Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout205-173r i DATA SUBMITTAL COMPLIANCE REPORT 1 /29/2008 Permit to Drill 2051730 Well Name/No. KUPARUK RIV UNIT 1C-28L1 Operator CONOCOPHILLIPS ALASKA INC MD 15378 TVD 6501 Completion Date 11/17/2005 Completion Status 1-OIL Current Status 1-OIL REQUIRED INFORMATION Mud Log No DATA INFORMATION Types Electric or Other Log s Run: GR/Res., Dens/Neu Well Log Information: Log/ Electr Data Digital Dataset Type ed/Frmt Number Name og Gas Analysis D Asc Directional Survey Ffd''~ D Lis 13435 Induction/Resistivity ', Rot 13435 Induction/Resistivity W /ell Cores/Samples Information: Name (data taken from Logs Portion of Master Well Data Maint Log Log Run Interval OH / Scale Media No Start Stop CH Received Comments 1 Blu 1 100 4410 Open 1/29/2007 Gas lift survey, Spin, Gradiom Pres, GR, CCL 16-Jan-2007 0 0 1/17/2006 DEFINITIVE SURVEY 9203 15320 1/31/2006 GR/EWR4/CNP/SLD/ROP/ PWD/GEOPILOT 9203 15320 1/31/2006 GR/EWR4/CNP/SLD/ROP/ PWD/GEOPILOT Sample Interval Set Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? / N Chips Received? _~LLP!-~` Analysis ,..~L/-Pd~'-"" Received? Comments: Compliance Reviewed By: Samples No API No. 50-029-23270-50-00 UIC N Directional Daily History Received? Y / N Formation Tops ~ N Date: 01 /24/07 ~clumh~rg~r Schlumberger -DCS 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ~ _. ~ _., ~ ~ a I, ~j ~~ 4~..:__ ....r _.,., ~ , ~,gf~~~ ", ~ ~~Q~ ~~ ~.J ~ "I Well Job # Log Description NO. 4121 Company: Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Kuparuk Date BL Color CD 1 C-111 11415647 RST WFL 10/29106 1 2B-01 11536780 PROD PROFILE 01/04/07 1 2H-11 11539477 PROD PROFILE 01/04107 1 2B-02 11538781 PROD PROFILE 01/05!07 1 3N-1.9 11538782 PROD PROFILE 01106/07 1 2W-O6 11538784 PROD PROFILE 01/08/07 1 1C-28 L1 NIA GLS 01116/07 1 2M-06 11628958 INJECTION PROFILE 01/20/07 1 1C-117 11628954 INJECTION PROFILE 01118/07 1 2K-16 11638814 PRODUCTION PROFILE 01/22107 1 1Y-22 11638815 PRODUCTION PROFILE 01/23/07 1 2N-337A NIA SBHP SURVEY 01/21107 1 2M-28 NIA SBHP SURVEY 01/21107 1 2M-03 NIA INJECTION PROFILE 01122/07 1 Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. \4\ i • WELL LOG TRANSMITTAL To: State of Alaska January 23, 2006 Alaska Oil and Gas Conservation Comm. Attn.: Ceresa Tolley 333 West 7t~' Avenue, Suite 100 _ Anchorage, Alaska I ~~~~ X05- I`~3 RE: MWD Formation Evaluation Logs 1C-28 L1, AK-MW-3922104 1 LDWG formatted Disc with verification listing. API#: 50-029-23270-60 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 Date: 131 jOCo Signed: RECEIVE' STATE OF ALASKA ~ JA N I 1 2006 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPOI~~k~1~ s~~ Commission 1a. Well Status: Oil ^ Gas Plugged ^ Abandoned Suspended WAG ^ 20AAC 25.105 20AAC 25.110 GINJ ^ WINJ ^ WDSPL ^ No. of Completions _ Other tb. Well Class: Development ^/ Exploratory ^ Service ^ Stratigraphic Test^ 2. Operator Name: ConocoPhillips Alaska, Inc. 5. Date Comp., Susp., or Aband.: November 17, 2005 12. Permit to Drill Number: 205-173 / 3. Address: P. O. Box 100360, Anchorage, AK 99510-0360 6. Date Spudded: zoos , Fl•o September 18, 299~t" 13. API Number: 50-029-23270-60 4a. Location of Well (Governmental Section): Surface: 1548' FNL, 1114' FWL, Sec. 12, T11 N, R10E, UM ~ 7. Date TD Reached: October 28, 2005 14. Well Name and Number: 1 C-28L1 At Top Productive Horizon: 261' FNL, 2758' FEL, Sec. 17, T11 N, R11 E, UM 8. KB Elevation (ft}: 40' RKB 15. Field/Pool(s): Kuparuk River Field Total Depth: 414' FNL, 2102' FEL, Sec. 17, T11 N, R11 E, UM 9. Plug Back Depth (MD + TVD): N/A Kuparuk Oil Pool 4b. Location of Well (State Base Plane Coordinates): Surtace: x- 562121 y- 5968689 Zone- 4 10. Total Depth (MD + TVD): • 15378' MD / 6501' TVD 16. Property Designation: ADL 25649, 28242, 28243 TPI: x- 573772 y- 5964802 Zone- 4 Total Depth: x- 574430 ' - 5964656 Zone- 4 11. Depth where SSSV set: nipple @ 507' 17. Land Use Permit: ALK 2292, 3814 18. Directional Survey: Yes ^~ No 19. Water Depth, if Offshore: N/A feet MSL 20. Thickness of Permafrost: 1956' MD L 2i. Logs Run: .'f ~ ~®/rlT ~ ~S f ''~..~/ ~,.~~~ .~> /~/$•G6 GR/Res, Dens/Neu [ae~ .SGtt,zyu~=c. dr~d~J ` 22. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 16" 165# X-42 40' 120' 40' 120' 42" 500 sx AS1 10.75" 45.5# L-80 40' 9222' 40' 4513' 13.5" 1076 sx ASLite, 590 sx LiteCrete 7-5/8" 29.7# L-80 40' 14781' ' 40' 6443' 9-7/8" 280 sx Class G 23. Perforations open to Production (MD + TVD of Top and Bottom 24. TUBING RECORD Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET n/a 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 14591'-15202' abandonment plug 280 sx Class G 13170'-13740' kick off plug 280 sx Class G 26. PRODUCTION TEST Date First Production December 29, 2005 Method of Operation (Flowing, gas lift, etc.) Gas Lift Oil -shares production with 1 C-28 Date of Test 1/1/2006 Hours Tested 5.5 hours Production for Test Period --> OIL-BBL 787 GAS-MCF 800 WATER-BBL 31 CHOKE SIZE 100 Bean GAS-oi~ RnTlo Flow Tubing press. 460 psi Casing Pressure 1240 Calculated 24-Hour Rate -> OIL-BBL 3195 GAS-MCF 3878 WATER-BBL 137 OIL GRAVITY -API (corr) not available 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". 6 f~l-FIB ~ @I LLVL ~~~~ ~-? OS . NONE ' -~~_~ ~~ Form 10-407 Revised 12/2003 ~~ ` ~ f ~ ~ t F ~ ~~ ! CONTINUED ON REVERSE ~~ 28. 29. GEOLOGIC MARKERS FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". 1 C-28L1 TD 15378' 6501' N/A 30. LIST OF ATTACHMENTS Summary of Daily Operations, Directional Survey 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Tim Billingsley @ 265-6531 Printed Na Ra Thom s Title: Greater Kuoaruk Area Drillino Team Leader _ t ~~ /~6 D t Si ~ a gnature e ne ~s 6' a3 ~ INSTRUCTIONS Prepared by Sharon Allsup-Drake General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: True vertical thickness. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 28: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other (explain). Item 27: If no cores taken, indicate "none". Item 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 r~ I-~I ConocoPhillips Alaska Page 1 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Nam e: ROT -D RILLIN G Start: 9/11/2005 End: Contractor Name: D15CM @conoc ophillip s.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 1 5 Rig Number: 15 Date From - To Hours Code Code Phase Description of Operations 9/11/2005 00:00 - 03:00 3.00 MOVE OTHR MOVE Release rig @ midnight 9!10/2005. f/ 5.1 mile move f/ 1E-170 to 1C-28. Move pits off of mats, move mats f/ pit module and spot on road. Blow down steam to sub module. 03:00 - 06:00 3.00 MOVE MOVE MOVE Move rig sub off of well 1 E-170. Stage rig down pad. Move pits down pad. 06:00 - 09:00 3.00 MOVE OTHR MOVE Remove Diverter system f/ cellar area. Clean up around cellar area, pick up mats and herculite. Stage mats on road. 09:00 - 10:30 1.50 MOVE MOVE MOVE Move small office/camp f/ 1 EPad to 1 C pad 5.1 miles. 10:30 - 11:30 1.00 MOVE MOVE MOVE Move rig off 1 E pad. 11:30 - 15:00 3.50 RIGMNT RGRP MOVE Trouble shoot and work on sub module moving system. 15:00 - 17:00 2.00 MOVE MOVE MOVE Move rig off 1 E pad. 17:00 - 17:30 0.50 MOVE RGRP MOVE Trouble shoot and work on sub module moving system. 17:30 - 18:00 0.50 MOVE MOVE MOVE Move rig off 1 E pad. 18:00,- 22:00 4.00 MOVE MOVE MOVE Move f/ 1 E pad towards 1 C pad. 22:00 - 22:15 0.25 MOVE OTHR MOVE Air up tire Left rear outside on drilling module f/ 115 Ib to 120?? lbs. 22:15 - 23:00 0.75 MOVE MOVE MOVE Move both modules. Right front outside tire went down on drilling module. 23:00 - 00:00 1.00 MOVE MOVE MOVE Set drilling module down. Pull out plywood. Fill hole w/ cut off 3" x 12" wood. Hook up Peak Sow to assist moving drilling module. Note: 1.4 mi to Spine Road 9/12/2005 00:00 - 00:30 0.50 MOVE MOVE MOVE Move drilling module about 50 yds after Right front wheels went through road. Left Rear wheels went down in road. 00:30 - 02:00 1.50 MOVE OTHR MOVE Cut 3" x 12" lumber for cribbing. Crib under Left rear wheels. Hook weighted Peak SOW to assist in pulling out drilling module. 02:00 - 03:00 1.00 MOVE MOVE MOVE Move sub ahead 50 yds, set on rig mats which were already layed. 03:00 - 13:30 10.50 MOVE OTHR MOVE Remove plywood f/ road so as to lay mats where standing water was by road. 13:30 - 14:30 1.00 MOVE MOVE MOVE Moving drilling module w/ Peak Sow assisting to Flare pit behind CPF 1. Unhook SOW. 14:30 - 16:30 2.00 MOVE MOVE MOVE Move drilling module trough gravel pit, Hook up SOW to move up incline in gravel pit. Unhook SOW. 16:30 - 17:30 1.00 MOVE MOVE MOVE Move drilling module to in front of CPF1/ KOC. 17:30 - 18:00 0.50 MOVE OTHR MOVE Kuparuk crew change while sitting in front of KOC. Inspect moving system, tires, hinges, cylinder bolts, fuel module. 18:00 - 20:00 2.00 MOVE OTHR MOVE Continue trouble shooting throttle controls on drill module. Picking up plywood on road where drilling module fell through. Roads and pads repairing and compacting road where module fell through. Stagging mats to apply on road where compacted. 20:00 - 22:00 2.00 MOVE OTHR MOVE Lay approx 34 mats on road in area of water standing on side of road. 22:00 - 22:15 0.25 MOVE SFTY MOVE PJSM on moving pit module w/ toolpusher, tourpusher and crew. 22:15 - 22:45 0.50 MOVE MOVE MOVE Move pit module approx 1200'. Crew noticed a leak of hydraulic oil from right rear side of module in wheel welt. 22:45 - 00:00 1.25 RIGMNT RGRP MOVE Fix hydraulic leak on right rear of pit module. Replace pipe penetration through wall Note: Security was notified approx midnight and Environmental was notified. 9/13/2005 00:00 - 00:30 0.50 MOVE MOVE MOVE Finish fixing hydraulic leak on right rear of pit module. Replace pipe penetration through wall. Wipe very little oil on mats. 00:30 - 01:30 1.00 MOVE MOVE MOVE Move pit module to flare pit behind CPF1. 01:30 - 01:45 0.25 MOVE - MOVE MOVE Maneuver pit module around corner heading to gravel pit. 01:45 - 03:00 1.25 MOVE MOVE MOVE Move pit module through gravel pit to Spine road. 03:00 - 03:30 0.50 MOVE MOVE MOVE Move pits f/ spine road down to in front of CPF1 / KOC. 03:30 - 06:00 .2.50 MOVE MOVE MOVE Relocate mats to use on 1 C road. Check tires, drives, pumps, hinges Printed: 12/30/2005 9:34:03 AM • ~ ConocoPhillips Alaska Page 2 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date 9/13/2005 9/14/2005 19/15/2005 From - To Hours Code Code Phase 03:30 - 06:00 06:00 - 00:00 00:00 - 01:15 01:15 - 05:30 05:30 - 13:30 13:30 - 15:30 15:30 - 20:45 20:45 - 21:30 21:30 - 23:00 23:00 - 00:00 00:00 - 05:30 05:30 - 06:30 06:30 - 08:00 08:00 -12:00 2.50 MOVE 18.00 MOVE 1.25 MOVE 4.25 MOVE 8.00 MOVE 2.00 MOVE 5.25 MOVE 0.75 MOVE 1.50 MOVE 1.00 MOVE 5.50 MOVE 1.00 MOVE 1.50 MOVE 4.00 MOVE MOVE MOVE -MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE MOVE. MOVE 12:00 - 13:30 1.50 MOVE MOVE MOVE 13:30 - 17:00 3.50 MOVE MOVE MOVE 17:00 - 18:30 1.50 MOVE MOVE MOVE 18:30 - 00:00 5.50 MOVE MOVE MOVE 9/16/2005 00:00 - 09:00 9.00 MOVE MOVE MOVE 09:00 - 10:30 10:30 - 13:00 13:00 - 15:00 15:00 - 17:30 17:30 - 18:00 18:00 - 18:45 18:45 - 20:30 20:30 - 00:00 9/17/2005 00:00 - 04:30 04:30 - 12:30 12:30 - 13:30 13:30 - 14:00 14:00 - 14:30 14:30 - 15:30 15:30 - 18:00 18:00 - 18:15 18:15 - 19:15 19:15 - 19:30 19:30 - 00:00 19/18/2005 00:00 - 02:00 02:00 - 03:30 03:30 - 04:30 1.50 MOVE MOVE MOVE 2.50 MOVE MOVE MOVE 2.00 MOVE -MOVE MOVE 2.501 MOVE I MOVE I MOVE 0.50 MOVE MOVE MOVE 0.75 RIGMNT RGRP MOVE 1.75 MOVE MOVE MOVE 3.50 MOVE RURD RIGUP 4.50 MOVE RURD RIGUP 8.00 MOVE RURD RIGUP 1.00 RIGMNT RSRV SURFAC 0.50 DRILL PULD SURFAC 0.50 DR1LL 1.00 RIGMt 2.50 DRILL 0.25 DRILL 1.00 DRILL PULD SURFAC RGRP SURFAC PULD SURFAC SFTY SURFAC SFTY SURFAC 0.25 DRILL 4.50 DRILL 2.00 DRILL 1.50 DRILL 1.001 DRILL SFTY SURFAC PULD SURFAC PULD SURFAC PULD SURFAC PULD (SURFAC Description of Operations and fuel day tanks. Set mats T/ KIC turn Off Set malts T/ KIC turn Off Move Rig F/ KCC T/ KIC Turn. Start Moving Mats around rig. Move Rig .8 Mile Move Malts around Move approximently 1/4 mile fell through road Crib Rig up and call for Trucks (sows) Try to pull out Could not pull Rig Out, Continue blocking up rig. Try to pull out Could not pull Rig Out, Continue blocking up rig. Rig Out Move Drill Module T/ Fire Training Pad, Clean Up Cribbing Remove matt at road damaged area Continue Moving Malts around to 1C access road. Fill in Damaged road- - with gravel and re-Matt Move Pit Module up to fire training pad. Laying Malts from fire training pad to 1 c access road double matting. Move Sub and Pit Modules up to Y at pipeline access and C pad Move Malts around to double matt Access road over Flow lines. Continued moving mats around modules and double matting from the 1 C pad turn off to 1 C pad Moved Doyon 15 drilling module on to 1C pad Moved Doyon 15 pit module on to 1C pad Picked up mats off road and finished matting area around 1 E-28 in preparation for spotting the drilling module and Turn Sub Module and Pit Module. i Moved drilling module in position over 1 C-28 Set Rear pedastal Close 'cellar doors, Re-Pin Wheels Walk Pit Module up on Malts Repair Hose on Hydrolic Steering Unit on Pits. Set Pits and skid rig over well, Hook Up Service All servise lines, and set Rock Washer, Hook Up Electrical lines. Berm Rig, & Rock washer, Set Cuttings tanks, Pin beaver slide, Set Parameters on Totco monitors. Rig Accepted @ 04;30. Start Nipple Up Diverter and fill Pits. Service Top Drive, Inspect Derrick, Install Mouse Hole, PJSM on Picking up 5" Drill Pipe. Loading Pipe Shed with drill Pipe. Pick Up 5" Drill Pipe and stand in Derrick total 6 joints. Iron Roughneck Down, Replaced hose on Iron Roughneck. Pick Up 5" Drill Pipe and stand in Derrick total 81 joints. Total 87jts PJSM: With day crew Diverter and Evacuation Drill. PJSM; Function test and Diverter and Evacuation drill With Night Crew. State Man -Jeff Jones Witnessed function Test, Koomey Test and Gas Alarms, Tested Totco Alarms. Post drill evaluation Good Response from Crew during Drill. Install Mouse Hole, PJSM on Picking up 5" Drill Pipe. Pick Up 5" Drill Pipe and stand in Derrick total 120 joints. Total 207 jts Pick Up 5" Drill Pipe and stand in Derrick total 63 joints. Total 270 jts Pick Up 5" HWT Drill Pipe and stand in Derrick total 20 joints and set Jars. Pick Up BHA Subs to rig floor, Fill Conductor and check surtace Printed: 12/30/2005 9:34:03 AM • • ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1 C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours Code Code Phase 9/18/2005 03:30 - 04:30 1.00 DRILL PULD SURFAC 04:30 - 07:00 2.50 RIGMNT RGRP SURFAC 07:00 - 08:30 1.50 DRILL PULD SURFAC 08:30 - 09:00 0.50 DRILL PULD SURFAC 09:00 - 10:00 1.00 DRILL PULD SURFAC 10:00 - 10:30 0.50 DRILL PULD SURFAC 10:30 - 11:00 0.50 .DRILL OTHR SURFAC 11:00 - 11:30 0.50 DRILL REAM SURFAC 11:30 -.12:30 1.00 DRILL DRLG SURFAC 12:30 - 13:00 0.50 DRILL TRIP SURFAC 13:00 - 14:00 1.00 DRILL PULD SURFAC 14:00 - 18:00 4.00 DRILL DRLG SURFAC 18:00 - 00:00 6.001 DRILL DRLG SURFAC 19/19/2005 00:00 - 05:15 5.25 DRILL DRLG ~ SURFAC 05:15 - 06:00 0.75 DRILL CIRC SURFAC 06:00 - 06:45 0.75 DRILL TRIP SURFAC 06:45 - 07:15 0.50 DRILL DRLG SURFAC 07:15 - 07:45 0.50 DRILL OTHR SURFAC 07:45 - 09:30 1.75 DRILL DRLG SURFAC 09:30 - 10:00 0.50 DRILL OTHR SURFAC 10:00 - 12:00 2.00 DRILL DRLG SURFAC 12:00 - 14:00 2.001 DRILL DRLG SURFAC Page 3 of 44 Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations equipment. Surface Equipment Leaking @ Bell Nipple take back off silicon and re-install Pick Up 3 Drill Collars, Hit obstuction @ 60' Rick up slick line in derrick for Gyro. Make Up BHA: Bit, Motor,Change bend To 1.5deg. MWD, Lay Down MWD Plug at 60' could not get through Make up HWDP top of Motor, Test Surface lines to 4,000psi. Clean Out conductor 60-120' Drill F/ 120' - T/ 224' to make room for BHA. Pull Out Hole. For Bha. M/U MWD, UBHO, Orientate, Flex Collars,Jars Directionally Drill and Gyro Survey: 13-1 /2" From 215' - To 585' AST=L22,ART=1.73, ADT2.95,UR.WT-105k, DN WT.-105k, Rot. Wt.105k, gpm= 515 @ 1450 psi on bottom, 1300 psi off bottom, 80 rpm, Torque= 4k on bottom, 3-4k off bottom, 370' Average Rate Penetration 125' per Hr. APIG 4hrs. 92.5' per Hr. Directionally Drill and Gyro Survey: 13-1/2" From 585' - To 1,010' M.D.1,004' TVD AST-2.27, ART-.91, ADT 3.18,Total Bit Hours 6.13hrs. UP WT-115k, DN WT.-115k, Rot. Wt.110k, GPM -582-700 @ 1450-1,640 psi on bottom, 1,100 -1,520 psi off bottom, 80 rpm, Torque= 4k on bottom, 3-4k off bottom, 425' Average Rate Penetration 133' per Hr. APIG 12.5hrs. 34' per Hr. Directionally Drill and Gyro Survey: 13-1/2" From 1,010' M.D. - To 1,388' M.D.1,365' TVD AST-3.65, ART-.44, ADT 4.09,Total Bit Hours 10.22hrs. UP WT-115k, DN WT:-115k, Rot. Wt.110k, GPM -582-700 @ 1,400 psi on bottom, 1,240 psi off bottom, 80 rpm, Torque= 4k on bottom, 3-4k off bottom, Feet Drilled 378' Average Rate Penetration 92.4' per Hr. APIG 17.50 hrs. 72.45' per Hr. Note: Seen gas high 260 units. 1,180' M.D. 1,167'TVD. Circulate Hole. Rig Down Wireline Gyro Pump Out Hole T/ 1,020' and Run Back in hole While availuating surveys. Directionally Drill: 13-1 /2" From 1,388' M.D. -To 1,444' M.D. Pick Up off Btm, Auger backed up and 15 gal OverFlowed into secondary containment. Clean up and Unplug. Directionally Drill: 13-1/2" From 1,444' M.D. -To 1,579' M.D. Clean Suction screens on Mud Pumps.#1-#2 Directionally Drill : 13-1/2" From 1,579' M.D. - To 1,770' M.D.1,701' TVD( All Peramiters and bit hours For Depthhs 1,388' - 1,770') AST-3.47, ART-.17, ADT 3.64,Total Bit Hours 13.86hrs. UP WT-130k, DN WT: 125k, Rot. Wt.130k, .GPM -615 @ 1,380 psi on bottom, 1,200 psi off bottom, 80 rpm, Torque= 4k on bottom, 3-4k off bottom, Feet Drilled 191' Average Rate Penetration 52' per Hr. Note: 376 units.1,540' M.D. Directionally Drill : 13-1/2" From 1,770' M.D.1,701' TVD -To 2,055' M.D. 1,925 TVD AST-1.16, ART-.00, ADT 1.16,Total Bit Hours 15.02hrs. UP WT-130k, DN WT.-125k, Rot. Wt.130k, GPM -615 @ 1,380 psi on bottom, 1,200 psi off bottom, 80 rpm, Torque= 4k on bottom, 3-4k off bottom, Feet Drilled 378' Average Rate Penetration 92.4' per Hr. Nnntea: iLSw[uuo a::ta:uswvi • ~ ConocoPhillips Alaska Page 4 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common W ell Name: 1C-28 Spud Date: 7/30/2005 Event Nam e: ROT -D RILLING Start: 9/11/2005 End: Contractor Name: D15CM @conoc ophillip s.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 1 5 Rig Number: 15 Date From - To Hours Code Cod Phase Description of Operations e 9/19/2005 12:00 - 14:00 2.00 DRILL DRLG SURFAC 14:00 - 14:45 0.75 DRILL CIRC SURFAC Circulate and Back Ream F/ 2,055' - T/ 1,963' To Knock down dogleg. 11deg, to 4deg.Clean Hole. 14:45 - 18:00 3.25 DRILL DRLG SURFAC Directionally Drill ; 13-1/2" From 2,055' M.D.1,925' TVD - To 2,370' M.D. 2,139' TVD AST-1.13, ART-.46, ADT-1.59,Total Bit Hours 16.61 hrs. UP WT-140k, DN WT.-130k, Rot. Wt.1120k, GPM -720 @ 2,160 psi on bottom, 2,100 psi off bottom, 80 rpm, Torque= 5k on bottom, 3-4k off bottom, Feet Drilled 315' Average Rate Penetration 198' per Hr. Note units.2225' M.D. 18:00 - 00:00 6.00 DRILL DRLG SURFAC Directionally Drill : 13-1/2" From 2,370' M.D. 2,139' TVD - To 3,102' M.D. 2,436' TVD AST-1.62, ART-2.62, ADT-4.25,Tota! Bit Hours 20.86 hrs. UP WT-140k, DN WT.-130k, Rot. Wt.1120k, GPM -720 @ 2,160 psi on bottom, 2,100 psi off bottom, 80 rpm, Torque= 5k on bottom, 3-4k off bottom, Feet Drilled 315' Average Rate Penetration 198' per Hr. APIG 34.75 hrs. 89.2' per Hr. Note: 506 units2,950' M.D. Back Ground Gas 380units Bring M.W. Up F/9.4ppg. - T/ 9.6ppg. 9/20/2005 00:00 - 06:00 6.00 DRILL DRLG SURFAC DRILL; 13 1/2" HOLE; F! 3,106'MD 2,436' TVD. - T / 3,862'MD 2,721'TVD UP WT:160K, DN WT:120K, ROT WT: 135K BIT: 4.20-ADT, 1.09-AST, 3.11-ART,25.10-TOTAL BIT HOURS, 20-30 WOB, 700-GPM,-2,150. ON BTM PRESS, 2,000-OFF BTM PRESS, 80-RPM, 6-10k TORQ ON BTM, 5k TORQ OFF BTM, 485 MAX GAS UNITS, 340 BACKGROUND GAS UNITS. W/ 9.4 MW 9.6 MW, 210VIS, 46 YP ~ 120 MAX GAS UNITS, 80-100 BACKGROUND W/ 9.6 MW I 760' FEET DRILLED, 180' AVERAGE ROP. TOTAL; 40.75HRS, 3,742' FEET DRILLED, 91.82 APIG 06:00 - 12:00 6.00 DRILL DRLG SURFAC DRILL; 13 1/2" HOLE; F/ 3,862 'MD 2,721' TVD. - T / 4,432'MD 2,923'TVD UP WT:165K, DN WT:115K, ROT WT: 140K BIT: 3.85-ADT, 1.15-AST, 2.7-ART, 28.95-TOTAL BIT HOURS, 20-30 WOB, 750-GPM, 2,700- ON BTM PRESS, 2,700-OFF BTM PRESS, 80-100 RPM, 14k TORO ON BTM, 10k TORO OFF BTM, 150 MAX GAS UNITS, 80 BACKGROUND GAS UNITS. 9.6 MW, 210VIS, 44 YP 570' FEET DRILLED, 148' AVERAGE ROP. TOTAL; 46.75HRS, 4,312' FEET DRILLED, 92.23 APIG 12:00 - 18:00 6.00 DRILL DRLG SURFAC DRILL; 13 1/2" HOLE; F/ 4,432 'MD 2,923' TVD. - T/ 5,004 'MD 3,113' TVD. UP WT:180K, DN WT:110K, ROT WT: 140K BIT: 3.85-ADT, 1.16-AST, 2.62-ART, 32.72-TOTAL BIT HOURS, 15-30 WOB, 750-GPM, 2,770- ON BTM PRESS, 2,700-OFF BTM PRESS, 80-100 RPM, 15k TORO ON BTM, 10k TORO OFF BTM, 150 MAX GAS UNITS, 80 BACKGROUND GAS UNITS. 9.5 MW, 195 VIS, 44 YP 572' FEET DRILLED, 148' AVERAGE ROP. TOTAL; 52.75HRS; 4884' FEET DRILLED, 92.58 APiG 18:00 - 00:00 6.00 DRILL DRLG SURFAC DRILL; 13 1/2" HOLE; F/ 5,004 'MD 3,113' TVD.- T/ 5,662 'MD 3,325' Pfintetl: 12/30/2005 9:34:03 AM • ~ ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date .From - To Hours Code Code Phase 9/20/2005 ~ 18:00 - 00:00 ~ 6.00 ~ DRILL ~ DRLG ~ SURFAC 19/21/2005 00:00 - 05:15 5.251 DRILL DRLG SURFAC 05:15 - 06:00 0.75 DRILL CIRC SURFAC 06:00 - 17:00 11.00 DRILL TRIP SURFAC 17:00 - 19:30 2.50 DRILL TRIP SURFAC 19:30 - 20:00 0.50 DRILL SFTY SURFAC 20:00 - 21:15 1.25 DRILL PULD SURFAC 21:15 - 21:45 21:45 - 23:15 0.50 DRILL TRIP SURFAC 1.50 DRILL TRIP SURFAC 23:15 - 00:00 9/22/2005 00:00 - 01:30 01:30 - 02:15 02:15 - 06:00 0.75 RIGMNT RSRV SURFAC 1.50 DRILL TRIP SURFAC 0.75 DRILL CIRC SURFAC 3.751 DRILL DRLG ~ SURFAC Page 5 of 44 Spud. Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations TVD. UP WT:180K, DN WT:110K, ROT WT: 140K BIT: 4.75-ADT, 1.03-AST, 3.11-ART, 37.47-TOTAL BIT HOURS, 20-30 WOB, 860-GPM, 3,420- ON BTM PRESS, 3,300-OFF BTM PRESS, 80-100 RPM, 15k TORQ ON BTM, 10k TORQ OFF BTM, 128 MAX GAS UNITS, 60 BACKGROUND GAS UNITS. 9.6 MW, 210VIS,58 YP, 95deg FLOW LINE TEMP. 658' FEET DRILLED,138.5' AVERAGE ROP. TOTAL; 58.75HRS, 5,542' FEET DRILLED, 94.3 APIG DRILL; 13 1/2" HOLE; F/ 5,662'MD 3,325' TVD.- T/ 6,223'MD 3,513' TVD. UP WT:200K, DN WT:115K, ROT WT: 150K BIT: 3.71-ADT, 0-AST, 3:71-ART, 41.18-TOTAL BIT HOURS,. 20-30 WOB, 900-GPM, 3,800- ON BTM PRESS, 3,720-OFF BTM PRESS, 80-100 RPM, 19-18k TORQ ON BTM, 10-15k TORQ OFF BTM, 124 MAX GAS UNITS, 69 BACKGROUND GAS UNITS. 9.6 MW, 180 VIS,48 YP, 101 deg FLOW LINE TEMP. 561' FEET DRILLED,151' AVERAGE ROP. TOTAL; 63.85HRS, 6103' FEET DRILLED, 95.5 APIG CIRCULATE; 500 BBLS PULL ONE STAND CIRCULATE A TOTAL 1 1/2 BTMS UP. Trip Out Hole; PUMP OUT HOLE F! 6,150' - 815' UP WT.-150K, DN WT.-110K 400-GPM, 1,190PSI. FLOW CHECK WELL 10MIN AT 4,777' NOTE; #1 PUMP DOWN, (LINER AND SWAB) PUMP OUT HOLE WITH ONE PUMP, PUMP RATES TO EQUAL PULL SPEEDS. LIMITED T/50-60' PER MIN. TRIP OUT HOLE; PULL BHA, LAY DOWN UBHO,BIT CLEAR AND CLEAN RIG FLOOR. MAKE UP BIT #2, CHANGE BEND IN MOTOR FROM 1.5 TO 1.15 DEG,UD PRESS DROP SUB, DOWN LOAD MWD,CHANGE JET IN MWD FROM 8 TO 12, ORIENTATE TRIP IN HOLE WITH BHA. TRIP IN HOLE; T/ 1,041' MAKE UP GHOST REAMER, CONT. TRIP IN HOLE T/ 2,821' RIG SERVICE, FILL PIPE @ 2,821' TRIP IN HOLE; F/ 2,821' - T/ 6151' FILL PIPE EVERY 25 STANDS CIRCULATE; WASH T/ 6,223' CIRCULATE BTMS UP. 120 UNITS OF GAS WHILE CIRCULATING BTMS UP. DRILL; 13 1/2" HOLE; F/ 6,223'MD 3,513' TVD. T/ 6,530' MD 3,619' TVD. UP WT:195K, DN WT:115K, ROT WT:150K BIT: 2.70-ADT, .52 AST, 2.18-ART,2.70-TOTAL BIT HOURS, 20-30 WOB, 850-GPM, 3,420- ON BTM PRESS, 3,300-OFF BTM PRESS, 100-120 RPM, 10-18k TORQ ON BTM, 10-12k TORQ OFF BTM, 225 MAX GAS UNITS, 60-100 BACKGROUND GAS UNITS. 9.8 MW, 180 VIS,52 YP, 82 deg FLOW LINE TEMP. 307' FEET DRILLED,113'AVERAGE ROP. TOTAL; 67.6 HRS, 6,410' FEET DRILLED, 94.82 APIG Note: Bringing Mud wieght up T/10ppg rrintea: -i uawtwo a:av:us rim • • ConocoPhillips Alaska Page 6 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours Code Code Phase 9/22/2005 106:00 - 12:00 6.00 DRILL I DRLG SURFAC 12:00 - 18:00 6.001 DRILL DRLG SURFAC 18:00 - 19:30 1.501 DRILL ~ DRLG SURFAC 19:30 - 21:15 I 1.751 RIGMNTI RGRP I SURFAC 21:15 - 00:00 9/23/2005 00:00 - 06:00 2.751 DRILL ~ DRLG SURFAC 6.001 DRILL i DRLG I SURFAC Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations DRILL; 13 1/2" HOLE; F/ 6,223'MD 3,513' ND. T/ 6,981' MD 3,700' TVD. UP WT:210K, DN WT:115K, ROT WT:150K BIT: 3.18 ADT, .99-AST, 2.19-ART, 6.53-TOTAL BIT HOURS, 20-30 WOB, 850-GPM, 3,420- ON BTM PRESS, 3,300-OFF BTM PRESS, 100-120 RPM, 10-18k TORO ON BTM, 10-12k TORO OFF BTM, 225 MAX GAS UNITS, 160-100 BACKGROUND GAS UNITS. 10 MW, 160 VIS,37 YP, 92 deg FLOW LINE TEMP. 451' FEET DRILLED,141' AVERAGE ROP. TOTAL; 73.6 HRS, 6,861' FEET DRILLED, 93.2 APIG DRILL; 13 1/2" HOLE; F/ 6,981'MD 3,700' TVD. T/ 7,347' MD 3,889' TVD. UP WT:215K; DN WT:115K, ROT WT:152K 4.53 ADT, .42-AST, 4.11-ART, 11.06-TOTAL BIT HOURS, 20-40 WOB, 900-GPM, 3,850 - ON BTM PRESS, 3,750-OFF BTM PRESS, 120 RPM, 10-19k TORQ ON BTM, 10-12k TORO OFF BTM, 225 MAX GAS UNITS, 120 BACKGROUND GAS UNITS. 10 MW, 170 VIS,45 YP, 95 deg FLOW LINE TEMP. 366' FEET DRILLED,80.79' AVERAGE ROP. TOTAL; 79.6 HRS, 7,227' FEET DRILLED, 90.79 APIG DRILL; 13 1/2" HOLE; F! 7,34TMD 3,889' TVD. T/ 7,432' MD 3,919' TVD. UP WT:215K, DN WT:115K, ROT WT:152K 1.13 ADT, 0.0-AST, 1.13-ART, 12.19-TOTAL BIT HOURS, 20-40 ~ 900-GPM, 3,850 - ON BTM PRESS, 3,750-OFF BTM PRESS, 120 RPM, 10-19k TORQ ON BTM, 10-12k TORO OFF BTM, 269 MAX GAS UNITS, 100 BACKGROUND GAS UNITS. 10 MW, 180 VIS,52 YP, 95 deg FLOW LINE TEMP. 85' FEET DRILLED,75.22' AVERAGE ROP. TOTAL; 81.3 HRS, 7,312' FEET DRILLED, 89.93 APIG #2 Pump Down Circulate and Recipacate with 1 pump @ 400 GPM 1,400psi. DRILL; 13 1/2" HOLE; F/ 7,432'MD 3,919' TVD. T/ 7,598' MD 3,970' TVD. UP WT:215K, DN WT:115K, ROT WT:152K 3.09 ADT, .51 AST, 2.58-ART, 14.15-TOTAL BIT HOURS, 20-40 WOB, 900-GPM,3,900 - ON BTM PRESS, 3,800- OFF BTM PRESS, 800-GPM, 3,300 - ON BTM PRESS, 3,150-OFF BTM PRESS, 120 RPM, 10-19k TORQ ON BTM, 10-12k TORQ OFF BTM, 225 MAX GAS UNITS, 120 BACKGROUND GAS UNITS. 10 MW, 175 VIS,546 YP,100 deg FLOW LINE TEMP. 166' FEET DRILLED,75.22' AVERAGE ROP. TOTAL; 84.1 HRS, 7,478' FEET DRILLED, 88.91 APIG DRILL; 13 1/2" HOLE; F/ 7,598'MD 3,970' TVD. T/ 8,050' MD 4,116' TVD. UP WT:230K, DN WT:120K, ROT WT:160K 4.51 ADT, .56-AST, 3.95-ART, 18.66-TOTAL BIT HOURS, 20-40 WOB, 900-GPM,3,900 - ON BTM PRESS, 3,800- OFF BTM PRESS, rnnteo: iusurtuw aa4:usHm • ConocoPhillips Alaska Page 7 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours Code Code'. Phase 19/23/2005 ~ 00:00 - 06:00 ~ 6.00 ~ DRILL DRLG SURFAC 06:00 - 12:00 6.00 I DRILL DRLG SURFAC 12:00 - 16:00 I 4.00 I DRILL I DRLG I SURFAC 16:00 - 18:00 I 2.001 DRILL I TRIP I SURFAC 18:00 - 19:00 1.00 DRILL SFTY SURFAC 19:00 - 19:15 0.25 DRILL SFTY SURFAC 19:15 - 20:00 0.75 DRILL TRIP SURFAC 20:00 - 00:00 4.00 DRILL DRLG SURFAC Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations 800-GPM, 3,300 - ON BTM PRESS, 3,150-OFF BTM PRESS, 120 RPM, 12-22k TORO ON BTM, 15-18k TORQ OFF BTM, 255 MAX GAS UNITS, 90 BACKGROUND GAS UNITS. 10 MW, 160 VIS,45 YP,110 deg FLOW LINE TEMP. 452' FEET DRILLED,100.22' AVERAGE ROP. TOTAL;90.1 HRS, 7,930' FEET DRILLED, 88.01' APIG MW= 10 ppg, vis=175, YP=46, FLT=100-105 deg. DRILL; 13 1/2" HOLE; F/ 8,050'MD4,116' TVD. T/ 8,376' MD4,222' TVD. UP WT:235K, DN WT:115K, ROT WT:160K 4.77 ADT,.36-AST, 3.95-ART, 23.43-TOTAL BIT HOURS, 20-40 WOB, 900-GPM,3,800 - ON BTM PRESS, 3,600- OFF BTM PRESS, 800-GPM, 3,300 - ON BTM PRESS, 3,150-OFF BTM PRESS, 120 RPM, 12-22k TORO ON BTM; 10-15k TORO OFF BTM, - 255 MAX GAS UNITS, 90 BACKGROUND GAS UNITS. 10 MW, 160 VIS,45 YP,110 deg FLOW LINE TEMP. 326' FEET DRILLED,68.34' AVERAGE ROP. TOTAL;96.1 HRS, 8,256' FEET DRILLED, 87.15' APIG. MW=10 ppg, vis=155, YP=46, FLT=115 deg DRILL; 13 1/2" HOLE; F/ 8,376'MD 4,222' TVD. T/ 8,466' MD 4,253' TVD. UP WT:235K, DN WT:115K, ROT WT:160K 2.84 ADT,.19-AST, 2.65-ART, 26.27-TOTAL BIT HOURS, 20-40 WOB, 900-GPM,3,950 - ON BTM PRESS, 3,700- OFF BTM PRESS, 800-GPM, 3,400 - ON BTM PRESS, 3,300-OFF BTM PRESS, 120 RPM, 12-22k TORO ON BTM, 10-15k TORO OFF BTM, 255 MAX GAS UNITS, 90 BACKGROUND GAS UNITS. 10 MW, 160 VIS,45 YP,110 deg FLOW LINE TEMP. 90' FEET DRILLED,31.69' AVERAGE ROP. TOTAL;100.1 HRS, 8,346' FEET DRILLED, 83.38' APIG. MW= 10 ppg, vis=160, YP=45, FLT=110 deg Short Trip: Pump Out Hole F/ 8,466' - T/ 7,290' Pump @ 400gpm #1 Pump. Had T/ Change Out 2 Swabs in # 2 Pump. Circulate Hole: ConocoPhillips Safety Shut Down. PJSM Trip In Hole To 8,466' DRILL; 13 1/2" HOLE; F/ 8,466'MD 4,253' TVD. T/ 8,552' MD 4,282' TVD. UP WT:235K, DN WT:115K, ROT WT:160K 2.84 ADT,.19-AST, 2.65-ART, 26.27-TOTAL BIT HOURS, 20-50 WOB, 900-GPM,3,880 - ON BTM PRESS, 3,700- OFF BTM PRESS, 800-GPM, 3,400 - ON BTM PRESS, 3,300-OFF BTM PRESS, 120 RPM, 12-22k TORO ON BTM, 10-15k TORO OFF BTM, 255 MAX GAS UNITS, 90 BACKGROUND GAS UNITS. 