HomeMy WebLinkAbout204-059 STATE OF ALASKA
- ALASKA 1PAND GAS CONSERVATION COMMISSO
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed: Abandon r Repair well r Rug Perforations r Stimulate [' Other X Sc - S
Alter Casing r Pull Tubing r Rirforate New Pool r Waiver r Time Extension r
Change Approved Program r Operat. Shutdow n r Perforate r Re -enter Suspended Well r
2. Operator Name: 4. Well Class Before Work: 5. Permit to Drill Number:
ConocoPhillips Alaska, Inc. Development 17 Exploratory
r _ .r 204 -059
3. Address: 6. API Number:
Stratigraphic r Service r
P. O. Box 100360, Anchorage, Alaska 99510 50- 103 - 20489 -00—° on
7. Property Designation (Lease Number): 8. Well Name and Number:
ADL 025559, 372095 . CD1 -08
9. Field /Pool(s):
Colville River Field / Alpine Oil Pool
10. Present Well Condition Summary:
Total Depth measured 15837 feet Plugs (measured) None
true vertical 6935 feet Junk (measured) None
Effective Depth measured 15837' feet Packer (measured) 11754
true vertical 6934' feet (true vertucal) 6709
Casing Length Size MD TVD Burst Collapse
CONDUCTOR 77 16 114 114
SURFACE 3372 9.625" 3408 2348
INTERMEDIATE 12480 7" 12515 6927
RECEIVED
Perforation depth: Measured depth: open hole 1251 3 2011
True Vertical Depth: 6927' -6935'
p1 t a Oil & Gss Ceps. G4mmisS1011
APCMaige
Tubing (size, grade, MD, and TVD) 3.5, L - 80, 11820 MD, 6740 TVD
Packers & SSSV (type, MD, and TVD) PACKER - BAKER SAB -3 PACKER W /MILLOUT EXTENSION @ 11754 MD and 6709 TVD
SAFETY VLV - CAMCO TRM -4E SCSSV @ 2299 MD and 1781 TVD
11. Stimulation or cement squeeze summary:
Intervals treated (measured): 12515'- 15837'
Treatment descriptions including volumes used and final pressure: open hole frac and HPBD
12. Representative Daily Average Production or Injection Data
Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation si
Subsequent to operation 281 1390 2930 -- 193
13. Attachments 14. Well Class after work:
Copies of Logs and Surveys run Exploratory r Development P.& r Stratigraphic r
15. Well Status after work: ,r Oil PT Gas r WDSPL r
Daily Report of Well Operations XXX GSTOR r WINJ T WAG r GINJ r SUSP r SPLUG r
16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
311 -044
Contact Tim Schneider Ca? 265 -6859
Printed Name Tim Schneider Title WNS Staff Production Engineer
Signature — f Phone: 265 -6859 Date
/ s67`
RBDMS MAY 0 3 Z 111K S 3 1( Submi Ori final OnI
Form 10 -404 Revised 10/2010 9 y
"OA
10 a CD1 -08
airlOCOPhiiiipS i t _ Well Attribul
1 Max Angle & MD TD
Aiesita1 inn W .Ilbore APIN WI I geld Naive Well Status Inc! ( °) MD (ftKB) Ad Bin (HKB)
,.... iiimp9< 501032048900 ,I PINE PROD 9301 15,60043 1583/0
• Comment H2S (ppm) Date Annotation End Date KB (ft) Rig Release Date
"' SSSV WRD 5 ( Last WO: 36.10 5/14/2004
Well Cony, , 14)8 . 415/2011 2'.08 "2 PM - - -- - - -
L - Act
Annotation De pth (ftKB) End Date Annotation 'last Mod ... End Date
Last Tag ] - I Rev Reason: OPEN HOLE FRAC 1 Imosbor 4/5/2011
Casing Strings -
Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (ND) ... String Wt... String ... String Top Thrd
CONDUCTOR 15.062 37.0 114.0 114.0 62.50 H - 40 WELDED _
HANGER, 32 r s Casing Description String 0... String ID ... Top (ftKB) Set Depth ( /... Set Depth (TVD) String Wt... String ... String Top Thrd L.
..:,- SURFACE 95/8 8.921 36.5 3,408.4 2,343.0 36.00 J - 55 BTC
Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (ND) Siring Wt... String ... String Top Thrd
INTERMEDIATE 7 6.151 34.7 12,515.1 6,926.6 26.00 L BTCM
P Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (ND) String Wt... String String Top Thrd
.. HOLE 61/8 6 -125 12,515.0 15,837.0 6,935.0
Tubing Strings
�l Tubing Description String 0. -. String ID ... Top (ftKB) Set Depth (f... Set Depth (ND) ... String Wt.. !String ... String Top Thrd
Icil I 1 TUBING 4 5'x3 5 3 1/2 2 - 992 I 32.1 11,820.7 6,740.0 9.30 I L EUEMOD Completion Details
Top Depth
(ND) Top Intl Nomi...
Top MKS) (9") () Item Description Comment ID0n)
32.1 32.1 0.35 HANGER FMC TUBING HANGER 4.500
` 96.7 96] 0.42 X0 CROSSOVER 4.5 "x3.5" 3.500
2,298.7 1,781.4 59.52 SAFETY VLV CAMCO TRM-4E SCSSV 2.812
CONDUCTOR, 11 6,663.2 57.96 SLEEVE -C BAKER CMPA SLIDING SLEEVE w/2.81" 'X' PROFILE (CLOSED 2.812
37 - 110 5/20/2004)
-! 11,754.4 6,708.7 60.71 PACKER BAKER SAB -3 PACKER w /MILLOUT EXTENSION 3.875
ISOSLEEVE.
- .-- _-.-._ ..,.
2,299N 11,808.5 6734.2 62.43 NIPPLE 2.750
SAFETYIAN, 2,,289 239 11,8202 6,73518 62 80 WLEG BAKER WIRELINE ENTRY GUIDE 3.000
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
' Top Depth 1
( Top Inc!
To KB ( ftKB) r) Description Comment Run Date ID (in)
! 2, 298.7 1,781 4 59.52 ISO SLEEVE 2 81 • ISOLATION SLEEVE SET IN SAFETY VLV. 3/21/2011 2.300
Stimulations & Treatments
Bottom
Min Top Max Bbn Top Depth Depth
Depth Depth (TVD) (ND)
SURFACE, -------.A (ftKB) (ftKB) (ft18) (8103) Type Date Comment
36 12,515.0 15,837.0 6,926.6 6,935.0 OPEN HOLE 4/4/2011 OPEN HOLE CSAND FRAC - Pumped 406,382# of
FRAC 16/20 Carolite (102% design), and 25# crosslink gel
( 20 bpm (total job volume 3511 bbls)
12,515.0 15,837.0 6,926.6 6,935.0 HPBD 3/30/2011 Injected 500 bbl slick seawater at 8 -10 bpm at
GAS LIFT, .. 3000 -3800 psi. Freeze protected well with 30 -bbl
5. - .,.,h dead crude.
Notes: General& Safety
' End Date Annotation
r 5/12/2004 NOTE: TREE: FMC 4 -1/16 5K - TREE CAP CONNECTION: 7" OTIS
-a 9/7/2010 NOTE: VIEW SCHEMATIC w /Alaska Schematic9.0
GAS LIFT. .. :A
8
I
C
GAS LIFT,
11,580
I
SLEEVE -C
11,668
- I ,
)
PACKER, ,_ - „_
11,754
NIPPLE, 11,808- A
Mandrel Details
Top Depth Top - -- -._ Port I
(ND) Inc! OD Valve Latch Size ITRO Run
WLEG, 11,820 Stn Top(ftKB) (ftKB) (°) Make Model_ )in) Seri Type Type (in) (psi) Run Date Cwn.._
1 5,403.9 3,411.4 61.51 CAMCO KBUG 1 GAS LIFT DMY BK -5 0.000 0.0 5/12/2004
2 9,797.9 5,685.9 58.11 CAMCO KBUG 1 GAS LIFT DMY BK -5 0.000 0.0 3/20/2011
i i 3 11,580.5 6,620 .0 58.67 CAMCO KBUG 1 GAS LIFT DMY BK -5 0.000 0.0 3/21/2011
TD, 12,515
NTERMEDIATE,
35- 12,515
liPliD, 12,515
OPEN HOLE
FRAC, 12,515
OPEN HOLE,
12,515 - 18,837
CD1 -08 Well Work Summary
DATE. SUMMARY •
2/8/11 ATTEMPTED TO BRUSH & FLUSH TBG. UNABLE TO PUMP INTO TBG DUE TO HIGH
PSI. IN PROGRESS.
2/9/11 RAN BAILER TO 3967' SLM. UNABLE TO PASS. SAMPLE OBTAINED. JOB
SUSPENDED.
2/13/11 JET THROUGH ICE PLUG AT 3995 CTMD, CLEANED TUBING /CASING TO 12550 CTMD
TAKING RTNS TO SURFACE, UNABLE TO ENTER OPEN HOLE, WELL IS FREEZE
PROTECTED.
3/19/11 BRUSHED & FLUSHED TBG, GLM's & XN NIPPLE @ 11808' RKB WHILE LRS PUMPED
100 BBLS HOT SEAWATER. JOB SUSPENDED, AVAILABILITY OF FLUID TRANSPORT.
IN PROGRESS
3/20/11 SET 2.81 CAT SV @ 11808' RKB. PULLED OV @ 11580' RKB & GLV @ 9797' RKB. SET
DMY VLV @ 9797' RKB. LRS LOAD TBG /IA W/ 276 BBLS INHIBITED SEAWATER & 130
BBLS CRUDE, U -TUBE FOR FREEZE PROTECT. IN PROGRESS
3/21/11 SET DV @ 11580' RKB. MIT -T PASSED. MIT -IA PASSED. PULLED 2.81 CAT SV @
11808' RKB. SET ISO SLEEVE @ 2298' RKB. COMPLETE
3/30/11 Injected 500 -bbl slick seawater at 8 -10 bpm at 3000 -3800 psi. Freeze protected well with 30-
bbl dead crude. Began spotting equipment for proposed frac. (See attached pump report
and acquisition files for time log and detailed pump data)
4/4/11 Performed Alain- -C -sand frac •um•in• 406 382# of 1. 0 Whit- S. • 1 0 • - ! -go
25# crosslink gel at 20 bpm (total job volume 3511 -bbl). Pumped six stages (with an
extended 4 -ppa stage; highest stage of 7 -ppa proppant) and flushed with 92 -bbl 25#
crosslink gel, 92 -bbl 25# linear gel, and 35 -bbl diesel. Rigged down frac equipment and
turned freeze- protected well back to DSO to put on production.
4/5/11 PULLED FRAC SLV @ 2299' RKB. SET CATCHER @ 11,809' RKB. PULLED DV @
11,581' RKB. UNSUCCESSFUL ATTEMPT TO SET OV @ 11,581' RKB. IN PROGRESS.
4/6/11 SET OV (ORIFICE=.25") @ 11,581' RKB. PULLED CATCHER @ 11,809' RKB. SET
FRAC SLEEVE @ 2299' RKB. READY FOR EXPRO.
4/18/11 TBG OPEN TO 2.86" TO 2298' RKB. PULLED 2.81" ISO SLEEVE @ 2298' RKB.
COMPLETE
4/19/11 Scale squeeze pumped 4/19/2011; initial TBG /IA/OA, 250/475/775 psi; facility pumped 50
bbl pre -flush with injection water; LRS pumped 72 gallons WAW5206 at 0.4 bpm while
facility pumped 15 bbls injection water at 4 bpm, 350/400/700; LRS pumped 715 gallons
SCW4004 at 0.7 bpm while facility pumped 97 bbls injection water at 4.5 bpm, 447/450/700;
facility pumped 1153 bbl over - displacement with injection water; well shut in for 12 hours and
returned to service.
• •
sun raj ARLEK(A
SEAN PARNELL, GOVERNOR
ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100
CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539
PHONE (907) 279 -1433
FAX (907) 276 -7542
Tim Schneider
WNS Staff Production Engineer
ConocoPhillips Alaska, Inc.
P.O. Box 100360
Anchorage, AK 99510 44 F 3 25 2011 Q 5
Re: Colville River Field, Alpine Oil Pool, CD 1 -08
Sundry Number: 311 -044
Dear Mr. Schneider:
Enclosed is the approved Application for Sundry Approval relating to the above
referenced well. Please note the conditions of approval set out in the enclosed
form.
As provided in AS 31.05.080, within 20 days after w notice of this
decision, or such further time as the Commission grants for good cause shown,
a person affected by it may file with the Commission an application for
reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the
next working day if the 23rd day falls on a holiday or weekend.
Sincerely,
/1
Daniel T. Seamount, Jr.
Chair
DATED this 2- day of February, 2011.
Encl.
STATE OF ALASKA � l / (i
ALAS•IL AND GAS CONSERVATION COMMISS• � t ii, S
APPLICATION FOR SUNDRY APPROVALS ti'
20 AAC 25.280
1. Type of Request: Abandon f Rug for Redrill r Perforate New Pool r Repair w ell fl Change Approved Program r
Suspend fl Rug Perforations fl Perforate r Rill Tubing r Time Extension `"
Operational Shutdow n r Re -enter Susp. Well fl Stimulate FoT . Alter casing r Other:
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
ConocoPhillips Alaska, Inc. Development r . Exploratory f 204 - 059 -
3. Address: 6. API Number:
Stratigraphic r Service r
P. O. Box 100360, Anchorage, Alaska 99510 50- 103- 20489 -00 •
7. If perforating, closest approach in pool(s) opened by this operation to nearest property line 8. Well Name and Number:
where ownership or landownership changes:
Spacing Exception Required? Yes r No F.` CD1 -08 •
9. Property Designation (Lease Number): 10. Field / Pool(s):
ADL 025559, 372095 . Colville River Field / Alpine Oil Pool •
11. PRESENT WELL CONDITION SUMMARY
Total depth MD (ft): Total Depth TVD (ft): Effective Depth Mo (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
15837 . 6935 - 15837' 6934'
Casing Length Size MD TVD Burst Collapse
CONDUCTOR 77 16 114' 114'
SURFACE 3372 9.625" 3408' 2348'
INTERMEDIATE 12480 7" 12515' 6927'
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
open hole 12515'- 15837' 6927' -6935' 3.5 L - 11820
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft)
PACKER - BAKER SAB -3 PACKER W /MILLOUT EXTENSION MD= 11754 TVD= 6709
SAFETY VLV - CAMCO TRM -4E SCSSV MD= 2299 TVD= 1781
12. Attachments: Description Summary of Proposal p 13. Well Class after proposed work:
Detailed Operations Program r BOP Sketch r Exploratory Development Service r
14. Estimated Date for Commencing Operations: 15. Well Status after proposed work:
2/28/2011 Oil 17 . Gas r WDSPL fl Suspended
16. Verbal Approval: Date: WINJ ( — GINJ r WAG r Abandoned r
Commission Representative: GSTOR r SPLUG
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Tim Schneider @ 265 - 6859
Printed Name Tim Sch ider Title: WNS Staff Production Engineer
Signature ��Jl Phone: 265 Date Z' 21
'
Commission Use Only
Sundry Number. I 1 — 04 ti
Conditions of approval: Notify Commission so that a representative may witness
IV
Plug Integrity r BOP Test r Mechanical Integrity Test I"'` Location Clearance
=ER 2 2 200
Other:
Masks 017 81 Gas Cons, c omm i ss i on
Subsequent Form Required: /0 ` LII O L !Anatomise
gn
APPROVED BY 7 /) //
A roved by: / COMMISSIONER THE COMMISSION Data: / CS l C
PP Y / /
R � � aFE6 2 5 Z01 �� � �`� ` l� _cp 2 '' � , l r
Form 10-403
R 1G1NAL Submit . Duplicate
14,
WNS ill CD1 -08
r- e Co M 5: ` '; eg b r 0 [ ALPINE Name W Me O [MD
il{7:S) B) Act Btrn (ftKB)
Ca.
5.837.0
-- _ - . - Comment 'IH25 (ppm) ',Date [Annotation [End Date KB (ft) Rig Release Dahl
SSSV: WRDP � [Last WO. I 36.10 5/14/2004
.,. Y1,S 1 58,:.D1$8. 1 1f?5203Q _ _ _ _ -. - -
Annotation [Depth ftKB End Date Annotation Last Mod ... E d Date
Ap4aL I pt ( I 1
Last Tag: Rev Reason: FORMAT UPDATE 9.0_ Imosbor 9q/2010
rasing Strings
Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (TVD) ... [ 'String Wt... String ... String Top Thrd
- - -- CONDUCTOR 16 15062 37.0 114 -0 114.0 62.50 H-40 WELDED
_..
WINGER, 32 ...1 � (me Casing Des0crnt iption String 0... String ID ._ Top (ftKB) Set Depth (f... Sat Depth (ND) ... String Wt... String ... String Top Thrd
�:; - - SURFACE 9 5/8 8.921 36.5 3,408.4 2,343.0 36.00 J - 55 BTC
Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (TVD) ... String Wt... String ... String Top Thrd
7. INTERMEDIATE 7 6 151 34.7 12,515.1 6,926.6 26.00 L BTCM
f,, . _. Casing Description String 0... String ID ... Top (ftKB) Set Depth (f.. Set Depth (TVD) ... String Wt... String : String Top Thrd
OPEN HOLE 6 1/8 6 125 12,515 0 15,837 0 6,935.0
am
Tubing Strings
Description I String 0 String ID ._ Top (816/3) Set Depth (L.. Set Depth (TVD) .. String Wt... String I String Top Thrd IP I UBING 4 5x3.5' 3 1/2 2.992 32 - 11,820 7 6,740 0 9 30 , L I EUEMOD
i . Tolong
Com ple tion Details
T p Depth
(TVD) Top Inc! N oo i...
: .
Top (ftKB) (RKB) ('1 Item Description Comment ID (in)
32.1 32.1 0.35 HANGER FMC TUBING HANGER 4.500
96.7 96.7 0.42 XO CROSSOVER 4.5"x3.5" 3.500
2,298.7 1,781.4 59.52 SAFETY V W CAMC
11,667.9 6,663.2 57.96 SLEEVE
11,754.4 6,708.7 60.71 PACKER
11,808.5 6,734.2 62.43 NIPPLE
O TRM-4E SCSSV 2.812
CONDUCT BAKER CMPA SLIDING SLEEVE w/2.81" 'X' PROFILE (CLOSED 2.812
37 - 1
5/20/2004)
BAKER SAB -3 PACKER w /MILLOUT EXTENSION 3.875
2.750
SAFETY VLV, _. - _...
Y298 11,820.2 6,739.8 62 80 WLEG BAKER WIRELINE ENTRY GUIDE 3.000
Notes: General & Safety
End Date Annotation
5/12/2004 NOTE: TREE: FMC 4 -1/16 5K - TREE CAP CONNECTION: T OTIS
I I� 9/7/2010 NOTE VIEW SCHEMATIC w /Alaska Schematic9.0
SURFACE, __ L
36 -3,408
GAS LIFT,
5,404 I
GAS LIFT,
9,798
I
it
GAS LIFT,
11,580
H i
t
SLEEVE._______._
11,668
air
11,754
I
NIPPLE, 11,808 - -- - - - -'-.+ - -
Mandrel Details
Top Depth T p I Port
„ ,._ (TVD) Incl OD Valve Latch Size TRO Run
WLEG, 11,820 - -. _ Stn TopjW(B) - -(R(B) ('I Make Model (le) Sery Type TYpe ( (ps!) Run Date Com...
1 5,403.9 3,411.4 61.51 CAMCO KBUG 1 GAS LIFT DMY BK -5 0.000 0.0 5/12/2004
2 9,797.9 5,685 9 58.11 CAMCO KBUG 1 GAS LIFT GLV BK -5 0.188 1,830.0 2/13/2008
3 11,580.5 6,620.0 58.67 CAMCO KBUG 1 GAS LIFT OV BK -5 0.250 0.0 2/13/2008
TD, 12,515
NTERMEDIATE,
35. 12,515
OPEN HOLE,
12,515 - 15,837
• •
Overview:
CD1 -08: A high pressure breakdown will be performed to confirm injectivity into the open hole
horizontal interval. Upon confirmation, plans will be made to perform A hydraulic fracture
treatment. This well is currently SI due to production assurance issues due to low flowrate. The
frac stimulation will increase flow significantly allowing continued production. A coil cleanout will
only be performed should it be necessary post -frac.
Break down Procedure:
1) RU a hot oiler and transport full of seawater ( -110 bbls).
2) Test equipment to 5500 psi.
3) Ramp rate up from 0.25 —1.5 bpm in 0.25 bpm increments pumping 2 bbls at each rate.
Continue ramping up the rate to 5 bpm in increments of 0.5 bpm pumping 5 bbls at each rate. Y'
Record pressure data frequently.
Frac Procedure
1) MIRU eleven clean insulated frac tanks with a berm surrounding the tanks that holds the tank
volume plus 10 %. Load tanks with seawater from the injection system (approximately 5500 ---
bbls are required for the treatment)
2) Rig up Schlumberger equipment and stab Tree Saver. (Test tree saver seals to expected
pressure using warm diesel to assure seal integrity in tubing hanger).
3) Pressure test surface lines to 9500 psi
4) Pump the 250 bbl Breakdown with Schlumberger's YF125ST fluid system. Bring pumps up •
to maximum rate ASAP.
5) Pump the following schedule at 20 -25 BPM with a maximum pressure of 9000 psi, add
breaker as per lab results. Maintain 3000 psi on the IA during the treatment.
a) 1000 bbls YF125ST Pad
b) 500 bbls YF125ST w/ 2 ppa 16/30 White Sand
c) 1200 bbls YF125ST w/ 4 ppa 16/30 White Sand
d) 600 bbls YF125ST w/6 ppa 16/30 While
e) 600 bbls YF125ST w/ 7 ppa 16/30 White Sand
f) F - • linear fluid and freeze protect
al Sand: —450,000 lbs.
6) Monitor the su ace pressure fall -off at the end of the job for 30 min (or until closure is
verified) if the well does not screen out.
7) Rig down equipment, (and prep for next well frac after evaluation by Engineering) move off
location.
FCO if required with slick diesel.
• ~
-.,o„_
4=~ -g
„~
~.r.
~ <
MICROFILMED
03/01 /2008
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs_Inserts\Microfilm_Marker.doc
.
.
~
ConocoPhillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
81
March 31, 2007
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501 SCANNED APR 0 9 2007
aö4----o5Q
Dear Mr. Maunder:
Enclosed please find a spreadsheet with a list of wells ITom the Alpine field (ALP). Some of
these wells were found to have a void in the conductor by surface casing annulus. The voids that
were greater than 3 feet were first filled with cement to a level of approx. 1.0 foot. The
remaining volume of annular void subsequently was filled with a corrosion inhibiter engineered
to prevent water ITom entering the annular space. As per previous agreement with the AOGCC,
this letter and spreadsheet serves as notification that the treatments took place and meets the
requirements of form 10-404, Report of Sundry Operations.
Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions.
Sincerely,
~~C
Jerry Dethlefs
ConocoPhillips Well Integrity Proj Supervisor
Attachment
.
.
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Alpine Field
March 31,2007
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD# cement pumped cement date inhibitor sealant date
ft bbls ft gal
CD1-1 199-046 26" 0.3 6" 4/16/2003 3 2/17/2007
CD1-2 200-172 54" 0.6 5" 4/16/2003 2.7 2/17/2007
CD1-3 199-120 9'2" 1.4 14" 4/16/2003 6.5 2/17/2007
CD1-4 200-117 84" 1.0 9" 4/16/2003 4.3 2/17/2007
CD1-5 199-128 56" 0.6 30" 4/16/2003 14 2/17/2007
CD1-6 200-083 4" na 4" na 2 2/17/2007
CD1-8 204-059 6" na 6" na 8 2/17/2007
CD1-9 200-071 6" na 6" na 3 2/16/2007
CD1-10 200-171 18" na 18" na 8.5 2/16/2007
CD1-12 204-205 4" na 4" na 2 3/8/2007
CD1-14 201-038 4" na 4" na 1 3/8/2007
CD1-16 199-094 14'7" 2.0 6" 4/16/2003 3 2/16/2007
CD1-17 200-145 8'9" 1.2 8" 4/16/2003 3.5 2/16/2007
CD1-18 204-206 4" na 4" na 1 3/8/2007
CD1-19 200-040 10" na 10" na 3 3/8/2007
CD1-20 204-240 6" na 6" na 2 3/8/2007
CD1-21 201-006 14' 1.8 8" 4/16/2003 3.7 2/16/2007
CD1-22 200-110 25" 0.3 4" 4/16/2003 1 3/8/2007
CD1-23 199-063 15' 2.1 8" 4/16/2003 3.7 2/16/2007
CD1-24 199-026 27" 0.3 6" 4/16/2003 2.8 2/16/2007
CD1-25 200-008 76" 0.8 18" 4/16/2003 8.4 2/16/2007
CD1-26 199-088 6" na 6" na 3 2/19/2007
CD1-27 200-006 16'8" 2.6 4" 4/16/2003 1.8 2/16/2007
CD1-28 200-199 6" na 6" na 3 2/16/2007
CD1-29 200-215 4" na 4" na 1.8 2/16/2007
CD1-30 200-132 9' 1.4 6" 4/16/2003 3 2/16/2007
CD1-31 200-118 6" na 6" na 3 2/19/2007
CD1-32 199-104 8'6" 1.2 5" 4/16/2003 2.3 2/16/2007
CD1-33 200-212 54" 0.6 10" 4/16/2003 4.7 2/16/2007
CD1-34 200-043 38' 5.7 8" 4/16/2003 3.7 2/16/2007
CD1-35 199-038 4" na 4" na 1 3/8/2007
CD1-36 199-112 15'10 2.3 8" 4/16/2003 3.7 2/16/2007
CD1-37 199-067 8" na 8" na 4 2/19/2007
CD1-38 200-003 48" 0.5 4" 4/16/2003 1.5 3/8/2007
CD1-39 199-080 4" na 4" na 1 3/8/2007
CD1-40 199-044 4" na 4" na 1.8 2/16/2007
CD1-41 200-017 12" na 12" na 5.6 2/16/2007
CD1-42 199-119 74" 0.8 6" 4/16/2003 2.8 2/16/2007
CD1-43 200-106 8" na 8" na 3.7 2/16/2007
CD1-44 200-055 10" na 10" na 4.7 2/16/2007
CD1-45 199-101 4" na 4" na 2 2/19/2007
CD1-46 204-024 36" na 36" na 16.9 2116/2007
.
.
"VELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West 7th A venue, Suite 100
Anchorage, Alaska 99501
November 15, 2006
RE: MWD Formation Evaluation Logs: CDI-07_PB2, CDI-08, CD1-11, CDI-12_Ll.
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518
CDI-07 PB2: ()::r:~ ~0"3-9dS 11 lLI¿'!D~
Digital Log Images:
50-103-20478-00,71
1 CD Rom
CDI-08: 96L[-0S''1 i114LItf-1
Digital Log Images:
50-103-20489-00
CDl-l1: UI(!. ;;)0'--{-1750 it 144D3
Digital Log Images:
50-103-20500-00
SCANNED FEB 0 1 2007
1 CD Rom
1 CD Rom
CDI-12 Ll:
Digital Log Images:
50-103-20501-00, 60
1 CD Rom
JrY-I.. göS-
-1t JLfi./D<O
9-o<'¡-'d34
1 LfL/Ó"?-
G
) ') J ~ ;(.t)\':) ~
DATA SUBMITTAL COMPLIANCE REPORT
5/25/2006
Permit to Drill 2040590
Well Name/No. COLVILLE RIV UNIT CD1-08
Operator CONOCOPHILLlPS ALASKA INC
S~J..
API No. 50-103-20489-00-00
MD
Completion Date 5/13/2004
Completion Status 1-01L
15837
TVD 6934
~---
-------~
Current Status 1-01L
UIC N
REQUIRED INFORMATION
Mud Log No
Samples No
DATA INFORMATION
Types Electric or Other Logs Run: GR, RES, DEN, NEU
Well Log Information:
Log/ Electr
Data Digital Dataset Log Log Run
T'jJ>é Med/Frmt Number Name Scale Media No
iED 0 Asc Directional Survey
I
i:: Directional Survey
0 Asc Directional Survey
I~ Directional Survey
¥ 0 Lis 12585 Gamma Ray
~LiS 12585 LIS Verification
!~LiS 13745 Induction/Resistivity
Well Cores/Samples Information:
Interval
Name Start Stop Sent Received
ADDITIONAL INFORMATION
y~
Chips Received? ~
~
Well Cored?
Daily History Received?
Formation Tops
Analysis
Received?
(data taken from Logs Portion of Master Well Data Maint
Interval OH/ '-.,,/
Start Stop CH Received Comments
6/9/2004 MWD
0 0 6/9/2004 MWD
0 0 6/9/2004 IIFR
0 0 6/9/2004 IIFR
3404 15770 Open 6/9/2004 GRlEWR4/ROP/PWD
3404 15770 Open 6/9/2004 GRlEWR4/ROP/PWD
114 15837 Open 2/22/2006 ROP DGR EWR plus
Graphics
Sample
Set
Number Comments
~
~
@N
Comments:
Compliance Reviewed By:
~
Date:
1'1
~~~
DATA SUBMITTAL COMPLIANCE REPORT
5/25/2006
Permit to Drill 2040590
Well Name/No. COLVILLE RIV UNIT CD1-08
Operator CONOCOPHILLlPS ALASKA INC
MD 15837
Completion Date 5/13/2004
Current Status 1-01L
Completion Status 1-01L
TVD 6934
API No. 50-103-20489-00-00
UIC N
'~
'~
)
)
WELL LOG TRANSMITTAL
JD4- LJSC)
To: State of Alaska
Alaska Oil and Gas Conservation Corom.
Attn.: Librarian
333 West ih Ave., Suite 100
Anchorage, Alaska 99501
February 16, 2006
t"3l +~~
RE: MWD Formation Evaluation Logs CD1-08,
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500
CDt-08:
LAS Data & Digital Log Images:
50-103-20489-00
1 CD Rom
é1íDh
.Þj~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF ANNULAR DISPOSAL
..
1. Operator: 4a. Well Class: Stratigraphic D Service D 6. Permit to Drill Number: 204-059
ConocoPhillips Alaska, Inc. Development 0 Exploratory D 7. Well Name: CD1-08
2. Address: 4b. Well Status: Oil 0 Gas D WAGD 8. API Number:
P. O. Box 100360, Anchorage, Alaska GINJ D WINJ D WDSPL D 50-103-20489-00
3. (Check one box only) 5a. Sundry number: 5b. Sundry approval date: 9. Field:
Initial Disposal D or Continuation D or Final 0 304-382 11/1/2004 Colville River Field
10. (h)(1) drilling mud, drilling (h)(2) drill rig wash (h)(3) Other Commission Volume (bbls): Number of Disposal Disposal Source Wells:
cuttings, reserve pit fluids fluids and drill rig approved substances (include days Beginning Dates: Ending Dates:
cement-contaminated domestic waste water descriptions in block 12) disposal
drilling mud, completion occurred '._-","
fluids, formation fluids and
any necessary water
added
Previous 409* 409
totals (bbls):
2004 / 4th 0 0 0 0
2005/1st 0 0 0 0
2005 / 2nd 0 0 0 0
2005 / 3rd 0 0 0 0
Total Ending Report is due on the 20th --
Volume 0 0 409 409 0
(bbls): of the month following the final month of the quarter. Ex:
April 20 for the first quarter, July 20 for the second quarter,
11. Attach: Disposal Performance Data: Pressure vs. Time D Step Rate Test D October 20 for the third quarter, and January 20 for the
Other (Explain) D fourth quarter.
12. Remarks and Approved Substances
Description(s): * Freeze protect volumes and injectivity test
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~ ~-------- Date: \. 1'C-Z-(06
Printed Name: Randy Thomas Title: Kuparuk Drilling Team Leader Phone Number: (907) 265-6830
Form 10-423 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF ANNULAR DISPOSAL
1. Operator: 4a. Well Class: Stratigraphic D Service D 6. Permit to Drill Number: 204-059
ConocoPhillips Alaska, Inc. Development 0 Exploratory D 7. Well Name: CD1-08
2. Address: 4b. Well Status: Oil 0 Gas D WAGD 8. API Number:
P. O. Box 100360, Anchorage, Alaska GINJ D WINJ D WDSPL D 50-103-20489-00
3. (Check one box only) 5a. Sundry number: 5b. Sundry approval date: 9. Field:
Initial Disposal D or Continuation 0 or Final D 304-382 11/1/2004 Colville River Field
10. (h)(1) drilling mud, drilling (h)(2) drill rig wash (h)(3) Other Commission Volume (bbls): Number of Disposal Disposal Source Wells:
cuttings, reserve pit fluids fluids and drill rig approved substances (include days Beginning Dates: Ending Dates:
cement-contaminated domestic waste water descriptions in block 12) disposal
drilling mud, completion occurred --
fluids, formation fluids and
any necessary water
added
Previous 409* 409
totals (bbls):
2004 / 4th 0 0 0 0
2005/1st 0 0 0 0
2005 / 2nd 0 0 0 0
2005 / 3rd 0 0 0 0
'-- -
Total Ending Report is due on the 20th
Volume 0 0 409 409 0
(bbls): of the month following the final month of the quarter. Ex:
April 20 for the first quarter, July 20 for the second quarter,
11. Attach: Disposal Performance Data: Pressure vs. Time D Step Rate Test D October 20 for the third quarter, and January 20 for the
Other (Explain) D fourth quarter.
12. Remarks and Approved Substances
Description(s): * Freeze protect volumes and injectivity test
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~~~ -- Date: \.b(?-o (-0 ')
Printed Name: Randy Thomas Title: Kuparuk Drilling Team Leader Phone Number: (907) 265-6830
Form 10-423 Rev. 2/2004
RBDMS BFL 0 C1 2 1 Z005
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF ANNULAR DISPOSAL
1. Operator: 4a. Well Class: Stratigraphic D Service D 6. Permit to Drill Number: 204-059
ConocoPhillips Alaska, Inc. Development 0 Exploratory D 7. Well Name: CD1-08
2. Address: 4b. Well Status: Oil 0 Gas D WAGD 8. API Number:
P. O. Box 100360, Anchorage, Alaska GINJ D WINJ D WDSPL D 50-103-20489-00
3. (Check one box only) 5a. Sundry number: 5b. Sundry approval date: 9. Field:
Initial Disposal D or Continuation 0 or Final D 304-382 11/1/2004 Colville River Field
10. (h)(1) drilling mud, drilling (h)(2) drill rig wash (h)(3) Other Commission Volume (bbls): Number of Disposal Disposal Source Wells:
cuttings, reserve pit fluids fluids and drill rig approved substances (include days Beginning Dates: Ending Dates:
cement-contaminated domestic waste water descriptions in block 12) disposal
drilling mud, completion occurred '-=""
fluids, formation fluids and
any necessary water
added
Previous 409* 409
totals (bbls):
2004 / 4th 0 0 0 0
2005 /1 st 0 0 0 0
2005 / 2nd 0 0 0 0
2005 / 3rd
Total Ending Report is due on the 20th --/
Volume 0 0 409 409 0
(bbls): of the month following the final month of the quarter. Ex:
April 20 for the first quarter, July 20 for the second quarter,
11. Attach: Disposal Performance Data: Pressure vs. Time D Step Rate Test D October 20 for the third quarter, and January 20 for the
Other (Explain) D fourth quarter.
12. Remarks and Approved Substances
Description(s): * Freeze protect volumes and injectivity test
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~~~ \-'-~ Date: ìlil_(o~
\
Printed Name: Randy Thomas Title: Kuparuk Drilling Team Leader Phone Number: (907) 265-6830
Form 10-423 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF ANNULAR DISPOSAL
1. Operator: 4a. Well Class: Stratigraphic 0 Service 0 6. Permit to Drill Number: 204-059
ConocoPhillips Alaska, Inc. Development 0 Exploratory 0 7. Well Name: CD1-08
2. Address: 4b. Well Status: Oil 0 Gas 0 WAG 0 8. API Number:
P. O. Box 100360, Anchorage, Alaska GINJ 0 WINJ 0 WDSPL 0 50-103-20489-00
3. (Check one box only) 5a. Sundry number: 5b. Sundry approval date: 9. Field:
Initial Disposal 0 or Continuation 0 or Final 0 304-382 11/1/2004 Colville River Field
10. (h)(1) drilling mud, drilling (h)(2) drill rig wash (h)(3) Other Commission Volume (bbls): Number of Disposal Disposal Source Wells: -,-
cuttings, reserve pit fluids fluids and drill rig approved substances (include days Beginning Dates: Ending Dates:
cement-contaminated domestic waste water descriptions in block 12) disposal ~'
drilling mud, completion occurred
fluids, formation fluids and
any necessary water
added
Previous 409* 409
totals (bbls):
2004 / 4th 0 0 0 0
2005/1st
2005 / 2nd
2005 / 3rd
~.
Total Ending Report is due on the 20th
Volume 0 0 409 409 0
(bbls): of the month following the final month of the quarter. Ex:
April 20 for the first quarter, July 20 for the second quarter,
11. Attach: Disposal Performance Data: Pressure vs. Time 0 Step Rate Test 0 October 20 for the third quarter, and January 20 for the
Other (Explain) 0 fourth quarter.
12. Remarks and Approved Substances
Description(s): * Freeze protect volumes and injectivity test
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~....._~,~ Date: t (., /o~'
Printed Name: Randy Thomas Title: Kuparuk Drilling Team Leader Phone Number: (907) 265-6830
Form 10-423 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Dllnlir.~tA
ALl,
'S~ \V 0 k
A1'fNULAR DI~::~;~~8~PPLlCA'ì10N OC:115 2QM ~ /~O{~
~ . -~s~c~ ~
3. Permit to Drill No: 204-0590,\ ð.. ~~.....~ C.cms. \Jon\" \
Maska h Ct w"''''. . ..~
50- -1-03_20489_00~\\~r¡cr~~e
4. API Number:
STATE OF ALASKA
A OIL AND GAS CONSERVATION COW
1. Operator Name:
ConocoPhillips Alaska
2. Address:
700 G Street, Anchorage, Alaska, 99501
5. Well Name:
CD1-08
6. Field:
Alpine
a) All wells within one-
quarter mile:
CD1-14, CD1-24, CD1-26 (attached), CD1-07,
CD1-23, CD1-25 (on file)
8. Stratigraphic description:
a) Interval exposed to
open annulus:
Torok and Seabee formation. Shale, siltstone
and sandstone
7. Publicly recorded wells
b) Waste receiving
zone:
Sand layers in the Colville group C-30 in the
Seabee formation
b) water wells within
one mile:
NONE
c) Confinement:
The Schrader Bluff formation provides an upper barrier and marine
shales and claystones of the Lower Cretaceous Torok Formation
provide a lower barrier (Ref. AOGCC Conservation Order No.
443, March 15, 1999)
9. Depth to base of
permafrost:
Est. 1948' MD/1600' TVD
10. Hydrocarbon zones
above waste receiving
zone:
NONE
11. Previous volume disposed in annulus and date: 12. Estimated slurry density:
13. Maximum anticipated pressure at shoe:
398 bbl
Densities range from diesel to 12#/gal.
1974 psi
14. Estimated volume to be disposed with this request:
15. Fluids to be disposed:
11/1/2004
M!6:I(\ DEC f) V7 2D05
@(:;ANa~IiiiooVJ~. . ",' ß
Types of waste may be drilling mud, drilling cuttings, reserve pit fluids, cement-
contaminated drilling mud, completion fluids, diesel, formation fluids associated
with the act of drilling a well, drill rig wash fluids, ccement rinsate, domestic
waste water, any added water needed to facilitate pumping of drilling mud or
drilling cuttings, and any other fluids associated with drilling a well.
35000 bbl
16. Estimated start date:
17. Attachments:
Well Schematic (Include MD and TVD)
[]
Cement Bond Log (if required) D
FIT Records wI LOT Graph []
Surf. Casing Cementing Data []
Other 0
18. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature:
/1 (~
/~
Title: Alpine Drilling Team Leader
Phone
Number: 907-265-6120
Commission Use Only
Conditions of approval: ~ i
()'\>~t:>f'''> ~Ii' ~q:;,RJ...../ ~ t..,~ ,~8ù LOT review and approval:
fY<) «.:C:. C€ t--~ q ~'" .
Subsequent :~;m \ _ L\ d- ~
APProv~
by J
Printed
Name: Chip Alvord
Date:
(!>{/7... (ð t-
At~?W¿ tV f if{, -1Jl-.{
Approval
number:
3D Lf - 3 <?")--
COMMISSIONER
BY ORDER OF THE
COMMISSION
Date:
1'/1/ott-
RBDMS BFL
NOV u 12UU~
Form 10-403AD Rev.9/2003
INSTRUCTIONS ON REVERSE
Submit in Duplicate
ConocoPhillips Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
ConocóPhiIIi ps
October 12, 2004
Alaska Oil and Gas Conservation Commission
333 West 7tl1 Avenue, Suite 100
Anchorage, Alaska 99501-3539
Re: Application for Sundry Approval for Annular Disposal of Drilling Waste on weIrCDt:08
Dear Sir or Madam:
ConocoPhillips Alaska, Inc. hereby requests that CDt-OS be permitted for annular pumping of fluids
occurring as a result of drilling operations, per regulation 20 ACC 25.080. It is intended to begin annular
disposal operations on CDI-08 approximately November 1st, 2004.
Please find attached form 10-403AD and other pertinent information as follows:
1. Annular Disposal Transmittal Form
2. Pressure Calculations for Annular Disposal
3. Surface Casing Description
4. Surface Casing Cementing Report & Daily Drilling Report during cement job
5. Casing and Formation Test Integrity Report (LOT at surface casing shoe).
6. Intermediate Casing Description
7. Intermediate Casing Cementing Report & Daily Drilling Report during cement job
8. Formation LOT on 9-5/8" x T' casing annulus
9. Plan View of Adjacent Wells
10. List of wells on CD 1 pad and the lateral distance from the surface casing shoe,
11. Additional information regarding wells within 1,4 mile radius, not already on file at AOGCC; CD 1-
14, CDl-24, CDI-26
Further details regarding wells on CD 1 pad within 1,4 mile radius should be on file at the AOGCC.
The initial annular LOT (15.3 ppg) and occurred at a lower equivalent mud weight than the casing shoe
test (16.2 ppg LOT). Therefore we conclude that waste will not migrate above the confining zone
provided we do not inject with sustained surface pressures that will cause pressures at the surface shoe to
be in excess of the shoe FIT/LOT.
If you have any questions or require further information, please contact Vern Johnson or Zane Kuenzler
at 265-6081 and 265-1308, respectively. Alternatively, Chip Alvord can also be reached by calling 265-
6120.
~C~;~j? _
Za¿ J&'enz~'--/ ~(Ot.f
Drilling Engineer
cc:
CDI-08 Well File
Chip Alvord
Bill Esco
Sharon Allsup-Drake
ATO-1700
Anadarko
ATO-1530
~
Annular Disposal Transmittal Form
'-'
1. Designation of the well or wells to receive drilling
wastes.
2. The depth to the base of freshwater aquifers and
permafrost, if present.
3. A stratigraphic description of the interval exposed to
the open annulus and other information sufficient to
support a commission finding that the waste will be
confined and will not come to the surface or
contaminate freshwater.
4. A list of all publicly recorded wells within one-
quarter mile and all publicly recorded water wells
within one mile of the well to receive drilling waste.
CD 1-08
There are no USDW aquifers in the Colville River
Unit. Estimated base of Permafrost = 1600' TVD
(RKB )
The Schrader Bluff formation provides an upper barrier
and marine shales and claystones of the Lower
Cretaceous Torok Formation provide a lower barrier.
Calculated water salinities of the Cretaceous and older
stratigraphic sections range from 15000 to 18000 mg/I.
(Ref. AOGCC Conservation Order No. 443, March 15,
1999)
See attached map indicating wells within 1/4 mile.
There are no water wells within 1 mile.
5. Identify the types and maximum volume of waste to Types of waste may be drilling mud, drilling cuttings,
be disposed of and the estimated density of the waste reserve pit fluids, cement-contaminated drilling mud,
slurry. completion fluids, diesel, formation fluids associated
with the act of drilling a well, drill rig wash fluids,
domestic waste water, any added water needed to
facilitate pumping of drilling mud or drilling cuttings,
and any other fluids associated with drilling a well.
Densities range from diesel to 12#/gaI. Maximum
volume to be pumped is 35,000 bbls.
6. Description of any waste sought to be determined as Cement rinsate
drilling waste under h (3) of this section
7. An estimate of maximum anticipated pressure at the Maximum anticipated pressure at casing shoe during
outer casing shoe during annular disposal operation disposal operations is 1974 psi. See attached
and calculations showing how this value was calculation page.
determined.
8. Details that show the shoe of the outer casing is set
below the base of any freshwater aquifer and
permafrost, if present, and cemented with sufficient
cement to provide zone isolation.
9. Details that show the inner and outer casing strings
have sufficient strength in collapse and burst to
withstand anticipated pressure of disposal
operations.
10. Any additional data required by the Commission to NA
confirm containment of drilling wastes.
See attached cementing reports, LOT/FIT reports, a~d
casing reports.
See attached casing summary sheet and calculation
page.
Well
Date
.cG
eJJ
I:
.£ñ
C'=
U
<:>
<:>
<:>
r..:
CD1-08
10/412004
fJ) .;r¡
C'= :\I
eJJ eJJ
Pressure Calculations for Annular Disposal
¢IJ
.5
'rJ:¡
C'=
U
,~
'i.e..
~
~ 2,343 TVD
TOC Est. @ 10,215' MD
6,066' TVD
4 1/2"Tbg
6,928 TVD
Assumptions
Maximwn injection pressure of
Maximwn density of the injection fluid is
Pore pressure at the 95/8" casing shoe is
Gas Gradient is
Header Pressure
1,500
12
0.4525
0.11
2,000
psi
ppg
psilft
psilft
psi
lVlaximum Fluid Density to Burst Surface Casing
Pburst85% = PHydrostatic + PApplied - PFonnation
2,992 = ( 2,343 * 0.052 * MWmax ) + 1500 - ( 0.4525 * 2,343)
MW max
20.9 ppg
Surface Casing String
Size 9.625 in
Weight 36 ppf
Grade J 55
PburstlOO% 3,520 pSI
Pburst85% 2,992 psi
Depth of Shoe 2,343 ft
FIT/LOT @ Shoe 16.2 ppg or 1,974 psi
FIT/LOT for Annulus 15.3 ppg
Max Surf. Pressure 1,500 psi
Maximum Fluid Density to Collapse 2nd Casing String
P colIapse85% = PHydrostatic + P Applied - P Gas Gradient - PHeader
4,599 = ( 6,066 * 0.052 '" MWmax ) + 1,500 - (0.1100 * 6,066) - 2,000
rvIW max
18.3 ppg
2nd Casing String
Size 7 m
Weight 26 ppf
Grade L 80
P collapse 100% 5,410 pSI
P collapse85% 4,599 psi
Top of Cement 6,066 ft
Gas Gradient 0.11 psi/ft
Max Surf. Pressu 1,500 psi
Header Press 2,000 pSI
lVlaximum Allowable Pressure at Surface Casing Shoe
Pmax allowable = Shoe TVD Depth * .052 * Shoe FITILOT
P max allowable =
Pm ax allowable =
2,343 * .052 * 16.2
1,974
psi
~/
---
~
ConocoPhillips
Casing Detail
9 5/8" Surface Casing
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN
Doyon 19 RKB to Landing Ring
FMC Gen V Hanger
Jts 3 to 82 80 Jts 9-5/8" 36# J-55 BTC Csg
Davis Lynch Float Collar
Jts 1 to 2 2 Jts 9-5/8" 36# J-55 BTC Csg
Ray Oil Tools "Silver Bullet" Float Shoe
TO 12 1/4" Surface Hole
RUN TOTAL 45 BOWSPRING CENTRALIZERS -
1 per jt on Jt #1 - #12 (One stop ring on Jt #2)
and over collars on jts# 14, 16, 18, 20, 22, 24, 26, 28, 30,
32,34,36,38,40,42,44,46,48,50,52,54,56,58,60,62
64, 64, 66, 68,70,72,74,76,78
90 joints in the pipe shed. Run 82 joints-8 joints stay out
Use Best-o-Life 2000 pipe dope
Remarks: Up Wt - 180 k
On Wt - 120 k
Block Wt - 75k
Supervisor: D. Lulrick / D. Mickey
Well: CD1-8
Date: 4/30/2004
LENGTH
36.45
2.18
3280.23
1.48
85.80
2.28
DEPTH
TOPS
36.45
38.63
3318.86
3320.34
3406.14
3408.42
3418.42
ConocoPhillips Alaska
Cementing Report
Legal Well Name: CD1-08
Common Well Name: CD1-08
Event Name: ROT - DRILLING
Primary
Hole Size: 12.250 (in)
TMD Set: 3,408 (ft)
Date Set: 4/30/2004
Csg Type: Surface Casing
Csg Size: 9.625 (in.)
Cmtd. Csg: Surface Casing
Cement Co: Dowell Schlumberger
Rot Time Start:
Rec Time Start:17:00
Report #:
Start:
1
4/27/2004
Cement Job Type: Primary
Squeeze Open Hole
Hole Size:
SO TMD: (ft)
SO Date:
SO Type:
i
I Cmtd. Csg:
Squeeze Casing
Hole Size:
TMD Set:
Date Set:
Csg Type:
SO TMD:
SO Date:
Cmtd. Csg:
Page 1 of 3
Spud Date: 4/28/2004
Report Date: 4/30/2004
End: 5/14/2004
Plug
Hole Size:
Top Set: (ft)
BTM set: (ft)
Plug Date:
Plug Type:
Drilled Out:
Cmtd. Csg:
Cementer: Jim Thompson
Pipe Movement
Pipe Movement: Reciprocating
Time End:
Time End: 20:23
RPM:
SPM:
Init Torque: (ft-Ibf)
Stroke Length: 25.0 (ft)
Avg Torque: (ft-Ibf) Max Torque: (ft-Ibf)
Drag Up: 180,000 (Ibs) Drag Down: 120,000 (Ibs)
Type: Cement Casing
Volume Excess %: 100.00
Meas. From: 157
Time Circ Prior
To Cementing: 1.50
Mud Circ Rate: 294 (gpm)
Mud Circ Press: 380 (psi)
Stage No:1 of1
Start Mix Cmt: 19:09
Start Slurry Displ: 19:09
Start Displ: 20:18
End Pumping: 20:56
End Pump Date: 4/30/2004
Top Plug: Y
i Bottom Plug: Y
Disp Avg Rate:
Disp Max Rate:
Bump Plug:
Press Prior:
Press Bumped:
Press Held:
Float Held:
7.00 (bbl/min)
7.00 (bbl/min)
Y
610 (psi)
1,100 (psi)
5 (min)
Y
Returns: 100
Total Mud Lost: (bbl)
I Cmt Vol to Surf: 157.00 (bbl)
i
I
¡ Ann Flow After: N
Mixing Method:
Density Meas By: densometer
Type: Spud Mud Density: 9.8 (ppg) Vise: 75 (s/qt)
Bottom Hole Circulating Temperature: (OF)
Displacement Fluid Type:Mud
PV /yP: 27 (cp)/21 (lb/100fF) Gels 10 see: 5 (lb/100ft2) Gels 10 min: 13 (lb/1 00ft2)
Bottom Hole Static Temperature: (OF)
Density: 9.8 (ppg) Volume: 236.70 (bbl)
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft) To: (ft)
Water Source: lake water
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Mud Data
StagéNo: 1 Sh.lrry No: t of4
Description: Biozan water wlnut plug
Cmt Vol: 40.0 (bbl) Density: 8.30 (ppg)
Slurry Vol: (sk) Water Vol: (bbl)
Class:
Yield: (fP/sk)
Other Vol: 0
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Purpose: Wash
Mix Water: (gal)
Foam Job: N
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Printed: 10/1/2004 11 :50:29 AM
~
ConocoPhilHpsAla~ka
Cementing Report
Legal Well Name: CD1-08
Common Well Name: CD1-08
Event Name: ROT - DRILLING
Slurry Data
Fluid Type: Spacer
Slurry Interval: (ft)
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Slurry Data
Fluid Type: LEAD
Slurry Interval: 2,908.00 (ft}To: (ft)
Water Source: lake water
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Report #:
Start:
1
4/27/2004
Page 2 of 3
Spud Date: 4/28/2004
Report Date: 4/30/2004
End: 5/14/2004
StageNo:1SturryNo:2of4
To: (ft)
Description: MUD PUSH XL
Cmt Vol: 50.0 (bbl) Density: 10.50 (ppg)
Slurry Vol: (sk) Water Vol: (bbl)
Class:
Yield: (ft3/sk)
Other Vol: 0
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Pressure
(psi)
(psi)
StageNC):>t SlurryNC):3014
Description: ASLite
Cmt Vol: 401.0 (bbl)
Slurry Vol:526 (sk)
Class:
Density: 10.70 (ppg) Yield: 4.28 (fP/sk)
Water Vol: 243.0 (bbl) Other Vol: 0
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Stage No: 1 Slurry No: 4 of 4
Slurry Data
Fluid Type: TAIL Description:
Slurry Interval: 34,080.00 (ffþ: 2,908.00 (ft) Cmt Vol: 47.0 (bbl)
Water Source: lake water Slurry Vol235 (sk)
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Temp
(OF)
(OF)
Density: 15.80 (ppg)
Water Vol: 29.0 (bbl)
Class: G
Yield: 1.16 (fP/sk)
Other Vol: 0
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Purpose: PRIMARY
Mix Water: 19.40 (gal)
Foam Job: N
Pressure
(psi)
(psi)
Purpose: PRIMARY
Mix Water: 5.10 (gal)
Foam Job: N
Pressure
(psi)
(psi)
Printed: 10/1/2004 11 :50:29 AM
ConocoPhillips Alaska
Cementing Report
Page 3 of 3
Legal Well Name: CD1-08
Common Well Name: CD1-08
Event Name: ROT - DRILLING
Report #:
Start:
1
4/27/2004
Spud Date: 4/28/2004
Report Date: 4/30/2004
End: 5/14/2004
Casing Test
Shoe Test
Liner Top Test
Test Press: 2,500 (psi)
For: 30 (min)
Cement Found between
Shoe and Collar: N
Pressure: 16.20 (ppge)
Tool: N
Open Hole: 30 (ft)
Hrs Before Test:
Liner Lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool: N
Tool: N
Tool: N
Log/Survey Evaluation
Interpretation Summary
CBL Run: N
Under Pressure: (psi)
Bond Quality:
Cet Run: N
Bond Quality:
Temp Survey: N
Hrs Prior to Log:
Cement Top: (ft)
How Determined:
TOC Sufficient: N
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required: N
Number of Remedial Squeezes:
Remarks
Cement 9 5/8" casing as follows: Pumped 40 bbls Biozan water wi nut plug for marker wi rig pump - Switch over to Dowell - Pumped 5
bbls water - Tested lines to 2500 psi - Dropped bottom plug - Mixed & pumped 50 bbls Mud Push XL spacer @ 10.5 ppg @ 5.6 bpm @
214 psi - Mix & purrp Lead slurry(AS3Iite) @ 10.7 ppg @ 7.4 bpm @ 200 psi· Observed nut plug @ shakers wi 384 bbls lead slurry
pumped - pumped down tub - total of 401 bbls lead (526 sks) - Mixed & pumped Tail slurry (Class G wi .20% D46, .30% D65, 2% S001)
47 bbls (227 sks) @ 15.8 ppg @ 4.6 bpm @ 250 psi - Dropped top plug wi 20 bbls water f/ Dowell - Switched over to rig pumps &
displaced cement w/236.7 bbls 9.8 ppg mud @ 7 bpm @ 470 to 750 psi for first 220 bbls displacement - slowed pumps to 4 bpm for last
16.7 bbls @ 570 to 610 psi - Bumped plug wi 1100 psi - Floats held - CIP @ 2056 hrs.
