Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout205-022CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: NOT OPERABLE: Produced Water Injector MPU K-22 (PTD# 205022) Date:Tuesday, January 10, 2023 9:26:00 AM From: Jerimiah Galloway <Jerimiah.Galloway@hilcorp.com> Sent: Friday, December 30, 2022 11:21 AM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: David Haakinson <dhaakinson@hilcorp.com> Subject: NOT OPERABLE: Produced Water Injector MPU K-22 (PTD# 205022) Mr. Wallace, Produced Water Injector MPU K-22 (PTD# 205022) will not be brought online due to operational constraints at this time. The well is now classified as NOT OPERABLE for missing its 2018 regulatory MIT-IA. Please respond if there are any comments or concerns. Jerimiah Galloway MPU/Islands Well Integrity Engineer Email: jerimiah.galloway@hilcorp.com O: (907)564-5005 C: (828)553-2537 From: Jerimiah Galloway Sent: Tuesday, December 20, 2022 8:06 AM To: 'Wallace, Chris D (DOA)' <chris.wallace@alaska.gov>; Regg, James B (CED) <jim.regg@alaska.gov> Cc: David Haakinson <dhaakinson@hilcorp.com> Subject: OPERABLE: Produced Water Injector MPU K-22 (PTD# 205022) Mr. Wallace, Produced Water Injector MPU K-22 (PTD# 205022) was made NOT OPERABLE due to missing the AOGCC witnessed MIT-IA November 2021. On 12/19/2021, a passing pre-injection MIT-IA was conducted. The well is now classified as OPERABLE and will be returned to injection. Once injection is stabilized, an AOGCC witnessed MIT-IA will be scheduled. Please respond if there are any comments or concerns. Jerimiah Galloway MPU/Islands Well Integrity Engineer Email: jerimiah.galloway@hilcorp.com O: (907)564-5005 C: (828)553-2537 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: OPERABLE: Produced Water Injector MPU K-22 (PTD# 205022) Date:Tuesday, December 20, 2022 9:34:53 AM From: Jerimiah Galloway <Jerimiah.Galloway@hilcorp.com> Sent: Tuesday, December 20, 2022 8:06 AM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: David Haakinson <dhaakinson@hilcorp.com> Subject: OPERABLE: Produced Water Injector MPU K-22 (PTD# 205022) Mr. Wallace, Produced Water Injector MPU K-22 (PTD# 205022) was made NOT OPERABLE due to missing the AOGCC witnessed MIT-IA November 2021. On 12/19/2021, a passing pre-injection MIT-IA was conducted. The well is now classified as OPERABLE and will be returned to injection. Once injection is stabilized, an AOGCC witnessed MIT-IA will be scheduled. Please respond if there are any comments or concerns. Jerimiah Galloway MPU/Islands Well Integrity Engineer Email: jerimiah.galloway@hilcorp.com O: (907)564-5005 C: (828)553-2537 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Kaitlyn Barcelona Hilcorp North Slope, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 564-4389 E-mail: kaitlyn.barcelona@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: DATE: 05/17/2022 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU K-22 (PTD 205-022) MFC 05/03/2022 Please include current contact information if different from above. PTD:205-022 T36628 Kayla Junke Digitally signed by Kayla Junke Date: 2022.05.18 10:07:24 -08'00' • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday,November 08,2017 TO: Jim Regg / P.I.Supervisor y' it I e/i SUBJECT: Mechanical Integrity Tests (( 66t HILCORP ALASKA LLC K-22 FROM: Bob Noble MILNE PT UNIT K-22 Petroleum Inspector Src: Inspector Reviewed By:p,, P.I.Supry NON-CONFIDENTIAL Comm Well Name MILNE PT UNIT K-22 API Well Number 50-029-23249-00-00 Inspector Name: Bob Noble Permit Number: 205-022-0 Inspection Date: 11/7/2017 Insp Num: mitRCN171108052619 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well K-22 1Type Inj 1 W 'TVD 7023 Tubing 891 899 " 892 - 889 PTD 2050220 Type Test SPT ,Test psi 1756 IA 68 2015 1970 - 1962 " BBL Pumped: 2.3 BBL Returned: 2.2 ' OA 137 458 - 440 429 Intervals 4YRTST P/F P Notes: 'CANNED F*R 2 Wednesday,November 08,2017 Page 1 of 1 · . Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~ 05 - () d ~ Well History File Identifier Organizing (done) o Two-sided 1111111111111111111 o Rescan Needed 1111111111111111111 RESCAN ~color Items: ~reYSCale Items: \ f~ o Poor Quality Originals: DIGITAL DATA ~iskettes, No.d-.. o Other, No/Type: OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) o Other: o Logs of various kinds: NOTES: Dale & Irð /0 7 I I o Other:: BY: ~ 151 mp Project Proofing 1111111111111111111 Scanning Preparation 151 mf BY: ~ + ~ U = TOTAL PAGES '6£+ ~nt does not include cover sheet) 151 ~ BY: Date: Production Scanning 1111111111111111111 Stage 1 Page Count from Scanned File: ~ Ò (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: ~ES ~ Date: b 1131 0 7 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Isl (Y1f NO Stage 1 BY: Maria Date: Isl 1111111111111111111 Scanning is complete at this point unless rescanning is required. ReScanned 1111111111111111111 BY: Maria Date: 151 Comments about this file: Quality Checked 11I1111111111111111 10/6/2005 Well History File Cover Page.doc • • by BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 SLANNEi J FEB Mr. Tom Maunder 9..,, Alaska Oil and Gas Conservation Commission • ' 2:2-- 333 West 7 Avenue Anchorage, Alaska 99501 V' �,_ Subject: Corrosion Inhibitor Treatments of MPK -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPK -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) MPK 10/2912011 1 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor! Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft • al MPK -02 1960810 50029226750000 0.2 NA 0.2 NA 5.1 9/5/2011 MPK -05 1960680 50029226700000 1.9 NA 1.9 NA 17.9 8124/2011 MPK-06 1961910 50029227250000 1.5 NA 1.5 NA 8.5 812712011 MPK-09 2050140 50029232470000 1.9 NA 1.9 NA 12.8 8/24/2011 MPK -13 1960400 50029226550000 1.7 NA 1.7 NA 14.5 8/24/2011 MPK -17 1960280 50029226470000 1 NA 1 NA 2.6 8/2412011 MPK -18A 1970270 50029227330100 4.6 NA 4.6 NA 23.8 8/27/2011 MPK -21A 2031620 50029227180100 0.4 NA 0.4 NA 6.9 10/29/2011 "-"", MPK -22 2050220 50029232490000 2 NA 2 NA 5.1 8/27/2011 MPK -25 1960320 50029228500000 4.2 NA 4.2 NA 30.6 8/24/2011 MPK-30 1961680 50029227110000 1.5 NA 1.5 NA 17.0 8/25/2011 MPK-33 1962020 50029227290000 1.7 NA 1.7 NA 15.3 8/24/2011 MPK -34 1961690 50029227120000 2.5 NA 2.5 NA 25.5 8/25/2011 MPK-37 1960760 50029226740000 2 NA 2 NA 17.0 8/24/2011 MPK -38 1960300 50029226490000 3.2 NA 3.2 NA 15.3 8/2512011 MPK -43A , 1970410 50029227380100 1.7 NA 1.7 NA 13.6 9/16/2011 NOT OPERABLE: MPK-22 (PTD~050220) Incapable of injection at this t~e Page 1 of 1 Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] ~~ i~(~~Z~ Sent: Saturday, September 19, 2009 8:47 PM r'~ `% To: NSU, ADW Well Integrity Engineer; Regg, James B(DOA); Maunder, Thomas E(DOA); MPU, Well Operations Supervisor; MPU, Wells Ops Coord; MPU, Production Optimization Engineer; MPU, Wells Ops Coord2; MPU, Area Manager; NSU, ADW Well Operations Supervisor; Engel, Harry R; Rossberg, R Steven Cc: NSU, ADW Well Integrity Engineer; Boeger, J Reed Subject: NOT OPERABLE: MPK-22 (PTD#2050220) Incapable of injection at this time All, / Well MPK-22 (PTD#2050220) 4-year regulatory compliance testing is due on 09/20/09. The produced water injection on MPK-Pad will remain down through at least the end of the year. Since the well is incapable of , injection it has been reclassified as Not Operable and will remain shut-in until injection is restored. Please call with any questions or concerns. Thank you, Torin Roschinger (alt. Anna Dube) Well Integrity Coordinator Office (907) 659-5102 Cell (406) 570-9630 Pager (907) 659-5100 Ext. 1154 ~F~e"L9~~~~ ~`~,.~ ;i ~UI.~~J 11/5/2009 • • ~~~n: .., '• ~ 03/01/2008 DO NUT PLACE. ANY NEW MATERIAL UNDER THIS PAGE F:1LaserFict~\CvrPgs_InsertslMicrafilm Ma~,er.c~c ~ I ~ DATA SUBMITTAL COMPLIANCE REPORT 5/2/2007 ~~~ 8 ~h.{}S- API No. 50-029-23249-00-00 Permit to Drill 2050220 MD 8894 Well Name/No. MILNE PT UNIT KR K-22 Operator BP EXPLORATION (ALASKA) INC TVD 7135 "../ Completion Date 4/21/2005 Completion Status 1WINJ Current Status 1WINJ UIC Y REQUIRED INFORMATION Mud log No Samples No Directional Survey Yes ~~,-_.~"--~._-"--- -- ~~-~ DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, IFR/CASANDRA, RES, ASI, SCMT, GURO, CCl Well Log Information: (data taken from logs Portion of Master Well Data Maint Name Directional Survey Directional Survey S~es (¡..-b b.J "l Interval e Log Log Run OH/ Scale Media No Start Stop CH Received Comments 0 8894 Open 7nt2005 Definitive I 0 8894 Open 7nt2005 MWD 5 Col 3450 7930 Case 8/30/2005 ULTRA SONIC IMAGING I lOG w/PDC GR 1-4 115 8894 Open 5/10/2006 ROP DGR EWR 8-Apr- 2005 1-4 115 7135 Open 5/10/2006 DGR EWR 8-Apr-2005 1-4 115 8894 Open 5/10/2006 CTN AlD DGR 8-Apr-2005 76 8273 Open 5/10/2006 GR, EWR4, ASI, CNP, SlD, ROP PS1 76 8273 Open 5/10/2006 76 8842 Open 5/10/2006 I i I - 76 8842 Open 5/10/2006 GR ASI eNP SLD ROP J 76 8252 Open 5/10/2006 GR, ROP, FET, NPHI, RHOS, PB1 76 8822 Open 5/10/2006 GR, ROP, FET, NCNT, NPHI, RHOB -~~- . -- Sample Interval Set Start Stop Sent Received Number Comments Log/ Data Type Electr Digital Dataset Med/Frmt Number o Asc ~ ';"'ED C Pdf C Pdf C Pdf ~ to to . C Lis D Lis D lis C Lis 13875 I nd u ction/Resistivity 13875 Induction/Resistivity 13875 I nd uction/Resistivity 13882 I nd uction/Resistivity 13882 LIS Verification 13883 LIS Verification 13883 Induction/Resistivity 13875 I nd uction/Resistivity 13875 I nd uction/Resistivity Well Cores/Samples Information: Name Permit to Drill 2050220 MD 8894 TVD 7135 ADDITIONAL INFORMA:(ION , f"'.. Well Cored? Y ~ Chips Received? YiN"" Analysis "rf1\¡ Received? DATA SUBMITTAL COMPLIANCE REPORT 5/2/2007 Well Name/No. MILNE PT UNIT KR K-22 Operator BP EXPLORATION (ALASKA) INC Completion Date 4/21/2005 Current Status 1WINJ Completion Status 1WINJ Daily History Received? (0/N L}/N Formation Tops e API No. 50-029-23249-00-00 UIC Y --~------ Comments: Compliance Reviewed By: _ -lL Date: P-~ flit) ~"7 e . . ()1 c... é)OS - 0 d d WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West ih Avenue, Suite 100 Anchorage, Alaska 99501 May 1, 2006 RE: MWD Formation Evaluation Logs: MPK-22 & PB1, AK-MW-3642743 MPK-22 & PBl: Digital Log Images: 50-029-23249-00, 70 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro technical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: ,~/ II ( Cb I ~, Signed: C~- _Qt-. {, '- 1'3~~ :;;OQ-Ò9~ . . WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Cornm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 9950 I April 12, 2006 RE: MWD Fonnation Evaluation Logs MPK-22 PBl, AK-MW-3642743 1 LIS fonnatted Disc with verification listing. API#: 50-029-23249-70 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Date: ó/st n {. Signed: {!, ¿t 9DÕ -() ~ a.. ~ '3 rt~ . I 31Jt3 . ()~ ~O()d. .. WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 April 12, 2006 RE: MWD Formation Evaluation Logs MPK-22, AK-MW-3642743 1 LIS formatted Disc with verification listing. API#: 50-029-23249-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Date: s- /I")! 0" Signed: (l.lL- .;lÐo -D~~ \~trt3 , I STATE OF ALASKA .. ALASKA L AND GAS CONSERVATION COM~ION WELL COMPLETION OR RECOMPLETION REPORT AND ~Qfia Oil & Gas Coni, Commi§§í@n Revision: ~'tart Injection v RI::L;t:IVt::O NOV 2 1 2005 1a. Well Status: D Oil DGas D Plugged D Abandoned D Suspended DWAG 1b. Well Class: 20AAC 25.105 20AAC 25.110 D Development D Exploratory DGINJ 181 WINJ D WDSPL No. of Completions One Other D Stratigraphic 181 Service 2. Operator Name: 5. Date Camp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 4/21/2005 205-022 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 4/8/2005 50- 029-23249-00-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 4/19/2005 MPK-22i 3661' NSL, 1987' WEL, SEC. 03, T12N, R11E, UM 8. KB Elevation (ft): 15. Field I Pool(s): Top of Productive Horizon: 2425' NSL, 3531' WEL, SEC. 03, T12N, R11E, UM 62.45 Milne Point Unit! Kuparuk River Sands Total Depth: 9. Plug Back Depth (MD+ TVD) 1780' NSL, 4118' WEL, SEC. 03, T12N, R11 E, UM 8894 + 7135 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 584569 y- 6005796 Zone- ASP4 8894 + 7135 Ft ADL375133 TPI: x- 583041 y- 6004544 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit: Total Depth: x- 582463 y- 6003893 Zone- ASP4 N/A MD -- --- -- ------ 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey DYes 181 No NI A MSL 1800' (Approx.) 21. Logs Run: MWD , GR , IFR/CASANDRA , RES, ABI , SCMT , GYRO, CCL 2. CASING, LINER AND CEMENTING RECORD CASING SETTING EPTH MD SETTING DEPTH TVD HOLE <~OuNT SIZE WT. PER FT. GRADE TOP troTTOM lOP I troTrOM SIZE CEMENTING RECORD PULLED 20" 94# H-40 35' 114' 35' 114' 42" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 35' 3535' 35' 3535' 12-1/4" 447 sx AS Lite, 327 sx 'G' 7" 26# L-80 33' 8090' 33' 7086' 8-3/4" 195 sx Class 'G' 4-1/2" 12.6# L-80 7942' 8894' 7049' 7135' 6-1/4" Uncemented Slotted Liner 23. Perforations op'en to Production (MD + TVD of Top and 24. T JBlNG Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Slotted Liner 3-1/2",9.3#, L-80 7949' 7844' MD TVD MD TVD 7972' - 8644' 7056' - 7125' 25. ACID, FRACTURE, CEMENT SaUEEZE, ~C;. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 80 Bbls MeOh 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): October 19, 2005 Water Injection Date of Test Hours Tested PRODUCTION FOR Oll-Bsl GAs-McF WATER-Bsl CHOKE SIZE I GAS-Oil RATIO TEST PERIOD ... Flow Tubing Casing Pressure CALCULATED + Oil -BSl GAs-McF WATER-Bsl Oil GRAVITY-API (CORR) Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None R8DMS 8Ft .2 3 Z005 Form 10-407 Revised 12/20'f) n. ,. G I f.. ',', A· to NTINUED ON REVERSE SIDE ,.- K". ì \. .( .",,',.' ~ 28. GEOLOGIC MARKERS 29. RMATION TESTS .. NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". TKLB 7129' 6643' None TLGM 7178' 6675' TKUP 7414' 6826' TKUD 7414' 6826' TKC1 8013' 7067' 30. List of Attachments: Post Rig Summary 31. I hereby certify that the f egoing is true and correct to the best of my knowledge. Signed Title Technical Assistant Date l \ - l CS -oS MPK-22i Well Number Prepared By Name/Number: Drilling Engineer: Sondra Stewman, 564-4750 Walter Quay, 564-4178 205-022 Permit No. I A roval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state 'None". Form 1 0-407 Revised 12/2003 Submit Original Only . . MPK-22i Milne Point Unit / Kuparuk River Sands 50-029-23249-00-00 205-022 Accept: Spud: Release: Ri: POST RIG WORK 05/04/05 PULL BPV. PULL BALL & ROD. PULL RHC BODY FROM 7789' MD. INITIAL SBHP. OPEN SSD. SET JET PUMP (BP-1094, 13-X). 05/07/05 FLOW BACK WELL TO CLEAN UP LINER PRIOR TO TIE-IN 05/08/05 FREEZE PROTECT AFTER FLOW BACK TO TANK. PUMPED 60 BBLS MEOH DOWN IA AND 20 BBLS MEOH DOWN TBG. 05/17/05 RECOVERED JET PUMP FROM XD @ 7,742' MDSET (BP-1109, 10A) JET PUMP W/ SOFT-SET, GAUGES OS/21/05 FREEZE PROTECT. PUMPED 60 BBLS MEOH DOWN IA AND 20 BBLS MEOH DOWN TBG. OS/28/05 PULLED (BP-1109, 10A) JET PUMP W/ GAUGES 06/04/05 PUMP 203 BBLS INHIBITED WATER DOWN IA. FREEZE PROTECT IA W/ 60 BBLS DIESEL. RAN 3 1/2" B-SHIFTING. CLOSED SLIDING SLEEVE @ 7719' SLM 06/05/05 MIT IA TO 3500 PSI. PASSED. BLEED IA DOWN TO 0 PSI 08/18/05 WELL SUPPORT TECHS RIGGED UP AND PRESSRUE TESTED THE FLOWLINE TO 3600 PSI. TEST WAS GOOD. 09/19/05 PREP FOR AOGCC MIT-IA. INSTALL INTERGAL FLANGE & VALVE ON IA FOR MIT. 09/20/05 T/I/O=1200/290/250. (STATE WITNESS MIT IA BY JEFF JONES). MIT IA TO 2000 PSI. (PASSED). PRESSURED IA TO 2000 PSI WITH 1.8 BBLS OF DIESEL. IA LOST 60 PSI IN FIRST 15 MINUTES & o PSI IN SECOND 15 MINUTES FOR A TOTAL OF 60 PSI IN 30 MINUTES. BLEED IA PRESSURE DOWN TO 300 PSI. FWP=1250/300/320. PUMP 5 BBLS DIESEL DOWN LINE TO FLUSH MAX METER. Milne Point MIT's t ....... - e «MIT MPU E-26, E-29 MITIA 9-20-05.xls» «MIT MPU F-73 MITIA 9-20-05.xls» «MIT MftU;f(-22 MITIA 9-20-05.xls» Bob, The three wells E-26/ E-29/ F-73 were four year MIT's and K-22 was the Initial. You may already have the information from the K-22 well. Joe, Had E-Mail issue yesterday that prevented this information being sent. Thanks, Mark O'Malley ACT!MPU Well Ops Coord. Office: 670-3387 Cell: 659-0560 e-mail: omallemd@bp.com 0.,., \~~[...~¡¡;;;'\', 12'~ t;~\\"(j~'(\u;,,' i':J)",,,l4· MIT MPU E-26, E-29 MITIA .. MIT MPU E-26, E-29 MITIA Content-DescnptIon: 9-20-05.xIs Content-Type: Content-Encoding: app lication/vnd.ms-excel base64 Content-Description: MIT MPU F-73 MITIA 9-20-05.xls MIT MPU F-73 MITIA 9-20-05.xls Cont,ent-Type: appIication/vnd.ms-excel Cont1ent-Encoding: base64 Contl~nt-Description: MIT MPU K-22 MITIA 9-20-05.xls MIT MPU K-22 MITIA 9-20-05.xls Contlmt- Type: application/vnd.ms-excel Content-Encoding: base64 1 of I 9/27/20058:56 AM ~ MEMORANDUM e e State of Alaska . Alaska Oil and Gas Conservation Commission TO: Jim Regg P.I. Supervisor ~11 C¡13è/œ5' DATE: Wednesday, September 21,2005 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC K-22 MILNE PT UNIT KR K-22 Src: Inspector Reviewed By: P.I. Suprv -5lJ,ß- Comm FROM: Jeff Jones Petroleum Inspector NON-CONFIDENTIAL Well Name: MILNE PT UNIT KR K-22 API Well Number 50-029-23249-00-00 Inspector Name: Jeff Jones Insp Num: mitlJ050921085525 Permit Number: 205-022-0 Inspection Date: 9/20/2005 ReI Insp Num Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well K-22 ¡Type Inj. ¡wI TVD 7023 I IA I 290 2000 1940 , 1940 i I P.T. 2050220 ITypeTest i SPT I Test psi 1755.75 ! OA 250 380 340 i 320 : I INITAL P Tubing i 1200 1250 1250 ! 1250 I Interval PIF ì Notes 1 well house inspected; no exceptions noted. Wednesday, September 21,2005 Page 1 of 1 , e e STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test OPERATOR: FIELD I UNIT I PAD: DATE: OPERATOR REP: AOGCC REP: BP Exploration (Alaska) Inc. Milne Point UnitlK-Pad 09/20/05 Jeff Rea Jeff Jones % .t'~. Email to:Winton_Aubert@admin.state.ak.us;Bob_Fleckenstein@admin.state.ak.us;Jim_Regg@admin.state.ak.us I Pass Well P.T.D. Notes: Well P.T.D. Notes: Well P.T.D. Notes: Well P.T.D. Notes: Test Details: TYPE INJ Codes F = Fresh Water Inj G = Gas Inj S = Salt Water Inj N = Not Injecting TYPE TEST Codes M = Annulus Monitoring P = Standard Pressure Test R = Internal Radioactive Tracer Survey A = Temperature Anomaly Survey D = Differential Temperature Test INTERVAL Codes I = Initial Test 4= Four Year Cycle V = Required by Variance T = Test during Workover o = Other (describe in notes) Notes: If the test was not AOGCC witnessed, leave the "AOGCC REP:" box blank. MIT Report Form Revised: 06/19/02 MIT MPU K-22 MITIA 9-20-05.xls ." I ~ 3 1/8" - 5M FMC Wellhead: 11" x 3.5" 5M Gen 5 wI 3.5" TC-II T&B Tubing Hanger CIW "H" BPV profile 20" x 34" insulated, 215 #Ift A-53 c:ÐLJ 95/8" 40 ppf L-80 BTC 7" 26# L-BO IBT-M casing ( drift ID = 6.151", cap = .0383 bpf) (cap = .0264 bpf wi 3 112" tbg inside) 3.5" 9.3# L-80 IBT-M tubing ( drift ID = 2.867", cap = .0087 bpf ) Baker Tie Back Sleeve Baker ZXP Liner Top Packer Baker 7" x 5" HMC Liner Hanger 7" Weatherford Float Collar 8004' 7" Weatherford Float Shoe 8090' DATE MPK-22 /3535'1 W: REV. BY COMMENTS 4/21/05 Lee Hulme Drilled and Completed - Doyon 14 On . DF elev. = 62.50' (Doyon 14) Orig. GL. elev.