Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout205-104C:\Users\kmjunke\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\99RGP1KB\2022-01-29_22520_KRU_1C-28_ProductionProile_Transmittal.docx DELIVERABLE DISCRIPTION Ticket #Field Well #API # Log Description Log Date 22520 KRU 1C-28 50-029-23270-00 Production Profile 29-Jan-23 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ ______________________________________ Date received Signature PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL :READ-Anchorage@readcasedhole.com WEBSITE :WWW.READCASEDHOLE.COM Originated: Schlumberger PTS- PRINT CENTER 6411 A Street Anchorage, AK 99518 (907) 273-1700main (907)273-4760fax Delivered to: AOGCC n ATTN: Natural Resources Technician 11 Alaska Oil & Gas Conservation Commision 333 W. 7th Ave, Suite 100 41,h Anchorage, AK 99501 20 31 04 30 53 TRANSMITTALOATE30-May-19 TRANSMITTAL N30May19�IW01 I A Transmittal Receipt signature confirms that a package (box, envelope, etc.) has been received and the contents of the X package have been verified to match the media noted above. ame Signat a Date specific content of the CDs and/or hardcopy prints may or may not have been verified for correctness or quality level at this return via courier or sign/scan and email a copy to S hlumberger and CPAL point. Schlumberger -Private SERVICE ORDER EW -00021 r r KUPARUK RIVER r WL r PPROF r• FINAL FIELD r• r 7 -May -19 r50-029.23270-00 1 73M17 50-029-23254-00 EBSI-00005 KUPARUK RIVER WL WFL L FIELD 8 -May -19 1 50-029-21076-00 EBSI-00006 KUPARUK RIVER WL Caliper FIELD 10 -May -19 1 50-029-21097-00 ECNM-00001 KUPARUK RIVER WL LDL :�FINAL L FIELD 12•May-19 50-029.21729-00 EOSH-00044 KUPARUK RIVER WL Caliper L FIELD 12 -May -19 1 3Q-04 50-029-22219-00 EOSH-00045 KUPARUK RIVER WL WFL-LDL L LOILD 1 3A-01 50-029.21412-00 EOSH-00046 KUPARUK RIVER WL PPROF FINAL FIELD 14 -May -19 1 3M-17 50-029-21729.00 EOSH-00047 KUPARUK RIVER WL LDL FINAL FIELD 15 -May -19 1 1L-12 50.029-22033.00 EOSH-00051 KUPARUK RIVER WL PPROF FINAL FIELD 21 -May -19 1 1B-14 50-029-22452-00 DWUJ-00098 KUPARUK RIVER WL LDL FINAL FIELD 24 -May -19 1 RECEIVED MAY 3 0 019 10 I A Transmittal Receipt signature confirms that a package (box, envelope, etc.) has been received and the contents of the X package have been verified to match the media noted above. ame Signat a Date specific content of the CDs and/or hardcopy prints may or may not have been verified for correctness or quality level at this return via courier or sign/scan and email a copy to S hlumberger and CPAL point. Schlumberger -Private F:\LaserFiche\CvrPgs_Inserts\Micro6lm Maciter.doc 1 ? tiL~ DATA SUBMITTAL COMPLIANCE REPORT 1 /29/2008 Permit to Drill 2051040 Well Name/No. KUPARUK RIV UNIT 1C-28 Operator CONOCOPHILLIPS ALASKA INC API No. 50-029-23270-00-00 MD 19367 TVD 6560 Completion Date 11/17!2005 Completion Status 1-OIL REQUIRED INFORMATION Mud Log No DATA INFORMATION Types Electric or Other Logs Run: GR/Res, Dens/Neu Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name D D Asc Directional Survey D D ~~,fL Directional Survey D Lis 13434 Induction/Resistivity D 13434 Ind ction/Resistivit u y IV D Lis 13433 Induction/Resistivity I Rp 13433 Induction/Resistivity Well Cores/Samples Information: Name ADDITIONAL INFORM~ON Well Cored? Y Chips Received? Y'/'A'"-` Analysis ~Y7-I~ Received? Samples No Log Log Run Scale Media No Current Status 1-OIL UIC N Directional Surv Yes (data taken from Logs Portion of Master Well Data Maint Interval OH / Start Stop CH Received Comments 0 0 1/17/2006 DEFINITIVE SURVEY 0 0 1/17/2006 DEFINITIVE SURVEY P61 9203 15163 %~%} ( 1/31/2006 GR/EWR4/ROP/PWD/GEO PILOT 9203 15163 /~;) t 1/31/2006 GR/EWR4/ROP/PWD/GEO PILOT 9203 19309 1/31/2006 GR/EWR4/ABI/CNP/SLD/R OP/PWD/GEOPILOT 9203 19309 1/31/2006 GR/EWR4/ABI/CNP/SLD/R OP/PWD/GEOPILOT Sample Interval Set Start Stop Sent Received Number Comments Daily History Received? _(7'~~"'~"~ Formation Tops `~-~'" s Comments: DATA SUBMITTAL COMPLIANCE REPORT 1/29/2008 Permit to Drill 2051040 Well Name/No. KUPARUK RIV UNIT 1C-28 Operator CONOCOPHILLIPS ALASKA INC API No. 50-029-23270-00-00 MD 19367 TVD 6560 Completion Date 11/17/2005 Completion Status 1-OIL Current Status 1-OIL UIC N ----- Compliance Reviewed By: _ _ __ __ _ _ Date: ~~ • ConocoPhillips ~~~ P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 August 23, 2007 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West 7~' Avenue, Suite 100 Anchorage, AK 99501 Dear Mr. Maunder: RECEIVED AUG 2 9 2007 Alaska Oil & Gas Cons. Commission Anchorage ~,4d~ Enclosed please find a spreadsheet with a list of wells from the Kuparuk field (KRi1). Each of these wells was found to have a void in the conductor. These voids were filled with a corrosion inhibitor, engineered to prevent water from entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. The corrosion inhibitor/sealant was pumped between August 19 & 21, 2007. The attached spreadsheet presents the well name, top of cement depth prior to filling, and volumes used on each conductor. Please call me at 907-659-7043, if you have any questions. Sincerely, G~i'T~ M.J. veland ConocoPhillips Well Integrity Projects Supervisor • • ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Kuparuk Field Date 8/21 /2007 Well Name PTD # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date - ft bbls ft al 1 D-28 204-237 18" N/A N/A N/A 10 8/19/2007 1 D-30 200-104 24" N/A N/A N/A 6.5 8/19/2007 1 D-34 200-143 14" N/A N/A N/A 4 8/19/2007 1D-12 199-084 1" N/A N/A N/A 1.7 8/20/2007 1 D-14 199-089 2" N/A N/A N/A 3.4 8/20/2007 1 D-140 200-136 29' 9" 3.4 12" 12/16/2006 14.5 8/20/2007 1 D-141 200-112 SF N/A N/A N/A 0.5 8/20/2007 1C-11 199-172 _ SF NA NA NA 0.5 8/21/2007 1 C-12 196-177 SF NA NA NA 0.5 8/21 /2007 1C-15 198-229 SF NA NA NA 0.5 8!21/2007 1C-16 198-246 22" NA NA NA 8 8/21/2007 1 C-17 198-224 17" NA NA NA 1.7 8/21 /2007 1G18 199-005 SF NA NA NA 0.5 8/21/2007 1 C-24 201-248 20" NA NA NA 11 8/21 /2007 1C-26 199-051 3" NA NA NA 0.85 8/21/2007 1 C-27 199-043 4" NA NA NA 1.7 8/21 /2007 1G28 205-104 SF NA NA NA 0.5 8/21/2007 1C-117 201-121 26" NA NA NA 12.3 8/21/2007 • WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Ceresa Tolley 333 West 7`h Avenue, Suite 100 Anchorage, Alaska RE: MWD Formation Evaluation Logs 1 C-28, January 23, 2006 AK-MW-3922104 ~~ x.05-10~-. 1 LDWG formatted Disc with verification listing. API#: 50-029-23270-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 Date: / ' D Signed: ~ ~ r • WELL LOG TRANSMITTAL To: State of Alaska January 23, 2006 Alaska Oil and Gas Conservation Comm. Attn.: Ceresa Tolley ~ 333 West 7th Avenue, Suite 100 / ~ ~~ ~- Anchorage, Alaska ao~- io4- RE: MWD Formation Evaluation Logs 1C-28 PBI, AK-MW-3922104 1 LDWG formatted Disc with verification listing. API#: 50-029-23270-70 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 Date: (31 OLo Signed: ~ ~ ~1' • ConocoPhillips January 5, 2006 Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Subject: Well Completion Reports for 1 C-28, 1 C-28L1 Dear Commissioner: Randy Thomas Kuparuk Drilling Team Leader Drilling & Wells P. O. Box 100360 Anchorage, AK 99510-0360 Phone: 907-265-6830 JAN 1 1 l.i~i~~ Alaska Oil ~- 6as~Ca~sQG~mission pnc 9 ConocoPhillips Alaska, Inc. submits the attached Well Completion Reports for the recent drilling operations of the Kuparuk wells 1 C-28, 1 C-28L1. If you have any questions regarding this matter, please contact me at 265-6830 or Tim Billingsley at 265-6531. Sincerely, R. Thomas Kuparuk Drilling Team Leader CPAI Drilling RT/skad STATE OF ALASKA ~ ~GCEt V ~D ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT~~;~D~ L~~ 1a. Well Status: Oil ^/ Gas Plugged Abandoned ^ Suspended WAG ^ A!$$ 20AAC 25.105 20AAC 25.110 GINJ ^ WINJ ^ WDSPL ^ No. of Completions _ Other _ ~.~I~I~~ COA$. C0111(1'MSb10D DevelopmerttC~].8ge Exploratory ^ ServicAeAli~t ryU~ e1 Stratigraphic Test ^ 2. Operator Name: ConocoPhillips Alaska, Inc. 5. Date Comp., Susp., orAband.: November 17, 2005 12. Permit to Drill Number: 205-104 / 3. Address: P. O. Box 100360, Anchorage, AK 99510-0360 6. Date Spudded: ~~C ~~ ~ September 18, 2893 13. API Number: 50-029-23270-00 / 4a. Location of Well (Governmental Section): ~ Surface: 1548' FNL, 1114' FWL, Sec. 12, T11N, R10E, UM 7. Date TD Reached: November 8, 2005 ~ 14. Well Name and Number: 1C-28 At Top Productive Horizon: 261' FNL, 2758' FEL, Sec. 17, T11N, R11E, UM 8. KB Elevation (ft): 40' RKB 15. Field/Pool(s): Kuparuk River Field Total Depth: 686' FNL, 1866' FWL, Sec. 16, T11 N, R11 E, UM 9. Plug Back Depth (MD + TVD): Kuparuk Oil Pool 4b. Location of Well (State Base Plane Coordinates): ~ Surface: x- 562121 ~ y- 5968689 Zone- 4 10. Total Depth (MD + TVD): ` 19367' MD / 6560' TVD ~ 16. Property Designation: , , ADL 28242, 28243, 28244, 25649 TPI: x- 573772 y- 5964802 Zone- 4 Total Depth: x- 578401 ~ y- 5964424 ~ Zone- 4 11. Depth where SSSV set: nipple @ 507' 17. Land Use Permit: ALK 2292, 3814, 2293 18. Directional Survey: Yes ~ No 19. Water Depth, if Offshore: N/A feet MSL 20. Thickness of Permafrost: 1956' MD 21. Logs Run: GR/Res, Dens/Neu 22. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 16" 165# X-42 40' 120' 40' 120' 42" 500 sx AS1 10.75" 45.5# L-80 40' 9222' 40' 4513' 13.5" 1076 sx AS Lite, 590 sx LiteCrete 7-5/8" 29.7# L-80 40' 14781' 40' 6443' 9-7/8" 280 sx Class G 4.5" 12.6# L-80 14590' 19350' 6395' 6561' 6.75" slotted liner 23. Perforations open to Production (MD + TVD of Top and Bottom 24. TUBING RECORD Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET 4.5" 14633' 14590' slotted liner from 14796'-15774', 16076'-16638', 16789'-19315' MD 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED n/a 26. PRODUCTION TEST Date First Production December 29, 2005 Method of Operation (Flowing, gas lift, etc.) Gas Lift oil -shares production with 1 C-28L1 Date of Test 1/1/2006 Hours Tested 5.5 hours Production for Test Period--> OIL-BBL 787 GAS-MCF 800 WATER-BBL 31 CHOKE SIZE 100 Bean GAS-OIL RATIO 1214 Flow Tubing press. 460 psi Casing Pressure 1240 Calculated 24-Hour Rate -> OIL-BBL 3195 GAS-MCF 3878 WATER-BBL . 137 OIL GRAVITY -API (corr) not available 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or wa se crate sheet, if necessary). Submit core chips; if none, state "none". ~ ~{~~; ~ ~Qn~ I NONE ~~ ~IE~ Form 10-407 Revised 12/2003 j CONTINUED ON REVERSE t 5~ y /~ ~.. ~ .. 3 ~.-1 5,s ( ~ 28. 29. GEOLOGIC MARKERS FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". 1 C-28 Top Kuparuk C4 14702' 6497' Base Kuparuk C4 19318' 6564' N/A 30. LIST OF ATTACHMENTS Summary of Daily Operations, Directional Survey 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Tim Billingsley @ 265-6531 Printed Nam Rand om s Title: Greater Kuaaruk Area Drilling Team Leader _ (~~ ~~ 6 Signature Phone ~~ 6 ~ S ~ Date INSTRUCTIONS Prepared by Sharon Allsup-Drake General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: True vertical thickness. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other (explain). Item 27: If no cores taken, indicate "none". Item 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 • ConocoPhillips'Alaska Page`1 of a4 Opera#ions Summary Report Legal Well Name: 1C-28 Common Well Name: 1 C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date .From - To 'Hours ' Code Sub. Phase Description of Operations Code 9/11/2005 00:00 - 03:00 ~ 3.001 MOVE j OTHR ~ MOVE I; Release rig @ midnight 9/10/2005. f/ 5.1 mile move f/ 1 E-170 to 1 C-28 03:00 - 06:00 3.00 MOVE MOVE 06:00 - 09:00 3.00 MOVE OTHR 09:00 - 10:30 ' 1.50 MOVE ~~ MOVE 10:30 - 11:30 1.00; MOVE ' MOVE 11:30 - 15:00 3.50 RIGMNT RGRP 15:00 - 17:00 2.00 MOVE MOVE 17:00 - 17:30 0.50 MOVE i RGRP 17:30 - 18:00 0.50' MOVE 'MOVE 18:00 - 22:00 4.00 MOVE MOVE 22:00 - 22:15 0.25 MOVE OTHR 22:15 - 23:00 0.75 MOVE ; MOVE 23:00 - 00:00 1.00 MOVE MOVE 9/12/2005 00:00 - 00:30 0.50 I MOVE MOVE 00:30 - 02:00 ! 1.50 I MOVE ! OTHR 02:00 - 03:00 1.00 MOVE MOVE 03:00 - 13:30 10.50 MOVE OTHR 13:30 - 14:30 1.00 MOVE j MOVE 14:30 - 16:30 I 2.00 I MOVE I MOVE 16:30 - 17:30 ~ 1.00 ~ MOVE MOVE 17:30 - 18:00 0.501 MOVE OTHR 18:00 - 20:00 j 2.00 I MOVE OTHR 20:00 - 22:00 ' 2.00'; MOVE OTHR 22:00 - 22:15 0.25 'MOVE SFTY 22:15 - 22:45 0.50 MOVE MOVE 22:45 - 00:00 I 1.25 i RIGMNTI RGRP 9/13/2005 100:00 - 00:30 I 0.50'. MOVE I MOVE 00:30 - 01:30 '. 1.00 MOVE I MOVE 01:30 - 01:45 0.25 , MOVE ': .MOVE 01:45 - 03:00 1.25 MOVE MOVE 03:00 - 03:30 ~ 0.50 MOVE MOVE 03:30 - 06:00 ~ , 2.50 , MOVE . MOVE ' Move pits off of mats, move mats f/ pit module and spot on road. Blow down steam to sub module. MOVE Move rig sub off of well 1 E-170. Stage rig down pad. Move pits down ;pad. MOVE Remove Diverter system f/ cellar area. Clean up around cellar area, pick up mats and herculite. Stage mats on road. MOVE Move small office/camp f/ 1 EPad to 1 C pad 5.1 miles. MOVE ,Move rig off 1 E pad. MOVE Trouble shoot and work on sub module moving system. MOVE Move rig off 1 E pad. MOVE Trouble shoot and work on sub module moving system. MOVE Move rig off 1 E pad. MOVE Move f/ 1 E pad towards 1 C pad. MOVE Air up tire Left rear outside on drilling module f/ 115 Ib to 120?? lbs. MOVE Move both modules. Right front outside tire went down on drilling module. MOVE Set drilling module down. Pull out plywood. Fill hole w/ cut off 3" x 12" wood. Hook up Peak Sow to assist moving drilling module. Note: 1.4 mi to Spine Road MOVE Move drilling module about 50 yds after Right front wheels went through road. Left Rear wheels went down in road. MOVE Cut 3" x 12" lumber for cribbing. Crib under Left rear wheels. Hook iweighted Peak SOW to assist in pulling out drilling module. MOVE Move sub ahead 50 yds, set on rig mats which were already layed. MOVE Remove plywood f/ road so as to lay mats where standing water was by road. MOVE ;Moving drilling module w/ Peak Sow assisting to Flare pit behind CPF 1. Unhook SOW. MOVE Move drilling module trough gravel pit, Hook up SOW to move up incline in gravel pit. Unhook SOW. MOVE ;Move drilling module to in front of CPF1/ KOC. MOVE Kuparuk crew change while sitting in front of KOC. Inspect moving system, tires, hinges, cylinder bolts, fuel module. MOVE Continue trouble shooting throttle controls on drill module. Picking up ;plywood on road where drilling module fell through. Roads and pads repairing and compacting road where module fell through. Stagging mats to apply on road where compacted. MOVE Lay approx 34 mats on road in area of water standing on side of road. MOVE ~ PJSM on moving pit module w/ toolpusfter, tourpusher and crew. MOVE Move pit module approx 1200'. Crew noticed a leak of hydraulic oil from right rear side of module in wheel well. MOVE Fix hydraulic leak on right rear of pit module. Replace pipe penetration through wall. Note: Security was notified approx midnight and Environmental was notified. MOVE ,Finish fixing hydraulic leak on right rear of pit module. Replace pipe penetration through wall. Wipe very little oil on mats. MOVE ~ Move pit module to flare pit behind CPF1. MOVE .Maneuver pit module around corner heading to gravel pit. MOVE 'Move pit module through gravel pit to Spine road. MOVE ~ Move pits f/ spine road down to in front of CPF1 / KOC. MOVE Relocate mats to use on 1 C road. Check tires, drives, pumps, hinges Printed: 12/30!2005 9:34:03 AM • ConocoPhillips Alaska Operations Summary Report Page 2 of 44 Legal Weli Name: 1C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To !Hours Code ' Code Phase ~ Description of Operations 9/13/2005 9/14/2005 9/15/2005 9/16/2005 17:30 - 18:00 18:00 - 18:45 18:45 - 20:30 .20:30 - 00:00 9/17/2005 00:00 - 04:30 04:30 - 12:30 ~ 12:30 - 13:30 113:30 - 14:00 03:30 - 06:00 2.50 ~ MOVE MOVE 06:00 - 00:00 18.00 MOVE !MOVE 00:00 - 01:15 1.25 MOVE MOVE 01:15 - 05:30 4.25 MOVE MOVE 05:30 - 13:30 8.00 MOVE MOVE 13:30 - 15:30 2.00 ' MOVE ':MOVE 15:30 - 20:45 5.25 MOVE ~ MOVE 20:45 - 21:30 0.75 MOVE MOVE 21:30 - 23:00 1.50 , MOVE MOVE 23:00 - 00:00 1.00 MOVE 'MOVE 00:00 - 05:30 5.50 MOVE MOVE 05:30 - 06:30 1.00 MOVE MOVE 06:30 - 08:00 1.50 , MOVE ,MOVE 08:00 - 12:00 ~ 4.00 ~ MOVE ;MOVE 12:00 - 13:30 1.50 MOVE MOVE 13:30 - 17:00 3.50 MOVE MOVE 17:00 - 18:30 ' 1.50 MOVE 'MOVE 18:30 - 00:00 5.50 MOVE MOVE 00:00 - 09:00 9.00 MOVE MOVE 09:00 - 10:30 ~ 1.50 i MOVE '~ MOVE 10:30 - 13:00 I 2.50 MOVE MOVE 13:00 - 15:00 2.00 MOVE MOVE 15:00 - 17:30 MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE and fuel day tanks. i Set malts T/ KIC turn Off 'Set malts T/ KIC turn Off Move Rig F/ KCC T/ KIC Turn. Start Moving Malts around rig. Move Rig .8 Mile 'Move Mats around Move approximently 1/4 mile fell through road Crib Rig up and call for Trucks (sows) Try to pull out Could not pull Rig Out, Continue blocking up rig. Try to pull out Could not pull Rig Out, Continue blocking up rig. Rig Out Move Drill Module T/ Fire Training Pad, Clean Up Cribbing Remove matt at road damaged area Continue Moving Mats around to 1C access road. Fill in Damaged road with gravel and re-Matt Move Pit Module up to fire training pad. Laying Malts from Hire training pad to 1 c access road double matting. Move Sub and Pit Modules up to Y at pipeline access and C pad Move Mats around to double matt Access road over Flow lines. Continued moving mats around modules and double matting from the 1 C pad turn off to 1 C pad Moved Doyon 15 drilling module on to 1C pad Moved Doyon 15 pit module on to 1C pad Picked up mats off road and finished matting area around 1 E-28 in preparation for spotting the drilling module and Turn Sub Module and Pit Module. Moved drilling module in position over 1 C-28 Set Rear pedastal Close cellar doors, Re-Pin Wheels Walk Pit Module up on Mats Repair Hose on Hydrolic Steering Unit on Pits. Set Pits and skid rig over well, Hook Up Service All servise lines, and set Rock Washer, Hook Up Electrical lines. Berm Rig, & Rock washer, Set Cuttings tanks, Pin beaver slide, Set Parameters on Totco monitors. Rig Accepted @ 04;30. Start Nipple Up Diverter and fill Pits. Service Top Drive, Inspect Derrick, Install Mouse Hole, PJSM on Picking up 5" Drill Pipe. Loading Pipe Shed with drill Pipe. Pick Up 5" Drill Pipe and stand in Derrick total 6 joints. Iron Roughneck Down, Replaced hose on Iron Roughneck. Pick Up 5" Drill Pipe and stand in Derrick total 81 joints. Total 87jts PJSM: With day crew Diverter and Evacuation Drill. PJSM; Function test and Diverter and Evacuation drill With Night Crew. State Man -Jeff Jones Witnessed function Test, Koomey Test and Gas Alarms, Tested Totco Alarms. Post drill evaluation Good Response from Crew during Drill. Install Mouse Hole, PJSM on Picking up 5" Drill Pipe. Pick Up 5" Drill Pipe and stand in Derrick total 120 joints. Total 207 jts Pick Up 5" Drill Pipe and stand in Derrick total 63 joints. Total 270 jts Pick Up 5" HWT Drill Pipe and stand in Derrick total 20 joints and set Jars. Pick Up BHA Subs to rig floor, Fill Conductor and check surface 14:00 - 14:30 14:30 - 15:30 15:30- 18:00 18:00 - 18:15 18:15 - 19:15 9/18/2005 2.501 MOVE MOVE 0.50 i MOVE .MOVE 0.75 ~ RIGMNT RGRP 1.75 MOVE MOVE 3.50 MOVE RURD 4.50 i MOVE I RURD 8.00 MOVE RURD 1.00 ~ RIGMNTI RSRV 0.501 DRILL I PULD 0.501 DRILL I~ PULD 1.00 ; RIGMNT; RGRP 2.50 DRILL PULD 0.25 DRILL SFTY 1.00 DRILL SFTY MOVE MOVE MOVE MOVE MOVE MOVE MOVE RIGUP RIGUP RIGUP SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC 19:15 - 19:30 0.251 DRILL '; SFTY SURFAC 19:30 - 00:00 ~ 4.501 DRILL ' PULD : SURFAC 00:00 - 02:00 ~ 2.00 DRILL PULD ~~ SURFAC 02:00 - 03:30 I 1.50 DRILL PULD SURFAC 03:30 - 04:30 1.00 ~ DRILL i PULD !SURFAC Printed: 12/30/2005 9:34:03 AM ConocoPhillips Alaska _Operations Summary Report Legal Well Name: Common Well Name: Event Name: f Contractor Name: I Rig Name: I Date 9/18/2005 9!19/2005 .From-To 03:30 - 04:30 04:30 - 07:00 07:00 - 08:30 08:30 - 09:00 09:00 - 10:00 10:00 - 10:30 10:30 - 11:00 11:00 - 11:30 11:30 - 12:30 12:30 - 13:00 13:00 - 14:00 14:00 - 18:00 18:00 - 00:00 00:00 - 05:15 C-28 C-28 ZOT-D )15CM( )oyon 1 Hours 1.00 2.50 1.50 0.50 1.00 0.50 0.50 0.50 1.00 0.50 1.00 4.00 6.00 5.25 BILLING ~conocophillip: 5 Code !Code DRILL PULD RIGMNT RGRP DRILL PULD DRILL PULD DRILL ~ PULD DRILL 'PULD DRILL OTHR DRILL REAM DRILL DRLG DRILL TRIP DRILL PULD DRILL DRLG DRILL DRLG ~I DRILL DRLG ~.com Phase SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC 05:15 - 06:00 0.75 06:00 - 06:45 ; 0.75 06:45 - 07:15 0.50 07:15 - 07:45 ~ 0.50 07:45 - 09:30 1.75 09:30 - 10:00 0.50 10:00 - 12:00 , 2.00 12:00 - 14:00 DRILL ! CIRC SURFAC DRILL (TRIP SURFAC DRILL DRLG 'SURFAC DRILL ' , OTHR SURFAC DRILL DRLG SURFAC DRILL ~ OTHR SURFAC DRILL DRLG SURFAC 2.00 DRILL DRLG SURFAC Page 3 of 44 Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations equipment. Surtace Equipment Leaking @ Bell Nipple take back off silicon and re-install. Pick Up 3 Drill Collars, Hit obstuction @ 60' Rick up slick line in derrick for Gyro. Make Up BHA: Bit, Motor,Change bend To 1.5deg. MWD, Lay Down MWD Plug at 60' could not get through Make up HWDP top of Motor, Test Surface lines to 4,000psi. Clean Out conductor 60-120' Drill F/ 120' - T/ 224' to make room for BHA. Pull Out Hole. For Bha. M/U MWD, UBHO, Orientate, Flex Collars,Jars Directionally Drill and Gyro Survey: 13-1/2" From 215' - To 585' AST=1.22, ART=1.73, ADT2.95,UP WT-105k, DN WT.-105k, Rot. Wt.105k, gpm= 515 @ 1450 psi on bottom, 1300 psi off bottom, 80 rpm, Torque= 4k on bottom, 3-4k off bottom, 370' Average Rate Penetration 125' per Hr. APIG 4hrs. 92.5' per Hr. Directionally Drill and Gyro Survey: 13-1/2" From 585' -To 1,010' M.0.1,004' TVD AST-2.27, ART-.91, ADT 3.18,Total Bit Hours 6.13hrs. UP WT-115k, DN WT.-115k, Rot. Wt.110k, GPM -582-700 @ 1450-1,640 psi on bottom, 1,100 -1,520 psi off bottom, 80 rpm, Torque= 4k on bottom, 3-4k off bottom, 425' Average Rate Penetration 133' per Hr. APIG 12.5hrs. 34' per Hr. Directionally Drill and Gyro Survey: 13-1/2" From 1,010' M.D. - To 1,388' M.D.1,365' TVD AST-3.65, ART-.44, ADT 4.09,Total Bit Hours 10.22hrs. UP WT-115k, DN WT.-115k, Rot. Wt.110k, GPM -582-700 @ 1,400 psi on bottom, 1,240 psi off bottom, 80 rpm, Torque= 4k on bottom, 3-4k off bottom, Feet Drilled 378' Average Rate Penetration 92.4' per Hr. APIG 17.50 hrs. 72.45' per Hr. Note: Seen gas high 260 units. 1,180' M.D. 1,167'TVD. Circulate Hole. Rig Down Wireline Gyro Pump Out Hole T/ 1,020' and Run Back in hole While availuating surveys. Directionally Drill: 13-1/2" From 1,388' M.D. -To 1,444' M.D. Pick Up off Btm, Auger backed up and 15 gal Overflowed into secondary containment. Clean up and Unplug. Directionally Drill: 13-1/2" From 1,444' M. D. - To 1,579' M.D. Clean Suction screens on Mud Pumps.#1-#2 Directionally Drill : 13-1/2" From 1,579' M.D. -To 1,770' M.D.1,701' TVD( All Peramiters and bit hours For Depthhs 1,388' - 1,770') AST-3.47, ART-.17, ADT 3.64,Total Bit Hours 13.86hrs. UP WT-130k, DN WT.-125k, Rot. Wt.130k, GPM -615 @ 1,380 psi on bottom, 1,200 psi off bottom, 80 rpm, Torque= 4k on bottom, 3-4k off bottom, Feet Drilled 191' Average Rate Penetration 52' per Hr. Note: 376 units.1,540' M.D. Directionally Drill : 13-1/2" From 1,770' M.D.1,701' TVD - To 2,055' M.D. 1,925 TVD AST-1.16, ART-.00, ADT 1.16,Total Bit Hours 15.02hrs. UP WT-130k, DN WT.-125k, Rot. Wt.130k, GPM -615 @ 1,380 psi on bottom, 1,200 psi off bottom, 80 rpm, Torque= 4k on bottom, 3-4k off bottom, Feet Drilled 378' Average Rate Penetration 92.4' per Hr. Printed: 12/30/2005 9:34:03 AM COnocoPhtllips Alaska Page 4 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date 9/19/2005 9/20/2005 From - To Hours Code 'Code ' Phase 12:00 - 14:00 2.00 DRILL DRLG 14:00 - 14:45 0.75 DRILL CIRC 14:45 - 18:00 3.25 DRILL DRLG SURFAC Description of Operations SURFAC ,Circulate and Back Ream F/ 2,055' - T/ 1,963' To Knock down dogleg. SURFAC 18:00 - 00:00 6.00 DRILL DRLG SURFAC 00:00 - 06:00 06:00 - 12:00 6.00 6.00 DRILL I DRLG DRILL DRLG SURFAC 12:00 - 18:00 6.00 SURFAC DRILL ',DRLG 'SURFAC 18:00 - 00:00 I 6.001 DRILL '~ DRLG ;SURFAC 11deg, to 4deg.Clean Hole. Directionally Drill : 13-1/2" From 2,055' M.D.1,925' TVD - To 2,370' M.D. 2,139' TVD AST-1.13, ART-.46, ADT-1.59,Total Bit Hours 16.61 hrs. UP WT-140k, DN WT.-130k, Rot. Wt.1120k, GPM -720 @ 2,160 psi on bottom, 2,100 psi off bottom, 80 rpm, Torque= 5k on bottom, 3-4k off bottom, Feet Drilled 315' Average Rate Penetration 198' per Hr. Note units.2225' M.D. Directionally Drill : 13-1/2" From 2,370' M.D. 2,139' TVD - To 3,102' M.D. 2,436' TVD AST-1.62, ART-2.62, ADT-4.25,Total Bit Hours 20.86 hrs. UP WT-140k, DN WT.-130k, Rot. Wt.1120k, GPM -720 @ 2,160 psi on bottom, 2,100 psi off bottom, 80 rpm, Torque= 5k on bottom, 3-4k off bottom, Feet Drilled 315' Average Rate Penetration 198' per Hr. APIG 34.75 hrs. 89.2' per Hr. Note: 506 units2,950' M.D. Back Ground Gas 380units Bring M.W. Up F/9.4ppg. - T/ 9.6ppg. DRILL; 13 1/2" HOLE; F/ 3,106'MD 2,436' TVD. - T / 3,862'MD 2,721'TVD UP WT:160K, DN WT:120K, ROT WT: 135K BIT: 4.20-ADT, 1.09-AST, 3.11-ART,25.10-TOTAL BIT HOURS, 20-30 WOB, 700-GPM,-2,150. ON BTM PRESS, 2,000-OFF BTM PRESS, 80-RPM, 6-10k TORO ON BTM, 5k TORO OFF BTM, 485 MAX GAS UNITS, 340 BACKGROUND GAS UNITS. W/ 9.4 MW 9.6 MW, 210VIS, 46 YP 120 MAX GAS UNITS, 80-100 BACKGROUND W/ 9.6 MW 760' FEET DRILLED, 180' AVERAGE ROP. TOTAL; 40.75HRS, 3,742' FEET DRILLED, 91.82 APIG DRILL; 13 1/2" HOLE; F/ 3,862 'MD 2,721' TVD. - T / 4,432'MD 2,923'TVD UP WT:165K, DN WT:115K, ROT WT: 140K BIT: 3.85-ADT, 1.15-AST, 2.7-ART, 28.95-TOTAL BIT HOURS, 20-30 WOB, 750-GPM, 2,700- ON BTM PRESS, 2,700-OFF BTM PRESS, 80-100 RPM, 14k TORO ON BTM, 10k TORO OFF BTM, 150 MAX GAS UNITS, 80 BACKGROUND GAS UNITS. 9.6 MW, 210VIS, 44 YP 570' FEET DRILLED, 148' AVERAGE ROP. TOTAL; 46.75HRS, 4,312' FEET DRILLED, 92.23 APIG DRILL; 13 1/2" HOLE; F/ 4,432 'MD 2,923' TVD. - T/ 5,004'MD 3,113' TVD. UP WT:180K, DN WT:110K, ROT WT: 140K BIT: 3.85-ADT, 1.16-AST, 2.62-ART, 32.72-TOTAL BIT HOURS, 15-30 WOB, 750-GPM, 2,770- ON BTM PRESS, 2,700-OFF BTM PRESS, 80-100 RPM, 15k TORO ON BTM, 10k TORQ OFF BTM, 150 MAX GAS UNITS, 80 BACKGROUND GAS UNITS. 9.5 MW, 195 VIS, 44 YP 572' FEET DRILLED, 148' AVERAGE ROP. TOTAL; 52.75HRS, 4884' FEET DRILLED, 92.58 APIG DRILL; 13 1!2" HOLE; F/ 5,004 'MD 3,113' TVD.-T/ 5,662 'MD 3,325' Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Operations Summary Report Page 5 of 44 Legal Well Name: 1C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date 9/20/2005 From - To '~ Hours ' Code ~ Code Phase 18:00 - 00:00 6.00 DRILL ~ DRLG ~ SURFAC 9/21/2005 100:00 - 05:15 ! 5.251 DRILL ~ DRLG i SURFAC 05:15 - 06:00 ~ 0.75 06:00 - 17:00 ~ 11.00 DRILL CIRC SURFAC DRILL TRIP SURFAC 17:00 - 19:30 2.501 DRILL TRIP SURFAC 19:30 - 20:00 0.50 DRILL SFTY SURFAC 20:00 - 21:15 , 1.25 DRILL , PULD SURFAC 21:15 - 21:45 I 0.50 DRILL ; TRIP ~ SURFAC 21:45 - 23:15 1.50 DRILL TRIP SURFAC 23:15 - 00:00 ' 0.75 RIGMNTi~ RSRV I SURFAC 9/22/2005 00:00 - 01:30 1.50 DRILL TRIP SURFAC 01:30 - 02:15 0.751 DRILL CIRC SURFAC 02:15 - 06:00 3.75 ,DRILL ~ DRLG SURFAC Description of Operations TVD. UP WT:180K, DN WT:110K, ROT WT: 140K BIT: 4.75-ADT, 1.03-AST, 3.11-ART, 37.47-TOTAL BIT HOURS, 20-30 WOB, 860-GPM, 3,420- ON BTM PRESS, 3,300-OFF BTM PRESS, 80-100 RPM, 15k TORQ ON BTM, 10k TORQ OFF BTM, 128 MAX GAS UNITS, 60 BACKGROUND GAS UNITS. 9.6 MW, 210VIS,58 YP, 95deg FLOW LINE TEMP. 658' FEET DRILLED,138.5' AVERAGE ROP. TOTAL; 58.75HRS, 5,542' FEET DRILLED, 94.3 APIG DRILL; 13 1/2" HOLE; F/ 5,662'MD 3,325' TVD.- T/ 6,223'MD 3,513' TVD. UP WT:200K, DN WT:115K, ROT WT: 150K BIT: 3.71-ADT, 0-AST, 3.71-ART, 41.18-TOTAL BIT HOURS, 20-30 WOB, 900-GPM, 3,800- ON BTM PRESS, 3,720-OFF BTM PRESS, 80-100 RPM, 19-18k TORQ ON BTM, 10-15k TORQ OFF BTM, 124 MAX GAS UNITS, 69 BACKGROUND GAS UNITS. 9.6 MW, 180 VIS,48 YP, 101 deg FLOW LINE TEMP. 561' FEET DRILLED,151' AVERAGE ROP. TOTAL; 63.85HRS, 6103' FEET DRILLED, 95.5 APIG CIRCULATE; 500 BBLS PULL ONE STAND CIRCULATE A TOTAL 1 1/2 BTMS UP. Trip Out Hole; PUMP OUT HOLE F/ 6,150' - 815' UP WT.-150K, DN WT.-110K 400-GPM, 1,190PSI. FLOW CHECK WELL 10MIN AT 4,777' NOTE; #1 PUMP DOWN, (LINER AND SWAB) PUMP OUT HOLE WITH ONE PUMP, PUMP RATES TO EQUAL PULL SPEEDS. LIMITED T/50-60' PER MIN. TRIP OUT HOLE; PULL BHA, LAY DOWN UBHO,BIT CLEAR AND CLEAN RIG FLOOR. MAKE UP BIT #2, CHANGE BEND IN MOTOR FROM 1.5 TO 1.15 DEG,UD PRESS DROP SUB, DOWN LOAD MWD,CHANGE JET IN MWD FROM 8 TO 12, ORIENTATE TRIP IN HOLE WITH BHA. TRIP IN HOLE; T! 1,041' MAKE UP GHOST REAMER, CONT. TRIP IN HOLE T/ 2,821' RIG SERVICE, FILL PIPE @ 2,821' TRIP IN HOLE; F/ 2,821' - T/ 6151' FILL PIPE EVERY 25 STANDS CIRCULATE; WASH T/ 6,223' CIRCULATE BTMS UP. 120 UNITS OF GAS WHILE CIRCULATING BTMS UP. DRILL; 13 1/2" HOLE; F/ 6,223'MD 3,513' TVD. T/ 6,530' MD 3,619' TVD. UP WT:195K, DN WT:115K, ROT WT:150K BIT: 2.70-ADT, .52-AST, 2.18-ART,2.70-TOTAL BIT HOURS, 20-30 WOB, 850-GPM, 3,420- ON BTM PRESS, 3,300-OFF BTM PRESS, 100-120 RPM, 10-18k TORQ ON BTM, 10-12k TORQ OFF BTM, 225 MAX GAS UNITS, 60-100 BACKGROUND GAS UNITS. 9.8 MW, 180 VIS,52 YP, 82 deg FLOW LINE TEMP. 307' FEET DRILLED,113' AVERAGE ROP. TOTAL; 67.6 HRS, 6,410' FEET DRILLED, 94.82 APIG Note: Bringing Mud wieght up T/10ppg Printed: 12/30/2005 9:34:03 AM ConocoPhillips Alaska. Page 6 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To .Hours Code Code i Phase ',, Description of Operations 9!22/2005 ~ 06:00 - 12:00 6.00 DRILL ~ DRLG SURFAC ;DRILL; 13 1/2" HOLE; F/ 6,223'MD 3,513' TVD. T/ 6,981' MD 3,700' I TVD. UP WT:210K, DN WT:115K, ROT WT:150K I BIT: 3.18 ADT, .99-AST, 2.19-ART, 6.53-TOTAL BIT HOURS, 20-30 ~ j WOB, ~ ' 850-GPM, 3,420- ON BTM PRESS, 3,300-OFF BTM PRESS, 100-120 RPM, 10-18k TORO ON BTM, 10-12k TORQ OFF BTM, 225 MAX GAS UNITS, 160-100 BACKGROUND GAS UNITS. ! 10 MW, 160 VIS,37 YP, 92 deg FLOW LINE TEMP. 451' FEET DRILLED,141' AVERAGE ROP. TOTAL; 73.6 HRS, 6,861' FEET DRILLED, 93.2 APIG 12:00 - 18:00 ~ 6.00 DRILL DRLG SURFAC DRILL; 13 1/2" HOLE; F/ 6,981'MD 3,700' TVD. T/ 7,347 MD 3,889' I TVD. I ~ UP WT:215K, DN WT:115K, ROT WT:152K 4.53 ADT, .42-AST, 4.11-ART, 11.06-TOTAL BIT HOURS, 20-40 I WOB, I ~ 900-GPM, 3,850 - ON BTM PRESS, 3,750-OFF BTM PRESS, i 120 RPM, 10-19k TORQ ON BTM, 10-12k TORQ OFF BTM, I ill 225 MAX GAS UNITS, 120 BACKGROUND GAS UNITS. 10 MW, 170 VIS,45 YP, 95 deg FLOW LINE TEMP. ! 366' FEET DRILLED,80.79' AVERAGE ROP. TOTAL; 79.6 HRS, 7,227' FEET DRILLED, 90.79 APIG 18:00 - 19:30 1.50 !DRILL DRLG SURFAC !.DRILL; 13 1!2" HOLE; F/ 7,34TMD 3,889' TVD. T/ 7,432' MD 3,919' TVD. UP WT:215K, DN WT:115K, ROT WT:152K 1.13 ADT, 0.0-AST, 1.13-ART, 12.19-TOTAL BIT HOURS, 20-40 WOB, j 900-GPM, 3,850 - ON BTM PRESS, 3,750-OFF BTM PRESS, 120 RPM, 10-19k TORO ON BTM, 10-12k TORQ OFF BTM, ~ 269 MAX GAS UNITS, 100 BACKGROUND GAS UNITS. 10 MW, 180 VIS,52 YP, 95 deg FLOW LINE TEMP. !~ 85' FEET DRILLED,75.22' AVERAGE ROP. TOTAL; 81.3 HRS, 7,312' FEET DRILLED, 89.93 APIG 119:30 - 21:15 it 1.75 RIGMNT RGRP SURFAC #2 Pump Down Circulate and Recipacate with 1 pump @ 400 GPM 1,400psi. 21:15 - 00:00 2.75 DRILL !DRLG ;SURFAC DRILL; 13 1/2" HOLE; F/ 7,432'MD 3,919' TVD. T/ 7,598' MD 3,970' I i TVD. UP WT:215K, DN WT:115K, ROT WT:152K 3.09 ADT, .51-AST, 2.58-ART, 14.15-TOTAL BIT HOURS, 20-40 WOB, 900-GPM,3,900 - ON BTM PRESS, 3,800- OFF BTM PRESS, i i 800-GPM, 3,300 - ON BTM PRESS, 3,150-OFF BTM PRESS, 120 RPM, 10-19k TORO ON BTM, 10-12k TORO OFF BTM, I~ 225 MAX GAS UNITS, 120 BACKGROUND GAS UNITS. L 10 MW, 175 VIS,546 YP,100 deg FLOW LINE TEMP. I ';.166' FEET DRILLED,75.22' AVERAGE ROP. 'TOTAL; 84.1 HRS, 7,478' FEET DRILLED, 88.91 APIG 9!23/2005 ; 00:00 - 06:00 ~', 6.00 DRILL DRLG SURFAC 'DRILL; 13 1/2" HOLE; F/ 7,598'MD 3,970' TVD. T/ 8,050' MD 4,116' I~ ~ TVD. !, UP WT:230K, DN WT:120K, ROT WT:160K 4.51 ADT, .56-AST, 3.95-ART, 18.66-TOTAL BIT HOURS, 20-40 WOB, ! 900-GPM,3,900 - ON BTM PRESS, 3,800- OFF BTM PRESS, Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1 C-28 Page 7 of 44 Common Well Name: 1 C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours j Code bode', Phase _-_ __ . 9/23/2005 00:00 - 06:00 6.00 i DRILL ~ DRLG SURFAC 06:00 - 12:00 12:00 - 16:00 16:00 - 18:00 18:00 - 19:00 19:00 - 19:15 19:15 - 20:00 20:00 - 00:00 6.00 4.00 2.00 DRILL 'DRLG i SURFAC DRILL I DRLG ;SURFAC DRILL I TRIP I SURFAC 1.00' DRILL 0.251 DRILL 0.75':•_ DRILL 4.00'. DRILL SFTY SURFAC SFTY SURFAC TRIP SURFAC DRLG SURFAC Description of Operations 800-GPM, 3,300 - ON BTM PRESS, 3,150-OFF BTM PRESS, 120 RPM, 12-22k TORQ ON BTM, 15-18k TORO OFF BTM, 255 MAX GAS UNITS, 90 BACKGROUND GAS UNITS. 10 MW, 160 VIS,45 YP,110 deg FLOW LINE TEMP. 452' FEET DRILLED,100.22' AVERAGE ROP. TOTAL;90.1 HRS, 7,930' FEET DRILLED, 88.01' APIG MW= 10 ppg, vis=175, YP=46, FLT=100-105 deg. DRILL; 13 1/2" HOLE; F/ 8,050'MD4,116' TVD. T/ 8,376' MD4,222' TVD. UP WT:235K, DN WT:115K, ROT WT:160K 4.77 ADT,.36-AST, 3.95-ART, 23.43-TOTAL BIT HOURS, 20-40 WOB, 900-GPM,3,800 - ON BTM PRESS, 3,600- OFF BTM PRESS, 800-GPM, 3,300 - ON BTM PRESS, 3,150-OFF BTM PRESS, 120 RPM, 12-22k TORO ON BTM, 10-15k TORO OFF BTM, 255 MAX GAS UNITS, 90 BACKGROUND GAS UNITS. 10 MW, 160 VIS,45 YP,110 deg FLOW LINE TEMP. 326' FEET DRILLED,68.34' AVERAGE ROP. TOTAL;96.1 HRS, 8,256' FEET DRILLED, 87.15' APIG. MW=10 ppg, vis=155, YP=46, FLT=115 deg DRILL; 13 1/2" HOLE; F/ 8,376'MD 4,222' TVD. T/ 8,466' MD 4,253' TVD. UP WT:235K, DN WT:115K, ROT WT:160K 2.84 ADT,.19-AST, 2.65-ART, 26.27-TOTAL BIT HOURS, 20-40 WOB, 900-GPM,3,950 - ON BTM PRESS, 3,700- OFF BTM PRESS, 800-GPM, 3,400 - ON BTM PRESS, 3,300-OFF BTM PRESS, 120 RPM, 12-22k TORQ ON BTM, 10-15k TORO OFF BTM, 255 MAX GAS UNITS, 90 BACKGROUND GAS UNITS. 10 MW, 160 VIS,45 YP,110 deg FLOW LINE TEMP. 90' FEET DRILLED,31.69' AVERAGE ROP. TOTAL;100.1 HRS, 8,346' FEET DRILLED, 83.38' APIG. MW= 10 ppg, vis=160, YP=45, FLT=110 deg Short Trip: Pump Out Hole F/ 8,466' - T/ 7,290' Pump @ 400gpm #1 Pump. Had T/Change Out 2 Swabs in # 2 Pump. Circulate Hole: ConocoPhillips Safety Shut Down. PJSM Trip In Hole To 8,466' DRILL; 13 1/2" HOLE; F/ 8,466'MD 4,253' TVD. T/ 8,552' MD 4,282' TVD. UP WT:235K, DN WT:115K, ROT WT:160K 2.84 ADT,.19-AST, 2.65-ART, 26.27-TOTAL BIT HOURS, 20-50 WOB, 900-GPM,3,880 - ON BTM PRESS, 3,700- OFF BTM PRESS, 800-GPM, 3,400 - ON BTM PRESS, 3,300-OFF BTM PRESS, 120 RPM, 12-22k TORQ ON BTM, 10-15k TORO OFF BTM, 255 MAX GAS UNITS, 90 BACKGROUND GAS UNITS. 10 MW, 160 VIS,45 YP,110 deg FLOW LINE TEMP. 90' FEET DRILLED,31.69' AVERAGE ROP. TOTAL;104.1 HRS, 8,432' FEET DRILLED, 80.99' APIG. MW=10 ppg, vis=160, YP=49, FLT=110 deg 9/24/2005 00:00 - 00:30 0.501 DRILL TRIP SURFAC Trip Out Hole; Pump Out Hole F/ 8,552' - T/ 8,015 00:30 - 01:30 1.00; RIGMNT OTHR SURFAC .Circulate and Reciprocate; While Crew were Cleaning Up Rig floor. Driller was Pumping Out of hole and left pumps engaged, Roughnecks 'I broke connection Installed Mud Bucket and Driller started backing out Printed: 12/30/2005 9:34:03 AM ConocoPhillips Alaska Operations Summary Report Page 8 of 44 Legal Well Name: 1 C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date 'From - To Hours Code I Code Phase Description of Operations 9/24!2005 00:30 - 01:30 1.00 i RIGMNT~ OTHR i SURFAC with top drive. When connection was backed out enough the pressure 01:30 - 11:30 11:30 - 13:30 13:30 -15:00 15:00 - 17:00 17:00 - 20:45 20:45 - 22:45 22:45 - 00:00 9/25/2005 i 00:00 - 06:00 06:00 - 11:00 11:00- 16:30 16:30 - 16:45 16:45 - 18:45 18:45 - 19:00 10.001 DRILL (TRIP 2.001 DRILL (TRIP 1.50 ~ DRILL ! SFTY 2.00 DRILL TRIP 3.751 DRILL (TRIP 2.00 DRILL REAM 1.25 DRILL DRLG 6.00 DRILL DRLG 5.001 DRILL I DRLG SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC 5.501 DRILL CIRC; SURFAC 0.25 DRILL IOBSV SURFAC 2.00 DRILL (TRIP SURFAC 0.25;RIGMNT~RGRP SURFAC lifted the stand and mud bucket up mud was released. Approximately 3.4 bbls. all in Rig Containment as a result of release #1 pump broke right hand side drive chain on mud pump. Reported To Security @ 01:13am, approximately 6 bbls was released. After further investagation total fluid discharge was 3.4 bbls. Trip Out Hole; F/ 8,015' - 815' Pumping Out of Hole with #2 Pump, 450 GPM - 1,100psi. Pull Rates to equal Pump Rates. Monitor WeII;Work BHA UD Bit, Motor, Clear and Clean Rig Floor, Pick Up BHA #3 New Motor,Bit, Run in Hole With BHA. Trip in Hole install Ghost Reamer 1,041' Shallow Test MWD, Trip in Hole, Fill Pipe every 25 stands. 7,423' Wash and Ream F/7,423'-T/ 8,552' DRILL; 13 1/2" HOLE; F/ 8,552'MD 4,282' TVD. T/ 8,617' MD 4,304' TVD. UP WT:230K, DN WT:120K, ROT WT:160K 1.25 ADT,.O-AST, 1.25-ART, 1.25-TOTAL BIT HOURS, 10k WOB first 30', 25 WOB 700-GPM,3,250 - ON BTM PRESS, 3,100- OFF BTM PRESS, 800-GPM, 3,680 - ON BTM PRESS, 3,420-OFF BTM PRESS, 100 RPM, 12-22k TORO ON BTM, 10-15k TORO OFF BTM, 120 RPM, 12-22k TORO ON BTM, 10-15k TORO OFF BTM, 255 MAX GAS UNITS, 90 BACKGROUND GAS UNITS. 10 MW, 185VIS,60YP,80 deg FLOW LINE TEMP. 65' FEET DRILLED,52.0' AVERAGE ROP. TOTAL;105.35 HRS, 8,497' FEET DRILLED, 80.65' APIG. DRILL; 13 1/2" HOLE; F/ 8,617'MD 4,304' TVD. T/ 9,002' MD 4,434' TVD. UP WT:250K, DN WT:120K, ROT WT:165K 4.59 ADT,1.35-AST, 2.99-ART, 5.59-TOTAL BIT HOURS, 20- 25 WOB 820-GPM,4,000 - ON BTM PRESS, 3,880-OFF BTM PRESS, 120 RPM, 12-23k TORO ON BTM, 12-15k TORQ OFF BTM, 16 MAX GAS UNITS, 10 BACKGROUND GAS UNITS. 10 MW, 185VIS,60YP,80 deg FLOW LINE TEMP. 385' FEET DRILLED,83.88' AVERAGE ROP. TOTAL;111.35 HRS, 8,497' FEET DRILLED, 80.65' APIG. DRILL; 13 1/2" HOLE; F/ 9,002'MD 4,434' TVD. T/9,237' MD 4,518' TVD. TD. UP WT:245K, DN WT:120K, ROT WT:160K 4.00 ADT,1.2-AST, 2.8-ART, 9.59-TOTAL BIT HOURS, 20- 25 WOB 800-GPM, 3,850 ON BTM PRESS, 3,650-OFF BTM PRESS, 120 RPM, 10-22k TORO ON BTM, 10-15k TORO OFF BTM, 255 MAX GAS UNITS, 100 BACKGROUND GAS UNITS. 10 MW, 185 VIS, 60 YP, 80 deg FLOW LINE TEMP. 235' FEET DRILLED,58.75' AVERAGE ROP. TOTAL;116.35 HRS, 9,117' FEET DRILLED, 78.36' APIG. CIRCULATE AND CONDITION: 750 GPM @ 3,200PS1. RECIPROCATE AND ROTATE. 3x BTMS UP PULL 1 STAND EVERY 7,000STRKS. TOTAL STROKES 45,000. MONITIOR WELL PUMP OUT HOLE F/ 8,624' - 7,315', SLM OUT OF HOLE. EQUIPMENT FAILURE; WHILE PUMPING OUT HOLE STAND PIPE Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Start: 9/11/2005 Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours --_ __ -- 9/25/2005 18:45 - 19:00 0.25 9/26/2005 9/27/2005 2.50 0.25 Page 9 of 44 Spud Date: 7/30/2005 End: Group: Code Code it Phase Description of Operations 21GMNTj RGRP SURFAC III "Y" SPLIT SPRAYING 22 GALS MUD ONTO RIG FLOOR. STOP I PUMPING CLOSE IN AND CLEAN AREA. WHILE WORKING PIPE. tIGMNT~ RGRP ,SURFAC TRIP OUT HOLE; 7,315' - 4,410' MONITIORING ON TRIP TANK. RIG UP 2" HIGH PRESS LINE TO BYPASS "Y" ON STAND PIPE. 21GMNT RGRP ~ SURFAC STOP MONITIOR WELL WHILE TESTING 2" BYPASS LINE ' i 4,000PSI. PUMP SLUG. i 2.25 RIGMNT! RGRP ~ ,SURFAC TRIP OUT HOLE F/ 4,410' - 1600' ' ' " 0.75 DRILL DRLG SURFAC - T/ 815 Lay Down Ghost Reamer 1/8 Trip Out Hole F/ 1600 I , I UNDER GAUGE, 0.25 DRILL OBSV I SURFAC Monitior Well 3.00 DRILL l TRIP ~ SURFAC BHA; STAND BACK 6 STAND 5" HWT DRILL PIPE, UD 2-5" HWDP i ~ AND JARS. 3-FLEX DRILL COLLARS, MWD ,MOTOR AND BIT. 0.50 DRILL ~I SURFAC I Clean Rig Floor and Lay down tools. 1.00 CASE I RURD , SURFAC Pick Up Tam-Port Shifting Tool, Make up on single and Lay Down in j ! Pipe Shed. Make Dummy run with hanger and landing joint. 3.50 CASE i RURD ~ , SURFAC Rig Up To Run 10 3/4" casing. Had to Replace 4" valve on Conductor. 0.50 CASE ! SFTY ~ SURFAC Held PJSM on running casing with crews. 0.50 CASE i RUNC ~ SURFAC Make up 10 3/4" Shoe and Float collar and confirm Float equipment is I functional 2.00 CASE RUNC ~ SURFAC Run 10 3/4" 45.5 # I-80 BTC casing, as per-running order T/1804 1.00 CASE CIRC SURFAC ~~ Break circulation and circulate bottoms up with 400 GPM and 300 PSI / I ~ Up wt= 205K / Dn wt= 90K " ' 2.50 CASE RUNC SURFAC Run 10 3/4 45.5 # I-80 BTC casing, as per-running order T/3768 0.50 CASE j CIRC SURFAC Break circulation with 400 GPM and 420 PSI / Up wt= 230K / Dn wt= 90K 1.00 CASE ~ RUNC ~ SURFAC Run 10 3/4" 45.5 # I-80 BTC casing, as per-running order T/4573' 1.50 CASE ;CIRC ; SURFAC Break circulation and circulate bottoms up with 400 GPM and 519 PSI / j ~ Up wt= 270K / Dn wt= 90K 2.50 CASE ~ RUNC ; SURFAC Run 10 3/4" 45.5 # I-80 BTC casing, as per-running order T/6848' 0.50 CASE ~ CIRC ~ SURFAC Break cirulation and circulate 1500 strokes @ 400 GPM and 575 psi / Up wt=300K / Dn wt= 90K 1.50 CASE j RUNC I SURFAC Run 10 3/4" 45.5 # I-80 BTC casing, as per-running order T/ 7,751' 0.75 CASE j RUNC SURFAC Run 10 3/4" 45.5 # L-80 BTC casing, as per-running order f/ 7751' to ~ 8,303' Install Tam-Port Collar @ 8,219' ' 0.75 CASE I CIRC SURFAC Break cirulation @ 8303 - and circulate 1500 strokes @ 400 GPM and j ~ 575 psi ! Up wt=360K / Dn wt= 90K 1.25 CASE 'RUNC SURFAC Run 10 3/4" 45.5 # L-80 BTC casing, as per-running order f/ 8303' to ' 9,170' (232 jts total) 0.50 CASE ~ CIRC SURFAC Break cirulation and circulate 1500 strokes @ 500 GPM and 700 psi / Up wt=400K / Dn wt= 110K 1.00 CASE .RUNC SURFAC UD Fill Up Tool, Blow Down Top Drive, P/U Landing Jt Hanger, Check ~~ Break on 10' Pup, Land Hanger, Rig Up Cement Head, 04:15 - 06:00 1.75 CEMENl~CIRC SURFAC Circulate and Condition mud for cement Job. 10 3/4" shoe @ 9221'. Staging Up 3bbls-370psi. 4 bbls 460psi. 6bpm @ 340 @ 4200 strokes I Up Wt. 410k Dn Wt. 110k 19:00 - 21:30 21:30 - 21:45 21:45 - 00:00 00:00 - 00:45 00:45 - 01:00 01:00 - 04:00 04:00 - 04:30 04:30 - 05:30 05:30 - 09:00 09:00 - 09:30 09:30 - 10:00 10:00 - 12:00 13:00 - 14:00 14:00 - 16:30 16:30 - 17:00 17:00 - 18:00 18:00 - 19:30 19:30 - 22:00 22:00 - 22:30 22:30 - 00:00 00:00 - 00:45 00:45 - 01:30 01:30 - 02:45 02:45 - 03:15 03:15 - 04:15 Note; Took 560k Break Over. 06:00 - 08:00 2.00 CEMENl~CIRC SURFAC Continue to circ and condition mud and hole f! cement. Circ @ 6bpm w/ 340 psi. Recip pipe 30'. PU wt 410k, SO wt 110k, blocks 70k. Casing I started to get sticky (PU wt 550k, no down wt)(had circulated 1000 bbls.) Worked pipe free and landed 10 3/4" casing @ 0730 hrs. Continue to circ @ 6bpm w/ 340 psi. Casing depth 9221.75'. Printed: 12/30/2005 9:34:03 AM • 12:15 - 13:45 Legal Well Name: 1 C-28 Common Well Name: 1 C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours Code Code Phase 9/27/2005 i 08:00 - 12:00 ! 