Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout195-018
;~
,
f
",
THE MATERIAL UNDER THIS COVER HAS BEEN
~ICROFIL~ED
O~ OR BEFORE
JA~LARY 03, 2001
\t'I~'~·"":.\r··' '''..... '. ',.
.' '!i;!'~i¡::-~ "t",g¡¡__ ~. ,"I. OJ. .
;:.11"Y'.t,~ ~" "', M." ~;,:. _.
P L ~ .
E
:,_:.:t":':::',¡~A·:;/;"/,'N' ',' ','.' ' . . ":,",' W
" . ": ',", :-~, ~ ,.~:," M" ,";..: ; J;. ,."..':~ \"' "," "~' . {i..' '
MATE IAL UNDER
THISM ARKER
C:LORl\MFll.M,DOC
DIV 0F OIL AND GAS
!
,(
FAX NO. 9075623852
(
DEPARTMENT OF NATURAL RESOURCES
December 17, 1997
DIVISION OF OIL AND GAS
D. W. Johnston, Chainnan, AOGCC
A laska Oil and Gas Conservation Commission
300 1 Porcupine Drive
Anchorage, AK 99501..3192
Subject: Release of ARCa Alpine No.1 and lA wells
Dear Cornmíssioner Johnston:
P, 02
TONY KNOWLES. GOVERNOR
3rS01 C STREET. SUITE 7380
ANCHORAGE. ALASKA 99509-5948
PHONE: (907) 762-2549
On February 7, 1997, I granted extended confidentiality for the Alpine No.1, No. lA and
No. IB wells until 30 days after unleased acreage significant to £he wen was offered for
lease in State Sale 86. Sale 86 was held on November 17, 1997. Therefore, the wells no
longer qualify for extended confidentiality and the well data for Alpine No. 1 and No. 1 A
should be released on December 18, 1997. Well data for Alpine No. IB should be
released 25 month~ from its completion date, which was March 23, 1996. By copy of
this letter T am notifying ARCa Alaska Inc. of the upcoming release of this well data..
~A-.~__
Kenneth A. Boyd
Director
Cc: Jim Ruud, Land Manager, ARCO Alaska Inc.
Wll\
RL~
qç- ~ 0 L ~
.,. '..
RECEIVED
DEC 1 7 1997
ÄJasKa aUA Gas.Cons.~U»l,
, . AñChOfaQê , .. ", . -
DEC 17 '97 08:47AM BP EXPLORATION AK
P.l/3
,
./.
'g~~.~
COMM œ -
RES_ ENG . I
'SR~NG ¡f?
NRO .- . .
.SRGÉÓL~
GEOL ASS}" }~ ~
STAT TECh !
STAT TECH '
To: Bob Crandell, Lori Taylor and Howard Okland
From: Walter Tifental
BP Exploration Alaska
564·4286
9c)-OI-g>
FILE
Attached is a copy of a letter from Dave Sutter, outlining the release of Alpine
1, lA and lB. The release data was set for 30 days after the Sale 86. Since the
sale occurred on Nov 18 today should be the release date. Please contact the
proper people at Division of Oil and Gas about this matter.
v:;ou4"
Page 1 of~:?
~.- RECEIVED
tCV t (
\leQ,.r J ,<- C e. DEC 17 1997
¡:Pil J/t .f.l--- Alaska 01/ &AGas Cons. CommJssion
~ nChorage
~_... . - .. ,
DEC 17 ~97 08:48AM BP EXPLORATION AK
.~
- ~
"'. i
P.2/3
.../ .
. æ'í-~ ~ CJfC:'
~ L·~'~ U;
~~ !Æ~~~&~&
,"
1'ONY KNOWJ,.... ~OV.tfNOIf
, .
.DEPAR~ OF NA'I'tJ1U.L'lŒSOUKCES
DIVISION OF OIL AND GAS
I··
J601 "CII STREEl'. SUlTE 1.380
ANCHOM~.AL./CSKÂ 99JØJ-J94
, PHONE: (;901) 26J...878.f.
Pcbtuazr 7. 1997 .
-.-7~
DavidA Sutœr '
. Lanc1 Manager
, AR.Ca ,Alaska Ine.'
. P..O. Box 100360
Anchoragc. AX 9951().()36Q
. ,
.Subject: ~uest for ~œnded ~nf1deß1ia1ity
ARCO Alpine No. 1~ IA. and 1'~ '
Dear Mr, Sutter~
I '. I
,In your lanuuy 22. 19971ctt~ you 1'eQuestcd ~œnde4 c:onfidcndality for. the ARCO '
Alpine No.1. lA, ~d 1S wells Wlder the autbori~ of tIAAC 83~153. UDda'thiS statute:
.' . t· .
"If the commissioner finds tb,at reporu of 'inf~'ûon required under A.S.
31.05..03S(a) eontain $ignif~ant infonœdon relating'to the valua.tion of
\D11cased land within a Wee mi1~ radius of.the weD from whicb these I'JJOtIi'or
, information are obtained, the commissioner 'wì11upon written request of the '
owner of øe' weUt keep the. reports or information conti<lendal,for a reasonable
time not 10 exceed 90 clays after the disposal of, the u'nleased 1an4, un1ess the
, owner of the well gives ~ssion tQ,relcue dle,ICpOrtS'and inf~on·.t.an
, earlier date. The cqmmissioner will. ill !lis or her discretion. extend
cOnfidentiality to repons or information under A~ ,31.05.035 &om a 'well
locatccl more than three miles from any UDleu.sed land íf the owner of me well,
from', which mC$~ tCpons Of infon:Dation are derived makes a sumc:i~nt
, sbowing that the repons or jnfonnation COQWn signifiÇJnt infonna:rion relating
to the Yal~~~on of ~nl~ascd. land ~>,onc! the th~mu~ radius. I.
The Alpine No. 1 t lA, and 1 B, wells lie greater than duee mil~ but less than five from
ulÙe.a,sèd land ~hich is cumntly includeCl as,pan of the State Lease Sale 86.
, '
, '
, . '
. Following your Rq,uest for ~tended confid.entiality, a review of the data wa.s made by ,
DIvision 'of Oil and GaS tcchnical staff. This review was aided by'~ 'teçhn1c~ ~ting held
on Ian\.1#)' 31, 1997 with membets of ARCOts land andgeoseience staff. Based upon the
[recOmmendation of division teChnical staff B¡nd. under the departmental delegation of
auChoritYt'l agn-.e'tQ exEend the çonfidcntiality of the ARCO'Alpino No.. lilA, and.1B
woUs unlil 30 diy5 e&r State Sal~' 86. which is currently schedulcò for September 30.
1997 _ No further extension of confidentiality for this well dati Will be grættcð.
RECEIVED'
D'EC 17 1997·' .
Alaska 011 & Gas Cons. Commission
Anchorage
,..,.. . ..
_ '.·M!·-
~,~t
D~:i7 '97 08:48AM BP EXPLORATION AK
r I~
,.,
(
P.3/3
,...,~
. , .
Byeopy of this lcna I am r.eq~cstinl that the Alaska Oil and Gu Conservation
Co~ion ex.~cnd the confidenti~ity of data from ~o ~lpine No.1.' 1~, and lB woUs
unâl funhcr noace. -
. Sînctzely,
~-^~....
Kenneth' A. Boyd . \ '
Director "
cç: D.W.. Johnston, Commissioner, AOOCC
"
--
RECE"VED
orc 17.1997
Alaska Oil & Gas Cons_ Commission
Anchorage
('
¿V~/ ~¿/tM-dv/eJ £) c,(! r: lir
\,
¿~zh/ 7 #¿.
~ ~e//'j /Å./ é-e>7/~tVVc- ~ ~ð
~~ ..~ £ 4?~/7 4~k
ÚcJr:) ð/~ ~s.C~~¡'
/)?¿
J{ rr{1 !u,U{
UIV Ur UIL HNU uH~
rH^ NU. ~U{bb¿jtlb¿
~. U¿IUj
Ii
, . ,
'. .
.~ ( 'NY KNOWLES, GOVERNOR
'. .,
....... .
. " . I·t ....
...... . - ..... .
DEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL AND GAS
3601 "C" STREET. SUITE 1380
ANCHORAGE. ALASKA 99503-5948
PHONE: (907) 269-8784
~
February 7, 1997
David A. Sutter
Land Manager
ARCa Alaska Inc.
P~O. Box 100360
Anch~s(" AK. 99510-0360
~t: Request for extended confidenûalily
C''-'J'''''' ARCa Alpine No.1? 1A, and lB
iJ.,.!,.... . £
Lo'l. -- µ-
- -" -------
)
Dear Mr. Sutter:
In your January 22, 19971etttr you rcquest«! extended confidentiality for the ARCa
Alpine No.1? lA. and IB wells under the authority of 11AAC 83.153. Under this statute:
"If the commissioner finds that reports of information required under A.S.
31.05.035(a.) contain significant infonnation relating to the valuation of
unleased land within a three mile radius of the wen from which these reports or
information arc obtained, the cotnmissioner win upon written request of the
owner of the well, keep the repurts or infonnation confidential for a reasonable
time not to exceed 90 days after the. disposal of the unleas~d land) unless the
owner of the well gives pennission to release the reports and infonnation at an
earlier date. The comulissioner will, in his or her discreùon, extend
confuientiaHty to reports or infonnation under AS 31.05.035 from a well
located more than three miles from any unlea.sed land if the owner of the well
from which. these reports or information are derived makes a sufficient
showing that the reports or infonnation contain significant information relating
to the valuation of unleased land beyond the three-mile radius."
The Alpine No. l~ lA~ and IB wells lie greater than three miles but less than five from
unleased land which is currently included as part of the State Lease Sale 86.
Following your request for eXtended ~OIlfidcntia1ity ~ a rcview of the data was made by
Division of Oil and Gas technical staff. This review was aided by a technical meeting held
on~January 31, 1997 with members of ARCQ's land and geoscience staff. Based upon the
reconunendation of division technical staff and under the departmental delegation of
authoritY7 I agree to extend the confidentiality of the ARCa Alpine No.1, lA, Md IB
wells until 30 days after State Sale &6, which is cumntly scheduled for September 30,
1997. No funh~r t)(tension of confidentiality for this well data will be granted.
RECEIVED
FEB 10 1997
Alaska Oil & Gas Cons. ConuntSSiOo
Anchorage
,-97 FRI 16:07
DIV OF OIL AND GAS
(
FAX NO. 9075623852
(
P. 03/03
By copy of this letter I am fé".questing that the Alaska Oil and Gas Conservation
Commissio1l extend the confidentiality of data from the Alpine No. 15 lA, and IB wells
until further notice.
Sincerely)
~.À~
Kenneth A. Boyù \
Dire.ctOf
cc: D.W. Johnston, Commissioner, AOGCC
RECEIVED
FEB 1 0 1997
Alaska Oil & Gas Cons. Co~\m':$io(l
Anchorage
(
(
/\ () C C: C: 1 ¡Ioj!' i./I (I U ':=) I ',,'1/ s ¡ I I' ,.~.i '.~i :::~ 1
G~: 0 i U'd ·'f (; ,J I I'..í ,~S!·t::8 ï" 'ï a I s I (I V i,::: (I t 0 j" 'of 0 ,:3 ·t~ i~~:. iì / ? :3 / 9 C
TD tfq"'lo
p F Fd'~\I T 0 þ, r /\ T D .!-\ T ,ú,...J:' L U :3 ¡1 ð j ú J./) (f¡;.. r<ø. ðll';n.9 F: U ¡,...¡ 0/\ T E.J? E C \/D
~. _., ." ~~. ...... ....... ...~ ",- '" .~.' "'..' ._ ._ ..... ,..... -,H ....... ....... '........ ........ ....... ."'" ,..,~ .,., ...,. ,.,' -"-.......,,........ ,.y ,.... _ '..... ",' ..,. ....... ,..... "'... ...... ".. ...., "," .." "., ... .". ...... ....
Si ~:; ... OJ 8
9 S. ':> 0 'j d
%",01 e
9 ~~"" 0 'j 8
9 t,·" OJ [:
~35'''O'1t:
9~5""O'¡~3
9~,w'O'if3
9 5 ,,- Oi H
95,' 0 'i :~?
95·wOie
9 ~~. "" 0 -¡ *:)
/\ r" ::.~~~
\I\/I?"~ ::;;
6743
:r1.~...... <~'~I () '~'-T ,--,-, iJ':"llF, '·-"·IF i-,j_...., .'
~. . I I I U ... ·1 1·.1 ~I ,II I,,! ¡' i'¡ I':' il,"· ,,1/ ~\' ¡' I 1\ ..! ¡ L,' 'I" i . :-., ·1
_ I .., "N ...., t l '...'10 .. \.... I ...... I ,. ....,~ . ,I r.. ...... "--
o ? ,/' 0 ~:~: ,/ s) f\
o ::;-( \( D I T C: ¡-ilt 9 2 9 ~'j ß 0 O· 9 D !.¡. () ::~:; ~;.; 1* 9 2 9
o j ,/ 2:i'1' /' 9 5
0....\1!_ V 0 r< ILL I ì"' (1
F: 'j '1/ 'J 2,v'02/ 'it\/:J~S
t 1l'Y'~ r.. Spw.J.f 11t J/i,f/fJ - ") ..,~ M .. ,"-'
1.)+.1 ¿ 1,).1 ~~ t:,
GECITC)P:~,
d/.--"O
() {i· ,/' 2 () ,/ D ~::'
L, I ::::
r;: (I
C)L~l/ 20/' ~)~~,
t\''I~\ID f~~ Ulo\¡\\ ~.:r- y 1"$Y'trt~ S~
(-'I t:; 9 ,.. E-: 1,,1,1 F' {. / (~I~,l {~I / [I .;:; r: ~I' :::'1, 0 0 .... .., '~ .1. 'i
.... .....1 r~'l . If .. 1" l .....þ ~ ',..,1 I ',_ Y "ì t- ¡ ~... ....,.. ~,
() Lt /' 2: 0 /i S: ~:,
~, ..., ~3
()7//09,,/95,
T\lD
r"'1 ,,,:; Po' / t':' l,I/'I:~' I,. /' (~ 1\ I (', / I'~I ':~ F . ~' ~~ 0 0,1 -, q (:, LI' () /\111'·.,'.)
1.,,- v.' ",I ,,,, ~ '. -t " '..~ \,....... / ..... .....,. ~ '1 t.. . 'w......· "
Lt.. .w s{
07./09...i9!5
, , , 0~'ðr
[~ ,''', t: 'C-" f" I l ,'~ \1 ,., l ''', F 0 '1k- ·7 ~ I ,. "f" '[-"
",I,j n: / I:;:. \'\1 ..: /.. / I", I ,~ I,,) ,"" ;:;. '~, . .-;c:;. ,~,,'- ;:;: 4 ;~( \I,)
18ðf~'
D 13 F2 ,/' E I,hl f;: L¡, ,...i C r) C) /i :3 F D L ,+-2-fr"':9.9 h 0 I'i! D
011../::20/'95
Otl',Ii20,/9~5
F7 0 p ¡...j Þ" T I ()t\! L ()(3
,./ i -, C' J:I~~
....K I;¿ 1'''' ,. '''' J
Oh,/' 20",/ 9~::.
~lJ~
{tð U~
F () R ¡,,'j ,t.\, T I OJ',,} L ()G
, ./' 'j' ') l"', ".. (:1 (~ .0' I, f'¡
~ ~...~ ...:J'w"'1'\...
o (j ""i1 :? ,/i 9 b
(1 ¡", V
''''¡'I'' i.. '"'' 1"1 t1~1'1..t-~I' '-'~I" ""!~:~l~1 ~1" I.., ,'. '.j iYfJ~ ~/"" " ·1·"'1\"'\
\...,~ .'~ ~...... .~) ~~~ 1_ r-,;: ~~~I :..::! 1.,.,..,. ,~ '..... ~ ~ ....;
vA ~(." J ",-i- ?Y l4. ~
i\nd t"'e(:::(~-:I "led?
'I~I ,- '.' ) ""\ '~)
',\I ~~ ':~;ì I' .
\"~ ,-
t I,", E~
"i') ,ei! c (') t' e (1 ''?
~ ", ¡"" .' 'j V"', 1 ,"" '.¡
~ ll~:;: I::') .:~ 0::.
!'ì()
desct'iption received?
~,l :~~ :3
ves
þ, ¡"':3 v'lei ï t ::~ s t ::: ¡'" E: q U 'I ¡'" e (:1 ? 'i \~ :s) (~:3 (; ø ~i 'v' ø d '2 ye :i5 no
\,\1,:::. ., ·1 ':1' ç" ii' ,'" (,.,., ""'\ 1'·1'1 t'J' ··1 'I' ~::¡ I,'" (' ,0 II' '
,/ .~ ,,::0 1 I '" '"" f '"" I .' '.- .......~__
I (1'1 t 'i .st 'I
COMMENTS /
._......._. .. __'_'.N..~Q ì_~_"_~N,__,:J-,-.,~j f Jd' _ .---.''---.,--.--.---...---........-~..-..-.-.--.-J j..r? ¿ _ ~r:,___
......-,...-......"-...-.-,,,.....-.. ...... ~ tr, ~,u. ~~._·..}R·'· ,.--Nn~....=-"t~.!:LºT:.~L..---~-\·..·.._'-,...··...__·_·_.._---,_·!:1·ï.LL1.ll:::::'...._,...
,........~....___..__.__,__..._~_~ &! 1...JJ,S.:.__, " ~".' ,._._~L!!l '1:.£:....__Uø.ll-_rJ..._.___..!J..t:1.'.rl:..J___........_....N.. '.' :J,~t.a&.L1J._......,"_
'Ç)¡.t~ tJf) ~ ~/ld'¡H~" llð;/qr (,o~~ ~..-- ¢.f /À'I/t/!J-
~
.............
. " "'V/. ""'~T ....
c.a ~ '3 I 1& r .... "--~---' .. v, ... . , . " . -"-"'-'--'~
, ;¿ Â.""'" u
~/lrJ ft'~jfollfJ- ~\JJ~:,) )."v~ ~~f~' ~¡I'IVLtf>
.sf' r~ <;.~"'- ' J ~CJþ
£poJt Lvtl1~ . J ~f)~ CIS'"
'5 (WI f... "'- M Itb '" frj C7~(.ll QJ "lqø~J# UM~
. ~ ,-~_...~_. '...~...._...,
.........., -., ..---.-....;,-,.... ,...
~
l
/~ ....,>.;t.;, '"{
(// ¡/ j (,../
q.r-~l~
9 r - ell
dlr-o t8
( qr- ~I~
\ 9,f--ò c8
~
...___.._.___..............-.._ N-'",
.__,.,___....___... _, ^v ..., "v'
Vies
r ves' no
~, ~--
~..no
Q ·1'"
, - _, .... - ... I·...., ......
Y ~ ~,_ t t\·n ,~i \1;:;' 1 b ~. &
d " t c h sam pi e s ( e q u,' r' e ( ?
Y"-
~
^A.
~
T
~Gì
'Ò rLi~ ~¥ t
Ù:r SÙt\"\)
M '^AJ_~"t~J ~
~ ~\'-'l (
II"" I" ~
'1,·\1 e 1 s 1 n com p 1 ,::1 n c i3 .... __. ^ . .
In,' t 'I' .31
COMMENTS (
.._..~..,.~_]J,c,., t\r~~~.~.. ,~~~ ~.. ~~..
............. ....,. ,'-'--""'---"
f'1",J Á¡ f&.f~:"lJ wJ.~
no
V '2': ;'5
<§d,..'\ . F~' ~ " ,:::1 '¡" v'::'. ,.......¡ ,)
.....,¡ ................ - ............1 It
_..
no
V le:3
"j e s c r' 'ï p t 'ï 0 n t" e c e ï 1,/ e d ,.~)
/j" n d r' :8 C e '1' V;3 d ?
Dli/O~~/9~)
L¡ YO. 8
·j805~'99L¡·O MD
07/D~)/9f::.
4, ",. 8
·1800-·7:~i.¡.3 T\¡'D
07/09,/'9b
T 1700-9940 MPT/GRCjEWR/CNP/RH08 1
C),1.¡./ 20/ 95
R '1 1 / '1 2 '''''02,/ '1 8/95 (c...0Wf)"'1 Fc",,-- )
o 6 / '1 ~2./ 9 b
t\.~ \ \~
L. 120,"'9Ql¡.0
,ò, r' e IN e I I t e ~B t s t" e qui' r' e d ?
¡
the we'll C 0 [". e d ?
- '11-1 ¡;;. / r;:: \'\1' C' /.' I,' (.. r,! n ;i 01 ('\ F L
'-'L1 t::: ~'\ I I.:~~ II n. .... I '...........1 ......
.~:; r, I,' E \,\,1 I'::, 4 /. (.. 1-.,) ("'I 1/ [I .; F L
v{:11~.,rr\. ~I(rr.. ........I.w, ..,..... ..
~() R t'·'1 /\ T I ()r-.J. L,OCi
~["LJ
D,'CI,.~ DG:IL.LING
~I']
~3F~/E\,\IF:4,/Ci\JO/:3FD L, 120-99/..¡.0 MD
o {¡....i 2 0 ,/ 9 r:,
() I.!. ,/ 2: iJ /' 9 5
O{¡./:20/9~)
DGR/EWR4/CNO/SFD L 120-7343 TVD
. f;f1 q 1\" .6. ì·· '[ ("'\"'.' l ¡,~,,'~
~ '-,J r:.. "1 r I '"........ ~ _ ....... .....1
[i/'!-,/20/9f:;
F: ......0 Sr~)'~ S~
L '1 2 0 ,... 8 9 h [I f\. \ ~ ~ .
Oh/2D,/95
ît!1 / :2 0/ S¡ ~::,
Da/24/9~,
F: 0
'~E' (', T (~I',·.:o ;:;;
~l:() ~ '".
~lD
r 0
L I~;
t)¡"~\" DITCHtf 929 S 'i800 .. DDL¡.() :;:;Stf929
.. ... '"
.., .....,. ',"" .... ".. .....
D ,.0'. T [m.P E C \l D
0: U j'-)
T D ,!.:J\ T .,6.,_Y 1_ U :3
.....' ..... .... ...... .... ...... ......., "'. ._ '..... ..... ... "" " ...s ".. ". ...... .....' ..... ." _.' ...' .... "'. ,., ._, .....' ...-
D þ,.¡",ù,
P3ge~
Date: 03/25/96
/\()GCC: I nd.'¡ ""i -\ cJ u'~~; I ~"J:~; I I
., .... I· I
~ :2 0 I 0 'J 1 C ,:.'! I r'1.3 t a 1"'1 as.. n ve , )1" V
f
(
JII\l,E¡ f.:;
d t" V
þ,t"e
95 'w 0 '18
~ - (', ·ID
{/.I9b~'. (;;>
n '-¡... n 'I 8
.::::~ ~ ~
I
ì
i
95-'O'I~3
SJ5"'018
95'wO'i~)
9~:""'018
D5·..·018
9 ~;.,. I] '1 t~
9 5, " Oi t~
9 i;i - 0 'j D
95 "0'1 U
.....~ ..... '''' .....' w. "~'" .., ___
PEpr'·'iIT
State of Alaska
Oil a.nd Gas Conservation Commission
3001 Porcupine Drive
Anchorage AK 99501-3192
The AOGCC releases confidential data to authorized ,employees of the Division of Oil and Gas (DNI~/DOG). Blueline logs and copied
reports are ~nventoried by prior to release. These confidentia~hen r onsibility ~e U~rSigne~ DkDOG employee.
Print Name (I ~ R '(.w, E.LÐ S ignatu(; / ~ ( . ~ Date. I¡ 'i/ c¡ 1,
PTe # q~- - ó I? WELL NAME 8-1 yJ L'IAL- Y-I A-
, { COMMENTS
\ -=ORM PAGES COMMENTS REPORTS PAGES
- ..
401 SURVEY
--..-- Description
403 CORE Analysis
Conventiional SW'C
407 DWOP
PICKS Formlation Picks or Producnon Tests
DSTs
Geological Markers
....
(
f
BLUE LINE . RUN INTERVAL SCALE NOTE
Mud log
rev 08/03/95 confidnr.doc
State of Alaska
Oil and Gas Conservation CommissicÞn
3001 Porcupine Drive
Anchorage AI< 99501-3192
The AOGCC releases confidential data t() authorized employees of the Division of Oil and Gas (DNRlDOG). Blueline logs and copied
reports are inventoried by prior to releaSE!. These confidential data are then responsibility of the undersigned DNRlDOG employee.
PTI:) # q ~- · 0 f õ
PAGE TWO IF NEEDED
WELL NAME: A J piV11L -#- l A
\
\
BLUE LINE
Mud log
RUN
INTERVAL
SCALE:
NOTE:
DIGITAL DATA RUIN INTERVAL O/C NOTE:
-~ ~ -
!1WD
~ )ct ~ '. o 'fÞ'- {VI y;~ (9 ~ l.J E.. {JJ A. J C.J\})O, Sf () I ~ b~ _
{ ~7~ > MwD
6~ Mfi; G V\L,~ t UJ '\ ()J ~ ~lio ß/ lto;O
rev 08/03/95 confidnr.doc
/---....
State of Alaska
Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage AK 99501-3192
The Oil and Gas Conservation Commission will release confidential data to authorized state etuployees
of the Departtnent of Natural Resources, Division of Oil and Gas (DNRJDOG). All data is to be copied
and inventoried. These copies and inventory are given to the DNRJDOG etl1ployee. The DNRJDOG
etnployee is then responsible for the data as it leaves the premises.
Well Pennit Nunlber
Df)---/?(
Well Name
11 ) ~ '; \-n ~ 1- A
Item
Fonn 407
PTD
F onnation Picks
Daily well operations
Su~ey
Core analysis
Core description
Production tests(DSTs)
r~\~~
£¡Jd lÁ//f/ Id7f'~5/ ltAt'. ~I
I
Pa~es
.......
Comment
2.---
-I
~3
r
No Ø\.E' Wt-.\
NON l5 "-VI\.!
NeNG ~VN
!..u( t7"hl/'j..~
/
/lPf.)ff
I Digital data
\Velllog Run #
ìvIud log
Intervals I Scale Cotnments
) ?-O - q q'/11 '2--
~~~\$~
f 2. () ~ q 9 ,/71 p)u S/«
I
I
D 6 n/~¿tJ (¿ ý /C¡VO/ !
()) PD
TI~e undersigt~RJDQG employee hereby acc~~e .ve list#nfi~ lata. n./
Prmtname I, vv-- KYHç:~ Sign \. _ '1 J:P~/
~~GCC en . e si~lbe~ ~date: óiß~
7:
¿¡
PLGGING & LOCATION CLEARANCE REPORT
state of Alaska ALASKA OIL & GAS CONSERVATION COMMISSION
PTD No. 9.5" -0 (?i
Lease AÞ~ 25"5;$ ()
Memorandum To File: API No.
Well Name
Operator
Location
$(J -/03 - 202.f( "01
/)0 ("rt p I-,/:¡
/fR.( n
5e<. J J f If tJ, It if E) U M
Spud: 2/18/9S-',
TD: 99'to
Abnd Date 310f f?.er
Completed -':?/Olf5'r
No'te casing size, w't, dep'th, cm't vol, & procedure.
Bfc Cse¡:
Long Cse¡:
f33f8 68 L -BO @ 17{> wi /OÚ 0 t~
. Liner:
Perf intervals - tops:
Review the well file, and comment on plugging, well head
status, and location clearance - provide loCo clear. code.
Plug.: 9?lfC"\ - 95""'39 w-f3CR- >-fo ./ l{roo - ltð~(C") c..Jj?o6 ~F--
$e+ ?:=-c."c- f- t<'If+ '¡> {r J ,2 'Z.. 0 a - 16 € r LAr( J.¡ Z S- ~ ~
Well head cut off: Þ It
Marker pos't or pla'te: )VA
Loca tion Clearance: A.rA-
CO~C1u..ion..: Ú.J eJl pPð(//J.'!1 ¡{(') J d
~c([€- fv.~tL a.$ Æf¡lk~ ,t .. er /I?( So 'CÒ -:¡ - ~O ZC( ....'o-a:,
, pro q,s--O"Zð
Code
:3
signedÆ3P~ {" ~ ' OQ
Date 7¡íO/9S-
I'oxm at A\g.n\lo-apfm, r.v5/2t/95
'--""" '-'.
"'"
-."
ARCO Alaska, Inc.
AtlanticRichfieldCompany
~~
~~
TO:
Alaska Oil & Gas Consveration Commission
Attn.: Robert P. Crandall
3001 Porcupine Dr.
Anchorage Alaska 99501
FROM:
Ms. Kelli A. Thibodeau A TO-1466
ARCO Alaska, Inc.
700 G. Street
Anchorage, Alaska 99510
(907) 265-6240
DATE:
July 5, 1995
I
0; < /\) t)
v 0\ ~0)
The enclosed MWD information has been reprocessed by Sperry for the Alpine 1A and Alpine
1 B wells. Please replace and destroy the information sent April 18, 1995. If you have any
questions please call me at (907) 265-6240.
Kelli
í
1 Sepia Copy Displayed by Sperry-Sun: tA (> \ R E eEl \I r D
Alpine 1 A-\;
DGR EWR4 ROP - 211 & 511 (1700' to 7340') TVD JUf' 09 1995
DGR EWR4 ROP - 211 & 511 (1700' to 9940') MD 4/aska Oil & Gas Cons. ,
AI· 1 8 A h ,-,v.oIII//SSlon
pine nc orage
DGR EWR4 ROP - 211 & 511 (1700' to 7500') TVD / (J
DGR EWR4 ROP - 2" & 5" (1700' to 8800') MD «.') ~
1 Paper Copy Displayed by Sperry Sun: c./
Alpine 1A (' /\ t
DGR EWR4 ROP - 211 & 511 (1700' to 7340') TVD Df)
DGR EWR4 ROP - 211 & 511 (1700' to 9940') MD \ I 0
Alpine 18 I V
DGR EWR4 ROP - 211 & 511 (1700' to 7500') TVD C1 ~
DGR EWR4 ROP - 211 & 511 (1700' to 8800') MD \
10F2
\{
c(/ .// /
~ 4:< G ~
TAPES:
Alpine 1 A
1 LDWG Formatted 611 Open Reel 1600 BPI Tape- MPT GRC EWR CNP SFD ROP
4/10/95 as Displayed by Sperry-Sun
1 Paper Copy LIS Verification Displa
( . Alpine 1B
~ I nWG Formatted 611 O~ eel 1600 BPI Tape- MPT GRC EWR CNP SFD ROP
41· s Display y Sperry-Sun
1 Paper Cop erification Displayed by sperry-su~ \
Ci\\ / ,(Jj\ r ('
\lo-~ ~ /~ ~/
<^- ¥ l' ~ À ~
\)'1 ~\'
f' D-
O
--- .-,...
ARCO Alaska, Inc.
AtlanticRichfieldCompany
TO:
Alaska Oil & Gas Consveration Commission
Attn.: Robert P. Crandall
3001 Porcupine Dr.
Anchorage Alaska 99501
DATE:
July 5, 1995
RETURN SIGNED COPY TO:
ARCO Alaska, Inc.
Attn.: Ms. Kelli A. Thibodeau-ATQ-1466/,
700 G. Street ,,/'
Anchorage, Alaska 99510-0360
(907) 265-6240 ,
Received by:
DATE:
~~'
,
20F2
.-'"
.-....,
~~
~~
FROM:
Ms. Kelli A. Thibodeau A TO-1466
ARCO Alaska, Inc.
700 G. Street
Anchorage, Alaska 99510
(907) 265-6240
l/7
v
y Sperry-Sun
~.
,roved for transmittal by:
!X~~ fjlff¡
F, M. u{;Jycutt
Manager, North A/ask~oration
)
ARCO Alaska Inc.
AtlanticRichfieldCompar )
~~
~,.
TmAN~MIITTAJ1
CONFIDENTIAL DATA
FROM: Sandra D. Lemke, AT01327 TO:
ARca Alaska, Inc.
P.O. Box 100360
Anchorage AK 99510-0360
Ak. Oil & Gas Conservation Comm.
A TTN: Larry Grant
3001 Porcupine Drive
Anchorage, Alaska 99510
RE: AOGCC data request: Confidential -formation logs for Alpine 1, 1A lB;
Fiord 3, 3A
DATE: 03/31/95
501032021100
501032021101
501032021102
Transmitted herewith is the followin11;:
Alpine #1 formation log '1' c.{ -I ~.~
Alpine #1A formation log l' )" - ( ~
Alpine #1 B formation log cr) -¿.. () ,
501032021000
501032021001
Fiord #3
Fiord #3A
formation log q L( ,.,1 1 J
formation log c¡ s: L/~
*1 SEPIA COpy each
* Note: no reproducibles received for EPOCH MWD COMBO (only the color versions from the Epoch report
are available.
CC: M. McDermott, Renee Hannon
Approved ~for transmittal by: c,,~:
Receipt: ~--? ~ r~9 0:IIe:
Return rec 0: ARCO Alaska, Inc.
. ATTN: S. Lemke, ATO-1327
700 G. Street
Anchorage, AK 99501
~
Prepared by: Sandra D. Lemke
AAI-Geophysical & Computer Services
RECEIVED
JUN 1 2 1995
Alaska OH & Gas Cons. COl1lmis-*n
Anchorage -
~
, "'-,
.--..,
ARCO Alaska, Inc.
AtlanticRichfieldCompany
~~
~~
TO:
Alaska Oil & Gas Consveration Commission
Attn.: Robert P. Crandall
3001 Porcupine Dr.
Anchorage Alaska 99501
FROM: Ms. Kelli A. Thibodeau A TO-1466
ARCO Alaska, Inc.
. 700 G. Street
Anchorage, Alaska 99510
(907) 265-6240
DATE: May 25, 1995
Transmitted herewith is the followinç, data concerning Alpine 1 1 A 1 B Fiord 3 & 3A:
REPORTS:
EPOCH WELL REPORTS
ALPINE1A .qr-~
ALPINE 1 B
FIORD 3
FIORD 3A
If you have any questions please call me at (907) 265-6240.
Kelli
RETURN SIGNED COPY TO:
ARGO Alaska, Inc.
Attn.: Ms. Kelli A. Thibodeau-ATO-1466
700 G. Street
Anchorage, Alaska 99510-0360
(907) 265-6240
Received by:
DATE:
Approved for transmittal by:
)tít¿¡(j .1J-ßdLf1H~tt7l fil{
F. M. eycutt
Manager, North Alaska xploration
RECEIVED
MAY 26 1995
Alaska Oil & Gas Coos. Commis_sJ~m
Anchorage
1 OF 1
('
('
("
;(
ARca ALASKA INC.
Alpine No. 1 A
Section 1- T11 N-R4E UM
Wildcat
Colville Delta
North Slope, Alaska
Epoch Well Logging, Inc.
RECEIVED
MAY 26 1995
,(
Alaska Oil & Gas Cons. CommissJo.n
Anchorage
r'~ i ~rrA~
'~) ~ ~ ~ \J~ ,""\ t_
(
(
(C
TABLE OF CONTENTS
(
1. Well Resume
2. Daily Chronology
3. Mud Record
4. Deviation Survey Record
5. Morning Reports
6. Drilling Curve
7. Formation log
8. MWD Combo log
(
L~
(
OPERATOR:
WELL NAME:
LOCATION:
FiElD:
COORDINATES:
ElEVATIONS:
COUNTY:
STATE:
API INDEX:
SPUD DATE:
TOTAL DEPTH:
COMPLETION DATE (T .0.):
CONTRACTOR:
RIG #:
RIG TYPE:
MUD PUMPS:
COMPANY GEOLOGISTS:
(
COMPANY ENGINEERS:
TOOLPUSHERS:
MUD COMPANY:
MUD ENGINEERS:
MUD TYPES:
HOLE SIZES:
CASING DATA:
MUDLOGGING SERVICES:
TYPE UNIT:
UNIT #:
LOGGING GEOLOGISTS:
SAMPLE TECHNICIANS:
ElECTRIC LOGS BY:
LOG INTERVALS:
DST INTERVALS:
CORED INTERVALS:
CORING COMPANY:
WELL STATUS:
(
("
("
WEll RESUME
ARCO ALASKA INC.
ALPINE NO. 1 A
SEC. 1 T11 N R4E. UM
COLVILLE DElTA
1465' FSL,22SO' PWL
R.K.B. = 40'
NORTH SLOPE BOROUGH
ALASKA
50-103-20211-01
FEBRUARY 1 7, 1995
9.940'
FEBRUARY 27, 1995
POOL ARCTIC ALASKA, INC.
NO.6
SCR DIESEL-ELECTRIC
(2) NATIONAL A1700 (6" X 12'1
JERRY VELDHUlS, RENEE HANNAN
GREG WILSON, PAUL DECKER
DON MCKElVEY / DAVE BAUMGARNER
GARY GOERlITCH / DARREll GREEN
BAROID DRILLING flUIDS. INC.
GARY MARTIN / SAM WILLIS
GEl/WATER TO 1785' / BLAND TO 9940' TO
26" TO 120', 16" TO 1785',8 1/2" TO 9940'
20" AT 120', 133/8" AT 1765'
EPOCH WElL LOGGING, INC.
(FID) GAS DETECTION. DML/ RIGWATCH
14
CRAIG SILVA. JOHN DIVINE
ROBERT ANDERSON. LARRY SHiElDS
NONE
NONE
NONE
NONE
NO DOPE. TIGHT HOLE
L~
(
2-17-95:
2-18-95:
2-19-95
2-20-95:
(
2-21-95:
2-22-95
2-23-95:
2-24-95:
2-25-95:
2-26-95:
2-27 -95:
2-28-95
(
("
(
DAIL Y CHRONOLOGY
ALPINE NO. 1A
Wait on cement and prepare to sidetrack. Test BOP's. Pick up BHA and lay
down drill pipe. RIH with RRB No.2, 12.25". Tag cement at 1605'.
Circulate bottoms up and pressure test the casing. Drill on plug.
Pressure test the casing. Drill cement from 1605' to 1800'. Circulate
bottoms up and POOH. Chanmge BHA and pick up mudmotor. RIH with NB
NO.5 and kick off cement at 1876' Drill to 2123' Displace mud in hole
with bland mud. Drill from 2123' to 23131.
Drill from 2313' to 3781'. Make 11 stand wiper trip. Drill from 3781' to
38741.
Drill from 3781' to 4874'. Circulate out and POOH. Change bit and RIH
with NB No.2. Drill from 4874' to 5225'.
Drill from 5225' to 6218'. Circulate out and POOH.
POOH. RIH with NB NO.3 and drill from 6218' to 69121.
Drill from 6912' to 7568'. Circulate out and POOH.
POOH and test BOP's. RIH with NB No.4 and new MWD (L WD) tool. Start
logging with LWD tool while reaming in from 4570'. Drill from 7568' to
7760'.
Drill from 7760' to 8185'. Circulate out and POOH. Remove Sperry Sun
neutron source. Change BHA and install new-kelly spinner. RIH with NB
NO.5. Place source in Sperry Sun tool. RIH to shoe and cut and slip the
drilling line.
Cut and slip the drilling line. Complete RIH and drill from 8185' to 9405'.
Drill from 9405' to 9940' (T.D.). Circulate bottoms up. Pull 12 joints of drill
pipe out of the hole and then ream the 12 joints back to bottom in a
controlled fashion for a M.A.D. run with the LWD tool. Circulate bottoms up
and POOH.
POOH. Stand back drill collars and heavy weight drill pipe. Make up mule
shoe. Pick up 34 joints of drill pipe and RIH. Circulate bottoms up and
circulate and condition mud while rigging up cementers. Lay P&A plug at
9940' to 9140'. Pull up and circulate and condition mud free of cement.
Lay down drill pipe while pulling up to second cementing point. Lay plug at
4700' to 4110'. Pull up and circulate and condition mud free of cement.
POOH. Pick up drill bit and lay down drill pipe while RIH. Stop at shoe and
wait on cement. Replace brake pads on drawworks.
(
('
(
MUD RECORD
ARCO ALASKA INC. ALPINE NO. 1 A
DATE DEPTH MW FV PV YP GELS FL SOL SD pH CI-
2-17-95 1625 10.3 37 15 7 7/37 7.6 11.0% TRC 11.1 1100
2-18-95 2337 10.0 62 19 14 3/11 6.2 10.0% NIL 10.6 700
2-19-95 3265 10.0 44 17 10 3/14 6.2 10.0% TRC 10.6 500
2-19-95 3843 10.1 45 19 22 5/19 6.0 10.0% TRC 10.2 500
2- 20-9 5 4814 10.1 42 10 11 2/6 5.8 11 .0% TRC 9.7 500
2-20-95 5215 10.0 39 12 10 2/5 5.8 10.0% TRC 9.7 500
2-21-95 5778 10.0 42 14 17 3/6 5.8 11.0% TRC 9.4 500
2-21-95 6218 10.0 42 13 14 3/7 5.6 11.0% TRC 9.2 500
2- 22-95 6430 10.2 42 14 13 3/7 5.6 13.0% TRC 9.1 500
2- 22-95 6900 10.1 39 12 14 4/8 5.4 12.0% TRC 8.8 500
2- 23-95 7568 10.0 40 11 14 3/8 5.6 10.0% TRC 8.9 500
( 2- 24-95 7750 10.1 41 13 16 4/11 5.6 11.0% TRC 9.6 400
2- 25-95 8185 10.2 42 10 16 3/0 5.4 12.0% TRC 9.2 400
2-26-95 9356 10.1 39 11 14 3/8 4.8 12.0% TRC 9.4 400
2-27-95 9940 10.1 40 12 14 4/8 4.6 12.0% TRC 9.1 400
(
'-
~.
/~.
.~
ARCO ALASKA INC.
SURVEY RECORD ALPINE NO. 1A
MEASURED INCLINATION AZIMUTH VERTICAL LATITUDE DEPARTURE VERTICAL
DEPTH DEPTH NIS, +1- EIW, +1- SECTION
(FEET) (DEGREE) (DEGREE) (FEET) (FEET) (FEET) (FEET)
140.86 0.31 89.36 140.86 0.00 0.39 -0.21
185.51 0.21 180.99 185.51 -0.08 0.51 -0.34
277.18 0.27 203.35 277.18 -0.44 0.42 -0.60 ".-...",
368.00 0.24 137.55 368.00 -0.78 0.46 -0.91
458.73 0.19 188.10 458.73 -1.07 0.57 -1.21
548.36 0.23 1 07.31 548.36 -1.27 0.72 -1.46
638.48 0.14 22.89 638.48 -1.22 0.94 -1.53
722.74 0.22 4.54 722.74 -0.97 0.99 -1.35
816.56 0.29 25.14 816.55 -0.57 1.10 -1.08
900.14 0.19 84.39 900.13 -0.37 1.33 -1.03
992.99 0.54 101.81 992.98 -0.44 1.91 -1.41
1084.37 0.73 105.38 1084.36 -0.68 2.89 -2.14
1179.92 0.86 113.46 1179.9 -1.13 4.13 -3.19
1274.18 0.89 118.92 1274.15 -1.76 5.42 -4.42
1367. 04 1.01 125.45 1366.99 -2.59 6.72 -5.82
1460.05 1.08 128.64 1459.99 -3.61 8.07 -7.41
1564.64 1.21 116.07 1564.56 -4.71 9.93 -9.28
1659.44 1.1 129.31 1659.34 -5.72 11 .43 -11.01
1752.44 1.24 124.48 1752.32 -6.86 12.95 -12.79
1876.45 1.39 133.31 1876.30 -8.65 15.15 -15.49 ~
1971.00 4.43 328.61 1970.77 -6.32 14.09 -12.95
2066.70 7.73 340.78 2065.92 2.91 10.04 -3.00
2157.68 10.75 340.99 2155.71 16.72 5.26 11.19
2251.36 13.88 337.04 2247.23 35.33 -1.97 30.75
2345.71 17.1 334.60 2338.14 58.29 -12.34 55.67
2437.76 19.76 329.47 2425.47 83.93 -26.05 84.64
2531.47 21.56 328.57 2513.15 112.26 -43.08 117.68
2625.73 23.37 329.34 2600.25 143.13 -61 .65 153.69
2720.38 24.85 324.95 2686.65 175.57 -82.65 192.33
2813.7 26.81 325.9 2770.64 209.05 -105.71 232.97
2907.98 28.95 323.68 2853.97 245.05 -131.15 277.01
/~
~~.
~
ARCOALASKA INC.
SURVEY RECORD ALPINE NO. 1A
MEASURED INCLINATION AZIMUTH VERTICAL LATITUDE DEPARTURE VERTICAL
DEPTH DEPTH NIS, +1- EIW, +/- SECTION
(FEET) (DEGREE) (DEGREE) (FEET) (FEET) (FEET) (FEET)
3002.12 32.11 323.93 2935.04 283.65 -159.38 324.75
3093.87 35.12 325.97 3011.44 325.24 -188.525 1375.50
3188.28 38.37 326.02 3087.08 372.06 1-220.12 431 .96 -...
3281.41 40.75 326.49 3158.87 421.38 -253.04 491.26
3374.57 43.81 325.94 3227.79 473.46 -287.89 553.92
3469.09 '46.60 327.11 3294.38 529.41 -324.87 620.98
3555.54 149.60 327.80 3352.11 583.65 -359.48 685.32
3639.60 49.84 326.17 3406.46 637.42 -394.42 749.44
3721.09 49.88 326.33 3458.99 689.21 -429.04 811 .73
3801.05 49.79 326.19 3510.56 740.03 -462.98 872.83
3876.24 49.89 327.03 3559.05 788.01 -494.60 930.29
3957.09 49.92 326.89 3611.13 839.85 -528.32 992.14
4042.69 49.93 326.14 3666.23 894.48 -564.46 1057.63
4108.54 49.86 327.18 3708.66 936.56 -592.14 1108.00
4191.70 49.90 327.94 3762.24 990.22 -626.25 1171.58
4273.66 49.80 327.88 3815.09 1043.30 -659.53 1234.22
4372.19 50.16 329.17 3878.46 1107.65 -698.92 1309.66
4470.69 50.17 328.47 3941.55 1172.36 -738.08 1385.26
4536.37 5.033 328.40 3983.55 1215.39 -764.51 1435.75
4564.59 50.25 328.43 4001.58 1233.88 -775.88 1457.45 ..-.....
4655.12 50.12 328.26 4059.55 1293.07 -812.38 1526.97
4691.05 50.09 327.72 4082.59 1316.45 -826.99 1554.53
4749.35 50.03 327.94 4120.02 1354.28 -850.79 1599.23
4815.54 49.89 328.02 4162.61 1397.25 -877.65 1649.90
4843.16 49.81 327.58 4180.42 1415.11 -888.90 1671.01
. 4937.79 49.65 326.95 4241.58 1475.85 -927.95 1743.21
4961.82 49.46 328.20 4257.17 1491.29 -937.75 1761.50
5056.98 49.16 326.17 4319.22 1551.92 -976.85 1833.65
5119.88 49.23 327.42 4360.32 1591.76 -1002.92 1881.26
5135.60 49.06 326.94 4370.60 1601.75 -1009.36 1893.15
5190.27 48.92 326.56 4406.48 1636.25 -1031.98 1934.40
~"
~-"
,..-...\
ARCO ALASKA INC.
SURVEY RECORD ALPINE NO. 1A
MEASURED INCLINATION AZIMUTH VERTICAL LATITUDE DEPARTURE VERTICAL
DEPTH DEPTH NIS, +/- EIW, +1- SECTION
(FEET) (DEGREE) (DEGREE) (FEET) (FEET) (FEET) (FEET)
5253.35 49.65 325.45 4447.63 1675.89 -1058.72 1982.20
5337.93 49.20 327.18 4502.64 1729.34 -1094.35 2046.43
5410.22 51.39 327.33 4548.82 1776.12 -1124.43 2102.04 ~,
5503.82 50.87 326.83 4607.56 1837.29 -1164.03 2174.92
5559.25 50.68 326.84 4642.61 1873.24 -1187.52 2217.86
5595.97 50.43 325.90 4665.94 1896.85 -1203.23 2246.21
5691.04 50.17 325.96 4726.66 1957.44 -1244.21 2319.34
5721.44 50.42 326.32 4746.08 1976.86 -1257.24 2342.73
5814.69 51.95 327.88 4804.53 2037.87 -1296.69 2415.38
5900.1 0 51.45 325.60 4857.47 2093.91 -1333.44 2482.40
5970.23 51.08 325.94 4901.35 2139.14 -1364.21 2537.09
6065.98 50.54 325.97 4961.86 2200.63 -1405.76 2611.28
6128.27 50.30 326.58 5001.55 2240.56 -1432.41 2659.28
6156.53 50.37 327.35 5019.59 2258.80 -1444.27 2681.04
6252.58 50.45 325.64 5080.80 2320.51 -1485.13 2755.05
6350.09 51.09 325.33 5142.47 2382.75 -1527.92 2830.54
6377.43 51.34 325.34 5159.60 2400.28 -1504.04 2851.85
6532.42 52.13 327.67 5255.58 2501.76 -1607.19 2973.52
6630.30 52.52 329.17 5315.41 2567.75 -1647.76 3050.97
6709.16 52.87 329.52 5363.20 2621.71 -1679.74 3113.65 --..,
6789.95 53.14 329.10 5411.82 2677.20 -1712.67 3178.13
6866.43 51.86 328.86 5458.37 2729.20 -1743.94 3238.77
6883.50 51.88 328.48 5468.91 2740.67 -1750.92 3252.19
6977.87 51.87 327.79 5527.18 2803.72 -1790.11 3326.42
7022.26 50.23 327.60 5555.08 2832.90 -1808.56 3360.94
7070.79 49.98 327.07 5586.21 2864.25 -1828.65 3398.17
7095.63 50.05 328.07 5602.17 2880.31 -1838.86 3417.20
7132.33 50.33 326.78 5625.67 2904.06 -1854.04 3445.39
7215.71 51.03 328.05 5678.50 2958.11 -1889.24 3509.90
7314.53 51.54 326.64 5740.31 3022.67 -1931.41 3587.00
7415.53 51.97 326.32 5802.83 088.80 -1975.21 3666.32
~~",>,,-
.:¡ ___ -"'3
~¿;-:-~--
r--=~
~
,~
~-,
~,
ARCO ALASKA INC.
SURVEY RECORD ALPINE NO. 1A
MEASURED INCLINATION AZIMUTH VERTICAL LATITUDE DEPARTURE VERTICAL
DEPTH DEPTH NIS, +1- EIW, +1- SECTION
(FEET) (DEGREE) (DEGREE) (FEET) (FEET) (FEET) (FEET)
7489.60 52.32 328.29 5848.29 3138.01 -2006.80 3724.80
7575.36 52.66 328.52 5900.51 3195.95 -2042.44 3792.81
7668.88 53.41 326.73 5956.74 3259.05 -2082.46 3867.52 -.........
7760.98 54.15 327.27 6011.16 3321.36 -2122.93 3941.82
7854.03 54.56 327.76 6065.38 3385.15 -2163.54 4017.44
7954.38 55.04 327.69 6123.23 2454.48 -2207.33 4099.44
8048.26 55.44 327.49 6176.75 3519359 -2248.67 4176.56
8104.57 55.13 326.43 6208.82 3558.39 -2273.91 4222.85
8165.37 55.67 326.62 6243.34 3600.14 -2301.51 4272.89
8257.98 55.43 325.89 6295.72 3663.65 -2343.93 4349.26
8351.87 55.27 327.10 6349.10 3728.05 -2386.57 4426.49
8452.73 55.03 326.91 6406.73 3797.47 -2431.64 4509.26
8546.57 54.40 327.41 6460.94 3861.83 -2473.18 4585.86
8638.89 54.07 327.17 6514.89 3924.87 -2513.66 4660.78
8731.44 53.51 327.27 6569.56 3987.65 -2554.09 4735.45
8826.06 52.85 327.21 6626.26 4051.35 -2595.08 4811 .19
8920.03 52.22 328.61 6683.42 4114.53 -2634.71 4885.77
9013.68 51 .49 329.11 6741.25 4177.58 -2672.80 4959.39
9099.69 51.32 328.91 6794.9 4235.21 -2707.41 5026.59
9192.81 50.77 327.37 6853.45 4296.71 -2745.63 5098.98 r___
9286.82 50.25 327.99 6913.24 4358.02 -2784.42 5171.53
9380.94 49.85 328.07 6973.67 4419.23 -2822.62 5243.68
9474.23 49.49 328.03 7034.05 4479.57 -2860.26 5314.78
9567.92 48.97 328.10 7095.23 4539.78 -2897.79 5385.73
9660.14 48.70 328.85 7155.94 4598.96 -2934.09 5455.13
9753.91 48.21 331.18 7218.13 4659.74 -2969.16 5525.22
9846.97 47.76 329.70 7281.42 4719.87 -3003.27 5594.24
9940.00 47.76 329.70 7342.96 4779.34 -3038.01 5663.05
EtJCH WELL LOGGING, If 2.
MORNING REPORT
( ARCO ALASKA, INC. ALPINE #lA
Date: 2-17-95 Time: 04:00 Last Casing: 13 3/811 at 1765'
04:00 Depth: 1623' YESTERDAY: 24 Hour Progress:
Estimated Pore Pressure: 9.1 ppg DC Exponent: NIA
ROP Sand: ftIhr ROP Shale: ftIhr
BIT INFORMATION:
No. Size Type SIN Jets Interval Ftg. Hours Condition
2RR 8.5" STC FDGHC NC0904 Open 1665'- In Hole
DRILLING PARAMETERS: HIGH LOW AVERAGE
Rate of Penetration at at ftIhr
Torque at at amp
Weight on Bit at at Klbs
Rotary RPM at at rpm
Pump Pressure at at psi
DRILLING MUD REPORT: Report Depth: 3100'
MW 10.4 VIS 40 PV 13 YP 10 GELS 2/14 FL 6.6 FC 2
SOL 13.5 OIL 0 SD Tr MBT pH 9.3 CI- 1100 Ca+ 100
GAS SUMMARY: HIGH LOW AVERAGE
Total Ditch Gas (units) 89 at 1623 0.4 at 11.0 units
Total Cuttings Gas (units) at at units
( Methane (C-1) (ppm) at at ppm
Ethane (C-2) at at ppm
Propane (C-3) at at ppm
Butane (C-4's) at at ppm
Pentane(C-5's) at at ppm
Background Gas: 7 units Trip Gas: 75 units at 1605'
Connection Gas: units at Wiper Gas: units at
OIL SHOWS:
LITHOLOGY:
DAILY ACTIVITY SUMMARY: Wait on cement and prepare to sidetrack; test BOP's; pickup BHA;
lay down drill pipe; RIH with RRB #2, 12.25"; tag cement at 1605'; circulate bottoms up; pressure test the
casing; drill on plug.
REMARKS: .Note live oil observed in the mud while circulating up the first returns after tagging the cement.
SERVICES PROVIDED: DML MUDLOGGING and RIGWATCH MONITORING SYSTEM
Epoch Personnel on site: 4 Arco Alaska Reps: Don McKelvey /Dave Bumgarner Report By: Craig Silva
(
Eí JCH WELL LOGGING, If' n
~.