= 30.72' (Doyon 14) KOP @ 180' Hole angle passes 50 degrees @ 6250' Max angle in tubing = 75 degree 70 degrees at sliding sleeve 3.5" HES X-Nipple (2.813" Pkg ID ) 13004' 3.5" HES 'XO' Dura Sliding Sleeve 2.813" ID ( Opens down) 17742'1 3.5" HES X-Nipple (2.813" Pkg ID ) 17795'1 7 x 3.5" Baker Premier Packer ( 2.875" ID ) /7844'/ 3.5" HES XN-Nipple (2.813" Pkg ID, 2.75" No Go) 17899'/ WLEG wI 4.75 No-Go OD 17949'1 0' 22 jts - 41/2", 12.6#/ft Solid & Slotted Liner Rat hole Btm HES 4 112" Float Shoe 8894' 6 1/8" Hole td @ 8894' (7135' tvd) MILNE POINT UNJJ~ WELL MPK-22 API NO: 50-029-23249-00 BP EXPLORATION (AK) A-1l1¥'H- ~ ~ It ç I t\t' ~ +.. I \ c""I <:'''cìq I('i Ç) ç <Çt' ç 08/30105 Scblumbepger NO. 3460 Alaska Data & Consulting Services 2525 Gambe" Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Well Job# Loa Description Date BL Color D Z-15 I 'S'd.- '.1£.'1" 11084273 PPROF W/DEFT/GHOST/CALlPER 07/08/05 1 L5-17A lcJ"/ -À.l3 11075898 MEM PPROF W/DEFT/GHOST 07/03/05 1 DS 04-26 I.~ ~--JN 11072873 PRODUCTION PROFILE 07/30/05 1 S-14A ').Öj,.f-Oll 10893047 LEAK DETECTION LOG 10/17/04 1 G-27 I :f\¡¡-If<s.. 10942221 MEM PPROF & IPROF 06/29/05 1 DS 05-20B ~ t'-j .- .J..) '1 10942220 MEM INJECTION LOG 06/26/05 1 E-37A 1. C ç - \'¡t 1.- 10928640 MEM PPROF, IPROF & WARMBACK 06/14/05 1 D-29 I ~ç- )..,rJ 11084274 RST 07/09/05 1 1 i .~;1 ~ .3 L2-28 /t~' r - ü j >- 11076453 RST 07/27/05 1 1 iJ;oo/ C-13A (q7-Jl.í~ 11075900 MCNL 07/05/05 1 1 i JJ.) r OWDW-SW/IJ C '- ). 3 ð 10893096 RST-BORAX CHANNEL DETECTION LOG 03/24/05 1 1 jJ .1.}. (¡. 06-08A 1 q r- '1 )- 11062628 RST 05/17/05 1 1 13~;¡ 7 12-29 J ,Y'i - t,) '1- 11072867 RST 07/07/05 1 1 n :u.8 C-19BÀ\;":'- ût, 'r 10928632 MCNL 05/12/05 1 1 J? 2. ;;U/ G-21 HI\¡- /1 (,¡¡ 10942221 MCNL 06/29/05 1 1 I ~ 1 >~ F-02A ?.¢~--c ~(f.j 10928630 MCNL 05/08/05 1 1 13J..3; 03-33B )C5- - GIS 10913011 US IT PDC-GR 03/19/05 1 1 ,"',). ~ ).." MPK·22 ~Ù5-:.. Ü)..2.. 10893106 USIT 04/20/05 1 C . . BP Exploration (Alaska) Inc, Petrotechnical Data Center LR2-1 900 E. Senson Blvd. Anchorage, Alaska 99508 Date Delivered: ~) / f~ :(,.~'\\ \ -~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 995.g3-138 ..-.,') 'W"'. . ' ATTN: Beth / 2r~r / j"! // I (f' Received by: \f'f .'0>. U I Re: MPK-22 (205-022) injector...OK to begin injection It e Harry, Your message confinns our discussion regarding MPK-22. The operations report indicates that the primary cementing operation was perfonned without problems and the pipe was moved throughout the operation. When the bond log was run, there is an interpretation provided in the report. The tubing and IA were reported to be satisfactorily pressure tested when the completion was run. Based on my review, BP has satisfied the requirements to begin injection into the well. After the well has "wanned" up the production people should contact the Inspector to arrange a witnessed MIT. Conducting it within a week or so would be fine, although not necessary. Conducting the witnessed MIT within the first month should be fine. Mutual convenience should guide when that test is done. Call or message with any questions/comments. Tom Maunder, PE AOGCC Engel, Harry R wrote, On 8/25/2005 2:38 PM: Jennifer et al... I just spoke with Tom Maunder, AOGCC, regarding this injector. Tom reviewed the completion report and found: . it provides sufficent detail to support good cement quality . Initial MIT's were conducted during the completion Our field folks must notify the AOGCC inspectors to arrange a post MIT after injection begins... .ususally within 1 week. We need to confirm that the bond log was in fact submitted to the AOGCC. Tom authorized injection into the well. Harry 1 of 1 8/25/20053:03 PM . . 14-Jun-05 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well MPK-22 Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 8,894.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518'71 / ¡J j Date ì J "'-~ ~~ li Signed Þ~J OiL Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) fil.- )~r-~".:\.. L . . 14-Jun-05 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPK-22 MWD Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 8,894.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 <0 / /1 ¡)fl ¿ ¿ . Date 7JrS-Z()(ì Signed ...~ (~ Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) hl~ ^cn"-~À-l... A STATE OF ALASKA - RF ALASKAllllfL AND GAS CONSERVATION COM~ION ' .*"'''' WELL COMPLETION OR RECOMPLETION REPORT AND LOG MAY 2; Ô 2005 ,".~~<;:k;:¡ Q¡j F,; ¡ift¡; l;ï¡niL 1a. Well Status: D Oil DGas D Plugged D Abandoned D Suspended DWAG 1b. Well Class: fr(hm~~rjl} 20MC 25.105 20MC 25.110 D Development' 't:i'Explõ;atory DGINJ IS! WINJ D WDSPL No. of Completions One Other D Stratigraphic IS! Service 2. Operator Name: 5. Date Camp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 4/21/2005 / 205-022 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 4/8/2005 , 50- 029-23249-00-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: / 4/19/2005 MPK-22i 3661' NSL, 1987'WEL, SEC. 03, T12N, R11E, UM 8. KB Elevation (ft): 15. Field I Pool(s): Top of Productive Horizon: 2425' NSL, 3531' WEL, SEC. 03, T12N, R11 E, UM 62.45 Milne Point Unit I Kuparuk River Sands Total Depth: 9. Plug Back Depth (MD+ TVD) 1780' NSL, 4118' WEL, SEC. 03, T12N, R11E, UM 8894 + 7135 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: 8894 + 7135 .I Ft ADL375133 Surface: x- 584569 ~ y- 6005796' Zone- ASP4 / TPI: x- 583041 y- 6004544 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit: Total Depth: x- 582463 y- 6003893 Zone- ASP4 N/A MD 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey IS! Yes DNa N/A MSL 1800' (Approx.) 21. Logs Run: MWD , GR , IFRlCASANDRA , RES, ABI , SCMT , GYRO, CCL 22. CASING, LINER AND CEMENTING RECORD CASING ::iETTING PEPTHMO·.·. ::iETTING l EPTH TVD HOLE AMOUNT SIZE WT. PER FT. GRADE TOP I BOTTOM TOP . BOTTOM SIZE CEMENTING RECÓRD PUllED 20" 94# H-40 35' 114' 35' 114' 42" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 35' 3535' 35' 3535' 12-1/4" 447 sx AS Lite, 327 sx 'G' 7" 26# L-80 33' 8090' 33' 7086' 8-3/4" 195 sx Class 'G' 4-1/2" 12.6# L-80 7942' 8894' 7049' 7135' 6-1/4" Uncemented Slotted Liner 23. Perforations 0Ren to Production (MD + TVD of Top and 24. TUBING. RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Slotted Liner 3-1/2", 9.3#, L-80 7949' 7844' MD TVD MD TVD 7972' - 8644' 7056' - 7125' -' 25. ACID,fRAC:;f'ljRE,GEMENT SQU!:E!?E, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 80 Bbls MeOh 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production " N/A Date of Test Hours Tested PRODUCTION FOR Oll-BSl GAs-McF W A TER-BSl CHOKE SIZE GAS-Oil RATIO TEST PERIOD ... Flow Tubing Casing Pressure CALCULATED ... Oll-Bsl GAs-McF W A TER-BSl Oil GRAVITY-API (CORR) Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none", None .J RBDMS BFL MAY 2 [} 2005 r[i"f ¿j.:.1:1.-:S?$_ 7Þ'~".. GF Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE 28. GEOLOGIC MARKERS 29. ORMATION TESTS Include and briefly summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". TKLB 7129' 6643' None TLGM 7178' 6675' TKUP 7414' 6826' TKUD 7414' 6826' TKC1 8013' 7067' 30. list of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys, Well Service Report and a Leak-Off Test Summary. end correct to the best of my knowledge. Signe Title Technical Assistant Date MPK-22i Well Number Prepared By Name/Number: Drilling Engineer: Sondra Stewman, 564-4750 Walter Quay, 564-4178 205-022 Permit No. I A roval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPK-22 MPK-22 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 4/1/2005 Rig Release: 4/21/2005 Rig Number: Spud Date: 4/8/2005 End: 4/8/2005 07:00 - 08:30 1.50 MOB P PRE PJSM, Skid rig floor 08:30 - 11 :00 2.50 MOS P PRE Move rig off MPK-09 and move to MPK-22, spot over well 11 :00 - 13:00 2.00 MOB P PRE Skid rig floor, spot rock washer, prep pits, rig accept @ 13:00 hrs 4/8/2005 13:00 - 17:30 4.50 MOB P PRE Nipple up diverter and Diverter lines, flow lines 17:30 - 19:30 2.00 MOB P PRE Picking up HWDpipe.and stand in derrick 19:30 - 20:00 0.50 MOB P PRE Perform Accumulator and Diverter test, the right to witness test was waiver by Chuck Scheve AOGC. Test was witness by WSL 20:00 - 21 :30 1.50 DRILL P SURF Pre Spud meeting, pick up Bit and motor, float sub 21 :30 - 22:00 0.50 DRILL P SURF Fill Stack, test lines, blow down top drive, Change out flow line boot 22:00 - 23:00 1.00 DRILL P SURF Clean out ice 37' to 115' 23:00 - 00:00 1.00 DRILL P SURF Drill 115' to 222' 4/9/2005 00:00 - 00:30 0.50 DRILL P SURF Stand back HWP 00:30 - 02:30 2.00 DRILL P SURF Pickup MWD, Orient, and pickup DC 02:30 - 16:00 13.50 DRILL P SURF Drilling 222' to 1750' with 400 gpm, 1400 psi, 80 rpms, running Gyro ever 100 ft. to 600' 16:00 - 17:00 1.00 DRILL P SURF Circ bottoms up, 400 gpm 1400 psi 17:00 - 18:00 1.00 DRILL P SURF Pumping out to HWDP with full drilling rate ( wet trip called BP EMS @ 17:00) 18:00 - 19:00 1.00 DRILL P SURF Rig service, top drive 19:00 - 19:30 0.50 DRILL P SURF RIH, washed last stand to bottom 19:30 - 21 :00 1.50 DRILL P SURF Circ and raise mud wt to 10.5 21 :00 - 00:00 3.00 DRILL P SURF Drilling 1750' to 2100' with 427 gpm, 1000 psi, 80 rpms, AST 1.84, ART 8.1 4/10/2005 00:00 - 13:00 13.00 DRILL P SURF Drill 2100' to 3545' with 80 rpms 530 gpm 2800 psi, HyØrates encountered @2250 cut mud from 10.5 to 9.5 no mud over ~\mWtíi, control drill 150 ft per hr, Hydrates 2600 to 2900',cut mud from 10.5 to 9.5 no mud over drilling nipple, control drill 150 ft per hr, total of 3.5 bbls Lecithin"" mud 13:00 - 15:00 2.00 DRILL P SURF Circ., Two bottoms up with 530 gpm 2760 psi 80 rpms 15:00 - 17:00 2.00 CASE P SURF Pump out to 1700' with full drilling rate. 17:00 - 17:30 0.50 DRILL P SURF Circ out clay balls @ 1700' 17:30 - 18:30 1.00 DRILL P SURF Pump out to HWDP, 723' 18:30 - 19:30 1.00 DRILL P SURF RIH washed last stand to bottom 3545' 19:30 - 21:30 2.00 DRILL P SURF Circ, Three bottoms up 530 gpm, 2760 psi, 80 rpms 21 :30 - 00:00 2.50 DRILL P SURF Pump out to HWD pipe 4/11/2005 00:00 - 00:30 0.50 CASE P SURF Finish trip out to HWDP 00:30 - 02:30 2.00 CASE P SURF Stand back HWD pipe, lay down 8" flex DC, MWD, Motor 02:30 - 04:30 2.00 CASE P SURF PJSM, Rig up to pickup 9 5/8 csg 04:30 - 09:30 5.00 CASE P SURF PJSM, Picking up 9 5/8 40# L-80 STC csg, total 84 jts, Bridge @ 600 ft worked thru, break circ @ 2460' due to thick mud" Plu 175K, SIO 145K 09:30 - 10:00 0.50 CASE P SURF Land csg rig down franks tool, rig up cement head 10:00 - 12:00 2.00 CASE P SURF Circ 8 bbls min, 400 psi 12:00 - 15:00 3.00 CEMT P SURF Cement with Schlumberger, 5 bbls water, test line to 3,000 psi,20 bbls CW100, 50 bbls mud push Mixed @ 10.9, drop bottom plug,254 bbls- 447 sxs. type ASL- Yield 3,20 Mixed @ 11.5, tail with 327 sxs- 146 bbls DeepCRETE Cement 12.5ppg, yield 2.51, drop top plug, kicked out with 30 bbls water, cement was mixed and pumped 6 bbls min 15:00 - 16:00 1.00 CEMT P SURF Displace with rig pumps, 7 bbls min, 800 psi, bumped plug with Printed: 4/25/2005 10:03:06 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPK-22 MPK-22 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 4/1/2005 Rig Release: 4/21/2005 Rig Number: Spud Date: 4/8/2005 End: 4/11/2005 15:00 - 16:00 1.00 CEMT P SURF 1850 psi, full return thru out job, 197 bbls good cement to surface, Monitor well for 30 mins. no gas beaking out 16:00 - 19:00 3.00 CASE P SURF Rig down cement head, backed out landing jt, flush Diverter and lines, lay down landing jt., lay down csg tools 19:00 - 20:00 1.00 CASE P SURF Nipple down Diverter 20:00 - 21 :00 1.00 CASE P SURF Nipple up Csg head, test metal to metal seal to 1000 psifor 10 min. 21 :00 - 23:30 2.50 CASE P SURF Nipple up Bop stack 23:30 - 00:00 0.50 CASE P SURF Rigging up to test bops 4/12/2005 00:00 - 01 :00 1.00 CASE P SURF Rigging up to test Bops, small amount of gas breaking around conducter and hanger Smell bubbles first obServed @1900 hrs. have not increase 01 :00 - 04:30 ' 3.50 CASE P SURF Test Bops and manifold 250-3500 psi 5 min per test, hydrill 250-2500 psi 5 min per test, test was witness by Chuck Scheve AOOCC, and WSL 04:30 - 05:30 1.00 CASE P SURF Install wear ring, and rig down test equipment 05:30 - 08:30 3.00 CASE P SURF Picking up drill pipe 75 jts from pipe shed stand back in derrick 08:30 - 09:00 0.50 CASE P SURF Moblize BHA - Change out 4" DP handling equipment 09:00 - 11 :00 2.00 CASE P SURF MU Bit - Motor - MWD - Orient - Con't WIDC's - HWT - Jars - Surface test MWD 11 :00 - 12:00 1.00 CASE P SURF RIH with BHA - Picking up singles from pipe shed to 2152' 12:00 - 13:00 1.00 CASE P SURF Con't RIH from 2152' to 3415' tag float collar 13:00 - 14:00 1.00 CASE P SURF Break Circulation - CBU - 400 gp~ @1300psi 14:00 - 15:00 1.00 CASE SURF Rig up test equipment - T_;~'4'ØfOOO "slfor30 mins- Record on chart - Rig down test equipment 15:00 - 16:00 1.00 DRILL P SURF Drill float equipment - 20' new hole - from 3545' to 3565' 16:00 - 17:00 1.00 CASE P SURF Pump sweep - Displace to New 9 ppg LSND mud 17:00 - 17:30 0.50 EV AL P SURF Rig up for FIT - MD 3545' - TVD 3533' - Mud weight 9 ppg - Surface pressure 460 - EMW = 11.5 ppg- Rig down testing equipment 17:30 - 00:00 6.50 DRILL P INT1 Directional Drill from 3565' to 4325' - WOB 5 - RPM 80 - TO on 3 - off 1 - GPM 550 - PP on 1950 - off 1840 - PU 130 - SO 120 - ROT 130 4/13/2005 00:00 - 14:00 14.00 DRILL P INT1 Directional Drill from 4325' to 5793' - WOB 8 to 10 - RPM 80 - TO on 5 - off 3 - GPM 525 - PP on 2300 - off 2120 - PU 152- SO 140 - ROT 148 14:00 - 15:00 1.00 DRILL P INT1 CBU 2 X - GPM 525 - PP 2120 - RPM 80 - TO 3 15:00 - 17:00 2.00 DRILL P INT1 Pump out to shoe from 5793' to 3489' - GPM 500 - PP 1900 17:00 - 17:30 0.50 DRILL P INT1 CBU 1 X - GPM 525 - PP 1540 - RPM 40 17:30 - 18:30 1.00 DRILL P INT1 RIH from 3530 to 5793' - Precauctionary wash last stand to bottom 18:30 - 00:00 5.50 DRILL P INT1 Directional Drill from 5793' to 6273' - WOB 10 to 15 - RPM 80 - TO on 4 - off 2 - GPM 525 - PP on 3150 - off 2950 - PU 155- SO 140 - ROT 150 - (Raise mud weight with 11.8 spike fluid from 9.2 ppg to 10.1 ppg - MD 6188 TVD 6055 @ 23:00 hrs) 4/14/2005 00:00 - 00:00 24.00 DRILL P INT1 Directional Drill from 6273' to 7587' - WOB 10 to 15 - RPM 80 - TO on 5.5 - off 4.5 - GPM 525 - PP on 3420 - off 3350 - PU 166 - SO 145 - ROT 155 - (Possible fault @ 7153/7778) 4/15/2005 00:00 - 12:30 12.50 DRILL P INT1 Directional Drill from 7587' to 8030' - WOB 10 to 15 - RPM 80 - 90 - TO on 5.5 - off 4.6 - GPM 525 PP on 3550 - off 3430 - PU 163 - SO 140 - ROT 154 - T.D. 83/4" hole 12:30 - 14:00 1.50 CASE P INT1 CBU 2 X - GPM 525 - PP 3440 - RPM 90 - TO 6 14:00 - 16:00 2.00 CASE P INn Pump out from 8090' to 5700' - Pump at 500 GPM - PP 3180 Printed: 4/25/2005 10:03:06 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPK-22 MPK-22 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 4/1/2005 Rig Release: 4/21/2005 Rig Number: Spud Date: 4/8/2005 End: 4/15/2005 16:00 - 17:00 1.00 CASE P INT1 CBU - GPM 500 - PP 2880 - RPM 80 - TQ 4 17:00 - 17:30 0.50 CASE P INT1 RIH from 5700' to 8090' - Precauctionary wash last stand to bottom 17:30 - 19:30 2.00 CASE P INn CBU 3 X - GPM 525 - ICP 3650 - FCP - RPM 100 - TQ 5.5 19:30 - 23:00 3.50 CASE P INT1 Pump out from 8090' to 3500' - Pump at GPM 500 23:00 - 00:00 1.00 CASE P INT1 CBU 2 X - GPM 525 - RPM 40 - Lots of cuttings and clay over shakers 4/16/2005 00:00 - 01 :00 1.00 CASE P INT1 Cut drlg line - Top drive service - Rig service 01 :00 - 02:00 1.00 CASE P INT1 Flow Check - Well static - Pump dry job - POH from 3500' to 715' 02:00 - 04:00 2.00 CASE P INT1 LD 5" HWT - BHA - Flush I Service motor break bit - LD motor 04:00 - 04:30 0.50 BOPSU P INT1 Pull Wear ring - Install test plug 04:30 - 06:00 1.50 BOPSU P INT1 COimge toþrams to 7" - Body test to250.1ow 1500 high 5 mins each test 06:00 - 07:00 1.00 CASE P INT1 Rig Up Power Tongs And Equipment To Run 7" Casing 07:00 - 08:00 1.00 CASE P INT1 Have Safety Stand Down To Review Recent Injuries On The Slope During The First Quarter 08:00 - 11 :30 3.50 CASE P INT1 Run In Hole With 7" Casing To The 9 5/8" Casing Float Shoe At 3,534' 11 :30 - 12:00 0.50 CASE P INT1 Circulate One Casing Volume - Stage Up Pump Rates To 6 BPM With 570 Psi. 7" Casing String Pick Up Weight 130K - Slack Off Weight 125K 12:00 - 16:30 4.50 CASE P INT1 Continue To RIH With 7" 261b L-80 Casing From 3,534' To 8,090' With "No Problems" - Establish Circulation Every 30 Joints While Running In The Hole 16:30 - 17:30 1.00 CASE P INT1 Reciprocate 7" Casing While Circulating One Casing Volume Atß6PM With 860 Psi. 7" Casing String Pick Up Weight 210K - Slack Off Weight 172K 17:30 - 18:00 0.50 CASE P INT1 Rig Down The Franks Fill Up Tool - Install Cement Head And Circulating Lines 18:00 - 20:00 2.00 CASE P INT1 Circulate And Condition Mud At 6 BPM With 860 Psi. - ~rCasrng 20:00 - 21 :30 1.50 CEMT P INT1 Held PJSM With All Personal Regarding Cementing Operation - Pump 5 BBLS Water - Test Dowell Lines And Equipment To 4,000 Psi. (Test Good) - Pump 10 BBLS CW-100, Followed Up With 35 BBLS Mud Push Spacer Mixed At 11.0 PPG, Drop Bottom Plug Pump 114.9 BelS (271 Sacks) 12.0 PPG Lead Cement At 6.5 BPM. 41 BBlS (196 Sacks) 15.8 PPG Class "G" Cement At 5.75 BPM, Drop Top Plug And Kick Out With 10 BBLS Water Thru Tub - Give To Rig For Displacement 21 :30 - 22:30 1.00 CEMT P INT1 Displace With 10.1 PPG LSND Mud At 6.5 BPM - With 272 BBLS Of mud Displacement Pumped, Swapped To Water And Continued Displacement Pumping 25 BSLS - Slow Rate To 3.0 BPM With Final Circulating Pressure At 990 Psi. - Bump Plug To 2000 Psi. With A Total Of 306 BBLS Pumped - Fidlßeturns Thl'UDuratioo Of Job - Bleed Off Pressure And Verify Floats Holding - Floats holding - Cement In Place At 22:20 Hours - Aeciporocated pipe thru out job - Stopped recipl'oeðting string last 10bbls pumped - PUW 210 - SOW 165 on last pipe movement 20' 22:30 - 23:30 1.00 CASE P INT1 Flush stack - Close annular inject 50 bbls water to OA @ 3 bpmBOOpsi - Drain stack - Flow check - Well static 23:30 - 00:00 0.50 CASE P INT1 Split UNI-Head - Pick up stack - Run 70' of 1" pipe with blow Printed: 4/25/2005 10:03:06 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPK-22 MPK-22 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 