4.00 ~ CEMENlI PUMP ~ SURFAC 12:00 - 12:15 9/28/2005 13:45 - 15:20 15:20 - 19:45 19:45 - 20:30 20:30 - 21:30 21:30 - 21:45 21:45 - 23:45 23:45 - 00:00 00:00 - 03:00 03:00 - 04:30 04:30 - 06:00 06:00 - 12:00 12:00 - 12:30 12:30 - 13:00 ConocoPhillips Alaska Page 10 of a4 Operations Summary Report 0.251 CEMENTi DISP 1.50 CEMENl~DISP I 1.58 CEMENIiDISP 4.421 CEMENl10THR 0.751 CEMENliOTHR 1.001 CEMEN~OTHR 0.25' CEMEN OTHR 2.001 CEMENT PULD 0.25 WELCTLI NUND 3.00 WELCTL NUND 1.50; WELCT~NUND 1.50 CEMENTOTHR SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC SURFAC 6.OOICEMENliOTHR (SURFAC 0.501 CEMENl1CIRC (SURFAC 0.501 CEMENTSFTY (SURFAC 13:00 - 13:30 0,50 CEMENl~ PUMP .SURFAC 13:30 - 14:00 I 0,501 CEMEN~PULD SURFAC 14:00 - 16:00 2.OOi WELCT NUND SURFAC 16:00 - 17:30: 1.501 WELCTLI NUND I SURFAC Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations Shut down rig pump, line up on Dowell/Schlumberger @ 0800 hrs. Pump 10 bbls water @ 4bpm 110 psi. Pressure test lines to 3500 psi @ 0810 hrs. Dowell mix and pump 50 bbls CW 100 @ 5.1 bpm w/ 385 psi @ 0822 hrs. Drop bottom plug @ 0832 hrs. Pump 50 bbls mud push w/ red dye 10.5ppg @ 3.5 bpm w/ 330 psi @ 0837 hrs. Pump AS lite lead (10.7ppg)(859.1 bbls) @ 6bpm w/ 460 psi @ 0850 hrs, follow w/ tail (12.0 ppg) (229.5 bbls) @ 5.3 bpm w/ 150 psi @ 1112 hrs. Drop top plug @ 1211 hrs. Pump 20 bbls water @ 5bpm w/ 350 psi @ 1212 hrs. Rig displace @ 60 spm w/ 350 psi. At 4800 strokes divert returns to cellar box. Continue displacing w/ rig pumps @ 60 spm. At 5000 strokes pumped had good cement returns to surface. At 6000 strokes, lost returns, slowed rate to 35 spm w/ 1480 psi. At 6200 strokes lost returns when increased rate to 50 spm. At 7000 total strokes 1970 psi. At 8545 total strokes pumped, bumped plugs @ 1516 hrs. Pressure to 1900 psi, bleed off to check floats, not holding. Pressure back up to 1500 psi and hold pressure. Wait on cment f/ 4 hrs @ 1520 hrs CIP. WOC w/ 1448 psi applied pressure. Clean up rig f/ cement job. Ready diverter f/ nipple down. SICP 1448 psi. Bleed off pressure, 1 bbl bleed back, continuing to bleed back @ rate of 1/2 bph. Shut in casing. Continue wait on cement. Monitor pressure, none. Open valve @ cement head, monitor returns in 5 gallon bucket. Returns of 1/2 gallon total, then stopped. Blow down cement line. N/D cement head, lay down landing joint (left hand threads), clear floor of casing tools. N/D diverter riser. Flush riser and annular f/ cement contamination. N/D flowline, 8' of flowline was 3/4 full of cement. UD riser and remove f/ cellar. Flush annular, work bag to remove cement f/annular. N/D annular and diverter spool. MU 3 jts of 1" cs hydril 2.25 ppf L-80 (1.315" OD w/ 1.6" connection OD) to run along side of 10-3/4" FMC hanger and landing ring on 16" conductor. Try to fit, will not fit between the space of the Hutted hanger and landing ring. Run 20' of 1/2" cold roll down along side of Outs to depth of 17'. Lay down the hydril CS 1"tubing. MU 3!4" x 10' conduit threaded, attempt several times, to go past collar below hanger, no go. Lay down 3/4" pipe. Had warehouse to deliver 3/4" x 20' sticks of pipe. Weld pipe together and washed down to depth of 30' below hanger (70 1/2' RKB). Flush annulus between 16" conductor and 10-3/4" surface casing to 30' below hanger w/ water. Hold PJSM w/ Dowell cementers and rig crew prior to top job cementing of annulus of 16" & 10-3l4" surface casing. Dowell pump .5 bbls water, pump 4.8 bbls of AS lite cement @ 10.7-10.8 ppg @ 1 bpm w/ 60 psi. Rig down Dowell cementers. Rig down 3/4" pipe used f/ top job. Install FMC Gen 5 casing and tubing head. Orient according to Valve and handwheel orientation drawing SK-1C20/28. Dated 07/2005 Install double studded adapter 11" 5M x 13-5/8" 5m, install riser, install spacer spool. PU BOP stack and set weight on FMC wellhead. Test metal to metal seal to 1000 psi, OK. hold f/ 10min. Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Page 11 of a4 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date 9/28/2005 9/29/2005 From - To 16:00 - 17:30 17:30 - 00:00 00:00 - 01:30 01:30 - 04:30 Hours Code ('.Code Phase -._ __ 1.501 WELCTL~ NUND ~ SURFAC Ii i 6.50 WELCT~ NUND SURFAC I 1.501 WELCT OTHR SURFAC 3.001 WELCTL OTHR I SURFAC 04:30 - 06:00 I 1.50 I WELCTLI BOPE i SURFAC 06:00 - 12:00 i 6.00 12:00 - 14:00 i 2.00 RIGMI 160PE SURFAC RGRPISURFAC 14:00 - 16:00 ; 2.00 WELC 16:00 - 16:30 0.50 WELC ' 16:30 - 17:00 0.50 WELC 17:00 - 17:30 0.50 WELC 17:30 - 18:00 j 0.50 WELC , 18:00 - 19:30 1.50 WELC 19:30 - 21:00 1.50 ~ RIGMI 21:00 - 22:30 I 1.50 RIGMI - 22:30 - 22:45 ~ 0.25 DRILL 22:45 - 00:00 1.25 DRILL 9/30/2005 00:00 - 00:15 ; 0.25 DRILL 00:15 - 01:00 0.75 ~ DRILL 01:00 - 01:30 0.50 DRILL i 01:30 - 03:30 ! 2.00 DRILL I BOPE ~ SURFAC BOPE SURFAC BOPE SURFAC BOPE ~' SURFAC OTHR SURFAC OTHR SURFAC RSRV SURFAC RSRV SURFAC 'SFTY SURFAC PULD SURFAC ,PULD %SURFAC OTHR SURFAC PULD ,SURFAC ;PULD (SURFAC 03:30 - 04:30 ~ 1.00' DRILL ~ OTHR ~ SURFAC 04:30 - 06:00 1.50 DRILL r PULD I SURFAC 06:00 - 06:15 , + 0.25 DRILL ~ OTHR ', SURFAC 06:15 - 12:00 5.75 DRILL i PULD I SURFAC Description of Operations Note: Rig floor to casing spool LD screws 38.70'. Rig floor to tbg head LD screws 36.50'. Continue NU 13 5/8" ROPE. Nipple up choke line, kill line, flow nipple, connect turnbuckles. Hammer up flanges. Rig up floor. Change bales to drilling bales. PU 4" floor valves, x-o's, test plug and wear bushing. RU to test. MU 4" test joint and x-o's. Lay down test joint. MU 5" test joint and head pin. MU test plug, RIH, RU test hoses. fill stack and choke manifold w/ water. Test BOPE, witness of test by AOGCC inspector Lou Grimaldi. Test annular to 250 psi low and 3500 psi high w/ 5" dp. Test upper rams (4-1/2" x 7" variables), outer kill HCR valve and inner manual valve on choke side to 250 psi low and 4200 psi high. Note: 4200 psi is 80% burst of 10 3/4" casing. Continue testing 13 5/8" 5m BOPE. Test 250 psi low and 4200 psi high all componets except hydril, high test on hydril 3500 psi. Testing against upper pipe rams, manual kil valve; HCR choke valve, choke manifold valves 16,17, 18, and 5" dart valve. Test choke manifold valves 12,13,14,15, and TIW valve. Test choke manifold valves 5,6,10, & 11 w/ 4" dart valve. Test choke manifold valves 1,4,7 & 4" TIW valve. Test choke valves 2,3,8, & 9, Test lower pipe rams (3-1/2" x 6" variables) w/ 4" DP. Work on Koomy unit. Checked pre charge, charged 2 bottles f/ 925 psi to 1000 psi, change manifold pressure guage, adjust air pump pressure sensor f/ cut in & out pressure. Test Hydril 250 psi low, 3500 psi high w/ 4"joint of pipe Test blind rams to 250 psi low and 4200 psi high. Test upper (BOP valve on top drive drive to 250 psi low and 4200 psi high. Test lower (BOP valve on top drive to 250 psi low and 4200 psi high. Rig down testing tools and equipment. Set FMC long slotted wear bushing. 10" ID, 10-7/8" OD. R/D test joint. Slip and cut 154' drilling line. Service top drive. Grease crown and drawworks. Pre job safety meeting on PUlMU BHA #4 (9-7/8") PU Geo pilot, MU 9.18' geo flex, MU bit. Note: Held H2s drill w/ personal accounted for in truck shop. Continue PU BHA # 4 (9-7/8" geo pilot). PU/MU smart stabilizer, MWD, TM HOC. Upload Sperry Sun MWD tools. PU/MU/RIH w/ Sperry Sun 6 3/4" flex collars. Change elevators. PU/MU/RIH w/ Weatherford 4" XT-39 HWDP & rabbit w/ 2-3/8" rabbit. Torque to 22,200 ft/Ib. PU Weatherford Daily drilling jars and Weatherford Daily accelerator jars. Test Sperry Sun geo pilot skid to 4000 psi. Shallow test MWD tools 626', ok. Blow down lines. PU wt 90k, SO wt 90k. PU/MU/RIH w/ Weatherford 4", HT38 dp, rabbit with 2-3/8" rabbit. Torque to 17,700 ft/Ib Rotate 20 rpm & pump 20 psi w/ 100 psi f/ 1002-1034'. Tam port collar 1002' Continue PU/MU/RIH w/ Weatherford 4", HT38 dp, rabbit with 2-3/8" rabbit. Torque to 17,700 fUlb. PU total of 111 jts 4" HT38. Depth is 4140'. PU wt 130k, SO wt 100k Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Operations Summary Report Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: Date ___ 9/30/2005 10/1 /2005 10/2/2005 From --.To 12:00 - 16:00 16:00 - 17:00 17:00 - 18:00 18:00 - 19:00 19:00 - 20:45 20:45 - 21:30 21:30 - 23:00 23:00 - 00:00 00:00 - 02:00 02:00 - 02:30 02:30 - 02:45 02:45 - 03:45 03:45 - 04:15 04:15 - 05:45 05:45 - 06:00 06:00 - 06:30 06:30 - 07:00 07:00 - 07:30 07:30 - 08:00 08:00 - 08:15 08:15 - 10:45 10:45 - 11:00 11:00 - 12:45 12:45 - 13:30 13:30 - 14:00 14:00 - 14:30 14:30 - 15:45 15:45 - 16:00 16:00 - 17:00 17:00 - 17:15 1 C-28 1 C-28 ROT -DRILLING D15CM@conocophillips.com Doyon 15 ~i Hours ; Code ' Code ~ Phase ~'~I 4.00 j DRILL PULD SURFAC 1.00 DRILL 1.00 DRILL 1.00 (DRILL 1.75 DRILL 0.75 CASE 1.50 CASE 1.00 ~! DRILL DRILL OTHR ;SURFAC TRIP .SURFAC REAM SURFAC CIRC (SURFAC DEQT ;SURFAC DEQT j SURFAC DRLG SURFAC DRLG SURFAC 0.50 DRILL 0.25 DRILL 1.00 i DRILL 0.50 ~ DRILL 1.501 DRILL 0.251 DRILL 0.50! DRILL 0.50 DRILL 0.50 DRILL 0.50 DRILL 0.251 DRILL 2.50 i DRILL 0.25 DRILL 1.75 DRILL 0.75 DRILL 0.50 DRILL 0.50; DRILL 1.251 DRILL 0.25 i DRILL 1.00 DRILL 0.25 DRILL CIRC SURFAC DRLG SURFAC CIRC SURFAC DRLG SURFAC CIRC ~I SURFAC LOT SURFAC LOT SURFAC i OTHR ~ SURFAC OTHR ~ INTRMI TRIP INTRM1 CIRC INTRM1 TRIP INTRM1 OTHR IINTRM1 TRIP INTRM1 TRIP INTRM1 OTHR INTRM1 PULD INTRMI PULD INTRM1 OTHR ~ INTRM1 OTHR 'INTRMI PULD INTRM1 17:15 - 18:00 I 0.751 DRILL TRIP INTRMI 18:00 - 19:15 1.25 j DRILL TRIP INTRM1 19:15 - 22:30 3.25 ~ DRILL ~ ~ TRIP ~ INTRM1 22:30 - 00:00 ~ 1.50 RIGMNT ', RSRV INTRM1 00:00 - 00:45 ~ 0.75 RIGMNT~ RSRV INTRM1 00:45 - 01:15 ' , 0.50, DRILL REAM INTRM1 01:15 - 06:00 4.75 I DRILL I DRLG INTRM1 Start: 9/11 /2005 Rig Release: 11/17/2005 Rig Number: 15 Page 12 of 44 Spud Date: 7/30/2005 End: Group: Description of Operations Change elevators, PU 90 joints Weatherford 5" 4/12" IF drill pipe & rabbit w/ 2 7/8" rabbit. Torque to 28,000 ft/Ibs. RIH f/ 4140' to 6994'. Fill drill pipe. Pulse test MWD. No pulse. Blow down top drive. Run 5" Dp from derrick, first stand is stand #68 on tally. Started taking weight @ 8802' (stand 86/87). MU top drive onto stand 86. Wash f/ 8202' to 9130'. Tag top of cement @ 9130'. Note:Top of float collar @ 9135.5'. Circ and condition mud prior to casing test. Stand back a stand. Blow down top drive. RU to test 10-3/4" casing. Flush air f/ mud lines/kill line. Test casing to 2500 psi f/ 30 min. Chart test. Rig down testing equipment. Drilling cement, wiper plugs f/ 9130' to 9132'. PU 260k, SO wt 105k, rot wt155k Drilling wiper plugs, @ 9132' , FC @ 9135', green cement to 9217'. PU 260k, SO wt 105k, rot wt 155k Circ out thick cement contaminated mud @ 9217'. Drill FS @ 9219', then cement in 13-1/2" OH (rat hole) to 9237'. Circ out thick cement contaminated mud @ 9237'. Drill 9-7/8" hole f/ 9237' to 9257' (4524'TVD) ART = .5 hrs, WOB 20k, 120 RPM, 17-19 ft/Ib torque, 590 gpm w/ 3300 psi. Circ and condition mud f/ LOT @ 9257'. MW to 9.5 ppg. PU wt 260k, SO wt 105k, Rot wt 160k. Monitor well, PU into shoe. RU to perform LOT. Blow down top drive. RU/Perform LOT w/ 9.5 ppg MW csg shoe @ 9222' MD/4513' TVD, OH @ 9257' MD/ 4524' TVD. EMW 13.4 ppg using conservative 920 psi. R/D equipment f/ LOT. Move 5" HWDP f/ driller's side to OFF-Driller's die of derrick. POOH f/ Sperry Sun MWD (no pulse), Pull 10 stands 5" dp f/ 9200' to 8231'., monitor hole fill, monitor well @ 8231'. Pump dry job @ 8231'. POOH 5" DP f/ 8231' to 4172' Change elevators f/ 5" to 4" Continue POOH 4" DP and BHA f/ 4172' to 625'. Stand back HWDP and flex collars. Download MWD. UD RLL, smart stab, Gamma/Res/ PWD. PU/MU BHA. New RLL, smart stab, GAM/RESlPWD. Upload MWD. Shallow pulse test. Check geopilot. RIH w/ BHA # 5 (9-7/8" w/ geopilot), UD top 5" HWDP joint above accelerators. Continue RIH w/ 4" dp f/ 412' to 1583'. Continue RIH w/ 4" dp f/ 1583' to 4140'. Fill pipe @ 2973'. Change elevators f/ 4" to 5". MU crossover, RIH f/ 2973' to 9154'. Fill pipe @ 4397', 6775' and 9154'. Service top drive. Change out saver sub. Service top drive. Change out saver sub. MU stand, MU top drive, fill pipe, Wash f/ 9154' to 9257'. Pump 600 gpm w/ 3450 psi. 120 rpm, 17-19k ft/Ib torque. Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 9257' to 9308' (4542' TVD) (5i'} ART 2.53 hrs w/ Sperry Sun geo pilot, 25k WOB, 120-150 rpm's, 600-640 gpm, 9.5 ppg mw, on bottom pressure 3300 Printed: 12/30/2005 9:34:03 AM ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1C-28 Page 13 of 44 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date 'From - To `Hours Code C d II, Phase ~' Description of Operations 10/2/2005 i 01:15 - 06:00 06:00 - 07:15 o e. 4.75 DRILL DRLG INTRM1 1.25 DRILL DRLG .INTRMI 07:15 - 07:45 0.50 DRILL OTHR INTRM1 07:45 - 12:00 4.25 j DRILL DRLG INTRM1 12:00 - 16:30 4.50 DRILL DRLG INTRM1 16:30 - 17:00 17:00 - 17:30 17:30 - 18:00 18:00 - 20:15 20:15 - 21:45 21:45 - 22:00 22:00 - 23:15 23:15 - 00:00 10/3/2005 00:00 - 01:30 01:30 - 02:30 0.50 ' DRILL OTHR INTRM1 0.50 DRILL TRIP INTRMI 0.50 DRILL CIRC INTRMI 2.25 DRILL TRIP INTRMI 1.50 DRILL TRIP INTRM1 0.25 DRILL TRIP ~ INTRMI 1.25 ~ DRILL i~ TRIP !,INTRMI i 0.75 ~ DRILL i~ ~ OTHR ~ INTRM1 1.50 DRILL I OTHR INTRM1 1.001 DRILL I PULD I INTRM1 02:30 - 03:15 1 0.751 DRILL ~ OTHR ; INTRM1 03:15 - 03:30 0.25! , DRILL ' DEOT ~ INTRMI 03:30 - 04:45 1.251 1 DRILL I ~ TRIP ' INTRM1 04:45 - 06:00 I 1.25 DRILL TRIP INTRMI 06:00 - 09:30 3.50 DRILL TRIP ~ INTRM1 09:30 - 10:00 0.501 DRILL ', REAM ~I INTRM1 psi, off bottom pressure 3250 psi, on bottom torque 17k ft/Ib, off bottom torque 16k ft/Ib, PU wt 260k, SO wt 90k, Rot wt 160k. Note: Pumped 25 bbl pill- 20 ppb medium nut plug and .5 ppb SAPP @ 9295' to try to unball bit. Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f! 9308' to 9342' (4555' TVD) (34') ART 1.25 hrs w/ Sperry Sun geo pilot, 25k WOB, 140 rpm's, 640 gpm, 9.5 ppg mw, on bottom pressure 3500 psi, off bottom pressure 3400 psi, on bottom torque 17k fUlb, off bottom torque 16k ft/Ib, PU wt 245k, SO wt 100k, Rot wt 155k. Perform PWD baseline test @ 9342' w/ 9.5 ppg mud. Clean hole @ 630 gpm/150 rpm is 10 ppg EMW. Clean hole @ 600 gpm/120 rpm is 10 Pp9 EMW. Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 9342' to 9520' I (4615' TVD) (178') ART 3.72 hrs w/ Sperry Sun geo pilot, 25k WOB, 1140 rpm's, 640 gpm, 9.5 ppg mw, on bottom pressure 3500 psi, off bottom pressure 3400 psi, on bottom torque 17k ft/Ib, off bottom torque 16k fUlb, PU wt 245k, SO wt 100k, Rot wt 155k. Note: Pumped 20 bbl pill- 19 ppb Med nut plug @ 9448'. Directional drill 9-7l8" hole w/ Sperry Sun geo pilot f/ 9308' to 9520' (4652' TVD) (102') ART 2.13 hrs w/ Sperry Sun geo pilot, 25k WOB, 140 rpm's, 640 gpm, 9.5 ppg mw, on bottom pressure 3500 psi, off bottom pressure 3400 psi, on bottom torque 14-18k fUlb, off bottom torque 15k ft/Ib, PU wt 245k, SO wt 115k, Rot wt 160k. Note: Pump 20 bbl pil- 19 ppb medium nut plug @ 9553'. Note: Total hours on bit 9.63 hrs, total footage 365'. Average ROP equals 37.9 ft/hr. Pump out of hole w/ 600 gpm & 3000 psi f/ 9622' to 9154'. POOH f/ 9154' to 8583'. Pump dry job. 25 bbls @ 11.3 ppg. Blow down top drive. Continue to POOH f/ 8583' to 4111'. Change slips and elevators to 4". Continue to POOH f/ 4111' to 1050'. UD Ghost reamer. Check guage. Full guage 9-7/8". 'Continue POOH w/ 4" dp f/ 1040' to MWD @ 62'. UD first 2 joints of HWDP in pipe shed. Stand back 4" HWDP, accelerators, jars and flex I collars. Download Sperry Sun MWD. Download Sperry Sun MWD.PuII guts f/ HOC, UD MWD, UD geo pilot, Break bit, change jets in another bit. PU/MU new Sperry Sun geoPilot, MU different 9-7/8" bit (steel body w/ ~ (6) 18/32" jets)., change pulsar in HOC to handle higher flow rates up to 1750 gpm. ~~ Upload MWD. ~~ MU top drive. Shallow test MWD. Good test. Blow down top drive. MU flex collars, change elevators to 4", Trip in hole w/ 4" HWDP and jars and accelerators, MU 9 -7/8" ghost reamer on top of 4" HWDP to 609'. PU wt 93k, SO wt 92k, block wt 70k Trip in hole w/ Weatherford 4" HT38 drill pipe f/ 609' to 2976', fill pipe. Continue trip w/ Weatherford 4" DP in hole f/ 2976', change elevators I and run 5" starting @ 4115'. Fill pipe @ 5351' and 9157'. Record up and down weights every 10 stands. MU top drive and ream f/ 9221' (csg shoe) to TD @ 9622'. Ream w/ 120 Printed: 12/30/2005 9:34:03 AM ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1 C-28 Event Name: ROT -DRILLING Start: 9/11/2005 Contractor Name: D15CM@conocophillips.com .Rig Release: 11/17/2005 Rig Name: Doyon 15 Rig Number: 15 Date 10/3/2005 From - To j Hours , ..Code 09:30 - 10:00 0.50 DRILL 10:00 - 10:30 0.50 ~ DRILL 10:30 - 12:00 12:00 - 12:30 12:30 - 13:00 13:00 - 15:30 15:30 - 16:00 16:00 - 16:30 16:30 - 17:00 I 117:00 - 18:00 18:00 - 00:00 10/4/2005 00:00 - 06:00 06:00 - 09:30 09:45 - 10:00 10:00 - 10:45 1,10:45-12:00 12:00 - 12:15 12:15 - 12:30 12:30 - 18:00 18:00 - 00:00 ~, i 10/5/2005 00:00 - 01:30 1.50' RIGMNT 0.50 DRILL 0.50; RIGMNT 2.50 i RIGMNT 0.50 RIGMNT 0.50 DRILL i 0.50 RIGMNT 1.00 RIGMNT 6.00 RIGMNT I I 6.00 RIGMNT 3.50 RIGMNT I 0.25' RIGMNT 0.75 RIGMNT 1.25 RIGMNT 0.25; DRILL 0.25 DRILL 5.50 DRILL 'Sub Code REAM DRLG (RGRP ;DRLG RGRP RGRP RGRP DRLG RGRP SFTY RGRP RGRP RGRP RGRP RGRP RGRP TRIP REAM DRLG 6.001 DRILL DRLG 1.50! DRILL !DRLG Page 14 of 44 Spud Date: 7/30/2005 End: Group: Phase Description of Operations -. _. INTRM1 rpm, 650 gpm w/ 3950 psi. Torque 13-14k fU Ib. INTRM1 (Directional dri{I 9-7l8" hole w/ Sperry Sun geo pilot (/ 9622' to 9643' (4659' TVD) (21') ART .27 hrs w/ Sperry Sun geo pilot, 20k WOB, 150 rpm's, 660 gpm, 9.5 ppg mw, on bottom pressure 3860 psi, off bottom pressure 3850 psi, on bottom torque 16k fUlb, off bottom torque 13k ft/Ib, PU wt 210k, SO wt 130k, Rot wt 158k. INTRMI ~ Change liner gasket on # 2 mud pump. INTRM1 ;Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 9643' to 9663' ~ (4667' TVD) (20') ART .31 hrs w/ Sperry Sun geo pilot, 20k WOB, 150 rpm's, 660 gpm, 9.5 ppg mw, on bottom pressure 3860 psi, off bottom pressure 3850 psi, on bottom torque 16k ft/Ib, off bottom torque 13k ft/Ib, PU wt 210k, SO wt 130k, Rot wt 158k. INTRM1 POOH f/ 9663' to 9157' (inside casing shoe) to work on mud pumps. INTRMI ~ Change liner gaskets on # 1 and # 2 mud pump. INTRMI ~ RIH f/ 9157' to 9663'. INTRM1 Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 9663' to 9724' (4691' TVD) (61') ART .35 hrs w/ Sperry Sun geo pilot, 20k WOB, 150 rpm's, 660 gpm, 9.5 ppg mw, on bottom pressure 3860 psi, off bottom pressure 3850 psi, on bottom torque 16k fUlb, off bottom torque 13k ft/Ib, PU wt 210k, SO wt 130k, Rot wt 158k. INTRMI .Kelly hose hung up on 3" cement line @ gooseneck of 3" cement line, Iwhile going up to make a connection. POOH to 9143'. (10-3i4" Shoe @ 9222'). INTRM1 PJSM on rigging down kelly hose f/ derrick and top drive. INTRMI Rig down kelly hose, lower hose to ground. Remove clamps and i hammer unions in shop. Prepare ends f/ new kelly hose. New kelly hose manufactured by Copper State, 3-1/16" ID, 83' long. INTRM1 Prepare ends to attatch to new kelly hose. New kelly hose manufactured by Copper State, 3-1116" ID, 83' long. Clean and scrub wind walls, circ top of hole. Hole static. INTRMI MU new kelly hose to upper gooseneck of standpipe and then to top drive. Secure safety lines on both ends. INTRM1 Circ through mud line and fill kelly hose. Test hose to 5000 spi. INTRMI Test hose to 5000 psi. Stage pressure up slowly. INTRM1 Run new hose up and down derrick, pressure hose to 3800-3900 spi, work up & down, downlink to see movement of hose in derrick. Inconclusive as to how old hose contacted 3" cementing line. Adjust .safety clamp on top drive to hose. INTRM1 RIH f/ 9143' to 9631' INTRMI Wash f/ 9631' to 9724'. INTRM1 Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 9724' to 10092' (4824' TVD) (368') ART 3.65 hrs w/ Sperry Sun geo pilot, 10-20k WOB, ~ 120-150 rpm's, 660-615 gpm, 9.5 ppg mw, on bottom pressure 3860-3750 psi, off bottom pressure 3850-3650 psi, on bottom torque 14-18k ft/Ib, off bottom torque 13k ft/Ib, PU wt 210-220k, SO wt 130k, Rot wt 158-162k. INTRM1 Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 10092' to 10413' (4941' TVD) (321') ART 3.65 hrs w/ Sperry Sun geo pilot, 10-20k WOB, 120-150 rpm's, 660-615 gpm, 9.5 ppg mw, on bottom pressure 3860-3750 psi, off bottom pressure 3850-3650 psi, on bottom torque ':14-18k ft/Ib, off bottom torque 13k ftllb, PU wt 210-220k, SO wt 130k, Rot wt 158-162k. INTRM1 Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 10413' to 10537' Printed: 12/30!2005 9:34:03 AM r1 ~~ ConocoPhillips Alaska Page 15 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date .From- To '' Hours Code ', Sub Phase Code _- _ ~_ ~- - 10/5/2005 ~ 00:00 - 01:30 ~ 1.50 DRILL DRLG INTRM1 01:30 - 02:00 0.50 02:00 - 03:30 1.50 03:30 - 04:15 0.75 04:15 - 04:30 0.25 04:30 - 06:00 1.50 06:00 - 06:45 j 0.75 06:45 - 11:00 ' 4.25 11:00 - 13:30 2.50 13:30 - 14:15 0.75 14:15 - 15:00 0.75 15:00 - 15:30 0.50 15:30 - 17:00 ~ 1.50 10/6/2005 17:00 - 17:45 17:45 - 18:00 18:00 - 19:00 19:00 - 19:45 19:45 - 23:45 23:45 - 00:00 00:00 - 01:30 01:30 - 03:00 03:00 - 03:30 03:30 - 06:30 0.75 0.25 1.00 0.75 4.00 0.25 1.50 1.50 0.50 3.00 06:30 - 07:00 ~ 0.50 07:00 - 08:30 ' 1.50 08:30 - 09:15 0.75 09:15 - 09:45 0.50 09:45 - 10:15 0.50 10:15 - 12:00 ! 1.75 ',12:00-15:00 3.00 DRILL CIRC IINTRMI DRILL REAM INTRM1 DRILL (TRIP INTRM1 DRILL OTHR INTRM1 DRILL CIRC INTRM1 DRILL CIRC IINTRMI DRILL TRIP ;INTRMI DRILL ,TRIP jINTRM1 DRILL OTHR INTRMI DRILL PULD INTRM1 DRILL PULD INTRM1 DRILL PULD INTRM1 DRILL OTHR INTRM1 DRILL ;TRIP i INTRM1 DRILL : TRIP INTRM1 DRILL ( TRIP INTRM1 DRILL (TRIP IINTRMI DRILL IOTHR IINTRMI DRILL I DRLG !INTRMI DRILL !DRLG INTRM1 DRILL j SFTY INTRMI DRILL (TRIP INTRM1 DRILL (CIRC IINTRMI RIGMNT RSRV INTRM1 RIGMNTI RSRV j INTRM1 DRILL (TRIP INTRM1 DRILL REAM INTRM1 DRILL I DRLG I INTRM1 DRILL I DRLG IINTRMI Description of Operations (4991' TVD) (124') ART .9 hrs w/ Sperry Sun geo pilot, 10-20k WOB, 1.120 rpm's, 626 gpm, 9.5 ppg mw, on bottom pressure 3720 psi, off '~, bottom pressure 3650 psi, on bottom torque 15k ft/Ib, off bottom torque 11 k ft/Ib, PU wt 200k, SO wt 140k, Rot wt 167k. SPR's, circ 10 min, monitor well. Static. Backream f/ 10537' to 9820' bit depth (ghost reamer to shoe). Rotate 150 rpm, pump 650 gpm w/ 3950 psi. Torque 11-12k POOH wt f/ 9820' to 9157'. No problems. Monitor well. Static, blow down fillup line. ;Circ 2xBU @ 9157'. 650 gpm w/ 3850 psi. 130 rpm, 11 k ft/Ib torque. !Circ total 1658 bbls. PU wt 180k, SO wt 135k. ~: Monitor well. Pump dry job, blow down top drive. POOH f/ rotary stearable failure. Stand back 4" HWDP, lay down 1 joint 4" HWDP and accelerators, continue working BHA, break bit. Download MWD. UD MWD and Geopilot. Clear rig floor of tools. I BHA #7. PU 7600 Geopilot (ser # 103), filled reference housing w/ ;grease, cleaned connections on Geopilot flex and smart blade stab, MU I, bit (SEC FSF 2653 w/ (3) 18's & (3) 16's). 'Sperry Sun upload MWD. Continue MU BHA #7, install 6-3/4" flex collars. RIH w/ flex collars, 1 stand 5" HWDP. Shallow test MWD. RIH w/ 5" HWDP f/ derrick, PU jars and accelerators. Bit depth/BHA 792'. RIH w/ Weatherford 5" dp f/ 792' to 9165'. Ran 88 stands 5" f/ derrick, filling pipe every 25 stands. Change elevators f/ 5" to 4". Prepare to move 37 stands Weatherford 4" HT 38 DP f/ driller's side of derrick to off driller's side. Move 37 stands Weatherford 4" HT 38 DP f/ driller's side of derrick to off driller's side. Change elevators f/ 4" to 5". POOH f/ 9165' to 6121'. Pulled 32 stands. Clear floor. PJSM on PU 5" dp. PU/rabbit w/ 2.88" drift--RIH w/ 5" dp f/ pipe shed. Fill pipe @8499', RIH to 9165'. PU wt 210k, SO wt 128k Note: Picked up 96 joints (32 stands) of Weatherford 5" dp. Circ dp volume plus (200 bbls) @ 700 gpm w/ 3460 psi. Check MWD pulse, OK. ,Slip and cut drilling line. ~; Service top drive. ;Continue in hole f/ 9160' to 10402'. ', Wash and ream f/ 10402' to 10537. No fill, no problems. 120 rpm, 646 ~i gpm w/3300 psi Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 10537'-10782' (5104' TVD) (245') ART 1.28 hrs w/ Sperry Sun geo pilot, 15-20k WOB, 120 rpm's, 575 gpm, 9.5 ppg mw, on bottom pressure 2590 psi, off bottom pressure 2400 psi, on bottom torque 18k ft/lb, off bottom torque 17k ft/Ib, PU wt 230k, SO wt 140k, Rot wt 172k. ECD 10.87ppg ~' Note: Pumped bit ball sweep (20 ppb nut plug med, 3% screenKleen, 1 ;ppb SAPP) @ 10592'. Directional drill 9-7/8" hole w! Sperry Sun geo pilot f/ 10782'-11065' (5257 TVD) (283') ART 1.81 hrs w/ Sperry Sun geo pilot, 15-20k WOB, Printed: 12/30/2005 9:34:03 AM ~ i ConocoPhillips Alaska Page 16 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common W ell Name: 1 C-28 Spud Date: 7/30/2005 Event Nam e: ROT -D RILLING Start: 9/11/2005 End: Contractor Name: D15CM @conoco phillip s.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 1 5 Rig Number: 15 Date Fram - To Hours '~ Code Phase ' Description of Operations Code 10/6/2005 ; 12:00 - 15:00 ~ 3.00 DRILL DRLG INTRM1 120 rpm's, 550 gpm, 9.5 ppg mw, on bottom pressure 2490 psi, off ~ ; bottom pressure 2350 psi, on bottom torque 18-21 k fUlb, off bottom ~ torque 20k ft/Ib, PU wt 240k, SO wt 145k, Rot wt 175k. ECD 10.83 ppg 15:00 - 16:45 1.75 DRILL CIRC ; INTRM1 Circ 700 gpm w/ 3480 psi and recip w/ rotating @ 120 rpm. Pump 42 1' bbls sweep. 16:45 - 17:30 0.75 4 DRILL TRIP INTRM1 Monitor well, POOH slowly f/ 11065' to 10450'. , 17:30 - 17:45 i 0.25 i DRILL CIRC INTRMI Pump dry job. j 17:45 - 19:00 ~ 19:00 - 19:15 1.25 0.25 DRILL DRILL ! TRIP OTHR INTRM1 ~ INTRMI ~ Continue POOH f/ 10450' to 9165' Monitor well @ shoe. Blow down top drive. 19:15 - 21:00 1.75 DRILL . TRIP INTRM1 Continue POOH f/ 9165' to 4598'. 21:00 - 22:30 1.50 DRILL PULD ~ INTRM1 PU 40 Weatherford 5" LoTads to rig floor to make up while POOH. 22:30 - 00:00 1.50 DRILL TRIP ~! INTRM1 Continue POOH installing LoTads one per stand on stands 5" dp. 12 made up @ 2359 hrs 10/7/2005 00:00 - 03:30 i 3.50 j DRILL TRIP INTRM1 Continue POOH f/ 3456' to 792' installing LoTads one per stand on stands 5" dp. Total of 40 LoTads have been installed on dp in derrick. 03:30 - 03:45 I 0.25 DRILL OTHR INTRM1 ~ Clear rig floor. 03:45 - 05:00 ~ 1.25 DRILL ': PULD INTRMI I PU 5" HWDP, rabbit to 2.883, RIH f/ 792' to 1173'. 05:00 - 06:00 1.00 DRILL ' TRIP INTRMI POOH w/ 5" HWDP f/ 1173' to 417'. 06:00 - 07:00 1.00 DRILL TRIP INTRM1 Handle BHA # 7. UD Accelerators, hyd jars, stand flex collars in derrick. 07:00 - 07:45 0.751 DRILL OTHR INTRM1 Download Sperry Sun MWD. 07:45 - 09:00 1.25 DRILL PULD INTRM1 Work BHA # 7. Break 9-7/8" Sec FSF 2653 bit, UD Sperry Sun MWD and 7600 Geo pilot, ser No. 103. 09:00 - 09:30 ; 0.50 DRILL OTHR INTRMI ; Clear rig floor. .09:30 - 10:45 1.25 DRILL ,PULD INTRMI Work BHA # 8. PU 7" Sperry Sun motor, MU Hughes HCM 605 bit w/ ~ 7-16/32" nozzles(TFA 1.374), adjust bend on motor to 1.22 deg. 10:45 - 11:30 0.75 DRILL ' OTHR INTRM1 Upload Sperry Sun MWD. 11:30 - 12:00 0.50 ~ DRILL PULD ~ INTRM1 Continue handling BHA # 8, flex collars and one stand of 5" HWDP. 12:00 - 12:15 0.251 DRILL OTHR INTRM1 Flow test MWD @ 555 gpm w/ 1000 psi. 12:15 - 12:30 0.25 DRILL PULD INTRM1 Continue PU BHA # 8. PU/MU Weatherford Daity6- 1/4" jars, one stand 5" Weatherford HWDP and 6 1/4" accelerators to 41 T. Blow down top it 12:30 - 16:00 ~ 3.50 I DRILL . TRIP j INTRM1 drive. RIH w/ Weatherford 5" DP f/ 41T to 6 stands and a single 5" dp (1023'), I install Weatherford 9.875" ghost reamer, continue RIH w/ 59 stands total in hole Weatherford 5" dp to bit depth of 6036'. Fill pipe every 25 j stands. 16:00 - 18:30 2.50 j DRILL TRIP INTRM1 Start adding 5" Weatherford LoTads to pipe run in hole. Add IoTads to ~ ~ 25 stands f/ 6036' to 9195'. 18:30 - 19:15 I 0.75 DRILL CIRC INTRM1 , Fill pipe. Spot 60 bbls, 6.5% Steel tube EP pill in casing. Circ 200 bbls. 19:15 - 21:15 ~~ 2.00 DRILL i OTHR lNTRM1 Install roller guide fl mud bucket hanging line. Move clamp on Kelly hose. 21:15 - 22:15 1.00 ~ DRILL TRIP ' INTRM1 Continue trip in hole f/ 9195' to 10984'. 22:15 - 22:30 0.25; DRILL REAM ! INTRM1 ~ Precautionary wash and ream f/ 10984' to 11065'. 22:30 - 22:45 0.25 j DRILL DRLG INTRM1; Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 11065'-11080' (5263' TVD) (15') ART 0.0 hrs AST .15 hrs., 15-20k I, ~ WOB, 120 rpm's, 550 gpm, 9.5 ppg mw, on bottom pressure 2490 psi, j ~, off bottom pressure 2350 psi, on bottom torque 18-21 k ft/Ib, off bottom ' torque 20k fUlb, PU wt 240k, SO wt 145k, Rot wt 175k. ECD 10.83 ppg ~ 22:45 - 23:30 0.75 DRILL CIRC INTRM1 Circ the EP mud tube pill out of hole prior to connection. 23:30 - 00:00 0.50 ~ DRILL DRLG ' INTRM1 I Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ ~i ', 11080'-11115' (5282' TVD) (35') ART 0.0 hrs AST .15 hrs., 15-20k WOB, 120 rpm's, 550 gpm, 9.5 ppg mw, on bottom pressure 2490 psi, ~ I j off bottom pressure 2350 psi, on bottom torque 18-21 k fUlb, off bottom Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Page 17 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1 C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date .From - To Hours Code Code Phase Description of Operations 10/7/2005 23:30 - 00:00 0.50 10/8/2005 00:00 - 06:00 06:00 - 12:00 6.00 DRILL DRLG INTRM1 DRILL DRLG INTRM1 DRILL ':DRLG : INTRM1 12:00 - 18:00 I 6.001 DRILL I DRLG I INTRM1 18:00 - 00:00 6.00 10/9/2005 00:00 - 06:00 i 6.00 06:00 - 07:00 1.00 07:00 - 08:30 1.50 08:30 - 08:45 08:45 - 12:00 DRILL DRLG INTRM1 DRILL !DRLG INTRM1 DRILL DRLG ~ INTRMI DRILL I CIRC i INTRMI 0.25! DRILL 'TRIP jINTRM1 3.25 i DRILL i DRLG ~ INTRM1 torque 20k ft/Ib, PU wt 240k, SO wt 145k, Rot wt 175k. ECD 10.83 ppg Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 11115'-11618' (5484' TVD) (503') ART 1.96 hrs AST 1.86 hrs., Total hrs on bit = 4.33 hrs, Total hrs on jars = 157.61 hrs,15-29k WOB, 120 rpm's, 650 gpm, 9.6-9.8 ppg mw, on bottom pressure 3500-3580 psi., off bottom pressure 3300-3400 psi, on bottom torque 14-18k fUlb, off bottom torque 16-18k fUlb, PU wt 240k, SO wt 152k, Rot wt 188k. ECD 10.83-11.0 ppg Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 11618'- 11994' (5597' TVD) (376') ART 3.1 hrs AST 1.27 hrs., Total hrs on bit = 7.98 hrs, Total hrs on jars = 161.26 hrs, 15-30k WOB, 120 rpm's, 698-680 gpm, 9.7 ppg mw, on bottom pressure 3580-3860 psi, off bottom pressure 3400-3750 psi, on bottom torque 16-14k ft/Ib, off bottom torque 16-13k ft/Ib, PU wt 240-245k, SO wt 152-150k, Rot wt 188-186k. ECD 11.0-11.55 ppg Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 11994'- 12464' (5737' TVD) (470') ART 3.36 hrs AST .40 hrs., Total hrs on bit = 11.74 hrs., Total hrs on jars = 165.02 hrs, 15-30k WOB, 120 rpm's, 680-660 gpm, 9.7-9.8 ppg mw, on bottom pressure 3860-3980 psi, off bottom pressure 3750-3640 psi, on bottom torque 14-18k ft/Ib, off bottom torque 13-14k ft/Ib, PU wt 245-250k, SO wt 150-154k, Rot wt 186-188k. ECD 11.0-11.46 ppg Note: Pumped 40 bbl weighted sweep 11.9 ppg/300 vis @ 12269'. Control drill 12269' @ 150'/hr f/ ECD's. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 12464'- 12822' (5846' TVD) (358') ART 1.79 hrs AST 1.48 hrs., Total hrs on bit = 15.01 hrs., Total hrs on jars = 168.29 hrs, 15-25k WOB, 120 rpm's, 680-650 gpm, 9.8 ppg mw, on bottom pressure 3920-4125 psi, off bottom pressure 3720-4026 psi, on bottom torque 15-17k ft/Ib, off bottom torque 13-15k ft/Ib, PU wt 245-250k, SO wt 150-154k, Rot wt 186-192k. ECD 11.41-11.3 ppg Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 122 deg bend f! 12822'- 13050' (5915' TVD) (228') ART 2.19 hrs AST 1.25 hrs., Total hrs on bit = 18.45 hrs., Total hrs on jars = 171.73 hrs, 14-16k WOB, 120 rpm's, 650-675 gpm, 9.8 ppg mw, on bottom pressure 3830-4100 psi, off bottom pressure 3745-3980 psi, on bottom torque 15-17k ft/Ib, off bottom torque 14-15k fUlb, PU wt 245k, SO wt 155-160k, Rot wt 186-195k. ECD 11.3-11.02 ppg Note: Pumped 20 bbls 120 vis 10.4 ppg sweep @ 12991'. Pumped 15 bbl lubtex tube pill f/ sliding @ 12,998'. Pump 50 bbl 185 vis sweep @ 13040'. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 122 deg bend f/ 13050'- 13131' (5939' TVD) (81') ART .8 hrs AST 0.0 hrs., Total hrs on bit = 19.25 hrs., Total hrs on jars = 172.53 hrs, 14-16k WOB, 120 rpm's, 664 gpm, 9.85 ppg mw, on bottom pressure 4100 psi, off bottom pressure 3745psi, on bottom torque 16-17k fUlb, off bottom torque 15k fUlb, PU wt 245k, SO wt 160k, Rot wt 195k. ECD 11.02 ppg Circ sweep to surface. POOH 1 stand, continue to circ w/ working pipe f/ 13035' to 12940'. Circ @ 185 spm 664 gpm w/ 3700 psi. Rotate 120 rpm. RIH f/ 12940' to 13131', make connection. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 13131'- 13351' (6002' TVD) (220') ART 1.43 hrs AST .85 hrs., Total hrs Printed: 12/30!2005 9:34:03 AM ConocoPhillips Alaska Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 10/9/2005 1 C-28 1 C-28 ROT -DRILLING D15CM@conocophillips.com Doyon 15 'From - To Hours ' Code ' Sub I Code - _ - 08:45 - 12:00 ~ 3.25 ~ DRILL ~ DRLG 12:00 - 13:30 1.501, DRILL ;DRLG 13:30 - 14:00 ~ 0.50 14:00 - 14:45 0.75 14:45 - 18:00 3.25 i 18:00 - 22:00 4.00 22:00 - 00:00 2.00 10/10/2005. 00:00 - 00:30 ' 0.50 00:30 - 02:00 1.50 02:00 - 06:00 i 4.00 06:00 - 06:30 0.50 06:30 - 07:30 I 1.00 07:30 - 10:30 ~ 3.00 10:30 - 12:00 1.50 12:00-13:45 1.75 13:45 - 16:00 !, 2.25 16:00 - 18:00 I 2.00 Phas iNTRM1 INTRM1 RIGMNT RGRP INTRMI RIGMNT RGRP INTRMI DRILL DRLG ; INTRM1 I DRILL i DRLG I INTRM1 DRILL ~ CIRC INTRM1 I DRILL TRIP INTRMI DRILL !DRLG INTRM1 DRILL WIPR ; INTRM1 DRILL '~ OTHR INTRMI RIGMNT RSRV INTRM1 RIGMNT RGRP INTRM1 DRILL ; WIPR INTRM1 DRILL ~ WIPR ~ INTRMI DRILL REAM ~, INTRMI DRILL I DRLG I INTRMI Page 18 of 44 Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11!17/2005 Group: Rig Number: 15 e Description of Operations on bit = 21.53 hrs., Total hrs on jars = 174.81 hrs, 6-15k WOB, 120 rpm's, 660 gpm, 9.9-10.1 ppg mw, on bottom pressure 4000-3800 psi, off bottom pressure 3740-3480 psi, on bottom torque 17-18k ft/Ib, off bottom torque 13-15k ft/Ib, PU wt 250k, SO wt 160k, Rot wt 195-192k. ECD 11.02-11.2 ppg Directional drill 9-718" hole w/ SperrydriN 7/8-6.0 mfr w/ 1.22 deg bend fi 13351'- 13415' (6021' TVD) (64') ART .31 hrs AST .31 hrs., Total hrs on bit = 22.15 hrs., Total hrs on jars = 175.43 hrs, 10 k WOB, 120 rpm's, 668 gpm, 10.2 ppg mw, on bottom pressure 3840 psi, off bottom !,pressure 3740 psi, on bottom torque 16k ft/Ib, off bottom torque 15k ' ftllb, PU wt 250k, SO wt 160k, Rot wt 192k. ECD 11.44 ppg Service blocks and top drive. Work on #2 mud pump. Repair # 2 mud pump. Replaced liner gasket. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mfr w/ 1.22 deg bend f/ '~ 13415'- 13587' (6071' TVD) (172') ART 1.19 hrs AST .75 hrs., Total hrs on bit = 24.09 hrs., Total hrs on jars = 177.37hrs, 8-15 k WOB, 120 rpm's, 654 gpm, 10.2 ppg mw, on bottom pressure 3860 psi, off bottom pressure 3720 psi, on bottom torque 16k ft/Ib, off bottom torque 15k ft/Ib, PU wt 250k, SO wt 160k, Rot wt 192k. ECD 11.39 ppg Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mfr w/ 1.22 deg bend f/ 13587'- 13798' (6143' TVD) (211') ART 1.69 hrs AST 1.11 hrs., Total hrs on bit = 26.89 hrs., Total hrs on jars = 180.17 hrs, 8-17 k WOB, 120 rpm's, 650 gpm, 10.2 ppg mw, on bottom pressure 3860-4000 psi, off bottom pressure 3720-3820 psi, on bottom torque 16k ft/Ib, off bottom torque 15k ft/Ib, PU wt 250k, SO wt 160k, Rot wt 200 k. ECD 11.39 ppg Note: pumped mutplug, lubetex sweep f/ sliding @ 13,638'. Pumped 50 bbl 12.2 ppg, 200 vis sweep @ 13,735' (before HRZ). 'Circ @ 658 gpm w/ 3850 psi, circ sweep out of hole, circ foal of 2 x BU while rotating @ 120 rpm w/ 14k torque. Stand back a stand per hour f/ 13798' to 13514'. Circ total of 28,500 strokes (2437 bbls). After circulating hole clean, RIH in hole f/ 13514' to bottom @ 13798'. No problems. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mfr w/ 1.22 deg bend f/ 13798'- 13909' (6177' TVD) (111') ART .91 hrs AST 0.0 hrs., Total hrs on bit = 27.8 hrs., Total hrs on jars = 181.08 hrs, 8-17 k WOB, 120 rpm's, 188.5 motor rpm, 655 gpm, 10.2 ppg mw, on bottom pressure 4047 psi, off bottom pressure 3900 psi, on bottom torque 17k ft/Ib, off bottom torque 15k ftllb, PU wt 250k, SO wt 160k, Rot wt 195 k. ECD 11.39 ppg Short trip to 10-3/4" casing shoe. POOH wet f/ 13909' to 9203'. Pulled ''good, no problems. Clean rig floor after wet trip. Service rig and top drive. Replace liner wear plate middle cylinder, #2 mud pump. Run pump & verify proper working order. Trip in hole f/ 9203' to 11171', fill pipe every 25 stands. Continue trip in hole f/ 11171' to 13800', fill pipe every 25 stands. Precautionary wash and ream f/ 13,800' to 13,890' w! 530 gpm & 3300 gpm (ECD 11.9 ppg). Circ and condition mud and hole, work up to 600 !gpm w/ ECD 11.58 ppg. BG gas 20-40 units, max gas 80 units Directional drill 9-7i8" hole w/ Sperrydrill 7/8-6.0 mfr wl 1.22 deg bend f! ;13909'- 14047 (6223' TVD) (138') ART .99 hrs AST .64 hrs., Total hrs Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Page 19 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common W ell Name: 1 C-28 Spud Date: 7/30/2005 Event Nam e: ROT -D RILLING Start: 9/11/2005 End: Contractor Name: D15CM @conoco phillip s.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 1 5 Rig Number: 15 Date From - To ~, Hours ', Code ~~, Sub ~i Code Phase __ Description of Operations _ __ __ - 10/10/2005 16:00 - 18:00 ~ 2.00; DRILL DRLG INTRMI ~ on bit = 29.43 hrs., Total hrs on jars = 182.71 hrs, 8-17 k WOB, 120 rpm's, 174 motor rpm, 600 gpm, 10.2 ppg mw, on bottom pressure ~ 3600 psi, off bottom pressure 3450 psi, on bottom torque 15-16k fUlb, off bottom torque 14k ft/Ib, PU wt 250k, SO wt 160k, Rot wt 190 k. ECD 11.37 ppg BG gas 15 units, max gas 68 units i 18:00 - 00:00 6.00 DRILL DRLG INTRM1 Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 14047'- 14463' (6356' ND) (416') ART 4.58 hrs AST 0.0 hrs., Total hrs on bit = 34.01 hrs., Total hrs on jars = 187.29 hrs, 10-15 k WOB, 120 rpm's, 174-188 motor rpm, 600-650 gpm, 10.2 ppg mw, on bottom pressure 3600-3960 psi, off bottom pressure 3450-3750 psi, on bottom ~ l torque 15-18k ftllb, off bottom torque 14-15k fUlb, PU wt 252-255k, SO i wt 160-165k, Rot wt 192-202 k. ECD 11.37-11.4 ppg BG gas 10-25 units, max gas 62 units 10/11/2005 00:00 - 00:30 ' 0.50 1 RIGMNTi RGRP ; INTRM1 i , Work pipe &circ w/ #2 pump @ 94 spm/ 1400 psi while change out ~ valve and seat in # 1 mud pump # 3 cylinder. Rotate 90 rpm w/ 16k 00:30 - 01:30 ~ 1.00 it DRILL DRLG ~ i INTRMI i torque. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 14463'- 14529' (6373' ND) (66') ART .21 hrs AST .49 hrs., Total hrs i on bit = 34.71 hrs., Total hrs on jars = 187.99 hrs, 10-15 k WOB, 120 rpm's, 174-188 motor rpm, 600-650 gpm, 10.2 ppg mw, on bottom pressure 3600-3960 psi, off bottom pressure 3450-3750 psi, on bottom torque 15-18k fUlb, off bottom torque 14-15k fUlb, PU wt 252-255k, SO wt 160-165k, Rot wt 192-202 k. ECD 11.37-11.4 ppg BG gas 10-25 units, max gas 65 units 01:30 - 03:00 1.50 RIGMNT RGRP INTRM1 Back ream f/ 14529' to 14463', set back stand. Work pipe f/ 14463' to ~ 14371' &circ w/ #1 pump @ 94 spm/ 1400 psi while change out liner ~ gasket in # 2 mud pump # 1 cylinder. Rotate 90 rpm w/ 16k torque. ' Make connection . 03:00 - 06:00 3.00 DRILL DRLG ! INTRMII Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ x; 14529'- 14735' (6432' ND) (206') ART 1.52 hrs AST .54 hrs., Total hrs I ! on bit = 36.77 hrs., Total hrs on jars = 190.05 hrs, 10-12 k WOB, 120 ~ ' rpm's, 186 motor rpm, 640 gpm, 10.2 ppg mw, on bottom pressure i 3970 psi, off bottom pressure 3810 psi, on bottom torque 15-18k fUlb, off bottom torque 14-15k ft/Ib, PU wt 255k, SO wt 170k, Rot wt 205 k. ECD 11.37-11.4 ppg BG gas 25-35 units, max 83 units 06:00 - 12:00 ~ ~ DRILL DRLG INTRM1 Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 14735'- 14935' (6469' ND) (200') ART 2.37 hrs AST 1.4 hrs., Total hrs on bit = 40.54 hrs., Total hrs on jars = 193.82 hrs, 10-15 k WOB, 120 rpm's, 174-183 motor rpm, 600-632 gpm, 10.2 ppg mw, on bottom pressure 3950-3980 psi, off bottom pressure 3620-3720 psi, on bottom ~, torque 15-19k ft/Ib, off bottom torque 15-13k fUlb, PU wt 260-265k, SO '~, wt 162-170k, Rot wt 205-198 k. ECD 11.37-11.28 ppg I '~ ~ ! BG gas 30 units, max gas 84 units 12:00 - 18:00 6.00 DRILL DRLG INTRMI i Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 14935'- 15068' (6489' ND) (133') ART .49 hrs AST 2.1 hrs., Total hrs j on bit = 43.13 hrs., Total hrs on jars = 196.41 hrs, 8-15 k WOB, 120 i ~ rpm's, 180-183 motor rpm, 620-632 gpm, 10.2 ppg mw, on bottom pressure 3980-3850 psi, off bottom pressure 3720-3690 psi, on bottom 'I i torque 17-19k ft/Ib, off bottom torque 13-17k ft/Ib, PU wt 265k, SO wt ~ I I ~ 162k, Rot wt 198 k. ECD 11.28-11.14 ppg 'I , I I BG gas 30 units, max gas 73 units Printed: 12/30/2005 9:34:03 AM r 1 -__.~ ConocoPhillips Alaska Page 20 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date 10/11 /2005 ...From - To ~! Hours Code ~ Sub I Phase Description of Operations 'Code 18:00 - 21:30 ' 3.501, DRILL DRLG INTRM1 Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ I ~ ..15068'- 15202' (6514' TVD) (134') ART .38 hrs AST 1.46 hrs., Total hrs 21:30 - 23:45 2.25 23:45 - 00:00 0.25 10/12/2005 00:00 - 06:00 ! 6.00 06:00 - 15:30 ~ 9.50 15:30 - 17:00 ~ 1.50 1 17:00 - 18:45 1 1.75 , 18:45 - 22:30 3.75 22:30 - 00:00 1.50 10/13/2005 00:00 - 00:45 0.75 00:45 - 01:15 ' 0.50 01:15 - 03:30 2.25 03:30 - 06:00 ; 2.50 06:00 - 07:00 1.00 07:00 - 07:45 ! 0.75 07:45 - 08:30 I 0.75 on bit =44.97 hrs., Total hrs on jars = 198.25 hrs, 8-10 k WOB, 120 rpm's, 181 motor rpm, 625 gpm, 10.2 ppg mw, on bottom pressure 3750 psi, off bottom pressure 3650 psi, on bottom torque 15-20k ft/Ib, off bottom torque 15-18k ft11b, PU wt 260k, SO wt 167k, Rot wt 209 k. ECD 11.2-11.3 ppg BG gas 30 units, max gas 76 units DRILL CIRC INTRMI Circ and condition hole. Pump 45 bbls sweep weighted to 12.2 ppg 150 1 vis. Circ sweep to surface. Circ 18000 strokes (1539 bbls). DRILL REAM ' INTRM1 Continue circulating w/ Backreaming w/ 120 rpm, torque 20k ft/Ib, 175-180 spm (646 gpm w/ 3600 psi )f/ 15130'-15100'. DRILL REAM 'INTRMI 'Continue circulating w/ Backreaming w/ 120 rpm, torque 20-17k ft/Ib, 175-180 spm (646 gpm w/ 3600 psi) f/ 15100' to13800'. Pulling 8-12 ;ft/min. Pulling 1 stand every 20-25 min. ECD 11.4-11.23 ppg. DRILL REAM ~ INTRM1 Monitor well, OK. Continue backreaming w/ 120 rpm, torque 17- 19k ftllb, 175-180 spm (646 gpm w/ 3600-3100 psi) f/ 13800'-9188' .Pulling 30-40 ft/min. Pulling 1 stand every 3-4 min then circ 2-3 min prior to break off stand. Avg 5-6 stands per hour pulled. ECD 11.4-11.23 ppg. DRILL CIRC INTRM1 ;Circ and reciprocate f/ 9198 to 9100', w/ rotating @ 120 rpm. Circ two bottoms up inside casing. Circ @ 650 gpm (motor rpm 188) w/ 3000 psi. Torque 9k ft/Ib. ECD 11.17 ppg. RIGMNT RSRV ? INTRM1 Slip & cut 102 ft of 1-3/8" drilling line. DRILL , TRIP INTRM1 POOH w/ BHA #8 f/ 9198' to 41 T. Record PU & SO weights. DRILL TRIP ! INTRM1 ' UD accelerators and jars, stand back flex collars, break bit. Download MW D/LW D. DRILL ; OTHR ' INTRM1 Download Sperry Sun MWD. DRILL PULD INTRM1 UD Sperry sun MWD and Sperry drill motor. WELCTL OTHR INTRM1 Drain stack. Pull FMC Wear bushing. RU to test BOPE. WELCTL BOPE ' INTRMI ' Weekly BOP test. Test Annular, choke manifold valves 16,17 and 18 and HCR on kill line to 250 psi low, then 3500 psi high. Hood each test 5 ' . min. Test top pipe rams (variables 4-1/2" x7"), choke manifold valves 16,17,18 and HCR kill line to 250 psi low, then 4200 psi high. Hold each ' ~ test 5 min. Testing against top pipe rams and choke manifold valves i 12,13,14,15, 9, floor safety valve, HCR kill line to 250 psi low, then 4200 psi high, hold each test 5 min. Test top pipe rams and choke 1 valves 5,6,10,11, floor inside BOP and manual kill to 250 psi low, then 4200 psi, hold each test 5 min. Test top pipe, choke valves 1,4,7 and manual kill to 250 psi low, then 4200 high, hold each test 5 min. Test ~ manual kill and upper top drive valve. to top pipe choke valves 2 3 8 ~ 1 , , , , 250 psi low, then 4200 high, hold each test 5 min. Test top pipe rams, lower manula top drive valve, HCR choke line and manual kill line to 250 psi low, then 4200 psi high, hold each test 5 min. WELCT BOPE ; INTRM1 Continue weekly BOP test. Test top pipe rams w/manual choke valve ~ to 250 psi low, then 4200 psi high, hold f! 5 min each test. Test bottom i I~, pipe rams (3-1/2" x 6" variables) to 250 psi low then 4200 psi high, hold each test for 5 min. Test accumulator, pressure after closing 1500 psi, 200 psi build in 28 seconds, full charge attained in 3 min 34 seconds. Nitrogen backup is 5 bottles w/ 2400 psi avg. WELCTL~~ BOPE ' INTRM1 ' Pull test joint. RU to test blind rams. Test blind rams, choke valves ; 2,3,5,8, and manual kill valve to 250 psi low, then 4200 psi high, hold 'each test 5 min. WELCTL, OTHR INTRM1 ~ R/D test equipment, Install FMC wear bushing. Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Page 21 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common W ell Name: 1 C-28 Spud Date: 7/30/2005 Event Nam e: ROT -D RILLING Start: 9/11/2005 End: Contractor Name: D15CM @conoco phillip s.com Rig. Release: 11/17/2005 Group: Rig Name: Doyon 1 5 Rig Number: 15 Date From - To Hours ~ Code ', Code Phase Description of Operations -- 1 10/13/2005 08:30 - 09:30 ~ ~ 1.00 W ELCTL ' OTHR ~ _ __' INTRMI ~ _ _ -- __ _ _ - Blow down kill and choke lines and top drive. 1 09:30 - 10:30 ~ 1.00 CEMENT OTHR j INTRM1 PU 3-1/2" handling tools f/ picking up 3-1/2" 9.3 ppf, L-80, EUE tubing ' for plug back. ~~ 10:30 - 12:30 2.00 CEMENT TRIP INTRM1 PU/MU 3-1/2" EUE mule shoe, 33 jts 3-1/2" 9.3 ppf L-80 EUE tubing, 3-1/2" EUE pin x 3-1/2" IF box crossover, 3-1/2" IF pin x 4-1/2" IF box crossover for total length of 1035.34'. ! Change elevators to 5". R/D tubing tongs. 12:30 - 16:30 4.00 ~ CEMEN TRIP INTRM1 ~ Trip in hole w/ 5" dp f/derrick f/ 1035' to 9215'. Record PU & SO wts every 10 stands. 16:30 - 18:00 1.50 CEMENT; CIRC INTRM1 ~ Circulate bottoms up @ 10-3/4" shoe. Circ @ 330 gpm w/ 750 psi, circ I~ i ~ total of 697 bbls. Blow down top drive. PU wt 172k, SO wt 130k, block j 18:00 - 21:45 3.75 CEMEN TRIP ' ~ INTRM1 wt 70k. Continue RIH w/ 3-1/2" cementing stinger on 5" 21:45 - 22:00 0.25 CEMEN CIRC INTRMI Make top drive connection, wash down w/ 3 bpm 525-550 psi, tag ~ bottom @ 15202'. SO wt w/o rot while circ 160k, PU wt w/o rot while circ 250k. Rotate 40 rpm w/ 14k ft/Ib torque, PU wt 200k. 22:00 - 00:00 2.00 i CEMEN CIRC INTRM1 Circulate staging pumps up f/ 3 bpm to final 8.72 bpm w/ 1150 psi. ! Rotate @ 40 rpm w/ 14k torque. Reciprocate 30' stroke. 10/14/2005 ~ 00:00 - 01:30 ; 1.50 CEMENT CIRC INTRM1 ' Circulate @ 8.72 bpm w/ 1150 psi. Rotate @ 40 rpm w/ 14k torque. I Reciprocate 30' stroke. ' PJSM w/dowel) and rig crew while circulating. Circ total of 1668 bbls. Break off and stand back stand # 147, PU single f/ pipe shed. PU wt 250k, SO wt 160k. 01:30 - 02:00 0.501 CEMEN PUMP INTRM1 RU head pin, Dowell pump 5 bbls water, test lines to 3000 psi, pump additional 15 bbls water f/ total of 20 bbls water ahead, mix and pump I 57.6 bbls 15.8 ppg class "G" w/ additives @ 5.2 bpm, initial pressure ~ 640 psi, final pressure 128 psi, pump 2 bbls water in string, turn over to ~ ; rig f/ displacment. 02:00 - 02:45 0.75 CEMEN DISP i INTRM1 'Rig Displace cement @ 7.26 bpm w/ initial pressure of 630 psi, final ~ i pressure of 1040 psi. Pump 252 bbls mud to balance cement in string I and open hole. Top of cement w/ dp in hole 14570'. ' ' 02:45 - 04:15 1.50, CEMEN TRIP INTRM1 UD single, POOH slow (9 ft/min) f/ 15171 to 14218 . Top of cement with dp out of cement is 14591' 04:15 - 04:30 0.25. CEMEN CIRC INTRM1 MU top drive, circulate @ 650 gpm w/ 2850 psi. Circ 316 bbls. Rotate 1 1 @ 40 rpm w/ 14k torque. Recip f/ 14218'-14124'. 1 04:30 - 05:00 0.50 ~I CEMENT CIRC INTRMI Stop pumps, break off top drive, drop Baker wiper, circ wiper down @ 1 ~, 640 gpm w/ 2650 psi follow w/ 252.8 bbls mud. Rotate 40 rpm w/ 14k 05:00 - 05:15. ~'' 0.25 1 CEMEN I TRIP ~ ' INTRM1 ' torque. Recip f/ 14218' to 14124'. POOH f! 14218' to 13930'. 05:15 - 05:45 0.50 ~ CEMEN CIRC ~'; INTRMI Spot 20 bbl Hi Vis pill @ 13930' to 13689' w! pipe in hole. (after pulling out --will be f/ 13930' to 13719'.) Chase pill w/ 2800 strokes. Pump @ 550 psi w/ 2150 psi. 05:45 - 06:00 0.25 ~ CEMEN j TRIP INTRM1 POOH f/ 13930' to 13740'. PU wt 245k, SO wt 160k i 06:00 - 07:00 ; 1.00 CEMENT PUMP INTRM1 RU head pin, dowel) pump 5 bbls water, test lines to 3000 psi, pump an additional 15 bbls water f/ total of 20 bbls water ahead, mix and pump i ! 58 bbls 15.8 class "G" w/ additives @ 4.7 bpm, initial pressure 425 psi, ~ ; final pressure 50 psi, pump 2 bbls water in string, turn over to rig f/ !,displacement. 07:00 - 07:30 0.50 ; CEMEN DISP ! INTRM1 ~ Rig Displace cement @ 7.26 bpm w! initial pressure of 640 psi, final pressure of 1100 psi. Pump 226bb1s mud to balance cement in string and open hole. Top of cement w/ dp in hole 13108'. "07:30 - 08:30 ~ 1.00 CEMENT TRIP INTRM1 POOH slowly f/ 13740' to 13170'. (9 ft/min pulling speed). Top of ', i ! cement with dp out is 13129', should circ 40' (3.3 bbls of cement f/ hole) Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Page 22 of 44 Qperations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1 C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date 10/14/2005 10/15/2005 'From - To I Hours Code 'Code Phase ' Description of Operations 07:30 - 08:30 1.00 _ I - _~ -- - __ - _ _-_ _ - 08:30 - 10:45 2.25 CEMENt TRIP ~ INTRM1 f/ top of cement @ 13170'. l~CIRC INTRM1 Circ @ 13170' recip pipe f/ 13170' to 13075'. Pump 35 bbl biozan sweep) follow w/ 970 bbls mud @ 650 gpm w/ 2950 psi, then slow rate 1 to 3-4 bpm, final of 1225 bbls pumped. Rotate @ 40 rpm w/ 12-18k ft Ib. 10:45 - 12:00 I 1.25 12:00 - 12:30 ! 0.50 12:30 - 14:00 1.50 14:00 - 17:00 3.00 17:00 - 19:30 , 2.50 19:30 - 20:30 1.00 20:30 - 20:45 0.25 20:45 - 22:00 I 1.25 22:00 - 23:00 1.00 23:00 - 23:30 0.50 23:30 - 00:00. 0.50 00:00 - 00:15 ; 0.25 00:15 - 01:30 ~ 1.25 CIRC IINTRM1 CIRC ~ INTRM1 TRIP ' INTRM1 TRIP f INTRM1 CEMENT PULD ~ INTRMI CEMENI ~RURD INTRM1 DRILL ~ SFTY INTRMI DRILL PULD INTRM1 DRILL OTHR ' INTRM1 DRILL PULD INTRM1 DRILL TRIP INTRM1 DRILL OTHR INTRMI DRILL TRIP IINTRM1 01:30 - 01:45 ! 0.25 - DRILL ';CIRC I INTRM1 01:45 - 02:30 0.75 DRILL TRIP INTRM1 02:30 - 02:45 0.25 ~ DRILL CIRC INTRM1 02:45 - 03:15 ! 0.50 ~ DRILL ' SFTY ' INTRM1 03:15 - 04:30 1.25 DRILL TRIP ' INTRM1 04:30 - 05:45 1.25 . DRILL CIRC INTRMI 1 05:45 - 06:00 0.25 DRILL STRIP INTRM1 06:00 - 06:30 I 0.50. DRILL TRIP INTRMI 06:30 - 07:45 1.25 ~ DRILL ;CIRC ,. INTRMI 07:45 - 10:30 2.751 DRILL CIRC INTRM1 10:30 - 11:00 ~ 0.50 DRILL OTHR I INTRM1 11:00 - 12:30. 1.50 i DRILL !DRLG ~ INTRMI 12:30 - 18:00 I 5.501 DRILL 'i DRLG I INTRM1 Stop, break off top drive, drop Baker wiper plug, circ 525 gpm w/ 2080 psi, rotate @ 40 rpm w/ 12-14k ft Ib torque. Rotating PU wt 190k, rotating SO wt 170k. Torque 12-14k. Pump dry job, blow down top drive. POOH w/ cementing stinger (1035' of 3-1/2" 9.3ppf L-80 EUE tubing) f/ 13170' to 9220' (csg shoe), Record PU 8~ SO wt's every 5 stands in open hole. POOH w/ cementing stinger (1035' of 3-1/2" 9.3ppf L-80 EUE tubing) f/ 9220' to 1035', Record PU & SO wt's every 10 stands in casing. PJSM, RU to UD 3-1/2" tubing, lay down (2) x-o's, 33 jts 3-1/2" 9.3 ppf L-80 EUE tubing, and mule shoe stinger. R/D tubing pulling equipment, Clean rig floor. PJSM on PU/MU BHA #10 (9-7/8" Hughes HCM 605 bit w/ 7" SperryDrill 7/8- 6 stage motor w/ 1.22 deg bend) PU/MU BHA #10 (9-7/8" Hughes HCM 605 bit w! 7" SperryDrill 718- 6 stage motor w/ 1.22 deg bend) Upload Sperry Sun MWD. Continue PU/MU BHA # 10. Trip in hole w/ BHA # 10 f/ 422' to 993'. Rotate through TAM Port collar @ 1001', PU Weatherford ghost reamer MU @ 1064' above bit, continue in hole to 1095'. Shallow test MWD @ 1095', 607 gpm w/ 1560 psi. OK. Trip in hole f/ 1095' to 3473'. Fill every 25 stands. Record PU and SO wt's. Circ 100 bbls to clean up hole. Trip in hole f/ 3473' to 5100'. Record PU And SO wt's. Circ 100 bbis to clean up hole. Held safety stand down w/drilling crew. Trip in hole f/ 5100' to 7129'. Record PU & SO wts Circulate bottom's up @ 7129', circ 407 gpm w/ 1390 psi, rotate 40 rpm w/ 8-9 ft/Ib torque. Trip in hole f/ 7129' to 8119'. Record PU and SO wt's. Trip in hole f/ 8119' to 9205'. Record PU and SO wt's. Circulate bottom's up @ 9205', circ 407 gpm w/ 1270 psi, rotate 40 rpm w/ 9-10 ft/Ib torque. PU wt 195k, SO wt 140k. Trip in hole f/ 9205' to 13135'. Record PU and SO wt's. MU top drive, break circ Tag cement plug @ 13170'. Verify firm cement pumping 3 bpm wJ 630 psi. Stall out 20k on bit. Pressure to 1150 psi . Drill firm cement f/ 13170' to 13400'. Drill w/ 650 gpm @ 3700 psi. on bottom pressure, 3540 psi off bottom pressure. 90 RPM w/ 20-21 k torque on bottom and 18-19K torque off bottom. Bit wt 10k. ECD 11.44 PP9• Sidetrack well @ 13400' MD (6016.83 TVD). Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 13400'- 13529' (6063' TVD) (129') ART 1.56 hrs AST 1.85 hrs., Total hrs on bit = 3.41 hrs., Total hrs on jars = 201.66 hrs, 10 k WOB, 90 rpm's, 188 motor rpm, 650 gpm, 10.2 ppg mw, on bottom pressure 3850 psi, off bottom Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Page 23 ot44 Operations Summary Report Legal Well Name: 1 C-28 Common W ell Name: 1 C-28 Spud Date: 7/30/2005 Event Nam e: ROT -D RILLING Start: 9/11/2005 End: Contractor Name: D15CM @conoco phillip s.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 1 5 Rig Number: 15 Date From - To ', Hours ~ Code , Code Phase ', Description of Operations 10/15/2005 12:30 - 18:00 5.501, DRILL DRLG ~ INTRM1 pressure 3800 psi, on bottom torque 18-24k ft/Ib, off bottom torque 18-21 k ft/Ib, PU wt 280k, SO wt 150k, Rot wt 187 k. ECD 11.27 ppg 18:00 - 22:30 4.50 DRILL ' DRLG INTRMI Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 13529'- 13612' (6100' TVD) (83') ART 1.65 hrs AST 1.06 hrs., Total hrs on bit = 6.12hrs., Total hrs on jars = 204.37 hrs, 8-10 k WOB, 120 rpm's, 188 motor rpm, 650 gpm, 10.2 ppg mw, on bottom pressure 3850 psi, off bottom pressure 3800 psi, on bottom torque 19-24k ft/Ib, ~ off bottom torque 19-21 k ft/ib, PU wt 280k, SO wt 150k, Rot wt 187 k. ~ ECD 11.27 ppg 22:30 - 00:00 1.50 DRILL REAM ; INTRM1 Backream f! 13612' to 13329' @ 650 gpm w/ 3600 psi, rotate @ 120 rpm due to hi torque. 10/16/2005 00:00 - 03:00 ' 3.00 DRILL ~ REAM INTRMI , Backream f/ 13329' to 12670' @ 650 gpm w/ 3600 psi, rotate @ 120 rpm due to hi torque. 03:00 -04:45 1.75' DRILL TRIP INTRM1 Pump out of hole f! 12670' to 11480'. Pump w/ 650 gpm and 3540 psi. ..04:45 - 06:00 1.25 DRILL TRIP INTRMI Pull out of hole on elevators f/ 11480' to 10780'. PU wt 30-40k over prior ' trip in hole. 06:00 - 07:30 1.50:' DRILL TRIP INTRM1 Continue POOH on elevators f! 10780' to 9200'. Record PU & SO wt's every 8 stands. 07:30 - 08:30 1.00 DRILL ~ CIRC INTRM1 Circ and clean floor, monitor well. Pump dry job, Blow down top drive. 08:30 - 10:00 1.50' DRILL TRIP INTRM1 POOH on elevator, inspecting LoTads. Record PU and SO wt's every 5 stands. 10:00 - 12:00 2.00 DRILL ~ TRIP INTRM1 ' Continue POOH f/ 6035' to 2410'. Record PU and SO wt's every 5 stands. 12:00 - 13:00 1.00 DRILL ~ TRIP INTRM1 ~ Continue POOH f/ 2410' to 1064', UD ghost reamer, POOH to BHA @ ' 422'. 13:00 - 14:30 1.50 i DRILL TRIP INTRM1 Work BHA, monitor well, clean rig floor. Break and grade bit. Note: No problems noticed w/ LoTads. No problems w/ BHA noticed. 14:30 - 15:45 1.25 DRILL OTHR INTRM1 ' Download Sperry Sun MWD, Upload MWD. 15:45 - 17:00 1.25 DRILL OTHR ~ INTRM1 MU Hughes MX-C1. 9-7/8" mill tooth bit (3-20/32" nozzle, 1-10/32" i ~ nozzle, MU BHA # 11. Flow test MWD, PU jars and accelerators. 17:00 - 18:00 1.00 DRILL TRIP ' INTRM1 TIH w/ BHA # 11 (mill tooth bit, motor w/ 1.22 deg bend, NO Ghost ' reamer) to 1850'. 18:00 - 19:30 ' 1.50 DRILL TRIP INTRM1 ; Continue trip in hole f/ 1850' to 5175'. Record PU and SO wt's every 5 ' stands. 19:30 - 20:45 1.25 DRILL OTHR INTRM1 Fill pipe. H2S alarm in pits. Secure well. Abandon rig to safe briefing area (shop). All personal accounted for. Security, drilling safety, ~ construction safety, and Pad drill site operator were notified. DSO (Jim ~ ~ Love and Jimmie Heazlett donned SCBA's and checked out. False ~ ; alarm. Re-Man rig (KW Jones crew). Rig electrician check out sensor in pits. Sensor was replaced (reading high w/ 25 ppm calibration gas, I reading was 35 ppm). 20:45 - 21:45 ' 1.00 DRILL ' CIRC ~ INTRMI ! Circ bottoms up +, Circ total of 428 bbls @ 400 gpm w/ 1300 psi. 21:45 - 23:15 1.50, DRILL TRIP INTRM1 ' Continue trip in hole f/ 5175' to 7615'. Record PU and SO wt's every 5 I stands. 23:15 - 23:30 0.25 DRILL CIRC INTRMI Fili pipe, check flow, OK. ' ' 23:30 - 00:00 0.50; DRILL TRIP INTRM1 . Record PU and SO wt s every 5 Continue trip in hole f/ 7615' to 9200 ~ stands. Fill pipe. monitor well. 10!17/2005 ; 00:00 - 02:00 2.00 RIGMNT RSRV ! VNTRM1 ' Slip and cut 105 of 1-3/8" drilling line. Reset crown o matic. 02:00 - 02:30 I 0.50; RIGMNT RSRV INTRM1 Service top drive. Change air filter. I 02:30 - 02:45 0.25' DRILL ~ TRIP INTRM1 i Continue in hole f/ 9200' to 9498'. PU wt 240k, SO wt 120k. ' 02:45 -04:00 ! 1.25 DRILL CIRC '; INTRM1 !~ Circ and condition mud in hole w! recip and rotate fl 9498' to 9399'. ' Rotate w/ 120 rpm, torque 17-18 ft Ib torque. Circ @ 650 gpm w/ 3190 j psi. Rot wt while pumping and picking up 165k. Printed: 12!30/2005 9:34:03 AM • ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1 C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date 10/17/2005 From - To ;Hours Code ! Code I Phase __ ~ - _~_ ~~ 04:00 - 05:45 ~ 1.75 i DRILL ~ CIRC INTRM1 05:45 - 06:00 0.25! DRILL TRiP INTRM1 06:00 - 08:00 i 2.00 ~ DRILL CIRC INTRMI 08:00 - 10:15 I 2.25 10:15 - 12:00. , 1.75 12:00 - 12:45 0.75 12:45 - 18:00 5.25 18:00 - 00:00 ! 6.00 DRILL ( TRIP (INTRMI DRILL CIRC INTRM1 DRILL CIRC INTRM1 i DRILL ~ DRLG INTRM1 DRILL I DRLG !INTRMI 10/18/2005 00:00 - 06:00 6.00 DRILL 'DRLG INTRM1 II .:06:00 - 12:00 6.00 DRILL DRLG ~ INTRM1 12:00 - 15:45 3.75' DRILL DRLG INTRM1 Page 24 of 44 Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations Pull a stand, continue circulating and conditioning mud in hole w/ recip and rotate f/ 9399' to 9300'. Rotate w/ 120 rpm, torque 17-18 ft/ Ib torque. Circ another BU, then pump 35 bbls weighted to 12.2 ppg, 200 vis sweep. Circ @ 650 gpm w/ 3190 psi. Circ surf to surf. POOH f/ 9300' to inside casing @ 9202'. PU wt 235k, SO wt 130k. Continue Circ to condition mud in hole. Circ @ 300 gpm w/ 1013 psi. Rotate w/ 50 rpm, 17-19k ftilb. Pump and spot Steei Lube EP (metal-metal lube)back to within 2000' of surface. Results After Steel tube in hole: PU wt 210k, SO wt 140k, rot wt 160k, torque 13-14k ft/lb. Note: Improvement of 30K f/ PU, improvement of 20K f/ SO wt, Improvement of 4k ft Ib rot torque Trip in hole f/ 9108' to 13608'. Record PU ~ SO wt's every 5 stands. FiII pipe every 25 stands. Circ and condition mud @ 13608'. Circ 650 gpm w/ 3250 psi, rotate 120 rpm. Torque 23-24k ft/Ib. Circ and condition mud. Circ 650 gpm w/ 3250 psi, rotate 120 rpm. Torque 19-20k fUlb. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 13612'- 13791' (6176' TVD) (179') ART 4.14hrs AST .54 hrs., Total hrs on bit = 4.68 hrs., Total hrs on jars = 209.05 hrs, 18-20 k WOB, 120 rpm's, 186 motor rpm, 640 gpm, 10.2 ppg mw, on bottom pressure 3320 psi, off bottom pressure 3240 psi, on bottom torque 20-22k ft/ib, off bottom torque 18-19k ft/Ib, PU wt 270-260k, SO wt 140-150k, Rot wt 195 k. ECD 10.8 ppg Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 13791'- 14075' (6288' TVD) (284') ART 4.19hrs AST .85 hrs., Total hrs on bit = 9.72 hrs., Total hrs on jars = 214.09 hrs, 20-22 k WOB, 120 rpm's, 188 motor rpm, 650 gpm, 10.2 ppg mw, on bottom pressure 3440 psi, off bottom pressure 3310 psi, on bottom torque 20k ft/Ib, off bottom torque 19k ft/Ib, PU wt 265k, SO wt 160k, Rot wt 200 k. ECD 10.8-11.0 ppg Background gas 15-25 units, max gas 90 units while drilling, bit depth 13919'. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 14075'- 14333' (6397' TVD) (258') ART 2.61 hrs AST 1.77 hrs., Total hrs on bit = 14.1 hrs., Total hrs on jars = 218.47 hrs, 19-25 k WOB, 120 rpm's, 186-188 motor rpm, 642-649 gpm, 10.2 ppg mw, on bottom pressure 3440-3520 psi, off bottom pressure 3310-3400 psi, on bottom torque 19-20k ft/Ib, off bottom torque 19-20k fUlb, PU wt 260k, SO wt 160-170k, Rot wt 210 k. ECD 11.15 ppg Background gas 15 units, max gas 63 units. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 14333- 14646' (6486' TVD) (313') ART 1.72 hrs AST 2.73 hrs., Total hrs on bit = 18.55 hrs., Total hrs on jars = 222.92 hrs, 20-22 k WOB, 120 rpm's, 180-187 motor rpm, 620-645 gpm, 10.2 ppg mw, on bottom pressure 3520-3550 psi, off bottom pressure 3390-3450 psi, on bottom torque 19-20k ft/Ib, off bottom torque 19-20k fUlb, PU wt 260-265k, SO wt 170k, Rot wt 210 k. ECD 11.15-11.26 ppg Background gas 23 units, max gas 69 units. Directional drill 9-7l8" hole w/ Sperrydrill 718-6.0 mtr wi 1.22 deg bend f/ 14646'- 14800' (6509' TVD) (154') ART .44 hrs AST 1.75 hrs., Total hrs on bit = 20.74 hrs., Total hrs on jars = 225.11 hrs, 20-25 k WOB, 120 rpm's, 183-187 motor rpm, 630-645 gpm, 10.2 ppg mw, on bottom Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Start: 9/11/2005 Contractor Name: D15CM@conocophillips.com Rig Release: 11/17!2005 Rig Name: Doyon 15 Rig Number: 15 Date S b 10/18/2005 Page 25 of 44 Spud Date: 7/30/2005 End: Group: From - To !Hours ' Code i u I Phase Description of Operations Code 12:00 - 15:45 I 3.75 ~ DRILL ~ DRLG ~ INTRMI I pressure 3510-3520 psi, off bottom pressure 3400 psi, on bottom 15:45 - 16:00 16:00 - 18:00 ~ 18:00 - 23:30 i ~ 23:30 - 23:45 23:45 - 00:00 10/19/2005 00:00 - 01:45 01:45 - 02:00 02:00 - 03:45 03:45 - 04:00 04:00 - 05:30 05:30 - 05:45 05:45 - 06:00 06:00 - 09:30 09:30 - 10:30 10:30 - 12:00 0.251 DRILL (CIRC 2.00 DRILL ICIRC 5.501 DRILL ICIRC 0.25 DRILL OTHR 0.25 DRILL TRIP 1.75 DRILL (TRIP 0.251 DRILL OTHR 1.751 DRILL TRIP INTRM1 INTRM1 INTRM1 INTRM1 INTRMI I NTRM 1 INTRMI I NTRM 1 0.25 DRILL iOTHR INTRM1 1.50 DRILL CIRC IINTRM1 0.25! DRILL CIRC INTRMI 0.25 DRILL TRIP INTRM1 3.50 DRILL TRIP INTRM1 1.OOi DRILL TRIP INTRMI 1.50 ~ DRILL PULD ~ INTRM1 12:00 - 12:15 12:15 - 14:15 14:15 - 15:00 15:00 - 16:00 0.25iDRILL SFTY !INTRM1 2.00 DRILL PULD INTRM1 0.75 DRILL 'OTHR INTRM1 1.001 DRILL PULD I INTRM1 16:00 - 16:30 ' 0.50 ~ WELCT OTHR 16:30 - 17:00 0.50 WELCTL OTHR 17:00 - 18:00 ' 1.00 WELCTL OTHR 18:00 - 19:00 1.00, WELC OTHR 19:00 - 20:00 1.00 T WELCT OTHR 20:00 - 20:30 0.50 WELCTL BOPE INTRM1 I NTRM 1 INTRM1 INTRM1 INTRM1 INTRM1 20:30 - 21:00 I 0.50 WELCTL, OTHR INTRM1 21:00 - 21:45 0.75 ~ CASE ' OTHR INTRM1 21:45 - 22:00 0.25 • CASE RURD INTRM1 22:00 - 22:30 0.501 CASE OTHR INTRM1 torque 19-21 k ft/Ib, off bottom torque 17-20k ft/Ib, PU wt 265-270k, SO wt 170-160 k, Rot wt 210 k. ECD 11.26 ppg Background gas 12 units, max gas 34 units. SPR @ 14746', w/ 10.2 ppg (6502' TVD): # 1 @ 30 spm = 450 psi, 40 spm = 540 psi. # 2 @ 30 spm = 460 psi, 40 spm = 550 psi. Monitor well, Pump weighted to 12.2 ppg Hi-vis sweep @ 650 gpm w/ 3350 psi. Rotate at 120 rpm, torque 20-22 k ft lbs. Pumped 350 bbls. Continue circ @ 650 gpm w/ 3340 psi, rotate @ 120 rpm w/ 20-23k ft Ib torque. Backream setting back a stand every 30 min while circulating hole clean. Depth @ 1800 hrs was 14655'. Continue circ @ 650 gpm w/ 3340-3200 psi, rotate @ 120 rpm w/ 20-22k ft Ib torque. Backream setting back a stand every 30 min while circulating hole clean. Backream f/ 14655' to 13890'. Circ total of 5-1/2 bottoms up (5848 bbls). SO wt w/ rot 190K. PU wt w/ rot 200k. Rot wt 192k Monitor well, blow down top drive. POOH on elevators f/ 13890' to 13702'. POOH on elevators f/ 13702' to 11956'. Record PU i~ SO wt's every 5 stands. SLM. Monitor well. Static. POOH on elevators f/ 11956' to 9201'. Record PU & SO wt's every 5 stands. SLM. Calc fill????. Actual fill 49.5 bbls. Pulled wet w/ mud bucket. Found LoTads on stand 120 and 119 bad. Monitor well. Static. Circ and condition mud inside casing. Circ 400 gpm w/ 1350 psi. Rotate 50 RPM w/ 8k ft Ib torque. Pump 710 bbls. Rot wt 165, SO wt 135k, PU wt 200k Pump dry job. Blow down top drive. POOH on elevators f/ 9201' to 8904'. Record PU & SO wt's every 10 stands inside casing. SLM. POOH on elevators f/ 8904' to 2705. Record PU & SO wt's every 10 stands inside casing. SLM. RIH w/ 8 stands of Weatherford 5" HWDP f/ derrick, UD 5" HWDP. Continue POOH f/ 2705', UD 72 joints(24 stands) Weatherford 5" DP. Strap in pipe shed. PJSM on laying down BHA # 11 (mill tooth bit, motor w/ 1.22 deg bend) POOH, UD BHA # 11. Download MWD/LWD tools. Continue POOH, UD MWD tools, motor and bit. Clear floor of handling tools. Drain stack, Pull FMC wear bushing. RU 7-5/8" test joint w/ 10' pup (5"). RIH, monitor annulus.. Change top pipe rams f/ 4-1/2" x 7" variables to 7-5/8". Continue change top pipe rams f/ 4-1 /2" x 7" variables to 7-5/8". RU testing equipment. Test 7-5/8" top pipe rams to 250 psi low and 4500 psi high. Hold each test 5 min. John Crisp, AOGCC, waived witnessing the test. R/D testing equipment, drain stack. Clear rig floor of tools not needed. RU to run 7-5/8" 29.7 ppf, L-80, BTC-M casing. Dry run 7-5/8" FMC hanger. Land @ 39.25' f/ rig floor. Printed: 1230/2005 9:34:03 AM • ConocoPhillips Alaska Operations Summary Report Page 26 of 44 Legal Well Name: 1C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date 'From - To ,Hours Code ' Code ~ Phase '' Description of Operations 10/19/2005 22:30 - 23:15 0.751 CASE RURD ~ INTRMI Finish RU to run 7-5/8" 29.7 ppf, L-80, BTC-M casing. 23:15 - 00:00 0.75 i CASE SFTY INTRM1 'PJSM on running 7-5/8" casing. Clean up walkway areas prior to running casing. 10/20/2005 00:00 - 03:30 3.50 CASE ~ RUNC INTRM1 'Run 7-5/8" 29.7 ppf, L-80, BTC-M casing. PU/MU Weatherford model 303 FS, 2 jts 7-5/8" 29.7 ppf L-80 BTC-M casing, Weatherford model 402 Float Collar, fill pipe, check floats, ok. Continue running casing to jt # 20 in hole 850'. PU wt 95 k, SO wt 90 k. 103:30 - 04:30 1.00' CASE CIRC ~ INTRMI Circ w/ Dowell swage and 2" hose. Circ @ 3 bpm w/ 116 psi. Circ surf- surt (72 bbis). RJD hose and swage. 04:30 - 06:00 1.50 ~ CASE ,RUNC INTRM1 ;Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 850'-2126' jt # 50 in ho{e. Ran total of 22 bowspring centralizers on first 22 jts. Jts # ; 1 & # 2 ran stops in middle of jt, others on collars (total of 938'). At ~ 2126' PU wt 120 k, SO wt 110 k. 06:00 - 06:45 ~ 0.751 CASE ,RUNC ~ INTRM1 Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 2126'-2595' i jt # 61 in hole. At 2595' PU wt 130k, SO wt 115k. 06:45 - 07:45 ' 1.00 ~ CASE CIRC ' INTRM1 Circ w/ Dowell swage and 2" hose. Circ @ 5 bpm w! 240 psi. Circ BU+ (Circ total of 105 bbls). R/D swage and hose. 07:45 - 10:00 ~ 2.25 CASE RUNC ~ INTRM1 Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 2595'-5082' jt # 120 in hole. At 5082' PU wt 160k, SO wt 130k. 10:00 - 11:15 ; 1.25 CASE CIRC ~ VNTRM1 Circ w/ Dowell swage and 2" hose. Circ @ 5 bpm w! 320 psi. Circ BU+ (Circ total of 205 bbls). R/D swage and hose. 11:15 - 12:00 0.75 CASE RUNC ; INTRM1 ~ Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 5082'-6141' jt # 145 in hole. At 6141' PU wt 170k, SO wt 130k. Installed centering 'guide on jt # 133. 12:00 - 15:00 I 3.00' CASE ~ RUNC INTRM1 Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 6141'-9194' i jt # 217 in hole. At 9194' PU wt 220k, SO wt 135k. ,15:00 - 16:45 , 1.75 CASE ~ RURD INTRM1 Change out bales and elevators. RU Frank's fillup tool, RU stabbing 'board. Held PJSM w/ crew. 16:45 - 18:00 ' 1.25 !CASE CIRC ~ INTRM1 Circ w/ Frank's fillup tool w/ working pipe @ 9194'. Circ @ 5 bpm w/ 550 psi. Circ BU+ (Circ total of 350 bbls). Adding 15 bph water to mud system. ' 18:00 - 19:30 1.50 CASE RUNC INTRM1 'Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 9194'-10179' jt # 240 in hole. At 10179' PU wt 245k, SO wt 135k. ' 19:30 - 20:00 0.50 CASE CIRC INTRM1 Circ w/ Frank's fillup tool w/ working pipe @ 10179'. Circ @ 5 bpm w/ 1570 psi. Circ (Circ total of 100 bbls). i 20:00 - 20:15 ~, 0.25 CASE RUNC ,INTRMI 'Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 10179'-10390' jt # 245 in hole. At 10390' PU wt 260k, SO wt 150k. 20:15 - 21:30 1.25 CASE CIRC INTRM1 !Circ w/ Frank's fillup tool w/ working pipe @ 10390'. Circ @ 5 bpm w/ 570 psi. Circ (Circ total of 400 bbls). PU wt 245 k, SO wt 145k while ~j ~ 'Circ @ 10390'. 21:30 - 22:30 ' 1.001, CASE RUNC ' INTRM1 Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ i ! 10390'-11460' jt # 270 in hole. At 11460' PU wt 280k, SO wt 155k. 22:30 - 23:00 ; 0.50 CASE CIRC INTRM1 ' Circ w/ Frank's fillup tool w/ working pipe @ 11460'. Circ @ 5 bpm w/ ' ! 600 psi. Circ (Circ total of 100 bbls). Pu wt 270 k, SO wt 145k while Circ. 23:00 - 00:00 1.00' CASE ' OTHR INTRMI ',Cross threaded jt # 271 into # 270. UD Jt # 271(bad pin) and # 270 (bad box). Replace w/ Jt # 349 and Jt # 353. 10/21/2005 00:00 - 00:45 ~ 0.75 CASE RUNC INTRM1 ~ Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 11460'-12316' jt # 290 in hole. At 12316' PU wt 300k, SO wt 150k. 00:45 - 01:30 ' 0.75 CASE 'CIRC INTRM1 .Circ w/ Frank's fillup tool w/ working pipe @ 12316'. Circ @ 5 bpm w/ ~~ 660 psi. Circ (Circ total of 200 bbls). Pu wt 285 k, SO wt 145k while Circ. 01:30 - 02:30 1.00 ~ CASE ~I RUNC : {NTRM1 'Continue to PUiMU 7-518" 29.7 ppf, L-80 BTC-M casing f/ 12316' to i Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Page 27 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date 10/21 /2005 10/22/2005 From - To ,Hours Code ', Code' Phase ' Description of Operations _ 01:30 - 02:30 _- 1.00 ~ CASE RUNC INTRMI .. 13164' jt # 310 in hole. At 13164' PU wt 320k, SO wt 145k. 02:30 - 04:15 1.75 CASE ~ CIRC INTRM1 Circ w/ Frank's fillup tool w/ working pipe @ 12316'. Circ'@ 5 bpm w/ 700 psi initial, 610 psi final press. Circ (Circ total of 504bb1s). Pu wt 290-310k k, SO wt 140- 145 k while Circ. 04:15 - 06:00 1.75 ~ CASE ' RUNC INTRM1 Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 13164' to 14739' jt # 347 in hole. At 14739' PU wt 370 k, SO wt 140 k. Washed 'last 2 joints down while circ 6 bpm 850-770 psi w/ Frank's fillup tool (Circ 40 bbls per jt). Installed centering guides on jt # 336, 339, 342 and 345. 06:00 -06:30 0.50 06:30 - 07:15 0.75 07:15 - 10:15 i 3.00 10:15 - 11:00 0.75 CASE ' RUNC INTRM1 CASE OTHR INTRM1 CEMEN~ CIRC ;INTRMI CEMENl f PUMP INTRM1 11:00 - 13:30 ' 2.50' CEME 13:30 - 14:45 ~ 1.25, CEME 14:45 - 15:45 1.00 WELC 15:45 - 17:30 1.75 ~ WELC 17:30 - 18:00 0.50 CASE 18:00 - 21:00 3.00 DRILL 21:00 - 00:00 00:00 - 01:30 01:30 - 03:00 03:00 - 03:45 03:45 - 05:15 05:15 - 0530 05:30 - 06:00 06:00 - 12:00 12:00 - 14:00 14:00 - 18:00 3.00 1.50 1.50 0.75 1.50 0.25 0.50 6.00 2.00 4.00 DRILL DRILL DRILL DRILL DRILL DRILL DRILL DRILL DRILL DRILL DISP INTRM1 PULD (INTRMI NUND EQRP RURD PULD INTRM1 INTRM1 INTRM1 INTRM1 PULD PULD PULD PULD PULD PULD PULD PULD PULD RIRD INTRM1 INTRM1 INTRMI INTRMI INTRM1 INTRMI INTRM1 INTRMI INTRMI INTRMI 18:00 - 18:45 0.75 DRILL RIRD ~ INTRM1 18:45 - 00:00 5.25 DRILL PULD INTRM1 10/23/2005 100:00 - 02:00 2.00 i 02:00 - 03:30 1.50 03:30 - 04:15 ' 0.75 04:15 - 06:00 1.75 06:00 - 08:30 2.50 DRILL DRILL DRILL DRILL DRILL TRIP (INTRMI CIRC INTRM1 TRIP INTRM1 TRIPINTRMI TRIP INTRM1 PU/MU FMC hanger and landing joint. Land casing on hanger w/ 150 k down and 370 k. R/D Frank's fillup tool. RU Dowell cementing head. Blow down top drive. Circ w/ Dowell cement head. Stage rate up to 5 bpm w/ initial pressure of 610 psi. Reciprocate casing at 30 ft stroke 1 spm. Condition mud. YP=18. Held pre job meeting. Batched up slurry. Pumped 10 bbl water and pressure tested lines to 3500 psi. Pump 20 bbl CW100 and 30 bbl MudPush. Drop bottom plug. Pump 58.5 bbl slurry @ 15.8 ppg. Drop top plug. Displace w/ 20 bbl water and turn over to rig pump Displace with 654.48 bbl mud with rig pump. Did not bump plug. Checked floats-OK. Shoe @ 14781'. Float collar @ 14,691'. Reciprocated pipe throughout job. Blow down and Rig down cementing equipment. R/D casing equipment and clear rig floor R/U and install 7-5/8" packoff. RILDS and R/D FMC Change top pipe rams to 4" from 7-5/8" Change out bales on top drive. Service rig and inspect derrick Pre-job meeting. P/U 5"elevators. Install moushole in rotary table. Move lo-tad stand and protectors to floor. Clear MWD equipment from shed. (Also cleaning pits and rockwasher) UD 19 stands of 5" d.p. from derrick UD 12 stands of 5" d.p. out of the derrick. UD 10 stands of 5" d.p. out of derrick and remove Lo-TAD'S Clear floor of Lo-TADS UD 11 stands of 5" d.p. out of derrick and remove Lo-TAD's Clear floor of Lo-TADS UD 4 stands of 5" d.p. out of derrick and remove Lo-TAD'S UD 132 jts of 5" d.p. and remove 44 Lo-Tads. UD 84 jts of 5" d.p. from derrick Removed all 5" handling subs from rig floor. Change saver sub to XT-39. P/U 4" handling equipment. Removed mouse hole from rotary table and cleared rig floor Continue P/U 4" handling tools, TIW valves and crossovers Pre job sfety meeting. P/U 156 joints 4" HT-38 d.p. from pipe shed (4914') Trip in hole w/ 4" HT-38 d.p. from derrick R/U and circulate down d.p. to flush. Bring Super Sliders to rig floor POOH w/ 14 stands of d.p. and stand back POOH. Install Super Sliders 1/jt and rack back. Continue POOH. Install Super Sliders 1/j and rack. Total of 33 stands Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date From - To 10/23/2005 ~ 06:00 -08:30 08:30 - 10:00 ;10:00 - 10:30 10!24/2005 10/25/2005 10:30 - 12:00 12:00 - 17:30 17:30 - 18:00 18:00 - 21:30 21:30 - 22:30 22:30 - 23:00 23:00 - 23:45 23:45 - 00:00 00:00 - 02:00 02:00 - 02:15 02:15 - 03:00 03:00 - 03:15 03:15 - 04:00 04:00 - 04:15 04:15 - 05:00 05:00 - 06:00 06:00 - 08:00 Page 28 of 44 Operations Summary Report 1 C-28 1 C-28 ROT -DRILLING D15CM@conocophillips.com Doyon 15 Hours I Code1`Code~Phase; 2.50~DRILL iTRIP INTRMI 1.50 DRILL (TRIP !INTRMI 0.50 DRILL ISFTY IINTRM1 1.50 5.50 0.50 3.50 1.00 0.50 0.75 0.25 2.00 0.25 0.75 0.25 0.75 0.25 0.75 1.00 2.00 DRILL DRILL DRILL DRILL DRILL DRILL DRILL DRILL DRILL DRILL DRILL DRILL DRILL DRILL DRILL DRILL PULD PULD CIRC TRIP TRIP PULD TRIP PULD TRIP PULD TRIP PULD TRIP PULD TRIP OTHR BOPE INTRMI INTRMI I NTRM 1 INTRM1 INTRMI INTRM1 INTRM1 INTRM1 INTRMI I NTRM 1 I NTRM 1 INTRM1 INTRM1 INTRM1 I NTRM 1 INTRMI INTRMI 08:00 - 12:00 4.00 12:00 - 13:30 1.50 13:30 -14:45 ~ 1.25 14:45 - 18:00 3.25 18:00 - 18:30 18:30 - 19:00 19:00 - 21:00 21:00 - 22:00 22:00 - 23:00 23:00 - 00:00 00:00 - 00:30 00:30 - 02:00 0.50 0.50 2.00 1.00 1.00 1.00 0.50 1.50 WELCT ROPE INTRM1 WELCT ~BOPE 'INTRM1 WELCT, BOPE INTRMI RIGMNT RGRP ~ INTRM1 WELCTL~ OTHR RIGMNT ~ RGRP RIGMNT' RSRV RIGMNT RSRV WELCT BOPE DRILL I PULD RIGMNT RGRP DRILL PULD INTRMI INTRM1 INTRM1 INTRM1 INTRM1 INTRM1 INTRM1 INTRMI 02:00 - 03:00 '. 1.00 DRILL ! OTHR INTRM1 03:00 - 03:30 ' 0.50 DRILL OTHR INTRM1 03:30 - 04:30 1.00; DRILL OTHR INTRM1 04:30 - 05:00 0.50 ~ DRILL I PULD INTRM1 05:00 - 05:45 '~ 0.75 05:45 - 06:00 0.25 06:00 - 07:30 i 1.50 RIGMNT RGRP DRILL OTHR RIGMNT! RGRP INTRM1 INTRM1 INTRMI Start: 9/11 /2005 Rig Release: 11/17/2005 Rig Number: 15 Spud Date: 7/30/2005 End: Group: Description of Operations of 4" HT-38 d.p. with Super Slider stood back. 99 Super Sliders picked !up POOH w/ 42 stands of 4" HT-38 d.p. Clear floor of Super Slider tools and hold safety meeting on picking up d.p. P/U 70 joints of 4" XT-39 d.p. out of pipe shed. ~ P/U 260 jts of 4" XT-39 d.p. out of pipe shed Circulate down drill pipe to flush. POOH w/ 60 stands 4" XT-39 d.p. and stand back. POOH w/ 4" XT-39 d.p. installing 1 Lo-TAD per stand Bring Lo-TAD's to rig floor POOH w/ 4" XT-39 d.p. installing 1 Lo-TAD per stand 'Bring Lo-TAD'S to rig floor POOH w/ 4" XT-39 d.p. installing Lo-TAD'S Bring Lo-TAD'S to rig floor POOH w/ 4" XT-39 d.p. installing Lo-TAD'S Bring Lo-TAD's to rig floor POOH w/ 4" XT-39 d.p. installing Lo-TAD's Bring Lo-TAD's to rig floor POOH w/ 4" XT-39 d.p. installing Lo-TAD'S Clear rig floor and rig up for BOP test Install test plug. R/U test equipment. Fill stack, choke manifold and ~ lines. R/U test pump and chart recorder Test Hydril to 250 psi/3500 psi. Test upper pipe rams, HCR valves,and choke manifold to 250 psi/ 4100 psi. John Crisp, AOGCC, waived witnessing test. Test bottom pipe rams to 250 psi/4100 psi. Test accumulator and gas detectors. Test Blind rams to250 psi/4100 psi. 'Retrieve test plug. R/d test joint and test equipment. Blow down choke 'and kill lines and choke manifold. Clear floor Install new "Y" in standpipe manifold and M/U all connections and 4" valves. Weld up 4" drip plate around penetration in floor under stand ;pipe. Replace left side clamp cylinder on left side of Iron Roghneck. Rebuilt lower torque cylinder on Iron Roughneck. Weld spinner section guard on Iron Roughneck and adjust hydraulic hoses. Install wear ring. O.D.=10-3/4" I.D.=7-1/8", Length=12" ;Adjust iron Roughneck hoses Cut and slip 130' of drilling line Service rig and top drive I M/U and test HT-38 TIW and dart valves Safety meeting. M/U bit, geo-pilot and flex collar Replace hose on iron roughneck. PU smart stab- MWD, LWD nukes, PWD, HOC, welded blade stab, NM float sub. Upload MWD tools. Change out Slim Phase battery on RLL tool. Reconnect to tool. i PU one flex drill collar, MU x-o's, shallow test MWD. Pressure test stand pipe and geo skid to 4000 psi. OK. Fix hose on iron roughneck. Load nuke sources. Repair hose fitting on top clamp cylinder of iron roughneck. Also re-routed hoses. Printed: 12/30/2005 9:34:03 AM C ConocoPhillips Alaska 1.25 0.25 2.50 2.50 1.25 0.25 0.50 0.50 1.00 0.50 1.00 4.50 Legal Well Name: 1C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours ~ Code ,Code Phase 10/25/2005 107:30 - 09:30 I 2.00 DRILL !PULD INTRM1 ' 09:30 - 12:00 2.50 i CEMEN7~TRIP ~ INTRM1 III 12:00 - 16:45 ~ 4.751 CEMENTTRIP , INTRM1 16:45 - 18:00 I 1.25 18:00 - 19:00 1.00 19:00 - 21:00 2.00 21:00 - 22:00 1.00 22:00 - 23:00 1.00 23:00 - 23:15 0.25 23:15 - 23:30 ~ 0.25 23:30 - 00:00 ' 0.50 10/26/2005 00:00 - 01:00 ' 1.00 01:00 - 02:00 ~ 1.00 02:00 - 03:15 03:15 - 03:30 03:30 - 06:00 06:00 - 08:30 08:30 - 09:45 09:45 - 10:00 10:00 - 10:30 10:30 - 11:00 11:00 - 12:00 12:00 - 12:30 12:30 - 13:30 13:30 - 18:00 18:00 - 19:30 19:30 - 20:00 20:00 - 22:00 1.50 0.50 Operations Summary Report CEMENl~DSHO 'INTRM1 CEMENl~TRIP ; INTRM1 CASE CIRC I INTRM1 CASE OTHR INTRM1 CASE I DEOT ! INTRM1 CASE DEOT 'INTRM1 CASE CIRC INTRMI CASE 'DEOT INTRMI CASE DEOT (INTRMI CASE DEOT '; INTRM1 CASE DRILL DRILL DRILL DRILL DRILL DRILL DRILL DRILL DRILL DRILL DRILL OTHR CIRC TRIP TRIP TRIP TRIP OTHR PULD OTHR PULD PULD TRIP INTRM1 INTRMI I NTRM 1 INTRM1 INTRM1 INTRM1 INTRM1 INTRMI INTRMI I NTRM 1 INTRMI INTRM1 CASE CIRC INTRM1 CASE ,DEOT INTRM1 2.OOi DRILL (TRIP IINTRM1 Page 29 of 44 Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations '.Continue PUIMU BHA #12. RIH w/ 33 stands of Weatherford 4" HT38 drill pipe. Pickup jars, 2 ;stands of Weatherford 4" HR 38 drill pipe, then accelarator jars. RIH w/ Weatherford 4" HT 38 f! 3745' to 8858.82' install crossover, RIH 4" Weatherford XT 39 drill pipe to 14598', filling pipe every 25 stands. '~ Rotate @ 5 rpm to break in seals on Geo Pilot 5200 (ser # TL10). MU top drive, fill pipe. Drill wiper rubbers and cement f/ 14598' to 14642'. Drill w/ 45 rpm and 300 gpm 3200 psi, torque 9k ft Ib. Rot wt 142k. Drill w/ 5k WOB. Black rubber at shakers on bottoms up (432 bbls pumped). Continue drilling cement inside of 7-5/8" casing f/ 14642' to 14670' got orange rubber in returns. WOB 4k, 50 rpm w/ 8k torque. 300 gpm w/ ' 3200 psi. Rot wt 155k. Circ and condition mud f/ casing test. Circ total of 872 bbls. MW even out @ 9.8 ppg. Stand back a stand to 14640'. Blow down top drive. RU f/ casing test. Pump through kill line and cement line to clear air f/ lines. Test casing @ 14640'. Pump @ 1/2 bpm, recording pressure vs volume. Pressure to 3500 psi w/ 108 strokes(9.23 bbls). Pressure bleed ;off to 1100 psi in 40 min. Check surface equipment, OK. Bleed off pressure. Bled back 2 bbls to pits. Open top pipe rams. Pump 20 bbls through cement line and string. Pump 3 bbls through kill line. ,Pump @ 1/2 bpm, recording volume vs pressure up to 3500 psi w/ 142 strokes (12.14 bbls). After pumping @ 1/2 bpm, recording volume vs pressure up to 3500 psi w/ 142 strokes (12.14 bbls). Pressure bled off to 1200 psi in 35 min. Bleed off all pressure. Total of 2.75 bbls bled back. RU/Fill 10-3/4" x 7-5/8" annulus w/ water. Pressure 7-5/8" up to 3000 psi, annulus came up to 300 psi. Pressure of 7-5/8" declining, and also ,pressure of annulus declining. R/D testing lines. B{ow down lines. Mix dry job. Monitor well, static. Pump dry job. Blow down top drive. POOH f/ 14640' to 9512'. PU wt 190k, SO wt 120k. POOH f/ 9512' to 3745', UD accelerators and Daily Jars. i Continue POOH f/ 3745' to 420'. Stand back 4" Weatherford HWDP, UD BHA. PJSM w/ Sperry Sun. Remove nuke sources. Continue to UD BHA #12. Plug into Sperry tools. Download MWD tools, UD BHA. UD Sperry Sun Geo Pilot and bit. i PU Baker Retrievamatic f/ 7-5/8" 29.7 ppf casing. RIH w/ Baker retievamatic on 4" Weatherford DP. Run in speed 60-70 ,fpm. RIH stand # 90. Circ and condition mud. Getting air out of system. PU wt 165k, SO wt 115k. Set Baker 7-5l8" 29.7 ppf retrievamatic packer @ 8522' w! 3 rounds RH turns. Slack off to 80k on weight indicator.Test 7-5/8" casing (pressure up thru kill line) @ 1/2 bpm, j monitoring pressure vs. volume. Pump total of 50 strokes (4.275 bbls) Ito achieve 3580 psi. (3550 psi when shut in). Held pressure 10 minutes @ 3550 psi final pressure. No increase in pressure on 10-3/4" x 7-518" annulus. Bleed off pressure, open rams. Release Baker retrievamatic RIH w/ Baker retievamatic on 4" Weatherford DP f/ 8522' to 11734'. Printed: 1213012005 9:3A:03 AM • ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1 C-28 Page 30 of 44 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11!17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date 10/26/2005 From - To 'Hours ' Code ~ Sub I Phase Code - - __ ___ 20:00 - 22:00 2.00 22:00 - 22:30 0.50 DRILL 'TRIP ~ INTRM1 CASE ~ DEQT I INTRM1 22:30 - 23:45 23:45 - 00:00 10/27/2005 i 00:00 - 01:00 01:00 - 01:15 01:15 - 02:30 02:30 - 02:45 02:45 - 09:45 09:45 - 10:00 10:00 - 10:15 10:15- 11:15 11:15 - 12:00 12:00 - 12:15 12:15 - 12:45 12:45 - 13:15 13:15- 15:00 15:00 - 18:00 18:00 - 19:30 1.251 DRILL I TRIP 0.25 I CASE !DEQT 1.00 CASE ; DEOT 0.251 DRILL (TRIP 1.25 CASE ~ DEQT 0.25 DRILL TRIP 7.00 DRILL TRIP 0.25, DRILL OTHR 0.251 DRILL SFTY 1.00: DRILL PULD 0.75 DRILL ' OTHR 0.25 DRILL OTHR 0.50, DRILL PULD 0.501 DRILL ~ PULD 1.75! DRILL (TRIP 3.001 DRILL (TRIP 1.501 DRILL I TRIP INTRMI INTRM1 INTRM1 INTRM1 INTRM1 INTRMI INTRM1 INTRM1 INTRM1 INTRM1 INTRM1 INTRMI I NTRM 1 INTRMI I NTRM 1 I NTRM 1 INTRMI Description of Operations Run in speed 60-70 fpm. RIH stand # 124. At Baker retievamatic element depth of 11734'. PU wt 195k, SO wt 125-130k. Set Baker 7-5/8" 29.7 ppf retrievamatic packer @ 11734' w/ 4 rounds RH turns. Slack off to 85k on weight indicator.Test 7-5/8" casing (pressure up thru kill line) @ 1/2 bpm, monitoring pressure vs. volume. Pump total of 62 strokes (5.301 bbls) to achieve 3540 psi. (3530 psi when shut in). Held pressure 5 minutes @ 3520 psi final pressure. No increase in pressure on 10-3/4" x 7-518" annulus. Bleed off pressure, open rams. Release Baker retievamatic. RIH w/ Baker retievamatic on 4" Weatherford DP f/ 11734' to 14570'. Run in speed 60-70 fpm. RIH stand # 154. At Baker retievamatic element depth. of 14570'. PU wt 220k, SO wt 135k. Set Baker 7-5/8" 29.7 ppf retrievamatic packer @ 14570' w/ 5 rounds RH turns. Slack off to 92k on weight indicator. At Baker retievamatic element depth of 14570'. PU wt 220k, SO wt 135k. Slacked off to 92k on weight indicator.Test 7-5/8" casing (pressure up thru kill line) @ 1/2 bpm, monitoring pressure vs. volume. Pump total of 75 strokes (6.4125 bbls) to achieve 3560 psi. (3530 psi when shut in). Held pressure 15 minutes @ 3510 psi final pressure. No increase in pressure on 10-3/4" x 7-5/8" annulus. Bleed off pressure, open rams. Release Baker retievamatic. RIH w/ Baker retievamatic on 4" Weatherford DP f/ 14570' to 14660'. Run in speed 60-70 fpm. RIH stand # 155 to 64' in (element of retrievamatic @ 14660). At Baker retrievamatic element depth of 14660'.PU wt 220k, SO wt 137k. Slacked off to 90k on weight indicator.Test 7-5/8" casing (pressure up thru kill line) @ 1/2 bpm, monitoring pressure vs. volume. Pump total of 75 strokes (6.4125 bbls) to achieve 3560 psi. (3560 psi when shut in). Held pressure 40 minutes @ 3550 psi final pressure. No increase in pressure on 10-314" x 7-5/8" annulus. Bleed off pressure, open rams. Release Baker retievamatic. Measured 5 3/4 bbl returns. Charted test. Pull stand # 155 and stand back in derrick. Blow down top drive. POOH w/ Baker retrievamatic. UD packer. Clean and clear rig floor. RU to PU BHA # 14 (6-3/4" bit, geo Pilot, MW D/LW D). PJSM on PU BHA # 14. PU/MU BHA # 14. MU Security 6-3/4" FSF 2641 PDC bit, Sperry Sun Geo Pilot (5200) ser # TL10, NM GP flex, smart stab, 4-3/4" HOC, GR/RES, nukes, PWD tool, HOC, welded blade stab, float sub, circ sub. Test and download Sperry Sun MWD tools. Shallow test mwd tools @ 120'. Pump 300 gpm w/ 1120 psi. PU NM DC to 150', PJSM on loading nuke sources. Load sources. PU NM DC, (2) Weatherford crossovers, Daily DNT jars, (5) 4" HWDP, x-o to 373'. RIH w/ 33 stands Weatherford 4" HT 38 dp, PU Daily DNT jars, then 2 stands Weatherford 4" HT 38 dp, then Accelerators to depth of 3750.07' Fill pipe. Continue RIH w/ Weatherford 4" dp f/ 3743' to 13235'. Filling pipe every 25 stands. PU wt 200k, SO wt 120k. Continue RIH w/ Weatherford 4" dp f! 13235' to 14670'. Filling pipe every 25 stands. PU wt 215k, SO wt 135k, Rot 160k. Printed: 12/30/2005 9:34:03 AM r~ ConocoPhillips Alaska Page 31 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1 C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date 10/27/2005 From - To Hours Code 19:30 - 19:45 ' 0.25 DRILL j 19:45 - 00:00 ~ 4.251 CEME~ Sub ~ Phase. 'Code ~ Description of Operations ~ REAM ! INTRM1 ~ FiN pipe. Wash and ream f/ 14462' to 14670'. DSHO INTRMI MU top drive, fill pipe. Drill cement f/ 14670' to 14792'. Float collar appeared to be @ 14704' (13' deep). Drill w/ 45 rpm and 280 gpm 2260 psi, torque 8k ft Ib. Rot wt 160k. Drill w/ 5k WOB. REAM INTRMI Drill from 14, 871' to 14,919' (corrected depths. This was thought to be drilling cement and rat hole at the time of drilling, turns out to be new formation, after pipe correction of 78.69 ft). Drilled w/ 40 rpm,9k torque on bottom, 8k torque off bottom, MW 9.8 ppg, pumping 273-277 gpm w/ 2350-2290 psi on bottom, off bottom 2138 psi. WOB is 4-6 k. PU wt 215-205k, SO wt 135-138k. Rot wt 160-162k. ECD 10.73 ppg CIRC INTRM1 Circulate and condition mud for FIT @ 300 gpm, 2740 psi, 40 rpm, 7k ft-Ibs torque. Mud was aired up. CIRC INTRMI Pump 40 bbl spacer @ 9.7 ppg. Displace well with 9.2 ppg Flo-pro mud WIPR INTRM1 'Clean out under shakers and ditches. PuII up into shoe from 14,919' to i 14,727' Blow down top drive. P/U= 215k, S/0= 135k, Rot=160k OTHR INTRMI RU f/ Formation integrity test. FIT ; INTRM1 ~ Perform formation integrity test w! bit inside casing @ 14727. The 7-5/8" casing shoe is @ 14781' (6507.7' TVD). MW 9.2 ppg. Applied 1120 psi w/ 31 strokes from #1 mud pump (2.7 bbls) for EMW of 12.5 ppg. Bled back 2.88 bbls when released pressure. Charted test. OTHR INTRMI R/D tools f/ FIT. Blow down choke manifold and kill line. !TRIP PROD 'Trip in hole f! 14727 to 14885', pumped up check shot survey @ 14915'. Perform PWD/ECD baseline test w/ 9.2 ppg mud @ 14915'. .300 gpm w/ 60 rpm = 10.26 EMW. 300 gpm w/ 100 rpm = 10.29 EMW. ~ 350 gpm w/ 60 rpm = 10.36 EMW. 350 gpm w/ 100 rpm = 10.41 gpm. Record SPR's @ 14915'. PU wt 215k, SO wt 140k. DRLG PROD 'Directional drill 6-3/4" hole w/ SperrySun GeoPilot f/ 14919'- 15055' (6516' TVD) (136') ART 2.38 hrs, Total hrs on bit = 2.38 hrs., Total hrs on jars = ???? hrs, 10-15 k WOB, 90 rpm's, 275 gpm, 9.2 ppg mw, on !bottom pressure 1850 psi, off bottom pressure 1800 psi, on bottom ' torque 10k ft/Ib, off bottom torque 6-7k fUlb, PU wt 210k, SO wt 140 k, Rot wt 150 k. ECD 10.27 ppg DRLG I PROD Directional driA 6-3l4" hole w/ SperrySun GeoPilot f/ 15055'- 15378' (6501' TVD) (323') ART 4.28 hrs, Total hrs on bit = 6.66 hrs., Total hrs on jars = ???? hrs, 10-12 k WOB, 100-140 rpm's, 231-350 gpm, 9.2 ppg mw, on bottom pressure 1510-3030 psi, off bottom pressure ,1560-2980 psi, on bottom torque 10k fUlb, off bottom torque 8-10k ft/Ib, PU wt 210k, SO wt 135 k, Rot wt 160 k. ECD 10.27-10.81 ppg REAM 'PROD Backream out of hole f/ 15378' to 14727'. Ream with 100 rpm, 7k ft Ib torque. Pump 300 gpm w/ 2500 psi. Rotating up w! 165k. Down wt 125k. OTHR ~ PROD Blow down top drive. Monitor well. Static. ;TRIP I PROD ;POOH wet f/ 14727 to 14634'. CIRC j PROD ~ Circ up sample for geologist. TRIP PROD POOH wet f/ 14634' to 10546'. SLM. PU wt @ 10546' is 175k, SO i ~~ 'weight @ 10546' is 122k. TRIP ~ PROD POOH wet f/ 10546' to 2922'. SLM. PU wt @ 2922' is 115k, SO weight @ 2922' is 105k. ~ ~ Calc fill 765.05 bbls, Actual fill 92.5 bbls 10/28/2005 00:00 - 02:30 I 2.50 DRILL 02:30 - 04:00 f 1.501 DRILL 04:00 - 05:30 ! 