MORNING REPORT
(' ARCa ALASKA, INC. ALPINE #lA
Date: 2-18-95 Time: 04:00 Last Casing: 13 3/8" at 1765'
04:00 Depth: 2343' YESTERDAY: 1597' 24 Hour Progress: 746'
Estimated Pore Pressure: 9.1 ppg DC Exponent: 0.58
ROP Sand: ftIhr ROP Shale: 133 ftIhr
BIT INFORMATION:
No. Size Type SIN Jets Interval Ftg. Hours Condition
2RR 12.25" STC FDGHC NC0904 Open 1597'-1800' 203' 7.0 NR
5 8.5" HTC AT J-P05 V73BH 2-14,1-13 1800'- In Hole
DRILLING PARAMETERS: HIGH LOW AVERAGE
Rate of Penetration 327.3 at 2099' 20.9 at 1813' 133.0 ftIhr
Torque 135 at 2035' 0 at 2015' 71 amp
Weight on Bit 17 at 2012' 0.2 at 2068' 8 Klbs
Rotary RPM 343 at 2016' 254 at 1906' 39 rpm
Pump Pressure 2086 at 2012' 1597 at 1817' 1865 psi
DRILLING MUD REPORT: Report Depth: 1625'
MW 10.3 VIS 37 PV 15 YP 7 GELS 7/37 FL 7.6 FC 2
SOL 11.0 OIL Tr SD Tr MBT pH 11.1 CI- 1100 Ca+ 80
GAS SUMMARY: HIGH LOW AVERAGE
Total Ditch Gas (units) 28.5 at 1849' 3.0 at 1806' 10.1 units
( Total Cuttings Gas (units) 44 at 2040' 18 at 1920' 29.2 units
Methane (C-1) (ppm) 5700 at 1849' 600 at 1806' 2021 ppm
Ethane (C-2) at at ppm
Propane (C-3) at at ppm
Butane (C-4's) at at ppm
Pentane(C-5's) at at ppm
Background Gas: 7 units Trip Gas: 43 units at 1800'
Connection Gas: units at Wiper Gas: 59 units at 2123'
OIL SHOWS:
LITHOLOGY: Claystone 55% Shale 35% Tuff(Bentonite) 10%
DAILY ACTIVITY SUMMARY: Pressure test the casing; drill cement from 1605' to 1800'; circulate
bottoms up; POOH; change BHA; pickup mudmotor; RIH with NB #5; kick off cement at 1876'; drill to
2123'; diplace mud in hole with bland mud; drill from 2123' to report depth.
REMARKS: .Note live oil observed in the mud while circulating up the first returns after tagging the cement,
and continuing in the mud for 2 hours while slowly decreasing. Appeared to be old oil ( highest ppm amount of
the chromatograph breakdown was butane, followed by successively lower amounts of the lighter gases, with
methane being the lowest).
SERVICES PROVIDED: DML MUDLOGGIN'G and RIGWATCH MONITORING SYSTEM
Epoch Personnel on site: 4 Arco Alaska Reps: Don McKelvey/Dave Bumgarner Report By: Craig Silva
(
r (
( ,
EPOCH WELL LOGGING, INC.
~fOR~rmG REPORT
(
ARCO AL..t\SKA.. INC.
¿4LPINE #1¿t\
Date: 2-19-95
04:00 Depth: 3874'
Time:
YESTERDAY:
04:00
2313'
Last Casing: 13 3/8" at 1765'
24 Hour Progress: 1561'
Estimated Pore Pressure: 9.2ppg DC Exponent: 1.11
ROP Sand: 175 ft'hr ROP Shale: 136 ft'hr
BIT INFORMATION:
No. SÎze Type SIN Jets Interval Ftg. Hours Condition
1 8.5 HTC AT J-P05 V73BH 2-14,1-13 1800; - In Hole
DRILLING PARAMETERS: HIGH LOW AVERAGE
Rate of Penetration 360.0 at 2438' 26.3 at 2470' 139.1 ftIhr
Torque 229 at 2902; 0 at 3561' 115 amp
Weight on Bit 23 at 3560' 1.0 at 3194' 9 K/bs
Rotary RPM 319 at 2843' 191 at 2344' 280 rpm
Pump Pressure 2233 at 3211' 1282 at 2341' 1845 psi
DRILLING ~fUD REPORT: Report Depth: 3870·
MW 10.0 VIS 41 PV yp GELS FL FC 2
SOL OIL SD MBT pH CI- Ca+
GAS SIfML\1ARY: HIGH LOW AVERAGE
( Total Ditch Gas (units) 440.0 at 24381 6.0 at 2694' 21.0 units
Total Cuttings Gas (units) 160 at 2460' 20 at 2880' 66.9 units
Methane (C-1) (ppm) 74005 at 2438' 847 at 2502' 3701 ppm
Ethane (C-2) 3850 at 2438' 0 at 2171' 156 ppm
Propane (C-3) 1656 at 2438' 0 at 2224' 60 ppm
Butane (C-4's) 704 at 2438' 0 at 3061' 25 ppm
Pentane(C-5's) 102 at 2438' 0 at 1 ppm
Background Gas: 6 units Trip Gas: 43 units at 1800'
Connection Gas: units at Wiper Gas: 345 units at 3780'
OIL SH"O\\'S:
LITHOLOGY: Mudstonelclaystone/siltstone 70% Shale 15%
Tuff(Bentonite) 5% Sand 10%·
DAILY ACTIVITY SU~1MA1{Y: Drill from 2343' to to 3781'; do 11 stand wiper trip; drill fiOm3781' to
report depth.
I{.I£l\1Al~l(S: ..
SERVICES PROVIDED: DML MUDLOGGING and RIGW ATCH MONITORING SYSTEM
Epoch Personnel on site: 4 /\rco 1\laslm Reps: Don McKelvey/Dave Bum~arner Report By: Cr::uf'; Silva
(
( (
EPÚCH WELL LOGGING, INC.
MORNING REPORT
(' ARCO ALASKA, INC. ALPINE #lA
Date: 2-20-95 Time: 04:00 Last Casing: 13 3/8" at 1765'
04:00 Depth: 5225' YESTERDAY: 3874' 24 Hour Progress: 1351'
Estimated Pore Pressure: 9.2ppg DC Exponent: 1.40
ROP Sand: 220 ftIhr ROP Shale: 110 ftIhr
BIT INFORMATION:
No. Size Type SIN Jets Interval Ftg. Hours Condition
1 8.5" HTC AT J-P05 V73BH 2-14,1-13 1800' -4874' 3074' 28.70 2-E-ln
1 8.5" HYCALOG DS40HF 16095 2-12,1-11 4874' - In Hole
DRILLING P ARAlVlETERS: HIGH LOW AVERAGE
Rate of Penetration 257.1 at 4401' 41.9 at 3919' 116.6 ftIh r
Torque 219 at 4873' 122 at 4123' 182 amp
Weight on Bit 15 at 4810' 5 at 4413' 11 Klbs
Rotary RPM 329 at 4820' 239 at 3802' 306 rpm
Pump Pressure 2353 at 3792' 1454 at 3802' 2067 psi
DRILLING :MUD REPORT: Report Depth: 4874'
MW 10.1 VIS 42 PV 10 YP 11 GELS 2/15 FL 5.8 FC 2
SOL 11.0 OIL 0 SD Tr MBT 26.0 pH 9.7 CI- 500 Ca+ 40
( GAS SUMMARY: HIGH LOW AVERAGE
Total Ditch Gas (units) 388.0 at 4633' 7.0 at 4264' 34.1 units
Total Cuttings Gas (units) 92 at 4320' 15 at 3840' 55.5 units
Methane (C-1) (ppm) 53297 at 4633' 1121 at 4264' 5172 ppm
Ethane (C-2) 4860 at 4633' 100 at 4426' 360 ppm
Propane (C-3) 3576 at 4633' 36 at 4527' 213 ppm
Butane (C-4's) 2144 at 4633' 9 at 4197' 113 ppm
Pentane(C-5's) 532 at 4633' 0 at 20 ppm
Background Gas: 7 units Trip Gas: 23 units at 4874'
Connection Gas: units at Wiper Gas: units at
OIL SHOWS: Various small trace shows throughout interval, but Good to fair show at 4600-4780; visible oil
in the mud, good petroleum odor; good fluorescence; straw cuts in plain light; light brown residual ring in
plain light.
LITHOLOGY:
Mudstone/claystone/siltstone 30%
Tuff/tuffaceous claystone 13%
Shale 45%
Sand 12%
DAILY ACTIVITY SUMMARY: Drill from 3781' to 4874'; circulate out; POOH; change bit; RIH with
NB #2; drill from 4874' to report depth.
REMARKS:..
SERVICES PROVIDED: DML MUDLOGGING and RIGW ATCH MONITORING SYSTEM
Epoch Personnel on site: 4 Arco Alaska Reps: Don McKelvey/Dave Bumgarner Report By: Craig Silva
(
(' (
EPOCH WELL LOGGING, INC.
~10RNING REPORT
("
ARCO ALASKA, INC.
ALPINE #lA
Date: 2-21-95
04:00 Depth: 6218'
Time:
YESTERDAY:
04:00
5225'
Last Casing: 133/8" at 1765'
24 Hour Progress: 993'
Estimated Pore Pressure: 9.2ppg DC Exponent: 0.93
ROP Sand: 150 ftlhr ROP Shale: 113 ftlhr
BIT INFORMATION:
No. Size Type SIN Jets Interval Ftg. Hours Condition
2 8.5" HYCALOG DS40HF 16095 2-12,1-11 4874' -6218' 1344' 15.58 2-2-CT-N-EF-I-NB
DRILLING PARAMETERS: HIGH lOW AVERAGE
Rate of Penetration 327.1 at 5279' 6.0 at 5751' 114.0 ftlhr
Torque 319 at 5280' 0 at 6197' 219 amp
Weight on Bit 21 at 6197' 0.8 at 5224' 3 Klbs
Rotary RPM 325 at 4931' 245 at 6142' 305 rpm
Pump Pressure 2714 at 5280' 1906 at 5751' 2148 psi
DRILLING MUD REPORT: Report Depth: 6218'
MW 10.0+ VIS 42 PV 13 YP 14 GELS 3/7 Fl 5.6 FC 2
SOL 11.0 Oil 0 SO Tr MBT 30.0 pH 9.2 CI- 500 Ca+ 40
GAS SUMMARY: HIGH lOW AVERAGE
( Total Ditch Gas (units) 40.0 at 5357' 5.0 at 5690' 13.3 units
Total Cuttings Gas (units) 44 at 5520' 10 at 5760' 22.8 units
Methane (C-1) (ppm) 7531 at 5355' 838 at 5690' 2394 ppm
Ethane (C-2) 407 at 5490' 26 at 6183' 108 ppm
Propane (C-3) 87 at 5490' 3 at 6183' 27 ppm
Butane (C-4's) 45 at 5039' 0 at 0 ppm
Pentane(C-5's) 0 at 0 at 0 ppm
Background Gas: 6 units Trip Gas: 23 units at 4874'
Connection Gas: units at Wiper Gas: units at
OIL SHOWS: None
LITHOLOGY:
Mudstone/claystone/siltstone 48%
Tuff/tuffaceous claystone 5%
Shale 45%
Sand 2%
DAILY ACTIVITY SUMMARY: Drill from 5525' to 6218'; circulate out; POOH.
REMARKS:..
SERVICES PROVIDED: DML MUDLOGGING and RIGW ATCH MONITORING SYSTEM
Epoch Personnel on site: 4 Arco Alaska Reps: Don McKelvey/Dave Bumgarner Report By: Craig Silva
(
( (
EPOCH WELL LOGGING, IN"C.
MORNING REPORT
(
ARCO ALASKA, INC.
ALPINE #lA
Date: 2-22-95
04:00 Depth: 6912'
Time:
YESTERDAY:
04:00
6218'
Last Casing: 13 3/8" at 1765'
24 Hour Progress: 694'
Estimated Pore Pressure: 9.2ppg DC Exponent: 1.05
ROP Sand: 87 ftIhr ROP Shale: 55 ftIhr
BIT INFORMATION:
No. Size Type SIN Jets Interval Ftg. Hours Condition
3 8.5" HTC AT J-P05 V81 BH 3-13's 6218' - In Hole
DRILLING PARAMETERS: HIGH LOW AVERAGE
Rate of Penetration 180.0 at 6243' 17.2 at 6821' 55.8 ftIh r
Torque 313 at 6312' 0 at 6844' 277 amp
Weight on Bit 25 at 6453' 7 at 6219' 17 Klbs
Rotary RPM 334 at 6447' 252 at 6844' 320 rpm
Pump Pressure 2937 at 6453' 2016 at 6219' 2738 psi
DRILLING MUD REPORT: Report Depth: 6453'
MW 10.2+ VIS 42 PV 14 YP 13 GELS 3/7 FL 5.6 FC 2
SOL 13.0 OIL 0 SO Tr MBT 31.0 pH 9.1 CI- 500 Ca+ 40
GAS SUMMARY: HIGH LOW AVERAGE
Total Ditch Gas (units) 40.0 at 6251' 7.0 at 6822' 18.9 units
( Total Cuttings Gas (units) 26 at 6420' 3 at 6540' 13.1 units
Methane (C-1) (ppm) 8010 at 6227' 1222 at 6832' 3473 ppm
Ethane (C-2) 244 at 6251' 38 at 6674' 95 ppm
Propane (C-3) 117 at 6525' 17 at 6705' 35 ppm
Butane (C-4's) 35 at 6227' 3 at 6727 12 ppm
Pentane(C-5's) 0 at 0 at 0 ppm
Background Gas: 7 units Trip Gas: 245 units at 6218'
Connection Gas: units at Wiper Gas: units at
OIL SHOWS: None
LITHOLOGY: Mudstone/claystone/siltstone 58% Shale 35%
Tuff/tuffaceous claystone 4% Sand 3%
DAILY ACTIVITY SUMMARY: POOH; RIH with NB #3; drill from 6218' to report depth.
REMARKS:..
SERVICES PROVIDED: DML l\1UDLOGGING and RIGW ATCH MONITORING SYSTEM
Epoch Personnel on site: 4 Areo Alaska Reps: Don McKelvey/Dave Bwngarner Report By: Craig Silva
(,
{ (
EPOCH WELL LOGGING, INC.
!\10RNING REPORT
(
ARCO ALASKA, INC.
ALPINE #lA
Date: 2-23-95
04:00 Depth: 7568'
Time:
YESTERDAY:
04:00
6912'
Last Casing: 13 318" at 1765'
24 Hour Progress: 656'
Estimated Pore Pressure: 9.2ppg DC Exponent: 1.60
ROP Sand: 75 fUhr ROP Shale: 44 fUhr
BIT INFORMATION:
No. Size Type SIN Jets Interval Ftg. Hours Condition
3 8.5" HTC AT J-P05 V81BH 3-13's 6218' -7568' 1350' 30.46 In Hole
DRILLING PARAMETERS: HIGH LOW AVERAGE
Rate of Penetration 85.7 at 7212' 19.4 at 7162' 45.0 fUhr
Torque 341 at 7491' 0 at 7193' 274 amp
Weight on Bit 33 at 7192' 9 at 7105' 21 Klbs
Rotary RPM 336 at 6866' 214 at 7169' 309 rpm
Pump Pressure 2744 at 6845' 2077 at 7169' 2546 psi
DRILLING MUD REPORT: Report Depth: 7568'
MW 10.0 VIS 40 PV 11 YP 14 GELS 3/8 FL 5.6 FC 2
SOL 10.0 OIL 0 SO Tr MBT 33.0 pH 8.9 CI- 500 Ca+ 40
GAS SUMMARY: HIGH LOW AVERAGE
Total Ditch Gas (units) 25.5 at 7554' 7.0 at 6980' 13.9 units
( Total Cuttings Gas (units) 20 at 7560' 3 at 7080' 11.2 units
Methane (C-1) (ppm) 4500 at 7554' 1154 at 6980' 2408 ppm
Ethane (C-2) 342 at 7554' 53 at 6985' 128 ppm
Propane (C-3) 101 at 7397' 13 at 6965' 53 ppm
Butane (C-4's) 30 at 7554' 1 at 7191 10 ppm
Pentane(C-5's) 0 at 0 at 0 ppm
Background Gas: 14 units Trip Gas: 245 units at 6218'
Connection Gas: units at Wiper Gas: 42 units at 7161'
OIL SHOWS: None
LITHOLOGY: Mudstone/claystone/siltstone 58% Shale 33%
Tuff/tuffaceous claystone 5% Sand 4%
DAILY ACTIVITY SUMMARY: Drill from 6912' to 7568'; circulate out; POOH.
RElVlARKS: ..
SERVICES PROVIDED: DML MUDLOGGING and RIGW ATCH MONITORING SYSTEM
Epoch Personnel on site: 4 Arco Alaska Reps: Don McKelvey/Dave Bumgarner Report By: Craig Silva
(
( (
EPOCH WELL LOGGING, IN"C.
MORNING REPORT
(
ARCO ALASKA, INC.
Date: 2-24-95
04:00 Depth: 7760'
Time:
YESTERDAY:
ALPINE #lA
04:00
7568'
Last Casing: 13 3/8" at 1765'
24 Hour Progress: 192'
Estimated Pore Pressure: 9.2ppg DC Exponent: 1.00
ROP Sand: 75 ftIhr ROP Shale: 44 ftIhr
BIT INFORM\.TION:
No. Size Type SIN
3 8.5" HTC ATJ-P05 V81BH
4 8.5" BHI R417G 0118234
DRILLING PARAMETERS:
Rate of Penetration 94.7
Torque 409
Weight on Bit 19
Rotary RPM 317
Pump Pressure 2781
DRILLING MUD REPORT:
MW 10.1 VIS 41 PV
SOL 11.0 OIL 0 SO
(
GAS STJMMARY:
Total Ditch Gas (units)
Total Cuttings Gas (units)
Methane (C-1) (ppm)
Ethane (C-2)
Propane (C-3)
Butane (C-4's)
Pentane(C-5's)
Background Gas:
Connection Gas:
HIGH
25.5 at
18 at
1 0063 at
582 at
289 at
1 05 at
30 at
14
units
units at
HIGH
at
at
at
at
at
Jets
3-13' s
5-10's,1-9
7582'
7570'
7598'
7645'
7619'
Interval
6218' -7568'
7568' -
1.6
328
6
299
2146
LOW
at
at
at
at
at
7554'
7650'
7607'
7607'
7607'
7607'
7607'
Report Depth: 7750'
13 YP 16
Tr MBT 31.0
Ftg. Hours Condition
1350' 30.46 2-3-NO-A-E-ln-NO-HRS
In Hole
7570'
7599'
7639'
7586'
7571'
FL
CI-
6980'
7620'
7640'
7640'
7569'
7569
7569
AVERAGE
57.0 ftIhr
354 amp
12 Klbs
308 rpm
2623 psi
5.6
400
FC
Ca+
2
40
GELS 4/11
pH 9.6
LOW
7.0 at
14 at
2152 at
11 0 at
58 at
14 at
o at
Trip Gas:
Wiper Gas:
AVERAGE
13.9 units
15.9 units
4496 ppm
236 ppm
119 ppm .
35 ppm
8 ppm
110 units at 7568'
42units at 7161'
OIL SHO\VS: Trace show at 7580 to 7600; tr-5% dull yellow sample fluorescence; slow dull greenish
yellow cut fluorescence with spotty very slow streaming; dull yellowish gold residual ring.
LITHOLOGY:
Mudstone/claystone/siltstone 30%
Tuff/Calcareous tuff 7%
Shale 35%
Sand 28%
DAILY ACTIVITY STJMMARY: POOH; test BOP's; RIH with NB #4 and new MWD(LWD) tool; start
logging with LWD tool while reaming in from 4570'; drill from 7568' to report depth.
REMARKS:..
SERVICES PROVIDED: DML MUDLOGGING and RIGW ATCH MONITORING SYSTEM
Epoch Personnel on site: 4 Arco Alaska Reps: Don McKelveyJDave Bmngarner Report By: Craig Silva
(
( (
EPOCH WELL LOGGING, INC.
MORNING REPORT
(0
ARCO ALASKA, INC.
ALPINE #lA
Date: 2-25-95
04:00 Depth: 8185'
Time:
YESTERDAY:
04:00
7760'
Last Casing: 13 3/8" at 1765'
24 Hour Progress: 425'
Estimated Pore Pressure: 9.2ppg DC Exponent: 0.92
ROP Sand: 67 ftIhr ROP Shale: 54 ftIhr
BIT INFORMATION:
No. Size Type SIN Jets Interval Ftg. Hours Condition
4 8.5" BHI R417G 0118234 5-1 O's, 1-9 7568' -8185' 617' 14.07 1-1-BU-A-X-1/16-PR
DRILLING PARAMETERS: HIGH LOW AVERAGE
Rate of Penetration 94.7 at 7895' 7.1 at 8076' 56.3 ftIh r
Torque 429 at 8185' 0 at 8176' 349 amp
Weight on Bit 28 at 7892' 3 at 8077' 8 Klbs
Rotary RPM 458 at 8146' 247 at 8174' 319 rpm
Pump Pressure 3275 at 8065' 2080 at 8104' 2923 psi
DRILLING MUD REPORT: Report Depth: 7858'
MW 10.1 VIS 42 PV 11 YP 15 GELS 4/12 FL 5.6 FC 2
SOL 11.0 OIL 0 SD Tr MBT 32.0 pH 8.9 CI- 400 Ca+ 40
GAS SUMMARY: HIGH LOW AVERAGE
Total Ditch Gas (units) 42.0 at 8056' 6.0 at 7892' 14.9 units
( Total Cuttings Gas (units) 21 at 8130' 8 at 7770' 13.8 units
Methane (C-1) (ppm) 5964 at 8056' 1017' at 7892' 2414 ppm
Ethane (C-2) 398 at 8056' 61 at 7753' 133 ppm
Propane (C-3) 321 at 8056' 27 at 7892' 82 ppm
Butane (C-4's) 137 at 8056' 8 at 7753' 35 ppm
Penta ne(C-5's) 26 at 8056' 2 at 7948' 5 ppm
Background Gas: 8 units Trip Gas: 11 0 units at 7568'
Connection Gas: units at Wiper Gas: 42 units at 7161'
OIL SHOWS: Nearly continuous trace show in sandstones through the entire report interval; occ the show
is improved to poor; in general the sandstone usually has some clay or silt in the supporting matrix and the
visible porositiesare mostly poor; predominantly trace to 5% dull yellow sample fluorescence; slow dull
greenish yellow cut fluorescence with spotty very slow streaming; dull yellowish gold residual ring; some of
the friable cleanest looking sandstones have light brown oil staining, pale to moderately bri yellow to whitish
yellow cut fluorescence with slow wispy streaming, and moderately bright yellow residual ring fluorescence.
LITHOLOGY:
Mudstone/claystone/siltstone 40%
Tuff/Calcareous tuff 3%
Shale 39%
Sand 18%
DAILY ACTIVITY SUMMARY: Drill from 7760' to 8185'; circulate out; POOH; remove Sperry
neutron source; change BHA; install new kelly spinner; RIH with NB #5; place source in Sperry LWD tool;
RIH to shoe and cut and slip drill line.
REMARKS:..
(,
SERVICES PROVIDED: DML MUDLOGGING and RIGW ATCH MONITORING SYSTEM
Epoch Persormel on site: 4 Arco Alaska Reps: Don McKelvey/Dave Bumgarner Report By: Craig Silva
(' (
EPOCH WELL LOGGING, INC.
MORNING REPORT
( ARCO ALASKA, INC. ALPINE #lA
Date: 2-28-95 Time: 04:00 Last Casing: 13 3/8" at 1765'
04:00 Depth: 9405' YESTERDAY: 8185' 24 Hour Progress: 1220'
Estimated Pore Pressure: 9.2ppg DC Exponent: 0.78
ROP Sand: 84 ftlhr ROP Shale: 78 ftlhr
BIT INFORMATION:
No. Size Type SIN Jets Interval Ftg. Hours Condition
5 8.5" HYCALOG DS40HF 16095 2-11 's,2-12's 8185' - In Hole
DRILLING PARAMETERS: HIGH LOW AVERAGE
Rate of Penetration 150.0 at 8300' 17.6 at 9100' 80.0 ftlh r
Torque 454 at 8823' 261 at 8433' 399 amp
Weight on Bit 6 at 8462' 1 at 8747' 3 Klbs
Rotary RPM 336 at 8620' 272 at 9026' 312 rpm
Pump Pressure 2807 at 8195' 2044 at 9049' 2486 psi
DRILLING MUD REPORT: Report Depth: 9405'
MW 10.1 VIS 39 PV 11 YP 15 GELS 4/12 FL 5.6 FC 2
SOL 11.0 OIL 0 SD Tr MBT 32.0 pH 8.9 CI- 400 Ca+ 40
GAS SUMMARY: HIGH LOW AVERAGE
Total Ditch Gas (units) 30.0 at 8350' 6.0 at 8962' 15.5 units
( Total Cuttings Gas (units) 36 at 9180' 7 at 8970' 19.4 units
Methane (C-1) (ppm) 4867 at 9162' 973' at 8962' 2528 ppm
Ethane (C-2) 296 at 8330' 51 at 8973' 136 ppm
Propane (C-3) 239 at 8330' 23 at 8923' 84 ppm
Butane (C-4's) 74 at 8700' 7 at 9023' 34 ppm
Pentane(C-5's) 12 at 8705' 0 at 9023' 4 ppm
Background Gas: 7 units Trip Gas: 46 units at 8185"
Connection Gas: units at Wiper Gas: units at
OIL SHOWS: Numerous trace shows from sandstones throughout the entire report interval; occ the show
is improved to poor; in general the sandstone usually has some clay or silt in the supporting matrix and the
visible porosities are mostly poor; predominantly trace to 5% dull yellow sample fluorescence; slow dull
greenish yellow cut fluorescence with spotty very slow streaming; dull yellowish gold residual ring; only rare
light brown oil staining, visible porosties are poor to fair; the sanstone with fair visible porosity are generally
friable.
LITHOLOGY:
Mudstone/claystone/siltstone 28%
Tuff/Calcareous tuff 2%
Shale 36%
Sandstone 34%
DAILY ACTIVITY SUMMARY: Cut and slip drill line; RIH; drill from 8185' to report depth.
RE:MA.RKS: ..
(
SERVICES PROVIDED: DML MUDLOGGING and RIGW ATCH MONITORING SYSTEM
Epoch Persormel on site: 4 Arco Alaska Reps: Don McKelvey/Dave Bmngarner Report By: Craig Silva
EtOCH WELL LOGGING, ~c.
MORNING REPORT
( ARCO ALASKA, INC. ALPINE #lA
Date: 2-27 -95 Time: 04:00 Last Casing: 13 3/8" at 1765'
04:00 Depth: 9940' YESTERDAY: 9405' 24 Hour Progress: 535'
Estimated Pore Pressure: 9.2ppg DC Exponent: 0.83
ROP Sand: 99 ftIhr ROP Shale: 75 ftIhr
BIT INFORMA.TION:
No. Size Type SIN Jets Interval Ftg. Hours Condition
5 8.5" HYCALOG DS40HF 16095 2-11 's,2-12's 8185' -9940' 1755' 24.0 In Hole
DRILLING PARAMETERS: HIGH lOW AVERAGE
Rate of Penetration 133.0 at 9443' 16.4 at 9551' 89.6 ftIh r
Torque 491 at 9708' 372 at 9173' 430 amp
Weight on Bit 7 at 9614' 2 at 9610' 4 Klbs
Rotary RPM 321 at 9679' 294 at 9473' 306 rpm
Pump Pressure 2751 at 9933' 2220 at 9558' 2489 psi
DRILLING MUD REPORT: Report Oepth: 9940'
MW 10.1 VIS 40 PV 12 YP 14 GELS 4/8 Fl 4.6 FC 2
SOL 12.0 Oil 0 SO Tr MBT 29.0 pH 9.1 CI- 400 Ca+ 40
GAS SlJMMA.RY: HIGH lOW AVERAGE
Total Ditch Gas (units) 495.0 at 9713' 13.0 at 9559' 78.5 units
( Total Cuttings Gas (units) 215 at 9670' 11 at 9620' 47.8 units
Methane (C-1) (ppm) 53897 at 9713' 2060 at 9559' 9775 ppm
Ethane (C-2) 7068 at 9713' 153 at 9559' 1018 ppm
Propane (C-3) 6892 at 9713' 94 at 9559' 882 ppm
Butane (C-4's) 3242 at 9713' 15 at 9559' 409 ppm
Pentane(C-5Is) 1160 at 9713' 2 at 9171' 136 ppm
Background Gas: 24 units Trip Gas: 46 units at 8185"
Connection Gas: units at Wiper Gas: 50 units at 9940'
OIL SHOWS: Very good to good show from 9640' to 9750', and a poor show from 9750 to TO; well sorted
very fine sandstone has good visible porosity and pervasive light brown oil staining; very friable, and mostly
disaggregated in cuttings samples; abundant bright yellowish white splashy to pinpoint pops in the mud;
slight sheen while washing samples; 90-100% bright yellow sample fluorescence; instant very bright bluish
white to greenish yellowish white cut fluorescence with fast blooming and streaming; coloress to very faint
straw cut in plain light; very bright yellowish white to white residual ring fluorescence that is colorless to to very
faint brown in plain light; slight petroleum odor; note that the sandstone has 2% glauconite grains.
LITHOLOGY:
Siltstone 3%
Tuff/Calcareous tuff 2%
Shale 43%
Sandstone 52%
DAILY ACTIVITY SlJMMA.RY: Orill from 9405' to 9940' (T.O.); circulate bottoms up; pull 12jts out of
the hole; ream the 12 jts back in a contolled fashion for a M.A.O. run with theLWO tool; circulate bottoms up;
POOH.
(
REML\R.KS: ..Clay packed on the stabilizers made it very tight pulling the collars through the casing shoe.
SERVICES PROVIDED: DML MUDLOGGING and RIGW ATCH MONITORING SYSTEM
Epoch Persormel on site: 4 Arco Alaska Reps: Don McKelveylDave Bumgarner Report By: Craig Silva
(' (-
EP'OCH WELL LOGGING, IN'C.
MORNING REPORT
(
ARCO ALASKA, INC.
Date: 2-28-95
04:00 Depth: 9940'
Time:
YESTERDAY:
04:00
9940'
ALPINE #lA
Last Casing: 13 3/8" at 17651
24 Hour Progress: 0'
Estimated Pore Pressure: NI A DC Exponent: NI A
ROP Sand: x ftIhr ROP Shale: x ftIhr
BIT INFORMATION:
No. Size Type SIN
5 8.5" HYCALOG DS40HF 16095
DRILLING PARAMETERS:
Rate of Penetration
Torque
Weight on Bit
Rotary RPM
Pump Pressure
DRILLING MUD REPORT:
MW 10.1 VIS 40 PV
SOL 12.0 OIL 0 SO
(
GAS SUlVIMARY:
Total Ditch Gas (units)
Total Cuttings Gas (units)
Methane (C-1) (ppm)
Ethane (C-2)
Propane (C-3)
Butane (C-4's)
Pentane(C-5's)
Background Gas:
Connection Gas:
OIL SHOWS: NIA
LITHOLOGY:
HIGH
31.0 at
at
at
at
at
at
at
14
units
units at
Jets
2-11 's,2-12's
HIGH
at
at
at
at
at
Report Depth: 9940·
12 YP 14
Tr MBT 29.0
9940'
Interval Ftg. Hours Condition
8185' -9940' 1755' 24.0 2-2-ER-A-X-1/16- TD
LOW AVERAGE
at ftIh r
at amp
at Klbs
at rpm
at psi
GELS 4/8 FL 4.6 FC 2
pH 9.1 CI- 400 Ca+ 40
LOW AVERAGE
5.0 at 9940' 20.0 units
at units
at ppm
at ppm
at ppm
at ppm
at ppm
Trip Gas: 39 units at 9940"
Wiper Gas: units at
DAILY ACTIVITY SUlVIMARY: POOH; stand back drill collars and heavy weight drill pipe; make up
mule shoe; pick up 34 jts of drill pipe and RIH; circulate bottoms up; circulate and condition mud while
setting up cementers; lay P+A plug at 9940' to 9140'; pull up and circulate and condition mud free of cement;
lay down drill pipe while pulling up to second cementing point; lay plug at 4700' to 4110'; pull up and circulate
and condition mud free of cement; POOH; pick up drill bit and lay down drill pipe while RIH; stop at show and
wait on cement; replace brake pads on draw works.
REMARKS:..
(
SERVICES PROVIDED: DML MUDLOGGING and RIGW ATCH MONITORING SYSTEM
Epoch PersoJUlel on site: 4 Arco Alaska Reps: Don McKelveylDave Bmngamer Report By: Craig Silva
EPOCH WELL LOGGING INC.
2-17-95 to 2-27-95
2 3 4 5 6 7 8 9 10 11 12 13
DAYS
1
-12
o
"".
~-
:-:-tI. _ _ _ _ . - _ _ - ;- - - - -
- 1 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -T~~ ~L- DEPTH: 9,940'
",-
~
I' _ ____________
-8 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~- - - - - - -S-ET ·pi.,ÛGS AND PREPARE
TO DRILL ALPINE NO. 1 B
(
_ 6 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ "-_ _ D~I L~IN~ 8 _1 ~2· ~OLE _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
-4 - - - - - - - - - - - ----- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
KICK OFF PLUG AT 18761.
- 2 ,,- -~ - - - - - - - - - - - - - - - - - - - -
--------
------------- ----------
--------
- - - - - -
SET CEMENT KICK OFF PLUG.
TOP PLUG AT 16051
---....,
DEPTH (THOUSANDS)
o
ARC a AT!ASKA INC. ALPINE NO. ~A
DRILLING TIME SCHEDULE
DEPTH VS TIME
..-....
'---'"
¡"------
ARCO ALASKA INC.
ALPINE NO, lA
FOOTAGE PER DAY
FOOTAGE
1,800
1,600
1,400
1,200
1,000
80O
6OO
40O
2OO
0
0
2=17-95 to 2-27~95
2 4 6 8 10
DAYS
EPOCH WELL LOGGING IHC,
-..---
~~.,:
ARca Alaska, Il
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
TRANSMITTAL
~~
~~
TO: State of Alaska
AOGCC
3001 Porcupine Drive
Anchorage, Alaska 99501
AUn: Robert P. Crandall
DATE: March 23, 1995
AIRBILL: Airland # 646244
AFT#: ABV05-03-23-01
CHARGE CODE# AX9329
OPERATOR: ARCa Alaska INC.
SAMPLE TYPE: Ditch cuttings
NAME: Various Alpine wells
NUMBER OF BOXES: 11 boxes
SAMPLES SENT:
S~jj-tt- q~q
q ~-D(~
Alpine #1 A
1800-9940'
Alpine #18
1800-8850'
Alpine #1
120-7500'
SENT BY: Dan Przywojski
UPON RECEIPT OF THESE SAMPLES, PLEASE NOTE ANY DISCREPANCIES AND MAIL
A SIGNED COPY OF THIS FORM TO:
RECEIVED
BY:
#LIdtf
Arco Alaska, Inc.
619 E. Ship Creek Ave
Anchorage, AK. 99510
Attn: Suite 104
DATE:
,Z I~ f)~
AR3B-6003-93
242-2603
--
--
/
-~.~
~
~I
}~
.------
ARca Alaska, Inc.
AtlanticRichfieldCompany
TO:
Alaska Oil & Gas Consveration Commission
Attn.: Robert P. Crandall
3001 Porcupine Dr.
Anchorage Alaska 99501
DATE: 21 , April 1995
-.
~~
~~
FROM: Ms. Kelli A. Thibodeau ATO-1466
ARCO Alaska, Inc.
700 G. Street
Anchorage, Alaska 99510
(907) 265-6240
Transmitted herewith is the followinQ data concerning Alpine 1 :
API # 501032021100
REPORTS:
Alpine 1 A
1 Copy Morning Drilling Reports rs--/g.¡
Alpine 18
1 Copy Morning Drilling Reports q 5 -dO
RECEIVED
If you have any questions please call me at (907) 265-6240.
Kelli
APR 2 4 1995
Alaska Oil & Gas Cons Co miss
. In Ion
Anchora(})
RETURN SIGNED COpy TO:
ARGO Alaska, Inc.
Attn.: Ms. Kelli A. Thibodeau-ATO-1466
700 G. Street
Anchorage, Alaska 99510-0360
(907) 265-6240
Received by:
DATE:
~
~
1 OF 1
Approved for transmittal by:
~ ( II~ 6Q FÆ/fH
F. M. Honeycutt
Manager, North Alaska Exploration
,
I~"~
,.-..
sper'r'}j-5un
CRIL-LING SERVICES
MWD End of Well Report
for
ARca ALASKA INC.
Rig : POOL RIG 6
Wen: ALPINE #1A (WILDCAT)
Field : WESTERN COLVILLE EXPLORATION
Country: USA API# 50-103-20211-01
Job No.: AK-MM-95104
Date : 28-FEB-95
¡L~j .~
I~/(I;()
Oete~~/l/fl/)
RECEJVED
APR 2. 0 1995
Ä\aska Oll &. Gas cons. Commission
Anchorage
MWD End of Well Report
[
[
[
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1.
2.
3.
4.
5.
6.
AK-MM·95104
('
Contents
General Information
Operational Overview
Summary of MWD Runs
Bitrun Summaries
Survey Data
Service Interrupt Reports
t
spel'""r"Y-5un
c:;I~'L.L.II"O ..~Vlc:...
MWD End of Well Report
MWD End of Well Report
sper"'rn!:t'-sun
þ",,~1 ''''0 ..~VIC:..
General Information
l
AK·MM·95104
Section 1.
[
[
[
[
[
[
[
[
[
l
[
[
[
[
[
l
l
[
(
I
[
I
I
I
I
[
I
[
[
I
I
I
I
I
I
I
I
AK·MM-95104
(
(
General Information
Company
Rig
Well
Field
Country
Sperry-Sun job number
Job start date
Job end date
North reference
Declination
Dip angle
Total magnetic field
Date of magnetic data
Wellhead coordinates N
Wellhead coordinates E
Vert. section direction
MWD Engineers
Company Representatives
Company Geologists
Engineering units used :
Depth / length
OD / ID
Temperature
Flow Rate
Pressure
Weight on bit
Mud Weight
feet
inches
deg. F
galls/min
psi
Ibs (1000s)
ppg
sperf'"""y-sun
P"'I~"'IIVØ .....Vlc::..
ARCO ALASKA INC.
POOL RIG 6
ALPINE #1A (WILDCAT)
WESTERN COLVILLE EXPLORATION
USA API# 50-103-20211-01
AK-MM-95104
17-FEB-95
28-FEB-95
TRUE
27.9
80.4
57183.00
23-JAN-95
1465 FSL 2250 FWL
Sl TIIN R4E
327.2
DOUG ELLIS
FERGUS TAIT
DAVE BUMGARNER
DON McKELVEY
PAUL DECKER
Viscosity
PV
YP
Chlorides
Fluid loss
Casing weight
BOB SPERANDIO
sec/ quart
mPa.s
Ib/(100 sq.ft.)
ppm
m1 (cc.)
Ibs/ft
MWD End of Well Report
MWD End of Well Report
spe~J"""y-sun
þfllllL-I..IIVO .....\IIC..
Operational Overview
,~
"\.
AK-MM-95104
I
I
[
I
I
I
I.
I
Section 2.
("
I
I
I
I
I
I
I
I
("
('
sper.....y-sun
þ...I\..\..II\IO .....vle..
Operational Overview
(
(
RAN WIRELINE LOGS FROM ll-FEB-95 TO 16-FEB-95. TESTED B.O.P.
PICKED UP 12 1/4" BIT AND DRESSED TOP OF CEMENT TO 1800 MD.
PICKED UP 8 1/2" BIT, DRILLING MOTOR AND MWD TOOLS.
STARTED SIDETRACKING AT 1805 MD.
MWD RUN #4 WAS USED TO SIDETRACK ALPINE 1 PROVIDING REALTIME STEERING, SURVEY,
GAMMA RAY AND RESISTIVITY DATA FROM 1805 TO 4874.
ALL REALTIME AND RECORDED DATA WAS SUCCESSFULLY RECIEVED AT THE SURFACE.
(
[
MWD RUN #5 WAS INITIALIZED WHEN THE BIT WAS TRIPPED AND CHANGED AT 4874. THE
TOOL UTILIZED WAS THE SAME AS IN RUN #4 PROVIDING REALTIME STEERING, SURVEY,
GAMMA RAY AND RESISTIVITY DATA FROM 4874 TO 6217.
ALL REALTIME AND RECORDED DATA WAS SUCCESSFULLY RECEIVED AT THE SURFACE.
(
MWD RUN #6 WAS INITIALIZED WHEN THE BIT AND BHA WERE TRIPPED AND CHANGED AT
6217. PROVIDED REALTIME STEERING, SURVEY, GAMMA RAY, AND RESISTIVITY DATA
FROM 6217 TO 7568. ALL REALTIME AND RECORDED DATA RECOVERED.
(
MWD RUN #7 DRILLED FROM 7568 TO 8186 AND PROVIDED REALTIME STEERING, SURVEY,
GAMMA RAY, RESISTIVITY, NEUTRON, AND DENSITY DATA. ALL REALTIME AND RECORDED
DATA RECOVERED. POOH TO CHANGE BIT AN BHA.
(
MWD RUN #8 DRILLED FROM 8186 TO TD AT 9940 MD. PROVIDED REALTIME STEERING,
SURVEY, GAMMA RAY, RESISTIVITY, NEUTRON, AND DENSITY DATA. ALL REALTIME AND
RECORDED DATA RECOVERED. TRIP OUT OF HOLE AND PREPARE FOR NEXT SIDETRACK.
(
(
(
(
(
(
AK·MM·95104
MWD End of Well Report
MWD End of Well Report
spe""'-'y-5un
O~I ~'NO .....Vlc:.~
Summary of MWD Runs
('
AK·MM-95104
[
[
[
(
[
[
[
[
Section 3.
[
[
I
I
I
I
I
[
[
('
-
-
-
MWD Bit Hole MWD
Run No. Size Sensors
04 6 8.50 OIR - FE
05 2 8.50 o IR· FE
06 3 8.50 OIR - FE
07 ·8;50 01 R-, FE: ...
08 5 8.50 OIR - FE
-
-
-
~
-
-
--.¡
~
Summary of MWD runs
Start End Drill/Wipe Run Start Run End BRT
Depth Depth Distance Time Date Time Date Hours
1805.0 4874.0 3069.0 15:05 17-FEB-95 20:00 19-FEB-95 52.92
4814.0. 6217.; O. . . 1343.0 20:25 )9·.FEB~·~5: .04.: 25· . 2i ~tEB - 95 32~00.
6217.0 7568.0 1351.0 06:35 21-FEB-95 06:55 23-FEB-95 48.33
.... .. ... ... .. . . . . .... .
7S6R. 0 . :a¡86.0 . 61a;Q··> .:.:.: l:i:25::23 ~ J:$.~:$..:..: :. 23~05 :·24-f.~B-95 ..>. 33:(67.
8172.0 9940.0 1768.0 23:27 24-FEB-95 04:05 27-FEB-95 52.63
..
.. .
AK-MM-95104
TOTALS ->
8149.0
219.55
-
- -..¡
Oper.
Hours
Cire.
Hours
53.08
32.12
48.65
33.92
52.80
7.80
9.19
7.48
9.63
220.57
43.73
-
Max.
Temp.
130.0
107.0
118.0
121.0
133.0
-
sper'r'Y-sun
CRIL-L-ING .."vlces
Service Trip for Failure
Interrupt MWD Type
,--...,
.~
o
o
MWD End of Well Report
Bitrun Summaries
spe""""y-sun
c"'IL..'--'NØ .....Vlc:..
(
AK-MM-95104
[
I
I
[
I
I
I
Section 4.
I
I
I
I'
I
I
I
I
I
I
(
MWD End of Well Report
AK-MM·95104
PICKED UP TOOL TO KICK OFF AT 1805 MD AND DRILLED TO 4874 MD Max. Temp. : 130.0 deg F
WHEN THE ASSEMBLY WAS PULLED FOR A BIT CHANGE. Survey/ TF%: 100 / 100
ALL OF THE REALTIME AND RECORDED DATA WAS RERCIEVED. DGR RT/Rec%: 100 / 100
EWR RT/Ree%.: 100 / 100
CNP RT/Rec%: 0 / 0
SFD RT /Rec9ô: 0 / 0
SLD RT/Rec%: 0 " 0
2.812
2.812
2.812
2.812
3.063
2.250
3.063
2.812
2.875
2.625
I. D.I
'."
'? .~
, .;;~:
;~:~:.~' 'f
'~~~~~.""........".'.."'. -.... -..-
MWD Performance
Comments
_.
:
::....;. .
:: ..;... ~
.' .~ . .
r-.
I.,~I
.'
: ~':
· ~ .: @ ;=:
· ·:f· 14. 16 X HWDP 479.50 5.000
13. D.O.T. JARS 33.20 6.250
.. .. ~.
II.?I 12. 4 X HWDP 120.25 5.000
"-,
(j) 11. CROSS-OVER SUB 3.65 6.375
'-' -
. . líõ', ~; 10. 6 x DRILL COLLAR 183.00 6.438
'--" 'to'.-:~
- 9. FLOAT/CROSS-OVER SUB 2.87 6.875
,.......
19\
~ . '-" - 8 . PULSER / PM 20.56 6.750
(8') ,-
"oJ I 7 . RLL STRING 21.60 6.750
(~IIII~'II 6. x/o SUB 0.95 6.125
......., -
1 ~ - 5. x/o SUB 1.12 6.188
,'í?"
.~ -
I 4 I x/o SUB
'71 ~ 4. 0.86 6.250
3 . NON MAG STABILIZER 4.96 6.750
1"7",1 6 3/4" MACH 1C 1.2 AKO
2 . 21.45 6.750
"'I~ 1. 8 1/2" HTC ATJ-P05 0.85 8.500
-~
-
[II::: t.: t.lr:. ?.:. ';'(1
[":;OF, .:: IJt
[11.J:t! <::~mm,:& F:'i'
- F-æI
- EWF. t i:" t'i t . .¡ (I t.:
-
F:I::: J. E t J..' 1': .,'
-
EL'IIF. F'hOiE-= .J EIJt.
- ¡;ææ¡
CIM sub
DQwnhole pro~-=~3~r
F'LL S II : F·(\:''<'3(GF:~
~-
PM to blt : ~7.07
pr·' S'ub
Dlr~çtl~nal ~e~~or
~@ So 'N PI)31:PW;-"~.
Choke 1 ¿
O.D.
Length
pr., F"J 1 :: E- r
Component
· .
BHA Schematic
MWD Schematic
- ....................... ... .
. . ..- . ,... .
- -. . ....
1805.0
4874.0
3069.0
450.00
50
18 Klbs
107 ft/hr
2200 psi
04
6
8.50 in
15:05 17-FEB-95
20:00 19-FEB-95
52.92
7.80
53.08
MWD Run
Rig Bit
Hole Size:
Run Start:
Run End
BRT hrs
Cire.hrs
Oper.hrs
Start Depth:
End Depth
Footage
Flow Rate
R.P.N.
W.O.B.
R.O.P.
S.P.P
Mud Data
Mud type : BLAND
Weight/Vise: 10.30 / 43.0
Chlorides : 1400
PV / YP : 14 / 18
Solids/Sand: 13.0 / 0.01
%Oil/ O:W : 0 / 0 :87
ft
ft
ft
gpm
Drilling Data
MWD Run Time Data
"....., .....
.. .... ..._-......_-.. ..._-.............
(
Bitrun Summary
spel'""'l'""\J-5un
c:J"II-L..II\IO .."'VIC..
(
....
c'
..
0:0>
~I·,g
.~ "..
:0
'. :-.: ;.
~,.
. .
, ,.
0,.:*
' '~.
, .~..,.~
; *~
~~~~
, :ff~~
......
o
".
·.f¡~
·r"~.
~
.: .'
[ .:-,
, .
I. : .'
. .'0'",
: :_~~..:. .
r
MWD End of Well Report
Max. Temp. : 107.0 deg F
Survey/ TF%: 100 / 100
DGR RT/Ree%: 100 / 100
EWR RT/Ree%: 100 / 100
CNP RT/Ree%: 0 / 0
SFD RT/Ree%: 0 / 0
SLD RT/Ree%: 0 / 0
AK-MM·95104
...
I
DRILLED FROM 4874 TO 6217. PULLED OUT OF THE HOLE TO CHANGE
BITS. ALL OF THE REALTIME AND RECORDED DATA WAS RECOVERED.
12. 16 x HWDP 479.44 5.000 3.063
11. JARS 33.20 6.250 2.250
10. 4 x HWDP 120.25 5.000 3.063
9. CROSSOVER 3.65 6.375 2.813
8. 6 x DRILL COLLARS 183.00 6.438 2.438
7 . FLOAT SUB 2.87 6.625 2.875
6. PM/PULSER 20.56 6.750 1.920
5. RLL STRING 21.60 6.750 1.920
4. CROSSOVER 1.85 6.750 2.813
3. NON-MAG STABILISER 4.96 6.750 2.813
2 . 6 3/4" MACH 1C 1.2 AKO 21.45 6.750
1. 8 1/2" DS 40HF 0.80 8.500
MWD Performance
""
I. D.I
O.D.
Length
Component
BHA Schematic
... . -.. . .
.. ... ..-
Mud Data
Mud type : BLAND
Weight/Vise: 10.00 / 42.0
Chlorides : 500
PV / YP : 13 / 14
Solids/Sand: 11.0 / 0.01
%Oil/ O:W : 0 / 0 : 89
4874.0 ft
6217.0 ft
1343.0 ft
450.00 gpm
50
3 Klbs
86 ft/hr
2150 psi
Start Depth:
End Depth
Footage
Flow Rate
R.P.M.
W.O.B.
R.O.P.
S.P.P
Drilling Data
spe.-..-.y-sun
b""~~"'O .."'VIC..
Bitrun Summary
(
Comments
=1
- """'\
I,.:) ~
;--,
I.~.' I
I:~:'II'~III
¡'~"I M~.
~<
1':'11 ~
-' -
-
,
-
.-, It.-:/':'
I..:' ~~
....
@ ~
~' ;~
1!01
'-',
,....... .
191
'-'
I': I
[":;-, ,:.:. b:.,: ]':' "
~:;F sub
Du~l 0~~m~ F~y
rWR ':c tl': : )~.~~
,""",
I" I
'-/
EWR FhasE ~ sub
~eE~Etl·.·!t~'
CHI sub
['I·::-wnh,=·l" rr':'':'E"=:0r
RLL S/IJ : P0323CGRt:.
. "
pr·1 to bH : so.¡. ~';'
pr·1 sub
Dlr~ç'::.~nal s@nS0r
..... .
:"" ~
s:¡¡ : P0Jl~PM6-'9
Chok~ : 12
P~I. Ful-S''O!
..
·r·
. .':~
. . ~
-~
-
-
C'
-
-
. =--: ~
~~"'~~'~
: :;~
[IJ~
::-.;..
¡". ~
>{~,]
!f0?: ~
~ ,I..:
: ;.
: .....::
t·, /'
r ""
i ..
¡.
-~
. r\
-~
-
:€'
: i . ~f.
, : ~'~2~
'j~~-:
..;.:.-;..
- . :--....0:....
",.~'~"
f@~i: :f:
" .~i.;
! "1"·'
o
, "
--
1'- (~r~:'''''' MWD Run Time Data
: .(... ~
¡ '·Ú;.'; MWD Run : 05
',~~; Rig Bit : 2
.'~
;;e Hole Size: 8.50 in
:,@~
~?J.é Run Start: 20:25 19-FEB-95
. ~:á Run End : 04: 25 21-FEB-95
J','.
~* BRT hrs : 32.00
¡f...
¡,·>~:W~ Circ.hrs : 9.19
:',:>4;.. h 32 12
:¡ "\ Oper. rs: .
.. ...: .~
'j>..--.. -.------ ---
¡. ';-à MWD Schematic
: >rI'.;.
('
MWD End of Well Report
Max. Temp. : 118.0 deg F
Survey/ TF%: 100 / 100
DGR RT/Ree%: 100 / 100
EWR RT!Ree%: 100 / 100
CNP RT/Ree%: 0 / 0
SFD RT/Ree%: 0 / 0
SLD RT/Ree%: 0 / 0
AK·MM·95104
........ .....
,.
"':"',',
I
DRILLED FROM 6217 TO 7568. PULLED OUT OF THE HOLE TO CHANGE
BHA. ONE HUNDRED PERCENT OF THE REALTIME AND RECORDED DATA
WAS RECOVERED. THE RLL TOOL WAS LAID DOWN AND THE DENSITY,
NEUTRON, GAMMA RAY AND EWR LOGGING TOOL WAS PICKED UP.
MWD Performance
13. 16 x HWDP 479.44 5.000 3.063
12. JARS 33.20 6.250 2.250
11. 4 x HWDP 120.25 5.000 3.063
10. CROSSOVER 3.65 6.375 2.813
9. 6 x DRILL COLLARS 183.00 6.438 2.438
8. FLOAT SUB 2.87 6.625 2.875
7 . PM/PULSER 20.56 6.750 1.920
6. RLL STRING 21.60 6.750 1.920
5. CROSSOVER 1.85 6.750 2.813
4. NON-MAG STABILISER 4.96 6.750 2.813
3 . NON-MAG LEAD COLLAR 9.87 6.188 2.750
2. 6 3/4" MACH lC 1.0 AKO 21.04 6.750
1. 8 1/2" ATJ-P05 0.85 8.500
I. D.\
Length
Component
O.D.
BHA Schematic
.. . -...
- - - .-- - - - - -- ..... ...
Mud type : BLAND
Weight/Vise: 10.10 / 40.0
Chlorides : 500
PV / YP : 11 / 14
Solids/Sand: 11.0 / 0.01
%Oil/ O:W : 0 / 0 : 89
6217.0
7568.0
1351.0
460.00
60
28 Klbs
45 ft/hr
2650 psi
Start Depth:
End Depth
Footage
Flow Rate
R.P.M.
W.O.B.
R.O.P.
S.P.P
ft
ft
ft
gpm
Mud Data
Drilling Data
""""
... I .... .....
, . .. I. .. ,.....
II ....."".
...... ................,
..-..,.. ,
spe""""y-sun
Þ~'i..L.I"'O ..ltVIC..
Bitrun Summary
(
Comments
(~'I
'..J 6J
<~> -
I ~I I
I': I ]
~
111 [@
(13' ~
'--,
(,)1 =
'-'
1"-'1
'-'
,"iõ',
Ito._'"
-
.'....... ø....~
'2,.' ," ~,:
If~
1f,'1 ~
"-'
(7:' I
'-' I
(~) III~'II
,~
I .'
" ,
-
I.
