Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout169-025 ) ') From: "Peterson, Judd" <Judd_Peterson@dec.state.ak.us> Date: Fri, 05 Nov 200407:24:20 -0900 To: "'Todd Denman (denmanta@bp.com)'" <denmanta@bp.com> CC: "'csloan@gci.net'" <csloan@gci.net>, "'Jim (BPX) Chatham (Chatham, Jim (BPX))'" <chathajr@BP.com>, "'Gary (DNR) Schultz (Schultz, Gary (DNR))'" . <gary_schultz@dnr.state.ak.us>, "'Tom (AOGCC) Maunder (Maunder, Tom (AOGCC))'" <tom - maunder@admin.state.ak.us>, "'Webb Bruce (W ebb, Bruce)'" <bruce - webb@dnr.state.ak.us>, "'Winters Jack G ack - winters@dnr.state.ak.us)'" <j ack - winters@dnr.state.ak.us>, "Nuechterlein, Linda" <Linda_Nuechterlein@dec.state.ak.us>, "'Terry (COE) Carpenter (Carpenter, Terry (COE))'" <Terry.A.Carpenter@poa02.usace.army.mi1>, "'Louise Smith (E-mail) (Louise Smith (E-mail))'" <Louise_Smith@fws.gov>, "'Okakok Rex (NSB) (Okakok, Rex (NSB))''' <Rex.Okakok@north-slope.org> Mr. Denman, Attached is the final closure approval for reserve pits atOS2, OS 5, OS 7, OS 15, OS NGI, OS L-1, Eileen West End, NW Eileen 1&2, and W Kuparuk State 3-11-11. Signed copy is in the mail. «final closure approvals November 2004, BPX.doc» Regards, Judd Peterson Reserve Pit Closure Coordinator Alaska Department of Environmental Conservation (907) 269-7622 final closure approvals November 2004, 1 of 1 11/5/2004 7:42 AM ~ FRANK H. MURKOWSKI, GOVERNOR 555 Cordova Street Anchorage, Alaska 99501 PHONE: (907) 269-7590 FAX: (907) 269-7655 http://www.state.ak.us/dec/ DEPT. OF ENVIRONMENTAL CONSERVATION DIVISION OF ENVIRONMENTAL HEALTH SOLID WASTE PROGRAM November 3,2004 .r~(97.$' Mr. Todd Denman Environmental Business Manager BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 SCANNED NO\} 0 5 2004 Reference: Issuance of Permanent Closure Approval for drilling waste reserve pits at production pads DS 2, DS 5, DS 7, DS 15, DS NGI, Lisburne L-l, and exploration drilling sites Eileen West End, NW Eileen State 1&2, and West Kuparuk State 3-11-11 all located in the Prudhoe Bay Unit Dear Mr. Denman: The Alaska Department of Environmental Conservation (ADEC) has completed review and public notice for permanent closure approval of the inactive reserve pits at the above referenced production pads and exploration drilling sites located in the Prudhoe Bay Unit.. The closure applications and corrective action plans provided the required information describing the history and conditions of the reserve pits, results of required water sampling, and an assessment of the potential risks posed by the drilling waste to human health and the environment. All sites were inspected by ADEC after completion of the corrective actions to confIrm the work was completed in accordance with the approved plans. At production sites, all drilling waste was excavated from the pits for disposal by deep underground injection. The pits were tested for the presence of hydrocarbon sheening and trace metals before and after waste excavation. At these sites, the pits are closed as open impoundments. Trace amounts of residual hydrocarbon sheen may remain in some pits. Trace amounts of residual sheening is not considered a risk. Except for West Kuparuk State 3-11-11, all drilling waste was excavated from the reserve pits at exploration sites and the excavated pits were backfilled and capped. At West Kuparuk State 3-11-11, the reserve pit was sealed with a cap designed for permanent encapsulation of the drilling waste in a below grade monofill. ADEC has determined that excavated or capped pits at these sites do not present a material or probable risk to the public health or the environment. Public notice requesting comments on closure approval was published September 29 and 30, 2004 in the Anchorage Daily News and posted on the ADEC web site September 29th 2004. No public comments objecting to closure approval were received in response to this public notice. ADEC has determined that the reserve pits at these sites meet the closure requirements of 18 AAC 60.440. Closure Approval Under authority of 18 AAC 60.440 G), ADEC grants permanent closure approval to BP Exploration (Alaska) Inc. for all inactive reserve pits at the following sites: Drill Site Name API Number(s) Location Landowner r,~~(¡ Drill Site 2 Numerous Prudhoe Bay Unit DNR Drill Site 5 Numerous Prudhoe Bay Unit DNR ~\<-\0 Drill Site 7 Numerous Prudhoe Bay Unit DNR ç,: ~ CL Drill Site 15 Numerous Prudhoe Bay Unit DNR Drill Site NGI Numerous Prudhoe Bay Unit DNR ) ') November 3 2004 Page 2 of2 API Number(s) Location Landowner Numerous Prudhoe Bay Unit DNR 50-029~21 033-00 Prudhoe Bay Unit DNR 50-029-20013-00 Prudhoe Bay Unit DNR 50-029-20117-00 50-029-20014-00 Prudhoe Bay Unit DNR Mr. Todd Denman BP Exploration (Alaska) Inc. \~- \S~ \b~'-Odd r~:>-C)ù~ ~ \<o'\-Od~ Terms and Conditions Drill Site Name Drill Site Lisburne L-l Eileen West End (AKA: PBU West End 21-11-12) NW Eileen State 1 &2 W Kuparuk State 3-11-11 This permanent closure approval is subject to the following terms and conditions: 1) In accordance with 18 AAC 60.440(1), the Department will require additional investigation, assessment, monitoring or remediation if new information regarding conditions at the reserve pit facilities indicates that further actions are necessary to protect human health or the environment. 2) The approval granted by this letter is for the inactive drilling waste reserve pits only. Closure for the pad as a whole (if required) must be coordinated between the owner/operator and the appropriate land owner/manager. Any person who disagrees with this decision may request an adjudicatory hearing in accordance with 18 AAC 15.195- 18 AAC 15.340 or an informal review by the Division Director in accordance with 18 AAC 15.185. Informal review requests must be delivered to the Division Director, 555 Cordova, Anchorage, Alaska, 99501 within 15 days of the permit decision. Adjudicatory hearing requests must be delivered to the Commissioner of the Department of Environmental Conservation, 410 Willoughby Avenue, Suite 303, Juneau, Alaska 99801, within 30 days of the permit decision. If a hearing is not requested within 30 days, the right to appeal is waived. Sincerely, Transmitted Electronically Leslie F. Simmons Solid Waste Program Coordinator South Central/W estern Alaska cc: electronic only Charles F. Sloan, Consultant to NRDC, Anchorage, (csloan@gci.net) Jim Chatham, BP Exploration (chathajr@BP . com) Gary Schultz, ADNR, Fairbanks (Gary_Schultz@dnr.state.akus) Tom Maunder, AOGCC, Anchorage (Tom_Maunder@admin.state.akus) Bruce Webb, ADNR, O&G Division, Anchorage (Bruce- Webb@dnr.state.akus) Jack Winters, ADF&G, Fairbanks (Jack- Winters@dnr.state.ak.us) Linda Nuechterlein, ADEC, Anchorage (Linda - Nuechterlein@dec.state.akus) Terry Carpenter, COE, Anchorage (Terry.A.Carpenter@poa02.usace.army.mil) Louise Smith, USFWS, Fairbanks (Louise_Smith@fws.gov) Sheldon Adams, NSB, Barrow (Sheldon.Adams@north-slope.org) Rex A. Okakok, Sr. NSB, Barrow (Rex.Okakok@north-slope.org) t ~ STATE OF ALASKA ~ ALASKA .L AND GAS CONSERVATION COM; JSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: 0 Oil 0 Gas 0 Plugged 1m Abandoned 20AAC 25.105 0 GINJ 0 WINJ 0 WDSPL 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2191' NSL, 1531' WEL, SEC. 03, T11N, R11 E, UM Top of Productive Horizon: N/A Total Depth: 2191' NSL, 1531' WEL, SEC. 03, T11N, R11E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 585456 y- 5972658 Zone- ASP4 TPI: x- y- Zone- Total Depth: x- 585456 y- 5972658 Zone- ASP4 18. Directional Survey 0 Yes 1m No No. of Completions 22. CASING SIZE 30" 20" 13-3/8" 9-5/8" GRADE WT. PER FT. 154# 94# 54.5# /61# 43.5# /47# H-40 J-55 S-95 23. Perforations °Ren to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): None MD TVD MD 26. Date First Production: Not on Production Date of Test Hours Tested PRODUCTION FOR TEST PERIOD ... Flow Tubing Casing Pressure CALCULATED ~ Press. 24-HoUR RATE-" 0 Suspended 0 WAG 1b. Well Class: 20AAC25.110 ,0 Development 1m Exploratory Zero Other / (¡ 0 Stratigraphic Test 0 Service 5. Date Comp., Susp., ~ban.<J (17 12. Permit to DJiIi Number ~ ~O 3'¡Y'¿tX> ')l> 169-025 / 304-039 6. Date Spudded ~:f1.c"l13. API Number / 05/05/1969 50-029-20014-00-00 7. Date TD. Reached 14. Well Name and Number: 08/02/1969 West Kuparuk State No. 3-11-11 (WKUPST-O1) 8. KB Elevation (ft): 15. Field / Pool(s): 70' Wildcat / 9. Plug Back Depth (MD+ TVD) 5 + 5 10. Total Depth (MD+TVD) 11532 + 11532 11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/A MSL 24. SIZE 3-1/2" EUE TVD Ftl Ft 16. Property Designation: ADL 028241 17. Land Use Permit: 20. Thickness of Permafrost CEMENTING RECORD AMOUNT PULLED 21. Logs Run: IES, BHC Sonic, FDC, SNP, CDM, SWS, Seismic Check Shots CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE Top BOTTOM Top BOTTOM SIZE 5' 31' 5' 31' 36" 5' 305' 5' 305' 24" 685 sx Fondu 5' 2411' 5' 2411' 17-1/2" 2230sxClass'G' 5' 9694' 5' 9694' 12-1/4" 965 sx Class 'G' TUBING RECORD DEPTH SET (MD) 8957' PACKER SET (MD) 8945',8833' 6536' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC; GAs-McF W ATER-BBL DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Surface Perform Top Job in 9-5/8" x 13-3/8" annulus with 58 Bbls of Arcticset I ./' ~~ PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A Oll-BBl GAs-McF W ATER-BBL Oll-BBl CHOKE SIZE I GAS-OIL RATIO Oil GRAVITy-API (CORR) CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None :CõF;,P't.Êr:ON I DYr~ ! '----1 ì Vè::,';-- :.J ! , 27. " ---..-.....- . ..- -'...- Form 10-407 Revised 12/2003 RECEIVED MAY 14 2004 Alaska Oil & Gas Cons- Commis".':;1 -- 8ft. MA'+nI6OÛ1giOO~ (, ç; ORIGINAL CONTINUED ON REVERSE SIDE 28. ~ GEOLOGIC MARKERS 29. ~ ORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Shublik 8805' 8805' None Sadlerochit 8958' 8958' Lisburne 9672' 9672' RECEIVED MAY 1 4 2004 Alaska Oil & Gas Cons C '. A h . ommlsSlon nc orage 30. List of Attachments: Summary of Work Performed, Well Schematic Diagram 31. I hereby certify that the Signed David Reem e and correct to the best of my knowledge. C ~ Title Drilling Engineer Date or; 114/04- 169-025 304-039 Prepared By Name/Number: Drilling Engineer: David Reem, 564-5743 Permit No.1 Approval No. INSTRUCTIONS West KuparukState No. 3-11-11 (WKUPST-O1) Well Number GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1 a: Classification of Service Wells; Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 8: ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval), ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 ~ ~ WEST KUPARUK ST. 3-11-11 WELL P&A MARKER CHANGE-OUT Prudhoe Bay, Alaska 30-April-2004 Prepared By: Fairweather E&P Services, Inc. Page 1 of 4 .~ ~ Background Information: The West Kuparuk State No.3-II-II was a wildcat exploration well drilled in 1969 by the Sohio Alaska Petroleum Company, a heritage company ofBP Exploration, Alaska Inc. The well was tested and a dual completion was installed in 1970. Due to the location of the well with respect to facilities and structure, it was determined in 1980 that the well offered no economic potential and was permanently plugged and abandoned March 6, 1980. BPXA, in an ongoing effort to remediate old well sites and recycle the gravel for other projects, set forth in February 2004 to remove the West Kuparuk 3-11-11 pad in conjunction with pad removal projects at the old Northwest Eileen State No.1 & 2 site. An ice road was constructed and equipment was mobilized to remove the gravel. Sundry Approval was obtained to remove the surface abandonment marker and install a subsurface marker ID plate. This was done to both remove the collision hazard presented by the marker and to return the site to as close to its original state as possible, pre-exploration. The following well work summary details the well work performed on this project. Attachment I is a schematic of the well as it currently is configured. Work Summary and Daily Activities: 11-Feb-2004 17-Feb-2004 18-Feb-2004 19-Feb-2004 20-Feb-2004 21-Feb-2004 22-Feb-2004 Drive to site with crew to inspect wellsite. Meet with gravel contractor to discuss casing, rat-hole and piling cut depth requirement. Note that quite a bit more digging will be required before proper access to well can be obtained for proper cut depth. Due to Phase II weather conditions on slope, return to camp. Weather has subsided, return to W. Kuparuk site to inspect excavating progress. Wrap casing strings and put heat around casing strings for night in attempt to thaw frozen mud for access to cut point. Due to cold, all heavy equipment work shut down. Travel to well site to check idling equipment. Return to camp and standby. Return to well site. Excavator working on clearing around well for access to cut-off point. Excavator broke down at 14:00hrs. W/O mechanic and repairs. W /0 repairs to excavator. Excavator repaired, finished digging up around well. Work shut down due to blowing snow and problems keeping ice road open for access. W. Kuparuk well ready for cut. Mobilize equipment to well-site. Hold safety meeting to discuss operation, sniff excavation for gas and rig up torch to cut window in 30" casing to access 20". Section and remove interval of 30" casing, chip out cement and prepare 20" for installation of guillotine casing saw. Rig up equipment, informed by contractor that excavator was down for repair and was not available to support and remove the cut-off well head section. Prepared By: Fairweather E&P Services, Inc. Page 2 of 4 23-Feb-2004 II-Mar-2004 12-Mar-2004 13-Mar-2004 14-Mar-2004 Prepared By: ~, ~ Check all equipment, return to camp and standby. Phase II conditions on slope yet so travel in convoy. On site to resume casing cut activities. Informed by contractor mechanic that excavator would have to be hauled back to shop in Deadhorse for repair. Also informed by BPXA and Veritas that due to seismic program that was moving into area, a black-out would be in effect for region and no noise-creating activities (heavy equipment and tracked vehicles) would be allowed to operate. Decision made to abort operations in Prudhoe WOA until contractor equipment is repaired and seismic activity has moved out of area. Demob all equipment back to Deadhorse. Return to West Kuparuk site and meet with gravel contractor to discuss plan forward. Inspect site and coordinate to have original excavation cleared of snow so cut-off access can be had to casing strings. Return to Deadhorse to get equipment needed for well work. Will return to site in morning. Gather equipment for well work. Spot equipment on site and hold PJSM. Sniff cellar for gas, rig up saw and connect rigging and excavator for stabilization and picking wellhead after cut-off. Cut casing strings, remove saw and pull wellhead and casing stub from excavation. Find that there is no cement visible in 9 5/8" x 13 3/8" annulus. All other annuli appear to be cemented properly. Again sniff for gas, RU jack-hammer and proceed to remove cement sheath from 13 3/8" x 20" annulus and 20" x 30" annulus, trim top of casing stub in preparation for performing top job and marker installation. Notify BPXA wells group of need for cementing services and Anchorage office of plan forward. Finished with compressor and jackhammer so demob back to Deadhorse. Attempt to notify NS AOGCC inspectors of pending cement top job. Cannot contact, notify Winton Aubert through Anchorage office and discuss plan forward to perform top job. Given verbal OK to proceed. Prepare equipment and get 1" tubing to perform top job. Will attempt to run in to 150' minimum for displacing cement plug. Cannot get cementing equipment until following day so schedule cementing equipment, water and vac trucks for following mornIng. U sing boom truck, run 1" tubing to depth of 150' in 9 5/8" x 13 3/8" annulus without encountering any obstruction. Rig up cementers and tru~ks 'r cementing annulus. Hold PJSM with all on site. Proceed to pu 58 Is of Arcticset I cement to fill annulus, pumping until good returns obat surface. Stop pumping and observe well 5 minutes to insure cement does not fall out, wash lines, RD and release all trucks. Calculations indicate annulus was open to ~933', based on volumetric capacity of .0622 bbl/ft. Wait on cement, sniff area and cut off rig rat-hole to 7' below original tundra grade level. Remove steel debris. Make final cut of all casing strings 5' below original tundra grade level. Weld on P&A ID marker plate with operations witnessed by Lou Grimaldi, AOGCC inspector. Remove equipment from site so gravel contractor can proceed with site reclamation. Well work finished at 1800hrs. Attachment I depicts the final condition of the West Kuparuk 3-11-11 well. Fairweather E&P Services, Inc. -- ,/ Page 3 of 4 J ~ West Kuparuk State No. 3-11-11 Final Status: P&A'd 14-Mar-2004 3 'I," EUE Tubing perforated at 50' and cemented to surface. 10 6 ppg CalcIUm Chlonde TubIng perforated from 2494' - 2496' and 20 bbls Arctic Set Cmt dIsplaced 10.6 ppg CalcIUm - Chlonde TubIng perforated from 6559' - 6563'and 30 bbls "G" squeezed. TOC InsIde tubIng at 3549' Test Perfs' 6570' - 6604' Test Perfs 8880' - 8900' and 8914'- 8924' TubIng Perforated at 8904' - 8908' and squeezed 20 Bbl cmt TOC inside tubIng at 7027' Test Perfs: 8960' - 8982' CalcIUm Chlonde 120 Sk OH Plug 9850' - 9691'. TagTOCat9671' TO @ 11,532' MO & TVO I WestKuparukSt 3-11-11 r"\ 58 Bbls Arctic Set I displaced into 9 5/8" x 13 3/8" Annulus to fill to surface 14-Mar-2004 pnor to InstallIng subsurface P&A ID marker Plate. (- 933' cement) All casIng stnngs and tubIng cut 5 feet below ongInal Tundra grade level and a steel marker plate has been Installed wIth the well IdentificatIOn Infonnatlon bead welded to ItS surface. 30" 154# structural conductor at 31 " cemented wI ready mIx to surface 20" 94# BTC @ 305', cemented to surface wI 685 sx Fondue OVCollar@ 1341' TOC InsIde tubIng at 1500' . I f ¡ 133/8" 54 5# & 61# J-55 BTC Cmtd at2411' wI 780 Sks "G" around shoe, and 1450 Sks Fondu through DV Collar at 1341' ,. TOC InsIde tubIng at 3549' I Attachment I / Production Packer at 6536' 95/8" DV collar at 6986' ,. TOC insIde tubIng at 7027' ProductIOn Packer at 8833' Production Packer at 8945' TubIng Tall at 8957' Fish @ 8977', Otis "WB" packer, gauge ring & junk basket Bridge Plug at 90 I 7' 95/8" 47# from 6952' - 9969', and 43.5# from surface to 6952'. Cemented into place wIth 635 Sks "G" around shoe and 330 Sks "G" through DV Collar at 6986'. I Fairweather E&P ServIces, Inc. I Drawing Not to Scale I Rev 2.0 DHV 5/3/04 Prepared By: Fairweather E&P Services, Inc. Page 4 of 4 20-January-2004 Commissioner(s) Alaska Oil and Gas Conservation Commission 333 W. 7th Ave., Suite 100 Anchorage, AK 99501 / Re: Application for Sundry Approval to change out P&A Marker: BP Exploration (Alaska) West Kuparuk State No. 3-11-11 (PTD 169-025). Dear Commissioner(s): BP Exploration (Alaska) Inc. (BPXA) hereby applies for Sundry Approval of its plan to change the current abandonment marker on well West Kuparuk State No. 3-11-11. The surface monument will /' be replaced with a subsurface marker plate. The anticipated commencement date of this work is mid-February, 2004. BPXA will be recovering the gravel from the West Kuparuk State No. 3-11-11 exploratory drill site for recycling into other projects. BPXA wishes to eliminate the collision hazard presented by the marker / post after pad gravel removal. After a small near well-bore excavation, the casing strings will be severed and a subsurface welllD plate will be welded over the casing stubs at a minimum of 3 feet /' below original tundra grade level per 20 AAC 25.120. After the marker has been changed out, and the gravel has been removed, the surface will be graded and contoured to more closely resemble its natural state prior to drilling operations in 1969. ,.-- A mound will be left over the well excavation point to counter the effects of settling and prevent ponding. Pertinent information attached to this application includes the following: 1. Two (2) originals; AOGCC Form 10-403 for the well; 2. Two (2) copies; Marker removal and change-out program for West Kuparuk State 3-11-11 with schematics showing both the current configuration and the proposed changes. /' If you have any questions or concerns, please contact the undersigned at 564-5111 or Duane Vaagen at 258-3446. Thank you for your help. rJJ;c~ David Reem BP Exploration (Alaska) Inc. Attachments cc: Jason Moncrieff Duane Vaagen 5Ct\tNJNED FED :1 8 200i~ 1. Type of Request: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 20 MC 25,280 Operational shutdown Plug Perforations D Perforate New Pool D 4. Current Well Class: ~ c, A 'll ~ 17A7c'J4- /!) /7S 2/ S /Cf- Abandon Alter casing D Change approved program D 2, Operator Name: BP Exploration Alaska, Inc, 3. Address: P.O. Box 196612 900 E. Benson Blvd, Anchorage AK 99519 7. KB Elevation (ft): Suspend Repair well D Pull Tubing D Waiver Stimulate D Time Extension D Re-enter Suspended Well D 5. Permit to Drill Number: Exploratory [!] 169-025 / D 6. API Number: /' 50-029-20014-00 Annular Dispos. Other 0 Development Stratigraphic D D Service Casing Structural Conductor Total Depth TVD (ft): 11,532' Length 9. Well Name and Number: West Kuparuk State No. 3-11-11 / 10. Field/Pools(s): Wildcat PRESENT WELL CONDITION SUMMARY Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): 0.0' P&A'd 0.0' P&A'd Surface Size MD Junk (measured): 69,56 8. Property Designation: AOL 28241 11. Total Depth MD (ft): 11,532' rvD Burst Collapse Production Liner 31' 305' 2411' 9694' N/A Perforation Depth TVD (ft): 30" 31' 31' 154 # Structural 20" 305' 305' 1530 psi 520 psi 133/8" 54.5 & 61 # 2411' 2411' 2730 I 3090 psi 1130 I 1540 psi 9 5/8" 43.5 & 47 # 9694' 9694' 7510 I 8150 psi 5600 I 7100 psi Surface Intermediate Perforation Depth MD (ft): P&A'd P&A' Tubing Size: P&A' Tubing Grade: P&A' Tubing MD (ft): P&A'd Well P&A'd: Yes Packers and SSSV Type: Packers and SSSV MD (ft): N/A 12. Attachments: Description Summary of Proposal Detailed Operations Program D BOP Sketch D 14. Estimated Date for 13. Well Class after proposed work: Exploratory M Development 15. Well Status after proposed work: Oil D Gas 0 WAG D GINJ 0 D Service 0 Commencing Operations: j¥l icP ~ FebruClY' !1W2004 16. Verbal Approval: D te: Commission Representative: Plugged WINJ D D Abandoned WDSPL 0 0 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Nam eKE E.N1 Title Signature Phone :;{,4- 5- 43 COMMISSION USE ONLY Contact Oavid Reem S'y-, Wells Date Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 3t!:>Lf-03 Plug Integrity 0 BOP Test D Mechanical Integrity Test D Location Clearance ¡ø' RECEIVED FEB 0 4 2004 Other: Alaska Oil & Gas Cons. Commì;r;}:ïon Anchorage COMMISSIONER BY ORDER OF THE COMMISSION Date: INSTRUCTIONS ON REVERSE ORIGI~I!.t~L RBOMS BfL Submit in Dupli cate fEB 0 ~ 200't Well P&A Program: West Kuparuk State 3-11-11 PTD: 169-025 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. File and insure all necessary permits and applications are in place. Notify AOGCC of pending well work operations. Excavate around well and remove debris as necessary to access casing. Excavation to be 5' minimum below tundra grade level to access casing for cut ----- off point at minimum of 3' below original tundra grade level. Inspect for vent or other to verify no potential for trapped pressure. If not possible to verify potential trapped pressure, hot tap casing as necessary for /' safety. Well is P&A'd so no pressure other than thermally induced should be present. Cut off P&A marker post, RU excavator or crane to support wellhead while cutting. Cut and remove upper portion of casing strings to minimum depth of 3' below /' original tundra grade level. If requested, allow AOGCC inspection of annuli prior to welding on of subsurface /' P&A well 10 marker plate. Weld on well P&Amarker plate with following information: Well Natne: W. Kuparuk St. 3-11-11 ",/ Operator Name: BPXA PTO Number: 169-025 API Number: 50-029-20014 Allow AOGCC inspection of marker installation if requested and backfill excavation, finish gravel work and leave mound over top of well excavation to account for settling and prevent future ponding. File Form 10-404 and well work report indicating final well status with AOGCC. /" Return in summer with AOGCC inspector after thaw for visual inspection and obtain final site clearance. dhv/fairweather/rev 1 W. Kuparuk 81. 