Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout205-022CAUTION: This email originated from outside the State of Alaska mail system.
Do not click links or open attachments unless you recognize the sender and know
the content is safe.
From:Wallace, Chris D (OGC)
To:AOGCC Records (CED sponsored)
Subject:FW: NOT OPERABLE: Produced Water Injector MPU K-22 (PTD# 205022)
Date:Tuesday, January 10, 2023 9:26:00 AM
From: Jerimiah Galloway <Jerimiah.Galloway@hilcorp.com>
Sent: Friday, December 30, 2022 11:21 AM
To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: David Haakinson <dhaakinson@hilcorp.com>
Subject: NOT OPERABLE: Produced Water Injector MPU K-22 (PTD# 205022)
Mr. Wallace,
Produced Water Injector MPU K-22 (PTD# 205022) will not be brought online due to operational
constraints at this time. The well is now classified as NOT OPERABLE for missing its 2018 regulatory
MIT-IA.
Please respond if there are any comments or concerns.
Jerimiah Galloway
MPU/Islands Well Integrity Engineer
Email: jerimiah.galloway@hilcorp.com
O: (907)564-5005
C: (828)553-2537
From: Jerimiah Galloway
Sent: Tuesday, December 20, 2022 8:06 AM
To: 'Wallace, Chris D (DOA)' <chris.wallace@alaska.gov>; Regg, James B (CED)
<jim.regg@alaska.gov>
Cc: David Haakinson <dhaakinson@hilcorp.com>
Subject: OPERABLE: Produced Water Injector MPU K-22 (PTD# 205022)
Mr. Wallace,
Produced Water Injector MPU K-22 (PTD# 205022) was made NOT OPERABLE due to missing the
AOGCC witnessed MIT-IA November 2021. On 12/19/2021, a passing pre-injection MIT-IA was
conducted. The well is now classified as OPERABLE and will be returned to injection. Once injection
is stabilized, an AOGCC witnessed MIT-IA will be scheduled.
Please respond if there are any comments or concerns.
Jerimiah Galloway
MPU/Islands Well Integrity Engineer
Email: jerimiah.galloway@hilcorp.com
O: (907)564-5005
C: (828)553-2537
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
CAUTION: This email originated from outside the State of Alaska mail system.
Do not click links or open attachments unless you recognize the sender and know
the content is safe.
From:Wallace, Chris D (OGC)
To:AOGCC Records (CED sponsored)
Subject:FW: OPERABLE: Produced Water Injector MPU K-22 (PTD# 205022)
Date:Tuesday, December 20, 2022 9:34:53 AM
From: Jerimiah Galloway <Jerimiah.Galloway@hilcorp.com>
Sent: Tuesday, December 20, 2022 8:06 AM
To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: David Haakinson <dhaakinson@hilcorp.com>
Subject: OPERABLE: Produced Water Injector MPU K-22 (PTD# 205022)
Mr. Wallace,
Produced Water Injector MPU K-22 (PTD# 205022) was made NOT OPERABLE due to missing the
AOGCC witnessed MIT-IA November 2021. On 12/19/2021, a passing pre-injection MIT-IA was
conducted. The well is now classified as OPERABLE and will be returned to injection. Once injection
is stabilized, an AOGCC witnessed MIT-IA will be scheduled.
Please respond if there are any comments or concerns.
Jerimiah Galloway
MPU/Islands Well Integrity Engineer
Email: jerimiah.galloway@hilcorp.com
O: (907)564-5005
C: (828)553-2537
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility
is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
Kaitlyn Barcelona Hilcorp North Slope, LLC
GeoTechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: 907 564-4389
E-mail: kaitlyn.barcelona@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal
Received By: Date:
DATE: 05/17/2022
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL
MPU K-22 (PTD 205-022)
MFC 05/03/2022
Please include current contact information if different from above.
PTD:205-022
T36628
Kayla Junke Digitally signed by Kayla Junke
Date: 2022.05.18 10:07:24
-08'00'
•
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Wednesday,November 08,2017
TO: Jim Regg /
P.I.Supervisor y' it I e/i SUBJECT: Mechanical Integrity Tests
(( 66t HILCORP ALASKA LLC
K-22
FROM: Bob Noble MILNE PT UNIT K-22
Petroleum Inspector
Src: Inspector
Reviewed By:p,,
P.I.Supry
NON-CONFIDENTIAL Comm
Well Name MILNE PT UNIT K-22 API Well Number 50-029-23249-00-00 Inspector Name: Bob Noble
Permit Number: 205-022-0 Inspection Date: 11/7/2017
Insp Num: mitRCN171108052619
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well K-22 1Type Inj 1 W 'TVD 7023 Tubing 891 899 " 892 - 889
PTD 2050220
Type Test SPT ,Test psi 1756 IA 68 2015 1970 - 1962
"
BBL Pumped: 2.3 BBL Returned: 2.2 ' OA 137 458 - 440 429
Intervals 4YRTST P/F P
Notes:
'CANNED F*R 2
Wednesday,November 08,2017 Page 1 of 1
· .
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~ 05 - () d ~ Well History File Identifier
Organizing (done)
o Two-sided 1111111111111111111
o Rescan Needed 1111111111111111111
RESCAN
~color Items:
~reYSCale Items: \ f~
o Poor Quality Originals:
DIGITAL DATA
~iskettes, No.d-..
o Other, No/Type:
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
o Other:
o Logs of various kinds:
NOTES:
Dale & Irð /0 7
I I
o Other::
BY: ~
151
mp
Project Proofing
1111111111111111111
Scanning Preparation
151
mf
BY: ~
+ ~ U = TOTAL PAGES '6£+
~nt does not include cover sheet)
151
~
BY:
Date:
Production Scanning
1111111111111111111
Stage 1
Page Count from Scanned File: ~ Ò (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: ~ES
~ Date: b 1131 0 7
If NO in stage 1, page(s) discrepancies were found: YES
NO
BY:
Isl
(Y1f
NO
Stage 1
BY:
Maria
Date:
Isl
1111111111111111111
Scanning is complete at this point unless rescanning is required.
ReScanned
1111111111111111111
BY:
Maria
Date:
151
Comments about this file:
Quality Checked
11I1111111111111111
10/6/2005 Well History File Cover Page.doc
• •
by
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
December 30, 2011
SLANNEi J FEB
Mr. Tom Maunder 9..,,
Alaska Oil and Gas Conservation Commission • ' 2:2-- 333 West 7 Avenue
Anchorage, Alaska 99501 V' �,_
Subject: Corrosion Inhibitor Treatments of MPK -Pad
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from MPK -Pad
that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
Mehreen Vazir
BPXA, Well Integrity Coordinator
• •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10 -404)
MPK
10/2912011 1
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor!
Well Name PTD # API # cement pumped cement date inhibitor sealant date
ft bbls ft • al
MPK -02 1960810 50029226750000 0.2 NA 0.2 NA 5.1 9/5/2011
MPK -05 1960680 50029226700000 1.9 NA 1.9 NA 17.9 8124/2011
MPK-06 1961910 50029227250000 1.5 NA 1.5 NA 8.5 812712011
MPK-09 2050140 50029232470000 1.9 NA 1.9 NA 12.8 8/24/2011
MPK -13 1960400 50029226550000 1.7 NA 1.7 NA 14.5 8/24/2011
MPK -17 1960280 50029226470000 1 NA 1 NA 2.6 8/2412011
MPK -18A 1970270 50029227330100 4.6 NA 4.6 NA 23.8 8/27/2011
MPK -21A 2031620 50029227180100 0.4 NA 0.4 NA 6.9 10/29/2011
"-"", MPK -22 2050220 50029232490000 2 NA 2 NA 5.1 8/27/2011
MPK -25 1960320 50029228500000 4.2 NA 4.2 NA 30.6 8/24/2011
MPK-30 1961680 50029227110000 1.5 NA 1.5 NA 17.0 8/25/2011
MPK-33 1962020 50029227290000 1.7 NA 1.7 NA 15.3 8/24/2011
MPK -34 1961690 50029227120000 2.5 NA 2.5 NA 25.5 8/25/2011
MPK-37 1960760 50029226740000 2 NA 2 NA 17.0 8/24/2011
MPK -38 1960300 50029226490000 3.2 NA 3.2 NA 15.3 8/2512011
MPK -43A , 1970410 50029227380100 1.7 NA 1.7 NA 13.6 9/16/2011
NOT OPERABLE: MPK-22 (PTD~050220) Incapable of injection at this t~e Page 1 of 1
Regg, James B (DOA)
From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com]
~~ i~(~~Z~
Sent: Saturday, September 19, 2009 8:47 PM r'~ `%
To: NSU, ADW Well Integrity Engineer; Regg, James B(DOA); Maunder, Thomas E(DOA); MPU, Well
Operations Supervisor; MPU, Wells Ops Coord; MPU, Production Optimization Engineer; MPU,
Wells Ops Coord2; MPU, Area Manager; NSU, ADW Well Operations Supervisor; Engel, Harry R;
Rossberg, R Steven
Cc: NSU, ADW Well Integrity Engineer; Boeger, J Reed
Subject: NOT OPERABLE: MPK-22 (PTD#2050220) Incapable of injection at this time
All,
/
Well MPK-22 (PTD#2050220) 4-year regulatory compliance testing is due on 09/20/09. The produced water
injection on MPK-Pad will remain down through at least the end of the year. Since the well is incapable of ,
injection it has been reclassified as Not Operable and will remain shut-in until injection is restored.
Please call with any questions or concerns.
Thank you,
Torin Roschinger (alt. Anna Dube)
Well Integrity Coordinator
Office (907) 659-5102
Cell (406) 570-9630
Pager (907) 659-5100 Ext. 1154
~F~e"L9~~~~ ~`~,.~ ;i ~UI.~~J
11/5/2009
• •
~~~n:
..,
'• ~
03/01/2008
DO NUT PLACE.
ANY NEW MATERIAL
UNDER THIS PAGE
F:1LaserFict~\CvrPgs_InsertslMicrafilm Ma~,er.c~c
~ I ~
DATA SUBMITTAL COMPLIANCE REPORT
5/2/2007
~~~ 8 ~h.{}S-
API No. 50-029-23249-00-00
Permit to Drill 2050220
MD 8894
Well Name/No. MILNE PT UNIT KR K-22
Operator BP EXPLORATION (ALASKA) INC
TVD 7135 "../ Completion Date 4/21/2005
Completion Status 1WINJ
Current Status 1WINJ
UIC Y
REQUIRED INFORMATION
Mud log No
Samples No
Directional Survey Yes
~~,-_.~"--~._-"--- --
~~-~
DATA INFORMATION
Types Electric or Other Logs Run: MWD, GR, IFR/CASANDRA, RES, ASI, SCMT, GURO, CCl
Well Log Information:
(data taken from logs Portion of Master Well Data Maint
Name
Directional Survey
Directional Survey
S~es (¡..-b b.J "l
Interval e
Log Log Run OH/
Scale Media No Start Stop CH Received Comments
0 8894 Open 7nt2005 Definitive I
0 8894 Open 7nt2005 MWD
5 Col 3450 7930 Case 8/30/2005 ULTRA SONIC IMAGING I
lOG w/PDC GR
1-4 115 8894 Open 5/10/2006 ROP DGR EWR 8-Apr-
2005
1-4 115 7135 Open 5/10/2006 DGR EWR 8-Apr-2005
1-4 115 8894 Open 5/10/2006 CTN AlD DGR 8-Apr-2005
76 8273 Open 5/10/2006 GR, EWR4, ASI, CNP,
SlD, ROP PS1
76 8273 Open 5/10/2006
76 8842 Open 5/10/2006 I
i
I -
76 8842 Open 5/10/2006 GR ASI eNP SLD ROP J
76 8252 Open 5/10/2006 GR, ROP, FET, NPHI,
RHOS, PB1
76 8822 Open 5/10/2006 GR, ROP, FET, NCNT,
NPHI, RHOB
-~~- . --
Sample
Interval Set
Start Stop Sent Received Number Comments
Log/
Data
Type
Electr
Digital Dataset
Med/Frmt Number
o Asc
~
';"'ED
C Pdf
C Pdf
C Pdf
~
to
to . C Lis
D Lis
D lis
C Lis
13875 I nd u ction/Resistivity
13875 Induction/Resistivity
13875 I nd uction/Resistivity
13882 I nd uction/Resistivity
13882 LIS Verification
13883 LIS Verification
13883 Induction/Resistivity
13875 I nd uction/Resistivity
13875 I nd uction/Resistivity
Well Cores/Samples Information:
Name
Permit to Drill 2050220
MD 8894
TVD 7135
ADDITIONAL INFORMA:(ION
, f"'..
Well Cored? Y ~
Chips Received? YiN""
Analysis "rf1\¡
Received?
DATA SUBMITTAL COMPLIANCE REPORT
5/2/2007
Well Name/No. MILNE PT UNIT KR K-22
Operator BP EXPLORATION (ALASKA) INC
Completion Date 4/21/2005
Current Status 1WINJ
Completion Status 1WINJ
Daily History Received?
(0/N
L}/N
Formation Tops
e
API No. 50-029-23249-00-00
UIC Y
--~------
Comments:
Compliance Reviewed By: _
-lL
Date:
P-~ flit) ~"7
e
.
.
()1 c... é)OS - 0 d d
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West ih Avenue, Suite 100
Anchorage, Alaska 99501
May 1, 2006
RE: MWD Formation Evaluation Logs: MPK-22 & PB1,
AK-MW-3642743
MPK-22 & PBl:
Digital Log Images:
50-029-23249-00, 70
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES
OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro technical Data Center MB33
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date: ,~/ II ( Cb
I
~,
Signed: C~- _Qt-.
{,
'-
1'3~~
:;;OQ-Ò9~
.
.
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Cornm.
Attn.: Librarian
333 West 7th Avenue, Suite 100
Anchorage, Alaska 9950 I
April 12, 2006
RE: MWD Fonnation Evaluation Logs MPK-22 PBl,
AK-MW-3642743
1 LIS fonnatted Disc with verification listing.
API#: 50-029-23249-70
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petrotechnical Data Center MB33
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
Date: ó/st n {.
Signed: {!, ¿t
9DÕ -() ~ a..
~ '3 rt~
.
I 31Jt3
.
()~ ~O()d.
..
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
April 12, 2006
RE: MWD Formation Evaluation Logs MPK-22,
AK-MW-3642743
1 LIS formatted Disc with verification listing.
API#: 50-029-23249-00
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petrotechnical Data Center MB33
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
Date: s- /I")! 0"
Signed:
(l.lL-
.;lÐo -D~~ \~trt3
,
I STATE OF ALASKA ..
ALASKA L AND GAS CONSERVATION COM~ION
WELL COMPLETION OR RECOMPLETION REPORT AND ~Qfia Oil & Gas Coni, Commi§§í@n
Revision: ~'tart Injection v
RI::L;t:IVt::O
NOV 2 1 2005
1a. Well Status: D Oil DGas D Plugged D Abandoned D Suspended DWAG 1b. Well Class:
20AAC 25.105 20AAC 25.110 D Development D Exploratory
DGINJ 181 WINJ D WDSPL No. of Completions One Other D Stratigraphic 181 Service
2. Operator Name: 5. Date Camp., Susp., or Aband. 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 4/21/2005 205-022
3. Address: 6. Date Spudded 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 4/8/2005 50- 029-23249-00-00
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number:
Surface: 4/19/2005 MPK-22i
3661' NSL, 1987' WEL, SEC. 03, T12N, R11E, UM 8. KB Elevation (ft): 15. Field I Pool(s):
Top of Productive Horizon:
2425' NSL, 3531' WEL, SEC. 03, T12N, R11E, UM 62.45 Milne Point Unit! Kuparuk River
Sands
Total Depth: 9. Plug Back Depth (MD+ TVD)
1780' NSL, 4118' WEL, SEC. 03, T12N, R11 E, UM 8894 + 7135 Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation:
Surface: x- 584569 y- 6005796 Zone- ASP4 8894 + 7135 Ft ADL375133
TPI: x- 583041 y- 6004544 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit:
Total Depth: x- 582463 y- 6003893 Zone- ASP4 N/A MD
-- --- -- ------ 19. Water depth, if offshore 20. Thickness of Permafrost
18. Directional Survey DYes 181 No NI A MSL 1800' (Approx.)
21. Logs Run:
MWD , GR , IFR/CASANDRA , RES, ABI , SCMT , GYRO, CCL
2. CASING, LINER AND CEMENTING RECORD
CASING SETTING EPTH MD SETTING DEPTH TVD HOLE <~OuNT
SIZE WT. PER FT. GRADE TOP troTTOM lOP I troTrOM SIZE CEMENTING RECORD PULLED
20" 94# H-40 35' 114' 35' 114' 42" 260 sx Arctic Set (Approx.)
9-5/8" 40# L-80 35' 3535' 35' 3535' 12-1/4" 447 sx AS Lite, 327 sx 'G'
7" 26# L-80 33' 8090' 33' 7086' 8-3/4" 195 sx Class 'G'
4-1/2" 12.6# L-80 7942' 8894' 7049' 7135' 6-1/4" Uncemented Slotted Liner
23. Perforations op'en to Production (MD + TVD of Top and 24. T JBlNG
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2" Slotted Liner 3-1/2",9.3#, L-80 7949' 7844'
MD TVD MD TVD
7972' - 8644' 7056' - 7125' 25. ACID, FRACTURE, CEMENT SaUEEZE, ~C;.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 80 Bbls MeOh
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
October 19, 2005 Water Injection
Date of Test Hours Tested PRODUCTION FOR Oll-Bsl GAs-McF WATER-Bsl CHOKE SIZE I GAS-Oil RATIO
TEST PERIOD ...
Flow Tubing Casing Pressure CALCULATED + Oil -BSl GAs-McF WATER-Bsl Oil GRAVITY-API (CORR)
Press. 24-HoUR RATE
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None R8DMS 8Ft
.2 3 Z005
Form 10-407 Revised 12/20'f) n. ,. G I f.. ',', A· to NTINUED ON REVERSE SIDE
,.- K". ì \.
.( .",,',.'
~
28.
GEOLOGIC MARKERS
29.
RMATION TESTS
..
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
TKLB
7129'
6643'
None
TLGM
7178'
6675'
TKUP
7414'
6826'
TKUD
7414'
6826'
TKC1
8013'
7067'
30. List of Attachments: Post Rig Summary
31. I hereby certify that the f egoing is true and correct to the best of my knowledge.
Signed Title Technical Assistant
Date l \ - l CS -oS
MPK-22i
Well Number
Prepared By Name/Number:
Drilling Engineer:
Sondra Stewman, 564-4750
Walter Quay, 564-4178
205-022
Permit No. I A roval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state 'None".
Form 1 0-407 Revised 12/2003
Submit Original Only
.
.
MPK-22i
Milne Point Unit / Kuparuk River Sands
50-029-23249-00-00
205-022
Accept:
Spud:
Release:
Ri:
POST RIG WORK
05/04/05
PULL BPV. PULL BALL & ROD. PULL RHC BODY FROM 7789' MD. INITIAL SBHP.
OPEN SSD. SET JET PUMP (BP-1094, 13-X).
05/07/05
FLOW BACK WELL TO CLEAN UP LINER PRIOR TO TIE-IN
05/08/05
FREEZE PROTECT AFTER FLOW BACK TO TANK. PUMPED 60 BBLS MEOH DOWN IA AND 20
BBLS MEOH DOWN TBG.
05/17/05
RECOVERED JET PUMP FROM XD @ 7,742' MDSET (BP-1109, 10A) JET PUMP W/ SOFT-SET,
GAUGES
OS/21/05
FREEZE PROTECT. PUMPED 60 BBLS MEOH DOWN IA AND 20 BBLS MEOH DOWN TBG.
OS/28/05
PULLED (BP-1109, 10A) JET PUMP W/ GAUGES
06/04/05
PUMP 203 BBLS INHIBITED WATER DOWN IA. FREEZE PROTECT IA W/ 60 BBLS DIESEL. RAN 3
1/2" B-SHIFTING. CLOSED SLIDING SLEEVE @ 7719' SLM
06/05/05
MIT IA TO 3500 PSI. PASSED. BLEED IA DOWN TO 0 PSI
08/18/05
WELL SUPPORT TECHS RIGGED UP AND PRESSRUE TESTED THE FLOWLINE TO 3600 PSI.
TEST WAS GOOD.
09/19/05
PREP FOR AOGCC MIT-IA. INSTALL INTERGAL FLANGE & VALVE ON IA FOR MIT.
09/20/05
T/I/O=1200/290/250. (STATE WITNESS MIT IA BY JEFF JONES). MIT IA TO 2000 PSI. (PASSED).
PRESSURED IA TO 2000 PSI WITH 1.8 BBLS OF DIESEL. IA LOST 60 PSI IN FIRST 15 MINUTES &
o PSI IN SECOND 15 MINUTES FOR A TOTAL OF 60 PSI IN 30 MINUTES. BLEED IA PRESSURE
DOWN TO 300 PSI. FWP=1250/300/320. PUMP 5 BBLS DIESEL DOWN LINE TO FLUSH MAX
METER.
Milne Point MIT's
t .......
-
e
«MIT MPU E-26, E-29 MITIA 9-20-05.xls» «MIT MPU F-73 MITIA 9-20-05.xls» «MIT MftU;f(-22
MITIA 9-20-05.xls»
Bob,
The three wells E-26/ E-29/ F-73 were four year MIT's and K-22 was the Initial. You may already have
the information from the K-22 well.
Joe,
Had E-Mail issue yesterday that prevented this information being sent.
Thanks,
Mark O'Malley
ACT!MPU
Well Ops Coord.
Office: 670-3387 Cell: 659-0560
e-mail: omallemd@bp.com
0.,., \~~[...~¡¡;;;'\',
12'~ t;~\\"(j~'(\u;,,'
i':J)",,,l4·
MIT MPU E-26, E-29 MITIA
.. MIT MPU E-26, E-29 MITIA
Content-DescnptIon: 9-20-05.xIs
Content-Type:
Content-Encoding:
app lication/vnd.ms-excel
base64
Content-Description: MIT MPU F-73 MITIA 9-20-05.xls
MIT MPU F-73 MITIA 9-20-05.xls Cont,ent-Type: appIication/vnd.ms-excel
Cont1ent-Encoding: base64
Contl~nt-Description: MIT MPU K-22 MITIA 9-20-05.xls
MIT MPU K-22 MITIA 9-20-05.xls Contlmt- Type: application/vnd.ms-excel
Content-Encoding: base64
1 of I 9/27/20058:56 AM
~
MEMORANDUM
e
e
State of Alaska
.
Alaska Oil and Gas Conservation Commission
TO:
Jim Regg
P.I. Supervisor
~11 C¡13è/œ5'
DATE: Wednesday, September 21,2005
SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC
K-22
MILNE PT UNIT KR K-22
Src: Inspector
Reviewed By:
P.I. Suprv -5lJ,ß-
Comm
FROM:
Jeff Jones
Petroleum Inspector
NON-CONFIDENTIAL
Well Name: MILNE PT UNIT KR K-22 API Well Number 50-029-23249-00-00 Inspector Name: Jeff Jones
Insp Num: mitlJ050921085525 Permit Number: 205-022-0 Inspection Date: 9/20/2005
ReI Insp Num
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well K-22 ¡Type Inj. ¡wI TVD 7023 I IA I 290 2000 1940 , 1940 i
I
P.T. 2050220 ITypeTest i SPT I Test psi 1755.75 ! OA 250 380 340 i 320 :
I
INITAL P Tubing i 1200 1250 1250 ! 1250 I
Interval PIF ì
Notes 1 well house inspected; no exceptions noted.
Wednesday, September 21,2005
Page 1 of 1
,
e
e
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
OPERATOR:
FIELD I UNIT I PAD:
DATE:
OPERATOR REP:
AOGCC REP:
BP Exploration (Alaska) Inc.
Milne Point UnitlK-Pad
09/20/05
Jeff Rea
Jeff Jones
%
.t'~.
Email to:Winton_Aubert@admin.state.ak.us;Bob_Fleckenstein@admin.state.ak.us;Jim_Regg@admin.state.ak.us
I
Pass
Well
P.T.D.
Notes:
Well
P.T.D.
Notes:
Well
P.T.D.
Notes:
Well
P.T.D.
Notes:
Test Details:
TYPE INJ Codes
F = Fresh Water Inj
G = Gas Inj
S = Salt Water Inj
N = Not Injecting
TYPE TEST Codes
M = Annulus Monitoring
P = Standard Pressure Test
R = Internal Radioactive Tracer Survey
A = Temperature Anomaly Survey
D = Differential Temperature Test
INTERVAL Codes
I = Initial Test
4= Four Year Cycle
V = Required by Variance
T = Test during Workover
o = Other (describe in notes)
Notes:
If the test was not AOGCC witnessed, leave the "AOGCC REP:" box blank.
MIT Report Form
Revised: 06/19/02
MIT MPU K-22 MITIA 9-20-05.xls
."
