FACILITY REPORT OF PRODUCED GAS DISPOSITION
1330000002 1 Swanson River I Swanson River Unit
6.
Sold
199,729
7.
Reinjected
0
8.
Flared or vented 1 hour or less
150
9.
Flared or vented more than 1 hour (see instr.)
489'
10.
Pilot and Purge
1,473
11. Assist Gas
0
12. Fuel gas used in lease operations
80,245
13.
Other (see instructions)
0
14.
TOTAL VOLUME (ITEMS 6.13)
282,086
15.
NGL Gas Equivalent
2,716 *
16.
Purchased gas - Rental Return Gas
157,714
17.
Transferred from: (Off -lease Gas)
0
18.
Transferred to:
(89.842)
Transferred to: Swanson Storage 89,842
To storage for fuel usage: 0 to Storage for Injection:
89842
To storage for injection is included in Line 6 as subject to royalty.
Other: Hemlock Production Sold 61,813
cemry that the foregoing is true and correct to the best of my knowledge.
Signature �-ot�i Zc "
HILCORP ALASKA LLC
fi' -A
Use
I. P-1 Va-ay? ,,tk 01
January 2015
ach pool as a percent
Note: All volumes must be correcte
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
1.
6. Sold
199,728
7. Reinjected
0
S. Flared or vented 1 hour or less
150
9. Flared or vented more than 1 hour (see instr.)
488"
10. Pilot and Purge
1,473
11. Assist Gas
0
12. Fuel gas used in lease operations
80,245
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6.13)
282,086
15. NGL Gas Equivalent
16. Purchased gas - Rental Return Gas -' '`
157,714
17. Transferred from: (Off -lease Gas)
0
18. Transferred to:
(89,842)
Transferred to: Swanson Storage 89,842
To storage for fuel usage'. o to storage for injection
89842
To storage for Injection is included in Line 6 as subject to royalty.
Other: Hemlock Production Sold 61,813
certify that the foregoing/ is true and correct to the best of my knowledge.
Signature l� Dyi�' Title Prodi
1-1 sl.,Me Phone 713-:
20. For
Nate Nhr =�
RECEIVED
FEB 2 3 2015
A000C
LASKA LLC I January 21P15
pools, list contribution of each pool as a percent
Total Volume.
Use
3 -z.3 -/s-
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
-
-r- --: `, 0 705
OR FLARING
EVENTS GREATER
THAN
1 HOUR
Action Taken to Minimize
R tDate
01/01/2015
O No..
124250
Facili No
1330000002
Date Flared
1/16/2015
Start Time
10:00:00 PM
Ending Time
1:30:00 PM
End Date
1/17/2015
Planned
U
MCF
52.5
Descri lion of Flaring Event
Excess venting due to shutdown of
Compressor K-22 for unscheduled
maintenance to fix a leaky gas cooler.
Volume
Excess venting necessary until
cooler could be repaired and
compressor brought back
online.
Excess venting due to unscheduled
Excess venting necessary until
shutdown of Compressor K-22
ail and plugs could be changed
01/01/2015
124250
1330000002
1/19/2015
10:00:00 AM
6:00:00 PM
1/19/2015
U
27.2
because of low compressor lube
pressure.
Excess venting due to shutdown of
and compressor brought back
online.
Excess venting necessary until
01/01/2015
124250
1330000002
1/20/2015
12:35:00 AM
8:55:00 PM
1/23/2015
U
314.6
Compressor K-8 caused by
unscheduled maintenance after
losing a piston cylinder.
maintenance could be
completed and compressor
brought back online.
Excess flaring necessary until
Excess flaring due to shutdown of
the shuttle valve on the drip
01/01/2015
124250
1330000002
1/22/2015
10:30:00 AM
6:00:00 PM
1/22/2015
U
95.7
Compressor K-8 for unscheduled
maintenance caused by lube failure.
counter was replaced and
compressor brought back
online.
1330000002
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Swanson River I Swanson River Unit
6.
Sold
221,566
7.
Reinjected
0
8.
Flared or vented 1 hour or less
393'
9.
Flared or vented more than 1 hour (see instr.)
751
10.
Pilot and Purge
982 •
11. Assist Gas
0
12. Fuel gas used in lease operations
86,017
13.
Other (see instructions)
0
14.
TOTAL VOLUME (ITEMS 6.13)
309,033'
15.
NGL Gas Equivalent
6,456
16.
Purchased gas - Rental Return Gas
182,267
17.
Transferred from: (Off -lease Gas)
0
18.
Transferred to:
(35,098)
Transferred to: Swanson Storage 35,098
To storage for fuel usage: 0 to Storage for Injection:
35098
To storage for injection is included in Line 6 as subject to royalty.
Other: Hemlock Production Sold 109,979
I hereby certify that the foregoing is true and correct to the best of my knowledge.
`�
Signature � 4" Title
HILCORP ALASKA LLC
Lease Use
February 2015
each pool as a percent
T'i .,.,, �rpNl &.. o' Jwe.l_ 9Lee�
net.
lote: All volumes must be corrects,
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Name
6. Sold
175,389
7. Reinjected
0
8. Flared or vented 1 hour or less
386
9. Flared or vented more than 1 hour (see instr.)
73 9
10. Pilotand Purge
965
11. Assist Gas
0
12. Fuel gas used in lease operations
172,419
13. Other (see instructions)
14. TOTAL VOLUME (ITE 6.1 tr ._ 0 L
ncn
W R. U
0
349,232
15. NGL Gas Equivalent
925
16. Purchased gas - Rental Return Gas
205,971
17. Transferred from: (Off -lease Gas)
0
18. Transferred to:
(27,787)
19. Remarks:
Transferred to: Swanson Storage 27,787
To storage forfuel usage: 0 to Storage for Injection:
89842
To storage for Injection is included in Line 6 as subject to royalty.
Other: Hemlock Production Sold 87,057
1 hereby certify that the foregoing is true and correct
ttto�the best of my knowledge.
Signature �� Title Produ
>1 hr.
I. fav %^I •2,r
DECEIVED
MAR 2 3 2015
A®GCC
HILCORP ALASKA LLC I February 2015
nom multiple pools, list contribution of each pool as a percent of
Total Volume.
Use
tote: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
V7-
f- _
RECEIVED
MAR 2 3 2015
OR FLARING EVENTS GREATER THAN 1 HOUR
R tOate
O No
FacN' No
Date Flared
Start Time
ErWI Time
End Date
Planned
MCF
Descri tion of Flarin Event
Action Taken to Minimize
Volume
Excess flaring due to unscheduled
Excess Flaring necessary until
02/01/2015
124250
1330000002
2/1/2015
1:00.00 PM
4:00:00 PM
2/1/2015
U
68.5
maintenance in the Plant causing
maintenance could be
emergency shutdown.
completed.
Excess venting due to unscheduled
02101/2015
124250
1330000002
2/20/2015
3:30:00 PM
4:45:00 PM
2/20/2015
U
4.5
shutdown of Compressor K-22
Excess venting necessary until
because of high vapors from Tank 22
compressor could be loaded
which overloaded the compressor.
and restarted.
1330000002
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Swanson River
Swanson River Unit
6.
Sold
217,568
7.
Reinjected
0
8.
Flared or vented 1 hour or less
136
9.
Flared or vented more than 1 hour (see instr.)
865
10.
Pilot and Purge
1,967
11. Assist Gas
0
12.
Fuel gas used in lease operations
92,553
13.
Other (see instructions)
0
14.
TOTAL VOLUME (ITEMS 6.13)
313,089
15.
NGL Gas Equivalent
6,706-
,706-16.
16.
Purchased gas - Rental Return Gas
189,370
17.
Transferred tram: (Off -lease Gas)
0
18.
Transferred to:
(41,993)
Transferred to: Swanson Storage 41,993
To storage for fuel usage: 0 to Storage for Injection:
89842
To storage for injection is included in Line 6 as subject to royalty.
