-. ALASKA
RECEIVED
April 19, 2015 APR 19 2016
AOGCC
Ms. Cathy Foerster
Chair, Commissioner
Alaska Oil and Gas Conservation Commission
333 W. 7th Ave #100
Anchorage, AK 99501-3539
RE: Badami Field, Badami Pool Annual Reservoir Performance Report - 2015
Dear Ms. Foerster:
Savant Alaska LLC ("SALLC"), as operator of the Badami Unit, hereby submits the
attached Annual Reservoir Performance Report in accordance with the requirements of
Rule 9 of the Badami Oil Pool Area Injection Order, dated August 26, 1998 and 20
AAC.25.115. This report covers the period January I through December 31, 2015.
SALLC reserves the right to alter the content of the analyses contained in this report at
any time based upon the most recent surveillance information obtained.
Please contact David Kumar at 907-433-3822 if there are any other questions.
Sincerely
Dai umar
Pr uction Manager
vant Alaska LLC
cc: Bill Barron, DNR (via US Mail)
Teresa Imm/Pete Stokes, ASRC (via email)
Leland Tate, Glacier Oil and Gas (via email)
Dan Clark, Lead Field Operations Supervisor (via email)
Badami File
ANNUAL RESERVOIR SURVEILLANCE
REPORT
BADAMI OIL POOL
JANUARY 2015 - DECEMBER 2015
TABLE OF CONTENTS
A. Progress of Enhanced Recovery Project and Reservoir Maintenance Summary
B. Voidage Balance by Month of Produced Fluids and Injected Fluids
C. Analysis of Reservoir Pressure Surveys Within the Pool
D. Results of Analysis of Production and Injection Logs
E. Special Monitoring
F. Evaluation of Well Testing and Allocation
G. Future Development Plans
H. Review of Annual Plan of Operations and Development
I. Status of Wells Shut -In for 365 Days or More
A
Table 1
Table 2
Table 3
Table 4
Table 5
Figure 1
Figure 2
3
3
3
4
4
4
4
5
6
Badami Well Disposition
Badami Production/Injection — Surface Units
Badami Production/Injection Reservoir Units
Badami Pressure Monitoring Summaries
Badami Well Testing Frequency Summaries
Field Production History
Field Gas Disposition History
2
ANNUAL RESERVOIR SURVEILLANCE REPORT
BADAMI OIL POOL
January 2015 -December 2015
A. Progress of the Enhanced Recovery Project and Reservoir Management
Summary
Production was from 8 wells with gas injection into one well. Static pressure surveys
were obtained from wells 131-15, B1 -18A, B1-36 and 131-38. Table 4 contains a
summary of the static reservoir pressure readings acquired in 2015.
The total volume of oil produced from the Badami reservoir during the report period was
349,693 STBO. A total of 756,518 MSCF of gas was produced of which 3,427 MSCF
was injected back into the producing formation. No new wells were drilled and
completed during the reporting period; however new perforations were added to wells
131 -1 IA and 131 -3 6. A total of 172' of perforations were added to B 1-11 A and a total of
149' of perforations were added to 131-36. Well disposition is detailed in Table 1.
The oil production and gas disposition history of the field is shown in Figures 1 and 2.
B. Voidage Balance
Production and injection volumes and reservoir voidage by month are detailed in Tables
2 and 3. Cumulative voidage for 2015 was negative 774,184 reservoir barrels.
C. Reservoir Pressure Monitoring
Four pressure surveys were taken at Badami during the report period and are listed in
Table 4. These surveys show that the pressures in the individual lobes of the reservoir
continue to deplete over time consistent with the depletion drive recovery method
employed in the field.
3
D. Production Logging
No production logging was conducted during the report period.
E. Special Monitoring
No special monitoring was performed in 2015.
Downhole pressure monitoring was performed on 131-15, B 1-18A, BI -36 and BI -38 in
2015 as outlined in Table 4.
Monitoring of well integrity and surveillance activity on the Class I disposal well, B1-01,
was completed in 2015 and will continue pursuant to statutory requirement.
F. Evaluation of Well Testing and Allocation
Table 5 is a summary of well testing frequency for each of the Badami wells.
