Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutSR Swanson River LEX - Hilcorp Alaska LLCState of Alaska AOGCC Gas Disposition Files Year: 2015 Facility: SR Swanson River LEX Operator: Hilcorp Alaska LLC     STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1330000002 1 Swanson River I Swanson River Unit 6. Sold 199,729 7. Reinjected 0 8. Flared or vented 1 hour or less 150 9. Flared or vented more than 1 hour (see instr.) 489' 10. Pilot and Purge 1,473 11. Assist Gas 0 12. Fuel gas used in lease operations 80,245 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6.13) 282,086 15. NGL Gas Equivalent 2,716 * 16. Purchased gas - Rental Return Gas 157,714 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: (89.842) Transferred to: Swanson Storage 89,842 To storage for fuel usage: 0 to Storage for Injection: 89842 To storage for injection is included in Line 6 as subject to royalty. Other: Hemlock Production Sold 61,813 cemry that the foregoing is true and correct to the best of my knowledge. Signature �-ot�i Zc " HILCORP ALASKA LLC fi' -A Use I. P-1 Va-ay? ,,tk 01 January 2015 ach pool as a percent Note: All volumes must be correcte to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 1. 6. Sold 199,728 7. Reinjected 0 S. Flared or vented 1 hour or less 150 9. Flared or vented more than 1 hour (see instr.) 488" 10. Pilot and Purge 1,473 11. Assist Gas 0 12. Fuel gas used in lease operations 80,245 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6.13) 282,086 15. NGL Gas Equivalent 16. Purchased gas - Rental Return Gas -' '` 157,714 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: (89,842) Transferred to: Swanson Storage 89,842 To storage for fuel usage'. o to storage for injection 89842 To storage for Injection is included in Line 6 as subject to royalty. Other: Hemlock Production Sold 61,813 certify that the foregoing/ is true and correct to the best of my knowledge. Signature l� Dyi�' Title Prodi 1-1 sl.,Me Phone 713-: 20. For Nate Nhr =� RECEIVED FEB 2 3 2015 A000C LASKA LLC I January 21P15 pools, list contribution of each pool as a percent Total Volume. Use 3 -z.3 -/s- Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 600 F. Authority 20 - -r- --: `, 0 705 OR FLARING EVENTS GREATER THAN 1 HOUR Action Taken to Minimize R tDate 01/01/2015 O No.. 124250 Facili No 1330000002 Date Flared 1/16/2015 Start Time 10:00:00 PM Ending Time 1:30:00 PM End Date 1/17/2015 Planned U MCF 52.5 Descri lion of Flaring Event Excess venting due to shutdown of Compressor K-22 for unscheduled maintenance to fix a leaky gas cooler. Volume Excess venting necessary until cooler could be repaired and compressor brought back online. Excess venting due to unscheduled Excess venting necessary until shutdown of Compressor K-22 ail and plugs could be changed 01/01/2015 124250 1330000002 1/19/2015 10:00:00 AM 6:00:00 PM 1/19/2015 U 27.2 because of low compressor lube pressure. Excess venting due to shutdown of and compressor brought back online. Excess venting necessary until 01/01/2015 124250 1330000002 1/20/2015 12:35:00 AM 8:55:00 PM 1/23/2015 U 314.6 Compressor K-8 caused by unscheduled maintenance after losing a piston cylinder. maintenance could be completed and compressor brought back online. Excess flaring necessary until Excess flaring due to shutdown of the shuttle valve on the drip 01/01/2015 124250 1330000002 1/22/2015 10:30:00 AM 6:00:00 PM 1/22/2015 U 95.7 Compressor K-8 for unscheduled maintenance caused by lube failure. counter was replaced and compressor brought back online. 1330000002 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Swanson River I Swanson River Unit 6. Sold 221,566 7. Reinjected 0 8. Flared or vented 1 hour or less 393' 9. Flared or vented more than 1 hour (see instr.) 751 10. Pilot and Purge 982 • 11. Assist Gas 0 12. Fuel gas used in lease operations 86,017 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6.13) 309,033' 15. NGL Gas Equivalent 6,456 16. Purchased gas - Rental Return Gas 182,267 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: (35,098) Transferred to: Swanson Storage 35,098 To storage for fuel usage: 0 to Storage for Injection: 35098 To storage for injection is included in Line 6 as subject to royalty. Other: Hemlock Production Sold 109,979 I hereby certify that the foregoing is true and correct to the best of my knowledge. `� Signature � 4" Title HILCORP ALASKA LLC Lease Use February 2015 each pool as a percent T'i .,.,, �rpNl &.. o' Jwe.l_ 9Lee� net. lote: All volumes must be corrects, to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Name 6. Sold 175,389 7. Reinjected 0 8. Flared or vented 1 hour or less 386 9. Flared or vented more than 1 hour (see instr.) 73 9 10. Pilotand Purge 965 11. Assist Gas 0 12. Fuel gas used in lease operations 172,419 13. Other (see instructions) 14. TOTAL VOLUME (ITE 6.1 tr ._ 0 L ncn W R. U 0 349,232 15. NGL Gas Equivalent 925 16. Purchased gas - Rental Return Gas 205,971 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: (27,787) 19. Remarks: Transferred to: Swanson Storage 27,787 To storage forfuel usage: 0 to Storage for Injection: 89842 To storage for Injection is included in Line 6 as subject to royalty. Other: Hemlock Production Sold 87,057 1 hereby certify that the foregoing is true and correct ttto�the best of my knowledge. Signature �� Title Produ >1 hr. I. fav %^I •2,r DECEIVED MAR 2 3 2015 A®GCC HILCORP ALASKA LLC I February 2015 nom multiple pools, list contribution of each pool as a percent of Total Volume. Use tote: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 V7- f- _ RECEIVED MAR 2 3 2015 OR FLARING EVENTS GREATER THAN 1 HOUR R tOate O No FacN' No Date Flared Start Time ErWI Time End Date Planned MCF Descri tion of Flarin Event Action Taken to Minimize Volume Excess flaring due to unscheduled Excess Flaring necessary until 02/01/2015 124250 1330000002 2/1/2015 1:00.00 PM 4:00:00 PM 2/1/2015 U 68.5 maintenance in the Plant causing maintenance could be emergency shutdown. completed. Excess venting due to unscheduled 02101/2015 124250 1330000002 2/20/2015 3:30:00 PM 4:45:00 PM 2/20/2015 U 4.5 shutdown of Compressor K-22 Excess venting necessary until because of high vapors from Tank 22 compressor could be loaded which overloaded the compressor. and restarted. 1330000002 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Swanson River Swanson River Unit 6. Sold 217,568 7. Reinjected 0 8. Flared or vented 1 hour or less 136 9. Flared or vented more than 1 hour (see instr.) 865 10. Pilot and Purge 1,967 11. Assist Gas 0 12. Fuel gas used in lease operations 92,553 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6.13) 313,089 15. NGL Gas Equivalent 6,706- ,706-16. 