3-11-11 Marker C/O 1/30/2004 Page 1 of 1 West Kuparuk State 3-11-11 Current Abandonment Marker Configuration Tree and valves removed, wellhead intact with marker post installed Original Tundra Grade Level I ATTACHMENT I West Kuparuk State 3-11-11 Final Abandoned Condition After P&A Marker Changeout Original Marker ID post and wellhead removed. Casing severed 3' minimum below original tundra surface level. 1/2" X 24" X 24" ID plate welded over cut casing strings. Excavation backfilled and pad gravel removed and recycled. ID plate to contain following information: West Kuparuk State 3.11.11 BPXA PTD 169-025 API # 50-029-20014 Original Tundra Grade Level t3ftminimum I ATTACHMENT II ~, ~, PLUGGIN~ & LOCATION CLEARANCE REPORT State of Alaska . ALASKA OIL & GrlS CONSERVATION COMMISSION PTD No, ~ <; -a()~S- !.:ease ~~\... d-~d~ \ ?1esc=-ë.~èl21 :!'a ?ile: -~?Z No. 50- C)ð,,- ,- (700 \ L-\ Well Na!Ile 'N .,\L'-.)~~\... ~~~ Op e:!' at 0 r ~ ,,\~ <"':~-\<::. '<:; \ \ .) ~c-cê.t:..on \5'd\ ~~\. d\"\\:. ~C'-:>'- . ~~\\-\\ \ I Spuà; Sfs- <0" Abnå Date TD: ~/';¿)-Cc~Q ,t\S~. Completed ~~-\\\~-~\\~ \..) '"'"" "J:\"",>~~~ "::>/'3Þ- ~a ~I ~a(~\\ ~/~- Co~ \ Note casi:!J.g size, wt, deoÓ, c:::lt vol, & o=oceàurE. ~ ,;) 0" C) '"-\" \-\ - \...\ 'V ~ ~ C S' c:.....V\. ~ """1 f, ~5 ~ ~ ~\"O ~ Sfc C.sg: \~~l~ s"\,5/~\.fiL \-SS~rl~\\ "'>~ \'~\.\\. \~\~ "'~a~...<..:, d~~'s \'-\S'Os:~\ô.i Long C.sg: SS{tfs 4~sl"\~\r;i. ~-<;Çc- ~~~ W~ bc..Ç;b' \....~~ ~~S<;,,- ~ ~~~ ~~~C~ Liner: ~~ . ¡ Per:: ':'.:lterTals - tops: ~q ~ ! <0$'\0 I Review the well file, and, comment on plugging, well head statüs, anà location clearance - p~cviåe loco clear. code. Plug~: 0\\ ~\~~ <-1b$O- C;~~\ '-' /\<1O-:J- ~().~~Q ~~~ \ ~~<>~~,~ ~~~ \c ~caO\?;, r. ( +...;~\,"<;. C-«.."'~\.~~ ~'" \(\C1~~ ~~a~- '\~")'\ ~, ~~\(\ü~~ C:, \~~~ ~~- 6Cc- \""'\ ;), r' ~ t S ,..j ( \ 4~ - 'ì"'S~ - bSb~'" ~() .~ \'" 'I> c\c..,,-.,. "" ç;>''Vt "'C>.~ _.cO - d '-\c..Io'" ðO \, \, ~ 1:\') \'() ""'- ~'t"~'Ï'\ ~ ~\J\-z\ - ~' -.,.¡, ~ ~ ~ \~~~ \ú~~ ~ \ ö...~'-J \ ~~ 'J ~ \~ ~ ,.. Well head cut off: . j:......... r ...~\';. ~~"'~. ~<t'\~~ ~\ c..~\cw. Mar.lcer 'post or plate: "()~+' .' Loca 1:::' on Cl earance : lcca.\ '\ e::,"-. c.\eC>.. J?\ \:,"( 'è:c\-'~ ~ \t ç <; {-~ _.s;. \. Conclusions: 'NÙ\~ü~ ~~ ~~ r'\~~~ ~ >~~~\~~~ ~\~. \.Jc \"'Qcr-;.~"\<:,\,", ~-~Q. D~ "S/ð 'f \~"'>í'k e...t"\~ù\'-1~ Code '-<.. - .~ Signed !R?'Y?~ ~k-oQ Date . . ~ r",,, V" .,.., ,,., rt8 ""'~ J'""' °Dl:> Y ~IÑIJI#~ þ ~ .in:::... 7'7'" 0 '--. , ç; ø\f1 &4¿f ¡ð<?r>ö7f ¿/,J. ...-' }411r ! ~;~~4;~Z~ (fY~KUP=== = .-w~. ~ ~J 1. Under APE EOO149 for $700,000, Irobi1ize equipnent for off-road operation: a) b) c) d) e) f) g) Wireline tCX>ls to pull Otis AO safety valve Wire1ine tools to perforate 9.3# 3 1/2" tubing (4 tiIœs) Tankage to haul heated fresh water (+100 bbl. total) Canent unit to mix and squeeze canent Canent pod for bulk. canent (4 jobs, 150 sks max.) Mast truck for lubricator/wìreline work Tankage to haul CaC12 brine and heat (150 bbl/job max.) 2. Rig up lubricator on tree, pull"AO" safety valve at 524'. RIH with 2" Hyperdane 4spf 4' and shoot tubing at 8900' +. Notify State to witness cañenting. -~a9Q~.- R90¡ # Rig upcemanting unit, fill tubing and break down perforations with wann (500+) '3f) ~ CaC12 brine (78 bbls.), 5 bbls. fresh wann water, 100 sks Class G canent +~to. 3-f' 1% friction reducer + retarder for TI' = 2.00 brs. @ 2000p (Density = 15.8 ppg., Yield = 1.15 cu.ft./sk., Water = 5 gal./sk.), 5 bbls. wcmn fresh water, and 56 bbls. CaC12 brine (to displace cement to 7000'). T wJf:"l:.7"~~ 3. """,,~ ?I8,¿'ð? ~ ~Ol.) ~S':r. ~: 'r 11"1 3-f NOrE: Once injection 'is established with CaC12 brine, be prepared to keep fluid and canent noving before pumping fresh water or cement since freezing through the pex:ma.frost might occur. Limit surface pressure to 4000 psi. ,,~ lJiYh ~..tf '70,,?'~:i>,~~ rtr'! 1.'..30#=~-)After vœ pf 8 brs., RIB with wire1ine tools and tag canent.~RIH with 2" :J-7 -1.;:4'3-%"1 . Hyperdane 4spf 4' and shoot tubing at 6560':!:. ~ ?.r~-9'- (,~t;,J: . 5. Break ~ perforations with warm CaC12 brine. Pump 70 bb1s. watm (5?O+~ 1.1!;"O IiIÞH :ZAÞJ"~"'/Q,..J /' CaC12 brUle,S bbls. waDIl fresh water, 150 sks Class G caœnt + 1% fr~ction~ ~~ F .4;9-~ JI!JP~ reducer ('IT = +2 hrs. @ l250:F, Density = 15.8 ppg., Water = 5 gal./sk., Yield " e 1,,"0 þ I'Cz. = 1.15 cu.ft./sk.)" 5bbls. wann fresh water, and 25 bbls. CaC12 brine (to ,..:~..Il" 6.1 displace canent to 3500') . J~"t <; I /02 :Oó ~ 3-~""Pð I:IÞt!Þ -~; ~ G., After vœ of 8 h,rs., tag canent top with wire1ine.~RIH and punch tubing at ' /l1H ,ß~r 2500' with l~ holes/(9.3# 3 1/2"). ~ ~'9'" I - = if tJ,¿ ~ Þ:.."..,..., 7 . Circulate in 25 bbls. CaCl2 brine, 100 sks pema£rost' or Arcticset cement..r<- II ~:~ .3~r' (Density =15, Water = 3.5, Yield = .93, 'IT = 1.30 @ 50Dr'). Displace with 13 bbls. CaC12 brine (to 1500'). Close in tubing and fill annulus with 10:!: bbls. brine. (Fluid mayor may not circulate while punping brine and cement.) ¡J¡Þ/ I~:/J .) <8 . ~...g=4ms~-' æld,..-t:ag~~nt-. ,Punch tubing 50' below ground level with 10 holes ,i::' ? ' fill tubing and annulus with PennaErost or, Arcticset canent. --E:- / : 00 )I'M 3'[" ,Jø- 9. Remov:e tree and all possible wellhead fittings, tag with well number and store on Mobil storage pad. Weld up all openings and install 4 1/2 It marker post -E:- 7:;~.ð1 with top closed, 4' + long and the following information bead welded on: 9-. soma 3-11-11 1521' FEL, 2176 I FSL, See. 3, TllN, RIlE, UFM Reccmnendeà: ~ I./t Approved: ~~ > .;kS/?l /' / A\1R: ja 2/25780 ,~ . '\ ,--.. ('-"" " October 2'0, 1982 Mr. R1 rk ti' . She rwood Amoco, Production Company P .O.!Jox779 ' . ~n9hç)rage', Ala ska' 5) 9 510 Re: Preparation of Petrographic ~hin-Sections from Core Chips in State Well Sample Library , > ','0 '," .~;. - :10&. - <, ~~""':,,- . ~l:~'~'. ;:!:"~'Pursuant to our October 14 and 15 discussions and your October 15, '.;1.i~~.{:;'~, C:~~19112,;>letteJ:,"permission is hereby grantod ~o Amoco Production, -~:It!;Ii,)i~~:ë;:'COÍQpAny-to'extract 'a 'maximumi CQ. .of core material per foot of~ '-':~,;.' - core from 'the. State 's set of core chips for the purpose of preparing . [ 15 to<25 petrographic thin-sections at selected depths in the following wel~s, subject to the below listed conditions I , . Dea.r t1el1 Interval , Sample -Set No. 1;.,285 "., 420" ,'tJ402 ,.466 : ,'485 /,-"223 {,;.> ,i"ARCO W. SakRiver'S,t.I1 ,'Sohiow. Sax 25667)4 . SohioW. Sak.25645 19 SohioW. Sak 25655 114 ARCa W. Sak 25590 '15 'Mobil W. Kuparuk St. 3-11-11 (To be determined) Q " " " " ¡ ! t I ' 1 Cuts of the core chips from the State collection are to be extracted only from those individual envelopes or ~gs in whic~ total content of core chips is greater than 10 cc. (No cuts are to be extracted if the volume of material in the individual envelope is less than 10 cc.) , will provide the commission with a list of the in the well from which material ~s extracted. event' that you" wish to prepare blue-ðyed thin- sections, it is requested that the core material be impregnated under vacuum ~dth blue dye epoxy prior to mounting on the ~hin-sections. Mr. K1rJ<: W. She~'~ " 2 ......../"'; -~ obe r 20, 1 9 82 " / All petroqraphic thin-sections prepared are to be received by the Commission by approximately December 1, and are~to be transmitted direct to tho Commission not, exam1~edbY;~,out8ide partios. All residue and excess material is to be' returned to tho Commission: ,no slide or core material 18 to be retained by Amooo. ' No additional slides are to be prepared nor analyses made on the core material without specifio r~ior consent from' the Commission. " ' Amoco shall bear all cost. entailed. We are pleased to work wi th ¥ou in this beneficial project and look forward to your company s exercise of care and good judgment in the handling of this limited quantity of valuable well material. I know we both ~nder8tand that the Statc's woll Gample library is public property and that granting Amooo pe1~iss1on to extract portions of rreterialfrom 'thi .',library 'for the purpose of preparing the indic:a.teðthin-eoctions enhances tbe value of the library and 1.':Jin'the . public interest. ' ' 'Sincerely, ",.£¿£! ,{/oÞ William Van Alen Petroleum'Geolog1st.,. ' Mr. SoottMcCoy ,(Project Geoloqist Arooo Production Company 1670 Broadway Denver, . Colorado 80202 >~ ;~~h ,.....-'-- , ~ }1ay 12, 1982 ,~ .. -:. - ~ ':1 Mr. Ernie Robertson Riley's Dat8ahare> Internation~l 2525 Murworth, Suite 119 Houston. Texas 77054 Dear Mr. Robertson: As per our telephone conversatiQn today I am writing to you to deßcrib~ several minor prob leL1s we encountered in reading the computer tape6 you have sent us. The da ta on these' tapes is the dig! t1zed log da ta for 27 wells we sent you in February. Con! ident tal Code 14019 Curve: Interval: Problem: RHOB DEN 6550-7000 Scale recorded appears to be 1.0 to 2.0 instcöd of 2.0 to 3.0. In some of this interval the reuular scale is needed but there is also aome footage recorded at ~he alternate scale of 1.0 to 2.0. See attached log. Heat Sak 1/5 Curve: ILD DIL Interval: 3000-3500 Problem: Recorded da ta appears 8S though it wat; recorded Ii t the ..---.... .. wrong scale setting 01' was not recorded logarithmic (;;::t KUrsrukV ~'----->-_._-~":- > Curve: DT AV andGR AV Interval: 1900-5250 . Problem: These two curves are duplicated on the tape but apv~ar to be for two difÍerent intervals. The interval we read from the first set 18 for the interval 1900 to 2800 fee.t. .; þ' \~e8t Sak f/6 Curve: Interval: Problem: '\~ ¡ , ....."", -2- RHOB DEN 2400-2700 and 3600-4300 t.Je sent you the ~trong log. We have enclosed the CFDL from which this curve is to be taken. From 2400 to 2700 feet the density curve is 2' too low; that is, 2400' DIL - 2402 DENS. From 3600 to 4300 feet, no depth correction 18 needed. If my description of the problems is confusing or if there is anything else you need to alleviate these prob lems, p lcase give me a call at (907) 279-1433. ~.1Q~ej e,9'. <""., )f;;," ---/ .,,1 ^ '/'1,., 0 / Jo'rí'~ Baxal1dall System Analyst Attachments: -..-~._...,-'- ,.~ . -.:: .f ~~~ ~,^,'~'~ '>" ]C,t:_1;~t~F"::.,~ ',;{. '\ ~.}~, '---... , ..... () 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 November 3, 1981 Alaska Oil & Gas Conservation Comnission , 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Re: MP West Kuparuk St. 3-11-11, See. 03, TllN, RIlE, UPM. Gentlerren : In resfOnse to your letter dated October 23, 1981 re subject ~ll, enclosed, in duplicate, is Form 10-407, Well Completion or Reconpletion RefOrt, for the aOOve-narred well. This contains our subsequent rer:ort of àbandornœnt of this well. Yours very truly, R. H. Reiley District Drilling Engineer m::m encs cc: Well File #17 RECEIVED NOV 0 5 1981 AlaSka Oil & Gas Cons. Commission Anchorage , I ,. { æ-.... , ì~ STATE OF ALASKA ~, ALASKÁ,-.,.L,. AND GAS CONSERVATION C~"" ..<V1ISSION ~WELL COMPLETION OR RECOMPLETION REPORT AND LOG .1 . Status of Well Classification of Service Well OIL C' GAS 0 SUSPENDED 0 ABANDONED ~. SERVICE 0 2. Name of Operator 7. Permit Number Sohio Alaska Petroleum. Company 69-25 3, Address 8. API Number Pouch 6-612, Anchorage, Alaska 99502 50- 029-20014 4. Location of well at surface 9. Unit or Lease Name 1521' V'ÆL, 2176' NSL, Sec. 03, T1lN, RllE, UPM At Top Producing Interval 10. Well Number W. Kuparuk State 3-11-11 At Total Depth 11, Field and ,Pool Vertical Well .5. Elevation in feet (indicate KB, DF, etc.) /6. Lea~~Si9;~~O¡{nd Serial No, Wildcat KBE = 69.56' 12, Date Spudded 13. Date T,D. Reached 14. Date Comp., Susp, or Aband. /15. Water DePth, if offshore 116. No. of Completions 5-5-69 8-2-69 3-6-80 feet MS L 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19, Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost 11532' MD Surface YES 0 NO~ None feet MD 22, Type Electric or Other Logs Run IES BHC Sonic, FOC, SNP, CDM SNS, Seismic check shots 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 30 154 31 36 20 94 H-40 305 24 685 sks 1-1+ 3% NaC 1 Fondue 13 3/8" 54.5&61 J-55 , 2411 17 1/2 2230 sks Class G 9 5/8" 43.5&47 S-95 9694 12 1/4" 965 sks Class G 24, Perforations open to Production (MD+ TVD of Top and Bottom and 25, TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 3 1/2" EUE 8957' 8945'. 8833' & 6536' None 26, ACID, FRACTURE, CEMENT SQUEEZE, ETC, DEPTH ,INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED See Abandornrent 1000rations a+:tached " , 27. PRODUCTION TEST Date ,F irst Prqduction Method of Operation (Flowing, gaslift,etc,) Date of Test Hours Tested PRODUCTION FOR 01 L-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO :') ,"" '.' TESTPERICJD . Flow Tubing Gasing Pressure CALCULATED OJ L-BBL GAS-MCF WATER-BBL OIL GRAVITY.API (corr) . Press. " " 24-HOUR RATE. ,.' 28, CORE DATA 'Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED >, - NOV 0 5 1981 Alaska Oil & Gas Cons. CommIssIon Anchorage , ' '; Form 10-407 Rev. 7-1-80 Submit in duplicate CONTINUED ON REVERSE SIDE í~ /~ 1 ìnC¡U\J8 intc:".v'dl t(:~;u::d. p¡'e~;)U;t Uci<a, .; -¡i\.'ic".. ,;. jll ~) " d \.' °L V, TRUE VERT, DEPTH GaR, and time of each phase, MEAS, DEPTH M:M 31. LIST OF ATTACHMENTS Abandomnent Operations 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed \" ~ .~( District Drilling Engineer Title Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas I njection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". ~... r-\ -.. WELLIDBIIr-PHILLIPSWESTKUPARUK ST. 3~ 11-11 ABANOONMENT OPERATIONS March.1980: Pulled SSSV. Pedorated tubing with 4 shots per foot from 8904' to 8908'. Established injection rate with CaC12 brine and squeezed 100 sks Class G cenent with 1% friction reducer. Displaced cerænt to 7027'. Perforated tubing with 4 shots per foot from 6559' to 6563'. Established injection rate with CaC12 and squeezed 150 sks Class G cenent with 1% friction reducer. Displaced cement to 3549'. Perforated with 10 shots at 2490'. Established injection rate and punped 100 sks Permafrost cement. Displaced to 1500'. Perforated tubing at 50' with 10 holes. Pumped 29 sks Permafrost cenent and circulated cenalt to surface. Nippled down Xmas tree, installed marker p:>st and ~lded all openings shut. The follCMing inforn:ation bead-welded on marker post: SOBIa 3-11-11 1521' WEL, 2176' NSL, Sec. 3, TIlN, RIlE IDeation cleaned. RECEIVED Nov () 5 .1 r.:/~' ì Ilafa Oil & Gas CO A..."...^~ fJs, CO'1"1' ""IIJIU{8ge , J/I;S!o(¡ ~ - October 23, 1981 Sohio Ala.ska Petroleum <Zompany . 3111 .C. St:reet Poucb 6-112 Andu.)J:&g. , Al..ka 99510 Re. West Kuparuk S~. 3-11-11, Sec. 03, Tl1N, RilE, O.M. Gentlemeru Our representative iD8pected t.his site on August 31, 1981 and it wa.found 'tha~ clean-up w.. acceptable, coneeQuently final abandonment of West knparut State 3-11-11 is approved. However, the proper form 10-407, Well Completion or ReCOIflpletion Report and Log, was nø~ filed and this well is being carried as 8uapended. Pleae. eubld.1; at førm 10-407 for the abandonment of this well. Sincerely, (L; to!lnie Smith Comøisstoner . StATE of ALASKA /~ ALASKA OIL AND GAS CONSERVATION COMMISSION TO, rHOyle H. HamiltonA~ Chairman 'P",I Thru: Lonnie C. Smith {6) Commissioner FROM: Bobby Foster~i-, Petroleum Inspector HENQAAN£1H DATE. September 30, 1981 FilE NO TElEPHONE NO. SUBJECT Inspect the Drill Sites Listed Below for Final Approval of Well and Location Abandonment August 31, 1981 thru September 2, 1981 - I traveled August 31, 1981 where I met with Jack Barr, Judy Golding and Jerry Steger, Sohio representatives and inspected the following locations for approval of final location clean-up and well PIA. Mobil Kuparuk State 1 Kemik Unit M.P. Tract M. P. Kuparuk West Kuparuk State S OC AL West Sak Reindeer Island 13-21-11-12 #2 13-15-11-12 9-11-12 3-11-11-- 33-29-12-11 #4 Test well I recommend to the commission that the locations and wells be accepted as PIA. !~ 2 0 A,~C ¿). 1\ln'iCLl~ ¿ F I LI~ INFO IU'!AT ION: Operator I\dd rpss GA t:>... Surface Location of Well /5 .3 ~ Ft. F E L. ..:( L 91 F t. F.s L, Sec. ~ ,T-LL tl.., R1L~, LI:f!fC , /' "\ 8-8 -"1 20 A^C 25.120: h'ELL 1\ L\:~DO;'J::urr ;'í¡\¡'~r~LI'~: D i i1. S tee 1 Po s t (4" Ì'1 in. ) ¿/-):t.,.ø. Height Above Final Grade Level (4 I ì'lin.) Top of Harker Pipe Closed with: CemC'nt Pll.1[; Screw Cnp Set : On \~ e 11 He a d /' ,0 n C II t 0 f f C; I sin g , I n Co n c r c t e PIli g Distance ßelow Fín;¡IGr;n!e Lc>vel A~¡,)~ Ft. ilì. Side Outlets: All Valves and l';irr1es f\clIloved A 11 Openings Closed ie', \.1 i t h, B 1 in d st.¡ e, 5., \.h t h Cement INFO R/-1AT I or~ BE,\])\~f. LI)E ) ) J I{ 1':C'n~ L Y TO ;'1 \ 1,;\ CIZ POST: (List hl1ere Different from File Inforll1ation) Opera tor No¡,...) v \.,1e 11 N u m her Ft. r~L, Pc lìì1 i t ì'~(1. _4?...!L-:: ø:'<S . Unit or Lr;;:'~ ~~n~o5ü¡;;;~it~);rk s-l . Field & I'O~~ll ¡;¿'¡rf¿;;¡ /J Length (10' ¡'lín.) ¡Vo /0 ~,'clds ~ , Other t;n i t () r LCé1~e t\~l1\1C . Sur LIce Loci1t,i.on of ¡':l!Ll: Ft., F_L, ,Sec , T- -' R- -' -1-1 , 20 A¡\C 25. 1 70: LOCAT ION CLEMj- U P PITS: . --nlled In~, Liners Remuved or I~uried ~., DcL>ris Rell1oved~ SURFAC[ OF PAD AJ~D/OR LOCATiO::: Eough -' Smooth -' Contoured ~', 1"la t Other Compacted CLf.i\ì~ UP Of PAD Ar:C/OR LOCATI():'~: ¡. Clean .r , Pipe Scrap -' Iron Scra¡f ,hTOOÙ -' ì'1ucl \- Paper -' Other -' Cement -' SUEROUNDI:\::; ^REA: i Wooded -' Brush -' Tundra v/ , Grass -' Dirt Sand ----' Other --' Crilvcl -' CO~JDITION SUlZfZOUNIJP¡C; l\rU~A: Clean V"", Trash from Site --' Tf(~Cù (1[~d/or Brush [rDln Cleiir in¿; Site: Other ì r -' . I \ CON\)(TION ^CCESS EOAn A~D CleAn. Rough. Trees and/or Brush from Other ACCESS ROAD: /YOAl0 Dirt -' Gravel -' Ice -' Other I SURRot:iJDnJC': ;J~JCJ¿' Smooth --' Trash"from Opcr;llions --' C 1 ear in g R tV 1(i -4----' S poi 1 fro 111 C 1 ear i 11 g R 0 (1 d t , ' -' RE~1AlN ING TO B!~ DONE: I/D AI f.J .... No Final Inspection 1./ ¿~' 'S ( IMTE 6," ~,I." 8 / RECO~H'ŒND INSPECTED BY OS/26/81 0 p ~, ,..\ ~OHI~ SOHIO ALASKA PETROLEUM COMPANY ~ j111 ¡,'STHELJ ANCHOHAGE.ALASKA August 17, 1981 Mr. Lonnie Smi th Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Smith: _._.~-.~------ ---- TELEPHONE (901) 27fj.~) 111 MI\I'- POUCH 6612 ANCHORAGE, ALASKA 99502 In compliance with State Regulation 20 AAC 25.170, attached are Forms 10-403, Sundry Notices & Reports on Wells, for the following wells. These notices request that the wells remain in suspended status. Term Well B (22-20-11-13) Term Well C (34-03-11-12) Chevron Tract Well (23-18-11-12) MPC Tract Well (21-03-10-12) PBU MP 43-31-11-13 MPC 11-33-11-12 Getty State #1 (02-10-13) MP Tract Well (32-30-11-13) PBU MP 22-31-11-13, No.2 West Sak 25645 #9 West Sak 25548 ill West Sak 25655 #14 West Sak #16 West Sak #17 Kuparuk State 22-11-12 Sag Delta #1 (33-12-16) Sag Delta #2 (10-11-16) Sag Delta #2A (10-11-16) Sag Delta #3 (35-12-16) Sag Delta 34633 #4 Sag Delta #5 (36-12-15) Sag Delta #7 . Sag Delta #8 Niakuk #1 (26-12-15)-abandoned Niakuk #lA (26-12-15) Niakuk #2 - abandoned Niakuk #2A (23-12-15) Niakuk #3 (13-12-15) R[CEIVED AUG? 6 1981 AIZlska Oil & Gas Cons. Commission Anchorage Page flwo We would like to have your field inspector present sanetime during the week of August 31 - September 4 to accanpany cor representative for final location inspection of the fol1ooing wells: Challenge Island #1 Reindeer Island Stratigraphic Test #1 West Sak #4- KemikUpít #2 _.~s~~~~. Hurl State 5-10-13 Socal~obil 33-29E (29-12~11) Kuparuk State 33-11-12 Kuparuk 9-11-12 MPC 7-11-12 Kuparuk'State 21-11-12 MP Tract Well 13-15-11-12 Yours very truly, ~ P. R. Judd Manager Drilling PRJ:JLG: ja Attachments - cc: Well Files CC# 37,291 ';;[CrIVED Iii j (: ',:' '.', f ('¡ ¡t ¡ '-- ,J ' C' 1 .,' (J ¡'1r¡r.I'~ l)/' t> (" " ,-. .. , C. . ..' ,)'d C: 1,,' t,!:II~.. Ú" (n"~l:J"'''1 ) ow.. \'., l~nc.l()r (.LtC ~ ,~ .. ( SOHIO ALASKA PETROLEUM COMPANY .~.._----_._- . A. R~ @ d. ) æ~ ';/2.G/80 I March 20, 1980 CONFER: FllF: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Atm: Mr. H. H. Hærilton Gentlemen : Enclosed, in duplicate, is Form 10-403, Sundry Notices and RefOrts on Wells, for the following wells: Kuparuk State 33-11-12 Kuparuk State 24-11-12 33-29E 29-12-11 P'ö/Á) (West Kuparuk Stab~ 3-11-11 These Sundry Notices contain our subsequent refOrts of the abandonment of these wells. Yours very truly, SORIa AlASKA PErROLEUM CCMPANY ~¡:<J A. M. Reid Acting District Drilling Engineer AMR :rn1h Enclosures cc: Well File #17 D r-,v-' r' ~ , " !(' J) , t- '; r"." g :! ~... . . ¡¡ '<. I. ." ~ f ',f , ~ ..' ~~ ~1 qç;J1 ",A c) :'1vW" AIC:.s!<a Oi; J\n:~¡¡1. \ ~, .~ / SOHIO ALASKA PETROLEUM COMPANY ~ z/7(& Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H.H. Hamilton Gentlemen: Attàched are Sundry Notices to a.bâridon'"the following wells located inside the Unit boundaries of the Prudhoe Bay Unit. Mobil-Phillips Kuparuk State #1 Kuparuk State 24-11-12 Kuparuk State 7-11-12 Kuparuk State 33-11-12 Hurl State 5-10-13 w. Kuparuk State 3-11-11 Also included is our Sundry Notice to complete Kuparuk State 22-11-12 for use as a pressure observation well. Yours very truly, SOHIO ALASKA PETROLEUM CO. P. R. Judd District Drilling Engineer PRJ: ja Enclosures cc: Well Files A. M. Skov, S.F. i) ;... - hLCfIVr:D . i.." L - f¡' ':).~ 4'''''~ . r c} 1. t\Jet..! A"~('.!h'" "'''';¡tí.~~ U¡'¡ () t , (J[ [¡,;;g I" P¥, Anch(Jr.!:I~:.,J C (if III /J/,,!L¡¡( WI¡f'lo' ,. JI/ Form 10-403 P.F-V. 1'-10-73 . , ..... v .:. i . ~ U Submit'" ntentlon," In Triplicate r 8 ~T I;~ O~'A~~;U Ò'sï!ô°u.n. R.ports" In Oupllea" OIL AND GAS CONSERVATION COMMITTEE Cr=NT C'" ,.... . " r"- r ~ ~ - . - "''""'1'= SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proponls to drill or to deepen Use "APPLICATION FOR PERMIT..J' for such propowls.) OIL 0 GAS 0 WELL WELL OTHER 2. NAME OF OPERATOR 1. ADL 28241 7. IF INDIAN, ALLOTTEE OR TRIBE NAME Wildcat Sohio Alaska Petroleum 3. ADDRESS OF OPERATOR Pouch 6-612, Anchora e, Alaska 99502 4. LOCATION OF WELL 8. UNIT, FARM OR L A Prudhoe Bay Unit 9. WELL NO. At su rface W. Kuparuk State 3-11-11 10. FIELD AND POOL, OR WILDCAT Wildcat 1521' FEL, 2176' FSL, Sec. 3, TllN, RllE 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) 13. ELEVATIONS (ShOW whether OF, RT, GR, etc.) See. 3, TIlN, RIlE, UPM 12. PERMIT NO. 14. KB = 69.56' 69-25 Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: TEST WATER SH UT"()FF ~ PULL OR ALTER CASING ~ FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON. X REPAIR WEL.L. CHANGE PLANS (Other) SUBSEQUENT REPORT OF: WATERSHUT..()FF § FRACTURE TREATMENT SHOOTING OR ACIDIZING (Other) REPAIRING WELL ALTERING CASING ~ ABANDONMENT. (NOTE: Reøort results of multiple completion on Well Completion or Recompletlon Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly stat. all pertinent details, and give pertinent date" Including estJmilted date of st.rtlng any proposed work. . This well was left completed in January, 1970 as a dual completion as follows: 30n casing cemented at 30'; 20" casing ~ted at 305'; 13 3/8" casing cemented at 2411'; 9 5/8n casing cemented at 9694'; 3 1/2" tubing set with production packers at 8945',8833', and 6535'; perforations open 8880'-8900',8914'-8924',8960'-8982', and 6570' -6604'. ' In March, 1971 the well was killed with 10.6 ppg. CaC12;, and in September, 1979 wireline entry found fill at 8920' BF . Since this well has no potential eoonœrl.c or practical benefì t to the Prudhoe Bay Unit, we propose to abandon the væl1 approximately February 15, 1980 in the fo11CMing manner: 1. 2. 3. 4. 5. 6. 7. 8. Perforate tubing at 8900' +.. Squeeze canent with 100 sV..s Class G and displace to 7000'. Perforate tubing at 6560':!: .., " -1/... Squeeze c::erœnt with 150 sks Class G arrl displace to 3500'. ~v'\~ , Perforate tubing at 2500'+. . . ....:. Circulate in 100 sks penna.frost cement and displace to 1500'. Perforate tubing at 50' + and cerrent to surface. Install narker post. - #p~ -r / ,. '~(' /'. ~ . .- " . .:~""j '. ().F ~~.~. ,.:''oj '\,;q ? ,( (, -f~c. 0' " i7"i': ''". Ç'oø . 1..(, Ir¡: 0/~ ,\ 5'¡, , 0,., SIGNED l E District Drilling Engineer T TL DATE /Äf'jj'( (This space for Stat. office us.) , /' f . - / !f!, APPROVED BY ,1,'-.-. ~... ' ,,:-t~~1! CONDITIONS OF APPROVAL.. IF ANY: TITLE DATE c 'C 1~( l\'~ ~ ? ~ ~ :-' ' . - . -' 2 - I ~J - .