[,,:::~, t: t 1 r. ...¡ ':' j ~
7. ~:":~l Õ:~~rTorT'~ F,aï
k
-~
--
-
EWR to bIt ' ~8,0S
rw~ Ph~æ~ 4 æ~b
~esl¿tlvlt~
:!Ò
1"'.
'?
""
- sæ;;,
'.,'
en-I õl.Jb
r''':,wr.h·:·l-:: \:'l" ':·:eæ ::':'l"
a'
.:.. :
þ~~
~.~~
~I~
I ~..)
: :'..~
¡ (!~
I;'
:; P.. :..~~
i .' :,:',:
;
: I
, ...,
. P L L S' I , PC·? :: :U: I';R 0:
,; ,
- iæ.a
PI' t c· b 1 t : .;. oj , SO
PI' .::ub
Dlr~~tl~n~l ~~n~~r
, ,
....... .
. ... :- .
::,~,::-/: ~
. .:....
i.·.;~.·...:;
:r ,:;~.
¡€.' s'n F')312FI'6-7~
. Choke 12
PI, Pu 1 ~ 0: r
MWD Schematic
, ,
06
3
8.50 in
06:35
06:55
48.33
7.48
48.65
21-FEB-95
23-FEB-95
·1-'-"~'o)'(Z ';', ,',
.>$t:.,,,...
~-:-.<:
.~
~,i:~
/.$,
',' ,7:ø:;'
:......~~.
:?~.:::w:
:4·~~^..:-::
I ': "
" '~.
......
:;w::
"~~~ .. ., ,.
;', ': .
~'~}..~.'.
:~" ..
MWD Run
Rig Bit
Hole Size:
Run Start:
Run End
BRT hrs
Cire.hrs
Oper.hrs
MWD Run Time Data
('
MWD End of Well Report
AK·MM-95104
RE-LOGGED FROM 4600 TO 4700 APPROX. 100 HOURS AFTER DRILLING Max. Temp. : 121.0 deg F
DRILLED FROM 7568 TO 8186. PULLED OUT OF THE HOLE TO CHANGE Surv'ey/ TF%: 100 / 100
THE BIT AND BHA. ONE HUNDRED PERCENT REALTIME AND RECORDED DGR RT/Ree%: 100 l 100
DATA WAS OBTAINED. EWR RT/Rec%: 100 / 100
CNP RT/Rec%: 100 / 100
SFD RT/Ree%: 100 / 100
SLD RT/Rec%: 0 / 0
,.-',
11 II
'-" M 13. 16 x HWDP 479.44 5.000 3.063
.-.., J 12. JARS 33.20 6.250 2.250
I~~I
,...... ~ 11. 13 x HWDP 389.41 5.000 3.063
I '=t I
"'...:....
- 10. CROSSOVER 3.65 6.375 2.813
.,,-
1'3 , 9. 3 x DRILL COLLARS 91.41 6.438 2.438
"-" ï
I 7 1 8. FLOAT SUB 2.87 6.625 2.875
.../
I~IIII~III 7 . PM/PULSER 20.56 6.750 1.920
,'-, ...
. . I~} - 6. RLL STRING 36.04 6.750 1.920
,"';", Ô
,-" -= 5. CROSSOVER 1.85 6.750 2.813
"-, :
I::' I 4 . NON-MAG STABILISER 4.96 6.750 2.813
1:'1 l 3. NON-MAG LEAD COLLAR 9.87 6.188 2.750
1'7:, i 2. 6 3/411 MACH 1C 1.0 AKO 21.04 6.750
1. 8 1/211 R-417G 1.40 8.500
Comments MWD Performance
,....., ~
I!.:~I
,....... =,
I, 1;'1
I. D.I
Length
Component
O.D.
BHA Schematic
- ... . .. ..... .-
......................... -
Mud type : BLAND
Weight/Vise: 10.10 / 39.0
Chlorides : 500
PV / YP : 14 / 14
Solids/Sand: 12.0 / 0.10
%Oi1/ O:W : 0 / 0 :88
7568.0 ft
8186.0 ft
618.0 ft
460.00 gpm
70
5 K1bs
45 ft/hr
1950 psi
Start Depth:
End Depth
Footage
Flow Rate
R.P.M.
W.O.B.
R.O.P.
S.P.P
Mud Data
Drilling Data
. . . . . .. .
spe""''''''y-sun
tI"'IL..L..I/\JCJ .."'VIC..
(
Bitrun Summary
~~
I:o.::F: ~': t'H . ~ 1.: ~
C'GF, ~ IJ t·
[llj s& 1 I:: S& rTlli'l;' F ~:"
~ 8 (I "'I
II
-~
..; Fr' ~ ':. t· 1 t
SF[· ~ IJb
C,o",n¿ltJ'
.
:t
'1
-T
CN F' ~ ',: t· it' : S ~~,
n RLt .5 fI : pr::. j 3 ~ ': FJ IC"::'::·
;;¡
C' Jr.1 s IJ t.
e,owl"'.hc. 1 e F' r ':..: -= = :: ,::>1'
.. - iææa
- EWF: FhasE ~ = IJ t,
- - J;,ø:aS'J.S"t j,"'l':¡'
':='
- [vlF t'::o t'1 ~ ~ :~ . (II)
- :
-T au: SIJb
" r",u~ r":·f¡ F':'l"':'= l ~ ','
.
- '1ëæ=I
PM t.:· t·:. t ' ..;.,..¡.,
..
PI'" 5'ub
DlreCtional =~n=or
. ,
..
'='
... r""
.f.
'"
5 : n F' (I 3 1 ::. pr'1 ~ . "7?
Choke 12
:€)
--
. PM Pul~':?r
MWD Schematic
~".".".'.':
..,'....,'.
.. .. . -- --
.....'.....
07
4
8.50 in
13:25 23-FEB-95
23:05 24-FEB-95
33.67
9.63
33.92
MWD Run
Rig Bit
Hole Size:
Run Start:
Run End
BRT hrs
Cire.hrs
Oper.hrs
. ...'
.... "ß
MWD Run Time Data
........1.. .......
::"",:.,
(
MWD End of Well Report
AK-MM-95104
Max. Temp. : 133.0 deg F
Survey/ TF%: 100 / 100
DGR RT/Ree%: 100 / 100
EWR RT/Ree%: 100 / 100
CNP RT/Ree%: 100 / 100
SFD RT/Ree%: 100 / 100
SLD RT/Ree%: 0 / 0
COMMENCED DRILLING AND DRILLED TO TD OF 9940 MD, 7343 TVD.
MWD Performance
Comments
:"0 RLL SiN : fC-:~3~C'R!mGt
it: cm sub . . ~
¡, Downhol~ procE =- ::":>r ~ . .. r'í2',
h ~
:::
-~ ...
-- .
c' ::=: EWR PhaSle 4 S'Jb ,. e =i . :~. .
::= Res1suvny .
~ : . 12. 25 X HWDP 748 . 66 5 . 000 3 . 063
_ F= EW' '0 "n , ""44 ""'ð 11. D.O. T. DRILLING JARS 33.20 6.250 2.250
T '.' .,_, 10.4 X HWDP 120.25 5.000 3.063
. cr'l P ¿. u b . V~~) i.-
. ll'Õ'IJr:ron P':lfO:::.r::: ......... ="":; 9. CROSS-OVER SUB 3.65 6.375 2.813
I H) ",.~'
I cm: r:c· bn . .¡~. (': ...::.. ,",,,", 8. 3 X DRILL COLLARS 91.41 6.438 2.875
'...... ....
- ~II I.~I ~ 7. CROSS-OVER FLOAT SUB 2.87 6.625 2.875
,6'1
. !:H' .=ub ~ I 6. PULSER / PM 20.56 6.750
It . D-=-n=ltj' ....
II ::H' t·:· b:.r: . ?7.S1 ':~>III¡¡;"II 5. TRIPLE-COMBO RLL 36.02 6.750 1.920
r--, _
I <I I
- ¡;æ¡¡¡¡¡ ;=< ¡.... 4. CROSS-OVER SUB 1.85 6.750 3.063
~::;~/:~;m.; ';"," :~:. 3. NON-MAG STABILIZER 4.96 6.750 2.870
. "- "'-"1 2. 6 3/4" MACH 1 C 1. 0 AKO 21 . 04 6 . 813
[.,,::¡: r: ': t:. r: :' (, ~ ':' '_,
.- I I I.UJ 1 . 8 1/ 2" HYLG 16 0 9 5 0 . 8 0 8 . 5 0 0
~ Ij ';1 1
pr-, r:o bH .
. .
.:.......
sen::.or
pr-, sub
D1 ro:-cr: 1 c·n.:.l
...
..
I.D. ]
~rf
.(...
: PI) 3 1:' PI.,,; - "19
: 12
S'N
Choke
Length
Component
O.D.
PM " Pul.ô'er
. .
--
BHA Schematic
MWD Schematic
. . . ... .. .. . ... . . -
.. -.. -
.. .. ...
..- - . .. -
. .-. . -...". ... - ..-. . -.-
Start Depth: 8172.0 ft Mud type : BLAND
End Depth : 9940.0 ft Weight/Vise: 10.10 / 39.0
Footage : 1768.0 ft Chlorides : 400
Flow Rate : 444.00 gpm PV / YP : 11 / 15
R.P.M. : 70 Solids/Sand: 11.0 / 0.10
W.O.B. : 4 Klbs %Oi1/ O:W : 0 / 0 :88
R.O.P. : 74 ft/hr
S.P.P : 2370 psi
08
5
8.50 in
23:27
04:05
52.63
9.63
52.80
MWD Run
Rig Bit
Hole Size:
Run Start:
Run End
BRT hrs
Circ.hrs
Oper.hrs
24-FEB-95
27-FEB-95
Mud Data
Drilling Data
MWD Run Time Data
"..
...
.... ........
spel'"""i'y-sun
O,",IL.L-II\JO .."'VIC..
Bitrun Summary
(
(
. .
: ~'
..'.?:
ij~ ~
I"·)·
"4
. ·:ff
:~t;
-J~
:j~
;. ·,^ø::
. ~........:
., '.::S:'
: ..":'1
. ."
.~':f :$:
; ~.~~~
jl)
,....~:¥
. -=-: ~N.
.~,...:~
, .:~...;;~
""'N
~:?~~~
:; :.;~ ~i
, '1;.
":...;
k~
.\ ~
MWD End of Well Report
sper'r-y-sun
þflllL.L-INØ .....Vlc:..
Survey Data
(
AK·MM·95104
Section 5.
I
r
r
I
I
r
I
r
I
r
I
r
I
r
r
r
I
r
(
I { (
SPER.L\.i-SUN DRILLING SERVICES PAGE 1
ANCHORAGE ALASKA
I ARCO ALASKA, INC. DATE OF SURVEY: 022895
WILDCAT/ALPINE #lA MWD SURVEY
I 501035051101 JOB NUMBER: AK-MM-950104
NORTH SLOPE KELLY BUSHING ELEV. = 38.00 FT.
COMPUTATION DATE: 4/ 7/95 OPERATOR: ARCO ALASKA INC
I TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
I 1752 1752.32 1714.32 1 14 S 55.52 E .00 6.86S 12.95E -12.79
1805 1804.87 1766.87 1 10 S 52.21 E .19 7.51S 13.84E -13.82
1876 1876.30 1838.30 1 23 S 46.69 E .35 8.55S 15.05E -15.35
I 1971 1970.78 1932.78 4 25 N 31.39 W 6.12 6.22S 13.98E -12.81
2066 2065.93 2027.93 7 43 N 19.22 W 3.68 3.02N 9.94E -2.85
I 2157 2155.72 2117.72 10 45 N 19.01 W 3.32 16.82N 5.16E 11.33
2251 2247.23 2209.23 13 52 N 22.96 W 3.46 35.43N 2.07W 30.89
2345 2338.14 2300.14 17 6 N 25.40 W 3.48 58.39N 12.44W 55.80
2437 2425.47 2387.47 19 45 N 30.53 W 3.38 84.02N 26.15W 84.78
I 2531 2513.14 2475.14 21 33 N 31.43 W 1.95 112.36N 43.18W 117.82
2625 2600.24 2562.24 23 22 N 30.66 W 1.95 143.22N 61.74W 153.81
2720 2686.62 2648.62 24 51 N 35.05 W 2.46 175.65N 82.74W 192.44
( 2813 2770.61 2732.61 26 48 N 34.10 W 2.15 209.13N 105.80W 233.08
2907 2853.93 2815.93 28 57 N 36.32 W 2.52 245.12N 131.23W 277.11
3002 2935.01 2897.01 32 6 N 36.07 W 3.36 283.71N 159.47W 324.85
[ 3093 3011.41 2973.41 35 7 N 34.03 W 3.50 325.30N 188.60W 375.59
3188 3087.05 3049.05 38 22 N 33.98 W 3.44 37~.12N 220.18W 432.05
3281 3158.84 3120.84 40 45 N 33.51 W 2.58 421.43N 253.12W 491.35
3374 3227.75 3189.75 43 48 N 34.06 W 3.31 473.51N 287.97W 554.00
3469 3294.34 3256.34 46 35 N 32.89 W 3.08 529.46N 324.95W 621.06
I 3555 3352.07 3314.07 49 35 N 32.20 W 3.52 583.70N 359.55W 685.40
3639 3406.42 3368.42 49 50 N 33.83 W 1.51 637.47N 394.49W 749.52
3721 3458.95 3420.95 49 52 N 33.67 W .16 689.26N 429.10W 811.81
3801 3510.53 3472.53 49 47 N 33.81 W .17 740.08N 463.04W 872.91
I 3876 3559.02 3521.02 49 53 N 32.97 W .86 788.05N 494.67W 930.37
3957 3611.09 3573.09 49 55 N 33.11 W .14 839.90N 528.39W 992.22
[ 4042 3666.20 3628.20 49 55 N 33.86 W .67 894.S3N 564.52W 1057.71
4108 3708.62 3670.62 49 51 N 32.82 W 1.21 936.60N 592.21W 1108.07
4191 3762.21 3724.21 49 54 N 32.06 W .70 990.27N 626.32W 1171.66
4273 3815.05 3777.05 49 47 N 32.12 W .14 1043.35N 659.60W 12 3 4 . 3 0
I 4372 3878.41 3840.41 50 9 N 30.83 W 1.07 1107.70N 698.99W 1309.73
4470 3941.51 3903.51 50 10 N 31.53 W .55 1172.41N 738.15W 1385.34
[ 4536 3983.51 3945.51 50 19 N 31.60 W .26 1215.43N 764.58W 1435.82
4564 4001.54 3963.54 50 15 N 31.57 W .29 1233.93N 775.95W 1457.53
4655 4059.50 4021.50 50 7 N 31.74 W .20 1293.12N 812.45W 1527.05
I
SPE( '-SUN DRILLING SERVICES ( PAGE 2
ANCHORAGE ALASKA
ARCO ALASKA, INC. DATE OF SURVEY: 022895
WILDCAT/ALPINE #lA MWD SURVEY
501035051101 JOB NUMBER: AK-MM-950104
NORTH SLOPE KELLY BUSHING ELEV. = 38.00 FT.
COMPUTATION DATE: 4/ 7/95 OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
4691 4082.55 4044.55 50 5 N 32.28 W 1.15 1316.49N 827.06W 1554.61
I 4749 4119.98 4081.98 50 1 N 32.06 W .31 1354.33N 850.86W 1599.31
4815 4162.56 4124.56 49 53 N 31.98 W .23 1397.30N 877.73W 1649.98
4843 4180.37 4142.37 49 48 N 32.42 W 1.25 1415.16N 888.98W 1671.09
I 4937 4241.54 4203.54 49 39 N 33.05 W .54 1475.90N 928.02W 1743.29
4961 4257.12 4219.12 49 27 N 31.80 W 4.04 1491.33N 937.83W 1761.58
5056 4319.17 4281.17 49 9 N 33.83 W 1.65 1551.96N 976.92W 1833.72
I 5119 4360.27 4322.27 49 13 N 32.58 W 1.51 1591.80N 1002.99W 1881.33
5135 4370.55 4332.55 49 3 N 33.06 W 2.55 1601.79N 1009.44W 1893.22
5190 4406.43 4368.43 48 55 N 33.44 W .58 1636.29N 1032.06W 1934.47
I 5253 4447.57 4409.57 49 39 N 34.55 W 1.77 1675.93N 1058.79W 1982.27
5337 4502.59 4464.59 49 12 N 32.82 W 1.64 1729.38N 1094.42W 2046.50
5410 4548.76 4510.76 51 23 N 32.67 W 3.03 1776.15N 1124.49W 2102.10
I 5503 4607.50 4569.50 50 52 N 33.17 W .69 1837.32N 1164.10W 2174.98
5559 4642.55 4604.55 50 40 N 33.16 W .34 1873.26N 1187.59W 2217.92
I 5595 4665.88 4627.88 50 25 N 34.10 W 2.09 1896.87N 1203.29W 2246.27
5691 4726.61 4688.61 50 10 N 34.04 W .28 1957.46N 1244.27W 2319.40
5721 4746.03 4708.03 50 25 N 33.68 W 1.23 1976.89N 1257.30W 2342.78
5814 4804.47 4766.47 51 57 N 32.12 W 2.10 2037.89N 1296.75W 2415.43
5900 4857.41 4819.41 51 27 N 34.40 W 2.18 2093.92N 1333.50W 2482.44
5970 4901.29 4863.29 51 4 N 34.06 W .65 2139.15N 1364.27W 2537.13
I 6065 4961.79 4923.79 50 32 N 34.03 W .56 2200.64N 1405.82W 2611.32
6128 5001.48 4963.48 50 17 N 33.42 W .85 2240.57N 1432.47W 2659.32
6156 5019.52 4981.52 50 22 N 32.65 W 2.11 2258.81N 1444.33W 2681.08
6252 5080.73 5042.73 50 27 N 34.36 W 1.37 2320.52N 1485.19W 2755.08
I 6350 5142.40 5104.40 51 5 N 34.67 W .70 2382.76N 1527.98W 2830.58
6377 5159.52 5121.52 51 20 N 34.66 W .92 2400.29N 1540.11W 2851.88
I 6532 5255.51 5217.51 52 7 N 32.33 W 1.29 2501.75N 1607.24W 2973.54
6630 5315.33 5277.33 52 31 N 30.83 W 1.28 2567.75N 1647.80W 3050.98
6709 5363.12 5325.12 52 52 N 30.48 W .57 2621.71N 1679.78W 3113.66
I 6789 5411.74 5373.74 53 8 N 30.90 W .53 2677.19N 1712.72W 3178.14
6866 5458.29 5420.29 51 51 N 31.14 W 1.69 2729.19N 1743.98W 3238.79
6883 5468.83 5430.83 51 52 N 31.52 W 1.75 2740.66N 1750.96W 3252.21
I 6977 5527.09 5489.09 51 52 N 32.21 W .58 2803.71N 1790.15W 3326.43
7022 5555.00 5517.00 50 13 N 32.40 W 3.71 2832.88N 1808.60W 3360.95
I
I
[
5385.73
5455.14
5525.21
5594.24
5663.04
5026.59
5098.98
5171.53
5243.68
5314.79
4660.80
4735.47
4811.22
4885.79
4959.41
4272.93
4349.29
4426.52
4509.29
4585.89
3941.86
4017.48
4099.47
4176.60
4222.88
3632.75
3666.37
3724.84
3792.85
3867.56
3398.18
3417.21
3445.40
3509.91
3587.01
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 327.16 DEG.
HORIZONTAL DISPLACEMENT = 5663.18 FEET
AT NORTH 32 DEG. 26 MIN. WEST AT MD = 9940
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
2897.08W
2933.38W
2968.45W
3002.55W
3037.30W
2707.09W
2745.11W
2783.71W
2821.91W
2859.55W
2513.35W
2553.78W
2594.76W
2634.39W
2672.48W
2301.23W
2343.63W
2386.25W
2431.33W
2472.87W
2122.65W
2163.26W
2207.05W
2248.39W
2273.62W
1956.48W
1974.95W
2006.54W
2042.18W
2082.19W
1828.70W
1838.90W
1854.08W
1889.29W
1931.46W
4540.25N
4599.42N
4660.19N
4720.33N
4779.80N
4235.43N
4297.04N
4358.48N
4419.69N
4480.03N
3925.10N
3987.88N
4051.58N
4114.76N
4177.80N
3600.36N
3663.88N
3728.29N
3797.71N
3862.07N
3321.59N
3385.37N
3454.70N
3519.82N
3558.62N
3060.93N
3089.02N
3138.23N
3196.18N
3259.28N
2864.23N
2880.29N
2904.05N
2958.09N
3022.64N
.56
.68
1.93
1.28
.00
.27
1.15
.59
.43
.39
.41
.61
.70
1.36
.89
.92
.67
1.05
.28
.80
.93
.61
.48
.46
1.64
.76
1.33
2.15
.45
1.73
.98
3.10
2.81
.88
.61
N 31.90 W
N 31.15 W
N 28.82 W
N 30.30 W
N 30.30 W
N 31.09 W
N 32.27 W
N 32.01 W
N 31.93 W
N 31.97 W
N 32.83 W
N 32.73 W
N 32.79 W
N 31.39 W
N 30.89 W
N 33.38 W
N 34.08 W
N 32.90 W
N 33.09 W
N 32.59 W
N 32.73 W
N 32.24 W
N 32.31 W
N 32.51 W
N 33.57 W
N 32.97 W
N 33.68 W
N 31.71 W
N 31.48 W
N 33.27 W
N 32.93 W
N 31.93 W
N 33.22 W
N 32.95 W
N 33.36 W
VERT.
SECT.
DLS TOTAL
RECTANGULAR COORDINATES
DG/I00 NORTH/SOUTH EAST/WEST
COURSE
DIRECTION
DEGREES
DATE OF SURVEY: 022895
MWD SURVEY
JOB NUMBER: AK-MM-950104
KELLY BUSHING ELEV. = 38.00 FT.
OPERATOR: ARCO ALASKA INC
PAGE 3
48 58
48 42
48 12
47 45
47 45
51 19
50 46
50 15
49 50
49 29
54 4
53 30
52 50
52 13
51 29
55 40
55 26
55 16
55 1
54 24
54 9
54 33
55 2
55 26
55 7
51 51
51 58
52 19
52 39
53 24
49 58
50 2
50 19
51 1
51 32
COURS
INCLN
DG MN
7057.12
7117.82
7180.01
7242.29
7304.83
6756.79
6815.33
6875.12
6935.56
6995.94
6476.76
6531.43
6588.14
6645.30
6703.14
6205.21
6257.59
6310.96
6368.60
6422.80
5973.02
6027.25
6085.09
6138.61
6170.68
5738.34
5764.69
5810.15
5862.37
5918.60
5548.12
5564.09
5587.58
5640.42
5702.22
7095.12
7155.82
7218.01
7280.29
7342.83
6794.79
6853.33
6913.12
6973.56
7033.94
6514.76
6569.43
6626.14
6683.30
6741.14
6243.21
6295.59
6348.96
6406.60
6460.80
6011.02
6065.25
6123.09
6176.61
6208.68
5776.34
5802.69
5848.15
5900.37
5956.60
5586.12
5602.09
5625.58
5678.42
5740.22
9567
9660
9753
9846
9940
I
(
I
(
(
9099
9192
9286
9380
9474
I
I
I
[
I
I
(
(
(
(
I
(
I
I
I
8638
8731
8826
8920
9013
8165
8257
8351
/' 8452
8546
7760
7854
7954
8048
8104
7372
7415
7489
7575
7668
7070
7095
7132
7215
7314
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
('
SPE{ "-SUN DRILLING SERVICES
ANCHORAGE ALASKA
ARCO ALASKA, INC.
WILDCAT/ALPINE #lA
501035051101
NORTH SLOPE
COMPUTATION DATE: 4/ 7/95
(
(
(
(
(
(
(
I
(
I
I SPEr "-SUN DRILLING SERVICES ( PAGE 4
ANCHORAGE ALASKA
( ARCO ALASKA, INC. DATE OF SURVEY: 022895
WILDCAT/ALPINE #lA
501035051101 JOB NUMBER: AK-MM-950104
( NORTH SLOPE KELLY BUSHING ELEV. = 38.00 FT.
COMPUTATION DATE: 4/ 7/95 OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
I TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
(
1752 1752.32 1714.32 6.86 S 12.95 E .12
2752 2715.72 2677.72 186.68 N 90.48 W 36.72 36.60
I 3752 3479.15 3441.15 709.21 N 442.39 W 273.29 236.56
4752 4121.96 4083.96 1356.34 N 852.12 W 630.48 357.19
5752 4765.78 4727.78 1996.77 N 1270.55 W 986.66 356.18
6752 5389.24 5351.24 2651.44 N 1697.30 W 1363.20 376.54
7752 6006.02 5968.02 3315.77 N 2118.91 W 1746.42 383.22
8752 6581.92 6543.92 4002.08 N 2562.91 W 2170.52 424.10
I 9752 7217.03 7179.03 4659.23 N 2967.92 W 2535.41 364.90
9940 7342.83 7304.83 4779.80 N 3037.30 W 2597.17 61.75
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPE( Y-SUN DRILLING SERVICES t, PAGE 5
ANCHORAGE ALASKA
ARCO ALASKA, INC. DATE OF SURVEY: 022895
WILDCAT/ALPINE #lA
501035051101 JOB NUMBER: AK-MM-950104
NORTH SLOPE KELLY BUSHING ELEV. = 38.00 FT.
COMPUTATION DATE: 4/ 7/95 OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
1752 1752.32 1714.32 6.86 S 12.95 E .12
1838 1838.00 1800.00 7.94 S 14.38 E .14 .02
1938 1938.00 1900.00 7.88 S 14.95 E .17 .03
2038 2038.00 2000.00 .28 S 11.16 E .55 .38
2139 2138.00 2100.00 13.76 N 6.21 E 1.67 1.12
2241 2238.00 2200.00 33.38 N 1.22 W 3.86 2.20
2345 2338.00 2300.00 58.37 N 12.44 W 7.57 3.70
2451 2438.00 2400.00 87.90 N 28.44 W 13.07 5.51
[ 2558 2538.00 2500.00 120.74 N 48.30 W 20.20 7.12
2666 2638.00 2600.00 157.25 N 70.06 W 28.87 8.67
2777 2738.00 2700.00 195.48 N 96.56 W 39.16 10.30
I 2889 2838.00 2800.00 238.02 N 126.01 W 51.77 12.61
3005 2938.00 2900.00 285.26 N 160.58 W 67.67 15.89
3126 3038.00 3000.00 341.15 N 199.30 W 88.62 20.96
I 3253 3138.00 3100.00 406.46 N 243.21 W 115.91 27.28
3388 3238.00 3200.00 481.74 N 293.51 W 150.83 34.93
3534 3338.00 3300.00 569.91 N 350.85 W 196.00 45.17
3688 3438.00 3400.00 668.57 N 415.32 W 250.58 54.57
3843 3538.00 3500.00 767.14 N 481.07 W 305.62 55.05
I 3998 3638.00 3600.00 866.67 N 545.89 W 360.89 55.26
4154 3738.00 3700.00 965.91 N 611.06 W 416.12 55.23
4309 3838.00 3800.00 1066.35 N 674.04 W 471.21 55.09
4465 3938.00 3900.00 1168.82 N 735.95 W 527.21 56.00
I 4621 4038.00 4000.00 1271.23 N 798.91 W 583.58 56.37
4777 4138.00 4100.00 1372.55 N 862.26 W 639.40 55.82
I 4932 4238.00 4200.00 1472.41 N 925.75 W 694.33 54.93
5085 4338.00 4300.00 1570.09 N 989.02 W 747.79 53.46
5238 4438.00 4400.00 1666.65 N 1052.40 W 800.57 52.78
5392 4538.00 4500.00 1764.80 N 1117.22 W 854.98 54.41
I 5552 4638.00 4600.00 1868.61 N 1184.55 W 914.07 59.09
5708 4738.00 4700.00 1968.83 N 1251.91 W 970.85 56.78
5868 4838.00 4800.00 2073.80 N 1319.75 W 1030.95 60.10
I 6028 4938.00 4900.00 2176.68 N 1389.63 W 1090.53 59.58
6185 5038.00 5000.00 2277.60 N 1456.37 W 1147.51 56.97
I 6343 5138.00 5100.00 2378.28 N 1524.88 W 1205.09 57.58
[
I
I SPEf r-sUN DRILLING SERVICES ( PAGE 6
'" ANCHORAGE ALASKA
I ARCO ALASKA, INC. DATE OF SURVEY: 022895
WILDCAT/ALPINE #lA
501035051101 JOB NUMBER: AK-MM-950104
NORTH SLOPE KELLY BUSHING ELEV. = 38.00 FT.
I COMPUTATION DATE: 4/ 7/95 OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
I TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
I 6503 5238.00 5200.00 2482.73 N 1595.20 W 1265.90 60.81
6667 5338.00 5300.00 2593.16 N 1662.95 W 1329.57 63.67
I 6833 5438.00 5400.00 2707.07 N 1730.62 W 1395.57 66.00
6995 5538.00 5500.00 2815.39 N 1797.52 W 1457.46 61.89
7151 5638.00 5600.00 2916.57 N 1862.28 W 1513.78 56.32
I 7310 5738.00 5700.00 3020.31 N 1929.92 W 1572.96 59.18
7473 5838.00 5800.00 3127.06 N 1999.63 W 1635.00 62.04
7637 5938.00 5900.00 3238.33 N 2068.44 W 1699.68 64.67
I 7807 6038.00 6000.00 3353.05 N 2142.85 W 1769.08 69.41
7980 6138.00 6100.00 3472.73 N 2218.45 W 1842.40 73.32
8156 6238.00 6200.00 3593.99 N 2297.03 W 1918.14 75.74
I 8332 6338.00 6300.00 3715.01 N 2377.66 W 1994.62 76.49
8507 6438.00 6400.00 3835.21 N 2455.68 W 2069.37 74.74
8678 6538.00 6500.00 3952.02 N 2530.71 W 2140.46 71.09
I 8845 6638.00 6600.00 4064.74 N 2603.24 W 2207.70 67.24
9008 6738.00 6700.00 4174.41 N 2670.45 W .2270.64 62.94
9168 6838.00 6800.00 4281.16 N 2735.08 W 2330.56 59.92
9325 6938.00 6900.00 4383.84 N 2799.56 W 2387.72 57.17
9480 7038.00 7000.00 4484.07 N 2862.06 W 2442.49 54.76
9633 7138.00 7100.00 4582.06 N 2922.89 W 2495.14 52.66
I 9783 7238.00 7200.00 4679.79 N 2979.23 W 2545.91 50.77
9940 7342.83 7304.83 4779.80 N 3037.30 W 2597.17 51.26
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
I
I
I
I
I
I
(
(
(
(
(
I
(
I
Ii
II
J.
¡ ,
¡ J
It
II
-"~~-r~''''''-~--''''''-'''iø--'--'' - -----..--IiliO'..'-.-·-·.·-~····-=_~·--··,·~-'·-~iãlIo !
VERTICAL SECTION I
5ê77.26 FEET AT N 32 DEG 39 HIli H L'
..~,-!.~.!~~._,.., -~-,,~.-~.~._,,~~,_.,.-.- ,-- ~,- ~........"-, "'-..'-....-----,.~,-,.-...-,_.._ ,,,_,. '.'_~ _._._ ......,....'._.,___......'. _..._._...,...__...._~~~_.J
......f"'.("C.....~..--.i·...............'ft.~¿~. v_","", ,'_-*"...~,~~~.~...,...,....~~..'~,"~.....""......~ ·'1IW'¥',....""'~._,.....''''...............'''''....................._·M.....,~~~.~,.....,.......·;..............-..~-..................,...,...../Io.......--.-.....~,..,~
ï
I~
I r
J
~ ,¡
f
I
! .
II;
t
¡~
II
\ '
!
r'
::D1
--I:
ÞO-o-4 ¡,
-f!~
¡ ,
c:'Þ.
c,~
mIl,
¡¡
I.
I I
!
.
/'
,·-100
t 111III
I
-IIDD ~.,
:I: ,
I-- 'IOD~
0... ~
UJ
,I, C
-1
, a:
u
t-4 S!IOD1
I-- ~
(I a:: I
LLJ !
> ,
~ J
~,
I ,
I 73ij3.0__b _..
.. ." ,.--.----.,.--. ---~--,--.~99ij,O
- 9_- .. . .......__.........._.~__
T1OO':
j
17001
I
I
I
[
I ~' c
. =~=~~'SPERAy·~ ÙN"~~ÔFrILLTNG~~AV1CES=~=~'l.
I " VERTICAL/HORIZONTAL PROJECTION II
WILDCAT IA..PINE -lA STAAT TVD . 1752. S2 !.
SOl0!'S051101 FINISH TVD · 7!N2. 98 ~
I 022895 VERT SECT SCA..E IS 1200 fEET IIN ,,;
tamt SUPE tarT SECT SCFLE IS 2ODO FEET/IN ,;
I i ¡ ~
I 'I
, r
-IBJ ii
II
L
I ~~O;I
.,'
, .. .-..
o
..
HORIZfJNTRLD~nW-NY~~677. 26
-eaao
1..,_."._. ....__ ...1- ___",
......
....,~--.----........
I
I
I
I
I
I
I
I
I'
(
SSDS GEOMAG SHEET
SSDS Job # AK-MM-950 104
D~e lnlro5
Field Name WEST COLVILLE EXPLORATION
Lease/Block # N/ A
Rig Name POOL 6
Well Identificaton ALPINE NO. lA
Slot # N/A
Side track NO
Northings
Eastings
Latitude
5972482.250 ft*
375455.030 ft*
70:19:59.612 N*
151:00:37.253 W*
Longitude
Datum & Projection
[
(
[
I
(
I
I
I
I
Data Source
I SSDS MAGUTM
(y/n)
BGM 1992
Geomag. Values
Dip Angle (deg)
Total Intensity (nT)
Declination (deg)*
Convergence (deg)*
Office Generated
80.373
57183
27.885
N/A
SSDS District Supervisor
SSDS Lead Engineer
Signature
R;r1~,- _
,J)rç¡ ~
DWD ]ORPs
Version 2.1 March 1994
Field Generated
80.3 73
57183
27.885
N/A
(
If No, be specific;
Date
1/21/95
1/21/95
5per"'~V-5un
C'" LL..I N tI . . "VI c: . .
* Where appropriate
MWD End of Well Repol1
MWD End of Well Report
sperry-sun
þÞ'tIL.L..INO ..""Vle..
Service Interrupt Reports
('
AK·MM·95104
[
(
I
Section 6.
I
I
I
I
I
[
[
[
I
[
[
[
[
[
(
I
I
I
I
I
I
I
I
I
(
I
[
I
I
I
[
(
I
1
('
\
(
spel""'r"'v-sun
C....LLI N œ .....Vle:..
SERVICE INTERRUPT REPORT
There were no interruptions of service on well Alpine # 1 A.
MWD End of Well Report
I
I
I'
I
I
I
I
I
I
I
[
I
I
I
[
I
I
I
(
~I
('
5per'r'~-5un
CRILLING SERVIC:ES
5631 Silverado Way, Suite G
Anchorage, Alaska
99518
Tel. 907 -563-3256
Fax 907-563-7252
Telex N/A
"E JE=iÞ.A
Versatile Reporting Application
This report was produced using VERA version 2.0
--
--:.-~
.,; ;
,'-
ARCO Alaska, Inc.
AtlanticRichfieldCompany
TO:
Alaska Oil & Gas Consveration Commission
Attn.: Robert P. Crandall
3001 Porcupine Dr.
Anchorage Alaska 99501
FROM: Ms. Kelli A. Thibodeau A TO-1466
ARCa Alaska, Inc.
700 G. Street
Anchorage, Alaska 99510
(907) 265-6240
DATE: 18, April 1995
/~",
Transmitted herewith is the followinq data concerninq Alpine 1 1 A & 1 B:
LOGS:
1 Sepia Copy Displayed by EPOCH:
Alpine 1
Formation Log 211 = 100' (120· to 7500·)
Alpine 1A
Formation Log 211 = 100· (120· to 8940·)
Alpine 18
Formation Log 211 = 100'120' to 8850')
hAPE?-
1 ~. .Å.. Copy Displayed by EPOCH:
Alpine 1
Formation Log 211 = 100' (120' to 7500')
Alpine 1A
Formation Log 211 = 100· (120' to 8940·)
Alpine 1 B
Formation Log 211 = 100'120' to 8850')
If you have any questions please call me at (907) 265-6240.
Kelli
4'-f - 172-
95 - l~
q S - J-o
RETURN SIGNED COPY TO:
ARGO Alaska, Inc.
Attn.: Ms. Kelli A. Thibodeau-ATO-1466
700 G. -Street
Anchorage, Alaska 99510-0360
(907) 265-6240
RfCdll/Er
AI. APR 2 0 .
-Ira Úi, & ]9
Gas Co.
An ~4 G"
'C/¡orarrlS . '1/J111t>ì:J . .
~." y J'wll
~~
~~
Approved for transmittal by:
k C.N~ ~ FÞ\H
1 OF 1
F. M. Honeycutt
Manager, North Alaska Exploration
ARCO AlaSK~ Inc.
~
~~
C¡y
.~
/ .J
¡'V, VJ\JV
1, ! / V
..1t':::10 ¿.¿!flU fU'.'vV fU..J'\.¡JI'.i'\. ll''v
~Date: i It/
Time: _
M1CROfIL
)ate LIV ó I
'. .. ., . II ., I
, ., ,lit! .. I
, .. .. .- .
I " . .. I
: n:.II;;::
· U II _I' II .
· .... 'II ...
I ¡ ;: 111., I. I
I " .. . II .. I I
· .. II . " . .
· I' II . II II .
nUllIUI;
'I: :: II : IIII :,~
.. I. II . " II II
:UII:: II II :=
e IU: III :'11
U iii I'. .. ~ !!
1".lau KIIIII'
I11I
:1111
I.. ..1
. II "
FACSIMILE TRANSMISSION
..
.,
-
Number of Pages (Cover +): . ~
,~
r
.I
..,
Drill Site DeveJopment
P. O. BOX 100360
ANCHORAGE, AK 99510-0360
FAX # 907 265-6224
ATO..... 1'2. '9
From: Fí1 éll .Jotf /\/J,()¡../
Phone: (907) . ..1..' 0 -/Y?l-
Location; .
~
,
To: S Tt f/£. /11 /11/J/ Jr/J - /!()Cff.
Location:
FAX#:
Phone #:
Copies To:
,
Subject:
/Z1 b./ {), d I If. £C.ïlO/'lA- é J v¿ (./ F Y .£.~#o,£.", 4c. ,~//y é 4. /,f
Comments: 4rT4C/lø. /l-f(E: THé /'l4w¡J tJll?.r5.CTfGy/jt S'VA..I/tf't-f
!vA r)f-I!' /4v'INÆ :4k//! IS~ ð~/?<d-C/( q ¡VoT( TII-¿ #l~~.IoI¿ 14
SU¡r¿I/CY A.~Pü.eTI' û~¡:S /9-/.- /7,·~)·
/A,/ /-;../ CII I J' ¡-If ~
Tf IE - IN
;/r...,.ø / /-1 K:. . I
ßlO/~j
ro T;I;I-.E ~"'I ~ 1'::""""'-"'+(.., 4C-..Jl'/y'-r; ( w ¿c.. c....
¿'t1I/'1T IJ" ~'#ClWI"I' ON rHÆ .4c///'/<. I
Tlé
.s (,/1<.(/<. Ý
,I I'
/! t.ft?/L r.. . lis· I? CJ I (., ¡- IS: t/ R.. f=4- r ~
¿00;; C ~~\\fJ
'\ \<39&
~ ~t\ '\ \ \. . \\)~
éo\\\\t<''ir'1
. GaS Cons.
A\a~Ka 0\\ &. ,tð\cW'raQ&
_&{ {/\/ ' /,A/Ct.- C/1J~,;1
Any nroblems on translTJ.ìssions, call ~Ander~ or.
pelia Brown at 907/ ~Fi5-682~
. . ,
OR I GI ~JAt
...
.. 188b ¿:¿It'f,l AKl.,U ÁLA~1<.A l~l., HU. UJ:JU r. c./ U
,..--....-
S~~Y-5UN DRILLING S~RV!C~S PAGE 1
ANCHORAGE .~LASKA
~ ARCa ALASKA., INC. DATE OF SURVEY: 021695
WILDCAT/ALPINE NO. 1 MWD Sli'R.\rE:Y
501032021100 JOB NUMBER: AK-MM·950104
I NORTH SLOPE KELLY ÐUSHINC ELEV. = 3e.oO FT.
COMPUTATION DATE: 4/ 7/95 OPERATOR: ARca ALASKA INC
TRUE SUB-SEA COURS COURSE DLS TOTAL
I MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR coonDINATES 'lERT .
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
I 0 .00 -38.00 0 0 N .00 E .00 .OON .OCE .00
140 140.86 102.86 o 18 N 89.36 R .22 . CON .3aE .31
185 185.51 147.51 o 12 S .99 W .85 .08S .SOE .46
I 277 277.18 239.18 o 16 S 23.35 W .12 .11S .4.lE .53
368 368.00 330.00 o 14 S 42.45 E .31 .78S .46E .81
458 458.73 420.73 o 11 S 8.10 W .21 1.07S .56E 1.07
I 548 548.36 510.36 o 13 S 72.6~ E: .31 1.2'S .71E 1.30
638 638.48 600.48 0 8 N 22.89 E .29 1.22S .93E 1.45
722 722.73 684.73 o 13 N 4.~4 E -12 .97$ .98E 1.35
I 816 816.55 778.55 o 17 N 25.14 E .12 .s7S 1.lOB 1,23
900 900.13 862.13 o 11 N 84.39 E .30 .375 1.32E 1.30
992 992.98 954.98 o 32 S 7R.19 E .39 .148 1.9lE 1.82
I 1084 1084.35 1046.35 o 43 S 74.62 E .21 .68S 2.89E 2.77
1179 1179.90 1141.90 o Sl S 6EL 54 E .1B 1.13S 4.13E 4.05
1274 1274.14 1236.14 o S3 S 61.08 E .09 1.77S 5.42E 5.48
I 1367 J.366.99 1328.99 1 0 S 54.55 E .17 2.598 6.72E 7.02
1460 1459.99 1421.99 1 4 S 51_~r; E -10 J.61S O.07E 8.71
1564 1564.56 1526.56 1 12 S 63.93 E .27 4.71$ 9,B4E 10.78
I 1659 1659.34 1621.34 1 6 S 5C1. h9 E - 30 5.73S 11+44E 12.68
I 1}52 1752.32 17"14.32 l 14 S 55.52 E .18 6.865 12.96E 14 .5'[1
,. - - - - -
I 1851 1851.15 1613.15 1 6 S 49.34 E .18 6.09S 14.57E 16.60
1938 1938.30 1900.30 1 3 S 53_17 R ,10 9.1JS lS.BSE 16.24
2040 2040.54 2002.54 1 4 S 51.83 E -03 10.299 1 7 . 3 7E 20.15
2134 2134.48 2096.48 1 1 S 49.50 E .08 lJ..3BS lB.70~ ~1.86
I 2226 2226.51 2188.51 o 57 S 45.62 E .10 12 .458 19.B7E 23.44
2311 2311.51 2273.51 o 54 S 47.48 E .07 13.418 20.88E 24.80
2405 2405.69 2367.69 o 54 S 48.37 E .02 14.40S 21.9SE 2G.28
I 2499 2499.49 2461.49 o 50 S 51.16 E .08 15. 32$ 23.07E 27.69
2598 2598.54 2560.54 o 49 S 55.33 E .06 16.1SS 24.2~E ~9.13
2693 2692.84 2654.84 o 47 S 55.86 E .04 16.935 25.31E 30.45
I 2786 :2786.22 2748.22 o 40 S 58.06 E .13 17.5BS 26.31E 31.64
:a880 2880.22 2844.22 o 34 S 58.39 F 10 18.1JS 27.1SB ~2.G7
2973 2973.47 2935.47 o 31 S 60.24 E .07 18.58S 27.95E 33.56
I 3068 3067.98 3029.98 o 22 S 73.90 E . 1 q 18_S8S :2 e. 62E :3-4.20
3161 3161.33 3123.33 o 22 S 60.16 E .10 19.11S 29.18E 34.88
I RECE\VEO
I
ORIGINAL PR 11 1995
~ . S5\\>\\
I comm\
81aska on ~ Gas Cons.
_. - -- 'Anchorage
l. l~Yb ;¿:¿¿PM AKCU ÁLA:)¥,A !~C l~O. U,jOIJ t, j/O
~
~,
f tRY-SUN DRILLING SERVICES PAGE 1
ANCHORAGE ALASKA
j ARCa ALASKA, INC. DATE OF SURVEY: 022895
WILDCAT/ALÞINE ffl^ MWD SURVEY
.. 501035051101 JOB NUMBER: AK-MM-950104
I NORTH SLOPE KELLY BUSHING ELEV. ~ 38.00 FT.
COMPUTATION DATE: 4/ 7/95 OPERATOR: ÄRCO ALASKA INC
. TRUE SUB-SEA COURS COURSE DLS TOTAL
I MRASD VRR7ICAL VERTICAL INCLN DIREC'.L· .LON RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG ~.N DEGREES DG/100 NORTH/SOUTH EAST/WEST S~CT.
ì 1752 1752.32 1714,32 1 14 S 55.52 E .00 6.86S 12.95E -12.79
1805 1904.87 1756.67 1 10 S 52.;¿1 E .19 7.51S 13.S4E -13.82
1876 1876.30 1838.30 1 23 S 46.69 E .35 8.555 lS,05E -1'5,35
ì 1971 1970.78 1.932.76 4 25 N 31.:j9 W 6.12 6.225 13.98E -12.81
2066 2065.93 2027.93 7 43 N 19.22 W 3.68 3.02N 9.94E ~?.e5
2151 2155,72 2117.72 10 4S N 19.01 W 3.32 16.82N 5.16E 11_3~
ì 22$~ 2247.23 2209.23 13 52 N 22.:1& W 3.46 35.43N 2.07W 30.89
2345 2338.14 2300.14 17 6 N 25.40 W 3.48 5B.39N 12.44W 55.AO
2-137 2425.47 2387.47 19 45 N 30.~3 W 3.38 84.02N· 26.15W 84.78
I 2531 2513.14 2475.14 21 33 N 31.43 W 1.95 112.3GN 43,18W 117.82
2625 2600.24 2562.24 23 22 N 30.66 W 1.95 143.22N 61.741'1 15.3.81.
. 2720 26SG.G2 2548.62 24 51 N 3':¡.05 W 2.46 17S.65N 82.74W 192.44
2813 2770.61 2732.6~ 26 48 N 34,10 W 2.15 209.13N lOS.sOW 233_08
2907 2853.9J 2B15.93 28 57 N 36.:j~ W 2.52 245.12N 131.23W 277.11
3002 2935.01 2897.01 32 6 N 36.07 W 3.36 283.71N 159.47W 324.85
I 3093 3011,41 2973.41 35 7 N 34.03 W 3.50 325.30N 188.60W 375.59
3188 3087.05 3049.05 36 22 N 33.98 W 3.44 37~.12N 220.1BW 432.05
3281 3158,64 3120.84 40 45 N 33.51 W 2.58 421.43N 253.12W 491.35
I 3374 3227.75 318.9.75 43 46 N 34.06 W 3,31 473.51N 287.97W 554.00
3469 3294.34 3256,34 46 35 N 32.89 W 3.08 529.46N 324.95W 621.0¡;
. 3555 3352.07 3314.07 49 35 N32.20 W 3.52 583.70N 359.55W 685.40
3639 3406.42 336e.42 49 SO N .33.e3 W 1.51 637.47N 394.49W 749.52
3721 3458.95 3420.95 49 52 N 33,67 W .16 6a9.26N 429.10W 811_81
3801 ~510.5J 3472.53 49 47 N 3.3.~1 W .17 740.08N 463.04W 872.91
I 3876 3559.02 3521.02 49 S3 N 32.97 W .86 i88.0SN 494.67W 930.37
3957 3611.09 3573.09 49 55 N 33.11 W .14 839.90N 528.39W 992.22
I 4042 3'66,20 JG2S.20 .;9 55 N 33.86 W .67 894.S3N 564.S2W 1057.71
4108 3708.62 3670.62 49 51 N 32.82 W 1.21 936.60N 592.21W 110a.07
419~ 37G:!.21 3724.2~ 49 54 N 32.06 W .70 990.27N 626.32W 1171.66
4273 3815.05 3777.05 49 47 N 32.12 W .14 1043.35N 659.60W 1234.30
I 4372 3878_41 3840.41 SO 9 N 30.83 W 1.07 1107.70N 698.99W 1309.73
4470 3911.5l J90J.!)1 ~o 10 N 31.53 W .55 l172.41N 738,15W 138S.34
I 4536 3983.51 3945.51 50 19 N 31.6Q W .26 i215.43N 764.58W 1435.82
4564 4001.54 3~GJ.54 50 15 N 31.57 W .;¿~ 1233.93N 775.95W 1457.53
4655 4059.50 4021.50 50 7 N 31.74 W .20 1293.12N B12.45W l527.05
I RECE\\JE[)
I OR\G\NAL APR 11 1¡995
. \SSiv"
Alaska on & Gas ljons. L¡\,i\i\ln
I Anchorage
".00 "\ 1 1QQr,;
P-íf\ ! \ rJv0
Alaska 011 & Gas 1.IlHiS. \.JUiÜí\W6'6iv"
Anchorage
R E C r s V ~- r·
_ r , ~ t ¡
.'t., , ~ ~ J (. tJ
3178.14
3236.79
3252.21
3326.43
3360.95
1712.72W
1743.9BW
1750.96W
1790.15W
1808.6QW
;¿j82.76N
2400.29N
~~Ol.75N
2567.75N
:.¿621.71N
"4.677.19N
2729.19N
;¿740.66N
2803.71N
~83~L t3SN
1527.~aw 2830.58
1540.11W 2851.88
1607.24W 2973.54
1647.80W 3050.98
1679.78W 3113.66
1675.93N l058.79W 1982.27
1729.38N l094.42W 2046.50
1776.15N 1124.49W 2102.10
1837.32N 1164.10W 2174.98
1873.26N 1187.59W 2217.92
1896.87N 1203.29W 2246.27
1957.46N 1244.27W 2319.40
1976.89N 1257.30N 2342.78
2037.89N 1296.75N 2415.43
2093.92N 1333.50W 2482.44
2139.15N 1364.27W 2537~13
2200.64N 140S.B2W 2611.32
~240.57N l432.47W 2659.32
22S8.81N 1444.33W 2681.08
;¿J20.52N 1485.19W 2755.08
1554.61
1599.31
1649.98
1671.09
1743.29
1761.58
1833.72
1881.33
1693.22
1934.47
l491.33N 937.83W
lSSl.96N 916.92W
1591.80N l002.99W
1601.79N l009.44W
1636.29N· l032.06W
827.06W
850.86W
877.73W
a8e.9SW
928.02W
l316.49N
1354.33N
l397.30N
141S.16N
1475.90N
P"\ r) I r'\ 1 i'\ 1 ¡\ L
U.'\'= If_l\¡\ f\
. \ \ v . \ \ J~
.53
1.69
1.75
.58
3.71
.70
.92
1..29
1.28
.57
.6~
.56
.85
2.11
1.37
N 30.90 W
N 31.14 W
N 31.52 W
N 32.21 W
N 32.40 W
53 e
51 51
51 ~2
51 52
50 13
51 ~ N 34.67 W
51 20 N 34.66 W
52 7 N 32.33 W
S2 31 N 30.83 W
52 ~2 N 30.48 W
::il 4 N 34.06 W
50 32 N 34.03 W
50 17 N 33.42 W
50 22 N 32.65 W
50 27 M 34.36 if
N 34.10 W 2.U='
N 34. 04 W .2 B
N 33.58 W 1.~J
N 32.12 W 2.10
N 34.40 W 2.16
J..?ï
1.64
3.03
.69
.34
N 34.55 W
N 32.82 W
N 32.67 N
N 33.17 W
N 33.16 19'
~o 25
50 10
!jO 25
Sl 57
51 27
49 39
49 12
~1. 23
50 S2
~o 40
4$ 27 N 31.60 W 4.04
49 9 N 33.83 W 1.65
49 13 N 32.58 N 1.51
49 3 N 33.06 W 2.55
48 55 N 33.44 W .58
1.15
.31
.23
1.25
.54
so ~ N 32.2ð W
50 1 N 32.06 W
4~ 53 N 31.98 W
49 48 N 32.42 W
4!î J9 N 33.05 W
DAT~ OF SURVEY: 022895
MWD SURVEY
JOB NUMBER: AK-MM-950104
KELLY BUSHING ELEV. = 38.00 FT.
OJ!~.RATOR: ARCO ALASKA INC
COURS COURSE DLS TOTAL
INCLN DIRECTION RECTANGULAR COORDINATES
DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
i)
Ð
TRUE S'Cæ-SBA
ß MEASD VERTICAL VERTICAL
Ð DEPTH DEPTH DEPTH
ß
IJ
I
I
I
I
I
I
I
I
I
I
I
I
I
5373.74
5420.29
5130.a3
5489.09
5517_00
5101.40
5121.52
5217.51
5277.33
5325.12
4863.29
4923.79
-19&3.46
4981.52
5042.73
4627.60
4688.61
4709.03
4766.47
4919.41
440!).57
4464.59
4S10.7G
456.9.50
4604.55
121!L 12
4281,17
4322.27
4332.55
4368.4:3
4011.55
4081.9B
41~1.S'
4142.37
4203.54
1/ 7/:;5
5411.71
5458.29
5468.83
5527.09
5555.00
E142.40
5159.52
5255.51
5315.33
5363.12
4901.:29
4961.79
5001..49
5019.52
5080.73
4665.88
4726.61
4746.03
4804.47
4B57.11.
4447.57
4502.59
4549.7&
4607.50
4&42.56
4257.12
4319.11
43,o.27
4370.55
4406.13
4082.55
4119.98
4162.56
4180.3'7
4241.54
ri789
6866
~aB3
6977
70'-'
6~;O
6377
65:12
6630
fi709
5970
6065
h128
6156
~'-;2
5595
5691
5721
5814
5900
5251
5337
5410
5503
5559
4961
5056
5119
5135
5190
4691
4749
4815
4643
4937
ARca ß.T.ASn, INC.
~ILDCAT/ALPINE #lA
501035051101
NORTH SLOPE
CO~PUTATION DAT~:
---
¡. 1 \;I 8 0 ¿ : ¿¿rill }\. K l, V }o. LA;' 1\}\' 11~ l,
S~RY-SUN DRILLING SERVICES
/ ANCHORAGE ALASKA
PAGE 2
no. U J ~ U [ . '1/ 0
l. 1 ~~O ¿: ¿Jrm AKl.V kLk~~.A 11'1L ~
S~~RY-SUN DRILLING SERVICES
> ANCHORAGE ALl\SKA
riO, UJJU t', bib
PAGE 3
AACO Þ.T.lASKAr INC.