16. Purchased gas - Rental Return Gas 189,370 17. Transferred tram: (Off -lease Gas) 0 18. Transferred to: (41,993) Transferred to: Swanson Storage 41,993 To storage for fuel usage: 0 to Storage for Injection: 89842 To storage for injection is included in Line 6 as subject to royalty. Other: Hemlock Production Sold 106,197 that the foregoing is true and correct to the best of my knowledge Signature Zy" HILCORP ALASKA LLC from multiple pools, list r Use March 2015 ch pool as a percent I . �f� ai e-- � � ( cLo e - Note: All volumes must be correcte to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION . Facility Number 1330000002 2. Facility Name Swanson River 3. Field Swanson River Unit 4. Operator I HILCI Disposition Volume MCF 20. For production from m . Sold 217,566 Pool Name . Reinjected 0 SWANSON RIVER, HI SWANSON RIVER, HEM F/Sl Flared Or vented 1 hour or less 136 SWANSON RIVER, TYONEI SWANSON RIVER, BELUG Flared or vented more than 1 hour (see instr.) 865' SWANSON RIVER, STERi 0. Pilot and Purge 1,967 1. Assist Gas 0 2. Fuel gas used in lease operations 92,553 3. Other (see instructions) p Authorization>1 hr. 4. TOTAL VOLUME (ITEMS 6-13) 313,089 5. NGL Gas Equivalent 6. Purchased gas -Rental Return Gas + = 953 189,370 Waste: 7. Transferred from: (Off -lease Gas) 0 O / B. Transferred to: (41,993) Analyst 9. Remarks: Transferred to: Swanson Storage 41,993 To storage for fuel usage: 0 to Storage for Injection: 89842 To storage for inlecton is included in Line 6 as subject to royalty. Other: Hemlock Production Sold 106,197 hereby certify that the foregooiinngg1 is true and correct to the best of my knowledge. D Signature V-4- Title Production RECEIVE® APR 2 2 2015 A®GCC as a Safety Lease Use l7 5-12- -1 J` - lots: All volumes must be correcte, to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 VT -i sl�,1i5 RECEIVED APR 222015 OR FLARING EVENTS GREATER THAN 1 HOUR I Action Taken to Minimize RiptDate O No FacllKvNo Date Flared Stan Time Ending Time End Dale Planned MCF Description of Rating Event Volume Excess venting necessary until 0101=15 124250 1330000002 3/13/2015 3:15:00 PM 4:30:00 PM 3/23/2015 U 864,0 Excess venting due to Compressor K- the cylinder liner could be 22 losing a cyclinder. repaired, new piston machined and installed. Excess venting due to liquids Excess venting necessary until 0301/2015 124250 1330000002 3/25/2015 4:00:00 PM 1130:00 PM 3/25/2015 P 1.0 unloading of Well 31-8 casioggasfor liquids unloading complete drilling. and well brought backenline. 1330000002 6. Sold 7. Reinjected 8. Flared orvented 1 hourorless 9. Flared or vented more than 1 hour (see instr.) 10. Pilot and Purge 11. Assist Gas 12. Fuel gas used in lease operations 13. Other (see instructions) 14. TOTAL VOLUME (ITEMS 6.13) 15. NGL Gas Equivalent 16. Purchased gas - Rental Return Gas 17. Transferred from: (Off -lease Gas) 18. Transferred to: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Swanson River Swanson River Unit HILCORP ALASKA LLC April 2015 Volume MCF 20. For production from multiple pools, list contribution of each pool as a 233,908 of Total Volume. Pool Name Pool Code 1 0 SWANSON RIVER, HEMLOCK 772100 f 758 407 1 1,356 0 82,862 0 319,291 5,642 191,914 0 (21,654) Transferred to: Swanson Storage 21,654 To storage for fuel usage: 0 to Storage for Injection: 21654 To storage for injection is included in Line 6 as subject to royalty. Other: Hemlock Production Sold 127,577 certity mat the foregoing is true and correct to the best of my knowledge. Signature ` anZ�K" Title Use I. Pty. wPsa A a 0�0 -,-1 J4 Note: All volumes must be correcte to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Sold . Reinjected . Flared or vented 1 hour or less Flared or vented more than 1 hour (see instr.) 0. Pilot and Purge 1. Assist Gas 2. Fuel gas used in lease operations 3. Other (see instruc5ons) 4. TOTAL VOLUME (ITEMS 6.13) 5. NGL Gas Equivalent 6. Purchased gas - Rental Returp G 7. Transferred from: (Off -lease Gas) 8. Transferred to: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION HILCORP 233,908 0 758 407' 1,356 0 82,862 0 MAY 27 2J 4 0G Z. G, list contribution of each pool as a percent of Authorization>1 hr Safety 7 bT 319,291 Lease Use 941 Conservation s.` 191,914 Waste: 00 / (21,654) Transferred to: Swanson Storage 21,654 To storage for fuel usage: 0 to Storage for Injection: 21654 To storage for injection is included in Line 6 as subject to royally. Other: Hemlock Production Sold 127,577 �S I Note: All volumes must be corrected Signature -`�`i �y� Title Production Analyst to pressure of14.65 psia and to a temperature of 60o F. Authority 20 led Name Codnev Dver Phone 713-289-2881 Date 5/15/2n15 enr.Is Oso iITL 1,15-1! s GAS DISPOSITION IMPORT FORM FOR FLARING EVENTS GREATER THAN 1 HOUR Action Taken to Minimize R tDate O No FactiftyNct Date flared Start Time Ending Time End Date Planned MCF Description of Flaring Event Volume Excess venting necessary until maintenance could be Excess venting due to unscheduled 04/01/2015 124250 1330000002 4/9/2015 8:45:00 AM 5:30:00 PM 4/11/2015 U 182.4 shutdown of Compressor K-22 completed and compressor because of lost cylinder #1. brought back online. Cylinder head was made and compressor repaired. Excess venting necessary until maintenance could be Excess venting due to unscheduled shutdown of Compressor N-22 completed and compressor 04/01/2015 124250 1330000002 4/11/2015 7:30:00 PM 2:00:00 PM 4/13/2015 U 137.0 brought back online. Cylinder because of major cooling system N2 was inspected and field Issues. found piston was damaged. Pairs were ordered. Excess flaring necessary until 04/01/2015 124250 1330000002 4/17/2015 9:30:00 AM 11:30:00 AM 4/17/2015 P 6.5 Excess venting due to shutdown of maintenance could be compressor K-22 for service to 20v-1. completed and compressor brought back online. Excess flaring necessary until 04/01/2015 124250 1330000002 4/20/2015 1:00:00 AM 2:30:00 AM 4/20/2015 U 40.9 Excess flaring due to K-12 scrubber valve could be located and dump valve stuck open. closed. Excess venting due to unscheduled Excess venting necessary until 04/01/2015 124250 1330000002 4/25/2015 9:30:00 PM 10:00:00 AM 4/26/2015 U 40.2 shutdown of Compressor K-22 for repairs could be complete and re pair of an impeller on circulation compressor brought back pump. online. x ' x STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000002 2. Facility Name Swanson River 3. Field Swanson River Unit 4. Operator HILCORP ALASKA LLC 5. Month/Yearof Disposition May 2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 281,067 Pool Name Pool Code Percent 7. Reinjected 0 SWANSON RIVER, HEMLOCK 772100 45.72% SWANSON RIVER, HEM F/STERLING UNDEF 772105 0.00% 8. Flared or vented 1 hour or less 449 SWANSON RIVER, TYONEK UNDEFINED 772500 0.00% SWANSON RIVER, BELUGA UNDEFINED 772520 0.00% 9. Flared or vented more than 1 hour (see instr.) 686 SWANSON RIVER, STERLING UNDEFINED 772550 54.28% 10. Pilot and Purge 1,820 11. Assist Gas 0 12. Fuel gas used in lease operations 79,998 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.13) 364,020 Lease Use MCF 15. NGL Gas Equivalent 5,086 ' Conservation MCF 16. Purchased gas - Rental Return Gas 163,621 Waste: MCF 17. Transferred from: (Off -lease Gas) 0 Commissioner Date 18. Transferred to: (93,576) �• �la""� are (J 19. Remarks: Transferred to: Swanson Storage 93,576 To storage for fuel usage: 0 to Storage for Injection: 93576 To storage for injection is included in Line 6 as subject to royalty. Other: Hemlock Production Sold 84,872 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be correcte Signature e'Allic" Title Production Analyst to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 ted Name Cndnav Dver Phone 713-289-2881 Date 7/24/2017 AAC25.235. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Facility Name . Sold 281,067 Poc Reinjected 0 SWANSON F SWANSON RIVER, 1 - Flared or vented 1 hour or less Flared 449 SWANSON RIVER SWANSON RIVER Flared or vented more than 1 hour (see instr.) 686' SWANSON RIVER, 0. Pilot and Purge 1,820 1. Assist Gas 0 2. Fuel gas used in lease operations 79,998 3. Other (see instructions) 0 Authorization >1 hr: 4. TOTAL VUL.UME (ITEMS 6.13) 364,020 5. NGL Gas Equivalent 997 6. Purchased gas - Rental Return Gas 163,621 Waste: 7. Transferred from: (Off -lease Gas) 0 B. Transferred to: (93,576) 9. Remarks: Transferred to: Swanson Storage 93,576 To storage forfuel usage: 0 to Storage for Injection: 93576 To storage for injection is included in Line 6 as subject to royalty. Other: Hemlock Production Sold 84,872 hereby certify that the foregoing// is true and correct to the best of my knowledge. Signature Title Production Analyst Printed Name Cortnev Dyer Phone 713-289-2881 Date Use MR as a 1572% 0.00 0.00°/ !D -/-i S - to pressure of 14.65 pale and to a temperature of 60o F. Authority 20 VT I - 9/)F1 )5 OR FLARING EVENTS GREATER THAN 1 HOUR Action Taken to Minimize R tDater124250 Facit No Date Flared Start Time EndingTime End Date Planned MCF Description of Flaring Event Volume Excess venting due to Compressor K- 22 down for repairs to cylinder #1. Excess venting necessary until 05/01/2015 1330000002 5/2/2015 245:00 PM 1:00:00 PM 5/6/2015 U 309.9 Venting will be ongoing until repairs repairs could be made. are made. Excess venting necessary until Excess venting due to scheduled 05)01/2015 1330000002 5/8/2015 8:15:00 AM 12:45:00 PM 5/8/2015 P 15.3 maintenance on Compressor K-22 to maintenance could be completed and compressor install compressor thermowells. restarted. Excess flaring necessary until Excess flaring due to 1-27 tank setting 0501/2015 124250 1330000002 5/11/2015 6:00:00 AM 8:00:00 AM 5/11/2015 U 42.2 the tank could be shut in and vessle gassing threw adump valve. ixed. Excess venting due to a leaky valve on Excess venting necessary until 05101/2015 124250 1330000002 5/22/2015 9:00:00 AM 12:00:00 PM 5/22/2015 U 239.6 the 1903 PSV. Repair parts were grease could be pumped into ordered. thevalvle. Excess venting due to unscheduled shutdown of Compressor K-22 Excess venting necessary until 05101/2016 124250 1330000002 5/24/2015 9:00:00 AM 1100:00 AM 5/24/2015 U 7.0 compressor could be loaded because of high vapors from Tank 22 which overl oaded the compressor. and restarted. Excess venting due to shutdown of Excess venting necessary until Compressor K-22 caused by high 05/07/2075 124250 1330000002 5/30/2015 3:00:00 PM 6:30:00 PM 5/30/2015 U 13.0 the compressor cooled and ambiant temperature causing restarted. Common temperature shut down. Excess venting necessary until Excess venting due to a power outage 05/01/2015 124250 1330000002 5/31/2015 7:15:00 AM 9:30:00 AM 5/31/2015 U 12.5 which caused the unavoidable power could be restored and shutdown of Compressor K-22. Compressor could be brought back online. Excess flaring necessary until Excess flaring due to a power outage power could be restored and 05/01/2015 124250 1330000002 5/31/2015 7:15:00 AM 10:30:OOAM 5/31/2015 U 15.3 which caused the unavoidable shutdown of Compressor K-8. Compressor could be brought hack online. Excess venting due to high Excess venting necessary until 05012015 124250 1330000002 5/31/2015 7:15:00 AM 10:00:00 PM 5/31/2015 U 31.2 temperature shutdown of the compressor cooled and Compressor K-22. restarted. ,:�eZ)e-gA- OR FLARING EVENTS GREATER THAN i HOUR Action Taken to Minimize R fDi Casio Facir No Date Flared Stan Time Ending Tune End Date Planned MCF Description of Flarin Event Volume Excess venting due to Compressor K- 22 down for repairs to cylinder Nl. Excess venting necessary until 05/01/2015 124250 1330000002 5/2/2015 7:45:00 PM 1:00:00 PM 5/6/2015 U 309.9 Venting will be ongoing until repairs repairs could be made. are made. Excess venting necessary until Excess venting due to scheduled 05/01/2015 124250 1330000002 5/8/2015 8:15:00 AM 12:45:00 PM 5/8/2015 P 15.3 maintenance on Compressor K-22 to maintenance could be completed and compressor Install compressor thefmowells. restarted. Excess flaring necessary until Excess flaring due to l-27 tank setting xcess wringgassidue to 1a7 tankmp 05/01/2015 124250 1330000002 5/11/2015 6:00:00 AM 8:00:00 AM 5/11/2015 U 42.2 the tank cou Id be shut in and vesfixed. Excess venting due to a leaky valve on Excess venting necessary until 05/01/2015 124250 1330000002 5/22/2015 9:00:00 AM 12:00:00 PM 5/22/2015 U 239.6 the 1901 PSV. Repair parts were grease could be pumped into ordered. thevalvle. Excess venting due to unscheduled Excess venting necessary until shutdown of Compressor K-22 05/01/2015 124250 1330000002 5/24/2015 9:00:OOAM 11:00:OOAM 5/24/2015 U 7.0 compressor could be loaded because of high vapors from Tank 22 which overloaded the compressor. and restarted. Excess venting due to shutdown of Excess venting necessary until Compressor K-22 caused by high 05/01/2015 124250 1330000002 5/30/2015 3:00:00 PM 6:30:00 PM 5/30/2015 U 13.0 the compressor cooled and ambient temperature causing Common temperature shut down. restarted. Excess venting necessary until Excess venting due to a power outage power could be restored and 05/01/2015 124250 1330000002 5/31/2015 7:15:OOAM 9:30:00 AM 5/31/2015 U 12.5 which caused the unavoidable Compressor could be brought shutdown of Compressor K-22. back online. Excess flaring necessary until Excess flaring due to a power outage power could be restored and 05/01/2015 124250 1330000002 5/31/2015 7:15:00 AM 10:30:OOAM 5/31/2015 U 15.3 which caused the unavoidable Compressor could be brought shutdown of Compressor K-8. back online. Excess venting due to high Excess venting necessary until 05/01/2015 124250 1330000002 5/31/2015 7:15:OOAM 10:00:00 PM 5/31/2015 U 31.2 temperature shutdown of the compressor cooled and Compressor K-22. restarted. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000002 2. Facility Name Swanson River 3. Field Swanson River Unit 4. Operator HILCORP ALASKA LLC 5. Month /Vear of Disposition June 2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of Total Volume. of each pool as a percent 6. Sold 232,203 Pool Name Pool Code Percent 7. Reinjected 0 SWANSON RIVER, HEMLOCK 772100 53.15% SWANSON RIVER, HEM FISTERLING UNDEF 772105 0.00% 8. Flared or vented 1 hour or less 78 SIMANSON RIVER, TVONEK UNDEFINED 772500 0.28% SWANSON RIVER, BELUGA UNDEFINED 772520 0.00% 9. Flared or vented more than 1 hour (see instr.) 