I
~ 3 1/8" - 5M FMC
Wellhead: 11" x 3.5" 5M Gen 5
wI 3.5" TC-II T&B Tubing Hanger
CIW "H" BPV profile
20" x 34" insulated, 215 #Ift A-53 c:ÐLJ
95/8" 40 ppf L-80 BTC
7" 26# L-BO IBT-M casing
( drift ID = 6.151", cap = .0383 bpf)
(cap = .0264 bpf wi 3 112" tbg inside)
3.5" 9.3# L-80 IBT-M tubing
( drift ID = 2.867", cap = .0087 bpf )
Baker Tie Back Sleeve
Baker ZXP Liner Top Packer
Baker 7" x 5" HMC Liner Hanger
7" Weatherford Float Collar 8004'
7" Weatherford Float Shoe 8090'
DATE
MPK-22
/3535'1
W:
REV. BY COMMENTS
4/21/05
Lee Hulme Drilled and Completed - Doyon 14
On . DF elev. = 62.50' (Doyon 14)
Orig. GL. elev.= 30.72' (Doyon 14)
KOP @ 180'
Hole angle passes 50 degrees @ 6250'
Max angle in tubing = 75 degree
70 degrees at sliding sleeve
3.5" HES X-Nipple
(2.813" Pkg ID )
13004'
3.5" HES 'XO' Dura Sliding Sleeve
2.813" ID ( Opens down)
17742'1
3.5" HES X-Nipple
(2.813" Pkg ID )
17795'1
7 x 3.5" Baker Premier Packer
( 2.875" ID )
/7844'/
3.5" HES XN-Nipple
(2.813" Pkg ID, 2.75" No Go)
17899'/
WLEG wI 4.75 No-Go OD
17949'1
0'
22 jts - 41/2", 12.6#/ft Solid & Slotted Liner Rat hole
Btm HES 4 112" Float Shoe 8894'
6 1/8" Hole td @ 8894' (7135' tvd)
MILNE POINT UNJJ~
WELL MPK-22
API NO: 50-029-23249-00
BP EXPLORATION (AK)
A-1l1¥'H- ~ ~ It ç I t\t' ~ +.. I \ c""I <:'''cìq I('i Ç) ç <Çt' ç
08/30105
Scblumbepger
NO. 3460
Alaska Data & Consulting Services
2525 Gambe" Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Well Job# Loa Description Date BL Color D
Z-15 I 'S'd.- '.1£.'1" 11084273 PPROF W/DEFT/GHOST/CALlPER 07/08/05 1
L5-17A lcJ"/ -À.l3 11075898 MEM PPROF W/DEFT/GHOST 07/03/05 1
DS 04-26 I.~ ~--JN 11072873 PRODUCTION PROFILE 07/30/05 1
S-14A ').Öj,.f-Oll 10893047 LEAK DETECTION LOG 10/17/04 1
G-27 I :f\¡¡-If<s.. 10942221 MEM PPROF & IPROF 06/29/05 1
DS 05-20B ~ t'-j .- .J..) '1 10942220 MEM INJECTION LOG 06/26/05 1
E-37A 1. C ç - \'¡t 1.- 10928640 MEM PPROF, IPROF & WARMBACK 06/14/05 1
D-29 I ~ç- )..,rJ 11084274 RST 07/09/05 1 1 i .~;1 ~ .3
L2-28 /t~' r - ü j >- 11076453 RST 07/27/05 1 1 iJ;oo/
C-13A (q7-Jl.í~ 11075900 MCNL 07/05/05 1 1 i JJ.) r
OWDW-SW/IJ C '- ). 3 ð 10893096 RST-BORAX CHANNEL DETECTION LOG 03/24/05 1 1 jJ .1.}. (¡.
06-08A 1 q r- '1 )- 11062628 RST 05/17/05 1 1 13~;¡ 7
12-29 J ,Y'i - t,) '1- 11072867 RST 07/07/05 1 1 n :u.8
C-19BÀ\;":'- ût, 'r 10928632 MCNL 05/12/05 1 1 J? 2. ;;U/
G-21 HI\¡- /1 (,¡¡ 10942221 MCNL 06/29/05 1 1 I ~ 1 >~
F-02A ?.¢~--c ~(f.j 10928630 MCNL 05/08/05 1 1 13J..3;
03-33B )C5- - GIS 10913011 US IT PDC-GR 03/19/05 1 1 ,"',). ~ ).."
MPK·22 ~Ù5-:.. Ü)..2.. 10893106 USIT 04/20/05 1
C
.
.
BP Exploration (Alaska) Inc,
Petrotechnical Data Center LR2-1
900 E. Senson Blvd.
Anchorage, Alaska 99508
Date Delivered:
~) /
f~ :(,.~'\\ \ -~
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 995.g3-138 ..-.,') 'W"'. . '
ATTN: Beth / 2r~r / j"! //
I (f'
Received by: \f'f .'0>. U
I
Re: MPK-22 (205-022) injector...OK to begin injection
It
e
Harry,
Your message confinns our discussion regarding MPK-22. The operations report indicates that the
primary cementing operation was perfonned without problems and the pipe was moved throughout
the operation. When the bond log was run, there is an interpretation provided in the report. The
tubing and IA were reported to be satisfactorily pressure tested when the completion was run. Based
on my review, BP has satisfied the requirements to begin injection into the well.
After the well has "wanned" up the production people should contact the Inspector to arrange a
witnessed MIT. Conducting it within a week or so would be fine, although not necessary.
Conducting the witnessed MIT within the first month should be fine. Mutual convenience should
guide when that test is done.
Call or message with any questions/comments.
Tom Maunder, PE
AOGCC
Engel, Harry R wrote, On 8/25/2005 2:38 PM:
Jennifer et al...
I just spoke with Tom Maunder, AOGCC, regarding this injector. Tom reviewed the
completion report and found:
. it provides sufficent detail to support good cement quality
. Initial MIT's were conducted during the completion
Our field folks must notify the AOGCC inspectors to arrange a post MIT after injection
begins... .ususally within 1 week.
We need to confirm that the bond log was in fact submitted to the AOGCC.
Tom authorized injection into the well.
Harry
1 of 1
8/25/20053:03 PM
.
.
14-Jun-05
AOGCC
Helen Warman
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well MPK-22
Dear Dear Sir/Madam:
Enclosed is one disk with the *.PTT and *.PDF files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
8,894.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518'71 / ¡J j
Date ì J "'-~ ~~ li Signed Þ~J OiL
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Carl Ulrich
Survey Manager
Attachment(s)
fil.- )~r-~".:\.. L
.
.
14-Jun-05
AOGCC
Helen Warman
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPK-22 MWD
Dear Dear Sir/Madam:
Enclosed is one disk with the *.PTT and *.PDF files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
8,894.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518 <0 / /1 ¡)fl ¿ ¿ .
Date 7JrS-Z()(ì Signed ...~ (~
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Carl Ulrich
Survey Manager
Attachment(s)
hl~ ^cn"-~À-l...
A STATE OF ALASKA - RF
ALASKAllllfL AND GAS CONSERVATION COM~ION ' .*"''''
WELL COMPLETION OR RECOMPLETION REPORT AND LOG MAY 2; Ô 2005
,".~~<;:k;:¡ Q¡j F,; ¡ift¡; l;ï¡niL
1a. Well Status: D Oil DGas D Plugged D Abandoned D Suspended DWAG 1b. Well Class: fr(hm~~rjl}
20MC 25.105 20MC 25.110 D Development' 't:i'Explõ;atory
DGINJ IS! WINJ D WDSPL No. of Completions One Other D Stratigraphic IS! Service
2. Operator Name: 5. Date Camp., Susp., or Aband. 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 4/21/2005 / 205-022
3. Address: 6. Date Spudded 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 4/8/2005 , 50- 029-23249-00-00
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number:
Surface: /
4/19/2005 MPK-22i
3661' NSL, 1987'WEL, SEC. 03, T12N, R11E, UM 8. KB Elevation (ft): 15. Field I Pool(s):
Top of Productive Horizon:
2425' NSL, 3531' WEL, SEC. 03, T12N, R11 E, UM 62.45 Milne Point Unit I Kuparuk River
Sands
Total Depth: 9. Plug Back Depth (MD+ TVD)
1780' NSL, 4118' WEL, SEC. 03, T12N, R11E, UM 8894 + 7135 Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation:
8894 + 7135 .I Ft ADL375133
Surface: x- 584569 ~ y- 6005796' Zone- ASP4 /
TPI: x- 583041 y- 6004544 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit:
Total Depth: x- 582463 y- 6003893 Zone- ASP4 N/A MD
19. Water depth, if offshore 20. Thickness of Permafrost
18. Directional Survey IS! Yes DNa N/A MSL 1800' (Approx.)
21. Logs Run:
MWD , GR , IFRlCASANDRA , RES, ABI , SCMT , GYRO, CCL
22. CASING, LINER AND CEMENTING RECORD
CASING ::iETTING PEPTHMO·.·. ::iETTING l EPTH TVD HOLE AMOUNT
SIZE WT. PER FT. GRADE TOP I BOTTOM TOP . BOTTOM SIZE CEMENTING RECÓRD PUllED
20" 94# H-40 35' 114' 35' 114' 42" 260 sx Arctic Set (Approx.)
9-5/8" 40# L-80 35' 3535' 35' 3535' 12-1/4" 447 sx AS Lite, 327 sx 'G'
7" 26# L-80 33' 8090' 33' 7086' 8-3/4" 195 sx Class 'G'
4-1/2" 12.6# L-80 7942' 8894' 7049' 7135' 6-1/4" Uncemented Slotted Liner
23. Perforations 0Ren to Production (MD + TVD of Top and 24. TUBING. RECORD
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2" Slotted Liner 3-1/2", 9.3#, L-80 7949' 7844'
MD TVD MD TVD
7972' - 8644' 7056' - 7125' -' 25. ACID,fRAC:;f'ljRE,GEMENT SQU!:E!?E, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 80 Bbls MeOh
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
Not on Production " N/A
Date of Test Hours Tested PRODUCTION FOR Oll-BSl GAs-McF W A TER-BSl CHOKE SIZE GAS-Oil RATIO
TEST PERIOD ...
Flow Tubing Casing Pressure CALCULATED ... Oll-Bsl GAs-McF W A TER-BSl Oil GRAVITY-API (CORR)
Press. 24-HoUR RATE
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none",
None .J RBDMS BFL MAY 2 [} 2005 r[i"f
¿j.:.1:1.-:S?$_
7Þ'~".. GF
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
28. GEOLOGIC MARKERS 29. ORMATION TESTS
Include and briefly summarize test results. List intervals tested,
NAME MD TVD and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
TKLB 7129' 6643' None
TLGM 7178' 6675'
TKUP 7414' 6826'
TKUD 7414' 6826'
TKC1 8013' 7067'
30. list of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys, Well Service Report and a Leak-Off Test
Summary.
end correct to the best of my knowledge.
Signe
Title Technical Assistant
Date
MPK-22i
Well Number
Prepared By Name/Number:
Drilling Engineer:
Sondra Stewman, 564-4750
Walter Quay, 564-4178
205-022
Permit No. I A roval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPK-22
MPK-22
DRILL+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 4/1/2005
Rig Release: 4/21/2005
Rig Number:
Spud Date: 4/8/2005
End:
4/8/2005 07:00 - 08:30 1.50 MOB P PRE PJSM, Skid rig floor
08:30 - 11 :00 2.50 MOS P PRE Move rig off MPK-09 and move to MPK-22, spot over well
11 :00 - 13:00 2.00 MOB P PRE Skid rig floor, spot rock washer, prep pits, rig accept @ 13:00
hrs 4/8/2005
13:00 - 17:30 4.50 MOB P PRE Nipple up diverter and Diverter lines, flow lines
17:30 - 19:30 2.00 MOB P PRE Picking up HWDpipe.and stand in derrick
19:30 - 20:00 0.50 MOB P PRE Perform Accumulator and Diverter test, the right to witness test
was waiver by Chuck Scheve AOGC. Test was witness by
WSL
20:00 - 21 :30 1.50 DRILL P SURF Pre Spud meeting, pick up Bit and motor, float sub
21 :30 - 22:00 0.50 DRILL P SURF Fill Stack, test lines, blow down top drive, Change out flow line
boot
22:00 - 23:00 1.00 DRILL P SURF Clean out ice 37' to 115'
23:00 - 00:00 1.00 DRILL P SURF Drill 115' to 222'
4/9/2005 00:00 - 00:30 0.50 DRILL P SURF Stand back HWP
00:30 - 02:30 2.00 DRILL P SURF Pickup MWD, Orient, and pickup DC
02:30 - 16:00 13.50 DRILL P SURF Drilling 222' to 1750' with 400 gpm, 1400 psi, 80 rpms, running
Gyro ever 100 ft. to 600'
16:00 - 17:00 1.00 DRILL P SURF Circ bottoms up, 400 gpm 1400 psi
17:00 - 18:00 1.00 DRILL P SURF Pumping out to HWDP with full drilling rate ( wet trip called BP
EMS @ 17:00)
18:00 - 19:00 1.00 DRILL P SURF Rig service, top drive
19:00 - 19:30 0.50 DRILL P SURF RIH, washed last stand to bottom
19:30 - 21 :00 1.50 DRILL P SURF Circ and raise mud wt to 10.5
21 :00 - 00:00 3.00 DRILL P SURF Drilling 1750' to 2100' with 427 gpm, 1000 psi, 80 rpms, AST
1.84, ART 8.1
4/10/2005 00:00 - 13:00 13.00 DRILL P SURF Drill 2100' to 3545' with 80 rpms 530 gpm 2800 psi, HyØrates
encountered @2250 cut mud from 10.5 to 9.5 no mud over
~\mWtíi, control drill 150 ft per hr, Hydrates 2600 to
2900',cut mud from 10.5 to 9.5 no mud over drilling nipple,
control drill 150 ft per hr, total of 3.5 bbls Lecithin"" mud
13:00 - 15:00 2.00 DRILL P SURF Circ., Two bottoms up with 530 gpm 2760 psi 80 rpms
15:00 - 17:00 2.00 CASE P SURF Pump out to 1700' with full drilling rate.
17:00 - 17:30 0.50 DRILL P SURF Circ out clay balls @ 1700'
17:30 - 18:30 1.00 DRILL P SURF Pump out to HWDP, 723'
18:30 - 19:30 1.00 DRILL P SURF RIH washed last stand to bottom 3545'
19:30 - 21:30 2.00 DRILL P SURF Circ, Three bottoms up 530 gpm, 2760 psi, 80 rpms
21 :30 - 00:00 2.50 DRILL P SURF Pump out to HWD pipe
4/11/2005 00:00 - 00:30 0.50 CASE P SURF Finish trip out to HWDP
00:30 - 02:30 2.00 CASE P SURF Stand back HWD pipe, lay down 8" flex DC, MWD, Motor
02:30 - 04:30 2.00 CASE P SURF PJSM, Rig up to pickup 9 5/8 csg
04:30 - 09:30 5.00 CASE P SURF PJSM, Picking up 9 5/8 40# L-80 STC csg, total 84 jts, Bridge
@ 600 ft worked thru, break circ @ 2460' due to thick mud"
Plu 175K, SIO 145K
09:30 - 10:00 0.50 CASE P SURF Land csg rig down franks tool, rig up cement head
10:00 - 12:00 2.00 CASE P SURF Circ 8 bbls min, 400 psi
12:00 - 15:00 3.00 CEMT P SURF Cement with Schlumberger, 5 bbls water, test line to 3,000
psi,20 bbls CW100, 50 bbls mud push Mixed @ 10.9, drop
bottom plug,254 bbls- 447 sxs. type ASL- Yield 3,20 Mixed @
11.5, tail with 327 sxs- 146 bbls DeepCRETE Cement 12.5ppg,
yield 2.51, drop top plug, kicked out with 30 bbls water, cement
was mixed and pumped 6 bbls min
15:00 - 16:00 1.00 CEMT P SURF Displace with rig pumps, 7 bbls min, 800 psi, bumped plug with
Printed: 4/25/2005 10:03:06 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPK-22
MPK-22
DRILL+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 4/1/2005
Rig Release: 4/21/2005
Rig Number:
Spud Date: 4/8/2005
End:
4/11/2005 15:00 - 16:00 1.00 CEMT P SURF 1850 psi, full return thru out job, 197 bbls good cement to
surface, Monitor well for 30 mins. no gas beaking out
16:00 - 19:00 3.00 CASE P SURF Rig down cement head, backed out landing jt, flush Diverter
and lines, lay down landing jt., lay down csg tools
19:00 - 20:00 1.00 CASE P SURF Nipple down Diverter
20:00 - 21 :00 1.00 CASE P SURF Nipple up Csg head, test metal to metal seal to 1000 psifor 10
min.
21 :00 - 23:30 2.50 CASE P SURF Nipple up Bop stack
23:30 - 00:00 0.50 CASE P SURF Rigging up to test bops
4/12/2005 00:00 - 01 :00 1.00 CASE P SURF Rigging up to test Bops, small amount of gas breaking around
conducter and hanger Smell bubbles first obServed @1900
hrs. have not increase
01 :00 - 04:30 ' 3.50 CASE P SURF Test Bops and manifold 250-3500 psi 5 min per test, hydrill
250-2500 psi 5 min per test, test was witness by Chuck Scheve
AOOCC, and WSL
04:30 - 05:30 1.00 CASE P SURF Install wear ring, and rig down test equipment
05:30 - 08:30 3.00 CASE P SURF Picking up drill pipe 75 jts from pipe shed stand back in derrick
08:30 - 09:00 0.50 CASE P SURF Moblize BHA - Change out 4" DP handling equipment
09:00 - 11 :00 2.00 CASE P SURF MU Bit - Motor - MWD - Orient - Con't WIDC's - HWT - Jars -
Surface test MWD
11 :00 - 12:00 1.00 CASE P SURF RIH with BHA - Picking up singles from pipe shed to 2152'
12:00 - 13:00 1.00 CASE P SURF Con't RIH from 2152' to 3415' tag float collar
13:00 - 14:00 1.00 CASE P SURF Break Circulation - CBU - 400 gp~ @1300psi
14:00 - 15:00 1.00 CASE SURF Rig up test equipment - T_;~'4'ØfOOO "slfor30 mins-
Record on chart - Rig down test equipment
15:00 - 16:00 1.00 DRILL P SURF Drill float equipment - 20' new hole - from 3545' to 3565'
16:00 - 17:00 1.00 CASE P SURF Pump sweep - Displace to New 9 ppg LSND mud
17:00 - 17:30 0.50 EV AL P SURF Rig up for FIT - MD 3545' - TVD 3533' - Mud weight 9 ppg -
Surface pressure 460 - EMW = 11.5 ppg- Rig down testing
equipment
17:30 - 00:00 6.50 DRILL P INT1 Directional Drill from 3565' to 4325' - WOB 5 - RPM 80 - TO on
3 - off 1 - GPM 550 - PP on 1950 - off 1840 - PU 130 - SO 120
- ROT 130
4/13/2005 00:00 - 14:00 14.00 DRILL P INT1 Directional Drill from 4325' to 5793' - WOB 8 to 10 - RPM 80 -
TO on 5 - off 3 - GPM 525 - PP on 2300 - off 2120 - PU 152-
SO 140 - ROT 148
14:00 - 15:00 1.00 DRILL P INT1 CBU 2 X - GPM 525 - PP 2120 - RPM 80 - TO 3
15:00 - 17:00 2.00 DRILL P INT1 Pump out to shoe from 5793' to 3489' - GPM 500 - PP 1900
17:00 - 17:30 0.50 DRILL P INT1 CBU 1 X - GPM 525 - PP 1540 - RPM 40
17:30 - 18:30 1.00 DRILL P INT1 RIH from 3530 to 5793' - Precauctionary wash last stand to
bottom
18:30 - 00:00 5.50 DRILL P INT1 Directional Drill from 5793' to 6273' - WOB 10 to 15 - RPM 80
- TO on 4 - off 2 - GPM 525 - PP on 3150 - off 2950 - PU 155-
SO 140 - ROT 150 - (Raise mud weight with 11.8 spike fluid
from 9.2 ppg to 10.1 ppg - MD 6188 TVD 6055 @ 23:00 hrs)
4/14/2005 00:00 - 00:00 24.00 DRILL P INT1 Directional Drill from 6273' to 7587' - WOB 10 to 15 - RPM 80 -
TO on 5.5 - off 4.5 - GPM 525 - PP on 3420 - off 3350 - PU
166 - SO 145 - ROT 155 - (Possible fault @ 7153/7778)
4/15/2005 00:00 - 12:30 12.50 DRILL P INT1 Directional Drill from 7587' to 8030' - WOB 10 to 15 - RPM 80 -
90 - TO on 5.5 - off 4.6 - GPM 525 PP on 3550 - off 3430 - PU
163 - SO 140 - ROT 154 - T.D. 83/4" hole
12:30 - 14:00 1.50 CASE P INT1 CBU 2 X - GPM 525 - PP 3440 - RPM 90 - TO 6
14:00 - 16:00 2.00 CASE P INn Pump out from 8090' to 5700' - Pump at 500 GPM - PP 3180
Printed: 4/25/2005 10:03:06 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPK-22
MPK-22
DRILL+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 4/1/2005
Rig Release: 4/21/2005
Rig Number:
Spud Date: 4/8/2005
End:
4/15/2005 16:00 - 17:00 1.00 CASE P INT1 CBU - GPM 500 - PP 2880 - RPM 80 - TQ 4
17:00 - 17:30 0.50 CASE P INT1 RIH from 5700' to 8090' - Precauctionary wash last stand to
bottom
17:30 - 19:30 2.00 CASE P INn CBU 3 X - GPM 525 - ICP 3650 - FCP - RPM 100 - TQ 5.5
19:30 - 23:00 3.50 CASE P INT1 Pump out from 8090' to 3500' - Pump at GPM 500
23:00 - 00:00 1.00 CASE P INT1 CBU 2 X - GPM 525 - RPM 40 - Lots of cuttings and clay over
shakers
4/16/2005 00:00 - 01 :00 1.00 CASE P INT1 Cut drlg line - Top drive service - Rig service
01 :00 - 02:00 1.00 CASE P INT1 Flow Check - Well static - Pump dry job - POH from 3500' to
715'
02:00 - 04:00 2.00 CASE P INT1 LD 5" HWT - BHA - Flush I Service motor break bit - LD motor
04:00 - 04:30 0.50 BOPSU P INT1 Pull Wear ring - Install test plug
04:30 - 06:00 1.50 BOPSU P INT1 COimge toþrams to 7" - Body test to250.1ow 1500 high 5 mins
each test
06:00 - 07:00 1.00 CASE P INT1 Rig Up Power Tongs And Equipment To Run 7" Casing
07:00 - 08:00 1.00 CASE P INT1 Have Safety Stand Down To Review Recent Injuries On The
Slope During The First Quarter
08:00 - 11 :30 3.50 CASE P INT1 Run In Hole With 7" Casing To The 9 5/8" Casing Float Shoe
At 3,534'
11 :30 - 12:00 0.50 CASE P INT1 Circulate One Casing Volume - Stage Up Pump Rates To 6
BPM With 570 Psi.
7" Casing String Pick Up Weight 130K - Slack Off Weight 125K
12:00 - 16:30 4.50 CASE P INT1 Continue To RIH With 7" 261b L-80 Casing From 3,534' To
8,090' With "No Problems" - Establish Circulation Every 30
Joints While Running In The Hole
16:30 - 17:30 1.00 CASE P INT1 Reciprocate 7" Casing While Circulating One Casing Volume
Atß6PM With 860 Psi.