Full returns throughout job wI 157 bbls cement returns to surface
Printed: 10/1/2004 11 :50:29 AM
....
~
ConocoPhiUip$Alaska, ·11'10.
DáilyDriU¡hg..·Reporf
Pagelof 3
I JOB NUMBER I EVENT CODE 124 HRS PROG TMD I TVD I DFS
CD1-08 ODR 3,418.0 2,348.0 3.00
SUPERVISOR I RIG NAME & NO. I FIELD NAME lacs NO. AUTH MD I DAILY TANG
D. Lutrick I D. Mickey Doyon Drilling Inc 19 ALPINE 17,264.0 0
CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INT WIO MUD
WELL NAME
Testing BOPE
o
I REPT NO. I DATE
4 4/30/2004
I CUM. TANGO
CUM INT ANG WI MUD
o
CUM COST WI MUD
774,468
DATE OF LAST SAFETY MEETING DAILY TOTAL
301,183
AUTH.
24 HR FORECAST
Finish testing BOPE - MU BHA #2 - FIT - Drill 8 1/2" hole
LITHOLOGY I JAR HRS OF SERVICE / BHA HRS SINCE INSP I LEAKOFF
LAST SURVEY: DATE TMD INC AZIM I LAST CASING
4/29/2004 3,368.58 59.440 116.680 9.625 (in) @ 3,408.0 (ft)
DENSITY(ppg) 9.80 I PP I I ECD I IMLJDDÄl"AlóAILycq$T
FV PVNP GELS WUHTHP FCIT.SOL OILIWAT %SCinctlMBT Ph/pM
285 36/56 29/113 6.81 31 I 0.8/28.0 9.01
BHA NO. I 1 I
BHA WT. BELOW JARS
10033290
I NEXT CASING
7.000 (in) @ 12,457.0 (ft)
o CUMCOStj
Pf/Mf CI Ca
0.05/0 20
AFE
STRING WT. UP
BHA I HOLE CONDITIÖNS
STRING WT. DN STRING WT. ROT
ITEM DESCRIPTION
NOJTS
1
1
1
1
1
1
1
1
1
1
1
1
1
3
1
23
Bit
Mud Motor
Sub - Float
Stabilizer
Crossover - Non Mag
MWD
MWD
MWD
Sub - Bottom Hole Orienting
Drill Collar - Non Mag
Drill Collar - Non Mag
Drill Collar - Non Mag
Crossover
Drill Pipe - Heavy Wgt
Jars
Drill Pipe - Heavy Wgt
BIT I RUN
1 I
SIZE MANUF. TYPE
12.250 HUGHES-CHR MX-C1
SERIAL NO.
5048936
LAST BOP PRES TEST
H2S
o
LIME
ES
12.250
8.000
8.000
8.150
8.140
8.020
8.020
8.090
8. 000
2.812
8.062
8.062
6.750
5.000
6.130
5.000
TORQUE I UNITS
BIT NO. I 1
BHA LENGTH
978.16
CONN.SIZE CONN TYPE
. ·lI:.NGTH
1.00
31.07
2.40
5.92
2.44
9.17
8.70
9.90
2.45
30.80
31.03
31.03
3.02
90.64
32.80
685.79
BITS
JETS OR TFA
12/16/16/18/1
4.500
5.000
2.870
2.875
2.875
3.500
1.920
1.900
2.813
2.875
2.880
2.880
2.780
3.000
2.500
3.000
DEPTH IN DATE IN I-O-D-L-B-G-O-R
114.0 4/28/2004 1-1-WT-A-E-2-NO-TD
BIT I RUN
WOB
BIT OPERATIONS
RPM I GPM I PRESS I P BIT I HRS I 24Hr DIST I 24Hr ROP I CUM HRS I CUM DEPTH I CUM ROP
OPERATIONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION
00:00 00:30 0.50 DRILL P CIRC SURFAC Finish circ and cond mud for csg job. at 650 gpm - 2500 psi - 80 rpms.
00:30 01:45 1.25 DRILL P TRIP SURFAC Check flow. Blow down top drive. POH on trip tank to 1831'. 50k overpull at
1831'.
01:45 03:15 1.50 DRILL Np DH TRIP SURFAC RIH to 1901'. Back ream wi pump at 400 gpm and 40 rpms to 1435'.
03:15 03:45 0.50 DRILL P TRIP SURFAC POH on trip tank to 1042'. 15k over and slight swabbing.
03:45 04:15 0.50 DRILL Np DH TRIP SURFAC Back ream wI pump at 400 gpm and 40 rpms to 883'. Check flow. (OK)
04:15 05:00 0.75 DRILL P TRIP SURFAC POH on trip tank to 255'. Std back HWDP and jars.
05:00 07:45 2.75 DRILL P PULD SURFAC LD BHA #1.
Printed: 10/1/2004 11:53:34 AM
Page 2 of 3
C01-08
ConocoPhillipsAlaska, Inc.
Daily Drilling Report
I.JOB NUMBER I· EVENT CODE 124 HRS PROG ITMD
! ODR I 3,418.0
TVD IDFS
I 2,348.0 3.00
I REPT NO.
I 4
I DATE
I 4/30/2004
WELL NAME
OPERATIONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION
07:45 09:30 1.75 CASE P RURD SURFAC RU to run 9 5/8" csg.
09:30 09:45 0.25 CASE P SFTY SURFAC PJSM on running csg.
09:45 15:30 5.75 CASE P RUNC SURFAC Run 95/8" 36# J-55 BTC casing as follows: FS(Ray Oil Tool"Silver Bullet") 2
jts. FC (Weatherford) - 2 jts. ( fill pipe & check floats - 1st. 4 connections
made up wI BakerLoc) - 45 jts. (49 total) - Break circ @ 2010' & circ btms up -
continue running pipe - 31 jts. (80 total) to 3286' - Casing tong broke
15:30 16:00 0.50 CASE T EQIP CIRC SURFAC Change out casing tongs - Circ @ 3.5 BPM @ 300 psi while changing out
tongs
16:00 16:30 0.50 CASE P RUNC SURFAC Finish running 9 5/8" 36# J-55 BTC csg. ·2 jts.(82jts total) PU hanger &
landing jt. - land casing on FMC fluted hanger on landing ring wI shoe @ 3408'
& FC @ 3319'
16:30 17:00 0.50 CASE P RURD SURFAC RD casing tongs, Frank's fill up tool - blow down TD - RU cement head & lines
17:00 18:30 1.50 CEMENT P CIRC SURFAC Break circulation - Circulate & condition for cement job - ICR 3.5 bpm @ 290
psi - FCR 7 bpm @ 380 psi
18:30 18:45 0.25 CEMENT ~ SFTY SURFAC Held PJSM for cement procedure
18:45 21:00 2.25 CEMENT PUMP SURFAC Cement 9 5/8" casing as follows: Pumped 40 bbls Biozan water wi nut plug for
marker wi rig pump - Switch over to Dowell - Pumped 5 bbls water - Tested
lines to 2500 psi - Dropped bottom plug - Mixed & pumped 50 bbls Mud Push
XL spacer @ 10.5 ppg @ 5.6 bpm @ 214 psi - Mix& pump Lead slurry(AS3
lite) @ 10.7 ppg @ 7.4 bpm @ 200 psi - Observed nut plug @ shakers wi 384
bbls lead slurry pumped - pumped down tub - total of 401 bbls lead (526 sks) -
Mixed & pumped Tail slurry (Class G wi .20% 046, .30% D65, 2% S001) 47
bbls (227 sks) @ 15.8 ppg @ 4.6 bpm @ 250 psi - Dropped top plug wi 20
bbls water fl Dowell - Switched over to rig pumps & displaced cement wi 236.7
bbls 9.8 ppg mud @ 7 bpm @ 470 to 750 psi for first 220 bbls displacement-
slowed pumps to 4 bpm for last 16.7 bbls @ 570 to 610 psi - Bumped plug wi
1100 psi - Floats held - CIP @ 2056 hrs.
Full returns throughout job wi 157 bbls cement returns to surface
21:00 22:00 1.00 CEMENT P OTHR SURFAC RU & test 9 5/8" casing to 2500 psi for 30 mins. - RD test equipment
22:00 23:00 1.00 CEMENT P PULD SURFAC RD cement lines & cement head - LD long bails, casing elevators, & landing
jt.- blow down cement line
23:00 00:00 I 1.00 I WELCTL 11 NUND SURFAC ND riser - CIO junk sub
24 HR SUMMARY: POOH - LD BHA #1 - RU & run 82 jts. 9 5/8" csg wi shoe to 3408' - Cement wi 401 bbls lead slurry & 47 bbls tail -
Displaced cmt. CIP @ 2056 hrs. - Test csg to 2500 psi - ND cmt. equip. NO riser
COMPANY
ConocoPhillips Company
Fairweather E&P Service
Doyon Drilling Inc
Dowell
Halliburton - Sperry-Sun
SERVICE
PERSONNEL DATA
Ii
NO. HOURS I! COMPANY
1 1! Halliburton - Sperry-Sun
11 M-I Drilling Fluids
26 :1 Swaco
2 ; Ii Arctic Catering Inc.
2 I Ii FMC Corporation Wellhe
SERVICE
NO. ! HOURS
2:
3
4
5
1
ITEM
UNITS
gals
bbls
USAGE
2,735
1,215
MATERIALS/CONSUMPTION
, ON HAND '! ITEM
15,860 ¡ Water, Potable
360
UNITS
bbls
USAGE
120
ON HAND
-360
Fuel
Water, Drilling
Printed: 10/1/2004 11 :53:34 AM
WELL NAME
CD1-08
RESERVOIR NAME
CD1-7
CD1-8
iL.....~
COhOCoPhillipsAlaska,Jnê~
DanyDrUIir1gR~pørt
I JOB NUMBER I EVE~DC~DE 124 HRS PROG IT;~418.0
RESERVOIR AND INTERVAL DATA
ZONE TOP BASE
1467 3.5 1120
',,-/
Page 3 of 3
ITVD I DFS
2,348.0 3.00
I REPT NO. I DATE
4 4/30/2004
COMMENTS
Printed: 10/1/2004 11 :53:34 AM
PRESSURE INTEGRITY TEST
CONOCOPHILLIPS Alaska, Inc.
Doyon 1 9 Date: 4/30/2004 Volume Input
I Pump used: I #.2...._M. ud Pump I ~
. --..~ Strokes T 0.1000 Bbls/Strk T
... Pumping down annulus and DP. ...
Well Name:
Drilling Supervisor:
CD 1 -08
Ri9:
Lutrick/M ickey
Type of Test: OpenholeTest LOT/FIT
Hole Size: 8-1/2" I'" Casing Shoe Depth I Hole Depth
RKB-CHF: 36.51 Ft 3,408 1 Ft-MDI_ 2,3431 Ft- TVD .______..__.-ª_~~_~ª_lEt~_º_._J___?2.3581 Ft-:: TVD
Casinq Size and Description: 19-5/8" 36#/Ft J-55 BTC 1...\
CasinQ Test Pressure InteqritvTest
Mud Weight: 9.8 ppg Mud Weight: 9.6 ppg
Mud 10 min Gel: 13.0 Lb/100 Ft2 Mud 10 min Gel: 13.0 Lb/100 Ft2
Test Pressure: 2,500 psi Rotating Weight: 115,000 Lbs
Rotating Weight: 75,000 Lbs Blocks/Top Drive Weight: 75,000 Lbs
Blocks/Top Drive Weight: 75,000 Lbs Desired PIT EMW: 18.0 ppg
EsU,!,ates f()r_Ie~t: .. ... .l.5 _1>IJ1s . R ~~~~___tO~~_ 1 bb'j"'l
EMW = leak-off Pressure + Mud Weight = 810 96
0.052 x TVD 0.052 x 2343 + .
EMW at 3408 Ft-MD (2343 Ft- TVD) = 16.2 ppg
PIT 15 Second
Shut-in Pressure, psi
710
3000 -
2500 . ,~
2000 /
w
a: ~
:J /
C/) 1500
C/) /" /" ~~ì)'1
w
a:
a.
1000
500
- Lost 0 psi during test, held 100%-
::: of test pressure. -
mi:trA..~wl\.tl 1 1 A
o
II~
~~IO~'"
U¡1iI"_ldI~~j...
o
2 3
Barrels
4 0 5 10 15 20 25 30
Shut-In time, Minutes
o PIT Point
.....CASING TEST
---LEAK-OFF TEST
Comments:
Tested 9 5/8" casing after bumping plugs on cement job.
Volume/Stroke
Pump Rate:
Casing Test
Pressure Integrity Test
6.0 Strkjmin
T
Pumping Shut-in Pumping
Strks psi Min psi Strks psi
0 0 0 2550 0 0
2 100 1 2550 1 10
4 250 2 2550 2 30
6 500 3 2550 3 60
8 700 4 2550 4 120
10 850 5 2550 5 210
12 1000 6 2550 6 290
14 1150 7 2550 7 370
16 1300 8 2550 8 440
18 1500 9 2550 9 510
20 1650 10 2550 10 560
22 1800 15 2550 11 630
24 2050 20 2550 12 700
26 2200 25 2550 13 770
28 2400 30 2550 14 810
30 2550 15 830
16 840
17
18
19
20
Volume
Pumped
3.0 Bbls
Volume
Bled Back
IBbls
Volume
Pumped
2.0 Obis
Shut-in
Min psi
o 840
0.25 710
0.5 660
1 630
1.5 ")
2 vlO
2.5 605
3 600
3.5 590
4 590
4.5 590
5 585
5.5 585
6 580
6.5 580
7 575
7.5 575
8 570
8.5 570
9 570
9.5 F"'7f)
10
Volume
Bled Back
Itsbls
,-,.
y
ConocoPhillips
Casing Detail
7" Intermediate Casing
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN
Doyon 19 RKB to LDS
FMC 11" X 7" Hanger
Jts 3 to 294 292 Jts 7" 26# L-80 STCM Csg
7" Weatherford Float Collar
Jts 1 to 2 2 Jts 7" 26# L-80 STCM Csg
7" Ray Oil Tools Float Shoe(Silver bullet)
7" Shoe @ 12,515.07 MD 6927' TVD
TD of 8-1/2" hole @ 12525' MD 6928' TVD
Top of Alpine C - 12415' MD 6916' TVD
Total Centralizers: 61
Straight blade centralizer one per jt on jts # 1-15
Straight blade centralizer one per jt on jts. # 39,40,41,42
Straight blade centralizer one per jt on # 212,213,214
Straight blade centralizer one per jt on every other joint
Starting @ # 216 to 292
305 joints in shed - 294 total jts. to run
Last 11 jts. out
Remarks:
Use Best-o-Life 2000 pipe dope
Drifted to 6.151
MU Torque 7800 ft/lbs.
Up Wt =330 K On Wt = 155 K Block Wt= 76K
,.-/
Well: CD1-08
Date: 05/07/04
LENGTH
34.70
1.62
12391.03
1.30
84.30
2.12
Supervisor: Mickey / Kuenzler
DEPTH
TOPS
34.70
36.32
12427.35
12428.65
12512.95
12515.07
ConocoPhillips Alaska
Cementing Report
Legal Well Name: CD1-08
Common Well Name: CD1-08
Event Name: ROT - DRILLING
Primary
Hole Size: 8.500 (in)
TMD Set: 12,515 (ft)
Date Set: 51712004
Csg Type: Production Casing
Csg Size: 7.000 (in.)
Cmtd. Csg: Production Casing
Cement Co: Dowell Schlumberger
Rot Time Start:
Rec Time Start:
Time End:
Time End:
Type: Cement Casing
Volume Excess %: 40.00
Meas. From: 0
Time Circ Prior
To Cementing: 2.15
Mud Circ Rate: 210 (gpm)
Mud Circ Press: 620 (psi)
Report #:
Start:
2
4/27/2004
Cement Job Type: Primary
Squeeze Open Hole
Hole Size:
SO TMD: (ft)
SO Date:
SO Type:
Cmtd. Csg:
Squeeze Casing
Hole Size:
TMD Set:
Date Set:
Csg Type:
SO TMD:
SO Date:
Cmtd. Csg:
Cementer: Jim Thompson
Pipe Movement
Pipe Movement: No movement
RPM:
SPM:
Init Torque:
Stroke Length:
I
I Start Mix Cmt: 00:57
Start Slurry Displ: 00:57
Start Displ: 01 :22
End Pumping: 02:51
End Pump Date: 5/8/2004
Top Plug: Y
Bottom Plug: Y
Type: Non-Disp. LS Density: 9.8 (ppg) Visc: 44 (s/qt)
Bottom Hole Circulating Temperature: (OF)
Displacement Fluid Type:Mud
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft)
Water Source: Lake
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: eF)
(ft-Ibf)
(ft)
Avg Torque: (ft-Ibf)
Drag Up: (Ibs)
Page 1 of 3
Spud Date: 4/28/2004
Report Date: 5/8/2004
End: 5/14/2004
Plug
Hole Size:
Top Set: (ft)
BTM set: (ft)
Plug Date:
Plug Type:
Drilled Out:
Cmtd. Csg:
Max Torque: (ft-Ibf)
Drag Down: (Ibs)
Returns: 100
Total Mud Lost: (bbl)
Cmt Vol to Surf: (bbl)
Ann Flow After: N
Mixing Method: Tub
Density Meas By: Densometer
PV/yP: 9 (cp)/21 (lb/100fF) Gels 10 see: 8 (lb/100ft2) Gels 10 min: 10 (lb/100ft2)
Bottom Hole Static Temperature: (OF)
Density: 9.8 (ppg) Volume: 456.00 (bbl)
Stage No: 1 of 1
Disp Avg Rate:
Disp Max Rate:
Bump Plug:
Press Prior:
Press Bumped:
Press Held:
Float Held:
5.00 (bbl/min)
5.20 (bbl/min)
Y
620 (psi)
1,100 (psi)
2 (min)
Y
Mud·Data
Stage No: 1 Slurry No: 1 of 3
To: (ft)
Description: MUD PUSH XL
Cmt Vol: 20.0 (bbl) Density: 10.50 (ppg)
Slurry Vol: (sk) Water Vol: (bbl)
Class:
Yield: (fP/sk)
Other Vol: 0
Temperature: CF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Printed: 10/1í2004 11 :50:47 AM
-...
~.
Page 2 of 3
ConocoPhillips Alaska
Cementing Report
Legal Well Name: CD1-08
Common Well Name: CD1-08
Event Name: ROT - DRILLING
Report #:
Start:
Spud Date: 4/28/2004
Report Date: 5/8/2004
End: 5/14/2004
2
4/27/2004
Stage .·No: 1SlurryNo:>2ó13
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Slurry Data
Fluid Type: LEAD Description: LiteCRETE
Slurry Interval: 11,915.00 (fI}o: 1 0,215.00 (ft~mt Vol: 53.0 (bbl)
Water Source: Lake Slurry Vol:90 (sk)
Trade Name
D-53
D-46
D-79
S1
D-124
D-44
D-65
Class:
Density: 11.00 (ppg) Yield: 3.35 (ft3/sk)
Water Vol: 42.0 (bbl) Other Vol: 0
Purpose: PRIMARY
Mix Water: 19.40 (gal)
Foam Job: N
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Stage No:.t Slurl'vNC):2Óf3>·<'«dc.iitiv*s
Type
GYPSUM
DEFOAMER
EXTENDER
ACCELERATOR
FILUTE
ACCELERATOR
DISPERSANT
Concentration ··Uilits
30.00 %BWOC
0.60 %BWOC
1.50 %BWOC
1.50 %BWOC
43.10 %BWOC
9.00 %BWOW
0.50 %BWOC
kiqÙÎdGonc, .
Units
Stage No: 1 Slurry No: 3 of 3
Slurry Data
Fluid Type: TAI,L Description:
Slurry Interval: 12,515.00 (fI}o: 11,915.00 (ft~mt Vol: 22.0 (bbl)
Water Source: Lake Slurry Vol:108 (sk)
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Trade Name
0-46
D-65
S1
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Density: 15.80 (ppg)
Water Vol: 13.1 (bbl)
Class: G
Yield: 1.17 (ft3/sk)
Other Vol: 0
Purpose: PRIMARY
Mix Water: 5.1 0 (gal)
Foam Job: N
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
CF)
Pressure
(psi)
(psi)
Stage No: 1 Slurry No: 3 of 3 . Additives
Type
DEFOAMER
DISPERSANT
I ACCELERATOR
Concentration I Units
0.20' %BWOC
0.25 %BWOC
2.00. %BWOC
I
Liquid Cone.
Units
Printed: 10/1/2004 11:50:47 AM
ConocoPhillips Alaska
Cementing Report
Page 3 of 3
Legal Well Name: CD1-08
Common Well Name: CD1-08
Event Name: ROT - DRILLING
Report #:
Start:
2
4/27/2004
Spud Date: 4/28/2004
Report Date: 5/8/2004
End: 5/1 4/2004
Casing Test
Shoe Test
Liner Top Test
Test Press: 3,500 (psi)
For: 30 (min)
Cement Found between
Shoe and Collar: N
Pressure: 12.50 (ppge)
Tool: N
Open Hole: 30 (ft)
Hrs Before Test:
I
Liner Lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool: N
Tool: N
Tool: N
LoglSurveyEvaluation
Interpretation Summary
CBL Run: N
Under Pressure: (psi)
Bond Quality:
Cet Run: N
Bond Quality:
Temp Survey: N
Hrs Prior to Log:
Cement Top: (ft)
How Determined:
TOC Sufficient: N
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required: N
Number of Remedial Squeezes:
Remarks
Cement 7" casing as follows: Pumped 10 bbls CW 100 @ 8.3 ppg - Test lines to 3500 psi (1st test failed due to leaking valve on manifold
- replaced) - pumped 75 bbls CW -100 @ 8.3 ppg - 4 BPM @ 640 psi - Pumped 20 bbls Mudpush XL @ 10.5 ppg - 4 BPM @ 630 psi -
Dropped btm plug @ 0057 hrs - Mixed & pumped 53 bbls Lead slurry (11 ppg LiteCrete wi additives) @ 4.8 BPM @ 675 psi - Mixed and
pumped 22 bbls Tail slurry (15.8 ppg Class G wi additives) @ 4.5 BPM @ 560 psi. Dropped top plug wi 20 bbls water fI Dowell
Switch over to rig pumps & displace cement wi 9.8 ppg LSND mud - ICR 5.0 BPM @ 500 psi - wI 437 bbls away slowed rate to 4 BPM @
600 psi - wi 450 bbls away slowed rate to 3.0 BPM @ 660 psi - Bumped plug wi 4521 stks (452 bbls. I calc. 456 bbls) wi 1100 psi - check
floats - floats held CIP @ 0251 hrs.
Full returns through out job
Printed: 10/1/2004 11 :50:47 AM
'-.-"
'----'
ConocoPhilli.psAI~ska,lrlC.
ÐailyDrUIiOg·Report
I JOB NUMBER EVENT CODE /24 HRS PROG TMD I TVD I DFS
CD1-08 ODR 12,525.0 6,928.0 10.00
SUPERVISOR I RIG NAME & NO. I FIELD NAME I OCS NO. AUTH MD I DAILY TANG
D.Mickey I Z. Kuenzler Doyon Drilling Inc 19 ALPINE 17,264.0 0
CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INT WIO MUD
Changing rams to 3-1/2"X6" VBR, readying for BOPE test 0
24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL
BOPE test, M/U 6.125" BHA, PIU 126 jts 4" DP, DSHO, FIT. 5/4/2004 90,900
LITHOLOGY I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE
16.25 1 0033290
LAST SURVEY: DATE TMD INC AZIM I LAST CASING I NEXT CASING
5/5/2004 12,454.81 83.626 144.130 9.625 (in) @ 3,408.0 (ft) 7.000 (in) @ 12,457.0 (ft)
DENSITY(ppg) 9.80 I pp I I ECD 11.77IVIÜDDATA()AILYCOst 0 CUMCØS'r I
FV PVIYP GELS WUHTHP FCIT.SOL OILlWAT %S8nd/MBT Ph/pM PfIMf CI C~
44 9/24 9/11 3.6/8.4 11 I 0.2/17.5 9.01 0.05/2 20
WELL NAME
I REPT NO. I DATE
11 5n 12004
CUM.TANGO
CUM INT ANG WI MUD
o
CUM COST WI MUD
1,851,885
AUTH.
LAST BOP PRES TEST
5/1/2004
H2S
o
LIME
ES
OPERATIONSSOMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE С;:SGBIPTtON
00:00 01:00 1.00 CASE P RURD INTRM1 LD short bails - PU stack washer & flush stack - Pull wear bushing
01:00 02:00 1.00 CASE P RURD INTRM1 Set test plug - change top pipe rams to 7" - PU Frank's fill up tool
02:00 03:00 1.00 CASE P RURD INTRM1 Test 7" rams to 250 & 5000 psi - Pull test plug - set thin wall wear bushing
03:00 04:00 1.00 CASE P RURD INTRM1 Finish rigging up to run casing - Held PJSM
04:00 08:00 4.00 CASE P RUNC INTRM1 Run 7" 26# L-80 MBTC casing as follows: FS (Ray Oil Tools Silver bullet) 2
jts. - FC (Weatherford) 2 jts - fill pipe & check floats (1 st 4 connections made
up wi BakerLoc) Note - Tore packer cup on fill up tool while stabbing in to
check floats - Continue running casing ran total of 80 jts. to 3387'
08:00 08:30 0.50 CASE P CIRC INTRM1 Establish circulation & circ casing volume (130 bbls) @ 5 bpm 350 psi
08:30 09:45 1.25 CASE T EQIP OTHR INTRM1 Change out Frank's fill up tool
09:45 14:00 4.25 CASE P RUNC INTRM1 Continue running 7" 26# L-80 MSTC casing f/3387' to 7205' ( 170 jts. total)
14:00 15:00 1.00 CASE P CIRC INTRM1 Establish circulation & circulate btms up + @ 5 BPM @ 570 psi ICP to 500 psi
FCP - PU wt. 200 SO 150
15:00 18:30 3.50 CASE P RUNC INTRM1 Continue running 7" 26# L-80 MSTC casing f/7205' to 11 ,044' (260 jts. total)
18:30 20:00 1.50 CASE P CIRC I NTRM 1 Establish circulation & circulate btms up+ @ 5.2 SPM - FCP 630 psi.
PUW::315K SOW=150K
20:00 21:00 1.00 CASE P RUNC INTRM1 Cont'd to RIH with casing from 11044'-12515'.(294 jts. total) PU hanger &
landing jt. -land 7" on FMC fluted hangerwl shoe @ 12,515' & FC @ 12,427'
21:00 22:00 1.00 CEMENT P PULD INTRM1 RID slips and Frank's fill up tool, RlU cement head.
22:00 00:00 2.00 CEMENT P CIRC INTRM1 Circ'd @ 3 BPM - ICP 650 psi. Attempted to reciprocate pipe, P/U to 375K
four times with no movement. Re-Ianded casing and continued to circulate.
24 HR SUMMARY: Changed rams for 7" casing run. Completed casing run to 12515' with circulation stops @ 3387',7205', and 11044'.
Landed and circulated in preparation for cementing program.
COMPANY
ConocoPhillips Company
Fairweather E&P Service
Doyon Drilling Inc
Dowell
Halliburton - Sperry-Sun
Halliburton - Sperry-Sun
SERVICE
PERSONNEL DATA
NO. HOURS COMPANY
1 M-I Drilling Fluids
1 Swaco
26 Arctic Catering Inc.
2 AOGCC - Alaska Oil & G
2 Quadco / Totco
2 II FMC Corporation Wellhe
SERVICE
NO. HOURS
3
4
5
1
1
1
Printed: 10/1/2004 11 :54: 10 AM
WELL NAME
ITEM
Fuel
Water, Drilling
RESERVOIR NAME
CD1-7
CD 1-08
UNITS
gals
bbls
CD1-8
ConocoPhillips Alaska, Inc.
Daily Drilling Report
I JOB NUMBER I EVENT CODE 124 HRS PROG I TMD ¡ TVD
! I ODR i I 12,525.0 I 6,928.0
USAGE
2,121
100
MATERIALS I CONSUMPTION
I ON HAND ITEM
11,644 Water, Potable
-4,970
UNITS
bbls
RESERVOIR AND INTERVAL DATA
ZONE TOP I BASE
20 ! 2 1200
IDFS
I 10.00
USAGE
COMMENTS
I REPT NO.
I
i 11
Page 2 of 2
I DATE
! 5/7/2004
ON HAND
-720
Printed: 10i1/2004 11:54:10AM
ConocoPhiUiPs/Alð$kaJ Inc.
Ðaily·OrillingRØpórt
¡JOB NUMBER EVENT CODE /24 HRS PROG TMD TVD DFS
CD1-08 ODR 12,525.0 6,928.0 11.00
SUPERVISOR I RIG NAME & NO. I FIELD NAME lacs NO. AUTH MD I DAILY TANG
D. Mickey I Z. Kuenzler Doyon Drilling Inc 19 ALPINE 17,264.0 0
CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INT WIO MUD
-
WELL NAME
Circulate for FIT
24 HR FORECAST
'~
Pagelof2
o
I REPT NO. DATE
12 5/8/2004
ICUM. TANGO
CUM INT ANG WI MUD
o
CUM COST WI MUD
2,295,302
DATE OF LAST SAFETY MEETING DAILY TOTAL
AUTH.
Drill 6-1/8" hole per geologists 5/4/2004
I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE
16.25 10033290
INC AZIM I LAST CASING I NEXT CASING
83.626 144.130 9.625 (in) @ 3,408.0 (ft) 7.000 (in) @ 12,457.0 (ft)
9.80 Ipp ECD9.80 .MlJDDA'T'ÄI[)ÂllYC()sT 0 CUMÓqst·
GELS WUHTHP FCrr.SOL OIUWAT %Si!ln.dlMBT Ph/pM ÞfIMf CI ·Gà
6/8 3.8/8.8 11 0.1/17.5 8.81 0.01/2 20
LITHOLOGY
LAST SURVEY: DATE TMD
5/512004 12,454.81
DENSITY(ppg)
FV PVNP
39 8/16
BHANO. I 5
BHA WT. BELOW JARS
STRING WT. UP
BHAIHOt.ECONDI1]()Ns.·.·
STRING<WT.pN STRING WT. ROT
TORQUE I UNITS
E3ITNO.il 4
BHA LENGTH
375.52
<ùONNslzE CONN TYPE
ITEM DESCRIPTION
. NOJ1'S
1
1
1
1
4
3
1
3
1
2
Bit
5" Motor
IB Stabilizer - 6 1/8"
Float Sub
MWD
3 X NM Drill Collars
XO
3 X HWDP
Jars
2 X HWDP
BIT I RUN
41 5
SIZE MANUF. TYPE
6.125 HUGHES-CHR HC 306
SERIAL NO.
7104036
LENGTH
0.80
32.57
5.53
2.40
54.48
93.16
1.19
92.05
31.97
61.37
BITS
JETS OR TFA
12/12/13/13/13/13
6.125
4.830
4.760
4.680
4.740
4.730
4.750
4.000
4.700
4.000
443,417
LAST BOP PRES TEST
5/8/2004
o
H2SlIME
ES
lO.
0.739
2.800
2.250
2.370
1.250
2.250
2.500
2.563
2.000
2.563
DEPTH IN DATE IN I-Q..D-L-B-G-O-R
12,525.0 5/8/2004 1-2-WT -G-D-I-CT - TD
BIT I RUN
WOB
BIT OPERATIONS
RPM I GPM I PRESS I P BIT HRS 1 24Hr DIST I 24Hr ROP I CUM HRS I CUM DEPTH I CUM ROP
OPERATIONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTJON
00:00 03:00 3.00 CEMENT P PUMP INTRM1 PJSM- Cement 7" casing as follows: Pump 10 bbls CW-100 @ 8.3 ppg - Test
lines to 3500 psi - valve on standpipe manifold leaking - repair & retest -
pumped 70 bbls CW-100 @ 8.3 ppg - 4 BPM @ 640 psi - Pumped 20 bbls
Mud Push XL @ 10.5 ppg @ 4BPM @ 630 psi - Dropped btm plug - Mixed &
pumped 53 bbls lead slurry (LiteCrete wi additives) @ 11.0 ppg @ 4.5 BPM @
675 psi - Mixed & pumped 22 bbls tatil slurry ( Class G wI additives) @ 15.8
ppg @ 4.5 BPM @ 560 psi - Dropped top plug wi 20 bbls water fl Dowell -
Switch over to rig pumps & displaced cement wi 452 bbls 9.8 ppg @ 5 BPM @
500 top 660 psi - Bumped plug wI 1100 psi - Floats held - CIP @ 0251 hrs. -
Full returns through out job
03:00 04:00 1.00 CEMENT P OTHR INTRM1 RU & test 7" casing to 3500 psi for 30 mins.
04:00 04:30 0.50 CEMENT P RURD INTRM1 RD cement lines & head - LD landing jt. & casing elevators
04:30 05:30 1.00 DRILL P OTHR INTRM1 Pull thin wall wear bushing - Install pack off & test to 5000 psi
05:30 06:30 1.00 WELCTL P EQRP INTRM1 Change top pipe rams fn" to 3 1 12" X 6" VBR
Printed: 10/1/2004 11 :54:49 AM
Page 2 of 2
CD1-08
ConocoPhillipsAlaska, Inc.
Daily Drilling Report
I. JOB NUMBER I EVENT CODE 124 HRS PROG 'I TMD I TVD
! ODR ! 12,525.0 I 6,928.0
I DFS I REPT NO.
11 .00 I 12
¡DATE
! 5í8/2004
WELL NAME
FROM TO
06:30 12:00
HOURS
5.50
CODE TROUBLE1 SUB
WELCTL ~ BOPE
OPERATIONS SUMMARY
PHASE DESCRIPTION
INTRM1 RU to test BOPE - PJSM - Test BOPE to 250 psi & 5000 psi - Hydril to 250 &
3500 - repaired manual valve on kill line & retest - Test witnessed & approved
by Chuck Scheve AOGCC - RD ( PU drilling bails & DP elevators while
repairing valve)
Blew down, pulled test plug, set wear ring, C/O saver sub.
UD 5" HWDP in mouse hole. M/U 6-1/8" BHA.
Singled in hole from 375' to 4385', filled pipe @ 2000' intervals.
TIH from derrick 4385' to 8700'.
12:00 13:30 1.50 DRILL P RIRD INTRM1
13:30 16:30 3.00 DRILL P PULD INTRM1
16:30 20:30 : 4.00 DRILL P TRIP I NTRM 1
20:30 00:00 ! 3.50 DRILL P ITRIP INTRM1
24 HR SUMMARY: Cement & 7" casing - Test casing to 3500 psi - set & test pack off - RU & test BOPE - MU 6 1/8" BHA. Singled in hole from
375' to 4385', then TIH from derrick to 8700'.
COMPANY
ConocoPhillips Company
Fairweather E&P Service
Doyon Drilling Inc
Dowell
Halliburton - Sperry-Sun
Halliburton - Sperry-Sun
SERVICE
PERSONNEL DATA
NO. I HOURS COMPANY
1 ! M-I Drilling Fluids
1 Swaco
25 Arctic Catering Inc.
2 I Quadco I Totco
2 I ASRC Energy Services (
2 I Epoch Well Services Inc
SERVICE
NO. I HOURS
3
4
5
1 I
2
2
ITEM
UNITS
gals
bbls
USAGE
2,029
870
MATERIALS/CONSUMPTION
ON HAND ITEM
17,915 Water, Potable
-5,840
UNITS
bbls
USAGE
ON HAND
-720
Fuel
Water, Drilling
RESERVOIRNAME
CD1-7
CD1-08
RESERVOIRANDJNTERVALDA TA
~~~;~VitY T e:~NE I T~~:~ ŠÁS;~I: ~~~
COMMENTS
Printed: 10/1/2004 11 :54:49 AM
Hole Size: 8-1/2" I'" Casing Shoe Depth I
RKB-CHF: 34.71Ft 3,408 1Ft-MOl 2,3431 Ft-TVD
CasinQ Size and Description: 19-5/8" 36#/Ft J-55 BTC
ChanQes for Annular AdeQuacv Test
Juter casing shoe test results in comments
Description references outer casing string.
>ize is that drilled below outer casing.
;timated TOC for Hole Depth.
Enter inner casing 00 at right
Well Name:
Drilling Supervisor:
Ri9:
Mickey I Kuenzler
CD1-08
Type of Test: Annulus Leak Off Test for Disposal Adequacy
PRESSURE INTEGRITY TEST
CONOCOPHILLIPS Alaska, Inc.
Doyon 19 Date: 5/8/2004
I Pump used: I Cement Unit I ~
... Pumping down annulus. ...
Hole Depth
10,215IFt-MD I 6,0661Ft-TVD
1...1
Pressure InteqritvTest
Mud Weight: 9.8 ppg
Inner casing 00: 7.0 In.
Desired PIT EMW:
Estimates for Test:
15.5 ppg
694 psi
0.7 bbls
1"'1
1...1
EMW = Leak-off Pressure + Mud Weight = 668 9 8
0.052 x TVD 0.052 x 2343 + .
EMW at 3408 Ft-MD (2343 Ft-TVD) = 15.3
1000·
w
a:
::::)
(J) 500 .
(J)
w
a:
a..
o
o
5 10
15
Barrels
20
---LEAK-OFF TEST
.....CASING TEST
Comments:
9 5/8 LOT = 16.2 PPG EMW
PIT 15 Second
Shut-in Pressure, psi
569
~
25
30
35
o
5 10 15 20 25
Shut-In time, Minutes
o PIT Point
I Volume Input
Pump Rate:
0.5 Bbl/min
"Y
Barrels ...
Bbls/Strk ...
30
Casin~ Test Pressure Integrity Test
Pumping Shut-in Pumping Shut-in
Bbls psi Min psi Bbls psi Min psi
0.5 54 0 622
1 67 0.25 569
1.5 79 0.5 562
2 96 1 ,~44
( -
2.5 120 1.5
3 153 2 522
3.5 185 2.5 519
4 227 3 516
4.5 252 3.5 510
5 275 4 508
5.5 310 4.5 503
6 337 5 502
6.5 375 5.5 499
7 413 6 497
7.5 440 6.5 496
8 476 7 492
8.5 504 7.5 490
9 544 8 488
9.5 584 8.5 483
10 618 9 480
10.5 654 9.5 ( --:;g
11 668 10 ,6
11.5 672
12 664
12.5 659
13 646
13.5 645
14 630
14.5 622
Volume Volume Volume Volume
Pumped Bled Back Pumped Bled Back
0.0 tsbls I Esbls 14.5 tsbls Itsbls
· ..".,.....""".,."...".....'".".,.....,..",.,..,......
"'I,
WElL DETAILS
Name +NI-S +E/-W No""",,, Ea....iÐg lalÏlnde Lon¡;iluck SkIt
CDI-œ -50.46 -48.63 5975&55.210 385950.600 70"20'34.4261'1 150"55·32.288W NlA
-1320
--·'1240
---1033
--&27
--620
--413
--'207
-0 270
---207
--413
-620
-827
-1033
-1240
-1320
ANTI-cOLLlSION SETIlNGS
COMP,\NY œr AILS
Interpolation Method:MD
Depth Range From: 3396_00
MaxinIlffi Range:: 2500.00
Conoc:oPhilips AIouIb Inc.
~
~
Interval: 1.00
To: 3416.00
Reference: Principal Plan
CalculoJion Medtod: MirámumC""",_
== ~~¿~North
W~== ~~CuÔl¡
o
1J20
WEUPAm œr AILS
CDI-08
501032048900
Rig: Doyon 19
Rd. DoImn: CDI-08: 55.600
V.Secoon ~ ~ ~::tvo
Angl:
126.lI?2" 0.00 0.00 36.10
From Colour ToJ\.ID
36 300
300 400
400 500
500 750
750 1000
1000 1250
1250 1500
1500 1750
1750 2000
2000 2500
2500 3000
3000 3500
3500 4000
4000 4500
4500 5000
5000 5500
5500 6500
6500 7500
7500 8500
8500 9500
9500 1 ??oo
1 ??oo 10500
10500 11 000
11000 12000
12000 13000
13000 14000
14000 15000
15000 16000
16000 17000
17000 18000
18000 19000
19000 2??oo
90
180 UllI
Travelling Cylinder Azimuth (fFO+AZI) [deg] vs Centre to Centre Separation [ft]
1/4 Mile Radius of
CD1-08 ...9-5/8" Csg Pi
(@ 3406' MD /2342' TVD)
SURFACE CASING S.....')E SEPARATION FROM CD1-08
~.
CD1-08 x y
Surface Casing Shoe ASP 4 Coordinates: 387790.00 5974786.00
~unace ~unace ~unace csg.
Details @ Permit Distance from Shoe csg.Shoe Shoe Y
Wells AOGCC? Permit # Date Object well* rVD X Coord. Coord.
CD1-01 y 399-116 7/12/99 2232 2364 386000.88 5976120.23
CD1-02 1913 2398 386406.59 5976107.32
CD1-03 y 300-005 1/13/00 2742 2370 385744.09 5976611.32
CD1-Q4 2052 2377 386800.96 5976584.44
CD1-05 y 300-022 1/27/00 1667 2387 386752.76 5976091 .39
CD1-06 1374 3090 387261.90 5976054.67
CD1-07 y 304-047 2/19/04 -' 718 2362 387324.34 5975332.78
CD1-08 0 2373 387790.00 5974786.00
CD1-09 y 300-163 6/22/00 1331 2790 387400.42 5976058.56
CD1-10 Y 2104 2403 386080.76 5976013.75
CD1-11
CD1-12
CD1-13 y 399-121 7/19/99 1814 2387 386333.24 5975867.57
CD1-14 "822 2366 388120.50 5975539.11
CD1-15
CD1-16 Y 399-213 11/2/99 1353 2399 386666.50 5975539.37
CD1-17 1598 2385 386386.08 5975549.67
CD1-18
CD1-19 Y 399-064 4/20/99 2635 2393 386182.40 5976873.16
CD1-20
CD1-21 Y 304-009 1/12/04 3235 2391 385033.54 5976479.08
CD1-22 Y 2132 3110 385890.63 5975753.64
CD1-23 y 399-141 8/5/99 - 794 2398 387499.21 5975525.36
CD1-24 J 1123 2390 387001.62 5975585.79
CD1-25 y 300-102 4/17/00 1038 2398 386816.46 5975145.40
CD1-26 1293 2389 386511 .26 5974974.98
CD1-27 Y 300-058 3/22/00 1641 2366 386148.85 5974816.28
CD1-28 Y 2228 2372 385780.25 5975747.82
CD1-229 1786 2385 386239.91 5973899.61
CD1-30 y 3291 2387 384814.85 5976193.13
CD1-31 Y 300-263 11/24/00 2951 2378 385054.61 5975893.22
CD1-32 Y 399-245 12/9/99 3210 2413 384754.69 5975829.24
CD1-33 Y 2174 2430 385796.34 5975652.73
CD1-34 Y 300-133 5/8/00 2326 2361 385543.31 5975386.66
CD1-35 y 399-086 5/21/99 2329 2388 385634.65 5975667.79
CD1-36 Y 399-260 1/3/00 2733 2406 385189.14 5975626.47
CD1-37 y 399-162 8/27/99 1967 2409 385828.32 5974635.64
CD1-38 y 300-051 2/29/00 2289 2376 385516.01 5974522.02
CD1-39 y 399-181 9/10/99 2228 2388 385568.87 5974954.54
CD1-40 y 399-101 6/11/99 2817 2392 385005.59 5974356.58
CD1-41 y 300-1 04 4/24/00 2657 2394 385231.03 5975499.87
CD1-42 y 399-261 1/3/00 3238 2384 384596.37 5975321 .88
CD1-43 Y 300-241 9/20/00 3038 2386 384753.45 5974889.55
CD1-44 Y 300-146 5/31/00 3304 2375 384506.22 5975155.17
CD1-45 Y 299-233 11/17/99 3076 2385 384726.63 5975067.43
CD1-46 1946 2360 385979.18 5974074.56
CD1-47
CD1-48
CD1-49
* Lateral distance in feet, between surface casing shoes, in the X- Y plane, assumes similar TVD
Note that this sheet is not the definitive record
Well Information for CDI-14, CDI-24, and CDI-26
(1320' Radius of CDt-08)
---
..-"
Casing Detail
9 5/8" Surface Casing
_PHILLIPS Alaska, Inc.
A SUbsidiary of PHILLIPS PETROLEUM COMPANY
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN
Jts 3 to 86
Doyon 19 RKB to LDS
FMC Gen V Hanger
84 Jts 9-5/8" 40# L-80 MBTC Csg
Davis Lynch Float Collar
2 Jts 9-5/8" 40# L-80 MBTC Csg
Davis Lynch Float Shoe
Jts 1 to 2
TD 12 1/4" Surface Hole
RUN TOTAL 48 BOWSPRING CENTRALIZERS -
1 per jt on Jt #1 - #12 (On stop rings of Jt #1 & #3)
#14,16,18,20,22,24,26,28,30,32,34,36,38,
40,42,44,46,48,50,52,54,56,58,60,62,64,
66,68,70,72,74,76,78,80,82,84.
Last 4 joints stay out # 87 thru # 90.
Use Best-Q-Life 2000 pipe dope
Remarks: Up Wt -175 k
Dn Wt -135 k
Block Wt - 70
Well: CD1-14
Date: 2/28/2001
LENGTH
36.80
2.21
3463.04
1.60
81.08
1.77
3596.00
SupeNisor: Don Mickey
DEPTH
TOPS
36.80
39.01
3502.05
3503.65
3584.73
3586.50
Well Name:
Rig Name:
Phillips Alaska Drilling
Report Date:
AFC No.:
Casing Size
9 518"
Centralizers
Comments:
Mud
Comments:
Wash 0
Comments:
.. VlsÇosffled wI nut plug
Spacer
Comments:
Lead cement· 0
Comments:
Tall Cement 0
Comments:
Displacement 0
Comments:
Calculated top of cement:
Surface
CD1·14
Doyon 19
Hole Diameter:
12 1/4'
Angle thru KRU:
CP:
Date:03l0112oo1
Time:0930 hrs.
Remarks:FuIl returns through out JOb· 95.5 bbls emt returns to surface
Cement Company:
Dowell
0310112001
998002
Shoe Depth:
3586
Report Number.
Reid:
Cementing Details
I
1
Alpine
LC Depth:
3502
State type used, inter....a/s co~'ered and spacing
48 bow spring' 1 per It for first 12 ¡ts. ,then 1 every other It from '14 to' 64
Weight:
9.9
PV(prior cond):
20
Gels before:
29,72,91
Type:
Water
Gels after:
4,25,32
Type:
ARCO 845
Type:
A5111
Mix wtr temp:
70
Add~i"es:
G wI 30 % 0053, 0.6% 0046, 1.5% 0079, 1.5% 5001, SO% D124, 9% BWOW D44
Weight:
15.8 ppg
Type:
G
Mix wtr temp:
70
Add~i"es:
G wi 0.2% 0046, 0.3% 0065,1% 5001
Rate(before tail at shoe):
8 bblsl mln
Reciprocation length:
20'
Theoretical Displacement:
265.5
Rig Contractor:
DOYON
PV(after cond):
21
Total Volume Circulated:
1080 bbls
Volume:
40 bbls
Volume:
50 bbls
No. of Sacks:
566
No. of Sacks:
237
Rate(tail around shoe):
8 bblsl mln
Reciprocation speed:
Actual Displacement
265.5
Bumped plug:
Yes
YP(prior cond):
36
Weight:
10.7 ppg
Floats held:
Yes
Approved By:
Don Mickey
% washout:
YP(after cond):
16
Weighl:
8.3 ppg
Weight:
10.5 ppg
Yield:
4.44
Yield:
1.17
Str. WI. Up:
175
SIr. WI. Do....n:
135
Str. WI. in mud:
conocoPhHliÞ$~laSkaJilnc.
Daily>Dri.llingdRøpo.rt
I JOB NUMBER I EVENT CODE \24 HRS PROG
CD1-14 RST
I RIG NAME & NO. FIELD NAME lacs NO.
Doyon Drilling Inc 19 ALPINE
ACCIDENTS LAST 24 HRS.?
24 HR FORECAST
CMT CSG, LAY DOWN DRILL PIPE, RUN KILL STRING
LITHOLOGY \ JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF
LAST SURVEY: DATE TMD INC AZIM I LAST CASING
(in) @ (ft)
OPERATIONS SUMMARY
PHASE {)ÊSCRIPTJON
SURFAC Drill 12 1/4" hole fl 3240' tro 3596'
SURFAC Circ & condition mud
SURFAC Wiper trip fl 3596' to 1450' - hole in good condition
SURFAC Circ hole clean - monitor well
SURFAC POOH to run csg - worked through some tight spots fl 1134' to 750'
SURFAC UD BHA
SURFAC Clear rig floor of BHA tools
SURFAC Rig up to run 95/8" csg
SURFAC Held PJSM - Ran Float shoe - 2 jts. 95/8/1 40# L-80 MBTC csg - float collar -
24 jts 9 5/8" 40# L-80 MBTC csg
--
WELL NAME
SUPERVISOR
DON MICKEY
CURRENT STATUS
PREP TO CMT 9 5/8/1 CSG
FROM TO HOURS CODE TROUBLE SUB
00:00 09:00 9.00 DRILL P DRLG
09:00 10:30 1.50 DRILL P CIRC
10:30 13:00 2.50 DRILL P WIPR
13:00 15:30 2.50 DRILL P CIRC
15:30 18:00 2.50 DRILL P TRIP
18:00 19:30 1.50 DRILL P PULD
19:30 20:00 0.50 DRILL P PULD
20:00 21:30 1.50 CASE P RURD
21:30 00:00 2.50 CASE P RUNC
XT CASING:,EST COST TO DATE:750000
0___'
TVD I DFS
3,596.0 2,370.0
AUTH MD IDAlLYTAN~
DAILY INT WIO MUD
o
\ REPT NO. I DATE
4 2/28/2001
CUM. TANGO
CUM INT ANG WI MUD
o
TMD
DATE OF LAST SAFETY MEETING DAILY TOTAL
CUM COST WI MUD
96,635
206,178
AFE
AUTH.
998D02
\ NEXT CASING
(in) @
(ft)
LAST BOP PRES TEST
2/26/2001
COMMENTS
Printed: 10/4/2004 3:24:18 PM
I LAST CASING I NEXT CASING
(in) @ (ft) i (in) @
OPERATIONS SUMMARY
PHASE DESCRIPTION
SURFAC¡ Continue running 95/8" 40# L-BO csg - ran 86 jts. total landed on mandrel wI
float shoe @ 3586' float collar @ 3502'
SURFAC Circ and condition for cmt job
SURFAC Rig down fill up tool - Rig up cmt head
SURFAC Held PJSM
SURFAC Cement 9 5/8" csg - pumped 40 bbls. Vis water wlnut plug - test lines to 2500
psi - drop btm plug - pump 50 bbls Arco spacer @ 10.5 ppg - mix and pumped
448 bbls 10.7 ppg lead slurry and 49.5 bbls 15.8 ppg tail slurry -( Note had
wash out on cmt line in mud pits wI 365 bbls lead pumped - shut down and
changed lines - resume pumping no problems - ObseNed nut plug @ 440 bbls
lead pumped) drop top plug wi 20 bbls water fl Dowell - switch to rig pumps
and displace wi mud 245 bbls - bumped plug - floats held - CIP @ 0930hrs. 95
bbls cmt returns to surface
SURFAC Rig down cmt head - landing jt. . wash out riser and 20" diverter
SURFAC Lay down 32 stds. 5" DP - 9 stds. HWDP - 40 stds 3 1/2" OP from derrick
I SURFAC Nipple down diverter, riser, flow line
I SURFAC Install FMC Unihead
ConocoPhillips Alaska, Inc.
Daily DrUlingReport
I JOB NUMBER I EVENT CODE \24 HRS PROG TMD I TVD 'I DFS
I RST 3,596.0 I 2,370.0
I FIELD NAME I OCS NO. AUTH MD I DAILY TANG
! ALPINE ! 0
ACCIDENTS LAST 24 HRS. ? DAILY INT WIO MUD
TESTING 95/8" CSG 0
24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL
FREEZE PROTECT WELL & RELEASE RIG 1 209,121
I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE
I i I
INC AZIM
WELL NAME
CD1-1
RIG NAME & NO.