635% SWANSON RIVER, STERLING UNDEFINED 772550 46.56% 10. Pilot and Purge 1,389 11. Assist Gas 0 12. Fuel gas used in lease operations 79,035 13. Other (see instructions) 0 Official Use Only Authorization >t hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.13) 313,340 Lease Use MCF 15. NGL Gas Equivalent 6,791 - Conservation MCF 16. Purchased gas -Rental Return Gas - 163,929 Waste: MCF 17. Transferred from: (Off -lease Gas) 0 Commissioner Date 18. Transferred to: (45.818) l• 19. Remarks: Transferred to: Swanson Storage 45,818 To storage for fuel usage: 0 to Storage for Injection: 45818 To storage for injection is included in Line 6 as subject to royalty. Other: Hemlock Production Sold 97,885 I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be correcte Signature �,ott+sc� ��-�^ Title Production Analyst to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Cortnev Over Phone 713 -2R9 -2R81 Date 7%4/2n17 AAC25.235. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 1. Facility Number 1330000002 2. Facility Name Swanson River 3. Field 4. Operator Swanson River Unit HILCORP ALASKA LLC Disposition 5. Month/Year o'0p June 2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 232,203 Pool Name Pool Code Percent 7. Reinjected 0 SWANSON RIVER, HEMLOCK 772100 53.15% SWANSON RIVER, HEM FISTERLING UNDEF 772105 0.00% 8. Flared or vented 1 hour or less 78 SWANSON RIVER, TYONEK UNDEFINED 772500 0.28% SWANSON RIVER, BELUGA UNDEFINED 772520 0.00% 9. Flared or vented more than 1 hour (see instr.) 635 SWANSON RIVER, STERLING UNDEFINED 772550 46.56% 10. Pilot and Purge 1,389 11. Assist Gas 0 12. Fuel gas used in lease operations 79,035 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.13) 313,340 Lease Use MCF 15. NGL Gas Equivalent 1,241 Conservation MCF 16. Purchased gas - Rental Return Gas 163,929 Waste: MCF 17. Transferred from: (Off -lease Gas) 0 R� ./ c? -2— Com Issioner Date 18. Transferred to: (45,818) Transferred to: Swanson Storage 45,818 To storage for fuel usage: 0 to Storage for Injection: 45818 To storage for injection is included in Line 6 as subject to royalty. Other: Hemlock Production Sold 97,885 hereby certify that the foregoing is true and correct to the best of my knowledge. �". " "" Note: All volumes must be corrected Signature l� rw.iurc/ D�� Title Production Analyst to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Cortnev Dver Phone 713-289-2881 Date 7/20/2015 AAC25.235. V%I— Yl-z�15 OR FLARING EVENTS GREATER THAN 1 HOUR Acllon Taken to Minimize R oste O No Facilil No Date Flared Start Time Ending Time End Date Planned MCF Description of Flaring Event Volume Excess venting due to unscheduled Excess venting necessary until 06/01/2015 124250 1330000002 6/13/2015 4:00:00 PM 7:00:00 PM 6/13/2015 U 10.8 shutdown of Compressor K-22 compressor could be cooled caused by high temperature issues. and restarted. Excess venting due to unscheduled Excess venting necessary until 06/01/2015 124250 1330000002 6/14/2015 1:30:00 PM 8:30:00 PM 6/14/2015 U 24.5 shutdown of Compressor K-22 caused the compressor could be by overheating. cooled and restarted. Excess venting due to high Excess venting necessary until 06/01/2015 124250 1330000002 6/15/2015 11:30:00 AM 5:00:00 PM 6/15/2015 U 19.6 temperature shutdown of the compressor cooled and Compressor K-22. restarted. Excess flaring due to multiple high Excess flaring necessary until 06/01/2015 124250 1330000002 6/15/2015 5:45:00 PM 10:45:00 PM 6/15/2015 U 58.9 temperature shutdowns of the compressor could cool Compressor K-8. down and restarted. Excess venting due to high Excess venting necessary until 06/01/2015 124250 1330000002 6/15/2015 6:00:00 PM 11:00:00 PM 6/15/2015 U 17.7 temperature shutdown of the compressor cooled and Compressor K-22. restarted. Excess venting due to high Excess necessary until 8:00:00 PM 6/16/2015 U 39.3 compressor cylinder temperatures comprventing ooled the compressor cooled and 06/01/2015 124250 1330000002 6/16/2015 9:00:00 AM caused by high ambient temperature restarted. and Compressor K-22 shutdown. Excess flaring due to high jacket Excess flaring necessary until 8:00:00 PM 6/16/2015 U 103.1 water temperatures and low oil the compressor cooled and 06/01/2015 124250 1330000002 6/16/2015 10:30:00 AM pressure caused by high ambient restarted. temperature. Excess venting due to unscheduled Excess venting necessary until 06/01/2015 124250 1330000002 6/17/2015 3:30:00 AM 8:00:00 PM 6/19/2015 U 228.7 shutdown of Compressor K-22 caused the mechanics can replace the by Comp cylinder N1 going out. cylinder and complete repairs. Excess flaring due to high jacket Excess flaring necessary until 06)01/2015 124250 1330000002 6/17/2015 1115:00 AM 11:15:00 PM 6/17/2015 U 121.7 water and compressor temperature caused from high ambient compressor could be cooled and restarted. temperatures. Excess venting due to blow down of Excess venting necessary until 06/01/2015 124250 1330000002 6/27/2015 3:05:00 AM 4:35:00 AM 6/27/2015 P 2.9 production casing from 95psi to blow down could be 45psi. completed. Excess venting due to unscheduled Excess venting necessary until 06/012015 124250 1330000002 6/28/2015 11:45:OOAM 2:00:00 PM 6/28/2015 U 7.9 shutdown of Compressor K-22 caused the compressor could be by high temperatures. loaded and restarted. I ,/ x PA STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 6. Sold 7. Reinjected 8. Flared or vented 1 hour or less 9. Flared or vented more than 1 hour (see instr.) 10. Pilot and Purge 11. Assist Gas 12. Fuel gas used in lease operations 13. Other (see instructions) 14. TOTAL VOLUME (ITEMS 6.13) 15. NGL Gas Equivalent (mcf) 16. Purchased gas - Rental Return Gas 17. Transferred from: (OH -lease Gas) 18. Transferred to: SOLD SRU Field to Ensue (royalty -bearing) SRU Field to Enstar (Hemlock Noo-royaky) SRU b Storage (royalty- bearing) SRU to Storage (Hemlock Norfroyalty) Field 226,333 0 40 289 1 1,216 0 81,933 0 309,811 6,707 475,537 0 (27,765) 95,301 103,267 13,325 14,440 For production from multiple pools, list >1 Use TRANSFERRED TO Incl. Line 6 SolNlnj to Storage 1• Floe, 1 ¢rip""A o. CK 3 l as a percent 27,765 certify that the foregoing is true and correct to the best of my knowledge. �e Note: All volumes must be correcte, Signature Title Production Analyst to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 led Name r:nrinev Dve.r Phone 713-289-2881 Date 9115120171 AAC25.235. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000002 2. Facility Name Swanson River 3. Field Swanson River Unit 4. Operator HILCORP ALASKA LLC 5. Month7Year of 20Disposition Jul 15 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 226,333 Pool Name Pool Code Percent 7. Reinjected 0 SWANSON RIVER, HEMLOCK 772100 53.67% SWANSON RIVER, HEM F/STERLING UNDEF 772105 0.00% S. Flared or vented 1 hour or less 40 SWANSON RIVER, TVONEK UNDEFINED 772500 0.00% SWANSON RIVER, BELUGA UNDEFINED 772520 0.00% 9. Flared or vented more than 1 hour (see instr.) 