~' ( ~tate tc:' witness setting of cerrent plugs, ~ll marker and location clean-up with final J.nSpection of location when. clFar nf. SIlC'W ;;r'Irì ice... :seemstru'f'tíons un rnweT'Slr~lde _1_~ ~~ L~- ~ Ñ_"~'~~ II";' , - , ' , '¡ £0' e b ru a r y 3, 19 7 1 ^ WELL SKETCH - WEST KUPARUK (J.~-ll) 30" Csg. @3l' 1 54fJ 20" Csg. @30S' 7 j ts 9,4# 11-40 ST&C Tbg. insulation @700' 9-5/8" Csg. Dry to 1270' DV collar @134l' 13-3/8" csg. @24l1' 23 jts 61# J-55 ST&C 46 j ts 54. Sf.: J-55 ST&C Cmt top apprOK 6550' CBL Perfs @6570' ..- 6604"-) Perfs @ 6574'-6585') Perfs @ 6730'-6735') squeezed DV collar @6986' . Cmt. top est. 8500' CBL .. ,1, ~ .,'-. :'. . ~ :~ ~i ~ .' . .. Perfs. @ 8712' & 8740-41 (no breaK:'. , down) ;.'1- per. fS.@8770'-8805&87.80'-8794\:l';. squeezed ~ ~ Prod.. packer @8833' (Otis WB perm). Perfs @8860-~1' squeezed ' Perfs @8914'-24' & 8880'-8900' Prod. packer @8945' (Otis VB perm) J Perfs @8948'-49' squeezed ~ Perfs @8960' -70' & 8970' -82' Perfs @8988t-90' & 8993'-95' Perfs @901S' squeezed Bridge plug @90l7' . Perfs @9020' & 9030' ãqueezed Cmt. plug 9547'-9850' 9-S/8'csg @9694' 69 jts47# 5-95 LT&C 6952'-9694' 170 jts 43.5# 5-95 LT&C surface- 6952' 8-1/2" TD @11532' , ::: 1 " , ¡.. .~: . IL. Tubing Assembly 1 \' r;: KB 12.90 L,L;::'f Cameron Tb~ hang~r 1.00 :: .;,,' ~Jt. 3-1/2 Eue lnsu~O '0 . ' 1 3 Pup jts3-l/2" in suI. tbg. 14.50 ill }. j . ;~,f 15 jts 3-1/2" insul.tbg. 461.28 519.68 ~§ .~ 3-1/2"0tis ball val nipple 4.20 523.88 .::' 'r 6 jts 3-1/2" insul. tbg. 180.14 704.02 ;:T ~ "'o:þ. J; , ~~J 1 . t.' '" 192 jts 3-1/2" eue tbg. 5814.27 ,~~ Otis overshot seal DIVID. 9.~0 6527.49 . ~~. ~ "'~.Þ Otis '3-1/2" X-O sleeve 3.50 6530.99 . ,.; "~ Otis 9-5/8" perma-lock pkr 6.00 6536.99 , ':,!,--: Otis 3-1/2" x-o sleeve 3.50 6540.49 74jts 3-1/2" tbg. ~, .~ !~:~U:~~¡:;r~~I,~~;::ebOX ".~. .;~. Otis sea 1 uni t 5" ; '3-1/2" Eu pin x 4" box 3 jts 3-1/2" f:u tbg. 3-1/2" Otis x-o sleeve 3-1/2" Eu pup jt. "~, Oti~ 3-1/2" "Q" nipp Ie i~~ 3~ 1/2" EU box x4" EU pin ~':~ Otis seal un! t 3.25 2248.85 8789.34 3.50 8792.84 31.00 8823.84 .80 1.20 8825.84 10.54 8836.38 .82 88.80 8926.00 , 3.20 8929.20 10.20 8939.40 1.30 8940.70 .80 .16.40 8957.90 Note: Fish in 9-5/8" csg. Consists of: . Otis "WB" pkr. Gauge Ring Junk Basket @ 8977' '..¿. ;' :. ',' Dry area ~:'~ Cemen t ~ Salt water .... 'l~ Fresh water mud' '1,', Diesel -}j ~ .' Crude Oil A ~.;;:: Insula t ion 1 . ' .. . t ... . . .~ .-, WEST KUPAmJK S'm'm (03-11-11) 9/6/79 - Rig up Otis and RIB with 1 1/2" star drill. Tools stopped at 524 ft. Ran iItpression block and confiJ:ned locking mandrel on AD safety valve. Pulled AD safety valve fluid level was at 150 ft. Ran in hole and pulled XX plug £ran 6531 ft., fluid level dropped to 600 ft. Ran to T.D. with 1 1/2" star drill - worked through bridge at 8582 ft. and tools stopped at 8920 BF. Fluid level r10Ñ at surface - reran AD safety valve and set in nipple at 524 ft. Tubing clear to 8920 BF. No method of checking annulus for collapse. WHCIP 0, psi, inner annulus 0 psi. f'.\ -... ., ------"""""""" "......."'._~-. -.- . ---WEST KUPARùK.~ŠTÃTË'3-1i:-ii- - __""A'~_.-'-'--'''''''' ~d .. ,.. , . . 1 -------.....- . . - ". .... - - -- --.... .-....... ... ........ ... .... .-... "... _... .... .'- -í ;,J-$o -'7/ ,WEST KUPARUK STATE- 3-11-11 AFE '110711 Gross - $17,500.- Kill well wlCal . ChI water and install tubing plug. ~asing: 20" @305'; l~ 3/8" @24l1'; 9 5/8" @9694' . TD 11,532', PB 9547'. , . . Cleared road to well site - cleared road to North Kuparuk. Checked Cal ChI water weight 10.~ - will raise to .10.6/1/gal. and add caustic soda. Howco truck going. in ~his morning. . '. ..- -. --..- .. . . ....... - -.-.-. ..... ". . . "'''' --- -..... - .---'"'- -- .... .--.--.-.-. _.. .., .. --.-. '''' . . ... .- -.-.... .... .. . - .... . . 8 II . . .. . ... WESTKUPARUKSTATE 3-11-11. '--j.,~/.11 Casing: 20" @305'; 133/8" @2411'; 9 518" @9694'. TD 11,532' PB 9547'. Opened ball valve w/hand pump (max. pressure 40\10 psig.) PI 60 bb1s'. 10.6H/gal.,cal chI.' water mixed'w/150D caustic soda and 55 gals. A~10l corrosion inhibitor, followed by 18 bbls. diesel. Rate - 0.5 to 1.1 BPM. IP 2300 psig @0.5 BPM. Pressure after displacing cal chI. water 1900 pSig @1.l BPM. Displaced diesel @800 psig. Job con~lete @4 PM 3/30/71. . I' L i: ii ) -- '.WEST KUPARUK STATE 3-11-11 . Casing:' 20u @305'j 13 3/8" @241l';.9'S/8" @9694'.. TD 11,532' PB 9547'. ;- , :"11 ¡'¡.I ' . . ! ~ ' Will Ìnove-in Otis after finishing work @Uurl~ I , . ----- ~ ' -----. --. ...- _. . -, .. .... .... -'.' .. ......--...- . . WEST KUPARUK STATE 3-11-11 Casing: 20"@30S'; 13 3/8" @24ll'; 9' 518" @9694'. TD li,532~ PB 9547'. II)/\f Rigged up Otis wireline unit. Pulled ball valve from 520'. Ran "X" plug ~~ set in X-O sleeve @6531'., Re~ran ball valve to 520'. Attempted to open -_...-:.__,_--__b.all_va1ve -. Hydro' 1in~ would n~t pressure up. Pulled ball valve and ::'" '" . . redressed packing. Re-ran ball valve to' 520' - lIydro line would not' '..;'.," pressure up. Left ball valve in closed position - fluid level in tubing , 100' from surface. TP' - 0 - Job complete 8 PM 4-1-71. FINAL REPORT _.- ---------- ----...-..--..---. -. . ... 11 I"t¡- 30" 31 ft. 20" 305 ft. 13 3/8" 2411 ft. 9 5/8" 9694 8 1/2" T.D. 11532 ~, WEST KUPARUK (03-11-: . 0 - . i l SSSV Nipple 524 3 1/2" production Tubing ~ Sleeve 6530 9 5/8" penna-lock 6536 ~ Sleeve 6540 ., . ~ Sleeve 8792 9 5/8" WB packer 8833 xc Sleeve 8929 Q Nipple 8941 9 5/8" tom packer 8945 Bridge plug 9017 f Form 10-403 REV. 1-10--73 .. . }.... '1fiJI, . ( ~ Submit "Intentions" In Triplicate . "Subsequent Reports" In Duplicate " / ""'\ STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE 5. API NUMERICAL CODE 5 - 6. LEASE DESIGNATION AND SERIAL NO. SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT-" for such proposals.) 1. OIL D GAS D WELL WELL. OTHER WILDCAT At surface 8. UNIT, FARM OR L Prudhoe Bay Unit 9. WELL NO. W. KUparuk State 3-11-11 10. FIELD AND POOL, OR WILDCAT Wildcat 2. NAME OF OPERATOR Bohio Alaska Petroleum Canpany 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage, AK 99502 4. LOCATION OF WELL 1521' WEL, 2176' NSL, Sec. 3, T1lN, RllE 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KB = 69.56' Sec. 3, TllN, RllE, UPM 12. PERMIT NO. 69-25 14. Check Appropriate Box To Indicate NaUue of Notice, Report, or Other Data SUBSEQUENT REPORT OF: WATER SHUT-QFF § REPAIRING WELL ~ FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT. (Other) (NOTE: Report results of multiple completion on Well ComPletion or Recompletlon Report and Log form.) 15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS. (Clearly state all pertinent details, and give pertinent dates, Including estimated date of starting any proposed work. NOTICE OF INTENTION TO: TEST WATER SHUT-OFF ~ FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING ~ MULTIPLE CQMPLETE ABANDON. CHANGE PLANS March, 1980 Pulled' SSSV. Perforated tubing with 4 shots per foot fran 8904 to 8908. Established injection rate with CaC12 brine and squeezed 100 sks Class G cement with 1% friction reducer. Displaced cement to 7027'. Perforated T.BG with 4 shots per foot fran 6559' to 6563'. Established injection rate with CaCl and squeezed 150 sks Class G cement with 1% friction reducer. Displaced cement to 35~9'. Perforated with 10 shots at 2490'. Established injection rate and pumped 100 sks Pennafrost cement. Displaced to 1500'. Perforated tubing at 50' with 10 holes. Pumped 29 sks Permafrost canent and circulated cement to surface. Nippled down Xmas tree, installed marker post and welded all openings shut. The following info:rmation bead-welded on marker post: SOHIO) F' t? (J 3-11-11 1521' WEL,. 2176' NSL, Sec. 3, TllN, RllE IDeation cleaned. 16. I hereby certify that the foregoing Is true and correct SIGNED ~ A-.1 f\ M RRm TITLE ACTING DISTRICT DRILLING ENG~ DATE ,3/"//86 (This space for State office use) APPROVED BV CONDITIONS OF APPROVAL., IF ANY: TlTL.E DATE 3""~/- 8° GK :mlh See Instructions On Reverse Side ." Alaska Oil and Gas Conservation commission Hoyle H. Hamilto < Chaiman of the ß... tô8~ Lonnie c. Smith j'-~ commissioner ~ March 10, 1980 Ben LeNoman Petroleum Inspector Plug for abandonm:?:of Sohio's '/ \ w. Kuparuk State 3/11/1XMö4øìU Sec. 3, TI1N, RIlE, UPM MOnday, March 3 - I departed my home at 12:30 P.M. for a 1:00 P.M. showup and 2:00 P.M. departure via tlien FIt. *9 for Deadhorse arriving at 3:35 P.M. I proceeded to Nabors Rig i22-E where I met with Mike Whitehead, Sohio Drilling Foreman in charge of the plugging operation. Tuesday, March 4 - At 12:30 A.M. we proceeded to this off-the-road location via Sno-Cat where Dowell cementers were preparing to squeese perforations. Tubing (3" ID) had been perforated earlier from 8904 '-8908 ' . Injection rate was established at 4 BPM at 800 PSI. Twenty barrels class "G- cement were pumped followed by five barrels wa:rmfresh water and 56 barrels caCl2 to displace cement to :t 7000'... woe for eiqht hours. Top of cement was ta,<¡ed at 7027 ' with Schlumberger gun at 8:30 P.M. and tubing was perforated from 6559' - 6563'. Injection rate was established at 3 BPH at 1600 PSI. Wednesday, March 5 - Thirty barrels class "G" cement were pumped followed by five barrels warm fresh water and 25 barrels CA CL2 to displace cement to :1: 3500'. woe for ei<¡ht hours. Top of cement was tagged at 3549' with Schlumberger gun and tubing perforated from 2494' - 2496'. At 11:00 A.M. 20 barrels Arcticset cement was circula tad in and displaced with 13 barrels caC12. No woe and pluq was not t.ag-gad. At 12:15 P.M. tubing was perforated 50' below ground level and Arctic cement pumped down the tubing until <¡ood returns were obtained through the annulas valve. During the afternoon Christmas Tree was nippled down and marker post installed with all pertinent data bead welded on. This inspection was made at 7:30 P.M. Attached find copies of Sohie' s plug and abandonment program, pressure /.,/.recorder charts during squeeze operations, and pictures of the operation. .1 / ~ursday,March 6 - I departed Deadhorse via Sohio charter at 1:15 P.M. . arriving in Anchorage at 2.45 P.M. and at my home at 3:15 P.M. In S.UInma. ~, I Wi. tnes!:!~ plugging for abandonment by Sohio of Kuparuk State JIPe""* 3-11-11 {old Mclr1il t.uet~. \ \. /.";/ > -:'-'" ...~ ~ \i ~ ~' " ~um 10-403 RE..,'. 1-1<>--73 r\ Submit "Intentions" In Triplicate . "SubSequent Reports" In Duplicate .-"""'" STATE OF ALASKA 5. API NUMER ICAL CODE OIL AND GAS CONSERVATION COMMITTEE 50-029-20014 6. LEASE DESIGNATION ANO SERIAL NO. SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this ~orm for proposals to drill or to deepen ADL 28241 Use "APPLICATION FOR PERMIT-" for such proposals.) 1. OIL D GAS D - 7. IF INDIAN, ALLOTTEE OR TRIBE NAME WELL WELL OTHER wildcat 2. NAME OF OPERATOR 8. UNIT, FARM OR LEASE NAME Sohio Alaska Petroleum C Prudhoe Bay Unit 3. ADDRESS OF OPERATOR 9. WELL NO. Pouch 6-612, Anchorage, Alaska 99502 , w. Kuparuk State 3-11-11 4. LOCATION OF WELL 10. FIELD AND POOL, OR WILDCAT At surface wildcat 1521' FEL, 2176' FSL, Sec. 3, TllN, RllE 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 3, TllN, RllE, UPM 13. ELEVATIONS (Show whether DF, RT, GR, ete.) 12. PERMIT NO. KB = 69.56' 69-25 14. Check( Appropnate Box To Indicate Nlture of Notice, Report, or Other Data NOTICE OF INTENTION TO: T, EST WATER,SHUT-OFF § PULL OR ALTER CASING ~ FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* X REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT OF: WATERSHUT~FF § FRACTURE TREATMENT SHOOTING OR ACIDIZING (Other) REPAIRING WELL ~ ALTERING CASING ABANDONMENT* (NOTEI Report results of multiple completion on Well Completion or Recompletlon Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS, (Clearly state all pertinent details, and give pertinent dates, Including estimated date of starting any proposed work. This well was left completed in January, 1970 as a dual completion as fol1CMs: 30" casing cemented at 30'; 20" casing cemented at 3Q5'; 13 3/8" casing cemented at 2!11'; 9 5/8" casing 'cemented at 9~4'; 3 1/2" tubing set with production packers at ~245', 8833', and 6515'; perforations open 8880'-8900',8914'-8924',8960'-8982', and 6570'-6604'. . In ~ch, 1971 the well was killed with 10.6 ppg. CaC12; and in September, 1979 wireline entry found fill at 8920' BF . Since this well has no potential econanic or practical benefit to the Prudhoe Bay Unit, we propose to abandon the well approximately February 15, 1980 in the fol1CMing marmer: 1. Perforate tubing at 8900'+.. ,;) 2. Squeeze cement with 100 sks Class G and displace to 7000'. .l 3. Perforate tubing at 6560' +. 4/" 4. Squeeze cement with 150 sks Class' G and displace to 3500'. ...s:C 0> ,~" 5. Perforate tubing at 2500' +. ,.' 6. Circulate in 100 sks permafrost cement and displace to 1500'. 7 . Perforate tubing at 50 I + and cenent to surface. 8. Install marker post. - ,¡4 bt:t~doVJ ~CA blY¡ cy Îll tPlac. @ . ...,t ..... " ,~ (~I , t h,;" ")¡ ,¡:, !', (7 " .c,' 4',(/1., vI '("j:., ~(~t) ) ? [uC . "(II 'í.)/ '\;5'';; (1) SIGNED District Drilling Engineer TITLE DATE / h-f'II'~ 16. I hereby certify t COIvlMYS 2 -lb--8û APPROVED BV CONDITIONS OF AP OVAL, IF ANY:- State to witness setting of cenent plugs, well marker and location clean-up with final inspection of location when clear of snav and ice. Apþt~ec! óiJJh See Instructions On Reverse Side R...-.a TITLE DATE ..-'J ,- ð,""\ h h 7- I ¿/v ? ,5' ? / I C/O:'j tj/-./,? ;1Z-) 7~/' /}'-,vT)V r tf?7Yr.J-P/Î (. h 0.9-.7- 9¿ S)) .Io/L ?ie / je 1'(1", < ,¿, '2 r (v/:",,/ '. ~ 7' I) Ci/..:J:2/ '( 7 ¿ ~Y;7"'ì/' 'i-(?'Yl/V y:P ¿;0T'yY271 (/0 L ó g - / (),SJ b g) b 7/ l/z / ':J. "~_\'.s ~ ~ ~y5 .L J \ ¿re'),. "J \ ".L ~ . ~/ / I '} v / b Ð r . -)';/ {¡ I :,>ç (. /./ "~,, /? / ¿ I--¡ /. Q ).' v \r~r-¿I (ßwc ,; -) h /.',S' //~ v;lc/ 'frVd . '-:rv2ff-..f~ D y-.-.' he:! ¡ -)?: h,;-{3.çfV~Y(Ý r) '~,-QrNV-g 1."1. n ~ ~ j('f'\ ~ t---1 p . 0) 8 b ~ / es -./ s:/ i!) 'v-I¿~7 :rr~:FV>'-v1/"~ ""S 08 L ~ QI.JS I J -h 7 cO;; f:i.l/:/ /) ~-h _s " ~/~ ç / \D ) f" 3' ('..5 hi) rv'~ t- -v1 :J ({\ 0 .~ h £ ( '" \ Q ~ç.s¡¡o/ . -}1 .' 5 ;;ç.j P'J tIN hb.. oz d)\">O ?[10/t>C7 / ç .;ì ~/,)"r.;7 -n",-) 0 ç j .oC.. f.::...,/ ~ .~' I '- ~ '''~~.., , ¡., ";'a - h IbB .00&(3 - 0-8B8 ^ð 0;- 0(0/) j)CI ' -LSd ~/v~ ~ I) ~, -r (r~7{/), no:! ')- J QL S:7 .. (r"J ~ i l Ç> i ¡ -~.". -~ ~ ~ ~ "~ C)~ ~ 9( It"-- q ~ 17 ,(,'1 i ;/-j('=~-: 7Çiÿ Y'l'pJ!c'fio ./Iv(, - ?J:7"Ub ')..I ~ "- ~ ~ ~ '~ ~ tJ'-.... .... ~~ ~ Ca, 0 e " f ~ ( i f: I ( ~ I f , l f r I ( J i .~ .! -( ',/' I i"t:> !i.l'..'\, "-" ~~ - /1~ 1:1--u~M-d; #- 3-/1'-11 I ~ . U ,-. )41 ~ HO & 30" ~~@3/' r Zo ,. qlf u/-I Gô (4' ,30:; /33/q I, ~ Lf ~ ,/ 'I P: J (ðJ z.. ~ II ' f+ (, 57ð r -G60LJ'(~ f2~ /?~UL @ ~ S""Sð ~ I J í~ P51 , OS! 1 '1/' <¡ 1. 5 ~¡;' 'f7'J S C<t-3~ (â q ('1 'I ' 12///£1 (gc¡¡;Ó f--!Jý70 I) ~ ~~.~. ~ 9¿"'¿ ISF/b (/ ¿";;)b.J~JZ:? <. "'IJPI /¿f~7t7'((,S7ó-6K04') ~J~ ~ (~ ZYYPI::;o/;) 1/¿~c..6/?IZ4;<.It'/ì/ I \~ ';,9'1'13-'1>- j (?~,"'--p~(2, ~:g'9s~ i" f'~ ~Q~1.J¿ . . p~, ¡2kA ~,./. Z9lj Ç-r :;L,t t--:J.,- 0 f ,e¿; 7 Y 7 I ßA~ C¡o¿ó-y--> .~ . . June 26. 1979 Mr. Robert A. Ballog Union 011 Company of California 2323 Knoll Drive. Ventur.. California 93003 Re: Preparation of thin sections and paleontologics11des from public well sample library Dear Bob: Rece1ptis, ~c~p<!WJ.,~dged for the resp'ective. thin .sections, palynological slides.. foram1n;lf~ral.slides and residues prepared from samp lesand cores of the following ~ells in fulfillment of the February 28, 1979 and April 19. 1979 . letters of understanding to you and the April 30, 1979 letter to Dick Stewart: ' ARCO Sag River 11 ARCO Prudhoe Bay St. #1 B.P. Sag Delta #31-10-16 Shell Lake 79 Fed. #1 Sohio J-1 (9-11-13) ARCOPut .River 11 (7-10-14) MobilGW)fdyrBay~. III (8-12-13) Mó'6:J..l",.'W';~~AICijþãt:{ít(;r~4v~~'full3Þll:~.{i,~~~~I[ñ¡~1 Mobil Kadler St. #1 (15-9-16) Exxon Canning River Unit DA-1 (19-4-24) B.P. Niakuk 12 (23-12-15) Two sets of the thin sections and palynological slides were received, 8S per our agreement. It is presumed that inasmuch as no thin sections from the ARCO Put River 11 were received, the approximate 20' of Lisbu~ne carborate penetrated within the 9810' - 9903' interval that you sampled was considered insufficient to ,warrant preparation of a thin section. The slides and thin sections have nòw been placed in the State's public library of specially prepared well materials. A copy of the June I, 1979 inventory of special materials is enclosed for your reference. Please' refer to the June and July issues of the Commission's Bulletin for . additions to this inventory. .. Robert A. Ballog ~ \ ¡ 2 ;~. 26, 1979 Your prompt preparation and return of the materials prior to our agreed 7/1/79 date reflects well on your, Jim Miller's, Bill Reayts, and Dick Stewart's attitude of falrnessto others in the geologic profession and contributes to the mutual beneficial aspects of the slide preparation program. We look forward to the possibility of making additional slide preparation agreements with Union in the future. Sincerjt£( Wil1iaD,1 Van Alen Petroleum Geologist cc: James A. Miller, Union, Bres, CA William G. Reay, Union, Ventura, CA John A. Packard, Union, Anchorage, AI< Richard L. Stewart, Union, Anchorage,AK , ~ ... - -' .1.- '... ". . ,..' " "...--....., ,~ <, April 19, 1979, Mr. Robert A. Bal10g U~!on Oil Company of California 2323' Knoll Drive Vent~ra. California 93003 ~ Re: Acquisition of Drill Cuttings and Core Chips for Preparation of Thin Sections and Paleontologic Slides Dear Bob: In response to our discussions this week, permission 1s hereby granted to Union Oil Company to make small quantity cuts (approximately one cc. maximum- e~c1i)-'-"fromthe State's, setaf samples and cores of the following wells'for the purpose of preparing thin sections, foraminiferal slides. 'palynologic slides and kerogen slides, subject to the conditions set forth belov: Set lio. 334 223 232 322 Well ~l Gwydyr Bay So. #1 (8-12-13) Mobil ~~päfú~ve'r":';'3-11~li~~ l1obi! Kadler S't. 11 (15-9-16) Exxon C ann !ng River Unit IA-l (19-4-24) 10.020 - 12.237' 8,700 - 11,532 9,600 - 15,543 4,300 - 8,874 Cuts are to, be made only from those intervals in which the volume of . cuttings or core material in the State library sample is greater than 10 cc. No cuts are to be extracted if the volume of material in the ,State set 18 less than 10 cc. Union will provide the State with a list of the specific sample and core footages sampled. Union shall assume all coats entailed and will provide the Alaska Oil and Gas Conservation Commission with two complete sets of all thin sections and slides prepared and return all remaining sample and core residues. All thin sections and slides prepared from these cuts are to be received by, the Commission no later than July 1. 1979. We are pleased to work with you in this mutually beneficial endeavor and look forward to your company's continued exercise of care and good judgement in the handling of this well material, as evidenced in the sample processing arrangements you have undertaken with the State in the past. . Very truly yours, V~fLfÁL. William Van Alen Petroleum Geologist .'~STATE "' of ALASKA l~ ... HIFIJIURANBr)(H/ .. TO, r Homer L. 8urrel1 I~ 11 Di rector fAJ THRU: O. K. Gi I breth ~ Chief Petroleum Engineer Lonnie c. Smith ~~ Petroleum Engineer DATE: October 7.0, 1977. FROM: Inspection of Location Clean-ups, Horth Slope Alaska tJ. l¿tt.fõJlw...!( 3-//'// Søptember 12, 1972 4c...1) 7/1~ ¡(//~ ¿J./?1. I departed Anchorage by \':e i n Canso I i dated Y s comr,ìerci a I f I i glt arT ¡vi nçJ at Deadhorse on the North Slope at 9:30 AM. The weather was generally poor VI i th 1 i ght to heavy snovl sho\A¡ers, and 30 degrees with gusty "d i nus. I v!as met at the Ai rport by Red Morst of :"lukluk, \'/ho carr'ied me to the ílukluk camp v/here I picked up the I eased veh i cl e. I returned to the Gay f\ i n",ays, Inc. of'fice at Deadhorse to check \'lith the oper-ations pi lot V!alt Friscl1, and learned that a chopper \llould not be avai lab Ie unti I late afternoon and I "-Ias requested to check back about 5; 00 PH. SUBJEO: I returned to the r:Juk I uk camp where I ate I unch and topped off the tv/a gas tanks in the vehicle before heading out \'lest on the r3P's "spine road" through the field. It is evident that a great deal of construction activity has been going on "lÎth new gr'avel maintenance r~oads being con- structed for fie I d pipe lines 'tlh i cfl VI i II transport oi I and OdS fr'om the we I Iheads at each development pad to the production stations. New culverts are being put in for better drainage of both lakes and rivers. Large stock pi les of pipe and equipment are being located close to ,¡¡here the v/ork will occur in the field area. BP had at least thn~e arSJe stacks of pipe located i n the fie l d bes ides tf)e ma in supp I y depot at Muk I uk's yard. BP has constructi on undenJay on the ~Jrave I pad for their new Base Camp) which wi I I be abou1' one ~i Ie southeast of the GC- production flow station. The Sri nkerhoff Ri 9 ;136 has been moved from F-pad back to J\-'pad over we I J t6 to comrnence resetti n9 of the tub i ng and packer in that \'Ie II. Porti ons of the r'j g and camp are sti II bei n9 moved. I drove to F-pad and took tV,lO pictures (attached, page 5) sho'tJÌng; Photo tl-I, Item fl.1, 1'h(~ \'/811- head and 5 i gn of VIe II ~JF --7. VI i th I tern /!2, the reserve pit in the back~}round. Photo fq -2 shows: I tern t.' I, vie II heads of F-I 1'h rougl1 5; I tern ;'13 portable mast and log9ing truck working on well :~F'-6; and Item ß4, pipe and dri J ling equipment stacked on edge of 1'l1e pad. I ,also stopped at the old BP Central Pad-3 for Photo #1-3 which shows: Item #1, the open pit on the south side of the pad and Item #2, one of the fenced wel I œ liars. I then drove to Prudhoe and proceeded to ARCO' s DS flj It/here I had noticed the dri I ling mast had been lowered on the ?-o~/an rig. The ri 9 had been ski dded off of the ¡; 1-5 \'le II to the very end of the pad and ~ ,/ /~ -. Homer L. Burre II -2-- October 20, 1072 the mast laid doy.¡n. The rig does not appear' to be di:;rnantled for' rnovi ng off th is I ocati on. I took two photos (page 6) of th is deve I opf:l(~nt dri II site. Photo iq-I shO\'/s: Item ¡q J the pennanen-r production bui,ldinq over the vie 11 head on \'/e i t PI; Item P2, the VIe lis i gn on the door' of the bui Iding. Photo /.11--2 vIas taken from the roadvJay easl of the pad and shows: Item # I, the t\\JO vIe II-houses over P I-I and It 1-- 3; I tern /12 the vIe II heads of 111-2, f,t 1-4 and In -5; I tern fl3, the rig stacked at the south end of the pad and; Item ti4, a test tank near \'18 II ill --11. I returned to Gay Helicopter"s office at Deadhorse and waited for the avai I ibi I tty of a hel icopter. Finally at 6:30 pr.'1 a hel icopter 'f/as ready and even though it was quite late in the day f decided to proceed with the inspection trip because no better conditions could be predicted for' the next day. hie I I locations were inspected in the follo\'JÍng order: I. Mobil - Hurl State #5-10-13 (Sec. 5, TION, RI3E, U.M.