Doyon Drilling Inc 19
SUPERVISOR
DON MICKEY
CURRENT STATUS
LITHOLOGY
998D02
LAST SURVEY: DATE
TMD
FROM TO HOURS CODE TROUBLE SUB
00:00 03:00 3.00 CASE P RUNC
03:00 06:00 3.00 CASE P CIRC
06:00 06:30 0.50 CEMENT P PUMP
06:30 07:00 0.50 CEMENT P¡ SFTY
I
07:00 09:30 2.50 CEMENT P PUMP
09:30 12:00
12:00 21 :30
21 :30 23:30
23:30 00:00
i
I
CEMENT P
DRILL P
I W ELCTL P¡
, I
! WELCTL P¡
PULD
PULD
NUND
NUND
2.50
9.50
2.00
0.50
COMMENTS
CASING:, EST COST TO DATE: 1 000000
Page 1 of 1
I REPT NO. I DATE
I 5 I 3/1/2001
I
(UM. TANG
I 0
CUM INT ANG WI MUD
o
CUM COST WI MUD
415,299
AUTH.
(ft)
LAST BOP PRES TEST
2/26/2001
Printed: 10/4/2004 3:25:03 PM
CASING TEST and FORMATION INTEGRITY TEST
Well Name:
4/3/2001
CD1-14
Date:
Supervisor: Don Mickey
Reason(s) for test:
o Initial Casing Shoe Test
o Formation Adequacy for Annular Injection
o Deep Test: Open Hole Adequacy for Higher Mud Weight
Casing Size and Description: 9 5/8" 40# L-80
Casing Setting Depth: 3,586' TM D Hole Depth: 3,616' TMD
2,365' TVD 2,377' TVD
Mud Weight: 9.6 ppg Length of Open Hole Section: 30'
EMW= Leak-off Press. + Mud Weight = 790 psi + 9.6 ppg
0.052 x TVD 0.052 x 2,365'
Used cement unit
RiQ pump used
NO
#1
Pump output = 0.0838 bps
EMW for open hole section = 16.0 ppg
2,800 psi
2,700 psi
2,600 psi
2,500 psi
2,400 psi
2,300 psi
2,200 psi
2,100 psi
2,000 psi
1,900 psi
, ,800 psi
W 1,700 psi
a: , ,600 psi
::) 1,500 psi
m 1,400 psi
W , ,300 psi
a: 1,200 psi
Q. 1,100 psi
1,000 psi
900 psi
800 psi
700 psi
600 psi
500 psi
400 psi
300 psi
200 psi
100 psi
Opsin
o
Fluid Pumped = 1.2 bbls
Fluid Bled Back = 0.5 bbls
11111111~!11111111 IIIIIIII1
. ~..~--
\TIME LINE I
ONE MINUTE T1CìS
--- LEAK-OFF TEST
.....CASING TEST
-It- LOT SHUT IN TIME
-.- CASING TEST SHUT IN TIME =
~TIME LINE
IIIIII 1IIIIIII1
,·v
~//'_.'~'
--
20
30
STROKES
10
40
50
NOTE: STROKES TURN TO MINUTES DURING "SHUT IN TIME":see time line above
Modified by Scott Reynolds
LEAK-OFF DATA
60
MINUTES
FOR
LOT STROKES PRESSURE
,.- ~----,---------" - .... t
~-------------~------Q.------.i---~-p~l~----¡
L___________L___ 1~!» __ ! __~_P_!!!__J
I '2 0 I 70 . I
L-_____________L_____:_______+________P..!!!___-l
~- - - ---1------ª:!!----!---..!!!Q...P~!---!
~- ------------~----~:!!---_1----!~Q...P~~---¡
L______________L_____~:!!____l___~1Q...P_~!__J
L--------------1------~:!!-----l---~!!Q...P-~!-__1
~---------------!------?:!!-----t---~!.:Q...P-!!!---!
~---------------¡-----~:-º-----~----~!!Q...P-!!~---¡
L______________L_____~:!!_____l___~~º_..P_~!__.l
L-------------.L----~-º.:~----l---~~Q...P-~!-J
~---------------~-----~-!.:~----t---~!Q...P~L--!
~---------------i-----~-~.:~----~---?~Q...P-!!!---¡
L______________L____~_~.:~____l__.?!º_..P_~LJ
L--------------L--- 14.0 l__.?~º_..P_~!_.J
I : I
I I I I
,..---------------,---------------,..--------------_."
I : I
~--------------1----------------I-----------------f
I ::
.._______________..i______________........_______________.&
I ' I I
I----------------l---------------~----------------:
I I I I
I I :
,.---------------,---------------,..----------------,
I , I I
~---------------i---------------_I-----------------i
L_______________l_______________l_______________.l
I I I I
~---------------i...·..........·..·......·......t............·....···............·i
I I I ,
~-~~-I!!-~!!~~-¡---------------~~-~-~~!-!:t!~~-l!!:t,E
L-g~Q-~!~---L--------------l---?-~Q-(?-~L--i
t---!~Q.!!.!~-.J---------------l---~~Q...P-~!---:
..---~~Q-~!~---!--------------~---~~º-..P:!L-I
~---~~Q-~~~--+-------------+---~!!Q...P-!!~---i
L__~~Q_~!~___.._______________.L__~!º_..P_!!!___i
50 . I I 560 . ,
.----~---~l~---~---------------.L--------..P-!!!---i
~---~~Q-~!~---J---------------~---~~Q...P-~!---i
~--X~Q-~~~--~---------------~----~~Q...P-~~---¡
L___~~Q_~!~___L______________J.___~~º_..P_~!__.i
L--~~Q-~!~---L------------- j _5~0 -P_~Lj
L_!Q~9__r.n!~__L______________l___~~Q...P_!!!.j
~PHILLIPS Alaska, Inc.
~ A Swsldiary of PHILLIPS PETROLEl.M COMPANY
CASING TEST DATA
MINUTES
FOR
CSGTEST STROKES PRESSURE
,..-- - ---T--- ----r----------,
: I 0 stks I 0 psi I
----------------+-----------+-------------+
L______________L__ 2 s~'5..~___L__}.!U~!!..._.J
L--------------L 4 st~~.J----~º-.P-..~!--J
~--------------i_--!!-!ì!ks --_i----?-º-.P-~--__!
t::=~~:I:t
L______________L--!~-~~-~~--L--~!º-p.~J.--J
~--------------J---!~-~!~!-J---~~º.P.!L__!
~---------------¡--!~-~!~!--¡---!!~º-p.!~--~
L______________L__!!_~!~!__L__~~º-psi !
L______________L-_ª~_!!!~!__L-~-'-º!!º-..P~!-~
~--------------_!---ª~-!!~!-4--~-'-!~º-..P:!L~
~---------------t--~~-~~¡--t--~~~~..P~;-~
t----------------..---------------1----------..P----J
L______________L__ª!_!!~!j--~-'-~~º-..P.!!j
~---------------i--~º--!!~!--!--~-'-~!º-..P~!-~
~---------------¡--~~-!!~!--¡--~-'-~!º-..P:!~-1
L______________L_~~_~!~!__L~_'_!~~..P~!_...
L--------------L-~~-~!~~--L-~-'-~~º-J?:!!.J
i ¡ 38 stks ! 2,510 psi i
~-~~~-'!'!!~~~-¡---------------~~~1~!'-':!~!~~-':!~
L_Q~Q._'!!!~___L_____________J__g!.~JQ_(?_~~.J
L-_!~Q._'!!!~__L--------------L-~-'~~º-..P:!!.J
~--~:9..-~~~---i_-------------_i--~-~~~J?~!( .
~--~~Q.-r.n~~---¡---------------¡--~-'-~!Q...P.!~~.
~--~~Q.-r.n!~---L--------------L-~-'-~!Q...P~!-~
L__~~Q._r.n!~_j--_____________L-;_~!º_..P~!..:
~--§~Q.-'!!l~--_!---------------!--~-'~!Q...P~!-~
~- 7:.Q.-~in-- ¡---------------¡--~-'-~!Q.J?.!!-1
L__~~Q._r.n!~__J______________J__~_'_~!Q...P~!_J
L_~~Q._~l~___L-------------J--?-'-~Zº-..P-!!!.J
~--!Q:.9--~~~--¡---------------!--?-'-~!.:Q.J?:!!.~
~--!~:.9--~~~--¡---------------¡--;-~!.:Q...P~!-~
I. 2q.O mi~_j_______________L_;-460 1?~!_j
L--~~:.º--~~~-j---------------l--?-'~~Q...P~!.J
L__~Q:.º__~~~_J______________.l__?_'~~Q...P~!_l
NOTE: TO CLEAR DATA, HIGHLIGHT AND PRESS THE DELETE KEY
œPHILLlPS Alaska, Inc.
~ A Subsidiary of PHILLIPS PETROLEUM COMPANY
Casing Detail
711 Intermediate Casin_q
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN
Doyon 19 RKB to LDS
FMC 11" X 7" Hanger
Jts 3 to 343 341 Jts T' 26# L-80 BTCM Csg
1" Davis Lynch Float Collar
Jts 1 to 2 2 Jts T' 26# L-80 BTCM Csg
7" Davis Lynch Float Shoe
TO 8 1/2" hole 14090'
1 S8 centralizer per jt #1 - #20
1 S8 centralizer every other jt #257- #341
Total· 63 centralizers
Use Best-a-Life 2000 pipe dope
Remarks: Up Wt -425+k
On Wt - 75k
Well: CD1-14
Date: 4/24/2001
LENGTH
34.33
1.30
13952.85
1.53
81.35
1.70
Supervisor: Oavid P. Burley
DEPTH
TOPS
34.33
35.63
13988.48
13990.01
14071.36
14073.06
Well Name:
Rig Name:
Phillips Alask2r-ùrilling
Report Date:
AFC No.:
Casing Size
7"
Centralizers
Comments:
Mud
Comments:
Wash 0
Comments:
Spacer 0
Comments:
lead Cement 0
Comments:
Tall Cement 0
Comments:
Displacement 0
Comments:
Calculated top of cement:
12846' W/40% EXCESS
CD1-14
Doyon 19
Hole Diameter.
8.5+
Angle thru KRU:
.--.-/
Cementing Details
I
0412412001
998D02
Report Number:
Reid:
31
Alpine
Shoe Depth:
14073'
LC Depth:
13988'
% washout:
State type used, intervals covered and spacing
Weight:
10.2
PV(prior con d):
10
Ran 8-318" x 7· stalght bailie posftve stand off centralizers 1 per Joint on 11-20, every other Joint #257 - 341' (63
Total).
YP(after cond):
17
Gels before:
618111
Type:
ARCO Wash
Gels after:
618111
PV(after cond):
10
YP(prior cond):
17
Type:
ARCO 845
Type:
Mix wtr temp:
Total Volume Circulated:
1785 bbls
Volume:
20
Weight:
8.4
Additives:
Type:
G
Mix wtr temp:
70
Volume:
50
Weight:
12.5
No. of Sacks:
Weight:
Yield:
No. of Sacks:
235
Weight:
15.8
Yield:
1.15
Rate(before tail at shoe):
7.1
Additives:
0.2% DOO, 0.25% D065, 0.25% D800, 0.18% D167.
Str. Wt. Up:
475+
Reciprocation length:
o
Theoretical Displacement:
535.5
CP:
Date:4-25-01
Time:0908 hrs
Rate(tail around shoe):
7.1
Reciprocation speed:
o
Str. Wt. Down:
75
Actual Displacement:
537
Str. Wt. in mud:
Bumped plug:
NO
Floats held:
YES
Remarks:Pushed casing last 4 Joints to bottom. Staged up pumps to 6 bpm over first 250 bbls pumped, encountered 1 bpm losses at 6 bpm.
Reduced rate to 5 bpm with full returns and pumped 40 bbl pill with 4.0 ppb of MI Fine lCM. Circulated and conditioned mud, staged pumps up to
8.0 bpm after 20 bbls of pill around shoe with full returns. Had loss of pump pressure last 8 bbls of displacement, pumped 1.5 bbls over calculated
displacement, did not bump plug. Observed annulus, standing full to flowline.
Cement Company:
Dowell
Rig Contractor:
DOYON
Approved By:
David P. Burley
WELL NAME
Page 1 of 1
Co no co Phillips Alaska, Inc.
Daily Drilling ·Report
CD 1-14
I RIG NAME & NO.
! Doyon Drilling Inc 19
I JOB NUMBER i EVENT CODE 124 HRS PROG
, I RST I
I FIELD NAME lacs NO.
i ALPINE
ACCIDENTS LAST 24 HRS.?
SUPERVISOR
DON MICKEY
CURRENT STATUS
MIU 6 1/8" BIT & 7" CSG SCRAPER ASSEMBLY
24 HR FORECAST
RIH WI 7" CSG SCRAPER - PICKING UP 3 1/2" DRILL PIPE
LITHOLOGY I JAR HRS OF SERVICE I BHA HRS SINCE INSP
! ,
: I
LAST SURVEY: DATE TMD
FROM TO
00:00 02:00
HOURS
2.00
CODE
CASE P
02:00 07:00 5.00 CASE P
07:00 09:30 2.50 CEMENT P
i
!
!
!
09:30 10:30 1.00 CEMENT R.
10:30 12:00 1.50 WELCTL R
I
12:00 13:00 1.00 DRILL P i
13:00 I 13:30 0.50 RIGMNT pi
13:30 i 00:00 10.50 DRILL P i
i
INC AZIM
TROUBLE SUB
'RUNC
CIRC
PUMP
PULD
¡NUND
PULD
RSRV
PULD
TMD 'I TVD ! DFS
141090.0 61855.0!
AUTH MD I DAILY TANG
I 0
DAILY INT WIO MUD
o
DATE OF LAST SAFETY MEETING DAILY TOTAL
141,851
I REPT NO. I DATE
32 4/25/2001
¡CUM. TANG
I 0
CUM INTANG WI MUD
o
CUM COST WI MUD
3,898,462
I LEAKOFF
AFE
AUTH.
998D02
I LAST CASING
¡ (in) @ (ft)
OPERATIONS SUMMARY
PHASE
INTRM1
'I' NEXT CASING
(in) @
(ft)
LAST BOP PRES TEST
4/17/2001
INTRM1
DESCRIPTION
Continue running 7" csg to 14,073' . FC @ 13,988' (343 jts) had to push last 4
jts. to btm.
I Staged pumps up to 6 bpm - hole taking fluid @ 1 bpm - slowed pumps to 5
'bpm wi full returns - pumped 40 bbls LCM pill - staged pumps up to 8 bpm wi
20 bbls pill out shoe had full returns @ 8 bpm
PJSM - Cement 7" csg wi 48 bbls slurry @ 15.8 ppg - Displaced wI 30 bbls
fresh water & 507 bbls 10.2 ppg mud 1.5 bbls over calc. displacement - didn't
bump plug - floats held - CIP @ 09:08 hrs.- lost pump pressure last 8 bbls of
displacement - observed annulus standing full @ flow line
Tear out cmt head & lay down landing jt.
Pull wear bushing - install 7" pack-off & test to 5000 psi - install wear bushing
PJSM - Lay down 8 1/2" BHA
Service pipe skate
Lay down 5" drill pipe
INTRM1
INTRM1
INTRM1
INTRM1
INTRM1
INTRM1
COMMENTS
XT CASING:4 1/2" COMPLETION,EST COST TO DATE:3000000
Printed: 10/4/2004 3:25:29 PM
CASING TEST and FORMATION INTEGRITY TEST
Well Name:
Date: 4/26/2001
Supervisor: D.Mickey
CD1-14
o Initial Casing Shoe Test
o Formation Adequacy for Annular Injection
o Deep Test: Open Hole Adequacy for Higher Mud Weight
Casing Size and Description: 95/8" 40# L-80 BTMC X 7" 26# L-80 BTMC
Reason(s) for test:
TOC
Casing Setting Depth: 3,586' TMD Hole Depth: 12846
2,365' TVD 6,436' TVD
Mud Weight: 10.2 ppg Length of Open Hole Section: 9,260'
EMW= Leak-off Press. + Mud Weight = 601 psi + 10.2 ppg
0.052 x TVD 0.052 x 2,365'
EMW for open hole section = 15.1 ppg
Used cement unit
RiQ pump used
Pump output = bbls pumped
Fluid Pumped = 19.0 bbls
Fluid Bled Back = 0.0 bbls
yes
#2
800 psi
700 psi
I IIIIIIII1
IIIIIIII~IIIIIIII
\TIME LINE I
ONE MINUTE TIC,S
--- LEAK-OFF TEST
......CASING TEST
-e- LOT SHUT IN TIME
-.- CASING TEST SHUT IN TIME
-+- TIME LINE
600 psi
-I
\.
I'II..'III--'Hill--tll-.......
500 psi
w
a:
::>
~ 400 psi
W
a:
0.
300 psi /
200 psi 7
t
100 psi
o psi ~ Å
o
30
BARRELS
40
50
10
20
NOTE: STROKES TURN TO MINUTES DURING liS HUT IN TIMEII:see time line above
Modified by Scott Reynolds
.PHlllIPS Alaska, Inc.
~ A Slbsidiary 0( PHILLIPS PETROLELM COMPANY
LEAK-OFF DATA
CASING TEST DATA
60
MINUTES MINUTES
FOR FOR
LOT BBLS PRESSURE CSG TEST STROKES PRESSURE
.-------------,,-------------.,-----. r--n -: 0 stks : ---õ-p-šf--¡
~--------------~------.!.--_i_ 0 p'~i . - i !- - - -i --i- !
L____.________J______~:_º____l_!~..P.!!__J :--------------t-------------t----------"1
L____________j_____2::..C!____l_!~.l?_~!_..i ~-------------t--------------t------------~
:..______________-:,1- _3.Q___.,..i __1..~'p_!!!___.i : : : :
; i -¡ -,
~---------------~----- 4·C!____~---1..!!ª-.l?-~~--i ~ -- ------t--------------t--------------i.
L______________L_____~.:_º_____l___~~..?.l?.!!__J~---------------f---------------f---------------{
L______________L___~:_º_____l---~~.l?.!!-.J r------------t------------i------------i
L---------------!-----.?:-º-----.!_---~~~.l?-~!---!._---------------T---------------T----------------..
~--------.------~------~:-º-----~----~~.l?-~~---i ~...-_-_-_-_-_-_._-_-_-_-_-_-_-_-.f..: -.-_-_-_-_-_-_-_-_-_-_-_-_-_-_+..: -_-_-.-.-.-_-_--__-_-_-_-_-_-_1..&~
L______________L____~:_º_____l__~~8 .l?_~!__J
L______________L___~_º.:!L___L--~!~.l?~!---!~---------------~---------------~----------------~
: ! 11.0 ! 369 'psi : · , · ,
1----------------1-----1-2-Õ----.,..---399 ---:---. ¡----------------t---------------t----------------,
~---------------+--------.:------~---------.l?-~!---i ~.--------------+-.---.---------+-----------------i
13 0 439 nSI ;:-. _______________..;: _______________1·: ________________..&':
L_______________l________.:______l________J:'__~__J
L______________L____~_~.:!!___J---~~~.l?-~LJ r---------------t---------------t----------------i
~---------------!-----~-~~º----.i_---~~~.l?-~!---! I I I I
! 15.5 505 nSI [, ___-_-_--_-__-_-_-_-_--__-_-_1,_-_-_-_-_--_-__-_-_--__--__-_-:,:--------------------------_-_-_-'.
~---------------~---------------~---------J:'--~---t r T T -i
L______________L___~_~.:9..____L__~l?..l?_~!___lL______________L______________L______________J
L______________L____~_~.:~____l---~!º-.l?-~!-__1L--------------1.--------------1----------------1
; ! 17.0 I 545 psi ¡ ; I' ! ;
r--------------T----rfš----t---Š7Õ---Šf--~ ~
~---------------..---------------i---------.l?--':---i~-~!:I-'!!J~!~~~-¡--------------~~~1!4-!.F:!~~~-F:!F
L______________L___~_~.:9..____L__~_º~_.l?_~!__JL__º:.9__~~~___L______________L____Q_t>_~~____J
L______________L.......~.~~.~.........L....~º.tp.~.!......JL--!:.9--~!~---1.--------------L-------------j
i i 19.0 ! 601 psi ! i 2:0 m!~___!---------------!---------------/
~_~!:I-':!!-~f-!I.J~~-~---------------~!I-':!!-~~!~~~-l!~,E ~--~:.9.-~~~---t---------------¡--------------1,
L_g:.9.._rJ]!~___l_______________l___§.Q_!_t>_~~__J L__.:!:.9__~!~__L_____________J________________j
L__!:.9.._rJ]i~___l---------------l---~~º-.l?-~!-j L-§:.9--~!~--.i--------------j---------- - I
t---~:.9..-rJ]i~---~---------------.!----~~?.l?.!L-! ~--~:.9 '!1in·f_ -- - -! -------------~
~---~:.9..-rJ]~~---i--------------~----~~?..l?-~~---t ~ 7 ~9 ~t~---t---------------t: ---------------~
~--~~-rJ]~~---~---------------~---~~~.l?-~~---t ~--~:.~-~~~---f---------------,----------------~
~---6:.Õ-rJ]~~--+--------------+---Š35.l?-~~---t ~-10-Õ-~~~---t---------------t----------------~
~----:.---rJ]!~---r--------------.;..--------.l?-~!---¡~-----:..--.!!!!!.:'--f---------------¡----------------i
~---~:.9..-rJ]~~---l---------------~---~!º-.l?-~~---i ~--l?:..º-.!!!~--t---------------t----------------i
~---~:.9..-rJ]!~---..---------------l---~!º-.l?-~!--J L~Q:..º-.!!!~']--l---------------t---------------..&
L___~:.9.._~i~__~---------------l---~!º-.l?.!Lj L-~?:..º-.!!!~']--l---------------l---------------__t
L__!_º:.9__~!~__L______________L__~~?.l?.!!_.J L_~Q:..º_.!!!~']__!______________j_______________J
NOTE: TO CLEAR DATA, HIGHLIGHT AND PRESS THE DELETE KEY
Casing Detail
9.625" Surface Casinp
ARca Alaska, Inc.
# ITEMS
Subsidiary of Atlantic Richfield Company
27 Jts
44 Jts
2 Jts
COMPLETE DESCRIPTION OF EQUIPMENT RUN
Landing jt. 46.50
Doyon 19 RKB to landing ring = 36.58'
FMC Gen V mandrel Hgr
9 5/8", 36#, J-55 BTC Jt#47 - Jt #73
9 5/8" TAM port collar
95/8" 36# J-55 BTC csg Jt #3 & Jt #46
95/8" Davis Lynch Float Collar
95/8" 36# J-55 BTC csg Jt #1 & Jt #2
9 5/8" Davis Lynch Float Shoe
TD»>
Rathole»>
43 Gemeco Bow Spring CENTRALIZERS
Run centralizers in center of Jts. 1,2, over stop collars
and over casinq collars on Jts. 3-12 and over collars of
every 2nd jt to surface.
1 straight blade centralizer on Jt#46 and Jt#47
WELL:
DATE:
1 OF 1
LENGTH
36.58
2.43
1009.34
2.93
1680.16
1.55
85.72
1.76
CD1-24
4/23/1999
PAGES
DEPTH
TOPS
36.58
39.01
1048.35
1051.28
2731.44
2732.99
2818.71
2820.47
2831.00
10.53
Remarks: MADE CSG UP WITH 9000 FT/LB TORQUE AND USE API MOD THREAD COMPOUND,.
. Doyon 19
Drilling Supervisor: Donald Lutrick
'''-'''
~...
~~ ARCO Alaska, Inc.
I
Well Name: CD1-24
Rig Name: Doyon 19
------
Cementing Details
I
Casing Size
9518"
Angle thru KRU:
51 deg at shoe
Report Date: 04126/99
AFC No.: 998805
% washout:
Hole Diameter:
121/4"
Centralizers
Comments:
Report Number: 6
Field:
Shoe Depth:
2821
LC Depth:
2731
State type used, intervals covered and spacing
1 bowspring per It 1st 13 Its. Every other it to surface. Total- 43.1 straight blade centralzer on each side of the port collar.
Mud
Comments:
Weight:
9.6
PV(prior cond):
24
Gels before:
36/72
Gels after:
10/18
Wash 0
Comments:
Type:
FW
Spacer 0
Comments:
Type:
ARCO Spacer
LeadCément 0
Comments:
Type:
AS III LW
Mix wtr temp:
70
Additives:
G+30%0053+<J.6%0046+ 1.5%0079+1.5%8001+50%0124+9%0044
Weight:
15.8
CP:
Date:4/25/99
Time:03:30
Aemarks:Had full returns throughout entire job. Small amount of thin mud at surface when bump plug. RIH and open port collar. Pump 5 bbls mud wi no
circulation. POH. AIH w/1" to TOC at 443'. Circ out cement. Pump 133 bbls AS III LW (10.7) cement to fill annulus.
Tall Cément 0
Comments:
Type:
G
Mix wtr temp:
70
Additives:
G+0.2%D046+<J.3%D065+ 1 %5001
Displacement 0
Comments:
Rate(before tail at shoe):
10
Reciprocation length:
20
Theoretical Displacement:
211
Calculated top of cement:
I Cement Company:
DS
I Rig Contractor:
DOYON
PV(after con d):
26
YP(prior cond):
36
YP(after cond):
34
Total Volume Circulated:
1200
Volume:
100
Weight:
8.3
Volume:
50
Weight:
10.5
No. of Sacks:
500
Weight:
10.7
Yield:
4.44
No. of Sacks:
230
Yield:
1.17
Rate(tail around shoe):
10
Str. WI. Up:
155
Str. Wt. Down:
120
Reciprocation speed:
10fpm
Actual Displacement:
214
Str. Wt. in mud:
Bumped plug:
yes
Floats held:
yes
APproved By:
Donald Lutrick
WELL NAME
CD 1-24
Page 1 of 1
ConocoPhillips Alaska, Inc.
Daily Drilling Report
i RIG NAME & NO.
! Doyon Drilling Inc 19
IJOB NUMBER EVENT CODE 124 HRS PROG
I I ODR !
I FIELD NAME I OCS NO.
! ALPINE
ACCIDENTS LAST 24 HRS.?
TMD TVD 'DFS
2,831.0 I 2,396.0
AUTH MD ! DAILY TANG
! 0
DAILY INT WIO MUD
o
I REPT NO. I DATE
! 5 14/25/1999
CUM. TANG
i 0
CUM INT ANG WI MUD
o
CUM COST WI MUD
566,764
SUPERVISOR
DONALD LUTRICK
CURRENT STATUS
MU BHA
24 HR FORECAST
DATE OF LAST SAFETY MEETING DAIL Y TOTAL
110,156
LITHOLOGY
! JAR HRS OF SERVICE I BHA HRS SINCE INSP .\1 LEAKOFF
I i
INC AZIM
LAST BOP PRES TEST
4/21/1999
LAST SURVEY: DATE TMD
FROM TO HOURS CODE TROUBLE SUB
00:00 01 :00 1.00 P CIRC
01:00 04:00 3.00 CEMENT PLUG
04:00 05:00 1.00 P
05:00 06:00 1.00 P
06:00 07:30 1.50 P
07:30 08:30 1.00 P
08:30 12:00 3.50 Np
12:00 14:30 2.tiO P
14:30 16:00 1.50 P
16:00 19:00 3.00 CEMENT P
19:00 21:30 2.50 Ip
21:30 23:00 1.50 jp
23:00 I 00:00 1.00 I W ELCTL P¡
TRIP
TRIP
CIRC
PLUG
NUND
NUND
¡BOPE
AFE
AUTH.
998B05
I LAST CASING I' NEXT CASING
I (in) @ (ft), (in) @
OPERATIONS SUMMARY
PHASE DESCRIPTION
SURFAC Circ and condtion mud. 10 bpm at 1050 psi. Pumped celloflake as fluid
cailper. Celloflake to surface at 50 bbls over guage hole.
SURFAC Prejob safety meeting on cementing. Tested lines to 2500 psi. Pumped 100
'bbls FW, 50 bbls 10.5 spacer, 395 bbls 10.5 lead (500 sX), 49 bbls 15.8 tail
(230 sX), 20 bbls h20. Dispalce with mud with rig pumps. Bumped plug. Full
returns throughout job. No cement to surface.
SURFAC: RD csg equipment. RU to run DP.
SURFAC RIH wi port collar tool. Latch and open tool.
SURFAC Pump 5 bbls at 2 bpm at 500 psi. No returns. Close port collar. Drop and
shear ball. RD.
SURFAC POH and LD tool.
SURFAC Prep to run 1" CS Hydrill pipe. Unable to work mule into conductor pipe.
Modify mule shoe. No success. Cut of 3" nipple on conductor.
SURFAC RIH w/1" pipe to TOC at 443'.
SURFAC Circ out 20 bbls cement. Pump 93 bbls FW.
SURFAC Pumped 133 bbls 10.5 cement (168 sx) to fill annulus.
SURFAC NO diverter. NU well head.
INTRM1 NU BOPE.
INTRM1 Install test plug. Test BOP to 300-4000 psi.
(ft)
COMMENTS
to 300/4000 psi. UPCOMING OPERA TIONS:CSG TEST AND LOT
Printed: 10/5/2004 4:28:38 PM
'-"
.,-,..
Page 1· of 1
ConocoPhUHps Alaska~]l1c.
Daily Drilling..· Reþdrt
I JOB NUMBER I EVENT CODE 124 HRS PROG
CD1-24 ODR
SUPERVISOR I RIG NAME & NO. I FIELD NAME I OCS NO.
DONALD LUTRICK Doyon Drilling Inc 19 ALPINE
CURRENT STATUS ACCIDENTS LAST 24 HRS.?
I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF
INC AZIM I LAST CASING
(in) @ (ft)
OP12RA110NSSOMMARv
TROUBLE SUB PHASE
NUND INTRM1
WELL NAME
DRLG @ 3800"
24 HR FORECAST
LITHOLOGY
LAST SURVEY: DATE . TMD
FROM TO HOURS
00:00 03:30 3.50
CODE
P
03:30 04:00 0.50 P INTRM1
04:00 06:00 2.00 P PULD INTRM1
06:00 07:30 1.50 Np OPER INTRM1
07:30 08:30 1.00 P TRIP INTRM1
08:30 09:00 0.50 P INTRM1
09:00 10:30 1.50 RIGMNT P RSRV INTRM1
10:30 11:00 0.50 RIGMNT P RSRV INTRM1
11:00 12:00 1.00 Np EOIP INTRM1
12:00 12:30 0.50 P TRIP INTRM1
12:30 13:00 0.50 P INTRM1
13:00 14:00 1.00 P CIRC INTRM1
14:00 15:00 1.00 CASE P DEOT INTRM1
15:00 17:00 2.00 P INTRM1
17:00 19:00 2.00 P INTRM1
19:00 19:30 O.~iO P CIRC INTRM1
19:30 20:00 0.50 P INTRM1
20:00 00:00 4.00 DRILL P DRLG INTRM1
TMD I TVD I DFS
2,831.0 2,396.0
AUTH MD I DAILY T AN~
DAILY INT WIO MUD
o
I REPT NO. I DATE
6 4/26/1999
ICUM. TANGO
CUM INTANG WI MUD
o
CUM COST WI MUD
699,534
DATE OF LAST SAFETY MEETING DAILY TOTAL
132,770
AFE
AUTH.
998B05
¡NEXT CASING
(in) @
(ft)
LAST BOP PRES TEST
4/26/1999
DESCRIPTION
Test BOPE to 300-3500 psi. Pull test plug. Install wear bushing. AOGCC rep
Lou Gramaldi waived witnessing test.
Pressure csg to 2000 psi to verify port collar was closed.
MU and orient BHA. RIH wI HWDP.
Anadrill did not check magnetic interference prior to RIH. POH. Add monel
pony collar between motor and MWD.
RIH to 2020'.
Shallow test MWD. Blow down.
Cut and slip drlg line.
Service top drive.
Work on top drive grabs. No comment. Rig maintenance.
RIH to 2665'.
Wash and ream fl 2665' to 2731'.
Circ and condition mud.
Test csg to 2500 psi. OK. Witnessed by AOGCC rep Lou Gramaldi.
POH wi 2 stds. Announced BOP drill. Shut well in. Pressure annulus to 300
psi. Held prejob meeting. Stripped in hole with 2 stds DP. Good performance
by all personnel and equipment. Witnessed by Lou Gramaldi.
Drill out cement and float equipment to 2821'. Drill 20' new hole to 2851'.
CBU.
Performed LOT. 13.4 EMW
Drlg f/2851' to 3300'. ADT - 3 hrs. Hole packed off while drlg at 3200' due to
high ROP in clay section. Slow ROP to 200'/hr.
COMMENTS
t cement and float equipment to 2821'. Drill 20' new hole to 2851'. Performed LOT 13.4 EMW. Drilling from 2851' to 3300'. Hole
packed off while drilling at 3200' due to high ROP in clay section. UPCOM
Printed: 10/4/2004 3:50:41 PM
CASING TEST and FORMATION INTEGRITY TEST
Well Name:
CD1-24
Date:
4/26/1999
Supervisor: Donald Lutrick
o Initial Casing Shoe Test
Reason(s) for test: 0 Formation Adequancy for Annular Injection
o Deep Test: Open Hole Adequacy for Higher Mud Weight
Casing Size and Description: 95/8" 36# J-55 BTC CSG
Casing Setting Depth:
Mud Weight:
EMW=
475
0.052 x 2389
Pump output = .101 BPS
2.800 psi
2,700 psi
2,600 psi
2,500 psi -------.-.-----
2,400 psi
2.300 psi
2,200 psi -
2,100 psi
2,000 psi
1,900 psi -
1 ,800 psi
W 1,700 psi
a: 1 ,600 psi ---
::::> 1.500 psi
~ 1,400 psi
W 1 ,300 psi
a: 1 .200 psi
a.. 1,100 psi
1,000 psi - -- II
900 psi
800 psi
700 PSI--r
600 pSI
500 pSI
400 pSI
300 psi i
200 psi
100 psi
o psi
2,821' TMD
2,389' TVD
Hole Depth: 2,851' TMD
2,407' TVD
9.6 PPG
Length of Open Hole: 30'
+ Mud Weight
475 psi
0.052 x 2,407'
9.6 PPG
=
EMW = 13.4 ppg
Fluid Pumped = 1.2
BLED BACK = .8 BBLS
~TIME LINE I
ONE MINUTE TICKS
I I I I I I I I I I I I
I I I I I I I ¡ I j I I I I I I I I I I I I I I
l ~..
I' . -.. .. ~.. .. .. .. ..
/
I
I'
-.- LEAK-OFF TEST
.......CASING TEST
--1Ð- LOT SHUT IN TIME
--k- CASING TEST SHUT IN TIME =
-t- TIME LINE
II1II IIIIIIII111
o 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
STROKES
NOTE: STROKES TURN TO MINUTES DURING "SHUT IN TIME":see time line above
LEAK-OFF DATA
CASING TEST DATA
MINUTES
MINUTES
ffiR ffiR
LOT· STROKES PRESSURE CSG TEST STROKES PRESSURE
, , 0 stks , 1 00 P.SI , [-_-__--_-_-_-_-_-_-_-_-_-_-_-+í-_-_-_O_--_-_š_-_t_k_-s_-_-_-_-+:-_-__--_f_õ_-_õ_-_n_s_-_f__--_J
:~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-~~~~~~; .- !: ~
!---------------~---~-~!~~---~---~!!Q.J?-~~---i ~--------------+---?--~!~~--+---?~~J!~~--~
!---------------~---~-~!~~---~---~~Q.J?-~L--i ~--------------+---~-~!:.~~--+---~~~-R~~--~
!---------------~---~-~!~~---~---~~~-J?-~L--i L_____________L__~_~!:.~~__+--.?~~-R~~--~
!_______________j___~_~!~~___L_~~º_.P_~~__J L____________j___ª_~!~~__+---ª~~-R~~--~
L____________j___1 0 stks_j___Zºº_J?_~~_j L_____________l__~_º_~!~~_l_!!º_ª_º_E~i!
! ! 12 stks ¡ 800 si ! L_____________l__~_?_~!:.~~.l_!!!~_º_E_
L_____________l__~_~_~!~~.l_!!~~_º_E~!j
L____________.l__~_~_~!~~_l!!?.~_º_E~!j
L_____________l__~_~_~!~~_l.!!~~_º_E~Lj
L_____________l--?-º-~!:.~-1_!!~~_º_E~!_l
L_____________L-?-?-~!~~j.-~!~~-º-E~!_l
L_____________l__?_~_~!~~j-~!~~-º-E~!_l
I=:=~:::~~::~~====:I ~-~~§~~
:---------------1---------------1-----------------: r--------------T--------------T----------------1
¡---------------i---------------i-----------------i i i : :
1==t-=--=:t:==:=J b~t==::~r
: : : : : 2.0 mln : : 2,480 P~"
I I . . ---------------+--------------+-------------.
!_~~'!!_~~_~~~-~~--------------~,~~!~~~~~~~'!~E ~--~:.º--~~~--.t--------------.t-~!~?-º-E~~-i
¡--g.:º-~~-r:!--~---------------~----?~º-P-~~---i ~-±:.º-!.!!~~-.t--------------+-~!~~-º-.e~~-~
¡___!.:º_~~~--~---------------~---Z~º-J?-~~--¡~--?-:.º-~~~_+--------------+-~!~~-~-E~~-~
¡---?.:º-~~~--~---------------~---~~º-.P-~~---i L-?_:.º_!.!!~~__L______________i_-~!~ª-º-E~!-~
¡___~.:º_~J~_j_______________l__~~º_J?_~~__j L_!..:.º_!.!!~~_.l______________+-~!~?-~-E~!-~
i___~.:º_~J_r:!J_______________L__~~~_J?_~~_.J L_?.:.º_!.!!~~.l______________l_~!~?_º_E~U
L_~.:º_~J~__L______________l__~~º_.P_~~_.J L_~:.º_!.!!~~_j______________L~!~~_º_E~!j
L_~.:º_~J~_J______________L_~~º_.P_~~_j L!_º.:g_!.!!~~j______________1.~!41 0 psi j
¡__X.:º_~ in ¡ ____________L_~~º_J?_~Lj L!_?.:g_!.!!~~_l______________l.~,4~_º_E~!j
¡___~.:..q_~.!.r:!.J-_____________j___~~º_.P_~_.J L?.º_·g_!!li~j______________l 2,400 psi j
I___~.:º_~J~__L--------------L-- 6~0 psi_.J L??_:.º_!!li~_1--------------1_~,3~-º-E~!_l
¡__!.<!:º_~J!!.J_______________L__~~º_J?_~~_j L~º_:.º_!!!~~L_____________L~!~~_º_E~!.J
NOTE: TO CLEAR DATA, HIGHLIGHT AND PRESS THE DELETE KEY
"--
-_/
Casing Detail
7" Intermediate Casing
WELL:
DATE:
1 OF 1
LENGTH
CD1-24
5/3/1999
PAGES
DEPTH
ARca Alaska, Inc.
Subsidiary of Atlantic Richfield Company
# ITEMS
COMPLETE DESCRIPTION OF EQUIPMENT RUN
7" DAVIS LYNCH FLOAT SHOE
2 jts 7" 26# L80 BTM CSG
7" DAVIS LYNCH FLOAT COLLAR
263JTS (JTS#3-#265) 7" 26# L80 BTM CSG
1 PIECE (JT# 266) 7" 26# L80 BTM
(LANDED CSG WITH 140K ON SLIPS)
RT TO CSG HEAD LDS
7" csg set AND CEMENTED @
1 .18 10771.00
79.09
1.40 10715.36
10628.41
25.92
35.00
10771.00
RUN ONE STRAIGHT BLADE CENTRALIZER ON JTS #1 -#29, AND
JTS # 31,33,35,37,39.41,43,45, AND #47. TOTAL 38 STRAIGHT BLADES.
RUN ONE BOW SPRING CENTRALIZER ON JTS # 196, 197,AND 198.
TOTAL 3 BOWSPRINGS.
DRIFTED TO 6.151"
USED BEST -O-LlFE 2000 DOPE
rv~AKE EVERY JT UP TO BASE OF TRIANGLE
RUN PIPE SLOW - KEEP IT FULL - RECORD DISPLACEMENT
\flASH TO BTM WITH FILL UP TOOL AND CIRC BEFORE MU CMT HEAD
WILL DISPLACE CMT WITH RIG PUMPS @ 8 BPM.
Remarks: . RAN CSG AND LANDED ON LANDING RING - LOST 20 BBLS MUD RUNNING CSG. UNABi
TO CIRC - PACKED OFF AND PUMPING IN. CSG STUCK WITH SHOE AT 10771. CEMENTED WITH PAF
RETURNS. LANDED CSG WITH 140K ON SLIPS.
Doyon 19
Drilling Supervisor: MIKE WHITELEY
....
~" ARCa Alaska, Inc.
I
Well Name: CD1-24
Rig Name: Doyon 19
Casing Size
7
Centràllzers
Comments:
Mud
Comments:
RAN tSGTOBTMs.HOLE
TOO!<2.oSSLSWlfllE
RUNNINGCSG; UNABLE TO
CiRC~puMF{EÖÄWAY +/. 400
~~L§M[JØ:
Wash 0
Comments:
$pØ.Cèr 0
Comnients:
LeadCemetit 0
Comments:
Tail Cement
Commerlis:
þišplåce.rlfeht
COmments:
Calculated top of cement:
8205
Remarks:
I Cement Company:
Hole Diameter:
8.5
Angle thru KRU:
93.8
Report Date: 05104199
AFC No.: 998805
Cementing Details
Report Number: 14 I
Field:
I
Shoe Depth:
10771
LC Depth:
10689
% washout:
State type used, in/eNals covered and spaoing
RAN ONE 7" X 8.5"OD STRAIGHT BLADE CENT. ON JTS #1-#29 AND ON JTS# 31,33,35,37,39,41,43,45, AND #47. RAN 3 BOW
SPRING ACROSS 9 5/6" SHOE ON JTS 1196,197, AND 196.
Weight:
10.3+ OUT
PV(prior cond):
Gels before:
Gels after:
Type:
ARCO
Type:
ARCO Spacer
Type:
Mix wtr temp:
Additives:
Type:
G
Mix wtr temp:
65
Additives:
D46 0.2%, 0065 0.25%, D800 0.25%, D167 0.180%
Rate(before tail at shoe):
7
Reciprocation length:
STUCK
Theoretical Displacement:
410
CP:
Date:5-4·99
Time:1900
I Rig Contractor:
PV(after cond):
YP(prior cond):
Total Volume Circulated:
PUMPED 475 BBS ·5% RETURNS. UNABLE TO CIRC
AND COND MUD.
Volume:
20
Volume:
50
No. of Sacks:
Weight:
No. of Sacks:
263
Weight:
15.8
Rate{tail around shoe):
7
Reciprocation speed:
o
Actual Displacement:
410
Bumped plug:
YES
Floats held:
YES
Approved By:
YP(after con d):
Weight:
8,4
Weight:
12.5
Yield:
Yield:
1.15
Str. WI. Up:
325
Str. WI. Down:
150
Str. WI. in mud:
140
'--
'~
ConocoPhillipsAlaskaJIJlc~
DailyDrUlingFh~port
I JOB NUMBER I EVENT CODE 124 HRS PROG TMD I TVD I DFS
CD1-24 ODR 10,796.0 6,947.0
SUPERVISOR I RIG NAME & NO. I FIELD NAME I OCS NO. AUTH MD I DAILY TANGO
MIKE WHITELEY Doyon Drilling Inc 19 ALPINE
CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INT WIO MUD
FREEZE PROTECT 9 5/8" X 7" CSG I NU BOPS 0
24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL
273,415
Page 1. of 1
WELL NAME
I REPT NO. I DATE
14 5/4/1999
CUM. TANGO
CUM INTANG WI MUD
o
CUM COST WI MUD
1,961,640
FROM TO HOURS CODE TROUBLE SUB
00:00 10:00 10.00 P
10:00 16:00 6.00 Np DH
I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF
INC AZIM I LAST CASING
(in) @ (ft)
OPERATIONS SUMMARY
PHASE
INTRM1
AFE
AUTH.
LITHOLOGY
998B05
LAST SURVEY: DATE TMD
I NEXT CASING
(in) @
(ft)
LAST BOP PRES TEST
4/26/1999
INTRM1
DESCRIPTION
RAN 7" 26# L80 BTM CSG TO 10787'. HOLE TOOK 20 BBLS WHILE
RUNNING PIPE.
WORK PIPE AND ATTEMPT TO BREAK CIRC.HOLE PACKED OFF-
PUMPING INTO FORMATION AT 1-2 BPM 650 PSI. SWABBING BACK
SOME RETURNS WHEN MOVING PIPE UP. LOST +1- 400 BBLS MUD. MUD
WT OUT 10.3+. STUCK 7" CSG - SHOE AT 10,771'.
WORKED STUCK CSG PULLING 125K OVER UP WT. NO MOVEMENT.
PJSM. ESTABLISHED PUMP RATE WITH MUD - 8 BBPM @ 1,140 PSI.
PUMPED TOTAL 72 BBLS. DOWELL CEMENTED 7" WITH SHOE AT
10,771'. PUMPED 20 BBLS ARCO WASH, 50 BBLS SPACER AT 12.5 PPG,
. AND 58 BBLS CEMENT AT 15.8 PPG. DISPLACED WITH 77 BBLS FW AND
333 BBLS 9.2 BRINE AT 7 BPM. HAD 30%-40% RETURNS WITH CEMENT
OUT SHOE. CSG STUCK - DID NOT RECIPICATE. BUMPED PLUG AND
PRESS UP TO 3,500 PSI. WELL FLOWING BACK - CLOSED HYDRIL ON 7"
CSG.- 150 PSI SICP. CIP @ 1900 HRS.
HELD 3,500 PSI ON CSG FOR 5 MIN. HELD. FLOATS HELD.
WOC - CLEAN PITS, CHANGED SHAKER SCREENS, LOAD TBG IN PIPE
SHED, PREPARE TO PU BOP'S.
16:00 16:30 0.50
16:30 19:00 2.50
Np DH
CEMENT P
PLUG
INTRM1
INTRM1
19:00 19:30 0.50
19:30 00:00 4.50
CEMENT P
CEMENT Nf))H
PUMP
INTRM1
INTRM1
COMMENTS
pe and attempt to break circ. Hole packed off, pumping into formation at 102 bpm. Swabbing back some returns when moving
pipe up. Lost +1- 400 bbls mud. Stuck 7" casing. Worked stuck casing, no moveme
Printed: 10/4/2004 3:51 :21 PM
CASING TEST and FORMATION INTEGRITY TEST
Well Name:
Date: 7/31/2000
Supervisor: LutricklCunningham
CD1-24
Reason(s) for test:
o Initial Casing Shoe Test
o Formation Adequacy for Annular Injection
o Deep Test: Open Hole Adequacy for Higher Mud Weight
Casing Size and Description: 7" 26# L80 BTC-mod csg
Casing Setting Depth: 10,771' TMD Hole Depth: 10,816' TMD
6,947' TVD 6,946' TVD
Mud Weight: 9.2 ppg Length of Open Hole Section: 45'
EMW= Leak-off Press. + Mud Weight = 980 psi + 9.2 ppg
0.052 x TVD 0.052 x 6,947'
EMW for open hole section = 11.9 ppg
Used cement unit
RiQ pump used
Pump output = 0.1010 bps
Fluid Pumped = 2.2 bbls
Fluid Bled Back = 1.0 bbls
NO
#2
3,800 psi
3.700 psi
~:~gg Þsi I I I II I I I I I III III I
3,400 psi
3.300 psi
I:æ §! -_·_~=:t~--_·
2,800 psi
2,700 psi
2,600 psi
2.500 psi
2,400 psi
W Ngg Þs:
a: 2,100 psi
:;) 2,000 psi ~
en 1 ,900 psi
CJ) 1 .800 psi
W 1,700 psi
a: 1 ,600 psi
a... 1,500 psi
1 ,400 psi ...,
1,300 psi
1 .200 psi . .
1,100 psi
1,ggg~i ,~ ~
800 . ..,- , D)"')..,¡¡.,~),.......
700~: ' -
~gg ~i =/1'
400 psi -
300 psi -
200 psi
1og~:.....
o 10 20 30
IIII ~ II 11II1III1 1111.11111
~
........,-
/.........................
JTIME LINE I
ONE MINUTE TICKS
I I
--- LEAK-OFF TEST
.......CASING TEST
-1Þ- LOT SHUT IN TIME
--.- CASING TEST SHUT IN TIME =
-+- TIME LINE
.._,_._..~M~,"","__~M,'"~~
50
60
40
STROKES
NOTE: STROKES TURN TO MINUTES DURING "SHUT IN TIME":see time line above
Modified by Scott Reynolds
LEAK-OFF DATA
70
MINUTES
FOR
LOT STROKES PRESSURE
E::::::::::::::!::::::l~:::::t:::ll~~~~;:::1
L_____________-L_____~~_º____.l---~-ºº-.P~!--j
~:=:::±j:±~b
L_____________--1_____~_~:º___.l---~ºº-.P~!-..i
L--------------L--J-~:º---_l---~~º-.P~!--_i
~---------------~-----~-~:º----~----~~º-.P-~~---i
L______________L____~_~:º____l___~~º_.P_~!__J
L____________--1_____~_~:º____L--~~º-.P-~!-__1
~---------------~----~-~~º----~---~~º-.P-~!---!
E3::~~3:~3
t~~~~t~~f~~3
Ë:=:Ë~=t=::::=:
I I I I
I I ' ,
: SHUT IN TIME : SHUT IN PRESSURE
~~~~~~9-~~~~~~~~~~~~~=~~~~~~~~¡~~~~ªQ2~~~~1
~---!;:º--~~~---~------------ ! 9«!º_.P_~~---t
~--~:º-!!l~~---4---------------.¡..---~~º-.P~!---l
'30 " , 860 . ,
~----;:---~~~---.¡---------------~---------.P-~~---i
~~~L-=--=~~
r---~;:º--~!~---j---------------.i----~!º-.P~!---!
~--Z;:º--~!~---~---------------~----~-ºº-.P..~!---i
L__~;:º__~!~__j_______________l___~ºº_.P~!__j
L___~;:º__~!~__j--------------_L--X~.P-~!-__1
L_!2:.º__'!.!~~__L______________L_X~º_.P_~!___1
ŒiPHILLIPS Alaska, Inc.
~ A Subsidiary of PHILLIPS PETROLEUM COMPANY
CASING TEST DATA
MINUTES
FOR
CSG TEST STROKES PRESSURE
E::::::::::::::!:::~:~~~::!:::l~~~~[::j
L______________L-~-~~k..~---L--~~º-E!~-j
L---------------¡---!~-~!~!--¡---~º-E!~-_1
~---------------¡---!?.-:»!:.~-..¡---~~º-E!~:-~
L______________L_~~_~!~__L_~_'_!~º_.P_~!_
L______________L_~~_:»!:.~~_j--~-'-~~º-.P~!-_4
L______________L~!!_~!~!__i-J-'-~~~-.P-~Lj
~---------------¡---~~-:»!:.~--¡--~-'XZº-.P-~~-~
L______________L_~~_~!~~__L_~_'_~Zº_.P_~!_j
L______________L-~~-:».!.~--L~_'_~!º_.P~!j
L--------------L-~-~!~~--L-~-'-~~º-.P~!_1
~---------------¡--~!!-:»!:.~~--¡--~-'-~Zº-.P~~-~
L______________L_~~_~!~~__L_?_'_~!º_.P~!_J
L______________L--~~-:».!.~~-_L-;i-'-~ºº-.P~!j
L---------------L-~~-~!~~--!-}-'-~~º-.P~!_1
~---------------t---~~-~.!.~~--t--~-'-~!º-.P~!-1
I I I I
¡----------------!---------------:----------------1
~---------------.:..---------------.:.-----------------:
I I I I
L i : :
: SHUT IN TIME : SHUT IN PRESSURE
t~~Q~9~~~I~~~~t~~~~~~~~~~~~~~[~~~~iQ2~~I]
L__~:.º_!.!.!!~___L-------------L-;i-'-~~?..P:!!j
¡ 2.0 min ! ¡ 3,490 psi ¡
[~~3~õ-m~~~~¡~~~~~~~~~~~~~~~[~~~~~~~~~
L_~;:º__'!.!~~___L____________l_}l!!!?..P~!_J
L_~:.º__~~~__1---------------L}-'-'!!!º-.P:!!j
L-~:.º--'!.!!~---L--------------L-~-'-~?~.P~!-J
~--Z:.º-!.!.!~~---t---------------¡-}-'-~Zº-.P-~!-~
L_~:.º_!.!.!~___L______________L_~_'_~~?..P:!!_J
L_~;:º__'!.!~~___L--------------L-~-'~~º-.P~!j
~--!2:.º-!.!.!~~--i---------------i--~-'~~?..P~!_1
~--~:.º--'!1~~--¡---------------¡-}-'-~~º-.P~~-~
L_~O' º-!.!.!~~_1______________1__;i,450 pSI ~
¡ 25.0 min ¡ ! 3,450 psi i
[=~Q~º~!!!~~~]~~~~~~~~~~~~~~J__~_'_~~º_.P~!_J
NOTE: TO CLEAR DATA, HIGHLIGHT AND PRESS THE DELETE KEY
~ PHILLIPS Alaska, Inc.
" A Subs.dtary of PHilLIPS PETROLEUM CQt.~PANY
Subject
c....o 1.. .a I.f n eí AI 1-<
File
ANWUi-ÞJl. (\ l~PC'\$AL-
Calculations Charj
~.......-
- ./
Sheet number
I By
:zAb.¡E: K.OE:A\7 / r/2
Date
I of I
/0/," (~ f\t\1
SH()\) L-D -rH'oS
p-oR- A.~tù ol-A.fL
Be: P e:p-¡::c AM. e:lJ
APP L-C c...~ 6 ~ .
\;:)~'-'- EV¡;."I<. I4.AVt:::;P£&ht.ITS Akp4,Je:D
.P l 'See ~A4- ). A Le'"A ~ 6 Efi::'- -rir'sT -!~t~(.
AtV D Þ\TfAù1ë"1J \;)í--rH7'.f¡::-A~flÀ~ 'It tJ~
NO-rl£ ~
-r1-l e: R.€ 1$ NO ANN Ol--Ap--( cr -S-/~ It,. X 7") _ 'LoT
1"0 P- U> ,- At.f.
'Sl E>IVE:..lJ
-~~~~
AJ-P« fV.~ . J)l?Jt.:.¿.lN c;
Q.L PRINTING (907) 563-4743
159-5881
Casing Detail
9-5/8" SURFACE CASING
ARC a Alaska, Inc.