289 SWANSON RIVER, STERLING UNDEFINED 772550 46.33% 10. Pilot and Purge 1,216 11. Assist Gas 0 12. Fuel gas used in lease operations 81,933 13. Other (see instructions) 0 Official Use Only Authorization >1 hr Safety p z ` MCF 14. TOTAL VOLUME (ITEMS 6-13) 309,811 Lease Use MCF 15. NGL Gas Equivalent 1,380 Conservation MCF 16. Purchased gas- Rental Return Gas 161,120 Waste: MCF 17. Transferred from: (Off -lease Gas) 0 : / ZJ - 2 - /S ommisswner Date 18. Transferred to: (27,765) Transferred to: Swanson Storage 27,765 To storage for fuel usage: 0 to Storage for Injection: 27765 To storage for injection is included in Line 6 as subject to royalty. Other: Hemlock Production Sold 103,267 certify that the foregoing is true •anorreec-t to the best of my knowledge. Signature 1..� //L/Q/2� Title PTodu tPfl NPTP r.nrtnPV DVPr phnnA 715-% Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 v T f-- klzl1 S OR FLARING EVENTS GREATER THAN 1 HOUR Action Taken to Minimize RptDaho O No FacilityNo Date Flared Start Time Ending Time End Date Planned MCF Description of Flaring Event Volume Excess venting due to unscheduled 0])01/2015 124250 1330000002 7/1/2015 7:30:00 PM 10:00:00 AM 7/2/2015 U 52.8 shutdown of Compressor K-22 caused Excess venting necessary until maintenance could be by high temperature and high vibration. completed. Excess venting due to unknown 07/0112015 124250 1330000002 7/3/2015 11:00:0GAM 2:00:00 PM 7/3/2015 U 10.9 reasons, mechanic was contacted and Ex cess venting necessary until compressor could be restarted. compressor restarted. Excess flaring due to high Excess flaring necessary until 07/01/2015 124250 1330000002 7/3/2015 5:30:00 PM 7:45:00 PM 7/3/2015 U 19.7 temperature shutdown of temperatures could be lowered Compressor K-8. and compressor brought back online. Excess venting due to 2-15 and 1-27 07/01/2015 124250 1330000002 7/7/2015 12:00:00 PM 2:00:00 PM 7/7/2015 P 1.5 tank settings lined to gauge tanks to Ezcess venting necessary until flush north oil line. tank gauging complete. Excess venting due to scheduled 07/01/2015 124250 1330000002 7/10/2015 10:00:00 AM 1:00:00 PM 7/10/2015 P 20 maintenance to flush lined fluid out Excess venting necessary until lined fluids could be brought of 1-27 TS and 2-15 TS between 1-27 back to oil line after flush job. TS and 1-33 T5. Excess flaring due to shutdown of Excess flaring necessary until 07/01/2015 124250 1330000002 7/12/2015 1:00:00 PM 4:30:00 PM 7/12/2015 P 572 Compressor K-8 for scheduled maintenance could be maintenance to figure out low oil completed and compressor pressure problem. brought back online. Excess venting due to bleed down Excess venting necessary until 07/01/2015 124250 1330000002 7/12/2015 1:30:00 PM 3:30:00 PM 7/12/2015 P 9.0 Wells 31-8 and 32-8 production the bleeding could be complete casings. and bleed valves shut. Excess venting due to bleed down Excess venting necessary until 07/01/2015 124250 1330000002 7/13/2015 1:15:00 PM 2:30:00 PM 7/13/2015 P 10.0 Wells 31.8 and 32-8 production the bleeding could be complete casings. and bleed valves shut. Excess venting due to unscheduled shutdown of Compressor K-22 on until WI01/2015 124250 1330000002 7/16/2015 3:00:00 AM 7:00:00 AM 7/16/2015 U 11.8 the the governor could be replaced governor could be overspeeding caused by a bad and compressor restarted. governor. Excess venting due to scheduled Excess venting necessary until 07/01/2015 124250 1330000002 7/23/2015 8:00:00 AM 3:45:00 PM 7/23/2015 P 14.0 shutdown of the K-22 Compressor for maintenance was completed and compressor loaded and repair and maintenance. restarted. Excess flaring necessary until flaring shutdown of Eompressor 07/01/2015 124250 1330000002 7/23/2015 9:00:00 AM 3:00:00 PM 7/23/2015 P 50.2 cxcess Compressor caused by shutdown OfK aused f K repairs to K-22 Compressor 22 Compressor for maintenance. were complete and both units loaded and restarted. OR FLARING EVENTS GREATER THAN i HOUR Action Taken to Minimize R tDate O No Facilftylso, Date Flared Start Time Ending Tim End Date Punned MCF Description of Flaring Event Volume Excess venting due to unscheduled shutdown of Compressor K-22 for Excess venting necessary until 07/01/2015 124250 1330000002 7/24/2015 7:30:00 AM 10:30:00 AM 7/24/2015 U 13.0 repairs made to starting panel and N2 repair were complete and compressor brought back compressor cylinder head temperature probe. online. Excess venting due to shutdown of Excess venting necessary until 07/01/2015 124250 1330000002 7/25/2015 3:30:00 AM 7:30:00 AM 7/25/2015 U 18.1 Compressor K-22 caused by low the compressor could be trouble shot and compressor engine oil pressure. loading and restarted. Excess flaring due to unscheduled sa Exess flaring necessary until 07/01/2015 124250 1330000002 7/29/2015 1:15:00 PM 2:45:00 PM 7/29/2015 U 11.3 shutdown of Compressor K-8 caused compressor could loaded by high discharge pressure from Field 150. and restarted. Excess venting due to unscheduled shutdown of Compressor K-22 caused Excess venting necessary until 07/01/2015 124250 1330000002 7/31/2015 7:00:00 PM 9:00:00 PM 7/31/2015 U 7:3 the compressor could be and high by higscharg pressature discharge pressure. loaded and restarted. Name 3. Sold 7. Reinjected 3. Flared or vented 1 hour or less 3. Flared or vented more than 1 hour (see instr.) 10. Pilot and Purge 11. Assist Gas 12. Fuel gas used in lease operations 13. Other (see instructions) 14. TOTAL VOLUME (ITEMS 6-13) 15. NGL Gas Equivalent (mcf) 16. Purchased gas - Rental Return Gas 17. Transferred from: (Off -lease Gas) 18. Transferred to: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SOLD SRU Field to Emlar(royally-beadrg) SRU Field to Easter (Hemlock NorHroyafty) SRU to Storage (royalty- bearing) SRU to Storage (Hemlock NorFroyally) Field 208,043 0 17 339 t 1,272 0 81,489 0 Official Authorization >1 hr: 291,160 FLee 6,787 475.537' Waste: 0 (18.017) certify that the foregoing is true and correct to the best of my knowledge. Signature 6-7At./Y(1/ 4-4 Title 86,720 TRANSFERRED TO Incl. Late 6 Sold/Inj to Storage 103,306 pe o1 p,n 0rki a 8,221 )' %tpr ✓�� �\ U 9,796 re4 1 as a 18,017 to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 6. Sold 7. Reinjected 8. Flared or vented 1 hour or less 9. Flared or vented more than 1 hour (see inslr.) 