WILDCAT/ALPINE #lA
$01035051101
NORTH SLOPE
COMPLITATION DATE: 1/ 7/~S
UATE OF SURVEY: 022895
MWD SURVEY
JU~ NUMBER: AK-MM-950104
KELLY BUSHING ELEV. = 38.00 FT.
O~r.;KATOR: ARCO ALASKA INC
~
-
I
I
I
m
m
I
IJ
IJ
II
II
II
II
IJ
IJ
IJ
(]
TRUE SUB - SEA COURS COURSE DLS TOTAL
MBASD VERTICAL VERTICAL I~CLN DIRECTION RECTANGULAR COORDINATES VERT.
DBPTH DEPTH D~PTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
"70'10
7095
7132
7215
7314
7372
7415
7489
7575
7G68
7"0
7854
7964
8048
8104
9165
8257
8351
8452
8546
BS3e
8731
8826
8920
9013
9099
9192
è}?8b
93BO
9474
95(0;7
9660
97!i3
9846
994(')
558'.12
5602.0g
5G25.58
5678.42
5740.22
5776.34
5802.69
5848.15
5900.37
S95'.£0
601.1.0~
6065.25
6123.09
6176.61
6208.68
b213.21
6295.59
634B.96
6406.60
6460.80
6514.76
65Ei9.43
'626+11
6683.3Q
6741.11
6794.79
6853,33
6913.~2
6973.56
7033.94
'7095.12
7155.82
721.a.OJ.
7280.29
7342.93
5548.12
5564.09
55B7.50
5640.42
570:2.2~
57JEL 34
5764.69
591.0.15
5862.37
5~16.GO
5~TJ . 02
6027.25
G005.09
6138.61
G1.70.GS
6205.21
6257.59
G310.~G
6368.60
(;422.80
6476.76
6531.43
6588.14
6645.30
G703.1.4
6756.79
6815.33
6975.12
6935.56
6.996.94
7057.:1.2
7117.82
7190.01
7242.29
7304.a3
49 ~6 N 32.93 W .9B
50 2 N 31.93 W 3.10
~o 19 N 33.22 W 2.~l
51 1 N 32.95 W .ae
51 32 N 33.36 W .ó1
51 51 N 32.97 W .16
51 58 N 33.68 W 1.33
~2 19 N 31.71 W 2.1~
52 39 N 31.48 W .45
~:3 24 N 33.27 Pi 1..'13
54 9 N 32.73 W
54 33 N 32.24 W
55 2 1'1 32..31 W
55 26 N 32.51 W
55 7 N 33.57 W
.~3
.61
.48
.46
1.b4
2864.23N 182B.7DW 3398.18
28S0.29N 1838.90W 3417.21
2904.05N 1854.0BW 3445.40
2958.09N 1889.29W 3509.91
3022,64N 1931.46W 3587.01
3060.93N 1956.48W
30B9.02N 19Î4.95W
3138.23N 2006.54W
3196.18N 2042.18W
3259.28N 2082.19W
3632.75
3666.37
3724.84
3792.85
3867.56
55 40 N 33.38 W
55 26 N 34.08 W
~~ 16 N 32.90 W
55 1 N 33.09 N
54 24 N 32.5' W
.~2
.67
l.OS
.28
.80
3321.59N 2122.65W 3941.86
3385.37N 2163.26W 4017.48
3454.70N 2207.05W 4099.47
3519+S2N 2248.39W 4l76.60
3558.62N 2273.62W 4222.68
J600.36N 2301,23W 4272.93
3663.88N 2343.63W 4349.29
3728.29N 2386.2SW 4426,52
3797.'lN 2431.33W 4509.29
3B62.07N 2472.87W 4585,89
392S.10N 2S13.35W 4660.80
39S7.88N 2553.78W 4735.47
4051.5BN 2594.76W 4811.22
4114.76N 2634.39W 4885.79
4177.80N 2672.46W 4959.41
4235.43N 2707.09W 5026.59
4297.04N 2745.11W 5098.98
4J5B.48N 2i83.71W 5171.53
4419.69N 2S2l.91W 5243.68
44eO.03N 2B59.S5W 5314.79
4540.25N 2897.0BW 5385.73
4599.42N 2933.38W 5455.14
46bO.l9N 296B.45W 5525.21
4720.33N 3002.55W 5594.24
477~-~ON 3037.30W 5663.04
THE CALCULhTION VRocnDURES ARE BASED ON THE USE OF r
THREE-DIMENSION MINIMUM CURVATURE METHOD. R E C E tV E t)
HORIZONTAL DISPLACEMENT ~ 5663.18 FEET
AT NOR'I'H 32 DEG. 26 MIN. WEST AT MD ~ 9~40 A.PR .¡ î 1395
VERTICAL gECTION RELATIVE TO WELL HEAD Alaska Oil & Gas I."ûns. GUHÜ\\\'S'':;'I\,J\'
VERT!CAL SECTION COMPUTED ALONG 327.16 DEG. Þ.nchnrag&
1,,",\11' f, L
OR\b\t'~lA
~4 ..
53 30
!j2 50
52 13
~1 29
N 32.63 W .41
N 32.73 W .61
N 32.79 tv .70
N 31.39 w 1.36
N 30.89 tl .89
~:1. 13 N 31.09 N .2'l
50 46 N 32_27 W 1.l5
50 l~ N 32.0~ W .59
49 50 N 31.93 W .43
4~ 2~ N 31.97 W .39
40 sa
48 42
40 12
47 45
47 45
N 31.90 VI
N 31.15 W
N 28.82 W
N 30.30 W
N 30.30 W
.SEi
.68
~.93
1.28
.00
J. 1 tI~b'¿': ¿: ¿1t'f.l-N'r'" AKLU ALA::'KA l~l",·
I . I , l~.
r-
550'
~'
¥
. -
I ICE PAD UMITS ~
33.5'
~ 222' ~
ALPINE 11 I '
550'
.,T
~Um~G STORAGE
~~~ 252'
- ""'----Poo
~
J
~..
(0
N
Iê.V 1.1#<1.
;
I
~i
b/bN
Scale
ALPINE IfI
LOCA TED Wlll-IIN PR01RAC1ED
SEC. 1, TWP. 11 N., ~GE. 4 E.
UMIAT MERIDfAN
LAT. = 70· 19' 59.612-
LONG. ~ 151- 00' 37.253-
1,468' F.S.L, 2,248' F, W.L.
y = 5?g72.482.25
)( = 375,~55.03
GROUND ElEV,- S'
TOP ICE PAD ElEV,= 7.6'
NOTCS
1. BASIS OF HORiZONTAL LOCA 710N AND £lEVA 1IfJII
IS U.S G.s. MONUMENTS ct...EAR II aAQI(.
2. COORDlNI11ëS SHDWN ARE ALA#A STA 1£ PLANE
ZONE 4, NoAO. 27.
J. DATE OF SUR~ t/fJ/Ø5.
4. aEYA T1ON$ SHOWN A/f£ S.P.M.s.!.
¿gÇF....~~
,¡.::_~\C~___~. _,n*_,_~_....~\.._ SlJRVEYOR'S ~ER77F1CATE.
f 4<;1; I HEREBY 1:Ø7FY THA T I AM PIIOPERL Y RëfJlS1Ðtl:1J AND
~ J í2. UCENSEIJ 7D PRAC11Œ LAND SlJR'Æ:'f1NfJ IN 71E "'TA 7r' OF'
! ~, - ~--vr' .. .--- Al.A~ AND THA T 'THIS P/.A T REPRESDI'TS A SUR~
~ ALAN J. ROOkUS' IXJNE SY ME OR UNDER MY aR£~T !lJPER'ASltJN AND
THA T AlL DIMENSJONS AND OTHER DETAILS ARE CORRECT
AS OF elAN '3. 19J4
'\ 'iPf~ v , 'i:J~
\' ~'fJ~
p.?~' \I~~~
C()\\~·
. ~IS~'ð.& - ~tð
~S~~\\ " ,~t,\\Q.._
- .
ß LOUNSBURY
at: AEOCIATlS. INC.
_ .~.... p~ IÐØIMII
XXX)(
ALPINE 11 EXPLORATORY WELL
CONDUCTOR. ICE PAD
AS-BUIL T
. stET:
-
W1
ARCa Alaaka, Inc. 0
Suþetdtary of Atlantic Richfield Company
CAOD Fn...£ NO..
601 7
. 00 I
'...
,.-.,
----~~.
ARCO Alaska, Inc.
AtlanticRichfieldCompany
~~
~~
TO:
Alaska Oil & Gas Consveration Commission
Attn.: Robert P. Crandall
3001 Porcupine Dr.
Anchorage Alaska 99501
FROM: Ms. Kelli A. Thibodeau ATO-1466
ARCO Alaska, Inc.
700 G. Street
Anchorage, Alaska 99510
(907) 265-6240
DATE: 11, April 1 995
-.
Transmitted herewith is the following data concerninq Alpine 1:
API # 501032021100
.~ Alpine 18
, ~ 1 Wireline Tops as Displayed by ARCO Alaska Inc
~1 Copy MWD End of Well Report as Displayed by Sperry-Sun
TAPES:
~ Alpine 1 A
~1 LDWG Formatted 611 Open Reel 1600 BPI Tape- MPT GRC EWR CNP SFD Rap
~~ 4/10/95 as Displayed by Sperry-Sun
1 Paper Copy LIS Verification Displayed by Sperry-Sun
Alpine 1 B
~ 1 LDWG Formatted 611 Open Reel 1600 BPI Tape- MPT GRC EWR CNP SFD ROP
~ r 4/10/95 as Displayed by Sperry-Sun
~ 1 Paper Copy LIS Verification Displayed by Sperry-Sun
--;.;
If you have any questions please call me at (907) 265-6240.
Kelli
<
.J.
~
~
RETURN SIGNED COPY TO:
ARGO Alaska, Inc.
Attn.: Ms. Kelli A. Thibodeau-ATO-1466
700 G. Street
Anchorage, Alaska 9951 0-0360
(907) 265-6240
I
Approved for transmittal by:
~ (. Jj~ 6(1"> FÞ/-H
F. M. Honeycutt
Manager, North Alaska Exploration
APR 2 0 1995
t\llska 011 & Gas Cons. Commlss"
Anchorage Jon
2 OF 1
--
~,-.
/_--
. \
ARca Alaska, Inc.
AtlanticRichfieldCompany
~...
~~
TO:
Alaska Oil & Gas Consveration Commission
Attn.: Robert P. Crandall
3001 Porcupine Dr.
Anchorage Alaska 99501
FROM: Ms. Kelli A. Thibodeau ATO-1466
ARCO Alaska, Inc.
700 G. Street
Anchorage, Alaska 99510
(907) 265-6240
DATE: 18, April 1995
Transmitted herewith is the followinq data concerninq Alpine 1:
API # 501032021100
RECEIVED
C;¡Q-/7 2- APR 2 0 1995
Alaska Oil & Gas Cons. Commission
Anchorage
LOGS:
1 Sepia Copy Displayed by Sperry-Sun:
Alpine 1
~ DGR EWR4 ROP - 211 & 511 (120' to 7500')
~Alpine 1A
.~ q, DGR EWR4 ROP - 2" & 5" (1700' to 7340') TVD OJ ~ /p
~ DGR EWR4 ROP - 211 & 5" (17001 to 99401) MD {::J ~- ()
Alpine 1 B
~ DGR EWR4 ROP - 211 & 5" (1700' to 7500') TVD
~ DGR EWR4 ROP - 211 & 5" (1700' to 88001) MD
1 Paper Copy Displayed by Sperry Sun:
~pine 1
DGR EWR4 ROP - 2" & 5" (120' to 75001)
~pine 1A
- DGR EWR4 ROP - 2" & 5" (1700' to 7340') TVD
~ DGR EWR4 ROP - 2" & 5" (1700' to 9940') MD
Alpine 1 B
"--- ~ DGR EWR4 ROP - 2" & 5" (1700' to 7500') TVD
~ DGR EWR4 ROP - 2" & 5" (1700' to 8800') MD
REPORTS:
Alpine 1
-::::::i 1 Wireline Tops as Displayed by ARCO Alaska Inc
-~ 1 Copy MWD End of Well Report as Displayed by Sperry-Sun
1 Copy Core Analysis Report-CL File No. BP-3-1572 as Displayed by CORE
LABORATORIES (Including 3.5" Diskette Containing Files AR1572DS.WK3 &
AR1572SW. WK3-07 -APR-95)
Alpine 1 A
~ 1 Wireline Tops as Displayed by ARCO Alaska Inc
~ 1 Copy MWD End of Well Report as Displayed by Sperry-Sun
crs=- 20
1 OF 1
,~.
0;:;--- (g
RECE\VED
API #:
ARca Alpine #1A
50-103-20211-01
APR 2 0 1995
Location: Surface:
WKE 92-02, sp. 1360
ASP: x=375,455 y=5,972,482 zone:4
Lat.: 70.333225 N Long: 151.010348 W
S/T/R: 14681 FSL, 22481 FWL, sec 1, T11 N, R4E
AI k on & Gas Cons. Commission
as a Anchorage
BHL: ASP: x=372,494 y=5,977.311 zone:4
Lat.: 70.346280 N Long: 151.035033 W
S/T/R: 96T FSL, 7901 FEL, sec. 35, T12N, R4E
Geological Tops:
Base Permafrost
Top West Sak
Top Schrader Bluff
C-40/K -1 0
C-30/K-5
C-20
K-3
K-2
Top Albian B
Top Albian C
HRZ
K-1
LCU
Top Jurassic J4
Total Depth (driller)
MD
8351
10101
13101
21831
23961
28001
4290·
46271
62401
71491
90931
93631
95081
96381
99401
SS
-79T
-9721
-12721
-21431
-23481
-27201
-37861
-40021
-50321
-55961
-67531
-69241
-70181
-71031
-73351
Conventional Cores:
none
Logging Runs:
MWD gamma ray/resistivity: surface to depth
MWD gamma ray/resistivity/neutron/density : depth to TO
Mudlog: surface to TO
Sidewall Cores:
none
RFT:
none
OR1GINAL
r-.-
-
~ -------............
Facsimile Cover Sheet
To:
Company:
Phone:
Fax:
From:
Company:
Phone:
Fax:
Email:
HOWARD OKLAND
Alaska O&G Conservation Comm.
907 -279-1433
907 -276-7542
Timothy J. Ryherd
Alaska D.N.R. - Div. of Oil & Gas
(907)762-2140
(907)562-3852
74222.2332 @compuserve.com
Date: 4/3/95
Pages including this
cover page: 1
Larry:
At your earliest convenience please prepare the following well data for me:
· Shell BF-47 (Seal 1) #1 (83-0074)--well history, completion report, drilling permit, horizon picks,
directional surveys, core descriptions, core analyses, production test summaries and production test
detailed reports (NO WELL LOGS NEEDED AT THIS TIME).
· Shell BF-57 (Seal 3) #1 (84-0093)--well history, completion report, drilling permit, horizon picks,
directional surveys, core descriptions, core analyses, production test summaries and production test
detailed reports (NO WELL LOGS NEEDED AT THIS TIME).
· ARCO Pt Mcintyre #P1-12 (AKA: Pt. Mcintyre #11 )(91-0013)--all well logs, well history, completion
report, drilling permit, horizon picks, directional surveys, core descriptions, core analyses, production
Jest suf))IQ . s and production test detailed reports.
~ ARCO ~Ipine #1 94-0172)--all well logs, well history, completion report, drilling permit, horizon picks,
~directio.. na .eys, core descriptions, core analyses, production test summaries and production test
tailed repO~(CONFIDENTIAL WELL DATA).
./A' · ARC00AJPine #1A 95-00"--all well logs, well history, completion report, drilling permit, horizon
((~' picks IrecLiulJa surveys, core descriptions, core analyses, production test summaries and production
t detai e orts (CONFIDENTIAL WELL DATA).
ARCO . Ipine #1 95-0020)--all well logs, well history, completion report, drilling permit, horizon
picks, direc . surveys, core descriptions, core analyses, production test summaries and production
test detailed reports (CONFIDENTIAL WELL DATA).
When this data is available for me to pick up, please give me a call.
Sincerely,
to-
¿
Tim Ryherd
ARCO Alaska, I[
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
TRANSMITTAL
TO:
State of Alaska
AOGCC
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn- Robert P. Crandall
DATE: March 23, 1995
AIRBILL: Airland # 646244
AFT#' ABV05-03-23-01
CHARGE CODE# AX9329
OPERATOR- ARCO Alaska INC. NAME' Various Alpine wells
SAMPLE TYPE: Ditch cuttings NUMBER OF BOXES: 11 boxes
SAMPLES SENT:
Alpine #1 - Alpine #lA Alpine #lB
I 20-7500' 1800-9940' 1800-8850'
SENT BY: Dan Przywojski
UPON RECEIPT OF THESE SAMPLES, PLEASE NOTE ANY DISCREPANCIES AND MAIL
A SIGNED COPY OF THiS FORM TO'
RECEIVED BY'
Arco Alaska, Inc.
619 E. Ship Creek Ave
Anchorage, AK. 99510
Attn: Suite 104
DATE'
AR3B-6003-93 242-2603
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 278 1215
March 20, 1995
David W. Johnston, Chairman
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501-3192
Re: Well Completion Report Form 407
ARCO Alpine #lA Permit No. 95-18
Dear Commissioner Johnston,
Attached is the Well Completion Report, Form 407, for the Alpine #lA well. The
Alpine #lA well was a directional hole drilled from below the Alpine # 1 surface
casing at 1765' to a total depth of 9940'MD, 7343' TVD. The well was than again
plugged back to the 13-3/8" surface casing prior to drilling the Alpine #lB sidetrack.
Included with the Form 407 are the "as built" survey showing the surface location, a
well bore diagram showing the P&A status of the well, and daily drilling report
summaries. The geologic information will be submitted under separate cover.
If you have questions or require additional information, please contact Fred Johnson
at 265-1492.
Sincerely,
Fred Johnson
Drilling Engineer
~XR 2 2 1995
Oil & 6as Cons. ~mmis¢on
~chorage
AR3B-6003-93 242-2603
STATE OF ALASKA
J "..1\ OIL AND GAS CONSERVATION COMfvltvòlON
WELL COMÞ1.ETION OR RECOMPLETION REPORT AND LOG
,-'"
1 Status of Well
Classification of Service Well
OILD
2 Name of Operator
ARCO Alaska, Inc
3 Address
GAS D
SUSPENDED D
ABANDONED ŒJ
SERVICE D
P.O. Box 100360, Anchorage, AK 99510-0360
4 Location of well at surface
1468' FSL, 2248' FWL, SEC 1, T 11N, R4E, UMrEõr~·f.~.¡_~,E~,TfO"j1 (.ir-",~~,.. ...... .
At Top Producing Interval i ') ", TEl:: LOCA ~~"
773' FSL, 678' FEL, See 35, T12N, R4E, UM 'I, 3{4~, .~,:,: .f.. v'}~'~. t1£i). ~',.,.
AtTotal Depth j \Ju\U-¡ED f tl!.-£ ~h
967' FSL, 790' FEL, SEC 35, T12N, R4E, UM \--~-1 ;j~';. ....,. ~..
5 Elevation in feet (indicate KB. OF, etc.) 6 Lea;e Dèsignation and Se~;;":.1.A:'~·~::.,:·:~~
7 Permit Number
95-18
8 API Number
50-103-20211-01
9 Unit or Lease Name
EXPLORATION
10 Well Number
ALPINE #1 A
11 Reid and Pool
WILDCAT
RKB 38'
12 Date Spudded
18-Feb-95
17 Total Depth (MD+ TVD)
9940' MD, 7343' TVD
13 Date T.D. Reached
26-Feb-95
18 Plug Back Depth (MD+ TVD)
1645'
ADL 25530
14 Date Comp.. Susp. or Aband.
3-1-95 Abandoned
19 Directional Survey
YES ŒJ NO D
/15 Water Depth, If offshore 116 No. of Completions
NA feet MSL NA
20 Depth where SSSV set 21 Thickness of permafrost
NA feet MD NA
22 Type Electric or Other Logs Run
LWD logs - GR, RES, Neutron. Density (No wire line logs)
23
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE
WT
GRADE
TOP
BTM
HOLE SIZE
CEMENT ÆCORD
20"
13.375"
94#
68#
B
L-80
SURF
SURF
110'
1765'
26"
16"
350 SX ASI
350 SX ASIII & 650 SX ASI
24 Perforations open to Production (MD+ TVD of Top and Bottom and
interval, size and number)
NA
25
SIZE
NA
TUBING RECORD
DEPTH SET (MD) PACKER SET (MD)
26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
DEPTH INTERVAL (MD) I AMOUNT & KIND OF MATERIAL USED
See attached operations summary
27
Date First Production
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Date of Test
Hours Tested
PRODUCTION FOR OIL-BBL
TEST PERIOD Ë
CALCULATED OIL-BBL
24-HOUR RATE Ë
GAS-MCF
WATER-BBL CHOKE SIZE
GAS-Oil RATIO
Flow Tubing
Press.
Casing Pressure
GAS-MCF
WATER-BBl Oil GRAVITY-API (corr)
28 CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
TO BE SENT UNDER SEPARATE COVER BY EXPLORATION GEOLOGY
RECEIVED
MAR 2 2 1995
A\aska au & Gas Cons. Commission
Anchorage
Form 10-407
Submit in duplicate
,,-..
--~-
30.
GEOLOOIC MARKERS
FORMATION TESTS
NAME
MEAS DEPTH
TRUE VERT. DEPll-I
Include interval tested, pressure data, all fluids recovered and gravity,
GOR, and time of each phase.
TO BE SENT BY EXPLORATION GEOLOGY
RECEIVED
MAR 2 2 1995
31. LIST OF ATTACHMENTS
A\aSKa Oil & Gas Con~. Commission
Anchorage
AS-BUILT SURVEY, P&A DIAGRAM AND DAILY DRILLING REPORTS
32. I hereby certify that the foregoing is true and correct to the best of my knowlege.
Signed
Jc¡L.
Title (}It/U...I/\/¿' £/\/M
DATE ..3/:<'I/'lÛ
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
ft. tn -.~ Af't"
~IIUN
~
I ~
550'
ICE PAD LIMITS ~
ALPINE #1
r- 222' ~
0-
33.5'
,
.
I
I CUTTING STORAGE
-:::::J r::::::=-=::J ~ 252'
;f
RECEIVED
Kt. V DA It:.
~y I~ ~
~IIQN
~.
~
~
~
550'
~
~
::z
~~
Scale 1" - 2 Ml1es
--'
ALPINE #1
LOCATED WITHIN PROTRACTED
SEC. 1, TWP. 11 N., RGE. 4 E.
UMIAT MERIDIAN
LAT. = 70· 19' 59.612"
LONG. = 151· DO' 37.253"
1,468' F.S.L, 2,248' F. W.L.
Y = 5,972,482.25
X = 375,455.03
GROUND ELEV.= 6'
TOP ICE PAD ELEV.= 7.S'
MAR 2 2 1995
NOTES
Alaska Oil & Gas Cons. Commission T. BASIS OF HORIZONTAL LOCA TlON AND ELEVA TlON
Anchoraga IS U.S. G.S. MONUMENTS CLEAR 4& BLACK.
2. COORDINA TFS SHOWN ARE ALASKA STA TE: PLANE
ZONE 4, N.A.D. 27.
3. DA TE: OF SURVE:Y: 1/13/95.
4. £l.£VA 770NS SHOWN ARE B.P.M.5.L
~.""....
~... ~ OF -,_
,..^ ~ ..,............« ....
. ~ -. '- ~.~.' ..... ""'~
;// *" ~
.Jy1.1 ..*,
.:9tø·'
" . ..
= .~. -. ,,10. -' - - .., ... i
I-.;g t--II L_n-- -- -." - --:- --:
il '¢ \ N J. ROOKUS ~: ð.
~z'\ _- .
"''' (I\. .... ~~8 35 .- .
Y.j -A ..... .." .
t...~~)'\·.....~ ~ "'5 ...,,~ 9'
'If. v ............. ~<:::>.
..~OF"E:SSIONþ..\.. \.~...
'..""..~
.
ARca Alaska, Inc. <>
Subsidiary of Atlantic Richfield Company
CADD FILE NO. I DRAWING NO:
LK601172 1/16/95
SURVEYOR'S CERT1F1CA TE
I H£R£BY CERTlFY THA T I AM PROPERL Y REGISTERED AND
UCENS£D TO PRAC77Œ LAND SURVFY1NG IN THE STA TE: OF
ALASKA AND THA T THIS PLA T REPRESENTS A SURVEY
DONE BY ME OR UNDER MY DIRECT SUPERVISION AND
THA T ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT
AS OF JAN 13, 1995.
~ LOUNSBURY
&. ASSOCIATES, INC.
:"ENGINBIRS PLANNBRS SURVEYORS
'q.
XXXX
ALPINE #1 EXPLORATORY WELL
CONDUCTOR 8( ICE PAD
AS-BUlL T
I SHEET·
CEA-MIXX-601D172 001 OF 1
M1
00
I REV: 0
.
8-1/2" HOLE
CMT PLUG #2
r~IM]Ê ARCTICSET III
[1-:73 ARCTICSET I
r~~~~1 CLASS G CMT CMT PLUG #1
.~'--':~:
TO 9940'
~~"~,~""~""""
~"""""""""
~"""""""""
~"""""""""
~"""""""""
~"""""""""
~"""""""""
~"""""""""
~"""""""""
-~"""""""""
~"""""""""
,"""""""""
I~"""""""""
~"""""""""
I""""""""'"
~"""""""""
I' ~'" ~"" ~""'" ~
Ii 20 BBL HI VISJ
Ii.. _ _ _ __ _ _ _ _ __ - --
I
I
I
I
I 10.2 LB/GAL
I MUD
I
I
,
I
I
I
R",'::~~:::"-~,,,~V::~~~
~"""""""""~
~"""""""""
t~~~~~~~~~~~~~~~~~~~
t~~~~~~~~~~~~~~~~~~~
~"""""""""~
~"""""""""
"""""""""
"""""""""
j"""""""""]
"""""""""
"""""""""
""""""""'"
""""""""ill'
"""""""""
"""""""""
l~~~~~~~~~~~"
TAGGED TOP OF CEMENT PLUG AT 4060'
K-3 INTERVAL 4630'-4650' MD (4042'-4056'TVD)
BOTTOM OF CMT PLUG 4700'
RECE\VEO
MAR 2 L 1995
AlasKa Oil & Gas Cons. Commission
Anchorage
TOP OF CEMENT PLUG 9539'
J-4 SANDS 9639'-9734' MD
BOTTOM OF CEMENT PLUG 9940'
FJ 2/26/95
I 20 BBL H I VIS I
~..- -. ---------....
I I
I I
I I
I I
I I
I I
I 10.2 LB/GAL I
I MUD I
I I
I I
:::::~'r . - - - :;.:-
r.... ::.1
:j;:. <.:~
I
. .
¡ ¡
¡ !
WEST SAK J¡j~l II
r::::}::: ~:{~:::::¡j
::;·:J¡f<"<' '" "" ,,<"<, '" """«" "" """" :f, :.)
.. ':.': """""""""""""""""" '.:.'.:.!
L-80, BTC ..:...... """"""""""""""""""~·I.
..' """""""""""""""""" ':.
765' RKB "L-'o-u:u."-~~~~~~~~~~~~~~~~~~~r~~''L~'L
~"""""""""
~"""""""""
~"""""""""
~"""""""""
,"""""""""
~"""""""""
~"""""""""
~"""""""""
~""""""""'v
~"""""""""
~"""""""""
'H..nHn....nHH.. BOTTOM OF CEMENT PLUG 2200'
3-3/8" 68 LB/FT,
SURFACE CSG AT
CMT PLUG #3
TAGGED TOP OF CEMENT PLUG AT
645'
6"
HOLE
0.2 LB/GAL
MUD
20"
CONDUCTOR AT
20' RKB
ALPINE #1A
PLUG BACK PRIOR TO SIDETRACK DIAGRAM
5000 PSI WELLHEAD EQUIPMENT
,---,
,-----
Date:03/20/95
Page: 1
~.
--
ARCO Alaska Inc.
DAILY DRILLING REPORT
--------------------------------------------------------------------------------
WELL:ALPlNE #lA RIG:POOL #6 WI: 56% SECURITY:?
WELLID: AX9329 AFE: *AX9329 TYPE:EXP AFE EST:$
AREA/CNTY:NORTH SLOPE BOROUGH STATE:AK API NUMBER:50-103-20211-01
FIELD: COLVILLE
SPUD: START COMP: FINAL :
--------------------------------------------------------------------------------
02/18/95 ( 1)
TD: 2 4 60' (24 60 )
SUPV:DCB
02/19/95 ( 2)
TD : 4 030' (1570)
SUPV:DCB
02/20/95 ( 3)
TD: 5315' (1285)
SUPV:DCB
02/21/95 ( 4)
TD : 6218' ( 903 )
SUPV:DCB
02/22/95 ( 5)
TD : 6972' ( 754)
SUPV: DRM
MW: 10.0 PV/YP: 19/14 APIWL: 6.2
DRILLING 8.5" HOLE
Drill hard cement f/1660'-1800'. No further hydrocarbon
indications. Good cement at shoe and below shoe. TOH for
BRA. Drilling 8.5" hole. Rotate t/1873', slide/rotate to
kick off as per plan to 2124'. Drilling directional 8.5"
hole to 2460'.
MW: 10.1 PV/YP: 19/22
DRILLING 8.5" HOLE
Drilling 8.5" hole f/2460'-4030'.
APIWL: 6. 0
MW: 10.0
DRILLING 8.5" HOLE
Drilling f/4030-5315'.
PV/YP: 12/10
APIWL: 5.8
MW: 10.0
PV/YP: 13/14
APIWL:
5.6
RIH W/BHA #3
Drilling f/5315-6218'. Unable to slide drill, ROP nil.
Frequent motor stall. Use of lubricants and soaps
ineffective. Good Rap w/rotary. CBU, pump dry job. POH
f/bit and BRA changes. Change out bit.
MW: 10.1 PV/YP: 12/14 APIWL: 5.4
DRILLING W/BIT #3
RIH to casing shoe at 1765' and fill pipe. Drill and survey
with bit #3 from 6218' to 6972'.
02/23/95 ( 6) MW: 10.0 PV/YP: 14/14 APIWL: 5.4
TD: 7568' ( 596) TRIP FOR NEW BIT AND MWD
SUPV:DRM Drill and survey with bit #3 f/6972 to 7568'.
. --- --- --- - -
02/24/95 ( 7) MW: 10.1 PV/YP: 11/15 APIWL: 5.6
TD: 7823' ( 255) DRILLING W/BIT #4
SUPV:DRM Finished POOH with bit #3. Test BOPE. RIH with bit #4.
Drilling and survey f/7568 to 7823. Severe bit balling.
02/25/95 ( 8)
TD: 8185' ( 362)
SUPV:DRM
PV/YP: 11/15
R~f'VtÐ
MW: 10.0
RIH W/ RR BIT #2
Drilled and logged (LWD) 8.5" hole from
Tripped for new bit and BHA.
7823' to 8185'.
MAR 2 2 1995
A\aska OU & Gas Cons. Commission
Anchora(je
Date:03/20/95
Page: 2
02/26/95 ( 9)
TD : 9550 I (13 65 )
SUPV:DRM
02/27/95 ( 10)
TD: 99401 ( 390)
SUPV: DRM
02/28/95 ( 11)
TD: 9940 1 ( 0 )
SUPV:DRM
03/01/95 ( 12)
TD: 1 7 65 1 ( 0 )
SUPV:DCB
.-"-.
.--
ARCO Alaska Inc.
DAILY DRILLING REPORT
MW: 10.1 PV/YP: 13/15
DRILLING WITH RR BIT #2
Drilled and logged (LWD) 8.5" hole from 8185'
_ _ __ ...... J>.. _.- _ _ _ ___... ...... _ _.. _ _ -
APIWL: 4.8
to 9550' .
APIWL: 4.6
MW: 10.1 PV/YP: 14/13
RIH W/OEDP TO P&A WELL.
Drilled and logged (LWD) 8.5" hole from 9550' to 9940'.
Made MAD pass from 9524' to 9940'.
POOH. RIH with open ended drill pipe.
~ - - - - -.. --- - ...... - - - - - -
MW: 10.2 PV/YP: 14/15 APIWL: 6.4
WOC. CLEAN PITS; REPAIR BRAKES
RIH. Set P&A cement plugs from 9940' to 9140' and from
47001 to 4100'. POOH.
MW: 10.3 PV/YP: 12/13 APIWL: 6.4
P/U 12 1/4" BRA
RIH with bit. Tagged cement plug at 4060'. POOH. RIB.
Set P&A/Kickoff cement plug from
22001 to 1665'. POOH. Tested BOP.
End of WellSummary for Well:AX9329
RECE\VEO
MAR 22 1995
~\aska OH & Gas Cons. Commissio.n
Anchora'"JJ
,,-
~ACO Alaska, Inc.
AFC No. I~No. IDaW
AX9329 1 2/18/95
Well C/i:<'~. ...... .,~.. Depi1 (MDlI YO)
ALPINE #1-A-"- ~ 2460
Ca'ltrac:tor Daily Coat
POOL RIG #6 $107420
Operation at 0600 LastCeg
Drilling 8 1/2" hole 13 3/811 @ 1,765'
IIJDDATA BIT MTA
Mud type LSND MBT 9.0 ppb Bit No. '1
Weight 10.0 ppg pH 10.6 -size 8.5
V" ISCOSity 62 see Pm 0.65 Make HTC
PVfVP 19/14 PI 0.50 Type AT J-POS
Gels 3/11 Mf 1.10 Serial No. V73BH
APIWL 6.2 cc Chlorides 700 ppm DepIh 2460
HTHP 200 psi CC Oil % FooIage 800
HTHP SDO psi OWR ADT/AST 6.0
Sorlds 10.0 % ES APM 60f202
Sand % LGS 80.0 Iblbbl wœ 5/10
Hole vol. 277 bbl Pit Vol 437 bbl Jets.TFA 13-1~14
Daily Mud 5500 Total Mud 5500 Bit Colt S6664
Rig Accept Dun
0400 hrs 1/28/95 Grade
SUN. No. 2 3 4 5 6
Deplh (MD) 1,971 2067 2158 2251 2346
Angle 4.4 7.7 10.8 13.9 17.1
Direction 328.6 340.8 341.0 337.0 334.6
T.V.D. 1,971 2066 2155 2247 2338
Vert Sec. -12.9 -3.0 11.2 30.8 55.6
North 6.3 2.9 16.7 35.3 ~8.3
West 14.1 -10 -5.3 2.0 12.3
DogLeg 6.10 3.68 3.32 3.46 3.48
TIME Code
0600-1200 6.0 2
1200-1230 0.5 5
1230-1330 1.0 6
1 330-1600 2.5 6
1600-2130 5.5 2
2130-2200 0.5 5
2200-2230 0.5 6
2230-01 00 2.5 21
0100-0130 0.5 6
0130-0600 4.5 2
.'- / \/
,-----. / \ -, ,-
Daily Drilling Report
1~1i1~ lõé~
PIWIOUS Depch (MO) rrogr-
Cum eo. 1660 (PBL eo. ~o 0.. 800
$107420
"Nul CIg "Shoe T_
N/A 14.6
I&JDlOG MTA DAl1.tIGDATA
)epIh 2313 o.pt1 2,310 Rot Wl 105
~ud Wl 10 P.u. Wl 110 S.O.Wl 105
FDnnltion CL/Sl--.Avg er.g 5 Max DrIIg 10
Jkg 7 Trq 8m Trq Surf 75
"'... ..' ..,...,,.
Com va Pump No. 2 3
T~V- 43 LiwIr Siz. 5.5x12 5.5x12
Max BGG 29 SPM 55 55
DC EJponent GPM 194 194
Shale deneity Pr_re 1,600
'"!&........... t'\I.... UI"^
Ell pen ~ 9.1 SlOW PS 30 45
ROPIShaIe 133 SlOW PP 100 200
ROPISMd
Rig ReIeaM
Operations From 0600 . 0600
Drill hard cement fl 1660'-18001. (12 1/411) No further hydrocarbon indications.
Good cement at shoe and below shoe.
CBU
TOH for BHA.
P/U 8 1/2"BHA. Load MWD. TIH.
Drilling 8 1/2" hole. Rotate tJ 1873', slide/ rotate to kick off as per plan to 2124'.
CBU
POH to shoe.
Clean pits, displace mud in hole! pits with LSND mud 10.0 ppg.
TIH to 2124'.
Drilling directional 8 1/2" hole to 24601. Ahead on angle. Difficulty with new
mud and drilled clays blinding shakers. Sizing shaker screens on connections. Runnin~
reduced flow rates.
'-".
""
ARca Alaska, Inc.
Daily Drilling Report
t:!NA uescl'lp!lon
8 1/2" Bit, Mach 1c AKO 1.20 motor, NM STAB, XO, MWD, XO FLT SUB, 6-61/2"DC, XO, 4 HWDP,
DNT JARS, 16 HWDP. OAL 896.661
t:!HANO.:
Un~Ualallop 101SOGOm)
1
00
We9rt
Gr8de
Connection CIua
LengfI
13ST
5
5
19.5#
19.5#
G
8135
41/21F prem 1217.82
41/21F prem
Ua1e Last Inspected
1/27/95
Hours On Jars
Daily Jar ## 1621-0042 DNT 8.0
ÑÕent? (Y/N) Name
I:mpIOyer
'"¡.¡p. ......7 (Y IN)
Injection
6 BPM
950
Fuel & W.".r
'1-ueI On LcaIIOnS (gala) Fuel Uaed (gals)
24752 -1980(CORR)
'T:ueI Received (gals) Fuel Source
9500 CPF-1
lIn yy awr un LOCCKIOf1 lDOIS/"'u n yy a14lr U8eO lDOIS
In¡eclion Welt
2M-23
Rate:
Pressure
Volume
777
Type Fluid:
Mud
bÞIS
15
Diesel
H20
684 376
ÌJn Water H8CeIV4ICIIDDIs) ÌJn wa"'r ~uroe
bÞIS
300
Lake 93-12
f-U\1I018 w...ef un LOC. IDOISf't-OIaDI8 waler usea lDOIS
Dally Volum.
Cumulaw. VoIum.
176 4 (CORR)
'11~ w... RcYd (bòIa) "P0IAbIe We"'r Sourc.
80 Lake 93-12
792
bbls 6593 bbls
Cunngs Data
Weather Data
ì emperatur.
PeI'IOIYIeI
Safety I BOP Dale
"la.I BOP tMVUiY function laaI BOP Drill
Dally
6yds
-32
ARCO 1 2/16/94 2/16/95
LasI~:s Unll Lass "ß unlr
CONTRACTOR 35 2/9/95
"\..ass :safety Mtg 1.ass ::;pm Unll
SERVICE 11 2/17/95 2/9/95
:'pdI (Y IN) ""Olum. (gals)
OTHER NO
'"I ype Spall 1Ieport Filed?
TOTAL 47
Operations From 0600 . 0600
L.lnIulaWe
Vvnd speed
::itorage :srte
"u1,lIlactor
8kts
-70 of
714 yds
Alpine #1 Location
'Well Name
lJale
Alpine #1
2/18/95
Signed
DC Bumgarner
Time Hours Code
Road maint Water Used f/ Lake #93-12 = 0 bbl
Road Maint Water Used f/ Lake #91/16 = 900 bbl
Road Maint Water Used f/ Lake #93/32 = 450 bbl
Cum=4850 bbl
Cum=8830 bbl
Cum=40750 bbl
Daily grey water disposed at CPF-1 =125 bbls
Total grey water disposed at CPF-1 = 2353 bbls
Daily cuttings to CC2-A ball mill = 0 yds
Total cuttings to CC2-A ball mill = 284 yds
TOTAL
Page 2
ARCO ALASKA INC. 0 ALASKA DRILLING COST ESTIMATE
Prepared By: MCKELVEY/BUMGARNER COLVILLE POOL #6
WELL: ALPINE '1 A Date: 2/12/95 WEEK 4 AFE # AX9329
EXP CAP ~ DESCRIPTION Base Previous Total Cost
SUB SUB ELE TANGIBLE COSTS: Cost/day Total 2/12/95 2/13195 2/14/95 2/15/95 2/16195 2/17/95 2/18/95 To Date
210 500 XXX TUBULAR GOODS: 20" condo
210 500 595 9-5/8" aD, 0' - XXXX'
210 500 570 7" 00, a· 10709'
210 500 513 13318" 00
210 500 504 CASINGHEAD & CHRISTMAS TREE
210 500 506 TUBING ACCESSORIES
210 500 507 ARTIFICIAL LIFT ACCESSORIES
210 500 508 WELL PROTECTIVE STRUCTURE
AUTOMATIC TANGIBLE TOTAL
\, JeP CAP DESCRIPTION Base Previous Total Cost
SUB SUB ELE INTANGIBLE COSTS: Cost/day Total 2/12/95 2/13/95 2/14/95 2/1&95 2/16195 2/17/95 2/18/95 To Date
210 600 000 UNCLASSSIFIED 125 125
013 600 014 TECHNICAL LABOR 1,800 1,800
013 600 015 TECHNICAL EXPENSES 50 50
020 600 025 NORTH SLOPE TRASH HAULING 300 300
210 600 053 BOAT OPERATIONS
210 600 078 MINOR SUPPLIES 50 50
210 600 242 DIESEL FUEL @ 0.90/GAL ;' :,; ,.' :,"~' ',;.:; 10,493 10,493
210 600 246 FRESH WATER & DRAYAGE 2,200 2,200
210 600 250 SAFETY, SECURITY, FIREFIGHTING
210 600 502 PEAK CONTRACT SUPRV & LABOR 1,080 1,080
210 600 503 TESTING TUBULARSIINSPECTION
210 600 509 TRUCKING TUBULARS 400 400
210 600 512 CASING ACCESSORIES
210 600 514 SITE PREP., MAINT., CLEAN-UP 150 150
210 600 515 PERMITS, INSURANCE, DAMAGES 20 20
210 600 517 MOVING EXPENSE
210 600 522 CAMP HOUSEKEEPING
210 600 528 AIR FREIGHT & AIR TRANSPORT 1,200 1,200
( ,210 600 529 REMOTE ON-SITE MEALS
210 600 531 ENVIRONMENTAL $129yd-CC2A 3,500 3,500
210 600 533 DRILLING RIG DA YWORK 25,131 25,131
210 600 534 MOBILIZATION/RIG MOD.lDEMOB.
210 600 536 ROADS, AIRSTRIPS 5,833 5,833
210 600 542 COMPLETION UNIT DAYWORK
210 600 543 DRILL STRING RENTAL 230 230
210 600 547 WELL CONTROL EQUIPMENT/SVC
210 600 548 DRILL BITS, REAMERS AND TOOLS 6,764 6,764
210 600 551 DRILLING MUD MATL'S & DRAYAGE 11,300 11,300
210 600 552 DRILLING MUD EQUIPMENT 250 250
210 600 553 COMPLETION FLUIDS
PAGE 1 OF 2
ARCO ALASKA INC. 0
WELL: ALPINE .1 A
EXP CAP
SUB SUB
210 600
210 600
210 600
210 600
210 600
210 600
210 600
~10 600
10 600
¿10 600
210 600
210 600
210 600
210 600
210
210
210
210
210
012
290
290
290
AUTOMATIC
l
AUTOMATIC
AUTOMATIC
600
600
600
600
600
600
600
600
600
DESCRIPTION
ElE INTANGIBLE COSTS:
557 OPEN HOLE SURVEYS
559 WIRELlNE WORK
560 FORMATION MONITORING
561 CASED-HOLE SURVEYs/PERF FEES
563 SURFACE WELL TEST EQUIPMENT
568 CORING COSTS
572 DRILL STEM TESTS
577 ACIDIZE ,FRACTURE,GRAVEL PACK
578 DIVERS
580 FISHING TOOL RENTAL & DRAYAGE
581 DIRECTIONAL DRILLING TOOL
582 TELECOMMUNICATIONS
588 MATERIAL LOSSES
XXX CEMENT AND RUNNING FEES FOR
CASING AND TUBING
695 9-518- 00 WI XXX SACKS
670 roo WIXXX SACKS
650 20- CONDo
613 13318- aD WI 1006 SACKS
613 CEMENT FOR SQUEEZES OR PLUGS
012 AAI MAINTENANCE LABOR
157 *RATE ALLOCATIONS
158 *LABOR BASE ALLOCATIONS
159 *USAGE ALLOCATIONS
TOTAL INTANGIBLE COST
DAIL Y FIXED COSTS
TOT AL DAILY COST
TOTAL DRILLING COST
Around the comer rig move
Rig Accepted @
Rig Released @ XXXX hrs on XXlXXl94
Prepared By: MCKELVEYIBUMGARNER
Date: 2/12/95 WEEK 4
Base Previous
Cost/day Total 2/12/95 2/13/95
PAGE 2 OF 2
2/14195
2/15/95
ALASKA DRILLING COST ESTIMATE
COLVILLE POOL 16
AFE # AX9329
2/16195
2/17/95
Total Cost
To Date
5,700
2/18/95
5,700
1,800
1,800
14,294
1,000
14,294
1,000
8,250 8,250
500 500
5,000 5,000
107,420 107,420
107,420 107,420
107,420 107,420
107,4201 107,420
---,
ARca Alaska, Inc.
AFC No.
AX9329 I~l No. 2
c:~ 'ÄLPI NE #1 A·'
-- ? --~ .
POOLRIG #6
DaW
2/19/95
Dep1h (MOIl VI)
4030
Dally Cost
$105817
LastCBg
133/8" @ 1,765'
BIT MTA
Well
Ccnvac:tor
Operallon at 0600
Drilling 8 1/2" hole
.....0 DATA
TIME
0600-2300
2300-2400
0000-01 30
0130-0200
0200-0230
0230-0300
0300-0600
-""
Daily Drilling Report
1~6~
Jprogr-
Ea1. eo. 0 Dele 1570
revs 2i2Spuc!¡\:n
PIWVIOUS Depeh (MD)
2460'
'turn Cot(
$213237
"Nut c.g
N/A
~T_
14.6
DRUINGOATA
3,940 Rot Wl 120
105 S.O.Wt. 105
5 Ma Drag 20
100 T~ Surf 100
.... . .-.....
2 3
5.Sx12 5.5x12
65 65
229 229
1.11 GPM
Pr.-¡re 2,100
~\;.....f""UW"'~I"
30
200
45
400
Mud 1ype LSND MBT 21.0 ppb BilNo. #1 Depth
Weight 10.1 ppg pH 10.2 Siz. 8.5 Mud Wt.
VISCOSity 45 see Pm 0.0 Make HTC FonnIticn
PVlYP 19/ 22 Pf 0.40 Type AT J.P05 :Ikg
.
Gels 5/19 Mf 0.90 Serial No. V73BH Com g..
APIWL 6.0 CC Chlorides 500 ppm Depf'I 4030 T~V-
HTHP 200 psi CC Oil % Footag. 2370 Mu BGG
HTHP 500 psi OWR ADTlAST 20 DC Exponent
Solids 11.0 % ES RPM 601202 Shale density
Sand tr % LGS 90.0 Iblbbl woe 10/18 Ell pen pMW
Hole yoL 297 bbl Pit VoL 700 bbl Jets.TFA 13-14-14 ROP/Shele
Daily Mud 23896 Total Mud $24396 Bit Cost $6664 ROPISand
Rig Accept DuR Rig Re....
0400 hrs 1/28/95 Grad.
.J 9 15 -..I
SUN. No. 12 18 21
Deplh (MD) 2,626 2908 3188 3469 3876
Angle 23.4 29.0 38.4 46.6 49.9
Direction 329.3 323.7 326.0 327.1 327.0
T.V.D. 2,600 2854 3087 3294 3559
Vert Sec. 153.7 277.0 432.0 621.0 930.3
Nor1h 143.1 245.1 372.1 529.4 788.8
Wes1 61.7 131.2 220.1 324.9 493.4
DogLeg 1.95 2.52 3.45 3.08 0.35
YJDlOGMTA
3874 DepfI
10 P.U. Wl
MSICl1S-...Ayg Drag
6 Trq e.n
Pump No.
345 Lner Siz.
SPM
9.1 SLOW PS
136 SLOW PP
175
17.0
1.0
1.5
0.5
0.5
0.5
3.0
Code Operations From 0600 . 0600
2 Drilling 8 1/2" hole f/2460-37801. Build angle as per directional plan.
S CBU f/ wiper trip.
6 Short trip 21 stds to shoe. Max overpull20k. RIH t/37401.
5 Break circulation, jets plugged off, work pipe to clear.
2 Wash to bottom, drilling f/ 3780-38001.
5 Bottoms up, shakers blinding off. Circulate till clean.
2 Drilling f/ 3800-40301.
R(G[\V£D
APR 21 \995
~\aska Oil & Gas Cons. commlsstÐn
'-\. l\I1ChOre'l
)
"
')
ARca Alaska, Inc.
Daily Drilling Report
tlNA uescnµtlOl\
8 1/2" Bit, Mach 1c AKO 1.20 motor, NM STAB, XO, MWD, XO FLT SUB, 6-61/2"DC, XO, 4 HWDP,
DNT JARS, 16 HWDP. OAL 896.661
'aHA No.:
1
OD
W.is;It
Grade
Unl~ Uata (lOP 10 ISOttom)
CoIYIaction Cia.
lAngf1
30xx
5
5
19.5#
19.5#
G 41/21F prem 2873.15
8135 41/21F prem
'\Jate La" Inspaded
1127/95
Hours On Jars
Daily Jar # 1621-0042 DNT 24.0
~õ"I'/ (Y/N) INam.
~y.r
'Hpt. "II..? (Y7N)
Injection
Injection Well:
2M-23
Rat.:
Pr..sure
Fuel & Wa.r
~ueI On Locations (gala) Fuel Used (gala)
31422(corr) 4810
~ual Raeeivad (gala) Fuel Source
o CPF-1
Lin YVa18r vn L.OCCIon (DDlSrun YVa18r usea (IJOIS)
6 BPM
Volum.
1173
ÒÞIs
950
Type Fluid:
Mud
Diesel
H20
730 1079
1Jn wa.r Hac:8IVacI (ÞÞIS) "I.Jn wa.t ::iòuret
1179 Lake 93-12
~",ao.. WI"er vn LOC. (DOtSf"t-ouw.. water usea (CDIS)
40
"'bbis
Daily Volume
Cumulawe Volume
176 84
'tIotlble W.er Rcvd (tibia) "Potable W..r Soun:.
75 Lake 93-12
1213
bbls 7806 bbls
Cuttings Data
W..1her Data
ì emperature
Parsomal
Safety I BOP Data
La" BOP tastIUiv function Last BOP Dnll
'Daily
9 yds
-22
ARCO 1 2/16/94 2/16/95
last~:; Unll i.aat ..n Unlr
CONTRACTOR 35 2/9/95
L.alll :;a'ety Mtg i.... :;Pili Unll
SERVICE 11 2/17/95 2/9/95
""sptll (Y IN) "olum. lIIals)
OTHER NO
ìype Sptll ~lpOrt FIled?
TOTAL 47
Operations From 0600 - 0600
l..lmulatrve
Vvnd speed
723 yds
8kts
:s'orage :sae
"t';hlll 'actor
Alpine #1 Location
-45 of
\veil Name
'\.Jate
Alpine #1
2/19/95
Signed
DC Bumgarner
Time Hours Code
Road maint Water Used f/ Lake #93-12 = 0 bbl
Road Maint Water Used f/ Lake #91/16 = 1350 bbl
Road Maint Water Used f/ Lake #93/32 = 00 bbl
Cum=4850 bbl
Cum=10180 bbl
Cum=40750 bbl
Daily grey water disposed at CPF-1 =0 bbls
Total grey water disposed at CPF-1 = 2348 bbls
Daily cuttings to CC2-A ball mill = 0 yds
Total cuttings to CC2-A ball mill = 284 yds
TOTAL
Page 2
ARca Alaska, Inc.
AFC No. AX9329 1Apt. No. 3
Will '.'''''_'~'-'",.,.....
~1~·';Ä1.PiNE#1A f
Caltrac:tor
POOL RIG #6
Operation at 0600
Drilling 8 1/2" hole
MUD DATA
Mud type LSND
Weight 10.0+ ppg
VISCOsity 39 see
PVNP 12/10
Ge. 2/5
APIWL 5.8 cc
HTHP 200 p$Ï CC
HTHP soo psi
Solids 10.0 %
Sand tr %
Hole vol. 467 bbl
Daily Mud $3270
Rig Accept
MBT
pH
Pm
PI
Mf
Chloride.
Oil
OWR
ES
LGS
PilVol.
Total Mud $27666
0400 hrs ,1/28/95
Surv. No. ~ 21 " 32 ~SS
Deplh (MD) 3,876 4372 4116
Angle 49.1 50.2 41.1
Direction 327.0 321.2 328.0
T.V.D. 3,559 3878 4161.6
Vert Sec. 130.3 1310.5 1650.8
North 788.8 1110.3 1391.1
WetSl 493.4 616.2 875.2
Dog Leg 0.35 0.54 0.25
TIME Code
0600-1730 11.5 2
1730-1800 0.5 5
1800-2000 2.0 6
2000-2100 1.0 6
21 00-2300 2.0 6
2300-0600 7.0 2
)
IDa~
')
Daily Drilling Report
ID68
Jprogr-
Eat. Coat oDa~ 1285
2120/95
Depth (M[).IP/D)
5315
"Daily Coal
$103978
"1._ Cag
13 3/8" @ 1,7651
IDaY8 3i3Spudfcal
PnÞViou. DepIh (MD)
4030'
'turn Coat
$317215
"Next Cag
N/A
Shoe T...
BIT Do\TA WOLOO Do\TA
14.6
28.0 ppb Bit No. .1 1#2
9.7 Size 8.5 8.5
0.0 Make HTC HYC
0.25 Type AT J.PQ5 DS40HF+
0.60 Sarill No. V73BH 16096
500 ppm Depth 4874 5315
% Footage 3074 1285
ADT/AST 28.7 4.7
RPM 601202 601300
75.0 Iblbbl
706 bbl
~
37
5120
41.2
327A
4351
1882.2
1516.1
918.0
0.40
woe 10/18 417
Jew.TFA 13-14-14 11·11·12·12
Bit Cost $6664 $20750
Dun 2 2 no .
Grade E I NO HR
Depth 5225 DepfI
MudWl 10 P.U. Wt.
F~ion MSJCUSf-..Avg Drag
*" 7 Trq 81m
Com V" Pump No.
T"" V. 23 Li'Ier Size
Max BOG SPM
DC Exponent
1.4 GPM
Presaur. 2,300
~\.hr.. ""'W" UI\ 1"
She. denaity
Eat. pore prøa
ROP/Sha"
9.2 SLOW PS
110 SLOW PP
ROPlSand
Rig Re....