1.50 DRILL 05:30 - 06:00 0.50 DRILL 06:00 - 07:00 ' 1.00 DRILL 07:00 - 08:45 1.75 DRILL 08:45 - 09:45 i 1.00 -DRILL 09:45 - 10:45 1.00 DRILL 10:45 - 12:00 1.25 DRILL 12:00 - 18:00 6.00 ,DRILL 18:00 - 19:45 1.75 ~ DRILL 19:45 - 20:15 ~ 0.50 ~ DRILL 20:15 - 20:30 0.25 DRILL 20:30 - 21:00 0.50... DRILL 21:00 - 00:00 3.001 DRILL 10/29/2005 100:00 - 06:00 I 6.00; DRILL 06:00 - 07:45 1.75 DRILL ;TRIP PROD .POOH wet f/ 2922' to 437. SLM. No correction f/ SLM. 07:45 - 08:00 0.25 i DRILL PULD ~ PROD UD BHA # 14. 08:00 - 08:30 0.50 j DRILL SFTY PROD PJSM w/ Sperry Sun hands. Then remove Nuke sources. Printed: 12/30/2005 9:34:03 AM ConocoPhillips Alaska Page 32 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1 C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9!1112005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date 10/29/2005 From - To ' Hours Code I Code ~I Phase 08:30 - 08:45 08:45 - 09:30 09:30 - 10:15 10:15 - 10:45 10:45 - 12:00 12:00 - 13:00 13:00 - 13:45 13:45 - 14:00 14:00 - 14:45 14:45 - 15:00 15:00 - 15:30 15:30 - 16:30 16:30 - 18:00 18:00 - 20:00 20:00 - 20:30 20:30 - 23:30 23:30 - 23:45 23:45 - 00:00 10/30/2005 00:00 - 00:30 00:30 - 01:30 .01:30 - 05:00 ~ 05:00 - 06:00 .06:00 - 12:00 112:00 - 18:00 18:00 - 22:30 22:30 - 00:00 10/31/2005 00:00 - 06:00 06:00 - 09:30 0.251 DRILL PULD :;PROD 0.75 DRILL IOTHR PROD 0.75. DRILL PULD PROD 0.50 DRILL ,PULD PROD 1.25 DRILL ~ PULD PROD 1.00 DRILL PULD ~ PROD 0.75' DRILL OTHR ' PROD 0.25 DRILL ' OTHR PROD 0.75; DRILL OTHR PROD 0.251 DRILL OTHR PROD 0.50i DRILL SFTY PROD 1.00 DRILL ,PULD PROD 1.50 DRILL TRIP PROD 2.00 DRILL TRIP ,PROD 0.50 DRILL PULD PROD 3.00 DRILL OTHR PROD 0.25 RIGMNT RSRV PROD 0.25' RIGMNT RSRV ~ PROD 0.50 RIGMNT' RSRV PROD 1.00 RIGMNT RSRV ' PROD 3.501 DRILL ( TRIP PROD 1.00 DRILL ~ REAM ~ PROD 6.00 DRILL 'REAM PROD 6.00 DRILL ! REAM PROD 4.50 DRILL REAM PROD 1.50 ~ DRILL I REAM PROD 6.00 DRILL REAM PROD 3.50 DRILL REAM I PROD I i Description of Operations UD BHA # 14. Download MWD tools. UD BHA # 14. Clear and clean rig floor. UD handling tools. PU BHA # 15. MU Hughes 6-3/4" HCM 505z PDC bit, Sperry Sun motor w/ 1.5 deg bend, float sub, welded blade stab, HOC, Sperry Sun MWD. PU nukes, PWD, orient and plug into tools. Download MWD tools. Shallow test MWD. Pump 349 gpm w/ 710 psi. Retest MWD and download MWD tool. Shallow test MWD. Pump 350 gpm w/ 710 psi. PJSM w/ Sperry Sun hands. Install Nuke sources. Continue PU BHA # 15. RIH w/ Weatherford 4" HT 38 dp f/ 458' to 4243'. PU wt @ 4243' is 125k, SO wt @ 4243' is 100k. RIH w/ Weatherford 4" HT 38 dp f/ 4243' to 7558'. Fill pipe every 25 stands. Change out top single on stand 75 (4" HT-38). Bad box. Replace joint. Change out saver sub on top drive. PJSM on cutting drilling line. Prepare to slip and cut 135' of drilling line. Prepare to slip and cut 135' of drilling line. Service top drive and grease crown. RIH w/ Weatherford 4" HT 38 then XT39 dp f/ 4243' to 7558'. Fill pipe every 25 stands. Trip displacement calculated 88.4 bbls, actual 95 bbls. Fill pipe, orient down, start troughing @ 15200' to 15209'. TVD 6511'. Pump @ 321 gpm w/ 3330 psi, PU wt 210k. Down wt 135k. Start troughing @ 15200' to 15248'. TVD 6511'. Pump @ 339 gpm w/ 3450 psi, PU wt 200k. Down wt 135k. Time drill 3 min per inch f/sidetrack F/ 15248' to 15254' (6511 TVD). Drilling w/ Hughes 6-3/4" HCM 5052 jetted to .752 TFA and SperryDrill 6l7-6.0 wl ABI and 1.5 deg bend. AST 5.13 hrs, Total hours on bit = 5.13 hrs, Total hours on Jars 11.79 hrs. Pumping 339 gpm w/ 3460 psi on botom, 3440 psi off bottom. PU wt 210k, SO wt 125k. Time drill 3 min per inch f/ sidetrack F/ 15254' to 15258' (6511 TVD). Drilling w/ Hughes 6-3/4" HCM 5052 jetted to .752 TFA and SperryDrill 6/7-6.0 w/ABI and 1.5 deg bend. AST .87 hrs, Total hours on bit = 6. hrs, Total hours on Jars 12.66 hrs. Pumping 339 gpm w/ 3460 psi on botom, 3440 psi off bottom. PU wt 210k, SO wt 125k. Time drill 3 min per inch f/ sidetrack F/ 15270' to 15272' (6511 TVD). Drilling w/ Hughes 6-3/4" HCM 5052 jetted to .752 TFA and SperryDrill 6/7-6.0 w/ABI and 1.5 deg bend. AST .3 hrs, Total hours on bit = 6.3 hrs, Total hours on Jars 12.96 hrs. Pumping 339 gpm w/ 3460 psi on botom, 3440 psi off bottom. PU wt 210k, SO wt 125k. Time drill 3 min per inch f/ sidetrack F/ 15272' to 15281' (6510 TVD). Drilling w! Hughes 6-3/4" HCM 5052 jetted to .752 TFA and SperryDrill 6/7-6.0 w/ ABI and 1.5 deg bend. AST 2.45 hrs, Total hours on bit = 8.75 hrs, Total hours on Jars 15.41 hrs. Pumping 320 gpm w/ 3920 psi on botom, 3940 psi off bottom. PU wt 210k, SO wt 135k. Attempt to time drill 3 min per inch f/ sidetrack F/ 15278.' to 15305' (6510' TVD). Drilling w/ Hughes 6-3/4" HCM 5052 jetted to .752 TFA and SperryDrill 6/7-6.0 w/ ABI and 1.5 deg bend. AST 1.09 hrs, Total hours on bit = 9.84 hrs, Total hours on Jars 16.5 hrs. Pumping 320 gpm Printed: 12/30/2005 9:34:03 AM 00:00 - 00:45 00:45 - 01:15 01:15 - 01:45 ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date 'From - To 'Hours Code I' Sub ~ Phase 'Code 10/31/2005 06:00 - 09:30 ~ 3.50 DRILL ~ REAM ~ PROD 09:30 - 10:00 0.50 -DRILL OTHR PROD 10:00 - 12:00 2.00 DRILL TRIP ~ PROD ' 12:00 - 18:00 i 6.00 1 DRILL TRIP PROD 18:00 -19:30 1.50I ~ DRILL TRIP PROD 19:30 - 20:00 0.50, DRILL OTHR PROD ` 20:00 - 21:00 ; 1.00 DRILL , OTHR PROD 21:00 - 21:30 0.50 DRILL PULD PROD 21:30 - 22:00 0.50' ~ DRILL OTHR PROD 22:00 - 23:00 1.00 DRILL OTHR I PROD 23:00 - 00:00 . 1.001 DRILL ,PULD PROD 11 /1 /2005 01:45 - 02:45 02:45 - 03:00 03:00 - 03:45 • 0.75 0.50 0.50 1.00 0.25 0.75 DRILL OTHR DRILL OTHR DRILL SFTY DRILL ,PULD DRILL iTRIP DRILL I PULD 03:45 - 06:00 2.25 ~ DRILL TRIP 06:00 - 11:15 I 5.25 DRILL ' TRIP 11:15 - 13:45 ~ 2.50 DRILL REAM 13:45 - 14:00 I 0.251 DRILL i WIPR 14:00 - 15:30 ! 1.50 RIGMNT RGRP PROD PROD PROD PROD PROD PROD PROD PROD PROD PROD PROD 15:30 - 15:45 0.25 DRILL i WIPR 'PROD 15:45 - 18:00 2.25 ~, DRILL REAM PROD 18:00 - 19:37 1.62. DRILL REAM I PROD 19:37 - 19:38 I 0.02 DRILL IOTHR 19:38 - 00:00 I, 4.371 DRILL DRLG PROD PROD Page 33 of 44 Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations w/ 3920 psi on botom, 3940 psi off bottom. PU wt 210k, SO wt 125k. MWD survey, monitor well. Static. POOH wet w/ 1.5 deg motor to change bend to 1.76 deg. POOH f/ 15305' to 11303'. POOH wet w/ 1.5 deg motor to change bend to 1.76 deg. POOH f/ 11303' to 2400' POOH wet w/ 1.5 deg motor to change bend to 1.76 deg. POOH f/ 2400' to 370' Work BHA # 15. PJSM on nuke sources. Remove sources. Download MWD. Work BHA # 15. Inspect bit, adjust bend on motor f/ 15. deg to 1.76 deg. Check motor bearings. Orient MWD to motor. PU BHA # 16. MU Hughes 6-314" HCM 505z PDC bit, Sperry Sun 5" OD motor 6/7-6.0 with ABI w/ 1.76 deg bend, float sub, welded blade stab, GR/RES, HOC, Nukes, PWD, HOC. MU crosovers to be able to shallow test tools after downloading. Start uploading tools @ midnight. Uploading tools MWD tools. Shallow test tools @ 120'. Good test, blow down top drvie. Pre job safety meeting on nuke sources w/ crew. PU (1) flex drill collar to 150'. MU (1) flex collar, change out elevators to 4". MU x-o's and MU jars, then HWDP to 370' RIH w/ BHA #16 on 12 stands Weatherford 4" HT 38 dp to 1504'. Change out elevators to 3 112". MU crossover, Anderguage agitator, shock tool and crossover to 1526'. Then change out elevators back to 4". Trip in hole w/ Weatherford 4" dp, install jars and accelerator jar, then running dp to 5190'. PU wt 118k, SO wt 108k. Continue trip in hole w/ Weatherford 4" dp, install jars and accelerator jar, then running dp to 14943'. Record PU & SO wt's, fill pipe every 25 stands. MU top drive, orient down, trough f/ 15000' to 15095'. PU wt 220k, SO wt 130k. Pumping 300 gpm w/ 3350 psi. POOH f/ 15095' to 14744' to work on # 2 mud pump liner gasker # 3 cylinder. Repair liner gasket on # 2 pump, # 3 cylinder. Note: # 1 pump down while repairing unibolt to attatch shock hose, unavailable to use at the time. Trip back in hole f/ 14744' to 15022' to continue troughing f/sidetrack. MU top drive, orient down, trough f/ 15022' to 15087'. PU wt 220k, SO wt 130k. Pumping 300 gpm w/ 3350 psi. Continue troughing well f/ 15087' to 15118'. PU wt 220k, SO wt 130k. Pumping 300 gpm w/ 3350 psi. Well was sidetracked @ 15115' while troughing. Sidetrack original well @ 15115' (6522' TVD). (Survey 15141', 88.47 deg, azm 106.6 deg, 6522' TVD) (Survey @ 15188', 89.09', azm 108.18 deg, 6523.44 TVD ') (Survey @ 15234', 89.14 deg, azm 103.95 deg, 6524' TVD) {Survey @ 15282', 90.07 deg, azm 104.27 deg, 6524' TVD) Sidetracking original well f/ 15115' to 15370' (TVD = 6523'). ART = 1.48 hrs, AST = 1.22 hrs. Total hrs on bit =2.7 hrs. Total hours on Jars Printed: 12/30/2005 9:34:D3 AM ConocOPhillips Alaska Page 34 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: .Doyon 15 Rig Number: 15 Date 11/1/2005 11 /2/2005 From - To Hours Code ' Code j Phase Description of Operations ---. -. -_ 19:38 - 00:00 4.37 DRILL DRLG PROD = 19.2. Pumping 300-325 gpm w/ 3350-4100 psi on bottom, 3350-3500 ~ psi off bottom. Motor RPM is 231-250. When rotating string @ 50 rpm 00:00 - 00:30 0.50 I DRILL !DRLG i I 00:30 - 06:00 5.50 DRILL i DRLG 06:00 - 12:00 6.00 12:00 - 13:00 1.00 13:00 - 14:15 1.25 14:15 - 17:00 ~ 2.75 17:00 - 18:00 1.00 18:00 - 19:30 i 1.50 19:30 - 20:00 0.50 20:00 - 21:30 1.50 DRILL DRLH DRILL DRLH DRILL CIRC i DRILL ~ DRLH i DRILL CIRC PROD PROD PROD PROD PROD PROD PROD DRILL SFTY PROD i I DRILL OTHR 'PROD DRILL WIPR ',PROD torque is 8-9k fUlb, off bottom. torque 7-8k. ECD=10.8-10.9 ppg. Background gas 25 units.PU wt 200k, SO wt 125k Sidetracking original well W! Sperrydrill motor w/1.76 deg bend f/ 15370' to 15378' (TVD = 6523') (8'). ART = 0.0 hrs, AST = .02 hrs. Total hrs on bit =2.72 hrs. Total hours on Jars = 19.22. Pumping 307 gpm w/ 3850 psi on bottom, 3700 psi off bottom. Motor RPM is 236. ;When rotating string @ 50 rpm torque on bttm is 8-9k fUlb, off bottom 'torque 7-8k fUbl. ECD=10.84 ppg. Background gas 25 units. PU wt 200k, SO wt 125k. ~ Directional drill 6-3/4" hole w/ Sperrydrill motor w/ 1.76 deg bend f/ 15378'- 15491' (6520' TVD) (113') ART .72 hrs, AST 1.26 hrs. Total hrs on bit =4.7 hrs.Total hrs on jars = 21.4 hrs, WOB 5-6k, 50 rpm's, motor rpm's 236-240, pumping 307-312 gpm, 9.2 ppg mw, on bottom pressure 3850-3970 psi, off bottom pressure 3700- 3740 psi, on bottom torque 8-9k fU{b, off bottom torque 7-8k ftllb, PU wt 200k, SO wt 128 k, Rot wt 160 k. ECD 10.8-10.94ppg !Directional drill 6-3/4" hole w! Sperrydrill motor w/ 1.76 deg bend f/ 15491'- 15734' (6526' TVD) (243') ART 2.13 hrs, AST 1.40 hrs. Total hrs on bit =8.23 hrs.Total hrs on jars = 24.73 hrs, WOB 5-6k, 50-60 rpm's, motor rpm's 237-243, pumping 308-315 gpm, 9.2 ppg mw, on bottom pressure 3890-4200 psi, off bottom pressure 3740-3940 psi, on bottom torque 8-9k ft/lb, off bottom torque 6-7k ft/Ib, PU wt 205k, SO wt .128-125 k, Rot wt 160-150 k. ECD 10.94-11.09 ppg 'Directional drill 6-3/4" hole w/Sperrydrill motor w/ 1.76 deg bend f! 15734'- 15770' (6521.61' TVD) (36') ART .28 hrs, AST .28 hrs. Total hrs on bit = 8.79 hrs.Total hrs on jars = 25.01 hrs, WOB 5-6k, 50-60 rpm's, ,motor rpm's 237, pumping 308 gpm, 9.2 ppg mw, on bottom pressure 3890 psi, off bottom pressure 3680 psi, on bottom torque 8-9k ft/Ib, off bottom torque 6-7k ftllb, PU wt 205k, SO wt 125 k, Rot wt 150 k. ECD .10.92 ppg Circ, clean suction screens on both pumps. Working on MWD pump noise. Directional drill 6-3/4" hole w/ Sperrydrill motor w/ 1.76 deg bend f/ 15770'- 15889' (6524.16' TVD) (119') ART 1.14 hrs, AST .6 hrs. Total hrs on bit = 10.53 hrs.Total hrs on jars = 26.15 hrs, WOB 5-6k, 50-60 rpm's, motor rpm's 237-245, pumping 308-319 gpm, 9.2 ppg mw, on bottom pressure 3890-3970 psi, off bottom pressure 3680-3840 psi, on bottom torque 8-9k ft/Ib, off bottom torque 6-7k ft/Ib, PU wt 205k, SO wt 125 k, Rot wt 150 k. ECD 10.8-10.92 ppg Circ 9.2 ppg MW @ 320 gpm w/ 3970 psi (10.8 ppg EMW), losing 60 bph. Circ @ 260 gpm w/ 2950 psi, losses stabilizing. Mixing 80 bbl LCM pill : 10 ppb safe carb 10, 10ppb safe carb 40, 20ppb, dyna red fine. j Note: total losses to 1800 hrs = 192.5 bbls Pump 60 bbls LCM pill @ reduced rate while conducting Safety stand down w! CPAI Team leader Randy Thomas, CPAI drilling Safety 'Specialist Mike Rodriguez, Doyon safety director Mike Peters, Doyon Drilling Operations Manager Todd Driskill, and Doyon Rig 15 drilling Team. :Monitor well, static. Allow LCM pill to soak. ~ POOH slowly f/ 15889' to 14747'. No problems Printed: 12/30/2005 9:34:03 AM • GonocoPhillips Alaska Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date 11 /2/2005 11 /3/2005 'Subs Start: 9/11 /2005 Rig Release: 11/17/2005 Rig Number: 15 Page 35 of 44 Spud Date: 7/30/2005 End: Group: From - To 'Hours Code ,Code ~' Phase Description of Operations 21:30 - 22:30 ~ 1.00 ~ RIGMNT RSRV ~ PROD !Service rig and top drive. 22:30 - 00:00 ~ 1.501 RIGMNT RSRV PROD ,Hang blocks. Slip and cut 64' of drilling line. Monitoring well. 00:00 - 00:30 0.50 00:30 - 01:30 ~ 1.00 01:30 - 01:45 ' . 0.25 01:45 - 02:00 0.25 02:00 - 03:00 ~, 1.00 03:00 - 03:15 ' 0.25 03:15 - 04:00 0.75 04:00 - 04:15 0.25 RIGMNTI RSRV DRILL (CIRC PROD PROD DRILL 'CIRC PROD DRILL CIRC PROD DRILL CIRC PROD DRILL CIRC 'PROD DRILL CIRC ~ PROD DRILL ;TRIP PROD 04:15 - 04:30 0.25 DRILL OTHR PROD 04:30 - 05:00 i 0.50 ~ DRILL TRIP PROD 05:00 - 06:00 ~ 1.00 ~ DRILL , OTHR ~ PROD 06:00 - 10:15 4.251 DRILL ; OTHR PROD 10:15 - 10:30 I 0.251 DRILL TRIP i PROD 10:30 - 11:30 I 1.001 DRILL DRLH 'PROD 11:30 - 12:00 '; 0.501 DRILL I OTHR PROD 12:00 - 12:45 I 0.751 DRILL I CIRC 'PROD 12:45 - 15:00 2.25 DRILL !TRIP PROD 15:00 - 15:30 0.50 DRILL ~ CIRC I PROD 15:30 - 16:00 ' 0.50! DRILL TRIP I PROD Total fluid lost this tour (1800-midnight= 32.5 bbls Total fluid lost today 225 bbls Total losses to well = 225 bbls Hang blocks. Slip and cut 64' of drilling line. Monitoring well. MU top drive. Circ w/ working pipe f/ 14790' to 14841', 30 rpm, while monitoring losses. Staging pumps up to 2.5 bpm w/ 1100 psi Circ w! working pipe f/ 14790' to 14841', 30 rpm, while monitoring losses. Staging pumps up to 4 bpm w/ 1520 psi Circ w/ working pipe f/ 14790' to 14841', 30 rpm, while monitoring losses. Staging pumps up to 5 bpm w/ 1860-1900 psi. ECD's 10.4-10.6 ppg. No losses apparent. Circ w1 working pipe f/ 14790' to 14841', 30 rpm, while monitoring losses. Staging pumps up to 6 bpm (70 spm) w/ 2600 psi. ECD's 10.52 ppg. No losses apparent. Circ w/ working pipe f/ 14790' to 14841', 30 rpm, while monitoring losses. Staging pumps up to 7 bpm (82 spm) w/ 3308-3350 psi, 33-34% flow. ECD's 10.6 ppg. No flosses apparent. Circ w/ working pipe f/ 14790' to 14841', 30 rpm, while monitoring losses. Staging pumps up to 8 bpm (93 spm) w/ 3860-3960 psi, 34% flow. ECD's 10.63-10.84 ppg. No losses apparent. Trip in hole f/ 14841' to 15113'. Taking weight @ open hole sidetrack point. PU/ MU top drive, orient to low side. Slide through 15113' to 15121'. Trip in hole f/ 15121' to 15852'. MU top drive. Madd pass f! 15852' to 15823'. Pulling speed 29' per hour. Rotating 30 rpm, torque 7-8k ft Ib pumping @ 76 spm (273 gpm) w/ 3100 rpm, 10.6ppg. Equiv Circ density. Total fluid lost this tour(0000- 0600 hrs) is 66 bbls Total losses to well = 291 bbls Madd pass f/ 15823' to 15690'. Pulling speed 29' per hour. Rotating 30 rpm, torque 7-8k ft Ib pumping @ 76 spm (273 gpm) w/ 33040 rpm, 10.6ppg. Equiv Circ density. Trip in hole f/ 15690' to 15899'. Directional drill 6-3/4" hole w/ Sperrydrill motor w/ 1.76 deg bend f/ 15899'- 15917' (6527' TVD) (28') ART .74 hrs, AST 0.0 hrs. Total hrs on bit = 11.27 hrs. Total hrs on jars = 26.89 hrs, WOB 5-6k, 50-60 rpm's, motor rpm's 237-245, pumping 308-319 gpm, 9.2 ppg mw, on bottom pressure 3890-3970 psi, off bottom pressure 3680-3840 psi, on bottom torque 8-9k ft/Ib, off bottom torque 6-7k ft/Ib, PU wt 205k, SO wt 125 k, Rot wt 150 k. ECD 10.8-10.92 ppg Madd pass f/ 15917' to 15895'. Pulling speed 29' per hour. Rotating 30 rpm, torque 8-9k ft Ib pumping @ 76 spm (270 gpm) w/ 3040 rpm, 10.6ppg. Equiv circ density. Pump 50 bbls of 40 ppb LCM pill, spot this pill in open hole f/ shoe to 15895' w/ bit pulled out of hole to shoe. POOH f/ 15895' to 14790'. 7-5/8" shoe @ 14780'. Circ w/ working pipe f/ 14790' to 14841', 30 rpm, while monitoring losses. Staging pumps up to 8.33 bpm(350 gpm) (97 spm) w/ 4230 psi, 34% flow. ECD's 10.82 ppg. No losses apparent. Trip in hole f/ 14841' to 15916'. Survey check shot @ 15183'. No Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Page 36 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date 11/3/2005 "From - To Hours - - ___ 15:30 - 16:00 ~ 0.50 16:00 - 18:00 ~ 2.00 18:00-19:15' 1.25 19:15 - 19:30 0.25 19:30 - 19:45 f 0.25 19:45 - 21:00 ; 1.25 21:00 - 21:45 0.75 21:45 - 22:15 0.50 22:15 - 00:00 1.75 Code ' Code i Phase DRILL TRIP PROD DRILL ;DRLH ,PROD DRILL I CIRC I PROD DRILL DRLH PROD i DRILL i CIRC I PROD DRILL (TRIP PROD DRILL OBSV I PROD DRILL CIRC PROD DRILL TRIP I PROD 11/4/2005 00:00 - 00:30 0.50 DRILL I SFTY I 1 00:30 - 04:15 3.75 DRILL TRIP 04:15 - 05:00 0.75 DRILL I PULD 05:00 - 05:30 0.50 DRILL TRIP 05:30 - 06:00 0.50 {DRILL OBSV 1 06:00 - 07:00 ; 1.00 DRILL ' TRIP 07:00 - 08:00 1.00 DRILL ~ OTHR 08:00 - 09:15 ~ 1.25 DRILL PULD 09:15 - 10:30 1.25 DRILL , PULD , 10:30 - 11:30 1.00 WELCTL OTHR 11:30 - 12:00 0.50 12:00 - 17:30 5.50 17:30 - 17:45 i' 0.25 OTHR BOPE PROD PROD PROD PROD PROD PROD PROD PROD PROD PROD PROD PROD OTHR I PROD Description of Operations 'problems w/trip. Directional drill 6-3/4" hole w/ Sperrydrill motor w/ 1.76 deg bend f/ ' 15917'- 15987' (6530' TVD) (72') ART .53 hrs, AST .64 hrs. Total hrs on bit = 12.44 hrs. Total hrs on jars = 27.42 hrs, WOB 5-6k, 50-60 rpm's, motor rpm's 237-245, pumping 325 gpm, 9.2 ppg mw, on bottom pressure 4030 psi, off bottom pressure 3900 psi, on bottom torque 8-9k ft/Ib, off bottom torque 8-9k ft/Ib, PU wt 215k, SO wt 130 k, Rot wt 150 k. ECD 10.7 ppg Note: total losses this tour (0600-1800 hrs)= 204 bbls Note: total losses to well @ 1800 hrs = 495 bbls Circ and condition mud and hole. MWD tools (Pulsar) not working. Directional drill 6-3/4" hole w/Sperrydrill motor w/ 1.76 deg bend f/ 15987'- 16001' (6530' TVD) (14') ART .25 hrs, AST 0.0 hrs. Total hrs on bit = 12.69 hrs. Total hrs on jars = 27.67 hrs, WOB 5-6k, 50-60 rpm's, -motor rpm's 231, pumping 300 gpm, 9.2 ppg mw, on bottom pressure 4250 psi, off bottom pressure 3500 psi, on bottom torque 10-11 k ft/Ib, off bottom torque 7-8k ft/Ib, PU wt 215k, SO wt 130 k, Rot wt 150 k. ', ECD 10.7 ppg Circulate, spot 60 bbls LCM in open hole (pill will be in Open hole after bit pulled to shoe). Pill consists of 40 ppb LCM: 8 ppb Safe Carb 10, 8 'ppb Safe Carb 40, 11 ppb Dyna Red fine, 13 bbls Dyna Red medium. MWD not detecting. POOH slowly f/ 16001' to 14747'. Calculated fill 7.4 bbls, actual 9.5 bbls. Monitor weA. Mix dry job. Well taking 6 bph. Pump 11.2 ppb dry job (59 bbls/ 62 vis). Blow down top drive. POOH f/ 14747 to 9948' Total losses 1800-2359 hrs = 67 bbls Total losses today 337 bbls Total losses f/ well @ midnight = 562 bbls to the formation Safety meeting w/ crew on accident which occured 11-3-2005 in pit room. POOH f/ 9948' to 1528' Change out elevators to 3 1/2". UD crossover, shock tool, Anderguage agitator, and crossover. Rinse out agitator. Then change out elevators back to 4". POOH f/ 1504' to BHA @ 370.63' Monitor well. Lost .7 bbl in 15 min = 2.8 bph losses. Continue POOH w/ BHA # 16 f/ 371' to 150'. Flushed motor, UD flex collar. PJSM, Remove nuke sources. UD flex drill collar. Download MWD. Continue to UD BHA # 16. Drain stack. PU test joint. Pull wear bushing. RU to test BOPE. RU to circ below test plug w/ trip tank, to trip tank, to monitor losses while testing and keep hole full. Fill stack and choke manifold w/ water. Test BOPE. Test 250 psi low and 3500 psi high f// annular, test 250 low and 4200 psi high all other compnets. Hold each test f/ 5 min, charted test. Test accumulator. Witness of test waived by AOGCC inspector Chuck Scheve Pull test plug. Install FMC wear bushing. Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Page 37 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To ' Hours Code 11/4/2005 ~ 17:45 - 19:15 1.50 WELCT 19:15 - 19:30 ~ 0.25 ~ DRILL ~ 19:30 - 22:00 '. 2.50 DRILL 22:00 - 23:00 ' 1.00 DRILL 23:00 - 00:00 1.00 . DRILL 11 /5/2005 00:00 - 00:45 0.75 i DRILL 00:45 - 01:00 0.25 DRILL 01:00 - 06:00 5.00 ~ DRILL 06:00 - 06:30 0.50 DRILL 06:30 - 10:15 3.75 DRILL 10:15 - 11:00 0.75 RIGMI 11:00 - 11:45 0.75 DRILL 11:45 - 13:15 1.50; DRILL 13:15 - 18:00 4.75 DRILL 18:00 - 00:00 11/6/2005 00:00 - 01:45 6.00 DRILL 1.751 DRILL Sub Code OTHR SFTY PULD OTHR PULD TRIP TRIP TRIP CIRC TRIP RSRV TRIP CIRC DRLH DRLH DRLH Phase Description of Operations -_ _ _ _ PROD ~ Blow down test pump. R!D floor safety valve and crossovers, pump in sub, dart valve and test joint. Clear rig floor. PROD PJSM w/ Sperry Sun MWD and directional driller on picking up BHA. PROD PU/MU BHA # 17. MU 6-3/4" FSF 2641 Sec bit, Sperry Sun geoPilot (ser # TL11), GeoPilot flex, smart stab, DM HOC, Gamma/Res, nukes, PWD, TM HOC. PROD Upload Sperry Sun MWD. PROD ; MU crossovers and shallow test MWD and GeoPilot. OK. Total losses today 84.1 bbls ,Total losses to well = 646.1 bbls Losses 0600 hrs to 1800 hrs = 5.3 bbls Losses 1800 to 2359 hrs = 2 bbls. PROD ':;Blow down top drive. MU welded blade stab, float sub, circ sub, (1) flex collar, PJSM on loading/handling nuke sources. Load sources. PROD MU (1) flex collar, (2) crossovers, Jars and (5) 4" HWDP. PROD ~ Continue trip in hole f/ 373' to 7537'. PU wt 148k, SO wt 110k, Rot wt 125k. Fill pipe every 25 stands, recording PU/SO wts every 10 stands in cased hole. Total losses to well @ 0600 hrs 656.6 bbls. PROD FiII pipe @ 7537'. Flow check. OK. PROD Trip in hole w/ BHA #17. Fill pipe every 25 stands. Record PU/SO wt's every 10 stands. PROD Service top drive and crown. PROD :,Continue trip in hole fJ 14720' to 15940'. PROD Circ bottoms up pumping 271 gpm w/ 2630 psi while working pipe f/ 15940' to 16001'. PU wt 215k, SO wt 120k, PROD ~ Directional drill 6-3/4" hole w/ Sperry Sun GeoPilot 5200 (ser # TL11) f/ 16001'- 16245' (6560' TVD) (244') ART 3.43 hrs. Total hrs on bit = 3.43 ~ hrs.Total hrs on jars = 31.09 hrs, WOB 5-10k, 90 rpm's, pumping ~ 270-300 gpm, 9.2-9.1 ppg mw, on bottom pressure 2610-2850 psi, off bottom pressure 2475- 2850 psi, on bottom torque 10-11 k ft/Ib, off .bottom torque 8-9k ft!{b, PU wt 215k, SO wt 125 k, Rot wt 153 k. ECD 10.88 PP9 PROD Directional drill 6-3/4" hole w/ Sperry Sun GeoPilot 5200 (ser # TL11) f/ 16245'- 16591' (6575' TVD) (346') ART 4.29 hrs. Total hrs on bit = 7.72 hrs.Total hrs on jars = 35.38 hrs, WOB 8-10k, 90 rpm's, pumping 1270-300 gpm, 9.2-9.1 ppg mw, on bottom pressure 2610-3020 psi, off 'bottom pressure 2630- 3010 psi, on bottom torque 10-11 k ft/Ib, off bottom torque 10k ft/Ib, PU wt 205k, SO wt 122 k, Rot wt 152 k. ECD .11.17 ppg PROD Note: Total fluid losses f/ well @ midnight = 1383.6 bbls. Fluid lost today = 737.5 bbls Mud losses while drilling approx 60 bph. Pumped (4) 20 bbl LCM sweeps (25 ppb total, 15 ppb dyna red med + 10 ppb safecarb 250) @ 16,055', 16156', 16295', and 16424'. Directional drill 6-3/4" hole w/ Sperry Sun GeoPilot 5200 (ser # TL11) f/ 16591'- 16684' (6575' TVD) (93') ART 1.09 hrs. Total hrs on bit = 8.8 hrs.Total hrs on jars = 36.47 hrs, WOB 8-10k, 90 rpm's, pumping 270-295 gpm, 9.2 ppg mw, on bottom pressure 2640-2730 psi, off bottom pressure 2630- 2710 psi, on bottom torque 11-12k ftllb, off bottom torque 10-11 k ftllb, PU wt 205k, SO wt 120 k, Rot wt 151 k. Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Page 38 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To , Hours Code ! Code Phase 11 /6/2005 ~ 00:00 - 01:45 1.75 ~ DRILL DRLH ;PROD ..01:45 - 02:00 0.25 DRILL CIRC PROD 02:00 - 03:30. 1.50. DRILL !.CIRC i PROD 03:30 - 05:30 ~ 2.00 05:30 - 06:00 0.50 06:00 - 07:30 . 1.50 DRILL 'WIPR I PROD RIGMNT RSRV ,PROD DRILL .CIRC (PROD 07:30 - 08:45 1.25 08:45 - 12:00 I 3.25 12:00 - 18:00 ! 6.00 18:00 - 00:00 ! 6.00 DRILL ~ WIPR I PROD DRILL DRLG PROD DRILL DRLG PROD DRILL DRLG i PROD Spud Dater 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations ECD 11.46 ppg Losses @ 60 BPH Circulate to condition hole for trip to shoe to treat losses. SPR Circulate and spot 70 LCM pill in open hole. 70 bbl pill = 15ppb Dyna red fine, 10 ppb Dyna red med, 10 ppb Safe Garb 250. POOH slowly from 16,594' to 14747' Fill calculated 10.83bb1's !! Actual 10.0 bbl's Service top drive Circulate at casing shoe to allow EDC pressure to squeeze away LCM pill in open hole. Loosing 20 - 25 bph while circulating. 1.2 - 1.5 bph static loss. Hole volume from casing shoe to loss depth@ 15889' = 47 bbls Trip slowly into hole and ream last 90 feet to bottom with no problem or tight spots. Losses = 60 bph while circulating Directional drill 6-3/4" hole w! Sperry Sun GeoPilot 5200 (ser # TL11) f/ 16684' to 16870'(6575' TVD) (186') ART 2.1 hrs. Total hrs on bit = 10.9 hrs.Total hrs on jars = 36.67 hrs, WOB 8-10k, 90 rpm's, pumping 270-250 gpm, 9.2 ppg mw, on bottom pressure 2540-2630 psi, off bottom pressure 2530- 2550 psi, on bottom torque 11-12k ft/Ib, off bottom torque 8-12k ft/Ib, PU wt 210k, SO wt 115 k, Rot wt 153 k. ECD 11.07 ppg.. Slowed pumps to 256 gpm reduced losses from 60 bph to 30 bph. Directional drill 6-3/4" hole f/ 16870' to 17243'(6576' TVD) (373') ART 3.96 hrs. Total hrs on bit = 14.86 hrs.Total hrs on jars = 42.53 hrs, WOB 8-10k, 90 rpm's, pumping 270-250 gpm, 9.3 ppg mw, on bottom pressure 2780-2700 psi, off bottom pressure 2630- 2710 psi, on bottom torque 11-12k fUlb, off bottom torque 10-12k ft/Ib, PU wt 205k, SO wt 120 k, Rot wt 152 k. ECD 11.46 ppg. Losses @ 30-50 bph. Directional drill 6-3/4" hole f 17243' to 17560' (6564' TVD) (317') ART 4.3 hrs. Total hrs on bit = 19.16 hrs.Total hrs on jars = 46.83 hrs, WOB 8-10k, 90 - 100 rpm's, pumping 270-250 gpm, 9.3 ppg mw, on bottom pressure 2900 psi, off bottom pressure 2850 psi, on bottom torque 11-12k ft/Ib, off bottom torque 10-12k ft/Ib, PU wt 200 k, SO wt 115 k, Rot wt 150 k. ECD 11.49 ppg. Losses @ 30 - 50 bph. Note: Total fluid losses f/ well @ midnight = 2172 bbls. Fluid lost today = 788 bbls Mud losses while drilling approx 30 - 50 bph. With reduced pump rate @ 260 gpm Pumped (5) 20 bbl LCM sweeps (25 ppb total, 15 ppb dyna red med + 10 ppb safecarb 250) @ 16,928', 17195', 16295', 17,330' and 17414'. Weight Up at 16880 @ 12:30 to 9.3ppg Note: Total fluid losses to well @ midnight = 3171 bbls. Fluid lost past 24 hours = 999 bbls Mud losses while drilling approx 30 - 40 bph with reduced pump rate @ 260 gpm Note: Total fluid losses to well @ midnight = 3171 bbls. Fluid lost past 24 hours = 999 bbls Mud losses while drilling approx 30 - 40 bph with reduced pump rate @ 260 gpm Printed: 12/30/2005 9:34:03 AM • 1 C-28 1 C-28 ROT -DRILLING D15CM@conocophillips.com Doyon 15 Hours "Code 'Code II Pha '~-~ Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date... .From - To 11/6/2005 18:00 - 00:00 11 /7/2005 00:00 - 06:00 i i '.06:00 - 12:00 i 12:00 - 18:00 18:00 - 00:00 i i I i i I 11/8/2005 00:00 - 06:00 106:00 - 10:15 10:15 - 14:30 14:30 -14:45 6.001 DRILL DRLG PROD 6.00 DRILL ~, DRLH i i 6.00 DRILL DRLH PROD PROD 6.00 ~ DRILL I DRLH I PROD 6.00 DRILL DRLH PROD 6.001 DRILL ;DRLH PROD 4.25 DRILL ~I ~i 4.25 ~~ DRILL ConocoPhillips Alaska DRLH PROD CIRC PROD 0.251 DRILL I OBSV I PROD Start: 9/11 /2005 Rig Release: 11/17/2005 Rig Number: 15 Page 39 of 44 Spud Date: 7/30/2005 End: Group: e I Description of Operations _- ------ Directional drill 6-3/4" hole with Geo-pilot f !17560' to 17923(6565' TVD) (363') ART 4.06 hrs. Total hrs on bit = 23.22 hrs.Total hrs on jars = 50.89 hrs, WOB 8-10k, 90 - 100 rpm's, pumping 260 gpm, 9.4 ppg mw, on bottom pressure 2790 psi, off bottom pressure 2750 psi, on bottom torque 11-12k ftllb, off bottom torque 10-11 k ftilb, PU wt 200 k, SO wt 110 k, Rot wt 150 k. ECD 11.48 ppg. Losses @ 30 - 60 bph. Continue to Directional drill 6-3/4" hole with Geo-pilot f / 17,923 to 18,315(6563' TVD) (392') ART 4.22 hrs. Total hrs on bit = 27.44 hrs.Total hrs on jars = 55.11 hrs, WOB 8-10k, 100-110 rpm's, pumping 260 gpm, 9.4 ppg mw, on bottom pressure 2950 psi, off bottom pressure 2930 psi, on bottom torque 12-13k ft/Ib, off bottom torque 11-12k ft/Ib, PU wt 215 k, SO wt 110 k, Rot wt 150 k. ECD 11.48 ppg. Losses @ 30 - 60 bph. Continue to Directional drill 6-3/4" hole with Geo-pilot f / 18,315to 18645'(6565' TVD) (330') ART 4.12 hrs. Total hrs on bit = 31.56 hrs.Total hrs on jars = 59.23 hrs, WOB 8-10k, 100-110 rpm's, pumping 268 gpm, 9.4 ppg mw, on bottom pressure 3080 psi, off bottom pressure 3060 psi, on bottom torque 13k ft/Ib, off bottom torque 11-12k fUlb, PU wt 210 k, SO wt 110 k, Rot wt 146 k. ECD 11.48 ppg. Losses @ 30 - 50 bph. Pumping 20 bbl LCM sweeps every 2 hours with 15 ppb mix2 fine, 10 ppb mix2 med, & 10 ppb safe carb 250 Continue to Directional drill 6-3/4" hole with Geo-pilot f / 18645' to 18, 943(6565 to 6563' TVD) (298') ART 3.69 hrs. Total hrs on bit = 35.25 hrs. Total hrs on jars = 62.06 hrs, WOB 8-10k, 100-110 rpm's, pumping 268 gpm, 9.4 ppg mw, on bottom pressure 3060 psi, off bottom pressure 3010 psi, on bottom torque 12-13k fUlb, off bottom torque 11-12k ft/ib, PU wt 210 k, SO wt 110 k, Rot wt 145 k. ECD 11.48 ppg. Losses @ 30 - 60 bph. 62 units maximum gas Pumping 20 bbl sweeps every 2 hours with 15 ppb Mix2 fine, 10 ppb Mix2 med & 10 ppb Safe-carb 250. Continue to Directional drill 6-3/4" hole with Geo-pilot f / 18, 943 to 19278' 6565'TVD (344') ART 4.47 hrs. Total hrs on bit = 39.72 hrs. Total hrs on jars = 66.63 hrs, WOB 8-12k, 100-110 rpm's, pumping 268 gpm, 9.5 ppg mw, on bottom pressure 3090 psi, off bottom pressure 3080 psi, on bottom torque 13k fUlb, off bottom torque 12k fUlb, PU wt 220 k, SO wt 105 k, Rot wt 145 k. ECD 11.48 ppg. Losses @ 30 - 45 bph. 62 units maximum gas Pumping 20 bbl sweeps every 2 hours with 15 ppb Mix2 fine, 10 ppb Mix2 med & 10 ppb Safe-carb 250. Continue to Directional drill 6-3/4" hole with Geo-pilot f / 19278' to 19,367' MD 6559'TVD (89') ART 3.40 hrs. Total hrs on bit = 43.12 hrs. Total hrs on jars = 69.93 hrs, WOB 8-12k, 120 rpm's, pumping 268 gpm, 9.5 ppg mw, on bottom pressure 3130 psi, off bottom pressure 3030 psi, on bottom torque 13k ft/Ib, off bottom torque 12k fUlb, PU wt 215 k, SO wt 105 k, Rot wt 145 k. ECD 11.6 ppg. Losses @ 30 - 45 bph. 62 units maximum gas. Circulate and condition 265 gpm = 3050 psi. MW = 9.5 ppg. Stand one stand back ea hour. Rotate pipe at 100 - 110 rpm Reciprocate while circulating. Loosing 15 BPH average while circulating Monitor well before tripping. Static with out pumping. Printed: 12!30/2005 9:34:03 AM • Legal Well Name: 1 C-28 Common Well Name: 1 C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To ,Hours Code I Code I Phase 11/8/2005 114:45 - 22:15 ~ 7.50 ~ DRILL I REAM PROD 22:15 - 00:00 1.75 DRILL CIRC I PROD 11!9/2005 00:00 - 00:30 ~ i 0.501 DR1LL 00:30 - 02:30 i 2.00 RIGMNT 02:30 - 03:00 ~ 0.50 ~ DRILL 03:00 - 06:00 3.00 DRILL 06 00 12 00 6 00 DRILL : - : . 12:00 - 12:30 I 0.50 ~ DRILL 12:30 - 18:00 I 5.501 DRILL TRIP PROD I 18:00 - 19:30 1.50 DRILL ~ TRIP ~ PROD 19:30 - 22:30 3.00 DRILL 22:30 - 23:30 1.00'' DRILL 23:30 - 00:00 j 0.50 ~ DRILL 11/10/2005 00:00 - 01:00 ~ 1.00 DRILL 01:00 - 01:30. 0.50, DRILL 01:30 - 01:45 0.2511 DRILL 01:45 - 05:15 ~ 3.50 ! DRILL ConocoPhillips Alaska Operations Summary Report Page 40 of 44 Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations Circulate and back ream out of hole to shoe/ 110 rpm 270 gpm = 2780 psi. ECD's = 11.34 ppg Loosing 10 - 30 bph while back reaming. No tight hole seen. Circulate and condition at casing shoe. Pumping at 300 gpm 3100 psi rotating 110 rpm. Shakers cleaned up in one bottoms up. Loosing 20 - 30 bph to well while circulating Total fluid lost to well 3787 bbls Total fluid lost past 24 hours 616 bbls Monitor well at casing shoe. Slight breathing for 5 minutes reduced to static with no losses. 1 bbls back and static. Slip and cut103' drill line. Pumping at 20 spm 780 psi while doing rig service. Lost 14 bbls to well in 2.5 hours. Monitor well fro 30 minutes /Static. Trip inhole F/14871 to 19,209' Wash and ream from 19,209 to 19367' 270 gpm = 2100 psi Circulate and condition mud @ 267 gpm = 3030 psi. PU wt 215 k, SO wt 115 k, Rot wt 145 k. ECD 11.6 ppg. Losses @ 30 - 45 bph. 110 rpm 11 K ft/# torque. Stand back 1 stand per hour F/ 19367 to 18930' Circulate and prepare for trip. Circulate and condition mud @ 267 gpm = 3030 psi. PU wt 215 k, SO wt 115 k, Rot wt 145 k. ECD 11.6 ppg. Losses @ 30 - 45 bph. 110 rpm 11 K ft/# torque. Pump out of holeF/ 18368 to 15567. tried to pull on elevators but began to swab. Continue to pull out (pumping) of hole F/ 15567 to 14781 @ casing shoe. 267 gpm 2680 psi P/U weight = 210k# // S/O weight = 120K# No over pull through sidetrack 15115' or loss section @ 15889' Circulate LCM sweep to clean up well bore @ 300 gpm = 3050 psi. Rotate @ 100 RPM Monitor well for losses /gains. Breathing bach 4 bbls 30 minutes and stopped. Monitored 30 additional minutes with no losses or gains. Circulate EP mud sweep @ 300 gpm 3050 & 100 RPM Lost 411 bbl's in last 24 hours for total loss to wel of 4198 bb's Continue to circulate EP mud tube pill. 300 gpm = 3050 psi Monitor well fro well control. Breathing back 4 bbls in 30 minutes and static after / no gain no loss after 30 minutes. Pump dry job and blow down top drive. Trip out of hole From 14871 to 8865' Lotads are worn and damaged 36 stands with Lotads out, most showing wear. 3 Lotads laid down out of 36 2 x broken open but all parts intact. Hole taking correct fill while tripping out. OBSV PROD RSRV 'PROD OBSV !PROD WIPR (PROD CIRC PROD I CIRC ,'PROD CIRC ' PROD OBSV 'PROD CIRC ~ PROD CIRC iPROD OBSV ,PROD TRIP .PROD TRIP '.PROD Printed: 12/30/2005 9:34:03 AM ConocoPhillips Alaska Page 41 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date 11 /10/2005 From - To ' Hours Code Phase ' Description of Operations Code 05:15 - 09:30 4.25 RIGMNT~ RGRP PROD Repair drawwork /traction motor drive chain after breaking. Hold prejob safety meeting and repair. 09:30 - 10:00 0.50 . DRILL TRIP PROD ~ POOH from 8865 to 7635' watching string carefully for increased drag ' and / or missing lotad pieces on string. I ' NPT time is taken while tripping and taking extra time to attempt to locate lost Lotad body. 10:00 - 10:30 0.50 DRILL TRIP PROD Drain stack and look for lotad body on BOP. Nothing could be seen. 10:30 - 16:00 ~, 5.501 DRILL TRIP PROD 'i POH to HWDP. Over pull seen at 1250' (40K#) Inspection super sliders I ~ ~ as pulled. All seamed to be in good shape. 16:00 - 16:30 ~ 0.50 DRILL TRIP PROD ' Change out elevators and monitor well. (Static) 16:30 - 17:30 1.00 DRILL ~ TRIP PROD ~ Drain stack and inspect for Lotad missing pieces. Lotad piece just below wear bushing in spool. Back out wear bushing lock downs and attempt to pull wear bushing ~ and broken LoTad with upper stab (114' above bit). j Attempt failed and dropped to lower stab. 17:30 - 18:00 ~ 0.50 ~ DRILL TRIP 'PROD ' Clear rig floor and unload nukes. 18:00 - 19:00 1.00 DRILL TRIP PROD ~ Tighten down lock downs on wear bushing and pull lower stab and broken lotad body in to wear bushing. Release lock down and pull wear bushing to rig floor. 1/2 of lotad body lodged on top stab under wear bushing. ; second 1/2 seen laying on top 7 5/8" casing hanger. 19:00 - 19:30 0.501 DRILL PULD ;PROD Lay down MWD equipment to allow handing fishing tools. Order out magnetic. 19:30 - 22:00 2.50 FISH 22:00 - 22:45 ~ I 0.75 ~ FISH 22:45 - 23:30 0.75 FISH 23:30 - 00:00 I 0.50 i 11/11/2005 00:00 - 00:30 I 0.50 00:30 - 01:00 j 0.50 01:00 - 01:45 0.75 01:45 - 06:00 4.25 06:00 - 12:30 6.50 12:30 - 14:30 2.00 FISH PROD FISH I PROD PULD PROD FISH TRIP ~ PROD FISH I TRIP PROD FISH I~ PULD PROD FISH {PULD PROD FISH ;TRIP PROD FISH TRIP ~ PROD FISH TRIP PROD 5 1/2" Magnetic arrives and checked on 1/2 lotad retrieved and was not strong enough to hold. Ordered out larger magnetic (8.5") While waiting on magnetic: broke down MWD tools and laid down in pipe shed. Make up 8.5" magnetic and attempt to retrieve lotad body at top 7 5/8" casing hanger. Failed and piece dropped into 7 5/8" casing. Lay down fishing magnetic. RIH with wear ring set. Pick up Geo pilot and nuke tools from derrick and lay down into pipe shed to be read. Ready tools and equipment to make clean out run. Lost 85 BBLS to formation in last 24 hours Total fluid lost to well 4283 bbls. Continue to lay down MWD from derrick and down load. All data good. Clear rig floor and prepare to pick up BHA Pick up mill tooth bit and BHA (BHA #18) RIH with mill tooth bit to push junk to bottom. Fill pipe every 25stands Trip in hole F/ 6125 to 14793' String taking weight. Up = 22K# DWN = 120K# Fill Pipe 270 Gpm 1930 psi Slack off 25K# down and work by obstruction. RIH F 14793 to 19114' No more obstruction seen. Fill hole every 25 stands Printed: 12/30/2005 9:34:03 AM ConocoPhillips Alaska Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 11 /11 /2005 1 C-28 1 C-28 ROT -DRILLING D15CM@conocophillips.com Doyon 15 From - To 'Hours ' Code 14:30 - 16:00 1.50 FISH 4.75 FISH 2.50 ~ FISH 0.75 FISH 16:00 - 20:45 20:45 - 23:15 i 23:15 - 00:00 11/12/2005 00:00 - 01:00 01:00 - 01:15 01:15-03:15 03:15 - 06:00 1.00 FISH 0.25 FISH 2.00 FISH 2.75, FISH i I Sub Code WASH CIRC CIRC CIRC TRIP CIRC TRIP CIRC Phase PROD PROD PROD PROD PROD PROD PROD PROD 06:00 - 07:15 ! 1.25 FISH CIRC I PROD 07:15 - 07:45 ' 0.50 FISH TRIP , PROD 07:45 - 10:30 2.75 ! FISH TRIP ~ PROD 10:30 - 11:00 0.50 ;FISH ,CIRC PROD 11:00 - 19:00 8.001 FISH ' TRIP PROD 19:00 - 20:45 1.75' FISH PULD PROD 20:45 - 21:45 1.00 ~ FISH I , PULD CMPLTN 21:45 - 23:45 ~ 2.00 CASE RURD ~ CMPLTN 23:45 - 00:00 I 0.25! CASE PULR CMPLTN 11/13/2005 !..00:00 - 04:00 04:00 - 05:15 05:15 - 06:00 06:00 - 12:30 4.00 I CASE I PULR I CMPLTN 1.25 CASE PULR I CMPLTN 0.75 CASE RUNL i CMPLTN 6.501 CASE RUNL ~ CMPLTN 3.5011 CASE RUNL CMPLTN 12:30 - 16:00 16:00 - 19:00 ; 3.00 CASE CIRC 'iCMPLTN Page 42 of 44 Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations Wash from 19114 to 19360' 1 Stand and 5 singles, 270 GPM = 2250 psi Up weight 210K#: Down weight 110K# Circulate and condition while working string. 270 GPM = 2250 psi Up weight 210K#: Down weight 110K# Circulate and monitor well. Slight breathing for 15 minutes. Static after. Pump out Lay down 1 joint HWDP, 4 jts XT 39, continue pumping out 5 stands to 18927' Daily losses for 11/11 = 174 bbl's Total losses to well 4457 bbls Pull out of hole on Elevators monitoring losses. Hole not swabing. No over pull. Pump 20 bbls dry job. Pulled to shoe on elevators slowly with out pumping out. No swabing or over pull. Circulate at shoe at 320 GPM / 100 rpm Hole started to take 40 - 60 BPH Reduced pump rate to 260 gpm and losses reduced to 20 - 25 bph. Circulate pill EP mud tube and take to rock washer. Monitor well 30 minutes. Static POH well slowly watch for correct fill and loss. Pump dry job and blow down top drive. POH from 12320 to 2170' SLM inspecting lotads and super sliders and arranging in derrick to run liner. Lay down accelerators and jars. drift pipe as pulled. Rabbit not dropping very well. i Lay HWDP and BHA. ~ Clear rig floor and prepare to run liner. Make break on MWD tools and lay down. MWD tools were not in string. Picked up from pipe shed broke and laid down. PJSM to run liner and prepare tools and services. Pick up and run slotted and blank liner. Ran 10 joints. Total fluid loss to well in past 24 hours = 186 bbls Total fluid lost to well 4863 bbls Run liner to liner hanger. Well taking about 3-5 bph average. Pick up liner hanger as per Baker Running liner on drill pipe. Filling every 25 stands. Run liner to casing shoe. Establish rotating, slack off and pickup weights. Pickup weight = 180K ;Slack off weight 120k Rotate @ 35 RPM = 8000 ft# torque Run liner into open hole taking up and down weights every 5 stands. Set down 40K @ 18650' and work through with no trouble. Drop Baker setting 1 1/2' balland pump down at 11 spm 780 psi for 1832 strokes. Printed: 12/30/2005 9:34:03 AM n Its ConocoPhillips Alaska Page 43 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common W ell Name: 1 C-28 Spud Date: 7/30/2005 Event Nam e: ROT -D RILLING Start: 9/11/2005 End: Contractor Name: D15CM @conoco phillip s.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 1 5 Rig Number: 15 Date ', From - To ~i Hours Code '' ' Phase Description of Operations ; Code 11/13/2005 19:00 - 19:30 0.50 CASE ;CIRC CMPLTN Pressure up to 1300 psi and set liner hanger. Slack off 50K down and verify set. Pressure up to 4000 psi and set packer. Bleed psi to 0. 19:30 - 20:00 0.50 ~ CASE MIT CMPLTN ,Pressure up annulus to 1500 psi and test liner packer for 15 minutes. i ~ I Holding. ~, 20:00 - 21:45 ~ ! 1.75 ~ I CASE CIRC CMPLTN ~ Circulate bottoms up for well control. at 300 GPM 1870 psi. ~ 21:45 - 22:00 0.25 CASE DEOT CMPLTN Monitor well /static. ' 22:00 - 22:30 ; 0.50 CASE ~ CIRC CMPLTN Pump dry job and prepare to POH with drill pipe. Blow down top drive. 22:30 - 00:00 i 1.50 CASE ;RUNL CMPLTN Pull out of hole with 4" drill pipe and lay down lotads and black band I pipe for inspection. Daily fluid lost to well = 94 bbls Total fluid lost to well 4977 bbls 11/14/2005 00:00 - 09:15 9.25 CASE RUNL '; CMPLTN POH with 4" drill pipe after setting liner. Lay down LoTads and Black XT I 39 band drill pipe for inspection 150 jts and 47 lotads. 09:15 - 11:15 2.00 CASE RUNL ' CMPLTN POH with drill pipe and stand back in derrick. 11:15 - 12:00 0.75 CASE RURD CMPLTN Lay down Baker running tools. 12:00 - 12:30 0.50 CMPLTN PULD CMPLTN Clear rig floor and prepare to run completion string. 12:30 - 14:15 1.75 ; CMPLTN RURD CMPLTN ' Hold PJSM to pick up completion tools and string. Pick ip tubing ~ ; equipment.. Pull Wear ring. 14:15 - 18:00 ~ 3.75 CMPLTN RUNT CMPLTN ' Run completion string 4 1/2" 12.6 #/ft L-80 IBT Modified as per program fro 0' to 3800'. 18:00 - 00:00 ~ 6.00 CMPLTN RUNT II CMPLTN Run completion string f/ 3800' to 11600' 11/15/2005 00:00 - 02:30 2.50 CMPLTN RUNT , CMPLTN RIH with 4 1/2" tuning to 14576' Tubing string set down and could not enter tie back sleeve. 10,000# set down /work string. No entry. 02:30 - 03:30 1.00 i !CMPLTN RUNT IC CMPLTN ,Attempt to pressure up back side to varify hook up into tie-back. I ~'i Will not test. ',Break circulation long way. ~ I i Confirm not in tie back. ' I 03:30 - 05:00 ! 1.50 CMPLTN ~ RUNT CMPLTN ~ f Turn string 180 degrees and work into top of liner top with completion string. Run joints # 473 and 474 tag up 28' in on joint#474 Pressure up back side to 500 psi and verify entry. ~ No Go at 14600' On depth. 05:00 - 05:45 0.75 CMPLTN SOHO CMPLTN Lay down joints # 474 & 473. Space out. Pick up on 472 and put 2 x pups blow ~ Lengths 5.80' & 2.0T Below joint 472 Pick up liner hanger and landing joint. i 05:45 - 06:45 1.00 j CMPLTN RURD CMPLTN ! Clean rig floor. Lay down casing /completion running tools. Hold Pre-job safety meeting with crew and truck driver for displacement. 