> We- reached the location at 6:46 PM, circled and landed. I took two photos on the ground (page 7). The first photo #1-1, is looking south past the vIe II head toward the pit and shows: I tern it¡, the we II head in a ce II ar'; Item 1/2, the well sign; Item f/3, rig si I Is and pi I ing; Item /"4, the . reserve mud pit. Photo 1/ I -2 shows: I tern Ill, the we II head; I tern i~~3, the . rig s i I Is and pi I i n9; I tern 1!5, the I! rat ho Ie n pipe next to the we II head. The gravel was quite i!roughn and the location although free of any large materials would require considerable picking up to be clean of trash and debri s. 2. Mobi 1- Kuparuk State #24-11-12 (Sec. 24, TIIN, RI2E, U.N.) This well has a large stack of mud pal lets on the east end of the pad and several other stacks of material near the wellhead and along the west edge of the pad. The wellhead has a few 5i I Is around it sticking up th rough the grave I. Some boards and trash are scatt-ered just of f . the northwest corner of the pad. A dri I ling line is strung across the pad along with boards and sticks, and lots of small debris. I took three photos (page 8) here, j!2.. is looki ng to the southeast and shows: f tern If I, the we II head in a ce II ar; I tero /f2 part of the open reserve pit; Item 1/3, a mud tank, a stack of barrels and a pi Ie of rig si 115. Photo ~[2-2 is a view to the southwest shovJÎ ng: Item )/4, three stacks of casing along the \'Jest edge of the pad; Item t5, an open 1'catnp pit:'. Photo {I 2- 3 is a view to the northeast across the north\'J.es t corner of the pad sho\'Jing: Item t~4, stacked casing; Item I.l6, a IOÐding dock with miscellaneous supplies; Item #7, the gravel road leaving the location to 'the north; Item i~8, boards, trash and cable both on and off the pad. 3. t.1obi I I\~orth f<uparuk st. t~26-12-r2 (Sec. 26, TI21L-HI2E, U.f',1.) There is a gravel air strip here. There is no material left on this location, holtJever, there are a lot of boards and debris scattered around on the pad and on the edges of it. At least two pits arÐ sti I I open, one to the east and one to the south. I didn't see any well sign. I took three photos (page 9) here, P3-1 looking to the south shows: Item ¡,q, the \'Je II head i nthe ce liar; Item fß2 what appears to be the reserve mud pit. Photo #3-2 shows: I tern /,1 I, the we II head; Item f.! 3 , boards and (~ c (~ Homer- L. Bu rre r I ~. 3- OCTober 19, 1972 trash al lover, around and off the pad. Photo F3-3 is a view southwest across the pad show i n9; I tern Il4, a trash pi Ie V/h Ich is about 35' f rom the north edge of the pad. 4. ¡.!obi I - \'lest Kuparuk k3-J I-II (Sec. f::3 TII¡LJ RI IE UJ,L)- There are no supp les eft at this location, bu I IS obvIous from the damaged tundra around and off the northwest corner of this location that proper care was not taken reguard i n9 veh i c ie open:fti on before or after breakup. Ther'e are quite a fevJ posts or pi ling sticking "up as much as th ree feet \.¡h i ch are off o.f the pad on the southeast cor'ner. The reserve mud pit is to the south of the pad and it contained some wi r'e rope on the \'/est 5 i de of the pit berm and êI number of mud sacks in the pit along the east side. There is a large well sign at the east end of well location. I took n.¡o photos at this location (page 10). Photo fl4-1 shows: I tern it!, the \ve II head; I tern P2, the reserve pit; Item /13, a wellslgn; Item #4, pi I ing and sllls used to support the rig; Item /l5, a caved-in ¡¡rat holel!. Photo I,l4-2 sho\~s: Item in, the we II head; l-rem ¡:~2, the rese rYe mud pit; Item l!61 hoses, pipe and debris which are scattered around the location. 5. SOCAL - Kaverak Pt. #32-25 (Sec. 25, TI3i'J, RIOE, U.r",1.) Due to the lateness of the day and the heavy snow showers we required almost 10 minutes to locate this \'/ell. \'!hen we found it at 7:49 PíV¡ it was too dark to take any more photos but I observed the fol lowing: I. The wellhead is contained by a plywood house which rests on the rig si lIs and pi ling; 2. There are several joints of pipe on the sl lis near the bu i I ding; 3. The reserve mud pit 1 s to the east side of the location; 4. A small we I I-test burn pit is to the southwest of the location; 5. A number of barrels are also stacked on the si lis; 6. The pad is fairly clean except for the heavy pieces of Iron sticking out around the edge of the pit area; 7. Consider db Ie junk and debris has been p I aced in the sma II burn pi t. 6. SQC/\L - Simpson Lagoon ¡132--14A (Sec. 14.t. T 13;'1, R9E J U .¡vj. ) Vie found this vJel1 location I ightly covered vJith snovl ëJnd it was sti II sno\'JÎng. It vias too dark for pictures so I ~'/alked around the location and noted the foil 0\'-1 i ng: I. The reserve mud pit was sti II open on the VJ8St s fde of the we 11; 2. The VJEd I head vIas covered by a pi yvlood house; 3. The rig pi ling and si I Is were sti I I in place; 4. The fuel area berms were sti II intact; 5. The reserve pit and around the pi lings contained trash and debris; 6. Part of the gravel on the east side of the well was smooth; 7. On the si I Is near the we I I house a great deal of material had been neatly stacked consisting of barrels, tubing and ti mbers. The nearby snoVJ showe rs cant i nued and we ~"ere u nab I e to locate the SOCl\L vJel1 J/33-'29E and after' huntin£~ for a \.¡hile I decided enough ti me had been spent and so vIe headed to\¡Jard Deadhorse. 7. ¡':lobil - I<uparuk St. t!7-II-J2 (Sec. f}7~ TIn), RI2E, UJ.L'- As vIe flew i'O'/Jard Deadhorse \'/e flevl directly over this ¡.:1obi I well and I~nded. even though the aircraft's landing lights had to be used. Th is I,ocati on has: I. A reserve mud pit south of the \-/8 I f V/h i ch Haner L. Bu rre I I e-... ¡ j -4- ( ~.. October 17, 1972 contains some debris; 2. l\ test pit off to the southeast \-Jhieh is sti 1 I open with a large pi Ie of gravel or excavated material pi led to the southside; 3. The wet 'head has a wel Isign; 4. Rig si I Is are sti I t i np I ace in the grave I arou nd the \rle I i head; 7. Except for a I ad de r I êJ'l i ng near the wellhead the location appeared cleaner than most of Mobi Is locations. VJe returned to Oeadhorse arr' ¡vi n9 at 8: 30 Pr,1 after inspect i ng seven of eleven locations of two operators. AtTachments f .I for your convenience when ordering copies, indicate the number 01 copies desired ¡!'rIhe ' box lor the select, P558A.l 5110 AN for your convenience when ordering indicate Ihe copies desired In the box for the you select. P558A.l 5/70 4-1 4-2 ,r~ ...-- Mobil Oil Corporation POST OFFICE POUCH 1-003 ANCHORAGE, ALASKA 99501 ALASKA DIVISIOft Pouch 7-003 Anchorage, Alaska State of Alaska Department of Natural Resources Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99509 ATTENTION: Homer Burrell DATA TRANSMITTAL: RE: DIVISION OF LANDS NOTICE DATED DECEMBER 17, 1971 The following material is being transmitted herewith. Please acknowledge receipt by signing one copy of this letter and returning it to the undersigned. - Mobil et al. West Kuparuk 3-11-11 Core Analyses Cores 9-12 8809/8832, 8884/8917, 8969/9022 Tight Hole Test #3 Tight Hole Test #4 Tight Hole Test #5 8979/9001 8987/9022 8780/8794 Production Test #1 perfs 8960/8970 Production Test #2 perfs 8880/8900 8914/8924 Production Test #3 perfs 8880/8900 8914/8924 Production Test #4 perfs 8880/8900 8914/8924 Production Test #5 perfs 8770/8805 Oil-Water permeability & Waterflood data PVT Analysis dated 3/5/70. TRANSMIT~~ *************************************************************************** RECEIVED BY: DATE ~ü'~~ s // ;2,//2- )~ ....-- ."". t ' ~ \ C), ~'frm -P~7 .) SUbMIT IN --~É OF ALASKA' ,.' ¡ OIL AND GAS CONSERVATION COMMITTEE ~ '" \.-."/ a' . ~Jþ-dtoff'\"n revers'l""sJtt;) "5, ,. Ii N 50-029-20014 j WELL COMPLETION OR RECOMPLETION REP:¡ÞR¡T AND LOG III ';<.~rt,~ '->."". ._" ....-' <.."",.~<.,' ..;. '-~'-'1!:~'iW"'.,..""._A--',,- ,~"~",,,,~-,,,=-,,~,,,,,,-,,<",---'~'';'l--'"'C''>'O;''';'-':_'''''''''''''''''''-''-'-''''--'''~C. ..-,'.. ,,*,,'~., . ',.""".._~~<.1'_"'~~';:':-;.~J':--''''~-.~ ~ .' la. TYP OlI. r:;;¡ GAS 0 0 OtJèJ..i i WELL ~ WELL DRY ... '. íb. TYPE OF COMPLETION: : NEW ¡;;:-, wonK 0 DEEP- 0 PLUG D DIFF. D WELL ~ OYER EN DACK - ltESVR. . NAME OF OPERATOR 6. LEASE DESIGNATION AND SERIAL NO. ADL 28241 ~,""~'.'<"."'''''''''''''' ...- 7. IF INDIAN, ALLOTrEE OR TRIBE NAME 8. UNIT,FARM OR LEASE NAME Mobi17Phi11ips, W.Kuparuk St. ; ,.J1QÞ1.t ..Q.il,..C,Q.r.p~QXat.i.an, _--'~'H".~-"W.~."'-"''',",'''' . ß. ADDRESS OF OPERATOR ¡ Pouch 7-003, Anchorage, Alaska 99501 ~. LOCATION OF WELL (Report location clearly and in accordance with anJl 8~tite requirem~nt8). : Atøurface1521' FELand 2176' FSLSec. 3, T1lN,RllE' 10. FIELD A¡ND POOL; OR W;rLDCAT Wíld~at At top prod. interval reported below Same Same Sec. 3, TlIN, 'RI1E At total depth 13'. DATE SPUDDED ~1IE. 53.72 Top Gravel Pad sad1erdch~'l . ~ 24.!TYPE ELECTRIC AND OTHER LoGs lIES BHC Sonic, FDq, S~P, CDM SNS, Seismic check¡shç~s ~. . ~ ; CASING RECORD (Report all strings set in w~U) . CASING SIZE WEIGHT~ LBltt. GRADE DEPTH SET. (MD) HO~ SItE 30 154 Q 94 ~ 5 ~5" 6:k 43 .!5&4rA . IF MULTEPLE COM!PL., 21. INTEáVA'LS Dan.LED BY HOW MAl'!;Y. . 1:: ROTARY TOOLS , . - _'Dua ¡ Surface~ - T.D BOTTOM, NAMÉ (~A.NJj tTVD)* ,ç, j:,;í Kupar'6k River 6570-6&04 Cretaceous < C,:ASLE TOOLS 23. WAS DIRECTIONAL - SURVEY MAD~ Deviation surv~y A:MOUNT PUI..t<ED 13 3 8 9 5/8 28,¡ PERFORATIONS OP'E'N TO PR .' u:cn ~ ~'.>:?:~ ¡ ::::~::O4~ ~l;~!~~~~)tions (Interval, size and number) 2!). ~. DATE FIRST PRODUCTION DATIC OF TEST. FLOW TUBING . PRESS. CASING tJiIIi DATE éf Space. for Additicinal Data on Reverse Side) INSTRUCTIONS,) ,rr,\ \ . General: This form is designed: for submitting a complete and; cQuect wen completion report and log on. all types of lands and leases ¡nAlaska, . . , Item: 16: Indicate whicheleva.t"ion is used as reference (wher:e not otherwise shown) for depth measure~ ments given in ether spaces on . this form and in a('\y attachme~ts, t, 'I'I I 11" . .. ; I I Items 20, a"d22:: If this well ,is completed fpr separate production from more than :èJne interval zone:, (multiple completion), so state inite~n 20, ~nd in item 22 show the:prcducing interval, or' inte:r~als, 'top(s),b9ttorn(s) and 'l~ame(s) (if any)' for only the interval reported. ini.tem 30. Submit a sepai)ate r:eport,' (page) on t~is ;form, :~dequately, !de~tified, för each additio'nal intelyal to beseperatelY, produè~, show-' ing ,the additional d~~ta perfin~pf t.osuch .inrerval. ", ' . Item26: "Sa,ç:ks Cemeht": Attached sJ~þlê~nef)tal records for t~is).well should show the details of any mul- tiple stage/:')cemeriting:; and the 10cation:>~'6,f,the' cementing tool.: ' ') '1 . ,"') ,1 ~ Item 28: S4bm'lt a separatecpmpletion ,.report on this form fbr :each: interval to be separately produced: (See instruction for items 29 and. 22 ab~~e). 34. SU~MARY OF FORMATION TESTS INFLUDING INTERYAL,TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS, ! .¡ 35:' GEOLOGIC MARKERS rr, , " , WATER AND .1¥IUP ) NAME UE VERT. DEP'1"1{ ,( I. .~J 'j: '"'I i ~\ ;'\ I Refer to attq.ched data . ) i'l I, I ~) )' 36:CÖRE DATA. ATTACH BRIEF DESCRIPITIONS' OF,. LITHOLOGY. POROSITY. FRACTURES, A.PPARENT DIPS AND DETEC"1."ED snows OF OIL. GAS OR WATER. . , Mobil Oil Corporation 'f'.t\ ~\l-rt rr , ~. r' ~ ~ T' 1'-""11 : n ¡~ ¡J\~ ~;:C7~ Ij r, \1.) [\.7:1 !;':\\'1 ~\ B ,,\ f\ \'" L I;:. I ..' [I \.1 .I..' " ;;:: I h .1 ".' ,~, ;¡ ~ '~.;~;I ~ \1 U U ,.\:.':~.' (':'.'J ti \d ill D ¡:rJ."'1~ r!~."» History of Oil or Gas Well (Subsequent) Operator: Mobil Oil Corporation Well No.: Westo Kuparuk State if 3-11-11 Field: Wildcat - North Slope Sec. 3 T11N R11E, VoMo DATE 1969 10/19 10/21 10/25 - 26 10/27 - 28 10/29 - 30 10/30 - 31 Subsequent History of Well Completion This well was completed using Peter Bowden Rig ifÞ31. Activated drilling rigo Picked up drill pipe and cleaned out to 1520. Drilled out to 95470 Ran bit and scrapero Ran GR-CBL. Squeeze cemented Interval 6574/6585 Set bridge plug at 6623' 0 Set retainer at 6250' 0 Broke down formation with 3100 psio Injection rate 3 bbls/min. at 1700 psi. Pumped 100 sacks class "G" cement. Final squeeze pressure 5000 psi. Drilled out cement and pressure tested casing to 3100 psi. Broke down formationo Injection rate 2 bbls/min. at 2200 psio Resqueezed Interval 6574/6585 Set retainer at 6250'. Broke down formation with 2200 psio Injection rate 2 bbls/min. at 2200 psi. Pumped 100 sacks. Final squeeze pressure 5000 psi. Drilled out to 6600' 0 Pressure tested perforation to 4000 psio Did not hold pressureo Injection rate l~ bbls/mino at 3100 psio Resqueezed Interval 6574/6585 Set retainer at 6400'. Broke down at 4500 psi. Injection rate 1 bbl/min. at 4800 psi. Squeezed 35 sacks into formation, staging last 3 bbls at 1 bbl/hr. Final squeeze pressure 5000 psi. Drilled out cement 0 Pressure tested perforationso Broke down at 4000 psi. Injection rate 1 bb1/min. at 4600 psio Resqueezed Interval 6574/6585 Set retainer at 6240. Pumped 100 sacks of cement. Pumping rate l~ bbls/mino at 3000 psio Final squeeze pressure 5000 psi. Pressure tested perforations. Broke.down at 3000 psi. 10/31 - 11/1 Resqueezed Interval 6574/6585 Set retainer at 6230' 0 Broke down at 4000 psio Squeezed with 100 sackso Drilled out and pressure tested to 4500 psio Drilled out bridge plug and cleaned out to 9543' . 11/2 - 3 11/4 - 5 11/6 - 7 11/7 - 8 11/8 - 10 11/11 - 13 11/14 - 15 , :1 .(t"<!~ n,' ,"" t\-N I]~' f)'" " ~ ~~T' 'A' 11 ',' 'Ij l' '~j " ,,:, \ I "';¡ ,,¡ I, :: ',',',J:I :;:' " ~, ~,J:.1 ~~ \-,:" ;,~ n j':J 1-~1 I) .:l ~. h~ '~.~\ ,t (. , ,', '<\ .~ Il:j "< ì' '! .',} h A:"" :.:1 " '3 ,:'",::1; .,' ",",.ö/ \,," !i.,J I. ,', ,-'-; 'i',':J d ~ i:~ :.nI Squeeze cemented Interval 8780/8794 Broke down perforations 8780/8794 at 3200 psio Squeezed with 150 sacks. Drilled out and pressure testedo Perforations broke down at 2200 psi. Resqueezed Interval 8780/8794 Set cement retainer. Squeezed with 150 sacks Class "G" Cemento Final squeeze pressure 4500 psio Drilled out and pressure tested to 3000 psi. Squeeze did not hold. Resqueezed Interval 8780/8794 Set retainer at 8484' and squeezed with 50 sacks Class G cement. Final squeeze pressure 4750 psio Drilled out and pressure tested to 3000 psio Squeeze broke down 0 Injection rate 2~ bbls/mino at 3600 psio Attempted to Resqueeze Interval 8780/8794 Set retainer at 8560'. Attempted to break down formationo Pressure built up to 4000 psi and held. Retested perforations at 6574/6615. Held 3000 psi. Perforated and Squeezed at 9030' Drilled out retainer at 8560 and cleaned out to 9500'0 Perforated 4 holes/ft. at ,9030. Set retainer at 88300 Squeezed with 60 sacks Class "G" Cement. Final squeeze pressure 4000 psi. Approxo 10 bbls of cement outside casingo Drilled out retainero Cleaned out to 9500'. Pressure tested perforations to 3000 psi. Held pressureo Perforated and squeezed at 9020' Ran CoBoLo Perforated 4 holes/ft. at 9020'. Set retainer at 8820'. Broke formation down with 3000 psio Injection rate 3 bbls/min. at 2600 psi. Squeezed with 60 sacks Class "G" Cemento Final squeeze pressure 4500 psio 40 sacks out perforationso Drilled out retainer and cement from 8980 - 9020. Squeeze held 3000 psi for 15 mino Perforated and ran WSO #1 Interval 9020/9030 & 8993/8995 Ran C.BoLo Perforated with 4 holes/ft. interval 9020/9030 & 8993/89950 Ran Halliburton test tools and set packer at 8962' 0 Tail at 8972. Opened for IFP Closed for ISIP Opened for FFP Closed for FSIP End of FSIP (See attached test resultso) Reversed out fluid and pulled test tool. Conditioned mudo Tried to set bridge plug on wire line. Plug hung up at 8790' 0 Released bridge plugo Drilled out bridge plugo Set bridge plug on wire line at 9010'. 10:38 PM 10:43 PM 10:53 PM 1:10 PM 11/16 - 18 Squeeze cemented Interval 8993/8995 ~..r.lt! .. 'If"''r'' ~'r .(-., T I ~Il~ . 'p rj~ ~ ,J.. ~d )\ ~~ I~~ "n,' f :~¿.) \:)J ;] \J 1;: ~'] l; .':.' ,of,! \i \;:.! :i ::] ..""".. .\ ~~"". Set cement retainer at 8953' 0 Broke formation down with 1500 psio Injection rate 3 bbls/min. Squeezed with 150 sackso Final squeeze pressure 3500 psio Plugged 21 jts. of drill pipe. Drilled out retainer and cemento Pressure tested squeeze to 3000 psi for 15 min. Drilled out bridge plug at 90100 Ran CoBoLa 11/18 - 20 Perforated and squeeze cemented at 8948 Set bridge plug at 8970' 0 Perforated with 4 holes/fto at 89480 Set cement retainer at 8750' 0 Broke formation down with 2800 psio Squeeze cemented with 50 sacks Class "G" cement. Staged cement in 3 - 10 min- ute intervalso Final squeeze pressure 3500 psio 40 sacks through perfor- ationso Drilled out retainer at 8750' and cement from 8896 to 8948. Cleaned out to bridge plug at 8970' 0 Pressure tested squeeze with 3000 psi for 15 minuteso 11/21 Perforated and squeeze cemented at 8860' Set bridge plug at 8885' 0 Perforated 4 holes/fto at 8860' 0 Set re- tainer at 8850' ,could not break down formation with 4500 psio Found retainer at 8854'. Drilled out retainero Pressured up on perforations, broke down at 1750 psio Injection rate 3 bbls/min. at 2250 psio Set retainer at 8587' 0 Broke down formation with 1750 psio Injection rate 3~ bbls/min. at 600 - 1200 psi. Pumped 100 sacks of Class "G" cement with 10 bbls of water ahead and 10 bbls behindo 75 sacks out perfora- tions. Final squeeze pressure 3500 psi. Drilled out retainer at 8587 and cement to 8861'. Pressure tested squeeze with 3000 psi for 15 minutes 0 Drilled out bridge plug at 8885' 0 11/24 - 25 Perforated and attempted squeeze cement at 8740 Ran bridge plug on wire line and set at 8760' 0 Jet perforated 4 holes/ fto at 8740' 0 Left gun in holeo Ran overshot on drill pip eo Closed pipe rams and pressured up on perforationso Broke down at 2700 psio Injection rate 2 bbls/mino at 3000 psio Recovered portion of fisho Set cement retainer at 8540' 0 Pressure to 4500 psi could not break down. Drilled out retainero Closed rams and pressured up to 3500 psio 11/25 - 26 Perforated and attempted cement squeeze at 8712 Jet perforated 4 holes/fto at 8712'. Set cementing retainer at 8500' 0 Broke down formation with 3000 psio Injection rate l~ bbls/mino at 3400 psio Pressure built up to 3500 psio Held for 15 min. without taking any fluido Pulled out of holeo Drilled up perforating gun and bridge plug at 8760' 0 Ran CoBaLa 9500/86000 11/26 - 28 Perforated and ran WSO #2 at 8988/8990 Set bridge plug at 9010' a Jet perforated with 4 shots/fta at 8988/89900 Ran Halliburton test toolso Set packer at 8960a Tail at 89750 Opened for IFP 2:41 Closed for ISIP 5:40 1'"(.1':'; ~., .... . , i .í ~J [ : ~-'~~[, ~; '.", . \jl ni,~ J ¡1) E (i,JTf ,A r Fluid did not surfaceo Reversed out water and emmulsion and pulled test toolso Perforated 4 holes/fto at 9015' 0 Set bridge plug at 9018' 0 Set retainer at 8777' 0 Broke formation down with 3200 psi. Injection rate l~ bbls/min. at 2700 psi. Pumped 100 sacks Class "G" cement. Final squeeze pressure 3500 psio 60 sacks out perforationso Drilled out retainer and cement. Pressurred up on perforations. Broke down at 2100 psio 11/30 - 12/1 Resqueezed Interval 8988/8990 and 9015 Ran and set cement retainer at 8780. Broke formation down with 2100 psi. Injection rate 1 bbl/min. at 1500 psio Pumped 100 sacks Class "G" cemento Final squeeze pressure 3500 psio Squeezed 50 sacks out perforationso Drilled cement retainer and cement to 8972'. 12/2 - 3 Perforated and Ran Test #1 8960/8970 Jet perforated with 4 holes/ft. interval 8960/89700 Left gun in holeo Ran overshot and recovered gun. Ran Halliburton test tools and set packer at 8910 with tail to 89250 Opened for IFP 11:10 PM 12/1/69 Closed for ISIP 11:15 PM 12/1/69 Opened for FFP 1:18 AM 12/2/69 Closed for FSIP 9:55 AM 12/2/69 End of FSIP 11:00 PM 12/2/69 Reversed out 85 bbls oil and 12 bbls water and pulled test toolso (See attached test resultso) Set bridge plug at 8938'0 12/4 - 5 Perforated and Ran Test #2 8880/8900 & 8914/8924 Jet perforated with 4 holes/fto interval 8880/8900 and 8914/89240 Ran Halliburton test tools. Set packer at 8850'with tail to 8865. Opened for IFP Closed for ISIP Opened for FFP Closed for FSIP End of FSIP 8:30 AM 8:35 AM 10:35 AM 4:40 PM 1:40 AM 12/4/69 12/4/69 1214/69 12/4/69 12/5/69 Reversed out 90 bbls of mud and pulled test toolso Found clean oil in sample catchero Charts indicated test tool was pluggedo (See attached test resultso) 12/6 - 8 Ran Test #3 to Retest Interval 8900/8880 & 8924/8914 Ran Halliburton tester and set packer at 8829' with tail at 8844'. Opened for IFP 10:29 AM Closed for ISIP 10: 34 AM Opened for FFP 12:40 PM Closed for FSIP 5:25 AM (12/7/69) End of FSIP 3:55 AM (12/8/69) :ONFIDENTIAl Reversed out fl~id of drill pipe and pulled test toolso (See attached test resultso) Lost 200 bbls of mudo 12/9 - 10 Ran Test #4 to Retest Interval 8900/8880 & 8924/8914 Ran Halliburton tester and set packer 8841' with tail at 8856' 0 Opened Closed Opened Closed End of 6:25 PM 6:30 PM 8:30 PM 3:30 PM 12:30 for IFP for ISIP for FFP for FSIP FSIP 12/9/69 12/9/69 12/9/69 12/11/69 12/13 - 14 Reversed out fluid and pulled test toolso (See attached test results.) Perforated and Ran Test #5 on Interval 8770/8805 Set bridge plug at 88500 Jet perforated with 4 holes/fto 8770/88050 Ran Halliburton test tools and set packer at 8725' with tail at 8735'. Opened Closed Opened Closed End of for IFP for ISIP for FFP for FSIP FSIP 12:30 AM 12:35 AM 2:35 ~ 8 : 45 AM 6:50 PM Reversed out fluid and pulled test tools. 12/14 - 15 Squeeze cemented Interval 8770/8805 12/13/69 12/13/69 12/13/69 12/13/69 12/13/69 Ran and set cement retainer at 8550. Broke down formation with 750 psi. Injection rate 2 bbls/min. Squeezed with 150 sacks Class "G" Cement. 140 sacks out perforationso Staged with 5 stages of 5 min. each. Final squeeze pressure 3500 psio Drilled out cement retainer and cement to 88050 Pressure tested squeeze jobo Broke down at 2200 psi. 12/16 - 17 Resqueezed Interval 8770/8805 Ran set cement retainer at 87200 Broke formation down with 2200 psi. Squeezed with 75 sacks of Class "G" cement in 3 stages. 70 sacks out perforationso Final squeeze pressure 3000 psio Drilled out cement retainer and cement. Pressure tested squeeze job. Broke down at 2200 psi. 12/17 - 18 Resqueezed Interval 8770/8805 Ran and set cement retainer at 87000 Broke formation down with 2200 psio Squeezed with 100 sacks of cemento Final squeeze pressure 3500 psi.75 sacks out perforationso Drilled out cement retainer and cemento Pressured up to 3000 psio Squeezed job broke downo Injection rate at 3100 psi was 2 bbl/mino 12/18 - 19 ~~12/20 - 21 ""~' 12/21 - 22 12/22 - 23 ~---,12/23 - 24 12/26 12/27 rCt-a ~FfDENT J Ä [ Resqueezed Interval 8770/8805 Ran and set cement retainer at 8700'. Squeezed with 90 sacks of Class "G" cement in stages. Pressure did not build up.. Cleared perforations with water and reversed outo No cement return~ Spotted 20 bbls of water and broke formation down. Injection rate 1 bbl/mino at 3600 psi. Pumped 90 sacks Class "G" Cement in stageso Final squeeze pressure 3600 psio 55 sacks out perforationso Drilled out cement retainer and r::ement to 8805' 0 Pressure tested with 3000 psi for 15 min. Perforated and ran WSO #3 6730/6735 Ran and set bridge plug on wire line at 6800'. Jet perforated 6730/6735 with 4 holes/ft. Ran Halliburton test toolso Set packer at 6712 with tail at 67270 Opened tool at 4:25 AMo No blow at surfaceo Closed tool at 6:30 AM 12/21/690 Reversed out and pulled test toolso Reperforated and ran WSO #4 6730/6735 Jet perforated with 2 holes/fto interval 6730/67350 Ran Halliburton test toolso Set packer at 6682 with tail at 6697. Opened tool at 8:52 PM 12/,27/69. Very weak blow--dead at 9:00 PM. Shut in at 12:38 AM, 12/22/690 Reversed out fluid and pulled test tools 2:55 AM 12/22/69. Reversed out 100 bbls of water cut oil and watero Squeeze cemented interval 6730/6735 Ran and set cement retainer at 6700'0 Broke formation down with 2200 psi. Injection rate at 1400 psi was 2 bbl/mino Pumped 120 sacks Class "G" cement with 103% D-60 in stages. 80 sacks out perforationso Perforated and ran Test #6 6570'/6604' Jet perforated with 4 holes/ft. 6570'/6604'. Ran Halliburton test tools. Set packer at 6493' with tail at 6508'. Opened for IFP Closed for ISIP Open for FFP Closed for FSIP End of FSIP 10:10 AM 10:17 AM 12:17 AM 10:35 PM 2:45 PM 12/23/69 12/23/69 12/23/69 12/23/69 12/24/69 (See attached test resultso) Reversed out oil and pulled test toolso Questionable test due to high oil rate and low GOR. Tested squeeze cement, job 6730/6735 Ran RTTS toolo Pressure tested squeeze cement job 6730/6735 with 2000 psi for 15 min. Test #7 -- Retested interval 6570/6604 Ran Halliburton test toolso Set packer at 6525' with tail at 65410 12/28 12/29 12/30 12/31 1/1/70 1/1 1/18 r""",C~'" ~ N r i n" r: K~ T I ~^"~ I ~ .\ I,~t\ , ::;1 f~~~ : V. ;, , f!~:, . ' , '> ," ~1 'I' r :;,,<::11 H:,., ", ~, ^-. \~U'" J i;J '\J (Jj i~ ß 1;1 U ':' ,¡I ',~ "".j\ ' '" s.¡ \1 í::J LI l'"é9 !:."