Other: Hemlock Production Sold 106,197
that the foregoing is true and correct to the best of my knowledge
Signature Zy"
HILCORP ALASKA LLC
from multiple pools, list r
Use
March 2015
ch pool as a percent
I . �f� ai e-- � � ( cLo e -
Note: All volumes must be correcte
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
. Facility Number
1330000002
2. Facility Name
Swanson River
3. Field
Swanson River Unit
4. Operator
I HILCI
Disposition
Volume MCF
20. For production from m
. Sold
217,566
Pool Name
. Reinjected
0
SWANSON RIVER, HI
SWANSON RIVER, HEM F/Sl
Flared Or vented 1 hour or less
136
SWANSON RIVER, TYONEI
SWANSON RIVER, BELUG
Flared or vented more than 1 hour (see instr.)
865'
SWANSON RIVER, STERi
0. Pilot and Purge
1,967
1. Assist Gas
0
2. Fuel gas used in lease operations
92,553
3. Other (see instructions)
p
Authorization>1 hr.
4. TOTAL VOLUME (ITEMS 6-13)
313,089
5. NGL Gas Equivalent
6. Purchased gas -Rental Return Gas +
=
953
189,370
Waste:
7. Transferred from: (Off -lease Gas)
0
O
/
B. Transferred to:
(41,993)
Analyst
9. Remarks:
Transferred to: Swanson Storage 41,993
To storage for fuel usage: 0 to Storage for Injection:
89842
To storage for inlecton is included in Line 6 as subject to royalty.
Other: Hemlock Production Sold 106,197
hereby certify that the foregooiinngg1 is true and correct to the best of my knowledge. D
Signature V-4- Title Production
RECEIVE®
APR 2 2 2015
A®GCC
as a
Safety
Lease Use l7
5-12- -1 J` -
lots: All volumes must be correcte,
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
VT -i
sl�,1i5
RECEIVED
APR 222015
OR FLARING EVENTS GREATER THAN 1 HOUR
I
Action Taken to Minimize
RiptDate
O No
FacllKvNo
Date Flared
Stan Time
Ending Time
End Dale
Planned
MCF
Description of Rating Event
Volume
Excess venting necessary until
0101=15
124250
1330000002
3/13/2015
3:15:00 PM
4:30:00 PM
3/23/2015
U
864,0
Excess venting due to Compressor K-
the cylinder liner could be
22 losing a cyclinder.
repaired, new piston machined
and installed.
Excess venting due to liquids
Excess venting necessary until
0301/2015
124250
1330000002
3/25/2015
4:00:00 PM
1130:00 PM
3/25/2015
P
1.0
unloading of Well 31-8 casioggasfor
liquids unloading complete
drilling.
and well brought backenline.
1330000002
6. Sold
7. Reinjected
8. Flared orvented 1 hourorless
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Assist Gas
12. Fuel gas used in lease operations
13. Other (see instructions)
14. TOTAL VOLUME (ITEMS 6.13)
15. NGL Gas Equivalent
16. Purchased gas - Rental Return Gas
17. Transferred from: (Off -lease Gas)
18. Transferred to:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Swanson River Swanson River Unit HILCORP ALASKA LLC April 2015
Volume MCF 20. For production from multiple pools, list contribution of each pool as a
233,908 of Total Volume.
Pool Name Pool Code 1
0 SWANSON RIVER, HEMLOCK 772100 f
758
407 1
1,356
0
82,862
0
319,291
5,642
191,914
0
(21,654)
Transferred to: Swanson Storage 21,654
To storage for fuel usage: 0 to Storage for Injection:
21654
To storage for injection is included in Line 6 as subject to royalty.
Other: Hemlock Production Sold 127,577
certity mat the foregoing is true and correct to the best of my knowledge.
Signature ` anZ�K" Title
Use
I. Pty. wPsa A a 0�0 -,-1 J4
Note: All volumes must be correcte
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Sold
. Reinjected
. Flared or vented 1 hour or less
Flared or vented more than 1 hour (see instr.)
0. Pilot and Purge
1. Assist Gas
2. Fuel gas used in lease operations
3. Other (see instruc5ons)
4. TOTAL VOLUME (ITEMS 6.13)
5. NGL Gas Equivalent
6. Purchased gas - Rental Returp G
7. Transferred from: (Off -lease Gas)
8. Transferred to:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
HILCORP
233,908
0
758
407'
1,356
0
82,862
0
MAY 27 2J
4 0G Z. G,
list contribution of each pool as a percent of
Authorization>1 hr Safety 7 bT
319,291
Lease Use
941
Conservation
s.` 191,914
Waste: 00 /
(21,654)
Transferred to: Swanson Storage 21,654
To storage for fuel usage: 0 to Storage for Injection:
21654
To storage for injection is included in Line 6 as subject to royally.
Other: Hemlock Production Sold 127,577
�S
I Note: All volumes must be corrected
Signature -`�`i �y� Title Production Analyst to pressure of14.65 psia and to a
temperature of 60o F. Authority 20
led Name Codnev Dver Phone 713-289-2881 Date 5/15/2n15 enr.Is Oso
iITL
1,15-1! s
GAS DISPOSITION IMPORT FORM FOR FLARING EVENTS GREATER THAN 1 HOUR
Action Taken to Minimize
R tDate
O No
FactiftyNct
Date flared
Start Time
Ending Time
End Date
Planned
MCF
Description of Flaring Event
Volume
Excess venting necessary until
maintenance could be
Excess venting due to unscheduled
04/01/2015
124250
1330000002
4/9/2015
8:45:00 AM
5:30:00 PM
4/11/2015
U
182.4
shutdown of Compressor K-22
completed and compressor
because of lost cylinder #1.
brought back online. Cylinder
head was made and
compressor repaired.
Excess venting necessary until
maintenance could be
Excess venting due to unscheduled
shutdown of Compressor N-22
completed and compressor
04/01/2015
124250
1330000002
4/11/2015
7:30:00 PM
2:00:00 PM
4/13/2015
U
137.0
brought back online. Cylinder
because of major cooling system
N2 was inspected and field
Issues.
found piston was damaged.
Pairs were ordered.
Excess flaring necessary until
04/01/2015
124250
1330000002
4/17/2015
9:30:00 AM
11:30:00 AM
4/17/2015
P
6.5
Excess venting due to shutdown of
maintenance could be
compressor K-22 for service to 20v-1.
completed and compressor
brought back online.
Excess flaring necessary until
04/01/2015
124250
1330000002
4/20/2015
1:00:00 AM
2:30:00 AM
4/20/2015
U
40.9
Excess flaring due to K-12 scrubber
valve could be located and
dump valve stuck open.
closed.
Excess venting due to unscheduled
Excess venting necessary until
04/01/2015
124250
1330000002
4/25/2015
9:30:00 PM
10:00:00 AM
4/26/2015
U
40.2
shutdown of Compressor K-22 for
repairs could be complete and
re pair of an impeller on circulation
compressor brought back
pump.
online.
x ' x
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
1330000002
2. Facility Name
Swanson River
3. Field
Swanson River Unit
4. Operator
HILCORP ALASKA LLC
5. Month/Yearof Disposition
May 2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent
of Total Volume.
6. Sold
281,067
Pool Name Pool Code Percent
7. Reinjected
0
SWANSON RIVER, HEMLOCK 772100 45.72%
SWANSON RIVER, HEM F/STERLING UNDEF 772105 0.00%
8. Flared or vented 1 hour or less
449
SWANSON RIVER, TYONEK UNDEFINED 772500 0.00%
SWANSON RIVER, BELUGA UNDEFINED 772520 0.00%
9. Flared or vented more than 1 hour (see instr.)
686
SWANSON RIVER, STERLING UNDEFINED 772550 54.28%
10. Pilot and Purge
1,820
11. Assist Gas
0
12. Fuel gas used in lease operations
79,998
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.13)
364,020
Lease Use
MCF
15. NGL Gas Equivalent
5,086 '
Conservation
MCF
16. Purchased gas - Rental Return Gas
163,621
Waste:
MCF
17. Transferred from: (Off -lease Gas)
0
Commissioner Date
18. Transferred to:
(93,576)
�• �la""� are
(J
19. Remarks:
Transferred to: Swanson Storage 93,576
To storage for fuel usage: 0 to Storage for Injection:
93576
To storage for injection is included in Line 6 as subject to royalty.