4/1/2005 Rig Release: 4/21/2005 Rig Number: Spud Date: 4/8/2005 End: 4/16/2005 23:30 - 00:00 0.50 CASE P INT1 down head make up to landing joint - Rig up hose's to void fluid out of landing joint and 40' of 7" casing 4/17/2005 00:00 - 01 :00 1.00 CASE P INT1 Void 30' of 7" casg and landing joint to cut off 7" - Prepare to set slips on 7" 01 :00 - 02:00 1.00 CASE P INT1 Pick up 7" string to 240K - Last string weight while reciprocating pipe was 21 OK - set 30K on slips - Block weight 50K 02:00 - 03:00 1.00 CASE P INT1 Rig up Camron mechanical cutter - Cut 7" casg 03:00 - 05:00 2.00 CASE P INT1 Install FMC pack-off - NU BOP - test to 4300 psi for 10 mins- Test good - Freeze protect OA with 70 bbls diesef - 2.5 bpm @ 1340 psi - ShuHnpressure 1050 psi 05:00 - 07:30 2.50 CASE P INT1 Change 7" rams to 31/2" x 6" VBR - Install test plug - Test 3 1/2" x 6" VBR's 250 low 3500 high 5 mins each test - Pull test plug - Install wear ring - Close annulus valves 07:30 - 08:30 1.00 CASE P INT1 MU 6 1/8" BHA 08:30 - 09:30 1.00 CASE P INT1 Upload MWD - Surface test GPM 225 - 770 psi - PJSM handling nukes - Load nukes 09:30 - 10:00 0.50 CASE P INT1 Con't MU BHA 10:00 - 12:00 2.00 CASE P INT1 RIH from 230' to 5596' 12:00 - 13:00 1.00 CASE P INT1 Circ I Cond mud - GPM 225 - PP 900 13:00 - 14:30 1.50 CASE P INT1 RIH fom 5596' to 7994' 14:30 - 15:00 0.50 CASE P INT1 CBU 1 X - GPM 250 - PP 1710 - RPM 40 15:00 - 16:00 1.00 CASE P INT1 RU test equip - Test casg to 3500 psi - Hold for 30 mins - Record on chart - RD test equip 16:00 - 17:30 1.50 DRILL P INT1 Drill float collar - Cement - Shoe - 20' New hole from 8090' to 8110' 17:30 - 18:30 1.00 CASE P INT1 CBU 1X - GPM 250 - PP 1910 - RPM 40 18:30 - 19:30 1.00 CASE P INT1 Displace LSND mud to 9 ppg FloPro mud 19:30 - 20:30 1.00 EVAL P INT1 Rig up test equip - Preform FIT - Mud weight 9 ppg - MD 8090' - TVD - 7086' - Surface pressure 551 = EMW 10.5 ppg - RD test equip - Blow down kil!l Choke lines - Choke manifold 20:30 - 00:00 3.50 DRILL P PROD1 Directional Drill from 8110' to 8222' - WOB 10 to 15 - RPM 80 - TQ on 5 - off 4 - GPM 275 - PP on 2100 - off 1920 - PU 147- SO 125 - ROT 138 4/18/2005 00:00 - 02:30 2.50 DRILL P PROD1 Directional Drill from 8222' to 8324' - WOB 10 to 15 - RPM 80 - TQ on 5 - off 4 - GPM 250 - PP on 2100 - off 1920 - PU 147- SO 125 - ROT 138 02:30 - 03:30 1.00 DRILL P PROD1 Pull back to 8200' for open hole sidetrack - Work trough for open hole sidetrack from 8200' to 8222' 03:30 - 00:00 20.50 DRILL P PROD1 Side track @ 8200' to 8222' - Directional Drill from 8222' to 8565' - WOB 10 to 15 - RPM 80 - TQ on 3 - off 2 - GPM 250- PP on 2310 - off 1980 - PU 140 - SO 131 - ROT 138 4/19/2005 00:00 - 11 :30 11.50 DRILL P PROD1 Directional Drill from 8565' to 8894' - WOB 10 to 150 - RPM 80 " - TQ on 4 - off 3 - GPM 250 - PP on 2170 - off 1950 - PU 147- SO 125 - ROT 136 11 :30 - 12:30 1.00 CASE P PROD1 CBU 2 X - GPM 300 - PP 2470 - RPM 100 - TQ 4 - Flow Check - Well static 12:30 - 13:30 1.00 CASE P PROD1 Pump out from 8894' to 8090 - GPM 250 - PP 1960 13:30 - 14:00 0.50 CASE P PROD1 CBU 1 X @ 8070 - GPM 250 - PP 1870 - RPM 40 - Flow check - well static 14:00 - 14:30 0.50 CASE P PROD1 RIH from 8070' to 8894' - Precauctionary wash last stand to bottom 14:30 - 16:00 1.50 CASE P PROD1 CBU 3 X - GPM 300 - PP 2300 - RPM 100 - TQ 4 - Flow check Printed: 4/25/2005 10:03:06 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPK-22 MPK-22 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 4/1/2005 Rig Release: 4/21/2005 Rig Number: Spud Date: 4/8/2005 End: 4/19/2005 14:30 - 16:00 1.50 CASE P PROD1 - Well static 16:00 - 16:30 0.50 CASE P PROD1 POH - From 8894' to 8070' - GPM 250 - PP 1850 16:30 - 17:30 1.00 CASE P PROD1 CBU 1 X - GPM 250 - PP 1800 - RPM 40 - Flow check - Well static - Pump dry job 17:30 - 21 :00 3.50 CASE P PROD1 POH from 8070' - 995' - LD 24 jts 4" DP to pipe shed 21 :00 - 00:00 3.00 CASE P PROD1 LD BHA - PJSM Handling Nukes - Down load Nukes - Down load MWD - Con't LD MWD - BHA 4/20/2005 00:00 - 00:30 0.50 CASE P PROD1 Clear rig floor 00:30 - 01 :30 1.00 CASE P PROD1 RU liner running equipment 01 :30 - 02:30 1.00 CASE P PROD1 PU 4 1/2" Slotted liner - Liner weight 12K - Pump through hanger I packer 02:30 - 03:00 0.50 CASE P PROD1 Make up Hanger - ZXP packer to liner - Liner weight 12K 03:00 - 06:00 3.00 CASE P PROD1 Rih with 4 1/2" Slotted liner on 4" DP to 8090' 06:00 - 06:30 0.50 CASE P PROD1 Circ DP vol @ 3.5 bpm - 830 psi 06:30 - 07:00 0.50 CASE P PROD1 CON'T rih FROM 8090' TO 8894' 07:00 - 08:30 1.50 CASE P PROD1 Drop ball - Pump ball on seat @ 3.5 bpm @ 900 psi - PU 155 SO 137 - Ball on seat pressure up to 2000 psi set HMC Hanger - Slack off 60K to verify hanger set - PU to 120K Rotate 10 turns to the right - Release setting tool - PU to verify release - Slack off to 75K set ZXP packer - PU - Slack off 2nd time rotating 10 RPM - Close Annular pressure up to 1500 psi on annulus to verify packer set - Bleed off pressure - Open Annular 08:30 - 10:00 1.50 CASE P PROD1 Displace 9 ppg FloPro mud to 8.5 ppg seawater - Pump 35 bbl Hi-Vis spacer followed with 8.5 seawater to displace well - Pump @ 10 bpm @ 2500 psi - Reciprocated pipe while displacing 10:00 - 15:00 5.00 CASE P PROD1 POH Laying down 4" drill pipe 15:00 - 15:30 0.50 CASE P PROD1 Service break Baker Liner running tool - LD liner running tools 15:30 - 16:30 1.00 CASE P PROD1 Service Rig - Top Drive 16:30 - 18:00 1.50 CASE P PROD1 PJSM - Rig up Schlumberger Wireline tools 18:00 - 22:00 4.00 EVAL P PROD1 RIH with GRlSGMTICCLLogging tools - Log from 7930' to 3600' - (Excellent cementJrom 7930 to 6300 - marginal to fair cemem,from6300 to 39Sð - No cement from 3950 to 3600) - PQH with logging tools 22:00 - 22:30 0.50 CASE P PROD1 Rig down Lay down Schlumberger equipment and tools 22:30 - 23:00 0.50 RUNCO RUNCMP Pull wear ring - Rig up tubing equipment 23:00 - 00:00 1.00 RUNCO RUNCMP PJSM - (Running 3 1/2" completion) - PU I Run 3 1/2" 9.2# L-80 IBT-M Tubing 4/21/2005 00:00 - 07:00 7.00 RUNCO RUNCMP PU I RUN 3 1/2" L-80 IBT-M 9.2# Completion 07:00 - 07:30 0.50 RUNCO RUNCMP Space out tubing - Land tubing with TWC installed in hanger 07:30 - 08:00 0.50 RUNCO RUNCMP RILDS - Test TWC to 1000 psi 08:00 - 08:30 0.50 RUNCO RUNCMP Clear rig floor 08:30 - 10:00 1.50 RUNCO RUNCMP ND BOP's 10:00 - 12:00 2.00 RUNCO RUNCMP NU FMC 11" x 3 1/16" 5M Adapter - Test pack off to 5K - NU CIW 3 1/16" 5M Tree - Shell test tree to 5K with rig test pump- Pull TWC with dry rod 12:00 - 15:00 3.00 RUNCO RUNCMP RU circulating lines - Test to 1200 psi - Pump down annulus 69 bbls seawater - 141 bbls seawater treated with corrosion inhibitor @ 3 bpm 400 psi 15:00 - 17:00 2.00 RUNCO RUNCMP Rig up Lubricator - Test to 1000 psi - Rig up Little Red Pumping services - Test lines to 4500 psi - Pump 90 bbls diesel in annulus - @ 2.5bpm 800 psi at truck - final pressure Printed: 4/25/2005 10:03:06 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPK-22 MPK-22 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 4/1/2005 Rig Release: 4/21/2005 Rig Number: Spud Date: 4/8/2005 End: 20:00 - 22:00 2.00 RUNCO 300 psi U-tube diesel from annulus to tubing - Drop ball RU Hot oil truck to tubing- Test Iirwsto4500 p6i - Pressure up to 2500 psi on tubing to. set packer - fncrea-se to. 4000 p6i - Ho.ld for 30 minBon Chart - Monitoring annulus pressure - Ble~Qtf,to100psi - Rig hot oil truck to. annulus - Test lines to 4000 psi - Pressure up to 3500 psi - Hold for 30 mins on chart - Monitoring tubing pressure - Bleed off pressure on annulus - suck out lines RUNCMP Rig down lubricator - Rig up Lubricator to install BPV - Install BPV - Rig down lubricator - Suck o.ut all lines - Rig down test lines and equipment - Secure well - Suck out cellar - Clear cellar area - Release rig @ 22:00 hrs Printed: 4/25/2005 10:03:06 AM ~ 3118"-5MFMC . Wellhead' 11" x 3.5" 5M G wI 3.5" TC-II T&B Tubing Hanger CIW "H" BPV profile MPK-22 20" x 34" insulated, 215 #/11 A-53 c:::DÐ 95/8" 40 ppf L-80 BTC 13535' I 7" 26# L-80 IBT-M casing ( drift ID = 6.151", cap = .0383 bpI) (cap = .0264 bpf wI 3 1/2" tbg inside) 3.5" 9.3# L-80 IBT-M tubing (drift ID = 2.867", cap = .0087 bpf) Baker Tie Back Sleeve Baker ZXP Liner Top Packer Baker 7" x 5" HMC Liner Hanger 7" Weatherford Float Collar 8004' 7" Weatherford Float Shoe 8090' DATE REV. BY COMMENTS 4/21/05 Lee Hulme Drilled and Completed - Doyon 14 ~~F elev. = 62.50' (Doyon 14) .-.L. elev.= 30.72' (Doyon 14) KOP @ 180' Hole angle passes 50 degrees @ 6250' Max angle in tubing = 75 degree 70 degrees at sliding sleeve 3.5" HES X-Nipple (2.813" Pkg ID) 13004' 1 3.5" HES 'XD' Dura Sliding Sleeve 2.813" ID (Opens down) 17742' 1 3.5" HES X-Nipple (2.813" Pkg ID) 17795' 1 7 x 3.5" Baker Premier Packer ( 2.875" ID ) 17844' I 3.5" HES XN-Nipple (2.813" Pkg ID, 2.75" No Go) 17899' 1 WLEG wI 4.75 No-Go aD 17949' 1 22 jts - 41/2", 12.6#/11 Solid & Slotted Liner 0' Rat hole 8tm HES 4 1/2" Float Shoe 8894' 6 1/8" Hole td @ 8894' (7135' tvd) MILNE POINT UNIT WELL MPK-22 API NO: 50-029-23249-00 BP EXPLORATION (AK) WE'-L SERVICE REPORT WELL MPK-22 DATE 5/8/2005 AFE MKD337432 JOB SCOPE RWO CAPITAL DAILY WORK FREEZE PROT KEY PERSON LRS-BRENNY JASON MINID 0" DEPTH OFT UNIT LRS 64 DAY SUPV HULME NIGHT SUPV UNKNOWN TTL SIZE 0" DAILY SUMMARY (Freeze Protect) T/1/0=10010/220 Freeze Protect after flowback to tank. Pumped 60 bbls meoh down ia and 20 bbls meoh down tbg. Final WH P=010/220 Init-> 100 0 220 TIME BPM BBLs FLUID TEMP TBG IA OA COMMENTS 09:00 start ticket, load meoh 10:25 miru, pt, pjsm, line up to pump down ia 10:44 1 sta rt meoh 30 100 0 220 start pumpina down ia 10:53 2 15 " " 500 220 11 :12 1.3 50 " " 1400 11 :16 shu 60 " " 1400 down shut down, rd, ru to tbg 11 :21 1 sta rt meoh 30 0 0 220 start pumping down tbg 11 :36 shu 20 " " 100 0 220 down shut down, rdmo 11 :59 end ticket Final-> 0 0 220 I FLUID SUMMARY 80 bbls meoh SERVICE COMPANY - SERVICE DAILY COST CUMUL TOTAL LITTLE RED $705 $705 WAREHOUSE $2,880 $2,880 SCHLUMBERGER $0 $2,900 PEAK $0 $5,500 ASRC $0 $2,200 TOTAL FIELD ESTIMATE: $3,585 $14,185 Legal Name: Common Name: MPK-22 MPK-22 4/12/2005 4/17/2005 FIT FIT 3,544.0 (ft) 7,086.0 (ft) 3,545.0 (ft) 8,090.0 (ft) 9.00 (ppg) 9.00 (ppg) 460 (psi) 560 (psi) 2,117 (psi) 3,873 (psi) 11.50 (ppg) 10.52 (ppg) Printed: 4/25/2005 10:03:01 AM Halliburton Sperry-Sun Milne Point Unit BPXA Milne Point MPK MPK-22 . Job No. AKZZ0003642743, Surveyed: 19 April, 2005 Survey Report 13 May, 2005 Your Ref: API 500292324900 Surface Coordinates: 6005796.90 N, 584569.33 E (70· 25' 32.7471" N, 149· 18' 39.0555" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 . Surface Coordinates relative to Project H Reference: 1005796.90 N, 84569.33 E (Grid) Surface Coordinates relative to Structure Reference: 5998786.50 N, 652593.45 E (True) Kelly Bushing Elevation: 62.45ft above Mean Sea Level Kelly Bushing Elevation: 62.45ft above Project V Reference Kelly Bushing Elevation: 62.45ft above Structure Reference .pllr"r"y....ul1 DRIL..L..I NG SERVI c: ES A· Hájiiburlon C omp;;;; Survey Ref: svy1521 Halliburton Sperry-Sun Survey Report for Milne Point MPK - MPK-22 Your Ref: API 500292324900 Job No. AKZZ0003642743, Surveyed: 19 April, 2005 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 0.00 0.000 0.000 -62.45 0.00 0.00 N O.OO·E 6005796.90 N 584569.33 E 0.00 CB-SS-GYRO 274.30 0.400 69.440 211.85 274.30 0.34 N 0.90 E 6005797.25 N 584570.22 E 0.146 -0.89 366.30 1.850 240.000 303.83 366.28 0.29 S 0.09W 6005796.61 N 584569.24 E 2.441 0.26 453.30 3.290 249.600 390.75 453.20 1.87 S 3.65W 6005794.99 N 584565.71 E 1.722 3.94 . 563.79 2.380 255.190 501.10 563.55 3.56 S 8.83W 6005793.24 N 584560.54 E 0.860 8.90 MWD+IIFR+MS+SAG 654.30 1.880 247.680 591.55 654.00 4.60 S 12.03 W 6005792.16 N 584557.36 E 0.632 11.96 750.41 1.090 261.540 687.62 750.07 5.34 S 14.39 W 6005791.40 N 584555.00 E 0.897 14.19 844.97 1.030 260.590 782.17 844.62 5.61 S 16.12W 6005791.11 N 584553.28 E 0.066 15.64 940.40 0.250 335.530 877.59 940.04 5.56 S 17.05 W 6005791.15 N 584552.35 E 1.042 16.30 1036.10 0.140 78.160 973.29 1035.74 5.34 S 17.02 W 6005791.36 N 584552.37 E 0.326 16.13 1132.07 0.220 63.500 1069.26 1131.71 5.24 S 16.74 W 6005791.47 N 584552.65 E 0.096 15.85 1228.80 0.560 66.600 1165.99 1228.44 4.97 S 16.14 W 6005791.75 N 584553.25 E 0.352 15.23 1324.36 0.680 94.020 1261.54 1323.99 4.82 S 15.15W 6005791.91 N 584554.24 E 0.331 14.40 1419.98 0.970 99.850 1357.15 1419.60 5.00 S 13.78 W 6005791.75 N 584555.60 E 0.315 13.52 1516.15 0.670 94.470 1453.31 1515.76 5.18 S 12.42 W 6005791.58 N 584556.97 E 0.322 12.64 1612.70 0.700 119.190 1549.86 1612.31 5.51 S 11.34 W 6005791.26 N 584558.05 E 0.305 12.07 1708.34 0.560 142.780 1645.49 1707.94 6.17 S 10.55 W 6005790.61 N 584558.85 E 0.305 11.94 1804.63 0.570 146.390 1741.78 1804.23 6.94 S 10.00 W 6005789.84 N 584559.41 E 0.038 12.06 1900.44 0.500 111.860 1837.58 1900.03 7.50 S 9.35W 6005789.30 N 584560.07 E 0.339 11.95 1996.60 0.560 128.230 1933.74 1996.19 7.94 S 8.59W 6005788.86 N 584560.83 E 0.169 11.70 2093.77 0.570 131.940 2030.90 2093.35 8.56 S 7.86W 6005788.25 N 584561.57 E 0.039 11.58 . 2189.69 0.310 109.950 2126.82 2189.27 8.97 S 7.26'/'1 6005787.85 N 584562.17 E 0.318 11 .42 2285.73 0.510 128.440 2222.86 2285.31 9.32 S 6.68·W 6005787.50 N 584562.76 E 0.247 11.23 2381.65 0.310 85.060 2318.78 2381.23 9.57 S 6.09W 6005787.27 N 584563.35 E 0.371 10.96 2478.28 0.450 329.820 2415.40 2477.85 9.21 S 6.02W 6005787.62 N 584563.42 E 0.669 10.67 2574.42 0.500 329.090 2511.54 2573.99 8.53 S 6.42W 6005788.30 N 584563.00 E 0.052 10.50 2671.07 0.500 336.780 2608.19 2670.64 7.78 S 6.81 IN 6005789.04 N 584562.61 E 0.069 10.28 2767.53 0.560 337.530 2704.64 2767.09 6.96 S 7.15W 6005789.86 N 584562.26 E 0.063 9.97 2861.14 0.550 335.530 2798.25 2860.70 6.13 S 7.51 W 6005790.69 N 584561.89 E 0.023 9.67 2955.46 0.670 335.110 2892.56 2955.01 5.21 S 7.93W 6005791.60 N 584561.46 E 0.127 9.36 3050.41 0.670 336.780 2987.51 3049.96 4.20 S 8.38W 6005792.61 N 584560.99 E 0.021 9.01 3146.84 0.260 31.700 3083.93 3146.38 3.49 S 8.49 W 6005793.31 N 584560.88 E 0.583 8.61 3242.91 0.480 34.640 3180.00 3242.45 2.98 S 8.15W 6005793.83 N 584561.22 E 0.230 8.01 3338.64 0.290 43.190 3275.73 3338.18 2.47 S 7.75W 6005794.34 N 584561.60 E 0.207 7.37 3435.60 0.450 24.680 3372.69 3435.14 1.95 S 7.43 W 6005794.87 N 584561.92 E 0.204 6.78 13 May, 2005 - 14:30 Page 2 of 5 Dri/lQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for Milne PC)int MPK - MPK-22 Your Ref: API 500292324900 Job No. AKZZ0003642743, Surveyed: 19 April, 2005 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastin9s . Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 3477.10 0.320 16.050 3414.19 3476.64 1.69 S 7.33W 6005795.13 N 584562.02 E 0.342 6.53 3622.95 0.060 325.780 3560.04 3622.49 1.23 S 7.26W 6005795.58 N 584562.09 E 0.196 6.17 3717.25 0.120 34.010 3654.34 3716.79 1.11 S 7.23W 6005795.71 N 584562.11 E 0.119 6.07 3813.19 0.060 302.590 3750.28 3812.73 1.00 S 7.22W 6005795.82 N 584562.13 E 0.141 5.98 3909.16 0.190 270.710 3846.25 3908.70 0.97 S 7.42 W 6005795.85 N 584561.92 E 0.149 6.11 . 4005.40 0.360 210.620 3942.48 4004.93 1.23 S 7.73W 6005795.58 N 584561.61 E 0.324 6.51 4100.91 0.380 216.130 4037.99 4100.44 1.74 S 8.07W 6005795.07 N 584561.28 E 0.043 7.11 4197.40 0.380 217.100 4134.48 4196.93 2.26 S 8.45 W 6005794.55 N 584560.90 E 0.007 7.74 4293.08 0.220 227.380 4230.16 4292.61 2.63 S 8.78W 6005794.17 N 584560.58 E 0.176 8.24 4387.90 0.200 206.370 4324.98 4387.43 2.91 S 8.99W 6005793.89 N 584560.38 E 0.083 8.57 4484.03 0.200 256.140 4421.11 4483.56 3.10 S 9.22W 6005793.70 N 584560.14 E 0.175 8.88 4580.01 0.060 242.480 4517.09 4579.54 3.16 S 9.43 W 6005793.63 N 584559.93 E 0.148 9.07 4675.98 0.140 263.170 4613.06 4675.51 3.20 S 9.59W 6005793.59 N 584559.77 E 0.090 9.22 4772.24 0.000 0.000 4709.32 4771.77 3.21 S 9.71 W 6005793.58 N 584559.66 E 0.145 9.31 4868.45 0.000 0.000 4805.53 4867.98 3.21 S 9.71 W 6005793.58 N 584559.66 E 0.000 9.31 4964.42 1.850 233.700 4901.48 4963.93 4.13 S 10.96 W 6005792.65 N 584558.42 E 1.928 10.85 5060.82 4.410 233.330 4997.73 5060.18 7.26 S 15.19W 6005789.47 N 584554.23 E 2.656 16.08 5157.38 7.170 234.600 5093.79 5156.24 12.97 S 23.08 W 6005783.67 N 584546.40 E 2.861 25.75 5252.87 9.800 232.020 5188.22 5250.67 21.43 S 34.34 W 6005775.09 N 584535.23 E 2.782 39.77 5347.54 12.640 232.600 5281.08 5343.53 32.68 S 48.92 W 6005763.67 N 584520.78 E 3.002 58.11 5442.93 17.060 234.280 5373.26 5435.71 47.19 S 68.59 W 6005748.93 N 584501.28 E 4.655 82.40 . 5539.45 21.450 231.500 5464.36 5526.81 66.46 S 93.90 W 6005729.38 N 584476.18 E 4.645 114.07 5635.48 25.270 232.430 5552.50 5614.95 89.89 S 123.90W 6005705.61 N 584446.45 E 3.996 152.01 5731.43 30.360 232.180 5637.34 5699.79 117.27 S 159.31W 6005677.84 N 584411.36 E 5.306 196.60 5826.27 34.520 233.450 5717.36 5779.81 147.98 S 199.85 W 6005646.66 N 584371.17 E 4.445 247.22 5922.32 37.260 231.180 5795.17 5857.62 182.42 S 244.38 W 6005611.72 N 584327.03 E 3.171 303.30 6017.65 40.300 232.500 5869.48 5931.93 219.29 S 291.33 W 6005574.32 N 584280.50 E 3.305 362.81 6113.30 44.790 233.500 5939.93 6002.38 258.18S 342.99 W 6005534.85 N 584229.29 E 4.747 427.14 6210.08 49.490 233.020 6005.74 6068.19 300.62 S 399.81 W 6005491.77 N 584172.95 E 4.870 497.68 6305.97 52.490 233.080 6066.09 6128.54 345.40 S 459.35 W 6005446.32 N 584113.92 E 3.129 571.80 6402.11 52.300 232.470 6124.76 6187.21 391.47 S 520.00 W 6005399.56 N 584053.80 E 0.540 647.61 6497.90 52.210 232.130 6183.40 6245.85 437.79 S 579.93 W 6005352.56 N 583994.40 E 0.296 723.07 6594.26 51.490 232.030 6242.92 6305.37 484.36 S 639.71 W 6005305.32 N 583935.15 E 0.752 798.58 6690.13 51.050 231.720 6302.90 6365.35 530.54 S 698.54 W 6005258.48 N 583876.84 E 0.524 873.13 6786.56 51.020 231.190 6363.54 6425.99 577.26 S 757.18 W 6005211.10 N 583818.74 E 0.428 947.91 13 May, 2005 - 14:30 Page 3 of 5 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for MilnePoint MPK - MPK-22 Your Ref: API 500292324900 Job No. AKZZ0003642743, Surveyed: 19 April, 2005 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 6882.83 50.790 230.520 6424.25 6486.70 624.42 S 815.13 W 6005163.28 N 583761.33 E 0.591 1022.47 6978.87 50.540 229.920 6485.13 6547.58 671.95 S 872.22 W 6005115.11 N 583704.79 E 0.549 1096.66 7075.47 50.200 229.090 6546.74 6609.19 720.26 S 928.79 W 6005066.16 N 583648.76 E 0.750 1171.00 7171.42 50.020 228.570 6608.28 6670.73 768.72 S 984.21 W 6005017.07 N 583593.89 E 0.456 1244.59 . 