7" Casing String Pick Up Weight 210K - Slack Off Weight 172K
17:30 - 18:00 0.50 CASE P INT1 Rig Down The Franks Fill Up Tool - Install Cement Head And
Circulating Lines
18:00 - 20:00 2.00 CASE P INT1 Circulate And Condition Mud At 6 BPM With 860 Psi. -
~rCasrng
20:00 - 21 :30 1.50 CEMT P INT1 Held PJSM With All Personal Regarding Cementing Operation
- Pump 5 BBLS Water - Test Dowell Lines And Equipment To
4,000 Psi. (Test Good) - Pump 10 BBLS CW-100, Followed Up
With 35 BBLS Mud Push Spacer Mixed At 11.0 PPG, Drop
Bottom Plug Pump 114.9 BelS (271 Sacks) 12.0 PPG Lead
Cement At 6.5 BPM. 41 BBlS (196 Sacks) 15.8 PPG Class
"G" Cement At 5.75 BPM, Drop Top Plug And Kick Out With 10
BBLS Water Thru Tub - Give To Rig For Displacement
21 :30 - 22:30 1.00 CEMT P INT1 Displace With 10.1 PPG LSND Mud At 6.5 BPM - With 272
BBLS Of mud Displacement Pumped, Swapped To Water And
Continued Displacement Pumping 25 BSLS - Slow Rate To 3.0
BPM With Final Circulating Pressure At 990 Psi. - Bump Plug
To 2000 Psi. With A Total Of 306 BBLS Pumped - Fidlßeturns
Thl'UDuratioo Of Job - Bleed Off Pressure And Verify Floats
Holding - Floats holding - Cement In Place At 22:20 Hours -
Aeciporocated pipe thru out job - Stopped recipl'oeðting string
last 10bbls pumped - PUW 210 - SOW 165 on last pipe
movement 20'
22:30 - 23:30 1.00 CASE P INT1 Flush stack - Close annular inject 50 bbls water to OA @ 3
bpmBOOpsi - Drain stack - Flow check - Well static
23:30 - 00:00 0.50 CASE P INT1 Split UNI-Head - Pick up stack - Run 70' of 1" pipe with blow
Printed: 4/25/2005 10:03:06 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPK-22
MPK-22
DRILL+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 4/1/2005
Rig Release: 4/21/2005
Rig Number:
Spud Date: 4/8/2005
End:
4/16/2005 23:30 - 00:00 0.50 CASE P INT1 down head make up to landing joint - Rig up hose's to void fluid
out of landing joint and 40' of 7" casing
4/17/2005 00:00 - 01 :00 1.00 CASE P INT1 Void 30' of 7" casg and landing joint to cut off 7" - Prepare to
set slips on 7"
01 :00 - 02:00 1.00 CASE P INT1 Pick up 7" string to 240K - Last string weight while
reciprocating pipe was 21 OK - set 30K on slips - Block weight
50K
02:00 - 03:00 1.00 CASE P INT1 Rig up Camron mechanical cutter - Cut 7" casg
03:00 - 05:00 2.00 CASE P INT1 Install FMC pack-off - NU BOP - test to 4300 psi for 10 mins-
Test good - Freeze protect OA with 70 bbls diesef - 2.5 bpm @
1340 psi - ShuHnpressure 1050 psi
05:00 - 07:30 2.50 CASE P INT1 Change 7" rams to 31/2" x 6" VBR - Install test plug - Test 3
1/2" x 6" VBR's 250 low 3500 high 5 mins each test - Pull test
plug - Install wear ring - Close annulus valves
07:30 - 08:30 1.00 CASE P INT1 MU 6 1/8" BHA
08:30 - 09:30 1.00 CASE P INT1 Upload MWD - Surface test GPM 225 - 770 psi - PJSM
handling nukes - Load nukes
09:30 - 10:00 0.50 CASE P INT1 Con't MU BHA
10:00 - 12:00 2.00 CASE P INT1 RIH from 230' to 5596'
12:00 - 13:00 1.00 CASE P INT1 Circ I Cond mud - GPM 225 - PP 900
13:00 - 14:30 1.50 CASE P INT1 RIH fom 5596' to 7994'
14:30 - 15:00 0.50 CASE P INT1 CBU 1 X - GPM 250 - PP 1710 - RPM 40
15:00 - 16:00 1.00 CASE P INT1 RU test equip - Test casg to 3500 psi - Hold for 30 mins -
Record on chart - RD test equip
16:00 - 17:30 1.50 DRILL P INT1 Drill float collar - Cement - Shoe - 20' New hole from 8090' to
8110'
17:30 - 18:30 1.00 CASE P INT1 CBU 1X - GPM 250 - PP 1910 - RPM 40
18:30 - 19:30 1.00 CASE P INT1 Displace LSND mud to 9 ppg FloPro mud
19:30 - 20:30 1.00 EVAL P INT1 Rig up test equip - Preform FIT - Mud weight 9 ppg - MD 8090'
- TVD - 7086' - Surface pressure 551 = EMW 10.5 ppg - RD
test equip - Blow down kil!l Choke lines - Choke manifold
20:30 - 00:00 3.50 DRILL P PROD1 Directional Drill from 8110' to 8222' - WOB 10 to 15 - RPM 80
- TQ on 5 - off 4 - GPM 275 - PP on 2100 - off 1920 - PU 147-
SO 125 - ROT 138
4/18/2005 00:00 - 02:30 2.50 DRILL P PROD1 Directional Drill from 8222' to 8324' - WOB 10 to 15 - RPM 80
- TQ on 5 - off 4 - GPM 250 - PP on 2100 - off 1920 - PU 147-
SO 125 - ROT 138
02:30 - 03:30 1.00 DRILL P PROD1 Pull back to 8200' for open hole sidetrack - Work trough for
open hole sidetrack from 8200' to 8222'
03:30 - 00:00 20.50 DRILL P PROD1 Side track @ 8200' to 8222' - Directional Drill from 8222' to
8565' - WOB 10 to 15 - RPM 80 - TQ on 3 - off 2 - GPM 250-
PP on 2310 - off 1980 - PU 140 - SO 131 - ROT 138
4/19/2005 00:00 - 11 :30 11.50 DRILL P PROD1 Directional Drill from 8565' to 8894' - WOB 10 to 150 - RPM 80 "
- TQ on 4 - off 3 - GPM 250 - PP on 2170 - off 1950 - PU 147-
SO 125 - ROT 136
11 :30 - 12:30 1.00 CASE P PROD1 CBU 2 X - GPM 300 - PP 2470 - RPM 100 - TQ 4 - Flow Check
- Well static
12:30 - 13:30 1.00 CASE P PROD1 Pump out from 8894' to 8090 - GPM 250 - PP 1960
13:30 - 14:00 0.50 CASE P PROD1 CBU 1 X @ 8070 - GPM 250 - PP 1870 - RPM 40 - Flow
check - well static
14:00 - 14:30 0.50 CASE P PROD1 RIH from 8070' to 8894' - Precauctionary wash last stand to
bottom
14:30 - 16:00 1.50 CASE P PROD1 CBU 3 X - GPM 300 - PP 2300 - RPM 100 - TQ 4 - Flow check
Printed: 4/25/2005 10:03:06 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPK-22
MPK-22
DRILL+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 4/1/2005
Rig Release: 4/21/2005
Rig Number:
Spud Date: 4/8/2005
End:
4/19/2005 14:30 - 16:00 1.50 CASE P PROD1 - Well static
16:00 - 16:30 0.50 CASE P PROD1 POH - From 8894' to 8070' - GPM 250 - PP 1850
16:30 - 17:30 1.00 CASE P PROD1 CBU 1 X - GPM 250 - PP 1800 - RPM 40 - Flow check - Well
static - Pump dry job
17:30 - 21 :00 3.50 CASE P PROD1 POH from 8070' - 995' - LD 24 jts 4" DP to pipe shed
21 :00 - 00:00 3.00 CASE P PROD1 LD BHA - PJSM Handling Nukes - Down load Nukes - Down
load MWD - Con't LD MWD - BHA
4/20/2005 00:00 - 00:30 0.50 CASE P PROD1 Clear rig floor
00:30 - 01 :30 1.00 CASE P PROD1 RU liner running equipment
01 :30 - 02:30 1.00 CASE P PROD1 PU 4 1/2" Slotted liner - Liner weight 12K - Pump through
hanger I packer
02:30 - 03:00 0.50 CASE P PROD1 Make up Hanger - ZXP packer to liner - Liner weight 12K
03:00 - 06:00 3.00 CASE P PROD1 Rih with 4 1/2" Slotted liner on 4" DP to 8090'
06:00 - 06:30 0.50 CASE P PROD1 Circ DP vol @ 3.5 bpm - 830 psi
06:30 - 07:00 0.50 CASE P PROD1 CON'T rih FROM 8090' TO 8894'
07:00 - 08:30 1.50 CASE P PROD1 Drop ball - Pump ball on seat @ 3.5 bpm @ 900 psi - PU 155
SO 137 - Ball on seat pressure up to 2000 psi set HMC Hanger
- Slack off 60K to verify hanger set - PU to 120K Rotate 10
turns to the right - Release setting tool - PU to verify release -
Slack off to 75K set ZXP packer - PU - Slack off 2nd time
rotating 10 RPM - Close Annular pressure up to 1500 psi on
annulus to verify packer set - Bleed off pressure - Open
Annular
08:30 - 10:00 1.50 CASE P PROD1 Displace 9 ppg FloPro mud to 8.5 ppg seawater - Pump 35 bbl
Hi-Vis spacer followed with 8.5 seawater to displace well -
Pump @ 10 bpm @ 2500 psi - Reciprocated pipe while
displacing
10:00 - 15:00 5.00 CASE P PROD1 POH Laying down 4" drill pipe
15:00 - 15:30 0.50 CASE P PROD1 Service break Baker Liner running tool - LD liner running tools
15:30 - 16:30 1.00 CASE P PROD1 Service Rig - Top Drive
16:30 - 18:00 1.50 CASE P PROD1 PJSM - Rig up Schlumberger Wireline tools
18:00 - 22:00 4.00 EVAL P PROD1 RIH with GRlSGMTICCLLogging tools - Log from 7930' to
3600' - (Excellent cementJrom 7930 to 6300 - marginal to fair
cemem,from6300 to 39Sð - No cement from 3950 to 3600) -
PQH with logging tools
22:00 - 22:30 0.50 CASE P PROD1 Rig down Lay down Schlumberger equipment and tools
22:30 - 23:00 0.50 RUNCO RUNCMP Pull wear ring - Rig up tubing equipment
23:00 - 00:00 1.00 RUNCO RUNCMP PJSM - (Running 3 1/2" completion) - PU I Run 3 1/2" 9.2#
L-80 IBT-M Tubing
4/21/2005 00:00 - 07:00 7.00 RUNCO RUNCMP PU I RUN 3 1/2" L-80 IBT-M 9.2# Completion
07:00 - 07:30 0.50 RUNCO RUNCMP Space out tubing - Land tubing with TWC installed in hanger
07:30 - 08:00 0.50 RUNCO RUNCMP RILDS - Test TWC to 1000 psi
08:00 - 08:30 0.50 RUNCO RUNCMP Clear rig floor
08:30 - 10:00 1.50 RUNCO RUNCMP ND BOP's
10:00 - 12:00 2.00 RUNCO RUNCMP NU FMC 11" x 3 1/16" 5M Adapter - Test pack off to 5K - NU
CIW 3 1/16" 5M Tree - Shell test tree to 5K with rig test pump-
Pull TWC with dry rod
12:00 - 15:00 3.00 RUNCO RUNCMP RU circulating lines - Test to 1200 psi - Pump down annulus 69
bbls seawater - 141 bbls seawater treated with corrosion
inhibitor @ 3 bpm 400 psi
15:00 - 17:00 2.00 RUNCO RUNCMP Rig up Lubricator - Test to 1000 psi - Rig up Little Red
Pumping services - Test lines to 4500 psi - Pump 90 bbls
diesel in annulus - @ 2.5bpm 800 psi at truck - final pressure
Printed: 4/25/2005 10:03:06 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPK-22
MPK-22
DRILL+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 4/1/2005
Rig Release: 4/21/2005
Rig Number:
Spud Date: 4/8/2005
End:
20:00 - 22:00
2.00 RUNCO
300 psi
U-tube diesel from annulus to tubing - Drop ball
RU Hot oil truck to tubing- Test Iirwsto4500 p6i - Pressure up
to 2500 psi on tubing to. set packer - fncrea-se to. 4000 p6i -
Ho.ld for 30 minBon Chart - Monitoring annulus pressure -
Ble~Qtf,to100psi - Rig hot oil truck to. annulus - Test lines to
4000 psi - Pressure up to 3500 psi - Hold for 30 mins on chart -
Monitoring tubing pressure - Bleed off pressure on annulus -
suck out lines
RUNCMP Rig down lubricator - Rig up Lubricator to install BPV - Install
BPV - Rig down lubricator - Suck o.ut all lines - Rig down test
lines and equipment - Secure well - Suck out cellar - Clear
cellar area - Release rig @ 22:00 hrs
Printed: 4/25/2005 10:03:06 AM
~ 3118"-5MFMC .
Wellhead' 11" x 3.5" 5M G
wI 3.5" TC-II T&B Tubing Hanger
CIW "H" BPV profile
MPK-22
20" x 34" insulated, 215 #/11 A-53 c:::DÐ
95/8" 40 ppf L-80 BTC
13535' I
7" 26# L-80 IBT-M casing
( drift ID = 6.151", cap = .0383 bpI)
(cap = .0264 bpf wI 3 1/2" tbg inside)
3.5" 9.3# L-80 IBT-M tubing
(drift ID = 2.867", cap = .0087 bpf)
Baker Tie Back Sleeve
Baker ZXP Liner Top Packer
Baker 7" x 5" HMC Liner Hanger
7" Weatherford Float Collar 8004'
7" Weatherford Float Shoe 8090'
DATE
REV. BY COMMENTS
4/21/05
Lee Hulme Drilled and Completed - Doyon 14
~~F elev. = 62.50' (Doyon 14)
.-.L. elev.= 30.72' (Doyon 14)
KOP @ 180'
Hole angle passes 50 degrees @ 6250'
Max angle in tubing = 75 degree
70 degrees at sliding sleeve
3.5" HES X-Nipple
(2.813" Pkg ID)
13004' 1
3.5" HES 'XD' Dura Sliding Sleeve
2.813" ID (Opens down)
17742' 1
3.5" HES X-Nipple
(2.813" Pkg ID)
17795' 1
7 x 3.5" Baker Premier Packer
( 2.875" ID )
17844' I
3.5" HES XN-Nipple
(2.813" Pkg ID, 2.75" No Go)
17899' 1
WLEG wI 4.75 No-Go aD
17949' 1
22 jts - 41/2", 12.6#/11 Solid & Slotted Liner
0'
Rat hole
8tm HES 4 1/2" Float Shoe 8894'
6 1/8" Hole td @ 8894' (7135' tvd)
MILNE POINT UNIT
WELL MPK-22
API NO: 50-029-23249-00
BP EXPLORATION (AK)
WE'-L SERVICE REPORT
WELL
MPK-22
DATE
5/8/2005
AFE
MKD337432
JOB SCOPE
RWO CAPITAL
DAILY WORK
FREEZE PROT
KEY PERSON
LRS-BRENNY JASON
MINID
0"
DEPTH
OFT
UNIT
LRS 64
DAY SUPV
HULME
NIGHT SUPV
UNKNOWN
TTL SIZE
0"
DAILY SUMMARY
(Freeze Protect)
T/1/0=10010/220 Freeze Protect after flowback to tank. Pumped 60 bbls meoh down ia and 20 bbls meoh down tbg. Final
WH P=010/220
Init-> 100 0 220
TIME BPM BBLs FLUID TEMP TBG IA OA COMMENTS
09:00 start ticket, load meoh
10:25 miru, pt, pjsm, line up to pump down ia
10:44 1 sta rt meoh 30 100 0 220 start pumpina down ia
10:53 2 15 " " 500 220
11 :12 1.3 50 " " 1400
11 :16 shu 60 " " 1400
down shut down, rd, ru to tbg
11 :21 1 sta rt meoh 30 0 0 220 start pumping down tbg
11 :36 shu 20 " " 100 0 220
down shut down, rdmo
11 :59 end ticket
Final-> 0 0 220
I FLUID SUMMARY
80 bbls meoh
SERVICE COMPANY - SERVICE DAILY COST CUMUL TOTAL
LITTLE RED $705 $705
WAREHOUSE $2,880 $2,880
SCHLUMBERGER $0 $2,900
PEAK $0 $5,500
ASRC $0 $2,200
TOTAL FIELD ESTIMATE: $3,585 $14,185
Legal Name:
Common Name:
MPK-22
MPK-22
4/12/2005
4/17/2005
FIT
FIT
3,544.0 (ft)
7,086.0 (ft)
3,545.0 (ft)
8,090.0 (ft)
9.00 (ppg)
9.00 (ppg)
460 (psi)
560 (psi)
2,117 (psi)
3,873 (psi)
11.50 (ppg)
10.52 (ppg)
Printed: 4/25/2005 10:03:01 AM
Halliburton Sperry-Sun
Milne Point Unit
BPXA
Milne Point MPK
MPK-22
.
Job No. AKZZ0003642743, Surveyed: 19 April, 2005
Survey Report
13 May, 2005
Your Ref: API 500292324900
Surface Coordinates: 6005796.90 N, 584569.33 E (70· 25' 32.7471" N, 149· 18' 39.0555" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
.
Surface Coordinates relative to Project H Reference: 1005796.90 N, 84569.33 E (Grid)
Surface Coordinates relative to Structure Reference: 5998786.50 N, 652593.45 E (True)
Kelly Bushing Elevation: 62.45ft above Mean Sea Level
Kelly Bushing Elevation: 62.45ft above Project V Reference
Kelly Bushing Elevation: 62.45ft above Structure Reference
.pllr"r"y....ul1
DRIL..L..I NG SERVI c: ES
A· Hájiiburlon C omp;;;;
Survey Ref: svy1521
Halliburton Sperry-Sun
Survey Report for Milne Point MPK - MPK-22
Your Ref: API 500292324900
Job No. AKZZ0003642743, Surveyed: 19 April, 2005
BPXA
Milne Point Unit
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
0.00 0.000 0.000 -62.45 0.00 0.00 N O.OO·E 6005796.90 N 584569.33 E 0.00 CB-SS-GYRO
274.30 0.400 69.440 211.85 274.30 0.34 N 0.90 E 6005797.25 N 584570.22 E 0.146 -0.89
366.30 1.850 240.000 303.83 366.28 0.29 S 0.09W 6005796.61 N 584569.24 E 2.441 0.26
453.30 3.290 249.600 390.75 453.20 1.87 S 3.65W 6005794.99 N 584565.71 E 1.722 3.94 .
563.79 2.380 255.190 501.10 563.55 3.56 S 8.83W 6005793.24 N 584560.54 E 0.860 8.90 MWD+IIFR+MS+SAG
654.30 1.880 247.680 591.55 654.00 4.60 S 12.03 W 6005792.16 N 584557.36 E 0.632 11.96
750.41 1.090 261.540 687.62 750.07 5.34 S 14.39 W 6005791.40 N 584555.00 E 0.897 14.19
844.97 1.030 260.590 782.17 844.62 5.61 S 16.12W 6005791.11 N 584553.28 E 0.066 15.64
940.40 0.250 335.530 877.59 940.04 5.56 S 17.05 W 6005791.15 N 584552.35 E 1.042 16.30
1036.10 0.140 78.160 973.29 1035.74 5.34 S 17.02 W 6005791.36 N 584552.37 E 0.326 16.13
1132.07 0.220 63.500 1069.26 1131.71 5.24 S 16.74 W 6005791.47 N 584552.65 E 0.096 15.85
1228.80 0.560 66.600 1165.99 1228.44 4.97 S 16.14 W 6005791.75 N 584553.25 E 0.352 15.23
1324.36 0.680 94.020 1261.54 1323.99 4.82 S 15.15W 6005791.91 N 584554.24 E 0.331 14.40
1419.98 0.970 99.850 1357.15 1419.60 5.00 S 13.78 W 6005791.75 N 584555.60 E 0.315 13.52
1516.15 0.670 94.470 1453.31 1515.76 5.18 S 12.42 W 6005791.58 N 584556.97 E 0.322 12.64
1612.70 0.700 119.190 1549.86 1612.31 5.51 S 11.34 W 6005791.26 N 584558.05 E 0.305 12.07
1708.34 0.560 142.780 1645.49 1707.94 6.17 S 10.55 W 6005790.61 N 584558.85 E 0.305 11.94
1804.63 0.570 146.390 1741.78 1804.23 6.94 S 10.00 W 6005789.84 N 584559.41 E 0.038 12.06
1900.44 0.500 111.860 1837.58 1900.03 7.50 S 9.35W 6005789.30 N 584560.07 E 0.339 11.95
1996.60 0.560 128.230 1933.74 1996.19 7.94 S 8.59W 6005788.86 N 584560.83 E 0.169 11.70
2093.77 0.570 131.940 2030.90 2093.35 8.56 S 7.86W 6005788.25 N 584561.57 E 0.039 11.58 .
2189.69 0.310 109.950 2126.82 2189.27 8.97 S 7.26'/'1 6005787.85 N 584562.17 E 0.318 11 .42
2285.73 0.510 128.440 2222.86 2285.31 9.32 S 6.68·W 6005787.50 N 584562.76 E 0.247 11.23
2381.65 0.310 85.060 2318.78 2381.23 9.57 S 6.09W 6005787.27 N 584563.35 E 0.371 10.96
2478.28 0.450 329.820 2415.40 2477.85 9.21 S 6.02W 6005787.62 N 584563.42 E 0.669 10.67
2574.42 0.500 329.090 2511.54 2573.99 8.53 S 6.42W 6005788.30 N 584563.00 E 0.052 10.50
2671.07 0.500 336.780 2608.19 2670.64 7.78 S 6.81 IN 6005789.04 N 584562.61 E 0.069 10.28
2767.53 0.560 337.530 2704.64 2767.09 6.96 S 7.15W 6005789.86 N 584562.26 E 0.063 9.97
2861.14 0.550 335.530 2798.25 2860.70 6.13 S 7.51 W 6005790.69 N 584561.89 E 0.023 9.67
2955.46 0.670 335.110 2892.56 2955.01 5.21 S 7.93W 6005791.60 N 584561.46 E 0.127 9.36
3050.41 0.670 336.780 2987.51 3049.96 4.20 S 8.38W 6005792.61 N 584560.99 E 0.021 9.01
3146.84 0.260 31.700 3083.93 3146.38 3.49 S 8.49 W 6005793.31 N 584560.88 E 0.583 8.61
3242.91 0.480 34.640 3180.00 3242.45 2.98 S 8.15W 6005793.83 N 584561.22 E 0.230 8.01
3338.64 0.290 43.190 3275.73 3338.18 2.47 S 7.75W 6005794.34 N 584561.60 E 0.207 7.37
3435.60 0.450 24.680 3372.69 3435.14 1.95 S 7.43 W 6005794.87 N 584561.92 E 0.204 6.78
13 May, 2005 - 14:30
Page 2 of 5
Dri/lQuest 3.03.06.008
Halliburton Sperry-Sun
Survey Report for Milne PC)int MPK - MPK-22
Your Ref: API 500292324900
Job No. AKZZ0003642743, Surveyed: 19 April, 2005
BPXA
Milne Point Unit
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastin9s . Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3477.10 0.320 16.050 3414.19 3476.64 1.69 S 7.33W 6005795.13 N 584562.02 E 0.342 6.53
3622.95 0.060 325.780 3560.04 3622.49 1.23 S 7.26W 6005795.58 N 584562.09 E 0.196 6.17
3717.25 0.120 34.010 3654.34 3716.79 1.11 S 7.23W 6005795.71 N 584562.11 E 0.119 6.07
3813.19 0.060 302.590 3750.28 3812.73 1.00 S 7.22W 6005795.82 N 584562.13 E 0.141 5.98
3909.16 0.190 270.710 3846.25 3908.70 0.97 S 7.42 W 6005795.85 N 584561.92 E 0.149 6.11 .
4005.40 0.360 210.620 3942.48 4004.93 1.23 S 7.73W 6005795.58 N 584561.61 E 0.324 6.51
4100.91 0.380 216.130 4037.99 4100.44 1.74 S 8.07W 6005795.07 N 584561.28 E 0.043 7.11
4197.40 0.380 217.100 4134.48 4196.93 2.26 S 8.45 W 6005794.55 N 584560.90 E 0.007 7.74
4293.08 0.220 227.380 4230.16 4292.61 2.63 S 8.78W 6005794.17 N 584560.58 E 0.176 8.24
4387.90 0.200 206.370 4324.98 4387.43 2.91 S 8.99W 6005793.89 N 584560.38 E 0.083 8.57
4484.03 0.200 256.140 4421.11 4483.56 3.10 S 9.22W 6005793.70 N 584560.14 E 0.175 8.88
4580.01 0.060 242.480 4517.09 4579.54 3.16 S 9.43 W 6005793.63 N 584559.93 E 0.148 9.07
4675.98 0.140 263.170 4613.06 4675.51 3.20 S 9.59W 6005793.59 N 584559.77 E 0.090 9.22
4772.24 0.000 0.000 4709.32 4771.77 3.21 S 9.71 W 6005793.58 N 584559.66 E 0.145 9.31
4868.45 0.000 0.000 4805.53 4867.98 3.21 S 9.71 W 6005793.58 N 584559.66 E 0.000 9.31
4964.42 1.850 233.700 4901.48 4963.93 4.13 S 10.96 W 6005792.65 N 584558.42 E 1.928 10.85
5060.82 4.410 233.330 4997.73 5060.18 7.26 S 15.19W 6005789.47 N 584554.23 E 2.656 16.08
5157.38 7.170 234.600 5093.79 5156.24 12.97 S 23.08 W 6005783.67 N 584546.40 E 2.861 25.75
5252.87 9.800 232.020 5188.22 5250.67 21.43 S 34.34 W 6005775.09 N 584535.23 E 2.782 39.77
5347.54 12.640 232.600 5281.08 5343.53 32.68 S 48.92 W 6005763.67 N 584520.78 E 3.002 58.11
5442.93 17.060 234.280 5373.26 5435.71 47.19 S 68.59 W 6005748.93 N 584501.28 E 4.655 82.40 .
5539.45 21.450 231.500 5464.36 5526.81 66.46 S 93.90 W 6005729.38 N 584476.18 E 4.645 114.07
5635.48 25.270 232.430 5552.50 5614.95 89.89 S 123.90W 6005705.61 N 584446.45 E 3.996 152.01
5731.43 30.360 232.180 5637.34 5699.79 117.27 S 159.31W 6005677.84 N 584411.36 E 5.306 196.60
5826.27 34.520 233.450 5717.36 5779.81 147.98 S 199.85 W 6005646.66 N 584371.17 E 4.445 247.22
5922.32 37.260 231.180 5795.17 5857.62 182.42 S 244.38 W 6005611.72 N 584327.03 E 3.171 303.30
6017.65 40.300 232.500 5869.48 5931.93 219.29 S 291.33 W 6005574.32 N 584280.50 E 3.305 362.81
6113.30 44.790 233.500 5939.93 6002.38 258.18S 342.99 W 6005534.85 N 584229.29 E 4.747 427.14
6210.08 49.490 233.020 6005.74 6068.19 300.62 S 399.81 W 6005491.77 N 584172.95 E 4.870 497.68
6305.97 52.490 233.080 6066.09 6128.54 345.40 S 459.35 W 6005446.32 N 584113.92 E 3.129 571.80
6402.11 52.300 232.470 6124.76 6187.21 391.47 S 520.00 W 6005399.56 N 584053.80 E 0.540 647.61
6497.90 52.210 232.130 6183.40 6245.85 437.79 S 579.93 W 6005352.56 N 583994.40 E 0.296 723.07
6594.26 51.490 232.030 6242.92 6305.37 484.36 S 639.71 W 6005305.32 N 583935.15 E 0.752 798.58
6690.13 51.050 231.720 6302.90 6365.35 530.54 S 698.54 W 6005258.48 N 583876.84 E 0.524 873.13
6786.56 51.020 231.190 6363.54 6425.99 577.26 S 757.18 W 6005211.10 N 583818.74 E 0.428 947.91
13 May, 2005 - 14:30
Page 3 of 5
DrillQuest 3.03.06.008
Halliburton Sperry-Sun
Survey Report for MilnePoint MPK - MPK-22
Your Ref: API 500292324900
Job No. AKZZ0003642743, Surveyed: 19 April, 2005
BPXA
Milne Point Unit
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6882.83 50.790 230.520 6424.25 6486.70 624.42 S 815.13 W 6005163.28 N 583761.33 E 0.591 1022.47
6978.87 50.540 229.920 6485.13 6547.58 671.95 S 872.22 W 6005115.11 N 583704.79 E 0.549 1096.66
7075.47 50.200 229.090 6546.74 6609.19 720.26 S 928.79 W 6005066.16 N 583648.76 E 0.750 1171.00
7171.42 50.020 228.570 6608.28 6670.73 768.72 S 984.21 W 6005017.07 N 583593.89 E 0.456 1244.59 .