# ITEMS
Subsidiary of Atlantic Richfield Company
COMPLETE DESCRIPTION OF EQUIPMENT RUN
63jts
2 its
Remarks:
RKB TO GL
FMC Gen V Mandrel Hanger
( Jts#3-#65) 19-5/8", 36#, J-55, BTC Casing
9 5/8" Davis Lynch Float Collar
I ( Jts#1-#2) 9 5/8" 36# J-55 BTC Csg
9 5/8" Davis Lynch FloatShoe
I
9-5/8" Casing Setting Depth
Threadlock the bottom four joints.
Run bow spring centralizers on Jts 1-12 and every other jt to surface
Total - 37. Center centralizers on jts#1 & 2 with stop rings
Circ bottoms up at 1 AOO'.
Use Best-O-Life 2000 thread dope
Doyon 19
Orillíng Supervísor: MIKE WHITELEY
WELL:
DATE:
1 OF 1
LENGTH
36.30
2.48
2546.95
1.48
85.34
1.77
===>
TO
CD1-26
9-19-99
PAGES
DEPTH
TOPS
36.30
38.78
2585.73
2587.21
2672.55
2674.32
2674.32
2674.32
'-'
.....
~" ARCO Alaska, Inc.
I
Casing Size
9.625
Well Name: CD1-26
Rig Name: Doyon 19
Angle thru KRU:
33
Report Date: 09/18/99
AFC No.: 998815
LC Depth:
2585
Centralizers
Comments:
Mud
Comments:
Wash 0
Comments:
Spacer 0
Comments:
Lead Cement 0
Comments:
Tall Cement 0
Comments:
Displacement 0
Comments:
Calculated top of cement:
SUFACE
Hole Diameter:
12.25
',--",
Report Number: 2
Field:
Cementing Details
I
Shoe Depth:
2674
State type used. inteNafs covered and spacing
RAN TOTAL 37 BOWS PRING CENTALlZER - ONE PER JT ON JTS #1 - #12. EVERY OTHER JTTO SURFACE.
Weight:
9.8
PV(prior cond):
28
PV(after cond):
17
YP(prior concl}:
32
Gels before:
28/75/88
Gels after:
6/28/52
Total Volume Circulated:
840
Volume:
65
Volume:
50
No. of Sacks:
471
Weight:
10.7
Type:
Water
Type:
ARCO Spacer
Type:
ASIII
Mix wtr temp:
70
Additives:
0053 -30.0 %, 0046 - 0.6%, D079 -1.5%, S001 -1.5 %, D124 - 50.0%, 0044·9.0 %
No. of Sacks:
230
Weight:
15.8
Type:
G
Mix wtr temp:
70
Rate(tail around shoe):
8.0
Reciprocation speed:
40FPM
Actual Displacement:
200
CP:
Date:9-19-99
Time:06:30
Remarks:FULL RETURNS THROUGHOUT JOB, RECIPICATED. CIRC 126 SX GOOD 10.7 PPG CMT TO SURFACE. CEMENT STOOD AT SURFACE.
Bumped plug:
YES
Floats held:
YES
cement Company:
DS
Additives:
0046·0.2 %,0065·0.3%,5001 - 0.1%
Rate(before tail at shoe):
7.5
Reciprocation length:
20
Theoretical Displacement:
200
I Rig Contractor:
DOYON
Approved By:
MIKE WHITELEY
% washout:
YP(after cond}:
11
Weight:
8.4
Weight:
10.5
Yield:
4.44
Yield:
1.17
Str. Wt. Up:
160
Str. Wt. Down:
135
Str. Wt. in mud:
80000
Page 1 of 1
ConocoPhilHps Alaska, Inc.
Daily Drilling Report
!TVD IDFS
2,683.0 i 2,396.0 i
AUTH MD I DAILY TANG
¡ 0
DAIL Y INT WIO MUD
o
DATE OF LAST SAFETY MEETING DAILY TOTAL
268,835
I REPT NO. II DATE
! 3 9/19/1999
CUM.TANG
I 0
CUM INT ANG WI MUD
o
CUM COST WI MUD
373,940
CD1-26
I
SUPERVISOR I RIG NAME & NO.
MIKE WHITELEY! Doyon Drilling Inc 19
I JOB NUMBER I EVENT CODE 124 HRS PROG
I I RST I
I FIELD NAME I OCS NO.
! ALPINE
ACCIDENTS LAST 24 HRS.?
DRILL I SHORT TRIP
I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF
I í I
INC AZIM I LAST CASING I NEXT CASING
, (in) @ (ft)· (in) @
OPERATIONS SUMMARY
PHASE DESCRIPTION
SURFAC FINISHED RUNNING TOTAL 65 JTS 95/8" CSG. MAKE UP HANGER AND
LANDING JT.
SURFAC CIRC AND COND MUD AND HOLE FOR CEMENT JOB. RECIPICATE PIPE.
PJSM.
SURFAC SET AND CEMENTED 95/8" CSG AT 2,674'. PUMPED 65 BBLS BIOZAN /
NUT PLUG SPACER. TEST LINES. DOWELL PUMPED 50 BBLS ARCO
SPACER AT 10.5 PPG, 374 BBLS AS3 LEAD (471 SXS) AT 10.7 PPG, 48
BBLS CL "G" TAIL AT 15.8 PPG (230 SX). DISPLACE AT 8 BPM. CIRC 126
SX GOOD 10.7 PPG SLURRY TO SURFACE. RECIPICATED I FULL
RETURNS. PLUG BUMPED - CIP AT 06:30 HRS. FLOATS HELD. CEMENT
STANDING AT SURFACE.
SURFAC! FLUSH OUT DIVERTER. LD CMT HEAD AND LANDING JT. CLEAR RIG
I FLOOR. WASH OUT DIVERTER
SURFAcI N.D. DIVERTER.
SURFAC, N.U. 11" 5M UNIHEAD.TEST MM SEAL TO 1,000 PSI.
SURFAC N.U. BOP'S.
SURFAC TEST BOP'S TO 250 PSI LOW AND 3,500 PSI HIGH. HYDRIL TO 2,500 PSI.
NO LEAKS. TEST WITNESS WAIVED BY CHUCK SCHEVE WITH AOGCC.
ACCUMULATOR DRILL. SET WEAR RING.
SURFAC SERVICE RIG.
INTRM1 MAKE UP BHA#2 - 8.5" PDC 6 3/4" X1 L MOTOR - AKO-1.2 DEG LWD MWD
- ORIENT TOOLS. LOAD SOURCE. SURFACE TEST.
INTRM1 RIH P.U. 21 JTS 5" DP.
INTRM1 ! CUT DRILLING LINE.
INTRM1 i RIH TO 2585'.D2 DRILL.
i
INTRM1 ! CIRC OUT THICK MUD.
;
INTRM1 ¡TEST 9 5/8" CSG TO 2500 PSI FOR 30 MIN. HELD.
INTRM1 I DRILL OUT PLUGS- FC AT 2587'- AND GOOD CEMENT TO 2664'.
INTRM1 ! CIRC CLEAN - DISPLACE HOLE WITH 9.6 PPG LSND MUD. CLEAN OUT
¡SURFACE EOUP.
WELL NAME
CURRENT STATUS
DRILLING AHEAD AT 3,376'.
24 HR FORECAST
LITHOLOGY
LAST SURVEY: DATE
TMD
FROM TO HOURS CODE TROUBLE SUB
00:00 02:00 2.00 P
02:00 04:00 2.00 P CIRC
04:00 06:30 2.50 CEMENT P PLUG
06:30 08:00 1.50 CEMENT PLUG
08:00 09:00 1.00 P NUND
09:00 09:30 0.50 P NUND
09:30 11 :30 2.00 P NUND
11 :30 16:00 4.50 WELCTL BOPE
16:00 16:30 0.50 RIGMNT P RSRV
16:30 18:30 2.00 P PULD
18:30 19:00 0.50 P TRIP
19:00 20:30 1.50 RIGMNT RSRV
20:30 21:00 0.50 P TRIP
21:00 21:30 0.50 P CIRC
21:30 22:30 1.00 CASE P DEOT
22:30 23:00 0.50 P
23:00 00:00 1.00 P CIRC
TMD
AFE
AUTH.
998B15
(ft)
LAST BOP PRES TEST
9/19/1999
COMMENTS
OPE to 250/3500 psi. Drill out plug, FC at 2587' and good cement to 2664'.
Printed: 10/5/2004 1 :51 :22 PM
CASING TEST and FORMATION INTEGRITY TEST
Well Name:
Date:
9/20/1999
Supervisor: MIKE WHITELEY
CD1-26
[2] Initial Casing Shoe Test
Reason(s) for test: 0 Formation Adequancy for Annular Injection
D Deep Test: Open Hole Adequacy for Higher Mud Weight
Casing Size and Description: 95/8" 36# J-55 BTC CSG
Casing Setting Depth:
2,674' TMD
2,389 TVD
Hole Depth: 2,703' TMD
2,413' TVD
Mud Weight:
Length of Open Hole: 29'
9.6 ppg
EMW=
750
0.052 x 2433
750 psi
0.052 x 2,413'
+ 9.6 ppg
+ Mud Weight
=
EMW = 15.5 ppg
Pump output = 0.1010 bps
VOL. PUMPED = 0.909
BLED BACK = 0.714
~TIMEUNE. I
QNEMINÛTE TICKS·
I I I I I I I I I I I I I I I I I
2,800 psi ---.
2,700 psi I I ¡ ¡ ¡ I
2,600 psi I I I ¡ I I I I t I ! I! III . I . I I I
2,500 psi -.------ ----"'~____,¡~:_o~;-;;¡;;_jI(r__;¡O¡~,
2,400 psi ____oo_u___________
2,300 psi -
2,200 psi --.---------------.--------
2,100 psi
2,000 psi -
1,900 psi
1 ,800 psi -
111 1 ,700 psi
a: 1,600 psi -----
::I 1,500 psi .-------
~ 1 ,400 psi
111 1,300 psi -
a: 1 ,200 psi
D. 1 ,100 psi
1,000 psi -------
900 psi
¡~ ~i JI"''1'''' ""',
~~~ ~:: - .-----
o psi
o 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84
stk stk stk stk stk stk stk stk stk stk stk stk stk stk stk stk stk stk stk stk slk slk stk slk slk stk stk slk slk slk stk stk slk stk stk stk stk stk stk stk stk stk stk
---
--.---
------.
-e- LEAK-OFF TEST
.....CASING TEST
LOT SHUT IN TIME
~Á.,-CASING TEST SHUT IN TIME -
-+- TIME LINE
I I I I I I I I I I I I I I I'"
STROKES
NOTE: STROKES TURN TO MINUTES DURING "SHUT IN TIME":see time line above
LEAK-OFF DATA
MINUTES
FOR
lOT
STROKES
PRESSURE
i ---------------1---------------1-----------------1
¡---------------r--Õ-stkš--r---3Õ-¡;-š¡----¡
¡ ---------------l---Tštj(-š---r--äõ-pšr---¡
¡ ---------------1---2-stkš---r--12Õ-p-š¡---¡
!~~~~~~~~~~~~~~~l~~~~ª~~!~~~~~l~~~~~~j?~~~~~~I
! ! 4 stks ! 340 psi !
¡---------------1----S-štj(-š---r--4SÕ-p-š¡---¡
¡ ---------------1---S-stks--r-5äõ-p-šr--¡
¡ ---------------l----fštj(-š---r-ääõ-p-š¡---¡
¡---------------r-ã-stkš---r--7SÕ-pšr--¡
¡---------------1----g-štj(-š--T--79õ-p-šr--¡
: ---------------1---------------,-------..---------t
¡---------------i---------------i-----------------i
! ---------------~---------------~-----------------i
I 1 1 1
¡---------------i---------------i-----------------i
! ---------------i---------------1-----------------i
1---------------i---------------1-----------------i
! ---------------1---------------1-----------------1
1 1 I 1
¡ ---------------i---------------i-----------------i
¡ ---------------i---------------i-----------------t
!---------------1---------------i-----------------1
; ---------------1---------------1-----------------f
I 1 I I
1 I I 1
: ---------------1---------------1-----------------t
: I : :
1___________..___..._______________.1________...._______&
I I I I
I I ' ,
¡ I ! !
: SHUT IN TIME; SHUT IN PRESSURE
i---õ~õ-miñ--l--------------T---ãõõ-p-šr--i
I_______________.._______________..__________..______
¡ ___!;º_~_in_.J--------------_1--z?.~_.P_~~___l
I 2 0 . I I 650 . I
!____;___~~n--~---------------~----------~-~~---!
; 3.0 mln : I 575 pSI :
!--4~Õ-m-iñ--r-------------r-5SÕ-p-š¡---i
! -----------:.----1---------------,--------------:---t
! ___~;º_~~n__~---------------~---~ª-~-.P-~~---!
¡___~;º_~Jn__l---------------j---~º-Q..P-~~-__!
¡ __.?;º_~Jn__j---------------1_--~º-~-.P-~~--_!
! 8.0 min ! ! 500 psi !
!--9~Õ-m-iñ--r------------T--5ÕÕ-p-š¡---¡
¡--1õ~õ-m¡ñ-l---------------r--5ÕÕ-p-šr--ì
!_______________.l_______________J_________________1
CASING TEST DATA
MINUTES
FOR
CSG TEST
STROKES
PRESSURE
--------------------------------------------------
1 I I I
. I I I
I I . .
r--------------T---õ--štks--T---3"õpšr--l
r--------------r--2-stks--T--"6õ-ps¡---1
r--------------T---4-stks--T---.¡2õ-ps¡--1
r--------------r--Ö-stks--r--26õ-ps¡--1
¡-------------T---Sstks·-r--4SÕ-psC-1
r--------------rTÕ--Štks--r--7Sõ--P-;j
I I I ~
r--------------r-f2--Štks-r--g-iõ-psi :
r--------------r-r,r-štks-r:¡:õ4-õ-p-Š¡-1
r--------------r-rã--štks¡-:¡:19-õ-p-šrl
[~~~~~~~~~~~~~~I~~~~~~~!~~~I~!;~?~º~p-~!~]
! ! 20 stks ! 1 ,540 psi :
...---------------.----------------..-----------------f
~--------------~--~-~-~!~~-~-!??~-º-E~!-~
~--------------~--?~-~!~~--~-!?.~~-º-E~~-~
: ; 26 stks : 2,160 pSI:
:---------------+--------------+--------------:--01
I : 28 stks ; 2,400 pSI :
;---------------+---------------~--------------:--_f
; : 29 stks ; 2,510 pSI:
~--------------t---------------~----------------1
~--------------t--------------+----------------i
~--------------+---------------~----------------1
I I I I
i ¡ ¡ i
; SHUT IN TIME I ; :
I..______________..I.._______________L.________________.I
! 0.0 min ! ¡ 2,510 psi!
t~~~~º~~[6~~I~~~~~~~~~~~~~~1~~;~~º~p_~!~]
! 10.0 min ! ! 2,500 " I
r-1-š:õ-mfñr-------------T2:SÕ-Õ-[, ,
r-2"õ.õ-mfñ-T--------------1-2:sõõ-ps¡-¡
[~g[~º~!!![6~I~~~~~~~~~~~~~~I~~;~~º~p_~!~]
~-ª-9-·g-!!!~~-+--------------+~??.~-º-E~!-i
r--------------t---------------r----------------i
...--------------~---------------...----------------'1
: I : :
I I I I
.----------------t----------------I"----------------...
I I I I
I I I I
I I I I
,.--------------..,..---------------r----------------...
I I I I
I . I I
. I I .
,.--------------..,..--------------.,.----------------...
I I I I
1 . I I
I I I I
...--------------.,----------------..----------------,
1 I I I
I I I I
I I I I
.----------------.----------------,..----------------.,
: : : :
!-______________-L_______________L________________..!
NOTE: TO CLEAR DATA, HIGHLIGHT AND PRESS THE DELETE KEY
Possible Error
Possible Error
ARca Alaska, Inc.
Casing Detail
7" Intermediate Casinq
Subsidiary of Atlar Subsidiary of Atlantic Richfield Company
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN
3-209
1-2
207 Jts
2 Jts
Remarks:
Doyon 19 RKB to LDS
FMC 11" X 7" Hanger
7" 26# L-80 BTCM Csg
7" Davis Lynch Float Collar
7" 26# L-80 BTCM Csg
7" Davis Lynch Float Shoe
Make csg up to base of triange - check each jt for make up.
Tread lock jts #1 -#4. Pump thru floats.
20 straight blade centralizers on jt #1 - #20
3 Bowspring centralizers on jt #145, #146 and #147
Break circ at 9 5/8" shoe -
Circ and cond mud to 9.7+ at 4,000' and 7,400'. Break circ slow-
circ at 6 bpm.
Monitor returns in pits - slow running speed if hole starts taking
mud,
Use Best-o-Life 2000 pipe dope
Well:
Date:
LENGTH
34.25
1.85
8434.93
1.42
79.57
1.73
Supervisor: MIKE WHITELEY
CD1-26
9/25/99
DEPTH
TOPS
34.25
36.10
8471 .03
8472.45
8552.02
8553.75
.~
..1IJtt..
~~ ARCa Alaska, Inc.
I Well Name: CD1-26
Rig Name: Doyon 19
Casing Size
7
Centralizers
Comments:
Mud
Comments:
Wash 0
Comments:
Spacer 0
Comments:
Lead Cement 0
Comments:
Tall Cement 0
Comments:
Displacement 0
Comments:
Calculated top of cement:
7417
I Cement Company:
Dowell
.-----
Shoe Depth:
8553
Cementing Details
Report Number: 10 I
Field: COLVILLE RIVER
I
Hole Diameter:
8.5
Angle thru KRU:
87
Report Date: 09126/99
AFC No.: 998B15
% washout:
LC Depth:
8471
State type used, intelVals covered and spacing
RAN 207" X 8.25" STRAIGHT BLADE CENTRALIZERS ON JTS#1-#20 AND THREE BOWSPRINGS ON JTS#145,#146, AND 41147.
Weight:
10.1
PV(prior cond):
11
CP:
Date:9-26-99
Time:08:20
Remarks: LOSSING RETURNS BEFORE CEMENT STARTED OUT SHOE - HOLE TOOK TOTAL 14 BBLS WHILE DISPLACING CEMENT OUT SHOE. MUD FELL IN
ANNULUS. HOLE STABILIZE IN 2 HRS - FILLED HOLE WITH TOTAL 15 BBLS MUD. FLOATS DID NOT HOLD.
Gels before:
9/11/15
Gels after:
5/819
Type:
ARCO
Type:
ARCO Spacer
Type:
Mix wtr temp:
Additives:
Type:
G
Mix wtr temp:
70
Additives:
0.2% D046, 0.25% D065, 0.25% D800, 0.18% D167
Rate(before tail at shoe}:
7
Reciprocation length:
20'
Theoretical Displacement:
324
I Rig Contractor:
DOYON
PV(after cond}:
9
YP(prior cond}:
24
YP(after cond):
13
Total Volume Circulated:
600
Volume:
Weight:
8.4
20
Volume:
50
Weight:
12.5
No. of Sacks:
Weight:
Yield:
No. of Sacks:
190
Weight:
15.8
Yield:
1.15
Rate(tail around shoe}:
7
Str. Wt. Up:
280K
Reciprocation speed:
20 FPM
Str. Wt. Down:
170K
Actual Displacement:
324
Str. WI. in mud:
187K
Bumped plug:
YES
Floats held:
NO
APproved By:
MIKE WHITELEY
ConocoPhilHpsAlaska, Inc.
Daily Drilling Report
Page 1 of 1
CD1-26
SUPERVISOR ! RIG NAME & NO.
MIKE WHITELEY í Doyon Drilling Inc 19
,¡I JOB NUMBER EVENT CODE 124 HRS PROG
I RST
, I FIELD NAME I OCS NO.
ALPINE
ACCIDENTS LAST 24 HRS.?
CURRENT STATUS
RIH WITH BHA #3 - PICKING UP 3.5" DP AT 0600 HRS.
24 HR FORECAST
TEST 7" CSG I DRILL OUT FLOAT EQUP I L.O.T.
LITHOLOGY I JAR HRS OF SERVICE I BHA HRS SINCE INSP LEAKOFF
LAST SURVEY: DATE TMD INC AZIM I LAST CASING
(in) @ (ft)
OPERATIONS SUMMARY
PHASE
INTRM1
WELL NAME
FROM TO HOURS CODE TROUBLE SUB
00:00 02:00 2.00 P CIRC
02:00 03:00 1.00 CASE P RUNC
03:00 03:30 0.50 P CIRC
03:30 05:00 1.50 CASE P RUNC
05:00 07:00 2.00 P CIRC
07:00 08:30 1.50 CEMENT P PLUG
08:30 12:30 4.00 CEMENT Nþ)H
12:30 13:00 0.50 CEMENT P PLUG
13:00 13:30 0.50 WELCTL ~ BOPE
13:30 I PUMP
14:30 1.00 CEMENT R
j
i
14:30 15:30 1.00 W ELCTL P¡ BOPE
15:30 20:00 4.50 WELCTL A BOPE
¡
20:00 22:30
22:30 00:00
RIGMNT pi
P
RSRV
2.50
1.50
TMD I TVD I DFS
8,564.0 I 7,011.0
AUTH MD I DAILY T AN~
DAILY INT WIO MUD
o
DATE OF LAST SAFETY MEETING DAILY TOTAL
142,425
i REPT NO. II DATE
I 10 9/26/1999
I CUM. TANG
I 0
CUM INTANG WI MUD
o
CUM COST WI MUD
1,375,695
AFE
AUTH.
998B15
I NEXT CASING
(in) @
(ft)
LAST BOP PRES TEST
9/26/1999
DESCRIPTION
NO RETURNS RUNNING LAST 5 JTS CSG - CIRC AT 6,670'. CIRC AT 3
BPM - MUD WT OUT 10.1 PPG. COND MUD TO 9.6 PPG. STRING IN LCM.
NO MUD LOSS WITH 9.6 PPG MUD.
INTRM1 RUN 7" CSG SLOW TO 7,317'.
INTRM1 CIRC AND COND MUD AT 7,317'. NO LOSSES.
INTRM1 RIH- BROKE CIRC AT 7,952'. MAKE UP HANGER AND LANDING JT. LAND
CSG AT 8,553'.
INTRM1 CIRC AND COND MUD AND HOLE FOR CEMENT JOB. RECIPICATED
PIPE. STRING IN LCM. NO MUD LOSSES. PUMPING 6.5 BPM / 9.6 PPG
MW.PJSM.
INTRM1 TEST LINES TO 3,500 PSI. PUMPED 20 BBLS WASH, 50 BBLS 12.5 PPG
SPACER WITH FLO-CELE, 39 BBLS 15.8 PPG CEMENT, 20 BBLS WATER.
DISPLACED WITH RIG PUMPS AT 7 BPM. HOLE STARTED TAKING MUD
BEFORE CMT WAS OUT SHOE ( 6 BBLS). LOSSES INCREASED AS
CEMENT WAS LIFTED UP ANNULUS. LOST 14 BBLS WITH CEMENT
DISPACED OUT SHOE. PLUG BUMPED. CIP @ 08:20 HRS. MUD FALLNG
IN ANNULUS. FLOATS DID NOT HOLD.
INTRM1 BUMPED PLUG TWO TIMES - FLOATS NOT HOLDING - WOC HOLDING
500 PSI SI PRESSURE.BACKSIDE TOOK 15 BBLS THEN STOOD FULL.
BLED PRESSURE OFF CSG - OK.
INTRM1 RD CEMENTING HEAD AND LD LANDING JT.
INTRM1 WASH OUT BOP'S.
INTRM1 PULLED WEAR BUSHING. INSTALLED 7" PACK-OFF. TESTED TO 5000
PSI FOR 10 MIN.
INTRM1 CHANGED TOP PIPE RAMS TO 3.5" X6".
INTRM1 SET TEST PLUG. TEST BOPS TO 250 PSI LOW AND 3500 PSI HIGH.
HYDRILL TO 3500 PSI. TEST WITNESSED WAIVED BY JOHN SPALDING
WITH AOGCC. ACCUMULATOR DRILL. PULLED TEST PLUG AND SET
WEAR RING.
INTRM1 PJSM. STRING UP NEW DRILLING LINE.
INTRM1 ¡CHANGE SAVER SUB IGRABBER DIES.
COMMENTS
mped plug, floats still not holding. Install packoff and test. Test BOPs to 250/3500 psi.
Printed: 10/5/2004 1 :51 :39 PM
'~
',-,'
ConocoPhillipsAlêlska,ll1c.
ÐailyØrilling<a~p()rt
I JOB NUMBER I EVENT CODE 124 HRS PROG
CD1-26 RST
SUPERVISOR I RIG NAME & NO. I FIELD NAME lacs NO.
MIKE WHITELEY Doyon Drilling Inc 19 ALPINE
CURRENT STATUS ACCIDENTS LAST 24 HRS.?
SQUEEZE 7" SHOE
I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF
INC AZIM LAST CASING
(in) @ (ft)
OÞE:RA"tIONS·SUMMARY
CODE TROUBLE SUB PHASE
RSRV INTRM1
PULD PROD
WELL NAME
POOH WITH USIT LOG
24 HR FORECAST
LITHOLOGY
LAST SURVEY: DATE
TMD
FROM TO
00:00 00:30
00:30 03:00
HOURS
0.50
2.50
RIGMNT P
P
03:00 09:00 6.00 P TRIP PROD
09:00 09:30 0.50 DRILL P REAM PROD
09:30 10:30 1.00 P CIRC PROD
10:30 11 :30 1.00 CASE P DEOT PROD
11:30 13:00 1.50 P PROD
13:00 13:30 0.50 P CIRC PROD
13:30 14:30 1.00 CASE P DEOT PROD
14:30 16:00 1.50 DRILL P DRLG PROD
16:00 16:30 0.50 P CIRC PROD
16:30 17:30 1.00 P PROD
17:30 18:30 1.00 P CIRC PROD
18:30 22:00 3.50 CEMENT f\~H PROD
22:00 00:00
CEMENT ï~H
PROD
2.00
TMD /TVD I DFS
8,586.0 7,012.0
AUTH MD I DAILY TAN~
DAILY INT W/O MUD
o
DATE OF LAST SAFETY MEETING DAlL Y TOTAL
156,529
I REPT NO. I DATE
11 9/27/1999
ICUM. TANGO
CUM INT ANG WI MUD
o
CUM COST WI MUD
1,532,224
AFE
AUTH.
998B15
I NEXT CASING
(in) @
(ft)
LAST BOP PRES TEST
9/26/1999
DESCRIPTION
SERVICE RIG AND TOP DRIVE.
MAKE UP BHA #4 - 61/8" PDC, TURBO STAB, 4 3/4" MACH 1X MOTOR-
AKO - 1.2 DEG, STAB, CSDP PUP, MWD (IMPULSE), PWD. ORIENT AND
SURFACE TEST.
RIH TO 8,342' - PU 3.5" DP.
WASH AND DRILL CEMENT TO 8,461'.
CIRC HOLE CLEAN FOR 7" CSG TEST.
TEST 7" CSG TO 3,500 PSI FOR 30 MIN. HELD.
DRILL OUT F.C. AT 8,481' (10' DEEP), AND 51' CEMENT TO 8,530' (28'
CEMENT LEFT IN SHOE JT).
CIRC FOR CSG TEST.
ATTEMPT TO TEST CSG - PUMPED IN @ 1200 PSI.
DRILL OUT CEMENT FLOAT SHOE @ 8563' AND 23' NEW FORMATION
TO 8586'.
CIRC AND COND MUD TO 9.6 PPG FOR L.OT.
RAN L.O.T. - EMW = 11.3 PPG.
CIRC
OBSERVE WELL. POOH TO RUN USIT LOG. L.D. BHA.KICK WHILE
TRIPPING DRILL. Relates to poor cement job where severe losses were
encountered while displacing the cement. 14 bbls were lost after cement was
displaced out of the shoe. Further losses occurred, with the fluid column falling
in the annulus. The US IT was run to confirm isolation since the well is an
injector. Results showed small amount of bond. Additional TDT logging will be
required after the well goes on injection. Suspect that losses occurred due to
wash flushing LCM out of the faults I fractures in the Alpine. Be prepared to
act quickly lor reduce displacement rate on wells where drilling losses have
been seen. Review use of Instaseal as a better LCM option prior to cementing.
Reduce wash volume in high risk wells.
WAIT ON SCHLUMBERGER TO R.U. TO RUN USIT LOG.SPILL DRILL. As
above. As above.
COMMENTS
out F.C. at 8481' and 51' cement to 8530'. Drill out cement float shoe @ 8563' and 23' new formation to 8586'. Ran LOT, EMW =
~1.3 ppg.
Printed: 10/5/2004 1:52:01 PM
Page 1 of 1
ConocoPhillips Alaska, Inc.
Daily Drilling Report
CD1-26
SUPERVISOR I RIG NAME & NO.
MIKE WHITELEY' Doyon Drilling Inc 19
CURRENT STATUS
I¡JOB NUMBER I.. EVENT CODE 124 HRS PROG
I RST I
I FIELD NAME I OCS NO.
! ALPINE
! ACCIDENTS LAST 24 HRS.?
TMD I TVD ! DFS
8,586.0 I 7,012.0 I
AUTH MD I DAILY TANG
¡ 0
jREPTNO. I DATE
, 12 19/28/1999
CUM. TANGO
CUM INT ANG WI MUD
o
CUM COST WI MUD
1,686,342
FIT TEST
I JAR HRS OF SERVICE I BHA HRS SINCE INSP II LEAKOFF
I I
INC AZIM I LAST CASING I NEXT CASING
(in) @ (ft) I (in) @
OPERATIONS SUMMARY
PHASE
PROD
PROD
WELL NAME
DRILLING CEMENT AT 8,375'.
24 HR FORECAST
LITHOLOGY
LAST SURVEY: DATE
TMD
FROM TO HOURS CODE TROUBLE SUB
00:00 00:30 0.50 P I
00:30 07:30 7.00 P
07:30 10:30 3.00 CEMENT N~H
10:30 12:00 1.50 CEMENT ~~H
12:00 13:00 1.00 CEMENT N~H
í
! CEMENT N~H
13:00 14:30 1.50
I
i
14:30 15:00 0.50 CEMENT N~H
15:00 19:00 4.00 CEMENT t'-I~H
!
i
19:00 21:30 2.50 CEMENT ~~H
21:30 22:30 1.00 CEMENT ~~H
22:30 23:00 0.50 CEMENT ~H
23:00 00:00 1.00 CEMENT ~~H
eze cement.
PROD
PROD
PROD
PROD
¡PROD
PROD
PROD
PROD
PROD
PROD
DAILY INT WIO MUD
o
DATE OF LAST SAFETY MEETING DAILY TOTAL
154,118
AFE
AUTH.
998B15
(ft)
LAST BOP PRES TEST
9/26/1999
DESCRIPTION
WAIT ON SCHLUMBERGER TO RIG UP.
PJSM. R.U. SCHLUMBERGER. RAN USIT LOG FROM 8,395' - 7,600'. TOP
OF CEMENT @ +1- 8,000' . POOH AND RD SCHLUMBERGER.
RIH WITH MULE SHOE SUB AND 3.5" DP TO SQUEEZE 7" SHOE. Shoe
squeeze required after poor LOT at 7in casing shoe. 11.3 ppg EMW was
obtained - minimum of 11.5 ppg EMW acceptable. Source of poor LOT was
same fault that casued the losses during the cement job. Squeeze shoe.
CIRC AND CONDITON MUD TO 9.4 PPG. As above. As above.
PJSM. TEST LINES TO 2,100 PSI.. DOWELL SPOTTED BALANCE
CEMENT PLUG FROM 8,586' - 7,803'. PUMPED 25 BBLS WATER, 30 BBLS
16.2 PPG SLURRY, 6.2 BBLS WATER, AND 41.5 BBLS MUD. As above. As
above.
PULLED 10 STDS TO 7,636'. CIRC BTMS UP.PULLED ONE STAND DP TO
7,540'. As above. As above.
SQUEEZED CEMENT TO 1,300 PSI. PUMPED 2.2 BBLS MUD TO
PRESSURE UP. Third shoe squeeze required at Alpine. Technique used is
proving very effective. As above.
HOLD 1,300 PSI SQUEEZE PRESSURE ON CEMENT FOR FOUR HOURS -
FINAL PRESSURE 1,100 PSI. FIRE DRILL. As above. As above.
OBSERVE WELL. POOH FOR STEERABLE BHA. As above. As above.
MAKE UP STEERABLE BHA. As above. As above.
CHANGE OUT CORRISON RING. As above. As above.
RIH. KICK WHILE TRIPPING DRILL. As above. As above.
COMMENTS
Prìnted: 10/5/2004 1 :52:17 PM
"'-'/
.---
Page .1·of1
ConocoPhilliPs..Alâ§ká,ln¢.
Dail.y.·.[)riIUngRepøtt
I JOB NUMBER I EVENT CODE /24 HRS PROG
CD1-26 RST
SUPERVISOR I RIG NAME & NO. I RELD NAME lacs NO.
DONALD LUTRICK Doyon Drilling Inc 19 ALPINE
CURRENT STATUS ACCIDENTS LAST 24 HRS.?
DRLG
I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF
INC AZIM I LAST CASING
(in) @ (ft)
OPERATIONS SUMMARY
PHASE
PROD
PROD
PROD
PROD
PROD
PROD
WELL NAME
DRLG AT 8975
24 HR FORECAST
LITHOLOGY
LAST SURVEY: DATE
TMD
FROM TO HOURS CODE TROUBLE SUB
00:00 01:30 1.50 CEMENT f\I))H
01:30 02:00 0.50 CEMENT f\I))H
02:00 07:30 5.50 CEMENT f\I))H
07:30 08:00 0.50 CEMENT f\I))H
08:00 08:30 0.50 CEMENT f\I))H
08:30 09:30 1.00 CEMENT f\I))H
09:30 10:00 0.50 CEMENT NJ))H PROD
10:00 13:00 3.00 P CIRC PROD
13:00 13:30 0.50 DRILL P DRLG PROD
13:30 14:30 1.00 Np DH CIRC PROD
14:30 15:30 1.00 Np DH CIRC PROD
15:30 17:30 2.00 Np DH CIRC PROD
17:30 18:30 1.00 Np DH CIRC PROD
18:30 19:30 1.00 Np DH CIRC PROD
19:30 23:00 3.50 DRILL P DRLG PROD
23:00 00:00 1.00 Np DH CIRC PROD
TMD I TVD I DFS
8,780.0 7,020.0
AUTH MD / DAILY T AN~
DAILY INT WIO MUD
o
DATE OF LAST SAFETY MEETING DAILY TOTAL
155,269
NO. DATE
13 9/29/1999
!CUM. TANGO
CUM INT ANG WI MUD
o
CUM COST WI MUD
1,841,611
AFE
AUTH.
998815
I NEXT CASING
(in) @
(ft)
LAST BOP PRES TEST
9/26/1999
DESCRIPTION
RIH TO 7,600'. As above. As above.
WASH FROM 7,600' TO TOP OF CEMENT AT 7,880'. As above. As above.
CLEAN OUT GOOD CEMENT FROM 7,880' - 8,586'. As above. As above.
CIRC AND COND MUD. As above. As above.
DRILL 20' NEW FORMATION TO 8,606'. As above. As above.
CIRC AND CONDITON MUD FOR L.O.T. - MUD WT 9.5 PPG. As above. As
above.
PERFORMED F.I.T. TO 12.5 PPG EMW. As above. As above.
PJSM. Displace well wi 9.2 flo pro mud. Clean surface equipment.
Drlg fl 8586' to 8606'. Lost 95% returns.
POH to shoe. Monitor well. Static loss 10-15 bph. Mix 45 ppb CaC03 pill.
Drilled 15ft after successful FIT and suffered losses - static 15 bph, drilling
approx. 100 bph. Fault I fractures causing losses. Spot LCM.
Spot pill at 2.5 bpm wi 0 returns. Calcium carbonate pill did not work. Only
use fibrous material on future losses, MI seal plus nutplug etc.
Monitor well. 10 bph loss. Mix 45 bbls 10 ppb med nut plug - 10 ppb fine MI
seal - 10 ppb med MI seal - 10 ppb CaCo3 coarse. Spot pill. Full returns when
pill hit formation. Close bag. Press annulus to 850 psi (11.5 EMW). No loss.
LCM pill initially successful but losses returned after drilling ahead. Likely that
more fractures are being drilled up. Add LCM to treat whole system.
Circ out LCM pill. As above. As above.
Lost returns when attempt to drill. Bypass shakers. Add 3 ppb med nut plug
and med MI seal to system. As above. As above.
Drlg fl 8621' to 8780'. ADT - 3.32 hrs. Started losing approx 120 bph to
formation.
Reduce pump rate. Mix 45 bbl LCM pill. New loss zone at 8780 ft MD. Spot
LCM pill. POH to shoe and squeeze. Effective allowing drill ahead.
COMMENTS
7880' to 8586'. Drill 20' new formation to 8606'. Performed FIT to 12.5 ppg EMW. PJSM. Drilling from 8586' to 8606'. Lost 95%
returns. Spot CaC03 pill. Spot nut plug, MI seal and CaC03 coarse. Full re
Printed: 10/5/2004 1 :52:31 PM
CASING TEST and FORMATION INTEGRITY TEST
Well Name:
CD1-26
Date:
9/26/1999
Supervisor: MIKE WHITELEY
o Initial Casing Shoe Test
Reason(s) for test: 0 Formation Adequancy for Annular Injection
o Deep Test: Open Hole Adequacy for Higher Mud Weight
Casing Size and Description: 9 5/8" 36# J-55 BTC CSG X 7" 26# L80 BTC MOD
Casing Setting Depth: 2,674' TMD Hole Depth: 8,564' TMD
2389 TVD 2,450' TVD
Mud Weight: 9.6 ppg Length of Open Hole: 5,259'
EMW= 625 + Mud Weight 625 psi + 9.6 ppg
0.052 x 2450 =
.052 X 2450
EMW = 14.5 ppg
_~ __ _....u.__...,_,_____ ____...__
Fluid Pumped = 7.0 bbl
~~J;QJt~çl:5..:==J.,º_ RþL.....
.....----..",--"....""---.----,--
700 psi
.... ..........jTIMELlNE I
7·,ONE MINUTE TICKS .
600 psi
-(~.
....--...-- ."-._...'",, ".,-"."""~-,,",-,.".... ,,-,-"----,---,-~,-"-~,--.--_._-,-
500 psi
w
a: 400 psi
:J
en
en
w
g: 300 psi
. ._..~.___".. .. _.. ..."".. ".h. ""..,_.,.".. .__..,,__..._....0.'_'." ,_,"__, .0........_, ''''.,._
200 psi .
..--.. -.- LEAK-OFF TEST
~CASING TEST
LOT SHUT IN TIME
----?c-- CASING TEST SHUT IN TIME
-4- TIME LINE
I ----J-
~. . ..... .,--_."'~---- -~" .,-"-,....,,..,,-_........,...._---,,-
o psi
o slk
_ ,.._.,'_.,"__0....__'_ _'._.__.'__'_.. _____.,w".__.__
3 "Ik
6 slk
9 slk
12 slk
15 stk
18 slk
21 elk
27 stk
30 stk
24 stk
STROKES
. -.--_.","-,,--,,-"-- .-.--,,,-.------
.__._--_._",,--~_.__._.__.".-
NOTE: STROKES TURN TO MINUTES DURING "SHUT IN TIME":see time line above
LEAK-OFF DATA
33 stk
MINUTES
FOR
LOT STROKES PRESSURE
1~:::~:::::~:lfI~lt!~:1
¡--------------T2-.513-ëï:::sr-44Õ--p-š¡--r
¡--------------T:rÕ--SSLST--S20p-š¡__-¡
¡--------------T3-.-Š-SSLSr-SSO-,:;šr--¡
¡--------------¡-4~õ--BsLST--62!rp-ši--l
¡---------------1-4,-.-š-ssLsr-62f-p-s¡--1
¡---------------rŠ~O-BB~~rr-610-p-š¡--¡
!~~~~~~~~~~~~~~~1~~~~~~~~~I~~~~~p~~~~~¡
: : 6.0 BBLS: 606 psi :
: ----- ----------~---------------~-----------------
: : 6.5BBLS: 596 psi :
: -- -------- -----~---------------~-----------------
: : 7.0BBLS: 581 psi :
¡ ------------- --1---------------1-----------------t
1---------------1---------------1-----------------1
¡ ---------------1---------------1--------- --------1
¡ ---------------1---------------1------ - ----------1
¡ ---------------i---------------i-----------------1
I~::~~:!~::=:j::~~::::::~
¡ ; I I
: SHUT IN TIME: SHUT IN PRESSURE
lìll:I:~::~~g::I~¡
: 5.0 mln : : 343 pSI :
¡---6~o-miñ-T--------------r-323-p-š¡--1
! ~~~~~º~~I~~~]~~~~~~~~~~~~~~~]~~~~~~E~~~~~~¡
! 8.0 min : : 283 psi !
!---9~O-miñ--l---------------r-263--p-šf-1
¡~~!Q~Q~~J~I~~~~~~~~~~~~~I~~~~~~~~~~~~]
CASING TEST DATA
MINUTES
FOR
CSG TEST
STROKES
PRESSURE
--------------------------------------------------
. . I I
I I I I
I I I I
...--------------~---------------I----------------_..II
I I I I
I I I I
I I I I
11---------------......---------------1- _____________ ___..II
I I I I
I I I I
I I I I
t-______________-t-_______________I-o________________...
I I I I
I I I I
I I I I
...-- ---- --------0-+------- ----------..----------------04
I I I I
I I I I
I I I I
t----------------r---------------t-----------------...
I I I I
I I I I
I I I .
....--------------.......---------------t-------------.
I I I
I I I
I I I
....--------------......---------------,..------------
I I ,
I I I I
I I I .
,---------------......---------------r----------------"'I
I I I I
I I I I
I I I I
....--- ---- --------..----------------r------------ ----.,
I I I I
I I I I
I I I I
....---------------r---------------r----------------.,
I I I I
I I I I
I I I ,
r---------------r---------------r----------------,
I I I I
I I I I
I I . I
r------- -- -----T--------- ------r----------------1
~------ --------t--------------+----- ---- -- - --- - i
~------ ------ --t-------------- +------------- - --1
~--------------+--------------+----------------1
¡---------------t--------------t----------------1
~--------------t-------------- t---------- -- ----1
~--------------t--------------+----------------1
~--------------t--------------+----------------1
¡ ¡ ¡ ¡
!-____ _____ __ - _ _-!.. _ ______ _ _ _ _____!.._ _ _____ __ _... _ _ ___ J
NOTE: TO CLEAR DATA, HIGHLIGHT AND PRESS THE DELETE KEY
PRESSURE INTEGRITY TEST
CONOCOPHILLlPS Alaska, Inc.
Well Name: I I Rig: Doyon ~ I _ Volume loput Pump Rate:
Drilling Supervisor: Burley pump used Other - See r... I B I ..... blsjStrk Bbljmin ....
arre s
Type of Test: : Annulus Leak Off Test for Disposal Adequacy V I Pumping down "annulus. II
Hole S I I _ Hole Pum in Shut-in
RKS-CHF:I 3471Ft 01 I 10.215IFt~I\IIº~ :
Size and 9-5/8' 36#/Ft '-5' ~r ~
IJUlt:1 \"d;:'lIl!:: ments
~ . . ~-
outer casing stnng. ...."""'''.:; ""'.... In.
~ize n~~;~r casing.
....."'t-'''.. n"'N
Enter inner at riç¡ht EMW: 1/;,)
- for Test 995' csl ·0.9 bbls
. I v
EMW :::: Mud Weight - 950 PIT 15 Second
0.052 TVD 0.052 x 2343 ... 7.03 Shut-in Pressure, psi 4.
EMW at 3408 FtpMD (2343 FtpTVD) = 14.8 920
----
1000 -. f::r: -
;:. -
þ - .~
/ T
I
I I
I I
w j I
-,,"
0:: r I I
:;)
(f) 500 I I
(f) /
w I I
0::
Q.. /
¡ I
I
3 30
AL .....
_I~'u 11;:::;1 1-'11 I-'Olnt
kk
)
)
G. C. Alvord
Alpine Drilling Team Leader
Drilling & Wells
ConocriP'hillips
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-265-6120
July 13, 2004
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Subject: Well Completion Report for CD1-08 (APD 204-059)
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Well Completion Report for the
recent drilling operations on the Alpine well CD1-08.
If you have any questions regarding this matter, please contact me at 265-6120.
Sincerely,
J1 (" (1.;( L
lZ". ~ vy............
G. C. Alvord
Alpine Drilling Team leader
CPAI Drilling and Wells
J,; ," 1 ,~~ 7004
I UL ' '~:t ...
GCA/skad
OR\G\NAl
) STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 a. Well Status: Oil 0
Gas U
WAG 0
Plugged D Abandoned D
20AAC 25.105
No. of Completions _
WINJ 0
WDSPL 0
Suspended D
20AAC 25.110
Other _
GINJ 0
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
1b. Well Class:
Development 0 Exploratory D
Service 0 Stratigraphic Test D
¡g j;j) ,.,CI~2. Permit to Drill Number:
May).( 2004 't·IS 204-059 I
13. API Number:
50-1 03-20489-00
5. Date Camp., Susp.,
or Aband.:
6. Date Spudded:
April 28, 2004
7. Date TD Reached:
/
P. O. Box 100360, Anchorage, AK 99510-0360
4a. Location of Well (Governmental Section):
Surlace: 272'FNL,2757'FEL,Sec.5,T11N,R5E, UM
At Top Productive
Horizon: 307' FSL, 571' FWL, Sec. 3, T11 N, R5E, UM
Total Depth:
(
May 11, 2004
8. KB Elevation (ft):
36.5' RKB I 56' AMSL
9. Plug Back Depth (MD + TVD):
I 15837' MD I 6934' TVD /
10. Total Depth (MD + TVD):
15837' MD I 6934' TVD
2581' FSL, 2198' FWL, Sec. 10, T11 N, R5E, UM
4b. Location of Well (State Base Plane Coordinates):
Surlace: x- 385951 ! y-
TPI: x- 394500 y-
Total Depth: x- 396090 y-
18. Directional Survey: Yes 0 NoU
/
5975855
5971029
5968000
Zone-4
Zone-4
11. Depth where SSSV set:
SSSV @ 2299'
Zone-4
19. Water Depth, if Offshore:
N/A
20. Thickness of
feet MSL Permafrost:
1950' MD
21. Logs Run:
G R/Res/Dens/Neutron
22.
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD
TOP BOTTOM TOP BOTTOM
36' 114' 36' 114'
36' 3408' 36' 2348'
36' 12515' 36' 6927'
12.25"
CASING SIZE WT. PER FT.
16" 62.5#
9.625" 36#
7" 26#
GRADE
H-40
J-55
L-80
23. Perforations open to Production (MD + TVD of Top and Bottom
Interval, Size and Number; if none, state "none"):
24.
SIZE
3.5"
/
open hole completion from 12515'-15837' MD 6927'-6935' TVD 25.
14. Well Name and Number:
CD1-08
15. Field/Pool(s):
Colville River Field
Alpine Oil Pool
16. Property Designation:
ADL 025559, 372095
17. Land Use Permit:
ALK N/A
HOLE
SIZE
CEMENTING RECORD
AMOUNT
PULLED
42"
pre-installed
526 sx AS Lite, 235 sx Class G
90 sx LiteCrete, 108 sx Class G
8.5"
TUBING RECORD
DEPTH SET (MD)
11821'
PACKER SET
11754'
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
n/a
26. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
July 6, 2004 Gas Lift Oil
Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-Oil RATIO
7/8/2004 8 hours Test Period --> 1693 912 0 58% 787
Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - API (corr)
press. 600 psi 1300 24-Hour Rate -> 4646 3654 0 not available
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
.' ,..
I.'; I H/;' j" '~" ~~";'
NONE
, 5, ~~~~!?~ Œ-<rM '\ (l<;~~
--~~:~h_ i
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE
ORIGINAL
~'"I~~'"
~:'~,
F
i . ~;
;..Jt)~ ;~
nll4
-
~
~~ ~
28.
29.
GEOLOGIC MARKERS
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested, and
attach detailed supporting data as necessary. If no tests were
conducted, state "None".
CD1-08
Seabee Form.
Nanushak
Gamma Ray Shale
Kalubik
Kuparuk Formation
Miluveach
Top Alpine 0
Top Alpine C
Base Alpine C
TO
3485'
6222'
11392'
11680'
11766'
11873'
12296'
12424'
15645'
15837'
2382'
3802'
6520'
6671'
6714'
6763'
6897'
6917'
6934'
6935'
N/A
1 .(.~~ '1.004
30. LIST OF ATTACHMENTS
Summary of Daily Operations, Directional Survey
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact: Vern Johnson @ 265-6081
Printed Name /'. .l"- ~ðAlvord
Signature .k,! , .{ .~
/ --
Title:
Phone
AI cine Drillina Team Leader
ê.." ç --, t 2..,
Date
7((~/ 04-
Prepared by Sharon Allsup-Drake
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water
supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: True vertical thickness.
Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item
23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to
be separately produced, showing the data pertinent to such interval).
Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other (explain).
Item 27: If no cores taken, indicate "none".
Item 29: List all test information. If none, state "None".
Form 10-407 Revised 2/2003
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
GonocÓPhillips Alaska
OpE!tatiol1s SUl11l1'1âry Report .
CD1-08
CD1-08
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start: 4/27/2004
Rig Release: 5/14/2004
Rig Number:
Spud Date: 4/28/2004
End: 5/14/2004
Group:
4/27/2004
12:00 - 18:00
18:00 - 19:30
19:30 - 21 :00
21 :00 - 00:00
4/28/2004
00:00 - 03:15
03:15 - 03:45
03:45 - 06:30
06:30 - 07:15
07:15 - 07:30
07:30 - 12:00
··Sub
Codê
MOVE MOVE
Move rig f/ CD1-46 to CD1-08 - Spot rig over well - spot Pit & motor
complexes - spot ball mill
Connect up service lines - (water, steam, water, air, & electric)
NU riser & flow line - set mouse hole (Accpeted rig @ 1930hrs.)
PU 5" DP from pipe shed & stand back in derrick
6.00 MOVE
1.50 MOVE
1.50 DRI LL
3.00 DRILL
RURD MOVE
RIRD SURFAC
PULD SURFAC
3.25 DRILL
0.50 DRILL
2.75 DRILL
0.75 DRILL
0.25 DRILL
4.50 DRILL
Note - Tested ESD for CD1-9
PULD SURFAC Finish PU and std back 5" DP, HWDP, Jars and 8" flex collars.
SFTY SURFAC Prespud meeting with all on-duty personnel.
PULD SURFAC PU BHA #1.
OTHR SURFAC Fill riser. Check for leaks. Test surface equipment to 3500 psi.
REAM SURFAC Clean out conductor from 110' to 114'.
DRLG SURFAC Directionally drill 12 1/4" hole f/114' to 525' MD - 524' TVD
ADT-1.75 hrs = ART-0.50 hrs AST-1.25 hrs
WOB - 0/20 k RPM 50 GPM 400 @ 750 psi
String wt. - PU 100 SO 100 Rot. 100
Torque on/off btm - 4000/3500 ft. Ibs
Gyro surveys @ 80',170',260', & 351'
12:00 - 00:00 12.00 DRILL DRLG SURFAC Directionally drill 12 1/4" hole f/525' to 1714' MD - 1482' TVD
ADT - 6.92 hrs = ART - 1.10 hrs. AST - 5.82 hrs.
WOB 25/35 k RPM 50 GPM 457 @ 1340 psi
String wt. PU 120 SO 115 Rot 120
Torque on/off btm. - 8500/6500 ft. Ibs.
4/29/2004 00:00 - 12:00 12.00 DRILL DRLG SURFAC Directionally drill 12 1/4" hole f/ 1714' to 3111' MD - 2193' TVD
ADT - 7.69 hrs = ART - 6.95 hrs. AST - 0.74 hrs.
WOB 10/30 k RPM 60/85 GPM 651 @ 2340 psi
String wt. PU 140 SO 115 Rot 130
Torque on/off btm. - 8500/7500 ft. Ibs.
12:00 - 17:00 5.00 DRILL DRLG SURFAC Directionally drill 12 1/4" hole f/ 3111' to 3418' MD - 2348' TVD
ADT -3.5 hrs. = ART - 3.05 hrs. AST - .45 hrs.
WOB 20/25 k RPM 60/85 GPM 647 @ 2500 psi
String wt. PU 140 So 115 Rot 130
Torque on/off btm - 8500/7500 ft. Ibs.
17:00 - 18:00 1.00 DRILL CIRC SURFAC Pump lo-vis sweep & circ hole clean for wiper trip - 647 gpm @ 2300
psi w/ 80 rpm's
18:00 - 22:00 4.00 DRILL WIPR SURFAC Wiper trip f/3418' to 1808' - back ream out w/ 500 gpm1450 psi w/50
rpm's
22:00 - 23:00 1.00 DRILL TRIP SURFAC Flow check (static) - RIH f/1808' to 3325' - hole slick going in
23:00 - 00:00 1.00 DRILL CIRC SURFAC Wash down f/ 3325' to 3418' - Circulate hole clean 2 X btms up - 647
gpm @ 2470 psi w/70 rpm's - std. back 1 std after each bottoms up
4/30/2004 00:00 - 00:30 0.50 DRILL CIRC SURFAC Finish circ and cond mud for csg job. at 650 gpm - 2500 psi - 80 rpms.
00:30 - 01 :45 1.25 DRILL TRIP SURFAC Check flow. Blow down top drive. POH on trip tank to 1831'. 50k
overpull at 1831'.
01 :45 - 03:15 1.50 DRILL TRIP SURFAC RIH to 1901'. Back ream w/ pump at 400 gpm and 40 rpms to 1435'.
03: 15 - 03:45 0.50 DRILL TRIP SURFAC POH on trip tank to 1042'. 15k over and slight swabbing.
03:45 - 04:15 0.50 DRILL TRIP SURFAC Back ream w/ pump at 400 gpm and 40 rpms to 883'. Check flow. (OK)
04:15 - 05:00 0.75 DRILL TRIP SURFAC POH on trip tank to 255'. Std back HWDP and jars.
