Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-250CAUTION: This email originated from outside the State of Alaska mail system.
Do not click links or open attachments unless you recognize the sender and know
the content is safe.
From:Wallace, Chris D (OGC)
To:AOGCC Records (CED sponsored)
Subject:FW: WNS injector CD2-08 (PTD #202-250) report of high IAP.
Date:Tuesday, October 11, 2022 9:21:12 AM
Attachments:image001.png
AnnComm Surveillance TIO for CD2-08.pdf
From: Well Integrity Specialist CPF2 <n2549@conocophillips.com>
Sent: Monday, October 10, 2022 2:30 PM
To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>
Cc: Earhart, Will C <William.C.Earhart@conocophillips.com>; Well Integrity Specialist CPF2
<n2549@conocophillips.com>
Subject: WNS injector CD2-08 (PTD #202-250) report of high IAP.
Chris-
WNS injector CD2-08 (PTD #202-250) was reported to have 2200 psi on the IA. The well has 7” 26
lb/ft L-80 which has an internal yield pressure of 7240 psi. The well was secured in 2014 due to two
tubing leaks and has remained secured since. DHD will conduct a tubing and IA draw down test and
depending on the results, additional diagnostics will be conducted to determine the cause of the IA
pressure increase. At this point in time, CPAI does not intend to return the well to injection and any
diagnostics conducted will be in order to ensure the well remains secured from the reservoir while
shut in. Please let me know if you have any questions or disagree with the plan. Attached is a well
bore schematic and 90 day TIO plot.
Dusty Freeborn
Well Integrity Specialist
ConocoPhillips Alaska, Inc.
Office phone: (907) 659-7224
Cell phone: (907) 830-9777
Last Tag Annotation Depth (ftKB) Wellbore End Date Last Mod ByLast Tag: SLM, Tools Deviated Out 11,503.0 CD2-08 5/29/2014 oberrLast Rev Reason Annotation Wellbore End Date Last Mod ByRev Reason: Set PXN w/ Dual gauges, Update Schematic CD2-08 8/29/2022 oberrNotes: General & Safety Annotation End Date Last Mod ByNOTE: LDL FOUND LEAKS @ 960' AND 902' 6/5/2014 hipshkfNOTE: VIEW SCHEMATIC w/Alaska Schematic9.0 8/25/2010 haggeaNOTE: TREE: FMC 4 1/16 5K - TREE CAP CONNECTION: 7" OTIS 2/8/2003 WV5.3 ConversionCasing StringsCasing DescriptionCONDUCTOR OD (in)16 ID (in)14.69 Top (ftKB)37.0 Set Depth (ft…114.0 Set Depth …114.0 Wt/Len (lb/ft)109.00 GradeH-40 Top ConnectionWELDED
Casing Description
SURFACE
OD (in)
9 5/8
ID (in)
8.92
Top (ftKB)
36.6
Set Depth (ft…
2,889.2
Set Depth …
2,393.2
Wt/Len (lb/ft)
36.00
Grade
J-55
Top Connection
BTC
Casing Description
PRODUCTION
OD (in)
7
ID (in)
6.28
Top (ftKB)
34.4
Set Depth (ft…
12,241.5
Set Depth …
7,094.3
Wt/Len (lb/ft)
26.00
Grade
L-80
Top Connection
BTCM
Casing Description
OPEN HOLE
OD (in)
6 1/8
ID (in) Top (ftKB)
12,241.5
Set Depth (ft…
18,050.0
Set Depth …
7,071.4
Wt/Len (lb/ft) Grade Top Connection
Liner Details: excludes liner, pup, joints, casing, sub , shoe , float...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des Com Make Model
Nominal ID
(in)
12,241.5 7,094.3 87.22 OPEN HOLE
Tubing Strings: string max indicates LONGEST segment of string
Top (ftKB)
32.8
Set Depth …
6,828.0
String Ma…
4 1/2
Tubing Description
TUBING
Set Depth (ftKB)
11,026.6
Wt (lb/ft)
12.60
Grade
L-80
Top Connection
IBTM
ID (in)
3.96
Completion Details: excludes tubing, pup, space out, thread, RKB...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal
ID (in)
32.8 32.8 0.00 HANGER 10.800 FMC TUBING HANGER 4.500
2,235.1 2,000.8 50.62 NIPPLE 5.620 CAMCO DB NIPPLE CAMCO DB 3.812
10,793.9 6,723.8 61.47 GAS LIFT 5.984 CAMCO KBG-2 CAMCO KBG-2 3.938
10,907.1 6,776.4 63.29 PACKER 5.970 BAKER S-3 PACKER w/MILLOUT
EXTENSION
BAKER S-3 3.875
11,014.2 6,822.8 65.21 NIPPLE 5.000 HES XN NIPPLE NO GO HES XN 3.725
11,025.2 6,827.4 65.38 WLEG 5.000 BAKER WIRELINE GUIDE 3.875
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (ftKB)
Top (TVD)
(ftKB) Top Incl (°) Des Com Make Model SN ID (in)
902.0 897.4 10.58 LEAK - TUBING LDL Identified leak in tubing 0.000
960.0 954.2 13.41 LEAK - TUBING LDL Identified leak in tubing 0.000
11,014.2 6,822.8 65.21 TUBING PLUG 3.812" PXN Plug w/ Dual Spartek
Gauges, 4.5" Bait Sub on prong
(60" OAL)
80934
&
80464
0.000
Mandrel Inserts : excludes pulled inserts
Top (ftKB)
Top (TVD)
(ftKB)
Top
Incl (°)
St
ati
on
No
/S Serv
Valve
Type
Latch
Type
OD
(in)
TRO Run
(psi) Run Date Com Make Model
Port
Size (in)
10,793.9 6,723.8 61.47 1 GAS LIFT DMY BK 1 0.0 3/24/2003 0.000
CD2-08, 8/29/2022 8:23:32 PMVertical schematic (actual)
OPEN HOLE; 12,241.5-18,050.0
OPEN HOLE; 12,241.5-18,050.0
PRODUCTION; 34.4-12,241.5
FLOAT SHOE; 12,240.1-
12,241.5
FLOAT COLLAR; 12,155.4-
12,156.7
WLEG; 11,025.2
TUBING PLUG; 11,014.2
NIPPLE; 11,014.2
PACKER; 10,907.1
GAS LIFT; 10,793.9
SURFACE; 36.6-2,889.2
FLOAT SHOE; 2,887.4-2,889.2
FLOAT COLLAR; 2,802.0-
2,803.5
NIPPLE; 2,235.1
LEAK - TUBING; 960.0
LEAK - TUBING; 902.0
CONDUCTOR; 37.0-114.0
HANGER; 36.6-39.7HANGER; 34.4-36.0HANGER; 32.8 WNS INJ KB-Grd (ft)43.71 RR Date2/9/2003 Other Elev…CD2-08...TDAct Btm (ftKB)18,050.0Well AttributesField NameALPINE Wellbore API/UWI501032044200 Wellbore StatusINJ Max Angle & MDIncl (°)92.83 MD (ftKB)16,625.30WELLNAME WELLBORECD2-08AnnotationLast WO:End DateH2S (ppm) DateCommentSSSV: WRDP
U
MEMORANDUM
To: Jim Regg ~c'~~ ~7I6 I ~o
P.I. Supervisor
FROM: Jeff Jones
Petroleum Inspector
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday, August 02, 2010
SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA INC
CD2-08
COLVILLE RIV UNIT CD2-08
Src: Inspector
NON-CONFIDENTIAL
Reviewed By:
r.
P.I. Suprv
Comm
Well Name: COLVILLE RIV UNIT CD2-08 API Well Number: 50-103-20442-00-00
Insp Num: mitJJ100802073653 Permit Number: 202-250-0
Rel Insp Num: Inspector Name: Jeff Jones
Inspection Date: 6/12/2010
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well cnz-os . Type Inj. , w TVD 6776 IA sso zsoo '~ 2460 2460 '
P.T.Di zoz2soo TypeTest sPT Test psi I69a ~ ~ OA sus ~ 600 600 600
Interval avRTST p~ P Tubing Iz~o I~~o i~~o v~o
Notes: 2.2 BBLS diesel pumped; no exceptions noted. -
/)r
''-.~ '~ , I ~' d ~~~`-
Monday, August 02, 2010 Page 1 of ]
.
.
~
ConocoPhillips
Alaska
:/1ÚP ~~; ~
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
L~~£!.s,~ ,i;ìiÎ ~ ,;¡;¡~ ,~DlIZ. ~M!1i1¡j~~oj)
JJ\tl~~\[f 'ow 4Sf Uff~ ~U8B~@ í':.ImT!frnt~330n
,Q.1'Iel1MAOO
,!,\m;i1ur~gt:
March 24, 2007
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West th Avenue, Suite 100
Anchorage, AK 99501
avo:J..,- d-- 50
Dear Mr. Maunder:
Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). Some of
these wells were found to have a void in the conductor by surface casing annulus. The voids that
were greater than 3 feet were first filled with cement to a level of approx. 1.0 foot. The
remaining volume of annular void respectively was coated with a corrosion inhibiter, RG2401
engineered to prevent water from entering the annular space. As per previous agreement with
the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and
meets the requirements of form 10-404, Report of Sundry Operations.
The cement top-fill operation was completed on March 21st, 2007. Schlumberger Well Services
mixed 15.7 ppg Arctic set I in a blender tub. The cement was pumped into the conductor bottom
and cemented up via a hose run to the existing top of cement. The corrosion inhibitor sealant
was pumped in a similar manner March 21 st - 22n , 2007. The attached spreadsheet presents the
well name, top of cement depth prior to filling, and volumes used on each conductor.
Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions.
Sincerely,
Œ7#
;::: Arend -
ConocoPhillips Well Integrity Field Supervisor
~
~~NED MAR 2 B 2007
Attaclunent
.
.
ConocoPhillips Alaska Inc.
Suñace Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Alpine Field
March 24,2007
Initial top of
Well Name PTO # cement
ft
Final top of Cement top off
cement date
ft
Corrosion
RG casing filler inhibitor! sealant
vol. date
al
.
.
ConocoPhillips Alaska Inc.
Suñace Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Alpine Field
March 24,2007
Initial top of
Well Name PTO # cement
ft
Final top of Cement top off
cement date
ft
Corrosion
RG casing filler inhibitor! sealant
vol. date
al
MEMORANDUM
.
State of Alaska
.
Alaska Oil and Gas Conservation Commission
TO:
Jim Regg
P.I. Supervisor
~ C'/'2^/~/cc
\ /\ £"" j)'J<-' VV
'\ C1¿l ;
DATE: Wednesday, August 30,2006
SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA INC
CD2-08
COLVILLE RIV UNIT CD2-08
d,,o 'J.- 'J-5D
FROM:
Chuck Scheve
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I. Suprv -J75iZ--
Comm
Well Name: COLVILLE RIV UNIT C02-08 API Well Number 50-103-20442-00-00 Inspector Name: Chuck Scheve
Insp Num: mitCS060827 I 92633 Permit Number: 202-250-0 Inspection Date: 8/27/2006
Rei Insp Num
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well CD2-08 Type Inj. G TVD 6776 fA 1400 2500 2480 2480
P.T. 2022500 TypeTest SPT Test psi 1694 OA 600 600 600 600
Interval 4YRTST P/F P /Tubing 3100 3100 3100 3100
Notes Pretest pressures were observed and found stable. Well demonstrated good mechanical integrity.
NON-CONFIDENTIAL
SCANNED SEP 0 ß 200B
Wednesday, August 30, 2006
Page I of I
e
e
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFíche\CvrPgs _Inserts\Microfilm _ Marker.doc
)
)
OCT 2 6 2.005
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501-3539
Œ~
I~!\ !:r f~!h ":' ·\\('·::'j:':;';,·'t:':!
January 27;,\·~ij()4·" .,,'"
RE: MWD Formation Evaluation Logs: CD2-08,
AK-MW-2260902
CD2-08: :fi-I] J If Co
Digital Log Images:
50-103-20442-00
1 Cp Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED
COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
&;ANNED NO" 0 2 '2005
Date: ) /1.11 V J...Ato-r-
Signed:
,~c o}k¡
;\ t\ À - .¿.~~
Fj~
~ MCf\- M~ r;
DATA SUBMITTAL COMPLIANCE REPORT
3/7/2005
/~úA ;?ðJ~ Aó'Ò3
API No. 50-103-20442-00-00
~~)
Well Name/No. COLVILLE RIV UNIT CD2-08
Permit to Drill 2022500
Operator CONOCOPHILLlPS ALASKA INC
7024 ---- Completion Date 2/8/2003""-
Completion Status WAGIN
Current Status WAGIN
MD 18050 ..--- ND
---
REQUIRED INFORMATION
Samples No
Mud Log No
Directional Survey Yes
DATA INFORMATION
Types Electric or Other Logs Run: GRlRes
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint)
Logl Electr
Data Digital Dataset
~~__~~d/Fnnt Numbe~ame
D D Asc Directional Survey
~ D VÍ1671
~( LIS Verification
lkpt Directional Survey
?Rpt Directional Survey
I
~t Directional Survey
c./Gg Temperature
1L09 Cement Evaluation
Log Cement Evaluation
,ED C Asc f'l2395 Induction/Resistivity
-~
/'
-
Interval OHI
Start Stop CH
0 18050
2866 17984 Open
2866 17984 Open
349 18050 Open
349 18050 Open
0 349 Open
32 11857 Case
10850 11890 Case
Log Log
Scale Media
Run
No
Received
2/3/2005
4/17/2003
4/17/2003
4/22/2003
4/22/2003 MWD
Comments
IIFR (Sag Corrected)
4/22/2003 GYRO
5/8/2003
4/14/2003 Cement Bond Log
PSP/SCMT-BB - MD
Cement Bond Log
PSP/SCMT-BB - ND
Rap, DGR, EWR
Horizontal Presentation -
MWD
ROP, DGR, EWR
Horizontal Presentation -
MWD
Rap, DGR, EWR
Horizontal Presentation -
MWD
ROP, DGR, EWR
Horizontal Presentation -
MWD
25 Col
5 Col
5 Col
25
25
25
25
10850 11890 Case 4/14/2003
114 18050 Open 2/12/2004
114 18050 Open 2/12/2004
114 18050 Open 2/12/2004
114 18050 Open 2/12/2004
'<~
CAse 12395 Rate of Penetration
ED
/'
'ED
c/
C Pdf 12395 I nduction/Resistivity
C Pdf 12395 Rate of Penetration
v
-....ED
--._-
Well Cores/Samples Infonnation:
Sample
Set
Number Comments
Interval
Start Stop
Name
Sent
Received
DATA SUBMITTAL COMPLIANCE REPORT
3n /2005
Permit to Drill 2022500
Well Name/No. COLVILLE RIV UNIT CD2-08
Operator CONOCOPHILLlPS ALASKA INC
API No. 50-103-20442-00-00
MD 18050
TVD 7024
Completion Date 2/8/2003
Completion Status WAGIN
Current Status WAGIN
UIC Y
ADDITIONAL INFORMATION
Well Cored? Y ®
Chips Received? "V't-N-
Analysis ~
Received?
Daily History Received?
~
@N
Formation Tops
"-,"
Comments:
-------~-
~
Date:
~ c¡ f'!Lcv,- :¿Ó-ò j'-
--------
Compliance Reviewed By:
----.~
)
AOGCC
Helen Warman
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well CD2-08(Sag Corrected)
Dear Dear Sir/Madam:
Enclosed is one disk with the *.PTT and *.PDF files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
18,050.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND
RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF: .
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Date 3 Fé-L~M>'-- Signed
~~~ oLLJ
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Carl Ulrich
Survey Manager
Attachment(s)
01-Feb-05
~;< G) - ~)-Ù
)
)
c9 Od' ;)50
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501-3539
January 27,2004
RE: MWD Fonnation Evaluation Logs: CD2-08,
AK-MW-30009
CD2-08:
Digital Log Images~"
50-103-20442-00 J d 395'
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNIN"G THE ATTACHED
COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Speny-Sun Drilling SeIVices
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
Date:
Sign~\.:"~ "'\)'.9 ~
RECEIVED
r··:-~p 1 ~.: ~O\J04
. ~. :...J .. . '- \j
,¿\iP.1ska on & Gas Cons. Commøtn
An,momge
~~j."\~~~~
Schlumberger
NO. 2758
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TIN: Beth
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Alpine
Color
Well Job# Log Description Date BL Prints CD
CD2-36 ó(Li~-C\/l 23115 SCMT 03/25/03
CD2-08~~ ~~ TEMPERATURE LOG 03/01/03 1
_____"-/J RE:Ct:fVED
SIG~ ~~ ( I. Y DATE: M.4 y 08 20Q3
Alaaff8 Oii & Gas Cons. I' '.
Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. A,ndJorage ~
04/18/03
""-~'
'-
)
MEMORANDUM
)
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Randy Ruedrich ~
Commissioner , \
..;t1 0:3
THRU: Jim Regg '\Zet(q'1
P.I. Supervisor
DATE: April 26, 2003
SUBJECT: Mechanical Integrity Test
Canoco Phillips
Alpine
CD2-0B
CRU
FROM: Chuck Scheve
Petroleum Inspector
NON· CONFIDENTIAL
Well CD2-08
P.T.D. 202-250
Notes: Initial test
Well
P.T.D.
Notes:
Well
P.T.D.
Notes:
Well
P.TD.
Notes:
Well
P.TD.
Notes:
Type INJ. Fluid Codes
F = FRESH WATER INJ.
G = GAS INJ.
S = SALT WATER INJ.
N = NOT INJECTING
Type Inj.
Type test
Type Inj.
Type test
Type Inj.
Type test
Type Inj.
Type test
Type Inj.
Type test
s
P
Packer
T.V.D.
Test psi
Tubing
Casing
Depth
6736
1684
Initial
650
2450
Pretest
650
900
15 Min. 30 Min.
650 650
2425 2425
Interval
P/F
I
f
TV.D. Tubing
Test psi Casing
TV.D. Tubing
Test psi Casing
T.V.D. Tubing
Test psi Casing
T.V.D. Tubing
Test psi Casing
Interval
P/F
Interval
P/F
Interval
P/F
Interval
P/F
Type Test
M= Annulus Monitoring
P= Standard Pressure Test
R= Internal Radioactive Tracer Survey
A= Temperature Anomaly Survey
D= Differential Temperature Test
Interval
1= Initial Test
4= Four Year Cycle
V= Required by Variance
W= Test during Workover
0= Other (describe in notes)
Test's Details
I traveled to the Conoco Phillips Alpine Field and witnessed the initial MIT on well CD2-08. The pretest tubing and
casing pressures were observed and found to be stable. The pressure test was then performed for 30 minutes with the
well demonstrating good mechanical integrity.
M.I.T.'s performed: 1
Attachments:
M IT report form
5/12/00 L.G.
Number of Failures: º
Total Time during tests: 1 hour
cc:
M IT CRU CD2-0B 4-26-03 CS.xls
5/7/2003
)
)
aoa-~50
II b 7/
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7t11 Avenue, Suite 100
Anchorage, Alaska 99501-3539
April 16, 2003
RE: MWD Formation Evaluation Logs - CD2-08,
AK-MW-2260902
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this transmittal letter to the attention of:
Rob Kalish, Sperry-Sun Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518
1 LDWG formatted Disc with verification listing.
API#: 50-103-20442-00.
~.~~.
RECEIVED
APR 1 7 2003
A1as~a Qi-¡ & Gas Cons. Commimm
M....h1Jf4ge
)
, G. C. Alvord
) Alpine Drilling Team Leader
Drilling & Wells
Conocó'Phillips
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-265-6120
April 15, 2003
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Subject: Well Completion Report for CD2-0S (APD 202-250)
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Well Completion Report for the
recent drilling operations on the Alpine well CD2-0S.
If you have any questions regarding this matter, please contact me at 265-6120.
Sincerely,
At:oz
G. C. Alvord
Alpine Drilling Team Leader
CPAI Drilling and Wells
GCA/skad
RECEIVED
APR 1 6 2003
Alaska Oil & Gas Cons. Commission
Anchorage
ORIGINA,I-
)' STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMMISSION
WE~L COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of well
Classification of Service Well
Oil 0 Gas 0 Suspended D
2. Name of Operator
ConocoPhillips Alaska, Inc.
3. Address
P. O. Sox 100360, Anchorage, AK 99510-0360
4. Location of well at surface
Abandoned 0
Service 0
50-103-20442-00
1647' FNL, 1554' FEL, Sec. 2, T11 N, R4E, UM (ASP: 371689, 5974711); ·>r":.~~;';~~.:J:(;i:t·]
At Top Producing Interval ,.,., -_. ~
\ 2.' g't> ~
291' FNL, 1203' FEL, Sec. 36, T12N, R4E, UM (ASP: 377426, 5981252) : ......----. "
I . -7" "I""t'r I
At T~tal Depth I ;' _..~'_~J> _.. ~
101 FNL, 4130 FEL, Sec. 25, T12N, R4E, UM (ASP: 374588, 5986767) ~--,.,.,,,,._,~~.,,_,,,,_:J
5. Elevation in feet (indicate KB, OF, etc.) 6. Lease Designation and Serial No.
RKS 36' & 52.7' AMSL ADL 380075 & 380096 & 25530
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband.
,
January 20, 2003 February 6, 2003 February 8, 2003
17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey
18050' MD 17024' TVD 18050' MD I 7024' TVD YES 0 No D
Colville River Unit
10. Well Number
CD2-08
11. Field and Pool
Colville River Field
Alpine Oil Pool
15. Water Depth, if offshore
NI A feet MSL
20. Depth where SSSV set
2235' Landing Nipple
16. No. of Completions
21. Thickness of Permafrost
1629' MD
22. Type Electric or Other Logs Run
G R/Res
23.
CASING SIZE WT. PER FT.
16" 62.5#
9.625" 36#
7" 26#
GRADE
H-40
J-55
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
TOP BOTTOM
Surface 114'
Surface 2889'
Surface 12242'
HOLE SIZE
CEMENTING RECORD
AMOUNT PULLED
42"
12 cu yds Portland Type III
422 sx AS III Lite, 244 sx Class G
300 sx Class G Neat
12.25"
8.5"
24. Perforations open to Production (MD + TVD of Top and Bottom and
interval, size and number)
25.
SIZE
4.5"
TUBING RECORD
DEPTH SET (MD)
11027'
PACKER SET (MD)
1 0907'
open hole completion from 12242' - 18050'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
N/ A N/A
27.
Date First Production
March 25, 2003
Date of Test Hours Tested
N/A
Flow Tubing
Casing Pressure
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Injector
Production for OIL-BBL GAS-MCF
Test Period>
Calculated OIL-BBL
W A TER-BBL
CHOKE SIZE
GAS-OIL RATIO
GAS-MCF
WATER-BBL
OIL GRAVITY - API (corr)
press.
28.
psi
24-Hour Rate>
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips.
N/A
RECEIVED
APR 1 6 2003
Alaska Oil & Gas Cons. Commission
Anchorage
Form 10-407 Rev. 7-1-80
CC~I~U~Q'J ~ErE~SE\SID, E
o :-\ I lJ \ ~ /-.2,\ '
Submit in duplicate
tABDMS BFl
~~
APR ~ n 'J ';1,"/ ~i
29.
)
30.
}
GEOLOGIC MARKERS
FORMATION TESTS
NAME
MEAS.DEPTH
TRUE VERT. DEPTH
Include interval tested. pressure data, all fluids recovered and gravity.
GOR, and time of each phase.
CD2-08
Seabee Form.
Nanushuk
Gamma Ray Shale
Kalubik
Kuparuk Form.
Miluveach
Top Alpine D
Top Alpine C
Alpine A
Base Alpine C
Base Alpine C Inverted
Top Alpine C inverted
Top Alpine C
Top Alpine C inverted
Top Alpine C
2911'
5498'
10495'
11156'
11280'
11433'
11747.5'
11836'
not present
14858'
15275'
16776'
16877'
17408'
17758'
2398'
3834'
6535'
6838'
6885'
6935'
7005'
7019'
not present
7033'
7030'
7008'
7007'
7013'
7013.5'
N/A
RECEIVED
APR 1 6 2003
Alaska Oil & Gas Cons. Commission
Anchorage
31. LIST OF ATTACHMENTS
Summary of Daily Operations, Directional Survey
32. I hereby certify that the following is true and correct to the best of my knowledge.
Questions? Call Vern Johnson 265-6081
Signed A...t.( 0tZ.
Chip Alvord
Title
Alpine Drilling Team Leader
Date 4('~--( 03
Prepared by Sharon Allsup-Drake
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other
spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in
item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each
additional interval to be separately produced, showing the data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
ORIGINÞ.
)
)
CbnocoPhinipsAlaska ,
Operatiol1sSuml'1"lClryRepótt
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-08
CD2-08
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
Start: 1/18/2003
Rig Release:
Rig Number:
Spud Date: 1/17/2003
End:
G rou p:
Sub
From -To Hours Code Code Phase
Description of Operations
1/18/2003 00:00 - 02:30 2.50 MOVE MOVE MOVE Move pit and engine module. Skid floor to moving position
02:30 - 03:30 1.00 MOVE MOVE MOVE Move sub from CD2-35 to CD2-08
03:30 - 04:30 1.00 MOVE POSN MOVE Spot and level sub over CD2-08
04:30 - 05:30 1.00 MOVE POSN MOVE Skid floor to drilling position
05:30 - 06:00 0.50 MOVE POSN MOVE Spot pit and engine module
06:00 - 08:00 2.00 MOVE POSN MOVE Spot pipe shed and hook up lines. Accept rig @ 08:00 hrs 1/18/03
08:00 - 10:00 2.00 DRILL RIRD SURFAC N/U riser and take on mud
10:00 - 11 :30 1.50 DRILL OTHR SURFAC Cut and slid 60' of drilling line
11 :30 - 16:30 5.00 DRILL PULD SURFAC P/U 5" d.p. from pipeshed, 9 stds HWDP, 1 std NM flex collars and
stand back in derrick
16:30 - 18:00 1.50 DRILL PULD SURFAC P/U motor, bit, float sub, pony collar. Fill stack and test mud line to
3500 psi
18:00 - 18:30 0.50 DRILL REAM SURFAC Clean out ice from conductor from 43' to 113'. Stand back hwdp and
blow down top drive
18:30 - 20:00 1.50 DRILL PULD SURFAC P/U BHA
20:00 - 00:00 4.00 DRILL OTHR SURFAC Stand back BHA and wait on weather. Prep casing, clean rig and
assemble unihead. Wind gusting to 40 mph @ -6 deg. F
1/19/2003 00:00 - 00:00 24.00 WAlTON WOW SURFAC Wait on weather. Clea pit room. Repair guide rollers on Top Drive.
General maintenance
1/20/2003 00:00 - 06:00 6.00 WAlTON WOW SURFAC Wait on weather
06:00 - 08:00 2.00 DRILL PULD SURFAC Finish making up BHA. Upload MWD. Adjust AKO and orient
08:00 - 08:30 0.50 DRILL SFTY SURFAC Hold pre-spud meeting
08:30 - 00:00 15.50 DRILL DRLG SURFAC Drill from 114' to 1310'- 1273' TVD. ART =4.4, AST =5.5, ADT =9.9.
PUW=120K, SOW=115K, ROT =120K, Torque= 6500 on, 5500 off
1/21/2003 00:00 - 15:00 15.00 DRILL DRLG SURFAC Drill from 1310' to 2900', ART=5.4, AST= 4.26, ADT=9.66, TVD=2392,
PU=135, SOW=125, Rot=130, Tork=10,000 on, 6500 off, WOB= 20-35,
SPP=2250, RPM=0-50, strokes = 140 total
15:00 - 16:00 1.00 DRILL CIRC SURFAC CBU 2 x @ 14 bpm, 1730 psi, 70 rpm, check flow
16:00 - 18:00 2.00 DRILL WIPR SURFAC POOH to HWDP. Check flow
18:00 - 18:30 0.50 DRILL WIPR SURFAC POOH to 250'. Check flow
18:30 - 19:30 1.00 DRILL WIPR SURFAC RI H to 2830'
19:30 - 21 :00 1.50 DRILL CIRC SURFAC Wash to bottom and circulate 2 bottoms up.
21 :00 - 22:30 1.50 DRILL TRIP SURFAC POOH to HWDP-check flow. POOH wi HWDP-check flow
22:30 - 00:00 1.50 DRILL PULD SURFAC UD BHA and adjust motor
1/22/2003 00:00 - 00:30 0.50 DRILL PULD SURFAC Finish UD BHA
00:30 - 01 :00 0.50 CASE RURD SURFAC Clear floor
01 :00 - 02:00 1.00 CASE RURD SURFAC R/U casing equipment. Hold pre-job safety meeting
02:00 - 06:00 4.00 CASE RUNC SURFAC P/U and RIH wI 68 jts of 9-5/8" 36# J-55 BTC casing to 2889'. P/U
wt=150, SOW=120. Ran 40 centralizers: 1/jt first 12 jts, 1/every other jt
jt 14 to surface.
06:00 - 07:00 1.00 CASE RURD SURFAC RID casing tools and M/U cementing head
07:00 - 08:00 1.00 CASE CIRC SURFAC Circ and condition mud @ 6 bpmw/270 psi while reciprocating pipe
08:00 - 10:30 2.50 CEMENT PUMP SURFAC Pump 40 bbl viscosified water wi nut plug wi rig pump. Pump 5 bbl
water wI DS and pressure test lines to 2500 psi. Mix/pump 50 bbl
Mudpush @ 10.5 ppg. Mix/pump 333.5 bbl Lead (422 sx) @ 10.7 ppg.
Had nut plug in returns. Mix/pump 53.5 bbl Tail @ 15.8 ppg (244 sx).
Drop top plug. Displace wi 20 bbl water/195.8 bbl mud. CIP @ 10:20
1/22/03. Check floats-OK
10:30 - 11 :00
11 :00 - 12:00
12:00 - 13:00
13:00 - 14:30
0.50 CEMENT RURD SURFAC RID cement hed and UD landing jt
1.00 CEMENT RURD SURFAC RID riser
1.00 CASE NUND SURFAC N/U unihead. and test to 1000 psi-OK
1.50 CASE NUND SURFAC N/U BOPE, Change out TD saver sub
Printed: 2/24/2003 4:41 :50 PM
") )
, ConocoPhillipsAléiska Page 20f7
Operations Summary.. Report
Legal Well Name: CD2-08
Common Well Name: CD2-08
Event Name: ROT - DRILLING
Contractor Name: doyon1 @ppco.com
Rig Name: Doyon 19
Date From - To Hours Code Sub Phase
Code
1/22/2003 14:30 - 18:30 4.00 CASE DEaT SURFAC
18:30 - 19:30 1.00 CASE OTHR SURFAC
19:30 - 22:00 2.50 DRILL PULD SURFAC
22:00 - 23:00 1.00 DRILL TRIP SURFAC
23:00 - RIGMNT RSRV SURFAC
1/23/2003 00:00 - 00:30 0.50 RIGMNT RSRV SURFAC
00:30 - 02:30 2.00 DRILL DRLG SURFAC
02:30 - 03:00 0.50 DRILL CIRC SURFAC
03:00 - 04:00 1.00 DRILL DEaT SURFAC
04:00 - 07:30 3.50 CEMENT COUT SURFAC
07:30 - 08:00 0.50 DRILL CIRC SURFAC
08:00 - 08:30 0.50 DRILL FIT SURFAC
08:30 - DRILL DRLG INTRM1
1/24/2003 00:00 - 09:00 9.00 DRILL DRLG INTRM1
09:00 - 11 :30 2.50 DRILL CIRC INTRM1
11 :30 - 16:00 4.50 DRILL WIPR INTRM1
16:00 - 16:30 0.50 DRILL CIRC INTRM1
16:30 - 18:00 1.50 DRILL WIPR INTRM1
18:00 - 18:30 0.50 DRILL REAM INTRM1
18:30 - 00:00 5.50 DRILL DRLG INTRM1
1/25/2003 00:00 - 22:00 22.00 DRILL DRLG INTRM1
22:00 - 23:30 1.50 DRILL CIRC INTRM1
23:30 - 00:00 0.50 DRILL WIPR INTRM1
1/26/2003 00:00 - 04:30 4.50 DRILL WIPR INTRM1
04:30 - 06:00 1.50 DRILL WIPR INTRM1
06:00 - 07:00 1.00 DRILL REAM INTRM1
07:00 - 00:00 17.00 DRILL DRLG INTRM1
1/27/2003 00:00 - 08:00 8.00 DRILL DRLG INTRM1
08:00 - 10:00 2.00 DRILL CIRC INTRM1
10:00 - 13:30 3.50 DRILL WIPR INTRM1
13:30 - 15:00 1.50 DRILL CIRC INTRM1
15:00 - 17:30 2.50 DRILL WIPR INTRM1
17:30 - 19:00 1.50 DRILL WIPR INTRM1
19:00 - 20:00 1.00 DRILL REAM INTRM1
20:00 - 00:00 4.00 DRILL DRLG INTRM1
1/28/2003 00:00 - 12:00 12.00 DRILL DRLG INTRM1
Start: 1/18/2003
Rig Release:
Rig Number:
Spud Date: 1/17/2003
End:
Group:
Description of Operations
Test BOPE. John Crisp, AOGCC, waived witnessing the test
R/U bales, elevators and install wearring. R/U geopilot
P/U BHA. Upload MWD, RIH w/ NMDC
RIH w/ HWDP. Change out to 4" d.p. equipment. RIH w/ 1stand of d.p.
and test geopilot lines to 4000 psi.
Cut 263' drilling line
Finish cutting drilling line.
Continue RIH and tag cmt @ 2747'
Circ and condition mud @ 12 bpm, 1860 psi
R/U and test casing to 2500 psi for 30 min.-OK. R/D
Drill hard cement, floats, and 20' of new hole to 2920'
Circ and condition mud @ 12 bpm @ 2000 psi
R/U and perform FIT to 16.0 ppg (800 psi, 2387' TVD, 9.6 ppg mud)
Drill from 2920' to 4411', TVD=3241', PUW=145K, SOW=110K,
ROT=125K, Torque On/Off=8000/7500, RPM=180, WOB=8-15K,
SPP=2010 psi, 130 spm =546 gpm
Drill from 4411' to 5335'. ECD's climbing to 11.6 ppg EWM.
TVD=3742', ADT =6.3
Circ sweep. Circ 2nd sweep. Stand back 3 stands while circulating
Pump out of hole from 5050' to 2738' Clean clay off of "ghost" reamer.
CBU. ECD's dropped from 11.2 to 10.3 ppg
Monitor well and RIH to 5225'
Wash and ream from 5225' to 5335' for safety
Drill from 5335' to 5814'. TVD=3990.8', ADDT=3.7
Drill from 5814' to 8180', ART=15.5, PU=215k, SO=130k, ROT=155,
Torque= 12500 on, 11500 off, spp=3380 psi, RPM=170, WOB=15/20,
SPM=140, 588 gpm
Circ and condition mud while pumping out of hole
POOH on trip tank
Attempt to POOH on trip tank. Fluid level wouldn't drop. POOH w/
rotation and pump from 7798' to 5316'
RIH to 8078
Ream from 8078' to 8180' for safety. CBU
Drill from 8180' to 9924', TVD= 6222', ART= 12.1, PUW= 24, SOW=
135, ROT = 170, Torque = 15,000 on, 14,000 off. RPM = 170,
WOB=15/22, SPP= 3670, spm= 130, gpm = 588
Drill from 9924' to 10758', TVD=6665', ADT=6.0
Circ high vis sweep and high density sweep until hole clean.
Pump and rotate out of the hole from 10758' to 9135'. Torque
increased to 19k ft-Ibs and ECD's increased from 11.25 to 11.9 ppg.
Mix and pump hi-vis sweep and condition mud @ 588 gpm, 3480 psi,
150 rpm. ECD's decreased to 10.98 ppg
Continue pumping and rotating out of hole to 8084'. Observe
well-static. POOH on trip tank to 7893-hole taking good fill
RIH to 10665'
Wash and ream to bottom for safety
Drill from 10758' to 11061' TVD= 6801'. ADT =2.9, P/U=250k,
S/0=135, ROT =180, Torque=14500 on/14000 off. RPM=150-170,
WOB=10/21, SPP=3640, 130 spm, 546 gpm
Drill 8 1/2" hole w/ GeoPilot f/ 11,061' to 12,000' MD 7032' TVD
RPM -170 WOB -10/20 k GPM - 504 @ 3420 psi
String wt. PU 260 SO 135 ROT 175
Torque on/off 15,500/15,000 ft. Ibs.
Printed: 2/24/2003 4:41 :50 PM
) )
ConocoPhillipsAlaska Page 3 of7
,Operations Summary Report
Legal Well Name: CD2-08
Common Well Name: CD2-08 Spud Date: 1/17/2003
Event Name: ROT - DRILLING Start: 1/18/2003 End:
Contractor Name: doyon1 @ppco.com Rig Release: Group:
Rig Name: Doyon 19 Rig Number:
Date From - To Hours Code Sub Phase Description of Operations
Code
1/28/2003 00:00 - 12:00 12.00 DRILL DRLG INTRM1 ADT- 8.9 hrs
12:00 - 14:30 2.50 DRILL DRLG INTRM1 Drill 8 1/2" hole w/ GeoPilot f/ 12,000' to 12,252' MD
7048' TVD ADT - 1.8 hrs.
RPM - 170 WOB 1 0/2 Ok GPM 504 @ 3420 psi
String wt. PU 260 SO 135 ROT 175
Torque onloff 15,500/15,000 ft. Ibs.
14:30 - 19:30 5.00 DRILL CIRC INTRM1 Pump Hi vis sweep & std back 1 std to 12,158' - Pump hi- density
sweep & circulate hole clean - @ 504 GPM @ 150 RPM - std back 1
std. to 12,063' - Pump hi vis sweep & circulate - std back 1 std every 30
mins. to 11,777' - shakers clean - monitor well - static
ECD before pumping sweeps 11.04 after 10.71
19:30 - 00:00 4.50 DRILL TRIP INTRM1 POOH f/ 11.777' - pumping out @ 10 bblsl min & 60 RPM - to 10,347'
- Blow down TO - Switch over to trip tank - POOH fl 10,347' to 10,265' -
pulling tight 50k over @ 10,265' - Continue to pump out f/ 10,347' to
10,058'
1/29/2003 00:00 - 01 :30 1.50 DRILL WIPR INTRM1 Continue wiper trip - pump out fl 10,058' to 9675' - monitor well - static -
POOH fl 9675' to 9090' on trip tank - hole taking proper fill
01 :30 - 03:00 1.50 DRILL WIPR INTRM1 RIH fl 9090' to 12,158'
03:00 - 03:30 0.50 DRILL REAM INTRM1 Safety wash & ream fl 12,158' to 12,252'
03:30 - 05:30 2.00 DRILL CIRC INTRM1 Circulate hi-vis sweep @ 567 GPM - std. back 1 std DP every 30 mins.
to 11,950' - observed large amount of sand fl sweep @ shakers
05:30 - 08:30 3.00 DRILL CIRC INTRM1 Ciro & mix hi - density sweep - pump sweep around @ 567 GPM -
Observed large amount of nut plug @ shakers on bottoms up * note
there was no nut plug mixed in either sweep -std. back 1 std DP to
11,860' - monitor well - static
08:30 - 17:00 8.50 DRILL TRIP INTRM1 POOH - pump & back ream fl 11 ,860' to 10,344' wI 60 RPM & 7
bblslmin (20 stds total including 5 std while circ. sweeps) - monitor well
- static - POOH fl 10,344' to 7480' on trip tank - hole taking proper fill
and no excessive drag - Pumped dry job @ 7480' - Blow down TD-
Continue POOH to 2647' on trip tank - hole in good condition
17:00 - 17:30 0.50 DRILL PULD INTRM1 LD XO - Ghost reamer - XO - monitor well - static -
17:30 - 18:30 1.00 DRILL TRIP INTRM1 Continue to POOH f/2647' to 630' (top of BHA)
18:30 - 19:00 0.50 DRILL OTHR INTRM1 Change over to 5" handling equipment
19:00 - 22:00 3.00 DRILL PULD INTRM1 Handle BHA - std back 5" HWDP - jars - 6 3/4" flex DC's - LD MWD -
Geo Pilot - bit - housekeeping rig floor
22:00 - 00:00 2.00 DRILL OTHR INTRM1 PU stack washer & flush stack - Pull wear bushing - set test plug wI 7"
test jt. - Change top pipe rams fl 3 1/2" x 6" VBR to 7"
1/30/2003 00:00 - 01 :00 1.00 DRILL OTHR INTRM1
01 :00 - 02:00 1.00 CASE RURD INTRM1
02:00 - 02:30 0.50 CASE SFTY INTRM1
02:30 - 16:30 14.00 CASE RUNC INTRM1
* Note: BOP test extension granted by AOGCC
Test 7" pipe ram & door seal to 3500 psi - pull test plug & test jt. - set
thin wall wear bushing
RU to run 7" casing - MU Frank's fill up tool
Held pre job safety meeting wI rig crew & casing tong operator
Begin running 7" 26# L-80 MBTC casing - FS joint, 1 jt., FC joint, 1 jt. -
BakerLoc first 4 connections - Pump through shoe track OK - Ran 66
jts.- 7" 26# L-80 MBTC casing to 2895.77' - Circulate casing volume @
2895' - 5 B/M @270 psi - string wt. Up 115 On 110 - Continue running
7" 26# L-80 MBTC casing to 7037' (170 jts total) - Circulate bottoms up
@ 7037' @ 5 B/M @ 750 to 600 psi - string wt. Up 210 On 128 -
Continue running 7" 26# L-80 MBTC casing to 10,763' (260 jts. total) -
Attempt to circulate btms up @ 4.5 B/M @ 9030 psi - string beginning
to take wt. - unable to pull up & break over -pulled up to 350 k - shut
Printed: 2/24/2003 4:41 :50 PM
)
)
yonocÖPhillips Alaska
O.pérati onsSÜ mmaryRepott
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-08
CD2-08
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
Sub
Hours, Code· Code Phase
14.00 CASE RUNC INTRM1
1/30/2003
02:30 - 16:30
16:30 - 18:00
1.50 CEMENTCIRC INTRM1
18:00 - 20:30
2.50 CEMENT PUMP INTRM1
20:30 - 21 :30 1.00 DRILL OTHR INTRM1
21 :30 - 22:30 1.00 WELCTL BOPE INTRM1
22:30 - 00:00 1.50 WELCTL BOPE INTRM1
1/31/2003 00:00 - 04:00 4.00 WELCTL BOPE INTRM1
04:00 - 04:30 0.50 WELCTL BOPE INTRM1
04:30 - 05:30 1.00 RIGMNT RSRV INTRM1
05:30 - 09:00 3.50 DRILL PULD INTRM1
09:00 - 13:00 4.00 DRILL TRIP INTRM1
13:00 - 14:30 1.50 RIGMNT RSRV INTRM1
14:30 - 17:30 3.00 DRILL TRIP INTRM1
17:30 - 18:30 1.00 DRILL REAM INTRM1
18:30 - 20:00 1.50 DRILL CIRC INTRM1
20:00 - 21 :00 1.00 DRILL OTHR INTRM1
21 :00 - 23:30 2.50 CEMENT DSHO INTRM1
23:30 - 00:00 0.50 DRILL DRLG INTRM1
2/1/2003
00:00 - 01 :00
01 :00 - 02:00
02:00 - 04:00
04:00 - 12:00
1.00 DRILL
1.00 DRILL
2.00 DRILL
8.00 DRILL
CIRC INTRM1
FIT INTRM1
CI RC PROD
DRLH PROD
Start: 1/18/2003
Rig Release:
Rig Number:
Spud Date: 1/17/2003
End:
Group:
Description of Operations
down pumps & continue running 7" 26# L-80 MBTC casing to 12,205'
(295 jts. total) - MU hanger & landing jt. land 7" casing on fluted
mandrel hanger wI shoe @ 12,242' - FC @ 12,155' - RD fill up tool -
MU cement head
Circulate & condition for cement job lower YP to 19 - beginning rate 1.8
BIM @ 860 psi - final rate 5 B/M @ 740 psi - Unable to reciprocate pipe
PJSM - Cement 7" casing - Pumped 5 bbl Arco wash - test lines to
3500 psi - pumped 15 bbls Arco wash - Pumped 50 bbls 12.5 ppg
Mudpush XI spacer - Dropped btm plug - Mixed & pumped 300 sks (61
bbls) 15.8 ppg Class G wI 0.20% D046, 0.25% D065, 0.02% XE920, &
0.40% D-167 - @ 5 B/M @ 1000 psi - Dropped top plug - Pumped 20
bbl water fl Dowell - switch to rig pumps & displace wI 441.4 bbls 9.9
ppg LSND mud @ 6.8 B/M @ 530 psi to 1100 psi - slowed pumps to
3.5 B/M @ 880 psi for last 20 bbls of displacement - bumped plug wI
1300 psi - check floats - floats held - CIP @ 1954 hrs. - full returns
throughout job - RD cement head - LD landing jt.
Pull thin wall wear bushing - Install 7" x 95/8" pack off & test to 5000
psi for 1 0 mins.
Install test plug - change top pipe rams fl 7" to 3 1/2"x6" VBR
Begin to test BOPE
Test BOPE - Hydril to 250 psi low & 3500 psi high - pipe rams - blind
rams - choke manifold - ckoke & kill line valves -floor dart & safety
valves - TD I BOP valves
to 250 psi low & 5000 psi high - performed accumulator closure test -
Witnessing of test waived by Chuck Scheve AOGC,
Blow down lines, pull test plug - set wear bushing
Change out saver sub & grab dies on TD
MU 6 1/8" BHA - Up load MWD - change out drilling jars - RIH to 383' -
Test MWD
RIH w/6 1/8" drilling assembly - picking up 141 jts. 4" drill pipe fl pipe
shed
Slip & cut drill line 120' & adjust brakes
Continue RIH w/6 1/8" drilling assembly wI pipe fl derrick to 11,900' -
fill pipe every 2000'
Wash & ream fl 11,900' to 12,067' - tag up - clean out cement fl 12,067'
to 12,121'
Circulate bottoms up for casing test
RU & pressure test 7" casing to 3500 psi for 30 mins. RD
Drill out cement - wiper plugs - FC @ 12,155' - cement to FS @ 12,140'
- Drill out FS & clean out rat hole to 12,252'
Drill 20' new hole fl 12,252' to 12,272' MD 7050' TVD
ADT-.2 hrs. - RPM - 60 WOB 8k GPM 197@ 2000 psi
String wt. PU 325 SO 120 Rot 170
Torque onloff 18,500/18,000 ft.lbs.
Circulate hole clean for FIT - 5 B/M @ 1700 psi
RU - perform FIT to 12.5 ppg EMW wI 970 psi wI 9.9 ppg mud - RD
Change well over to 8.8 ppg Flo-Pro - shut down monitor well - static
Drill 6 1/8" horizontal section fl 12,272' to 12,790' MD 7049' TVD
RPM 50 WOB 6/8k GPM 211 @ 2200 psi
String wt. PU 225 SO 145 ROT 175
Torque onloff - 12,500/12,500 ft.lbs.
ADT- 4.90 hrs. = ART- 4.45 hrs. AST- ..45 hrs.
Printed: 2/24/2003 4:41 :50 PM
2/2/2003
00:00 - 12:00
12:00 - 00:00
2/3/2003
00:00 - 12:00
12:00 - 13:30
13:30 - 15:30
15:30 - 00:00
2/4/2003
00:00 - 10:00
10:00 - 12:00
12:00 - 00:00
2/5/2003
00:00 - 12:00
)
)
ConQcoPhillipsAlaska
Q.perations Summary Report
12.00 DRILL DRLH PROD
12.00 DRILL DRLH PROD
12.00 DRILL DRLH PROD
1.50 DRILL DRLH PROD
2.00 DRILL OTHR PROD
8.50 DRILL DRLH PROD
10.00 DRILL DRLH PROD
2.00 DRILL CIRC PROD
12.00 DRILL DRLH PROD
12.00 DRILL DRLH PROD
PageS of?
Start: 1/18/2003
Rig Release:
Rig Number:
Spud Date: 1/17/2003
End:
Group:
Legal Well Name: CD2-08
Common Well Name: CD2-08
Event Name: ROT - DRILLING
Contractor Name: doyon1 @ppco.com
Rig Name: Doyon 19
Date' From - To Hours Code Sub Phase
Code
2/1/2003 04:00 - 12:00 8.00 DRILL DRLH PROD
12:00 - 00:00 12.00 DRILL DRLH PROD
'Description of 'Operations
Drill 61/8" horizontal section f/12,790' to 13,649' MD 7030' TVD
RPM 70/80 WOB 5/8k GPM 210 @ 2100 psi
String wt. PU 215 SO 145 ROT 175
Torque onloff - 12,500 111 ,500 ft. Ibs.
ADT- 8.30 hrs. = ART-7.17 hrs. AST-1.13 hrs
Drill 6 1/8" horizontal section f/13,649' to 14,509' MD 7022' TVD
RPM - 80 WOB - 5/7 k GPM - 210 @ 2150 psi
String wt. - PU 215 SO 140 ROT 175
Torque onl off 11,500 110,500 ft. Ibs.