10 MW, 160 VIS,45 YP,110 deg FLOW LINE TEMP. 90' FEET DRILLED,31.69' AVERAGE ROP. TOTAL;104.1 HRS, 8,432' FEET DRILLED, 80.99' APIG. MW=10 ppg, vis=160, YP=49, FLT=110 deg 9/24/2005 00:00 - 00:30 0.50 DRILL TRIP SURFAC Trip Out Hole; Pump Out Hole F/ 8,552' - T/ 8,015 00:30 - 01:30 1.00 RIGMNT OTHR SURFAC Circulate and Reciprocate; While Crew were Cleaning Up Rig floor. Driller was Pumping Out of hole and left pumps engaged, Roughnecks ~ broke connection Installed Mud Bucket and Driller started backing out rnncea: iuowcuvo a.,W.~o wn • • ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Event Name: ROT-.DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours Code Code Phase 9/24/2005 100:30 - 01:30 I 1.00 ~ RIGMNT OTHR SURFAC 01:30 - 11:30 I 10.00 DRILL TRIP SURFAC 11:30 - 13:30 2.00 DRILL TRIP SURFAC 13:30 - 15:00 1.50 DRILL SFTY SURFAC 15:00 - 17:00 2.00 DRILL TRIP SURFAC 17:00 - 20:45 3.75 DRILL TRIP SURFAC 20:45 - 22:45 22;45 - 00:00 1.251 DRILL DRLG 1 SURFAC 19/25/2005 100:00 - 06:00 06:00 - 11:00 11:00 - 16:30 16:30 - 16:45 16:45 - 18:45 18:45 - 19:00 6.00 I DRILL I DRLG I SURFAC 5.00 DRILL DRLG SURFAC 5.501 DRILL ICIRC (SURFAC 0.25 DRILL ~ OBSV SURFAC 2.00 DRILL TRIP SURFAC 0.25 RIGMNT RGRP SURFAC Page 8 of 44 Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations with top drive. When connection was backed out enough the pressure lifted the stand and mud bucket up mud was, released. Approximately 3.4 bbls. all in Rig Containment as a result of release #1 pump broke right hand side drive chain on mud pump. Reported To Security 01:13am, approximately 6 bbls was released. After further investagation total fluid discharge was 3.4 bbls. Trip Out Hole; F/ 8,015' - 815' Pumping Out of Hole with #2 Pump, 450 GPM - 1,100psi. Pull Rates to equal Pump Rates. Monitor Wetl;Work BHA UD Bit, Motor, Clear and Clean Rig Floor, Pick Up BHA #3 New Motor,Bit, Run in Hole With BHA. .Trip in Hole install Ghost Reamer 1,041' Shallow Test MWD, Trip in Hole, Fill Pipe every 25 stands. 7,423' Wash and Ream F/7,423'-T/ 8,552' DRILL; 13 1/2" HOLE; F/ 8,552'MD 4,282' TVD. T/ 8,61T MD 4,304' TVD. UP WT:230K, DN WT:120K, ROT WT:160K 1.25 ADT,.O-AST, 1.25-ART, 1.25-TOTAL BIT HOURS, 10k WOB first 30', 25 WOB 700-GPM,3,250 - ON BTM PRESS, 3,100- OFF BTM PRESS, 800-GPM, 3,680 - ON BTM PRESS, 3,420-OFF BTM PRESS, 100 RPM, 12-22k TORQ ON BTM, 10-15k TORQ OFF BTM, 120 RPM, 12-22k TORQ ON BTM, 10-15k TORQ OFF BTM, 255 MAX GAS UNITS, 90 BACKGROUND GAS UNITS. 10 MW, 185VIS,60YP,80 deg FLOW LINE TEMP. 65' FEET DRILLED,52.0' AVERAGE ROP. TOTAL;105.35 HRS, 8,497' FEET DRILLED, 80.65' APIG. DRILL; 13 1/2" HOLE; F/ 8,617'MD 4,304' TVD. T/ 9,002' MD 4,434' TVD. UP WT:250K, DN WT:120K, ROT WT:165K 4.59 ADT,1.35-AST, 2.99-ART, 5.59-TOTAL BIT HOURS, 20- 25 WOB 820-GPM,4,000 - ON BTM PRESS, 3,880-OFF BTM PRESS, 120 RPM, 12-23k TORQ ON BTM, 12-15k TORQ OFF BTM, 16 MAX GAS UNITS, 10 BACKGROUND GAS UNITS. 10 MW, 185VIS,60YP,80 deg FLOW LINE TEMP. 385' FEET DRILLED,83.88' AVERAGE ROP. TOTAL;111.35 HRS, 8,497' FEET DRILLED, 80.65' APIG. DRILL; 13 1/2" HOLE; F/ 9,002'MD 4,434' TVD. T/9,237' MD 4,518' TVD. TD. UP WT:245K, DN WT:120K, ROT WT:160K 4.00 ADT,1.2-AST, 2.8-ART, 9.59-TOTAL BIT HOURS, 20- 25 WOB 800-GPM, 3,850 ON BTM PRESS, 3,650-OFF BTM PRESS, 120 RPM, 10-22k TORQ ON BTM, 10-15k TORQ OFF BTM, 255 MAX GAS UNITS, 100 BACKGROUND GAS UNITS. 10 MW, 185 VIS, 60 YP, 80 deg FLOW LINE TEMP. 235' FEET DRILLED,58.75' AVERAGE ROP. TOTAL;116.35 HRS, 9,117' FEET DRILLED, 78.36' APIG. CIRCULATE AND CONDITION: 750 GPM @ 3,200PSI. RECIPROCATE AND ROTATE. 3x BTMS UP PULL 1 STAND EVERY 7,000STRKS. TOTAL STROKES 45,000. MONITIOR WELL PUMP OUT HOLE F/ 8,624' - 7,315', SLM OUT OF HOLE. EQUIPMENT FAILURE; WHILE PUMPING OUT HOLE STAND PIPE Printed: 17J3Uf10D~ y:34:V3 AM • ConocoPhillips Alaska Page 9 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours Code Phase Description of Operations Code 9/25/2005 18:45 - 19:00 0.25 RIGMNT RGRP SURFAC "Y" SPLIT SPRAYING 22 GALS MUD ONTO RIG FLOOR. STOP PUMPING CLOSE IN AND CLEAN AREA. WHILE WORKING PIPE. 19:00 - 21:30 2.50 RIGMNT RGRP SURFAC TRIP OUT HOLE; 7,315' - 4,410' MONITIORING ON TRIP TANK. RIG UP 2" HIGH PRESS LINE TO BYPASS "Y" ON STAND PIPE. 21:30 - 21:45 0.25 RIGMNT RGRP SURFAC STOP MONITIOR WELL WHILE TESTING 2" BYPASS LINE 4,000PSI. PUMP SLUG. 21:45 - 00:00 2.25 RIGMNT RGRP SURFAC TRIP OUT HOLE F/ 4,410' - 1600' 9/26/2005 00:00 - 00:45 0.75 DRILL DRLG SURFAC Trip Out Hole F/ 1600'- T/ 815' Lay Down Ghost Reamer 1/8" UNDER GAUGE, 00:45 - 01:00 0.25 DRILL OBSV SURFAC Monitior Well 01:00 - 04:00 3.00 DRILL TRIP SURFAC BHA; STAND BACK 6 STAND 5" HWT DRILL PIPE, UD Z-5" HWDP AND JARS. 3-FLEX DRILL COLLARS, MWD ,MOTOR AND BIT. 04:00 - 04:30 0.50 DRILL SURFAC Clean Rig Floor and Lay down tools. 04:30 - 05:30 1.00 CASE RURD SURFAC Pick Up Tam-Port Shifting Tool, Make upon single and Lay Down-in Pipe Shed. Make Dummy-run with hanger and landing joint. 05:30 - 09:00 3.50 CASE RURD SURFAC Rig Up To Run 10 3/4" casing. Had to Replace 4" valve on Conductor. 09:00 - 09:30 0.50 CASE SFTY SURFAC Held PJSM on running casing with crews. 09:30 - 10:00 0.50 CASE RUNC SURFAC Make up 10 3/4" Shoe and Float collar and confirm Float equipment is functional 10:00 - 12:00 2.00 CASE RUNC SURFAC Run 10 3/4" 45.5 # 1-80 BTC casing, as per-running oroer i i~ ttua 13:00 - 14:00 1.00 CASE CIRC SURFAC Break circulation and circulate bottoms up wi#h 400 GPM and 300 PSI / Up wt= 205K / Dn wt= 90K 14:00 - 16:30 2.50 CASE RUNC SURFAC Run 10 3/4" 45.5 # I-80 BTC casing, as per-running order Tl3768' 16:30 - 17:00 0.50 CASE CIRC SURFAC Break circulation with 400 GPM and 420 PSI / Up wt= 230K / Dn wt= 90K 17:00 - 18:00 1.00 CASE RUNC SURFAC Run 10 3/4" 45.5 # I-80 BTC casing, as per-running order T/4573' 18:00 - 19:30 1.50 CASE CIRC SURFAC Break circulation and circulate bottoms up with 400 GPM and 519 PSI / Up wt= 270K / Dn wt= 90K 19:30 - 22:00 2.50 CASE RUNC SURFAC Run 10 3/4" 45.5 # I-80 BTC casing, as per-running order T/6848' 22:00 - 22:30 0.50 CASE CIRC SURFAC Break cirulation and circulate 1500 strokes @ 400 GPM and 575 psi / Up wt=300K / Dn wt= 90K 22:30 - 00:00 1.50 CASE RUNC SURFAC Run 10 3/4" 45.5 # I-80 BTC casing, as per-running order T/ 7,751' 9/27/2005 00:00 - 00:45 0.75 CASE RUNC SURFAC Run 10 3/4" 45.5 # L-80 BTC casing, as per-running order f/ 7751' to 8,303' Install Tam-Port Collar @ 8,219' 00:45 - 01:30 0.75 CASE CIRC SURFAC Break cirulation @ 8303'- and circulate 1500 strokes @ 400 GPM and 575 psi / Up wt=360K / Dn wt= 90K 01:30 - 02:45 1.25 CASE RUNC SURFAC Run 10 3/4" 45.5 # L-80 BTC casing, as per-running order f/ 8303' to 9,170' (232 jts total) 02:45 - 03:15 0.50 CASE CIRC SURFAC Break cirulation and circulate 1500 strokes @ 500 GPM and 700 psi / Up wt=400K / Dn wt= 110K 03:15 - 04:15 1.00 CASE RUNC SURFAC UD Fill Up Tool, Blow Down Top Drive, P/U Landing Jt Hanger, Check Break on 10' Pup, Land Hanger, Rig Up Cement Head, 04:15 - 06:00 1.75 CEMEN CIRC SURFAC Circulate and Condition mud for cement Job. 10 3/4" shoe @ 9221'. Staging Up 3bbls-370psi. 4 bbls 460psi. 6bpm @ 340 @ 4200 strokes Up Wt. 410k Dn Wt. 110k Note; Took 560k Break Over. 06:00 - 08:00 2.00 CEMENTCIRC SURFAC Continue to circ and condition mud and hole f/ cement. Circ @ 6bpm w/ 340 psi. Recip pipe 30'. PU wt 410k, SO wt 110k, blocks 70k. Casing started to get sticky (PU wt 550k, no down wt)(had circulated 1000 bbls.) Worked pipe free and landed 10 3/4" casing @ 0730 hrs. Continue to circ @ 6bpm w! 340 psi. Casing depth 9221.75'. rnncea: maurzuw a:~n:us Hm • ConocoPhillips Alaska Page 10 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1 C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours Code Code Phase 9/27/2005 ~ 08:00 - 12:00 ~ 4.00 ~ CEMENTPUMP (SURFAC 12:00 - 12:15 0.251 CEMENl(DISP SURFAC 12:15 - 13:45 I 1.501 CEMENl~ DISP ~ SURFAC 13:45 - 15:20 ~ 1.58 I CEMENl(DISP ~ SURFAC 15:20 - 19:45 4.421 CEMENl~OTHR SURFAC 19:45 - 20:30 I 0.751 CEMEN7~ OTHR I SURFAC 20:30 - 21:30 1.00 CEMEN OTHR SURFAC 21:30 - 21:45 0.25 CEMEN OTHR SURFAC 21:45 - 23:45 2.00 CEMEN PULD SURFAC 23:45 - 00:00 0.25 WELCT NUND SURFAC 9!28/2005 00:00 - 03:00 3.00 WELCT NUND SURFAC 03:00 - 04:30. 1.50 WELCT NUND SURFAC 04:30 - 06:00 1.50 CEMEN OTHR SURFAC 06:00 - 12;00 6.00 CEMEN OTHR SURFAC 12:00 - 12:30 0.50 CEMEN~CIRC SURFAC 12:30 - 13:00 0.50 CEMEN SFTY SURFAC 13:00 - 13:30 I 0.501 CEMENIC PUMP I SURFAC 13:30-14:00. 0.50 CEMEN7PULD SURFAC 14:00 - 16:00 2.00 WELCTI~ NUND SURFAC 16:00 - 17:30 ~ 1.50 j WELCTLj NUND ~ SURFAC Description of Operations Shut down rig pump, line up on Dowell/Schlumberger @ 0800 hrs. Pump 10 bbls water @ 4bpm 110 psi. Pressure test lines to 3500 psi @ 0810 hrs. Dowell mix and pump 50 bbls CW 100 @ 5.1 bpm w/ 385 psi @ 0822 hrs. Drop bottom plug @ 0832 hrs. Pump 50 bbls mud push w! red dye 10.5ppg @ 3.5 bpm w/ 330 psi @ 0837 hrs. Pump AS lite lead (10.7ppg)(859.1 bbls) @ 6bpm w/ 460 psi @ 0850 hrs, follow w/ tail (12.0 ppg) (229.5 bbls) @ 5.3 bpm w/ 150 psi @ 1112 hrs. Drop top plug @ 1211 hrs. Pump 20 bbls water @ 5bpm w/ 350 psi @ 1212 hrs. Rig displace @ 60 spm w/ 350 psi. At 4800 strokes divert returns to cellar box. Continue displacing w/ rig pumps @ 60 spm. At 5000 strokes pumped had good cement returns to surface. At 6000 strokes, lost returns, - slowed- rate to 35 spm wf 1480-psi. At 6200 strokes lost returns when increased rate to 50 spm. At 7000 total strokes 1970 psi. At 8545 total strokes pumped, bumped plugs @ 1516 hrs. Pressure to 1900 psi, bleed off to check floats, not holding. Pressure back up fio 1500 psi and hold pressure. Wait on cment f/ 4 hrs @ 1520 hrs CIP. WOC w/ 1448 psi applied pressure. Clean up rig f/ cement job. Ready diverter f/ nipple down. SICP 1448 psi. Bleed off pressure, 1 bbl bleed back, continuing to bleed back @ rate of 1/2 bph. Shut in casing. Continue wait on cement. Monitor pressure, none. Open valve @ cement head, monitor returns in 5 gallon bucket. Returns of 1/2 gallon total, then stopped. Blow down cement line. N/D cement head, lay down landing joint (left hand threads), clear floor of casing tools. N!D diverter riser. Flush riser and annular f/ cement contamination. N/D flowline, 8' of flowline was 3/4 full of cement. UD riser and remove f/ cellar. Flush annular, work bag to remove cement f/ annular. N/D annular and diverter spool. MU 3 jts of 1" cs hydril 2.25 ppf L-80 (1.315" OD w/ 1.6" connection OD) to run along side of 10-3/4".FMC hanger and landing ring on 16" conductor. Try to fit, will not fit between the space of the Hutted hanger and landing ring. Run 20' of 1/2" cold roll down along side of Outs to depth of 17'. Lay down the hydril CS 1"tubing. MU 3/4" x 10' conduit threaded, attempt several times, to go past collar below hanger, no go. Lay down 3/4" pipe. Had warehouse to deliver 3/4" x 20' sticks of pipe. Weld pipe together and washed down to depth of 30' below hanger (70 1/2' RKB). Flush annulus between 16" conductor and 10-3/4" surface casing to 30' below hanger w/ water. Hold PJSM w/ Dowell cementers and rig crew prior to top job cementing of annulus of 16" & 10-3/4" surface casing. Dowell pump .5 bbls water, pump 4.8 bbls of AS lite cement @ 10.7-10.8 ppg @ 1 bpm w/ 60 psi. Rig down Dowell cementers. Rig down 3/4" pipe used f! top job. Install FMC Gen 5 casing and tubing head. Orient according to Valve and handwheel orientation drawing SK-1C20/28. Dated 07/2005 Install double studded adapter 11" 5M x 13-5/8" 5m, install riser, install spacer spool. PU BOP stack and set weight on FMC wellhead. Test metal to metal seal to 1000 psi, OK. hold f/ 10min. Nrmtea: iusur~wo asv:usHm • ConocoPhillips Alaska Page 11 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours Code Sub ' Phase Description of Operations I' Code 9/28/2005 ~ 16:00 - 17:30 ~ 1.50 ~ WELCT NUND SURFAC Note: Rig floor to casing spool LD screws 38.70'. Rig floor to tbg head 17:30 - 00:00 6.50 9/29/2005 00:00 - 01:30 1.50 01:30 - 04:30 3.00 04:30 - 06:00 1.50 06:00 - 12:00 I 6:00 LD screws 36.50'. NUND SURFAC Continue NU 13 5/8" ROPE. Nipple up choke line, kill line, flow nipple, connect turnbuckles. Hammer up flanges. OTHR SURFAC Rig up floor. Change bales to drilling bales. PU 4" floor valves, x-o's, test plug and wear bushing. OTHR SURFAC RU to test. MU 4" test joint and x-o's. Lay down test joint. MU 5" test joint and head pin. MU test plug, RIH, RU test hoses. fill stack and choke manifold w/ water. BOPE SURFAC Test BOPE, witness of test by AOGCC inspector Lou Grimaldi. Test annular to 250 psi low and 3500 psi high w/ 5" dp. Test upper rams (4-1/2" x 7" variables), outer kill HCR valve and inner manual valve on choke side to 250 psi low and 4200 psi high. Note: 4200 psi is 80% burst of 10 3/4" casing. BOPE SURFAC Continue testing 13 5/8" 5m BOPE. Test 250 psi low and 4200 psi-high '~ all componets except hydril, high test on hydril 3500 psi. Testing 'i against upper pipe rams, manual kil valve; HCR choke valve, choke manifold valves 16,17, 18, and 5" dart valve. Test choke manifold valves 12,13,14,15, and TIV1/ valve. Test choke manifold valves 5,6,10, ', 8~ 11 w/ 4" dart valve. Test choke manifold valves 1,4,7 & 4" TIW valve. Test choke valves 2,3,8, 8~ 9, Test lower pipe rams (3-1/2" x 6" variables) w/ 4" DP. 12:00 - 14:00 ~ 2.00 ~ RIGMNT~ RGRP SURFAC Work on Koomy unit. Checked pre charge, charged 2 bottles f! 925 psr to 1000 psi, change manifold pressure guage, adjust air pump pressure sensor f/ cut in & out pressure. 14:00 - 16:00 2.00 WELCT BOPE SURFAC Test Hydril 250 psi low, 3500 psi high w/ 4"joint of pipe 16:00 - 1630 0.50 WELCT BOPE SURFAC Test blind rams to 250 psi low and 4200 psi high. 16:30 - 17:00 0.50 WELCT BOPE SURFAC Test upper IBOP valve on top drive drive to 250 psi low and 4200 psi high. 17:00 - 17:30 0.50 WELCT BOPE SURFAC Test lower IBOP valve on top drive to 250 psi low and 4200 psi high. 17:30 - 18:00 0.50 WELCT OTHR SURFAC Rig down testing tools and equipment. 18:00 - 19:30 1.50 WELCT OTHR SURFAC Set FMC long slotted wear bushing. 10" ID, 10-7/8" OD. R/D test joint. 19:30 - 21:00 1.50 RIGMNT RSRV SURFAC Slip and cut 154' drilling line: 21:00 - 22:30 1.50 RIGMNT RSRV SURFAC Service top drive. Grease crown and drawworks. 22:30 - 22:45 0.25 DRILL SFTY SURFAC Pre job safety meeting on PU/MU BHA #4 (9-7/8") 22:45 - 00:00 1.25 DRILL PULD SURFAC PU Geo pilot, MU 9.18' geo flex, MU bit. Note: Held H2s drill w! personal accounted for in truck shop. 9/30/2005 00:00 - 00:15 0.25 DRILL PULD SURFAC Continue PU BHA # 4 (9-7/8" geo pilot). PU/MU smart stabilizer, MWD, TM HOC. 00:15 - 01:00 0.75 DRILL OTHR SURFAC Upload Sperry Sun MWD tools. 01:00 - 01:30 0.50 DRILL PULD SURFAC PU/MU/RIH w/ Sperry Sun 6 3/4" flex collars. 01:30 - 03:30 2.00 DRILL PULD SURFAC Change elevators. PU/MU/RIH w/ Weatherford 4" XT-39 HWDP & rabbit w/ 2-3/8" rabbit. Torque to 22,200 ft/Ib. PU Weatherford Daily drilling jars and Weatherford Daily acceleratorjars. 03:30 - 04:30 1.00 DRILL OTHR SURFAC Test Sperry Sun geo pilot skid to 4000 psi. Shallow test MWD tools @ 626', ok. Blow down Tines. PU wt 90k, SO wt 90k. 04:30 - 06:00 1.50 DRILL PULD SURFAC PU/MU/RIH w/ Weatherford 4", HT38 dp, rabbit with 2-3/8" rabbit. Torque to 17,700 ftllb 06:00 - 06:15 O.Z5 DRILL OTHR SURFAC Rotate 20 rpm & pump 20 psi w/ 100 psi f/ 1002-1034'. Tam port collar @ 1002' 06:15 - 12:00 5.75 DRILL PULD SURFAC Continue PU/MU/RIH w/ Weatherford 4", HT38 dp, rabbit with 2-3/8" rabbit. Torque to 17,700 ft/Ib. PU total of 111 jts 4" HT38. Depth is 4140'. PU wt 130k, SO wt 100k Printed: 12/302005. 9:34:03 AM • ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1C-28 Page 12 of 44 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours Code Code Phase 9/30/2005 ~ 12:00 - 16:00 ~ 4.00 ~ DRILL ~ PULD SURFAC 16:00 - 17:00 1.00 DRILL OTHR SURFAC 17:00 - 18:00 1.00 DRILL TRIP SURFAC 18:00 - 19:00 1.00 ~ DRILL REAM ~ SURFAC 19:00 - 20:45 1.75 DRILL CIRC SURFAC 20:45 - 21:30 0.75 CASE DEQT SURFAC 21:30 - 23:00 1.50 CASE DEQT SURFAC 10/1/2005 ~ 00:00 - 02:00 1.00 I DRILL ~ DRLG SURFAC 02:00 - 02:30 0.50 DRILL CIRC SURFAC 02:30 - 02:45 0.25 DRILL DRLG SURFAC 02:45 - 03:45 1.00 DRILL CIRC SURFAC 03:45 - 04:45 0.50 DRILL DRLG SURFAC 04:15 - 05:45 1.501 DRILL CIRC {SURFAC 05:45 - 06:00 0.25 DRILL LOT SURFAC 06:00 - 06:30 D.50 DRILL LOT SURFAC 06:30 - 07:00 0.50 DRILL OTHR SURFAC 07:00 - 07:30 0.50 DRILL OTHR INTRM1 07:30 - 08:00 0.50 DRILL TRIP INTRM1 08:00 - 08:15 0.25 DRILL CIRC INTRM1 08:15 - 10:45 2.50 DRILL TRIP INTRM1 10:45 - 11:00 0.25 DRILL OTHR INTRM1 11:00 - 12:45 1.75 DRILL TRIP INTRM1 12:45 - 13:30 0.75 DRILL TRIP INTRM1 13:30 - 14:00 0.50 DRILL OTHR INTRM1 14:00 - 14:30 0.50 DRILL PULD INTRM1 14:30 - 15:45 1.25 DRILL PULD INTRM1 15:45 - 16:00 0.25 DRILL OTHR INTRMI 16:00 - 17:00 1.00 DRILL OTHR INTRM1 17:00 - 17:15 0.25 DRILL PULD INTRM1 17:15 - 18:00 0.75 DRILL TRIP INTRMI 18:00 - 19:15 1.25 DRILL TRIP INTRM1 19:15 - 22:30 3.25 DRILL TRIP INTRM1 22:30 - 00:00 10/2/2005 00:00 - 00:45 00:45 - 01:15 1.50 RIGMNT RSRV INTRM1 0.75 RIGMNT RSRV INTRM1 0.50 DRILL REAM INTRM1 01:15 - 06:00 4.75 ~ DRILL i DRLG ~ INTRM1 Description of Operations Change elevators, PU 90 joints Weatherford 5" 4/12" IF drill pipe & rabbit w/ 2 7/8" rabbit. Torque to 28,000 ft/Ibs. RIH f/ 4140' to 6994'. Fill drill pipe. Pulse test MWD. No pulse. Blow down top drive. Run 5" Dp from derrick, first stand is stand #68 on tally. Started taking weight @ 8802' (stand 86/87). MU top drive onto stand 86. Wash f/ 8202' to 9130'. Tag top of cement @ 9130'. Note:Top of float collar @ 9135.5'. Circ and condition mud prior to casing test. Stand back a stand. Blow down top drive. RU to test 10-3/4" casing. Flush air f/ mud lines/kill line. Test casing to 2500 psi f/ 30 min. Chart test. Rig down testing equipment. Drilling cement, wiper plugs f/ 9130' to 9132'. PU 260k, SO wt 105k, rot wt155k Drilling wiper plugs, @ 9132' , FC @ 97 35', green cement to 9217. PU 260k, SO wt 105k, rot wt 155k Circ out thick cement contaminated mud @ 9217'. Drill FS @ 9219', then cement in 13-1/2" OH (rat hole) to 9237'. .Circ out thick cement contaminated mud @ 9237'. Drill 9-7/8" hole f/ 9237' to 9257' (4524'TVD) ART = .5 hrs. WOB 20k, 120 RPM, 17-19 fUlb torque, 590 gpm w/ 3300 psi. Circ and condition mud f/ LOT @ 9257'. MW to 9.5 ppg. PU wt 260k, SO wt 105k, Rot wt 160k. Monitor well, PU into shoe. RU to perform LOT. Blow down top drive. RU/Perform LOT w/ 9.5 ppg MW csg shoe @ 9222' MD/4513' TVD, OH @ 9257' MD/ 4524' TVD. EMW 13.4 ppg using conservative 920 psi. R/D equipment f/ LOT. Move 5" HWDP f/ driller's side to OFF-Driller's die of derrick. POOH f/ Sperry Sun MWD (no pulse), Pull 10 stands 5" dp f/ 9200' to 8231'., monitor hole fill, monitor well @ 8231'. Pump dry job @ 8231'. POOH 5" DP f/ 8231' to 4172' Change elevators f/ 5" to 4" Continue POOH 4" DP and BHA f/ 4172' to 625'. Stand back HWDP and flex collars. Download MWD. L/D RLL, smart stab, Gamma/Res/ PWD. PU/MU BHA. New RLL, smart stab, GAM/RES/PWD. Upload MWD. Shallow pulse test. Check geopilot. RIH w/ BHA # 5 (9-7/8" w/ geopilot), UD top 5" HWDP joint above accelerators. Continue RIH w/ 4" dp f/ 412' to 1583'. Continue RIH w/ 4" dp f/ 1583' to 4140'. Fill pipe @ 2973'. Change elevators f/ 4" to 5". MU crossover, RIH f/ 2973' to 9154'. Fill pipe @ 4397, 6775' and 9154'. Service top drive. Change out saver sub. Service top drive. Change out saver sub. MU stand, MU top drive, fill pipe, Wash f/ 9154' to 9257'. Pump 600 gpm w/ 3450 psi. 120 rpm, 17-19k ft/Ib torque. Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 9257' to 9308' (4542' TVD) (51') ART 2.53 hrs w/ Sperry Sun geo pilot, 25k WOB, 120-150 rpm's, 600-640 gpm, 9.5 ppg mw, on bottom pressure 3300 rnn[eu. iuo~icuvo aav.w nm • ConocoPhillips Alaska Page 13 of 44 Operations Summary Report Legal Weil Name: 1C-28 (Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: ,Rig Name: Doyon 15 Rig Number: 15 Date ~ 10/2!2005 From - To Hours Code Sub Code 01:15 - 06:00 I 4.751 DRILL I DRLG 06:00 - 07:15 07:15 - 07:45 07:45 - 12:00 12:00 - 16:30 16:30 - 17:00 17:00 - 17:30 17:30 - 18:00 18:00 - 20:15 20:15 - 21:45 21:45 - 22:00 22:00 - 23:15 23:15 - 00:00 10/3/2005 00:00 - 01:30 01:30 - 02:30 02:30 - 03:15 03:15 - 03:30 03:30 - 04:45 04:45 - 06:00 06:00 - 09:30 09:30 - 10:00 Phase INTRM1 1,251 DRILL (DRLG IINTRM1 Description of Operations psi, off bottom pressure 3250 psi, on bottom torque 17k ft/Ib, off bottom torque 16k ft/Ib, PU wt 260k, SO wt 90k, Rot wt 160k. Note: Pumped 25 bbl pill- 20 ppb medium nut plug and .5 ppb SAPP @ 9295' to try to unball bit. Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 9308' to 9342' (4555' TVD) {34') ART 1.25 hrs w/ Sperry Sun geo pilot, 25k WOB, 140 rpm's, 640 gpm, 9.5 ppg mw, on bottom pressure 3500 psi, off bottom pressure 3400 psi, on bottom torque 17k fUlb, off bottom torque 16k ft/Ib, PU wt 245k, SO wt 100k, Rot wt 155k. 0.50 ~ DRILL ~ OTHR ~ INTRM1 ~ Perform PWD baseline test @ 9342' w/ 9.5 ppg mud: Clean hole @ 630 gpm/150 rpm is 10 ppg EMW. Clean hole @ 600 gpm/120 rpm is 10 PP9 EMW. 4.25 DRILL -DRLG INTRMI Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 9342' to 9520' (4615' TVD) (178') ART 3.72 hrs w/ Sperry Sun geo pilot, 25k WOB, 140 rpm's, 640 gpm, 9.5 ppg mw, on bottom pressure 3500 psi, off bottom pressure 3400 psi, on bottom torque 17k fUlb, off bottom torque 16k ft/Ib, PU wt 245k, SO wt 100k, Rot wt 155k. Note: Pumped 20 bbl pill- 19 ppb Med nut plug @ 9448'. 4.50 DRILL DRLG INTRM1 Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 9308' to 9520' (4652' TVD) (102') ART 2.13 hrs w/ Sperry Sun geo pilot, 25k WOB, 140 rpm's, 640 gpm, 9.5 ppg mw, on bottom pressure 3500 psi, off bottom pressure 3400 psi, on bottom torque 14-18k fUlb, off bottom torque 15k ft/Ib, PU wt 245k, SO wt 115k, Rot wt 160k. Note: Pump 20 bbl pil- 19 ppb medium nut plug @ 9553'. Note: Total hours on bit 9.63 hrs, total footage 365'. Average ROP equals 37.9 ft/hr. 0.50 DRILL OTHR INTRM1 Pump out of hole w/ 600 gpm & 3000 psi f/ 9622' to 9154'. 0.50 DRILL TRIP INTRM1 POOH f/ 9154' to 8583'. 0.50 DRILL CIRC INTRM1 Pump dry job. 25 bbls @ 11.3 ppg. Blow down.top drive. 2.25 DRILL TRIP INTRM1 Continue to POOH f/ 8583' to 4111'. Change slips and elevators to 4". 1.50 DRILL TRIP INTRM1 Continue to POOH f/ 4111' to 1050'. 0.25 DRILL TRIP INTRMI UD Ghost reamer. Check guage. Full guage 9-7/8". 1.25 DRILL TRIP INTRM1 Continue POOH w/ 4" dp f/ 1040' to MWD @ 62'. UD first 2 joints of HWDP in pipe shed. Stand back 4" HWDP, accelerators, jars and flex collars. 0.75 DRILL OTHR INTRM1 Download Sperry Sun MWD. 1.50 DRILL OTHR INTRM1 Download Sperry Sun MWD.PuII guts f/ HOC, UD MWD, UD geo pilot, Break bit, change jets in another bit. 1.00 DRILL PULD INTRMI PU/MU new Sperry Sun geoPilot, MU different 9-7/8" bit (steel body w/ (6) 18/32" jets)., change pulsar in HOC to handle higher flow rates up to 750 gpm. 0.75 DRILL OTHR INTRM1 Upload MWD. 0.25 DRILL DEOT INTRM1 MU top drive. Shallow test MWD. Good test. Blow down top drive. 1.25 DRILL TRIP INTRM1 MU flex collars, change elevators to 4", Trip in hole w/ 4" HWDP and jars and accelerators, MU 9 -7/8" ghost reamer on top of 4" HWDP to 609'. PU wt 93k, SO wt 92k, block wt 70k 1.25 DRILL TRIP INTRM1 Trip in hole w/ Weatherford 4" HT38 drill pipe f/ 609' to 2976', fill pipe. 3.50 DRILL TRIP INTRM1 Continue trip w/ Weatherford 4" DP in hole f/ 2976', change elevators and run 5" starting @ 4115'. Fill pipe @ 5351' and 9157'. Record up and down weights every 10 stands. 0.50 DRILL ; REAM INTRM1 MU top drive and ream f/ 9221' (csg shoe) to TD @ 9622'. Ream w/ 120 ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Start: 9/11/2005 Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours Code Phase Code 10/3/2005 09:30 - 10:00 0.50 DRILL REAM INTRM7 10:00 - 10:30 0.50 DRILL DRLG INTRM7 10:30 - 12:00 1.50 RIGMNT RGRP INTRMI 12:00 - 12:30 0.50 DRILL DRLG INTRM7 12:30 - 13:00 '13:00 --15:30 15:30 - 16:00 16:00 - 16:30 0.50 RIGMNT RGRP INTRM7 2.50 RIGMNT RGRP INTRM7 0.50 RIGMNT RGRP INTRM7 0.50 DRILL DRLG INTRM7 16:30 - 17:00 0.501 RIGMNTIRGRP I INTRMI 17:00 - 18:00 1.00 RIGMNT SFTY INTRM7 18:00 - 00:00 6.00 RIGMNT RGRP INTRM7 110/4/2005 100:00 - 06:00 6.001 RIGMNTIRGRP ~ INTRM7 06:00 - 09:30 09:45 - 10:00 10:00 - 10:45 10:45 - 12:00 3.501 RIGMNTIRGRP INTRMI 0.25 RIGMNT RGRP INTRM7 0.75 RIGMNT RGRP INTRM7 1.25 RIGMNT RGRP INTRMI 12:00 - 12:15 12:15 - 12:30 12:30 - 18:00 18:00 - 00:00 10/5/2005 00:00 - 01:30 0.25 DRILL TRIP INTRM7 0.25 DRILL REAM INTRM7 5.50 DRILL DRLG INTRM7 6,00 ~ DRILL ~ DRLG ~ INTRM7 1.501 DRILL i DRLG INTRM7 Page 14 of 44 Spud Date: 7/30/2005 End: Group: Description of Operations rpm, 650 gpm w/ 3950 psi. Torque 13-14k ft/ Ib. Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 9622' to 9643' (4659' TVD) (21') ART .27 hrs w/ Sperry Sun geo pilot, 20k WOB, 150. rpm's, 660 gpm, 9.5 ppg mw, on bottom pressure 3860 psi, off bottom pressure 3850 psi, on bottom torque 16k ft/Ib, off bottom torque 13k ft/Ib, PU wt 210k, SO wt 130k, Rot wt 158k. Change liner gasket on # 2 mud pump. Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 9643' to 9663' (4667' TVD) (20') ART .31 hrs w/ Sperry Sun geo pilot, 20k WOB, 150 rpm's, 660 gpm, 9.5 ppg mw, on bottom pressure 3860 psi, off bottom pressure 3850 psi, on bottom torque 16k ft/Ib, off bottom torque 13k ft/Ib, PU wt 210k, SO wt 130k, Rot wt 158k. POOH f/ 9663' to 9157' (inside casing shoe) to work on mud pumps. Changeiiner gaskets on # 1 and # 2 mud pump. - -- - -- RIH f/ 9157 to 9663'. Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 9663' to 9724' (4691' TVD) (61') ART .35 hrs w/ Sperry Sun geo pilot, 20k WOB, 150 rpm's, 660 gpm, 9.5 ppg mw, on bottom pressure 3860 psi, off bottom pressure 3850 psi, on bottom torque 16k ft/Ib, off bottom torque 13k ft/Ib, PU wt 210k, SO wt 130k, Rot wt 158k. Kelly hose hung up on 3" cement line @ gooseneck of 3" cement line, while going up to make a connection. POOH to 9143'. (10-3/4" Shoe @ 9222'). PJSM on rigging down kelly hose f/ derrick and top drive. Rig down kelly hose, lower hose to ground. Remove clamps and hammer unions in shop. Prepare ends f/ new kelly hose. New kelly hose manufactured by Copper State, 3-1/16" ID, 83' long. Prepare ends to attatch to new kelly hose. New kelly hose manufactured by Copper State, 3-1/16" ID, 83' long. Glean and scrub wind walls, circ top of hole. Hole static. MU new kelly hose to upper gooseneck of standpipe and then to top drive. Secure safety lines on both ends. Circ through mud line and fill kelly hose. Test hose to 5000 spi. Test hose to 5000 psi. Stage pressure up slowly. Run new hose up and down derrick, pressure hose to 3800-3900 spi, work up & down, downlink to see movement of hose in derrick. Inconclusive as to how old hose contacted 3" cementing line. Adjust safety clamp on top drive to hose. RIH f/ 9143' to 9631' Wash f! 9631' to 9724'. Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 9724' to 10092' (4824' TVD) (368') ART 3.65 hrs w/ Sperry Sun geo pilot, 10-20k WOB, 120-150 rpm's, 660-615 gpm, 9.5 ppg mw, on bottom pressure 3860-3750 psi, off bottom pressure 3850-3650 psi, on bottom torque 14-18k ft/Ib, off bottom torque 13k fUlb, PU wt 210-220k, SO wt 130k, Rot wt 158-162k. Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 10092' to 10413' (4941' TVD) (321') ART 3.65 hrs w/ Sperry Sun geo pilot, 10-20k WOB, 120-150 rpm's, 660-615 gpm, 9.5 ppg mw, on bottom pressure 3860-3750 psi, off bottom pressure 3850-3650 psi, on bottom torque 14-18k ftllb, off bottom torque 13k ft/Ib, PU wt 210-220k, SO wt 130k, Rot vut 158-162k. Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 1.0413' to 10537' rnrncu. iuouicwo a.oY.w ran • ConocoPhillips Alaska Page 15 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours Code Code Phase 10/5/2005 00:00 - 01:30 1.50 DRILL DRLG INTRM1 01:30 - 02:00 0.50 DRILL CIRC INTRM1 02:00 - 03:30 1.50 DRILL REAM INTRM1 03:30 - 04:15 0.75 DRILL TRIP INTRM1 04:15 - 04:30 0.25 DRILL OTHR INTRM1 04:30 - 06:00 1.50 DRILL CIRC INTRM1 06:00 - 06:45 0.75 DRILL CIRC INTRMI 06:45 - 11:00 4.25 DRILL TRIP INTRM1 1?:00 - 13:30 2.50 DRILL TRIP INTRM1 13:30 - 14:15 0.75 DRILL OTHR INTRMI 14:15 - 15:00 0.75 DRILL PULD INTRMI 15:00- 15:30 0.50 DRILL PULD INTRMI 15:30 - 17:00 1.50 DRILL PULD INTRM1 17:00 - 17:45 0.75 DRILL OTHR INTRM1 17:45 - 18:00 0.25 DRILL TRIP INTRM1 18:00 - 19:00 1.00 DRILL TRIP INTRM1 19:00 - 19:45 0.75 DRILL TRIP INTRM1 19:45 - 23:45 I 4.00 I DRILL I TRIP I INTRM1 23:45 - 00:00 0.25 DRILL OTHR INTRM1 10/6/2005 00:00 - 01:30 1.50 DRILL DRLG INTRMI 01:30 - 03:00 1.50 DRILL DRLG INTRMI 03:00 - 03:30 0.50 DRILL SFTY INTRMI 03:30 - 06:30 3.00 DRILL TRIP INTRM1 06:30 - 07:00 0.501 DRILL CIRC INTRM1 07:00 - 08:30 1.50 RIGMNT RSRV INTRM1 08:30 - 09:15 0.75 RIGMNT RSRV INTRM1 09:15 - 09:45 0.50 DRILL TRIP INTRM1 09;45 - 10:15 0.50 DRILL REAM INTRMI 10:15 - 12:00 ~ 1.75 ~ DRILL ~ DRLG ~ INTRM1 12:00 - 15:00 3.001 DRILL ;DRLG 1 INTRMI Description of Operations (4991' TVD) (124') ART .9 hrs w/ Sperry Sun geo pilot, 10-20k WOB, 120 rpm's, 626 gpm, 9.5 ppg mw, on bottom pressure 3720 psi, off bottom pressure 3650 psi, on bottom torque 15k ft/Ib, off bottom torque 11 k ftllb, PU wt 200k, SO wt 140k, Rot wt 167k. SPR's, circ 10 min, monitor well. Static. Backream f/ 10537' to 9820' bit depth (ghost reamer to shoe). Rotate 150 rpm, pump 650 gpm w/ 3950 psi. Torque 11-12k POOH wt f/ 9820' to 9157'. No problems. Monitor well. Static, blow down fillup line. Circ 2xBU @ 9157'. 