7267.78 50.050 228.270 6670.17 6732.62 817.74 S 1039.46 W 6004967.43 N 583539.21 E 0.241 1318.43 7363.94 50.050 228.360 6731.92 6794.37 866.76 S 1094.51 W 6004917.79 N 583484.71 E 0.072 1392.14 7459.88 51.740 228.950 6792.43 6854.88 915.94 S 1150.40 W 6004867.99 N 583429.38 E 1.825 1466.56 7555.81 56.740 231.330 6848.48 6910.93 965.77 S 1210.16W 6004817.48 N 583370.19 E 5.587 1544.27 7652.38 64.000 231.600 6896.19 6958.64 1018.02 S 1275.78 W 6004764.49 N 583305.16 E 7.522 1627.93 7746.02 70.690 231 .450 6932.24 6994.69 1071.76S 1343.40 W 6004709.99 N 583238.17 E 7.146 1714.06 7840.37 74.970 230.500 6960.08 7022.53 1128.51 S 1413.40 W 6004652.44 N 583168.80 E 4.637 1804.00 7935.12 75.270 230.730 6984.41 7046.86 1186.62S 1484.18W 6004593.54 N 583098.69 E 0.394 1895.42 8028.32 75.350 230.390 7008.05 7070.50 1243.89 S 1553.81 W 6004535.48 N 583029.72 E 0.363 1985.42 8072.69 75.280 229.340 7019.30 7081.75 1271.55S 1586.62 W 6004507.45 N 582997.22 E 2.295 2028.30 8118.47 79.010 228.270 7029.48 7091.93 1300.95 S 1620.20 W 6004477.67 N 582963.98 E 8.460 2072.91 8166.58 85.990 227.240 7035.76 7098.21 1333.00 S 1655.48 W 6004445.23 N 582929.06 E 14.663 2120.57 8200.00 88.200 227.520 7037.45 7099.90 1355.60 S 1680.04 W 6004422.35 N 582904.76 E 6.666 2153.95 8213.89 89.070 227.520 7037.78 7100.23 1364.97 S 1690.28 W 6004412.86 N 582894.63 E 6.263 2167.83 8261.85 86.670 228.070 7039.56 7102.01 1397.17 S 1725.78 W 6004380.26 N 582859.49 E 5.134 2215.75 8309.18 85.310 228.750 7042.87 7105.32 1428.51 S 1761.09W 6004348.53 N 582824.54 E 3.211 2262.96 8355.27 83.380 227.090 7047.42 7109.87 1459.24 S 1795.13 W 6004317.41 N 582790.85 E 5.512 2308.82 . 8404.92 83.070 222.710 7053.28 7115.73 1494.16 S 1829.92 yv 6004282.10 N 582756.46 E 8.782 2358.07 8455.11 83.920 221 .430 7058.96 7121.41 1531.17 S 1863.34W 6004244.71 N 582723.47 E 3.048 2407.72 8501.06 90.010 221.040 7061.39 7123.84 1565.66 S 1893.57 W 6004209.88 N 582693.63 E 13.281 2453.33 8549.84 91.760 220.820 7060.64 7123.09 1602.51 S 1925.52 W 6004172.67 N 582662.10 E 3.616 2501.81 8597.17 88.930 219.050 7060.36 7122.81 1638.80 S 1955.90 W 6004136.04 N 582632.13 E 7.052 2548.74 8646.00 85.600 215.800 7062.69 7125.14 1677.52 S 1985.53 W 6004096.99 N 582602.94 E 9.523 2596.78 8693.15 87.080 215.280 7065.70 7128.15 1715.81 S 2012.88 W 6004058.39 N 582576.02 E 3.326 2642.85 8742.38 88.920 215.360 7067.41 7129.86 1755.95 S 2041.32 W 6004017.93 N 582548.04 E 3.741 2690.98 8787.46 86.840 213.800 7069.08 7131.53 1793.04 S 2066.89 W 6003980.56 N 582522.89 E 5.766 2734.92 8827.07 88.280 215.250 7070.77 7133.22 1825.64 S 2089.32 W 6003947.70 N 582500.83 E 5.157 2773.52 ~ 8894.00 88.280 215.250 7072.78 7135.23 ø 1880.27 S 2127.93 W 6003892.63 N 582462.85 E 0.000 2838.95 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. 13 May, 2005 - 14:30 Page 4 of 5 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for Milne Point MPK - MPK-22 Your Ref: API 500292324900 Job No. AKZZ0003642743, Surveyed: 19 April, 2005 BPXA Milne Point Unit The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 227.280° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 8894.00ft., The Bottom Hole Displacement is 2839.63ft., in the Direction of 228.536° (True). Comments . Measured Depth (ft) 8894.00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 7135.23 1880.27 S 2127.93 W Projected Survey Survey too/prOgram for MPK-22 Fro m Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 563.79 0.00 563.55 563.79 8894.00 563.55 CB-SS-GYRO 7135.23 MWD+IIFR+MS+SAG . 13 May, 2005 - 14:30 Page 5 of 5 DrillQuest 3.03.06.008 STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report Submit to: Hm reQQ@¿admín.state.ak.us aCQcc prudhoe bav@adm~n.state.ak.us bob fieckenste;n@¿admín.state.ak.us Contractor: Doyon Rig No.: 14 DATE: 4/12/2005 Rig Rep.: Huntington/Gouchenauer Rig Phone: 670-3270 Rig Fax: 670-3269 Operator: BP Op. Phone: 670-3268 Op. Fax: 670-3269 Rep.: Vaughn / Willoughby Field/Unit & Well No.: MP K-22 Location: Section: 3 Operation: Drlg: XXXXXX Test: Initial: XXXXXX Test Pressure: Rams: 250/3500 1/28/04 Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Well Sign Dr!. Rig Hazard Sec. Size 13 5/8 3 1/2 x 6 2-7/8 x 5 Blind 31/8 31/8 31/8 MUD SYSTEM: Visual Test Trip Tank P Pit Level Indicators P Flow Indicator P Meth Gas Detector P H2S Gas Detector P Alarm Test P P P P P PTD # 205-022 Township: 12N Workover: Weekly: Annular: 250/2500 TEST DATA Test Result P P P Test Result P P P P P P P NA UM 11E Meridian: Range: Explor.: Other: Valves: 250/3500 FLOOR SAFETY VALVES: Quantity Test Result Upper Kelly 1 P Lower Kelly 1 P Ball Type 1 P Inside BOP 1 P CHOKE MANIFOLD: Quantity Test Result No. Valves 14 P Manual Chokes 1 P Hydraulic Chokes 1 P ACCUMULATOR SYSTEM: Time/Pressure Test Result System Pressure 3000 P Pressure After Closure 1700 P 200 psi Attained 39 sec P Full Pressure Attained 3 min 28 sec P Blind Switch Covers: All stations P Nitgn. Bottles (avg): 4 @ 2250 Test Results Number of Failures: Q Test Time: 4.5 Hours Components tested Repair or replacement of equipment will be made within days. Notify the North Slope Inspector 659-3607, follow with written confirmation to Superviser at: Hm rem:¡@¿admín.state.ak.us Remarks: MISC. INSPECTIONS: Test Result Location Gen.: P Housekeeping: P PTD On Location P Standing Order Posted P BOP STACK: Quantity 1 1 1 1 1 2 1 o BOP Test (for rigs) BFL 1/28/04 24 HOUR NOTICE GIVEN YES X NO Date Test start 04/11/05 0:00 Time Finish Waived By 6:00 AM Witness Scheve/Willoughby 4:30 BOP Doyon 14 4-12-05.xls Re: MPK-22 Change in Surface Casing Depth. e Subject: Re: MPK-22 Change in Surface Casing Depth From: Thomas Maunder <tom_maunder@admin.state.ak.us> Date: Mon, 04 Apr 2005 13:57:47 -0800 To: "Quay, Walter (Natchiq)" <QuayWD@BP.com> cc: Fred Johnson <JohnsoFC@BP.com> c7ûS -0 dd Thanks Walter. Setting shallower is prudent based on the MPK-09 experience. Does Schrader have hydrocarbon in this area of the field?? Likely not, otherwise it would be being developed. I will place a copy of this message in the well file. Good luck with the operations. Tom Maunder, PE AOGCC Quay, Walter (Natchiq) wrote: Tom, As per our telephone conversation last week, the upcoming well MPK-22 would like to change the planned surface casing depth from 4962' MD, (4962' TVD) to 3500' MD, (3500' TVD). This decision is based in part due to the severity of the hydrate issue seen in MPK-09. The casing/cementing program would change as follows: MPK-22 Old MPK-22 New Surface Csg 4962' MD 3500' MD Surface Lead Slurry 477 bbls, 626 sx of 10.7 ppg (4.28 ft/sx) 254 bbls, 447 sx of 11.5 ppg ASL(3.20 ft/sx) Surface Tail Slurry 42 bbls 204 sx of 15.8 ppg (1.16 ft/sx) 146 bbls, 327 sx of 12.5 ppg DeepCrete (2.51 ft/sx) Basis Tail cement to the Base of the PF. 40% Excess over Gauge Hole Lead Cement from Base PF to surface, 150% Excess over Gauge Hole Intermediate Csg. Intermediate Lead Intermediate Tail ppg (1.17 ft/sx) 7962' MD 7962' MD None 93 Bbls, 219 sx of 12.0 ppg (2.38 ft/sx) 34 bbls, 167 sx of 15.8 ppg (1.17 ft/sx) 34 bbls, 167 sx of 15.8 Basis Lead Cement 500' above the top of Schrader Bluff. 40% Excess over Gauge Hole Tail cement = 1000' MD above shoe. 40% Excess over Gauge Hole Walter Quay Quavwd@bp.com (907)564-4178 (907)440-8632 - Cell 1 of 1 4/4/2005 1 :58 PM @IT.i.W.ß\ìífE.. ~ Uif\JU lb . ¡'ñ\Un ¡ ~. þ .Æ.\ n Id u LriJ II . .00... W. : nV·.. 7..i /;.r¡¡.:.. '. \'. I ¡ I f\ \. " 'U\\ u '!-t ij' i\' ~ '0:!.).'uLrù FRANK H. MURKOWSKI, GOVERNOR "'IfASIiA OIL A5D GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Fred Johnson Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Milne Point MPK-22i BP Exploration (Alaska) Inc. Permit No: 205-022 Surface Location: 3661' NSL, 1987' WEL, SEe. 03, T12N, RIlE, UM Bottornhole Location: 1760' NSL, 4100' WEL, SEC. 03, T12N, RIlE, UM Dear Mr. Johnson: Enclosed is the approved application for permit to drill the above referenced service well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty~four (24) hours notice for a representative of the Commission to . ess any required test. Contact the Commission's petroleum field inspector at (907) 6 9-3 7 ger). S' ce e DATED thiS,J day of February, 2005 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. .... ... . 1 a. Type of work II Drill o Redrill rb. Current Well Class o Exploratory 0 Development Oil o Multiple,¡one ORe-Entry o Stratigraphic Test II Service 0 Development Gas o Single ZOl1e 2. Operator Name: 5. Bond: a Blanket o Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 2S1OO302630-277 MPK-22i 3. Address: 6. Proposed Depth: / 12. Field I Pool(s): P.O. Box 196612, Anchorage, Alaska 99519-6612 MD 8894' " TVD 7122' Milne Point Unit I Kuparuk River 4a. Location of Well (Governmental Section): 7. Property Designation: Sands Surface: / ADL375133 ., 3661' NSL, 1987' WEL, SEC. 03, T12N, R11E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2465' NSL, 3497' WEL, SEC. 03, T12N, R11 E, UM 03/16/05 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 1760' NSL, 4100' WEL, SEC. 03, T12N, R11 E, UM ./ 2560 '" 2075' " 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation 15. Distance to Nearest Well Within Pool Surface: x- 584569 ' y- 6005796 ¿ Zone- ASP4 (Height above GL): 62.5 feet 1670' away from MPK-37 / 16. Deviated Wells: Kickoff Depth: 300 feet" 17. Maximum Anticipated Pressures in psig (see 20 MC 25.035) Maximum Hole Angle: 88 deQrees Downhole: 2968 . Surface: 2278 , 18. li8$lng ....rogram: Specifications Setting Depth . Qu(~ntityOfCe~~nt Size TOD ... . Bottom c.f..orsacks Hole CasinQ WeiQht Grade CouplinQ Lenath MD TVD MD TVD (includinQ staae data) 42" 20· 92# H-40 Welded 115' Surface Surface 115' 115' 260 sx Arctic Set (ADDrox.) 12-1/4· 9-518· 40# L-80 BTC 4963' Surface Surface 4963' 4962' 626 sx AS Lite, 204 sx 'G' 8-314" 7" 26# L-80 BTC-M 7962' Surface Surface 7962' 7072' 167 sx Class 'G' 6-1/4· 4-1/2" 12.6# L-80 BTC 1032' 7862' 7043' 8894' 7122' Uncemented Slotted Liner 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill ANDRe-entry Op$rations) Total Depth MD (ft): Total Depth TVD (ft): I Plugs (measured): I Effective Depth MD (ft): IEffective Depth TVD (ft):1 Junk (measured): Casing LenQth Size Cement Volume MD TVD r i n I inp.r Perforation Depth MD (ft): IPerfOration Depth TVD (ft): 20. Attachments a Filing Fee, $100 o BOP Sketch a Drilling Program o Time vs Depth Plot o Shallow Hazard Analysis o Property Plat o Diverter Sketch o Seabed Report a Drilling Fluid Program a 20 MC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Walter Quay, 564-4178 Printed Name Fred Johnson Title Senior Drilling Engineer ,--(JAd /1 U~ Date.z/Ít/oS- Prepared By Name/Number: Signature Phone StY-SY2 7 Sondra Stewman, 564-4750 () Commission Use Only Permit To Drill ,zz! API Number: .3 t./ '" I Permit APprOV% ikl ~ee cover letter for Number: 2ôS- -0 50- Ot.!!l,.. J, 2- -- DC Date: :Þ 8rrí Ó other requirements Conditions of Approval: Samples Required D Yes ~o Mud Log Required DYes ~o ;~E suffide~easures jI$es 0 ~o D;rectlonaJ Survey Required ~es D No Other: 3Çá)·--· ~ ~ .~. \. \-\. \ \ ~ Q'i~~-\~~~\~()~' j;~i' \ Í' '<tOM,. '\ "" "'''~ I 1>-,. \ . \0 \So . Dala t-Izt/ð( JJ¡. ~~ ~ APPROVED BY ADD roved B"'I" ~ THE COMMISSION Form 1 0-401 R~d o.~ \ 'ubmitln Duplicate ., I STATE OF ALASKA ALASKA 0 L AND GAS CONSERVATION COMMI SION PERMIT TO DRILL 20 AAC 25 005 &/;);) ¡ . . bp I Well Name: I MPK-22 I Kuparuk Horizontal Injector Drilling and Completion Plan Summary I Type of Well: I Kuparuk C Sand Horizontal Injector Surface Location: 3,661' FSL and 1,987' FEL ,. (As Built) Section 3, T12N, R11 E UM E = 584,569' N = 6,005,796' .r TO - In Kuparuk D 2,781' FSL and 3,142' FEL Section 3, T12N, R11 E UM E = 583,425.97' N = 6,004,904.76' Z = 6,942.5' TVD T1 -- Top Kuparuk C1 2,465' FSL and 3,497' FEL Section 3, T12N, R11 E UM E = 583,075.00' N = 6,004,585.00 ' Z = 7,072.5 ' TVD T4 - Upper Mid C1 1,985' FSL and 3,938' FEL Section 3, T12N, R11E UM E = 582,640.00,' N = 6,004,100.00 ' Z = 7107.5' TVD T5 - BHL in Lower C1 1 ,760' FSL and 4,100' FEL / Section 3, T12N, R11 E UM E = 582,481.19' N = 6,003,873.28 Z = 7122.5' TVD Distance to Property line 2,075' Distance to nearest well 1,670' from MPK-37 AFE Number: I Estimated Start Date: 116 Mar 05 I Ri~: I Doyon 14 Ri days to complete: I 15 Page 1 . . ·10.1 before drilling the HRZ 6-1/8" Production Hole / Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to DS-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R. Casing/Tubing Program 42in 20 in* 92# H-40 Welded 115 0' 115' 1 115' 12.25 in 9.625 in 40# L-80 BTC 4963' 0 4963' 1 4962' 8.75 in 7.0 in 26# L-80 BTC-M 7962 0' 7962' 1 7072' 6.125 4.5 12.6 L-80 BTC 1032 7862'/7043' 889417122 Cement Program: Casin Size Basis 9-5/8",40#, L-80, BTC Surface Casin Tail cement = 500' MD above shoe. 40% Excess over Gauge Hole Lead to surface. 40% Excess over Gauge Hole to PF, 150% Excess over Gau e Hole from PF to Surface 10 bbl water 20 bbl CW 100 50 bbl of MudPush 477 bbl, 626 sx of ArcticSet Lite: 10.7 and 4.28 ft Isx 42 bbl, 204 sx "G" mixed at 15.8 Ibl al & 1.16 ft Isx Total Cement Volume: 519 bbl Wash S acer Lead Tail Casin Size Basis Total Cement Volume: 35 bbl 7",26#, L-80, BTC-M Intermediate Casin Tail cement = 1000' MD above shoe. 40% Excess over Gau e Hole Wash 5-bbl water 10 bbl CW 100 20 bbl of MudPush 35 bbl, 167sx "G" mixed at 15.8 Ibl al & 1.17 ft Isx BHST =170°F from SOR S acer Tail Tern Page 2 . . Evaluation Program: 12-1/4" Section Open Hole: · Surface Readout Gyro · MWD/GR ./ · IFR/CASANDRA, · Sperry InSite 8-3/4" Section · MWD/GR/RES ,r · I FR/CASANDRA, · Sperry InSite Cased Hole: · GR/SCMT in PDC mode 6-1/8" Section Open Hole: · MWD/GR/RES/RES (ABI) ,r' · IFR/CASANDRA, · Sperry InSite Cased Hole: Formation Markers: Formation Tops MD TVD Pore Pressure EMW (ft) (ft) (psi) (lb/gal) BPRF 1698 1698 710 8.35 Top Uanu (TUZC) 4172 4173 1785 8.35 Top Schrader Na 4527 4528 1939 8.35 Schrader Bluff Oa 4652 4653 1993 8.35 Base Schrader Ob 4737 4738 2030 8.35 Top HRZ 6865 6483 2788 8.35 Top KalubiklBase HRZ(may be faulted out) 7100 6633 2853 8.35 Top Kuparuk D (hiahest RES readina) 7520 6898 2968 8.35 Top Kuparuk C1 7944 7068 2467 7.80 TD 8894 7122 2524 7.80 ,.. ./ Recommended Bit Program: 1 2 3 12.25" 8.75" 6.125" o - 4963 4963' - 7962' 7962' - 8894' 4963' Baker Hughes MX-1 2999' 932' Hycalog DSX-111 Page 3 . . Well Control: Intermediate/Production hole: · Maximum anticipated BHP: · Maximum surface pressure: · Planned BOP test pressure: · Integrity tests: Kick tolerance: · Integrity tests: · Planned completion fluid: 2,968 psi at 6,897' TVD (Top of the Kuparuk D) ... 2,278 psi at (Based on a full column of gas at 0.1 psi/ft) , 3,500 psi .../ FIT to 11.5 Ib/gal 20' below the 9-5/8" shoe. 67 Bbls with 10.0 Ib/gal mud at below the 9-5/8" shoe. FIT to 10.5 Ib/gal 20' below the 7" shoe. Kill Weight Brine with diesel cap. Drilling Hazards & Contingencies: · Large (1" to 2") Gravel has been encounterd in some K-Pad wells. High Vis Mud should be utilized. · Hydrates have been reported on K-Pad. Expected Depth for hydrates 2200' SS to 2900' SS. " Keep the Mud as Cool as possible. · Tight hole and stuck pipe due to clays and poor hole cleaning have occurred on K Pad wells. Lost Circulation Lost Circulation has been encountered in both the surface and production intervals. · The surface interval incidents appear to result from higher MW (>1 0.5ppg) utilized for hydrate issues. The higher MW did not effectively combat the hydrates and was eventually lowered to TD and run casing. · The lost circulation in the production intervals is associated with conductive faults. We do not expect losses while drilling this well if there is good hole cleaning. If seepage and/or losses occur, follow the LOST CIRCULATION DECISION MATRIX in the well plan. Expected Pressures / · All Formation are expected to be normally pressured: 8.35 ppg or less 7.8 ppg in the Kuparuk. , Pad Data Sheet · Please Read the K-Pad Data Sheet thoroughly. Hydrocarbons · Hydrocarbons are possible in the Schrader Bluff interval. / Faults · Two (2) faults are mapped in the well. Fault #1 in the surface hole section at 4437' MD(4438' TVD) in the lower Ugnu. Fault #2 is within the Kalubik shale @ 7179' MD (6683' TVD). Neither fault are expected to cause issues,. Ensure safe distance from the upper fault when setting surface casing. Hydrogen Sulfide · MPK Pad is not designated as an H2S Pad, H2S detected from Kuparuk wells on the pad: MPK-06 20.9 ppm 3/2001 / MPK-38 20.5 ppg 3/2001 Page 4 . . Anti-collision Issues · MPK-22 passes the Major Risk Criteria. However, magnetic interference is expected down ot as deep as 1700'. Therefore, a surface readout Gyro surveys will be required until clear of magnetic interference. Distance to Nearest Property · MPK-22 is planned to be 2075 ft from the nearest Milne Point property line. ,/ Distance to Nearest Well Within Pool · MPK-22 is 1670 ft from the nearest sand penetration in the MPK-37. ,/ Page 5 . . DRILL & COMPLETION PROCEDURE Pre-Ria Operations 1 . The 20" conductor will be installed pre-rig. Drillina: 1. MIRT and NU Diverter. 2. Function Test Diverter, PU 4" DP and BHA. 3. Drill 12-1/4" surface hole below the Schrader Bluff interval. 4. Run and cement 9-5/8" sruface casing. 5. ND diverter, install wellhead and NU/Test BOPE. 6. Drill 8-3/4" hole to intermediate casing point. 7. Run and cement 7" intermediate casing. 8. Drill 6-1/8" Horizontal Interval. 9. Run and set 4-1/2" Slotted Liner. ' 1 O. Displace to Kill Wt Brine. 11. RU & run GR/SCMT 12. Run a 3-1/2" ESP Completion 13. ND BOP/NU Tree. 14. Freeze Protect With Diesel 15. RD & MO Doyon 14. Page 6 TREE: 3-1/2" 5M WELLHEAD: FMC Gen 5 11" 5M TUBING HEAD: 11" 20",92 ppf H-40 Welded I xxxXI 9.625", 40 ppf BTC L-80 ~ 3-1/2" 9.2 ppf, L-80, production tubing Directional KOP 300' MD Max 7" well bore angle: 74° @ 7872' MD 7" 26 ppf, L-80, Btc-mod production casing I 7962' I MP 2i Proposed 27 Jan 05 WDQ Proposed Kuparuk Horizontallnjextor DF ELEVA 62.5 Ft 3-1/2" X-Nipple I XXXX' I 3-1/2" Sliding Sleeve I XXXX' I 3-1/2" X-Nipple I XXXX' I I XXXX' I I XXXX' I 7" X 3-1/2" Baker Packer 3-1/2" X Nipple 3-1/2" XN Nipple WLEG 18894' / 4-1/2" 12.6# L80 Slotted Liner flIL~E POINT UNIT API NO: XX-XXX-XXXXX-XX L2 API NO: XX-XXX-XXXXX-XX L 1 API NO: XX-XXX-XXXXX-XX BP EXPLORATION (AK) K-PAD i ~r \ ~ ~~------ Z1 o ¡r~ f't ~ Q .. éf -~- I 28 VICINITY MAP N.T.S. NOTE S 1 0 · 2 1. DATE OF SURVEY: JANUARY 14, 1997. 3 0 0 4 2. REFERENCE FIELD BOOK: MP97-01 (09-12). 5 · · 6 3. ALASKA STATE PLANE COORDINATES ARE 7 0 0 8 ZONE 4, ALASKA, NAD 27. 9 · · 10 4. MPU K-PAD SCALE FACTOR IS: 0.99990812. 11 0 1-12 5. HORIZONTAL CONTROL BASED ON K PAD 13 · K-14 MONUMENTS K-1 NORTH AND K-2 SOUTH. 15 0 16 6. ELEVATIONS ARE BP MPU DATUM (M.S.L.). 17 · · 18 7. VERTICAL CONTROL IS BASED ON BRAIDEN 19 0 1-20 CAP AT WELL C-1, ELEVATION = 16.86', 21 · K-22 ESTABLISHED BY BOMHOFF & ASSOCIATES. 