HomeMy WebLinkAbout205-202RBDMS JSB 040423
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~Q~- p~,0 0~ Well History File Identifier
Organizing (done) ~ Two-sided III VIII) II III II III ^ Rescan Needed III II'lll II II III III
RES AN DIGITAL DATA OVERSIZED (Scannable)
Color Items: Diskettes, No.' ^ Maps:
^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by
a Large Scanner
^ Poor Quality Originals:
OVERSIZED (Non-Scannable)
^ Other:
^ Logs of various kinds:
NOTES: ^ Other.:
BY: Maria Date: /s/
ProjectProofing I lli lll lll ll ll VII I
BY: Maria Date: /s/
Scanning Preparation _~ x 30 = + ~ c3 =TOTAL PAGES
/
/ (Count does not include cover sheet)
BY: Maria Date: /n
~. ~ ~Q /s/ V r L
Production Scanning
Stage 7 Page Count from Scanned File: ~ (Count does include cover sheet)
Page Count Matches Number in Scanning Pr partition: YES _
BY: Maria Date: ~I ~Cj O
Stage 7 If NO in stage 1, page(s) discrepancies were found: YES
BY: Maria Date:
Scanning is complete at this point unless rescanning is required.
NO
/s/
NO
"hiiuuuimuii
ReScanned
BY: Maria
Date:
/s/
Comments about this file:
a~,~„~~~~ iuiuuiiiiimii
10/6/2005 Well History File Cover Page.doc
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
April 21, 2010 ~ ~ `)~ i`,
};
pi;~ ~~
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of Northstar
Dear Mr. Maunder,
•
by
~EC~~~l~~`~
~1AY ~ ~ ~01[~
~ncfi
~~
Enclosed please find a spreadsheet with a list of wells from Northstar that were treated
with corrosion inhibitor in the surface casing by conductor annulus. The corrosion
inhibitor is engineered to prevent water from entering the annular space and causing
external corrosion that could result in a surface casing leak to atmosphere. The
attached spreadsheet represents the well name, top of cement depth prior to filling and
volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Jerry
Murphy, at 659-5102.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
I~
Date
Northstar
a/~n/~n 1 n
Well Name
PTD #
API #
Initial top of
cement
Vol. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitor/
sealant date
ft bbls ft na al
NS05 2050090 50029232440000 1.7 na 1.7 na 10 4/30/2009
NS06 2021010 50029230880000 0.5 na 0.5 na 1.7 4/30/2009
NS07 2020770 50029230810000 1.1 na 1.1 na 5.3 4/30/2009
NS08 2020210 50029230680000 0.75 na 0.75 na 3.6 4/30/2009
NS09 2012190 50029230520000 1.2 na 1.2 na 3.4 4/30/2009
NS10 2001820 50029229850000 0.25 na 0.25 na 3 4/30/2009
NS11 2060360 50029233030000 0.75 na 0.75 na 5.1 5/1/2009
NS12 2021100 50029230910000 1.2 na 1.2 na 3.2 5/1/2009
NS13 2010860 50029230170000 1.7 na 1.7 na 6.8 5/1/2009
NS14A 2052020 50029230260100 0.9 na 0.9 na 2.8 5/1/2009
NS16A 2061410 50029230960100 1.3 na 1.3 na 5.8 5/1/2009
NS17 2021690 50029231130000 1.2 na 1.2 na 2.6 5/1/2009
NS18 2021410 50029231020000 1.5 na 1.5 na 7.3 5/1/2009
NS19 2022070 50029231220000 1.5 na 1.5 na 10.2 5/2/2009
NS20 2021880 50029231180000 1.4 na 1.4 na 8.5 5/2/2009
NS21 2022180 50029231260000 1.7 na 1.7 na 4.3 5/2/2009
NS22 2022230 50029231280000 1.6 na 1.6 na 10.2 5/2/2009
NS23 2030500 50029231460000 0.75 na 0.75 na 3 5/2/2009
NS24 2021640 50029231110000 0.75 na 0.75 na 2.6 5/2/2009
NS25 2031660 50029231810000 na na 2.6 5/2/2009
NS-26 2002110 50029229960000 at surface na na na na na
NS27 2010270 50029230030000 0.6 na 0.6 na 1 5/3/2009
NS28 2050160 50029232480000 1.5 na 1.5 na 8.1 5/3/2009
NS30 2052070 50029232930000 0 na 0 na 4.3 5/3/2009
NS32 2031580 50029231790000 na na 1.7 5/3/2009
NS33A 2081890 50029233250100 Sealed conductor na na na na
NS34A 2080170 50029233010100 0 na 0 na 2.2 5/3/2009
'Not measured due to rig proximity.
• •
by
BP Exploration (Alaska) Inc. Y '
Attn: Well Integrity Coordinator, PRB-20 >:~
Post Office Box 196612
Anchorage, Alaska 99519-6612
a~ 1~ 3
~ i .~ ,:~,
May 26, 2009 ~~~ ~~~~
I~~~~ CAI ~~~ ~;~,i~sio~
~~~~~r~
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission ~ ~>~ ~~ ~--
333 West 7th Avenue ~-. `' ~.
Anchorage, Alaska 99501 ~~
Subject: Corrosion Inhibitor Treatments of Northstar 1 `Y
Dear Mr. Maunder,
Enclosed please find a spreadsheet with a list of wells from Northstar that were treated
with corrosion inhibitor in the surface casing by conductor annulus. The corrosion
inhibitor is engineered to prevent water from entering the annular space and causing
external corrosion that could result in a surface casing leak to atmosphere. The
attached spreadsheet represents the well name, top of cement depth prior to filling and
volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Anna Dube,
at 659-5102.
Sincerely,
~-~- G~
Andrea Hughes
BPXA, Well Integrity Coordinator
;:>~ ~°4a~i'~~ . << I~, t, r rriid
r
•
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
~, r
~-~`
Date
Northstar
5/26/2009
Well Name
PTD #
Initial top of
cement
Vol. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitor/
sealant date
ft bbls ft na al
NS05 2050090 1.7 na 1.7 na 10 4/30/2009
NS06 2021010 0.5 na 0.5 na 1.7 4/30/2009
NS07 2020770 1.1 na 1.1 na 5.3 4/30/2009
NS08 2020210 0.75 na 0.75 na 3.6 4/30/2009
NS09 2012190 1.2 na 1.2 na 3.4 4/30/2009
NS10 2001820 0.25 na 0.25 na 3 4/30/2009
NS11 2060360 0.75 na 0.75 na 5.1 5/1/2009
NS12 2021100 1.2 na 1.2 na 3.2 5/1/2009
NS13 2010860 1.7 na 1.7 na 6.8 5/1/2009
NS14 A 2052020 0.9 na 0.9 na 2.8 5/1/2009
NS16 2061410 1.3 na 1.3 na 5.8 5/1/2009
NS17 2021690 1.2 na 1.2 na 2.6 5/1/2009
NS18 2021410 1.5 na 1.5 na 7.3 5/1/2009
NS19 2022070 1.5 na 1.5 na 10.2 5/2/2009
NS20 2021880 1.4 na 1.4 na 8.5 5/2/2009
NS21 2022180 1.7 na 1.7 na 4.3 5/2/2009
NS22 2022230 1.6 na 1.6 na 10.2 5/2/2009
NS23 2030500 0.75 na 0.75 na 3 5/2/2009
NS24 2021640 0.75 na 0.75 na 2.6 5/2/2009
NS25 2031660 na * na 2.6 5/2/2009
NS27 2010270 0.6 na 0.6 na 1 5/3/2009
NS28 2050160 1.5 na 1.5 na 8.1 5/3/2009
NS30 2052070 0 na 0 na 4.3 5/3/2009
NS32 2031580 * na * na 1.7 5/3/2009
NS34 2080170 0 na 0 na 2.2 5/3!2009
*Not measured due to rig proximity.
L JUN 0 1 1009
~~ ~~
DATA SUBMITTAL COMPLIANCE REPORT
6/19/2008
Permit to Drill 2052020 Well Name/No. NORTHSTAR UNIT NS-14A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23026-01-00
MD 14230 TVD 11146 Completion Date 5/21/2006 Completion Status 1-OIL Current Status 1-OIL UIC N
REQUIRED INFORMATION
Mud Log No Samples No Directional Survey Yes
DATA INFORMATION
Types Electric or Other Logs Run: DIR, GR-CCL PDC, PWD, RES, DEN, NEU, MWD, MAD PASS (data taken from Logs Portion of Master Well Data Maint
Well Log Information:
Log/ Electr
Data Digital Dataset Log Log Run Interval OH I
Ty Med/Frmt Number Name Scale Media No Start Stop CH Received Comments
GLD D Asc Directional Survey
~og Gamma Ray 5 Blu
i~~ ~~
J~9
13975 Induction/Resistivity 25 Blu
Ii C Pds 13975 Induction/Resistivity 25
o 13975 Induction/Resistivit
25 Bl
g y
u
C Pds 13975/I
ctio
/Resi
ti
it
d
u
n
v
n
s
y
i
C Lis 13975 LIS Verification
pt Directional Survey
Well Cores/Sampl es Information:
0 14230 Open 11/15/2006
9180 12240 Case 8/23/2006 Depth Control Log GR /
CCL 20-January-2006
200 14230 Open 7/5/2006 MDL Recored Mode FINAL
Print Scale1:600 & 1:240 8-
Jan-2006
200 14230 Open 7/5/2006 MDL Recored Mode FINAL
Print Scale1:600 & 1:240 8-
Jan-2006
200 14230 Open 7/5/2006 TVD Recorded Mode
FINAL PRINT Scale 1:600
& 1:240 8-Jan-2006
200 14230 Open 7/5/2006 TVD Recorded Mode
FINAL PRINT Scale 1:600
& 1:240 8-Jan-2006
305 14251 Open 7/5/2006 ROP, GR, DRHO, NPHI
0 14230. Open 11/15/2006
Sample
Interval Set
Name Start Stop Sent Received Number Comments
DATA SUBMITTAL COMPLIANCE REPORT
6/19/2008
Permit to Drill 2052020 Well Name/No. NORTHSTAR UNIT NS-14A Operator BP EXPLORATION (ALASKA) INC
MD 14230 TVD 11146 Completion Date 5/21/2006 Completion Status 1-OIL Current Status 1-OIL
ADDITIONAL INFORMATION
Well Cored? `~ Daily History Received? ~/ N
Chips Received? ~CLQ4-~- Formation Tops ~ N
Analysis W-tQ~
Received?
API No. 50-029-23026-01-00
UIC N
Comments:
Compliance Reviewed By:
Date:
r 1
u
~.:
.,
~.:
^~~ .i:'.
Date: 11-14-2006
Transmittal Number:92860
BPXA WELL DATA TRANSMITTAL
Enclosed are the materials listed below. If you have any questions, please contact me in the PDC
at 564-4091.
SW Name Date Contractor Lo Run o De th Bottom De th Lo T e
NS14A 01-30-2006 SCH DIRECTIONAL SURVEY
S~
Please Sign and Return one copy oft is transmittal.
Thank You,
Andy Farmer
Petrotechnical Data Center
Attn: Doug Chromanski
Howard Okland
Kristin Dirks
Ignacio Herrera
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 99519-6612
o2c~ ~~ ~..~ ~.
Date: 08-22-2006
Transmittal Number:92819
BPXA WELL DATA TRANSMITTAL
Enclosed are the materials listed below. If you have any questions, please contact me in the PDC
~r Stid_d(1Q 1
aos-zoo
SW Name Date Contractor Lo Run To De th Bottom De th Lo T e
NS08 03-28-2006 SCH PERF RECORD
NS08 06-01-2006 SCH PERF RECORD
NS14A 01-20-2006 SCH DEPTH CONTROL
NS16 05-05-2006 SCH PRODUCTION PROFILE
NS31
06-05-2005
SCH PERF RECORD W ITH
GAMMA RAY
NS30 04-15-2006 SCH JEWELRY LOG
NS30 04-02-2006 SCH JEWELRY LOG
NS30
04-14-2006
SCH PERF RECORD WITH
GAMMA RAY
NS19 05-15-2006 SCH PERF RECORD
Plea e ign and Return one copy of this transmittal.
Thank You,
Andy Farmer
Petrotechnical Data Center
Attn: Cheryl Ploegstra
Howard Okland
Tim Ryherd
Ignacio Herrera
Doug Chromanski
.~
~~:~; -,
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 99519-661?
E~EIVEC}
STATE OF ALASKA JUL 1 1 2006
ALASK~IL AND GAS CONSERVATION COM lSSION
WELL COMPLETION OR RECOMPLETION REPORT AND LO~~~a Osl & Gas Cons. ComnSSiI~CE
Anchorage
1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG
zoaACZS.,os zoaa,czs.,,o
^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1b. Wel! Class:
®Development ^ Exploratory
^ Stratigraphic ^ Service
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.
5/21/2006 12. Permit to Drill Number
205-202
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
1/10/2006 13. API Number
50-029-23026-01-00
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
1/29/2006 14. Well Name and Number:
NS14A
1179
FEL, SEC. 11, T13N, R13E, UM
FSL, 644
Top of Productive Horizon:
3056' FSL, 4548' FEL, SEC. 11, T13N, R13E, UM
8. KB Elevation (ft):
55.51'
15. Field /Pool(s):
Northstar Unit
Total Depth:
2802 FSL, 2960 FEL, SEC. 11, T13N, R13E, UM 9. Plug Back Depth (MD+TVD)
14188 + 11145 Ft
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 659831 y- 6030952 Zone- ASP4 10. Total Depth (MD+TVD)
14230 + 11146
Ft 16. Property Designation:
ADL 312799
TPI: x- 655886 y- 6032745 Zone- ASP4
Total Depth: x- 657479 y- 6032525 Zone- ASP4 11. Depth where SSSV set
1027' MD 17. Land Use Permit:
LO-N96-006
18. Directional Survey ®Yes ^ No 19. Water depth, if offshore
39' MSL 20. Thickness of Permafrost
1545' (Approx.)
21. Logs Run:
DIR , GR-CCL PDC , PWD , RES ,DEN , NEU , MWD , LWD ,MAD PASS
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MO SETTING DEPTH TVD HOLE AMOUNT
.SIZE WT. PER FT. GRADE TOP BOTTOM ': TOP BOTTOM SIZE CEMENTING RECORD PULLED
20" 169# X-56 Surface 202' Surface 202' 20" Driven
13-3/8" 68# L-80 44' 3296' 44' 3208' 16" 633 sx PF 'L' 166 sx Class 'G'
9-518" 47# L-80 43' 43' 8677' 12-1/4" 6652 sx Econolite 487 sx Class'G'
7" 26# L-80 10028" 12383' 8551' 10795' 8~1-r~xs-vz" 550 sx Class 'G'
4-1l2" 12.6# 13Cr80 12250' 14229' 10673' 11146' 6-1/8" 271 sx Class 'G'
23. Perforations open to Production (MD + TVD of Top and 24. TUBING RECORD
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD
2-7/8" Gun Diameter, 6 SPF 4-1/2", 12.6#, 13Cr80 12252' 12204'
MD TVD MD TVD
13190' - 14140' 11148' - 11145' 25• ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 242 Bbls of Diesel
26. PRODUCTION TEST
Date First Production:
June 21, 2006 Method of Operation (Flowing, Gas Lift, etc.):
Flowing
Date of Test
6/20/2006 Hours Tested
4 PRODUCTION FOR
TEST PERIOD AIL-BBL
133 GAS-MCF
450 WATER-BBL
601 CHOKE SIZE
50 GAS-OIL RATIO
3401
Flow Tubing
Press. 836 Casing Pressure CALCULATED
Z4-HOUR RATE..' OIL-BBL
795 GAS-MCF
2702 WATER-BBL
3605 OIL GRAVITY-API (CORK)
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Sub//~~mit core chips; if none, state "none".
~F,/l. ,n i . 9v? ~ /
Non ~ S ~~ ,)Ul, ~ ~ Z~U6/ ~~ ~ru~0~1 /~1$~ •rroG~gG r~7 ~vd
V Iii
Form 10-407 Revised 12/2003 ~ ~ ~ NTINUED ON REVERSE SIDE /.~
28. GEOLOGIC MARKE 29. ORNWTION TESTS
Include and briefly summarize test results. List intervals tested,
NnMe MD TVD and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Kuparuk C 10462' 8930' None
Top of Miluveach 10788' 9250'
Top of Kingak 11303' 9761'
Top of Sag River 12336' 10752'
Top of Shublik - 90 12437' 10843'
Top of Ivishak 12540' 10930'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys and aLeak-Off Test Summary.
31. I hereby certify that the fore oing is true and rrect to the best of my knowledge.
1
Signed S dr~ a ~~ Technical Assistant Date ~~ -' ~ t'
NS14A 205-202 Prepared ByNameMumber: Sondra Stewman, 564-4750
Drilling Engineer: Dave Johnson, 564-4171
Well Number Permit No. / A royal No.
INSTRUCTIONS
GeNew-~: This form is designed for submitting a complete and correct well completion report and iog on all types of lands and leases in
Alaska.
IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
IreM 4b: TPI (Top of Producing Interval).
IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in
other spaces on this form and in any attachments.
IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
IreM 20: True vertical thickness.
IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
IreM 27: If no cores taken, indicate "None".
IreM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003 Submit Original Only
BP EXPLORATION
Operations Summary Report
Legal Well Name: NS14
Common Well Name: NS14
Event Name: REENTER+COMPLETE
Contractor Name: NABOBS ALASKA DRILLING I
Rig Name: NABOBS 33E
Date ~ From - To Hours Task ` Code ~ NPT
1 /3/2006
1 /4/2006
1 /5/2006
03:00 - 06:00 3.00 MOB P
06:00 - 12:00 6.00 MOB P
12:00 - 13:00 1.00 MOB P
13:00 - 16:00 3.00 KILL P
16:00 - 18:00 2.00 KILL P
18:00 - 19:00 1.00 KILL P
19:00 - 20:00 1.00 KILL P
20:00 - 22:00 2.00 KILL P
22:00 - 00:00 2.00 KILL P
00:00 - 03:00 3.00 KILL P
02:30 - 05:00 2.50 KILL P
05:00 - 08:30 3.50 KILL P
08:30 - 09:30 I 1.001 BOPSUp P
09:30 - 15:00 I 5.501 BOPSUFi P
15:00 - 22:30 I 7.50 I BOPSUR P
22:30 - 23:00 0.50 BOPSU P
23:00 - 00:00 1.00 BOPSU P
00:00 - 01:00 1.00 BOPSU P
01:00 - 04:00 3.00 BOPSU N
04:00 - 05:00 1.00 BOPSUFj N
05:00 - 12:00 7.00 BOPSU~{ P
12:00 - 15:00 I 3.001 BOPSUFf N
Start: 12/28/2005
Rig Release: 5/21/2006
Rig Number: 33E
Page 1 of 17
Spud Date: 1 /8/2002
End:
Phase Description of Operations
PRE Prep rig for move to NS-14, Lay mats & herculite
PRE PJSM & ATP with all personnel involved with rig move
Move rig from NS-10 to NS-14
PRE Clean area after rig move
DECOMP Accept rig @ 13:00 hrs on 1/3/2006
Place tree stand in cellar, clean cellar area
DECOMP RU lines to tubing & tA, prepare to circulate out FP
DECOMP Pull BPV
DECOMP PJSM, Review plans to circulate out FP
Discuss hazards associated with above tasks
DECOMP Reverse circulate 45 bbls FP diesel from tubing @ 1 BPM 150
psi
Trip tank full of diesel
DECOMP Connect & test injection line from G&I to NS-32 disposal well
DECOMP Transfer diesel from trip tank to G&I for disposal
Reverse circulate to trip tank 61 Bbls FP diesel from tubing w/
sea water Q 1.3 BPM
(total FP from Tbg 106 bbls)
DECOMP Circulate 220 Bbls FP diesel from IA w/ sea water ~ 1.3 BPM
DECOMP Circulate well bore w/sea water C 6 BPM 630 psia
Circulate Surface to Surface 757 Bbls
DECOMP Monitor wellbore, well static
Install BPV, test from below to 500 psia
DECOMP Bleed control line, ND Tree
Terminate control line & fiber optic line
DECOMP NU BOPS, choke & kill lines, accumulator hoses, riser & turn
buckles
DECOMP Pull BPV, Install TWC
DECOMP MU 5.5" test joint, safety valves & x-overs
DECOMP MU 5.5" test joint, X-Os & BOP test equipment
RREP DECOMP Test ROPE per AOGCC regs & BP policy - 250 psi low, 5000
psi high. BOPE test witnessed by Tool Pushers
Mark Ashley & Chris Page, WSLs Mike Dinger & Richard
Watkins. Witness of BOPE test waived by AOGCC Rep
Chuck Sheve
Test BOPE w/5.5" test joint 250/5000 psi (upper pipe rams),
Test failed, Repaired leaks on drilling spool, packing gland
nuts, #6 valve on choke manifold & test joint x-o sub, Move to
testing lower pipe rams, Test failed
RREP DECOMP RD test joint, change out TWC, RU test joint
DECOMP Test ROPE w/5.5" & 4.5" test joints, Test annular to 250/3500
- test ok, Test all other equipment to 250/5000.
R/D test jt
RREP DECOMP R/U & test lower IBOP & blind shear rams. Cycled IBOP
several times before attaining good high test.
15:00 - 16:00 1.00 BOPSU P DECOMP B/D top drive & R/D testing equip't.
16:00 - 19:00 3.00 PULL P DECOMP RU to LD 5.5" tubing, Change bails & elevators, Pull TWC, MU
landing joint, Back out hanger lock down pins
19:00 - 20:30 1.50 PULL P DECOMP Pull hanger from wellhead, Tbg hanger pulled free @ 280K,
String wt 235K, Blocks weigh 70K
Work hanger through BOP stack
Printed: 5/22/2006 11:56:32 AM
BP EXPLORATION
Operations Summary Report
Phase I Description of Operations
DECOMP Circulate through choke @ 6 BPM 130 psi, surface to surface,
shut down monitor well, well static
Circulate down flowline ~ 12 BPM 460 psi
DECOMP Circulate down flowline @ 500 GPM 460 psi, Pump 2X surface
to surface, Pump high vis pill at beginning of each surface to
surface circulation, Monitor well, well static
DECOMP LD landing joint & tbg hanger
DECOMP Level rig, raise & shim VLE side
DECOMP RU equipment to LD 5.5" & 4.5" tubing & spool control lines &
fiber optics cable.
DECOMP PJSM for UD tubing.
DECOMP LD 144 jts of 5.5", 17#, 13Cr-80 Fox tubing spooling up control
lines & fiber optics cable.
DECOMP Band & remove fiber optic line from spool
DECOMP LD 15 jts of 5.5", 17#, 13Cr-80 Fox tubing spooling up fiber
optic cable.
DECOMP LD 64 jts 5.5", 17#, 13Cr-80 Fox tubing spooling up fiber optics
cable.
DECOMP RD 5.5" tubing handling equipment, RU 4.5" tubing handling
equipment
DECOMP LD 40 jts 4.5", 12.6#, 13Cr-80 Vam Ace tubing spooling up
fiber optics cable
LD 4.5" cut joint, cut joint length 5.08, clean uniform cut, no
tearing
Total Tubing Laid Down: 233 jts of 5.5", 17#, 13Cr-80 Fox
tubing
Legal Well Name: NS14
Common Well Name: NS14 Spud Date: 1/8/2002
Event Name: REENTER+COMPLETE Start: 12/28/2005 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/21/2006
Rig Name: NABOBS 33E Rig Number: 33E
Date From - To Hours Task Code NPT
1/5/2006 20:30 - 00:00 3.50 PULL P
1/6/2006 100:00 - 02:30 I 2.501 PULL I P
02:30 - 03:30 1.00 PULL P
03:30 - 05:30 2.00 PULL P
05:30 - 07:00 1.50 PULL P
07:00 - 07:30 0.50 PULL P
07:30 - 21;30 14.00 PULL P
21:30- 22:30 1.00 PULL P
22:30 - 00:00 1.50 PULL P
1/7/2006 100:00 - 07:00 I 7.001 PULL I P
1 /8/2006
07:00 - 07:30 I 0.501 PULL 1 P
07:30 - 12:00 4.50 PULL P
12:00 - 14:30 2.50 PULL P
14:30 - 15:00 0.50 PULL P
15:00 - 16:30 1.50 STWHIP P
16:30 - 20:00 3.50 STWHIP P
20:00 - 23:30 I 3.501 STWHIPI P
23:30 - 00:00
00:00 - 01:30
01:30 - 03:00
03:00 - 04:00
04:00 - 04:30
04:30 - 05:00
05:00 - 06:00
06:00 - 06:30
06:30 - 08:30
08:30 - 20:00
0.50 STWHIP P
1.50 STWHIP P
1.50 STWHIP P
1.00 STWHIP P
0.50 STWHIP P
0.50 STWHIP P
1.00 STWHIP P
0.50 STWHIP P
2.00 STWHIP P
11.50 STWHIP P
20:00 - 22:30
2.501 STWHIPIP
Page 2 of 17
40 jts of 4.5", 12.6#, 13Cr-80 Vam
Ace tubing
1 cut joint 4.5", 12.6#, 13Cr-80
Vam Ace tubing Length 5.08'
DECOMP RD tubing handling equipment, change out bails & elevators,
clear & clean rig floor
Clear pipe shed of 5.5" & 4.5" tubing, NORM test tree, adaptor
flange, hanger and tubing.
DECOMP Install wear bushing
WEXIT RU E-line equipment
WEXIT Run 8.525 Gauge ring, junk basket, CCL & GR to 10,414
No tight spots, no recovery in junk basket
WEXIT MU Halliburton BP, RIH, correlate GR &CCL, Set BP ~
10,211', 9.625 casing collar @ 10,217'
Btm of BP @ 10,214'
WEXIT RD E-line equipment
WEXIT Clear rig floor, move whipstock & BHA components to rig floor
WEXIT MU BHA, mills, MWD, float sub & XOs &RIH
WEXIT PU 21 jts 5" HWDP, RIH
WEXIT Shallow test MWD ~ 500 GPM 425 psi, Test OK
WEXIT POH w/HWDP
WEXIT PU whipstock & MU to mill assembly &RIH
WEXIT Service rig, lubricate top drive
WEXIT PU 9 - 6.5" spiral drill collars &RIH
WEXIT TIH w/ whipstock, mill assembly, drill collars, HWDP & 5" DP.