7267.78 50.050 228.270 6670.17 6732.62 817.74 S 1039.46 W 6004967.43 N 583539.21 E 0.241 1318.43
7363.94 50.050 228.360 6731.92 6794.37 866.76 S 1094.51 W 6004917.79 N 583484.71 E 0.072 1392.14
7459.88 51.740 228.950 6792.43 6854.88 915.94 S 1150.40 W 6004867.99 N 583429.38 E 1.825 1466.56
7555.81 56.740 231.330 6848.48 6910.93 965.77 S 1210.16W 6004817.48 N 583370.19 E 5.587 1544.27
7652.38 64.000 231.600 6896.19 6958.64 1018.02 S 1275.78 W 6004764.49 N 583305.16 E 7.522 1627.93
7746.02 70.690 231 .450 6932.24 6994.69 1071.76S 1343.40 W 6004709.99 N 583238.17 E 7.146 1714.06
7840.37 74.970 230.500 6960.08 7022.53 1128.51 S 1413.40 W 6004652.44 N 583168.80 E 4.637 1804.00
7935.12 75.270 230.730 6984.41 7046.86 1186.62S 1484.18W 6004593.54 N 583098.69 E 0.394 1895.42
8028.32 75.350 230.390 7008.05 7070.50 1243.89 S 1553.81 W 6004535.48 N 583029.72 E 0.363 1985.42
8072.69 75.280 229.340 7019.30 7081.75 1271.55S 1586.62 W 6004507.45 N 582997.22 E 2.295 2028.30
8118.47 79.010 228.270 7029.48 7091.93 1300.95 S 1620.20 W 6004477.67 N 582963.98 E 8.460 2072.91
8166.58 85.990 227.240 7035.76 7098.21 1333.00 S 1655.48 W 6004445.23 N 582929.06 E 14.663 2120.57
8200.00 88.200 227.520 7037.45 7099.90 1355.60 S 1680.04 W 6004422.35 N 582904.76 E 6.666 2153.95
8213.89 89.070 227.520 7037.78 7100.23 1364.97 S 1690.28 W 6004412.86 N 582894.63 E 6.263 2167.83
8261.85 86.670 228.070 7039.56 7102.01 1397.17 S 1725.78 W 6004380.26 N 582859.49 E 5.134 2215.75
8309.18 85.310 228.750 7042.87 7105.32 1428.51 S 1761.09W 6004348.53 N 582824.54 E 3.211 2262.96
8355.27 83.380 227.090 7047.42 7109.87 1459.24 S 1795.13 W 6004317.41 N 582790.85 E 5.512 2308.82 .
8404.92 83.070 222.710 7053.28 7115.73 1494.16 S 1829.92 yv 6004282.10 N 582756.46 E 8.782 2358.07
8455.11 83.920 221 .430 7058.96 7121.41 1531.17 S 1863.34W 6004244.71 N 582723.47 E 3.048 2407.72
8501.06 90.010 221.040 7061.39 7123.84 1565.66 S 1893.57 W 6004209.88 N 582693.63 E 13.281 2453.33
8549.84 91.760 220.820 7060.64 7123.09 1602.51 S 1925.52 W 6004172.67 N 582662.10 E 3.616 2501.81
8597.17 88.930 219.050 7060.36 7122.81 1638.80 S 1955.90 W 6004136.04 N 582632.13 E 7.052 2548.74
8646.00 85.600 215.800 7062.69 7125.14 1677.52 S 1985.53 W 6004096.99 N 582602.94 E 9.523 2596.78
8693.15 87.080 215.280 7065.70 7128.15 1715.81 S 2012.88 W 6004058.39 N 582576.02 E 3.326 2642.85
8742.38 88.920 215.360 7067.41 7129.86 1755.95 S 2041.32 W 6004017.93 N 582548.04 E 3.741 2690.98
8787.46 86.840 213.800 7069.08 7131.53 1793.04 S 2066.89 W 6003980.56 N 582522.89 E 5.766 2734.92
8827.07 88.280 215.250 7070.77 7133.22 1825.64 S 2089.32 W 6003947.70 N 582500.83 E 5.157 2773.52
~ 8894.00 88.280 215.250 7072.78 7135.23 ø 1880.27 S 2127.93 W 6003892.63 N 582462.85 E 0.000 2838.95 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
13 May, 2005 - 14:30 Page 4 of 5 DrillQuest 3.03.06.008
Halliburton Sperry-Sun
Survey Report for Milne Point MPK - MPK-22
Your Ref: API 500292324900
Job No. AKZZ0003642743, Surveyed: 19 April, 2005
BPXA
Milne Point Unit
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 227.280° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 8894.00ft.,
The Bottom Hole Displacement is 2839.63ft., in the Direction of 228.536° (True).
Comments
.
Measured
Depth
(ft)
8894.00
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
7135.23
1880.27 S
2127.93 W Projected Survey
Survey too/prOgram for MPK-22
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
563.79
0.00
563.55
563.79
8894.00
563.55 CB-SS-GYRO
7135.23 MWD+IIFR+MS+SAG
.
13 May, 2005 - 14:30
Page 5 of 5
DrillQuest 3.03.06.008
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
Submit to: Hm reQQ@¿admín.state.ak.us
aCQcc prudhoe bav@adm~n.state.ak.us
bob fieckenste;n@¿admín.state.ak.us
Contractor: Doyon Rig No.: 14 DATE: 4/12/2005
Rig Rep.: Huntington/Gouchenauer Rig Phone: 670-3270 Rig Fax: 670-3269
Operator: BP Op. Phone: 670-3268 Op. Fax: 670-3269
Rep.: Vaughn / Willoughby
Field/Unit & Well No.: MP K-22
Location: Section: 3
Operation: Drlg: XXXXXX
Test: Initial: XXXXXX
Test Pressure: Rams: 250/3500
1/28/04
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Well Sign
Dr!. Rig
Hazard Sec.
Size
13 5/8
3 1/2 x 6
2-7/8 x 5
Blind
31/8
31/8
31/8
MUD SYSTEM: Visual Test
Trip Tank P
Pit Level Indicators P
Flow Indicator P
Meth Gas Detector P
H2S Gas Detector P
Alarm Test
P
P
P
P
P
PTD # 205-022
Township: 12N
Workover:
Weekly:
Annular: 250/2500
TEST DATA
Test Result
P
P
P
Test Result
P
P
P
P
P
P
P
NA
UM
11E
Meridian:
Range:
Explor.:
Other:
Valves: 250/3500
FLOOR SAFETY VALVES:
Quantity Test Result
Upper Kelly 1 P
Lower Kelly 1 P
Ball Type 1 P
Inside BOP 1 P
CHOKE MANIFOLD:
Quantity Test Result
No. Valves 14 P
Manual Chokes 1 P
Hydraulic Chokes 1 P
ACCUMULATOR SYSTEM:
Time/Pressure Test Result
System Pressure 3000 P
Pressure After Closure 1700 P
200 psi Attained 39 sec P
Full Pressure Attained 3 min 28 sec P
Blind Switch Covers: All stations P
Nitgn. Bottles (avg): 4 @ 2250
Test Results
Number of Failures: Q Test Time: 4.5 Hours Components tested
Repair or replacement of equipment will be made within days. Notify the North Slope
Inspector 659-3607, follow with written confirmation to Superviser at: Hm rem:¡@¿admín.state.ak.us
Remarks:
MISC. INSPECTIONS:
Test Result
Location Gen.: P
Housekeeping: P
PTD On Location P
Standing Order Posted P
BOP STACK:
Quantity
1
1
1
1
1
2
1
o
BOP Test (for rigs)
BFL 1/28/04
24 HOUR NOTICE GIVEN
YES X NO
Date
Test start
04/11/05
0:00
Time
Finish
Waived By
6:00 AM
Witness Scheve/Willoughby
4:30
BOP Doyon 14 4-12-05.xls
Re: MPK-22 Change in Surface Casing Depth.
e
Subject: Re: MPK-22 Change in Surface Casing Depth
From: Thomas Maunder <tom_maunder@admin.state.ak.us>
Date: Mon, 04 Apr 2005 13:57:47 -0800
To: "Quay, Walter (Natchiq)" <QuayWD@BP.com>
cc: Fred Johnson <JohnsoFC@BP.com>
c7ûS -0 dd
Thanks Walter. Setting shallower is prudent based on the MPK-09 experience. Does Schrader have
hydrocarbon in this area of the field?? Likely not, otherwise it would be being developed. I will place
a copy of this message in the well file.
Good luck with the operations.
Tom Maunder, PE
AOGCC
Quay, Walter (Natchiq) wrote:
Tom,
As per our telephone conversation last week, the upcoming well MPK-22 would like to change the
planned surface casing depth from 4962' MD, (4962' TVD) to 3500' MD, (3500' TVD). This decision is
based in part due to the severity of the hydrate issue seen in MPK-09.
The casing/cementing program would change as follows:
MPK-22 Old MPK-22 New
Surface Csg 4962' MD 3500' MD
Surface Lead Slurry 477 bbls, 626 sx of 10.7 ppg (4.28 ft/sx) 254 bbls, 447 sx of 11.5 ppg
ASL(3.20 ft/sx)
Surface Tail Slurry 42 bbls 204 sx of 15.8 ppg (1.16 ft/sx) 146 bbls, 327 sx of 12.5 ppg
DeepCrete (2.51 ft/sx)
Basis Tail cement to the Base of the PF. 40% Excess over Gauge Hole
Lead Cement from Base PF to surface, 150% Excess over Gauge Hole
Intermediate Csg.
Intermediate Lead
Intermediate Tail
ppg (1.17 ft/sx)
7962' MD 7962' MD
None 93 Bbls, 219 sx of 12.0 ppg (2.38 ft/sx)
34 bbls, 167 sx of 15.8 ppg (1.17 ft/sx) 34 bbls, 167 sx of 15.8
Basis Lead Cement 500' above the top of Schrader Bluff. 40% Excess over Gauge Hole
Tail cement = 1000' MD above shoe. 40% Excess over Gauge Hole
Walter Quay
Quavwd@bp.com
(907)564-4178
(907)440-8632 - Cell
1 of 1
4/4/2005 1 :58 PM
@IT.i.W.ß\ìífE..
~ Uif\JU lb
.
¡'ñ\Un ¡ ~. þ .Æ.\ n
Id u LriJ II
.
.00... W. : nV·.. 7..i /;.r¡¡.:.. '.
\'. I ¡ I f\ \.
" 'U\\ u
'!-t ij' i\' ~
'0:!.).'uLrù
FRANK H. MURKOWSKI, GOVERNOR
"'IfASIiA OIL A5D GAS
CONSERVATION COMMISSION
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Fred Johnson
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Milne Point MPK-22i
BP Exploration (Alaska) Inc.
Permit No: 205-022
Surface Location: 3661' NSL, 1987' WEL, SEe. 03, T12N, RIlE, UM
Bottornhole Location: 1760' NSL, 4100' WEL, SEC. 03, T12N, RIlE, UM
Dear Mr. Johnson:
Enclosed is the approved application for permit to drill the above referenced service well.
This permit to drill does not exempt you from obtaining additional permits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty~four (24)
hours notice for a representative of the Commission to . ess any required test. Contact the
Commission's petroleum field inspector at (907) 6 9-3 7 ger).
S' ce e
DATED thiS,J day of February, 2005
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
.... ... .
1 a. Type of work II Drill o Redrill rb. Current Well Class o Exploratory 0 Development Oil o Multiple,¡one
ORe-Entry o Stratigraphic Test II Service 0 Development Gas o Single ZOl1e
2. Operator Name: 5. Bond: a Blanket o Single Well 11. Well Name and Number:
BP Exploration (Alaska) Inc. Bond No. 2S1OO302630-277 MPK-22i
3. Address: 6. Proposed Depth: / 12. Field I Pool(s):
P.O. Box 196612, Anchorage, Alaska 99519-6612 MD 8894' " TVD 7122' Milne Point Unit I Kuparuk River
4a. Location of Well (Governmental Section): 7. Property Designation: Sands
Surface: / ADL375133 .,
3661' NSL, 1987' WEL, SEC. 03, T12N, R11E, UM
Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date:
2465' NSL, 3497' WEL, SEC. 03, T12N, R11 E, UM 03/16/05
Total Depth: 9. Acres in Property: 14. Distance to Nearest Property:
1760' NSL, 4100' WEL, SEC. 03, T12N, R11 E, UM ./ 2560 '" 2075' "
4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation 15. Distance to Nearest Well Within Pool
Surface: x- 584569 ' y- 6005796 ¿ Zone- ASP4 (Height above GL): 62.5 feet 1670' away from MPK-37 /
16. Deviated Wells: Kickoff Depth: 300 feet" 17. Maximum Anticipated Pressures in psig (see 20 MC 25.035)
Maximum Hole Angle: 88 deQrees Downhole: 2968 . Surface: 2278 ,
18. li8$lng ....rogram: Specifications Setting Depth . Qu(~ntityOfCe~~nt
Size TOD ... . Bottom c.f..orsacks
Hole CasinQ WeiQht Grade CouplinQ Lenath MD TVD MD TVD (includinQ staae data)
42" 20· 92# H-40 Welded 115' Surface Surface 115' 115' 260 sx Arctic Set (ADDrox.)
12-1/4· 9-518· 40# L-80 BTC 4963' Surface Surface 4963' 4962' 626 sx AS Lite, 204 sx 'G'
8-314" 7" 26# L-80 BTC-M 7962' Surface Surface 7962' 7072' 167 sx Class 'G'
6-1/4· 4-1/2" 12.6# L-80 BTC 1032' 7862' 7043' 8894' 7122' Uncemented Slotted Liner
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill ANDRe-entry Op$rations)
Total Depth MD (ft): Total Depth TVD (ft): I Plugs (measured): I Effective Depth MD (ft): IEffective Depth TVD (ft):1 Junk (measured):
Casing LenQth Size Cement Volume MD TVD
r
i n
I inp.r
Perforation Depth MD (ft): IPerfOration Depth TVD (ft):
20. Attachments a Filing Fee, $100 o BOP Sketch a Drilling Program o Time vs Depth Plot o Shallow Hazard Analysis
o Property Plat o Diverter Sketch o Seabed Report a Drilling Fluid Program a 20 MC 25.050 Requirements
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Walter Quay, 564-4178
Printed Name Fred Johnson Title Senior Drilling Engineer
,--(JAd /1 U~ Date.z/Ít/oS- Prepared By Name/Number:
Signature Phone StY-SY2 7 Sondra Stewman, 564-4750
() Commission Use Only
Permit To Drill ,zz! API Number: .3 t./ '" I Permit APprOV% ikl ~ee cover letter for
Number: 2ôS- -0 50- Ot.!!l,.. J, 2- -- DC Date: :Þ 8rrí Ó other requirements
Conditions of Approval: Samples Required D Yes ~o Mud Log Required DYes ~o
;~E suffide~easures jI$es 0 ~o D;rectlonaJ Survey Required ~es D No
Other: 3Çá)·--· ~ ~ .~. \. \-\. \ \ ~ Q'i~~-\~~~\~()~'
j;~i' \ Í' '<tOM,. '\ "" "'''~ I 1>-,. \ . \0 \So . Dala t-Izt/ð(
JJ¡. ~~ ~ APPROVED BY
ADD roved B"'I" ~ THE COMMISSION
Form 1 0-401 R~d o.~ \ 'ubmitln Duplicate
., I
STATE OF ALASKA
ALASKA 0 L AND GAS CONSERVATION COMMI SION
PERMIT TO DRILL
20 AAC 25 005
&/;);)
¡
.
.
bp
I Well Name: I MPK-22 I
Kuparuk Horizontal Injector
Drilling and Completion Plan Summary
I Type of Well: I Kuparuk C Sand Horizontal Injector
Surface Location: 3,661' FSL and 1,987' FEL ,.
(As Built) Section 3, T12N, R11 E UM
E = 584,569' N = 6,005,796' .r
TO - In Kuparuk D 2,781' FSL and 3,142' FEL
Section 3, T12N, R11 E UM
E = 583,425.97' N = 6,004,904.76' Z = 6,942.5' TVD
T1 -- Top Kuparuk C1 2,465' FSL and 3,497' FEL
Section 3, T12N, R11 E UM
E = 583,075.00' N = 6,004,585.00 ' Z = 7,072.5 ' TVD
T4 - Upper Mid C1 1,985' FSL and 3,938' FEL
Section 3, T12N, R11E UM
E = 582,640.00,' N = 6,004,100.00 ' Z = 7107.5' TVD
T5 - BHL in Lower C1 1 ,760' FSL and 4,100' FEL /
Section 3, T12N, R11 E UM
E = 582,481.19' N = 6,003,873.28 Z = 7122.5' TVD
Distance to Property line 2,075'
Distance to nearest well 1,670' from MPK-37
AFE Number: I
Estimated Start Date: 116 Mar 05
I Ri~: I Doyon 14
Ri days to complete: I 15
Page 1
.
.
·10.1 before drilling the HRZ
6-1/8" Production Hole
/
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to DS-4 disposal site
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to
unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R.
Casing/Tubing Program
42in 20 in* 92# H-40 Welded 115 0' 115' 1 115'
12.25 in 9.625 in 40# L-80 BTC 4963' 0 4963' 1 4962'
8.75 in 7.0 in 26# L-80 BTC-M 7962 0' 7962' 1 7072'
6.125 4.5 12.6 L-80 BTC 1032 7862'/7043' 889417122
Cement Program:
Casin Size
Basis
9-5/8",40#, L-80, BTC Surface Casin
Tail cement = 500' MD above shoe. 40% Excess over Gauge Hole
Lead to surface. 40% Excess over Gauge Hole to PF, 150% Excess
over Gau e Hole from PF to Surface
10 bbl water
20 bbl CW 100
50 bbl of MudPush
477 bbl, 626 sx of ArcticSet Lite: 10.7 and 4.28 ft Isx
42 bbl, 204 sx "G" mixed at 15.8 Ibl al & 1.16 ft Isx
Total Cement
Volume: 519 bbl
Wash
S acer
Lead
Tail
Casin Size
Basis
Total Cement
Volume: 35 bbl
7",26#, L-80, BTC-M Intermediate Casin
Tail cement = 1000' MD above shoe. 40% Excess over Gau e Hole
Wash 5-bbl water
10 bbl CW 100
20 bbl of MudPush
35 bbl, 167sx "G" mixed at 15.8 Ibl al & 1.17 ft Isx
BHST =170°F from SOR
S acer
Tail
Tern
Page 2
.
.
Evaluation Program:
12-1/4" Section
Open Hole: · Surface Readout Gyro
· MWD/GR ./
· IFR/CASANDRA,
· Sperry InSite
8-3/4" Section · MWD/GR/RES ,r
· I FR/CASANDRA,
· Sperry InSite
Cased Hole: · GR/SCMT in PDC mode
6-1/8" Section
Open Hole: · MWD/GR/RES/RES (ABI) ,r'
· IFR/CASANDRA,
· Sperry InSite
Cased Hole:
Formation Markers:
Formation Tops MD TVD Pore Pressure EMW
(ft) (ft) (psi) (lb/gal)
BPRF 1698 1698 710 8.35
Top Uanu (TUZC) 4172 4173 1785 8.35
Top Schrader Na 4527 4528 1939 8.35
Schrader Bluff Oa 4652 4653 1993 8.35
Base Schrader Ob 4737 4738 2030 8.35
Top HRZ 6865 6483 2788 8.35
Top KalubiklBase HRZ(may be faulted out) 7100 6633 2853 8.35
Top Kuparuk D (hiahest RES readina) 7520 6898 2968 8.35
Top Kuparuk C1 7944 7068 2467 7.80
TD 8894 7122 2524 7.80
,..
./
Recommended Bit Program:
1
2
3
12.25"
8.75"
6.125"
o - 4963
4963' - 7962'
7962' - 8894'
4963' Baker Hughes MX-1
2999'
932' Hycalog DSX-111
Page 3
.
.
Well Control:
Intermediate/Production hole:
· Maximum anticipated BHP:
· Maximum surface pressure:
· Planned BOP test pressure:
· Integrity tests:
Kick tolerance:
· Integrity tests:
· Planned completion fluid:
2,968 psi at 6,897' TVD (Top of the Kuparuk D) ...
2,278 psi at (Based on a full column of gas at 0.1 psi/ft) ,
3,500 psi .../
FIT to 11.5 Ib/gal 20' below the 9-5/8" shoe.
67 Bbls with 10.0 Ib/gal mud at below the 9-5/8" shoe.
FIT to 10.5 Ib/gal 20' below the 7" shoe.
Kill Weight Brine with diesel cap.
Drilling Hazards & Contingencies:
· Large (1" to 2") Gravel has been encounterd in some K-Pad wells. High Vis Mud should be
utilized.
· Hydrates have been reported on K-Pad. Expected Depth for hydrates 2200' SS to 2900' SS. "
Keep the Mud as Cool as possible.
· Tight hole and stuck pipe due to clays and poor hole cleaning have occurred on K Pad wells.
Lost Circulation
Lost Circulation has been encountered in both the surface and production intervals.
· The surface interval incidents appear to result from higher MW (>1 0.5ppg) utilized for hydrate
issues. The higher MW did not effectively combat the hydrates and was eventually lowered to
TD and run casing.
· The lost circulation in the production intervals is associated with conductive faults. We do not
expect losses while drilling this well if there is good hole cleaning. If seepage and/or losses
occur, follow the LOST CIRCULATION DECISION MATRIX in the well plan.
Expected Pressures /
· All Formation are expected to be normally pressured: 8.35 ppg or less 7.8 ppg in the Kuparuk.
,
Pad Data Sheet
· Please Read the K-Pad Data Sheet thoroughly.
Hydrocarbons
· Hydrocarbons are possible in the Schrader Bluff interval. /
Faults
· Two (2) faults are mapped in the well. Fault #1 in the surface hole section at 4437' MD(4438'
TVD) in the lower Ugnu. Fault #2 is within the Kalubik shale @ 7179' MD (6683' TVD).
Neither fault are expected to cause issues,. Ensure safe distance from the upper fault when
setting surface casing.
Hydrogen Sulfide
· MPK Pad is not designated as an H2S Pad, H2S detected from Kuparuk wells on the pad:
MPK-06 20.9 ppm 3/2001 /
MPK-38 20.5 ppg 3/2001
Page 4
.
.
Anti-collision Issues
· MPK-22 passes the Major Risk Criteria. However, magnetic interference is expected down ot
as deep as 1700'. Therefore, a surface readout Gyro surveys will be required until clear of
magnetic interference.
Distance to Nearest Property
· MPK-22 is planned to be 2075 ft from the nearest Milne Point property line. ,/
Distance to Nearest Well Within Pool
· MPK-22 is 1670 ft from the nearest sand penetration in the MPK-37.
,/
Page 5
.
.
DRILL & COMPLETION PROCEDURE
Pre-Ria Operations
1 . The 20" conductor will be installed pre-rig.
Drillina:
1. MIRT and NU Diverter.
2. Function Test Diverter, PU 4" DP and BHA.
3. Drill 12-1/4" surface hole below the Schrader Bluff interval.
4. Run and cement 9-5/8" sruface casing.
5. ND diverter, install wellhead and NU/Test BOPE.
6. Drill 8-3/4" hole to intermediate casing point.
7. Run and cement 7" intermediate casing.
8. Drill 6-1/8" Horizontal Interval.
9. Run and set 4-1/2" Slotted Liner. '
1 O. Displace to Kill Wt Brine.
11. RU & run GR/SCMT
12. Run a 3-1/2" ESP Completion
13. ND BOP/NU Tree.
14. Freeze Protect With Diesel
15. RD & MO Doyon 14.
Page 6
TREE: 3-1/2" 5M
WELLHEAD: FMC Gen 5 11" 5M
TUBING HEAD: 11"
20",92 ppf H-40 Welded I xxxXI
9.625", 40 ppf BTC L-80 ~
3-1/2" 9.2 ppf, L-80, production tubing
Directional
KOP 300' MD
Max 7" well bore angle: 74° @ 7872' MD
7" 26 ppf, L-80, Btc-mod production casing
I 7962' I
MP
2i Proposed
27 Jan 05 WDQ Proposed Kuparuk Horizontallnjextor
DF ELEVA
62.5 Ft
3-1/2" X-Nipple
I XXXX' I
3-1/2" Sliding Sleeve
I XXXX' I
3-1/2" X-Nipple
I XXXX' I
I XXXX' I
I XXXX' I
7" X 3-1/2" Baker Packer
3-1/2" X Nipple
3-1/2" XN Nipple
WLEG
18894'
/
4-1/2" 12.6# L80 Slotted Liner
flIL~E POINT UNIT
API NO: XX-XXX-XXXXX-XX L2
API NO: XX-XXX-XXXXX-XX L 1
API NO: XX-XXX-XXXXX-XX
BP EXPLORATION (AK)
K-PAD
i ~r
\
~
~~------
Z1
o
¡r~
f't
~ Q
.. éf
-~-
I
28
VICINITY MAP
N.T.S.
NOTE S
1 0 · 2 1. DATE OF SURVEY: JANUARY 14, 1997.
3 0 0 4 2. REFERENCE FIELD BOOK: MP97-01 (09-12).
5 · · 6 3. ALASKA STATE PLANE COORDINATES ARE
7 0 0 8 ZONE 4, ALASKA, NAD 27.
9 · · 10 4. MPU K-PAD SCALE FACTOR IS: 0.99990812.
11 0 1-12 5. HORIZONTAL CONTROL BASED ON K PAD
13 · K-14 MONUMENTS K-1 NORTH AND K-2 SOUTH.
15 0 16 6. ELEVATIONS ARE BP MPU DATUM (M.S.L.).
17 · · 18 7. VERTICAL CONTROL IS BASED ON BRAIDEN
19 0 1-20 CAP AT WELL C-1, ELEVATION = 16.86',
21 · K-22 ESTABLISHED BY BOMHOFF & ASSOCIATES.
23 0 24
25 · 0 26
27 0 0 28
29 0 · 30
31 0 0 32
.33 · · 34
35 0 0 36
37 . · 38
39 0 0 40
41 0 0 42
43 0 0 44
----------
SURVEYOR'S CERTIFICATE
I HEREBY CERTIFY THAT I AM
PROPERL Y REGISTERED AND LICENSED
TO PRACTICE LAND SURVEYING IN
THE STATE OF ALASKA AND THAT
THIS PLAT REPRESENTS A SURVEY
MADE BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT ALL
DIMENSIONS AND OTHER DETAILS ARE
CORRECT AS OF JANUARY 14. 1997.