~!.I ¡j , ~~ ;!i ~ ,,:~ Opened Closed Opened Closed End of 2:35 AM 2:40 AM 4:40 AM 11:07 AM 8:55 PM 12/27/69 12/27/69 12/27/69 12/27/69 12/27/69 for IFP for ISIP for FFP for FSIP FSIP (See attached test result so) Reversed out oil and pulled test tools. Opened additional production interval 8970/8982 Conditioned mud and drilled out retainer at 8825' 0 Cleaned out hard cement to 89850 Jet perforated with 4 holes/ft. 8970'/8982'. Ran bit and scraper. Conditioned mud. Layed down drill pipe. Ran junk basket and gage ring. Stuck junk basket and gage ring. Top of fish 89740 Picked up 3~" tubing with overshoto Fished out collar locatoro Left junk basket in hole (46~" long)o'lop of fish 8981' 0 Completion Ran Otis WoBo permanent packer on wire lineo Packer stuck at 7114. Pulled wire line out of socket. Ran in with overshot on 3~" tubing. Found packer at 8967' 0 Worked over fish. Recovered 10' of fish consisting of Schlumberger tools and Baker 20 setting toolo Left production packer in hole 0 Top of fish 8977' ,0 Conditioned mud. Ran Schlumberger junk basket and gage ring to 8947'. Ran and set Otis WoBo permanent production packer (small bore 3025") on wire line at 8.945'. Ran and set Otis permalatch production packer (5" bore) to ~833' 0 Ran 3~iI tubing with bottom sealso Set seals in packer and tested annulus with 1000 psi for 15 min. Dumped mud and mixed salt watero Displaced a total of 783 bblso of salt watero Dis- placed tubing with 110 bbls of dieselo Set 7" Otis permalatch packer at 6550' with 1000 psi. Ran plug on wire line to set in Q nipple at 89350 Wire line parted at surface. Ran in with spear. Engaged wire line and jarred pff pl~g~ Ran in with overshot and recovered plug. Set plug in Q-nipple at 8935'. Tested tubing to 4000 psi. Set X-Plug in top X-O sleeve.. Attempted to release tubing at overshot divide. Backed tubing off at 5430. Changed out one jt. 3~" tubing and re-ran. Screwed in at 5430'. Backed off at dividero Ran tubing open ended to 6520' 0 Displaced with 300 bbls salt watero Swabbed 3~" tubing and 7" casing dry to 1270' 0 Removed BoOoP. Attempted to remove drilling spoolo Found 9-5/8" casing flared and worn. Unable to remove wear ring. Installed tubing head on spoolo Picked up 3~" tubing with Otis overshot dividero Ran tubing and insulated top 700'. Installed tubing donut. Installed treeo Tested to 4000 psi. Attempted to recover plugs in tubingo Tools would not pass through donut. Removed tree. Removed donut. Flew donut to Fairbanks to machine 1/16" out of loDo Reinstalled ( C.". ".. 1 lIS I D' ,'" ~~ '1' I A I ( , , ,:¡ ~~Q , \., ~"~~ ¡X\ ' ¡ íJì II ~ \ij f~ :: 6 " J tî' U' :J ,~t;;t: , ' v ¡¡] 'it U . ~i..' [~ill " 5 û ~ donut and tree 0 Opened both sleeves and flowed wello Closed cretaceous sleeve. Displaced tubing with 10 bbls diesel. Ran ball valve and pressured up to 5000 psi. 1/19 Released rig. ':.' /,~i!I!" ..,.><. 5. API Nu:\1:ERlCAL CODE OKG 50-029-20014 KLV -,-, 6, LEASE DESIGNA nON AXD ~~~~lS._,_- ADL 28241 REl í;, J,.. t) Form No. P--4 REV, 9-30-67 STATE O\'--ÂlASKA OIL AND GAS CONSERVATION COMMITIEE MONY'HL Y RE;PORT OF DRILLING AND WORKOVER OPE;RATIONS SUBMIT IN DUPLICATE 1. 7, IF INDIA~, ALOTTEE OR TRIBE NAME OIL rXJ GAS 0 WELL ~ WELL OTHER -Phillips 2. NAME OF OPERATOR Mobil Oil Corporation 3. ADDRESS OF OPERATOR P. O. Box 1734, Anchorage, Alaska 99501 1f 3 - 11- 11 10, FIELD A.."lD POOL, OR WILDCAT 4, LOCATiON OF WELL 1521' FEL & 2176' FSL, Sec. 3, T11N, R11E, U.P.M. Wildcat 11. SEC,. T.. R., M.. BOTI'OM HOLE OBJECT~ ~-.:_-_.~.-~~"--~--_.c---_.~-----,----c-~----~-~_.' ~--.-.~- -- ---------.--->-------- Sec.'3, TllN, RilE, tTPM 12. PERMIT NO, 69-25 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS. TESTS AND RESULTS. FISHING JOBS, JUNK IN HOLE AND SIDE-TRACKED HOLE AND' ANY OTHER SIGNIFICANT CHANGES IN HOU¡: CONDITIONS. January 1970 Ran in with Otis packer, on wire line. Stuck tools. Ran in with overshot on 3 1/2" tubing and recovered packer setting tools leaving 9 5/8" packer, gage ring and junk basket in the hole. Top of fish at 8977'. Set 9 5/8" Otis permanent production packers at 8945' and at 8833'. Landed 3 1/2" tubing in packers and set Otis Perma1atch packer at 6531'. Fluid level in 3 1/2 - 9 5/8" annulus swabbed to 1000':t. Tubing insulated from surface to 704'. Installed tree and pressure tested to 4000 psi. Installed ball valve in tubing at 520' and tested to 2500 psi - O.K. Flowed well to burn pit for 6 hours to clean up well and shut in. Released rig at 1:00 PM, 1/19/70. Final Report I .tJì,', :# .":) FEf3 I ð ~. /-, ., k" ~ 'lSION Ã...OFc" . '< """,CHO/{/: -~,;;IJ SIGNED Division Engineer DATE 2/16/70 NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicatt with the Division of Mines & Minerals by the 15th of the succeeding mo nth, unless otherwise directed, MJM/ rp ~ þ ... , " - , - HLB ¡rv'J .- TRM ~-14t, ~ OKG- Form No. P-4 REV. 9-31>-67 STATE OF ALASKA SUBMIT IN DUPLICATE . . - . OIL AND GAS CONSERVATION COMMITTEE MONT'HL Y RE'PORT O'FDRILLlNG AND WORK OVER OPERATIONS 5. API NU:VIERlCAL CODE 50-029-20014 ~~,,,,(!.f \,,- 1~. .. 1- 1!1- 6. LEASE DESIGNATION AXD SERt.A!l)--NO. "'T -.j ~,.. c~ ADL 28241 -,-- .- - 1. ... 7. IF INDIAN", ALOTTEE OR TRIBE NV\IJt!'J!: - - OIL f'X1 GAS 0 WELL U WELL OTHER 2. NAME OF OPERATOR Mobil Oil Corporation 3, ADDRESS OF OPERATOR P. O. Box 1734, Anchorage, Alaska 99501 --- 8. UNIT,FARM OR LEASE NAME Mobil-Phillips, W. Kuparuk St. 9, WELL :r\O. 113-11-11 1521' FEL & 2176' FSL, Sec. 3, TllN, RIlE, UPM 10. FIELD A.."JD POOL. OR WILDCAT Wildcat 11, SEC., T.. R., M.. (BOITOM HOLE OBJECrIVE) Sec. 3, TllN, RIlE, UPM 4. LOCATION OF WELL 12. PERMIT NO. 69-25 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE. CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS. TESTS AND RESULTS. FISHING JOBS, JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOU¡: CONDITIONS, December 1969 Cleaned out to 8972' and perf'd 4 holes/ft - 8960'/8970'. Ran DST on perfs. Fluid did not surface. Set a bridge plug @ 8938'. Perf'd 4 holes/ft 8924'/8914' and. 8900/8880'. Ran DST and tester plugged. Re-ran DST & flowed at estimated 1000 B/D. Surface recorders malfunctioned. Re-ran DST & flowed at maximum stabilized rate of 2500 B/D. Set bridge plug at 8850'. Perf'd 4 holes/ft 8770'/8805'. Ran DST. Fluid did not surface. Reversed out and recovered no oil. Squeezed perfs 8770'/8805' with 340 sax glass G cement in 4 stages. Set bridge plug at 6800'. Perf'd 4 ho1es/f~ 6739'/6735'. Ran DST. Fluid did not surface. Reversed out 80 bbls. of water and 10 bb1s. of oil cut mud. Squeezed perfs 6730'/6735' with 80 sax class G cement. Press tested w/2000 psi, OK. Perforated 4 holes/ft 6570'/6604'. Ran DST, fluid surfaced and flowed oil for ten hours during which separator problems occurred and flow measurement was incorrect. Estimated rate 1000 B/D. Re-ran DST on interval 6570'/6604'. Flowed oil at 2208 B/D rate. Drilled out bridge plugs and cement to 8985'. Perforated 4 holes/ft 8970'/8982'. January 1, 1970 -- Preparing to run production packers and tubing for completion. COt\f\D[N1\~l L\~tt;~V ~ttJ. Division Engineer SIGNED NOTE-Report on this form is required for each calendar month, regardless of the status of 0 rati with the Division of Mines & Minerals by the 15th of the succeeding mo nth, unless otherwise direct, /0..', - , 6, LEASE DESIGN'A nON AXD S L NO,'-, . u,' ADL 28241 H\\/:,(_L- RS~ Form. No. P-4 REV. 9-30-67 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONT'HL Y RE'PORT O'FDRILLlNG AND WORKOVER OPERATIONS SUBMIT IN DUPLICATE 5, API NIDiERlCAL CODE 50-029-20014 1. 7, IF INDIAN', ALOTTEE OR TRlffiõ:-'NAME OIL rvJ GAS 0 WELL ~ WELL 2. NAME OF OPERATOR OTHER P. O. Box 1734 Anchorage, Alaska 99501 8'~6Tii~1\~ttp~ N West Ku aruk State 9, WELL 11;'0, #3-11-11 Mobil Oil Corporation 3, ADDRESS OF OPERATOR 4, LOCA nON OF WELL 10, FIELD A.~D POOL. OR WILDCAT Wildcat 1521' FEL & 2176' FSL, Sec. 3, TIIN, RIIE, UPM 11. SEC., '1'.. R., 1\1:,. BOITOM HOLE OBJECTIVE) Sec. 3, TIIN, RIIE, UPM 12. 6~I5 NO, 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS. FISHING JOBS. JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOU¡: CONDITIONS. November~1969 Pressure tested Squeezed holes, 4000 psi, ok. Perf'd 4 holes at 9030' & squeezed with 56 sax Class G. & pressure tested with 3000 psi ok. Ran CBL perf's 4 holes at 9020' and squeezed w/40 sax. Tested w/3000 psi. ok. Ran CBL Perforated 4mJft. 8993'/8995"and ran. short DST for WSO Fluid did not surface. Recovered oil & water. Squeezed ho~es 8993'/8995' w/95 sax Class G. Pressure test w/3000 psi ok. Perforated 4 holes @ 8948' and squeezed with 40 sax Pressure test with 3000 psi ok. Perforated 4 holes @ 8860' and squeezed with 100 sax. Pressure test with 3000 pit ok. Set bridge plug at 8760'. Perf'd 4 holes at 8740' and test w/4500 psi ok. Perf'è 4 holes @ 8712' & test with 3500 psi, OK. Re-squeeze perfs 8988'/8990' and 9015' with 100 sax in two stages. perfs 6574'/6585' w/4500 psi ok. 8780'/8794' w/350 sax Class G in 3 stages & pressure tested with DECEMBER 1, 1969 Preparing to perforate & DST.~ ktttïVt¡¡; CONFIDENIIA[ ... ,,", In -1 Qf'fì.. t::. !.('~ ,DIVISION OF OIL AND GAS ANCHORAGE NOTE-Report on this form is req d or each calendar month, regardless of the status of operations, and must be filed in duplicatt with the Division of Mines & Minerals 6y e 15th of the succeeding mo nth, unless otherwise directed. TITLE Division Engineer DATE 12-15-69 14, I hereby ceifY Jllrt t SIGNED (f ~ \: , Fonn No. P-4 REV. 9-:10-67 ;~ STATE OF- ALASKA ,-.. ............." P! 1/;' .J' SUBMIT IN DUPLICATE OIL AND GAS CONSERVATION COMMITIEE . , 5. API NID'IERlCAL CODE 50-029-20014 MONTHLY REPORT OF DRilLING ANDWORKOVER OPERATIONS 6. LEASE DES:GNA'rIO:>l AXD SERIAL NO. ADL 28241 t¿ " ( 1. 7. IF INDIAJ'S, ALOTTEE OR TRIBE NAME OIL ðñ GAS 0 WELL CJ WELL .2. NAME OF OPERATOR Mobil Oil Corpqration OTHER 3. ADDRESS OF OPERATOR P. O. Box 1734 Anchorage, Alaska 99501 8.. ,tJ~I¡..f A.ß!! Ç>R L~ASE NAME MOb~"1-Ph~ll~ps West Ku aruk State 9, WELL !l;O. #3-11~11 1521' FEL & 2176'FSL, Sec. 3, TIIN, RIlE, UPM 10. FIELD A."D POOL. OR WILDCAT Wildcat . 4. LOCATION OF WELL 11. SEC., T., R.. 1\1,. {BOTTOM HOLE OBJECTIVE} . Sec. 3, TIIN, RIlE, UPM 12. PERMIT NO. 69-25 13. REPORT TOTAL DEPTH AT END OF MONTI!, CHA."'GES .IN HOLE SIZE, CASING AND CEME.~TING JOBS INCLUDI:'olG DEPTH SET AJ'I¡J:) VOLUMES USED. PERFORATIONS. TESTS AND RESULTS, FISHING JOBS. JUNK L~ HOLE AND SIDE. TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOr.æ CONDITIONS. October 1969 Activated Rig Drilled out cement 1300',1520', @ 8520'. . . Cleaned out to 9547' P.B.T.D. Ran GR-CBL Set BP @ 6623'. Squeezed holes 6574'/6585' with bridge plug @ 1520 and cement bridge plug 264 sac Class G in 4 stages. November 1, 1969 WOC prior to pressure testing squeeze job. ft." ~ t~,¡ .;1 ~ ~ ¡","'~~'I.'''''. if'", . ~ ~ ti t~~.~ ~ IìJ! 'Wm '~"..~ I t1 ¡r>¡1\ m I ti IÍI ï; t:,~~ j(~(.~~Vt~ f^' Q. \/ 2 o. "'9"'=.'9' . " '-' I 0 ... ÐJYJSJON OF 011 AND GAS ANCHORAGE Division Engineer DATE November 24. 1969 with ~~:~iVi~i:or:f O~j~:~S ~O~~n~~alst<:~e f~~l~a~ ~::e~~::e:~~:h'm: ~~~~d~~I:ssOf ot~::w~~:t~~re~:e~:eraliqnS, and must be filed in duplicatt J'Qrfn 11'-3 R:EV. 9-3»4'1 ~ IS1Ibt1'ût "lttW1tions" in Triplicate &I: "Su.Qaeq1ieJ!lt Reports" in DuJ)Ücate 5. API NUMERICAL CODE OfL AND GAS CONSERVATION COMMmæ 50-029-20014 6, LEASE DESIGNATION AND SERIAL NO. SUNDRy NOTICES AND .RIfÞOIITS ON WILLS ADL 28241 (Do not use this form for proposals to drill or to deepen or plug back to a diffierent reservoir. Use "APPLICATION FOR PERMIT-" for such proposals,) 1. 7, IF INDIAN, ALLOTTEE OR TRIBE NAME ! OIL fi GAS 0 ' WELL WELL OTHER .. 2. NAME OF OPERATOR 8. UNIT, FARM OR LEASE NAME Mobil Oil Corpo ration Mobil-Phillips West Kuparuk S 3. ADDRESS OF. OPERATOR 9. WELL NO, P. O. Box 1734 Anchorage, Alaska 99501 #3-11-11 4. LOCATION. O'F WELL 10. FIELD AND POOL, OR WILDCAT At surface Wildcat 1351 'FEL, 2191' FSL, Sec. 3, T 11N, R11E, U.P.M. 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 3, T11N R11E ~ u.P.M. 13, ELEVÃTIONS (Show whether DF, RT, GR, etc. 12. PERMIT NO. STATE of AlASKA f-- ß ill tV' tate 14. Estimated 60' G.R. I 69-25 Check Appropriate Box To lincic:ate Nature of Nk>ti'ce, Report, or Other 'Data NOTIcm OJ' INTBNTION TO: IUB8zqUIINT BIIPOBT 01': ::::.:::. :aR:4:u'f"(),s'J' ~.. . ::::J::::::P~:::YO :~::::.R::::"... H ::::::::0 c::~:o ~ SHOOT O. ACIDIZIII -- ABANDON- SHOOTING OR ACIDIZING 0 ABANDONMIIN'T-- REPAIR WIIILL CHANGII PLAl'I'S (Other) (Other) Run Product'; on Test & Com (NOTII: Report results of multiple completion on Well .L. e e Completion or Recompletion Report and Log form,) 15. DESCIUBE PROPOSED ßR CO~fPLETÉD OPERATIO~S (Clearly state all pertinent details, and give pertinent dates, includln&, estimated date of starting an>" propoMtd work. , . Estimate starting date of production testing 10.25.69. It is proposed to reactivate_this well in order to run drill stem production tests on the various potentially productive sands as follows: 1. Drill out cement plugs and bridge plugs as necessary to 9521'. 2. Cement squeeze and/or pressure test the following: Perforations 6574'/6585' Perforations 8780'/8794' 3. Run cement bond log and perforate and squeeze as necessary for WSo. 4. Perforate and DST selected intervals in the Sadlerochit sands. 5. Perforate anq DS~ Selected intervals in the Jurassic sands. '(~l~~5 V tA~ 2' o< "1("(') :' I~)b:; 6. Perforate and DST selected intervals in the Cretaceous sands. DJVJSIONOFOllANDGk) ANCHORAGE 7. Squeeze perforations dependent on results of production tests. Area Engineer DATE 10.20.69 (Thi8 space for State office use) APPROVED BY ~ CONDITIONS OF APPROVAL. IF ANY: '1'ITLID 6/ ~-- 4/A"'~ DATE /~ ~:?-~~ See 'n,strucfions On Reverse Side ÄPP;.õvéå Copy Returned -L ~/.t ?h 'j' ,'~ Mobil Oil Corporation Mr. Harry Kugler S ta te of A laska Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska Dear Mr. Kugler: ,,---...., 700 "G" STREET ANCHORAGE, ALASKA 99501 P.O. Box 1734 Anchorage, Alaska September 25, 1969 .v" \: The following well information and samples were delivered to the Alaska Division of Oil and Gas on September 25, 1969: Mobil-Phillips North Kuparuk State #26-12-12 1) Two copies of Stat~ P-7 fo~ 2) Two copies of Well' History 3) Two copies of Core Descriptions 4) Two copies of Drillstem Test Results 5) One sepia each of 2" E-Log and Mudlog 6) One blue line each of 2" E-Log and Mudlog Mobil-Phillips West Kuparuk State #3-11-11 1) One sepia and one blueline of Sidewall Core Descriptions 2) One set of Core Chips 3) One set washed am dried ditch samples Please acknowledge receipt of the above by signing and returning the duplicate copy of this letter ,to us at the above address. HCH/pjc J V'',;" ~,",~ (~'."' (I ') , ': /'-. ,.'. \., (, / ._.;." U ,L.A: ,\.,) /\" /...../ .. . , . - (~9 Sincerely, /'¿;p c: ?~.~ Harry C. Hixson .'~. l"orm No. P-4 REV. 9-30-67 STATE OF ALASKA SUBMIT IN DUPLICATE .-.... CONFIDE OIL AND GAS CONSERVATION COMMITIEE "JiO'NTHL Y REPORT OF DRILLING AND WOR-KOVER OPERATIONS 50-029-20014 6. LEASE DES;GNA nON AXD S . ICLV ---- HWK 1.0-./ t' 5. API Nv'":\1ERICAL CODE ADL 28241 1. 'i. IF INDIAN", ALOTTEE OR TR á OIL 0 WELL GAS 0 WELL Wildcat OTIl ER Mobil Oil Corporation 8. v~IT F.o\lU.1 OR LEASE N~ Mobil-Phillips WØi 1("1'- '1 Et... 2, NAME OF OPERATOR 3, ADDRESS OF OPERATOR 9. WELL !\O P. O. Box 1734 Anchorage, Alaska 99501 Att: R. A. Gallis n 3-11-11 . 4. LOCATION OF WELL 10. FIELD A.-.;'D POOL, OR ,,",ILDCAT Wildcat 1531' FEL 2l9l'FSL 11, SEC.. T.. R., M.. (BOITOM HOLE OBJECTIVE) Sec 3 - TllN- RIlE, UPM Sec 3 - TllN - RIlE, UPM 12, PERMIT NO, 69 - 25 13. REPORT TOTAL DEPTH AT E.~D OF MONTH, CHA..'-:GES IN HOLE SIZE. CASING AND CEMENTING JODS INCLUDING DEPTH SET A..""D VOLUMES USED, PERFORATIONS. TESTS Al'1'D RESULTS. FISHING JOBS, JUNK IN HOLE AND SIDE.TR:o\CKED HOLE A.."íD ANY OTHER SIGNIFICANT CHANGES IN HOL]¡: CONDITIONS. . Report for August 1969 Drilled 8 1/2" hole to total depth of 11,532'. Reached a total depth of 11,532' on 8/3/69. Suspended bottom portion of hole filled with heavy mud. Placed cementt'plug 111 9850', d~splacing 120 sax class G cementmixe.d wi th 50 lbs. of D-13-R ~ retarder. D.O. 'uC. to 9671',' H:!aving a 179' plug, 23' of cement abov.e .shoe of 9 5/8" casiFlg. Perforated 4 H/F 8780'/8794'. and ran tight hole DST. Placed cement plug 112 at -9671', displacing 50 sax class G cement. Placed bridge plug ill at. 8520' , 'leaving open perforated. interval 8780' /8794'. Placed cement plug #3 at 8520', displacing 20 sax class G cement. Perforated 4 H/F 6574'/6585' and ran tight hole DST. Placed bridge plug 112 at 1520', leaving open perforated interval 6574'/6585'. Placed cemented plug #4 at 1520', displacing 75 sax class G cement. Filled hole l520i to 300i.with heavy mud, top 300' of pipe empty. Well temporarily suspended with blind rams closed on 8/9/69. . HW DST 115 Perfs 8750 - 8794 Rec 3.55 bbls H G C M & o'il-mud emulsion. HW DST #6 Perfs 6574 - 6585 Rec 3.7 bbls sl G C M with small quantity of dispersed oil. Ht(EjVE~ ( , ~~' 1 r; 1969 ~lYJJlON OF OrlAND GAS MfafORAGS - .. . ~~\\~\.. cQ~~\\) 14, 1 hereby certify that the foregoing is true and correct SIGNED &?~-ød~ß. ' Area Geologist TITLE NW Exploration Area DATE September 11. 1969 NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Division of Mines & Minerals by the 15t.h of the succeeding mo nth, unless otherwise directed. !~ ,..-... \ Mobil Oil Corporation 700 "G" STREET ANCHORAGE, ALASKA 99501 P. O. Box 1734 Anchorage, Alaska September 11, 1969 State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. Homer Burrell MOBIL WEST KUPARUK STATE #3-11-11 Gentlemen: In connection with the captioned well, we are enclosing the following: 1) Two copies of well history 2) Two copies of sidewall sample descriptions 3) Two copies of DST summary 4) One sepia and one print of mud log 5) One sepia and one print of IES log Please acknowledge receipt of the above data by signing and returning to us the duplicate copy of this letter. Si~cer;Yy , :;lZ40~¿d:--~- Ha~ C.- Hixson Exploration Geologist HCH/cg Enclosures Received this -di /1 ~&),d~ / / day of ,~-f . 1969. By ...." ~. .'f" " " ' .. ~~~ONFIDENTIAL Form P-7 ~- SÙBMIT ;¡~',,~:r~~~-. m:; ! u- ~~:~~.~~~id~~ 5. API NUMERICAL COD 50 - 029 - 20014 ~ S'ltA TE OF ALASKA OIL AND GAS CON$ÈRVA110N COMMITTEE WELL COMPLETJQ~H..QRJ~f:Ç.QM.P~~~IJQJ~~,g~PpRT AND LOG ~ DRY 0 otber Wi ldc~t 6. LEASE DESIGNATION AND SERIAL NO. ADL 28241 OlI, WELL GAS 0 WELL 7. IF INDIAN, ALLOTTEE OR TRIBE NAME ¡ b. TYPE OF COMPLETION: ¡ NEW 0 WonI< 0 DEEP- 0 ¡ WELL OYER EN 12. N.ui~ OF OPJ:RAT01\ Mo' il..,Q!1~Ç,2-!"1'9,:r.aJJ,P1f '3. ADDRESS OF OPERAToa ¡< PLUG 0 (~ lUFF. 0 DAC,K " r.ESYR. other 1'pmp0r;:¡ry ~l1~r~n~ OWZT,FAKM OR LEASE NAME Mobil-Phillips West Kuparuk St. 9, WELL NO. 3-11-11 10. FœLD AM) POOL, OR WILDCAT Anchora e, Alaska 99501 LOCATION OF WELL (Report location clearly and in acçordance with anti State rèquiremen t,) . At surface 1531' FEL, 2191' FSL, Section 3, T11N, R~lE,U.~.M. Wildcat 11. SEC., T., R., M" (BO'ITOM HOLE OBJECTIVE) Sec. 3, T11n, R11E,UPM. At top prod. Interval reported below same At total depth same, 12. PERMIT NO. 60' Estimated 21, aOTARY TOOLS 11 532 ,," , 9521 Sufface to TD. 22! PRODUCING INTERVAL(S), or Tm$ COMPLETION-1I'OP, BOTTOM, NAME (MD, AND TVD)- INTERV ALS DRILLED BY CABLE TOOLS 23. WAS DIRECTIONAL SURVEY MADE eviation Survey , , ~ ~ 24i ~EELECTRlCAND OTHER ~$'¡RUN -) ~ IE~,Bgc :Sm.1}ic, FDG,: fNP"'l GDM, SWS, Seismic check~hots,. ~. -, ',' , CASING RECORD (Report all strings set in w~U) CASING SIZ¡E '" j,. -~ . GRADE CEl\Ui:iNTING RECORD AMOUNT PULLED ,., WEIGH'l", LB/Fa'. DEPTH SET, (MD) HOLEtsIZE ØÜ, ,j 31 j, " ,,' Z(}' "" 94; ~-,) 1 11-40 305 29 685 sax 1-1 + 3% Fondue ' :i:1;::1'1,H 54 172'&:' '6 .1-55 2411 17 '1/2 2210 ~~; r.1~~~ ~ 9 5/8 43 1/:2 &>;4 S-95 9694 12'lft¿ 965 sax Class G ~. LINER RECORD j 27. TUBING REOORD "",,'S~~~. TOP (MD) jBOTTOM (MD) SACKS CEMENT- SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD) " " " , ~ '.' :. ¡ ' , ,, ' " 28.1 PEíÿ<'O:RA.'!"I°NS OPEN Tþ PRQDUC ['ION (Interval, size and number) 29, j ACID, SHOT, FaAC'T'URE, CEMENT SQUEEZE. ETC. 7~0 to 8794 3 5/8"4V»F DEPTH INTERVAL (MD) AMOUNT .t.ND KIND OF MATERlAL USED 5~4 to 6585 3 5/8114H/E,} ì ( , ; . " --,,-- -.,. ',', :"1 PRODUCTION GAS-M;CF, 8 6 OIL GRAVITY-API (CQRR.) .I 32, LIST OF ATTACHMENTS ,: - :History, Core & DST\ Records mud ,log and Electric Log.,' !¡ . f, . , ¡. '---~;' - -' . :. - -,-- '--;- -;.. 1 33. I hereby certify that the~oregolhg and attached information 18 complete ancJ correct as determIned trom all, available records ! ': . -! ~~I~~iß,;~~Ø~~ ... TITLE'tf'!:i/LI#~<4l1 * (Sée Instructtôri¡' and Spaces for Acfdiflonal Data on Reverse Side) DATE ~Õ~7 \,., INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska, Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- ments given in ether spaces on this form and in any attachments. Items 20, and 22:: If this well is completed for separate production from mor:e than one interval zone (multiple completion), so state in item 20, and in item 22 show the prcducing int€rval, or intervals, ,topes), bottom(s) and name (s) (if any) for only the interval reported in item 3Q: Submit a separate report (page) on this form, adequately identified, for each additional intel val to be seperately produced, show- ing the additional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well should show the details of any mul- tiple stage cementing and the location of the ~ementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). 34. SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL. GAS. WATER AND MUD DST #1 DST #2 DST #3 DST #4 DST Its DST #6 wire1ine test wire1ine test wire1ine test wire1ine test wire1ine ~J~s t f/l@ #2 @ #3 @ #4 @ #5@ ( .' , 4632 6599 8979 8987 8780 6574 2601 2599 2598 9000+ 8981 35, GOOLOGIC MARKERS NAME UE VERT. DEPTH Cretaceous 4460 same Shublik 8805 same Sadlerochit 8958 same Lisburne 9872 same I( \ to 4647 to 6619 to 9001 to 9022 to 8794 to 6585 See attachments for core and DST details :JB.COIlE :DATA. A1wrAClI BRIEF J:)ESCRIPITIONS OF, LITÜOLOG:V:. POROSITY. FRACTURES. APPARENT DIPS AND DETEC1'EDSlIOWSOF OIL, GAS OR WATER, Core ¡pI Core #2 Core #3 Core #4 Core #5 Core II 6 Core #7 Core #8 2709 2974 3304 4347 4575 4626 6587 8637 to 2719 tlO 2983 to 3323 to 4367 to 4587 to 4647 to 6619 to 8655 Core #9 Core #10 Core #11 Core #12 Core #13 Core #14 Core #15 'Core #16, 8899 to 8832 8884 to 8917 8969 to 9001 9001 to 9022 9694 to 9705 lO,~56 to 10,416 10,416 to 1ih,453 11,529 to 11,532 "iJ (~O~.,=lr, )C,lfd ~ ,Ü 'L' \\~~. ~\~ w ~ L",¿t ~~ tl \; ¡; ~7\. . FIELD: WILDCAT WEST KUPARUK ~OBIL OIL CORPORATION SEC. 3, SEPTEMBER 4, 1969 DATE 1969 5/5 - 5/7 5/9 - 5/9 5/9 - 5/13 5/13 - 5/15 5/15 - 5/19 5/19 - 5/21 5/21 - 5/22 TITLE: SIGNED: DRILLING A PAEBOZOIC - MESOZOIC WILDCAT TEST This well was drilled by Peter Bawden Drilling Company using rotary rig #31. All depths refer to Kelly bushing, 80.5' above sea level. Drilling and Opening Hole to 305 feet. Set 30" conductor at 31' and cemented by hand. Spudded well at 2:30 AM May 5, 1969. Drilled 17 1/2" hole to 305', and opened to 24'. Running and Cementing 20" casing at 305 feet. Ran 7 joints 20" 94# casing fi8 305' and cemented with 685 sax 1 - 1 + 3% fondue cement. W. O. C. 48 hours. Fishing For Portion of Broken Slip; Drilling 17 1/2" Hole to 2412'. Ran junk basket and recovered portion of slip. Pressure tested to 500 psi OK. D.O.C. and drilled ahead with 17 1/2" bit to 2412 running deviation surveys every 100' to 200'. Running Sch1umberger Logs to 2400'. Ran the following Schiliumberger wireline services: IES ~ 303' to 2405; BHC Sonic - Gamma Ray - 30~' to 2392'; and temperature log - 120' to 2400'. Running and Cementing 13 3/8" Casing at 2411'. Ran 13 3/8 casing with details from top to bottom as follows: 46 joints, 54 1/2#, J-55, ST & C including DV collar at l3~1' and 5 centralizers. 23 joints, 61#, J-55, ST & C including Baker float collar and guide shoe. Total 69 joints - 2416' Cemented first stage with 780 sax class G cement. Opened DV collar and cemented second stage with 1450 sax of fondue cement. W. O. C. 48 hours. Running CBL; Drilling 12 1/4" Hole 2412 to 2709. D. O. C. and ran Schlumberger cement bond Log finding good bonding. Drilled 12 1/2" hole to 2709'. Cutting Core #1 2709 to 2719; Drilling 12 1/4" Hole 2709 to 2974'. Cored 2709 to 2719 recovering 3' of shale. Reamed rat hole and drilled ahead to 2974'. Qill.' " 5/22 - 5/24 5/24 - 5/26 5/26 - 5/29 5/29 - 5/30 ~. \NFIDENTIAL Cutting Core #2 2974' to 2983'; Drilling 12 1/4" Hole 2983' to 3304'. ACTIVITY r Cored 2974 to 2983 recovering l' oil sand and l' coal. Note: cores 1 & 2 cut with conventional core barrel. Drilled ahead to 3304. Cutting Core #3 3304 to 3323; Drilling 12 1/4" hole 3323' to 4347'. Cored 3304 to 3323 with rubber sleeve barrel recovering 17 1/2 feet sand without shows. Reamed out rat hole and drilled ahead to 4347'. Cutting Core #4 4347 to 4367; Running Schlumberger Logs to 4365'. Cored 4347~ to 4367' with rubber sleeve barrel recovering 18 1/2' of oil sand and shale. Reamed out rat hole and ocnditioned for logging. Waited on Schlumberger tools 21 hours. Ran the following Schlumberger wire1ine services: IES, BHC Sonic and FDC 2410 to 4365 and SNP 1760 to 4365'. Ran three Schlumberg pot tests at 2601; 2599' and 2598'. Unsuccessful because of poor seats in an incompetent formation. Shot 30 SWS recovery in 28. Drilling 12 1/4" Hole 4347' to 4575' Cutting Core~#54575 to 4587'. Cored 4575 to 4587' with conventional barrel recovering 9 1/2'. 