06:45 - 09:00 !, 2.25 CMPLTN, CIRC I CMPLTN Displace well over to 9.5 PPg brine @ 7 bpm 730 psi ' ~I Pump total 650 bbls brine Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska' Page. 44 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1 C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours Code Sub i Phase ~ Description of Operations '...Code 11/15/2005 109:00 - 10:15 1.25 j CMPLTN CIRC j CMPLTN ~ Pump 322 bbls corrosion inhibitor @ 7 bpm 600 psi. 10:15 - 11:00 11:00 - 11:30 11 /16/2005 11 /17/2005 11:30 - 11:45 11:45 - 12:15 12:15 - 12:30 12:30 - 12:45 12:45 - 00:00 00:00 - 02:00 02:00 - 09:15 09:15 - 11:00 11:00 - 15:15 0.75' CMPLTN CIRC CMPLTN Chase corrosion inhibitor with 222 bbls brine @ 7 bpm 600 psi 0.50 CMPLTN SOHO CMPLTN ~i Sting into SSE landing hanger. 'Lay down landing joint Pick up weight = 170,000# i ~ ,Slack off weight 115,000# 0.25 j CMPLTN] DEQT I CMPLTN 0.50' CMPLTN RURD CMPLTN 025 CMPLTN NUND CMPLTN 0.25; CMPLTNI PULL I CMPLTN 11.25! CMPLTNI PULL CMPLTN 2.00' CMPLTN' PULL CMPLTN 7.25 CMPLTN PULL CMPLTN 1.75! RIGMNT RSRV CMPLTN 4.25 ~ RIGMNT RSRV :CMPLTN 15:15 - 21:00 ! 5.75 i CMPLTNI NUND I CMPLTN 21:00 - 21:45 ! 0.75' CMPLTN NUND CMPLTN 21:45 - 23:30 1.75 CMPLTN; NUND CMPLTN 23:30 - 00:00 00:00 - 02:00 02:00 - 02:30 02:30 - 03:00 03:00 - 03:30 03:30 - 04:00 04:00 - 05:00 05:00 - 06:00 06:00 - 08:30 08:30 - 09:00 09:00 - 12:00 0.50 CMPLTN' SEOT 'CMPLTN 2.00 CMPLTN SEOT CMPLTN 0.50 CMPLTN' SEAT CMPLTN 0.50 CMPLTN SEOT CMPLTN 0.50 CMPLTNI SEOT I CMPLTN Test 4 1/2" tubing X 7 5/8" casing to 1000 psi for 5 minutes to verify seated 'into tie back. Good test. Lay down landing joint and blow down top drive. Set BPV with FMC. Rig up 4" elevators to lay down drill pipe and remove super sliders. Inspect pipe visually where SS were. Lay down 4" drill pipe from derrick and remove super slider. Marking bottom of super slider so they can be flopped over and re-ran. Number as to position in string to evaluation of condition by Security DBS. Total fluid lost to well past 24 hours = 12 bbls Total fluid lost to well 5055 bbls Continue to lay down 4" drill pipe in mouse hole with super sliders Continue to lay down 4" drill pipe from derrick Slip and cut drilling, Service brakes on drawworks. Change out top pipe rams to 4.5 X 7" Clean out drip pan under rig floor. Change out saver sub to 4 1/2" IF. Change out liners on pumps to 6". Blow down choke and kill lines. Nipple down BOP. Also continue to change out liners on mud pumps. Continue to nipple down BOP removing riser and well head. Nipple up tree. Test void to 5000 psi. Good test. • Rig up drill site maintenance with lubricator to pull BPV. Rig up lubricator with Drill site maintenance. Test tree to 5000 psi good test. Pull TWC with drill site maintenance and lubricator Perform MITIA to 7 5/8" casing & 4 1/2' tubing to 2500 psi. Brought pressure up slowly to 2500 psi. RP valve sheared at 2400 psi 0.50' CMPLTNI FRZP ~ CMPLTN Freeze protect well with 83 bbls diesel pumped down back side between 7 5/8" csg & 4 1/2" tubing. 1.00 CMPLTN 1.00 CMPLTN FRZP : NUND CMPLTN U tube well to tubing. CMPLTN ,Rig down U tube manifold and lines. 2.50 CMPLTN SFTY ; CMPLTN Waiting on drill site maintenance to set BPV. 'Wells group safety mgr. came to inspect operation before valve shop 0.50 CMPLTN NUND could continue and set BPV with lunicator. CMPLTN Set BPV and secure tree. 3.00 j CMPLTN: FRZP ; CMPLTN Secure well and relaease rig at 12:00 (noon) Printed: 12/30/2005 9:34:03 AM Halliburton Sperry-Sun Western North Slope ConocoPhillips Kuparuk 1 C 1 C-28 Job No. AK ZZ-0003922104, Surveyed: 8 November, 2005 Survey Report 8 December, 2005 Your Ref: API 500292327000 . Surface Coordinates: 5968689.43 N, 562121.21 E (70° 19' 29.9481 " N, 149° 29' 46.5750" Ylq Grid Coordinate System: NAD27A/aska State Planes, Zone 4 Surtace Coordinates relative to Project H Reference: 968689.43 N, 62121.21E (Grid) Surtace Coordinates relative to Stucture Reference: 169.04 N, 249.45 W (True) Kelly Bushing Elevation: 100.90ft above Mean Sea Level Kelly Bushing Elevation: 100.90ft above Project V Reference Kelly Bushing Elevation: 100.90ft above Structure Reference ~ Survey Ref: svy2248 R t#aN6trurtaa Gompy Ha/liburton Sperry-Sun Survey Report for Kuparuk 1 C -1C-28 Your Ref: API 500292327000 Job No. AK-ZZ-0003922104, Surveyed: 8 November, 2005 Western North Slope ConocoPhillips Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 15059.07 88.850 106.930 6419.62 6520.52 4056.10 S 11966.09E 5964732.53 N 574120.47E 12001.03 Tie-On Point 15113.96 89.080 108.840 6420.61 6521.51 4072.95 S 12018.31E 5964716.11 N 574172.83E 3.504 12053.40 15141.15 88.470 106.060 6421.19 6522.09 4081.10 S 12044.24E 5964708.17 N 574198.83E 10.465 12079.40 15188.54 89.090 107.280 6422.20 6523.10 4094.69 S 12089.63E 5964694.96 N 574244.32E 2.887 12124.90 15234.77 89.140 104.760 6422.92 6523.82 4107.45 S 12134.06E 5964682.57 N 574288.85E 5.451 12169.44 15282.65 90.070 104.160 6423.25 6524.15 4119.40 S 12180.42E 5964671.00 N 574335.31E 2.311 12215.90 15382.01 91.000 101.660 6422.32 6523.22 4141.60 S 12277.25E 5964649.61 N 574432.33E 2.684 12312.93 15421.45 89.460 100.430 6422.16 6523.06 4149.16 S 12315.96E 5964642.37 N 574471.10E 4.997 12351.70 15511.73 87.190 96.720 6424.80 6525.70 4162.61 S 12405.17E 5964629.66 N 574560.42E 4.816 12441.02 15606.92 90.690 92.430 6426.56 6527.46 4170.20 S 12500.01E 5964622.86 N 574655.31E 5.815 12535.92 15651.42 90.940 92.740 6425.93 6526.83 4172.20 S 12544.46E 5964621.22 N 574699.77E 0.895 12580.39 15700.20 90.870 92.380 6425.16 6526.06 4174.38 S 12593.18E 5964619.44 N 574748.52E 0.752 12629.13 15790.61 89.040 91.820 6425.23 6526.13 4177.69 S 12683.53E 5964616.88 N 574838.89E 2.117 12719.50 15886.68 88.160 91.220 6427.58 6528.48 4180.24 S 12779.53E 5964615.13 N 574934.91E 1.109 12815.52 15915.42 88.100 91.110 6428.52 6529.42 4180.83 S 12808.25E 5964614.78 N 574963.63E 0.436 12844.25 15991.60 86.310 94.380 6432.23 6533.13 4184.47 S 12884.24E 5964611.77 N 575039.65E 4.889 12920.26 16041.38 84.270 93.940 6436.32 6537.22 4188.07 S 12933.72E 5964608.58 N 575089.15E 4.192 12969.77 16085.12 82.160 93.450 6441.49 6542.39 4190.87 S 12977.06E 5964606.14 N 575132.52E 4.951 130.13.14 16130.40 82.160 95.710 6447.66 6548.56 4194.45 S 13021.77E 5964602.93 N 575177.26E 4.945 13057.88 16178.61 84.700 95.520 6453.18 6554.08 4199.13 S 13069.43E 5964598.63 N 575224.95E 5.283 13105.57 16223.39 85.200 97.700 6457.12 6558.02 4204.27 S 13113.74E 5964593.87 N 575269.30E 4.976 13149.92 16271.46 86.250 96.390 6460.70 6561.60 4210.15 S 13161.31E 5964588.38 N 575316.92E 3.487 13197.55 16314.89 85.380 96.520 6463.87 6564.77 4215.02 S 13204.35E 5964583.87 N 575360.00E 2.025 13240.63 16366.81 86.190 97.950 6467.69 6568.59 4221.54 S 13255.71E 5964577.77 N 575411.42E 3.159 13292.05 16412.06 87.980 97.180 6469.99 6570.89 4227.49 S 13300.51E 5964572.20 N 575456.26E 4.305 13336.89 16460.00 87.610 96.110 6471.84 6572.74 4233.03 S 13348.09E 5964567.05 N 575503.89E 2.360 13384.52 16502.51 87.920 96.060 6473.49 6574.39 4237.53 S 13390.33E 5964562.89 N 575546.16E 0.739 13426.80 16553.47 89.150 98.290 6474.80 6575.70 4243.89 S 13440.87E 5964556.95 N 575596.75E 4.996 13477.39 16596.09 89.890 99.020 6475.15 6576.05 4250.31 S 13483.00E 5964550.89 N 575638.94E 2.439 13519.58 16646.45 90.200 98.230 6475.11 6576.01 4257.86 S 13532.79E 5964543.75 N 575688.79E 1..685 13569.43 16695.59 90.510 97.430 6474.81 6575.71 4264.55 S 13581.47E 5964537.45 N 575737.52E 1.746 13618.17 16737.00 90.200 98.270 6474.55 6575.45 4270.21 S 13622.49E 5964532.14 N 575778.59E 2.162 13659.24 16784.93 90.330 98.350 6474.33 6575.23 4277.14 S 13669.92E 5964525.60 N 575826.07E 0.318 13706.72 16831.50 90.700 97.350 6473.91 6574.81 4283.50 S 13716.05E 5964519.63 N 575872.25E 2.289 13752.91 16878.88 90.510 96.370 6473.41 6574.31 4289.16 S 13763.09E 5964514.36 N 575919.33E 2.107 13799.99 • • 8 December, 2005 -10:15 Page 2 of 5 DrillQuest 3.03.06.008 Ha/liburton Sperry-Sun Survey Report for Kuparuk 1C -1C-28 Your Ref.• API 500292327000 Job No. AK 2Z-0003922104, Surveyed: 8 November, 2005 Western North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 16925.02 90.260 96.510 6473.10 6574.00 4294.33 S 13808.94E 5964509.56 N 575965.22E 0.621 13845.88 16973.05 90.270 96.340 6472.88 6573.78 4299.71 S 13856.66E 5964504.58 N 576012.99E 0.355 13893.66 17017.77 89.580 96.210 6472.94 6573.84 4304.59 S 13901.12E 5964500.06 N 576057.48E 1.570 13938.15 17067.36 91.500 96.570 6472.47 6573.37 4310.11 S 13950.39E 5964494.95 N 576106.81E 3.939 13987.47 17111.62 91.310 96.320 6471.39 6572.29 4315.08 S 13994.36E 5964490.35 N 576150.81E 0.709 14031.48 17160.55 87.980 96.470 6471.69 6572.59 4320.53 S 14042.98E 5964485.30 N 576199.47E 6.813 14080.15 17204.46 87.980 97.500 6473.24 6574.14 4325.86 S 14086.53E 5964480.33 N 576243.07E 2.344 14123.75 17254.97 90.570 101.270 6473.88 6574.78 4334.10 5 14136.35E 5964472.51 N 576292.96E 9.055 14173.63 17299.98 91.440 100.440 6473.09 6573.99 4342.57 S 14180.55E 5964464.40 N 576337.22E 2.671 14217.90 17345.38 92.670 100.130 6471.46 6572.36 4350.67 S 14225.19E 5964456.67 N 576381.93E 2.794 14262.61 17393.21 94.590 99.230 6468.43 6569.33 4358.70 S 14272.24E 5964449.03 N 576429.04E 4.432 14309.73 17435.84 95.460 95.360 6464.70 6565.60 4364.09 S 14314.35E 5964443.99 N 576471.20E 9.271 14351.89 17486.78 91.560 93.200 6461.58 6562.48 4367.88 S 14365.04E 5964440.61 N 576521.92E 8.748 14402.61 17542.54 89.150 89.700 6461.23 6562.13 4369.29 S 14420.77E 5964439.67 N 576577.66E 7.621 14458.35 17573.68 87.980 87.970 6462.01 6562.91 4368.66 S 14451.89E 5964440.56 N 576608.77E 6.705 14489.47 17625.57 89.280 89.970 6463.25 6564.15 4367.73 S 14503.76E 5964441.92 N 576660.63E 4.596 14541.32 17673.68 90.450 91.210 6463.37 6564.27 4368.23 S 14551.86E 5964441.82 N 576708.74E 3.544 14589.43 17716.30 89.590 90.920 6463.35 6564.25 4369.02 S 14594.47E 5964441.38 N 576751.35E 2.129 14632.05 17767.61 89.090 90.390 6463.94 6564.84 4369.60 S 14645.78E 5964441.22 N 576802.66E 1.420 14683.35 17810.30 89.520 90.520 6464.46 6565.36 4369.94 S 14688.46E 5964441.23 N 576845.35E 1.052 14726.04 17860.83 90.020 91.530 6464.66 6565.56 4370.85 S 14738.98E 5964440.75 N 576895.87E 2.230 14776.56 17905.51 89.950 91.620 6464.67 6565.57 4372.07 S 14783.65E 5964439.89 N 576940.54E 0.255 14821.24 17953.82 89.830 91.370 6464.77 6565.67 4373.34 S 14831.94E 5964439.03 N 576988.85E 0.574 14869.54 18003.62 90.020 90.480 6464.83 6565.73 4374.14 S 14881.73E 5964438.64 N 577038.64E 1.827 14919.34 18045.70 89.280 90.350 6465.09 6565.99 4374.44 S 14923.81E 5964438.68 N 577080.72E 1.785 14961.42 18096.17 89.830 89.240 6465.48 6566.38 4374.26 S 14974.28E 5964439.28 N 577131.19E 2.454 15011.88 18139.72 90.390 88.050 6465.40 6566.30 4373.23 S 15017.81E 5964440.67 N 577174.71E 3.020 15055.41 18187.22 91.990 87.850 6464.41 6565.31 4371.53 5 15065.27E 5964442.76 N 577222.16E 3.395 15102.85 18233.29 91.740 87.600 6462.91 6563.81 4369.71 S 15111.28E 5964444.97 N 577268.15E 0.767 15148.84 18282.34 89.150 90.500 6462.53 6563.43 4368.89 S 15160.31E 5964446.19 N 577317.17E 7.927 15197.86 18326.96 88.160 93.090 6463.58 6564.48 4370.29 S 15204.90E 5964445.16 N 577361.76E 6.213 15242.45 18376.36 89.400 95.100 6464.63 6565.53 4373.82 S 15254.15E 5964442.04 N 577411.05E 4.780 15291.74 18420.67 90.510 95.320 6464.66 6565.56 4377.84 S 15298.28E 5964438.38 N 577455.21E 2,554 15335.90 18466.95 91.560 92.610 6463.83 6564.73 4381.04 S 15344.44E 5964435.57 N 577501.39E 6.279 15382.08 18514.03 92.110 90.060 6462.32 6563.22 4382.14 S 15391.48E 5964434.86 N 577548.44E 5.538 15429.13 ConocoPhillips Comment • 8 December, 2005 -10:15 Page 3 of 5 DrillQuest 3.03.06.008 Ha/liburton Sperry-Sun Survey Report forKuparuk 1C -1C-28 Your Ref: API 500292327000 Job No. AK ZZ-0003922104, Surveyed: 8 November, 2005 ConocoPhillips Western North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 18562.51 88.970 90.080 6461.86 6562.76 4382.20 S 15439.95E 5964435.20 N 577596.91E 6.477 15477.60 18606.43 88.100 91.010 6462.99 6563.89 4382.61 S 15483.85E 5964435.15 N 577640.81E 2.899 15521.51 18653.27 88.970 92.080 6464.18 6565.08 4383.88 S 15530.66E 5964434.27 N 577687.63E 2.944 15568.32 18702.21 91.000 93.370 6464.20 6565.10 4386.20 S 15579.54E 5964432.35 N 577736.53E 4.915 15617.22 18749.33 92.470 93.190 6462.77 6563.67 4388.90 S 15626.56E 5964430.04 N 577783.57E 3.143 15664.26 18793.23 91.060 92.230 6461.42 6562.32 4390.97 S 15670.39E 5964428.33 N 577827.41E 3.885 15708.11 18844.09 88.780 92.520 6461.49 6562.39 4393.08 S 15721.20E 5964426.65 N 577878.24E 4.519 15758.94 18888.79 89.400 93.110 6462.20 6563.10 4395.27 S 15765.84E 5964424.82 N 577922.90E 1.915 15803.60 18934.13 88.720 92.940 6462.94 6563.84 4397.67 S 15811.11E 5964422.80 N 577968.18E 1.546 15848.89 18981.45 88.410 91.790 6464.13 6565.03 4399.62 S 15858.37E 5964421.24 N 578015.46E 2.516 15896.16 19025.44 87.860 88.880 6465.56 6566.46 4399.88 S 15902.34E 5964421.35 N 578059.42E 6.729 15940.13 19075.87 88.350 89.010 6467.23 6568.13 4398.95 S 15952.73E 5964422.69 N 578109.81E 1.005 15990.51 19123.66 88.600 89.940 6468.50 6569.40 4398.51 S 16000.50E 5964423.53 N 578157.57E 2.014 16038.27 19167.90 90.940 90.160 6468.68 6569.58 4398.55 S 16044.74E 5964423.86 N 578201.81E 5.313 16082.51 19216.19 91.810 89.670 6467.52 6568.42 4398.48 S 16093.01E 5964424.33 N 578250.08E 2.068 16130.78 19258.21 92.550 90.830 6465.92 6566.82 4398.66 S 16135.00E 5964424.49 N 578292.07 E 19303.86 93.350 90.780 6463.57 6564.47 4399.30 S 16180.58E 5964424.23 N 578337.66 E 19323.65 93.720 90.600 6462.35 6563.25 4399.54 S 16200.34E 5964424.15 N 578357.41 E ,,. 19367.00 93.720 90.600 6459.54 6560.44 - 4399.99 S 16243.59E 5964424.06 N 578400.67 E All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 90.500° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 19367.OOft., The Bottom Hole Displacement is 16828.97ft., in the Direction of 105.156° (True). 3.273 16172.77 1.756 16218.36 2.078 16238.11 0.000 16281.37 Projected Survey • 8 December, 2005 -10:15 Page 4 of 5 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for Kuparuk 1 C -1 C-28 Your Ref: AP/ 500292327000 Job No. AK ZZ-0003922104, Surveyed: 8 November, 2005 Western North Slope Comments ConocoPhillips Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 15059.07 6520.52 4056.10 S 11966.09E Tie-On Point • 19367.00 6560.44 4399.99 S 16243.59E Projected Survey Survey tool program for 1 C-28 From To Measured Vertical Measured Vertical Depth Depth Depth Depth Survey Tool Description (ft) (ft) (ft) (ft) 0.00 0.00 924.50 920.60 CB-SS-Gyro (1C-28PB1) 924.50 920.60 19367.00 6560.44 MWD+IIFR+MS+SAG (1C-28P61) • 8 December, 2005 -10:15 Page 5 of 5 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Western North Slope ConocoPhillips Kuparuk 1 C 1 C-28PB 1 Job No. AK ZZ-0003922104, Surveyed: 11 October, 2005 Survey Report 8 December, 2005 Your Ref.• API 500293327070 . Surtace Coordinates: 5968689.43 N, 562121.21 E (70° 19' 29.9481" N, 149° 29' 46.5750" YID Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surtace Coordinates relative to Project H Reference: 968689.43 N, 62121.21E (Grid) Surtace Coordinates relative to Stucture Reference: 169.04 N, 249.45 W (True) Kelly Bushing Elevation: 100.90ft above Mean Sea Level Kelly Bushing Elevation: 100.90ft above Project V Reference Kelly Bushing Elevation: 100.90ft above Structure Reference ~ ' ~. ~ Survey Ref.• svy2197 x fitaH6buno» company Ha/liburton Sperry-Sun Survey Report for Kuparuk 1 C -1 C-28PB 1 Your Ref.• API 500293327070 Job No. AK-ZZ-0003922104, Surveyed: 11 October, 2005 Western North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 0.00 0.000 0.000 -100.90 0.00 0.00 N 0.00E 5968689.43 N 562121.21E 0.00 119.00 0.400 155.600 18.10 119.00 0.38 S 0.17E 5968689.05 N 562121.38E 0.336 0.17 175.00 0.960 139.530 74.09 174.99 0.91 S 0.56E 5968688.52 N 562121.77E 1.047 0.56 260.00 1.050 123.760 159.08 259.98 1.89 S 1.67E 5968687.56 N 562122.89E 0.341 1.68 360.00 2.560 114.310 259.03 359.93 3.32 S 4.46E 5968686.15 N 562125.70E 1.534 4.49 455.00 3.850 111.340 353.88 454.78 5.35 S 9.37E 5968684.16 N 562130.62E 1.369 9.41 545.00 4.490 110.670 443.64 544.54 7.69 S 15.48E 5968681.86 N 562136.75E 0.713 15.55 640.00 5.820 108.820 538.25 639.15 10.56 S 23.52E 5968679.06 N 562144.81E 1.411 23.61 731.00 8.150 103.320 628.57 729.47 13.54 S 34.16E 5968676.18 N 562155.48E 2.661 34.28 826.50 9.060 101.100 723.00 823.90 16.54 S 48.13E 5968673.29 N 562169.47E 1.014 48.27 924.50 9.620 100.390 819.70 920.60 19.50 S 63.75E 5968670.45 N 562185.12E 0.583 63.92 954.30 10.500 99.980 849.04 949.94 20.42 S 68.88E 5968669.58 N 562190.25E 2.963 69.05 1050.67 15.100 102.810 942.99 1043.89 24.73 S 89.78E 5968665.44 N 562211.19E 4.816 89.99 1146.35 18.380 102.130 1034.60 1135.50 30.67 S 116.69E 5968659.73 N 562238.15E 3.434 116.95 1242.48 17.850 102.650 1125.97 1226.87 37.08 S 145.88E 5968653.56 N 562267.39E 0.576 146.20 1338.24 19.030 106.750 1216.81 1317.71 44.79 S 175.15E 5968646.09 N 562296.73E 1.830 175.53 1431.11 23.510 111.270 1303.34 1404.24 55.88 S 206.93E 5968635.26 N 562328.59E 5.134 207.41 1526.52 27.010 112.170 1389.62 1490.52 70.96 S 244.74E 5968620.49 N 562366.53E 3.690 245.35 1621.51 29.310 112.920 1473.36 1574.26 88.16 S 286.13E 5968603.64 N 562408.06E 2.450 286.89 1716.91 31.280 115.060 1555.73 1656.63 107.75 S 330.08E 5968584.42 N 562452.17E 2.354 331.01 1813.14 35.320 115.240 1636.14 1737.04 130.20 S 377.89E 5968562.36 N 562500.17E 4.200 379.02 1908.24 38.250 114.710 1712.30 1813.20 154.23 S 429.51E 5968538.76 N 562551.99E 3.099 430.84 2002.50 40.620 115.930 1785.09 1885.99 179.85 S 483.62E 5968513.59 N 562606.31E 2.645 485.17 2097.89 43.930 114.900 1855.67 1956.57 207.37 S 541.58E 5968486.55 N 562664.49E 3.545 543.37 2193.21 47.270 113.570 1922.35 2023.25 235.30 S 603.68E 5968459.14 N 562726.82E 3.643 605.71 2288.13 48.780 112.200 1985.83 2086.73 262.73 S 668.69E 5968432.24 N 562792.05E 1.919 670.96 2383.69 51.680 111.290 2046.96 2147.86 289.93 S 736.91E 5968405.61 N 562860.49E 3.122 739.41 2479.43 57.280 110.860 2102.56 2203.46 317.93 S 809.59E 5968378.22 N 562933.41E 5.861 812.34 2570.63 61.790 111.570 2148.79 2249.69 346.38 S 882.85E 5968350.38 N 563006.90E 4.990 885.84 2668.73 68.710 111.300 2189.83 2290.73 378.91 S 965.73E 5968318.53 N 563090.04E 7.058 969.00 2763.85 70.720 111.050 2222.81 2323.71 411.13 S 1048.92E 5968287.00 N 563173.50E 2.127 1052.47 2858.99 70.360 110.090 2254.50 2355.40 442.65 S 1132.91E 5968256.17 N 563257.74E 1.024 1136.73 2954.28 70.550 110.260 2286.38 2387.28 473.62 S 1217.20E 5968225.90 N 563342.29E 0.261 1221.28 3049.96 70.210 110.200 2318.51 2419.41 504.79 S 1301.76E 5968195.44 N 563427.11E 0.360 1306.12 3144.74 69.530 108.250 2351.13 2452.03 534.09 S 1385.78E 5968166.83 N 563511.37E 2.061 1390.39 ConocoPhillips Comment CB-SS-Gyro MWD+IIFR+MS+SAG • 8 December, 2005 - 9:15 Page 2 of 7 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for Kuparuk 1 C -1 C-28P61 Your Ref: API 500293327070 Job No. AK ZZ-000392?104, Surveyed: 11 October, 2005 ConocoPhillips Western North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 3219.29 66.290 109.880 2379.17 2480.07 556.64 S 1451.06E 5968144.82 N 563576.83E 4.795 1455.87 3333.38 65.780 110.720 2425.51 2526.41 592.81 S 1548.84E 5968109.47 N 563674.91E 0.808 1553.96 3428.08 68.780 111.820 2462.08 2562.98 624.50 S 1630.23E 5968078.45 N 563756.55E 3.344 1635.62 3523.48 67.470 111.670 2497.62 2598.52 657.30 S 1712.46E 5968046.33 N 563839.05E 1.381 1718.13 3618.99 67.560 111.810 2534.15 2635.05 689.98 S 1794.43E 5968014.32 N 563921.29E 0.165 1800.38 3713.88 70.640 112.650 2568.00 2668.90 723.52 S 1876.48E 5967981.47 N 564003.61E 3.350 1882.72 3809.24 68.670 112.090 2601.15 2702.05 757.55 S 1959.15E 5967948.12 N 564086.57E 2.138 1965.69 3903.81 68.980 112.820 2635.31 2736.21 791.24 S 2040.65E 5967915.11 N 564168.34E 0.791 2047.48 3999.11 69.320 112.630 2669.23 2770.13 825.64 S 2122.80E 5967881.39 N 564250.77E 0.402 2129.92 4094.63 70.420 111.020 2702.11 2803.01 858.98 S 2206.05E 5967848.75 N 564334.29E 1.957 2213.46 4189.64 69.800 109.760 2734.43 2835.33 890.10 S 2289.79E 5967818.31 N 564418.29E 1.407 2297.47 4284.47 68.400 108.930 2768.26 2869.16 919.45 S 2373.38E 5967789.66 N 564502.12E 1.688 2381.31 4379.68 68.000 107.650 2803.62 2904.52 947.20 S 2457.31E 5967762.61 N 564586.27E 1.317 2465.48 4475.26 69.720 107.520 2838.09 2938.99 974.13 S 2542.29E 5967736.38 N 564671.47E 1.804 2550.69 4568.68 71.650 107.000 2868.99 2969.89 1000.28 S 2626.47E 5967710.92 N 564755.88E 2.132 2635.10 4662.62 72.390 106.300 2897.98 2998.88 1025.88 S 2712.08E 5967686.03 N 564841.69E 1.060 2720.93 4758.87 69.960 106.740 2929.04 3029.94 1051.78 S 2799.41E 5967660.86 N 564929.24E 2.561 2808.49 4854.02 70.040 107.490 2961.58 3062.48 1078.10 S 2884.87E 5967635.25 N 565014.90E 0.745 2894.16 4950.27 68.790 107.790 2995.42 3096.32 1105.40 S 2970.73E 5967608.66 N 565100.99E 1.331 2980.27 5047.02 70.560 107.480 3029.03 3129.93 1132.88 S 3057.19E 5967581.90 N 565187.68E 1.854 3066.96 5141.58 71.950 106.900 3059.42 3160.32 1159.34 S 3142.73E 5967556.14 N 565273.43E 1.581 3152.73 5237.11 71.430 107.240 3089.43 3190.33 1185.97 S 3229.43E 5967530.24 N 565360.35E 0.641 3239.66 5332.95 70.620 107.470 3120.59 3221.49 1213.00 S 3315.94E 5967503.92 N 565447.08E 0.875 3326.40 5428.29 69.650 107.720 3152.99 3253.89 1240.10 S 3401.41E 5967477.53 N 565532.77E 1.047 3412.10 5523.38 71.710 108.740 3184.45 3285.35 1268.18 S 3486.63E 5967450.16 N 565618.22E 2.391 3497.57 5617.64 71.370 109.520 3214.29 3315.19 1297.48 S 3571.10E 5967421.56 N 565702.93E 0.864 3582.29 5713.20 71.410 109.620 3244.79 3345.69 1327.81 S 3656.44E 5967391.93 N 565788.51E 0.108 3667.88 5808.19 70.890 110.980 3275.48 3376.38 1359.00 S 3740.75E 5967361.45 N 565873.08E 1.461 3752.46 5903.34 70.390 111.180 3307.02 3407.92 1391.29 S 3824.51E 5967329.85 N 565957.10E 0.562 3836.50 5999.05 70.960 111.230 3338.69 3439.59 1423.95 S 3908.71E 5967297.88 N 566041.57E 0.598 3920.99 6093.43 70.720 111.360 3369.67 3470.57 1456.33 S 3991.77E 5967266.19 N 566124.90E 0.286 4004.33 6193.71 71.230 111.130 3402.36 3503.26 1490.68 S 4080.13E 5967232.57 N 566213.54E 0.553 4092.99 6289.55 70.300 110.960 3433.93 3534.83 1523.18 S 4164.59E 5967200.78 N 566298.26E 0.985 4177.72 6384.74 69.260 110.640 3466.83 3567.73 1554.90 S 4248.09E 5967169.75 N 566382.02E 1.137 4261.49 6479.83 70.020 110.180 3499.92 3600.82 1585.99 S 4331.64E 5967139.36 N 566465.83E 0.919 4345.31 8 December, 2005.9:15 Page 3 of 7 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for Kuparuk 1 C - 1 C-28P61 Your Ref.• API 500293327070 Job No. AK ZZ-0003922104, Surveyed: 11 October, 2005 ConocoPhillips Western North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 6574.88 70.470 110.680 3532.04 3632.94 1617.21 S 4415.47E 5967108.83 N 566549.91E 0.685 4429.41 6670.41 69.930 108.740 3564.41 3665.31 1647.53 S 4500.08E 5967079.21 N 566634.77E 1.993 4514.28 6765.89 70.200 107.560 3596.96 3697.86 1675.49 S 4585.37E 5967051.96 N 566720.29E 1.196 4599.81 6861.20 70.040 107.820 3629.37 3730.27 1702.72 S 4670.76E 5967025.43 N 566805.91E 0.307 4685.44 6956.94 70.330 107.790 3661.83 3762.73 1730.26 S 4756.52E 5966998.60 N 566891.89E 0.304 4771.44 7052.28 71.150 108.490 3693.27 3794.17 1758.29 S 4842.05E 5966971.29 N 566977.65E 1.105 4857.21 7145.48 71.040 107.850 3723.47 3824.37 1785.78 S 4925.82E 5966944.49 N 567061.65E 0.660 4941.22 7241.73 71.400 108.120 3754.46 3855.36 1813.92 S 5012.49E 5966917.07 N 567148.55E 0.459 5028.13 7336.78 70.100 107.730 3785.79 3886.69 1841.54 S 5097.87E 5966890.16 N 567234.15E 1.421 5113.75 7431.81 69.290 107.520 3818.77 3919.67 1868.52 S 5182.81E 5966863.88 N 567319.31E 0.877 5198.92 7526.00 72.440 109.230 3849.64 3950.54 1896.58 S 5267.24E 5966836.52 N 567403.97E 3.758 5283.59 7621.80 72.440 109.050 3878.55 3979.45 1926.53 S 5353.53E 5966807.29 N 567490.50E 0.179 5370.14 7716.59 71.850 110.400 3907.61 4008.51 1956.98 S 5438.46E 5966777.54 N 567575.68E 1.492 5455.33 7811.65 72.060 109.250 3937.06 4037.96 1987.63 S 5523.48E 5966747.59 N 567660.96E 1.171 5540.62 7907.15 71.060 110.740 3967.27 4068.17 2018.60 S 5608.62E 5966717.33 N 567746.34E 1.813 5626.02 8002.80 71.200 110.410 3998.20 4099.10 2050.41 S 5693.35E 5966686.22 N 567831.34E 0.358 5711.03 8097.58 71.990 110.810 4028.13 4129.03 2082.07 S 5777.53E 5966655.26 N 567915.78E 0.925 5795.48 8192.42 70.030 109.820 4058.99 4159.89 2113.20 S 5861.62E 5966624.82 N 568000.12E 2.290 5879.84 8286.39 70.100 109.950 4091.03 4191.93 2143.25 S 5944.69E 5966595.46 N 568083.44E 0.150 5963.17 8381.70 70.230 110.240 4123.37 4224.27 2174.06 S 6028.89E 5966565.36 N 568167.89E 0.317 6047.63 8477.19 70.090 110.120 4155.78 4256.68 2205.04 S 6113.20E 5966535.07 N 568252.45E 0.188 6132.21 8570.85 71.030 110.600 4186.95 4287.85 2235.77 S 6196.00E 5966505.03 N 568335.51E 1.114 6215.27 8666.74 70.160 109.350 4218.81 4319.71 2266.67 S 6281.00E 5966474.84 N 568420.76E 1.528 6300.54 . 8762.10 68.860 109.130 4252.19 4353.09 2296.10 S 6365.33E 5966446.10 N 568505.33E 1.380 6385.13 8857.00 69.940 109.790 4285.58 4386.48 2325.70 S 6449.09E 5966417.20 N 568589.33E 1.311 6469.14 8951.81 71.300 109.580 4317.04 4417.94 2355.82 S 6533.30E 5966387.77 N 568673.79E 1.450 6553.61 9047.07 69.520 109.940 4348.98 4449.88 2386.16 S 6617.76E 5966358.13 N 568758.49E 1.902 6638.33 9142.22 68.500 108.520 4383.06 4483.96 2415.42 S 6701.63E 5966329.57 N 568842.61E 1.758 6722.45 9185.30 68.980 109.560 4398.68 4499.58 2428.52 S 6739.58E 5966316.78 N 568880.66E 2.511 6760.52 9316.75 69.050 109.090 4445.76 4546.66 2469.14 S 6855.40E 5966277.13 N 568996.81E 0.338 6876.68 9410.88 70.770 107.250 4478.09 4578.99 2496.69 S 6939.39E 5966250.27 N 569081.03E 2.590 6960.91 9504.63 70.240 106.550 4509.38 4610.28 2522.39 S 7023.94E 5966225.28 N 569165.79E 0.903 7045.69 9598.68 68.550 108.540 4542.48 4643.38 2548.91 S 7107.88E 5966199.45 N 569249.94E 2.674 7129.85 9693.94 67.610 106.970 4578.04 4678.94 2575.86 S 7192.03E 5966173.19 N 569334.32E 1.820 7214.24 9788.46 66.940 107.510 4614.56 4715.46 2601.70 S 7275.30E 5966148.04 N 569417.80E 0.883 7297.73 8 December, 2005 - 9:15 Page 4 of 7 DrillQuest 3.03.06.008 Ha/liburton Sperry-Sun Survey Report for Kuparuk 1C -1C-28PB1 Your Ref.• API 500293327070 Job No. AK-ZZ-0003922104, Surveyed: 11 October, 2005 Western North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 9883.82 68.570 109.360 4650.66 4751.56 2629.62 S 7359.02E 5966120.82 N 569501.75E 2.479 7381.69 9979.18 69.620 110.780 4684.68 4785.58 2660.19 S 7442.69E 5966090.94 N 569585.67E 1.774 7465.62 10075.49 69.160 110.190 4718.59 4819.49 2691.74 S 7527.14E 5966060.10 N 569670.37E 0.746 7550.34 10170.92 68.020 109.470 4753.42 4854.32 2721.88 S 7610.71E 5966030.65 N 569754.19E 1.386 7634.17 10265.71 70.400 106.590 4787.07 4887.97 2749.29 S 7694.96E 5966003.94 N 569838.67E 3.791 7718.66 10361.36 68.210 107.100 4820.87 4921.77 2775.21 S 7780.60E 5965978.73 N 569924.52E 2.343 7804.52 10456.80 66.750 107.190 4857.42 4958.32 2801.20 S 7864.84E 5965953.43 N 570008.97E 1.532 7888.99 10563.76 64.880 106.900 4901.24 5002.14 2829.80 S 7958.12E 5965925.61 N 570102.48E 1.766 7982.51 10655.25 62.480 107.760 4941.81 5042.71 2854.22 S 8036.40E 5965901.84 N 570180.96E 2.755 8061.00 10754.61 60.220 108.290 4989.44 5090.34 2881.19 S 8119.31E 5965875.55 N 570264.09E 2.322 8144.14 10851.14 58.200 110.180 5038.85 5139.75 2908.50 S 8197.60E 5965848.90 N 570342.61E 2.685 8222.67 10945.18 57.760 110.700 5088.72 5189.62 2936.34 S 8272.31E 5965821.67 N 570417.55E 0.662 8297.62 11038.98 56.350 110.980 5139.73 5240.63 2964.34 S 8345.88E 5965794.28 N 570491.34E 1.524 8371.43 11047.96 56.250 111.200 5144.71 5245.61 2967.03 S 8352.85E 5965791.65 N 570498.33E 2.323 8378.42 11144.52 58.390 110.010 5196.84 5297.74 2995.62 S 8428.92E 5965763.69 N 570574.64E 2.447 8454.74 11248.48 61.880 108.380 5248.61 5349.51 3025.23 S 8514.05E 5965734.78 N 570660.01E 3.622 8540.13 11348.25 65.080 107.830 5293.15 5394.05 3052.97 S 8598.89E 5965707.75 N 570745.08E 3.245 8625.21 11446.91 69.890 105.470 5330.92 5431.82 3079.04 S 8686.19E 5965682.40 N 570832.59E 5.352 8712.73 11545.17 72.230 104.700 5362.81 5463.71 3103.22 S 8775.92E 5965658.97 N 570922.52E 2.494 8802.67 11641.85 71.640 105.320 5392.79 5493.69 3127.02 S 8864.70E 5965635.90 N 571011.49E 0.863 8891.65 11739.45 72.460 106.160 5422.87 5523.77 3152.21 S 8954.06E 5965611.45 N 571101.06E 1.173 8981.23 11838.60 73.780 105.500 5451.66 5552.56 3178.09 S 9045.34E 5965586.33 N 571192.55E 1.476 9072.73 11940.73 73.080 106.230 5480.79 5581.69 3204.85 S 9139.50E 5965560.35 N 571286.93E 0.969 9167.12 12035.71 72.480 106.220 5508.91 5609.81 3230.20 S 9226.61E 5965535.72 N 571374.24E 0.632 9254.45 12134.70 71.860 108.470 5539.22 5640.12 3258.29 S 9316.55E 5965508.38 N 571464.42E 2.253 9344.63 12233.47 72.930 104.850 5569.10 5670.00 3285.26 S 9406.73E 5965482.15 N 571554.81E 3.657 9435.04 12332.84 73.410 104.720 5597.87 5698.77 3309.54 S 9498.69E 5965458.64 N 571646.98E 0.499 9527.21 12431.89 72.300 106.280 5627.07 5727.97 3334.82 S 9589.90E 5965434.11 N 571738.38E 1.876 9618.63 12527.43 72.100 107.020. 5656.28 5757.18 3360.89 S 9677.05E 5965408.77 N 571825.75E 0.767 9706.01 12622.95 71.500 107.720 5686.11 5787.01 3387.98 S 9763.65E 5965382.40 N 571912.57E 0.938 9792.84 12718.29 72.600 108.980 5715.50 5816.40 3416.53 S 9849.73E 5965354.55 N 571998.89E 1.706 9879.17 12812.98 73.450 110.150 5743.14 5844.04 3446.86 S 9935.07E 5965324.93 N 572084.47E 1.484 9964.77 12908.84 72.560 109.630 5771.16 5872.06 3478.05 S 10021.27E 5965294.46 N 572170.93E 1.064 10051.24 13003.40 72.260 108.830 5799.74 5900.64 3507.74 S 10106.38E 5965265.47 N 572256.28E 0.867 10136.60 13097.67 72.410 108.130 5828.35 5929.25 3536.21 S 10191.57E 5965237.71 N 572341.70E 0.725 10222.04 ConocoPhillips Comment • 8 December, 2005 - 9:15 Page 5 of 7 DrillQuest 3.03.06.008 Ha/liburton Sperry-Sun Survey Report forKuparuk 1C -1C-28PB1 Your Ref: API 500293327070 Job No. AK ZZ-0003922104, Surveyed: 11 October, 2005 Western North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 13193.75 73.460 108.010 5856.54 5957.44 3564.70 S 10278.89E 5965209.94 N 572429.26E 1.099 10309.60 13288.59 73.680 108.430 5883.37 5984.27 3593.14 S 10365.29E 5965182.22 N 572515.89E 0.484 10396.26 13384.05 72.360 109.850 5911.24 6012.14 3623.07 S 10451.54E 5965153.00 N 572602.39E 1.984 10482.76 13479.71 73.870 110.870 5939.03 6039.93 3654.92 S 10537.36E 5965121.87 N 572688.46E 1.880 10568.85 13575.84 72.650 110.410 5966.72 6067.62 3687.37 S 10623.50E 5965090.13 N 572774.87E 1.349 10655.27 13671.01 70.430 107.480 5996.86 6097.76 3716.69 S 10708.86E 5965061.52 N 572860.47E 3.737 10740.89 13765.65 70.150 107.060 6028.77 6129.67 3743.14 S 10793.94E 5965035.78 N 572945.77E 0.512 10826.19 13860.55 70.500 106.940 6060.73 6161.63 3769.26 S 10879.40E 5965010.36 N 573031.44E 0.388 10911.87 13954.75 71.430 105.380 6091.45 6192.35 3794.04 S 10964.92E 5964986.29 N 573117.17E 1.851 10997.61 14050.09 69.210 105.780 6123.56 6224.46 3818.15 S 11051.39E 5964962.90 N 573203.83E 2.362 11084.29 14146.09 70.040 105.830 6156.98 6257.88 3842.66 S 11137.98E 5964939.10 N 573290.62E 0.866 11171.09 14241.46 71.190 105.620 6188.63 6289.53 3867.04 S 11224.58E 5964915.44 N 573377.41E 1.224 11257.89 14336.38 72.380 105.860 6218.30 6319.20 3891.50 S 11311.36E 5964891.70 N 573464.39E 1.276 11344.89 14431.26 73.670 105.770 6246.00 6346.90 3916.23 S 11398.67E 5964867.69 N 573551.91E 1.363 11432.41 14526.21 71.430 106.120 6274.47 6375.37 3941.11 S 11485.76E 5964843.54 N 573639.20E 2.385 11519.71 14621.72 73.530 105.720 6303.22 6404.12 3966.09 S 11573.34E 5964819.28 N 573726.98E 2.235 11607.51 14717.68 76.660 104.500 6327.90 6428.80 3990.25 S 11662.85E 5964795.86 N 573816.69E 3.485 11697.23 14769.76 77.900 104.900 6339.37 6440.27 4003.15 S 11711.99E 5964783.38 N 573865.94E 2.496 11746.48 14812.39 79.500 103.630 6347.73 6448.63 4013.44 S 11752.50E 5964773.41 N 573906.53E 4.756 11787.08 14905.36 80.800 101.070 6363.63 6464.53 4033.03 S 11841.97E 5964754.57 N 573996.16E 3.052 11876.72 15002.18 81.740 99.130 6378.33 6479 .23 4049.81 S 11936.18E 5964738. 57 N 574090. 51 E 15054.34 80.480 97.850 6386.39 6487 .29 4057.42 S 11987.15E 5964731. 38 N 574141. 54 E 15095.40 79.930 97.410 6393.37 6494 .27 4062.79 S 12027.25E 5964726. 34 N 574181. 68 E 15139.57 78.860 95.370 6401.50 6502 .40 4067.62 S 12070.40E 5964721. 87 N 574224. 86 E 15168.02 78.290 94.470 6407.14 6508 .04 4070.02 S 12098.18E 5964719. 71 N 574252. 67 E 15202.00 78.290 94.470 6414.04 6514 .94 4072.61 S 12131.35E 5964717. 39 N 574285. 86 E All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 90.500° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 15202.OOft., The Bottom Hole Displacement is 12796.71 ft., in the Direction of 108.557° (True). ConocoPhillips 2.206 11971.07 3.422 12022.10 1.706 12062.25 5.145 12105.43 3.692 12133.23 Comment 0.000 12166.43 Projected Survey r~ L_J • 8 December, 2005 - 9:15 Page 6 of 7 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for Kuparuk 1 C- 1 C-28PB 1 Your Ref.• APl 500293327070 Job No. AK-ZZ-0003922104, Surveyed: 11 October, 2005 Western North Slope Comments ConocoPhillips Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 15202.00 6514.94 4072.61 S 12131.35E Projected Survey • Survey tool program for 1C-28PB1 From To Measured Vertical Measured Vertical Depth Depth Depth Depth Survey Tool Description (ft) (ft) (ft) (ft) 0.00 0.00 924.50 920.60 CB-SS-Gyro 924.50 920.60 15202.00 6514.94 MWD+IIFR+MS+SAG • 8 December, 2005 - 9:15 Page 7 of 7 DrillQuest 3.03.06.008 ~o•g/•i ~~~ -~~~~ So~S// crw~~5'O/ ~'6 i v -~l ~~zzs~ rlur, Sl/ S/ ,So •/ •/i Q~ soE'S a~ lash ~~8~/Si/- ~.1? Y ! 9~ o~ I/S9 ~obu•ctoz ~S/ sv o~ • o/ Qk, zoz ~Sl ~- Clt6,L/o ~~ So•Si •o/ ~ -~t~'s CI3d ,ZZZ ~ ~ o/ `~ _ i.~ ~ru QZI ~~~ %/ ~'L/- Sv2 l sa.,~ • 9/ awlL.B%/ ~~~ L ~ ~ 11-Jan-06 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well 1 C-28 o2p S- I d 4- Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey Window /Kickoff Survey Projected Survey 15,059.07' MD 0.00' MD (if applicable) 19,367.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Date Signed Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) .7 11-Jan-06 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well 1C-28 PB1 Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: Window /Kickoff Survey: Projected Survey 0.00' MD 0.00' MD (if applicable) 15,202.00' MD a o s - - O4-, PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Date Signed, Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) Re: 1G28 drill pipe tally error Subject: Re: 1G28 drill pzpe tally error From: Thomas Maunder <torn_maut~der@adinin.state.ak.us= Date: ~'ri, 28 Oct 2005 14:38:55=0800 To: "Billir~~~slev, "hi«i :~~" ~~'I~im.!~.Billin~~sleti~~u.conocophillips.con~== cos-goy Tim, Thanks for the explanation. It appears that no harm was done despite drilling the additional measured footage. Your FIT plot indicates that there was no leakoff. Hopefully, the remainder of the well will go smoothly. Keep us informed if any other difficulties are encountered. Tom Maunder, PE AOGCC Billingsley, Tim A wrote, On 10/28/2005 2:28 PM: Tom, Attached is the sequence of events regarding the last few days at Doyon 15 and the drill pipe tally errors which resulted in drilling 119' MD (15' TVD) of new formation below the 7-5/8" intermediate casing before stopping to do the FIT. Also attached is the 12.5 ppg EMW formation integrity test conducted at 14,919' MD which passed. We are drilling ahead at 15, 200' now and doing well. Tim Billingsley Drilling Engineer 907-265-6531 office 907-346-3092 home 907-230-9378 cell «drill pipe tally error.doc » «1C-28 LOT 10-28-2005 Ver 1-3.xls» 1 of 1 10!2812005 2:39 PM 1 C-28 4" Drill Pipe Tally Failure Doyon Rig 15 10/28/05 ~~ ~'_' ~ On Well 1 C-28, the 4" drill pipe tally was incorrect. This resulted in drilling out the float collar and to within 26' of the float shoe before doing the 7-5/8" casing test which failed. Then the 7-5/8" test packer was run and verified that the leak was out the shoe and not in the 7-5/8" casing. The second drill out assembly drilled with the incorrect tally and ended up drilling 119' instead of 40' of new formation before the mistake was discovered. The FIT to 12.5 ppg was conducted at that time and a 12.5 ppg EMW FIT was successful. A summary of events is as follows: 1 Drilled 9-7/8" hole to 14,800' with correct 5" drill pipe tally. 2 Ran 7-5/8" casing with correct tally, float shoe at 14,781', float collar at 14,691'. 3 Pumped cement, plug did not bump. (shut down pumping due to calculated displacement of volume to float collar plus % of float track). 4 Drilling assembly with incorrect 4" drill pipe tally tagged top of cement at 14,598' (correct depth was later determined to be 14,683') 5 Drilled up cement down to incorrect depth of 14,670' (correct depth later determined to be 14,755' which is 26' above the 7-5/8" shoe at 14781') 6 Performed 7-5/8" casing test to 3500 psi. Test failed, pressure Peaked off to 1100 psi in 40 min. 7 POOH with drilling assembly, found a +6.3' correction to drill pipe tally due to jars not being fully included in tally (there will be a larger correction made late in step #9 below) 8 Ran 7-5/8" test packer and tested casing good at 14,660' (correct depth later determined to be 14,739') Leak was below test packer depth. 9 Ran drilling assembly, drilled up cement and 40' of new formation to 14,840'. Drill pipe tally mistake was discovered by LWD resistivity tool logging the bottom 7-5/8" casing shallower than expected. Checked tally and determined that some Lo-Tad torque reduction subs were not included in 4" drill pipe tally. Correction was +78.69'. Corrected tally shows casing shoe at 14,779' on LWD log which is real close to casing tally of 14,781'. Corrected tally shows total depth drilled to was 14,119' or 119' of new formation instead of the intended 40' of new formation. 10 Performed FIT test to 12.5 ppg EMW by pressuring up to 1100 psi (TVD = 6508', MW=9.2 ppg), no break over on the increase in pressure up to 1100 psi and lost only 30 psi in 10 min after the pumps were shut down. Plan Forward: Drill 6-3/4" horizontal production hole. Run 4-1/2" slotted liner, run 4-1/2" tubing. Tim Billingsley 10/28/05 PRESSURE INTEGRITY TEST t CONOCOPHILLIPS Alaska, Inc. ~~~- ~ ~ ~ Well Name: 1 ~.1-M3 Rig: ~Jt3~C~3 ~i~ ~€ ~ Date: 1 ~'-~'?/~;OrS Volume Input Volume/Stroke Pum Rate: Drilling Supervisor: G.~:+s~,r€~tillr+l;~({Y;,~E~}f€€€M ~.i7eF. P~n~~s ~s:ea~: #1 Mud Pump ~ Strokes ~ ~;.,r ~.~~ J~ Bbls/Strk ~ ~.~~ Strk/min ~ T f T t d P i ype o es : Casing Shoe Test LOT/FIT ~ ump own ng annulus and DP. ~ Casin Test Pressure In te ri Test Hole Size: s-s/4" ~ Casin Shoe De th Hole De th Pum in Shut-in Pum in Shut-in RKB-CHF: X0.3 Ft 1~7~s0_:~ Ft-MD ;~~:~~~.: Ft-TV 1~~~'l:~,3 Ft-MD 55,~~'.~a Ft-TVD Strks si Min si Strks si Min si Casing Size and Description: 7-5/s" 29.7#/Ft L-80 BTC-MOD ~ ;~ ~ 0 3570 ~ :~ 0.00 1 '€ 2r Casin Test Pressure Int e ri Test ~ 1 X70 1 35€;0 2 `: y0 0.25 ~ 120 Mud Weight: ~.~ ppg Mud Weight: :?.~ ppg 4 17i~ 2 :>>~;G ~ ~~;CI 0.50 I'I Mud 10 min Gel: 15.0 Lb/100 Ft2 Mud 10 min Gel: a.€3 Lb/100 Ft2 ~ 200 3 OCi ~ 3~~3 1.00 I1~€; Test Pressure: u50t~.0 psi Rotating Weight: ~s~::s'~~ Lbs o ?50 4 u55:3 ~ ;~0:3 1.50 1 ~ Rotating Weight: ~~ Lbs Blocks/Top Drive Weight: 70.0 Lbs 10 k20 5 3550 ':0 3~0 2.00 1 ~€ Blocks/Top Drive Weight rt3.0 Lbs Desired PIT EMW: 12.5 ppg 1" ~;)i3 6 35€;0 "s2 ~yL 2.50 ~ ~€~30 Estimates for Test: 8.1 bbls Estimates for Test: 1117 si 2.6 bbls 1 ~ 570 7 ~">~;~:~ ~ ~n0 3.00 I 'i ~~; ~ • 1 ~, 550 8 355;3 ~ 5 5~:~ 3.50 ~ ~ Or EMW =Leak-off Pressure + Mud Weight = 1120 + 9 2 PIT 15 Second 13 ~i`'~0 9 35€;0 '; 8 ?~~0 4.00 ~ ~€ 0~ 0.052 x TVD 0.052 x 6508 Shut-in Pressure si '0 8~0 10 ~~~`xt;0 20 h~:0 4.50 ~ .I 00 EMW at 14780.6 Ft-MD 6507.7 Ft-TVD) = 12.5 1120 ~2 `~30 15 '~55~3 2~ ~~:~ 5.00 11i~E;~ 4000 ` ` ` Lost 20 ps i durin g test, held L~ : €;sC • 20 .;~s~+3 ~M ~:~'~ 5.50 11 i~0 ° ~ ` 99.4 k of test pre ssure . j~, •. j 2t3 25 ':?5F) J5 ;~11:~ 6 00 1100 , . ssoo - 2?3 1 ~' 0 30 u55i) ~ ° 10~i) 6 50 t~Ci 1 ' . 1 ~ 0 ~ 310 35:;0 s0 1'70 7.00 1 € Ot~ sooo :;"' ~: ~ 10 3'50 3'€ ~i • y0 7 50 1 '€ 00 : . ' 30 ~ 10 8.00 I 00 1 w zsoo ~ ~~ ':800 8 50 110; . ~~ 2;00 9 00 1100 ~ . rn zooo ~8 200 9.50 1 i)00 ~ : ~2 ~~00 10 00 ~ 1 w . eC ~5~ d ~saa ~ 00 80 "'?00 €;~ ;~01 ~3 sooo .. . N ~3 ;s":10 72 3~¢ 10 500 `~ ~ ~} ; ,;; f 0 0 1 2 3 4 5 6 7 0 5 1 0 1 5 2 0 2 5 30 ~ ~~C ASING TE Ba ST rrels ~• LEA K-OFF TES T S hut-I O P n tim IT Poi e, M nt inute s Volume PUm ed Volume Bled Back Volume PUm ed Volume Bled Back 6.4 bls 5. ~ B Is 2. bls 3.0 Bb s Comments: V-LV LVI IV-GV-LVVV_V GI 1-J-I.AIa Summary Re: 1 C-28 casing leak out bottom of shoe Subject:: Re: 1 C-28 casing leak outbottom of shoe From: Thomas Maunder <tom_maunder@admin.state.ak.us=~ Dater Thu, 27 Oct 2005 10:53:36 -4804 ~ ~ - \ ~ ~--~ '1'0: "E3illir~~sle~, Tiir~ %1" <-Tir~~.i~.t3illin~slwra e.onocopt~illips.com== Tim, Your assessment is reasonable. Good luck with the continuing operations. Send a message if further issues develop. Tom Maunder, PE AOGCC Billingsley, Tim A wrote, On 10/27/2005 10:49 AM: Tom, On 1C-28, the 7-5/8" cement job went well but we stopped the displacement at the calculated volume plus 1/2 of the shoe track without bumping the plug. (There was 14,781' of 7-5/8" casing so a large displacement volume of 654 bbls. If the mud pump efficiency was a little off, then the calculated displacement volume might have been a little short) The drilling assembly drilled up cement and plug from 14,598' to 14,670', just above the float collar at 14,691'. The casing was tested at this point and the 3500 psi test pressure leaked to appx 1200 psi in 30 min. A 7-5/8" test packer was run to 14,660' MD (the float collar is at 14691' and float shoe at 14,781') and tested the 7-5/8" good to 3500 psi above 14,660'. The leak must be going out the bottom of the shoe. The problem probably occurred because we did not bump the plug on the cement job and then drilled up the plug and cement from 14,598' to 14,670' before testing the casing. There might be small channel on the high side of the inside of the 7-5/8" casing due to the 73 degree hole angle. This allowed the test pressure to exit out the bottom of the shoe and into the contaminated rathole and into the formation between the shoe at 14,781' and the TD of the 9-7/8" hole at 14,800'. As we discussed yesterday, we will proceed with drilling out the rest of the cement inside the 7-5/8" shoe track and 20' on new formation. Then perform a FIT to 12.5 ppg EMW and proceed with drilling the production hole. We should have pressure tested the casing before drilling up any cement or the top plug and then probably would have obtained a good casing test. Tim Billingsley 265-6531 1 of 1 10!2712005 10:53 AM r • r ~,, ~~ (fib, s ~ ~ FRANK H. MURKOWSKI, GOVERNOR ~` LaLQ-7~ OII< t7usi/ ~ 333 W. 7'"' AVENUE, SUITE 100 CO1~T5ERQATIOI~T COrIl-II5SIOlY ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Randy Thomas Greater Kuparuk Area Drilling Team Leader ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, Alaska 99510-0360 Re: Kuparuk 1C-28 ConocoPhillips Alaska, Inc. Permit No: 205-104 Surface Location:. 