Daily oil production allocation to each well is accomplished by pro -rating the oil rates
from the most recent well test such that the total oil produced from all wells equals the
amount measured by the custody transfer pipeline meter.
G. Future Development Plans
On April 3, 2013, Savant Alaska LLC ("SALLC"), as Unit Operator, appealed a Decision
by the DNR to approve in part and deny in part an application to expand the Badami Unit
submitted on November 16, 2012. A Request for Stay was submitted to DNR on August
19, 2013. DNR has not responded to the appeal or request for stay to date.
SALLC is undertaking a detailed geologic study of the Badami Unit to locate
opportunities for continued development. SALLC intends to resume drilling within the
Badami Unit pending favorable results of the study, and an improvement of economic
conditions.
4
Monitoring of well integrity and surveillance activity on the Class I disposal well, B1-01,
will continue pursuant to statutory requirement.
Reservoir pressure data will be acquired during 2016 to monitor Badami reservoir
depletion.
H. Review of Plan of Development of Operations and Development
The 12th Plan of Development for the Badami Unit (POD) was approved by DNR for the
period of July 16th, 2015 through July 15th, 2016.
Proposed 12th POD activities include:
1. Complete a hydraulic fracture stimulation in one or both of the BI -18A and 131-
38
1-
38 wells.
2. Subject to favorable economic conditions, including increased oil prices, SALLC
may drill up to two high -angle Brookian Sands development wells to increase and
stabilize the production rate through the Badami plant and pipeline.
3. Complete major maintenance items, including smart pigging of the Badami oil
sales pipeline and slop oil and fire tank inspection and recoating.
5
I. Status of Well Shut-in for 365 Days or More (20 AAC 25.115)
The following wells were shut-in for all of 2015.
Badami Shut-in Wells 2015
Sw Name
Date Shut-in
Reason for Well
Shut-in (l)
Current Mechanical
Condition of Well 2
Future Utility Plans &
Possibilities 3
Comments
B1-25
July 2003
D. Mechanical
Collapsed tubing and casing at
D. Long term shut-in
Problem
4504' MD. Halliburton 9-5/8"
well/No immediate
Fasdrill @2450' MD w/ 50'
plans
Arctic Set Cement and 9-5/8"
Halliburton EZSV @ 2347'
MD w/ 50' of Arctic Set
Cement above plug.
(1) Reasons for Well Shut-in
A. High GOR, currently uncompetitive to produce due to facility constraints, no known
mechanical problems
B. High water, currently uneconomic to produce, no know mechanical problems
C. Low production rate, no known mechanical problems
D. Mechanical Problem
E. Other (Specify under comments)
(2) Current Mechanical Condition
Briefly describe the current mechanical condition including the condition of installed tubing and
casing strings.
(3) Future Utility
A. Evaluating remedial, sidetrack and/or re -drill opportunities
B. Remedial well work planned
C. Long term Shut-in well/No immediate plans
D. Suspended well
E. P&A planned
F. Other (Specify under comments)
A
Appendices
Table 1 Badami Well Disposition — As of December 31, 2015.
Completion
Well
Date
Disposition
Comment
B1-01
8/19/98
Class 1 Disposal Well
EPA mandated annual MIT -IA & AOGCC
mandated annual fill tag performed March 17,
2015. Both satisfied regulatory requirements.
Producer, cased. Originally pre-
Producer 8/24/98 to present. Holes punched
B1 -11A
3/04/98
produced injector. Hydraulic
for POGLM 11/4/98. Application for Sundry to
fracture treatment 08/17/98.
install k -valve was approved on 11/3/15 and received
188,000 lbs. of sand. Xylene &
from Cathy Foerster on 11/9/15
Diesel stimulation 1/25/2000, no
proppant used.
BI -14
5/01/98
Producer, cased with installed K-
Pull MCX valve and set K -Valve to convert well
Valve.
from a gas injection well to a producer under
Sundry 313-115 on 08/19/13.
131-1
7/31/98
Producer, tri -lateral, 8/24/98 to
Main borehole completed with slotted liner then
present.
additionally perforated 11/11/99. Two additional legs
have plop & drop slotted liners with open -hole tie-
backs to a junction window.