650 gpm w/ 3850 psi. 130 rpm, 11 k ft/Ib torque. Circ total 1658 bbls. PU wt 180k, SO wt 135k. Monitor well. Pump dry job, blow down top drive. POOH f/ rotary stearable failure. Stand back 4" HWDP, lay down 1 joint 4" HWDP and accelerators,- - cohtinueworking BHA, break bit. Download MWD. UD MWD and Geopilot. Clear rig floor of tools. BHA #7. PU 7600 Geopilot (ser # 103), filled reference housing w/ grease, cleaned connections on Geopilot flex and smart blade stab, MU bit (SEC FSF 2653 w/ (3) 18's & (3) 16's). Sperry Sun upload MWD. Continue MU BHA #7, install 6-3/4" flex collars. RIH w/ flex collars, 1 stand 5" HWDP. Shallow test MWD. RIH w! 5" HWDP f/ derrick, PU jars and accelerators. Bit depth/BHA 792'. RIH w/ Weatherford 5" dp f/ 792' to 9165'. Ran 88 stands 5" f/ derrick, filling pipe every 25 stands. Change elevators f/ 5" to 4". Prepare to move 37 stands Weatherford 4" HT 38 DP f/ driller's side of derrick to off driller's side. Move 37 stands Weatherford 4" HT 38 DP f/ driller's side of derrick to off driller's side. Change elevators f/ 4" to 5". POOH f/ 9165' to 6121'. Pulled 32 stands. Clear floor. PJSM on PU 5" dp. PU/rabbit w/ 2.88" drift--RIH w/ 5" dp f/pipe shed. Fill pipe @ 8499', RIH to 9165'. PU wt 210k, SO wt 128k Note: Picked up 96 joints (32 stands) of Weatherford 5" dp. Circ dp volume plus (200 bbls) @ 700 gpm w/ 3460 psi. Check MWD pulse, OK. Slip and cut drilling line. Service top drive. Continue in hole f/ 9160' to 10402'. Wash and ream f/ 10402' to 10537'. No fill, no problems. 120 rpm, 646 gpm w/3300 psi Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 10537'-10782' (5104' TVD) (245') ART 1.28 hrs w/ Sperry Sun geo pilot, 15-20k WOB, 120 rpm's, 575 gpm, 9.5 ppg mw, on bottom pressure 2590 psi, off bottom pressure 2400 psi, on bottom torque 18k ft/Ib, off bottom torque 17k ft/Ib, PU wt 230k, SO wt 140k, Rot wt 172k. ECD 10.87ppg Note: Pumped bit ball sweep (20 ppb nut plug med, 3% screenKleen, 1 ppb SAPP) @ 10592'. Directional drill 9-7/8" hole w/ Sperry Sun geo pilot f/ 10782'-11065' (5257' TVD) (283') ART 1.81 hrs w/ Sperry Sun geo pilot, 15-20k WOB, rnnrou. iuouicvw a.oY.w nm • • ConocoPhillips Alaska Page 16 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com -Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours Code Sub Phase Description of Operations Code 10/6/2005 ~ 12:00 - 15:00 3.00 DRILL DRLG INTRMI 120 rpm's, 550 gpm, 9.5 ppg mw, on bottom pressure 2490 psi, off bottom pressure 2350 psi, on bottom torque 18-21 k ft/Ib, off bottom torque 20k ft/Ib, PU wt 240k, SO wt 145k, Rot wt 175k. ECD 10.83 ppg 15:00 - 16:45 1.75 DRILL CIRC INTRM1 Circ 700 gpm w/ 3480 psi and recip w/ rotating @ 120 rpm. Pump 42 bbls sweep. 16:45 - 17:30 0.75 DRILL TRIP INTRMI Monitor well, POOH slowly f! 11065' to 10450'. 17:30 - 17:45 0.25 DRILL CIRC INTRMI Pump dry job. 17:45 - 19:00 1.25 DRILL TRIP INTRMI Continue POOH f! 10450' to 9165' 19:00 - 19:15 0.25 DRILL OTHR INTRM1 Monitor well @ shoe. Blow down top drive. 19:15 - 21:00 1.75 DRILL TRIP INTRMI Continue POOH f/ 9165' to 4598'. 21:00 - 22:30 1.50 DRILL PULD INTRM1 PU 40 Weatherford 5" LoTads to rig floor to make up while POOH. 22:30 - 00:00 1.50 DRILL TRIP INTRM1 Continue POOH installing LoTads one per stand on stands 5" dp. 12 made up @ 2359 hrs 00:00 - 03:30 3.50 DRILL TRIP INTRMI Continue POOH f/ 3456' to 792' installing LoTads one per stand on- stands 5" dp. Total of 40 LoTads have been installed on dp in derrick. 03:30 - 03:45 0.25 DRILL OTHR INTRM1 Clear rig floor. 03:45 - 05:00 1.25 DRILL PULD INTRM1 PU 5" HWDP, rabbit to 2.883, RIH f/ 792' to 1173'. 05:00- 06:00 1.00 DRILL TRIP INTRM1 POOH w/ 5" HWDP f/ 1173' to 417'. 06:00 - 07:00 1.00 DRILL TRIP INTRMI Handle BHA # 7. UD Accelerators, hyd jars, stand flex collars in derrick. 07:00 - 07:45 0.75 DRILL OTHR INTRMI Download Sperry Sun MWD. 07:45 - 09:00 1.25 DRILL PULD INTRMI Work BHA # 7. Break 9-7/8" Sec FSF 2653 bit, UD Sperry Sun MWD and 7600 Geo pilot, ser No. 103. 09:00 - 09:30 0.50 DRILL OTHR INTRM1 Clear rig floor. 09:30 - 10:45 1.25 DRILL PULD INTRM1 Work BHA # 8. PU 7" Sperry Sun motor, MU Hughes HCM 605 bit w/ 10:45 - 11:30 11:30 - 12:00 12:00 - 12:15 12:15 - 12:30 12:30 - 16:00 16:00 - 18:30 18:30 - 19:15 19:15 - 21:15 21:15 - 22:15 22:15 - 22:30 22:30 - 22:45 7-16/32" nozzles(TFA 1.374), adjust bend on motor to 1.22 deg. 0.75 DRILL OTHR INTRM1 Upload Sperry Sun MWD. 0.50 DRILL PULD INTRM1 Continue handling BHA # 8, flex collars and one stand of 5" HWDP. 0.25 DRILL OTHR INTRMI Flow test MWD @ 555 gpm w/ 1000 psi. 0.25 DRILL PULD INTRMI Continue PU BHA # 8. PU/MU Weatherford Daily6- 1/4"jars, one stand 5".Weatherford HWDP and 6 1/4" accelerators to 417'. Blow down top drive. 3.50 DRILL TRIP INTRM1 RIH w/ Weatherford 5" DP f/ 417' to 6 stands and a single 5" dp (1023'), install Weatherford 9.875" ghost reamer, continue RIH w/ 59 stands total in hole Weatherford 5" dp to bit depth of 6036'. Fill pipe every 25 stands. 2.50 DRILL TRIP INTRM1 Start adding 5" Weatherford LoTads to pipe run in hole. Add IoTads to 25 stands f/ 6036' to 9195'. 0.75 DRILL CIRC INTRM1 Fill pipe. Spot 60 bbls, 6.5% Steel tube EP pill in casing. Circ 200 bbls. 2.OOI DRILL OTHR ~ INTRM1 1.00 DRILL TRIP INTRM1 0.25 DRILL REAM INTRMI 0.25 DRILL DRLG INTRMI 22:45 - 23:30 0.75 DRILL CIRC INTRMI 23:30 - 00:00 0.50 DRILL ,DRLG ; INTRM1 Install roller guide f/mud bucket hanging line. Move clamp on Kelly hose. Continue trip in hole f/ 9195' to 10984'. Precautionary wash and ream f/ 10984' to 11065'. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 11065'-11080' (5263' TVD) (15') ART 0.0 hrs AST .15 hrs., 15-20k WOB, 120 rpm's, 550 gpm, 9.5 ppg mw; on bottom pressure 2490 psi, off bottom pressure 2350 psi, on bottom torque 18-21 k ft/Ib, off bottom torque 20k ft/Ib, PU wt 240k, SO wt 145k, Rot wt 175k: ECD 10.83 ppg Circ the EP mud tube pill out of hole prior to connection. Directional drill 9-7/8" hole wJ Sperrydrill 7l8-6.0 mtr w/ 1.22 deg bend f/ 11080'-11115' (5282' TVD) (35') ART 0.0 hrs AST .15 hrs., 15-20k WOB, 120 rpm's, 550 gpm, 9.5 ppg mw, on bottom pressure 2490 psi, off bottom pressure 2350 psi, on bottom torque 18-21 k ft/Ib, off bottom rnn[ea: iuouic~uo a,ov.w nm ConocoPhillips Alaska Page 17 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1 C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date 10/7/2005 10/8/2005 From - To Hours Code Sub Code 23:30 - 00:00 0.50 DRILL DRLG 00:00 - 06:00 DRILL DRLG 06:00 - 12:00 12:00 - 18:00 18:00 - 00:00 110/9/2005 100:00 - 06:00 06:00 - 07:00 07:00 - 08:30 08:30 - 08:45 08:45 - 12:00 Phase INTRM1 INTRM1 6.00 DRILL I DRLG INTRMI 6.001 DRILL I DRLG I INTRMI 6.00 I DRILL DRLG INTRM1 6.001 DRILL DRLG INTRM1 1.00 DRILL DRLG INTRMI 1.501 DRILL CIRC INTRM1 0.25 DRILL TRIP INTRMI 3.25 DRILL DRLG INTRMI Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations torque 20k ft/Ib, PU wt 240k, SO wt 145k, Rot wt 175k. ECD 10.83 ppg Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 11115'-11618' (5484' TVD) (503') ART 1.96 hrs AST 1.86 hrs., Total hrs on bit = 4.33 hrs, Total hrs on jars = 157.61 hrs,15-29k WOB, 120 rpm's, 650 gpm, 9.6-9.8 ppg mw, on bottom pressure 3500-3580 psi, off bottom pressure 3300-3400 psi, on bottom torque 14-18k ft/Ib, off bottom torque 16-18k ft/Ib, PU wt 240k, SO wt 152k, Rot wt 188k. ECD 10.83-11.0 ppg Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 11618'- 11994' (5597' TVD) (376') ART 3.1 hrs AST 1.27 hrs., Total hrs on bit = 7.98 hrs, Total hrs on jars = 161.26 hrs, 15-30k WOB, 120 rpm's, 698-680 gpm, 9.7 ppg mw, on bottom pressure 3580-3860 psi, off bottom pressure 3400-3750 psi, on bottom torque 16-14k ft/Ib, off bottom torque 16-13k"ft/Ib, PU wt 240-245k, SO wt152-150k, Rot wt 188-T86k. ECD 11.0-11.55 ppg Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f! 11994'- 12464' (5737' TVD) (470') ART 3.36 hrs AST .40 hrs., Total hrs on bit = 11.74 hrs., Total hrs on jars = 165.02 hrs, 15-30k WOB, 120 rpm's, 680-660 gpm, 9.7-9.8 ppg mw, on bottom pressure 3860-3980 psi, off bottom pressure 3750-3640 psi, on bottom torque 14-18k ft/Ib, off bottom torque 13-14k ft/Ib, PU wt 245-250k, SO wt 150-154k, Rot wt 186-188k. ECD 11.0-11.46 ppg Note: Pumped 40 bbl weighted sweep 11.9 ppg/300 vis @ 12269'. Control drill 12269' @ 150'/hr f/ ECD's. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 12464'- 12822' (5846' TVD) (358') ART 1.79 hrs AST 1.48 hrs., Total hrs on bit = 15.01 hrs., Total hrs on jars = 168.29 hrs, 15-25k WOB, 120 rpm's, 680-650 gpm, 9.8 ppg mw, on bottom pressure 3920-4125 psi, off bottom pressure 3720-4026 psi, on bottom torque 15-17k ft/Ib, off bottom torque 13-15k ft/Ib, PU wt 245-250k, SO wt 150-154k, Rot wt 186-192k. ECD 11.41-11.3 ppg Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 12822'- 13050' (5915' TVD) (228') ART 2.19 hrs AST 1.25 hrs., Total hrs on bit = 18.45 hrs., Total hrs on jars = 171.73 hrs, 14-16k WOB, 120 rpm's, 650-675 gpm, 9.8 ppg mw, on bottom pressure 3830-4100 psi, off bottom pressure 3745-3980 psi, on bottom torque 15-17k ft/Ib, off bottom torque 14-15k ft/Ib, PU wt 245k, SO wt 155-160k, Rot wt 186-195k. ECD 11,3-11.02 ppg Note: Pumped 20 bbls 120 vis 10.4 ppg sweep @ 12991'. Pumped 15 bbl lubtex tube pill f/ sliding @ 12,998'. Pump 50 bbl 185 vis sweep @ 13040'. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 13050'- 13131' (5939' TVD) (81') ART .8 hrs AST 0.0 hrs., Total hrs on bit = 19.25 hrs., Total hrs on jars = 172.53 hrs, 14-16k WOB, 120 rpm's, 664 gpm, 9.85 ppg mw, on bottom pressure 4100 psi, off bottom pressure 3745psi, on bottom torque 16-17k ft/Ib, off bottom torque 15k ft/Ib, PU wt 245k, SO wt 160k, Rot wt 195k. ECD 11.02 ppg Circ sweep to surface. POOH 1 stand, continue to circ w/ working pipe f/ 13035' to 12940'. Circ @ 185 spm 664 gpm w/ 3700 psi. Rotate 120 rpm. RIH f/ 12940' to 13131', make connection. Directional drill 9-7/8" hole w! Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 13131'- 13351' (6002' TVD) (220'} ART 1.43 hrs AST .85 hrs., Total hrs • ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Start: 9/11/2005 Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours Code Sub Phase 10/9/2005 (08:45 - 12:00 12:00 - 13:30 Code 3.25 ~ DRILL ~ DRLG INTRMI 1:501 DRILL I DRLG I INTRM1 13:30 - 14:00 0.50 RIGMNT RGRP INTRM1 14:00 - 14:45 0.75 RIGMNT RGRP INTRM1 14:45 - 18:00 3.25 DRILL DRLG 1NTRM1 18:00 - 22:00 4.00 DRILL DRLG INTRM1 22:00 - 00:00 I 2.00 DRILL CIRC INTRM1 10/10/2005 100:00 - 00:30 I 0.501 DRILL TRIP INTRMI 00:30 - 02:00 1.501 DRILL DRLG INTRM1 02:00 - 06:00 4.00 DRILL ~ WIPR INTRMI 06:00 - 06:30 0.50 DRILL OTHR INTRM1 06:30 - 07:30 1.00 RIGMNT RSRV INTRM1 07:30 - 10:30 3.00 RIGMNT RGRP INTRM1 10:30 - 12:00 1.50 DRILL WIPR INTRM1 12:00 - 13:45 1.75 DRILL WIPR INTRMI 13:45- 16:00 2.25 DRILL REAM INTRMI 16:00 - 18:00 2.00 DRILL DRLG INTRM1 Page 18 of 44 Spud Date: 7/30/2005 End: Group: Description of Operations on bit = 21.53 hrs., Total hrs on jars = 174.81 hrs, 6-15k WOB, 120 rpm's, 660 gpm, 9.9-10.1 ppg mw, on bottom pressure 4000=3800 psi, off bottom pressure 3740-3480 psi, on bottom torque 17-18k ft/Ib, off bottom torque 13-15k ft/Ib, PU wt 250k, SO wt 160k, Rot wt 195-192k. ECD 11.02-11.2 ppg Directional drill 9-7/8" hole w/Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 13351'- 13415' (6021' TVD) (64') ART .31 hrs AST .31 hrs., Total hrs on bit = 22.15 hrs., Total hrs on jars = 175.43 hrs, 10 k WOB, 120 rpm's, 668 gpm, 10.2 ppg mw, on bottom pressure 3840 psi, off bottom pressure 3740 psi, on bottom torque 16k ft/Ib, off bottom torque 15k fUlb, PU wt 250k, SO wt 160k, Rot wt 192k. ECD 11.44 ppg Service blocks and top drive. Work on #2 mud pump. Repair # 2 mud pump. Replaced liner gasket. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6:0 mtrw/ 1.22 deg bend f/ 13415'- 13587' (6071' TVD) (172') ART 1.19 hrs AST .75 hrs., Total hrs on bit = 24.09 hrs., Total hrs on jars = 177.37hrs, 8-15 k WOB, 120 rpm's, 654 gpm, 10.2 ppg mw, on bottom pressure 3860 psi, off bottom pressure 3720 psi, on bottom torque 16k ft/Ib, off bottom torque 15k ft/Ib, PU wt 250k, SO wt 160k, Rot wt 192k. ECD 11.39 ppg Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 13587'- 13798' (6143' TVD) (211') ART 1.69 hrs AST 1.11 hrs., Total hrs on bit = 26.89 hrs., Total hrs on jars = 180.17 hrs, 8-17 k WOB, 120 rpm's, 650 gpm, 10.2 ppg mw, on bottom pressure 3860-4000 psi, off bottom pressure 3720-3820 psi, on bottom torque 16k ft/Ib, off bottom torque 15k ft/Ib, PU wt 250k, SO wt 160k, Rot wt 200 k. ECD 11.39 ppg Note: pumped mutplug, lubetex sweep f/ sliding @ 13,638'. Pumped 50 bbl 12.2 ppg, 200 vis sweep @ 13,735' (before HRZ). Circ @ 658 gpm w/ 3850 psi, circ sweep out of hole, circ toal of 2 x BU while rotating @ 120 rpm w/ 14k torque. Stand back a stand per hour f/ 13798' to 13514'. Circ total of 28,500 strokes (2437 bbls). After circulating hole clean, RIH in hole f/ 13514' to bottom @ 13798'. No problems. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 13798'- 13909' (6177' TVD) (111') ART .91 hrs AST 0.0 hrs., Total hrs on bit = 27.8 hrs.,. Total hrs on jars = 181.08 hrs, 8-17 k WOB, 120 rpm's, 188.5 motor rpm, 655 gpm, 10.2 ppg mw, on bottom pressure 4047 psi, off bottom pressure 3900 psi, on bottom torque 17k ft/Ib, off bottom torque 15k ft/Ib, PU wt 250k, SO wt 160k, Rot wt 195 k. ECD 11.39 ppg Short trip to 10-3/4" casing shoe: POOH wet f/ 13909' to 9203'. Pulled good, no problems. Clean rig floor after wet trip. Service rig and top drive. Replace liner wear plate middle cylinder, #2 mud pump. Run pump & verify proper working order. Trip in hole f/ 9203' to 11171', fill pipe every 25 stands. Continue trip in hole f/ 11171' to 13800', fill pipe every 25 stands. Precautionary wash and ream f/ 13,800' to 13,890' w/ 530 gpm & 3300 gpm (ECD 11.9 ppg). Circ and condition mud and hole, work up to 600 gpm w/ ECD 11.58 ppg. BG gas 20-40 units, max gas 80 units Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 13909'- 14047' (6223' TVD) (138') ART .99 hrs AST .64 hrs., Total hrs Nnntea: ~usuauuo asa:~aHm • ConocoPhillips Alaska Page 19 of 44 Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date From - To 10/10/2005 16:00 - 18:00 18:00 - 00:00 10/11 /2005 00:00 - 00:30 00:30 - 01:30 01:30 - 03:00 03:00 - 06:00 06:00 - 12:00 12:00 - 18:00 1 C-28 1 C-28 ROT -DRILLING D15CM@conocophillips.com Doyon 15 Hours Code Sub Phase Code 2.00 ~ DRILL ~ DRLG ~ INTRM1 6.00 I DRILL DRLG 0.501 RIGMNTI RGRP 1.001 DRILL DRLG 1.501 RIGMNTI RGRP 3.00 DRILL DRLG DRILL DRLG 6.001 DRILL I DRLG INTRMI I NTRM 1 I NTRM 1 INTRM1 INTRMI INTRM1 INTRMI Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005. Group: Rig Number: 15 Description of Operations on bit = 29.43 hrs., Total hrs on jars = 182.71 hrs, 8-17 k WOB, 120 rpm's, 174 motor rpm, 600 gpm, 10.2 ppg mw, on bottom pressure 3600 psi, off bottom pressure 3450 psi, on bottom torque 15-16k ft/Ib, off bottom torque 14k ft/Ib, PU wt 250k, SO wt 160k, Rot wt 190 k. ECD 11.37 ppg BG gas 15 units, max gas 68 units Directional drill 9-7/8" hole w/ Sperrydrill 7l8-6.0 mtr w/ 1.22 deg bend f! 14047'- 14463' (6356' TVD) (416') ART 4.58 hrs AST 0.0 hrs., Total hrs on bit = 34.01 hrs., Total hrs on jars = 187.29 hrs, 10-15 k WOB, 120 rpm's, 174-188 motor rpm, 600-650 gpm, 10.2 ppg mw, on bottom pressure 3600-3960 psi, off bottom pressure 3450-3750 psi, on bottom torque 15-18k fUlb, off bottom torque 14-15k ft/Ib, PU wt 252-255k, SO wt 160-165k, Rot wt 192-202 k. ECD 11.37-11.4 ppg BG gas 10-25 units, max gas 62 units Work pipe 8~ circ w/ #2 pump @ 94 spm/ 1400 psi while change out valve and seat in # 1 mud pump # 3 cylinder. Rotate 90 rpm w/ 16k torque. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 14463'- 14529' (6373' TVD) (66') ART .21 hrs AST .49 hrs., Total hrs on bit = 34.71 hrs., Total hrs on jars = 187.99 hrs, 10-15 k WOB, 120 rpm's, 174-188 motor rpm, 600-650 gpm, 10.2 ppg mw, on bottom pressure 3600-3960 psi, off bottom pressure 3450-3750 psi, on bottom torque 15-18k ft/Ib, off bottom torque 14-15k fUlb, PU wt 252-255k, SO wt 160-165k, Rot wt 192-202 k. ECD 11.37-11.4 ppg BG gas 10-25 units, max gas 65 units Back ream f/ 14529' to 14463', set back stand. Work pipe f/ 14463' to 14371' &circ w/ #1 pump @ 94 spm/ 1400 psi while change out liner gasket in # 2 mud pump # 1 cylinder. Rotate 90 rpm w/ 16k torque. Make connection . Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 14529'- 14735' (6432' TVD) (206') ART 1.52 hrs AST .54 hrs., Total hrs on bit = 36.77 hrs., Total hrs on jars = 190.05 hrs, 10-12 k WOB, 120 rpm's, 186 motor rpm, 640 gpm, 10.2 ppg mw, on bottom pressure 3970 psi, off bottom pressure 3810 psi, on bottom torque 15-18k ft/Ib, off bottom torque 14-15k ft/Ib, PU wt 255k, SO wt 170k, Rot wt 205 k. ECD 11.37-11.4 ppg BG gas 25-35 units, max 83 units Directional drill 9-7/8" hole w/Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 14735'- 14935' (6469' TVD) (200') ART 2.37 hrs AST 1.4 hrs., Total hrs on bit = 40.54 hrs., Total hrs on jars = 193.82 hrs, 10-15 k WOB, 120 rpm's, 174-183 motor rpm, 600-632 gpm, 10.2 ppg mw, on bottom pressure 3950-3980 psi, off bottom pressure 3620-3720 psi, on bottom torque 15-19k ft/Ib, off bottom torque 15-13k ft/Ib, PU wt 260-265k, SO wt 162-170k, Rot wt 205-198 k. ECD 11.37-11.28 ppg BG gas 30 units, max gas 84 units Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 14935'- 15068' (6489' TVD) (133') ART .49 hrs AST 2.1 hrs., Total hrs on bit = 43.13 hrs., Total hrs on jars = 196.41 hrs, 8-15 k WOB, 120 rpm's, 180-183 motor rpm, 620-632 gpm, 10.2 ppg mw, on bottom pressure 3980-3850 psi, off bottom pressure 3720-3690 psi, on bottom torque 17-19k ft/Ib, off bottom torque 13-17k ft/Ib, PU wt 265k, SO wt 162k, Rot wt 198 k. ECD 11.28-11.14 ppg BG gas 30 units, max gas 73 units • ConocoPhillips Alaska Page 20 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1 C-28 Event Name: ROI--DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours Code Sub Code 10/11/2005 ~ 18:00 - 21:30 ~ 3.50 ~ DRILL ~ DRLG 21:30 - 23:45 2.25 23:45 - 00:00 0.25 10/12/2005. 00:00 - 06:00 6.00 06:00 - 15:30 9.50 15:30 - 17:00 I 1.50 Phase INTRMI DRILL ICIRC I INTRM1 DRILL ~ REAM INTRM1 DRILL ~ REAM ~ INTRM1 DRILL ~ REAM ~ INTRM1 DRILL ICIRC I INTRM1 17:00 - 18:45 1..75 RIGMNT RSRV INTRMI 18:45- 22:30 3.75 DRILL TRIP INTRM1 22:30 - 00:00 1.50 DRILL TRIP INTRM1 10/13/2005 00:00 - 00:45 0.75 DRILL OTHR INTRM1 00:45 - 01:15 0.50 DRILL PULD INTRM1 01:15 - 03:30 2.25 WELCT OTHR INTRMI 03:30 - 06:00 2.50 WELCT BOPE INTRMI 06:00 - 07:00 07:00 - 07:45 07:45 - 08:30 1.00 WELCT BOPE INTRM1 0.75 WELCTu BOPE ~ INTRM1 0.75 OTHR INNTRMI Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 15068'- 15202' (6514' TVD) (134') ART .38 hrs AST 1.46 hrs., Total hrs on bit = 44.97 hrs., Total hrs on jars = 198.25 hrs, 8-10 k WOB, 120 rpm's, 181 motor rpm, 625 gpm, 10.2 ppg mw, on bottom pressure 3750 psi, off bottom pressure 3650 psi, on bottom torque 15-20k ft/Ib, off bottom torque 15-18k ft/Ib, PU wt 260k, SO wt 167k, Rot wt 209 k. ECD 11.2-11.3 ppg BG gas 30 units, max gas 76 units Circ and condition hole. Pump 45 bbls sweep weighted to 12.2 ppg 150 vis. Circ sweep to surface. Circ 18000 strokes (1539 bbls). Continue circulating w/ Backreaming w/ 120 rpm, torque 20k ft/Ib, 175-180 spm (646 gpm w/ 3600 psi )f/ 15130'-15100'. Continue circulating w/ Backreaming w/ 120 rpm, torque 20-17k ft/Ib, 175-180 spm (646 gpm w/ 3600 psi) f/ 15100'to13800'. Pulling 8-12 ft/min. Pulling 1 stand every 20-25 min. ECD 11.4-11.23 ppg. Monitor well, OK. Continue backreaming w/ 120 rpm, torque 17- 19k fUlb, 175-180 spm (646 gpm w/ 3600-3100 psi) f/ 13800'-9188' .Pulling 30-40 ft/min. Pulling 1 stand every 3-4 min then circ 2-3 min prior to break off stand. Avg 5-6 stands per hour pulled. ECD 11.4-11.23 ppg. Circ and reciprocate f/ 9198 to 9100', w/ rotating @ 120 rpm. Circ two bottoms up inside casing. Circ @ 650 gpm (motor rpm 188) w/ 3000 psi. Torque 9k ft/Ib. ECD 11.17 ppg. Slip & cut 102 ft of 1-3/8" drilling line. POOH w/ BHA #8 f/ 9198' to 417'. Record PU & SO weights. UD accelerators and jars, stand back flex collars, break bit. Download MWD/LWD. Download Sperry Sun MWD. UD Sperry sun MWD and Sperry drill motor. Drain stack. Pull FMC Wear bushing. RU to test BOPE. Weekly BOP test. Test Annular, choke manifold valves 16,17 and 18 and HCR on kill line to 250 psi low, then 3500 psi high. Hold each test 5 min. Test top pipe rams (variables 4-1/2" x7"), choke manifold valves 16,17,18 and HCR kill line to 250 psi low, then 4200 psi high. Hold each test 5 min. Testing against top pipe rams and choke manifold valves 12,13,14,15, 9, floor safety valve, HCR kill tine to 250 psi low, then 4200 psi high, hold each test 5 min. Test top pipe rams and choke valves 5,6,10,11, floor inside BOP and manual kill to 250 psi low, then 4200 psi, hold each test 5 min. Test top pipe, choke valves 1,4,7 and manual kill to 250 psi low, then 4200 high, hold each test 5 min. Test top pipe, choke valves 2,3,8, manual kill and upper top drive valve. to 250 psi low, then 4200 high, hold each test 5 min. Test top pipe rams, lower manula top drive valve, HCR choke line and manual kill line to 250 psi low, then 4200 psi high, hold each test 5 min.. Continue weekly BOP test. Test top pipe rams w/ manual choke valve to 250 psi low, then 4200 psi high, hold f/ 5 min each test. Test bottom pipe rams (3-1/2" x 6" variables) to 250 psi low then 4200 psi high, hold each test for 5 min. Test accumulator, pressure after closing 1500 psi, 200 psi build in 28 seconds, full charge attained in 3 min 34 seconds. Nitrogen backup is 5 bottles w/ 2400 psi avg. Pull test joint. RU to test blind rams. Test blind rams, choke valves 2,3,5,8, and manual kill valve to 250 psi low, then 4200 psi high, hold each test 5 min. R/D test equipment, Install FMC wear bushing. • ConocoPhillips Alaska Page 21 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours Code Sub Phase Code 10/13/2005 .08:30 - 09:30 1.00 WELCT ~ OTHR INTRM1 09:30 - 10:30 1.00 CEMEN OTHR INTRM1 10:30 - 12:30 2.001 CEMENTTRIP I INTRM1 12:30 - 16:30 I 4.001 CEMENTTRIP ~ INTRM1 16:30 - 18:00 1.50 ~ CEMENTCIRC ~ INTRM1 18:00 - 21:45 3.75 CEMENTTRIP INTRM1 21:45 - 22:00 0.25 CEMEN CIRC INTRMI 22:00 - 00:00 2.001 CEMENTCIRC INTRM1 10/14/2005 00:00 - 01:30 I 1.501 CEMENTCIRC I INTRMI 01:30 - 02:00 I 0.501 CEMENT PUMP INTRMI 02:00 - 02:45 I 0.751 CEMENTDIP I INTRM1 02:45 - 04:15 1.501 CEMENTTRIP INTRM1 04:15 - 04:30 0.251 CEMENT CIRC ~ INTRM1 04:30 - 05:00 I 0.50; CEMENTCIRC ~ INTRM1 05:00 - 05:15. 0.25 CEMENTTRIP INTRM1 05:15 - 05:45 0.50 CEMENT CIRC INTRMI 05:45 - 06:00 0.25 CEMENTTRIP INTRMI 06:00 - 07:00 1.00 CEMENT PUMP INTRM1 07:00 - 07:30 ~ 0.50 ~ CEMENT DISP ~ INTRMI 07:30 - 08:30 ~ 1.00 ~ CEMENTTRIP ~ INTRM1 Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig. Release: 11/17/2005 Group: Rig Number: 15 Description of Operations Blow down kill and choke lines and top drive. PU 3-1l2" handling tools f/ picking up 3-1/2" 9.3 ppf, L-80, EUE tubing for plug back. PU/MU 3-1/2" EUE mule shoe, 33 jts 3-1/2" 9.3 ppf L-80 EUE tubing, 3-1/2" EUE pin x 3-1/2" IF box crossover, 3-1 /2" IF pin x 4-1/2" IF box crossover for total length of 1035.34'. Change elevators to 5". R/D tubing tongs. Trip in hole w/ 5" dp f/ derrick f/ 1035' to 9215'. Record PU & SO wts every 10 stands. Circulate bottoms up @ 10-3/4" shoe. Circ @ 330 gpm w/ 750 psi, circ total of 697 bbls. Blow down top drive. PU wt 172k, SO wt 130k, block wt 70k. Continue RIH w/ 3-1/2" cementing stinger on 5" Make top drive connection, wash down w/ 3 bpm 525-550 psi, tag bottom @ 15202'. SO wt w/o rot while circ 160k, PU wt w/o rot while ~ circ 250k. Rotate 40 rpm w/ 14k ft/lb torque, PU wt 200k. Circulate staging pumps up f/ 3 bpm to final 8.72 bpm w/ 1150 psi. Rotate @ 40 rpm w! 14k torque. Reciprocate 30' stroke. Circulate @ 8.72 bpm w/ 1150 psi. Rotate @ 40 rpm w/ 14k torque. Reciprocate 30' stroke. PJSM w/ dowel) and rig crew while circulating. Circ total of 1668 bbls. Break off and stand back stand # 147, PU single f/ pipe shed. PU wt 250k, SO wt 160k. RU head pin, Dowell pump 5 bbls water, test lines to 3000 psi, pump additional 15 bbls water f/total of 20 bbls water ahead, mix and pump ', 57.6 bbls 15.8 ppg class "G" w/ additives @ 5.2 bpm, initial pressure ~I640 psi, final pressure 128 psi, pump 2 bbls water in string, turn over to rig f/ displacment. Rig Displace cement @ 7.26 bpm w/ initial pressure of 630 psi, final pressure of 1040 psi. Pump 252 bbls mud to balance cement in string and open hole. Top of cement w/ dp irr hole 14570'. UD single, POOH slow (9 ft/min) f/ 15171' to 14218'. Top of cement with dp out of cement is 14591' MU top drive, circulate @ 650 gpm w/ 2850 psi. Circ 316 bbls. Rotate @ 40 rpm w/ 14k torque. Recip f/ 14218'-14124'. Stop pumps, break off top drive, drop Baker wiper, circ wiper down @ 640 gpm. w/ 2650 psi follow w/ 252.8 bbls mud. Rotate 40 rpm w/ 14k torque. Recip f/ 14218' to 14124'. POOH f/ 14218' to 13930'. Spot 20 bbl Hi Vis pill @ 13930' to 13689' w/ pipe in hole. (after pulling .out --will be f/ 13930' to 13719'.) Chase pill w/ 2800 strokes. Pump @ 550 psi w/ 2150 psi. POOH f/ 13930' to 13740'. PU wt 245k, SO wt 160k RU head pin, dowel) pump 5 bbls water, test lines to 3000 psi, pump an additional 15 bbls water f/ total of 20 bbls water ahead, mix and pump 58 bbls 15.8 class "G" w/ additives @ 4.7 bpm, initial pressure 425 psi, final pressure 50 psi, pump 2 bbls water in string, turn over to rig f! displacement. Rig Displace cement @ 7.26 bpm w/ initial pressure of 640 psi, final pressure of 1100 psi. Pump 226bb1s mud to balance cement in string and open hole. Top of cement w/ dp in hole 13108'. POOH slowly f/ 13740' to 13170'. (9 ft/min pulling speed). Top of cement with dp out is 13129', should circ 40' (3.3 bbls of cement f/ hole) rnnieu. ~uo~icvw a.e+.va n... • • ConocoPhillips Alaska Page 22 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1 C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophifiips.com Rig Name: Doyon 15 Date From - To Hours Code Code Phase 10/14/2005 07:30 - 08:30 1.00 CEMENII TRIP INTRM1 08:30 - 10:45 2.25 CEMENT CIRC INTRM1 Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations f! top of cement @ 13170'. Circ @ 13170' recip pipe f/ 13170' to 13075'. Pump 35 bbl biozan sweep) follow w/ 970 bbls mud @ 650 gpm w/ 2950 psi, then slow rate to 3-4 bpm, final of 1225 bbls pumped. Rotate @ 40 rpm w/ 12-18k ft Ib. 10:45 - 12:00 1.251 CEMENIjCIRC ~ INTRM1 12:00 - 12:30 0.50 CEMEN~CIRC INTRM1 12:30 - 14:00 1.50 CEMEN TRIP INTRM1 14:00 - 17:00 3.00 CEMEN TRIP INTRM1 17:00 - 19:30 2.50 CEMEN PULD INTRMI 19:30 - 20:30 1.00 CEMEN RURD INTRM1 20:30 - 20:45 0.25 DRILL SFTY INTRMI 20:45 - 22:00 1.25 DRILL PULD INTRMI 22:00 - 23:00 1.00 DRILL OTHR INTRMI 23:00 - 23:30 0.50 DRILL PULD INTRMI 23:30 - 00:00 0.50 DRILL TRIP INTRMI 10/15/2005 00:00 - 00:15 0.25 DRILL OTHR INTRMI 00:15 - 01:30 1.25 DRILL TRIP INTRM1 01:30 - 01:45 0.25 DRILL CIRC INTRM1 01:45 - 02:30 0.75 DRILL TRIP INTRMI 02:30 - 02:45 0.25 DRILL CIRC INTRMI 02:45 - 03:15 0.50 DRILL SFTY INTRMI 03:15 - 04:30 1.25 DRILL TRIP INTRM1 04:30 - 05:45 1.25 DRILL CIRC INTRM1 05:45 - 06:00 0.25 DRILL TRIP INTRM1 06:00 - 06:30 0.50 DRILL TRIP INTRMI 06:30 - 07:45 1.25 DRILL CIRC INTRMI 07:45 - 10:30 2.75 DRILL CIRC INTRM1 10:30 - 11:00 0.50 DRILL OTHR INTRMI 11:00 - 12:30 1.50 DRILL DRLG INTRM1 12:30 - 18:00 ~ 5.50 ~ DRILL j DRLG j INTRMI Stop, break off top drive, drop Baker wiper plug, circ 525 gpm w/ 2080 psi, rotate @ 40 rpm w/ 12-14k ft Ib torque. Rotating PU wt 190k, rotating SO wt 170k. Torque 12-14k. Pump dry job, blow down top drive. POOH w/ cementing stinger (1035' of 3-1/2" 9.3ppf L-80 EUE tubing) f/ 13170' to 9220' (csg shoe), Record PU & SO wt's every 5 stands in open hole. POOH w/ cementing stinger (1035' of 3-1/2" 9.3ppf L-80 EUE tubing) f/ 9220' to 1035', Record PU & SO wt's every 10 stands in casing. PJSM, RU to UD 3-1/2" tubing, lay down (2) x-o's, 33 jts 3-1/2" 9.3 ppf L-80 EUE tubing, and mule shoe stinger. R/D tubing pulling equipment, Clean rig floor. PJSM on PU/MU BHA #10 (9-7/8" Hughes HCM 605 bit w! 7" SperryDrill 7/8- 6 stage motor w/ 1.22 deg bend) PU/MU BHA #10 (9-7/8" Hughes HCM 605 bit w/ 7" SperryDrill 7/8- 6 stage motor w/ 1.22 deg bend) Upload Sperry Sun MWD. Continue PU/MU BHA # 10. Trip in hole w/ BHA # 10 f! 422' to 993'. Rotate through TAM Port collar @ 1001', PU Weatherford ghost reamer MU @ 1064' above bit, continue in hole to 1095'. Shallow test MWD @ 1095', 607 gpm w/ 1560 psi. OK. Trip in hole f/ 1095' to 3473': Fill every 25 stands. Record PU and SO wt's. Circ 100 bbls to clean up hole. Trip in hole f/ 3473' to 5100'. Record PU And SO wt's. Circ 100 bbls to clean up hole. Held safety stand down w/ drilling crew. Trip in hole f/ 5100' to 7129'. Record PU & SO wts Circulate bottom's up @ 7129', circ 407 gpm w/ 1390 psi, rotate 40 rpm w/ 8-9 ft/Ib torque. Trip in hole f/ 7129' to 8119'. Record PU and SO wt's. Trip in hole f/ 8119' to 9205'. Record PU and SO wt's. Circulate bottom's up @ 9205', circ 407 gpm w/ 1270 psi, rotate 40 rpm w/ 9-10 ft/Ib torque. PU wt 195k, SO wt 140k. Trip in hole f/ 9205' to 13135'. Record PU and SO wt's. MU top drive, break circ Tag cement plug @ 13170'. Verify firm cement pumping 3 bpm w/ 630 psi. Stall out 20k on bit. Pressure to 1150 psi . Drill firm cement f/ 13170' to 13400'. Drill w/ 650 gpm @ 3700 psi. on bottom pressure, 3540 psi off bottom pressure. 