05:00 - 07:45 2.75 DRILL PULD SURFAC LD BHA #1.
07:45 - 09:30 1.75 CASE RURD SURFAC RU to run 9 5/8" csg.
09:30 - 09:45 0.25 CASE SFTY SURFAC PJSM on running csg.
09:45 - 15:30 5.75 CASE RUNC SURFAC Run 95/8" 36# J-55 BTC casing as follows: FS(Ray Oil Tool "Silver
Printed: 6/23/2004 3:47:22 PM
")
)
ConocoPhilHps Alaska
QperationsSummaryReport
Page 2 of7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD1-08
CD 1-08
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start: 4/27/2004
Rig Release: 5/14/2004
Rig Number:
Spud Date: 4/28/2004
End: 5/14/2004
Group:
Sub
Hours· Code· Code Phase
4/30/2004 09:45 - 15:30 5.75 CASE RUNC SURFAC Bullet") 2 jts. FC (Weatherford) - 2 jts. (fill pipe & check floats - 1st. 4
connections made up wI BakerLoc) - 45 jts.(49 total) - Break circ @
2010' & circ btms up - continue running pipe - 31 jts. (80 total) to 3286' -
Casing tong broke
15:30 - 16:00 0.50 CASE CIRC SURFAC Change out casing tongs - Circ @ 3.5 BPM @ 300 psi while changing
out tongs
16:00 - 16:30 0.50 CASE RUNC SURFAC Finish running 9 5/8" 36# J-55 BTC csg. - 2 jts.(82jts total) PU hanger &
landing jt. - land casing on FMC fluted hanger on landing ring wI shoe
@ 3408' & FC @ 3319'
16:30 - 17:00 0.50 CASE RURD SURFAC RD casing tongs, Frank's fill up tool - blow down TO - RU cement head
& lines
17:00 - 18:30 1.50 CEMEN CIRC SURFAC Break circulation - Circulate & condition for cement job - ICR 3.5 bpm
@ 290 psi - FCR 7 bpm @ 380 psi
18:30 - 18:45 0.25 CEMEN SFTY SURFAC Held PJSM for cement procedure
18:45 - 21 :00 2.25 CEMEN PUMP SURFAC Cement 9 5/8" casing as follows: Pumped 40 bbls Biozan water wi nut
plug for marker wI rig pump - Switch over to Dowell - Pumped 5 bbls
water - Tested lines to 2500 psi - Dropped bottom plug - Mixed &
pumped 50 bbls Mud Push XL spacer @ 10.5 ppg @ 5.6 bpm @ 214
psi - Mix & pump Lead slurry(AS3lite) @ 10.7 ppg @ 7.4 bpm @ 200
psi - Observed nut plug @ shakers wi 384 bbls lead slurry pumped -
pumped down tub - total of 401 bbls lead (526 sks) - Mixed & pumped
Tail slurry (Class G wI .20% 046, .30% 065, 2% S001) 47 bbls (227
sks) @ 15.8 ppg @ 4.6 bpm @ 250 psi - Dropped top plug wI 20 bbls
water fl Dowell - Switched over to rig pumps & displaced cement wi
236.7 bbls 9.8 ppg mud @ 7 bpm @ 470 to 750 psi for first 220 bbls
displacement - slowed pumps to 4 bpm for last 16.7 bbls @ 570 to 610
psi - Bumped plug wI 1100 psi - Floats held - CIP @ 2056 hrs.
Full returns throughout job wi 157 bbls cement returns to surface
21 :00 - 22:00 1.00 CEMEN SURFAC RU & test 9 5/8" casing to 2500 psi for 30 mins. - RD test equipment
22:00 - 23:00 1.00 CEMEN SURFAC RD cement lines & cement head - LD long bails, casing elevators, &
landing jt.- blow down cement line
23:00 - 00:00 1.00 WELCT NUND SURFAC ND riser - CIO junk sub
5/1/2004 00:00 - 01 :00 1.00 WELCT NUND SURFAC ND surface riser and speed head.
01 :00 - 03:00 2.00 WELCT NUND SURFAC NU FMC Uni-head and BOPE. Test MTM seal on head to 1000 psi.
03:00 - 09:00 6.00 WELCT BOPE SURFAC RU test equipment. Test BOPE to 250 - 5000 psi with annular to 3500
psi. Witness of test waived by AOGCC rep John Spalding. RD test
equipment. Set wear bushing.
09:00 - 09:30 0.50 DRILL RfRD SURFAC RU bails and elevators. RU Geo-pilot surface equipment.
09:30 - 10:45 1.25 DRILL PULD SURFAC Move 5 stds HWDP to OS of derrick. RIH wi 4 stds HWDP and 17 stds
5" DP.
10:45 - 14:00 3.25 DRILL PULD SURFAC POOH & LD 5" DP & HWDP
14:00 - 18:00 4.00 DRILL PULD SURFAC Change out drilling jars - PU BHA components to rig floor - MU BHA # 2
- 81/2" bit, GeoPilot, MOW - Upload MWD - PU NM flex DC's - RIH wi
HWDP & Jars & #1 ghost reamer
18:00 - 19:00 1.00 DRILL OTHR SURFAC Change over to 4" handling equipment - Change valve of GeoSpan skid
- Test Geo Span to 2500 psi - Test MWD
19:00 - 20:00 1.00 DRILL TRIP SURFAC RIH wI BHA #2 f/643' to 3130'
20:00 - 21 :30 1.50 RIGMNT RSRV SURFAC Slip & cut drill line - Service TO
21 :30 - 22:00 0.50 DRILL REAM SURFAC Wash & ream fl 3130' to 3289'
22:00 - 00:00 2.00 CEMEN DSHO SURFAC Clean out cmt fl 3289' to 3318' - drill up wiper plugs & FC @ 3319' -
clean out cmt to 3322'
5/2/2004 00:00 - 01 :00 1.00 CEMEN DSHO SURFAC Drill out cement and float equipment from 3322' to 3414'. 50 rpm - 8500
tq - 0-8k bit wt - 588 gpm at 2600 psi. Hanging up at 3408'(float shoe)
Printed: 6/23/2004 3:47:22 PM
)
)
ConocoPhillips Alaska
Operations Summary Report
up and down.
Work pipe up and down from 3414' to 3244' to attempt to clear tools.
Drill out cement from 3414' to 3418' and new formation from 3418' to
3422'. Did not want to drill off. Rollers on Geo-pilot at the shoe took 25k
weight. Did not attempt to force rollers through shoe.
Displace well to 9.6 LSND mud.
Check flow. POH f/3400' to 2400'. Pump dry-job. POH.
Inspect bit and Geo-pilot. A few minor chipped cutters on bit and the
leading roller on each roller section was damaged on the GeoPilot.
Download MWD. LD MWD and Geo-pilot.
RIH wi mill tooth bit to 3243'. Filled pipe at 1500'.
Ream from 3243' to 3422'. 500 gpms@ 980 psi and 70 rpms. Bit took
wt from 3414' to 3418'. No excess torque. Work bit through shoe. No
drag.- Drill fl 3422' to 3438'
Pump hi -vis sweep @ 617 gpm @ 1500 psi wi 90 rpm - Circulate fro
FIT
RU & attempt to perform FIT to 18.0 ppg EMW - formation leaked-off @
16.2 ppg EMW - RD equipment
POOH wi mill tooth bit assembly - LD ghost reamer
Change handling equipment to 5" - LD ghost reamer #2
Std. back HWDP - MU BHA #3 GeoPilot #2 - Upload MWD - RIH wi NM
flex DC's & HWDP to 545'
Change handling equipment to 4" - PU 1 std. 4" dp & ghost reamer #1 -
Shallow test MOW
RIH f/640' to 3315' (PU ghost reamer #2 @ 1780')
Break in Geo Pilot bearings - RIH f/3315' to 3430' wi no pump-
Observed 5 to 8 k drag wi GeoPilot housing going through shoe @
3408'
Drill 8 1/2" hole wi GeoPilot fl 3438' to 3507' Md - 2400 ' TVD ADT - .4
hrs.
WOB - 0/5 RPM 100 GPM 597 @ 1630 psi
String wt. PU 150 SO 95 Rot. 117
Torque on I off btm. - 9500/8500 ft. Ibs.
12.00 DRILL DRLG INTRM1 Directionally drill 8 1/2" hole wi Geo-pilot f/3507' to 4844' MD - 3138'
TVD
ADT -7.24 hrs
WOB 12/15 k RPM 90/150 GPM 550 @ 2150 psi
String wt. PU 165 So 105 Rot 125
Torque onloff btm - 10,000 I 9500 ft. Ibs.
ECD 10.2 - 11.0
12.00 DRILL DRLG INTRM1 Directionally drill 8 1/2" hole w/Geo-pilot f/4844' to 6276' MD 3828'
TVD
ADT - 8.48 hrs.
WOB 12/18 k RPM 150 GPM 597 @ 3400 psi
String wt. PU 175 SO 110 Rot. 120
Torque onloff btm - 15,000/9500 ft. Ibs.
ECD - 10.7 - 11.3
12.00 DRILL DRLG INTRM1 Directionally drill 8 1/2" hole f/6276' to 7802' MD 4615' TVD
ADT - 7.88 hrs.
WOB 10/20 k RPM 110/140 GPM 630 @ 3350 psi
String wt. PU 215 So 115 Rot 145
Torque onloff btm - 14,500/13,000 ft. Ibs.
ECD - 10.6 to 11.1
Legal Well Name: CD1-08
Common Well Name: CD1-08
Event Name: ROT - DRILLING
Contractor Name: Doyon Drilling Inc
Rig Name: Doyon 19
Date From - To
5/2/2004 00:00 - 01 :00 1.00 CEMEN DSHO SURFAC
01 :00 - 02:45 1.75 CEMEN DSHO SURFAC
02:45 - 03: 15 0.50 CEMEN DSHO SURFAC
03: 15 - 03:30 0.25 DRILL CIRC SURFAC
03:30 - 06:30 3.00 DRILL TRIP SURFAC
06:30 - 08:30 2.00 DRILL PULD SURFAC
08:30 - 11 :30 3.00 DRILL TRIP SURFAC
11 :30 - 14:00 2.50 DRILL REAM SURFAC
14:00 - 14:30 0.50 DRILL CIRC SURFAC
14:30 - 15:30 1.00 DRILL LOT SURFAC
15:30 - 17:00 1.50 DRILL TRIP INTRM1
17:00 - 17:30 0.50 DRILL PULD INTRM1
17:30 - 21 :00 3.50 DRILL PULD INTRM1
21 :00 - 21 :30 0.50 DRILL OTHR INTRM1
21 :30 - 23:00 1.50 DRILL TRIP INTRM1
23:00 - 23:30 0.50 DRILL TRIP INTRM1
23:30 - 00:00 0.50 DRILL DRLG INTRM1
5/3/2004
00:00 - 12:00
12:00 - 00:00
5/4/2004
00:00 - 12:00
Start: 4/27/2004
Rig Release: 5/14/2004
Rig Number:
Spud Date: 4/28/2004
End: 5/14/2004
Group:
Printed: 6/23/2004 3:47:22 PM
)
')
Page 4 of 7
CohocoPhillipsAlaska
Operations ..Summary .Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD1-08
CD 1-08
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start: 4/27/2004
Rig Release: 5/14/2004
Rig Number:
Spud Date: 4/28/2004
End: 5/14/2004
Group:
Sub
Hours Code Code
12.00 DRILL DRLG INTRM1 Directionally drill 8 1/2" hole f/7802' to 9360' 5449' TVD
ADT-7.87 hrs.
WOB 15/20K RPM=150 GPM 630 @ 3480 psi
String wt. PU 225 SO=125 ROT =160
Torque onloff btm-14,500/13,500 ft. Ibs
ECD maintaining @ approx. 10.6
12.00 DRILL DRLG INTRM1 Directionally drill 8 1/2" hole f/9360' to 10,858' MD - 6242' TVD
ATD - 7.23 hrs.
WOB 10/20 k RPM 150 GPM 630 @ 4050 psi
String wt. PU 235 SO 135 Rot. 170
Torque on/off btm. - 17,000 115,500 ft. Ibs.
ECD - 10.6 to 10.8
12.00 DRILL DRLG INTRM1 Directionally drill 8 1/2" hole fl 10,858' to 12080' MD - 6831' TVD
ADT - 8.25 hrs.
WOB 20/25 k RPM 150 GPM 588 @ 3940 psi
String wt. PU 245 SO 135 Rot. 175
Torque onloff btm. - 16,500/16,000 ft. Ibs.
ECD running @ approx. 10.7
4.50 DRILL DRLG INTRM1 Directionally drill 8 1/2" hole wi Geo-pilot f/12,080' to 12,525' MD -
6928' TVD
ADT - 3.47 hrs. TO of 8 1/2" section
WOB 15/20 k RPM 150 GPM 571 @ 3900 psi
String wt. PU 245 SO 130 Rot 175
Torque on/off btm - 17,000/16,500 ft. Ibs.
ECD - 10.6 to 10.8
Top of Alpine C 12,415' MD 6918' TVD
Pump hi-vis sweep & circulate hole clean for wiper trip (2X btms up
after sweep) - 558 gpm @ 3710 psi wi 150 rpm - std back 1 std. every
30 mins. - to 12,146'
Flow check (static) Wiper trip fl 12,146' to 11,144' - Pumping 400 gpm
@ 2090 pis wi no rotation - no tight spots
Circulate hole clean f/11 ,144' - 588 gpm @ 3880 psi wi 150 RPM
RIH fl 11 ,144' to 12,481' - hole slick going in hole
Establish circulation - wash & ream f/12,481' to 12,525'
Pump hi-vis sweep & circulate hole clean for trip - 577 gpm @ 3800 psi
wi 150 rpm
POOH f/12,525' to 11,050' - spotting lub. pill @ 252 gpm @ 1000 psi -
no rotation -
Flow check (static) - blow down TO
POOH on Trip Tank f/11 ,050' to 9620' - correct hole fill - no tight spots
- Monitor well - static - pump dry job - Blow down TO
POOH fl 9620' to shoe @ 3408' - correct hole fill - no tight spots -
Monitor well - static. Cont'd POOH to HWDP @ 640', monitor well-
static.
UD gamma ray, SIB HWDP and UD NM flex collars, plugged in and
service geo pilot.
LD short bails - PU stack washer & flush stack - Pull wear bushing
Set test plug - change top pipe rams to 7" - PU Frank's fill up tool
Test 7" rams to 250 & 5000 psi - Pull test plug - set thin wall wear
bushing
Finish rigging up to run casing - Held PJSM
Run 7" 26# L-80 MBTC casing as follows: FS (Ray Oil Tools Silver
bullet) 2 jts. - FC (Weatherford) 2 jts - fill pipe & check floats (1 st 4
5/4/2004
12:00 - 00:00
5/5/2004
00:00 - 12:00
12:00 - 00:00
5/6/2004
00:00 - 04:30
04:30 - 08:00 3.50 DRILL CIRC INTRM1
08:00 - 09:30 1.50 DRILL WIPR INTRM1
09:30 - 10:45 1.25 DRILL CIRC INTRM1
1 0:45 - 11 :30 0.75 DRILL TRIP INTRM1
11 :30 - 12:00 0.50 DRILL REAM INTRM1
12:00 - 14:00 2.00 DRILL CIRC INTRM1
14:00 - 16:00 2.00 DRILL TRIP INTRM1
16:00 - 17:00 1.00 DRILL TRIP INTRM1
17:00 - 21 :00 4.00 DRILL TRIP INTRM1
21 :00 - 00:00 3.00 DRILL PULD INTRM1
Sfi 12004 00:00 - 01 :00 1.00 CASE RURD INTRM1
01 :00 - 02:00 1.00 CASE RURD INTRM1
02:00 - 03:00 1.00 CASE RURD INTRM1
03:00 - 04:00 1.00 CASE RURD INTRM1
04:00 - 08:00 4.00 CASE RUNC INTRM1
Description of Operations
Printed: 6/23/2004 3:47:22 PM
)
)
GpnocoPhillips Alaska
Operatior1s Summary Report
Legal Well Name: CD1-08
Common Well Name: CD 1-08
Event Name: ROT - DRILLING
Contractor Name: Doyon Drilling Inc
Rig Name: Doyon 19
Date From - To Hours Code Sub Phase
Code
5/7/2004 04:00 - 08:00 4.00 CASE RUNC INTRM1
08:00 - 08:30 0.50 CASE CIRC INTRM1
08:30 - 09:45 1.25 CASE OTHR INTRM1
09:45 - 14:00 4.25 CASE RUNC INTRM1
14:00 - 15:00 1.00 CASE CIRC INTRM1
15:00 - 18:30 3.50 CASE RUNC INTRM1
18:30 - 20:00 1.50 CASE CIRC INTRM1
20:00 - 21 :00 1.00 CASE RUNC INTRM1
21 :00 - 22:00 1.00 CEMEN INTRM1
22:00 - 00:00 2.00 CEMEN INTRM1
5/8/2004 00:00 - 03:00 3.00 CEMEN PUMP INTRM1
03:00 - 04:00 1.00 CEMEN OTHR INTRM1
04:00 - 04:30 0.50 CEMEN RURD INTRM1
04:30 - 05:30 1.00 DRILL OTHR INTRM1
05:30 - 06:30 1.00 WELCT EaRP INTRM1
06:30 - 12:00 5.50 WELCT BOPE INTRM1
12:00 - 13:30 1.50 DRILL RIRD INTRM1
13:30 - 16:30 3.00 DRILL PULD INTRM1
16:30 - 20:30 4.00 DRILL TRIP INTRM1
20:30 - 00:00 3.50 DRILL TRIP INTRM1
5/9/2004 00:00 - 01 :15 1.25 DRILL TRIP INTRM1
01:15 - 01:30 0.25 DRILL REAM INTRM1
01 :30 - 02:30 1.00 RIGMNT RSRV INTRM1
02:30 - 04:45 2.25 CEMEN DSHO INTRM1
04:45 - 05:00 0.25 DRILL DRLG INTRM1
05:00 - 07:00 2.00 DRILL CIRC INTRM1
07:00 - 07:45 0.75 DRILL FIT INTRM1
07:45 - 10:30 2.75 DRILL CIRC PROD
Page 50f?
Start: 4/27/2004
Rig Release: 5/14/2004
Rig Number:
Spud Date: 4/28/2004
End: 5/14/2004
Group:
connections made up wi BakerLoc) Note - Tore packer cup on fill up
tool while stabbing in to check floats - Continue running casing ran total
of 80 jts. to 3387'
Establish circulation & circ casing volume (130 bbls) @ 5 bpm 350 psi
Change out Frank's fill up tool
Continue running 7" 26# L-80 MBTC casing fl 3387' to 7205' ( 170 jts.
total)
Establish circulation & circulate btms up + @ 5 BPM @ 570 psi ICP to
500 psi FCP - PU wt. 200 SO 150
Continue running 7" 26# L-80 MBTC casing f/7205' to 11,044' (260 jts.
total)
Establish circulation & circulate btms up+ @ 5.2 BPM - FCP 630 psi.
PUW=315K SOW=150K
Cont'd to RIH with casing from 11044'-12515'.(294 jts. total) PU hanger
& landing jt. -land 7" on FMC fluted hangerwl shoe @ 12,515' & FC @
12,427'
RID slips and Frank's fill up tool, R/U cement head.
Circ'd @ 3 BPM - ICP 650 psi. Attempted to reciprocate pipe, P/U to
375K four times with no movement. Re-Ianded casing and continued to
circulate.
PJSM- Cement 7" casing as follows: Pump 10 bbls CW-100 @ 8.3 ppg
- Test lines to 3500 psi - valve on standpipe manifold leaking - repair &
retest - pumped 70 bbls CW-100 @ 8.3 ppg - 4 BPM @ 640 psi-
Pumped 20 bbls Mud Push XL @ 10.5 ppg @ 4BPM @ 630 psi -
Dropped btm plug - Mixed & pumped 53 bbls lead slurry (LiteCrete wi
additives) @ 11.0 ppg @ 4.5 BPM @ 675 psi - Mixed & pumped 22 bbls
tatil slurry (Class G wi additives) @ 15.8 ppg @ 4.5 BPM @ 560 psi -
Dropped top plug wi 20 bbls water fl Dowell - Switch over to rig pumps
& displaced cement wi 452 bbls 9.8 ppg @ 5 BPM @ 500 top 660 psi -
Bumped plug w/1100 psi - Floats held - CIP @ 0251 hrs. - Full returns
through out job
RU & test 7" casing to 3500 psi for 30 mins.
RD cement lines & head - LD landing jt. & casing elevators
Pull thin wall wear bushing - Install pack off & test to 5000 psi
Change top pipe rams f/7" to 3 1/2" X 6" VBR
RU to test BOPE - PJSM - Test BOPE to 250 psi & 5000 psi - Hydril to
250 & 3500 - repaired manual valve on kill line & retest - Test witnessed
& approved by Chuck Scheve AOGCC - RD (PU drilling bails & DP
elevators while repairing valve)
Blew down, pulled test plug, set wear ring, C/O saver sub.
UD 5" HWDP in mouse hole. M/U 6-1/8" BHA.
Singled in hole from 375' to 4385', filled pipe @ 2000' intervals.
TI H from derrick 4385' to 8700'.
Continue RIH f/8700' to 12,345' - String took wt.
Wash & ream f/12,345' to 12,399' - 5.2BPM @ 2150 psi wi 60 rpm
Slip & cut drill line 60'
Clean out cmt - wiper plugs - FC @ 12,427' - cmt - FS @ 12,513' -
clean out rat hole to 12,525'
Drill 20' new hole fl 12,525' to 12,545' MD 6929' TVD - ADT - .14 hrs.
Circulate hole clean for FIT @ 5.2 BPM @ 1950 psi wi 60 RPM
RU & perform FIT to 12.5 ppg EMW - 975 psi surface pressure wi 9.8
ppg mud @ 6927' TVD - RD
Change well over to 8.8 ppg OBM @ 5 BPM @ 1890 psi wi 60 RPM -
Printed: 6/23/2004 3:47:22 PM
)
)
CqnocoPhillips Alaska
Operations Summary Report
Legal Well Name: CD 1-08
Common Well Name: CD1-08
Event Name: ROT - DRILLING
Contractor Name: Doyon Drilling Inc
Rig Name: Doyon 19
Code Sub Phase
Code
5/9/2004 07:45 - 10:30 2.75 DRILL CIRC PROD
10:30 - 12:00 1.50 DRILL DRLH PROD
12:00 - 00:00
12.00 DRILL DRLH PROD
5/10/2004
12.00 DRILL DRLH PROD
00:00 - 12:00
12:00 - 00:00
12.00 DRILL DRLH PROD
5/11/2004
12.00 DRILL DRLH PROD
00:00 - 12:00
12:00 - 16:30
4.50 DRILL DRLH PROD
16:30 - 19:00 2.50 DRI LL CIRC PROD
19:00 - 00:00 5.00 DRILL TRIP PROD
5/12/2004 00:00 - 00:30 0.50 DRILL TRIP PROD
00:30 - 01 :30 1.00 DRILL CIRC PROD
01 :30 - 08:00 6.50 DRILL TRIP PROD
08:00 - 12:00 4.00 DRILL TRIP PROD
12:00 - 15:00 3.00 DRILL TRIP PROD
15:00 - 17:30 2.50 DRILL TRIP PROD
17:30 - 18:00 0.50 CMPL TN RURD CMPL TN
18:00 - 19:00 1.00 CMPL TN RURD CMPL TN
Page 6 of 7
Start: 4/27/2004
Rig Release: 5/14/2004
Rig Number:
Spud Date: 4/28/2004
End: 5/14/2004
Group:
Description öf· Operations
Shut down & monitor well (static) - clean surface equipment in pits -
Obtain SPR
Drill 6 1/8" horizontal section f/12,545' to 12,626' MD 6933' TVD
ADT - .77 hrs. = ART .48 hrs. AST .29 hrs.
WOB 6/10 k RPM 60/90 GPM 220 @ 2420 psi
String wt. PU 240 SO 125 Rot 175
Torque onloff btm - 16,000/15,500 ft. Ibs.
ECD - 10.6
Drill 6 1/8" horizontal section f/12,626' to 13,354' MD 6949' TVD
ADT -8.15 hrs. = ART 6.76 hrs. AST 1.39 hrs.
WOB 5/9 k RPM 100 GPM 220 @ 3150 psi
String wt. PU 240 SO 120 Rot 140
Torque on/off btm - 16,000/16,000 ft. Ibs.
Dri1l61/8" horizontal section f/13,354' to 14,213' MD 6938' TVD
ADT - 9.94 hrs. = ART - 7.68 hrs. AST - 1.26 hrs.
WOB - 3/10 k RPM - 0/100 GPM 220 @ 3270 psi
String wt. PU 240 SO 120 Rot 168
Torque on/off btm. - 16,000/ 16,500 ft. Ibs.
ECD - 10.6 to 10. 8
Drill 6 1/8" horizontal section f/14,213' to 14,978' MD 6939' TVD ADT
- 8.4 hrs. ART = 7.48 hrs. AST = 0.92 hrs.
WOB - 3/7 k RPM 0/100 GPM 220 @ 3250 psi.
String wt. PU 250 SO 115 Rot 160
Torque on/off btm 16,500/16,000 ftllbs
ECD - 10.7 - 11.0 ppg
Drill 6 1/8" horizontal section f/14,978' to 15,550' MD 6945' TVD
ADT - 6.83 hrs. = ART - 4.59 hrs. AST - 2.24 hrs.
WOB - 3/8 k RPM - 0/100 GPM 220 @ 3400 psi
String wt. PU 260 SO 115 Rot 165
Torque onloff btm. - 17,500/17,500 ft. Ibs.
ECD - 11.0 to 11.1 ppg
Drill 6 1/8" horizontal section f/ 15,550' to 15837' MD - 6938' TVD
ADT - 3.54 hrs. = ART - 2.46 hrs. AST - 1.08 hrs.
WOB - 4/8 k RPM - 0/100 GPM 220 @ 3300 psi
String wt. PU 255 SO 110 Rot 160
Torque onloff btm. - 17,500/17,500 ft. Ibs.
ECD - 10.9 to 11.2 ppg
Circulated Sweep @ 220 GPM. 3400 PSI.
POOH with pump @ 4 BPM and 40 RPM to 12,960'.
Pump out from 12960' to 12500',4 BPM 140 RPM. Flow check well,
static.
Circ and cond mud 5.2 bpm 12780 psi 1100 rpm.
Flow check well, static. Attempt to POOH on trip tank - swabbing. Pump
out from 12500' to 6576' - 4 bpm.
Flow check well, static. Attempt to POOH on trip tank - swabbing. Pump
out from 6576' to 2900' @ 4 bpm. Flow check well, static.
Attempted to pull pipe without pumps, swabbing. Continue to pump out
from 2900' to 1135'. Flow check well, static.
POOH on trip tank - Laid down BHA.
Pulled wear bushing.
Rigged up to run tubing. PJSM.
Printed: 6/23/2004 3:47:22 PM
)
ConocoPh iIIips.Alaska
Operations Summary Report
Pagra 7 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Start: 4/27/2004
Rig Release: 5/14/2004
Rig Number:
Spud Date: 4/28/2004
End: 5/14/2004
Group:
5/12/2004 19:00 - 00:00 5.00 CMPL TN RUNT CMPL TN Pick up and ran 31/2" Completion string to 4,050'.
5/13/2004 00:00 - 05:00 5.00 CMPL TN RUNT CMPL TN Pick up and ran 3 1/2" Completion string from 4,050' to 9,522'.
05:00 - 06:00 1.00 CMPL TN PULD CMPL TN Picked up SSSV and rigged up control line.
06:00 - 10:00 4.00 CMPL TN RURD CMPL TN Pick up and ran 31/2" Completion string w/controlline to 11,720'.
10:00 - 12:00 2.00 CMPL TN PULD CMPL TN Rigged up to run 41/2" tubing. Ran 2 Jts. 4 1/2" and made up tubing
hanger. Landed tubing.
12:00 - 13:30 1.50 CMPL TN RURD CMPL TN Ran in lock down screws and installed 2 way check valve. Made up
landing Jt. B and tested seals.
13:30 - 17:30 4.00 CMPL TN NUND CMPL TN Nippled down BOP, Installed control line to well head and nippled up
Xmas Tree. Tested tree to 5000 PSI. "
17:30 - 18:00 0.50 CMPL TN OTHR CMPL TN Pulled 2 way check valve.
18:00 - 18:30 0.50 CMPL TN RURD CMPL TN Rigged up displacement manifold and lines.
18:30 - 20:00 1.50 CMPL TN PCKR CMPL TN Tested lines to 3750 PSI. Set packer with 3500 PSI and held for 30
Min.
20:00 - 21 :00 1.00 CMPL TN DEOT CMPL TN Bled tubing to 2500 PSI and tested Annulus to 3500 PSI for 30 Min.
Bled both sides to 0 PSI.
21 :00 - 23:30 2.50 CMPLTN CIRC CMPL TN Pressured up Annulus to 3000 PSI and sheared valve in sliding sleeve.
Displaced 9 Bbls of Mineral Oil down tubing and tubing plugged. Bled
off pressure and pumped in annulus with out problem. Switched back to
tubing and displaced 25 Bbls MO followed by 321 Bbls. diesel @ 3 to 4
BPM. Returns were out running displacement by 12 Bbls. Adjusted
choke to increase tubing pressure. Pressure increased to 2000 PSI
opened choke. Tubing pressured up to 2500 PSI. Pressure bled to
1750 PSI and held. Bled tubing pressure to 700 PSI (Well Pressure)
and pumped 2 Bbls in to annulus to back flush. Switched back to tubing
and pressured up to 2500 PSI after 2.2 Bbls. Shut down pump and
pressure bled to 2200 PSI and held. Suspended displacement.
Pressure left on tubing 650 PSI. well will flow. Displacement short by 64
Bbls. (If 12 Bbls of oil entered well bore displacement would be 52 Bbls
short. The diesel should migrate above the MOBM so freeze protection
would not be an issue.).
23:30 - 00:00 0.50 CMPL TN OTHR CMPL TN Sucked out lines with Vac truck.
5/14/2004 00:00 - 01 :15 1.25 CMPL TN NUND CMPL TN Blow down lines - RD hard lines and floor manifold.
01:15-03:30 2.25 DRILL PULD CMPL TN Lay down drill pipe from derrick.
03:30 - 04:00 0.50 CMPL TN OTHR CMPL TN RU lubricator and install BP valve in tubing hanger, RD lubricator.
04:00 - 17:30 13.50 DRILL PULD CMPL TN Lay down drill pipe from derrick - total of 543 jts 4" dp - 6 jts hwdp - (3)
4 3/4" NMDC's.
17:30 - 21 :00 3.50 DRILL OTHR CMPL TN Cleaned MOBM from floor, pipe rack, and drip pans.
Released rig to move @ 2100 Hrs 5/14/04.
Printed: 6/23/2004 3:47:22 PM
.
.
a~"r-·~
25-May-04
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well CD1-08
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF
files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
15,837.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Date 1 L ÅA\-1'-« Signed~.J 0)1.;
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
) ~f..(... ~f "
Halliburton Sperry-Sun
Alaska North Slope
North Slope, Alaska
Alpine CD-1
CD1-0B
-
Job No. AKZZ3041097, Surveyed: 11 May, 2004
Survey Report
21 May, 2004
Your Ref: API 501032048900
Surface Coordinates: 5975855.21 N, 385950.60 E (70020' 34.4256" N, 150055' 32.2883" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
",,-"..J -
Surface Coordinates relative to Project H Reference: 975855.21 N, 114049.40 W (Grid)
Surface Coordinates relative to Structure: 974007.19 N, 128882.33 W (True)
Kelly Bushing Elevation: 55.60ft above Mean Sea Level
Kelly Bushing Elevation: 55.60ft above Project V Reference
Kelly Bushing Elevation: 55. 60ft above Structure
spe............y-sufl
DRIL-LING SERVices
A Halliburton Company
Survey Ref: svy394
Halliburton Sperry-Sun
Survey Report for Alpine CD-1 - CD1-08
Your Ref: API 501032048900
Job No. AKZZ3041097, Surveyed: 11 May, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
0.00 0.000 0.000 -55.60 0.00 O.OON 0.00 E 5975855.21 N 385950.60 E 0.00 CB-SS-Gyro
80.00 0.400 186.000 24.40 80.00 0.28S 0.03W 5975854.93 N 385950.57 E 0.500 0.15
170.00 0.500 138.000 114.40 170.00 0.88S 0.20 E 5975854.33 N 385950.79 E 0.419 0.71
260.00 1.500 101.000 204.38 259.98 1.40 S 1.62E 5975853.79 N 385952.20 E 1.268 2.14
351.00 3.450 112.000 295.29 350.89 2.65S 5.33 E 5975852.48 N 385955.89 E 2.196 5.81
439.00 7.300 121.000 382.89 438.49 6.52S 12.58 E 5975848.49 N 385963.08 E 4.465 13.88
527.00 10.100 122.000 469.87 525.47 13.49 S 23.92 E 5975841.35 N 385974.31 E 3.186 27.07 ~
615.00 13.400 123.000 556.01 611.61 23.14 S 39.02 E 5975831.48 N 385989.26 E 3.757 44.87 MWD+IIFR+MS+SAG
744.10 16.850 125.940 680.63 736.23 42.28 S 66.72 E 5975811.92 N 386016.67 E 2.737 78.44
835.69 20.040 128.380 767.50 823.10 59.81 S 89.78 E 5975794.04 N 386039.45 E 3.583 107.40
926.00 22.770 124.150 851.58 907.18 79.24 S 116.37 E 5975774.21 N 386065.76 E 3.471 140.29
1018.16 27.740 120.570 934.91 990.51 100.17 S 149.62 E 5975752.77 N 386098.68 E 5.639 179.30
1110.51 34.500 118.470 1013.92 1069.52 123.60 S 191.17 E 5975728.72 N 386139.87 E 7.413 226.32
1203.84 38.260 120.740 1089.05 1144.65 150.98 S 239.26 E 5975700.61 N 386187.54 E 4.279 280.91
1294.99 45.010 123.880 1157.15 1212.75 183.41 S 290.34 E 5975667.40 N 386238.12 E 7.749 341.01
1386.19 44.860 125.200 1221.71 1277.31 219.93 S 343.40 E 5975630.08 N 386290.61 E 1.035 405.22
1481.04 47.870 124.660 1287.16 1342.76 259.23 S 399.68 E 5975589.93 N 386346.29 E 3.200 473.68
1573.91 52.050 123.400 1346.89 1402.49 298.99 S 458.60 E 5975549.28 N 386404.60 E 4.619 544.48
1665.56 55.880 122.410 1400.80 1456.40 339.23 S 520.82 E 5975508.10 N 386466.20 E 4.269 618.15
1760.49 59.800 119.940 1451.32 1506.92 380.78 S 589.58 E 5975465.50 N 386534.32 E 4.680 697.72
1853.54 60.640 117.650 1497.54 1553.14 419.67 S 660.35 E 5975425.54 N 386604.49 E 2.319 777.17
1944.67 59.510 116.830 1543.00 1598.60 455.83 S 730.57 E 5975388.32 N 386674.15 E 1.465 854.47
2037.88 58.710 117.170 1590.85 1646.45 492.14 S 801.84 E 5975350.93 N 386744.86 E 0.914 932.69
2131.93 58.730 116.660 1639.69 1695.29 528.52 S 873.51 E 5975313.46 N 386815.97 E 0.464 1011.26
2223.68 58.780 116.640 1687.28 1742.88 563.71 S 943.62 E 5975277.21 N 386885.53 E 0.058 1087.86 --
2317.54 59.580 116.640 1735.37 1790.97 599.85 S 1015.66 E 5975239.98 N 386957.02 E 0.852 1166.57
2411.12 59.880 116.530 1782.54 1838.14 636.02 S 1087.94 E 5975202.71 N 387028.74 E 0.336 1245.48
2504.75 59.070 116.590 1830.09 1885.69 672.08 S 1160.08 E 5975165.56 N 387100.32 E 0.867 1324.22
2596.26 58.430 116.080 1877.57 1933.17 706.79 S 1230.19 E 5975129.79 N 387169.90 E 0.846 1400.52
2690.32 58.720 116.620 1926.61 1982.21 742.41 S 1302.12 E 5975093.07 N 387241.27 E 0.579 1478.81
2784.50 60.390 118.820 1974.33 2029.93 780.19 S 1373.98 E 5975054.21 N 387312.55 E 2.683 1558.41
2877.98 60.200 119.620 2020.66 2076.26 819.83 S 1444.84 E 5975013.50 N 387382.80 E 0.771 1638.40
2970.49 60.570 119.600 2066.37 2121.97 859.56 S 1514.76 E 5974972.70 N 387452.11 E 0.400 1717.73
3063.68 60.580 118.770 2112.15 2167.75 899.14 S 1585.63 E 5974932.05 N 387522.36 E 0.776 1797.69
3156.81 59.290 118.390 2158.81 2214.41 937.70 S 1656.40 E 5974892.42 N 387592.54 E 1.429 1876.94
21 May, 2004 - 10:41 Page 2 of7 Dri/lQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-1 - CD1-08
Your Ref: API 501032048900
Job No. AKZZ3041097, Surveyed: 11 May, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
3250.11 59.140 117.330 2206.56 2262.16 975.16 S 1727.26 E 5974853.89 N 387662.83 E 0.989 1955.56
3341.79 59.270 116.920 2253.50 2309.10 1011.06S 1797.35 E 5974816.92 N 387732.37 E 0.409 2032.61
3368.58 59.440 116.680 2267.16 2322.76 1021.46 S 1817.93 E 5974806.22 N 387752.78 E 0.998 2055.13
3439.45 59.340 115.150 2303.24 2358.84 1048.11 S 1872.79 E 5974778.73 N 387807.22 E 1.863 2114.52
3534.50 58.830 115.430 2352.08 2407.68 1082.95 S 1946.52 E 5974742.77 N 387880.42 E 0.593 2193.71
'-'
3630.06 58.350 115.420 2401.88 2457.48 1117.96S 2020.17 E 5974706.64 N 387953.53 E 0.502 2272.96
3725.53 58.220 116.460 2452.07 2507.67 1153.49 S 2093.20 E 5974670.01 N 388026.01 E 0.937 2352.05
3820.74 57.980 117.040 2502.38 2557.98 1189.87 S 2165.38 E 5974632.54 N 388097.63 E 0.575 2431.01
3916.46 57.450 117.630 2553.51 2609.11 1227.02 S 2237.27 E 5974594.29 N 388168.94 E 0.760 2510.24
4012.10 56.580 117.480 2605.58 2661.18 1264.14 S 2308.39 E 5974556.10 N 388239.49 E 0.919 2588.85
4107.70 55.870 118.080 2658.72 2714.32 1301.17S 2378.70 E 5974518.00 N 388309.23 E 0.908 2666.77
4202.78 55.150 118.050 2712.56 2768.16 1338.04 S 2447.85 E 5974480.08 N 388377.81 E 0.758 2743.69
4298.50 55.000 118.710 2767.36 2822.96 1375.34 S 2516.90 E 5974441.74 N 388446.28 E 0.587 2820.81
4394.24 54.850 119.660 2822.38 2877.98 1413.55 S 2585.31 E 5974402.49 N 388514.10 E 0.827 2897.99
4489.77 54.950 119.740 2877.31 2932.91 1452.27 S 2653.20 E 5974362.74 N 388581.39 E 0.125 2975.11
4585.61 54.770 120.060 2932.48 2988.08 1491.34 S 2721.14E 5974322.64 N 388648.73 E 0.331 3052.48
4679.94 54.580 120.050 2987.02 3042.62 1529.89 S 2787.75 E 5974283.09 N 388714.75 E 0.202 3128.49
4775.63 55.960 118.390 3041.53 3097.13 1568.27 S 2856.39 E 5974243.67 N 388782.80 E 2.028 3205.96
4871.09 57.470 115.740 3093.93 3149.53 1604.55 S 2927.44 E 5974206.31 N 388853.29 E 2.808 3283.99
4966.59 58.880 115.040 3144.29 3199.89 1639.34 S 3000.75 E 5974170.41 N 388926.06 E 1.602 3362.83
5062.30 59.600 115.270 3193.24 3248.84 1674.30 S 3075.19 E 5974134.32 N 388999.96 E 0.780 3442.66
5157.56 61.790 114.490 3239.86 3295.46 1709.24 S 3150.55 E 5974098.23 N 389074.78 E 2.407 3523.18
5253.20 62.050 114.930 3284.88 3340.48 1744.52 S 3227.20 E 5974061.80 N 389150.89 E 0.489 3604.92 -"
5348.68 61.830 114.560 3329.79 3385.39 1779.78 S 3303.72 E 5974025.37 N 389226.86 E 0.412 3686.55
5444.08 61.650 115.950 3374.96 3430.56 1815.63 S 3379.72 E 5973988.37 N 389302.30 E 1.297 3768.15
5539.62 61.980 116.050 3420.09 3475.69 1852.55 S 3455.41 E 5973950.31 N 389377.42 E 0.358 3850.17
5635.43 61.720 116.280 3465.29 3520.89 1889.80 S 3531.23 E 5973911.91 N 389452.67 E 0.344 3932.51
5730.79 61.550 116.460 3510.59 3566.19 1927.07 S 3606.41 E 5973873.50 N 389527.27 E 0.244 4014.37
5826.20 61.500 116.550 3556.08 3611.68 1964.50 S 3681.46 E 5973834.93 N 389601.75 E 0.098 4096.22
5921.52 61.710 117.780 3601.41 3657.01 2002.78 S 3756.06 E 5973795.52 N 389675.76 E 1.156 4178.27
6017.15 61.090 118.300 3647.19 3702.79 2042.25 S 3830.17 E 5973754.93 N 389749.25 E 0.805 4260.67
6112.29 61.060 118.770 3693.21 3748.81 2082.03 S 3903.32 E 5973714.04 N 389821.79 E 0.434 4342.54
6208.23 61.080 117.580 3739.62 3795.22 2121.67 S 3977.34 E 5973673.27 N 389895.20 E 1.086 4424.99
6303.41 60.280 115.600 3786.23 3841.83 2158.82 S 4051.54 E 5973635.00 N 389968.83 E 1.999 4506.01
6398.50 58.550 113.670 3834.62 3890.22 2192.95 S 4125.94 E 5973599.74 N 390042.70 E 2.522 4585.27
21 May, 2004 - 10:41 Page 3 of7 DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-1 - CD1-08
Your Ref: API 501032048900
Job No. AKZZ3041097, Surveyed: 11 May, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6493.52 58.280 115.560 3884.39 3939.99 2226.66 S 4199.52 E 5973564.92 N 390115.76 E 1.718 4663.64
6588.55 58.370 116.630 3934.29 3989.89 2262.23 S 4272.15 E 5973528.24 N 390187.84 E 0.963 4742.45
6683.86 58.610 117.140 3984.10 4039.70 2298.98 S 4344.62 E 5973490.40 N 390259.74 E 0.521 4821.87
6779.51 58.120 118.120 4034.27 4089.87 2336.74 S 4416.77 E 5973451.54 N 390331.31 E 1.012 4901.69
6875.02 58.440 118.060 4084.49 4140.09 23--75.00 S 4488.44 E 5973412.20 N 390402.39 E 0.339 4981.44
'-
6970.25 58.410 118.430 4134.35 4189.95 2413.39 S 4559.92 E 5973372.73 N 390473.27 E 0.333 5061.12
7065.86 58.320 116.810 4184.50 4240.10 2451.13 S 4632.04 E 5973333.89 N 390544.81 E 1.446 5140.90
7161.02 57.870 116.830 4234.80 4290.40 2487.58 S 4704.13 E 5973296.35 N 390616.34 E 0.473 5219.84
7256.38 58.210 116.860 4285.27 4340.87 2524.11 S 4776.32 E 5973258.72 N 390687.96 E 0.358 5298.91
7351.54 58.300 117.180 4335.34 4390.94 2560.88 S 4848.41 E 5973220.87 N 390759.49 E 0.301 5378.05
7447.42 58.140 116.590 4385.84 4441.44 2597.73 S 4921.10 E 5973182.91 N 390831.61 E 0.549 5457.71
7542.96 58.430 116.120 4436.06 4491.66 2633.81 S 4993.93 E 5973145.73 N 390903.88 E 0.517 5536.99
7638.30 58.630 115.180 4485.83 4541.43 2669.01 S 5067.23 E 5973109.42 N 390976.64 E 0.867 5616.08
7733.71 58.610 115.070 4535.51 4591.11 2703.60 S 5140.98 E 5973073.71 N 391049.85 E 0.101 5695.13
7829.10 58.330 116.170 4585.40 4641.00 2738.75 S 5214.29 E 5973037.45 N 391122.62 E 1.026 5774.20
7924.48 57.940 116.530 4635.75 4691.35 2774.71 S 5286.88 E 5973000.39 N 391194.66 E 0.520 5853.22
8019.98 58.350 116.050 4686.16 4741.76 2810.63 S 5359.61 E 5972963.36 N 391266.83 E 0.605 5932.32
8115.48 58.000 117.050 4736.52 4792.12 2846.90 S 5432.19 E 5972926.00 N 391338.85 E 0.962 6011.53
8210.89 58.100 118.150 4787.01 4842.61 2884.41 S 5503.93 E 5972887.40 N 391410.01 E 0.984 6090.86
8306.17 58.330 117.460 4837.19 4892.79 2922.18 S 5575.57 E 5972848.54 N 391481.07 E 0.661 6170.29
8401.86 58.320 117.790 4887.44 4943.04 2959.95 S 5647.72 E 5972809.69 N 391552.64 E 0.294 6250.10
8497.16 58.310 118.390 4937.50 4993.10 2998.13 S 5719.27 E 5972770.42 N 391623.59 E 0.536 6329.71
8593.20 57.990 118.080 4988.18 5043.78 3036.72 S 5791.14 E 5972730.73 N 391694.87 E 0.432 6409.83 -'
8688.62 57.510 118.460 5039.09 5094.69 3074.94 S 5862.21 E 5972691.44 N 391765.35 E 0.605 6489.10
8784.15 57.420 118.290 5090.47 5146.07 3113.22 S 5933.08 E 5972652.09 N 391835.63 E 0.177 6568.24
8879.43 57.550 118.330 5141.69 5197.29 3151.32 S 6003.81 E 5972612.91 N 391905.77 E 0.141 6647.17
8975.14 57.510 119.190 5193.07 5248.67 3190.17 S 6074.60 E 5972572.99 N 391975.96 E 0.759 6726.61
9070.67 57.730 119.360 5244.23 5299.83 3229.62 S 6144.97 E 5972532.47 N 392045.72 E 0.275 6806.10
9166.19 57.970 118.670 5295.06 5350.66 3268.85 S 6215.69 E 5972492.18 N 392115.84 E 0.661 6885.73
9261.33 57.960 117.770 5345.53 5401.13 3306.99 S 6286.76 E 5972452.96 N 392186.32 E 0.802 6964.94
9356.97 57.860 117.370 5396.34 5451.94 3344.49 S 6358.58 E 5972414.37 N 392257.57 E 0.369 7044.34
9452.42 58.220 115.500 5446.86 5502.46 3380.53 S 6431.09 E 5972377.23 N 392329.52 E 1.704 7123.35
9547.76 58.200 114.430 5497.09 5552.69 3414.74 S 6504.56 E 5972341.91 N 392402.45 E 0.954 7201.94
9643.45 57.810 114.810 5547.79 5603.39 3448.54 S 6578.33 E 5972306.99 N 392475.71 E 0.529 7280.52
9739.00 57.600 114.650 5598.84 5654.44 3482.33 S 6651.69 E 5972272.08 N 392548.55 E 0.261 7358.77
21 May, 2004 - 10:41 Page 4 of7 DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-1 - CD1-08
Your Ref: API 501032048900
Job No. AKZZ3041097, Surveyed: 11 May, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (It) (o/1ooft)
9834.28 58.160 115.290 5649.50 5705.10 3516.40 S 6724.85 E 5972236.91 N 392621.17 E 0.818 7437.03
9929.79 58.290 116.120 5699.80 5755.40 3551.62 S 6798.01 E 5972200.58 N 392693.79 E 0.751 7516.02
10025.45 58.390 116.760 5750.01 5805.61 3587.87 S 6870.91 E 5972163.22 N 392766.13 E 0.579 7595.47
10121.05 58.660 116.630 5799.92 5855.52 3624.50 S 6943.76 E 5972125.49 N 392838.41 E 0.305 7675.11
10216.52 58.670 117.320 5849.57 5905.17 3661.49 S 7016.43 E 5972087.40 N 392910.51 E 0.617 7754.84
'~j
10311.80 58.100 117.820 5899.52 5955.12 3699.04 S 7088.35 E 5972048.76 N 392981.86 E 0.747 7834.35
10407.50 58.110 118.280 5950.08 6005.68 3737.25 S 7160.06 E 5972009.46 N 393052.97 E 0.408 7914.10
10503.12 58.240 118.890 6000.50 6056.10 3776.12 S 7231.40 E 5971969.51 N 393123.72 E 0.559 7993.98
10598.70 58.270 118.020 6050.79 6106.39 3814.85 S 7302.86 E 5971929.70 N 393194.58 E 0.775 8073.87
10694.36 58.340 118.230 6101.05 6156.65 3853.22 S 7374.64 E 5971890.24 N 393265.77 E 0.201 8153.78
10789.93 58.030 118.700 6151.44 6207.04 3891.92 S 7446.04 E 5971850.46 N 393336.57 E 0.529 8233.60
10885.22 58.040 118.330 6201.88 6257.48 3930.52 S 7517.07 E 5971810.79 N 393407.00 E 0.330 8313.07
10980.81 58.310 118.630 6252.29 6307.89 3969.25 S 7588.46 E 5971770.98 N 393477.80 E 0.388 8392.90
11073.57 59.330 117.630 6300.31 6355.91 4006.66 S 7658.45 E 5971732.50 N 393547.21 E 1.435 8470.81
11171.87 59.420 117.570 6350.39 6405.99 4045.85 S 7733.41 E 5971692.18 N 393621.56 E 0.106 8553.71
11266.94 59.120 117.010 6398.97 6454.57 4083.32 S 7806.03 E 5971653.61 N 393693.61 E 0.597 8633.71
11362.76 57.360 115.500 6449.41 6505.01 4119.36 S 7879.09 E 5971616.46 N 393766.11 E 2.273 8713.14
11458.13 58.120 115.590 6500.31 6555.91 4154.14 S 7951.85 E 5971580.58 N 393838.34 E 0.801 8791.55
11553.46 58.600 116.530 6550.32 6605.92 4189.80 S 8024.76 E 5971543.81 N 393910.69 E 0.979 8870.62
11648.97 58.830 117.490 6599.92 6655.52 4226.86 S 8097.48 E 5971505.64 N 393982.84 E 0.892 8950.44
11744.42 60.390 119.680 6648.21 6703.81 4266.26 S 8169.76 E 5971465.15 N 394054.51 E 2.567 9031.39
11840.07 63.430 124.260 6693.26 6748.86 4310.96 S 8241.29 E 5971419.37 N 394125.35 E 5.285 9115.09
11935.80 66.810 128.430 6733.54 6789.14 4362.44 S 8311.18E 5971366.83 N 394194.45 E 5.298 9201.80 _J
12031.08 69.250 131.880 6769.20 6824.80 4419.42 S 8378.68 E 5971308.83 N 394261.08 E 4.223 9290.12
12126.56 72.820 136.020 6800.23 6855.83 4482.09 S 8443.64 E 5971245.18 N 394325.07 E 5.549 9380.05
12221.73 76.540 138.830 6825.38 6880.98 4549.68 S 8505.71 E 5971176.66 N 394386.11 E 4.836 9470.83
12317.31 79.640 141.640 6845.10 6900.70 4621.56 S 8565.50 E 5971103.88 N 394444.80 E 4.335 9562.57
12412.74 82.500 143.920 6859.92 6915.52 4696.62 S 8622.51 E 5971027.95 N 394500.66 E 3.815 9654.14
12454.81 83.630 144.130 6865.00 6920.60 4730.42 S 8647.04 E 5970993.79 N 394524.68 E 2.731 9694.49
12544.57 85.100 146.560 6873.81 6929.41 4803.89 S 8697.83 E 5970919.55 N 394574.34 E 3.153 9780.23
12640.39 88.070 148.550 6879.52 6935.12 4884.60 S 8749.13 E 5970838.07 N 394624.41 E 3.729 9870.93
12736.14 89.300 151.550 6881.72 6937.32 4967.53 S 8796.92 E 5970754.42 N 394670.93 E 3.385 9960.31
12831.44 89.980 153.030 6882.32 6937.92 5051.89 S 8841.23 E 5970669.39 N 394713.95 E 1.709 10047.89
12924.29 89.130 153.640 6883.04 6938.64 5134.87 S 8882.90 E 5970585.80 N 394754.35 E 1.127 10132.54
13022.72 89.560 154.130 6884.16 6939.76 5223.24 S 8926.22 E 5970496.77 N 394796.32 E 0.662 10221.88
21 May, 2004 - 10:41 Page 5 of 7 DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-1 - CD1-0B
Your Ref: API 501032048900
Job No. AKZZ3041097, Surveyed: 11 May, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1000)
13116.42 89.010 153.920 6885.33 6940.93 5307.47 S 8967.26 E 5970411.93 N 394836.07 E 0.628 10306.83
13213.48 88.200 153.800 6887.70 6943.30 5394.58 S 9010.00 E 5970324.19 N 394877.49 E 0.844 10394.93
13309.06 89.130 154.140 6889.92 6945.52 5480.44 S 9051.94 E 5970237.70 N 394918.11 E 1.036 10481.61
13404.44 89.810 154.710 6890.80 6946.40 5566.47 S 9093.11 E 5970151.05 N 394957.97 E 0.930 10567.80
13499.86 90.050 153.260 6890.92 6946.52 5652.22 S 9134.96 E 5970064.67 N 394998.51 E 1.540 10654.35
13593.59 90.420 153.340 6890.54 6946.14 5735.95 S 9177.07 E 5969980.31 N 395039.35 E 0.404 10739.83
13691.13 90.170 151.790 6890.03 6945.63 5822.52 S 9222.01 E 5969893.07 N 395082.96 E 1.610 10829.28 .----
13786.58 90.730 151.230 6889.29 6944.89 5906.40 S 9267.54 E 5969808.50 N 395127.21 E 0.830 10917.51
13880.87 91.410 151.650 6887.52 6943.12 5989.21 S 9312.61 E 5969725.02 N 395171.02 E 0.848 11004.69
13977.55 89.800 152.010 6886.50 6942.10 6074.43 S 9358.25 E 5969639.11 N 395215.35 E 1.706 11093.84
14073.09 90.730 153.360 6886.06 6941.66 6159.31 S 9402.09 E 5969553.57 N 395257.89 E 1.716 11181.38
14168.33 89.060 153.470 6886.24 6941.84 6244.48 S 9444.71 E 5969467.77 N 395299.21 E 1.757 11268.16
14264.09 88.520 150.400 6888.26 6943.86 6328.95 S 9489.74 E 5969382.62 N 395342.96 E 3.254 11356.37
14359.51 89.200 150.660 6890.16 6945.76 6412.01 S 9536.68 E 5969298.86 N 395388.63 E 0.763 11445.16
14455.22 89.810 150.910 6890.98 6946.58 6495.54 S 9583.39 E 5969214.63 N 395434.06 E 0.689 11534.08
14550.67 90.550 151.330 6890.68 6946.28 6579.11 S 9629.49 E 5969130.36 N 395478.89 E 0.891 11622.56
14645.76 91.160 151.380 6889.27 6944.87 6662.56 S 9675.07 E 5969046.23 N 395523.19 E 0.644 11710.54
14740.13 90.490 150.560 6887.91 6943.51 6745.06 S 9720.86 E 5968963.04 N 395567.72 E 1.122 11798.10
14836.81 90.980 150.820 6886.67 6942.27 6829.36 S 9768.18 E 5968878.04 N 395613.76 E 0.574 11887.97
14932.60 89.570 150.180 6886.21 6941.81 6912.72 S 9815.35 E 5968793.96 N 395659.65 E 1.616 11977.14
15027.89 89.190 150.900 6887.24 6942.84 6995.69 S 9862.21 E 5968710.29 N 395705.24 E 0.854 12065.82
15123.28 90.730 149.800 6887.30 6942.90 7078.58 S 9909.40 E 5968626.69 N 395751.16 E 1.984 12154.71
15218.93 91.170 150.370 6885.72 6941.32 7161.48S 9957.10 E 5968543.08 N 395797.59 E 0.753 12243.99
15314.12 91.220 150.780 6883.73 6939.33 7244.37 S 10003.85 E 5968459.48 N 395843.08 E 0.434 12332.54
15409.33 88.880 150.840 6883.65 6939.25 7327.48 S 10050.28 E 5968375.67 N 395888.24 E 2.459 12420.98 -
15504.78 91.100 150.370 6883.67 6939.27 7410.64 S 10097.13 E 5968291.82 N 395933.82 E 2.377 12509.77
15600.42 93.010 150.290 6880.24 6935.84 7493.68 S 10144.44 E 5968208.06 N 395979.86 E 1.999 12598.84
15695.95 90.420 151.490 6877.38 6932.98 7577.10 S 10190.89 E 5968123.95 N 396025.03 E 2.988 12687.48
15790.21 88.570 150.870 6878.21 6933.81 7659.68 S 10236.32 E 5968040.69 N 396069.21 E 2.070 12774.81
¿ 15837.00 88.570 150.870 6879.38 6934.98 ...... 7700.54 S 10259.09 E 5967999.49 N 396091.35 E 0.000 12818.25 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB 55.6' above MSL. Northings and Eastings are relative to 272 FNL, 2751' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from 272 FNL, 2751' FEL and calculated along an Azimuth of 129.080° (True).