1549' FNL, 1114' FWL, SEC. 12, T 11 N, R l OE, UM Bottomhole Location: 647' FNL, 1490' FWL, SEC. 16, T11N, R11E. UM Dear Mr. Thomas: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty- four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659- 3607 (pager). DATED this day of July, 2005 cc: Department of Fish 8v Game, Habitat Section w/ o encl. Department of Environmental Conservation w/o encl. ConocoPhillips ~ Alaska Post Office Box 100360 Anchorage, Alaska 99510-0360 Randy Thomas Phone (907) 265-6830 Email: Randy.L.Thomas@conocophillips.com July 1, 2005 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Re: Application for Permit to Drill, Kuparuk Producer, 1C-28 Dear Commissioners: ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore production well, a horizontal well in the Kuparuk ~~C4/C3" sands.'The well will be designated as 1C-28. Please find attached for the review of the Commission a Form 10-401 and the information required by 20 ACC 25.005 for this well. The expected spud date of iC-28 is July 25, 2005. If you have any questions or require any further information, please contact Tim Billingsley at 265-6531. Sincerely, ~,~~i~~---- Randy Thomas Greater Kuparuk Area Drilling Team Leader STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 r 'Z.~,~ roS 1a. Type of Work: Drill / Redrill 1b. Current Well Class: Exploratory Development Oil / Multiple Zone ^ Re-entry ^ Stratigraphic Test ^ Service ^ Development Gas ^ Single Zone Q 2. Operator Name: 5. Bond: / Blanket Single Well 11. Well Name and Number: ConocoPhillips Alaska, Inc. Bond No. 59-52-180 ~ 1C-28 3. Address: 6. Proposed Depth: 12. Field/Pool(Sj: P.O. Box 100360 Anchorage, AK 99510-0360 MD: 18953' ~ TVD: 6570' ~ Kuparuk River Field 4a. Location of Well (Governmental Section): 7. Property Designation zsw~9 -~ ~~c ~~~ ~,>: Surface: 1549' FNL; 1114' FWL, Sec. 12, T11 N, R10E, UM ~ -. ADL 28242, 2243, 28244 Kuparuk Oil Pool Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 314' FNL, 2449' FEL, Sec. 17, T11 N, R11 E, UM ALK 2292, 3814, 229: 7/25/2005 Total Depth: 9. Acres in Property: 14. Distance to 647' FNL, 1490' FWL, Sec. 16, T11 N, R11 E, UM 1920 Nearest Property: 647' from KRU Bndr) 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation 15. Distance to Nearest Surface: x- 562121 y- 5968688 Zone- 4 (Height above GL): 4U' RKB feet Well within Pool: 1 C-21 @ , 799' " 16. Deviated wells: Kickoff depth: 600 ' ft. 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.os5) Maximum Hole Angler 92° deg Downhole: 3219 psig Surface: 2497 psig 18. Casing Program S if ti Setting Depth Quantity of Cement Size pec ica ons Top Bottom c. f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 24" 16" 62.6# H-40 Welded 76' 40' 40' 116' 116' 9 cu yds High Early 13.5" 10.75" 45.5# L-80 BTC 9129' 40' 40' 9129' 4513' 1070 sx ASLite, 570 sx LiteCrete 9-7/8" 7-5/8" 29.7# L-80 BTCM 14983' 40' 40' 14983' 6464' 240 sx Class G 6.75" 4.5" 12.6# L-80 IBT 4120' 14833' 6453' 18953' 6570' slotted liner 19 PRESENT WELL CONDITION SUMMARY (To be com pleted for Redrill and Re-Entry Operations) Total Depth MD (ff): Total Depth TVD (ft): Plugs (measured) Effective Depth MD (ft): Effective Depth TVD (ff): Junk (measured) Casing Length Size Cement Volume MD ND Structural Conductor Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth ND (ft): 20. Attachments: Filing Fee ^/ BOP Sketch Drilling Program / Time v. Depth Plot Shallow Hazard Analysis Property Plat ^ Diverter Sketch ^ Seabed Report ^ Drilling Fluid Program ^/ 20 AAC 25.050 requirements ^/ 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Tim Billingsley @ 265-6531 Printed Name Randy Thomas Title Greater Kuparuk Area Drilling Team Leader Signature l ( Phone Z.(oS"6z3 3d Date 7 ~S/'~ j Pr h ll Commission Use Only Permit to Drill API Number: Permit Approval See cover letter -7~~ Number: G-~-•':~ ~ ~~ ~~ 50- ~~ ~~ " Z ~ ~ ~C - ~'~? ,~ Date: 7~ / Q 5 for other requirements Conditions of approval mple required Yes ^ No ~ Mud log required Yes ^ No H n sulfide measure s Yes ~ No ^ Directional survey required Yes ,®' No ^ + c~ Other. ,M~ ~ vv~v v-t ~~ ~C ~~~, / APPROVED BY f h ` Approved b : THE COMMISSION Date: ~ ~/ / Form 10-401 Revised 06!2004 ~ }-(~ ubmit in Duplicate. ~plication for Permit to Drill, Well 1 C-28 Revision No.O Saved: 1-Jul-05 Permit It - Kuparuk Well #1 C-28 •~~~° r.w +'~ Application for Permit to Drill Document r~;; ~'~It~Well M p x i m i a p 1M~11 ~lolue Table of Contents 1. Well Name ................................................................................................................. 2 Requirements of 20 AAC 25.005 (fl ....................................................................................................... 2 2. Location Summary ................................................................................................... 2 Requirements of 20 AAC 25.005(c)(2) ................................................................................................... 2 Requirements of 20 AAC 25.050(b) ....................................................................................................... 3 3. Blowout Prevention Equipment Information ......................................................... 3 Requirements of 20 AAC 25.005(c)(3) ................................................................................................... 3 4. Drilling Hazards Information ................................................................................... 3 Requirements of 20 AAC 25.005 (c)(4) .................................................................................................. 3 5. Procedure for Conducting Formation Integrity Tests ........................................... 3 Requirements of 20 AAC 25.005 (c)(5) .................................................................................................. 3 6. Casing and Cementing Program ............................................................................ 4 Requirements of 20 AAC 25.005(c)(6) ................................................................................................... 4 7. Diverter System Information ................................................................................... 4 Requirements of 20 AAC 25.005(c)(7) ................................................................................................... 4 8. Drilling Fluid Program ............................................................................................. 5 Requirements of 20 AAC 25.005(c)(8) ................................................................................................... 5 Sun`ace Hole Mud Program (extended bentonite) .................................................................................. 5 Intermediate Hole Mud Program (LSND) ............................................................................................... 5 Lateral Mud Program (MI FloPro) ........................................................................................................... 5 9. Abnormally Pressured Formation Information ..................................................... 6 Requirements of 20 AAC 25.005 (c)(9) .................................................................................................. 6 10. Seismic Analysis ..................................................................................................... 6 Requirements of 20 AAC 25.005 (c)(10) ................................................................................................ 6 11. Seabed Condition Analysis ..................................................................................... 6 Requirements of 20 AAC 25.005 (c)(11) ................................................................................................ 6 1C-28 PERMIT IT.doc Page 1 of 8 Printed: 1-Jul-05 ORIGINAL ~lication for Permit to Drilt, Well 1 C-28 Revision No.O Saved: 1-Jul-05 12. Evidence of Bonding ............................................................................................... 6 Requirements of 20 AAC 25.005 (c)(12) ................................................................................................ 6 13. Proposed Drilling Program ..................................................................................... 7 Requirements of 20 AAC 25.005 (c)(13) ................................................................................................ 7 14. Discussion of Mud and Cuttings Disposal and Annular Disposal ....................... 8 Requirements of 20 AAC 25.005 (c)(14) ................................................................................................ 8 15.Attachments ............................................................................................................. 8 Attachment 1 Directional Plan ................................................................................................................ 8 Attachment 2 Drilling Hazards Summary ............................................................................................... 8 Attachment 3 Cement Summary ........................................................................................................... 8 Attachment 4 Well Schematic ............................................................................................................... 8 1. Well Name Requirements of 20 AAC 25.005 (fl Each well must be identified by a unique name designated by the operator and a unique API number assigned by the commission under 20 AAC 25.040(b). For a well with multiple well branches, each branch must similarly be identified by a unique name and API number by adding a suffix to the name designated for the well by the operator and to the number assigned to the welt by the commission. The well for which this Application is submitted will be designated as 1C-28. 2. Location Summary Requirements of 20 AAC 25.005(c)(2) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (2) a plat identifying the property and the property s owners and showing (A)che coordinates of the proposed location of the well at the surface, at the top of each objective formation, and at total depth, referenced to governmental section lines. (8) the coordinates of the proposed location of the well at the surface, referenced to the state plane coordinate system for this state as maintained by the National Geodetic Survey in the National Oceanic and Atmospheric Administration; (C) the proposed depth of the well at the top of each objective formation and at total depth; Location at Surface 1549` FNL 1114' FWL Section 12 T11N R10E UM ASP Zone 4 NAD 27 Coordinates ' RKB Elevation 102' AM SL Northings: 5,968,688 ' Eastings: 562,121 Pad Elevation 60` AMSL Location at Top of Productive Interval (7- 314' FNL, 2449' FEL Section 17, T11N, R11E, UM ~ 5/8" shoe near top Ku aruk "C4" Sand ASP Zone 4 NAD 27 Coordinates Measured De th, RKB: 14,983 Northings: 5,964,752 Eastings: 574,081 Total Vertical De th, RKB: 6 464 Total Vertical De th SS: 6 362 Location at Total De th 647' FNL, 1490' FWL, Section 16 T11N RilE UM ' ASP Zone 4 NAD 27 Coordinates Measured De th, RKB: 18 953 Northings: 5,964,459 Eastings: 578,024 Total Vertical De th RKB: 6 570 ' Total Vertical De th, SS: 6 468 and 1C-28 PERMIT IT.doc Page 2 of 8 ` ~ Printed: 1-Jul-05 • ~lication for Permit to Drill, Well 1 C-28 Revision No.O Saved: 1-Jul-05 (D) other information required by 20 AAC 25.050(6); Requirements of 20 AAC 25.050(6) If a well is to be intentionally deviated, the application for a Permit to Drill (Form 10-401) must (1) include a plat, drawn to a suitable scale, showing the path of the proposed wellbore, including all adjacent wellbores within 200 feet of any portion of the proposed well; Please see Attachment 1: Directional Plan and (2) for all wells within 200 feet of the proposed wellbore (A) list the names of the operators of those wells, to the extent that those names are known or discoverable in public records, and show that each named operator has been furnished a copy of the application by certified mail; or (l3) state that the applkant is the only affected owner. The Applicant is the only affected owner. 3. Blowout Prevention Equipment Information Requirements of 20 AAC 25.005(c)(3) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on F/e with the commission and identified in the application: (3) a diagram and description of the blowout prevention equipment (BOPE) as required by 20 AAC 25.035, 20 AAC 25.03&, or 20 AAC 25.037, as applicable; An API 13-5/8" x 5,000 psi BOP stack will be utilized to drill and complete well 1C-28. Please see information on the Doyon Rig 15 blowout prevention equipment placed on file with the Commission. 4. Drilling Hazards Information Requirements of 20 AAC 25.005 (c)(4) An application for a Permit to Dri// must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (4) information on drilling hazards, including (A) the maximum downhole pressure that maybe encountered, criteria used to determine it, and maximum potential surface pressure based on a methane gradient; The expected reservoir pressures in the Kuparuk sands in the iC-28 area vary from 0.38 to 0.49 psi/ft, or -~' 7.3 to 9.4 ppg EMW (equivalent mud weight). These pressures are predicted based on actual bottom hole pressure data from the nearby Kuparuk wells. The maximum potential surface pressure (MPSP) based on the above maximum pressure gradient, a methane gradient (0.11) and the deepest planned vertical depth of the Kuparuk sand formation is 2,493 psi, calculated thusly: MPSP =(6,570 ft)(0.49 - 0.11 psi/ft) = 2,497 psi (8) data on potential gas zones; The well bore is not expected to penetrate any gas zones. ~ and (C) data concerning potential causes of hole problems such as abnormally geo-pressured strata, lost circulation zones, and zones that have a propensity for differential sticking; Please see Attachment 2: Drilling Hazards Summary. 5. Procedure for Conducting Formation Integrity Tests Requirements of 20 AAC 25.005 (c)(5) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (5) a description of the procedure for conducting formation integrity tests, as required under 20 AAC 25.030(f); 1C-28 PERMIT IT.doc Page 3 of 8 Printed: 1-Jul-05 ORIGINAL ~lication for Permit to Drill, Well 1 C-28 Revision No.O Saved: 1-Jul-05 A procedure is on file with the commission for performing LOT's. For iC-28 the procedure will be followed with one exception. The surface casing shoe will be pressured until leak-off occurs and the 16.0 ppg EMW maximum will not be observed. (see step 6 in the procedure) 6. Casing and Cementing Program Requirements of 20 AAC 25.005(c)(6) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (6) a complete proposed casing and cementing program as required by 20 AAC 25.030, and a description of any slotted liner, pre- perforated liner, or screen to be installed; Casing and Cementing Program See also Attachment 3: Cement Summa Hole Top Btm Csg/Tbg Size Weight Length MD/TVD MD/TVD OD (in) in) /b/ft Grade Connection ft) ft) (ft) Cement Program 16 24 62.58 H40 We{ded 76 ~4 J ~.~0'/ 1~ Cemented to ,~~,-~ ;r" ,~~ ~ / / ~ ~~~ surface with 9 cu yd High Earl 10-3/4 13-1/2 45.5 L-80 BTC 9129 34 /,34, 9129 /4513 Cemented to ~~ k~, ~~~ Surface with 1070 sx ASLite Lead, 570 sx LiteCRETE Tail 7-5/8 9-7/8 29.7 L-80 BTCM 14983 ~"/l34 14983 / 6464 Cement Top ~ta ~~1~ planned @ ' 14133 MD / 6286' TVD. Cemented w/ 240 sx Class G + additives 4-1/2 6-3/4" 12.6 L-80 IBT 4120 14833 / 6453 18953 / 6570 Slotted- no slotted Lateral. cement 7. Diverter System Information Requirements of 20 AAC 25.005(c)(7) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (7) a diagram and description of the diverter system as required by 20 AAC 25.035, unless this requirement is waived by the commission under 20 AAC 25.035(h)(2); A 21-1/4", 2000 psi annular with a 16"diameter diverter line will be the diverter system used in the drilling of iC-28. Please see diagrams of the Doyon 15 diverter system on file with the Commission. 1C-28 PERMIT IT.doc Page 4 of 8 Q ~ ~ ~ ~ ~ ~ ~ Printed: 1-Jul-05 i ~lication for Permit to Drill, Well 1C-28 Revision No.O Saved: 1-Jul-05 8. Drilling Fluid Program Requirements of 20 AAC 25.005(c)(8) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (8) a drilling fluid program, including a diagram and description of the drilling fluid system, as required by 20 AAC 25.033; Drilling will be done with muds having the following properties over the listed intervals: Surface Interval Drilling Fluid System Spud Mud INTERVAL MUD PROPERTIES Properties'. Spud to Base of Permafrost Base of Permafrost to TD Initial Value Finat Value Initial Value Final Value Density (ppg) 8.5 - 8.6 9.4 - 9.6 9.4 - 9.6 9.6-10.2 Funnel Viscosity (seconds) 250 - 300 250 - 300 200 - 250 200 -250 Yield Point (cP) 50 - 80 50 - 80 30 - 60 30 - 60 Plastic Viscosity (Ib/100 sf) 8 - 15 11 - 22 12 - 30 12 - 30 10 sec Gels (Ib/100 sf) 15 - 30 15 - 30 15 - 30 15 - 30 10 min Gels (Ib/100 sf) 25 - 55 25 - 55 25 - 65 25 - 65 pH 8.5 - 9.5 8.5 - 9.5 8.5 - 9.5 8.5 - 9.5 API Filtrate(cc) $-15 <8 <$ <6 Solids(°lo) 5-8 5-8 5-8 6-10 Intermediate Interval Drilling Fluid System LSND INTERVAL MUD PROPERTIES Properties Initial Value Final Value through HRZ Density (ppg) 9.4 - 9.5 9.6 - 10.0 Funnel Viscosity (seconds) 35 - 41 38 - 45 Yield Point (cP) 24 - 30 24 - 30 Plastic Viscosity (Ib/100 sf) 10 - 15 15 - 20 Chlorides <600 <600 pH 9-9.5 9-10 API filtrate <6 4 - 5 HTHP filtrate <10 <10 MBT <20 <20 Solids ppb <11 <12 1C-28 PERMIT IT.doc Page 5 of 8 Printed: 1-Jul-05 • ~lication for Permit to Drill, Well 1 C-28 Revision No.0 Saved: 1-Jul-05 Production Drilling Interval Drilling Fluid System Flo Pro Drill-in Fluid PRODUCTION INTERVAL MUD PROPERTIES Kuparuk Sand Properties Initial Value Density (ppg) 9.2-9.5 Funnel Viscosity (seconds) 35 - 45 Yield Point (cP) 20 - 30 Plastic Viscosity (Ib/100 sf) 10 - 15 Chlorides <ti00 pH 9 - 9.5 API filtrate <6 HTHP filtrate <10 MBT <5 Solids ppb <3 Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. Please see information on file with the Commission for diagrams and descriptions of the fluid system of Doyon Rig 15. 9. Abnormally Pressured Formation Information Requirements of 20 AAC 25.005 (c)(9) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (9) for an exploratory or stratigraphic test well, a tabulation setting out the depths of predicted abnormally geo-pressured strata as required by 20 AAC 25.033(f); Not applicable: Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis Requirements of 20 AAC 25.005 (c)(10) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (i 0) for an exploratory or stratigraphic test well, a seismic refraction or reflection analysis as required by 20 AAC 25.061(a); Not applicable: Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis Requirements of 20 AAC 25.005 (c)(11) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (i 1) for a well drilled from an offshore platform, mobile bottom-founded structure, jack-up rig, or floating drilling vessel, an analysis of seabed conditions as required by 20 AAC 25.061(b); Not applicable: Application is not for an offshore well. 12. Evidence of Bonding Requirements of 20 AAC 25.005 (c)(12) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (12) evidence showing that the requirements of 20 AAC 25.025 {Bonding}have been met; Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 1C-28 PERMIT IT.doc Page 6 of 8 Printed: 1-Jul-05 ORIGINAL ~plication for Permit to Drill, Well 1C-28 Revision No.O Saved: 1-J u1-05 13. Proposed Drilling Program Requirements of 20 AAC 25.005 (c)(13) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: The proposed drilling program is listed below. Please refer also to Attachment 4, Well Schematics. 1. Move in /rig up Doyon Rig 15. Install 21-1/4" Annular with 16"diverter line and function test. 2. Spud and directionally drill 13-1/2" hole to casing point as per directional plan. Run MWD tools as required for directional monitoring. 3. Run and cement 10-3/4", 45.5#, L80, BTC casing to surface. Displace cement with mud. Perform top job if required. 4. Remove diverter system, install and test 13-5/8" x 5,000 psi BOP's and test to 5000 psi (annular preventer to 3500 psi) Notify AOGCC 24 hrs before test. "--"" 5. PU 9-7/8" bit and 6-1/4"drilling assembly, with MWD, LWD (GR/RES) & PWD. RIH, clean out cement to top of float equipment. Pressure test casing to 2500 psi for 30 minutes and record results. 6. Drill out cement and between 20' and 50' of new hole. Perform formation integrity test to leak off, recording results. Do not exceed 18.0 ppg EMW. 7. Directionally drill to 7-5/8" casing point as per directional plan. 8. Run 7-5/8", 29.7# L80, BTC Mod casing to surface. Pump cement and displace with mud. 9. Install wellhead 7-5/8" packoff and test to 5000 psi. 10. Flush 10-3/4" x 7-5/8"annulus with water, followed by diesel. 11. PU 6-3/4" PDC Bit and 4-3/4"drilling assembly, with MWD, and LWD (GR/RES/DENS-NEU) logging tools. RIH, clean out cement to top of float equipment. Pressure test casing to 3500 psi for 30 minutes and record results. 12. Drill out cement and between 20' and 50' of new hole. Displace hole to lateral drilling mud. Perform formation integrity test to leak off, recording results. Do not exceed 16.0 ppg EMW. 13. Directionally drill 6-3/4" hole to TD as per directional plan. 14. POOH, back reaming out of lateral. POOH. 15. PU and run 4-1/2" slotted liner with swell packers as needed. 16. Set liner hanger and ZXP liner top isolation packer. Release hanger running tool. POOH. 17. POOH, laying down drill pipe as required. 18. P/U and run 4-1/2" completion equipment with dummied GLMs and one shear out valve in GLM, RIH to depth. Circulate corrosion inhibited brine into the 4-1/2" x 7-5/8"annulus. 19. Land tubing. Set BPV. 20. Nipple down BOPE, nipple up tree and test. 21. Shear out valve in GLM, freeze protect the tubing and IA with diesel. 22. Move rig off. 23. Pull BPV. Change out shear valve for dummy valve. MITIA. 24. Set live gas lift valves in mandrels. 25. Flow back well to portable test separator to clean up well. 26. Secure well for facility hook-up. 1C-28 PERMIT IT.doc Page 7 of 8 ®a ~ ~ ~ ~ ~ ~ Punted: 1-Jul-05 v ~plication for Permit to Drill, Well 1 C-28 Revision No.O Saved: 1-Jul-05 14. Discussion of Mud and Cuttings Disposal and Annular Disposal Requirements of 20 AAC 25.005 (c)(14) An application for a Permit to Drill mustc be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (14) a general description of how the operator plans to dispose of drilling mud and cuttings and a statement of whether the operator intends to request authorization under 20 AAC 25.080 for an annular disposal operation in the well.; Waste fluids generated during the drilling process will be disposed of either by pumping authorized fluids into a permitted annulus on 1C Pad, or by hauling the fluids to a KRU Class II disposal weN. All cuttings generated will be disposed of either down a permitted annulus on 1C Pad, hauled to the Prudhoe Bay Grind and Inject Facility for temporary storage and eventual processing for injection down an approved disposal well, or stored, tested for hazardous substances, and (if free of hazardous substances) used on pads and roads in the Kuparuk area in accordance with a permit from the State of Alaska. ConocoPhillips Alaska may in the future request authorization for the use of this well for annular disposal operations. 15. Attachments Attachment 1 Directional Plan Attachment 2 Drilling Hazards Summary Attachment 3 Cement Summary Attachment 4 Well Schematic 1C-28 PERMIT ITdoc Page 8 of 8 n ~ Printed: 1-Jul-05 s • 1C-28 Drilling Hazards Summary 13-1/2" Hole / 10-3/4" Casino Interval Event Risk Level Miti ation Strate Broach of Conductor Low Monitor cellar continuously during interval. Gas Hydrates Moderate If observed -control drill, reduce pump rates, reduce drillin fluid tem eratures Additions of Lecithin. Gravel /Sand Sloughing Moderate Increase mud weight /viscosity, High viscosity sweeps. Monitor fill on connections Hole Swabbing/Tight Hole on Trips Moderate Circulate hole clean prior to trip. Proper hole fill (use of tri sheets Pum in out of hole as needed. Lost Circulation Low Prevent by keeping hole clean. If losses occur -reduce pump rates and mud rheology, use LCM 9-7/8" Hole / 7-5/8" Casino Interval Event Risk Level Miti ation Stra Shale stabili in HRZ and K-1 Low Control with hi her MW and ro er drillin radices. High ECD and swabbing with Moderate Condition mud prior to trips. Monitor ECD's with .PWD higher MW's required tool while drilling across pay interval. Pump and rotate out on tri s as a last resort. Abnormal Reservoir Pressure Low Follow mud weight schedule and do not faN behind. ~ Stripping Drills, Shut-in Drills, PWD Tools, Increased mud weight as needed. Ensure adequate kick tolerance prior to drillin a interval. Lost Circulation Low Use PWD to monitor hole cleaning. Reduced pump rates, Mud rheology, LCM. Use GKA LC decision tree. 6-3/4" Hole / 4-1/2" Liner Interval Event Risk Level Miti ation Strate Trouble Sliding /Steering Moderate Bit/BHA design will take into account historical problems in offset horizontal wells with steering. Rotary steerable assembly will be used unless equipment failures occur. LOTAD's friction reduction devieces will be useded. Water based Mud lubricants will be used. Differential Sticking Moderate Periodic wiper trips. Do not leave pipe static for extended period of time. Lube pills will be ready to be spotted if a stuck i e incidents occurs. Difficulties getting liner to bottom Moderate Torque/drag will be monitored while drilling the interval. with swell packers Pump out of hole on final trip out prior to running liner to ensure hole is clean. Utilize torque rings to allow rotation of liner. S of Tube ills in o en and cased hole if needed. Lost Circulation Moderate Use PWD to monitor hole cleaning. Reduced pump rates, Mud rheology, pre-treat with LCM prior to drilling fault crossings. Use LC decision tree designed for production laterals. An extensive LC strategy will be documented in the well plan. 1 C-28 Drilling Hazards Summary.doc prepared by Tim Billingsley 6/29/05 ORIGINAL ~~d Rig: DOYON 15 Location: KUPARUK Client: CPAI. Revision Date: 6/30/2005 Prepared by: C. Akwukwaegbu Location: Anchorage, AK Phone: (907) 263-4247 Mobile: (907) 830-8168 Email: cakwukwaegbu@slb.com ~ < TOC at Surface f_ I Previous Csg. < 16", 62.6# casing at 78' MD < Base of Permafrost at 1,956' MD (1,818' TV D) < Top of Tail at 6,639' MD 1 i ,~j < 10 3/4", 45.5# casing in 13 1/2" OH ~~ TD at 9,129' MD '~ (4,513'TVD) Mark of Schlumberger CemCADEF Preliminary Job Design 10 3/4" Surface reliminary Job Design based on limited input data. For estimate purposes onl Schlumberger Volume Calculations and Cement Systems Volumes are based on 250°!o excess in the permafrost and 35°lo excess below the permafrost. The top of the tail slurry is designed to be at 6,639' MD. Lead Slurry Minimum pump time: 390 min. (pump time plus 90 min.) ARCTICSET Lite @ 10.7 ppg - 4.45 ft3/sk 0.6381 ft3/ft x (78') x 1.00 (no excess) = 49.8 ft3 0.3637 ft3/ft x (1956' - 78') x 3.50 (250% excess) = 2391.1 ft3 0.3637 ft3/ft x (6639' -1956') x 1.35 (35% excess) = 2299.2 ft3 49.8 ft3 + 2391.1 ft3+ 2299.2 ft3 = 4740.1 ft3 4740.1 ft3 / 4.45 ft3/sk = 1065.2 sks Round up to 1070 sks Have 270 sks of additional Lead on location for Top Out stage, if necessary. Tail Slurry Minimum pump time: 270 min. (pump time plus 90 min.) LiteCRETE @ 12.5 ppg - 2.24 ft3/sk 0.3637 ft3/ft x (9129' - 6639') x 1.35 (35% excess) = 1222.7 ft3 0.5400 ft3/ft x 80' (Shoe Joint) = 43.2 ft3 1222.7 ft3 + 43.2 ft3 = 1265.9 ft3 1265.9 ft3/ 2.24 ft3/sk = 565.1 sks Round up to 570 sks BHST = 100°F, Estimated BHCT = 90°F. (BHST calculated using a gradient of 2.6°F/100 ft. below the permafrost) PUMP SCHEDULE Pump Rate Stage Stage Time Cumulative Stage Volume Time (bpm) (bbl) (min) (mint CW100 5 50 10.0 10.0 Drop Bottom Plug 15.0 25.0 MudPUSH II 5 50 10.0 35.0 Lead Slurry 7 848 121.1 156.1 Tail Slurry 6 227 37.8 193.9 Drop Top Plug 8.0 201.9 Displacement 7 855 122.1 324.0 Slow Rate 2 15 7.5 331.5 MUD REMOVAL Recommended Mud Properties: 10.1 ppg, Pv < 15, TY < 15. As thin and light as possible to aid in mud removal during cementing. Spacer Properties: 10.5 ppg MudPUSH" II, Pv ~ 17-21, TY ~ 20-25 Centralizers: Recommend 1 per joint across zones of interest for proper cement placement. CF.IGINAL Rig: DOYON 15 Location: KUPARUK Client: CPAI Revision Date: 6/30/2005 Prepared by: C. Akwukwaegbu Location: Anchorage, AK Phone: (907) 263-4247 Mobile: (907) 830-8168 Email: cakwukwaegbu@slb.com Previous Csg. < 10 3/4", 45.5# casing at 9,129' MD < Top of Tail at 14,133' MD < 7 518", 29.7# casing in 9 7/8" OH TD at 14,983' MD (6,462' ND) Mark of Schlumberger CemCADE Preliminary Job Design ` 7.625" Intermediate Casing reliminary Job Design based on limited input data. For estimate purposes only. Sehlumberger Volume Calculations and Cement Systems Volumes are based on 40% excess. Tail slurry is designed for 850' shoe tack. Tail Slurry Minimum thickening time: 210 min. (Pump time plus 90 min.) 15.8 ppg Class G + 0.2%D46, 0.3%D65, 0.02%6155, 0.40% D167 - 1.16 ft3/sk 0.2148 ft3/ft x 850' x 1.40 (40% excess) = 255.6 ft3 0.2578 ft3lft x 80' (Shoe Joint) = 20.6 ft3 255.6 ft3 + 20.6 ft3 = 276.2 ft3 276.2 ft3/ 1.16 ft3/sk = 238.1 sks Round up to 240 sks BHST = 151 °F, Estimated BHCT = 117°F. (BHST calculated using a gradient of 2.6°F/100 ft. below the permafrost) PUMP SCHEDULE Pump Rate Stage Stage Time Cumulative Stage Volume Time (bpm) (bbll (min) (mini CW100 5 30 6.0 6.0 Drop Bottom Plug 10.0 16.0 MudPUSH II 5 50 10.0 26.0 Tail Slurry 5 50 10.0 36.0 Drop Top Plug 10.0 46.0 Displacement 7 664 94.9 140.9 Slow Rate 3 20 6.7 147.6 MUD REMOVAL Recommended Mud Properties: 10.6 ppg, Pv < 15, TY < 15. As thin and light as possible to aid in mud removal during cementing. Spacer Properties: 12.5 ppg MudPUSH* II, Pv ~ 19-22, TY ~ 22-29 Centralizers: Recommend 1 per joint across zones of interest for proper cement placement. ''?IGINAL 1C-28 Horizont~INell Base Case Proposed Completion Schematic ConocoPhillips 4-1 /2" FMC Gen V Tubing Hanger, 4-1/2" L-80 IBT pin down (Special Drift to 3.91") 4-1/2" 12.6# L-80 IBT Spaceout Pups as Required (Special Drift to 3.91") 4-1/2" 12.6# L-80 lBT Tubing to Surface {Special Drift to 3.91") 4-112" Camco'DB' nipple w/ 3.875" No-Go Profile set at +/- 500' MD 4-1/2" 12.6# L-80 IBT tubing to landing nipple (Special Drift to 3.843") 4-1/2" x 1" Camco'KBG-2' Mandrels w/ DV's (Max. OD 5.984", ID 3.833") Spaced out w/ 4-1/2" 12.6# L-80 IBT tubing (Special Drift to 3.843") as follows: 16" conduc 78' BGL Surface csg. 10-3/4" 45.5# L-80 BTC Special Drift - 9.875" 9129' MD / 4513' TVD (200' TVD below Base West Sak) Intermediate csg. 7 5/8" 29.7# L-80 BTCM 14983' MD / 6464' TVD (App. 50' MD below top of C4) Liner Assembly -Hanger Set +/- 150' above intermediate csg shoe Baker 5'/z" x 7 5/8" `ZXP' Liner Top Isolation Packer w/ HRD running profile Baker 5'/s" x 7 5/8" RS Nipple Baker 5 %' x 7 5/8" `Flexlock' Liner Hanger Baker 190-47 Casing Seal-Bore Receptacle (4.75" Polished Bore) 4'/z' 12.6# L-80 IBT alternating slotted and blank pipe w/ swell packers (installation of blank pipe & swell pkrs TBD with well logs) 4 %i' ROT `Silver Bullet' Shoe GLM # TVD-RKB MD-RKB 1 2600 3733 2 3800 7120 3 4700 9660 4 5400 6861 5 5925 11633 6 6253 14050 4-1/2" Camco'DB' nipple w/ 3.813" No-Go Profile set @ bottom of tangent section +/- 14,100 MD / 6275' TVD, 69.24 deg 4-1/2" 12.6# L-80 IBT tubing from 'DB' nipple to sliding sleeve (Special Drift to 3.843") 1 jt 4-1/2" 12.6# L-80 IBT tubing (Special Drift to 3.843") 4.75" OD Baker casing seal assembly w/ 17 Ft. stroke, 4-1/2" 12.6 # L-80 IBT box up (landed 3-4' off fully landed position) 4 %2' x 6.3" Swell Packers for isolation of potentially conductive faults or wet intervals Slotted Liner 4-1/2" 12.6# L-80 IBT ~ZIGINAL Tim Billingsley 6!17/05 C4/C3 Lateral to 18,953' MD • ConocoPhillips Alaska ConocoPhillips Alaska (Kuparuk) Kuparuk River Unit Kuparuk 1C Pad Plan 1 C-28 (wp10) Pian: 1C-28 (wp10) Proposal Report 15 June, 2005 HALL.1l3l.~RTQN Sperry Drilling Services OnIGINAL O ^~~ V I /~ 1 NALLIBURTON WELL DETAILS: Plan: 1C-28 (wp10) Sperry Drilling Services Ground Level: 0.00 +N/-S +E/-W Northing Easting Latittude Longitude Slot 1C-28 ~ 0 00 0.00 5968688.42 562120.78 70°19'29 938N 149°29'46.588W Vertical Section at 90.50° (2000 ft/in) -1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 `'~ ~VI R./~~~'I~~S ~lAS~:r 4000 15000 16000 17000 -2000 -2000 ~~, SHL ~ 1549ft FNL 81114ft FWL -Sec 12 - T11 N - 810E - ----~--~~------~-- _ - - - CASING DETAILS FORMATION TOP DETAN.S -1000 KOP Build ~ 3°/100 (600ftMD, 600ft TVD) ~ No TVD MD Name Size - - - - 1 4513 009129 21 103/4" 10-314 I - NBVDPath MOPath r-onnallori 1 1818.00 1956.36 BasePemrafroat - -1000 . . / 2 6463.554983.00 7 5l8" 7-518 , 2 3236.00 5526.49 Top llgnu Continue Build ~ 4°/100ft,1100ft MD, 1094ft ND ~, 3 6570.008952.68 41/2" 41/2 i r 3 3914.00 7439.29 Top West Sek 4 4313.00 8664.96 Base West Sak ~ - , - 5 6333.0014268.38 Base HRZ 0 ~ - _ _ -_. - - 6 6403.0014523.79 K1 0 - Sail ~ 42.48°Inc 8111.92°Azi : 17998 MD, 1702ft TVD /' - - / 7 6450.0014803.b1 D Shski 8 6461.0014933.67 C4 - 0° - Continue Build ~ 4°I100ft , 2002ft MD, 1852ft TVD 1000 ~ -- - ~ 1000 q0 Sail ~ 69.24°Inc 8111.92°Azi : 2671ft MD, 2224ft TVD __- --- _ _ ~/ _._ - _ - 103/4" Casing - 91298 MD, 4513ft TVD -~ _ \ `g 2000 _~ ~ Pemwirost 2000 Continue Tum ~ 3°/t00ft , 9171ft MD, 45288 TVD Sail @ 87.12°Inc 890.91 °Azi :149528 MD, 6462ft TVD ~ ~ ~ ~ _ T --- ~ ~ 3000 ~ ~~ / 3000 - - - - / N Continue GeoSeering In Cd ,15003ft MD, 6465ft ND I a L Top Ugnu ~ - -- _ nn O1 a ~ ~ 4000 _ / - , ~ 7 SB"Casing -14983ft MD 66464ft TVD / / i 4000 ~ ~ - - - , Top West Sak / \ ~ 1 Passible Fautt 1 Crossing :153508 MD, 6482ft TVD ', _Base West Sak ~ J - o o 0 ~ 5000 ~ / ~ 5000 ~ i= ~ `.~ _ BHL ~ 18953ft MD, 6570ft TVD ~ / __ 6000 ~~ H~ Sail d(,169.24°Inc 8105.79°Azi : 9363ft MD, 4596ft TVD ~ / - - - ~ I1C-28 TB (wp10) ~ - 6000 / ~ ~ m -~-° ---- - -~ _. _ ~.. - ,1 - ~ 41/2'] c° ~ - - ~- -- -_-_ DShale - _ 0 0 7000 K1 7000 '_~ ~, Continue Build ~ 3°/100ft ,14185ft MD, 63051[ Tfup ~I C-28 Tce (wp10) _ 1C-28 Neel (wp10) 8000 iC-2871 (wp10) 8000 REFERENCE INFORMATION 1C-28 M (wp10) 1C-26 T7 (wp10) Co-ordinate (N/E) Reference: Well Plan: 1C-28, True North Vertical (TVD) Reference: Elev: 102 @ 102.OOft (WBP) 1C-28 T3 (ryp10) 9000 Section (VS) Reference: (O.OON, O.OOE) 1C-28 T9 (wp10j ~~ 9000 Measured Depth Reference: Elev: 102 @ 102.OOft (WBP) Calculation Method: Minimum Curvature 1C-28 74 (wp10) 1C-28 T6 (wp10) 1C•28 TS (wp10) -1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 Vertical Section at 90.50' (2000 ftJin) r Project: KuparukRiverUnit HALLIBUF~TON `' ~ ~ Site: Kuparuk 1C Pad _ _ - ConocoPhillips Well: PIan:1C-28 Sperry Drilling Services Wellbore: plan 1C-28 (wp10) Alaska Plan: 1C-28 (wp10) ~~SHL ~ 15498 FNL 81114ft FVVL -Sec 12 - T11 N - 810E ~ i KOP Build ~ 3°/100 (600ftMD, ti00ft ND) 'i ~ ~ ~~ Continue Build ~ 4°I100ft ,1100ft MD,1094ft ND 1800 ~ - - / ~~ ~ Sail ~ 42.48 Inc 8111.92°Azi 1799ft MD,1702ft ND i- - ,.Continue Budd ~ 4°/1008 , 20028 MD,1852ft ND / - __~ 900 ~~ ~ -~ Sail ~ 69.24°Inc 8111.92°Azi : 2671ft MD, 2224ft TVD-~ / - - _ Continue Tum ~ 3°1100ft , 9171ft MD, 45288 ND %~ 0 i ~ '~ Sail (d 69.24Wnc 8105.79°Azi C -1800 0 0 -2700 91298 MD, 4513ft ND 5B" .Sail ~ 87.12%nc 890.91°Azi :14952ft MD, 64628 ND - - - - o \ L O Z -360C L_ 7 O (~ __..... T M Azimuths to True North Magnetic North: 24.34° Magnetic Field Strength: 57604.6n1 Dip Angle-. 80.77° Date: 6/10/200` Model: BGGM2004 '.Continue Build @ 3°I100ft ,14185ft MD, 6305ft NDT- In Cd,15003ft MD, 6465ft ND 1C-28 Heel (wp10) ~ 1G28 T1(wp10) 1C-28 T2 4596ft ND MD, 6570ft ND - 21 DD PaY (wp10) le'5/8" m ~ c b ~ - /~ ~1C28550'Hardli~~I.~ j I I I ~ ILC-28 Tce (wp10) ', 1C-28 T3 (wp10) ~ 1C-28 T6 (wp10) I 1C-28 T7 (wp10) ~ 1G28 T9 (wpt -7200 - L _ _ ', 1C-28 T4 (wp10) 1C-28 T6 (wp10)1 ~i,1C-28 T8 (wp10) -1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 West(-)/East(+) (2000 ft/in) BHL ~ 18953ft 1C-28 Unk Boundry ~ • HALLIBURTON Project: Kuparvk River Unit -- - --- T Site: KupaRJk 1C Pad MAzimuths to True North $psr-y Drilling Services Well: PIan:1C-28 Magnetic North: 24.34° Wellbore: plan 1C-28 (wp10) Magnetic Field Plan: 1C-28 1~ (~ ) Strength 57604.6nT ° Dip Angle: 80.77 Date. 6/1 OY2005 Sail @ 87.12Wnc 890.91°AZi : 149528 MD, 64628 ND Model: BGGM2004 7 518" Casing -14983ft MD, 66464ft ND -3150 / Possible Fauk 1 C~ g :15350ft MD, 6482ft ND i - - - - - ~ j i c 0 O L r O L 0 C_ O O O L Q 0) _U N N 7 H ~ 1C-28 T5 (wp10) 1G28 T3 (wp10) j 1C-28 Unit Boundry'i - -T - I ° / i 1C-28 T4 (wp10) 1 1G28 T9 (wp10] ~ ~ - j ...- - -- Ol ~ A ° o ° ~ 1G28 550' Radius Hardline 1G28 Tce (wp10) ~ 41/2" 'i I \ ° ~ $ i i 1G28 Heel (wp10)\~~,. 1G28 T~ -- ~ _ ~., ~ i - 10) 1C-21 DD Poly (~r~10) I ~ - Contlnue GeoSteering In C-0,15003k MD, 6465ft ND - 1G28 T7 (wp10) _ __. 1G28 TB (wp10) ! ' BHL ~ 189538 MD, 6570ft ND Possible Fautt 2 Crossing :16245ft MD, 6642ft ND ~ 1G28 T8 (Wp10) 11550 11900 12250 12600 12950 13300 13650 14000 14350 14700 15050 15400 15750 West(-)/East(+) (700 ft/in) CASING ET ~/~ C01 RJ~~~~I~pS ~ No TVD Name Size r~laSl4~ 14513.00 9129.21 103!4" 2 6463.55 14963.00 7 5l8" 10.314 7-5/8 3 6570.00 18952.68 41IT' 4-112 Build ~ 3°I100ft ,14185ft MD, 6305ft P 7518"Casing- K1 ~ n° n FORMATION TOP DETAILS NdVDPath MDPafh Fortretbn 1 1818.00 1966.38 Base Permafrost 2 3236.00 5528.49 Top Ugnu 3 3914.00 7439.29 Top West Sak 4 4313.00 8664.96 Base West Sak b 8333.0014268.38 Base HRZ 8 8403.0014623.79 K1 7 8460.0014803.61 D Shale 8 6481.0014833.57 C4 Sail ~ 87.12°Inc 890.91°Azi :14952ft MD, 64628 ND ~ontinue GeoSteering In C~,15003ft MD, 6465ft TVD 66464ftND / T /~ / Passible Fautt 1 Crossing :15350ft MD, 6482ft ND -. -_ / - _ , // - Possible Fautt 2 C ~'ng : 16245ft MD, 6542ft ND / / /" - / BHL ~ 18953ft MD, 6570ft ND 0 ~ 1G28 Heel (wp10) 1C-28 T7(wp10)ii 1C-28 TZ (wp10) 1G28 T7 (wp10) '.1G28 T9 (wp10) 1C-28 T3 (wp10) - ~ ~------- 1,1C-28 T4 (wp10) i it 1G28 T5 (wp10~ 1G28 T6 (wp10)1 1C-28 TS (wp10)1 1G28 Tce (wp10) 9500 10000 10500 11000 11500 12000 12500 13000 13500 14000 14500 15000 15500 16000 Vertical Section at 90.50° (1000 fl/in) ~ 1-~ Halliburton Company Conoco Phillips Planning Report -Geographic Alaska Database: EDM 2003.11 Single User Db Local Co-ordinate Reference: Company: ConocoPhiNips Alaska (Kuparuk) TVD Reference: Project: Kuparuk River Unit MD Reference: Site: Kuparuk 1C Pad North Reference: Well: Plan: tC-28 Survey Calculation Method: Wellbore: Plan 1C-28 (wp10) Design: 1 C-28 (wp10) • NALLIBURTON Sp®rry Drilling S6~rvices Well Plan: 1G-28 Elev: 102 ~ 102:OOft (WBP) Elev: 102 @ 102OOft (WBP) True Minimum Curvature Project Kuparuk River Unit, North Slope Alaska; United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well Plan: 1 C-28 Well Position +N/-S 0.00 ft Northing: 5,968,688.42 ft Latitude: +E/-W 0.00 ft Easting: 562,120.78 ft Longitude: Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: Wellbore Plan 1C-28 (wp10) Magnetics Model Name Sample Date Declination l°) Dip Angle (°) BGGM2004 6/10/2005 24.34 80.77 Design 1C-28 (wp10) Audit Notes: Version: Phase: PLAN Tie On Depth: Vertical Section: Depth From (TVD) +Nl-S +E/-W Direction (ft) (gj (ft) (°) 102.00 0.00 0.00 90.50 70° 19' 29.938" N 149° 29' 46.588" W 0.00 ft Field Strength (nT) 57, 605 102.00 6/15/2005 1:40:57PM Page 2 of 11 COMPASS 2003.11 Build 48 ORIGINAL • / C Ph lli Halliburton Company i-1ALLIBURTON onoco i ps Planning Report -Geographic Alaska Sperry Drilling Services Database: EDM 2003.11 Single User Db Local Co-ordinate Reference: Well Plan: 1C-28 Company: CopocoPhillips Alaska (Kuparuk) TVD Reference: Elev: f02 @ 102:OOft (WBP) Project: Kuparuk River Unit MD Reference: Elev: 102 @ 102.OOft (WBP) Site: Kupacuk 1C Pad North Reference: True WeII: Plan: 1C-28 Survey Calculation Method: Minimum Curvature Wellbore: Plan 1C-28 (wp1'0) Design: 1C-28{wp10) Plan Summary Measured Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +NI-S +E/-W Rate Rate Rate TFO (ft) (°) (°) (ftj (ft) (ft) (°/100ft) (°/100ft) (°1100ft) (°) 102.00 0.00 0.00 102.00 0.00 0.00 0.00 0.00 0.00 0.00 600.00 0.00 0.00 600.00 0.00 0.00 0.00 0.00 0.00 0.00 1,100.00 15.00 100.00 1, 094.31 -11.30 64.09 3.00 3.00 0.00 100.00 1,485.73 30.00 110.00 1,449.78 -53.20 204.72 4.00 3.89 2.59 19.05 1,799.06 42.48 111.92 1,702.00 -119.77 377.17 4.00 3.98 0.61 6.00 2,002.46 42.48 111.92 1,852.00 -171.06 504.60 0.00 0.00 0.00 0.00 2,671.39 69.24 111.92 2,224.00 -375.92 1,013.56 4.00 4.00 0.00 0.00 9,171.39 69.24 111.92 4,527.95 -2,645.36 6,651.95 0.00 0.00 0.00 0.00 9,362.51 69.24 105.79 4,595.75 -2,703.10 6,820.97 3.00 0.00 -3.21 -91.04 14,184.71 69.24 105.79 6,304.65 -3,930.31 11,160.01 0.00 0.00 0.00 0.00 14,952.08 87.12 90.91 6,462.00 -4,035.43 11,898.36 3.00 2.33 -1.94 -41.00 15,350.63 87.12 90.91 6,482.00 -4,041.73 12,296.36 0.00 0.00 0.00 0.00 15,449.75 89.41 93.51 6,485.00 -4,045.55 12,395.34 3.50 2.30 2.63 48.80 15,644.99 85.90 98.21 6,492.99 -4,065.45 12,589.32 3.00 -1.80 2.41 126.83 15,911.00 85.90 98.21 6,512.00 -4,103.34 12,851.92 0.00 0.00 0.00 0.00 15,989.62 84.71 99.24 6,518.43 -4,115.22 12,929.38 2.00 -1.52 1.31 139.41 16,245.16 84.71 99.24 6,542.00 -4,156.06 13,180.53 0.00 0.00 0.00 0.00 16,400.33 87.15 101.16 6,553.02 -4,183.47 13,332.84 2.00 1.57 1.24 38.30 16,620.93 87.15 101.16 6,564.00 -4,226.12 13,549.00 0.00 0.00 0.00 0.00 16,658.88 87.91 101.17 6,565.64 -4,233.47 13,586.19 2.00 2.00 0.02 0.69 17,079.25 87.91 101.17 6,581.00 -4,314.85 13,998.32 0.00 0.00 0.00 0.00 17,445.14 92.30 89.92 6,580.35 -4,350.15 14,361.82 3.30 1.20 -3.07 -68.73 17,578.52 92.30 89.92 6,575.00 -4,349.97 14,495.10 0.00 0.00 0.00 0.00 17,685.90 90.24 90.54 6,572.62 -4,350.41 14,602.44 2.00 -1.91 0.58 163.19 18,069.60 90.24 90.54 6,571.00 -4,354.04 14,986.13 0.00 0.00 0.00 0.00 18,076.78 90.12 90.47 6,570.98 -4,354.10 14,993.30 2.00 -1.76 -0.95 -151.56 18,560.65 90.12 90.47 6,570.00 -4,358.10 15,477.16 0.00 0.00 0.00 0.00 18,566.48 90.00 90.47 6,569.99 -4,358.15 15,482.99 2.00 -2.00 0.01 179.75 18,952.69 90.00 90.47 6,570.00 -4,361.35 15,869.18 0.00 0.00 0.00 0.00 5/15/2005 1:40:57PM Page 3 of 11 COMPASS 2003.11 Build 48 ~I~1NAL / Halliburton Company Conoco Phillips Planning Report -Geographic Alaska Database: EDM 2003.11 Single User Db Local Co-ordinate Reference: Company; ConocoPhillips Alaska (Kuparuk) TVD Reference: Project: Kuparuk Riuer Unit MD Reference: Site: Kuparuk 1C Pad North Reference: Well: Plan: 1628 Survey Calculation Method: Wellbore: Plan 1C-28 (wp10) Design: 1C-28 (wp10) Geologic Targets Plan 1 C-28 (wp10) • HALLIBURTON Sperry Drilling Services Well P{an: 1C-28 Elev: 102 @ 102:OOft (WBP) Elev: 102 ~102:00ft (WBP) True Minimum Curvature ~~ TVD Target Name +N/-S +E!