90 RPM w/ 20-21 k torque on bottom and 18-19K torque off bottom. Bit wt 10k. ECD 11.44 PPg• Sidetrack well @ 13400' MD (6016.83 TVD). Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 13400'- 13529' (6063' TVD) (129') ART 1.56 hrs AST 1.85 hrs., Total hrs on bit = 3.41 hrs., Total hrs on jars = 201.66 hrs, 10 k WOB, 90 rpm's, 188 motor rpm, 650 gpm, 10.2 ppg mw, on bottom pressure 3850 psi, off bottom .- • ConocoPhillips Alaska Page 23 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1 C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11-/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours Code Code Phase Description of Operations 10/15/2005 12:30 - 18:00 5.50 DRILL DRLG INTRM1 pressure 3800 psi, on bottom torque 18-24k ft/Ib, off bottom torque 18-21 k ft/Ib, PU wt 280k, SO wt 150k, Rot wt 187 k. ECD 11.27 ppg 18:00 - 22:30 4.50 DRILL DRLG INTRMI Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 13529'- 13612' (6100' TVD) (83') ART 1.65 hrs AST 1.06 hrs., Total hrs on bit = 6.12hrs., Total hrs on jars = 204.37 hrs, 8-10 k WOB, 120 rpm's, 188 motor rpm, 650 gpm, 10.2 ppg mw, on bottom pressure 3850 psi, off bottom pressure 3800 psi, on bottom torque 19-24k ft/Ib, off bottom torque 19-21 k ft/Ib, PU wt 280k, SO wt 150k, Rot wt 187 k. ECD 11.27 ppg 22:30 - 00:00 1.50 DRILL REAM INTRM1 Backream f/ 13612' to 13329' @ 650 gpm w/ 3600 psi, rotate @ 120 rpm due to hi torque. 10/16/2005 00:00 - 03:00 3.00 DRILL REAM INTRMI Backream f/ 13329' to 12670' @ 650 gpm w/ 3600 psi, rotate @ 120 rpm due to hi torque. 03:00 - 04:45 1.75 DRILL TRIP INTRMI Pump out of hole f/ 12670' to 11480'. Pump w/ 650 gpm and 3540 psi. 04:45 - 06:00 1.25 DRILL TRIP INTRMI Pull out of hole on elevators f/ 11480' to 10780'. PU wt 30-40k over prior trip in hole. 06:00 - 07:30 1.50 DRILL TRIP INTRM1 Continue POOH on elevators f/ 10780' to 9200'. Record PU & SO wt's every 5 stands. 07:30 - 08:30 1.00 DRILL CIRC INTRM1 Circ and clean floor, monitor well. Pump dry job, Blow down top drive. 08:30 - 10:00 1.50 DRILL TRIP INTRM1 POOH on elevator, inspecting LoTads. Record PU and SO wt's every 5 stands. 10:00 - 12:00 2.00 DRILL TRIP INTRMI Continue POOH f/ 6035' to 2410'. Record PU and SO wt's every 5 stands. 12:00 - 13:00 1.00 DRILL TRIP INTRM1 Continue POOH f/ 2410' to 1064', UD ghost reamer, POOH to BHA @ 422'. 13:00 - 14:30 1.50 DRILL TRIP INTRM1 Work BHA, monitor well, clean rig floor. Break and grade bit. Note: No problems noticed w/ LoTads. No problems w! BHA noticed. 14:30 - 15:45 1.25 DRILL OTHR INTRM1 Download Sperry Sun MWD, Upload MWD. 15:45 - 17:00 1.25 DRILL OTHR INTRMI MU Hughes MX-C1. 9-7/8" mill tooth bit (3-20/32" nozzle, 1-10/32" nozzle, MU BHA # 11. Flow test MWD, PU jars and accelerators. 17:00 - 18:00 1.00 DRILL TRIP INTRM1 TIH w/ BHA # 11 (mill tooth bit, motor w/ 1.22 deg bend, NO Ghost reamer) to 1850'. 18:00 - 19:30 1.50 DRILL TRIP INTRMI Continue trip in hole f/ 1850' to 5175'. Record PU and SO wt's every 5 stands. , 19:30 - 20:45 1.25 DRILL OTHR INTRM1 Fill pipe. H2S alarm in pits. Secure well. Abandon rig to safe briefing area (shop). All personal accounted for. Security, drilling safety, construction safety, and Pad drill site operator were notified. DSO (Jim Love and Jimmie Heazlett donned SCBA's and checked out. False alarm. Re-Man rig (KW Jones crew). Rig electrician check out sensor in pits. Sensor was replaced (reading high w/ 25 ppm calibration gas, reading was 35 ppm). 20:45 - 21:45 1.00 DRILL CIRC INTRM1 Circ bottoms up +, circ total of 428 bbls @ 400 gpm w/ 1300 psi. 21:45 - 23:15 1.50 DRILL TRIP INTRM1 Continue trip in hole f/ 5175' to 7615'. Record PU and SO wt's every 5 stands. 23:15 - 23:30 0.25 DRILL CIRC INTRMI Fill pipe, check flow, OK. 23:30 - 00:00 0.50 DRILL TRIP INTRM1 Continue trip in hole f/ 7615' to 9200'. Record PU and SO wt's every 5 stands. Fill pipe. monitor well. 10/17/2005. 00:00 - 02:00 2.00 RIGMNT RSRV tNTRM1 Siip and cut 105 of 1-3/8" drilling line. Reset crown o matic. 02:00 - 02:30 0.50 RIGMNT RSRV INTRM1 Service top drive. Change air filter. 02:30 - 02:45 0.25 DRILL ` TRIP INTRM1 i Continue in hole f/ 9200' to 9498'. PU wt 240k, SO wt 120k. 02:45 - 04:00 1.25 DRILL CIRC INTRMI Circ and condition mud in hole w/ recip and rotate f/ 9498' to 9399'. Rotate w/ 120 rpm, torque 17-18 ft Ib torque. Circ @ 650 gpm w/ 3190 psi. Rot wt while pumping and picking up 165k. • • ConocoPhillips Alaska Page 24 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours Code Code Phase 10/17/2005 ~ 04:00 - 05:45 ~ 1.75 ~ DRILL CIRC INTRMI 05:45 - 06:00 0.25 DRILL TRIP INTRM1 06:00 - 08:00 2.00 DRILL CIRC INTRMI 08:00 - 10:15 2.251 DRILL (TRIP I INTRM1 10:15 - 12:00. 1.75 DRILL CIRC INTRMI 12:00 - 12:45 0.75 DRILL CIRC . INTRMI 12:45 - 18:00 5.25 DRILL DRLG INTRM1 18:00 - 00:00 I 6.00 I DRILL I DRLG ~ INTRMI 10/18/2005 ~ 00:00 - 06:00 i 6:00 ~ DRILL DRLG ~ INTRM1 06:00 - 12:00 6.00 DRILL ~ DRLG ~ INTRM1 12:00 - 15:45 ~ 3.751 DRILL ,DRLG ~ INTRMI Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations Pull a stand, continue circulating and conditioning mud in hole w/ recip and rotate f/ 9399' to 9300'. Rotate w/ 120 rpm, torque 17-18 ft/ Ib torque. Circ another BU, then pump 35 bbls weighted to 12.2 ppg, 200 vis sweep. Circ @ 650 gpm w/ 3190 psi. Circ surf to surf. POOH f/ 9300' to inside casing @ 9202'. PU wt 235k, SO wt 130k. Continue circ to condition mud in hole. Circ @ 300 gpm w/ 1013 psi. Rotate w/ 50 rpm, 17-19k ft/Ib. Pump and spot Steel Lube EP (metal-metal lube)back to within 2000' of surface. Results After Steel tube in hole: PU wt 210k, SO wt 140k, rot wf 160k, torque 13-14k ft/Ib. Note: Improvement of 30K f/ PU, improvement of 20K f/ SO wt, Improvement of 4k ft Ib rot torque Trip in hole f/ 9108' to 13608'. Record PU & SO wt's every 5 stands. Fill pipe every 25 stands. Circ and condition mud @ 13608'. Circ 650 gpm w/ 3250 psi, rotate 120 rpm. Torque 23-24k ft!!b. Circ and condition mud. Circ 650 gpm w/ 3250 psi, rotate 120 rpm. Torque 19-20k ft/Ib. Directional drill 9-7l8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 13612'- 13791' (6176' TVD) (179'} ART 4.14hrs AST .54 hrs., Total hrs on bit = 4.68 hrs., Total hrs on jars = 209.05 hrs, 18-20 k WOB, 120 rpm's, 186 motor rpm, 640 gpm, 10.2 ppg mw, on bottom pressure 3320 psi, off bottom pressure 3240 psi, on bottom torque 20-22k ft/Ib, off bottom torque 18-19k ft/Ib, PU wt 270-260k, SO wt 140-150k, Rot wt 195 k. ECD 10.8 ppg Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 13791'- 14075' (6288' TVD) (284') ART 4.19hrs AST .85 hrs., Total hrs on bit = 9.72 hrs:, Total hrs on jars = 214.09 hrs, 20-22 k WOB, 120 rpm's, 188 motor rpm, 650 gpm, 10.2 ppg mw, on bottom pressure 3440 psi, off bottom pressure 3310 psi, on bottom torque 20k ft/Ib, off bottom torque 19k ft/Ib, PU wt 265k, SO wt 160k, Rot wt 200 k. ECD 10.8-11.0 ppg Background gas 15-25 units, max gas 90 units while drilling, bit depth @ 13919'. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w/ 1.22 deg bend f/ 14075'- 14333' (6397' TVD) (258') ART 2.61 hrs AST 1.77 hrs., Total hrs on bif = 14.1 hrs., Total hrs on jars = 218.47 hrs, 19-25 k WOB, 120 rpm's, 186-188 motor rpm, 642-649 gpm, 10.2 ppg mw, on bottom pressure 3440-3520 psi, off bottom pressure 3310-3400 psi, on bottom torque 19-20k ft/Ib, off bottom torque 19-20k ft/Ib, PU wt 260k, SO wt 160-170k, Rot wt 210 k. ECD 11.15 ppg Background gas 15 units, max gas 63 units. Directional drill 9-7/8" hole w/ Sperrydrill 7/8-6.0 mtr w! 1.22 deg bend f/ 14333- 14646' (6486' TVD) (313') ART 1.72 hrs AST 2.73 hrs., Total hrs on bit = 18.55 hrs., Total hrs on jars = 222.92 hrs, 20-22 k WOB, 120 rpm's, 180-187 motor rpm, 620-645 gpm, 10.2 ppg mw, on bottom pressure 3520-3550 psi, off bottom pressure 3390-3450 psi, on bottom torque 19-20k ft/Ib, off bottom torque 19-20k ft/Ib, PU wt 260-265k, SO wt 170k, Rot wt 210 k. ECD 11.15-11.26 ppg Background gas 23 units, max gas 69 units: Directional drill 9-7/8" hole w/ Sperrydrill 7l8-6.0 mtr w/ 1.22 deg bend f/ 14646'- 14800' {6509' TVD) (154') ART .44 hrs AST 1.75 hrs., Total hrs on bit = 20.74 hrs., Total hrs on jars = 225.11 hrs, 20-25 k WOB, 120 rpm's, 183-187 motor rpm, 630-645 gpm, 10.2 ppg mw, on bottom • ConocoPhillips Alaska Page 25 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common W ell Name: 1 C-28 Spud Date: 7/30/2005 Event Nam e: ROT -D RILLING Start: 9/11/2005 End: Contractor Name: D15CM @conoco phillip s.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 1 5 Rig Number: 15 Date From - To Hours Code Phase Description of Operations Code 10/18/2005 12:00 - 15:45 3.75 DRILL DRLG INTRM1 pressure 3510-3520 psi, off bottom pressure 3400 psi, on bottom torque 19-21 k ft/Ib, off bottom torque 17-20k ft/Ib, PU wt 265-270k, SO wt 170-160 k, Rot wt 210 k. ECD 11.26 ppg Background gas 12 units, max gas 34 units. SPR @ 14746', w/ 10.2 ppg (6502' TVD): # 1 @ 30 spm = 450 psi, 40 spm = 540 psi. # 2 @ 30 spm = 460 psi, 40 spm = 550 psi. 15:45 - 16:00 0.25 DRILL CIRC INTRMI Monitor well, Pump weighted to 12.2 ppg Hi-vis sweep @ 650 gpm w/ 3350 psi. Rotate at 120 rpm, torque 20-22 k ft lbs. Pumped 350 bbls. 16:00 - 18:00 2.00 DRILL CIRC INTRM1 Continue circ @ 650 gpm w/ 3340 psi, rotate @ 120 rpm w/ 20-23k ft Ib torque. Backream setting back a stand every 30 min while circulating hole clean. Depth @ 1800 hrs was 14655'. 18:00 - 23:30 5.50 DRILL CIRC INTRM1 Continue circ @ 650 gpm w/ 3340-3200 psi, rotate @ 120 rpm w/ 20-22k ft Ib torque. Backream, setting back a stand every 30 min while circulating hole clean. Backream f/ 14655' to 13890'. Circ total of 5-1/2 bottoms up (5848 bbls). SO wt w/ rot 190K. PU wt w/ rot 200k. Rot wt 192k 23:30 - 23:45 0.25 DRILL OTHR INTRMI Monitor well, blow down top drive. 23:45 - 00:00 0.25 DRILL TRIP INTRM1 POOH on elevators f/ 13890' to 13702'. 10/19/2005 00:00 - 01:45 1.75 DRILL TRIP INTRM1 POOH on elevators f/ 13702' to 11956'. Record PU & SO wt's every 5 stands. SLM. 01:45 - 02:00 0.25 DRILL OTHR INTRM1 Monitor well. Static. 02:00 - 03:45 1.75 DRILL TRIP INTRM1 POOH on elevators f/ 11956' to 9201'. Record PU & SO wt's every 5 stands. SLM. Calc fill????. Actual fill 49.5 bbls. Pulled wet w/mud bucket. Found LoTads on stand 120 and 119 bad. 03:45 - 04:00 0.25 DRILL OTHR INTRM1 Monitor well. Static. 04:00 - 05:30 1.50 DRILL CIRC INTRMI Circ and condition mud inside casing. Girc 400 gpm w/ 1350 psi. Rotate 50 RPM w/ 8k ft Ib torque. Pump 710 bbls. Rot wt 165, SO wt 135k, PU wt 200k 05:30 - 05:45 0.25 DRILL CIRC INTRM1 Pump dry job. Blow down top drive. 05:45 - 06:00 0.25 DRILL TRIP INTRM1 POOH on elevators f/ 9201' to 8904'. Record PU & SO wt's every 10 stands inside casing. SLM. 06:00 - 09:30 3.50 DRILL TRIP INTRM1 POOH on elevators f/ 8904' to 2705. Record PU & SO wt's every 10 stands inside casing. SLM. 09:30 -.10:30 1.00 DRILL TRIP INTRMI RIH w/ 8 stands of Weatherford 5" HWDP f/ derrick, UD 5" HWDP. 10:30 - 12:00 1.50 DRILL PULD INTRM1 Continue POOH f/ 2705', UD 72 joints(24 stands) Weatherford 5" DP. Strap in pipe shed. 12:00 - 12:15 0.25 DRILL SFTY INTRM1 PJSM on laying down BHA # 11 (mill tooth bit, motor w/ 1.22 deg bend). 12:15 - 14:15 2.00 DRILL PULD INTRM1 POOH, UD BHA # 11. 14:15 - 15:00 0.75 DRILL OTHR INTRMI Download MWD/LWD tools. 15:00 - 16:00 1.00 DRILL PULD INTRM1 Continue POOH, UD MWD tools, motor and bit. Clear floor of handling tools. ~, 16:00 - 16:30 0.50 WELCT OTHR INTRM1 Drain stack, Pull FMC wear bushing. 'i 16:30 - 17:00 0.50 WELCT OTHR INTRM1 RU 7-5/8" test joint w/ 10' pup (5"). RIH, monitor annulus. !, 17:00 - 18:00 1.00 WELCT OTHR INTRM1 Change top pipe rams f/ 4-1/2" x 7" variables to 7-5/8". 18:00 - 19:00 1.00 WELCT OTHR INTRM1 Continue change top pipe rams f/ 4-1/2" x 7" variables to 7-5/8". 19:00 - 20:00 1.00 WELCT OTHR INTRMI RU testing equipment. 20:00 - 20:30 0.50 WELCT BOPE INTRM1 Test 7-5/8" top pipe rams to 250 psi low and 4500 psi high. Hold each test 5 min. John Crisp, AOGCC, waived witnessing the test. 20:30 - 21:00 I 0.50 WELCT OTHR INTRM1 R/D testing equipment, drain stack. 21:00 - 21:45 ~ 0.75 CASE OTHR INTRMI Clear rig floor of tools not needed. 21:45 - 22:00 0.25 CASE RURD INTRM1 i RU to run 7-5/8" 29.7 ppf, L-80, BTC-M casing. 22:00 - 22:30 0.50 CASE OTHR INTRM1 ~ I Dry run 7-5/8" FMC hanger. Land @ 39.25' f/ rig floor. • • ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours Code Code Phase 10/19/2005 ~ 23:15 - 00:00 0.75 CASE SFTY INTRM1 10/20/2005 ~ 00:00 - 03:30 ~ 3.50 ~ CASE ~ RUNC ~ INTRM1 03:30 - 04:30 I 1.00 I CASE CIRC I INTRM1 04:30 - 06:00 1.501 CASE RUNC INTRMI 06:00 - 06:45 ~ 0.75 ~ CASE ~ RUNC ~ INTRMI 06:45 - 07:45 I 1.00 I CASE I CIRC I INTRM1 07:45 - 10:00 2.251 CASE RUNC INTRM1 10:00 - 11:15 1.25 CASE CIRC INTRMI 11:15 - 12:00 0.75 CASE RUNC INTRMI 12:00 - 15:00 3.00 CASE RUNC INTRMI 15:00 - 16:45 1.75 CASE RURD INTRM1 16:45 - 18:00 1.25 CASE CIRC INTRM1 18:00 - 19:30 1.501 CASE RUNC INTRM1 19:30 - 20:00 0.501 CASE. CIRC INTRM1 20:00 - 20:15 I 0.251 CASE RUNC INTRM1 20:15 - 21<30 I 1.251 CASE I CIRC INTRMI 21:30 - 22:30 1.00 CASE I RUNC INTRM1 22:30 - 23:00 I 0.501 CASE CIRC INTRMI 23:00 - 00:00 1.00 CASE OTHR INTRM1 10/21/2005 00:00 - 00:45 0.75 CASE RUNC INTRM1 1 00:45 - 01:30 0.75 CASE CIRC ; INTRMI 01:30 - 02:30 I 1.OOI CASE RUNC I INTRM1 Start: 9/11 /2005 Rig Release: 11/17/2005 Rig Number: 15 Page 26 of 44 Spud Date: 7/30/2005 End: Group: Description of Operations Finish RU to run 7-5/8" 29.7 ppf, L-80, BTC-M casing. PJSM on running 7-5/8" casing. Clean up walkway areas prior to running casing. Run 7-5/8" 29.7 ppf, L-80, BTC-M casing. PU/MU Weatherford model 303 FS, 2 jts 7-5/8" 29.7 ppf L-80 BTC-M casing, Weatherford model 402 Float Collar, fill pipe, check floats, ok. Continue running casing to jt # 20 in hole 850'. PU wt 95 k, SO wt 90 k. Circ w/ Dowell swage and 2" hose. Circ @ 3 bpm w/ 116 psi. Ciresurf- surf (72 bbls). R/D hose and swage. Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 850'-2126' jt # 50 in hole. Ran total of 22 bowspring centralizers on first 22 jts. Jts # 1 & # 2 ran stops in middle of jt, others on collars (total of 938'). At 2126' PU wt 120 k, SO wt 110 k. Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 2126'-2595' jt # 61 in hole. At 2595' PU wt 130k, SO wt 115k. Circ w/ Dowell swage and 2" hose. Circ @ 5 bpm w/ 240 psi. Circ BU+ (Circ total of 105 bbls). R/D swage and hose. Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 2595'-5082' jt # 120 in hole. At 5082' PU wt 160k, SO wt 130k. Circ w/ Dowell swage and 2" hose. Circ @ 5 bpm w/ 320 psi. Circ BU+ (Circ total of 205 bbls). R/D swage and hose. Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 5082'-6141' jt # 145 in hole. At 6141' PU wt 170k, SO wt 130k. Installed centering guide on jt # 133. Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 6141'-9194' jt # 217 in hole. At 9194' PU wt 220k, SO wt 135k. Change out bales and elevators. RU Frank's fillup tool, RU stabbing board. Held PJSM w/ crew. Circ w/ Frank's fillup tool w/ working pipe @ 9194'. Circ @ 5 bpm w/ 550 psi. Circ BU+ (Circ total of 350 bbls). Adding 15 bph water to mud system. Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 9194'-10179' jt # 240 in hole. At 10179' PU wt 245k, SO wt 135k. Circ w/ Frank's fillup tool w/ working pipe @ 10179'. Circ @ 5 bpm w/ 570 psi. Circ (Circ total of 100 bbls). Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 10179'-10390' jt # 245 in hole. At 10390' PU wt 260k, SO wt 150k. Circ w/ Frank's fillup tool w/ working pipe @ 10390'. Circ @ 5 bpm w/ 570 psi. Circ (Circ total of 400 bbls). PU wt 245 k, SO wt 145k while Circ @ 10390': Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 10390'-11460' jt # 270 in hole. At 11460' PU wt 280k, SO wt 155k. Circ w/ Frank's fillup tool w/ working pipe @ 11460'. Circ @ 5 bpm w/ 600 psi. Circ (Circ total of 100 bbls). Pu wt 270 k, SO wt 145k while circ. Cross threaded jt # 271 into # 270. UD Jt # 271(bad pin) and # 270 (bad box). Replace w/ Jt # 349 and Jt # 353. Continue to PU/MU 7-518" 29.7 ppf, L-80 BTC-M casing f/ 11460'-12316' jt # 290 in hole. At 12316' PU wt 300k, SO wt 150k. Circ w/ Frank's fillup tool w/ working pipe. @ 12316'. Circ @ 5 bpm w/ 660 psi. Circ (Circ total of 200 bbls). Pu wt 285 k, SO wt 145k while circ. Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 12316' to • • ConocoPhillips Alaska Page 27 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To .Hours Code Code Phase 10/21/2005 01:30 - 02:30 1.00 CASE RUNC INTRM1 02:30 - 04:15 1.75 CASE CIRC INTRM1 04:15 - 06:00 1.75 CASE RUNC INTRM1 Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations 13164' jt # 310 in hole. At 13164' PU wt 320k, SO wt 145k. Circ w/ Frank's fillup tool w/ working pipe @ 12316'. Circ @ 5 bpm w/ 700 psi initial, 610 psi final press. Circ (Circ total of 504bb1s). Pu wt 290-310k k, SO wt 140- 145 k while circ. Continue to PU/MU 7-5/8" 29.7 ppf, L-80 BTC-M casing f/ 13164' to 14739' jt # 347 in hole. At 14739' PU wt 370 k, SO wt 140 k. Washed last 2 joints down while circ 6 bpm 850-770 psi w/ Frank's fillup tool (Circ 40 bbls perjt). Installed centering guides on jt # 336, 339, 342 and 345. 06:00 - 06:30 I 0.501 CASE RUNC INTRM1 06:30 - 07:15 I 0.751 CASE I OTHR I INTRMI 07:15 - 10:15 I 3.00 CEMENIICIRC INTRM1 10:15 - 11:00 0.751 CEMENT PUMP INTRM1 11:00 - 13:30 I 2.501 CEMENli DISP I INTRMI 13:30 - 14:45 I 1.251 CEMENTI PULD I INTRM1 14:45 - 15:45 1.00 WELCT NUND INTRM1 15:45 - 17:30 1.75 WELCT EQRP INTRMI 17:30 - 18:00 0.50 CASE RURD INTRMI 18:00 - 21:00 3.00 DRILL PULD INTRM1 21:00 - 00:00 3.00 DRILL PULD INTRM1 10/22/2005 00:00 - 01:30 1.50 DRILL PULD INTRM1 01:30 - 03:00 1.50 DRILL PULD INTRM1 03:00 - 03:45 0.75 DRILL PULD INTRM1 03:45 - 05:15 1.50 DRILL PULD INTRM1 05:15 - 05:30 0.25 DRILL PULD INTRM1 05:30 - 06:00 0.50 DRILL PULD INTRM1 06:00 - 12:00 6.00 DRILL PULD INTRM1 12:00 - 14:00 2.00 DRILL PULD INTRM1 14:00 - 18:00 4.00 DRILL RIRD INTRM1 18:00 - 18:45 0.75 DRILL RIRD ~ INTRM1 18:45 - 00:00 5.25 DRILL PULD I INTRM1 10/23/2005 X 00:00-02:00 2.00 DRILL ( TRIP INTRM1 02:00 - 03:30 1.50 DRILL CIRC INTRMI 03:30 - 04:15 0.75 DRILL TRIP INTRM1 04:15 - 06:00 1.75 DRILL TRIP INTRM1 06:00 - 08:30 2.50 DRILL TRIP INTRMI PU/MU FMC hanger and landing joint. Land casing on hanger w/ 150 k down and 370 k. R/D Frank's fillup tool. RU Dowell cementing head. Blow down top drive. Circ w/ Dowell cement head. Stage rate up to 5 bpm w/ initial pressure of 610 psi. Reciprocate casing at 30 ft stroke 1 spm. Condition mud. YP=18. Held pre-job meeting. Batched up slurry. Pumped 10 bbl water and pressure tested lines to 3500 psi. Pump 20 bbl CW100 and 30 bbl MudPush. Drop bottom plug. Pump 58.5 bbl slurry @ 15.8 ppg. Drop top plug. Displace w/ 20 bbl water and turn over to rig pump Displace with 654.48 bbl mud with rig pump. Did not bump plug. Checked floats-OK. Shoe @ 14781'. Float collar @ 14,691'. Reciprocated pipe throughout job. Blow down and Rig down cementing equipment. R/D casing equipment and clear rig floor R/U and install 7-5/8" packoff. RILDS and R/D FMC Change top pipe rams to 4" from 7-5/8" Change out bales on top drive. Service rig and inspect derrick Pre job meeting. P/U 5" elevators. Install moushole in rotary table. Move to-tad stand and protectors to floor. Clear MWD equipment from shed. (Also cleaning pits and rockwasher) UD 19 stands of 5" d.p. from derrick UD 12 stands of 5" d.p. out of the derrick. UD 10 stands of 5" d.p. out of derrick and remove Lo-TAD's Clear floor of Lo-TADS UD 11 stands of 5" d.p. out of derrick and remove Lo-TAD's Clear floor of Lo-TADS UD 4 stands of 5" d.p. out of derrick and remove Lo-TAD's UD 132 jts of 5" d.p. and remove 44 Lo-Tads. UD 84 jts of 5" d.p. from derrick Removed all 5" handling subs from rig floor. Change saver sub to XT-39. P/U 4" handling equipment. Removed mouse hole from rotary table and cleared rig floor Continue P/U 4" handling tools, TIW valves and crossovers Pre job sfety meeting. P/U 156 joints 4" HT-38 d.p. from pipe shed (4914') Trip in hole w/ 4" HT-38 d.p. from derrick R/U and circulate down d.p. to flush. Bring Super Sliders to rig floor POOH w/ 14 stands of d.p. and stand back POOH. Install Super Sliders 1/jt and rack back. Continue POOH. Install Super Sliders 1~ and rack. Total of 33 stands rnrneu. icuuicuw a.u~.w niri • ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Start: 9/11/2005 Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours Code Code Phase 10/23/2005 ~ 06:00 - 08:30 ~ 2.50 DRILL TRIP INTRM7 08:30 - 10:00 1.50 DRILL TRIP INTRMI 10:00 - 10:30 0.50 DRILL SFTY INTRM7 10:30 - 12:00 1.50 DRILL PULD INTRMI 12:00 - 17:30 5.50 DRILL PULD INTRM7 17:30 - 18:00 0.50 DRILL CIRC INTRM7 18:00 - 21:30 3.50 DRILL TRIP INTRM7 21:30 - 22:30 1.00 DRILL TRIP INTRM7 22:30-23:00 0.50 DRILL PULD INTRMI 23:00 - 23:45 0.75 DRILL TRIP INTRM7 23;45 - 00:00 0.25 DRILL PULD fNTRM1 10/24/2005 00:00 - 02:00 2.00 DRILL TRIP INTRM7 02:00 - 02:15 0.25 DRILL PULD INTRM7 02:15 - 03:00 0.75 DRILL TRIP INTRM7 03:00 - 03:15 0.25 DRILL PULD INTRM7 03:15 - 04:00 0.75 DRILL TRIP INTRM7 04:00 - 04:15 0.25 DRILL PULD INTRMI 04:15 - 05:00 0.75 DRILL TRIP INTRM7 05:00 - 06:00 1.00 DRILL OTHR INTRM7 06:00 - 08:00 2.00 WELCT BOPE INTRM7 08:00 - 12:00 ~ 4.00I WELCTu BOPE ~ INTRMI 12:00 - 13:30 I 1.501 WELCTy BOPE ~ INTRM7 13:30 - 14:45 ~ 1.25 ~ WELCTI~ BOPE ~ INTRM7 14:45 - 18:00 ~ 3.25 ~ RIGMNT RGRP ~ INTRMI 18:00 - 18:30 0.50 WELCT OTHR INTRM7 18:30 - 19:00 0.50 RIGMNT RGRP INTRMI 19:00 - 21:00 2.00 RIGMNT RSRV INTRM7 21:00 - 22:00 1.00 RIGMNT RSRV INTRMI 22:00 - 23:00 1.00 WELCT BOPE INTRMI 23:00 - 00:00 1.00 DRILL PULD INTRM7 10/25/2005 00:00 - 00:30 0.50 RIGMNT RGRP INTRM7 00:30 - 02:00 1.50 DRILL PULD INTRMI 02:00 - 03:00 1.00 DRILL OTHR INTRM7 03:00 - 03:30 0.50 DRILL OTHR INTRM7 03:30 - 04:30 1.00 DRILL OTHR INTRM7 04:30 - 05:00 0.50 DRILL PULD INTRM7 05:00 - 05:45 0.75 RIGMNT RGRP INTRM7 05:45 - 06:00 0.25 DRILL OTHR INTRM7 06:00 - 07:30 1.50 RIGMNT RGRP INTRM7 Page 28 of 44 Spud Date: 7/30/2005 End: Group: Description of Operations of 4" HT-38 d.p. with Super Slider stood back. 99 Super Sliders picked up POOH w/ 42 stands of 4" HT-38 d.p. Clear floor of Super Slider tools and hold safety meeting on picking up d.p. P/U 70 joints of 4" XT-39 d.p. out of pipe shed. P/U 260 jts of 4" XT-39 d.p. out of pipe shed Circulate down drill pipe to flush. POOH w/ 60 stands 4" XT-39 d.p. and stand back. POOH w/ 4" XT-39 d.p. installing 1 Lo-TAD per stand Bring Lo-TAD's to rig floor POOH w/ 4" XT-39 d.p. installing 1 Lo-TAD per stand Bring Lo-TAD's to rig floor POOH w/ 4" XT-39 d.p. installing Lo-TAD'S Bring Lo-TAD'S to rig floor POOH w/ 4" XT-39 d.p. installing Lo-TAD's Bring Lo-TAD's to rig floor POOH w/ 4" XT-39 d.p. installing Lo-TAD's Bring Lo-TAD's to rig floor POOH w/ 4" XT-39 d.p. installing Lo-TAD'S Clear rig floor and rig up for BOP test Install test plug. R/U test equipment. Fill stack, choke manifold and lines. R/U test pump and chart recorder Test Hydril to 250 psi/3500 psi. Test upper pipe rams, HCR valves,and choke manifold to 250 psi/ 4100 psi. John Crisp, AOGCC, waived witnessing test. Test bottom pipe rams to 250 psi/4100 psi. Test accumulator and gas detectors. Test Blind rams to250 psi/4100 psi. Retrieve test plug. R/d test joint and test equipment. Blow down choke and kill lines and choke manifold. Clear floor Install new "Y" in standpipe manifold and M/U all connections and 4" valves. Weld up 4" drip plate around penetration in floor under stand pipe. Replace left side clamp cylinder on left side of Iron Roghneck. Rebuilt lower torque cylinder on Iron Roughneck. Weld spinner section guard on Iron Roughneck and adjust hydraulic hoses. Install wear ring. O.D.=10-3/4" I.D.=7-1/8", Length=12" Adjust Iron Roughneck hoses Cut and slip 130' of drilling line Service rig and top drive M/U and test HT-38 TIW and dart valves Safety meeting. M/U bit, geo-pilot and flex collar Replace hose on iron roughneck. PU smart stab- MWD, LWD nukes, PWD, HOC, welded blade stab, NM float sub. Upload MWD tools. Change out Slim Phase battery on RLL tool. Reconnect to tool. PU one flex drill collar, MU x-o's, shallow test MWD. Pressure test stand pipe and geo skid to 4000 psi. OK. Fix hose on iron roughneck. Load nuke sources. Repair hose fitting on top clamp cylinder of iron roughneck. Also re-routed hoses. • ConocoPhillips Alaska Page 29 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours Code Code Phase 10/25/2005 07:30 - 09:30 2.00 DRILL ~ PULD ~ INTRM1 09:30 - 12:00 2.50 CEMEN TRIP INTRM1 12:00 - 16:45 4.751 CEMEN7~TRIP I INTRMI 16:45 - 18:00 1.251 CEMENIIDSHO INTRM1 18:00 - 19:00 1.00 CEMEN7TRIP ~ INTRM1 19:00 - 21:00 2.00 I CASE I CIRC ~ 1NTRM1 21:00 - 22:00 1.00 CASE OTHR INTRMI 22:00 - 23:00 1.00 CASE DEQT INTRMI 23:00 - 23:15 0.25 CASE DEQT INTRM1 23:15 - 23:30 0.25 CASE CIRC INTRM1 23:30 - 00:00 0.50 CASE DEQT INTRM1 10/26/2005 00:00 - 01:00 1.00 CASE DEQT INTRMI 01:00 - 02:00 1.00 CASE DEQT INTRMI 02:00 - 03:15 1.25 CASE OTHR INTRMI 03:15 - 03:30 0.25 DRILL CIRC INTRM1 03:30 - 06:00 2.50 DRILL TRIP INTRM1 06:00 - 08:30 2.50 DRILL TRIP INTRMI 08:30 - 09:45 1.25 DRILL TRIP INTRM1 09:45 - 10:00 0.25 DRILL TRIP INTRM1 10:00 - 10:30 0.50 DRILL OTHR INTRMI 10:30 - 11:00 0.50 DRILL PULD INTRM1 11:00 - 12:00 1.00 DRILL OTHR INTRMI 12:00 - 12:30 0.50 DRILL PULD INTRMI 12:30 - 13:30 .1.00 DRILL PULD INTRM1 13:30 - 18:00 4.50 DRILL TRIP INTRM1 18:00 - 19:30 1.50 CASE CIRC INTRM1 19:30 - 20:00 0.50 CASE , DEQT INTRM1 20:00 - 22:00 I 2.001 DRILL ~ TRIP ~ INTRMI Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations Continue PU/MU BHA #12. RIH w/ 33 stands of Weatherford 4" HT38 drill pipe. Pickup jars, 2 stands of Weatherford 4" HR 38 drill pipe, then accelarator jars. RIH w/ Weatherford 4" HT 38 f/ 3745' to 8858.82' install crossover, RIH 4" Weatherford XT 39 drill pipe to 14598', filling pipe every 25 stands. Rotate @ 5 rpm to break in seals on Geo Pilot 5200 (ser # TL10). MU top drive, fiH pipe. Drill wiper rubbers and cement f/ 14598' to 14642'. Drill w/ 45 rpm and 300 gpm 3200 psi, torque 9k ft Ib. Rot wt 142k. Drill w/ 5k WOB. Black rubber at shakers on bottoms up (432 bbls pumped). Continue drilling cement inside of 7-5/8" casing f/ 14642' to 14670' got orange rubber in returns. WOB 4k, 50 rpm w/ 8k torque. 300 gpm w/ 3200 psi.. Rot wt 155k. Circ and condition mud f/ casing test. Circ total of 872 bbls. MW even out @ 9.8 PPg• Stand back a stand to 14640'. Blow down top drive. RU f/ casing test. Pump through kill line and cement line to clear air f! lines. Test casing @ 14640'. Pump @ 1/2 bpm, recording pressure vs volume. Pressure to 3500 psi w/ 108 strokes(9.23 bbls). Pressure bleed off to 1100 psi in 40 min. Check surface equipment, OK. Bleed off pressure. Bled back 2 bbls to pits. Open top pipe rams. Pump 20 bbls through cement line and string. Pump 3 bbls through kill line. Pump @ 1 /2 bpm, recording volume vs pressure up to 3500 psi w/ 142 strokes (12.14 bbls). After pumping @ 1/2 bpm, recording volume vs pressure up to 3500 psi w/ 142 strokes (12.14 bbls). Pressure bled off to 1200 psi in 35 min. Bleed off all pressure. Total of 2.75 bbls bled back. RU/Fill 10-3/4" x 7-5/8" annulus w/ water. Pressure 7-5/S" up to 3000 psi, annulus came up to 300 psi. Pressure of 7-5/8" declining, and also pressure of annulus declining. R/D testing lines. Blow down lines. Mix dry job. Monitor well, static. Pump dry job. Blow down top drive. POOH f/ 14640' to 9512'. PU wt 190k, SO wt 120k. POOH f/ 9512' to 3745', UD accelerators and Daily Jars. Continue POOH f/ 3745' to 420'. Stand back 4" Weatherford HWDP, UD BHA. PJSM w/ Sperry Sun. Remove nuke sources. Continue to UD BHA #12. Plug into Sperry tools. Download MWD tools, UD BHA. UD Sperry Sun Geo Pilot and bit. PU Baker Retrievamatic f/ 7-5/8" 29.7 ppf casing. RIH w/ Baker retievamatic on 4" Weatherford DP. Run in speed 60-70 fpm. RIH stand # 90. Circ and condition mud. Getting air out of system. PU wt 165k, SO wt 115k. Set Baker 7-5/8" 29.7 ppf retrievamatic packer @ 8522' w/ 3 rounds RH turns. Slack off to 80k on weight indicator.Test 7-5/8" casing (pressure up thru kill line) @ 1/2 bpm, monitoring pressure vs. volume. Pump total of 50 strokes (4.275 bbls) to achieve 3580 psi. (3550 psi when shut in}. Held pressure 10 minutes @ 3550 psi final pressure. No increase in pressure on 10-3/4" x 7-5l8" annulus. Bleed off pressure, open rams. Release Baker retrievamatic RIH w/ Baker retievamatic on 4" Weatherford DP f/ 8522' to 11734'. rnrnea. iuouiewo a..re.