Other: Hemlock Production Sold 84,872
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be correcte
Signature e'Allic" Title Production Analyst to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
ted Name Cndnav Dver Phone 713-289-2881 Date 7/24/2017 AAC25.235.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Facility Name
. Sold
281,067
Poc
Reinjected
0
SWANSON F
SWANSON RIVER, 1 -
Flared or vented 1 hour or less
Flared
449
SWANSON RIVER
SWANSON RIVER
Flared or vented more than 1 hour (see instr.)
686'
SWANSON RIVER,
0. Pilot and Purge
1,820
1. Assist Gas
0
2. Fuel gas used in lease operations
79,998
3. Other (see instructions)
0
Authorization >1 hr:
4. TOTAL VUL.UME (ITEMS 6.13)
364,020
5. NGL Gas Equivalent
997
6. Purchased gas - Rental Return Gas
163,621
Waste:
7. Transferred from: (Off -lease Gas)
0
B. Transferred to:
(93,576)
9. Remarks:
Transferred to: Swanson Storage 93,576
To storage forfuel usage: 0 to Storage for Injection:
93576
To storage for injection is included in Line 6 as subject to royalty.
Other: Hemlock Production Sold 84,872
hereby certify that the foregoing// is true and correct to the best of my knowledge.
Signature Title Production Analyst
Printed Name Cortnev Dyer Phone 713-289-2881 Date
Use
MR
as a
1572%
0.00
0.00°/
!D -/-i S -
to pressure of 14.65 pale and to a
temperature of 60o F. Authority 20
VT I -
9/)F1 )5
OR FLARING EVENTS GREATER THAN 1 HOUR
Action Taken to Minimize
R tDater124250
Facit No
Date Flared
Start Time
EndingTime
End Date
Planned
MCF
Description of Flaring Event
Volume
Excess venting due to Compressor K-
22 down for repairs to cylinder #1.
Excess venting necessary until
05/01/2015
1330000002
5/2/2015
245:00 PM
1:00:00 PM
5/6/2015
U
309.9
Venting will be ongoing until repairs
repairs could be made.
are made.
Excess venting necessary until
Excess venting due to scheduled
05)01/2015
1330000002
5/8/2015
8:15:00 AM
12:45:00 PM
5/8/2015
P
15.3
maintenance on Compressor K-22 to
maintenance could be
completed and compressor
install compressor thermowells.
restarted.
Excess flaring necessary until
Excess flaring due to 1-27 tank setting
0501/2015
124250
1330000002
5/11/2015
6:00:00 AM
8:00:00 AM
5/11/2015
U
42.2
the tank could be shut in and
vessle gassing threw adump valve.
ixed.
Excess venting due to a leaky valve on
Excess venting necessary until
05101/2015
124250
1330000002
5/22/2015
9:00:00 AM
12:00:00 PM
5/22/2015
U
239.6
the 1903 PSV. Repair parts were
grease could be pumped into
ordered.
thevalvle.
Excess venting due to unscheduled
shutdown of Compressor K-22
Excess venting necessary until
05101/2016
124250
1330000002
5/24/2015
9:00:00 AM
1100:00 AM
5/24/2015
U
7.0
compressor could be loaded
because of high vapors from Tank 22
which overl oaded the compressor.
and restarted.
Excess venting due to shutdown of
Excess venting necessary until
Compressor K-22 caused by high
05/07/2075
124250
1330000002
5/30/2015
3:00:00 PM
6:30:00 PM
5/30/2015
U
13.0
the compressor cooled and
ambiant temperature causing
restarted.
Common temperature shut down.
Excess venting necessary until
Excess venting due to a power outage
05/01/2015
124250
1330000002
5/31/2015
7:15:00 AM
9:30:00 AM
5/31/2015
U
12.5
which caused the unavoidable
power could be restored and
shutdown of Compressor K-22.
Compressor could be brought
back online.
Excess flaring necessary until
Excess flaring due to a power outage
power could be restored and
05/01/2015
124250
1330000002
5/31/2015
7:15:00 AM
10:30:OOAM
5/31/2015
U
15.3
which caused the unavoidable
shutdown of Compressor K-8.
Compressor could be brought
hack online.
Excess venting due to high
Excess venting necessary until
05012015
124250
1330000002
5/31/2015
7:15:00 AM
10:00:00 PM
5/31/2015
U
31.2
temperature shutdown of
the compressor cooled and
Compressor K-22.
restarted.
,:�eZ)e-gA-
OR FLARING EVENTS GREATER THAN i HOUR
Action Taken to Minimize
R fDi
Casio
Facir No
Date Flared
Stan Time
Ending Tune
End Date
Planned
MCF
Description of Flarin Event
Volume
Excess venting due to Compressor K-
22 down for repairs to cylinder Nl.
Excess venting necessary until
05/01/2015
124250
1330000002
5/2/2015
7:45:00 PM
1:00:00 PM
5/6/2015
U
309.9
Venting will be ongoing until repairs
repairs could be made.
are made.
Excess venting necessary until
Excess venting due to scheduled
05/01/2015
124250
1330000002
5/8/2015
8:15:00 AM
12:45:00 PM
5/8/2015
P
15.3
maintenance on Compressor K-22 to
maintenance could be
completed and compressor
Install compressor thefmowells.
restarted.
Excess flaring necessary until
Excess flaring due to l-27 tank setting
xcess wringgassidue to 1a7 tankmp
05/01/2015
124250
1330000002
5/11/2015
6:00:00 AM
8:00:00 AM
5/11/2015
U
42.2
the tank cou Id be shut in and
vesfixed.
Excess venting due to a leaky valve on
Excess venting necessary until
05/01/2015
124250
1330000002
5/22/2015
9:00:00 AM
12:00:00 PM
5/22/2015
U
239.6
the 1901 PSV. Repair parts were
grease could be pumped into
ordered.
thevalvle.
Excess venting due to unscheduled
Excess venting necessary until
shutdown of Compressor K-22
05/01/2015
124250
1330000002
5/24/2015
9:00:OOAM
11:00:OOAM
5/24/2015
U
7.0
compressor could be loaded
because of high vapors from Tank 22
which overloaded the compressor.
and restarted.
Excess venting due to shutdown of
Excess venting necessary until
Compressor K-22 caused by high
05/01/2015
124250
1330000002
5/30/2015
3:00:00 PM
6:30:00 PM
5/30/2015
U
13.0
the compressor cooled and
ambient temperature causing
Common temperature shut down.
restarted.
Excess venting necessary until
Excess venting due to a power outage
power could be restored and
05/01/2015
124250
1330000002
5/31/2015
7:15:OOAM
9:30:00 AM
5/31/2015
U
12.5
which caused the unavoidable
Compressor could be brought
shutdown of Compressor K-22.
back online.
Excess flaring necessary until
Excess flaring due to a power outage
power could be restored and
05/01/2015
124250
1330000002
5/31/2015
7:15:00 AM
10:30:OOAM
5/31/2015
U
15.3
which caused the unavoidable
Compressor could be brought
shutdown of Compressor K-8.
back online.
Excess venting due to high
Excess venting necessary until
05/01/2015
124250
1330000002
5/31/2015
7:15:OOAM
10:00:00 PM
5/31/2015
U
31.2
temperature shutdown of
the compressor cooled and
Compressor K-22.
restarted.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1.
Facility Number
1330000002
2. Facility Name
Swanson River
3. Field
Swanson River Unit
4. Operator
HILCORP ALASKA LLC
5. Month /Vear of Disposition
June 2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution
of Total Volume.
of each pool as a percent
6.
Sold
232,203
Pool Name
Pool Code Percent
7.
Reinjected
0
SWANSON RIVER, HEMLOCK
772100 53.15%
SWANSON RIVER, HEM FISTERLING UNDEF
772105 0.00%
8.
Flared or vented 1 hour or less
78
SIMANSON RIVER, TVONEK UNDEFINED
772500 0.28%
SWANSON RIVER, BELUGA UNDEFINED
772520 0.00%
9.
Flared or vented more than 1 hour (see instr.)
635%
SWANSON RIVER, STERLING UNDEFINED
772550 46.56%
10.