ADT - 8.73 hrs. = ART - 7.77 hrs. AST - .96 hrs.
Drill 6 1/8" hole f/14,509' to 15,081' MD 7034' TVD
RPM -70/80 WOB - 5/8 k GPM - 211 @ 2580 psi
String wt. - PU 220 SO - 135 ROT - 174
Torque onl off - 12,500/11,500 ft. Ibs.
ADT - 7.1 hrs. = ART - 4.86 hrs. AST - 2.24 hrs.
Drill 6 1/8" horizontal section f/15,081' to 15,795' MD 7019' TVD - ATD
- 9.82 hrs. = ART - 8.75 hrs. AST - .53 hrs.
RPM - 80 WOB - 5/7 k GPM - 211 @ 2600 psi
String wt. PU 215 SO 135 ROT 170
Torque on 1 off 12000/11000 ftIlbs.
Drill 6 1/8" horizontal section f/15,795' to 15,918' MD
Drilling break 40 ohm sand - hole taking fluid - 81 bblsl hr initial lose
rate - reduce pump rate to 2 bbls/m - Adding LCM to active system
while mixing LCM pill - 16.5 #/bbl - Pump LCM pill @ 2.5 bbls/m @
1330 psi - Resume drilling when LMC pill reached bit
Drill 61/8" horizontal section f/15,918' to 16,274' MD 7020' TVD
RPM 60/80 WOB 5/10 k GPM 190 @ 2510 psi (with AGS open)
String wt. PU 220 SO 125 ROT 175
Torque on loff 14000/13000
ADT- 6.14 hrs = ART- 3.81 hrs. AST - 2.33
Hole taking fluid @ -1+ 30 bbls/hr average - slowing to 10/15 bbls/hr @
report time
Total losses down hole 518 bbls.
Drill 6 1/8" horizontal section f/16,274' to 16,800' MD
7007' TVD - ADT - 7.88 hrs = ART- 7.51 hrs. AST- .37 hrs
RPM -70/80 WOB - 6/10 k GPM - 206 @ 2600 psi
String wt. PU 225 SO 125 ROT 170
Torque on I off 14000/13000
losses to formation 12 - 15 B/H
Circulate bottoms up for samples - 5 B/M @ 2350 psi
Drill 6118" horizontal section f/16,800' to 17,425' MD 7013' TVD
RPM - 70/80 WOB 6/10 k GPM 206 @ 2600 psi
String wt. PU 225 SO 125 Rat 170
Torque on loff 13000/12000 ft. Ibs.
ADT- 9.05 hrs. = ART - 8.45 hrs. AST - .6 hrs.
Losses to formation last 24hrs. 247 bbls
Total losses to formation - 765 bbks.
Drill 6 1/8" horizontal section f/17,425' to 17,659' MD 7022' TVD
RPM -70 WOB - 12/14 k GPM - 206 2550 psi
String wt. PU - 220 SO - 125 ROT - 170
Printed: 2/24/2003 4:41 :50 PM
)
)
ConocoPhillipsAlaska
OperationsSu I11l11aryRèport
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
2/5/2003
2/612003
2/712003
2/8/2003
CD2-08
CD2-08
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
Date
Sub
From~To Hours Code Code Phase
00:00 - 12:00
12.00 DRILL DRLH PROD
12:00 - 22:30
10.50 DRILL DRLH PROD
22:30 - 00:00
00:00 - 05:00
1.50 DRILL OTHR PROD
5.00 DRILL DRLH PROD
05:00 - 08:00 3.00 DRILL CIRC PROD
08:00 - 12:30 4.50 DRILL WIPR PROD
12:30 - 13:00 0.50 DRILL CIRC PROD
13:00 - 14:30 1.50 DRILL WIPR PROD
14:30 - 16:00 1.50 DRILL CIRC PROD
16:00 - 00:00
8.00 DRILL TRIP PROD
00:00 - 02:00 2.00 DRILL TRIP PROD
02:00 - 04:00 2.00 DRILL CIRC PROD
04:00 - 04:30 0.50 DRILL OBSV PROD
04:30 - 06:30 2.00 WELCTL CIRC PROD
06:30 - 09:00 2.50 WELCTL COND PROD
09:00 - 11 :00 2.00 WELCTL COND PROD
11 :00 - 13:30 2.50 DRILL TRIP PROD
13:30 - 19:00 5.50 DRILL TRIP PROD
19:00 - 20:30 1.50 RIGMNT RSRV PROD
20:30 - 00:00 3.50 DRILL TRIP PROD
00:00 - 02:00 2.00 DRILL PULD PROD
Page,6 of7
Start: 1/18/2003
Rig Release:
Rig Number:
Spud Date: 1/17/2003
End:
Group:
Description of Operations
Torque on I off 12500 I 12000
ADT - 6.9 hrs. = ART - 5.4 AST - 1.5 hrs.
Drill 61/8" horizontal section fl 17,659' to 17,851' MD 7019' TVD
RPM - 80 WOB - 7/10 k GPM -198 @ 2900 psi
String wt. PU 225 SO 120 ROT 170
Torque on/off 13,500 I 12,500 ft. Ibs.
ADT - 10.27 hrs.= ART - 6.77 hrs. AST - 3.5 hrs.
Fluid lost - 350 bbls last 24 hrs. Total losses - 1115 bbls
MWD tool lost pulse - trouble shoot MWD - unable to get real time data
Drill 6118" horizontal section fl 17,851' to 18,050' MD
7019' TVD - Total depth
RPM - 80 WOB - 8/10 k GPM - 198 @ 2700 psi
String wt. - PU 220 SO 120 ROT. 170
Torque on I off 13,000 112,000 ft. Ibs.
ADT - 2.3 hrs. = ART - 2.3 hrs.
Pump low-visl hi-vis sweep & circulate hole clean @ 5 B/M @ 2650 psi
- monitor well - static
Wiper trip fl 18,050' to 16,131' (20 jts.) wI pump - no rotary for first 5
stds. - pump wI rotary second 5 stds. - pump wI no rotart last 10 stds. -
hole took 50 bbls excess for fill - Pump rate 3.5 bbls/m @ 1970 psi
Begin to circulate bottoms up fl 16,131' - 4.6 B/M @ 2340 psi - hole
started taking fulid @ 160 B/H - slowed pump rate
RIH fl 16,131' to 17,946' - slow - no returns
Establish circulation - 2 B/M @ 1430 psi - circulating while getting brine
ready for change over - hole taking fluid @ 85 B/H
., had to pull brine fl upright tank & replace valve
.,., Decision made to pull to 7" shoe & then change over to brine - due to
losses & length of horizontal section
Flow check well - static - POOH wI pump @ 2 B/M - fl 18,042' to
13,600' - hole taking excess hole fill volume
.,., Lost 400 bbls to formation last 24 hrs. Total losses 1515 bbls
Continue to POOH wI pump fl 13,600' to 12,230' - Flow check well
static
PJSM - Change well over to 8.8 ppg brine - @ 12,242'
Monitor well - Clean up surface equipment
Observed slight flow from well - Circulate bottoms up - No gas
Observed slight flow from well - Circulate & weight up to 8.9 ppg
Monitor well - still flowing - Circulate & wt. up to 9.0 ppg- monitor well -
static - observed fluid level dropping slightly
Continue to POOH fl 12,230' to 9630'
Flow check - Pump dry job - Continue POOH - laying down excess 4"
drill pipe fl 9630' to 4400'
Slip & cut drill line - service Dwks - TO - blocks (momitor well on trip
tank -lost rate 1 B/H static)
Continue POOH - laying down excess 4" drill pipe fl 4400' to top of BHA
@ 383' - Flow check - static
Flush BHA wI fresh water - Std back HWDP & NM flex collars - LD
MWD, AGS, motor & bit
Printed: 2/24/2003 4:41 :50 PM
.)
ConocoPhillips Alaska
OperatIons Suml11aryReport,
Pull wear bushing
RU to run 41/2" tbg & completion equipment - PJSM
MU WLEG - 41/2" 12.6# L-80 pup jt. - XN nipple w/ RHC plug installed
- 2 jts. 4 1/2" 12.6# L-80 IBTM tbg - Baker S-3 packerl mill out ext.
assembly (all connections below packer BakerLoc ) 2 jts. 41/2" 12.6#
L-80 IBTM tbg - Camco GLM assembly (w/ dummy valve installed)
196 jts. 41/2" 12.6# L-80 IBTM tbg - Camco DB nipple-
49 jts. 4 1/2" 12.6# L-80 IBTM tbg - 10' x 41/2" 12.6# L-80 pup jt. - 1 jt.
41/2" 12.6# L-80 IBTM tbg - FMC tbg hanger w/2.27' pup jt. -landed
tbg in wellhead wI tail @ 11026.49' - XN nipple @ 11014' - Packer @
1 0907' -
GLM @ 10794' - Camco DB nipple @ 2235'
String wt. PU - 190 SO 120
RI LDS torque to 450 ft Ibs.
LD landing jt. A - set TWC - PU landing jt. B - RU & test tbg hanger
seals to 5000 psi for 10 mins. - RD test equipment - LD landing jt. B
ND BOPE stack - change TD saver sub to 41/2 IF
NU tree & test to 5000 psi - RD test equipment - RU FMC lubricator &
pull TWC
RU hard lines & squeeze manifold for freeze protect & packer setting
operations
PJSM - Test lines to 3000 psi - Pump 170 bbls 9.1 ppg KCL brine w/ rig
pumps - Switch to Dowell @ pump 200 bbls diesel for freeze protect
RU lubricator - drop packer setting rod/ball - Pressure tbg to 3500 psi to
set packer & test tbg for 30 mins. - bleed off tbg to 1500 psi into 41/2" x
7" annulus - test
annulus to 3500 psi for 30 mins. - bleed down annulus to 0 psi - & tbg to
600 psi - shut in well
1.50 CMPL TN RURD CMPL TN Clean out lines - RD hard lines & squeeze manifold -
Set BPV - secure well
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-08
CD2-08
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
Date From -To Hours Code Sub Phase
Code
2/8/2003 02:00 - 02:30 0.50 CMPL TN OTHR CMPL TN
02:30 - 03:00 0.50 CMPL TN RURD CMPL TN
03:00 - 12:30 9.50 CMPL TN RUNT CMPL TN
12:30 - 13:30 1.00 CMPL TN SEaT CMPL TN
13:30 - 14:30 1.00 CMPL TN NUND CMPL TN
14:30 - 16:00 1.50 CMPL TN NUND CMPL TN
16:00 - 17:30 1.50 CMPL TN OTHR CMPL TN
17:30 - 20:30 3.00 CMPL TN FRZP CMPL TN
20:30 - 22:30 2.00 CMPL TN PCKR CMPL TN
22:30 - 00:00
)
Page 7 of7
Start: 1/18/2003
Rig Release:
Rig Number:
Spud Date: 1/17/2003
End:
Group:
Description of Operations
Release Rig @ 2359 hrs.
Printed: 2/24/2003 4:41 :50 PM
Conocol-:. JiJSAlaSka, Inc. JD2-08 (Final Surveys)
MD Inc Azim. SSTVD TVD N/S EIW y X DLS V.S.
(Deg) (ft) (ft) (ft) (ft) (ft) (ft) e/1OOft) (ft)
0.00 0.00 0.00 -52.40 0.00 0.00 N 0.00 E 5974711.45 N 371688.72 E 0.00 0.00
82.00 0.00 0.00 29.60 82.00 0.00 N 0.00 E 5974711.45 N 371688.72 E 0.00 0.00
172.00 0.15 54.00 119.60 172.00 0.07 N 0.10 E 5974711.52 N 371688.82 E 0.17 0.02
258.00 2.40 45.00 205.57 257.97 1.41 N 1.46 E 5974712.83 N 371690.20 E 2.62 0.56
349.00 4.50 44.00 296.40 348.80 5.33 N 5.29 E 5974716.68 N 371694.10 E 2.31 2.21
377.06 4.61 44.58 324.37 376.77 6.92 N 6.84 E 5974718.25 N 371695.68 E 0.43 2.88
466.53 6.47 47.70 413.42 465.82 12.87 N 13.10 E 5974724.10 N 371702.04 E 2.11 5.19
556.08 6.81 50.60 502.37 554.77 19.64 N 20.93 E 5974730.73 N 371709.98 E 0.53 7.47
645.19 7.71 53.81 590.77 643.17 26.52 N 29.84 E 5974737.46 N 371719.01 E 1.11 9.34
734.19 7.86 57.47 678.95 731 .35 33.32 N 39.79 E 5974744.08 N 371729.07 E 0.58 10.65
823.78 8.36 59.76 767.64 820.04 39.89 N 50.58 E 5974750.47 N 371739.97 E 0.66 11.37
913.79 11.25 62.36 856.33 908.73 47.26 N 64.01 E 5974757.61 N 371753.53 E 3.25 11.54
1007.42 16.24 61.64 947.25 999.65 57.73 N 83.64 E 5974767.74 N 371773.33 E 5.33 11.53
1105.51 23.10 52.52 1039.58 1091.98 75.98 N 111.02 E 5974785.52 N 371801.02 E 7.64 14.73
1199.70 27.54 47.93 1124.71 1177.11 101.83 N 141 .86 E 5974810.83 N 371832.30 E 5.15 23.01
1294.02 27.28 47.61 1208.44 1260.84 131.01 N 174.01 E 5974839.46 N 371864.95 E 0.32 33.60
1389.56 29.06 47.62 1292.66 1345.06 161.41 N 207.33 E 5974869.29 N 371898.78 E 1.86 44.73
1485.28 31 .48 48.48 1375.32 1427.72 193.65 N 243.22 E 5974900.91 N 371935.21 E 2.57 56.27
1581.02 33.26 48.53 1456.18 1508.58 227.61 N 281.61 E 5974934.21 N 371974.18 E 1.86 68.14
1676.93 34.09 48.15 1536.00 1588.40 262.96 N 321.34 E 5974968.88 N 372014.51 E 0.89 80.61
1772.40 36.12 45.96 1614.10 1666.50 300.38 N 361.50 E 5975005.60 N 372055.31 E 2.50 94.70
1867.39 38.73 44.84 1689.53 1741.93 340.92 N 402.59 E 5975045.43 N 372097.08 E 2.84 111.11
1962.56 42.48 43.79 1761.78 1814.18 385.25 N 445.83 E 5975089.01 N 372141.08 E 4.01 129.84
2057.87 47.02 44.19 1829.45 1881.85 433.50 N 492.43 E 5975136.46 N 372188.50 E 4.77 150.46
2153.05 50.92 45.76 1891.92 1944.32 484.26 N 543.19 E 5975186.35 N 372240.12 E 4.28 171.33
2248.11 51.02 46.32 1951.78 2004.18 535.52 N 596.34 E 5975236.69 N 372294.14 E 0.47 191.51
2343.41 52.64 44.58 2010.67 2063.07 588.08 N 649.72 E 5975288.33 N 372348.41 E 2.23 212.74
2438.93 54.98 41.17 2067.08 2119.48 644.59 N 702.13 E 5975343.93 N 372401.78 E 3.78 237.89
2534.28 54.84 41.11 2121.90 2174.30 703.34 N 753.46 E 5975401.80 N 372454.11 E 0.16 265.55
2629.57 53.73 42.08 2177.52 2229.92 761.20 N 804.82 E 5975458.77 N 372506.45 E 1.43 292.40
2725.33 53.43 43.96 2234.38 2286.78 817.54 N 857.38 E 5975514.20 N 372559.97 E 1.61 317.33
2819.31 53.04 46.83 2290.64 2343.04 870.40 N 910.97 E 5975566.13 N 372614.45 E 2.48 338.72
2835.13 52.96 46.34 2300.16 2352.56 879.08 N 920.15 E 5975574.66 N 372623.78 E 2.53 342.06
2957.49 53.65 47.30 2373.27 2425.67 946.22 N 991.70 E 5975640.56 N 372696.46 E 0.85 367.58
3053.00 54.78 48.34 2429.12 2481 .52 998.23 N 1049.11 E 5975691 .59 N 372754.76 E 1.48 386.43
3148.40 56.04 47.75 2483.28 2535.68 1050.74 N 11 07.51 E 5975743.09 N 372814.05 E 1.42 405.24
3243.67 56.50 47.40 2536.18 2588.58 1104.19 N 1166.00 E 5975795.53 N 372873.44 E 0.57 424.84
3339.11 56.89 47.64 2588.59 2640.99 1158.06 N 1224.83 E 5975848.38 N 372933.18 E 0.46 444.65
3434.46 55.29 48.46 2641.78 2694.18 1210.96 N 1283.67 E 5975900.27 N 372992.93 E 1.82 463.60
3529.94 59.43 44.13 2693.29 2745.69 1266.53 N 1341.71 E 5975954.84 N 373051.91 E 5.78 485.28
3625.90 60.11 39.97 2741.61 2794.01 1328.08 N 1397.22 E 5976015.43 N 373108.46 E 3.81 513.43
3720.62 57.74 39.81 2790.50 2842.90 1390.33 N 1449.24 E 5976076.77 N 373161.54 E 2.51 543.83
3816.07 55.59 41.22 2842.95 2895.35 1450.95 N 1501.04 E 5976136.50 N 373214.37 E 2.57 572.92
3911.45 53.56 42.06 2898.24 2950.64 1509.04 N 1552.67 E 5976193.70 N 373266.99 E 2.25 599.84
4006.78 53.78 42.33 2954.71 3007.11 1565.94 N 1604.25 E 5976249.70 N 373319.54 E 0.33 625.73
4100.99 54.25 42.56 3010.07 3062.47 1622.19 N 1655.70 E 5976305.07 N 373371.94 E 0.54 651 .12
4198.02 55.08 44.05 3066.19 3118.59 1679.79 N 1709.99 E 5976361.73 N 373427.21 E 1.52 676.36
4293.43 54.84 44.76 3120.97 3173.37 1735.59 N 1764.65 E 5976416.59 N 373482.81 E 0.66 699.84
4388.75 55.52 44.99 3175.40 3227.80 1791.05 N 1819.86 E 5976471.09 N 373538.97 E 0.74 722.75
4484.57 56.52 45.25 3228.95 3281.35 1847.11 N 1876.17 E 5976526.19 N 373596.22 E 1.07 745.69
4580.01 57.58 45.47 3280.86 3333.26 1903.38 N 1933.15 E 5976581.47 N 373654.16 E 1.13 768.49
4675.79 58.98 46.19 3331 .22 3383.62 1960.15 N 1991.59 E 5976637.23 N 373713.56 E 1.60 791.04
4771.38 60.27 45.86 3379.55 3431.95 2017.41 N 2050.94 E 5976693.47 N 373773.88 E 1.38 813.60
4866.65 61.84 43.92 3425.66 3478.06 2076.48 N 2109.76 E 5976751.52 N 373833.71 E 2.43 837.99
4961.99 59.71 38.28 3472.24 3524.64 2139.11 N 2164.45 E 5976813.20 N 373889.46 E 5.62 867.48
5057.65 54.41 37.31 3524.23 3576.63 2202.51 N 2213.65 E 5976875.76 N 373939.74 E 5.61 900.24
5152.91 55.66 36.81 3578.82 3631 .22 2264.81 N 2260.69 E 5976937.24 N 373987.84 E 1.38 933.03
5248.48 52.35 42.56 3635.02 3687.42 2324.31 N 2309.97 E 5976995.89 N 374038.12 E 5.97 962.32
5344.61 51.20 50.68 3694.56 3746.96 2376.13 N 2364.74 E 5977046.77 N 374093.78 E 6.74 982.23
5439.68 56.62 58.84 3750.60 3803.00 2420.23 N 2427.48 E 5977089.78 N 374157.26 E 8.97 991.57
5534.99 59.18 56.14 3801.25 3853.65 2463.63 N 2495.54 E 5977132.02 N 374226.05 E 3.60 997.81
5630.68 60.66 53.58 3849.21 3901.61 2511 .30 N 2563.24 E 5977178.52 N 374294.55 E 2.78 1 007.97
5725.98 60.84 53.41 3895.78 3948.18 2560.76 N 2630.07 E 5977226.83 N 374362.23 E 0.25 1020.12
5821.58 60.21 50.26 3942.83 3995.23 2612.17 N 2695.50 E 5977277.12 N 374428.52 E 2.94 1034.66
5917.04 59.00 46.22 3991.14 4043.54 2666.98 N 2756.91 E 5977330.86 N 374490.87 E 3.86 1054.08
conocohJiPS Alaska, Inc. JD2-08(Final Surveys)
Azim. SSTVD TVD N/S E/W V X DLS v.s.
(ft) (Deg) (Deg) (ft) (ft) (ft) (ft) e/100ft) (ft)
6012.33 59.35 44.25 4039.97 4092.37 2724.60 N 2815.00 E 5977387.48 374549.94 1.81 1077.55
6107.92 57.68 42.04 4089.90 4142.30 2784.06 N 2870.75 E 5977445.98 N 374606.69 E 2.63 1103.74
6203.51 57.08 42.16 4141.43 4193.83 2843.80 N 2924.73 E 5977504.79 N 374661.68 E 0.64 1131.01
6298.87 57.53 42.21 4192.94 4245.34 2903.27 N 2978.62 E 5977563.32 N 374716.58 E 0.47 1158.08
6394.24 58.39 42.42 4243.53 4295.93 2963.04 N 3033.04 E 5977622.16 N 374772.02 E 0.92 1185.18
6489.78 57.79 41.97 4294.03 4346.43 3023.13 N 3087.52 E 5977681.30 N 374827.52 E 0.74 1212.53
6585.39 56.93 41.81 4345.60 4398.00 3083.06 N 3141.27 E 5977740.31 N 374882.29 E 0.91 1240.08
6680.75 56.58 42.86 4397.88 4450.28 3142.02 N 3194.98 E 5977798.33 N 374937.00 E 0.99 1266.78
6776.24 55.92 42.52 4450.93 4503.33 3200.37 N 3248.81 E 5977855.76 N 374991.83 E 0.75 1292.91
6871.55 56.49 42.15 4503.95 4556.35 3258.93 N 3302.16 E 5977913.39 N 375046.16 E 0.68 1319.43
6967.44 56.43 41.73 4556.93 4609.33 3318.38 N 3355.57 E 5977971.92 N 375100.59 E 0.37 1346.71
7062.58 55.91 41.39 4609.89 4662.29 3377.51 N 3408.00 E 5978030.15 N 375154.02 E 0.62 1374.18
7158.17 56.35 41.76 4663.17 4715.57 3436.89 N 3460.67 E 5978088.61 N 375207.70 E 0.56 1401.75
7253.42 56.94 41.17 4715.54 4767.94 3496.51 N 3513.35 E 5978147.32 N 375261.39 E 0.81 1429.53
7349.09 57.17 41.19 4767.57 4819.97 3556.93 N 3566.22 E 5978206.84 N 375315.28 E 0.24 1457.94
7444.29 55.96 40.85 4820.02 4872.42 3616.87 N 3618.36 E 5978265.87 N 375368.44 E 1.31 1486.25
7540.03 55.24 41.06 4874.11 4926.51 3676.53 N 3670.14 E 5978324.64 N 375421.23 E 0.77 1514.49
7635.25 55.66 40.76 4928.11 4980.51 3735.80 N 3721.49 E 5978383.02 N 375473.60 E 0.51 1542.58
7730.24 55.99 41.18 4981.47 5033.87 3795.14 N 3773.02 E 5978441.47 N 375526.13 E 0.50 1570.65
7825.98 56.42 42.36 5034.72 5087.12 3854.47 N 3826.02 E 5978499.89 N 375580.14 E 1.12 1598.03
7921.20 56.73 42.52 5087.18 5139.58 3913.12 N 3879.65 E 5978557.61 N 375634.77 E 0.35 1624.51
8016.71 57.23 43.81 5139.22 5191.62 3971.53 N 3934.44 E 5978615.07 N 375690.54 E 1.25 1650.23
8111.98 57.76 43.23 5190.42 5242.82 4029.79 N 3989.76 E 5978672.38 N 375746.86 E 0.76 1675.56
8207.34 57.89 43.78 5241.20 5293.60 4088.34 N 4045.33 E 5978729.96 N 375803.42 E 0.51 1701.03
8303.06 57.52 43.63 5292.34 5344.74 4146.83 N 4101.23 E 5978787.49 N 375860.31 E 0.41 1726.30
8398.74 58.27 45.88 5343.20 5395.60 4204.37 N 4158.30 E 5978844.05 N 375918.35 E 2.14 1750.18
8493.94 58.11 45.82 5393.38 5445.78 4260.72 N 4216.34 E 5978899.40 N 375977.36 E 0.18 1772.55
8589.39 56.88 44.99 5444.67 5497.07 4317.23 N 4273.67 E 5978954.92 N 376035.64 E 1.48 1795.40
8685.27 55.76 45.02 5497.84 5550.24 4373.64 N 4330.09 E 5979010.36 N 376093.02 E 1.17 1818.59
8780.76 55.41 45.50 5551.81 5604.21 4429.09 N 4386.04 E 5979064.84 N 376149.91 E 0.55 1841.15
8876.16 53.72 46.30 5607.12 5659.52 4483.19 N 4441 .85 E 5979117.97 N 376206.64 E 1.90 1862.58
8971.68 55.67 46.16 5662.32 5714.72 4537.11 N 4498.14 E 5979170.92 N 376263.84 E 2.05 1883.63
9067.46 57.83 44.96 5714.83 5767.23 4593.20 N 4555.32 E 5979226.02 N 376321.97 E 2.49 1906.17
9162.90 59.40 44.18 5764.53 5816.93 4651.24 N 4612.49 E 5979283.08 N 376380.13 E 1.79 1930.45
9258.30 59.71 44.14 5812.87 5865.27 4710.24 N 4669.79 E 5979341.09 N 376438.43 E 0.33 1955.51
9353.55 59.18 43.87 5861 .30 5913.70 4769.24 N 4726.77 E 5979399.11 N 376496.41 E 0.61 1980.71
9448.72 58.99 43.78 5910.19 5962.59 4828.15 N 4783.31 E 5979457.04 N 376553.95 E 0.22 2006.04
9544.26 58.05 43.39 5960.08 6012.48 4887.17 N 4839.49 E 5979515.08 N 376611 .13 E 1.04 2031.64
9639.79 55.90 42.78 6012.14 6064.54 4945.65 N 4894.20 E 5979572.63 N 376666.83 E 2.31 2057.47
9735.35 55.68 42.66 6065.87 6118.27 5003.71 N 4947.81 E 5979629.76 N 376721.43 E 0.25 2083.43
9830.92 56.72 43.29 6119.04 6171.44 5061.82 N 5001.95 E 5979686.93 N 376776.56 E 1.22 2109.19
9926.50 57.90 43.76 6170.66 6223.06 5120.14 N 5057.35 E 5979744.30 N 376832.94 E 1.30 2134.54
10022.22 57.90 44.65 6221 .52 6273.92 5178.26 N 5113.88 E 5979801.45 N 376890.46 E 0.79 2159.19
10117.51 57.55 44.45 6272.41 6324.81 5235.68 N 5170.40 E 5979857.89 N 376947.96 E 0.41 2183.21
10213.15 56.36 44.15 6324.56 6376.96 5293.05 N 5226.39 E 5979914.29 N 377004.92 E 1.27 2207.45
10308.92 55.97 43.69 6377.88 6430.28 5350.35 N 5281.57 E 5979970.64 N 377061.08 E 0.57 2232.01
10404.17 55.54 42.84 6431.48 6483.88 5407.69 N 5335.54 E 5980027.04 N 377116.02 E 0.87 2257.17
1 0499.39 56.27 40.02 6484.87 6537.27 5466.80 N 5387.70 E 5980085.26 N 377169.18 E 2.57 2284.74
10595.54 59.41 36.18 6536.05 6588.45 5530.86 N 5437.87 E 5980148.45 N 377220.44 E 4.70 2317.62
10688.01 61.84 30.48 6581 .44 6633.84 5598.17 N 5482.07 E 5980214.99 N 377265.79 E 5.98 2356.17
10785.62 61.64 25.22 6627.68 6680.08 5674.15 N 5522.22 E 5980290.27 N 377307.23 E 4.75 2404.28
10881.54 63.07 21.11 6672.20 6724.60 5752.25 N 5555.62. E 5980367.78 N 377341.96 E 4.08 2457.45
10976.46 64.94 18.73 6713.80 6766.20 5832.45 N 5584.67 E 5980447.48 N 377372.38 E 2.99 2514.52
11072.61 66.36 16.66 6753.45 6805.85 5915.90 N 5611.28 E 5980530.46 N 377400.41 E 2.46 2575.59
11168.05 67.52 12.73 6790.85 6843.25 6000.82 N 5633.54 E 5980614.99 N 377424.12 E 3.98 2640.02
11263.64 68.98 9.52 6826.27 6878.67 6087.92 N 5650.65 E 5980701.79 N 377442.73 E 3.47 2708.80
11359.06 70.17 5.16 6859.59 6911.99 6176.58 N 5662.06 E 5980790.24 N 377455.65 E 4.46 2781.63
11454.56 73.54 0.49 6889.34 6941.74 6267.18 N 5666.50 E 5980880.75 N 377461.63 E 5.83 2859.46
11549.86 77.12 356.70 6913.48 6965.88 6359.31 N 5664.21 E 5980972.91 N 377460.93 E 5.38 2941.81
11643.64 78.69 353.30 6933.13 6985.53 6450.65 N 5656.21 E 5981 064.36 N 377454.49 E 3.92 3026.14
11740.74 79.45 349.99 6951 .55 7003.95 6544.96 N 5642.36 E 5981158.89 N 377442.25 E 3.44 3115.87
11836.29 82.45 347.98 6966.58 7018.98 6637.56 N 5624.33 E 5981251.79 N 377425.81 E 3.77 3206.05
11932.08 86.11 345.12 6976.13 7028.53 6730.23 N 5602.15 E 5981344.83 N 377405.22 E 4.84 3298.24
12027.58 86.48 342.17 6982.30 7034.70 6821.67 N 5575.32 E 5981436.71 N 377379.96 E 3.11 3391.53
12123.18 86.60 337.62 6988.07 7040.47 6911.25 N 5542.53 E 5981526.85 N 377348.71 E 4.75 3486.01
CanacoF'. .')¡PS Alaska, Inc. )D2-08 (Final Surveys)
SSTVD TVD N/S E/W V X DLS v.s.
(ft) (Deg) e/100ft) (ft)
12182.77 86.36 334.98 6991.73 7044.13 6965.71 N 5518.62 E 5981581.70 377325.74 E 4.44 3545.30
12290.93 88.21 331.75 6996.85 7049.25 7062.27 N 5470.20 E 5981679.07 N 377278.97 E 3.44 3653.29
12330.77 88.28 331.55 6998.07 7050.47 7097.31 N 5451.29 E 5981714.44 N 377260.66 E 0.53 3693.11
12426.18 89.88 331.65 6999.61 7052.01 7181.23 N 5405.91 E 5981799.12 N 377216.73 E 1.68 3788.50
12521.79 90.12 330.67 6999.61 7052.01 7264.98 N 5359.80 E 5981883.64 N 377172.05 E 1.06 3884.1 0
12617.37 90.37 330.69 6999.20 7051.60 7348.31 N 5312.99 E 5981967.77 N 377126.68 E 0.26 3979.66
12712.95 90.92 330.83 6998.12 7050.52 7431.71 N 5266.31 E 5982051 .95 N 377081.43 E 0.59 4075.22
12808.17 89.63 331 .18 6997.67 7050.07 7514.99 N 5220.15 E 5982136.01 N 377036.71 E 1.40 4170.42
12904.05 89.45 330.83 6998.43 7050.83 7598.85 N 5173.68 E 5982220.65 N 376991.68 E 0.41 4266.29
12999.62 89.32 330.90 6999.46 7051.86 7682.32 N 5127.15 E 5982304.91 N 376946.58 E 0.15 4361.83
13094.80 91.66 329.84 6998.65 7051.05 7765.05 N 5080.10 E 5982388.43 N 376900.95 E 2.70 4456.97
13190.43 92.03 330.08 6995.57 7047.97 7847.79 N 5032.25 E 5982471.98 N 376854.53 E 0.46 4552.49
13282.49 92.28 330.28 6992.11 7044.51 7927.60 N 4986.51 E 5982552.56 N 376810.16 E 0.35 4644.45
13381.62 92.71 329.44 6987.79 7040.19 8013.25 N 4936.78 E 5982639.04 N 376761.90 E 0.95 4743.42
13474.03 92.71 329.47 6983.42 7035.82 8092.74 N 4889.87 E 5982719.33 N 376716.36 E 0.03 4835.64
13571.88 91.97 330.60 6979.43 7031.83 8177.44 N 4841.04 E 5982804.85 N 376668.98 E 1.38 4933.36
13668.71 91.66 330.28 6976.36 7028.76 8261.63 N 4793.29 E 5982889.84 N 376622.68 E 0.46 5030.11
13762.76 91.66 330.62 6973.63 7026.03 8343.41 N 4746.93 E 5982972.41 N 376577.73 E 0.36 5124.09
13856.62 90.80 331.98 6971.62 7024.02 8425.72 N 4701.86 E 5983055.47 N 376534.08 E 1.71 5217.92
13951.21 89.88 332.26 6971.06 7023.46 8509.32 N 4657.63 E 5983139.83 N 376491.29 E 1.02 5312.50
14049.92 89.82 332.80 6971.32 7023.72 8596.90 N 4612.10 E 5983228.17 N 376447.26 E 0.55 5411.21
14145.61 90.12 331.93 6971.37 7023.77 8681.68 N 4567.72 E 5983313.69 N 376404.33 E 0.96 5506.89
14241.02 91.05 331.88 6970.39 7022.79 8765.84 N 4522.79 E 5983398.61 N 376360.85 E 0.98 5602.30
14335.70 90.37 332.61 6969.22 7021.62 8849.62 N 4478.70 E 5983483.13 N 376318.20 E 1.05 5696.97
14431.27 90.80 331.81 6968.24 7020.64 8934.16 N 4434.14 E 5983568.42 N 376275.10 E 0.95 5792.53
14527.02 88.83 333.61 6968.55 7020.95 9019.25 N 4390.25 E 5983654.25 N 376232.67 E 2.79 5888.26
14622.91 87.66 333.17 6971.49 7023.89 9104.94 N 4347.32 E 5983740.66 N 376191.21 E 1.30 5984.07
14718.42 87.60 333.96 6975.44 7027.84 9190.39 N 4304.84 E 5983826.82 N 376150.19 E 0.83 6079.46
14814.27 87.85 333.49 6979.24 7031.64 9276.27 N 4262.44 E 5983913.42 N 376109.27 E 0.56 6175.18
14906.63 89.14 332.96 6981.67 7034.07 9358.69 N 4220.85 E 5983996.54 N 376069.10 E 1.51 6267.48
15001.66 89.63 332.65 6982.69 7035.09 9443.21 N 4177.42 E 5984081.79 N 376027.12 E 0.61 6362.50
15100.15 91.41 332.65 6981 .80 7034.20 9530.69 N 4132.17 E 5984170.03 N 375983.38 E 1.81 6460.97
15193.71 91.48 332.42 6979.44 7031 .84 9613.67 N 4089.04 E 5984253.74 N 375941.67 E 0.26 6554.50
15291.15 91.48 332.23 6976.92 7029.32 9699.94 N 4043.80 E 5984340.77 N 375897.91 E 0.20 6651.90
15386.59 91.60 332.93 6974.36 7026.76 9784.62 N 3999.86 E 5984426.19 N 375855.43 E 0.74 6747.30
15482.13 91.23 332.90 6972.00 7024.40 9869.66 N 3956.37 E 5984511.96 N 375813.41 E 0.39 6842.79
15577.59 91.35 333.06 6969.85 7022.25 9954.68 N 3913.02 E 5984597.71 N 375771.51 E 0.21 6938.21
15673.19 90.98 332.77 6967.90 7020.30 10039.78 N 3869.50 E 5984683.54 N 375729.46 E 0.49 7033.78
15768.39 89.82 331.99 6967.24 7019.64 10124.12 N 3825.36 E 5984768.63 N 375686.77 E 1.47 7128.97
15863.61 90.31 332.35 6967.13 7019.53 10208.33 N 3780.91 E 5984853.58 N 375643.77 E 0.64 7224.19
15958.97 89.38 331.82 6967.39 7019.79 10292.59 N 3736.27 E 5984938.60 N 375600.57 E 1.12 7319.55
16052.83 89.88 331 .4 1 6967.99 7020.39 10375.17 N 3691.65 E 5985021.92 N 375557.37 E 0.69 7413.40
16147.08 90.43 331.47 6967.74 7020.14 10457.95 N 3646.59 E 5985105.46 N 375513.74 E 0.59 7507.65
16245.83 90.00 331.62 6967.37 7019.77 10544.77 N 3599.54 E 5985193.08 N 375468.18 E 0.46 7606.40
16340.80 90.12 330.92 6967.27 7019.67 10628.04 N 3553.89 E 5985277.12 N 375423.96 E 0.75 7701.36
16436.16 90.86 330.65 6966.45 7018.85 10711.27 N 3507.35 E 5985361.13 N 375378.85 E 0.83 7796.70
16531.84 92.03 330.38 6964.04 7016.44 1 0794.53 N 3460.27 E 5985445.19 N 375333.20 E 1.26 7892.32
16625.28 92.83 329.90 6960.08 7012.48 10875.49 N 3413.79 E 5985526.93 N 375288.12 E 1.00 7985.63
16720.00 91.23 329.89 6956.72 7009.12 1 0957.38 N 3366.31 E 5985609.62 N 375242.05 E 1.69 8080.23
16818.62 90.80 330.26 6954.98 7007.38 11042.84 N 3317.12 E 5985695.91 N 375194.33 E 0.58 8178.78
16913.88 88.59 329.51 6955.48 7007.88 11125.23 N 3269.33 E 5985779.11 N 375147.95 E 2.45 8273.97
17009.55 88.89 329.74 6957.59 7009.99 11207.75 N 3220.97 E 5985862.44 N 375101.01 E 0.40 8369.55
17104.83 89.02 330.08 6959.33 7011.73 11290.18 N 3173.20 E 5985945.67 N 375054.66 E 0.38 8464.75
17200.18 89.57 330.07 6960.50 7012.90 11372.81 N 3125.64 E 5986029.11 N 375008.52 E 0.58 8560.05
17296.01 89.88 329.51 6960.96 7013.36 11455.62 N 3077.42 E 5986112.73 N 374961.73 E 0.67 8655.81
17391.60 90.62 329.51 6960.54 7012.94 11537.99 N 3028.92 E 5986195.92 N 374914.64 E 0.77 8751.32
17486.67 91.11 329.39 6959.11 7011.51 11619.86 N 2980.61 E 5986278.60 N 374867.73 E 0.53 8846.29
17581.96 91.54 328.40 6956.90 7009.30 11701.42 N 2931.39 E 5986361.00 N 374819.92 E 1.13 8941 .42
17677.90 87.85 329.71 6957.41 7009.81 11783.69 N 2882.07 E 5986444.09 N 374772.01 E 4.08 9037.22
17773.79 86.71 329.51 6961 .96 7014.36 11866.31 N 2833.61 E 5986527.53 N 374724.98 E 1.21 9132.92
17869.51 87.47 329.39 6966.82 7019.22 11948.64 N 2785.02 E 5986610.68 N 374677.81 E 0.80 9228.43
17964.66 88.69 329.11 6970.01 7022.41 12030.36 N 2736.40 E 5986693.22 N 374630.59 E 1.32 9323.43
18050.00 88.69 329.11 6971.96 7024.36 12103.58 N 2692.60 E 5986767.18 N 374588.05 E 0.00 9408.64
)
)
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well CD2-0B GYRO
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD (if applicable)
0.00 I MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
C53oa-d5 ()
1B-Apr-03
~-;- r= r'it E'VED
~~. Ik.-. L; I
APR 22 2003
<\í:¡SKa \.ii'1 &. ;;;ê;1S Cons. Commililn
Anchorage
('
GY
~
I
gs
C(J
Sperry-Sun Drilling Services
""----
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2-0B Gyro
Job No. AKF030009, Surveyed: 6 February, 2003
Survey Report
16 April, 2003
r-,
Your Ref: API 501032044200
Surface Coordinates: 5974711.45 N, 371688.72 E (70020' 20.9101" N, 151002' 28.3374" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 974711.45 N, 128311.28 W (Grid)
Surface Coordinates relative to Structure: 268.01 N, 33.36 W (True)
Kelly Bushing: 52. 40ft above Mean Sea Level
Elevation relative to Project V Reference: 52.40ft
Elevation relative to Structure: 52.40ft
5pe..........y-!5ur-,
DRILLING seRVices
A Halliburton Company
)EF-N - VE
Survey Ref: 5vy230
f
Alaska North Slope
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
0.00 0.000 0.000 -52.40 0.00
82.00 0.000 0.000 29.60 82.00
172.00 0.150 54.000 119.60 172.00
258.00 2.400 45.000 205.57 257.97
F-~ 349.00 4.500 44.000 296.40 348.80
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-0B Gyro
Your Ref: API 501032044200
Job No. AKF030009, Surveyed: 6 February, 2003
Local Coordinates
Northings Eastings
(ft) (ft)
0.00 N
0.00 N
0.07 N
1.41 N
5.32 N
0.00 E
0.00 E
0.10 E
1 .46 E
5.29 E
Global Coordinates
Northings Eastings
(ft) (ft)
5974711.45 N
5974711.45 N
5974711.52 N
5974712.83 N
5974716.68 N
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 52.4' MSL. Northings and Eastings are relative to 1646' FNL, 1554' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from 1646' FNL, 1554' FEL and calculated along an Azimuth of 331.900° (True).
Magnetic Dedination at Surface is 24.715°(17-Jan-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 349.00ft.,
The Bottom Hole Displacement is 7.50ft., in the Direction of 44.799° (True).
Survey tool program for CD2-0B Gvro
~"
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
349.00
348.80 Tolerable Gyro
0.00
16 April, 2003 - 9:31
Page 2 of2
371688.72 E
371688.72 E
371688.82 E
371690.20 E
371694.10 E
Dogleg Vertical
Rate Section
(0/100ft)
0.000
0.167
2.619
2.309
North Slope, A/aska
Comment
0.00 Tolerable Gyro
0.00
0.02
0.56
2.21
DrillQuest 3.03.02.005
)
)
aoa-d5ð
18-Apr-03
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well CD2-08
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
18,050.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECEIV'ED
Attachment(s)
APR 2 2 2003
A1amæ orJ & Gas Cons. Commi5síon
Anchorage
CD
ìi)
~
G
<1J
Sperry-Sun Drilling Services
, ..-..
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2-0B
Job No. AKZZ30009, Surveyed: 6 February, 2003
Survey Report
16 April, 2003
,.-..,
Your Ref: API 501032044200
Surface Coordinates: 5974711.45 N, 371688.72 E (70020' 20.9101" N, 151002' 28.3374" W)
Grid Coordinate System: HAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 974711.45 H, 128311.28 W (Grid)
Surface Coordinates relative to Structure: 268.01 H, 33.36 W (True)
Kelly Bushing: 52.4Oft above Mean Sea Level
Elevation relative to Project V Reference: 52.40ft
Elevation relative to Structure: 52.40ft
sper'r'Y-5U'"
DRILLING seRVices
A Halliburton Company
)-
.... ~ .