~ i C7 • ConocoPhillips Alaska Page 30 of 4a Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours Code Code Phase 10/26/2005 20:00 - 22:00 2.00 DRILL TRIP INTRMI 22:00 - 22:30 0.50 CASE DEQT INTRM1 22:30 - 23:45 1.25 DRILL TRIP INTRM1 23:45 - 00:00 0.25 CASE DEO7 INTRMI 10!2712005 ~ 00:00 - 01:00 ~ 1.00 ~ CASE ~ DEQT ~ INTRM1 01:00 - 01:15 0.251 DRILL TRIP ~ INTRM1 01:15 - 02:30 I 1.251 CASE I DEOT ~ INTRMI 02:30 - 02:45 0.25 DRILL TRIP INTRMI 02:45 - 09:45 7.00 DRILL TRIP INTRM1 09:45 - 10:00 0.25 DRILL OTHR INTRM1 10:00 - 10:15 0.25 DRILL SFTY INTRM1 10:15 - 11:15 1.00 DRILL PULD INTRM1 11:15 - 12:00 0.75 DRILL OTHR INTRM1 12:00 - 12:15 0.25 DRILL OTHR INTRM1 12:15 - 12:45 0.50 DRILL PULD INTRM1 12:45 - 13:15 0.50 DRILL PULD INTRMI 13:15 - 15:00 ~ 1.75 ~ DRILL ~ TRIP ~ INTRMI 15:00 - 18:00 3.00 DRILL TRIP INTRM1 18:00 - 19:30 1.50 DRILL TRIP INTRMI Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations Run in speed 60-70 fpm. RIH stand # 124. At Baker retievamatic element depth of 11734'. PU wt 195k, SO wt 125-130k. Set Baker 7-5/8" 29.7 ppf retrievamatic packer @ 11734' w/ 4 rounds RH turns. Slack off to 85k on weight indicator.Test 7-518" casing (pressure up thru kill line} @ 1!2 bpm, monitoring pressure vs. volume. Pump total of 62 strokes (5.301 bbls) to achieve 3540 psi. (3530 psi when shut in). Held pressure 5 minutes @ 3520 psi final pressure. No increase in pressure on 10-3/4" x 7-5/8" annulus. Bleed off pressure, open rams. Release Baker retievamatic. RIH w/ Baker retievamatic on 4" Weatherford DP f/ 11734' to 14570'. Run in speed 60-70 fpm. RIH stand # 154. At Baker retievamatic element depth of 14570'. PU wt 220k, SO wt 135k. Set Baker 7-5/8" 29.7 ppf retrievamatic packer @ 14570' w/ 5 rounds RH turns. Slack oft to 92k on weight indicator. At Baker retievamatic element depth of 14570'. PU wt 220k, SO wt 135k. Slacked off to 92k on weight indicator.Test 7-518" casing (pressure up thru kill line) @ 1!2 bpm, monitoring pressure vs. volume. Pump total of 75 strokes (6.4125 bbls) to achieve 3560 psi. (3530 psi when shut in). Held pressure 15 minutes @ 3510 psi final pressure. No increase in pressure on 10-3/4" x 7-5/8" annulus. Bleed off pressure, open rams. Release Baker retievamatic. RIH w/ Baker retievamatic on 4" Weatherford DP f/ 14570' to 14660'. Run in speed 60-70 fpm. RIH stand # 155 to 64' in (element of retrievamatic @ 14660). At Baker retrievamatic element depth of 14660'.PU wt 220k, SO wt 137k. Slacked off to 90k on weight indicator.Test 7-518" casing (pressure up thru kill line) @ 112 bpm, monitoring pressure vs. volume. Pump total of 75 strokes (6.4125 bbls) to achieve 3560 psi. (3560 psi when shut in}. Held pressure 40 minutes @ 3550 psi final pressure. No increase in pressure on 10-3/4" x 7-5/8" annulus. Bleed off pressure, open rams. Release Baker retievamatic. Measured 5 3/4 bbl returns. Charted test. Pull stand # 155 and stand back in derrick. Blow down top drive. POOH w/ Baker retrievamatic. UD packer. Clean and clear rig floor. RU to PU BHA # 14 (6-3/4" bit, geo Pilot, MWD/LWD). PJSM on PU BHA # 14. PU/MU BHA # 14. MU Security 6-3/4" FSF 2641 PDC bit, Sperry Sun Geo Pilot (5200) ser # TL10, NM GP flex, smart stab, 4-314" HOC, GRlRES, nukes, PWD tool, HOC, welded blade stab, float sub, circ sub. Test and download Sperry Sun MWD tools. Shallow test mwd tools @ 120'. Pump 300 gpm w! 1120 psi. PU NM DC to 150',. PJSM on loading nuke sources. Load sources. PU NM DC, (2) Weatherford crossovers, Daily DNT jars, (5) 4" HWDP, x-o to 373'. RIH w/ 33 stands Weatherford 4" HT 38 dp, PU Daily DNT jars, then 2 stands Weatherford 4" HT 38 dp, then Accelerators to depth of 3750.07' Fill pipe. Continue RIH w/ Weatherford 4" dp f/ 3743' to 13235'. Filling pipe every 25 stands. PU wt 200k, SO wt 120k. Continue R1H w/ Weatherford 4" dp f/ 13235' to 14670'. Filling pipe every 25 stands. PU wt 215k, SO wt 135k, Rot 160k. • ConocoPhillips Alaska Page 31 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1 C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11!2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours Code 10/27/2005 19:30 - 19:45 19:45 - 00:00 0.25 DRILL 4.25 CEME 10!2812005 100:00 - 02:30 02:30 - 04:00 04:00 - 05:30 05:30 - 06:00 06:00 - 07:00 07:00 - 08:45 08:45 - 09:45 09:45 - 10:45 10:45 - 12:00 2.50 1.50 1.50 0.50 1.00 1.75 1.00 1.00 1.25 12:00 - 18:00 I 6.00 18:00 - 19:45 I 1.75 19:45 - 20:15 0.50 20:15 - 20:30 0.25 20:30 - 21:00 0.50 21:00 - 00:00 3.00 ~ 10/29/2005 ~ 00:00 - 06:00 ~ 6.00 06:00 - 07:45 1.75 07:45 - 08:00 0.25 08:00 - 08:30 0.50 Sub Phase Code 1REAM INTRMI Iii DSHO I NTRM 1 DRILL I REAM J INTRM1 DRILL I CIRC INTRM1 DRILL CIRC INTRMI DRILL WIPR INTRMI DRILL OTHR INTRM1 DRILL FIT INTRMI DRILL OTHR INTRM1 DRILL TRIP PROD DRILL A DRLG I PROD DRILL I DRLG I PROD DRILL I REAM I PROD DRILL OTHR PROD DRILL TRIP PROD DRILL CIRC PROD DRILL TRIP PROD DRILL STRIP !PROD DRILL TRIP PROD DRILL PULD PROD DRILL I SFTY PROD Description of Operations Fill pipe. Wash and ream f/ 14462' to 14670'. MU top drive, fill pipe. Drill cement f/ 14670' to 14792'. Float collar appeared to be @ 14704' (13' deep). Drill w/ 45 rpm and 280 gpm 2260 psi, torque 8k ft Ib. Rot wt 160k. Drill w/ 5k WOB. Dri11 from 14, 871' to 14,919' (corrected depths. This was thought to be drilling cement and rat hole at the time of drilling, turns out to be new formation, after pipe correction of 78.69 tt). Drilled w! 40 rpm,9k torque on bottom, 8k torque off bottom, MW 9.8 ppg, pumping 273-277 gpm w/ 2350-2290 psi on bottom, off bottom 2138 psi. WOB is 4-6 k. PU wt 215-205k, SO wt 135-138k. Rot wt 160-162k. ECD 10.73 ppg Circulate and condition mud for FIT @ 300 gpm, 2740 psi, 40 rpm, 7k tt-Ibs torque. Mud was aired up. Pump 40 bbl spacer @ 9.7 ppg. Displace well with 9.2 ppg. Flo-pro mud Clean out under shakers and ditches. Pull up into shoe from 14,919' to 14,727' Blow down top drive. P/U= 215k, S/0= 135k, Rot=160k RU f/ Formation integrity test. Perform formation integrity test w! bit inside casing @ 14727'. The 7-5/8" casing shoe is @ 14781' (6507.7' TVD). MW 9.2 ppg. Applied 1120 psi w/ 31 strokes from #1 mud pump (2.7 bbls) for EMW of 12.5 ppg. Bled back 2.88 bbls when released pressure. Charted test. R/D tools f/FIT. Blow down choke manifold and kill line. Trip in hole f/ 14727' to 14885', pumped up check shot survey @ 14915'. Perform PWD/ECD baseline test w/ 9.2 ppg mud @ 14915'. 300 gpm w/ 60 rpm = 10.26 EMW. 300 gpm w/ 100 rpm = 10.29 EMW. 350 gpm w! 60 rpm = 10.36 EMW. 350 gpm w/ 100 rpm = 10.41 gpm. Record SPR's @ 14915'. PU wt 215k, SO wt 140k. Directional drill 6-3/4" hole w! SperrySun GeoPilot f/ 14919'- 15055' (6516' TVD) (136') ART 2.38 hrs, Total hrs on bit = 2.38 hrs., Total hrs on jars = ???? hrs, 10-15 k WOB, 90 rpm's, 275 gpm, 9.2 ppg mw, on bottom pressure 1850 psi, off bottom pressure 1800 psi, on bottom torque 10k ft/Ib, off bottom torque 6-7k ft/Ib, PU wt 210k, SO wt 140 k, Rot wt 150 k. ECD 10.27 ppg Directional drill 6-3/4" hole w/ SperrySun GeoPilot f/ 15055'- 15378' (6501' TVD) (323') ART 4.28 hrs, Total hrs on bit = 6.66 hrs., Total hrs on jars = ???? hrs, 10-12 k WOB, 100-140 rpm's, 231-350 gpm, 9.2 ppg mw, on bottom pressure 1510-3030 psi, off bottom pressure 1560-2980 psi, on bottom torque 10k ftllb, off bottom torque 8-10k ft/Ib, PU wt 210k, SO wt 135 k, Rot wt 160 k. ECD 10.27-10.81 ppg Backream out of hole f/ 15378' to 14727'. Ream with 100 rpm, 7k tt Ib torque. Pump 300 gpm w/ 2500 psi. Rotating up w/ 165k. Down wt 125k. Blow down top drive. Monitor well. Static. POOH wet f/ 14727' to 14634'. Circ up sample for geologist. POOH wet f/ 14634' to 10546'. SLM. PU wt @ 10546' is 175k, SO weight @ 10546' is 122k. POOH wet f/ 10546' to 2922'. SLM. PU wt @ 2922' is 115k, SO weight @ 2922' is 105k. Calc fi11765.05 bbls, Actual fill 92.5 bbls POOH wet f/ 2922' to 437'. SLM. No correction f/SLM. UD BHA # 14. PJSM w/ Sperry Sun hands. Then remove Nuke sources. runwu, iuw,c~~~ a.~..v~~v~ • ConocoPhillips Alaska Page 32 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conoco phillips.com Rig Name: Doyon 15 Date From - To Hours Code Code Phase 10/29/2005 08:30 - 08:45 0.25 DRILL PULD PROD 08:45 - 09:30 0.75 DRILL OTHR PROD 09:30 - 10:15 0.75 DRILL PULD PROD 10:15 - 10:45 0.50 DRILL PULD PROD 10:45 - 12:00 1.25 DRILL PULD PROD 12:00 - 13:00 1.00 DRILL PULD PROD 13:00 - 13:45 0.75 DRILL OTHR PROD 13:45 - 14:00 0.25 DRILL OTHR PROD 14:00 - 14:45 0.75 DRILL OTHR PROD 14:45 -15:00 0.25 DRILL OTHR PROD 15:00 - 15:30 0.50 DRILL SFTY PROD - 15:30 - 16:30 1.00 DRILL PULD- PROD 16:30 - 18:00 1.50 DRILL TRIP PROD 18:00 - 20:00 2.00 DRILL TRIP PROD 20:00 - 20:30 0.50 DRILL PULD PROD 20:30 - 23:30 3.00 DRILL OTHR PROD 23:30 - 23:45 0.25 RIGMNT RSRV PROD 23:45 - 00:00 0.25 RIGMNT RSRV PROD 10/30/2005 00:00 - 00:30 0.50 RIGMNT RSRV PROD 00:30 - 01:30 1.00 RIGMNT RSRV PROD 01:30 - 05:00 3.50 DRILL TRIP PROD 05:00 - 06:00 ~ 1.00 ~ DRILL ~ REAM ~ PROD 06:00 -12:00 I 6.00 I DRILL {REAM {PROD 12:00 - 18:00 ~ 6.00 ~ DRILL ~ REAM ~ PROD 18:00 - 22:30 i 4.50 ~uRILL j REAi~'I j PROD 22:30 - 00:00 1.501 DRILL REAM PROD { 10!3112005 00:00 - 06:00 06:00 - 09:30 6.00 I DRILL {REAM PROD 3.501 DRILL ', REAM I PROD Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations L/D BHA # 14. Download MWD tools.. L/D BHA # 14. Clear and clean rig floor. UD handling tools. PU BHA # 15. MU Hughes 6-3/4" HCM 505z PDC bit, Sperry Sun motor w/ 1.5 deg bend, float sub, welded blade stab, HOC, Sperry Sun MWD. PU nukes, PWD, orient and plug into tools. Download MWD toois. Shallow test MWD. Pump 349 gpm w1710 psi. Retest MWD and download MWD tool. Shallow test MWD. Pump 350 gpm w/ 710 psi. PJSM w/ Sperry Sun hands. Install Nuke sources. Continue PU BHA # 15. RIH w/ Weatherford 4" HT 38 dp f/ 458' to 4243'. PU wt @ 4243' is 125k, SO wt @ 4243' is 100k. RIH w/ Weatherford 4" HT 38 dp f/ 4243' to 7558'. Fill pipe every 25 stands. Change out top single on stand 75 (4" HT-38). Bad box. Replace joint. Change out saver sub on top drive. PJSM on cutting drilling line. Prepare to slip and cut 135' of drilling line. Prepare to slip and cut 135' of drilling line. Service top drive and grease crown. RIH w/ Weatherford 4" HT 38 then XT39 dp f/ 4243' to 7558'. Fill pipe every 25 stands. Trip displacement calculated 88.4 bbls, actual 95 bbls. Fill pipe, orient down, start troughing @ 15200' to 15209'. ND 6511'. Pump @ 321 gpm w/3330 psi, PU wt 210k. Down wt 135k. Start troughing @ 15200' to 15248'. TVD 6511'. Pump @ 339 gpm w! 3450 psi, PU wt 200k. Down wt 135k. Time drill 3 min per inch ff sidetrack F/ 15248' to 15254' (6511 TVD). Drilling w! Hughes 6-3l4" HGM 5052 jetted to .752 TFA and SperryDrill 6R-6.0 w/ ABI and 1.5 deg bend. AST 5.13 hrs, Total hours on bit = 5.13 hrs, Total hours on Jars 11.79 hrs. Pumping 339 gpm w/ 3460 psi on botom, 3440 psi off bottom. PU wt 210k, SO wt 125k. Time drill 3 min per inch f/sidetrack F/ 15254' to 15258' (6511 TVD). Drilling w/ Hughes 6-3/4" HCM 5052 jetted to .752 TFA and SperryDrill 6/7-6.0 w/ABI and 1.5 deg bend. AST .87 hrs, Total hours on bit = 6. hrs, Total hours on Jars 12.66 hrs. Pumping 339 gpm w/ 3460 psi on botom, 3440 psi off bottom. PU wt 210k, SO wt 125k. Time drill 3 min per inch f/ sidetrack F! 15270' to 15272' (6511 TVD). Drilling w/Hughes 6-314" HCM 5052 jetted to .752 TFA and SperryDrill 6/7-6.0 w! ABI and 1.5 deg bend. AST .3 hrs, Total hours on bit = 6.3 hrs, Total hours on Jars 12.96 hrs. Pumping 339 gpm w/ 3460 psi on botom, 3440 psi off bottom. PU wt 210k, SO wt 125k. Time dri113 min per inch f/ sidetrack F/ 15272' to 15281' (6510 TVD). Drilling w/ Hughes 6-314" HCM 5052 jetted to .752 TFA and SperryDrill 617-6.0 w! ABI and 1.5 deg bend. AST 2.45 hrs, Total hours on bit = 8.75 hrs, Total hours on Jars 15.41 hrs. Pumping 320 gpm w! 3920 psi on botom, 3940 psi off bottom. PU wt 210k, SO wt 135k. Attempt to time drill 3 min per inch f/sidetrack F/ 15278.' to 15305' (6510' TVD). Drilling w/ Hughes 6-3/4" HCM 5052 jetted to .752 TFA and SperryDrill 6/7-6.0 w/ABI and 1.5 deg bend. AST 1.09 hrs, Total hours on bit = 9.84 hrs, Total hours on Jars 16.5 hrs. Pumping 320 gpm • ConocoPhillips Alaska Page 33 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1 C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours Code Code Phase 10/31/2005 06:00 - 09:30 3.50 DRILL REAM PROD 09:30 - 10:00 0.50 DRILL OTHR PROD 10:00 - 12:00 2.00 DRILL TRIP PROD 12;00 - 18:00 6.00 DRILL TRIP 18:00 - 19:30 1.50 DRILL TRIP 19:30 - 20:00 0.50 DRILL I OTHR 20:00 - 21:00 1.00 DRILL OTHR 21:00 - 21:30 0.50 DRILL PULD 21:30 - 22:00 0.50 DRILL OTHR 22:00 - 23:00 1.00 DRILL OTHR 23:00 - 00:00 1.00 DRILL PULD 11/1/2005 00:00 - 00:45 0.75 DRILL OTHR 00:45 - 01:15 0.50 DRILL OTHR 01:15 - 01:45 0.50 DRILL SFTY 01:45 - 02:45 1.00 DRILL PULD 02:45 - 03:00 0.25 DRILL TRIP 03:00 - 03:45 0.75 DRILL PULD 03:45 - 06:00 2.25 DRILL TRIP 06:00 - 11:15 5.25 DRILL TRIP 11:15 - 13:45 { 2.50 ~ DRILL {REAM 13:45 - 14:00 I 0.251 DRILL I WIPR 14:00 - 15:30 1.501 RIGMNT{ RGRP 15:30 - 15:45 0.25 DRILL WIPR 15:45 - 18:00 2.25 DRILL REAM 18:00 - 19:37 { 1.62 {DRILL {REAM 19:37 - 19:38 0.02 DRILL OTHR I 19:38 - 00:00 4.37 DRILL ~ DRLG PROD PROD PROD 'PROD !PROD 'PROD ~' PROD ~ PROD i i i i PROD ~ PROD PROD ,PROD PROD PROD PROD PROD PROD PROD PROD PROD PROD PROD PROD PROD Spud Date: 7/30!2005 Start: 9/1112005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations w/ 3920 psi on botom, 3940 psi off bottom. PU wt 210k, SO wt 125k. MWD survey, monitor well. Static POOH wet w/ 1.5 deg motor to change bend to 1.76 deg. POOH f/ 15305' to 11303'. POOH wet w/ 1.5 deg motor to change bend to 1.76 deg. POOH f/ 11303' to 2400' POOH wet w/ 1.5 deg motor to change bend to 1.76 deg. POOH f/ 2400' to 370' Work BHA # 15. PJSM on nuke sources. Remove sources. Download MWD. Work BHA # 15. Inspect bit, adjust bend on motor f/ 15. deg to 1.76 deg. Check motor bearings. Orient MWD to motor. PU BHA # 16. MU Hughes 6-3/4" HCM 505z PDC bit, Sperry Sun 5" OD motor 6/7-6.0 with ABI w/ 1.76 deg bend, float sub, welded blade stab, GR/RES, HOC, Nukes, PWD, HOC. MU crosovers to be able to shallow test tools after downloading. Start uploading tools @ midnight. Uploading tools MWD tools. Shallow test tools @ 120'. Good test, blow down top drvie. Pre job safety meeting on nuke sources w/ crew. PU (1) flex drill collar to 150'. MU (1) flex collar, change out elevators to 4". MU x-o's and MU jars, then HWDP to 370' RIH wf BHA #16 on 12 stands Weatherford 4" HT 38 dp to 1504'. Change out elevators to 3 1/2". MU crossover, Anderguage agitator, shock tool and crossover to 1526'. Then change out elevators back to 4". Trip in hole w/ Weatherford 4" dp, install jars and accelerator jar, then running dp to 5190'. PU wt 118k, SO wt 108k. Continue trip in hole w/ Weatherford 4" dp, install jars and accelerator jar, then running dp to 14943'. Record PU & SO wt's, fill pipe every 25 stands. MU top drive, orient down, trough f/ 15000' to 15095'. PU wt 220k, SO wt 130k. Pumping 300 gpm w/ 3350 psi. POOH f/ 15095' to 14744' to work on # 2 mud pump liner gasker # 3 cylinder. Repair liner gasket on # 2 pump, # 3 cylinder. Note: # 1 pump down while repairing unibolt to attatch shock hose, unavailable to use at the time. Trip back in hole f! 14744' to 15022' to continue troughing f/ sidetrack. MU top drive, orient down, trough f1 15022' to 15087'. PU wt 220k, SO wt 130k. Pumping 300 gpm w/ 3350 psi. Continue troughing well f/ 15087' to 15118'. PU wt 220k, SO wt 130k. Pumping 300 gpm w/ 3350 psi. Well was sidetracked @ 15115' while troughing. Sidetrack original well @ 15115' (6522' TVD). (Survey @ 15141', 88.47 deg, azm 106.6 deg, 6522' TVD) (Survey @ 15188', 89.09', azm 108.18 deg, 6523.44 TVD ') (Survey @ 15234', 89.14 deg, azm 103.95 deg, 6524' TVD) (Survey @ 15282', 90.07 deg, azm 104.27 deg, 6524' TVD) Sidetracking original well f/ 15115' to 15370' (TVD = 6523'). ART = 1.48 hrs, AST = 1.22 hrs. Total hrs on bit =2.7 hrs. Total hours on Jars rnrneu: iuov,cvvo a..r,.w nm • ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours Code Sub Phase Code 11!1!2005 19:38 - 00:00 4.37 DRILL 11/2/2005 00:00 - 00:30 0.50 DRILL DRLG PROD DRLG ~ PROD 00:30 - 06:00 5.50 DRILL DRLG PROD 06:00 - 12:00 6.00 DRILL DRLH PROD 12:00 - 13:00 1.00 DRILL DRLH PROD 13:00 - 14:15 1.25 DRILL CIRC PROD 14:15 - 17:00 2.75 DRILL DRLH PROD 17:00 - 18:00 1.00 DRILL CIRC PROD 18:00 - 19:30 1.50 DRILL , SFTY ~ PROD 19:30 - 20:00 0.50 DRILL 20:00 - 21:30 1.50 DRILL OTHR 'PROD W1PR PROD Page 34 of 44 Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations = 19.2. Pumping 300-325 gpm w/ 3350-4100 psi on bottom, 3350-3500 psi off bottom. Motor RPM is 231-250. When rotating string @ 50 rpm torque is 8-9k ft/Ib, off bottom torque 7-8k. ECD=10.8-10.9 ppg. Background gas 25 units.PU wt 200k, SO wt 125k Sidetracking original well W/ Sperrydrill motor w/1.76 deg bend f/ 15370' to 15378' (TVD = 6523') (8'). ART = 0.0 hrs, AST = .02 hrs. Total hrs on bit =2.72 hrs. Total hours on Jars = 19.22. Pumping 307 gpm w/ 3850 psi on bottom, 3700 psi off bottom. Motor RPM is 236. When rotating string @ 50 rpm torque on bttm is 8-9k ft/Ib, off bottom torque 7-8k ft/bl. ECD=10.84 ppg. Background gas 25 units. PU wt 200k, SO wt 125k. Directional drill 6-3/4" hole w/ Sperrydrill motor w/ 1.76 deg bend f/ 15378'- 15491' (6520' TVD) (113') ART .72 hrs, AST 1.26 hrs. Total .hrs on bit =4:7 hrs.Total hrs on jars = 21.4 hrs, WOB 5-6k, 50 rpm's, motor rpm's 236-240, pumping 307-312 gpm, 9.2 ppg mw, on bottom pressure 3850-3970 psi, off bottom pressure 3700- 3740 psi, on bottom torque 8-9k ft/Ib, off bottom torque 7-8k ft/Ib, PU wt 200k, SO wt 128 k, Rot wt 160 k. ECD 10.8-10.94ppg Directional drill 6-3/4" hole w/ Sperrydrill motor w/ 1.76 deg bend f/ 15491'- 15734' (6526' TVD) (243') ART 2.13 hrs, AST 1.40 hrs. Total hrs on bit =8.23 hrs.Total hrs on jars = 24.73 hrs, WOB 5-6k, 50-60 rpm's, motor rpm's 237-243, pumping 308-315 gpm, 9.2 ppg mw, on bottom pressure 3890-4200 psi, off bottom pressure 3740-3940 psi, on bottom torque 8-9k ftflb, off bottom torque 6-7k ftllb, PU wt 205k, SO wt 128-125 k, Rot wt 160-150 k. ECD 10.94-11.09 ppg Directional drill 6-3/4" hole w/ Sperrydrill motor w! 1.76 deg bend f! 15734'- 15770' (6521.61' TVD) (36') ART .28 hrs, AST .28 hrs. Total hrs on bit = 8.79 hrs.Total hrs on jars = 25.01 hrs, WOB 5-6k, 50-60 rpm's, motor rpm's 237, pumping 308 gpm, 9.2-ppg mw, on bottom pressure 3890 psi, off bottom pressure 3680 psi, on bottom torque 8-9k ft/Ib, off bottom torque 6-7k ftllb, PU wt 205k, SO wt 125 k, Rot wt 150 k. ECD 10.92 ppg Circ, clean suction screens on both pumps. Working on MWD pump noise. Directional drill 6-3/4" hole w! Sperrydrill motor w/ 1.76 deg bend f/ 15770'- 15889' (6524.16' TVD) (119') ART 1.14 hrs, AST .6 hrs. Total hrs on bit = 10.53 hrs.Total hrs on jars = 26.15 hrs, WOB 5-6k, 50-60 rpm's, motor rpm's 237-245, pumping 308-319 gpm, 9.2 ppg mw, on bottom pressure 3890-3970 psi, off bottom pressure 3680-3840 psi, on bottom torque 8-9k ft/Ib, off bottom torque 6-7k ft/Ib, PU wt 205k, SO wt 125 k, Rot wt 150 k. ECD 10.8-10.92 ppg Circ 9.2 ppg MW @ 320 gpm w/ 3970 psi (10.8 ppg EMW), losing 60 bph. Circ @ 260 gpm w/ 2950 psi, losses stabilizing. Mixing 80 bbl LCM pill : 10 ppb safe cart 10, 10ppb safe carb 40, 20ppb, dyna red fine. Note: total losses to 1800 hrs = 192.5 bbls Pump 60 bbls LCM pill @ reduced rate while conducting Safety stand down w/ GPAI Team leader Randy Thomas, CPAI drilling Safety Specialist Mike Rodriguez, Doyon safety director Mike Peters, Doyon Drilling Operations Manager Todd Driskill, and Doyon Rig 15 dri{{ing Team. Monitor well, static. Allow LCM pill to soak. POOH slowly f! 15889' to 14747'. No problems • ConocoPhillips Alaska Page 35 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common W ell Name: 1 C-28 Event Name : R OT -D RILLING Contractor N ame: D 15CM@ conoco phillips .com ,Rig Name: D oyon 1 5 Date From - To Hours Code Code Phase ~~ 11/2/2005 21:30 - 22:30 1.00 RIGMNT RSRV PROD 22:30 - 00:00 1.50 RIGMNT RSRV PROD 11/3/2005 00:00 - 00:30 0.50 RIGMNT RSRV PROD 00:30 - 0130 1.00 DRILL CIRC PROD 01:30 - 01:45 0.25 DRILL CIRC PROD 01:45 - 02:00 0.25 DRILL CIRC PROD 02:00 - 03:00 1.00 DRILL CIRC PROD 03:00 - 03:15 0.25 DRILL CIRC PROD 03:15 - 04:00 0.75 DRILL CIRC PROD 04:00 - 04;15 0.25 DRILL TRiP PROD 04:15 - 04:30 0.25 DRILL OTHR PROD 04:30 - 05:00 0.50 DR1LL TRIP PROD 05:00 - 06:00 1.00 DRILL OTHR PROD 06:00 - 10:15 4.25 DRILL OTHR PROD 10:15 - 10:30 0.25 DRILL TRIP PROD 10:30 - 11:30 1.00 DRILL DRLH PROD 11:30 - 12:00 0.50 DRILL OTHR PROD 12:00 - 12:45 0.75 DRILL CIRC PROD 12:45 - 15:00 2.25 DRILL TRIP PROD 15:00 - 15:30 . 0.50 DRILL CIRC PROD 15:30 - 16:00 0.50 DRILL TRIP PROD Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations Service rig and top drive. Hang blocks. Slip and cut 64' of drilling line. Monitoring welt. Total fluid lost this tour (1800-midnight= 32.5 bbis Total fluid lost today 225 bbls Total losses to well = 225 bbis Hang blocks. Slip and cut 64' of drilling line. Monitoring well. MU top drive. Circ w/ working pipe f/ 14790' to 14841', 30 rpm, while monitoring losses. Staging pumps up to 2.5 bpm w/ 1100 psi Circ w/ working pipe f/ 14790' to 14841', 30 rpm, while monitoring losses. Staging pumps up to 4 bpm w/ 1520 psi Circ w/ working pipe f/ 14790' to 14841', 30 rpm, while monitoring losses. Staging pumps up to 5 bpm w/ 1860-1900 psi. ECD's 10.4-10.6 ppg. No losses apparent. Circ w/ working pipe f! 14790' to 14841', 30 rpm, while monitoring losses. Staging pumps up to 6 bpm (70 spm) w/ 2600 psi. ECD's 10.52 ppg. No losses apparent. Circ w/ working pipe f! 14790' to 14841', 30 rpm, while monitoring losses. Staging pumps up to 7 bpm (82 spm) w! 3308-3350 psi, 33-34% flow. ECD's 10.6 ppg. No losses apparent. Circ w/ working pipe f! 14790' to 14841', 30 rpm, while monitoring losses. Staging pumps up to 8 bpm (93 spm) w/ 3860-3960 psi, 34% flow. ECD's 10.63-10.84 ppg. No losses apparent. Trip in hole f/ 14841' to 15113'. Taking weight @ open hole sidetrack point. PU/ MU top drive, orient to low side. Slide through 15113' to 15121'. Trip in hole f/ 15121' to 15852'. MU top drive. Madd pass f/ 15852' to 15823'. Pulling speed 29' per hour. Rotating 30 rpm, torque 7-8k ft Ib pumping @ 76 spm (273 gpm) w/ 3100 rpm, 10.6ppg. Equiv circ density. Total fluid lost this tour(0000- 0600 hrs) is 66 bbis Total losses to well = 291 bbis Madd pass f/ 15823' to 15690'. Pulling speed 29' per hour. Rotating 30 rpm, torque 7-8k ft Ib pumping @ 76 spm (273 gpm) w/ 33040 rpm, 10.6ppg. Equiv circ density. Trip in hole f/ 15690' to 15899'. Directional drill 6-3/4" hole w/ Sperrydrill motor w/ 1.76 deg bend f/ 15899'- 15917' (6527' TVD) (28') ART .74 hrs, AST 0.0 hrs. Total hrs on bit = 11.27 hrs. Total hrs on jars = 26.89 hrs, WOB 5-6k, 50-60 rpm's, motor rpm's 237-245, pumping 308-319 gpm, 9.2 ppg mw, on bottom pressure 3890-3970 psi, off bottom pressure 3680-3840 psi, on bottom torque 8-9k fUlb, off bottom torque 6-7k ft/Ib, PU wt 205k, SO wt 125 k, Rot wt 150 k. ECD 10.8-10.92 ppg Madd pass f! 15917' to 15895'. Pulling speed 29' per hour. Rotating 30 rpm, torque 8-9k ft Ib pumping @ 76 spm (270 gpm) w/ 3040 rpm, 10.6ppg. Equiv circ density. Pump 50 bbis of 40 ppb LCM pill, spot this pill in open hole f! shoe to 15895' w! bit pulled out of hole to shoe. POOH f! 15895' to 14790'. 7-518" shoe @ 14780'. Circ w! working pipe ff 14790' to 14841', 30 rpm, while monitoring losses. Staging pumps up to 8.33 bpm(350 gpm) (97 spm) w/ 4230 psi, i 34% flow. ECD's 10.82 ppg. No losses apparent. ~ Trip in hole f/ 14841' to 15916'. Survey check shot @ 15183'. No D.:..~e.l~ 17/'lfll9M5 9~Rd'(13 AM • ConocoPhillips Alaska Page 36 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common W ell Name: 1 C-28 Event Nam e: R OT -D RILLING Contractor Name: D 15CM@ conoco phillips .com Rig Name: D oyon 1 5 Date From - To Hours Code Sub Code Phase 11/3/2005 15:30 - 16:00 0.50 DRILL TRIP PROD 16:00 - 18:00 2.00 DRILL DRLH PROD 18:00 - 19:15 1.25 DRILL CIRC PROD 19:15 - 19:30 0.25 DRILL DRLH PROD 19:30 - 19:45 0.25 DRILL CIRC PROD 19:45 - 21:00 1.25 DRILL TRIP PROD 21:00 - 21:45 0.75 DRILL OBSV PROD 21:45 - 22:15 0.50 DRILL CIRC PROD 22:15 - 00:00 1.75 DRILL TRIP PROD 11/4/2005 00:00 - 00:30 0.50 DRILL SFTY PROD 00:30 - 04;15 3.75 DRILL TRIP PROD 04:15 - 05:00 0.75 DRILL PULD PROD 05;00 - 05:30 0.50 DRILL TRIP PROD 05:30 - 06:00 0.50 DRILL OBSV PROD 06:00 - 07:00 1.00 DRILL TRIP PROD 07:00 - 08:00 1.00 DRILL OTHR PROD 08:00 - 09:15 1.25 DRILL PULD PROD 09:15 - 10:30 1.25 DRILL PULD PROD 10:30 - 11:30 1.00 WELCT OTHR PROD 11:30 - 12:00 0.50 WELCT OTHR PROD 12:00 - 17:30 5.50 WELCT BOPE PROD 17:30-17:45 j 0.25 I WELCT OTHR PROD Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations problems w/ trip. Directional drill 6-314" hole w/ Sperrydrill motor w/ 1.76 deg bend ff 15917'- 15987' (6530' TVD) (72'} ART .53 hrs, AST .64 hrs. Total hrs on bit = 12.44 hrs. Total hrs on jars = 27.42 hrs, WOB 5-6k, 50-60 rpm's, motor rpm's 237-245, pumping 325 gpm, 9.2 ppg mw, on bottom pressure 4030 psi, off bottom pressure 3900 psi, on bottom torque 8-9k fUlb, off bottom torque 8-9k fUlb, PU wt 215k, SO wt 130 k, Rot wt 150 k. ECD 10.7 ppg Note: total losses this tour (0600-1800 hrs)= 204 bbls Note: total losses to well @ 1800 hrs = 495 bbls Circ and condition mud and hole. MWD tools (Pulsar) not working. Directional drill 6-3/4" hole w/ Sperrydrill motofw/ 1.76 deg bend f/ 1598T- 16001' (6530' TVD) {14') ART .25 hrs, AST 0.0-hrs. Total hrs on bit = 12.69 hrs. Total hrs on jars = 27.67 hrs, WOB 5-6k, 50-60 rpm's, motor rpm's 231, pumping 300 gpm, 9.2 ppg mw, on bottom pressure 4250 psi, off bottom pressure 3500 psi, on bottom torque 10-11 k ft11b, off bottom torque 7-Sk fUlb, PU wt 215k, SO wt 130 k, Rot wt 150 k. ECD 10.7 ppg Circulate, spot 60 bbls LCM in open hole (pill will be in Open hole after bit pulled to shoe). Pill consists of 40 ppb LCM: 8 ppb Safe Carb 10, 8 ppb Safe Carb 40, 11 ppb Dyna Red fine, 13 bbls Dyna Red medium. MWD not detecting. POOH slowly f/ 16001' to 14747'. Calculated fill 7.4 bbls, actual 9.5 bbls. Monitor well. Mix dry job. Well taking 6 bph. Pump 11.2 ppb dry job (59 bbls/ 62 vis). Blow down top drive. POOH f/ 14747' to 9948' Total losses 1800-2359 hrs = 67 bbls Total losses today 337 bbls Total losses f/ well @ midnight = 562 bbls to the formation Safety meeting w/ crew on accident which occured 11-3-2005 in pit room. POOH f/ 9948' to 1528' Change out elevators to 3 1/2". UD crossover, shock tool, Anderguage agitator, and crossover. Rinse out agitator. Then change out elevators back to 4". POOH f/ 1504' to BHA @ 370.63' Monitor well. Lost .7 bbl in 15 min = 2.8 bph losses. Continue POOH w/ BHA # 16 f/ 371' to 150'. Flushed motor, UD flex collar. PJSM, Remove nuke sources. UD flex drill collar. Download MWD. Continue to UD BHA # 16. Drain stack. PU test joint. Pull wear bushing. RU to test BOPE. RU to circ below test plug w/ trip tank, to trip tank, to monitor losses while testing and keep hole full Fill stack and choke manifold w! water. Test BOPE. Test 250 psi low and 3500 psi high f/1 annular, test 250 low and 4200 psi high al{ other compnets. Hold each test f/ 5 min, charted test. Test accumulator. Witness of test waived by AOGCC inspector Chuck Scheve Pull test plug. Install FMC wear bushing. • • ConocoPhillips Alaska Page 37 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common W ell Name: 1 C-28 Event Nam e: ROT -D RILLING Contractor Name: D15CM@ conoco phillip s.com Rig Name: Doyon 1 5 Date From - To Hours Code Cod Phase . e 11!4!2005 17:45 - 19:15 1.50 WELCT OTHR PROD 19:15 - 19:30 0.25 DRILL SFTY PROD 19:30 - 22:00 2.50 DRILL PULD PROD 22:00 - 23:00 1.00 DRILL OTHR PROD 23:00 - 00:00 1.00 DRILL PULD PROD 11/5/2005 00:00 - 00:45 0:75 DRILL TRIP PROD 00:45 - 01:00 0.25 DRILL TRIP PROD 01:00 - 06:00 5.00 DRILL TRIP PROD 06:00 - 06:30 0.50 DRILL CIRC PROD 06:30 - 10:15 3.75 DRILL TRIP PROD 10:15 - 11:00 0.75 RIGMNT RSRV PROD 11:00 - 11:45 0.75 DRILL TRIP PROD 11:45 - 13:15 1.50 DRILL CIRC PROD 1-3:15 - 18:00 4.75 DRILL DRLH PROD 18:00 - 00:00 6.00 DRILL DRLH PROD 11/6/2005 ~ 00:00 - 01:45 I I 1.75 DRILL DRLH PROD Spud Date: 7/30/2005 Start: 9!11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations Blow down test pump. R/D floor safety valve and crossovers, pump in sub, dart valve and test joint. Clear rig floor. PJSM w/ Sperry Sun MWD and directional driller on picking up BHA. PU/MU BHA # 17. MU 6-3/4" FSF 2641 Sec bit, Sperry Sun geoPilot (ser # TL11), GeoPilot flex, smart stab, DM HOC, Gamma/Res, nukes, PWD, TM HOC. Upload Sperry Sun MWD. MU crossovers and shallow test MWD and GeoPilot. OK. Total losses today 84.1 bbls Total losses to well = 646.1 bbls Losses 0600 hrs to 1800 hrs = 5.3 bbls Losses 1800 to 2359 hrs = 2 bbls: Blow down top drive. MU welded blade stab, float sub, circ sub, (1) flex collar, PJSM on loadinglhandling nuke sources. Load sources. MU (1) flex collar, (2) crossovers, Jars and (5) 4" HWDP. Continue trip in hole f/ 373' to 7537'. PU wt 148k, SO wt 110k, Rot wt 125k. Fill pipe every 25 stands, recording PU/SO wts every 10 stands in cased hole. Total losses to well @ 0600 hrs 656.6 bbls. Fill pipe @ 7537'. Flow check. OK. Trip in hole w/ BHA #17. Fill pipe every 25 stands. Record PU/SO wt's every 10 stands. Service top drive and crown. Continue trip in hole f/ 14720' to 15940': Circ bottoms up pumping 271 gpm w/ 2630 psi while working pipe fJ 15940' to 16001'. PU wt 215k, SO wt 120k, Directional drill 6-3/4" hole w/ Sperry Sun GeoPilot 5200 (ser # TL11) f/ 16001'- 16245' (6560' TVD) (244') ART 3.43 hrs. Total hrs on bit = 3.43 hrs.Total hrs on jars = 31.09 hrs, WOB 5-10k, 90 rpm's, pumping 270-300 gpm, 9.2-9.1 ppg mw, on bottom pressure 2610-2850 psi, off bottom pressure 2475- 2850 psi, on bottom torque 10-11k ft/Ib, off bottom torque 8-9k ft/Ib, PU wt 215k, SO wt 125 k, Rot wt 153 k. ECD 10.88 ppg Directional drill 6-3/4" hole w/ Sperry Sun GeoPilot 5200 (ser # TL11) f/ 16245'- 16591' (6575'. TVD) (346') ART 4.29 hrs. Total hrs on bit = 7.72 hrs.Total hrs on jars = 35.38 hrs, WOB 8-10k, 90 rpm`s, pumping 270-300 gpm, 9.2-9.1 ppg mw, on bottom pressure 2610-3020 psi, off bottom pressure 2630- 3010 psi, on bottom torque 10-11 k ft/Ib, off bottom torque 10k ft/Ib, PU wt 205k, SO wt 122 k, Rot wt 152 k. ECD 11.17 ppg Note: Total fluid losses f/ well @ midnight = 1383.6 bbls. Fluid lost today = 737.5 bbls Mud fosses while drilling approx 60 bph. Pumped (4) 20 bbl LCM sweeps (25 ppb total, 15 ppb dyna red med + 10 ppb safecarb 250) @ 16,055', 16156', 16295', and 16424'. Directional drill 6-3/4" hole w! Sperry Sun GeoPilot 5200 (ser # TL11) f/ 16591'- 16684' (6575' TVD) (93') ART 1.09 hrs. Total hrs on bit = 8.8 hrs.Total hrs on jars = 36.47 hrs, WOB 8-10k, 90 rpm's, pumping 270-295 gpm, 9.2 ppg mw, on bottom pressure 2640-2730 psi, off bottom pressure 2630- 2710 psi, on bottom torque 11-12k ft/Ib, off ~ bottom torque 10-11 k ft/1b, PU wt 205k, SO wt 120 k, Rot wt 151 k. • ConocoPhillips Alaska Page 38 of ~4 Operations Summary Report Legal Well Name: 1 C-28 Common W ell Name: 1 C-28 Event Nam e: ROT -D RILLING Contractor Name: D15CM@ conoco philfip s.com Rig Name: Doyon 1 5 Date From - To Hours Code Lode Phase 11/612005 00:00 - 01:45 1.75 DRILL DRLH PROD 01:45 - 02:00 0.25 DRILL CIRC PROD 02:00 - 03:30 1.50 DRILL CIRC PROD 03:30 - 05:30 2.00 DRILL WIPR PROD 05:30 - 06:00 0.50 RIGMNT RSRV PROD 06:00 - 07:30 1.50 DRILL CIRC PROD 07:30 - 08:45 1.25 DRILL WIPR PROD 08:45 - 12:00 3.25 DRILL DRLG PROD 12:00 - 18:00 6.00 DRILL DRLG PROD 18:00 - 00:00 6.00 ~ DRILL ~ DRLG PROD A Spud Date: 7130/2005 Start: 9!11!2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations ECD 11.46 ppg Losses @ 60 BPH Circulate to condition hole for trip to shoe to treat losses. SPR Circulate and spot 70 LCM pill in open hole. 70 bbl pill = 15ppb Dyna red fine, 10 ppb Dyna red med, 10 ppb Safe Garb 250. POOH slowly from 16,594' to 14747' Fill calculated 10.83bb1's // Actual 10.0 bbl's Service top drive Circulate at casing shoe to allow EDC pressure to squeeze away LCM pill in open hole. Loosing 20 - 25 bph while circulating. 