5j30---:;'-'5/31 .. Drilling 12 1/4" Hole 4587' to 4626"; Cutting Core 116 4626' to 4647' '. 5/31 - 6/4 6/4 - 6/6 6/6 - 6/14 6/14 - 6/16 6/16 - 6/17 Cored 4626' to 4647' with conventional barrel recovering 5'. Runnin-g--D-ŠT--ÎFi~--4-6-32--'to---4-64i:----'])ri -lIin-g-"-12--i7-4ïï-HolE~4-6-47-'--tö--658-7' . Ran tight hole test assembly and set packers at 4626 and 4632. Test was mechanically successful, recovering salt water. Drilled ahead to 6587'. Cutting Core 117 6587 ,to 6619: Running DST 112 6599 to 6619. Cored 6587' to 6619' with conventional barrel, recovering 3'. Ran tight hole test assembly and set packers at 6595' and 6599'. Test was mehcanically successful, recovering 6il. Drilling 12 1/4" Hole 6619' to 8637': Cutting Core 118 8637' to 8655'. Reamed core hole and drilled ahead to 8637'. Cored 8637 to 8655 with conventional barrel recovering 16'. Drilling 12 1/4" Hole 8655' to 8809': Cutting Core 119 8809' to 8832'. Reamed core hole and drilled ahead to 8809'. Cored 8809' to 8655' recovering 25 feet. Drilling 12 1/4 Hole 8832 to 8884': Cutting Core 1110 8884' to 8917'. Reamed core hole and drilled ahead to 8884'. Cored 8884' to 8917 '" recovering 29'. Lost circulation 8917'. . . DATE ACTIVITY ( '.. " " " :: ,"',-,n ~ ~,....,;;, i;' 'n. :\ ~"" ,":,'",' ~' " l ~ ~ r;, ';j ". :.I..~. ',I \1 \1 ,I~A , II.'." ,.. I). . ,~, ¡i i V j 1~ ~ -,ß~)J~~.J _tJ~~~:J,h::r"~ 6/17 - 6/18 Drilling 12 1/4 Hole 8917 to 8969; Cutting Core #11 8969' to 9001'. Reamed core hole and drilled ahead to 8969'. Cored 8969' to 9001' recovering 32'. 6/18 - 6/20 Running DST #3 8979' to 9001'; Cutting Core #12 9001' to 9022'; Running DST #4 8987 to 9022'. Ran tight hole test over interval 8979' to 9001' recovering mud. Charts indicated tool plugged. Cored 9001' to 9022' recovering 21' of sandstone. Ran tight hole test over interval 8987 to 9022, recovering oil and gas cut salt water. 6/20 - 6/29 Drilling 12 1/4" Hole 9022' to 9694'. RunningSchlumberger Logs. Reamed core hole and drilled ahead to 9794". Conditioned hole for logging. Ran the following Schlumberger wireline services: IES - 9644 to 2411, BHC Sonic 9694 to 4150, FDC - 9694 to 4150, SNP - 9694 to 6500, CDM 9794 to 2411, Pot tester (two runs with one sucessful test), SWS (shot yO with recovery in 55), and seismic checkshots. Conditllioned hole to run casing. 6/29 - 7/2 Running And Cementing 9 5/8 Casing at 9694'. Ran 9694' of 9 5/8 casing with details from top to bottom as follows: 170 joints 9 5/8, 43.5#, S-95, LT & C, from 6952 to surface. 69 joints, 9 5/8, 47 #, S-95, LT & C, from 9694 to 6952. Howco DV Collar at 6986'. Float Collar at 9615'. Float Shoe at 9694'. 239 joints = 9694' at 9694 as follows: First stage with 635 sacks Class G Opened DV tool at 6986 and pumped 330 sacks Class G Nippled up and W. O. C. 48 hours. Total Cemented cement. cement. 7/2 - 7/3 Drilling Out Cement; Cutting Core #13 9694 to 9705. Drilled out D.V. Collar and pressure tested to 3000 psi OK. Drilled out cement & float collar. Pressured casing to 3000 psi OK. Cöred 9694 to 9705 recovering 25.7'. 7/3 - 7/13 Drilling 8 1/2" Hole 9705 to 10,350; Fishing for Stuck Core Barrell. Drilled ahead with 8 1/2" bit to 10,350. Ran in for core #14 and stuck barrel at 10,340'. Backed off fish at 10,111. Ran in with jars and recovered fish. 7/13 - 7/17 Drilled 8 1/2" Hole 10,350 to 10,356; Cutting Cores #14, #15 10,356 to 10,449'. . , DATE { i ,¡ ~ (~~ () 'N\I .~ ~= ~ ~')" I r.:" Ii,'" ,j lr ~ l\ L.', '\..01 ~l ~ ¡ ~ ~"I L,,, rl '1 ~ u r"';\ : ACTIVITY 7/13 - 7/17 continued. Reamed .out hole and made 6 additional feet. Cored 10,356 to 10,384 recovering 28'. Cored 10,384 to 10,415 recovering 31'. Cored 10,415 to 10,449 recovering 34'. 7/17 - 7/18 Running Schlumberger Electric Logs. 9694 to 10,449'. 7/18 - 8/2 8/2 - 8/3 8/3 - 8/8 Ran the following Schlumberger wireline services: IES, ERC Sonic, FDC, CDM, SNP, and seismic check shots. Drilling 8 1/2" Hole 10,449 to 11,529 Cutting Core #16 11,529 to 11,532 TD. Reamed out core hole and drilled ahead to 11,529. Cored 11,529 to 11,532. P. o. H. jars parted leaving core barrel on bottom. Top of fish at 11,459. Recovered fish and 3' of core. Running Schlumberger Electric Logs to 11,5327 Total Depth of Well. Ran the following Schlumberger wireline services: IES - 11,532 - 9694, ERC Sonic, FDC, SNP, and CDM - 11,532 to 10,300. Shot 30 SWS with recovery in 19. Made 4 seismic check shots. Plugging and Completing Well For Temporary Suspension. The following plugs were set and tests run in preparation for a temporary suspension of the well. Plug #1 9850 to 9691 with 120 sax Class G cement W.O.C. 20 hours finding hard cement at 9671. Pressure test to 4000 psi OK. Perforating - Ran Schlumberger Gamma Ray-Neutron-Collar Log. Perforated 4H/F with 3 5/8 ceramic jets 8780 to 8794. Ran tight hole test over interval 8780 to 8794 recovering gas cut mud with trace of free oil. 9521 to 9671 with 50 sax Class G cement. Set bridge plug on wireline at 8520. Capped with 20 sax Class G cement 8440 - 8520. Perforating - 4 H/F with Schlumberger 3 5/8 ceramic jets 6574 to 6585. Ran tight hole test over interval 6574 to 6585 recovering gas cut mud with some clean oil. Set bridge plug on wireline at 1520' capped with 75 sax Class G cement. Left top 300' of hole empty. Closed blind rams, released rig and temporarily suspended well at 6 PM 8/8/69. DST #5 Plug #2 Plug #3 DST #6 Plug #4 \ :( ATTACHMEN'.L TO WELL COMPLETION REPORT ~ ¡j :.:.;.....~ f'O" f\ ~ ~ ~ r.~\\ ~::. V m~~ ¡¡¡;,.JL-. MOBIL-PHILLIPS WEST KUPARUK #3-11-11 OH DST # 1 Item 34 - Summary of Formation Tests OH DST # 2 OH Ð-$T # 3 OR DST 11 4 Perf DST # 5 Perf DST # 6 4632 - 4647 Rec 1.35 bb1s brackish water, 1.05 bb1s mud HP 2326 - 2326 FP 171 - 879 SI~ 1849 6599 - 6619 Rec + 2.6 mud cut oil emu1smon HP 3289 - 3390 FP 884 - 855 SIP 3333. 8979 - 9001 Mis Run - Packers Failed HP 4788 - ~783 8987 - 9022 Rec+ 4 bb1s M & OC SW sl GC RP 4813 - 4781 GP-1676 SIP 4402 8780 - 8794 Rec 3.55 bb1s HGCM & oi1- mud emulsion RP 4764 - 4749 FP 1870 SIP 4502 Rec 3.7 bb1s SI GCM with small quantity of dispersed oil. HP 3460 - 3444 FP 2119 - 3196 SIP 3196 6574 - 6585 WLT #1 2601 } WLT #2 2599 Packer failed to seal properly - mmaruns WLT #3 2598 WLT IIL~ +9000 mis-run WLT 115 8981 tool plugged t r; 0 ~N' f ~ !] !f) .~:- 'l"O~ Û ,rl ,~ '" '" Ii ~ ~~ ~..~" 11 ~ t,,~ L Item 36 - CORE DATA Core #1 2709 - 2719 Coæe #2 2974 - 2983 Core 113 3304 - 3323 Core #4 4347 - 4367 Core #5 4575 - 4587 Core 116 4626 - 4647 Core #7 6587 - ß6l9 Core #8 8637 - 8655 Core 119 8809 - 8832 Core 1110 8884 - 8917 Core 1111 8969 - 9001 Core 1112 9001 - 9022 Core 1113 9694 - 9721 Core 1114 10,356 - 10,416 Core 1115 10,416 - 10,453 Core 1116 11,529 - 11,532 ATTACHM~, TO WELL COMPLETION REPORT MOBIL-PHIRLIPS WEST KUPARUK 3-11-11 rec 3' mudstone w/lignite & plant matter. rec 2' vf ss wloil show and l' coal. rec 17 1/2' vf ss argillaceous - No shows. rec 18 1/2' clay w/occ thin beds vf ss or silt wlshow of oil. rec 9 1/2' siltstone w/scat sandy lam.& scat shows of oil. rec 5' siltstone wIsh & vf sand lam. Fair oil shows in coarser lam. rec 1 1/2' vf glauconitic ss, fair proosity with show of oil. rec 16' hard dark gry shale. No shows. rec 23' dk gry argillaceous limestone and calaareous sh, fossiliferous. rec 29' interbedded Is and sh, blk, foss, wlocc thin Eones of fair porosity. Vertically fractured, bleeding oil along frac planes. rec 32' ss wlscat thin shale beds. Fair to good porosity & oil show. rec 21' ss, locally oil stained in better porosity with no shows in tighter zones. rec225.6' gàiuconitic, pyritic calcareous ss w/scat thin beds of calcareous mudstone. Poor to fair porosity, no shows. rec 59' limestone wlocc zones of ss, sh, and dol. No porosity or shows. rec 37' oolitic limestone with 4' calc siltstone. Tight, no shows. rec 3' quartzite; dark gray to bilek, hard, no porosity. - - ,,-,,(:) r,\~ ij I Uï ~' j,,\~ j' I A r;t , " /~, - - ~\'~ ,~ : ,', t- ',u j'~ ,t'~i,',:'\ ~ ¡ .' t;, - t ' '< I f!.' ~ HOßIL OIL_COrU'OI:A1:IQ"r J>,,::,,"t\. t " -" ..V-ì b FORNAT!.ON TES'l:'_l:ŒPOK~ " SUì'~'IARY ~ELL NO: West Kuparuk 3-11-11 TEST NO: 1 DATE: 12/1/69 .' ARE~ : North Slope ZONE: Sad1e:rochit ~ ' TEST INTERVAL: 8969'/8970' . lINE BREAKDŒ\lN 1st FloH From 11:10 p.m. 12/1, to 11:14 p.m.- , Total IS1 From 11:14 p.m. to .1:13 a.m. f272'Total 2nd Flot., From 1 :13 a .m. to 9: 55 a. ffi. " Tota I .-FBI From 9:jj a.m. to 1:,)0 a.m. lL/3, Totéì.l ...,.------..------, 4 mins. 1 hrs.' 59 mins. 8 hrs. 42 mins. 15 hrs. 55mins. .- ]?e.$cription of Recovery .;. - , . ,1st F1m.¡ - Medium b10H in5 gal., ,bucket. Ga's surfaced after shut in 'at 11 :40 p.m. during blee? down. , . , -. 2nd FloH,~ Medium b10H through 24/64 bean'. 10 psi on surface gage' at 2:30 a.m. Fluid to s,urface at 5:30 a.m. Clean oil to surface at 6:00 a.m., [¡.OO psi 'veIl head. Turned to separatòr at 6:"15 'a om. but separator lines .frozen. Bypassed to pit, to thm.¡ separator. Turned to separator at 7:0'0 a.m. . Refer to attached Test Data 'Sheet for flow data. -, ~ottom Hole Pressures Device No. 'Clock Range pepth Inside 3637 48 ' 8898 .Inside 3636 ' 24 8902 Outside 2612 ~-- 48 8917 ----- Is t }'lo\.] Pe riod - ------ ~ 92, 31~5 . 4844 ' 365 -464.~- 352 L~38 6 ~40Ž--'- ,2nd Flo\ý Peri0d , -43'S-- '--ZI.)L~ --Z13S-6 l¡:2U------ z I01--- -- 430'9--- t¡:"6"t¡:~-- --- -' ..l- ,.Rcm.:1 rl~s : .. Reversed out est.. 85 bbls... gassy oil and 12 bbls. muddy ,-7ater. THO\,¡ater samples 6000 and 8000 ppm C1- Oil 28.20 API at 600 1\-10 quarts oil in bot tom hole chamber 2 . [t- % and 3. 2 % cut. . -,- - - . -~~" .",-~.""...."~~,..~-c~_.,-,, - ,,""" - ""~ - ~ r"""'C '1' , .' ' , ...:. ' , ,..;. \'~' . . . ,,~, -'.V\ " 'I ~ .. ~~ . ,--. }l., i - - ':: h'\ ~ " l ~ r ~ .,' ~,'\'~, l:~ ~ n~ 1!,J1 \ K '.' . t~ " ~ '1'~ "~1 \'>1 f1 (.\ /1 ~ b \!. ;~ '~'i '; -,' 0 ..J a \i il t, ~~ß ,:'~ ~ ,~..' -. " , , MOBIL OIL CORPORATÌON , FIELD TEST DATA 1 Well No. West Kuparuk -Production Test No.. \ ¡' I t Date I Totalizer Béan I Tbg. & Rema.,-ks Reading Size press .. Tir.:e . (b b 1 s) 64ths J (psig) ¡- I ¡ <) ./69 ! I j I ' I' I "I :' ~, f, for initial flow perij ad .' 11:10p~ Opened' tool --¡ in.. -I 11:14 t for initial t Closed tool shut 11:40 I Gas to surface during shut in iod. I pe t I I ./2/69 I ' I 1: 13A}1 Open tool for 2nd flow period. - - !, ¡ 5: 30 t Fluid s~rfaced' (Mud) , -I I 24 I 24 1300 I 24, j 425 .~ 0 I 24 '400 0 24 1350 I 6.1' 32 350 1 14.2 32 325 L 23.8 40 300 ~ 31..2 64 275 5:45 Oil cut mud , ! Oil-cleaning up I I Turned to', separator- ! I ! ,( 'ß ': 15 /" '\ 7:00 " 7:15 \ .7 ~\30 ! Changed' bean I ¡ 7: 45 1 8:00 ..¡ Changed bean I ' ' , . ¡ Changed bean ^ 8...: 1 C; ! ,- , , ! . , . ,Þ Perf'd. Interval Sadlerochit 8960'/8970' .. Zone l/~ , . Ii I' , ' I . Liquid ! Rate i '{B /D) ¡ I (\ Se arator Temp' Press (OF) ,(ps:.g) I I . . I Gas Chart Static Diff (psig) -I ~' ji j. I -L-J " !' 100" xl 1000 p,ji' Flang:;-' 4" run x l"p~ate Turned Ito separ tor - 1 I ; .. I 46 .. 140 155 I I 54 140 - 155 I I I' 59 140 155 62 160 175 64' 160 11:75 :' ~t, I 14 460 j \ 351 586 1 ,I 35',1 778 ',- 28 \ .' 922 20 \ 710 \ GOR (cu. it, . bbl. : ;J . . " " rg~.:r< ~n¡'. r... N~~ F.r.' N. 9' r'.- 'f}.!1If¡'!1 I . ß' ,.=. . f,\ . P. ~ l': H' H\ ü ~ 1'~ '¡'1U' g V, . ~in t~.. H f¡ [{' é.(I ,r rJ" !.w ~ \. . t\ ~ ~ ~'I \.¡ ~ }, f1.fJ ~, '!; V ~!' H Y' ~ '.. ~ .'''' â;. \i u ¡J L.7, ~~ u. .~ .'. ". . ."'" , Hell No. West kuparuk \ I Date &' ' .. Time 1 . " 1 ( .2/2/69 . ( r -- 8: 30AM I i '8:L~5 ¡ 8: 00 I '9:20 ¡Well die4 ....---+ I, 9 :30 .,\ 9;;--¡ Shu t 12/3/69 r Remarks' in for build up ,(~- 1 '(" 1:50AM Pulled packer , I i .~ . 1 I ' ¡ T 1 -¡ ¡ 1- . H, " MOBIL OIL CORPORATION Production' . ~est. No., FIELD TEST DATA 1 Perf'd. Interval Zone Separa tor r Temp I' Press 1 ("F) . (psig) I í 70 .54.4' ~ 100 I 70. . . I I l.n- I .( L . II I . I I t ' I i ¡ [ \ .' r Totalizer I Reading (bbls) t Î I j j 1 -Bean Size . 64ths Tbg. Press (psig) 64 . ¡ .250 =-l 225 ~oo Ii I I 67 ' 160' .\ I . 69 ¡ '165 38.8 45.3 51.1 . ,165 140 , , ! I 175 180 I 1180 t55 : 1 1 " 8960'/8970' ,;~ ¡ \ , Liquid Rate " '~B/D) J ì 730 1557 .' 11 :.' , \ 1211 1 1 ¡ GOR l~ j (cu. .b1: Gas Chart Static' fDiif (psig) ¡ ! I! '!;"" Ii 20 r 10 . j 624 L I 8 i t 1 0 1 .1 i ì 1 1 1 1 ¡-- I. . . . NOB IT,- OIL CgRPOI~ATæ~..../~ '(\-1\ U r f !' r ~~ l~ ~ ~ P FO[~[ATION TEST REPOK~' .; U j.\~ j3 I U. " Q~~~" '. fJ l~ ~ SUNNAJZ Y "~ , - ,c.' . - H.:s, Q !. Ü f¡"i L FELL NO: 3-11-11 ,TEST NO: 2 DA 1:§. : 12/4/69 þREA: North Slope ZONE: Sadlerochit (Shublik) , . 8880'/8900' 8914'/8924' ,TIt-IE BREAKDOHN 1st Flow From ' '8:30 aom. 12/4 to 8:35 a.m. Total ISI From 8:35 a.m. to 10:35 a.m. Total 2nd Flow From 10:35 a.m. to 4:40 p.m. Total :FSI rL-om 4:40 p.m. to 4:15 a.m. 12/5. Total 5 mins. 2 hrs. 6 hrs. 5 mins. 11 hrs. 35rnins. þescription of Recovery . ' . . , , 1st Flo'\v - Strong b10'¡;.¡ in. 5 gal..1;>ucket . ... - . . 2nd F1m.] -lvledium - strongblo\V' in bucket decreasing ~o medium bl0,., in 1 hr and 'then steadythrough6ut. Gas to surfa¿e in 4 hrs. . . . I ':. ~ottornHole Pressures Device No. Clock Range Depth . '1st Flo!;v Period . . lUP IFP .FFP FSIE' IFP . . .'-. - FFP , FSI1. . . FlIP. , , . TRs.T--TDO c: PT"UGÇ.,ED-- -- 2nd Flo\v Period ,- - ---.,---- ------ Re.!!1~ rks: , . -~ Perforations in tail pipe ~ggedo Ninor fluid entry. Reverßèd out oily mud. 0 ...:-"'- -, \. ), ""< ,MOB 1. L' or L ÇORl'O!~^T ION If ~'\\ f\ P ,,''''' rr r\, .". r.. ".1r:"i3I '",' , 't'o, rn,f, ,'\" '1'TO=-.I'['I.'5'1' o(.'POl"'~~'"", " . t1 Ð \''',,~1 ;'0 M N 1, r=,.~" : n, ß, ",",.1A. ,', ... ..~~~~~ .,c, .r-,;..U';' a.~. IV L ~ s.. t\ l ..... - ~ ~ ~r~;r¿l' . , . ~ELL NO: Hest . Kuparuk 3-11-11 TEST NO: 3 'DATE: 12/6/69 '~: North Slope ZONE: Sadlerochit (Shublik) TEST INTERVAL: 3880'/8900' 8914' /8924.' .TINE BREAKDOHN .' 1st Flot.] From IS1 From 2nd. Flo1;'] From ,10:30 a.m. 12/6 to 10:35 a.m. Total 5 mins. 10:35 a.m. to 12:40 p.m. ' Total .2 hrs. 5 mins. 12:40 p..m. to ,5 ;25 a.m 12/7 Total 16 hrs. 45 mins. 5:25 aom. 12/7 to 6:0'0 a.m. 12/8, Total 23 hrs. 25 mins. .'FSI FL-ÚlU ,.De.scription of Recover,.y . . . ' " . 1st Flow -, Strong blo\v in' 5 ga1~., bU,cket. ' .... 2nd F10\v - Gas fat surface \V'hen tool open~d. Mud to surf?ce at 1:20 p.m. 12/6/69 Oil to' surface at 1 :30 p.m. " . Turned to spearator at 1:45 p.m. on 24/64 Refer to "Test.Data Sheet for flm.] data Stron~ blo~'l. Oil ßravity 28.7° at ~O°F Cut 0.1% B. S.. Bottom Hole Pressures Device No. 2611 2612 Clock Range 48 48 ; Depth " 1st F I o'\v Per.iod IHP 4639 4646 IFP 4212 - 4253 , .FFP l~344 4352 FSIP 4376 4369 --- 2nd FIOt;v Period IFP ,3050 3095 40l~9 - 4022 FFP 4327 - - -"-. l¡,352 ----.-- . .fSIP -'------ - 4646 - FlIP 4639 . . . - .! . ~ . ¡, Rema rks: ~~ ..t. TEST NO GOOD - OIl; TOTALIZER HAS RECORDING INCORRECTLY ~-------:-- . "--::.;;..;-..,, -- . .' -/ . . .. , ' '0 ..,-'# . '. .". ..,.' .' . , .' .' . ' ' .' ' , , '. ¿ , , " '.,: " '''C'..' ''''0,... ~~~:~,~,t'F'J~~,' n."E'~ '~\rT I,A"I" .,.:':..;",',... "':" ,.' ~OBIL OIL CORPORATION.::.:, ,..' 'r~' . f. I, 11 t;¡J1 '~<~",;:,:1' , , . .. FIELD TEST DATA . " Iil . .. 1'.! LP .: tt. ~ 11 d ìj '" f~,.", . . . . , ..' Prod'-tctJ.on , .:~ Hell No"" , 'West'Kuparuk,' " :,' ~est No.. , " '\, 1\ ' I . .' .'. ': ::. I I I ,I , , , . . ,', . '. '. . , .' 3 8880'/892'4' Perf'd. Intervàl .. Zone Sadlerochi~ (Shublik), . , \' Da~e I' , &';. ',~ .', T i:r.e I , ' . I ( (2/6/6911 I ' ': 1'2 : 40 P1~ .,1: 20' I 1:30 I , Rem'c'rks Totalizer' Reading (eels) .. . ' . , f. Bean Tbg. ..- Separator Size, Press Temp I ~ Press . 64ths (p s ig) (OF), (p s ig) t I ' ' t . j , . .'1. II ' I d I I I, I I J= I 4l1F~anged r'unl 1" plate, !,' '16, I' : 16 ,,2-80 , 'Î . Gas Chart .Liqu~d IGOR Static' I Dif;.: Rate I, (cu. (psig) 1. I~B/D) I..bb I! I i 1 i I I j . ~ .1 : I I . I I I II ':' I. I 2030 l' ¡ 1760 'I, I I I I. I I I I I :15 I' Cut 0.2% BS 312.2 ¡ 16 1400 79 285 275 ! 16,,5 I, 2725 ! l I I i I I :15 I' I '..' 424.2 16 1400 80 290 275 17 '2688 . .. : 15 t. t ~ 539,,5 16 1390 79 ~ 290 .' 275 'I 17 2760 I. I . 1 ~15 I 645.7 . 16 I I I I, 1390. 78 I 280.' 275 ¡ 17 2550 \ i L I . ¡ I 1---; 90 I ,I : 1:5' ¡ 7'55 . 3 16 1390' 79 275 17.5 2630 I 1 I I t 8.5 6. 0 , 16 j 80 ': 2.90 275 j t : 15 ' 1390. ',I 16.5 ,2420 1 I, ,'. ,[, ¡ I ~ . . :30, Started Sampling ! ' Gas to surface, I I , I I . I Ga~ Meter! 100" x 100011 40.6 Mud to surface Oi 1. to surface' . 1 :45 i25.2 Turned to separator. ,,2: 15 , I' I 3:15 Cut 0 ,,2% BS '. f''''' '4: 15 ,¡ '1 198.5 ""-",'5 !(r 'Co / i,) 7 " 9 '10 10 , , , , , . . t .,' " '..' ,! . '. \,' . , , , . " ' .' "\', , " " ' I ",' . , .' 'j"I' '. ': ',\', '. " , , . \ I' .; I, . . I i6 f. 1390 270 15 I ,270 ..1165: " i9 " . , I, ¡' '. . " . , , , . t' 0 t'. , . , . " .>" I'; ,~':' I!. ',' . ,', . . , . " .~'#" . ill .' . ; .' 'f ,:. . . ! " '. : ',' , , " . . t . ':.' '. " . . , . ' '. . " '. , " ,. " " ",", ~,' ' L . ", ','. . , . ' ': ", ,'C" ,1\,': ~"r" r" H, ~r,','" a', ',' " ',:', . '. ,", .'~,..',', '.','. MOBIL OIL CORPORATION, ':, " ",' ',,' "'.' !UNtHJt NJIA L,"':'",' ", . 'FIELD TEST DATA' : ':,>..,:..', " ", . 11. IØJI. , 'Production, ", - ' '," Hell No.""West Kúparuk .: ',,' '..J;est No., 3 . " : ",Perf1d. Intervál .... "," , ' , ' . . ' < '.. jl' . , " "Date I ' ' . <:' . , .', "... T ~me '\ " " . I " " " I ( 12/6/69¡' (,' ! , ,11/18PH\ " I ':12/7/691 I . 0.:18AM I I '. I ;. '1: 18 . l " . I ":2 -18 ~ \, '.. '. ¡ ¡ f 1 ¡ , . 1 I " I 'I ' 'Î ' I, . ~ 3:20 4:20 (?:20 ,:J : 25 . , '. ,.', , .' ." ¡ . Remarks' I , I Totalizer I' Reading (:bb ~s) ¡ ¡ Cut 1% BS '\ '932 .2 'Cut 002% ;SS Flo'\v' er~tic' I . 1199.4 , 104307 Cut 001% BS . 132800 ' 'l' í452 I I 2nd Set samples ~ F10w eratic ,L 155603 I 1673~0 Closed tool ,for final shut-in. I ¡ I I ' r r .[ , ' . .'. . " ~. . '. ',' '.', , ,..',' ~'" ',' . : :', .'. ", . ',' '. I . '.'. .,,,,,,' ,, : "" ~ " j .,., t' " ' ,..' . ; ';,,;. ,'.' " ; ."'..' " " " " Bean Tbg. Size, Press, . 64ths (psig) I I 1'16 ., : 1350: I I I I 16 I 1350 16 I 1350 16 1350 16 1 1350 16' 1350 16 . 1350 I I I J I' , 'I , -L , I: " I . . ' .~ 888ål18924J 2/2 . Sadlerochit (Shublik) , Zone Se arG~Gas Chart Ter.1'O . Press ,Static! DiEi (OF) ,(psig) I (psig) I 1 ¡ ; I 290 . ];9 275 . I; 275 I '275 I: 275 r. I J I ¡ 79 290 79 I I I : I ! r. .~, '.1'. 290 " , " , I' " " . ' ,~ ,',: .': ,;",',' II , , I :. ' I '...' 270 ' , 275 . , . ,,' .t , I' f ¡ 1'6 1 : ! 117.5 I 2675 I 18 118 118 .' I 2880 118 ' 18 . " Irl rl I 1\ I..". \,. .. . . . ',',' . , " . Liqùi,d Rate '~B/D) t , 1 1 1745 I 3740 . 3085 2505 .2801 " , . GOR (cu. ,1:>1 . ¡ I \" I ' ) I : i I I I I j' I "1 I =- I I t ¡ . ' i f I ! . :." h{«'U ~n t!... e R ~ rn [~j: I 1,.'o."'rT. ,.,~.. "'''''''-'''''''''['IO''~ ... N"%1 ", fi ~ ß ~~ &t ~.!!_~J. L I,~J51' uJ5~_~ ,""" '...l __111, U ~,~ -.:.v n.::s 11 FORNATION TEST REPOl~T '" - - SUNNARY I F1 ~ i J;~ ~\ L . ~ . . . ~ELl. NO: !vest Kuparuk 3-11-11 TEST NO: 4 ~~: l2/9/6~ ,AREA: North 'Slope ZONE: Sadlero~hit (Shublik) I I TEST INTERVAL: 8880'/8900' 8914' /892L~' .' ..: ~-,,~~,,~~,,",...,.:~~'--'---_""---o . TINE BREAKDOHN 1st Flow From 6:25 p.~~ 12/9 1S1' From 6 :30 p.m.' 2nd Flow From 8:30 p.m. .'FSI From 2:40 p.m. 12/10 to 6:30 p.m. Total 5 mins. to' 8:30 p.m. 'Total 2 hrs. to 2:40 p.m. 12/10Tota1 18 hrs. 10 mins. . 1'\ ~ 1"\ ^ .- .-, , 2 " , rn . 1 ") ') 1.. .- - 20m i n 8 . 1:0_- ~_.~:'_Y_.H~.__:'-__I J..!- i0LéiJ..__~~-:~-_._.- . ' ]escription of.Recovery ., 1st Flow Medium blow in 5 gal. bucket. " 2nd F1o~.¡ - ,Strong blow in buck~{'.', Gas t'~ surface in 3mins. Turned to burn pit. 'through 24/64 choke. :Hud to sui-face a,t 9:03 p.in.~ Choke plugged at 9:15 p.m. , Opened .to 32/64 at 9:20 p.m. . Oil to surface at 9:25 p.m. Shut in at the surface t~ relight flare., Re-opened to burn pit'at 9:30 p.m. Well head pressure 650.psi. I I. I I I Refer to :Field Test Data Sheet for f10v1 data. Bottom Hole Pressures , .- , . - Device No. 3636 3637 2611 Clock Range 24 48 ._.~§- !>epth 8841} 8 ~ L~ 5 881~8 :, Is t Flo\.] Period IHP L~642' 4671- '--4688, IFP l71L~ 3131 2L~6i--- . FFP ~08__- '3304. 3836-~ '--.. Fsn 1~349 4325 1~34,L~ -- - - ,-L--~------"-- -~- 21¡l¡ß- 2nd Flo\-J Perfod IFP 1732 1803 3363 - -- 3296 33!i5-'- .-- FFP - 4325 4376- FSn - Fl-œ.. - -4~688-'~ --l~S-S--- --- -- ---,.... 0" E-em3 1'ks : , . Oil Gravity 27.4 at 60°F ..~-.,....'" ... '-, . .' ..-:..'1 . , " , ' , , " ~ -C~'.O;u'M ~,In FH liA l: :':, '. ';' ,'>t". ~ ~ ~ ü~' b ã\l 1;,' ~1:~t ~," :/' . "\ .' , . Well No. " , . , , West .Kùparuk , , \' Date I' . & 'I" ..., Time ¡ ,', . , ' ,,', .' ¡ " (' 19/691 ('v i , 6: 25PM 1 Open on init~al flow ,', 6: 30. ' ¡, Closed for 181 8:30 I Open on final flow ¡ .' 8: 33, ¡ Gas to surface . '., . ! " , t .:. i , , . , , /, .,,' , ',MOBIL OIL CORPOR.L\TION .: " " . , , .þ' 3880,' /8890 ' 8914' /8924" ,Zone ,Sadlerochit (Shublik) . 1/3 " " '. Production' . ':¡;est No., . ' , . Perfl d. Intervål .'- Totalizer :leading Cùb~s) I L '\ " j I- . j 1 . . .. '. '. '. FIELD TEST DATA 4 . . , " Remarks "'9 9 9 ,( ¡O I( 10 10 ,~ 10 ,11 11 , ' . . '. ',. : ,'.., ",: ":'" /,' ~ ,,' . '.:,', ' I',. ,. , , . " t, ~': ," ~', .,~ . , . , '.~, ,,' .':. t t ~,' .. ,'" . " I ,. , ' . ' " , ' " " I ; , 'I " " ~ ~ '1 I . ,'. t, ..' . . I ' 1 ' I, I 'I ' Bean Size. , 64ths ¡ I I .'\: I I I 30 .' , . , f.' Tbg. ' j' _: SeEarator Press Temp I' Press (psig). (OF) (psig) ,I t . I I' :,L' I U 'L I' I I I I : ~ I' . ! ! .: Gas Chart 'Static' j Difi (psig) ,I , j ~ I i I' I. f I , I , . Liqui,d ' ' GOR ' ~ate , I (cu~ : t~B/D) 't" .bb, 1 !. , I j' I ! ¡ I I I i I ¡ :\ ,r; r ! I ' '\ I 1- :03 Mud to surface . j ! :25 ! Oil to surface', I I I \. ¡ I .' I ¡ ! I " I . I I ¡ :30 Cleaning up to burn pit 32 . 650 ' ¡ , 1 :00 TUrned to separator I 0 I 32 I ¡ I I 1 1 .1 I ¡ ; I :10 ¡ .. 13.7 32 ¡ 80 . 385 400 18 I '1973 20 .. :15 I' ,; ,r 22.1 32 I 80 ~ 415 I' '430' , 34 I 2122 '\ 27 1 ' ! " ~ . I ':3,0 I i, ¡ 4405, 32 ¡ 80 405 I 420 34> I 2136 ¡ 27 , I ! I : I :45 67.2 3.2 ' I 80 385 I 400. ~t I 2179 25 , , ! 1 I Î I I I r , 40 ¡ :00 9001 '32 700 .. 80 .385 400 2162 28 . , , . ¡ . , \ I ! ' I , 'L138.0 44, :' ... :30 32 '82 395 410 2304 \ '. 2E I \ I , 1'- 't. " . . " , ., , I 'f , : ,f." I . ¡-': 't" , . ,.1 , ,', ',' , . I . ""j 'f ,', \. " . . . , . , , . I , " , . .~ . . ~ . , .' : " . , . '. , " '. '. ' . , .' ' ,'. . :', . , ' .' L " ' ' ':: '~~'-n" -, '~-" :r'l.f ~. fF" ,'~, . ":,,. :,;,':',,: ':,", " ". ~OBIL OIL CORPORATION.',:, ,.' ":' l fl !J./~f~'? "r¡:¡~ Ü .",4"'\'l'!.r;:.~ l.~¡;\",'.~ ~.: ~",'!" A F' ," '.::'.. ' ' . .' ',. . 'FIELD TEST DATA " ,'. ' " ::','.'~ ' . . , ~~. J'J\.t. L! .t.:;. -'~..' .!1d""'! .-:: . .' .'. . . " <-.~. ;,: '.!. " '. . 'ProductJ.on " ' ' ""~ ,1~ell ~o." West Kup'ar'..lk ," .', 'J;~st' No.. 4.;, , ,i)erf'd. Intervàl " \' Date ì & '1 " 'T". T: .' .. l.me ì '.', .. " i' CO 12/9/691 t. 12 \ 12 12 , . . ¡ .~, ,0: lOAM! I I :'0:30.. i. 1:00 j ! , '2: 00 ¡ i.' 3: 00 41.' ( r~OO ,,4:30 I' ,\.' ! "."~'~O I .5: 30 ¡ , 5 ;45, Î ¡ ,6:00 L. ". 88~O't8890' 8914.'/8924' '.2/3 , , .. Sadlerochit (Shublik) . Zone'" I' , " Li~uid GOR . .. Rate (cu. '~B/D)' .bb 1 ': j, 'L I . ¡ , I ,. 2 I r r-- 1 I I' . " i' , ~~ot'ali~er ! ' Bean Reading Size. (bbls) . 64ths Gas Chart Static' Diff (psig) ¡ ..j ¡ '.', " .' ! :. . I \ I . , I :OOMiànite ! ¡ ¡ ! ¡ I ¡ I I " , I: 50 I :'00 1/2% B.So ¡ I I 1 50%; Mud Emulsion 18609 3,2 800 82 ¡ .385 ' 400 , I j I I I I I I /10/6~ I ! Tbg. Se arator Press Temp' P~ess (psi g). (OF) .(psig) i ¡ j ¡ Remarks . I ;., I Well Shut-in at the, surface' for 2 minuteso ,I I I 2352. I I .j I I" 48 " I 2309 I ¡ , .[ I: . . lioBoS.) 1% water, 59% emulsion " ! , . '32 t I I. 28301 . 32 820 ..,3,60 375 t 38201 32. ~ 850 360 370 55. T 49109 32 94 360 385 65 132 ,I . I ' 60307 880 94 . 