.... -
\. - VE
Survey Ref: svy232
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-0B
Your Ref: API 501032044200
Job No. AKZZ30009, Surveyed: 6 February, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) r/100ft)
349.00 4.500 44.000 296.40 348.80 5.32 N 529 E 5974716.68 N 371694.10 E 2.21 AK-6 BPJFR-AK
377.06 4.610 44.580 324.37 376.77 6.92 N 6.84E 5974718.25 N 371695.68 E 0.425 2.88
466.53 6.4 70 47.700 413.42 465.82 12.87 N 13.10 E 5974724.10 N 371702.03 E 2.105 5.19
556.08 6.810 50.600 502.37 554.77 19.64 N 20.93 E 5974730.73 N 371709.98 E 0.533 7.47
1'-- 645.19 7.710 53.810 590.77 643.17 26.52 N 29.84 E 5974737.46 N 371719.01 E 1.107 9.34
734.19 7.860 57.470 678.95 731.35 33.32 N 39.79 E 5974744.08 N 371729.07 E 0.582 10.65
823.78 8.360 59.760 767.64 820.04 39.89 N 50.58 E 5974750.47 N 371739.97 E 0.664 11.37
913.79 11.250 62.360 856.33 908.73 47.26 N 64.01 E 5974757.61 N 371753.53 E 3.247 11.54
1 007.42 16.240 61.640 947.25 999.65 57.73 N 83.64 E 5974767.74 N 371773.33 E 5.333 11.53
1105.51 23.100 52.520 1039.58 1091.98 75.98 N 111.02 E 5974785.52 N 371801.02 E 7.642 14.73
1199.70 27.540 47.930 1124.71 1177.11 101.83 N 141.86E 5974810.83 N 371832.30 E 5.151 23.00
1294.02 27.280 47.610 1208.44 1260.84 131.01 N 174.01 E 5974839.46 N 371864.95 E 0.317 33.60
1389.56 29.060 47.620 1292.66 1345.06 161.41 N 207.33 E 5974869.29 N 371898.78 E 1.863 44.73
1485.28 31.480 48.480 1375.32 1427.72 193.65 N 243.22 E 5974900.91 N 371935.21 E 2.568 56.27
1581.02 33.260 48.530 1456.18 1508.58 227.61 N 281.61 E 5974934.21 N 371974.18 E 1.859 68.14
1676.93 34.090 48.150 1536.00 1588.40 262.96 N 321.34 E 5974968.88 N 372014.51 E 0.893 80.61
1772.40 36.120 45.960 1614.10 1666.50 300.38 N 361.50 E 5975005.60 N 372055.31 E 2.502 94.70
1867.39 38.730 44.840 1689.53 1741.93 340.92 N 402.59 E 5975045.43 N 372097.08 E 2.839 111.11
1962.56 42.480 43.790 1761.77 1814.17 385.25 N 445.83 E 5975089.01 N 372141.08 E 4.005 129.84
2057.87 47.020 44.190 1829.44 1881.84 433.50 N 492.43 E 5975136.46 N 372188.50 E 4.773 150.46
2153.05 50.920 45.760 1891.92 1944.32 484.26 N 543.19 E 5975186.34 N 372240.11 E 4.282 171.33
r~ 2248.11 51.020 46.320 1951.78 2004.18 535.52 N 596.34 E 5975236.69 N 372294.14 E 0.470 191.51
2343.41 52.640 44.580 2010.67 2063.07 588.08 N 649.72 E 5975288.33 N 372348.41 E 2.225 212.74
2438.93 54.980 41.170 2067.08 2119.48 644.58 N 702.13 E 5975343.93 N 372401.78 E 3.781 237.89
2534.28 54.840 41.110 2121.90 2174.30 703.34 N 753.46 E 5975401.80 N 372454.11 E 0.156 265.55
2629.57 53.730 42.080 2177.52 2229.92 761.20 N 804.82 E 5975458.77 N 372506.45 E 1 .428 292.40
2725.33 53.430 43.960 2234.38 2286.78 817.54 N 857.38 E 5975514.20 N 372559.97 E 1.611 317.33
2819.31 53.040 46.830 2290.64 2343.04 870.40 N 910.97 E 5975566.13 N 372614.45 E 2.481 338.72
2835.13 52.960 46.340 2300.16 2352.56 879.08 N 920.15 E 5975574.66 N 372623.78 E 2.525 342.06
2957.49 53.650 47.300 2373.27 2425.67 946.22 N 991.69 E 5975640.56 N 372696.46 E 0.845 367.58
3053.00 54.780 48.340 2429.12 2481.52 998.23 N 1049.11 E 5975691.59 N 372754.76 E 1 .476 386.43
3148.40 56.040 47.750 2483.28 2535.68 1050.74 N 1107.51 E 5975743.08 N 372814.05 E 1.415 405.23
3243.67 56.500 47.400 2536.18 2588.58 1104.19N 1166.00 E 5975795.53 N 372873.44 E 0.571 424.84
3339.11 56.890 47.640 2588.59 2640.99 1158.06 N 1224.83 E 5975848.38 N 372933.18 E 0.460 444.65
3434.46 55.290 48.460 2641.78 2694.18 1210.96 N 1283.67 E 5975900.27 N 372992.93 E 1.823 463.60
-------------.-------
16 April, 2003 - 9:29 Page 20fB DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-OB
Your Ref: API 501032044200
Job No. AKZZ30009, Surveyed: 6 February, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) r/100ft)
3529.94 59.430 44.130 2693.29 2745.69 1266.53 N 1341.71 E 5975954.84 N 373051.91 E 5.776 485.28
3625.90 60.110 39.970 2741.61 2794.01 1328.08 N 1397.22 E 5976015.43 N 373108.46 E 3.812 513.43
3720.62 57.740 39.810 2790.50 2842.90 1390.33 N 1449.24 E 5976076.77 N 373161.54 E 2.506 543.83
3816.07 55.590 41.220 2842.95 2895.35 1450.95 N 1501.04 E 5976136.50 N 373214.37 E 2.568 572.92
-.. 3911.45 53.560 42.060 2898.24 2950.64 1509.04 N 1552.67 E 5976193.70 N 373266.99 E 2.246 599.84
4006.78 53.780 42.330 2954.71 3007.11 1565.94 N 1604.25 E 5976249.70 N 373319.53 E 0.325 625.73
4100.99 54.250 42.560 3010.07 3062.4 7 1622.19 N 1655.70 E 5976305.07 N 373371.94 E 0.537 651.12
4198.02 55.080 44.050 3066.19 3118.59 1679.78 N 1709.99 E 5976361.73 N 373427.21 E 1.517 676.36
4293.43 54.840 44.760 3120.97 3173.37 1735.59 N 1764.65 E 5976416.59 N 373482.81 E 0.659 699.84
4388.75 55.520 44.990 3175.40 3227.80 1791.05 N 1819.86 E 5976471.09 N 373538.97 E 0.740 722.75
4484.57 56.520 45.250 3228.95 3281.35 1847.11 N 1876.17 E 5976526.18 N 373596.22 E 1.068 745.69
4580.01 57.580 45.470 3280.86 3333.26 1903.38 N 1933.15 E 5976581.4 7 N 373654.16 E 1.127 768.49
4675.79 58.980 46.190 3331.22 3383.62 1960.15 N 1991.59 E 5976637.23 N 373713.56 E 1.595 791.04
4771.38 60.270 45.860 3379.55 3431.95 2017.41 N 2050.94 E 5976693.47 N 373773.88 E 1.382 813.60
4866.65 61.840 43.920 3425.66 3478.06 2076.48 N 2109.76 E 5976751.52 N 373833.71 E 2.427 837.99
4961.99 59.710 38.280 3472.24 3524.64 2139.11 N 2164.45 E 5976813.20 N 373889.46 E 5.624 867.48
5057.65 54.410 37.310 3524.23 3576.63 2202.51 N 2213.65 E 5976875.76 N 373939.74 E 5.605 900.24
5152.91 55.660 36.810 3578.82 3631 .22 2264.81 N 2260.69 E 5976937.24 N 373987.84 E 1.381 933.03
5248.48 52.350 42.560 3635.02 3687.42 2324.31 N 2309.96 E 5976995.89 N 374038.12 E 5.972 962.32
5344.61 51.200 50.680 3694.56 3746.96 2376.13 N 2364.74 E 5977046.77 N 374093.78 E 6.740 982.23
5439.68 56.620 58.840 3750.60 3803.00 2420.23 N 2427.48 E 5977089.78 N 374157.26 E 8.972 991.57
,'-'" 5534.99 59.180 56.140 3801.25 3853.65 2463.63 N 2495.54 E 5977132.02 N 374226.05 E 3.602 997.81
5630.68 60.660 53.580 3849.21 3901.61 2511.30 N 2563.23 E 5977178.52 N 374294.55 E 2.784 1007.97
5725.98 60.840 53.410 3895.78 3948.18 2560.76 N 2630.07 E 5977226.83 N 374362.23 E 0.245 1020.12
5821.58 60.210 50.260 3942.83 3995.23 2612.17 N 2695.50 E 5977277.12 N 374428.52 E 2.943 1034.66
5917.04 59.000 46.220 3991.14 4043.54 2666.98 N 2756.91 E 5977330.86 N 374490.86 E 3.864 1054.08
6012.33 59.350 44.250 4039.97 4092.37 2724.60 N 2815.00 E 5977387.48 N 374549.93 E 1.813 1077.55
6107.92 57.680 42.040 4089.90 4142.30 2784.06 N 2870.75 E 5977445.98 N 374606.69 E 2.634 1103.74
6203.51 57.080 42.160 4141.43 4193.83 2843.80 N 2924.73 E 5977504.79 N 374661.68 E 0.637 1131.01
6298.87 57.530 42.210 4192.94 4245.34 2903.27 N 2978.62 E 5977563.32 N 374716.58 E 0.474 1158.08
6394.24 58.390 42.420 4243.53 4295.93 2963.04 N 3033.04 E 5977622.16 N 374772.02 E 0.921 1185.18
6489.78 57.790 41.970 4294.03 4346.43 3023.13 N 3087.51 E 5977681.30 N 374827.52 E 0.744 1212.53
6585.39 56.930 41.810 4345.60 4398.00 3083.06 N 3141.27 E 5977740.31 N 374882.29 E 0.910 1240.08
6680.75 56.580 42.860 4397.88 4450.28 3142.02 N 3194.98 E 5977798.33 N 374937.00 E 0.991 1266.78
6776.24 55.920 42.520 4450.93 4503.33 3200.37 N 3248.81 E 5977855.76 N 374991.82 E 0.752 1292.91
------~-~----_._~~---_.---
16 April, 2003 - 9:29 Page 3 of 8 DrillQIJest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Alpine CD·2 . CD2-08
Your Ref: API 501032044200
Job No. AKZZ30009. Surveyed: 6 February, 2003
Nortl1 Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6871.55 56.490 42.150 4503.95 4556.35 3258.93 N 3302.16 E 5977913.39 N 375046.16 E 0.680 1319.43
6967.44 56.430 41.730 4556.93 4609.33 3318.38 N 3355.57 E 5977971.92 N 375100.59 E 0.370 1346.71
7062.58 55.910 41.390 4609.89 4662.29 3377.51 N 3408.00 E 5978030.15 N 375154.02 E 0.622 1374.18
7158.17 56.350 41.760 4663.17 4715.57 3436.89 N 3460.67 E 5978088.61 N 375207.70 E 0.561 1401.75
,- 7253.42 56.940 41.170 4715.54 4767.94 3496.51 N 3513.35 E 5978147.32 N 375261.39 E 0.807 1429.53
7349.09 57.170 41 .190 4767.57 4819.97 3556.93 N 3566.22 E 5978206.83 N 375315.28 E 0.241 1457.94
7444.29 55.960 40.850 4820.02 4872.42 3616.87 N 3618.36 E 5978265.87 N 375368.44 E 1.305 1486.25
7540.03 55.240 41.060 4874.11 4926.51 3676.53 N 3670.14 E 5978324.64 N 375421.23 E 0.774 1514.49
7635.25 55.660 40.760 4928.11 4980.51 3735.80 N 3721.49 E 5978383.02 N 375473.60 E 0.512 1542.58
7730.24 55.990 41 .180 4981.47 5033.87 3795.14 N 3773.02 E 5978441 .47 N 375526.13 E 0.504 1570.65
7825.98 56.420 42.360 5034.72 5087.12 3854.47 N 3826.02 E 5978499.89 N 375580.14 E 1.118 1598.03
7921.20 56.730 42.520 5087.18 5139.58 3913.12 N 3879.65 E 5978557.61 N 375634.77 E 0.354 1624.51
8016.71 57.230 43.810 5139.22 5191.62 3971.53 N 3934.44 E 5978615.07 N 375690.54 E 1.248 1650.23
8111.98 57.760 43.230 5190.42 5242.82 4029.79 N 3989.76 E 5978672.38 N 375746.86 E 0.757 1675.56
8207.34 57.890 43.780 5241.20 5293.60 4088.33 N 4045.33 E 5978729.96 N 375803.41 E 0.507 1701.03
8303.06 57.520 43.630 5292.34 5344.74 4146.83 N 4101.23 E 5978787.49 N 375860.31 E 0.409 1726.30
8398.74 58.270 45.880 5343.20 5395.60 4204.37 N 4158.30 E 5978844.05 N 375918.35 E 2.141 1750.18
8493.94 58.110 45.820 5393.38 5445.78 4260.72 N 4216.34 E 5978899.40 N 375977.36 E 0.176 1772.55
8589.39 56.880 44.990 5444.67 5497.07 4317.23 N 4273.67 E 5978954.92 N 376035.64 E 1 .483 1795.40
8685.27 55.760 45.020 5497.84 5550.24 4373.64 N 4330.09 E 5979010.36 N 376093.02 E 1.168 1818.59
8780.76 55.410 45.500 5551.81 5604.21 4429.09 N 4386.04 E 5979064.84 N 376149.91 E 0.553 1 841 . 1 5
,--- 8876.16 53.720 46.300 5607.12 5659.52 4483.19 N 4441.85 E 5979117.97 N 376206.64 E 1.899 1862.58
8971.68 55.670 46.160 5662.32 5714.72 4537.11 N 4498.14 E 5979170.92 N 376263.84 E 2.045 1883.63
9067.46 57.830 44.960 5714.83 5767.23 4593.20 N 4555.32 E 5979226.02 N 376321.97 E 2.487 1906.17
9162.90 59.400 44.180 5764.53 5816.93 4651.24 N 4612.49 E 5979283.08 N 376380.13 E 1.787 1930.45
9258.30 59.710 44.140 5812.87 5865.27 4710.24 N 4669.79 E 5979341.09 N 376438.43 E 0.327 1955.51
9353.55 59.180 43.870 5861.30 5913.70 4769.24 N 4726.77 E 5979399.11 N 376496.41 E 0.608 1980.71
9448.72 58.990 43.780 5910.19 5962.59 4828.15 N 4783.31 E 5979457.04 N 376553.95 E 0.215 2006.04
9544.26 58.050 43.390 5960.08 6012.48 4887.16 N 4839.49 E 5979515.08 N 376611.13 E 1.044 2031.64
9639.79 55.900 42.780 6012.14 6064.54 4945.65 N 4894.20 E 5979572.63 N 376666.83 E 2.313 2057.4 7
9735.35 55.680 42.660 6065.87 6118.27 5003.71 N 4947.81 E 5979629.76 N 376721.43 E 0.253 2083.43
9830.92 56.720 43.290 6119.03 6171.43 5061.82 N 5001.95 E 5979686.93 N 376776.56 E 1.218 21 09. 1 9
9926.50 57.900 43.760 6170.66 6223.06 5120.14 N 5057.35 E 5979744.30 N 376832.94 E 1.302 2134.54
10022.22 57.900 44.650 6221.52 6273.92 5178.26 N 5113.88 E 5979801.45 N 376890.46 E 0.788 2159.19
10117.51 57.550 44.450 6272.41 6324.81 5235.68 N 5170.40 E 5979857.88 N 376947.96 E 0.408 2183.21
-.------- --
16 April, 2003 - 9:29 Page 4 of 8 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-08
Your Ref: AP/501032044200
Job No. AKZZ30009, Surveyed: 6 February, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
10213.15 56.360 44.150 6324.56 6376.96 5293.05 N 5226.39 E 5979914.29 N 377004.92 E 1.272 2207.45
10308.92 55.970 43.690 6377.88 6430.28 5350.35 N 5281.57 E 5979970.64 N 377061.08 E 0.570 2232.01
10404.17 55.540 42.840 6431.48 6483.88 5407.69 N 5335.54 E 5980027.04 N 377116.02 E 0.865 2257.16
10499.39 56.270 40.020 6484.87 6537.27 5466.80 N 5387.70 E 5980085.26 N 377169.18 E 2.569 2284.74
....-... 10595.54 59.410 36.180 6536.05 6588.45 5530.86 N 5437.87 E 5980148.45 N 377220.44 E 4.700 2317.62
10688.01 61.840 30.480 6581.44 6633.84 5598.17 N 5482.07 E 5980214.99 N 377265.79 E 5.979 2356.17
10785.62 61.640 25.220 6627.68 6680.08 5674.14 N 5522.22 E 5980290.27 N 377307.23 E 4.751 2404.28
10881.54 63.070 21.110 6672.20 6724.60 5752.25 N 5555.62 E 5980367.78 N 377341.96 E 4.078 2457.45
10976.46 64.940 18.730 6713.80 6766.20 5832.45 N 5584.67 E 5980447.48 N 377372.38 E 2.993 2514.52
11072.61 66.360 16.660 6753.45 6805.85 5915.90 N 5611.28 E 5980530.46 N 377400.41 E 2.455 2575.59
11168.05 67.520 12.730 6790.85 6843.25 6000.82 N 5633.54 E 5980614.99 N 377424.12 E 3.979 2640.02
11263.64 68.980 9.520 6826.27 6878.67 6087.92 N 5650.65 E 5980701.78 N 377442.72 E 3.473 2708.79
11359.06 70.170 5.160 6859.59 6911.99 6176.58 N 5662.06 E 5980790.24 N 377455.65 E 4.460 2781.63
11454.56 73.540 0.490 6889.34 6941.74 6267.18 N 5666.50 E 5980880.75 N 377461.63 E 5.834 2859.46
11549.86 77.120 356.700 6913.48 6965.88 6359.31 N 5664.21 E 5980972.90 N 377460.92 E 5.377 2941.81
11643.64 78.690 353.300 6933.13 6985.53 6450.65 N 5656.21 E 5981064.36 N 377454.49 E 3.920 3026.14
11740.74 79.450 349.990 6951.55 7003.95 6544.96 N 5642.36 E 5981158.89 N 377442.25 E 3.437 3115.86
11836.29 82.450 347.980 6966.58 7018.98 6637.56 N 5624.33 E 5981251.79 N 377425.81 E 3.765 3206.05
11932.08 86.110 345.120 6976.13 7028.53 6730.23 N 5602.15 E 5981344.83 N 377405.22 E 4.840 3298.24
12027.58 86.480 342.170 6982.30 7034.70 6821.67 N 5575.32 E 5981436.71 N 377379.96 E 3.107 3391.53
12123.18 86.600 337.620 6988.07 7040.47 6911.25 N 5542.53 E 5981526.85 N 377348.70 E 4.752 3486.01
.-. 12182.77 86.360 334.980 6991.73 7044.13 6965.71 N 5518.62 E 5981581.70 N 377325.74 E 4.440 3545.30
12290.93 88.210 331.750 6996.85 7049.25 7062.27 N 5470.20 E 5981679.07 N 377278.97 E 3.438 3653.29
12330.77 88.280 331.550 6998.07 7050.47 7097.31 N 5451.29 E 5981714.44 N 377260.66 E 0.532 3693.11
12426.18 89.880 331.650 6999.61 7052.01 7181.23N 5405.91 E 5981799.12 N 377216.73 E 1.680 3788.50
12521.79 90.120 330.670 6999.61 7052.01 7264.98 N 5359.80 E 5981883.64 N 377172.05 E 1.055 3884.10
12617.37 90.370 330.690 6999.20 7051.60 7348.31 N 5312.99 E 5981967.77 N 377126.68 E 0.262 3979.66
12712.95 90.920 330.830 6998.12 7050.52 7431.71 N 5266.31 E 5982051.95 N 377081.43 E 0.594 4075.21
12808.17 89.630 331.180 6997.66 7050.06 7514.99 N 5220.15 E 5982136.01 N 377036.71 E 1.404 4170.42
12904.05 89.450 330.830 6998.43 7050.83 7598.85 N 5173.68 E 5982220.65 N 376991.68 E 0.410 4266.28
12999.62 89.320 330.900 6999.46 7051.86 7682.32 N 5127.15 E 5982304.91 N 376946.58 E 0.154 4361.83
13094.80 91.660 329.840 6998.65 7051.05 7765.05 N 5080.10 E 5982388.43 N 376900.95 E 2.699 4456.97
13190.43 92.030 330.080 6995.57 7047.97 7847.79 N 5032.25 E 5982471.97 N 376854.53 E 0.461 4552.49
13282.49 92.280 330.280 6992.11 7044.51 7927.60 N 4986.51 E 5982552.56 N 376810.16 E 0.348 4644.45
13381.62 92.710 329.440 6987.79 7040.19 8013.25 N 4936.78 E 5982639.04 N 376761.90 E 0.951 4743.42
._----------~--------- -
16 April, 2003 - 9:29 Page 50f8 Dril/Quest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-08
Your Ref: API 501032044200
Job No. AKZZ30009, Surveyed: 6 February, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
13474.03 92.710 329.4 70 6983.42 7035.82 8092.74 N 4889.87 E 5982719.33 N 376716.36 E 0.032 4835.64
13571.88 91.970 330.600 6979.43 7031.83 8177.44 N 4841.04 E 5982804.85 N 376668.98 E 1.380 4933.36
13668.71 91.660 330.280 6976.36 7028.76 8261.63 N 4793.29 E 5982889.84 N 376622.68 E 0.460 5030.11
13762.76 91.660 330.620 6973.63 7026.03 8343.41 N 4746.93 E 5982972.41 N 376577.73 E 0.361 5124.09
r........-. 13856.62 90.800 331.980 6971.62 7024.02 8425.72 N 4701.86 E 5983055.47 N 376534.08 E 1.714 5217.92
13951.21 89.880 332.260 6971.06 7023.46 8509.32 N 4657.63 E 5983139.82 N 376491.29 E 1.017 5312.50
14049.92 89.820 332.800 6971.32 7023.72 8596.90 N 4612.10 E 5983228.17 N 376447.26 E 0.550 5411.21
14145.61 90.120 331.930 6971.37 7023.77 8681.68 N 4567.72 E 5983313.69 N 376404.33 E 0.962 5506.89
14241.02 91.050 331.880 6970.39 7022.79 8765.84 N 4522.79 E 5983398.61 N 376360.85 E 0.976 5602.30
14335.70 90.370 332.610 6969.22 7021.62 8849.62 N 4478.70 E 5983483.13 N 376318.20 E 1.054 5696.97
14431.27 90.800 331.810 6968.24 7020.64 8934.16 N 4434.14 E 5983568.42 N 376275.10 E 0.950 5792.53
14527.02 88.830 333.610 6968.55 7020.95 9019.25 N 4390.25 E 5983654.25 N 376232.67 E 2.787 5888.26
14622.91 87.660 333.170 6971.49 7023.89 9104.94 N 4347.32 E 5983740.66 N 376191.21 E 1.303 5984.07
14718.42 87.600 333.960 6975.44 7027.84 9190.39 N 4304.84 E 5983826.82 N 376150.19 E 0.829 6079.46
14814.27 87.850 333.490 6979.24 7031.64 9276.26 N 4262.44 E 5983913.42 N 376109.27 E 0.555 6175.18
14906.63 89.140 332.960 6981.67 7034.07 9358.69 N 4220.85 E 5983996.54 N 376069.10 E 1.510 6267.48
15001.66 89.630 332.650 6982.69 7035.09 9443.21 N 4177.42 E 5984081.79 N 376027.12 E 0.610 6362.50
15100.15 91.410 332.650 6981.80 7034.20 9530.68 N 4132.17 E 5984170.03 N 375983.38 E 1.807 6460.97
15193.71 91.480 332.420 6979.44 7031.84 9613.67 N 4089.04 E 5984253.74 N 375941.67 E 0.257 6554.49
15291.15 91.480 332.230 6976.92 7029.32 9699.94 N 4043.79 E 5984340.77 N 375897.91 E 0.195 6651.90
15386.59 91 .600 332.930 6974.35 7026.75 9784.62 N 3999.86 E 5984426.19 N 375855.43 E 0.744 6747.30
~ 15482.13 91.230 332.900 6972.00 7024.40 9869.66 N 3956.37 E 5984511.96 N 375813.41 E 0.389 6842.79
15577.59 91.350 333.060 6969.85 7022.25 9954.68 N 3913.02 E 5984597.71 N 375771.51 E 0.209 6938.21
15673.19 90.980 332.770 6967.90 7020.30 10039.78 N 3869.50 E 5984683.54 N 375729.46 E 0.492 7033.78
15768.39 89.820 331.990 6967.24 7019.64 10124.12 N 3825.36 E 5984768.63 N 375686.77 E 1 .468 7128.97
15863.61 90.310 332.350 6967.13 7019.53 10208.33 N 3780.91 E 5984853.58 N 375643.77 E 0.639 7224.19
15958.97 89.380 331.820 6967.39 7019.79 10292.59 N 3736.27 E 5984938.60 N 375600.57 E 1.123 7319.55
16052.83 89.880 331.410 6967.99 7020.39 10375.17 N 3691.65 E 5985021.92 N 375557.37 E 0.689 7413.40
16147.08 90.430 331.470 6967.74 7020.14 10457.95 N 3646.59 E 5985105.46 N 375513.74 E 0.587 7507.65
16245.83 90.000 331.620 6967.37 7019.77 10544.77 N 3599.54 E 5985193.07 N 375468.18 E 0.461 7606.40
16340.80 90.120 330.920 6967.27 7019.67 10628.04 N 3553.89 E 5985277.12 N 375423.96 E 0.748 7701.36
16436.16 90.860 330.650 6966.45 7018.85 10711.27 N 3507.35 E 5985361.13 N 375378.85 E 0.826 7796.70
16531.84 92.030 330.380 6964.04 7016.44 10794.53 N 3460.27 E 5985445.19 N 375333.20 E 1 .255 7892.32
16625.28 92.830 329.900 6960.08 7012.48 10875.49 N 3413.79 E 5985526.93 N 375288.12 E 0.998 7985.63
16720.00 91.230 329.890 6956.72 7009.12 10957.38 N 3366.31 E 5985609.62 N 375242.05 E 1.689 8080.23
---------------- --" -- ---------
16 April, 2003 - 9:29 Page 60f8 DrillQlJest 3.03.02.005
DrillQuest 3.03.02.005
Page 7 of B
16 April, 2003 - 9:29
-..-------
Based upon Minimum Curvature type calculations, at a Measured Depth of 18050.00ft.,
The Bottom Hole Displacement is 12399.46ft., in the Direction of 12.542° (True).
/~
Magnetic Declination at Surface is 24.715°(17 -Jan-03)
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from 1646' FNL, 1554' FEL and calculated along an Azimuth of 331.900° (True).
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 52.4' MSL. Northings and Eastings are relative to 1646' FNL, 1554' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes. Zone 4.
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-0B
Your Ref: API 501032044200
Job No. AKZZ30009, Surveyed: 6 February, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
16818.62 90.800 330.260 6954.98 7007.38 11042.84 N 3317.12 E 5985695.91 N 375194.32 E 0.575 8178.78
16913.88 88.590 329.510 6955.48 7007.88 11125.23 N 3269.33 E 5985779.11 N 375147.95 E 2.450 8273.97
17009.55 88.890 329.740 6957.59 7009.99 11207.75 N 3220.97 E 5985862.44 N 375101.00 E 0.395 8369.55
17104.83 89.020 330.080 6959.33 7011.73 11290.18 N 3173.20 E 5985945.67 N 375054.66 E 0.382 8464.75
/~ 17200.18 89.570 330.070 6960.50 7012.90 11372.81 N 3125.64 E 5986029.11 N 375008.52 E 0.577 8560.05
17296.01 89.880 329.510 6960.96 7013.36 11455.62 N 3077.42 E 5986112.73 N 374961.73 E 0.668 8655.81
17391.60 90.620 329.510 6960.54 7012.94 11537.99 N 3028.92 E 5986195.92 N 374914.64 E 0.774 8751.31
17486.67 91.110 329.390 6959.11 7011.51 11619.86 N 2980.60 E 5986278.60 N 374867.73 E 0.531 8846.29
17581.96 91.540 328.400 6956.90 7009.30 11701.42 N 2931.39 E 5986361.00 N 374819.92 E 1.132 8941.42
17677.90 87.850 329.710 6957.41 7009.81 11783.69 N 2882.07 E 5986444.09 N 374772.01 E 4.081 9037.22
17773.79 86.710 329.510 6961.96 7014.36 11866.31 N 2833.61 E 5986527.53 N 374724.98 E 1.207 9132.92
17869.51 87.470 329.390 6966.82 7019.22 11948.63 N 2785.02 E 5986610.68 N 374677.81 E 0.804 9228.43
17964.66 88.690 329.110 6970.01 7022.41 12030.36 N 2736.40 E 5986693.22 N 374630.59 E 1.315 9323.43
18050.00 88.690 329.110 6971.96 7024.36 12103.58 N 2692.60 E 5986767.18 N 374588.05 E 0.000 9408.64 Projected Survey
DrillQuest 3.03.02.005
Page 8 of8
16 April, 2003 - 9:29
,,-~.
348.80 Tolerable Gyro (CD2-08 Gyro)
7024.36 AK-6 BP JFR-AK (CD2-08)
0.00 349.00
348.80 18050.00
0.00
349.00
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
From
Measured Vertical
Depth Depth
(ft) (ft)
Survey tool program for CD2-08
2692.60 E Projected Survey
12103.58 N
7024.36
18050.00
É~'
Comment
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Measured
Depth
(ft)
Comments
Alaska North Slope
North Slope, Alaska
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-08
Your Ref: API 501032044200
Job No. AKZZ30009, Surveyed: 6 February, 2003
)
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well CD2-08 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
18,050.00' MD
(if applicable)
)
~Oa-d&)
18-Apr-03
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
APR 2 2 2003
AlaSka Of; & Gas Cons. Comm' ,
Anmorage '-on
.~
.~
Sperry-Sun Drilling Services
/'~
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2-0B MWD
Job Ho. AKMW30009, Surveyed: 6 February, 2003
Survey Report
16 April, 2003
,.---.
Your Ref: API 501032044200
Surface Coordinates: 5974711.45 H, 371688.72 E (70020' 20.9101" H, 151002'28.3374" W)
Grid Coordinate System: HAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 974711.45 H, 128311.28 W (Grid)
Surface Coordinates relative to Structure: 268.01 H, 33.36 W (True)
Kelly Bushing: 52. 40ft above Mean Sea Level
Elevation relative to Project V Reference: 52.40ft
Elevation relative to Structure: 52.40ft
SPE!r"I-":/-SUI'l
DRILLING SERVIc:es
A Halliburton Company
Survey Ref: svy231
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-OB MWD
Your Ref: API 501032044200
Job No. AKMW30009, Surveyed: 6 February, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
349.00 4.500 44.000 296.40 348.80 5.32 N 5.29 E 5974716.68 N 371694.10 E 2.21 MWD Magnetic
377.06 4.610 44.930 324.37 376.77 6.91 N 6.85 E 5974718.25 N 371695.69 E 0.472 2.87
466.53 6.4 70 48.460 413.42 465.82 12.80 N 13.16 E 5974724.03 N 371702.10 E 2.113 5.10
556.08 6.810 50.930 502.37 554.77 19.50 N 21.06 E 5974730.58 N 371710.11 E 0.496 7.28
645.19 7.710 54.210 590.77 643.17 26.32 N 30.01 E 5974737.25 N 371719.18 E 1.112 9.08
/'---
734.19 7.860 57.910 678.95 731.35 33.05 N 40.01 E 5974743.81 N 371729.29 E 0.588 10.31
823.78 8.360 60.290 767.64 820.04 39.53 N 50.86 E 5974750.10 N 371740.24 E 0.672 10.92
913.79 11.250 62.760 856.33 908.73 46.79 N 64.35 E 5974757.13 N 371753.86 E 3.244 10.97
1007.42 16.240 61.730 947.25 999.65 57.18 N 84.01 E 5974767.18 N 371773.70 E 5.336 10.87
1105.51 23.100 52.750 1039.58 1091.98 75.35 N 111 .45 E 5974784.88 N 371801.44 E 7.623 13.97
1199.70 27.540 47.910 1124.71 1177. 11 101.14 N 142.33 E 5974810.14 N 371832.76 E 5.197 22.18
1294.02 27.280 47.810 1208.44 1260.84 130.28 N 174.53 E 5974838.72 N 371865.45 E 0.280 32.71
1389.56 29.060 48.450 1292.66 1345.06 160.37 N 208.12 E 5974868.24 N 371899.55 E 1.890 43.44
1485.28 31 .480 48.910 1375.32 1427.72 192.22 N 244.36 E 5974899.46 N 371936.33 E 2.540 54.47
1581.02 33.260 48.910 1456.18 1508.58 225.91 N 282.99 E 5974932.49 N 371975.53 E 1.859 65.99
1676.93 34.090 48.990 1536.00 1588.40 260.83 N 323.09 E 5974966.72 N 372016.23 E 0.867 77.91
1772.40 36.120 45.790 1614.11 1666.51 298.02 N 363.46 E 5975003.21 N 372057.23 E 2.869 91.70
1867.39 38.730 45.250 1689.54 1741.94 338.4 7 N 404.64 E 5975042.94 N 372099.09 E 2.769 107.98
1962.56 42.480 43.800 1761.78 1814.18 382.64 N 448.04 E 5975086.37 N 372143.24 E 4.063 126.50
2057.87 47.020 44.440 1829.45 1881.85 430.79 N 494.75 E 5975133.71 N 372190.77 E 4.787 146.97
2153.05 50.920 45.870 1891.92 1944.32 481.39 N 545.67 E 5975183.43 N 372242.54 E 4.251 167.63
2248.11 51.020 46.090 1951.78 2004.18 532.70 N 598.77 E 5975233.83 N 372296.52 E 0.208 187.88
----- 2343.41 52.640 44.430 2010.68 2063.08 585.44 N 651.97 E 5975285.65 N 372350.62 E 2.183 209.35
2438.93 54.980 41.350 2067.08 2119.48 641.93 N 704.40 E 5975341.23 N 372404.00 E 3.574 234.48
2534.28 54.840 42.110 2121.90 2174.30 700.16 N 756.33 E 5975398.56 N 372456.92 E 0.669 261.38
2629.57 53.730 42.620 2177.52 2229.92 757.32 N 808.4 7 E 5975454.83 N 372510.03 E 1.243 287.26
2725.33 53.430 44.300 2234.38 2286.78 813.25 N 861.46 E 5975509.84 N 372563.98 E 1 .446 311.63
2819.31 53.040 47.200 2290.64 2343.04 865.78 N 915.38 E 5975561.44 N 372618.78 E 2.506 332.57
2835.13 52.960 46.830 2300.16 2352.56 874.39 N 924.62 E 5975569.89 N 372628.17 E 1.935 335.82
2957.49 53.650 47.510 2373.27 2425.67 941.09 N 996.58 E 5975635.35 N 372701.25 E 0.719 360.76
3053.00 54.780 48.330 2429.12 2481.52 993.01 N 1054.08 E 5975686.28 N 372759.64 E 1.373 379.48
3148.40 56.040 48.670 2483.28 2535.68 1045.05 N 1112.90 E 5975737.30 N 372819.34 E 1.353 397.67
3243.67 56.500 47.500 2536.18 2588.58 1097.98 N 1171.86 E 5975789.21 N 372879.20 E 1.130 416.60
3339.11 56.890 48.070 2588.59 2640.99 1151.57 N 1230.94 E 5975841.79 N 372939.18 E 0.645 436.05
3434.46 55.290 48.060 2641.78 2694.18 1204.45 N 1289.80 E 5975893.65 N 372998.94 E 1.678 454.97
16 April, 2003 - 9:32 Page 2 of B DrillQlJest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-OB MWD
Your Ref: API 501032044200
Job No. AKMW30009. Surveyed: 6 February. 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3529.94 59.430 44.320 2693.28 2745.68 1260.13 N 1347.75 E 5975948.33 N 373057.84 E 5.447 476.79
3625.90 60.110 40.280 2741.61 2794.01 1321.44 N 1403.52 E 5976008.68 N 373114.65 E 3.706 504.60
3720.62 57.740 39.960 2790.50 2842.90 1383.47 N 1455.80 E 5976069.80 N 373167.98 E 2.519 534.70
3816.07 55.590 41.750 2842.95 2895.35 1443.79 N 1507.95 E 5976129.22 N 373221.15 E 2.744 563.34
~. 3911.45 53.560 42.470 2898.23 2950.63 1501.45 N 1560.06 E 5976185.98 N 373274.24 E 2.215 589.66
4006.78 53.780 42.700 2954.71 3007.11 1557.99 N 1612.03 E 5976241.63 N 373327.17 E 0.302 615.06
4100.99 54.250 42.920 3010.06 3062.46 1613.92 N 1663.83 E 5976296.66 N 373379.93 E 0.533 640.00
4198.02 55.080 44.280 3066.18 3118.58 1671.23 N 1718.42 E 5976353.03 N 373435.49 E 1.428 664.84
4293.43 54.840 45.160 3120.96 3173.36 1726.74 N 1773.38 E 5976407.59 N 373491.39 E 0.796 687.92
4388.75 55.520 45.520 3175.39 3227.79 1781.74 N 1829.05 E 5976461.63 N 373547.99 E 0.778 710.22
4484.57 56.520 45.690 3228.94 3281.34 1837.33 N 1885.82 E 5976516.24 N 373605.70 E 1.054 732.51
4580.01 57.580 45.470 3280.85 3333.25 1893.38 N 1943.02 E 5976571.31 N 373663.86 E 1.127 755.02
4675.79 58.980 46.290 3331.21 3383.61 1950.10 N 2001.51 E 5976627.01 N 373723.31 E 1.633 777 .50
4771.38 60.270 46.910 3379.55 3431.95 2006.76 N 2061.43 E 5976682.64 N 373784.19 E 1.461 799.26
4866.65 61.840 44.450 3425.66 3478.06 2065.01 N 2121.06 E 5976739.86 N 373844.80 E 2.797 822.55
4961.99 59.710 38.470 3472.24 3524.64 2127.29 N 2176.14 E 5976801.18 N 373900.94 E 5.911 851.55
5057.63 54.410 36.940 3524.23 3576.63 2190.74 N 2225.24 E 5976863.79 N 373951.12 E 5.702 884.40
5152.91 55.660 36.540 3578.83 3631.23 2253.31 N 2271.94 E 5976925.56 N 373998.89 E 1.356 917.60
5248.48 52.350 41.040 3635.01 3687.41 2313.59 N 2320.30 E 5976984.99 N 374048.27 E 5.147 947.99
5344.61 51.200 50.910 3694.58 3746.98 2365.99 N 2374.45 E 5977036.46 N 374103.31 E 8.150 968.71
5439.68 56.620 58.500 3750.61 3803.01 2410.17 N 2437.15 E 5977079.56 N 374166.76 E 8. 604 978.15
.---.. 5534.99 59.180 54.270 3801.27 3853.67 2454.88 N 2504.34 E 5977123.12 N 374234.70 E 4.620 985.94
5630.68 60.660 52.280 3849.23 3901.63 2504.40 N 2570.69 E 5977171.49 N 374301.89 E 2.373 998.37
5725.98 60.840 52.220 3895.80 3948.20 2555.30 N 2636.44 E 5977221.26 N 374368.50 E 0.197 1012.31
5821.58 60.210 50.180 3942.84 3995.24 2607.45 N 2701.30 E 5977272.29 N 374434.24 E 1.971 1027.76
5917.04 59.000 46.650 3991 .15 4043.55 2662.07 N 2762.88 E 5977325.85 N 374496.75 E 3.432 1046.94
6012.33 59.350 44.800 4039.98 4092.38 2719.19 N 2821.46 E 5977381.96 N 374556.30 E 1.707 1069.73
6107.92 57.680 42.170 4089.91 4142.31 2778.32 N 2877.56 E 5977440.12 N 374613.40 E 2.925 1095.46
6203.51 57.080 43.440 4141.44 4193.84 2837.39 N 2932.27 E 5977498.24 N 374669.11 E 1.283 1121.80
6298.87 57.530 42.030 4192.95 4245.35 2896.33 N 2986.72 E 5977556.25 N 374724.57 E 1.331 1148.15
6394.24 58.390 42.510 4243.55 4295.95 2956.15 N 3041.10 E 5977615.13 N 374779.96 E 0.998 1175.31
6489.78 57.790 41.780 4294.05 4346.45 3016.28 N 3095.52 E 5977674.32 N 374835.40 E 0.903 1202.72
6585.39 56.930 41.810 4345.62 4398.02 3076.30 N 3149.18 E 5977733.41 N 374890.08 E 0.900 1230.39
6680.75 56.580 42.540 4397.90 4450.30 3135.41 N 3202.72 E 5977791.59 N 374944.63 E 0.738 1257.31
6776.24 55.920 42.460 4450.95 4503.35 3193.95 N 3256.36 E 5977849.20 N 374999.26 E 0.695 1283.68
____________ _-0______---------
16 April, 2003 - 9:32 Page 3 of 8 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for AlpIne CD·2 . CD2-0B MWD
Your Ref: API 501032044200
Job No. AKMW30009, Surveyed: 6 February, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6871.55 56.490 42.040 4503.96 4556.36 3252.58 N 3309.61 E 5977906.91 N 375053.51 E 0.701 1310.32
6967.44 56.430 41.710 4556.94 4609.34 3312.09 N 3362.96 E 5977965.50 N 375107.87 E 0.294 1337.69
7062.58 55.910 41.760 4609.91 4662.31 3371.06 N 3415.57 E 5978023.57 N 375161.48 E 0.548 1364.93
7158.17 56.350 41.720 4663.18 4715.58 3430.29 N 3468.41 E 5978081.88 N 375215.33 E 0.462 1392.28
~ 7253.42 56.940 41.330 4715.55 4767.95 3489.85 N 3521.16 E 5978140.53 N 375269.08 E 0.108 1419,98
7349.09 57.170 41.370 4767.58 4819.98 3550.12 N 3574.20 E 5978199.89 N 375323.15 E 0.243 1448.17
7444.29 55.960 41.310 4820.04 4872.44 3609.77 N 3626.67 E 5978258.63 N 375376.63 E 1.272 1476.07
7540.03 55.240 41 .360 4874.13 4926.53 3669.08 N 3678.85 E 5978317.04 N 375429.82 E 0.753 1503.82
7635.25 55.660 41.040 4928.13 4980.53 3728.09 N 3730.51 E 5978375.16 N 375482.48 E 0.521 1531.54
7730.24 55.990 41 .430 4981.48 5033.88 3787.19 N 3782.31 E 5978433.36 N 375535.28 E 0.486 1559.27
7825.98 56.420 42.480 5034.74 5087.14 3846.36 N 3835.50 E 5978491.61 N 375589.48 E 1.016 1586.41
7921.20 56.730 42.660 5087.19 5139.59 3904.88 N 3889.26 E 5978549.21 N 375644.23 E 0.362 1612.71
8016.71 57.230 44.020 5139.24 5191.64 3963.12 N 3944.22 E 5978606.50 N 375700.18 E 1.304 1638.20
8111.98 57.760 43.550 5190.43 5242.83 4021.13 N 3999.82 E 5978663.54 N 375756.76 E 0.695 1663.18
8207.34 57.890 43.300 5241.21 5293.61 4079.75 N 4055.30 E 5978721.21 N 375813.24 E 0.260 1688.76
8303.06 57.520 42.850 5292.35 5344.75 4138.85 N 4110.56E 5978779.35 N 375869.50 E 0.554 1714.87
8398.74 58.270 45.830 5343.21 5395.61 4196.80 N 4167.20 E 5978836.33 N 375927.13 E 2.752 1739.31
8493.94 58.110 45.920 5393.39 5445.79 4253.13 N 4225.27 E 5978891.65 N 375986.16 E 0.186 1761.64
8589.39 56.880 45.690 5444.69 5497.09 4309.24 N 4282.99 E 5978946.77 N 376044.82 E 1.305 1783.96
8685.27 55.760 45.360 5497.86 5550.26 4365.14 N 4339.92 E 5979001.68 N 376102.70 E 1.203 1806.45
8780.76 55.410 46.140 5551.83 5604.23 4420.10 N 4396.35 E 5979055.68 N 376160.06 E 0.767 1828.36
,-., 8876.16 53.720 46.800 5607.13 5659.53 4473.64 N 4452.70 E 5979108.24 N 376217.32 E 1.859 1849.05
8971.68 55.670 46.470 5662.34 5714.74 4527.17 N 4509.36 E 5979160.79 N 376274.89 E 2.061 1869.57
9067.46 57.830 45.250 5714.85 5767.25 4582.95 N 4566.83 E 5979215.58 N 376333.31 E 2.494 1891.71
9162.90 59.400 44.630 5764.55 5816.95 4640.62 N 4624.38 E 5979272.26 N 376391.83 E 1.736 1915.48
9258.30 59.710 44.520 5812.89 5865.29 4699.21 N 4682.10 E 5979329.85 N 376450.55 E 0.340 1939.97
9353.55 59.180 44.260 5861.31 5913.71 4757.82 N 4739.48 E 5979387.4 7 N 376508.93 E 0.604 1964.65
9448.72 58.990 44.070 5910.21 5962.61 4816.39 N 4796.37 E 5979445.06 N 376566.81 E 0.263 1989.52
9544.26 58.050 43.870 5960.10 6012.50 4875.03 N 4852.94 E 5979502.72 N 376624.37 E 1.000 2014.60
9639.79 55.900 43.160 6012.16 6064.56 4933.11 N 4908.09 E 5979559.85 N 376680.51 E 2.335 2039.86
9735.35 55.680 43.090 6065.89 6118.29 4990.79 N 4962.11 E 5979616.59 N 376735.51 E 0.238 2065.29
9830.92 56.720 43.520 6119.05 6171.45 5048.58 N 5016.58 E 5979673.44 N 376790.96 E 1.151 2090.62
9926.50 57.900 44.060 6170.67 6223.07 5106.64 N 5072.25 E 5979730.55 N 376847.61 E 1.323 2115.62
10022.22 57.900 44.970 6221.54 6273.94 5164.46 N 5129.10 E 5979787.38 N 376905.44 E 0.805 2139.85
10117.51 57.550 44.770 6272.42 6324.82 5221.56 N 5185.94 E 5979843.50 N 376963.25 E 0.408 2163.44
-~--
16 April, 2003 - 9:32 Page 4 of 8 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-08 MWD
Your Ref: API 501032044200
Job No. AKMW30009, Surveyed: 6 February, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
10213.15 56.360 44.450 6324.57 6376.97 5278.63 N 5242.24 E 5979899.60 N 377020.52 E 1.275 2187.27
10308.92 55.970 44.020 6377.90 6430.30 5335.63 N 5297.73 E 5979955.64 N 377076.98 E 0.552 2211.41
10404.17 55.540 43.170 6431.50 6483.90 5392.65 N 5352.03 E 5980011.72 N 377132.24 E 0.865 2236.13
10499.39 56.270 40.250 6484.89 6537.29 5451.51 N 5404.48 E 5980069.68 N 377185.69 E 2.653 2263.35
~ 10595.54 59.410 36.400 6536.07 6588.47 5515.37 N 5454.89 E 5980132.66 N 377237.20 E 4.706 2295.93
10688.01 61.840 30.720 6581.46 6633.86 5582.50 N 5499.37 E 5980199.02 N 377282.81 E 5.962 2334.20
10785.62 61.640 25.570 6627.70 6680.10 5658.27 N 5539.91 E 5980274.09 N 377324.64 E 4.651 2381.95
10881.54 63.070 22.750 6672.21 6724.61 5735.79 N 5574.67 E 5980351.00 N 377360.72 E 3.001 2433.96
10976.46 64.940 19.490 6713.82 6766.22 5815.36 N 5605.38 E 5980430.04 N 377392.80 E 3.662 2489.69
11072.61 66.360 17.640 6753.46 6805.86 5898.40 N 5633.26 E 5980512.58 N 377422.09 E 2.292 2549.80
11168.05 67.520 13.010 6790.86 6843.26 5983.06 N 5656.45 E 5980596.84 N 377446.72 E 4.626 2613.56
11263.64 68.980 9.990 6826.29 6878.69 6070.05 N 5674.13 E 5980683.51 N 377465.90 E 3.308 2681.97
11359.06 70.170 5.320 6859.61 6912.01 6158.64 N 5686.03 E 5980771.89 N 377479.30 E 4.753 2754.52
11454.56 73.540 0.970 6889.36 6941.76 6249.22 N 5690.97 E 5980862.37 N 377485.80 E 5.584 2832.09
11549.86 77.120 357.280 6913.49 6965.89 6341.37 N 5689.54 E 5980954.53 N 377485.94 E 5.304 2914.05
11643.64 78.690 353.580 6933.15 6985.55 6432.76 N 5682.23 E 5981046.03 N 377480.19 E 4.205 2998.11
11740.74 79.450 350.370 6951.57 7003.97 6527.15 N 5668.91 E 5981140.63 N 377468.50 E 3.339 3087.65
11836.29 82.450 348.170 6966.60 7019.00 6619.84 N 5651.34 E 5981233.61 N 377452.52 E 3.876 3177.69
11932.08 86.110 345.720 6976.14 7028.54 6712.66 N 5629.81 E 5981326.79 N 377432.58 E 4.591 3269.71
12027.58 86.480 342.640 6982.32 7034.72 6804.34 N 5603.83 E 5981418.90 N 377408.17 E 3.242 3362.82
12123.18 86.600 337.880 6988.09 7040.49 6894.14 N 5571.61 E 5981509.23 N 377377.49 E 4.972 3457.21
..--- 12182.77 86.360 335.480 6991.75 7044.15 6948.75 N 5548.07 E 5981564.24 N 377354.89 E 4.040 3516.47
/ 12290.93 88.210 332.990 6996.87 7049.27 7046.04 N 5501.11 E 5981662.32 N 377309.60 E 2.866 3624.41
12330.77 88.280 331.930 6998.09 7050.49 7081.34 N 5482.70 E 5981697.94 N 377291.79 E 2.665 3664.23
12426.18 89.880 332.290 6999.62 7052.02 7165.66 N 5438.08 E 5981783.00 N 377248.62 E 1.719 3759.62
12521.79 90.120 329,210 6999.62 7052.02 7249.07 N 5391.36 E 5981867.20 N 377203.34 E 3.231 3855.20
12617.37 90.370 331.910 6999.21 7051.61 7332.30 N 5344.39 E 5981951.22 N 377157.80 E 2.837 3950.74
12712.95 90.920 337.120 6998.14 7050.54 7418.54 N 5303.28 E 5982038.15 N 377118.17 E 5.481 4046.19
12808.17 89.630 333.400 6997.68 7050.08 7505.00 N 5263.44 E 5982125.28 N 377079.82 E 4.135 4141.22
12904.05 89.450 331 .220 6998.45 7050.85 7589.89 N 5218.89 E 5982210.93 N 377036.73 E 2.281 4237.09
12999.62 89.320 333.340 6999.48 7051.88 7674.49 N 5174.44 E 5982296.27 N 376993.73 E 2.222 4332.65
13094.80 91.660 331.920 6998.66 7051.06 7759.00 N 5130.69 E 5982381.52 N 376951.43 E 2.876 4427.81
13190.43 92.030 330.990 6995.58 7047.98 7842.96 N 5085.02 E 5982466.25 N 376907.20 E 1.046 4523.38
13282.49 92.280 329.390 6992.12 7044.52 7922.78 N 5039.29 E 5982546.84 N 316862.85 E 1.758 4615.33
13351.62 92.710 330.040 6987.81 7040.21 8008.30 N 4989.34 E 5982633.20 N 376814.37 E 0.786 4714.30
-----~--- ---------- -------..-- --- -
16 April, 2003 - 9:32 Page 50f8 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-08 MWD
Your Ref: AP/501032044200
Job No. AKMW30009, Surveyed: 6 February, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
13474.03 92.710 330.770 6983.44 7035.84 8088.56 N 4943.75 E 5982714.23 N 376770.17 E 0.789 4806.57
13571.88 91.970 332.570 6979.44 7031.84 8174.62 N 4897.36 E 5982801.07 N 376725.25 E 1.988 4904.34
13668.71 91.660 332.070 6976.37 7028.77 8260.32 N 4852.40 E 5982887.53 N 376681.77 E 0.607 5001 .11
13762.76 91.660 332.910 6973.65 7026.05 8343.70 N 4808.98 E 5982971.64 N 376639.78 E 0.893 5095.12
...--- 13856.62 90.800 333.260 6971.64 7024.04 8427.38 N 4766.50 E 5983056.03 N 376598.74 E 0.989 5188.94
13951.21 89.880 333.480 6971.07 7023.47 8511.93 N 4724.11 E 5983141.29 N 376557.79 E 1.000 5283.49
14049.92 89.820 335.480 6971.33 7023.73 8601.00 N 4681.58 E 5983231.08 N 376516.80 E 2.027 5382.10
14145.61 90.120 334.310 6971.38 7023.78 8687.65 N 4640.98 E 5983318.41 N 376477.69 E 1.262 5477.65
14241.02 91.050 334.050 6970.41 7022.81 8773.53 N 4599.43 E 5983404.99 N 376437.61 E 1.012 5572.98
14335.70 90.370 338.420 6969.23 7021.63 8860.16 N 4561.29 E 5983492.25 N 376400.96 E 4.671 5667.36
14431.27 90.800 333.450 6968.26 7020.66 8947.39 N 4522.33 E 5983580.14 N 376363.50 E 5.220 5762.66
14527.02 88.830 334.640 6968.57 7020.97 9033.47 N 4480.43 E 5983666.93 N 376323.08 E 2.404 5858.34
14622.91 87.660 332.190 6971.50 7023.90 9119.18N 4437.54 E 5983753.36 N 376281.66 E 2.830 5954.14
14718.42 87.600 333.440 6975.45 7027.85 9204.06 N 4393.94 E 5983838.97 N 376239.52 E 1.309 6049.55
14814.27 87.850 333.390 6979.26 7031.66 9289.71 N 4351.08 E 5983925.34 N 376198.13 E 0.266 6145.29
14906.63 89.140 332.670 6981.68 7034.08 9372.00 N 4309.21 E 5984008.33 N 376157.68 E 1.599 6237.60
15001.66 89.630 333.220 6982.70 7035.10 9456.62 N 4265.99 E 5984093.69 N 376115.91 E 0.775 6332.61
15100.15 91.410 334.230 6981.81 7034.21 9544.93 N 4222.39 E 5984182.72 N 376073.83 E 2.078 6431.04
15193.71 91.480 332.620 6979.45 7031.85 9628.57 N 4180.55 E 5984267.07 N 376033.43 E 1.722 6524.53
15291.15 91.480 333.380 6976.93 7029.33 9715.36 N 4136.33 E 5984354.61 N 375990.70 E 0.780 6621.92
15386.59 91.600 335.510 6974.37 7026.77 9801.43 N 4095.18 E 5984441.37 N 375951.02 E 2.235 6717.23
/--- 15482.13 91.230 333.440 6972.01 7024.41 9887.61 N 4054.02 E 5984528.24 N 375911.35 E 2.200 6812.64
15577.59 91.350 333.790 6969.86 7022.26 9973.11 N 4011.61 E 5984614.45 N 375870.41 E 0.388 6908.03
15673.19 90.980 333.340 6967.92 7020.32 10058.69 N 3969.06 E 5984700.75 N 375829.33 E 0.609 7003.57
15768.39 89.820 332.360 6967.25 7019.65 10143.40 N 3925.62 E 5984786.19 N 375787.34 E 1.595 7098.75
15863.61 90.310 331.890 6967.14 7019.54 10227.57 N 3881 .10 E 5984871.11 N 375744.27 E 0.713 7193.97
15958.97 89.380 331 .220 6967.40 7019.80 10311.42 N 3835.68 E 5984955.72 N 375700.29 E 1.202 7289.33
16052.83 89.880 330.870 6968.01 7020.41 10393.54 N 3790.24 E 5985038.61 N 375656.27 E 0.650 7383.17
16147.08 90.430 331 .200 6967.75 7020.15 10476.00 N 3744.60 E 5985121.84 N 375612.04 E 0.681 7477.41
16245.83 90.000 333.690 6967.38 7019.78 10563.54 N 3698.92 E 5985210.15 N 375567.87 E 2.559 7576.15
16340.80 90.120 331.420 6967.28 7019.68 10647.82 N 3655.15 E 5985295.16 N 375525.55 E 2.394 7671.11
16436.16 90.860 331.300 6966.47 7018.87 10731.51 N 3609.45 E 5985379.62 N 375481.28 E 0.786 7766.46
16531.84 92.030 331.940 6964.06 7016.46 10815.66 N 3563.99 E 5985464.54 N 375437.27 E 1.394 7862.10
16625.28 92.830 331.510 6960.09 7012.49 10897.88 N 3519.76 E 5985547.50 N 375394.46 E 0.972 7955.46
16720.00 91.230 332.500 6956.74 7009.14 10981.46 N 3475.33 E 5985631.83 N 375351.46 E 1.986 8050.11
------ --~. ------------~- ---
16 April, 2003 - 9:32 Page 6 of 8 DrillQuest 3.03.02.005
Dri/lQuest 3.03.02.005
Page 70f8
16 April, 2003 - 9:32
---
Based upon Minimum Curvature type calculations, at a Measured Depth of 18050.00ft.,
The Bottom Hole Displacement is 12457.53ft., in the Direction of 13.061° (True).