Running speed 2 minutes per stand.
WEXIT Orient & Set whipstock assembly on bridge plug ~ 10,202'
Printed: 5/22/2006 11:56:32 AM
BP EXPLORATION
(~~~rati~ns ~ura~m~ry f~~p~r~t
Legal Well Name: NS14
Common Well Name: NS14
Event Name: REENTER+COMPLETE
Contractor Name: NABOBS ALASKA DRILLING
Rig Name: NABOBS 33E
Date From - To ~ Hours Task ~ Code NPT
__ _ ----~-- - - - - '~ - ---~----1~ ~
1/8/2006 120:00 - 22:30 ( 2.501 STWHIPI P
Start: 12/28/2005
Rig Release: 5/21/2006
Rig Number: 33E
I
Page 3 of 17
Spud Data: 1/8/2002
End:
Phase Descri tion f C
WEXIT
X22:30-23:30 ~ 1.00 STWHIP P ( WEXIT
23:30 - 00:00 I 0.50 STWHIP P WEXIT
1/9/2006 100:00 - 05:30 ~ 5.50 STWHIP I P LNR1
05:30 - 09:00 I 3.501 STWHIPI P I I LNR1
1 /10/2006
09:00 - 09:30 0.50 STWHIP P LNR1
09:30 - 10:00 0.50 STWHIP N RREP LNR1
10:00 - 10:30 ~ 0.50i STWHIP P ILNR1
p o peratlons
measured depth
Bottom of whipstock anchor 10,202', Whipstock oriented @ 30
degrees right
PU wt. 285K, SO wt. 235K
Top of window @ 10,181', Middle of window @ 10,190',
bottom of window @ 10,198'.
Set anchor w126K down, PU to verify anchor set w/10k over
Sheared running bolt w/50K down, PU attempt to rotate,
torqued up, work free
Displace sea water in wellbore w/ 11.5 ppg mud
Mill window in 9.625" casing.
Mill wing ~ in 9 F~"5" c~_;ing, top of window«?~10,181 [q FIT
de that it ,,i ._._ ~_
P . _.-
WOM 2-~+K, 70 RPM, 500 GPM, 1750 psi, Tq 16-17K, P/U wt
285K, S/O wt 235K, Rot wt 255K. Work
mill assembly up/down through window - no problems
Pump sweeps & circulate hole to clean metal from wellbore.
570 GPM 1940 psi "
Recovered 91 Ibs of metal
Perform Formation Integrity Test to 14.5# EMW, 1360 psi @
8701' TV D, Test OK
Investigate dropped object incident & repair top drive
Monitor well, well static, blow down kill line, pump dry job
110:30 - 17:00 ~ 6.50 STWHIP P ~L NR1 TOH from 10,160'
I Slow pump rate @ 8656' TV D, MP#1 - 2 BPM 270 psi, 3 BPM
~ ~ 310 psi
MP#2 - 2 BPM 280 psi, 3BPM
320 psi
17:00 - 19:00 2
OOi STWHIP Finish TOH to BHA
. P L NR1 LD BHA#1 -Milling assembly MiII 1/16 under gauge;
19:00 - 21:00 2
001 STWHIP
I Watermellon mill full gauge
. I P L NR1 Pull wear bushing, install bushing basket, RU BOP jetting tool,
wash metal cuttings from BOPs
j
~ I Function test pipe rams & blind rams, wash metal cuttings
from BOPs
21:00 - 23:30 50 i
2 STW H Install wear bushing
23:30 - 00:00 .
0.50 IP
STW HIP P
P L
L NR1
NR1 PJSM, Cut drilling line
00:00 - 02:30 1
2.50
DRILL
P
L
NR1 Service rig, lubricate top drive
MU BHA #2. Adj. mud mtr to 1.5. PU MWD, check
02:30 - 03:00 0.50 DRILL p
L
NR1 orientation. RIH w/ HWDP.
03:00 - 09:30
6
50 ~
DRILL
P TIH, Shallow test MWD at 575 gpm and 1370 psi. Test OK
09:30 - 10:00 .
0.50
DRILL
P L NR1 RIH to 10150' filling every 25 stds.
10:00 - 18:30
8
50
D L NR1 ___ ~
~ Fill DP. Orient tool face to 30 deg. right turn.
. RILL P N R1 Directional drill from 10,210' to 10,409'. Slide: 6.75 hrs; rotate:
0 hrs.. Slow Pmp Rate: at 10,250' MD (8734' TVD); #1 36
18:30 - 20:00 ~ 1.50 DRILL p spm @ 460 psi; #2 36 spm @ 480 psi.
20:00 - 21:00
1.00
DRILL
P LN R1 Circ mud and pmp sweep off bottom.
LN R1 Back ream from 10,409' to 10,210'. No tight spots, no
21:00 - 21:30 0.50 DRILL P
LN
R1 excessive drag or torque
21:30 - 00:00
2.50
DRILL P Pmp dry job and blow down top drive. Service top drive.
LN R1 POH to change BHA. At 6464' @ 00:00 hrs. Proper hole fill
Printed: 5/22/2006 11:56:32 AM
BP EXPLORATION
Operations Summary Report
Legal Well Name: NS14
Common Well Name: NS14
Event Name: REENTER+COMPLETE
Contractor Name: NABORS ALASKA DRILLING
Rig Name: NABORS 33E
Date From - To ~ Hours j Task Code ~ NPT
1/10/2006 21:30 - 00:00 2.50 DRILL P
1/11/2006 00:00 - 02:30 2.50 DRILL P
02:30 - 03:30 1.00 DRILL P
03:30 - 04:00 0.50 DRILL P
04:00 - 07:00 3.00 DRILL P
07:00 - 09:30 2.50 DRILL P
09:30 - 16:00 6.50 DRILL P
16:00 - 18:30 2.50 DRILL P
18:30 - 19:00 ~ 0.50 ~ DRILL ~ P
19:00 - 00:00 I 5.001 DRILL I P
Start: 12/28/2005
Rig Release: 5/21/2006
Rig Number: 33E
Phase
LNR1
LNR1
LNR1
LNR1
LNR1
LNR1
LNR1
LNR1
LNR1
LNR1
1/12/2006 00:00 - 01:30 1.50 DRILL P LNR1
01:30 - 04:00 2.50 DRILL N RREP LNR1
04:00 - 21:30 I 17.501 DRILL I P I I LNR1
21:30 - 23:00 I 1.501 DRILL I N I RREP I LNR1
23:00 - 00:00 I 1.001 DRILL I N I RREP I LNR1
1/13/2006 100:00 - 01:30 I 1.501 DRILL I N I RREP I LNR1
01:30 - 02:00 0.50 DRILL P LNR1
02:00 - 04:00 2.00 DRILL N RREP LNR1
04:00 - 00:00 I 20.001 DRILL I P I I LNR1
1/14/2006 00:00 - 04:00 4.00 DRILL P LNR1
04:00 - 05:00 1.00 DRILL N RREP LNR1
Page 4 of 17
Spud Date: 1 /8/2002
End:
Description of Operations
vol.
POH. Rack HWDP, jars, flex collars.
Break do and LD BHA #2.
Clear & clean floor. PJSM for MU BHA # 3.
PU and make up BHA # 3. Shallow test MWD and steerable
pads. PU Rhino Reamer and shallow test OK. RIH w/ HWDP.
PU, drift, and run 60 jts of 5" DP. Fill pipe every 10 stds.
RIH. Fill DP every 25 stds.
Open Smith Rhino Reamer (9.5"). Ream from 10,260' to
10,293' (bit depth). Pen. rates low. (Reamer depth: 10,211' to
10,244')
RIH to 10,405'. Open reamer. Wash and ream to 10,409'. 5'
of fill. Slow pmp rates C~ 10,404':
Pmp # 1: 25 spm ~ 388 psi; 35 spm Q 450 psi
Pmp # 2: 25 spm @ 370 psi; 35 spm @ 450 psi.
Directional drill and ream from 10,409' to 10,480'. Rotating:
4.5 hrs. ; Sliding: 0 Hrs.
Directional drill from 10,480' to 10,509,
Mud pump suctions plugged, both pumps. Possibly caused by
pit valve switching during weight-up process.
Directional drill from 10,509' to 11,000'. Rotating time: 10 hrs;
sliding 0 hrs.
SPR at 10,665' (9132' TVD) w/ 11.9 ppg mud:
Pmp # 1:24 spm @ 300 psi; 36 spm @ 390 psi
Pmp # 2: 24 spm G 300 psi; 36 spm @ 390 psi.
Noted pump press. dropping from 3000 psi to 2700 psi over 15
min.
Drl parameters: PU 285K, SO 220K; WOB 20K; RPM 150; 600
gpm @ 3000 psi; Torque 21 K on/15K off; ECD 12.9 ppg.
Diagnose circ. press. loss. Pr. tst surface lines from pumps to
3000 psi, OK. Check Pr. relief vlvs on mud pmps. Blow down
lines. Monitor well, OK.
POH looking for washout. Some drag (35K) through dog-leg
portion of open hole.
POH and found washout in 27th stand out (2574' MD).
Washout in slip area (2' below box end). Laid do bad jt. and
PU single. RIH. No problem running in thru window or in open
hole. Precautionary wash last 45' to bottom. No apparent fill
on bottom. Dir. drlg at 11,040' MD.
Service blocks and crown. Monitor well, static.
RIH. No problems running thru window or open hole.
Precautionary wash last 45' to bottom. No apparent fill on btm.
Directional drill from 11,000' to 11,463'. Rotating time: 15.9
hrs; sliding 0 hrs. Drlg parameters: PU: 295K; SO: 221 K; WOB
15/20K; RPM 150; 550 gpm C~2 2700 psi; Torq 23K on, 18K off;
ECD 13.4 ppg. SPR @ 11,145" MD
No. 1:24 spm C~ 250 psi; 36 spm C 360 psi
No. 2: 24 spm C~3 250 psi; 36 spm C~ 360 psi
Total rotating time: 15.9 hrs in last 24; Sliding hrs: 0
Drag on connections: 35K @ 11,427' & 50K C~ 11,333'.
Dir. drlg from 11,463' to 11,522'. Low ROP, possible bit balling.
Attempt to pump sweep to clean bit. Pit valve problems
caused pumps to air up and unable to circ. Worked pipe
Printed: 5/22/2006 11:56:32 AM
BP EXPLORATION
Operations Summary Report
Legal Well Name: NS14
Common Well Name: NS14
Event Name: REENTER+COMPLETE Start: 12/28/2005
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/21/2006
Rig Name: NABOBS 33E Rig Number: 33E
Date From - To I Hours Task ~ Code' NPT Phase
1/14/2006 04:00 - 05:00 I 1.00 DRILL (N (RREP LNR1
05:00 - 10:30 ~ 5.50 ~ DRILL ~ P ~ ~ LNR1
10:30 - 13:00 I 2.501 DRILL I N I DFAL I LNR1
13:00 - 13:30 0.50 DRILL N DFAL LNR1
13:30 - 18:00 4.50 DRILL N DFAL LNR1
18:00 - 18:30 0.50 DRILL N DFAL LNR1
18:30 - 22:30 4.00 DRILL N DFAL LNR1
22:30 - 23:00 0.50 DRILL N DFAL LNR1
23:00 - 23:30 0.50 DRILL N DFAL LNR1
23:30 - 00:00 0.50 DRILL N DFAL LNR1
1/15/2006 00:00 - 02:00 2.00 DRILL N DFAL LNR1
02:00 - 03:30 1.50 DRILL P LNR1
03:30 - 10:00 6.50 DRILL N DFAL LNR1
10:00 - 12:00 I 2.001 DRILL ~ N
12:00 - 12:30 0.50 DRILL N
12:30 - 13:00 0.50 DRILL N
13:00 - 13:30 0.50 DRILL N
13:30 - 00:00 10.50 DRILL P
1/16/2006 ~ 00:00 - 22:00 ~ 22.00 ~ DRILL ~ P
22:00 - 22:30
22:30 - 23:30
23:30 - 00:00
1/17/2006 00:00 - 01:30
0.501 DRILL I N
1.00 DRILL N
0.50 DRILL P
1.50 DRILL P
DFAL LNR1
RREP LNR1
DFAL LNR1
RREP LNR1
LNR1
LNR1
RREP LNR1
RREP LNR1
LNR1
LNR1
Page 5 of 17
Spud Date: 1 /8/2002
End:
Description of Operations
during time to get fluid prime back. 20K-30K spotty drag while
working pipe.
Dir. drl from 11,522' to 11,549'. ROP improved some when
back on bottom. ROP continued to decline. Pumped nut plug
sweeps for possible bit balling w/o success.
Drlg parameters: PU 295K; SO 240K; RWt 262K; WOB 20K;
RPM 150; 601 gpm @ 2600 psi; Torq 23K on, 19K off; ECD
13.5 ppg
SPR ~ 11,549' No.1 & 2, 25 spm G 230 psi; 35 spm @ 300
psi.
Total rotating time: 6.4 hrs in last 24 hrs; slide time = 0 hrs.
POH to above window. Backream 20' of first stand off bottom.
Wiped through tight spot (40K drag) @ 10,490'. 15-20K drag
from
Pmp dry job and blow down top drive.
POH to drill collars.
Monitor well-static. Cont. POH to MWD
Dn load MWD. LD Rhino reamer, bit, and rotary steerable tool.
Found washout in MW D tool 5' up from pin end. LD same.
MU BHA No. 4 w/ new bit & rotary steerable tool.
Shallow test rotary steerable tool-OK.
PU new 9.5" Rhino Reamer and shallow test same.
RIH with BHA No. 4.
RIH to 1862'. Fill DP and blow do all lines.
Service Top Drive, drawworks, and crown.
RIH. to 11,325' filling DP every 25 stds. Open 9.5" Rhino
Reamer
Ream from 11,325'to 11,534'. Parameters: 100 rpm, 10K
WOB, 626 gpm @ 3650 psi.
Work on IBOP on Top Drive.
Ream from 11,534' to 11,549'.
SCR #3 down due to apparent high current loading on
continuous basis (Pump # 1 on SCR #3). Switch to
Assignment #4 putting Pump No. 1 on SCR #1 and desks on
SCR #3
Dir. drl from 11,549' to 11,845'. Parameters: PU 310K, SO
230K, Rot wt 262K; 160 rpm, WOB 20K, 626 gpm @ 3536 psi.
SPR at 11,805' (10,169' TVD), 12.5 ppg, ECD 13.3 ppg.
Dir. drl from 11,845' to 12,386'. Top of Sag River @ 12830'
MD, 10,746' TVD from LWD log.
Drlg. parameters: PU 310K, SO 245K, Rt Wt. 260K; WOB 20K,
RPM 160, 618 gpm C 3425 psi, Torq on 24K, off 24K; ECD
13.3 ppg. SPR at 12,193' MD (10,706' TVD) 12.5 ppg:
Pmp #1 25 spm @ 250 psi, 35 spm ~ 300psi
Pmp #2 25 spm @ 250 psi, 35 spm C~ 310 psi
Swivel packing leaking. Blow down top drive. PU off bottom,
install TIW and headpin. Circ through cmtg hose during swivel
repair.
Change out swivel washpipe.
Wash back to TD, OK.
Circ & cond hole. CBU ~ 625 GPM, 3460 psi, 120 RPM.
Hole appears clean. SPR at 12,386', 10,798' TVD, 12.5 ppg: #
1 & 2; 25 spm G 200 psi, 35 spm ~ 260 psi.
Printed: 5/22/2006 11:56:32 AM
BP EXPLORATION Page 6 of 17
Operations Summary Report
Legal Well Name: NS14
Common Well Name: NS14 Spud Date: 1/8/2002
Event Name: REENTER+COMPLETE Start: 12/28/2005 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/21/2006
Rig Name: NABOBS 33E Rig Number: 33E
Date ~ From - To Hours Task Code NPT ~ Phase I Description of Operations
__ _ -__-
1/17/2006 101:30 - 04:30 3.001 DRILL P LNR1
04:30 - 05:00 0.50 DRILL P LNR1
05:00 - 06:30 1.50 DRILL P LNR1
06:30 - 08:00 1.50 DRILL P LNR1
08:00 - 11:00 3.00 DRILL P LNR1
11:00 - 11:30 0.50 DRILL P LNR1
11:30 - 13:30 2.00 DRILL P LNR1
13:30 - 14:00 I 0.501 DRILL I P I I LNR1
14:00 - 15:30 I 1.501 DRILL I P I I LNR1
15:30 - 17:00 1.50 DRILL P LNRi
17:00 - 17:30 0.50 DRILL P LNRi
17:30 - 22:00 4.50 DRILL P LNR1
22:00 - 00:00 2.00 DRILL P LNR1
1/18/2006 00:00 - 01:30 1.50 DRILL P LNR1
01:30 - 02:30 1.00 CASE P LNR1
02:30 - 03:30 1.00 CASE P LNR1
03:30 - 04:00 0.50 CASE P LNR1
04:00 - 10:30 6.50 CASE P LNR1
10:30 - 12:00 I 1.501 CASE I P I I LNR1
12:00 - 12:30 0.50 CASE P LNR1
12:30 - 13:30 1.00 CASE P LNR1
13:30 - 21:30 8.00 CASE P LNR1
21:30 - 22:30 I 1.001 CASE I P I I LNR1
22:30 - 23:00 0.50 CASE P LNR1
23:00 - 00:00 1.00 CASE P LNR1
1/19/2006 00:00 - 02:00 2.00 CASE P LNR1
02:00 - 02:30 0.50 CASE P LNR1
02:30 - 05:30 3.00 CASE P LNR1
05:30 - 06:00 0.50 CASE P LNR1
06:00 - 08:30 2.50 CEMT P LNR1
POH to window. Wipe tight spots between 11,700' & 11,800'.
(60K drag). Tight spots pulling BHA into window (MWD & CDR
tools). Hole vol. during trip OK.
Service top drive @ window.
RIH to 10,250' (reamer below window). CBU.
RIH from 10,250' to 12,386'. 12' of fill.
Circ and cond hole for liner. CBU X 4 at 600 gpm @ 3300 psi.
Pull one stand after second BU and complete circ. Recip. and
rotate pipe during conditioning.
Blow do lines and top drive. Monitor well, OK.
POH to 10,820' (one tight spot @ 11,750', pulled through
OK-pulled 60K over).
Spot G Seal pill from 10,820' to 10,360'. Pump at 90 spm @
1060 psi.
POH to top of window at 10,181'. Had to rotate pipe slowly
without pump to work flexicollars into window. All other BHA
came thru OK. PU 275K, SO 215K in casing.
CBU X 2 to clean hole. Pmp 600 gpm @ 3400 psi.
Monitor well, OK Pmp dry job, blow do lines.
Drop 2.5" hollow rabbit and POH to HWDP.
PJSM. LD BHA.
LD HWDP. LD MWD/LWD tools, reamer, flexicollars, &jars.
Clear rig floor.
Rig up casing tongs and casing running equipment.
PJSM to run liner.
Run 58 jts 7", 26#, L-80, Hydril 521 liner, per plan. Bakerloc
first 3 connections. Ran cent. per plan.
Pick up Baker 7" HRD liner hanger assembly. One centralizer
on each of the two joints below hanger. Check service breaks.
Rig up to circ at 2478'.
Circ. liner vol. Pmp 103 bbls at 5 BPM @ 288 psi.
Run liner on DP. Fill at 20 stds (50% of vol.) then every 10
stds after. Ran 82 stds and lay do single.
Circ BU at 10,117' (above window) at 6.7 BPM @ 765 psi. PU
255K, SO 205K, Rot torq 13K.
Make up cement head and TIW on DP pup.
Continue running liner on DP, 10,687' @ 00:00 hrs.
Run 7" liner to 12,380'. Took weight. PU 2'.
PU cmt head.
Establish circ. Stage up to 7 BPM at 1050 psi. Cond mud and
hole. Wash do 3' to 12,383'. Prep to cmt. Hole in good
condition. No tight spots. Running weight at TD, SO 205K, PU
320K. Pipe free.
PJSM to cement liner.
Test lines to 4500 psi. OK. Pump 50 bbl 13.5 ppg MUD PUSH
II spacer at 5 BPM and 1200 psi. batch mix and pump 150 bbl
(450 sx) 15.8 ppg CI G w/ additives at 4 BPM @ 950 psi. Drop
plug. Switch to rig pumps. Displ w/ mud at 7.6 BPM @ 650 psi.
Latch liner wiper plug with 1980 stks. Displ w/ rig pmps at 7.2
BPM @ 1050 psi incr to 1225 psi . Reduced rate to 3 BPM 20
bbls before bumping plug. Bump plug at 256 bbls. CIP @
08:16. Pr to 4200 psi for 5 min. OK. Check floats OK. Hang
liner & set pkr with 80K down. Fu{1 rtns during cementing.
Printed: 5/22/2006 11:56:32 AM
BP EXPLORATION
Operations Summary Report
Page 7 of 17
Legal Well Name: NS14
Common Well Name: NS14 Spud Date: 1/8/2002
Event Name: REENTER+COMPLETE Start: 12/28/2005 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/21/2006
Rig Name: NABOBS 33E Rig Number: 33E
Date ~ From - To Hours Task ~ Code I, NPT Phase I Description of Operations
1/19/2006 ~ 08:30 - 10:30 2.00 CEMT ~ P ~ LNR1
10:30 - 11:00 0.50 CEMT P LNR1
11:00 - 11:30 0.50 CEMT P LNR1
11:30 - 13:30 2.00 CEMT P LNR1
13:30 - 15:30 2.00 CEMT P LNR1
15:30 - 19:00 3.50 CEMT P LNR1
19:00 - 19:30 0.50 CEMT P LNR1
19:30 - 20:00 0.50 CEMT P LNR1
20:00 - 21:30 1.50 WHSUR P PROD1
21:30 - 00:00 2.50 BOPSU P PRODi
1/20/2006 ~ 00:00 - 01:30 ~ 1.50 ~ BOPSUp P ~ ~ PROD1
01:30 - 02:30 1.00 BOPSU~ P PROD1
02:30 - 09:00 6.50 BOPSU P PRODi
09:00 - 11:30 ( 2.501 BOPSUR P I I PROD1
11:30 - 12:00 0.50 WHSUR P PROD1
12:00 - 13:30 1.50 DRILL P PROD1
13:30 - 15:00 I 1.501 EVAL I P I I PROD1
15:00 - 19:30 ( 4.501 DRILL I P I I PROD1
19:30 - 21:30 2.00 DRILL P PRODi
21:30 - 00:00 2.50 DRILL P PROD1
1/21/2006 00:00 - 02:00 2.00 DRILL N RREP PRODi
02:00 - 07:00 I 5.001 DRILL I P I I PROD1
07:00 - 07:30 0.50 DRILL P PROD1
07:30 - 08:30 1.00 DRILL P PROD1
08:30 - 09:00 0.50 DRILL P PROD1
09:00 - 09:30 0.50 DRILL P PROD1
09:30 - 15:30 6.00 DRILL N RREP PROD1
15:30 - 18:00 2.50 DRILL P PROD1
18:00 - 19:30 1.50 DRILL P PROD1
19:30 - 22:00 2.50 DRILL P PROD1
22:00 - 22:30 0.50 DRILL P PROD1
22:30 - 00:00 1.50 DRILL N SFAL PROD1
Unsting from hanger and circ out excess cement. Est 20 BBL
cmt excess.
LD cmt head.
Blow do lines. Monitor well. OK
POH with liner running tool. POH to 7832'
Slip and cut 118' of drilling line.
POH to 500'
Pull air slips and wiper rubber.
Pull to liner running tool. Inspect, OK. Break do and lay do
same.
Drain stack and pull wear ring. Set test plug.
Install 2.875"X5" ram blocks in top. Install 3.5"X6" ram blocks
in bottom. Test Choke manifold to 250 psi and 5000 psi.
Clean pits. The right to witness the BOP test waived by
AOGCC representative John Spaulding
Complete installing 2 7/8" X 5" ram blocks in upper section of
BOP.
RU to test ROPE. Install test plug. Open annulus valve.
Test Annular 250 psi low 3500 psi high each for 5 mins. Witn
5" tst jt, test both sets variable pipe rams - blind/shear rams -
HCR Choke - HCR kill -Manual Choke -Manual kill -Choke
manifold -Upper /Lower IBOP -Floor safety valves (5"); all to
250 psi and 5000 psi for 5 mins., OK -Perform Accumulator
test -Had to change out one TIW valve. John Spaulding with
AOGCC wavied right to witness of BOP test.
LD 5" test jt. PU 4" test jt. and test upper and lower variable
pipe rams on 4' size, OK. Test 4" TIW and 4" dart floor valves;
all to 250 psi and 5000 psi for 5 mins. OK.
Install wear bushing.
PU Schlumberger E-line logging tools. RU to pr. tst csg/liner.
Replace breaker in #3 SCR.
Test casing/liner to 3000 psi for 30 min. OK. Bleed off and
blow do lines.
PJSM. RU E-line logging tools. Run GR-CCL PDC log from
12,240' to 9180'. Tie in with original PDC log dated 2/17/2002.
Clear floor. Chg elevators. BD test jt and floor vlvs.
PU 4", 14#, S-135, HT-40 DP. 53 jts picked up at 00:00 hrs.
Noted slack in drilling line on the drum near the locking wedge.
Hang blocks, lay out drlg line off drum, and pull out slack.
Respool.
Continue picking up 4" DP out of pipe shed. Total of 153 jts.
(4811.85'). Rabbited to 2 3/8"
PJSM. Rev. circ 50 bbls to clean 4" DP.
Service top drive and crown.
Blow do lines.
POH with 4" DP
Crown-o-matic not working. Work on same.
Continue POH w/ 4" DP. SLM.
Clear floor. Change elevators. PJSM to PU BHA.
PU BHA #5. Clear floor and change elevators.
RIH w/ 5 stds 4" DP.
Circ. across top of hole. Attempt to pump do string. Could not
circ. Steam IBOP.