-W Northing Easting (ft) - Shaae ft ft (ft) (ft) -5,000.00 1C-28 550' Radius Hardline -3,748.96 14,382.06 5,965,059.00 576,532.00 - Circle (radius 550.00) 6,485.00 1C-28 T2 (wp10) -4,045.55 12,395.34 5,964,746.00 574,548.00 - Point -5,000.00 1C-28 Unit Boundry -3,748.96 14,382.06 5,965,059.00 576,532.00 - Polygon Point 1 24.35 2,941.18 5,968,000.00 576,532.00 Point 2 0.00 0.00 5,965,059.00 576,532.00 Point3 1,492.09 -12.35 5,965,059.00 578,024.00 Point4 0.00 0.00 5,965,059.00 576,532.00 6,581.00 1C-28 T6(wp10) -4,314.85 13,998.32 5,964,490.00 576,153.00 - Point 6,564.00 1C-28 TS (wp10) -4,226.12 13,549.00 5,964,575.00 575,703.00 - Point 6,570.00 1C-28 Toe (wp10) -4,361.35 15,869.18 5,964,459.00 578,024.00 - Point 6,575.00 1C-28 T7 (wp10) -4,349.97 14,495.10 5,964,459.00 576,650.00 - Point 6,570.00 1C-28 T9 (wp10) -4,358.10 15,477.16 5,964,459.00 577,632.00 - Point 6,542.00 1C-28 T4 (wp10) -4,156.06 13,180.53 5,964,642.00 575,334,00 - Point 6,482.00 1C-28 T1 (wp10) -4,041.73 12,296.36 5,964,749.00 574,449.00 - Point 6,462.00 1C-21 DD Poly (wp10) -4,298.99 14,377.50 5,964,509.00 576,532.00 - Polygon Point 1 0.00 0.00 5,964,509.00 576,532.00 Point2 1,492.09 -12.35 5,964,509.00 578,024.00 Point3 1,490.85 -162.36 5,964,359.00 578,024.00 Point 4 -1.24 -150.01 5,964,359.00 576,532.00 Points -379.95 -108.87 5,964,397.00 576,153.00 Point 6 -829.33 -27.14 5,964,475.00 575,703.00 Point 7 -1,197.80 42.92 5,964,542.00 575,334.00 Point 8 -1,526.41 95.65 5,964,592.00 575,005.00 Point 9 -1,982.99 153.43 5,964,646.00 574,548.00 Point 10 -2,081.97 157.25 5,964,649.00 574,449.00 Point 11 -2,479.97 163.55 5,964,652.00 574,051.00 Point 12 -2,478.73 313.56 5,964,802.00 574,051.00 Point 13 -2,080.73 307.26 5,964,799.00 574,449.00 Point 14 -1,981.75 303.44 5,964,796.00 574,548.00 Point 15 -1,525.16 245.66 5,964,742.00 575,005.00 Point 16 -1,196.56 192.93 5,964,692.00 575,334.00 Point 17 -828.09 122.87 5,964,625.00 575,703.00 Point 18 -378.81 29.14 5,964,535.00 576,153.00 Point 19 0.00 0.00 5,964,509.00 576,532.00 6,571.00 1C-28 T8 (wp10) -4,354.04 14,986.13 5,964,459.00 577,141.00 - Point 6/15/2005 1:40:57PM Page 10 of 11 COMPASS 2003.11 Build 48 ORIGINAL ~ ~ Ph ll Haliiburton Company MALLIBURTON Conoco i i S p Planning Report -Geographic Alaska Spent' Drilling Services Database: EDM 2003.11 Single User Db Local Co-ordinate .Reference: WeIIPIan: 1C-28 Company: ConocoPhillips Ataska (Kuparuk) TVD Reference: Elev: 102 @ 102OOft WBP) Project: Kuparuk River Unit NID Reference: Elev. 102 @ 102.OOft jWBP) Site: Kuparuk 1C' Pad, North Reference: True Well: Plan: 1C-28 Survey Calculation Method: Minimum Curvature Wellbore: Plan 1C-28;(wp10) Design: 1C-28 (wp10) 6,462.00 1C-28 Heel (wp10) -4,035.43 11,898.36 5,964,752.00 574,051.00 - Point 6,512.00 1G-28 T3 (wp10) -4,103.34 12,851.92 5,964,692.00 575,005.00 - Point -5,000.00 1C-28 550' Hardline -4,298.99 14,377.50 5,964,509.00 576,532.00 - Polygon Point 1 0.00 0.00 5,964,509.00 576,532.00 Point2 1,492.09 -12.35 5,964,509.00 578,024.00 Prognosed Casing Points Prognosed Formation Intersection Points Measured Depth Inclination Azimuth 1,956.36 42.48 111.92 5,526.49 69.24 111.92 7,439.29 69.24 111.92 8,564.96 69.24 111.92 14,268.38 71.15 104.05 14,523.79 77.05 98.96 14,803.51 83.61 93.66 14,933.57 86.69 91.25 Vertical Casing Hole Depth Diameter Diameter 4,513.00 10314 13-1/2 6,463.55 7.5/8 9-718 6,570.00 4-1/2 61/4 Measured Depth (ft) 9,129.21 14,983.00 18,952.68 Vertical Depth +N!-E +E/-W (ft) (ft) (ft) Name 1,818.00 -159.43 475.71 Base Permafrost 3,236.00 -1,372.76 3,490.20 Top Ugnu 3,914.00 -2,040.61 5,149.45 Top WestSak 4,313.00 -2,433.63 6,125.91 Base West Sak 6,333.00 -3,950.57 11,236.07 Base HRZ 6,403.00 -3,999.38 11,476.60 K7 6,450.00 -4,029.55 11,750.43 D Shale 6,461.00 -4,035.09 11,879.87 C4 6/1542005 1:40:57PM Page 11 of 11 COMPASS 2003.11 Build 48 ~ • ~ C Ph ll Halliburton Company A IBlJR ON H LL T onoco i i S p Planning Report -Geographic Alaska Sperry Drilling Services Database: EDM 2003.11 Single User Db Local Co-ordinate Reference: Well Plan: 1 C-28 Company: ConocoPhllips Alaska (Kuparuk) TVD Reference: Elev: 102 @ 102.OOft (WBP) Project: Kuparuk River Unit MD Reference: Elev: 102 @ 192.OOft (WBP) Site: Kuparuk 1CPad North Reference: True Well: Plan: 1C-28 Survey Calculation Method: Minimum Curvature Wellbore: Plan 1C-28 (wp10) Design: 1 C-28 (wp10) Planned Survey 1C-28 (wp10) Map Map MD inclination Azimuth TVD SSTVD +NI-S +E!-W Northing Easting DLSEV Vert Section (ftl (°) (°) (ft) (ftl (ft)- (ft) (ftl (ftl (°/100ft1 (ft) 102.00 0.00 0.00 102.00 0.00 0.00 0.00 5,968,688.42 562,120.78 0.00 0.00 SHL ~ 1549ft FNL 8,1114ft FW L -Sec 12 - T11 N - R10E 200.00 0.00 0.00 200.00 98.00 0.00 0.00 5,968,688.42 562,120.78 0.00 0.00 300.00 0.00 0.00 300.00 198.00 0.00 0.00 5,968,688.42 562,120.78 0.00 0.00 400.00 0.00 0.00 400.00 298.00 0.00 0.00 5,968,688.42 562,120.78 0.00 0.00 500.00 0.00 0.00 500.00 398.00 0.00 0.00 5,968,688.42 562,120.78 0.00 0.00 600.00 0.00 0.00 600.00 498.00 0.00 0.00 5,968,688.42 562,120.78 0.00 0.00 KOP Build ~ 3°M00 (600ftiND, 500ft TVD) 700.00 3.00 100.00 699.95 597.95 -0.45 2.58 5,968,687.99 562,123.36 3.00 2.58 800.00 6.00 100.00 799.63 697.63 -1.82 10.30 5,968,686.69 562,131.10 3.00 10.32 900.00 9.00 100.00 898.77 796.77 -4.08 23.16 5,968,684.53 562,143.97 3.00 23.19 1,000.00 12.00 100.00 997.08 895.08 -7.25 41.10 5,968,681.51 562,161.94 3.00 41.16 1,100.00 15.00 100.00 1,094.31 992.31 -11.30 64.09 5,968,677.65 562,184.95 3.00 64.18 Continue Bu11d ~ 4°/100ft , 1100ft MD, 1094ft TVD 1,200.00 18.83 104.05 1,189.97 1,087.97 -17.47 92.50 5,968,671.72 562,213.41 4.00 92.64 1,300.00 22.71 106.76 1,283.46 1,181.46 -26.95 126.64 5,968,662.52 562,247.63 4.00 126.87 1,400.00 26.63 108.71 1,374.31 1,272.31 -39.71 166.37 5,968,650.09 562,287.45 4.00 166.71 1,485.73 30.00 110.00 1,449.78 1,347.78 -53.20 204.72 5,968,636.92 562,325.91 4.00 205.17 1,500.00 30.57 110.12 1,462.10 1,360.10 -55.67 211.47 5,968,634.51 562,332.69 4.00 211.95 1,600.00 34.55 110.84 1,546.37 1,444.37 -74.51 261.87 5,968,616.08 562,383.23 4.00 262.51 1,700.00 38.53 111.43 1,626.70 1,524.70 -95,99 317.39 5,968,595.07 562,438.92 4.00 318.21 1,799.06 42.48 111.92 1,702.00 1,600.00 -119.77 377.17 5,968,571.79 562,498.89 4.00 378.20 Sail ~ 42.48°Inc & 111.92°Azi : 1799ft MD, 1702ft TVD 1,800.00 42.48 111.92 1,702.69 1,600.69 -120.00 377.75 5,968,571.56 562,499.48 0.00 378.79 1,900.00 42.48 111.92 1,776.44 1,674.44 -145.22 440.41 5,968,546.86 562,562.33 0.00 441.66 1,956.36 42.48 111.92 1,818.00 1,716.00 -159.43 475.71 5,968,532.94 562,597.75 0.00 477.09 Base Perrnafroat 2,000.00 42.48 111.92 1,850.19 1,748.19 -170.44 503.06 5,968,522.17 562,625.18 0.00 504.53 2,002.46 42.48 111.92 1,852.00 1,750.00 -171.06 504.60 5,968,521.56 562,626.73 0.00 506.07 Continue Bu ild ~ 4°/100ft , 2002ft MD, 1852ft TVD 2,100.00 46.38 111.92 1,921.64 1,819.64 -196.55 567.94 5,968,496.59 562,690.27 4.00 569.63 2,200.00 50.38 111.92 1,988.04 1,886.04 -224.46 637.28 5,968,469.26 562,759.83 4.00 639.21 2,300.00 54.38 111.92 2,049.06 1,947.06 -254.03 710.74 5,968,440.30 562,833.54 4.00 712.93 2,400.00 58.38 111.92 2,104.41 2,002.41 -285.12 787.98 5,968,409.86 562,911.02 4.00 790.44 2,500.00 62.38 111.92 2,153.82 2,051.82 -317.58 868.62 5,968,378.08 562,991.91 4.00 871.35 2,600.00 66.38 111.92 2,197.04 2,095.04 -351.24 952.25 5,968,345.11 563,075.81 4.00 955.28 2,671.39 69.24 111.92 2,224.00 2,122.00 -375.92 1,013.56 5,968,320.94 563,137.32 4.00 1,016.80 Sail ~ 69.24°Inc & 111.92°Azi : 2671ft MD, 2224ft TVD 2,700.00 69.24 111.92 2,234.14 2,132.14 -385.91 1,038.38 5,968,311.16 563,162.22 0.00 1,041.71 2,800.00 69.24 111.92 2,269.59 2,167.59 -420.82 1,125.13 5,968,276.97 563,249.24 0.00 1,128.76 2,900.00 69.24 111.92 2,305.03 2,203.03 -455.74 1,211.87 5,968,242.77 563,336.27 0.00 1,215.80 3,000.00 69.24 111.92 2,340.48 2,238.48 -490.65 1,298.62 5,968,208.58 563,423.29 0.00 1,302.85 3,100.00 69.24 111.92 2,375.92 2,273.92 -525.56 1,385.36 5,968,174.39 563,510.31 0.00 1,389.89 3,200.00 69.24 111.92 2,411.37 2,309.37 -560.48 1,472.10 5,968,140.20 563,597.33 0.00 1,476.94 3,300.00 69.24 111.92 2,446.81 2,344.81 -595.39 1,558.85 5,968,106.01 563,684.36 0.00 1,563.99 3,400.00 69.24 111.92 2,482.26 2,380.26 -630.31 1,645.59 5,968,071.81 563,771.38 0.00 1,651.03 3,500.00 69.24 111.92 2,517.70 2,415.70 -665.22 1,732.34 5,968,037.62 563,858.40 0.00 1,738.08 6/15/2005 1:40:57PM Page 4 of 11 COMPASS 2003.118ui1d 48 ~~ ~~~~~~ ~ ~ ~ Ph ll Halliburton Company HALLIB~JRTON Conoco i i ps Planning Report -Geographic Alaska Sperry Drilling Selnrices Database: EDM 2003.11 Single User Db Local Co-ordinate Reference: Well Plan: 1 C-28 Company: CortocoPhillipsAlaska (Kuparuk) TVD Reference: Elev: 102t~ 102. OOft(WBP) Project: Kuparuk River Unit , MD Reference: Elev; 102.@ 102. OOft (WBP) Site: Kuparuk 1C Pad North Reference: True Well: Plan: 1C-28 Survey Calculation Method: Minimum Curvature Wellbore: Plan 1C-28 (wp10) Design: 1C-2 8 (wp10) Planned Survey 1C-28 (wp10) Map MaP MD Inclination Azimuth TVD SSTVD +N{-S +EI-W Northing Easting DLSEV Vert Section ~, (ft) (°) (°) (ft) (ft) (ft) - (ft) lft) (ft) (°/100ft) (ft) ~~ 3,600.00 69.24 111.92 2,553.15 2,451.15 -700.14 1,819.08 5,968,003.43 563,945.42 0.00 1,825.12 3,700.00 69.24 111.92 2,588.59 2,486.59 -735.05 1,905.83 5,967,969.24 564,032.44 0.00 1,912.17 3,800.00 69.24 111.92 2,624.04 2,522.04 -769.97 1,992.57 5,967,935.05 564,119.47 0.00 1,999.21 3,900.00 69.24 111.92 2,659.49 2,557.49 -804.88 2,079.32 5,967,900.86 564,206.49 0.00 2,086.26 4,000.00 69.24 111.92 2,694.93 2,592.93 -839.80 2,166.06 5,967,866.66 564,293.51 0.00 2,173.31 4,100.00 69.24 111.92 2,730.38 2,628.38 -874.71 2,252.80 5,967,832.47 564,380.53 0.00 2,260.35 4,200.00 69.24 111.92 2,765.82 2,663.82 -909.62 2,339.55 5,967,798.28 564,467.55 0.00 2,347.40 4,300.00 69.24 111.92 2,801.27 2,699.27 -944.54 2,426.29 5,967,764.09 564,554.58 0.00 2,434.44 4,400.00 69.24 111.92 2,836.71 2,734.71 -979.45 2,513.04 5,967,729.90 564,641.60 0.00 2,521.49 I 4,500.00 69.24 111.92 2,872.16 2,770.16 -1,014.37 2,599.78 5,967,695.70 564,728.62 0.00 2,608.54 ~~ 4,600.00 69.24 111.92 2,907.60 2,805.60 -1,049.28 2,686.53 5,967,661.51 564,815.64 0.00 2,695.58 4,700.00 69.24 111.92 2,943.05 2,841.05 -1,084.20 2,773.27 5,967,627.32 564,902.67 0.00 2,782.63 4,800.00 69.24 111.92 2,978.49 2,876.49 -1,119.11 2,860.02 5,967,593.13 564,989.69 0.00 2,869.67 4,900.00 69.24 111.92 3,013.94 2,911.94 -1,154.03 2,946.76 5,967,558.94 565,076.71 0.00 2,956.72 5,000.00 69.24 111.92 3,049.38 2,947.38 -1,188.94 3,033.50 5,967,524.74 565,163.73 0.00 3,043.76 5,100.00 69.24 111.92 3,084.83 2,982.83 -1,223.86 3,120.25 5,967,490.55 565,250.75 0.00 3,130.81 5,200.00 69.24 111.92 3,120.28 3,018.28 -1,258.77 3,206.99 5,967,456.36 565,337.78 0.00 3,217.86 5,300.00 69.24 111.92 3,155.72 3,053.72 -1,293.68 3,293.74 5,967,422.17 565,424.80 0.00 3,304.90 5,400.00 69.24 111.92 3,191.17 3,089.17 -1,328.60 3,380.48 5,967,387.98 565,511.82 0.00 3,391.95 5,500.00 69.24 111.92 3,226.61 3,124.61 -1,363.51 3,467.23 5,967,353.78 565,598.84 0.00 3,478.99 5,526.49 69.24 111.92 3,236.00 3,134.00 -1,372.76 3,490.20 5,967,344.73 565,621.89 0.00 3,502.05 Top Ugnu 5,600.00 69.24 111.92 3,262.06 3,160.06 -1,398.43 3,553.97 5,967,319.59 565,685.87 0.00 3,566.04 5,700.00 69.24 111.92 3,297.50 3,195.50 -1,433.34 3,640.72 5,967,285.40 565,772.89 0.00 3,653.08 ~ 5,800.00 69.24 111.92 3,332.95 3,230.95 -1,468.26 3,727.46 5,967,251.21 565,859.91 0.00 3,740.13 Ali 5,900.00 69.24 111.92 3,368.39 3,266.39 -1,503.17 3,814.20 5,967,217.02 565,946.93 0.00 3,827.18 6,000.00 69.24 111.92 3,403.84 3,301.84 -1,538.09 3,900.95 5,967,182.82 566,033.95 0.00 3,914.22 i~ 6,100.00 69.24 111.92 3,439.28 3,337.28 -1,573.00 3,987.69 5,967,148.63 566,120.98 0.00 4,001.27 I 6,200.00 69.24 111.92 3,474.73 3,372.73 -1,607.92 4,074.44 5,967,114.44 566,208.00 0.00 4,088.31 it 6,300.00 69.24 111.92 3,510.18 3,408.18 -1,642.83 4,161.18 5,967,080.25 566,295.02 0.00 4,175.36 ', 6,400.00 69.24 111.92 3,545.62 3,443.62 -1,677.74 4,247.93 5,967,046.06 566,382.04 0.00 4,262.41 6,500.00 69.24 111.92 3,581.07 3,479.07 -1,712.66 4,334.67 5,967,011.86 566,469.06 0.00 4,349.45 6,600.00 69.24 111.92 3,616.51 3,514.51 -1,747.57 4,421.42 5,966,977.67 566,556.09 0.00 4,436.50 6,700.00 69.24 111.92 3,651.96 3,549.96 -1,782.49 4,508.16 5,966,943.48 566,643.11 0.00 4,523.54 6,800.00 69.24 111.92 3,687.40 3,585.40 -1,817.40 4,594.90 5,966,909.29 566,730.13 0.00 4,610.59 6,900.00 69.24 111.92 3,722.85 3,620.85 -1,852.32 4,681.65 5,966,875.10 566,817.15 0.00 4,697.63 7,000.00 69.24 111.92 3,758.29 3,656.29 -1,887.23 4,768.39 5,966,840.90 566,904.18 0.00 4,784.68 7,100.00 69.24 111.92 3,793.74 3,691.74 -1,922.15 4,855.14 5,966,806.71 566,991.20 0.00 4,871.73 7,200.00 69.24 111.92 3,829.18 3,727.18 -1,957.06 4,941.88 5,966,772.52 567,078.22 0.00 4,958.77 7,300.00 69.24 111.92 3,864.63 3,762.63 -1,991.98 5,028.63 5,966,738.33 567,165.24 0.00 5,045.82 7,400.00 69.24 111.92 3,900.07 3,798.07 -2,026.89 5,115.37 5,966,704.14 567,252.26 0.00 5,132.86 7,439.29 69.24 111.92 3,914.00 3,812.00 -2,040.61 5,149.45 5,966,690.70 567,286.45 0.00 5,167.06 Top West Sak 7,500.00 69.24 111.92 3,935.52 3,833.52 -2,061.80 5,202.12 5,966,669.94 567,339.29 0.00 5,219.91 7,600.00 69.24 111.92 3,970.97 3,868.97 -2,096.72 5,288.86 5,966,635.75 567,426.31 0.00 5,306.96 7,700.00 69.24 111.92 4,006.41 3,904.41 -2,131.63 5,375.60 5,966,601.56 567,513.33 0.00 5,394.00 7,800.00 69.24 111.92 4,041.86 3,939.86 -2,166.55 5,462.35 5,966,567.37 567,600.35 0.00 5,481.05 7,900.00 69.24 111.92 4,077.30 3,975.30 -2,201.46 5,549.09 5,966,533.18 567,687.38 0.00 5,568.09 8,000.00 69.24 111.92 4,112.75 4,010.75 -2,236.38 5,635.84 5,966,498.98 567,774.40 0.00 5,655.14 6/iH/2005 1:40:57PM Page 5 of 11 COMPASS 2003.118ui1d 48 ORIGINAL ~, ConocoPhillips Alaska Database: EDM 2003:11 Single User Db Company: ConocoPhillips Alaska (f<uparuk) Project: Kuparuk River Unit Site: Kuparuk 1C Pad Well: Plan: 1C-28 Weilbore: PIan1C-28(wp10) Design: 1C-28 (wp10) Halliburton Company Planning Report -Geographic Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: • HALLIBURTON Spsrry Drilling Services Well Plan: 1 C-28 Etev: 102 @ 102:OOft (WBP) Elev: `102 @ 102:OOft (WBP) True Minimum Curvature Planned Survey 1C-28 (wp10) Map Map MD I nclination Azimuth TVD SSTVD +N/S +E/-W Northing Easting DLSEV Vert Section (ft) (°) (°) (ft) fftl (ftj (ft) Ift) (ft) (°/100ft) (ft) 8,100.00 69.24 111.92 4,148.19 4,046.19 -2,271.29 5,722.58 5,966,464.79 567,861.42 0.00 5,742.18 8,200.00 69.24 111.92 4,183.64 4,081.64 -2,306.21 5,809.33 5,966,430.60 567,948.44 0.00 5,829.23 8,300.00 69.24 111.92 4,219.08 4,117.08 -2,341.12 5,896.07 5,966,396.41 568,035.46 0.00 5,916.28 8,400.00 69.24 111.92 4,254.53 4,152.53 -2,376.04 5,982.82 5,966,362.22 568,122.49 0.00 6,003.32 8,500.00 69.24 111.92 4,289.97 4,187.97 -2,410.95 6,069.56 5,966,326.02 568,209.51 0.00 6,090.37 8,564.96 69.24 111.92 4,313.00 4,211.00 -2,433.63 6,125.91 5,966,305.81 568,266.04 0.00 6,146.91 Base West Sa k 8,600.00 69.24 111.92 4,325.42 4,223.42 -2,445.86 6,156.30 5,966,293.83 568,296.53 0.00 6,177.41 8,700.00 69.24 111.92 4,360.87 4,258.87 -2,480.78 6,243.05 5,966,259.64 568,383.55 0.00 6,264.46 8,800.00 69.24 111.92 4,396.31 4,294.31 -2,515.69 6,329.79 5,966,225.45 568,470.57 0.00 6,351.51 8,900.00 69.24 111.92 4,431.76 4,329.76 -2,550.61 6,416.54 5,966,191.26 568,557.60 0.00 6,438.55 9,000.00 69.24 111.92 4,467.20 4,365.20 -2,585.52 6,503.28 5,966,157.06 568,644.62 0.00 6,525.60 9,100.00 69.24 111.92 4,502.65 4,400.65 -2,620.44 6,590.03 5,966,122.87 568,731.64 0.00 6,612.64 9,129.21 69.24 111.92 4,513.00 4,411.00 -2,630.64 6,615.36 5,966,112.89 568,757.06 0.00 6,638.07 10 3/4" Casing - 9129ft MD, 4513ft TVD : 1097ft FSL 8 2476ft FEL :Sec 7 - T11 N - R71 E -10 3l4" 9,171.39 69.24 111.92 4,527.95 4,425.95 -2,645.36 6,651.95 5,966,098.46 568,793.76 0.00 6,674.78 Continue Tum ~ 3°I100ft , 9171ft MD, 4528ft TVD 9,200.00 69.23 111.01 4,538.10 4,436.10 -2,655.15 6,676.85 5,966,088.88 568,818.74 3.00 6,699.76 9,300.00 69.22 107.80 4,573.58 4,471.58 -2,686.21 6,765.02 5,966,058.56 568,907.16 3.00 6,788.20 9,362.51 69.24 105.79 4,595.75 4,493.75 -2,703.10 6,820.97 5,966,042.14 568,963.24 3.00 6,844.30 Sail ~ 69.24°Inc & 105.79°Azl : 9383ft MD, 4696ft TVD 9,400.00 69.24 105.79 4,609.03 4,507.03 -2,712.64 6,854.71 5,966,032.88 568,997.05 0.00 6,878.12 9,500.00 69.24 105.79 4,644.47 4,542.47 -2,738.08 6,944.69 5,966,008.18 569,087.23 0.00 6,968.32 9,600.00 69.24 105.79 4,679.91 4,577.91 -2,763.53 7,034.67 5,965,983.48 569,177.41 0.00 7,058.51 9,700.00 69.24 105.79 4,715.35 4,613.35 -2,788.98 7,124.65 5,965,958.77 569,267.59 0.00 7,148.71 9,800.00 69.24 105.79 4,750.78 4,648.78 -2,814.43 7,214.63 5,965,934.07 569,357.77 0.00 7,238.91 9,900.00 69.24 105.79 4,786.22 4,684.22 -2,839.88 7,304.61 5,965,909.37 569,447.95 0.00 7,329.11 10,000.00 69.24 105.79 4,821.66 4,719.66 -2,865.33 7,394.59 5,965,884.67 569,538.13 0.00 7,419.31 10,100.00 69.24 105.79 4,857.10 4,755.10 -2,890.78 7,484.57 5,965,859.97 569,628.31 0.00 7,509.51 10,200.00 69.24 105.79 4,892.54 4,790.54 -2,916.23 7,574.55 5,965,835.27 569,718.48 0.00 7,599.71 10,300.00 69.24 105.79 4,927.98 4,825.98 -2,941.68 7,664.53 5,965,810.57 569,808.66 0.00 7,689.91 10,400.00 69.24 105.79 4,963.41 4,861.41 -2,967.13 7,754.51 5,965,785.87 569,898.84 0.00 7,780.11 10,500.00 69.24 105.79 4,998.85 4,896.85 -2,992.58 7,844.49 5,965,761.16 569,989.02 0.00 7,870.31 10,600.00 69.24 105.79 5,034.29 4,932.29 -3,018.03 7,934.47 5,965,736.46 570,079.20 0.00 7,960.50 10,700.00 69.24 105.79 5,069.73 4,967.73 -3,043.48 8,024.45 5,965,711.76 570,169.38 0.00 8,050.70 10,800.00 69.24 105.79 5,105.17 5,003.17 -3,068.93 8,114.43 5,965,687.06 570,259.56 0.00 8,140.90 10,900.00 69.24 105.79 5,140.61 5,038.61 -3,094.38 8,204.41 5,965,662.36 570,349.74 0.00 8,231.10 11,000.00 69.24 105.79 5,176.04 5,074.04 -3,119.82 8,294.39 5,965,637.66 570,439.92 0.00 8,321.30 11,100.00 69.24 105.79 5,211.48 5,109.48 -3,145.27 8,384.37 5,965,612.96 570,530.10 0.00 8,411.50 11,200.00 69.24 105.79 5,246.92 5,144.92 -3,170.72 8,474.35 5,965,588.26 570,620.28 0.00 8,501.70 11,300.00 69.24 105.79 5,282.36 5,180.36 -3,196.17 8,564.33 5,965,563.56 570,710.46 0.00 8,591.90 11,400.00 69.24 105.79 5,317.80 5,215.80 -3,221.62 8,654.31 5,965,538.85 570,800.64 0.00 8,682.10 11,500.00 69.24 105.79 5,353.24 5,251.24 -3,247.07 8,744.29 5,965,514.15 570,890.82 0.00 8,772.30 11,600.00 69.24 105.79 5,388.67 5,286.67 -3,272.52 8,834.27 5,965,489.45 570,980.99 0.00 8,862.49 11,700.00 69.24 105.79 5,424.11 5,322.11 -3,297.97 8,924.25 5,965,464.75 571,071.17 0.00 8,952.69 11,800.00 69.24 105.79 5,459.55 5,357.55 -3,323.42 9,014.23 5,965,440.05 571,161.35 0.00 9,042.89 11,900.00 69.24 105.79 5,494.99 5,392.99 -3,348.87 9,104.21 5,965,415.35 571,251.53 0.00 9,133.09 12,000.00 69.24 105.79 5,530.43 5,428.43 -3,374.32 9,194.19 5,965,390.65 571,341.71 0.00 9,223.29 6/15/2005 1:40:57PM Page 6 of 11 COMPASS 2003.11 Build 48 ORIGINA!_ ~ • ConocoPhillips Alaska Database: EDM 2003.11' Single User Db Company: ConocoPhillips Alaska (Kuparuk) Project: Kuparuk River Unif Site: Kuparuk 1C Pad Weil: Plan: 1 C 28 Wellbore: Plan 1C-28 (wp1`0) Design: 1C-28 (wp10) Halliburton Company Planning Report -Geographic Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Planned Survey 1C-28 (wp10) MD Inclination Azimuth ND SSTVD +NIS +E/-W (ft) (°) (°) (ftl (ftl (ft) Ift) 12,100.00 69.24 105.79 5,565.86 5,463.86 -3,399.77 9,284.17 12,200.00 69.24 105.79 5,601.30 5,499.30 -3,425.22 9,374.16 12,300.00 69.24 105.79 5,636.74 5,534.74 -3,450,67 9,464.14 12,400.00 69.24 105.79 5,672.18 5,570.18 -3,476.11 9,554.12 12,500.00 69.24 105.79 5,707.62 5,605.62 -3,501.56 9,644.10 12,600.00 69.24 105.79 5,743.06 5,641.06 -3,527.01 9,734.08 12,700.00 69.24 105.79 5,778.49 5,676.49 -3,552.46 9,824.06 12,800.00 69.24 105.79 5,813.93 5,711.93 -3,577.91 9,914.04 12,900.00 69.24 105.79 5,849.37 5,747.37 -3,603.36 10,004.02 13,000.00 69.24 105.79 5,884.81 5,782.81 -3,628.81 10,094.00 13,100.00 69.24 105.79 5,920.25 5,818.25 -3,654.26 10,183.98 13,200.00 69.24 105.79 5,955.69 5,853.69 -3,679.71 10,273.96 13,300.00 69.24 105.79 5,991.12 5,889.12 -3,705.16 10,363.94 13,400.00 69.24 105.79 6,026.56 5,924.56 -3,730.61 10,453.92 13,500.00 69.24 105.79 6,062.00 5,960.00 -3,756.06 10,543.90 13,600.00 69.24 105.79 6,097.44 5,995.44 -3,781.51 10,633.88 13,700.00 69.24 105.79 6,132.88 6,030.88 -3,806.96 10,723.86 13,800.00 69.24 105.79 6,168.32 6,066.32 -3,832.40 10,813.84 13,900.00 69.24 105.79 6,203.75 6,101.75 -3,857.85 10,903.82 14,000.00 69.24 105.79 6,239.19 6,137.19 -3,883.30 10,993.80 14,100.00 69.24 105:79 6,274.63 6,172.63 -3,908.75 11,083.78 14,184.71 69.24 105.79 6,304.65 6,202.65 -3,930.31 11,160.01 Continue Bu lid ~ 3°I100ft , 14186ft MD, 8305ft ND 14,200.00 69.59 105.47 6,310.03 6,208.03 -3,934.17 11,173.79 14,268.38 71.15 104.05 6,333.00 6,231.00 -3,950.57 11,236.07 Base HRZ 14,300.00 71.87 103.41 6,343.03 6,241.03 -3,957.69 11,265.20 14,400.00 74.17 101.39 6,372.23 6,270.23 -3,978.21 11,358.60 14,500.00 76.49 99.43 6,397.55 6,295.55 -3,995.68 11,453.73 14,523.79 77.05 98.96 6,403.00 6,301.00 -3,999.38 11,476.60 K1 14,600.00 78.82 97.50 6,418.93 6,316.93 -4,010.05 11,550.35 14,700.00 81.17 95.60 6,436.29 6,334.29 -4,021.27 11,648.18 14,800.00 83.53 93.73 6,449.61 6,347.61 -4,029.32 11,746.95 14,803.51 83.61 93.66 6,450.00 6,348.00 -4,029.55 11,750.43 D Shale 14,900.00 85.89 91.87 6,458.83 6,356.83 -4,034.18 11,846.39 14,933.57 86.69 91.25 6,461.00 6,359.00 -4,035.09 11,879.87 C4 14,952.08 87.12 90.91 6,462.00 6,360.00 -4,035.43 11,898.36 Saii ~ 87.12°Inc & 90.91°Azl : 14952ft MD, 8462ft ND - 1C-2$ Heel (wp10) - 1C-21 DD Poly (wp10) 14,983.00 87.12 90.91 6,463.55 6,361.55 -4,035.92 11,929.24 7 518" Casing -14983ft MD, 86484ft TVD : 314ft FNL & 2449ft FEL - Sec 17 - T11 N - T11 E - 7 Sl8" 15,000.00 87.12 90.91 6,464.40 6,362.40 -4,036.19 11,946.21 15,003.00 87.12 90.91 6,464.56 6,362.56 -4,036.24 11,949.21 Continue Geo3teering In C4ft , 15003ft MD, 8465ft TVD 6/15x2005 1:40:57PM Page 7 of 11 r 1 I~ HALLIBURTON Sperry Drilling Services WeII Plan: 1C-28 Elev: 102 @ 102.OOft (WBP) Elev: 102 @ 102:OOft (WBP) True Minimum Curvature Map Map Northing Easting DLSEV Vert Section Iftl (ft) (°MOOft) Iftl 5,965,365.95 571,431.89 0.00 9,313.49 5,965,341.25 571,522.07 0.00 9,403.69 5,965,316.54 571,612.25 0.00 9,493.89 5,965,291.84 571,702.43 0.00 9,584.09 5,965,267.14 571,792.61 0.00 9,674.29 5,965,242.44 571,882.79 0.00 9,764.48 5,965,217.74 571,972.97 0.00 9,854.68 5,965,193.04 572,063.15 0.00 9,944.88 5,965,168.34 572,153.33 0.00 10,035.08 5,965,143.64 572,243.50 0.00 10,125.28 5,965,118.93 572,333.68 0.00 10,215.48 5,965,094.23 572,423.86 0.00 10,305.68 5,965,069.53 572,514.04 0.00 10,395.88 5,965,044.83 572,604.22 0.00 10,486.08 5,965,020.13 572,694.40 0.00 10,576.28 5,964,995.43 572,784.58 0.00 10,666.47 5,964,970.73 572,874.76 0.00 10,756.67 5,964,946.03 572,964.94 0.00 10,846.87 5,964,921.33 573,055.12 0.00 10,937.07 5,964,896.62 573,145.30 0.00 11,027.27 5,964,871.92 573,235.48 0.00 11,117.47 5,964,851.00 573,311.87 0.00 11,193.88 5,964,847.26 573,325.68 2.99 11,207.69 5,964,831.37 573,388.09 3.00 11,270.11 5,964,824.49 573,417.27 2.99 11,299.30 5,964,804.75 573,510.83 3.00 11,392.88 5,964,788.07 573,606.10 3.00 11,488.17 5,964,784.56 573,628.99 3.01 11,511.06 5,964,774.50 573,702.82 3.00 11,584.90 5,964,764.09 573,800.73 3.00 11,682.82 5,964,756.86 573,899.56 3.00 11,781.66 5,964,756.66 573,903.04 3.05 11,785.15 5,964,752.83 573,999.03 3.00 11,881.15 5,964,752.19 574,032.51 3.01 11,914.63 5,964,752.00 574,051.00 3.00 11,933.12 5,964,751.77 574,081.87 0.00 11,964.00 5,964,751.64 574,098.85 0.00 11,980.98 5,964,751.62 574,101.85 0.00 11,983.98 COMPASS 2003.118ui1d 48 ORIGINAL ~ / Ph C ll Halliburton Company HALLIBURTON onoco i i 5 p Planning Report -Geographic Alaska Sperry Qriliing Services Database: EDM 2003.11 Single User Db Local Coordinate Reference: Well Plan: 1 C-28 Company: ConocoPhillipsAlaska (KUparuk) TVD Reference: Elev: 102@ 102.OOft (WBP) Project: Kuparuk' River Unit MD Reference: Elev: 102 @ 102.OOft (WBP) Site: Kuparuk 1C Pad North Reference: True Well: Plan; 1C-28 Survey Calculation Method: Minimum Curvature Weilbore: Plan 1 C-28 (wp1`0) Design: 1C-28 (wp10) Planned Survey 1C-28 (wp10) Map Map MD Inclination Azimuth TVD SSTVD +N1S +E/-W Northing Easting DLSEV Vert Section (ft1 (°) (°) (ft) (ft) _ _(tt) ' (ft) (ft) (ft) (°l100ft1 (ftl 15,100.00 87.12 90.91 6,469.42 6,367.42 -4,037.77 12,046.07 5,964,750.89 574,198.71 0.00 12,080.85 15,200.00 87.12 90.91 6,474.44 6,372.44 -4,039.35 12,145.93 5,964,750.13 574,298.57 0.00 12,180.72 15,300.00 87.12 90.91 6,479.46 6,377.46 -4,040.93 12,245.80 5,964,749.38 574,398.44 0.00 12,280.59 I 15,350.00 87.12 90.91 6,481.97 6,379.97 -4,041.72 12,295.73 5,964,749.00 574,448.37 0.00 12,330.53 Possible Fault 1 Crossing : 1li350ft MD, 6482ft TVD 15,350.63 87.12 90.91 6,482.00 6,380.00 -4,041.73 12,296.36 5,964,749.00 574,449.00 0.00 12,331.16 1C-28 T1 (wp10) 15,400.00 88.26 92.20 6,483.99 6,381.99 -4,043.07 12,345.67 5,964,748.07 574,498.31 3.49 12,380.48 15,449.75 89.41 93.51 6,485.00 6,383.00 -4,045.55 12,395.34 5,964,746.00 574,548.00 3.50 12,430.17 1C-28 T2 (wp10) 15,500.00 88.51 94.72 6,485.92 6,383.92 -4,049.16 12,445.45 5,964,742.81 574,598.13 3.00 12,480.31 15,600.00 86.71 97.12 6,490.09 6,388.09 -4,059.46 12,544.82 5,964,733.33 574,697.57 3.00 12,579.77 15,644.99 85.90 98.21 6,492.99 6,39D.99 -4,065.45 12,589.32 5,964,727.71 574,742.11 3.00 12,624.31 ', 15,700.00 85.90 98.21 6,496.92 6,394.92 -4,073.29 12,643.62 5,964,720.32 574,796.48 0.00 12,678.69 15,800.00 85.90 98.21 6,504.07 6,402.07 -4,087.53 12,742.34 5,964,706.90 574,895.30 0.00 12,777.53 15,900.00 85.90 98.21 6,511.21 6,409.21 -4,101.77 12,841.07 5,964,693.48 574,994.13 0.00 12,876.37 i 15,911.00 85.90 98.21 6,512.00 6,410.00 -4,103.34 12,851.92 5,964,692.00 575,005.00 0.00 12,887.24 1C-28 T3 (wp10) 15,989.62 84.71 99.24 6,518.43 6,416.43 -4,115.22 12,929.38 5,964,680.76 575,082.54 2.00 12,964.80 16,000.00 84.71 99.24 6,519.39 6,417.39 -4,116.88 12,939.58 5,964,679.19 575,092.75 0.00 12,975.01 16,100.00 84.71 99.24 6,528.61 6,426.61 -4,132.86 13,037.86 5,964,664.02 575,191.16 0.00 13,073.43 16,200.00 84.71 99.24 6,537.84 6,435.84 -4,148.85 13,136.14 5,964,648.85 575,289.56 0.00 13,171.85 16,245.00 84.71 99.24 6,541.98 6,439.98 -4,156.04 13,180.37 5,964,642.02 575,333.84 0.00 13,216.13 Possible Fautt 2 Crossing : 18245ft MD, 6542ft TVD 16,245.16 84.71 99.24 6,542.00 6,440.00 -4,156.06 13,180.53 5,964,642.00 575,334.00 0.00 13,216.30 1 C-28 T4 (wp10) 16,300.00 85.57 99.92 6,546.65 6,444.65 -4,165.16 13,234.41 5,964,633.36 575,387.94 2.00 13,270.25 16,400.00 87.14 101.16 6,553.00 6,451.00 -4,183.41 13,332.52 5,964,615.92 575,486.19 2.00 13,368.51 16,400.33 87.15 101.16 6,553.02 6,451.02 -4,183.47 13,332.84 5,964,615.86 575,486.52 2.00 13,368.84 16,500.00 87.15 101.16 6,557.98 6,455.98 -4,202.74 13,430.50 5,964,597.40 575,584.33 0.00 13,466.67 I 16,600.00 87.15 101.16 6,562.96 6,460.96 -4,222.08 13,528.49 5,964,578.88 575,682.46 0.00 13,564.82 i 16,620.93 87.15 101.16 6,564.00 6,462.00 -4,226.12 13,549.00 5,964,575.00 575,703.00 0.00 13,585.36 1 C-28 Tb (wp10) 16,658.88 87.91 101.17 6,565.64 6,463.64 -4,233.47 13,586.19 5,964,567.97 575,740.25 2.00 13,622.62 16,700.00 87.91 101.17 6,567.14 6,465.14 -4,241.43 13,626.51 5,964,560.34 575,780.63 0.00 13,663.00 16,800.00 87.91 101.17 6,570.80 6,468.80 -4,260.79 13,724.55 5,964,541.79. 575,878.81 0.00 13,761.21 16,900.00 87.91 101.17 6,574.45 6,472.45 -4,280.15 13,822.59 5,964,523.25 575,977.00 0.00 13,859.41 I 17,000.00 87.91 101.17 6,578.10 6,476.10 -4,299.51 13,920.63 5,964,504.70 576,075.19 0.00 13,957.62 I 17,079.25 87.91 101.17 6,581.00 6,479.00 -4,314.85 13,998.32 5,964,490.00 576,153.00 0.00 14,035.44 I~ 1C-28 T6 (wp10) 17,100.00 88.15 100.53 6,581.71 6,479.71 -4,318.76 14,018.69 5,964,486.26 576,173.40 3.29 14,055.84 17,200.00 89.35 97.46 6,583.89 6,481.89 -4,334.39 14,117.42 5,964,471.45 576,272.25 3.30 14,154.71 17,300.00 90.56 94.39 6,583.96 6,481.96 -4,344.70 14,216.88 5,964,461.96 576,371.77 3.30 14,254.25 17,400.00 91.76 91.31 6,581.95 6,479.95 -4,349.67 14,316.72 5,964,457.83 576,471.64 3.30 14,354.13 17,445.14 92.30 89.92 6,580.35 6,478.35 -4,350.15 14,361.82 5,964,457.71 576,516.75 3.31 14,399.24 I~ 17,500.00 92.30 89.92 6,578.15 6,476.15 -4,350.08 14,416.64 5,964,458.24 576,571.56 0.00 14,454.05 6/15/2005 1:40:57PM Page 8 of 11 COMPASS 2003.11 Build 48 ORIGINAL / • Halliburton Company ConocoPhillips p- R rt ~ h~ HALLIBURTON Alaska a nning epo - eograp I c Sperry Drilling Services Database: EDM 2003:11 Single User Db Lo cal Co-ordinate Reference: Welf Plan: 1 C-28 Company: ConocoPhllips Alaska (Kuparuk) TVD Reference: Elev: 102 ~ 102. OOft (WBP) Project: Kuparuk River Unit. MD Reference: Elev: 102 ~ 102. OOft (WBP) Site: Kuparuk 1C Pad North Reference: True Well: Plan: 1C-28 Survey Calculation Method: Minimum Curvature Wellbore: Plan 1C-28 (wp10) Design: 1C-28 (wp10) Planned Survey 1028 (wp10) Map Map MD Inclination Azimuth TVD SSTVD +N/-S +E/-W Northing Fasting DLSEV Vert Section (ft) (°) (°) (ft) (ftl (ft) (ft) (ftl (ft) (°/100ft1 (ftl 17,578.52 92.30 89.92 6,575.00 6,473.00 -4,349.97 14,495.10 5,964,459.00 576,650.00 0.00 14,532.50 1C-28 T7 (wp10) 17,600.00 91.89 90.05 6,574.22 6,472.22 -4,349.96 14,516.56 5,964,459.18 576,671.47 1.99 14,553.97 17,685.90 90.24 90.54 6,572.62 6,470.62 -4,350.41 14,602.44 5,964,459.45 576,757.34 2.00 14,639.85 17,700.00 90.24 90.54 6,572.56 6,470.56 -4,350.54 14,616.54 5,964,459.44 576,771.44 0.00 14,653.95 17,800.00 90.24 90.54 6,572.14 6,470.14 -4,351.48 14,716.54 5,964,459.32 576,871.43 0.00 14,753.95 17,900.00 90.24 90.54 6,571.72 6,469.72 -4,352.43 14,816.53 5,964,459.20 576,971.42 0.00 14,853.95 18,000.00 90.24 90.54 6,571.29 6,469.29 -4,353.38 14,916.53 5,964,459.08 577,071.41 0.00 14,953.95 18,069.60 90.24 90.54 6,571.00 6,469.00 -4,354.04 14,986.13 5,964,459.00 577,141.00 0.00 15,023.55 1C-28 T8 (wp10) 18,076.78 90.12 90.47 6,570.98 6,468.98 -4,354.10 14,993.30 5,964,459.00 577,148.17 2.00 15,030.73 18,100.00 90.12 90.47 6,570.93 6,468.93 -4,354.29 15,016.52 5,964,459.00 577,171.40 0.00 15,053.95 18,200.00 90.12 90.47 6,570.73 6,468.73 -4,355.12 15,116.52 5,964,459.00 577,271.39 0.00 15,153.95 18,300.00 90.12 90.47 6,570.53 6,468.53 -4,355.95 15,216.52 5,964,459.00 577,371.38 0.00 15,253.95 18,400.00 90.12 90.47 6,570.32 6,468.32 -4,356.77 15,316.51 5,964,459.00 577,471.37 0.00 15,353.95 18,500.00 90.12 90.47 6,570.12 6,468.12 -4,357.60 15,416.51 5,964,459.00 577,571.36 0.00 15,453.95 18,560.65 90.12 90.47 6,570.00 6,468.00 -4,358.10 15,477.16 5,964,459.00 577,632.00 0.00 15,514.60 1C-28 T9 (wp10) 18,566.48 90.00 90.47 6,569.99 6,467.99 -4,358.15 15,482.99 5,964,459.00 577,637.83 2.00 15,520.43 18,600.00 90.00 90.47 6,569.99 6,467.99 -4,358.43 15,516.51 5,964,459.00 577,671.35 0.00 15,553.95 18,700.00 90.00 90.47 6,570.00 6,468.00 -4,359.25 15,616.50 5,964,459.00 577,771.34 0.00 15,653.95 18,800.00 90.00 90.47 6,570.00 6,468.00 -4,360.08 15,716.50 5,964,459.00 577,871.33 0.00 15,753.95 18,900.00 90.00 90.47 6,570.00 6,468.00 -4,360.91 15,816.50 5,964,459.00 577,971.32 0.00 15,853.95 18,952.69 90.00 90.47 6,570.00 6,468,00 -4,361.35 15,869.18 5,964,459.00 578,024.00 0.00 15,906.63 BHL ~ 18963ft MD, 6670ft TVD : 647ft FNL 8 1490ft FWL Sec 16 - T11 N - R11 E - 4 1/2" -1 C-28 Toe (wp10) ~ &/15/2005 1:40:57PM Page 9 of 11 COMPASS 2003.11 Build 48 y , ~ ~g~ 'V ~ ~ ~ 1D ~ ~d `L,.~ ConocoPhillips Alaska ConocoPhillips Alaska (Kuparuk) Kuparuk River Unit Kuparuk 1C Pad Plan: 1C-28 Plan 1C-28 (wp10) Anticollision Summary 15 June, 2005 HAl~L~Bt~RTC'~IV Sperry Drilling Services oRieiNa~ ~~ .~.~~ SURVHa' PROGRAM Date: 200SOS23T00:00:00 Validated: Yes Version: Depth FromDepth To Survey/Plan 7'001 102.00 1400.00 1C-28(wp10) CB-GYRO-SS 1400.0018952.68 1G28(wp10) MWD+IFR-AK-CA2rSC NAD27ASPZone4:WELLDETAILS: PWn:1C-28 Ground Level: 0.00 +WS +EI-W Northing Easting Latittude Lorgkude Sk# 0.00 0.00 5968688.42 562120.78 70°79'29.936N 149°29'46.588W j .__ REFERENCE INFORMATION Co-ordinate (NIE) Reference: Well Plan: 1C-28, True North Vertical (TVD) Reterence: FJev:102 ~ 102.OOR (WBP) Section (VS) Reference: (O.OON, O.OOE) Measured Depth Reference: Elev:102 @ 102.OOR (WBP) Calculation Method: Minimum Curvature ConocoPhillips Alaska (Kuparuk) Engineering West Sak Calculation Method: Minimum Curvature Error System: ISCWSA Scan Method: Trav. Cylinder North Error Surface: Elliptical Conic Waming Method: Rules Based From Colour To MD 102 500 500 750 750 1000 1000 1250 1250 1500 1500 1750 1750 2000 2000 3000 3000 4000 4000 5000 5000 6000 6000 7000 7000 8000 8000 9000 9000 10000 10000 11000 11000 12000 _;12000 -- 13000 13000 14000 14000 15000 15000 16000 16000 17000 17000 19000 ANTI-COLLISION SETTINGS Interpolation Method: MD Interval: 25Stations Depth Range From: 102.00 To 18952.69 Maximum Range:2085.06859273281 Reference: Plan: 1C-28 (wp10) 1so Travelling ('ylinder Azimuth (TF0+:17_p ~°~ vs ('entre [o Cen[re Separation (15 ttrn~ SECTION DETAILS 90 Sec MD Inc Azi TVD +WS +EI-W DLeg TFace VSec Target 1 1oz.oo o.oo o.o0 1oz.oo o.oo o.oo o.oo 0.90 0.00 2 600.00 0.00 0.00 600.00 0.00 0.00 0.00 0.00 0.00 3 1100.00 15.00 100.00 1094.31 -11.30 64.09 3.00 100.00 64.18 4 1485.73 30.00 110.00 1449.78 53.20 204.72 4.00 19.05 205.17 5 1799.06 42.48 111.82 1702.00 -119.77 377.17 4.00 6.00 378.20 6 2002.46 42.48 111.92 1852.00 -171.06 504.60 0.00 0.00 506.07 7 2671.39 69.24 111.92 2224.00 375.92 1013.56 4.00 0.00 1016.80 8 9171.39 69.24 111.92 4527.95 -2645.36 6651.95 0.00 0.00 6674.78 9 9362.51 69.24 105.79 4595.75 -2703.10 6820.97 3.00 -91.04 6844.30 1014184.71 69.24 105.79 6304.65 3930.3111160.07 0.00 0.0011193.88 1114952.08 87.12 90.91 6462.00 4035.4311898.36 3.00 -01.0011933.12 1C-28 Heel (wp10', 1275350.63 87.12 90.91 648200 4041.7312296.36 0.00 0.0012331.16 1C•28 T1 (wp10) 1315449.75 89.41 93.b1 6485.00 4045.5512395.34 3.50 48.8012430.17 1C-28 T2 (wp10) 1415644.99 85.90 98.21 6492.99 4065.4512589.32 3.00 126.8312624.31 1515971.00 85.90 98.21 6512.00 4103.3412851.92 0.00 0.0012887.24 1C-28 T3 (wp10) 1615989.62 84.71 99.24 6518.43 4115.2212929.38 200 139.4112964.80 1716245.16 64.71 99.24 6542.00 4156.0613180.53 0.00 0.0013276.30 1C•28 T4 (wp10) 1816400.33 87.15 101.16 6553.02 4183.4713332.84 2.00 38.3013368.84 1916620.93 87.15 101.16 6564.00 4226.1213549.00 0.00 0.0013585.36 1C-28 T5 (wp10) 2016658.88 87.91 101.17 6565.64 4233.4713586.79 2.00 0.6913622.62 2117079.25 87.91 101.17 6581.00 4314.8513998.32 0.00 0.0014035.44 1C-28 T6 (wp10) 2217445.14 92.30 89.92 6580.35 4350.1514361.82 3.30 -68.7314399.24 2377578.52 9230 89.92 6575.00 4349.9714495.10 0.00 0.0014532.50 1C-28 T7 (wp10) 2477685.90 90.24 90.54 6572.62 4350.4714602.44 2.00 163.1974639.85 2518069.60 90.24 90.54 6571.00 4354.0414986.13 0.00 0.0015023.55 1C-28 TB (wp10) 2616076.78 90.12 90.47 6570.98 4354.1014993.30 2.00 •151.5615030.73 2716560.65 90.12 90.47 6570.00 -0356.1015477.16 0.00 0.0015514.60 1C-28 T9 (wp10) 2816566.48 90.00 90.47 6569.99 -0358.1515482.99 2.00 179.7515520.43 2916952.69 90.00 90.47 6570.00 4361.3515669.18 0.00 0.0015906.63 1C-28 Tce (wp10) Travelling Cylinder Azimuth (TFO+ALI) ~°~ vs Centre to Centre Separation X100 f~n~ ~ / Haliiburton Company ll HALLIBURTON ConocoPh i i $ p Anticollision Report Alaska Sperry Drilling Services Company: ConocoPhillips Alaska (Kuparuk), Local Co-ordinate Reference: Well Plan: 9C-28 Project: Kuparuk. River Unit TVD Reference: Elev: 102 @ 102.OOft (WBP) , Reference Site: Kuparuk 1C Pad MD Reference: Elev: 102 @ 102.OOft (WBP) Site Error: O.OOft North Reference: True Reference Well: Plan: 1C-2$ Survey Calculation Method: Minimum Curvature Well Error: O:OOft Output errors are at 2.Op sigma Reference Wellbore Plan 1C-28 (wp10) Database: EDM 2003.Y1 Single User Db Reference Design: 1C-28 (wp10) Offset TYD Reference: OffsefDatum Reference 1C-28{wp10) Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria Interpolation Method: MD Interval 25.OOft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Trav. Cylinder North Results Limited by: Maximum center-center distance of 2,085.07ft Error Surface: Elliptical Conic Warning Levels evaluated at: 0.00 Sigma Survey Tool Program Date 6/15/2005 From To (ft) (ft) Survey (Wel-bore) Tool Name Description 102.00 1,400.00 1 C-28 (wp10) (Plan 1 C-28 (wp10)) CB-GYRO-SS Camera based gyro single shot 1,400.00 18,952.68 1C-28 (wp10) (Plan 1C-28 (wp10)) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC CC -Min centre to center distance or covergent point, SF -min separation factor, ES -min ellipse separation 6/15/2005 2:00:17PM Page 2 of 3 COMPASS 2003.11 Build 48 ®~ ConocoPhillips Alaska Company: ConoccrPhillipsAlaska (Kuparuk) Project: Kuparuk River Unif Reference Site: Kuparuk 1C Pad: Site Error: O.OOft Reference Well: Plart: 1C-28 Well Error: O.OOft Reference Wellbore Plan 1C-28-(wp10) Reference Design: 1C-28 (wp10) Halliburton Com an P y HALLIBURTON Anticollision Report Sperry Drilling Services Local Co-ordinate Reference: WeA Plan: 1C 28 ND Reference: Elev: 102 @ 402:OOft (WBP)" MD Reference: Elev: 102 @ 102.OOft (WBP) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 2.00. sigma Database: EDM 2003.11. Single User Db Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well -Wellbore -Design (ft) (ft) (ft) (ft) Kuparuk 1GPad 1 C-01 - 1 C-01 - 1 C-01 1,693.33 1,625.00 84.80 30.51 54.28 Pass -Major Risk 1C-02-1C-02-1C-02 1,409.26 1,375.00 62.24 26.97 35.26 Pass-Major Risk 1 C-03 - 1 C-03 - 1 C-03 885.79 875.00 51.42 15.88 35.54 Pass -Major Risk 1 C-04 - 1 C-04 - 1 C-04 631.98 625.00 67.42 10.04 57.37 Pass -Major Risk 1 C-05 - 1 C-05 - 1 C-05 653.26 650.00 186.05 9.88 176.16 Pass -Major Risk 1 C-12 - 1 C-12 - 1 C-12 5,058.33 5,725.00 365.94 224.00 141.94 Pass -Major Risk 1 C-123 - 1 C-123 - 1 C-123 349.99 350.00 247.67 4.83 242.84 Pass -Major Risk 1C-125 - 1C-125 - 1C-125 325.52 325.00 228.20 4.74 223.45 Pass -Major Risk 1C-127 - 1C-127 - 1C-127 225.00 225.00 211.47 2.93 208.54 Pass -Major Risk 1 C-131 - 1 C-131 - 1 C-131 200.55 200.00 187.99 2.55 185.44 Pass -Major Risk 1 C-133 - 1 C-133 - 1 C-133 599.94 600.00 178.71 8.94 169.77 Pass -Major Risk 1 C-135 - 1 C-135 - 1 C-135 186.49 175.00 182.99 2.27 180.72 Pass -Major Risk 1C-135 - 1C-135PB1 - 1C-135P61 186.49 175.00 182.99 2.31 180.68 Pass- Major Risk 1 C-14 - 1 C-14 - 1 C-14 150.70 150.00 30.49 1.77 28.72 Pass -Major Risk 1C-15 - 1C-15 - 1C-15 400.53 400.00 153.29 6.11 147.18 Pass -Major Risk 1 C-15 - 1 C-15L1 - 1 C-15L1 400.33 400.00 153.28 6.11 147.18 Pass -Major Risk 1 C-16 - 1 C-16 - 1 C-16 710.20 725.00 239.66 13.03 226.63 Pass -Major Risk 1C-170 - 1C-170 - 1C-170 614.32 600.00 142.81 9.82 132.99 Pass -Major Risk 1C-170-1C-170P61-1C-170PB1 614.32 600.00 142.81 9.82 132.99 Pass-Major Risk 1 C-172 - 1 C-172 - 1 C-172 289.79 275.00 116.03 4.41 111.62 Pass -Major Risk 1 C-174 - 1 C-174 - 1 C-174 389.58 375.00 93.37 6.09 87.28 Pass -Major Risk 1 C-178 - 1 C-178 - 1 C-178 884.54 875.00 28.56 15.52 13.04 Pass -Major Risk 1C-178 - 1C-178L1 - 1C-178L1 884.54 875.00 28.56 15.52 13.04 Pass -Major Risk 1 C-178 - 1 C-178L1 PB1 - 1 C-178L1 P81 884.54 875.00 28.56 15.52 13.04 Pass -Major Risk 1 C-178 - 1 C-178L1 PB2 - 1 C-178L1 P62 884.54 875.00 28.56 15.52 13.04 Pass -Major Risk 1 C-18 - 1 C-18 - 1 C-18 624.03 625.00 127.95 9.26 118.68 Pass -Major Risk 1 C-184 - 1 C-184 - 1 C-184 1,660.64 1,575.00 108.87 29.82 79.06 Pass -Major Risk 1C-19-1C-19-1C-19 1,556.75 1,450.00 180.68 26.23 154.45 Pass-Major Risk 1 C-190 - 1 C-190 - 1 C-190 2,631.65 2,350.00 182.23 71.97 110.27 Pass -Major Risk 1 C-22 - 1 C-22 - 1 C-22 391.99 350.00 218.38 6.05 212.33 Pass -Major Risk 1 C-23 - 1 C-23 - 1 C-23 481.42 475.00 200.51 7.41 193.10 Pass -Major Risk 1 C-23PB1 - 1 C-23PB1 - 1 C-23P81 481.42 475.00 200.51 7.41 193.10 Pass -Major Risk 1C-24-1C-24-1C-24 1,138.59 1,100.00 204.60 19.41 185.19 Pass-Major Risk 1C-25-1C-25-1C-25 1,988.38 1,825.00 199.63 35.91 .163.72 Pass-Major Risk 1C-26-1C-26-1C-26 1,725.08 1,625.00 197.87 30.68 167.20 Pass-Major Risk 1 C-27 - 1 C-27 - 1 C-27 2,199.56 1,975.00 252.42 42.76 209.66 Pass -Major Risk Plan: 1C-129-1C-129-1C-129(wp01) 1,034.34 1,050.00 143.86 20.47 123.39 Pass-Major Risk Plan: 1 C-20 (HEW2) - PIan:1 C- 20 - 1 C-20 (wp06) 574.98 575.00 124.03 10.49 113,55 Pass -Major Risk Plan:1C-21-1C-21Mainbore-1C-21Mainbore 1,237.06 1,225.00 39.63 22.29 17.33 Pass-Major Risk PIan:1C-21-1C-21PB1-1C-21P61 1,237.06 1,225.00 39.63 22.16 17.46 Pass-Major Risk PIan:1C-21-1C-21P62-1C-21PB2 1,237.06 1,225.00 39.63 22.29 17.33 Pass-Major Risk PIan:1C-21-1C-21P63-1C-21 P63 1,237.06 1,225.00 39.63 22.16 17.46 Pass-Major Risk Plan:1C-28-PIan:1C-28-1C-28(wp09) 16,151.22 16,299.93 13.18 471.81 -458.63 FAIL-Major Risk CC -Min centre to center distance or covergent point, SF -min separation factor, ES -min ellipse separation 6/15/2005 2:00:17PM Page 3 of 3 COMPASS 2003.11 Build 48 ORIGINAL. -~ - KRU 1C-28 ''c-1`' ~~~ T11 N, R11 E, U.M. 1~, `'~~, T11I~1, R10E, U.M. Proposed 1-Oil ,c D, ,, .. ~~ ~ Kuparuk River Oil Pool 2051040 I , ~r tc-t oP I /' w ~`~ ~ Confidential wells shown as red -- -, tc o ~ SFD 7/6/2005 ~+c-~+1~.. ' !. c-, , o ~-~ - ~"..~ - - --~ - ___~ - ~~= J. 1004 - - - .f A~Q - _ - '~~--~. tG-, 2, '~ ' '` ,D_ D~ ~ S Slotted Liner ~.. ,c-,-'?~ ~ ~i ~ ~ o ,'t c 1 ~: t C _ N CS ~ V r~, ,crr, ~ la~ro~ua ~ ~ 8 S ~ c_, , ~ eIr- ~ r, ~9b l I C _ i "+.' ,G-, 25 ,G-, „ 18 I D- 08 1 D 1 40 1~ 1D- 40L1 3 ~ ~ T I I tD 4 1D /DI ID IO~1C-10 ,/f~, ~ ~ '' ~ ID n, ~~ ..,- ~ I i ~.\\\ 1 105 ~I i ~ c ~~ \'~- 1 C- I 1 ~( t 1 8 ~~ ' • \• ~t ~ ..._ ~~`"' _ "• ,;If ~ ~-''` -- _ • Feet ~ ~- is '.. ~~ 0 1,000 2,000 3,000 4,000 1 ` --_ 1 f ~ ~11i I ail ~.., 1 r ~ 1, ,~~,~ ~' ~, .. ~ ~_ -. __, __ SHARON K. ALLSUP-DRAKE CONOCOPHILLIPS 1105 ATO 1530 ~ ~ 700 G ST. ANCHORAGE AK 99501 DATE ~ /i'~ `~ ~82-14/311 PAY TO 7HE ~ /1 ~~!" OI /j / ,A~~, ( /~~~` ORDER OF /~ G /'7(~'('y ~ /~• /Iii----~ ,~ ~.~dF.w,,, ----r DOLLARS Ll 1 ~ CHASE Chase Manhattan Bank USA, N A. e.~x 200 While Clay Center Dr Newark, DE 19111 Valid Up To 0 Dollars MEMO /~ ~Y~~l`~ II ----------------------------- ~~ Np ,: ~: 0 3 i L 0 0 i 4 4 is 2 l 8 4 7 L 9 0 7 9 2 7 611' l ~ 0 5 ~~ ---------- -- ~ • TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/pARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME PTD# CHECK WHAT ADD-ONS "CLUE" APPLIES (OPTIONS) MULTI The permit is for a new wellbore segment of LATERAL existing well , Permit No, API No. (If API number Production should continue to be reported as last two (2) digits a function of the original API number stated are between 60-69) above. PILOT HOLE In accordance with 20 AAC 25.005(f), all (pT~ records, -data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 - 70/80) from records, data and logs acquired for well (name on permit). SPACING The permit is approved subject to full EXCEPTION compliance with 20 AAC 25.055. Approval to perforate and produce/infect is contingent upon issuance of a conservation order approving a spacing exception. (Comnany Name) assumes _ the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the SAMPLE Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Rev: 04/01/05 C\jody\transmittal_checklist WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RV OIL - 490100 Well Name: KUPARUK RIV UNIT 1C-28 Program DEV Well bore seg ^ PTD#:2U51040 Company CONOCOPHILLIPS ALASKA INC Initial ClasslType DEV! PEND GeoArea 890 Unit 11160 OnlOff Shore On Annular Disposal ^ Administration '1 Permit_feeattached_________________________ __________ ________ Yes._____ _ -------------------------------------------------------------------- 2 Lease number appropriate_ - - - - - . , Yes _ _ Corrected omission on_401 farm:. Surf loc in ADL 25649, well,passes through 28242,-top productive interva_I in- _ 3 Uni-quewell-name andnumber_____________________________ _________Yes--.___ _ADL 28243, TD in ADL 28244._------_-__,__-_-_.._______-_-__--___.___-_____ 4 Well located in_a_defined_pool_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , _ - - - _ _ _ _ _ _ -Yes _ _ _ _ _ _ _ Kupa[uk River Oil_ Pool, governed by Conservation Order No. 4320 _ _ - _ _ _ _ _ _ _ _ - . - _ _ _ _ _ _ . _ _ _ _ - 5 Well located proper distance from drilling unit_boundary- , - . _ - . - - - - -Yes - Conservation Order Nn. 4320 has no interwellspacing_restrictions, Wellbor_ewill be_ more than 500' from - - 6 Well located proper distance from other wells- - . _ - - - - Yes - - _ - - - - an_ external property line_whe[e_ownership or_landownershpchanges. _ - - - _ _ _ 7 Sufficient acreage available in_drilling unit_ . - _ _ _ _ - - - .. Yes ... - - -- - 8 If_deviated,is_wellboreplatincluded______________________.__ ___---.