220
ORUNGDATA
5,242 Rot Wl 132
140 S.O.Wt. 120
10 Max Drag 20
150 Trq Surf 150
". . ",",I"
2 3
5.5x12 5.5x12
65 65
229 229
30
200
45
400
Operations From 0600 . 0600
Drilling f/4030-48741. ADT 8.7
CBU, pump dry job.
POH f/ bit #2. Dump LWD/MWD tool.
Change bit, change motor degree V 10.
TIH, no tight spots or fill.
Drilling f/4874-53151. ADT 4.7. Slide 5225.52421, took 1.5 hrs. Wall hanging.
,)
')
ARCO Alaska, Inc.
Daily Drilling Report
1:HA uescn~mon
8 1/2" Bit, Mach 1c AKO 1.20 motor, NM STAB, XO, MWD, XO FL T SUB, 6-6 1/2"DC, XO, 4 HWDP,
DNT JARS, 16 HWDP. OAL 893.691
1
OD
We~t
Grme
un~ Uala (lOP 10 tsollom)
Conn«:tion CIa.
Lengtl
I:SHANO.:
'Dale Last Inspected
45
1
5
5
19.5#
19.5#
G 41/21F prem 4220.24
S135 41/21F prem 94.74
1/27/95
Hours On Jars
Daily Jar # 1621-0042 DNT 36
~õnl7 (YIN) I Name
employer
"Hpt. "'IeS? (Y/N)
Injectioo
In8C1ion Well:
2M-23
Rate:
Pr_re
Fuel & Water
~uel On LOCIItia'l. (gale) FuelUMd (gals)
36122 4300
~uel R8C8IY«I (gals) ~uel Source
9000 CPF-1
Lm water vn I.OC...IOO \DOISrun water useo IDOlS)
6 BPM
"Volume
430
èÞIa
45
bbI6
192
950
"ype Fluid:
Mud
Diesel
H20
835 865
UI1 Water HeC8IYed (DÞIs) ÌJI1 Water ~urC8
970
Lake 93-12
1-''''''18 water vn I.OC. 10000"""OUIDI8 water US8CI IODIS)
Daily Volume
Cumulative Volume
160 96
"'fIotable Wa1w Rcvd (bbIs) "'fIolable Water Sourt:e
80 Lake 93-12
667
bbls 8473 bbls
Cuttngs Data
Weather Data
ì emperature
Pel'lOmel
Safety I BOP Data
l.ast BOP t15t1uiY function Last BOP Drill
Daily
9 yds
-38
ARCO 1 2/16/94 2/20/95
L.ael H:o:::; Urlll i.a. t-lnllJnlr
CONTRACTOR 35 2/9/95
L.. :sale'Y Mtg L.a. ::;Pili urm
SERVICE 14 2/20/95 2/19/95
~P'" (TIN) "\rolume ¡g.IS)
OTHER NO
ì ype Spill ~eport Filed?
TOTAL 50
Operations From 0600 - 0600
"umulalrve
Wind speed
:storage ::;118
l.nllllador
8kts
-70 OF
730 yds
Alpine #1 Location
\v 911 N8, ,,41
'\"a18
Alpine #1
2/20/95
Signed
DC Bumgarner
Time Hours Code
Road maint Water Used f/ Lake #93-12 = 0 bbl
Road Maint Water Used f/ Lake #91/16 = 450 bbl
Road Maint Water Used f/ Lake #93/32 = 00 bbl
Cum=4850 bbl
Cum=10630 bbl
Cum=40750 bbl
Daily grey water disposed at CPF-1 =120 bbls
Total grey water disposed at CPF-1 = 2468 bbls
Daily cuttings to CC2-A ball mill = 0 yds
Total cuttings to CC2-A ball mill = 284 yds
TOTAL
Page 2
ARCO Alaska, Inc.
AFC No. I Apt No. Daw
AX..9329 4
'Well
ALPINE #1A \
.'
Contractor
POOL RIG #6
Operallon III 0600
RIH WI BHA #3
WOODAT"
Mud type LSND MBT 30.0 ppb
Weight 10.0+ ppg pH 9.2
VISCOSity 42 see Pm 0.0
PVNP 13/14 Pf 0.25
Gels 3fT Mf 0.75
APIWL 5.6 CC Chlorides 500 ppm
HTHP 200 psi 20.6 CC Oil %
HTHP 500 psi OWR
Solid. 11.0 % ES
Sand tr % LGS 75.0 Iblbbl
Hole vol. 583 bbl Pit Vol. 443 bbl
Daily Mud $3287 Total Mud $30953
Rig Accept
0400 hrs 1/28/95
Surv, No. 37 39 41 43 45
Dep1h (MD) 5120 5410 5611 5170 6156.5
Angle 49.2 51A 50.2 51.1 50A
Direction 327A 327.3 326.0 325.' 327A
T.V,D, 4359 4S46 4723 4891 5016
Vert Sac. 1882.2 2104.7 2322.1 2540.0 2684.0
North 1596.1 1781A 1163.3 2145.9 22~.8
WflISt 198.0 1121.0 1240.2 1359.1 1438.9
DogLeg 0.40 1.44 0.64 1.13 2.11
TIME Code
0600-0030 18.5 2
0030-0130 1.0 5
0130-0330 1.0 6
0330-0600 2.5 6
")
"
2/21/95
Depth (MOIl \/D)
6218
"Daily eo.t
$94930
"Lastce;
13 3/811 @ 1,7651
BIT 1».1"
I Days lIOCe SpudIEsl
4/3.5
p..mu. Depth (MD)
5315 -
Cum Coat
$412145
"Nut CAg
N/A
Bit No. #3
Size 8.5
Make HTC
Type AT J-P05
Serial No. V81 BH
DepIh
Footage
ACT/AST
RPM
woe
Jets.TFA 13-13-13
Bit Cost
$6664
##2 Depch
8.5 IMud Wl
HYC Fonnation
DS40HF+ :!kg
16096 Com gas
6218 T~g_
2188 Max BGG
15.58 DC &ponent
60/300 Shale d.,tIity
417 Ell pore PAl.
11-11-12-12 ROPlShale
$20750 ROPlSand
2 2 NO A Rig Release
X I NO BHA
')
Daily Drilling Report
lõ6~
Jprogr.. 903
Ell Coat 0 Caw
~T_
14.6
WDLOO 1».1"
6218Dapth
10 P.U. Wt.
MSICLJS~vg Dreg
6 Trq Btm
Pump No.
23 Ln. Size
SPM
0.93 GPM
DAlLlNG DAT"
5,242 Rot Wt. 132
140 S.O.Wl 120
10 Max Drag 20
150 Trq Surl 150
~ '" .. """'"
2 3
5.5x12 5.5x12
65 65
229 229
P_re 2,300
~"'.. t"U,..LJIIII,I^
9.2 SLOW PS
113 SLOWPP
150
30
200
45
400
Dull
Grade
Operations From 0600 . 0600
Drilling f/5315-6218'. ADT 11.0 Unable to slide drill, ROP nil. Frequent motor stall.
Use of lubricants and soaps ineffective. Good ROP wI rotary.
CBU, pump dry job.
POH fl bit and BHA changes. Tight spot @ 49881, pulled 50k over.
Attempt to D/L MWD, no success. Ground fault in unit. Change out motor as a
precaution due to no. of stalls. PIU pony DC. XO bit. DS 40 5% wear.
")
)
Daily Drilli.ng Report
ARca Alaska, Inc.
"M1\ u&scnpuon
8 1/2" Bit, Mach 1c AKO 1.00 motor, NMLDC, NM STAB, XC, MWD, XO FL T SUB, 6-6 1/2I1DC, XC, 4 HWDP,
DNT JARS, 16 HWDP. OAL 903.20'
tsHA No.:
unl~ 011I. (1op 10 tIOlIom)
3 (carr)
00
Wei;lt
Grade
Connec:tion Clue
lengtI
uata Lalit Inspec:tec:l
45
11
5
5
19.5#
19.5#
G 41/21F prem 4220.24
8135 41/21F prem 1033.91
1/27/95
Houl'a On Jara
Daily Jar II 1621-0042 DNT 49
ÑÕenl7 (Y/N) NamA
employer
"Hpt. .......7 (Y IN)
In&dla1
6 BPM
Voluma
429
950
Fuel & Water
~uel On Location. (gala) Fuel IJHc (gala)
31276 4876
~uel Rec8IVed (gals) Fuel Source
CPF-1
lIn ¥vaUlr \Jr Locallon \DOI$,-un ¥vaUlr U&4IQ \DOI$)
)n8Qion Wall:
2M-23
Rate:
Pr_sura
ÞbIs
Type Fluid:
Mud
Diesel
H20
900 755
'\In ¥Vater ~ec:lIÞÞIa) "Un ¥Vater ~uròa
820 Lake 93-12
¡-........ w...... vn LOC. 1~""'OUlO" welar U5eQ IIDS
70
ÒbIs
Daily Volume
CumulatIVe Volume
174 66
t-Clteble w.. Rcvd (bbIs) 'fIotable Water Source
80 Lake 93-12
499
bbls 8972 bbls
Cuttings Data
Waalhar Data
I emparatura
Pe~1
Safety I BOP 011I.
lut BOP t_tlUiv function Last BOP DriU
Daily
5yds
-40
ARCO
1
35
14
2/16/94 2/20/95
"'la8l1'U::; una "Last ...... un,r
2/20/95
"'last ::¡alety MI¡ "Last ::;Pili una
2/20/95 2/19/95
"'IspllIIYIN) '\tolume (gals)
NO
"YI» SpiN "Repon Flied?
'L.wnUIaIIVA
'"W II'KI speed
:Slorage :srte
'\;nllllactor
6kts CONTRACTOR
-55 OF SERVICE
735 yds
Alpine #1 Location
\veil Name
'\)a16
Alpine #1
2/21/95
OTHER
Stgned
DC Bumgarner TOT AL
Time Hours Code
50
Operations From 0600 . 0600
Road Maint Water Used f/ Lake #91-23 = 2100 bbl Cum= 2100 bbl
Road maint Water Used f/ Lake #93-12 = 1350 bbl Cum=6200 bbl
Road Maint Water Used f/ Lake #91/16 = 0 bbl Cum=10630 bbl
Road Maint Water Used f/ Lake #93/32 = 300 bbl Cum=41 050 bbl
Daily grey water disposed at CPF-1 =0 bbls
Total grey water disposed at CPF-1 = 2468 bbls
Daily cuttings to CC2-A ball mill = 0 yds
Total cuttings to CC2-A ball mill = 284 yds
TOTAL
Page 2
)
')
Daily Drilli~g Report
IÕÅ~
Jprogr- 860
Eat. eo.! 0 Da.
ARca Alaska, Inc.
I Days 8II1Ce Spucl/t:1l
5n.5
PreVlOUa Depch (MD)
6112
Cum eo.
$499,609
"Next c.g
N/A
AFC No. I P9L No. IDa~
AX9329 5
'^' ell
". 'AlPïNE #1 A .
Contractor
POOL RIG #6
OperatlOl1 at 0600
Drilling w/ bit #3
....D DATA
Mud type LSND MBT 33.0 ppb
Weight 10.1+ ppg pH 8.8
VlSCOaity 39 see Pm 0.0
PVNP 12/14 Pf 0.50
Gels 4/8 Mf 0.65
APIWL 5.4 CC Chlorides 500 ppm
HTHP 200 psi CC Oil %
HTHP 500 psi OWR
Solids 12.0 % ES
Sand tr % LGS 95.0 Iblbbl
Hole vol. 633 bbl Ph Vol. 443 bbl
Daily Mud $3,304 Total Mud $33,997
Rig Accept
0400 hrs 1/28/95
SUN. No. 46 47 41 49 50
Depth (MD) 6252 6377 6532 6709 6866
Angle 5050.5 51.3 52.1 52.9 51.9
Direction 325.6 325.3 327.7 329.5 328.9
T.V.D. 5077 .27 5156.02 5252 5359.61 5455.64
Vert Sec. 2758.9 2854.8 2876.8 3116.7 3241.0
North 2327.5 2407 A 2508.8 2628.5 2735.5
West -1479.7 -1534.6 -1601.8 -1674.8 -1731.6
pogLeg 1.37 0.07 1.28 0.09 0.72
2122195
Depth (MDt I VD)
6,972
Dally Cost
$87,464
IAatCeg
13 3/811 @ 1,7651
Shoe T_
14.6
DAU.INGDATA
6,943 Rot Wt. 150
165 S.O.Wt. 135
15 Mu O..g 20
150 Trq Surf 350
~'"" r 1.....,"
2 3
5.5x12 5.5x12
65 65
229 229
BIT I».TA IoIJDLOG I».TA
Oeplh 6912 Oepf\
Mud Wt. 10.2+ P.U. Wt.
Bit No. 13
Size 8.5
Make HTC
Type AT J·POS
Serial No. V81BH
Depth 6,972
FOOIage 860
1.OT/AST 16
RPM 771300
Fonn8ticn MSICL/S~vg Dreg
:¡kg 7 TrqBm
Com g.. Pump No.
T~ g. 24SLner Size
Max BGG 40 SPM
1.05 GPM
DC~
P........ 2,300
~v... """"'U'\II'
9.2 SLOW PS 35 4S
55 SLOW PP 200 300
87 Date 2/22195
Shale density
woe 10130
Jets.TFA 13-13-13
Bh Cost $6664
Dull . I H
Grade
Eat. pore pInS
ROPlShale
ROPlSand
Rig ReIe8M
Code Operations From 0600 . 0600
1.0 6 RIH to casing shoe at 1,7651 and fill pipe.
1.0 9 Cut drilling line 120".
2.0 6 Continue to RIH with bit #3. Fill pipe at 4,4651 and 6,1571. Washed 601 to bottom.
Encountered tight hole from 4,8501 to 5,0501 with 20K avg. set down.
20.0 2 Drill and survey with bit #3 from 6,218' to 6,9721. Slide f/ 6,819 to 6,844.
TIME
0600-0700
0700-0800
0800-1 000
1 000-0600
')
)
ARca Alaska, Inc.
Daily Drilling Report
"!jH~ ueSCrlpllon
8 1/2" Bit, Mach 1c AKO 1.00 motor, NMLDC, NM STAB, XO, MWD, XO FLT SUB, 6-6 1/2"DC, XQ, 4 HWDP,
DNT JARS, 16 HWDP. OAL 903.20'
tlHANO.:
Unl~ Utlla (' op 10 tIOltom)
3 (corr)
OD
We911
Grade
Connection CIaas
\.eng1h
uaee Last Inspected
45
19+X
5
5
19.5#
19.5#
G 41/21F prem 4220.24
8135 41/21F prem 1810.69
1/27/95
Hours On Jars
Daily Jar t# 1621-0042 DNT 49
~~em~(v~ \ Name
I::mpIoyer
~. .....1 (Y/N)
InJeCllon Well:
2M-23
Rate:
PrlAUr.
Fuel 6 W.ter
ì-uel on Loc.tlOnaW.Is) Fuel UNci (gills)
26410 4866
~ue Received (gals) ~uel Source
CPF-1
lm YVllter uo L.OC8IIOI1 IDDIIrun ¥Yater UIi4IO IDOlS)
In8dion
6BPM
950
"1ype Fluid:
Mud
Diesel
H20
730 840
LJrt watar Hec_-' (Dbts) Ì)/fw.tarlSOurce
670 Lake 93-12
,............ w...... un Loc;, IDDlllf.....oUIDIØ wale) usea (PDlS)
Volume
bbI8
"'bbIs
Dally Volume
Cumulative Volume
164 90
j)Q(aDle w.... Rtvd (bbIs) "f)otable Walar Sourçe
80 Lake 93-12
bbls 8972 bbls
Cutlngs Data
Weather Data
Temperature
P~
....
Safety I BOP Data
'"L.. BOP tes1lDiv function Last BOP Dnll
Dally
739 yds
calm
CONTRACTOR
1
35
14
2/16/94 2120/95
"\.a. I"f¿:;) urUl La. ...... un"
2120/95
L.asf"'I)ð'.1y Mtg LasI ~m C)rIl
2/21/95 2/19/95
:SplU (VIN) "Volume \galS}
NO
"1ype Spill 1tlpOrt Flied?
4yds
-48
ARCO
{,Lmulal'lf&
VVnã speed
~Ioraga ::ilia
UliIIlador
Alpine #1
-48 OF
lale 2/22/95
SERVICE
Alpine #1 Location
'weltmme
OTHER
Stgned
Donald R. Mckelvey
TOTAL
50
Time
Hours Code
Operations From 0600 - 0600
R~.l::~'V~D
APR 2 4 1995
A\ôs\a1 OU & Gas Con~ Commission
Anchor~l~
Road Maint Water Used fl Lake #91·23 = 2100 bbl
Road maint Water Used f/ Lake #93-12 = 1350 bbl
Road Maint Water Used f/ Lake #91/16 = 0 bbl
Road Maint Water Used f/ Lake #93/32 = 900 bbl
Cum= 2100 bbl
Cum=6200 bbl
Cum=10630 bbl
Cum=50050 bbl
Daily grey water disposed at CPF-1 =120 bbls
Total grey water disposed at CPF-1 = 2588 bbls
Daily cuttings to CC2·A ball mill = 0 yds
Total cuttings to CC2-A ball mill = 284 yds
TOTAL
Page 2
) ')
ARCO Alaska, Inc. Daily Drilling Report
AFC No. I Apt No. IDate IDaya6i8~ IÕÅ~
AX9329 5 2123/95
~ell <" Depth (MOl I '10) Prwioua oepth (MD) r-
AiPfÑ'E#1A i 7,568 6,972 596
Contrador "Dally Coat Cwn eo. Eat. eo. 0 eaw
POOL RIG #6 $103,013 $602,622
Operation at oeoo L_tC~ Ñøt c.g ~T_
Trip for new bit and MWD 13 3/8" @ 1,7651 N/A 14.6
MUDD"'T'" BIT ~T'" ....DLOG ~TA DALLING DA. T '"
Mud type LSND MBT 31.0 ppb BilNo. #3 DepIh 7,568 D.pt1 7,568 Rot Wl 160
Weight 10.+ ppg pH 9.1 Size 8.5 Mud Wl 10 P.U. Wt. 180 S.O.Wl 145
VISCOsity 39 see Pm 0.0 Mak. HTC Form.ion MSICLIS~vg Drag 20 Max Dn¡g 40
PVNP 14/14 Pf 0.20 Type AT J-POS .:¡kg 14 Trq 81m 2,800 Trq Surf 12260
"...... "'",....
Gels 4/10 Mf 0.60 Serial No. V81 BH Com g.. Pump No. 2 3
APIWL 5.4 CC Chlorides 500 ppm Depth 7,568 T~U- 45 Liw SIz. 5.5x12 5.5x12
HTHP 200 psi CC Oil % Footage 1,350 Max BOG 25 SPM 65 65
HTHP 500 psi OWR ADT/AST 30.7 DC Exponent 1.6 GPM 229 229
Solids 12.0 % ES RPM 771300 Shale cMnlity P.....re 2,350
~....... t'V"'LoP.I"
Sand tr % LGS 68.0 Iblbbl woo 10130 Ell pore praI 9.2 SLOW PS 35 45
Hole vol. 509 bbl Pit Vol. 487 bbl Jeta.TFA 13-13-13 'ROPISheIe 44 SLOW PP 200 300
Daily Mud 55,216 TotalMud $39,213 Bit Cost $6664 ROPlSand 75 Date 2122195
Rig Accept Dull S I H Rig Re-.e
0400 hrs 1/28/95 Grad.
SUr\!. No. 51 52 53 54 55
Depth (MO) 7022 7095.63 7215.71 7372 7489.6
Angle 50.2 50.1 51.0 51.9 52.3
Direction 327.6 328.1 327.1 327.0 328.3
T.V.D. 5558 5600.66 5676.88 5714.89 5846.65
Ven Sec. 3362.3 3418.6 3511.3 3634.2 3726.3
North 2838.5 2886.2 2964A 3067.5 3145.3
WfiYSt -1802.4 -1832A -1882.1 -1149.0 -1998.3
Dog Leg 1.22 0.55 1.05 0.53 0.14
TIME
0600-1130
1130-1200
1200-1500
1500-0230
0230-0400
0400-0600
Code
Operations From 0600 - 0600
5.5
0.5
3.0
11.5
1.5
2.0
2 Drill and survey with bit #3 fl 6,972 to 7,161. Slide 6,974 -7,005.
5 Circulate bottoms up prior to short trip at 7,005.
6 Short trip from 7,005 - 4,450. Nornal drag with bouncy type tight hole to 30K over.
2 Drill and survey f/7, 161 to 7,568. Slide 7,161-7,192
5 Circulate botoms up prior to POOH for new bit and MWD
6 Trip out for new bit and MWD.
)
)
ARca Alaska, Inc.
Daily Drilling Report
~MI\ ueSCrlpl100
8 1/2" Bit, Mach 1c AKO 1.00 motor, NMLDC, NM STAB, XO, MWD, XO FL T SUB, 6-6 1/2"DC, XO, 4 HWDP,
DNT JARS, 16 HWDP. OAL 903.20'
I'HA No.:
U"~ UaI. (lOP I ° ~ttom)
3 (carr)
00
W.~
GrD
Connection CIa.
LAngt1
uate Lasllnspeded
45
25xx
5
5
19.5#
19.5#
G 41/21F prem 4220.24
8135 41/21F prem 2404.9
1/27/95
Hours On Jars
Daily Jar It 1621·0042 DNT 79.7
~Õn (Y/N) INam.
emplOyer
'"Hpt. ......1 (TIN)
IneCllon
In8CItOn Well:
2M-23
Rat.:
Pr......r.
Fuel & W..r
f-ueI On Location. (gals) Fuel UMcI (gals)
31250 4660
~u.1 Received (gals) ~uel Source
9500 CPF-1
"I.," wawr \.In LOCiIIltOn (DDlllrun waler usea IDOlS)
900 1030
LJn water HeCtllYed (tIDI8) "LJn Waler ~urce
1260 Lake 93-12
6BPM
Volume
684
900
ì~ Fluid:
Mud
Diesel
H20
Ôbls
140
Þbls
141
~....... Wal8r \.In Loc;. (DOISf'--OIilDIe waler usea (DOIS)
t>aily Volume
Cumulative VoIum.
179 75
Ì'atIbIe w.. Rcvd (bbIs) "Potable Water Source
90 Lake 93-12
965 bbls 9,937 bbls
Cuttings Data
Weath.r Data
ì emparatur.
P.rsonnal
Safety I BOP 0...
1.ut BOP t8lltlUiv funçbon Lut BOP Drill
t> aily
4yds
-49
ARCO
1
35
15
2/16/94 2/22/95
'1.... t12::; urlll "\:... "I" urur
2/20/95
LaM :salety Mtg "tast :spIn Unll
2/22/95 2/19/95
Ì)pllI (YIN) Volume (gals)
NO
ì ypa Spill "T4epon Filed?
\.umUlalrve
VVncJ IþH<I
743 yds
5 ktS. CONTRACTOR
::;Iorage ::;ne
''l..nllllaClor
Alpine #1 Location
-55 OF SERVICE
'well Name
'''wale
Alpine #1
2/23/95
OTHER
SIgned
Donald R. Mckelvey
TOTAL
51
Time
Hours Code
Operations From 0600 . 0600
Road Maint Water Used fl Lake #91-23 = 0 bbl
Road maint Water Used fl Lake #93-12 = 600 bbl
Road Maint Water Used fl Lake #91/16 = 0 bbl
Road Maint Water Used fl Lake #93/32 = 450 bbl
Cum= 2100 bbl
Cum=6800 bbl
Cum= 10630 bbl
Cum=50500 bbl
Daily grey water disposed at CPF-1 =0 bbls
Total grey water disposed at CPF-1 = 2588 bbls
Daily cuttings to CC~-A ball mill = 0 yds
Total cuttings to CC2-A ball mill = 284 yds
TOTAL
Page 2
ARca Alaska, Inc. )
AFC No. I Apt No. ID.~
AX9329 7
Well .... ""-'. ,"'"
ALPINE #1A
Contractor
POOL RIG #6
OperallOn III 0600
Drilling wI bit #4
WD DATil
Mud type LSND MBT 32.0 ppb
Weight 10.1 ppg pH 8.9
VISCOSity 42 see Pm 0.30
PVNP 11/15 PI 0.20
Gels 4112 Mf 0.70
APIWL 5.6 CC Chlorides 400 ppm
HTHP 200 P8i 21.8 cc Oil %
HTHP SOO psi OWR
Solids 11.0 % ES
Sand tr % LGS 79.01blbbl
Hole vol. 615 bbl Pit Vol. 589 bbl
Daily Mud $2,216 Total Mud $41,429
Rig Accept
0400 hrs 1/28/95
Surv. No.
56
511
57
58
Daily Drilling Report
IDÅ~
Jprogr..
Eat. COlt 0 Dale 255
')
2/24195
~ (MOIl \lD)
7,823
Daily Cost
$93,263
LIllltC.g
13 3/8" @ 1,7651
BIT Do\ TA
I DaY"7iSÆ
P..vioua DepCh (MD)
7,568
Cum COlt
$695,885
"Next c.g
N/A
"Shoe Teet
14.6
IoIJO LOG Do\ T II
BilNo. 13 #4 DepIt¡
Size 8.5 8.5 Mud Wt.
Make HTC BHI Fonn.ian
Type ATJ-POS R417G Jkg
Serie! No. V81 BH CS200210 Com gM
~ 7,568 7,823 , T~II·
Footage 1,350 255 Max BGG
ACT/AST 30.7 5.4 DC Exponent
RPM 77fJOO 75fJOO Shale d.,sity
WOB 10130 4113 Est. pore prees
Je1s.TFA 13-13-13 5-10181-9 ROPlShale
BitColIt $6664 $9,411 ROPlSand
DuU 1 NO A s H Rig Rale_
Grade SE Log
60 &1
7,760 Depf't
10.1 P.U. Wt.
MSICUS~vlI Drag
14-TrqBm
Pump No.
110 Liner Size
25 SPM
1 GPM
Pressure
9.2 SLOW PS
44 SLOW PP
75 Date
Depth (MD) 7215.71 7314.53 7415.5 74811.& 7575.3& 76&8.88
_Angle 51.0 51.5 52.0 52.3 52.7 53 A
Direction 327.1 326.6 326.3 328.3 328.5 326.7
T.V.D. 5678.5 5740.3 5802.83 5848.211 51100.5 595&.74
Vert See, 3509.11 3587.0 3666.3 3724.8 37112.8 3867.5
North 2958.1 3022.7 3088.8 3138.0 31'6.0 32511.1
West -1889.2 -1931A -11175.2 -2006.8 2042A -2082.5
Dog Leg 0.88 0.61 OAII 2.15 OAS 1.73
TIME
0600-0630
0630-0830
0830-1200
Code
Operations From 0600 - 0600
DRI.lIIG OAT II
7,823 RotWl 165
180 S.O.Wt. 1 SO
1 5 M_ DnISI 40
2,800 Trq Surf 12260
,... .. .......,"
5.5x12
65
229
2,850
~u...l""\AW"l.M'\r"
35
225
2/23/95
2
5.5x12
65
229
Jet Plug
45
375
3
0.5 6 Finished POOH with bit #3
2.0 6 Lay down 3 DC·s and replaced MWD .
3.5 15 Test BOPE, 300 low prsr. and 5,000 high prsr. Tested accumulator and gas detection
equipment. No failures. Test witnessed by Bobby Foster AOGCC. See attached report.
1.5 6 Change bits, load MWD and pick up 9 jts HWDP
2.0 6 RIH with bit #4 to
4.0 23 Make MWD logging pass from 4,5721 to 4,7831
2.0 6 Continue RIH with bit #4. Make survey stops at 7,396 and 7,495
8.5 2 Drilling and survey f/ 7,568 to 7,823 with bit #4. Severe bit balling almost no progress
first 2.5 hrs
1200-1330
1330-1 530
1530-1 930
1930-2130
21 30-0600
)
-\
)
Daily Drilling Report
ARca Alaska, Inc.
1:IHA uescnptlOO
8 1/2" Bit, Mach 1c AKO 1.00 motor, NMLDC, NM STAB, XO, MWD, XO FL T SUB, 3-6 1/2"DC, XO, 4 HWDP,
DNT JARS, 25 HWDP. OAL 1,095.74'
BHA No.:
un~ u.a (' op 10 ttoaom)
4
OD
We~
GrecIe
Connection CIua
lengt't
Ual. Last Inspe<:tllcl
45
26x
5
5
19.5#
19.5#
G 41/21F prem 4220.24
8135 41/21F prem 2465.7
1/27/95
Hours On Jars
Daily Jar' 1621-0042 DNT 85.1
~Õt1 (Y/N) I Name
emplOyer
'"¡.¡pt. 1-....1 (Y/N)
In¡eChon Well:
2M-23
Rate:
Pr.....r.
Fuel & Water
~ueI On LocaIlOI"I' ",a.) FuelUMd (g.)
26850 4400
~uel Received (gall) ~ueI Source
o CPF-1
loin wawr \In LOCOaIOl"l (DDI8,run water UNa (COlli)
900 370
1Jn water HeCIIIVed (DOIS) "I.Jn water ~urce
370 Lake 93-12
In8Clla'l
6 BPM
Volume
230
ÒbI8
35
900
ìype Fluid:
Mud
Diesel
H20
bbIs
f-~.. wilier vn LOC. (DDlS/"t-OIaO.. water usea (COlli}
Dally Volume
Cumulaliv. Volume
164 95
"Potable WlIII.fIl Rcvd (bbIs) Potable Water Source
80 Lake 93-12
965 bbls 9,937 bbls
Cuttings Data
Wealh.r Data
Temperature
P.~el
Safety I BOP DlIII.a
1..ut BOP '..uDiv function La. BOP Drill
Daily
1 yds
-40
ARCO
1
35
15
2/23/94 2/22/95
'\.a. ""::; unu "La.. ....... urnr
2/20/95
'\... :saltty Mt¡ "La.. ::;pIlI unu
2/23/95 2/19/95
~plII(Y IN) "Volume (gals)
NO
~ ype Spill "A~rt FiItd?
",umulal,ve
'vv ncI speed
744 yds
10 ktS. CONTRACTOR
~lorage ~~e
'-"III lactor
Alpine #1 location
-70 of SERVICE
\veil Name
-"uate
Alpine #1
2/24/95
OTHER
Signed
Donald R. Mckelvey
TOTAL
51
Time
Hours Code
Operations From 0600 . 0600
Location inspection tour conducted by Steve Schmidt, (ADNR) and Jim?
(ADEC). All comments positive no corrective measures recommended.
Rig safety and environmental audit conducted by Herb Williams with POOL. Held
supervisors safety meeting and discussed audit results. Very informative and
constructive.
Road Maint Water Used fl Lake #91-23 = 0 bbl
Road maint Water Used fl Lake #93-12 = 900 bbl
Road Maint Water Used fl Lake #91/16 = 0 bbl
Road Maint Water Used fl Lake #93/32 = 600 bbl
Cum= 2100 bbl
Cum=7700 bbl
Cum=10630 bbl
Cum=51100 bbl
Daily grey water disposed at CPF-1 =130 bbls
Total grey water disposed at CPF-1 = 2718 bbls
Daily cuttings to CC2-A ball mill = 0 yds
Total cuttings to CC2-A ball mill = 284 yds
REGEIVED
Page 2
APH 2 4 199~
Alaska au & Gas Cons. Commission
Anchor2, "I
TOTAL
ARca Alaska, Inc.
AFC No. I Apt. No. I~~
AX9329 8
'Well
ALPINE #1A ..,~
C entrador
POOL RIG #6
OperatIOn 81 0600
RIH wI RR bit #2
MUD DATA
Mud type LSND MBT 30.0 ppb
Weight 10.0 ppg pH 9.5
viscosity 39 see Pm 0.35
PVNP 11/15 Pf 0.20
Ga. 4fT Mf 0.60
APIWL 5.6 CC Chlorides 400 ppm
HTHP 200 psi 21.0 cc O~ %
HTHP SOO psi OWR
Solids 11.0 % ES
")
2/25/95
DeptI (MDlI "C)
8,185
'baily Cost
$89,182
"LMtC8¡
13 3/8" @ 1,7651
BlTI».TA
Bit No. 14 RR#2
Siza 8.5 8.5
Milke BHI HYC
Type R417G DS40HF
SeriIllNo. cs200210 16096
DeptI 8185 8185
FOOCll9a 617
ADT/AST 14.1
RPM 75-300
Sand tr % LGS 91.01blbbl woe 4113
Hole vol. 651 bbl Pit Vol. 589 bbl Je1B.TFA 5-10181-9
Daily Mud $5,044. Total Mud $46,473 Bit Cost . $9,411
Rig Accept Dun 1 1 au A R
0400 hrs1 128/95 Grada X 1/16 PR
Surv. No. 62 63 64 65
Depth (MD) 7760.9 7854.03 7954.38 8048.26
Angle 54.2 54.6 55.0 55.8
Direction 327.3 327.8 327.7 327.5
T.V.D. 6011.16 6065.39 6123.23 6176.76
Vert Sec. 3941.8 3941.8 4099A 417&.6
North 3321.4 3385.2 34S4.5 3519.6
West -2122.9 -2163.S -2207.3 -2248.7
Dog Leg 0.93 0.61 OAS 0.46
I~Y"ãi9~
Pravious Cepth (MC)
7,823'
Cum Cost
$785,067
"Next Ceg
N/A
Depth
Mud Wl
Fonnatian
:¡kg
Com g..
T~g_
Max BGG
DC Exponent
Shale density
Est. pora PI8.
ROPlShale
ROPISand
H Rig Re'--e
)
Daily Drilling Report
IÕÀ~
Jprogr-
Eat. eo. 0 Cate 362
~ Teat
14.6
WDLOG I».TA
8,185 Dep4h
10.1 P.U. Wt.
MS~LIS~vg Drag
8 Trq 8m
Pump No.
110 LiI« Siza
42 SPM
0.92 GPM
Praaura
9.2 SLOW PS
54 SLOW PP
67 Date
DRI.l.tIGDATA
7,823 Rot Wt. 170
190 S.O.Wl 150
15 Max Drag 40
2,800 .T~ .S~." 12260
5.5x12
65
229
2
5.5X12
65
229
Jet Plug
45
375
3
2,850
~"""'. r"U.... U"."
35
225
2123195
RE'lEIVtD
APR ~ 4 199'5
Aiasku Oil & Gas Cons. O1mmlssun
j \nchora\~
TIME Code Operations From 0600 . 0600
0600-1900 13.0 2 Drill and survey with bit #4 fl 7,823 to 8,185. One nozzel plugged. Made several attempt
to correct build tendency by sliding. Drill string static break over wt. stalls motor.
1900-2000 1.0 5 Circulate bottoms up prior to POOH.
2000-2300 3.0 6 POOH to change bits and motors. Penetration rates prior to POOH below 20'/ hour.
Tight hole 5,010,4,300-4,560 and at 4,000 ft. Max'pull 50K. No drag after wipe.
2300-0130 2.5 6 Remove source and download MWD. Change bits. Change motor and lay down short de
Reioad MWD and orient mud motor.
0130-0300 1.5 8 Install new kelly spinner.
0300-0330 0.5 6 RI H to casing shoe.
0330-0430 1.0 9 Cut 60' driling line.
0430-0600 1.5 6 RI H with RR bit #2.
")
')
Daily Drilling Report
ARCO Alaska, Inc.
öHA uesc:npllon
8 1/2" Bit, Mach 1c AKO 1.00 motor, NM STAB, XO, MWD, XO FLT SUB, 3-61/2"DC, XO, 4 HWDP,
DNT JARS, 25 HWDP. OAL 1,085.18'
BHA No.:
Unllppe U8Ia (lOP 10 IJOttom)
4
OD
W.~
Graci.
Comection CIa_
t.ngfI
Date Las! Inspected
45
30x
5
5
19.5#
19.5#
G
8135
41/21F prem 4220.24
41/21F prem 2834.8
1/27/95
Houra On JaI1l
Daily Jar # 1621-0042 DNT 85.1
ÑCÜI'I (Y/N) ram.
employ.r
"Hpt. ~1Ie.1 (Y IN)
InjedJan
)njection W.II:
2M-23
Rate:
Pr....r.
Fuel & Water
~ueI On Loettion. (gals) FuelUeed (g")
22,313 4737
~u.1 Received (gala) ~uel Source
° CPF-1
~n ¥Yawr un LOC",1Oo I \lX)ISrun ¥Yawr U$8CI \IX)IS
900 600
ÏJn Water Hec:ewea (ÞÞIs) 1)n water :;)Ource
600 Lake 93-12
6 BPM
Volume
382
ÒbI$
70
900
ìype Fluid:
Mud
Diesel
H20
bbIs
t-",IK)" Will. un LOC. \IX)IS!"'--ouw" water UStKI \gga¡¡
Daily Volume
Cumulative Volume
164 90
Potable w.. Rtvd (bbIs) "'Potable Water Souree
90 Lake 93-12
452 bbls 1 O,38! bbls
Cunings DaUl
Wea1her DaUl
T emperalura
Pel"lOM8l
Safety I BOP Dala
1.ut BOP tea1IDiv function Lalli BOP Dnll
Daily
4 yds
-40
ARCO 2 2/23/94 2/24/95
"'Laatl"f.:::;urdl 1..ast 1-.,. unlr
CONTRACTOR 35 2/20/95
Last ::;ale'Y Mtg "Las! ~III Urlll
SERVICE 14 2/24/95 2/19/95
::;pllI I Y IN) vOlume (galS)
OTHER 1 NO
I ype Spill ~aport Flied?
TOTAL 53
Operations From 0600 . 0600
(.;\XI1ulall\le
Wind speed
748yds
10 kts.
::;Iorage ~I\e
"ttlllllactor
Alpine #1 Location
-70 of
W all Name
'\¡a¡a
Alpine #1
2/25/95
Signed
Donald R. Mckelvey
Time Hours Code
Road Maint Water Used f/ Lake #91-23 = 0 bbl
Road maint Water Used f/ Lake #93-12 = 2400 bbl
Road Maint Water Used f/ Lake #91/16 = 0 bbl
Road Maint Water Used f/ Lake #93/32 = 2100 bbl
Cum= 2100 bbl
Cum=10,100 bbl
Cum=10630 bbl
Cum=53200 bbl
Daily grey water disposed at CPF-1 =120 bbls
Total grey water disposed at CPF-1 = 2838 bbls
Daily cuttings to CC2·A ball mill = 0 yds
Total cuttings to CC2·A ball mill = 284 yds
TOTAL
Page 2
)
)
Daily Drilling Report
IDÅ~
JP~
1365
Est. COllI 0 0..
ARCO Alaska, Inc.
IP4:Il No. 9
IDeya -- SpudJt:à
9/10.5
P/Wioua Depth (MD)
8,185 -
"turn COllI
$884,018
1Mxt Ceg
N/A
AFC No.
IDa" 2/26/95
Depth (MDlI "D)
9,550
"Daily Cost
$98,951
1.atCIIg
13 3/8" @ 1,7651
BIT ~TA
AX9329
,';'A[PfNÈ· #1A
POOL RIG #6
Well
1:
Contractor
"Shoe T'"
14.6
Operallon . 0600
Drilling with RR bit #2
MUD DATA
DRLUlGDATA
IiAJD LOG ~TA
!Aud type LSND
Weight 10.1 ppg
vlK08ity 40 see
PVIVP 13/15
Gels 4110
APIWL 4.8 CC
HTHP 200 )Ii 14.6 CC
HTHP 500 )Ii
Solidi 12.0 %
Sand tr %
Hole vol. 725 bbl
Daily Mud $5,542
Rig Accept
BIlNo. RR#2
Size 8.5
Make HYC
Type SD40HF
Sen.lNo. 16096
DeptI 9,550
Footllge 1,365
ACT/AST 18.2
RPM 75-300
WOB 2-15
Jets.TFA 11-11-12-12
BitCosl
Dull S H
Grade
10
1310.1
41.1
328.1
Oeplh 9,40SolPf1
Mud Wt. 10.1 P.U. WL
9,550 Rot WL 180
215 S.o.Wt. 155
35 Met: Drag 50
10860
30.0 ppb
9.4
0.40
0.25
0.70
MBT
pH
IFormeIicn SDI "'SJCUS~vg DrIIg
Pm
':IIq 7 Trq 8m 2,800 Trq SIJ'f
~. .. '-1"
Cern gu IPump No. 2
T~SI· 46 Liw Size S.5x12 5.5x12
Max BGG 30 SPM 60 60
DC Exponent 0.78 GPM 212 212
Sha.. deMity P,....,.. 2,300 Jet Plug
.....u.... I""UMI""'I..Ø'I"
e.. pen pIMa 9.2 SLOW PS 35 45
ROPlSha" 78 SLOW PP 200 300
ROP/Sand 84 Date 2/25195
¡Rig R.....
Pf
3
Mf
Chlorides 400 ppm
Oil %
OWR
es
LGS 98.0 Iblbbl
Pit Vol. 496 bbl
T olal Mud $52,016
0400 hrs 1/28/95
66 69 72 75 77
8104.57 8351.87 8638.IV IV20.03 1011.68
55.1 55.3 54.1 52.2 51.3
326.4 327.1 327.2 328.6 328.1
SUN. No.
Depth (MD)
Angle
Direction
T.V.D.
6208.83 6341.11 6514.11 6613,45 6714.15 6173.61
4222.8 4426.5 4660.8 4185.8 5026.6 5243.6
3558.4 3728.1 3124.3 4114.0 4234.6 4411.6
·2273.9 -2386.6 -2514.5 ·2635.5 -2701.2 -2823A
1.64 1.08 OA2 1.36 0.27 0.43
Vert Sec.
North
Wf!f5t
DogLeg
TIME
0600-0630
0630-0700
0700-0600
Code
Operations From 0600 - 0600
0.5
0.5
23.0
6 RIH wI RR bit #2
3 Wash in hole fl 8,140 to 8,1851 no fill.
2 Drilling and MWD survey / log from 8,1851 to 9,550'
)
)
Daily Drilling Report
ARca Alaska, Inc.
!;t1A uescnpllon
8 1/2" Bit, Mach 1c AKO 1.00 motor, NM STAB, XO, MWD, XO FL T SUB, 3-6 1/2"DC, XO, 4 HWDP,
DNT JARS, 25 HWDP. OAL 1,085.181
5
00
Wei¡;1t
ared.
Unllplpe Uata (lOP 10 tIOtlom)
eonn.ction Cia.
Length
BHA No.:
'lJate La" Inspected
45
44X
5
5
19.5#
19.5#
G 41/21F prem 4220.24
S135 41/21F prem 4146.7
1/27/95
'Hours On Jars
Daily Jar 1# 1621-0042 DNT 112
~cõ'n (Y/N) ¡Name
employer
'"¡.¡pt. .....1 (Y/N)
IneC:tlon
6 BPM
Volume
612
"bbIs
105
"bbIs
900
Fuel 6. Water
"ueI On LOCIIÌIQ'. ¡gala) Fuel UMd (gala)
26,752 5,061
~u.1 ReceiYecI (gala) "'Fuel Source
9500 CPF-1
~n na18r un LOc:IILICIn IDDlSJ"\Jn naler U&8CIIDDIS}
960 900
ÎJn Water HeC:elYed (DDIa) "Un Water :SOurce
960 Lake 93-12
In8Ction WeU:
2M-23
Rate:
Pr_re
Type Fluid:
Mud
Diesel
H20
.."'...... w...... un Loc;. IDDlSf'-'OUIDI8 waler UIMQ IDOlS)
Daily Volume
CumulatIVe Volume
164 90
~atable w.... Acvd (bOIII) "'Potabla Water Soun:e
90 Lake 93-12
717 bbls 11106 bbls
Cuttings Data
Weather Data
Temperature
Persomel
Safety I BOP Data
Ì-alt BOP t_tlDiv function L.. BOP Drill
Dally
Alpine #1 Location
-60 OF
ARCO 2 2/23/94 2/24/95
La. t'f¿~ Un" "1.... ..n un,r
CONTRACTOR 35 2/20/95
i.a. ~'ety Mtg "1.... :spill LJn"
SERVICE 14 2/24/95 2/26/95
~plß {YIN} "\rolume ¡galS)
OTHER 1 NO
~ ype Spill Report Flied?
TOTAL 52
Operations From 0600 - 0600
3 yds
-44
I,;umulawe
VV ncI &peed
751yds
6 kts.
::;Ior age ::; ne
UJIII 'ador
'Well Name
\'¡ale
Alpine #1
2/26/95
Signed
Donald R. Mckelvey
Time Hours Code
Road Maint Water Used f/ Lake #91-23 = ° bbl
Road maint Water Used f/ Lake #93-12 = 3750 bbl
Road Maint Water Used f/ Lake #91/16 = 0 bbl
Road Maint Water Used f/ Lake #93/32 = 1800 bbl
Cum= 2100 bbl
Cum=13850 bbl
Cum=10630 bbl
Cum=55000 bbl
Daily grey water disposed at CPF-1 =0 bbls
Total grey water disposed at CPF-1 = 2838 bbls
Daily cuttings to CC2-A ball mill = 0 yds
Total cuttings to CC2-A ball mill = 284 yds
TOTAL
Page 2
AFC No.
ARca Alaska, Inc.
)
'Well
AX9329 /Apl No. 1 0
ALPINÊ ~#1 À .~;.
rate
Deya1õi11
Prwioua Depth (MD)
9,550i
"Cum eo.
$990,392
"Next Ce¡
N/A
Contrador
WDDATA
2127/95
Deplh (MOIl It'U)
9,940
Dally Cost
$106,374
~C;eg
13 3/8" @ 1,7651
BIT DATA
POOL RIG #6
OperatIOn at 0600
RIH w/OEDP to P&A well.
Mud type LSND MBT 28.0 ppb Bit No. RR#2 OepCh
Weight 1 0.1 ppg pH 9.0 Size 8.5 Mud Wt.
VISCOsity 40 see Pm 0.25 Make HYC Form.ion
PVNP 14/13 PI 0.10 Type SD40HF ~
Gels 3/8 Mf 0.70 Serial No. 16096 Com II"
APIWL 4.6 CC ChloridH 400 ppm Depth 9,940 T~pI
HTHP 200 psi 15.4 cc Oil % Footage 1,755 Max BGG
HTHP 500 psi OWR ADT/AST 23.9 DC Exponent
Solids 12.5 % ES RPM 75-300 Shale denlity
Sand tr % LGS 98.0 Iblbbl woe 2-15 eá pen prMI
Hole vol. 763 bbl Pit Vol. 496 bbl Jets.TFA 11-11-12-12 iROPlShale
Daily Mud $7,179 TotelMud $59,196 Bit eo.. ROPISand
Rig Accept Dun 2 2 ER A Rig Re....
0400 hrs 1/28/95 Grad. X , /16 TD
Surv. No. 81 82 83 14 as TO
Deplh (MD) 9474.23 9567.82 8660.14 8753.81 8846.87 8MO
!,"gle 48.5 49.0 48.7 48.2 47.8 47.8
Direction 328.8 328.1 328.11 331.2 3211.7 3211.7
T.V.D. 7034.09 7092.21 7155.118 7218.17 7280A6 7342.116
Vert Sec. 5314.8 5385.6 5455.1 5525.2 55114.2 5663.1
North 4479.3 4539.7 45I1U 4659.7 47J9.8 4779.3
West -2860.7 -2897.7 -2934.1 -2969.1 -3003.3 -3038.0
Dog Leg 0.73 0.81 0.68 1.93 1.28 0.02
TIME
0600-1400
1400-1600
1600-1630
1630-2100
2100-2230
2230-0530
0530-0600
)
Daily Drilli~g Report
DÅ~
Jpr....
390'
E.. Colt 0 Da.
~T_
14.6
..w lOG DATA
DRlllNGDATA
9,550 Rot Wl 185
225 S.O.Wl 155
35 Max Orag 50
2,800 Trq Surf 10860
... -,"
2 3
S.5x12 5.5x12
60 60
212 212
9,940 DepfI
10.1 P.U. Wl
SD I S~VII Drag
24 Trq an
IPump No.
50 Li1er Size
495 SPM
0.83 GPM
P~~ 2,300
~......... ..........\AI\I"
9.2 SLOW PS 35 45
75 SLOW PP 200 300
99 Date 2/25195
Code Operations From 0600 - 0600
8.0 2 Drilling and MWD survey and log from 9,5501 to 9,9401
2.0 5 Circulate bottoms up for samples. Pump high viscosity pill.
0.5 6 Pull out of hole to 9,5141. Lay down 12 jts. dp. In prep. for MAD pass.
4.5 23 Circulate and rotate in hole from 9,5241 to 9,9401 with MWD to re-Iog section.
1.5 5 Circulate bottoms up at 9,940
7.0 6 POOH. Download MWD. Remove sources. Lay down bit, motor, MWD and stabelizer.
Tight hole 4,9391 70K, 4,522' 40K, 1,9881-1,800' 1 OOK Acts like keyseat. Lost 2 hrs.
0.5 6 Run in hole with OEDP to lay cement abandonment plugs.
)
)
Daily Drilling Report
ARCO Alaska, Inc.
""HA UII&e:npllon
8 1/2" Bit, Mach 1c AKO 1.00 motor, NM STAB, XO, MWD, XO FL T SUB, 3-61/2"DC, XO, 4 HWDP,
DNT JARS, 25 HWDP. OAL 1,085.18'
t!HANO.:
unllplpe u.a (lOP' 0 tIOCIOm)
5
00
W.~
arD
Connection Clue
lengtI
'UIII. L.ast Inspec:ted
45
49X
5
5
19.5#
19.5#
G 41/21F prem 4220.24
8135 41/21F prem 4614.68
1/27/95
Hourw On Jarw
Daily Jar # 1621-0042 DNT 118
~õent? (YIN) Nam.
t:mpIOyer
~. folie.? (Y/N)
InJllclla'l Well:
2M-23
Rate:
PrtI88Ur.
Full 110 Water
~ueI On LOCIIiona (g..) Full LINd (gale)
22,028 4,724
~...I Received (gills) ~uaI Source
CPF-1
I.m wawr VII LOCaIIa'I lDOIII'\,/n wawr usea IDCIS)
InjectiCl1
6 BPM
Volume
404
"bbIs
70
"bbIs
100
900
Type Fluid:
Mud
Diesel
H20
960 900
1Jn w.ter Hec:elVacI IÞI*) "IJn W.ter ::iOurce
960 Lake 93-12
~"'...... WiMer VOl L.OC:. lDOIS,-...OUID.. wawr uøea IDOlS)
t>aily Volume
Cumulative Volume
164 90
"CItIIÐIe Will.. Rc:vd (bbIs) "Potable Water SoUIt:8
90 Lake 93-12
574 bbls 11680 bbls
Cuttings Data
Wlllllher Data
1 emperatur.
Pllreonnel
Safety I BOP Dat.
1... BOP t..vDiv function Lut BOP Drill
Daily
Alpine #1
2127/95
OTHER
2
35
14
1
52
2123/94 2/24/95
L.. KI:::; UI1II 1... on un..
2/20/95
L.. ~,.ty Mq 1.a. :spIN Utili
2/25/95 2/26/95
~pIIl (TIN) "Volume IIJ.")
NO
"'I ype SpiU "R~rt Flied?
2 yds
-32
ARCO
't,.;lJT1UlaI1V8
W no:! speed
753yds
10 ktS. CONTRACTOR
::>lorage ::irte
"U'IllIlaclor
Alpine #1 Location
-60 of SERVICE
\-veil Name
"'uate
Stgned
Donald R. Mckelvey
TOTAL
Time
Hours Code
Operations From 0600 - 0600
Road Maint Water Used f/ Lake #91-23 = 1950 bbl
Road maint Water Used f/ Lake #93-12 = 1050 bbl
Road Maint Water Used f/ Lake #91/16 = 0 bbl
Road Maint Water Used f/ Lake #93/32 = 1050 bbl
Cum= 4050 bbl
Cum=14900 bbl
Cum=10630 bbl
Cum=56050 bbl
Daily grey water disposed at CPF-1 =125 bbls
Total grey water disposed at CPF-1 = 2963 bbls
Daily cuttings to CC2-A ball mill = 0 yds
Total cuttings to CC2-A ball mill = 284 yds
TOTAL
Page 2
)
)
Daily Drilling Report
IÕÅ~
Jprogre.
Eat. co.t 0 DatI
ARCO Alaska, Inc.
AFC No. AX9329 1Apt. No. 11 I DatAl 2/28/95
Well ;.. DeptI (MOII'/D)
ALPINE '1 A '!: 9,940
Contrac:1Or Dally eo.t
POOL RIG #6 $109,472
Operation at 0600 Last CIg
WOC. Clean pits and repair brakes. 13 3/8" @ 1,7651
MJDDATA BIT I».TA
Mud type LSND
Weight 10.2 ppg
VISCOSity 43 see
PVNP 14/15
Gele 5/14
APIWL 6.4 CC
HTHP 200 psi CC
HTHP 500 psi
Solid. 13.0 %
Sand tr %
Hole vol. 763 bbl
Daily Mud $3,981
Rig Accept
I Days -.nee SpudIt:at.
11/12
Prwioua DepIh (MD)
9,940'-
Cum co.t
$1,099,864
"Next C4I¡
N/A
14.6
Shoe Test
MUD LOG I».TA
DRI..lMG OAT A
9,550 Rot WI. 185
225 a.O.Wl 155
35 Ma: Drag 50
2,800 T rq SII'f 10860
..~.. -,"
2 3
5.5x12 5.5x12
MBT
30.0 ppb Bit No. RR#3
9.7 Siz. 8.5
0.50 Make HTC
0.40 Type ATJP054
1.40 Seri.. No. V81 BH
400 ppm DeptI
% Footage
ACT/AST
RPM
Sha.. denllity P_re
pH
DepIh 9,940 DIpt1
MudWl 10.1 P.U. \\'t.
Pm
Fonn.ion Avg Drag
Pf
";,kg 14 Trq 8ft!
Mf
C~gu P~N~
Chloride.
T~ g_ 39Lner Size
Max BGG 31sPM
Oil
OWR
DC Exponent GPM
es
~\....w...""""'''''I''
LGS 109.0 Iblbbl woe
Pit Vol. 496 bbl Jets.TFA OPEN
35
9.2 SLOW PS
SLOW PP
45
e.. pore p_
ROPISh...
Total Mud $63,177
Bit CollI
ROPlSand
Rig Releaø
Date 2/25195
Surv. No. NONE
0400 hrs 1/28/95
Dull
Grad.
Depth (MD)
Angle
Direction
T.V.D.
Vert Sec.
North
West
DogLeg
TIME
0600-0930
0930-1200
1200-1300
1300-1400
1400-1500
1500-1730
1730-1830
1830-1900
1900-2030
RE(![IVED
APR 24 ~5
AI~ka .Oil ø. Gas r.on~_ ~ommfs)fon
: Anchora¡ "1
Code
Operations From 0600 . 0600
3.5 6 RIH to 9,940 wI OEDP to lay cement plug.