23 0 24 25 · 0 26 27 0 0 28 29 0 · 30 31 0 0 32 .33 · · 34 35 0 0 36 37 . · 38 39 0 0 40 41 0 0 42 43 0 0 44 ---------- SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERL Y REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF JANUARY 14. 1997. LOCA TED WITHIN PROTRACTED SEC. 3. T. 12 N.. R. 11 E., UMIAT MERIDIAN, AK. WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NO. COORDINA TES COORDINA TES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS Y=6,005,852.27 N. 9,909.77 70'25'33.294" 70.4259150' 28.4' 3,716' FSL -14 X.. 584546.48 E. 5109.86 11-918'39.707" 149.3110297' 2009' FEL / -22 Y=6,005,796.90 N. 9,849.87 70'25'32.747" 70.4257631' 28.2' 3,661' FSL X= 584569.33 E. 5109.90 14918'39.055" 149.31084P6· 1,987' FEL LEGEND ... AS-BUILT WELL CONDUCTOR . EXISTING WELL CONDUCTOR o FUTURE PROPOSED WELL F ROb'l AWN: JACOBS . lllli. CHECKm O'HANLEY BP EXPLORATION DAlE: 1/15 7 DRAWING- SHEET- IotPUKAB MILNE POINT UNIT 1 !rn5~œo JOB ..¡,): 5,fALF: AS-BUlL T WELL CONDUCTORS 1 OF 1 0 FOR __110M JJ LOH ~MDUIfC)~ WELLS K-14 AND K-22 "1 CSf ,._ LoW ,.. 100' 1[ IIE'iISlON OIl< -. ..- -- -22i lanne K-21APB1 0.25 Mile Buffer (Kuparuk o ø Abandoned Gas Injector Or Gas Producer Shut-In Miscible Miscible -$- Not Yet Null/Ul'lllmowl"I Oil Producer .. Oii Producer Gas lift Oil Producer Oil Producer Shut·ln Oil Producer Submersible Oil tit Oil 800 1600 flowing Back for Redrili ¢- Water Water Water tit Water COMPANY DETAJLS REFERENCE iNFORMATION SUR' lEY PROORAM Plan: MP.K~22 WPlO {Plan MPK-21/Platl MPK~22} BP A.mocö ~Ë~¡~ Depth Fro Depth To Survey!P1an Tool Created By: Digital Business Client User Date: 2/9/2005 34.30 CB-GYRO-SS Clwdred, Date: Enm S,,,,= ISCWSA 6¡Sû 1900,00 MWD+IFR+MS - ¡¡n¡;;¡,;,;:¡¡;;: Reviewed: Date: WELL DETAILS N""", +Ní-S +F)·W N_ ...... LWtud, LOI1gitw:ie SI", III II Man MPK>22 ¡ 1042,0:2 W9i.62 60057%.90 58456933 70"25'3~t747N 149"lS'39,055W NlA O¡j SECTION DETAILS 5/0 See !lID Inc Azi TVD +NI-S +EI-W DLeg TFac. VSec Target I O. 2 23 t~ 3 íiJõi 4 12 5 23 6 -, 7 :: -I MPK-22 TO Upper !Cup D 8 9 MP!C-22 TI top CI II"µ' 10 ~ :: 1 ·1 ~~i~: I! 12 :¡i -HJ¡ MPK-22 T4 UPP<'f Mid CI ~I !3 ~ 14 -i, 2839. MPK-22 T5 Lower CI 240 TARGET DETAILS Nanw TVD +NI-S +EI-W Northing Basting Shape , Uwer Kup D ... -- . ;~;;.;~ , r; § 360" 0 '" i, CASING DETAILS 0 ïJ No. TVD !lID Name Size .~ I > 1! 2 ¡... 480" , 3 112" I .,/ ............................................... ~I //:... ............. . .... 60 /' .... II .. I. ..' ~ '.... .. '! ". '~ , I ~ '/ [/ 720 i/J~!' I ................~ 0 1200 2400 3600 4800 Vertical Sèction at 227.28" [l200fl/inj COMPAl'.'Y DETAILS REFERENCE INFORMATION SURVEY PROGRAM PiAn, MPK·22 WPW (Plan MPK·22JP¡an MPK'22) BP Amoco C~~~5 ,'~"m"' ¿ Deptl1 Fm rkpIh To SUI'\'e)'1Plan T",,' Creared By: Digítal Business Clîent User Dare: 2f9/200'5 ~OO ã~:~ PI!U1I1ed; MPK~22 WPlO VHì8 f,~;¡"'~< Checked: Date: 625" P1anned; MPK~22 WPH} VI WELL DETAILS MmW +N!~ +Ef"W Northing """" w_ L_ "01 . PlanMPK"22 11042.62 1097.62 6OÐ5'ì'965M1 584569.33 7O~m2.i41N 149"18'39JJS5W N/A , , " ¡; ~ I FORMATION TOP DETAILS -4"" No. TVDPatb MDPat!¡ Formation 1 ;/i 1 ¡ ¡PRF .{. 2 + 3 I 4 ,.k . "In"'''_ J I : 5 ~¿' HI) 6 npf ::z t7"'¡'/ 7 fa ; i; ; I 8 ·n ·8w 9 i i '" 1'¡ \ i{ ;§ , g i "I ~ J ::!:. \ +' ie' ':E: I~:I\ 1),/ ~ CASlNG DETAILS ~ ~ ~; i i Nn. TVD MD Name Size ! , I ':E: -[2 ; I ] 'I ti 1 IJ I 1 j' ~j j 1 ì 2 :> 1/ i 3 4 lI2" : i ,i~1 ~ 7t:... .<' TARGET DETAILS ~F-< ¡"c' Name TVD +NI-S +E!-W Northing Easting Shape II 1;/ tJ ¡I iEid );, : BI1J9 -I ¡~~:: ~ I I;c' 17 ; I - :: , ·[6 t/ ! I 1\ :: ì~~oo /1 ¡,~ I \ :: :~ l:: ¡ ) ; I 1\ 7) Ii i7/ SECTION DETAILS V? ¡// t' Soo MD !nc Azi TVD +NI-S +E!-W DLeg TFace VSec Target ,~ I I I 1 -200v " ; ¡ 1 2 ~ 23; i~' k! 3 l' 4 i~~~: 5 23 6 :: 7 -I MPK-22 TO Upper Kill' D 8 9 :: MPK-22 Ti 1£11' Cl 1 10 1: -1 11 d 12 -HJ MPK-22 T4 Upper Mid Cl -24"" 13 :ì -2400 -2000 -1600 -1200 -800 14 MPK-22 T5 Lower Cl W. . . Sperry-SuD BP Planning Report Company: Field: Site: Well:; WeDpath: Plan: BP Amoco Milne Point M PtKPad Plan MPK-22 Plan MPK-22 MPK-22 WP10 Date: 21912005 Time: 15:42:24 Page: Co-ordinate(NE) Reference: Well: Plan MPK-22, True North Vertieal (TVD) Reference: 34.3+28.262.5 . Section (VS) Reference: Well (O.OON,O.00E,227.28Azi) Survey Calculation Method: Minimum Curvature . Db: Oracle Principal: Yes Date Composed: Version: Tied-to: 3/212004 108 From Well Ref. Point Field: Milne Point North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre bggm2004 Site: M Pt K Pad TR-12-11 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 27.90 ft 5994744.31 ft 583595.36 ft Latitude: Longitude: North Reference: Grid Convergence: 70 23 44.152 N 149 19 11.252W True 0.64 deg WeD: Plan MPK-22 Slot Name: WeD Position: +N/-S 11042.02 ft Northing: 6005796.90 ft Latitude: 70 25 32.747 N +EI-W 1097.62 ft Easting : 584569.33 ft Longitude: 149 18 39.055 W Position Uncertainty: 0.00 ft Casing Points TVD Diameter Hole Size Name ft in in 4962.50 9.625 12.250 9 518" 7072.50 7.000 8.500 7" 7122.47 4.500 6.125 4 112" Formations MD .TVD FomÌations Uthology . Dip Angle Dip Direttion ft ft deg deg 1697.77 1697.50 BPRF 0.00 0.00 4172.77 4172.50 Top Ugnu (TUZC) 0.00 0.00 4527.77 4527.50 Top Schrader Na 0.00 0.00 4652.77 4652.50 Schrader Bluff Oa 0.00 0.00 4737.77 4737.50 base Schrader Ob 0.00 0.00 6865.03 6482.50 top HRZ 0.00 0.00 7100.38 6632.50 Top Kalubik/Base HRZ(may be fa 0.00 0.00 7520.88 6897.50 Top Kuparuk D 0.00 0.00 7944.34 7067.50 Top Kuparuk C1 0.00 0.00 Targets Map Map <-- Latitude --> Name Destription TVD +N/-S +EI-W Northing Easting Deg Min Set Dip. Dir. ft ft ft ft ft MPK-22 Fault 1 4437.50 -153.00 -346.12 6005640.00 584225.00 70 25 31.242 N 149 18 49.208 W -Polygon 1 4437.50 -153.00 -346.12 6005640.00 584225.00 70 25 31.242 N 149 18 49.208 W -Polygon 2 4437.50 -692.68 -382.24 6005100.00 584195.00 70 25 25.935 N 149 18 50.267 W -Polygon 3 4437.50 -943.32 -770.14 6004845.00 583810.00 70 25 23.469 N 149 19 1.643 W -Polygon 4 4437.50 -692.68 -382.24 6005100.00 584195.00 70 25 25.935 N 149 18 50.267 W -Plan out by 363.37 at 4437.50 -10.09 -12.03 6005786.67 584557.42 70 25 32.648 N 149 18 39.408 W MPK-22 Fault 2 6682.50 -1313.49 -319.26 6004480.00 584265.00 70 25 19.829 N 149 18 48.419 W -Polygon 1 6682.50 -1313.49 -319.26 6004480.00 584265.00 70 25 19.829 N 149 18 48.419 W -Polygon 2 6682.50 -1569.25 -697.22 6004220.00 583890.00 70 25 17.314 N 149 18 59.502 W -Polygon 3 6682.50 -2112.94 -378.33 6003680.00 584215.00 70 25 11.967 N 149 18 50.150 W -Polygon 4 6682.50 -1569.25 -697.22 6004220.00 583890.00 70 25 17.314 N 149 18 59.502 W -Plan out by 875.77 at 6682.50 -762.02 -999.59 6005023.67 583578.53 70 25 25.252 N 149 19 8.373 W MPK-22 TO Upper Kup D 6842.50 -879.20 -1153.50 6004904.76 583425.97 70 25 24.099 N 149 19 12.887 W -Plan hit target MPK-22 T1 top C1 7072.50 -1195.00 -1508.11 6004585.00 583075.00 70 25 20.993 N 149 19 23.285 W -Plan hit target . . Sperry-SuD BP Planning Report Company: Date: 2!9J2005 Time: 15:42:24 Page: Field: Co-ordinate(NE) Reference: Well: Plan MPK-22. True North Site: Vertical (TVD) Reference: 34.3+28.2 62.5 WeB: Seetion (VS) Reference: Well (O.ooN.O.ooE,227.28Az1) WelJpath: Survey CaIeulation Method: Minimum Curvature Db: Map Map <-- Latitnde --> <- Longltnde -> TVD +N/-S +EI-W Northing Easting Deg MiD See Deg Min . See ft ft ft ft ft MPK-22 poly 7082.50 -1069.06 -971.59 6004717.00 583610.00 70 25 22.232 N 149 19 7.551 W -Polygon 1 7082.50 -1069.06 -971.59 6004717.00 583610.00 70 25 22.232 N 149 19 7.551 W -Polygon 2 7082.50 -860.12 -1228.27 6004923.00 583351.00 70 25 24.287 N 149 19 15.080 W -Polygon 3 7082.50 -1076.41 -1646.78 6004702.00 582935.00 70 25 22.159 N 149 19 27.353 W -Polygon 4 7082.50 -1782.59 -2169.87 6003990.00 582420.00 70 25 15.213 N 149 19 42.688 W -Polygon 5 7082.50 -1946.60 -2259.74 6003825.00 582332.00 70 25 13.599 N 149 19 45.323 W -Polygon 6 7082.50 -1959.70 -1985.85 6003815.00 582606.00 70 25 13.471 N 149 19 37.290 W -Polygon 7 7082.50 -1485.23 -1491.39 6004295.00 583095.00 70 25 18.139 N 149 19 22.793 W -Plan out by 582.20 at 7082.50 -1220.15 -1533.85 6004559.56 583049.55 70 25 20.746 N 149 19 24.040 W MPK-22 T4 Upper Mid C1 7107.50 -1675.08 -1948.61 6004100.00 582640.00 70 25 16.270 N 149 19 36.201 W MPK-22 T5 Lower C1 7122.50 -1900.00 -2110.00 6003873.28 582481.19 70 25 14.058 N 149 19 40.932 W Plan Seetion Information MD Ine! AzIm TVD +N/-S +EI-W DLS Bnild Turn· TFO Target ft deg deg ft ft ft deg/100ft deg/10Oft degl100ft deg 34.30 0.00 0.00 34.30 0.00 0.00 0.00 0.00 0.00 0.00 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 600.00 3.00 230.00 599.86 -5.05 -6.02 1.00 1.00 0.00 230.00 900.00 0.00 0.00 899.73 -10.09 -12.03 1.00 -1.00 43.33 180.00 4982.00 0.00 0.00 4981.73 -10.09 -12.03 0.00 0.00 0.00 0.00 6242.12 50.40 232.71 6085.48 -324.77 -425.31 4.00 4.00 -10.10 232.71 7429.86 50.40 232.71 6842.50 -879.20 -1153.50 0.00 0.00 0.00 0.00 MPK-22 TO Upper Kup D 7872.74 74.00 225.79 7047.77 -1134.85 -1446.27 5.50 5.33 -1.56 -16.31 7962.48 74.00 225.79 7072.50 -1195.00 -1508.11 0.00 0.00 0.00 0.00 MPK-22 T1 top C1 7982.48 74.00 225.79 7078.01 -1208.40 -1521.89 0.00 0.00 0.00 0.00 8109.59 88.81 222.08 7096.96 -1298.70 -1608.78 12.00 11.65 -2.92 -14.25 8616.80 88.81 222.08 7107.50 -1675.08 -1948.61 0.00 0.00 0.00 0.00 MPK-22 T4 Upper Mid C1 8771.34 86.17 213.18 7114.28 -1797.21 -2042.78 6.00 -1.71 -5.76 -106.69 8894.43 86.17 213.18 7122.50 -1900.00 -2110.00 0.00 0.00 0.00 0.00 MPK-22 T5 Lower C1 Survey MD Sys TVD N/S EIW DLS MapN Map! ft ft ft ft . deg/100ft ft ft 34.30 -28.20 0.00 0.00 0.00 6005796.90 584569.33 CB-GYRO-SS 100.00 37.50 0.00 0.00 0.00 6005796.90 584569.33 CB-GYRO-SS 200.00 137.50 0.00 0.00 0.00 6005796.90 584569.33 CB-GYRO-SS 300.00 237.50 0.00 0.00 0.00 6005796.90 584569.33 Start Dir 111 00 / 400.00 337.49 -0.56 -0.67 1.00 6005796.33 584568.67 CB-GYRO-SS 500.00 2.00 230.00 499.96 437.46 -2.24 -2.67 1.00 6005794.63 584566.68 CB-GYRO-SS 600.00 3.00 230.00 599.86 537.36 -5.05 -6.02 1.00 6005791.79 584563.37 CB-GYRo-SS 700.00 2.00 230.00 699.77 637.27 -7.85 -9.36 1.00 6005788.94 584560.06 CB-GYRO-SS 800.00 1.00 230.00 799.73 737.23 -9.53 -11.36 1.00 6005787.24 584558.08 CB-GYRO-SS 900.00 0.00 0.00 899.73 837.23 -10.09 -12.03 1.00 6005786.67 584557.42 End Dir : 900' 1000.00 0.00 0.00 999.73 937.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRO-SS 1100.00 0.00 0.00 1099.73 1037.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRO-SS 1200.00 0.00 0.00 1199.73 1137.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRO-SS 1300.00 0.00 0.00 1299.73 1237.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRO-SS 1400.00 0.00 0.00 1399.73 1337.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRO-SS 1500.00 0.00 0.00 1499.73 1437.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRo-SS 1600.00 0.00 0.00 1599.73 1537.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRO-SS 1697.77 0.00 0.00 1697.50 1635.00 -10.09 -12.03 0.00 6005786.67 584557.42 BPRF 1700.00 0.00 0.00 1699.73 1637.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRO-SS 1800.00 0.00 0.00 1799.73 1737.23 -10.09 -12.03 0.00 6005786.67 584557.42 CB-GYRO-SS 1900.00 0.00 0.00 1899.73 1837.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 2000.00 0.00 0.00 1999.73 1937.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS . . Sperry-SUD BP Planning Report <'::òlD~Y: BP Aniocò .. Date: 219/2005 \Einîe: 15:42:24 Field: Milne POint . C..r~t~E)Rerennœ: Site: MPtKead .. VertiCal (TVD)Refe~: WeB: PlänMBK-22 SeÇtiQn (VS) Refennœ.: . WeJ4Iath: PlänMBK-22 Su~ CalculatiOn MethOd: . Survey MD Incl A.ibn 'ß'D Sys 'ß'D NIS EIW ft dêg dêg ft ft ft ft 2100.00 0.00 0.00 2099.73 2037.23 -10.09 -12.03 MWD+IFR+MS 2200.00 0.00 0.00 2199.73 2137.23 -10.09 -12.03 MWD+IFR+MS 2300.00 0.00 0.00 2299.73 2237.23 -10.09 -12.03 MWD+IFR+MS 2400.00 0.00 0.00 2399.73 2337.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 2500.00 0.00 0.00 2499.73 2437.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 2600.00 0.00 0.00 2599.73 2537.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 2700.00 0.00 0.00 2699.73 2637.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 2800.00 0.00 0.00 2799.73 2737.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 2900.00 0.00 0.00 2899.73 2837.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 3000.00 0.00 0.00 2999.73 2937.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 3100.00 0.00 0.00 3099.73 3037.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 3200.00 0.00 0.00 3199.73 3137.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 3300.00 0.00 0.00 3299.73 3237.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 3400.00 0.00 0.00 3399.73 3337.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 3500.00 0.00 0.00 3499.73 3437.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 3600.00 0.00 0.00 3599.73 3537.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 3700.00 0.00 0.00 3699.73 3637.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 3800.00 0.00 0.00 3799.73 3737.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 3900.00 0.00 0.00 3899.73 3837.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 4000.00 0.00 0.00 3999.73 3937.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 4100.00 0.00 0.00 4099.73 4037.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 4172.77 0.00 0.00 4172.50 4110.00 -10.09 -12.03 0.00 6005786.67 584557.42 Top Ugnu (TUZ 4200.00 0.00 0.00 4199.73 4137.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 4300.00 0.00 0.00 4299.73 4237.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 4400.00 0.00 0.00 4399.73 4337.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 4437.77 0.00 0.00 4437.60 4375.00 -10.09 -12.03 0.00 6005786.67 584557.42 MPK-22 Fault 1 4500.00 0.00 0.00 4499.73 4437.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 4527.77 0.00 0.00 4527.50 4465.00 -10.09 -12.03 0.00 6005786.67 584557.42 Top Schrader N 4600.00 0.00 0.00 4599.73 4537.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 4652.77 0.00 0.00 4652.50 4590.00 -10.09 -12.03 0.00 6005786.67 584557.42 Schrader Bluff 4700.00 0.00 0.00 4699.73 4637.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 4737.77 0.00 0.00 4737.50 4675.00 -10.09 -12.03 0.00 6005786.67 584557.42 base Schrader 4800.00 0.00 0.00 4799.73 4737.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 4900.00 0.00 0.00 4899.73 4837.23 -10.09 -12.03 0.00 6005786.67 584557.42 MWD+IFR+MS 4962.77 0.00 0.00 4962.50 4900.00 -10.09 -12.03 0.00 6005786.67 584557.42 9 5/8" 4982.00 0.00 0.00 4981.73 4919.23 -10.09 -12.03 0.00 6005786.67 584557.42 Start Dir 4/100 5000.00 0.72 232.71 4999.73 4937.23 -10.16 -12.12 4.00 6005786.60 584557.33 MWD+IFR+MS 5100.00 4.72 232.71 5099.59 5037.09 -13.04 -15.90 4.00 6005783.68 584553.59 MWD+IFR+MS 5200.00 8.72 232.71 5198.89 5136.39 -20.12 -25.20 4.00 6005776.49 584544.36 MWD+IFR+MS 5300.00 12.72 232.71 5297.12 5234.62 -31.39 -40.00 4.00 6005765.06 584529.69 MWD+IFR+MS 5400.00 16.72 232.71 5393.82 5331.32 -46.78 -60.21 4.00 6005749.45 584509.66 MWD+IFR+MS 5500.00 20.72 232.71 5488.51 5426.01 -66.22 -85.74 4.00 6005729.72 584484.35 MWD+IFR+MS 5600.00 24.72 232.71 5580.73 5518.23 -89.61 -116.47 4.00 6005705.98 584453.90 MWD+IFR+MS 5700.00 28.72 232.71 5670.03 5607.53 -116.84 -152.23 4.00 6005678.35 584418.45 MWD+IFR+MS 5800.00 32.72 232.71 5755.98 5693.48 -147.78 -192.87 4.00 6005646.95 584378.17 MWD+IFR+MS 5900.00 36.72 232.71 5838.16 5775.66 -182.28 -238.17 4.00 6005611.95 584333.26 MWD+IFR+MS 6000.00 40.72 232.71 5916.17 5853.67 -220.16 -287.93 4.00 6005573.51 584283.94 MWD+IFR+MS 6100.00 44.72 232.71 5989.62 5927.12 -261.25 -341.90 4.00 6005531.81 584230.45 MWD+IFR+MS 6200.00 48.72 232.71 6058.16 5995.66 -305.35 -399.81 4.00 6005487.07 584173.04 MWD+IFR+MS 6242.12 50.40 232.71 6085.48 6022.98 -324.77 -425.31 4.00 6005467.37 584147.76 End Dir : 6242 6300.00 50.40 232.71 6122.37 6059.87 -351.79 -460.80 0.00 6005439.95 584112.59 MWD+IFR+MS 6400.00 50.40 232.71 6186.11 6123.61 -398.46 -522.11 0.00 6005392.58 584051.82 MWD+IFR+MS 6500.00 50.40 232.71 6249.84 6187.34 -445.14 -583.42 0.00 6005345.21 583991.05 MWD+IFR+MS . Sperry-Sun BP Planning Report . 6600.00 50.40 232.71 6313.58 6251.08 -491.82 -644.72 0.00 6005297.85 583930.28 MWD+IFR+MS 6700.00 50.40 232.71 6377.32 6314.82 -538.50 -706.03 0.00 6005250.48 583869.51 MWD+IFR+MS 6800.00 50.40 232.71 6441.05 6378.55 -585.18 -767.34 0.00 6005203.11 583808.74 MWD+IFR+MS 6865.03 50.40 232.71 6482.50 6420.00 -615.54 -807.21 0.00 6005172.31 583769.22 top HRZ 6900.00 50.40 232.71 6504.79 6442.29 -631.86 -828.65 0.00 6005155.74 583747.97 MWD+IFR+MS 7000.00 50.40 232.71 6568.52 6506.02 -678.54 -889.96 0.00 6005108.38 583687.20 MWD+IFR+MS 7100.00 50.40 232.71 6632.26 6569.76 -725.22 -951.27 0.00 6005061.01 583626.43 MWD+IFR+MS 7100.38 50.40 232.71 6632.50 6570.00 -725.40 -951.50 0.00 6005060.83 583626.20 Top KalubiklBa 7178.83 50.40 232.71 e682.50 6620.00 -762.02 -999.59 0.00 6005023.67 583578.53 MPK-22 Fault 2 7200.00 50.40 232.71 6696.00 6633.50 -771.90 -1012.57 0.00 6005013.64 583565.66 MWD+IFR+MS 7300.00 50.40 232.71 6759.73 6697.23 -818.58 -1073.88 0.00 6004966.28 583504.89 MWD+IFR+MS 7400.00 50.40 232.71 6823.47 6760.97 -865.26 -1135.19 0.00 6004918.91 583444.12 MWD+IFR+MS 7429.86 50.40 232.71 6842.50 6780.00 -879.20 -1153.50 0.00 6004904.76 583425.97 MPK-22 TO Up 7500.00 54.11 231.38 6885.42 6822.92 -913.32 -1197.21 5.50 6004870.16 583382.65 MWD+IFR+MS 7520.88 55.22 231.00 6897.50 6835.00 -924.00 -1210.49 5.50 6004859.33 583369.50 Top Kuparuk D 7600.00 59.43 229.67 6940.21 6877.71 -966.51 -1261.73 5.50 6004816.25 583318.75 MWD+IFR+MS 7700.00 64.76 228.15 6986.99 6924.49 -1024.58 -1328.29 5.50 6004757.42 583252.86 MWD+IFR+MS 7800.00 70.11 226.75 7025.36 6962.86 -1087.02 -1396.28 5.50 6004694.23 583185.59 MWD+IFR+MS 7872.74 74.00 225.79 7047.77 6985.27 -1134.85 -1446.27 5.50 6004645.84 583136.15 End Dir : 7872 7900.00 74.00 225.79 7055.28 6992.78 -1153.12 -1465.05 0.00 6004627.36 583117.57 MWD+IFR+MS 7944.34 74.00 225.79 7067.50 7005.00 -1182.84 -1495.60 0.00 6004597.30 583087.36 Top Kuparuk C 7962.48 74.00 225.79 7072.50 7010.00 -1195.00 -1508.11 0.00 6004585.00 583075.00 MPK-22 T1 top 7982.48 74.00 225.79 7078.01 7015.51 -1208.40 -1521.89 0.00 6004571.44 583061.37 Start Dir 12/10 7999.83 76.02 225.26 7082.50 7020.00 -1220.15 -1533.85 12.00 6004559.56 583049.55 MPK-22 poly 8000.00 76.04 225.26 7082.54 7020.04 -1220.26 -1533.96 12.00 6004559.45 583049.43 MWD+IFR+MS 8100.00 87.69 222.35 7096.67 7034.17 -1291.60 -1602.34 12.00 6004487.35 582981.88 MWD+IFR+MS 8109.59 88.81 222.08 7096.96 7034.46 -1298.70 -1608.78 12.00 6004480.17 582975.52 End Dir : 8109 8200.00 88.81 222.08 7098.84 7036.34 -1365.79 -1669.35 0.00 6004412.41 582915.72 MWD+IFR+MS 8300.00 88.81 222.08 7100.92 7038.42 -1439.99 -1736.35 0.00 6004337.45 582849.57 MWD+IFR+MS 8400.00 88.81 222.08 7103.00 7040.50 -1514.20 -1803.35 0.00 6004262.50 582783.42 MWD+IFR+MS 8500.00 88.81 222.08 7105.07 7042.57 -1588.41 -1870.35 0.00 6004187.55 582717.27 MWD+IFR+MS 8600.00 88.81 222.08 7107.15 7044.65 -1662.61 -1937.35 0.00 6004112.59 582651.12 MWD+IFR+MS 8616.80 88.81 222.08 7107.50 7045.00 -1675.08 -1948.61 0.00 6004100.00 582640.00 MPK-22 T4 Up 8700.00 87.38 217.29 7110.27 7047.77 -1739.05 -2001.70 6.00 6004035.44 582587.65 MWD+IFR+MS 8771.34 86.17 213.18 7114.28 7051.78 -1797.21 -2042.78 6.00 6003976.82 582547.24 End Dir : 8771 8800.00 86.17 213.18 7116.19 7053.69 -1821.15 -2058.43 0.00 6003952.71 582531.86 8894.00 86.17 213.18 7122.47 7059.97 -1899.64 -2109.76 0.00 6003873.65 582481.42 "' 8894.43 86.17 213.18 7122.50 ~ 7060.00 -1900.00 -2110.00 0.00 6003873.28 582481.19 WELL DETAILS Name +N/·S +EI-W Northing Easting Latitude Longitude Slot Plan MPK-22 11042.02 1097.62 6005796.90 5114569.:13 70"25'32.747N 149°18'39.055W N/A ANTI·COLLISION SETTINGS COMPANY DETAILS BPAmoC(l Interpolation MethodMD Depth Range From: 34.30 Maximum Range: 1086.01 Intcrval: 25.00 To: 8894.43 Rcference: Plan: MPK-22 WPlO Cakulation Method: Mjnimum Curvature Error System: ISCWSA Scan Method: Trav Cy!inder North ElTorSurface: mlipticaJ+Casing Warning Method: Rules Based 80 75 From Colour 34 500 1000 1500 2000 2500 3000 3500 4000 5000 6000 7000 8000 °IÒggg 1000 00 00 00 00 3 o 5 13 o 27 5 38 SURVEY PROGRAM Depth Fm Depth To Survey/Plan 34.30 1900.00 Planned: MPK·22 W1'1O V!08 1900.00 8894.43 Planned: MPK-22 W1'IO V108 ToMD 500 1000 1500 2000 2500 3000 3500 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 Too] CB-GYRO-SS MWD+IFR+MS WELL1'AH¡ DETAILS Plan M1'K-22 Rig: Ref. DatlUU· 34.3+28.2 62.50fi V.Section Origin Origin Starting Angle +N/-S +Ef-W From TVD 227.28" 0.00 0.00 34.30 LEGb""ND CASCADE-1A (CASCADE-IA), Major Risk MPK..o2 (MPK..o2), Major Risk M1'K..o5 (MPK..o5), Major Risk MPK..