LOCA TED WITHIN PROTRACTED SEC. 3. T. 12 N.. R. 11 E., UMIAT MERIDIAN, AK.
WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION
NO. COORDINA TES COORDINA TES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS
Y=6,005,852.27 N. 9,909.77 70'25'33.294" 70.4259150' 28.4' 3,716' FSL
-14 X.. 584546.48 E. 5109.86 11-918'39.707" 149.3110297' 2009' FEL
/ -22 Y=6,005,796.90 N. 9,849.87 70'25'32.747" 70.4257631' 28.2' 3,661' FSL
X= 584569.33 E. 5109.90 14918'39.055" 149.31084P6· 1,987' FEL
LEGEND
... AS-BUILT WELL CONDUCTOR
. EXISTING WELL CONDUCTOR
o FUTURE PROPOSED WELL
F ROb'l AWN: JACOBS .
lllli. CHECKm O'HANLEY BP EXPLORATION
DAlE:
1/15 7
DRAWING- SHEET-
IotPUKAB MILNE POINT UNIT
1 !rn5~œo JOB ..¡,):
5,fALF: AS-BUlL T WELL CONDUCTORS 1 OF 1
0 FOR __110M JJ LOH ~MDUIfC)~ WELLS K-14 AND K-22
"1 CSf ,._ LoW ,.. 100'
1[ IIE'iISlON OIl< -. ..- --
-22i
lanne
K-21APB1
0.25 Mile Buffer
(Kuparuk
o
ø Abandoned
Gas Injector Or Gas Producer Shut-In
Miscible
Miscible
-$- Not Yet
Null/Ul'lllmowl"I
Oil Producer
.. Oii Producer Gas lift
Oil Producer
Oil Producer Shut·ln
Oil Producer Submersible
Oil
tit Oil
800
1600
flowing
Back for Redrili
¢-
Water
Water
Water
tit Water
COMPANY DETAJLS REFERENCE iNFORMATION SUR' lEY PROORAM Plan: MP.K~22 WPlO {Plan MPK-21/Platl MPK~22}
BP A.mocö ~Ë~¡~ Depth Fro Depth To Survey!P1an Tool Created By: Digital Business Client User Date: 2/9/2005
34.30 CB-GYRO-SS Clwdred, Date:
Enm S,,,,= ISCWSA 6¡Sû 1900,00 MWD+IFR+MS -
¡¡n¡;;¡,;,;:¡¡;;: Reviewed: Date:
WELL DETAILS
N""", +Ní-S +F)·W N_ ...... LWtud, LOI1gitw:ie SI",
III II Man MPK>22 ¡ 1042,0:2 W9i.62 60057%.90 58456933 70"25'3~t747N 149"lS'39,055W NlA
O¡j SECTION DETAILS
5/0 See !lID Inc Azi TVD +NI-S +EI-W DLeg TFac. VSec Target
I O.
2 23 t~
3
íiJõi 4
12 5 23
6 -,
7 :: -I MPK-22 TO Upper !Cup D
8
9 MP!C-22 TI top CI
II"µ' 10 ~ :: 1 ·1 ~~i~:
I!
12 :¡i -HJ¡ MPK-22 T4 UPP<'f Mid CI ~I
!3 ~
14 -i, 2839. MPK-22 T5 Lower CI
240
TARGET DETAILS
Nanw TVD +NI-S +EI-W Northing Basting Shape
, Uwer Kup D ... --
. ;~;;.;~
,
r;
§ 360"
0
'"
i, CASING DETAILS
0
ïJ No. TVD !lID Name Size
.~ I
>
1! 2
¡... 480" , 3 112"
I
.,/ ............................................... ~I
//:... .............
. ....
60 /' ....
II ..
I. ..'
~ '.... ..
'! ".
'~ , I ~ '/ [/
720 i/J~!'
I ................~
0 1200 2400 3600 4800
Vertical Sèction at 227.28" [l200fl/inj
COMPAl'.'Y DETAILS REFERENCE INFORMATION SURVEY PROGRAM PiAn, MPK·22 WPW (Plan MPK·22JP¡an MPK'22)
BP Amoco C~~~5 ,'~"m"' ¿ Deptl1 Fm rkpIh To SUI'\'e)'1Plan T",,' Creared By: Digítal Business Clîent User Dare: 2f9/200'5
~OO ã~:~ PI!U1I1ed; MPK~22 WPlO VHì8 f,~;¡"'~< Checked: Date:
625" P1anned; MPK~22 WPH} VI
WELL DETAILS
MmW +N!~ +Ef"W Northing """" w_ L_ "01
. PlanMPK"22 11042.62 1097.62 6OÐ5'ì'965M1 584569.33 7O~m2.i41N 149"18'39JJS5W N/A
,
,
" ¡; ~ I
FORMATION TOP DETAILS
-4""
No. TVDPatb MDPat!¡ Formation
1 ;/i 1 ¡ ¡PRF
.{. 2
+ 3
I 4 ,.k . "In"'''_
J I : 5
~¿' HI) 6 npf ::z
t7"'¡'/ 7 fa
; i; ; I 8 ·n
·8w 9
i i
'" 1'¡ \ i{
;§ ,
g i "I ~ J
::!:. \
+' ie'
':E: I~:I\ 1),/ ~ CASlNG DETAILS
~
~ ~; i i Nn. TVD MD Name Size
! , I
':E: -[2 ; I
] 'I ti 1 IJ I 1
j' ~j j 1 ì 2
:> 1/ i 3 4 lI2"
: i ,i~1
~ 7t:... .<' TARGET DETAILS
~F-< ¡"c' Name TVD +NI-S +E!-W Northing Easting Shape
II 1;/ tJ ¡I
iEid );, : BI1J9 -I ¡~~:: ~ I
I;c' 17 ; I - ::
,
·[6 t/ ! I 1\ :: ì~~oo
/1 ¡,~ I \ :: :~ l::
¡
) ; I 1\
7) Ii i7/ SECTION DETAILS
V? ¡// t' Soo MD !nc Azi TVD +NI-S +E!-W DLeg TFace VSec Target
,~
I I I 1
-200v " ; ¡ 1 2 ~ 23; i~'
k! 3
l' 4 i~~~:
5 23
6 ::
7 -I MPK-22 TO Upper Kill' D
8
9 :: MPK-22 Ti 1£11' Cl
1 10 1: -1
11 d
12 -HJ MPK-22 T4 Upper Mid Cl
-24"" 13 :ì
-2400 -2000 -1600 -1200 -800 14 MPK-22 T5 Lower Cl
W.
.
.
Sperry-SuD
BP Planning Report
Company:
Field:
Site:
Well:;
WeDpath:
Plan:
BP Amoco
Milne Point
M PtKPad
Plan MPK-22
Plan MPK-22
MPK-22 WP10
Date: 21912005 Time: 15:42:24 Page:
Co-ordinate(NE) Reference: Well: Plan MPK-22, True North
Vertieal (TVD) Reference: 34.3+28.262.5 .
Section (VS) Reference: Well (O.OON,O.00E,227.28Azi)
Survey Calculation Method: Minimum Curvature . Db: Oracle
Principal:
Yes
Date Composed:
Version:
Tied-to:
3/212004
108
From Well Ref. Point
Field: Milne Point
North Slope
UNITED STATES
Map System: US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
bggm2004
Site: M Pt K Pad
TR-12-11
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 27.90 ft
5994744.31 ft
583595.36 ft
Latitude:
Longitude:
North Reference:
Grid Convergence:
70 23 44.152 N
149 19 11.252W
True
0.64 deg
WeD:
Plan MPK-22
Slot Name:
WeD Position: +N/-S 11042.02 ft Northing: 6005796.90 ft Latitude: 70 25 32.747 N
+EI-W 1097.62 ft Easting : 584569.33 ft Longitude: 149 18 39.055 W
Position Uncertainty: 0.00 ft
Casing Points
TVD Diameter Hole Size Name
ft in in
4962.50 9.625 12.250 9 518"
7072.50 7.000 8.500 7"
7122.47 4.500 6.125 4 112"
Formations
MD .TVD FomÌations Uthology . Dip Angle Dip Direttion
ft ft deg deg
1697.77 1697.50 BPRF 0.00 0.00
4172.77 4172.50 Top Ugnu (TUZC) 0.00 0.00
4527.77 4527.50 Top Schrader Na 0.00 0.00
4652.77 4652.50 Schrader Bluff Oa 0.00 0.00
4737.77 4737.50 base Schrader Ob 0.00 0.00
6865.03 6482.50 top HRZ 0.00 0.00
7100.38 6632.50 Top Kalubik/Base HRZ(may be fa 0.00 0.00
7520.88 6897.50 Top Kuparuk D 0.00 0.00
7944.34 7067.50 Top Kuparuk C1 0.00 0.00
Targets
Map Map <-- Latitude -->
Name Destription TVD +N/-S +EI-W Northing Easting Deg Min Set
Dip. Dir. ft ft ft ft ft
MPK-22 Fault 1 4437.50 -153.00 -346.12 6005640.00 584225.00 70 25 31.242 N 149 18 49.208 W
-Polygon 1 4437.50 -153.00 -346.12 6005640.00 584225.00 70 25 31.242 N 149 18 49.208 W
-Polygon 2 4437.50 -692.68 -382.24 6005100.00 584195.00 70 25 25.935 N 149 18 50.267 W
-Polygon 3 4437.50 -943.32 -770.14 6004845.00 583810.00 70 25 23.469 N 149 19 1.643 W
-Polygon 4 4437.50 -692.68 -382.24 6005100.00 584195.00 70 25 25.935 N 149 18 50.267 W
-Plan out by 363.37 at 4437.50 -10.09 -12.03 6005786.67 584557.42 70 25 32.648 N 149 18 39.408 W
MPK-22 Fault 2 6682.50 -1313.49 -319.26 6004480.00 584265.00 70 25 19.829 N 149 18 48.419 W
-Polygon 1 6682.50 -1313.49 -319.26 6004480.00 584265.00 70 25 19.829 N 149 18 48.419 W
-Polygon 2 6682.50 -1569.25 -697.22 6004220.00 583890.00 70 25 17.314 N 149 18 59.502 W
-Polygon 3 6682.50 -2112.94 -378.33 6003680.00 584215.00 70 25 11.967 N 149 18 50.150 W
-Polygon 4 6682.50 -1569.25 -697.22 6004220.00 583890.00 70 25 17.314 N 149 18 59.502 W
-Plan out by 875.77 at 6682.50 -762.02 -999.59 6005023.67 583578.53 70 25 25.252 N 149 19 8.373 W
MPK-22 TO Upper Kup D 6842.50 -879.20 -1153.50 6004904.76 583425.97 70 25 24.099 N 149 19 12.887 W
-Plan hit target
MPK-22 T1 top C1 7072.50 -1195.00 -1508.11 6004585.00 583075.00 70 25 20.993 N 149 19 23.285 W
-Plan hit target
. .
Sperry-SuD
BP Planning Report
Company: Date: 2!9J2005 Time: 15:42:24 Page:
Field: Co-ordinate(NE) Reference: Well: Plan MPK-22. True North
Site: Vertical (TVD) Reference: 34.3+28.2 62.5
WeB: Seetion (VS) Reference: Well (O.ooN.O.ooE,227.28Az1)
WelJpath: Survey CaIeulation Method: Minimum Curvature Db:
Map Map <-- Latitnde --> <- Longltnde ->
TVD +N/-S +EI-W Northing Easting Deg MiD See Deg Min . See
ft ft ft ft ft
MPK-22 poly 7082.50 -1069.06 -971.59 6004717.00 583610.00 70 25 22.232 N 149 19 7.551 W
-Polygon 1 7082.50 -1069.06 -971.59 6004717.00 583610.00 70 25 22.232 N 149 19 7.551 W
-Polygon 2 7082.50 -860.12 -1228.27 6004923.00 583351.00 70 25 24.287 N 149 19 15.080 W
-Polygon 3 7082.50 -1076.41 -1646.78 6004702.00 582935.00 70 25 22.159 N 149 19 27.353 W
-Polygon 4 7082.50 -1782.59 -2169.87 6003990.00 582420.00 70 25 15.213 N 149 19 42.688 W
-Polygon 5 7082.50 -1946.60 -2259.74 6003825.00 582332.00 70 25 13.599 N 149 19 45.323 W
-Polygon 6 7082.50 -1959.70 -1985.85 6003815.00 582606.00 70 25 13.471 N 149 19 37.290 W
-Polygon 7 7082.50 -1485.23 -1491.39 6004295.00 583095.00 70 25 18.139 N 149 19 22.793 W
-Plan out by 582.20 at 7082.50 -1220.15 -1533.85 6004559.56 583049.55 70 25 20.746 N 149 19 24.040 W
MPK-22 T4 Upper Mid C1 7107.50 -1675.08 -1948.61 6004100.00 582640.00 70 25 16.270 N 149 19 36.201 W
MPK-22 T5 Lower C1 7122.50 -1900.00 -2110.00 6003873.28 582481.19 70 25 14.058 N 149 19 40.932 W
Plan Seetion Information
MD Ine! AzIm TVD +N/-S +EI-W DLS Bnild Turn· TFO Target
ft deg deg ft ft ft deg/100ft deg/10Oft degl100ft deg
34.30 0.00 0.00 34.30 0.00 0.00 0.00 0.00 0.00 0.00
300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00
600.00 3.00 230.00 599.86 -5.05 -6.02 1.00 1.00 0.00 230.00
900.00 0.00 0.00 899.73 -10.09 -12.03 1.00 -1.00 43.33 180.00
4982.00 0.00 0.00 4981.73 -10.09 -12.03 0.00 0.00 0.00 0.00
6242.12 50.40 232.71 6085.48 -324.77 -425.31 4.00 4.00 -10.10 232.71
7429.86 50.40 232.71 6842.50 -879.20 -1153.50 0.00 0.00 0.00 0.00 MPK-22 TO Upper Kup D
7872.74 74.00 225.79 7047.77 -1134.85 -1446.27 5.50 5.33 -1.56 -16.31
7962.48 74.00 225.79 7072.50 -1195.00 -1508.11 0.00 0.00 0.00 0.00 MPK-22 T1 top C1
7982.48 74.00 225.79 7078.01 -1208.40 -1521.89 0.00 0.00 0.00 0.00
8109.59 88.81 222.08 7096.96 -1298.70 -1608.78 12.00 11.65 -2.92 -14.25
8616.80 88.81 222.08 7107.50 -1675.08 -1948.61 0.00 0.00 0.00 0.00 MPK-22 T4 Upper Mid C1
8771.34 86.17 213.18 7114.28 -1797.21 -2042.78 6.00 -1.71 -5.76 -106.69
8894.43 86.17 213.18 7122.50 -1900.00 -2110.00 0.00 0.00 0.00 0.00 MPK-22 T5 Lower C1
Survey
MD Sys TVD N/S EIW DLS MapN Map!
ft ft ft ft . deg/100ft ft ft
34.30 -28.20 0.00 0.00 0.00 6005796.90 584569.33 CB-GYRO-SS
100.00 37.50 0.00 0.00 0.00 6005796.90 584569.33 CB-GYRO-SS
200.00 137.50 0.00 0.00 0.00 6005796.90 584569.33 CB-GYRO-SS
300.00 237.50 0.00 0.00 0.00 6005796.90 584569.33 Start Dir 111 00
/ 400.00 337.49 -0.56 -0.67 1.00 6005796.33 584568.67 CB-GYRO-SS
500.00 2.00 230.00 499.96 437.46 -2.24 -2.67 1.00 6005794.63 584566.68 CB-GYRO-SS
600.00 3.00 230.00 599.86 537.36 -5.05 -6.02 1.00 6005791.79 584563.37 CB-GYRo-SS
700.00 2.00 230.00 699.77 637.27 -7.85 -9.36 1.00 6005788.94 584560.06 CB-GYRO-SS
800.00 1.00 230.00 799.73 737.23 -9.53 -11.36 1.00 6005787.24 584558.08 CB-GYRO-SS
900.00 0.00 0.00 899.73 837.23 -10.09 -12.03 1.00 6005786.67 584557.42 End Dir : 900'
1000.00 0.00 0.00 999.73 937.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRO-SS
1100.00 0.00 0.00 1099.73 1037.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRO-SS
1200.00 0.00 0.00 1199.73 1137.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRO-SS
1300.00 0.00 0.00 1299.73 1237.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRO-SS
1400.00 0.00 0.00 1399.73 1337.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRO-SS
1500.00 0.00 0.00 1499.73 1437.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRo-SS
1600.00 0.00 0.00 1599.73 1537.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRO-SS
1697.77 0.00 0.00 1697.50 1635.00 -10.09 -12.03 0.00 6005786.67 584557.42 BPRF
1700.00 0.00 0.00 1699.73 1637.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRO-SS
1800.00 0.00 0.00 1799.73 1737.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRO-SS
1900.00 0.00 0.00 1899.73 1837.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
2000.00 0.00 0.00 1999.73 1937.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
. .
Sperry-SUD
BP Planning Report
<'::òlD~Y: BP Aniocò .. Date: 219/2005 \Einîe: 15:42:24
Field: Milne POint . C..r~t~E)Rerennœ:
Site: MPtKead .. VertiCal (TVD)Refe~:
WeB: PlänMBK-22 SeÇtiQn (VS) Refennœ.: .
WeJ4Iath: PlänMBK-22 Su~ CalculatiOn MethOd: .
Survey
MD Incl A.ibn 'ß'D Sys 'ß'D NIS EIW
ft dêg dêg ft ft ft ft
2100.00 0.00 0.00 2099.73 2037.23 -10.09 -12.03 MWD+IFR+MS
2200.00 0.00 0.00 2199.73 2137.23 -10.09 -12.03 MWD+IFR+MS
2300.00 0.00 0.00 2299.73 2237.23 -10.09 -12.03 MWD+IFR+MS
2400.00 0.00 0.00 2399.73 2337.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
2500.00 0.00 0.00 2499.73 2437.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
2600.00 0.00 0.00 2599.73 2537.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
2700.00 0.00 0.00 2699.73 2637.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
2800.00 0.00 0.00 2799.73 2737.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
2900.00 0.00 0.00 2899.73 2837.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
3000.00 0.00 0.00 2999.73 2937.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
3100.00 0.00 0.00 3099.73 3037.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
3200.00 0.00 0.00 3199.73 3137.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
3300.00 0.00 0.00 3299.73 3237.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
3400.00 0.00 0.00 3399.73 3337.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
3500.00 0.00 0.00 3499.73 3437.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
3600.00 0.00 0.00 3599.73 3537.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
3700.00 0.00 0.00 3699.73 3637.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
3800.00 0.00 0.00 3799.73 3737.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
3900.00 0.00 0.00 3899.73 3837.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
4000.00 0.00 0.00 3999.73 3937.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
4100.00 0.00 0.00 4099.73 4037.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
4172.77 0.00 0.00 4172.50 4110.00 -10.09 -12.03 0.00 6005786.67 584557.42 Top Ugnu (TUZ
4200.00 0.00 0.00 4199.73 4137.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
4300.00 0.00 0.00 4299.73 4237.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
4400.00 0.00 0.00 4399.73 4337.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
4437.77 0.00 0.00 4437.60 4375.00 -10.09 -12.03 0.00 6005786.67 584557.42 MPK-22 Fault 1
4500.00 0.00 0.00 4499.73 4437.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
4527.77 0.00 0.00 4527.50 4465.00 -10.09 -12.03 0.00 6005786.67 584557.42 Top Schrader N
4600.00 0.00 0.00 4599.73 4537.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
4652.77 0.00 0.00 4652.50 4590.00 -10.09 -12.03 0.00 6005786.67 584557.42 Schrader Bluff
4700.00 0.00 0.00 4699.73 4637.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
4737.77 0.00 0.00 4737.50 4675.00 -10.09 -12.03 0.00 6005786.67 584557.42 base Schrader
4800.00 0.00 0.00 4799.73 4737.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
4900.00 0.00 0.00 4899.73 4837.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS
4962.77 0.00 0.00 4962.50 4900.00 -10.09 -12.03 0.00 6005786.67 584557.42 9 5/8"
4982.00 0.00 0.00 4981.73 4919.23 -10.09 -12.03 0.00 6005786.67 584557.42 Start Dir 4/100
5000.00 0.72 232.71 4999.73 4937.23 -10.16 -12.12 4.00 6005786.60 584557.33 MWD+IFR+MS
5100.00 4.72 232.71 5099.59 5037.09 -13.04 -15.90 4.00 6005783.68 584553.59 MWD+IFR+MS
5200.00 8.72 232.71 5198.89 5136.39 -20.12 -25.20 4.00 6005776.49 584544.36 MWD+IFR+MS
5300.00 12.72 232.71 5297.12 5234.62 -31.39 -40.00 4.00 6005765.06 584529.69 MWD+IFR+MS
5400.00 16.72 232.71 5393.82 5331.32 -46.78 -60.21 4.00 6005749.45 584509.66 MWD+IFR+MS
5500.00 20.72 232.71 5488.51 5426.01 -66.22 -85.74 4.00 6005729.72 584484.35 MWD+IFR+MS
5600.00 24.72 232.71 5580.73 5518.23 -89.61 -116.47 4.00 6005705.98 584453.90 MWD+IFR+MS
5700.00 28.72 232.71 5670.03 5607.53 -116.84 -152.23 4.00 6005678.35 584418.45 MWD+IFR+MS
5800.00 32.72 232.71 5755.98 5693.48 -147.78 -192.87 4.00 6005646.95 584378.17 MWD+IFR+MS
5900.00 36.72 232.71 5838.16 5775.66 -182.28 -238.17 4.00 6005611.95 584333.26 MWD+IFR+MS
6000.00 40.72 232.71 5916.17 5853.67 -220.16 -287.93 4.00 6005573.51 584283.94 MWD+IFR+MS
6100.00 44.72 232.71 5989.62 5927.12 -261.25 -341.90 4.00 6005531.81 584230.45 MWD+IFR+MS
6200.00 48.72 232.71 6058.16 5995.66 -305.35 -399.81 4.00 6005487.07 584173.04 MWD+IFR+MS
6242.12 50.40 232.71 6085.48 6022.98 -324.77 -425.31 4.00 6005467.37 584147.76 End Dir : 6242
6300.00 50.40 232.71 6122.37 6059.87 -351.79 -460.80 0.00 6005439.95 584112.59 MWD+IFR+MS
6400.00 50.40 232.71 6186.11 6123.61 -398.46 -522.11 0.00 6005392.58 584051.82 MWD+IFR+MS
6500.00 50.40 232.71 6249.84 6187.34 -445.14 -583.42 0.00 6005345.21 583991.05 MWD+IFR+MS
.
Sperry-Sun
BP Planning Report
.