2.5 5 Circulate and condition mud and mix cement for bottom abandonment plug at 9,9401
1.0 17 Pump cement plug thru OE 5" dp at 9,9401 as follows: Pumped 10 bbl H20 followed by
308 sxs "G" cmt. wI .2% 0046 and .24% 0800 batch mixed to 15.8 ppg. Total slurry
volume 63 bbls. Displaced cmt. wI 4 bbl. H20 and 149 bbl of 10.1 ppg mud. Plug
balanced. Initial circ. prsr. 500 psi. Final 1000 psi. CI P at 12:52 hrs. Bottom of plug 9,94(
Top of plug 9,140'.
1.0 6 Pull out of hole slowly 12 stands to 8,8031
1.0 5 Circulate and condition mud at 8,8031 small amount of cmt. contamination.
2.5 6 Pull out of hole to 4,9501 spot 30 bbl. balanced HI Vis pili and continue POOH to 4,7001.
1.0 5 Circulate at 4,700' and batch mix middle abandonment plug cmt.
0.5 17 Pump cmt. plug thru OE 5" dp at 4,7001 as follows: Pumped 20 bbl H20 followed by
208 sxs "G" cmt wI .2% D046 & 1.5 5001 batch mixed to 15.8 ppg. Total slurry 43 bbls
Displaced cmt. to balance w/6 bbl H20 and 59 bbls 10.0 ppg mud. ICP 500 psi. FCP 7C
psi. CIP at 18:51 hrs. Bottom of plug 4,7001 top of plug est. at 411101
1.5 5 POOH 7stds dp slowly to 40321 Circ and condition mud fair amount of cmt. returns.
.riCO Alaska, Inc.
tjt\A uescflpuon
,"--'"
8 1/2" Bit, bit sub, 3-6 1/2I1DC, XO, 4 HWDP,
DNT JARS, 25 HWDP. OAL 1,000.931
tlHANO.:
6
uate Last Inspected
00
WeÏt1t
5
5
19.5#
19.5#
1/27/95
Hours On Jars
Daily Jar If 1621·0042 DNT 118
AcCldent"¡ (Y/N) Name
*YES Leo Anderson
In¡ection
1 n¡&Chen WeU:
2M-23
6BPM
"Volume
404
ÒÞIs
70
"bDIs
100
Daily Volume
Cutlngs Data
Dally
2yds
't;\mulatrve
755yds
'!:;torage ~rte
Alpine #1 Location
vv ell Name
Alpine #1
Sl\ned
Donald R. Mckelvey
Time Hours Code
2030-2330 3.0 6
2330-0130 2.0 6
0130-0300 1.5 6
0300-0600 3.0 13
TOTAL 11.0
Fuel & w..,
}.ue! On LOCIÜona (gall) Fuel UMd (gall)
19,164 2,864
~ueI Rec:Med (;ala) ~ueI Source
CPF-1
Ra'-:
Pr-..re
900
"'TypeFIud:
Mud
Diesel
H20
-----,
Daily Drilling Report
unllppe UMa (lOP 10 1SOGOm)
G,ø
Connaction cu.
Lengf1
G 41/21F prem
S135 41/21F prem
employer
POOL
"¡.¡pt. ......., (Y/N)
YES
llun "awn..., L.IIC4oo...., \--run na,.r u.eo \1Xa1
Cumulatllle Volume
574 bbls 11680 bbls
Weather Data Peraomel
ì emperature
-16 ARCO 1
"""nCI speed
12 Ids. CONTRACTOR 35
~Iß Uldor
-50 of SERVICE 21
liate
2/28/95 OTHER 1
TOTAL 58
500 960
1m wa., HeCelVfICI (ÞCIII) "Un w.., tiOUtCt
960 Lake 93-12
~...- w.... VII LOC" \1X)I5,-...O_ w...r UNCI \IXII,
166 98
~GùIbIe w..... Rcvd (bI*) "PeMble Water Sou~
100 Lake 93-12
8atMy I BOP DMa
1.ut BOP teatl\)iY tunc:tion Lut BOP Dill
2/23/94 2/24/95
"tUI ""::i unu "luI..nu"
2/27/95
1.... tialety Mt¡ "l.. öptII LJnII
2/25/95 2/26/95
;Spill (TINI "'V0IUI'ne W..'
NO
ì ype SpIll 1ùport Flied?
Operations From 0600 . 0600
POOH lay down 117 jts dp while waiting on cmt.
Ready rig floor and make up RR bit #3 and RIH to 13 3/811 casing shoe.
Lay down excess dp from derrick in mouse hole.
Clean mud pits and change brake bands while WOC.
* Note: Accident and investigation report will be completed and sent in as soon as
details are known.
Road Maint Water Used f/ Lake #91-23 = 900 bbl
Road maint Water Used f/ Lake #93-12 = 0 bbl
Road Maint Water Used f/ Lake #91/16 = 0 bbl
Road Maint Water Used f/ Lake #93/32 =0 bbl
Daily grey water disposed at CPF-1 = bbls
Total grey water disposed at CPF-1 = 2963 bbls
Daily cuttings to CC2-Ä ball mill = 0 yds
Total cuttings to CC2-A ball mill = 284 yds
Page 2
Cum= 4950 bbl
Cum=14900 bbl
Cum=10630 bbl
Cum=56050 bbl
_ .CO Alaska, Inc.
AFC No. I~~ lea.
AX9329 12
Well
~:~'~At.PlNE#1A fi
Cattractor . -~--'~ - -
POOL RIG #6
OperallOn at 0600
P/U 12 1/4" BHA
&IUD DATA
Mud type LSND MBT 30.0 ppb
Weight 10.3 ppg pH 9.5
V"1SCOSity 43 see Pm 0.35
PV IYP 12/13 Pf 0.25
Gels 4/17 Mf 1.60
APIWL 6.4 CC Chlorides 400 ppm
HTHP 200 psi CC m %
HTHP 500 psi OWR
Softds 13.0 % ES
Sand tr % LGS 102.0 !blbbl
Hole vol. 173 bbl Pit Vol 450 bbl
Daily Mud $2,055 Total Mud $65,232
Rig Accept
0400 hrs 1/28/95
SurY. No. NONE
Depth (MD)
Angle
Direction
T,V.D,
Vert Sec.
North
West
DogLeg
TIME Code
0600-0800 2.0 13
0800-0900 1.0 9
0900-1 030 1.5 6
1 030-1200 1.5 5
1200-1230 0.5 6
1230-1400 1.5 5
1400-1500 1.0 6
1500-1600 1.0 21
1600-1700 1.0 6
1700-1800 1.0 5
~-
1800-1830 0.5 12
1 830-1900 0.5 6
1900-2000 1.0 5
2000-2130 1.5 6
-...---.
~5- (11
Daily Drilling Report
ID6~
Jprogrea
-81751
Eà COllI 0 [)de
3/1/95
Depf1 (MOIl 'ID)
1765' (PBD)
"Düy Coet
$124,064
LastC8g
13 3/8" @ 1,765'
BIT IYoTA
IDayaw~
Prwi0u8 Depd1 (MD)
9,940"
~em COllI
$1,223,928
Nut c.g
N/A
14.6
Shoe T-'
BilNo. RR#3
Size 8.5
Make HTC
Type ATJPOS
Serial No. V81 BH
Depth
Footage
ACT/AST
RPM
I&JOlOG IYoTA DRUMG DATA
DepIh 9,940 0epf'I 1,665 Rot Wt. 80
Mud Wl 10.1 P.U. WI. 80 S.O.Wt. 80
ForrnIticl'l Avg Drag .... Drag
-:!kg 1~rqa.n Trq 8~
" .... -" "'","
Com gas Pump No. 2 3
T~ J8S 39 Lner Size 5.5x12 5.5x12
Max BGG 31 SPM
DC EJIponent GPM
Shale deMity Preewre
"-u.....P"'UW""tA\I"
£Ilpore~ 9.2 SLOW PS 35 45
ROPIShaIe SLOW PP
ROPISend Date 2/25195
Rig ReIe-.
woe
Jets.TFA OPEN
BitCoc
DuD 1 NO A
Grade E TD
R[~[r/[D
AP~ 2 4 1995
1\ ~ Oil & )!:as CO, IS. Commlss~n
..\nchora -"
Operations From 0600·0600
Wait on cement @ shoe. Clean mud pits and repair brakes.
Cut 701 drilling line.
TIH. Tight @ 2057'. Tag cement@ 40601, set 30k down. Test witnessed
by AOGCC J. Spaulding.
Circ/cond for trip.
Pump slug, POH V 24501.
Circulate, spot 30 bbl. Hi-vis pill.
POH.
R/U tongs, run 14 jts 3 1/2" tbg.
TIH V 2200'.
Circ/cond @ 22001. DIS batch up kickoff plug.
Lay kickoff plug: 20 H20 followed by 425 sx G wI 075% S001, .7% D65, .2% 046,
@ 17 ppg, slurry vol. 76 bbls, yield 1 cf/sk, displace wI 3 bbl H20 and 18 bbl mud.
POH 10 stds V 12741. Est TOC 16651.
Reverse circulate surface to surface volume.
POH, R/U tongs and UD 3 1/2" tbg.
---.
.-,
-~~co Alaska, Inc.
Daily Drilling Report
I'MA uesclIpoon
I:lHANo.:
Unllppe u.a II op '0 ~1IiCIm)
6
CD
w.¡grt
Grade
Connection 0...
Lengf'I
Uate Last Inspected
5
5
19.5#
19.5#
G 41/21F prem
S135 41/21F prem
1/27/95
Hours On Jars
Daily Jar # 1621·0042 DNT 118
AcCIdent? (Y/N) Name
CI'npIOyer
'"Hpt. ......7 I Y IN)
Updated rept on Anderson, PM
Injectlcn
lJ1j8dion WeY:
2M-23
Raw:
Pressure
Fuel" W.-r
'\-ueI On LocaÞana (gd) Fuel UMd w-)
25452 3212
~ueI ReceHed (gals) ~ueI Source
9500 CPF-1
un na.r vn LOC;cMIOI1IDD1Sf"un na.r UNO IDOlS)
6BPM
Volume
340
ÒbIS
105
"bÞia
195
900
"'type Fluid:
Mud
Diesel
H20
500 360
4Jrt ".,., HeCelVecJ IÞI*) "'Un "aler tIOUfce
360 Lake 93-12
h..1ÐI8 w..ør vn LOC:. IDDIS'-"'Ol&l)" _wr useo IIXMI)
Dady Volume
Cumulative Volume
640 bbls 12320 bbls
165 91
"Potable w.. Rcvd (bbIe) "P0CIIbIe Waler Source
90 Lake 93-12
CutJngs Data
Wee....r Data
, emper.w.
P~
SØty I BOP D..
'tat BOP 1ee1IUiv function Lat BOP DriI
Dady
Oyds
-10
ARCO
1
35
15
1
52
3/1/95 2/24/95
'"L.aat J"I'¿:i UnII "LuI""UM
2/27/95
Lasl ::iaTeIy Mtg Lasa :)pili Unll
3/1/95 2/26/95
:>pIIIIYIN) "VOIUm. (gale)
NO
ì ype Spill ~lpOrt Flied?
t;¡mulatrve
t'vna apeea
755yds
18 ktS. CONTRACTOR
~~llador
:>torage :>I\e
Alpine #1 Location
-50 OF SERVICE
Vv&ll Name
1Ja1&
Alpine #1
3/1/95
OTHER
Stgned
D.C.Bumgarner
TOTAL
Time
Hours Code
Operations From 0600 . 0600
2130-2400
2.5 15 Test BOPE, annular 350/3500, rams 500/5000 psi. Test witnessed by J. Spaulding
AOGCC.
5.0 6 UD excess DP, while WOC.
1.0 6 P/U 12 1/4" BHA for cement drillout.
0000-0500
0500-0600
Road Maint Water Used f/ Lake #91-23 = 150 bbl
Road maint Water Used f/ Lake #93-12 = 0 bbl
Road Maint Water Used f/ Lake #91/16 = 0 bbl
Road Maint Water Used f/ Lake #93/32 =0 bbl
Cum= 5100 bbl
Cum=14900 bbl
Cum= 10630 bbl
Cum=56050 bbl
Daily grey water disposed at CPF-1 = 200 bbls
Total grey water disposed at CPF-1 = 3158 bbls
Daily cuttings to CC2-A ball mill = 0 yds
Total cuttings to CC2-A ball mill = 284 yds
TOTAL 10.0
Page 2
~--
-,
-.
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
David JOhn~~
Chairm~' "
Blair Wondzell, B~
P. I. Supervisor 3/'3 ( '}r
John SpaUlding,f;r~
Petroleum Inspector
DATE: February 28, 1995
THRU:
FILE NO: n9zlb2cd.doc
FROM:
SUBJECT: Plug and Abandon
ARC a Alpine 1A
Exploration
PTO 95-18
Mondav February 27, 1995: I travelled to Arco's Alpine 1A to witness. the P&A
of the hydrocarbon bearing interval, 4630' - 4650' MD, prior to setting 4. kick off
plug and re-drilling Alpine 1 B.
I was not able to witness the placement of the bottom hole plug or the open hole
plug as I was in transit to the job site from Anchorage. I did witness the tag on
the open hole plug as 28,000# was set down and held for 10 minutes to verify
integrity. The open hole plug was tagged at 4060' MD with the bottom of the plug
estimated to be at 4700'MD. The area between the bottom hole plug and the
open hole plug was left filled with 10.1# per/gal. mud. The area between the
open hole plug and the kick off plug will also have 10.1# per/gal. mud. Both the
open hole and kick off plugs are balanced cement plugs using class G cement.
-
t
~';~
:~:J
Summary: I witnessed the cement plug on the hydrocarbon bearing interval of
Alpine 1A.
attachment: n9zlb2cd.xls
,~-,
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Plug And Abandonment Report
Operator: Arco Alaska Inc.
Operator Rep.: Dave Baumgarner
Lease No.: Well No.: 1A Sec. T-R
Total Depth: 9940' MD
Well Name: Alpine 1 A
PTD No.: 95-18
S1-T11N-R4E
Elevation:
CASING DATA:
Drive Pipe:
Conductor:
Intermediate:
0.0.11 Set @:
0.0.11 Set @:
0.0.11 Set @:
ft. With
120 ft. Surface:
ft. Prodctn:
20"
13 3/8
PLUGGING DATA:
1. Open Hole Plugs: 9940' - 9539' PBTD not witnessed
2. Open Hole Isolation Plugs: 4700' - 4060' tagged and witnessed
3. Perforation Plugs:
4. Annulus Plugs:
5. Casing Stub Plugs:
6. Surface Plug:
Casing Removal:
" Casing Cut @
II Casing Cut @
II Casing Cut @
II Casing Cut @
Feet
Feet
Feet
Feet
REMARKS: Kickoff plug to be set at 2200' - 1665' for a re-drill of Alpine 1 B
Distribution: Inspector (s) : John H. Spaulding
orig - Well File
c - Operator
c - DNRlDOG
c - Database
c - Rpt File
c - Inspector
FI-OOO (Rev. 3/93)
N9ZLB2CD.XLS
..-
--.
Date: Feb.28, 1995
Meridian: UM
Mud Wt.: 10.1 ppg.
Penetration
0.0.11 Set @:
0.0.11 Set @:
1765 ft.
ft.
""- --....
--
eM
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 9951 O~0360
Telephone 907 276 1215
~~
~~
February 26, 1995
David W. Johnston, Chairman
Alaska Oil and Gas Conservation Commission
300 1 Porcupine Drive
Anchorage, Alaska 99501-3192
Re: Sundry Notice to plug and abandon ARCa Alpine #lA
Permit No. 95-18
Dear Commissioner Johnston,
The ARCa Alpine #lA well has been drilled to 9940' 111), 7343' TVD and plans are
being made to sidetrack the well to a new bottom hole location. ARCa Alaska, Inc.
hereby applies for sundry approval with a variance to plug and abandon the ARCa
Alpine #lA, permit number 95-18. A detailed plug and abandonment procedure is
enclosed.
ARca requests a variance to the requirements of 20 AAC 25.105 (1) for the cement
plug #1 placed from 9539' to 9940'. ARCa proposes to place plug #1 per 20 AAC
25.105 (f1) using 100% excess cement volume over estimated hole size without
recording the actual location or integrity. This cement plug will be placed on the
bottom of the hole which will prevent any chance of the cement falling downhole.
See attached schematic for cement placement and volumes. The required P&A
surface plug, casing cut-off, and cover plate operations will be done as part of the
Apine #lB P&A.
If you have questions or require additional information, please contact Fred Johnson
at 265-1492 or myself at 265-6206 in our Anchorage office.
Sj:{relY, (
~!;J
Supervisor
KRU Drillsite Development
RECEIVED
FEB 2 7 1995
Ä\ô.ska ou & Gas Cons. Commission
Anchorage
AR3B-6003-93
242-2603
.-..
,-'
,-
ð.:J
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon...x. Suspend _ Operation Shutdown _ Re-enter suspended well _
Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate_
Change approved program _ Pull tubing _ Variance _ Perforate _ Other
2. Name of Operator 5. Type of Well: 6. Datum elevation (OF or KB)
Development
ARCO Alaska. Inc. Exploratory ..x. RKB 38' Above SL feet
3. Address Stratigraphic _ 7. Unit or Property name
P. O. Box 100360, Anchorage, AK 99510 Service N/A
4. Location of well at surface 8. Well number
1465' FSL, 2250' FWL, Sec. 1, T11 N, R4E, UM ALPINE #1 A
At top of productive interval 9. Permit number
773' FSL, 678' FEL, Sec 35, T12N, R4E, UM 95 -1 8
At effective depth 10. API number
50-1 0 3 - 2 0 2 1 1 - 0 1
At total depth 11. Field/Pool Wildcat
967' FSL, 790' FEL, Sec. 35, T12N, R4E, UM
12. Present well condition summary
Total Depth: measured 9940' feet
true vertical 7343' fe e t
Effective depth:
measured
true vertical
feet
feet
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length
Size
Cemented
Measured depth True vertical depth
80'
1735'
20"
13-3/8"
350 Sx AS I
350 Sx AS III &
650 Sx AS I
110'
1765'
11 0'
1765'
measured
RECEIVED
true vertical
FEB 2 7 1995
Tubing (size, grade, and measured depth
Packers and SSSV (type and measured depth)
Aiaska Oil & Gas Cons. Commission
Anchorage
13. Attachments
P&A wellbore.
14. Estimated date for commencing operation
February 26. 1995
16. If proposal was verbally approved
Description summary of proposal _
Detailed operation program X
BOP sketch _
15. Status of well classification as:
Oil Gas
Suspended _
2/'2..6f,~
Name of approver (3 roc -, UJo //lei -z:-r2 If Date approved
17. I hereby certify thpt the foregoing is true and correct to the best of my knowledge.
Signed Iv ,- V Title Area Drilling Engineer
~l )-- FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness Approval r:!? .;Þ d
Plug integrity"/ BOP Test Location clearance d d q..s. - t).¿ ð
- -) 'we uµy /
Mechanical Integrity Test _ S~bsequent form requi~e 1 0-..!::/..Q.2 q.~ d'
Approved C~inal Signed By ~e~r~
Returne<tJ ·d W J h t 3(( (9Ç ~;: ~ t,
aVI . 0 ns on Commissioner Date ! p(/~g (1'Ç
SUBMIT IN TRIPLICATE
Service
! fa? "'~
Date -z, 7,7 { ~ ";,
Approved by the order of the Commission
Form 1 0-403 Rev 06/15/88
~
¡F
..............-
ALPINE #1A
PLUG BACK PRIOR TO SIDETRACK DIAGRAM
5000 PSI WELLHEAD EQUIPMENT
~
~
20' RKB
665'
TOP OF CEMENT PLUG
CONDUCTOR AT
:::::~'r . - - ;.,=-
r.... ...1
4 J
~ .
! !
¡ ¡
WEST SAK il! ill
i~ ~:::::~ ~:::::: ~:::::~ ~:::::~!
:.:. :.:.,'. :. :.:. :'1
t:::·:::·~ -..;~..;;<;.>;;w;.If,,'" -.;;.ç;o;:..;; <;. ~ If" ,,,..;;ço;;<;'1f,, ~... ....."..;;0;;: ::.:::.:
L 8 BTC ,..........:=-;:,......................................................................................................... ..........1
- 0 L:·~............................................................................................................~~I
, ..' ............................................................................................................ '.
765' RKB ~~~"-" ~~~~~~~~~~~~~~~~~~r '--.:.-...u~~
,......................................................
,......................................................
,......................................................
,......................................................
,......................................................
,......................................................
,......................................................
,......................................................
,......................................................
,......................................................
,......................................................
.......................................... BOTTOM OF CEMENT PLUG 2200'
20"
MUD
LB/GAL
O.
CMT PLUG #3
HOLE
3-3/8" 68 LB/FT,
SURFACE CSG AT
6"
I 20 BBL H I VIS I
~___n_______n;
I I
I I
I I
I I
I I
I I
I 10.1 LB/GAL I
I MUD I
I I
TOP OF CEMENT PLUG 4430'
K-3 INTERVAL 4630'-4650' MD (4042'-4056'TVD)
BOTTOM OF CMT PLUG 4700'
RECEIVED
FEB 2 7 1995
Alò.Ska Oil & Gas Cons. Commission
TOP OF CEMENT PLUG 9539' Anchorage
J-4 SANDS 9639'-9734' MD
BOTTOM OF CEMENT PLUG 9940'
FJ 2/26/95
,~,~~""~~,~,~""
-,......................................................
,......................................................
-,......................................................
,......................................................
-,......................................................
,......................................................
-,......................................................
,......................................................
-,.......................................,............
,......................................................
t:'......................................................
......................................................
......................................................
~~~~~~~~~~~~~~~~~~~
~....................................
~ 20 BBL H I VIS I
i...._n_________J
10.1 LB/GAL
MUD
~.....,-.s,....-..........-~os-:"~................~
......................................................~
......................................................~
~......................................................
......................................................
......................................................
~......................................................~
.......................................................~
.......................................................~
.......................................................
,......................................................
.......................................................
.......................................................~
.......................................................
.......................................................
..........................................................
·................................................ill...
.""""......"",..."
.......................................................
~~~~~~~~~~~~......
8-1/2" HOLE
CMT PLUG #2
[2ME ARCT/CSET III
~J'J.:J ARCTICSET I
r~~T~~1 CLASS G CMT CMT PLUG #1
. ~ '-':~~
TO 9940'
...-..
~'
~
ALPINE #1A
PLUG AND ABANDONMENT PROCEDURE
Notify AOGCC 24 hrs. prior to beginning any P&A activity (907) 279·1433
1 . RIH with open-ended drill pipe to TD (9940'). Lay a 63 bbl (308 sx) balanced cement
plug from 9940'-9539'.
2. Pull up ten stands slowly, and circulate out DP.
Note: ARGO has requested the AOGGG waive the requirement per 20 AAG 25.105 (I) to test
this plugs location and integrity.Ve.f"þa..l (1 "-P p,ø çj eJ.. ,
3. POOH to 4950'.
4. Spot a 20 bbl hi-vis pill from 4950'-4700'. Pull up to 4700' and lay a 43 bbl (208
sx) balanced cement plug from 4700'-4430'.
5. Pull up 10 stands slowly, and circulate out DP.
6. POOH. Pickup bit with no jets. RIH and tag cement plug. Document plug location and -
integrity for AOGCC.
5. POOH. RIH with 3-1/2" tubing stinger on 5' drill pipe to 2450'.
6. Spot a 20 bbl hi-vis pill from 2450' - 2200'. Pull up to 2200' and lay an 75.6 bbl
(425 sx) balanced cement plug from 2200'-1665'.
7. POOH, laying down drill pipe as required for sidetrack drilling operation.
8. RIH with 12-1/4" bit. Tag cement plug. Document plug location and integrity for AOGCC.
9. Dress off cement plug.
1 O. Prepare for sidetrack drilling operation. The required P&A surface plug , casing cut-off,
and cover plate operations will be done as part of the Apine #1 B P&A
RECEIVED
FEB 2 7 1995
Alaska Oil & Gas Cons. Commission
Anchorage
,j u: ;tiAM AKCU ALÆ::'¥.A ftl l~ O. U 0 ¿ ~ 1"' . /j
~ ~, .---
~ : II itli ¡;;' ~~.\~;s:<
ARCO Alaska, Inc. UI I::::
· .. . If .. ,
~". I .1 II I n II I
I H II I I' II I
I II II I I' II I
I I' .1 . II I' .
· .1 II I .. II I
- I H .. . II .1 .
-- · II II . I' II I
, · - .. . .. .. .
· .. .. . .. ...
FACSIMILE TRANSMISSION ' 11111 ; II II: \
I ¡IIi iii il ü
I .1 I' I II II II
~ ~ .. ., . .. .. ..
-. :I :111 II;;;;;
.. .~__. . .. -.aa- ..
- .... .1 .1 .1 .. . II II .. H
?/:tS" 111111 Gill II ;1 ;;
Date; Time: IIII II I: III :: :: II
- II II II II I " ., .. ..
- I' . II I' . II II . ..
!! II !! !! ! !I It It I!
Number of Pages (Cover +): Z- .-
...
.-- - .. . - .. -
From: ~.!ð \k,H.NJON· Kuparuk Urill Site Development
P, O. BOX 100360
Phone: (907) Â (J ....J/c¡r t ANCHORAGE AK 99510-0360
FAX # 907 265-6224
Location: - ,,, . . n. - ATO-1269
,¡ti -
- -
To: 4-ç; ?c ( FAX #:
. . . -- --..
Location: 1 Phone #=
.....-
Copies To: .- . . . . , ". .
-- " . ..
~ .. - -
,
Subject: ._,/~ F.. £~y¿ Ý o ".e.~ rI(/AI' J cS C/.r11~"'" ~~ Ý
4~¡ðINé. (vA (s IO£T,~C.1< ) ¡g~(, ~/Ç; t
Comments: - -" , -..-
. .. - .. -.. ".
..' .
- RECFIVED.
-- -- " fER P 7 1995 -.
Alaska Oil & Gas Cons. Commission
--- ~.. ArllJ1'lQrage
,. . -,... . ,
- .,. .- ..-' - .- .
Anv CUIIstiqns c_all s'-.(1der. o.LOelia Brown. 'S¡-6825,
... I~
_ ~ 8 1 0 : 2 7 AM
ARca ALASKA INC
/---.
No. Ubi ~ r. o'~
,~.~
ARCO AI~Slka. Inc.
Post Office Box 100360
An~horage: Alagka 9951 O~o~an
Telephone 901 276 1215
~~
~~
February 24, 1995
David W. Johnston, Chairman
Ala.c;ka Oil and Gas Conservation Commis!;ion
3001 Porcupine Drive
Anchorage) Alaska 99501-319'.
Re: Weekly Operations Report
ARca Alpine #lA Pennit No. 95-18
Dcar Commissioner Johnston,
Attached is the weekly operations summary for the ARCO Alpine #lA well being
d-tilled in the Colville delta area. The Alpine #lA sidetrack was kicked off from the
original wcllburc itt ±1873' and luts been d~J,;ÛUlli:illy drilled tu úcpth uf 8000'.
Plans are being made to drill another sidetrack (Alpine #lB) after completing
operations on rhis well.
If you have questions or require additional infonnation, please contact Fred Johnson
at 265-1492.
SinceteI y ,
Fred Johnson
Drilling Engineer
RECEIVE[)
FEB 27 1995
Alaska Oil & Gas Cons. Comm\sS\Uí:
Anchorage
AK3!:! fjOO;H~3
242 ~¿6()3
6 8 1 0 : 2 7 AM
..late: 02/24/95
Paç¡e: 1
AR CO AL.~SKA IN C
,--...
( ,
--~,
No. Uo:¿Y P. 3/3
ARca Alaska Inc,
DAILY DRILLING REPORT
-------------------------~~~--------~-------------~-----------~----~~~~--~------
WEùL:ALPINE #lA RIG:~OQL #6 WIi ~6% S~CURITY;2
WELLID: AX9329 AFE: ~AX9329 TYPE:EXP AFE EST~$
AHl::A/t,;N¡'ï:NQRTH SLOP! BOROUGH STATE:AK h~I nuMSERt50-~03-.20211-01
FIELD: COLVILLE
SPUD: :1TAR'1' COMP: F!NAL~
---~~.~----~~-----~~--~-----------------------------------------~------~---_.~--
02/18/95 { 1}
TD: 2 460 I (2. 4 6 0 )
SUPV: DeB
02/19/95 ( 2)
TD: 4030'(1570)
SüPV:DCB
02/~O/95 ( 3)
TD: 5315' (1285)
SUPV:DCB
02121/95 ( 4)
TD : 6218 I ( 9 Q 3 )
SUPV~DCB
02/22/95 ( 5)
'I'D ¡ 6 972' ( 7 54 )
SUPV:D'RM
02/23/95 ( 6)
TD : 7568 I ( 59 6 )
SUPV:DRM
02/24/95 ( 7)
'I'D: 7 a 2:3 I ( 255)
StJPV:DP.M
MW: 10.0 PV/YP: 19/14 APIWL: 6.2
DRILLING 8.511 HOLE
Drill hard cement £/1660'-18001. NO turther hydrOcarbon
indications', Good cement at shoe and below shoe. TOR for
BHA. Drilling 6 I 5" hole, ~otat~ L./l873' I slide/rotot" ~o
kick off as per plan to 2124'. Drilling directional 8.5"
hol~ Lu 2.1f;O·.
DAILY;. CUM: ETD:$O EFC:
MW: 10.1 PV/'iP: 19/22 APIWL: 6.0
l1'RTT.LING 9.5ft HOLE
Drilling 8.5" hole f/2460/-4030'.
DAILY: CUM:' ETD:$O EFCz
MW~ 10.0 í:V IYP: 12/10 APIWL: 5.8
DRl1,,1.Jl.JSG 6.5" MOLE
Drilling f/4030-5315'.
DAIIll; $ . CUMt E'rD:$O €'FC ~ '
MW~ 10.0 PV/YP: 13/14 APIWL: 5.6
RIH Vi/BHA #3
Drilling f/5315-6218'. Unable to slide drill, ~OP nil.
Frequent motor stall. use of lubricants and soaps
ineffective. Good ROP w/rotary. CEll, pump d~ job. POH
f/bit and BHA Cnanges. ~hange out bit.
DAILY: CUM:. E'I'D: $0 EFC:
MW: 10.1 PV/YP: 12/14 APIWL: 5.4
DRILLING W/BIT #3
RIH to casing shoe at 1765' and fill pipe, Drill and survey
wi~h bit #3 from 6219' to 6972'.
DAILY: $ 0 CUM: .. ETD: $ 0 EFC: 0
MWt 10.0 PV/YP: 14/14 APIWL: 5.4
TRIP FOR NEW BIT AND MWD
Drill ana survey with bi~ *3 f/G97~ to 7$68',
DAILY: $0 CUM:' ETD:$O EFC:
MW: 10.1 PV/YP: 11/15 APIWL: 5.6
DRILLING W/BIT i4
Finished POOH with bit i3. Test aOPE. RIH with bit #4.
Drillina and survey f/756B to 7823. Severe bit balling.
DAILY:. CUM: ETD:SO EFC:
End of WellSummary for Well:AX9329
RECEIVED
t·· iT) f) -, Q 9 r
; . 00 ('J [, 7 ¡ ;/' ';,,;
''I ;\i,Oj Ui ¡ ;\ :~¡;;"" '.j Li: ;~~, I.,,~J\ Ii (Ïi\~;U"J"
t-,!" i¡o.if;)qtJ
.--
---
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
David Jo ~
Chairma~'
DATE: February 23,1995
THRU:
Blair Wondzell, <8~
P. I. Supervisor za
Bobby FOS~
Petroleum Inspector
FILE NO: AFZIBWCD.doc
FROM:
SUBJECT: BOPE Test - Pool 6
ARCO - Alpine # 1A
PTO # 95-18
Exploratory
Thursday. Febru~ry 23. 1995: I traveled this date to ARCO's exploratory well
Alpine # 1 A and witnessed the weekly BOPE test.
As the attached AOGCC BOPE Test Report shows there were no failures of any
I
equipment.
The ice pad location was clean and all extra equipment was stored in a orderly
manner. I made a walk thru of the rig and all equipment seemed to be in good
working order and the rig was clean.
Summary: I witnessed the BOPE test on Pool rig 7 drilling ARCO's exploratory well
Alpine # 1A - Test time 3 hours - no failures.
'."'='.ii
,~
.~-~
- -)
Attachment: AFZIBWCD.XLS
,~,
---~,
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
OPERATION: Drlg: X Workover:
Drlg Contractor: POOL ARCTIC Rig No.
Operator: ARCO ALASKA
Well Name: ALPINE #1A
Casing Size: 13.325" Set @ 1764'
Test: Initial Weekly X Other
MISC. INSPECTIONS:
Location Gen.: OK
Housekeeping: OK (Gen)
PTD On Location OK
Standing Order Posted OK
Well Sign ~
Dr!. Rig OK
Hazard Sec. OK
BOP STACK: Quan. Test Press. P/F
Annular Preventer 1 300/3,000 P
Pipe Rams 1 500/5,000 P
Lower Pipe Rams 1 500/5,000 P
Blind Rams 1 500/5,000 P
Choke Ln. Valves 1 500/5,000 P
HCR Valves 2 500/5,000 P
Kill Line Valves 1 500/5,000 P
Check Valve N/A
MUD SYSTEM: Visual Alarm
Trip Tank OK YES
Pit Level Indicators YES YES
Flow Indicator YES YES
Meth Gas Detector YES YES
H2S Gas Detector YES YES
DOPE Test Report
6 PTD# 95-0018
Rep.:
Rig Rep.:
Location: Sec. 1
DATE: 2f23Æ5
Rig Ph.# 263-3176
DON McKEL VEY
GARY GOERLlCH
T. 11N R. 4E Meridian
TEST DATA
FLOOR SAFETY VALVES:
Upper Kelly I I BOP
Lower Kelly ¡IBOP
Ball Type
Inside BOP
CHOKE MANIFOLD:
No. Valves
No. Flanges
Manual Chokes
Hydraulic Chokes
u
Test
Quan. Pressure P/F
1 500/5,000 P
1 500/5,000 P
1 500/5,000 P
1 500/5,000 P
Test
Pressure P¡F
17 500/5,000 P
46 500/5,000 P
1 Functioned P
2 Functioned P
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure 0
System Pressure Attained 4
Blind Switch Covers: Master:
Nitgn. Btl's: 6 ~ 2000
3,000 P
1,250 P
minutes 43 sec.
minutes 33 sec.
YES Remote: YES
Psig.
TEST RESUL T8
Number of Failures: 0 ,Test Time: 3.0 Hours. Number of valves tested 25 Repair or Replacement of Failed
Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspeçtor North Slope Pager No. 659-3607 or 3687
If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS:
GOOD TEST.
Distribution:
orig-WelJ File
c - Oper./Rig
c - Database
t;-"..14>t File
~"'"~ctor
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
FI-021 L (Rev.12194)
Waived By:
Witnessed By:
AFZIBWCD.xLS
BOBBY D. FOSTER
£) '-:.A~ E
~~ :--'...::J
-, ¡
1.,1 Þ
@J
,ð - K @ -'I @
Lr\.., -=:J JL, @ _ ~ ¡ru
TONY KNOWLES, GOVERNOR
ALASIiA. OIL AlVD GAS
. CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
February 15, 1995
Mike Zanghi, KRU DS Devel Supv
ARCO Alaska Inc
POBox 100360
Anchorage, AK 99510-0360
Re: Well #
Company
Permit #
Suñ Loc
Btmhole loc
Alpine. #1 A
ARCO Alaska Inc
95-18
1465'FSl, 2250'FWL, See 1, T11N, R4E, UM
1327'FSl, 1072'FEL, See 35, T12N, R4E, UM
Dear Mr Zanghi:
Enclosed is the approved application for permit to re-drill the above referenced well.
The permit to re-drill does not exempt you from obtaining additional permits required by law
from other governmental agencies, and does not authorize conducting re-drilling operations
until all other required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling a new hole. Notice may be given
by contacting the Commission's petroleum field inspector on the North Slope pager at 659-3607.
c
-----_.
David W Johnston
Chairman \.
BY ORDER o'FmE-GGM
jo/encl
c: Dept of Fish & Game, Habitat Section - w/o encl
Dept of Environmental Conservation - w/o encl
/~-.
-~
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 9951 0~0360
Telephone 907 276 1215
~~
~~
February 12, 1995
David W. Johnston, ChaÎlman
Alaska ail and Gas Conse1vation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501-3192
Re: Application for Pennit to Drill
ARCa Alpine #lA (Sidetrack)
Dear Commissioner Johnston,
ARca Alaska, Inc. hereby applies for a Pennit to Drill an onshore exploratory well,
the ARCa Alpine #lA (Sidetrack), on State lands near the mouth of the Colville
River. ARCa will act as operator for itself, Union Texas Petroleum, and Anadarko
Petroleum Corporation in evaluating acreage previously leased by ARCa.
The proposed sidetrack will be drilled from the same surtace location as the Alpine #1
well. The bottom hole location is approximately 1.0 mile northwest of the ARCa
Alpine #1 well.
Attached find the information required by 20 AAC 25.005(c), and 20 AAC 25.061.
All waste drilling mud and cuttings generated during the drilling of Alpine #lA will
be hauled to the Kuparuk River Field or Prudhoe Bay Field for temporary storage
and eventual processing by ball mill which will gtind the cuttings prior to their being
injected down an approved disposal well.
H2S has not been encountered in this region in any stratum shallower than the
Lisburne F01mation. Therefore, ARCa has not included an H2S contingency plan
with this Application and requests an exemption from the H2S req uirelnen ts.
However, all drilling mud, coreS and produced fluids exiting the wellbore will be
monitored for detectable levels of H2S. ARCa also requests an exception on 20
AAC 25.033(e,2,D) shale density requirement. The shale density technique does not
work well in Alaska due to the variable composition of the shales, and the chelnical
used in the shale density column is listed as an exceptional health hazard.
The Commission is requested to review this application for Pe1mit To D1ill as soon as
possible to allow approval in a short time pe1iod. This is a sidetrack drilling
operation from the oliginal well bore. Dlilling operations on the sidetrack will be
ready to begin this week. Your prompt attention to this matter is greatly appreciated.
The Commission is requested to keep confidential the following attachments to this
pennit application which are drawn from research and data proprietary to ARCa
Alaska, Inc.:
Pressure Info1mation
Proposed Drilling Fluid Progt"am
Pressure Analysis
Proposed Drilling Program
RECEIVED
fEB 1 3 1995
Alaska OU & Gas Cons. CommissIon
Anchorage
AR3B-6003-93
242-2603
y' .......
ARCO Alaska, Inc. ..oIIIIIIIIIII....
Post Office Box 100360 .. ~
Anchorage, Alaska 99510-0360 ",
Telephone 907 276 1215 ~ ~
Finally, the following are ARCO's designated contacts for reporting responsibilities
to the Commission:
1) Weekly Status Repo11 Fred Johnson, Dlilling Engineer 265-1492
2) Completion Rep011 Fred Johnson, Dlilling Engineer 265-1492
(20 AAC 25.070)
3) Geologic Data and Logs Mark McDelmott, Exploration Services 265-6394
(20 AAC 25.071)
If you have questions or require additional information, please contact Fred Johnson
at 265-1492 or myself at 265-6206 in our Anchorage office.
s~~~e;Y:_ !
MiketJ:;j)-
Supervisor
Kuparuk Dlillsite Development
RECEIVED
FEB 1 3 1995
Alaska OU & Gas Cons. Commission
Anchorage
AR3B-6003-93
242-2603
.-.,
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
1 a. Type of Work
Drill .L..
Redrill
1 b. Type of Well
Exploratory..L
Stratigraphic Test _ Development Oil _
Single Zone _ Multiple Zone _
1 0 . Field and Pool
Wildcat
feet
Re-Entry _
2. . Name of Operator
ARGO Alaska. Inc.
Address
P. O. Box 100360, Anchorage,
Location of well at surface
Deepen _
Service
Development Gas
5.Datum Elevation (DF or KB)
KB ht above sea level :40
6. Property Designation
ADL-25530
7. Unit or property Name
11. Type Bond (see 20 MC 25.025)
3.
AK 99510-0360
4.
1465' FSL, 2250' FWL, Sec. 1, T11 N, R4E, UM
At top of productive interval
N/A
8. Well number
Statewide
Number
600' FSL, 600' FEL Sec. 35, T12N, R4E, UM
At total depth
Alpine #1 A
9. Approximate spud date
#U30610
Amount
1327' FSL, 1072' FEL, Sec. 35, T12N, R4E, UM
12. Distance to nearest 13. Distance to nearest well
property line
2-16-95
14. Number of acres in property
$500,000
15. Proposed depth (MD and TVD)
600 feet 1.0 Miles (Alpine #1) 2560 Lease Acres 10600' MD, 7800'TVD feet
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2»
kickoff depth 1900 feet Maximum hole angle 510 Maximum surface 1146 psig At total depth (TVD) 3650 pSlg
18. Casing program Setting Depth
size Specification Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
26" 20" 94# B ÆB 80' 30' 30' 110' 110' Permafrost cement
16" 13.375" 68# L-80 BTC 1735' 30' 3D' 1765' 1765' ± 350 sx ASIII , ±600 sx AS1
8.5" 7" 29.0# L-80 BTC 10570 30' 30' 10600' 7800' ±275 sx G
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured 7500' feet Plugs (measured)
true vertical 7500' feet
Effective depth:
measured
true vertical
feet Junk (measured
feet
Casing Length
Structural
Conductor 80'
Surface 1735'
Intermediate
Production
Liner
Size
Cemented Measured depth
True Vertical depth
350 sx AS I 1 1 0'
-3$0 ~I' # 1/1 1765'
~ $0 $1(. Jf.S I
RECEIVED
FfS 1 4 1995
Alaska Oil & Gas C
AnChor~n~. Commission
Drilling program ..x..
report
20 "
13-3/8"
110'
1765'
Perforation depth: measured None
true vertical
20. Attachments Filing fee ..x.. Property plat .1L. BOP Sketch..x. Diverter Sketch _
Drilling fluid program lL Time vs depth plot .x.. Refraction analysis _ Seabed
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~< /}~ Titlle KR U OS Development Supervisor
( : Commission Use Only
Permit Number number I Approval d,te _/ --
~Ç-/~ 50-/03-.202.//-ð/ Dd-(J~ 1~
Conditions of approval Samples required ~y e s _ N 0 Mud log required X Yes
Hydrogen sulfide measures _ Yes J:!:.- N 0 Directional sUJ.Yey required X Yes
Required working pressure for BOPE _ 2M; 3 M ; ..£. 5 M: _ 10M; _ 5 M
Other:
Date
'-/0/K
See cover letter for
other requirements
N 0
No
Approved by
Form 10-401 Rev. 7-24-89
Original Signed By
David W. Johnston
Commissioner
by order of
the commission
Date
;J II 6~ /'1 Ó-
Submit in triplicate
)
)
PROPOSED CASING AND CEMENTING PROGRAM
ALPINE #1A
(Per 20 AAC 25.005(c)(4))
NOTE: ALPINE #1A IS A SIDETRACK BELOW SURFACE CASING,
THE 20" CONDUCTOR AND 13-3/8" SURFACE CASING HAVE
ALREADY BEEN SET.
R EGEIVED
FEB 1 3 1995
Alaska Oil & Gas Cons. Commission
Anchora '"
')
ALPINE #1 A (SIDETRACK)
WELLBORE SCHEMATIC
)
1'»'.:,.,',.
.>,','.'.',',.
1::).:>:
t·,····
5000 PSI WELLHEAD EQUIPMENT
!¡!!:t~Æ
:::::1 20" CONDUCTOR AT 110' RKB
:':'/H
t·:;::~
.... ...,
~ ~:::::~ ~:::::~ ¡
:::.::.:~.::.:
:[~j 13-3/8" 68 LB/FT L-80 BTC
SURFACE CSG SET AT 1765' RKB
[~]~:)y
1611 HOLE
14-~. ::;.
¡l:;';:::"::::
.......
f:~·:·:::~·:·::::
.......
r~ ~:::::~ ~:::::~:
t·:···:·-·,
t::·::·::·::·:'
.......
(''::::.:::
~:;.~.~.~
8-1/2" HOLE
RECEIVED
~'"
~............
~............
\............
~............
............
............
.............
t............
............
.............
\............
~............
~............
\............
~' ............
............
-~':.~
~,~ FEB 1 3 1995
............,
~~~~~ AI kaOJ&G
~~~~~ l"\Ias i as Cons. Commission
~~~~~ Anchora ~
~~~~~
............,
............,
~~~~~
~~~j 7" PRODUCTION CSG AT TO ±10400'
NOTE: 20" CONDUCTOR AND 13-3/8" SURFACE CASING ARE ALREADY SET
FJ 2/12/95
)
)
Cementing Program
13-3/8" Surface
Casing Size:
Hole Size:
Depth:
Top of Cement:
Excess Calculated:
BHT (Static):
BHT (Circ):
Casina
13-3/8", 68#, L-80
16"
1765' MD, RKB
Surface
100% Lead, 25% Tail
45°F
60°F
Note:
13-3/8" has already been run
Slurry Components and Properties:
Preflush: 20 bbls water
Lead: Arcticset III with 1/4#/sx D29 (cellophane flakes) (800' to surface)
Slurry Weight
Slurry Yield
Thickening time
12.1 ppg
1.94 cu. ft./sk
6+ hours @ 60° F BHT
Tail:
Arcticset 1 with 1/4#/sx D29 + .05% D13 retarder (1800' to 800')
Slurry Weight
Slurry Yield
Thickening Time
15.7 ppg
.93 cu. ft./sk
2-1/2+ hours at 60° F BHT
Cement Volume Calculations (Based on 16" oauCJe hole):
Top West Sak, TMD =
Design lead from 200' above the Top of West Sak =
Annular area =
Lead length * Annulus area =
Excess factor =
Cement volume required =
Yield for Permafrost Cmt =
Lead Cement volume required =1
1 000 ft
800 ft
0.4206cf/lf
336 cf
1000/0
673 cf
1.94
350 sxl
TMD shoe =
TD - 200' above West Sak) * (Annulus area) =
Length of cmt inside csg =
Internal csg volume =
Cmt required in casing =
Total cmt =
Excess factor =
Cement volume required =
Yield for Class G cmt =
Tail Cement volume required =1
1 ,800 ft
420 cf
80 ft
0.8406 cf/lf
68 cf
488 cf
250/0
61 0 cf
.93
656 sxl
RE~EIVED
FEB 1 3 1995
Ã\aska Oil & Gas Cons. CommIssion
Anchora .:'
) )
Cementing Proqram-cont.
7" Production
Casing Size:
Hole Size:
Depth:
Top of Cement:
Excess Calculated:
BHT (Static):
B HT (Circ):
Casing
7", 29#, L-80
8-1/2"
10,400' MD, RKB
500' MD above top of J-4 Jurrasic target (9315'
50%
150°F
1 250 F
MD)
Slurry Components and Properties:
Preflush: 20 bbls Water Preflush
50 bbls ARGO Spacer (weighted to 1.0 ppg over mud wt.)
Slurry:
Class G with 0.15 gps D47 (defoamer) +3.0% D53 (gypsum) + 0.65%
D65 (dispersant) +0.1 gps D135 (latex stabilizer) + 1.0 gps D600
(latex) + 0.07% D800 (retarder)
Slurry Weight
Slurry Yield
Thickening Time
15.8 ppg
1.19 cu. ft.lsk
±4 hours at 1300 F BHT
Cement Volume Calculations (Based on 8-1/2" oauoe hole):
TMD=
Top of Target, TMO =
Want TOC 500' above top of J-4 target =
Annulus area=
(TO- TOC)* Annulus area =
Length of cmt wanted in csg =
Internal csg volume =
Cmt required in casing =
Total cmt =
Excess factor =
Cement volume required =
Yield for Class G cmt =
Cement volume required =1
10,400 ft
9,315 ft
8,815 ft
O. 1 268
200 cf
80 ft
0.2085
17 cf
21 7 cf
50%
325 cf
1.19
275 sxl
Note: Actual cement volume will depend on open hole and caliper log interpretation
RECEIVED
FEB 1 3 1995
A'aska Oil & Gas Cons. Commission
Anchora ~,
)
)
PRESSURE INFORMATION
ALPINE #1A
The following presents data used for calculation of anticipated surface pressures (ASP) during
drilling for the Alpine #1 well:
Casing Pore
Casing Setting Fractu re Pressure Pore ASP
Size Depth Gradient Gradient Pressure Drilling
(in.) (ft. TVD) (Ibs/gal) (Ibs/gal) (psi) (ps i)
20" 110' 11 .4 8.6 49 53 - Diverter
13-3/8" 1765' 14.6 9.0 842 1146 - BOP
7" 7800' 16.2 9.0 3650 2792 - BOP
Procedure for Calculating Anticipated Surface Pressure (ASP)
ASP is determined as the lesser of 1) surface pressure at breakdown of the formation
at the casing seat with a gas gradient to the surface, or 2) formation pore pressure at
the next casing point less a gas gradient to the surface as follows:
1) ASP = [(FG x 0.052) - 0.11]D
where:
ASP = Anticipated Surface Pressure in psi
FG = Fracture Gradient at the casing seat in Ib/gal
0.052 = Conversion from Ib/gal to psi/ft
0.11 = Gas gradient in psi/ft
D = True vertical depth of casing seat in ft RKB
CR
2) ASP = FPP - (0.11 x D)
where:
FPP = Formation Pore Pressure at the next casing point
ASP Calculations
1. Drilling below conductor casing (20")
ASP= [(FG x 0.052) - 0.11]D
[(11.4 x 0.052) - 0.11] x 110
53 psi
CR
RE~£\VED
FE8 1:3 1995
Alaska au & Gas Cons. Commission
Anchoré. "'.
ASP = FPP - (0.11 x D)
842 - (0.11 x 1800)
644 psi
')
)
2. Drilling below surface casing (13-3/8")
ASP = [(FG x 0.052) - 0.11]0
= [(14.6 x 0.052) - 0.11] x 1765
= 1146 psi
CR
ASP = F P P - (0.11 x D)
= 3650 - (0.11 x 7800)
= 2792 psi
Casing Performance Properties
Internal Collapse Tensil Strength
Size Weight Grade Cnxn Yield Resistance Joint Body
Ü1ù (Ib/ft) LQ..ill LQ..ill (1000 Ibs)
20" 94 B PEB Conductor Casing
13-3/8" 68 L- 80 BTC 5020 2270 1556 1556
*9-5/8" 53.5 L-80 BTC 7930 6620 1329 1244
7" 29 L- 80 BTC 8160 7020 746 676
* Contingency intermediate casing string
Casing Setting Depth Rationale
20"
110' MD 1 110' TVD
Conductor casing to provide sufficient anchor
and fracture gradient for diverter system.
1 3 - 3/8" 1765'MD/1765'TVD
Surface casing to provide good anchor for
BOPE and sufficient fracture gradient and
well control while drilling to next casing
setting point.
9 - 5 18" ±3000' MD I 3000' TVD Contingency intermediate casing that could be set
if high mud weights are required to drill the K-
10 and K-5 intervals. This intermediate casing
would provide sufficient fracture gradient and
well control while drilling to next casing setting
point.
7" 7800' MOl 7800' TVD Production casing to cover all open hole and
all previously set casing to allow
comprehensive testing of the well. This
casing will not be set if logs indicate the well
is a dry hole.
RECE\VED
FEB 1 3 1995
Ala.ska Oi~ & Gas Cons. Commission
Anchora ...~
)
')
PROPOSED DRilliNG FLUID PROGRAM
and
DRilliNG FLUID SYSTEM DESCRIPTION
ALPINE #1A
(Per 20 AAC 25.005(c)(6»
RECE\VED
FEB 1 3 1995
Ä\asKa UH & Gas Cons. Commission
Anchora :""
')
ARCO ALPINE #1 A
ANTICIPATED PORE PRESSURE, MUD WEIGHT,
AND FRACTURE GRADIENT
o -i-, ^~ ~,,,L~~L,~,~¡mL!Llt.m^+ ~~~~^"I',wLVi^~~w~~Jv)"+"IL]LlWLt!_~W~'^ Wlt^tv+m,LW: . ~lm~~ '^ w.
: : 1 : ::: : ~: ¡ : : ~ ¡ : 1 !: ~: : : : : : : :
, .". ---,,--- ---....,..,.-c.... n~ .,,-O----',--'3;---oo... ---oo---~--^---oo---~.--- n. --"r--oo'" --"t---<-n ---oo.^ '--oo'" --- ,.,..---oo---<nn.--- 0000 n. --- .,
+ '''+~ +-- AY1,^+wf" ~~) 1~+1--^t'^+" L+,+ ~im:w¡"T"1nn1 W~-rA' l' n+n¡___, n+-+~r'A: ¡ " '-t"¡n....
...¡... ....~..·rv . ,.~.". ...:,...>...<..... ",1....... ·..<....oo"·$.^1···oo....... ...~...l..oo..·~..^"'^·:··· ·...oo...i...tw~... w.",... "'<Co"'~"'i""'" ...<....:....,......... ~~.+. ~
-PR~-"+J. ¡ H+. ;-4.!L+-+._~-;+.Ä~Lþl~ELOT;4.i ¡ ¡-+E;v^lJ
;~~E J±.4±8-[w.+1~t:~I'.£E~:1.f.tqj:ft1t.-.-.r= i~~[8:þ-mt±æ±t~I~1lf:lt.I::. ~I~
: ¡: ¡ :: : 1 ~!: ¡:: c: J : ¡ : ':: :
·2000 L ~ -,. - -1-- ~ ~ ..'" .... -....,...... .>........... ~ ...,...,...,. ~ - ""'~r" --
~1.; .-!.~.-~..~ .:·:·.~.J~l if~.- _*f. ~t:\ff·I~-.:~ ..:'~[~t~~.~~~~A~l.~;;
-3000 . ...., ....,-E^y ,....-$..w ....L.............w.-.... "'........ ...., ....w.....-.t....A>....'1 . ....A"'-'.... ........rA'I ....H'.....J........~,..."'-..... ,w.:N....... ........"'.......>'^, .
t .... - ~ .t. .~M:~fj±~~ìG~l-!,i"¡i.trHt.tr.î.piTttt.tI....I~~r~~:..= :*H'" ::: .~':'~ ~
.(" ,+v ,,¡ "....-0-' v.... 4^,"'-w.r.....w.... w ""[' v ,....w.-. ~I"^I-" '" "-Il", '''' " "" - ",.