Pilot and Purge
1,389
11. Assist Gas
0
12. Fuel gas used in lease operations
79,035
13.
Other (see instructions)
0
Official Use Only
Authorization >t hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.13)
313,340
Lease Use
MCF
15. NGL Gas Equivalent
6,791 -
Conservation
MCF
16.
Purchased gas -Rental Return Gas
-
163,929
Waste:
MCF
17.
Transferred from: (Off -lease Gas)
0
Commissioner
Date
18.
Transferred to:
(45.818)
l•
19. Remarks:
Transferred to: Swanson Storage 45,818
To storage for fuel usage: 0 to Storage for Injection:
45818
To storage for injection is included in Line 6 as subject to royalty.
Other: Hemlock Production Sold 97,885
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be correcte
Signature �,ott+sc� ��-�^ Title Production Analyst to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Cortnev Over Phone 713 -2R9 -2R81 Date 7%4/2n17 AAC25.235.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
1. Facility Number
1330000002
2. Facility Name
Swanson River
3. Field 4. Operator
Swanson River Unit HILCORP ALASKA LLC
Disposition
5. Month/Year o'0p
June 2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
232,203
Pool Name Pool Code Percent
7. Reinjected
0
SWANSON RIVER, HEMLOCK 772100 53.15%
SWANSON RIVER, HEM FISTERLING UNDEF 772105 0.00%
8. Flared or vented 1 hour or less
78
SWANSON RIVER, TYONEK UNDEFINED 772500 0.28%
SWANSON RIVER, BELUGA UNDEFINED 772520 0.00%
9. Flared or vented more than 1 hour (see instr.)
635
SWANSON RIVER, STERLING UNDEFINED 772550 46.56%
10. Pilot and Purge
1,389
11. Assist Gas
0
12. Fuel gas used in lease operations
79,035
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.13)
313,340
Lease Use
MCF
15. NGL Gas Equivalent
1,241
Conservation
MCF
16. Purchased gas - Rental Return Gas
163,929
Waste:
MCF
17. Transferred from: (Off -lease Gas)
0
R� ./ c? -2—
Com Issioner Date
18. Transferred to:
(45,818)
Transferred to: Swanson Storage 45,818
To storage for fuel usage: 0 to Storage for Injection:
45818
To storage for injection is included in Line 6 as subject to royalty.
Other: Hemlock Production Sold 97,885
hereby certify that the foregoing is true and correct to the best of my knowledge.
�". " "" Note: All volumes must be corrected
Signature l� rw.iurc/ D�� Title Production Analyst to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Cortnev Dver Phone 713-289-2881 Date 7/20/2015 AAC25.235.
V%I—
Yl-z�15
OR FLARING EVENTS GREATER THAN 1 HOUR
Acllon Taken to Minimize
R oste O No Facilil No Date Flared Start Time Ending Time End Date Planned MCF Description of Flaring Event Volume
Excess venting due to unscheduled
Excess venting necessary until
06/01/2015
124250
1330000002
6/13/2015
4:00:00 PM
7:00:00 PM
6/13/2015
U
10.8
shutdown of Compressor K-22
compressor could be cooled
caused by high temperature issues.
and restarted.
Excess venting due to unscheduled
Excess venting necessary until
06/01/2015
124250
1330000002
6/14/2015
1:30:00 PM
8:30:00 PM
6/14/2015
U
24.5
shutdown of Compressor K-22 caused
the compressor could be
by overheating.
cooled and restarted.
Excess venting due to high
Excess venting necessary until
06/01/2015
124250
1330000002
6/15/2015
11:30:00 AM
5:00:00 PM
6/15/2015
U
19.6
temperature shutdown of
the compressor cooled and
Compressor K-22.
restarted.
Excess flaring due to multiple high
Excess flaring necessary until
06/01/2015
124250
1330000002
6/15/2015
5:45:00 PM
10:45:00 PM
6/15/2015
U
58.9
temperature shutdowns of
the compressor could cool
Compressor K-8.
down and restarted.
Excess venting due to high
Excess venting necessary until
06/01/2015
124250
1330000002
6/15/2015
6:00:00 PM
11:00:00 PM
6/15/2015
U
17.7
temperature shutdown of
the compressor cooled and
Compressor K-22.
restarted.
Excess venting due to high
Excess necessary until
8:00:00 PM
6/16/2015
U
39.3
compressor cylinder temperatures
comprventing
ooled
the compressor cooled and
06/01/2015
124250
1330000002
6/16/2015
9:00:00 AM
caused by high ambient temperature
restarted.
and Compressor K-22 shutdown.
Excess flaring due to high jacket
Excess flaring necessary until
8:00:00 PM
6/16/2015
U
103.1
water temperatures and low oil
the compressor cooled and
06/01/2015
124250
1330000002
6/16/2015
10:30:00 AM
pressure caused by high ambient
restarted.
temperature.
Excess venting due to unscheduled
Excess venting necessary until
06/01/2015
124250
1330000002
6/17/2015
3:30:00 AM
8:00:00 PM
6/19/2015
U
228.7
shutdown of Compressor K-22 caused
the mechanics can replace the
by Comp cylinder N1 going out.
cylinder and complete repairs.
Excess flaring due to high jacket
Excess flaring necessary until
06)01/2015
124250
1330000002
6/17/2015
1115:00 AM
11:15:00 PM
6/17/2015
U
121.7
water and compressor temperature
caused from high ambient
compressor could be cooled
and restarted.
temperatures.
Excess venting due to blow down of
Excess venting necessary until
06/01/2015
124250
1330000002
6/27/2015
3:05:00 AM
4:35:00 AM
6/27/2015
P
2.9
production casing from 95psi to
blow down could be
45psi.
completed.
Excess venting due to unscheduled
Excess venting necessary until
06/012015
124250
1330000002
6/28/2015
11:45:OOAM
2:00:00 PM
6/28/2015
U
7.9
shutdown of Compressor K-22 caused
the compressor could be
by high temperatures.
loaded and restarted.
I ,/ x
PA
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Assist Gas
12. Fuel gas used in lease operations
13. Other (see instructions)
14. TOTAL VOLUME (ITEMS 6.13)
15. NGL Gas Equivalent (mcf)
16. Purchased gas - Rental Return Gas
17. Transferred from: (OH -lease Gas)
18. Transferred to:
SOLD SRU Field to Ensue (royalty -bearing)
SRU Field to Enstar (Hemlock Noo-royaky)
SRU b Storage (royalty- bearing)
SRU to Storage (Hemlock Norfroyalty)
Field
226,333
0
40
289 1
1,216
0
81,933
0
309,811
6,707
475,537
0
(27,765)
95,301
103,267
13,325
14,440
For production from multiple pools, list
>1
Use
TRANSFERRED TO Incl. Line 6 SolNlnj to Storage
1• Floe, 1 ¢rip""A o. CK 3
l
as a percent
27,765
certify that the foregoing is true and correct to the best of my knowledge.
�e Note: All volumes must be correcte,
Signature Title Production Analyst to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
led Name r:nrinev Dve.r Phone 713-289-2881 Date 9115120171 AAC25.235.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
1330000002
2. Facility Name
Swanson River
3. Field
Swanson River Unit
4. Operator
HILCORP ALASKA LLC
5. Month7Year of 20Disposition
Jul 15
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
226,333
Pool Name Pool Code Percent
7. Reinjected
0
SWANSON RIVER, HEMLOCK 772100 53.67%
SWANSON RIVER, HEM F/STERLING UNDEF 772105 0.00%
S. Flared or vented 1 hour or less
40
SWANSON RIVER, TVONEK UNDEFINED 772500 0.00%
SWANSON RIVER, BELUGA UNDEFINED 772520 0.00%
9. Flared or vented more than 1 hour (see instr.)
289
SWANSON RIVER, STERLING UNDEFINED 772550 46.33%
10. Pilot and Purge
1,216
11. Assist Gas
0
12. Fuel gas used in lease operations
81,933
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr
Safety
p
z `
MCF
14. TOTAL VOLUME (ITEMS 6-13)
309,811
Lease Use
MCF
15. NGL Gas Equivalent
1,380
Conservation
MCF
16. Purchased gas- Rental Return Gas
161,120
Waste:
MCF
17. Transferred from: (Off -lease Gas)
0
: / ZJ - 2 - /S
ommisswner Date
18. Transferred to:
(27,765)
Transferred to: Swanson Storage 27,765
To storage for fuel usage: 0 to Storage for Injection:
27765
To storage for injection is included in Line 6 as subject to royalty.