{}6 (MPK..(Ió). Major Risk MPK-J3 (MPK-D), Major Risk MPK-17 (MPK-I7), Major Risk MPK-18A(MPK-18A), ~ajor Risk MPK-18 (MPK-18), Major Risk M1'K-21 (MPK-21), Major Risk MPK-2¡ (MPK·21A), Major Risk MPK·21 (M1'K-21APBI), Major Risk M1'K-25 (MPK-25), Major Risk MPK-30 (MPK.30), Major Risk M1'K-33 (M1'K-33), Major Risk MPK-34 (MPK-34), Major Risk MPK-37 (MPK-37), Major Risk MPK-3S (MPK-38), Major Risk MPK-38 (Plan MPK-38A), Major Risk MPK-43A (MPK-43A), Major Risk M1'K-43 (MPK-43), Major Risk Plan MPK..fI9 (P]an MPK--(9), Major Risk Plan MPK·22 (P]an MPK-22 o!d), NOERRORS Plan MPK-22 MPK-22 WPIO SECTION DETAILS S" MD Ine Ad TVD +N/-S +EI·W Dug TFace VScc Target 1 34.30 0.00 0.00 34.30 0.00 0.00 0.00 0.00 0.00 2 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 3 600.00 3.00 230.00 599.86 -5.05 -6.02 Loo 230.00 7.84 4 900.00 0.00 0.00 899.73 -10.09 -12.03 1.00 180.00 15.69 , 4982.00 0.00 0.00 4981.73 -10.09 -12.03 0.00 0.00 15.69 6 6242.12 50.40 232.71 6085.48 -324.77 -425.31 4.00 232.71 532.79 7 7429.86 50.40 232.71 6842.50 -879.20 -1153.50 0.00 0.00 1443.91 MPK-22 TO Upper Kup D 8 7872.74 74.00 225.79 7047.77 -1134.85 -1446.27 5.50 -16.31 1832.44 9 7962.48 74.00 225_79 7072.50 ~1195.oo -1508.Ji 0.00 0.00 1918.67 MPK-22T1 top C1 10 7982.48 74.00 225.79 7078.01 -1208.40 -1521.89 0.00 0.00 1937-89 11 8109.59 88.81 222.08 70%.96 -1298.70 -1608.78 12.00 -14.25 2062.98 12 8616.80 88.81 222.08 7107.50 -J675.0S -1948.61 0.00 0.00 2568.00 MPK-22 T4 Upper Mid CI 13 8771.34 86.17 213.18 7114.28 -1797.21 -2042.78 6.00 -106.69 2720.04 14 8894.43 86.17 213.18 7122.50 -1900.00 -2110.00 0.00 0.00 2839.16 MPK-221'5 Lower C1 . . Sperry-Sun Anticollision Report 4962.77 4962.50 9.625 12.250 9 5/8" 7962.48 7072.50 7.000 8.500 7" 8894.00 7122.47 4.500 6.125 4 1/2" Plan: MPK-22 WP10 Principal: Yes Summary Date Composed: Version: Tied-to: 3/2/2004 108 From Well Ref. Point M pt Cascade CASCADE-1A CASCADE-1A V1 5295.42 5825.00 221.67 117.08 104.59 Pass: Major Risk M Pt K Pad MPK-02 MPK-02 V1 975.19 975.00 144.41 16.24 128.17 Pass: Major Risk MPtKPad MPK-05 MPK-05 V1 1200.19 1200.00 160.45 17.79 142.66 Pass: Major Risk MPtKPad MPK-06 MPK-06 V1 424.04 425.00 122.16 8.17 113.98 Pass: Major Risk MPtKPad MPK-13 MPK-13 V5 1494.30 1500.00 79.30 24.62 54.68 Pass: Major Risk MPtKPad MPK-17 MPK-17V1 3725.09 3725.00 83.66 43.54 40.12 Pass: Major Risk MPtKPad MPK-18A MPK-18A V1 1625.05 1625.00 44.62 27.23 17.39 Pass: Major Risk MPtKPad MPK-18 MPK-18 V24 1625.05 1625.00 44.62 27.23 17.39 Pass: Major Risk MPtKPad MPK-21 MPK-21 V3 777.15 775.00 111.58 12.37 99.21 Pass: Major Risk MPtKPad MPK-21 MPK-21A V9 777.15 775.00 111.58 12.48 99.10 Pass: Major Risk MPtKPad MPK-21 MPK-21APB1 V3 777.15 775.00 111.58 12.48 99.10 Pass: Major Risk MPtKPad MPK-25 MPK-25 V2 Plan: Undefi 851.06 850.00 98.38 13.26 85.11 Pass: Major Risk M Pt K Pad MPK-30 MPK-30 V4 1023.95 1025.00 46.74 17.09 29.65 Pass: Major Risk M Pt K Pad MPK-33 MPK-33 V1 1098.52 1100.00 121.07 18.62 102.45 Pass: Major Risk M Pt K Pad MPK-34 MPK-34 V3 600.67 600.00 90.32 10.22 80.11 Pass: Major Risk M Pt K Pad MPK-37 MPK-37 V1 1725.19 1725.00 150.17 25.29 124.88 Pass: Major Risk MPtKPad MPK-38 MPK-38 V1 3324.72 3325.00 119.46 42.87 76.59 Pass: Major Risk M Pt K Pad MPK-38 Plan MPK-38A V5 Plan: 3324.72 3325.00 119.46 42.83 76.63 Pass: Major Risk M Pt K Pad MPK-43A MPK-43A V3 900.26 900.00 183.84 13.35 170.49 Pass: Major Risk MPtKPad MPK-43 MPK-43 V1 900.26 900.00 183.84 13.35 170.49 Pass: Major Risk MPtKPad Plan MPK-09 Plan MPK-09 V3 Plan: M 527.91 525.00 144.65 11.82 132.83 Pass: Major Risk MPtKPad Plan MPK-22 Plan MPK-22 old VO Pia 7425.00 7425.00 0.00 0.00 0.00 FAIL: NOERRORS Site: M pt Cascade Well: CASCADE-1A Rule Assigned: Major Risk Wellpath: CASCADE-1A V1 Inter-Site Error: 0.00 ft 4171.10 4170.83 4250.00 4170.83 3.42 6.16 76.65 76.65 7.000 1073.61 51.98 1021.63 Pass 4192.01 4191.74 4275.00 4191.74 3.44 6.38 76.48 76.48 7.000 1060.27 52.28 1007.99 Pass 4212.78 4212.50 4300.00 4212.50 3.45 6.61 76.31 76.31 7.000 1046.72 52.60 994.12 Pass 4233.40 4233.13 4325.00 4233.13 3.47 6.84 76.13 76.13 7.000 1032.96 52.91 980.05 Pass 4253.89 4253.62 4350.00 4253.62 3.49 7.06 75.95 75.95 7.000 1019.00 53.24 965.76 Pass 4274.24 4273.97 4375.00 4273.97 3.51 7.30 75.77 75.77 7.000 1004.85 53.56 951.29 Pass 4294.51 4294.23 4400.00 4294.23 3.53 7.53 75.58 75.58 7.000 990.58 53.89 936.69 Pass 4314.69 4314.41 4425.00 4314.41 3.54 7.77 75.39 75.39 7.000 976.21 54.23 921.98 Pass 4334.78 4334.51 4450.00 4334.51 3.56 8.01 75.18 75.18 7.000 961.74 54.57 907.16 Pass 4354.77 4354.50 4475.00 4354.50 3.58 8.26 74.98 74.98 7.000 947.13 54.92 892.21 Pass 4374.60 4374.33 4500.00 4374.33 3.60 8.50 74.76 74.76 7.000 932.31 55.27 877.04 Pass 4394.26 4393.99 4525.00 4393.99 3.61 8.75 74.55 74.55 7.000 917.25 55.63 861.62 Pass 4413.75 4413.47 4550.00 4413.47 3.63 9.00 74.33 74.33 7.000 901.97 55.99 845.98 Pass 4433.06 4432.78 4575.00 4432.78 3.65 9.25 74.11 74.11 7.000 886.47 56.35 830.12 Pass . . Sperry-Sun Anticollision Report 4452.19 4451.92 4600.00 4451.92 3.67 9.51 73.89 73.89 7.000 870.75 56.72 814.03 Pass 4471.14 4470.86 4625.00 4470.86 3.68 9.77 73.66 73.66 7.000 854.82 57.10 797.73 Pass 4489.90 4489.63 4650.00 4489.63 3.70 10.03 73.42 73.42 7.000 838.69 57.48 781.20 Pass 4508.56 4508.29 4675.00 4508.29 3.72 10.30 73.17 73.17 7.000 822.45 57.87 764.58 Pass 4527.19 4526.91 4700.00 4526.91 3.73 10.57 72.91 72.91 7.000 806.18 58.27 747.91 Pass 4545.77 4545.49 4725.00 4545.49 3.75 10.84 72.64 72.64 7.000 789.89 58.70 731.20 Pass 4564.31 4564.04 4750.00 4564.04 3.77 11.10 72.35 72.35 7.000 773.59 59.11 714.47 Pass 4582.86 4582.59 4775.00 4582.59 3.78 11.33 72.05 72.05 7.000 757.32 59.50 697.82 Pass 4601.45 4601.17 4800.00 4601.17 3.80 11.55 71.73 71.73 7.000 741.12 59.93 681.19 Pass 4620.06 4619.78 4825.00 4619.78 3.82 11.78 71.40 71.40 7.000 724.99 60.38 664.60 Pass 4638.69 4638.42 4850.00 4638.42 3.83 12.00 71.04 71.04 7.000 708.92 60.84 648.09 Pass 4657.32 4657.04 4875.00 4657.04 3.85 12.22 70.67 70.67 7.000 692.89 61.31 631.58 Pass 4675.93 4675.66 4900.00 4675.66 3.87 12.43 70.27 70.27 7.000 676.88 61.79 615.09 Pass 4694.53 4694.26 4925.00 4694.26 3.89 12.64 69.86 69.86 7.000 660.90 62.29 598.61 Pass 4713.12 4712.84 4950.00 4712.84 3.90 12.89 69.42 69.42 7.000 644.94 62.85 582.10 Pass 4731.65 4731.37 4975.00 4731.37 3.92 13.16 68.95 68.95 7.000 628.97 63.45 565.52 Pass 4750.12 4749.85 5000.00 4749.85 3.94 13.42 68.46 68.46 7.000 612.98 64.08 548.90 Pass 4768.54 4768.27 5025.00 4768.27 3.95 13.69 67.95 67.95 7.000 596.99 64.74 532.25 Pass 4786.88 4786.60 5050.00 4786.60 3.97 13.97 67.40 67.40 7.000 580.95 65.45 515.50 Pass 4805.07 4804.80 5075.00 4804.80 3.99 14.25 66.82 66.82 7.000 564.82 66.20 498.62 Pass 4823.12 4822.85 5100.00 4822.85 4.01 14.54 66.20 66.20 7.000 548.59 66.98 481.61 Pass 4841.02 4840.75 5125.00 4840.75 4.02 14.82 65.54 65.54 7.000 532.28 67.81 464.48 Pass 4858.85 4858.58 5150.00 4858.58 4.04 15.07 64.84 64.84 7.000 515.97 68.63 447.35 Pass 4876.68 4876.41 5175.00 4876.41 4.06 15.31 64.10 64.10 7.000 499.75 69.49 430.26 Pass 4894.51 4894.24 5200.00 4894.24 4.07 15.56 63.30 63.30 7.000 483.62 70.41 413.21 Pass 4912.35 4912.07 5225.00 4912.07 4.09 15.80 62.45 62.45 7.000 467.59 71.38 396.21 Pass 4930.18 4929.90 5250.00 4929.90 4.11 16.02 61.53 61.53 7.000 451.68 72.39 379.29 Pass 4948.00 4947.73 5275.00 4947.73 4.12 16.25 60.54 60.54 7.000 435.91 73.47 362.44 Pass 4965.83 4965.55 5300.00 4965.55 4.14 16.47 59.47 59.47 7.000 420.30 74.62 345.68 Pass 4983.28 4983.00 5325.00 4983.36 4.16 16.72 58.32 185.60 7.000 404.85 75.74 329.11 Pass 4997.22 4996.95 5350.00 5001.07 4.16 16.99 57.06 184.35 7.000 389.60 77.11 312.49 Pass 5011.30 5011.02 5375.00 5018.67 4.15 17.26 55.69 182.98 7.000 374.64 78.56 296.08 Pass 5025.51 5025.22 5400.00 5036.15 4.14 17.54 54.20 181.48 7.000 359.99 80.11 279.88 Pass 5039.87 5039.58 5425.00 5053.54 4.14 17.82 52.57 179.85 7.000 345.71 81.80 263.91 Pass 5054.44 5054.14 5450.00 5070.91 4.13 18.10 50.79 178.08 7.000 331.92 83.61 248.32 Pass 5069.24 5068.91 5475.00 5088.26 4.12 18.38 48.86 176.15 7.000 318.68 85.54 233.14 Pass 5084.26 5083.90 5500.00 5105.61 4.11 18.66 46.77 174.05 7.000 306.02 87.59 218.43 Pass 5099.49 5099.09 5525.00 5122.93 4.10 18.95 44.49 171.78 7.000 294.00 89.77 204.22 Pass 5114.88 5114.42 5550.00 5140.14 4.09 19.23 42.01 169.30 7.000 282.61 92.07 190.54 Pass 5130.44 5129.90 5575.00 5157.27 4.09 19.51 39.33 166.61 7.000 271.94 94.48 177.45 Pass 5146.16 5145.53 5600.00 5174.29 4.08 19.80 36.43 163.71 7.000 262.05 96.98 165.06 Pass 5162.04 5161.29 5625.00 5191.21 4.07 20.10 33.30 160.58 7.000 253.03 99.61 153.42 Pass 5178.08 5177.19 5650.00 5208.01 4.06 20.40 29.94 157.22 7.000 244.97 102.26 142.71 Pass 5194.27 5193.21 5675.00 5224.70 4.05 20.70 26.36 153.65 7.000 237.96 104.90 133.06 Pass 5210.61 5209.37 5700.00 5241.27 4.04 20.99 22.58 149.86 7.000 232.09 107.46 124.63 Pass 5227.15 5225.68 5725.00 5257.76 4.04 21.29 18.63 145.91 7.000 227.43 109.90 117.54 Pass 5243.89 5242.16 5750.00 5274.19 4.03 21.59 14.56 141.84 7.000 224.03 112.13 111.91 Pass 5260.85 5258.82 5775.00 5290.57 4.02 21.89 10.41 137.69 7.000 221.93 114.09 107.84 Pass 5278.02 5275.64 5800.00 5306.89 4.01 22.18 6.23 133.52 7.000 221.14 115.75 105.39 Pass 5295.42 5292.65 5825.00 5323.17 4.00 22.47 2.08 129.37 7.000 221.67 117.08 104.59 Pass 5313.05 5309.83 5850.00 5339.41 4.00 22.76 358.01 125.30 7.000 223.47 118.06 105.40 Pass . . Sperry-Sun Anticollision Report 5330.91 5327.20 5875.00 5355.62 3.99 23.05 354.07 121.36 7.000 226.49 118.72 107.77 Pass 5349.01 5344.73 5900.00 5371.80 3.98 23.32 350.30 117.58 7.000 230.68 119.05 111.62 Pass 5367.35 5362.44 5925.00 5387.98 3.98 23.59 346.73 114.02 7.000 236.01 119.10 116.91 Pass 5385.93 5380.32 5950.00 5404.15 3.97 23.85 343.40 110.68 7.000 242.41 118.94 123.47 Pass 5404.75 5398.36 5975.00 5420.32 3.96 24.11 340.31 107.59 7.000 249.75 118.63 131.13 Pass 5423.80 5416.55 6000.00 5436.48 3.96 24.34 337.46 104.75 7.000 257.92 118.16 139.76 Pass 5443.10 5434.91 6025.00 5452.65 3.95 24.57 334.85 102.14 7.000 266.71 117.60 149.11 Pass 5462.66 5453.42 6050.00 5468.82 3.95 24.79 332.47 99.76 7.000 276.04 117.02 159.03 Pass 5482.47 5472.08 6075.00 5485.00 3.95 25.01 330.30 97.59 7.000 285.84 116.43 169.40 Pass 5502.53 5490.87 6100.00 5501.17 3.94 25.22 328.33 95.61 7.000 296.02 115.87 180.15 Pass 5522.82 5509.79 6125.00 5517.33 3.94 25.43 326.54 93.82 7.000 306.52 115.36 191.16 Pass 5543.36 5528.82 6150.00 5533.49 3.94 25.64 324.92 92.21 7.000 317.29 114.90 202.39 Pass 5564.12 5547.96 6175.00 5549.64 3.94 25.85 323.46 90.74 7.000 328.28 114.49 213.79 Pass 5585.12 5567.18 6200.00 5565.79 3.94 26.05 322.14 89.42 7.000 339.46 114.16 225.30 Pass 5606.34 5586.48 6225.00 5581.94 3.94 26.25 320.96 88.24 7.000 350.80 113.90 236.90 Pass 5627.78 5605.85 6250.00 5598.11 3.95 26.45 319.90 87.19 7.000 362.27 113.73 248.54 Pass 5649.42 5625.26 6275.00 5614.28 3.96 26.65 318.97 86.25 7.000 373.84 113.64 260.21 Pass 5671.21 5644.65 6300.00 5630.41 3.96 26.85 318.14 85.42 7.000 385.60 113.64 271.95 Pass 5693.12 5663.99 6325.00 5646.49 3.97 27.05 317.41 84.70 7.000 397.56 113.73 283.83 Pass 5715.12 5683.26 6350.00 5662.52 3.98 27.25 316.78 84.07 7.000 409.70 113.90 295.80 Pass 5737.22 5702.44 6375.00 5678.50 4.00 27.45 316.24 83.53 7.000 422.00 114.16 307.84 Pass 5759.47 5721.58 6400.00 5694.49 4.01 27.64 315.78 83.06 7.000 434.33 114.48 319.85 Pass 5781.87 5740.67 6425.00 5710.50 4.03 27.83 315.39 82.68 7.000 446.65 114.87 331.79 Pass 5804.42 5759.70 6450.00 5726.55 4.04 28.02 315.07 82.36 7.000 458.96 115.33 343.63 Pass 5827.08 5778.63 6475.00 5742.61 4.07 28.20 314.82 82.10 7.000 471.26 115.86 355.40 Pass 5849.78 5797.39 6500.00 5758.67 4.09 28.38 314.63 81.92 7.000 483.66 116.45 367.22 Pass 5872.50 5815.96 6525.00 5774.73 4.12 28.55 314.51 81.80 7.000 496.18 117.10 379.09 Pass 5895.21 5834.31 6550.00 5790.78 4.14 28.72 314.45 81.73 7.000 508.82 117.81 391.01 Pass 5917.91 5852.45 6575.00 5806.81 4.18 28.91 314.44 81.72 7.000 521.53 118.63 402.90 Pass 5940.63 5870.38 6600.00 5822.80 4.21 29.10 314.46 81.75 7.000 534.25 119.51 414.74 Pass 5963.37 5888.10 6625.00 5838.76 4.25 29.28 314.52 81.80 7.000 546.97 120.42 426.55 Pass 5986.11 5905.60 6650.00 5854.67 4.29 29.47 314.61 81.89 7.000 559.71 121.37 438.34 Pass 6008.82 5922.84 6675.00 5870.56 4.33 29.65 314.73 82.01 7.000 572.49 122.36 450.13 Pass 6031.45 5939.78 6700.00 5886.44 4.37 29.83 314.88 82.17 7.000 585.37 123.41 461.96 Pass 6053.98 5956.40 6725.00 5902.29 4.42 30.00 315.08 82.36 7.000 598.35 124.49 473.86 Pass 6076.39 5972.71 6750.00 5918.13 4.47 30.18 315.30 82.59 7.000 611.43 125.60 485.83 Pass 6098.73 5988.72 6775.00 5933.95 4.52 30.34 315.55 82.83 7.000 624.54 126.71 497.82 Pass 6121.05 6004.47 6800.00 5949.74 4.58 30.51 315.81 83.10 7.000 637.62 127.88 509.74 Pass 6143.32 6019.93 6825.00 5965.50 4.63 30.67 316.09 83.37 7.000 650.68 129.06 521.62 Pass 6165.53 6035.11 6850.00 5981.25 4.69 30.83 316.38 83.66 7.000 663.72 130.25 533.46 Pass 6187.69 6050.00 6875.00 5996.97 4.75 30.99 316.68 83.97 7.000 676.73 131.46 545.27 Pass 6209.79 6064.60 6900.00 6012.68 4.81 31.15 317.00 84.29 7.000 689.73 132.69 557.04 Pass 6231.82 6078.89 6925.00 6028.38 4.88 31.30 317.33 84.62 7.000 702.70 133.94 568.77 Pass 6253.25 6092.57 6950.00 6044.06 4.95 31.52 317.67 84.95 7.000 715.68 135.16 580.52 Pass 6274.19 6105.92 6975.00 6059.70 5.01 31.79 317.99 85.28 7.000 728.69 136.34 592.35 Pass 6295.13 6119.27 7000.00 6075.31 5.08 32.05 318.30 85.59 7.000 741.75 137.52 604.23 Pass 6316.06 6132.61 7025.00 6090.89 5.15 32.32 318.60 85.89 7.000 754.86 138.70 616.15 Pass 6336.98 6145.94 7050.00 6106.46 5.22 32.58 318.89 86.17 7.000 768.01 139.83 628.17 Pass 6357.86 6159.25 7075.00 6122.08 5.30 32.84 319.17 86.46 7.000 781.20 140.96 640.24 Pass 6378.71 6172.54 7100.00 6137.75 5.37 33.09 319.46 86.74 7.000 794.44 142.11 652.33 Pass . . Sperry-Sun Anticollision Report 6399.52 6185.80 7125.00 6153.47 5.44 33.36 319.74 87.02 7.000 807.72 143.28 664.44 Pass 6420.28 6199.04 7150.00 6169.23 5.52 33.61 320.01 87.30 7.000 821.08 144.44 676.64 Pass 6440.97 6212.22 7175.00 6185.01 5.59 33.85 320.29 87.57 7.000 834.55 145.57 688.98 Pass 6461.57 6225.35 7200.00 6200.80 5.67 34.09 320.56 87.85 7.000 848.14 146.65 701.49 Pass 6482.10 6238.43 7225.00 6216.61 5.74 34.32 320.83 88.12 7.000 861.83 147.70 714.12 Pass 6502.59 6251.50 7250.00 6232.37 5.82 34.58 321.09 88.38 7.000 875.59 148.85 726.74 Pass 6523.09 6264.56 7275.00 6248.06 5.90 34.84 321.34 88.62 7.000 889.40 149.99 739.41 Pass 6543.58 6277.62 7300.00 6263.68 5.98 35.10 321.57 88.85 7.000 903.25 151.11 752.14 Pass 6564.07 6290.68 7325.00 6279.23 6.06 35.35 321.79 89.07 7.000 917.15 152.22 764.93 Pass 6584.55 6303.73 7350.00 6294.79 6.14 35.61 322.00 89.29 7.000 931.06 153.33 777.73 Pass 6605.03 6316.79 7375.00 6310.37 6.22 35.86 322.21 89.49 7.000 944.99 154.43 790.56 Pass 6625.50 6329.83 7400.00 6325.97 6.30 36.11 322.41 89.70 7.000 958.93 155.53 803.39 Pass 6645.97 6342.88 7425.00 6341.60 6.38 36.35 322.62 89.90 7.000 972.87 156.61 816.27 Pass 6666.45 6355.93 7450.00 6357.30 6.47 36.58 322.82 90.10 7.000 986.80 157.66 829.14 Pass 6686.93 6368.99 7475.00 6373.08 6.55 36.81 323.02 90.30 7.000 1000.69 158.71 841.99 Pass 6707.43 6382.05 7500.00 6388.93 6.63 37.05 323.22 90.50 7.000 1014.57 159.76 854.81 Pass 6727.95 6395.13 7525.00 6404.85 6.72 37.28 323.42 90.70 7.000 1028.40 160.82 867.58 Pass 6748.53 6408.25 7550.00 6420.79 6.81 37.51 323.61 90.90 7.000 1042.17 161.88 880.28 Pass 6769.16 6421.40 7575.00 6436.76 6.89 37.74 323.80 91.08 7.000 1055.86 162.94 892.92 Pass 6789.86 6434.59 7600.00 6452.74 6.98 37.98 323.98 91.26 7.000 1 069.49 163.99 905.49 Pass 6810.55 6447.77 7625.00 6468.72 7.07 38.22 324.15 91.44 7.000 1083.12 165.08 918.04 Pass Site: M PI K Pad Well: MPK-02 Rule Assigned: Major Risk Wellpath: MPK-02 V1 Inter-Site Error: 0.00 ft 174.99 174.99 175.00 174.99 0.41 0.12 338.38 338.38 148.54 3.90 144.63 Pass 199.99 199.99 200.00 199.99 0.50 0.14 338.38 338.38 148.26 4.49 143.77 Pass 224.99 224.99 225.00 224.99 0.55 0.17 338.39 338.39 147.97 4.98 142.99 Pass 249.99 249.99 250.00 249.99 0.61 0.19 338.41 338.41 147.66 5.48 142.19 Pass 274.99 274.99 275.00 274.99 0.66 0.22 338.43 338.43 147.33 5.97 141.36 Pass 299.98 299.98 300.00 299.98 0.72 0.25 338.46 338.46 146.97 6.47 140.51 Pass 324.78 324.78 325.00 324.98 0.73 0.27 338.51 108.51 146.62 6.81 139.81 Pass 349.57 349.57 350.00 349.98 0.74 0.30 338.60 108.60 146.31 7.16 139.14 Pass 374.37 374.37 375.00 374.97 0.75 0.32 338.73 108.73 146.03 7.51 138.52 Pass 399.16 399.16 400.00 399.97 0.75 0.34 338.89 108.89 145.79 7.85 137.93 Pass 423.95 423.94 425.00 424.97 0.78 0.37 339.10 109.10 145.58 8.25 137.33 Pass 448.73 448.72 450.00 449.97 0.80 0.39 339.35 109.35 145.40 8.64 136.76 Pass 473.51 473.49 475.00 474.96 0.83 0.42 339.64 109.64 145.26 9.04 136.22 Pass 498.28 498.24 500.00 499.96 0.85 0.44 339.98 109.98 145.14 9.43 135.71 Pass 523.05 522.99 525.00 524.96 0.88 0.47 340.36 110.36 145.06 9.85 135.21 Pass 547.81 547.73 550.00 549.95 0.91 0.50 340.78 110.78 145.02 10.27 134.75 Pass 572.55 572.45 575.00 574.95 0.94 0.53 341.24 111.24 145.03 10.70 134.34 Pass 597.29 597.16 600.00 599.95 0.97 0.56 341.74 111.74 145.09 11.12 133.97 Pass 622.45 622.28 625.00 624.94 0.97 0.59 342.25 112.25 145.16 11.48 133.67 Pass 00 Vi 149 00 Vi I 149 HI 00 Vi ¡ 149 1 6 00 Vi MPU K-22 Proposed 1-WINJ 2050140 Area of Review SFD 2/17/2005 -.J o t-,J 0> 8 z SONORA 0 STEWMAN BP EXPLORA TIONAK INC "Mastercard Check" PO BOX 196612 MB 7-5 ANCHORAGE, AK 99519-6612 89-6/1252 1 22 DATE OZ-ll-DC)' ~ò¡~ 6FHE . ~~c?c"'L:- I $ lDS> ..C)(J (?