-.J ... ...i... ....'... ... i...,...L ...i... .... .... ...p...L.......L. ... T .... ...LU....... ...i..¡... ..>- . - ....Lu.. ... .... _..- on ... on..,
-4000 -t~= * on H +¡~ on =4ttt=-T~rt=.:,T-=.*'--= ___ _. _
.,~",,~.~... 'A';"'-E'" "'fA" ~""...I.."'...:..... ..., ...l..·~..m~..· .....:... ... ..1... ....:...o)...t...:..·J....~...t··tL..:....~.... ....;....oo...:.... .
w L,tw., v:: ,,^Lr,,"^wLljv)---+wLl..L ¡ ¡ v V^ ¡ ¡ ~L,Ll^"ljJ v vL.j-~ L^~~Jw~" " ..., "" _~^,... v ~
¡:: -5000 - ...... '''H:::. ti1:±i±LtiIl±t:£±t'r,,,LL~~L1~~<t:~~~t~lri~::L'¡~!"~Y^f¡~: ¡ ~. ¡... ... .... .......
flj _..~ v~w",~w'µ"+~""+"'~~+""~"'+~~U+N~^' =r! ~.... ^W~"~WMW+"V~W'+"w~", 'V+N+'Wf---....~~v~m: v] "+v-1--,,......, "t: ·1'...·.......~N^(~~Nf
C ...}....:....l... ... H ;: :·~t:~~~....~·..t: ···~...m: "'r'" ..+.... '?A"~""~"'I: ...R~·"+"~···· .....t...i"··t=E..¡... L. ~ :.~â,- ~..(~ nAi'W'+"+"'+": ...~....:.... ..,. ~.
: L :: ::: t: l . : : ~: : i : -----+-: . : 1 : i::' U
C ¡ ,,,... "'1wrw ~~I.~~rT~. ..:t=T~~~I~ w¡_ ·~~'I¡~.r~IJ...l.~ ~:t... ~~T~~·~r.:~·..1 T' '~1~~ ~rr~;~~r' ~L.L.. ....... ...~....c~ .:. ':~.
~ -6000 t<:...l...~+~ -p-rt' ~L~r-t+.;...;.... +-h... - ~-
:::J ... ""'I·"r+": , :: 'r r i : I : fr...f... ....j..., ... ·"¡"·r-++++..+...¡...t·"["'I"'+·T++ .i. FRACTLqEG~IEM- +- -
~ -... ....... :~I~¡~t~LIJ:::::T:T::Lr:t"L 'AAAoo~T±Lf:::ct"·j"rrT:a~·rTUµ:!:f4tt:::: =tf ::: ::
~ -7000 -~LU:± i:Jll-+±i±tju±J±tLt.H-J=~ct:L_ _: -W- ~...
--+- ~...L...L.!+L.~..'i++I...t...Lt+..l...t...I·..·'J"'I!...·t...t....r.t...t..++...lJ...·~..·: ..r·~ .+..: ...j.. '~~ ¡,.. :'~~-'
.' ..:... +.+.. L .L.~..._... ~....¡. "}'" :....1.. ..:....J "'-00"':"'.1.. ..:.. .J... t .'.1..., . ...:.....0).. 'o)"':~"'i" ·t·· .~... r".L.. ~,. ..[...oo"'~' "'f ..:... ·r· +. ... ··..t..·t ...oo....,.. .<-
-- -+- -W:L- w.......L¡... -L.W.. ¡~ ~ --4-+-'- !-:.J.... - - .....¡....! _[:",+,,~,w
: : : : : II: : E: ~ :::] ~: :: ~ : ~ : : ¡ : 1 : J : t : 1 : I : ~ : i:
~.....;...~... ~...:.... ...;... ... .,...j....~.... ..·"'...<·..."'..T...~...oo··· . ....,..."'...:...4·"1·'·t···t...:,··1..·"'·,· ...~.:....,~....., ~ t· .."..,.,........oo... ....,. .....~[.
8000 _~L^L i~: j, ¡ ~¡- :T,!¡+,LL_li--r,L'r-Lr.lmL"tA'f! ,1mLJAv wty+",Lt",LA"L,L1jy~- J...J....i-,.J-,p
- ~ : .).... .)...1...1....~.... ....j...á...r: ....L.~....,..,¡..+...l.."....{...t... ····t· ...~....L.L.J..+-.¡...1 1 + ~ j: ~ ~ ~ ·l::t: v. ~~.~.
: :: :i:: :: .¡~: :~:: :!: ~:l¡:: :~: :
-,.(-... ... .. ...~.."............. ··.......o)..·r..oo...>"..~....·oo·, ..·-c....'1'['''*·..... v.... ........~·~"'.................F......w ...."/'y'·.........r "'VA _W.A .,~......"., ...·'f~ ... .'^"":^"
. ¡ :: ! ~"'"'y"t'''1 ~+'+~~V^t~"++I< [~ :" v+"r~t"t"l~+ ; J t "I w.+-t^"r-t-+"+,,~ 'w Lv -, "': '" vr....: '^t·...
..+... ...~...-E... ....$... ·..i..·_..·.,.....¡...j...:....t.....:..n.J..j...:... ....... > . > . r..·r..·;·...~... ...oo...~....;·1.. ....!...-c.-¡ :
-9000 ' i: ~ ¡ ¡ 1+ r~~µ^L ....l,+....Ll....~~wl,,1~~w.L.J~4+....L+^~ ,wj....j,...,t· : : ^J,...,~ :,w
· ... ···t···: ···t··~···: ···1···Y···}··~···Y····~···r···~···i···+··f···r··~···1····j···1···t···f···t····j···Y'··t···j····r··i···Y···r...j.... ""j"'Y"'f'" ""' - : .. ..++~ ~"'I'+" ...
· W v~ tw^"'~rA'-(.".v"J'~V"^t~-E--~l·w~f"^VA,.:--~~'~'~'''~''Ar'A:--",~~--:~""",,,,,;-wIY ..;...'''~''....;-''Ar''~'~Ar^'t'''>''1"'''~m'I'''-;·'^V- "1'" ~v---. .... ~>W'i'A "NY"'W
· ·+"E"1---t'+---~lWf,,^: '~m "1-^t~+--+^lLwt"t+-4^+ll...~,.: ·"tl N++^Tvrl"l w~i'+^i -++" w, ¡^+ ++^ ,... m:,,} ¡: .
-1 0000 f ....·~lI~r~J·1···;..· r··,:¡::¡"·r·r" , ·..rTJ··~···r·..¡···i·T::i·..!·..'T·r·..lP=rf~LW~~....· ~~~'r: . +^'+' .....
¡.Ii ¡':~¡: :,~H:i¡::::¡:;¡:<¡I<:l:: .:
~ . ....""'~........ ...~... ~.........:..... v ~ '" .H~~...-'O-.............."*""'....[..oo...o)...t·..'..í...~...~........,.....~..-.Qnov......... ,..oon. .".,. .~ .n.
-..^.LLLJ....é,^:..J^l-L ~..^L,L,L,.L"Lj,J- "AL,~....,L,Lt_Ltl j"L'l ,jm,~"twL, miftt~ J~v ~$E¡ tL '. - "AL ^,"¡,wà--- ".
¡ : i T ¡ ! ¡ ~ ¡ ¡ ¡ : ¡ i ¡ ¡ ~ ¡ j ¡ : ¡ ¡ ~ ~ ¡ :. ~ 'i ¡ ¡ ¡ J..! ¡: 1
w.<.^"'''''~'''"*,"",,,,,,,,,V^,.oo~ .WO)"OWM-.....w~......y~*.....,.:.,."..".,'u .'TVN ~ ."..<v"H.......v....~......^~""""'^.....~ ",,.:-. .....y, .., . ~N''''' ...
: : !: :1:: ::! :~~:~: \ ::,: ~: : ,<:' ::< :
-11 000 j:~'*..... W "r...~V^' ^" "'~'w:-"'t^""'":""^'1^ . ~'" ",vr-w. '''~''''':"''^*^ "~'~.........'*"l W:'wm· wtl1[3IJ~~' ,,"'; . w ;,..., ^.
: 1 ; ¡ ! ::.: ¡ : 1: :: I:: : ¡ ~: :;rolo. I:: ~:
· "",*,,""""'¡""'t . ·.."'···:···.,:·...~·..~·..t..,~..· ....:... ...<Co..·~·..l....~...oo·· ...~....~....,...oo... ...~....á-..~ ..,.. oo\o~...! ...T·~·~ ~ ~
- y"L "'A' "H,,^L). ",L~mL~ ,)"l~lj......h, ~ l..-Ll ,+ ~ 1 ~)..,L~w.-1..~~wt-.L~,,~ ¡ ^,t....L..~^,L^~~LL y w·t;^ n.,~^Y W V"
:± =t.1.·~~~f~..~j'± ..t.tÞ...; ...U.n.L~t~t~Fi~n.t~f.uL¡.,;~tiJjjttlf.!,~~~t~~~~ uu ~I. .~~
-1 2000 i..t..·~· 1 1 c i ~ ¡ ¡ ¡ ! f ¡ ~ ¡ ~ ¡ ¡ ¡ ¡ ; ¡ : ¡ ~ ¡ ~ ¡ l ~ ¡ ~ ; : -r-t· . ¡ !
8 9 10 11 12 13 14 15 16 17 18
EQUIVALENT MUD WEIGHT (LB/GAL)
)
)
ARca Alaska~ Inc.
Recommended Mud P~og~am
(Colville Explo~ation)
FE~bt~ ua. t~ y 6, .1.994
~ene~~l Well Pla~: This ~ell w~ll be d~illed 0s st~aig~t hole with a final
8 l/~ hole sectIon to a rD at 7.1.40' as JurassIc ObjectIve test. The well
desi9n fot· t.his t.est. will I::H? t.he ~:\t.andat~d 12 .1/4" ~::\urfacE~ holE~ wit.h 13' 5/::1"
casing wit.h i:ln f:: .1/~:~" holE~ t.hen drillE~d to -fD_ A st.andan::lKupanJk t.ype
fr'esh wa tet- spud mud wi 11 be:? used to t.he 9 5/:::" casing poin ts at 2100'_
From there to TD at @7140', a fresh water Bland Mud will be used.
TV () rJ1 ¡J
TMD
120'
/800
7800
Casing Pt-ogram:
Hole-? ~:)i ZE~
Casing Size
Conductor
/J.3¡{g ,.
7"
10, '{oo
20"
¡(P"
:31/2"
I. Surface Hole:
1&'."
Hole to (~! /800" -~ /0 .3/9
Casing)
1.) Treat out the excess calcium in the make up water with Soda Ash mix
adequate spud mud surface volume with Aquagel/X-Tend II to a funnel
viscosity of 80 - 120 sec/qt with a YP of 25 to 35. Add caustic soda to
adjust the pH to the 9 to 9.5 range for maximum bentonite yield.
Maintain the viscosity at initial levels to the base of the permafrost
(800'-1000') then reduce the viscosity as allowed based upon actual hole
cleaning requirements. A funnel viscosity of 50 - 80 sec/qt may be
suit.able by t.he 12 1/4" TD. It. should be noted that. t.he act.ual mud
viscosit.y requirements will vary in this area based upon the actual amount
of surface gravel present at each specific location. However, generally
only minimum gravel has been noted in this area allowing successful
drilling with reduced viscosit.ies.
2.) Due to concerns for gas below the permafrost., spud the well with a
9.0-9.5 ppg mud weight and then increase to 10.0 ppg by t.he base of- the
permafrost (800'-1000'). From there to the 12 1/4'1 TD, hold the mud weight
at 10.0 ppg or as dictated by actual well conditions.
3.) PAC treatments can be initiated toward the 12 1/4" TO for improved
well bore stabilization by reducing the API filtrate to 8-10 cc's.
4.) Circulat.e and shot~t. t.t-ip t.he hole pt-iot- to nJnning the '7' 5/811 casing.
A light Desco-CF t.reatment will be useful t.o reduce the gel strengths of
the mud prior to running t.he casing and cementing. Note: There should be
adequate chemical treatment of t.he mud to insure rheological stabilization
of the syst.em prior to TOH to run the surface casing.
As the cement contamination while drilling out of the surface casing on
Alpine #1 created a significant problems, extra focus should be made to
insure this does not re-occure. Condition the mud as well as possible
prior to TOH to run the surface casing. While NU-BOP, condition the
surface system to reduce the reactive solids content and pre-treat with
bicarb and thinners as allowed (pilot test f/specific treatments). When
REGEIVED
Page - 1
FEB 1 3 1995
Alaska au & Gas Cons. CommIssion
" n r. h ('IF ;"
)
)
drilling out, continue with bicarb treatments to remove the excess calcium,
add PH6 (citric acid) as required to neutralize the pH and treat with
thinners as needed for rheological stabilization_
5.) Maximum utilization of solids control equipment is recommended
throughout surface ~)ole drilling operations to keep the sand content less
t:.han .l~?{; by volume and improv(~ Ov(·?t"all dt"il.l.i.nq condition:::.;.
..... - -- - -- - -- - - -- -- ---- --- -.- - -.. - -- - -- ------- --- --rvïJ ---- -- -- ----- - -... '-00 -... --- -- ---. - - - - ---- --.- ----.
.II. :;:: 1/~~:" Hol(~ ft"om /33(8 " ~3hoe t:.o (i~67DD' (Top ZonE~ of lnt;;(~t"est):
1.> Thoroughly clean the mixing pits and all surface equipment and mud-up
adequate volume (@750 bbls) of new fresh water Bland Mud for drilling ahead
in t.h(~ ::::: 1/2" hole. The mud ~:::;hould be fOt"mulated a:::; indicat.ed below
assuming a 10.0 ppg drill-out mud density:
1 - Bat" n·?.l
Wa te t"
Aquagf.~l
X-T(-:?nd II
PAC....·R
P AC"-L
Bat-aid
Aldacide-G
Formulat.ion
. :::79
6.0
.03
.75
.75
102.0
.2
bbls
ppb
ppb
ppb
ppb
ppb
ppb
The important initial properties for the initial 8 1/2" hole would include
a neutral pH in the 8.0 to 9.0 range, YP in the 10-15 Ibs/lOO SF range and
an API filtrate in the 6-8 cc range. The initial funnel viscosity should
be in the 40 to 50 sec/qt range or as dictated by actual well bore
condit.ions.
The initial mud weight. t"equirements (currently designat.ed for a 10.0 ppg
drill-out mud density) will be achieved with barite. (Note: No calcium
carbonate is programmed for use in this well.) As drilling begins in the 8
.1/2" hole, t.he mud weight should be increased on an as needed basis with
bat-it.e. The maximum mud weight. fot- t.he I:: 1/2" hole should be in~· the 10.0 -
.11.0 ppg range.
To reduce or control the mud weight while drilling ahead, maximize the
solids control equipment. efficiency and dilute with fresh water as
required_ Some rig site solids analysis will be required to identify the
best. mechanism for overall solids control.
As this system will be run as a Bland Mud throughout this interval of the
well, only fresh water, gel, barite and PAC's should be added to the
system. Additions of any other material will require authorization from
the operators representative.
2.) To, avoid excessive cement contaminat.ion to the new mud while drilling
out of the 9 5/8" surface casing, it is suggested to clean-out the casing
and r'at hole and dt-ill 10' of new hole wit.h a "watered" back spud mud ft-om
the preceding interval of the well. The new mud can t.hen be displaced into
the well after running the LOT and prior to the initial drilling
operations. Again~ refere to the previous comments concerning the
problems which were exper ienced on the Apline #1 RrCI I Vto efforts
Page -- ~~
FEB 1 3 1995
Alaska OU & Gas Cons. Commission
Anchora . .,~
)
')
should be made to m1n1mize the problems associated with this phase of the
drilling operation.
~~) _ ) T' he v :i. S c 0 :-:'~ i t. y 0 'f t:, h E~ mud .i n t:. h E~ ::::: .1. / ~:~ II h ole can b (.~ ~:; u s t a .i. n (~d wit h
"'f (::I (:11' 1- I' [) I~ ''', (- f A ·111 ,- ., -1 1 ... I-·J ("1 V 1- (-1 r ,:I (""1 t" ,- r :I / (-) ~.. f" A('" 'I-~" ,::;¡ ,- 't ro(::'1 " '1- .- X - 1- v, ' 1
<~ ..' I ~:' J ' C .. d ~::'I L , <::1 I U .~, ,"\ ,,'~, I C ,.~. d I ( _ I .. J ..' ":, <:1, ::.. I ,,~.~, _ . d I .1 sea n a. so
be used to provide good LSRV support on an as needed basis if approved by
the operator's representative_ These viscosity treatments should be based
upon actual hole cleaning requirements_
4_) Maximize all solids control efforts. Run as fine as screens possible
on the shale shakers_ Do not run the desander or desilter as the valuable
liquid phase and calcium carbonate will be lost. Run the mud cleaner with
fine screens from the beginning of this interval_ The centrifuge can be
used to cut the mud weight from time to time, however, rig site solids
analysis will be required for specific application.
5.) Treatments with PAC polymers should be used throughout this section of
the hole to control the API filtrate in the 6 to 8 cc range or as required
based upon actual well bore conditions_ Low viscosity or regular viscosity
PAC products are available for use.
b.) With the operator's approvaly control excessive rheological conditions
with additional Therma-Thin treatments on an as needed basis_ Therma-Thin
is an effective polymer deflocculant designed to provide effective
rheological stabilization. By maintaining a .25-.5 ppb concentration of
Therma-Thin in all make-up additions, better rheological stability will be
obset·ved.
7_) The commercial bentonite (Aqua gel) concentration should be kept at 4 -
8 ppb minimum through this intermediate section of hole.
8.) Dilute as necessary and maintain volume with fresh water as required.
9.) Maintain the pH in the 8.0 - 9.0 range. No caustic additions should
be made to this Bland Mud.
10.) Continue with tourly treatments of Aldicide-G while drilling this
interval of the well. A 5-10 gal/tour treatment rate has proven effect in
recent North Slope work_
---------------------------------------------------------------------------
íl./¿) rC/éJ
I I I . :::: 1 / 2 II H ole f / (!~ 67 {J 0' toT 0 ( (~~ 7800 ):
1.) Prior to drilling below 6500', the mud should be conditioned as
follows to insure mud stability and to t"educe the API filtrate for pay-zone
protection. One should expect a minimum dilution of 10-15% with fresh
water to re-adjust total solids and to make the system receptive to the
Following treatments:
A_ Continue t.o t"I..tn th(?' pH in the neut.t"al t"ange of ::::.0-19.0. Thet~e should
be no caustic additions to this mud.
B. The API filtrate should be reduced to the 4-5 cc range with Dextrid and
PAC' ~::; a t. a 3 : .1 t" a t.io. Th is wi 11 Pt~obabl y requirR rctf\rt fjl y 2-3 ppt>
FEB 1 3 1995
Page - :.5
Ali1ska OU & Gas Cons. Commission
Anchora, .,~
)
~)
Dextrid LT and .6-1 ppb PAC-L. Baranex (a modified lignin) may be
considered for use to i.ffiPt"OVe the filtrate control mechanism. Confirm with
the operator's representative for use of the Baranex additive.
c. Be aggressive with biocide (Aldacide-G) treatments to reduce/minimize
bacterial degradation. A field kit is available to monitor the residual
biocide concentration.
D. Continue with fresh water dilution as required.
E. Adjust the mud weight as required with Baroid (barite). Again,
anticipated mud weights for this interval of the well is between 10.0 and
1.1.0 ppg.
2.) To control excessive rheology, treat as required with Therma-Thin (a
polymer deflocculant) and/or Desco CF (tannin powder). Confirm
authorization for use of these material with the operator's representative.
4.) At TD (after the final core has been cut)~ conditioned for logs and
possibly a 7" casing job. primat-y focus should be on. rheological
stabilization with caustic treatments to for pH control and Desco-CF,
Therma-Thin and/or Enviro-Thin thinners to control excessive rheological
t.rends.
.---------------------------------------------------------------------------
IV. Suggested Mud Propert.ies:
Uppet- Lowet-
Surf. S 1/2" 13 1/2"
Densit.y 9. D,-I (] . 0 10.0 10.D-1.l.D
PV 15-~~5 .10-25 20
yp 15-35 10-20 .15
Viscosit.y (Initial) E10-120 40-50 45
(Final) 50-E10
Ini. Gel 5-15 3-6 3
10 min. Gel 15-35 6-10 9
API Fil. (Initial) 10-20 6-8 <5
(Final) ::::-1.0
pH 9-9.5 EI . 0-9 . 0 ::1.0-9.0
%Solids 4-1D <6% LGDS <6% LGDS
----------------------------------------------------------------------------
RECEIVED
FEB 1 3 1995
A,\aska ou & Gas Cons. Commission
Anchoré. .",
Page - 4
')
)
POOL ARCTIC ALASKA
RIG #6
DRilliNG FLUID SYSTEM
RECEIVED
FEB 1 3 1995
A \;jska Oil & Gas Cons. Commission
Anchoré-
'>
'b
.'
""f"
I
I
'-I
-'
.-¡
.....,
-(\J
I
C'\J ~
\.f)
RE(E\VED
fE8 1 3 1995
A.\aska 01\ & Gas Cons. CommisSion
AnchorE .-
-
)
; , J / t I I U.\; I , , , .
MUD í f -T--~
DOCK I I
I
m¡m
rn II!!
1M) HCJIPERS
rn
I r
~- rlilri
~= W¡W
~-~~
I
- I
I
I
~ ¡~
I
I
~ 11-____
/
-----..
~
JQ
J~ }_'-
; L !~ï;·
~.~ ~~,j
.....n- I r---
Å I:
---r-. ! ~H' It",- !
I ì(]....¡...,¡ IUI~! ~'
I ,..,...., -. 0 ~_<: ,
~ ! ~__ 0
~ -r'.nL "..I :
DEJ:.MSER I
I......!.- -
~ :..' ~ I ~ r _:: -:-:ï..' "\
~- - .--~ I ["- - ",-.-=1
- - I DBRaRS
.)" k ~ " ~ ¡ ,.
I
"
" I ~
[lllllIlIllIll
\./ -
I
HI µ" "
7- tff 'j(
i ~r ~~
~ L a::-
:31 ~II-
o -:z:
o lLJ _
a.: . I -(..)
~ - -
lit -51
: =~I=
::¡; c
- a (.) -
¡;:a c - ~ a::1-
r L t===:~ - ~ - ~ I-
I ~ _ (I') I ~_
¡j [~ i
~ - I
~ -- I
-- ."
oJ,,! 1... = "" I I ~ " if
1.11 rlt---!!I ~ - I
I
~ r:;tr" åI" ,....
---111I f .11I -.:- I-iii
I ~ '
m ~I
I >-
~l ! ,
- II
.,
Ii
"-. r I
I~[ I
_ -0 ~ ¡ 0 J
~; ~ I
~ ~ III
--' - I
= [ I I
OllWElL \
V . E-2000 ~
~ DRAWWORKS
-= ~ I Rt' 'II I
- @"Z I
J 0 ç CII.EL~
-(/1 ~'
;..-- ~ ---- æ
/ ëE ~ ~ ¡
_ a '~
=f~ i
- I
~ .... .
I I
I
\
I
I
I
=&
1
:1,
I
l_
o
\..
~"
~
"'-
~
!)f
~
d
FEB 1 3 1995
Alaska OU & Gas Cons. Commission
A, . ~ .."
\ I'
t::
ã5C1.
CJJL&.I
a~
to....
-~
/ \
~~ !! !j
.' . /
\ 1\ j\ '
[1j I ~ " /
~~ ~~ \ ~
à-... ¿. ~ -..J L¿J
::) ~ :::) L&.I ~ §
~ C» ~ C» u:.
m~ ~~ ~~
Q 10 1(.) I~
/ \ /~ \ I rm',,';;.
~: ~~ 0 !\ ~ \
, . - /
~~
œ ~ ! :......
I ~;-.; ~~
- .....-
=- ~ j
- U.I --/~ \
- ~ S
] ~ \1 ~
T( r ~ : Iii /
I... ~ / II \ I §I
-+~~----~ _.J-\-;;\:L
~ = ~V
== [JQ ~
:.: \
n8'1t. :.: \
I LJa&I ~ - \,
f n ~ þ
RECŒ\VÈD
~
I
./
~
n
. jI
1t
III I
01 LWELL
A-1700PT
III \
II
II II
OIlWELL
A-1700PT
II I \
~
/
~
III
--~
- :a c:
"
t~ ~
~
""
..
~r/
am
a-¡
P-J
~
/
WA51E'
tW:1JDN
fUP
a=- S
¡~
c
aD
au
m
r'I
'"
(!,-
\
t::
a..
;j
~
....
OJ
OJ
~
-
! \
t=
a..
z:
o
Ô
:::I
V)
~
Cl:I
Cl:I
~
\)
\
I
J
I
/
7'-4-
I
I
')
')
PRESSURE ANALYSIS
ALPINE #1A
(Per 20 AAC 25.005(c)(7), as required in 20 AAC 25.033(e»
RECEIVED
FEB 1 3 1995
A\aska OU & Gas Cons. Commission
Anchor" .,
)
')
ARCO ALPINE #1 A
ANTICIPATED PORE PRESSURE, MUD WEIGHT,
AND FRACTURE GRADIENT
o .! . ttl~ ~j'hl·..L.. "'i¡-' ~.L~L,.t-Ll~L-~~L·L.1Ll"'~^Wl"J"{t,,.LJ'1"·i..J...L. ¡ ¡ ~^,L, ~ LL"
:, t: : :~:~:t:: :~:: :1 $: : >: : :
.' )'n.. n .,,~.... ...... w.<_... "". n.. n~~Æ-...<-...r...~...<-... ."<_",~.."",x~,.~,......~",_~",, ....~,,~... ... ....~...~.... ^'oC>-->>>-'^ . .. n~ .",~...
-+1-- °l--..L -- ~l-,~ _.i....L.+-; ,;, ; ,
.+...¡.... . +... ..+.. ..+.. ....... ...t..+··t·,+··~~t-l..·t"+"f·..t"'i·..++·..t+.. ..+..t~t+". u+-+.. .... ¡ ¡ ~~;; .......+..
-1 000 ~ FoÆ ..~. ,,¡..... ...¡... ...-\0....... ... ...~.v-\o.n~..+...$...~...~...~....:...J...t .... ....~..A:..A~.~~nA ..A"'...~...I..~... ...y...~... ... ... ..·t·..;·.. ....t.. . ~
~ PRÉSSURE . ;'''' vi", w+"'-- .^' ~ ~,,~ : ~t -lit: ,,~"--!~ L~_ w~"Jv-r!"'{"" -¡---l"t+- ^ ¡ d:llNE LOT 14.~ ~ ~~ ~
: ~ :.: :: :: ~j: 1j: :: : F: $: t : ¡:
SURFACE . i ~ : ··t·: ¡ r" ... ., ^'. "~r^r-- "'r"'~'" ... 'ht"'T' "T"r : >'T"'}"T" M "rl"1 ¡ ¡ ...... ~-r-"(' ¡ 'lw.o
CASING ~~. AW>-W.4:W^l-~'''''A~~W .~ W ~Aw.....<", 1~Awn -~r"'~'~r" A~h~~'¡' ~~r"""¡"""" ~ ^^^^"1~
1 7 6 5' -~..+.. ..+.: ; ¡tJ; ...f...·.. .... ... ..++.... ...l"·f~ ·+·t·..i··"i"-~·..~·~+..·j··~v ..+·..~..·~...t·~ ..j.". ...l..t"""'r·+...~...t... ...++.. ... ...~...~...
-2000 +.J- ....,... --¡-.-, ++ - t-'- - ,- -rr""'~A....~n+nfn . ^,.')'v+~{-.v.+....~v.... ....+·+·4.............+.....~·+·" .......t'....~VA~...... ...4....+·"
.¡ '..' :~: :>+: ::': tt:J.: ':...J:: \: ~:J: >1.
M"rWr~ 'wiv . ~~-~'" ---,. i T-r ""1"T :.! VTW "'TwrTVT '" ^r-("T"l "r':....--cT"rrwl"'l -r:rT'''r~r'
,... " : O' ~.. ,. (' . "(....., ... ·t·r--r.¡...r.t··¡··;··¡·lt·¡····... ···r+·¡--- ¡ ...,·t~õtiiib:údöA TA ~··t··...
.w " ~ .. ~r ¡ n .... AT~~- ~1 ~riY-r"'I~"'¡ ·T·...t...yTm-iAyTA ·t¡~+~' . ...~t'YT-rty A ¡ ¡ ~ª: :
....>.... .... ..."'...:.... ... ... ..."(0........... ...~...~...oQo... ··i...~·.. "'oQo...,),...>...oQo..J...~..,., "'1'''~'' , ,. ...~. ~._~..."... ... ....s..... ....>... ...~....~~-rlovn
¡ :: : :~:¡$: :¡¡: : :~:: ~: ~ ¡::
- 3 0 0 0, .....'!'-..... . +....'t·......¡.......w~t......¡........r......;........y."~......-;....·l : ..... -"'¡"""Ar A.....¡.....Ar ~A"'" . ,,~.w..c..... '" . v... "..~... ..... ::......¡.....:..... .~
,w~~~__ " ~~L.... ~~~ w~ '''1wL.iwLlv_i'''I~'wL'('....¡Wi~vi'~~- r-i-...- v_""..L,l-...-L" ~ "" mil i: ,,- .~, h.t ~ : ___L_
: ¡ .:: i MUD WEIGHT: r : : ¡ ~: ¡: ¡ ~: ~ ::
-M.. ··.···.··C··· .. ·1·'lt·':Ln:··'··t·· "t..T..~-r-T..t..·:...· ·..t·.. ··TJ....~·..·, ~ ,n . m..v( n v,-+~..
o -t...L ...i.~..¡.. ...1.. ::t - i 1.l..fiT. ~ .±t.r=b¡c~tt~ ±~ ....t~¡~1.....t... ["..:::........ ::~ .~~t "'''. ::t:: .::
-4000 ~; : .~~: '~'twT~': ~L...¡" ~ ¡ Vf:~'T"Effi' L~I' WAI:~~t~+...t- ~A; ~ ¡ ~ '+[fvt1W~i :, ¡ ¡ :: :
I~~ I'· - "'w..."'~~~ -~'" ".. '" ~""1""'<"W""" "" " "" "'''~ ~:r...w, '~~"V]"~ ~_Lv
: ¡: :: ...¡ _ __ r: ¡ ¡ : : : : I : ~ : : '.: : : ¡ : ¡ ¡ : ¡ ¡
-... ... ... ...~...<... ....;... ¡ .; > oQo ~ ' .. .....~....;...oQo... .... ........¡o... .... ...~....>...oQo>.v. .
! !: ! ¡ ~ : ¡ ~ ¡ !! ¡ ~ ¡ ¡ , ¡ ¡ ¡J ¡ : ~ ¡ ¡: f ¡ ¡ ¡ i ¡. ¡ . t~
"'~"lw.~.'w 'w~'''''''I'''~'~~r.-^ _A~V'" I~ "''I''''....v~,i..w''"''"....... '" "'o.o""~_~" v........~,)o--v ~~ ~-"~voQo~f'""...,,>-' "">.......... ".."w ~-
::I: : : ~: :: :: :¡{:~ :!¡:' ::'.: ¡::~L: :¡:: :1: :~: :
5~~~~1~t~~1gª1~I
C _m~....~....~...~... 4¡ ~ i.... ....r..·~·..L·f: .. ~r...~.~¡mr~¡...f)..·L.i...~....¡:~í·..~·..¡···~···t···~..,..·..¡"'1"'~"'~" ...):...... ...j.... ....i..· VA ..).... ......
_..,LJ",,· v~t,,~..,,~--~-~L_'¡"'''~hL,,y...J···l:''' ~. ..vt··l"...L..~,,¡Lv "L-1^Vl~L-wL",i,w¡~t...vrL~~~t·wl..-L """ ~>: :... .. :^,,¡...
ß -+,,: )-r ¡ ~.+.+..,~.+..+..+..... ..+ut·+·+~I..":·..) ..·¡·..t"+·++··r·+··t·,,t·+··~rt+i~·:..·t^·r+" m r-'
a: -6000 -t -tn.4:-~~..(~~;n'1'~h~A:~~...n;'~ '>At~A'¡'~A"'_~'~oQo'~ ~~.¡..w...~,.........~>A~w.*'yA~y..<~....¡.....J~.4,~....A~f~....:-..n}~,4-~:......-}·.';'.n}A~~~";" .., ~~..." ">A~m ..,
- ...J... ... ... :.._~...l....:..J.J..~...l...lj...L..,;,Ij...t...L..,...LLL..L.L1...t..l...L.LJ._Lþ < ; ; .l. fwictUREGRADIENT '
~ -: ;:: v+--4+i: .+..+... vff·~+-..~·~....¡m.jL+n~A.~~,.i..t>Ai-mi.~L+~~+.. m.~.... n' ...~v r'''~ ~I' in ; >A" A' VA'
<C . '"'}''' w v_}_-t-~~h"\"V->,w~-""~"",,,""o'>~->""~"r"'":' ".g."'~-"'1"" w^l-"+v...r"...¡....-.~...,1"~'":ll"~vT --~" 'w J..L rvt'" w ~ ,,- , 'w~"" -~.
~ -7000: ~; ¡-j:~I:-ft:ii: td+=ttL+tdil±trtJ 1,,:,::.C:L ::::::. :i= ~
-~ ~. v.. ~ ~~¡ t' :"E~ ~ ;! 4H···~·"l...t"l· t ¡ ! t It ¡ ~ t-.~- ; ¡ ¡ >on .n~ m t ¡ m1@
o "r ... ....+. ... ... ..+.. ..., ·--;-..¡..j"""¡··-t---t..."·T·"·..·...t·"-··· ...0...·····.."·...··4.. ...,..... - ....... ... - -
-8000 -Itq1t~¿tt*_t~t±tJ*µttt-'±tttí ~¡ttto.+;=:...
W+V... ...+vr~t:v...+·...Iw~....1¡".... ~+.+~~......+...... "1+ -+v...~.J.+'+A+v+++A+L...+·±i_, ; ~; ~ ¡' Lttf"ï
--~ ~- ~: "1 v.-.t~..¡...", J'^'~~'" '" ",J·..~:.."t-1"'~....¡...........)_....:""~'w!,,':..._^ív.....:w....¡.'W~"..:.A"'S At--- w....." v__,_ "~~<--'¡"'~'r-w , : . ~ -4.--~
:: ;: : .í::~¡~~: ::~¡~~ ~¡¡ ¡: ¡ ~ ::
- ... ...~.... ...~...-E"..¡..... 'V~"'-E"'''' ' : ·"oQo·";"'r",¡v'i"..Æ-...;... ....¡...o(o..J....~....~.n'$... ~......¡....~....... '''ì'''l'''~v, .... . n~
-9000 ¡ ~y...~l_<_",l~~~~....+.wL ~.Jm1 ~ ~~_...L-ly-~.....L...,~J~i"..w--~J :-...1....... y _...¡.~ ~~~.)'" ...~ : ¡ :
¡: 1: ¡ ~ : ¡ : : :: ~: [: ' : : ¡ : : : : : : ~:: .: : ¡
: ~ l~Vr~J~l~oQoIL~+~'IL~F1=r~T' ¡ ·J~if·~~t+l~~F~·IL1~+~F+~F~L[: ¡ '~r~ - +~~ '~;~:L~ :: ~n. ~ ¡ ~ : ; ~
. w_ - -~ -- ~- ~v .....~'i"~"" _^L, ~~"".::.........¡...~+"m"· ,~ "'-:--·~··{."oQo·"l m~m_m.'..."''''1''''~''' ...,~ :t--. ·..1· . ... _~....".v
~ ¡....... ...I....... ... ....>.nl....L..¡..ffi·L.: ...t..L.~....~... ...y...lmL.LL.~m.lmLmL.l... ..·ì...L·· ¡ ~. ". ...).~ ~L..
~ : ~.:~: ¡:~¡ (:¡¡:¡::::r~¡: : ¡ ~:~¡
-10000' - >~A-.:_""""""4""...:~~ w..yn"¡"""" ~4~~.........~w-'l""'~'~} ( ~ ~ . -:¡;--:........ - ~ .-- "'>~
-. ~:m" ~ ; ~" : ~~+~~: ...r·...+·l·l..: ...I~ "+"rt t ! t ¡ nL: "¡Vt7-J~'" ~ ·,,1·..t"T·i· n.. ~n1" ¡M +...
_.~.. ~ .". --~'wr ......-:---~^I-"^""':-'~ - _......,.."'W'..."..¡.A" '~'~"_'W"~~4,_.y.W4·...,.,~.i-. {.i~~·~m .~""""~>A,t~·....·. - ,>A . .-n_~·w wi'~
_.~ ~- ~ ~f_ '~'0-,vm: < ...Lv~...l",L"l._l"lw~L "',L"hL..lwh_iw~..,...:"Jm¿~~...í...L~~.í~vL -1--- : µ~ : w --~~
~ ~: t\ :..:: ~ : t ~ : ~ : ~ ~ : .t___J : ~ : ~ ~ : Ü) : ~ ~ L,...:- ::: ::.. ~
... .... ....... ... ... .............. ... .........~... ..·~..Ì·..oQo...! .....~~...~...oQo^'..^'.......~.v{'·--~·..··..i···oQo..·~..·~...·... ..... ··"'1C'"90·.¡.·...·..·oQo... ......... .... '"oQo''' .....--.~....~....
-11 000 ~ ,~,Lt: "'......~ Vi: ~J u _L ~L",-.L,L1t"L.Lvtv_L,L,¡ ...vLw"L...¡·.aa..-r . vL . t1 - ¡ ¡ : ^v. ~Lj..._ ¡ ,,,,~,~J.,,,
~ L:} r ¡ ! ~ ~ ~ ¡ ¡ ¡ ¡ ! ¡: :"r ~: ¡ ¡ : L ¡ ~ :
. ",~",L~ -~~ tL.t~þj~~~ "'r' '~Il'" "~CILC·j·1~~:~I~I~.CI~~~:~~~:~·;:r~i~~~·~õr·:· ït.ïjj~.J"l^-" ..Tl..... ~
i \! ~ ~ : : ¡ ~: ¡ í ¡: : ~'Q~:.T1nJ. : ~ : ¡ ::: ~: :
..." -f""""( ......., ~,..:o.,w'^' ~"",¡".....,.............. ~n:nnr·nr" ~Mr~"" ~- ~."-o.--~"'''-~'''-O->~ -~ ...v., ~--
-12000 -... ..t.., u¡'- u. j'+', "'¡"-1-" ..·t·.. ....¡.... ..t+·tu-¡··T..·!..t++·++·t..+..j·...t"trr·¡..·t .;: ¡ ': . i
8 9 10 11 12 13 14 15 16 17 18
EQUIVALENT MUD WEIGHT (LB/GAL)
)
)
ALPINE #1 A
INTERVAL TRANSIT TIME VS DEPTH
SP 1360 WKE 92-02
o ~ : l :11: I t :: ~ ¡
i ¡ !! ¡ ': ¡ ¡
~===~=- -- =-=;==r=r=,=P===r== -=--------r==:~q==
, : . , : ! . ¡ ¡ ¡ ,
, , :' , ' . ¡, < . I
-....................----......... ·---------=r--------T-------T-------r----- . J~ m..~r--------------------- · --r--'---------- --------ri.: ········..1....... ,w"I"~J m'
-.~~~~''''''''''~-~ "w_~"w~""" '~_W-[""'i~-'lw -" -- ""''''~~,~'w.,.''w~'''''v_~ 'w~"''''-+-~-:-_,~..,_::''~,~ "', 'w [~'
!: : ¡: ¡ <
-.y....~ ~A''^^''''''''~......,,~1-~ ....~...... ~,~.~........ "....,,~,.;..y.y~v..l..y...v~......~.... .....,......w~.....~w.......~-. ......t.~v...........~vv ~w.~v.y..>.....w......L.y....v~ ...~ ~V¡~_
< : : : : : : : ; ! ¡ 1: l
-3000 ~:===+==++~t~t+tc~--r=+=q=.:-lt
:I: ------------------ -------,---------¡-------~.------¡ ----t-·--j--L_-----------u--u---r--u---+-u-------t--t- u____'uu_,_____, u_
....
~ -~ =_u u___u_u_uUu------ uu--¡±t~===r=u-u i=tu---+=T=I~=~.!----¡~~
- f ¡ I " , I", ¡
~ ~ooo :¡~~t~.;~I~
¡ _, - I I, _, -, , _
-8000 ---.-- ------.---- -.----- -1·lt1~--r------------t_------ , T ft'fEÞt---r!---
10 100 5 1000
INTERVAL TRANSIT TIME MS/FT fE8 '\"3 199
O'l~ & Gas Cons. Commission
A.\as\<.a
Anchor~ '
-
...J
...J
W
~
...J
<C
Z
o
I-
U
W
a:
c
'-'"
J:
l-
n.
w
c
c
w
a:
:J
en
<C
w
:æE
)
)
ALPINE #1A
INTERVAL TRANSIT TIME VS DEPTH
SP 1360 WKE 9202
o 1 t tIt l! ; ¡ ¡ t' =H
~:=====. ==. ==:= ...::::. .= :::::. :::. .... ...====r=== ::::....·=r::::::::t::::::,= _.- ::
I ' ' ,f ' ~~ç: ¡ m
_=.==....: ==-..·t.~.::=t=· =t.·~= ~.=.L.'·t.·~ :'::::~_'~""~'..'=~ ·,~~~~.~~~~~~=.:~t~~~~~~:t~~~=t=~L.·.-: ....·1·..· _ ....
~ : ì :! '!:
. .. ............ .......... J ..-............ ... .~......t .........,. ....l...·~r.... r L .................. ..........·...·t.... -.... ........... 'f"~'" +.. +.. t"f ..·1·
¡ . i : ! ~ ¡ f : . ¡ :
-12000 1-~---!-·_-1 -ri--(-r¡!J~----T--r---: "I< t~tr-[UO
INTERVAL TRANSIT TIME MS/FT FEB 13 1995
Aiaska Oil & Gas Cons. Commission
Anchorc.
)
')
Per 20 AAC 25.005( c)(3):
DIAGRAM AND DESCRIPTION OF BOP
EQUIPMENT TO BE USED
(As required in 20 AAC 25.035(a)(1»
AND
INFORMATION ON MAXIMUM PRESSURES
(As required in 20 AAC 25.035(d)(2»
R·E~EIVED
FEB 1 3 1995
Alaska Oil & Gas Cons. Commission
Anchora 2
)
)
BOP SCHEMATIC
POOL RIG #6
ALPINE #1A
13-5/8", 10,000 PSI
4
'1 (
I I
I I
< 5 >
I I
I I
I I
< 6 >
I I
r I
--I~-~---U lr- ~ - r--'\ ~
1 2 1 1 8 1 0 9
~ "--/ - "--/ ---1l r- "--/ - "--J .-r-
I I
I
< 7 >
REC:EIVED
I I FEB 1 3 1995
Alaska Oil & Gas Cons. Commission
I I Anchom p
See listing of individual components on following page
Revised 1/31/95
)
)
BOP COMPONENTS
ALPINE #1A
POOL RIG #6
13-5/8, 10,000 PSI
Diverter System:
NOTE: DIVERTER NOT APPLICABLE TO SIDETRACK
1 . 21-1/4", 2000 psi WP, Hydril Type MSP annular preventer with companion flange
to diverter spool.
2. 21-1/4", 2000 psi WP diverter spool with one 16" outlet.
3. 16", 200 psi WP FNW knife valve with hydraulic actuator on diverter outlet.
BOP Stack:
4. 13-5/8", 5000 psi WP, Hydril Type GK annular preventer with companion flange to
bell nipple.
6.
Single 13-5/8" , 10,000 psi WP, Hydril type MPL ram blowout preventer fitted with pipe
rams.
Single 13-5/8" , 10,000 psi WP, Hydril type MPL ram blowout preventer fitted with blind
rams.
Single 13-5/8" , 10,000 psi WP, Hydril type MPL ram blowout preventer fitted with pipe
rams.
5.
7.
8. 13-5/8", 1 0,000 psi WP drilling spool with one 3"and one 4" 1 0,000 psi WP outlets
Choke Valves:
9. 4", 1 0,000 psi WP McEvoy Type E gate valve with hydraulic actuator
1 O. 4", 1 0,000 psi WP McEvoy Type E manual operated gate valve
REGEIVED
Kill Valve:
FEB 1 3 1995
1 1 .
3", 1 0,000 psi WP McEvoy Type E manually operated gate valve
12.
3", 1 0,000 psi WP McEvoy Type E gate valve with hydraulic actuator
Á\aska OU & Gas Cons. Commission
Anchora ..~
Revised 1/31/95
')
PROPOSED DRilliNG PROGRAM
ALPINE #1A
(Per 20 AAC 25.005(c)(10»
')
R tc.t\\JtÐ
rt.\) Î ~ '99S
comm\Ss\ot\
. \\ &. Gas Cons.
~\(}.s¥.a Ü AAcbot'.'
)
)
Alpine #1 A - General Procedure
Application for Permit to Drill
February 12, 1995
1) Dress off cement plug with 12-1/4" bit.
2) Test BOP if required.
3) Make up 8-1/2" bit and bottom hole assembly with steerable mud motor and
MWD/LWD (GR-Res). Drilll 8-1/2" hole to kickof point at ±1900'. Orient
motor and sidetrack out of original hole. Drill 8-1/2" hole to TO as per
directional plan.
4) If LWD log results are favorable, run and cement 7" casing.
5) Nipple down BOP, nipple up tubing head, nipple up and test BOP.
6) Run cased hole logs
7) Pressure test 7" casing to 3500 psi.
8) Freeze protect 13-3/8" x 7" annulus.
9) Run in hole with the completion type test string, space out and land tubing
hanger.
10) Nipple up and pressure test 5000 psi tree, tool string and manifold.
11) Perforate well under balance using tubing conveyed guns. Flow up the tubing
and through surface testing facilities. Test liquids will be stored in tanks on
location and pumped back into the reservoir or hauled back to Kuparuk and
processed through Kuparuk facilities. Gas will be flared. Testing will involve
alternating flow periods and shut-in periods. Individual intervals may be
tested separately or concurrently. For long term flow testing, the rig will be
moved off prior to perforating and will be moved to the Fiord #3 location.
12) Kill well. Freeze protect tubing and annulus. Install tubing plug and back
pressure valve. Well may be left with operations temporarily suspended and
long term flow testing may be resumed the following winter season
13) Clean and abandon location and access road.
RECH\lEt)
tEB ,~ '995
c mm\ss\on
. ~ u\\ & Gas conso. 0
~\c;.~\C.a. Anc"or~· .
DAYS
ALPINE #1 & #1 A
DRilliNG OPERATIONS
o 1: ~œ' ttJ' ~'U'!!ij~ :l!t::~ ::. ~ : 1:: : I::
---H.u~... ....~ '00 ....~.... ·w. .w "., ....Æ-...: roo .u.~u+." .,.~"";w ....~... u.~....Ltu.. .utmJu, m¡m m ,.. uuL. 'Jutu.L... '001.... ". ....L..l..~r·'....
-=t+1-.¡ -1' ,- .~ _:,-- - ~. _. .-LCj(~'1'~~I·-t ~.:j~ =f:¡t#: .# 1= ::: :. ::.:--:'rll~ ~L·:·:·tt .
- ~"~~~o}..,,y 'T'~~ ~- [W~~~I"~~~ W "w~" ~~1~ ~}u""""""1......,<,~"*,,j......~u...J..l ~." "..ov.....J...... ~,~'u ,~u ,,~...:,,^ ~^{.^" . ^,,^w^ ,,- ^"~~U"""II"
~¡ ¡ ¡ ¡ ¡ ~¡¡¡~:¡ ¡ ¡~ ~ : 1 ~: ¡¡
-1 000....:,,·(>·· ... ...(>~.. ... ..J ...(.... .... .... .... ..,,(....:..... ....<.... ...(..··~...·}....<·...a...··(·f· ..·1....<... .y. "H" .n'¡'.,. ... . ] ·n..;.....-.-.-.c~..;.....~ . ~
¡ : : : : ¡ ~ ¡ ¡ ¡ : ¡ ~ ¡ ¡ a 1 : ~ ¡: ¡ ¡ ¡
_^'.,,~u.....¡....,., ^ ,,^(>^ " I"-"<W "" ,w ,~, ;"~-..<_,,w.J:,,~,_ r~(U~"'''~}U,u'''''1'''''~' u",,~,~u ~ u ~,,~ rw...:-", (" ^"t.-^- ,^""~,,^__w..,,u,~ W "^'
$ ¡ ¡ ¡ : ¡ ¡ ¡ ! ¡ t ¡ . ¡ . ¡ ~ : ~ j! 1 ¡ j ¡ ¡ ¡
! : : ~' "'''!~l' ...........1....": ¡ ¡ ,P~U~W~L~BACKTO.S~R.FACECASINGAT1765' ¡: ...t""1~·-~i...··t ...~....
-........,.......·1...t······t·· ." ..'......l..-.-.:..--...~..--..-..¡---,.-..........-.i.-i."i-..--.....--.....-4-····t···[.. ...[...(>... "'r. ...(>... ... ...,....(>..J~..,.... '.... ..1...
-++... - ,+" ~...~ '... :u+~." -", ¡ .'w i '^~, +~+1~+-t-"H-~ .-+'1----!--,¡Linvt·ntn ,,~ +" --r~f"+~' U'~''^l"L~~,+wl'+''''
- 2 0 0 0'" ~.. .?,1..· ""? v'I~' ...... .~....¡....::... .., ·[ft, .."¡w,~....~.w~....:....¡",,oo. ....~...~... <: ..·t-,··- ¡.-..... ¡.,w--w_.-w--1-J.l._...l.t...~...... ...;........ ...;.-.. ¡....;....¡....
~: : !:~~ :~:!::¡:~: ::,...", . ,,'~ :¡ ::::
..........s. ; ; 'w ~^....t^""r : ;'1wf"'V~¡:.......rt"^t^~............~ 1- SI~~T~A?K WELL IN:8-1/2 ~OLE ;: ;;;;
. ....t...~~·.. .... ..nrm ....... ..+.., '''1 . ... ...·i...t·..l..t... .... ···t"'f...t"}·~"'f·"'j t...f·...1'..·fm+...1Y..'~.... ·...'..t...1W...' ."..~..+... ·..t..+.. ....r...· ..·t...t....
~'^t^,.", ¡ ......"""^ ^" W ...... ......-(>''''1-(>'''''~' ,,,.-w.,w,,,wui""~"~-' ."... ~^"...w.,(w...wu....",,,^,,,y_ "" WI''''''''''''' "V ^"V1^"
. ...+..~.... ...~....~... ....... .~+. ~m .n.i...t..·l..t.... ... ·...t..+Mt·~·LI~m.¡.n.¡ '...~n.~L..~...+...LJ[.......... ....~.......! i~ ~...... ¡ ...~
-3000 ~ '- ~ - -;- -- ï (...;... .' '.....L~ ~ L - - .'- - "C' i"''' . . ui",... .
: ¡ ¡ .' - :--- ~... "f+" ---j ~ ~ . , ~ ~^~~'^,..- ;: ·1~Ui^--+-i.- L"tu~ ~ ,,- W~ ....+... , <-~ w : "-+-. ,~ _w~~'"
-....t.. ...... :"4"~"", ··~·m·~.... .., ... ..+..~..l·+··~...·~..t·..l¡·..·f..·l'...·t j.....+..t.b+..¡.JL _.\..1-+1 ~ " '.
.. ." +'''. ~ . ~ ¡ . f· . ,~ .±t±LL· T L E I. .
_'^ ,.... ~~¡.w..:----r- w....:'w~.... .-...¡,,--,........¡...: I ^.... .'.....¡n",L+_..j." ",,¡.'^ _ .......~n~ ~_ n'-;_~~',^':"~ ~ R I 8 -1/2" D IRE C ION A H 0 L :: .
;: ::: :1> I:!~: :tt: .<¡: : :::~~ t-: f ¡
.... ......;,...... ""';"....-.0:-- ..,(>.... H ,..~.., .,,"'..,...,-.<(>....., "'000'''' ,.. ...:..-.... .."""...k..,...,,· . ~~~,........¿....~~..~ ......;...... ·m. >:ox .. """.
¡; 11 ¡ ~ ¡ ¡ ¡ ~ ! ¡ ~ ~ ¡ ¡ ¡ ¡ < ¡ ¡ ¡ ~ ¡ ¡¡ ¡ : ¡ ¡ ¡ ~ . ¡ ¡
-4000 ~- ........ ..£.--.__.l--.--....~................¡.. .. ~..._.... __~....--~. .......~~... nwj---.--l..t.. --. ---...-- -- ..--
.. +-j...t"·~"I"'·L. ...r·J¡ "+"1¡ ...~... ¡ ...l...~...L)...L.L.L.L.ll·.L.··ff ...l...L~L.L~L. L..~....¡¡ ....L.. ....1...l.. ....L..L..Œ;~~ 1"":["'" ,....
---t+ '+1---' _my-- ~ ;'- _ '+--+--HH+V 'j+ -H---l+F+-' --- ..ti ..t+-+--+---r---tt·+ ,---
::r: -é.--..-- ·--r--·..· .". ... ........, ....~..;...L ·--.;....t...;...·,..t..·;..· ....,... . +··..-r..;·..r·'.. ... ...L... .. ... .........--- ... ........ ...'........' ".;.-" ....;...!.....
I- ¡'; ,,;; ;¡";¡;l¡;¡; 1+¡; L ; ,,;; ,¡ ¡ ;;
. . .... .. - . . . . . ¡ . '. ,. . 1. .
. I ". . . .. . OJ I '. . I' ... .
a. -5000 w" ",o}w,<,'" "r",o}~",,"..,<.."..'n Un"W .u._nt'''~''."y... "~vnv,,u ~u.(w. '.v vuo}v"ru...yn' w, YO -", '~'o}y, ,,,~'u...,.v,,~u~v,,(>w,(",, u u,~"" u L.. ....~''^ .^.'n..(....
: ): r:) ~: : :- ~: ~: ~ : ~ ::: ~ :. :': :::: : :: ¡
W.... ..."'...,."'...(>."'t..r...(>..·~···+..~....r..·;....L.·: ..'·..·~..1·..· .,.......,..,....,..." ..........."...l...J... ··..l..·..··..·t...·...I.·..·..· - ........;-~- .... ._,....L~...R=n..¡'V>
C ¡ ¡ ¡ ¡ 1 ¡ ! J ¡ ¡!: ¡ J L¡ ¡ 1 ¡ : . ¡ ¡ ¡ : : : 1 ¡ ¡ ¡ ¡ I ¡ ¡ ; ¡ : l ¡
~"~"-v;'n~ - V.......,.-.¡....."<.....-w{n~ n.......n~ n"r""t"^ .~ n~ '^~ ~. -"-wov.~"--(.......),-..n'''''''<'~....rn....''Tw\......... ~,,'}~,,<,....'}_w n"V;"''' _w ''^'}~1'''~ ~ 'u -.... ^" ,,,...~w
¡ : :: ~: :: ~ $ ¡ ¡ ¡ 1 : ¡ :. j ¡ ¡ ¡ ': :':: ¡ :
W :::: : : ¡ : \) : i!: ¡: : : ¡: L· :: : : : ¡
_·"oM W "^-:~" .V^1'w1 "..;".'^.¡....-l,:.v.-w^"~"'(>~^~~t^"..,,~· 'w~...." u...~...".(>u~ ,,~.w...Jl.v . ".".........o-,^, ,.~~".,..:...., ,,~ ~^:..^I~ ^_":..^,.s^,, '"1^''' W ^V" U^.¡.""r"""'u,~"w
a: ! ~. ~ ~ ~ ~ (~ : ~ ~ ~ =. ~ ~ .~ ~ ~ ~ ~ ~ ¡ r ~:
-6000 ....... ...1" ... ... ...(>....... ·..~...·t...~·...[...,·...:...·+..l· ·...r...~....[..~....~...~ ..... ...1...·>....~..4··..t..·(>....~...oQo·,· --. "'oOon. .... ...~u.,~. ..~.... ... .... ... ..[... ....~....-;.-.....