10. Pilot and Purge 11. Assist Gas 12. Fuel gas used in lease operations 13. Other (see instructions) 14. TOTAL VOLUME (ITEMS 6-13) 15. NGL Gas Equivalent 16. Purchased gas - Rental Return Gas 17. Transferred from: (Off -lease Gas) 18. Transferred to: Transferred to: Other: certify that the foregoing is Signature Name STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Swanson Storage Storage 18,714 To storage for fuel usage: a to Storage for Injection: 18714 To storage for injection is included in Line 6 as subject to myalty. Hemlock Production Sold 1d correct to the best of my knowledge as a 339 Note: All volumes must be correcte to pressure of 14.65 pale and to a temperature of 60o F. Authority 20 1�L Volume MCF 20. For production from multiple pools, list Total Vc 208,043 Pool Name 0 SWANSON RIVER, HEMLOCK SWANSON RIVER, HEM F/STERLING UNDEF 17 SWANSON RIVER, TYONEK UNDEFINED SWANSON RIVER, BELUGA UNDEFINED 339 SWANSON RIVER, STERLING UNDEFINED 1,272 0 81,489 0 Official U: Authorization >1 hr Safety 291,160 Lease Use 1,396 Conservation 158,288 Waste: 0 n / (18714) Swanson Storage Storage 18,714 To storage for fuel usage: a to Storage for Injection: 18714 To storage for injection is included in Line 6 as subject to myalty. Hemlock Production Sold 1d correct to the best of my knowledge as a 339 Note: All volumes must be correcte to pressure of 14.65 pale and to a temperature of 60o F. Authority 20 1�L OR FLARING EVENTS GREATER THAN 1 HOUR Action Taken to Minimize RpitDaa O No FacilityNo Date Flared Start Time Ending Time End Date Planned MGF Description of Flaring Event Volume Excess flaring due to unscheduled 08/01/2015 124250 1330000002 8/3/2015 10:30:00 PM 11:59:00 PM 8/3/2015 U 14.2 shutdown K-22 caused Excess flaring necessary until compressor K-22 timer issues time by timer issues which led to Compressor K-8 shutdown. fixed. Excess venting due to high Excess venting necessary until 08/01/2015 124250 1330000002 8/4/2015 1:00:00 AM 5:45:00 AM 8/4/2015 U 17.4 temperature shutdown of the compressor could be Compressor K-22. cooled, loaded, and restarted. Excess flaring due to high Excess flaring necessary until 08N1/2015 124250 1330000002 8/4/2015 2:30:00 AM 6:00:00 AM 8/4/2015 U 18.3 temperature shutdown of the compressor could be Compressor K-8. cooled, loaded, and restarted. Excess venting due to unscheduled Excess venting necessary until 08/01/2015 124250 1330000002 8/7/2015 4:30:00 PM 7:00:00 PM 8/7/2015 U 9.1 shutdown of Compressor K-8 which compressors could be caused Compressor K-22 to go down. restarted. Excess flaring due to unscheduled Excess flaring necessary until 08/01/2015 124250 1330000002 8/7/2015 4:30:00 PM 7:00:00 PM 8/7/2015 U 23.3 shutdown of Compressor K-8 caused compressor could be cooled by over heating. and restarted. Excess flaring due to shutdown of Excess flaring necessary until 08101/2015 124250 1330000002 8/9/2015 7:00:00 AM 9:15:OOAM 8/9/2015 p 13.9 Compressor K-8 to replace a bad maintenance could be completed and compressor valve. brought back online. Excess venting due to shutdown of 08/01/2015 124250 1330000002 8/9/2015 7:45:00 AM 9:30:00 AM 8/9/2015 P 6.5 Compressor K-22 caused by maintenance on Compressor K- 8 could be completed and both Compressor K-8 bei ag down for maintenance. compressor brought back Excess venting due to unscheduled Excess venting necessary until OIA1112015 124250 1330000002 8/11/2015 4:30:00 PM 7:30:00 PM 8/11/2015 U 11.1 shutdown of Compressor K-22 caused temperature could be lowered by high common temperature. and compressor restarted. Excess venting due to scheduled Excess venting necessary until 08/01/2015 124250 1330000002 8/13/2015 11:30:00 AM 1:30:00 PM 8/13/2015 p 83 shutdown of Compressor K-22 for maintenance could be preventative maintenance to change completed and compressor the oil and spark plugs. brought back online. Excess flaring due to high compressor Excess flaring necessary until 08/01/2015 124250 1330000002 8/25/2015 9:00:00 AM 1:30:00 PM 8/25/2015 U 40.6 temperature shutdown of the compressor could be Compressor K-8. cooled, loaded, and restarted. Excess venting due to high common Excess venting necessary until 08/01/2015 124250 1330000002 8/25/2015 5:15:00 PM 11:59:00 PM 8/25/2015 U 24.3 temperature shutdown of the compressor could be Compressor K-22. cooled, loaded, and restarted. Excess flaring due to scheduled Excess flaring necessary until 08/01/2015 124250 1330000002 8/26/2015 7:00:00 AM 9:30:00 AM 8/26/2015 P 19.2 shutdown of Compressor K-8 for maintenance could be maintenance to install new valves and completed and compressor new AMOT. restarted. OR FLARING EVENTS GREATER THAN i HOUR - Action Taken to Minimize R Date O No Faoili No Date Flared Start Time EndingTime End Date .Planned MCF Desorption of Flaring Event Volume Excess venting due to unscheduled 08/01/2015 124250 1330000002 8/26/2015 10:00:00 AM 10:00:00 PM 8/26/2015 U 44.1 shutdowns of Compressor K-22 Excess venting Excess venting necessary until ssor could bssary restarted. caused by overheating issues. Excess flaring necessary until Excess flaring due to shutdown of 08/01/2015 124250 1330000002 8/27/2015 7:00:OOAM 11:30:00 AM 8/27/2015 P 42.6 Compressor K-8 to change maintenance could be completed and compressor compressor rings. brought back online. Excess venting due to unscheduled Excess venting necessary until 08/01/2015 124250 1330000002 8/27/2015 7:30:OOAM 1:30:00 PM 8/27/2015 U 22.3 shutdown of Compressor K-22 for compressor could be cooled, high common temperature. loaded and restarted. Excess venting due to unscheduled Excess venting necessary until 08/012015 124250 1330000002 8/28/2015 6:30:00 AM 8:00:OOAM 8/28/2015 U 5.5 shutdown of Compressor K-22 caused compressor could be cooled, by high common temperature. loaded and restarted. Excess venting due to unscheduled Excess venting necessary until 08/01/2015 124250 1330000002 8/30/2015 11:45:00 AM 4:45:00 PM 8/30/2015 U 18.3 shutdown of Compressor K-22 caused the compress or couldbe by high common temperature. cooled, laadedand restarted. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACII ITV RFPr1RT nF PRr1nIICFn r:AR nimionSITVIN rev � 1. Facility Number 1330000002 2. Facility Name 1 Swanson River 3. Field Swanson River Unit 4. Operator I HILCORP ALASKA LLC 5. Month/Year of Disposition I September 2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of Total Volume. of each pool as a percent 6. Sold 196,446 Pool Name Pool Code Percent 7. Reinjected 0 SWANSON RIVER, HEMLOCK 772100 52.57% SWANSON RIVER. HEM F/STERLING UNDEF 772105 0.00% 8. Flared or vented 1 hour or less 3 SWANSON RIVER, TYONEK UNDEFINED 772500 0.62% SWANSON RIVER. BELUGA UNDEFINED 772520 0.00% 9. Flared or vented more than 1 hour (see inslr.) 1,387 it SWANSON RIVER, STERLING UNDEFINED 772550 46.81% 10. Pilot and Purge 2,461 11. Assist Gas 0 12. Fuel gas used in lease operations 65,621 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-13) 285,918 Lease Use MCF 15. NGL Gas Equivalent (mcf) 7,094 • Conservation MCF 16. Purchased gas -Rental Return Gas 146,146 Waste: I MCF 17. Transferred from: (Off -lease Gas) 0 Commissioner Date 18. Transferred to: (41.071) 19. Remarks: SOLD SRU Field to Enstar (royalty -bearing) SRU Field to Enstar (Hemlock Non -royalty) SRU to Storage(myalty- bearing) SRU to Storage (Hemlock Non -royalty) 75,959 79,416 20,074 20,997 TRANSFERRED TO Incl. Line 6 Sold4nj to Storage 41,071 I (•Fi��r^� X11, ]Pe✓ t'vl" cti e113h�` 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Signature-oA++�� ��-u Printed Name Cortne Der - Note: All volumes must be corrected Title Production Anal st to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Phone 713-289-2881 Date 10/13/2017 AAC25.235. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 1330000002 6. Sold 196,446 7. Reinjected 0 8. Flared or vented 1 hour or less 3 9. Flared or vented more than 1 hour (see instr.) 