Printed: 5/22/2006 11:56:32 AM
BP EXPLORATION
Operations Summary Report
Legal Well Name: NS14
Common Well Name: NS14
Event Name: REENTER+COMPLETE
Contractor Name: NABOBS ALASKA DRILLING I
Rig Name: NABOBS 33E
Date From - To Hours Task Code NPT
Start: 12/28/2005
Rig Release: 5/21/2006
Rig Number: 33E
Phase
1/22/2006 00:00 - 13:00 13.00 DRILL N SFAL PROD1
13:00 - 14:00 1.00 DRILL P PROD1
14:00 - 16:30 2.50 DRILL P PROD1
16:30 - 18:00 1.50 DRILL P PROD1
18:00 - 00:00 6.00 DRILL P PROD1
1/23/2006 100:00 - 01:00 I 1.001 DRILL I P I I PROD1
01:00 - 03:30 I 2.501 DRILL I P I I PROD1
03:30 - 04:00 0.50 DRILL P PROD1
04:00 - 07:00 3.00 DRILL P PROD1
07:00 - 10:30 3.50 DRILL P PROD1
10:30 - 12:00 1.50 DRILL P PROD1
12:00 - 13:30 1.50 DRILL P PROD1
13:30 - 15:30 2.00 DRILL P PROD1
15:30 - 17:00 I 1.501 DRILL I P I I PROD1
17:00 - 00:00 7.001 DRILL P PROD1
1/24/2006 100:00 - 07:30 I 7.501 DRILL I P I I PROD1
07:30 - 08:00 I 0.501 DRILL I N I DPRB I PRODi
08:00 - 08:30 I 0.501 DRILL I P I I PROD1
08:30 - 12:00 I 3.501 DRILL I N I DPRB I PROD1
Page 8 of 17
Spud Date: 1 /8/2002
End:
Description of Operations
Thawing kelly hose and standpipe. (-90F chill factor). Ran
steam hoses in kelly hose and manifold end of standpipe.
Standpipe warmed. Remove kelly hose and run conduit
pipe/steam inside kelly hose. Thawed ice plug. Reconnect
kelly hose. Blow do system.
Circ do DP to shallow test BHA, OK. Blow dn. lines.
RIH w/ 4" DP to 5001'.
Circ. & test BHA, OK.
RIH w/ 5" DP to 12,200'. Prep to circ and wash do to cmt top.
No problem going into liner with 1.83 deg bent sub and BHA.
PU 280K, SO 205K, RWT 222K at 12,195'.
Wash do to landing collar. Tagged plugs at 12,296'. Drl spotty
cmt stringers to landing collar.
Drill plugs and landing collar at 12,298' and float collar at
12,338'. Firm cmt below landing collar. Could not feel float
collar. Drill firm cmt to 12,375'. Drt w/ 40 RPM top rotary &
165 RPM DH motor; 70 spm (249 gpm) at 1200-1600 psi (mud
contaminated salt water drilling fluid).
Circ and cond. PJSM for mud displacement.
Displ. old mud with 9.0 ppg Flo-Pro system. Pmp 30 bbl hi-vis
spacer, 100 bbl sea water, 30 bbl hi-vis spacer followed by
Flo-Pro system. Pmp at 70 spm. Reciprocate pipe throughout
displacement. Pmp. 750 bbls.
Clean L Pit. Service top drive and DW.
Drill shoe at 12,283' (10,797' TVD). SPR: 9 ppg mw, #1 & 2,
30 spm ~ 540 psi; 40 spm @ 650 psi.
PU 275K, SO 235K, RWT 250K.
Dir. drl (slide) from 12,386' to 12,406' (10,817' TVD) for FIT.
Circ. BU at 70 spm, 1300 psi. Cond. to 9.0 ppg. Pull up to
shoe.
Perform FIT test to equivalent MW of 11.5 ppg. Pr. up to 1440
psi w/ 3.9 bbl (46 stks). Held pr. for 10 min. OK.
Dir drill from 12,406' to 12,520' (10,915' TVD). Drl w/ 8-15K
WOB, 165 rpm DHM (sliding); 250 gpm (70 spm), 1500 psi; PU
270K, SO 230K.
Directional drilling from 12520' to 12711'
Drilling w/250 GPM 1350 psi off btm, 1450 psi on btm
Lost returns C~2 12711', Lost 24 bbls
Fill wellbore w/fluid, monitor static loss rate for 20 min. w/ no
loss
Directional drilling from 12711' to 12727'
Drilling w/250 GPM 1350 psi on btm, dynamic loss 24 BPH
Increase in flowrate from 10% to 17%, PU monitor wellbore
Well flowing, Shut-in well, SIDPP 0 psi, SICP 980 psi
While shutting in well, 4 bbls drilling mud "SPILL" was
discharged onto the rig floor and contained in secondary
containment, Start circulating out influx using drillers method
Pump 56 Bbls to fill hole & establish returns
Shut in well, monitor pressures SIDPP 120 psi, SICP 480 psi
Circulate gas influx from wellbore using driller's method
Casing pressure dropped from a max of 790 psi to 30 psi after
3800 strokes
Gas circulated from wellbore, worked drill pipe
Printed: 5/22/2006 11:56:32 AM
BP EXPLORATION
Operations Summary Report
Legal Well Name: NS14
Common Well Name: NS14
Event Name: REENTER+COMPLETE Start: 12/28/2005
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/21/2006
Rig Name: NABOBS 33E Rig Number: 33E
Date '~ From - To I Hours I Task I Code I NPT I Phase
1/24/2006 08:30 - 12:00 3.50 DRILL N
12:00 - 17:30 5.50 DRILL N
17:30 - 00:00 I 6.501 DRILL I N
1/25/2006 100:00 - 03:00 I 3.001 LCR I N
03:00 - 13:00 I 10.001 LCR I N
13:00 - 15:30 I 2.501 LCR I N
15:30 - 00:00 I 8.501 DRILL I P
1/26/2006 100:00 - 17:30 I 17.501 DRILL I P
17:30 - 21:00
21:00 - 00:00
1 /27/2006 100:00 - 02:00
3.50 DRILL P
3.00 DRILL P
2.00 DRILL P
DPRB PROD1
DPRB PROD1
DPRBIPRODI
DPRBIPRODI
DPRB PROD1
DPRB PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
Page 9 of 17
Spud Date: 1 /8/2002
End:
Description of Operations
Notified appropriate BP personnel and agencies
Shut down, monitor wellbore pressure for 10 min. SIDPP 30
psi, SICP 132 psi
Bleed casing pressure to 66 psi, Shut-in casing for 5 min.
pressure increase to 86 psi
Bleed casing pressure to 38 psi
Circulate wellbore increasing MW from 9.0 ppg to 9.2 ppg,
working pipe every 30 min
Started losing mud before 9.2 ppg mud returned to surface,
changed pump rates losses continued
Increase pump rate complete circulation w/9.2 ppg mud
Opened well and observed static losses @ 69 BPH
Mix & pump LCM pills
LCM pill #1 - 50 bbls, 97# LCM/Bbl, 60 sx Safe Carb 200, 60 sx
Safe Carb 40, 43 sx Safe Carb 10
Static losses 69 BPH
LCM pill #2 - 50 bbls, 80# LCM/Bbl, 35 sx Safe Carb 40, 15 sx
Safe Carb 250, 30 sx Safe Carb 500
Static losse 125 BPH
Reduced mud weight from 9.2 ppg to 9.1 ppg while keeping
hole full
PU weight 280K, SO weight 235K
Mix & Pump LCM pill
LCM pill #3 - 50 bbls, 50# LCM/Bbl, 25 sx MI Seal Med, 30 sx
Mix II Med, 5 sx Nut Plug Med, 20 sx Mix II Fine
Current static losses are 25 BPH, Current Dynamic losses
210 GPM are 48 BPH
PU weight 280K, SO weight 235K
Build mud volume
Circulate - 410 psi @ 45 GPM
Build mud volume, Mix & Pump LCM pill
LCM pill #4 - 50 bbls, 50# LCM/Bbl, 25 sx MI Seal Med, 30 sx
Mix II Med, 5 sx Nut Plug Med, 20 sx Mix II Fine
Directional drill from 12727' to 12882'
Pump pressure 1225 psi ~ 225 GPM
WOB 15K, PU weight 280K, SO weight 235K, Rot weight 250K
Current static losses are 5 BPH, Current Dynamic losses ~
225 GPM are 30 BPH
Total mud loss last 24 hrs - 422 Bbls
Directional drill from 12882' to 13333'
DP pressure 1325 psi @ 225 GPM, WOB 10K
PU weight 275K, SO weight 235K, Rot weight 260K
Circulate, Raise MW from 9.1 PPG to 9.2 PPG
Dynamic fluid losses increased from 20-30 BPH to 45 BPH
during weight up
Static fluid losses ~ 25-30 BPH
Pump out of hole with full drilling circulation rate of 225 GPM
Pull from 13333' to 12380', 7" drlg liner shoe @ 12383'
Wellbore taking fluid ~ 35 - 45 BPH
Keeping hole full during TOH operations
Total mud losses during the last 24 hrs - 554 Bbls
Spot LCM pill C~ 7" liner shoe 12383'
Pump pill C~ 1-1.5 BPM after pill @ shoe, Losses while
Printed: 5/22/2006 11:56:32 AM
BP EXPLORATION Page 10 of 17
Operations Summary Report
Legal Well Name: NS14
Common Well Name: NS14 Spud Date: 1/8/2002
Event Name: REENTER+COMPLETE Start: 12/28/2005 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/21/2006
Rig Name: NABOBS 33E Rig Number: 33E
Date From - To i Hours Task Code NPT ~ Phase I Description of Operations
1/27/2006 00:00 - 02:00 2.00 DRILL P PROD1 pumping 1-1.5 bpm
LCM Pill - 60 Bbls - 50 PPB Fiber LCM
02:00 - 03:00 1.00 DRILL P PROD1 Monitor well, Blow down mud lines
Static losses C~ 40-45 bph
03:00 - 04:00 1.00 DRILL P PROD1 POH from 12383' to 11534'
04:00 - 05:30 1.50 DRILL P PROD1 MAD Pass pulled from 11534' to 11434'
05:30 - 06:00 0.50 DRILL P PROD1 Monitor well, Blow down mud lines
06:00 - 07:30 1.50 DRILL P PROD1 POH from 11434' to 10027'
Top of 7" liner C~3 10027'
07:30 - 09:30 2.00 DRILL P PROD1 Monitor well, well static
Drop ball, shear circulating port
Circulate Btm Up @ 420 GPM, Heavy cuttings over shaker
09:30 - 17:00 7.50 DRILL P PROD1 POH from 10027' to 185'
17:00 - 18:30 1.50 DRILL P PROD1 Monitor well
LD BHA #5
18:30 - 22:30 4.00 DRILL P PROD1 Make up BHA #6
22:30 - 23:00 0.50 DRILL P PROD1 RIH to 703'
23:00 - 23:30 0.50 DRILL P PROD1 Shallow test MW D, 860 psi C~ 250 GPM, Test OK
23:30 - 00:00 0.50 DRILL P PROD1 RIH from 703' to 1930'
Total mud losses during the last 24 hrs - 540 bbls
1/28/2006 00:00 - 03:00 3.00 DRILL P PROD1 RIH from 1930' to 5046', Fill DP every 25 stands
03:00 - 03:30 0.50 DRILL P PROD1 Change elevators & make up safety valve
4" to 5" Drill Pipe
03:30 - 09:00 5.50 DRILL P PRODi RIH from 5046' to 12191', Fill DP every 25 stands
09:00 - 09:30 0.50 DRILL P PROD1 Service top drive
09:30 - 10:30 1.00 DRILL P PROD1 RIH from 12191' to 13096'
10:30 - 12;00 1.50 DRILL P PROD1 Ream from 13096' to 13333', DP pressure 1270 psi ~ 245
GPM, Torque 12K
PU wt - 280K, SO wt - 220K, Rot wt - 250K
SPR #1 - 30 stks 550 psi, 40 stks 640 psi, MW 9.1 ppg, Depth
13192'
SPR #2 - 30 stks 520 psi, 40 stks 620 psi, MW 9.1 ppg, Depth
13192'
12:00 - 00:00 12.00 DRILL P PROD1 Directional drill from 13333' to 13857', DP pressure 1400 psi ~
250 GPM
RPM 40, WOB 6-8K, Torque 12K
AST 1.91 hrs, ART 6.79 hrs
SPR #1 - 30 stks 430 psi, 40 stks 550 psi, MW 9.1 ppg, Depth
13667'
SPR #2 - 30 stks 450 psi, 40 stks 550 psi, MW 9.1 ppg, Depth
13667'
1/29/2006 00:00 - 10:00 10.00 DRILL P PROD1 Directional Drill from 13857' to 14230' TD, TVD 11145'
DP Pressure 1400 psi @ 250 GPM, MW 9.1 ppg
WOB 10K, RPM 40, Torque 11 K, PU 285K, SO 230K, Rot
260K
10:00 - 10:30 0.50 DRILL P PROD1 Circulate 4X Open Hole Volume
10:30 - 18:30 8.00 DRILL P PRODi MAD PASS from 14230' to 12383'
18:30 - 21:30 3.00 DRILL P PROD1 Pump 25 bbl - 50#/bbl LCM pill @ 12383', 7" liner shoe
Reduced pump rate to 1/2 to 3/4 bpm when LCM pill reached
shoe
Dynamic losses @ 3/4 bpm - 35 to 45 BPH
LCM pill - 10 ppb MI Seal Med, 20 ppb Mix II Med, 20 ppb Mixll
Fine
Printed: 5/22/2006 11:56:32 AM
BP EXPLORATION Page 11 of 17
Operations Summary Report
Legal Well Name: NS14
Common Well Name: NS14 Spud Date: 1/8/2002
Event Name: REENTER+COMPLETE Start: 12/28/2005 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/21/2006
Rig Name: NABOBS 33E Rig Number: 33E
Date From - To Hours Task Code NPT j Phase Description of Operations
1/29/2006 21:30 - 23:00 1.50 DRILL P PROD1 RIH from 12383' to 14230'
Wash last stand to btm, no fill
23:00 - 00:00 1.00 DRILL P PROD1 Circulate btm up, DP Pressure 1500 psi ~ 250 GPM
1/30/2006 00:00 - 01:00 1.00 DRILL P
01:00 - 04:00 3.00 DRILL P
04:00 - 05:00 1.00 DRILL P
05:00 - 06:30 1.50 DRILL P
06:30 - 08:00 I 1.501 DRILL I P
08:00 - 09:00 1.00 DRILL P
09:00 - 11:00 2.00 DRILL P
11:00 - 12:00 1.00 DRILL P
12:00 - 14:00 2.00 DRILL P
14:00 - 19:00 5.00 DRILL P
19:00 - 22:00 3.00 DRILL P
22:00 - 00:00 2.00 DRILL P
1/31/2006 00:00 - 01:00 1.00 DRILL P
01:00 - 01:30 0.50 DRILL
01:30 - 04:30 3.00 CASE P
04:30 - 09:30 5.00 CASE P
09:30 - 11:30 I 2.001 CASE I P
11:30 - 12:00 0.50 CASE P
12:00 - 13:00 1.00 CASE P
13:00 - 15:00 2.00 CASE P
15:00 - 00:00 9.00 CASE P
2/1/2006 100:00 - 03:00 I 3.001 CASE I P
Worked and rotated drill string while circulating
Total mud losses last 24 hrs 851 Bbls
PROD1 Circulate btm up while reciprocating drill string
PROD1 Pump out of open hole from 14230' to 12383'
DP pressure 1200 psi @ 250 GPM
PROD1 Circulate 1/2 btm up @ 12383'
DP pressure 1200 psi @ 250 GPM
PROD1 Check flow, Static losses 25 BPH, POH slow from 12383'
Watching hole for swabbing, Hole not filling properly C 11296'
Monitor well, Static losses Q 25 BPH
PROD1 Break circulation, pump out of hole from 11296' to circulating
sub @ 10027'
DP pressure 990 psi @ 250 GPM
Static losses G top of 7" drilling liner (10027') 25 BPH
PROD1 Drop dart, open circulating sub, circulate
DP pressure 850 psi @ 420 GPM
PROD1 1600 units gas while circulating Btm Up from liner top
Circulate 2X Btm Up w/DP pressue 850 psi ~ 420 GPM
PROD1 Pump out of hole to 10027', Bit above 7" liner top
Monitor well C~ top of liner, Static losses 25 BPH
PROD1 Circulate @ 10027, DP pressure 800 psi @ 420 GPM
Monitor well, Static losses @ 25 BPH, Pump dry job
PROD1 POH from 10027' to 2777', Standing back 5" & 4" drill pipe
PROD1 PJSM, Lay down 2547' of 4" drill pipe (81 jts)
PROD1 PJSM w/ Schlumberger -Nuclear source handling
LD BHA #6
PROD1 LD BHA #6
PROD1 Clear & clean rig floor
RUNPRD RU Equipment to run 4.5" Production Liner
Static losses 14 BPH
RUNPRD PJSM, Run 45 joints 4.5", 12.6#, 13Cr80, Vam Top Production
Liner
Baker lock bottom 3 connections, Verify floats OK
Torque turn all connections, Fill each joint
Run liner and centralizers per plan
RUNPRD Install Pal Mix in tie back sleeve
RD tongs & compensator, c/o bails & elevators
Clear rig floor
RUNPRD MU X-Os, RIH w/ 1 stand of 4" DP
RUNPRD Circulate liner volume, Circulating pressure 140 psi Ca3 210
GPM
Blow down lines
RUNPRD RIH w/ 4.5" liner on 4" drill pipe 24 stands
Filling pipe every 10 stands
RUNPRD Change evelators to run 5" DP
RIH w/ 4.5" liner on 5" drill pipe to 7" liner shoe ~ 12383'
Filling pipe every 10 stands
Losses Q 15 BPH while RIH w/ liner
RUNPRD Circulate BU ~ 7" Liner Shoe C~ 12383'
Circulate @ 210 GPM - 455 psi
Printed: 5/22/2006 11:56:32 AM
BP EXPLORATION Page 12 of 17
Operations Summary Report
Legal Well
Common W
Event Nam
Contractor
Rig Name:
Date Name:
ell Name:
e:
Name:
From - To NS14
NS14
REENTE
NABOB
NABOB
Hours
R+COM
S ALASK
S 33E
Task
PLET
A DRI
Code
E
LLING
NPT ~
Start
I Rig
Rig
Phase
Spud Date: 1/8/2002
: 12/28/2005 End:
Release: 5/21/2006
Number: 33E
Description of Operations
2/1/2006 00:00 - 03:00 3.00 CASE P RUNPRD 40 units gas, MW cut to 8.8+ for 15 minutes
03:00 - 05:00 2.00 CASE P RUNPRD RIH w/ 4.5' production liner on 5" drill pipe to 14136'
05:00 - 05:30 0.50 CASE P RUNPRD Wash liner to bottom @ 14230'
Circulating @ 110 GPM - 390 psi, while reciprocating drill string
05:30 - 08:00 2.50 CASE P RUNPRD Circulate BU & reciprocate liner & drill string - 170 units of gas
on B/U.
Circulating C~3 210 GPM - 625 psi
PU weight 282K, SO weight 238K
08:00 - 08:30 0.50 CEMT P RUNPRD RU Baker cementing head, cement line & wash up line
08:30 - 11:00 2.50 CEMT P RUNPRD Circulate & reciprocate liner & drill string
R/U cementers
PJSM for cement job.
11:00 - 14:00 3.00 CEMT P RUNPRD Pump 5 bbls water & test lines to 4500 psi
Pump 15 bbls CW 100 @ 3 BPM - 475 psi
Pump 30 bbls Mud Push II @ 5.5 BPM - 740 psi
Pump 74 bbls Class G, 15.8 ppg cement C~3 4.8 BPM - 570 psi
Wash up w/ 5 bbls Perf Pill via bypass line
Displace w/ 48 bbls Perf Pill @ 6.8 BPM - 130 psi
27 bbls 8.3 ppg water, 140 bbls 9.0 ppg mud
Bump plug w/ 220.2 bbls total displacement @ 2435 psi
Set down 45K on liner hanger to ensure setting -repeat
sequence to ensure set.
Bleed pressure check floats -held OK
Apply pressure to set ECP #1 @ 2770 psi
Increase pressure to set ECP #2
Increase pressure to release setting tool -release OK
Set down 45K to set liner top packer. repeat sequence with
rotation.
14:00 - 16:30 2.50 CEMT P RUNPRD Pressure to 1000#, PU to circulate
Circulate ~ 6.2 BPM - 650 psi, 9500 strokes
circulate out 20 bbls contaminated cement
16:30 - 19:30 3.00 CEMT P RUNPRD LD cement head, Blow down & RD lines
Pressure test well bore to 1000 psi for 10 min -Held Ok
19:30 - 23:00 3.50 CEMT P RUNPRD Displace 9.1 ppg Mud w/ 30 bbls high vis sweep
220 bbls sea water @ 6 BPM - 450 psi
30 bbls high vis weighted sweep
Finish displacement w/ 9.3 ppg brine G 10 BPM - 1100 psi
Shut down, monitor well -well static
23:00 - 00:00 1.00 CEMT P RUNPRD Clean trip tanks, Service rig
2/2/2006 00:00 - 03:00 3.00 CEMT P RUNPRD Clean trip tanks, Clear & clean rig floor of casing & cementing
equipment
03:00 - 03:30 0.50 CEMT P RUNPRD Break circulation, pump dry job, blow down lines
03:30 - 11:00 7.50 CEMT P RUNPRD POH w/ 5" DP, wellbore filling correctly
11:00 - 11:30 0.50 CEMT P RUNPRD RU 4" DP handling equipment
Check flow -well static
11:30 - 14:30 3.00 CEMT P RUNPRD LD 72 jts of 4" DP
14:30 - 15:00 0.50 CEMT P RUNPRD Pull wear bushing
15:00 - 16:00 1.00 CEMT P RUNPRD RU equipment to run 4.5" tubing
16:00 - 17:00 1.00 CASE P RUNPRD Run 8 jts of 4.5", 12.6#, 13Cr80, Class B tubing
17:00 - 21:00 4.00 WHSUR P RUNPRD MU tubing hanger w/ BPV in place
Drain stack, thawed drain lines for 2 hrs
Land hanger, run in lock down pins
Test hanger to 5000 psi for 10 min
Printed: 5/22/2006 11:56:32 AM
BP EXPLORATION
Operations Summary Report
Legal Well Name: NS14
Common Well Name: NS14
Event Name: REENTER+COMPLETE
Contractor Name: NABOBS ALASKA DRILLING
Rig Name: NABOBS 33E
Date From - To ;Hours Task Code NPT j
i
2/2/2006 21:00 - 23:00 ~ 2.00 ~ BOPSUF~ P
23:00 - 00:00 I 1.00 I BOPSUR P
2/3/2006 00:00 - 02:30
02:30 - 03:30
03:30 - 06:30
2.50 BOPSU P
1.00 BOPSU P
3.00 BOPSU P
06:30 - 09:00
09:00 - 10:00
10:00 - 11:00
11:00 - 12:00
12:00 - 13:00
13:00 - 16:30
16:30 - 18:30
18:30 - 19:00
5/12/2006 07:00 - 11:00
11:00 - 13:00
13:00 - 16:00
16:00 - 23:00
23:00 - 00:00
5/13/2006 00:00 - 01:30
01:30 - 03:00
03:00 - 04:00
2.50 WHSUR P
1.00 WHSUR P
1.00 WHSUR P
1.00 WHSUR P
1.00 WHSUR P
3.50 WHSUR P
2.00 WHSUR P
0.50 WHSUR P
4.00 MOB P
2.00 MOB P
3.00 MOB P
7.00 MOB P
1.00 MOB P
1.50 MOB P
1.50 MOB P
1.00 RIGU P
Page 13 of 17
Spud Date: 1/8/2002
Start: 12/28/2005 End:
I Rig Release: 5/21/2006
Rig Number: 33E
Phase Description of Operations
RUNPRD NDBOPE, remove hoses, disconnect choke & kill lines
Remove mouse hole
RUNPRD Change rams in bottom BOP
Removed 3.5" X 6" variables, Installed 4.5" X 7" variables
RUNPRD Install 4" X 7" variable pipe rams in bottom single BOP
Clean cellar area
RUNPRD Clear & clean rig floor, clean below rotary table
RUNPRD Remove roughneck track, riser & lower koomey lines
Secure choke & kill lines for rig move
ND BOPs & secure in cradle, remove adapter spool from
wellhead
RUNPRD NU production tree
RUNPRD Test hanger, neck seals, lock down pins to 5K
RUNPRD Pull BPV, RU to pump freeze protect
RUNPRD Test lines to 1000 psi
Reverse circulate 26 bbls freeze protect diesel
RUNPRD Install TWC
RUNPRD Pressure test tree to 4000 psi w/ Little Red
Very difficult getting test w/heated diesel
Pressure test tree to 5000 psi w/ Vetco
RUNPRD Clean trip tanks, send fluids to G & I for disposal
RUNPRD G & I disposed of trip tank fluids, Prep for rig move
Rig released ~ 19:00 hrs on 2/3/2006
PRE Hold PJSM And ATP With Production -Prepare And Move Rig
Off NS-11 To The South And Position On Pad
PRE Secure Rig And Shut Down The Moving System -Remove The
Well Houses On NS-13 And On NS-15 -Spot Tree Stand In
Cellar Area For NS-14
PRE Hold PJSM And ATP W ith Production -Move Rig To The North
And Position On Pad
PRE Install Flow Lines On NS-11
Tested Choke manifold to 250/5000 psi for 5 min. GOOD TEST
Clean area around NS11. Perform general maintenence
PRE Hold PJSM And ATP With Production -Move Rig Over NS-14
PRE Move Rig over NS14.
PRE Leveling the rig and berming.
Prepare cellar.
PRE R/U and test injection lines in G&I.