Other: Hemlock Production Sold 103,267
certify that the foregoing is true •anorreec-t to the best of my knowledge.
Signature 1..� //L/Q/2� Title PTodu
tPfl NPTP r.nrtnPV DVPr phnnA 715-%
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
v T f--
klzl1 S
OR FLARING EVENTS GREATER THAN 1 HOUR
Action Taken to Minimize
RptDaho
O No
FacilityNo
Date Flared
Start Time
Ending Time
End Date
Planned
MCF
Description of Flaring Event
Volume
Excess venting due to unscheduled
0])01/2015
124250
1330000002
7/1/2015
7:30:00 PM
10:00:00 AM
7/2/2015
U
52.8
shutdown of Compressor K-22 caused
Excess venting necessary until
maintenance could be
by high temperature and high
vibration.
completed.
Excess venting due to unknown
07/0112015
124250
1330000002
7/3/2015
11:00:0GAM
2:00:00 PM
7/3/2015
U
10.9
reasons, mechanic was contacted and
Ex cess venting necessary until
compressor could be restarted.
compressor restarted.
Excess flaring due to high
Excess flaring necessary until
07/01/2015
124250
1330000002
7/3/2015
5:30:00 PM
7:45:00 PM
7/3/2015
U
19.7
temperature shutdown of
temperatures could be lowered
Compressor K-8.
and compressor brought back
online.
Excess venting due to 2-15 and 1-27
07/01/2015
124250
1330000002
7/7/2015
12:00:00 PM
2:00:00 PM
7/7/2015
P
1.5
tank settings lined to gauge tanks to
Ezcess venting necessary until
flush north oil line.
tank gauging complete.
Excess venting due to scheduled
07/01/2015
124250
1330000002
7/10/2015
10:00:00 AM
1:00:00 PM
7/10/2015
P
20
maintenance to flush lined fluid out
Excess venting necessary until
lined fluids could be brought
of 1-27 TS and 2-15 TS between 1-27
back to oil line after flush job.
TS and 1-33 T5.
Excess flaring due to shutdown of
Excess flaring necessary until
07/01/2015
124250
1330000002
7/12/2015
1:00:00 PM
4:30:00 PM
7/12/2015
P
572
Compressor K-8 for scheduled
maintenance could be
maintenance to figure out low oil
completed and compressor
pressure problem.
brought back online.
Excess venting due to bleed down
Excess venting necessary until
07/01/2015
124250
1330000002
7/12/2015
1:30:00 PM
3:30:00 PM
7/12/2015
P
9.0
Wells 31-8 and 32-8 production
the bleeding could be complete
casings.
and bleed valves shut.
Excess venting due to bleed down
Excess venting necessary until
07/01/2015
124250
1330000002
7/13/2015
1:15:00 PM
2:30:00 PM
7/13/2015
P
10.0
Wells 31.8 and 32-8 production
the bleeding could be complete
casings.
and bleed valves shut.
Excess venting due to unscheduled
shutdown of Compressor K-22 on
until
WI01/2015
124250
1330000002
7/16/2015
3:00:00 AM
7:00:00 AM
7/16/2015
U
11.8
the
the governor could be replaced
governor could be
overspeeding caused by a bad
and compressor restarted.
governor.
Excess venting due to scheduled
Excess venting necessary until
07/01/2015
124250
1330000002
7/23/2015
8:00:00 AM
3:45:00 PM
7/23/2015
P
14.0
shutdown of the K-22 Compressor for
maintenance was completed
and compressor loaded and
repair and maintenance.
restarted.
Excess flaring necessary until
flaring shutdown of
Eompressor
07/01/2015
124250
1330000002
7/23/2015
9:00:00 AM
3:00:00 PM
7/23/2015
P
50.2
cxcess
Compressor caused by shutdown OfK
aused f K
repairs to K-22 Compressor
22 Compressor for maintenance.
were complete and both units
loaded and restarted.
OR FLARING EVENTS GREATER THAN i HOUR
Action Taken to Minimize
R tDate
O No
Facilftylso,
Date Flared
Start Time
Ending Tim
End Date
Punned
MCF
Description of Flaring Event
Volume
Excess venting due to unscheduled
shutdown of Compressor K-22 for
Excess venting necessary until
07/01/2015
124250
1330000002
7/24/2015
7:30:00 AM
10:30:00 AM
7/24/2015
U
13.0
repairs made to starting panel and N2
repair were complete and
compressor brought back
compressor cylinder head
temperature probe.
online.
Excess venting due to shutdown of
Excess venting necessary until
07/01/2015
124250
1330000002
7/25/2015
3:30:00 AM
7:30:00 AM
7/25/2015
U
18.1
Compressor K-22 caused by low
the compressor could be
trouble shot and compressor
engine oil pressure.
loading and restarted.
Excess flaring due to unscheduled
sa
Exess flaring necessary until
07/01/2015
124250
1330000002
7/29/2015
1:15:00 PM
2:45:00 PM
7/29/2015
U
11.3
shutdown of Compressor K-8 caused
compressor could loaded
by high discharge pressure from Field
150.
and restarted.
Excess venting due to unscheduled
shutdown of Compressor K-22 caused
Excess venting necessary until
07/01/2015
124250
1330000002
7/31/2015
7:00:00 PM
9:00:00 PM
7/31/2015
U
7:3
the compressor could be
and high
by higscharg
pressature
discharge pressure.
loaded and restarted.
Name
3. Sold
7. Reinjected
3. Flared or vented 1 hour or less
3. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Assist Gas
12. Fuel gas used in lease operations
13. Other (see instructions)
14. TOTAL VOLUME (ITEMS 6-13)
15. NGL Gas Equivalent (mcf)
16. Purchased gas - Rental Return Gas
17. Transferred from: (Off -lease Gas)
18. Transferred to:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SOLD SRU Field to Emlar(royally-beadrg)
SRU Field to Easter (Hemlock NorHroyafty)
SRU to Storage (royalty- bearing)
SRU to Storage (Hemlock NorFroyally)
Field
208,043
0
17
339 t
1,272
0
81,489
0
Official
Authorization >1 hr:
291,160
FLee
6,787
475.537'
Waste:
0
(18.017)
certify that the foregoing is true and correct to the best of my knowledge.
Signature 6-7At./Y(1/ 4-4 Title
86,720 TRANSFERRED TO Incl. Late 6 Sold/Inj to Storage
103,306 pe o1 p,n 0rki a
8,221 )' %tpr ✓�� �\ U
9,796
re4 1
as a
18,017
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see inslr.)
10. Pilot and Purge
11. Assist Gas
12. Fuel gas used in lease operations
13. Other (see instructions)
14. TOTAL VOLUME (ITEMS 6-13)
15. NGL Gas Equivalent
16. Purchased gas - Rental Return Gas
17. Transferred from: (Off -lease Gas)
18. Transferred to:
Transferred to:
Other:
certify that the foregoing is
Signature
Name
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Swanson Storage Storage 18,714
To storage for fuel usage: a to Storage for Injection:
18714
To storage for injection is included in Line 6 as subject to myalty.
Hemlock Production Sold
1d correct to the best of my knowledge
as a
339
Note: All volumes must be correcte
to pressure of 14.65 pale and to a
temperature of 60o F. Authority 20
1�L
Volume MCF
20. For production from multiple pools, list
Total Vc
208,043
Pool Name
0
SWANSON RIVER, HEMLOCK
SWANSON RIVER, HEM F/STERLING UNDEF
17
SWANSON RIVER, TYONEK UNDEFINED
SWANSON RIVER, BELUGA UNDEFINED
339
SWANSON RIVER, STERLING UNDEFINED
1,272
0
81,489
0
Official U:
Authorization >1 hr
Safety
291,160
Lease Use
1,396
Conservation
158,288
Waste:
0
n
/
(18714)
Swanson Storage Storage 18,714
To storage for fuel usage: a to Storage for Injection:
18714
To storage for injection is included in Line 6 as subject to myalty.