.~...
Magnetic Declination at Surface is 24.7150 (17 -Jan-03)
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from 1646' FNL, 1554' FEL and calculated along an Azimuth of 331.9000 (True).
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 52.4' MSL. Northings and Eastings are relative to 1646' FNL, 1554' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-OB MWD
Your Ref: API 501032044200
Job No. AKMW30009, Surveyed: 6 February, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
16818.62 90.800 330.740 6954.99 7007.39 11068.21 N 3428.4 7 E 5985719.37 N 375306.09 E 1.837 8148.71
16913.88 88.590 329.900 6955.50 7007.90 11150.96 N 3381.30 E 5985802.92 N 375260.35 E 2.482 8243.93
17009.55 88.890 329.030 6957.60 7010.00 11233.34 N 3332.71 E 5985886.12 N 375213.17 E 0.962 8339.49
17104.83 89.020 330.190 6959.34 7011.74 11315.52 N 3284.52 E 5985969.10 N 375166.39 E 1.225 8434.68
,--- 17200.18 89.570 329.690 6960.51 7012.91 11398.04 N 3236.76 E 5986052.43 N 375120.05 E 0.780 8529.96
17296.01 89.880 329.290 6960.97 7013.37 11480.60 N 3188.11 E 5986135.81 N 375072.82 E 0.528 8625.71
17391.60 90.620 330.520 6960.56 7012.96 11563.30 N 3140.18 E 5986219.32 N 375026.31 E 1.502 8721.23
17486.67 91.110 334.570 6959.12 7011.52 11647.63 N 3096.36 E 5986304.39 N 374983.94 E 4.291 8816.27
17581.96 91.540 329.070 6956.91 7009.31 11731.57 N 3051.39 E 5986389.09 N 374940.42 E 5.788 8911.49
17677.90 87.850 329.440 6957.43 7009.83 11814.01 N 3002.35 E 5986472.36 N 374892.80 E 3.865 9007.31
17773.79 86.710 329.850 6961.98 7014.38 11896.66 N 2953.95 E 5986555.82 N 374845.82 E 1.263 9103.02
17869.51 87.470 330.000 6966.84 7019.24 11979.39 N 2906.04 E 5986639.35 N 374799.33 E 0.809 9198.56
17964.66 88.690 329.960 6970.02 7022.42 12061.73 N 2858.47 E 5986722.49 N 374753.17 E 1.283 9293.60
18050.00 88.690 329.110 6971.97 7024.37 12135.26 N 2815.21 E 5986796.76 N 374711.18 E 0.996 9378.85 Projected Survey
Dril/Quest 3.03.02.005
Page 8 of8
16 April, 2003 - 9:32
_.__.~--
.-
f~ .
348.80 Tolerable Gyro (C02-0B Gyro)
7024.37 MWO Magnetic (C02-0B MWD)
0.00 349.00
348.80 18050.00
0.00
349.00
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
From
Measured Vertical
Depth Depth
(ft) (ft)
Survey tool program for CD2-0B MWD
2815.21 E Projected Survey
12135.26 N
7024.37
18050.00
¡--.
Comment
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Measured
Depth
(ft)
Comments
Alaska North Slope
North Slope, Alaska
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-0B MWD
Your Ref: AP/501032044200
Job No. AKMW30009, Surveyed: 6 February. 2003
)
MAR 1 :1
Casing Detail
9 5/8" Surface Casing
I)jPHILLlPS Alaska, Inc.
'~ A Subsidiary of PHilLIPS PETROLEUM COMPANY
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN
Jts 3 to 68
Doyon 19 RKB to LDS
FMC Gen V Hanger
66 Jts 9-5/8" 36# J-55 BTC Csg
Davis Lynch Float Collar
2 Jts 9-5/8" 36# J-55 BTC Csg
Davis Lynch Float Shoe
Jts 1 to 2
9- 5/8" shoe @
TD 12 1/4" Surface Hole
RUN TOTAL 40 BOWSPRING CENTRALIZERS -
1 per jt on Jt #1 - # 12 (On stop rings of Jt #1 & #2)
14,16,18,20,22,24,26,28,30,32,34,36,38,
40,42,44,46,48,50,52,54,56,58,90,62,64,68,
75 joints total in shed - 68 joints total to run
Last 7 joints stay out, # 69 thru # 75.
Use API Mod Best 0 Life Artic Grade Csg Compound.
Remarks: Up Wt - 150K Ibs
On Wt -135K Ibs
Block wt 75K Ibs
Supervisor: G.R. Whitlock
d-O ~'" -;;) 5V
Well: CD2-08
Date: 1/20/2003
LENGTH
36.65
3.07
2762.24
1.51
83.96
1.74
DEPTH
TOPS
36.65
39.72
2801.96
2803.47
2887.43
2889.17
2900.00
)
ConocoPhillips Alaska
Cementing Report
Legal Well Name: CD2-08
Common Well Name: CD2-08
Event Name: ROT - DRILLING
Primary
Hole Size: 12.250 (in)
TMD Set: 2,889 (ft)
Date Set: 1/22/2003
Csg Type: Surface Casing
Csg Size: 9.625 (in.)
Cmtd. Csg: Surface Casing
Cement Co: Dowell Schlumberger
Rot Time Start: :
Rec Time Start: 07:00
Report #:
Start:
1
1/18/2003
Cement Job Type: Primary
Squeeze Open Hole
Hole Size:
sa TMD: (ft)
sa Date:
sa Type:
Cmtd. Csg:
Squeeze Casing
Hole Size:
TMD Set:
Date Set:
Csg Type:
sa TMD:
sa Date:
Cmtd. Csg:
Cementer: Steve Daughten
Pipe Movement
)
Page 1 of 3
Spud Date: 1/17/2003
Report Date: 1/22/2003
End:
Plug
Hole Size:
Top Set: (ft)
BTM set: (ft)
Plug Date:
Plug Type:
Drilled Out:
Cmtd. Csg:
Pipe Movement: Reciprocating
Time End: :
Time End: 09:40
RPM:
SPM:
Init Torque: (ft-Ibf)
Stroke Length: 15.0 (ft)
Avg Torque: (ft-Ibf) Max Torque: (ft-Ibf)
Drag Up: 150,000 (Ibs) Drag Down: 135,000 (Ibs)
Type: Cement Casing
Volume Excess %: 300.00
Meas. From: 250
Time Circ Prior
To Cementing: 1.25
Mud Circ Rate: 6 (gpm)
Mud Circ Press: 340 (psi)
Start Mix Cmt: 08:45
Start Slurry Displ: 08:45
Start Displ: 08:48
End Pumping: 10:20
End Pump Date: 1/22/2003
Top Plug: Y
Bottom Plug: Y
Stage No: 1 of 1
Disp Avg Rate:
Disp Max Rate:
Bump Plug:
Press Prior:
Press Bumped:
Press Held:
Float Held:
Mud Data
7.00 (bbllmin)
7.30 (bbllmin)
Y
800 (psi)
1 ,440 (psi)
5 (min)
Y
Returns: 100
Total Mud Lost: (bbl)
Cmt Vol to Surf: 250.00 (bbl)
Ann Flow After: N
Mixing Method:
Density Meas By:
Type: Spud Mud Density: 9.7 (ppg) Visc: 71 (s/qt)
Bottom Hole Circulating Temperature: (OF)
Displacement Fluid Type: Mud
PVIYP: 17 (cp)/18 (lb/100ft2) Gels 10 sec: 8 (lb/100ft2) Gels 10 min: 30 (lb/100ft2)
Bottom Hole Static Temperature: (OF)
Density: 9.7 (ppg) Volume: 196.60 (bbl)
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft) To: (ft)
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
------,,----------,-------~._--_._,-_.--------~-
Stage No: 1 Slurry No: 1 of 3
Description: MUDPUSH XL
Cmt Vol: (bbl) Density: (ppg)
Slurry Vol: (sk) Water Vol: (bbl)
Class:
Yield: (ft3/sk)
Other Vol: 0
Temperature: CF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
--_..,----,----,--_._._-".,---~---',-_._----
Purpose: PRIMARY
Mix Water: (gal)
Foam Job: N
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Printed: 3/512003 9:57:50 AM
)
ConocoPhillips Alaska
Cementing Report
Legal Well Name: CD2-08
Common Well Name: CD2-08
Event Name: ROT - DRILLING
Report #:
Start:
1
1/18/2003
Stage No: 1 Slurry No: 2 of 3
Slurry Data
Fluid Type: LEAD
Slurry Interval: 2,400.00 (ft)To: 36.00 (ft)
Water Source:
Description: ASLite
Cmt Vol: 333.5 (bbl)
Slurry Vol:422 (sk)
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
')
¡
Page 2 of 3
Spud Date: 1/17/2003
Report Date: 1/22/2003
End:
Class: G
Density: 10.60 (ppg) Yield: 4.44 (ft3/sk)
Water Vol: 202.2 (bbl) Other Vol: 0
Purpose: PRIMARY
Mix Water: 20.13 (gal)
Foam Job: N
Time
Compressive Strength 1:
Compressive Strength 2:
Trade Name
Stage No: 1 Slurry No: 20f 3 . Additives
0-124
0-53
S1
0-46
0-79
Type
FILLlTE
GYPSUM
ACCELERATOR
DEFOAMER
EXTENDER
Concentration Units
50.00 %BWOC
30.00 %BWOC
1.50 %BWOC
0.60 %BWOC
1.50 %BWOC
Stage No: 1 Slurry No: 3 of 3
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Liquid Cone.
Units
Slurry Data
Fluid Type: TAIL Description: LOW FLUID LOSS Class: G
Slurry Interval: 2,889.00 (ft)To: 2,400.00 (ft) Cmt Vol: 53.8 (bbl) Density: 15.80 (ppg) Yield: 1.17 (ft3/sk)
Water Source: Slurry Vol:244 (sk) Water Vol: 29.6 (bbl) Other Vol: 0
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Trade Name
Stage No: 1 Slurry No: 3 of 3 - Additives
0-46
0-65
S1
Type
DEFOAMER
DISPERSANT
ACCELERATOR
Concentration Units
0.20 %BWOC
0.30 %BWOC
2.00 %BWOC
Purpose: PRIMARY
Mix Water: 5.09 (gal)
Foam Job: N
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Liquid Cone.
Units
Printed: 3/512003 9:57:50 AM
')
)
ConocoPhillips Alaska
Cementing Report
Legal Well Name: CD2-08
Common Well Name: CD2-08
Event Name: ROT - DRILLING
Report #:
Start:
1
1/18/2003
Casing Test
Shoe Test
Test Press: 2,500 (psi)
For: 30 (min)
Cement Found between
Shoe and Collar: N
Pressure: 16.00 (ppge)
Tool: N
Open Hole: 30 (ft)
Hrs Before Test:
Liner lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool: N
Log/Survey Evaluation
Interpretation Summary
CBl Run: N
Under Pressure: (psi)
Bond Quality:
Cet Run: N
Bond Quality:
Temp Survey: N
Hrs Prior to log:
Cement Top: (ft)
How Determined: Cement returns
TOe Sufficient: Y
Job Rating: Very good
If Unsuccessful Detection Indicator:
Remedial Cementing Required: N
Number of Remedial Squeezes:
Page 3 of 3
Spud Date: 1/17/2003
Report Date: 1/22/2003
End:
Liner Top Test
Tool: N
Tool: N
Printed: 3/512003 9:57:50 AM
)
ConocoPhillips Alaska
Daily Drilling Report
I JOB NUMBER I EVENOTDCRODE 124 HRS PROG TMD I TVD I DFS
CD2-08 2,900.0 2,392.0 4.00
1 RIG NAME & NO. I FIELD NAME / OCS NO. AUTH MD I DAILY TANG
doyon1@ppco.Co Doyon 19 Alpine 16,265.0 0
ACCIDENTS LAST 24 HRS. ? DAILY INT WIO MUD
o
DATE OF LAST SAFETY MEETING DAILY TOTAL
Finish LOT. Swap mud. Drill ahead 1/19/2003 293,502
I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE
10027939
INC AZIM I LAST CASING I NEXT CASING
53.040 47.200 (in) @ (ft) (in) @ (ft)
DENSITY(ppg) I 9.50 I PP I IECD IMUD DATAl DAILYCOST 0 CUMCOST
FV PVNP GELS WLlHTHP FCIT.SOL OILIWAT %Sand/MBT Ph/pM Pf/Mf CI Ca H2S
43 10/12 3/10 8.61 21 I 0.2/20.0 8.01 /1 160
WELL NAME
SUPERVISOR
G.R. Whitlock
CURRENT STATUS
Performing LOT
24 HR FORECAST
LITHOLOGY
LAST SURVEY: DATE TMD
1/21/2003 2,819.31
BHA.NO. I 2
BHA WT. BELOW JARS
STRING WT. UP
BHA I HOLE CONDITIONS
STRING WT. DN STRING WT. ROT
ITEM DESCRIPTION
NO JTS
1
1
1
1
1
1
1
1
1
1
2
1
1
3
1
11
1
63
1
1
1
Bit
Geo Pilot
Drill Collar - NonMag
Stabilizer - Non Mag
LWD
Stabilizer - NonMag
LWD H-Cim
LWD DM Hoc
MWD MPT Pulser
Sub - Float
Flex Joint - Non Mag
Stabilizer - Non Mag
Flex Joint - NonMag
Drill Pipe - Heavy Wgt
Jars Daily DNT
Drill Pipe - Heavy Wgt
Crossover
Drill Pipe
Crossover
Ghost Reamer
Crossover
LENGTH
1.50
20.15
9.05
2.19
21.08
1.95
7.00
9.10
10.00
2.42
62.08
3.12
31.04
89.16
32.74
327.76
1.42
2,006.22
1.37
7.00
1.37
O.D.
12.250
7.625
6.750
6.750
6.750
6.750
6.750
6.750
6.750
2.500
6.750
6.750
6.750
5.000
6.375
5.000
6.500
4.000
6.500
6.500
6.500
BIT I RUN
21 21
SIZE MANUF.
8.500 Security
BITS
TYPE SERIAL NO. JETS OR TFA
FM2565 5012818 15/15/15/15/151
DEPTH IN DATE IN I·O-D-L·B·G·O·R
2,900.0 1/22/20031-1-CT-G-D-I-NO-TD
BIT OPERATIONS
GPM I PRESS I P BIT I HRS I 24Hr DIST I 24Hr ROP I CUM HRS I CUM DEPTH I CUM ROP
OPERATIONS SUMMARY
PHASE DESCRIPTION
SURFAC Finish UD BHA
SURFAC Clear floor
SURFAC RIU casing equipment. Hold pre-job safety meeting
BIT / RUN
WOB
RPM
FROM TO
00:00 00:30
00:30 01 :00
01 :00 02:00
TROUBLE SUB
PULD
RURD
RURD
HOURS
0.50
0.50
1.00
CODE
DRILL P
CASE P
CASE P
)
TORQUE I UNITS
I.D.
3.750
2.000
2.810
2.875
1.920
2.813
1.920
1.920
1.920
3.250
2.810
2.810
2.810
3.000
2.750
3.000
2.500
3.240
2.563
2.750
2.563
Page 1 of 2
I REPT NO. IDA TE
5 1/22/2003
I CUM. TANGo
CUM INTANG WI MUD
o
CUM COST WI MUD
807,962
AUTH.
3,916,203
LAST BOP PRES TEST
o
LIME
ES
BIT NO. 2
BHA LENGTH
2,647.72
CONN SIZE CONN TYPE
Printed: 3/512003 10:16:41 AM
ConocoPhillips Alaska
Daily Drilling Report
I JOB NUMBER I EVE~T;~DE 124 HRS PROG I T~~900.0
')
WELL NAME
CD2-08
FROM TO HOURS CODE TROUBLE SUB
02:00 06:00 4.00 CASE P RUNC
06:00 07:00 1.00 CASE P RURD
07:00 08:00 1.00 CASE P CIRC
--.---
08:00 10:30 2.50 CEMENT PUMP
)
Page 2 of2
[TVD IDFS
2,392.0 4.00
I REPT NO. IDA TE
5 1/22/2003
OPERATIONS SUMMARY
PHASE DESCRIPTION
SURFAC P/U and RIH wi 68 jts of 9-5/8" 36# J-55 BTC casing to 2889'. P/U wt=150,
SOW=120. Ran 40 centralizers: 1/jt first 12 jts, 1/every other jt jt 14 to surface.
SURFAC RID casing tools and M/U cementing head
SURFAC Circ and condition mud @ 6 bpmw/270 psi while reciprocating pipe
SURFAC Pump 40 bbl viscosified water wI nut plug wi rig pump. Pump 5 bbl water wi
DS and pressure test lines to 2500 psi. Mix/pump 50 bbl Mudpush @ 10.5
ppg. Mix/pump 333.5 bbl Lead (422 sx) @ 10.7 ppg. Had nut plug in returns.
Mix/pump 53.5 bbl Tail @ 15.8 ppg (244 sx). Drop top plug. Displace wi 20
bbl water/195.8 bbl mud. CIP @ 10:20 1/22103. Check floats-OK
SURFAC RID cement hed and UD landing jt
SURFAC RID riser
SURFAC N/U unihead. and test to 1000 psi-OK
SURFAC N/U BOPE, Change out TD saver sub
SURFAC Test BOPE. John Crisp, AOGCC, waived witnessing the test
SURFAC R/U bales, elevators and install wearring. R/U geopilot
SURFAC P/U BHA. Upload MWD, RIH wi NMDC
SURFAC RIH wi HWDP. Change out to 4" d.p. equipment. RIH w/1stand of d.p. and
test geopilot lines to 4000 psi.
SURFAC Cut 263' drilling line
24 HR SUMMARY: R/U and run 68 jts 9-5/8" 36# J-55 BTC casing to 2889'. Circ. Cement wi 422 sx Lead and 244 sx Tail. Bump plug @
10:20. N/U BOPE and test. M/U BHA and RIH. Cut drilling line
10:30 11 :00 0.50 CEMENT P RURD
-
11:00 12:00 1.00 CEMENT P RURD
12:00 13:00 1.00 CASE P NUND
13:00 14:30 1.50 CASE P NUND
14:30 18:30 4.00 CASE P DEQT
18:30 19:30 1.00 CASE P OTHR
---
19:30 22:00 2.50 DRILL P PULD
22:00 23:00 1.00 DRILL P TRIP
23:00 RIGMNT P RSRV
COMPANY
Phillips
Doyon
ACI
Sperry-Sun
SERVICE
ITEM
UNITS
gals
bbls
USAGE
1,700
1,450
Fuel
Water, Drilling
PERSONNEL DATA
NO. HOURS
1
----------
25
5
-- ---.. -------
5
COMPANY
MI Drilling Fluids
DSR
Dowell
FMC
SERVICE
NO.
3
4
2
1
HOURS
MATERIALS I CONSUMPTION
ON HAND ITEM
-8,29~______ Water, Potable
-3,105
USAGE
120
ON HAND
-220
UNITS
bbls
RESERVOIR NAME
CD2-48
RESERVOIR AND INTERVAL DATA
ZONE TOP BASE
CD2-08 2276 4 1450
COMMENTS
Printed: 3/512003 10:16:41 AM
PRESSURE INTEGRITY TEST
PHilliPS Alaska, Inc.
Doyon 19 I Date: 1/23/2003
I Pump used: I #1 Mud Pump I.
... Pumping down annulus and DP. ...
I Volume Input
I Rig:
G.R. Whitlock
C02-DB
Pump Rate:
0.2 Bbljmin
Volume/Stroke
Well Name:
Drilling Supervisor:
Strokes ... 0.1 000 Bbls/Strk ...
...
Type of Test: Casing Shoe Test LOT/FIT
Hole Size: 18-1/2"
RKB-CHF: 32.8 Ft
CasinQ Size and Description:
~asinQ Test
Mud Weight: 9.6 ppg
Mud 10 min Gel 67.0 Lb/100 Ft2
Test Pressure 2,500 psi
Rotating Weight 120,000 Lbs
BlocksfTop Drive Weight: 75,000 Lbs
Estimates for Test: -0.2 bbls
Pressure Integrity Test
Casing Test
I·
Shut-in
Min psi
o 820
0.25 810
0.5 810
1 800
1.5 79r
2 78~
2.5 775
3 770
3.5 765
4 760
4.5 750
5 745
5.5 740
6 740
6.5 735
7 730
7.5 730
8 725
8.5 720
9 715
9.5 715
10 7'
-J
Shut-in
Min psi
o 2500
1 2500
2 2500
3 2500
4 2500
5 2500
6 2500
7 2500
8 2500
9 2500
10 2500
15 2475
20 2475
25 2475
30 2475
Pumping
Strks psi
o 0
2 30
4 200
6 420
8 600
10 730
12 820
Pumping
Strks psi
o 0
4 500
8 750
12 1 000
16 1350
20 1700
24 2150
27 2500
Hole Depth
2,920 Ft-MD 2,406 Ft-TVD
1·1
Casing Shoe Depth
2,889 Ft-MD 2,387 Ft-TVD
I USE PICK liST
Pressure InteQritvTest
Mud Weight: 9.6 ppg
Mud 10 min Gel: 67.0 Lb/100 Ft2
Rotating Weight: 120,000 Lbs
BlocksfTop Drive Weight: 75,000 Lbs
Desired PIT EMW: 16.0 ppg
Estimates for Test: 794 psi
-0.1 bbls
I·
·l
EMW = Leak-off Pressure + Mud Weight = 820 + 9 6
0.052 x TVD 0.052 x 2387 .
EMW at 2889 Ft-MD (2387 Ft-TVD) = 16.2 ppg
PIT 15 Second
Shut-in Pressure, psi
810
- Lost 25 psi during test, held 99% -
= of test pressure.
3000-
1~~_
w
0::
:J
UJ
UJ
w
0::
Q.
~.--
3 0 5 10 15 20 25 30
Shut-In time, Minutes
o PIT Point
2
Volume Volume
Pumped Bled Back
1.2 I::Sbls _l::Sbls
Volume
Bled Back
2.1 I::Sbls
Volume
Pumped
2.f I::Sbls
Barrels
~LEAK-OFF TEST
~CASING TEST
Comments:
Phillips Alaska, Inc.
Jt Number Num of Jts
Jts 3 to 295
293 Jts
Jts 1 to 2
2 Jts
Remarks: Up Wt = k
)
)
Casing Detail
7" Intermediate Casinq
COMPLETE DESCRIPTION OF EQUIPMENT RUN
Doyon 19 RKB to LDS
FMC 11" X 7" Hanger
7" 26# L-80 BTCM Csg
7" Davis Lynch Float Collar
7" 26# L-80 BTCM Csg
7" Davis Lynch Float Shoe
7" shoe @
8-1/2" TD
23 straight blade centralizer 1 per jt. on jts. 1,2,3,5,7,9,11,13,15,17, 1 ~
27,29,31,33,35,37,39,41,43 ---- 3 straight blade cent. 225,226,227
33 straight blade centralizers 1 per 2 jts on jts 229,231,233,235,23'
241,243,245,247,249,251,253,255,257,259,261,263,265,267,269
271,273,275,277,279,281,283,285,287,289,291,293
Total of 59 centralizers
309 joints in pipe shed - 295 total jts. to run
Last 14 jts. stay out
Use Best-a-Life 2000 pipe dope
On Wt = k Block Wt= 75K
Supervisor: Don Mickey
Well: C02-08
Date: 1/29/2003
LENGTH
34.40
1.62
12119.35
1.32
83.36
1.47
DEPTH
TOPS
34.40
36.02
12155.37
12156.69
12240.05
12241.52
12252.00
)
ConocoPhillips Alaska
Cementing Report
Legal Well Name: CD2-08
Common Well Name: CD2-08
Event Name: ROT - DRILLING
Primary
Hole Size: 8.500 (in)
TMD Set: 12,242 (ft)
Date Set: 1/30/2003
Csg Type: Production Casing
Csg Size: 7.000 (in.)
Cmtd. Csg: Production Casing
Cement Co: Dowell Schlumberger
Rot Time Start:
Rec Time Start:
Time End:
Time End:
Type: Cement Casing
Volume Excess %: 40.00
Meas. From: none
Time Circ Prior
To Cementing: 1.50
Mud Circ Rate: 210 (gpm)
Mud Circ Press: 740 (psi)
Report #:
Start:
2
1/18/2003
Cement Job Type: Primary
Squeeze Open Hole
Hole Size:
sa TMD: (ft)
sa Date:
sa Type:
Cmtd. Csg:
Squeeze Casing
Hole Size:
TM D Set:
Date Set:
Csg Type:
sa TMD:
sa Date:
Cmtd. Csg:
)
Page 1 of 3
Spud Date: 1/17/2003
Report Date: 1/30/2003
End:
Plug
Hole Size:
Top Set: (ft)
BTM set: (ft)
Plug Date:
Plug Type:
Drilled Out:
Cmtd. Csg:
Cementer: Jim Thompson
Pipe Movement
Pipe Movement: No movement
RPM:
SPM:
Init Torque: (ft-Ibf)
Stroke Length: (ft)
Avg Torque: (ft-Ibf)
Drag Up: (Ibs)
Start Mix Cmt: 18:28
Start Slurry Displ: 18:28
Start Displ: 18:44
End Pumping: 19:54
End Pump Date: 1/31/2003
Top Plug: Y
Bottom Plug: Y
Stage No: 1 of 1
Disp Avg Rate:
Disp Max Rate:
Bump Plug:
Press Prior:
Press Bumped:
Press Held:
Float Held:
6.80 (bbllmin)
6.80 (bbl/min)
Y
880 (psi)
1,300 (psi)
10 (min)
Y
Max Torque: (ft-Ibf)
Drag Down: (Ibs)
Returns: 100
Total Mud Lost: (bbl)
Cmt Vol to Surf: (bbl)
Ann Flow After: N
Mixing Method: recirc.
Density Meas By: densometer
Type: Ultra Free Density: 9.9 (ppg) Visc: 38 (s/qt)
Bottom Hole Circulating Temperature: 84 (OF)
Displacement Fluid Type: Mud
PVIYP: 7 (cp)/19 (lb/100ft2) Gels 10 sec: 7 (lb/100ft2) Gels 10 min: 9 (lb/100ft2)
Bottom Hole Static Temperature: (OF)
Density: 9.9 (ppg) Volume: 441.40 (bbl)
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft)
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Mud Data
Stage No: 1 Slurry No: 1 of 3
To: (ft)
Description: ARCo wash
Cmt Vol: 20.0 (bbl) Density: 8.30 (ppg)
Slurry Vol: (sk) Water Vol: (bbl)
Class:
Yield: (ft3/sk)
Other Vol: 0
Temperature: CF)
Temperature: (OF)
Temperature: CF)
Time
Compressive Strength 1:
Compressive Strength 2:
Purpose: Chem. wash
Mix Water: (gal)
Foam Job: N
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Printed: 3/512003 9:56:55 AM
')
)
ConocoPhillips Alaska
Cementing Report
Page 2 of 3
Legal Well Name: CD2-08
Common Well Name: CD2-08
Event Name: ROT - DRILLING
Report #:
Start:
2
1/18/2003
Spud Date: 1/17/2003
Report Date: 1/30/2003
End:
Stage No: 1 Slurry No: 2 of 3
Slurry Data
Fluid Type: Spacer
Slurry Interval: (ft) To: (ft)
Water Source:
Description: MUDPUSH XL Class:
Cmt Vol: 50.0 (bbl) Density: 12.50 (ppg) Yield: (ft3/sk)
Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Stage No: 1 Slurry No: 3 of 3
Slurry Data
Fluid Type: LEAD Description:
Slurry Interval: 12,242.00 (fI}o: 10,418.00 (ftJ:;mt Vol: 61.0 (bbl)
Water Source: lake water Slurry Vol:300 (sk)
Class: G NEAT
Density: 15.38 (ppg) Yield: 1.16 (ft3/sk)
Water Vol: 34.0 (bbl) Other Vol: 0
Purpose: PRIMARY
Mix Water: (gal)
Foam Job: N
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Temperature: (OF)
Temperature: CF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Casing Test
Shoe Test
Liner Top Test
Test Press: 3,500 (psi)
For: 30 (min)
Cement Found between
Shoe and Collar: N
Pressure: 120.50 (ppge)
Tool: N
Open Hole: 30 (ft)
Hrs Before Test:
Liner Lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool: N
Tool: N
Tool: N
Log/Survey Evaluation
Interpretation Summary
CBL Run: N
Under Pressure: (psi)
Bond Quality:
Cet Run: N
Bond Quality:
Temp Survey: N
Hrs Prior to Log:
Cement Top: (ft)
How Determined:
TOC Sufficient: N
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required: N
Number of Remedial Squeezes:
Remarks
PJSM - Cement 7" casing - Pumped 5 bbl Arco wash - test lines to 3500 psi - pumped 15 bbls Arco wash - Pumped 50 bbls 12.5 ppg
Mudpush XI spacer - Dropped btm plug - Mixed & pumped 300 sks (61 bbls) 15.8 ppg Class G wI 0.20% D046, 0.25% D065, 0.02%
XE920, & 0.40% D-167 - @ 5 BIM @ 1000 psi - Dropped top plug - Pumped 20 bbl water fl Dowell- switch to rig pumps & displace wi
Printed: 31512003 9:56:55 AM
)
)
ConocoPhillips Alaska
Cementing Report
Page 3 of 3
Legal Well Name: CD2-08
Common Well Name: CD2-08
Event Name: ROT - DRILLING
Report #:
Start:
2
1/18/2003
Spud Date: 1/17/2003
Report Date: 1/30/2003
End:
Remarks
441.4 bbls 9.9 ppg LSND mud @ 6.8 81M @ 530 psi to 1100 psi - slowed pumps to 3.5 81M @ 880 psi for last 20 bbls of displacement -
bumped plug wi 1300 psi - check floats - floats held - CIP @ 1954 hrs. - full returns throughout job - RD cement head - LD landing jt.
Printed: 3/512003 9:56:55 AM
)
)
SUPERVISOR
Don Mickey
CURRENT STATUS
ConocoPhillips Alaska
Daily Drilling Report
1 JOB NUMBER I EVENOTDCRODE 124 HRS PROG TMD 1 TVD I DFS
CD2-08 12,252.0 7,048.0 12.00
I RIG NAME & NO. I FIELD NAME lacs NO. AUTH MD I DAILY TANG
doyon1@ppco.Co Doyon 19 Alpine 16,265.0 0
ACCIDENTS LAST 24 HRS.? DAILY INT W/O MUD
Prep to MU 61/8" BHA 0
24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL
MU BHA - RIH test casing - FIT - CIO to Flo-Pro - Drill ,1/27/2003 373,175
LITHOLOGY IJAR HRS OF SERVICE lBHA HRS sïNceïNSpJLEAKOFF AFE AUTH.
16.16 10027939 3,916,203
LA~;2~~;~~;: DATE 12~1M:2.77 8~~~60 3;~~~8~· --]~~~~;~:~~~--~~-, 142.0 (ft) I N~~~~;~:~~ @ 11,032.0 (ft) LAST BO~/~~~;;;;T
DENSITY(ppg) I 9.90 1 PP I 1 ECD 110.001 MUD DATA 1 DAILY COST 1 0 I CUM COST 1 0
FV PVIYP GELS WL/HTHP FC/T.SOL OIUWAT %Sand/MBT Ph/pM PflMf CI Ca H2S LIME
42 7/27 12/14 4.4/10.4 21 I 0.1/23.8 9.010 0.05/1 350 40
Page 10f 2
WELL NAME
1 REPT NO. IDA TE
13 1/30/2003
I CUM. TANGO
CUM INTANG WI MUD
o
CUM COST WI MUD
2,642,200
ES
OPERATIONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION
00:00 01:00 1.00 DRILL P OTHR INTRM1 Test 7" pipe ram & door seal to 3500 psi - pull test plug & test jt. - set thin wall
wear bushing
01:00 02:00 1.00 CASE P RURD INTRM1 RU to run 7" casing - MU Frank's fill up tool
02:00 02:30 0.50 CASE P SFTY INTRM1 Held pre job safety meeting wI rig crew & casing tong operator
02:30 16:30 14.00 CASE P RUNe I NTRM 1 Begin running 7" 26# L-80 MBTC casing - FS joint, 1 jt., FC joint, 1 jt. -
BakerLoc first 4 connections - Pump through shoe track OK - Ran 66 jts.- 7"
26# L-80 MBTC casing to 2895.77' - Circulate casing volume @ 2895' - 5 B/M
@270 psi - string wt. Up 115 On 110 - Continue running 7" 26# L-80 MBTC
casing to 7037' (170 jts total) - Circulate bottoms up @ 7037' @ 5 B/M @ 750
to 600 psi - string wt. Up 210 On 128 - Continue running 7" 26# L-80 MBTC
casing to 10,763' (260 jts. total) - Attempt to circulate btms up @ 4.5 B/M @
9030 psi - string beginning to take wt. - unable to pull up & break over -pulled
up to 350 k - shut down pumps & continue running 7" 26# L-80 MBTC casing
to 12,205' (295 jts. total) - MU hanger & landing jt. land 7" casing on fluted
mandrel hanger wI shoe @ 12,242' - FC @ 12,155' - RD fill up tool - MU
cement head
16:30 18:00 1.50 CEMENT P CIRC I NTRM 1 Circulate & condition for cement job lower YP to 19 - beginning rate 1.8 B/M @
860 psi - final rate 5 B/M @ 740 psi - Unable to reciprocate pipe
18:00 20:30 2.50 CEMENT P PUMP INTRM1 PJSM - Cement 7" casing - Pumped 5 bbl Arco wash - test lines to 3500 psi-
pumped 15 bbls Arco wash - Pumped 50 bbls 12.5 ppg Mudpush XI spacer-
Dropped btm plug - Mixed & pumped 300 sks (61 bbls) 15.8 ppg Class G wi
0.20% 0046, 0.25% 0065, 0.02% XE920, & 0.40% 0-167 - @ 5 B/M @ 1000
psi - Dropped top plug - Pumped 20 bbl water fl Dowell - switch to rig pumps &
displace wi 441.4 bbls 9.9 ppg LSND mud @ 6.8 B/M @ 530 psi to 1100 psi -
slowed pumps to 3.5 B/M @ 880 psi for last 20 bbls of displacement - bumped
plug wI 1300 psi - check floats - floats held - CIP @ 1954 hrs. - full returns
throughout job - RD cement head - LD landing jt.
20:30 21:30 1.00 DRILL P OTHR INTRM1 Pull thin wall wear bushing - Install 7" x 9 5/8" pack off & test to 5000 psi for 10
mins.
21:30 22:30 1.00 WELCTL P BOPE INTRM1 Install test plug - change top pipe rams f/7" to 3 1/2"x6" VBR
22:30 00:00 1.50 WELCTL P BOPE INTRM1 Begin to test BOPE
24 HR SUMMARY: Test 7" rams & door seal- RU & run 7" casing to 12,242' - cement 7" casing wi 61 bbls 15.8 ppg Class G - set pack off &
test - Begin testing BOPE
Printed: 3/512003 10:17:40 AM
WELL NAME
COMPANY
Phillips
Doyon
ACI
Sperry-Sun
MI Drilling Fluids
ITEM
Fuel
Water, Drilling
RESERVOIR NAME
CD2-48
)
)
CD2-08
ConocoPhillips Alaska
Daily Drilling Report
I JOB NUMBER I EVEONTDCRODE 124 HRS PROG I TMD I TVD
12,252.0 7,048.0
SERVICE
PERSONNEL DATA
NO. HOURS COMPANY
3 DSR
25 Dowell
5 FMC
4 Epoch
3
UNITS
gals
bbls
MATERIALS / CONSUMPTION
ON HAND ITEM
-27,636 Water, Potable
-9,025
UNITS
bbls
USAGE
2,662
540
RESERVOIR AND INTERVAL DATA
ZONE TOP BASE
CD2-08 10 2 1310
jDFS
12.00
SERVICE
COMMENTS
USAGE
90
I REPT NO.
13
Page 20f2
¡DATE
1/30/2003
NO. HOURS
4
2
1
2
ON HAND
-1 ,050
Printed: 3/512003 10:17:40 AM
Well Name:
Drilling Supervisor:
C02-DB
I Rig:
Don Mickey
PRESSURE INTEGRITY TEST
PHILLIPS Alaska, Inc.
Doyon 19 I Date: 1/31/2003
IPump used: I Cement Unit I.
.. Pump~ng down annulus. ..
Type of Test: Annulus Leak Off Test for Disposal Adequacy
Hole Size: 18-1/2" [ · Casing Shoe Depth
RKB-CHF: 34.0 Ft 2,889 Ft-MD 2,387 Ft-TVC
Casina Size and Description: 19-5/8" 36#/Ft J-55 BTC
Changes for Al!n~lar AdeQuacy Tes
Enter outer casing shoe test results in comments
Casing Description references outel casing string
Hole Size is that drilled below outer casing.
Use estimated TOC for Hole Depth.
Enter inner casing 00 at right.
Hole Depth
10,418 Ft-MO 6,492 Ft-TVO
I·r
Pressure IntearitvTes1
Mud Weight: 9.9 ppg
Inner casing 00 7.0 In.
Desired PIT EMW:
Estimates for Test:
13.8 ppg
484 psi
0.5 bbls
I·
1·1
EMW = Leak-off Pressure + Mud Weight = 785 + 9 9
0.052 x TVD 0.052 x 2387 .
EMW at 2889 Ft-MD (2387 Ft-TVD) = 16.2
PIT 15 Second
Shut-in Pressure, psi
540
1000 .
w
0::::
:J
tn 500-
tn
W
0::::
0..
o
o
8
Barrels
10
2 4
6
12
14
16
18
o
5 10 15 20 25
Shut-In time, Minutes
o PIT Point
.....CASING TEST
~LEAK-OFF TEST
Comments:
95/8" shoe FIT @ 16.1 PP£
I Volume Input
Barrels ...
Casing Test
Pumping Shut-in
Bbls psi Min psi
o
1
2
3
4
5
6
7
8
9
10
15
20
25
30
30
Volume Volume
Pumped Bled Back
0.0 l:ibls _ öbls
...
Pump Rate:
0.5 Bbl/min
...
Pressure Integrity Tes1
Pumping
Bbls psi
2.5 39
3 51
3.5 66
4 80
4.5 116
5 127
5.5 150
6 175
6.5 210
7 255
7.5 304
8 341
8.5 406
9 460
9.5 500
10 540
10.5 575
11 625
11.5 682
12 728
12.5 785
13 659
13.5 702
14 662
14.5 555
15 645
15.5 660
16 550
16.5 568
17 646
Volume
Pumped
1/.0 öbls
Shut-in
Min psi
o 550
0.25 540
0.5 541
1 537
1.5 53P
2 53~
2.5 532
3 530
3.5 527
4 526
4.5 522
5 522
5.5 520
6 518
6.5 516
7 511
7.5 510
8 510
8.5 506
9 507
9.5 503
10 Sf
~
Volume
Bled Back
_Öbls
Schlullbergep
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TIN: Beth
.-
~D-02 w/
} 9g-õl0z5 Z:~~~ .I /'
./ CD2-08 /
gO~-dÇ7CJ
Job#
Log Description
23112
RSTIWFL
IJECTION PROFILE
TEMP BASELINE & WARMBACKS
SCMT
.-,
-
SIGNE~~~t')\ ~'-. /'\~.'-º ~~~ ./\/\
Date
03/23/03
03/23/03
03/24/03
03/22/03
DATE:
04/09/03
NO. 2747
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Alpine
BL
Color
Prints
CD
1
RECt1VEO
APR 1 4 2003
Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you.
Alaska 0;-: & Gas Cons. Commission
.Aochor~ge
CD2-08 Request to commence injection
Subject: CD2-08 Request to comm.....le injection £,.O~ - ~ So )
Date: Tue, 25 Mar 2003 09:40:42 -0900
From: "Clifford L Crabtree" <C.L.Crabtree@conocophillips.com>
To: winton_aubert@admin.state.ak.us, Tom Maunder <tom_maunder@admin.state.ak.us>
CC: "Alpine Lead Operators" <alp1006@ppco.com>, "NSK Problem Well Supv" <n1617@ppco.com>,
"Chris R Pierson" <Chris.R.Pierson@conocophillips.com>
Winton/Tom
Attached is the PDF for the CD2-08 cement Bond Log as well as the map
showing wells within 1320 feet. Important details follow:
Tubing Tail
Alpine C Sand Top
7" Casing Shoe
PBTD
11,026' MD (6,735' ss) @ 65 deg
11,836' MD (6,967' ss) @ 82 deg
12,242' MD (6,995' TVD ss)
18,050' MD (6,972' TVD ss)
Three hundred sacks of 15.8 cement were placed and the wiper plug bumped
OK. There were full circulation returns throughout the cement job.
The bond log indicates good bond acrossed the logged interval. We request
approval to commence injection.
(See attached file: CD2-08 SCMT.zip) (See attached file: CD2-08
1320_Plot.pdf) (See attached file: CD2-08 Schematic.pdf)
¡J1.J:i
~ ~,J!N)
Cliff Crabtree
ConocoPhillips Alaska Inc.- Alpine Subsurface Development
Office: (907) 265-6842¡ Cell: (907) 240-5357
Email: ccrabtr@ppco.com¡ Fax:: (907) 265-1515
V.¡-o-'¡f'-' If ! III '..1. :111 "II '·II!lIlf··.......t""·...:II...·'··~·····I· . ··...'''I/YW.WI.''· ..··-Y.Vlil'\j' ..¡,ro..··V. .: .1\IIH·:j····'u.-""'........"....""",..y.......... ····"I~II. ..... ....,' ,
; i Name: CD2-08 SCMT.zip :1
! ~CD2-08 SCMT.zip' Type: Zip Compressed Data (application/x-zip-compressed)!
¡ r Encoding: base64
},; 'I :<-'" 'W' "',W" >"v,,"<-,"'" ..,.... ..... ... ..... .... "J'" "J ..."."..., ·'c,··, ,., '" 'w' '·'.'W w'., w '.......~." ,.....' W.' 'w·.w...·.' '.'W."·' "'." ·w.·.·c' '.............' '-" \.W.¡...:.~,. ...C' '.' '·.....···········z·WJ·,·~~,'HÙ~.........·w··......·,'·;"';t>xv:'*"w,· 'I' ........, ""v v··v· v'" ..."..,.. ........ .' . '. ". .. '.' '.' '."-' . .... ..., ... ...., ...."" "K ... ·.,..·..."'/~;¡~.....V'.."" w.....',.. . ,...,.., :
["'.' , , Name: CD2-08 1320 Plot.pdf '
! ICD2-08 1320 Plot.pdfi Type: Portable Document Format (application/pdf),
¡ :!Encoding: base64 !
t> ·....11 ~..,..w Tty.v:-" ·..·jj,:LIIt-'''"' "VW V'J,^,> ""·,,,~!w. "NY"'''',,", ":Y'J:Jllt.,.WIK WM-'IWlAiY.'X~XI: 1-:Jli-'lIi ~H#N#\o'.X'l I\W>·:!l'.:W \o'X\o'·~'~\o'«WI<tI.-i ·~x '<11/;'11'1. :>,'Y":J 'I. "X«:>' v<'/.L' """'I'.....J"!X '·''iI'I,*,X:«'IIII1ILXV.'~:«'W.':<!'''''''''''' '.....' "'.o)IIIW "'I 'J:>'" '<IWIIIIIII·Ü(:J.-i+'II:i:J.-iIJol-K:-'XVlliBj,:IOII' aT' 'i" aU'.I¡: :II~
.. ....,.. .."'. ..,,' ".".
, . " ...., . "...... ..", .-. _n." Y· I" .....0;0 - -. - '" ,
Name: CD2-08 Schematic.pdf
ICD2-08 Schen1atic.pdfi Type: Portable Document Format (application/pdf),
i Encoding: base64
.""'_~""""""""'.''I......., .... ....... ...... ~·~"""v"""=. ~".,,~......."""""'.,,',.. . ''':11I11.::.:: ,. .IiII+::I. '\('P '~II'I""II':I'I''''''''II': 1I'.......I·.I:III.VilIIH·.·'" ......"'..,·"..·..··II'uv"....·'I··'~I::.:1
z-Hb s
pw.
6400
)
WELL DETAI LS
Name I N/RS I E/·W Northing Em~tìng
Lutlllldc Longitude Slot
eD2-08 (,9.657 -8.714 5974711.45 371688.72 70"20'20.910N 151"02'28.337W N/A
12000
/'
iC' .. ,Ph' "1·'1"
i ·onoco.· 11:11
11200
10400
9600
'"2
~
o
o
e::.
î
...0
1:::
o
~
...0
'5 8000
o
C/)
7200 .....
5600
4800- ~_H81C'@}_8f
1600
I
2400
I
3200
4000
I
4800
5600
6400
West( - )/East(+) [800ft/in]
)
CôñðêôP'hUlips ~Iâ$kà ,lhè~
TUBING
(32-11026,
00:4.500,
10:3.958)
~ODUCTION - ......
(34-12242,
00:7.000,
Wt:26,00)
G as Lift
MandrelNalvE
1
(10794-10795,
00:5,984)
PACKER
(10907-10908,
00:5,970)
NIP
(11014-11015,
00:5.000)
WLEG
(11025-11026,
00:5.000)
OPEN
HOLE
(12242-18050,
00:7.000)
I t
"I' ...'........
~i :1 ~
,'¡r',
j .,".
~~' .
~ ~..!: r
< l:;:
.
1:]
:!II.
., I
. ...... ..
I .......
6i~ili~:~f~l~~~1
.." .~,...I,····I;;; .......'
.,~f,~' tt1
:):~:~ ":.;: "; ':f~'~t~~
~;:"·,,~,::;w1, ~.·t··,w.t...