6600.00 50.40 232.71 6313.58 6251.08 -491.82 -644.72 0.00 6005297.85 583930.28 MWD+IFR+MS
6700.00 50.40 232.71 6377.32 6314.82 -538.50 -706.03 0.00 6005250.48 583869.51 MWD+IFR+MS
6800.00 50.40 232.71 6441.05 6378.55 -585.18 -767.34 0.00 6005203.11 583808.74 MWD+IFR+MS
6865.03 50.40 232.71 6482.50 6420.00 -615.54 -807.21 0.00 6005172.31 583769.22 top HRZ
6900.00 50.40 232.71 6504.79 6442.29 -631.86 -828.65 0.00 6005155.74 583747.97 MWD+IFR+MS
7000.00 50.40 232.71 6568.52 6506.02 -678.54 -889.96 0.00 6005108.38 583687.20 MWD+IFR+MS
7100.00 50.40 232.71 6632.26 6569.76 -725.22 -951.27 0.00 6005061.01 583626.43 MWD+IFR+MS
7100.38 50.40 232.71 6632.50 6570.00 -725.40 -951.50 0.00 6005060.83 583626.20 Top KalubiklBa
7178.83 50.40 232.71 e682.50 6620.00 -762.02 -999.59 0.00 6005023.67 583578.53 MPK-22 Fault 2
7200.00 50.40 232.71 6696.00 6633.50 -771.90 -1012.57 0.00 6005013.64 583565.66 MWD+IFR+MS
7300.00 50.40 232.71 6759.73 6697.23 -818.58 -1073.88 0.00 6004966.28 583504.89 MWD+IFR+MS
7400.00 50.40 232.71 6823.47 6760.97 -865.26 -1135.19 0.00 6004918.91 583444.12 MWD+IFR+MS
7429.86 50.40 232.71 6842.50 6780.00 -879.20 -1153.50 0.00 6004904.76 583425.97 MPK-22 TO Up
7500.00 54.11 231.38 6885.42 6822.92 -913.32 -1197.21 5.50 6004870.16 583382.65 MWD+IFR+MS
7520.88 55.22 231.00 6897.50 6835.00 -924.00 -1210.49 5.50 6004859.33 583369.50 Top Kuparuk D
7600.00 59.43 229.67 6940.21 6877.71 -966.51 -1261.73 5.50 6004816.25 583318.75 MWD+IFR+MS
7700.00 64.76 228.15 6986.99 6924.49 -1024.58 -1328.29 5.50 6004757.42 583252.86 MWD+IFR+MS
7800.00 70.11 226.75 7025.36 6962.86 -1087.02 -1396.28 5.50 6004694.23 583185.59 MWD+IFR+MS
7872.74 74.00 225.79 7047.77 6985.27 -1134.85 -1446.27 5.50 6004645.84 583136.15 End Dir : 7872
7900.00 74.00 225.79 7055.28 6992.78 -1153.12 -1465.05 0.00 6004627.36 583117.57 MWD+IFR+MS
7944.34 74.00 225.79 7067.50 7005.00 -1182.84 -1495.60 0.00 6004597.30 583087.36 Top Kuparuk C
7962.48 74.00 225.79 7072.50 7010.00 -1195.00 -1508.11 0.00 6004585.00 583075.00 MPK-22 T1 top
7982.48 74.00 225.79 7078.01 7015.51 -1208.40 -1521.89 0.00 6004571.44 583061.37 Start Dir 12/10
7999.83 76.02 225.26 7082.50 7020.00 -1220.15 -1533.85 12.00 6004559.56 583049.55 MPK-22 poly
8000.00 76.04 225.26 7082.54 7020.04 -1220.26 -1533.96 12.00 6004559.45 583049.43 MWD+IFR+MS
8100.00 87.69 222.35 7096.67 7034.17 -1291.60 -1602.34 12.00 6004487.35 582981.88 MWD+IFR+MS
8109.59 88.81 222.08 7096.96 7034.46 -1298.70 -1608.78 12.00 6004480.17 582975.52 End Dir : 8109
8200.00 88.81 222.08 7098.84 7036.34 -1365.79 -1669.35 0.00 6004412.41 582915.72 MWD+IFR+MS
8300.00 88.81 222.08 7100.92 7038.42 -1439.99 -1736.35 0.00 6004337.45 582849.57 MWD+IFR+MS
8400.00 88.81 222.08 7103.00 7040.50 -1514.20 -1803.35 0.00 6004262.50 582783.42 MWD+IFR+MS
8500.00 88.81 222.08 7105.07 7042.57 -1588.41 -1870.35 0.00 6004187.55 582717.27 MWD+IFR+MS
8600.00 88.81 222.08 7107.15 7044.65 -1662.61 -1937.35 0.00 6004112.59 582651.12 MWD+IFR+MS
8616.80 88.81 222.08 7107.50 7045.00 -1675.08 -1948.61 0.00 6004100.00 582640.00 MPK-22 T4 Up
8700.00 87.38 217.29 7110.27 7047.77 -1739.05 -2001.70 6.00 6004035.44 582587.65 MWD+IFR+MS
8771.34 86.17 213.18 7114.28 7051.78 -1797.21 -2042.78 6.00 6003976.82 582547.24 End Dir : 8771
8800.00 86.17 213.18 7116.19 7053.69 -1821.15 -2058.43 0.00 6003952.71 582531.86
8894.00 86.17 213.18 7122.47 7059.97 -1899.64 -2109.76 0.00 6003873.65 582481.42
"' 8894.43 86.17 213.18 7122.50 ~ 7060.00 -1900.00 -2110.00 0.00 6003873.28 582481.19
WELL DETAILS
Name +N/·S +EI-W Northing Easting Latitude Longitude Slot
Plan MPK-22 11042.02 1097.62 6005796.90 5114569.:13 70"25'32.747N 149°18'39.055W N/A
ANTI·COLLISION SETTINGS
COMPANY DETAILS
BPAmoC(l
Interpolation MethodMD
Depth Range From: 34.30
Maximum Range: 1086.01
Intcrval: 25.00
To: 8894.43
Rcference: Plan: MPK-22 WPlO
Cakulation Method: Mjnimum Curvature
Error System: ISCWSA
Scan Method: Trav Cy!inder North
ElTorSurface: mlipticaJ+Casing
Warning Method: Rules Based
80
75
From Colour
34
500
1000
1500
2000
2500
3000
3500
4000
5000
6000
7000
8000
°IÒggg
1000
00
00
00
00
3
o
5
13
o 27
5
38
SURVEY PROGRAM
Depth Fm Depth To Survey/Plan
34.30 1900.00 Planned: MPK·22 W1'1O V!08
1900.00 8894.43 Planned: MPK-22 W1'IO V108
ToMD
500
1000
1500
2000
2500
3000
3500
4000
5000
6000
7000
8000
9000
10000
11000
12000
13000
14000
15000
16000
Too]
CB-GYRO-SS
MWD+IFR+MS
WELL1'AH¡ DETAILS
Plan M1'K-22
Rig:
Ref. DatlUU· 34.3+28.2 62.50fi
V.Section Origin Origin Starting
Angle +N/-S +Ef-W From TVD
227.28" 0.00 0.00 34.30
LEGb""ND
CASCADE-1A (CASCADE-IA), Major Risk
MPK..o2 (MPK..o2), Major Risk
M1'K..o5 (MPK..o5), Major Risk
MPK..{}6 (MPK..(Ió). Major Risk
MPK-J3 (MPK-D), Major Risk
MPK-17 (MPK-I7), Major Risk
MPK-18A(MPK-18A), ~ajor Risk
MPK-18 (MPK-18), Major Risk
M1'K-21 (MPK-21), Major Risk
MPK-2¡ (MPK·21A), Major Risk
MPK·21 (M1'K-21APBI), Major Risk
M1'K-25 (MPK-25), Major Risk
MPK-30 (MPK.30), Major Risk
M1'K-33 (M1'K-33), Major Risk
MPK-34 (MPK-34), Major Risk
MPK-37 (MPK-37), Major Risk
MPK-3S (MPK-38), Major Risk
MPK-38 (Plan MPK-38A), Major Risk
MPK-43A (MPK-43A), Major Risk
M1'K-43 (MPK-43), Major Risk
Plan MPK..fI9 (P]an MPK--(9), Major Risk
Plan MPK·22 (P]an MPK-22 o!d), NOERRORS
Plan MPK-22
MPK-22 WPIO
SECTION DETAILS
S" MD Ine Ad TVD +N/-S +EI·W Dug TFace VScc Target
1 34.30 0.00 0.00 34.30 0.00 0.00 0.00 0.00 0.00
2 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00
3 600.00 3.00 230.00 599.86 -5.05 -6.02 Loo 230.00 7.84
4 900.00 0.00 0.00 899.73 -10.09 -12.03 1.00 180.00 15.69
, 4982.00 0.00 0.00 4981.73 -10.09 -12.03 0.00 0.00 15.69
6 6242.12 50.40 232.71 6085.48 -324.77 -425.31 4.00 232.71 532.79
7 7429.86 50.40 232.71 6842.50 -879.20 -1153.50 0.00 0.00 1443.91 MPK-22 TO Upper Kup D
8 7872.74 74.00 225.79 7047.77 -1134.85 -1446.27 5.50 -16.31 1832.44
9 7962.48 74.00 225_79 7072.50 ~1195.oo -1508.Ji 0.00 0.00 1918.67 MPK-22T1 top C1
10 7982.48 74.00 225.79 7078.01 -1208.40 -1521.89 0.00 0.00 1937-89
11 8109.59 88.81 222.08 70%.96 -1298.70 -1608.78 12.00 -14.25 2062.98
12 8616.80 88.81 222.08 7107.50 -J675.0S -1948.61 0.00 0.00 2568.00 MPK-22 T4 Upper Mid CI
13 8771.34 86.17 213.18 7114.28 -1797.21 -2042.78 6.00 -106.69 2720.04
14 8894.43 86.17 213.18 7122.50 -1900.00 -2110.00 0.00 0.00 2839.16 MPK-221'5 Lower C1
.
.
Sperry-Sun
Anticollision Report
4962.77 4962.50 9.625 12.250 9 5/8"
7962.48 7072.50 7.000 8.500 7"
8894.00 7122.47 4.500 6.125 4 1/2"
Plan: MPK-22 WP10
Principal: Yes
Summary
Date Composed:
Version:
Tied-to:
3/2/2004
108
From Well Ref. Point
M pt Cascade CASCADE-1A CASCADE-1A V1 5295.42 5825.00 221.67 117.08 104.59 Pass: Major Risk
M Pt K Pad MPK-02 MPK-02 V1 975.19 975.00 144.41 16.24 128.17 Pass: Major Risk
MPtKPad MPK-05 MPK-05 V1 1200.19 1200.00 160.45 17.79 142.66 Pass: Major Risk
MPtKPad MPK-06 MPK-06 V1 424.04 425.00 122.16 8.17 113.98 Pass: Major Risk
MPtKPad MPK-13 MPK-13 V5 1494.30 1500.00 79.30 24.62 54.68 Pass: Major Risk
MPtKPad MPK-17 MPK-17V1 3725.09 3725.00 83.66 43.54 40.12 Pass: Major Risk
MPtKPad MPK-18A MPK-18A V1 1625.05 1625.00 44.62 27.23 17.39 Pass: Major Risk
MPtKPad MPK-18 MPK-18 V24 1625.05 1625.00 44.62 27.23 17.39 Pass: Major Risk
MPtKPad MPK-21 MPK-21 V3 777.15 775.00 111.58 12.37 99.21 Pass: Major Risk
MPtKPad MPK-21 MPK-21A V9 777.15 775.00 111.58 12.48 99.10 Pass: Major Risk
MPtKPad MPK-21 MPK-21APB1 V3 777.15 775.00 111.58 12.48 99.10 Pass: Major Risk
MPtKPad MPK-25 MPK-25 V2 Plan: Undefi 851.06 850.00 98.38 13.26 85.11 Pass: Major Risk
M Pt K Pad MPK-30 MPK-30 V4 1023.95 1025.00 46.74 17.09 29.65 Pass: Major Risk
M Pt K Pad MPK-33 MPK-33 V1 1098.52 1100.00 121.07 18.62 102.45 Pass: Major Risk
M Pt K Pad MPK-34 MPK-34 V3 600.67 600.00 90.32 10.22 80.11 Pass: Major Risk
M Pt K Pad MPK-37 MPK-37 V1 1725.19 1725.00 150.17 25.29 124.88 Pass: Major Risk
MPtKPad MPK-38 MPK-38 V1 3324.72 3325.00 119.46 42.87 76.59 Pass: Major Risk
M Pt K Pad MPK-38 Plan MPK-38A V5 Plan: 3324.72 3325.00 119.46 42.83 76.63 Pass: Major Risk
M Pt K Pad MPK-43A MPK-43A V3 900.26 900.00 183.84 13.35 170.49 Pass: Major Risk
MPtKPad MPK-43 MPK-43 V1 900.26 900.00 183.84 13.35 170.49 Pass: Major Risk
MPtKPad Plan MPK-09 Plan MPK-09 V3 Plan: M 527.91 525.00 144.65 11.82 132.83 Pass: Major Risk
MPtKPad Plan MPK-22 Plan MPK-22 old VO Pia 7425.00 7425.00 0.00 0.00 0.00 FAIL: NOERRORS
Site: M pt Cascade
Well: CASCADE-1A Rule Assigned: Major Risk
Wellpath: CASCADE-1A V1 Inter-Site Error: 0.00 ft
4171.10 4170.83 4250.00 4170.83 3.42 6.16 76.65 76.65 7.000 1073.61 51.98 1021.63 Pass
4192.01 4191.74 4275.00 4191.74 3.44 6.38 76.48 76.48 7.000 1060.27 52.28 1007.99 Pass
4212.78 4212.50 4300.00 4212.50 3.45 6.61 76.31 76.31 7.000 1046.72 52.60 994.12 Pass
4233.40 4233.13 4325.00 4233.13 3.47 6.84 76.13 76.13 7.000 1032.96 52.91 980.05 Pass
4253.89 4253.62 4350.00 4253.62 3.49 7.06 75.95 75.95 7.000 1019.00 53.24 965.76 Pass
4274.24 4273.97 4375.00 4273.97 3.51 7.30 75.77 75.77 7.000 1004.85 53.56 951.29 Pass
4294.51 4294.23 4400.00 4294.23 3.53 7.53 75.58 75.58 7.000 990.58 53.89 936.69 Pass
4314.69 4314.41 4425.00 4314.41 3.54 7.77 75.39 75.39 7.000 976.21 54.23 921.98 Pass
4334.78 4334.51 4450.00 4334.51 3.56 8.01 75.18 75.18 7.000 961.74 54.57 907.16 Pass
4354.77 4354.50 4475.00 4354.50 3.58 8.26 74.98 74.98 7.000 947.13 54.92 892.21 Pass
4374.60 4374.33 4500.00 4374.33 3.60 8.50 74.76 74.76 7.000 932.31 55.27 877.04 Pass
4394.26 4393.99 4525.00 4393.99 3.61 8.75 74.55 74.55 7.000 917.25 55.63 861.62 Pass
4413.75 4413.47 4550.00 4413.47 3.63 9.00 74.33 74.33 7.000 901.97 55.99 845.98 Pass
4433.06 4432.78 4575.00 4432.78 3.65 9.25 74.11 74.11 7.000 886.47 56.35 830.12 Pass
.
.
Sperry-Sun
Anticollision Report
4452.19 4451.92 4600.00 4451.92 3.67 9.51 73.89 73.89 7.000 870.75 56.72 814.03 Pass
4471.14 4470.86 4625.00 4470.86 3.68 9.77 73.66 73.66 7.000 854.82 57.10 797.73 Pass
4489.90 4489.63 4650.00 4489.63 3.70 10.03 73.42 73.42 7.000 838.69 57.48 781.20 Pass
4508.56 4508.29 4675.00 4508.29 3.72 10.30 73.17 73.17 7.000 822.45 57.87 764.58 Pass
4527.19 4526.91 4700.00 4526.91 3.73 10.57 72.91 72.91 7.000 806.18 58.27 747.91 Pass
4545.77 4545.49 4725.00 4545.49 3.75 10.84 72.64 72.64 7.000 789.89 58.70 731.20 Pass
4564.31 4564.04 4750.00 4564.04 3.77 11.10 72.35 72.35 7.000 773.59 59.11 714.47 Pass
4582.86 4582.59 4775.00 4582.59 3.78 11.33 72.05 72.05 7.000 757.32 59.50 697.82 Pass
4601.45 4601.17 4800.00 4601.17 3.80 11.55 71.73 71.73 7.000 741.12 59.93 681.19 Pass
4620.06 4619.78 4825.00 4619.78 3.82 11.78 71.40 71.40 7.000 724.99 60.38 664.60 Pass
4638.69 4638.42 4850.00 4638.42 3.83 12.00 71.04 71.04 7.000 708.92 60.84 648.09 Pass
4657.32 4657.04 4875.00 4657.04 3.85 12.22 70.67 70.67 7.000 692.89 61.31 631.58 Pass
4675.93 4675.66 4900.00 4675.66 3.87 12.43 70.27 70.27 7.000 676.88 61.79 615.09 Pass
4694.53 4694.26 4925.00 4694.26 3.89 12.64 69.86 69.86 7.000 660.90 62.29 598.61 Pass
4713.12 4712.84 4950.00 4712.84 3.90 12.89 69.42 69.42 7.000 644.94 62.85 582.10 Pass
4731.65 4731.37 4975.00 4731.37 3.92 13.16 68.95 68.95 7.000 628.97 63.45 565.52 Pass
4750.12 4749.85 5000.00 4749.85 3.94 13.42 68.46 68.46 7.000 612.98 64.08 548.90 Pass
4768.54 4768.27 5025.00 4768.27 3.95 13.69 67.95 67.95 7.000 596.99 64.74 532.25 Pass
4786.88 4786.60 5050.00 4786.60 3.97 13.97 67.40 67.40 7.000 580.95 65.45 515.50 Pass
4805.07 4804.80 5075.00 4804.80 3.99 14.25 66.82 66.82 7.000 564.82 66.20 498.62 Pass
4823.12 4822.85 5100.00 4822.85 4.01 14.54 66.20 66.20 7.000 548.59 66.98 481.61 Pass
4841.02 4840.75 5125.00 4840.75 4.02 14.82 65.54 65.54 7.000 532.28 67.81 464.48 Pass
4858.85 4858.58 5150.00 4858.58 4.04 15.07 64.84 64.84 7.000 515.97 68.63 447.35 Pass
4876.68 4876.41 5175.00 4876.41 4.06 15.31 64.10 64.10 7.000 499.75 69.49 430.26 Pass
4894.51 4894.24 5200.00 4894.24 4.07 15.56 63.30 63.30 7.000 483.62 70.41 413.21 Pass
4912.35 4912.07 5225.00 4912.07 4.09 15.80 62.45 62.45 7.000 467.59 71.38 396.21 Pass
4930.18 4929.90 5250.00 4929.90 4.11 16.02 61.53 61.53 7.000 451.68 72.39 379.29 Pass
4948.00 4947.73 5275.00 4947.73 4.12 16.25 60.54 60.54 7.000 435.91 73.47 362.44 Pass
4965.83 4965.55 5300.00 4965.55 4.14 16.47 59.47 59.47 7.000 420.30 74.62 345.68 Pass
4983.28 4983.00 5325.00 4983.36 4.16 16.72 58.32 185.60 7.000 404.85 75.74 329.11 Pass
4997.22 4996.95 5350.00 5001.07 4.16 16.99 57.06 184.35 7.000 389.60 77.11 312.49 Pass
5011.30 5011.02 5375.00 5018.67 4.15 17.26 55.69 182.98 7.000 374.64 78.56 296.08 Pass
5025.51 5025.22 5400.00 5036.15 4.14 17.54 54.20 181.48 7.000 359.99 80.11 279.88 Pass
5039.87 5039.58 5425.00 5053.54 4.14 17.82 52.57 179.85 7.000 345.71 81.80 263.91 Pass
5054.44 5054.14 5450.00 5070.91 4.13 18.10 50.79 178.08 7.000 331.92 83.61 248.32 Pass
5069.24 5068.91 5475.00 5088.26 4.12 18.38 48.86 176.15 7.000 318.68 85.54 233.14 Pass
5084.26 5083.90 5500.00 5105.61 4.11 18.66 46.77 174.05 7.000 306.02 87.59 218.43 Pass
5099.49 5099.09 5525.00 5122.93 4.10 18.95 44.49 171.78 7.000 294.00 89.77 204.22 Pass
5114.88 5114.42 5550.00 5140.14 4.09 19.23 42.01 169.30 7.000 282.61 92.07 190.54 Pass
5130.44 5129.90 5575.00 5157.27 4.09 19.51 39.33 166.61 7.000 271.94 94.48 177.45 Pass
5146.16 5145.53 5600.00 5174.29 4.08 19.80 36.43 163.71 7.000 262.05 96.98 165.06 Pass
5162.04 5161.29 5625.00 5191.21 4.07 20.10 33.30 160.58 7.000 253.03 99.61 153.42 Pass
5178.08 5177.19 5650.00 5208.01 4.06 20.40 29.94 157.22 7.000 244.97 102.26 142.71 Pass
5194.27 5193.21 5675.00 5224.70 4.05 20.70 26.36 153.65 7.000 237.96 104.90 133.06 Pass
5210.61 5209.37 5700.00 5241.27 4.04 20.99 22.58 149.86 7.000 232.09 107.46 124.63 Pass
5227.15 5225.68 5725.00 5257.76 4.04 21.29 18.63 145.91 7.000 227.43 109.90 117.54 Pass
5243.89 5242.16 5750.00 5274.19 4.03 21.59 14.56 141.84 7.000 224.03 112.13 111.91 Pass
5260.85 5258.82 5775.00 5290.57 4.02 21.89 10.41 137.69 7.000 221.93 114.09 107.84 Pass
5278.02 5275.64 5800.00 5306.89 4.01 22.18 6.23 133.52 7.000 221.14 115.75 105.39 Pass
5295.42 5292.65 5825.00 5323.17 4.00 22.47 2.08 129.37 7.000 221.67 117.08 104.59 Pass
5313.05 5309.83 5850.00 5339.41 4.00 22.76 358.01 125.30 7.000 223.47 118.06 105.40 Pass
.
.
Sperry-Sun
Anticollision Report
5330.91 5327.20 5875.00 5355.62 3.99 23.05 354.07 121.36 7.000 226.49 118.72 107.77 Pass
5349.01 5344.73 5900.00 5371.80 3.98 23.32 350.30 117.58 7.000 230.68 119.05 111.62 Pass
5367.35 5362.44 5925.00 5387.98 3.98 23.59 346.73 114.02 7.000 236.01 119.10 116.91 Pass
5385.93 5380.32 5950.00 5404.15 3.97 23.85 343.40 110.68 7.000 242.41 118.94 123.47 Pass
5404.75 5398.36 5975.00 5420.32 3.96 24.11 340.31 107.59 7.000 249.75 118.63 131.13 Pass
5423.80 5416.55 6000.00 5436.48 3.96 24.34 337.46 104.75 7.000 257.92 118.16 139.76 Pass
5443.10 5434.91 6025.00 5452.65 3.95 24.57 334.85 102.14 7.000 266.71 117.60 149.11 Pass
5462.66 5453.42 6050.00 5468.82 3.95 24.79 332.47 99.76 7.000 276.04 117.02 159.03 Pass
5482.47 5472.08 6075.00 5485.00 3.95 25.01 330.30 97.59 7.000 285.84 116.43 169.40 Pass
5502.53 5490.87 6100.00 5501.17 3.94 25.22 328.33 95.61 7.000 296.02 115.87 180.15 Pass
5522.82 5509.79 6125.00 5517.33 3.94 25.43 326.54 93.82 7.000 306.52 115.36 191.16 Pass
5543.36 5528.82 6150.00 5533.49 3.94 25.64 324.92 92.21 7.000 317.29 114.90 202.39 Pass
5564.12 5547.96 6175.00 5549.64 3.94 25.85 323.46 90.74 7.000 328.28 114.49 213.79 Pass
5585.12 5567.18 6200.00 5565.79 3.94 26.05 322.14 89.42 7.000 339.46 114.16 225.30 Pass
5606.34 5586.48 6225.00 5581.94 3.94 26.25 320.96 88.24 7.000 350.80 113.90 236.90 Pass
5627.78 5605.85 6250.00 5598.11 3.95 26.45 319.90 87.19 7.000 362.27 113.73 248.54 Pass
5649.42 5625.26 6275.00 5614.28 3.96 26.65 318.97 86.25 7.000 373.84 113.64 260.21 Pass
5671.21 5644.65 6300.00 5630.41 3.96 26.85 318.14 85.42 7.000 385.60 113.64 271.95 Pass
5693.12 5663.99 6325.00 5646.49 3.97 27.05 317.41 84.70 7.000 397.56 113.73 283.83 Pass
5715.12 5683.26 6350.00 5662.52 3.98 27.25 316.78 84.07 7.000 409.70 113.90 295.80 Pass
5737.22 5702.44 6375.00 5678.50 4.00 27.45 316.24 83.53 7.000 422.00 114.16 307.84 Pass
5759.47 5721.58 6400.00 5694.49 4.01 27.64 315.78 83.06 7.000 434.33 114.48 319.85 Pass
5781.87 5740.67 6425.00 5710.50 4.03 27.83 315.39 82.68 7.000 446.65 114.87 331.79 Pass
5804.42 5759.70 6450.00 5726.55 4.04 28.02 315.07 82.36 7.000 458.96 115.33 343.63 Pass
5827.08 5778.63 6475.00 5742.61 4.07 28.20 314.82 82.10 7.000 471.26 115.86 355.40 Pass
5849.78 5797.39 6500.00 5758.67 4.09 28.38 314.63 81.92 7.000 483.66 116.45 367.22 Pass
5872.50 5815.96 6525.00 5774.73 4.12 28.55 314.51 81.80 7.000 496.18 117.10 379.09 Pass
5895.21 5834.31 6550.00 5790.78 4.14 28.72 314.45 81.73 7.000 508.82 117.81 391.01 Pass
5917.91 5852.45 6575.00 5806.81 4.18 28.91 314.44 81.72 7.000 521.53 118.63 402.90 Pass
5940.63 5870.38 6600.00 5822.80 4.21 29.10 314.46 81.75 7.000 534.25 119.51 414.74 Pass
5963.37 5888.10 6625.00 5838.76 4.25 29.28 314.52 81.80 7.000 546.97 120.42 426.55 Pass
5986.11 5905.60 6650.00 5854.67 4.29 29.47 314.61 81.89 7.000 559.71 121.37 438.34 Pass
6008.82 5922.84 6675.00 5870.56 4.33 29.65 314.73 82.01 7.000 572.49 122.36 450.13 Pass
6031.45 5939.78 6700.00 5886.44 4.37 29.83 314.88 82.17 7.000 585.37 123.41 461.96 Pass
6053.98 5956.40 6725.00 5902.29 4.42 30.00 315.08 82.36 7.000 598.35 124.49 473.86 Pass
6076.39 5972.71 6750.00 5918.13 4.47 30.18 315.30 82.59 7.000 611.43 125.60 485.83 Pass
6098.73 5988.72 6775.00 5933.95 4.52 30.34 315.55 82.83 7.000 624.54 126.71 497.82 Pass
6121.05 6004.47 6800.00 5949.74 4.58 30.51 315.81 83.10 7.000 637.62 127.88 509.74 Pass
6143.32 6019.93 6825.00 5965.50 4.63 30.67 316.09 83.37 7.000 650.68 129.06 521.62 Pass
6165.53 6035.11 6850.00 5981.25 4.69 30.83 316.38 83.66 7.000 663.72 130.25 533.46 Pass
6187.69 6050.00 6875.00 5996.97 4.75 30.99 316.68 83.97 7.000 676.73 131.46 545.27 Pass
6209.79 6064.60 6900.00 6012.68 4.81 31.15 317.00 84.29 7.000 689.73 132.69 557.04 Pass
6231.82 6078.89 6925.00 6028.38 4.88 31.30 317.33 84.62 7.000 702.70 133.94 568.77 Pass
6253.25 6092.57 6950.00 6044.06 4.95 31.52 317.67 84.95 7.000 715.68 135.16 580.52 Pass
6274.19 6105.92 6975.00 6059.70 5.01 31.79 317.99 85.28 7.000 728.69 136.34 592.35 Pass
6295.13 6119.27 7000.00 6075.31 5.08 32.05 318.30 85.59 7.000 741.75 137.52 604.23 Pass
6316.06 6132.61 7025.00 6090.89 5.15 32.32 318.60 85.89 7.000 754.86 138.70 616.15 Pass
6336.98 6145.94 7050.00 6106.46 5.22 32.58 318.89 86.17 7.000 768.01 139.83 628.17 Pass
6357.86 6159.25 7075.00 6122.08 5.30 32.84 319.17 86.46 7.000 781.20 140.96 640.24 Pass
6378.71 6172.54 7100.00 6137.75 5.37 33.09 319.46 86.74 7.000 794.44 142.11 652.33 Pass
.
.