Hemlock Production Sold
1d correct to the best of my knowledge
as a
339
Note: All volumes must be correcte
to pressure of 14.65 pale and to a
temperature of 60o F. Authority 20
1�L
OR FLARING EVENTS GREATER THAN 1 HOUR
Action Taken to Minimize
RpitDaa
O No
FacilityNo
Date Flared
Start Time
Ending Time
End Date
Planned
MGF
Description of Flaring Event
Volume
Excess flaring due to unscheduled
08/01/2015
124250
1330000002
8/3/2015
10:30:00 PM
11:59:00 PM
8/3/2015
U
14.2
shutdown K-22 caused
Excess flaring necessary until
compressor K-22 timer issues
time
by timer issues which led to
Compressor K-8 shutdown.
fixed.
Excess venting due to high
Excess venting necessary until
08/01/2015
124250
1330000002
8/4/2015
1:00:00 AM
5:45:00 AM
8/4/2015
U
17.4
temperature shutdown of
the compressor could be
Compressor K-22.
cooled, loaded, and restarted.
Excess flaring due to high
Excess flaring necessary until
08N1/2015
124250
1330000002
8/4/2015
2:30:00 AM
6:00:00 AM
8/4/2015
U
18.3
temperature shutdown of
the compressor could be
Compressor K-8.
cooled, loaded, and restarted.
Excess venting due to unscheduled
Excess venting necessary until
08/01/2015
124250
1330000002
8/7/2015
4:30:00 PM
7:00:00 PM
8/7/2015
U
9.1
shutdown of Compressor K-8 which
compressors could be
caused Compressor K-22 to go down.
restarted.
Excess flaring due to unscheduled
Excess flaring necessary until
08/01/2015
124250
1330000002
8/7/2015
4:30:00 PM
7:00:00 PM
8/7/2015
U
23.3
shutdown of Compressor K-8 caused
compressor could be cooled
by over heating.
and restarted.
Excess flaring due to shutdown of
Excess flaring necessary until
08101/2015
124250
1330000002
8/9/2015
7:00:00 AM
9:15:OOAM
8/9/2015
p
13.9
Compressor K-8 to replace a bad
maintenance could be
completed and compressor
valve.
brought back online.
Excess venting due to shutdown of
08/01/2015
124250
1330000002
8/9/2015
7:45:00 AM
9:30:00 AM
8/9/2015
P
6.5
Compressor K-22 caused by
maintenance on Compressor K-
8 could be completed and both
Compressor K-8 bei ag down for
maintenance.
compressor brought back
Excess venting due to unscheduled
Excess venting necessary until
OIA1112015
124250
1330000002
8/11/2015
4:30:00 PM
7:30:00 PM
8/11/2015
U
11.1
shutdown of Compressor K-22 caused
temperature could be lowered
by high common temperature.
and compressor restarted.
Excess venting due to scheduled
Excess venting necessary until
08/01/2015
124250
1330000002
8/13/2015
11:30:00 AM
1:30:00 PM
8/13/2015
p
83
shutdown of Compressor K-22 for
maintenance could be
preventative maintenance to change
completed and compressor
the oil and spark plugs.
brought back online.
Excess flaring due to high compressor
Excess flaring necessary until
08/01/2015
124250
1330000002
8/25/2015
9:00:00 AM
1:30:00 PM
8/25/2015
U
40.6
temperature shutdown of
the compressor could be
Compressor K-8.
cooled, loaded, and restarted.
Excess venting due to high common
Excess venting necessary until
08/01/2015
124250
1330000002
8/25/2015
5:15:00 PM
11:59:00 PM
8/25/2015
U
24.3
temperature shutdown of
the compressor could be
Compressor K-22.
cooled, loaded, and restarted.
Excess flaring due to scheduled
Excess flaring necessary until
08/01/2015
124250
1330000002
8/26/2015
7:00:00 AM
9:30:00 AM
8/26/2015
P
19.2
shutdown of Compressor K-8 for
maintenance could be
maintenance to install new valves and
completed and compressor
new AMOT.
restarted.
OR FLARING EVENTS GREATER THAN i HOUR
-
Action Taken to Minimize
R Date
O No
Faoili No
Date Flared
Start Time
EndingTime
End Date
.Planned
MCF
Desorption of Flaring Event
Volume
Excess venting due to unscheduled
08/01/2015
124250
1330000002
8/26/2015
10:00:00 AM
10:00:00 PM
8/26/2015
U
44.1
shutdowns of Compressor K-22
Excess venting
Excess venting necessary until
ssor could bssary restarted.
caused by overheating issues.
Excess flaring necessary until
Excess flaring due to shutdown of
08/01/2015
124250
1330000002
8/27/2015
7:00:OOAM
11:30:00 AM
8/27/2015
P
42.6
Compressor K-8 to change
maintenance could be
completed and compressor
compressor rings.
brought back online.
Excess venting due to unscheduled
Excess venting necessary until
08/01/2015
124250
1330000002
8/27/2015
7:30:OOAM
1:30:00 PM
8/27/2015
U
22.3
shutdown of Compressor K-22 for
compressor could be cooled,
high common temperature.
loaded and restarted.
Excess venting due to unscheduled
Excess venting necessary until
08/012015
124250
1330000002
8/28/2015
6:30:00 AM
8:00:OOAM
8/28/2015
U
5.5
shutdown of Compressor K-22 caused
compressor could be cooled,
by high common temperature.
loaded and restarted.
Excess venting due to unscheduled
Excess venting necessary until
08/01/2015
124250
1330000002
8/30/2015
11:45:00 AM
4:45:00 PM
8/30/2015
U
18.3
shutdown of Compressor K-22 caused
the compress or couldbe
by high common temperature.
cooled, laadedand restarted.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACII ITV RFPr1RT nF PRr1nIICFn r:AR nimionSITVIN
rev �
1.
Facility Number
1330000002
2. Facility Name
1 Swanson River
3. Field
Swanson River Unit
4. Operator
I HILCORP ALASKA LLC
5. Month/Year of Disposition
I September 2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution
of Total Volume.
of each pool as a percent
6.
Sold
196,446
Pool Name
Pool Code Percent
7.
Reinjected
0
SWANSON RIVER, HEMLOCK
772100 52.57%
SWANSON RIVER. HEM F/STERLING UNDEF
772105 0.00%
8.
Flared or vented 1 hour or less
3
SWANSON RIVER, TYONEK UNDEFINED
772500 0.62%
SWANSON RIVER. BELUGA UNDEFINED
772520 0.00%
9.
Flared or vented more than 1 hour (see inslr.)
1,387 it
SWANSON RIVER, STERLING UNDEFINED
772550 46.81%
10.
Pilot and Purge
2,461
11.
Assist Gas
0
12. Fuel gas used in lease operations
65,621
13.
Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-13)
285,918
Lease Use
MCF
15. NGL Gas Equivalent (mcf)
7,094 •
Conservation
MCF
16.
Purchased gas -Rental Return Gas
146,146
Waste:
I
MCF
17.
Transferred from: (Off -lease Gas)
0
Commissioner
Date
18.
Transferred to:
(41.071)
19.
Remarks:
SOLD SRU Field to Enstar (royalty -bearing)
SRU Field to Enstar (Hemlock Non -royalty)
SRU to Storage(myalty- bearing)
SRU to Storage (Hemlock Non -royalty)
75,959
79,416
20,074
20,997
TRANSFERRED TO Incl. Line 6 Sold4nj to Storage 41,071
I
(•Fi��r^� X11, ]Pe✓ t'vl" cti e113h�`
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature-oA++�� ��-u
Printed Name Cortne Der
-
Note: All volumes must be corrected
Title Production Anal st to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Phone 713-289-2881 Date 10/13/2017 AAC25.235.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
1330000002
6. Sold
196,446
7. Reinjected
0
8. Flared or vented 1 hour or less
3
9. Flared or vented more than 1 hour (see instr.)
1,387
10. Pilot and Purge
2,461
11. Assist Gas
0
12. Fuel gas used in lease operations
85,621
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6-13)
285,918
15. NGL Gas Equivalent
1,262
16. Purchased gas - Rental Return Gas
0
17. Transferred from: (Off -lease Gas)
0
illi. Transferred to:
(44,440)
Transferred to: Swanson Storage 44,440
To storage for fuel usage: 0 to Storage for Injectwn'.