04:00 - 05:00 1.00 RIGU P DECOMP
05:00 - 06:00 1.00 RIGU P DECOMP
06:00 - 07:00 1.00 RIGU P DECOMP
07:00 - 08:00 1.00 RIGU P DECOMP
08:00 - 08:30 0.50 RIGU P DECOMP
08:30 - 09:30 1.00 RIGU P DECOMP
09:30 - 14:30 5.00 RIGU P DECOMP
14:30 - 15:30 1.00 RIGU P DECOMP
15:30 - 16:00 0.50 RIGU N WAIT DECOMP
16:00 - 18:00 2.00 RIGU P DECOMP
18:00 - 18:30 0.50 BOPSU P DECOMP
18:30 - 21:00 2.50 BOPSU P DECOMP
Accepted Rig For Well Work On NS-14 At 20:00 Hrs. 05-12-06
Due To Stand By Time Spent Installing Flow Lines On NS-11
R/U circulating lines to production tree.
PJSM Circulate Diesel FP.
Blow Down Surface Lines, R/D from Displacement
N/D Tree Install Dart Plug.
N/U Drilling Spool.
Rig Up To Pick Up BOPS, PJSM, Pick up BOPs.
N/U BOPE, Load Pipe Shed, Take On 9.3 Brine to Pits.
Change Rams to 2 7/8" x 5" on Lower Pipe Rams.
Power Outage on the Island. Switch to Rig Power.
Install Riser to BOP Stack.
Function Test Rams and Fill BOP Stack With Water.
Test BOPE to 250 psi Low and 3,500 psi High Pressure for
Printed: 5/22/2006 11:56:32 AM
BP EXPLORATION Page 14 of 17
Operations Summary Report
Legal Well
Common W
Event Nam
Contractor
Rig Name:
Date ~~ Name:
ell Name:
e:
Name:
From - To NS14
NS14
REENTE
NABOB
NABOB
Hours
R+COM
S ALASK
S 33E
Task ~'j
PLET
A DRI
Code i
E
LLING
NPT
Start
I Rig
Rig
Phase
Spud Date: 1/8/2002
: 12/28/2005 End:
Release: 5/21/2006
Number: 33E
Description of Operations
5/13/2006 18:30 - 21:00 2.50 BOPSU P DECOMP Annular, 250 psi Low and 5,000 psi High Pressure for Rams,
Valves and Choke Manifold. AOGCC Witness of BOP Test
Waived By Chuck Scheve. Test Witnessed by WSL and
Nabors Toolpusher.
21:00 - 22:00 1.00 BOPSU P DECOMP While rigging up 5" Test jt to Test Dart, Test Dart Unseated,
Pulled to Rig Floor and Changed O-Ring and Made it Back Up.
22:00 - 23:00 1.00 BOPSU P DECOMP Continued to Test 5" Rams and Annular.
23:00 - 00:00 1.00 BOPSU P DECOMP B/D and UD BOP Test Equipment.
5/14/2006 00:00 - 01:00 1.00 PULL P DECOMP R/U to Pull Hanger to Rig Floor. R/U Casing Equipment.
01:00 - 02:30 1.50 PULL P DECOMP Pull Hanger to Rig Floor.
02:30 - 03:30 1.00 PULL P DECOMP UD Hanger, R/D Test Jt, C/O Elevators.
03:30 - 04:30 1.00 PULL P DECOMP UD 4.5" Tubing.
04:30 - 05:00 0.50 CLEAN P CLEAN Clear and Clean Rig Floor.
05:00 - 06:00 1.00 PULL P DECOMP UD Dart Valve, TIW Valve Test, C/O Handling Equipment to
P/U BHA #1.
06:00 - 07:30 1.50 RIGU P RUNCMP Cut and Slip Drilling Line
Lubricate and service top drive
07:30 - 09:00 1.50 RIGU P RUNCMP Bring 2-7/8" handling tools to floor.
R/U and prepare to RIH
09:00 - 12:00 3.00 CLEAN P CLEAN M/U BHA#7 for Cleanout Run. RIH
12:00 - 14:30 2.50 CLEAN P CLEAN RIH w/ 1866' of 2-7/8" PAC DP to -1935'
RD/2-7/8" handling equipment and RU 4" Equipment
14:30 - 16:30 2.00 CLEAN P CLEAN RIH w/ 2269' of 4" to -4205'
Fill DP per Directional Driller at 145 gpm. 1750 psi
16:30 - 17:00 0.50 CLEAN P CLEAN Full Island Muster. Rig Team Muster in Doghouse. Headcount
complete and relayed to control room.
Stand Down.
17:00 - 23:00 6.00 CLEAN CLEAN B/D top drive and mudline.
TIH w/5" DP. Fill every 30 stands.
23:00 - 00:00 1.00 EVAL P OTHCMP MAD PASS f/12440' U12570' @360fph per SLB
145 gpm, 1730 psi, no motor-work, no fluctuation on weight
indicator.
5/15/2006 00:00 - 08:00 8.00 EVAL P OTHCMP Continue MAD Pass from 12570' to 13342' X720 fph
MAD Pass 13342' to 14149' - 360 fph
Complete loading pipe shed w/ tubing for completion.
Complete MAD pass.
08:00 - 10:30 2.50 BUNCO P RUNCMP Circulate 4 X 4-1/2" Liner Volumes @ 145 gpm, 1730 psi.
Spot 40 bbl of 100K LSRV Solids Free Perf Pill @ 14141'
B/D Lines and monitor well
10:30 - 14:00 3.50 BUNCO P RUNCMP POOH f/14141' V12251' and drop ball to open circ. sub.
Shear circ. sub open X2500 psi, wash TOL f~260 gpm, 2000
psi.
Circulate till returns clear up - 700 bbl total
14:00 - 19:00 5.00 BUNCO RUNCMP Pump -1 hole volume seawater
-50 bbl caustic wash
-50 bbl surfactant wash (Safe-Surf W)
-124 bbl Hi Vis spacer followed by 300 bbl seawater
19:00 - 21:00 2.00 BUNCO RUNCMP Displace well to CLEAN 9.3 ppg brine w/2% KCI at 6.2 bpm.
Final NTU readings:78, 76, & 74.
21:00 - 00:00 3.00 BUNCO RUNCMP B/D Top Drive and Lines
POOH racking back 5" DP f/12220' to 7030'
5/16/2006 00:00 - 02:00 2.00 BUNCO P RUNCMP POOH w/5" DP
02:00 - 04:00 2.00 BUNCO P RUNCMP C/O handling equipment to 4" DP
Printed: 5/22/2006 11:56:32 AM
BP EXPLORATION Page 15 of 17
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date From - To
__
5/16/2006 02:00 - 04:00
04:00 - 04:30
04:30 - 05:30
05:30 - 06:30
06:30 - 07:30
07:30 - 09:00
09:00 - 12:30
12:30 - 13:30
13:30 - 15:00
15:00 - 18:00
18:00 - 19:00
19:00 - 21:30
21:30 - 22:00
22:00 - 22:30
22:30 - 00:00
5/17/2006
00:00 - 01:00
01:00 - 05:30
05:30 - 07:30
07:30 - 10:00
10:00 - 13:00
13:00 - 13:30
13:30 - 14:30
14:30 - 19:00
19:00 - 19:30
19:30 - 20:30
20:30 - 00:00
5/18/2006 00:00 - 01:00
01:00 - 03:00
03:00 - 09:00
NS14
NS14
REENTE
NABOB
NABOB
Hours
--
R+COM
S ALASK
S 33E
Task ~
PLET
A DRI
Code
~
E
LLING
NPT j
E
Start
I Rig
Rig
Phase !
Spud Date: 1/8/2002
: 12/28/2005 End:
Release: 5/21/2006
Number: 33E
Description of Operations
2.00
BUNCO -
P - -_
RUNCMP
POOH w/4" DP, LD casing scraper
0.50 BUNCO P RUNCMP Break out & Lay down cross overs
C/O handling equipment to 2-7/8"
1.00 BUNCO RUNCMP Lay down 30 joints of 2 7/8" DP
1.00 BUNCO RUNCMP POOH w/ remainder of 2 7/8" DP
1.00 BUNCO P RUNCMP LD MWD, motor & mill
1.50 BUNCO P RUNCMP Pressure test 9 5/8" casing, 7" liner & 4 1/2" liner to 3700 psi
for 30 min
3.50 BUNCO P RUNCMP PJSM for running perforating equipment
PU 950' of TCP guns
2 7/8" SLB 2906 Powerjets HMX, 6 SPF, 60 degree phasing
PU & assemble perforating firing head
1.00 BUNCO RUNCMP RIH w/ 2 7/8" PAC DP
1.50 BUNCO RUNCMP MU cross overs
RIH w/ 4" DP
3.00 BUNCO RUNCMP RIH w/ 5" DP
1.00 BUNCO RUNCMP Verify pert guns are on depth
PJSM before beginning perforating operations
2.50 PERFO P OTHCMP Perforate well from 13,190' to 14,140'
950' total interval perforated (5436 charges)
2 7/8" PJ 2906, 6 SPF, 60 degree phasing
0.50 BUNCO P RUNCMP Monitor well, very slight loss 1/4 bbl in 1/2 hour
0.50 BUNCO P RUNCMP POH from 14,140' to 13,169'
1.50 BUNCO RUNCMP Circulate BU @ 13,169'
DPP 2650 psi @ 350 GPM
No gas seen at surface
1.00 BUNCO RUNCMP Monitor well, Pump dry job
4.50 BUNCO RUNCMP TOH w/ 5" DP
2.00 BUNCO RUNCMP LD 4" DP
2.50 BUNCO RUNCMP LD 2 7/8" DP
3.00 BUNCO RUNCMP LD Perf Guns, All shots fired
0.50 BUNCO P RUNCMP Clear & clean rig floor of all tools & equipment
1.00 BUNCO P RUNCMP PJSM, RU slickline unit to run gauge ring
4.50 BUNCO P RUNCMP Run 5.99" gauge ring & junk basket to 12,250'
No debris in junk basket
RD wireline equipment
0.50 BUNCO P RUNCMP PJSM w/ all personnel associated w/ running completion
equipment
Discussed RU & Sim Ops hazards & the need for excellent
communication
1.00 BUNCO RUNCMP Pull wear bushing
Move completion equipment to rig floor
3.50 BUNCO RUNCMP RU equipment to run 4 1/2" tubing & tools
Well taking 6 to 8 BPH of 9.3 ppg brine
1.00 BUNCO P RUNCMP Run WLEG, Packer, Profile nipples, Weatherford pressure
gauge
Baker Lock all connections below packer
Torque Turn all connections
2.00 BUNCO RUNCMP Test fiber optics cable for signal, OK
Pressure test Weatherford downhole gauge
Test to 7500 psi - 15 min, 500 psi 5 min
Tie-in to mandrel and repeat test, Test OK
6.00 BUNCO RUNCMP Run 4.5", 12.6#, 13Cr80, Vam Top Tubing
Printed: 5/22/2006 11:56:32 AM
BP EXPLORATION
Page 16 of 17
Operations Summary Report
Legal Well Name: NS14
Common Well Name: NS14
Event Name: REENTER+COMPLETE
Contractor Name: NABOBS ALASKA DRILLING
Rig Name: NABOBS 33E
Date From - To Hours ~ Task ~ Code NPT
~_ _ - ---
5/18/2006 03:00 - 09:00 6.00
09:00 - 10:00 1.00 BUNCO SFAL
10:00 - 20:00 10.00 BUNCO P
20:00 - 20:30 0.50 BUNCO P
20:30 - 00:00 I 3.50
5/19/2006 00:00 - 01:00 1.00
01:00 - 01:30 0.50
01:30 - 05:00 3.50
05:00 - 06:30 1.50
06:30 - 08:30 2.00
08:30 - 09:00 0.50
09:00 - 11:00 2.00
11:00 - 12:00 1.00
12:00 - 14:30 2.50
14:30 - 00:00 9.50
5/20/2006 100:00 - 01:00 I 1.00
01:00 - 02:00 1.00
02:00 - 06:30 4.50
06:30 - 16:30 ~ 1.0.00
16:30 - 19:00 I 2.50
19:00 - 21:30 2.50
21:30 - 22:30 1.00
22:30 - 00:00 1.50
5/21 /2006 00:00 - 03:00 3.00
03:00 - 07:30 4.50
07:30 - 10:30 I 3.00
10:30 - 16:00 I 5.50
Spud Date: 1/8/2002
Start: 12/28/2005 End:
I Rig Release: 5/21/2006
Rig Number: 33E
Phase Description of Operations
RUNCMP Torque Turn every joint, make up torque 4450 ft Ibs
Record down weight every 500'
RUNCMP Make up tongs failed, replace with standby set
RUNCMP Run 4.5", 12.6#, 13Cr80, Vam Top Tubing
RUNCMP PJSM, Check for ice formation in derrick
Clear small amount of ice from derrick & wind walls
RUNCMP Run 4.5", 12.6#, 13Cr80, Vam Top Tubing
Depth @ 00:00 Hrs - 10,957'
RUNCMP Run 4.5" Production Tubing
RUNCMP Connect SSSV control line
Test control line to 6000 psi for 15 min.
RUNCMP Run 4.5" Production Tubing
RUNCMP Space out tubing string
RUNCMP Splice fiber optics line
RUNCMP Land tubing hanger w/ 170K on hanger
RUNCMP Drop ball to test tubing
Test tubing hanger to 5000 psi for 10 min.
Test tubing to 4200 psi for 30 min.
RUNCMP Clear & clean rig floor
RUNCMP RU slickline equipment
RUNCMP Wireline work
Run #1 -RIH, retrieve ball & rod
Run #2 -RIH, retrieve RHC ball seat from x-nipple
Run #3 -RIH, pull CCL memory log from 12,381' to 11,882'
RUNCMP Wireline work
Run #3 -Memory Log, Download & Evaluate Space Out, OK
RUNCMP RU head pin on landing joint to circulate
RUNCMP Reverse circulate well with 9.3 ppg brine
Pump @ 3 BPM - 150 psi
Spot inhibited brine from packer to 1000' above gas lift mandrel
RUNCMP Wireline work
Run #1 -RIH w/ PXN plug to set in XN-nipple, could not set
plug, POH, redress plug and M/U knuckle joint
Run #2 - RIH w/ redressed PXN plug, PXN plug set in XN
profile nipple
Run #3 -RIH set JD prong in PXN plug
RUNCMP Pressure tbg to 4200 psi and hold for 30 min to set packer
Bleed tubing pressure to 2700 psi, Pressure IA to 4200 psi and
hold for 30 min, OK
Bleed tubing pressure to shear DCR Valve, DCR sheared with
1700 psi on tubing(2500 psi differential)
Bleed tubing & IA to 0 psi -Blow down all lines
RUNCMP RD & clear all equipment from rig floor
RUNCMP PJSM, Pull landing joint, Set TWC
RUNCMP ND BOPE, Pull riser, disconnect lines
RUNCMP ND BOPE and secure in cradle
RUNCMP Terminate SSSV control line
Final tie-in for fiber optic cable
RUNCMP NU production tree, Test wellhead to 5000 psi for 15 min, Test
OK
Test hanger void to 5000 psi for 10 min, Test OK
RUNCMP Freeze Protect -Pump 242 bbls of heated diesel w/ corrosion
inhibitor down the IA
Printed: 5/22/2006 11:56:32 AM
Printed: 5/22/2006 11:56:32 AM
TREE: ABB-VGI 5 1/8" 5ksi ~ N S 14A s oTES:
WELLHEAD: ABB-VGI 13-5/8" f!'OtY1 C}RLt.~ fl FT
Multibowl 5ksi
ORIGINAL KB. ELEV = 55.9`
KB-BF. ELEV = 40.2`
CB. ELEV = 16.0' 13 3/8" TAM Port Collar 4-1/2" SSSV 1027'
13-3/8" 68# L-80 BTC
@ 3297`TMD
9-5/8" Window Cut @10181`
4-112" X Nipple @ 12159` MD
4-1/2" Cidra Gauge @ 12180' MD
7" PACKER,13 Cr @ 12203` MD
4-1/2" X Nipple @ 12226` MD
4-1/2" XN Nipple @ 12238' MD
~ 4.5" LINER TOP @ 12251' MD
7", 26#/ft L-80, Hydril 521
@ 12383'
GAS LIFT MANDRELS
ST MD ND DEV TYPE VLV LATCH PORT DATE
1 4935 4495 39 RK SO MMGW 16 05/25/06
7" LINER TOP @ 10028` MD
7" LINER TOP @ 10741` MD
9-5/8 47# L-80 BTC
@ 10908`TMD
ECP @ 12957 & 12841'
4.5" Tubing cut @ 11806`
Top of Cement @ 11832'
4.5", 12.6#, 13Cr Vam Top
@14230` TMD
7" PACKER,13 Cr @ 12491` MD
4.5" LINER TOP @ 12319` MD
7", 26#/ft L-80, BTC-M
@ 12471 `
PERFORATION SUMMARY
REF LOG: TUBING CONVEYED
ANGLE AT TOP PERF: 89 @ 13190'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-7/8" 6 13190 - 14140 O 05130/06
PBTD @ 12931' MD
TD @ 13018' MD
4.5", 12.6#, 13Cr Vam Ace
DATE REV BY COMMENTS DATE REV BY COMMENTS
12!07/05 DAJ Proposed Completion
03!29106 DAJ Revised Liner Tops
05/21/06 N33E SIDETRACK (NS14A)
05/25/06 DTR/PJC GLV CIO
06/21/06 ROY/TLH PERF BOX ADDED
Northstar
WELL: NS14 Sidetrack
API No: 50-029-23026-00
BP Exploration {Alaska}
Printed: 2/6/2006 1:31:22 PM
by
'~ .. _ .. _ .. ~ Schlumaerger
roa-i4~- purvey Repvri
Report Date: 30,1an-06 Survey I DLS Computation Method: Minimum Curvature / Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 98.120°
Field: Northstar Vertical Section Origin: N 0.000 ft, E 0.000 ft
Structure 1 Slot: Northstar PF I NS14 TVD Reference Datum: Rotary Table
well: NS14 TVD Reference Elevation: 56.54 ft relative to MSL
Borehole: NS14A Sea Bed I Ground Level Elevation: 15.57 ft relative to MSL
UWIIAPI#: 500292302301 Magnetic Declination: 24.740°
Survey Name 1 Date: NS14A 1 January 30, 2006 Total Field Strength: 57616.002 nT
Tort 1 AHD 1 DDI 1 ERD ratio: 271.645° / 6891.96 ft 16.37810.618 Magnetic Dip: 81.019°
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: January 17, 2006
Location LatlLong: N 70 29 27.977, W 148 4135.865 Magnetic Declination Model: BGGM 2005
Location Grid NIE YIX: N 6030951.560 ftUS, E 659830.670 ftUS North Reference: True North
Grid Convergence Angle: +1.23170967° Total Corr Mag North •> True North: +24.740°
Grid Scale Factor: 0.99992902 Local Coordinates Referenced To: Well Head
•
Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
k de de ft k k k h ft k de 1100 k ftUS ftUS
rrolecteo-up u.uu
RTE 1.03
First GYD-GC-SS 51.03
101.03
151.03
201.03
296.03
376.03
454:03
546.03
C
~-~
r
636.03
726.03
821.03
911.03
1006.03
1099.03
1196.03
1291.03
1386.03
1481.03
1576.03
1668.03
1766.03
1861.03
U.UV
0.00
0.30
0.39
0.65
1.18
1.65
1.75
2.20
2.06
1.99
1.36
1.78
2.24
2.47
U.UV
0.00
24.52
13.11
12.61
3.63
78.78
76.40
74.43
75.02
74.55
79.39
74.79
70.11
71.40
2.19 71.14
2.05 73.17
2.01 74.20
1.60 74.96
1.53 79.22
0.63 35.96
1.28 303.69
1.33 305.36
2.32 299.62
SurveyEditor Ver SP 1.0 Bld( doc4Ox_56 )
-UU.O'i
-55.51
-5.51
44.49
94.49
144.48
239.46
319.42
397.38
489.31
579.26
669.22
764.18
854.13
949.05
1041.97
1138.90
1233.84
1328.80
1423.76
1518.74
1610.73
1708.71
1803.66
V.UV
1.03
51.03
101.03
151.03
201.02
296.00
375.96
453.92
545.85
635.80
725.76
820.72
910.67
1005.59
1098.51
1195.44
1290.38
1385.34
1480.30
1575.28
1667.27
1765.25
1860.20
U.VU
0.00
0.04
0.09
0.13
0.11
1.32
3.54
6.02
9.16
12.08
14.52
16.95
19.78
23.25
26.62
29.85
32.91
35.65
38.07
39.52
38.83
36.83
34.06
V.VU
0.00
0.13
0.43
0.88
1.68
3.72
6.09
8.78
12.20
15.38
18.01
20.61
23.76
27.67
31.45
35.04
38.40
41.39
43.99
45.71
46.97
49.20
52.22
U.VV
0.00
0.13
0.43
0.88
1.67
3.37
5.29
7.81
11.13
14.27
16.86
19.43
22.58
26.48
30.26
33.84
37.20
40.19
42.77
44.45
44.26
43.02
41.35
N S 14\N S 14\N S 14A\N S 14A
V.VV V.VV V.VV VVJVJJ I.JV VV.~VJV.VI IY IV GJ LI .J11 vv i~V t~ W.VVV
0.00 0.00 0.00 6030951.56 659830.67 N 70 29 27.977 W 148 41 35.865
0.12 0.05 0.60 6030951.68 659830.72 N 70 29 27.979 W 148 41 35.864
0.40 0.15 0.23 6030951.97 659830.81 N 70 29 27.981 W 148 41 35.861
0.85 0.25 0.52 6030952.41 659830.90 N 70 29 27.986 W 148 41 35.858
1.64 0.34 1.09 6030953.20 659830.98 N 70 29 27.993 W 148 41 35.855
2.88 1.75 1.86 6030954.48 659832.35 N 70 29 28.006 W 148 41 35.814
3.39 4.06 0.15 6030955.04 659834.66 N 70 29 28.011 W 148 41 35.746
4.07 6.66 0.58 6030955.77 659837.24 N 70 29 28.017 W 148 41 35.669
4.97 9.96 0.15 6030956.75 659840.52 N 70 29 28.026 W 148 41 35.572
5.81 13.03 0.08 6030957.65 659843.57 N 70 29 28.035 W 148 41 35.482
6.42 15.59 0.72 6030958.31 659846.11 N 70 29 28.041 W 148 41 3
7.02
18.12
0.46
6030958.96
659848.63
N 70 29 28.046 W 148 41 3
~
7.98 21.12 0.54 6030959.99 659851.61 N 70 29 28.056 W 148 41 35. 44
9.27 24.81 0.25 6030961.36 659855.27 N 70 29 28.069 W 148 41 35.135
10.48 28.39 0.30 6030962.65 659858.82 N 70 29 28.080 W 148 41 35.030
11.58 31.80 0.16 6030963.82 659862.21 N 70 29 28.091 W 148 41 34.929
12.53 35.03 0.06 6030964.84 659865.42 N 70 29 28.101 W 148 41 34.834
13.32 37.92 0.43 6030965.70 659868.29 N 70 29 28.108 W 148 41 34.749
13.91 40.44 0.14 6030966.33 659870.80 N 70 29 28.114 W 148 41 34.675
14.57 41.99 1.22 6030967.02 659872.34 N 70 29 28.121 W 148 41 34.629
15.54 41.44 1.57 6030967.99 659871.76 N 70 29 28.130 W 148 41 34.646
16.81 39.60 0.06 6030969.22 659869.89 N 70 29 28.143 W 148 41 34.700
18.40 37.03 1.06 6030970.75 659867.29 N 70 29 28.158 W 148 41 34.775
Generated 3/16/2006 3:40 PM Page 1 of 6
Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft k ft ft ft ft ft de 1100 ft ftUS ftUS
Last GYD-GC-SS
First MWD+Sag
1 ybb.U3
2051.03
2146.03
2241.03
2336.03
2431.03
2526.03
2550.03
2621.03
2647.79
2741.98
2837.13
2930.45
3025.98
3117.48
3211.81
3244.17
3410.22
3506.72
3600.69
3693.35
3789.81
3884.98
3979.61
4075.10
4169.09
4264.25
4361.70
4458.07
4554.70
4648.39
4742.93
4838.88
4932.75
5028.89
5123.14
5219.14
5311.95
5409.68
5504.49
5598.88
3.LU L`J4.Uy l8`JO.00
3.43
4.49
6.62
9.47
12.58
16.01
16.42
18.28
19.52
21.84
23.56
26.17
28.94
31.52
33.92
294.90
300.59
302.08
303.45
302.42
302.18
302.65
301.66
301.01
297.51
296.52
297.80
297.79
299.35
299.01
1993.39
2088.16
2182.71
2276.77
2370.00
2462.05
2485.09
2552.86
2578.17
2666.29
2754.07
2838.73
2923.42
3002.47
3081.83
34.63
34.81
35.87
37.20
39.11
39.30
38.76
38.20
37.49
38.88
39.16
38.90
38.96
39.15
39.54
39.38
38.95
39.14
38.66
38.46
38.23
38.02
38.05
38.23
38.42
298.45
297.54
296.26
294.81
293.81
294.22
294.72
293.50
294.05
294.27
294.59
294.22
294.00
293.78
295.58
295.79
295.00
295.50
297.78
297.37
298.87
297.94
297.86
298.32
298.62
3108.57
3245.05
3323.77
3399.27
3472.13
3546.88
3620.81
3694.89
3770.29
3844.17
3918.10
3993.80
4068.77
4143.81
4216.26
4289.26
4363.65
4436.55
4511.38
4585.08
4660.37
4733.38
4810.36
4884.93
4958.97
iaaa.va cy.~c
2049.93 24.45
2144.70 18.29
2239.25 9.85
2333.31 -2.22
2426.54 -18.72
2518.59 -40.11
2541.63 -46.22
2609.40 -65.56
2634.71 -73.53
2722.83 -104.56
2810.61 -139.30
2895.27 -176.38
2979.96 -217.99
3059.01 -261.14
3138.37 -308.72
3165.11 -325.78
3301.59 -414.72
3380.31 -467.56
3455.81 -520.94
3528.67 -575.91
3603.42 -634.55
3677.35 -692.06
3751.43 -748.66
3826.83 -805.07
3900.71 -860.91
3974.64 -918.41
4050.34 -977.32
4125.31 -1035.53
4200.35 -1094.12
4272.80 -1151.05
4345.80 -1208.33
4420.19 -1266.20
4493.09 -1322.70
4567.92 -1379.94
4641.62 -1435.34
4716.91 -1491.30
4789.92 -1545.04
4866.90 -1601.71
4941.47 -1656.74
5015.51 -1711.62
JV.l.7
62.29
68.84
78.04
91.33
109.50
132.95
139.65
160.82
169.49
202.74
239.46
278.69
322.88
368.94
419.93
438.15
532.73
588.54
644.48
701.72
762.69
822.62
881.50
940.09
998.19
1058.11
1119.47
1180.03
1240.91
1300.31
1360.39
1420.99
1480.12
1540.49
1599.24
1658.79
1716.09
1776.30
1834.86
1893.39
JV.I V
36.00
34.01
33.78
37.95
49.19
68.15
74.05
93.36
101.44
132.76
167.88
206.05
249.51
295.13
345.81
363.94
458.01
513.52
569.08
625.87
686.41
746.03
804.62
862.92
920.81
980.55
1041.76
1102.16
1162.88
1222.19
1282.23
1342.78
1401.87
1462.23
1520.97
1580.52
1637.81
1698.03
1756.58
1815.10
GV.~J
22.71 JG.J-'
27.94 v.V.