Sperry-Sun
Anticollision Report
6399.52 6185.80 7125.00 6153.47 5.44 33.36 319.74 87.02 7.000 807.72 143.28 664.44 Pass
6420.28 6199.04 7150.00 6169.23 5.52 33.61 320.01 87.30 7.000 821.08 144.44 676.64 Pass
6440.97 6212.22 7175.00 6185.01 5.59 33.85 320.29 87.57 7.000 834.55 145.57 688.98 Pass
6461.57 6225.35 7200.00 6200.80 5.67 34.09 320.56 87.85 7.000 848.14 146.65 701.49 Pass
6482.10 6238.43 7225.00 6216.61 5.74 34.32 320.83 88.12 7.000 861.83 147.70 714.12 Pass
6502.59 6251.50 7250.00 6232.37 5.82 34.58 321.09 88.38 7.000 875.59 148.85 726.74 Pass
6523.09 6264.56 7275.00 6248.06 5.90 34.84 321.34 88.62 7.000 889.40 149.99 739.41 Pass
6543.58 6277.62 7300.00 6263.68 5.98 35.10 321.57 88.85 7.000 903.25 151.11 752.14 Pass
6564.07 6290.68 7325.00 6279.23 6.06 35.35 321.79 89.07 7.000 917.15 152.22 764.93 Pass
6584.55 6303.73 7350.00 6294.79 6.14 35.61 322.00 89.29 7.000 931.06 153.33 777.73 Pass
6605.03 6316.79 7375.00 6310.37 6.22 35.86 322.21 89.49 7.000 944.99 154.43 790.56 Pass
6625.50 6329.83 7400.00 6325.97 6.30 36.11 322.41 89.70 7.000 958.93 155.53 803.39 Pass
6645.97 6342.88 7425.00 6341.60 6.38 36.35 322.62 89.90 7.000 972.87 156.61 816.27 Pass
6666.45 6355.93 7450.00 6357.30 6.47 36.58 322.82 90.10 7.000 986.80 157.66 829.14 Pass
6686.93 6368.99 7475.00 6373.08 6.55 36.81 323.02 90.30 7.000 1000.69 158.71 841.99 Pass
6707.43 6382.05 7500.00 6388.93 6.63 37.05 323.22 90.50 7.000 1014.57 159.76 854.81 Pass
6727.95 6395.13 7525.00 6404.85 6.72 37.28 323.42 90.70 7.000 1028.40 160.82 867.58 Pass
6748.53 6408.25 7550.00 6420.79 6.81 37.51 323.61 90.90 7.000 1042.17 161.88 880.28 Pass
6769.16 6421.40 7575.00 6436.76 6.89 37.74 323.80 91.08 7.000 1055.86 162.94 892.92 Pass
6789.86 6434.59 7600.00 6452.74 6.98 37.98 323.98 91.26 7.000 1 069.49 163.99 905.49 Pass
6810.55 6447.77 7625.00 6468.72 7.07 38.22 324.15 91.44 7.000 1083.12 165.08 918.04 Pass
Site: M PI K Pad
Well: MPK-02 Rule Assigned: Major Risk
Wellpath: MPK-02 V1 Inter-Site Error: 0.00 ft
174.99 174.99 175.00 174.99 0.41 0.12 338.38 338.38 148.54 3.90 144.63 Pass
199.99 199.99 200.00 199.99 0.50 0.14 338.38 338.38 148.26 4.49 143.77 Pass
224.99 224.99 225.00 224.99 0.55 0.17 338.39 338.39 147.97 4.98 142.99 Pass
249.99 249.99 250.00 249.99 0.61 0.19 338.41 338.41 147.66 5.48 142.19 Pass
274.99 274.99 275.00 274.99 0.66 0.22 338.43 338.43 147.33 5.97 141.36 Pass
299.98 299.98 300.00 299.98 0.72 0.25 338.46 338.46 146.97 6.47 140.51 Pass
324.78 324.78 325.00 324.98 0.73 0.27 338.51 108.51 146.62 6.81 139.81 Pass
349.57 349.57 350.00 349.98 0.74 0.30 338.60 108.60 146.31 7.16 139.14 Pass
374.37 374.37 375.00 374.97 0.75 0.32 338.73 108.73 146.03 7.51 138.52 Pass
399.16 399.16 400.00 399.97 0.75 0.34 338.89 108.89 145.79 7.85 137.93 Pass
423.95 423.94 425.00 424.97 0.78 0.37 339.10 109.10 145.58 8.25 137.33 Pass
448.73 448.72 450.00 449.97 0.80 0.39 339.35 109.35 145.40 8.64 136.76 Pass
473.51 473.49 475.00 474.96 0.83 0.42 339.64 109.64 145.26 9.04 136.22 Pass
498.28 498.24 500.00 499.96 0.85 0.44 339.98 109.98 145.14 9.43 135.71 Pass
523.05 522.99 525.00 524.96 0.88 0.47 340.36 110.36 145.06 9.85 135.21 Pass
547.81 547.73 550.00 549.95 0.91 0.50 340.78 110.78 145.02 10.27 134.75 Pass
572.55 572.45 575.00 574.95 0.94 0.53 341.24 111.24 145.03 10.70 134.34 Pass
597.29 597.16 600.00 599.95 0.97 0.56 341.74 111.74 145.09 11.12 133.97 Pass
622.45 622.28 625.00 624.94 0.97 0.59 342.25 112.25 145.16 11.48 133.67 Pass
00 Vi
149 00 Vi
I
149 HI 00 Vi
¡
149 1 6 00 Vi
MPU K-22
Proposed 1-WINJ
2050140
Area of Review
SFD 2/17/2005
-.J
o
t-,J
0>
8
z
SONORA 0 STEWMAN
BP EXPLORA TIONAK INC "Mastercard Check"
PO BOX 196612 MB 7-5
ANCHORAGE, AK 99519-6612
89-6/1252 1 22
DATE OZ-ll-DC)'
~ò¡~ 6FHE . ~~c?c"'L:- I $ lDS> ..C)(J
(?\ e..~ rQ¿ _ G. \{\ ~~"":>.- DOLLARS
First National Sa Alaska
:::~?~'_~7v; ~/~_
.
I: ~ 25 2000(;OI:qq ~I.,"I(; 2 2 71" ~ 5(;1.,11- 0 ~ 2 2
.
.
.
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERIP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME
/J1¡?¿¿ ~-¿2-~-
PTD#
2-D S- - 02-2--
»evelopment
V Service
Exploration
Stratigraphic
CHECK WHAT ADD-ONS "'CLUE n.
AP:PLJES (OPTIONS)
MULTI Tbe permit is for a Dew weJlbore 'segmeut of
LATERAL e:xistiug weD .
Permit No, API No. .
(If API Dumber ProductioD. sbould cODtiDue to be reponed as
last two, (2) digits a fUDctioD' of tbe origiual API Dumber. stated
are between 60-69) above.
.
PILOT HOLE )u accordaDce witb' 20 AAC 25.005(t), all
(PH) records, data aDd logs acquired for tbe pilot
bole must be clearly differeutiated In botb
Dame (name ou permit pJus PH)
" aud API Dumber (50 -
70/80) from records, data aud logs acquired
for well (Dame on permit).
SPACING Tbe permit is Bpproved subject -to fuD
EXCEPTION " comp1iBnce witb 20 AAC 25..0SS~ Approval to
perforate Bnd produce is cODtingeut upou
issuance of ~ cODservation order approviag a
spaciug e:J ception.
(Company Name) assumes tbe JiabiUty of auy
protest to tbe spaciug .e:xception tbat mey
occur.
:
DRY DITCH An dry ditch sample sets submitted to the
SAMPLE Commission must be iD DO greater -tban 30'
" sample intervals from below tbe permafrost
or from where samples are first caugbt and
10' sample biter:vals through target zones.
"
Field & Pool MILNE POINT, KUPARUK RIVER OIL - 525100 Well Name: MILNE PT UNIT KR K-22 Program SER Well bore seg
PTD#:2050220 Company BPEXPLORATION (ALASKA) INC InitialClasslType SER/PEND GeoArea 890 Unit 11328 On/OffShore On Annular Disposal
1 P~rmitfee attaçheJ:l . . . . . . . ~ ~ . . . . .. . . . . . . . ~ ~ . . . . .Y~s ~ ~ ~ . ~ ~ ~ ~ . . . . . . . . . . . . . . ~ ~ . ~ . . . . . . . . . . ~ . . . . .
2 ~Leas~mJlJlberappropriSite . . . ~ ~ .. ~....... ..... ~ . . . . . . Y~s . . ~ . . . . ~ . . . . . . . . ~ . . . . . . . . . ~ ~ . . .
3 ~U~nique weILn.a[T1~~a[1d Ol!mb~er ~ ~ . ~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ ~ . . . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ . ~ ~ . Y~s ~ ~ ~ ~ ~ . . . . . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ . . . . ~ ~ . ~ ~ . ~ . . ~ . . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . . . . . ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ . . ~ ~ .
4 WenJocSitedinad~efioe.dpool . ~ ~ ~.. ....... ~. ~.... ~ .... Y~s- . .Kup.arukRjverOil~0.0[,governedbyCon~seryati.c)[10rd.erlo.432C ~... ~.
5 WeJlJocSited properdistance~ from driJling uoitbouod~(y~ . . Y~s ~ . . . ~ . . WelJb.ore.will be~more thSiO 500' from exteroal boundary.. . . . ~ ~ . . . ~ . . . . . . . .
6 WeJlJocSited proper .distance~ from otber welJs~ . . . ~ . . . . . ~ Y~s ~ . . . . . . lO interweJl $pacing restriçtions.. ~ . . . . . . . . . . . . . . ~ . . ~ ~ ~ . . . . .
7 ~S~utfiçieotaçreageaYail<lble in. drilJiog unit ~ ~ ~ ~ ~ . . . . . . . . . . . . . . . Yes ~ . . . ~ ....... . . . . . . . ~ . . . . . . . . . . . . . ~ ~ . . . .
8 Jf.deviated, js. weJlbore platJlJcJuded . . . . ~ ~ . . ~ . . . . Yes ~ ~ . . ~ ~ . .. ......... ~ . . . . . . . . . . . ~ . . .
9 .Operator ooly affeçted party. . . . . ~ . . . . . . . . . . . . . . . . . . . ~Y~s ~ . . . . . . . ~ . . . . . . . . . . . . . . ~ . . . . . . . . . ~ ~ ~ . . ~ . . . . . . . ~ . . . . .
1 0 ~O'perator bas~appropriate. b.ond inJorce . . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ . . . ~ . . ~ ~ ~ ~ ~ ~ ~ . . . ~ ~ . Y~s ~ ~ ~ ~ ~ . ~ . ~ ~ ~ ~ ~ . ~ ~ ~ ~ ~ ~ ~ . . ~ . . . ~ . ~ . ~ ~ ~ ~ ~ ~ . ~ ~ ~ . ~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ . . . ~ . ~ ~ ~ ~ ~ ~ . ~ . . . .
11 P~rmit. c.al1 be issl!ed witbout co.nservatioo order ~ ~ ~ ~ ~ . . . . Y~s . ~ . . ~ . . . ~ ~ . . . . . ~
Appr Date 12 P~rmit c.al1 be iSSl!ed witbout admioistratille~approvaL . . . . . . ~ . . . . . . . . Y~s . . . . . . . . . . . . . ~ . . ~ .
SFD 2/17/2005 13 Can permit be approved before 15-day wait Yes
14 WellJocated withio area and strata .authorized by. I [1jectioo Ord~r # (puUOfl in~co[T1m~l1ts). (For. Y~s . 8rea Injectjon.Order No.. 10-6. ..... ~
15 ~AJlweIJs-,,.{it]1in.1l4.mile~area~ofreyiewid~otified(FOrservj~-"'le[looly)~ ~ ~ ~ ~ ~ ~ ~. ~. ~ ~ ~. Y~s- ~ ~ ~ ~ ~ ~MPUK~2.5.MI?U!<:37~ ~ ~.. ~ ~.. ~ ~ ~ ~ ~ ~ ~ ~ ~. ~ ~.... ~ ~ ~ ~ ~ ~ ~ ~"".. ~ ~ ~ ~ ~ ~ ~ ~ ~. ~ ~ ~...
16 Pre-produced i[1jector; J:lur<ltionof pre-proJ:luctiolJ I~ss. than.3IJlootbs.(Forservice well onJy) . No. . ~ . . . . . . . . . . ~ . . . .
17 AÇMP.F:indjng.ofCon,Si$te[1çy.h.as beenjssued~forJbis pr.oieçt. . . . . . .NA ~ . . . . . . . . . . . . . . .
18 ~Col1du.ctor string.provided . Y~s ~
19Surfa~.casingprQtec.ts alLkJlown USDWs . ~ . . . . . . . NA . .
20 .CMT v~ol adeql!ateJo çirc.ulateoncOlJd.uctor. &. surf.C$g . . . . . . . ~ . . . . . . . . . Y~s . . . ~ ~
21 .CMTvoladequateJotie-inJongstriJlgto.sUrfcsg...... .. No... PIç¡oi$for1000'oLfilJabovethe7"shoe.
22CMTwill çoyer.aJl koownpro~ductiYe borilon.s. . ~ . . . . . . . . . . . No . . . . . . . Slotted Jil1er .completio[1 pl~l1ned..
23Casil1g deslgl1s ad.e~uate for C,.T, B.&permafrost. . ~ Y~s .
24 Mequ<ltetankç¡ge.or re~serve pit. . . . . . . . ~ . . . . . . . . . . .... .. Y~s ~ . Rig isequippè.d.with $t~elp¡ts.. NQ reservepjtplaJloed, All wç¡ste toapprove~d.dispsoal wells..
25 Jf.are-drill~ has.a. to-403 for Sibandonment be~11 ç¡pproved . . . . .NA . . ~ . . . . . . . . . . . . . . .
26 ~Mequ<lte.we[lbore separç¡tionproposeJ:l. . ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ . . . . . ~ ~ ~ ~ ~ ~ ~ ~ ~ . . . . ~ ~ Y~s ~ . ~ ~ ~ ~ ~ I?ro~ilJlit)l. an<llysis perf.orme.d, Jrayeling cylil1der pIOt.iocJu.ded. ~ GyrosJiJ<ely to.1l00'.~ ~ . . ~ . ~ ~ ~ ~ ~ ~ ~ . . ~ ~ .
27 Jf.diverter req.uired, does jtmeet reguJatioos~ ~ . . . Y~s . . . . . . . . ~ ~ ~ ~ . . . . . . . . . . .. ......... ~ . . ~ ~ ~ . . . . . . . . . . . . . .
28 .Drilliog fluid. program schelJlç¡tic& equipJist.adequç¡te~ . . . . . . . Yes- Maximum expected formation pressure7,8~EMW.. Plal10edMW .10.1 ppg for:. HRZ anJ:l9,0. -.9, 1. ppg jn Kupç¡ruk..
29 .BOPEs,.d.othey meet.reguJatioo . . . . . . . . . . . ~ ~ . . . . . . . . . Y~s ~ ~ . ~ ~ . ~ ~ . . . . . . . ~ ~ . . . . .. . ~ ~ . . . . . . . . . . . .
30 .BOPE~press ra.til19 appropriate;testto(pu.t psig in~CQmmeots). . . . . . . . . . . Y~s . . MAS¡=> calçulate.d.a.2.278 psi. 35.00 psi J30Ptest plç¡on~d. . . . ~ . . . ~ . . . ~ ~ . . . . . .
31 Choke. manifold compJies w/APL R~-53 (May 84). . . ~ . . . . Y~s . ~ ~ ~ . . . . . . ~ . . . ~ . . . . . . . . . ~ . . . . . . . . . . . . . . . . . . . .
32 Work wiJl occur without.operatjon .sbutdo-"'ln~ .... ~ . . .. . . . . . . . . . . ~ . . Y~s ~ ~ . . ~ ~ . . . . . . . . . . . . ~ . . . . . .
33 Js presence. of H2S gas. prob.able ~ . . . . . No Up 1.0.20 ppm .H2S reported. o.n.K paJ:l. M.ud shoul.dpre.clude H2S on rig, Rig ha$sensor:.s.a[1d alç¡rms,
34 Mecha.nicaLcoodiUo[1of wells withio 80R Yerified (for s~ervice welJ onJy) ~ ...... . Yes. . . . Yes, MPK-25 Jlot.drilled .below surface ca.sing. MPK-.37 çlosest approç¡ch. 1670'dista[1ta.tTD ~ ~ ~ . . . . . . . . . .
35 Permitcal1beissl!edwlohYdrogen.s~ulfidemeasures~ ........ ~.. No.. ~.. ~ ,.MPU!<~Oß.aJldMPU.K~38.h.avelJleasuredm.ore.tban2~0.ppm.H2S ...... . ~ ~.......
36 .D.ata.preseotedon~pote.ntialoverpres.sure.zooe$... ~ ~'.... ......... Yes~ .Expectedpressur~Jangejs8Ato7..8.ppgwithil)(eservojr;willbedrilledwitn~9..Q-.9J.ppg[T1ud.. ~'....
Appr Date 37 ~S~ismic.aJlalysjs Qf$baJlow gas.zol1es.. ~ ~ . . . . . . . . . . . ~NA . .. ~. Hydrates.expecte; mud weight may be inçreas~ed to 10,1.10 çontroLhydrates.. . . . . ~ ~
SFD 2/17/2005 38Seabedcooditioo survey (if off-sh.ore) . . . ~ ~ . . . . ~ . . . . . . . ~ . . . . . ~ . . . . . ~ . NA . . ~ ~ ~ . . . . . . ~ ~ . . . . . . . . . . . ~ ~ ~ ~ . . . . . ~ . ~ ~ . ~ . . ~ ~ ~ . . . . . . . . .
39 . Contact oam.elp]1oneforweekly progress reports [explorç¡to(y .0[1ly] . . . . . . . . . ~ . . . .NA . . . . ~ . . . . . ~ ~ . . . . . ~ ~ ......... . ~ . . . ~. ....... .. ~ ~ . . ~ . . . .
Administration
Engineering
Appr Date
TEM 2/22/2005
þ~
Geology
- - - - - - - -
- - - - - - - -
o
o
.
.
Geologic
Commissioner:
OTS
- - - - - - - -
. M aquifers ex~mpted,AOCFR147.102. (b) (3). .
- - - - - -
- - - - - -
- - - - - - -
- - - - - -
Date:
Engineering
Commissioner:
~o
ji:""~J'
Date
~) 22./0'
.
.
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
"'3 n--~ ().:t (l - . 8oS-- ð(}.;)
Sperry-Sun Drllllng Services 4IIÞ
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Wed Apr 12 15:52:24 2006
Reel Header
Service name........... ..LISTPE
Date. . . . . . . . . . . . . . . . . . . . .06/04/12
Origin. . . . . .. .. .. . . . .... .STS
Reel Name. .......... .....UNKNOWN
Continuation Number. .....01
Previous Reel Name. .... ..UNKNOWN
Comments........... .... ..STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name.... ........ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .06/04/12
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name.............. ..UNKNOWN
Continuation Number.... ..01
Previous Tape Name..... ..UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPK-22 PB1
500292324970
B.P. Exploration (Alaska) Inc.
Sperry Drilling Services
12-APR-06
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
MW0003642743
R. FRENCH
E. VAUGHN
MWD RUN 2
MW0003642743
R. FRENCH
D. GREEN
MWD RUN 3
MW0003642743
C.A. DEMOSKI
D. GREEN
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
3
12N
11E
3661
1987
62.45
28.20
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE
BIT SIZE (IN)
12.250
8.750
6.125
CASING
SIZE (IN)
20.000
9.625
7.000
DRILLERS
DEPTH (FT)
114.0
3535.0
8090.0
#
REMARKS:
.
.
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUNS 1-3 COMPRISED DIRECTIONAL, DUAL GAMMA RAY
(DGR) UTILIZING GEIGER-
MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4
(EWR4). MWD RUN 3 ALSO INCLUDED COMPENSATED THERMAL
NEUTRON POROSITY (CTN),
AZIMUTHAL LITHO-DENSITY (ALD), AND AT-BIT
INCLINATION (ABI).
4. MWD DATA ARE CONSIDERED PDC PER E-MAIL RECEIVED FROM
D. DORTCH (SAIC/BP)
ON 21 MARCH 2006, QUOTING AUTHORIZATION FROM MIKIE
WEEKS (BP GEOSCIENTIST) .
5. MWD RUNS 1-3 REPRESENT WELL MPK-22 PB1 WITH API#:
50-029-23249-70. THIS
WELL REACHED A TOTAL DEPTH (TD) OF 8324'MD/7097'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP).
TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE
MATRIX, FIXED HOLE SIZE) .
CTFA SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE.
CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE.
SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT
BIN) .
SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN) .
SNP2 = SMOOTHED NEAR-DETECTOR-ONLY PHOTOELECTRIC
ABSORPTION FACTOR (LOW-COUNT
BIN) .
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
ALDSLIDE = NON-ROTATED INTERVALS REFLECTING SENSOR
DEPTHS.
PARAMETERS USED IN POROSITY LOG PROCESSING:
HOLE SIZE: 6.125"
MUD WEIGHT: 9.0 PPG
MUD SALINITY: 39000 PPM CHLORIDES
FORMATION WATER SALINITY: 10000 PPM CHLORIDES
FLUID DENSITY: 1.0 G/CC
MATRIX DENSITY: 2.65 G/CC
LITHOLOGY: SANDSTONE
$
File Header
Service name......... ... .STSLIB.001
Service Sub Level Name...
Version Number... ....... .1.0.0
Date of Generation...... .06/04/12
Maximum Physical Record. .65535
File Type...............~
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
RPS
RPD
FET
RPX
RPM
NPHI
NCNT
FCNT
RHOB
DRHO
PEF
$
1
.
and clipped curveSj all bit runs merged.
.5000
START DEPTH
76.5
116.5
165.0
165.0
165.0
165.0
165.0
8004.0
8004.0
8004.0
8019.0
8019.0
8019.0
STOP DEPTH
8273.0
8324.0
8280.0
8280.0
8280.0
8280.0
8280.0
8236.5
8236.5
8236.5
8252.5
8252.5
8252.5
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ------.
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
#
REMARKS:
BIT RUN NO
1
2
3
MERGED MAIN PASS.
$
MERGE TOP
76.5
3545.0
8090.0
MERGE BASE
3545.0
8090.0
8324.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction............ .....Down
Optical log depth units..... ..... .Feet
Data Reference Point. ............ .Undefined
Frame Spacing...... .... .......... .60 .1IN
Max frames per record............ . Undefined
Absent value.................. ....-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
FCNT MWD CNTS 4 1 68 4 2
NCNT MWD CNTS 4 1 68 8 3
RHOB MWD G/CM 4 1 68 12 4
DRHO MWD G/CM 4 1 68 16 5
RPD MWD OHMM 4 1 68 20 6
RPM MWD OHMM 4 1 68 24 7
RPS MWD OHMM 4 1 68 28 8
RPX MWD OHMM 4 1 68 32 9
FET MWD HOUR 4 1 68 36 10
GR MWD API 4 1 68 40 11
PEF MWD BARN 4 1 68 44 12
ROP MWD
NPHI MWD
FT/H
PU-S
.
4
1
1
13.
14
68
68
48
52
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 76.5 8324 4200.25 16496 76.5 8324
FCNT MWD CNTS 203.69 1451.97 506.958 466 8004 8236.5
NCNT MWD CNTS 18137.4 41205.8 25281.2 466 8004 8236.5
RHOB MWD G/CM 0.307 3.054 1. 88199 468 8019 8252.5
DRHO MWD G/CM -4.899 0.639 -0.580521 468 8019 8252.5
RPD MWD OHMM 0.18 2000 33.3556 16231 165 8280
RPM MWD OHMM 0.36 2000 21.6279 16231 165 8280
RPS MWD OHMM 0.22 2000 13.3238 16231 165 8280
RPX MWD OHMM 0.2 2000 10.776 16231 165 8280
FET MWD HOUR 0.13 57.19 1.25825 16231 165 8280
GR MWD API 10.98 462.83 90.1296 16394 76.5 8273
PEF MWD BARN 1.41 14.69 5.18735 468 8019 8252.5
ROP MWD FT/H 0.8 928.3 161. 472 16416 116.5 8324
NPHI MWD PU-S 13.38 44.36 28.4694 466 8004 8236.5
First Reading For Entire File......... .76.5
Last Reading For Entire File.......... .8324
File Trailer
Service name....... .... ..STSLIB.001
Service Sub Level Name...
Version Number.. ........ .1.0.0
Date of Generation...... .06/04/12
Maximum Physical Record. .65535
File Type.............. ..LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name.... ........ .STSLIB.002
Service Sub Level Name. . .
Version Number...... .....1.0.0
Date of Generation. .... ..06/04/12
Maximum Physical Record..65535
File Type................ LO
Previous File Name.. ... ..STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
RPD
FET
RPM
RPX
RPS
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
76.5
116.5
165.0
165.0
165.0
165.0
165.0
#
STOP DEPTH
3503.5
3545.0
3496.0
3496.0
3496.0
3496.0
3496.0
.
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RES IS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type... ..0
Logging Direction............ .....Down
Optical log depth units..... ......Feet
Data Reference Point...... ...... ..Undefined
Frame Spacing........... ........ ..60 .1IN
Max frames per record............ .Undefined
Absent value....... .... .......... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
.
10-APR-05
Insite
66.37
Memory
3545.0
222.0
3545.0
.0
3.3
TOOL NUMBER
124724
59672
12.250
SPUD MUD
10.50
90.0
8.0
700
8.8
3.000
2.120
2.700
2.600
60.0
87.8
62.0
62.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RPD MWD010 OHMM 4 1 68 4 2
RPM MWD010 OHMM 4 1 68 8 3
RPS MWD010 OHMM 4 1 68 12 4
RPX MWD010 OHMM 4 1 68 16 5
FET MWD010 HOUR 4 1 68 20 6
GR MWD010 API 4 1 68 24 7
ROP
MWD010
FT/H
.
1
68
28
8.