44440
To storage for injection is included in Line 6 as subject to royalty.
Other: Hemlock Production Sold
the foreooine is true and correct to the best of my knowledge
Signature Title Production An
ted Name Cortnev Dver Phone 713-289-2881
Use
as a
/30
!0 -Z -9-/s
Date
Note: All volumes must be corrected
to pressure of 14.65 Pala and to a
10/20/2015 temperature of 60o F. Authority 20
vT�
Swanson River
Action Taken to Mm m¢e
RptDate
O No
Facilg No
Date Flared
Start Time
EndlimiTime,
End Date
planned
MCF
Description of Flaring Event
Volume
Excess venting due to unscheduled
Excess venting necessary until
09/0112015
124250
1330000002
9/4/2015
9/4/201521:30
9/4/201523:59
9/4/2015
U
10.7
shutdown of Compressor K-22 caused
temperature could be lowered
by high common temperature.
and compressor restarted.
Excess venting due to unscheduled
Excess venting necessary until
09/01/2015
124250
1330000002
9/5/2015
9/5/20151:30
9/5/20154:30
9/5/2015
U
11.7
shutdown of Compressor K-22 caused
temperature could be lowered
by high common temperature.
and compressor restarted.
Excess venting necessary until
Excess venting due to unscheduled
maintance on valve covers
09/01/2015
124250
1330000002
9/5/2015
9/5/2015 7:30
9/5/201513:30
9/5/2015
U
21.4
shutdown of Compressor K-22 for
could be completed and
repairs.
compressor brought back
online.
Excess venting necessary until
Excess venting due to unscheduled
maintance on valve covers
09/01/2015
124250
1330000002
9/5/2015
9/5/201515:00
9/5/2015 19:00
9/5/2015
U
17.5
shutdown of Compressor K-22 for
could be completed and
repairs.
compressor brought back
online.
Excess venting necessary until
Excess venting due to shutdown of
new VRU installation project
09/01/2015
124250
1330000002
9/14/2015
9/14/20158:00
9/30/201523:59
9/30/2015
P
1325.7
Compressor K-22 for installation of a
can be completed and
replacement VRU.
compressor brought back
online.
1387.0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 12. Facility Name 13. Field 4.
6.
Sold
267,908
7.
Reinjected
0
8.
Flared or vented 1 hour or less
52
9.
Flared or vented more than 1 hour (see instr.)
2,136
10.
Pilot and Purge
3,176
11. Assist Gas
0
12. Fuel gas used in lease operations
86,828
13.
Other (see instructions)
0
14.
TOTAL VOLUME (ITEMS 6.13)
360,100
15.
NGL Gas Equivalent (mcf)
4,197
16.
Purchased gas - Rental Return Gas
133,875
17.
Transferred from: (Off -lease Gas)
0
18.
Transferred to:
(33,288)
Transferred to: Swanson Storage for Injection Total
33,288
' Volume in Line 6 subject to royalty.
20,915
' Volume NOT subject to royalty (Hemlock H).
12,373
Rental Return: Hemlock Production Sold - To Enstar
87,228
Included in Line 6; NOT subject to royalty.
I the foregoing is true and correct to the best of my knowledge
Signature .01 -or Title
20. For production from multiple pools, list contribution of each pool as a percent
VER.HEMLOCK
=M F/STERLING
TYONEK UNDEF
Use
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
6. Sold
267,908
7. Reinjected
0
8. Flared or vented 1 hour or less
52
9. Flared or vented more than 1 hour (see instr.)
2,136
10. Pilot and Purge
3,175
11. Assist Gas
0
12. Fuel gas used in lease operations
86,828
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6.13)
360,099
15. NGL Gas Equivalent
1,071
16. Purchased gas - Rental Return Gas
p
17. Transferred from: (Off -lease Gas)
0
18. Transferred to:
(36,621)
19. Remarks
Transferred to: Swanson Storage 36,621
To storage for fuel usage: 6 to Storage ror Injection:
36621
To storage for injection is included in Line 6 as subject to royalty.
Other: Hemlock Production Sold 87,228
the foregoing is true and correct to the best of my knowledge
Unit
production from
4—
Use
pool as a
; 13�,
/:2 -/6 -/s
Signature
����" I Note: All Volumes must be corrects
7r — Title Production Analyst toressure of 14.65
p psia and to a
fad Name Cnnnnv n.,er ..�_ _ _ _ ,....,.._ __ _
temperature of 60o F. Authority 20
VT
Swanson River
Excess venting due to unscheduled
Excess venting necessary until
10/01/2015
124250
1330000002
10/1/2015
0:00:00
15:30:00
10/25/2015
P
2088.9
shutdownof Compressor K-22 caused
temperature could be lowered
by high common temperature.
and compressor restarted.
Excess venting due to unscheduled
Excess venting necessary until
10/91/2015
124250
1330000002
10/26/2015
12:00:00
15:00:00
10/26/2015
U
26.3
shutdown of Compressor K-22 caused
tem perature could be lowered
by high common temperature.
and compressor restarted.
Excess venting necessary until
Excess venting due to unscheduled
maintance on valve covers
10/91/2015
124250
1330000002
10/26/2015
14:00:00
16:45:00
10/26/2015
U
9.7
shutdown of Compressor K-22 for
could be completed and
repairs.
compressor brought back
online.
Excess venting necessary until
Excess venting due to unscheduled
maintance on valve covers
10/912015
124250
1330000002
10/30/2015
2:15:00
3:30:00
10/30/2015
U
11.0
shutdown of Compressor K-22 for
could be completed and
repairs.
compressor brought back
online.
2136.0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Name
6.
Sold
289,493
7.
Reinjected
0
8.
Flared or vented 1 hour or less
167
9.
Flared or vented more than 1 hour (see instr.)
2,371
10.
Pilot and Purge
1,035
11. Assist Gas
0
12.
Fuel gas used in lease operations
82,019
13.
Other (see instructions)
0
14.
TOTAL VOLUME (ITEMS 6-13)
375,085
15,
NGL Gas Equivalent (mct)
3,649
16.
Purchased gas - Rental Return Gas
118,878
17.
Transferred from: (Off -lease Gas)
0
18.
Transferred to:
(203 008)
Transferred to: Swanson Storage for Injection Total
Volume in Line 6 subject to royalty.
Volume NOT subject to royalty, (Hemlock H).
Rental Return: Hemlock Production Sold - To Enstar
ImJuded in Litre 6: NOT subject to royalty.
certify that the foregoing is true and correct to the best of my knowledge.
Signature A?%W
203,008
138,663
64,345
27,405
Operator
>1 hr:
. G -.I,, �y
(C✓
pool as a
Use
1 r fo—a O� IDILJ tVilla, l
Note: All volumes must be corrects,
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Facility
20. For
6.
Sold
289,493
7.
Reinjected
0
8.
Flared or vented 1 hour or less
167
9.
Flared or vented more than 1 hour (see instr.)
2.370
10.
Pilot and Purge
1,036
11. Assist Gas
0
12. Fuel gas used in lease operations
82,018
13.
Other (see instructions)
g
14.
TOTAL VOLUME (ITEMS 6-13)
375,084
15.
NGL Gas Equivalent
1,071
16.
Purchased gas - Rental Return Gas
118,878
17.
Transferred from: (Off -lease Gas)
0
18.
Transferred to:
(370,148)
Transferred to: Swanson Storage 370,14E
To storage for fuel usage: 0 to Storage for Injection:
372448
To storage for injection is idol Wed in Line 6 as subject to royalty.
Other: Hemlock Production Sold 27,405
certlty, met the toregomg/iss true a. nd correct
tttoo the best of my knowledge.