0.25 vvvv.i. c.vv
6030974.86 vV.ivvv. ~v
659858.11 ~~.v ~v ..v.....
N 70 29 28.201 .. ... .. ..........
W 148 41 35.043
25.80 22.16 1.19 6030977.83 659852.27 N 70 29 28.231 W 148 41 35.213
30.60 14.32 2.25 6030982.46 659844.32 N 70 29 28.278 W 148 41 35.444
37.82 3.15 3.01 6030989.43 659833.01 N 70 29 28.349 W 148 41 35.772
47.67 -12.10 3.28 6030998.96 659817.54 N 70 29 28.446 W 148 41 36.221
60.20 -31.93 3.61 6031011.06 659797.45 N 70 29 28.569 W 148 41 36.805
63.79 -37.59 1.79 6031014.53 659791.72 N 70 29 28.605 W 148 41 36.971
75.05 -55.52 2.65 6031025.40 659773.56 N 70 29 28.716 W 148 41 37.499
79.56 -62.92 4.70 6031029.74 659766.06 N 70 29 28.760 W 148 41 37.717
95.76 -91.95 2.79 6031045.32 659736.69 N 70 29 28.919 W 148 41 38.571
112.43 -124.67 1.85 6031061.28 659703.62 N 70 29 29.083 W 148 41 3~
130.36 -159.57 2.86 6031078.45 659668.35 N 70 29 29.259 W 148 41 40.5 1
150.96 -198.66 2.90 6031098.21 659628.83 N 70 29 29.462 W 148 41 41.711
173.01 -239.10 2.95 6031119.38 659587.93 N 70 29 29.679 W 148 41 42.901
197.87 -283.61 2.55 6031143.27 659542.89 N 70 29 29.923 W 148 41 44.211
206.63 -299.59 2.40 6031151.68 659526.73 N 70 29 30.009 W 148 41 44.681
251.02 -383.10 0.33 6031194.27 659442.29 N 70 29 30.446 W 148 41 47.139
276.26 -432.88 1.34 6031218.43 659391.98 N 70 29 30.694 W 148 41 48.604
300.36 -483.36 1.69 6031241.44 659341.00 N 70 29 30.931 W 148 41 50.089
323.92 -535.53 2.17 6031263.87 659288.34 N 70 29 31.163 W 148 41 51.625
348.73 -591.22 0.33 6031287.48 659232.13 N 70 29 31.407 W 148 41 53.264
373.56 -645.77 0.66 6031311.12 659177.07 N 70 29 31.651 W 148 41 54.869
397.61 -699.51 1.00 6031334.02 659122.82 N 70 29 31.887 W 148 41 56.451
421.23 -753.13 0.82 6031356.47 659068.72 N 70 29 32.120 W 148 41 58.029
445.01 -806.14 1.49 6031379.11 659015.21 N 70 29 32.354 W 148 41 59.589
469.79 -860.69 0.36 6031402.71 658960.15 N 70 29 32.597 W 148 42 1.194
495.15 -916.57 0.36 6031426.85 658903.74 N 70 29 32.846 W 148 42 2.839
519.88 -971.84 0.16 6031450.39 658847.95 N 70 29 33.090 W 148 42 4.466
544.54 -1027.51 0.24 6031473.85 658791.77 N 70 29 33.332 W 148 42
569.34 -1081.48 1.29 6031497.48 658737.28 N 70 29 33.576 W 148 42
595.38 -1135.62 0.22 6031522.35 658682.59 N 70 29 33.832 W 148 42 9.286
621.37 -1190.36 0.69 6031547.16 658627.31 N 70 29 34.087 W 148 42 10.897
646.60 -1243.85 0.39 6031571.22 658573.30 N 70 29 34.335 W 148 42 12.471
673.66 -1297.80 1.57 6031597.12 658518.78 N 70 29 34.601 W 148 42 14.059
700.85 -1349.88 0.34 6031623.18 658466.14 N 70 29 34.869 W 148 42 15.592
728.92 -1402.40 1.00 6031650.11 658413.03 N 70 29 35.145 W 148 42 17.138
756.18 -1452.80 0.66 6031676.28 658362.06 N 70 29 35.413 W 148 42 18.621
784.35 -1506.02 0.06 6031703.30 658308.25 N 70 29 35.690 W 148 42 20.187
811.92 -1557.67 0.35 6031729.76 658256.02 N 70 29 35.961 W 148 42 21.708
839.83 -1609.13 0.28 6031756.54 658203.98 N 70 29 36.235 W 148 42 23.222
SurveyEditor Ver SP 1.0 Bld(doc40x_56) NS14\NS14\NS14A\NS14A Generated 3/16/2006 3:40 PM Page 2 of 6
Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de k ft ft k ft ft ft de 1100 k ftUS ftUS
0b`J4.1 l
5789.27
5884.31
5978.43
6076.30
6172.65
6267.28
6363.43
6454.69
6549.14
6644.99
6737.62
6832.86
6927.24
7022.11
7116.58
7212.18
7307.54
7403.02
7497.28
7592.30
7689.29
7784.34
7878.82
7973.56
8065.10
8162.96
8257.69
8352.72
8446.80
8540.23
8636.92
8732.35
8827.07
8922.98
9016.77
9111.39
9206.85
9303.79
9399.52
9493.02
9588.03
38.03
38.48
38.63
38.50
38.58
37.94
38.09
38.01
37.89
38.78
39.07
38.91
39.23
39.05
38.94
38.54
38.42
38.46
38.65
38.89
38.59
38.27
38.03
37.65
37.52
37.21
37.17
36.97
36.67
36.24
35.78
35.18
34.89
34.33
34.14
34.11
34.28
34.29
34.75
34.68
34.61
34.95
L`7/ .O I OUJJ.YO JV.7U.UL - I / V / .JG 1.7JG. I V I V I ~.t I Vvl .V ~ - I vv I.tv v..' ~ vvv ~ ~ vv.~v vvv ~.. ~. ~.. .. ... ~ .. ......... .. . ... .~ ~ ......
298.94 5107.89 5164.43 -1822.96 2012.01 1933.72 896.05 -1713.58 0.76 6031810.51 658098.35 N 70 29 36.788 W 148 42 26.297
299.40 5182.22 5238.76 -1878.24 2071.25 1992.93 924.92 -1765.30 0.34 6031838.26 658046.03 N 70 29 37.072 W 148 42 27.819
299.97 5255.81 5312.35 -1932.81 2129.92 2051.57 953.98 -1816.27 0.40 6031866.21 657994.44 N 70 29 37.357 W 148 42 29.319
301.40 5332.36 5388.90 -1989.12 2190.90 2112.46 985.10 -1868.71 0.91 6031896.19 657941.35 N 70 29 37.663 W 148 42 30.863
301.36 5408.02 5464.56 -2043.93 2250.56. 2172.01 1016.17 -1919.65 0.66 6031926.16 657889.76 N 70 29 37.969 W 148 42 32.362
301.81 5482.57 5539.11 -2097.39 2308.84 2230.17 1046.69 -1969.29 0.33 6031955.60 657839.48 N 70 29 38.269 W 148 42 33.824
301.43 5558.29 5614.83 -2151.74 2368.10 2289.32 1077.76 -2019.76 0.26 6031985.58 657788.36 N 70 29 38.574 W 148 42 35.309
301.54 5630.25 5686.79 -2203.26 2424.23 2345.35 1107.07 -2067.62 0.15 6032013.85 657739.89 N 70 29 38.862 W 148 42 36.718
300.05 5704.34 5760.88 -2257.31 2482.81 2403.87 1137.06 -2117.94 1.36 6032042.75 657688.93 N 70 29 39.157 W 148 42 38.199
299.80 5778.90 5835.44 -2313.23 2543.03 2464.06 1167.10 -2170.14 0.34 6032071.66 657636.11 N 70 29 39.452 W 148 42 39.736
299.81 5850.90 5907.44 -2367.38 2601.31 2522.32 1196.07 -2220.71 0.17 6032099.53 657584.93 N 70 29 39.737 W 148 42 4~
300.21 5924.84 5981.38 -2423.08 2661.34 2582.32 1226.09 -2272.69 0.43 6032128.43 657532.32 N 70 29 40.032 W 148 42 4
299.35 5998.05 6054.59 -2478.45 2720.91 2641.88 1255.68 -2324.39 0.61 6032156.90 657480.00 N 70 29 40.323 W 148 42 44.277
299.32 6071.78 6128.32 -2534.10 2780.61 2701.57 1284.93 -2376.43 0.12 6032185.02 657427.34 N 70 29 40.611 W 148 42 45.809
299.22 6145.47 6202.01 -2589.24 2839.73 2760.68 1313.83 -2428.00 0.43 6032212.80 657375.17 N 70 29 40.895 W 148 42 47.327
299.06 6220.30 6276.84 -2644.76 2899.21 2820.16 1342.80 -2479.96 0.16 6032240.64 657322.60 N 70 29 41.179 W 148 42 48.856
299.16 6294.99 6351.53 -2700.11 2958.50 2879.44 1371.64 -2531.76 0.08 6032268.36 657270.20 N 70 29 41.463 W 148 42 50.381
299.27 6369.66 6426.20 -2755.64 3018.01 2938.95 1400.68 -2583.70 0.21 6032296.28 657217.65 N 70 29 41.748 W 148 42 51.910
299.37 6443.15 6499.69 -2810.67 3077.03 2997.96 1429.59 -2635.16 0.26 6032324.07 657165.58 N 70 29 42.032 W 148 42 53.425
299.35 6517.27 6573.81 -2866.09 3136.49 3057.42 1458.74 -2686.98 0.32 6032352.10 657113.15 N 70 29 42.319 W 148 42 54.951
299.10 6593.25 6649.79 -2922.33 3196.78 3117.70 1488.18 -2739.60 0.37 6032380.40 657059.92 N 70 29 42.608 W 148 42 56.499
299.10 6667.99 6724.53 -2977.15 3255.49 3176.41 1516.73 -2790.90 0.25 6032407.84 657008.02 N 70 29 42.889 W 148 42 58.010
298.92 6742.61 6799.15 -3031.30 3313.45 3234.37 1544.84 -2841.59 0.42 6032434.85 656956.74 N 70 29 43.165 W 148 42 59.502
297.64 6817.68 6874.22 -3085.54 3371.24 3292.15 1572.22 -2892.47 0.84 6032461.13 656905.28 N 70 29 43.434 W 148 43 1.000
296.96 6890.44 6946.98 -3138.01 3426.79 3347.69 1597.70 -2941.84 0.56 6032485.54 656855.39 N 70 29 43.685 W 148 43 2.453
295.61 6968.40 7024.94 -3194.21 3485.94 3406.80 1623.89 -2994.87 0.83 6032510.59 656801.81 N 70 29 43.942 W 148 43 4.014
293.95 7043.99 7100.53 -3248.92 3543.04 3463.78 1647.82 -3046.71 1.08 6032533.40 656749.47 N 70 29 44.177 W 148 43 5.541
293.69 7120.06 7176.60 -3303.74 3599.99 3520.55 1670.83 -3098.81 0.36 6032555.27 656696.89 N 70 29 44.403 W 148 43 7.074
291.96 7195.73 7252.27 -3357.81 3655.89 3576.19 1692.51 -3150.33 1.18 6032575.84 656644.92 N 70 29 44.616 W 148 43 8. 1
~
291.61 7271.31 7327.85 -3411.18 3710.82 3630.78 1712.90 -3201.33 0.54 6032595.13 656593.49 N 70 29 44.816 W 148 43 1
292.19 7350.05 7406.59 -3465.69 3766.94 3686.57 1733.83 -3253.41 0.71 6032614.93 656540.99 N 70 29 45.022 W 148 43 11.625
290.19 7428.19 7484.73 -3519.04 3821.72 3740.96 1753.63 -3304.48 1.24 6032633.63 656489.50 N 70 29 45.217 W 148 43 13.129
289.32 7506.14 7562.68 -3571.74 3875.52 3794.22 1771.82 -3355.11 0.79 6032650.73 656438.50 N 70 29 45.395 W 148 43 14.619
288.55 7585.44 7641.98 -3624.73 3929.48 3847.54 1789.33 -3406.15 0.49 6032667.13 656387.10 N 70 29 45.567 W 148 43 16.122
287.07 7663.08 7719.62 -3676.60 3982.09 3899.37 1805.42 -3456.24 0.89 6032682.14 656336.68 N 70 29 45.725 W 148 43 17.597
286.59 7741.34 7797.88 -3729.16 4035.27 3951.63 1820.82 -3507.14 0.34 6032696.44 656285.46 N 70 29 45.876 W 148 43 19.095
285.17 7820.22 7876.76 -3782.44 4089.04 4004.33 1835.53 -3558.86 0.84 6032710.04 656233.44 N 70 29 46.021 W 148 43 20.617
285.26 7900.09 7956.63 -3836.95 4143.98 4058.06 1849.95 -3611.86 0.48 6032723.31 656180.14 N 70 29 46.162 W 148 43 22.178
283.91 7978.78 8035.32 -3891.12 4198.49 4111.30 1863.68 -3664.62 0.81 6032735.90 656127.10 N 70 29 46.297 W 148 43 23.731
282.06 8055.70 8112.24 -3944.08 4251.64 4162.89 1875.62 -3716.41 1.13 6032746.73 656075.07 N 70 29 46.414 W 148 43 25.256
280.33 8133.74 8190.28 -3998.19 4305.84 4215.11 1886.14 -3769.57 1.10 6032756.10 656021.70 N 70 29 46.518 W 148 43 26.821
SurveyEditor Ver SP 1.0 Bld( doc40x_56) NS14\NS14\NS14A\NS14A Generated 3/16/2006 3:40 PM Page 3 of 6
Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft ft k k ft ft ft de NOOft ftUS ftUS
~ n.l a onA cc OOOA on a ~c Cn40~C9 AA aa~oaa n~ ni ~n ~e da any \A/ ~dA d4 9R d'29
anoY. yV 34. OL L//.J/ OL IJ.LI OLVA./J -YV:7J.:J0 YJV I.LJ YLVI.ai ~VO~.VV -~VG~..~v i.~.l VVJLI VJ.T-r vvv.ivv.v~ ~. ~.. ~.. ~.......~ .. .... ... ~...~..~
9777. 08 34. 69 275.70 8288.95 8345.49 -4106.10 4413.78 4317.37 1900.64 -3876.50 1.04 6032768.30 655914.49 N 70 29 46.660 W 148 43 29.968
9873. 40 34. 50 273.42 8368.24 8424.78 -4160.67 4468.46 4368.28 1904.99 -3931.01 1.36 6032771.48 655859.91 N 70 29 46.702 W 148 43 31.573
9962. 37 35. 02 271.69 8441.33 8497.87 -4211.15 4519.18 4414.90 1907.25 -3981.68 1.25 6032772.64 655809.21 N 70 29 46.724 W 148 43 33.064
10061. 94 34. 95 268.54 8522.92 8579.46 -4267.67 4576.26 4466.49 1907.36 -4038.75 1.82 6032771.53 655752.15 N 70 29 46.725 W 148 43 34.744
10159. 40 34. 49 264.29 8603.04 8659.58 -4322.00 4631.76 4515.17 1903.91 -4094.13 2.53 6032766.89 655696.87 N 70 29 46.691 W 148 43 36.374
Tie-In Survey 10159. 40 34. 49 264.29 8603.04 8659.58 -4322.00 4631.76 4515.17 1903.91 -4094.13 0.00 6032766.89 655696.87 N 70 29 46.691 W 148 43 36.374
Top Window (Inc Only) 10181. 00 34. 25 263.45 8620.87 8677.41 -4333.82 4643.95 4525.61 1902.60 -4106.25 2.46 6032765.33 655684.77 N 70 29 46.678 W 148 43 36.731
Base Window (Inc Only) 10198.00 36.00 265.25 8634.77 8691.31 -4343.32 4653.73 4534.04 1901.64 -4115.98 11.96 6032764.16 655675.06 N 70 29 46.668 W 148 43 37.017
Inc+Trend 10238.72 34.09 267.90 8668.11 8724.65 -4366.22 4677.11 4554.65 1900.24 -4139.32 6.00 6032762.25 655651.77 N 70 29 46.654 W 148 43 37.704
Inc+Trend 10270.16 30.87 270.28 8694.63 8751.17 -4382.89 4693.99 4569.87 1899.95 -4156.19 11.02 6032761.60 655634.90 N 70 29 46.651 W 148 43 3~
Inc+Trend 10300.31 27.33 272.24 8720.97 8777.51 -4397.44 4708.65 4583.33 1900.26 -4170.85 12.16 6032761.59 655620.25 N 70 29 46.654 W 148 43 3~
Inc+Trend 10333.08 23.29 276.52 8750.59 8807.13 -4411.40 4722.65 4596.47 1901.29 -4184.81 13.53 6032762.32 655606.27 N 70 29 46.664 W 148 43 39.043
MWD+IFR+MS 10366.15 19.60 282.44 8781.37 8837.91 -4423.48 4734.73 4608.12 1903.23 -4196.73 12.92 6032764.00 655594.31 N 70 29 46.683 W 148 43 39.394
10394.36 16.86 286.11 8808.16 8864.70 -4432.25 4743.55 4616.80 1905.38 -4205.28 10.53 6032765.98 655585.72 N 70 29 46.705 W 148 43 39.646
10487.66 12.51 281.17 8898.39 8954.93 -4455.75 4767.18 4640.04 1911.10 -4228.20 4.85 6032771.20 655562.68 N 70 29 46.761 W 148 43 40.320
10583.36 9.66 275.62 8992.30 9048.84 -4474.12 4785.57 4657.75 1913.89 -4246.37 3.18 6032773.60 655544.46 N 70 29 46.788 W 148 43 40.855
10677.73 10.19 269.18 9085.26 9141.80 -4490.28 4801.82 4672.81 1914.55 -4262.59 1.30 6032773.91 655528.22 N 70 29 46.794 W 148 43 41.333
10771.98 10.73 259.84 9177.95 9234.49 -4506.85 4818.89 4687.62 1912.88 -4279.57 1.89 6032771.87 655511.29 N 70 29 46.778 W 148 43 41.832
10868.51 8.56 250.25 9273.12 9329.66 -4521.74 4835.03 4700.25 1908.87 -4295.18 2.79 6032767.53 655495.77 N 70 29 46.738 W 148 43 42.292
10964.11 6.62 233.47 9367.89 9424.43 -4531.95 4847.56 4708.11 1903.18 -4306.30 3.06 6032761.60 655484.77 N 70 29 46.682 W 148 43 42.619
11057.17 4.56 172.31 9460.57 9517.11 -4534.76 4855.83 4708.84 1896.32 -4310.12 6.40 6032754.66 655481.10 N 70 29 46.615 W 148 43 42.731
11153.68 6.65 115.77 9556.68 9613.22 -4528.38 4864.54 4701.25 1890.08 -4304.57 5.82 6032748.54 655486.78 N 70 29 46.554 W 148 43 42.568
11246.39 8.87 88.61 9648.57 9705.11 -4516.21 4876.83 4689.41 1887.92 -4292.59 4.56 6032746.64 655498.81 N 70 29 46.532 W 148 43 42.215
11342.01 10.21 90.49 9742.86 9799.40 -4500.54 4892.68 4674.95 1888.03 -4276.74 1.44 6032747.09 655514.65 N 70 29 46.534 W 148 43 41.749
11436.59 10.66 96.18 9835.88 9892.42 -4483.49 4909.80 4658.92 1887.01 -4259.66 1.19 6032746.44 655531.74 N 70 29 46.524 W 148 43 41.246
11533.47 12.02 101.91 9930.87 9987.41 -4464.47 4928.83 4640.52 1883.97 -4240.88 1.82 6032743.80 655550.58 N 70 29 46.494 W 148 43 40.693
11627.59 12.82 101.54 10022.79 10079.33 -4444.26 4949.07 4620.74 1879.85 -4221.06 0.85 6032740.12 655570.49 N 70 29 46.453 W 148 43 40.110
11720.82 13.79 98.11 10113.52 10170.06 -4422.83 4970.52 4599.95 1876.22 -4199.92 1.34 6032736.93 655591.69 N 70 29 46.418 W 148 43 3~
11814.63 15.14 93.69 10204.35 10260.89 -4399.43 4993.94 4577.72 1873.85 -4176.63 1.86 6032735.07 655615.03 N 70 29 46.395 W 148 43 3
11909.22 16.60 89.02 10295.34 10351.88 -4373.77 5019.80 4553.93 1873.29 -4150.79 2.05 6032735.06 655640.88 N 70 29 46.389 W 148 43 38.041
12004.71 18.21 84.55 10386.46 10443.00 -4345.80 5048.35 4528.66 1874.94 -4122.30 2.19 6032737.32 655669.33 N 70 29 46.406 W 148 43 37.203
12098.08 19.87 84.77 10474.72 10531.26 -4316.17 5078.81 4502.25 1877.77 -4091.97 1.78 6032740.81 655699.58 N 70 29 46.434 W 148 43 36.310
12193.01 21.44 83.89 10563.54 10620.08 -4283.66 5112.29 4473.38 1881.09 -4058.65 1.69 6032744.84 655732.82 N 70 29 46.466 W 148 43 35.329
12286.08 22.70 82.37 10649.79 10706.33 -4249.88 5147.26 4443.69 1885.28 -4023.94 1.49 6032749.78 655767.43 N 70 29 46.508 W 148 43 34.308
12299.29 22.81 82.63 10661.97 10718.51 -4244.96 5152.37 4439.38 1885.95 -4018.87 1.13 6032750.55 655772.48 N 70 29 46.514 W 148 43 34.158
12442.50 27.76 94.66 10791.51 10848.05 -4184.84 5213.33 4384.74 1886.80 -3958.02 4.97 6032752.71 655833.30 N 70 29 46.523 W 148 43 32.367
12475.11 30.99 99.16 10819.93 10876.47 -4168.86 5229.32 4369.58 1884.85 -3942.16 11.99 6032751.10 655849.20 N 70 29 46.504 W 148 43 31.900
12507.10 34.51 102.68 10846.83 10903.37 -4151.59 5246.62 4352.84 1881.55 -3925.18 12.51 6032748.17 655866.24 N 70 29 46.472 W 148 43 31.401
12537.51 37.99 103.92 10871.35 10927.89 -4133.69 5264.60 4335.28 1877.40 -3907.68 11.69 6032744.40 655883.82 N 70 29 46.431 W 148 43 30.886
12570.72 41.69 105.86 10896.85 10953.39 -4112.57 5285.87 4314.38 1871.92 -3887.13 11.75 6032739.36 655904.48 N 70 29 46.377 W 148 43 30.281
SurveyEditor Ver SP 1.0 Bld( doc40x 56) NS14\NS14\NS14A\NS14A Generated 3/16/2006 3:40 PM Page 4 of 6
Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft ft ft ft ft ft ft de 1700 ft ftUS ftUS
ILOU I.JU 44.44 IV/.O/ IV.71.7.J1 IVJI J.DI -YVJ 1./V
12631.22 48.08 109.64 10939.88 10996.42 -4070.70
12666.41 51.93 108.15 10962.49 11019.03 -4044.22
12697.62 55.65 110.87 10980.93 11037.47 -4019.55
12726.09 59.16 111.50 10996.26 11052.80 -3996.19
12761.68 63.14 112.89 11013.43 11069.97 -3965.96
12793.69 66.66 113.50 11027.01 11083.55 -3937.97
12821.94 68.51 113.36 11037.78 11094.32 -3912.79
12851.64 70.57 113.59 11048.16 11104.70 -3885.96
12884.57 73.67 113.29 11058.27 11114.81 -3855.73
12914.79 76.55 112.89 11066.04 11122.58 -3827.52
12947.26 78.07 112.05 11073.17 11129.71 -3796.84
12978.27 79.02 111.11 11079.33 11135.87 -3767.28
13008.91 81.65 109.38 11084.47 11141.01 -3737.75
13042:63 83.89 107.44 11088.72 11145.26 -3704.84
13074,56 87.61 107.80 11091.08 11147.62 -3673.44
13104.55 88.84 104.46 11092.01 11148.55 -3643.76
13139.23 89.72 102.96 11092.45 11148.99 -3609.25
13170.85 91.62 101.80 11092.08 11148.62 -3577.72
13199.78 92.10 101.16 11091.14 11147.68 -3548.86
13232.79 92.34 98.74 11089.86 11146.40 -3515.89
13264.63 92.46 98.79 11088.53 11145.07 -3484.08
13295.35 91.28 96.92 11087.52 11144.06 -3453.38
13333.27 89.69 93.78 11087.20 11143.74 -3415.51
13367.75 89.49 94.19 11087.45 11143.99 -3381.12
13401.09 90.44 93.21 11087.47 11144.01 -3347.88
13428.49 90.37 93.97 11087.28 11143.82 -3320.57
13462.43 90.07 90.99 11087.15 11143.69 -3286.80
13494.87 90.12 90.51 11087.09 11143.63 -3254.63
13525.70 89.91 91.17 11087.08 11143.62 -3224.04
13561.62 89.59 92.22 11087.24 11143.78 -3188.35
13589.97 89.42 92.28 11087.49 11144.03 -3160.15
13618.90 89.47 91.36 11087.77 11144.31 -3131.40
13652.57 89.23 91.88 11088.15 11144.69 -3097.94
13684.76 89.56 91.66 11088.49 11145.03 -3065.95
13715.95 89.70 91.91 11088.69 11145.23 -3034.96
13748.49 89.61 91.96 11088.88 11145.42 -3002.61
13780.03 89.77 91.26 11089.06 11145.60 -2971.27
13809.25 90.49 91.32 11088.99 11145.53 -2942.26
13841.17 90.47 91.04 11088.72 11145.26 -2910.57
13874.27 90.10 91.46 11088.56 11145.10 -2877.71
13905.28 89.78 91.45 11088.59 11145.13 -2846.91
5328.35
5355.30
5380.48
5404.46
5435.63
5464.61
5490.72
5518.55
5549.88
5579.09
5610.76
5641.15
5671.36
5704.81
5736.64
5766.62
5801.30
5832.91
5861.83
5894.81
5926.62
5957.33
5995.24
6029.72
6063.06
6090.46
6124.40
6156.84
6187.67
6223.59
6251.94
6280.87
6314.54
6346.72
6377.91
6410.45
6441.99
6471.21
6503.13
6536.23
6567.24
4272.31
4245.56
4220.54
4196.64
4165.54
4136.59
4110.50
4082.70
4051.39
4022.23
3990.62
3960.32
3930.27
3897.13
3865.65
3836.15
3802.33
3771.67
3743.76
3712.18
3681.96
3652.96
3617.79
3586.17
3555.71
3530.74
3500.14
3471.40
3444.11
3412.15
3386.86
3361.20
3331.46
3303.05
3275.59
3246.97
3219.39
3193.99
3166.34
3137.73
3110.96
1858.91 -3846.70
1850.19 -3821.20
1841.77 -3797.48
1833.10 -3775.12
1821.32 -3746.26
1809.90 -3719.62
1799.52 -3695.66
1788.44 -3670.14
1775.97 -3641.39
1764.52 -3614.53
1752.41 -3585.26
1741.24 -3557.00
1730.79 -3528.66
1720.22 -3496.92
1710.59 -3466.58
1702.26 -3437.79
1694.04 -3404.10
1687.26 -3373.22
1681.51 -3344.88
1675.81 -3312.40
1670.96 -3280.96
1666.77 -3250.54
1663.23 -3212.80
1660.84 -3178.40
1658.69 -3145.13
1656.97 -3117.78
1655.50 -3083.88
1655.08 -3051.44
1654.62 -3020.62
1653.56 -2984.71
1652.45 -2956.39
1651.53 -2927.47
1650.58 -2893.82
1649.58 -2861.65
1648.61 -2830.47
1647.51 -2797.95
1646.63 -2766.42
1645.97 -2737.21
1645.31 -2705.30
1644.59 -2672.21
1643.80 -2641.21
13.00 6032727.22 655945.18 N 70 29 46.249 W 148 43 29.090
11.41 6032719.05 655970.86 N 70 29 46.164 W 148 43 28.340
13.84 6032711.15 655994.76 N 70 29 46.081 W 148 43 27.641
12.47 6032702.96 656017.30 N 70 29 45.996 W 148 43 26.983