1.2 - 1.5 bph static loss. Hole volume from casing shoe to loss depth@ 15889' = 47 bbls Trip slowly into hole and ream last 90 feet to bottom with no problem or tight spots. Losses = 60 bph while circulating Directional drill 6-314" hole w1 Sperry Sun GeoPilot 5200 (ser # TL11) f! 16684' to 16870'(6575' ND) (186') ART 2.1 hrs. Total hrs on bit = 10.9 hrs.Total hrs on jars = 36.67 hrs, WOB 8-10k, 90 rpm's, pumping 270-250 gpm, 9.2 ppg mw, on bottom pressure 2540-2630 psi, off bottom pressure 2530- 2550 psi, on bottom torque 11-12k ft/Ib, off bottom torque 8-12k ft/Ib, PU wt 210k, SO wt 115 k, Rot wt 153 k. ECD 11.07 ppg.. Slowed pumps to 256 gpm reduced losses from 60 bph to 30 bph. Directional drill6-314" hole f/ 16870' to 17243'(6576' TVD) (373') ART 3.96 hrs. Total hrs on bit = 14.86 hrs.Total hrs on jars = 42.53 hrs, WOB 8-10k, 90 rpm's, pumping 270-250 gpm, 9.3 ppg mw, on bottom pressure 2780-2700 psi, off bottom pressure 2630- 2710 psi, on bottom torque 11-12k ft/Ib, off bottom torque 10-12k ft/lb, PU wt 205k, SO wt 120 k, Rot wt 152 k. ECD 11.46 ppg. Losses @ 30-50 bph. Directional drill 6-3/4" hole f 17243' to 17560' (6564' TVD) (317') ART 4.3 hrs. Total hrs on bit = 19.16 hrs.Total hrs on jars = 46.83 hrs, WOB 8-10k, 90 - 100 rpm's, pumping 270-250 gpm, 9.3 ppg mw, on bottom pressure 2900 psi, off bottom pressure 2850 psi, on bottom torque 11-12k ft/Ib, off bottom torque 10-12k ftllb, PU wt 200 k, SO wt 115 k, Rot wt 150 k. ECD 11.49 ppg. Losses @ 30 - 50 bph. Note: Total fluid losses f/ well @ midnight = 2172 bbls. Fluid lost today = 788 bbls Mud losses while drilling approx 30 - 50 bph. With reduced pump rate @ 260 gpm Pumped (5) 20 bbl LCM sweeps (25 ppb total, 15 ppb dyna red med + 10 ppb safecarb 250) @ 16,928', 17195', 16295', 17,330' and 17414'. Weight Up at 16880 @ 12:30 to 9.3ppg Note: Total fluid losses to well @ midnight = 3171 bbls. Fluid lost past 24 hours = 999 bbls Mud losses while drilling approx 30 - 40 bph with reduced pump rate @ 260 gpm Note: Total fluid losses to well @ midnight = 3171 bbls. Fluid lost past 24 hours = 999 bbls Mud losses while drilling approx 30 - 40 bph with reduced pump rate @ 260 gpm • ConocoPhillips Alaska Page 3~ of ~~ Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1 C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours Code Code Phase 11!6/2005 18:00 - 00:00 6.00 DRILL DRLG PROD 11/7/2005 00:00 - 06:00 6.00 DRILL DRLH PROD 06:00 - 12:00 6.00 DRILL DRLH PROD 12:00 - 18:00 6.00 DRILL DRLH PROD 18:00 - 00:00 6.00 DRILL DRLH PROD 11/8/2005 00:00 - 06:00 6.00 DRILL DRLH PROD 06:00 - 10:15 4.25 DRILL DRLH PROD 10:15 - 14:30 4.25 DRILL CIRC PROD 14:30 - 14:45 0.25 DRILL I f OBSV PROD Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations Directional drill 6-3/4" hole with Geo-pilot f /17560' to 17923(6565' TVD) (363') ART 4.06 hrs. Total hrs on bit = 23.22 hrs.Total hrs on jars = 50.89 hrs, WOB 8-10k, 90 -100 rpm's, pumping 260 gpm, 9.4 ppg ~ mw, on bottom pressure 2790 psi, off bottom pressure 2750 psi, on bottom torque 11-12k ft/Ib, off bottom torque 10-11 k ft/Ib, PU wt 200 k, i SO wt 110 k, Rot wt 150 k. ECD 11.48 ppg. Losses @ 30 - 60 bph. 'Continue to Directional drill 6-3/4" hole with Geo-pilot f / 17,923 to 18,315(6563' ND) (392') ART 4.22 hrs. Total hrs on bit = 27.44 hrs.Total hrs on jars = 55.11 hrs, WOB 8-10k, 100-110 rpm's, pumping .260 gpm, 9.4 ppg mw, on bottom pressure 2950 psi, off bottom pressure 2930 psi, on bottom torque 12-13k ft/Ib, off bottom torque 11-12k ft/Ib, PU wt 215 k, SO wt 110 k, Rot wt 150 k. ECD 11.48 ppg. Losses @ 30 - 60 bph. Continue to Directional drill 6-3/4" hole with Geo-pilot f / 18,315to 18645'(6565' ND) (330') ART 4.12 hrs. Total hrs on bit = 31.56 hrs.Total hrs on jars = 59.23 hrs, WOB 8-10k, 100-110 rpm's, pumping 268 gpm, 9.4 ppg mw, on bottom pressure 3080 psi, off bottom pressure 3060 psi, on bottom torque 13k ft/fb, off bottom torque 11-12k ft/lb, PU wt 210 k, SO wt 110 k, Rot wt 146 k. ECD 11.48 ppg. Losses @ 30 - 50 bph. Pumping 20 bbl LCM sweeps every 2 hours with 15 ppb mix2 fine, 10 ppb mix2 med, & 10 ppb safe carb 250 Continue to Directional drill 6-3/4" hole with Geo-pilot f ! 18645' to 18, 943(6565 to 6563' TVD) (298') ART 3.69 hrs. Total hrs on bit = 35.25 hrs. Total hrs on jars = 62.06 hrs, WOB 8-10k, 100-110 rpm's, pumping 268 gpm, 9.4 ppg mw, on bottom pressure 3060 psi, off bottom pressure 3010 psi, on bottom torque 12-13k ft/Ib, off bottom torque 11-12k ft/lb, PU wt 210 k, SO wt 110 k, Rot wt 145 k. ECD 11.48 ppg. Losses @ 30 - 60 bph. 62 units maximum gas Pumping 20 bbl sweeps every 2 hours with 15 ppb Mix2 fine, 10 ppb Mix2 med & 10 ppb Safe-carb 250. Continue to Directional drill 6-3l4" hole with Geo-pilot f / 18, 943 to 19278' 6565'ND (344') ART 4.47 hrs. Total hrs on bit = 39.72 hrs. Total hrs on jars = 66.63 hrs, WOB 8-12k, 100-110 rpm's, pumping 268 gpm, 9.5 ppg mw, on bottom pressure 3090 psi, off bottom pressure 3080 psi, on bottom torque 13k ft/Ib, off bottom torque 12k ft/Ib, PU wt 220 k, SO wt 105 k, Rot wt 145 k. ECD 11.48 ppg. Losses @ 30 - 45 bph. 62 units maximum gas Pumping 20 bbl sweeps every 2 hours with 15 ppb Mix2 fine, 10 ppb Mix2 med & 10 ppb Safe-carb 250. Continue to Directional drill 6-3/4" hole with Geo-pilot. f 119278' to 19,367' MD 6559'TVD (89') ART 3.40 hrs. Total hrs on bit = 43.12 hrs. Total hrs on jars = 69.93 hrs, WOB 8-12k, 120 rpm's, pumping 268 gpm, 9.5 ppg mw, on bottom pressure 3130 psi, off bottom pressure 3030 psi, on bottom torque 13k ft/Ib, off bottom torque 12k ftllb, PU wt 215 k, SO wt 105 k, Rot wt 145 k. ECD 11.6 ppg. Losses @ 30 - 45 bph. 62 units maximum gas. Circulate and condition 265 gpm.= 3050 psi. MW = 9.5 ppg. Stand one stand back ea hour. Rotate pipe at 100 - 110 rpm Reciprocate while circulating. Loosing 15 BPH average while circulating Monitor well before tripping. Static with out pumping. Pfinted: 1L3U/?W5 9:34:U3 AM • ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date `From - To Hours {{Code Code Phase 111/8/2005 114:45 - 22:15 ~ 7.501 DRILL REAM I PROD 22:15 - 00:00 I 1.751 DRILL ~ CIRC PROD 111/9/2005 100:00 - 00:30 I 0.501 DRILL I OBSV I PROD 00:30 - 02:30 2.001 RIGMNTIRSRV PROD 02:30 - 03:00 0.50 DRILL OBSV PROD 03:00 - 06:00 3.00 DRILL WIPR PROD 06:00 - 12:00 I 6.001 DRILL I CIRC I PROD 12:00 - 12:30 I 0.50 I DRILL I CIRC I PROD 12:30 - 18:00 5.50 DRILL TRIP PROD 18:00 - 19:30 1.50 DRILL TRIP PROD 19:30 - 22:30 3.00 DRILL CIRC PROD 22:30 - 23:30 1.00 DRILL OBSV PROD 23:30 - 00:00 111!10!2005 100:00 - 01:00 01:00 - 01:30 01:30 - 01:45 01:45 - 05:15 0.501 DRILL (CIRC (PROD 1.001 DRILL I CIRC 1 PROD 0.501 DRILL I OBSV PROD 0.25 DRILL TRIP PROD 3.50 DRILL TRIP PROD Start: 9/11!2005 Rig Release: 11/17/2005 Rig Number: 15 Page 40 of 44 i Spud Date: 7!30/2005 End: Group: Description of Operations Circulate and back ream out of hole to shoe/ 110 rpm 270 gpm = 2780 psi. ECD's = 11.34 ppg Loosing 10 - 30 bph while back reaming. No tight hole seen. Circulate and condition at casing shoe. Pumping at 300 gpm 3100 psi rotating 110 rpm. Shakers cleaned up in one bottoms up. Loosing 20 - 30 bph to well while circulating Total fluid lost to well 3787 bbls Total fluid lost past 24 hours 616 bbls Monitor well at casing shoe. Slight breathing for 5 minutes reduced to static with no losses. 1 bbls back and static. Slip .and cut103'-drill line.. Pumping at 20 spm 780 psi while doing rig service. Lost 14 bbls to well in 2.5 hours. Monitor well fro 30 minutes /Static. Trip inhole F/14871 to 19,209' Wash and ream from 19,209 to 19367' 270 gpm = 2100 psi Circulate and condition mud @ 267 gpm = 3030 psi. PU wt 215 k, SO wt 115 k, Rot wt 145 k. ECD 11.6 ppg. Losses @ 30 - 45 bph. 110 rpm 11 K ft/# torque. Stand back 1 stand per hour F/ 19367 to 18930' Circulate and prepare for trip. Circulate and condition mud @ 267 gpm = 3030 psi. PU wt 215 k, SO wt 115 k, Rot wt 145 k. ECD 11.6 ppg. Losses @ 30 - ~ 45 bph. 110 rpm 11 K ft/# torque. i Pump out of holeF! 18368 to 15567. tried to pull on elevators but began i to swab. !Continue to pull out (pumping) of hole F/ 15567 to 14781 @ casing 'shoe. 267 gpm 2680 psi P/U weight = 210k# // S/O weight = 120K# No over pull through sidetrack 15115' or loss section @ 15889' Circulate LCM sweep to clean up well bore @ 300 gpm = 3050 psi. Rotate @ 100 RPM Monitor well for losses /gains. Breathing bath 4 bbls 30 minutes and stopped. Monitored 30 additional minutes with no losses or gains. Circulate EP mud sweep @ 300 gpm 3050 & 100 RPM Lost 411 bbl's in last 24 hours for total loss to wel of 4198 bb's Continue to circulate EP mud tube pill. 300 gpm = 3050 psi Monitor well fro well control. Breathing back 4 bbls in 30 minutes and static after / no gain no loss after 30 minutes. Pump dry job and blow down top drive. Trip out of hole From 14871 to 8865' Lotads are worn and damaged 36 stands with Lotads out, most showing wear. 3 Lotads laid down out of 36 2 x broken open but all parts intact. Hole taking correct fill while tripping out. Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Page 4~ of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1 C-28 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours Code Code Phase 11/10/2005 105:15 - 09:30 4.251 RIGMNTI RGRP I PROD 09:30 - 10:00 10:00 - 10:30 10:30 - 16:00 16:00 - 16:30 16:30 - 17:30 0.501 DRILL (TRIP (PROD 0.50 DRILL TRIP PROD 5.50 DRILL TRIP PROD 10.001 DRILL TRIP PROD 17:30 - 18:00 18:00 - 19:00 19:00 - 19:30 19:30 - 22:00 22:00 - 22:45 22:45 - 23:30 23:30 - 00:00 11/11/2005 00:00 - 00:30 ~ 00:30 - 01:00 01:00 - 01:45 01:45 - 06:00 06:00 - 12:30 12:30 - 14:30 0.50 DRILL TRIP PROD 1.00 DRILL TRIP PROD 0.50 ~ DRILL I PULD I PROD 2.50 I FISH I FISH I PROD 0.751 FISH f FISH f PROD 0.751 FISH PULD ~ PROD 0.501 FISH I TRIP I PROD 0.501 FISH I TRIP I PROD 0.50 FISH PULD PROD 0.75 FISH PULD PROD 4.25 FISH TRIP PROD 6.50 ~ FISH I TRIP PROD 2.001 FISH (TRIP PROD Spud Date: 7/30/2005 Start: 9/11/2005 End: Rig Release: 11/17/2005 Group: Rig Number: 15 Description of Operations Repair drawwork /traction motor drive chain after breaking. Hold prejob safety meeting and repair. POOH from 8865 to 7635' watching string carefully for increased drag and 1 or missing lotad pieces on string. NPT time is taken while tripping and taking extra time to attempt to locate lost Lotad body. Drain stack and look for {otad body on BOP. Nothing could be seen. POH to HWDP. Over pull seen at 1250' (40K#) Inspection super sliders as pulled. All seamed to be in good shape. Change out elevators and monitor well. (Static) Drain stack and inspect for Lotad missing pieces. Lotad piece just below wear bushing in spool. Back out. wear bushing lock downs and attempt to pull wear bushing and broken LoTad with upper stab (114' above bit). Attempt failed and dropped to lower stab. Clear rig floor and unload nukes. Tighten down lock downs on wear bushing and pull lower stab and broken lotad body in to wear bushing. Release lock down and pull wear bushing to rig floor. 1 /2 of lotad body lodged on top stab under wear bushing. second 1/2-seen laying on top 7 5/8" casing hanger. Lay down MWD equipment to al{ow handing fishing tools. Order out magnetic. 5 1/2" Magnetic arrives and checked on 112 lotad retrieved and was not strong enough to hold. Ordered out larger magnetic (8.5") While waiting on magnetic: broke down MWD tools and laid down in pipe shed. Make up 8.5" magnetic and attempt to .retrieve lotad body at top 7 5/8" casing hanger. 'Failed and piece dropped into 7 5/8" casing. 'Lay down fishing magnetic. RIH with wear ring set. Pick up Geo pilot and nuke tools from derrick and lay down into pipe shed to be read. Ready tools and equipment to make clean out run. Lost 85 BBLS to formation in last 24 hours Tota! fluid lost to well 4283 bbls. Continue to lay down MWD from derrick and down load. All data good. Clear rig floor and prepare to pick up BHA Pick up mill tooth bit and BHA (BHA #18) RIH with mill tooth bit to push junk to bottom. Fill pipe every 25stands Trip in hole F/ 6125 to 14793' String taking weight. Up = 22K# DWN = 120K# Fill Pipe 270 Gpm 1930 psi Slack off 25K# down and work by obstruction. RIH F 14793 to 19114' No more obstruction seen. Fill hole every 25 stands Printed: 12/30/2005 9:34:03 AM • • ConocoPhillips Alaska Page 42 of 44 Operations Summary Report Legal Well Name: 1 C-28 Common Well Name: 1 C-28 Spud Date: 7/30/2005 Event Name: ROT - DRILL{NG Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours Code Sub Phase Description of Operations Code 11/11/2005 14:30 - 16:00 1.50 FISH WASH PROD Wash from 19114 to 19360' 1 Stand and 5 singles, 270 GPM = 2250 psi Up weight 210K#: Down weight 110K# 16:00 - 20:45 4.75 FISH CIRC PROD Circulate and condition while working string. 270 GPM = 2250 psi Up weight 210K#: Down weight 110K# 20:45 - 23:15 2.50 FISH CIRC PROD Circulate and monitor well. Slight breathing for 15 minutes. Static after. 23:15 - 00:00 0.75 FISH CIRC PROD Pump out Lay down 1 joint HWDP, 4 jts XT 39, continue pumping out 5 stands to 18927' Daily losses for 11!11 = 174 bbl's Total losses to well 4457 bbls 11/12/2005 00:00 - 01:00 1.00 FISH TRIP. PROD _ . Pull out of hole on Elevators monitoring losses. _ Hole not swabing. No over pull. 01:00 - 01:15 0.25 FISH CIRC PROD Pump 20 bbls dry job. 01:15 - 03:15 2.00 FISH TRIP PROD Pulled to shoe on elevators slowly with out pumping out. No swabing or over pull. 03:15 - 06:00 2.75 FISH CIRC PROD Circulate at shoe at 320 GPM ! 100 rpm Hole started to take 40 - 60 BPH Reduced pump rate to 260 gpm and fosses reduced to 20 - 25 bph. 06:00 - 07:15 1.25 FISH CIRC PROD Circulate pill EP mud tube and take to rock washer. 07:15 - 07:45 0.50 FISH TRIP PROD Monitor well 30 minutes. Static 07:45 - 10:30 2.75 FISH TRIP PROD POH well slowly watch for correct fill and loss. 10:30 - 11:00 0.50 FISH CIRC PROD Pump dry job and blow down top drive. 11:00 - 19:00 8.00 FISH TRIP PROD POH from 12320 to 2170' SLM inspecting lotads and super sliders and arranging in derrick to run liner. Lay down accelerators and jars. drift pipe as pulled. Rabbit not dropping very well. 19:00 - 20:45 1.75 FISH PULD PROD Lay HWDP and BHA. 20:45 - 21:45 1.00 FISH PULD CMPLTN Clear rig floor and prepare to run liner. Make break on MWD tools and lay down. MWD tools were not in string. Picked up from pipe shed broke and laid down. 21:45 - 23:45 2.00 CASE RURD CMPLTN PJSM to run liner and prepare tools and services. 23:45 - 00:00 0.25 CASE PULR CMPLTN Pick up and run slotted and blank liner. Ran 10 joints. Total fluid loss to well in past 24 hours = 186 bbls Total fluid lost to well 4863 bbls 11!13!2005 00:00 - 04:00 4.00 CASE PULR CMPLTN Run liner to liner hanger. Well taking about 3-5 bph average. 04:00 - 05:15 1.25 CASE PULR CMPLTN Pick up liner hanger as per Baker 05:15 - 06:00 0.75 CASE RUNL CMPLTN Running liner on drill pipe. Filling every 25 stands. 06:00 - 12:30 6.50 CASE RUNL CMPLTN Run liner to casing shoe. Establish rotating, slack off and pickup weights. Pickup weight = 180K ;Slack off weight 120k Rotate @ 35 RPM = 8000 ft# torque i 12:30 - 16:00 3.50 CASE RUNL CMPLTN Run liner into open hole taking up and down weights every 5 stands. I Set down 40K @ 18650' and work through with no trouble. 16:00 - 19:00 3.00 CASE CIRC CMPLTN Drop Baker setting 1 1/2' balland pump down at 11 spm 780 psi for 1832 strokes. Printed: 12/30!2005 9:34:03 AM • ConocoPhillips Alaska Page 43 of 44 Legal Well Name: 1C-28 Operations Summary Report Common Well Name: 1 C-28 Spud Date: 7/30/2005 Event Name: ROT -DRILLING Start: 9/11/2005 End: Contractor Name: D15CM@conocophillips.com Rig Release: 11/17/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours Code Sub Phase Description of Operations Code 11/13.12005 19:00 - 19:30 0.50 CASE CIRC CMPLTN Pressure up to 1300 psi and set liner hanger. Slack off 50K down and verify set. Pressure up to 4000 psi and set packer. Bleed psi to 0. 19:30 - 20:00 0.50 CASE MIT CMPLTN Pressure up annulus to 1500 psi and test liner packer for 15 minutes. Holding. 20:00 - 21:45 ~ 1.75 ~ CASE ~ CIRC ~ CMPLTN ~ Circulate bottoms up for well control. at 300 GPM 1870 psi. 21:45 - 22:00 0.25 CASE 22:00 - 22:30 0.50 CASE 22:30 - 00:00 1.50 CASE 11/14/2005 ~ 00:00 - 09:15 ~ 9.25 ~ CASE 09:15 - 11:15 2.00 CASE 11:15 - 12:00 0.75 CASE 12:00 - 12:30 0.50 CMPL 12:30 - 14:15 1.75 CMPL 14:15 - 18:00 I 3.751 CMPL DEOT I CMPLTN ~ Monitor well /static CIRC CMPLTN Pump dry job and prepare to POH with drill pipe. Blow down top drive. RUNL CMPLTN Pull out of hole with 4" drill pipe and lay down lotads and black band pipe for inspection. Daily fluid lost to well = 94 bbls Total fluid lost to well 4977 bbls RUNL CMPLTN POH with 4" drill pipe after setting liner. Lay down LoTads and Black XT 39 band drill pipe for inspection 150 jts and 47 lotads. RUNL CMPLTN POH with drill pipe and stand back in derrick. RURD CMPLTN Lay down Baker running tools. PULD CMPLTN Clear rig floor and prepare to run completion string. RURD CMPLTN Hold PJSM to pick up completion tools and string. Pick ip tubing equipment.. Pull Wear ring. RUNT CMPLTN Run completion string 4 112" 12.6 #/ft L-80 IBT Modified as per program fro 0' to 3800'. 18:00 - 00:00 6.00 CMPLTN RUNT CMPLTN Run completion string f ! 3800' to 11600' 11/15/2005 00:00 - 02:30 2.50 GMPLTN RUNT CMPLTN RIH with 4 1/2" tuning to 14576' Tubing string set down and could not enter tie back sleeve. 10,000# set down /work string. No entry. 02:30 - 03:30 1.00 CMPLTN RUNT CMPLTN Attempt to pressure up back side to varify hook up into tie-back. Will not test. Break circulation long way. Confirm not in tie back. 03:30 - 05:00 1.50 CMPLTN RUNT .CMPLTN Turn string 180 degrees and work into top of liner top with completion string. Run joints # 473 and 474 tag up 28' in on joint#474 Pressure up back side to 500 psi and verify entry. No Go at 14600' On depth. 05:00 - 05:45 0.75 CMPLTN SOHO CMPLTN Lay down joints # 474 & 473. Space out. Pick up on 472 and put 2 x pups blow Lengths 5.80' & 2.07' Below joint 472 Pick up liner hanger and landing joint. 05:45 - 06:45 I 1.00 CMPLTN KURD CMPLTN ~ Clean rig floor. Lay down casing /completion running tools. Hold Pre job safety meeting with crew and truck driver for displacement. 06:45 - 09:00 2.25 CMPLTN CIRC GMPLTN ~ Displace well over to 9.5 PPg brine @ 7 bpm 730 psi j Pump total 650 bbls brine Printed: 12/30/2005 9:34:03 AM • ConocoPhillips Alaska Page 44 of 44 Operations Summary Report Legal Well Name: 1C-28 Common Well Name: 1C-28 Spud Date: 7/30!2005 Event Name: ROT -DRILLING Start: 9111!2005 End: Contractor Name: D15CM@conocophiifips.com Rig Release: 11!1712005 Group: Rig Name: Doyon 15 Rig Number: 15 Date :From - To Hours Code Code Phase Description of Operations 111115/2005 (09:00 - 10:15 I 1.25, CMPLTN CIRC f CMPLTN Pump 322 bbls corrosion inhibitor @ 7 bpm 600 psi. 10:15 - 11:00 0.75 CMPLTN CIRC CMPLTN Chase corrosion inhibitor with 222 bbls brine @ 7 bpm 600 psi 11:00 -11:30 0.50 CMPLTN SOHO CMPLTN Sting into SBE landing hanger. Lay down landing joint Pick up weight = 170,000# Slack off weight 115,000# 11:30 - 11:45 0.25 CMPLTN DEQT CMPLTN Test 4 112" tubing X 7 5/8" casing to 1000 psi for 5 minutes to verify seated into tie back. Good test. 11:45 - 12:15 0.50 CMPLT RURD CMPLTN Lay down landing joint and blow down top drive. 12:15 - 12:30 0.25 CMPLTN NUND CMPLTN Set BPV with FMC. 12:30 - 12:45 0.25 CMPLTN PULL CMPLTN Rig up 4"elevators to lay down drill pipe and remove super sliders. Inspect pipe visually where SS were. 12:45 - 00:00 11.25 CMPLT PULL CMPLTN Lay down 4" drill pipe from derrick and remove super slider. Marking bottom of super slider so they can be flopped over and re-ran. Number as to position in string to evaluation of condition by Security DBS. Total fluid lost to well past 24 hours = 12 bbls Total fluid lost to well 5055 bbls 11/16/2005 00:00 - 02:00 2.00 CMPLTN PULL CMPLTN Continue to lay down 4" drill pipe in mouse hole with super sliders 02:00 - 09:15 7.25 CMPLTN PULL CMPLTN Continue to lay down 4" drill pipe from derrick 09:15 - 11:00 1.75 RIGMNT RSRV CMPLTN Slip and cut drilling, Service brakes on drawworks. 11:00 - 15:15 4.25 RIGMNT RSRV CMPLTN Change out top pipe rams to 4.5 X 7" Clean out drip pan under rig floor. Change out saver sub to 4 1!2" IF. Change out liners on pumps to 6". 15:15 - 21:00 5.75 CMPLTN NUND CMPLTN Blow down choke and kill lines. Nipple down BOP. Also continue to change out liners on mud pumps. 21:00 - 21:45 0.75 CMPLTN NUND CMPLTN Continue to nipple down BOP removing riser and well head. 21:45 - 23:30 1.75 CMPLTN NUND CMPLTN Nipple up tree. Test void to 5000 psi. Good test. 23:30 - 00:00 ~ 0.50 ~ CMPLTN SEAT ~ CMPLTN ~ Rig up drill site maintenance with lubricator to pull BPV 11/17/2005 00:00 - 02:00 2.00 CMPLTN SEAT CMPLTN Rig up lubricator with Drill site maintenance. 02:00 - 02:30 0.50 CMPLT SEAT CMPLTN Test tree to 5000 psi good test. 02:30 - 03:00 0.50 CMPLTN SEAT CMPLTN Pull TWC with drill site maintenance and lubricator 03:00 - 03:30 0.50 CMPLTN SEAT CMPLTN Perform MITIA to 7 5/8" casing & 4 1/2' tubing to 2500 psi. j Brought pressure up slowly to 2500 psi. RP valve sheared at 2400 psi 03:30 - 04:00 ~ 0.50 ~ CMPLTN FRZP ~ CMPLTN ~ Freeze protect well with 83 bbls diesel pumped down back side between 7 5/8" csg & 4 1/2" tubing. 04:00 - 05:00 1.00 CMPLTN FRZP CMPLTN U tube well to tubing. 05:00 - 06:00 1.00 CMPLTN NUND CMPLTN Rig down U tube manifold and lines. 06:00 - 08:30 2.50 CMPLTN SFTY CMPLTN Waiting on drill site maintenance to set SPV. Wells group safety mgr. came to inspect operation before valve shop could continue and set BPV with lunicator. 08:30 - 09:00 0.50 CMPLTN NUND CMPLTN Set BPV and secure tree. 09:00 - 12:00 3.00 CMPLTN, FRZP CMPLTN Secure well and relaease rig at 12:00 (noon) Printed: 12/3012005 9:34:03 AM • • 11-Jan-06 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINII"IVE Re: Distribution of Survey Data for Well 1 C-28 L1 a OS- 17 3 Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: 13,384.05' MD Window /Kickoff Survey: 13,400.00' MD (if applicable) Projected Survey: 15,378.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Date Signed Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) Halliburton Sperry-Sun Western North Slope ConocoPhillips Kuparuk 1 C 1 C-28L 1 Job No. AK ZZ-0003922104, Surveyed: 28 October, 2005 Survey Report 8 December, 2005 Your Ref: API 500292327060 Surtace Coordinates: 5968689.43 N, 562121.21 E (70° 19' 29.9481 " N, 149° 29' 46,5750" UIQ Grid Coordinate System: NAD27A/aska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 968689.43 N, 62121.21E (Grid) Surface Coordinates re/ative to Stucture Reference: 169.04 N, 249.45 W (True) Kelly Bushing Elevation: 100.90ft above Mean Sea Level Kelly Bushing Elevation: 100.90ff above Project V Reference Kelly Bushing Elevation: 100.90ft above Structure Reference 1""~t"~1~--l~JC'1 r Survey Ref.• svy2226 A HstN@burton ~ompamy Halliburton Sperry-Sun Survey Report for Kuparuk 1 C -1 C-28L 1 Your Ref.• AP/ 500292327060 Job No. AK ZZ-0003922104, Surveyed: 28 October, 2005 Western North Slope Measured True Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) 1ft) (ft) 13384.05 72.360 109.850 5911.24 6012.14 - 13400.00 71.880 110.340 5916.14 6017.04 .. 13426.36 71.090 111.160 5924.51 6025.41 13477.99 67.660 110.520 5942.70 6043.60 13527.38 65.630 111.130 5962.28 6063.18 13568.56 65.770 110.820 5979.22 6080.12 13662.77 64.630 108.360 6018.74 6119.64 13755.23 64.880 106.100 6058.18 6159.08 13852.84 66.380 107.390 6098.46 6199.36 13948.92 66.310 106.940 6137.01 6237.91 Local Coordinates Northings Eastings (ft) (ft) 3623.07 S 10451.54 E 3628.29 S 10465.80 E 3637.14 S 10489.17 E 3654.33 S 10534.32 E 3670.45 S 10576.70 E Global Coordinates Northings Eastings lft) (ft) 5965153.00 N 572602.39 E 5965147.91 N 572616.69 E 5965139.24 N 572640.13 E 5965122.43 N 572685.43 E 5965106.66 N 572727.94 E Dogleg Vertical Rate Section (°/100ft) ConocoPhillips Comment 10482.76 Tie-On Point 4.196 10497.06 Sidetrack Point 4.205 10520.51 6.744 10565.81 4.264 10608.33 3683.89 S 10611.75E 5965093.52 N 572763.09E 0.766 10643.49 3712.56 S 10692,31E 5965065.51 N 572843.88E 2.661 10724.30 3737.33 S 10772.18E 5965041.40 N 572923.96E 2.227 10804.38 3762.95 S 10857.31E 5965016.49 N 573009.30E 1.952 10889.74 3788.93 S 10941.40E 5964991.21 N 573093.60E 0.435 10974.05 14043.82 65.590 106.240 6175.68 6276.58 3813.67 S 11024.45E 5964967.15 N 573176.86E 1.015 11057.31 14139.11 64.550 108.010 6215.85 6316.75 3839.11 S 11107.03E 5964942.40 N 573259.64E 2.007 11140.11 14234.46 65.220 107.210 6256.32 6357.22 3865.23 S 11189.32E 5964916.97 N 573342.14E 1.035 11222.62 14329.37 67.580 106.370 6294.31 6395.21 3890.34 S 11272.58E 5964892.54 N 573425.61E 2.615 11306.10 14423.50 71.520 106.640 6327.20 6428.10 3915.40 5 11357.12E 5964868.19 N 573510.36E 4.194 11390.86 14519.52 73.790 104.470 6355.82 6456.72 3939.96 S 11445.41E 5964844.35 N 573598.84E 3.200 11479.36 14614.31 77.700 104.850 6379.16 6480.06 3963.21 S 11534.27E 5964821.84 N 573687.90E 4.143 11568.42 14709.40 80.730 102.190 6396.95 6497.85 3985.03 S 11625.08E 5964800.77 N 573778.88E 4.207 11659.41 14761.70 82.660 100.050 6404.51 6505.41 3995.01 S 11675.