Signature _ ".��LDy Title
ted Name Connev Dver Phnn<
FAV
Safety
1
Use
LLC
Of
pool as a
23-70
—/b
Note: All volumes must be correctei
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
VT1-
1/6-//&
Swanson River November -15
Excess venting necessary until
Excess venting due to a power the power could be restored
11/01/2015 124250 1330000002 11/3/2015 9:00:00 23:59:00 11/3/2015 U 93.6
outage and venting off of TN -22. and equipment brought back
online.
Excess flaring necessary until
Excess flaring due to bringing up
the power couldrestored
11/01/2015
124250
1330000002
11/3/2015
9:00:00
23:59:00
11/3/2015
U
543.0
plant and Field following power
and equipmentbrought back
outage.
online.
Excess venting due to unscheduled
Excess venting necessary until
11/01/2015
124250
1330000002
11/16/2015
14:00:00
16:30:00
11/16/2015
U
15.6
shutdown of the VRU caused by a
the cooler could be thawed out
frozen cooler.
with indirect heater.
Excess flaring necessary until
Excess Raring due to 20v-1 to VRU
the the ice plug in the VRU
11/01/2015
124250
1330000002
11/17/2015
13:00:00
17:00:00
11/17/2015
U
94.0
compressor froze off.
suction line could be thawed
out.
Excess flaring necessary until
Excess flaring due to an obstruction
the obstruction could be
11/01/2015
124250
1330000002
11/19/2015
10:00:00
23:59:00
11/19/2015
U
53.2
in the VRU liner and freezing issues in
cleared and ice from the lines
the flare line.
thawed.
Excess venting due to an obstruction
Excess ventingnecessarycould
11/0112015
124250
1330000002
11/20/2015
0:00:00
12:00:00
11/20/2015
U
74
in the VRU pump screen which
cleaned
the screen could be cleaned
caused 1st stage scrubber high
and VRU restarted.
leveling.
Excess flaring due to fan motor
Excess flaring necessary until
11/01/2015
124250
1330000002
11/25/2015
0:30:00
5:00:00
11/25/2015
U
40.4.
overload. Equipment was not able to
the unit could be reset.
be restarted immediately.
Excess venting due to fan motor
Excess venting necessary until
11101/2015
124250
1330000002
11/25/2015
0:30:00
5:00:00
11/25/2015
U
24.9
overload. Equipment was not able to
the unit could be reset.
be restarted immediately.
Bringing on wells after power outage;
Excess flaring necessary until
11/01/2015
124250
1330000002
11/26/2015
14:45:00
17:00:00
11/26/2015
U
29.1'
45N Flare
compressor could be restarted.
Excess venting necessary until
11/01/2015
124250
1330000002
11/26/2015
5:00:00
11:00:00
11/26/2015
U
37.4'
Excessing venting due to power
the equipment could be
outage.
restarted.
Excess flaring necessary until
11/01/2015
124250
1330000002
11/26/2015
5:00:00
11:00:00
11/26/2015
U
154.7
Excessing flaring due to power
the equipment could be
outage.
restarted.
River
11I010015 1 124250 1 1330000002
11/01/2015 1 124250 1 1330000002
11/26/2015 5:10:00
11/26/2015 14:45:00
11:25:00 11/26/2015
16:15:00 11/26/2015
B69 Excessing flaring at main flare due to l Excess flaring necessary until
power outage. the wells could be shut in.
341 , I Excessing flaring due to bringing theI Excess flaring necessary until
wells on after power outage. compressor could be restarted.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION +.. e✓
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
1330000002
2. Facility Name
Swanson River
3. Field 4. Operator
Swanson River Unit I HILCORP ALASKA LLC
5. Month/Year of Disposition
December 2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent
of Total Volume.
6. Sold
271,269
Pool Name Pool Code Percent
7. Reinjected0
SWANSON RIVER, HEMLOCK 772100 27.34%
SWANSON RIVER, HEM F/STERLING UNDEF 772105 0.00%
8. Flared or vented 1 hour Or less
27
SWANSON RIVER, TYONEK UNDEFINED 772500 1.27%
SWANSON RIVER, BELUGA UNDEFINED 772520 0.00%
9. Flared or vented more than 1 hour (see instr.)
83 •
SWANSON RIVER, STERLING UNDEFINED 772550 71.38%
10. Pilot and Purge
990
11. Assist Gas
0
12. Fuel gas used in lease operations
91,837
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.13)
364,206
Lease Use
MCF
15. NGL Gas Equivalent (mcf)
2,679
Conservation
MCF
16. Purchased gas - Rental Return Gas
94,730
Waste:
MCF
17. Transferred from: (Off -lease Gas)
0
Commissioner Date
18. Transferred to:
(211,653)
19. Remarks:
Transferred to: Swanson Storage for Injection Total
211,653
• Volume in Line 6 subject to royalty.
156,601
• Volume NOT subject to royalty (Hemlock H).
55,052
Rental Return: Hemlock Production Sold - To Enstar
15,505
• Inctuded in Line 6; NOT subject to royalty.
I the foregoing is true and correct to the best of my knowledge
Signature ��x,y Title
Printed Name
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
1330000002
2. Facility Name -
1 Swanson River
3. Field 4. Operator
Swanson River Unit I HILCORP ALASKA LLC
5. MonthNear of Disposition
I December 2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent
of Total Volume.
6. Sold
271,269
Pool Name Pool Code Percent
7. Reinjected
0
SWANSON RIVER, HEMLOCK 772100 27.34%
SWANSON RIVER, HEM F/STERLING UNDEF 772105 0.00%
8. Flared or vented 1 hour or less
27
SWANSON RIVER, TYONEK UNDEFINED 772500 1.27%
SWANSON RIVER, BELUGA UNDEFINED 772520 0.00%
9. Flared or vented more than 1 hour (see instr.)
82
SWANSON RIVER, STERLING UNDEFINED 772550 71.38%
10. Pilot and Purge
991
11. Assist Gas
0
12. Fuel gas used in lease operations
91,837
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
82
MCF
14. TOTAL VOLUME (ITEMS 6-13)
364,206
Lease Use
MCF
15. NGL Gas Equivalent
919
Conservation
MCF
16. Purchased gas -Rental Return Gas
94,730
Waste:
MCF
17. Transferred from: (Off -lease Gas)
02-11-/4
/
2 - /1_ / (�
`- C missioner DGate
PCM"-'-1"W
18. Transferred to:
(339771)
Transferred to: Swanson Storage 339,771
To storage for fuel usage: 0 to Storage for Injection'
372446
To storage for injection is induded in Line 6 as subject to royalty.
Other: Hemlock Production Sold 15,505
certlty that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Production Analyst to pressure of 14.65 psia and to a
ted Name Cortnev Over Phone 711-9AQ_99A1 not. v,cron,c temperature of 60o F. Authority 20
V 7-
Z/!o/1 L
Swanson River
December-15
RPIDatis
OpNo
Facli
.Dale Flared
Start Tmre
Ending Time
End Date
Planned
MCF
Description of Flaring Event
cbon a en to immize
Vdume
12/01/2015
124250
1330000002
12/3/2015
11:30:00
14:00:00
12/3/2015
Excess venting of Tank 22 due to
ti
Excess venting necessary unlliquid
U
22.1
failure of lipoid transfer pump.
transfer pump could be
restarted.
12/01/2015
124250
1330000002
12/3/2015
11:30:00
14:00:0012/3/2015
Excess flaring due to liquid transfer
Excess flaring necessary until
U
26.4
pumpfailure.
transfer pump could be
restarted.
Excess venting necessary due to
12101/2015
124250
1330000002
12/19/2015
18:30:00
20:15:00
12/19/2015
U
11.1
unscheduled shutdown of
Excess venting necessary
Compressor due to high 1st stage
stripper gas could be adjusted.
suction pressure.
12/01/2015
124250
1330000002
12/26/2015
0:00:00
Ex cess venting due to unscheduled
Excess venting necessary until
12:00:00
12/26/2015
U
12.8
shutdown of VRU due to over
compressor could be safely
pressure
restarted.
12/01/2015
124250
1330000002
12/2]/2015
1000:00
Excess venting due to unscheduled
Excess venting necessary until
11:30:00
12/27/2015
U
9.6
shutudown of VRU due to
compressor could be safety
overpressure.
restarted.
82