::> ¡ 1 ¡ I ¡ ~ t· : ¡' ~ : ¡ ¡ : j : ¡ ¡ : ¡ ¡ ¡ ¡ ¡ ~ f: ¡ ¡
, " . V~ '^- ^" w ^"....v ~ ^V ~"'''''''''IuI':''' "^" .--.... .......'.W u__"'....... ..._~__.........,,4..,..Mv., '''"~...W^(w'''".".,.....W^'''~" ^"f^ ~^V;^W "^ '^" ,v.y~^ "......"^.~, W ~ w",'\"",v".,
VI ¡ ¡ ¡: $ ¡ : ~< ¡ . ¡ ¡ ¡ ¡ . ¡ : ¡ ¡ : ¡ ~ : ~ ¡ ¡ , .
.A' _.w -l"" "" . .,...- w._....,·,^' ":i-.'-1~""':""''''''' .....":'''iv~-~'--~...''''--'}''' "w:w.-tn"~--"\"-.-.-.c''''''''^1 W - ~ ~... "--t'".-¡ . .
........ : ~: : :: : r :.:: : i: : ::: : f : :
-== ¡t¡ ¡ ¡ëf¡ ~::¡ ¡¡!¡¡~:¡¡~!¡¡:¡ ¡ . :¡ ¡ L:
.:::: -...--.;............-..-:e-...................... ...... ....--...... _...¡.......-:--....~...... .........:.........)0....... .....-.s.........)".................. ......'S-..-.-..:-.......,........~......~..--.-~t.......t---H ........."..."........ ................ ..,................. ^... ........... .... ... .....f'.....
- 7000 - J...LJ....1: ....L..(>....L. ....L.l...!...l... ...L.l.~E·lml·l·: ~·I...t..·lw~...~.. ,J...L..l.J...$,...L..L.~ ....1.... ....L.. ....L...m ....L..~....L. ....... ..f..1..·f...t....
¡ ¡! ¡ ~: i: ~ : ¡ ¡ ¡ ì ¡ ¡ 1 f ¡ ¡ ¡ ¡ ; ~: :L ¡ ¡ , : . ¡ :
.'^-,<^Wr-I:Y^- ~'!'-r"{. ~~ ~v~o}' ,^" ^'~^'''\''v...^''''''''...'''?'''j~'w~...........«...l....I-+I^ ....1 ... "" , w~~ "'fb'"
: : (! : ¡ ¡: : : ~LOOS¡ ¡ ¡ : ¡ : .::: < : : :
- ....(0....... ... ....:-....~.... ,.... ....~... "'~"'(>"'1""'" .... ........... ·000'..'···..'·····..·.. ..·oQo,..I·,~~...~·... ....,.-. ·...~·...~....}...1...·~..·~....:'.. ~....... .... .,. ..·I..·...... ... ....
·~¡¡¡¡¡t¡~¡ ~ ¡ :;ìm¡'L¡ !¡ ¡ ~:: ~~:¡: ¡¡
;v^"~,.~'W. "",,, W^"',"'...." _""W{-,,~~ ",,(-.w ,,'" ,,"'<.............,,~.................. "'_w"" W'^'....--"1~..."·(>^' ,(-., "t"^(>^",W, _~........(_w~_"¡",,,^ __ " ^ _w 'w........ w.
~~( ~r ~_~~ ~, ¡~~: ~¡~~ ~i~ ¡~'~~¡i¡~ ~
.'=4 ....,....$.... ...(>......I···(>...f....'... ...^T ...(....(>...,... P &A ~.........Ò~....n'..~ ,y,. ............1....,.... ....,.........,....., ~ ... 1"'["'(>'" ....
: :: : ¡ : : : ~::.: ~ . j ! ¡ ¡ ¡ : ~ : 1 ¡ :: <: :::: I:
-8000 ...." u'*".· '1.......,¡· .........L....i'''f:'''' .W[:^....' ',u u ,......:"'''~'w¡ "':....i........¡' :r.....,¡.,...J...v...;"...;............~.......¡.--....J........,é..."'~........¡""ì·'''' .........<....,... . . :. ^'$tf' --0; :......~......"
: :: :1. !: ¡¡f¡: ¡¡\::~:¡'! :~: :::
'--.~ ,__ ,,_.;.....~. ~ __~"-"<~n_ ....-..< ~ ^,...... ,....."^~...............,y ~~ ,,-·:~4"""""":"....'f'^"':"--- 'n_~"w ....... _"" _" '^_ _..........~,,__<v~ _..... 'n --- -"
: j :: ¡ :, ¡ : , : ~ : : ¡ ~ : : ¡ : \ :
...I..·t...~... ....I..·¡..··t···.·...r...¡·..·~·..·) ...~··..~··..~··..¡....~··..~..·.a.J..·~..·.¡;....¡·..i..1L.~...L.~...l..J...¡......" "'1' "ï1..,...··'t ;.\., ....,.. ·it'.. ....
~ ¡ ¡:! ¡ ~ : ~ ~: ¡ ~ : ; : ? ! ¡ ¡: ¡ ¡ ¡ t : ¡ 11)'tI:":' : :
-~"""'^1-"- ~n'_~,^_ "---~}wnf"~o}""~"-'}"~1w.-.<'" "--:-_...t..._"}Yn~.o,.w"*...........--.....~,u,.w......,......... u".^W^V~_....__,.;..........:,,"v...__ "" .......1--~ >~. _+-v --".
~; ;; ; ¡ : ¡ LL mL. m.í~1"-++·+~ i¡ ~ 1 t 4 ¡"+'+'+-+-+--~---f ¡ .." -> ~ ~t- ;L. ..~ '. ¡ .:
-9000 ~"~W''';''''^' W' "u':"'".., 'u",,, "",,, ,ulv ~+~ ,J,^..ov.w~~'...."(>m.L-~~"J~'^"Jrv.w...~~...",.''''^''~..<...~uu'^ ~~~,., ~....~ "" ,~~ M~'W' ,~~~.
~ ~ : ~ ii ~~~i~ ~ ~ ~~~~ ~ ~ '. ;i 1,
-~J"'r'" ...r...(>... "·f=L.t..1... ...,..j. ....~....¡..............L..,........~....,...(>..J...LLLJ.......J~ v ~ ' .... ...~....~.....I~ on
¡ : ~ í ¡ : ~ ¡ ¡ ¡ j ~ ¡ ¡ ¡ ¡ ~ ¡ < ¡ ¡ ¡ ¡ ¡ ¡ ¡ ! ¡ 1 1 ¡ "'as! ~ ,mmi~~
_"^~^",,u..Æw,~,~,u u" '~~U,,~Wý.~..::.v~(V~lW".......w'^ ~.(>u'............t.....w"'rV^.¡....v~'''"v~.~w~"w.~''''~W^~''''}'wt~'''''''' ~,,,.... ...·..T" ~~ "'...""-~\~ &;'6 5-. o~+-Y~'(>""iw,~
4+--1.+--f...., ~ n"i-t---L+....lw ¡ ...r-", ...+..i·t...nt ·..+-+·+·+.1..4"'1-iyuyni..+..... ¡ ..·:,...t'" ~~~(\r"~"+ ~~'" ·~¡~r...L..
-1 000 0 T'ui~" .+u '-lm mruf~"r'1"1~ '^-¡ ~"1W^~^"'~f¡ wu~'t¡ n,+v+~1i--+1wrr: ¡ i"+,,tvu~'+n'l ·l·... ..+.+'+n~.... mr"'r +-, +-~r'
-.........¡""""":"" . ....,... ........(>...[..(>....}.... ..."'... '"(>'''i''' ...(>... ..·oOo...~.....,.......·,....oOo·...·..· ...v·..r..·'..·J..··....· ~... P &A ....".,.->....... ... ...(>...oo...(>...(>... .....
~¡ ¡ 1 ~ ¡ -+<: ::! ¡ ¡ <: ¡ : ~ ! ¡ ¡ : ~ ~ ¡ 1 ¡ ~ i ¡ . ~ 1 :. ¡ + ' : ¡ : :
=q-vfw 'w........"0ff II ..¡.....,..,.o,........~'l'....... ....~.o,.~'J'''~(w··r~u..,.w ~ -I'~' m.... .. r ..~.. m,>-..Li~l-EIÆ- .
: ~ :: ~ \ : ~ } : ~ : $ :. ~: ~: ~ : ~ : - - ~ ~ T ~::
. ·...t... .... :, L~m ...~....L..L*'""" . m~"'~....¿....),...~...~~. ...:-....:-....~... ...i...:-....L..<....:c....!....:-.. OR RUN COMPLETION ...1....¡...·~
~ :H 11: :¡¡: ::ii¡:~í1¡:~¡¡1¡~¡¡ ,¡¡
. w,...,w.. ,~"." ...,,, U "",*...".y'~"¡"""1 u.w'~~'l"~-.¡.~" .........(w."J." ,..."}..."...........................^-<-~')"......,¡w...t'~·w".(W"}" ""<ulu'.........·rwf..."i'~^t·"1..""·t'~1'l!..w·1u"t..... ~.. ,~.wu.(>......"....."
. ~ <. .. . . I . ~ .:---.~. S . l ',. . ¡ ¡ ..
11 000 ¡: ~ ¡: : ~ : : ¡ < : ~ : ~ ~ \ ~ ¡ ¡ . : , ¡ ¡. :
- . . I , I I I' I ) I " . I
-25 -20 -15 -10 -5 0 5 10 15 20 25
)
)
.
-.,.
.~.
", -',
....-:'.,'
.<~ .
'36
A
e=
6 Ui
1 1 -
l)
-l-
AA
BP
6UTi
1 i -
"t.V UAIt. ~Y· I.;K - AJt-' -
~IION
')
I I
550'
ICE PAD LIMITS ~
33.5'
"
i--- 222' ~
ALPINE #1 I
~-
.
I
I CUTTING STORAGE
-==:J ~ r::::- 252'
..
--
~t
RECEIVED
FEB 1 3 1995
,Alaska Oil & Gas Cons. Commission
Anchora,p
~.~"'..._,
~.~~ OF -_
.·Á ""'- \ ................ '..
. ; '\. \ ~., ", "".
. r-. ~.. *' 'f'..
. -~~ , ~
.k': ..1}1IJ£
· -.,.¡ 9t ~~~ ¡
¡. -.- -,,~_. -...!
I-pee- _.~- -". __.'L" - YO-
,~~~. N J. ROOKUS l!J
't ~.... L;-~35 ~.~J..
t.:-Þ~;··....~IIq'-'5 .......: C? ;
.... v ............. ~\I.
.'~OF'E'SSION"\.. \,~..
.......,~~.~
ARCO Alaska, Inc. <>
Subsidiary of Atlantic Richfield Company
CADD F1L£ NO. I DRAWING NO:
L.KS01172 1 /16/95
Kt.V - DAIt:. BY CK - At"f"
ut:.::!tc.... IIUN
R)'
~
o
~
550'
fE
~
~
~~
Scale 1" = 2 Miles
~
ALPINE #1
LOCA TED WITHIN PROTRACTED
SEC. 1, TWP. 11 N., RGE. 4 E.
UMIAT MERIDIAN
LAT. = 70· 19' 59.612"
LONG. = 151· 00' 37.253"
1,468' F.S.L, 2,248' F. W.L
Y = 5,972,482.25
X = 375,455.03
GROUND ELEV.= 6'
TOP ICE PAD ELEV.= 7.6'
NOTES
,. BASIS OF HORIZONTAL LOCATTON AND EZEVATTON
IS U.5. G.S. MONUMENTS CLEAR 4& BLACK.
2. COORDINA TES SHOWN ARE ALASKA STA TE: PLANE
ZONE 4, N.A.D. 27.
3. DATE OF SURVE:Y: 1/13/95.
4. £Z.£VA TTONS SHOWN ARE 8.P.M.5.L
SURVEYOR'S CERl1F1CA 1£
I H£RE8Y CERTTFY THA T I AM PROPERL Y REGlSTEREO AND
UCENS£D TO PRACTTC£ LAND SURVEYING IN THE STA T£ OF
ALA51<'A AND THA T THIS PLA T REPRESENTS A SURVEY
DONE BY ME OR UNDER MY DIRECT SUPERVISION AND
THA T AU DIMENSIONS AND OTHER DETAILS ARE CORRECT
AS OF JAN 1 J, 1995.
~ LOUNSBURY
& ASSOCIATES, INC.
GINBBRS PLANNBRS SURVEYORS
'q)
~ ~ 00
ALPINE #' EXPLORATORY WELL
CONDUCTOR & ICE PAD
AS-BUlL T
I SHEET· I REV: 0
CEA-MIXX-601D172 OÒ, OF ,
.
. ~y Ù~Ie.:-:- ';, ! ,'(ri \ -~, .~~IION :.1(1 G."u~ i .:.f" I ~ I (~Í't" ,
~ I '2/2g/D4 DB , AJR :,).E ww. I.OCA11ON ! l I, ) ! !
~' 10~' ~ (' : ~. \G' "~/~)(' (,--2_ ;í1~<;_-Þ ì-~-~~~o ~ --. ~
,?---\ . t>j. ø ' "---'::''h 0 .--¡, . ~ ~ .- ;
t·- ! N r, þ~/ i·' = ,if ¿) ~? iB' \ I~ \) I :
! ;,D ,\\ &7 (( (- ' Q ~
! \lu\: \ }J\\ 'ù () <I ~ ) .~\\ Y ~' î- ~ .~
~I ßg \~ D rD ~ f\ \'¿ DC __"
~90 22 \1 j I 'Z'/~~ ~~ 2% '\
: l ~ \ 1? Orz r /f1 ~ , C\J
~ '\ \ ' '-' .Ii/' _~,-r;?' . '\ ~~
. '\ D <)_ g(!!" /\ ~ ~ ~ I ?~
a 5 q Ì'-~J2 I ~""""'&""
,;- ~ O.~ ~ J1 ~IO ) iJ~3-4.. ~j~¡::~¡:~~ 3~
i c:J Tí~ N <1 .....!J f~ ~i~;~~~~~~~':
.. I (7s;~ . .......¡. .J ·w ..:~::_::::::~. ... /
j ~ T " N . !\~~: " /) ..;..~' ''':-::~:~*~'' ··-.....1&
¡; .~ . . cr r:J &~:~·..·...~~~~~f~ .~ I "'-
<J U ,. rALPl N : #1 I ,,,::,.;~ ~~ ""' Ir ", '~'" '~
... ~. .... ... + 3
r 10 ,11 ~~ n .~ 1 I "=--;~ ~ ~ (
LOCATED WllHlN PROìRACTED ,z' 7. ~ to
.o:!~i~ T ~ERj~~~O' 00· J- -I ð '.
~ ~O~G5.;7~~~~000· 37· ~ \: 0J (' l --- I ~ ç ,
x = 375.457 \V (::~,. L '1 ~ ~ ""1, ..
-~ ~p' :/ ' - - ~ (11
U 2;\ (', U (~~ FE: 1SpS 21~S-,)l Q zz L1
\ t&' I ~\'t1) . _. .._........92-7JA..:..... .
~ ~ ~ I cp l:J. ASSOCIATES, INC.
~ I \) JQ { .: zJf~...... PLUGa:II S1ì....v.
2. ì.\ ~ V Zß J ,I 25 ~ . ~ ,
ARCa Alaska, Inc. ~~ ' ALPINE #1, 1A
,,,. EXPLORATORY VÆl1..
SubsidIary of Atlantic Rrch1Jetd Company PERMIT EXHIBIT
~.K~,N6~ j 1'-/29/94 I DRAWING NO: NSK 6.01 d166 I SHEET:2 (:I 2 t REV: 1
:Þ-~IJU..
!.
~
t
~t.VI UAIè, I .; I ~'l;..n- J;,~l'(Ir"\lUN
,: 1 1'2/23/941 oa A.a! 1 R .) WELL LCCA110N
,,~-::.V' \""1\ II::. .d,. I Cf{, ~ ""¡oJ",, ,
¡ I )
~~
A.ìâ&ka Oil & Gas Cons. ~ommissbn
ðpchora,~;e ~
- ,.-
WAJNYtRlCHT
F~IR8"NKS
.
I
I
!~Q
--........
o
I
f
I
I
I
I
~
ALPINE #1 ¡ 1. fJ
LA T -- 7Q- 20' 00·
LONG. = 15'· 00' 37·
KAKTOvtK
\
\
\
\
I,
ì )"" ,
c..c.
~i
~~
u .
l ' . 69 .
I
\
\
\
\
I
:.r
-..t
.
~
.
1",
~
-
-
\~ \_ ôg·
rt---y-
\- ì \
\ \ \
1-
.
66·
I
4(<Í.
~O
(/)4'(
<íZ
.Jc!.
<ü
I
\
.
I
I.r)
co
.....
~ LOUNSBURY
& ASSaCL\.TES. INC.
r..1~J."- ~ Stl.,.~....
~
.
0)
I()
-
~
tI)
.
A -
ARCa Alaska, Inc...,,..
Subsidiary of Atlantic RIchfield Company
CADO F1L£ NO. I DRAW1NG NO:
1J<601166 '2/29/94.
ALPINE 11,1 fJ
~LORA TORY WELl.
PERMIT EXHIBIT
NSK 6.01 d166 I SHEET: 1 OF 2 I REV: 1
)
)
PROPOSED DIRECTIONAL PROGRAM
ALPINE #1A (SIDETRACK)
(Per 20 AAC 25.050)
R tCt\\j\:t>
~ E 8 ì ~ î99S .
eomm\SS\ot\
" & Gas cons.
.,I/'.l ü\\ . .
~\~';)t\U. ~nchOh
)
)
ARCO ALASKA, Inc.
Alpine #1
Alpine#1
slot #1
Exploration
North Slope, Alaska
PRO P 0 S ALL 1ST I N G
by
Baker Hughes INTEQ
Your ref
Our ref
License
Alpine #1 Rd#1 Vers.#2
prop1157
Date printed
Date created
Last revised
13-Feb-95
12-Feb-95
13-Feb-95
Field is centred on n70 28 24.450,w148 49 2.487
Structure is centred on n70 19 59.612,w151 0 37.253
Slot location is n70 19 59.612,w151 0 37.253
Slot Grid coordinates are N 5972482.257, E 375455.044
Slot local coordinates are 0.00 N 0.00 E
Reference North is True North
RECEIVED
FEB 1 4 1995
A\aska Oil & Gas Cons. Commission
Anchora "
) ')
ARCO ALASKA, Inc. PROPOSAL LI STI NG Page 1
Alpine #1,Alpine#1 Your ref : Alpine #1 Rd#1 Vers.#2
Exploration,North Slope, Alaska Last revised: 13-Feb-95
Measured Incl in. Azimuth True Vert. R E C TAN G U L A R Dogleg Vert
Depth Degrees Degrees Depth COO R DIN ATE S Deg/100Ft Sect
1900.00 1.08 128.56 1899.85 8.69 S 15.28 E 0.00 -15.59 KOP - Sidetrack pt
2000.00 2.00 336.44 1999.83 7.68 S 15.32 E 3.00 -14.76
2100.00 4.98 330.61 2099.64 2.29 S 12.49 E 3.00 -8.70
2200.00 7.98 329. 14 2198.98 7.46 N 6.80 E 3.00 2.58
2300.00 10.98 328.48 2297.61 21.53 N 1 .74 W 3.00 19.04
2394.61 13.81 328.11 2390.00 38.81 N 12.42 W 3.00 39.34 C-30
2400.00 13 .98 328.09 2395.24 39.90 N 13.10 W 3.00 40.63
2500.00 16.98 327.84 2491.60 62.52 N 27.26 W 3.00 67.31
2600.00 19.98 327.66 2586.43 89.32 N 44. 17 W 3.00 99.00
2700.00 22.97 327.53 2679.48 120.22 N 63.79 W 3.00 135.60
2766.23 24.96 327.46 2740.00 142.91 N 78.25 W 3.00 162.50 C-20
2800.00 25.97 327.43 2770.48 155.15 N 86.06 W 3.00 177.02
2900.00 28.97 327.34 2859.20 194.00 N 110.92 W 3.00 223. 15
3000.00 31 .97 327.28 2945.37 236.68 N 138.31 W 3.00 273.86
3100.00 34.97 327.22 3028.78 283.06 N 168.15 W 3.00 329.01
3200.00 37.97 327. 17 31 09. 18 333.02 N 200.36 W 3.00 388.45
3300.00 40.97 327.12 3186.36 386.42 N 234.84 W 3.00 452.02
3400.00 43.97 327.08 3260.11 443.11 N 271.51 W 3.00 519.53
3500.00 46.97 327.05 3330.23 502.94 N 310.26 W 3.00 590.82
3600.00 49.97 327.02 3396.52 565.74 N 351.00 W 3.00 665.67
3636.84 51.08 327.01 3419.94 589.60 N 366.48 W 3.00 694.11 EOC
4000.00 51.08 327.01 3648.10 826.58 N 520.33 W 0.00 976.65
4289.54 51.08 327.01 3830.00 1015.52 N 642.99 W 0.00 1201.92 K-3
4500.00 51.08 327.01 3962.22 1152.86 N 732.15 W 0.00 1365 .65
4623.80 51.08 327.01 4040.00 1233.64 N 784.59 W 0.00 1461. 97 K-2
5000.00 51.08 327.01 4276.35 1479.13 N 943.97 W 0.00 1754.66
5500.00 51 . 08 327.01 4590.48 1805.41 N 1155.79 W 0.00 2143.66
6000.00 51.08 327.01 4904.60 2131.68 N 1367.61 W 0.00 2532.66
6311.02 51.08 327.01 5100.00 2334.64 N 1499.37 W 0.00 2774.64 Albian B
6500.00 51.08 327.01 5218.73 2457.96 N 1579.43 W 0.00 2921.67
7000.00 51.08 327.01 5532.86 2784.24 N 1791.25 W 0.00 3310.67
7202.38 51.08 327.01 5660.00 2916.30 N 1876.98 W 0.00 3468.12 Albian C
7500.00 51.08 327.01 5846.98 3110.52 N 2003.07 W 0.00 3699.67
8000.00 51.08 327.01 6161.11 3436.79 N 2214.89 W 0.00 4088.68
8500.00 51.08 327.01 6475.24 3763.07 N 2426.71 W 0.00 4477.68
8953.26 51.08 327.01 6760.00 4058.85 N 2618.73 W 0.00 4830.32 HRZ
9000.00 51.08 327.01 6789.36 4089.35 N 2638.53 W 0.00 4866.68
9207.94 51.08 327.01 6920.00 4225.04 N 2726.62 W 0.00 5028.46 K-1
9351.19 51.08 327.01 7010.00 4318.52 N 2787.31 W 0.00 5139.91 LCU
9494.45 51.08 327.01 7100.00 4412.00 N 2848.00 W 0.00 5251.37 J-4 Sand - TI Alpine Prospect
9500.00 51.08 327.01 7103.49 4415.62 N 2850.35 W 0.00 5255.69
9542.20 51.08 327.01 7130.00 4443. 16 N 2868.23 W 0.00 5288.52 Base J-4 Sand
9971.96 51.08 327.01 7400.00 4723.60 N 3050.29 W 0.00 5622.88 Planned TD
10000.00 51.08 327.01 7417.62 4741.90 N 3062.17 W 0.00 5644.69
10500.00 51.08 327.01 m1.74 5068.18 N 3273.99 W 0.00 6033.69 RECEIVED
10608.65 51.08 327.01 7800.00 5139.08 N 3320.02 W 0.00 6118.22 Permitted TD
FEB 1 4 1995
AIé1ska Oil & Gas Cons. CommissIon
Anchorél
All data is in feet unless otherwise stated
Coordinates from slot #1 and TVD from RKB (38.00 Ft above Mean Sea Level).
Vertical section is from wellhead on azimuth 327.16 degrees.
Declination is 0.00 degrees, Convergence is -0.95 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
)
)
ARCO ALASKA, Inc.
Alpine #1,Alpine#1
Exploration,North Slope, Alaska
PROPOSAL LISTING Page 2
Your ref : Alpine #1 Rd#1 Vers.#2
Last revised: 13-Feb-95
Comments in wellpath
--------------------
--------------------
MD
TVD
Rectangular Coords.
Comment
-------------------.--------------------------------------------------------------------------------------------
1900.00 1899.85 8.69 S 15.28 E KOP - Sidetrack pt
2394.61 2390.00 38.81 N 12.42 W C-30
2766.23 2740.00 142.91 N 78.25 W C-20
3636.84 3419.94 589.60 N 366.48 W EOC
4289.54 3830.00 1015.52 N 642.99 W K-3
4623.80 4040.00 1233.64 N 784.59 W K-2
6311.02 5100.00 2334.64 N 1499.37 W Albian B
7202.38 5660.00 2916.30 N 1876.98 W Albian C
8953.26 6760.00 4058.85 N 2618.73 W HRZ
9207.94 6920.00 4225.04 N 2726.62 W K-1
9351.19 7010.00 4318.52 N 2787.31 W LCU
9494.45 7100.00 4412.00 N 2848.00 W J-4 Sand - TI Alpine Prospect
9542.20 7130.00 4443. 16 N 2868.23 W Base J-4 Sand
9971.96 7400.00 4723.60 N 3050.29 W Planned TD
10608.65 7800.00 5139.08 N 3320.02 W permi tted TD
Casing positions in string lA'
-------------------------------
-------------------------------
Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing
----------------------------------------------------------------------------------------------------------------
nla
nla
1899.85
1899.85
8.69S
8.69S
15.28E nla 1899.85
15.28E 10608.65 7800.00
8.69S 15.~8E 13 3/8" Casing
5139.08N 3320.02W ~I Casing
Targets associated with this wellpath
-------------------------------------
-------------------------------------
Target name
Position
T.V.D. Local rectangular coords. Date revised
----------------------------------------------------------------------------------------------------------------
J-4 TI Alpine Rvsed not specified
7100.00
4412.00N 2848.00W 12-Feb-95
R E~E IVE D
FES 1 4 1995
A'öska Oil & Gas Cons. Commission
Anchora
All data is in feet unless otherwise stated
Coordinates from slot #1 and TVD from RKB (38.00 Ft above Mean Sea Level).
Bottom hole distance is 6118.22 on azimuth 327.14 degrees from wellhead.
Total Dogleg for wellpath is 52.10 degrees.
Vertical section is from wellhead on azimuth 327.16 degrees.
Declination is 0.00 degrees, Convergence is -0.95 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
')
ARca
ALASKA,
)
Inc.
Created by jones For: F JOHNSON
Dote plotted : 13-Feb-95
Plot Reference is Alpine # 1 Rd# 1 Vers.#2.
Coordinates are in feet reference slot # 1.
True Vertical Depths are reference RKB.
Field : Exploration
Well : Alpine# 1
Structure : Alpine # 1
Location : North Slope. Alaska
--- Baker Hughes INTEQ ---
0
0 1200_
d
u")
1500_
V
Õ
0 1800_
(/)
2100_
2400_
2700_
JOOO_
..£: E'
-+- J300_
0...
Q)
0 3600_
3900_
0
U 4200_
-+-
L
(l) 4500_
>
4800_
())
:J 5100_
L
I- 5400_
I 5700_
I
V 6000 _
6300_
6600_
6900_
7200_
7500_
7800_
8100 I
300
S<:ole 1 : 200.00
400 400
_5200
_ 4800
_4400
_4000
_J6oo
_3200 ^
I
_2800 I
_2400 Z
0
_2000 ,
-+-
_1600 ::J
_1200
_800
(/)
n
_ 400 0
iÞ
_ 0 N
0
0
0
_ 400 0
3600 3200 2800 2400 2000 1600 1200 800
<--
West
m
J - 4 SAND LOCA nON:
600' FSL, 600' FEL
SEC. 35. TI2N, R4E
J-4 SAND
1YD=71 00
TMD=9494
DEP=s251
;:l 1 J 3/8" Cosing ~~~iH 1JU
KOP - SIDETRACK PT 1YD=1900 TMD=1900 DEP=-16
1.03
3.99
ð.98
9.98
12.98
15.98
18.97
21.97 3 DEG I 100' DLS
24.117
27.97
30.97
33.97
36.97
39.97
42.97
45.D7
48.97 EOC TVD=3420 TMD=3637 DEP=694
35
2
N 32.84 DEG W
6118' (TO PERMIT TD)
...PLANE or PROPOSAl...
AVERAGE ANGLE
51.08 DEG
FEB 1 4 1995
Alaska Dil & Gas Cons C .
A h . ommlsslOn
nc ora ."'
36
SURFACE LOCATION:
1466' FSL, 2246' FWL
SEC. 1. Tl1 N, R4E
"·NOTE"·
J4 SAND ND=7100 TMD=9494 DEP=5251
MINIMUM VERTICAL SECTION OF
5251' MUST BE AcmEVED AT
9494' MD / 7100' TVD
PLANNED TO ND=7400 TMO=9972 OEP=5623
PERMITTED TO TVD=7800 TMD=10609 DEP=6118 ')""
I I I I I I I I I I I I I I I I I I I I I
300 600 900 1200 1500 1800 2100 2400 2700 3000 3300 3600 3900 4200 4500 4800 5100 5400 5700 6000 6300
Scale 1 : 1 50.00
Vertical Section on 327.16 azimuth with reference 0.00 N, 0.00 E from slot #1
)
')
ARCO ALASKA, Inc.
Alpine #1
Alpine#1
slot #1
Exploration
North Slope, Alaska
PRO P~S ALL 1ST I N G
by
Baker Hughes INTEQ
Your ref
Our ref
License
Alpine #1 Rd#1 Vers.#1
prop1157
Date printed: 12-Feb-95
Date created: 12-Feb-95
Last revised : 12-Feb-95
Field is centred on n70 28 24.450,w148 49 2.487
Structure is centred on n70 19 59.612,w151 0 37.253
Slot location is n70 19 59.612,w151 0 37.253
Slot Grid coordinates are N 5972482.257, E 375455.044
Slot local coordinates are 0.00 N 0.00 E
Reference North is True North
R f.CE\\Jf.tJ
Q '\ ~ '995
tt.o ""
corom\SS\O
.' &. ßas Cons.
.\''J u\\ ~ .~
þ,.\a.':>fW' ~nchO{'
COMPANY ,4 /"(' J r:I
INIT CLASS 1".), J ~ U ..,'-1'
A ~,0c-
Ç'9rJ
ON/OFF SHORE
(V'~
//l
PROGRAM: exp []
dev [] redrll';1( serv []
WELL PERMIT CHECKLIST
FIELD & POOL
/V.At
ADMINISTRATION
(
APPR
Il~
(
APPR
d1-
DATE
¥~?r-
ENGINEERING
14.
15.
16.
17.
lB.
19.
20.
21.
22.
23.
24.
25.
;¡~/~~26.
~ 27.
2B.
29.
--
GEOLOGY
~ zJ;/~
''-''\,,:heklist rev 03194
WELL NAME
.A/~ /9..
UNIT#
GEOL AREA
1.
2.
3.
4.
5.
6.
, 7.
8.
9.
10.
11.
12.
13.
.Q N
. a> N
Unique well name and number. . . .(i5 N
Well located in a defined pool. . . . . . . . . . . . . .Y (]E)
Well located proper distance from drlg unit boundary. . ~ N
Well located proper distance from other wells. . . . . c:xJ N
Sufficient acreage available in drilling unit. ~ N
If deviated, is wellbore plat included . . . . . . ~ N
operator only affected party. . . . . . . ..Y N
Operator has appropriate bond in force. . . . . . . .. . N
Permit can be issued without conservation order. . . . fB· N
Permit can be issued without administrative approval.. . N
Can permit be approved before 15-day wait. . . . . . . . Y N
REMARKS
Permit fee attached. . . . . .
Lease number appropriate. .
30.
31-
32.
33.
34.
Conductor string provided . . . . . . . . . . . . . . . ~ N
Surface casing protects all known USDWs . . . . . . . . ~.. N
CMT vol adequate to circulate on conductor & surf csg. ~ N
CMT vol adequate to tie-in long string to surf csg . . . Y ~
CMT will cover all known productive horizons. . . {]) N
Casing designs adequate for C, T, B & permafrost. . . . ~ N
Adequate tankage or reserve pit. . . . . . . . . . . . .~ N
If a re-drill, has a 10-403 for abndnmnt been approved..Y N
Adequate wellbore separation proposed. . . . . . . . . .~ N
If diverter required, is it adequate. . . . . . . . . . ~
Drilling fluid program schematic & equip list adequate .~ N
BOPEs ade9uate . . . . . . . . . . . . . . . . . . . . .(Î5 N
BOPE press rating adequate; test to ,~ psig.(!) N
Choke manifold complies w/API RP-53 (May 84).. ...~ ~~
Work will occur without operation shutdown. . . . CD N I ...L
Is presence of ":,8 gas probable. . . . . . . . . . .Y (!) *0I'P~^~ "-2 /. vol .['r "",1 4-Xr~ /,-1. ~.J I.. ¿q-"9~.
7.6"". ".'i:.~ (e.) 2)"/)) I 7)t!. s-t.f. r/",j{'I~ t"t¿¡{~""J
Permit can be issued w/o hydrogen sulfide measures. . .~Y N (~" t. 9/""'''£...1 OJI't"'"~ /--.1-"1 ~/,..~(":~ (£. ~J&-jl ~P.rj
Data presented on potential overpressure zones . . .. N;/ç. .. ~ V ) ! < I ,¡ d V.o.. V
Seismic analysis 9f shallow gas zones. . . . . . N (!):; ~ d..A. J/o' /I r L"'Yt.-r,--O II )('"1,,0{ pjt - ^~c: ...
Seabed condition survey (if off-shore) . ~ ~..4~ ~ fI
Contact name/phone for weekly progress reports. .0 N ~'t"",/ ¡¡;'-¡A.-J~~ý) .::2..6t5 -/9?.:? ð 4~ /#JC.~~d
[exploratory only]
2-65- b.:??<j"
t:::t
0
Z
0
H {
~
:::0
H
H
tI::1
H
Z
H
::r::
H
en
en
toçI
>
0
tI::1
1Ìt- frz,. J rt2- ,:s .?
Wtf'...: ¿J
GEOLOGY:
RPrh/ _
ENGINEERING:
B~~~ 'l.11£I
JDH~
COMMISSION:
D~
RAD ____
TAB'~
.
comments/Instructions:
')
)
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
f'
"
~pe Subfile 2· is t~pe: LIS
\(
9 VD\J
ALPINE #lA ' /"" \..: '3
501032021101 ~
ARCO ALASKA INCORPORATED
SPERRY-SUN DRILLING SERVICES
23-JUN-95
(
TAPE HEADER
EXPLORATION UNIT
MWD /MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4'
6382.01
DOUG ELLIS
D. BUMGARNER
MWD RUN
5
MWD RUN
o '!f11 Vi rJ
6
JOB NUMBER:
LOGGING ENGINEER: DOUG ELLIS
OPERATOR WITNESS: DON McKELVEY
DOUG ELLIS
DON McKELVEY
DOUG ~~lS
DON ~KÉL1!W E D
\JUL 09 1995
Ala.~k~ .Oil (. .',
,'0. CommfS810
hiii,.¡iìorage n
DOUG ELLIS
D. BUMGARNER
MWD RUN 7
MWD RUN 8
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
1
11N
4E
1465
Atl(~
2250
38.00
30.62
7.60
#
WELL CASING RECORD
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2ND STRING
3RD STRING 16.000
PRODUCTION STRING 8.500
20.000
13.375
120.0
1768.0
9940.0
#
REMARKS:
MWD - DGR/EWR4/CNP/DSFD.
LOCATION: Y=5972482.25 X=375455.03
ALL DEPTHS ARE BIT DEPTHS REFERENCED TO DRILLERS
TALLY.
CRITICAL VELOCITIES ARE CALCULATED USING THE BINGHAM
PLASTIC MODEL.
ALL DATA WAS RECORDED DOWNHOLE WHILE DRILLING UNLESS
OTHERWISE STATED.
NEUTRON POROSITY DATA IS PROCESSED ON A SANDSTONE
MATRIX USING THE CNP-E ALGORITHM.
FORMATION DENSITY DATA IS FROM A DUAL SOURCE TOOL
PROCESSED USING THE DSD-B ALGORITHM.
REPEAT SECTION 1 (MAD PASS 1 RECORDED PRIOR TO MWD RUN
$
NO DEPTH SHIFTS WERE DONE AS THIS LOG IS THE DEPTH
REFERENCE FOR THIS WELL.
. 7) ~ROM 4600 MD TO 4700' MD WAS LOGGED 100 HOURS
AFTER DRILLING.
REPEAT SECTION 2 (MAD PASS 2 RECORDED AFTER MWD RUN 8)
FROM 9550 MD TO 9865' MD WAS LOGGED 11 HOURS AFTER
DRILLING.
((
(
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
RP
NPHI
RHOB
$
(
(
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
1700.0
1700.0
7512.0
7520.0
STOP DEPTH
9910.0
9888.0
9896.0
9903.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
$
#
REMARKS:
BIT RUN NO
4
5
6
7
8
MERGE TOP
1805.0
4874.0
6217.0
7568.0
8186.0
MERGE BASE
4874.0
6217.0
7568.0
8186.0
9940.0
MERGED MAIN PASS.
NO DEPTH SHIFTS WERE APPLIED.
MERGED DATA FOR ROUGHLY THE TOP 100' IS FROM THE
PILOT HOLE, ALPINE - 1.
$
#
CN
WN
FN
COUN
STAT
ARCO ALASKA INC.
ALPINE #lA
WEST COLVILLE EXPLOR
NORTH SLOPE
ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
9 Curves:
API API API API
Log Cry Crv
Name Tool Code Samples Units Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4 4 90 310 01 1
2 RPX MWD 68 1 OHMM 4 4 90 120 46 1
3 RPS MWD 68 1 OHMM 4 4 90 120 46 1
4 RPM MWD 68 1 OHMM 4 4 90 120 46 1
5 RPD MWD 68 1 OHMM 4 4 90 120 46 1
(' {
6 NPHI MWD 68 1 PU-S 4 4 90 890 01 1
7 RHOB MWD 68 1 G/C3 4 4 90 350 01 1
8 ROP MWD 68 1 FPHR 4 4 90 810 01 1
9 FET MWD 68 1 HR 4 4 90 180 01 1
-------
36
* DATA RECORD
(TYPE# 0) 1006 BYTES *
Total Data Records: 665
Tape File start Depth
Tape File End Depth
Tape File Level spacing =
Tape File Depth Units
=
10000.000000
1700.000000
0.500000
=
= Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
Tape Subfile: 2
166011 datums
774 records...
Minimum record length:
Maximum record length:
46 bytes
1006 bytes
f
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
DGR
EWR4
$
2
(,
log header data for each bit run in separate files.
4
.5000
START DEPTH
1770.0
1762.0
STOP DEPTH
4840.0
4832.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
EWR4 ELECTROMAG. RESIS. 4
DGR DUAL GAMMA RAY
$
#
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
19-FEB-95
2.19A/2.05
3.93 11.37
MEMORY
4874.0
1805.0
4874.0
o
1.4
50.3
TOOL NUMBER
P0323CGR6
P0323CGR6
8.500
1768.0
BLAND
10.30
43.0
8.7
1400
4.8
2.600
1.610
1.900
2.000
78.0
130.0
78.0
78.0
.00
.000
. 0
o
62 bytes
998 bytes
Minimum record length:
Maximum record length:
52809 datums
Rep Code: 68
Tape Subfile: 3
278 records...
LIS representation code decoding summary:
**** FILE TRAILER ****
= Feet
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth units
5000.000000
1700.000000
0.500000
=
=
Total Data Records: 213
998 BYTES *
(TYPE# 0)
* DATA RECORD
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
API API API API
Log Cry Cry
Name Tool Code Samples units Size Length Typ Typ CIs Mod
1 GR MWD 68 1 AAPI 4 4 90 310 01 1
2 RPX MWD 68 1 OHMM 4 4 90 120 46 1
3 RPS MWD 68 1 OHMM 4 4 90 120 46 1
4 RPM MWD 68 1 OHMM 4 4 90 120 46 1
5 RPD MWD 68 1 OHMM 4 4 90 120 46 1
6 ROP MWD 68 1 FPHR 4 4 90 810 01 1
7 FET MWD 68 1 HR 4 4 90 180 01 1
....-----...
28
ARCO ALASKA INC.
ALPINE #lA
WEST COLVILLE EXPLOR
NORTH SLOPE
ALASKA
CN
WN
FN
COUN
STAT
#
MWD RUN 4.
$
REMARKS:
(
('
('
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
DGR
EWR4
$
3
t
log header data for each bit run in separate files.
5
.5000
START DEPTH
4842.0
4835.0
STOP DEPTH
6188.0
6180.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
EWR4 ELECTROMAG. RESIS. 4
DGR DUAL GAMMA RAY
$
#
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
21-FEB-95
2.19A/2.05
3.93 11.37
MEMORY
6217.0
4874.0
6217.0
o
49.2
51.9
TOOL NUMBER
P0323CGR6
P0323CGR6
8.500
1768.0
BLAND
10.00
42.0
9.2
500
5.6
6.300
4.690
4.100
3.500
78.0
107.0
78.0
78.0
.00
.000
. 0
o
62 bytes
998 bytes
Minimum record length:
Maximum record length:
211 records...
Tape Subfile: 4
202180 datums
Rep Code: 68
LIS representation code decoding summary:
**** FILE TRAILER ****
= Feet
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth units
6250.000000
3990.000000
0.500000
=
=
Total Data Records: 146
998 BYTES *
(TYPE# 0)
* DATA RECORD
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
API API API API
Log Crv Crv
Name Tool Code Samples units Size Length Typ Typ CIs Mod
1 GR MWD 68 1 AAPI 4 4 90 310 01 1
2 RPX MWD 68 1 OHMM 4 4 90 120 46 1
3 RPS MWD 68 1 OHMM 4 4 90 120 46 1
4 RPM MWD 68 1 OHMM 4 4 90 120 46 1
5 RPD MWD 68 1 OHMM 4 4 90 120 46 1
6 ROP MWD 68 1 FPHR 4 4 90 810 01 1
7 FET MWD 68 1 HR 4 4 90 180 01 1
-------
28
ARCO ALASKA INC.
ALPINE #lA
WEST COLVILLE EXPLOR
NORTH SLOPE
ALASKA
CN
WN
FN
COUN
STAT
#
MWD RUN 5.
$
REMARKS:
11
(
('
('
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
DGR
EWR4
$
4
('
log header data for each bit run in separate files.
6
.5000
START DEPTH
6179.0
6171.0
STOP DEPTH
7527.0
7520.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
EWR4 ELECTROMAG. RESIS. 4
DGR DUAL GAMMA RAY
$
#
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
23-FEB-95
2.19A/2.05
3.93 /1.37
MEMORY
7568.0
6217.0
7568.0
o
50.2
52.9
TOOL NUMBER
P0323CGR6
P0323CGR6
8.500
1768.0
BLAND
10.10
40.0
9.0
500
5.5
6.400
4.240
4.000
3.400
76.0
118.0
76.0
76.0
.00
.000
.0
o
62 bytes
998 bytes
Minimum record length:
Maximum record length:
76818 datums
Rep Code: 68
Tape Subfile: 5
162 records...
LIS representation code decoding summary:
**** FILE TRAILER ****
= Feet
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth units
=
7600.000000
6100.000000
0.500000
=
Total Data Records: 97
998 BYTES *
(TYPE# 0)
* DATA RECORD
API API API API
Log Crv Crv
Name Tool Code Samples Units Size Length Typ Typ CIs Mod
1 GR MWD 68 1 AAPI 4 4 90 310 01 1
2 RPX MWD 68 1 OHMM 4 4 90 120 46 1
3 RPS MWD 68 1 OHMM 4 4 90 120 46 1
4 RPM MWD 68 1 OHMM 4 4 90 120 46 1
5 RPD MWD 68 1 OHMM 4 4 90 120 46 1
6 ROP MWD 68 1 FPHR 4 4 90 810 01 1
7 FET MWD 68 1 HR 4 4 90 180 01 1
-------
28
7 Curves:
Tape depth ID: F
ONE DEPTH PER FRAME
(TYPE# 64)
* FORMAT RECORD
ARCO ALASKA INC.
ALPINE #lA
WEST COLVILLE EXPLOR
NORTH SLOPE
ALASKA
CN
WN
FN
COUN
STAT
#
MWD RUN 6.
$
REMARKS:
II
(
(
SANDSTONE
2.65
74.0
130.0
74.0
74.0
4.000
2.528
3.800
2.600
BLAND
10.10
39.0
9.1
500
5.4
8.500
1768.0
TOOL NUMBER
P0335CRNDG6
P0335CRNDG6
P0335CRNDG6
P0335CRNDG6
53.4
55.4
2.19A/2.05
3.93 11.37
MEMORY
8186.0
7568.0
8186.0
o
24-FEB-95
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
#
BOTTOM)
TOOL TYPE
ELECTROMAG. RESIS. 4
COMPENSATED NEUTRON
DUAL SOURCE DENSITY
DUAL GAMMA RAY
TOOL STRING (TOP TO
VENDOR TOOL CODE
EWR4
CNP
DSFD
DGR
$
#
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
8144.0
8122.0
8130.0
8137.0
START DEPTH
7527.0
7505.0
7512.0
7520.0
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
DGR
EWR4
CNP
DSFD
$
log header data for each bit run in separate files.
7
.5000
5
Tape Subfile 6 is type: LIS
("
(
46 bytes
1006 bytes
Minimum record length:
Maximum record length:
216191 datums
Rep Code: 68
Tape Subfile: 6
126 records...
API API API API
Log Crv Crv
Name Tool Code Samples units Size Length Typ Typ CIs Mod
1 GR MWD 68 1 AAPI 4 4 90 310 01 1
2 RPX MWD 68 1 OHMM 4 4 90 120 46 1
3 RPS MWD 68 1 OHMM 4 4 90 120 46 1
4 RPM MWD 68 1 OHMM 4 4 90 120 46 1
5 RPD MWD 68 1 OHMM 4 4 90 120 46 1
6 NPHI MWD 68 1 PU-S 4 4 90 890 01 1
7 RHOB MWD 68 1 G/C3 4 4 90 350 01 1
8 ROP MWD 68 1 FPHR 4 4 90 810 01 1
9 FET MWD 68 1 HR 4 4 90 180 01 1
-------
36
* DATA RECORD (TYPE# 0) 1006 BYTES *
Total Data Records: 57
Tape File Start Depth = 8200.000000
Tape File End Depth = 7500.000000
Tape File Level Spacing = 0.500000
Tape File Depth units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
9 Curves:
Tape depth ID: F
ONE DEPTH PER FRAME
(TYPE# 64)
* FORMAT RECORD
ARCO ALASKA INC.
ALPINE #lA
WEST COLVILLE EXPLOR
NORTH SLOPE
ALASKA
CN
WN
FN
COUN
STAT
#
MWD RUN 7.
$
REMARKS:
#
(
\
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
o
. 0
.000
(
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
DGR
EWR4
CNP
DSFD
$
6
~..
log header data for each bit run in separate files.
8
.5000
START DEPTH
8143.0
8121.0
8129.0
8136.0
STOP DEPTH
9910.0
9888.0
9896.0
9903.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
EWR4
CNP
DSFD
DGR
$
BOTTOM)
TOOL TYPE
ELECTROMAG. RESIS. 4
COMPENSATED NEUTRON
DUAL SOURCE DENSITY
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
27-FEB-95
2.19A/2.05
3.93 /1.37
MEMORY
9940.0
8186.0
9940.0
o
47.8
55.4
TOOL NUMBER
P0335CRNDG6
P0335CRNDG6
P0335CRNDG6
P0335CRNDG6
8.500
1768.0
BLAND
10.10
39.0
8.9
400
5.6
2.400
1.350
2.600
3.000
72.0
133.0
72.0
72.0
SANDSTONE
2.65
('
HOLE CORRECTION (IN):
('
.000
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
.0
o
#
REMARKS:
MWD RUN 8.
$
#
CN
WN
FN
COUN
STAT
ARCO ALASKA INC.
ALPINE #lA
WEST COLVILLE EXPLOR
NORTH SLOPE
ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
9 Curves:
API API API API
Log Crv Crv
Name Tool Code Samples units Size Length Typ Typ CIs Mod
1 GR MWD 68 1 AAPI 4 4 90 310 01 1
2 RPX MWD 68 1 OHMM 4 4 90 120 46 1
3 RPS MWD 68 1 OHMM 4 4 90 120 46 1
4 RPM MWD 68 1 OHMM 4 4 90 120 46 1
5 RPD MWD 68 1 OHMM 4 4 90 120 46 1
6 NPHI MWD 68 1 PU-S 4 4 90 890 01 1
7 RHOB MWD 68 1 G/C3 4 4 90 350 01 1
8 ROP MWD 68 1 FPHR 4 4 90 810 01 1
9 FET MWD 68 1 HR 4 4 90 180 01 1
-------
36
* DATA RECORD
(TYPE# 0) 1006 BYTES *
Total Data Records: 153
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth units
=
10000.000000
8100.000000
0.500000
=
= Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
Tape Subfile: 7
114829 datums
222 records...
Minimum record length:
Maximum record length:
46 bytes
1006 bytes
("
Tape Subfile 8 is type: LIS
FILE HEADER
FILE NUMBER:
RAW MAD
Curves and log
MAD RUN NUMBER:
MAD PASS NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
DGR
EWR4
CNP
DSFD
$
7
(
header data for each pass of each run in separate files.
7
1
.5000
START DEPTH
4529.0
4508.0
4515.0
4523.0
STOP DEPTH
4745.0
4723.0
4730.0
4737.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
EWR4
CNP
DSFD
DGR
$
BOTTOM)
TOOL TYPE
ELECTROMAG. RES IS. 4
COMPENSATED NEUTRON
DUAL SOURCE DENSITY
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
24-FEB-95
2.19A/2.05
3.93 11.37
MEMORY
8186.0
4508.0
4786.0
o
53.4
55.4
TOOL NUMBER
P0335CRNDG6
P0335CRNDG6
P0335CRNDG6
P0335CRNDG6
8.500
1768.0
BLAND
10.10
39.0
9.1
500
5.4
4.000
2.528
3.800
2.600
74.0
130.0
74.0
74.0
SANDSTONE
62 bytes
1014 bytes
Minimum record length:
Maximum record length:
92 records...
Tape Subfile: 8
221601 datums
Rep Code: 68
LIS representation code decoding summary:
**** FILE TRAILER ****
= Feet
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth units
=
4800.000000
4500.000000
0.500000
=
Total Data Records: 22
(TYPE# 0) 1014 BYTES *
* DATA RECORD
REMARKS: REPEAT SECTION 1 (MAD PASS 1) RUN PRIOR TO MWD RUN 7.
$
#
CN : ARCO ALASKA INC.
WN : ALPINE #lA
FN : WEST COLVILLE EXPLOR
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
8 Curves:
API API API API
Log Cry Crv
Name Tool Code Samples units Size Length Typ Typ CIs Mod
1 GR MWD 68 1 AAPI 4 4 90 310 01 1
2 RPX MWD 68 1 OHMM 4 4 90 120 46 1
3 RPS MWD 68 1 OHMM 4 4 90 120 46 1
4 RPM MWD 68 1 OHMM 4 4 90 120 46 1
5 RPD MWD 68 1 OHMM 4 4 90 120 46 1
6 NPHI MWD 68 1 PU-S 4 4 90 890 01 1
7 RHOB MWD 68 1 G/C3 4 4 90 350 01 1
8 ROP MWD 68 1 FPHR 4 4 90 810 01 1
-------
32
#
.0
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
o
2.65
.000
(
(
SANDSTONE
72.0
133.0
72.0
72.0
2.400
1.350
2.600
3.000
BLAND
10.10
39.0
8.9
400
5.6
8.500
1768.0
TOOL NUMBER
P0335CRNDG6
P0335CRNDG6
P0335CRNDG6
P0335CRNDG6
47.8
55.4
2.19A/2.05
3.93 /1.37
MEMORY
9940.0
9499.0
9866.0
o
27-FEB-95
NEUTRON TOOL
MATRIX:
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
#
BOTTOM)
TOOL TYPE
ELECTROMAG. RESIS. 4
COMPENSATED NEUTRON
DUAL SOURCE DENSITY
DUAL GAMMA RAY
TOOL STRING (TOP TO
VENDOR TOOL CODE
EWR4
CNP
DSFD
DGR
$
#
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
9835.0
9813.0
9821.0
9828.0
START DEPTH
9521.0
9499.0
9507.0
9514.0
FILE HEADER
FILE NUMBER:
RAW MAD
Curves and log
MAD RUN NUMBER:
MAD PASS NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
DGR
EWR4
CNP
DSFD
$
header data for each pass of each run in separate files.
8
2
.5000
f
8
Tape Subfile 9 is type: LIS
(
(
("
#
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
2.65
.000
. 0
o
#
REMARKS: REPEAT SECTION 2 (MAD PASS 2) RUN AFTER MWD RUN 8.
$
#
CN ARCO ALASKA INC.
WN ALPINE #lA
FN WEST COLVILLE EXPLOR
COUN NORTH SLOPE
STAT ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
8 Curves:
API API API API
Log Crv Crv
Name Tool Code Samples Units Size Length Typ Typ CIs Mod
1 GR MWD 68 1 AAPI 4 4 90 310 01 1
2 RPX MWD 68 1 OHMM 4 4 90 120 46 1
3 RPS MWD 68 1 OHMM 4 4 90 120 46 1
4 RPM MWD 68 1 OHMM 4 4 90 120 46 1
5 RPD MWD 68 1 OHMM 4 4 90 120 46 1
6 NPHI MWD 68 1 PU-S 4 4 90 890 01 1
7 RHOB MWD 68 1 G/C3 4 4 90 350 01 1
8 ROP MWD 68 1 FPHR 4 4 90 810 01 1
-------
32
* DATA RECORD
(TYPE# 0) 1014 BYTES *
Total Data Records: 29
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth units
=
9900.000000
9495.000000
0.500000
=
= Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
Tape Subfile: 9
122129 datums
99 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
('
(
Tape Subfile 10 is type: LIS
95/ 6/23
01
**** REEL TRAILER ****
95/ 6/23
01
Tape Subfile: 10
2 records...
Minimum record length:
Maximum record length:
132 bytes
132 bytes
End of execution: Fri 23 JUN 95 3:28p
Elapsed execution time = 21.86 seconds.
SYSTEM RETURN CODE = 0
I