B1-16
6/13/98
Producer, ESP. Originally a pre-
Injector 8/24/98 to 9/25/98. Producer 9/26/98
produced injector, cased. J-2 and
to 10/21/98. Well worked over & ESP Installed
A-5 sands stimulated 09/17/98,
in March 2012. Dedicated producer from
proppant employed.
5/11/12 to present. "No -Flow" certified
08/16/2013
B1 -18A
3/12/10
Producer. Sidetracked unilateral
P&A to sidetrack under Sundry 309-366.
horizontal well. Dedicated producer
Sidetrack PTD No. 210-003. Horizontal section
from November 2010 to present.
completed with a slotted liner & external swell
packers. Tie -back with Baker FlexlockTM liner
hanger, ZXP packer and external casing packer.
BI -21
1/06/98
Injector, gas. Originally a pre-
Producer 8/24/98 to 09/28/99. Injector
produced gas injector, hydraulic
09/29/99 to August 2005. Producer October
stimulated, but no proppant
2005 through July 2013. Running tool Fish
employed. Now in service as a gas
recovered 3/8/12. Reconversion to injector service
injection well.
under Sundry 313-362 issued 7/27/13.
BI -25
11/20/98
Suspended Well. Unilateral, cased,
Tubing collapse confirmed 9/07/04. Well
completed with slotted liner.
suspended 4/08/05 by setting 2 CIBP in surface
casing at 2347 & 2450 feet MD with 50' Arctic
SetTM cement caps atop each.
B1-28
10/20/98
Producer, trilateral. Mother bore
Dedicated producer. Secured for TxIA
completed with a slotted liner. Two
communication 4/18/05. Repaired GLM and
additional legs have plop
passed MIT 10/08/12. Tubing & Liner plugs
and drop slotted liners with open
removed, then placed back on production
hole tie -backs.
6/21/2013.
B1-36
5/23/99
Producer, unilateral, cased. Now
Originally POP 5/30/99 and sustained through
perforated in and producing from
2 shut-in & re -start cycles. Variously produced from
Badami Sands.
Kekiktuk, Killian & Badami sands. Worked over
under Sundry 310-063 in March 2010. Put back on
continuous production 11/ 7/ 2010.
B1-38
2/09/10
Producer, Killian Formation;
Post drilling 10-3/4" casing leak repaired in
unilateral cased & perforated,
March 2010. Kekiktuk tested non-productive.
frac'd 7 Sept 2011, no proppant.
Dedicated Killian producer 11/16/10 to present.
Table 2 Badami Production/Injection - Surface Units
Table 2 Badami Production/Injection - Surface Units
BADAMI PRODUCTION / INJECTION - SURFACE UNITS
2015 PRODUCTION
Jan
Feb Mar April May June July Aug Sept Oct Nov
Dec
2015 Total
Oil (stb)
30,710
27,877 29,720 28,228 26,636 28,972 29,036 27,057 26,600 30,785 26,501
37,571
349,693
Associated Gas (mscf)
17,996
16,336 17,416 16,542 15,609 16,978 17,015 15,855 15,588 18,040 15,530
22,017
204,920
Free Gas (mscf)
34,829
32,947 32,351 32,612 53,188 34,221 40,330 38,559 61,201 63,896 63,264
64,198
551,598
Water (stb)
350
350 374 397 404 502 343 238 482 561 355
602
4,958
2015 INJECTION
Water (stb)
350
350 374 397 404 502 343 238 482 561 355
602
4,958
Gas (mscf)
406
465 336 732 1 28 39 787 1 64 549
20
3,427
Notes: (1) Per a discussion between Jack Hartz and Anna Dube on 322/00, a solution GOR of 586 was determined using product on data
from 8/98 to 2/99 and is used in cakWatirg volumes of associated gas. This was done to address the fact there are different
types of oil in the reservoir with different GOR.
(2) Volumes of produced water are based on tank levels in the slop tank. Water is injected into the B1-01 UIC Class 1 Disposal well.