..;~~,u~~/:;, ~;~~.:~~ ~,~;.~..~'~ ~ '~',~~:~
CD2-08
API: 501032044200
SSSV Type: NONE
-
Annular Fluid:
Reference Log: 36 RKB
Last Tag: 11523
Last Tag Date: 2/21/2003
(:asing String - ALL STRINGS
Description Size
CONDUCTOR 16.000
PRODUCTION 7.000
SURFACE 9.625
OPEN HOLE 7.000
Tu~ing String - TUBING
Size I Top
4.500 32
Gas Lift MandrelsNalves
St MD TVD Man Man
Mfr Type
1 10794 6684 CAMCO KBG-2
Other (?Iugs, equip;, etc.' . JEWELRY
Depth TVD Type
33 33 HANGER
2235 1996 NIP
10907 6736 PACKER
11014 6782 NIP
11025 6786 WLEG
General Notes
Date Note
2/8/2003 TREE: FMC 41/16 5K
TREE CAP CONNECTION: 7" OTIS
Bottom
11026
)
ALPINE
Well Type: SVC
Orig
Completion:
Last W/O:
Ref Log Date:
TO: 18050 ftKB
Max Hole Angle: 93 deg <æ 16625
Top
o
34
36
12242
Bottom
114
12242
2889
18050
TVD
6787
I Wt I Grade I
12.60 L-80
V Mfr
CD2-08
Angle <æ TS: deg <æ
Angle @ TO: 89 deg @ 18050
Rev Reason: Tag, Pull ball/rod
Last Update: 3/7/2003
TVD
114
7047
2385
18050
Wt
109.00
26.00
36.00
0.00
V Type VOD Latch Port TRO
OV 1.0 BK 0.250 0
Description
FMC TBG HANGER
CAMCO 'DB' LANDING NIPPLE
BAKER S-3 PACKER W/MILLOUT EXTENSION
HES 'XN' NIPPLE
BAKER WLEG
Grade
H-40
L-80
J-55
Thread
WELDED
MBTC
BTC
Thread
IBTM
Date
Run
2/21/2003
Vlv
Cmnt
ID
4.500
3.812
3.875
3.725
3.875
('(1J,' r.~:l·"'~r~ ri~' , .cl.... F ¡1~
,\ \ IÜ j 1 '""'t
@ j LJ:- U :i_r:
)
WJ ~ !Æ ~!Æ~ ~«!Æ
)
AlfA~KA. OIL AND GAS
CONSERVATION COMMISSION
Chip Alvord
Drilling T earn Leader
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage AK 99510
FRANK H. MURKOWSKI, GOVERNOR
333 W. -rrn AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re: Colville River Unit CD2-08
ConocoPhillips Alaska, Inc.
Permit No: 202-250 (revised)
Surface Location: 1646' FNL, 1554' FEL, Sec. 2, T11N, R4E, UM
Bottomhole Location: 1890' FSL, 143' FWL, Sec. 24, T12N, R4E, UM
Dear Mr. Alvord:
Enclosed is the approved application for permit to drill the above referenced development well.
This permit to drill does not exempt you from obtaining additional permits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
~~~
Michael L. Bill
Commissioner
BY ORDER OF THE COMMISSION
DATED this30dday of January, 2003
cc: Department ofFish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
\kI6Ä- , Iz-t log
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
)
)
REVISED PERMIT TO DRILL
20 AAC 25.005
[L i1~¡ Çe J
1 a. Type of work: Drill 0 Redrill []
Re-entry DDeepen 0
2. Name of Operator
ConocoPhillips Alaska, Inc.
3. Address
P.O. Box 100360 Anchorage, AK 99510-0360
4. Location of well at surface
1646'FNL,1554'FEL,Sec.2,T11N,R4E,UM
At top of productive interval
113' FSL, 1370' FEL, Sec. 25, T12N, R4E, UM
At total depth ;
1890' FSL, 143' FWL, Sec. 24, T12N, R4E, UM /'
12. Distance to nearest property line 13. Distance to nearest well
1370' at target CD2-13: 24.6' at 950' MD
16. To be completed for deviated wells
Kickoff depth: 200 MD
18. Casing program
size
1b. Type of well. Exploratory 0 Stratigraphic Test
Service 0 Development Gas 0 Single Zone
5. Datum elevation (DF or KB)
DF 52 feet
o
o
Development Oil 0
Multiple Zone 0
10. Field and Pool
6. Property Designation
ADL 380075 & 380096 / ADL 25530
7. Unit or property Name
Colville River Unit
8. Well number
CD2-08
Colville River Field
Alpine Oil Pool
11. Type Bond (see 20 AAC 25.0251)
Statewide
Number
#59-52-180
9. Approximate spud date Amount
January 19, 2003 $200,000
14. Number of acres in property 1{!;. p~;;1 depth (MD and TVD)
2589 202o/MD I 7055' TVD
17. Anticipated pressure (see 20 AAC 25.035 (e)(2))~
Maximum hole angle
90.2°
Maximum surface 2526 psig
Setting Depth
At total depth (TVD) 3174 psig at 7015' TVDSS
Hole Casing Weight
42" 16" 62.5#
12.25" 9.625" 36#
8.5" 7" 26#
N/A 4.5" 12.6#
Specifications
Grade Coupling
H-40 Weld
J-55 BTC
L-80 BTC-M
L-80 IBT mod
Length
77'
2853'
12228'
11000'
Top Bottom Quantity of Cement
MD TVD MD TVD (include stage data)
37' 37' 114' 114' Pre-installed
37' 37' 2890' 2390' 529 sx AS IIIL, 230 sx Class G
37' 37' 12265' 7142' 296 sx Class G
32' 32' 11032' 6958' Tubing
/'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total Depth:
measured
true vertical
feet
feet
Plugs (measured)
Effective Depth:
measured
true vertical
feet
feet
Junk (measured)
Casing
Conductor
Surface
Production
Length
Size Cemented
Measured depth
True Vertical depth
n, ' ¡!",., t'o,. ~.,.. ~ ~ ,ê" r', r~,L
!N~ ." It ,-", \Ii \ ~ ~":, ~I
(j ~I> L ,:,,,1 ¡" ~ ~: t" L~'
Perforation depth:
measured
Ji-\N 2. B 2003
true vertical
20. Attachments Filing fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch 0 Drilling program 0
Drilling fluid program DTime vs depth plot Qefraction analysis 0 Seabed report 020 AAC 25.050 requirements 0
21. I hereby certify that the foregoing is true and correct to the best of my knowledge Questions? Call Brian Noe/265-6979
Signed
ChI> AI"'''' /~.A~ -.-c.
{k{
Title: Alpine Drilling Team Leader
Date ,(¿D{f.')
PrAnarArl hv Rhamn AlIs/ln-nrakA
Commission Use Only .,
Permit Number I API number I Approval date \ 1J"') 1\ /2. Isee cover letter
.2-0.2.. - 2.50 50- /c:J..1- ¿a .y ~ .2- N U'/ for other requirements
Conditions of approval Samples required 0 Yes ~ No Mud log required U Yes ~ No
Hydrogen sulfide measures 0 Yes 'g] No Directional survey required :g] Yes 0 No
Required working pressure for BOPE D2M; 0 3M; 0 5M; 0 10M; 0 0
Other: Atl O~·~ ~ fH"tv.Á.t- ('¡"¿p~,k:þ:~ Cfpl( .
ORIGINAL SIGNED BY . .
Approved by M L. DiU Commissioner
the commission
Date
l, 6Dj07
by order of
Form 10-401 Rev. 12/1/85·
J í1 / G ;;. !i'~ L
Submit in triplicate
)
)
Conoc6Phillips
Alaska, Inc.
P. O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
Dora I. Soria
Land Department, A TO 1466
Telephone 907- 265-6297
Facsimile 907- 263-4966
E-mail dsorla@ppco.com
January 27, 2003
Certified Mail
Mr. Mark Myers, Director
Division of Oil and Gas
Department of Natural Resources
Division of Oil and Gas
550 West 7th Ave, Suite 800
Anchorage, AK 99501
Mr. Jacob Adams, President
Arctic Slope Regional Corporation
1230 Agvik Street
P. O. Box 129
Barrow, AK 99723-0129
RE: Application for Tract Operation
Tract 14 (ADL 25530; L32097 -8)
CD2-08 Well, Colville River Unit
North Slope, Alaska
Gentlemen:
ConocoPhillips Alaska, Inc., as Unit Operator of Colville River Unit Agreement ("CRUA"),
("CPAI"), and on behalf of the Working Interest Owners of the Colville River Unit
("CRU"), (hereinafter referred to collectively as the "Parties"), hereby requests approval
from the Alaska Department of Natural Resources ("ADNR") and the Arctic Slope
Corporation (ASRC) for a tract operation to drill the CD2-08 We'" (the 'Well"). The Well
will be conducted as a tract operation to test the Alpine C Sand (the "Tract Operation").
CPAI anticipates commencing the drilling of the Well in the first quarter of 2003. CPAI
shall serve as Operator for the Well and Tract Operation.
The Tract Operation represents a modification of the CD1-20 well the Parties previously
proposed to drill pursuant to Attachment 5 to the Second Unit Plan of Development
(POD), Colville River Unit dated September 15, 2002. CD1-20, a 2,500 ft. long
horizontal well that was to be drilled from CD1 pad, is now being drilled from CD2 pad
and has been renamed CD2-08. Below are the outdated POD coordinates, the current
planned coordinates, and coordinates for a possible extension* (if the bit remains in
sand) :
The outdated POD coordinates are as follows:
Surface
Well Name
CD1-20
Bottomhole
Well Name
74
Well
Service
Injector
Proposed Start
of Completion
X starVY start
377266/5981658
Proposed End
of Completion
X starVY start
376124/5983882
oqrt'\ f,~'/.
[', ~" ~
, ¡ \'1 , i'J:·,t ~
)
)
The current planned coordinates:
Proposed End
of Completion
X start/Y start
375440/5985217
373614/5988776*
The Well will be directionally drilled to a projected depth of 6,995' SS TVD or 20,265'
TMD as per the new locations further described below:
Bottom hole
Well Name
74
Well
Service
Injector
Proposed Start
of Completion
X start/Y start
377266/5981658
"
Surface
Well Name
CD2-08
Surface Location: 1647' FNL and 1554' FEL of Section 2, T11 N-R4E, UM
Target Location: 5167' FNL and 1370' FEL of Section 25, T12N-R4E, UM
Bottomhole Location: 3390' FNL and 143' FWL of Section 24, T12N-R4E, UM
The proposed drillsite is within the Alpine Participating Area ("APA") on ADL-380075,
and the bottomhole location is outside the APA on lands covered by ADL-25530.
If successful, the Well will be completed as an injector'well to accommodate the MWAG
flood process. Moreover, if the Well proves to be a "Qualified Injection Well", it will be
treated in accordance with Article 9 of the CRUA and allocation in accordance with
Article 10 of the CRUA.
Please accept th.is letter as a request for approval for the Tract Operation. After the
drilling of the Well" CPAI will inform ADNR and ASRC of our findings and outline ,our
plans forward for the Well. Please do not hesitate to contact Brian Noel at 265-6979 or
the undersigned at 265-6297 with any questions you may have regarding this operation.
Very truly yours,
~/#~
Dora I. Soria
Senior Landman
DIS
(to)
O. . ",' 11
¡ ) ~ I
f ¡ lei J ~'J( , i J l'~ _
)
)
Alpine Participatine Area
WORKING INTEREST OWNERS' COMMITTEE
Phillips Alpine Alaska, LLC.
Mr. James M. Ruud
P. O. Box 100360
Anchorage, Alaska 99510-0360
(907) 263-4933
Fax: (907) 263-4966
Hunt Petroleum Corporation
Mr. Steve Brooks
3400 Thanksgiving Tower
Dallas, Texas 75201
(214) 880-8920
Fax: (214) 880-8951
Petro-Hunt, L.L.C.
Mr. Joe Lucas
1601 Elm Street, Suite 3500
Dallas, Texas 75201
(214) 880-8400
Fax: (214) 880-7101
Rosewood Resources
Mr. Chris Kidd
200 Crescent Court, Suite 300
Dallas, Texas 75201
(214) 871-5700
Fax: (214) 871-5110
Anadarko Petroleum Corporation
Mr. Craig Lewis
1201 Lake Robbins Dr.
The Woodlands, TX 77380
(832) 636-8443
Fax: (832) 636-8088
Chevron U. S. A. Inc.
Mr. Corey Woolington
P. O. Box 36366
Houston, Texas 77236
(281) 561-3653
Fax: (281) 561-3880
Kuukpik Corporation
Mr. Isaac Nukapigak, President
P. O. Box 187
Nuiqsut, AK 99789-0187
(907) 480-6220
Fax: (907) 480-6126
Mr., Brian Carter Boyd
Hicks Bo~d Chandler & Falconer
825 W. 8 Ave., #200
Anchorage, Alaska 99501
(907) 272-8401
Fax: (907) 274-3698
Ms. Krissell Crandall
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 564-4335
(907) 564-5132
Alfred James III, Revocable Trust
107 N. Market, Suite 1000
Wichita, Kansas 67202-1811
cc:
Anadarko Petroleum Corporation
Mr. John Bridges
3201 C. Street, Suite 603
Anchorage, Alaska 99503
(907) 273-6309
Fax: (907) 563-9479
Mr. Jacob Adams, President
Arctic Slope Regional Corporation
1230 Agvik Street
P. O. Box 129
Barrow, AK 99723-0129
Ms. Teresa Imm,
Resource Development Manager
Arctic Slope Regional Corporation
3900 C Street, Suite 801
Anchorage, Alaska 99503-5963
) ..., ~ :~~1 , f~ ~ ~ L
gl~ t! II f "
, " Ili J rd ¡~~,
r-
Sperry-Sun Drilling Services
Alaska North Slo
North Slope, AI;
Ai ·
---
<::)
=c
-~,~
Ct~
oposal Report
~~--bI
~c~
'~..
~
16 January, 2003
Your Ref: 4000' Extension from BHL #74 (Geo-PHot Opüon)
Surface Coordínates: 5974711.45 N, 371688.72 E (70020' 20.9101 II H, 151002128.3374" W)
Grid Coordinate System: NAD27 Alaska State Plsnes, Zone 4
"--
Kelly Bushing: 52.00n above Mean Sea Level
~y-c:n-.II!
qRIÇ;L..jiVq:_:-S~~~ï c;~tjj~
A Kaßîburton c~
Proposal Ref: prol0035
Sperry-Sun Drilling Services
Proposal Report for Alpine CD-2 - Plan: CD2-lJ8 - CD2-DS (wp02)
Your Ref: 4000' Extension from BHL #74 (Geo-PHot Option)
North Slope. Alaska
A/sska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
0.00 0.000 0.000 -52.00 0.00 O.ooN 0.00 E 5974711.45 N 0.00 SHL (1646' FNL & 1554' FEL, SEC
2 - T11N - R4E)
200.00 0.000 0.000 148.00 200.00 O.OON O.OOE 5974711.45 N 0.00 Begin Oir @ 2.00/1ooft: 2oo.ooft M
2oo.00ftTVO
300.00 2.000 40.000 247.98 299.98 1.34N 2.000 0.65
400.00 4.000 40.000 347.84 399.84 5.35N 2.000 2.60 "-
500.00 6.000 40.000 447.45 499.45 12.02 N 2.000 5.85
550.00 7.000 40.000 497.13 549.13 371702.72 E 2.000 7.96 Increase OLS to 2.5°/100ft: 550.00
MO,549.13ftTVO
600.00 7.701 48.105 546.72 598.72 5974732.06 N 371707.25 E 2.500 9.90
700.00 9.448 60.185 645.61 697.61 5974740.41 N 371719.51 E 2.500 11.74
800.00 11.475 68.290 743.94 795.94 5974747.89 N 371736.00 E 2.500 10.88 IncreaseOLS to 3.00/100ft : BOO.OOf
C) MO,795.94ftTVO
900.00 14.172 62.335 841.45 66.7 4 E 5974756.91 N 371756.25 E 3.000 9.68
::t:"'j 1000.00 16.969 58.280 90.00 E 5974769.87 N 371779.73 E 3.000 10.51
......
..... ... -L - '"'- 1100.00 19.824 55.354 116.37 E 5974786.73 N 371806.40 E 3.000 13.37
~-Þ^) 1200.00 22.715 53.142 145.77 E 5974807.45 N 371836.16 E 3.000 18.24
---- 1300.00 25.630 51 .409 178.14 E 5974831.97 N 371868.94 E 3.000 25.12
~ 1400.00 28.562 50.009 213.36 E 5974860.23 N 371904.66 E 3.000 33.99
~~;}J..~;~;:;;-.
~ 1500.00 31 .506 48.850· .,":- 1444.63 185.02 N 251.36 E 5974892.14 N 371943.21 E 3.000 44.81
r- 1600.00 34.458 47.871 - 1528.51 221.20 N 292.03 E 5974927.62 N 371984.49 E 3.000 57.57
1628.63 35.~6 47:6-17 "" 1552.00 232.21 N 304.15 E 5974938.42 N 371996.80 E 3.000 61.58 Permafrost
1700.00 -. 37.41'7 :'47.029 1609.47 260.89 N 335.25 E 5974966.57 N 372028.38 E 3.000 72.23
1800 0.0, -40.381. . -46.29~ 1687.28 303.99 N 380.90 E 5975008.88 N 372074.77 E 3.000 88.75 ~
1900.00 43.350 45.642 1709.75 1761.75 350.38 N 428.87 E 5975054.44 N 372123.53 E 3.000 107.08
2000.00.;£";;' 46.321 45.059 1780.65 1832.65 399.93 N 479.02 E 5975103.13 N 372174.51 E 3.000 127.17
2100.00 49.296 44.531 1847.81 1899.81 452.51 N 531.21 E 5975154.80 N 372227.60 E 3.000 148.96
2182.45 51.750 44.130 1900.22 1952.22 498.03 N 575.68 E 5975199.56 N 372272.84 E 3.000 168.18 End Oir, Start Sail @ 51.75°:
2182.45ft MO, 1952.22ft TVO
2200.00 51.750 44.130 1911.09 1963.09 507.92 N 585.27 E 5975209.28 N 372282.60 E 0.000 172.38
2300.00 51.750 44.130 1973.00 2025.00 564.29 N 639.95 E 5975264.71 N 372338.24 E 0.000 196.35
2400.00 51.750 44.130 2034.90 2086.90 620.66 N 694.64 E 5975320.13 N 372393.87 E 0.000 220.32
2500.00 51.750 44.130 2096.81 2148.81 677.03 N 749.32 E 5975375.55 N 372449.51 E 0.000 244.29
2581.06 51.7 50 44.130 2147.00 2199.00 722.72 N 793.64 E 5975420.48 N 372494.61 E 0.000 263.71 C40
2600.00 51.750 44.130 2158.72 2210.72 733.39 N 804.00 E 5975430.98 N 372505.15 E 0.000 268.25
16 January. 2003 - 6:17
Page 2 of 11
DriI/Quest 3.03.02.002
Sperry-Sun Drilling Services
Proposal Report for Alpine CD-2 - Plan: CD2-08 - CD2-08 (wp02)
Your Ref: 4000' Extension from BHL #74 (Geo-PHot Option)
Norlh Slope, Alaska
Alaska Norlh Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) eft) (ft) eft) (ft)
2700.00 51.750 44.130 2220.63 2272.63 789.76 N 858.68 E 5975486.40 N 292.22
2800.00 51.7 50 44.130 2282.54 2334.54 846.13 N 913.36 E 5975541.82 N 316.19
2889.58 51.750 44.130 2338.00 2390.00 896.62 N 962.34 E 5975591.47 N 337.66 9-5/8" Csg Pt ... Allow Build @
1.00/1ooft (8-1/2" Hole): 2889.58P-
MD,2390.ooftTVD
9 5/8" Casing ~~
2900.00 51.854 44.130 2344.44 2396.44 902.50 N 372672.06 E 1.000 340.16
2907.38 51.928 44.130 2349.00 2401.00 906.67 N 372676.18 E 1.000 341.93 C-30
3000.00 52.854 44 .130 2405.52 2457.52 975653.13 N 372728.16 E 1.000 364.32
3100.00 53.854 44.130 2465.21 2517.21 5975709.75 N 372785.00 E 1.000 388.81
3200.00 54.854 44.130 2523.48 2575.48 5975767.10 N 372842.58 E 1.000 413.61
3300.00 55.854 44.130 2580.33 2632.33 5975825.16 N 372900.86 E 1.000 438.72
3400.00 56.854 44 .130 2635.74 2687.74 5975883.91 N 372959.84 E 1.000 464.13
<::> 3422.49 57.079 44.130 2648.00 1264.00 E 5975897.22 N 372973.20 E 1.000 469.88
::¿~~1 3422.78 57.086 44.136 2648.16 1264.17 E 5975897.40 N 372973.37 E 3.000 469.96 End Dir, Start Sail @ 57.09° :
-,. 3422.78ft MD. 2700. 16ft TVD
¡¡P-" .:; 3500.00 57.086 44.136 1254.28 N 1309.31 E 5975943.14 N 373019.30 E 0.000 489.73
~~ ~- 3556.84 57.086 44.136 1288.52 N 1342.53 E 5975976.81 N 373053.11 E 0.000 504.29 C-20
-.....
~'" 3600.00 57.086 44.136 1314.53 N 1367.77 E 5976002.38 N 373078.78 E 0.000 515.35
--..-. ~ ~
,_~ _ -r,!<í'- .::;~~r::;~~! _'.
.-.......-...~~
~ 3700.00 57.086 44;136'~ - 2850.79 1374.78 N 1426.23 E 5976061.62 N 373138.26 E 0.000 540.96
r-- 3800.00 57.086' '.. _ 44;1~6. :_. 2905.13 1435.03 N 1484.68 E 5976120.86 N 373197.74 E 0.000 566.57
3900.00· 57.086 " ~4."13tr- . 2959.46 1495.27 N 1543.14 E 5976180.10 N 373257.22 E 0.000 592.18
4000.00- " 57.086 . -44.13(;, 3013.80 1555.52 N 1601.60 E 5976239.34 N 373316.71 E 0.000 617.80
4100.00 - 57.086' -'44.136 3068.14 1615.77 N 1660.06 E 5976298.58 N 373376.19 E 0.000 643.41 '~
4200 00 57086 44.136 3070.48 3122.48 1676.02 N 1718.52 E 5976357.82 N 373435.67 E 0.000 669.02
4300.od~"· 57.086 44.136 3124.81 3176.81 1736.27 N 1776.98 E 5976417.06 N 373495.15 E 0.000 694.63
4400.00 57.086 44.136 3179.15 3231.15 1796.52 N 1835.44 E 5976476.30 N 373554.63 E 0.000 720.25
4500.00 57.086 44.136 3233.49 3285.49 1856.77 N 1893.90 E 5976535.54 N 373614.11 E 0.000 745.86
4600.00 57.086 44.136 3287.83 3339.83 1917.02 N 1952.36 E 5976594.78 N 373673.59 E 0.000 771.47
4700.00 57.086 44.136 3342.16 3394.16 1977.27 N 2010.81 E 5976654.02 N 373733.08 E 0.000 797.09
4800.00 57.086 44.136 3396.50 3448.50 2037.52 N 2069.27 E 5976713.26 N 373792.56 E 0.000 822.70
4900.00 57.086 44.136 3450.84 3502.84 2097.77 N 2127.73 E 5976772.50 N 373852.04 E 0.000 848.31
5000.00 57.086 44.136 3505.18 3557.18 2158.02 N 2186.19 E 5976831.74 N 373911.52 E 0.000 873.92
5100.00 57.086 44.136 3559.51 3611.51 2218.27 N 2244.65 E 5976890.98 N 373971.00 E 0.000 899.54
16 January, 2003 - 6:17
Page 3 of 11
DrlflQuest 3.03.02.002
Sperry-Sun Drilling Services
Proposal Report for Alpine CD-2 - Plan: CD2-D8 - CD2-08 (wp02)
Your Ref: 4000' Extension from BHL #74 (Geo-PHot Option)
Nodh Slope Alaska
Alaska North Slope
Measured Sub-5ea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
5200.00 57.086 44.136 3613.85 3665.85 2278.52 N 2303.11 E 5976950.22 N 925.15
5300.00 57.086 44.136 3668.19 3720.19 2338.77 N 2361.57 E 5977009.46 N 950.76
5400.00 57.086 44 .136 3722.53 3774.53 2399.02 N 2420.03 E 5977068.70 N 976.38
5500.00 57.086 44.136 3776.86 3828.86 2459.27 N 2478.49 E 5977127.94 N 1001.99
5533.38 57.086 44.136 3795.00 3847.00 2479.38 N 2498.00 E 597 2N 1010.54 K-3 Marker
-
5600.00 57.086 44.136 3831.20 3883.20 374268.41 E 0.000 1027.60
5700.00 57.086 44.136 3885.54 3937.54 374327.89 E 0.000 1053.21
5800.00 57.086 44.136 3939.88 3991.88 374387.37 E 0.000 1078.83
5879.36 57.086 44.136 3983.00 4035.00 374434.58 E 0.000 1099.15 Base K-3 Sand
5900.00 57.086 44.136 3994.21 4046.21 374446.85 E 0.000 1104.44
5923.53 57.086 44.136 4007.00 5977378.84 N 374460.85 E 0.000 1110.47 K-2 Marker
6000.00 57.086 44.136 4048.55 5977424.14N 374506.33 E 0.000 1130.05
C) 6100.00 57.086 44.136 4102.89 5977483.38 N 374565.81 E 0.000 1155.67
::.:t:1 6105.73 57.086 44.136 4106.00 5977486.78 N 374569.22 E 0.000 1157.13 Base K-2 Cycle
6200.00 57.086 44.136 4157.23 5977542.62 N 374625.30 E 0.000 1181.28
~"'L:f,_.,
f"':" . 6300.00 57.086 44.136 2941.26 N 2946.16 E 5977601.87 N 374684.78 E 0.000 1206.89
~~) 6400.00 57.086 44.136 3001.51 N 3004.62 E 5977661.11 N 374744.26 E 0.000 1232.50
----
~~fta 6500.00 57.086 44.136 3061.76 N 3063.07 E 5977720.35 N 374803.74 E 0.000 1258.12
'~ 6600.00 57.086 ·;it 3122.01 N 3121.53 E 5977779.59 N 374863.22 E 0.000 1283.73
~ 6700.00 57.086 3182.26 N 3179.99 E 5977838.83 N 374922.70 E 0.000 1309.34
.~ .;~;fif)jf2;~. ·c~:£;h~L
~-- 6800.00, 57 ~oee 4483.25 4535.25 3242.51 N 3238.45 E 5977898.07 N 374982.18 E 0.000 1334.96
6900.00 57.086 4537.59 4589.59 3302.76 N 3296.91 E 5977957.31 N 375041.67 E 0.000 1360.57
7000.00 , "57·086'·' , 4591.93 4643.93 3363.01 N 3355.37 E 5978016.55 N 375101.15 E 0.000 1386.18 '--'
7100.0o.- , .57':086 . 4646.26 4698.26 3423.26 N 3413.83 E 5978075.79 N 375160.63 E 0.000 1411.79
7200.0Q 57.086 4700.60 4752.60 3483.51 N 3472.29 E 5978135.03 N 375220.11 E 0.000 1437.41
~~~;;,
7300.00 57.086 44.136 4754.94 4806.94 3543.76 N 3530.75 E 5978194.27 N 375279.59 E 0.000 1463.02
7400.00 57.086 44.136 4809.28 4861.28 3604.01 N 3589.21 E 5978253.51 N 375339.07 E 0.000 1488.63
7500.00 57.086 44.136 4863.61 4915.61 3664.26 N 3647.66 E 5978312.75 N 375398.55 E 0.000 1514.24
7600.00 57.086 44.136 4917.95 4969.95 3724.50 N 3706.12 E 5978371.99 N 375458.04 E 0.000 1539.86
7700.00 57.086 44.136 4972.29 5024.29 3784.75 N 3764.58 E 5978431.23 N 375517.52 E 0.000 1565.47
7800.00 57.086 44.136 5026.63 5078.63 3845.00 N 3823.04 E 5978490.47 N 375577.00 E 0.000 1591.08
7900.00 57.086 44.136 5080.96 5132.96 3905.25 N 3881.50 E 5978549.71 N 375636.48 E 0.000 1616.70
8000.00 57.086 44.136 5135.30 5187.30 3965.50 N 3939.96 E 5978608.95 N 375695.96 E 0.000 1642.31
8100.00 57.086 44.136 5189.64 5241.64 4025.75 N 3998.42 E 5978668.19 N 375755.44 E 0.000 1667.92
8200.00 57.086 44.136 5243.98 5295.98 4086.00 N 4056.88 E 5978727.43 N 375814.92 E 0.000 1693.53
16 January, 2003 - 6:17
Page 4 of 11
Dri/lQuest 3.03.02.002
Sperry-Sun Drilling Services
Proposal Report for Alpine CD-2 - Plan: CD2-lJ8 - CD2-1J8 (wp02)
Your Ref: 4000' Extension from SHL #74 (Geo-Pilot Option)
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
8300.00 57.086 44.136 5298.31 5350.31 4146.25 N 4115.34 E 5978786.67 N 1719.15
8400.00 57.086 44.136 5352.65 5404.65 4206.50 N 4173.79 E 5978845.91 N 1744.76
8500.00 57.086 44.136 5406.99 5458.99 4266.75 N 4232.25 E 5978905.15 N 1770.37
8600.00 57.086 44.136 5461.32 5513.32 4327.00 N 4290.71 E 5978964.39 N 1795.99
8700.00 57.086 44.136 5515.66 5567.66 4387.25 N 4349.17 E 597 3N 1821.60
'-
8800.00 57.086 44.136 5570.00 5622.00 376171.81 E 0.000 1847.21
8818.40 57.086 44.136 5580.00 5632.00 376182.76 E 0.000 1851.93 Albian-97
8900.00 57.086 44.136 5624.34 5676.34 376231.29 E 0.000 1872.82
9000.00 57.086 44.136 5678.67 5730.67 376290.77 E 0.000 1898.44
9100.00 57.086 44.136 5733.01 5785.01 376350.26 E 0.000 1924.05
9200.00 57.086 44.136 5787.35 5979319.83 N 376409.74 E 0.000 1949.66
a 9300.00 57.086 44.136 5841.69 5979379.07 N 376469.22 E 0.000 1975.28
9400.00 57.086 44.136 5896.02 5979438.31 N 376528.70 E 0.000 2000.89
-~,., 9500.00 57.086 44.136 5950.36 5979497.55 N 376588.18 E 0.000 2026.50
~ :3 9600.00 57.086 44.136 6004.70 5979556.79 N 376647.66 E 0.000 2052.11
-,-c.
~~ ._J 9639.20 57.086 4953.11 N 4898.22 E 5979580.02 N 376670.98 E 0.000 2062.15 Albian-96
&:..:.-....... ,~. ~ 9700.00 57.086 4989.74 N 4933.76 E 5979616.03 N 376707.14 E 0.000 2077.73
~~~ 9800.00 57.086 5049.99 N 4992.22 E 5979675.27 N 376766.63 E 0.000 2103.34
""'~ 9900.00 57.086 5110.24 N 5050.68 E 5979734.51 N 376826.11 E 0.000 2128.95
uo1:~ 10000.00 57.086 5170.49 N 5109.14 E 5979793.75 N 376885.59 E 0.000 2154.57
r-- 57 :flJt'J·&~.
10100.gº"¿\. 6276.39 6328.39 5230.74 N 5167.60 E 5979853.00 N 376945.07 E 0.000 2180.18
1 0200.~f~% 'r:::¡~ 6330.72 6382.72 5290.99 N 5226.05 E 5979912.24 N 377004.55 E 0.000 2205.79
10300.~, .~~ 6385.06 6437.06 5351.24 N 5284.51 E 5979971.48 N 377064.03 E 0.000 2231.40 .~
1 0382. 11if? 6429.94 6481.94 5401.01 N 5332.80 E 5980020.41 N 377113.16 E 0.000 2252.56 Begin Dir @ 4.0o/100ft: 10382.6Oft
10400.od*:· MD,6481.94ftTVD
57.210 43.320 6439.38 6491.38 5411.57 N 5342.90 E 5980030.80 N 377123.45 E 4.000 2257.12
10500.00 58.020 38.682 6492.96 6544.96 5475.28 N 5398.27 E 5980093.55 N 377179.90 E 4.000 2287.24
10600.00 58.996 34.132 6545.22 6597.22 5543.89 N 5448.85 E 5980161.29 N 377231.64 E 4.000 2323.95
10700.00 60.129 29.682 6595.90 6647.90 5617.07 N 5494.38 E 5980233.67 N 377278.42 E 4.000 2367.05
10800.00 61.406 25.338 6644.75 6696.75 5694.44 N 5534.66 E 5980310.35 N 377320.01 E 4.000 2416.33
10842.71 61.994 23.516 6665.00 6717.00 5728.68 N 5550.20 E 5980344.31 N 377336.14 E 4.000 2439.21 Top HRZ
10900.00 62.819 21.104 6691.54 6743.54 5775.65 N 5569.47 E 5980390.95 N 377356.21 E 4.000 2471.57
11000.00 64.356 16.980 6736.04 6788.04 5860.29 N 5598.66 E 5980475.08 N 377386.85 E 4.000 2532.48
11082.82 65.714 13.647 6771.00 6823.00 5932.69 N 5618.48 E 5980547.13 N 377407.90 E 4.000 2587.02 Base HRZ
11100.00 66.005 12.964 6778.03 6830.03 5947.95 N 5622.08 E 5980562.32 N 377411.76 E 4.000 2598.78
11200.00 67.756 9.054 6817.30 6869.30 6038.20 N 5639.62 E 5980652.26 N 377430.84 E 4.000 2670.13
16 January, 2003 - 6:17 Page 5 of 11 DrHIQuest 3.03.02.002
C)
::J:J
~...z..,~
~
---=
---
-2:
:r~
f--
Alaska Not1h Slope
Measured
Depth
(ft)
11215.14
11300.00
11338.91
11400.00
11492.95
11500.00
11600.00
11642.77
11700.00
11770.84
1 1800.00
11865.07
11900.00
12000.00
12100.00
12200.00
12264.86
locI.
68.030
69.599
70.338
71.522
73.373
73.516
75.572
76.468
77 .680
79.200
79.832
81.251
82.019
84.233
86.467
88.713
90.172
Azim.
8.470
5.242
3.784
1.522
358.141
357.887
354.326
352.824
350.832
348.391
347.394
345.182
344.002
340.646
337.317
334.004
331.859
;;;;;1~~::",,;; ;;
~.:;~~;~
12500.00
12600.00
12700.00
12800.00
12900.00
13000.00
13100.00
13200.00
13300.00
13400.00
90.172
90.172
90.172
90.172
90.172
90.172
90.172
90.172
90.172
90.172
16 January, 2003 - 6:17
331.859
331.859
331.859
331 .859
331 .859
331 .859
331 .859
331 .859
331 .859
331.859
Sub-Sea
Depth
(ft)
6823.00
6853.67
6867.00
6886.96
6915.00
6917.01
6943.67
6954.00
6966.80
6981.00
6986.31
6997.00
7002.08
7014.05
7022.16
7027.00
7026.89
7026.59
7026.29
7025.99
7025.69
7025.39
7025.09
7024.79
7024.49
7024.19
7023.89
7023.59
Sperry-Sun Drilling Services
Proposal Repot1 tor Alpine CD-2 - Plan: CD2-DS - CD2-QS (wp02)
Your Ref: 4000' Extension from BHL #74 (Geo-Pilot Option)
Vertical
Depth
(ft)
Local Coordinates
Northings Eastings
(ft) (ft)
6875.00
6905.67
6919.00
6938.96
6967.00
6052.07 N
6130.61 N
6167.05 N
6224.72 N
6313.32 N
6969.01
6995.67
7006.00
7018.80
7033.00
6983.23 N
7040.97 N
7079.00
7041.10 N
7078.89
7078.59
7071.96 N
7160.14 N
7078.29
7077.99
7077.69
7077.39
7077.09
7248.32 N
7336.50 N
7424.67 N
7512.85 N
7601.03 N
7076.79
7076.49
7076.19
7075.89
7075.59
7689.21 N
7777.39 N
7865.57 N
7953.74 N
8041.92 N
5641.76 E
5651.19 E
5654.07 E
5656.73 E
5656.46 E
5487.10 E
5457.59 E
5457.52 E
5441.02 E
5393.85 E
5346.69 E
5299.52 E
5252.36 E
5205.19 E
5158.03 E
5110.87 E
5063.70 E
5016.54 E
4969.37 E
4922.21 E
Page6ot11
Global Coordinates
Northings Eastings
(ft) (ft)
5980666.09 N
5980744.46 N
5980780.84 N
5980838.46 N
5N
5981223.29 N
5981285.89 N
5981319.36 N
5981414.44 N
5981508.05 N
5981599.76 N
5981658.00 N
5981658.13 N
5981689.27 N
5981778.24 N
5981867.21 N
5981956.18 N
5982045.16 N
5982134.13 N
5982223.10 N
5982312.07 N
5982401.05 N
5982490.02 N
5982578.99 N
5982667.96 N
377452.27 E
377447.36 E
377443.42 E
377436.44 E
377425.09 E
377419.55 E
377405.41 E
377396.80 E
377368.27 E
377334.13 E
377294.52 E
377266.00 E
377265.94 E
377249.96 E
377204.31 E
377158.66 E
377113.01 E
377067.36 E
377021.71 E
376976.07 E
376930.42 E
376884.77 E
376839.12 E
376793.47 E
376747.82 E
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Not1h Slope, Alaska
2681.36 K-1 Marker
2746.20
2776.99 Kuparuk
2826.61
2904.89 LCU
~
2910.96
2998.86
3037.43 Miluveach A
3089.86
3155.97 Alpine D
3183.53
3245.70
3279.41
3377.03
3475.93
3575.60
3640.44
3640.58
3675.58
3775.58
3875.58
3975.58
4075.58
4175.58
4275.58
4375.58
4475.58
4575.58
4675.58
4775.58
Alpine C
TARGET (Heel) Hold 90.17(> inc:
12264.86ft MD, 7079.00ft TVD (11:
FSL, 1370' FEL, SEC 25-T12N-R41
Target- BHL 74 (Heel), 100.00
Radius., Current Target
7" Csg Pt... Drill out6-1t8" Hole:
12265.00ft MD, 7079.0OftTVD
7" Casing
~
DriI/Quest 3.03.02.002
Sperry-Sun Drilling Services
Proposal Report for Alpine CD-2 - Plan: CD2-oS - CD2-DS {wp02}
Your Ref: 4000' Extension from BHL #74 (Geo-PUot Option)
Norlh Slope, Alaska
Alaska Norlh Slope
Measured
Depth
(ft)
Sub-Sea
Depth
(ft)
Vertical
Depth
(ft)
Local Coordinates
Northings Eastings
(ft) (ft)
Global Coordinates
Northings Eastings
(ft) (ft)
Inol.
Azim.
90.172
90.172
90.172
90.172
90.172
13500.00
13600.00
13700.00
13800.00
13900.00
331 .859
331 .859
331 .859
331.859
331.859
7023.29
7022.99
7022.69
7022.39
7022.09
7075.29
7074.99
7074.69
7074.39
7074.09
8130.10 N
8218.28 N
8306.46 N
8394.63 N
8482.81 N
4875.04 E
4827.88 E
4780.71 E
4733.55 E
4686.38 E
5982756.94 N
5982845.91 N
5982934.88 N
5983023.85 N
N
4875.58
4975.58
5075.58
5175.58
5275.57
.-'
14000.00
14100.00
14200.00
14300.00
14400.00
90.172
90.172
90.172
90.172
90.172
331.859
331.859
331.859
331.859
331.859
7021.79
7021.49
7021.19
7020.89
7020.59
7073.79
7073.49
7073.19
7072.89
7072.59
376473.93 E
376428.28 E
376382.63 E
376336.98 E
376291.34 E
0.000
0.000
0.000
0.000
0.000
5375.57
5475.57
5575.57
5675.57
5775.57
14500.00
14600.00
14700.00
14800.00
14900.00
90.172
90.172
90.172
90.172
90.172
331.859
331.859
331.859
331.859
331.859
7020.29
7019.99
7019.69
7019.39
7019.09
5983646.66 N
5983735.63 N
5983824.61 N
5983913.58 N
5984002.55 N
376245.69 E
376200.04 E
376154.39 E
376108.74 E
376063.09 E
0.000
0.000
0.000
0.000
0.000
5875.57
5975.57
6075.57
6175.57
6275.57
<:::)
::x:J
~--
~
iJ:J
15000.00 90.172 331.859
15100.00 90.172 331.859
15200.00 90.172 331.859
15300.00 90.172 331
15400.00 90.17~¢$'j}j:'~~
15500.QQ-,.; 9O;'~,1.2 ,331 :869-
15600.œ;~-';" 90.17? 331.8S9
15700.00, "~.172, "331.859'
15800.00-90:172,331.859
15900.00: 90.172 "331.859
9452.77 N
9540.95 N
9629.13 N
9717.31 N
9805.49 N
4167.57 E
4120.41 E
4073.24 E
4026.08 E
3978.92 E
5984091.52 N
5984180.50 N
5984269.47 N
5984358.44 N
5984447.41 N
376017.44 E
375971.79 E
375926.15 E
375880.50 E
375834.85 E
0.000
0.000
0.000
0.000
0.000
6375.57
6475.57
6575.57
6675.57
6775.57
---...,."
~.2:
1:~
r-
7017.29
7016.99
7016.69
7016.39
7016.09
9893.67 N
9981.84 N
10070.02 N
10158.20 N
10246.38 N
3931.75 E
3884.59 E
3837.42 E
3790.26 E
3743.09 E
7069.29
7068.99
7068.69
7068.39
7068.09
5984536.39 N
5984625.36 N
5984714.33 N
5984803.30 N
5984892.28 N
375789.20 E
375743.55 E
375697.90 E
375652.25 E
375606.60 E
0.000
0.000
0.000
0.000
0.000
6875.57
6975.57
7075.57
7175.57
7275.57
---
10334.56 N
10422.74 N
10510.91 N
10568.21 N
90.172
90.172
90.172
90.172
331.859
331 .859
331.859
331 .859
7015.79
7015.49
7015.19
7015.00
3695.93 E
3648.76 E
3601.60 E
3570.96 E
16000.00
16100.00
16200.00
16264.97
7067.79
7067.49
7067.19
7067.00
5984981.25 N
5985070.22 N
5985159.19 N
5985217.00 N
375560.96 E
375515.31 E
375469.66 E
375440.00 E
0.000
0.000
0.000
0.000
7375.56
7475.56
7575.56
7640.54
TARGET (Original Toe): 16264.971
MD, 7067.0OftTVD (1638' FNL,
2027' FEL, SEC 25- T12N-R4E)
Target- BHL 74 (Toe), 100.00
Radius.. Current Target
10599.09 N
3554.43 E
16300.00 90.172 331.859
7014.89
7066.89
5985248.17 N
375424.01 E
0.000 7675.56
16 January, 2003 - 6:17
Page 70f11
DriI/Quest 3.03.02.002
Sperry-Sun Drilling Services
Proposal Report for Alpine CD-2 - Plan: CD2-D8 - CD2-DS (wp02)
Your Ref: 4000' Extension from SHL #74 (Geo-Pilot Option)
North Slope. Alaska
Alaska North Slops
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings
(ft) (It) (It) (ft) (ft) (ft) (ft)
16400.00 90.172 331 .859 7014.59 7066.59 10687.27 N 3507.27 E 5985337.14 N 7775.56
16500.00 90.172 331.859 7014.29 7066.29 10775.45 N 3460.11 E 5985426.11 N 7875.56
16600.00 90.172 331 .859 7013.99 7065.99 10863.63 N 3412.94 E 5985515.08 N' 7975.56
16700.00 90.172 331.859 7013.69 7065.69 10951.81 N 3365.78 E 5985604.06 N 8075.56
16800.00 90.172 331.859 7013.39 7065.39 11039.98 N 3318.61 E 5 ,q3N 8175.56 "
-"
16900.00 90.172 331.859 7013.09 7065.09 .~N 375150.12 E 0.000 8275.56
17000.00 90.172 331.859 7012.79 7064.79 0.97N 375104.47 E 0.000 8375.56
17100.00 90.172 331.859 7012.49 7064.49 ~5959.95 N 375058.82 E 0.000 8475.56
17200.00 90.172 331 .859 7012.19 7064.19 , 9.'-,,,,~, ",,¿4f='t"S986048.92 N 375013.17 E 0.000 8575.56
17300.00 90.172 331 .859 7011.90 7063.90 ' 2.19); 5986137.89 N 374967.52 E 0.000 8675.56
17400.00 90.172 331.859 7011.60 5986226.86 N 374921.87 E 0.000 8775.56
17500.00 90.172 331.859 7011.30 5986315.84 N 374876.23 E 0.000 8875.56
17600.00 90.172 331 .859 7011.00 5986404.81 N 374830.58 E 0.000 8975.56
C) 17700.00 90.172 331.859 7010.70 5986493.78 N 374784.93 E 0.000 9075.56
17800.00 90.172 331.859 7010.40 5986582.75 N 374739.28 E 0.000 9175.56
-1r'";
~,._p 17900.00 90.172 12009.95 N 2799.80 E 5986671.73 N 374693.63 E 0.000 9275.56
~-.o-.;.__...,J 18000.00 90.172 12098.12 N 2752.64 E 5986760.70 N 374647.98 E 0.000 9375.56
{;.-..) 18100.00 90.172 12186.30 N 2705.47 E 5986849.67 N 374602.33 E 0.000 9475.55
~~--=~.. 18200.00 90.172 12274.48 N 2658.31 E 5986938.64 N 374556.68 E 0.000 9575.55
~.~~.:: 18300.00 90.172 12362.66 N 2611.14 E 5987027.62 N 374511.04 E 0.000 9675.55
:to ~;J ~:~g:.~;;:1(* . 7008.60 7060.60 12450.84 N 2563.98 E 5987116.59 N 374465.39 E 0.000 9775.55
Er"'- 7008.30 7060.30 12539.02 N 2516.81 E 5987205.56 N 374419.74 E 0.000 9875.55
18600.~ -~:;:~~,F~f- 31. 7008.00 7060.00 12627.19 N 2469.65 E 5987294.53 N 374374.09 E 0.000 9975.55 -..-'
18700.00" ~;~f7ii~;j;.,331.859 7007.70 7059.70 12715.37 N 2422.49 E 5987383.51 N 374328.44 E 0.000 10075.55
1880000,' 90.172'·g-:;:.o<331.859 7007.40 7059.40 12803.55 N 2375.32 E 5987472.48 N 374282.79 E 0.000 10175.55
';i}.)
18900.00 90.172 331 .859 7007.10 7059.10 12891.73 N 2328.16 E 5987561.45 N 374237.14 E 0.000 10275.55
19000.00 90.172 331.859 7006.80 7058.80 12979.91 N 2280.99 E 5987650.42 N 374191.49 E 0.000 10375.55
19100.00 90.172 331 .859 7006.50 7058.50 13068.09 N 2233.83 E 5987739.40 N 374145.85 E 0.000 10475.55
19200.00 90.172 331.859 7006.20 7058.20 13156.26 N 2186.66 E 5987828.37 N 374100.20 E 0.000 10575.55
19300.00 90.172 331 .859 7005.90 7057.90 13244.44 N 2139.50 E 5987917.34 N 374054.55 E 0.000 10675.55
19400.00 90.172 331 .859 7005.60 7057.60 13332.62 N 2092.33 E 5988006.31 N 374008.90 E 0.000 10775.55
19500.00 90.172 331.859 7005.30 7057.30 13420.80 N 2045.17 E 5988095.29 N 373963.25 E 0.000 10875.55
19600.00 90.172 331 .859 7005.00 7057.00 13508.98 N 1998.00 E 5988184.26 N 373917.60 E 0.000 10975.55
19700.00 90.172 331.859 7004.70 7056.70 13597.16 N 1950.84 E 5988273.23 N 373871.95 E 0.000 11075.55
19800.00 90.172 331.859 7004.40 7056.40 13685.33 N 1903.67 E 5988362.20 N 373826.30 E 0.000 11175.55
16 January, 2003 - 6:17
Page S of 11
Dri/lQuest 3.03.02.002
<::)
::c
---
!;~:>
--.....
~
~~
:J:~
r-
Sperry-Sun Drilling Services
Proposal Report for Alpine CD-2 - Plan: CD2-D8 - CD2-D8 (Wp02)
Your Ref: 4000' Extension from BHL #74 (Geo-PiIot Option)
Alsska North Slopø
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth 1001. Azim. Depth Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
19900.00 90.172 331.859 7004.10 7056.10 13773.51 N 1856.51 E 5988451.18 N
20000.00 90.172 331.859 7003.80 7055.80 13861.69 N 1809.35 E 5988540.15 N
20100.00 90.172 331.859 7003.50 7055.50 13949.87 N 1762.18 E 5988629.12 N .
20200.00 90.172 331.859 7003.20 7055.20 14038.05 N 1715.02 E 5988718.09 N
20264.97 90.172 331.859 7003.00 7055.00 14095.34 N 1684.37 E 59 N
All data is in Feet (US) unless otherwise stated. Directions and coordinates
Vertical depths are relative to RKB = 52' MSL. Northings and Eastings ar
Global Northings and Eastings are relative to NAD27 Alaska State Plan
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from 1646' FNL, 1554' FEL and cal
Based upon Minimum Curvature type calculati
The Bottom Hole Displacement is 14195.