11.69 6032691.80 656046.40 N 70 29 45.880 W 148 43 26.133
11.13 6032680.96 656073.28 N 70 29 45.768 W 148 43 25.349
6.56 6032671.10 656097.45 N 70 29 45.666 W 148 43 24.644
6.97 6032660.57 656123.20 N 70 29 45.557 W 148 43 23.892
9.45 6032648.72 656152.21 N 70 29 45.435 W 148 43 23.046
9.62 6032637.85 656179.31 N 70 29 45.322 W 148 43 22.255
5.32 6032626.38 656208.84 N 70 29 45.203 W 148 43 2~
4.27 6032615.81 656237.33 N 70 29 45.094 W 148 43 20.561
10.23 6032605.98 656265.88 N 70 29 44.991 W 148 43 19.727
8.76 6032596.10 656297.84 N 70 29 44.887 W 148 43 18.793
11.70 6032587.12 656328.38 N 70 29 44.793 W 148 43 17.900
11.86 6032579.41 656357.34 N 70 29 44.711 W 148 43 17.052
5.01 6032571.92 656391.19 N 70 29 44.630 W 148 43 16.060
7.04 6032565.81 656422.21 N 70 29 44.564 W 148 43 15.151
2.76 6032560.66 656450.66 N 70 29 44.507 W 148 43 14.317
7.36 6032555.66 656483.26 N 70 29 44.451 W 148 43 13.361
0.41 6032551.49 656514.79 N 70 29 44.404 W 148 43 12.436
7.20 6032547.95 656545.29 N 70 29 44.363 W 148 43 11.540
9.28 6032545.23 656583.10 N 70 29 44.328 W 148 43 10.429
1.32 6032543.57 656617.54 N 70 29 44.305 W 148 43 9.417
4.09 6032542.14 656650.84 N 70 29 44.284 W 148 43 8.438
2.79 6032541.01 656678.22 N 70 29 44.267 W 148 43 7.633
8.82 6032540.27 656712.14 N 70 29 44.252 W 148 43 6.635
1.49 6032540.55 656744.58 N 70 29 44.248 W 148 43
2.25 6032540.76 656775.41 N 70 29 44.244 W 148 43
3.06 6032540.47 656811.32 N 70 29 44.234 W 148 43
0.64 6032539.96 656839.66 N 70 29 44.223 W 148 43 2.882
3.18 6032539.66 656868.59 N 70 29 44.214 W 148 43 2.031
1.70 6032539.44 656902.25 N 70 29 44.205 W 148 43 1.040
1.23 6032539.13 656934.44 N 70 29 44.195 W 148 43 0.093
0.92 6032538.83 656965.62 N 70 29 44.186 W 148 42 59.176
0.32 6032538.43 656998.16 N 70 29 44.175 W 148 42 58.219
2.28 6032538.23 657029.69 N 70 29 44.166 W 148 42 57.291
2.47 6032538.20 657058.91 N 70 29 44.160 W 148 42 56.431
0.88 6032538.22 657090.83 N 70 29 44.154 W 148 42 55.492
1.69 6032538.21 657123.93 N 70 29 44.147 W 148 42 54.518
1.03 6032538.09 657154.93 N 70 29 44.139 W 148 42 53.605
SurveyEditor Ver SP 1.0 Bld( doc40x_56) NS14\NS14\NS14A\NS14A Generated 3/16/2006 3:40 PM Page 5 of 6
Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft k ft ft k ft ft de 1100 ft ftUS ftUS
13939.17 89.74 91.65 11088.73 11145.27 -2813.24 6601.13 3081.76 1642.89 -2607.33 0.60 6032537.90 657188.82 N 70 29 44.130 W 148 42 52.608
13969.96 89.38 92.01 11088.97 11145.51 -2782.64 6631.92 3055.24 1641.90 -2576.56 1.65 6032537.58 657219.60 N 70 29 44.121 W 148 42 51.702
13998.45 90.13 92.36 11089.09 11145.63 -2754.30 6660.41 3030.68 1640.82 -2548.09 2.91 6032537.11 657248.09 N 70 29 44.110 W 148 42 50.864
14030.22 90.28 93.04 11088.98 11145.52 -2722.68 6692.18 3003.23 1639.32 -2516.35 2.19 6032536.30 657279.84 N 70 29 44.095 W 148 42 49.930
14062.16 90.33 93.73 11088.81 11145.35 -2690.84 6724.12 2975.53 1637.43 -2484.47 2.17 6032535.10 657311.76 N 70 29 44.077 W 148 42 48.992
14091.78 89.92 94.05 11088.74 11145.28 -2661.31 6753.74 2949.79 1635.43 -2454.92 1.76 6032533.72 657341.35 N 70 29 44.057 W 148 42 48.122
14124.32 89.99 94.00 11088.77 11145.31 -2628.85 6786.28 2921.55 1633.14 -2422.46 0.26 6032532.14 657373.84 N 70 29 44.035 W 148 42 47.166
14156.13 89.61 94.83 11088.88 11145.42 -2597.11 6818.09 2893.93 1630.69 -2390.74 2.87 6032530.37 657405.60 N 70 29 44.011 W 148 42 46.233
Last MWD+IFR+MS 14185.32 89.55 95.22 11089.09 11145.63 -2567.96 6847.28 2868.50 1628.14 -2361.67 1.35 6032528.44 657434.73 N 70 29 43.986 W 148 42 45.377
TD (Projected) 14230.00 89.55 95.22 11089.44 11145.98 -2523.34 6891.96 2829.65 1624.07 -2317.17 0.00 6032525.33 657479.29 N 70 29 43.946 W 148 42 44.067
Survey Type: Definitive Survey
NOTES: GYD GC SS - (Gyrodata -gyro single shots - Gyrodata gyro or~ntation surveys. Not to be run above 70 degrees inclination. )
MWD + SAG - (MWD + Sag correction -- MWD with a BHA deformation correction applied. Covers all BHAcorrections-from simple 2D to finite-element 3D models. )
INC+TREND - (Inclination only surveys in near-vertical hole-where formation dip and experience enables direction of
drift to be predicted. Replaces ex-BP "Inclinometer (aamtrth in known quadrant)" model. )
MWD+IFR-MS - (In-field referenced MWD with mult~tation analysis and correction applied in post-processing.
Assumes a BHA sag correction is applied to enhance inclination accuracy. )
Les~al Description: Northing (Y) [ftUSJ Easting (X) [ftUSJ
Surface : 1179 FSL 644 FEL S11 T13N R13E UM 6030951.56 659830.67
BHL : 2802 FSL 2960 FEL S11 T13N R13E UM 6032525.33 657479.29
•
SurveyEditor Ver SP 1.0 Bld( docstOx_56) NS14\NS14\NS14A\NS14A Generated 3/16/2006 3:40 PM Page 6 of 6
3
~ ~~C~`a
~ ~5~
~ ~3~'
Date: 07-OS-2006
Transmittal Number:92794
BPXA WELL DATA TRANSMITTAL
Enclosed are the materials listed below. If you have any questions, please contact me in the PDC
at 564-4091.
SW Name Date Contractor Lo Run To De th Bottom De th Lo T e
NS32
07-27-2004
SCH
1
3836
8051 RST WATERFLOW
PRESSURE
NS32
05-26-2005
SCH
1
3750
8040 RST WATERFLOW -FLOW
MODE
NS20 06-27-2004 SCH 1 0 18495 PDC JEWELRY LOG
NS32 05-14-2004 SCH 1 0 8131 JEWELRY LOG
,~
NS30
04-03-2006
SCH
1
50
16228 SLIM CEMENT MAPPING
OOL
._
NS14A
01-29-2006
SCH
1
10181
14230 VISION SERVICE -MEASURE
DEPTH
._.A
NS14A
01-29-2006
SCH
1
10181
14230 VISION SERVICE -TRUE
VERTICAL DEPTH
~
NS30
03-17-2006
SCH
1
200
16398 VISION SERVICE -MEASURE
DEPTH
~`
NS30
03-17-2006
SCH
1
16000
16318 VISION RESISTIVITY -
MEASURE DEPTH WASH
DOWN
~-
NS30
03-17-2006
SCH
1
200
16398 VISION SERVICE -TRUE
VERTICAL DEPTH
NS11 05-29-2006 SCH 1 0 14669 PRIMARY DEPTH CONTROL
NS14A _ 01-29-2006 SCH 1 305 1425 LDWG EDIT - CD ROM
NS30 03-17-2006 SCH 1 320 16379 LDWG EDIT - CD ROM
NS11 05-29-2006 SCH 1 7770 10470 LDWG EDIT - CD ROM
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 99519-6612
5
y~:h -'¢
¢ ~y n
Date: 07-OS-2006
Transmittal Number:92794
BPXA WELL DATA TRANSMITTAL
Please Sign and Return one copy of this transmittal.
Thank You,
Andy Farmer
Petrotechnical Data Center
Attn: Doug Chromanski MMS
Tim Ryherd DNR
Howard Okland AOGCC
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 99519-6612
;~ ~ ~ ~ s'
~ a
~LASSA OII, A1~TD Gds
Co1~sERVATIOn coz-IItIISSIO~
Pat Archey
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7"' AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907)276-7542
Re: Northstar NS 14A
BP Exploration (Alaska), Inc.
Permit No: 205-202
Surface Location: 1179' FSL, 644' FEL, SEC. 11, T13N, R13E, UM
Bottomhole Location: 2753' FSL, 2423' FEL, SEC. 11, T13N, R13E, UM
Dear Mr. Archey:
Enclosed is the approved application for permit to drill the above referenced
development well.
This permit to drill does not exempt you from obtaining additional permits or
an approval required by law from other governmental agencies and does not
authorize conducting drilling operations until all other required permits and
approvals have been issued. In addition, the Commission reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20,
Chapter 25 of the Alaska Administrative Code unless the Commission
specifically authorizes a variance. Failure to comply with an applicable
provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or a Commission order, or the terms and conditions of this permit may result
in the revocation or suspension of the permit. Please provide at least twenty-
four (24) hours notice for a representative of the Commission to witness any
required test. Contact the Commission's petroleum field inspector at (907) 659-
3607 (pager) .
DATED this day of December, 2005
cc: Department of Fish 8v Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
t;nairman
b ~
p
~~,,C,~r
c~~c o z~o~
Alaska Oil &pp(~a~ Cons. ~®mmi~siu
BP Exploration R~as~a~nc.
To: Winton Hubert - AOGCC Date: December 1, 2005
From: David Johnson
Northstar ODE
Subject: NS14 Permit Application for Sidetracking NS14
Dear Mr. Hubert,
NS14 experienced high GOR in the Ivishak production from either gas coning or
communication with nearby gas injectors. As a result, NS14 has been shut-in. It is
planned to abandon the current wellbore in the Ivishak and sidetrack NS14 with a
horizontal lateral at a new location. A Sundry Notice has also been submitted for
abandoning the current wellbore.
Maximum anticipated surface pressure (full column of gas from TD to surface) is 4619
psi. We will be utilizing Nabor's 33e 5000 psi four preventer stack (3 rams and an
annular). The drilling operation will require running 2381' feet of 7° intermediate liner. We
are requesting a variance to the requirement to have two ram preventers to cover the 7"
liner and 2 ram preventers for the 5" DP. We would like to use a variable bore ram on top
that can cover both DP and casing. This would provide one ram and the annular for the 7"
liner and two rams for the DP and does not necessitate changing rams after picking up
the 7" liner. In the event of a well control incident, our standard practice is to immediately
cross-over to DP to allow ram to ram stripping (if required) and we would prefer not to
have to change out rams during ashut-in.
The only close approach for the sidetrack is with the original NS 14 wellbore which will be
abandoned.
NS14 sidetrack will utilize gas detection equipment but is not planned for mudloggers.
Please find attached the NS14 sidetrack Well Plan Summary, directional plan and
proposed completion diagram. If you should have any questions or concerns, please
contact me @ 564-4171.
S~ Y,
David A Johnson
BP Northstar ODE
564-4171 work
632-5806 cell
.. ~ I= -~
STATE OF ALASKA
ALASKA v~L AND GAS CONSERVATION CO~ISSION
PERMIT TO DRILL ~I~~~ 0~1 ~. Gas c®ns. cor»Iru~~~of'~
20 AAC 25.005 Anchtara~e
ia. Type of work ^ Drill ®Redrill
^ Re-Entry 1b. Current Well Class ^ Exploratory ®Development Oil ^ Multiple Zone
^ Stratigraphic Test ^ Service ^Development Gas ^ Single Zone
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well
Bond No. 6194193 11. Well Name and Number:
NS74A ~
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth:
MD 14657 TVD 11156 12. Field /Pool(s):
Northstar Unit
4a. Location of Well (Governmental Section):
Surface:
1179' FSL
644' FEL
SEC
11
T13N
R13E
UM 7. Property Designation:
ADL 312799
,
,
.
,
,
,
Top of Productive Horizon:
2846' FSL, 3920' FEL, SEC. 11, T13N, R13E, UM 8. Land Use Permit: 13. Approximate Spud Date:
December 21, 2005
Total Depth:
2753 FSL, 2423 FEL, SEC. 11, T13N, R13E, UM 9. Acres in Property:
4472 14. Distance to Nearest Property:
6500'
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 659831 y- 6030952 Zone- ASP4 10. KB Elevation
(Height above GL): 55.51' feet 15. Distance to Nearest Well Within Pool
2150' away from NS28
16. Deviated Wells: Kickoff Depth: 10243 feet
Maximum Hole Angle: 90 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 5188 Surface: 3849 ~
ia. Casing Program:
Size
Specifications Setting Depth
To Bottom uantlty o merit
c.f. or sacks
Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data
B-vr X s-+rz° 7" 26# L-80 -iydri~ ez+ 2361' 10065' 8582' 12426' 10760' 44 sx Class 'G'
6-1/8" 4-1/2" 12.6# 13Cr Vam To 2381' 12276' 10631' 14657' 11156' 37 sx Class 'G'
19. PRESENT WELL CONDITION`SUMMARY (To be completed for Redrill AND Re-entry Operations)
Total Depth MD (ft):
13020 Total Depth TVD (ft):
11244 Plugs (measured):
None Effective Depth MD (ft):
12931 Effective Depth TVD (ft):
11159 Junk (measured):
None
Casin Len h Size Cement Volume MD TVD
r
n uctor 202' 20" Driven 202' 202'
3252' 13-3/8" 33 sx PF 'L', 466 sx Class 'G' 3296' 3208'
r 10865' 9-5/8" 65 sx Econolite, 487 sx Class 'G' 10908 9292'
Pro ion 1730' 7" 81 sx Class 'G' 10741' - 12471' 9148' - 10715'
699' 4-1/2" 106 sx Class 'G' 12319' - 13018' 10569' - 11236'
Perforation Depth MD (ft): 12860' - 12910' Perforation Depth TVD (ft): 11085' - 11133'
20. Attachments ®Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis
^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Dave Johnson, 564-4171
Printed Name Pat Archey Title Senior Driiiing Engineer
q Prepared By Name/Number:
Si nature P~ QZ.. Phone 564-5803 Date , z / "'ds Sondra Stewman, 564-4750
Commission Use Only
Permit To Drill
Number: ZQS- -2CJ2 API Number:
50- 029-23026-01-00 Permit Approval
Date: See cover letter for
other requirements
Conditions of Approval: Samples Required ~_; Yes ~No Mud Log Required ^ Yes ~ No
Hydrogen Sulfide Measures Yes ^; No Directional Survey Required Yes ^ No
Other: T~Qf-~~--" ~O ~ f ~DOO ~D u'
P~ 20 ~. . 5 (l~)L~), ~l f ~[~,a,~`e 13nY~t= ;s ~(~~~~
PPROVED BY fir-/ /~1
A roved ~HE COMMISSION Date !i l ~-V
Form 10-401 ev' d o04 ~_ ~ -~ ~ Submit In Duplicate
BP Northstar
NS 14 Permit Data
NS 14 Sidetrack Scope
The original NS 14 completion will be plugged and abandoned due to high GOR possibly from
coning and/or communication with a nearby gas injector. This will be achieved using a full bor~:
squeeze of 9 to10 bbl of Class G, 1s.8 ppg cement while displacing the tubing volume.
The existing s-1/2" X 4-1/2" tubing will be chemically cut at approximately 12,266' MD and pulled.
A bridge plug will be set at approximately 10,234' TMD and a whipstock and milling assembly run
to cut a window from 10,214' to 10231' MD (8,70s' to 8,718' TVD). The original wellbore will be
sidetracked in 8-1/2" hole (opened to 9-1/2") to 12426' MD (Sag Target) and a 7" drilling liner will
be set and cemented. After cementing the 7" liner, 6-1/8" hole will be landed at 90° and continue for
approximately 1,500' in the Ivishak. A 4-1/2" 13 Cr liner will be run and cemented and the liner will
be perforated with tubing conveyed guns. The well will be completed with 4-1/2", 13 Cr Vam Top /
tubing. The new horizontal section will minimize gas coning effects and minimize communication
with the injector -reducing GOR.
Pre-Riq Operations
1. Test 9-5/8" pack-off to 5000 psi.
2. MIT inner annulus to 4200 psi.
3. Through tubing cement squeeze perforations with 15.8 ppg cement slurry. Final
cement volume should be determined by infectivity test. Minimum cement volume
should be sufficient to cover perforations and leave TOC at +/- 12426' TMD. This
is 505' of cement above the PBTD of 12931' and requires a minimum volume of
7.7 BBLS to fill the liner. Desired minimum volume is 9.7 BBLS of cement slurry.
(7.7 BBLS to fill pipe and 2 BBLS into perfs. WOC
4. Run wireline drift tubing and tag TOC. Pressure test tubing to 2000 psi.
5. Run and set plug in XN nipple at 12318'.
6. Chemically cut tubing at 12266' TMD above packer.
7. Install BPV.
Drilling Riq Operation:
1. MIRU.
2. Circulate well clean with sea water.
3. NU BOPE and test to 5000 psi (3500 psi annular).
4. Pull 5-1/2" X 4-1/2" tubing string
5. PU DP. RIH w/ casing scraper to +/-10400'. Test casing to 3500 psi.
6. RIH and set 9-5/8" bridge plug at ~ 10234' TMD. Final setting depth will be
determined by CCL to space out bridge plug for whipstock. The desired top of
window is 10214'. Pressure test bridge plug.
7. Run and set whipstock on top of BP. Mill a window in 9-5/8" casing from +/- 10214
to 10230'.
12iv2oos
Page 1 of 10
BP Northstar
NS 14 Permit Data
8. Perform a FIT to a minimum of 14.0 ppg EMW, (FIT/LOT procedure on file with ~
AOGCC).
9. Pick up 8-1/2" directional assembly. Ensure the mud is in good condition prior to
drilling ahead. Drill the drilling liner hole section to the top of the Sag at
approximately 12368' MD (10709' TVD RKB). The Intermediate casing point has
been picked at 12426' MD. POOH.
10. Run and cement a 7" 26# Hydril 521 drilling liner. Displace cement with mud. Set
the liner hanger and liner top packer. Circulate excess cement from well bore.
11. POOH and lay down liner running tools. Test 9 5/8" x 7" casing to 2900 with 12.5
ppg fluid. This test pressure may change based on the actual mud weight in the
hole.
12. RIH w/ 6" directional assembly. Clean out the 7" 26# liner to the landing collar.
Displace the wellbore to 9.1 ppg mud.
13. Drill out remaining cement. Drill 20' of new formation below 7" shoe with 9.1 ppg ~.
MW. Perform a FIT to 11.5 ppg. EMW (FIT/LOT procedure on file with AOGCC).
14. Drill 6-1/8" horizontal production interval to the proposed TD of 14656' MD.
Condition mud weight to 9.3 ppg prior to POOH.
15. Run and cement the 4-1/2" 12.6# 13 CR-80 liner with 1 to 3 ECPs. Set the liner
hanger and liner top packer. Circulate a minimum of one bottoms-up to remove ~
excess cement with a 9.3 ppg mud.
16. Once a successful cement job is obtained, pressure test liner lap to 1500 psi with
9.3 ppg mud to confirm pressure integrity.
17. Change well over to 9.3 ppg completion fluid (less than 80 NTU's) and by using
spacers as per MI recommendation.
18. Shut down and monitor the well for a minimum of 30 minutes (negative test on
liner top).
19. POOH and lay down liner running tool.
20. Close blind rams and test 9 5/8" casing x 7" drilling liner x 4'/z" liner to 3700 psi
for 30 minutes. This liner lap test assumes a 15.5 ppg LOT at 7" shoe (10704' r"
TVDrkb) + 500 psi.
21. Run tubing conveyed perforating guns and perforate as determined from logs.
22. Run and land the 4-1/2" 12.6# 13-CR80 Vam Top tubing string with fiber optics' j
as per completion diagram. Pressure test the control lines and tubing hanger
seals to 5000 psi.
23. Set 7" X 4'/2" packer. Test tubing and annulus to 4200 psi. Open shear valve in
gas lift mandrel.
24. Freeze protect the tubing and annulus to 3000' TMD/TVD
25. Set the TWC valve in tubing hanger. Nipple down BOPs. Nipple up the 13-5/8"
5000 psi x 7-1/16" 5000 psi tubing head adapter and 7-1/16", 5000 psi tree. Install j
all flanges and needle valves.
26. Test the tubing head adapter and tree to 5000 psi. Pull TWC valve and install
BPV.
27. Ensure all tree and annulus valves are secured. RD and move off well.
12/1/2005 Page 2 of 10
BP Northstar
NS 14 Permit Data
General Information
•
Type of Well (producer or injector): Producer
Northstar Slot: NS 14
Surface Location•
• 1179' FSL, 644' FEL, Sec. 11, T13N, R13E, UM ~
X = 659,831 Y = 6,030,952
Target (Ivishak): 2846 FSL, 3920 FEL, Sec. 11, T13N, R13E, UM
Start of Horizontal X= 656,518.86 Y = 6,032,548.65 11,100 TVDss
300' Radius 11,155.21 TVDrkb
Bottom Hole Location: 2753 FSL, 2423 FEL, Sec. 11, T13N, R13E, UM ~
End of Horizontal X = 658,017.47 Y = 6,032,486.67 11,100 TVDss
300' Radius 11,155.21 TVDrkb
AFE Number: Ri Nabors 33E ~'
Estimated Start Date: 1 2 2005 O eratin da s to com fete: 24
MD: 14657' TVDrkb: 11156' RKB/Surface Elevation: a.m.s.l. 55.50'/ 15.67'
Well Desi n conventional, slimhole, etc.: Modified Bi Bore
Ob'ective: Ivishak Producer
Well Name: NS 14
API Number
BHP: 5188 si 11,100' TVDss
EMW: 8.95
BHT: 254 °F 11,100' TVDss
Land Use Permit: LO-N96-006
Distance to Nearest Pro er 6500 ft
Distance to Nearest Well within Pool: 2150' to NS 28.