__ YeS----_ ______----_______---_______..-_ ------------------------------------- 9 Operatoronlyaffectedparty__________________ _________ -- -.-__Yes_..--- -- ._____. ------------------------------------------------------------- 10 Operatorhas-appropriate-bond in force ------- - --------- - -- ------YeS----- -- --- ----- --- --- ------------- -------- -- ----- ------...---- 11 Pe[mitcanbeissuedwithoutconservationorder___________________ _________YeS__-__. .__--_._ _-.._._-__._-.-_____..__----_- ------------------------ Appr Date 12 Permit_canbeissuedwithoutadministrative_approval________________ _________Yes_..-_ -_--__.._-___--._..._-__--_-.._--__--.-.-__--__....-____..__--.---- SFD 7!6!2005 13 Can permit be approved before 15-day wait Yes 14 Well located within area and strata authorized bglnjection Order # (put IQ# in_comments)-(Far_ NA_ - - .. - ... _ . - - - - - - - .. - . - - . - . 15 All wells within 4/4_rnile area of review identified (For service well only)- - - - - - -,- - - - - - --- - NA_ - _ - - _ _ . _ _ - 16 Pre-produced injector; duration of pre production Less than 3 months_(For service well only) - . NA_ --------------------------------------------------------------- 17 ACMP-Finding of Consistency-hasbeenissued-fgrthisproject___________ __________N_A___--- --_____.--_____-_--_--__ -- - - Engineering 18 Conductor string_provided _ - - - - Yes - - - - - - - - 19 Surface casing_protectsallknown-USDWs______________________ _________ NA___-_- -Allaquifersexempted,40CFR-147.102_(b)(3)._----____-----____._--.______--___ -_, 20 CMT-voladequate_tocirculate onconductor&surf-csg_______________ _______ _Yes_---- -______-.__..__--_...__ - - 21 CMT_vol, adeguate_to tie-in long string to surf csg_ _ , - - - - , - No_ Annular disposal may be proposed. -All-hydrocarbon zones to_ be_coyered. _ . - . - - - .. _ 22 CMT-willcoyerall known-pfoductivehorizon_s_____________________ ________ _N_o__----- _Slotfedlinercompletionplanned,_______----______-________,--__ __--____-_-.,_ 23 CasingdesynsadepuateforC,_T,B&_permafrost------------------ ------ --Yes------ -----.---- -----.--- 24 Adequate tankage_or re_serue pit _ - - - - . _ -Yes - - Rig is_equipped with steel_pits.. No reserve_p_itplanned, All waste to approved annulus or disposal well.- - 25 Ifa_re-drill,has_a1.0-403 for abandonment been approved____________ _________ NA---_____ ___---_______--.,__ ------------------------------------------------- 26 Adequate wellbore separation-proposed_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes - - _ - - - -Proximity analysis performed, Traveling cylinder path calculated. Gyros likely to 1400', - _ _ _ _ _ _ _ _ - . _ _ - - . 27 If_diverterrequired,doesitmeetregulations______________________ _________Yes___- --.__ __..______._-._________-..__ ___..__-______.._______-_-____--_ Appr Date 28 Drilling Fluid-program schematic & equip list adequate- .. - - - _ Yes - - -Maximum expected formation pressure up to 9.4 EMW. Planned_ MW_up to 9.5 ppg in Kr~paruk. . - - TEM 7Rl2D05 29 BOPEs,dotheymeetregulation_____ Yes______ _________________________---___ __.._._______-.__ _________.._____ ~(~ ~, A 30 BOPE_press rating appropriate; test to-(put psig in comments)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Yes _ _ _ _ _ _ - MASP calculatedat 2497psi, 3500-psi-appropriate, CPAI_ normally tests to 50.00 psi._ - - - _ _ _ _ _ - _ - - _ _ _ - - 31 Choke-manifold comp_Iies w/API_RP-53 [May 84) - - Yes - - - - - - 32 Work willoccurwithoutoperationshutdown_________________-__ _____,---Yes-___-- ---_____.----____.-----_______- 33 Is presence_of H2S gas-probaple - _ - - - - - - -Yes - - H2S is present on C pad. _Mud-should preclude H2S on rig._ Rig is_equippedwith sensors and alarms.- , - I, 34 Mechanical condition of wells within AOR verified ~Fo[service well only) NA- - - - Geology 35 Permit can be issued wlo hydrogen_ s_ul_fide measures No- - _ _ _ _ - _ Offset 1C-Pad wells measured fr_om]0 to 90 ppm H2S_ on,813D12005. _ _ - 36 Data_presented on_ potential oye_rpressure zones - - _ Yes .. Expected r_eservoirpressu_re is 7,3.to 9.4 ppg EMW; will be drilled wilh_ 9.2 to 9,5 ppg mud.- HRZ may be up to_ - Appr Date 37 Seismic analysis ofshallow gas_zones- - - . NA_ 10.0 ppg EMW; will be_drilled.with 9,6 to 10.0 ppg-mud, . SFD 7!6/2005 38 Seabed condition survey-(ifoff-shore) _ - - - _ _ . NA- - 39 Contact namelphonefor_weekly progress reports [exploratory only]- - _ _ , NA - Geologic i i Engineering c Dat Date e: i Date oner: s~s /~Co(m~m' ~`" V .~ oner: ommi ner ~j Commiss l 7~6 / /~ ~~ I` `,~~ y • Well History File APPENDIX • Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Weli History frle and to simplify finding information, infom~ation of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. A Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Thu Jan 19 14:55:44 2006 Reel Header Service name .............LISTPE Date .....................06/01/19 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library Tape Header Service name .............LISTPE Date .....................06/01/19 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................ST5 LIS Writing Library. 1 ~43~ app --104- Scientific Technical Services Scientific Technical Services Physical EOF Comment Record TAPE HEADER Kuparuk River Unit MWD/MAD LOGS WELL NAME: 1C-28 API NUMBER: 500292327000 OPERATOR: ConocoPhillips Alaska, Inc. LOGGING COMPANY: Sperry Drilling Services TAPE CREATION DATE: 19-JAN-06 JOB DATA MWD RUN 4 MWD RUN 5 MWD RUN 6 JOB NUMBER: MW0003922104 MW0003922104 MW0003922104 LOGGING ENGINEER: B. HENNINGSE B. HENNINGSE B. HENNINGSE OPERATOR WITNESS: G. WHITLOCK G. WHITLOCK G. WHITLOCK MWD RUN 7 MWD RUN 8 MWD RUN 9 JOB NUMBER: MW0003922104 MW0003922104 MW0003922104 LOGGING ENGINEER: P. SMITH P. SMITH P. SMITH OPERATOR WITNESS: F. HERBERT F. HERBERT F. HERBERT MWD RUN 10 MWD RUN 12 MWD RUN 14 JOB NUMBER: MW0003922104 MW0003922104 MW0003922104 LOGGING ENGINEER: P. SMITH B. HENNINGSE P. SMITH OPERATOR WITNESS: F. HERBERT G. WHITLOCK F. HERBERT MWD RUN 15 JOB NUMBER: MW0003922104 LOGGING ENGINEER: P. SMITH OPERATOR WITNESS: F. HERBERT SURFACE LOCATION SECTION: 12 TOWNSHIP: 11N f RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: l0E 1548 1114 100.90 60.60 WELL CASING RECORD OPEN HOLE BIT SIZE (IN) 1ST STRING 9.875 2ND STRING 6.750 3RD STRING PRODUCTION STRING REMARKS: CASING DRILLERS SIZE (IN) DEPTH (FT) 10.750 9221.0 7.625 14781.0 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELLBORE IS AN OPENHOLE SIDETRACK, EXITING 1C-28 L1 AT 15115'MD. 4. MWD RUNS 1-3 WERE DIRECTIONAL ONLY - NO DATA ARE PRESENTED. 5. MWD RUNS 4-10,12,14-15 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS; ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4); AND PRESSURE-WHILE-DRILLING (PWD). MWD RUNS 12,14,15 ALSO INCLUDED COMPENSATED THERMAL NEUTRON POROSITY (CTN) AND AZIMUTHAL LITHO- DENSITY (ALD) MWD RUN 14 INCLUDED AT-BIT INCLINATION (ABI) MWD RUNS 4-7, 12,15 INCLUDED GEO-PILOT ROTARY STEERABLE BHA (GP). THE EWR SENSORS DID NOT EXIT THE CASING ON RUN 4 - NO DATA ARE PRESENTED. NO DATA WERE ACQUIRED ON RUNS 11 AND 13. 6. DEPTH SHIFTING OF MWD DATA WAS WAIVED PER E-MAIL, DATED 12/16/04, FROM M. WERNER (CPAI) TO R. KALISH (SDS) MWD DATA ARE CONSIDERED PDC. 7. MWD RUNS 4-10,12,14-15 REPRESENT WELL 1C-28 WITH API#: 50-029-23270-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 19367'MD/6560'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME (DEEP SPACING). TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE MATRIX, FIXED HOLE SIZE). CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN). SCO2 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN). SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. SLDSLIDE NON-ROTATED INTERVALS REFLECTING SENSOR DEPTHS. PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: 6.75" MUD WEIGHT: 9.1 - 9.5 PPG MUD SALINITY: 11,500 - 23,000 PPM CHLORIDES FORMATION WATER SALINITY: 11,000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE File Header Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 9203.0 19309.0 RPD 9215.5 19316.0 RPS 9215.5 19316.0 FET 9215.5 19316.0 RPX 9215.5 19316.0 RPM 9215.5 19316.0 ROP 9237.5 19367.0 FCNT 14707.0 19281.0 NPHI 14707.0 19281.0 NCNT 14707.0 19281.0 PEF 14722.0 19295.0 DRHO 14722.0 19295.0 RHOB 14722.0 19295.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 4 9203.0 9257.0 MWD 5 9257.0 9622.0 MWD 6 9622.0 10537.0 MWD 7 10537.0 11065.0 MWD 8 11065.0 13400.0 MWD 9 13400.5 13612.0 MWD 10 13612.0 14800.0 MWD 12 14800.0 15115.0 MWD 14 15115.5 16001.0 MWD 15 16001.0 19367.0 REMARKS: MERGED MAIN PASS. Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FONT MWD CNTS 4 1 68 4 2 NCNT MWD CNTS 4 1 68 8 3 RHOB MWD G/CM 4 1 68 12 4 DRHO MWD G/CM 4 1 68 16 5 RPD MWD OHMM 4 1 68 20 6 RPM MWD OHMM 4 1 68 24 7 RPS MWD OHMM 4 1 68 28 8 RPX MWD OHMM 4 1 68 32 9 FET MWD HOUR 4 1 68 36 10 GR MWD API 4 1 68 40 11 PEF MWD BARN 4 1 68 44 12 ROP MWD FT/H 4 1 68 48 13 NPHI MWD PU-S 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9203 19367 14285 20329 9203 19367 FCNT MWD CNTS 160.23 816 458.895 9149 14707 19281 NCNT MWD CNTS 15444.7 31380 24555.7 9149 14707 19281 RHOB MWD G/CM 0.437 3.357 2.3216 9147 14722 19295 DRHO MWD G/CM -3.052 0.934 0.0407736 9147 14722 19295 RPD MWD OHMM 1.05 2000 15.4272 20202 9215.5 19316 RPM MWD OHMM 1.01 2000 10.3986 20202 9215.5 19316 RPS MWD OHMM 1.32 1463.21 7.72316 20202 9215.5 19316 RPX MWD OHMM 1.02 1206.5 6.48628 20104 9215.5 19316 FET MWD HOUR 0.17 224.27 3.44945 20202 9215.5 19316 GR MWD API 33.36 437.72 108.563 20213 9203 19309 PEF MWD BARN 1.16 14.17 2.13942 9147 14722 19295 ROP MWD FT/H 0.03 1182.51 109.014 20260 9237.5 19367 NPHI MWD PU-S 10.84 51.28 24.9574 9149 14707 19281 First Reading For Entire File..........9203 Last Reading For Entire File...........19367 File Trailer Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.002 Physical EOF File Header Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9203.0 9222.0 ROP 9237.5 9257.0 LOG HEADER DATA DATE LOGGED: O1-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 9257.0 TOP LOG INTERVAL (FT) 9237.0 BOTTOM LOG INTERVAL (FT) 9257.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: .0 MAXIMUM ANGLE: .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 149206 EWR4 ELECTROMAG. RESIS. 4 66259 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 9.875 9221.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: LSND 9.50 54.0 9,7 800 6.0 1.800 75.0 .900 156.0 1.500 75.0 y ' i MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 1.900 75.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD040 API 4 1 68 4 2 ROP MWD040 FT/H 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9203 9257 9230 109 9203 9257 GR MWD040 API 56.85 98.1 70,6033 39 9203 9222 ROP MWD040 FT/H 2.04 107.09 41.5356 40 9237.5 9257 First Reading For Entire File..........9203 Last Reading For Entire File...........9257 File Trailer Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.003 Physical EOF File Header Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAw MwD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 .DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPD 9215.5 9580.0 RPX 9215.5 9580.0 FET 9215.5 9580.0 RPS 9215.5 9580.0 RPM 9215.5 9580.0 GR 9222.5 9588.0 ROP 9257.5 9622.0 LOG HEADER DATA DATE LOGGED: 02-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 9622.0 TOP LOG INTERVAL (FT) 9257.0 BOTTOM LOG INTERVAL (FT) 9622.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 70.2 MAXIMUM ANGLE: 70.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 119546 EWR4 ELECTROMAG. RESIS. 4 134760 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 9.875 DRILLER'S CASING DEPTH (FT) 9221.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G) 9.50 MUD VISCOSITY (S) 65.0 MUD PH: 9.5 MUD CHLORIDES (PPM): 600 FLUID LOSS (C3): 4.5 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) 1.900 69.0 MUD AT MAX CIRCULATING TERMPERATURE: 1.090 125.0 MUD FILTRATE AT MT: 1.350 69.0 MUD CAKE AT MT: 1.500 69.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: s Da ta Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down r ~ Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD050 OHMM 4 1 68 4 2 RPM MWD050 OHMM 4 1 68 8 3 RPS MWD050 OHMM 4 1 68 12 4 RPX MWD050 OHMM 4 1 68 16 5 FET MWD050 HOUR 4 1 68 20 6 GR MWD050 API 4 1 68 24 7 ROP MWD050 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9215.5 9622 9418.75 814 9215.5 9622 RPD MWD050 OHMM 1.05 2000 33.5605 730 9215.5 9580 RPM MWD050 OHMM 1.52 571.45 8.04449 730 9215.5 9580 RPS MWD050 OHMM 2.89 529.47 6.46708 730 9215.5 9580 RPX MWD050 OHMM 2.52 639.04 6.15347 730 9215.5 9580 FET MWD050 HOUR 0.49 158.62 12.6578 730 9215.5 9580 GR MWD050 API 78.65 121.39 102.918 732 9222.5 9588 ROP MWD050 FT/H 0.14 265.89 60.3897 730 9257.5 9622 First Reading For Entire File..........9215.5 Last Reading For Entire File...........9622 File Trailer Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/O1/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.004 Physical EOF File Header Service name .............STSLIB.004 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH r ~ ~ RPX 9580.5 10492.0 RPD 9580.5 10492.0 RPS 9580.5 10492.0 RPM 9580.5 10492.0 FET 9580.5 10492.0 GR 9588.5 10499.5 ROP 9622.5 10537.0 LOG HEADER DATA DATE LOGGED: 05-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Incite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 10537.0 TOP LOG INTERVAL (FT) 9622.0 BOTTOM LOG INTERVAL (FT) 10537.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 66.8 MAXIMUM ANGLE: 70.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 119546 EWR4 ELECTROMAG. RESIS. 4 134760 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 9.875 DRILLER'S CASING DEPTH (FT) 9221.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G) 9.60 MUD VISCOSITY (S) 80.0 MUD PH: 8.5 MUD CHLORIDES (PPM): 700 FLUID LOSS (C3) 3.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) 1.850 66.5 MUD AT MAX CIRCULATING TERMPERATURE: 20.020 122.0 MUD FILTRATE AT MT: 1.500 66.5 MUD CAKE AT MT: 1.550 66.5 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 e ' w Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD060 OHMM 4 1 68 4 2 RPM MWD060 OHMM 4 1 68 8 3 RPS MWD060 OHMM 4 1 68 12 4 RPX MWD060 OHMM 4 1 68 16 5 FET MWD060 HOUR 4 1 68 20 6 GR MWD060 API 4 1 68 24 7 ROP MWD060 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9580.5 10537 10058.8 1914 9580.5 10537 RPD MWD060 OHMM 3.08 51.8 5.99325 1824 9580.5 10492 RPM MWD060 OHMM 2.92 49.61 5.73837 1824 9580.5 10492 RPS MWD060 OHMM 2.78 51.03 5.44418 1824 9580.5 10492 RPX MWD060 OHMM 2.51 47.92 5.08302 1824 9580.5 10492 FET MWD060 HOUR 0.17 23.83 2.86977 1824 9580.5 10492 GR MWD060 API 68.2 158.99 96.1003 1823 9588.5 10499.5 ROP MWD060 FT/H 2.6 453.59 150.892 1830 9622.5 10537 First Reading For Entire File..........9580.5 Last Reading For Entire File...........10537 File Trailer Service name .............STSLIB.004 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.005 Physical EOF File Header Service name .............STSLIB.005 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPD 10492.5 11028.0 FET 10492.5 11028.0 RPS 10492.5 11028.0 RPM 10492.5 11028.0 RPX 10492.5 11028.0 GR 10500.0 11036.0 ROP 10537.5 11065.0 S LO G HEADER DATA DATE LOGGED: 06-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 11065.0 TOP LOG INTERVAL (FT) 10537.0 BOTTOM LOG INTERVAL (FT) 11065.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 56.4 MAXIMUM ANGLE: 64.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 119546 EWR4 ELECTROMAG. RESIS. 4 134760 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 9.875 DRILLER'S CASING DEPTH (FT) 9221.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G) 9.70 MUD VISCOSITY (S) 82.0 MUD PH: 8.5 MUD CHLORIDES (PPM): 500 FLUID LOSS (C3) 3.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) 1.450 72.0 MUD AT MAX CIRCULATING TERMPERATURE: .970 111.2 MUD FILTRATE AT MT: 1.300 72.0 MUD CAKE AT MT: 1.900 72.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD070 OHMM 4 1 68 4 2 RPM MWD070 OHMM 4 1 68 8 3 RPS MWD070 OHMM 4 1 68 12 4 RPX MWD070 OHMM 4 1 68 16 5 y I FET MWD070 HOUR 4 1 68 20 6 GR MWDO70 API 4 1 68 24 7 ROP MWD070 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10492.5 11065 10778.8 1146 10492.5 11065 RPD MWD070 OHMM 1.58 8.45 3.46835 1072 10492.5 11028 RPM MWD070 OHMM 1.59 9.95 3.3549 1072 10492.5 11028 RPS MWD070 OHMM 1.54 8.27 3.24377 1072 10492.5 11028 RPX MWD070 OHMM 1.45 7.19 3.15132 1072 10492.5 11028 FET MWD070 HOUR 0.17 33.15 3.25395 1072 10492.5 11028 GR MWD070 API 35.79 138.27 95.7149 1073 10500 11036 ROP MWD070 FT/H 23.69 907.61 194.937 1056 10537.5 11065 First Reading For Entire File..........10492.5 Last Reading For Entire File...........11065 File Trailer Service name .............STSLIB.005 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.006 Physical EOF File Header Service name .............STSLIB.006 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARI' VENDOR TOOL CODE START DEPTH STOP DEPTH RPM 11028.5 13400.0 RPD 11028.5 13400.0 RPX 11028.5 13400.0 RPS 11028.5 13400.0 FET 11028.5 13400.0 GR 11036.5 13400.0 ROP 11065.5 13400.0 LOG HEADER DATA DATE LOGGED: 11-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units......... .............. Datum Specification Block sub-type...0 Name Service Order DEPT RPD MWD080 RPM MWD080 RPS MWD080 RPX MWD080 FET MWD080 GR MWD080 ROP MWD080 Memory 13400.0 11065.0 13400.0 58.4 81.7 TOOL NUMBER 103770 134758 9.875 9221.0 LSND 10.20 64.0 9.5 500 2.3 1.500 85.0 20.330 141.4 1.400 70.0 1.860 70.0 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 OHMM 4 1 68 4 2 OHMM 4 1 68 8 3 OHMM 4 1 68 12 4 OHMM 4 1 68 16 5 HOUR 4 1 68 20 6 API 4 1 68 24 7 FT/H 4 1 68 28 8 First Last i ~ r Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 11028.5 13400 12214.3 4744 11028.5 13400 RPD MWD080 OHMM 1.7 1326.63 9.96415 4744 11028.5 13400 RPM MWD080 OHMM 1.71 224.41 8.89051 4744 11028.5 13400 RPS MWD080 OHMM 1.52 19.13 5.04472 4744 11028.5 13400 RPX MWD080 OHMM 1.29 11.1 3.97936 4744 11028.5 13400 FET MWD080 HOUR 0.22 32.96 1.28499 4744 11028.5 13400 GR MWD080 API 82.14 268.04 172.898 4728 11036.5 13400 ROP MWD080 FT/H 2.87 638.12 133.881 4670 11065.5 13400 First Reading For Entire File..........11028.5 Last Reading For Entire File...........13400 File Trailer Service name .............STSLIB.006 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.007 Physical EOF File Header Service name .............STSLIB.007 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ROP 13400.5 13612.0 GR 13400.5 13569.0 RPD 13400.5 13561.0 FET 13400.5 13561.0 RPM 13400.5 13561.0 RPX 13400.5 13561.0 RPS 13400.5 13561.0 LOG HEADER DATA DATE LOGGED: 15-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 13612.0 TOP LOG INTERVAL (FT) 13400.0 BOTTOM LOG INTERVAL (FT) 13612.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 65.6 MAXIMUM ANGLE: 71.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 103770 EWR4 ELECTROMAG. RESIS. 4 134758 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 9.875 DRILLER'S CASING DEPTH (FT) 9221.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G) 10.20 MUD VISCOSITY (S) 68.0 MUD PH: 10.0 MUD CHLORIDES (PPM): 500 FLUID LOSS (C3) 3.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) 1.970 65.0 MUD AT MAX CIRCULATING TERMPERATURE: 1.010 133.0 MUD FILTRATE AT MT: 2.500 65.0 MUD CAKE AT MT: 1.950 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD090 OHMM 4 1 68 4 2 RPM MWD090 OHMM 4 1 68 8 3 RPS MWD090 OHMM 4 1 68 12 4 RPX MWD090 OHMM 4 1 68 16 5 FET MWD090 HOUR 4 1 68 20 6 GR MWD090 API 4 1 68 24 7 ROP MWD090 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13400.5 13612 13506.3 424 13400.5 13612 RPD MWD090 OHMM 1.38 31.64 11.3566 322 13400.5 13561 RPM MWD090 OHMM 1.48 32.41 11.5533 322 13400.5 13561 RPS MWD090 OHMM 1.32 11.97 6.61857 322 13400.5 13561 RPX MWD090 OHMM 1.13 7.7 4.97255 322 13400.5 13561 FET MWD090 HOUR 0.95 3.97 2.42578 322 13400.5 13561 GR MWD090 API 70.76 208.85 138.635 338 13400.5 ROP MWD090 FT/H 0.03 1182.51 75.2153 424 13400.5 First Reading For Entire File..........13400.5 Last Reading For Entire File...........13612 File Trailer Service name .............STSLIB.007 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/O1/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.008 Physical EOF File Header Service name .............STSLIB.008 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPX 13561.5 14748.5 FET 13561.5 14748.5 RPM 13561.5 14748.5 RPD 13561.5 14748.5 RPS 13561.5 14748.5 GR 13569.5 14756.5 ROP 13612.5 14800.0 LOG HEADER DATA DATE LOGGED: 18-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 14800.0 TOP LOG INTERVAL (FT) 13612.0 BOTTOM LOG INTERVAL (FT) 14800.0 BIT ROTATING SPEED (RPM) HOLE INCLINATION (DEG MINIMUM ANGLE: 64.6 MAXIMUM ANGLE: 82.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 103770 EWR4 ELECTROMAG. RESIS. 4 134758 13569 13612 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 6.750 DRILLER'S CASING DEPTH (FT) 9221.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G) 10.20 MUD VISCOSITY (S) 61.0 MUD PH: 9.4 MUD CHLORIDES (PPM): 500 FLUID LOSS (C3) 2.4 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) 2.700 65.0 MUD AT MAX CIRCULATING TERMPERATURE: .610 311.0 MUD FILTRATE AT MT: 1.960 65.0 MUD CAKE AT MT: 1.970 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD100 OHMM 4 1 68 4 2 RPM MWD100 OHMM 4 1 68 8 3 RPS MWD100 OHMM 4 1 68 12 4 RPX MWD100 OHMM 4 1 68 16 5 FET MWD100 HOUR 4 1 68 20 6 GR MWD100 API 4 1 68 24 7 ROP MWD100 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13561.5 14800 14180.8 2478 13561.5 14800 RPD MWD100 OHMM 1.9 42.39 5.96477 2375 13561.5 14748.5 RPM MWD100 OHMM 1.89 24.09 5.99685 2375 13561.5 14748.5 RPS MWD100 OHMM 1.64 13.56 4.47449 2375 13561.5 14748.5 RPX MWD100 OHMM 1.58 13.12 3.77971 2375 13561.5 14748.5 FET MWD100 HOUR 0.4 41.64 1.43458 2375 13561.5 14748.5 GR MWD100 API 46.16 437.72 176.747 2375 13569.5 14756.5 ROP MWD100 FT/H 1.7 447.72 78.6524 2376 13612.5 14800 First Reading For Entire File..........13561.5 Last Reading For Entire File...........14800 ~ ~ r File Trailer Service name .............STSLIB.008 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.009 Physical EOF File Header Service name .............STSLIB.009 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.008 Comment Record FILE HEADER FILE NUMBER: 9 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 12 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FCNT 14707.0 15115.0 NPHI 14707.0 15115.0 NCNT 14707.0 15115.0 RHOB 14722.0 15115.0 DRHO 14722.0 15115.0 PEF 14722.0 15115.0 RPS 14749.0 15115.0 FET 14749.0 15115.0 RPD 14749.0 15115.0 RPM 14749.0 15115.0 RPX 14749.0 15115.0 GR 14757.0 15115.0 ROP 14800.5 15115.0 LOG HEADER DATA DATE LOGGED: 28-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 15115.0 TOP LOG INTERVAL (FT} 14800.0 BOTTOM LOG INTERVAL (FT) 15115.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 86.8 MAXIMUM ANGLE: 95.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 178513 CTN COMP THERMAL NEUTRON 10603684 EWR4 Electromag Resis. 4 159439 ALD Azimuth. Litho-Den 105089 f •~ w BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 6.750 DRILLER'S CASING DEPTH (FT) 14781.0 BOREHOLE CONDITIONS MUD TYPE: Flo-Pro MUD DENSITY (LB/G) 9.20 MUD VISCOSITY (S) 70.0 MUD PH: 8.3 MUD CHLORIDES (PPM): 21500 FLUID LOSS (C3): 3.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 1.800 68.0 MUD AT MAX CIRCULATING TERMPERATURE: .890 144.3 MUD FILTRATE AT MT: 2.600 68.0 MUD CAKE AT MT: 3.000 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD120 CNTS 4 1 68 4 2 NCNT MWD120 CNTS 4 1 68 8 3 RHOB MWD120 G/CM 4 1 68 12 4 DRHO MWD120 G/CM 4 1 68 16 5 RPD MWD120 OHMM 4 1 68 20 6 RPM MWD120 OHMM 4 1 68 24 7 RPS MWD120 OHMM 4 1 68 28 8 RPX MWD120 OHMM 4 1 68 32 9 FET MWD120 HOUR 4 1 68 36 10 GR MWD120 API 4 1 68 40 11 PEF MWD120 BARN 4 1 68 44 12 ROP MWD120 FT/H 4 1 68 48 13 NPHI MWD120 PU-S 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 14707 15115 14911 817 14707 15115 FCNT MWD120 CNTS 160.23 530.78 409:827 817 14707 15115 NCNT MWD120 CNTS 15444.7 26508.3 23024.7 817 14707 15115 RHOB MWD120 G/CM 0.437 3.357 2.17399 787 14722 15115 DRHO MWD120 G/CM -3.052 0.934 -0.139529 787 14722 15115 RPD MWD120 OHMM 7.36 2000 141.335 733 14749 15115 << RPM MWD120 OHMM 1.01 2000 46.339 733 14749 15115 RPS MWD120 OHMM 1.34 1463.21 14.2284 733 14749 15115 RPX MWD120 OHMM 1.02 1206.5 9.86596 733 14749 15115 FET MWD120 HOUR 0.31 224.27 34.4679 733 14749 15115 GR MWD120 API 33.36 80.57 59.0306 717 14757 15115 PEF MWD120 BARN 1.34 14.17 3.64554 787 14722 15115 ROP MWD120 FT/H 0.82 1026.18 126.802 630 14800.5 15115 NPHI MWD120 PU-S 26.89 51.28 32.3402 817 14707 15115 First Reading For Entire File..........14707 Last Reading For Entire File...........15115 File Trailer Service name .............STSLIB.009 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.010 Physical EOF File Header Service name .............STSLIB.010 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.009 Comment Record FILE HEADER FILE NUMBER: 10 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 14 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH NCNT 15115.5 15907.5 FCNT 15115.5 15907.5 RPS 15115.5 15951.0 RPX 15115.5 15951.0 FET 15115.5 15951.0 NPHI 15115.5 15907.5 RPM 15115.5 15951.0 GR 15115.5 15944.0 RHOB 15115.5 15922.5 PEF 15115.5 15922.5 ROP 15115.5 16001.0 RPD 15115.5 15951.0 DRHO 15115.5 15922.5 LOG HEADER DATA DATE LOGGED: 04-NOV-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 16001.0 s ~ ~ +~ TOP LOG INTERVAL (FT) 15115.0 BOTTOM LOG INTERVAL (FT) 16001.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 87.2 MAXIMUM ANGLE: 91.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 156435 CTN COMP THERMAL NEUTRON 10603684 EWR4 Electromag Resis. 4 153663 ALD Azimuth. Litho-Den 105089 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 6.750 DRILLER'S CASING DEPTH (FT) 14781.0 BOREHOLE CONDITIONS MUD TYPE: Flo-Pro MUD DENSITY (LB/G): 9.10 MUD VISCOSITY (S) 68.0 MUD PH: 9,p MUD CHLORIDES (PPM): 23000 FLUID LOSS (C3): 3.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) .420 68.0 MUD AT MAX CIRCULATING TERMPERATURE: .210 141.0 MUD FILTRATE AT MT: .260 68.0 MUD CAKE AT MT: .600 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FONT MWD140 CNTS 4 1 68 4 2 NCNT MWD140 CNTS 4 1 68 8 3 RHOB MWD140 G/CM 4 1 68 12 4 DRHO MWD140 G/CM 4 1 68 16 5 RPD MWD140 OHMM 4 1 68 20 6 RPM MWD140 OHMM 4 1 68 24 7 RPS MWD140 OHMM 4 1 68 28 8 RPX MWD140 OHMM 4 1 68 32 9 FET MWD140 HOUR 4 1 68 36 10 GR MWD140 API 4 1 68 40 11 PEF MWD140 BARN 4 1 68 44 12 ~ !~ M ROP MWD140 FT/H 4 1 68 48 13 NPHI MWD140 PU-S 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 15115.5 16001 15558.3 1772 15115.5 16001 FCNT MWD140 CNTS 357 599 459.933 1585 15115.5 15907.5 NCNT MWD140 CNTS 20391 28890 24334.6 1585 15115.5 15907.5 RHOB MWD140 G/CM 2.141 2.882 2.32396 1615 15115.5 15922.5 DRHO MWD140 G/CM -0.131 0.515 0.075408 1615 15115.5 15922.5 RPD MWD140 OHMM 6.69 15.08 9.53411 1672 15115.5 15951 RPM MWD140 OHMM 6.05 14.4 9.15765 1672 15115.5 15951 RPS MWD140 OHMM 5.78 15.14 8.98931 1672 15115.5 15951 RPX MWD140 OHMM 4.61 14.66 7.77041 1672 15115.5 15951 FET MWD140 HOUR 0.45 104.81 2.91819 1672 15115.5 15951 GR MWD140 API 40.51 78.68 61.6068 1658 15115.5 15944 PEF MWD140 BARN 1.2 5.96 1.85591 1615 15115.5 15922.5 ROP MWD140 FT/H 0.63 620.31 96.8135 1772 15115.5 16001 NPHI MWD140 PU-S 10.84 23.77 18.7593 1585 15115.5 15907.5 First Reading For Entire File....,.....15115.5 Last Reading For Entire File...........16001 File Trailer Service name .............STSLIB.010 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name.,.........STSLIB.011 Physical EOF File Header Service name .............STSLIB.011 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.010 Comment Record FILE HEADER FILE NUMBER: 11 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 15 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH NPHI 15908.0 19281.0 FCNT 15908.0 19281.0 NCNT 15908.0 19281.0 PEF 15923.0 19295.0 DRHO 15923.0 19295.0 RHOB 15923.0 19295.0 GR 15944.5 19309.0 RPD 15951.5 19316.0 RPS 15951.5 19316.0 r •~ ~ RPX 15951.5 19316.0 FET 15951.5 19316.0 RPM 15951.5 19316.0 ROP 16001.5 19367.0 LOG HEADER DATA DATE LOGGED: 08-NOV-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 19367.0 TOP LOG INTERVAL (FT) 16001.0 BOTTOM LOG INTERVAL (FT) 19367.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: g2,2 MAXIMUM ANGLE: 95.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 178513 CTN COMP THERMAL NEUTRON 10603684 EWR4 Electromag Resis. 4 159439 ALD Azimuth. Litho-Den 105089 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 6.750 DRILLER'S CASING DEPTH (FT) 14781.0 BOREHOLE CONDITIONS MUD TYPE: FLO PRO MUD DENSITY (LB/G) 9.20 MUD VISCOSITY (S) 71.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 22000 FLUID LOSS (C3) 3,2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) .330 68.0 MUD AT MAX CIRCULATING TERMPERATURE: .160 152.6 MUD FILTRATE AT MT: .350 68.0 MUD CAKE AT MT: .290 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type .................<0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 1 ~_ Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD150 CNTS 4 1 68 4 2 NCNT MWD150 CNTS 4 1 68 8 3 RHOB MWD150 G/CM 4 1 68 12 4 DRHO MWD150 G/CM 4 1 68 16 5 RPD MWD150 OHMM 4 1 68 20 6 RPM MWD150 OHMM 4 1 68 24 7 RPS MWD150 OHMM 4 1 68 28 8 RPX MWD150 OHMM 4 1 68 32 9 FET MWD150 HOUR 4 1 68 36 10 GR MWD150 API 4 1 68 40 11 PEF MWD150 BARN 4 1 68 44 12 ROP MWD150 FT/H 4 1 68 48 13 NPHI MWD150 PU-S 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 15908 19367 17637.5 6919 15908 19367 FCNT MWD150 CNTS 298 816 464.593 6747 15908 19281 NCNT MWD150 CNTS 20665 31380 24793 6747 15908 19281 RHOB MWD150 G/CM 2.159 2.829 2.33826 6745 15923 19295 DRHO MWD150 G/CM -0.16 0.224 0.0535183 6745 15923 19295 RPD MWD150 OHMM 5.97 28.7 13.0576 6730 15951.5 19316 RPM MWD150 OHMM 5.18 38.18 11.9939 6730 15951.5 19316 RPS MWD150 OHMM 4.39 29.54 11.2548 6730 15951.5 19316 RPX MWD150 OHMM 3.8 20.92 9.5447 6730 15951.5 19316 FET MWD150 HOUR 0.53 44.25 1.67823 6730 15951.5 19316 GR MWD150 API 41.47 82.82 60.8971 6730 15944.5 19309 PEF MWD150 BARN 1.16 5.88 2.03157 6745 15923 19295 ROP MWD150 FT/H 4.85 388.24 86.9656 6732 16001.5 19367 NPHI MWD150 PU-S 17.18 33.97 25.5195 6747 15908 19281 First Reading For Entire File..........15908 Last Reading For Entire File...........19367 File Trailer Service name .............STSLIB.011 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.012 Physical EOF Tape Trailer Service name .............LISTPE Date .....................06/01/19 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Reel Trailer Service name .............LISTPE Date .....................06/01/19 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Writing Library. Scientific Technical Services ,~ • Next Reel Name...........UNKNdWN Comments ............. ••.STS LIS Writing Library. Physical EOF Physical EOF,. • Scientific Technical Services End Of LIS Fide • Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Fri Jan 20 09:06:52 2006 Reel Header Service name .............LISTPE Date .....................06/01/20 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library Tape Header Service name .............LISTPE Date .....................06/O1/20 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Library. • 134 34- c~` 05 - (U4--- Scientific Technical Services Scientific Technical Services Physical EOF Comment Record TAPE HEADER Kuparuk MWD/MAD LOGS WELL NAME: 1C-28 PB1 API NUMBER: 500292327070 OPERATOR: ConocoPhillips Alaska, Inc. LOGGING COMPANY: Sperry Drilling Services TAPE CREATION DATE: 20-JAN-06 JOB DATA MWD RUN 4 MWD RUN 5 MWD RUN 6 JOB NUMBER: MW0003922104 MW0003922104 MW0003922104 LOGGING ENGINEER: B. HENNINGSE B. HENNINGSE B. HENNINGSE OPERATOR WITNESS: G. WHITLOCK G. WHITLOCK G. WHITLOCK MWD RUN 7 MWD RUN 8 JOB NUMBER: MW0003922104 MW0003922104 LOGGING ENGINEER: P. SMITH P. SMITH OPERATOR WITNESS: F. HERBERT F. HERBERT SURFACE LOCATION SECTION: 12 TOWNSHIP: 11N RANGE: l0E FNL: 1548 FSL: FEL: FWL: 1114 ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: 100.90 GROUND LEVEL: 60.60 WELL CASING RECORD OPEN HOLE CASING DRILLERS 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.875 10.750 9221.0 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUNS 1-3 WERE DIRECTIONAL ONLY - NO DATA ARE PRESENTED. 4. MWD RUNS 4-8 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS; ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4); AND PRESSURE-WHILE-DRILLING (PWD) MWD RUNS 4-7 INCLUDED GEO-PILOT ROTARY STEERABLE BHA (GP) THE EWR SENSORS DID NOT EXIT THE CASING ON RUN 4 - NO DATA ARE PRESENTED. 5. DEPTH SHIFTING OF MWD DATA WAS WAIVED PER E-MAIL, DATED 12/16/04, FROM M. WERNER (CPAI) TO R. KALISH (SDS) MWD DATA ARE CONSIDERED PDC. 6. MWD RUNS 4-8 REPRESENT WELL 1C-28 PB1 WITH API#: 50-029-23270-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF 15202'MD/6515'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (DEEP SPACING). SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. File Header Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/20 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH ~ i GR 9203.0 15163.0 FET 9215.5 15155.5 RPD 9215.5 15155.5 RPM 9215.5 15155.5 RPS 9215.5 15155.5 RPX 9215.5 15155.5 ROP 9237.5 15202.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD BIT RUN NO MERGE TOP 4 9203.0 5 9257.0 6 9622.0 7 10537.0 8 11065.0 REMARKS: MERGED MAIN PASS. MERGE BASE 9257.0 9622.0 10537.0 11065.0 15202.0 Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record.............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9203 15202 12202.5 11999 9203 15202 ROP MWD FT/H 0.14 907.61 127.744 11930 9237.5 15202 GR MWD API 35.79 458.76 151.409 11921 9203 15163 RPX MWD OHMM 1.2 639.04 4.34176 11881 9215.5 15155.5 RPS MWD OHMM 1.48 529.47 5.20778 11881 9215.5 15155.5 RPM MWD OHMM 1.52 1809.23 9.15072 11881 9215.5 15155.5 RPD MWD OHMM 1.05 2000 12.4941 11881 9215.5 15155.5 FET MWD HOUR 0.17 158.62 2.45027 11881 9215.5 15155.5 First Reading For Entire File..........9203 Last Reading For Entire File...........15202 File Trailer Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/20 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.002 Physical EOF File Header Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/20 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9203.0 9222.0 ROP 9237.5 9257.0 LOG HEADER DATA DATE LOGGED: O1-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 9257.0 TOP LOG INTERVAL (FT) 9237.0 BOTTOM LOG INTERVAL (FT) 9257.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: .0 MAXIMUM ANGLE: .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 149206 EWR4 ELECTROMAG. RESIS. 4 66259 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 9.875 DRILLER'S CASING DEPTH (FT) 9221.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G) 9.50 MUD VISCOSITY (S) 54.0 MUD PH: 9.7 MUD CHLORIDES (PPM): 800 FLUID LOSS (C3) 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 1.800 75.0 MUD AT MAX CIRCULATTNG TERMPERATURE: .900 MUD FILTRATE AT MT: 1.500 MUD CAKE AT MT: 1.900 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 156.0 75.0 75.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9203 9257 9230 109 9203 9257 ROP MWD040 FT/H 2.04 107.09 41.5356 40 9237.5 9257 GR MWD040 API 56.85 98.1 70.6033 39 9203 9222 First Reading For Entire File..........9203 Last Reading For Entire File...........9257 File Trailer Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/20 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.003 Physical EOF File Header Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/20 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.002 Comment Record • • FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPX 9215.5 9580.0 RPS 9215.5 9580.0 RPM 9215.5 9580.0 RPD 9215.5 9580.0 FET 9215.5 9580.0 GR 9222.5 9588.0 ROP 9257.5 9622.0 LOG HEADER DATA DATE LOGGED: 02-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 9622.0 TOP LOG INTERVAL (FT) 9257.0 BOTTOM LOG INTERVAL (FT) 9622.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 70.2 MAXIMUM ANGLE: 70.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 119546 EWR4 ELECTROMAG. RESIS. 4 134760 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 9.875 9221.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: LSND 9.50 65.0 9.5 600 4.5 1.900 69.0 1.090 125.0 1.350 69.0 1.500 69.0 Data Format Specification Record Data Record Type ..................0 • Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD050 FT/H 4 1 68 4 2 GR MWD050 API 4 1 68 8 3 RPX MWD050 OHMM 4 1 68 12 4 RPS MWD050 OHMM 4 1 68 16 5 RPM MWD050 OHMM 4 1 68 20 6 RPD MWD050 OHMM 4 1 68 24 7 FET MWD050 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9215.5 9622 9418.75 814 9215.5 9622 ROP MWD050 FT/H 0.14 265.89 60.3897 730 9257.5 9622 GR MWD050 API 78.65 121.39 102.918 732 9222.5 9588 RPX MWD050 OHMM 2.52 639.04 6.15347 730 9215.5 9580 RPS MWD050 OHMM 2.89 529.47 6.46708 730 9215.5 9580 RPM MWD050 OHMM 1.52 571.45 8.04449 730 9215.5 9580 RPD MWD050 OHMM 1.05 2000 33.5605 730 9215.5 9580 FET MWD050 HOUR 0.49 158.62 12.6578 730 9215.5 9580 First Reading For Entire File..........9215.5 Last Reading For Entire File...........9622 File Trailer Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/20 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.004 Physical EOF File Header Service name .............STSLIB.004 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/O1/20 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 • FI LE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPX 9580.5 10492.0 FET 9580.5 10492.0 RPD 9580.5 10492.0 RPM 9580.5 10492.0 RPS 9580.5 10492.0 GR 9588.5 10499.5 ROP 9622.5 10537.0 LOG HEADER DATA DATE LOGGED: 05-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Incite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 10537.0 TOP LOG INTERVAL (FT) 9622.0 BOTTOM LOG INTERVAL (FT) 10537.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 66.8 MAXIMUM ANGLE: 70.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 119546 EWR4 ELECTROMAG. RESIS. 4 134760 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 9.875 DRILLER'S CASING DEPTH (FT) 9221.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G) 9.60 MUD VISCOSITY (S) 80.0 MUD PH: 8.5 MUD CHLORIDES (PPM): 700 FLUID LOSS (C3) 3.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) 1.850 66.5 MUD AT MAX CIRCULATING TERMPERATURE: 20.020 122.0 MUD FILTRATE AT MT: 1.500 66.5 MUD CAKE AT MT: 1.550 66.5 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD060 FT/H 4 1 68 4 2 GR MWD060 API 4 1 68 8 3 RPX MWD060 OHMM 4 1 68 12 4 RPS MWD060 OHMM 4 1 68 16 5 RPM MWD060 OHMM 4 1 68 20 6 RPD MWD060 OHMM 4 1 68 24 7 FET MWD060 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9580.5 10537 10058.8 1914 9580.5 10537 ROP MWD060 FT/H 2.6 453.59 150.892 1830 9622.5 10537 GR MWD060 API 68.2 158.99 96.1003 1823 9588.5 10499.5 RPX MWD060 OHMM 2.51 47.92 5.08302 1824 9580.5 10492 RPS MWD060 OHMM 2.78 51.03 5.44418 1824 9580.5 10492 RPM MWD060 OHMM 2.92 49.61 5.73837 1824 9580.5 10492 RPD MWD060 OHMM 3.08 51.8 5.99325 1824 9580.5 10492 FET MWD060 HOUR 0.17 23.83 2.86977 1824 9580.5 10492 First Reading For Entire File..........9580.5 Last Reading For Entire File...........10537 File Trailer Service name .............STSLIB.004 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/20 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.005 Physical EOF File Header Service name .............STSLIB.005 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/O1/20 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPD 10492.5 11028 0 RPX 10492.5 11028.0 RPM 10492.5 11028.0 FET 10492.5 11028.0 RPS 10492.5 11028.0 GR 10500.0 11036.0 ROP 10537.5 11065.0 LOG HEADER DATA DATE LOGGED: 06-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 11065.0 TOP LOG INTERVAL (FT) 10537.0 BOTTOM LOG INTERVAL (FT) 11065.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 56.4 MAXIMUM ANGLE: 64.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 119546 EWR4 ELECTROMAG. RESIS. 4 .134760 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 9.875 DRILLER'S CASING DEPTH (FT) 9221.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G) 9.70 MUD VISCOSITY (S) 82.0 MUD PH: 8.5 MUD CHLORIDES (PPM): 500 FLUID LOSS (C3) 3.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF} MUD AT MEASURED TEMPERATURE (MT) 1.450 72.0 MUD AT MAX CIRCULATING TERMPERATURE: .970 111.2 MUD FILTRATE AT MT: 1.300 72.0 MUD CAKE AT MT: 1.900 72.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD070 FT/H 4 1 68 4 2 GR MWD070 API 4 1 68 8 3 ' ~ • RPX MWD070 OHMM 4 1 68 12 4 RPS MWD070 OHMM 4 1 68 16 5 RPM MWD070 OHMM 4 1 68 20 6 RPD MWD070 OHMM 4 1 68 24 7 FET MWD070 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10492.5 11065 10778.8 1146 10492.5 11065 ROP MWD070 FT/H 23.69 907.61 194.937 1056 10537.5 11065 GR MWD070 API 35.79 138.27 95.7149 1073 10500 11036 RPX MWD070 OHMM 1.45 7.19 3.15132 1072 10492.5 11028 RPS MWD070 OHMM 1.54 8.27 3.24377 1072 10492.5 11028 RPM MWD070 OHMM 1.59 9.95 3.3549 1072 10492.5 11028 RPD MWD070 OHMM 1.58 8.45 3.46835 1072 10492.5 11028 FET MWD070 HOUR 0.17 33.15 3.25395 1072 10492.5 11028 First Reading For Entire File..........10492.5 Last Reading For Entire File...........11065 File Trailer Service name .............STSLIB.005 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/20 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.006 Physical EOF File Header Service name .............STSLIB.006 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/20 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPD 11028.5 15155.5 RPM 11028.5 15155.5 RPS 11028.5 15155.5 RPX 11028.5 15155.5 FET 11028.5 15155.5 GR 11036.5 15163.0 ROP 11065.5 15202.0 LOG HEADER DATA DATE LOGGED: SOFTWARE 11-OCT-05 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order DEPT ROP MWD080 GR MWD080 RPX MWD080 RPS MWD080 RPM MWD080 RPD MWDO80 FET MWD080 Insite 66.37 Memory 15202.0 11065.0 15202.0 58.4 81.7 • TOOL NUMBER 103770 134758 9.875 9221.0 LSND 10.20 64.0 9.5 500 2.3 1.500 85.0 20.330 141.4 1.400 70.0 1.860 70.0 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 API 4 1 68 8 3 OHMM 4 1 68 12 4 OHMM 4 1 68 16 5 OHMM 4 1 68 20 6 OHMM 4 1 68 24 7 HOUR 4 1 68 28 8 • • First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 11028.5 15202 13115.3 8348 11028.5 15202 ROP MWD080 FT/H 1.14 638.12 120.407 8274 11065.5 15202 GR MWD080 API 52.03 458.76 175.548 8254 11036.5 15163 RPX MWD080 OHMM 1.2 23.01 4.17235 8255 11028.5 15155.5 RPS MWD080 OHMM 1.48 26.11 5.29923 8255 11028.5 15155.5 RPM MWD080 OHMM 1.71 1809.23 10.7552 8255 11028.5 15155.5 RPD MWD080 OHMM 1.7 2000 13.2397 8255 11028.5 15155.5 FET MWD080 HOUR 0.22 32.96 1.35055 8255 11028.5 15155.5 First Reading For Entire File..........11028.5 Last Reading For Entire File...........15202 File Trailer Service name .............STSLIB.006 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/20 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.007 Physical EOF Tape Trailer Service name .............LISTPE Date .....................06/01/20 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library Reel Trailer Service name .............LISTPE Date .....................06/01/20 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Writing Library. Physical EOF Physical EOF Scientific Technical Services Scientific Technical Services End Of LIS File