360 l' 375 63' 1 i 660.4 32 I 880 , j ! ¡ ':~ 718.0 32 880 95 365' 380 65 I / 773. 8 ' 'I 880 95 365 380' t 796..0, .' t 95 . 360 1 950 95 360 1.2% B.So, 40% mud emulsion l%BoS. 22% mud emulsion, . f 004% BS;, 1670 emulsion Oo4%BS. 7% emulsion Changed bean size . . ~ . . . " . , .r . '. . . " '.". . . ..t '. "..- , . .' . ,'. ""',,;' ,,": ',.' ' \, I ", II . ,. \ : . " I ~ '~I!' t : I J! ¡ . '. j', '~.. ~. , , " .,' t,:" : : .. I ¡ i ì 'i,it', I , i , , , , " . " " II t: " ¡ 2376 , 2395 '2683 2722 1 2736 I I I 2184 ,~ I I ~.\ .., ~ " } 2 3 3 2 2 2 3 .3 t . t . .. 't. "I. " . ..~" '"'''' ' .' " i ' r''r; .:,:,' , .' " ;"" ,'" "" ' "" .',"" ,.' ': '..' ," l. , ",':';"" , ' ,':' I~':n- ~:~,:,"~,N, :r):,J,': U" ~,'\, r ~."',#,, T Ii :4," ¡j.: '. ':,.. .. ... :-OBIL OIL CORPORATION .:. ... '.. ~ u. r~Jn~ ~! ñ'J it", n~)1 .~ .8A ~' .'. ;:,:', , : " "l?IELD TEST DATA' '.', ':" \i '!Íoi ~::ß ~ g VJ '~' F ,.' . "... ' , '. . , ' . ':' , \:Î'" " ,'. " Production' ',' " , Hell No'" West Kuparuk . '. ~est No., 4' " . p'erf' d. . " ! , ' , ~ 3/: '. .. . . ,_. .- Interval 8880.' /8890' 8914' /8924 t' , ' 'Zone Sadlerochit (Shubli~) , .' '. ' i , " . '. r , , Date t , ' . , ~ \ ':~. Time ¡ (' ':-¡- : .. Re;.1.::¡,rl,s ¡Totalizer r.. Bean !, t. Reading I Size, (bbls) . 64ths " ,I ' . , . Tbg. Press (p s ig) . Separator Te,mp I' Press (OF), .(psig) t , .' . ¡", ,j' Gas Chart' _I. Liqui.d !, GOR J... ...8' -1:" 1) +- S¡,.a..J..C! D:l.~J: ,...'\.a~e j (cu. (psig) I 1 '~B/D);I ,bb I I' , . , . 10/691 I \ ì i ", I . I ¡ I .. ' ¡ / 1'26 ' . ,'\ :1000~ 1\ 95 'I ¡ 155 ! 0&"1 1 004% BS, 2% e,mu1sion '\ 92104 365 380 ; 2448 ,! 28 I ! I I I I, ! ' ! . , ¡ \'55 0 .' t 97307 26 1000 ' 95, 365 380 2510 ' . ! : . , ¡ 27 \ I I I I . I 0, Oo4%BS, 20% emulsion 1 1027.5 26 1025 92 365 380 56 2582 27 ' j 1 I I '\ I ! .. \ ¡- 0 . II ,4% II, 1134.3 26 1025 92 365' 380 ' ¡ 59 2563 27 .1 ,I I. ge j 161 I - : 00 . II 0% " 124108 26 1050 365 380 2580 28 . . ¡ 1 I '1 164 I I :00 II 18% II' 1345.1 26 1050 92 ,360 375 I 2479 I' 30 . ¡ ì :~ I " ! .1 ! 66 I "\ " 0% " 144207 26 . 90 '¡ 360 375 2342 32 . , ¡ I 1490 Q 6 26 I I '30PH ¡ ,2270 I .1 . '1'1000 ' ¡ . :00 ¡. " "0% " .. ..1537'04, 26 t 90 3.55 370 6S 2270 34 I 1 .~ 1 ,: 40' \. I off. cliart. , Un1~le for I samp~ing 01 Sh~t- in,. Rate had diopped to 10pa B/D and gcs to; ... tabi1ize cut and r te \.- 1 I , ,' /1'<-/691 I I .' t I ¡ ' ' S1 perio~ I ' ¡ I ' I :OQ ¡ .Pulled packer' -- end of I .¡ [ f . r I' I ! ¡ . 1. I, .. ,t' I /,' ¡ i . . I . . I ; ^ ' . 7: 0 ': 7: 3 , 8: 0 , 9: 0 ~,: 10 .11 12 , l''-~ :<-- ' ~. ~ ", ':'f , 1 ..2 .~2, ...,2 ': ' .' :' '¡ . ,'!. '~I '. . I~..,.'~'~':.I.':". >t . , .' "".,0' ," :.;, , ',,',.':; --¡..--. ._- " . , " ! ',' . I',. p. I. . . ~' I r: " . ° , . f " . ". III .' .. . . ,"t . . . ~'~~ . i.:~~.'~ " ,': '"" p , , I"~ '. ; .t , . ' ,f .', , , , . Itt! - , ' . 'j " " , '[... n ,t\ ~ tr- s D" ~- r.\ ~' -r 8 , ,~ lj .' ", " ' " , J;.\' ~~ ~J 1'1 ~ !:\,\' , ~ ,-, ,~ 'UOTlIT f'\Tf rf'\r""O[)^'l'IOl"I'"'~' .... . ~.~ ~~ Ð i . it" I¡\.~N M. Y\ ; , !!-2!-~~~~Y_~~--=--~ \4 \;I, 11 '1 B I L b a ;¡ I it rí b Fon\l"'I'IO\! 'j'l"S'I' REPOi"I' .. -~ -'~" --- :'_. '" - 1\1 t\- . J..1 . -~~~~- _.. --".",. --_. '- '-.--. " Sill fHA I-~ ~'¡E L L NO: We st. Ku pa ru k 3 -11- 11 ,AREA: North Slope ZONE: TEST NO: --- DATE: 12/12/69 5 Jurassic .TEST INTERVAL: 8770'/8805' TINE BREAKDŒ.TN 1st F1o~ From 00:35 a.m. ISI From 00:40 a.m. 2nd Flow From 2:45 a.m. .'PSI Frvln 8 :48 a.m. 12/12 t°-DJL~.-JIl. to 2:45 a.m. to 8 :48 a.m. to 8:45 p.m. Tot-al 5 mins. To ta I_Lhr.ß..a---ÍJ:!lÍI1_L. Total '6 hrs. 3 m:i.ns. , Iota 1 11 hrs. 3ï nrLns. ..De.scription of Recovery 1st F1o'\v - Strong blaH in 5 gal. bucket. . 2nd Flo'\-7 -. StrongbloH in 5 gal. bucket . Gas to sur:fa~e in 3 1/2 .mins. Turned. to burn p.it through 20/64th bean. Hell head pressure 35 psi. Had \<78ak bloH through \ 27 /8ft. ~lar.e line throughçut'the flo,\'7 period. Hell head pre'ssure stabilized at I 15 psi~ last 3 hrs. ' ,- Bottom Hole Pressures Device No. Clock Range pep th Is t Flo\.} Period 2nd Flo,\.l Peri.~.d p.em:1 rks : ',' - - -..-- 2, 15_-- 62¿~ ¿ 200 4349 182 284' 43f~9 462fl- --..-- - ., ' Reversed out and had no fluid entry except small amount of distillate type oil. . '/ ." , l r~~ _0"".' Th: Ji.,rF ~ ,~.' r ~ 'R"T' .I"~ ':1. :', ".' . ' , ,'MOBIL OIL CORPORATION, " ,~. -,', .Íì, ~~h"~, h ~3~\~.¡ ,~I,;' . .' . . .V ~I bi, \1 ìt tl t# ìka ß \1',ti . U' a ~... . FIELD TEST DATA . . ~ -- ...; :.'."", ,,"Production . ". : .Well 1'1'0'-" West I(uparLk ' '. '."Çest l'~o., I" .' .' Tota:lizer Bean r Tbg. Separator "Gas Chart . .L:Lqui:d 'I' GOR ¡)ate 1 . ' -! \ & .. Remarks Reading Size', Press Temp Press Static D'.c.:: Rate I (cu. ft. I ¡ I J...... Ti:r;.e 1 . 1 (bb 1s) I . 64ths (psig) (OF) . (PSig) ! (p s ig) I ¡~B/D) ¡ .bbl.) I I i r . .' ( I;] ,'~ ¡ 2: '.)JAH J r I 2: 40, I , I 2: 45, ! ... ¡ 2: 49. ¡ I . ¡ 8.: 48~.:1 , $: 45PM I 1.... (~ .\ \ ' .. ~ ., .~,'I .. .1' , ~.. . , ' . 1/1 .. " I , .' , '.', ";. I .' , ~ ..' .' '. .~ ~' 5 ,Perf'd. Intervai 8770' /8805 I , , ' Jurassic ,. Zone Open on Initial F10w ' ¡ ¡ . . ¡ I " I I I. I 1':1. J . '1: ! \ ~..J'. I . I n l. .1 I I I Weak ~as ~lowto turn pi~ 4hrOUgholt No liqUid,1 f'1ow to j the surf-ceo.' ¡ , .' i "'.: '11" '. '. I ! ' " I " , '1' j Closed for ISI i! I j " I . 1 j ¡: -I I ¡¡ ,I I: I I . . . 1 I I I I j ! flo~¡] Pt~iodo I . /;, ¡ I I, .j I 1 1 ¡ , \' I ! I I 'I 1 I . I I ; 1 I ¡ I I ¡ , ,'I' j I!, I' i I 1 \ ;0 I \ \ " " ,. " I'. , . ,It /, I, . , ', ' ," I ,' ", 't': " Open on Final flow, Gas to 8urfaceo 8hut~in for final. 81 Pulled packer" , I . ,! I I , j ,. . i r ' i ! t ¡ I " , I I I i . .\ I j ¡ .I~. . . , ¡ I~ . . , . , , .' . '. , , . ... ""., ; ". , , :.", ".,,'; t",',., ,,' ' ," ,',: . ¡,' :.',' to. ' .. ':' ~ . ,. . , . '. , . ,'" ' . " , ~ '. ~.,' .' . . . f "', "I.,' " f, '. . I'" t.! ' fL! U. ",',\', ' .. ..;~ .., ~ I' , ',. , ! J'¡ . ¡. f ¡' . . . ''''.' ", ! I' 'I " ' , r-'~'''''O-' . A' fr¡ ~ F f\~" !1ì" '" ," '" !1°BIL OIL CORP08~fIO~ "', ¡ï~~.:orJ , fJ J) ç~ U~: (1 ~ tà ' FOR~[¡\TlON TEST IŒPO!èT .~ -" ß J j . . U l j ... , '.tl , . .~UNl"¡ARY . '. fJ Ii &. . :. , . - . ¡<TELL NO: West Kuparuk 3-11-11 TEST NO: 6 DATE: 12/23/70 'AREA: -----=- North Slope ZONE: Kuparuk River (Cretaceous) TEST INTERVAL: 6570'/6604' .TINE BREAKDŒ.IN 1st Floç,¡ From 10:10 a.m 12/23 to 10:17 a.m. Total 7 mins. IS! From 10:17 a.m. to 12:17 p.m. Total 2 hrs. "2nd Flot;.¡ From--YZ:17 p. rn. to 10:35 p.m. Total 10 hrs. 1~ minso ''''''~T' Fr:)ú; 10:35 p.rn.. ..... - 1:35 p.m. 1'2. 72l¡>- ¿. -, 1,) hrs j: . 1:... ~ . L\.; . . \} \... (:1 J. ~Bscription of Recovery . ' 1st Flm.¡ - ,Strong blmv in 5 gaì;' 'þuèket. 2nd F10\v ~ Refer' to attached Field Test Data Sheet. NOTE: Oil totalizer ma1£ùnction or gas carryover in.oi1 measurement during £10'\-7. .TEST NO GOOD Bottom Hole Pressures , - . ¡ , ~ . j ~, Device No. tQ37 . 2611 t 2612--- Clock Range 48' 48 --_-5~-- Depth 6479 6502 . 6506 , , 1st F1oç.¡ Period IHP 3581' 3509 3 5~L-- IFP ,1201 1304 127ð .FFP . : ----- FSIP 3252 3313 3311 --- 1544 ,- 1630 1669 2nd FIoH Pe r 1. rid IFP 27 3L~ ------ 2772 . --2'nfï-- - FFP 3268 - 3394 3129-~ FS 1Ft Fl-U" 3512 3509 --~l¡.95-- -.---- . . ,}< Rcm~:t r~~: 'Max. BoHoT. 150°F " 0'.0.- . -..:~ -... ~ / '-.'- . ..~ 'I . . '\ , , r n~ t\u "1'" ~ r t\~~"T' r ..!'~ ø ~ ' b.. . « !J ~\~ rF if ~ JJ 'rj~ l¡~: 'f .~~ u ",::, . v VI ~ YJ ~ m ~J, fb u . ~ !~' ,þ~~ ã. ' " . f '. ... u. 1:1 i. .".A/V . , Hell No.' 'West Kuparuk 'Production' , Test No.. MOBIL OIL CORPORATION . FIELD TE ST DATA 6 . . \ ¡. . RerüJ.rks 12:55 Opened at surfice 12:57 Cf 'p7 ¡Nud to surface Surface chokeplugged went 1 . Flol<ing oil cut mud to burn pit IDisc6vered pressure gage frozen . ¡ , ICleanuþ to burn pft' ¡0~6;o B.So I ¡ , I¡Urned to sepa~ator. ! - , 't to 16/f4 and. back' 0 20/64 ,j- ¡- e j ¡ I r,. Separator.o~let frozen 1:30 1 :,45 " , \ 2.: O'q 2: 15 ,2:30, . '2 :45 Totalizer Reading (b b 1 s ) i r Bean Size, '64ths I I , I I 20. 20 /. Tbg. ' 1 Press (psig) t . " I :' . I I 1 16 400 . 400 20 , 'I' 250 20 20 20 ¡ f. 20 ! 775 775 . 775' 775' . . I . '. ..Þ '. 6570 I / 6604 I . Perf'd. Interval , . Zone Se arator Temp' Press (OF) . (p sig) , , : " l/~ Cretaceous Gas Chart Static Diff (psig) I . t ' Da te I' &. .j :' Time I (/ /23/691 ¡ 10:OOAM ¡Open on initial flow ~O:17 ¡Closed for ~nitial SI . .' I . . .' . ,~2:17PM ¡Open on Final Flów ,,12': 25, ,i Gas to surface ,,12 : 35" IShu t~ in' a t the surface to / hal< f r zen fl DIN li) e' 1- , ' r I \ , \ \ " . ' f . , Liqui.d Rate '~B/D) ¡" , .,:~ " GOR (cu. j ,be] . I' , .' t " ..., , ': .\ ~ ' , .' , , , . :" ' '~n: '. '~~'~'U'~ r~~~' T:~' ~':ft" ,',>'.,: !, ~, ',~) f,\",f.'," R":-r.,~" ì~ .ti",V::j=~;~.;\~:~ '.~' ~ ,Q\,~..:,:', ,'," ~1 ' . ~ ~ .'" IJ l1 q':1'~ fi \J ~ l1 ¡;...,.. r! . " ,. ..' ~~ y }J \~".~, td~' 1:k, ."...! ',iJ \ ~ . ":.' :, Production , . 'J;es': No., " , .' .. .' .' ! , . .-, . , . " , . ¿ . ,', ' . MOBIL OIL CORPORATION .: -: ' ' , . . . .. .' . FIELD TEST DATA . Well No." . Vlest Kuparuk 6 'Perf'd. Intervål 6570"/66041 , . '. . . . ' '7 ....one 'Cretaceous \ ,:,' I' . Date I & . " '".Time I ' .: , I ('-of 23/ 6J (, " ,8 Remarks '. I Totalizer I Reading (b b 1 s ) I j- . , :, I ! I ¡ rLiqUid l GOR . Ra t e - . I ( cu. '~B/D) 1 .bb 1 I ' I i . Bean I' Size, I . 64ths I I Tbg. Press (psig) , I i , S e p ~'r a ':.91:... Terot> ' P::ess (OF) ,(psig) I I Gas, Chart Static' Diff (psig) 9 - ..1 I 2Q '.,' " ! :800 ~ II ¡ 146' I t ¡ : OOPI1 ¡ '3370'6 75 115 130 4061 ,I 2: ¡ . ' ¡ I I, I I i I ' 1 ¡ : 30, ¡ Started sepa't"atot sampling 42109 2.0 800 , 75 115 , 130 ,48 4046 1 . 2: 1 i t '1 I I ¡ - :00 50602 20 8'00 75 115 130 , 52 4046 I 2~ ,', ¡ '1 .1 I '1 ' 1,50 ¡ ' :30 Separator heater went .out .59000 20 800 68 1.15 .130 4922 2l . . -, I I 1 .1 : I :00 \ 674.3 ,20 800 92 115 130 45 4046 2: ! .' , . : I / I 56 : '1' 45 . I' :30 758.3 20 800 1.15 130 4032 2: .' , .' ,. I L I , .1 " ; . , ! I :35 I Shut-in for finål sr ':1 ¡ 1 1 24/651 I ,,', I I I I I . 35:t ¡. Pulled p.acker loose. E 1;1g of sri f I I Ii. i . ..~," .-.~ I . . f . I tt\1r~ine 'me te r '0 '. ¡ ¡ ¡ NOTE: ,I Rate too high -- G~R.too¡low. Gas ev¡' dently going thr< Jugh Data tiro Good -, ~ .\ I I j ! " . \ ¡ t I, L ' I I I I ¡ , ; ,¡ 1 , I t l " 1 I I . ¡ I 1 ' 1-', ,~ . . ~ ' :' ¡' . . 1- . ' I, ...-..-.~....-......ì .' 8 ,.',9 "10 \ ,: " . , '10 'r~)O iff 1: ]. '. . . :, . . . .: .# , . , . . . . " , , '. ."'''.,', . . .' .' , ",. ~ ' .'. .' ': .( < , 0' " . " . :' , , ' . '" "". . ~.. ! d ' ~ ~' ', . , . ! ' 1 '.' " ~ I ¡ I": ,: ~. I . ! t, ¡ " ;' I, . i ' , , " ' '1. . . '1 'I ',', .' . . . , '. , ' , , . . o. ..' "::~' (1)Ä~Jr~.ñ\[MT.~ (~. ,',...' . l".., yUr~ [i v.tN.I~,AL:.;::,..... . 0 ,MOBIL OIL CORPORATION. ' 0 FIELD TEST DATA 6 . . -, ' ',' West Kuparuk . '.o~.Hell No.' , ", ' , . Production' 0 ~est~ No., , . 0 ' 'I (' , 1],/23/691 ~ ¡ ,. 3: OOPM ¡ I I I I I, 20 .. I 20 .1.20 : "775 : I ¡ 790 I 800 J I' LI 1 : I " ¡ . I T~Jned to ~r- I I r- . I I '3: 15 . ' " " 3,: 30 II II '3: \, ", 4:. '4- (~ >~ "/14,: '(' --1. ,5: 00 i . ". j "I j 1 I 800 ' I I ¡ I II . 'II II II "II II " I 1,1 II II II II III i LO~ver' separator pre s so. 0 20 . Gas breaking'out ,.¡ , . .]:00' ¡. Filling sample 'barrels 1 : 30. .1. 8405 20 800 . 75 800 r 75 , 75 ,20 I 16707 .. [253.0 20 . " . .' . .,'" " .. ~ . .. .~. : " ., '. <' I' ~ .' ; , :,".,o' :.'/'" .... " ,'0"'", . '. '(II' " , , ';, ': ,t '0 :', .,' . I ! t;' . : ~ ' '''' ~ " ;! "'.1 ' " :'° , , I,' .1: t .' -, . 74 . '. . . ! . . .~ . . 'Perf'd. Interval . Zone I ' 110' 110 ',110 110 , . '. ' .,i '. , 6570' 16604', ,2/3. Cretaceous " , I se~arator I : I ¡ : ¡ 1 ' ~ j: I I' I' Date I Totalizer Bean Tbg. Sep~ratE.E- Gas Chart . Liqui.d GOP. .. ..- 1 \ & 'I .. Remarks Reaàing Size, I Press Terr.p Press ¡ Static Difi Rate (cu. j Tir.:e ' ('obIs) , 64ths ¡ (psig) (OF) , (psig) (psig) t '.(B ID) ,bbJ . " I 1 ¡ 1 1 1. , I, I , I I I - \.' I' ¡ ¡ , ,I I t~~ 45' 1 II II 20 800 . , I I I - I I ¡-- DO '. I " II 20 800 €l6 180 1 ¡ seþara t~r.1 I : I I' I Could not get gas to break out Work on .' I ',' ! 45001 BiD~ ¡ , ttrbine :~ I ¡ 30 " " II II II II II 1 Rate C¡hecking eter ,¡ , I ' L 4t~r o. 11. . I I ¡ 1,1 II II " " II II ¡ 45 Turbine , I j . . ., 0 '\ ¡ 125 " . . , ' . I 't! ;tt t I I I I I . I ,;" 5:\2' tit ¡: 054 '. I 4056 3994 4094 ,~ ¡ " , , " ' oj ! I ! I I I . ¡ I f 1 ' 2~ 2~ ..to. .24 , . '. ' . ' ,. " , ' fa Pt, i'i'; ".' " ,,' " t:\ If'" ,'~ ~ " l.>'~ ~ .. -,'," , ',',"'"',r"'-",,,' , i,', . "..' MOBIL OIL CORPOlù\TIO~_, " " ~,",\\.I ~= ,I, n, 11 D," M,I t{ if",,'''~, ~ >. ~..,~~/" FORNATI9N TEST REPOR'f ]~,~~ AJ1. B_- ~ ,L l~' j ~ .:...c~\ ~ '. , "",,",.,<,,' . "" "S{JH¡\1AR'f ' , " ,,"':' , . ' ' Q J¡ ¡ &,.. 3-11...11 TEST NO: 7 DATE: 12/27/69 . . AREA: North Slope ZONE: Kuparuk River (Cre~acéous) 'TEST INTERVAL: 6570/6604 TIHE BREAKDOHN . 1st F1m., IS1' , 2nd PI 01;-1 , ,'FSI i ! i From '2:35 AM 12/27 From 2 :40 AN From 4 :l~O AM From 11: 10 AH to 2 :L~O .AH to 4:L~0 AN to 11: 10 AN to 8:55 PH Total 5 min. Total 2 hours, Total 6 hours 30 min. Total 9 hours 45 min. ".. ' " pe~cFtption of Recovery 1st F10~ I Strong blow in 5 gal. bucket. Gas to surf~ce@,2:41 AM. - 2nd Fío\v Mud to surface 5:05 AN Oil to surface 5~10 AM Cu.t 002% B. S. ' 6il gravity 24.4° API @ 60°F .Refer to attached Field Test Data Sneet r " , ! I Bottòrn Hole Pressures .1 Device No. 3637. L}8 - Clock Range , hr. 3 - Depth . 6507 1st F 10\-1 Period I lIP 3408 - , ,IFP 926 FFP -- FSIP 3269 , ì ..: - 2nd F 1 0\-1 Period IFP 1201 FFP 2200 .' FSIP 3269 E -..- FIŒ 3373 - --- , .... Remarks: ' -' ~~, . , . ...~';'" ~.... ", ... " ->C ..', ;r I . ~ . , , ' '. .'. ' : ..'. , ~r ~nu~. .:,~.y r.}~ J r\ t. MT I...' A 1..".'.' . Yo - J ~ \1 'i .j ~ Ij í.1 ;,í~, t :: ',' ' ':; : ' , 'V'....,~'~ ~ ~ ~¡,# ?" !! \j " ..,:: ; '~'Ji.l ' 1;; ell No. " \ '. ¡' Da te- ! & .! , T':""e I '( ~,.. I . ~ '7/691 " ¡ 2.: 35AN ¡ 2. :40 I 2:41 I I 4:40 ¡ 5 : 05" I I I 5: 10 i (t5 it 6 MOBIL OIL CORPORATION " . ' . FIELD TE ST DATA, West kuparuk 'Production' Test ~o., 6570/6604 7 Ferf'd. InterVal . , Cretaceous Zone 1- I I ' ~ I 'I I I 1 ,:40 Turned to separator 40 i ) j' j 1 40 ¡ I 40 I I I 2350 1 115 I t ' 1 J .. . I . '1'325 ..\ I ;30 . '" 0 ¿~O 71 . 310 325 12 ¡ 1 t 1 I 325 , ' :30 -.. ¡ 102 40 74 ~ 310 325 128' j I, , 16 2448 , 1203 I 177 I I - :3.0 i L ,O ' 325 310 ' 325 18 2424 137 \. ! " '" L::5 'I 1 I t ' I I ! ,' :30 Started Sampling ¡ 40 325 ¡ 77 ! 310 325 18 2208 150 ! I I 17 ø5í ¡ :30 ¡ Sampling 388 I 40 325 78 310 325 -2232 I 147 I ". ¡ , \ 181 ' . I 1 :-00 L}O 325 310 : 325 I 17' 2208 ì46 Completed Sampling ¡~'4 I t -A....-' - t 7 8 9 , 10 .., " 11 Rema:ks , I T,:>talizer I R,~ading.. I " Cjbls) r Bean Size , 64ths ; ,\\ :\ Se arator ' Gas Chart I' LiqU~à" GOR Temp Press' Static Diff Rate (cu. ft. (OF) j . (psig) (psig) '~B/D) bbl.) . . i ' :. I, ' I I I ¡ " ,I Open Dn initial ,flow' j I- . j , ¡- ,\ I I I Closed for ~SI . . Gas to surface , I 040 I 40 ' I I 40 Opened on final £10\17 Hud to surface 1 I Oil to surface "'""'1¡11 .] 0 .', \ Shut tool in '~8;55PN End,O£ finalshut..in,;' ii)1",ß~ ,- L I, 310 ' 325 ! ¡ "40' I 325 ! !8l' 17 " . I , ' ;I) I' "Þ'''\ . fTIJ- Form p...,S REV, 9~1 $~ "Int.tntions". in Triplicate &: "Subsequent Reports" in Duplicate ) '\~û . STATE OF AlASKA OIL AND GAS CONSE~VATtON çOMMrTTEE 5. API NUMERICAL CODE SUNDRY NOTfaS AND R£PORTS ON WELLS (Do not use tl1is form for proposals to drill or. to deepen or plug back to a diffierent reservoir. Use "APPLICATION FOR PERl\<JI'l'-" for such propos~.) ADL 28241 1. IF INDIAN, ALLOTTEE OR TRIBE NAME 1. OIL 0 GA8 D WELL. WELL 2. NAMiii: OF OPERATOR OTHER Wildcat 8. UNIT. FARM OR LEASE NAME Mobil Oil Cor oration 3. ADDRESS OF OPERATOR 9. WELL NO. aruk State P.o. Box 1734 4. LOCA'l'ION OF WELL Alaska 99501 POOL, OR WILDCAT 1531' FEL, 2191' FSL Section 3, T11N, R11E, U.P.M. Wildcat 11. SEC., T., R., M., (BOTI'OM HOLE OBJECTIVE) At surface Section 3 T11N R11E U.P.M. 13. ELEVATIONS (Show whether DF, RT, GR, etc, 12. P T NO. 54' GR 70' KB 1 69-2~ Check Appropriate Box To tndicate N.ture of Notice, R~, or. Other 'Data 14. . NOTICBI OJ' INTIÞNT'WN 'to : 'UB'JDQUIINT RIIPORT OJ': ::::::::::::'.0.. B ::;:~:A~::p~;::"O §. :=~::~:;,:::.:. § ::::::::::::::. ~ REwa W'LL B CHAN.' PLANS (Oth..) Temporarv Suspension X (Other) (NOTE: Report re8ultllo! multiple completion on Well Completion or Recompletlon Report and Log form.) 15. DKSCRIBE PROPOSED OR CO~fPLETED OPERATIOX8 (Clearly 8tate all pertinent details, and give pertinent dates, Including eøtimated dat~ of starting anj' proPQ8ed work. . Reached a total depth of 11,5321 on 8/3/69. Suspended bottom portion of hole filled with heavy mud. Placed cement plug #1 9850', displacing 120 sax class G cement mixed with 50 1bs. of D-13-R retarder. D.O.C. to 96711 ,.leaving a 179' plug, 23' of cement above shoe of 9 5/8" casing. Perforated 4 H/F 87801/8794' and ran tight hole DST. Placed cement plug if/:2 at 9671', displacing 50 sax c1assG cement. Placed bridge plug if/:1 at 8520', leaving open perforated interval 8780' /8794'. Placed cement plug if/:3 at 8520', displacing 20 sax class G cement. Perforated 4 H/F 6574'/65851 and ran tight hole DST. Placed bridge plug #2 at 1520', leaving open perforated interval 6574'/6585'. Placed cemented plug if/:4 at 1520', displacing 75 sax class G cement. Filled hole 1520':!: to 300':!: with heavy mud, top 300' of pipe empty. Well temporarily suspended with blind rams closed on 8/9/69. . TITLE ~JJZ/,(¿e.(/'£ «r DATE /J~?vji- /!;~'/~b~ TITLE ay Jf:¡;~ ~'''I'~ DATE 4-YU$/ /~/Ý''-9 ~d See ~c6on. On Revene ~de ~ 0 NFl D EN T lA [ ¿ ~ h 'ttKcI ~~7uJJ- 6 a 11'$ tt-.- ð' - 15-;~ h 9 Form P-3 REV. 9-30-67 ~\' Submit "Intentions" tn Triplicate & "Subsequent Reports" In¡Dupllcate ~\'CONFIDENTI,AL 5, API NUMERICAL CODE Oil AND GAS CONSERVATION COMMITTEE 50-029-20014 : 6. LEASE DESIGNATION AND SERIAL NO. SUNDRY NOTIC'ES AND REPORTS ON WELLS ADL- 28241 (Do not use this form for proposals to drill or to deepen or plug back to a d1ffierent reservoir, Use "APPLICATION FOR PERMIT-" for sucþ proposals.) 1.' ' 7. IF INDIAN, ALLOTTEE OR TRIBE NAME OIL 0 GAS 0 Hï1dcat WELL WELL OTHER 2. NAME OF OPERATOR 8. UNIT FARlV[ OR LEASE NAME Mobil Oil Corporation Mobï1-~hi11ips West Kuparuk S , 3. ADDRESS OF OPERATOR 9, WELL NO. P. o. Box 1734 ANchorage Alaska 99501 3-11-11 t. LOCATION, OF WELL i 10, FIELD AND POOL, OR WILDCAT At surfaJ.531' FEL 2191'FSL Wildcat Sec. 3, T11N,R11EUPM 11. SEC" T., R" M., (BOTI'OM HOLE OBJECTIVE) See 3, T11N,R1lE UPM 13, ELEVATIONS (Show whether DF, RT. GR, etc. 12. PERMIT NO. 54' Gr 70' KB 69 - 25 STATE - OF AlASKA tate 14. Check Appropriate Box To Indicate N~ture of Notice, Report, or Other Data NOTICII OJ' INT.NTION '1'0: 8UBUQUIINT BIlPOB'I or: TE8T WATEa IBVT-orr ~ PCLL oa ALTER CASI~O ~ WATlla SUUT-orr § RIIPAIRINO WIILL ~ J'RACTCRE TREAT - MCLTIPLII COMPI.ETIJ -, J'RACTUltll TRJ:ATKIINT - .A.LTJ:RING CASING - 8HOOT oa ACIDIZII - ABANDON. - !BOOTING OR ACIDIZINO ABANDONMJlNT. - REPAIR "'JILL CHANOJl PLA1'I1 (Other) (Other) Ternporar1"ly Sus'pend X (NoTJ:: Report relultl ot multiple completion on Well .. ' Completion or Recompletlon Report and Log torm.) 15. Dt:8caIBE I'nOr08ED OR CO~ PLJ:TED OPERATIONS (Cle01'ly state all pprtlnellt details, and give pertinent dates, Includlnr estimated date ot ltartlnr an~" propoled work. ' ' ' . Set 9 5/8" casing at 9694 with Howco DV Collar at 6986 feet. Cemented 1st stage with 635 sx Class G cement. Cemented 2 nd stage with 330 sx Class G cement. Pressured up to 4000 psi. Drilled out DV Collar and' pressured to 3000 psi - held OK. Drilled to 11,532 feet. TD reached August 3, 1969. Propose to place + 300 feet cement plug at casing shoe with :t 225 feet below and :t 75 feët above shoe. Propose to set cement and + 6550 casing and perforate and test zones 8768 - 8805 feet and 6560 - 6650 feet~ , retainers 'with 50 feet of cement on top of each at :t 8750 feet ( feet, and then set a 100 foot cement plug near top of 9 5/8" install a blind flange (bolted) on! top of tubing hanger. CONFIDENTIAL .8IVÞi 'JUG 8 1i9 QIVIIIONOf OILANDGA0 ANCHOR;\GE 16. I hereby cerWy that .the torerolnr II true and correct 8IGNJDD ~~ Iff ~ ' Area Geolog1st TITLE Northwest Exploration Area, DATil August 6, 1969 TlTLID C/yl&)(UA- ~/C~¿,/ ! . , DAB -dt/ f; Jf¿'l APPROVED BY CONDl'1'rONI 01' See 'nstrudions On Reverse Side APÞ~oved èooÿ Returned I P -6 - ø - .....-... ~.:!:...~ ~ Form No. P-4 STATE OF ALASKA IRlií:..t~ SUBMIT IN DUPLICATE CONFIDENTIAL ~, REV. 9-30-67 t II" 1 læ9 5. API Nu:\iERlCAL CODE OIL AND GAS CONSERVATION COMMITIEE ... 50-029-20014 -. _.LANDGAs 6. LEASE DESIGNATION AXD SERIAL NO, - MONT'HL Y RE;PO:RT OF DRILLING ANCHORAGE ADL- 28241 AND WORKOVER OPERATIONS 1. 7. IF INDIAN', ALOTTEE OR TRIBE NAME OIL 0 GAS 0 Wildcat WELL WELL OTHER 2. NAME OF OPERATOR Mobil Oil Corporation 8. UNIT, FARM OR LEASE NAME Mobil-Phillips West Kuparuk 3, ADDRESS OF OPERATORp. Box 1734, 9. WELL NO O. Anchorage Alaska 99501 3-11-11 4, LOCATION OF WELL 10. FIELD A.."'1D POOL. OR WILDCAT Wildcat 1531' 2191' 11. SEC,. T.. R.o 1\1:.. (BOTTOM HOLE FEL FSL OBJECTIVE,) Sec. 3, T11N, RIlE, UPM Section 3, T11N, RIlE, UPM 12. PERMIT NO. 69-25 St. 13, REPORT TOTAL DEPTH AT END OF MONTH, CHA.""GES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS,. TESTS AND RESULTS. FISHING JOBS. JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HO~ CONDITIONS, Report for July 1969 Drilled 8 1/2" hole to 11,519 at end of July. Ran 9 5/8" casing described in previous report. Tested casing to 4000 psi held OK. Drilled out DV collar and tested casing to 3000 psi for 15 min. held OK. Drilled out casing shoe and continued drilling with 8 1/2" bit. Stuck core barrel at 10,340'. Backed off at safety joint leaving five 6 1/8" D. C. (157.4 feet) and a 6 3/4" core barrel and subs (71.27 feet)in hole. Top of fish at 10,111 feet. Went in with fishing tools and recovered fish. Continued drilling with 8 1/2" bit. 14. I hereby certify that the foregoing is true and correct SIGNED ~ ~~6 ~ Area Geologist TITLE Northwest Exploration AreaA'n: Augur:;t 8, ] 969 NOTE-Report on this. form is required for each calendar month, regardless of the status of operations, and must be filed in duplicatt with the Division of Mines & Minerals by the 15th of the succeeding mo nth, unless otherwise directed. ',;, ! ~ ! ¡; k' i i i ðC f) f¿ ~~- a <62 LII ,.-..., :,......... > -;..: Mobil Oil Corporation 612 SOUTH FLOWER STREET LOS ANGELES. CALIFORNIA 90054 '9"~ Northwest Exploration A~ea }I, Los An gel e s, C a 1 i for n i a HLB I rfV \ TRM f\f\ OKG_, KLV -, IJ HW!(~ REL May 7, 1969 FILE DEPARTMENT OF NATURAL RESOURCES Division of Land 306 Fifth Avenue Anchorage, Alaska At t n : Mr. F. J. Ke e n an Re: Mobil-Phillips West Kuparuk State #3-11-11 Well North Slope Province Gentlemen: The Mobil West Kuparuk State #3-11-11 wildcat well which is located 1531 I from the East line, and 2191 I from the South line of Section 3, TllN, RllE, U.P.M. was spudded May 5, 1969 at 2:30 A.M. Very truly yours, ') & ;:7 " / J . . :/ '- ,-- i/ í /. Q/J, ~ l:¿id lit tV., W. S. Blanton, . Area Landman WSB:cbg RlŒMÞ JUL 171£f9 OM8IØHOfO'lANDCMs ANCIfOaAoE í ¡ t i I I ) I t I ~ ( /: #" ~ , '.' ~.'.;1.' :¡' it. t.. , .......... ¡ , /-""', 5, API NU:\ŒRICAL CODE --- Form' :\'0. P-4 REV. :.~.<~j..e7 STÞ,TE OF ALASKA SUBMIT IN DlJPLICATE OIL AND GAS CONSERVATION COMMITTEE REPORT Of DRn.LlNG KlV v 50-029-20014 HVVK ~ 6. LEASE DES:GNA TlO:-¡ AND SERI1ŒrO ( -11 vVOl~r{OV~R OP1tRA TIONS ADL-2824l ~~LL LJ ~ESLL Ii ¡, IF I~D1A~, ALOTTEE OR TRlI3E t!n.~E 1. OTHER Hildcat T"'ADD'RÉŠ"ŠÓF öPiRA TOR 2. NA..\l:E OF OPERA,TOR Mobil Oil Corporation 8'~6t\~~t!t>hOf1 IffpJ~ NAME West Ku aruk State 9. WELL :'\0 P.O. Box 1734, Anchoraae Alaska 99501 4. LOCATIO~ OF WELL 3-11-11 10. FIELD A..'.;'D POOL, OR WILDCAT 1531' FEL 2191' FSL Wildcat 11, SEC" T.. R., 1'1'1.. (BOTI'0:\1 HOLE OBJECTIVE) Sec. 3, T.llN., R.llE., U.P.M. Sec. 3, T.llN., R.llE., U.P.M. 12. PEIL'VIIT NO, 69-25 13. REPOR.T TOTAL DEPTI-I AT E.."'iD OF MONTH, CHA.'.;'GES IN HOLE SIZE. CASING A..l\;"D CEME.-"'¡TING JOBS INCL'C'DING DEPTH SET A}'"D VOLL-:\1ES USED, PERFORATIONS. TESTS A.."'''D RESULTS. FISHING JOBS. JUNK L-"'¡ HOLE AND SIDE-TRACKED HOLE A..~D A..