$5 E 5964791.21 N 573829.73E 5.478 11710.27 14845.56 86.810 99.480 6412.20 6513.10 4009.17 S 11758.13E 5964777.74 N 573912.13E 4.995 11792.67 14875.63 87.060 99.790 6413.81 6514.71 4014.20 S 11787.73E 5964772.96 N 573941.77E 1.323 11822.31 14927.59 88.540 101.230 6415.81 6516.71 4023.67 S 11838.78E 5964763.91 N 573992.90E 3.973 11873.44 14968.09 87.920 103.410 6417.06 6517.96 4032.30 S 11878.33E 5964755.60 N 574032.51E 5.594 11913.06 15059.07 88.850 106.930 6419.62 6520.52 4056.10 S 11966.09E 5964732.53 N 574120.47E 4.000 12001.03 15108.29 92.060 105.630 6419.23 6520.13 4069.89 S 12013.32E 5964719.13 N 574167.82E 7.036 12048.38 15154.68 94.530 104.070 6416.56 6517.46 4081.76 S 12058.09E 5964707.63 N 15248.97 92.860 103.860 6410.49 6511.39 4104.47 S 12149.40E 5964685.68 N 15287.92 93.780 103.800 6408.23 6509.13 4113.76 S 12187.15E 5964676.70 N 15339.32 95.330 103.330 6404.15 6505.05 4125.78 S 12236.96E 5964665.09 N 15378.00 95.330 103.330 6400.56 6501.46 - 4134.66 S 12274.43E ' 5964656.52 N All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 90.500° (True). 574212.67E 6.294 12093.25 574304.17E 1.785 12184.75 574342.00E 2.367 12222.59 574391.90E 3.150 12272.50 574429.45E • 0.000 12310.05 Projected Survey r 1 ~J 8 December, 2005 - 9:26 Page 2 of 3 DrillQuest 3.03.06.008 Ha/liburton Sperry-Sun Survey Report forKuparuk 1C-1C-28L1 Your Ref.• AP/ 500292327060 Job No. AK-ZZ-0003922104, Surveyed: 28 October, 2005 Western North Slope Based upon Minimum Curvature type calculations, at a Measured Depth of 15378.OOft., The Bottom Hole Displacement is 12952.11ft., in the Direction of 108.616° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 13384.05 6012.14 3623.07 S 10451.54E Tie-On Point 13400.00 6017.04 3628.29 S 10465.80E Sidetrack Point 15378.00 6501.46 4134.66 S 12274.43E Projected Survey Survey tool program for 1 C-28L1 From Measured Vertical Depth Depth (ft) (ft) 0.00 0.00 924.50 920.60 To Measured Vertical Depth Depth (ft) (ft) 924.50 920.60 15378.00 6501.46 Survey Tool Description CB-SS-Gyro (1C-28P61) MWD+IIFR+MS+SAG (1C-28P61) ConocoPhillips • 8 December, 2005 - 9:26 Page 3 of 3 DrillQuest 3.03.06.008 ~~,.g/•i mil" ~'~~~ Sag/~ crnLQ~S 9 Qr,~'~ 1 v°7--~r 1 ~~ Zzs Qur, S1/ S/ so ~/ -/i •~~ -~,,... f~is- Qw So~'S l ~ g~ d~rs, ~is~ 'ou•, ~'s~ .s ~~ Q~ Zoz ~sr f . ~ sa•/~•v~ P.t.d.L/4 ~' SvS~ •o/ ~ -~t-~~s ~ ,Z'L2vl- ~ _ ~,,~~/ ~yt QZ! ~~. ~/ ~'L/- Svc ~ 4, ~~ 7~-~l'N `~ % - ~ ~ ~~~-~/ So.~ • Q/ dwr~.8%/ ~~~ L '~ °~ ~ ~ ~ FRANK H. MURKOWSK/, GOVERNOR ~7~ OIL ~ Vrt>•-7 333 W. T" AVENUE, SUITE 100 COI~TSER~ATI011j COAIMISSIOIQ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 Randy Thomas FAX (so7~ 27s-75x2 Greater Kuparuk Area Drilling Team Leader ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Re: KRU 1C-28L1 ConocoPhillips Alaska, Inc. Permit No: 205-173 Surface Location: 1549' FNL, 1114' FWL, Sec. 12, T11N, R10E, UM Bottomhole Location: 413' FNL, 2103' FEL, Sec. 17, T 11 N, R 11 E, UM Dear Mr. Thomas: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. The permit is for a new wellbore segment of existing well KRU 1C-28, Permit No. 205- 104, API 50-029-23270-00. Production should continue to be reported as a function of the original API number stated above. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 {pager DATED this/J day of November, 2005 cc: Department of Fish 8a Game, Habitat Section w/ o encl. _ Department of Environmental Conservation w/o encl. • ConocoPhillips November 4, 2005 Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7'h Avenue Suite 100 Anchorage, Alaska 99501 Subject: Permit to Drill for 1 C-28L1 Dear Commissioner: Randy Thomas Kuparuk Drilling Team Leader Drilling & Wells P. O. Box 100360 Anchorage, AK 99510-0360 Phone: 907-265-6830 --~'. ConocoPhillips Alaska, Inc. submits the attached Permit to Drill for the unplanned -~~~~r~~ - p~for 1 C-28 as per recent email communications with Tom Maunder and r`s ~~ ~~ ~ Steve Davies. The original 1 C-28 permit to drill application was approved on f3s-- 7/11/05 (205-104). All original attachments apply to this plugback. . ;r t~ _ .-~ js..~=~-w / ~ ~~~ ~ ~ ~~ ~'~s Attached are the as-drilled preliminary directional surveys for the plugback which reached a TD of 15,378' MD on 10/28/05. The well was sidetracked at 15,114' on 1111105 to continue drilling to the original permitted planned depth. Also attached are drawings describing the plugback's relationship with the final planned 1C-28 wellbore that is in progress and will eventually be cased with a 4-1/2" slotted liner. If you have any questions regarding this matter, please contact me at 265-6830 or Tim Billingsley at 265-6531. Sincerely, .:.y`, ~ R. Thomas Kuparuk Drilling Team Leader CPAI Drilling RT/skad STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 F t ~~1 •; 1a. Type of Work: Drill / Redrill Re-entry ^ 1b. Current Well Class: Exploratory Development Oil / Multiple Zone ^ Stratigraphic Test ^ Service ^ Development Gas ^ Single Zone Q 2. Operator Name: ConocoPhillipsAlaska, Inc. 5. Bond: / Blanket Single Well Bond No. 59-52-180 11. Well Name and Number: 1C-28L1 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 6. Proposed Depth: MD: 15378' ` TVD: 6501' ~ 12. FieldlPool(s): Kuparuk River Field 4a. Location of Well (Governmental Section): Surface: 1549' FNL, 1114' FWL, Sec. 12, T11 N, R10E, UM ~ 7. Property Designation: ADL 25649,,28242, 28243 ~ Kuparuk Oil Pool Top of Productive Horizon: 275' FNL, 2682' FEL, Sec. 17, T11 N, R11 E, UM 8. Land Use Permit: ALK 2292, 3814 13. Approximate Spud Date: 9!18!2005 Total Depth: 413' FNL, 2103' FEL, Sec. 17, T11 N, R11 E, UM 9. Acres in Property; 1920 14. Distance to ~,; ~ ~ L~ Nearest Property: fiA~"from KRU Bndr) // ! °~f- 4b. Location of We{I (State Base Plane Coordinates): Surface: x- 562121 y- 5968688 ~ Zone- 4 10. KB Elevation (Height above GL): 4Q' RKB feet 15. Distance to Nearest well within Pool: 1C-21 @ , 799' 16. Deviated wells: Kickoff depth: _ ft. h, i< ` T°d~ c5 Maximum Hole Angle: ' 9~5° rr deg 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3219 psig - Surface: 2497 psig 18. Casing Program if ati n S Setting Depth Quantity of Cement Size ic pec o s Top Bottom c. f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (inGuding stage data) 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations) Total Depth MD (ft): 15378' Total Depth TVD (ft): 6501' Plugs (measured) Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured) Casing Length Size Cement Volume MD ND Structural Conductor 76' 16" 9 cu yds High Early 116' 116' Surface 9221' 10.75" 859 bbls ASlite, 230 bbls LtCrete 9221' 4512' Intermediate 14781' 7.625" 5s bbls Class G 14781' 6508' Production Liner Pertoration Depth MD (ft): none Perforation Depth TVD (ft): 20. Attachments: Filing Fee ^ BOP Sketch Drilling Program Time v. Depth Plot Shallow Hazard Analysis Property Plat ^ Diverter Sketch ^ Seabed Report ^ Drilling Fluid Program ^ 20 AAC 25.050 requirements ^ 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Tim Billingsley @ 265-6531 Printed Name Randy Thomas Title Greater Kuparuk Area Drilling Team Leader Signature li `~_ ~~~ Phone Z.G S'G$ so Date C t /`rf~S AI Commission Use Only Permit to Drill _ Number: ~~ ~' ~ ~ ~ API Number: 50- O Z, l ' Z,'?~ Z70 ~ Permit Approval Date: ~l. See cover letter for other requirements Conditions of approval S pl s required Yes ^ No ~ Mud log required Yes ^ No ydro en sulfide measures Yes ~ No ^ Directional survey required Yes ~ No ^ Other: ~ ~-1~~~ ~ fi C~`ti.+ ~~V ~~'C i~~cY~'`C~~ , l APPROVED BY / `! ~~i Appr THE COMMISSION Date: f Form 10-401 Revised 0612004 ~ ~ ~ ~ ~ ~ L Submit in Duplicate ~v z D r C_ 0 ITD of 1C-28 L1 is 15378' MDI - v v h~ ~` 1 C-28 L ~g $ ~ ~ ~ ~ ~ m '~ $ ~° ,~ ' 1 C-28 N ~ _ Current Depth 1 C-28 is 16000' M Sidetrack Point to 1 C-28 @ 13114' M with planned TD @ approximately 18870' MD • 11000 11125 11250 11375 11500 11625 11750 11875 12000 12125 12250 12375 12500 12625 12750 12875 13000 13125 13250 13375 13500 Vertical Section at 90.50° (250 tUn) HALLIBURTON EpKry Dr1lllnq 3er•lo~s ~alliburton Com any A Global Report I Company: ConocoPhillips Alaska Inc. Field: Kuparuk River Unit Site: Kuparuk 1C Pad ~'t'cII: PIan:1C-28 1i'ellpath; 1C-28L1 Rig Survey: Company: Tool: __ - __ -- Date. 11/3/2005 Pime: 14'36:05 Page: i Co-ordinate(1L+'+') Reference: Well: Plan: 1C-28, True North "•'ertical ('1'VD) Rcfercuce: 1C-28L1Rig: 100.6 Section (b'S) Reference: Well (O.OON,O.OOE,9Q50Azi) Suitie~ Calcul-tion Method: Minimum Gurvature ~ Db: Oracle~~ Start Date: Engineer: 'Pied-to: Field: Kuparuk River Unit North Slope Alaska United States Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005 Site: Kuparuk 1 C Pad Site Position: Northing: 5968522.46 ft Latitude: 70 19 28.285 N From: Map Easting: 562372.05 ft Longitude: 149 29 39.293 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 0.48 deg _ J -, Well: PIan:1C-28 Slot Name: Well Position: +N/-S 169.07 fit Northing: 5968689.43 ft `Latitude: 70 19 29.948 N +E/-W -249.47 ft Easting : 562121.21 ft Longitude: 149 29 46.575 W Position Uncertainty: 0.00 ft Wellpath: 1C-28L1 Rig Drilled From: 1C-28PB1 Rig Tie-on Depth: 13384.05 ft Current Datum: 1C-28L1Rig: H eight 100.60 ft Above System Datum: Mean Sea Level Magnetic Data: 11/3/2005 Declination: l 24.33 deg 81 deg 80 Field Strength: 57568 nT e: Mag Dip Ang . Vertical Section: Depth From (TVD) +NI-S +EI-W Direction i ft ft ft deg _._. 40 .00 0.00 0.00 90.50 - - -__ Survey Program for De£-nitive Wellpath -~ i Date: 11/3/2005 Validated: No Version: 1 Actual From To Survey Tooicode Tooi Name ~~ ft ft 00 00 731 119 1C-28P61 rig gyro (119. 00-731. CB-GYRO-SS Camera based gyro single shot . . 05 50 13384 826 1C-28P61 rig (826.50-15168.02) MWD+IFR-AK-CAZ- SCMWD+IFR AK CAZ SCC . . 13400.00 15339.32 Survey #1 {13 400.00-15 339.32) MWD+IFR-AK-CAZ- SCMWD+IFR AK CAZ SCC Survey _ -- - "' ~ MD Jncl ~ Azim 1'~'D Sys'f~~D tAIS F:/~Y )VIapN Ntapl[. oo ~ ft deg deg ft ft ft ft ft ft _~ ,_ _------+ --- _ 40.00 0.00 - - 0.00 40.00 -60.60 0.00 0.00 11 5968689.43 ~ 562121.21 , 33 18 562121 5968689 TIE LINE CB-GYRO-SS 119.00 0.40 155.60 119.00 00 175 18.40 40 74 -0.25 0. 79 0.50 -0 . . 5968688.65 562121.72 CB-GYRO-SS 175.00 0.96 05 00 1 260 139.53 76 123 . 259.98 . 159.38 . -1.76 1.61 5968687.68 562122.83 CB-GYRO-SS . . 360.00 2.56 . 114.31 359.93 259.33 -3.19 4.41 5968686.28 562125.64 CB-GYRO-SS 455.00 3.85 111.34 454.78 354.18 -5.22 9.31 5968684.28 562130.56 69 562136 CB-GYRO-SS CB-GYRO-SS i 545.00 4.49 110.67 544.54 443.94 -7.57 15.42 46 23 . 5968681.99 19 562144.75 5968679 CB-GYRO-SS 640.00 5.82 108.82 639.15 538.55 87 628 . -10.43 11 41 34 -13 . 5968676.31 562155.42 CB-GYRO-SS 731.00 8.15 103.32 10 101 729.47 90 823 . 30 723 . . -16.42 48.07 5968673.41 562169.41 MWD+IFR-AK-CAZ-SC 826.50 9.06 . . . 50 9.62 924 100.39 920.60 820.00 -19.38 63.70 5968670.58 562185.06 MWD+IFR-AK-CAZ-SC '~I AK-CAZ-SC MWD+IFR . 954.30 10.50 99.98 949.94 849.34 -20.30 68.82 72 89 5968669.71 562190.19 57 562211.12 5968665 - MWD+fFR-AK-CAZ-SC 'i 1050.67 15.10 102.81 1043.89 943.29 90 1034 . -24.60 63 54 116 -30 . 5968659.86 562238.08 MWD+IFR-AK-CAZ-SC 1146.35 18.38 102.13 65 1135.50 87 1226 . 27 1126 . . 95 145.82 -36 5968653.69 562267.32 MWD+IFR-AK CAZ-SC 1242.48 17.85 102. . . . 24 19.03 1338 106.75 1317.71 1217.11 -44.66 175.09 5968646.22 562296.65 MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC . 1431.11 23.51 111.27 1404.24 1303.64 -55.75 206.87 5968635.40 562328.52 - ORIGINNL ' ~alliburton Company Global Report C'ompan~°: ConocoPhillips Alaska Inc. t'ietd: Kuparuk River U nit '~ Site: Kuparuk 1C Pad 1~'ell: PIan :1C-28 ~~ Weltpath: 1C-28L1 Rig Sun~c~~ - - !b1D Intl Azim ft deg deg 1526.52 _-_. 27.01 ___. 112.17 1621.51 29.31 112.92 1716.91 31.28 115.06 1813.14 35.32 115.24 1908.24 38.25 114.71 2002.50 40.62 115.93 2097.89 43.93 114.90 2193.21 47.27 113.57 2288.13 48.78 112.20 2383.69 51.68 111.29 2479.43 57.28 110.86 2570.63 61.79 111.57 2668.73 68.71 111.30 Date: 11/3/2005 Time: 14:36:05 Pa~c: ~2` Co-ordinate(tiE) Rci-ereuce: Well: Plan: 1C-2$ True North Vertical (T1'll) Reference-. 1C-28L1Rig~. 100.6 Section (YS) Reference: Well (O.OON,O.OOE,90.50Azi) Surve~~ Calculation !1'[ethod: Minimum Curvature Db: Oracle TVD ft 1490.5 1574.2 1656.6 1737.0 1813.2 1885.9 1956.5 2023.2 2086. 2147. 2203. 2249. 2290. 2763.85 70.72 111. 05 2323. 2858.99 70.36 110. 09 2355. 2954.28 70.55 110. 26 2387. 3049.96 70.21 110. 20 2419. 3144.74 69.53 108. 25 2452. 3219.29 66.29 109. 88 2480. 3333.38 65.78 110. 72 2526. 3428.08 68.78 111. 82 2562. 3523.48 67.47 111. 67 2598. 3618.99 67.56 111. 81 2635. 3713.88 70.64 112. 65 2668. 3809.24 68.67 112. 09 2702. 3903.81 68.98 112. 82 2736. 3999.11 69.32 112. 63 2770.1 4094.63 70.42 111. 02 2803. 4189.64 69.80 109. 76 2835. 4284.47 68.40 108. 93 2869. 4379.68 68.00 107. 65 2904. 4475.26 69.72 107. 52 2938. 4568.68 71.65 107. 00 2969. 4662.62 72.39 106. 30 2998. 4758.87 69.96 106. 74 3029. 4854.02 70.04 107. 49 3062. 4950.27 68.79 107, 79 3096. 5047.02 70.56 107 ,48 3129. 5141. 58 71. 95 106 .90 3160. 5237. 11 71. 43 107 .24 3190. 5332. 95 70. 62 107 .47 3221. 5428 .29 69. 65 107 .72 3253. 5523. 38 71. 71 108 .74 3285. 5617 .64 71. 37 109 .52 3315. 5713 .20 71. 41 109 .62 3345. 5808 .19 70. 89 110 .98 3376. 5903 .34 70. 39 111 .18 3407. 5999 .05 70. 96 111 .23 3439. 6093 .43 70. 72 111 .36 3470. 6193 .71 71. 23 111 .13 3503: 6289 .55 70. 30 110 .96 3534. 6384 .74 69. 26 110 .64 3567. 6479 .83 70. 02 110 .18 3600. ft ft ft 2 1389.92 -70.84 244.68 6 1473.66 -88.03 286.08 3 1556.03 -107.62 330.02 4 1636.44 -130.07 377.84 0 1712.60 -154.11 429.46 9 1785.39 -179.72 483.57 7 1855.97 -207.24 541.52 5 1922.65 -235.17 603.62 73 1986.13 -262.60 668.63 86 2047.26 -289.80 736.85 46 2102.86 -317.80 809.54 69 2149.09 -346.25 882.79 73 2190.13 -378.78 965.67 71 2223.11 -411.01 1048.87 41 2254.81 -442.52 1132.85 28 2286.68 -473.49 1217.14 41 2318.81 -504.66 1301.70 03 2351.43 -533.96 1385.73 07 2379.47 -556.51 1451.01 41 2425.81 -592.68 1548.78 98 2462.38 -624.37 1630.17 52 2497.92 -657.17 1712.40 05 2534.45 -689.86 1794.37 90 2568.30 -723.40 1876.42 05 2601.45 -757.43 1959.09 21 2635.61 -791.11 2040.59 3 2669.53 -825.51 2122.74 01 2702.41 -858.85 2205.99 33 2734.73 -889.98 2289.73 16 2768.56 -919.33 2373.32 52 2803.92 -947.07 2457.25 99 2838.39 -974.00 2542.23 89 2869.29 -1000.16 2626.42 88 2898.28 -1025.76 2712.02 94 2929.34 -1051.66 2799.36 48 2961.88 -1077.97 2884.81 32 2995.72 -1105.27 2970.67 93 3029.33 -1132.75 3057.13 32 3059.72 -1159.22 3142.68 33 3089.73 -1185.84 3229.37 49 3120.89 -1212.87 3315.88 89 3153.29 -1239.98 3401.35 35 3184.75 -1268.05 3486.57 19 3214.59 -1297.35 3571.05 69 3245.09 -1327.69 3656.38 38 3275.78 -1358.87 3740.69 92 3307.32 -1391.16 3824.45 60 3339.00 -1423.83 3908.65 57 3369.97 -1456.20 3991.72 26 3402.66 -1490.56 4080.08 83 3434.23 -1523.05 4164.53 73 3467.13 -1554.77 4248.03 82 3500.22 -1585.86 4331.58 ~IapN - JIapE --- -- -_ Tool ft ft 5968620.63 562366.44 MWD+IFR-AK-CAZ-SC 5968603.78 562407.98 MWD+IFR-AK-CAZ-SC 5968584.56 562452.08 MWD+IFR-AK-CAZ SC 5968562..50 562500.07 MWD+IFR-AK-CAZ-SC 5968538.90 562551.89 MWD+IFR-AK-CAZ-SC i 5968513.73 562606.20 MWD+IFR-AK-CAZ-SC 5968486.70 562664.38 MWD+IFR-AK-CAZ-SC 5968459.29 562726.70 MWD+IFR-AK-CAZ-SC 5968432.40 562791.93 MWD+IFR-AK-CAZ-SC 5968405.77 562860.36 MWD+IFR-AK-CAZ-SC 5968378.37 562933.27 MWD+IFR-AK-CAZ-SC 5968350.53 563006.76 MWD+IFR-AK-CAZ-SG 5968318.69 563089.89 MWD+IFR-AK-CAZ-SC ' 5968287.16 563173.34 MWD+IFR-AK-CAZ-SC I 5968256.34 563257.58 MWD+IFR-AK-CAZ-SC 5968226.07 563342.11 MWD+IFR-AK-CAZ-SC ', 5968195.61 563426.92 MWD+IFR-AK-CAZ-SC ', 5968167.01 563511.18 MWD+IFR-AK-CAZ-SC 5968145.00 563576.63 MWD+IFR-AK-CAZ-SC 5968109.65 563674.70 MWD+IFR-AK-CAZ-SC 5968078.63 563756.34 MWD+IFR-AK-CAZ-SC I 5968046.52 563838.83 MWD+IFR-AK-CAZ-SC ' 5968014.52 563921.06 MWD+IFR-AK-CAZ-SC 5967981.66 564003.37 MWD+IFR-AK-CAZ-SC 5967948.32 564086.32 MWD+IFR-AK-CAZ-SC 5967915.32 564168.09 MWD+IFR-AK-CAZ-SC 5967881.60 564250:51 MWD+IFR-AK-CAZ-SC 5967848.95 564334.02 MWD+IFR-AK-CAZ-SC 5967818.52 564418.01 MWD+IFR-AK-CAZ-SC !, 5967789.87 564501.83 MWD+IFR-AK-CAZ-SC 5967762.82 564585.98 MWD+IFR-AK-CAZ-SC '' 5967736.60 564671.17 MWD+IFR-AK-CAZ-SC 5967711.15 564755.56 MWD+IFR-AK-CAZ-SC I~ 5967686.26 564841.37 MWD+IFR-AK-CAZ-SC I 5967661.08 564928.91 MWD+IFR-AK-CAZ-SC ' 5967635.48 565014.57 MWD+IFR-AK-CAZ SC 5967608.89 565100.65 MWD+IFR-AK-CAZ-SC 5967582.13 565187.32 MWD+IFR-AK-GAZ-SC i 5967556.38 565273.07 MWD+IFR-AK-CAZ-SC ; 5967530.48 565359.98 MWD+IFR-AK-CAZ-SC 5967504.16 565446.70 MWD+IFR-AK-CAZ-SC 5967477.77 565532.38 MWD+IFR-AK-CAZ-SC 5967450.40 565617.83 MWD+IFR-AK-GAZ-SC 5967421.81 565702.53 MWD+IFR-AK-CAZ-SC 5967392.18 565788.10 MWD+IFR-AK-CAZ-SC 5967361.70 565872.66 MWD+IFR-AK-CAZ-SC I 5967330.11 565956.68 MWD+IFR-AK-CAZ-SC ', 5967298.14 566041.14 MWD+IFR-AK-CAZ-SC 5967266.46 566124.46 MWD+IFR-AK-CAZ-SC 5967232.84 566213.09 MWD+IFR-AK-CAZ-SC 5967201.05 566297.80 MWD+IFR-AK-CAZ-SC '' 5967170.03 566381.56 MWD+IFR-AK-CAZ-SC 5967139.63 566465.36 MWD+IFR-AK-CAZ-SC ~alliburton Company Global Report Compan~~: ConocoPhillips Alaska Inc. Date: 1113!2005 "Time: 14.36.05 Page: 3 Field: Kuparuk River Unit Co-ordinate('V'E) Reference: Well: Pian 1C-28,True North Sire: Kuparuk 1C Pad Vertical (T~'D) Reference: 1C-28L1Rig: 100.6 ~~~cll: Plan. 1C-28 Section (VS) Reference: Well (O.OON,O.OOE,90.50Azi) ~Vellpath: 1C-28L1 Rig Surrey Calculation Method: Minimum Curvature Dh: rJracle tiurrer 11D Intl ~zun 1'VD Srs T~'D \S F./W 111ap'V MapE Tool ft deg deg ft ft ft ft ft ft ,~ 6574.88 70.47 110.68 3632.94 3532.34 -1617.09 4415.41 5967109.10 566549.43 MWD+IFR-AK-CAZ-SC 6670.41 69.93 108.74 3665.31 3564.71 -1647.40 4500.02 5967079.49 566634.28 MWD+IFR-AK-CAZ-SC 6765.89 70.20 107.56 3697.86 3597.26 -1675.36 4585.31 5967052.25 566719.79 MWD+IFR-AK-CAZ-SC 'I 6861.20 70.04 107.82 3730.27 3629.67 -1702.59 4670.70 5967025.72 566805.40 MWD+IFR-AK-CAZ-SC 6956.94 70.33 107.79 3762.73 3662.13 -1730.14 4756.46 5966998,89 566891.37 MWD+IFR-AK-CAZ-SC ~ 7052.28 71.15 108.49 3794.17 3693.57 -1758.16 4841.99 5966971.58 566977.12 MWD+IFR-AK-CAZ-SC 7145.48 71.04 107.85 3824.37 3723.77 -1785.65 4925.76 5966944.78 567061.12 MWD+IFR-AK-CAZ-SC 7241.73 71.40 108.12 3855.36 3754.76 -1813.79 5012.44 5966917.37 567148.01 MWD+IFR-AK-CAZ-SC 7336.78 70.10 107.73 3886.69 3786.09 -1841.41 5097.81 5966890.46 567233.60 MWD+IFR-AK-CAZ-SC I 7431.81 69.29 107.52 3919.67 3819.07 -1868.40 5182.75 5966864.18 567318.76 MWD+IFR-AK-CAZ-SC 7526.00 72.44 109.23 3950.54 3849.94 -1896.45 5267.18 5966836.82 567403.41 MWD+IFR-AK-CAZ-SC I 7621.80 72.44 109.05 3979.45 3878.85 -1926.40 5353.47 5966807.59 567489.93 MWD+IFR-AK-CAZ-SC 7716.59 71.85 110.40 4008.51 3907.91 -1956.85 5438.40 5966777.85 567575.10 MWD+IFR-AK-CAZ-SC 7811.65 72.06 109.25 4037.96 3937.36 -1987.50 5523.43 5966747.91 567660.37 MWD+IFR-AK-CAZ-SC 7907.15 71.06 110.74 4068.17 3967.57 -2018.48 5608.56 5966717.64 567745.75 MWD+IFR-AK-CAZ-SC 8002.80 71.20 110.41 4099.10 3998.50 -2050.28 5693.29 5966686.54 567830.74 MWD+IFR-AK-CAZ-SC 8097.58 71.99 110.81 4129.03 4028.43 -2081.94 5777.47 5966655.58 567915.16 MWD+IFR-AK-CAZ-SC '~ 8192.42 70.03 109.82 4159.89 4059.29 -2113.08 5861.56 5966625.15 567999.50 MWD+IFR-AK-CAZ-SC 8286.39 70.10 109.95 4191.93 4091.33 -2143.12 5944.63 5966595.79 568082.81 MWD+IFR-AK-CAZ-SC 8381.70 70.23 110.24 4224.27 4123.67 -2173.93 6028.83 5966565.69 568167.25 MWD+IFR-AK-CAZ-SC ', 8477.19 70.09 110.12 4256.68 4156.08 -2204.91 6113.14 5966535.41 568251.81 MWD+IFR-AK-CAZ-SC I, 8570.85 71.03 110.60 4287.85 4187.25 -2235.64 6195.94 5966505.37 568334.85 MWD+IFR-AK-CAZ-SC 8666.74 70.16 109.35 4319.71 4219.11 -2266.54 6280.94 5966475.18 568420.10 MWD+IFR-AK-CAZ-SC 8762.10 68.86 109.13 4353.09 4252.49 -2295.98 6365.28 5966446.44 568504.66 MWD+IFR-AK-CAZ-SC 8857.00 69.94 109.79 4386.48 4285.88 -2325.57 6449.03 5966417.54 568588.65 MWD+IFR-AK-CAZ-SC 8951.81 71.30 109.58 4417.94 4317.34 -2355.70 6533.24 5966388.12 568673.10 MWD+IFR-AK-CAZ-SC I' 9047.07 69.52 109.94 4449.88 4349.28 -2386.04 6617.70 5966358.48 568757.80 MWD+IFR-AK-CAZ-SC 9142.22 68.50 108.52 4483.96 4383.36 -2415.30 6701.57 5966329.92 568841.91 MWD+IFR-AK-CAZ-SC ', 9185.30 68.98 109.56 4499.58 4398.98 -2428.39 6739.52 5966317.14 568879.96 MWD+IFR-AK-CAZ-SC 9316.75 69.05 109.09 4546.66 4446.06 -2469.01 6855.34 5966277.49 568996.10 MWD+IFR-AK-CAZ-SC ', 9410.88 70.77 107.25 4578.99 4478.39 -2496.57 6939.33 5966250.63 569080.30 MWD+IFR-AK-CAZ-SC 9504.63 70.24 106.55 4610.28 4509.68 -2522.26 7023.89 5966225.64 569165.06 MWD+IFR-AK-CAZ-SC 9598.68 68.55 108.54 4643.38 4542.78 -2548.79 7107.82 5966199.81 569249.20 MWD+IFR-AK-CAZ-SC 9693.94 67.61 106.97 4678.94 4578.34 -2575.74 7191.98 5966173.56 569333.57 MWD+IFR-AK-CAZ-SC 9788.46 66.94 107.51 4715.46 4614.86 -2601.58 7275.24 5966148.42 569417.04 MWD+IFR-AK-CAZ-SC 9883.82 68.57 109.36 4751.56 4650.96 -2629.49 7358.96 5966121.20 569500.99 MWD+IFR-AK-CAZ-SC ! 9979.18 69.62 110.78 4785.59 4684.99 -2660.06 7442.63 5966091.32 569584.90 MWD+IFR-AK-CAZ-SC 10075.49 69.16 110.19 4819.49 4718.89 -2691.61 7527.08 5966060.47 569669.59 MWD+IFR-AK-CAZ-SC 10170:92 68.02 109.47 4854.32 4753.72 -2721.75 7610.65 5966031.03 569753.40 MWD+IFR-AK-CAZ-SC 10265.71 70.40 106.59 4887.97 4787.37 -2749.16 7694.91 5966004.32 569837.87 MWD+IFR-AK-CAZ-SC 10361.36 68.21 107.10 4921.77 4821.17 -2775.08 7780.54 5965979:11 569923.71 MWD+IFR-AK-CAZ-SC 10456.80 66.75 107.19 4958.32 4857.72 -2801.07 7864.78 5965953.82 570008.16 MWD+IFR-AK-CAZ-SC 10563.76 64.88 106.90 5002.14 4901.54 -2829.67 7958.06 5965926.00 570101.66 MWD+IFR-AK-CAZ-SC '! 10655.25 62.48 107.76 5042.71 4942.11 -2854.09 8036.34 5965902.23 570180.13 MWD+IFR-AK-CAZ-SC 10754.61 60.22 108.29 5090.34 4989.74 -2881.07 8119.25 5965875.95 570263.26 MWD+IFR-AK-CAZ-SC ' 10851.14 58.20 110.18 5139.76 5039.16 -2908.37 8197.54 5965649.30 570341.76 MWD+IFR-AK-CAZ-SC 10945.18 57.76 110.70 5189.62 5089.02 -2936.21 8272.25 5965822.07 570416.70 MWD+IFR-AK-CAZ-SC 11038.98 56.35 110.98 5240.63 5140.03 -2964.21 8345.82 5965794.69 570490.48 MWD+IFR-AK-CAZ-SC 11047.96 56.25 111.20 5245.61 5145.01 -2966.90 8352.79 5965792.05 570497.47 MWD+IFR-AK-CAZ-SC 11144.52 58.39 110.01 5297.75 5197.15 -2995.49 8428.86 5965764.10 570573.77 MWD+IFR-AK-CAZ-SC '~i 11248.48 61.88 108.38 5349.51 5248.91 -3025.11 8513.99 5965735.19 570659.14 MWD+IFR-AK-CAZ-SC 11348.25 65.08 107.83 5394.05 5293.45 -3052.84 8598.84 5965708.17 570744.20 MWD+IFR-AK-CAZ-SC ORIGINAL ~Halliburton Company Global Report omp uiy: ConocoPhillips Alaska Inc. Date: 11/3/2005 Time: 14:36 05 ` Page: 4 ~ield: Kuparuk River Unit Co-ordinate(NE~ Reference: Well: Plan. 1C-28, True North itc: Kuparuk 1C Pad Vertical (TVD) Reference: 1C-28L1Rig: 100.6 rVell: Plan: 1C-28 Section (VS) Refereuccr Well (O.OON,O.OOE,90.50Azi) r1'ellpath: 1C-28t-1 Rig Survey CalculAtion Method: Minimum Curvature Db: Oracle. !. Sur~~e~~ - - - _ - - ~ -- -_ - - - - -_ - - _ __. - _ _ - - - - --I ,~1D lucl :~zim TVD Sps T~'D V/S G/~V DIapN ~~larpE hoof I ft deg deg ft ft ft ft ft ft 11446.91 69.89 105.47 5431.82 5331.22 -3078.91 8686.13 5965682.82 570831.70 MWD+IFR-AK-CAZ-SG 11545.17 72.23 104.70 5463.71 5363.11 -3103.09 8775.86 5965659.38 570921.62 MWD+IFR-AK-CAZ SC 11641.85 71.64 105.32 5493.69 5393.09 -3126.90 8864.64 5965636.32 571010.58 MWD+IFR-AK-GAZ-SC 11739.45 72.46 106.16 5523.77 5423.17 -3152.09 8954.01 5965611.87 571100.15 MWD+IFR-AK-CAZ-SC ~! 11838.60 73.78 105.50 5552.56 5451.96 -3177.96 9045.28 5965586.75 571191.63 MWD+IFR-AK-CAZ-SC ', 11940.73 73.08 106.23 5581.69 5481.09 -3204.72 9139.44 5965560.78 571285.99 MWD+IFR-AK-CAZ-SG 12035.71 72.48 106.22 5609.81 5509.21 -3230.07 9226.55 5965536.15 571373.30 MWD+IFR-AK-CAZ-SC 12134.70 71.86 108.47 5640.12 5539.52 -3258.16 9316.50 5965508.81 571463.47 MWD+IFR-AK-CAZ-SC 12233.47 72.93 104.85 5670.00 5569.40 -3285.14 9406.67 5965482.59 571553.85 MWD+IFR-AK-CAZ-SC II 12332.84 73.41 104.72 5698.77 5598.17 -3309.41 9498.64 5965459.08 571646.01 MWD+IFR-AK-CAZ-SC 12431.89 72.30 106.28 5727.97 5627.37 -3334.70 9589.84 5965434.55 571737.41 MWD+IFR-AK-CAZ-SC 12527.43 72.10 107.02 5757.18 5656.58 -3360.76 9676.99 5965409.21 571824.76 MWD+IFR-AK-CAZ-SC i 12622.95 71.50 107.72 5787.02 5686.42 -3387.85 9763.59 5965382.84 571911.58 MWD+IFR-AK-CAZ-SC 12718.29 72.60 108.98 5816.40 5715.80 -3416.41 9849.68 5965355.00 571997.89 MWD+IFR-AK-CAZ-SC 12812.98 73.45 110.15 5844.04 5743.44 -3446.73 9935.01 5965325.38 572083.46 MWD+IFR-AK-CAZ-SC 12908.84 72.56 109.63 5872.06 5771.46 -3477.92 10021.21 5965294.91 572169.91 MWD+IFR-AK-CAZ-SC 13003.40 72.26 108.83 5900.64 5800.04 -3507.61 10106.32 5965265.93 572255.25 MWD+IFR-AK-CAZ-SC ' 13097.67 72.41 108.13 5929.25 5828.65 -3536.08 10191.51 5965238.17 572340.67 MWD+IFR-AK-CAZ-SC 13193.75 73.46 108.01 5957.44 5856.84 -3564.57 10278.83 5965210.41 572428.21 MWD+IFR-AK-CAZ-SC 13288.59 73.68 108.43 5984.27 5883.67 -3593.02 10365.24 5965182.68 572514.84 MWD+IFR-AK-CAZ-SC i 13384.05 72.36 109.85 6012.14 5911.54 -3622.95 10451.49 5965153.47 572601.33 MWD+IFR-AK-CAZ-SC ~! 13400.00 71.88 110.34 6017.04 5916.44 -3628.16 10465.74 5965148.37 572615.62 MWD+IFR-AK-CAZ-SC 13426.36 71.09 111.16 6025.d1 5924.81 -3637.02 10489.11 5965139.71 572639.07 MWD+IFR-AK-CAZ-SC 13477.99 67.66 110.52 6043.60 5943.00 -3654.21 10534.27 5965122.90 572684.36 MWD+IFR-AK-CAZ-SC 13527.38 65.63 111.13 6063.18 5962.58 -3670.32 10576.65 5965107.13 572726.86 MWD+IFR-AK-CAZ-SC , 13568.56 65.77 110.82 6080.12 5979.52 -3683.76 10611.69 5965093.99 572762.02 MWD+IFR-AK-CAZ-SC 13662.77 64.63 108.36 6119.64 6019.04 -3712.44 10692.25 5965065.98 572842.80 MWD+IFR-AK-CAZ-SC 13755.23 64.88 106.10 6159.08 6058.48 -3737.21 10772.12 5965041.88 572922.87 MWD+IFR-AK-CAZ-SC 13852.84 66.38 107.39 6199.36 6098.76 -3762.83 10857.25 5965016.97 573008.20 MWD+IFR-AK-CAZ-SC 13948.92 66.31 106.94 6237.91 6137.31 -3788.80 10941.34 5964991.69 573092.49 MWD+IFR-AK-CAZ-SG 14043.82 65.59 106.24 6276.58 6175.98 -3813.54 11024.39 5964967.64 573175.74 MWD+IFR-AK-CAZ-SC 14139.11 64.55 108.01 6316.75 6216.15 -3838.98 11106.97 5964942.89 573258.52 MWD+IFR-AK-CAZ-SC 14234.46 65.22 107.21 6357.22 6256.62 -3865.10 11189.26 5964917.45 573341.01 MWD+iFR-AK-CAZ-SC 14329.37 67.58 106.37 6395.22 6294.62 -3890.22 11272.52 5964893.03 573424.47 MWD+IFR-AK-CAZ-SC 14423.50 71.52 106.64 6428.10 6327.50 -3915.27 11357.06 5964868.68 573509.21 MWD+IFR-AK-CAZ-SC 14519.52 73.79 104.47 6456.72 6356.12 -3939.83 11445.35 5964844.85 573597.69 MWD+IFR-AK-CAZ-SC 14614.31 77.70 104.85 6480.06 6379.46 -3963.08 11534.21 5964822.34 573686.73 MWD+IFR-AK-CAZ-SG j 14709.40 80.73 102.19 6497.86 6397.26 -3984.91 11625.02 5964801.27 573777.71 MWD+IFR-AK-CAZ-SC 14761.70 14845.56 14875.63 14927.59 14968.09 15059.07 15108.29 15154.68 15248.97 15287.92 15339.32 i ,. 15378.00 82 66 100 05 6505. 41 6404. 81 -3994. 88 11675. 79 5964791.71 573828. 56 MWD+IFR-AK-CAZ-SC . 86 81 . 99 48 6513. 10 6412. 50 -4009. 04 11758. 07 5964778.24 573910. 94 MWD+IFR-AK-CAZ-SG ~ . 87 06 . 99 79 6514. 71 6414. 11 -4014. 07 11787. 68 5964773.46 573940. 58 , MWD+IFR-AK-CAZ-SC . 88 54 . 101 23 6516. 71 6416. 11 -4023. 54 11838 .72 5964764.41 573991. 70 MWD+IFR-AK-CAZ-SC . 87. 92 . 103. 41 6517. 96 6417. 36 -4032. 18 11878 .27 5964756.10 574031. 31 MWD+IFR-AK-CAZ-SC 88 85 106 93 6520 .52 6419 .92 -4055. 97 11966 .03 5964733.04 574119. 26 MWD+IFR-AK-CAZ-SC . 92 06 . 105 63 6520 .13 6419 .53 -4069. 77 12013 .27 5964719.64 574166 .61 MWD+IFR-AK-CAZ-SC . 94 53 . 104. 07 6517 .46 6416 .86 -4081. 63 12058 .03 5964708.14 574211 .46 MWD+IFR-AK-CAZ-SC . 92 86 103 86 6511 .39 6410 .79 -4104. 34 12149 .34 5964686.19 574302 .94 MWD+IFR-AK-CAZ-SC 93 . .78 . 103. 80 6509 .13 6408 .53 -4113. 64 12187 .10 5964677.21 574340 .77 MWD+IFR-AK-CAZ-SG 95 33 103 33 6505 .05 6404 .45 -4125. 65 12236 .90 5964665.61 574390 .67 MWD+IFR-AK-CAZ-SC 95 . .33 . 103 .33 6501 .46 6400 .86 -4134 .53 1227A .38 5964657.04 574428 .22 PROJECTED to TD_ ORIGINAL :] • Subfeet: RE: 1C-28 tmplanned sidetrack From:"Billingsley, Tini A" <TimA.Billingsley a~conocophilliPs.coi~n~ Date: ~'[on, _,l flee ~ri0~ 1-I:>-1:2~ -0900 'To:''~fh~mlas ~~launder <-tc,m ~l~auui~c~~ dsadmTn.statc ;~1:.17s~, ~tc'vc~ day irsa:admin.statc.ak.u~ C'C: "~l homa;, Ran~l~ I " <k~indy.I,.l hrima~;~ucon~~c<~~,}lillip~.cc~n~-~. "Pertet[a, Patrick 1" ~-Patrick.1.Prrtclta.