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 76.5 3545 1810.75 6938 76.5 3545
RPD MWD010 OHMM 0.18 2000 31.4938 6663 165 3496
RPM MWD010 OHMM 0.36 2000 31.4853 6663 165 3496
RPS MWD010 OHMM 0.27 2000 26.4356 6663 165 3496
RPX MWD010 OHMM 0.25 2000 20.2039 6663 165 3496
FET MWD010 HOUR 0.13 5.23 0.550383 6663 165 3496
GR MWD010 API 15.47 121. 36 65.2466 6855 76.5 3503.5
ROP MWD010 FT/H 6.15 928.3 189.739 6858 116.5 3545
First Reading For Entire File.... ..... .76.5
Last Reading For Entire File..... ......3545
File Trailer
Service name...... ...... .STSLIB.002
Service Sub Level Name. . .
Version Number....... ... .1.0.0
Date of Generation...... .06/04/12
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name....... ......STSLIB.003
Service Sub Level Name...
Version Number.. ........ .1.0.0
Date of Generation...... .06/04/12
Maximum Physical Record. .65535
File Type........... .....LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPS
FET
RPX
RPD
RPM
GR
ROP
$
3
header data for each bit run in separate files.
2
.5000
START DEPTH
3496.5
3496.5
3496.5
3496.5
3496.5
3504.0
3545.5
STOP DEPTH
8046.0
8046.0
8046.0
8046.0
8046.0
8053.0
8090.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
15-APR-05
Insite
66.37
Memory
8090.0
TOP LOG INTERVAL (FT): tit
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RES IS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type........ ..........0
Data Specification Block Type.....O
Logging Direction............ .....Down
Optical log depth units..... .... ..Feet
Data Reference Point. .... ........ .Undefined
Frame Spacing...... .... .......... .60 .1IN
Max frames per record........ .....Undefined
Absent value................ ......-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
3545.0
8090.0
.0
75.4
TOOL NUMBER
132477
66259
8.750
LSND
10.15
50.0
9.0
600
4.6
1.980
1.040
2.100
2.300
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RPD MWD020 OHMM 4 1 68 4 2
RPM MWD020 OHMM 4 1 68 8 3
RPS MWD020 OHMM 4 1 68 12 4
RPX MWD020 OHMM 4 1 68 16 5
FET MWD020 HOUR 4 1 68 20 6
GR MWD020 API 4 1 68 24 7
ROP MWD020 FT/H 4 1 68 28 8
Name Service Unit
DEPT FT
Min
3496.5
Max
8090
Mean Nsam
5793.25 9188
.
73.0
145.4
73.0
73.0
First
Reading
3496.5
Last
Reading
8090
RPD MWD020 OHMM 0.4. 2000 17.9076 9100 .496.5 8046
RPM MWD020 OHMM 0.56 2000 5.62124 9100 3496.5 8046
RPS MWD020 OHMM 0.54 1728.24 3.89459 9100 3496.5 8046
RPX MWD020 OHMM 0.54 1874.06 3.95372 9100 3496.5 8046
FET MWD020 HOUR 0.14 53.19 1.23117 9100 3496.5 8046
GR MWD020 API 10.98 462.83 109.865 9099 3504 8053
ROP MWD020 FT/H 0.8 438.14 144.165 9090 3545.5 8090
First Reading For Entire File......... .3496.5
Last Reading For Entire File.......... .8090
File Trailer
Service name......... ....STSLIB.003
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... .06/04/12
Maximum Physical Record. .65535
File Type... .... ........ .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name... ......... .STSLIB.004
Service Sub Level Name. . .
Version Number........ ...1.0.0
Date of Generation.. ... ..06/04/12
Maximum Physical Record..65535
File Type......... ..... ..LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
NPHI
NCNT
FCNT
DRHO
PEF
RHOB
RPM
RPX
RPD
FET
RPS
GR
ROP
$
4
header data for each bit run in separate files.
3
.5000
START DEPTH
8004.0
8004.0
8004.0
8019.0
8019.0
8019.0
8046.5
8046.5
8046.5
8046.5
8046.5
8053.5
8090.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
STOP DEPTH
8236.5
8236.5
8236.5
8252.5
8252.5
8252.5
8280.0
8280.0
8280.0
8280.0
8280.0
8273.0
8324.0
18-APR-05
Insite
66.37
Memory
8324.0
8090.0
.
BOTTOM LOG INTERVAL (FT)~
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
CTN
EWR4
ALD
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
COMP THERMAL NEUTRON
Electromag Resis. 4
Azimuth. Litho-Den
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type............. .....0
Data Specification Block Type.. ...0
Logging Direction.......... ..... ..Down
Optical log depth units.. ........ .Feet
Data Reference Point. ............ . Undefined
Frame Spacing.......... ......... ..60 .1IN
Max frames per record......... ....Undefined
Absent value................ ......-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
8324.0
.
79.0
92.5
TOOL NUMBER
178513
100547
159439
183652
6.125
FLO-PRO
9.05
53.0
9.5
39000
5.2
.190
.130
.100
.250
72 .0
107.6
72.0
72.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
FCNT MWD030 CNTS 4 1 68 4 2
NCNT MWD030 CNTS 4 1 68 8 3
RHOB MWD030 G/CM 4 1 68 12 4
DRHO MWD030 G/CM 4 1 68 16 5
RPD MWD030 OHMM 4 1 68 20 6
RPM MWD030 OHMM 4 1 68 24 7
RPS MWD030 OHMM 4 1 68 28 8
RPX MWD030 OHMM 4 1 68 32 9
FET MWD030 HOUR 4 1 68 36 10
GR MWD030 API 4 1 68 40 11
PEF MWD030 BARN 4 1 68 44 12
ROP MWD030 FT/H 4 1 68 48 13
~
NPHI MWD030
PU-S .
1 68
52
14.
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 8004 8324 8164 641 8004 8324
FCNT MWD030 CNTS 203.69 1451. 97 506.958 466 8004 8236.5
NCNT MWD030 CNTS 18137.4 41205.8 25281.2 466 8004 8236.5
RHOB MWD030 G/CM 0.307 3.054 1.88199 468 8019 8252.5
DRHO MWD030 G/CM -4.899 0.639 -0.580521 468 8019 8252.5
RPD MWD030 OHMM 2.85 2000 360.24 468 8046.5 8280
RPM MWD030 OHMM 0.74 2000 192.528 468 8046.5 8280
RPS MWD030 OHMM 0.22 1594.6 9.99545 468 8046.5 8280
RPX MWD030 OHMM 0.2 1593.17 9.20658 468 8046.5 8280
FET MWD030 HOUR 0.37 57.19 11. 8628 468 8046.5 8280
GR MWD030 API 48.37 91.45 69.6797 440 8053.5 8273
PEF MWD030 BARN 1. 41 14.69 5.18735 468 8019 8252.5
ROP MWD030 FT/H 4.94 160.94 83.4054 468 8090.5 8324
NPHI MWD030 PU-S 13.38 44.36 28.4694 466 8004 8236.5
First Reading For Entire File... ...... .8004
Last Reading For Entire File.......... .8324
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .06/04/12
Maximum Physical Record. .65535
File Type...... ......... .LO
Next File Name. ......... .STSLIB.005
Physical EOF
Tape Trailer
Service name. ........... .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .06/04/12
Origin.................. .STS
Tape Name......... ..... ..UNKNOWN
Continuation Number..... .01
Next Tape Name.... ..... ..UNKNOWN
Comments.......... ...... .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name....... ..... .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .06/04/12
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name. ......... . UNKNOWN
Comments..... ........... .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File
I "3 rt"a
uxc.. f)QD -0;) d-.
Sperry-Sun Dr~ing Services
LIS Scan Utility
.
$Revision: 3 $
LisLib $Revision: 4 $
Wed Apr 12 13:44:27 2006
Reel Header
Service name..... ....... .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .06/04/12
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name. .......... .....UNKNOWN
Continuation Number......01
Previous Reel Name...... .UNKNOWN
Comments........ ........ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name. ........ ....LISTPE
Date. . . . . . . . . . . . . . . . . . . . .06/04/12
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name....... ........ .UNKNOWN
Continuation Number..... .01
Previous Tape Name...... .UNKNOWN
Comments............... ..STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPK-22
500292324900
B.P. Exploration (Alaska) Inc.
Sperry Drilling Services
12-APR-06
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
MW0003642743
R. FRENCH
E. VAUGHN
MWD RUN 2
MW0003642743
R. FRENCH
D. GREEN
MWD RUN 3
MW0003642743
C.A. DEMOSKI
D. GREEN
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
MW0003642743
C.A. DEMOSKI
D. GREEN
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
3
12N
llE
3661
1987
62.45
28.20
#
WELL CASING RECORD
OPEN HOLE
CASING
DRILLERS
u Ie... dD~ -O;;)~
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
BIT S~
12.250
8.750
6.125
(IN)
SIZE (IN)
20.000
9.625
7.000
DEPTH (FT)
114.0
3535.0
8090.0
.
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. THIS WELLBORE IS AN OPENHOLE SIDETRACK, EXITING
MPK-22 PB1 AT 8200'MD/
7100'TVD.
4. MWD RUNS 1-4 COMPRISED DIRECTIONAL, DUAL GAMMA RAY
(DGR) UTILIZING GEIGER-
MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4
(EWR4). MWD RUNS 3 & 4 ALSO INCLUDED COMPENSATED
THERMAL NEUTRON POROSITY
(CTN), AZIMUTHAL LITHO-DENSITY (ALD), AND AT-BIT
INCLINATION (ABI).
5. MWD DATA ARE CONSIDERED PDC PER E-MAIL RECEIVED FROM
D. DORTCH (SAIC/BP)
ON 21 MARCH 2006, QUOTING AUTHORIZATION FROM MIKIE
WEEKS (BP GEOSCIENTIST) .
6. MWD RUNS 1-4 REPRESENT WELL MPK-22 WITH API#:
50-029-23249-00. THIS WELL
REACHED A TOTAL DEPTH (TD) OF 8894'MD/7135'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP).
TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE
MATRIX, FIXED HOLE SIZE) .
CTFA SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE.
CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE.
SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT
BIN) .
SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN) .
SNP2 = SMOOTHED NEAR-DETECTOR-ONLY PHOTOELECTRIC
ABSORPTION FACTOR (LOW-COUNT
BIN) .
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
ALDSLIDE = NON-ROTATED INTERVALS REFLECTING SENSOR
DEPTHS.
PARAMETERS USED IN POROSITY LOG PROCESSING:
HOLE SIZE: 6.125"
MUD WEIGHT: 9.0 PPG
MUD SALINITY: 39000 PPM CHLORIDES
FORMATION WATER SALINITY: 20000 PPM CHLORIDES
FLUID DENSITY: 1.0 G/CC
MATRIX DENSIT. 2.65
LITHOLOGY: SANDSTONE
$
G/CC
.
File Header
Service name...... ..... ..STSLIB.001
Service Sub Level Name...
Version Number. ......... .1.0.0
Date of Generation..... ..06/04/12
Maximum Physical Record..65535
File Type............... .LO
Previous File Name..... ..STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
RPX
RPD
FET
RPM
RPS
NCNT
NPHI
FCNT
RHOB
PEF
DRHO
$
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
76.5
116.5
165.0
165.0
165.0
165.0
165.0
8004.0
8004.0
8004.0
8094.0
8094.0
8094.0
STOP DEPTH
8842.5
8894.0
8849.5
8849.5
8849.5
8849.5
8849.5
8806.0
8806.0
8806.0
8822.0
8822.0
8822.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
$
#
REMARKS:
BIT RUN NO
1
2
3
4
MERGED MAIN PASS.
$
MERGE TOP
76.5
3545.0
8090.0
8200.0
MERGE BASE
3545.0
8090.0
8200.0
8894.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.......... ..... ..Down
Optical log depth units.......... .Feet
Data Reference Point......... .....Undefined
Frame Spacing............ ........ .60 .1IN
Max frames per record............ .Undefined
Absent value...... . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
FCNT MWD
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
CNTS 4 1 68 4 2
NCNT MWD CNTS . 1 68 8 3 .
RHOB MWD G/CM 4 1 68 12 4
DRHO MWD G/CM 4 1 68 16 5
RPD MWD OHMM 4 1 68 20 6
RPM MWD OHMM 4 1 68 24 7
RPS MWD OHMM 4 1 68 28 8
RPX MWD OHMM 4 1 68 32 9
FET MWD HOUR 4 1 68 36 10
GR MWD API 4 1 68 40 11
PEF MWD BARN 4 1 68 44 12
ROP MWD FT/H 4 1 68 48 13
NPHI MWD PU-S 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 76.5 8894 4485.25 17636 76.5 8894
FCNT MWD CNTS 203.69 1408.97 582.854 1605 8004 8806
NCNT MWD CNTS 18137.4 42256.2 27833.5 1605 8004 8806
RHOB MWD G/CM 2.099 3.099 2.45072 1457 8094 8822
DRHO MWD G/CM -0.131 0.501 0.1198 1457 8094 8822
RPD MWD OHMM 0.18 2000 32.9453 17370 165 8849.5
RPM MWD OHMM 0.36 2000 21. 277 17370 165 8849.5
RPS MWD OHMM 0.22 2000 13.0101 17370 165 8849.5
RPX MWD OHMM 0.2 2000 10.5069 17370 165 8849.5
FET MWD HOUR 0.13 57.19 1.32299 17370 165 8849.5
GR MWD API 10.98 462.83 88.5944 17533 76.5 8842.5
PEF MWD BARN 1.37 7.37 2.60641 1457 8094 8822
ROP MWD FT/H 0.2 928.3 154.669 17556 116.5 8894
NPHI MWD PU-S 10.95 44.36 25.301 1605 8004 8806
First Reading For Entire File......... .76.5
Last Reading For Entire File.......... .8894
File Trailer
Service name........ .....STSLIB.OOl
Service Sub Level Name...
Version Number....... ....1.0.0
Date of Generation... ....06/04/12
Maximum Physical Record..65535
File Type................ LO
Next File Name....... ....STSLIB.002
Physical EOF
File Header
Service name........ .....STSLIB.002
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation..... ..06/04/12
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.OOl
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
2
header data for each bit run in separate files.
1
.5000
VENDOR TOOL CODE
GR
ROP
RPD
RPX
RPM
RPS
FET
$
START .TH
76.5
116.5
165.0
165.0
165.0
165.0
165.0
STOP DEPTH
3503.5
3545.0
3496.0
3496.0
3496.0
3496.0
3496.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type... .... ........ ...0
Data Specification Block Type.. ...0
Logging Direction............. ....Down
Optical log depth units...... .....Feet
Data Reference Point............ ..Undefined
Frame Spacing................... ..60 .1IN
Max frames per record........... ..Undefined
Absent value......... ... ......... .-999
Depth Units.......................
.
10-APR-05
Insite
66.37
Memory
3545.0
222.0
3545.0
.0
3.3
TOOL NUMBER
124724
59672
12.250
114.0
SPUD MUD
10.50
90.0
8.0
700
8.8
3.000
2.120
2.700
2.600
60.0
87.8
62.0
62.0
Datum Specification Bloctltub-type...o .
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RPD MWD010 OHMM 4 1 68 4 2
RPM MWD010 OHMM 4 1 68 8 3
RPS MWD010 OHMM 4 1 68 12 4
RPX MWD010 OHMM 4 1 68 16 5
FET MWD010 HOUR 4 1 68 20 6
GR MWD010 API 4 1 68 24 7
ROP MWD010 FT/H 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 76.5 3545 1810.75 6938 76.5 3545
RPD MWD010 OHMM 0.18 2000 31. 4938 6663 165 3496
RPM MWD010 OHMM 0.36 2000 31. 4853 6663 165 3496
RPS MWD010 OHMM 0.27 2000 26.4356 6663 165 3496
RPX MWD010 OHMM 0.25 2000 20.2039 6663 165 3496
FET MWD010 HOUR 0.13 5.23 0.550383 6663 165 3496
GR MWD010 API 15.47 121.36 65.2466 6855 76.5 3503.5
ROP MWD010 FT/H 6.15 928.3 189.739 6858 116.5 3545
First Reading For Entire File......... .76.5
Last Reading For Entire File.......... .3545
File Trailer
Service name........... ..STSLIB.002
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation..... ..06/04/12
Maximum Physical Record..65535
File Type.............. ..LO
Next File Name...... ... ..STSLIB.003
Physical EOF
File Header
Service name... ......... .STSLIB.003
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .06/04/12
Maximum Physical Record. .65535
File Type............ ... .LO
Previous File Name..... ..STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPM
FET
RPD
RPX
RPS
GR
3
header data for each bit run in separate files.
2
.5000
START DEPTH
3496.5
3496.5
3496.5
3496.5
3496.5
3504.0
STOP DEPTH
8046.0
8046.0
8046.0
8046.0
8046.0
8053.0
ROP
$
3545..
8090.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB!G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.............. ....0
Data Specification Block Type.....O
Logging Direction........... ... ...Down
Optical log depth units.... ..... ..Feet
Data Reference Point............ ..Undefined
Frame Spacing............. ....... .60 .1IN
Max frames per record... ......... .Undefined
Absent value........ ... .......... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
.
15-APR-05
Insite
66.37
Memory
8090.0
3545.0
8090.0
.0
75.4
TOOL NUMBER
132477
66259
8.750
3535.0
LSND
10.15
50.0
9.0
600
4.6
1. 980
1.040
2.100
2.300
73.0
145.4
73.0
73.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RPD MWD020 OHMM 4 1 68 4 2
RPM MWD020 OHMM 4 1 68 8 3
RPS MWD020 OHMM 4 1 68 12 4
RPX MWD020 OHMM . 1 68 16 5 .
FET MWD020 HOUR 4 1 68 20 6
GR MWD020 API 4 1 68 24 7
ROP MWD020 FT/H 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 3496.5 8090 5793.25 9188 3496 . 5 8090
RPD MWD020 OHMM 0.47 2000 17.9076 9100 3496.5 8046
RPM MWD020 OHMM 0.56 2000 5.62124 9100 3496.5 8046
RPS MWD020 OHMM 0.54 1728.24 3.89459 9100 3496.5 8046
RPX MWD020 OHMM 0.54 1874.06 3.95372 9100 3496.5 8046
FET MWD020 HOUR 0.14 53.19 1.23117 9100 3496.5 8046
GR MWD020 API 10.98 462.83 109.865 9099 3504 8053
ROP MWD020 FT/H 0.8 438.14 144.165 9090 3545.5 8090
First Reading For Entire File......... .3496.5
Last Reading For Entire File...... .... .8090
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .06/04/12
Maximum Physical Record. .65535
File Type... ............ .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
version Number.... ...... .1.0.0
Date of Generation...... .06/04/12
Maximum Physical Record. .65535
File Type.. ............. .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
NPHI
NCNT
FCNT
RPM
FET
RPX
RPS
RPD
GR
ROP
PEF
DRHO
RHOB
4
header data for each bit run in separate files.
3
.5000
START DEPTH
8004.0
8004.0
8004.0
8046.5
8046.5
8046.5
8046.5
8046.5
8053.5
8090.5
8094.0
8094.0
8094.0
STOP DEPTH
8134.0
8134.0
8134.0
8200.0
8200.0
8200.0
8200.0
8200.0
8200.0
8200.0
8130.5
8130.5
8130.5
$
.
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
CTN
EWR4
ALD
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
COMP THERMAL NEUTRON
Electromag Resis. 4
Azimuth. Litho-Den
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type............ ... ...0
Data Specification Block Type.....O
Logging Direction... ...... ...... ..Down
Optical log depth units.......... .Feet
Data Reference Point.......... ....Undefined
Frame Spacing................ .....60 .1IN
Max frames per record.... ....... ..Undefined
Absent value.......... ........... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
FCNT MWD030
NCNT MWD030
Size
4
4
4
Nsam Rep
1 68
1 68
1 68
Code
Units
FT
CNTS
CNTS
.
18-APR-05
Insite
66.37
Memory
8200.0
8090.0
8200.0
79.0
92.5
TOOL NUMBER
178513
100547
159439
183652
6.125
8090.0
FLO-PRO
9.05
53.0
9.5
39000
5.2
.190
.130
.100
.250
72.0
107.6
72.0
72.0
Offset
o
4
8
Channel
1
2
3
RHOB MWD030 G/CM . 1 68 12 4 .
DRHO MWD030 G/CM 4 1 68 16 5
RPD MWD030 OHMM 4 1 68 20 6
RPM MWD030 OHMM 4 1 68 24 7
RPS MWD030 OHMM 4 1 68 28 8
RPX MWD030 OHMM 4 1 68 32 9
FET MWD030 HOUR 4 1 68 36 10
GR MWD030 API 4 1 68 40 11
PEF MWD030 BARN 4 1 68 44 12
ROP MWD030 FT/H 4 1 68 48 13
NPHI MWD030 PU-S 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 8004 8200 8102 393 8004 8200
FCNT MWD030 CNTS 203.69 634.28 362.986 261 8004 8134
NCNT MWD030 CNTS 18137.4 30215.5 22096.2 261 8004 8134
RHOB MWD030 G/CM 2.176 2.523 2.36197 74 8094 8130.5
DRHO MWD030 G/CM -0.005 0.383 0.0720405 74 8094 8130.5
RPD MWD030 OHMM 2.85 2000 544.054 308 8046.5 8200
RPM MWD030 OHMM 0.74 2000 289.975 308 8046.5 8200
RPS MWD030 OHMM 0.22 1594.6 13 . 183 308 8046.5 8200
RPX MWD030 OHMM 0.2 1593.17 12.1811 308 8046.5 8200
FET MWD030 HOUR 0.75 57.19 17.4208 308 8046.5 8200
GR MWD030 API 48.37 91. 45 69.7203 294 8053.5 8200
PEF MWD030 BARN 1. 57 2.57 1.80365 74 8094 8130.5
ROP MWD030 FT/H 4.94 155.18 61.7879 220 8090.5 8200
NPHI MWD030 PU-S 22.28 44.36 33.1388 261 8004 8134
First Reading For Entire File......... .8004
Last Reading For Entire File.......... .8200
File Trailer
Service name........ .....STSLIB.004
Service Sub Level Name...
Version Number..... .... ..1.0.0
Date of Generation..... ..06/04/12
Maximum Physical Record..65535
File Type............... .LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .06/04/12
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
5
header data for each bit run in separate files.
4
.5000
START DEPTH
STOP DEPTH
DRHO 8131.. 8822.0 .
RHOB 8131. 0 8822.0
PEF 8131. 0 8822.0
NPHI 8134.5 8806.0
NCNT 8134.5 8806.0
FCNT 8134.5 8806.0
GR 8200.5 8842.5
RPM 8200.5 8849.5
RPD 8200.5 8849.5
RPX 8200.5 8849.5
FET 8200.5 8849.5
RPS 8200.5 8849.5
ROP 8200.5 8894.0
$
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
CTN
EWR4
ALD
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
COMP THERMAL NEUTRON
Electromag Resis. 4
Azimuth. Litho-Den
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type........... .......0
Data Specification Block Type.....O
19-APR-05
Insite
66.37
Memory
8894.0
8200.0
8894.0
83.1
91. 8
TOOL NUMBER
178513
100547
159439
183652
6.125
8090.0
Flo-pro
9.10
50.0
9.0
33000
4.8
.190
.120
.100
.250
72 .0
118.0
72.0
72.0
L . ., .
ogglng Dlrectlon........ ........ . Down
Optical log depth units.......... .Feet
Data Reference Point. ........... ..Undefined
Frame Spacing........... ......... .60 .1IN
Max frames per record.... ....... ..Undefined
Absent value............. ....... ..-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
.
Service Order
Units
FT
CNTS
CNTS
G/CM
G/CM
OHMM
OHMM
OHMM
OHMM
HOUR
API
BARN
FT/H
PU-S
Size
4
4
4
4
4
4
4
4
4
4
4
4
4
4
Nsam Rep
1 68
1 68
1 68
1 68
1 68
1 68
1 68
1 68
1 68
1 68
1 68
1 68
1 68
1 68
Code
Offset
o
4
8
12
16
20
24
28
32
36
40
44
48
52
Channel
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Name
DEPT
FCNT
NCNT
RHOB
DRHO
RPD
RPM
RPS
RPX
FET
GR
PEF
ROP
NPHI
MWD040
MWD040
MWD040
MWD040
MWD040
MWD040
MWD040
MWD040
MWD040
MWD040
MWD040
MWD040
MWD040
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 8131 8894 8512.5 1527 8131 8894
FCNT MWD040 CNTS 306.21 1408.97 625.552 1344 8134.5 8806
NCNT MWD040 CNTS 19089.6 42256.2 28947.7 1344 8134.5 8806
RHOB MWD040 G/CM 2.099 3.099 2.45547 1383 8131 8822
DRHO MWD040 G/CM -0.131 0.501 0.122355 1383 8131 8822
RPD MWD040 OHMM 2.59 1751. 64 24.5491 1299 8200.5 8849.5
RPM MWD040 OHMM 2.51 149.47 14.8798 1299 8200.5 8849.5
RPS MWD040 OHMM 2.29 35.6 7.96293 1299 8200.5 8849.5
RPX MWD040 OHMM 1. 88 24.25 6.27794 1299 8200.5 8849.5
FET MWD040 HOUR 0.69 12.12 2.11238 1299 8200.5 8849.5
GR MWD040 API 45.2 81. 87 66.8508 1285 8200.5 8842.5
PEF MWD040 BARN 1.37 7.37 2.64936 1383 8131 8822
ROP MWD040 FT/H 0.2 523.94 64.9093 1388 8200.5 8894
NPHI MWD040 PU-S 10.95 31.71 23.7789 1344 8134.5 8806
First Reading For Entire File.... ..... .8131
Last Reading For Entire File..... .... ..8894
File Trailer
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number... ..... ...1.0.0
Date of Generation...... .06/04/12
Maximum Physical Record. .65535
File Type.. ............. .LO
Next File Name...... .....STSLIB.006
Physical EOF
Tape Trailer
Service name.......... ...LISTPE
Date. . . . . . . . . . . . . . . . . . . . .06/04/12
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name.... ........... . UNKNOWN
Continuation Number... ...01
Next Tape Name......... .~KNOWN 4IÞ
Comments................ .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .06/04/12
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File