1,387 10. Pilot and Purge 2,461 11. Assist Gas 0 12. Fuel gas used in lease operations 85,621 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6-13) 285,918 15. NGL Gas Equivalent 1,262 16. Purchased gas - Rental Return Gas 0 17. Transferred from: (Off -lease Gas) 0 illi. Transferred to: (44,440) Transferred to: Swanson Storage 44,440 To storage for fuel usage: 0 to Storage for Injectwn'. 44440 To storage for injection is included in Line 6 as subject to royalty. Other: Hemlock Production Sold the foreooine is true and correct to the best of my knowledge Signature Title Production An ted Name Cortnev Dver Phone 713-289-2881 Use as a /30 !0 -Z -9-/s Date Note: All volumes must be corrected to pressure of 14.65 Pala and to a 10/20/2015 temperature of 60o F. Authority 20 vT� Swanson River Action Taken to Mm m¢e RptDate O No Facilg No Date Flared Start Time EndlimiTime, End Date planned MCF Description of Flaring Event Volume Excess venting due to unscheduled Excess venting necessary until 09/0112015 124250 1330000002 9/4/2015 9/4/201521:30 9/4/201523:59 9/4/2015 U 10.7 shutdown of Compressor K-22 caused temperature could be lowered by high common temperature. and compressor restarted. Excess venting due to unscheduled Excess venting necessary until 09/01/2015 124250 1330000002 9/5/2015 9/5/20151:30 9/5/20154:30 9/5/2015 U 11.7 shutdown of Compressor K-22 caused temperature could be lowered by high common temperature. and compressor restarted. Excess venting necessary until Excess venting due to unscheduled maintance on valve covers 09/01/2015 124250 1330000002 9/5/2015 9/5/2015 7:30 9/5/201513:30 9/5/2015 U 21.4 shutdown of Compressor K-22 for could be completed and repairs. compressor brought back online. Excess venting necessary until Excess venting due to unscheduled maintance on valve covers 09/01/2015 124250 1330000002 9/5/2015 9/5/201515:00 9/5/2015 19:00 9/5/2015 U 17.5 shutdown of Compressor K-22 for could be completed and repairs. compressor brought back online. Excess venting necessary until Excess venting due to shutdown of new VRU installation project 09/01/2015 124250 1330000002 9/14/2015 9/14/20158:00 9/30/201523:59 9/30/2015 P 1325.7 Compressor K-22 for installation of a can be completed and replacement VRU. compressor brought back online. 1387.0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 12. Facility Name 13. Field 4. 6. Sold 267,908 7. Reinjected 0 8. Flared or vented 1 hour or less 52 9. Flared or vented more than 1 hour (see instr.) 2,136 10. Pilot and Purge 3,176 11. Assist Gas 0 12. Fuel gas used in lease operations 86,828 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6.13) 360,100 15. NGL Gas Equivalent (mcf) 4,197 16. Purchased gas - Rental Return Gas 133,875 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: (33,288) Transferred to: Swanson Storage for Injection Total 33,288 ' Volume in Line 6 subject to royalty. 20,915 ' Volume NOT subject to royalty (Hemlock H). 12,373 Rental Return: Hemlock Production Sold - To Enstar 87,228 Included in Line 6; NOT subject to royalty. I the foregoing is true and correct to the best of my knowledge Signature .01 -or Title 20. For production from multiple pools, list contribution of each pool as a percent VER.HEMLOCK =M F/STERLING TYONEK UNDEF Use to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 6. Sold 267,908 7. Reinjected 0 8. Flared or vented 1 hour or less 52 9. Flared or vented more than 1 hour (see instr.) 2,136 10. Pilot and Purge 3,175 11. Assist Gas 0 12. Fuel gas used in lease operations 86,828 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6.13) 360,099 15. NGL Gas Equivalent 1,071 16. Purchased gas - Rental Return Gas p 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: (36,621) 19. Remarks Transferred to: Swanson Storage 36,621 To storage for fuel usage: 6 to Storage ror Injection: 36621 To storage for injection is included in Line 6 as subject to royalty. Other: Hemlock Production Sold 87,228 the foregoing is true and correct to the best of my knowledge Unit production from 4— Use pool as a ; 13�, /:2 -/6 -/s Signature ����" I Note: All Volumes must be corrects 7r — Title Production Analyst toressure of 14.65 p psia and to a fad Name Cnnnnv n.,er ..�_ _ _ _ ,....,.._ __ _ temperature of 60o F. Authority 20 VT Swanson River Excess venting due to unscheduled Excess venting necessary until 10/01/2015 124250 1330000002 10/1/2015 0:00:00 15:30:00 10/25/2015 P 2088.9 shutdownof Compressor K-22 caused temperature could be lowered by high common temperature. and compressor restarted. Excess venting due to unscheduled Excess venting necessary until 10/91/2015 124250 1330000002 10/26/2015 12:00:00 15:00:00 10/26/2015 U 26.3 shutdown of Compressor K-22 caused tem perature could be lowered by high common temperature. and compressor restarted. Excess venting necessary until Excess venting due to unscheduled maintance on valve covers 10/91/2015 124250 1330000002 10/26/2015 14:00:00 16:45:00 10/26/2015 U 9.7 shutdown of Compressor K-22 for could be completed and repairs. compressor brought back online. Excess venting necessary until Excess venting due to unscheduled maintance on valve covers 10/912015 124250 1330000002 10/30/2015 2:15:00 3:30:00 10/30/2015 U 11.0 shutdown of Compressor K-22 for could be completed and repairs. compressor brought back online. 2136.0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Name 6. Sold 289,493 7. Reinjected 0 8. Flared or vented 1 hour or less 167 9. Flared or vented more than 1 hour (see instr.) 2,371 10. Pilot and Purge 1,035 11. Assist Gas 0 12. Fuel gas used in lease operations 82,019 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6-13) 375,085 15, NGL Gas Equivalent (mct) 3,649 16. Purchased gas - Rental Return Gas 118,878 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: (203 008) Transferred to: Swanson Storage for Injection Total Volume in Line 6 subject to royalty. Volume NOT subject to royalty, (Hemlock H). Rental Return: Hemlock Production Sold - To Enstar ImJuded in Litre 6: NOT subject to royalty. certify that the foregoing is true and correct to the best of my knowledge. Signature A?%W 203,008 138,663 64,345 27,405 Operator >1 hr: . G -.I,, �y (C✓ pool as a Use 1 r fo—a O� IDILJ tVilla, l Note: All volumes must be corrects, to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Facility 20. For 6. Sold 289,493 7. Reinjected 0 8. Flared or vented 1 hour or less 167 9. Flared or vented more than 1 hour (see instr.) 2.370 10. Pilot and Purge 1,036 11. Assist Gas 0 12. Fuel gas used in lease operations 82,018 13. Other (see instructions) g 14. TOTAL VOLUME (ITEMS 6-13) 375,084 15. NGL Gas Equivalent 1,071 16. Purchased gas - Rental Return Gas 118,878 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: (370,148) Transferred to: Swanson Storage 370,14E To storage for fuel usage: 0 to Storage for Injection: 372448 To storage for injection is idol Wed in Line 6 as subject to royalty. Other: Hemlock Production Sold 27,405 certlty, met the toregomg/iss true a. nd correct tttoo the best of my knowledge. Signature _ ".