21 May, 2004 - 10:41 Page 60f7 DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-1 - CD1-08
Your Ref: API 501032048900
Job No. AKZZ3041097, Surveyed: 11 May, 2004
North Slope, Alaska
Alaska North Slope
Based upon Minimum Curvature type calculations, at a Measured Depth of 15837.000.,
The Bottom Hole Displacement is 12827.60ft., in the Direction of 126.892° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
15837.00
6934.98
7700.54 S
10259.09 E Projected Survey
.-
Survey tool program for CD1-0B
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
615.00
0.00 615.00
611.61 15837.00
611.61 CB-SS-Gyro
6934.98 MWD+IIFR+MS+SAG
---
21 May, 2004 - 10:41
Page 7of7
DrillQuest 3.03.06.002
.
.
~l)q...-Dsr¡
25-May-04
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well CD1-08 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF
files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
15,837.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Date c¡ J- Áj¡¡'1 Signed W oúJ
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
~6lj~(j~'-cf
Halliburton Sperry-Sun
Alaska North Slope
North Slope, Alaska
Alpine CD-1
CD1-0B MWD
.
Job No. AKMW3041097, Surveyed: 11 May, 2004
Survey Report
21 May, 2004
Your Ref: API 501032048900
Surface Coordinates: 5975855.21 N, 385950.60 E (70' 20' 34.4256" N, 150' 55' 32.2883" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
.
Surface Coordinates relative to Project H Reference: 975855.21 N, 114049.40 W (Grid)
Surface Coordinates relative to Structure: 974007.19 N, 128882.33 W (True)
Kelly Bushing Elevation: 55. 60ft above Mean Sea Level
Kelly Bushing Elevation: 55. 60ft above Project V Reference
Kelly Bushing Elevation: 55. 60ft above Structure
.~
<þ
....ç
.
~
~
c;.
.L
I
C3
"'1
,..a
SpEf"'If"'IY-SUI'1
OFtIL.L.ING SEFt.VICES
A Halliburton Company
Survey Ref: svy404
Halliburton Sperry-Sun
Survey Report for Alpine CD-1 - CD1-0B MWD
Your Ref: API 501032048900
Job No. AKMW3041097, Surveyed: 11 May, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
0.00 0.000 0.000 -55.60 0.00 0.00 N 0.00 E 5975855.21 N 385950.60 E 0.00 CB-88-Gyro
80.00 0.400 186.000 24.40 80.00 0.288 0.03W 5975854.93 N 385950.57 E 0.500 0.15
170.00 0.500 138.000 114.40 170.00 0.888 0.20 E 5975854.33 N 385950.79 E 0.419 0.71
260.00 1.500 101.000 204.38 259.98 1.408 1.62 E 5975853.79 N 385952.20 E 1.268 2.14
351.00 3.450 112.000 295.29 350.89 2.658 5.33 E 5975852.48 N 385955.89 E 2.196 5.81 .
439.00 7.300 121.000 382.89 438.49 6.528 12.58 E 5975848.49 N 385963.08 E 4.465 13.88
527.00 10.100 122.000 469.87 525.47 13.49 8 23.92 E 5975841.35 N 385974.31 E 3.186 27.07
615.00 13.400 123.000 556.01 611 .61 23.148 39.02 E 5975831.48 N 385989.26 E 3.757 44.87 MWD Magnetic
744.10 17.070 126.330 680.56 736.16 42.52 8 66.84 E 5975811.68 N 386016.78 E 2.921 78.69
835.69 20.270 128.630 767.32 822.92 60.39 8 90.07 E 5975793.45 N 386039.74 E 3.584 107.99
926.00 23.000 124.440 851.26 906.86 80.148 116.85 E 5975773.30 N 386066.21 E 3.472 141.23
1018.16 27.980 120.750 934.43 990.03 101.398 150.30 E 5975751.54 N 386099.34 E 5.669 180.59
1110.51 34.760 118.640 1013.24 1068.84 125.128 192.07 E 5975727.19 N 386140.74 E 7.436 227.97
1203.84 38.540 120.730 1 088.11 1143.71 152.748 240.43 E 5975698.83 N 386188.68 E 4.265 282.93
1294.99 45.290 124.770 1155.91 1211.51 185.768 291.52 E 5975665.03 N 386239.26 E 7.972 343.40
1386.19 45.140 124.030 1220.15 1275.75 222.33 8 344.92 E 5975627.66 N 386292.10 E 0.599 407.91
1481.04 48.160 122.470 1285.26 1340.86 260.128 402.61 E 5975588.99 N 386349.20 E 3.401 476.51
1573.91 52.330 123.600 1344.64 1400.24 299.058 462.44 E 5975549.16 N 386408.43 E 4.586 547.50
1665.56 56.170 122.380 1398.18 1453.78 339.53 8 524.82 E 5975507.74 N 386470.19 E 4.327 621.44
1760.49 60.090 120.520 1448.29 1503.89 381.568 593.59 E 5975464.67 N 386538.32 E 4.452 701.32
1853.54 60.930 115.140 1494.12 1549.72 419.338 665.19 E 5975425.80 N 386609.33 E 5.113 780.71
1944.67 59.810 117.150 1539.18 1594.78 454.23 8 736.29 E 5975389.83 N 386679.90 E 2.277 857.91 .
2037.88 59.010 117.710 1586.61 1642.21 491.198 807.51 E 5975351.79 N 386750.54 E 1.002 936.49
2131.93 59.030 117.150 1635.03 1690.63 528.33 8 879.08 E 5975313.56 N 386821.54 E 0.511 1015.46
2223.68 59.070 117.720 1682.21 1737.81 564.59 8 948.91 E 5975276.25 N 386890.81 E 0.535 1092.53
2317.54 59.870 117.250 1729.89 1785.49 601.90 8 1020.64 E 5975237.85 N 386961.96 E 0.955 1171.73
2411.12 60.180 116.010 1776.65 1832.25 638.23 8 1093.10 E 5975200.42 N 387033.86 E 1.195 1250.88
2504.75 59.360 117.290 1823.79 1879.39 674.51 8 1165.40 E 5975163.05 N 387105.60 E 1.470 1329.88
2596.26 58.730 116.830 1870.86 1926.46 710.21 8 1235.28 E 5975126.29 N 387174.94 E 0.812 1406.63
2690.32 59.020 117.050 1919.48 1975.08 746.698 1307.07 E 5975088.72 N 387246.15 E 0.368 1485.35
2784.50 60.690 119.180 1966.78 2022.38 785.08 8 1378.88 E 5975049.24 N 387317.38 E 2.640 1565.30
2877.98 60.490 119.420 2012.68 2068.28 824.93 8 1449.90 E 5975008.32 N 387387.78 E 0.310 1645.55
2970.49 60.860 119.740 2057.99 2113.59 864.758 1520.04 E 5974967.44 N 387457.31 E 0.501 1725.10
3063.68 60.870 118.060 2103.36 2158.96 904.08 8 1591.30 E 5974927.02 N 387527.96 E 1.575 1805.21
3156.81 59.580 118.480 2149.61 2205.21 942.37 8 1662.49 E 5974887.66 N 387598.56 E 1.439 1884.61
21 May, 2004 - 10:20
Page 2of7
DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-1 - CD1-0B MWD
Your Ref: API 501032048900
Job No. AKMW3041097, Surveyed: 11 May, 2004
North Slope, Alaska
Alaska North Slope
Meåsured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3250.11 59.440 117.430 2196.95 2252.55 980.05 8 1733.51 E 5974848.90 N 387669.00 E 0.981 1963.50
3341.79 59.570 116.670 2243.47 2299.07 1015.988 1803.86 E 5974811.90N 387738.80 E 0.728 2040.76
3368.58 59.730 116.510 2257.01 2312.61 1026.33 8 1824.54 E 5974801.24 N 387759.31 E 0.789 2063.33
3439.45 59.530 115.150 2292.84 2348.44 1052.97 8 1879.57 E 5974773.77 N 387813.93 E 1.680 2122.84
3534.50 59.020 115.300 2341.41 2397.01 1087.798 1953.49 E 5974737.83 N 387887.31 E 0.553 2202.17 .
3630.06 58.550 115.860 2390.93 2446.53 1123.088 2027.20 E 5974701.42 N 387960.48 E 0.702 2281.64
3725.53 58.410 117.570 2440.84 2496.44 1159.668 2099.89 E 5974663.74 N 388032.61 E 1.534 2361.13
3820.74 58.180 117.430 2490.88 2546.48 1197.068 2171.74E 5974625.25 N 388103.88 E 0.272 2440.49
3916.46 57.640 117.680 2541.73 2597.33 1234.58 8 2243.64 E 5974586.64 N 388175.20 E 0.606 2519.95
4012.10 56.770 117.220 2593.53 2649.13 1271.64 8 2314.98 E 5974548.50 N 388245.97 E 0.995 2598.69
4107.70 56.060 118.400 2646.42 2702.02 1308.798 2385.42 E 5974510.28 N 388315.84 E 1.268 2676.79
4202.78 55.340 118.990 2700.00 2755.60 1346.50 8 2454.32 E 5974471.53 N 388384.15 E 0.914 2754.05
4298.50 55.190 117.580 2754.54 2810.14 1383.778 2523.59 E 5974433.20 N 388452.85 E 1.221 2831.32
4394.24 55.040 119.600 2809.30 2864.90 1421.358 2592.54 E 5974394.58 N 388521.22 E 1.738 2908.53
4489.77 55.140 119.650 2863.97 2919.57 1460.088 2660.64 E 5974354.82 N 388588.72 E 0.113 2985.81
4585.61 54.960 120.170 2918.87 2974.47 1499.258 2728.74 E 5974314.62 N 388656.21 E 0.483 3063.36
4679.94 54.770 119.260 2973.16 3028.76 1537.498 2795.73 E 5974275.37 N 388722.62 E 0.814 3139.47
4775.63 56.150 116.170 3027.42 3083.02 1574.128 2865.51 E 5974237.68 N 388791.83 E 3.026 3216.73
4871.09 57.660 113.480 3079.55 3135.15 1607.688 2938.08 E 5974203.02 N 388863.88 E 2.842 3294.22
4966.59 59.070 115.170 3129.64 3185.24 1641.178 3012.16 E 5974168.40 N 388937.45 E 2.109 3372.85
5062.30 59.790 115.520 3178.32 3233.92 1676.45 8 3086.64 E 5974132.00 N 389011.38 E 0.816 3452.90
5157.56 61.980 112.890 3224.68 3280.28 1710.558 3162.54 E 5974096.75 N 389086.75 E 3.332 3533.31 .
5253.20 62.250 114.880 3269.41 3325.01 1744.778 3239.83 E 5974061.35 N 389163.51 E 1.861 3614.88
5348.68 62.020 114.180 3314.04 3369.64 1779.82 8 3316.62 E 5974025.14 N 389239.76 E 0.691 3696.59
5444.08 61.840 117.150 3358.93 3414.53 1816.278 3392.48 E 5973987.54 N 389315.06 E 2.753 3778.45
5539.62 62.180 115.460 3403.78 3459.38 1853.65 8 3468.11 E 5973949.01 N 389390.10 E 1.602 3860.73
5635.43 61.910 115.080 3448.69 3504.29 1889.788 3544.64 E 5973911.72 N 389466.08 E 0.450 3942.91
5730.79 61.740 116.050 3493.72 3549.32 1926.05 8 3620.47 E 5973874.30 N 389541.35 E 0.914 4024.64
5826.20 61.690 114.590 3538.93 3594.53 1961.998 3696.41 E 5973837.22 N 389616.73 E 1.349 4106.24
5921.52 61.900 117.650 3583.99 3639.59 1998.96 8 3771.82 E 5973799.10 N 389691.57 E 2.838 4188.09
6017.15 61.280 118.130 3629.49 3685.09 2038.31 8 3846.16 E 5973758.62 N 389765.31 E 0.784 4270.61
6112.29 61.250 118.080 3675.23 3730.83 2077.61 8 3919.75 E 5973718.21 N 389838.29 E 0.056 4352.50
6208.23 61.270 114.790 3721.37 3776.97 2115.05 S 3995.06 E 5973679.63 N 389913.02 E 3.007 4434.57
6303.41 60.480 114.370 3767.69 3823.29 2149.648 4070.67 E 5973643.89 N 389988.09 E 0.915 4515.06
6398.50 58.740 112.120 3815.80 3871.40 2182.02 8 4146.02 E 5973610.37 N 390062.94 E 2.741 4593.97
21 May, 2004 - 10:20 Page 3 of7 DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-1 - CD1-0B MWD
Your Ref: API 501032048900
Job No. AKMW3041097, Surveyed: 11 May, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6493.52 58.470 113.430 3865.30 3920.90 2213.41 S 4220.80 E 5973577.84 N 390137.24 E 1.211 4671.81
6588.55 58.560 117.080 3914.94 3970.54 2247.98 S 4294.08 E 5973542.16 N 390209.98 E 3.277 4750.48
6683.86 58.800 117.200 3964.49 4020.09 2285.12 S 4366.53 E 5973503.92 N 390281.86 E 0.274 4830.14
6779.51 58.320 119.880 4014.39 4069.99 2324.10 S 4438.22 E 5973463.86 N 390352.94 E 2.443 4910.36
6875.02 58.630 121.080 4064.33 4119.93 2365.40 S 4508.38 E 5973421.50 N 390422.47 E 1.119 4990.86 .
6970.25 58.600 120.150 4113.92 4169.52 2406.80 S 4578.34 E 5973379.04 N 390491.79 E 0.834 5071.27
7065.86 58.510 115.700 4163.82 4219.42 2444.98 S 4650.38 E 5973339.76 N 390563.25 E 3.972 5151.27
7161.02 58.060 116.490 4213.84 4269.44 2480.59 S 4723.08 E 5973303.05 N 390635.39 E 0.850 5230.14
7256.38 58.400 116.350 4264.05 4319.65 2516.66 S 4795.68 E 5973265.88 N 390707.44 E 0.378 5309.24
7351.54 58.490 117.340 4313.85 4369.45 2553.28 S 4868.03 E 5973228.17 N 390779.23 E 0.892 5388.49
7447.42 58.340 115.480 4364.07 4419.67 2589.61 S 4941.18 E 5973190.73 N 390851.81 E 1.660 5468.17
7542.96 58.620 114.970 4414.02 4469.62 2624.32 S 5014.86 E 5973154.90 N 390924.95 E 0.541 5547.25
7638.30 58.820 113.740 4463.53 4519.13 2657.92 S 5089.09 E 5973120.18 N 390998.66 E 1.122 5626.05
7733.71 58.810 114.510 4512.93 4568.53 2691.28 S 5163.58 E 5973085.69 N 391072.64 E 0.691 5704.91
7829.10 58.530 116.710 4562.53 4618.13 2726.49 S 5237.05 E 5973049.36 N 391145.56 E 1.992 5784.14
7924.48 58.130 115.470 4612.61 4668.21 2762.19 S 5309.95 E 5973012.55 N 391217.91 E 1.183 5863.24
8019.98 58.540 115.030 4662.74 4718.34 2796.86 S 5383.47 E 5972976.77 N 391290.89 E 0.581 5942.16
8115.48 58.190 116.390 4712.84 4768.44 2832.13 S 5456.72 E 5972940.39 N 391363.61 E 1.267 6021.26
8210.89 58.300 118.600 4763.05 4818.65 2869.59 S 5528.68 E 5972901.85 N 391434.99 E 1.973 6100.73
8306.17 58.520 116.550 4812.97 4868.57 2907.15 S 5600.62 E 5972863.19 N 391506.34 E 1.847 6180.26
8401.86 58.510 117.410 4862.95 4918.55 2944.17 S 5673.34 E 5972825.07 N 391578.49 E 0.766 6260.04
8497.16 58.500 119.360 4912.74 4968.34 2982.80 S 5744.82 E 5972785.36 N 391649.38 E 1.745 6339.89 .
8593.20 58.190 117.230 4963.14 5018.74 3021.55 S 5816.80 E 5972745.52 N 391720.76 E 1.915 6420.19
8688.62 57.710 117.230 5013.78 5069.38 3058.56 S 5888.71 E 5972707.42 N 391792.10 E 0.503 6499.34
8784.15 57.610 116.630 5064.88 5120.48 3095.11 S 5960.67 E 5972669.77 N 391863.50 E 0.541 6578.24
8879.43 57.750 116.590 5115.82 5171.42 3131.18 S 6032.66 E 5972632.62 N 391934.93 E 0.151 6656.86
8975.14 57.700 118.520 5166.93 5222.53 3168.61 S 6104.40 E 5972594.10 N 392006.09 E 1.706 6736.15
9070.67 57.920 118.310 5217.83 5273.43 3207.08 S 6175.51 E 5972554.55 N 392076.60 E 0.296 6815.60
9166.19 58.160 118.550 5268.39 5323.99 3245.66 S 6246.77 E 5972514.89 N 392147.27 E 0.330 6895.24
9261.33 58.150 118.040 5318.59 5374.19 3283.97 S 6317.94 E 5972475.50 N 392217.84 E 0.455 6974.63
9356.97 58.050 117.830 5369.13 5424.73 3322.01 S 6389.67 E 5972436.38 N 392288.99 E 0.214 7054.30
9452.42 58.410 114.060 5419.39 5474.99 3357.50 S 6462.62 E 5972399.78 N 392361.40 E 3.379 7133.30
9547.76 58.390 113.510 5469.35 5524.95 3390.25 S 6536.93 E 5972365.91 N 392435.19 E 0.492 7211.63
9643.45 58.010 116.210 5519.78 5575.38 3424.43 S 6610.71 E 5972330.61 N 392508.45 E 2.431 7290.45
9739.00 57.790 116.330 5570.56 5626.16 3460.25 S 6683.29 E 5972293.68 N 392580.48 E 0.254 7369.38
21 May, 2004 - 10:20
Page 4 of7
DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-1 - CD1-OB MWD
Your Ref; API 501032048900
Job No. AKMW3041097, Surveyed: 11 May, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9834.28 58.360 117.550 5620.94 5676.54 3496.89 8 6755.38 E 5972255.95 N 392652.00 E 1.241 7448.43
9929.79 58.480 118.440 5670.96 5726.56 3535.08 8 6827.22 E 5972216.67 N 392723.25 E 0.804 7528.28
1 0025.45 58.580 119.260 5720.90 5776.50 3574.458 6898.69 E 5972176.22 N 392794.11 E 0.739 7608.57
10121.05 58.850 117.710 5770.55 5826.15 3613.418 6970.49 E 5972136.17 N 392865.31 E 1.414 7688.87
10216.52 58.860 118.760 5819.93 5875.53 3652.078 7042.48 E 5972096.42 N 392936.70 E 0.941 7769.12 .
10311.80 58.290 118.910 5869.60 5925.20 3691.28 8 7113.70 E 5972056.13 N 393007.32 E 0.613 7849.13
10407.50 58.300 120.640 5919.90 5975.50 3731.718 7184.37 E 5972014.63 N 393077.36 E 1.538 7929.47
10503.12 58.440 123.280 5970.05 6025.65 3774.808 7253.43 E 5971970.50 N 393145.76 E 2.355 8010.25
10598.70 58.460 114.220 6020.14 6075.74 3813.91 8 7324.73 E 5971930.30 N 393216.46 E 8.076 8090.25
10694.36 58.530 116.680 6070.14 6125.74 3848.96 8 7398.36 E 5971894.14 N 393289.55 E 2.194 8169.50
10789.93 58.220 117.990 6120.25 6175.85 3886.32 8 7470.65 E 5971855.68 N 393361.26 E 1.211 8249.18
10885.22 58.230 117.910 6170.43 6226.03 3924.29 8 7542.21 E 5971816.63 N 393432.24 E 0.072 8328.66
10980.81 58.500 118.160 6220.57 6276.17 3962.55 8 7614.05 E 5971777.29 N 393503.48 E 0.360 8408.54
11073.57 59.520 115.820 6268.33 6323.93 3998.62 8 7684.90 E 5971740.14 N 393573.78 E 2.426 8486.28
11171.87 59.610 117.680 6318.13 6373.73 4036.77 S 7760.58 E 5971700.84 N 393648.87 E 1.634 8569.08
11266.94 59.320 117.220 6366.43 6422.03 4074.528 7833.25 E 5971662.00 N 393720.95 E 0.516 8649.28
11362.76 57.550 115.740 6416.59 6472.19 4110.928 7906.31 E 5971624.48 N 393793.46 E 2.268 8728.95
11458.13 58.31 0 114.070 6467.23 6522.83 4144.958 7979.61 E 5971589.34 N 393866.23 E 1.684 8807.30
11553.46 58.790 116.660 6516.97 6572.57 4179.798 8053.09 E 5971553.39 N 393939.17 E 2.372 8886.30
11648.97 59.030 117.790 6566.30 6621.90 4217.21 8 8125.81 E 5971514.87 N 394011.31 E 1.044 8966.35
11744.42 60.580 118.120 6614.30 6669.90 4255.88 8 8198.68 E 5971475.09 N 394083.59 E 1.651 9047.29
11840.07 63.620 122.780 6659.07 6714.67 4298.748 8271.49 E 5971431.13 N 394155.74 E 5.351 9130.83 .
11935.80 67.000 125.030 6699.06 6754.66 4347.27 S 8343.65 E 5971381.51 N 394227.15 E 4.126 9217.44
12031.08 69.450 130.630 6734.42 6790.02 4401.53 S 8413.48 E 5971326.19 N 394296.14 E 6.033 9305.85
12126.56 73.020 135.050 6765.15 6820.75 4463.008 8479.71 E 5971263.72 N 394361.43 E 5.760 9396.01
12221.73 76.740 137.640 6789.97 6845.57 4529.478 8543.10 E 5971196.29 N 394423.80 E 4.709 9487.12
12317.31 79.830 142.470 6809.39 6864.99 4601.208 8603.15 E 5971123.66 N 394482.75 E 5.910 9578.96
12412.74 82.700 144.440 6823.88 6879.48 4676.97 8 8659.30 E 5971047.04 N 394537.74 E 3.634 9670.31
12454.81 83.820 145.660 6828.82 6884.42 4711.228 8683.23 E 5971012.44 N 394561.15 E 3.922 9710.48
12544.57 85.310 146.710 6837.32 6892.92 4785.45 8 8732.96 E 5970937.45 N 394609.74 E 2.028 9795.88
12640.39 88.270 148.890 6842.68 6898.28 4866.408 8783.93 E 5970855.74 N 394659.47 E 3.834 9886.47
12736.14 89.510 152.060 6844.54 6900.14 4949.69 8 8831.10 E 5970771.75 N 394705.37 E 3.554 9975.59
12831.44 90.190 153.130 6844.79 6900.39 5034.29 S 8874.96 E 5970686.49 N 394747.94 E 1.330 10062.97
12924.29 89.320 153.780 6845.19 6900.79 5117.358 8916.45 E 5970602.80 N 394788.17 E 1.170 10147.54
13022.72 89.750 153.660 6845.98 6901.58 5205.60 8 8960.03 E 5970513.90 N 394830.40 E 0.454 10237.01
21 May, 2004 - 10:20 Page 50f7 DrillQuest 3.03.06.002
Halliburton Sperry-Sun
, Survey Report for Alpine CD-1 - CD1-0B MWD
Your Ref: API 501032048900
Job No. AKMW3041097, Surveyed: 11 May, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-5ea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
13116.42 89.200 154.220 6846.84 6902.44 5289.77 S 9001.19 E 5970429.11 N 394870.28 E 0.838 10322.02
13213.48 88.400 153.700 6848.88 6904.48 5376.96 S 9043.79 E 5970341.29 N 394911.54 E 0.983 10410.05
13309.06 89.320 154.290 6850.78 6906.38 5462.84 S 9085.69 E 5970254.77 N 394952.13 E 1.143 10496.72
13404.44 90.000 154.880 6851.34 6906.94 5548.99 S 9126.62 E 5970168.01 N 394991.75 E 0.944 10582.80
13499.86 90.250 153.940 6851.14 6906.74 5635.05 S 9167.84 E 5970081.34 N 395031.65 E 1.019 10669.05 .
13593.59 90.620 153.880 6850.42 6906.02 5719.23 S 9209.06 E 5969996.54 N 395071.58 E 0.400 10754.11
13691.13 90.370 153.040 6849.58 6905.18 5806.48 S 9252.64 E 5969908.63 N 395113.83 E 0.898 10842.95
13786.58 90.930 152.650 6848.50 6904.10 5891.41 S 9296.20 E 5969823.06 N 395156.09 E 0.715 10930.30
13880.87 91.600 152.590 6846.42 6902.02 5975.11 S 9339.55 E 5969738.70 N 395198.17 E 0.713 11016.72
13977.55 90.000 153.010 6845.07 6900.67 6061.09 S 9383.74 E 5969652.06 N 395241.04 E 1.711 11105.22
14073.09 90.930 153.640 6844.29 6899.89 6146.46 S 9426.63 E 5969566.05 N 395282.63 E 1.176 11192.33
14168.33 89.260 153.880 6844.13 6899.73 6231.88 S 9468.73 E 5969480.00 N 395323.43 E 1.771 11278.87
14264.09 88.700 151.960 6845.84 6901.44 6317.12S 9512.32 E 5969394.10 N 395365.71 E 2.088 11366.44
14359.51 89.380 151.430 6847.44 6903.04 6401.12 S 9557.55 E 5969309.42 N 395409.67 E 0.903 11454.51
14455.22 90.000 151.320 6847.95 6903.55 6485.13 S 9603.41 E 5969224.73 N 395454.23 E 0.658 11543.06
14550.67 90.740 150.770 6847.34 6902.94 6568.65 S 9649.61 E 5969140.52 N 395499.17 E 0.966 11631.58
14645.76 91.360 150.230 6845.60 6901.20 6651.40 S 9696.43 E 5969057.07 N 395544.72 E 0.865 11720.09
14740.13 90.680 150.340 6843.92 6899.52 6733.34 S 9743.20 E 5968974.42 N 395590.24 E 0.730 11808.05
14836.81 91.170 150.820 6842.36 6897.96 6817.54 S 9790.68 E 5968889.50 N 395636.43 E 0.709 11897.99
14932.60 89.750 150.630 6841.59 6897.19 6901.10 S 9837.52 E 5968805.25 N 395681.99 E 1.496 11987.02
15027.89 89.380 151.180 6842.31 6897.91 6984.36 S 9883.86 E 5968721.29 N 395727.06 E 0.696 12075.48
15123.28 90.930 149.810 6842.05 6897.65 7067.37 S 9930.83 E 5968637.57 N 395772.77 E 2.169 12164.28 .
15218.93 91.360 151.080 6840.14 6895.74 7150.56 S 9978.00 E 5968553.68 N 395818.66 E 1.402 12253.34
15314.12 91.420 151.080 6837.83 6893.43 7233.85 S 10024.02 E 5968469.69 N 395863.41 E 0.063 12341.57
15409.33 89.070 151.670 6837.42 6893.02 7317.42 S 10069.63 E 5968385.44 N 395907.74 E 2.545 12429.65
15504.78 91.300 151.390 6837.12 6892.72 7401.32 S 10115.13 E 5968300.86 N 395951.96 E 2.355 12517.86
15600.42 93.210 151.020 6833.35 6888.95 7485.07 S 10161.16 E 5968216.42 N 395996.71 E 2.034 12606.39
15695.95 90.620 151.530 6830.16 6885.76 7568.79 S 10207.04 E 5968132.02 N 396041.31 E 2.763 12694.78
15790.21 88.770 149.670 6830.66 6886.26 7650.90 S 10253.31 E 5968049.21 N 396086.33 E 2.783 12782.46
15837.00 88.770 149.670 6831.67 6887.27 7691.27 S 10276.93 E 5968008.48 N 396109.33 E 0.000 12826.25 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB 55.6' above MSL. Northings and Eastings are relative to 272 FNL, 2751' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from 272 FNL, 2751' FEL and calculated along an Azimuth of 129.080· (True).
21 May, 2004 - 10:20 Page 6of7 DrillQuest 3.03.06.002
.;
Halliburton Sperry-Sun
Survey Report for Alpine CD-1 - CD1-08 MWD
Your Ref: API 501032048900
Job No. AKMW3041097, Surveyed: 11 May, 2004
North Slope, Alaska
Alaska North Slope
Based upon Minimum Curvature type calculations, at a Measured Depth of 15837.00ft.,
The Bottom Hole Displacement is 12836.32ft., in the Direction of 126.8110 (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
.
15837.00
6887.27
7691.27 S
10276.93 E Projected Survey
Survey too/program for CDt-OB MWD
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
615.00
0.00 615.00
611.61 15837.00
611.61 CB-SS-Gyro
6887.27 MWD Magnetic
.
21 May, 2004 - 10:20
Page 7of7
Dril/Quest 3.03.06.002
,
.
,2t:J''¡~n
tZ5~ó
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501-3539
May 24, 2004
RE: MWD Formation Evaluation Logs: CDI-08,
AK-MW-3041 097
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this transmittal letter to the attention of:
Rob Kalish, Sperry-Sun, 6900 Arctic Blvd., Anchorage, AK 99518
1 LDWG formatted Disc with verification listing.
API#: 50-103-20489-00.
~.~
RECEIVED
J Ui\J 0 9 2004
Alaska Oil & Gas Cons. Comml88lOr
Anchorage
\
( .
~.,.
AI,ASKA OIL Alß) GAS
CONSERVATION COMMISSION
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
C. Alvord
Alpine Drilling Team Leader
ConocoPhillips Alaska, Inc.
P.O. Box 100360
Anchorage, Alaska 99510-0360
Re: Colville River CD 1-08
ConocoPhillips Alaska, Inc.
Permit No: 204-059
Surface Location: 272' FNL, 2757' FEL, SEC. 5, TI1N, RSE, UM
Bottomhole Location: 3973' FNL, 2408' FEL, SEC. 10, TI1N, RSE, UM
Dear Mr. Alvord:
Enclosed is the approved application for permit to drill the above referenced development well.
This permit to drill does not exempt you from obtaining additional permits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
S' c r
BY ORDER 9MHE COMMISSION
DA TED thi~ day of April, 2004
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encI.
')
Æ
Lfl
Ii·")
¡ 'RECEiVED
APR - 8 2004
Cons Commission
STATE OF ALASKA
ALASKA OIL & GAS COMMISSION
PERMIT TO DRILL
l Well within Pool:
y- 5975855 Zone- 4 (Height above GL): 56 feet CD1-24, 1214
17. Anticipated Pressure (see 20 AAC 25,035)
Maximum Hole Angle: 900 Max. Downhole Pressure: 3139 psig ... I Max. Surface Pressure: 2445 psig
Setting Depth Quantity of Cement
Specifications Top Bottom c. 1. or sacks
Weight Grade Coupling Length MD TVD MD TVD (including stage data)
62.5# H-40 Weld 77 37 37' 114 114
36# J-55 BTC 3376 37 37' 3413 2363' 644 sx AS Lite & 230 sx LiteCrete
26# L-80 BTC-M 12420 37 37' 12457 6921' 319 sx Class G
9.3# L-80 EUE 11790 32 32' 11822 6749
1a. Type of Work:
Drill 0
Re-entry 0
1 b. Current Well Class:
Stratigraphic Test 0
Redrill U
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
P.O. Box 100360 Anchorage, AK 99510-0360
4a. Location of Well (Gover'W!ental section)~b
Surface: 272' FNL, 2757~ec. 5, T11 N, R5E, UM ,,'
Top of Productive Horizon:
5119' FNL, 4610' FEL, Sec. 3, T11N, R5E, UM
Total Depth: .~
3973' FNL, 2408'.~ec. 10, T11 N, R5E, UM
ft
. ",,/
1..¡t .1...1'1
:/
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 385951 l
16. Deviated wells:
Kickoff depth: 250
18. Casing Program
Size
ft.
Hole
42"
Casing
16"
9.625"
12.25"
8.5"
N/A
7"
3.5"
19
Total Depth MD (ft):
PRESENT WELL CONDITION SUMMARY
Total Depth TVD (ft): Plugs (measured)
Casing
Structural
Conductor
Detailed Operations
Intermediate
Production
Liner
Perforation Depth MD (ft):
Length
A"t~ka Oil & Gas
ExploratoryU Development 011 ~chorage Multiple Zone 0
Service 0 Development Gas 0 Single Zone [2]
5. Bond: l:!J Blanket U Single Well 11. Well Name and Number:
Bond No. 59-52-180 CD1-08
6. Proposed Depth: 12. Field/Pool(s):
MD: 17264' ,I TVD: 6906' I Colville River Field
7. Property Designation: D 2555'1
A'Þí... ~ 372CF¡Ç-
8. Land Use Permit:
ADL N/A
9. Acres in Property:
2560
Alpine River Pool
13. Approximate Spud Date:
4/24/2004
14. Distance to
Nearest Property:
1304' FSL, Sec. 10
10. KB Elevation
15. Distance to Nearest
.I
(To be completed for Redrill and Re-Entry Operations)
Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured)
Size
Cement Volume MD
TVD
Commission Use Only
Permit to Drill. , / ~'1 API Num~e~: "7 _ _ ...i /é;..r.; .'. Permit Approval
Number: ,,20...., -05 1 50- /D·.--? 2.DT15 7·~êC Date:
Conditions of approval: Samples required 0 Yes ~'No Mud log required
,dgen sulfide measures 0 Yes.~o Directional survey required
Oth'05r 3:;"" < ", ,,', '""-~ ~ \:>C) ~ * ~? \". \) \ "''''' ~" '-N .;'''~ ~u
Î\' 1/,--3- II ~<:¿ '< ,\" ",-, Ú \ --.¡ 'u \1è <=y ~ ,,,,-C, BY ORDER OF
Appr ed bi A /11/1 COMMISSIONER THE COMMISSION
FormU:~ 3/2~ Submit in Duplicate 0 R I GI NA L
20. Attachments: Filing Fee [2]
Property Plat 0
BOP Sketch D
Diverter Sketch 0
Drilling Program0
Seabed Report 0
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name
Signature
C. Alvord
, .~,L. r:Þ(
~
Perforation Depth TVD (ft):
Time v. Depth Plot 0
Drilling Fluid Program [2]
Date:
Shallow Hazard Analysis U
20 AAC 25.050 requirements [2]
Contact Vern Johnson @ 265-6081
Title Alpine Drilling Team Leader
Phone US-..... G (z.. 0 Date 4 ( 1 (04- ~ OL'
tJr(:lnRrRQ [IV v. .Johnson
See cover letter
for other requirements
D Yes ~. No
~ Yes 0 No
00~~~·,d ç,,(J~S,\'\\)\
Dam' 1/;/ ~l/
( "/ !
)
)
(
CD1-08 Drilling Hazards Summary
(to be posted in Rig Floor Doghouse Prior to Spud)
(See Well Plan Attachment: Detailed Risk Information for further discussion of these risks)
121/4" H I /95/8" C I t
- oe - aSlna n erva
Event Risk Level Mitigation Strategy
Conductor Broach Low Monitor cellar continuously durina interval.
Well Collision Low Gyro single shots as required
Gas Hydrates Low Monitor well at base of permafrost, increased mud
weight, decreased mud viscosity, increased
circulating times, controlled drilling rates, low mud
temperatures
Running Sands and Gravel Low Maintain planned mud parameters, Increase mud
weight, use weighted sweeps.
Abnormal Pressure in Low Increase mud weight
Surface Formations
>2000' TVD
Lost Circulation Low Reduce pump rates, mud rheology, lost circulation
material, use of low density cement slurries
8 1/2" HI/ 7" C I t
- oe aSlna n erva
Event Risk Level Mitigation Strategy
Abnormal Pressure in low BOPE drills, Keep mud weight above 9.6 ppg.
Surface Formations Check for flow during connections and if needed,
>2000' TVD increase mud weight.
Lost circulation Low Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECD) monitoring, mud
rheology, lost circulation material
Hole swabbing on trips Moderate Reduced trip speeds, mud properties, proper hole
filling, pumping out of hole, real time equivalent
circulating density (ECD) monitoring, weighted
sweeps.
Abnormal Reservoir low Well control drills, increased mud weight. No
Pressure mapped faults occur within 700' of the planned
wellbore.
Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well
control practices, mud scavenaers
6-1/8" Hole / Horizontal Production Hole
Event Risk Level
Lost circulation Low
Hole swabbing on trips
Moderate
Abnormal Reservoir
Pressure
Medium
Hydrogen Sulfide gas
Low
M iti ation Strate
Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECD) monitoring, mud
rheolo ,lost circulation material
Reduced trip speeds, Pump out to 7" shoe, mud
properties, proper hole filling, pumping out of hole,
real time equivalent circulating density (ECD)
monitorin ,wei hted swee s.
BOPE drills, Keep mud weight above 8.8 ppg.
Check for flow during connections and if needed,
increase mud weight. Well control drills, increased
mud wei ht.
H2S drills, detection systems, alarms, standard well
control ractices, mud scaven ers
ORIGINAL
)
'}
t
AIDine : CD1-08 Procedure
1. Move on Doyon 19.
2. Drill 12 %" hole to the surface casing point as per the directional plan.
3. Run and cement 9 5/8" surface casing.
4. Pressure test casing to 2500 psi.
5. Install and test BOPE to minimum 5000 psi.
6. Pick up and run drilling assembly. Drill out 20' of new hole. Perform leak off test to 18 ppg.
7. Drill 8 Y211 hole to the intermediate casing point in the Alpine Sand. (LWD tools, GR/RES/PWD)
8. Run and cement 7" casing as per program. Top of cement +1-500 feet MD above Nanuq (Albian 96) sand if
present. Note: Carry out a leak off test down the 9-5/811 x r casing annulus to confirm the fracture pressure
referenced to the casing shoe. Freeze protect casing annulus.
""
9. Pressure test casing to 3500 psi.
1 O. BOPE Test to 5000 psi.
11. Pick up and run drilling assembly. Drill out and perform FIT to 12.5 ppg EMW. Minimum acceptable leak off
for drilling ahead is 11.5 ppg.
./
12. Drill 6-1/8" horizontal section to well TD. (LWD: GR/RES/PWD)
13. Circulate the hole clean and POOH.
14. Run 3-Y2", 9.3 #, L-80 tubing with SSSV, gas lift mandrels, sliding sleeve, landing nipple and production
packer. Land hanger.
15. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP.
16. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check.
17. Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi I 30 mins.
18. Shear open sliding sleeve. Displace tubing and annulus to diesel keeping pressure on the system.
19. Set BPV and secure well. Move rig off.
ORIGINAL
')
)
Well Proximitv Risks:
Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in following
attachments. CD2-09 will be the closest well to CD1-08. Well separation is 9.9' at 300' MD. Accounting for
survey uncertainties, the ellipse-to-ellipse separation is 4.9' at 300' MD.
Drillina Area Risks:
There are no high-risk events (e.g. over-pressures zones) anticipated. .
Lost circulation: Faulting within the Alpine reservoir section is considered to be the most likely cause of lost
circulation. Standard LCM material has proved effective in dealing with lost circulation in previous development
wells.
Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally as
opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks.
Annular PumDina ODerations:
Incidental fluids developed from drilling operations on well CD1-08 will be injected into a permitted annulus on C02
pad or the class 2 disposal well on CD1 pad.
The CD1-08 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze
protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Alpine reservoir and there will be
500' of cement fill above the top of the Alpine as per regulations.
Upon completion of CD1-08 form 10-403, Application for Sundry Operations, will be filed. Annular pumping of
fluids occurring due to drilling operations, per regulation 20 AAC 25.080, could then begin once properly permitted.
As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping.
There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving
zone. Reference the enclosed directional drilling plan for other formation markers in this well.
Surface casing will be set near the base of the Schrader Bluff Formation (C-40). These 450-500' thick shales are
part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas.
The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the
specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling
fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular
injection, the maximum pressure at the surface casing shoe is estimated by:
Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TV D) + 1,500 psi
= (12.0 ppg) * (0.052) * (2336') + 1,500 psi
= 2,974 psi
Pore Pressure = 1 ,069 psi
Therefore Differential = 2974 - 1069 = 1905 psi.
The internal casing pressure is conservative, since frictional losses while pumping have not been taken into
consideration. The surface and intermediate casing strings exposed to the annular pumping operations have
sufficient strength by using the 85% collapse and burst ratings listed in the following table:
Wt Connection 850/0 of 850/0 of
OD (ppf) Grade Range Type Collapse Collapse Burst Burst
9-5/8" 36 J-55 3 BTC 2,020 psi 1,717 psi 3,520 psi 2.992 Dsi
7" 26 L-80 3 BTC-Mod 5,410 psi 4.599 Dsi 7,240 psi 6,154 psi
ORIGINAL
)
)
CD1-08
DRilLING FLUID PROGRAM
SPUD to Intermediate hole to 7" Production Hole
9-5/8"surface casing casing point - 8 Y2" Section - 6 1 18"
point - 12 %"
Density 8.8 - 9.6 ppg 9.6 - 9.8 ppg 8.1-8.8 ppg
PV 1 0 - 25 10-15
YP 20 - 60 15 - 25 25-30
Funnel Viscosity 100 - 200
Initial Gels 4-8 1 0-15
10 minute gels <18 12-20
API Filtrate NC -10 cc I 30 min 4 - 12 cc/30 min (drilling) NA
HPHT Fluid Loss at 160 12-14 cc/30 min
PH 8.5-9.0 9.0 -10.0 9.0-9.5
KCL 6%
Oil Iwater ratio Approx. 80/20
l--<
Suñace Hole:
A standard high viscosity fresh water I gel spud mud is recommended for the surface interval. Keep flowline
viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud
weight < 9.6 ppg by use of solids control system and dilution where necessary.
Intermediate Hole Section:
Fresh water gel I polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing
fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is penetrated. Maintain mud
weight at or below 9.8 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning
and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability.
Production Hole Section :
The horizontal production interval will be drilled with a 80/20 oil/water ratio M-I Versa-Pro mineral oil based drill-in
fluid. The base fluid will consist of high flashpoint (>200 F) mineral oil with 250/0 by weight calcium chloride as the
internal phase. Calcium carbonate bridging material will be added to minimize formation damage.
ORIGINAL
)
, }
CD1-08
PRESSURE INFORMATION AND CASING DESIGN
(per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2))
The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well:
Casing Size Csg Setting Fracture Pore pressure ASP Drilling
(in) Depth Gradient (Ibs. 1 (psi) (psi)
MDfTVD(ft) caD
16 114/114 10.9 52 53
9 5/8 3413/2363 14.5 1070 1545
7" 12457 1 6921 16.0 3131 2445
NIA 17264 1 6938 16.0 3139 . NIA
· NOTE: The Doyon 195000 psi BOP equipment is adequate. Test BOP's to minimum 3500 psi.
PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP)
ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas
gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as
follows:
1) ASP = [(FG x 0.052) - 0.1]D
Where: ASP = Anticipated Surface pressure in psi
FG = Fracture gradient at the casing seat in Ib/gal
0.052 = Conversion from Ib./gal to psi/ft
0.1 = Gas gradient in psi/ft
D = true Vertical depth of casing seat in ft RKB
OR
2) ASP = FPP - (0.1 x D)
Where; FPP = Formation Pore Pressure at the next casing point
ASP CALCULATIONS
1. Drilling below conductor casing (16")
ASP = [(FG x 0.052) - 0.1] D
= [(10.9 x 0.052) - 0.1] x 114 = 53 psi
OR
ASP = FPP - (0.1 x D)
= 1070 - (0.1 x 2363) = 833.7 psi
2. Drilling below surface casing (9 5/8")
ASP = [(FG x 0.052) - 0.1] D
= [(14.5 x 0.052) - 0.1] x 2363 = 1545 psi
OR
ASP = FPP - (0.1 x D)
= 3131 - (0.1 x 6921') = 2438 psi
3. Drilling below intermediate casing (7")
ASP = FPP - (0.1 x D) .
= 3139 - (0.1 x 6938') = 2445 psi "'
ORIGINAL
CD1-08 Completion Schematic
16" Conduotor to 114'
3-W' x 4-%" cross-over, 2 jts below 4-%Ohanger
3-1/2" Camco TRM-4E SSSV Nipple (2.813" ID) at 1834' TVD=2400' MD
-2.813" X-Over
-Single W'xO.049" sls oontrolline
9-5/8" 36 ppf J-55 BTC
Surfaoe Casing
@ 3413' MD 12363' TVD
oemented to surfaoe
Camco KBUG GLM (2.867" ID)
at 3400' TVD for
E Dummy with 1" BK-2 Latch
PaQker Fluigmix:
Diesel in tubing and annulu~
3-1/2" 9.3 ppf L-80 IBT Mod. R3
tubing run with Jet Lube Run'n'Seal
pipe dope
Completion .MD.
Camco KBUG GLM (2.867" ID)
at 5700' TVD for
E Dummy with 1" BK-2 Latch
Tubing Hanger 32'
4-}2" 12.6 #/ft IBT-Mod Tubing (2)
Crossover
3-1/2", 9.3#/ft, IBT-Mod Tubing
Camoo BAL-O SSSV Nipple
3-1/2", 9.3#/ft, IBT-Mod Tubing
Camco KBUG GLM (2.867" ID)
3-1/2", 9.3#/ft, IBT-Mod Tubing
Cameo KBUG GLM (2.867" ID)
3-1/2", 9.3#/ft, IBT-Mod Tubing
Camoo KBUG GLM (2.867" 10)
3-1/2" tubing joints (2)
Baker 3-1/2" CMPA sliding sleeve
wI 2.81" X Profile
3-1/2" tubing joint (2)
Baker SAB3 Paoker
with millout extension
3-1/2" tubing joints (i)
HES "XN" (2.75" ID)-64$;1 ino
3-1/2" 10' pup joint
WEG
Cameo KBUG GLM (:.(.867" ID)
2 joints above sliding sleeve
E Dummy with 1" BK-2 Latch
2400' 1834'
5399' 3400'
9804' 5700'
1 1550' 6612'
1 1650' 6664'
11750'
11810' 6743'
1 1822' 6749'
Baker 3-W' CMPA sliding sleeve with 2.81 "12!:[f'rofile set:2 joints above SAB3 packer
Pinned for 2865 psi annular shear CW 2.81" X Profile
Baker SAB 3 Packer at +/- 11750' MD
Top Alpine C at 12330' MD 16906' TVD
7" 26 ppf L-80 BTC Mod
Produotion Casing @ 12457' MD 16921' TVD @ 85.5º
WeUTDat ¡
172EWMDl "'1:
6938' TVD
:
.
.
95/8" Surface Casine run to 3413' MD I 2363' TVD.
Cement from 3413' MD to 2913' (500' offill) with Class G + Adds @ 15.8 PPG, and from 2913' to surface
with Arctic Set Lite 3. Assume 300 % excess annular volume in permafrost and 50 % excess below the
permafrost (1768' MD).
Lead slurry:
System:
Tail slurry:
System:
(2913'-1768') X 0.3132 fe/ft X 1.5 (50% excess) = 537.9 ft3 below permafrost
1768' X 0.3132 ft3fft X 4 (300% excess) = 2215.0 ft3 above permafrost
Total volume = 537.9 + 2215.0 = 2752.9 ft3 => 644 Sx @ 4.28 ft3/sk
644 Sx ArcticSet Lite 3 @ 10.7 PPG yielding 4.28 ft3fsk, Class G + 30% D053 thixotropic
additive, 0.6% D046 antifoamer, 1.5% D079 extender, 1.5% SOOI accelerator, 50% D124
extender and 9% BWOW' D044 freeze suppressant
500' X 0.3132 ft3/ft X 1.5 (50% excess) = 234.9 fe annular volume
80' X 0.4341 fe/ft = 34.7 ft3 shoe joint volume
Total volume = 234.9 + 34.7 = 269.6 fe => 230 Sx @ 1.17 ft3/sk
230 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 1 % SOOI accelerator @ 15.8
PPG yielding 1.17 ft3fsk
7" Intermediate Casine run to 12457' MD I 6926' TVD
Cement from 12457' MD to +1- 10493' MD (minimum 500' MD above top of Nanuq/Albian 96 with Class G +
adds @ 15.8 PPG. Assume 40% excess annular volume.
Slurry:
System:
(12457' - 10493') X 0.1268 felft X 1.4 (40% excess) = 348.6 ft3 annular vol.
80' X 0.2148 fefft = 17.2 ft3 shoe joint volume
Total volume = 348.6 + 17.2 = 365.8 ft3 => 221 Sx @ 1.15 ft3/sk
319 Sx Class G + 0.2% D046 antifoamer, 0.25% D065 dispersant, 0.25% D800 retarder and
0.18% D167 fluid loss additive @ 15.8 PPG yielding 1.15 ft3/sk
, By Weight Of mix Water, aU other additives are BIT~l~ I N A L
.
Co
.
¡Iii
ConocoPhillips Alaska Inc.
Colville River Unit
Alpine CD1
Plan: CD1-08
CD1-08
Plan: CD1-08 (wp02)
Standard Planning Report
11 February, 2004
spa'-''-'y-s
A HALLUWRTON C()Mf~ANY
ORIGINAL
~onocoebilliPs AI~
Engineering
Project: Colville River Unit
Site: Alpine CD1
Well: Plan: CD1-OS
Well bore: CD1-OS
Plan: CD1-OS (wp02)
eonocÓÁ,illips
2000
1000
(} -..
-1000
-2000
-3000
"2
~
o
o
o
~ -4000
+'
:c
t
o
Z -5000
2
.s:::.
"5
o
(/) -6000
-7000
-8000
-9000
-10000
-11000
See MD
1 36.500
2 250.001
3 1500.001
4 1767.883
5 11667.728
6 12577.107
7 15764.075
8 17264.075
- ---
Calculation Method: Minimum Curvature
Error System: ISCWSA
Scan Method: Trav. Cylinder North
Error Surface: Elliptical Conic
Warning Method: Rules Based
J ~. · SL= 272'FNL & 2757'FEL; Sec5-T11 N-R5E
Þ\- .' I. .' I
~ II
~.....9 5/8" Csg Pt @ 3413' MD
*
C-30 _ ~
C-20
/
p.....,
C-40
K-3 Marker
......1..... BasallK-3 SS
/ ...I<··-'K_2 Marker
I~'·" ..' Base K-2 Sequencp
"'Ç Albian 97
~
---- -
Albian 96
I
/' Top ~RZ
.... ~ .../ /../......../ K-1 Marker
N:. }. //./
.......¡-..,;,:::...............
:"\..
'"''''
::-.:c:.'..
~,
I~
Top Kuparuk
I
. Kuparuk C
¡
.."·LCU
I
. 7" Csg Pt @ 12457' MD
I
I
CD1-08 (Heel)
Miluveach A ..