Cellar box: Elevation above MSL = 15.67'
RKB to Cellar box: 39.83' Estimated
Ri Elevation: RKB +MSL = 55.50'
Conductor: 201' MDrkb of 20", 169#, X-56 re-driven
12/6/2005 Page 3 of 10
BP Northstar
NS 14 Permit Data
Formation Tops(TVDss) and Estimated Pore Pressures
Estimated De t he Estimated
Formation Pore Press.
TVDss TVDrkb MDrkb Psi
To Ku aruk 8675 8730 10245 4265 9.45
Kick off Point 8728 8677 10243
Ku aruk C 8870 8925 10462 4428 9.60
To Miluveach 9165 9220 10766 4585 9.62
Intermediate to in oint 9230 9285 10831
To Kin ak 9700 9755 11303 4690 9.30
Fault 18 throw < 20' 10012 10067 11629
To Sa River 10654 10709 12367 4984 8.95
Geol tar et #1 10700 10755 12421
Intermediate casin oint 10704 10759 12426 5015 9.01
To Shublik - 90 10870 10925 12622 5084 8.95
To Ivishak 10960 11015 12745 5126 8.95
Fault 157 throw < 20' 11000 10995 12715
Landin oint 11100 11155 13133
Oil -Water contact 11100 11156 13156 5192 8.95
Total De th 11100 11156 14656 5188 8.94
Notes:
ll,~
1. Anomalous high gas readings reported in Seal A-O1 mud log at the following interval: 3690-3775; j
3925 - 4050;
4140 - 4425, 4510 - 4700 MD - No significant Gas shows in NS10 through NS17 through this
interval -max gas = 70 units
2. Depth predictions based on NS14 wellbore results.
3. Pore pressures estimated using RFT /DST data in offset Seal Wells, NS29, NS27, N531, NS13,
NS08 wells and pressure data from NS14, NS08, etc.
4. OWC expected at -11,100' TVDss -13,157' TMD.
12/1/2005 Page 4 of 10
BP Northstar
NS 14 Permit Data
General Information
PRESENT STATUS'
Present Casing/Tubing
Hole
Size Casing
Size Wt/Ft Grade Conn Burst Collapse Top
TMD Top
TVD Btm
TMD BTM
TVD Length
42 20 169 X-56 Weld 0 0 200 200 200
16 13-3/8 68 L-80 BTC 5020 2260 0 0 3296 3216 3296
12.25 9-5/8 47 L-80 BTC 6870 4750 0 0 10908 9296 10908
8.5 7 26 L-80 BTC-M 7240 5410 10741 9156 12471 10721 1730
6.125 4-1/2 12.6 13CR Vam Ace 8430 7500 12319 10575 13018 11244 699
TBG 5-1/2 4.6 13CR Vam Ace 7740 6290 0 0 10147 8653 10147
TBG 4-1/2 12.6 13CR Vam Ace 8430 7500 10147 8653 12331 10586 2184
Present Perforations
Formation TVD TVD Sqz/Open BHP Gradient EMW
Pressure Psi/ft lb/ al
Ivishak 12766 - 12916 11001 -11145 S ueezed S z S z S z
Ivishak 12860 -12910 11090 -11139 O en 5126 0.462 8.9
Bottom Hole Temp estimated at 254 degrees.
Proposed CasinE/Tubing
Hole
Size Casing
Size Wt/Ft Grade Conn Burst Collapse Top
TMD Top
TVD Btm
TMD BTM
TVD Length
42 20 169 X-56 Weld 0 0 200 200 200
16 13-3/8 68 L-80 BTC 5020 2260 0 0 3296 3216 3296
12.25 9-5/8 47 L-80 BTC 6870 4750 0 0 10215 8705 10215
Window to be Milled at 10,215" MD, 8705' TVD
.5 X 9.5 7 26 L-80 Hydril
521 7240 5410 10065 8582 12426 10760 2361
6.125 4-1/2 12.6 13CR Vam To 8430 7500 12276 10631 14657 11156 2381
TBG 4-1/2 12.6 13CR Vam To 8430 7500 0 0 12270 10626 12270
D
i
ti Coupling ID Drift Tensile Stren th Make U Tor ue
escr
p
on OD Inches Inches Bod Thread Minimum O timum Maximum
7" 26# L-80 H dril 521 7.300 6.276 6.151 604,000 510,000 7200 8600 N/A
4-1/2" 12.6# 13Cr80 Vam To 4.937 3.913 3.833 288,000 288 000 4000 4440 4880
12/1/2005 Page 5 of 10
BP Northstar
NS 14 Permit Data
MUD PROGRAM SUMMARY:
Drilling Liner Interval Mud Properties: Inhibited KCL Mud
•
S-1/2" opened to 9-/12" Hole Section
From KOP at 10243'MD to 12491' MD Sa tar et
Depth
TMD Interval Density PV YP APU
HTHP pH
10215 -10243 indow 11.5 15 - 25 30 - 32 <6 9 - 9.5
10243 -10466 uparuk D to 300' above Miluveach 11.5 15 - 25 30 - 32 <6 9 - 9.5
10466 -1 1003 iluveach to 300 above Kingak 11.5 -12.5 20 - 30 26 - 30 <5 / <12 9 - 9.5
11003 - 12426 ingak to Sag & Casing Point 12.5 25 - 35 26 - 30 <4 / <10 9 - 9.5
It will be critical to keep fluid loss very tight during this interval to combat differential sticking on the liner
run. Keeping mud density as low as possible through the upper hole sections and weighting up
concurrently with tightening fluid loss will be critical for drilling through the Kingak and landing in top-of-
Sag.
Production Hole Mud Properties: Seawater/CaC03 Drill-In Fluid 6.125" Hole Section
rom Intermediate Casin Shoe to 14656' MD / 11,176' TVD
Depth
TMD Interval Density
) PV YP APU
HTHP pH
10215 -14657 Sag - Shublik - Ivishak - TD 9.1 - 9.3 10-18 22-28 4-6 / <12 9 - 9.5
DIRECTIONAL'
OP: 10243' MD, 8728' TVD Build Rates 10°/100' whi stock, 3.5°/100' initial build.
aximum Hole An le: t90°
lose Approach Wells: With the kickoff point at 10243', the only close approach potential is with the existing
NS 14 wellbore. There are no ma'or risk areas in the current well lap. ~~
S10 Area of Review NS 14 does not enter the Area of Review for NS 10 dis osal well.
urve Pro ram: IFR+MS corrected MWD surveys to TD.
ANTI-COLLISION ISSUES:
There are no known anti-collision issues with the current well plan. The only close approach potential is with the
existing NS 141ower wellbore that will be abandoned.
WELL CONTROL'
Equipment will be installed that is capable of handling maximum potential surface pressures. (Schematics are on
.file with the AOGCC and MMS.)
/ 5000 psi working pressure pipe rams (2) /
/ Blind/shear rams (VBRs will be available for cut-and-pull decompletion of 4-1/2"x 5-1/2" tubing string).
/ Annular preventer
Based upon the calculations below, BOP equipment will be tested to 5000 psi.
12/5/2005 Page 6 of 10
BP Northstar
NS 14 Permit Data
•
Maximum Surface Pressure -Full Column of Gas from TD - 0.12 psi/ft gradient
Gradients - si/ft Pressures
Hole Section TVD Formation Gas BHP Surface 1.2 * Surface
8 '/" Sidetrack Hole Section:
Kuparuk C 8925 0.496 0.12 4428 3383 4060
Miluveach 9220 0.497 0.12 4585 3476 4171
Kin ak 9755 0.481 0.12 4690 3522 4226
To of Sa 10709 0.465 0.12 4980 3695 4434
6" Production Hole Section:
Total Depth 11156 0.465 0.12 5188 3849 4619
Planned BOP test ressure:5000 si annular to 3500 s i ~
Planned com letion fluid: 8.5 Seawater / 6.8 Diesel
Formation Integrity/Casing Testing:
Test Point Depth Shoe Test
T e EMW Estimated
Casin finer Test
5/8" Window 20' min of new hole FIT 14.0 EMW 3500 si w/ 11.5
" Intermediate Liner 20' min from 7" shoe FIT 11.5 EMW 2900 si w/ 9.1
''/Z" Production Liner n/a n/a n/a 4100 si w
Northstar Nabors Rig 33E i
Rig Floor
Hydril Type `GK'
28.97'
°°"°"°"` Pi Ram 32.40' ti
Dou6b Studded pei
Blind Ram 34.27' ~
Mud Cross
~.D~.
Pipe Ram 38.03'
Double Swdded
9. 3' `~
sp>r«
~ol~ar.~~l spool 40.30'
MAN MAN Tobmg MAN MAN
Spool
cer;og MAN MAN 41.20'
spoa
41.26'
12/5/2005 Page 7 of 10
BP Northstar
NS 14 Permit Data
Lolisinlr Program
Well Evaluation ntermediate Hole 8-I/2" roduction Hole 6-1/8" Purpose /comments
Interval - MDrkb de the From TO hn From TO Im
MWD/LWD
Directional 0,281 2,621 i h 12,426 4656 Hip=h Correlation, hazard eval., directional into
Gamma Ra 0,281 2,621 Low 12,426 4656 Hi h Correlation
G ro None None Close a roach. Directional certain
PWD 0,281 2,621 Low 12,426 4656 Low Correlation, hazard eval.
Resistivit -recorded mode None None Correlation, rock ro
Resistivit -real time mode 0,281 0,831 12,426 4656 Low Correlation, rock ro
Densit None 12,426 4656 Low Formation evaluation
Neutron None 12,426 4656 Low Formation evaluation
Formation pressure -drilling None None Used to determine microporous chert
contribution
Sonic ISONIC None None Formation eval. /Seismic eval
GR None Contin ent V. Hi h Correlation, rock ro
Resistivit HALS None Contin ent V. Hi h Correlation, rock ro
Neutron HGNS) None Contin ent V. Hi h Porosit evaluation, HC e
Densi HRMS ** None Contin ent V. Hi h Por. Eval, Seismic anal.
Sonic DIPOLE) None None Por Eval, Seismic anal-Lower Di ole mode
FM[ 4 arm cali er ** None None Kin ak Stud ;Stress anal sis
CMR None None Permeabili ,fluid, & orosit
RFT None Pressure, fluid anal sis - 30 ressures
MDT None Pressure, fluid anal sis
SCMT / CBL / USIT None None Low Gas/Oil contact to be isolated with ECP
SONIC-DSI P wave onl None None
PDC - GR to needed ,281 2,621 i h None
Mudlo in Gas Detection None None Correl, Lith eval, HC eval, Pressure
MAD PASS
00' TVD 0500'
VD
Low
12,426
4,656
4 wet and 4 d sets
None None Lith eval, rock ro
None None 3 sets
None None Geochem anal sis
Comments Importance
definitions Wireline logs MWD /LWD logs
Intermediate Hole: PWD Resistivity and LWD in
real time mode in the Kuparuk interval. Low Do not re-run if
unsuccessful If tool fails -drill ahead
Intermediate Hole: Cased hole gamma ray to be run
for primary depth control purposes prior to drilling
production hole
Med Re-run if unsuccessful
except if conditioning trip
reyuired to run casing
Intermediate Hole :PDC - GR log needed to adjust
depths for final estimate of TD. MAD PASS needed
after drilling out Intermediate shoe for depth
correlation
High Re-run if unsuccessful,
even if conditioning trip
reyuired. Drillpipe
conveyed logging not
re uired
If unsuccessful, POOH and repair if
possible. Willing to run back in
hole w/o tool repaired
Production Hole: LWD Density and Neutron logs to
V. High Re-run if unsuccessful,
even if drill pipe conveyed
to in needed
be placed on last bit trip in production hole interval.
Open hole wireline logs run if MWD logs fail.
Critical (Cr)
Re-run if unsuccessful
even if sidetrack hole or
DPC logging needed
If unsuccessful -POOH and wait to
tix before proceeding even if the rig
remains idle
12/1/2005 Page 8 of 10
BP Northstar
NS 14 Permit Data
MATERIALS'
L-80 Drlg Liner: 2361' 7", 26# L-80 Hydri1521
1 - 8 '/z" BBL reamer shoe
1- 7" HES Super Seal II Float Collar
7 - 7" x 8 1/4" SV Rigid Centralizers
7 - 7" x 8 1/4" Stop Bands
1 - 7" x 9 5/8" Baker Double-Grip Flex Lock Hydraulic Set Liner
Hanger -Rotating hanger.
1 - 7" x 9 5/8" Baker ZXP Liner Top Packer
1 - 7" Baker HRD running tool
1 - 7" Baker Landing Collar and plug set
13CR-80 Liner: 2381' 4-1/2", 12.6# 13Cr-80 Vam Top
2 - 4-1/2" 12.6# 13Cr-80 Vam Top pup joints
1- 4-1/2" HES Super Seal II Float Shoe
1- 4-1/2" HES Super Seal II Float Collar
120 - 4-1/2" x 5-3/4" Straight Bladed centralizers
60 - 4-1/2" x 5-3/4" Stop Bands
1 to 3 - 4/12" TAM ZTRACAP ECP
1 - 4-1/2" x 7" Baker Flex Lock Hydraulic Set Liner Hanger
1- 4-1/2" x 7" Baker ZXP Liner Top Packer
1 - 4-1/2" Baker Landing Collar and plug set
13Cr Completion: 12270' 4-1/2", 12.6# 13Cr-80 Vam Top
1 4 ''h" ABB-VGI tubing hanger
1 4 '/z" ABB-VGI adapter flange
1 4'/z" ABB-VGI 5-1/8" SK Swab Valve w/ tree cap
1 CIDRA mandrel and 0.25" fiber optic cable (w/ 4
'h" cable clamps).
1 4'/z" SVLN and 1- 0.25" control lines
1 4 'h" x 1" GLM with RP Shear valve installed
1 7" x 4'h" Baker 13 Cr packer S-3.
1 4 '/z" WLEG (Self-Aligning Mule Shoe)
2 4 'h" 13 Cr X nipples
1 4 'h" 13 Cr XN nipple
12/1/2005 Page 9 of 10
BP Northstar
NS 14 Permit Data
CEMENT PROGRAM'
asin 7" 26# 521 H dril Drl Liner
asis: Stage 1:
Slurry: Based on 2171' of 9 1/2" open hole x 7" csg + 50% excess + 150' 9 5/8" csg x 7" csg liner
lap + 200' 9-5/8" c " drillpipe above TOL + 80' shoe joint.
Sl TOC: At 985 MD
to a 1: Total Cement / cer S acer 0 bbl Mud II S acer -12.0
Slurry 14 .S bbl / 4 sk of 15.8 ppg Premium `G'.
.5 cf/sk,
asin -1/2" 12.6# 13Cr-80 Vam-To Prod Liner
asis: tage 1:
Slurry: Based on 2230' of 6.125" open hole x 4 % liner + 50% excess + 150' of 7" csg x 4 1/2" csg
finer lap + 200' of 7" sg 4" drillpipe above TOL + 80' shoe joint.
Slu TOC: At 207 ' MD
tage 1: Total Cement / er Spacer 15 bbl CW 100 Flush
30 bbl MudP h II S acer -12.0
Slurry 64.7 bbl / sk of 15.8 ppg Premium `G'.
.53~f/sk,
12/1/2005 Page l0 of 10
by
NS14A (P4) Proposal Schlumberger
Cheat: BP Exploration Alaska
t NorBrstar
Wueturel8bl: NaritstarPF/NS14 ~~~~~I~~
Wtll: NS14
BaehaM: Plan NS14A
tMNAPIr: 500292302601
Swwy Nrae I Oate: NS14A (P4) I October 4, 2005
Tat I AFbI DOI I ~ ratio: 223.176° 17444.34 ft I6.339I0.667
Crdd CexMaM IiyeteM: NAD27 Alaska Staff Planes, Zone 04, US Feel
Lseatisn La1pa~ N 70.49110483, W 148.69329586
Lasatieu livid fYE yAL• N 6030951.560 ftUS, E 659830.670 ftUS
field Cewerpace Ae41e: +1.23170967°
Survey 1 DLS CorapWation Method: Minimum Curvature I Li
Vertical Section Azimuth: 98.120°
Veetieel Sactiar Origin: N 0.000 ft, E 0.000 ft
TVD Refererce Dacha: Rotary Table
Tw Retaence Elevation: 55.51 ft relative to MSL
Sea Bed I Greund Level Ekv~ion: 15.67 ft relative to MSL
Mapufk DeeYnafton: 24.765°
Total Field Strenplh: 57615.818 nT
Wpnetic Dip: 81.018°
DaetinkW Date: December 25, 2005
Yapuetie Deetinatiai Model: BGGM 2005
North Reference: True NaAh
Total Con' Map NorW ~ Trw North: +24,765°
Ceammrte M
eceu
red IaNiaatiaa Aai~WM Sub8ea TVD TVD V
O ~ !~ EW Tool Face Lk.S BuYd Rafe WaMc Rab Ike Easfhp LatiMrde LongituM
D
~ S
k k k k k k t~k Mk 01k k0s
rue-pt~uvey iv~oo.or s~.wa ~a-.~y aou~.v~r aox.aa -4JL6.W ~aus.a~ -~r~~-.ro -~ro.~ru c.oo -v.vr w.oo ouocroo.oa wooao.ai rvr~.q,rosvcmr yr ina.rcoiru~c
Top NM~todc 10214.54 33.92 262.19 8649.49 8705.00 -4352.52 1900.19 -4125.48 60.OOG 2.33 -0.99 -3.78 6032762.50 655665.60 N 70.49629278 W 148.72702686
Base VYhipabdc 10230.54 34.92 265.10 8662.69 8718.20 -4361.27 1899.20 -4134.47 0.000 12.00 6.22 18.16 6032761.31 655656.64 N 70.49629004 W 148.72710033
KOP Crv 10J100 10242.54 34.92 265.10 8672.53 8728.04 -4367.96 1898.61 -4141.31 160.OOG 0.00 0.00 0.00 6032760.58 655649.81 N 70.49628843 W 148.72715628
10300.00 29.57 269.08 8721.12 8776.63 -4398.01 1896.97 -4171.90 156.63G 10.00 -9.30 6.92 6032758.29 655619.27 N 70.49628391 W 148.72740637
Crv 3.5/100 10392.54 21.37 279.16 8804.63 8860.14 4437.51 1899.29 X211.46 -175.49G 10.00 -8.87 10.89 6032759.75 655579.66 N 70.49629019 W 148.72772987
10400.00 21.91 279.10 8811.58 8867.09 -4440.21 1899.72 -4214.13 -175.44G 3.50 -3.49 -0.76 6032760.12 655576.99 N 70.49629135 W 148.72775169
KUPC 10462. f 8 18.94 278.57 8870.00 8925.51 -4461.50 1903.00 -4235.16 -174.94G 3.51 -3.49 -0.86 6032762.95 65b555.89 N 70.49830026 W 148.72792369
10500.00 17.62 278.18 8905.91 8961.42 -4473.36 1904.72 -4246.90 -174.57G 3.51 -3.49 -1.02 6032764.42 655544.12 N 70.49630497 W 148.72801964
10600.00 14.13 276.82 9002.08 9057.59 -4500.70 18.33 -4274.01 -173.26G 3.51 -3.49 -1.36 6032767.44 655516.95 N 70.49631477 W 148.72824129
10700.00 10.66 274.60 9099.74 9155.25 -4522.14 1910.52 -4295.35 -171.09G 3.51 -3.47 -2.22 6032769.17 655495.56 N 70.49632073 W 148.728
TMLV
10766.18
8.37
272.13
9165.00
9220.51
-4533.04
1911.19
-4306.27
-168.66G
3.51
-3.45
-3.73
6032769.61
655484.63 4
N 70.432254 W 148.72
10800.00 7.22 270.28 9198.51 9254.02 -4537.60 1911.29 -4310.85 -166.82G 3.50 -3.43 -5.49 6032769.61 655480.05 N 70.49632281 W 148.728
10900.00 3.89 258.41 9298.03 9353.54 -4547.01 1910.64 -4320.45 -166.04M 3.51 -3.33 -11.87 6032768.76 655470.46 N 70.49632102 W 148.72862108
11000.00 1.64 193.96 9397.93 9453.44 -4550.35 1908.57 -4324.12 128.52M 3.51 -2.24 -64.45 6032766.61 655466.84 N 70.49631536 W 148.72865104
11100.00 3.85 128.52 9497.83 9553.34 -4547.59 1905.09 -4321.83 116.50M 3.51 2.21 -65.44 6032763.17 655469.20 N 70.49630584 W 148.72863234
11200.00 7.18 116.50 9597.35 9652.86 -4538.76 1900.20 -4313.61 -13.24G 3.51 3.33 -12.02 6032758.47 655477.53 N 70.49629252 W 148.72856506
11300.00 10.62 112.14 9696.13 9751.64 -4523.88 1893.94 -4299.47 -8.94G 3.51 3.44 -4.36 6032752.51 655491.80 N 70.49627542 W 148.72844944
TKNG i 1303.94 10.78 112.03 9700.00 9755.51 -4523.17 1893.66 -4298.79 -8.82G 3.51 3.46 -2.92 6032752.25 655492.48 N 70.49627468 W 148.72844391
11400.00 14.10 109.91 9793.80 9849.31 -4503.01 1886.32 -4279.48 -6.75G 3.50 3.47 -2.21 6032745.32 655511.95 N 70.49625463 W 148.72828592
11500.00 17.58 108.54 9889.99 9945.50 -4476.22 1877.36 -4253.70 -5.44G 3.50 3.49 -1.36 6032736.92 655537.91 N 70.49623022 W 148.72807511
11600.00 21.07 107.62 9984.34 10039.85 -4443.63 1867.12 -4222.23 -4.57G 3.51 3.49 -0.92 6032727.36 655569.59 N 70.49620227 W 148.72781780
11700.00 24.57 106.95 10076.50 10132.01 -4405.34 1855.61 -4185.20 -3.95G 3.51 3.50 -0.67 6032716.65 655606.86 N 70.49617089 W 148.72751496
We(~esgn Ver SP 1.0 Bb( doc40x`56) NS14WS14\Plan NS74AWS14A (P4) Generated 10/4/2005 8:25 AM Page 1 of 2
Comments Measured inclination Azimuth Sub•Sea TVD TVD Vertical NS EW Tool Face DLS Build Rate Walk Rate Northing Easting Latitude Longitude
Depth Section
ft de de k ft ft ft ft d de 1100 ft de 100 ft de 100 k ftUS ftUS
I IODU.VU LO.U/ IV0.44 -IU 100. IL IULL I.OJ -4J01.71 104L.Oy -414L./4 -J.4.YV J.VI J.JV -V.:JI UvaLi VY.oV vJJVY~.JV IY IV.YaV IJVGI VV IYV.i Gl IViII
End Crv 11885.34 31.05 106.08 10240.34 10295.85 -4319.83 1831.11 -4102.32 O.OOG 3.51 3.50 -0.41 6032693.94 655690.24 N 70.49610409 W 148.72683721
Crv 3.5/100 11898.17 31.05 106.08 10251.34 10306.85 -4313.28 1829.28 -4095.96 -141.34G 0.00 0.00 0.00 6032692.24 655696.63 N 70.49609909 W 148.72678520
11900.00 31.00 106.00 10252.90 10308.41 -4312.34 1829.02 -4095.06 -141.27G 3.50 -2.73 -4.24 6032692.00 655697.54 N 70.49609838 W 148.72677780
End Crv 11900.12 31.00 106.00 10253.00 10308.51 -4312.29 1829.00 -4095.00 O.OOG 3.50 -2.73 -4.25 6032691.99 655697.60 N 70.49609833 W 148.72677733
TSAG 12367.94 31.00 106.00 10654.00 10709.51 -4073.62 1762.59 -3863.39 O.OOG 0.00 0.00 0.00 6032630.57 655930.57 N 70.49591724 W 148.72488335
12426.27 31.00 106.00 10704.00 10759.51 -4043.86 1754.31 -3834.51 O.OOG 0.00 0.00 0.00 6032622.91 655959.62 N 70.49589466 W 148.72464720
7" Csg Pt 12426.28 31.00 106.00 10704.01 10759.52 -4043.85 1754.30 -3834.50 O.OOG 0.00 0.00 0.00 6032622.91 655959.63 N 70.49589465 W 148.72464715
Crv 10/100 12558.77 31.00 106.00 10817.57 10873.08 -3976.26 1735.50 -3768.91 -14.39G 0.00 0.00 0.00 6032605.52 656025.60 N 70.49584336 W 148.72411078
12600.00 35.01 104.22 10852.15 10907.66 -3953.97 1729.66 -3747.23 -12.89G 10.00 9.72 -4.33 6032600.15 656047.40 N 70.49582746 W 148.72393349
TSHU 12622.09 37.16 103.40 10870.00 10925.51 -3941.02 1726.56 -3734.59 -12.23G 10.00 9.76 -3.69 6032597.32 656060.10 N 70.49581900 W 148.7238
12700.00 44.80 101.06 10928.77 10984.28 -3890.10 1715.82 -3684.69 -10.46G 10.00 9.81 -3.00 6032587.66 656110.22 N 70.49578973 W 148.72342 8
TSAD 12745.85 49.32 99.97 10960.00 11015.51 -3856.57 1709.71 -3651.69 -9.71G 10.00 9.85 -2.39 6032582.26 656143.34 N 70.49577307 W 148.72315229
12800.00 54.66 98.85 10993.34 11048.85 -3813.94 1702.75 -3609.62 -9.03G 10.00 9.87 -2.07 6032576.21 656185.55 N 70.49575412 W 148.72280825
12900.00 64.55 97.12 11043.87 11099.38 -3727.79 1690.85 -3524.30 -8.15G 10.00 9.89 -1.73 6032566.14 656271.10 N 70.49572172 W 148.72211065
13000.00 74.45 95.66 11078.85 11134.36 -3634.29 1680.48 -3431.33 -7.63G 10.00 9.91 -1.46 6032557.77 656364.26 N 70.49569351 W 148.72135048
13100.00 84.37 94.33 11097.21 11152.72 -3536.27 1671.95 -3333.53 -7.39G 10.00 9.91 -1.33 6032551.35 656462.22 N 70.49567034 W 148.72055083
End Crv 13156.81 90.00 93.60 11100.00 11155.51 -3479.70 1668.03 -3276.95 O.OOG 10.00 9.92 -1.28 6032548.65 656518.86 N 70.49565970 W 148.72008822
TD / 4-1/2" Lnr 14656.81 90.00 93.60 11100.00 11155.51 -1984.37 1573.85 -1779.91 O.OOG 0.00 0.00 0.00 6032486.67 658017.47 N 70.49540378 W 148.70784822
J
We1lDesign Ver SP 1.0 Bld( doc40x_56) NS14\NS14\Plan NS14A\NS14A (P4) Generated 10/4/2005 8:25 AM Page 2 of 2
by
Schlumberger
~" NS14A (P4) F,E`o Northstar S,RM~nRE Northstar PF
MepMic PMMnelele Surlau laa8on NRD2] amen. Sbla Pbnee, Zma 0a, UB Fwl MbManaou
MOON: BGGM 2005 Op: 81.818' UMe'. DeceniEal25.2W5 NI8292].911 NaoNnp: 80]0951.56 MIS GOO GOnv: .1.28110961' Sbl: NSta TVD RN: RdaryTWe(55.S11INwve MSLI
My [1ec: ~2a.)85' FS: 5)615.8 nT W1aB at 35.885 EaNing: 859880.8>XUS Scab Fad'. 0.9999190199 PMn. NS1aA IPa) Srvy Gale: Pcl°Der 0.1. 2005
-5400 -4800 -4200 3600 -3000 -2400 -1800
9000
~ 9600
g
m
c
u
_m
~ 10200
O
10800
11400
_._ _..