\ e..~ rQ¿ _ G. \{\ ~~"":>.- DOLLARS First National Sa Alaska :::~?~'_~7v; ~/~_ . I: ~ 25 2000(;OI:qq ~I.,"I(; 2 2 71" ~ 5(;1.,11- 0 ~ 2 2 . . . TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERIP ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME /J1¡?¿¿ ~-¿2-~- PTD# 2-D S- - 02-2-- »evelopment V Service Exploration Stratigraphic CHECK WHAT ADD-ONS "'CLUE n. AP:PLJES (OPTIONS) MULTI Tbe permit is for a Dew weJlbore 'segmeut of LATERAL e:xistiug weD . Permit No, API No. . (If API Dumber ProductioD. sbould cODtiDue to be reponed as last two, (2) digits a fUDctioD' of tbe origiual API Dumber. stated are between 60-69) above. . PILOT HOLE )u accordaDce witb' 20 AAC 25.005(t), all (PH) records, data aDd logs acquired for tbe pilot bole must be clearly differeutiated In botb Dame (name ou permit pJus PH) " aud API Dumber (50 - 70/80) from records, data aud logs acquired for well (Dame on permit). SPACING Tbe permit is Bpproved subject -to fuD EXCEPTION " comp1iBnce witb 20 AAC 25..0SS~ Approval to perforate Bnd produce is cODtingeut upou issuance of ~ cODservation order approviag a spaciug e:J ception. (Company Name) assumes tbe JiabiUty of auy protest to tbe spaciug .e:xception tbat mey occur. : DRY DITCH An dry ditch sample sets submitted to the SAMPLE Commission must be iD DO greater -tban 30' " sample intervals from below tbe permafrost or from where samples are first caugbt and 10' sample biter:vals through target zones. " Field & Pool MILNE POINT, KUPARUK RIVER OIL - 525100 Well Name: MILNE PT UNIT KR K-22 Program SER Well bore seg PTD#:2050220 Company BPEXPLORATION (ALASKA) INC InitialClasslType SER/PEND GeoArea 890 Unit 11328 On/OffShore On Annular Disposal 1 P~rmitfee attaçheJ:l . . . . . . . ~ ~ . . . . .. . . . . . . . ~ ~ . . . . .Y~s ~ ~ ~ . ~ ~ ~ ~ . . . . . . . . . . . . . . ~ ~ . ~ . . . . . . . . . . ~ . . . . . 2 ~Leas~mJlJlberappropriSite . . . ~ ~ .. ~....... ..... ~ . . . . . . Y~s . . ~ . . . . ~ . . . . . . . . ~ . . . . . . . . . ~ ~ . . . 3 ~U~nique weILn.a[T1~~a[1d Ol!mb~er ~ ~ . ~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ ~ . . . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ . ~ ~ . Y~s ~ ~ ~ ~ ~ . . . . . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ . . . . ~ ~ . ~ ~ . ~ . . ~ . . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . . . . . ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ . . ~ ~ . 4 WenJocSitedinad~efioe.dpool . ~ ~ ~.. ....... ~. ~.... ~ .... Y~s- . .Kup.arukRjverOil~0.0[,governedbyCon~seryati.c)[10rd.er l o.432C ~... ~. 5 WeJlJocSited properdistance~ from driJling uoitbouod~(y~ . . Y~s ~ . . . ~ . . WelJb.ore.will be~more thSiO 500' from exteroal boundary.. . . . ~ ~ . . . ~ . . . . . . . . 6 WeJlJocSited proper .distance~ from otber welJs~ . . . ~ . . . . . ~ Y~s ~ . . . . . . l O interweJl $pacing restriçtions.. ~ . . . . . . . . . . . . . . ~ . . ~ ~ ~ . . . . . 7 ~S~utfiçieotaçreageaYail<lble in. drilJiog unit ~ ~ ~ ~ ~ . . . . . . . . . . . . . . . Yes ~ . . . ~ ....... . . . . . . . ~ . . . . . . . . . . . . . ~ ~ . . . . 8 Jf.deviated, js. weJlbore platJlJcJuded . . . . ~ ~ . . ~ . . . . Yes ~ ~ . . ~ ~ . .. ......... ~ . . . . . . . . . . . ~ . . . 9 .Operator ooly affeçted party. . . . . ~ . . . . . . . . . . . . . . . . . . . ~Y~s ~ . . . . . . . ~ . . . . . . . . . . . . . . ~ . . . . . . . . . ~ ~ ~ . . ~ . . . . . . . ~ . . . . . 1 0 ~O'perator bas~appropriate. b.ond inJorce . . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ . . . ~ . . ~ ~ ~ ~ ~ ~ ~ . . . ~ ~ . Y~s ~ ~ ~ ~ ~ . ~ . ~ ~ ~ ~ ~ . ~ ~ ~ ~ ~ ~ ~ . . ~ . . . ~ . ~ . ~ ~ ~ ~ ~ ~ . ~ ~ ~ . ~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ . . . ~ . ~ ~ ~ ~ ~ ~ . ~ . . . . 11 P~rmit. c.al1 be issl!ed witbout co.nservatioo order ~ ~ ~ ~ ~ . . . . Y~s . ~ . . ~ . . . ~ ~ . . . . . ~ Appr Date 12 P~rmit c.al1 be iSSl!ed witbout admioistratille~approvaL . . . . . . ~ . . . . . . . . Y~s . . . . . . . . . . . . . ~ . . ~ . SFD 2/17/2005 13 Can permit be approved before 15-day wait Yes 14 WellJocated withio area and strata .authorized by. I [1jectioo Ord~r # (puUOfl in~co[T1m~l1ts). (For. Y~s . 8rea Injectjon.Order No.. 10-6. ..... ~ 15 ~AJlweIJs-,,.{it]1in.1l4.mile~area~ofreyiewid~otified(FOrservj~-"'le[looly)~ ~ ~ ~ ~ ~ ~ ~. ~. ~ ~ ~. Y~s- ~ ~ ~ ~ ~ ~MPUK~2.5.MI?U!<:37~ ~ ~.. ~ ~.. ~ ~ ~ ~ ~ ~ ~ ~ ~. ~ ~.... ~ ~ ~ ~ ~ ~ ~ ~"".. ~ ~ ~ ~ ~ ~ ~ ~ ~. ~ ~ ~... 16 Pre-produced i[1jector; J:lur<ltionof pre-proJ:luctiolJ I~ss. than.3IJlootbs.(Forservice well onJy) . No. . ~ . . . . . . . . . . ~ . . . . 17 AÇMP.F:indjng.ofCon,Si$te[1çy.h.as beenjssued~forJbis pr.oieçt. . . . . . .NA ~ . . . . . . . . . . . . . . . 18 ~Col1du.ctor string.provided . Y~s ~ 19Surfa~.casingprQtec.ts alLkJlown USDWs . ~ . . . . . . . NA . . 20 .CMT v~ol adeql!ateJo çirc.ulateoncOlJd.uctor. &. surf.C$g . . . . . . . ~ . . . . . . . . . Y~s . . . ~ ~ 21 .CMTvoladequateJotie-inJongstriJlgto.sUrfcsg...... .. No... PIç¡oi$for1000'oLfilJabovethe7"shoe. 22CMTwill çoyer.aJl koownpro~ductiYe borilon.s. . ~ . . . . . . . . . . . No . . . . . . . Slotted Jil1er .completio[1 pl~l1ned.. 23Casil1g deslgl1s ad.e~uate for C,.T, B.&permafrost. . ~ Y~s . 24 Mequ<ltetankç¡ge.or re~serve pit. . . . . . . . ~ . . . . . . . . . . .... .. Y~s ~ . Rig isequippè.d.with $t~elp¡ts.. NQ reservepjtplaJloed, All wç¡ste toapprove~d.dispsoal wells.. 25 Jf.are-drill~ has.a. to-403 for Sibandonment be~11 ç¡pproved . . . . .NA . . ~ . . . . . . . . . . . . . . . 26 ~Mequ<lte.we[lbore separç¡tionproposeJ:l. . ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ . . . . . ~ ~ ~ ~ ~ ~ ~ ~ ~ . . . . ~ ~ Y~s ~ . ~ ~ ~ ~ ~ I?ro~ilJlit)l. an<llysis perf.orme.d, Jrayeling cylil1der pIOt.iocJu.ded. ~ GyrosJiJ<ely to.1l00'.~ ~ . . ~ . ~ ~ ~ ~ ~ ~ ~ . . ~ ~ . 27 Jf.diverter req.uired, does jtmeet reguJatioos~ ~ . . . Y~s . . . . . . . . ~ ~ ~ ~ . . . . . . . . . . .. ......... ~ . . ~ ~ ~ . . . . . . . . . . . . . . 28 .Drilliog fluid. program schelJlç¡tic& equipJist.adequç¡te~ . . . . . . . Yes- Maximum expected formation pressure7,8~EMW.. Plal10edMW .10.1 ppg for:. HRZ anJ:l9,0. -.9, 1. ppg jn Kupç¡ruk.. 29 .BOPEs,.d.othey meet.reguJatioo . . . . . . . . . . . ~ ~ . . . . . . . . . Y~s ~ ~ . ~ ~ . ~ ~ . . . . . . . ~ ~ . . . . .. . ~ ~ . . . . . . . . . . . . 30 .BOPE~press ra.til19 appropriate;testto(pu.t psig in~CQmmeots). . . . . . . . . . . Y~s . . MAS¡=> calçulate.d.a.2.278 psi. 35.00 psi J30Ptest plç¡on~d. . . . ~ . . . ~ . . . ~ ~ . . . . . . 31 Choke. manifold compJies w/APL R~-53 (May 84). . . ~ . . . . Y~s . ~ ~ ~ . . . . . . ~ . . . ~ . . . . . . . . . ~ . . . . . . . . . . . . . . . . . . . . 32 Work wiJl occur without.operatjon .sbutdo-"'ln~ .... ~ . . .. . . . . . . . . . . ~ . . Y~s ~ ~ . . ~ ~ . . . . . . . . . . . . ~ . . . . . . 33 Js presence. of H2S gas. prob.able ~ . . . . . No Up 1.0.20 ppm .H2S reported. o.n.K paJ:l. M.ud shoul.dpre.clude H2S on rig, Rig ha$sensor:.s.a[1d alç¡rms, 34 Mecha.nicaLcoodiUo[1of wells withio 80R Yerified (for s~ervice welJ onJy) ~ ...... . Yes. . . . Yes, MPK-25 Jlot.drilled .below surface ca.sing. MPK-.37 çlosest approç¡ch. 1670'dista[1ta.tTD ~ ~ ~ . . . . . . . . . . 35 Permitcal1beissl!edwlohYdrogen.s~ulfidemeasures~ ........ ~.. No.. ~.. ~ ,.MPU!<~Oß.aJldMPU.K~38.h.avelJleasuredm.ore.tban2~0.ppm.H2S ...... . ~ ~....... 36 .D.ata.preseotedon~pote.ntialoverpres.sure.zooe$... ~ ~'.... ......... Yes~ .Expectedpressur~Jangejs8Ato7..8.ppgwithil)(eservojr;willbedrilledwitn~9..Q-.9J.ppg[T1ud.. ~'.... Appr Date 37 ~S~ismic.aJlalysjs Qf$baJlow gas.zol1es.. ~ ~ . . . . . . . . . . . ~NA . .. ~. Hydrates.expecte; mud weight may be inçreas~ed to 10,1.10 çontroLhydrates.. . . . . ~ ~ SFD 2/17/2005 38Seabedcooditioo survey (if off-sh.ore) . . . ~ ~ . . . . ~ . . . . . . . ~ . . . . . ~ . . . . . ~ . NA . . ~ ~ ~ . . . . . . ~ ~ . . . . . . . . . . . ~ ~ ~ ~ . . . . . ~ . ~ ~ . ~ . . ~ ~ ~ . . . . . . . . . 39 . Contact oam.elp]1oneforweekly progress reports [explorç¡to(y .0[1ly] . . . . . . . . . ~ . . . .NA . . . . ~ . . . . . ~ ~ . . . . . ~ ~ ......... . ~ . . . ~. ....... .. ~ ~ . . ~ . . . . Administration Engineering Appr Date TEM 2/22/2005 þ~ Geology - - - - - - - - - - - - - - - - o o . . Geologic Commissioner: OTS - - - - - - - - . M aquifers ex~mpted,AOCFR147.102. (b) (3). . - - - - - - - - - - - - - - - - - - - - - - - - - Date: Engineering Commissioner: ~o ji:""~J' Date ~) 22./0' . . Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. "'3 n--~ ().:t (l - . 8oS-- ð(}.;) Sperry-Sun Drllllng Services 4IIÞ LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Wed Apr 12 15:52:24 2006 Reel Header Service name........... ..LISTPE Date. . . . . . . . . . . . . . . . . . . . .06/04/12 Origin. . . . . .. .. .. . . . .... .STS Reel Name. .......... .....UNKNOWN Continuation Number. .....01 Previous Reel Name. .... ..UNKNOWN Comments........... .... ..STS LIS Writing Library. Scientific Technical Services Tape Header Service name.... ........ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .06/04/12 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name.............. ..UNKNOWN Continuation Number.... ..01 Previous Tape Name..... ..UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPK-22 PB1 500292324970 B.P. Exploration (Alaska) Inc. Sperry Drilling Services 12-APR-06 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0003642743 R. FRENCH E. VAUGHN MWD RUN 2 MW0003642743 R. FRENCH D. GREEN MWD RUN 3 MW0003642743 C.A. DEMOSKI D. GREEN # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 3 12N 11E 3661 1987 62.45 28.20 # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE BIT SIZE (IN) 12.250 8.750 6.125 CASING SIZE (IN) 20.000 9.625 7.000 DRILLERS DEPTH (FT) 114.0 3535.0 8090.0 # REMARKS: . . 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUNS 1-3 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). MWD RUN 3 ALSO INCLUDED COMPENSATED THERMAL NEUTRON POROSITY (CTN), AZIMUTHAL LITHO-DENSITY (ALD), AND AT-BIT INCLINATION (ABI). 4. MWD DATA ARE CONSIDERED PDC PER E-MAIL RECEIVED FROM D. DORTCH (SAIC/BP) ON 21 MARCH 2006, QUOTING AUTHORIZATION FROM MIKIE WEEKS (BP GEOSCIENTIST) . 5. MWD RUNS 1-3 REPRESENT WELL MPK-22 PB1 WITH API#: 50-029-23249-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF 8324'MD/7097'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE MATRIX, FIXED HOLE SIZE) . CTFA SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN) . SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN) . SNP2 = SMOOTHED NEAR-DETECTOR-ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN) . SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. ALDSLIDE = NON-ROTATED INTERVALS REFLECTING SENSOR DEPTHS. PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: 6.125" MUD WEIGHT: 9.0 PPG MUD SALINITY: 39000 PPM CHLORIDES FORMATION WATER SALINITY: 10000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE $ File Header Service name......... ... .STSLIB.001 Service Sub Level Name... Version Number... ....... .1.0.0 Date of Generation...... .06/04/12 Maximum Physical Record. .65535 File Type...............~ Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP RPS RPD FET RPX RPM NPHI NCNT FCNT RHOB DRHO PEF $ 1 . and clipped curveSj all bit runs merged. .5000 START DEPTH 76.5 116.5 165.0 165.0 165.0 165.0 165.0 8004.0 8004.0 8004.0 8019.0 8019.0 8019.0 STOP DEPTH 8273.0 8324.0 8280.0 8280.0 8280.0 8280.0 8280.0 8236.5 8236.5 8236.5 8252.5 8252.5 8252.5 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH ------. BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD $ # REMARKS: BIT RUN NO 1 2 3 MERGED MAIN PASS. $ MERGE TOP 76.5 3545.0 8090.0 MERGE BASE 3545.0 8090.0 8324.0 # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction............ .....Down Optical log depth units..... ..... .Feet Data Reference Point. ............ .Undefined Frame Spacing...... .... .......... .60 .1IN Max frames per record............ . Undefined Absent value.................. ....-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD CNTS 4 1 68 4 2 NCNT MWD CNTS 4 1 68 8 3 RHOB MWD G/CM 4 1 68 12 4 DRHO MWD G/CM 4 1 68 16 5 RPD MWD OHMM 4 1 68 20 6 RPM MWD OHMM 4 1 68 24 7 RPS MWD OHMM 4 1 68 28 8 RPX MWD OHMM 4 1 68 32 9 FET MWD HOUR 4 1 68 36 10 GR MWD API 4 1 68 40 11 PEF MWD BARN 4 1 68 44 12 ROP MWD NPHI MWD FT/H PU-S . 4 1 1 13. 14 68 68 48 52 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 76.5 8324 4200.25 16496 76.5 8324 FCNT MWD CNTS 203.69 1451.97 506.958 466 8004 8236.5 NCNT MWD CNTS 18137.4 41205.8 25281.2 466 8004 8236.5 RHOB MWD G/CM 0.307 3.054 1. 88199 468 8019 8252.5 DRHO MWD G/CM -4.899 0.639 -0.580521 468 8019 8252.5 RPD MWD OHMM 0.18 2000 33.3556 16231 165 8280 RPM MWD OHMM 0.36 2000 21.6279 16231 165 8280 RPS MWD OHMM 0.22 2000 13.3238 16231 165 8280 RPX MWD OHMM 0.2 2000 10.776 16231 165 8280 FET MWD HOUR 0.13 57.19 1.25825 16231 165 8280 GR MWD API 10.98 462.83 90.1296 16394 76.5 8273 PEF MWD BARN 1.41 14.69 5.18735 468 8019 8252.5 ROP MWD FT/H 0.8 928.3 161. 472 16416 116.5 8324 NPHI MWD PU-S 13.38 44.36 28.4694 466 8004 8236.5 First Reading For Entire File......... .76.5 Last Reading For Entire File.......... .8324 File Trailer Service name....... .... ..STSLIB.001 Service Sub Level Name... Version Number.. ........ .1.0.0 Date of Generation...... .06/04/12 Maximum Physical Record. .65535 File Type.............. ..LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name.... ........ .STSLIB.002 Service Sub Level Name. . . Version Number...... .....1.0.0 Date of Generation. .... ..06/04/12 Maximum Physical Record..65535 File Type................ LO Previous File Name.. ... ..STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP RPD FET RPM RPX RPS $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 76.5 116.5 165.0 165.0 165.0 165.0 165.0 # STOP DEPTH 3503.5 3545.0 3496.0 3496.0 3496.0 3496.0 3496.0 . LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RES IS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type... ..0 Logging Direction............ .....Down Optical log depth units..... ......Feet Data Reference Point...... ...... ..Undefined Frame Spacing........... ........ ..60 .1IN Max frames per record............ .Undefined Absent value....... .... .......... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . 10-APR-05 Insite 66.37 Memory 3545.0 222.0 3545.0 .0 3.3 TOOL NUMBER 124724 59672 12.250 SPUD MUD 10.50 90.0 8.0 700 8.8 3.000 2.120 2.700 2.600 60.0 87.8 62.0 62.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD010 OHMM 4 1 68 4 2 RPM MWD010 OHMM 4 1 68 8 3 RPS MWD010 OHMM 4 1 68 12 4 RPX MWD010 OHMM 4 1 68 16 5 FET MWD010 HOUR 4 1 68 20 6 GR MWD010 API 4 1 68 24 7 ROP MWD010 FT/H . 1 68 28 8. First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 76.5 3545 1810.75 6938 76.5 3545 RPD MWD010 OHMM 0.18 2000 31.4938 6663 165 3496 RPM MWD010 OHMM 0.36 2000 31.4853 6663 165 3496 RPS MWD010 OHMM 0.27 2000 26.4356 6663 165 3496 RPX MWD010 OHMM 0.25 2000 20.2039 6663 165 3496 FET MWD010 HOUR 0.13 5.23 0.550383 6663 165 3496 GR MWD010 API 15.47 121. 36 65.2466 6855 76.5 3503.5 ROP MWD010 FT/H 6.15 928.3 189.739 6858 116.5 3545 First Reading For Entire File.... ..... .76.5 Last Reading For Entire File..... ......3545 File Trailer Service name...... ...... .STSLIB.002 Service Sub Level Name. . . Version Number....... ... .1.0.0 Date of Generation...... .06/04/12 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name....... ......STSLIB.003 Service Sub Level Name... Version Number.. ........ .1.0.0 Date of Generation...... .06/04/12 Maximum Physical Record. .65535 File Type........... .....LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPS FET RPX RPD RPM GR ROP $ 3 header data for each bit run in separate files. 2 .5000 START DEPTH 3496.5 3496.5 3496.5 3496.5 3496.5 3504.0 3545.5 STOP DEPTH 8046.0 8046.0 8046.0 8046.0 8046.0 8053.0 8090.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): 15-APR-05 Insite 66.37 Memory 8090.0 TOP LOG INTERVAL (FT): tit BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RES IS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type........ ..........0 Data Specification Block Type.....O Logging Direction............ .....Down Optical log depth units..... .... ..Feet Data Reference Point. .... ........ .Undefined Frame Spacing...... .... .......... .60 .1IN Max frames per record........ .....Undefined Absent value................ ......-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 3545.0 8090.0 .0 75.4 TOOL NUMBER 132477 66259 8.750 LSND 10.15 50.0 9.0 600 4.6 1.980 1.040 2.100 2.300 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD020 OHMM 4 1 68 4 2 RPM MWD020 OHMM 4 1 68 8 3 RPS MWD020 OHMM 4 1 68 12 4 RPX MWD020 OHMM 4 1 68 16 5 FET MWD020 HOUR 4 1 68 20 6 GR MWD020 API 4 1 68 24 7 ROP MWD020 FT/H 4 1 68 28 8 Name Service Unit DEPT FT Min 3496.5 Max 8090 Mean Nsam 5793.25 9188 . 73.0 145.4 73.0 73.0 First Reading 3496.5 Last Reading 8090 RPD MWD020 OHMM 0.4. 2000 17.9076 9100 .496.5 8046 RPM MWD020 OHMM 0.56 2000 5.62124 9100 3496.5 8046 RPS MWD020 OHMM 0.54 1728.24 3.89459 9100 3496.5 8046 RPX MWD020 OHMM 0.54 1874.06 3.95372 9100 3496.5 8046 FET MWD020 HOUR 0.14 53.19 1.23117 9100 3496.5 8046 GR MWD020 API 10.98 462.83 109.865 9099 3504 8053 ROP MWD020 FT/H 0.8 438.14 144.165 9090 3545.5 8090 First Reading For Entire File......... .3496.5 Last Reading For Entire File.......... .8090 File Trailer Service name......... ....STSLIB.003 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation...... .06/04/12 Maximum Physical Record. .65535 File Type... .... ........ .LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name... ......... .STSLIB.004 Service Sub Level Name. . . Version Number........ ...1.0.0 Date of Generation.. ... ..06/04/12 Maximum Physical Record..65535 File Type......... ..... ..LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE NPHI NCNT FCNT DRHO PEF RHOB RPM RPX RPD FET RPS GR ROP $ 4 header data for each bit run in separate files. 3 .5000 START DEPTH 8004.0 8004.0 8004.0 8019.0 8019.0 8019.0 8046.5 8046.5 8046.5 8046.5 8046.5 8053.5 8090.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): STOP DEPTH 8236.5 8236.5 8236.5 8252.5 8252.5 8252.5 8280.0 8280.0 8280.0 8280.0 8280.0 8273.0 8324.0 18-APR-05 Insite 66.37 Memory 8324.0 8090.0 . BOTTOM LOG INTERVAL (FT)~ BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR CTN EWR4 ALD $ BOTTOM) TOOL TYPE DUAL GAMMA RAY COMP THERMAL NEUTRON Electromag Resis. 4 Azimuth. Litho-Den # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type............. .....0 Data Specification Block Type.. ...0 Logging Direction.......... ..... ..Down Optical log depth units.. ........ .Feet Data Reference Point. ............ . Undefined Frame Spacing.......... ......... ..60 .1IN Max frames per record......... ....Undefined Absent value................ ......-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 8324.0 . 79.0 92.5 TOOL NUMBER 178513 100547 159439 183652 6.125 FLO-PRO 9.05 53.0 9.5 39000 5.2 .190 .130 .100 .250 72 .0 107.6 72.0 72.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD030 CNTS 4 1 68 4 2 NCNT MWD030 CNTS 4 1 68 8 3 RHOB MWD030 G/CM 4 1 68 12 4 DRHO MWD030 G/CM 4 1 68 16 5 RPD MWD030 OHMM 4 1 68 20 6 RPM MWD030 OHMM 4 1 68 24 7 RPS MWD030 OHMM 4 1 68 28 8 RPX MWD030 OHMM 4 1 68 32 9 FET MWD030 HOUR 4 1 68 36 10 GR MWD030 API 4 1 68 40 11 PEF MWD030 BARN 4 1 68 44 12 ROP MWD030 FT/H 4 1 68 48 13 ~ NPHI MWD030 PU-S . 1 68 52 14. First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 8004 8324 8164 641 8004 8324 FCNT MWD030 CNTS 203.69 1451. 97 506.958 466 8004 8236.5 NCNT MWD030 CNTS 18137.4 41205.8 25281.2 466 8004 8236.5 RHOB MWD030 G/CM 0.307 3.054 1.88199 468 8019 8252.5 DRHO MWD030 G/CM -4.899 0.639 -0.580521 468 8019 8252.5 RPD MWD030 OHMM 2.85 2000 360.24 468 8046.5 8280 RPM MWD030 OHMM 0.74 2000 192.528 468 8046.5 8280 RPS MWD030 OHMM 0.22 1594.6 9.99545 468 8046.5 8280 RPX MWD030 OHMM 0.2 1593.17 9.20658 468 8046.5 8280 FET MWD030 HOUR 0.37 57.19 11. 8628 468 8046.5 8280 GR MWD030 API 48.37 91.45 69.6797 440 8053.5 8273 PEF MWD030 BARN 1. 41 14.69 5.18735 468 8019 8252.5 ROP MWD030 FT/H 4.94 160.94 83.4054 468 8090.5 8324 NPHI MWD030 PU-S 13.38 44.36 28.4694 466 8004 8236.5 First Reading For Entire File... ...... .8004 Last Reading For Entire File.......... .8324 File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .06/04/12 Maximum Physical Record. .65535 File Type...... ......... .LO Next File Name. ......... .STSLIB.005 Physical EOF Tape Trailer Service name. ........... .LISTPE Date. . . . . . . . . . . . . . . . . . . . .06/04/12 Origin.................. .STS Tape Name......... ..... ..UNKNOWN Continuation Number..... .01 Next Tape Name.... ..... ..UNKNOWN Comments.......... ...... .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name....... ..... .LISTPE Date. . . . . . . . . . . . . . . . . . . . .06/04/12 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name. ......... . UNKNOWN Comments..... ........... .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File I "3 rt"a uxc.. f)QD -0;) d-. Sperry-Sun Dr~ing Services LIS Scan Utility . $Revision: 3 $ LisLib $Revision: 4 $ Wed Apr 12 13:44:27 2006 Reel Header Service name..... ....... .LISTPE Date. . . . . . . . . . . . . . . . . . . . .06/04/12 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name. .......... .....UNKNOWN Continuation Number......01 Previous Reel Name...... .UNKNOWN Comments........ ........ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name. ........ ....LISTPE Date. . . . . . . . . . . . . . . . . . . . .06/04/12 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name....... ........ .UNKNOWN Continuation Number..... .01 Previous Tape Name...... .UNKNOWN Comments............... ..STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPK-22 500292324900 B.P. Exploration (Alaska) Inc. Sperry Drilling Services 12-APR-06 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0003642743 R. FRENCH E. VAUGHN MWD RUN 2 MW0003642743 R. FRENCH D. GREEN MWD RUN 3 MW0003642743 C.A. DEMOSKI D. GREEN JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 4 MW0003642743 C.A. DEMOSKI D. GREEN # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 3 12N llE 3661 1987 62.45 28.20 # WELL CASING RECORD OPEN HOLE CASING DRILLERS u Ie... dD~ -O;;)~ 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING BIT S~ 12.250 8.750 6.125 (IN) SIZE (IN) 20.000 9.625 7.000 DEPTH (FT) 114.0 3535.0 8090.0 . # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELLBORE IS AN OPENHOLE SIDETRACK, EXITING MPK-22 PB1 AT 8200'MD/ 7100'TVD. 4. MWD RUNS 1-4 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). MWD RUNS 3 & 4 ALSO INCLUDED COMPENSATED THERMAL NEUTRON POROSITY (CTN), AZIMUTHAL LITHO-DENSITY (ALD), AND AT-BIT INCLINATION (ABI). 5. MWD DATA ARE CONSIDERED PDC PER E-MAIL RECEIVED FROM D. DORTCH (SAIC/BP) ON 21 MARCH 2006, QUOTING AUTHORIZATION FROM MIKIE WEEKS (BP GEOSCIENTIST) . 6. MWD RUNS 1-4 REPRESENT WELL MPK-22 WITH API#: 50-029-23249-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 8894'MD/7135'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE MATRIX, FIXED HOLE SIZE) . CTFA SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN) . SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN) . SNP2 = SMOOTHED NEAR-DETECTOR-ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN) . SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. ALDSLIDE = NON-ROTATED INTERVALS REFLECTING SENSOR DEPTHS. PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: 6.125" MUD WEIGHT: 9.0 PPG MUD SALINITY: 39000 PPM CHLORIDES FORMATION WATER SALINITY: 20000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSIT. 2.65 LITHOLOGY: SANDSTONE $ G/CC . File Header Service name...... ..... ..STSLIB.001 Service Sub Level Name... Version Number. ......... .1.0.0 Date of Generation..... ..06/04/12 Maximum Physical Record..65535 File Type............... .LO Previous File Name..... ..STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP RPX RPD FET RPM RPS NCNT NPHI FCNT RHOB PEF DRHO $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 76.5 116.5 165.0 165.0 165.0 165.0 165.0 8004.0 8004.0 8004.0 8094.0 8094.0 8094.0 STOP DEPTH 8842.5 8894.0 8849.5 8849.5 8849.5 8849.5 8849.5 8806.0 8806.0 8806.0 8822.0 8822.0 8822.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH ------ BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD $ # REMARKS: BIT RUN NO 1 2 3 4 MERGED MAIN PASS. $ MERGE TOP 76.5 3545.0 8090.0 8200.0 MERGE BASE 3545.0 8090.0 8200.0 8894.0 # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction.......... ..... ..Down Optical log depth units.......... .Feet Data Reference Point......... .....Undefined Frame Spacing............ ........ .60 .1IN Max frames per record............ .Undefined Absent value...... . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT FCNT MWD Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 CNTS 4 1 68 4 2 NCNT MWD CNTS . 1 68 8 3 . RHOB MWD G/CM 4 1 68 12 4 DRHO MWD G/CM 4 1 68 16 5 RPD MWD OHMM 4 1 68 20 6 RPM MWD OHMM 4 1 68 24 7 RPS MWD OHMM 4 1 68 28 8 RPX MWD OHMM 4 1 68 32 9 FET MWD HOUR 4 1 68 36 10 GR MWD API 4 1 68 40 11 PEF MWD BARN 4 1 68 44 12 ROP MWD FT/H 4 1 68 48 13 NPHI MWD PU-S 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 76.5 8894 4485.25 17636 76.5 8894 FCNT MWD CNTS 203.69 1408.97 582.854 1605 8004 8806 NCNT MWD CNTS 18137.4 42256.2 27833.5 1605 8004 8806 RHOB MWD G/CM 2.099 3.099 2.45072 1457 8094 8822 DRHO MWD G/CM -0.131 0.501 0.1198 1457 8094 8822 RPD MWD OHMM 0.18 2000 32.9453 17370 165 8849.5 RPM MWD OHMM 0.36 2000 21. 277 17370 165 8849.5 RPS MWD OHMM 0.22 2000 13.0101 17370 165 8849.5 RPX MWD OHMM 0.2 2000 10.5069 17370 165 8849.5 FET MWD HOUR 0.13 57.19 1.32299 17370 165 8849.5 GR MWD API 10.98 462.83 88.5944 17533 76.5 8842.5 PEF MWD BARN 1.37 7.37 2.60641 1457 8094 8822 ROP MWD FT/H 0.2 928.3 154.669 17556 116.5 8894 NPHI MWD PU-S 10.95 44.36 25.301 1605 8004 8806 First Reading For Entire File......... .76.5 Last Reading For Entire File.......... .8894 File Trailer Service name........ .....STSLIB.OOl Service Sub Level Name... Version Number....... ....1.0.0 Date of Generation... ....06/04/12 Maximum Physical Record..65535 File Type................ LO Next File Name....... ....STSLIB.002 Physical EOF File Header Service name........ .....STSLIB.002 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation..... ..06/04/12 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOl Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY 2 header data for each bit run in separate files. 1 .5000 VENDOR TOOL CODE GR ROP RPD RPX RPM RPS FET $ START .TH 76.5 116.5 165.0 165.0 165.0 165.0 165.0 STOP DEPTH 3503.5 3545.0 3496.0 3496.0 3496.0 3496.0 3496.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type... .... ........ ...0 Data Specification Block Type.. ...0 Logging Direction............. ....Down Optical log depth units...... .....Feet Data Reference Point............ ..Undefined Frame Spacing................... ..60 .1IN Max frames per record........... ..Undefined Absent value......... ... ......... .-999 Depth Units....................... . 10-APR-05 Insite 66.37 Memory 3545.0 222.0 3545.0 .0 3.3 TOOL NUMBER 124724 59672 12.250 114.0 SPUD MUD 10.50 90.0 8.0 700 8.8 3.000 2.120 2.700 2.600 60.0 87.8 62.0 62.0 Datum Specification Bloctltub-type...o . Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD010 OHMM 4 1 68 4 2 RPM MWD010 OHMM 4 1 68 8 3 RPS MWD010 OHMM 4 1 68 12 4 RPX MWD010 OHMM 4 1 68 16 5 FET MWD010 HOUR 4 1 68 20 6 GR MWD010 API 4 1 68 24 7 ROP MWD010 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 76.5 3545 1810.75 6938 76.5 3545 RPD MWD010 OHMM 0.18 2000 31. 4938 6663 165 3496 RPM MWD010 OHMM 0.36 2000 31. 4853 6663 165 3496 RPS MWD010 OHMM 0.27 2000 26.4356 6663 165 3496 RPX MWD010 OHMM 0.25 2000 20.2039 6663 165 3496 FET MWD010 HOUR 0.13 5.23 0.550383 6663 165 3496 GR MWD010 API 15.47 121.36 65.2466 6855 76.5 3503.5 ROP MWD010 FT/H 6.15 928.3 189.739 6858 116.5 3545 First Reading For Entire File......... .76.5 Last Reading For Entire File.......... .3545 File Trailer Service name........... ..STSLIB.002 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation..... ..06/04/12 Maximum Physical Record..65535 File Type.............. ..LO Next File Name...... ... ..STSLIB.003 Physical EOF File Header Service name... ......... .STSLIB.003 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .06/04/12 Maximum Physical Record. .65535 File Type............ ... .LO Previous File Name..... ..STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPM FET RPD RPX RPS GR 3 header data for each bit run in separate files. 2 .5000 START DEPTH 3496.5 3496.5 3496.5 3496.5 3496.5 3504.0 STOP DEPTH 8046.0 8046.0 8046.0 8046.0 8046.0 8053.0 ROP $ 3545.. 8090.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB!G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.............. ....0 Data Specification Block Type.....O Logging Direction........... ... ...Down Optical log depth units.... ..... ..Feet Data Reference Point............ ..Undefined Frame Spacing............. ....... .60 .1IN Max frames per record... ......... .Undefined Absent value........ ... .......... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . 15-APR-05 Insite 66.37 Memory 8090.0 3545.0 8090.0 .0 75.4 TOOL NUMBER 132477 66259 8.750 3535.0 LSND 10.15 50.0 9.0 600 4.6 1. 980 1.040 2.100 2.300 73.0 145.4 73.0 73.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD020 OHMM 4 1 68 4 2 RPM MWD020 OHMM 4 1 68 8 3 RPS MWD020 OHMM 4 1 68 12 4 RPX MWD020 OHMM . 1 68 16 5 . FET MWD020 HOUR 4 1 68 20 6 GR MWD020 API 4 1 68 24 7 ROP MWD020 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3496.5 8090 5793.25 9188 3496 . 5 8090 RPD MWD020 OHMM 0.47 2000 17.9076 9100 3496.5 8046 RPM MWD020 OHMM 0.56 2000 5.62124 9100 3496.5 8046 RPS MWD020 OHMM 0.54 1728.24 3.89459 9100 3496.5 8046 RPX MWD020 OHMM 0.54 1874.06 3.95372 9100 3496.5 8046 FET MWD020 HOUR 0.14 53.19 1.23117 9100 3496.5 8046 GR MWD020 API 10.98 462.83 109.865 9099 3504 8053 ROP MWD020 FT/H 0.8 438.14 144.165 9090 3545.5 8090 First Reading For Entire File......... .3496.5 Last Reading For Entire File...... .... .8090 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .06/04/12 Maximum Physical Record. .65535 File Type... ............ .LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name... version Number.... ...... .1.0.0 Date of Generation...... .06/04/12 Maximum Physical Record. .65535 File Type.. ............. .LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE NPHI NCNT FCNT RPM FET RPX RPS RPD GR ROP PEF DRHO RHOB 4 header data for each bit run in separate files. 3 .5000 START DEPTH 8004.0 8004.0 8004.0 8046.5 8046.5 8046.5 8046.5 8046.5 8053.5 8090.5 8094.0 8094.0 8094.0 STOP DEPTH 8134.0 8134.0 8134.0 8200.0 8200.0 8200.0 8200.0 8200.0 8200.0 8200.0 8130.5 8130.5 8130.5 $ . # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR CTN EWR4 ALD $ BOTTOM) TOOL TYPE DUAL GAMMA RAY COMP THERMAL NEUTRON Electromag Resis. 4 Azimuth. Litho-Den # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type............ ... ...0 Data Specification Block Type.....O Logging Direction... ...... ...... ..Down Optical log depth units.......... .Feet Data Reference Point.......... ....Undefined Frame Spacing................ .....60 .1IN Max frames per record.... ....... ..Undefined Absent value.......... ........... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT FCNT MWD030 NCNT MWD030 Size 4 4 4 Nsam Rep 1 68 1 68 1 68 Code Units FT CNTS CNTS . 18-APR-05 Insite 66.37 Memory 8200.0 8090.0 8200.0 79.0 92.5 TOOL NUMBER 178513 100547 159439 183652 6.125 8090.0 FLO-PRO 9.05 53.0 9.5 39000 5.2 .190 .130 .100 .250 72.0 107.6 72.0 72.0 Offset o 4 8 Channel 1 2 3 RHOB MWD030 G/CM . 1 68 12 4 . DRHO MWD030 G/CM 4 1 68 16 5 RPD MWD030 OHMM 4 1 68 20 6 RPM MWD030 OHMM 4 1 68 24 7 RPS MWD030 OHMM 4 1 68 28 8 RPX MWD030 OHMM 4 1 68 32 9 FET MWD030 HOUR 4 1 68 36 10 GR MWD030 API 4 1 68 40 11 PEF MWD030 BARN 4 1 68 44 12 ROP MWD030 FT/H 4 1 68 48 13 NPHI MWD030 PU-S 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 8004 8200 8102 393 8004 8200 FCNT MWD030 CNTS 203.69 634.28 362.986 261 8004 8134 NCNT MWD030 CNTS 18137.4 30215.5 22096.2 261 8004 8134 RHOB MWD030 G/CM 2.176 2.523 2.36197 74 8094 8130.5 DRHO MWD030 G/CM -0.005 0.383 0.0720405 74 8094 8130.5 RPD MWD030 OHMM 2.85 2000 544.054 308 8046.5 8200 RPM MWD030 OHMM 0.74 2000 289.975 308 8046.5 8200 RPS MWD030 OHMM 0.22 1594.6 13 . 183 308 8046.5 8200 RPX MWD030 OHMM 0.2 1593.17 12.1811 308 8046.5 8200 FET MWD030 HOUR 0.75 57.19 17.4208 308 8046.5 8200 GR MWD030 API 48.37 91. 45 69.7203 294 8053.5 8200 PEF MWD030 BARN 1. 57 2.57 1.80365 74 8094 8130.5 ROP MWD030 FT/H 4.94 155.18 61.7879 220 8090.5 8200 NPHI MWD030 PU-S 22.28 44.36 33.1388 261 8004 8134 First Reading For Entire File......... .8004 Last Reading For Entire File.......... .8200 File Trailer Service name........ .....STSLIB.004 Service Sub Level Name... Version Number..... .... ..1.0.0 Date of Generation..... ..06/04/12 Maximum Physical Record..65535 File Type............... .LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .06/04/12 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE 5 header data for each bit run in separate files. 4 .5000 START DEPTH STOP DEPTH DRHO 8131.. 8822.0 . RHOB 8131. 0 8822.0 PEF 8131. 0 8822.0 NPHI 8134.5 8806.0 NCNT 8134.5 8806.0 FCNT 8134.5 8806.0 GR 8200.5 8842.5 RPM 8200.5 8849.5 RPD 8200.5 8849.5 RPX 8200.5 8849.5 FET 8200.5 8849.5 RPS 8200.5 8849.5 ROP 8200.5 8894.0 $ # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR CTN EWR4 ALD $ BOTTOM) TOOL TYPE DUAL GAMMA RAY COMP THERMAL NEUTRON Electromag Resis. 4 Azimuth. Litho-Den # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type........... .......0 Data Specification Block Type.....O 19-APR-05 Insite 66.37 Memory 8894.0 8200.0 8894.0 83.1 91. 8 TOOL NUMBER 178513 100547 159439 183652 6.125 8090.0 Flo-pro 9.10 50.0 9.0 33000 4.8 .190 .120 .100 .250 72 .0 118.0 72.0 72.0 L . ., . ogglng Dlrectlon........ ........ . Down Optical log depth units.......... .Feet Data Reference Point. ........... ..Undefined Frame Spacing........... ......... .60 .1IN Max frames per record.... ....... ..Undefined Absent value............. ....... ..-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . Service Order Units FT CNTS CNTS G/CM G/CM OHMM OHMM OHMM OHMM HOUR API BARN FT/H PU-S Size 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Nsam Rep 1 68 1 68 1 68 1 68 1 68 1 68 1 68 1 68 1 68 1 68 1 68 1 68 1 68 1 68 Code Offset o 4 8 12 16 20 24 28 32 36 40 44 48 52 Channel 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Name DEPT FCNT NCNT RHOB DRHO RPD RPM RPS RPX FET GR PEF ROP NPHI MWD040 MWD040 MWD040 MWD040 MWD040 MWD040 MWD040 MWD040 MWD040 MWD040 MWD040 MWD040 MWD040 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 8131 8894 8512.5 1527 8131 8894 FCNT MWD040 CNTS 306.21 1408.97 625.552 1344 8134.5 8806 NCNT MWD040 CNTS 19089.6 42256.2 28947.7 1344 8134.5 8806 RHOB MWD040 G/CM 2.099 3.099 2.45547 1383 8131 8822 DRHO MWD040 G/CM -0.131 0.501 0.122355 1383 8131 8822 RPD MWD040 OHMM 2.59 1751. 64 24.5491 1299 8200.5 8849.5 RPM MWD040 OHMM 2.51 149.47 14.8798 1299 8200.5 8849.5 RPS MWD040 OHMM 2.29 35.6 7.96293 1299 8200.5 8849.5 RPX MWD040 OHMM 1. 88 24.25 6.27794 1299 8200.5 8849.5 FET MWD040 HOUR 0.69 12.12 2.11238 1299 8200.5 8849.5 GR MWD040 API 45.2 81. 87 66.8508 1285 8200.5 8842.5 PEF MWD040 BARN 1.37 7.37 2.64936 1383 8131 8822 ROP MWD040 FT/H 0.2 523.94 64.9093 1388 8200.5 8894 NPHI MWD040 PU-S 10.95 31.71 23.7789 1344 8134.5 8806 First Reading For Entire File.... ..... .8131 Last Reading For Entire File..... .... ..8894 File Trailer Service name............ .STSLIB.005 Service Sub Level Name... Version Number... ..... ...1.0.0 Date of Generation...... .06/04/12 Maximum Physical Record. .65535 File Type.. ............. .LO Next File Name...... .....STSLIB.006 Physical EOF Tape Trailer Service name.......... ...LISTPE Date. . . . . . . . . . . . . . . . . . . . .06/04/12 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name.... ........... . UNKNOWN Continuation Number... ...01 Next Tape Name......... .~KNOWN 4IÞ Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .06/04/12 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File