��LDy Title ted Name Connev Dver Phnn< FAV Safety 1 Use LLC Of pool as a 23-70 —/b Note: All volumes must be correctei to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 VT1- 1/6-//& Swanson River November -15 Excess venting necessary until Excess venting due to a power the power could be restored 11/01/2015 124250 1330000002 11/3/2015 9:00:00 23:59:00 11/3/2015 U 93.6 outage and venting off of TN -22. and equipment brought back online. Excess flaring necessary until Excess flaring due to bringing up the power couldrestored 11/01/2015 124250 1330000002 11/3/2015 9:00:00 23:59:00 11/3/2015 U 543.0 plant and Field following power and equipmentbrought back outage. online. Excess venting due to unscheduled Excess venting necessary until 11/01/2015 124250 1330000002 11/16/2015 14:00:00 16:30:00 11/16/2015 U 15.6 shutdown of the VRU caused by a the cooler could be thawed out frozen cooler. with indirect heater. Excess flaring necessary until Excess Raring due to 20v-1 to VRU the the ice plug in the VRU 11/01/2015 124250 1330000002 11/17/2015 13:00:00 17:00:00 11/17/2015 U 94.0 compressor froze off. suction line could be thawed out. Excess flaring necessary until Excess flaring due to an obstruction the obstruction could be 11/01/2015 124250 1330000002 11/19/2015 10:00:00 23:59:00 11/19/2015 U 53.2 in the VRU liner and freezing issues in cleared and ice from the lines the flare line. thawed. Excess venting due to an obstruction Excess ventingnecessarycould 11/0112015 124250 1330000002 11/20/2015 0:00:00 12:00:00 11/20/2015 U 74 in the VRU pump screen which cleaned the screen could be cleaned caused 1st stage scrubber high and VRU restarted. leveling. Excess flaring due to fan motor Excess flaring necessary until 11/01/2015 124250 1330000002 11/25/2015 0:30:00 5:00:00 11/25/2015 U 40.4. overload. Equipment was not able to the unit could be reset. be restarted immediately. Excess venting due to fan motor Excess venting necessary until 11101/2015 124250 1330000002 11/25/2015 0:30:00 5:00:00 11/25/2015 U 24.9 overload. Equipment was not able to the unit could be reset. be restarted immediately. Bringing on wells after power outage; Excess flaring necessary until 11/01/2015 124250 1330000002 11/26/2015 14:45:00 17:00:00 11/26/2015 U 29.1' 45N Flare compressor could be restarted. Excess venting necessary until 11/01/2015 124250 1330000002 11/26/2015 5:00:00 11:00:00 11/26/2015 U 37.4' Excessing venting due to power the equipment could be outage. restarted. Excess flaring necessary until 11/01/2015 124250 1330000002 11/26/2015 5:00:00 11:00:00 11/26/2015 U 154.7 Excessing flaring due to power the equipment could be outage. restarted. River 11I010015 1 124250 1 1330000002 11/01/2015 1 124250 1 1330000002 11/26/2015 5:10:00 11/26/2015 14:45:00 11:25:00 11/26/2015 16:15:00 11/26/2015 B69 Excessing flaring at main flare due to l Excess flaring necessary until power outage. the wells could be shut in. 341 , I Excessing flaring due to bringing theI Excess flaring necessary until wells on after power outage. compressor could be restarted. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION +.. e✓ FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000002 2. Facility Name Swanson River 3. Field 4. Operator Swanson River Unit I HILCORP ALASKA LLC 5. Month/Year of Disposition December 2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 271,269 Pool Name Pool Code Percent 7. Reinjected0 SWANSON RIVER, HEMLOCK 772100 27.34% SWANSON RIVER, HEM F/STERLING UNDEF 772105 0.00% 8. Flared or vented 1 hour Or less 27 SWANSON RIVER, TYONEK UNDEFINED 772500 1.27% SWANSON RIVER, BELUGA UNDEFINED 772520 0.00% 9. Flared or vented more than 1 hour (see instr.) 83 • SWANSON RIVER, STERLING UNDEFINED 772550 71.38% 10. Pilot and Purge 990 11. Assist Gas 0 12. Fuel gas used in lease operations 91,837 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.13) 364,206 Lease Use MCF 15. NGL Gas Equivalent (mcf) 2,679 Conservation MCF 16. Purchased gas - Rental Return Gas 94,730 Waste: MCF 17. Transferred from: (Off -lease Gas) 0 Commissioner Date 18. Transferred to: (211,653) 19. Remarks: Transferred to: Swanson Storage for Injection Total 211,653 • Volume in Line 6 subject to royalty. 156,601 • Volume NOT subject to royalty (Hemlock H). 55,052 Rental Return: Hemlock Production Sold - To Enstar 15,505 • Inctuded in Line 6; NOT subject to royalty. I the foregoing is true and correct to the best of my knowledge Signature ��x,y Title Printed Name Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000002 2. Facility Name - 1 Swanson River 3. Field 4. Operator Swanson River Unit I HILCORP ALASKA LLC 5. MonthNear of Disposition I December 2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 271,269 Pool Name Pool Code Percent 7. Reinjected 0 SWANSON RIVER, HEMLOCK 772100 27.34% SWANSON RIVER, HEM F/STERLING UNDEF 772105 0.00% 8. Flared or vented 1 hour or less 27 SWANSON RIVER, TYONEK UNDEFINED 772500 1.27% SWANSON RIVER, BELUGA UNDEFINED 772520 0.00% 9. Flared or vented more than 1 hour (see instr.) 82 SWANSON RIVER, STERLING UNDEFINED 772550 71.38% 10. Pilot and Purge 991 11. Assist Gas 0 12. Fuel gas used in lease operations 91,837 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety 82 MCF 14. TOTAL VOLUME (ITEMS 6-13) 364,206 Lease Use MCF 15. NGL Gas Equivalent 919 Conservation MCF 16. Purchased gas -Rental Return Gas 94,730 Waste: MCF 17. Transferred from: (Off -lease Gas) 02-11-/4 / 2 - /1_ / (� `- C missioner DGate PCM"-'-1"W 18. Transferred to: (339771) Transferred to: Swanson Storage 339,771 To storage for fuel usage: 0 to Storage for Injection' 372446 To storage for injection is induded in Line 6 as subject to royalty. Other: Hemlock Production Sold 15,505 certlty that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Production Analyst to pressure of 14.65 psia and to a ted Name Cortnev Over Phone 711-9AQ_99A1 not. v,cron,c temperature of 60o F. Authority 20 V 7- Z/!o/1 L Swanson River December-15 RPIDatis OpNo Facli .Dale Flared Start Tmre Ending Time End Date Planned MCF Description of Flaring Event cbon a en to immize Vdume 12/01/2015 124250 1330000002 12/3/2015 11:30:00 14:00:00 12/3/2015 Excess venting of Tank 22 due to ti Excess venting necessary unlliquid U 22.1 failure of lipoid transfer pump. transfer pump could be restarted. 12/01/2015 124250 1330000002 12/3/2015 11:30:00 14:00:0012/3/2015 Excess flaring due to liquid transfer Excess flaring necessary until U 26.4 pumpfailure. transfer pump could be restarted. Excess venting necessary due to 12101/2015 124250 1330000002 12/19/2015 18:30:00 20:15:00 12/19/2015 U 11.1 unscheduled shutdown of Excess venting necessary Compressor due to high 1st stage stripper gas could be adjusted. suction pressure. 12/01/2015 124250 1330000002 12/26/2015 0:00:00 Ex cess venting due to unscheduled Excess venting necessary until 12:00:00 12/26/2015 U 12.8 shutdown of VRU due to over compressor could be safely pressure restarted. 12/01/2015 124250 1330000002 12/2]/2015 1000:00 Excess venting due to unscheduled Excess venting necessary until 11:30:00 12/27/2015 U 9.6 shutudown of VRU due to compressor could be safety overpressure. restarted. 82