Comments
M
··ion Coordinates
Northings Eastings
(ft) (ft)
; .'';';~.:
~:-~:;~
';fÖ.OO
200.00
550.00
800.00
2182.45
O.OON
O.OON
16.36 N
37.25 N
498.03 N
0.00
200.00
549.13
795.94
1952.22
O.ooE
O.ooE
13.73 E
46.65 E
575.68 E
2889.58
3422.78
10382.60
12264.86
12265.00
2390.00
2700.16
6481.94
7079.00
7079.00
962.34 E
1264.17 E
5332.80 E
5457.59 E
5457.52 E
896.62 N
1207.75 N
5401.01 N
7040.97 N
7041.10 N
16 January, 2003 - 6:17
Comment
SHL (1646' FNL& 1554' FEL, SEC. 2 - T11N - R4E)
Begin Dir @ 2.0G/100ft: 200.00ft MD, 200.00ftTVD
Increase DLS to 2.5°/100ft: 550.00ft MD, 549. 13ft TVD
IncreaseDLS to 3.0G/100ft: 8OO.00ft MD, 795.94ftTVD
End Dir, Start Sail @ 51.75°: 2182.45ftMD, 1952.22ftTVD
11275.55
11375.55
11475.55
11575.54
11640.51
North Slope$ Alaska
TARGET (PBHL) Total Depth:., '
20264.97ft MD, 7055.00ft TVD "-"
(1890' FSL, 143' FWL, SEC 24-T1~
R4E)
Target - C02-OS (PBHL), 100.00
Radius.
-'
9-5/8" Csg Pt... Allow Build @ 1.00/1ooft (8-112" Hole): 2889.58ft MD, 2390.00ft TVD
End Dir, Start Sail @ 57.09° : 3422.78ft MD, 2700. 16ft TVD
Begin Dir @ 4.00/100ft: 10382.60ft MD, 6481.94ftTVD
TARGET (Heel) Hold 90.17° inc: 12264.86ft MD, 7079.00ftTVD (113' FSL, 1370' FEL, SEC 25-T12N-R4E)
7" Csg Pt... Drill out 6-1/8" Hole: 12265.00ft MD, 7079.00ftTVD
Page 9 of 11
DriJ/Quest 3.03.02.002
C)
:::t:J
~.£..:-:::-"'3a
~
~
~
~
r--
Alaska North Slope
Comments (Continued)
Measured
Depth
(ft)
Sperry-Sun Drilling Services
Proposal Report for Alpine CD-2 - Plan: CD2-D8 - CD2-oS (wp02)
Your Ref: 4000' Extension from BHL #74 (Geo-PíIot Option)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
16264.97
20264.97
Formation Toos
Measured
Depth
(ft)
Vertical
Depth
(ft)
1628.63
2581.06
2907.38
3556.84
5533.38
1552.00
2199.00
2401.00
2773.00
3847.00
5879.36 4035.00
m~:it!),~
9639 ZGt "'''-'-'~07~7'~
1 0842: if~~~*~1~r~7'~~
11082.8z,B} 6823.00
11215.14 6875.00
11338.91 6919.00
11492.95 6967.00
11642.77
11770.84
11865.07
7006.00
7033.00
7049.00
16 January, 2003 - 6:17
7067.00
7055.00
10568.21 N
14095.34 N
Sub-Sea
Depth
(ft)
6665.00
6771.00
6823.00
6867.00
6915.00
6954.00
6981.00
6997.00
Northings
(ft)
2687.83 N
2714.44 N
2824.21 N
4458.59 N
4953.11 N
5728.68 N
5932.69 N
6052.07 N
6167.05 N
6313.32 N
6457.46 N
6580.93 N
6671.31 N
3570.96 E
1684.37 E
.~':..~_ _:.,:c-"
,~;}§~~~.1 {E
·'~~~'-f93.64 E
972.09 E
1342.53 E
2498.00 E
2700.26 E
2726.08 E
2832.59 E
4418.39 E
4898.22 E
5550.20 E
5618.48 E
5641.76 E
5654.07 E
5656.46 E
5645.02 E
5624.58 E
5603.35 E
Comment
Up-Dip Formation Name
Dim.
0.000 359.019 Permafrost
0.000 359.019 C-40
0.000 359.019 C-30
0.000 359.019 C-20
0.000 359.019 K-3 Marker
0.000 359.019 Base K-3 Sand
0.000 359.019 K-2 Marker
0.000 359.019 Base K-2 Cycle
0.000 359.019 Albian-97
0.000 359.019 Albian-96
0.000 359.019 Top HRZ
0.000 359.019 Base HRZ
0.000 359.019 K-1 Marker
0.000 359.019 Kuparuk
0.000 359.019 LCU
0.000 359.019 MiJuveach A
0.000 359.019 Alpine D
0.000 359.019 Alpine C
Page 100t11
North Slope, Alaska
(1638' FNL, 2027' FEL, SEC 25-T12N-R4E)
TVD (1890' FSL, 143' FWL, SEC 24-T12N-R4E)
~
-'
DriI/Quest 3.03.02.002
C
:0
---
~-:>
---
~~
-
~.
J~
r--
Alaska North Slope
CasinQ details
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
<Surface> <Surface> 2889.58
<Surface> <Surface> 12265.00
2390.00
7079.00
Targets associated with this welloath
Target Name
BHL 74 (Heel)
BHL 74 (Toe)
c~~~~~;~
16 January, 2003 - 6:17
Sperry-Sun Drilling Services
Proposal Report for Alpine CD-2 - Plan: CD2-D8 - CD2-oB (wp02)
Your Ref: 4000' Extension from BHL #74 (Geo-Pílot Option)
North Slope, Alaska
Casing Detail
9 5/8" Casing
7" Casing
-0---
T a rg et Entry Coordinates
TVD Northings Eastings Target Target
(ft) (ft) (ft) Shape Type
7079.00 7040.97 N 5457.59 E Circle Current Target
Mean Sea Level/Global Coordinates: 7027.00 5981658.00 N 377266.00 E
Geographical Coordinates: 70° 21' 30.1435" N 150° 59' 48.7657" W
Target Radius: 100.00ft
7067.00 10568.21 N 3570.96 E Circle Current Target
Mean Sea Level/Global Coordinates: 7015.00 5985217.00 N 375440.00 E
Geographical Coordinates: 70° 22\ 04.8473" N 1510 00' 43.8793" W
Target Radius: 100.00ft
o- J
7055.00 14095.34 N 1684.37 E Circle
Mean Sea Level/Global Coordinates: 7003.00 5988775.90 N 373614.05 E
Geographical Coordinates: 70° 22' 39.5455" N 151001' 39.0433" W
Target Radius: 100.00ft
Page 11 of 11
DriI/Quest 3.03.02.002
. '~·II·
COf1OCurlll..lps
ConocoPhillips Alaska, Inc.
North Slope, Alaska
Colville River Unit
Alpine (CD2 Pad)
sp....rty-sUl1
O"RI~.LJ~G . SE;R~IC:-~~~
A Halliburton COmpany
C :::J
(/)
=:t::J :2
N
~:r.:l4i Lt)
r,'J II
~ fD
--~ ~
~ f£
.c
~ ã.
Q)
r-- 0
ëij
0
1::
Q)
>
CD2-08 (wp02)
/ SHL 1.1 G-:;6' i=NL 2.. 1 ~.A' FEL. SEC. 2 - Ti Î N - P.4E)
o -~ -/ Begin Dir @ 2.00/1001t: 2CXlOOft MD. 2OQ.00ft TVD
/ Increase DLS to 2.5</100ft: 550.00ft MD. 549. 13ft TVD
~<t- IncreaseDLS to 3.0·'/100ft : 8(X).00ft MD, 795.94ft rvo
~
6000 -
8
~
II
~
(.)
E
a;
~ 7500 -
en
DrillQuest 3.03.02.005
1500 -
3000 -
4500 -
End Dir. Start Sail @ 51.75°: 2182.45ft MD. 1952.22ft TVD
I' .\,rf>'
"t<;¡.
I
I
I
I
I
I
I
I
I
I
I
I
,
I
I
I
,
9-S'8" Csg Pt ... Allow Build @ 1.0"/100ft
(8-1/2" Hole): 2889.58ft MD. 2390.00It TVD
"'..
i.~
@
Reference is True North
Wel:
Current Well Properties
Plan: CD2-o8
Horizontal Coordinates:
Ref. Global Coordnates :
Ref. Structure:
Ref. Geographicaf Coordnates :
5974711.45 N, 371688.72 E
268.01 N. 33.36 W
70· 20' 2Ó.9101" N. 208· 57' 31.6626" E
1646' FNL & 1554' FEL. SEC. 2 - T11 N - R4E
52.00ft above Mean Sea Level
True North
Feet (US)
RKB 8evalion :
North Reference :
Urifs:
AP RO
¡an
~;J!'
...<;¡.<tli Begin Dir @ 4.0"/1000: 10382.600 MD, 6481.94ftTVD
o
I
1500
I
3000
I
4500
I
6000
Scale: 1 inch = 150011
Eastings(1646' FNL, 1554' FEL)
o
I
6000
I
Scale: 1 inch = 30000
9000
I
3000
I
TARGET (PSHLì Total Depth :
202$4,97ft MD, 7Ó55.00ft TVD
" (1890' FSL, 143' FWL SEG 24- T121\lH4E)
~ CD2-ð8 (PRElL)
70S5.M nv, ]4095.34 N, 1684.37 E
12000 -
T.ARGET (Original Toe) :
TAF!GET (Heel) Hold 9O.iT fic: 16264.97ft MD. 70$7,0{''f¡ TVD
12264.86ft MD, 7079.COft TVD (1 ß3S' FNL, 2027' FEL. SEG 25- T12N-P.4E)
(113'lL' 1370' FEL, SEC 25-T12N-R4Eì
<i!' 7" Csg Pt... Drill out 6-1/8" Hole: 12265.000 MD, 7079.00ft TVD /
\,éŸ' /rj!- ",,? "",<P- "",<P- ~~ «>-~ ",,# .si}-r# ...."'"~
,p'. o{r .,¥" .\IN' .\Ii'" .\<> .',~ .,'f!" ."".''11'' $"'-
~ r ~. ~. ~. ~. F' ~. ~ .
..... COZ..Q8 (WP02)
BElL 74 (TQe)
7067.00 TV!), 10568.11 N, 3570,96 E
TARGET (Or~Jinal Toeì :
162ê4.97ft MD, 7087.00ft TVD
(1638' FNL, 2027' FEL, SEG 25--T12N-R4E)
9000 -
BHL 74 (Hul)
7(J79.00 TV!), 70'¡¡U7 N, 545759 E
7" Casing 1'1.
MD: 12265.0011
TVD: 7079.000
6000 -
I
i
!
3000 - I
I
I T1¡¡):~0Q>
9-5/(1' Casing PI.
. MD: 2889.58ft
I TVD: 2390.00ft
r28(lo·oo.¡ End Oir, Start Sail @ 51.75°: 21S2A5ft MD, 1952,22ft TVD
I ~ ______ IncreaseDLS to 3.0"i1 00ft : 8OO.00ft MD, 795.9411 TVD
! ~ - Increase DLS to 2.5"'1100ft: 5.50.000 MD, 549.13ft TVD
o ~ Beg1i 'i5Fi'2.av100ii72õ0-:-~200.ôõ'ii1V5 - - - - - 0
SHL (1648> FNL &. i E&4' FEL. SEC. 2 - Ti 1 N - R4E;
End Dir, Start Sail @ 57,09":
3422.700 MD. 2700.16ft TVD
9-&8" Csg Pt .., Allow Build @ 1.00/100ft
(8-1f2" Hofe): 2889.58ft MD, 2390.00ft TVD
o
I
3000
I
9000
I
6000
- 12000
'"
'"
c
~ ,-'
o
- 9000 Z
- 6000
š
o
o
C')
II
.I::.
(.)
- 3000 E
a;
~
en
,-'
TARGET (PBHL) Tctal Depth:
202M.97ft MD, 7055.00ft ND
(1890' FSl, 143' FWL, SEG 24-T12N-R4E)
#r#/
.,p."
.
I
7500
I
9000
I
10500
I
12000
MD
(ft)
0.00
200.00
550.00
800.00
1628.63
2182.45
2581.06
2889.58
2907.38
3422.78
3556.84
~ 5533.38
"'--II 5879.36
::I::J 5923.53
~"- 6105.73
('.'~"') 8818.40
--~~..,,, 9639.20
~
""'___ 10382.60
~ 10842.71
r-- 11082.82
11215.14
11338.91
11492.95
11642.78
11770.84
11865.07
12264.86
12265.00
16264.97
20264.97
Inc
(Deg)
0.00
0.00
7.00
11 .48
35.31
51.75
51.75
51.75
51.93
57.09
57.09
57.09
57.09
57.09
57.09
57.09
57.09
57.09
61.99
65.71
68.03
70.34
73.37
76.47
79.20
81.25
90.17
90.17
90.17
90.17
ConocoPhillips Alaska, Inc.
Azlm.
(Deg)
0.00
0.00
40.00
68.29
47.62
44.13
44.13
44.13
44.13
44.14
44.14
44.14
44.14
44.14
44.14
44.14
44.14
44.14
23.52
13.65
8.47
3.78
358. 14
352.82
348.39
345.18
331.86
331.86
331.86
331.86
SSTVD
(ft)
-52.00
148.00
497.13
743.95
1500.00
1900.22
2147.00
2338.00
2349.00
2648.16
2721.00
3795.00
3983.00
4007.00
4106.00
5580.00
6026.00
6429.94
6665.00
6771.00
6823.00
6867.00
6915.00
6954.00
6981.00
6997.00
7027.00
7027.00
7015.00
TVD
(ft)
. - - - - ~ - ..' .... - .
."- .- ','-'-'-" ".-'
NIS
(ft)
.- -- ,-._.--,-_..___.- '0_ "_
.-.- ---- .-. --.--..-
__. '.' .__ __.u" "-"-..".-,
. -. - _ ",."_._. c'_"'~ _.'_". . ;"__ "'"n ,-
. ,-' ·__c- ____,"__.
.-"-.-.-. .-', ... -.-
.- .- -.'.. -
·····_···__.c.·· -
EIW
(ft)
..-,-,--._"... -. ..'--..
"..-0",' ",-0..,'."--"_._....
..-_', ",_-._ C'_", -_"'-_ __-~·O'>·--.·
--.. -.--. _.- . -. .
."'. '_:' ~" -'_"";'-,'," _~, :c-·-': ",_, -<.- ,-.-_;,
.. -.'"-," ",--.--'.',,'
0.00 E
0.00 E
13.73 E
46.65 E
304.15 E
575.68 E
793.64 E
962.34 E
972.09 E
1264.17 E
1342.54 E
2498.00 E
2700.26 E
2726.08 E
2832.59 E
4418.39 E
4898.22 E
5332.80 E
5550.20 E
5618.48 E
5641.76 E
5654.07 E
5656.46 E
5645.02 E
5624.58 E
5603.35 E
5457.59 E
5457.53 E
0.00
200.00
549.13
795.95
1552.00
1952.22
2199.00
2390.00
2401.00
2700.16
2773.00
3847.00
4035.00
4059.00
4158.00
5632.00
6078.00
6481. 94
6717.00
6823.00
6875.00
6919.00
6967.00
7006.00
7033.00
7049.00
.' .", . u'."" _. __,-_..
..'".--'.-. : <."-....--- -,-:..-,..,
, -, .- - .", ., '.---" ,,~
... .__'. . ,-, " _ .__ u "
. - -.'--- ,.
., -:.-.,',,--,',--.
0.00 N
0.00 N
16.36 N
37.25 N
232.21 N
498.03 N
722.72 N
896.62 N
906.67 N
1207.76 N
1288.52 N
2479.38 N
2687.83 N
2714.44 N
2824.21 N
4458.59 N
4953.11 N
5401.01 N
5728.68 N
5932.70 N
6052.07 N
6167.05 N
6313.33 N
6457.46 N
6580.93 N
6671.31 N
7040.97 N
7041.10 N
i 0568.21 N
N
3570.96 E
.__,:_--,- .,- ·---c, ~_- ., --_-.,'
_'._. ":_'·,'·h'_, ._."- .
y
(ft)
F
.. '-.' __ ,.._,____.-.. ___.__ __.d
~:.:(::) r:/f~:.:_~~~~}\~:/:t;~Ç./~t·i~·~·\
5974711.45 N
5974711.45 N
5974727.57 N
5974747.89 N
5974938.42 N
5975199.56 N
5975420.48 N
5975591.47 N
5975601.35 N
5975897.40 N
5975976.81 N
5977147.72 N
5977352.68 N
5977378.84 N
5977486.78 N
5979093.77 N
5979580.02 N
5980020.41 N
5980344.31 N
5980547.13 N
5980666.09 N
5980780.84 N
5980927.06 N
5981071.37 N
5981195.16 N
5981285.90 N
5981658.00 N
5981658.13 N
5985217.00 N
5988775.90 ¡\i
. --'- '..' --- .- - .
-- " ,.- -" - .
~._-'.'---:--_.. ','- ..,..-,'- .-"-, " . . -- -~..
. ,- _"--,·__.'·-._::,."_·,.·c·_·_-..:,
-' ,-.', -. ,- ,_.
~~~. ~"X~~~~ >,
(ft)
.-_.. -, -'.----,.,-.'.--..'--- ,
--.. :.-..--,-.::-..-.'--,-. .,- .--' ,,~-- -,"-- ,.,.---<--:-.-.-~','--:
'-,._--,'_.- .--,-:--,.,"-.,...-----,'-..-, " '
"c.: ._-,-:: -=::." ,:-~._ '::- ,-, :-,:~>','. '.-_'::: ~-:::::,-~__, ~.:: .'-:::-'~ - "c.~:.-
. -,- - _.' ',--. ". -'., _,'__ _". -_. __ - c ~'. - ,-. - _.. -
371688.72 E
371688.72 E
371702.72 E
371736.00 E
371996.80 E
372272.84 E
372494.61 E
372666.26 E
372676.18 E
372973.37 E
373053.11 E
374228.78 E
374434.58 E
374460.85 E
374569.22 E
376182.76 E
376670.98 E
377113.16 E
377336.14 E
377407.90 E
377433.22 E
377447.49 E
377452.39 E
377443.42 E
377425.09 E
377405.41 E
377266.00 E
377265.94 E
376440.00 E
-':_ ·-c ~ õ.-': ; >~ c..:::_:.-·._---:~_'-:::~ '_::' ;_', : ,~:, ,,:,-, :::::-:,~ __~~ _:,.~_,~ .:,~,:,,- ~·_~"o."
a. 00 ~"'Ô.Ò~<'~· ~~SHC:(~646;FNL'~&'~1Š54~F'ÊC~ ,~'
Begin Dir @ 2.0°/1000
Increase DLS to 2.5"/1 o Oft
IncreaseDLS to 3.0"/100ft
Permafrost
End Oir; Start Sail
C-40
9-5/8" Csg Pt ... Allow Build in 8-1/2" Hole
C-30
End Dír; Start Sail
C-20
K-3 Marker
Base K-3 Sand
K-2 Marker
Base K-2 Cycle
Albian-97
Albian-96
Begin Dir
Top HRZ
Base HRZ
K-1 Marker
Kuparuk
LCU
Miluveach A
Alpine D
Alpine C
TARGET (Heel) Hold 90.1(0 ínc
7" Csg Pt ... Drill out 6-1/8" Hole
TARGET (Original Toe)
of
",',,_._,-'--. ..'-..'--',-,,--.,
:,. c: c::~ '.~ -.~ ::-:~>~.'- ":.: <._.:~:.~.: ..~ .~
.... --'-,--. '-.. ,--.
..;'-.-; .':-..- .~...-------,'--' .-.-,
--.-,_.' .'--,.,'.--.,---,-_..--
DLS
CO/1 00ft)
0.00
2.00
2.50
3.00
3.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
0.00
0.00
E
0..00
. ..'-',-.- '-'-,-..' '--,
-.', -, -- -- ,-- ,
:'..---:.'.:-.'.:-.-.-."'";',-.-.--.--'.,,'
,_.' - _c.' '.' _. . _._ '__-,. ~. _. ._
'.,__,~_ ,~ _' .-_ ._.__ . ,C.__, _ _ '.
--- ,- ~.- -. .--- -.- ,- .
-.. --,----.: ,~- ,
V.S.
(ft)
0.00
7.97
10.88
61.58
168.18
263.72
337.66
341.93
469.96
504.29
1010.54
1099.15
1110.47
1157.13
1851.93
2062.15
2252.56
2439.21
2587.02
2681.36
2776.99
2904.89
3037.43
3155.97
3245.70
3640.44
3640.58
7640.54
CD2..08 (wp02)
,',' ,---.' .---'-'-
,,-,~~,~.. -- ,,' .---'-:'.-.-',-.: ,.-,-.>,
'. ., . -".- ~.---, ---- -, -.-.
- --',-' ',-..- -. '._,-
.- . .':. -'- --..~;----"'..'..'.
-,..--,.- '-_._---.-,--.
~~:'~~:··::p::·:::;A~:·:·:~ -:::.::':.--.':. -.'
. '--.-'.-',--.- '-.. --'-,., . ,.
. '."-"->-',.: ._",-~,_., _.-,,~'.-. -,'-:'_.::.-,--.-<:.~_:'"'
--', -- - -- - ---.-,--,
. -'. ---- --"-",-'
Comment
'~
~
')
)
Sperry-Sun
Anticollision Report
\\:,:'1
('omp""YI 'I , .' ·Pr"ijþß'Alaskalric.,I, 't~u.e:" . ,1t~6/200,3
, ~~¡eld:· · ..1 OQlvtllè River Unit '.'1
I. R~t~,reu(:td~ite;' ":.Alpine ÖÙ2 ". ' " ' ' "t~~ö¡\dj~at~<N~~Ú~ctt'~~~I¡~!", ",W~I: Plèq: q02~®~1'.rti~ NOrth,
U:~t~..~~¡tc(i \\r't1t~. " P'~(1: Cp2~O~ . 'Vert:ical (1Vi» R~~~rel~e,:.: "52~ MSl:.5¿.O" '., ',':' .'
R~førliItC~ ~\'e~pa~"-:: 9D2~~~ " . " .. "''', ",,' ~~:, ,Qr~Ölê ' :
.NQ GLOBAL SCAN: Using user defined selection & !!'-'an criteria Reference: Principal Plan & PLANNED PROGRAM
Interpolatiun M.o. th()d: . ~Pi .. }ntcryaJ;,. ßO.QOOft . Error MOd'. ·ISCWSA SlIIpse . . .. .. .. .
. Depth :Q.angt)· . 36 100 to ~0265®1 ft· . . . . ... " ... . . .... ..:.:....'......',..:.........:,·.::.~~.·.·r.:.~."o·:...~.·..··.s,.·..~lt...li~. :~:.:e::.:··'... '.!. :....:.:.·..··.r.·~..tl·I~,.pyp."'::y..",".il1...:c:·.~as:ør.I·~.nNg:þ.r.l.h.i.··.::. ....;.:..... .'
M~~~It~~i.:ki9i3òJf ',' ·Yi.:i;;;::?i " . ... ._ ~.o T
..'.., ¡...:..~,·.'.....~.'.~h....r,~.·.¡.n,·..:~~:'.1·..tr..o·~....~..o:...1.~,....·~......·.:.·..·.·..........,1.....\..'1[.·.r.ò.t:...·.·,~.·.:...t..·.··.:I.:.~...·.'.OO:.....fl....t,·..~··..joO.....:2...·.or....··.·o..·.)...'..·.C.:.':fi...~.:...', ~~~.~~.L':·\.·/·.······ .,.........:;......"....:.,...,..............,...,..:...:,......,...... :¥~~..:i.·. ;.. 'ii~~~? ". ·····@'i;./:.·
13ovOO" .' O· ·00 202ùVV65.90:1:··:;':::P~Jlaan~nn·'éed: ·'·~~.,.:c8DD·~~0688;>·((··"wpWióo·22i))::VV·::9~······:i·, :::,'1 :··:.'::Ç'·M·.':· ßw·..:·-.:.~'··.·D..··.···.:.y...:.'. A,:F··"·O.:R·. -. SA·.··.·. SK·..·...·....:.·.·~...:.:A·:.·...·..··z·..:.·.:$·c:·.~..:.·.·:'C'.M:.'. ~,.·..:·.m':'·':Dø.··.+r.:.a.:,:··.:F:b.:·..~..\·SØd..I:...A··..··. ·.:.·~.·.··....~:·.·.i^'.j. ø.·.·...........'$··.¡...nc.·..nc'.¡.·..·..:·.:,.:..··.··.ø..·.....oo.·.·.:..:··...·...·..·.':1:·..,:.·..........·............::.\.:.::. .::.;.;:.:. ":<::'I~i' . .
~~ T - ~v ~ ¥v n r. ~~ ~::i.::;::·:i::;::::::·::::\:>·; .':'
. ',:: .' ;, ':'." ,','. ',:,,: ''', ':, \',':' (', ':': < ., ":::' /:':': ":,'" ,: '. " . ' ~, " .
":' '1'\'
...;' ,I
I ," \
III "
. .. "thne:, QØ:5f;,16,'·
, 01/
.Ç.a~i~~~o~n~~. .
,1 . \1
,:'1\tp,
'ff .'
2689.576
12266.000
20265.900
" : : : :,:, ".',"',: ',',' ~, :.: " :: '-:': :':': ,'.:, ", :.; ':.: ~
. ,',J " "" ,',
. ',J)ia~peter, '. ':
In', .
"A
9.625
7.000
6.125
: '.:>';':':' },'.,'.'< .:.,':. :,: ,<:.,':':':'::
.... '. ti~i~ 'SiZt ..
I. :..:", ". "io~ .'1. '.'
12.250
8.500
6.125
,I " '. ~\ .'\' I
95/8"
7"
6~ 1/8" Open Hole
~i/GfNJt.
)
Sperry-Sun
Anticollision Report
')
, ('o..,puriy:' " ,
'f'¡eM:" "
, Rderence'S,te:
, R;cte~ç~ç¢\~·e.ii ,'. "
~ê(~rl!bc~ ~tI,JJpatb:,
':' ,Ct'r~'Ct:r·' No:.~' ',. AtIo'''+able
", J)jsta~çe ;\,re.*" .)(I~j"lion','
: ":' :ft"'"'",',:,:1t.,, :,,'/,,', ':ft, :,';',,";, I:, ,:
101.158 6.285 94.874 Pass: Major Risk
107.256 17.228 90.123 Pass: Major Risk
107.256 17.337 90.013 Pass: Major Risk
221.11!S 6.244 214.871 Pass; Major RisK,,:
183.753 156.126 35.978 Pass: Major Risk,
, ·1..
:,i/GINAL
WEU.PAlliDET.-\JLS
CD2-COS
Rig: fuyaD 19
Ref. Dam¡: SZMSL 520C01t
V.S>-<Iiœ on.;n ~t =fvD
Angè +N!~
33!9(f OJ))) O.cro O.rro
COMPA,'oY DETAILS
~Ioc,
K!JpW<.
C3bú;1iœ M«OOd: Mìimm ÜK\.UIr.
=:= ~~~-
w-=~= =-~~~ttìng
ANTI-COLLISlÛi"l SE'ITINGS
Interval: 50.000
To: 20265.901
Reference: Plan: CD2-08 (v.y02)
Interpolation Meiliod:MD
Depth Rangce From: 36.100
Maximum Range: 2222.980
ToMD
200
400
600
800
1000
1500
2000
3000
4000
5000
6000
8000
10000
12000
14000
16000
18'
20. .
22~"
-..-"
Colour
.90
From
o
200
400
600
800
1000
1500
2000
3000
4000
5000
6000
8000
1OCIQO
12000
14000
16000
18000
20000
ToMD
200
400
600
800
1000
1500
2000
3000
4000
5000
~~ -W
t~ggg --40
14000
16000
18000
20000 Prelim: CD2-06 (CD2-06)
22000 -30
2
Prelim: CO2-a: (CO2-OS)
-10
--40
-W
--30
-10
-20
-0
Colour
90
From
o
200
400
600
800
1000
1500
2000
3000
4000
5000
6000
8000
10000
12000
14000
16000
18000
20000
WElLDETAŒ.S
Naœ +N!-S _Fl-W NoJtiDg P-'S1ing UIitW. Longjm!. SbI
PIu1: CDl-08 fiJ.657 ·11.714 5974711.45 371688.12 7tJ'J"œ.91cti 151oarlS.337W WA
SURVEY PROGRA..\f
Depth Fro Depth To SurveyIP1an
36.100 1300.000 Planned: CD2-08 (wpJ2) V9
1300.000 20265.901 Planned: CD2-Og (wp02)V9
=i&1
-75
(FBI)
CD2-08 (wp02)
.....- Approved Plan ---
Target
Travelling Cylinder Azimuth (1F0+AZI) [deg] vs Centre to Centre Separation [2Oft/in]
BHL 74 (Heel)
BHL 74 (foe)
1Face
0.00
0.00
40.00
60.00
330.97
0.00
0.00
22.91
0.00
-80.00
0.00
0.00
Centre Separation [50ft/in]
VSec
0.000
0.000
7.965
10.882
168.177
337.658
469.881
469.973
3640.730
7641.149
DLeg
0.00
0.00
2.00
2.50
3.00
0.00
1.00
3.00
0.00
4.00
0.00
0.00
vs Centre to
+E/-W
0.000
0.000
13.726
46.653
575.678
962.340
1263.998
1264.209
5333.241
5458.041
3571.255
1684.676
[deg]
+N/-S
0.000
0.000
16.358
37.247
498.033
896.619
1207.580
1207.798
5401.578
7041.541
10569.061
14096.195
(TFO+AZI)
TVD
36.100
200.000
549.130
795.945
1952.222
2390.000
2700.000
2700.197
6482.002
7079.000
7067.000
7055.001
Azimuth
Azi
0.00
0.00
40.00
68.29
44.13
44.13
44.13
44.14
44.14
33 1.86
331.86
331.86
Travelling Cylinder
Inc
0.00
0.00
7.00
11.47
51.75
51.75
57.08
57.09
57.09
90.17
90.17
90.17
.MD
36.100
200.000
550.000
800.000
2182.452
2889.578
3422.493
3422.856
10383.234
12265.463
16265.901
20265.901
!
!
I ~5 '!
?'
(j
( .. ?
O t:>--.....
'I .-ó27A '
~---" 10 d
.~" ~ t¡-1
ø .....;
~45~J
_ .J' ~
_ r.:
,~ Q¡
~~
i~O
-75
-100
-104
See
1
2
3
4
5
6
7
8
9
10
11
12
')
')
WEILDBTAns
¡
, i ¡ ¡ I I I
I I I' t' ~± i': Ii! I': I I
15237~' - -- -:-- < - ~ -ri:m~(;=-£ ': - - ,--. . . ~ . . . ~
: < I ,/ 1:6-118"i~~lel : I : ConocoPhllbps:
I I ' ,'>/; .1 ; I I '::iii,:::J,',i":',":,'.}.'I:":,.,.:':,.,...,,!.¡:,,il,t:""!'II"":::'::II'l);""I~::""I'II,':.,:,J
t3967-+-~ +-1- ~ - t--< ~ + · ~$ð'mfjll'!lì¡:~II;;!II,}<¡
I : I .. I' .~!;¡if¡~;¡~:!;:j!::;,;~'i;fiJ:,(!,I¡i~!!!,f'~ii¡:~2;!;j';f
I
I 'I I !
·i· :···..1
I I: I
, I ~ I : 'I Circles of
~j¡_ :___ : __ __jl_ ~I320~~adiUS
i::.:-.:-!j < . I
~ - < I I . I I I
..c:::
i lOt5~- --¡~ +-:1 :2~lLCD2_~3)1ttL--~ I c:I±:~~j J- ~ i ~
8888--':·-......-- ...._..1.__._.. ....1,:,,____... L__~ ' _...._.._.~ ._1..... ,......J. ._____.
-'...i...·-
I I I
I I I
I
-- --~ --r -...--
/) SDt-3t (CDt-31) I I
,
~Î-
I
I
-1-
Nan"
Plan: Cln·08
(fMS7
+NI··S +F!I·W N:>r1hln¡¡
-8.714 '914'111.45
n..rh)g
Ultitud~
Lougtll10 Slot
3'11688.72 7Q'20'20,9ION 151'02'28.337W NlA
'I
12698--- i,·
I
I
.;--......\. _....:._--
I
2540
6349
7619
West(-)Æast(+) [ft]
: ;' ,I G Uti l' L
)
)
G. C. Alvord
Alpine Team Leader
Drilling & Wells
ConocóPhillips
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-265-6120
January 27, 2003
Commissioner Cammy Oechsli Taylor
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Su bject: Revised Permit to Drill for C02-OS
Dear Commissioner:
ConocoPhillips Alaska, Inc. per 20 AAC 25.015(b)(1) - change of bottom hole /
location more than 500' laterally in approved Permit to Drill (202-250) submits the
attached revised Permit to Drill along with the $100 fee.
ConocoPhillips plans to extend the horizontal length of the Alpine well C02-0B
(injector) up to an additional 4000' beyond the currently permitted depth. Length of
the extension will depend on sand quality and thickness. All other pertinent well /'
information remains the same. Attached is the revised directional plan, showing the
4000' extension and a letter from the land department to the Working Interest
Owners of the Colville River Unit.
The C02-OS is currently drilling at 11,900' to a planned intermediate 7" casing depth
of 12,265'. Estimated date to begin drilling the horizontal Alpine C section is Friday, /'
January 31.
If you have any questions or require further information, please contact Brian Noel at
265-6979 or me at 265-6120.
Sincerely,
/1 ~. O<-Z
G. C. Alvord
Alpine Team Leader
CP AI Ori lIing
RrCL~'IED"
.Î t·,~.tl ~ .
JAN 2 8 2005
Alaska Oil & c~c~s
Ci~!i-;-¡m¡ss¡or
GCAlskad
, '. ¡
I
~
,-
S. K. ALLSUP-DRAKE
PHilLIPS PETROLEUM COMPANY
À~C~~~~~ 99501 . _~^TE2E>~Kø.(YZièf{¿;14~j1
~~~~~6~E '>1/tf¡;;- pf .I!ÇtfSCAlt4(J$.(r¿ ..···1$ rOO. 00
~ (¿J~ 1_I¡N)~¿¿.-r5...· IJl..·....·.··.··.. ~{....~....__________.H.............. .. A ___
{/~ t~ 11(. DOLLARS<W '=.."'-*... _
, .'1h4@¡¡:?'¡¡~~"", {1¡.~
f
1 024 ~
~
~
i
~
--
1
ì ~
I M~ CHASE ~"~::::=::::;:o~" væ:;¡:::rn)t¡, -ù1 .. i
l -:0 ~ ~ ~oo ~ 1.1.-: 2 ~80000t. 2 7 257u-¡'021. .. .... ... . ... ... ....j
i~-_~_~""'~~·~.~~~~~~~~5-_h,\_~_-/.._ _'""-= .__.o,_.æ?-,~c--<.--.~~..._..-.~~~_.'!~.;L;-__,:?'I~~;,rt~~~,.. ~ ..".;.-'O;~Â~~_t!._. ll.,Jj£__~-""~'F'<,<-~~~,~H~~::--~
)
)
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERlP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME
PTD#
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MUL TI
LATERAL
(If API number
last two (2) digits
are between 60-69)
"CLUE"
The permit is for a new wellbore segment of
existing well
Permit No, API No.
Production should continue to be reported as
a function' of the original API number stated
above.
HOLE In accordance with 20 AAC 25.005(1), all
records, data and logs acquired for the' pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (50
70/80) from records, data and logs acquired
for well (name on permit).
PILOT
(PH)
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07/10/02
ajody\templates
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumes the liability of any
protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
~r=®c-?L
~ _WL 1:
~
)
f ~~~~~~~
FRANK H. MURKOWSKI, GOVERNOR
6
A.I¡ASKA OIL AND GAS
CONSERVATION COMMISSION
Chip Alvord
Drilling Team Leader
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage AK 99510
333 W. "JTH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re: Colville River Unit CD2-08
ConocoPhillips Alaska, Inc.
Permit No: 202-250
Surface Location: 1646' FNL, 1554' FEL, Sec. 2, TI1N, R4E, UM
Bottomhole Location: 1638' FNL, 2027' FWL, Sec. 25, TI2N, R4E, UM
Dear Mr. Alvord:
Enclosed is the approved application for permit to drill the above referenced development well.
This permit to drill does not exempt you from obtaining additional permits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of, the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
~?-~
Michael L. Bill
Commissioner
BY ORDER OF THE COMMISSION
DATED this.t!.^day of January, 2003
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
)
)
vJ6A- i /7.-/"~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
1a. Type of Work Drill X Redrill 1b. Type of Well Exploratory Stratigraphic Test Development 011
Re-Entry Deepen Service x Development Gas Single Zone Multiple Zone
2. Name of Operator /J ~P¡-J 5. Datum Elevation (DF or KB) 10. Field and Pool
Phillips Alaska; Inc. ~ Y/):( /.'tJ.J tJi.HsVt}~. DF 52' feet Colville River Field
3. Address 6. Property Designation Alpine Oil Pool
P. O. Box 100360, Anchorage, AK 99510-0360 ADL 380075,387212,380096
4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 MC 25.025)
1646'FNL, 1554'FEL, Sec. 2, T11N, R4E,UM
At target (=7" casing point)
113' FSL, 1370' FEL, Sec. 25 T12N, R4E, UM
At total depth
1638' FNL, 2027' FWL, Sec. 25 T12N, R4E, UM
12. Distance to nearest 13. Distance to nearest well
Property line CD2-13
Crosses fr 380075, to Feet 24.6' at 950' MD Feet
387212, to 380096
16. To be completed for deviated wells
Kickoff depth 200 feet Maximum hole angle 90.2°
Colville River Unit
8. Well numbe/,
CD2-08
9. Approximate spud date
01/08/2003 /
14. Number of acres in property
Statewide
Number
#59-52-180
Amount
$200,000
15. Proposed depth (MD and 1VD)
i t;.ö'l~r( ,4':¡:071J-Mð- ¡,..tG Æ
'1()~ 1" 7107' Mer- feet
2495
17. Anticipated Pressure (see 20 AAC 25.035(e)(2))
./
Maximum surface 2526 pslg At total depth (1VD)
18. Casing program Settin...q Depth
size Specifications Top Bottom
Hole Casinç¡ Weight Grade Couplinç¡ Length MD TVD MD TVD
42" 16" 62.5# H-40 Weld 77' 37' 37' 1141 114'
12.25" 9.625" 36# J-55 BTC 2853' 37' 37' 2890' 2390'
8.5"
N/A
7"
4.5"
26#
12.6#
L-80
L-80
BTC-M
IBT mod
12228'
11000
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet
true vertical feet
Effective depth:
measured
true vertical
feet
feet
Casing
Length
Size
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
measured
true vertical
37'
32'
37'
32'
12265'
11032'
71421
6958'
3174 at psig
7015'
TVD.SS
Quantity of cement
(include staç¡e data)
Pre-installed
529 Sx Arcticset III L &
230 Sx Class G
296 Sx Class G
Tubing
Junk (measured)
Cemented Rt€ H \ E \)ue Vertical dept~
DEC 2.0 2002
, 1i~ Ou & Gas Gons. commission
MÐ.Si\fo\ - Anchorage
Diverter Sketch
Seabed report
20. Attachments Filing fee X Property plat BOP Sketch
Drilling fluid program X Time vs depth plot Refraction analysis
21. I hereby certify that the foregoing is true and correct to the best of my knowledge -^
--;? ~/I r Ch: r f\ \\r<).,.J
Signed ~... I J-' (~ -toy- Title _ Drilling Team Leader
Commission Use Only
Permit Number I API number I Approval date ~ Il ~ì 1'1 I See cover I.etter for
.2 0 ,- 2..5' <::> 50- /0 _? - 2.. c:J '771.2- I F J Other requirements
Conditions of approval Samples required Yes ~ Mud log ~equired Yes ð
Hydrogen sulfide measures Yes ~ Directional survey required ('Yëf) No
Required working pressure for BOPE 2M 3M 5M 10M 15M 'T.¿s+- ~ PE ro 51000 {Js,' ",..t I~t I,.(;t..UJ'l
Other: p¿,y' ~<ìAA-c 2.S,OS~ (A.. )(2-) £kVe;ýtt'-ý ~ ~~~t 1{,l)cµ Ve..J, I Nlr.T) t~L t 1.. ¡'~.LJ; 1-(,,(
p~-v 2-12 A/\L LS ¡ '-i \ 'L(b) 17""'¡L~.~ d.('~',)~ ·rebVL~l"'(.J'YLe'''L"\ ~rK.A. V~tJ· ¡ (J ~ ~~ L<..·lly,.,L d. .
) BY by order of '/ I 3
Approved by ORtGiNAL S'GNED Commissioner the commission Date \ [(,'0
M L. BiD ) R ; C~ I'; ! i 1.
Plugs (measured)
Drilling program X
20 MC 25.050 requirements X
Date /2/19/0 '-
')
Form 10-401 Rev. 7·24·89
II) , G .t ;~ , ~
, ,,1 & IrJ¡4,-
Submit in triplicate
)
)
CD2-08 Drilling Hazards Summary
(to be posted in Rig Floor Doghouse Prior to Spud)
(See Well Plan Attachment: Detailed Risk Information for further discussion of these risks)
,12-1/411 Hole 19-5/8" Casina Interval
Event Risk Level
Conductor Broach Low
Well Collision medium
GMH~~~ ~w
Running Sands and Gravel
Low
Abnormal Pressure in
Surface Formations
>2000' TVD
Lost Circulation
Low
Low
,8-1/2" Hole /7" Casina Interval
Event Risk Level
Abnormal Pressure in low
Surface Formations
>2000' TVD
Lost circulation Low
Hole swabbing on trips
Moderate
Abnormal Reservoir
Pressure
low
Hydrogen Sulfide gas
Low
Mitigation Strateqy
Monitor cellar continuously durinQ interval.
Gyro single shots, traveling cylinder diagrams
Monitor well at base of permafrost, increased mud
weight, decreased mud viscosity, increased
circulating times, controlled drilling rates, low mud
temperatures
Maintain planned mud parameters, Increase mud
weight, use weighted sweeps.
Increased mud weight
./
Reduced pump rates, mud rheology, lost circulation
material, use of low density cement slurries
Mitigation Strateqy
BOPE drills, Keep mud weight above 10.4 ppg.
Check for flow during connections and if needed,
increase mud weight.
Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECD) monitoring,
mud rheoloQY, lost circulation material
Reduced trip speeds, mud properties, proper hole /
filling, pumping out of hole, real time equivalent
circulating density (ECO) monitoring, weighted
sweeps.
Well control drills, increased mud weight. No
mapped faults occur within 700' of the planned
well bore.
H2S drills, detection systems, alarms, standard well
control practices, mud scavenQers
6-1/8" Hole / Horizontal Production Hole
Event Risk Level
Lost circulation moderate
Hole swabbing on trips
Moderate
Abnormal Reservoir
Pressure
Medium
Hydrogen Sulfide gas
Low
Mitigation Strateqy
Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECD) monitoring,
mud rheoloQY, lost circulation material
Reduced trip speeds, Pump out to 7' shoe, mud
properties, proper hole filling, pumping out of hole,
real time equivalent circulating density (ECO)
monitorinQ, weighted sweeps.
BOPE drills, Keep mud weight above 9.0 ppg.
Check for flow during connections and if needed,
increase mud weight. Well control drills, increased
mud weiQht.
H2S drills, detection systems, alarms, standard well
control practices, mud scavengers
/
JR ' I' ~ ~ , (" I
\ .~ '; ,', ~ of! I
, \A 4 Ii 'i/' 'j ],.
)
Alpine: CD2-08
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
16.
17.
Procedure
Move on Doyon 19.
/
Drill 12- %" hole to the surface casing point as per the directional plan.
Run and cement 9-5/8" surfac§) casing. /
/ )
Install and test BOPE to,500Q;þsi.
t./
Pressure test casing to 2500 psi.
Drill out 20' of new hole. Perform leak off test.
Pick up and run in hole with 8-1/2" drilling BHA.
/'
Drill8-Y2" hole to intermediate casing point in the Alpine Sands. (LWD Program: GR/RES/PWD)
/
Run and cement 7" casing as per program. Top of cement> 1034 feet MD above Alpine reservoir. Carry
out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to the
casing shoe. Freeze protect casing annulus and casing.
BOPE test to 5000 psi. /
/
Run drilling assembly. Pressure test casing to 3500 psi. Drill out and perform formation integrity test to
12.5 ppg EMW. Minimum acceptable leak off for drilling ahead is 11.5 ppg EMW.
/;/'
,/
Drill 6-1/8" horizontal section to well TD (LWD Program: GR/RES/PWD).
Circulate the hole clean and pull out of hole.
Run 4-~, 12.6#, L-80 tubing with DB nipple, gas lift mandrels, and packer. Land hanger.
/
18. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP.
19. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check.
20. Circulate tubing to diesel and install freeze protection in the annulus.
/
21. Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi 130 mins.
22. Set BPV and secure well. Move rig off.
O i'~ '. ....' "'''\ ," " M .,
I!,' , ¡~ i
i:" i .,', ~,' ,: I .'" ,'"" ¡ 4
I Î , ~¿ J Ii '~Ii ~ 1-
)
)
Well Proxlmltv Risks:
Directional drilling / collision avoidance information as required by 20 l~CC 25.050 (b) is provided in /
following attachments. CD2-13 will be the closest well to C02-08. \l\Iell separation is 24.6 ft at 950 ft MD.
Accounting for survey uncertaintYr the ellipse to ellipse separation is 7.3 it at 950 ft MD.
Drilling Area Risks:
There are no high-risk events (e.g. over-pressures zones) anticipated. /"
Lost circulation: Faulting within the Alpine reservoir section is considered the most likely cause of lost
circulation. Standard LCM material has proved effective in dealing with lost circulation in previous
development wells.
Additional care and attention will be given to the higher potential of inducing a kick when drilling
horizontally as opposed to vertically. Good drilling practices will be stressed to minimize the potential of
taking swabbed kicks.
Annular Pumølng Oøerations:
Incidental fluids developed from drilling operations on well CD2-08 will be injected into a permitted annulus
on CD2 pad or the class 2 disposal well on CD1 pad.
The CD2-08 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze
protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Alpine reservoir and
there will be 500' of cement fill above thêlõP»f the Alpine as per regulations.
,,'iI~.l
We request that CD2-08 be"r,permitt,.ßG"'fôr annular pumping of fluids occurring as a result of drilling
operations, per regulation 2õ7}iAG--2Þ;080. As stated above, any zones containing significant hydrocarbons
will be isolated prior to initiãt1ng-'ãnnular pumping. There will be no USDW's open below the shoe or
potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional
drilling plan for other formation markers in this well.
Surface casing will be set near the below the base of the Schrader Bluff Formation (C-40). These 300- J'
400' thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in
other areas.
The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl ./
without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of
12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure
of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by:
Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi
= (12.0 ppg) * (0.052) * (2390') + 1,500 psi
= 2,990 psi
Pore Pressure = 1,081 psi
Therefore Differential = 2991 - 1081 = 1910 psi. /
The internal casing pressure is conservative, since frictional losses while pumping have not been taken
into consideration. The surface and intermediate casing strings exposed to the annular pumping
operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table:
Wt Connection 850/0 of 85% of
OD (ppf) Grade Range Type Collapse Collapse Burst Burst
9-5/8" 36 J-55 3 BTC 2,020 psi 1,717 psi 3,520 psi 2.992 øsl ./
7" 26 L-80 3 BTC-Mod 5,410 psi 4.599 øsi 7,240 psi 6,154 psi
vi
J ¡""C''> "~ /'~e ~ 1 A
Î1ll1 i i:~/l~ ~
C02-OS
DRilLING FLUID PROGRAM
Density
PV
YP
Funnel Viscosity
I nitial Gels
10 minute gels
API Filtrate
H PHT Fluid Loss at
160
PH
KCL
Surface Hole:
)
SPUD to Intermediate hole to 7" Production Hole
9-5/8"surface casing casing point - 8 %" Section - 6 1/8"
point -12~" I 9.6 - 9.8 ppg /' 9.0-9.3 ppg /
8.8 - 9.6 ppg
10 - 25 10-15
20 - 60 15 - 25 25 - 30
100 - 200
4-8 10-15
<18 12 - 20
NC - 10 cc 130 min 4 - 12 cc/30 min (drilling)
12 - 14 cc/30 min
8.5-9.0 9.0 -10.0 9.0- 9.5
60/0
A standard high viscosity fresh water 1 gel spud mud is recommended for the surface interval. Keep
flowline viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing.
Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary.
Intermediate Hole Section:
Fresh water gel 1 polymer mud system. Ensure good hole cleaning by pumping regular sweeps and
maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is
penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material.
Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all
be important in maintaining wellbore stability.
Production Hole Section:
The horizontal production interval will be drilled with aM-I Flo-Pro drill-in fluid. The base fluid will consist
of 6% KCI, with ± 30PPB calcium carbonate bridging material to minimize formation damage. Flo-Vis
Polymer and Dual-Flo starch will be used for viscosity and fluid loss control respectively.
J n ~ ,~ ~ ,~' G ~ L
EW'/;1 .; ,':;:, " .:' 'I, :
, I M ~~ § j\ti ~",~, ..
'I
)
'\
)
CD2-08
PRESSURE INFORMATION AND CASING DESIGN
(per 20 ACC 25.005 ( c) (3,4) and as required in 20 ACC 25.035 (d) (2))
The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well :
Csg Setting Fracture Pore
Casing Size Depth Gradient pressure ASP Drilling
(in) MD/TVD(ft) (Ibs. I gal) (psi) (psi)
16 114/114 10.9 52 53
9 5/8 2890 I 2390 14.5 1081 1566
7" 12265 I 7079 16.0 3204 2495
N/A 16265 I 7067 16.0 3198 N/A
. NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 5000 psi.
PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP)
ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas
gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as
follows:
1) ASP = [(FG x 0.052) - 0.1]0
Where: ASP = Anticipated Surface pressure in psi
FG = Fracture gradient at the casing seat in Ib/gal
0.052 = Conversion from Ib.lgal to psi/ft
0.1 = Gas gradient in psi/ft
0= true Vertical depth of casing seat in ft RKB
OR
2) ASP = FPP - (0.1 x D)
Where; FPP = Formation Pore Pressure at the next casing point
ASP CALCULATIONS
1. Drilling below conductor casing (16")
ASP = [(FG x 0.052) - 0.1] 0
= [(10.9 x 0.052) - 0.1] x 114 = 53 psi
OR
ASP = FPP - (0.1 x D) /
= 1081 - (0.1 x 2390') = 842 psi
2. Drilling below surface casing (95/8")
ASP = [(FG x 0.052) - 0.1] 0
= [(14.5 x 0.052) - 0.1] x 2390 = 1563 psi
OR
ASP = FPP - (0.1 x D) /
= 3204 - (0.1 x 7079') = 2495 psi
3. Drilling below intermediate casing (7')
ASP = FPP - (0.1 x D)
= 3198 - (0.1 x 7067') = 2491 psi
O,~jJ/'ìJ'" f. I
h¡l;liJj/{L.
')
)
Colville River Field
CD2-08 Injection Well Completion Plan
~¡,::ji~¡:l
"r""
16" Conductor to 114'
Updated 12/1 9/02
.
4-1/2" Camco DS Nipple (3.812')
at 2000' TVD = 2260' M D
9-5/8" 36 ppf J-55 STC
Surface Casing
@ 2890' MD /2390' TVD
cemented to surface
Packer Fluid mix:
9.? ppg KCI Brine
.with ?OOO' TVD diesel ca,p
4-1/2" 12.6 ppf L-80 1ST M
tubing run with Jet Lube Run'n'Seal
pipe dope
Tubing suspended with diesel
Completion MQ. DlJ:l
Tubing Hanger 32' 32'
4-1/2", 12.6#/ft, 1ST-Mod Tubing
Camco DB6 nipple 2260' 2000'
4-1/2", 12.6#/ft, IBT-Mod Tubing
Camco KBG2- GLM (3.909" ID) 10820' 6706'
4-1/2", 12.6#/ft, 1ST-Mod Tubing (2)
Baker 53 Packer wI millout extension 10920' 6752'
4-1/2", 12.6#/ft, IBT-Mod Tubing (2)
HES "XN" (3.725")-64.7° inc 11 020' 6796'
4-1/2", 12.6#/ft, IBT-Mod 10' pup joint
WEG 11032' 6801'
TOC @ +1· 10446' MD /6516' TVD
(>1422,\MD a~é top Alpine)
\ ..-
\.......
Camco KBG-2 GLM (3.909" DRIFT ID)
wI dummy
Baker 53 Packer WI millout extension at +1- 10920' MD <300'
TVD from top of Alpine
æ?'tb at
626 MD I
7'TVD
Top Alpine at 11868' MD / 7049' TVD
~
7" 26 ppf L-80 BTC Mod
Production Casing @ 12265' MD / 7079' TVD @+/- 90°
J R) ~! i~ ~~';\ L
" '~/l~¡¡,~¡r,
")
Alpine. CD2-08 Well Cementing Requirements
9 5/8" Surface Casine: run to 2890' MD / 2390' TVD
Cement from 2890' MD to 2390' (500' of fill) with Class G + Adds @ 15.8 PPG, and from 2621' to surface with
Arctic Set Lite 3. Assume 300% excess annular volume in permafrost and 50% excess below the permafrost
(1566' MD).
Lead slurry:
System:
(2390'-1566') X 0.3132 ft3/ft X 1.5 (50% excess) = 387.1 ft3 below permafrost
1566' X 0.3132 fe/ft X 4 (300% excess) = 1961.9 fe above permafrost
Total volume = 387.1 + 1961.9 = 2349.0 fe => 529 Sx @ 4.44 felsk
Æ~ ArcticSet Lite 3 @ 10.7 PPG yieldin- a3/sk, Class G + 30% 0053 thixotropic
~~ve, 0,6% D046 antifoamer, 1.5% 0079 ex~l~% SOOI accelerator, 50% DI24 extender
-and 9% BWOW1 D044 fTeeze suppressant
516' X 0.3132 ft3/ft X 1.5 (50% excess) = 234.9 ft3 annular volume
80' X 0.4341 fe/ft = 34.7 fe shoe joint volume
Total volume = 234.9 + 34.7 = 269.6 fe => 230 Sx @ 1.17 ft3/sk
~,,' Sx Clas~, ' ,(}.2% D046 antifoamer, 0.3% D065 dispersant and 1 % SOOI accelerator@15.8
- PO yieldin l.tifelsk
" ~.
7" Intermediate Casine: run to 12265' MD /7079' TVD
Cement from 12265'MD to +/- 10446' MD (minimum 1422' MD above top of Alpine formation) with Class G +
adds @ 15.8 PPG. Assume 40% excess annular volume.
Tail slurry:
System:
Slurry:
System:
(12265' - 10446') X 0.1268 fe/ft X 1.4 (40% excess) = 322.9 ft3 annular vol.
80' X 0.2148 felft = 17.2 fe shoe joint volume
Total volume = 322.9 + 17.2 = 340.1 fë => 296 Sx @ 1.15 felsk
iisx Class G + 0.2% D046 antifoamer, 0.25% ~6~sant, 0,25% D800 retarder and
f:r8% D167 fluid loss additive @ 15.8 PPG yieldin~ _t31 '-t:. -
1 By Weight Of mix Water, all other additives are BWOCement
C M" ~," ,,:::1\ ,. ',J .i1I, L
¡;I .:,' , 1\
rill.:¡ J. i~..
Proposal Ref: pro10016
.~
'-i ~ ......y-.. "1
o·Ftl..:...·L. .iU5'. $f.-A vìC·.è 5
A HallIburton Company
Kelly Bushing: 52.00ft above Mean Sea Level
Your Ref: Plan to BHL #74 from CD2-D8 (Geo-Pilot Option)
Surface Coordinates: 5974711.45 N~ 371688.72 E (70020' 20.9101" N~ 208057'31.6626" E)
Grid Coordinate System: NAD27 Alaska State Planes~ Zone 4
19 December, 2002
roposal Report
Alaska North $IR.
North SI@Pftl:~~~æ'
".c'(wp01 )
Sperry-Sun Drilling Services
r--
~-"'::':--3
-.c
.. :3
,.-.:~
~ ~ ~ r"";ü
LJ~
f:;:}
~~_~L__ . ~
<:::)
-r~
-'4 .ß
Page 2 of 11
19 December, 2002 - 11:47
North Slope, Alaska
",~--=
~"';
Comment
0.00 SHL (1646' FNL & 1554' FEL. SEC.
T11 N - R4E)
0.000 0.00 Begin Dir @ 2.00/100ft : 200.00ft M[
200.00ft TVD
2.000 0.65
2.000 2.60 .~
2.000 5.85
2.000 7.96 Increase DLS to 2.5°/1 OOft : 550.00ft
MD. 549.13ft TVD
2.500 9.90
2.500 11.74
2.500 10.88 IncreaseDLS to 3.0°/1 OOft : 800.00ft
MD. 795.94ft TVD
3.000 9.68
3.000 10.51
3.000 13.37
3.000 18.24
3.000 25.12
3.000 33.99
3.000 44.81
3.000 57.57
3.000 61.58 Permafrost
3.000 72.23
3.000 88.75 --
3.000 107.08
3.000 127.17
3.000 148.96
3.000 168.18 End Dir. Start Sail @ 51.75° : 2182.4
MD. 1952.22ft TVD
0.000 172.38
0.000 196.35
0.000 220.32
0.000 244.29
0.000 263.71 C-40
0.000 268.25
DriHQuest 3.03.02.005
51.750
51.750
51.750
51.750
51.750
-..;.,..'3 2300.00
f-~
......'" 2400.00
u,loß~ 2500.00
r-- 2581.06
2600.00
44.130
44.130
44.130
44.130
44.130
372338.24 E
372393.87 E
372449.51 E
372494.61 E
372505.15 E
5975264.71 N
5975320.13 N
5975375.55 N
5975420.48 N
5975430.98 N
639.95 E
694.64 E
749.32 E
793.64 E
804.00 E
564.29 N
620.66 N
677.03 N
722.72 N
733.39 N
2025.00
2086.90
2148.81
2199.00
2210.72
1973.00
2034.90
2096.81
2147.00
2158.72
~--..<;;;.-~~
1900.00
c::::. 2000.00
-..,.... 2100.00
~,.,J 2182.45
----
~-~~ 2200.00
51.750
44.130
507.92 N
1963.09
1911.09
372282.60 E
5975209.28 N
585.27 E
43.350
46.321
49.296
51.750
45.642
45.059
44.531
44.130
1761.75
1832.65
1899.81
1952.22
1709.75
1780.65
1847.81
1900.22
372123.53 E
372174.51 E
372227.60 E
372272.84 E
5975054.44 N
5975103.13 N
5975154.80 N
5975199.56 N
428.87 E
479.02 E
531.21 E
575.68 E
350.38 N
399.93 N
452.51 N
498.03 N
1000.00 16.969 58.280
1100.00 19.824 55.354
1200.00 22.715 53.14g,_
1300.00 25.630 51._:~:" ''t'2j 7.
1400.00 28.562 ,_"". 5q:~09 :'-f~~ f~.07
j~~:~t~~iI;~~'~{~~ê m~:~
1800.00t[~~:, 40.381 46.293 1635.28
185.02 N
221.20 N
232.21 N
260.89 N
303.99 N
1444.63
1528.51
1552.00
1609.47
1687.28
371943.21 E
371984.49 E
371996.80 E
372028.38 E
372074.77 E
5974892.14 N
5974927.62 N
5974938.42 N
5974966.57 N
5975008.88 N
251.36 E
292.03 E
304.15 E
335.25 E
380.90 E
59.97 N
77.29 N
98.51 N
123.59 N
152.45 N
371779.73 E
371806.40 E
371836.16 E
371868.94 E
371904.66 E
5974769.87 N
5974786.73 N
5974807.45 N
5974831.97 N
5974860.23 N
90.00 E
116.37 E
145.77 E
178.14 E
213.36 E
900.00
14.172
841.45
62.335
66.74 E
371756.25 E
5974756.91 N
7.701
9.448
11.475
600.00
700.00
800.00
546.72
645.61
743.94
48.105
60.185
68.290
371707.25 E
371719.51 E
371736.00 E
5974732.06 N
5974740.41 N
5974747.89 N
18.18 E
30.29 E
46.65 E
7.000
550.00
40.000
549 .13
497.13
371702.72 E
300.00
400.00
500.00
2.000
4.000
6.000
247.98
347.84
447.45
40.000
40.000
40.000
371689.86 E
371693.30 E
371699.01 E
1.34 N
5.35N
12.02 N
299.98
399.84
499.45
0.000
200.00
200.00
148.00
0.000
0.00 E
0.00 N
0.00
-52.00
0.000
0.000
5974711.45 N
O.OOE
0.00 N
0.00
MeaslØ'ed
Depth
(ft)
Vertical
Depth
(ft)
Sub-Sea
Depth
(ft)
Global Coordinates
Northings Ea
(ft)
Local Coordinates
Northings Eastings
(ft) (ft)
Inct.
Azlm.
Alaska North Slope
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-D8 - CD2-tJ8 (wp01)
Your Ref: Plan to BHL #74 from CD2-DS (Geo-Pilot Option)
Revised: 19 December, 2002
Page 3 of 11
19 December, 2002 - 11:47
Dn7/Quest 3.03.02.005
~"""-"'--"""~
~'.....; ·-~3
..r......"'-_~..:~
~ 4700.00
r-- 4800.00
4900.00
5000.00
5100.00
57.086
57.086
57.086
57.086
57.086
3342.16
3396.50
3450.84
3505.18
3559.51
44.136
44.136
44.136
44.136
44.136
1977.27 N
2037.52 N
2097.77 N
2158.02 N
2218.27 N
3394.16
3448.50
3502.84
3557.18
3611.51
797.09
822.70
848.31
873.92
899.54
373733.08 E
373792.56 E
373852.04 E
373911.52 E
373971.00 E
5976654.02 N
5976713.26 N
5976772.50 N
5976831.74 N
5976890.98 N
2010.81 E
2069.27 E
2127.73 E
2186.19 E
2244.65 E
0.000
0.000
0.000
0.000
0.000
4200.00
4300.00
4400.00
4500.00
4600.00
57.086
57.086
57.086
57.086
57.086
44.136
44.136
44.136
44.136
44.136
3122.48
3176.81
3231.15
3285.49
3339.83
3070.48
3124.81
3179.15
3233.49
3287.83
1676.02 N
1736.27 N
1796.52 N
1856.77 N
1917.02 N
5976357.82 N
5976417.06 N
5976476.30 N
5976535.54 N
5976594.78 N
1718.52 E
1776.98 E
1835.44 E
1893.90 E
1952.36 E
669.02
694.63
720.25
745.86
771.47
0.000
0.000
0.000
0.000
0.000
373435.67 E
373495.15 E
373554.63 E
373614.11 E
373673.59 E
G>':)
-~
a:z-!ty:.L".J
~ ~-~!'..-
3500.00 57.086 44.13e '~ϧ90;
ª¡:ièj~~~F;:~
4100.00~;!fi': 57.086" 44.136 3016.14
C)
2850.79
2905.13
2959.46
3013.80
3068.14
1426.23 E
1484.68 E
1543.14 E
1601.60 E
1660.06 E
1374.78 N
1435.03 N
1495.27 N
1555.52 N
1615.77 N
540.96
566.57
592.18
617.80
643.41
0.000
0.000
0.000
0.000
0.000
373138.26 E
373197.74 E
373257.22 E
373316.71 E
373376.19 E
5976061.62 N
5976120.86 N
5976180.10 N
5976239.34 N
5976298.58 N
''-"'
1254.28 N
1288.52 N
1314.53 N
489.73
504.29 C-20
515.35
0.000
0.000
0.000
373019.30 E
373053.11 E
373078.78 E
5975943.14 N
5975976.81 N
5976002.38 N
1309.31 E
1342.53 E
1367.77 E
469.88
469.96 End Dir, Start Sail @ 57.09° : 3422.ï
MD, 2700.16ft TVD
3422.49 57.079
3422.78 57.086
44.130
44.136
5975897.22 N
5975897.40 N
1264.00 E
1264.17 E
1.000
3.000
372973.20 E
372973.37 E
3000.00
3100.00
3200.00
3300.00
3400.00
52.854
53.854
54.854
55.854
56.854
2405.52
2465.21
2523.48
2580.33
2635.74
44.130
44.130
44.130
44.130
44.130
364.32
388.81
413.61
438.72
464.13
1.000
1.000
1.000
1.000
1.000
372728.16 E
372785.00 E
372842.58 E
372900.86 E
372959.84 E
5975653.13 N
5975709.75 N
5975767.10 N
5975825.16 N
5975883.91 N
2900.00 51.854
2907.38 51.928
44.130
44.130
2396.44
2401.00
2344.44
2349.00
902.50 N
906.67 N
340.16
341.93 C-30
1.000
1.000
372672.06 E
372676.18 E
9-518" Csg Pt ... Allow Build @
1.00/100ft (8-112" Hole): 2889.58ft M
2390.00ft TVD
9 518" Casing '~
2700.00
2800.00
2889.58
51.750
51.750
51.750
44.130
44.130
44.130
2272.63
2334.54
2390.00
2220.63
2282.54
2338.00
858.68 E
913.36 E
962.34 E
789.76 N
846.13 N
896.62 N
292.22
316.19
337.66
Measured
Depth
(ft)
Vertical
Depth
(ft)
Sub-Sea
Depth
(ft)
Local Coordinates
Northings Eastings
(ft) (ft)
Global Coordinates
Northings Eas&!
(ft)
Incl.
Az/m.
Comment
Alaska North Slope
North Slope, Alaska
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-D8 - CD2-D8 (wp01)
Your Ref: Plan to BHL #74 from CD2-D8 (Geo-Pilot Option)
Revised: 19 December, 2002
DriHQuest 3.03.02.005
Page 4 of11
'-c-'
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-D8 - CD2-D8 (wp01)
Your Ref: Plan to BHL #74 from CD2-D8 (Geo-Pilot Option)
Revised: 19 December, 2002
-=-":=.F~~_
~~2z,,;;~;.. North Slope, Alaska
~-O-~~~~~
~~~ ~-'*
~~-
~~- ~~
---- --- -
local Coordinates NO':::~ COOrdi~a:d ð~e::
Northings Eastings Comment
(ft) (ft) (ft)
2278.52 N ~E!:iii i~æ~ ~1;T '=000 925.15
2338.77 N 0.000 950.76
2399.02 N 0.000 976.38
2459.27 N 2478.49 E n 5_ 2"'N 3T~8.93 E 0.000 1001.99
2479.38 N _4~~~¡0 ~1tf7.1IlN 374228.78 E 0.000 1010.54 K-3 Marker
f87.18 N 374268.41 E 0.000 1027.60
977246.42 N 374327.89 E 0.000 1053.21
5977305.66 N 374387.37 E 0.000 1078.83
5977352.68 N 374434.58 E 0.000 1099.15 Base K-3 Sand
5977364.90 N 374446.85 E 0.000 1104.44
2726.08 E 5977378.84 N 374460.85 E 0.000 1110.47 K-2 Marker
2770.78 E 5977424.14 N 374506.33 E 0.000 1130.05
2829.24 E 5977483.38 N 374565.81 E 0.000 1155.67
2832.59 E 5977486.78 N 374569.22 E 0.000 1157.13 Base K-2 Cycle
2887.70 E 5977542.62 N 374625.30 E 0.000 1181.28
294126 N 2946.16 E 5977601.87 N 374684.78 E 0.000 1206.89
3001.51 N 3004.62 E 5977661.11 N 374744.26 E 0.000 1232.50
3061.76 N 3063.07 E 5977720.35 N 374803.74 E 0.000 1258.12
3122.01 N 3121.53 E 5977779.59 N 374863.22 E 0.000 1283.73
3182.26 N 3179.99 E 5977838.83 N 374922.70 E 0.000 1309.34
3242.51 N 3238.45 E 5977898.07 N 374982.18 E 0.000 1334.96
3302.76 N 3296.91 E 5977957.31 N 375041.67 E 0.000 1360.57
3363.01 N 3355.37 E 5978016.55 N 375101.15 E 0.000 1386.18
3423.26 N 3413.83 E 5978075.79 N 375160.63 E 0.000 1411.79
3483.51 N 3472.29 E 5978135.03 N 375220.11 E 0.000 1437.41
3543.76 N 3530.75 E 5978194.27 N 375279.59 E 0.000 1463.02
3604.01 N 3589.21 E 5978253.51 N 375339.07 E 0.000 1488.63
3664.26 N 3647.66 E 5978312.75 N 375398.55 E 0.000 1514.24
3724.50 N 3706.12 E 5978371.99 N 375458.04 E 0.000 1539.86
3784.75 N 3764.58 E 5978431.23 N 375517.52 E 0.000 1565.47
~
19 December, 2002 - 11:47
4483.25 4535.25
4537.59 4589.59
4591.93 4643.93
4646.26 4698.26
4700.60 4752.60
4754.94 4806.94
4809.28 4861.28
4863.61 4915.61
4917.95 4969.95
4972.29 5024.29
44.136
44.136
44.136
44.136
44.136
57.086
57.086
57.086
57.086
57.086
{;~"'.~ 7300.00
-"','c' 7400.00
___c'.: 7500.00
~:..- 7600.00
,.-L~ 7700.00
r---
6300.00 57.086 44.13(5
~~~:~~ ~;:~:~ ~eÆt~}~,' :ttõ:24
6600.00 57.086' ,:.: 44;1,8E),': 4374.58
~;:;,~¡;~,~;:;; 4428.91
Q 7000.00~)tk 57.086 ~-- 44.136
7100.00,;:7"' 57.086 44.136
::t.~J 7200.00 57.086 44.136
Alaska North Slope
Measwed Sub-Sea Vertical
Depth Incl. Azlm. Depth Depth
(ft) (ft) (ft)
5200.00 57.086 44.136 3613.85 3665.85
5300.00 57.086 44.136 3668.19 3720.19
5400.00 57.086 44.136 3722.53 3774.53
5500.00 57.086 44.136 3776.86 3828.86
5533.38 57.086 44.136 3795.00 3847.00
5600.00 57.086 44.136 3831.20 3883.20
5700.00 57.086 44.136 3885.54 3937.54
5800.00 57.086 44.136 3939.88 3991.88
5879.36 57.086 44.136 3983.00 4035.00
5900.00 57.086 44.136 3994.21 4046.21
5923.53 57.086 44.136
6000.00 57.086 44.136
6100.00 57.086 44.136
6105.73 57.086 44.136
6200.00 57.086 44.136
Page 5 of 11
19 December, 2002 -11:47
DrillQuest 3.03.02.005
10400.00
57.210
43.320
6491.38
6439.38
5411.57 N
2257.12
4.000
377123.45 E
5980030.80 N
5342.90 E
.;;.:
.....
<ú¡~~
r--
Begin Oir @ 4.0o/100ft: 10382.60ft r
6481.94ft TVO
10100.00
10200.00
10300.00
10382.60
57.086
57.086
57.086
57.086
6276.39
6330.72
6385.06
6429.94
44.136
44.136
44.136
44.136
6328.39
6382.72
6437.06
6481.94
5167.60 E
5226.05 E
5284.51 E
5332.80 E
5230.74 N
5290.99 N
5351.24 N
5401.01 N
2180.18
2205.79
2231.40
2252.56
0.000
0.000
0.000
0.000
376945.07 E
377004.55 E
377064.03 E
377113.16 E
5979853.00 N
5979912.24 N
5979971.48 N
5980020.41 N
-~
-..~----~
-
!:¡ Lj
C)
-r~
-<J
~-- '"OJ
5570.00
5580.00
5624.34
5678.~,
573 ~
,-;f.".
9200.00 57.086 44.13e1~~fiâ
~~!:!~t;~!;;i~j !:~!
9700.00,:;;;/,!),s1.0$3"¥i,,44.136 6059.04
9800.00:}jif 57.086>' 44.136 6113.37
9900.00 ''l'F 57.086 44.136 6167.71
10000.00 57.086 44.136 6222.05
6078.00
6111.04
6165.37
6219.71
6274.05
5979580.02 N
5979616.03 N
5979675.27 N
5979734.51 N
5979793.75 N
4898.22 E
4933.76 E
4992.22 E
5050.68 E
5109.14 E
4953.11 N
4989.74 N
5049.99 N
5110.24 N
5170.49 N
2062.15
2077.73
2103.34
2128.95
2154.57
0.000
0.000
0.000
0.000
0.000
376670.98 E
376707.14 E
376766.63 E
376826.11 E
376885.59 E
Albian-96
4688.50 N
4748.75 N
4808.99 N
4869.24 N
4929.49 N
1949.66
1975.28
2000.89
2026.50
2052.11
0.000
0.000
0.000
0.000
0.000
5979319.83 N
5979379.07 N
5979438.31 N
5979497.55 N
5979556.79 N
4641.47E
4699.92 E
4758.38 E
4816.84 E
4875.30 E
376409.74 E
376469.22 E
376528.70 E
376588.18 E
376647.66 E
8800.00
8818.40
8900.00
9000.00
9100.00
57.086
57.086
57.086
57.086
57.086
44.136
44.136
44.136
44.136
44.136
1847.21
1851.93
1872.82
1898.44
1924.05
0.000
0.000
0.000
0.000
0.000
376171.81 E
376182.76 E
376231.29 E
376290.77 E
376350.26 E
5979082.87 N
5979093.77 N
5979142.11 N
5979201.35 N
5979260.59 N
4407.63 E
4418.39 E
4466.09 E
4524.55 E
4583.01 E
Albian-97
8300.00
8400.00
8500.00
8600.00
8700.00
57.086
57.086
57.086
57.086
57.086
44.136
44.136
44.136
44.136
44.136
5350.31
5404.65
5458.99
5513.32
5567.66
5298.31
5352.65
5406.99
5461.32
5515.66
1719.15
1744.76
1770.37
1795.99
1821.60
0.000
0.000
0.000
0.000
0.000
375874.41 E
375933.89 E
375993.37 E
376052.85 E
376112.33 E
i86.67 N
~.' _978845.91 N
5978905.15 N
5978964.39 N
5979023.63 N
7800.00
7900.00
8000.00
8100.00
8200.00
44.136
44.136
44.136
44.136
44.136
57.086
57.086
57.086
57.086
57.086
5078.63
5132.96
5187.30
5241.64
5295.98
5026.63
5080.96
5135.30
5189.64
5243.98
1591.08
1616.70
1642.31
1667.92
1693.53
3845.00 N
3905.25 N
3965.50 N
4025.75 N
4086.00 N
Measured
Depth
(ft)
Sub-Sea
Depth
(ft)
local Coordinates
Northings Eastings
(ft) (ft)
Vertical
Depth
(ft)
Global Coordinates
Northings Eas&!
(ft)
Azlm.
Incl.
Comment
Alaska North Slope
North Slope, Alaska
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-oB - CD2-D8 (wp01)
Your Ref: Plan to BHL #74 from CD2-DS (Geo-Pilot Option)
Revised: 19 December, 2002
Page 6 of 11
19 December, 2002 - 11:47
DriHQuest 3.03.02.005
12300.00 90.172 331.859
12400.00 90.172 331.859
7078.89
7078.59
7026.89
7026.59
0.000 3675.58
0.000 3775.58
377249.96 E
377204.31 E
5981689.27 N
5981778.24 N
5441.02 E
5393.85 E
7071.96 N
7160.14 N
4.000 3575.60
4.000 3640.44 TARGET (Heel) Hold 90.17° inc:
12264.86ft MD, 7079.00ft TVD (113
FSL, 1370' FEL, SEC 25-T12N-R4E
Target - BHL 74 (Heel), 100.00 Radit
Current Target
0.000 3640.58 7" Csg Pt... Drill out 6-1/8" Hole:
12265.00ft MD, 7079.00ftTVD
7" Casing
r-"12265.00 90.172 331.859
7027.00
7041.10 N
7079.00
377265.94 E
5981658.13 N
5457.52 E
C:--~2200.00 88.713 334.004
~ ~Ji2264.86 90.172 331.859
--.....~~~-=-
.......-;·:Ja
~--
..,.."""
~.J:.:;;:a.
7078.37
7079.00
7026.37
7027.00
5981599.76 N
5981658.00 N
5487.10 E
5457.59 E
6983.23 N
7040.97 N
377294.52 E
377266.00 E
~.!':~'~
11500.00 73.516 357.887
11600.00 75.572 354.3i"
11642.77 76.468.u.3Šäì
~:~;:;t~;;~~r'
~ 2000.00,~7 84.233 340.646
:=t:J2100.00 86.467 337.317
6986.31
6997.00
7002.08
7014.05
7022.16
7038.31
7049.00
7054.08
7066.05
7074.16
3183.53
3245.70 Alpine C
3279.41
3377.03
3475.93
4.000
4.000
4.000
4.000
4.000
377419.55 E
377405.41 E
377396.80 E
377368.27 E
377334.13 E
5981223.29 N
5981285.89 N
5981319.36 N
5981414.44 N
5981508.05 N
5618.56 E
5603.35 E
5594.16 E
5564.02 E
5528.27 E
6608.96 N
6671.31 N
6704.62 N
6799.20 N
6892.22 N
'.~
2910.96
2998.86
3037.43 Miluveach A
3089.86
3155.97 Alpine 0
4.000
4.000
4.000
4.000
4.000
377452.27 E
377447.36 E
377443.42 E
377436.44 E
377425.09 E
5980933.81 N
5981030.05 N
5981071.37 N
5981126.70 N
5981195.16 N
5656.23 E
5649.67 E
5645.02 E
5637.09 E
5624.58 E
6320.08 N
6416.22 N
6457.46 N
6512.67 N
6580.93 N
68.030
69.599
70.338
71 .522
73.373
11215.14
11300.00
11338.91
11400.00
11492.95
8.470
5.242
3.784
1.522
358.141
2681.36 K-1 Marker
2746.20
2776.99 Kuparuk
2826.61
2904.89 LCU
4.000
4.000
4.000
4.000
4.000
377433.22 E
377443.99 E
377447.49 E
377451.15 E
377452.39 E
5980666.09 N
5980744.46 N
5980780.84 N
5980838.46 N
5980927.05 N
5641.76 E
5651.19 E
5654.07 E
5656.73 E
5656.46 E
10900.00
11000.00
11082.82
11100.00
11200.00
62.819
64.356
65.714
66.005
67.756
6691.54
6736.04
6771.00
6778.03
6817.30
21 .104
16.980
13.64 7
12.964
9.054
6743.54
6788.04
6823.00
6830.03
6869.30
2287.24
2323.95
2367.05
2416.33
2439.21 Top HRZ
2471.57
2532.48
2587.02 Base HRZ
2598.78
2670.13
4.000
4.000
4.000
4.000
4.000
377356.21 E
377386.85 E
377407.90 E
377411.76 E
377430.84 E
390.95 N
980475.08 N
5980547.13 N
5980562.32 N
598065226 N
~,r
58.020
58.996
60.129
61 .406
61.994
10500.00
10600.00
10700.00
10800.00
10842.71
38.682
34.132
29.682
25.338
23.516
5475.28 N
5543.89 N
5617.07 N
5694.44 N
5728.68 N
6544.96
6597.22
664 7.90
6696.75
6717.00
6492.96
6545.22
6595.90
6644.75
6665.00
Measured
Depth
(ft)
Global Coordinates
Northings Easting8 w~ Rail - Section Comment
(ft)
Local Coordinates
Northings Eastings
(ft) (ft)
Vertical
Depth
(ft)
Sub-Sea
Depth
(ft)
Azlm.
Inet
Alaska North Slope
North Slope, Alaska
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-D8 - CD2-D8 (wp01)
Your Ref: Plan to BHL #74 from CD2-D8 (Geo-Pilot Option)
Revised: 19 December, 2002
DriHQuest 3.03.02.005
Page 70f11
'-
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-D8 - CD2-D8 (wp01)
Your Ref: Plan to BHL #74 from CD2-D8 {Geo-Pilot Option}
Revised: 19 December, 2002
North Slope, Alaska
Local Coordinates Global Coordinates
Northings Eastings Northings Easti_ng~ ._ Ratti . Section Comment
(ft) (ft) (ft)
7248.32 N ;::: ~ ;~:~:~:~~ ~ \:i~~r^ ~OOO 3875.58
7336.50 N 0.000 3975.58
7424.67 N 5252.36 E 59g~6 N ~067.36 E 0.000 4075.58
7512.85 N ~~~:b; ~4¡;~~:rt~ ~~~:bi ~ 0.000 4175.58
7601.03 N 0.000 4275.58
3f2.07 N 376930.42 E 0.000 4375.58
82401.05 N 376884.77 E 0.000 4475.58
5982490.02 N 376839.12 E 0.000 4575.58
5982578.99 N 376793.47 E 0.000 4675.58
5982667.96 N 376747.82 E 0.000 4775.58
4875.04 E 5982756.94 N 376702.17 E 0.000 4875.58
4827.88 E 5982845.91 N 376656.53 E 0.000 4975.58
4780.71 E 5982934.88 N 376610.88 E 0.000 5075.58
4733.55 E 5983023.85 N 376565.23 E 0.000 5175.58
4686.38 E 5983112.83 N 376519.58 E 0.000 5275.57
8570.99 N 4639.22 E 5983201.80 N 376473.93 E 0.000 5375.57
8659.17 N 4592.05 E 5983290.77 N 376428.28 E 0.000 5475.57
8747.35 N 4544.89 E 5983379.74 N 376382.63 E 0.000 5575.57
8835.53 N 4497.73 E 5983468.72 N 376336.98 E 0.000 5675.57
8923.70 N 4450.56 E 5983557.69 N 376291.34 E 0.000 5775.57
9011.88 N 4403.40 E 5983646.66 N 376245.69 E 0.000 5875.57
9100.06 N 4356.23 E 5983735.63 N 376200.04 E 0.000 5975.57
9188.24 N 4309.07 E 5983824.61 N 376154.39 E 0.000 6075.57
9276.42 N 4261.90 E 5983913.58 N 376108.74 E 0.000 6175.57
9364.60 N 4214.74 E 5984002.55 N 376063.09 E 0.000 6275.57
9452.77 N 4167.57 E 5984091.52 N 376017.44 E 0.000 6375.57
9540.95 N 4120.41 E 5984180.50 N 375971.79 E 0.000 6475.57
9629.13 N 4073.24 E 5984269.47 N 375926.15 E 0.000 6575.57
9717.31 N 4026.08 E 5984358.44 N 375880.50 E 0.000 6675.57
9805.49 N 3978.92 E 5984447.41 N 375834.85 E 0.000 6775.57
~"
19 December, 2002 - 11:47
7070.79
7070.49
7070.19
7069.89
7069.59
7018.79
7018.49
7018.19
7017.89
7017.59
331.859
331 .859
331.859
331.859
331 .859
c)
~«'
---...
-"",~
.,e~'>-=-
b
r--
90.172
90.172
90.172
90.172
90.172
15000.00
15100.00
15200.00
15300.00
15400.00
7072.29
7071.99
7071.69
7071.39
7071.09
7023.29
7022.99
7022.69
7022.
792"'-
__<_ fit;}.
14000.00 90.172 331 .85~~1;1b21;"
14100.00 90.172 33h__I~:ò,~21.4
;~:;Iti~;~;~~~~' ;;:~
14700.00:;~~{ 90.172 "331.859 7019.69
14800.00 \;p 90.172 331.859 7019.39
14900.00 90.172 331.859 7019.09
a
:::t]
-.,....-..
331 .859
331.859
331.859
331.859
331.859
90.172
90.172
90.172
90.172
90.172
13500.00
13600.00
13700.00
13800.00
13900.00
Alaska North Slope
Measured Sub-Sea Vertical
Depth Inel. Azlm. Depth Depth
(ft) (ft) (ft)
12500.00 90.172 331.859 7026.29 7078.29
12600.00 90.172 331.859 7025.99 7077.99
12700.00 90.172 331.859 7025.69 7077.69
12800.00 90.172 331 .859 7025.39 7077.39
12900.00 90.172 331.859 7025.09 7077.09
13000.00 90.172 331 .859 7024.79 7076.79
13100.00 90.172 331 .859 7024.49 7076.49
13200.00 90.172 331.859 7024.19 7076.19
13300.00 90.172 331.859 7023.89 7075.89
13400.00 90.172 331.859 7023.59 7075.59
Alaska North Slope
MeaslB'ed Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Inet. Azlm. Depth Depth Northings Eastings Northings Eas
(ft) (ft) (ft) (ft) (ft) (ft)
15500.00 90.172 331.859 7017.29 7069.29 9893.67 N 3931.75 E 5984536.39 N WA 3759'M:~O'F< ~OOO 6875.57
15600.00 90.172 331.859 7016.99 7068.99 9981.84 N 3884.59 E 59846~36 N W75i-'5 E 0.000 6975.57
15700.00 90.172 331.859 7016.69 7068.69 10070.02 N 3837.42 E 59~~1!Çi? N ~697.90 E 0.000 7075.57
15800.00 90.172 331 .859 7016.39 7068.39 10158.20 N 3790.26 E m 50811s03.N 3~2.25 E 0.000 7175.57
15900.00 90.172 331.859 7016.09 7068.09 ¡¡~f:¡ó\~l:~ ¡¡¡5:Ë¡ 0.000 7275.57
16000.00 90.172 331.859 7015.79 7067.79 0.000 7375.56
16100.00 90.172 331.859 7015.49 7067.49 0.000 7475.56
16200.00 90.172 331.859 7015.19 7067.19 0.000 7575.56
16264.97 90.172 331.859 7015.00 7067.00 105.1 N ·.3570.96 E 5985217.00 N 375440.00 E 0.000 7640.54
On7lQuest 3.03.02.005
'----
TARGET (Toe) Total Depth: 16264:
MD, 7067.00ft TVD (1638' FNL, 202
FEL, SEC 25-T12N-R4E)
Target - BHL 74 (Toe), 100.00 Radiu
Current Target
-'
Comment
North Slope, Alaska
Page80f11
19 December, 2002 - 11:48
r--
~:ilJ."';:'-:'-_~
-:-~~
~~
)~~,
~~~i,
::I':]
~-.;.
...'~;..
a
The Dogleg Severity is in Degr~~~lR(J~t (
Vertical Section is from 1646' pN\t 15S:4~.FÊ»'~d calculated along an Azimuth of 331.900° (True).
,;;fi%itt?i':, <iJir;~J9)1 "
Magnetic D~nation~~'urfi&is";-i~151 °(1 0-Dec-02)
~~7¡~f·~~~%&.,.- ;~~;!~;>~ ~J~t\T~~:~
Based upon ~nf~:p"ã~~re typè'ktculations, at a Measured Depth of 16264.97ft.,
The Bottom ~~ÖršPJâce~t is 11155.21ft., in the Direction of 18.670° (True).
are relative to True North.
tings are relative to 1646' FNL, 1554' FEL.
te Planes, Zone 4.
All data is in Feet (US) unless otherwise stated. D!ri
Vertical depths are relative to RKB = 52' MS~.tf
Global Northings and Eastings are relativl- d'- ,.
Sperry-Sun Drilling Services
Proposal Report for Plan: C02-D8 - C02-OS (wp01)
Your Ref: Plan to BHL #74 from CD2-08 (Geo-Pilot Option)
Revised: 1 9 December, 2002
DriHQuest 3.03.02.005
Page90f11
Northings Eastings Dip Up-Dip Formation Name
(ft) (ft) Angle Dim.
232.21 N 304.15 E 0.000 359.019 Permafrost --
722.72 N 793.64 E 0.000 0.000 C-40
906.67 N 972.09 E 0.000 0.000 C-3O
1288.52 N 1342.53 E 0.000 359.019 C-20
2479.38 N 2498.00 E 0.000 359.019 K -3 Marker
2687.83 N 2700.26 E 0.000 359.019 Base K-3 Sand
2714.44 N 2726.08 E 0.000 359.019 K-2 Marker
2824.21 N 2832.59 E 0.000 359.019 Base K-2 Cycle
4458.59 N 4418.39 E 0.000 359.019 Albian-97
4953.11 N 4898.22 E 0.000 359.019 Albian-96
sg Pt .Y'Allow Build @ 1.00/100ft (8-1/2" Hole): 2889.58ft MD, 2390.00ft TVD
Start Sail @ 57.09° : 3422.78ft MD, 2700.16ft TVD
I;' @ 4.00/100ft: 10382.60ft MD, 6481.94ft TVD
GET (Heel) Hold 90.17° inc: 12264.86ft MD, 7079.00ft TVD (113' FSL, 1370' FEL, SEC 25-T12N-R4E)
7" Csg Pt... Drill out 6-1/8" Hole: 12265.00ft MD, 7079.00ft TVD
TARGET (Toe) Total Depth: 16264.97ft MD, 7067.00ft TVD (1638' FNL, 2027' FEL, SEC 25-T12N-R4E)
105£8
;fl!:A~~)
896.62 N
1207.75 N
5401.01 N
7040 .97 N
7041.10 N
-'
- R4E)
.. O.OOft TVD
. MD, 549.13ft TVD
. .00ft MD, 795.94ft TVD
(, : 2182.45ft MD, 1952.22ft TVD
0.00 N
O.OON
16.36 N
37.25 N
498.03 N
O.OOE
0.00 E
13.73 E
46.65 E
575.68 E
19 December, 2002 - 11:48
3983.00
4007.00
4106.00
5580.00
6026.00
7067.00
2390.00
2700.16
6481.94
7079.00
7079.00
0.00
200.00
549.13
795.94
1952.22
Comment
Station Coordinates
. TVD Northings Eastings
(ft) (ft) (ft)
Formation TODS:;,;}');,,>
M~·~~1:;~~i?~~·
·rr:.:~_
1628.63 ~;}' 1552.00 1500.00
2581.06 2199.00 2147.00
2907.38 2401.00 2349.00
3556.84 2773.00 2721.00
5533.38 3847.00 3795.00
North Slope, Alaska
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-oB - CD2-D8 (wp01)
Your Ref: Plan to BHL #74 from CD2-D8 (Geo-Pilot Option)
Revised: 19 December, 2002
4035.00
4059.00
4158.00
5632.00
6078.00
5879.36
5923.53
6105.73
8818.40
9639.20
r:*-,-v:,
¿,.'': ..jj
~
~:-~
"'~~
~~
r--
~~~~t:"r;j
a
:::J::j
16264.97
2889.58
3422.78
10382.60
12264.86
12265.00
0.00
200.00
550.00
800.00
2182.45
Measured
Depth
eft)
Comments
Alaska North Slope
DriHQuest 3.03.02.005
Page 100t11
19 December, 2002 - 11:48
a
:.:J_J
.............~-
C'"
...~ J
~o."
:;~:~
=):~
~
!j
9 518" Casing
7" Casing
2390.00
7079.00
M~~~~i~~~~~
Casing Detail
Casino details
North Slope, Alaska
Formation Tops (ContinuedJ
Measured Vertical Sub-Sea
Depth Depth Depth Northings Eastings Dip
(ft) (ft) (ft) (ft) (ft) Angle
10842.71 6717.00 6665.00 5728.68 N 5550.20 E
11082.82 6823.00 6771.00 5932.69 N 5618.48 E
11215.14 6875.00 6823.00 6052.07 N 5641.76 E
11338.91 6919.00 6867.00 6167.05N 5654.07E
11492.95 6967.00 6915.00 6313.32 N 5656.4& c_
11642.77 7006.00 6954.00 6457.46 N 5~~ 0.0¿~' 359.019 Miluveach A
11770.84 7033.00 6981.00 6580.93 N~!~2"¿8 E_ 0.000 359.019 Alpine D
11865.07 7049.00 6997.00 6671.31 N ilfw~.~ 0.000 359.019 Alpine C
-..-'
Alaska North Slope
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-D8 - CD2-D8 (wp01)
Your Ref: Plan to BHL #74 from CD2-D8 (Geo-Pilot Option)
Revised: 19 December, 2002
Sperry-Sun Drilling Services
Proposal Report for Plan: CD2-D8 - CD2-D8 {wp01}
Your Ref: Plan to BHL #74 from CD2-D8 (Geo-Pilot Option)
Revised: 19 December, 2002
Alaska North Slope
Targets associated with this wellpath
Target Name
BHL 74 (Heel)
BHL 74 (Toe)
Q
:t:J
-----...::: -";j,,:,.:a
t:r~~)
~~_--c-_:'~
~~~
"-
--.-c.::;;~...
n,!,-~:_____i;..1
_~=>o
19 December, 2002 -11:48
Page 11 of 11
North Slope, Alaska
Targe ates
Eastings Target Target
(ft) Shape Type
7040.97 N 5457.59 E Circle Current Target
5981658.00 N 377266.00 E -~
70021' 30.1435" N 2090 00' 11.2343" E
7067.00 10568.21 N 3570.96 E Circle Current Target
7015.00 5985217.00 N 375440.00 E
700 22' 04.8473" N 2080 59' 16.1207" E
100.00ft
.~
DrillQuest 3.03.02.005
~
G ___~nI- ·II*'
... -Oi 1\AUr.1I IPS
ConocoPhillips Alaska, Inc.
Colville River Unit
Alpine (CD2 Pad)
CD2-08 (wp01)
,/ SHL (1646' Ff..JL & 1554' FEL SEC. 2 - TîlN - R4E)
o - ..- --- -- .-- .- ----
1200 -
2400 -
:J
CJ)
:2
~
U)
II
ca
~ 3600 -
!;.
..r:::.
ã.
Q)
0
(ij
0
'€
Q)
>
4800 -
<:::)
::0
~
~
~.~
"""'--:. ~ it
6000 -
-- "----~._~
.,.<D
.~~
~--....06S
7200 -
__ Begin Dir @ 2.0"/100ft : 200.00ft MD, 2OO.00ft TVD
--4' Increase DLS to 2S'/100ft : 550.00fl MD, 549.13ft TVD
--::f,<\\f'
.::-- IncreaseDLS to 3.0</100ft : 8OO.ooft MD, 795.94ft TVD
~'è,>'"
, .f/~.
! I End Dir, Start Sail @ 51.75c : 2182.45ft MD, 1952.22ft TVD
t, /
, ,~, 9-518" Csg Pt '" Allow Build @ 1.0c/1ooft
¡ ,.4-#" (8-112" Hole): 2889.58ft MD, 2390.00ftTVD
I . ~~.. ...S':m .. .........-..
- .¡;.1J-- . ,...... ,.....
~ f . ~# End D~r, .S~~~~~il .({g. ~!~09° :.~~:..7~ft~~~700~_16ft TVD
, . I .ji.~.
-0 I
-o!
~I
~d
,
~
I
1-0
I~-
I~
I -øiJI
I
\¡j><f>.,
.p
:\
I
-1200
o
DrillQuest 3.03.02.005
Scale: 1 inch = 1200ft
I
1200
cí}
Reference is True North
-'
Well:
Current Well Properties
Plan: CD2·08
Horizontal Coordinates:
Ref. Global Coordinates :
Ref. Structure:
Ref. Geographical Coordinates :
5974711.45 N, 371688.72 E
268.01 N, 33.36 W
70° 20' 20.9101" N, 208° 57' 31.6626" E
1646' FNL & 1554' FEL, SEC. 2 - T11 N - R4E
52.ooft above Mean Sea Level
True North
Feet (US)
RKB Elevation :
North Reference :
Units:
~~·~""I:~y_.rct\JI1
º_"Jb_~.1 ~,-~:_.~.~~~!t.<~H;ja s
A Halliburton Company
Begin Dir @ 4.0011ooft : 10382.60ft MD. 6481.94ft TVD
. .7-- r ARG~r\~~i!;~t~1~3~~:;~n¿' i~e;5~~~¡~~À~~f9~~~VD
~. ..... ' 1 /7~~~ft~~~·~~~i~¡~~·~··_·' TA~G~;~o-eì Total ~ePt~:~/6;64'97ft MD. 7067.00ftTVD
~.~ (1638' FNL. 2027' FEL. SEC 25-T12N-R4E)
~. ~~i~~'fl~i(~j~ t ~~1 ~~~1?:~ii:~~j<it~ ~ ~~i ~~-~~~~ ~ ~~l_.
T'Csg Pl \; '\
~:1~.-gg: BHL 74 (Heel) BHL 74 (Toe)
7079.00 TIV, 7040.97 N, 5457.59 E 7067.00 TVD. 10568.21 N, 3570.96 E
I I I I I
3600 4800 6000 7200 8400
.----
I
2400
12000 -
1 ??oo -
8000 -
~ 6000-
c:
:.c
-e
o
z
4000 -
C>
::a
~-';"':_.J..q
f;~> c) 2000 -
'.~.....:.,.~
_.:--~ ß)
: ,Ä_~"'h
4'",.=t-
o
C\J
II
.J::
o
.£
0-
i¡)
(ij
o
en
Scale: 1 inch = 200011
o
f
I
2000
I
IJIlI, N (T()d
7fj(¡7.fJiJ nv, W.'iMJ,2/ ,v, 357fJ.96 R
Eastings
4000
I
6000
I
8000
I
TARGET (Toe) Totaj Depth: 16264.97ft MD, 7067.00ft TVD
(1638' FNL. 2027' FEL. SEC 25-T12N-R4E)
7" Csg Pt ... Drill out 6-118" Hole:
12265.ooft MD, 7079.00ft TVD
T Csg Pl
MD: 12265.00ft
1VD: 7079.00~
BilL 74 (Ii e e Ii / TVD: 7I:.OO.CO<'"a
7(}79.fJfJ TH>, 70+0.97 S, :.457.59 E
End Dir, Start Sail @ 51.750: 2182.45ft MD, 1952.22ft TVD
- IncreaseDLS to 3.00/100ft: 800.00ft MD, 795.94ft TVD
. ----.-----------~-~-~~~-~- n
", =----- Increase DLS to 2.5°/100ft: 550.00ft MD, 549. 13ft TVD U
"-
I ......, Begin Dir @ 2.00/100ft: 200.00ft MD, 200.00ft TVD
......