............... ........................................ ... rv 7.5/fal...................
nd crv
rc.on i
.._.._.._..:...._.._.._.._.._.._.._.:_.._.._.._.._.._..YSAG_.._. .. _.._.._.._..~.._.._.._.._.._.._.._.._:._.._.._.._.._.._.._.._..s.._.._.._.._.._.._.._.._.:_.._.._.._.._.._
i cry ~a~p
...............:...............................s................................:........ ....... ....... ~................................j.................................>................................ i.....................
End Crv 7p ~ a-1f1- Llv
._.._.._ _.._.._.._.._.._.._.._ _.._.._.._.._.._.._.._Y~. _.._ _.._.._.._ _ ._.._ _.._.._.._.._ _.._.._.._.._.._.._.._ _.._.._.._.._ _.._.._ _ ._.._.._.._. _
._.._.. _.._.._.._.._.._.._.._ .._.._.._.._.._.._.._. ..1.~p -.._. _ ._..- _ .-' - -.._.._.._.._.. _.._.._.._.._.._.._.._ _.._.._.._.._ _ ._.._ _ ._.._.._.._. _
span ~pa~
Sp
...............j.................................:................................j................................:................................j.................................;................................ j.....................
-5400 -4800 -4200 3600 3000 -2400 -1800
Vertical Section (ft) Azim = 98.12°, Scale = 1(in):600(ft) Origin = 0 N/-S, 0 E/-V
9000
9600
10200
10800
11400
•
8 ~ o
N N •- ~
_~
~..'~
y
Q.
a
w
N
Z
~
93
9
~~
s
~~ 8
Q
v
N
S
'
~ °
g o
a
c
n
'
~
~
#
~~
~~~
. ~
~ 9
39d
a pp
p
l+7
t
^
Z
S
afr
°y
m~
~ <~
~ o'~
~
Z g
..j ................................J................................j................................b............. .......
~ d
pj <
F N
t:
v:
F
W:
..j ................................y.......... ....... ...........,................................,.......................
g
'a
Y m U
J[
j
o
..:..................... o ~ Z V
x.r,. .... ....................~r.~....................................._......................
m° °c
g 8
'a 8 ~ 'a,
~ a: g t
•• W u
cZi:
..~ ................................a......... .....................i................................-:.......................
N ~ u3 8
8
8
N
N
n
n
o W
c+°~>
r
°o
in
c
u
m
l0
8
f`~')
v
v
V
O~
BP Alaska
Anticollision Report
Company: BP Amoco Date: 10/4/2005 Time: 08:33:42 Page: 1
Field: Northstar
Reference Site: Northstar PF Cu-ordinatc(NE) Refe rence: Well: NS14, True Nor th
Reference Welt: NS14 Vertical ('1'VD) Reference: NS14 55.5
Reference Wellpath: Plan NS14A
__
__ Dh: Oracle
NO GLOBAL SCAN: Using user defined selection & scan criteria Refe rence: PrlnClpal Plan & PLANNED PROGRAM
Interpolation Method : MD Interval: 20.00 ft Error Model: ISCWSA Ellipse
Depth Range: 10215.00 to 14656.81 ft Scan Method: Trav Cylinder North
~i Maximum Radius:10000.00 ft Error Surface: Ellipse + Casing
~ Survey Program for Definitive Wellpath
Date: 10/4/2005 Validated: No Version: 2
Planned From To Survey Toolcode Tool Name
ft ft
50.00 2620.00 Survey #1 (50.00-2620.00) (0) GYD-GC-SS Gyrodata gyro single shots - Used in Preference II
2620.00 10158.37
Survey #2 M
WD Sag (2620.00-129
MWD+SAG
MWD + Sag correction I
10158.37 14656.81 Planned: Pla n #4 V1 MWD+IFR+MS MWD +IFR + Multi Station I
Casing Points
~ MD 'l'VD Diameter Hole Size Name
ft ft in in
~!, 3296.00 3207.56 _
13.375 _ _
16.000 13 3/8" _ __
10214.54 8705.00
1 9.625 12.250 9 5/8"
12426.27 10759.51 7.000 8.500 7"
14656.81 11155.51 4.500 6.125 41/2" j
L- --
-- -- --
- - __ _ ---_ _
__ ---- -
_--- -- ,
-_ -
Summary
<_~_-_____ Offset Wellpath - ----> Keference Offset Ctr-Ctr No-Go Allowable
Site Well Wellpath MD MD Distance Area Deviation Warning
- ft ft ft ft ft
-
', Northstar PF -
-
NS05
NS05 V4 _
Out of range
', Northstar PF NS05 NS05P61 V8 Out of range
Northstar PF NS06 NS06 V35 Out of range
Northstar PF
I NS07 NS07 V34 11386.69 11740.00 3814.45 434.47 3379.98 Pass: Major Risk
~ Northstar PF NS07 Plan NS07A V3 Plan: PI 11640.30 11980.00 3813.98 418.98 3395.00 Pass: Major Risk ~
Northstar PF
NS08
NS08 V19
13914.52 11800.00
1144.06 324.28 819.78 I
Pass: Major Risk
Northstar PF NS09 NS09 V15 Out of range
Northstar PF NS09 Plan NS09A V5 Plan: PI Out of range 'i
I, Northstar PF NS10 NS10 V17 Out of range
Northstar PF NS11 Plan NS11 V8 Plan: Pla Out of range
~~, Northstar PF NS12 NS12 V30 Out of range
'i Northstar PF NS13 NS13 V15 13317.21 11940.00 854.97 364.67 490.30 Pass: Major Risk
Northstar PF NS14 NS14 V13 10319.53 10320.00 6.44 443.72 -437.28 FAIL: Major Risk
i Northstar PF NS15 NS15 V20 10245.60 10300.00 1796.37 167.58 1628.79 Pass: Major Risk
Northstar PF NS16 NS16 V40 10331.37 9880.00 2037.37 403.95 1633.42 Pass: Major Risk
'I Northstar PF NS17 NS17 V16 10248.07 11020.00 3605.53 86.25 3519.28 Pass: Major Risk
!i Northstar PF NS18 NS18 V15 10250.00 11560.00 4229.19 237.60 3991.59 Pass: Major Risk
~ Northstar PF NS19 NS19 V18 Out of range
Northstar PF NS20 NS20 V14 10261.21 12600.00 5565.51 231.73 5333.78 Pass: Major Risk
!i Northstar PF NS20 NS20P61 V11 10261.21 12600.00 5565.51 231.75 5333.76 Pass: Major Risk ~~
Northstar PF NS21 NS21 V60 10250.00 13320.00 6968.59 186.64 6781.95 Pass: Major Risk
Northstar PF NS22 NS22 V14 Out of range
Northstar PF NS23 NS23 V36 10676.12 11460.00 3989.76 318.03 3671.73 Pass: Major Risk
i Northstar PF NS24 NS24 V16 Out of range
Northstar PF NS25 NS25 V4 Out of range
Northstar PF NS25 NS25P61 V10 Out of range ~,
Northstar PF NS25 NS25PB2 V4 Out of range
Northstar PF NS26 NS26 V24 Out of range
', Northstar PF NS27 NS27 V30 Out of range
Northstar PF NS28 NS28 V8 10262.85 9960.00 240.06 191.08 48.98 Pass: Major Risk
~' Northstar PF NS29 NS29 V23 10444.33 11000.00 2953.37 312.92 2640.45 Pass: Major Risk
Northstar PF NS30 Plan NS30 V1 Plan: Pla 10247.68 10360.00 2607.77 139.47 2468.30 Pass: Major Risk ,i
Northstar PF NS31 NS31 V15 Out. of range ~
Northstar PF NS32 NS32 V12 Out of range
~~ Northstar PF NS34 Plan NS34 ST OP V1 Pla Out of range
Northstar PF NS34 Plan NS34 V2 Plan: Pla Out of range
Seal Island SEAL-A-01 SEAL-A-01 V4 10516.46 10600.00 1412.00 330.75 1081.25 Pass: Major Risk
Seal Island SEAL-A-02 SEAL-A-02 VO Out of range
~! Seal Island SEAL-A-02 SEAL-A-02A V4 Out of range
~, Seal Island SEAL-A-03 SEAL-A-03 V4 Out of range i
BP Alaska
Anticollision Report
Company: BP Amoco
Fictd: Northstar
Reference Site: Northstar PF
Reference Welt: NS14
Reference ~Yellpa th: Plan NS14A
Summan
<- __
Offset Wellpath ----->
Site Well Wellpath
Seal Island SEAL-A-04 SEAL-A-04 V4
Date: 10/4/2005 Time: 08:33:42 Page: 2
Co-ordinate(NE) Reference: Well: NS14, True North
Vertical ('fVD) Reference: NS14 55.5
Dh: Oracle
Reference Offset Ctr-Ctr No-Go Allowable
MD MD Distance Area Deviation Warning
ft ft ft ft ft
Out of range
-~
•
TREE: ABB-VGI 5 1/8" 5ksi N S 14 - P a n d A
WELLHEAD: ABB-VGI 13-5/8"
Multibowl Sksi
13 3/8" TAM Port Collar
at +/-1600'MD
13 3/8", 68#/ft,
L-80, BTC (81 3296.5'
9-5/8" 47#
L-80 BTM-C @ 10908'
4.5" X NIPPLE, @ 12261'
3.813" ID
4.5" XN NIPPLE, @ 12318'
3.725" ID
4.5" WLEG, @ 12330'
3.958" ID
7", 26#/ft L-80, BTC-M
@ 12471'
PBTD (~ 12931' N
TD(~13018'MD
~' e
`~ •.
~~ ~ ".
••
y
i
. • .
''...
^~
• '
••
~ •
., .~~
,~
• .•.:
ORIGINAL KB. ELEV = 55.9'
KB-BF. ELEV = 40.2'
CB. ELEV = 16.0'
BRIDGE PLUG (82 10214'MD
7" LINER TOP @ 10741'
7" PACKER,13 Cr @ 12491' MD
4.5" LINER TOP @ 12319' MD
4.5" PROPOSED TOP OF
CEMENT @ 12426' MD
Top of Squeezed Perfs @ 12776' MD
Top of Perfs @ 12860' MD
4.5", 12.6#, 13Cr Vam Ace
DATE REV. BY COMMENTS Northstar
/ / P H ro ose an WELL: NS14
API NO. 50-029-23026-00
RP Exploration (Alaska)
TREE: ABB-VGI 5 1/8" 5ksi
WELLHEAD: ABB-VGI 13-5/8"
Multibowl 5ksi
13 3/8" Stage C
at +/-1638` MD
L-80, BTC @ 3296
5.5", 17#/ft, 13-Cr, Fox
TUBING ID: 4.892"
CAPACITY: 0.0232 BBL/F
4.5", 12.6#/ft, 13-Cr, Vam-~
TUBING ID: 3.958"
CAPACITY: 0.01522 BBLI
9-5/8" 47#
L-80 BTM-C @ 10908'
4.5" X NIPPLE, @ 12
4.5" X NIPPLE, @ 1230
3.81
4.5" XN NIPPLE, @ 12311
3.7~
4.5" WLEG, @ 1233
3.9:
@ 12471' MD
PERFORATION SUMI
REF LOG: LWD (2/4/2002) [Tie-in
ANGLE AT TOP PERF: ?
SQE SPF INTERVAL MD Op
2.88 6 12766 - 12916
2.88 6 12860 - 12910
PBTD @ 12
TD @ 1301 _
NS14
GCB. ELEV = 55.51'
KB-BF. ELEV = 39.61'
BASE FLANGE ELEV = 15.9'
SSSV @ 1957' MD w/ HRC2
nipple - 4.562" ID
5" GLM @ 4944` MD (asos' ND)
~ 4.62" ID
2" x 4 1/2" XO ~ 10147' l1AD
.INER TOP @ 10741' MD
' Fber Optic Transducer
i8 `1D @ 12241.5` MD,
i2' TVD (Sensor ELM ND =
4)
<ER S-3 PACKER,13 Cr @
`MD
5" LINER TOP @ 12319' MD
5", 12.6#, 13Cr Vam Ace
DATE REV BY COMMENTS DATE REV BY COMMEMS
01!03/02 JAS NS14 PROPOS®
02/13/02 EMF DEPTH UPDATES
02/25/02 EMF ADDPERF
12/20/02 EMF UPDATED KB 1JF0
05/06/05 RMHITLH PERF SQZ 8 PERT
NORTHSTAR UNIT
WELL: NS74
PERMIT No: ??
API No: 50-029-23026-00
SEC T N R E
TREE: ABB-VGI 5 1/8" 5ksi ~ S ORIGINAL KB. ELEV = 55.9'
WELLHEAD: ABB-VGI 13-5/8" NS14 Proposed Sidetrack KB-BF. ELEV = 40.2`
Multibowl 5ksi ~ CB. ELEV = 16.0'
13 3/8" TAM Port Collar ~ 4-1/2" SSSV 1000'
13-3/8" 68# L-80 BTC
@ 3297`TMD
4-1/2" GLM @ 4940 TMD`
7" LINER TOP @ 10065' MD
9-5/8" Window Cut @10215'
7" PACKER,13 Cr ~ 12216' MD
4-1/2" X Nipple @ 12236'
4-1/2" XN Nipple @ 12256'
~ 4.5" LINER TOP @ 12276' MD
7", 26#/ft L-80, Hydril 521
• @ 12426`
7" LINER TOP @ 10741` MD
9-5/8 47# L-80 BTC _ • T ~~ ; ..-1
@ 10908'TMD 4.5", 12.6#, 13Cr Vam Top
7" PACKER,13 Cr @ 12491' MD @14657` TMD
4.5" LINER TOP @ 12319' MD
7", 26#/ft L-80, BTC-M 4.5" PROPOSED TOP OF
@ 12471' CEMENT @ 12426' MD
•~
,a
Top of Squeezed Perfs @ 12776` MD
~, Top of Perfs @ 12860' MD
•
PBTD (~ 12931' MD
TD @ 13018' MD 4.5", 12.6#, 13Cr Vam Ace
Northatar
WELL: NS1+ Sidetrack
API No: 50-029-23026-00
8P 6rploratlon (Alaska)
j r'
•
SC
I ~
O
N Q.
N
f
~.
W
H
Q
~ ~(/~•.
~:
Y.
C.7 ~:
0
t
a
` ~
' .J'
c
v
i ~
~ c0
~
N
+.
y ~ J ~
f0
ti
~.? cv n.,
'-
zz c11
~a"'°'
z~~ ~'
WO~~
Q ,~ ~;
0
~a^
0 or ~ w ~ o
Q ~
~ c0
o
Q
~~~~ `°
~i o
W ~ ~ o v ru
2
Z
V o
p
~ ~
~ ~
~ L!1
ymaQ Q~
~ y ~
~ a
ap c
~- Q w
5 ~~
~
• •
TRANSIVIITAL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/pAg~,GRAPHS TO
SE INCLUDED IN TRANSvIITTAL LETTER
WELL 1V'AME /~ ~ ~,7`
PTD# ~ iJ,S-- d 2„
CHECK WHAT i, ADD-ONS "CLUE"
APPLIES (OPTIONS)
j MULTI ~ The permit is for a new wellbore segment of
LATERAL existing well ,
~ Permit No, API No.
~ (If API number ~ Production should continue to be reported as
I~ last two (2) digits ' a function of the original API number stated
I are between 60-69) above.
PILOT HOLE , In accordance with 20 AAC 25.005(fj, all
(per ~ records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (~0 -
70!80) from records, data and togs acquired
for welt (name on permit).
SPACING ,The permit is approved subject to full
EXCEPTION ~ compliance with 20 AAC 25.05. Approval to
perforate and ~roduceliniect is contingent
upon issuance of a conservation order
approving a spacing exception.
(Company Name) assumes
the liability of any protest to the spacing
exception that may occur.
DRY DITCH ~ Alt dry ditch sample sets submitted to the
SAMPLE ~ Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
Rev: 04/01/05
C\jodyltransm ittal_checklist
~ •
^ ^
w ~ ,
rn o
a~ a ,
N N ,
~ D ~ ~ ,
o ~
a
~ ,
,
,
Q ~ ~~ ~ ~~ ~~ ~ ~~ ~ ~~ ~ ~ ~~ ~~ ~ ~~ ~~ ~~ ~ ~~ ~~ ~ ~~
O ~ ,
o ~ ,
w ~ ~ ~ ,
~ O ~ ~ ~ ,
~
E O ~ ~ ,
,
m ~ ,
rn ~ ,
a ,
O ~ ;
•~
~
~
~ ~ ~ ;
~ ~ ;
Z ~ ,
~ ,
~ LL
; •~;;
~ a ,
', o, ~ ~ ~ ~ ', ~ ', ', '~ ', ~ ~ ~ ~~ ~~ ~ ~'~
~ ~ ~.,
~ ~
O oo °
~ .~
o, ~
~
~
~
~ m'
~ ~ ~,
Z a N ~ oD ,
o -_, ~ ,
t6 U (6. ~ Q ~ ~ ~ M ~ ~ ~, ~ ~ ~ ~ ~ ,
~ ~ ~ ~ O
~ ~ ~ ~~ ~ ~ ~ ~ ~ ~
N~
N, N~
N, Nh N~ t/Y
N, N, N, N~ N~ N~ W~
N, N N
N, t/b N~ W, W
N, N
N
N
Q
Q
Q
Q
Q
Q
Q
Q N~
N f/h db N~
N
N
N N~ Uh N~ N~ W N~
N
N
Q
N
N
N
N ~
O
Q
O
Q
Q
Q
Q /
N
fl_
~",
~,
~-, ~', ~, ,
~', ~', ~, ~, ,
,
~, ~', ~, ~ ,
,
,
,
Z, z, Z, Z ,
,
,
,
Z, Z, Z, Z, ,
~', ,
,
,
~, ~, ~, ,
,
,
,
,
,
,
~', Z, ~', ~, `r, ~', ~, ,
,
Z, Z ,
Z, ,
Z, ,
,
Z, Z, ,
Z
T
j N I
a
~ K
U N ~ ~, ,
~ c
~ ° ~ ~ ,
~ ~ ~ q ~ ,
N
~, o
, O. o,
, - v, T a
o ~ ~,t o aE
_
3
~ ' M' .~
O` ~ _~ ~ J
~'
~
Q
~
~ ~ f6
~ ~~
~ ~
~ ~
~ ~ ~
~ ~ ~~ N
~~ N' W N~
N. ~ W ~,
~ ~ pW~ ~
~ ~ U• ~
~ >
~ O'
~ O:
~ ~ ~ ~: ~ ~
~ ~ N. ~ O. N
~ ~
~ O,
N,
~
~ O
Q
x
~ ~ ~ ~ C'
7. ~ ~ ~
~ ~ ~ ~ y
~ O. G Q N.
TLL.+ C w~ ~
~ ~~ ~ Q
up f0. ~ ~ f6. ~ V,
~ ~ ~ ~ ~~ ~ J
~ "O' ~~
p' ~ O~ `~
Y V
Z ~ 07 3~ •C ~ ~ O. '. a 3
. ~, ~, O .C~ ~
~ ~, O N. ~ ,
D' ~ O, ~ ~ fl: ~ 03~
~ ~ ~, V~ N, ~ y,
a' U
~ ~ C,
~ ~
, ~~ O, ~
L• ~ N'
f0~ T
,
, W' ~p .~.' Qr N•
7. ~, N.
, '
'Q~ ~ ~
~
,
' ~,
L• .
~~ ~, ~,
~~ 4 ~ M, a'
~ ~, try
'
'
' ~ O'
~
Q' _,
' O,
N
' ~
' N•
Q Z
~
~ ._
~~
OS
o' c, ~~ `
Z
a y, c' v y
m. ,a~~
~ a, G
~
(n
~~ o. c.
°,
C
m, a ¢
f/1
p
7
o. ~ a~' ~ ~, a,
~ c N
c' (
A
~' N
c' ~'
o ..
~ ~ ~ ~~ ~~ _ ~; ~' C' E~ ~ _
f` ~~ O. ~, ~ C. C~ y~ ,>, ~, ~~ C~ ~ N~ ~~ ~~~ ~
~ C, N, .~.+~ ~ ~ N' _C Ll ~ C
~ ~ ~ ~ ~ w
~ ~, ~~ ~, ~ a~ V, ~, N N ~ ~, 1. p, O. ~1 3~ (~, fl< a. _
~ N. U. O, Qj~ d~ ~ a. 3. ~~ >~ f6' ~' ~ N N
~ , o,
a c.
N'
° ~ c o
O 7 7 w °
-O t0
m c, :?,
Y t6
~~ a,
O ° m,
~ c ° m Q. m.
O' ~ N' N'
E
a m N
a' -o
T o. a~ o. a~'
° a~ ,~
G
Z Q a~; ~' a ~, c
m a' d a o
a c, o,
. ~
~ ,
-' ° c; o: `~ Z' °; , °' 3'
~'
°
m
o o ~' r' m
~ 3' ~ '
3 .~ E
N, °, :°
C' ~' ° a
m'
N, ~ 4 °, L t,
~ -p m. ~
~ 'O~ N~ v' ~
N~ tll' .
y~
G ° o
M,
~ ~ _
,
, rn
N' o
Q Vl, ~.~ N~
N~
' a 3'
~ o'
} ~ °'
N '
O c E
W
°
a M
c
w ~ N,
~ > ~
,
~
•
~ ~
~~ c U'
> ~'
o
, =
'
~ ~
_
°=
°
° ~
O, i, ~,
° t~
Z' ~.
-~ U
o O_
n
~-
'
"° .
' ~'
o,
° i
a
~'
°o' ~ a v
°~ ~' ~' a
c ~
~' U~ o.
.
' ~
'x' a
°
v' ~ -
~ ~ a~
o.
~'
m' ° rn a w rn c.
uy
o a.
~,
~ N
o' v°i, a~
o
. a
i a
d -
o
N
4 ~ ._
~,
4 Q ;
N a o
ai ai ' v
~
U
` _
N
~i ~
'
v.
m. .
E. f6 0.
'
o, °~ ~ ~
f4' . N~ N~ fl.
4 !~, !~, m .
~
w c. o.
~ ~ ~
ai o: m m
'
m fd
m m' , G
o ~'
aS ~, ~ 3.
~
a ,
2, ~° N•
~, O.
a' p,
~, o. L•
n
-° O m, m c_
Q.
~ p. ~ 3
~ i°,
~
~
Q c, ~
~
~ S " of ° °
N
> c Y ui _s,
g ~ a~ %
~
0
d
N
t ~•. o;
O U
~ ~ >, '_' ~
LL ~ (6' a~ ~ ~~ ~~
a> ~' U~
C
a> ca ,
,
N' , ~,
u
~ N' '~, N ~
$ .~ ~~ L,
N , ~
~~
.
-r N~
:° o N
3
~~ m ~ C•
a~ Cd C'
c ~.
° ~, ,
~, ~, ~, o z c G,
E ~,
,
~ ~ ~ ~,
o ci _, ~ o,
,
°
, ~° c, , o
m v m,
c
}-- ~
lA ~'
..; c 3' v' v
a~, o, o, v' ~' ~, o
a a~ m. o v~ ~,
~ v~ ~
~, ~~
o, ,
~ a~ ~, ~ _~
3, ~~ ~~ •-,
~ ~ v, ¢ ~~ -
~ ~, ~
~, r,
3
ui c. <?
N ~ v~ ~, ,
°- ~, .
~,
d
_I m E' ~
~; ,
6 a a
~ m
~ ~ c a
a
3, y ~ ~ I-, I-
c ~-; 'v ~ ~ ~
~
~ ? ~; a'
a; o; o' a ~' E; a
m; ~
~; ~' m
Y ~, ~~ a~ ~ ~
.
c,
~ ~' ~
,
>,
°, a' a
~' a~,
fl. a~ a~ m ~
- U,
~' .
o, ° ~ ~' ~, °, a, ~ ,
,
a, ~ O, O a,
~
0' ~
'
' a~, ~ .
,
a~, m. ,
o. O
U c a, J, ~,
, , tn, -, O, O, a; o.; U Q. o.. Q. U. ~ U, U. U. U. Q - m. m. U.
;
Q. ~ ~
; ~ a. ~ ~, ~, U.
W a
_ ~
O
~
N
M R~
(O
I~ W O O N M
~
~ `cY ~ CO
~ 00 O O
N N N
N M e} ~f5
N N N CO f~ OD W O N
N N N N M M
M M V
M M ~
M (O
M I~ W
M M O
M
U
U __ ~ _ _,
u~ ~n
F-
C
C °o
w N °o
r N °o
O N a~
U O
p
N _
N
w N ~
f ~ r
C ~ ~ ~
N p N
'N
~ 6
y ~ ~ ~ ~ ~ p
O o
J
c i a
i ~"1}
J ik a s ~ a~ ~ O a~ V ---~.
'?i d Q Q ~ lL Q~ (~ Q~