F,
Table 3 Badami Production/Injection - Reservoir Units
BADAMI PRODUCTION / INJECTION - RESERVOIR UNITS
2015 PRODUCTION Jan Feb Mar April May June July Aug Sept Oct Nov Dec 2015 Total
Oil (rb) 39,923 36,240 38,636 36,696 34,627 37,664 37,747 35,174 34,580 40,021 34,451 48,842 454,601
Free Gas (rb) 20,305 19,208 18,861 19,013 31,009 19,951 23,512 22,480 35,680 37,251 36,883 37,428 321,582
Water (rb) 354 354 378 401 408 507 346 240 487 567 359 608 5,008
All Fluids (rb) 60,582 55,802 57,874 56,110 66,044 58,122 61,606 57,894 70,747 77,839 71,693 86,878 781,191
2015 INJECTION
Water (rb) 354 354 378 401 408 507 346 240 487 567 359 608 5,008
Gas (rb) 237 271 196 427 1 16 23 459 1 37 320 12 1,998
All Fluids (rb) 590 625 574 828 409 523 369 699 488 604 679 620 7,007
Voidage (rb) -59,992 -55,177 -57,301 -55,283 -65,635 -57,598 -61,237 -57,195 -70,259 -77,235 -71,014 -86,258 -774,184
Oil Formation Volume Factor, Bo 1.300 rb/stb
Gas Formation Volume Factor, Bg 0.00058 rb/scf
0.00328 vol/vol
Water Formation Volume Factor, Bw 1.0101 rb/stb
Notes: (1) Bo from Average of Badami #1 and Badami #5 (lower sand) PVT analysis.
(2) Bg calculation based on gas composition of sample taken 9/18/98 (reservoir temperature 165 degrees F, reservoir pressure. 6400 psi)
10
Table 4 2015 Badami Pressure Monitoring
Well
Test Date
Operation
Pressure at Datum
(sia)
Datum
(TVDSS Feet)
B1-38
5/17/2015
Pressure Build-up
2317
9608
B1 -18A
5/20/2015
Pressure Build-up
670
10030
BI -36
6/6/2015
Gas Lift Survey
938
8776
B1-15
6/26/2015
Gas Lift Survey
478
10362
11
Table 5 Badami Well Testing Frequency Summary
Number of well tests in each calendar year.
Well
2003
2004
2005
2006
2007
2008
2011
2012
2013
2014
2015
Bi -11A
11
0
20
84
33
0
89
36
32
17
20
B1-14
N/A
N/A
N/A
N/A
N/A
N/A
MNAN/A
N/A
N/A
N/A
13
12
B1-15
3
0
15
43
0
0
35
13
25
19
13
B1-16
0
0
0
1
1
0
1
28
39
15
19
B1-18
1
0
18
64
19
0
0
0
0
0
0
B1 -18A
N/A
N/A
N/A
N/A
N/A
12
118
33
34
17
15
B1-21
0
0
22
35
18
1
4
22
11
0
1
B1-25
8
0
0
0
0
0
0
0
0
0
0
B7-28
9
0
0
0
0
MNANO/A
0
0
3
33
18
16
B1-36
7
0
25
90
36
20
145
45
43
50
31
B1-38
N/A
N/A
N/A
N/A
N/A
22
102
49
34
22
9
12
Figure 1 Badami Field Production History
Badami Field Oil Production
18.000
16,000
14.000
12.000
v
n
B
m 10.000
E
8,000
_T
m
a
6.000
4.000
2.000
0 1 S ' R L
8198 8/89 8/00 8101 8102 8/03 8/04 8/05 8106 8/07 8108 8109 8110 8111 8112 8113 8/14 8115 8116 817
13
Figure 1 Badami Gas Disposition History
30.000
25.000
v 20.000
CL
U
N
E
N
d
E
15.000
N
R
0
a
O 10.000
5.000
Badami Field Gas Disposition
a,.
E�+Gax wn+oneel
0}a nw t�1.1wx naca bury +ti.r, n as }rias•. _ :WN
858 859 8.100 8101 8102 8/03 8104 8/05 8106 8107 8i08 8/09 8110 8.11 8/12 8/13 8114 815 8/16 8)17