SHL (1646' FNL& 1554' FEL, SEC. 2 - T11N - R4Eì
I I
2000 4000
t TVO: 3COOJJO!
9-518' Csg PI.
I MD: 2889.58(t
I :D:9Q.OOIt
Drill Quest 3.03.02.005
Scale: 1 inch = 200011
o
TARGET (Heei) Hoid90.1T inc:
12264.86ft MD. 7079.00ft TVD
(113' FSL, 1370' FEL. SEC 25- T12N-R4E)
Begin Dir @ 4.00/100ft :
10382.60ft MD, 6481.94ft TVD
End Dir, Start Sail @ 57.09° : 3422.78ft MD, 2700. 16ft TVD
9-5/8" Csg Pt... Allow Build @ 1.00/100ft
(8-1/2" Hole): 2889.58ft MD, 2390.00ft TVD
I
6000
I
8000
Eastings
1 ??oo
I
- 12000
- 1 ??oo
- 8000
- 6000
-4000
-2000
I
1 ??oo
G ,.:!6a.. _II-
.. OnocUr.1I Ips
ConocoPhillips Alaska, Inc.
Colville River Unit
Alpine (CD2 Pad)
CD2~08 (\Yp01)
.-
t<¥.·O\
~"
Reference is True North
Current Well Properties
Well: Plan: CD2-Q8
Horizontal Coordinates:
Ref. Global Coordinates:
Ref. Structure:
Ref. Geographical Coordinates:
5974711.45 N, 371688.72 E
268.01 N, 33.36 W
70° 2fJ 20.9101" N, 208° 57' 31.6626" E
1646' FNL& 1554' FEL, SEC. 2 - T11N - R4E
52.00ft above Mean Sea Level
True North
Feet (US)
RKB Elevation:
North Reference :
Units:
~.......... .... \':1-" .II!
Q A ~ L.~ L-I_~~~_ J~.~-~ ,,-, t; e ~
A HallibUrton Company
~
~\'~
~-
y\e.r-.
·,0
ÑY'
ConocoPhillips Alaska, Inc. CD2-08 (wp01)
- - -- - -- - - - -
MD Inc Azlm. SSTVD TVD NIS EIW Y X DLS V.S. Comment
(ft) (Deg) (Deg) (1t) (ft) (ft) (ftl (ft} (ft) . e/1OOft) (!t)
0.00 0.00 0.00 -52.00 0.00 0,00 N 0.00 E 597 4711 ~45 t\Î 371688.72 E O~OO 0.00 SHL (1646' FNL & 1554' FEL
200.00 0.00 0.00 148.00 200.00 0.00 N 0.00 E 5974711.45 N 371688.72 E 0.00 0.00 Begin Dir @ 2.00/100tt
550.00 7.00 40.00 497.13 549.13 16.36 N 13.73 E 5974727.57 N 371702.72 E 2.00 7.97 Increase DLS to 2.5°/1000
800.00 11.48 68.29 743.95 795.95 37.25 N 46.65 E 5974747.89 N 371736.00 E 2.50 10.88 IncreaseDLS to 3.0o/100ft
1628.63 35.31 47.62 1500.00 1552.00 232.21 N 304.15 E 59ì 4938.42 N 371996.80 E 3. (,1{) 61.58 Permafrost
2182.45 51.75 44.13 1900.22 1952.22 498.03 N 575.68 E 5975199.56 N 372272.84 E 3.00 168.18 End Dir; Start Sail -
2581.06 51.75 44.13 2147.00 2199.00 722.72 N 793.64 E 5975420.48 N 372494.61 E 0.00 263.72 C-40
2889.58 51.75 44.13 2338.00 2390.00 896.62 N 962.34 E 5975591.47 N 372666.26 E 0.00 337.66 9-5/8" Csg Pt ... Allow Build in 8-1/28 Hole
2907.38 51.93 44.13 2349.00 2401.00 906.67 N 972.09 E 5975601.35 N 372676.18 E 1.00 341.93 C-30
3422.78 57.09 44.14 2648.16 2700.16 1207.76 N 1264.17 E 5975897.40 N 372973.37 E 1.00 469.96 End Dir; Start Sail
3556.84 57.09 44.14 2721.00 2773.00 1288.52 N 1342.54 E 5975976.81 N 373053.11 E 0.00 504.29 C-20
5533.38 57.09 44.14 3795.00 3847.00 2479.38 N 2498.00 E 5977147.72 N 374228.78 E 0.00 1010.54 K-3 Marker
5879.36 57.09 44.14 3983.00 4035.00 2687.83 N 2700.26 E 5977352.68 N 374434.58 E 0.00 1099.15 Base K -3 Sand
5923.53 57.09 44.14 4007.00 4059.00 2714.44 N 2726.08 E 5977378.84 N 374460.85 E 0.00 1110.47 K-2 Marker
6105.73 57.09 44.14 4106.00 4158.00 2824.21 N 2832.59 E 5977486.78 N 374569.22 E 0.00 1157.13 Base K-2 Cycle
8818.40 57.09 44.14 5580.00 5632.00 4458.59 N 4418.39 E 5979093.77 N 376182.76 E 0.00 1851.93 Albian-97
9639.20 57.09 44.14 6026.00 6078.00 4953.11 N 4898.22 E 5979580.02 N 376670.98 E 0.00 2062.15 A!bian-96
10382.60 57.09 44.14 6429.94 6481.94 5401.01 N 5332.80 E 5980020.41 N 377113.16 E 0.00 2252.56 Begin Dìr
10842.71 61.99 23.52 6665.00 6717.00 5728.68 N 5550.20 E 5980344.31 N 377336.14 E 4.00 2439.21 Top HAZ
11082.82 65.71 13.65 6771.00 6823.00 5932.70 N 5618.48 E 5980547.13 N 377407.90 E 4.00 2587.02 Base HRZ
11215.14 68. 03 8.47 6823.00 6875.00 6052.07 N 5641.76 E 5980666.09 N 377433.22 E 4.00 2681.36 K -1 Marker
11338.91 70.34 3.78 6867.00 6919.00 6167.05 N 5654.07 E 5980780.84 N 377447.49 E 4.00 2776.99 Kuparuk
11492.95 73.37 358.14 6915.00 6967.00 6313.33 N 5656.46 E 5980927.06 N 377452.39 E 4.00 2904.89 LCU ~
11642.78 76.47 352.82 6954.00 7006.00 6457.46 N 5645.02 E 5981071.37 N 377443.42 E 4.00 3037.43 Miluveach A
11770.84 79.20 348.39 6981.00 7033.00 6580.93 N 5624.58 E 5981195.16 N 377425.09 E 4.00 3155.97 Alpine 0
11865.07 81.25 345. 18 6997.00 7049.00 6671.31 N 5603.35 E 5981285.90 N 377405.41 E 4.00 3245.70 Alpine C
12264.86 90.17 331.86 7027.00 7079.00 7040.97 N 5457.59 E 5981658.00 N 377266.00 E 4.00 3640.44 TARGET (Heel) Hold 90.17° inc
12265.00 90.17 331.86 7027.00 7079.00 7041.10 N 5457.53 E 5981658.13 N 377265.94 E 0.00 3640.58 78 Csg PI ... Drill out 6-1/8" Hole
16264.97 90.17 331.86 7015.00 7067.00 10568.21 N 3570.96 E 5985217.00 N 375440.00 E 0.00 7640.54 TARGET Total
t::)
:::t:~j
~:r____,__~__'3
t¡-;~ ~~- --::;:~ ~~
~:....;: --~
"-_':'~
.;. --'----~..u
&
L·~~
) SPERRY_SUN RES )
Anticollision Report
"Ql1UþaJ)y: '. PhilUps Alàs~alnö.
.' .'iekd: ......... ' . 'CÞlville RiVer Unit', ,
'Reter~nceSite: ·AlplneCÖ2' ....,
Rêfetence.WeU~ '" ,.' ,Þt~lm; CD;2~08 . "
.. ~~eter:~I,ceWeµpa~: .'CD2~ßHL; 74 (Prelim)
NO GLOBAL SCAN: Using user de1ined selection & scan criteria
Interpolation Method: MD Interval: 50.00 ft
Depth Range: 36.10 to 16265.90 ft
Maximum Radius: 10000.00 ft
Survey Program for Definitive Wellpath
Date: 12/10/2002 Validated: No
PlwUled ]!'rom To Survey
ft ft
36.10 1300.00
1300.00 16265.90
Cw.illg })oill(s
1\1D, ,
'ft,'
2889.58
12266.00
16265.90
Summary
rrvt!
f~ '
2390.00
7079.00
7067.00
Planned: CD2-BHL74 (Gee-Pilot
Planned: CD2-BHL74 (Gee-Pilot
1~~tC!r
,In ."
9.625
7.000
5.500
lIol~ Siz~ .
, . 'in,..'
12.250
8.500
6.000
,Dat~: ,., 2/19/20~2,
"11l)le:, '11:~5:28 '
) "
, '
'~e:
. p,.' . " . ".
'ÇO:.o~db,ate(N.i) Rt!ter~nce;" 'W~U!Prelim:GD2.b8;'rru~N()rth
Vertical(l'VD)Refere~ce~ ',' 52'MSL52~O" ,',
.Þbt,'Or~lè.
Principal Plan & PLANNED PROGRAM
ISCWSA Ellipse
Trav Cylinder North
Ellipse + Casing
Reference:
Error Model:
Scan Method:
Error Surface:
Version: 4
Toolcode
Tool Name
CB-GYRO-SS Camera based gyro single shot
MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC
95/8"
7"
51/2"
, ", I',,',' ,. "'",', '," I ".
, "'i..~,.,;,,~,,"':~,·;~.,~·~···~..ott$~t· ~yellp_1) .~~~-~..~--~..~~~.~.......:>
. S1.~ , Well ' ,W~4path.
Alpine CD1
Alpine CD1
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine C02
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine C02
Alpine CD2
Alpine CD2
Alpine CD2
Alpine C02
Alpine CD2
Alpine C02
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine C02
Alpine C02
Alpine C02
Alpine CD2
Alpine C02
CD1-31
CD1-32
CD2·13
CD2-13
CD2~13
CD2-14
CD2-15
CD2-15
CD2-15
CD2-16
CD2-16
CD2-17
CD2-19
CD2-22
CD2-23
CD2-23
CD2-24
CD2-24
CD2-25
CD2-26
CD2-26
CD2-26
CD2-28
CD2·28
CD2-29
CD2-32
CD2-32
Plan: CD2-31
Plan: CD2-31
Plan: CD2-31
Plan: CD2-31
Plan: CD2-31
Plan: CD2-31
Plan: CD2-31
Plan: CD2-31
Plan: CD2-31
Plan: CD2-31
Plan: CD2-31
Prelim: CD2-Q5
Prelim: CD2-06
Prelim: CD2-10
Prelim: CD2-12
CD1-31 V6
CD1-32 V1
CD2-13 V1
CD2-13PB1 V10
CD2-13PB2 V4
C02-14 V1
CD2-15 V3
CD2-15PB1 V1
CD2-15PB2 V2
CD2-16 (Rig Surveys) V
CD2-16 V7
CD2-17 VO
CD2-19 V8
CD2-22 V1
CD2-23 V2
CD2-23PB1 V12
CD2-24 VO
CD2-24PB1 V1
CD2-25 V1
CD2-26 V4
CD2-26PB 1 V2
CD2-26PB2 V3
CD2-28 (Rig Surveys) V
Plan: CD2-28 V9 Plan:
CD2-29 V6
CD2-32 PB1 VO
CD2-32 VO
PLAN: CD2-31 (GR Horz)
Plan: CD2-31 (ST Core)
Plan: CD2-31 PB1 (Core
Prelim: CD2-ERD 1 VO P
Prelim: CD2-ERD 2 VO P
Prelim: CD2-ERD 3 VO P
Prelim: CD2-ERD 4 VO P
Prelim: CD2-ERD 5 VO P
Prelim: CD2-ERD 6 VO P
Prelim: CD2-ERD 7 VO P
Prelim: CD2-ERD 8 VO P
CD2-Q5 V1 Plan: CD2-05
CD2-06 VO Plan: CD2-06
CD2-10 VO Plan: CD2-10
CD2-12 V2 Plan: CD2-12
. , .Refer{'onc~' ,Offs~t Ctr~CtrN(~.(,.o . Mlo'W~le
MD 1\10 Distance Area , De'"iation. Warmllg //
ft . ft ' ff tf 'ff ,. , .
11793.05 14360.37 114.64 35.19 114.64 Pass: Minor 1/200
10198.46 14100.00 910.43 240.52 711.23 Pass: Major Risk
947.11 950.00 24.70 17.84 7.35 Pass: Major Risk
947.11 950.00 24.70 17.84 7.35 Pass: Major Risk
947.11 950.00 24.70 17.84 7.35 Pass: Major Risk
249.30 250.00 60.15 4.39 55.76 Pass: Major Risk
298.31 300.00 71.15 5.78 65.37 Pass: Major Risk
298.31 300.00 71.15 5.78 65.37 Pass: Major Risk
298.31 300.00 71.15 5.78 65.37 Pass: Major Risk
249.07 250.00 79.97 4.53 75.44 Pass: Major Risk
249.07 250.00 79.98 4.42 75.55 Pass: Major Risk
297.91 300.00 90.34 5.40 84.95 Pass: Major Risk
248.72 250.00 110.24 4.13 106.11 Pass: Major Risk
248.39 250.00 140.43 4.22 136.21 Pass: Major Risk
344.50 350.00 150.51 6.06 144.46 Pass: Major Risk
344.50 350.00 150.51 6.17 144.35 Pass: Major Risk
248.16 250.00 160.49 4.32 156.17 Pass: Major Risk
248.16 250.00 160.49 4.32 156.17 Pass: Major Risk
296.06 300.00 171.06 5.52 165.54 Pass: Major Risk
439.70 450.00 178.91 7.64 171 .31 Pass: Major Risk
247.89 250.00 180.85 4.38 176.47 Pass: Major Risk
247.89 250.00 180.97 4.46 176.52 Pass: Major Risk
295.44 300.00 200.63 5.30 195.33 Pass: Major Risk
295.42 300.00 201.13 6.25 194.88 Pass: Major Risk
295.23 300.00 210.35 5.45 204.90 Pass: Major Risk
247.29 250.00 240.53 4.42 236.11 Pass: Major Risk
247.29 250.00 240.53 4.42 236.11 Pass: Major Risk
247.39 250.00 230.29 4.96 225.33 Pass: Major Risk
247.39 250.00 230.29 5.07 225.22 Pass: Major Risk
294.78 300.00 231.12 6.24 224.88 Pass: Major Risk
247.39 250.00 230.56 4.90 225.66 Pass: Major Risk
247.39 250.00 230.33 4.96 225.37 Pass: Major Risk
247.39 250.00 230.38 4.95 225.44 Pass: Major Risk
341.80 350.00 231.38 6.79 224.59 Pass: Major Risk
247.39 250.00 230.55 4.91 225.65 Pass: Major Risk
247.39 250.00 230.36 4.95 225.41 Pass: Major Risk
247.39 250.00 230.41 4.94 225.47 Pass: Major Risk
294.68 300.00 230.81 5.99 224.82 Pass: Major Risk
450.49 450.00 23.47 8.71 14.77 Pass: Major Risk
400.72 400.00 18.35 8.45 9.91 Pass: Major Risk
696.20 700.00 19.87 14.61 5.45 Pass: Major Risk
446.92 450.00 41.54 9.34 32.21 Pass: Major Risk
OR i ,'U ". I
' , ;1" O".: .
:~~ ~ .' :/ L~
. ' ",~ " ! .
) SPERRY_SUN RES )
Anticollision Report
Cb.mpany: .
¡;'ield:. ". '
.' RøCerençe' Site:.
Rde,,~nc.e, Wen~
.~~etef;'eoce Wèµpa~~:
"PhilUpsAI,aaka Inç~,
'GOlviltê F\¡verUhlf', .'.
.. Alpine·CD2.' .
,Þrèl1m;CD2..o8 .
'Cb2~aH L14. (Prelim)
. ,.
t>ut~~,21~'9/2Q02' Tjme:. 11 :?5:28 :~~e,:' 2. ,
, , .
. Ò'~ord¡'nate(NR) R~fereutt;·· . WeU: ÞreH'm:' Cœ~~08, 'frueNorth
Verti~{l'yo) R.ererence~ 52' M$L52.0' '.' ,
'pbl,Oraçle" .
I, I . ',"," I . . 'Offs~t "Ct¡'~qr '. N~~(~ 'I 'r I r
.Re~~rt'!"c~' NJowable.
MD. ·MO . '. J)i$tancð Area' .'. Pevia1¡on WarJ1jPg ,..... '. .
1'1. ,ft . ft fi ft ft . .<of(
Alpine CO2 Prelim: C02-18 C02-18 VO Plan: C02-18 297.64 300.00 101.16 6.28 94.87 Pass: Major Risk
Alpine CO2 Prelim: C02-20 C02-20 PB1 VO Plan: CO 827.24 850.00 107.26 17.23 90.12 Pass: Major Risk
Alpine CO2 Prelim: C02-20 C02-20 VO Plan: C02-20 827.24 850.00 107.26 17.34 90.01 Pass: Major Risk
Alpine CO2 Prelim: C02-30 C02-30 VO Plan: C02-30 294.99 300.00 221.12 6.24 214.87 Pass: Major Risk
Alpine Satellites Alpine#3 Alpine #3 V4 15765.56 7100.00 183.75 156.12 35.98 Pass: Major Risk
C J .~ " · ,f;~ f ð ,
K,~:':;\ ,! \: ..J ,
~. ¡,¡ \,¡l~ .~.¡ . i ,):.r1
WELLPATHDlITAIIS
CDHlliL 74 (Pccli:n)
Rig: Doy<m 19
RefThinnr 5'l'MSL 52.(X)ft
V.S= ~ +~ ~~'D
18.67> 0.00 0.00 0.00
COMPANY DETAIIS
~ AIaill mo.
~
~
~MeIbc-d: Mmmmemv.mre
&ror Syotmr ISCWSA
Sem MtohOO: TriV C}-&.d.. North
Enœ Smfiœ: ~.. Cosi;g
Wami>g MeIhod: Rules Bosed
~"'"fI-COLLISION SETIL"IGS
InterpoJation Method:MD Interval: 50.00
Depth Range From: 36.10 To: 17071.59
Maximum Range: 1903.55 Reference: Plan: C.'D2-BHL74 (Geo-PilolPrelim)
Sbt
N'A
ÙJngho:l.
ISI"02'28.337W
L1Uud.
7(y·20'20.9ION
WElL OOT AILS
l'bIth.Í1g [anÍlg
Y/747I1.4S 311688.72
.JY·W
-8.71
.N'.
69.66
e
m: CD2-08
I
'-
",t?-
C,\) ÿ
~
-40
Pre!
-30
:D2-1
-20
-10
90 -0 27,
Prelim: CD2-O~ (CD2-05)
-10
-40
-W
-20
-30
From Colour To 1I.ID
o ~=-~'>~=" 300
300 ~..,-,..= 500
500 - 1000
1000 - 1500
1500 - 2000
2000 2500
2500 - 3500
3500 4500
4500 - 5500
5500 ~ 6500
6500 - 7500
7500 8500
8500 - 9500
9500 ~ 10500
10500 11500
11500 - 13500
13500 ~ 15500
~ - 11m
Tool
CB-GYRQ-SS
MWD+IFR-AK-CAZ-SC
SlJRVEY PROORAM
Depth To SwveylPlan
1300.00 Planned: CD2-BHL74 (Geo-Pilot
16265.90 Planned: CD2-BHL74 (Geo-Pilot
Depth Fm
36.10
1300.00
10
00
50
CD2-08 (wpOl)
--- iipproved Plan ~uu.
~-- --- - -.. -- ,,-----.--- -- .... .--- ---- ---..- ---...--- ,'-- - --- .,
---- .. - - - - - - - - - _.- .... - . -" - - - .
----~...' .. . -. . - -' - -' - - - -' - -' - - -.' - . - - -.-. - - --' -." - --.-. '.' . - - - ~. .- - ".- - - ,- -~-
"._._..-- -__7_ _-..____ ..~ -_____-__ '-c-,. --_ _ __~___-.___. -_--_~ --- _._-- - -_-
=---"-'-----·,0---·.----,- ,_____._ _ .._,,-.---- .__._. ,._._ ,,_~_. .___ ,_ ._ _._._ - -. .-Õ.-.'.
.___ , ___ ___ __ , _ _ . _ _ _. _,_ __.____ _ ___._ _ _,_d__,',_ _ _ ._
- - - . - -. .... . - . . - - -
=-",_'~_ _ __._-: .-'.._ --'.. __-,-:--.---..- - _~--.- -_-'--::Õ-.-;-'-...- .:~,·.c_o. -.- ____-:õ,_-:·. .'-_-'.._--: .-_-.- . ~ -, .-.,_-..
.-,-' -- ., . - -. .. - - ,- - - -. . - - -- - ,. -.- - , ,'.', .., - - - - -
3~ii{J-~-·¿~~a%~~~~Bt~-ìil!~(@:~~i.l~
[deg] vs Centre to Centre Separation
+FJ-W DLeg TFace VSec Target
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
13.73 2.00 40.00 19.89
46.65 2.50 60.00 50.22
575.68 3.00 330.97 656.11
962.34- 0.00 0.00 1157.50
1264.00 1.00 0.00 1548.66
1264.21 3.00 22.91 1548.94
5333.24 0.00 0.00 6824.60
5458.04 4.00 -80.00 8418.21 BHL 74 (Heel)
3571.26 0.00 0.00 11156.12 BHL 74 (Toe)
[deg] vs Centre to Centre Separation [lOOftJin]
+N/-S
0.00
0.00
16.36
37.25
498.03
896.62
1207.58
1207.80
5401.58
7041.54
10569.06
Azimuth (lFO+AZI)
TVD
36.10
200.00
549.13
795.94
1952.22
2390.00
2700.00
2700.20
6482.00
7079.00
7067.00
00
10
C MD lne Azi
~ 36.10 0.00 0.00
~ J .'!NI.OO 0.00 0.00
. r :,';1).00 7.00 40.00
~~... ~(N'I.OO 11.47 68.29
e3··~ : I ~·~.45 51.75 44.13
E5......" 6~) _·~·~l.58 51.75 44.13
"-'<-'. 7~ 1--1: .~.49 57.08 44.13
""'0. 8 ~ w: ~.86 57.09 44.14
,-r-. 9" 1" 'k '.23 57.09 44.14
"" ~·10~· l~ :t. ';.46 90.17 331.86
.~·lL.. l~·.'f·.;.90 90.17 331.86
r.._"""",
!! Travelling Cylinder
[2Oft/in]
Travelling Cylinder Azimuth (1FO+AZf)
¡
JI~
:1' ¡.!'
j kj
'.
\
-"'\-
'\.
\.
\,
\" I
\ I
\
),
l\
1\
··r-"'-·· --
'~.
\\
I \..
I '\
"\
I I
O 6.Sp(}
rll
.·J~{d~,,~
,'. ~ ~ ~)]
Wcst(-)Æast(+) fftl
I
7319
"
'~ ,
5692
I
I
3253
I
2440
¡ " I 1 :
r-···;· ....., '.' . .~. . .' ."- ..
I Conocof'hllllp5
I 'I I ,: ..r
:.. :ii'::::,·"..:.....,.'":::':':,·,:,::.,i,,..,,'....·....."..:.\.:.:',::..,1'1'· ·,..····.I....'.··.::,::ll .!
--r-........,....._."CiJ?if'lRQ .... ...... __..1..... ....
I : .:,'::;'~:~·~7,~~::'·':i·':··.. I
I.·.. : ,I V . ': . 'I'" ',<,~'" .'
I ,!
, i
,.......j.-..... I..__._...~...
I
Circles of
, 1320' Radius 1
-f··_..- 1 ..--..-." -;-.---~, ..,~.._.. : ----..~-
I
I
.....l·.....-
I
,,1_..-.1 __..,___
I .JBHL 74 (Heel) I
, I !
~. I ,I CDl-30 (CDl-30) ~~ i
, I I ' I
I'. . --,,----1 CD1-3l (CDl-31) I
't.-- I I,
) , . 1-.- -..---.-.
-- .-~ -7oiO -:.- ----- .-----
I\.
\,
'16900 "'\
\
~ "ï
- --~6fJ-
6. Vol
~o
- - I CDl-32 :(CD 1-32) I
-t.---- --
i
-.-- ._._-
4879-----
_ I CD2-16 (CD2-16) (
I
I
--- ---
I
I
-I
I
I
-.--..,,-...- ....".,,-..--
I
I
I
I
---'"1 .-.-- ----- ----. I--~
I CD2-13 (CD2-13PB1) I -
--~-~ ---
5692-- -.-¡
\
--.--.-." "-'-"-~'-'"
6506-";"'-'
7319
8132- ---'""1""'"
§:
,.....,
;t
~
~,
~.
:::I
o
C'.)
8945- ....~......
I
.........-;-+........: ".--...-.
I
I
9759- --"-.'.-."
1 0572-'---"""-'
I
I
I
11385--·-'·-'-- .~._,-_....,
Pl¡;n: CD2-08 69.6ú ·8.11 5974711.45 3"/l688.72 W20'20,910N 151"02'2S.33'1W N/A
I.atU1XIe l.Dl1glt1Xle Slot
+Ni·S +E/. W No,thing Eastil1g
Noone
WlJJ.l. DErATI.s
)
)
ConocoPhllllps Alaska, Inc. )
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
)
COnOcJP'hillips
December 19, 2002
Alaska Oil and Gas Conservation Commission
333 West 7'h Avenue, Suite 100
Anchorage, Alaska 99501
Re:
Application for Permit to Drill C02-OS
'\
,¡ 1) \ ' \ ~ ) h t6fç-
Dear Sir or Madam: (,C Y'" " ' t..ß... V-'
. ~elll( \
ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an on~ore e.w~n well from the Alpine CD2
drilling pad. The intended spud date for this well is January 8, 2002. It is intended that Doyon Rig 19 be used to
drill the well.
CD2-08 will be drilled to penetrate the Alpine reservoir horizontally. After settin~ intermediate casing, the
horizontal section will be drilled and the well completed as an open hole injector. At the end of the work program,
the well will be closed in awaiting completion of well wor~...9nd- ilities work that will allow the well to begin --
production ./"
.1'..-'"
Note that it is planned to drill the surface hole ¡thout a diver. There have been 38 wells drilled on CD1 pad and
27 surface holes drilled on CD2 pad with no si nificant...¡ aication of gas or shallow gas hydrates. All of the wells
on CD2 have surface casing shoes within a 20 adius of the planned surface casing shoe of CD2-08. ...--
The intermediate hole section on CD2-08 is +/- 9375 ft long. It is planned to drill the section in one run, which
could take more than 8 days. ConocoPhillips is requesting that the weekly BOP test requirement be extended to
two weeks. This will ensure that the hole section can be drilled and 7" casing ran without having to trip the drilling
assembly for the BOP test.
It is also requested that the packer placement requirement be relaxed to place the completion packer 300ft TVD /'
above the Alpine formation. This will place the completion at a maximum inclination less than 650 and allow
access to the completion with standard wireline tools for future intervention.
Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information
attached to this application includes the following:
-Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a).
-Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1).
-A proposed drilling program, including a request for approval of annular pumping operations.
-A drilling fluids program summary.
-Proposed completion diagram.
-Pressure information as required by 20 ACC 25.035 (d)(2).
-CD2-08 Cementing Requirements.
-Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b).
Information pertinent to this application that is presently on file at the AOGCC:
-Diagrams of the BOP equipment, diverter equipment and choke manifold layout as required by 20 ACC 25.035
(a) and (b).
-A description of the drilling fluids handling system. R E eEl V E D
DEC 20 2002
A1as1<a Oil & Gas Cons. Commission
Anchorage
)
-',
)
If you have any questions or require further information, please contact Vern Johnson at 265-6081 or Chip Alvord
at 265-6120. ~ I (\f - " I
f) ~ 2~Ç-- c, qlî
;relY,;:
~Ohnso~ '
Drilling Engineer
Attachments
(l¡í~(b<-
cc:
CD2-08 Well File / Sharon Allsup Drake
Chip Alvord
Cliff Crabtree
Meg Kremer
Nancy Lambert
Lanston Chin
e-mail:
ATO 1530
A TO 868
A TO 848
A TO 844
Anadarko - Houston
Kuukpik Corporation
Tom my_ Thompson@anadarko.com
S. K. ALLSUP-DRAKE
PHILLIPS PETROLEUM COMPANY
711 G ST.
ANCHORAGE AK 99501
1013
,>. TG ,¡¡:' ä;~-...b..,V 2t',; 2{ C2,
.;P" ,-. ~-~ ' -f--~.' 62-14/311
~~F~'.~~:~·'~ :.-'¡~-.
~>r/tTt~ C/;" /1¿/~{S((f.:( ,íll(~(((( ¡ $ ¡c:,t? (X~)
-/-.r--T-·-<-~~/~·~~/~-- ·l-/7.'~~~-_·; '-¡=":-..l~·~~ .. . .' .
L ! ~c i,· l·t.. ""t:(¡'..c<. I.. ¡;.{LA. ,,~; ,t;.~1 / /(;'~è' -rin!! V1~ 17]
.. ...~._ _, ,'~_"_'. ". ._~.~._ __.__.'~'___~___~~ ·..._._~.Vn.~·.....·.~~._.._.._~~ ~ '.' ."..fl...._ _
\ J:\ .~. "! (: \- \:_".
~.... CHASE Chase Manhattan Bank USA, N.A. Valid Up T, 0 5000 Dollars
. . 200 White C;lay C;enter Dr. Newark. DE 19711 ," .'_ , .' . .
..." / ./ /// ,v"] /
(\/' .,.£/1· '-, / / /
ìuif:'!"il}.... .-::/) ';'~_':.. !. i L/t. ¡' jÞ', '·~ßI"7·~~-'7-" Yl /{ t(~ Wi·'
f
IT
':0:1 . .00 .l.l.': 2 .80000 l. 27 257,,1 .0 . :1
RECEIVED
DEe 20 2002
Alaska Oil & Gas Con
AnChora:ã CommisSion
'¿
-'
-'
)
)
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERlP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME
PTD#
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MUL TI
LATERAL
(If API number
last two (2) digits
are between 60-69)
PILOT
(PH)
"CLUE"
The permit is for a new wellbore segment of
existing well
Permit No, API No.
Production should continue to be reported as
a function' of the original API number stated
above.
HOLE In accordance with 20 AAC 25.005(f), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (50
70/80) from records, data and logs acquired
for well (name on permit).
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07/10/02
C\jody\templates
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumes the liability of any
protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
" WELL PERMIT CHECKLIST ' COMPANY r:"---~;¡¡f"'( WELL NAMfC,fC-f r./):/ - o<Z PROGRAM:Exp _ Dev _ Redrll _ Re-Enter _ Serv ~ Wellbore seg _
FIELD & POOL "/ ?ø/e:>r-. INIT CLASS /... ~71¥ GEOL AREA ?-7t"1 UNIT# ~Ç("J"..5·~rt ON/OFF SHORE
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . a!NN Ý'Ct'./v~~ f)r c-¡/¡ov7;' &[ ~rld /:¡.",:h ~~../ Jðri"
2. Lease number appropriate. . . ~ . . . . . . . . . . . . . . . ~ r PI ¡J ~ ill / ' 1 V
3. Unique well name and number. . . . . . . . . . . . . . . , . Y N '( j fer- of r" 11.1f--:7 ..t:)fþ r7ß
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N U
5. W ell located proper distance from drilling unit boundary. .'. Y N
6. W ell located proper distance from other wells.. . . . . . . . . "N
7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N
8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N
10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
12. Permit can be issued without administrative approval.. . . . . Y N
(Service Well Only) 13. Well located w(in area & strata authorized by injection order #.-O.A Y N ~
(Service Well Only) 14. All wells w/in ~ mile area of review identified. @,Nc:.ò/-.8f
ENGINEERING 15. Conductor string provided. . .. . . . . . . . Y N
16. Surface casing protects all known USDWs. . . . . . . . . . . N '
17. CMT vol adequate to circulate on conductor & surf csg. . . . . Y N
18. CMT vol adequate to tie-in long string to surf csg. . . . . . . . Y N
19. CMT will cover all known productive horizons. . . . . . . .. . Y N
20. Casing designs adequate for C, T, B& permafrost. . . . . . . Y N
21. Adequate tankage or reserve pit. . . . . . . . . . . . . . . . . Y N
22. If a re-drill, has a 10-403 for abandonment been approved. . . Y N
23. Adequate wellbore separation proposed.. .".. . . . . . .. . . Y N
24. If diverter required, does ît meet regulations. .. . . . . .. . Y N
25. Drilling fluid program schematic & equip list adequate. . . . . Y , N
26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . Y N
27. BOPE press rating appropriate; test to psig. Y N
28'. Choke manifold complies w/API RP-53 (May 84). . . . . . . . Y N
29. Work will occur without operation shutdown. . . . . . . . . . . Y N
30. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y N
31. Mechanical condition of wells within AOR verified. . . . . . . . Y N
32. Permit can be issued w/o hydrogen sulfide measures. . . . . tV) N
33. Da,~a ~resent,'ed. on pO,tential overpressure zones. . . . . . . . J{" ,,) fl
34. Seismic analysIs of shallow gas zones. . . . . . . . . . . . . Y /l J "
35. Seabed condition survey (it off-shore). . . . . .. ...... N '
36. Contact name/phone tor weekly progress reports. .....,. N
APPR DATE
ðt-~
APPR DATE
IIJ6Â ìl¿~/o·'!.
(Service Well Only)
GEOLOGY
APPR DATE
/f!¿ ~-~<
(ExPlon~f~ Only)
V"
CL:> 2- .... /J
(
GEOLOGY: PETROLEUM ENGINEERING: RESERVOIR ENGINEERING UIC ENGINEER COMMISSIONER: CommentsJl nstructions:
RPIIG TEM JDH JBR COT
DTS O' 2-? O!j>
/' ," MJW MLB °V~<J/o J
SFD WGA
Rev: 10/15/02 -
G:\geology\permits\checklist.doc
WELL PERMIT CHECKLIST COMPANyc;,__~íÏQ.i<"WELL NAME C.R/A' CO:> -0)<' PROGRAM: Exp_ Dev":"-- Redrll_ Re-Enter _ Serv ~ Wellbore seg_
FIELD & POOL I 2.. 0 / C> ð INIT CLASS /- ~d ~ rr r GEOL AREA ? //'J UNIT# é'JS o. ~ t< C ON/OFF SHORE a tV
ADMINISTRATION 1. Permittee attached. . . . . . . . . . . . . . . . . . . . . . . Y' N
2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y N
3. Unique well name and number. . . . . . . . . . . . . . . . . Y N
4. Well located in a defined pool.. . . . ; . . . . . . . . . . . . Y N
5. Well located proper distance from drilling unit boundary. . . . Y N
6. Well located proper distance from other wells.. . . . . . . . . Y N
7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N
J7þj ,,-, ~ _) 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N
f.JI.£- I~¿;.Z- 9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N
10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
12. Permit can be issued without administrative approval.. . . . . Y N ¡f;;-
(Service Well Only) 13. Well located w/in area & strata authorized by injection order #~ Y N ZO Z..- Z03 '(..00 - II t
(Service Well Only) 14. All wells w/in X mile area of review identified. . . . . . . . " :!L N c..tJ:z... - /-3 e-LJ J"" 3 J
ENGINEERING 15 C d t t d d ~?:l. , ~N ¡"G:, II Q "1"// ¡'. (,'IA \. )
. on uc or s ring provi e . . . . . . . . . . . . . . . . . . . WI::::...,.... ~ r\.....J
16. Surface casing protects all known USDWs. . . . . . .
17. CMT vol adequate to circulate on conductor & surf csg. . . . t
18. CMT vol adequate to tie-in long string to surf csg. . . . . . . -Y_6¥ kP ~q 1ft1~ 4-
19. CMT will cover all known productive horizons. . . . . . . . . . ~á2-N Ofù~~ UJ
20. Casing designs adequate for C, T, B & permafrost. . . . . . . N
21. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . . .' N D CI--!-I&V<- l Cf .
22. If a re-drill, has a 10-403 for abandonment been approved. . . . Y N . Aliff-
23. Adequate wellbore separation proposed.. . . . . . . . . . . . fí2 N J.. .
24. If diverter required, does it meet regulations. .. . . . . . . . -¥~y ..... N \N tU.." ~11'" \N" ~v~Ç. re<i .
25, Drilling fluid program schematic & equip list adequate. . . . . '.N VJ!l,a,,1¿ I~ "1. -i f pc¡
26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . ,N
APPR DATE 27. BOPE press rating appropriate; test to 5000 p sig. . N /LIZ <; P ?S"2.. ~ P f.,;' .
I. J/:.A ('J1'ðJo' "') 28. Choke manifold complies w/API RP-53 (May 84). . . . . . . . 7!i2 N
NU~ v '") II c.- 29. Work will occur without operation shutdown. . . . .. . . . . . êi2y , ~
30. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . 4.':'k' ¡I _, f). f\ J ·1 - D I
(Service Well Only) 31. Mechanical condition of wells within AOR verified. . . . . . . . fi2 N *- C, D I - '!> ( ; s p 0v ~ Ì-flA ~ y ø vt. J J Cv 2 . /š ¡ So OA-,[ ~tt.e. C, l ,- 0 -8 ~ ;~ r¿ .
GEOLOGY 32. Permit can be issued wlo hydrogen sulfide measures. . . . . @N
APPR DATE 33. Data presented on potential overpressure zones. . . . . . .. )1
'f ¿ - / 34. Seismic analysis of shallow gas zones. . . . . . . . . . . . . Y,' NN )vi ~ /) \
~_ /:2.../~~ 35. Seabed condition survey (if off-shore). . . . . . . . . . . . . .
( xploratory Only) 36. Contact namelphone for weekly progress reports. . . . . . . . Y . N
GEOLOGY: PETROLEUM ENGINEERING: RESERVOIR ENGINEERING
RP~
APPR
DATE
UIC ENGINEER
TEM
JDH
JBR
Rev: 10/15/02
SFD_
WGA /
MJW
G:\geology\permits\checklist.doc
COMMISSIONER:
COT
DTS 0//03/0 3
MLB O//P¿/b.,j
(
(
Comments/l nstructions:
')
)
Well History File
APPENDIX
Inforrnation of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file. ,
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPEN.DIX.
No special· effort has been made to chronologically
organize this category of information.
)
)
aoa-d5ò
JI/Pll
CD2-08.tapx
Sperry-Sun Drilli~g.services
LIS Scan Utlllty
$Revision: 3 $
LisLib $Revision: 4 $
Fri Apr 11 19:43:23 2003
Reel Header
service name........... ..LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/04/11
ori gi n . . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
previous Reel Name...... . UNKNOWN
Comments............... ..STS LIS writing Library. scientific Technical services
Tape Header
Service name. ........... .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/04/11
ori gi n . . . . . . . . . . . . . . . . . . . STS
Tape Name........... ... ..UNKNOWN
continuation Number... ...01
Previous Tape Name...... . UNKNOWN
Comments..... .......... ..STS LIS writing Library. scientific Technical services
physical EOF
Comment Record
TAPE HEADER
colville River Unit (Alpine)
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
CD2-08
501032044200
conocoPhillips Alaska, Inc.
sperry Sun
11-APR-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 2
AKMW2260902
M. HANIK
G. WHITLOCK
MWD RUN 3
AKMW2260902
R. KRELL
D. MICKEY
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
2
IIN
4E
1646
1554
MSL 0)
52.40
52.40
15.90
#
WELL CASING RECORD
page 1
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
#
REMARKS:
)
)
CD2-08.tapx
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
8.500 9.625 2889.0
6.125 7.000 12242.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTHS (TVD).
3. MWD RUN 100 WAS DIRECTIONAL ONLY AND IS NOT PRESENTED.
4. MWD RUNS 200 - 300 WERE DIRECTIONAL WITH DUAL GAMMA RAY (DGR),
UTILIZING GEIGER-MULLER TUBE DETECTORSELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4), AND PRESSURE WHILE DRILLING (PWD).
5. MWD DATA ARE CONSIDERED PDC PER MEG KREMER (PPCO)DISCUSSION OF
ALPINE REQUIREMENTS 9/26/01.
6. MWD RUNS 100 - 300 REPRESENT WELL CD2-08 WITH API
#50-103-20442-00.
THIS WELL REACHED A TOTAL DEPTH (TD) OF 18050' MD, 7024' TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (EXTRA SHALLOW
SESP SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (SHALLOW SPACING).
SEMP SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (MEDIUM SPACING).
SEDP SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (DEEP SPACING).
SFXE SMOOTHED FORMATION EXPOSURE TIME.
$
SPACING).
File Header
service name..... ....... .STSLIB.001
service Sub Level Name...
version Number.. ..... ....1.0.0
Date of Generation...... .03/04/11
Maximum physical Record. .65535
Fi 1 e Type.... . . . . . . . . . . . . LO
Previous File Name. ..... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
RPM
RPX
RPD
FET
RPS
ROP
$
#
1
clipped curves; all bit runs merged.
.5000
START DEPTH
2866.5
2879.5
2879.5
2879.5
2879.5
2879.5
2900.5
STOP DEPTH
17984.5
17991.5
17991.5
17991.5
17991.5
17991.5
18049.5
page 2
)
)
CD2-08.tapx
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE
MWD 2 2866.5 12252.0
MWD 3 12252.0 18049.5
$
#
REMARKS: MERGED MAIN PASS.
$
#
Data Format specification Record
Data Record Type.... ...... ........0
Data Specification Block Type. . . . .0
Log~ing Direction... ........ ..... . Down
optlcal log depth units.......... .Feet
Data Reference Point........... ...undefined
Frame spacing......... ... ........ .60 .1IN
Max frames per record. ... ........ .undefined
Absent value...................... -999
Depth uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum specification Block sub-type...O
Name service order units Size Nsam Rep Code offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HR 4 1 68 28 8
Fi rst Last
Name service unit Min Max Mean Nsam Reading Reading
DEPT FT 2866.5 18049.5 10458 30367 2866.5 18049.5
ROP MWD FT/H 2.52 434.86 130.583 30266 2900.5 18049.5
GR MWD API 35.45 414.39 98.125 30205 2866.5 17984.5
RPX MWD OHMM 0.22 1633.6 8.9452 30225 2879.5 17991.5
RPS MWD OHMM 0.26 1634.48 9.9581 30225 2879.5 17991.5
RPM MWD OHMM 0.22 2000 10.9153 30225 2879.5 17991.5
RPD MWD OHMM 0.22 2000 13.6793 30225 2879.5 17991.5
FET MWD HR 0.15 86.09 1.13165 30224 2879.5 17991.5
First Reading For Entire File........ ..2866.5
Last Reading For Entire File...........18049.5
File Trailer
Service name..... ..... ...STSLIB.001
service Sub Level Name...
version Number.......... .1.0.0
Date of Generation... ....03/04/11
Maximum physical Record..65535
Fi 1 e Type. . . . . . . . . . . . . . . . LO
Next File Name......... ..STSLIB.002
page 3
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
$
)
CD2-08.tapx
physical EOF
File Header
service name.... ... ... ...STSLIB.002
service sub Level Name...
version Number... ...... ..1.0.0
Date of Generation.... ...03/04/11
Maximum physical Record..65535
Fi 1 e Type. . . . . . . . . . . . . . . . LO
previous File Name... ... .STSLIB.OOl
2
START DEPTH
2866.5
2879.5
2879.5
2879.5
2879.5
2879.5
2900.5
STOP DEPTH
12216.5
12209.5
12209.5
12209.5
12209.5
12209.5
12252.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
#
#
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (s):
MUD PH:
MUD CHLORIDES (PPM):
page 4
')
28-JAN-03
Insite
6.02
Memory
12252.0
51.2
86.6
TOOL NUMBER
142827
134760
8. 500
2889.0
Ultra-free
9.80
55.0
9.0
400
,)
)
CD2-08.tapx
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
10.0
1.600
.754
2.500
1.400
70.0
156.2
70.0
70.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format specification Record
Data Record Type..... ........... ..0
Data specification Block Type.....O
Logging Direction......... ....... . Down
optlcal log depth units........ ...Feet
Data Reference Point............. .undefined
Frame spacing...... ....... ....... .60 .1IN
Max frames per record.......... ...undefined
Absent val ue. . . . . . . . . . . . . . . . . . . . . . -999
Depth uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum specification Block sub-type...O
Name Service order units size Nsam Rep Code offset channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HR 4 1 68 28 8
Fi rst Last
Name service unit Min Max Mean Nsam Reading Reading
DEPT FT 2866.5 12252 7559.25 18772 2866.5 12252
ROP MWD020 FT/H 2.52 345.52 152.908 18671 2900.5 12252
GR MWD020 API 44.8 414. 39 115.676 18669 2866.5 12216.5
RPX MWD020 OHMM 0.57 1050.5 5.56934 18661 2879.5 12209.5
RPS MWD020 OHMM 0.5 1098.3 5.60349 18661 2879.5 12209.5
RPM MWD020 OHMM 0.4 27.98 5.74272 18661 2879.5 12209.5
RPD MWD020 OHMM 0.22 2000 7.05612 18661 2879.5 12209.5
FET MWD020 HR 0.15 42.26 0.672637 18661 2879.5 12209.5
First Reading For Entire File....... ...2866.5
Last Reading For Entire File....... ... .12252
File Trailer
service name............ .STSLIB.002
service sub Level Name...
version Number.......... .1.0.0
Date of Generation...... .03/04/11
page 5
)
Maximum physical Record..65535
Fi 1 e Type. . . . . . . . . . . . . . . . LO
Next File Name... ....... .STSLIB.003
physical EOF
File Header
service name.......... ...STSLIB.003
service sub Level Name...
version Number... ....... .1.0.0
Date of Generation.... ...03/04/11
Maximum physical Record..65535
Fi 1 e Type. . . . . . . . . . . . . . . . LO
previous File Name. .... ..STSLIB.002
CD2-08.tapx
)
comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE
RPS
RPD
RPM
RPX
FET
GR
ROP
$
3
START DEPTH
12210.0
12210.0
12210.0
12210.0
12210.0
12217.0
12252.5
STOP DEPTH
17991.5
17991.5
17991.5
17991.5
17991.5
17984.5
18049.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 Electromag Resis. 4
$
#
#
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
page 6
06-FEB-03
Insite
o
Memory
18050.0
86.7
92.7
TOOL NUMBER
129046
130910
6.125
12242.0
Flo Pro
8.80
")
)
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
CD2-08.tapx
46.0
8.8
21000
3.8
.100
.058
.230
.270
92.0
163.4
72.0
72.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format specification Record
Data Record Type.......... ........0
Data specification Block Type... ..0
Log~ing Direction..... ..... ... ....Down
QPtlcal log depth units.. ........ .Feet
Data Reference Point...... ..... ...undefined
Frame spacing..... ..... ... ... .....60 .1IN
Max frames per record. ........ ....undefined
Absent value...................... -999
Depth uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum specification Block sub-type...O
Name Service order units size Nsam Rep code offset channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HR 4 1 68 28 8
Fi rst Last
Name service unit Min Max Mean Nsam Reading Reading
DEPT FT 12210 18049.5 15129.8 11680 12210 18049.5
ROP MWD030 FT/H 7.73 434.86 94.6335 11595 12252.5 18049.5
GR MWD030 API 35.45 161.22 69.7213 11536 12217 17984.5
RPX MWD030 OHMM 0.22 1633.6 14.3929 11564 12210 17991.5
RPS MWD030 OHMM 0.26 1634.48 16.9852 11564 12210 17991.5
RPM MWD030 OHMM 0.22 2000 19.2623 11564 12210 17991.5
RPD MWD030 OHMM 0.67 2000 24.3671 11564 12210 17991.5
FET MWD030 HR 0.35 86.09 1.87229 11564 12210 17991.5
First Reading For Entire File....... ...12210
Last Reading For Entire File...... .... .18049.5
File Trailer
Service name............ .STSLIB.003
page 7
)
)
service sub Level Name...
version Number......... ..1.0.0
Date of Generation...... .03/04/11
Maximum physical Record. .65535
Fi 1 e Type. . . . . . . . . . . . . . . . LO
Next File Name......... ..STSLIB.004
CD2-08.tapx
physical EOF
Tape Trailer
Service name. ... .........LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/04/11
ori gi n . . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name....... ....UNKNOWN
Comments............... ..STS LIS writing Library. Scientific Technical services
Reel Trailer
Service name....... ..... .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/04/11
ori gi n. . . . . . . . . . . . . . . . . . . STS
Ree 1 Name................ UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS writing Library. Scientific Technical services
physical EOF
physical EOF
End of LIS File
page 8