I
Alpine D
.~ -- ---- ---- I~· .~~
I
Target Heel= 5119'FNL & 4610'FEL; Sec3- T11N-R5E
1- -
.."--
_ __ _ __ _ _ _ ~ ~Tm~èT~,.. "~FNC& 3èJ"''''':'''è~ :èJ~-~! _ ; __ ~ CDJ'" ~,,)
I :~
TD=3973'~&2408'FEL; Sec10-T11N-R5E I ~
l.1·/.:I\
. . ,~.pi: 6 ~ /8" Open Hole
J,¡c. )\;"- :
g\' I
~.Cì I
fl'i. I I
I I,
- ---- .~...~-
I
-1000
Ine
0.000
0.000
50.000
58.516
58.516
89.856
89.856
89.856
,
I
I
I
,
o
1000
12000
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
West(-)/East(+) (2000 Win)
SECTION DETAILS
AzI
0.000
0.000
125.000
116.967
116.967
151.799
151.799
151.799
SpSr"r"v-sun
ÞRIL.L.ING SERVICES
TVO +NI-5 +EI-W
36.500 0.000 0.000
250.001 0.000 0.000
1347.278 -293.481 419.135
1503.782 -404.454 605.532
6674.043 -4232.872 8130.062
6926.014 -4841.715 8721.915
6934.014 -7650.375 10227.947
6937.779 -8972.318 10936.786
DLeg
0.00
0.00
4.00
4.00
0.00
5.00
.0.00
0.00
TFace
0.00
0.00
125.00
-39.87
0.00 8970.265
53.25 9814.003
0.00 12759.759
0.00 14146.229
CD1-OS (Heel)
CD1-OS (Toe)
A llu.Um}l~roN (::t),\IPA,X"
AL
ConocoPhillips Alaska Inc.
Engineering
Project: Colville River Unit
Site: Alpine CD1
Well: Plan: CD1-08
Well bore: CD1-08
Plan: CD1-08 (wp02)
eonocJPhillips
Calculation Method: Minimum Curvature
Error System: ISCWSA
Scan Method: Trav. Cylinder North
Error Surface: Elliptical Conic
Warning Method: Rules Based
Approved Plan
36 0
0
1000 1347
C-4O
2000
.C-30
Begin Dir @ 4.00: 250.002'MD, 250.002' TVD
I I I
Continue Dir @ 4.00: 1500.002'MD, 1347.279' TVD
. ,
-2000
Miluveach A
. I .
-1000
o
1000
2000
3000
4000
Target Heel= 5119'FNL & 4610'FEL; Sec3-T11N-R5E
I t I ' I I I I I I I I I I , , I '
5000 6000 7000 8000 9000
11000
13000
14000
15000
16000
Alpine C
Target Toe= 2650'FNL & 3113'FEL; Sec10-T11N-R5E
SECTION DETAILS
See MD Ine
1 36.500 0.000
2 250.001 0.000
3 1500.001 50.000
4 1767.883 58.516
5 11667.728 58.516
6 12577.107 89.856
7 15764.075 89.856
8 17264.075 89.856
Azi TVD ..w-5 +EI-W
0.000 36.500 0.000 0.000
0.000 250.001 0.000 0.000
125.000 1347.278 -293.481 419.135
116.967 1503.782 -404.454 605.532
116.967 6674.043 -4232.812 8130.062
151.799 6926.014 -4841.715 8121.915
151.799 6934.014 -7650.375 10227.947
151.799 6937.779 -8972.31810936.786
DLeg
0.00
0.00
4.00
4.00
0.00
5.00
0.00
0.00
TFace VSec
0.00 0.000
0.00 0.000
125.00 510.185
-39.87 724.678
0.00 8970.265
53.25 9814.003
0.00 12759.759
0.00 14146229
CD1-OS (Heel)
CD1-OS (Toe)
spEll""'l""'y-sun
DRU,.L,,!NG ~§RVIC:;~S
A HAUtiinri'O:~(,O:....u·,\:.\¡V
-
SPERRY_SUN HES
Planning Report
.
UIiIPS
spel""'l""'y-sun
DRILLING SEiRVIC:EiS
A HALUBVRTON COMPANY
Site Position:
From: Map
I Position Uncertainty:
I
0.000 ft
I Audit Notes:
I Version:
4
Phase:
PLAN
Tie On Depth:
36.500
36.500 0.000 0.000 36.500 0.000 0.000 0.00 0.00 0.00
250.001 0.000 0.000 250.001 0.000 0.000 0.00 0.00 0.00
1500.001 50.000 125.000 1347.278 -293.481 419.135 4.00 0.00 125.00
1767.883 58.516 116.967 1503.782 -404.454 605.532 4.00 -3.00 -39.87
11667.728 58.516 116.967 6674.043 -4232.872 8130.062 0.00 0.00 0.00
12577.107 89.856 151.799 6926.014 -4841.715 8721.915 5.00 3.83 53.25 CD1-08 (Heel)
15764.075 89.856 151.799 6934.014 -7650.375 10227.947 0.00 0.00 0.00 CD1-08 (Toe)
17264.075 89.856 151.799 6937.779 -8972.318 10936.786 0.00 0.00 0.00
2/11/200410:12:43AM
Page 2 of 7
COMPASS 2003.5
ORIGINAL
eonocÓPhillips
-
SPERRY_SUN HES
Planning Report
.
spei'i'y-sun
DRILLING seRVIc:es
A HALLIBURTON COMPANY
36.500 0.000 0.000 36.500 0.000 0.000 0.000 0.00 0.00 0.00
§.!..::::..·~!'~0fN!..~~7$7·FEL;.Seê5ÄT11NÄR5E
100.000 0.000 0.000 100.000 0.000 0.000 0.00
200.000 0.000 0.000 200.000 0.000 0.000 0.000 0.00 0.00 0.00
250.001 0.000 0.000 250.001 0.000 0.000 0.000 0.00 0.00 0.00
300.000 2.000 125.000 299.990 -0.500 0.715 0.870 4.00 4.00 0.00
400.000 6.000 125.000 399.726 -4.501 6.428 7.824 4.00 4.00 0.00
500.000 10.000 125.000 498.733 -12.482 17.826 21.698 4.00 4.00 0.00
600.000 14.000 125.000 596.528 -24.405 34.853 42.425 4.00 4.00 0.00
700.000 18.000 125.000 692.634 -40.211 57.428 69.903 4.00 4.00 0.00
800.000 22.000 125.000 786.584 -59.825 85.439 103.999 4.00 4.00 0.00
900.000 26.000 125.000 877.920 -83.149 118.750 144.546 4.00 4.00 0.00
1000.000 30.000 125.000 966.197 -110.072 157.199 191.348 4.00 4.00 0.00
1100.000 34.000 125.000 1050.985 -140.460 200.598 244.175 4.00 4.00 0.00
1200.000 38.000 125.000 1131.870 -174.168 248.737 302.771 4.00 4.00 0.00
1300.000 42.000 125.000 1208.459 -211.029 301.380 366.851 4.00 4.00 0.00
1400.000 46.000 125.000 1280.379 -250.865 358.272 436.101 4.00 4.00 0.00
1500.001 50.000 125.000 1347.278 -293.481 419.135 510.185 4.00 4.00 0.00
1600.000 53.115 121.795 1409.453 -336.539 484.527 588.051 4.00 3.12 -3.20
1700.000 56.310 118.845 1467.222 -377.698 554.987 668.631 4.00 3.19 -2.95
1767.883 58.516 116.967 1503.782 -404.454 605.532 724.678 4.00 3.25 -2.77
1800.000 58.516 116.967 1520.556 -416.874 629.943 751.428 0.00 0.00 0.00
1900.000 58.516 116.967 1572.781 -455.545 705.949 834.718 0.00 0.00 0.00
2000.000 58.516 116.967 1625.007 -494.217 781.956 918.008 0.00 0.00 0.00
2100.000 58.516 116.967 1677.233 -532.888 857.962 1001.298 0.00 0.00 0.00
2200.000 58.516 116.967 1729.458 -571.560 933.969 1084.588 0.00 0.00 0.00
2300.000 58.516 116.967 1781.684 -610.231 1009.975 1167.878 0.00 0.00 0.00
2400.000 58.516 116.967 1833.910 -648.903 1085.982 1251.168 0.00 0.00 0.00
2500.000 58.516 116.967 1886.135 -687.574 1161.988 1334.458 0.00 0.00 0.00
2600.000 58.516 116.967 1938.361 -726.246 1237.995 1417.748 0.00 0.00 0.00
2700.000 58.516 116.967 1990.587 -764.917 1314.001 1501.039 0.00 0.00 0.00
2800.000 58.516 116.967 2042.812 -803.589 1390.008 1584.329 0.00 0.00 0.00
2900.000 58.516 116.967 2095.038 -842.260 1466.014 1667.619 0.00 0.00 0.00
3000.000 58.516 116.967 2147.264 -880.932 1542.021 1750.909 0.00 0.00 0.00
3064.597 58.516 116.967 2181.000 -905.913 1591.119 1804.712 0.00 0.00 0.00
58.516 116.967 -919.603 0.00
3200.000 58.516 116.967 2251.715 -958.275 1694.034 1917.489 0.00 0.00 0.00
3300.000 58.516 116.967 2303.941 -996.946 1770.041 2000.779 0.00 0.00 0.00
3400.000 58.516 116.967 2356.166 -1035.618 1846.047 2084.069 0.00 0.00 0.00
3413.085 58.516 116.967 2363.000 -1040.678 1855.992 2094.967 0.00 0.00 0.00
~... 518"q~gp~@ 3413~l\ItD
3432.233 58.516 116.967 21 0.00 0.00
C-30
3500.000 58.516 116.967 2408.392 -1074.289 1922.054 2167.359 0.00 0.00 0.00
3600.000 58.516 116.967 2460.618 -1112.961 1998.060 2250.649 0.00 0.00 0.00
3700.000 58.516 116.967 2512.843 -1151.632 2074.067 2333.939 0.00 0.00 0.00
3800.000 58.516 116.967 2565.069 -1190.304 2150.073 2417.229 0.00 0.00 0.00
3900.000 58.516 116.967 2617.295 -1228.975 2226.080 2500.519 0.00 0.00 0.00
4000.000 58.516 116.967 2669.520 -1267.647 2302.086 2583.809 0.00 0.00 0.00
4100.000 58.516 116.967 2721.746 -1306.318 2378.093 2667.099 0.00 0.00 0.00
4165.588 58.516 116.967 2756.000 -1331.682 2427.944 2721.728 0.00 0.00 0.00
2/11/200410:12:43AM Page 3 of 7 COMPASS 2003.5
ORIGINAL
Co~illips
.
SPERRY_SUN HES
Planning Report
.
spef'"'lf'"'ly-sun
CRIL.L.ING seRVices
A HALLIBURTON COMPANY
C"20
4200.000 58.516 116.967 -1344.990 2750.389 0.00
4300.000 58.516 116.967 2826.197 -1383.661 2530.106 2833.680 0.00 0.00 0.00
4400.000 58.516 116.967 2878.423 -1422.333 2606.113 2916.970 0.00 0.00 0.00
4500.000 58.516 116.967 2930.649 -1461.004 2682.119 3000.260 0.00 0.00 0.00
4600.000 58.516 116.967 2982.875 -1499.676 2758.126 3083.550 0.00 0.00 0.00
4700.000 58.516 116.967 3035.100 -1538.347 2834.132 3166.840 0.00 0.00 0.00
4800.000 58.516 116.967 3087.326 -1577.019 2910.139 3250.130 0.00 0.00 0.00
4900.000 58.516 116.967 3139.552 -1615.690 2986.145 3333.420 0.00 0.00 0.00
5000.000 58.516 116.967 3191.777 -1654.362 3062.152 3416.710 0.00 0.00 0.00
5100.000 58.516 116.967 3244.003 -1693.033 3138.158 3500.000 0.00 0.00 0.00
5200.000 58.516 116.967 3296.229 -1731.705 3214.165 3583.290 0.00 0.00 0.00
5300.000 58.516 116.967 3348.454 -1770.376 3290.172 3666.580 0.00 0.00 0.00
5400.000 58.516 116.967 3400.680 -1809.048 3366.178 3749.870 0.00 0.00 0.00
5500.000 58.516 116.967 3452.906 -1847.719 3442.185 3833.160 0.00 0.00 0.00
5600.000 58.516 116.967 3505.131 -1886.391 3518.191 3916.450 0.00 0.00 0.00
5700.000 58.516 116.967 3557.357 -1925.062 3594.198 3999.740 0.00 0.00 0.00
5800.000 58.516 116.967 3609.583 -1963.734 3670.204 4083.030 0.00 0.00 0.00
5900.000 58.516 116.967 3661.808 -2002.405 3746.211 4166.320 0.00 0.00 0.00
6000.000 58.516 116.967 3714.034 -2041.077 3822.217 4249.611 0.00 0.00 0.00
6100.000 58.516 116.967 3766.260 -2079.748 3898.224 4332.901 0.00 0.00 0.00
6132.054 58.516 116.967 3783.000 -2092.144 3922.587 4359.598 0.00 0.00 0.00
K'-3Market
6200.000 -2118.420 3974.230 0.00
6300.000 58.516 116.967 3870.711 -2157.091 4050.237 4499.481 0.00 0.00 0.00
6400.000 58.516 116.967 3922.937 -2195.763 4126.243 4582.771 0.00 0.00 0.00
6497.775 58.516 116.967 3974.000 -2233.573 4200.559 4664.207 0.00 0.00 0.00
1 3975.162 -2234.434
6583.939 58.516 116.967 4019.000 -2266.895 4266.049 4735.974 0.00 0.00 0.00
6600.000 58.516 116.967 4027.388 -2273.106 4278.257 4749.351 0.00 0.00 0.00
6700.000 58.516 116.967 4079.614 -2311.777 4354.263 4832.641 0.00 0.00 0.00
6800.000 58.516 116.967 4131.839 -2350.449 4430.270 4915.931 0.00 0.00 0.00
6807.967 58.516 116.967 4136.000 -2353.529 4436.325 4922.567 0.00 0.00 0.00
Base.·K,~~s¡~ql.leijçe
6900.000 58.516 116.967 4184.065 -2389.120 4999.221 0.00
7000.000 58.516 116.967 4236.291 -2427.791 4582.283 5082.511 0.00 0.00 0.00
7100.000 58.516 116.967 4288.516 -2466.463 4658.289 5165.801 0.00 0.00 0.00
7200.000 58.516 116.967 4340.742 -2505.134 4734.296 5249.091 0.00 0.00 0.00
7300.000 58.516 116.967 4392.968 -2543.806 4810.302 5332.381 0.00 0.00 0.00
7400.000 58.516 116.967 4445.193 -2582.477 4886.309 5415.671 0.00 0.00 0.00
7500.000 58.516 116.967 4497.419 -2621.149 4962.315 5498.961 0.00 0.00 0.00
7600.000 58.516 116.967 4549.645 -2659.820 5038.322 5582.251 0.00 0.00 0.00
7700.000 58.516 116.967 4601.870 -2698.492 5114.329 5665.542 0.00 0.00 0.00
7800.000 58.516 116.967 4654.096 -2737.163 5190.335 5748.832 0.00 0.00 0.00
7900.000 58.516 116.967 4706.322 -2775.835 5266.342 5832.122 0.00 0.00 0.00
8000.000 58.516 116.967 4758.547 -2814.506 5342.348 5915.412 0.00 0.00 0.00
8100.000 58.516 116.967 4810.773 -2853.178 5418.355 5998.702 0.00 0.00 0.00
8200.000 58.516 116.967 4862.999 -2891.849 5494.361 6081.992 0.00 0.00 0.00
8300.000 58.516 116.967 4915.225 -2930.521 5570.368 6165.282 0.00 0.00 0.00
8400.000 58.516 116.967 4967.450 -2969.192 5646.374 6248.572 0.00 0.00 0.00
8500.000 58.516 116.967 5019.676 -3007.864 5722.381 6331.862 0.00 0.00 0.00
8600.000 58.516 116.967 5071.902 -3046.535 5798.387 6415.152 0.00 0.00 0.00
8700.000 58.516 116.967 5124.127 -3085.207 5874.394 6498.442 0.00 0.00 0.00
8800.000 58.516 116.967 5176.353 -3123.878 5950.401 6581.732 0.00 0.00 0.00
8900.000 58.516 116.967 5228.579 -3162.550 6026.407 6665.022 0.00 0.00 0.00
9000.000 58.516 116.967 5280.804 -3201.221 6102.414 6748.312 0.00 0.00 0.00
2/11/200410:12:43AM Page 4 of 7 COMPASS 2003.5
ORIGINAL
eonocJÂ,¡lIips
-
SPERRY_SUN HES
Planning Report
e
spE!!l""'l""'y-sun
DRII...I...ING seRVIc:es
A HALLIBURTON COMPANY
6831.602 0.00 0.00
6914.892 0.00 0.00
6998.183 0.00 0.00
7081.473 0.00 0.00
9500.000 58.516 116.967 5541.933 -3394.579 6482.446 7164.763 0.00 0.00 0.00
9600.000 58.516 116.967 5594.158 -3433.250 6558.453 7248.053 0.00 0.00 0.00
9700.000 58.516 116.967 5646.384 -3471.922 6634.459 7331.343 0.00 0.00 0.00
9800.000 58.516 116.967 5698.610 -3510.593 6710.466 7414.633 0.00 0.00 0.00
9900.000 58.516 116.967 5750.835 -3549.265 6786.472 7497.923 0.00 0.00 0.00
10000.000 58.516 116.967 5803.061 -3587.936 6862.479 7581.213 0.00 0.00 0.00
10100.000 58.516 116.967 5855.287 -3626.608 6938.486 7664.503 0.00 0.00 0.00
10193.275 58.516 116.967 5904.000 -3662.678 7009.381 7742.192 0.00 0.00 0.00
Albian 97
10200.000 58.516 116.967 5907.512 -3665.279 0.00
10300.000 58.516 116.967 5959.738 -3703.951 7090.499 7831.083 0.00 0.00 0.00
10400.000 58.516 116.967 6011.964 -3742.622 7166.505 7914.373 0.00 0.00 0.00
10500.000 58.516 116.967 6064.189 -3781.294 7242.512 7997.663 0.00 0.00 0.00
10600.000 58.516 116.967 6116.415 -3819.965 7318.518 8080.953 0.00 0.00 0.00
10693.029 58.516 116.967 6165.000 -3855.941 7389.226 8158.437 0.00 0.00 0.00
Albian 96
10700.000 58.516 116.967 6168.641 -3858.637
10800.000 58.516 116.967 6220.866 -3897.308 7470.531 8247.533 0.00 0.00 0.00
10900.000 58.516 116.967 6273.092 -3935.980 7546.538 8330.823 0.00 0.00 0.00
11000.000 58.516 116.967 6325.318 -3974.651 7622.544 8414.114 0.00 0.00 0.00
11100.000 58.516 116.967 6377.543 -4013.323 7698.551 8497.404 0.00 0.00 0.00
11200.000 58.516 116.967 6429.769 -4051.994 7774.558 8580.694 0.00 0.00 0.00
11227.249 58.516 116.967 6444.000 -4062.532 7795.269 8603.389 0.00 0.00 0.00
TopiHRZ
11300.000 58.516 116.967 6481.995 -4090.666 7850.564 0.00
11400.000 58.516 116.967 6534.220 -4129.337 7926.571 8747.274 0.00 0.00 0.00
11500.000 58.516 116.967 6586.446 -4168.009 8002.577 8830.564 0.00 0.00 0.00
11552.759 58.516 116.967 6614.000 -4188.411 8042.678 8874.507 0.00 0.00 0.00
11600.000 58.516 116.967 6638.672 -4206.680 8078.584 8913.854 0.00 0.00 0.00
11654.242 58.516 116.967 6667.000 -4227.656 8119.811 8959.032 0.00 0.00 0.00
K-1
11667.728 1 8970.265 0.00 0.00
11700.000 59.490 118.467 6690.663 -4245.739 8154.548 8997.357 5.00 3.02 4.65
11742.866 60.810 120.414 6712.000 -4264.015 8186.922 9033.978 5.00 3.08 4.54
11800.000 62.612 122.932 6739.079 -4290.436 8229.727 9083.829 5.00 3.15 4.41
11837.549 63.820 124.542 6756.000 -4309.053 8257.599 9117.186 5.00 3.22 4.29
K4pørÜkC
11846.663 64.116 124.928 6760.000 -4313.720
LCU
11900.000 127.147 5.00 3.28 4.16
12000.000 69.233 131.149 6820.744 -4400.513 8375.028 9265.981 5.00 3.37 4.00
12100.000 72.687 134.974 6853.372 -4465.055 8444.045 9360.276 5.00 3.45 3.83
12144.369 74.243 136.624 6866.000 -4495.547 8473.695 9402.539 5.00 3.51 3.72
12200.000 1 138.657 8509.932
12229.708 77.269 139.728 6887.000 -4557.181 8528.829 9484.256 5.00 3.56 3.61
79.788 142.229 5.00
12329.873 80.865 143.279 6906.000 -4634.137 8590.011 9580.367 5.00 3.60 3.52
AlpineC
12400.000 83.403 145.721 6915.598 -4690.685 8630.341 9647.413 5.00 3.62 3.48
12457.000 85.476 147.687 6921.121 -4738.100 8661.480 9701.561 5.00 3.64 3.45
2/11/200410:12:43AM Page 5 of 7 COMPASS 2003.5
ORIGINAL
Co~illips
-
SPERRY_SUN HES
Planning Report
e
SpB""'ï'y-sun
DRILLING seRVIc:es
A HALLIBURTON COMPANY
7"Csg Pt@1~4~7'jMº
12500.000 87.042 8683.946
12577.107 89.856 151.799 6926.014 -4841.715 8721.915 9814.003 5.00 3.65 3.42
12600.000 89.856 151.799 6926.071 -4861.891 8732.733 9835.163 0.00 0.00 0.00
12700.000 89.856 151.799 6926.322 -4950.020 8779.989 9927.595 0.00 0.00 0.00
12800.000 89.856 151.799 6926.573 -5038.150 8827.245 10020.026 0.00 0.00 0.00
12900.000 89.856 151.799 6926.824 -5126.279 8874.501 10112.457 0.00 0.00 0.00
13000.000 89.856 151.799 6927.075 -5214.409 8921.757 10204.889 0.00 0.00 0.00
13100.000 89.856 151.799 6927.326 -5302.539 8969.013 10297.320 0.00 0.00 0.00
13200.000 89.856 151.799 6927.577 -5390.668 9016.269 10389.751 0.00 0.00 0.00
13300.000 89.856 151.799 6927.828 -5478.798 9063.525 10482.182 0.00 0.00 0.00
13400.000 89.856 151.799 6928.080 -5566.927 9110.781 10574.614 0.00 0.00 0.00
13500.000 89.856 151.799 6928.331 -5655.057 9158.037 10667.045 0.00 0.00 0.00
13600.000 89.856 151.799 6928.582 -5743.186 9205.293 10759.476 0.00 0.00 0.00
13700.000 89.856 151.799 6928.833 -5831.316 9252.549 10851.908 0.00 0.00 0.00
13800.000 89.856 151.799 6929.084 -5919.445 9299.805 10944.339 0.00 0.00 0.00
13900.000 89.856 151.799 6929.335 -6007.575 9347.061 11036.770 0.00 0.00 0.00
14000.000 89.856 151.799 6929.586 -6095.704 9394.317 11129.202 0.00 0.00 0.00
14100.000 89.856 151.799 6929.837 -6183.834 9441.573 11221.633 0.00 0.00 0.00
14200.000 89.856 151.799 6930.088 -6271.963 9488.829 11314.064 0.00 0.00 0.00
14300.000 89.856 151.799 6930.339 -6360.093 9536.085 11406.495 0.00 0.00 0.00
14400.000 89.856 151.799 6930.590 -6448.222 9583.340 11498.927 0.00 0.00 0.00
14500.000 89.856 151.799 6930.841 -6536.352 9630.596 11591.358 0.00 0.00 0.00
14600.000 89.856 151.799 6931.092 -6624.481 9677.852 11683.789 0.00 0.00 0.00
14700.000 89.856 151.799 6931.343 -6712.611 9725.108 11776.221 0.00 0.00 0.00
14800.000 89.856 151.799 6931.594 -6800.740 9772.364 11868.652 0.00 0.00 0.00
14900.000 89.856 151.799 6931.845 -6888.870 9819.620 11961.083 0.00 0.00 0.00
15000.000 89.856 151.799 6932.096 -6976.999 9866.876 12053.515 0.00 0.00 0.00
15100.000 89.856 151.799 6932.347 -7065.129 9914.132 12145.946 0.00 0.00 0.00
15200.000 89.856 151.799 6932.598 -7153.258 9961.388 12238.377 0.00 0.00 0.00
15300.000 89.856 151.799 6932.849 -7241.388 10008.644 12330.809 0.00 0.00 0.00
15400.000 89.856 151.799 6933.100 -7329.517 10055.900 12423.240 0.00 0.00 0.00
15500.000 89.856 151.799 6933.351 -7417.647 10103.156 12515.671 0.00 0.00 0.00
15600.000 89.856 151.799 6933.602 -7505.776 10150.412 12608.102 0.00 0.00 0.00
15700.000 89.856 151.799 6933.853 -7593.906 10197.668 12700.534 0.00 0.00 0.00
15764.075 89.856 151.799 6934.014 -7650.375 10227.947 12759.759 0.00 0.00 0.00
Target Toe;;:2~~Q;!?NL&~11~~!?:¡4;$~Ç1Q.T11 N.~5E-CD1-08 (Toe)
15800.000 89.856 151.799 6934.104 -7682.036 10244.924 12792.965
15900.000 89.856 151.799 6934.355 -7770.165 10292.180 12885.396 0.00 0.00 0.00
16000.000 89.856 151.799 6934.606 -7858.295 10339.436 12977.828 0.00 0.00 0.00
16100.000 89.856 151.799 6934.857 -7946.424 10386.692 13070.259 0.00 0.00 0.00
16200.000 89.856 151.799 6935.108 -8034.554 10433.948 13162.690 0.00 0.00 0.00
16300.000 89.856 151.799 6935.359 -8122.683 10481.204 13255.122 0.00 0.00 0.00
16400.000 89.856 151.799 6935.610 -8210.813 10528.460 13347.553 0.00 0.00 0.00
16500.000 89.856 151.799 6935.861 -8298.942 10575.715 13439.984 0.00 0.00 0.00
16600.000 89.856 151.799 6936.112 -8387.072 10622.971 13532.415 0.00 0.00 0.00
16700.000 89.856 151.799 6936.363 -8475.201 10670.227 13624.847 0.00 0.00 0.00
16800.000 89.856 151.799 6936.614 -8563.331 10717.483 13717.278 0.00 0.00 0.00
16900.000 89.856 151.799 6936.865 -8651.460 10764.739 13809.709 0.00 0.00 0.00
17000.000 89.856 151.799 6937.116 -8739.590 10811.995 13902.141 0.00 0.00 0.00
17100.000 89.856 151.799 6937.367 -8827.719 10859.251 13994.572 0.00 0.00 0.00
17200.000 89.856 151.799 6937.618 -8915.849 10906.507 14087.003 0.00 0.00 0.00
17264.075 89.856 151.799 6937.779 -8972.318 10936.786 14146.229 0.00 0.00 0.00
]ºF~~7'~'!?NJ.,&~408·FEI..i;$i!Jç1ØPT11NHR5E ·611S" Open Hole /
2/11/2004 10: 12:43AM
Page 6 of 7
COMPASS 2003.5
ORIGINAL
eonocÓPhillips
-
SPERRY_SUN HES
Planning Report
e,
spera""y-sun
DRILLING seRVIc:es
A HALLIBURTON COMPANY
3064.597 2181.000 C-40 0.00
3432.233 2373.000 C-30 0.00
4165.588 2756.000 C-20 0.00
6132.054 3783.000 K-3 Marker 0.00
6497.775 3974.000 Basal K-3 SS 0.00
6583.939 4019.000 K-2 Marker 0.00
6807.967 4136.000 Base K-2 Sequence 0.00
10193.275 5904.000 Albian 97 0.00
10693.029 6165.000 Albian 96 0.00
11227.249 6444.000 Top HRZ 0.00
11552.759 6614.000 Base HRZ 0.00
11654.242 6667.000 K-1 Marker 0.00
11742.866 6712.000 Top Kuparuk 0.00
11837.549 6756.000 Kuparuk C 0.00
11846.663 6760.000 LCU 0.00
12144.369 6866.000 Miluveach A 0.00
12229.708 6887.000 Alpine D 0.00
12329.873 6906.000 Alpine C 0.00
SL= 272'FNL & 2757'FEL; Sec5- T11 N-R5E '"
Target Heel= 5119'FNL & 4610'FEL; Sec3-T11 N-R5E
Target Toe= 2650'FNL & 3113'FEL; Sec1 0- T11 N-R5E
TD=3973'FNL & 2408'FEL; Sec1 0- T11 N-R5E /
J
2/11/200410:12:43AM
Page 7 of 7
COMPASS 2003.5
ORIGINAL
wr;.lL DETAILS
N~
+N/-S
+EI-W
Northing Easting
Lalìude Lo~
70"20'34.428N 15O"5:'i'32,291W
CDl_8
Intorpolation Method:MD
Depth Range From; 36.50
Maximum Range: 1922.75
5975855.4]4385950.509
Tool
CB-GYRO-SS
MWD+IFR-AK-CAZ-SC
CD1-04 (CD1-04)
-02 (CD1-02)
CD1-o1
(CD1-o1)
5V?>\~
100 lÖ)\.() CD1-03 (CD1-03)
6 cP\-\)5
¡:;'II
G"V ¡:P'
j:)'I~ G"">;
72 G"">; ¡:P~
§-.<9">;
-ç,'$' v
o
48
72
6
100
SECTION DEI AILS
See MD Inc Azj TVD +N/-S +EJ-W DLeg TFace VSee Target
36.50 0.000 0.000 36.50 0.00 0.00 0.00 0.000 0.00
250.00 0.000 0.000 250.00 0.00 0.00 0.00 0.000 0.00
1500.00 50.000 125.000 1347.28 -293.48 419.13 4.00 125.000 510.18
1767.88 58.516 116.967 1503.78 -404.45 605.53 4.00 -39.864 724.67
11667.71 58.516 116.967 6674.03 -4232.92 8130.02 0.00 0.000 8970.25
12577.OS 89.856 151.800 6926.00 -4841.76 8721.87 5.00 53.249 9813.98 CDl-OS (Heel)
15764.04 89.856 151.800 6934.00 -7650.43 10227.88 0.00 0.000 12759.73 CDl-OS (Toe)
17264.04 89.856 151.800 6937.77 -8972.37 H!J36.71 0.00 0.000 14146.20
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [ft]
ANTI-COLLISION SETIlNGS
CO ANY DETAILS
ConocoPhillips Abska Inc.
Engineering
....me
CDl-OS
Interval: 50.DO
To: 17264.04
Reforence: Plan: CD1-08 (wp02)
V.Sectim
Angle
129.365a
Colour To MD
300
400
500
750
1000
1250
1500
1750
2000
2500
3000
3500
4000
4500
5000
5500
6500
7500
8500
9500
10000
10500
11000
12000
13000
90
Rig,
Ref. Datum;
Doyon 19
CDl (PLuming RKB) @ 56'
Origin Origin Starting
+Nf-S +FJ-W FromTVD
56.0Qfi
Cak:1ÙItion Method; Minirnun Cwvatuœ
&ror System: ISCWSA
Scan Method; Trav Cyinder North
&ror Swface; EIlipûcaI + Casing
Warning Method; RWes Based
0.00
0.00
36.50
Scanned from Surface to TD
.7
20.0
From Colour ToMD
37 300
CDl-06 (CD1-06raÐIJ 4
400 501
500 750
750 1000
1000 1250
1250 1500
1500 1750
1750 2000
000 2500
3000
3500
4000
4500
5000
5500
6500
7500
8500
9500
10000
10500
9iY'" 11000
11000 12000
12000 13000
15.0
10.0
5.0
o 27
D1-09(C
5.0
10.0
120
20.0
.7
18
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [10ft/in]
CDI-08 (wp-02)
Approved Plan
~alliburton Sperry-su!t
Anticollision Report
S5p&n""Y-S5~
I:U:!I.b.bJN.ήfiBV' CD
;.j, IµB·~I¡lq~·U::<"" QIIoW'.\.. '....-
NO GLOBAL SCAN: Using user defined selection & scan criteria
Interpolation Method: MD Interval: 50.00 It
Depth Range: 36.50 to 17264.04 ft
Maximum Radius: 1922.75 It
Plan: CD1-08 (wp02) & NOT PLANNED P GR.
ISCW SA Ellipse
Trav Cylinder North
Ellipse + Casing
3464.78 2390.00 9.625 12.250 9 5/8" Csg Pt @ 3465'MD
12457.00 6921.11 7.000 8.500 7" Csg Pt @ 12457' MD
15800.00 6934.09 6.125 6.125 Open Hole
Plan: CD1-08 (wp02) Date Composed: 9/22/2003
Version: 7
Principal: Yes Tied-to: From Well Ref. Point
Alpine CD1 CD1-01 CD1-01 V1 300.56 300.00 70.08 4.85 65.23 Pass: Major Risk
Alpine CD1 CD1-01 CD1-01PB1 V1 300.56 300.00 70.08 4.85 65.23 Pass: Major Risk
Alpine CD1 CD1-02 CD1-02 V2 350.26 350.00 61.02 5.81 55.21 Pass: Major Risk
Alpine CD1 CD1-03 CD1-03 V1 349.85 350.00 50.01 5.65 44.36 Pass: Major Risk
Alpine CD1 CD1-04 CD1-04 V1 250.19 250.00 41.13 4.50 36.63 Pass: Major Risk
Alpine CD1 CD1-05 CD1-05 V1 400.16 400.00 29.02 5.88 23.14 Pass: Major Risk
Alpine CD1 CD1-05 CD1-05PB1 V1 400.16 400.00 29.02 5.88 23.14 Pass: Major Risk
Alpine CD1 CD1-06 CD1-06 V1 350.03 350.00 20.90 5.71 15.19 Pass: Major Risk
Alpine CD1 CD1-06 CD1-06PB1 V1 350.03 350.00 20.90 5.71 15.19 Pass: Major Risk
Alpine CD1 CD1-09 CD1- 09PB1 V1 300.06 300.00 9.90 5.05 4.85 Pass: Major Risk
Alpine CD1 CD1-09 CD1-09 V2 300.06 300.00 9.90 5.05 4.85 Pass: Major Risk
Alpine CD1 CDHO CD1-10 V1 299.72 300.00 20.81 5.20 15.61 Pass: Major Risk
Alpine CD1 CD1-13 CD1-13 V1 348.97 350.00 50.08 5.62 44.46 Pass: Major Risk
Alpine CD1 CD1-14 CD1-14 GYRO VO 249.51 250.00 61.26 5.10 56.15 Pass: Major Risk
Alpine CD1 CD1-14 CD1-14 MWD VO 36.50 36.80 60.06 No Offset Stations
Alpine CD1 CD1-14 CD1-14 PB1 MWD V1 36.50 36.80 60.06 No Offset Stations
Alpine CD1 CD1-14 CDH4 PB1 V1 249.51 250.00 61.26 5.10 56.15 Pass: Major Risk
Alpine CD1 CD1-14 CD1-14 V1 249.51 250.00 61.26 5.10 56.15 Pass: Major Risk
Alpine CD1 CD1-16 CD1-16 V1 546.72 550.00 79.89 8.81 71.08 Pass: Major Risk
Alpine CD1 CD1-16 CD1-16PB1 V1 546.72 550.00 79.89 8.81 71.08 Pass: Major Risk
Alpine CD1 CD1-17 CD1-17 V2 397.99 400.00 89.93 6.24 83.69 Pass: Major Risk
Alpine CD1 CD1-19 CD1-19 V2 296.70 300.00 110.70 4.87 105.82 Pass: Major Risk
Alpine CD1 CD1-19 CD4-19A V4 299.10 300.00 110.72 4.91 105.81 Pass: Major Risk
Alpine CD1 CD1-21 CD'-21 V1 347.88 350.00 130.22 5.86 124.37 Pass: Major Risk
Alpine CD1 CD1-21 CD1-21L1 V1 347.88 350.00 130.22 5.86 124.37 Pass: Major Risk
Alpine CD1 CD1-21 CD1-21 PB1 V1 347.88 350.00 130.22 5.86 124.37 Pass: Major Risk
Alpine CD1 CD1-229 (aka NQ1) CD1-229 PB1 V1 199.93 200.00 210.59 3.48 207.11 Pass: Major Risk
Alpine CD1 CD1-229 (aka NQ1) CD1-229 V1 199.93 200.00 210.59 3.48 207.11 Pass: Major Risk
Alpine CD1 CD1-22 CD1-22 V6 299.18 300.00 140.90 5.21 135.69 Pass: Major Risk
Alpine CD1 CD1-22 CD1-22A V6 299.18 300.00 140.90 5.21 135.69 Pass: Major Risk
Alpine CD1 CD1-23 CD1-23 V3 923.27 950.00 146.45 17.23 129.22 Pass: Major Risk
Alpine CD1 CD1-24 CDI-24 V2 249.99 250.00 160.38 1.77 158.61 Pass: Minor 1/10
Alpine CD1 CD1-25 CD1-25 V1 348.26 350.00 169.98 5.41 164.57 Pass: Major Risk
Alpine CD1 CD1-26 CD1-26 V1 250.00 250.00 180.50 4.39 176.11 Pass: Major Risk
Alpine CD1 CD1-26 CDI-26PB1 V1 250.00 250.00 180.50 4.39 176.11 Pass: Major Risk
Alpine CD1 CD1-27 CD1-27 V1 249.80 250.00 190.28 4.40 185.88 Pass: Major Risk
Alpine CD1 CD1-28 CD1-28 PB1 V1 395.89 400.00 197.89 6.37 191.52 Pass: Major Risk
Alpine CD1 CD1-28 CD1-28 V1 395.89 400.00 197.89 6.37 191.52 Pass: Major Risk
Alpine CD1 CD1-30 CD1-30 PB1 V1 250.00 250.00 221.43 4.56 216.88 Pass: Major Risk
Alpine CD1 CD1-30 CD1-30 V1 250.00 250.00 221.43 4.56 216.88 Pass: Major Risk
Alpine CD1 CD1-31 CD1-31 CAZV1 540.57 550.00 231.15 8.23 222.93 Pass: Major Risk
Alpine CD1 CD1-31 CD1-31 IIFR V1 540.57 550.00 231.15 8.23 222.92 Pass: Major Risk
Alpine CD1 CD1-31 CD1-31 V6 540.57 550.00 231.16 8.16 223.00 Pass: Major Risk
Alpine CD1 CD1-32 CD1-32 PB1 V3 347.58 350.00 240.12 5.25 234.87 Pass: Major Risk
Alpine CD1 CD1-32 CD1-32 V1 347.58 350.00 240.12 5.25 234.87 Pass: Major Risk
Alpine CD1 CD1-33 CD1-33 V1 347.49 350.00 250.50 5.35 245.15 Pass: Major Risk
ORIGINAL
_ e
Halliburton Sperry-Sun
Anticollision Report
S:EI"'T"Y-!iiLn
RfW""J;.II\IG. sefl!\I~
o,~\lnþll'l¡I;nt"<.:>;......!i."'''
Alpine CD1 Plan: CD1-07 CD1-07 PB1 V10 Plan: C 349.92 350.00 10.18 6.72 3.46 Pass: Major Risk
Alpine CD1 Plan: CD1-07 CD1-07 V2 Plan: CD1-07 349.92 350.00 10.18 6.87 3.31 Pass: Major Risk
Alpine CD1 Prelim: CD1-11 CD1-11 VO Plan: CD1-11 349.76 350.00 30.54 6.08 24.45 Pass: Major Risk
Alpine CD1 Prelim: CD1-12 CD1-12 VO Plan: CD1-12 299.76 300.00 40.15 6.14 34.00 Pass: Major Risk
Alpine CD1 Prelim: CD1-18 CD'I-18 VO Plan: CD1-18 348.74 350.00 100.41 6.86 93.55 Pass: Major Risk
Alpine CD1 Prelim: CD1-20 CD1-20 VO Plan: CD1-20 299.34 300.00 120.13 5.88 114.25 Pass: Major Risk
ORIGINAL
_ e
Halliburton Sperry-Sun
Anticollision Report
&p&!I'"'I""'V"&iLr1
P ..11...1...1 Nil &IE.ftYl!:]I~
. 1~~__~_I.'II1~ O:_~II\"'."'''lo
NO GLOBAL SCAN: Using user defined selection & scan criteria
Interpolation Method: MD Interval: 50.00 ft
Depth Range: 36.50 to 17264.04 ft
Maximum Radius: 1781.17 ft
Plan: CD1-08 (wp02) & NOT PLANNED P GR.
ISCWSA Ellipse
Trav Cylinder North
Ellipse + Casing
Casing Points
9 5/8" Csg Pt @ 3465'MD
7" Csg Pt @ 12457' MD
Open Hole
CD1-08 (wp02)
Date Composed:
Version:
Tied-to:
9/22/2003
7
From Well Ref. Point
Yes
Alpine CD1
CD1-24
CD1-24 V1
11973.61 13706.34 256.54 534.00 -277.45 FAIL: Major Risk
Site: Alpine CD1
WeD: CD1-24
WeDpath: CD1-24 V1
Rule Assigned:
Inter-Site Error:
Major Risk
0.00 ft
56.00 56.00 56.01 56.01 0.02 0.00 224.18 224.18 159.98 1.16 158.81 Pass
99.99 99.99 100.00 100.00 0.07 0.03 224.22 224.22 160.03 1.80 158.23 Pass
149.99 149.99 150.00 150.00 0.19 0.03 224.32 224.32 160.15 2.60 157.55 Pass
199.99 199.99 200.00 200.00 0.30 0.03 224.42 224.42 160.26 3.39 156.87 Pass
249.99 249.99 250.00 250.00 0.41 0.04 224.52 224.52 160.38 4.20 156.18 Pass
299.05 299.04 300.00 300.00 0.44 0.06 224.92 99.92 160.67 4.78 155.88 Pass
347.97 347.90 350.00 349.99 0.42 0.10 225.92 100.92 161.28 5.26 156.02 Pass
396.65 396.40 400.00 399.99 0.39 0.15 227.49 102.49 162.31 5.74 156.57 Pass
445.02 444.42 450.00 449.99 0.44 0.18 229.50 104.50 163.64 6.39 157.25 Pass
493.07 491.90 500.00 499.99 0.49 0.22 231.82 106.82 165.17 7.05 158.13 Pass
540.79 538.80 550.00 549.94 0.59 0.26 234.34 109.34 166.80 7.89 158.91 Pass
588.21 585.08 600.00 599.83 0.70 0.29 236.97 111.97 168.40 8.74 159.66 Pass
635.29 630.66 650.00 649.61 0.83 0.34 239.76 114.76 170.13 9.70 160.43 Pass
681.98 675.46 700.00 699.29 0.97 0.40 242.75 117.75 172.21 10.67 161.53 Pass
728.24 719.40 750.00 748.84 1.13 0.49 245.92 120.92 174.78 11.70 163.08 Pass
774.04 762.43 800.00 798.27 1.31 0.60 249.24 124.24 177.99 12.70 165.29 Pass
819.42 804.54 850.00 847.49 1.49 0.73 252.62 127.62 181.72 13.73 167.99 Pass
864.45 845.77 900.00 896.41 1.69 0.87 255.95 130.95 185.75 14.73 171.01 Pass
909.12 886.10 950.00 944.97 1.86 1.04 259.23 134.23 189.99 15.67 174.32 Pass
953.46 925.53 1000.00 993.05 1.97 1.24 262.48 137.48 194.22 16.43 177.79 Pass
1000.00 966.20 1050.00 1040.52 2.09 1.47 265.71 140.71 198.25 17.20 181.05 Pass
1041.23 1001.60 1100.00 1087.32 2.11 1.72 268.94 143.94 202.07 17.72 184.36 Pass
1084.54 1038.12 1150.00 1133.53 2.14 2.00 272.28 147.28 206.10 18.20 187.90 Pass
1127.18 1073.37 1200.00 1179.43 2.19 2.25 275.89 150.89 211.15 18.60 192.55 Pass
1168.98 1107.22 1250.00 1225.28 2.25 2.47 279.75 154.75 218.10 18.91 199.19 Pass
1209.98 1139.71 1300.00 1271.09 2.32 2.72 283.59 158.59 227.18 19.30 207.88 Pass
1250.36 1171.00 1350.00 1316.72 2.41 3.00 287.21 162.21 238.01 19.81 218.20 Pass
1290.15 1201.11 1400.00 1362.07 2.50 3.30 290.57 165.57 250.28 20.38 229.90 Pass
1329.25 1229.99 1450.00 1407.28 2.61 3.54 293.68 168.68 264.25 20.95 243.30 Pass
1367.59 1257.60 1500.00 1452.45 2.72 3.79 296.49 171.49 280.05 21.61 258.45 Pass
ORIGINAL
_ e
Halliburton Sperry-Sun
Anticollision Report
spe""""y-sun
CflII...L.lNI ..u!\vn:e:¡
~ ~~~~.~'.'lÐh,.. ~~Iir:"""
1400.00 1280.38 1550.00 1497.10 2.82 4.11 299.10 174.10 296.65 22.33 274.32 Pass
1442.63 1309.53 1600.00 1541.14 2.98 4.45 301.53 176.53 313.68 23.24 290.44 Pass
1479.19 1333.79 1650.00 1584.91 3.11 4.79 303.78 178.78 331.96 24.15 307.81 Pass
1515.89 1357.44 1700.00 1628.12 3.25 5.16 305.69 181.22 350.92 25.12 325.80 Pass
1553.37 1380.99 1750.00 1670.79 3.40 5.56 307.12 183.87 370.34 26.19 344.15 Pass
1590.80 1403.91 1800.00 1712.80 3.55 5.98 308.34 186.26 389.97 27.31 362.66 Pass
1628.24 1426.22 1850.00 1753.87 3.70 6.43 309.41 188.47 409.39 28.50 380.89 Pass
1665.73 1447.94 1900.00 1793.80 3.86 6.90 310.38 190.55 428.40 29.77 398.63 Pass
1700.00 1467.22 1950.00 1832.45 4.00 7.41 311.32 192.48 446.84 31.10 415.74 Pass
1741.10 1469.62 2000.00 1869.72 4.17 7.95 312.09 194.39 464.54 32.60 431.93 Pass
1781.46 1510.87 2050.00 1905.54 4.35 8.51 312.96 196.00 481 .43 34.24 447.20 Pass
1827.77 1535.06 2100.00 1939.97 4.58 9.07 314.19 197.23 497.09 36.18 460.91 Pass
1874.43 1559.43 2150.00 1973.13 4.82 9.66 315.42 198.46 511.42 38.25 473.17 Pass
1921.51 1584.02 2200.00 2005.25 5.06 10.26 316.60 199.64 524.44 40.39 484.05 Pass
1968.87 1608.75 2250.00 2036.80 5.31 10.84 317.71 200.75 536.74 42.55 494.19 Pass
2016.33 1633.53 2300.00 2068.23 5.56 11.42 318.76 201.79 548.96 44.74 504.22 Pass
2063.94 1658.40 2350.00 2099.41 5.81 12.02 319.75 202.78 560.87 47.01 513.86 Pass
2111.67 1683.32 2400.00 2130.52 6.07 12.58 320.67 203.70 572.68 49.22 523.47 Pass
2159.40 1708.26 2450.00 2161.77 6.32 13.08 321.53 204.57 584.72 51.37 533.35 Pass
2207.16 1733.20 2500.00 2193.03 6.58 13.65 322.36 205.39 596.85 53.64 543.20 Pass
2254.95 1758.16 2550.00 2224.29 6.84 14.22 323.14 206.17 609.02 55.95 553.07 Pass
2302.77 1783.13 2600.00 2255.57 7.10 14.81 323.88 206.91 621.27 58.29 562.98 Pass
2350.63 1808.13 2650.00 2286.41 7.36 15.45 324.63 207.66 633.20 60.77 572.43 Pass
2398.53 1833.14 2700.00 2316.63 7.63 16.09 325.40 208.43 644.68 63.34 581.35 Pass
2446.41 1858.15 2750.00 2346.95 7.89 16.68 326.14 209.17 656.41 65.83 590.58 Pass
2494.24 1883.13 2800.00 2377.54 8.15 17.27 326.83 209.87 668.53 68.33 600.20 Pass
2542.08 1908.11 2850.00 2408.13 8.42 17.87 327.50 210.54 680.74 70.86 609.88 Pass
2589.91 1933.09 2900.00 2438.72 8.68 18.43 328.15 211.19 693.05 73.36 619.69 Pass
2637.71 1958.05 2950.00 2469.33 8.95 19.00 328.78 211 .82 705.55 75.88 629.67 Pass
2685.45 1982.99 3000.00 2500.11 9.22 19.55 329.39 212.42 718.36 78.37 639.98 Pass
2733.15 2007.90 3050.00 2531.03 9.48 20.11 329.97 213.00 731.44 80.89 650.56 Pass
2780.80 2032.79 3100.00 2562.02 9.75 20.66 330.53 213.56 744.74 83.41 661.33 Pass
2828.43 2057.66 3150.00 2593.11 10.02 21.22 331.07 214.10 758.23 85.95 672.29 Pass
2876.04 2082.53 3200.00 2624.22 10.28 21.81 331.58 214.62 771.84 88.55 683.29 Pass
2923.65 2107.39 3250.00 2655.30 10.55 22.42 332.09 215.12 785.50 91.19 694.31 Pass
2971.24 2132.24 3300.00 2686.45 10.82 22.99 332.57 215.61 799.30 93.78 705.52 Pass
3018.81 2157.09 3350.00 2717.72 11.08 23.55 333.03 216.07 813.26 96.34 716.92 Pass
3066.39 2181.93 3400.00 2748.99 11.35 24.15 333.48 216.51 827.27 98.97 728.30 Pass
3113.97 2206.79 3450.00 2780.26 11.62 24.75 333.90 216.94 841.31 101.60 739.71 Pass
3161.56 2231.64 3500.00 2811.55 11.89 25.34 334.32 217.35 855.39 104.23 751.16 Pass
3209.14 2256.49 3550.00 2842.87 12.16 25.94 334.71 217.74 869.56 106.88 762.69 Pass
3256.69 2281.32 3600.00 2874.29 12.43 26.51 335.09 218.12 883.88 109.46 774.42 Pass
3304.24 2306.15 3650.00 2905.73 12.69 27.11 335.46 218.49 898.25 112.10 786.15 Pass
3351.79 2330.99 3700.00 2937.23 12.96 27.71 335.81 218.84 912.70 114.74 797.96 Pass
3399.31 2355.81 3750.00 2968.91 13.23 28.27 336.14 219.17 927.31 117.30 810.01 Pass
3446.83 2380.62 3800.00 3000.65 13.50 28.87 336.45 219.48 942.00 119.92 822.08 Pass
3494.42 2405.48 3850.00 3031.84 13.77 29.50 336.79 219.82 956.28 122.65 833.63 Pass
3542.07 2430.36 3900.00 3062.48 14.04 30.13 337.15 220.18 970.16 125.17 844.99 Pass
3589.72 2455.25 3950.00 3093.15 14.31 30.74 337.49 220.53 984.10 127.92 856.18 Pass
3637.34 2480.12 4000.00 3123.92 14.58 31.33 337.83 220.86 998.21 130.61 867.59 Pass
o RIG I NA L
~aIliburton sperry-sun·
Anticollision Report
liiFJEllT'Y-SLn
p"II.,b.INø.=~
\ ff....um,.;:ft!<!'i ~"AQ'~"....-
Site: Alpine CD1
Well: CD1-24
Wellpath: CD1-24 V1
Rule Assigned: Major Risk
Inter-Site Error: 0.00 ft
3684.92 2504.96 4050.00 3154.82 14.85 31.92 338.15 221.18 1012.52 133.31 879.21 Pass
3732.45 2529.79 4100.00 3185.87 15.12 32.50 338.46 221 .49 1027.04 136.00 891.04 Pass
3779.97 2554.61 4150.00 3216.97 15.39 33.09 338.75 221.79 1041.65 138.68 902.97 Pass
3827.70 2579.54 4200.00 3247.60 15.66 33.70 339.05 222.08 1055.50 141.43 914.06 Pass
3875.70 2604.60 4250.00 3277.68 15.93 34.34 339.34 222.38 1068.41 144.23 924.17 Pass
3923.75 2629.70 4300.00 3307.78 16.21 34.95 339.62 222.66 1081.18 146.99 934.19 Pass
3971.82 2654.80 4350.00 3338.07 16.48 35.55 339.88 222.92 1094.03 149.69 944.34 Pass
4019.88 2679.90 4400.00 3368.60 16.75 36.15 340.12 223.16 1107.03 152.37 954.65 Pass
4067.91 2704.98 4450.00 3399.43 17.03 36.75 340.34 223.37 1120.28 155.04 965.24 Pass
4115.87 2730.04 4500.00 3430.48 17.30 37.35 340.55 223.58 1133.80 157.69 976.11 Pass
4163.81 2755.07 4550.00 3461.58 17.57 37.96 340.75 223.78 1147.44 160.36 987.08 Pass
4211.72 2780.09 4600.00 3492.78 17.85 38.57 340.94 223.97 1161.21 163.02 998.19 Pass
4259.59 2805.09 4650.00 3524.13 18.12 39.17 341.12 224.15 1175.17 165.65 1009.52 Pass
4307.43 2830.08 4700.00 3555.53 18.39 39.76 341.30 224.33 1189.24 168.27 1020.97 Pass
4355.25 2855.05 4750.00 3586.96 18.66 40.35 341.47 224.51 1203.38 170.89 1032.50 Pass
4403.14 2880.06 4800.00 3617.55 18.94 40.97 341.68 224.72 1217.01 173.65 1043.36 Pass
4451.12 2905.12 4850.00 3647.13 19.21 41.61 341.94 224.98 1229.98 176.55 1053.42 Pass
4499.11 2930.18 4900.00 3676.45 19.48 42.26 342.21 225.24 1242.80 179.50 1063.30 Pass
4547.09 2955.24 4950.00 3705.80 19.76 42.90 342.47 225.50 1255.67 182.41 1073.26 Pass
4595.04 2980.29 5000.00 3735.40 20.03 43.52 342.71 225.74 1268.77 185.28 1083.49 Pass
4642.93 3005.29 5050.00 3765.10 .20.30 44.14 342.95 225.98 1282.15 188.13 1094.02 Pass
4690.62 3030.20 5100.00 3794.84 20.58 44.74 343.20 226.23 1296.08 190.99 1105.09 Pass
4738.16 3055.03 5150.00 3824.63 20.85 45.35 343.45 226.48 1310.49 193.86 1116.63 Pass
4785.68 3079.85 5200.00 3854.43 21.12 45.97 343.69 226.72 1324.99 196.78 1128.21 Pass
4833.20 3104.66 5250.00 3884.22 21.39 46.59 343.93 226.97 1339.49 199.69 1139.80 Pass
4880.70 3129.47 5300.00 3914.12 21.66 47.20 344.16 227.20 1354.12 202.57 1151.55 Pass
4928.17 3154.26 5350.00 3944.14 21.93 47.81 344.39 227.42 1368.90 205.44 1163.46 Pass
4975.64 3179.05 5400.00 3974.09 22.20 48.43 344.61 227.64 1383.68 208.34 1175.34 Pass
5023.10 3203.84 5450.00 4004.05 22.47 49.06 344.83 227.86 1398.52 211.25 1187.27 Pass
5070.52 3228.61 5500.00 4034.22 22.74 49.67 345.03 228.06 1413.54 213.77 1199.77 Pass
5117.91 3253.35 5550.00 4064.92 23.01 50.27 345.21 228.24 1428.88 216.09 1212.79 Pass
5165.24 3278.08 5600.00 4096.26 23.28 50.86 345.35 228.38 1444.58 218.32 1226.25 Pass
5212.55 3302.78 5650.00 4127.84 23.55 51.46 345.48 228.51 1460.43 220.53 1239.90 Pass
5259.85 3327.49 5700.00 4159.43 23.82 52.06 345.61 228.64 1476.30 222.75 1253.55 Pass
5307.17 3352.20 5750.00 4190.98 24.10 52.66 345.73 228.76 1492.13 224.98 1267.15 Pass
5354.46 3376.89 5800.00 4222.60 24.37 53.25 345.85 228.88 1508.07 227.19 1280.88 Pass
5401.70 3401.57 5850.00 4254.21 24.64 53.84 345.97 229.00 1524.12 229.40 1294.72 Pass
5448.89 3426.21 5900.00 4285.88 24.90 54.43 346.09 229.12 1540.35 231.61 1308.73 Pass
5495.99 3450.81 5950.00 4317.74 25.17 55.02 346.20 229.23 1556.86 233.80 1323.05 Pass
5543.16 3475.44 6000.00 4349.64 25.44 55.59 346.31 229.34 1573.21 235.95 1337.25 Pass
5590.49 3500.16 6050.00 4381.53 25.71 56.16 346.40 229.43 1589.12 238.07 1351.05 Pass
5637.88 3524.91 6100.00 4413.47 25.99 56.74 346.48 229.52 1604.89 240.20 1364.69 Pass
5685.25 3549.65 6150.00 4445.50 26.26 57.33 346.56 229.60 1620.73 242.34 1378.39 Pass
5732.60 3574.38 6200.00 4477.63 26.53 57.92 346.64 229.67 1636.64 244.47 1392.17 Pass
5779.90 3599.09 6250.00 4509.84 26.80 58.51 346.71 229.74 1652.70 246.59 1406.11 Pass
5827.17 3623.77 6300.00 4541.96 27.07 59.09 346.79 229.82 1668.86 248.72 1420.14 Pass
5874.41 3648.44 6350.00 4573.89 27.34 59.67 346.87 229.91 1685.03 250.86 1434.17 Pass
5921.63 3673.11 6400.00 4605.83 27.61 60.25 346.96 229.99 1701.28 253.02 1448.25 Pass
5968.82 3697.75 6450.00 4637.88 27.88 60.85 347.04 230.07 1717.63 255.19 1462.44 Pass
6015.99 3722.38 6500.00 4670.08 28.15 61.43 347.11 230.15 1734.09 257.33 1476.76 Pass
6063.12 3747.00 6550.00 4702.41 28.42 62.02 347.18 230.21 1750.64 259.45 1491.19 Pass
RiGINAL
-Halliburton Sperry-su!Þ
Anticollision Report
~ U'~~i"'JüIØ< ~".\c""
Sp&!l""'I""'y-sun
A!!JJ.."I~Ii· se~$
6110.23 3771.60 6600.00 4734.84 28.69 62.61 347.24 230.27 1767.29 261.57 1505.72 Pass
10463.77 6045.26 11500.00 6919.43 53.62 120.61 351.10 234.13 1749.45 459.06 1290.39 Pass
10498.47 6063.39 11550.00 6917.43 53.82 121.17 351.21 234.24 1713.60 461.01 1252.59 Pass
10532.90 6081.37 11600.00 6915.65 54.02 121.74 351.29 234.32 1677.44 462.85 1214.59 Pass
10567.22 6099.29 11650.00 6914.69 54.21 122.30 351.33 234.36 1641.10 464.49 1176.60 Pass
10601.41 6117.15 11700.00 6913.98 54.41 122.86 351.35 234.39 1604.63 466.05 1138.58 Pass
10635.51 6134.96 11750.00 6913.00 54.61 123.42 351.39 234.42 1568.07 467.64 1100.43 Pass
10669.91 6152.92 11800.00 6912.14 54.80 123.97 351.43 234.47 1531.80 469.29 1062.51 Pass
10704.79 6171.14 11850.00 6911.59 55.00 124.53 351.49 234.52 1496.01 471.01 1025.00 Pass
10739.87 6189.46 11900.00 6911.29 55.20 125.09 351.55 234.58 1460.41 472.75 987.66 Pass
10775.06 6207.84 11950.00 6911.16 55.41 125.67 351.60 234.63 1424.92 474.51 950.41 Pass
10810.61 6226.41 12000.00 6910.86 55.61 126.25 351.69 234.73 1389.84 476.47 913.37 Pass
10846.44 6245.12 12050.00 6910.30 55.81 126.84 351.82 234.86 1355.10 478.61 876.49 Pass
10881.89 6263.63 12100.00 6909.64 56.02 127.43 351.95 234.98 1319.96 480.71 839.25 Pass
10917.02 6281.98 12150.00 6908.85 56.22 128.01 352.06 235.09 1284.47 482.77 801.70 Pass
10952.31 6300.41 12200.00 6907.88 56.42 128.60 352.20 235.23 1249.19 484.97 764.22 Pass
10987.75 6318.92 12250.00 6906.68 56.62 129.20 352.38 235.41 1214.13 487.37 726.76 Pass
11023.23 6337.45 12300.00 6905.18 56.83 129.80 352.60 235.63 1179.19 489.95 689.23 Pass
11058.66 6355.95 12350.00 6903.94 57.03 130.40 352.80 235.83 1144.15 492.47 651.68 Pass
11093.85 6374.33 12400.00 6903.78 57.23 131.00 352.91 235.95 1108.72 494.59 614.13 Pass
11129.15 6392.77 12450.00 6903.96 57.44 131.59 353.02 236.05 1073.36 496.64 576.72 Pass
11164.85 6411.41 12500.00 6903.85 57.64 132.18 353.18 236.22 1038.49 498.99 539.50 Pass
11200.96 6430.27 12550.00 6903.89 57.85 132.78 353.39 236.42 1004.09 501.53 502.55 Pass
11237.45 6449.33 12600.00 6904.29 58.06 133.38 353.61 236.64 970.12 504.17 465.95 Pass
11273.80 6468.31 12650.00 6904.64 58.26 133.97 353.83 236.86 935.98 506.84 429.15 Pass
11309.84 6487.13 12700.00 6904.84 58.47 134.57 354.06 237.09 901.52 509.51 392.01 Pass
11346.05 6506.04 12750.00 6905.45 58.68 135.17 354.28 237.31 867.22 512.18 355.04 Pass
11382.58 6525.12 12800.00 6906.61 58.89 135.77 354.50 237.53 833.22 514.83 318.39 Pass
11419.52 6544.41 12850.00 6908.44 59.10 136.37 354.71 237.74 799.66 517.47 282.19 Pass
11456.65 6563.81 12900.00 6910.87 59.31 136.97 354.89 237.92 766.27 519.97 246.31 Pass
11493.02 6582.80 12950.00 6913.61 59.52 137.56 354.97 238.00 731.98 521.96 210.02 Pass
11528.83 6601.50 13000.00 6916.51 59.73 138.14 354.97 238.00 697.09 523.58 173.51 Pass
11565.00 6620.39 13050.00 6919.23 59.93 138.72 355.04 238.07 662.58 525.50 137.08 Pass
11601.26 6639.33 13100.00 6921.75 60.14 139.31 355.15 238.18 628.18 527.63 100.54 Pass
11637.10 6658.05 13150.00 6924.07 60.35 139.89 355.25 238.28 593.33 529.69 63.64 Pass
11667.71 6674.03 13200.00 6926.23 60.52 140.47 355.35 238.38 558.27 531.68 26.59 Pass
11700.00 6690.66 13250.00 6928.28 60.69 140.81 356.20 237.73 523.67 533.00 -9.32 FAIL
11721.14 6701.29 13300.00 6930.20 60.75 141.21 356.83 237.39 489.78 534.23 -44.45 FAIL
11747.69 6714.34 13350.00 6931.99 60.82 141.53 357.60 236.97 456.69 535.36 -78.66 FAIL
11775.49 6727.65 13400.00 6934.09 60.90 141.80 358.41 236.54 424.73 536.31 -111.58 FAIL
11800.00 6739.08 13450.00 6936.63 60.97 142.07 359.12 236.19 394.11 537.14 -143.03 FAIL
11834.87 6754.81 13500.00 6939.08 60.97 142.14 0.11 235.68 364.38 537.12 -172.75 FAIL
11866.27 6768.46 13550.00 6941.36 60.97 142.22 1.04 235.29 335.67 537.21 -201.54 FAIL
11900.00 6782.55 13600.00 6944.17 60.97 142.20 2.03 234.88 308.68 536.96 -228.28 FAIL
11933.50 6795.94 13650.00 6947.49 60.88 142.11 3.00 234.49 283.44 535.92 -252.47 FAIL
11969.02 6809.49 13700.00 6950.81 60.78 141.80 4.02 234.08 259.48 534.24 -274.75 FAIL
11973.61 6811.19 13706.34 6951.23 60.77 141.76 4.15 234.03 256.54 534.00 -277.45 FAIL
ORIGINAL
-. .