~Y OTHER SIGNlF'ICA.."iT CHANGES IN HO~ CONDITIONS. REPORT FOR JUNE~ 1969 Depth @ end of June - 9694'. Drilled l21/41f hole to 9694. Ran 9 5/81f casing (170 jts 43.5 ¡I/ft. S-95 from surface to 6952'; 69 jts 47 #/ft. S-95 from 6952 to 9694') to 9694'. Cemented first stage with 635 sx Class G cement; estimated top @ 8500'. HOí..JCO DV collar @ 6986'. Second stage cem.ented with 330 sx Class G cement; estimated top @ 6200'. OR DST 112 OR DST 113 OR DST ¡/4 Ran 2 wire 6599-6619 recovered 2.6 bbls gas cut oil emulsion. 8979-9001 misrun - recovered mud. 8987-9022 recovered 4 bbls gas cut mud, oil and water emulsion. line tests; one failed, other not opened. CONf\DEN1\~L ~~tl~~'i;1\JL) JUL118 OiViSiON Of Qtl AND G.\5 ÂNCHOR.ð~E 7Ït'ereb"'::' œI'tjJv that the foregoj..p.g is trUe and co~c} , . ,'" J)/>~, /.:.// // ,...-:-~t/V/~, SIGNED! .,,' '.f .'» /// U'::',. .,r. ~(/ /:¿:,o...'//.~/,> J--.nTLE / . . ".j'''' NW Area Expl. Manager DATE July 9, 1969 NOTE-Repor't - on thi{form is required for each calendar month, regardless of the status of operations. ana must De tiled In dup jcatt with the Division of Mines & Minerals by the 15th of the. succeeding mo nth, unless otherwise directed. -- :'~ ~ \ I'ÞnI7 JIt~9. P-4 N.'Y. .~ STATE Or: ALASKA Oil AND GAS CONSERVATfON CO~V~'IT£E MONIH1YREPORT OfDRII.LING AND .WOR.kOYla'OPERATfONS $1J.Ð.)fiT tN' D:1...PUCA. ~ .. ~ ~U)'S!:iUCA.L. CODi: AP~ SO-029~20014 ,", U::A. ~ .oL'f~~(¡')'tA ~LON A ~n E-r.alA.1. XO. AbL 28241 ., . «:1ft. 0 OA. 0 . "'-UL' . \! tilt-t. , J:.' NA¥£ OF ()PSRA1Qa . ertau: tfildcat t. 1r !NlllMf. ""~.^)'lU.:i' O)f H\l131: "A~t; , . t. Cl'.a~',.'M~ï (.101\ Lt:..\.U ~^N Mobi:l Phillips W. Kuparuk St. Mobil Oil Corporation t, \\'1:1.\, ~"O .. 13-11-11 H' f'~ AND N)O.:t... 0)\ WU..D..r.A7 WIldcat at, &Ð::,.T.. 1\,,)..L ÖB.uX.'T1\'Q M'i'J>4 HC>1£' 1531'FEL, 2191'PSL. Section 3. T 11 N. R lIE, UPM.. Se.ction 3. TIIN. RIlE, UPM U. Ì'~U'l' 'NO. 69-25 U 1!.EPttitr TO-rAt. p~r& AT'!;.":/) ôF:MI»)."7H. CHA.,'àEB IN 'f/'tn.£ SU~£. CA.~r!l."a ~"D C-Þ1£.~rmG JOT'.$ TNC'l.'.'D'J:'\'O D!iYnt srr A.1I:tJr \.'úl.tT'M'F.$VS;£:D',Y.£!UrÒJ~A1~O"""S. 'TESTs A:h1:t. R~f¡l,'L.n..n$.nl"'''G JOu.. .ft;"""g L~ J{OI.!: M"'tJ. S¡Dt..TJ\.A,.t'JŒ;p H01..£' ÁJÒt"tt ~~ OnŒf¡. .SJGN't:r!cJU',,'1: C:U^""I;';.~ IN'HOI..$ èO')''"Drr'1o:Ns. . . " . R.e~rt- for Hay 19'69 Drilled to 4647 fe~t on June I? 1969..' . ..fell spu.dded on 515/69.. Drilled 17 1/2u hole. to 305 feet. opened 17 1/2'~ hale to 24" ., Rân 7 joints of 20tt OD 94{j. 4-40 St and t--New casing. Baker guide sht.e at 305 fee: CeI'2ent.ed t.hrou.gh Duplex collar lit 256fe.ct. w/685 sa.cks 1-1+3% Fonda.t~ cement. Good cðœent returns toau.rfa~e. Drilled 171/2H hole to 2412 feet. Ran 69 jo1Ut9 - 13 3/Sfl on ,J 55 Sf; 'and C casing. Landed with shoe @ 2411 feet» F. C. @ 2366' - D\t Collar @ 1341 feat. Cemented 1st 9"tage w/780 sacks class G cetrlent,. Opened D. V.. collar @ 1341 and c.emented. st;.cønd. $tage w/145Ó"; sacks Fondue cement. Good cement returns. to surfa.ce drilled 12 1/4't hole to 4647 fëe,t. Ran t1otO w1re11ne te&ts @ 2601 feet ðnd 2599 feet. packers fa.il~ds -recovered drilling mud.. Ran third wire line test @, 2598 féê.t.s packer~ failed. recovered drilling mud. . . ! /1 HLB,lr(~) 'b~~' '()Jç2¡' -~ L<L V _..-,- .~~-~. HW!{ K . REl h- JIO . . ~ Ê , f:teCtniEû . J UN 1 G 1969 FILE . OIYISION OF orLAND GAS . ANCHORAGE $%GN'ED Mana.ger . .~ ~Qrth~~~~ R~v1nr~tjQ~' A~~~ Tunð ,) 1~69 "f ~ NOT ~~~ Ð{\ tl-¡;.f' f(X1tl ~ f"è'~IJI~d' for t~~. U~åt m01'AI\ r t9btðlH.~ ~ ttw: slaW! of Oþt-~4\1.Q-M. &t\' tniI~ be:: tl.i~.: ,,. ~4¡c.Jtt ' ",,(1(0{ t~ CJ;I'Íf.~fI Qf MiM!i & M¡~J\~ by thÞ.!St."- of tht ~~I~ M\Ol'ttb, ~I'\'~" CIt,=*rwiw dirertt4. :. . f(lNF'nF~fT' It, . DIVISI.. OIL AlDMS Apri110. 1969 fte: West Kuparuk State 10. 3-11-11 1obf.1 ot 1 Corporation.. operator Rr. RøHrt A. &al1tsen L.. Supervisor Rob11011c.ptmti.. ,.. Q... S. 1734 Aaci1orage, Alas. "501 Dear Sir: Eøc:1osed'lsacOP1.f the Aluka Department of Fish aDd Ðamestipulaticms 'or the above referenced well. These sttpulattøu Q)ft$titute apørtiot1 of the permit to drill the _11. Very. tnly youn. liOmer L. Burrell Director HLi1:lIY Enclosure FORM FG 74 (REV 2-67) ~ MEMORANDUM State of ..iaska .I HLB / ,i// , , TRM OKG Kl V ---- - "'--- HWK RfL TO: I Homer L. Bu rre 11, Director Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 FILE NO: fiLE DATE April 8, 1969 FROM: Robert J. Wienhold Habitat Biologist Alaska Department of Fish and Game 1018 International Airport Road Anchorage, Alaska 99502 SUBJECT: West Kuparuk State #3-11-11 Mobil Oil Corporation Operator In reference to the subject well, the Alaska Department of Fish and Game requests the following wildlife stipulations be attached to the permit to drill: 1. Prior to the beginning of drilling, a sump of sufficient size to contain all waste fluids will be constructed. This sump must be lined with material impervious to oil at all seasons during the year. 2. Prior to the beginning of drilling, adequate ditching shall surround the area, taking advantage of the natural topography of the land to insure that any spill that might occur will be drained into the sump. 3. Prior to abandonment of the site, the sump must be cleaned of all oil and covered. 4. The operator must dispose of all refuse, waste, debris~ garbage, pallet board, visqueen, barrels, etc. by being burned and non-combusted residue must be removed to a disposal site approved by the Alaska Department of Fish and Game. 5. No stream or body of water will have any foreign material added to it. This includes vegetation, soil, petroleum products or refuse. RJW: r jw cc: B. Hill i ke r RECEIVED APR 1 0 1969 D'VJS'ON OF OIL AND GAS ANCHOAAOE 'II I (p)" DIVISION OF OIL AND GAS April 3. 1969 R.e: Ueat Xuparuk State #3-11-11 Mobil Oil Corporation. Operator M'r. IohfttGalt1.- '~S....v;1-1: Xobil0¡lColporat1on .'. ... 1734 Au~..t Alaska ".1 De.. ,Str: 1ac1ø:8edp.l... '!adthct ..r_4lpp11catioafœpemittc4r1l1 t:-r.fe~-- _11.wel1a..,lu .ead...-..chtp.._ra9!:b'e':. '1ea8e _teat- .~ .. høel'..d...8ðthat all e_t.s.~llbe tle4ia withe_t. Alab :DIpat'~ of rtabaRd c....at1pul.e,tou. wit- CMet".ð, .il1 be f...... <to,.".ad .tltbee.- c0a4ttloasof .subject ,~t. ¡atM."'.' :ëaø.do-..øt.pleaiJe ao.tifythta offtH &4equat~ly 1ft..... - 'that.. -7 Mvaa 'Wltøe..'t'e8.nt. VeZ'1 tr",l, "'1. ~r L. Durretl OI.1:'.'tol' &I:jm &M1tt_.- FORM SA. I B MEMORANDUM State of Alaska DDD.108 ar od ... GAS TO: I .. a. .... J~_Þial Safety t'8l1p8Ctor ..,..~ of 1åor DATE: Aprl.1 3. 1969 FROM: Bo8z: L. Itaøel1 Mnetor SUBJECT: øe8t Iup8rUk State '3-11-11 Øøbl10tlCøponts.. ~ I8cl0ae4 .s. ...,oft- appnwdapplkattoato drl1,l for the aIJove. capt."" _11. ....j8 1810..., If FORM SA. I B MEMORANDUM State of Alaska DIYUlOH OF OIL ØD CAS TO: r Joe 11- Þepart.8at of PbD ... G88 DATE: April 3. 1'" FROM: IIø8r L. lun'ell Dinctol' SU BJ E CT: WUt""" State '3-11-11 Hohl1 011 Corpor8t1tm o,øaeor '1eaø fW eJiC10aed .. appl1eae18 Em: pend.th _111ac1 1oca~1øn,1.t f.. tbeahoweap1:1oaed ..11. Pl- fIttri.ø if tbeœe are -, PtR ad G88 .tp.4atieaø ,.. vÞb .. ... ..... Oft dte pe&'lait. Pleuent..... JODr"Gpl,8Icaptloaed ahow. ":jIt lae108ølea FORM SA. I B MEMORANDUM State of Alaska DIns.. or OIL A8D CAS TO: I Ba1:eVal1i8atoa Deput.1eo-1uioDR DATE: Apl:l1 3. 1969 FROM: ..... L.lul:nl1 Dinctot:' SUBJECT: We8t .... State '3-11-11 I18bll 011 toIpol:atioa Opera.. 1ac10884.. the. .,20" .,lkattoa foe pemiC to ckt,ll.plat ad . daeck.,. d88 ~t .f$SO for:f'11ú& eee.. "',Ija E8c..... ,~ , " <'"~- ~ Form P-l REV,9-30-67 SUBMIT IN TRI (Other instructio.n~ - reverse side) .!; STATE OF ALASKA Oil AND GAS CO NSERV AIION COMMITTEE API 50-029-20014 5, la. TYPE OJ!' WORK APPLICATION FOR PERMIT TO DRill, DEEPEN, OR PLUG BACK DRILL IX] DEEPEN 0 PLUG BACK D 6, LEASE DESIGNATION AND SERIAL NO, ADL 28241 , IF INDIAN. ALLOTTEE OR TRIBE NAME b. TYPE OJ!' WELL OIL 0 GAS 0 WEU WELL 2, NAME OF OPERATOR OTHER Wildcat SINGLE 0 ZONE ~~~.:lPI,E D 8. UNIT.f4ID4...'pl} ¡"V;A¡SE NAME MOI1~l-.t'h~ll~pS West Ku aruk State 9, WELL NO. Mobil Oil Corporation 3, ADDRESS OF OPERATOR 1;3-11-11 P O. Box 1734 Anchora e Alaska 99501 4. LOCATION OF WELL At surface 1531' FEL, 2191' FSL, Section 3~ T11N, RIlE, U.P.M. 10. FIELD AND POOL, OR WILDCAT At pro.posed pro.d. zo.ne Wildcat 11. SEC" '1'., R., M., (BOTTOM HOLE OBJECTIVE) Section 3, 12, (:bew Line site TYPE Oil & Gas Surety and/o.r No.. 15. DISTANCE FROM PROPOSED'" LOCATION TO NEAREST PROPERTY OR LEASE LINE, FT. (Also. to. nearest drig, unit, if any) , 18. DISTANCE FROM PROPOSEb LOCATION* TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. Amo~t $100 000.00 17. NO, ACRES ASSIGNED TO THiS WELL 1531 ' 2560 20. ROTARY OR CABLE TOOLS 11 200' Rota 22. APPROX. DATE WORK WILL START* Estimated 60' R PROPOSED CASING. ANbCEMENTING PROGRAM 23, SETTING DEPTH Ql'ANTITY ÖF CI!:MEN':L --- B.O.P. Program: 300' to 2200': Hydri.1 "MSplf ,3000 psi WaG, 20 3/4" nominal 2200' to 9200': 1.... Hydri1 "GK", 12", 5000 psi WaG, 13" nominal 2 ....Sh~:l:fer, J)o~b1e Gate, 12", 5000 psi WaG, 13" nominal 92'00' to T.D.: 1.. Hydtil "GK!', lot', 5000 psi WaG, 11" nominal 2 - Shaffer, Double Gate, 1Q", 5000 psi WaG, 11" nominal IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to deepen or plug back. give data on present productive zone and proposed new productive zoñe, If pro.posal is to. drill or deepen direcLonally, give pertinent data Qn subsurface locations and measured and true vertical depths, Give blowout preventer program. SIGNED DA~ March 28. 1969 TITLE Land SUP ervisor (This space fQr State Qffice use) SAMPLES AND CORE CHIPS REQUIRED CONDITIONS OF APPROVAL, IF ANY: OTHER REQUIREMENTS: 181 YES 0 NO I DIRECTIONAL SURVEY REQUIRED 0 YES XI NO 671 - 0 2... q - 2. 0 () / Y =::BYC/~~( ~~=~~~~~~:i1 &A:::l 3'D:~69 *See Instructions On Reverse Side ADril 3.. 1969 ". .,..A" ~ -..... ..-. ...--~ ~ LULU -N - - a: a: I ' , ~~ 26 25 30 I 35 36 I 31 ----.L- ,I 2 I 6 I II 12 I 7 I 14 13 I 18 f I Sf AU 1M: L f . ! ¡ 29 28 27 I hereby (ert fy thot I am pt'r;-.>erly r,('gistf'red nnd licensed to pt(1cti(c Innd surveYing In Ih~~ Sròh> of AlasKo and thot this plat reptesents a loc<:dion survey :nade by rne or l)nd~1' my 'íUpervÎ~ ion, ond that 011 dir"'en;, ions and other detoíls ate correct 32 33 34 TI2N TII N I 1 ~ ¡ I j ¡ I ì ¡ i ¡ ¡ ..-,~~~ ",,' ¡ \ ,- ---------J I WEST KUPÂRUK STATE NO- 3-" -" I I lO«lIt>d In I fSE 1/4 PROTRACTED SEC. 3, TIIN,RIIE,UMIAT MER. ALASKA C¡ur\ll.!yl!d for ! I MOBIL OIL CORP. ~ l FM LI~~~Y;~~ ASSOCI i 1 "'; lA~ ,~. ~,~ t.~,~?, ~:,~ ~ :,~,I,(;"" SUR VE ~ ?,"".' R 5,,' 1 I A n ( h , , ! (J 9 e A q', '" " -----~~ -- ~-_f'1~-~,_..~-~-~~._--_." -~~~~~., , 5 4 WEST I(UPARUK STATE.-L NO.3-1I-11 LA T.- 70° 20'06.7211 , LONG. 149018'24. t 211 y: 5,972,~58' X = 585,456 8 '-r 9 10 17 16 15 CERTiFICATE OF SUqVEY.;)R Date SURVEYOR .. ,... CHECK-LIST FOR NEW WELL PERMITS 1. Is well to be located in a defined pool.............................. 2. Do statewide rules apply ............................................ ~ 3. Is a registered survey plat attached 'j( .......................0........ --- 4. Is well located proper distance from property line ..........~....... ~ 5. Is well located proper distance from other wells .................... ~ 'r", Is sufficient undedicated acreage available in this pool............ :x' -~' Is well to be deviated .............................................. 8. Is operator the only affected party ....0............................ --- 9. Can permit be approved before ten-day wait .......................... >< 10. Does operator have a bond in force .................................. ~ 11. Is conductor string provided ........................................X 12. Is enough cement used to circulate on conductor and surface ......... ~ 13. Will surface esg. internal burst equal .5 psi/ft. to next string .... ') "",,-" .....~"'" Will cement tie-in surface & intermediate or production strings ..... Will all casing give adequate safety in collapse and tension ........ 16. Will cement cover all possible productive horizons .................. ~ -Æ£ Remarks -Ä. Uk ~. Will surface casing cover all fresh water zones ..................... ~ Does BOPE have sufficient pressure rating ...........................~ 1JIt~ Karl L. VonderAhe Robert E. Larson 17. 18. 19. Can this permit be approved tmffiediately ... ..... ... ..... ......0...... Approval Recomll1ended: Thomas R. Marshall, Jr. Harry W. Kugler O. K. Gilbreth, Jr. ~ Á>, .~I,. \ . ~~~, /11 ì~~~ /\ z.. ç~ r)' !/d.dl Æ~ -- /tt?/jr()¡/~ý / Œ I///~~ :<"/::~: > vr/¡ £ 61' A h IJø .tùM. ~ ~ \) }. ~ ~ :,1 t'Þtl. /2J 71 ~~ Well History File APPENDIX Information of detailed nature that is not particularly gennane to the Well Permitting Process but is part of the history file. . To improve the readability of the Well History file and to simplify finding information. information of this nature is accumulated at the end of the file under APPENDIX. No special' effort has been made to chronologically . , . organize this category of information. ( ( { ( ( (' ( (' ( ( ( (, ( (~ ( (, ( ( (, ( e (., DATE:: 9",,\]U -'c(] TAPE: 505.3 F IL E: "1' S D l\ l' ASH A R f; (.¡, I S 'J'A P E DO M P 1.1 1 SO~tP \fE R, SID N,'Va b -~2" QS PAGE: 1 , Ref! lta-c e Þte # f 1-~ e W, JâA.fa~K <Sf;- 4:t I C~ þe n htJ.k) 1Fð/3 ~3 kEfll HFJ\f)I:.H I.JI-' Gl'r;: I-< t" F L j\ 1>;1 ~; : ¡) l\ ;!, F: : SE~V1CE: ','~¡\:\'\f: R. E: F: Leu ¡." l' I h~ U ¡~ '1" 1 (J Ii H ö f.~ R : PR~VluUS R~EL AME: C U ¡,j hi f I' S : 13:¿ EY.'1fì:S HDSC48t,3 '137/06/09 I) I G I '. r s 1'1"',"",',<, ,'".." TAPE HI;,AIJt!.:F ,,(*~~) LE GTH; 132 BYT~S TAPS ~AM~: 06765-07 DAT'~:: 6Y/OS/14 S~RVJCE NAME: OIGITS T~PE CONTI UATION UMBER: 1 PREVIOUS TAP€ AME: CfJMME;hJ TS: ************ EüF ************ ( (' DATE: q -,j \) ... Hl TAPE: 5053 (: r Il,j E H ¡:, A t.. ¡< ( I, t,: G]' r~ : b 2. BY T' E S F I LA E: A ¡:'\ E : I.) 1 G 1 '1 S . 0 (J 1 1\, X r E: CUR L t~ Gf H: 0 1 í\ 2 if B Y'T E S P F, E V 1. U U S f I Li t.; ,1:.\ ,,;¡ t.J : (, w ~~ II L SIT t~ 1 f' IJ I,;; !~ 'r .1 (ì { SD : (lb765-07 kU 99.0UO U I 9265ÜOOOOOOOOOtì C L\ II hi : 0 . 00 () ¡STAT: 5(1.00u CfRY: 926.000 N : ~~st KUPARUK ST.tl f' : ILI)CAT L F 15.500 D tvr E: : 6 9... 5 -1 If ( ( ( ( ( (' ( (, c (" (: <. (, ( c (; (, l L f Y S D A '1' i\ S H A R F.~ LIS ], ,þ. P E: £) U ¡~1 P LISDMP VERSIONV86-12-0B ( PAGE:: 2 FILE;: 1 ( ( ( ( ( ( ( ( C C C C ( ( C ( ( ( C C ( ( ( () A '1' f::: : 9 - J U .., ~ì '7 TAPI:'~: 50~)" F IlJr:Y S Di\ T A SHARE LI S "I' API': n IH?P LISfH4P V EHSIOH V R 6-12-08 ( ( D AT ^ F (] H iI, 'I' S P ¡., C J i:' 1 C ~\ 1'ItJ E~NTR ~ t',LJlJCKS: f't, p~, A t S I Z!:'" REP F:NTRY ~~~~~----~'~-~-~---~--~-~~----.------~-~~--~---._--~~--.-~- ( U P I u L¡ "~ F tJ r~ G F'HA E SPi\CIJ\JG F'H.A t SP~\Cl¡\!G UNI'fS OÞ.TU hlJCïCK SUB-J'Y PE ""EHN\ i J¡,ifU8, it 1. 4: 4- 1 1 66 73 65 66 66 H (' Ij Ib I) 1. r~ C H ( ( D AT U ¡Vi S P F; C 1. f~ 1. C f\ 'j' J U t1LJUCKS: ( Ct-H\N In fJ I 'Ji S LI U G C R. veL S ¡,il () D fH~: p ~------~._-----------~---~----~-----------------~----------- SIZE; SAMPS ( 1. !)F: p '1' fir 0 () 0 0 4 1 6 8 2 SP ¡\ii'll 5 1 () 1 4 1 f 8 ,¡ J SN 5 4 1 6 J 4 1 b 8 .4 1 LD !)H 5 1 2 if 6 1 4 1 b 8 5 C I LD ;,'1Ii M H fJ 5 1 1 It, b .1 4 1 6 8 ('" ( ( (' ( (, ( <. ( ( E- c. 1.(01) 6.000 i.otIC) o.Oc() PAGE: FILE: 3 1 ( ( D 1\ T ~.. : 9 .... J tl ¡. ... '7 TA,PE: 5053 I-DF.I?T (" (' 52:,:).ÜÜU 5 2 Ij (I. .) 5 1 0 (I . n () (¡ 5 0 \) 0 . it 0 ü 4 y 0 f) '" f) (i ,) 4ROO.ODt) 4- "7 0 I) . (, if <1 6 () f) . ~) 0 Ü 4500.. 0:)1\ 4400.0;)¡) 4.300", 01)0 4200.000 410C.OO'') 4000.000 3900.Ü0 3800.000 3700.00 3600.0 0 3500.(} 3400. 0 3300.00!) , ..3 2 0 0.. Ü () 310().OO 3000.000 29 .00 2BOO.OO 2700.000 2 .000 2500,,0 2400.0 (} 230Ü.() '2 20 (} ,,0 2100.() 2000.0'0 1900. 1900.00(1 ( ( ( ( (' ( ( ( ( (: ( PILE: TRA.I (; ( )...sp """'2J.O¿5 -1'1.110 -¡¡:¡.4bO "'35.~U)5 -23.955 "'19.905 -2l.51u -2J.':J45 -65.040 -3b.höO -16.330 -1.0.450 -6S.ö50 -52.310 -')0.080 .. 4 7 . 9 '7() -26.090 ..7 3() -2b.¿1 -4:4.51.0 -5:1.370 -63.31() -57. 30ft -33.710 -6().30() -)5. -55.H20 -56.930 -47.510 -24.470 8.090 -14.920 "'" I. . 450 ¿.360 -25.41 '""25.410 {, ********.*** EOf ************ T APE:l' RA.1 LE:H (- <. 3"SiiJ 2.832 2.802 4.114: 3.364: 3.0B2 2.838 ï:.H14 3.594 6.656 6.87H b.u.32 6.2ij8 3.580 6.124 6.6B4 6.848 7.830 4.91() 6.12& 8.614 9.308 12.626 12.144 8.898 20.240 12.184 44.680 26.060 16.432 22.160 17.28Ü 19.44Q 52.060 15.190 14.200 14.200 13'2 dY(TES : ()6765-07 69/05/14 E~: DIGllS J sr:Rv let. TAPE COj'~;f 1 I.Jþ¡J'l I':)("J [' f~ eLl ~ 'TAPE. HEA,DE>i;~ ( HILF.:YS IJI\TASHAFE [.IS TAPE: DUî\i1P P.fINIJ LlSDMP VERSION VBb-12-08 4-1LD 5-Clf.J1) LE GTH: 62 BYTES ~' J f) t:<,: ¡~ ¡V¡ E:: I) 1 G ITS. 001 AX RECORD L~ : 01024 l' f'lIIE:; A E: 2.744 2.214 3.770 3.260 L.920 2.770 2.720 3.572 4.106 5.5(16 5.046 5.252 2.340 3.882 5.600 4.470 6.986 4.396 5.1.12 6.774 7.408 11..196 9.556 6.674 18.776 10.322 37.560 21.1.40 14.326 17.490 14.li20 15.170 4,2.440 12.60(1 11.47(i 11.470 315.000 322.250 254.400 266.949 263.399 348.199 290.600 239.40(! 226.200 166.500 192.600 196.400 395.100 255.200 182.550 227.350 1.44.850 22B.55P 202.10() 15(J.300 i 1.45.650 1 () 2 . 0 5 0 11.1.200 1.63.750 63.850 108.200 34.550 49.700 76.700 55.160 62.940 62.060 22.420 72.920 77.520 77.520 PAGE:: FIlIE: : 4 t 4 c c c c , (" ( DAT{<~: 9-,jU -,,7 TAPF~: 5053 R 1 it F: ï S I) A T ASH ARt: LIS TAP f 0 fJt~1 P LlSOMP VERSION V~6-12-08 PAGF~ : fllIE:: 5 1 ( LE GT:t: l' i~, t>. t~ ,~\ t;: ] .3 ¿ E~ Y '1 t~ S ( ¡)¡.\rt~: b9/05/2¡; S~kVICF A~E: OIGITS T ~ P E: C 0 ~\1 T J \ Ud' 1 [I U ;-, R E: H : 2 PR~VIUGS IAPE AM~:Ob165-o7 C ¡j If, fA 1:', T 5 : ( *****~****** tOF ************ ( ( (' ( (' ( ( ( ( ( ( ( ( ( ( e ( ( C' D A or F' : 9 - J U ""~( 1 TAPE,: 51)53 { FIJ.iF' rl!-;l\Uì~F (' Ijl- c,'rH: t>, b¥'ft:S flLi A~~: U]GliS.OO2 t'" x. R t. C U H ¡. i fJ ~,: (~I' I-¡.: 0 1 (. 2 l~ H Y 1. ¡.~ S PRY,VJtJUS ~JL¡j:, A. E:: (1 w ~~ [~j,./ S 1. '[ ~ I ¡" F 1..1 R. 11'1 f:'¡' "llJ ¡\! SU"I : 067 b5-c17 k tJ!\, Y 9 . () 0 ~J Y2 6 5 Ü 0 nor} 00 0 O()(} 1). ()UÜ 51).000 926.000 ~ST KUPARUK ST.#! F' : \1\ilLDCt\T L f: 15.500 DA'rE : 69- 5-28 c u 1 CLIO SJ i\ l' : CTkY : ( ( f ( ( (0 ( ( ( (; (' ( ( (, HI,llE;ïS I)A'I'ASHAKf'~ l.dS TAPE DUMP LISOMP VERSION VB6~12-~8 P A Gf.4; : FILE: 6 2 ( ( f) A r F : q "'" ,J \.1 - b 1 TAPE: 5(15-' H ILEYS ()AT!\SHAHE 1¡15 'rAPE: DUlvíP LISO~PVERSIUN V86-12-0a PAGE: ~"'ILE:: 7 2 ( D A T A F U H iI, T S \.) 1-., C ) fIe !~ r 1 U ¡'¡ E N T R ï h lJ DC ¡.:. S : ( 'I':i P fD ~ r\ !'¥'\ t,~~ S I Zf.~ R~:P E:J", TR Y ~---~~-~-~~~~~~----~.~-~.--~--~~~-~---~-~-------~-~.-----~ (~ 4 ( ¡ P I D \.1 'I) F LAG f F. At.' f. S P t, C 1 G Ft-<f., ~. SPACING il!\tlTS It p, 1 U b L U C t<. S Ii H - 'I' Y I? t, fE:h 1 ;\TUR 1 It 4 I 1 66 73 65 66 66 1.000 6.000 h (' 9 l b U'JCH 1.000 0.001} ( ( DATUM SPECIF1CATIO BLOCKS: CH ID NITS LUG CRY CLS MOO SlZ~: SA~!iPS PEP ( ~~_M_~_-_--------------.-.------------.-__~_M____~_*-~-----. (' DE p'r F 0 0 0 0 4 1 6 8 ,"> GR GA P 1 45 3 1 0 1 4 1 68 I.. 3 t~ H (JO G/ C 3 i+ 5 3 5 1 4 1 h tI ( ( (' ( ( ( ( ( ( ( e- ( (' ( D A 'l'E: 9"",JU .. 7 Tl\Pfì;: 5053 l-DEP't ( ( 5250.0(10 5 ¿ 0 0 . in) iJ 5 tOO. 0 tJ ,) 5000.0'J(1 4.9 ('¡ 0 . f)OÍ) 4800.'.ìOO 4700.00D 4600.{)()t) 4500. I) 4400.0i)() 4 3 n f) .. Or) ;') 4200.000 41()1).î)OO 4000.00() 3900.f):) 38{JO.GOO .3700. (1 3600. ()OO 3500.0 340() .1)0 3300.000 3200. 00 3100.000 3000.00 29(J().. nor) 28 .. 0 2700..000 2600.000 2500. U 2410. 0 ( (' ( ( ( ( ( (~, ( F' I L E: 1j1 R AIL E; H ( AX ( HILEYS !)t~TASHARE LIS rrAPE DUî4P ((.rî{NI) LI5I)(.î¡p VERSION V H 6-12-08 PA GE:: : f'ILE: 2-GH 3-RHCJb 'I í}. ~ b G t:'b.93!) 1'51.945 10.!)95 03. t,30 7J.79Ü 5d.i15 6(1.I,()Ú 44.17~) 43.u20 56.625 41.550 22.610 4.0.500 45.720 32.540 b 4 .9 '7 () 't5.'230 4 9 . 1 (I () 13.350 59.3513 37.610 43.84(') 70.670 31.80() 57.71¡) 53.:340 .39.14() 57.27(1 :35.10() 2.040 2.176 2.344 2.373 2.365 2.261 2.252 2.¿!82 2.269 2.339 2.311 2.354 2.09B 2.229 2.180 2.135 2 ..3 11 2.172 2.173 2.076 2.083 .2.110 2.17:1 2.256 2.109 2.233 2.204 '2.109 2.237 2.382 L~ GTH: 62 BYTES Fll.,Jí~: ;,J¡'1,hfíE: DIGITS.OO2 OP!) 1.¡F.~i\)Gr!.)j: 01024 BYT'é:S F"l L, E; A : ( *********'** €Of ***.******** 1~ AP E T H l\ Il.J E: f{ ( LE G'I'H: 132 ßYTf~;S ' ' E ¡~ DAT~:: 69/05/28 A E;; OlGI'I',5 U b(~H: 2 ( S~~PV ICE.: TAPE CD 1'1 Hi"!,! { T A.PEHF:/~.DEH ( E- 11ÄPE~ CIJN'I'l l't F~ ¡:,¡ F, V I C) 1..1 S '1 ( liE: Gl'H: "! Pe; AE: O¡'1TE,: 69/5/14 E: DIGI'rS :3 1 32 fjYTES 8 2 ( ( ( ("' (' ( ( ( (' ( (, ( (' ( ( ( (~ ( c, ( t- (M DATE: q....,)U -H7 TAPE: 5053 RILEYS DATASHARE LIS TAPE DUMP hISI)!\!P VERSION V86-12-08 PAGE: : FILE: C U ,"¡ ¡~: i'i T S : * * * * * .. * '* .. * * * t, 1.1 ¡'" * * * ** * '* * * * * * 9 2 (" (" DArr:: 9-dìJ -h 1 TAPE: 5053 (' FILE H/:',ALìt.P ( Li GIN: 62 bYTES FIL~ A E: DIGITS.G03 ~: f~ X H F. C ¡J h ì L E ¡\¡ G r H: n 1 I) 2 4 P Y. '1 E S P t"', t: V I U U S ~ 111 I~: hI f.\ E: ( ItJE:LL5ITE: 1 FLip I\'I'JU SDN : ,,¡b'765-07 PU 1.000 íJ J 92 b 5 () (\ 0 (I ()!) 0 0 00(1 CUCJ;\i : 0.000 S ]' Ä T : 5 0 .. 00 0 CTk¥: 926.000 ,~ : '!',¡ E: S 'lK U P A H (.I K ST.:#:l r : ¥',¡ILOCAT Eli'.-i/:<' 15.500 DA 'J' F~ : 6 9 - 5.. 1 4 ( { (" (" ( ( (' ( ( ( ( ( ( (, ( e ( k II, ~: Y S D A'f ASH ARE LIS TAP E: () U !VI P LISDMP VERSION V86-12-0B PAGE: : F" J L E : 10 3 ( (' DATtë:: 9-,JU ...HI TAPE:: 5 53 F~ Ii) E' Y S [> A T ASH .A REi 1 S TAP E D U /v1 P LISDMP VERSION VB6-12~~8 PAGE: fILE:: II 3 ( 0 A '}' À F U H 1-\ '[, S P F'CI F 1 C ¡~ T' J D I'i E.: NTH Y H t. 1..1 C f\ S : (' r'~ Pi:. f;. r, SIZE REP r~NTRY ----~---.--~----~--~-----~-_.-~--~-_.~-------~~---------~- ( if ~ 9 1 b I) (Jt->/!)(ì FLtf'IG FPÞ\ E SPAC t G VRAME SPACING U~ITS !)t\T¡j B J(JCK St¡f,-'ryp~: T' E H ì'i\ l I'.. ¡\ T' l) R '1 4 4 1 1 66 73 65 66 66 1.000 6.000 ( INCH 1.01'0 0.000 ( { DATUi\lj SP I F' I C {\ 'f' J [J BLUCKS: CHA!\ì 10 UNITS LOG CRV CL5MOD SIZf S¡U-1PS HEP (: .-----_.~._---~-------..-~----~------~----~~------------ ( :t D E: P'I' fl n 0 0 0 4 t 68 2 GH GAP]. 6 () 3 1 0 1 4 1. 6 8 3 0'1' tiS I f b 0 5 2 .3 2 1 ,~ 1 6B 4 SP V 60 1 0 1. 4 1 b 8 ( ( (' ( <- (, ( ( ( ( é ( ( { (' (' (' { ( ( ( ( (- ( ( ( (- ( ( '(, c ( ( <, D ATE: : 9 .. J !J \\) ... 8 7 TAPE:: 51'153 1 ... D ~; PI ¿....G~ 525G.n 5iOO.O[)\) 51tJÜ.{' fì 500(t. nOn 49UO.0 48 I) 0 . i) ,) ~) 4700.000 460(;.000 45\)(\. Ui;ro 4400.0(1) 430().OOO 4200.000 4100.0i)0 4000.000 3900.0()() 3800.000 3700.00 3600.0!)¡) 3500.0 (~ 3400.. O()O 33(¡0.000 3200.0() .3100. or) 3000.f1O 29()f, '" 000 28tHl.!) 2700.000 2600.000 2500.00D 2400.0 2'300.() 220().O/)O 210 .OOC) 2000. () 19ÜÜ.Ù 1900. - 9 9 9 . ¡H) :} ... 9 1.4 ':1 . (¡(HI -99~.O(ìn -999. (01) -9Y9.(1)n - 9 9 9 . n I} I) -999.000 -999.000 -99Y. (1(11' -999.000 -999.()\)O -999. (IUO -999.0C)() -999.(lní) "'" 9 9 9 .. 0 () 0 -999.000 -999.00() ...999.U (I -999.0(10 -999. O() 0 -999.0 () .999.000 -999.000 -999. 00 -999.0()O 65.235 29.310 26.400 41.490 1.95 5.1 .:255 59.H20 47.64 53.0'70 01.050 61.050 FILE: rF;:i\ll.~I::H, 3 -0'1' 104.040 105.570 lÚO.01O J02.190 .lÛ6.22() 126.860 114.100 102.350 1\.11.330 104.950 111.200 1,Ü9.190 119.010 121.830 123.600 126.150 1.22.540 132.990 131.160 132.890 136.130 1.40.370 133.020 146.240 160.790 138.21() :132.950 136.570 .\50.220 158.430 143.470 141).57Ü :l30.090 158.130 '156.380 156.3BO LE 62 BYTES FILE: DIGITS.OO3 AX RECURD LE GTH: 01024 BYTES Et.l' fILe: *********'** E.,Llt" '************ rrAPE: Ih.Al 132 BYTES Lx ~; G l' : 'I' ~)E, A E: OATE:: 105/14 S F"P Ii 1 C E: l\ F:: 1)1 G I '1' 5 T l\P E CO ('[1\ U t\ T 1 0 \,1 B f~: k : 3 e: Xl 'I,' i\ P t:; ?\. \j E: : C¡] 'fS: RE:E;L 'I' H/\ ILEA. R I I.J E: Y s r) A T ASH ARE: LIS 11 A PIED U M P (rvj r N I ) LISOMP VERSION V8~~12~08 P AGF~: f"II.AE: 12 3 ~-sP -76.650 -7t).825 -82.815 -91.410 -B5.125 -8'7.405 -82.545 -93.855 -131.370 -90.570 -44.850 ""'41.300 ... 9 0 . 6 1:0 -74.280 -34.090 -72.990 .34.770 .37.300 -S4.640 -65.140 -64.320 -78.940 ---79.970 -48.270 -70.420 -47.4BO -999.000 -999.000 -999.000 .999.000 -999.000 -999.000 -999.0(ì() -999.ÜOO -999.000 ..999.()OO (' f" DATE:: Y--,JU ....ö7 l'APE: 50..,3 R 1 [,¡.:Y S DA'T ASHARE f.JIS TAPE: !)U MP LISDt-1F> VE:RstON '\l¥Q6-12...0H PAGE: FILE: 13 3 (' Îlt:\!G'CH: ~i2 bi.TES F E t,. tJ !\; A ,il t :, K () S C ,+ 3 ì)1~rE;: H."!/Oo/O"1 S£RVIC¿ ~A E: DIGiTS R. E: f.: L C [J ¡'J " 1 I,í A '[ 1 t) . "~ U :~ 8 E H : ,.~ E XI' R t' P; LI ¡..¡ .A .¥ì l-'; : (:U r; 1'5: (. ( * * * * ** * * * * ;: * t. U f * * * '* '* ** * * * '* * ( ************ ~O~ *******.**** { ( (. (' ( C' ( (i (. (, ( ( ( (, ( c,