~rc~--,nocoh~iilliP.com-~, ",-~1ll~u(,-1)r~~kc, 5h:~ron K,~ 'Sh:iron.T~.;~llsttp-[)r~~kc'~r~con~~cohhilliE~s.eum~~°, °Lin~har~~cr. [tir~,in l." =f~r~in.L.l,i~~cb n~cr;~ic~mocophilGpS.cr~m~ Tom Maunder/Steve Davies, Thank you for the quick reply. We will need to wait to see exactly where we get successfully sidetracked and then will submit the 401 for the L1 orphaned wellbore. Tim Billingsley Drilling Engineer 907-265-6531 office 907-346-3092 home 907-230-9378 cell -----Original Message----- From: Thomas Maunder [mailtc:tom maur_der~admin..st:ate.ak.usl Sent: Monday, October 31, 2005 1:50 PM To: Billingsley, Tim A Cc: Steve Davies Subject: Re: 1C-28 unplanned sidetrack Tim, Thanks for the update. I spoke with Steve Davies and you should plan to submit a 401 for the orphaned hole section naming it L1. I do understand that your intent i_s to proceed to the originally planned BHL but, as Steve reminded me, al.l segments need permits. Waiting until the end of the well is not the option I believed it might be. We will look forward to receiving the application. Continued operations are acceptable. Tom Maunder, PE AOGCC Billingsley, Tim A wrote, On 1Of31/2005 1:41 PM: Tom Maunder, On 1C-28, drilling was stopped at 15,378' MD because the rotary steerable assembly was not able to correct an upward trend in the drilling and the bit was alrlost out of the top of the Kuparuk C-4 zone. The last survey indicated the hole was at 95.3 degrees and still climbing even though t:he rotary steerable had been trying to drop angle. It was determined that we could not correct this wellbore without drilling a significant amount of "D" shale above the C-4 pay interval. The rotary steerable assembly was pulled and a motor with a 1.5 deg bend was run. An open hole sidetrack over the weekend was attempted at 15, 248' but was unsuccessful in sidetracking from the original wellbore. The BHA was pulled and a motor with a 1.83 deg bend will be run tonight (Monday October 31, 2005). The proposed plan is to sidetrack the well at approximately 15,130' MD and resume drilling the plan:aed well path with the 1.83 deg bend motor. The orphaned lateral from approximately 15,130' to 15,378' will not be plugged and will not be cased with a slotted liner. The orphaned lateral will be mosr_ly in Kuparuk C-4 reservoir. The 6-3/4" hole will be drilled from the sidetrack point to the planned TD of 18,953' MD with a slotted 4-1/2" liner run from TD to 150' above the 7-5/8" casing shoe at 14,781'. Please advise of any official applications/reports which will be needed once the sidetrack plan is successfully accomplished. Tim Billingsley Drilling Engineer ': 907-265-6531 office 907-346-3092 home 907-230-9378 cell :7 TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME ~2t~t- ~~r Z~ ~' PTD# 7~S - ~ CHECK WHAT ADD-ONS "CLUE" APPLIES (OPTIONS) MULTI The permit is or a new wellbore segment of LATERAL existing well ~ie~ ~~ ~ ~~ So "U~- 23 ~S- j0 API No . Permit No~ (If API number Production should continue to be reported as last two (2) digits a function of .the original API number stated are between 60-69) above. PILOT HOLE In accordance with 20 AAC 25.005(f), all (per records, data and logs acquired for the pilot hole must be clearly differentiated in bath ~ name (name on permit plus PH) and API number (SO - 70/80) from records, data and logs acquired for well (name on permit). SPACING The permit is approved subject to fuli , EXCEPTION compliance with ZO AAC 25.055. Approval to ~ perforate and uroduceliniect is contingent upon issuance of a conservation order approving a spacing exception. (Comnanv Name) assumes the liability of any protest to the spacing exception that may occur. d to the itt b DRY DITCH e m All dry ditch sample sets su SAMPLE Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and f 10' sample intervals through target zones. ?,~O -ad Rev: 04/01105 C\jody\transmittal_checklist WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RV OIL - 490100 Well Name: KUPA UK RIV UNIT 1C-28L1 Program DEV Well bore seg 0 PTD#:2051730 Company CONOCOPHILLIPS ALASKA INC Initial Classffype DEV! PEND GeoArea 890 Unit 11160 OnlOff Shore On Annular Disposal Administration 1 Permit fee attached- - - - - - _ - - - _ - N_A_ - _ . Unplanned, orphaned multilaateral well-b_rameh; fee waived_per 20 AAC 25.005(e} 2 Lease numberappropriate______ _______ ___-___-_______ -_- -_-_-Yes_ -__-.___ 3 Unique well-name and numbe[.__,._______________________ _________ Yes_ ,_.___--__-__._ 4 Well located in a-defnedpool- - _ - - - _ - - _ Yes - _ _ - -KUPARUK RIVER,_KUPARUK RVOIL-490100„ governed by Conservation Order No.4320 - - 5 Well locatedp(operdistancefromdrillingunit_bountlary___ __________ __-_-_.__Yes_ __----._.-.-._--__.-._.---_--__-.-___.-__-.__--_.-.--_---_---_.-.__ I6 Well located proper distance from other wells_ - - Yes _ _ _ - _ Consseruation Order No. 4320 has no interwell_spacing_restrictions, - - - - 7 Sufficient acreage-available igdrilling un)t- - - - - - - - - - - - - - - - - - - - - -Yes - Conservation Order Nc. 432C has no in_terwell_spaeing_restnctions, Wellbore_is more than 500' from- - - . - - 8 If deviated, )s_wehf~ore plat included - _ - - - - - - - - - - - - -- No_ an-external property line where_ownership or-landownership changes. Welibore profile included with app. - . 9 Operator only affected party- - - - -Yes - - 10 Ope[akorhasappropriaie-bondinforce_______________________ _.._.._._Yes- _-,____..__.___.___.___._ 11 Permit. can be issued withoutconservatignorder___________________ _________Yes_ -_,_._-_ __ -__-__-_-_-__._.___-___-_--_____-___-_-______-___-_____ Appr Date 12 Permit-can beis5uedwithoutadminist[ative_approval________________ ______-_Yes_ _-_____- -_.________-_.__-______-___-_---______._-_._______._-_ __ 113 Can permit be approved before 15-day wait Yes SFD 11!14!2005 14 Well located within arQa and strata auth4nzed by Injection Order- # (put1O# in-comments)_(For_ NA_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ . _ _ _ _ _ - _ - . _ . _ - _ . _ _ _ - _ - _ _ _ _ - _ _ 15 Allwellswithin114_milea[eaof[eyiewidentified(Fo[servicewellonly)______ _________ NA__ __~__-__-._--__ -___._.-._-_~__._.___-__.~_._.__-___._,-___________-__--._ 16 Pre-produced injector; duration of pre production less than_ 3 months-(For service well only) . NA- - 17 ACMP-Finding of Consistency_hasbeenissued_forthisproject-_,_.___-_- __-__-- NA__ __________________________-_-_____-_-_-__-__--_--_-----___.__________ Engineering 18 Conductorstring_provided________________________________ _________ NA__ ___-_Conduetorset_inmot_herbore,.1C-28.(205-1.04).__-__-__-- --_--_ 19 Surface casing_protectsallknown_USDWs____________________ ___.___ NA__ __-_ All aquifers exempted, 40CFR_147.102(b)(3)._-__ __-________--__-_.__-__-_. 20 CMT-vol_adeguate_tocircul_ate-onconductor&surf.csg____ __________ ___--_-_ N_A__ _____SUrfacecasingsetin_motherbore.-__,-_-___._-_-_.___-__--_-_._._- 21 CMT vol_ adegu_ate-to tie-in long string tosurf csg_ - . N_A- _ _ Production. casing set in motherbore.. . - . _ _ - - 22 CMT.wi(Icoyerallknown,productiyehorizons__________________ __---_--No_- --_-.Open-hole completionplanned,___--__-__-___-__-_-_-_-_.__---__-_-_.___-_-_ 1 23 Casing designs adequate for C, T, B &. permafrost- - - ~ - - - - - - 24 Adequate tan_kage_or re_serye pit . - - _ . - - - - _ _ . -Yes _ _ - - - -Rig is-equipped with steel_pits. No reserve_pitplanned, All waste to approved annulus or disposal well(s). - - 25 If_a-re-drill,has_a.10-403forabandonmentbeenapproved_- -___-___ -____,__NA__ ______________-___,__- -_-___-_____-___-_-_-___-_-- -_-_._ 26 Adequate wellbore separation_proposed_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ - _ _ - -Only proximate wellbore-section is_motherbore. _Both_are located-within reservoir._ . _ _ . _ _ - . _ _ _ - _ . _ _ _ _ 27 If_dmerter required, does it meet regulations- - _ NA_ - BOP stack_already m place - _ Appr Date 1 28 Dnllrng flu)d_ program schematic & equip list adequate- _ Yes . - Maximum expected formation pressure 9,4 EMW._ Planned MW up to 9.5 ppg.. - - TEM 1111512 005 29 BOPEs,_do they meet regulation - - - - - Yes - - 1 / ~ ~'M /I 1 ~° 30 BOPE-press rating appropriate; test to_(put p5ig in,comments}_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ - _ _ _ - - MA$P calculatedat 2497psi, 3500_psi_appropriale. - _ _ _ . _ - _ . _ - _ - - _ . _ ~ 31 Chokemanifoldcomp_IieswlAPl_RP-53 (May 84)______-,----- -_-. _--Yes- --------------------- --------------------.------.------------.----.--- 32 Work willoccurwithoutoperationshutdown__________ ___________ __._----Yes_ _-____-_________-__-_-_-_-__--__-__-__ -__-__.__-___- ___-____ -_ 33 Is presence_gf H2$ gas probable _ - - - - _ - - - - - -Yes _ _ _ - Up to 90 ppm H2S measured_ in 9ffset wells.- Mud should precludeH2S-on rig, Rig.has sensors and alarms... - 34 Mechanical_conditionofwellswithinAORyerified(Fo[servicewellonly)-___ -_ -__-_ NA-_ -____-_-____-_-_________________.______-- Geology 35 Permit.can be issued wlo hydrogen_sulfiderneasures - - -- - - - - - - - - - - - - - _ No_ - _ - Offset 1C-Pad wells measured from 70 to 90 ppm H2S on_8I30/Z005. _ - - - - - - - - - 36 Data_presented on_ potential overpressure zones . - . - - - - - - - - - - - - - - - - - Yes - - - Expected r_eseruoirpressure is 7,3 to 9.4 ppg EMW; will be drilled with 9.2 to 9,5 ppg mud._ . - - - _ Appr Date 37 Seismic analysisof shallow gas-zones_ - _ - NA_ - SFD 1111412005 38 Seabed condition survey.(if off_-shore) - NA 39 Contact namelphone forweekly progress reports [exploratory only! - _ - - tJA- _ - _ Geologic Engineering Publ' Date Date: ' Dafe Orphaned multilateral well branch drilled and abandoned during late October 2005 when the operator performed an openhole Commissioner: D f Commissioner: C sio r /` JI ~ ~ 1 ~ /f~ f 4 ~~(~" course correction. A permit to drill is required for this orphaned well branch because it penetrated the Kuparuk reservoir // ~~ ~~ interval and it was left open when the course correction was performed. If this well branch remains open, it will contribute ~ / N ^ production to the main 1C-28 well bore. SFD 11114/2005 • • ~J Well History File APPENDIX Information of detailed nature that is not • particularly gem~ane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Thu Jan 19 16:28:16 2006 Reel Header Service name .............LISTPE Date .....................06/01/19 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library Tape Header Service name .............LISTPE Date .....................06/01/19 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Library Physical EOF 134 35 aa~- l7 3 Scientific Technical Services Scientific Technical Services Comment Record TAPE HEADER Kuparuk River Unit MWD/MAD LOGS WELL NAME: 1c-2811 API NUMBER: 500292327060 OPERATOR: ConocoPhillips Alaska, Inc. LOGGING COMPANY: Sperry Drilling Services TAPE CREATION DATE: 19-JAN-06 JOB DATA MWD RUN 4 MWD RUN 5 MWD RUN 6 JOB NUMBER: MW0003922104 MW0003922104 MW0003922104 LOGGING ENGINEER: B. HENNINGSE B. HENNINGSE B. HENNINGSE OPERATOR WITNESS: G. WHITLOCK G. WHITLOCK G. WHITLOCK MWD RUN 7 MWD RUN 8 MWD RUN 9 JOB NUMBER: MW0003922104 MW0003922104 MW0003922104 LOGGING ENGINEER: P. SMITH P. SMITH P. SMITH OPERATOR WITNESS: F. HERBERT F. HERBERT F. HERBERT MWD RUN 10 MWD RUN 12 JOB NUMBER: MW0003922104 MW0003922104 LOGGING ENGINEER: P. SMITH B. HENNINGSE OPERATOR WITNESS: F. HERBERT G. WHITLOCK SURFACE LOCATION SECTION: 12 TOWNSHIP: 11N RANGE: l0E FNL: 1548 FSL: FEL: FWL: 1114 ELEVATION (FT FROM MSL 0) r KELLY BUSHING: DERRICK FLOOR: 100.90 GROUND LEVEL: 60.60 WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.875 10.750 9221.0 6.750 7.625 14781.0 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELL WAS DRILLED OFF OF A CEMENT PLUG AT 13400'MD IN THE 1C-28 PB1 WELL. 4. MWD RUNS 1-3 WERE DIRECTIONAL ONLY - NO DATA ARE PRESENTED. 5. MWD RUNS 4-10,12 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS; ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4); AND PRESSURE-WHILE-DRILLING (PWD) MWD RUN 12 ALSO INCLUDED COMPENSATED THERMAL NEUTRON POROSITY (CTN) AND AZIMUTHAL LITHO-DENSITY (ALD) MWD RUNS 4-7,12 INCLUDED GEO-PILOT ROTARY STEERABLE BHA (GP) THE EWR SENSORS DID NOT EXIT THE CASING ON RUN 4 - NO DATA ARE PRESENTED. NO DATA WERE ACQUIRED ON RUNS 11. 6. DEPTH SHIFTING OF MWD DATA WAS WAIVED PER E-MAIL, DATED 12/16/04, FROM M. WERNER (CPAI) TO R. KALISH (SDS) MWD DATA ARE CONSIDERED PDC. 7. MWD RUNS 4-10,12 REPRESENT WELL 1C-28 L1 WITH API#: 50-029-23270-60. THIS WELL REACHED A TOTAL DEPTH (TD) OF 15378'MD/6501'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (DEEP SPACING). TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE MATRIX, FIXED HOLE SIZE), CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN) . SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN). SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. SLDSLIDE = NON-ROTATED INTERVALS REFLECTING SENSOR DEPTHS. PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: 6.75" MUD WEIGHT: 9.1 - 9.5 PPG MUD SALINITY: 11,500 - 23,000 PPM CHLORIDES FORMATION WATER SALINITY: 11,000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE File Header Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 9203.0 15320.5 RPX 9215.5 15327.5 RPS 9215.5 15327.5 RPM 9215.5 15327.5 RPD 9215.5 15327.5 FET 9215.5 15327.5 ROP 9237.5 15378.0 NPHI 14707.0 15294.5 NCNT 14707.0 15294.5 FCNT 14707.0 15294.5 RHOB 14722.0 15308.5 DRHO 14722.0 15308.5 PEF 14722.0 15308.5 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 4 9203.0 9257.0 MWD 5 9257.0 9622.0 MWD 6 9622.0 10537.0 MWD 7 10537.0 11065.0 MWD 8 11065.0 13400.0 MWD 9 13400.5 13612.0 MWD 10 13612.0 14800.0 MWD 12 14800.0 15378.0 REMARKS: MERGED MAIN PASS. Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 NPHI MWD PU-S 4 1 68 32 9 FONT MWD CNTS 4 1 68 36 10 NCNT MWD CNTS 4 1 68 40 11 RHOB MWD G/CM 4 1 68 44 12 DRHO MWD G/CM 4 1 68 48 13 PEF MWD BARN 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9203 15378 12290.5 12351 9203 15378 ROP MWD FT/H 0.03 1182.51 123.487 12282 9237.5 15378 GR MWD API 33.36 437.72 139.476 12236 9203 15320.5 RPX MWD OHMM 1.02 1206.5 4.70956 12225 9215.5 15327.5 RPS MWD OHMM 1.32 1463.21 5.68509 12225 9215.5 15327.5 RPM MWD OHMM 1.01 2000 9.69413 12225 9215.5 15327.5 RPD MWD OHMM 1.05 2000 17.3846 12225 9215.5 15327.5 FET MWD HOUR 0.17 224.27 4.41285 12225 9215.5 15327.5 NPHI MWD PU-S 18.23 51.28 31.4782 1176 14707 15294.5 FCNT MWD CNTS 160.23 610.25 425.056 1176 14707 15294.5 NCNT MWD CNTS 15444.7 27759.9 23400 1176 14707 15294.5 RHOB MWD G/CM 0.437 3.357 2.2219 1174 14722 15308.5 DRHO MWD G/CM -3.052 0.934 -0.0780324 1174 14722 15308.5 PEF MWD BARN 1.18 14.17 3.0556 1174 14722 15308.5 First Reading For Entire File..........9203 Last Reading For Entire File...........15378 File Trailer Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.002 Physical EOF t File Header Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9203.0 9222.0 ROP 9237.5 9257.0 LOG HEADER DATA DATE LOGGED: O1-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 9257.0 TOP LOG INTERVAL (FT) 9237.0 BOTTOM LOG INTERVAL (FT) 9257.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: .0 MAXIMUM ANGLE: .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 149206 EWR4 ELECTROMAG. RESIS. 4 66259 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 9.875 9221.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): LSND 9.50 54.0 9.7 800 6.0 1.800 75.0 .900 156.0 1.500 75.0 1.900 75.0 REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9203 9257 9230 109 9203 9257 ROP MWD040 FT/H 2.04 107.09 41.5356 40 9237.5 9257 GR MWD040 API 56.85 98.1 70.6033 39 9203 9222 First Reading For Entire File..........9203 Last Reading For Entire File...........9257 File Trailer Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.003 Physical EOF File Header Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPS 9215.5 9580.0 RPX 9215.5 9580.0 r RPD 9215.5 9580.0 FET 9215.5 9580.0 RPM 9215.5 9580.0 GR 9222.5 9588.0 ROP 9257.5 9622.0 LOG HEADER DATA DATE LOGGED: 02-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 9622.0 TOP LOG INTERVAL (FT) 9257.0 BOTTOM LOG INTERVAL (FT) 9622.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 70.2 MAXIMUM ANGLE: 70.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 119546 EWR4 ELECTROMAG. RESIS. 4 134760 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 9.875 9221.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 LSND 9.50 65.0 9.5 600 4.5 1.900 69.0 1.090 125.0 1.350 69.0 1.500 69.0 Name Service Order Units Size Nsam Rep Code Offset Channel L DEPT FT 4 1 68 0 1 ROP MWD050 FT/H 4 1 68 4 2 GR MWD050 API 4 1 68 8 3 RPX MWD050 OHMM 4 1 68 12 4 RPS MWD050 OHMM 4 1 68 16 5 RPM MWD050 OHMM 4 1 68 20 6 RPD MWD050 OHMM 4 1 68 24 7 FET MWD050 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9215.5 9622 9418.75 814 9215.5 9622 ROP MWD050 FT/H 0.14 265.89 60.3897 730 9257.5 9622 GR MWD050 API 78.65 121.39 102.918 732 9222.5 9588 RPX MWD050 OHMM 2.52 639.04 6.15347 730 9215.5 9580 RPS MWD050 OHMM 2.89 529.47 6.46708 730 9215.5 9580 RPM MWD050 OHMM 1.52 571.45 8.04449 730 9215.5 9580 RPD MWD050 OHMM 1.05 2000 33.5605 730 9215.5 9580 FET MWD050 HOUR 0.49 158.62 12.6578 730 9215.5 9580 First Reading For Entire File..........9215.5 Last Reading For Entire File...........9622 File Trailer Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.004 Physical EOF File Header Service name .............STSLIB.004 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY for each bit run in separate files. VENDOR TOOL CODE START DEPTH FET 9580.5 RPX 9580.5 RPS 9580.5 RPD 9580.5 RPM 9580.5 GR 9588.5 ROP 9622.5 STOP DEPTH 10492.0 10492.0 10492.0 10492.0 10492.0 10499.5 10537.0 LOG HEADER DATA DATE LOGGED: 05-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 10537.0 TOP LOG INTERVAL (FT) 9622.0 BOTTOM LOG INTERVAL (FT) 10537.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 66.8 MAXIMUM ANGLE: 70.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 119546 EWR4 ELECTROMAG. RESIS. 4 134760 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 9.875 DRILLER'S CASING DEPTH (FT) 9221.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G) 9.60 MUD VISCOSITY (S) 80.0 MUD PH: 8.5 MUD CHLORIDES (PPM): 700 FLUID LOSS (C3) 3.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) ~ MUD AT MEASURED TEMPERATURE (MT) 1.850 66.5 MUD AT MAX CIRCULATING TERMPERATURE: 20.020 122.0 MUD FILTRATE AT MT: 1.500 66.5 MUD CAKE AT MT: 1.550 66.5 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction.. .. ..............Down Optical log depth units.... ......Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD060 FT/H 4 1 68 4 2 GR MWD060 API 4 1 68 8 3 RPX MWD060 OHMM 4 1 68 12 4 RPS MWD060 OHMM 4 1 68 16 5 RPM MWD060 OHMM 4 1 68 20 6 RPD MWD060 OHMM 4 1 68 24 7 r FET MWD060 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9580.5 10537 10058.8 1914 9580.5 10537 ROP MWD060 FT/H 2.6 453.59 150.892 1830 9622.5 10537 GR MWD060 API 68.2 158.99 96.1003 1823 9588.5 10499.5 RPX MWD060 OHMM 2.51 47.92 5.08302 1824 9580.5 10492 RPS MWD060 OHMM 2.78 51.03 5.44418 1824 9580.5 10492 RPM MWD060 OHMM 2.92 49.61 5.73837 1824 9580.5 10492 RPD MWD060 OHMM 3.08 51.8 5.99325 1824 9580.5 10492 FET MWD060 HOUR 0.17 23.83 2.86977 1824 9580.5 10492 First Reading For Entire File..........9580.5 Last Reading For Entire File...........10537 File Trailer Service name .............STSLIB.004 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.005 Physical EOF File Header Service name .............STSLIB.005 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPM 10492.5 11028.0 FET 10492.5 11028.0 RPS 10492.5 11028.0 RPX 10492.5 11028.0 RPD 10492.5 11028.0 GR 10500.0 11036.0 ROP 10537.5 11065.0 LOG HEADER DATA DATE LOGGED: 06-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 11065.0 r TOP LOG INTERVAL (FT) 10537.0 BOTTOM LOG INTERVAL (FT) 11065.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 56.4 MAXIMUM ANGLE: 64.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAX 119546 EWR4 ELECTROMAG. RESTS. 4 134760 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 9.875 DRILLER'S CASING DEPTH (FT) 9221.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G) 9.70 MUD VISCOSITY (S) 82.0 MUD PH: 8.5 MUD CHLORIDES (PPM): 500 FLUID LOSS (C3) 3.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 1.450 72.0 MUD AT MAX CIRCULATING TERMPERATURE: .970 111.2 MUD FILTRATE AT MT: 1.300 72.0 MUD CAKE AT MT: 1.900 72.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order DEPT ROP MWD070 GR MWD070 RPX MWD070 RPS MWD070 RPM MWD070 RPD MWD070 FET MWD070 Name Service Unit DEPT FT Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 API 4 1 68 8 3 OHMM 4 1 68 12 4 OHMM 4 1 68 16 5 OHMM 4 1 68 20 6 OHMM 4 1 68 24 7 HOUR 4 1 68 28 8 First Last Min Max Mean Nsam Reading Reading 10492.5 11065 10778.8 1146 10492.5 11065 ROP MWD070 FT/H 23.69 907.61 194.937 1056 10537.5 11065 GR MWD070 API 35.79 138.27 95.7149 1073 10500 11036 RPX MWD070 OHMM 1.45 7.19 3.15132 1072 10492.5 11028 RPS MWD070 OHMM 1.54 8.27 3.24377 1072 10492.5 11028 RPM MWD070 OHMM 1.59 9.95 3.3549 1072 10492.5 11028 RPD MWD070 OHMM 1.58 8.45 3.46835 1072 10492.5 11028 FET MWD070 HOUR 0.17 33.15 3.25395 1072 10492.5 11028 First Reading For Entire File..........10492.5 Last Reading For Entire File...........11065 File Trailer Service name .............STSLIB.005 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.006 Physical EOF File Header Service name .............STSLIB.006 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY for each bit run in separate files. VENDOR TOOL CODE START DEPTH STOP DEPTH FET 11028.5 13400.0 RPD 11028.5 13400.0 RPM 11028.5 13400.0 RPS 11028.5 13400.0 RPX 11028.5 13400.0 GR 11036.5 13400.0 ROP 11065.5 13400.0 LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 11-OCT-05 Insite 66.37 Memory 13400.0 11065.0 13400.0 58.4 81.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUM$ER DGR DUAL GAMMA RAY 103770 EWR4 ELECTROMAG. RESIS. 4 134758 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 9.875 DRILLER'S CASING DEPTH (FT) 9221.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G) 10.20 MUD VISCOSITY (S) 64.0 MUD PH: 9.5 MUD CHLORIDES (PPM): 500 FLUID LOSS (C3) 2.3 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) 1.500 85.0 MUD AT MAX CIRCULATING TERMPERATURE: 20.330 141.4 MUD FILTRATE AT MT: 1.400 70.0 MUD CAKE AT MT: 1.860 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD080 FT/H 4 1 68 4 2 GR MWD080 API 4 1 68 8 3 RPX MWD080 OHMM 4 1 68 12 4 RPS MWD080 OHMM 4 1 68 16 5 RPM MWD080 OHMM 4 1 68 20 6 RPD MWD080 OHMM 4 1 68 24 7 FET MWD080 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 11028.5 13400 12214.3 4744 11028.5 13400 ROP MWD080 FT/H 2.87 638.12 133.881 4670 11065.5 13400 GR MWD080 API 82.14 268.04 172.898 4728 11036.5 13400 RPX MWD080 OHMM 1.29 11.1 3.97936 4744 11028.5 13400 RPS MWD080 OHMM 1.52 19.13 5.04472 4744 11028.5 13400 RPM MWD080 OHMM 1.71 224.41 8.89051 4744 11028.5 13400 RPD MWD080 OHMM 1.7 1326.63 9.96415 4744 11028.5 13400 FET MWDO80 HOUR 0.22 32.96 1.28499 4744 11028.5 13400 First Reading For Entire File..........11028.5 Last Reading For Entire File...........13400 File Trailer Service name .............STSLIB.006 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.007 Physical EOF File Header Service name .............STSLIB.007 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPX 13400.5 13561.0 GR 13400.5 13569.0 RPS 13400.5 13561.0 RPM 13400.5 13561.0 RPD 13400.5 13561.0 FET 13400.5 13561.0 ROP 13400.5 13612.0 LOG HEADER DATA DATE LOGGED: 15-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 13612.0 TOP LOG INTERVAL (FT) 13400.0 BOTTOM LOG INTERVAL (FT) 13612.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 65.6 MAXIMUM ANGLE: 71.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 103770 EWR4 ELECTROMAG. RESIS. 4 134758 BOREHOLE AND CASING DATA ~ r OPEN HOLE BIT SIZE (IN) 9.875 DRILLER'S CASING DEPTH (FT) 9221.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 10.20 68.0 10.0 500 3.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 1.970 65.0 1.010 133.0 2.500 65.0 1.950 65.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD090 FT/H 4 1 68 4 2 GR MWD090 API 4 1 68 8 3 RPX MWD090 OHMM 4 1 68 12 4 RPS MWD090 OHMM 4 1 68 16 5 RPM MWD090 OHMM 4 1 68 20 6 RPD MWD090 OHMM 4 1 68 24 7 FET MWD090 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13400.5 13612 13506.3 424 13400.5 13612 ROP MWD090 FT/H 0.03 1182.51 75.2153 424 13400.5 13612 GR MWD090 API 70.76 208.85 138.635 338 13400.5 13569 RPX MWD090 OHMM 1.13 7.7 4.97255 322 13400.5 13561 RPS MWD090 OHMM 1.32 11.97 6.61857 322 13400.5 13561 RPM MWD090 OHMM 1.48 32.41 11.5533 322 13400.5 13561 RPD MWD090 OHMM 1.38 31.64 11.3566 322 13400.5 13561 FET MWD090 HOUR 0.95 3.97 2.42578 322 13400.5 13561 First Reading For Entire File..........13400.5 Last Reading For Entire File...........13612 File Trailer ~ , Service name .............STSLIB.007 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.008 Physical EOF File Header Service name .............STSLIB.008 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. $IT RUN NUMBER: 10 DEPTH INCREMENT: .5000 #~ FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPS 13561.5 14748.5 RPX 13561.5 14748.5 RPM 13561.5 14748.5 RPD 13561.5 14748.5 FET 13561.5 14748.5 GR 13569.5 14756.5 ROP 13612.5 14800.0 LOG HEADER DATA DATE LOGGED: 18-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 14800.0 TOP LOG INTERVAL (FT) 13612.0 BOTTOM LOG INTERVAL (FT) 14800.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 64.6 MAXIMUM ANGLE: 82.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 103770 EWR4 ELECTROMAG. RESTS. 4 134758 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.750 DRILLER'S CASING DEPTH (FT): 9221.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 10.20 MUD VISCOSITY (S): 61.0 ,. ~ ~ • MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 9.4 500 2.4 2.700 65.0 .610 311.0 1.960 65.0 1.970 65.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD100 FT/H 4 1 68 4 2 GR MWD100 API 4 1 68 8 3 RPX MWD100 OHMM 4 1 68 12 4 RPS MWD100 OHMM 4 1 68 16 5 RPM MWD100 OHMM 4 1 68 20 6 RPD MWD100 OHMM 4 1 68 24 7 FET MWD100 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13561.5 14800 14180.8 2478 13561.5 14800 ROP MWD100 FT/H 1.7 447.72 78.6524 2376 13612.5 14800 GR MWD100 API 46.16 437.72 176.747 2375 13569.5 14756.5 RPX MWD100 OHMM 1.58 13.12 3.77971 2375 13561.5 14748.5 RPS MWD100 OHMM 1.64 13.56 4.47449 2375 13561.5 14748.5 RPM MWD100 OHMM 1.89 24.09 5.99685 2375 13561.5 14748.5 RPD MWD100 OHMM 1.9 42.39 5.96477 2375 13561.5 14748.5 FET MWD100 HOUR 0.4 41.64 1.43458 2375 13561.5 14748.5 First Reading For Entire File..........13561.5 Last Reading For Entire File........,..14800 File Trailer Service name .............STSLIB.008 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.009 ,y a 1 H Physical EOF File Header Service name .............STSLIB.009 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06jO1j19 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.008 Comment Record FILE HEADER FILE NUMBER: 9 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 12 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH NPHI 14707.0 15294.5 FCNT 14707.0 15294.5 NCNT 14707.0 15294.5 PEF 14722.0 15308.5 RHOB 14722.0 15308.5 DRHO 14722.0 15308.5 FET 14749.0 15327.5 RPX 14749.0 15327.5 RPS 14749.0 15327.5 RPD 14749.0 15327.5 RPM 14749.0 15327.5 GR 14757.0 15320.5 ROP 14800.5 15378.0 LOG HEADER DATA DATE LOGGED: 28-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 15378.0 TOP LOG INTERVAL (FT) 14800.0 BOTTOM LOG INTERVAL (FT) 15378.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 86.8 MAXIMUM ANGLE: 95.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 178513 CTN COMP THERMAL NEUTRON 10603684 EWR4 Electromag Resis. 4 159439 ALD Azimuth. Litho-Den 105089 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 6.750 DRILLER'S CASING DEPTH (FT): 14781.0 BOREHOLE CONDITIONS MUD TYPE: Flo-Pro MUD DENSITY {LB/G) 9.20 .~ ~.. MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 70.0 8.3 21500 3.6 1.800 68.0 .890 144.3 2.600 68.0 3.000 68.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD120 FT/H 4 1 68 4 2 GR MWD120 API 4 1 68 8 3 RPX MWD120 OHMM 4 1 68 12 4 RPS MWD120 OHMM 4 1 68 16 5 RPM MWD120 OHMM 4 1 68 20 6 RPD MWD120 OHMM 4 1 68 24 7 FET MWD120 HOUR 4 1 68 28 8 NPHI MWD120 PU-S 4 1 68 32 9 FCNT MWD120 CNTS 4 1 68 36 10 NCNT MWD120 CNTS 4 1 68 40 11 RHOB MWD120 G/CM 4 1 68 44 12 DRHO MWD120 G/CM 4 1 68 48 13 PEF MWD120 BARN 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 14707 15378 15042.5 1343 14707 15378 ROP MWD120 FT/H 0.82 1026.18 125.383 1156 14800.5 15378 GR MWD120 API 33.36 80.57 59.004 1128 14757 15320.5 RPX MWD120 OHMM 1.02 1206.5 9.4789 1158 14749 15327.5 RPS MWD120 OHMM 1.34 1463.21 12.6783 1158 14749 15327.5 RPM MWD120 OHMM 1.01 2000 33.1915 1158 14749 15327.5 RPD MWD120 OHMM 7.35 2000 93.5107 1158 14749 15327.5 FET MWD120 HOUR 0.31 224.27 22.1934 1158 14749 15327.5 NPHI MWD120 PU-S 18.23 51.28 31.4782 1176 14707 15294.5 FCNT MWD120 CNTS 160.23 610.25 425.056 1176 14707 15294.5 NCNT MWD120 CNTS 15444.7 27759.9 23400 1176 14707 15294.5 RHOB MWD120 G/CM 0.437 3.357 2.2219 1174 14722 15308.5 DRHO MWD120 G/CM -3.052 0.934 -0.0780324 1174 14722 15308.5 PEF MWD120 BARN 1.18 14.17 3.0556 1174 14722 15308.5 ~ .,~• First Reading For Entire File..........14707 Last Reading For Entire File...........15378 File Trailer Service name .............STSLIB.009 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.010 Physical EOF Tape Trailer Service name .............LISTPE Date .....................06/01/19 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library. Reel Trailer Service name .............LISTPE Date .....................06/01/19 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Physical EOF Physical EOF Writing Library Scientific Technical Services Scientific Technical Services End Of LIS File