HallIburton Sperry -Sun
GeoReport
5iiFJfii!l""r'V-5iiun
p en"" I,. I III Ii JiJU\.)tJJ;JU!
~ ff"',.,'m'l¡I:ft_~ ~)''''~'''''-
Survey:
Start Date:
Company:
Tool:
Engineer:
Tied-to:
36.50 0.000 0.000 36.50 -19.50 0.00 0.00 5975855.414 385950.509 SL= 272'FNL & 2757'FEL; S
100.00 0.000 0.000 100.00 44.00 0.00 0.00 5975855.414 385950.509
200.00 0.000 0.000 200.00 144.00 0.00 0.00 5975855.414 385950.509
250.00 0.000 0.000 250.00 194.00 0.00 0.00 5975855.414 385950.509
300.00 2.000 125.000 299.99 243.99 -0.50 0.71 5975854.903 385951.216
400.00 6.000 125.000 399.73 343.73 -4.50 6.43 5975850.816 385956.867
500.00 10.000 125.000 498.73 442.73 -12.48 17.83 5975842.664 385968.142
600.00 14.000 125.000 596.53 540.53 -24.40 34.85 5975830.484 385984.985
700.00 18.000 125.000 692.63 636.63 -40.21 57.43 5975814.337 386007.314
800.00 22.000 125.000 786.58 730.58 -59.82 85.44 5975794.302 386035.021
900.00 26.000 125.000 877.92 821 .92 -83.15 118.75 5975770.475 386067.971
1000.00 30.000 125.000 966.20 910.20 -110.07 157.20 5975742.973 386106.002
1100.00 34.000 125.000 1050.98 994.98 -140.46 200.60 5975711.930 386148.931
1200.00 38.000 125.000 1131.87 1075.87 -174.17 248.74 5975677.497 386196.547
1300.00 42.000 125.000 1208.46 1152.46 -211.03 301 .38 5975639.843 386248.619
1400.00 46.000 125.000 1280.38 1224.38 -250.86 358.27 5975599.149 386304.893
1500.00 50.000 125.000 1347.28 1291.28 -293.48 419.13 5975555.616 386365.095
1600.00 53.115 121.795 1409.45 1353.45 -336.54 484.53 5975511.571 386429.820
1700.00 56.310 118.845 1467.22 1411.22 -377.70 554.99 5975469.348 386499.640
1767.88 58.516 116.967 1503.78 1447.78 -404.45 605.53 5975441.831 386549.763
1800.00 58.516 116.967 1520.55 1464.55 -416.87 629.94 5975429.040 386573.984
1900.00 58.516 116.967 1572.78 1516.78 -455.55 705.95 5975389.220 386649.387
2000.00 58.516 116.967 1625.01 1569.01 -494.22 781.96 5975349.399 386724.789
2100.00 58.516 116.967 1677.23 1621.23 -532.89 857.96 5975309.579 386800.192
2200.00 58.516 116.967 1729.46 1673.46 -571.56 933.97 5975269.758 386875.595
2300.00 58.516 116.967 1781.68 1725.68 -610.23 1009.97 5975229.938 386950.997
2400.00 58.516 116.967 1833.91 1777.91 -648.91 1085.98 5975190.117 387026.400
2500.00 58.516 116.967 1886.13 1830.13 -687.58 1161.99 5975150.297 387101.803
2600.00 58.516 116.967 1938.36 1882.36 -726.25 1237.99 5975110.476 387177.206
2700.00 58.516 116.967 1990.59 1934.59 -764.92 1314.00 5975070.656 387252.608
2800.00 58.516 116.967 2042.81 1986.81 -803.60 1390.01 5975030.835 387328.011
2900.00 58.516 116.967 2095.04 2039.04 -842.27 1466.01 5974991.015 387403.414
3000.00 58.516 116.967 2147.26 2091.26 -880.94 1542.02 5974951.194 387478.816
3064.60 58.516 116.967 2181.00 2125.00 -905.92 1591.12 5974925.471 387527.525 C-40
3100.00 58.516 116.967 2199.49 2143.49 -919.61 1618.02 5974911.374 387554.219
3200.00 58.516 116.967 2251.71 2195.71 -958.28 1694.03 5974871.553 387629.622
3300.00 58.516 116.967 2303.94 2247.94 -996.96 1770.04 5974831.733 387705.025
3400.00 58.516 116.967 2356.17 2300.17 -1035.63 1846.04 5974791.912 387780.427
3413.09 58.516 116.967 2363.00 2307.00 -1040.69 1855.99 5974786.701 387790.295 9 5/8" Csg Pt @ 3413'MD
3432.23 58.516 116.967 2373.00 2317.00 -1048.09 1870.54 5974779.077 387804.732 C-30
3500.00 58.516 116.967 2408.39 2352.39 -1074.30 1922.05 5974752.092 387855.830
3600.00 58.516 116.967 2460.62 2404.62 -1112.97 1998.06 5974712.271 387931.233
3700.00 58.516 116.967 2512.84 2456.84 -1151.64 2074.06 5974672.451 388006.635
3800.00 58.516 116.967 2565.07 2509.07 -1190.32 2150.07 5974632.630 388082.038
3900.00 58.516 116.967 2617.29 2561.29 -1228.99 2226.07 5974592.810 388157.441
4000.00 58.516 116.967 2669.52 2613.52 -1267.66 2302.08 5974552.989 388232.843
4100.00 58.516 116.967 2721.75 2665.75 -1306.33 2378.09 5974513.169 388308.246
4165.59 58.516 116.967 2756.00 2700.00 -1331.70 2427.94 5974487.051 388357.703 C-20
4200.00 58.516 116.967 2773.97 2717.97 -1345.00 2454.09 5974473.348 388383.649
ORIGINAL
~alliburton Sperry-Su!t
GeoReport
sp&r"'I""'y-sa..n
;JftlI..I"IN!It . Sel!'l\l"::IUI
'10 1RI,UII'III~t:i." l:QoP'."""'''
4300.00 58.516 116.967 2826.20 2770.20 -1383.68 2530.10 5974433.528 388459.052
4400.00 58.516 116.967 2878.42 2822.42 -1422.35 2606.11 5974393.707 388534.454
4500.00 58.516 116.967 2930.65 2874.65 -1461.02 2682.11 5974353.887 388609.857
4600.00 58.516 116.967 2982.87 2926.87 -1499.69 2758.12 5974314.066 388685.260
4700.00 58.516 116.967 3035.10 2979.10 -1538.36 2834.12 5974274.246 388760.662
4800.00 58.516 116.967 3087.33 3031.33 -1577.04 2910.13 5974234.425 388836.065
4900.00 58.516 116.967 3139.55 3083.55 -1615.71 2986.14 5974194.605 388911.468
5000.00 58.516 116.967 3191.78 3135.78 -1654.38 3062.14 5974154.784 388986.871
5100.00 58.516 116.967 3244.00 3188.00 -1693.05 3138.15 5974114.964 389062.273
5200.00 58.516 116.967 3296.23 3240.23 -1731.72 3214.16 5974075.143 389137.676
5300.00 58.516 116.967 3348.45 3292.45 -1770.40 3290.16 5974035.323 389213.079
5400.00 58.516 116.967 3400.68 3344.68 -1809.07 3366.17 5973995.502 389288.481
5500.00 58.516 116.967 3452.90 3396.90 -1847.74 3442.18 5973955.682 389363.884
5600.00 58.516 116.967 3505.13 3449.13 -1886.41 3518.18 5973915.861 389439.287
5700.00 58.516 116.967 3557.36 3501.36 -1925.08 3594.19 5973876.041 389514.690
5800.00 58.516 116.967 3609.58 3553.58 -1963.76 3670.19 5973836.220 389590.092
5900.00 58.516 116.967 3661.81 3605.81 -2002.43 3746.20 5973796.400 389665.495
6000.00 58.516 116.967 3714.03 3658.03 -2041.10 3822.21 5973756.579 389740.898
6100.00 58.516 116.967 3766.26 3710.26 -2079.77 3898.21 5973716.759 389816.300
6132.06 58.516 116.967 3783.00 3727.00 -2092.17 3922.58 5973703.994 389840.471 K-3 Marker
6200.00 58.516 116.967 3818.48 3762.48 -2118.44 3974.22 5973676.938 389891.703
6300.00 58.516 116.967 3870.71 3814.71 -2157.12 4050.23 5973637.118 389967.106
6400.00 58.516 116.967 3922.94 3866.94 -2195.79 4126.23 5973597.297 390042.508
6497.78 58.516 116.967 3974.00 3918.00 -2233.60 4200.55 5973558.362 390116.234 Basal K-3 SS
6500.00 58.516 116.967 3975.16 3919.16 -2234.46 4202.24 5973557.477 390117.911
6583.94 58.516 116.967 4019.00 3963.00 -2266.92 4266.04 5973524.051 390181.205 K-2 Marker
6600.00 58.516 116.967 4027.39 3971.39 -2273.13 4278.24 5973517.656 390193.314
6700.00 58.516 116.967 4079.61 4023.61 -2311.80 4354.25 5973477.836 390268.717
6800.00 58.516 116.967 4131.84 4075.84 -2350.48 4430.26 5973438.015 390344.119
6807.97 58.516 116.967 4136.00 4080.00 -2353.56 4436.31 5973434.842 390350.128 Base K-2 Sequence
6900.00 58.516 116.967 4184.06 4128.06 -2389.15 4506.26 5973398.195 390419.522
7000.00 58.516 116.967 4236.29 4180.29 -2427.82 4582.27 5973358.374 390494.925
7100.00 58.516 116.967 4288.52 4232.52 -2466.49 4658.28 5973318.554 390570.327
7200.00 58.516 116.967 4340.74 4284.74 -2505.16 4734.28 5973278.733 390645.730
7300.00 58.516 116.967 4392.97 4336.97 -2543.84 4810.29 5973238.913 390721.133
7400.00 58.516 116.967 4445.19 4389.19 -2582.51 4886.29 5973199.092 390796.536
7500.00 58.516 116.967 4497.42 4441 .42 -2621.18 4962.30 5973159.272 390871.938
7600.00 58.516 116.967 4549.64 4493.64 -2659.85 5038.31 5973119.452 390947.341
7700.00 58.516 116.967 4601.87 4545.87 -2698.52 5114.31 5973079.631 391022.744
7800.00 58.516 116.967 4654.10 4598.10 -2737.20 5190.32 5973039.811 391098.146
7900.00 58.516 116.967 4706.32 4650.32 -2775.87 5266.33 5972999.990 391173.549
8000.00 58.516 116.967 4758.55 4702.55 -2814.54 5342.33 5972960.170 391248.952
8100.00 58.516 116.967 4810.77 4754.77 -2853.21 5418.34 5972920.349 391324.354
8200.00 58.516 116.967 4863.00 4807.00 -2891.88 5494.34 5972880.529 391399.757
8300.00 58.516 116.967 4915.22 4859.22 -2930.56 5570.35 5972840.708 391475.160
8400.00 58.516 116.967 4967.45 4911 .45 -2969.23 5646.36 5972800.888 391550.563
8500.00 58.516 116.967 5019.67 4963.67 -3007.90 5722.36 5972761.067 391625.965
8600.00 58.516 116.967 5071.90 5015.90 -3046.57 5798.37 5972721.247 391701.368
8700.00 58.516 116.967 5124.13 5068.13 -3085.24 5874.38 5972681.426 391776.771
8800.00 58.516 116.967 5176.35 5120.35 -3123.92 5950.38 5972641.606 391852.173
8900.00 58.516 116.967 5228.58 5172.58 -3162.59 6026.39 5972601.785 391927.576
9000.00 58.516 116.967 5280.80 5224.80 -3201.26 6102.39 5972561.965 392002.979
ORIGINAL
-. .
HallIburton Sperry-Sun
GeoReport
liiFJfii!F"'l'"'Y"liiLn
Q"'¡"L.ING .el'l~¡m:li.s
~JW__._1j1'lI;n:N.~:''''Q'<\'\
9100.00 58.516 116.967 5333.03 5277.03 -3239.93 6178.40 5972522.144 392078.382
9200.00 58.516 116.967 5385.25 5329.25 -3278.60 6254.41 5972482.324 392153.784
9300.00 58.516 116.967 5437.48 5381 .48 -3317.28 6330.41 5972442.503 392229.187
9400.00 58.516 116.967 5489.71 5433.71 -3355.95 6406.42 5972402.683 392304.590
9500.00 58.516 116.967 5541.93 5485.93 -3394.62 6482.43 5972362.862 392379.992
9600.00 58.516 116.967 5594.16 5538.16 -3433.29 6558.43 5972323.042 392455.395
9700.00 58.516 116.967 5646.38 5590.38 -3471.96 6634.44 5972283.221 392530.798
9800.00 58.516 116.967 5698.61 5642.61 -3510.64 6710.44 5972243.401 392606.201
9900.00 58.516 116.967 5750.83 5694.83 -3549.31 6786.45 5972203.580 392681.603
10000.00 58.516 116.967 5803.06 5747.06 -3587.98 6862.46 5972163.760 392757.006
10100.00 58.516 116.967 5855.29 5799.29 -3626.65 6938.46 5972123.939 392832.409
10193.28 58.516 116.967 5904.00 5848.00 -3662.72 7009.36 5972086.796 392902.742 Albian 97
10200.00 58.516 116.967 5907.51 5851.51 -3665.32 7014.47 5972084.119 392907.811
10300.00 58.516 116.967 5959.74 5903.74 -3704.00 7090.48 5972044.298 392983.214
10400.00 58.516 116.967 6011.96 5955.96 -3742.67 7166.48 5972004.478 393058.617
10500.00 58.516 116.967 6064.19 6008.19 -3781.34 7242.49 5971964.657 393134.019
10600.00 58.516 116.967 6116.41 6060.41 -3820.01 7318.50 5971924.837 393209.422
10693.03 58.516 116.967 6165.00 6109.00 -3855.99 7389.20 5971887.791 393279.570 Albian 96
10700.00 58.516 116.967 6168.64 6112.64 -3858.68 7394.50 5971885.016 393284.825
10800.00 58.516 116.967 6220.87 6164.87 -3897.36 7470.51 5971845.196 393360.228
10900.00 58.516 116.967 6273.09 6217.09 -3936.03 7546.51 5971805.375 393435.630
11000.00 58.516 116.967 6325.32 6269.32 -3974.70 7622.52 5971765.555 393511.033
11100.00 58.516 116.967 6377.54 6321.54 -4013.37 7698.53 5971725.734 393586.436
11200.00 58.516 116.967 6429.77 6373.77 -4052.04 7774.53 5971685.914 393661.838
11227.25 58.516 116.967 6444.00 6388.00 -4062.58 7795.25 5971675.062 393682.387 Top HRZ
11300.00 58.516 116.967 6481.99 6425.99 -4090.72 7850.54 5971646.093 393737.241
11400.00 58.516 116.967 6534.22 6478.22 -4129.39 7926.55 5971606.273 393812.644
11500.00 58.516 116.967 6586.44 6530.44 -4168.06 8002.55 5971566.452 393888.047
11552.76 58.516 116.967 6614.00 6558.00 -4188.46 8042.65 5971545.442 393927.830 Base HRZ
11600.00 58.516 116.967 6638.67 6582.67 -4206.73 8078.56 5971526.632 393963.449
11654.24 58.516 116.967 6667.00 6611.00 -4227.71 8119.79 5971505.031 394004.351 K-1 Marker
11667.71 58.516 116.967 6674.03 6618.03 -4232.92 8130.02 5971499.671 394014.501
11700.00 59.491 118.469 6690.66 6634.66 -4245.79 8154.52 5971486.424 394038.804
11742.87 60.811 120.416 6712.00 6656.00 -4264.07 8186.90 5971467.656 394070.896 Top Kuparuk
11800.00 62.613 122.934 6739.08 6683.08 -4290.49 8229.70 5971440.591 394113.287
11837.56 63.821 124.544 6756.00 6700.00 -4309.11 8257.58 5971421.548 394140.875 Kuparuk C
11846.67 64.117 124.929 6760.00 6704.00 -4313.78 8264.31 5971416.780 394147.533 LCU
11900.00 65.868 127.148 6782.55 6726.55 -4342.22 8303.38 5971387.756 394186.164
12000.00 69.234 131.150 6820.74 6764.74 -4400.57 8375.00 5971328.321 394256.882
12100.00 72.688 134.975 6853.37 6797.37 -4465.12 8444.02 5971262.740 394324.902
12144.40 74.245 136.626 6866.00 6810.00 -4495.63 8473.68 5971231.784 394354.099 Miluveach A
12200.00 76.212 138.658 6880.18 6824.18 -4535.36 8509.90 5971191.511 394389.707
12229.75 77.271 139.731 6887.00 6831.00 -4557.27 8528.82 5971169.312 394408.290 Alpine D
12300.00 79.789 142.230 6900.97 6844.97 -4610.76 8572.16 5971115.176 394450.802
12329.93 80.868 143.282 6906.00 6850.00 -4634.25 8590.01 5971091.418 394468.300 Alpine C
12400.00 83.404 145.722 6915.59 6859.59 -4690.75 8630.31 5971034.317 394507.724
12457.00 85.476 147.688 6921.11 6865.11 -4738.17 8661 .44 5970986.437 394538.135 7" Csg Pt @ 12457' MD
12500.00 87.043 149.164 6923.91 6867.91 -4774.72 8683.91 5970949.548 394560.039
12577.08 89.856 151.800 6926.00 6870.00 -4841.76 8721.87 5970881.944 394596.968 CD1-08 (Heel)
12600.00 89.856 151.800 6926.06 6870.06 -4861.96 8732.70 5970861.585 394607.488
12700.00 89.856 151.800 6926.31 6870.31 -4950.09 8779.95 5970772.754 394653.394
12800.00 89.856 151.800 6926.56 6870.56 -5038.22 8827.21 5970683.923 394699.299
12900.00 89.856 151.800 6926.81 6870.81 -5126.35 8874.46 5970595.092 394745.204
ORIGINAL
~alliburton sperry-su!'
GeoReport
sp&!l""'l""y..s~
U!t.;,I"IN.Ii5.e.a\lU::U
_~ n,,*.uI:l!~t;<S ~~'"'i'-
13000.00 89.856 151.800 6927.06 6871.06 -5214.48 8921.72 5970506.262 394791.109
13100.00 89.856 151.800 6927.31 6871.31 -5302.61 8968.97 5970417.431 394837.015
13200.00 89.856 151.800 6927.56 6871 .56 -5390.74 9016.23 5970328.600 394882.920
13300.00 89.856 151.800 6927.81 6871.81 -5478.87 9063.48 5970239.769 394928.825
13400.00 89.856 151.800 6928.07 6872.07 -5567.00 9110.74 5970150.938 394974.730
13500.00 89.856 151.800 6928.32 6872.32 -5655.13 9157.99 5970062.107 395020.635
13600.00 89.856 151.800 6928.57 6872.57 -5743.26 9205.25 5969973.276 395066.541
13700.00 89.856 151.800 6928.82 6872.82 -5831.39 9252.51 5969884.445 395112.446
13800.00 89.856 151.800 6929.07 6873.07 -5919.52 9299.76 5969795.614 395158.351
13900.00 89.856 151.800 6929.32 6873.32 -6007.65 9347.02 5969706.783 395204.256
14000.00 89.856 151.800 6929.57 6873.57 -6095.78 9394.27 5969617.952 395250.161
14100.00 89.856 151.800 6929.82 6873.82 -6183.91 9441.53 5969529.121 395296.067
14200.00 89.856 151.800 6930.07 6874.07 -6272.04 9488.78 5969440.290 395341.972
14300.00 89.856 151.800 6930.32 6874.32 -6360.17 9536.04 5969351.459 395387.877
14400.00 89.856 151.800 6930.58 6874.58 -6448.30 9583.29 5969262.628 395433.782
14500.00 89.856 151.800 6930.83 6874.83 -6536.43 9630.55 5969173.797 395479.688
14600.00 89.856 151.800 6931.08 6875.08 -6624.56 9677.80 5969084.966 395525.593
14700.00 89.856 151.800 6931.33 6875.33 -6712.69 9725.06 5968996.135 395571.498
14800.00 89.856 151.800 6931.58 6875.58 -6800.82 9772.31 5968907.304 395617.403
14900.00 89.856 151.800 6931.83 6875.83 -6888.95 9819.57 5968818.473 395663.308
15000.00 89.856 151.800 6932.08 6876.08 -6977 .08 9866.83 5968729.642 395709.214
15100.00 89.856 151.800 6932.33 6876.33 -7065.21 9914.08 5968640.811 395755.119
15200.00 89.856 151.800 6932.58 6876.58 -7153.34 9961.34 5968551.980 395801.024
15300.00 89.856 151.800 6932.84 6876.84 -7241.47 10008.59 5968463.149 395846.929
15400.00 89.856 151.800 6933.09 6877.09 -7329.60 10055.85 5968374.318 395892.834
15500.00 89.856 151.800 6933.34 6877.34 -7417.72 10103.10 5968285.487 395938.740
15600.00 89.856 151.800 6933.59 6877.59 -7505.85 10150.36 5968196.656 395984.645
15700.00 89.856 151.800 6933.84 6877.84 -7593.98 10197.61 5968107.825 396030.550
15764.04 89.856 151.800 6934.00 6878.00 -7650.43 10227.88 5968050.934 396059.950 CD1-08 (Toe)
15800.00 89.856 151.800 6934.09 6878.09 -7682.11 10244.87 5968018.994 396076.455
15900.00 89.856 151.800 6934.34 6878.34 -7770.24 10292.12 5967930.163 396122.361
16000.00 89.856 151.800 6934.59 6878.59 -7858.37 10339.38 5967841.332 396168.266
16100.00 89.856 151.800 6934.84 6878.84 -7946.50 10386.63 5967752.501 396214.171
16200.00 89.856 151.800 6935.09 6879.09 -8034.63 10433.89 5967663.670 396260.076
16300.00 89.856 151.800 6935.35 6879.35 -8122.76 10481.15 5967574.839 396305.981
16400.00 89.856 151.800 6935.60 6879.60 -8210.89 10528.40 5967486.008 396351.887
16500.00 89.856 151.800 6935.85 6879.85 -8299.02 10575.66 5967397.177 396397.792
16600.00 89.856 151.800 6936.10 6880.10 -8387.15 10622.91 5967308.346 396443.697
16700.00 89.856 151.800 6936.35 6880.35 -8475.28 10670.17 5967219.515 396489.602
16800.00 89.856 151.800 6936.60 6880.60 -8563.41 10717.42 5967130.684 396535.507
16900.00 89.856 151.800 6936.85 6880.85 -8651.54 10764.68 5967041 .853 396581.413
17000.00 89.856 151.800 6937.10 6881.10 -8739.67 10811.93 5966953.022 396627.318
17100.00 89.856 151.800 6937.35 6881.35 -8827.80 10859.19 5966864.191 396673.223
17200.00 89.856 151.800 6937.60 6881.60 -8915.93 10906.44 5966775.360 396719.128
17264.00 89.856 151.800 6937.77 6881.77 -8972.34 10936.69 5966718.508 396748.508 6 1/8" Open Hole
17264.04 89.856 151.800 6937.77 6881 .77 -8972.37 10936.71 5966718.470 396748.528 TD=3973'FNL & 2408'FEL; e
Wellpath: CD1-08 Drilled From: Well Ref. Point
Tie-on Depth: 36.50 ft
Current Datum: CD1 (Planning RKB) @ 56' Height 56.00 ft Above System Datum: Mean Sea Level
Magnetic Data: 8/30/2002 Declination: 24.80 deg
Field Strength: 57432 nT Mag Dip Angle: 80.61 deg
Vertical Section: Depth From (TVD) +N/-S +EI-W Direction
ORIGINAL
~aIliburton sperry-sun·
GeoReport
Bpe!I'""I""Y"'sun
~1"J,'¡JÆ~'\l1 c;u
.;. ~un'.'~ ò')<II!>W~"....-
+N/-S
ft
0.00
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
Well Ref. Point
36.50 ft
Mean Sea Level
24.80 deg
80.61 deg
Direction
deg
129.421
WeUpath: CD1-08
Current Datum:
Magnetic Data:
Field Strength:
Vertical Section:
CD1 (Planning RKB) @ 56'
8/30/2002
57432 nT
Depth From (TVD)
ft
36.50
Height 56.00 ft
Targets
CD1-08 (Heel) 6926.00 -4841.76 8721.87 5970881.944394596.968 70 19 46.759 N 150 51 17.655 W
CD1-08 (Toe) 6934.00 -7650.43 10227.88 5968050.934396059.950 70 19 19.118 N 150 50 33.798 W
Annotation
36.50
12577.08
15764.04
17264.04
36.50
6926.00
6934.00
6937.77
SL= 272'FNL & 2757'FEL; Sec5-T11 N-R5E
Target Heel= 5119'FNL & 4610'FEL; Sec3-T11 N-R5E
Target Toe: 2650'FNL & 3113'FEL; Sec10-T11N-R5E
TD=3973'FNL & 2408'FEL; Sec10-T11 N-R5E
ORIGINAL
conocoPhillips Alaska, In'
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
.
Conoc~illips
April 7, 2004
Alaska Oil and Gas Conservation Commission
333 West ¡th Avenue, Suite 100
Anchorage, Alaska 99501
Re: Application for Permit to Drill
CD1-08
Dear Sir or Madam:
Phillips Alaska, Inc. hereby applies for a Permit to Drill an onshore production well from the
Alpine CD1 drilling pad. The intended spud date for this well is April 24, 2004. It is intended
that Doyon Rig 19 drill the well.
The intermediate portion of CD1-08 will then be drilled and landed in the Alpine sand'
horizontally; 7" casing will then be run and cemented in place. CD1-08 will be completed as an
open hole producer. At the end of the work program the well will be shut in awaiting surface
connection.
/
Note that it is planned to drill the surface hole without a diverter. There have been 39 wells
drilled on CD1 pad and 43 wells drilled on C02 pad with no significant indication of gas or
shallow gas hydrates. While drilling two surface hole sections (CD1-07 and CD1-46) drilled this
"
year, mud logging services were used and there were no significant indications of gas. One j
section on well CD1-07 showed up to 754 units of gas in the depth interval from 1390 to 1420 v"
ft md. There were no measured gains in mud pit volumes associated with the gas.
It is also requested that the packer placement requirement be relaxed to place the packer 200ft
TVD above the Alpine formation. This will place the completion at a maximum inclination less
than 65 degrees, and allow access to the completion with standard wireline tools for future
intervention. ~ Þ\. \ c:. ~ ? ~o ð~ c'- ì. e:, '" ~:¿\ \ ~
Please find attached the information required by 20 ACC 25.005 (a) and (c) for your
review. Pertinent information attached to this application includes the following:
1. Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a).
2. Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1).
3. A proposed drilling program
4. A drilling fluids program summary.
5. Proposed completion diagram.
6. Pressure information as required by 20 ACC 25.035 (d)(2).
7. Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b).
Information pertinent to this application that is presently on file at the AOGCC is:
1. Diagrams of the BOP equipment, diverter equipment and choke man~~9IJ1.I~sl~ed
by 20 ACC 25.035 (a) and (b). t(t:\Jt: V t:U
2. A description of the drilling fluids handling system.
3. Diagram of riser setup which replaces diverter APR - 82004
Alaska Oil & Gas Cons. Commission
Anchorage
ORiGiNAL
.
.
If you have any questions or require further information, please contact Zane Kuenzler
at 265-6081 or Chip Alvord at 265-6120.
Sincerely,
~-- 7~
Vern Johnson
Drilling Engineer
Attachments
'ý'/JÞ y
cc:
CD1-08 Well File / Sharon Allsup Drake
Chip Alvord
Vern Johnson
Cliff Crabtree
Steve Moothart/Jeff Yeaton
Nancy Lambert
Lanston Chin
e-mail:
ATO 1530
ATO 1700
ATO 1702
ATO 1768
A TO 1756/1752
Anadarko - Houston
Kuukpik Corporation
Tommv Thompson@anadarko.com
OR\G\NAL
RECEIVED
APR - 82004
Alaska Oil & Gas Cons. Commission
Anchorage
.
.
2 7 b III ~ 0 ... 7
RECEIVED
APR - 8 2004
AJaaka Oil & Gas Cons. Commission
Anchorage
.
.
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME {:R t{' (! Ì) /- 68;
PTD# . 20 V-û5cl
V Development
Service
Exploration
Stratigraphic
CHECK WßA T ADD-ONS "CLUE"
APPLIES (OPTIONS)
MULTI Tbe permit is for a new wellbore segment of
LATERAL existing well ,
Permit No, API No. .
(If API number Production. should continue to be reported as
last two (2) digits a function 'of tbe original API number. stated
are between 60-69) above.
PILOT HOLE In accordance witb 20 AAC 25.005(1), aU
(PH) records, data and logs acquired for tbe pilot
bole must be clearly differentiated In botb
name (name on permit plus PH)
.' and API Dumber (50 -
70/80) from records, data and logs acquired
for well (name on permit).
SPACING Tbe permit is approved subject ·to fuD
EXCEPTION compliance witb 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing e:J ception.
(Companv Name) assumes tbe liøbUity of any
protest to tbe spacing .exception tbat may
occur.
DRY DITCH AIJ dry ditcb sample sets submitted to tbe
SAMPLE Commission must be in no greater tban 30'
sample intervals from be)ow tbe permafrost
or from where samp)es are first caugbt and
10' samp)e inter:va)s tbrough target zones.
Geologic
Commissioner:
pr;
Appr
SFD
Date
4/12/2004
35
36
37
38
39
Engineering
Commissioner:
Date
Public
Commissioner
Date
_Seabed _col1djtipo survey _(if
CQnta_ct
l1amelphonefor
weelsly prpgre&sreports [exploratp(y _onlyt
Yes
Yes
NA
NA
NA
Off-Shp(e)
Drijng HalaJds SummaJ)/
s_aw _elevated gas Jrpm
1390_-1420' _MQ; mitig<ltjonstrategyshown io
Seismic_analysis Qf sbaJlow gaszpoes_
Expected
Offset weILCQ1-0], drilled
reservoir pre_ssure is_8,7_ppg EMW.
this year,_
Permit
_D_ata_PJeseoted on pote_ntial pveJpres_sure .zOl1es
cao be issued wlo hydrogen sulfide meaS~(es
Geology
32
33
34
Js presence. Qf H2S gas_ prob_able
Meçba_nicaLcolJdjtion pf
wells withil1 AOB verified (for
s_ervjq¡ welJ only)
/f)/f'V/l Lt( (3
Appr Date
.EM 4/13/2004
22
23
24
25
26
27
28
29
30
31
_test to (puJ
Choke manifold cQmpJies w/APIRF'-53 (May 84)
WQrk will occ_ur withputoper<ltjon .shutdown
BOPEs,.dp
_BOPEpress
ratiog appropriate;
Jhey meet regulatiol1
_DJilIiog
fluid program schem<ltic.& ectuip
istadequ<lte
J(a.re-drilL has_a_ 10,403 fQr abandonment
Adequate well bore separ<ltio.n _proposed
I(diverter JequiJed, dQes it
meet reguJatiolJs_
beeo <lPPJQved
AdequateJan.kage_oJ re_serve pit
tie-in
_CMTwill çoyer_aJl klJown-PfQductiye hQrizons
_C_asiog de.sigo& adequa_te fpr
C,T, B_&_permakost
18
19
20
21
_CMT vol adeQ uate_ to
IQng _string to surf csg.
known USDW&
_CMT v_ol adeQu_ateJo circulate_o_n _cooductor_
& surf csg
Yes
NA
.Yes
No_
No
Yes
Yes
_NA
Yes
NA
Yes
Yes
Yes
Yes
Yes
No
_NA
Bectue&t made regardiog setting p<lcker
'higher'
_NA fPr production welJs_
-
Alpioe. . Rig is _equipped witb sensors <llJd_ alarms.
1:12S basnpt beelJ reported .at
psig incommeots)
MASP calcuJate.d.at 2445 psi, 35QO_psl apprppriate, CPAt
u.sually te_sts.tQ 5QOO psi..
Diyerter waiveJ re.quested, Mostre~otweJls
Maximum expected fprmation pressuœ.8]EMW..
mud Ipgged,s.ome~<I& se.en jnCD1,Q7, drilling actio os identified
MW ilJ
planned up tp .9,8.
intermediate boJe_ and _8._8.ilJ Alpine sa
mitigation possible,
I?rp~imity analysis perf.orme.d, Jrayeling cylioder patb calculate.d, ßyros Or QtbeJ
NQ reseJ\lepitplanoed,
WasteJo apprQved annul~s or.disposa! well,
Big isequippe.dwith steeLpjts.
Aonular disposal ultimately plaoned.
op_en hole
completiolJ pl<loned.
~o aquifers, per
AIO 18A çonc!usiolJ 3.
Engineering
Appr
D
Date
4/12/2004
2
13
14
15
16
7
Coodu.ctor
_S.urface .ca&il1gpJQtects all
AJI welJs.within.1l4.mile.area.of review jdeotified (Fpr &eNi~well ol1ly)
Pre-produced iojector; duratio_n.of pre-productiplJ less than. 3 montbs (For service well QnJy)
ACMP.FJndjngof CQn.sisteocy_has beenjssued_ foUhis prolect_
stringpJQvided
Lease.number
.U.nique wellname.and oumb.er
15-day wait
IQc<lted withil1 area andstrat<l.authorized by.
lojectiolJ Order # (put
10#
in. comm_eots). (For
Administration
2
3
4
5
6
7
8
9
10
11
J(deviated ilJcJu.ded
.Operator Ol1ly affected party. . . . _
.Operator has.apprppriate. bond inJorce
Permit cao be issued witbQut co.nservatiOI1 order
Permit cao be issued witbQut
Can permit
Well
is weJlbQre plat
Well JQc<lted ina d_efil1ed pool
WeJUQc<lted proper _distance. from driJlin9 ul1itb_ouod_a(y.
WelUQc<lted prpper .distance from Qtber wells
_S_ufficiel1t acreageaYailable in_ dJilIilJg unit
Field & Pool
appropriate.
COLVILLE RIVER, ALPINE OIL - 120100
be approved before
admilJistrati\le_ apprpvaJ
NC
Initial ClassfType
Yes
No.
.Yes
Yes
Yes
Yes
Yes
Yes
Yes
.Y.es
Yes
Yes
Yes
_NA
_NA
NA
NA
Alpioe OiJ PooL CQnservatioo Ord.er ~Q. M3
DE~
Surface Location is io ADL 025559 and top prod. intand JDare ilJ ADL 3Z2D59.
Well Name: COLVILLE RiV UNIT CD1-08
~END GeoArea ~90
Unit
50360
Program DEV
On/Off Shore
On
Well
Annular
Disposal
bore seg
D
D
e
e
W II History File
AP
ENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information. information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Sperry-Sun Drtlting Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Mon May 24 09:37:02 2004
Reel Header
Service name. . . . . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/05/24
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library.
e
.
:l,tJ t./ .... ð ()'T
125~5
RECEIVED
JUN 0 9 2004
Alaska Oil & Gas ConS,lY--",¡".-.
Ancbofage -''''1JIIIIMIr
Scientific Technical Services
Tape Header
Service name..... . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/05/24
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... .UNKNOWN
Continuation Number.. ... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Colville River Unit (Alpine)
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
CD1-08
501032048900
ConocoPhillips Alaska, Inc.
Sperry Sun
24-MAY-04
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 2
MW0003041097
M. HANIK
D. LUTRICK
MWD RUN 3
MW0003041097
M. HANIK
D. LUTRICK
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
5
11
5 E
272
2523
.00
55.60
19.50
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE
BIT SIZE (IN)
8.500
6.125
DRILLERS
DEPTH (FT)
3408.0
12515.0
CASING
SIZE (IN)
9.625
7.000
#
MWD RUN 4
MW0003041097
R. KRELL
D. MICKEY
REMARKS:
e
e
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUN 1 WAS DIRECTIONAL ONLY AND IS NOT PRESENTED.
4. MWD RUN 2 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING
GEIGER-MUELLER TUBE DETECTORS¡ ELECTROMAGNETIC WAVE
RESISTIVITY
PHASE-4 (EWR4) ¡ PRESSURE WHILE DRILLING (PWD) ¡ AND
GEO-PILOT ROTARY
STEERABLE BHA (GP). WINDOW/HOLE PROBLEMS PREVENTED
PROGRESS - THE
MWD BHA WAS REMOVED AND A CLEANOUT RUN WAS MADE,
WITH 20' OF NEW HOLE
MADE. ONLY SROP DATA ARE PRESENTED FOR RUN 2.
5. MWD RUN 3 COMPRISED DIRECTIONAL WITH DGR¡ EWR4¡ PWD¡
AND GP.
6. MWD RUN 4 COMPRISED DIRECTIONAL WITH DGR¡ EWR4¡ PWD¡
AND AT-BIT
INCLINATION (ABI).
7. MWD DATA ARE CONSIDERED PDC PER DISCUSSION OF ALPINE
LOGGING
REQUIREMENTS AT PHILLIPS/VENDOR MEETING HELD ON 26
SEPTEMBER 2001.
8. MWD RUNS 2 - 4 REPRESENT WELL CDI-08 WITH API#:
50-103-20489-00.
THIS WELL REACHED A TOTAL DEPTH (TD) OF
15837'MD/6935'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name........... ..STSLIB.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/05/24
Maximum Physical Record. .65535
File Type.... ........... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves¡ all bit runs merged.
DEPTH INCREMENT: .5000
#
FILE SUMMARY
PBU TOOL CODE
FET
RPD
RPM
RPS
RPX
GR
ROP
$
e
START DEPTH
3396.5
3396.5
3396.5
3396.5
3396.5
3404.5
3418.5
STOP DEPTH
15777 . 5
15777.5
15777.5
15777.5
15777.5
15770.5
15837.0
e
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
#
REMARKS:
BIT RUN NO
2
3
4
MERGED MAIN PASS.
$
MERGE TOP
3418.5
3438.0
12525.0
MERGE BASE
3438.0
12525.0
15837.0
#
Data Format Specification Record
Data Record Type................ ..0
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............ ..Undefined
Frame Spacing................... ..60 .1IN
Max frames per record............ . Undefined
Absent value........... .......... .-999
Depth units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
Service Unit
FT
FT/H
API
OHMM
OHMM
OHMM
OHMM
HOUR
MWD
MWD
MWD
MWD
MWD
MWD
MWD
Min
3396.5
0.24
29.26
0.56
0.07
0.18
0.15
0.18
Max
15837
1003.61
422.38
1781. 48
2000
2000
2000
78.59
Mean
9616.75
165.098
99.2556
11.3638
11.6649
21.2431
24.9931
0.968297
First Reading For Entire File......... .3396.5
Last Reading For Entire File......... ..15837
Nsam
24882
24838
24733
24763
24763
24763
24763
24763
First
Reading
3396.5
3418.5
3404.5
3396.5
3396.5
3396.5
3396.5
3396.5
Last
Reading
15837
15837
15770.5
15777.5
15777.5
15777.5
15777.5
15777 . 5
e
File Trailer
Service name............ .STSLIB.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/05/24
Maximum Physical Record. .65535
File Type.... ........... .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number........ ...1.0.0
Date of Generation.... ...04/05/24
Maximum Physical Record..65535
File Type............... .LO
Previous File Name.... ...STSLIB.OOl
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
ROP
$
2
e
header data for each bit run in separate files.
2
.5000
START DEPTH
3418.5
STOP DEPTH
3438.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
02-MAY-04
Insite
66.37
Memory
3438.0
3418.0
3438.0
.0
.0
TOOL NUMBER
124725
8.500
3408.0
SPUD
9.70
75.0
9.0
1400
7.6
.000
.000
.0
109.4
MUD FILTRATE AT MTtIÞ
MUD CAKE AT MT:
.000
.000
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.............. ....0
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value......... ............ .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type. ..0
Name Service Order
DEPT
ROP MWD020
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
Name Service Unit
DEPT FT
ROP MWD020 FT/H
Min
3418.5
3.29
Max
3438
85.82
Mean
3428.25
22.902
Nsam
40
40
First Reading For Entire File......... .3418.5
Last Reading For Entire File.......... .3438
File Trailer
Service name........ .....STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/05/24
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/05/24
Maximum Physical Record. .65535
File Type........... .... .LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
.0
.0
First
Reading
3418.5
3418.5
Last
Reading
3438
3438
header da_for
3
.5000
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FET
RPD
RPM
RPX
RPS
GR
ROP
$
START DEPTH
3396.5
3396.5
3396.5
3396.5
3396.5
3404.5
3438.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
each bit run in separate ftltS.
STOP DEPTH
12482.5
12482.5
12482.5
12482.5
12482.5
12490.0
12525.0
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RES IS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....o
Logging Direction............... ..Down
Optical log depth units....... ....Feet
06-MAY-04
Insite
66.37
Memory
12525.0
3438.0
12525.0
54.6
83.6
TOOL NUMBER
124725
151812
8.500
3408.0
LSND
9.65
45.0
9.0
980
5.0
1. 990
.900
2.600
2.990
65.0
152.6
65.0
65.0
Data Reference Point... .4IÞ...... . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record. ........... .Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
e
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 3396.5 12525 7960.75 18258 3396.5 12525
ROP MWD030 FT/H 3.39 462.63 189.446 18174 3438.5 12525
GR MWD030 API 42.04 422.38 114.193 18172 3404.5 12490
RPX MWD030 OHMM 0.56 1781. 48 5.75999 18173 3396.5 12482.5
RPS MWD030 OHMM 0.07 2000 6.10567 18173 3396.5 12482.5
RPM MWD030 OHMM 0.18 2000 6.55044 18173 3396.5 12482.5
RPD MWD030 OHMM 0.15 2000 8.61714 18173 3396.5 12482.5
FET MWD030 HOUR 0.18 78.59 0.589247 18173 3396.5 12482.5
First Reading For Entire File......... .3396.5
Last Reading For Entire File.......... .12525
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number....... ... .1.0.0
Date of Generation...... .04/05/24
Maximum Physical Record. .65535
File Type.. .... ......... .LO
Next File Name.. ........ .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number....... ... .1.0.0
Date of Generation...... .04/05/24
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FET
4
header data for each bit run in separate files.
4
.5000
START DEPTH
12466.5
STOP DEPTH
15777.5
RPD
RPM
RPS
RPX
GR
ROP
$
12483._
12483.0
12483.0
12483.0
12490.5
12525.5
15777.5
15777.5
15777.5
15777.5
15770.5
15837.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record... ........ ..Undefined
Absent value.................... ..-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
e
ll-MAY-04
Insite
66.37
Memory
15837.0
12525.0
15837.0
85.1
93.0
TOOL NUMBER
160796
148574
6.125
12515.0
MOBM
8.80
63.0
.0
44000
4.4
.000
.000
.000
.000
.0
164.0
.0
.0
,.
Name Service Order Units sta Nsam Rep Code Offset Channel e
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 12466.5 15837 14151.8 6742 12466.5 15837
ROP MWD040 FT/H 0.24 1003.61 99.1536 6624 12525.5 15837
GR MWD040 API 29.26 147.39 57.8826 6561 12490.5 15770.5
RPX MWD040 OHMM 2.36 1180.52 26.8173 6590 12483 15777.5
RPS MWD040 OHMM 2.53 1724.61 26.9954 6590 12483 15777.5
RPM MWD040 OHMM 0.22 2000 61.7606 6590 12483 15777.5
RPD MWD040 OHMM 0.73 2000 70.1526 6590 12483 15777.5
FET MWD040 HOUR 0.45 78.32 2.36778 6623 12466.5 15777.5
First Reading For Entire File......... .12466.5
Last Reading For Entire File....... ... .15837
File Trailer
Service name......... ....STSLIB.004
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .04/05/24
Maximum Physical Record. .65535
File Type.... ........... .LO
Next File Name.......... .STSLIB.005
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/05/24
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number.... ..01
Next Tape Name....... .., . UNKNOWN
Comments. ............... .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/05/24
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name.............. ..UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
e
e
End Of LIS File