Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
197-020
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: Operable: MPF-42 (PTD# 197-020) IA Repressurization Date:Tuesday, June 13, 2023 9:03:18 AM Attachments:image001.png From: Ryan Thompson <Ryan.Thompson@hilcorp.com> Sent: Monday, June 12, 2023 2:08 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Taylor Wellman <twellman@hilcorp.com>; David Haakinson <dhaakinson@hilcorp.com> Subject: Operable: MPF-42 (PTD# 197-020) IA Repressurization Mr. Wallace, WAG Injector MPF-42 (PTD# 197-020) was brought online UNDER EVALUATION on 4/21/23, the well passed an AOGCC witnessed MIT- IA to 1867 psi on 4/28/23. On 5/15/23 an additional 28 day under evaluation period was approved and the IA pressure was bled to ~500 psi to provide TxI differential. We will now make the well OPERABLE as the IA pressure has been stable during the monitoring period. Below is the TIO plot, please note the SCADA system recorded limited tubing injection pressure data following a plant shutdown on 5/21/23 but is now back operational. Please respond with any concerns. Thank you, Ryan Thompson Milne / Islands Well Integrity Engineer 907-564-5005 From: Wallace, Chris D (OGC) <chris.wallace@alaska.gov> Sent: Monday, May 15, 2023 1:25 PM To: Ryan Thompson <Ryan.Thompson@hilcorp.com>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: David Haakinson <dhaakinson@hilcorp.com> Subject: [EXTERNAL] RE: UNDER EVALUATION: MPF-42 (PTD# 197-020) IA Repressurization Ryan, Your request for additional 28 days monitoring is approved. Thanks and Regards, Chris Wallace, Sr. Petroleum Engineer, Alaska Oil and Gas Conservation Commission, 333 West 7th Avenue, Anchorage, AK 99501, (907) 793-1250 (phone), (907) 276-7542 (fax), chris.wallace@alaska.gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Chris Wallace at 907-793-1250 or chris.wallace@alaska.gov. From: Ryan Thompson <Ryan.Thompson@hilcorp.com> Sent: Monday, May 15, 2023 10:48 AM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: David Haakinson <dhaakinson@hilcorp.com> Subject: UNDER EVALUATION: MPF-42 (PTD# 197-020) IA Repressurization Mr. Wallace, WAG Injector MPF-42 (PTD# 197-020) was brought online UNDER EVALUATION on 4/21/23, the well passed an AOGCC witnessed MIT- IA to 1867 psi on 4/28/23. We would like to request an additional 28 days for additional re-pressurization monitoring to determine if an AA request is necessary for this well. Thanks, Ryan Thompson MPU/Islands Well Integrity Engineer 907-301-1240 From: Jerimiah Galloway Sent: Monday, April 17, 2023 3:38 PM To: 'Wallace, Chris D (DOA)' <chris.wallace@alaska.gov>; Regg, James B (CED) <jim.regg@alaska.gov> Cc: David Haakinson <dhaakinson@hilcorp.com> Subject: UNDER EVALUATION: MPF-42 (PTD# 197-020) IA Repressurization Mr. Wallace, WAG Injector MPF-42 (PTD# 197-020) was made Not Operable after missing it’s scheduled AOGCC witnessed MIT-IA in 2022. Since being shut in, the IA has began to show signs of slow IA repressurization. The well is ready to be returned to injection and evaluated. Per our conversation, the well is now classified as UNDER EVALUATION and placed on a 28 day clock for diagnostics. An AOGCC witnessed MIT-IA will be scheduled once stabile injection has been reached. Please respond with any comments or concerns. Jerimiah Galloway MPU/Islands Well Integrity Engineer Email: jerimiah.galloway@hilcorp.com O: (907)564-5005 C: (828)553-2537 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not anintended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you havereceived this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of thismessage and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus andother checks as it considers appropriate. The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not anintended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you havereceived this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of thismessage and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: UNDER EVALUATION: MPF-42 (PTD# 197-020) IA Repressurization Date:Monday, May 15, 2023 1:25:30 PM From: Wallace, Chris D (OGC) Sent: Monday, May 15, 2023 1:25 PM To: Ryan Thompson <Ryan.Thompson@hilcorp.com>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: David Haakinson <dhaakinson@hilcorp.com> Subject: RE: UNDER EVALUATION: MPF-42 (PTD# 197-020) IA Repressurization Ryan, Your request for additional 28 days monitoring is approved. Thanks and Regards, Chris Wallace, Sr. Petroleum Engineer, Alaska Oil and Gas Conservation Commission, 333 West 7th Avenue, Anchorage, AK 99501, (907) 793-1250 (phone), (907) 276-7542 (fax), chris.wallace@alaska.gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Chris Wallace at 907-793-1250 or chris.wallace@alaska.gov. From: Ryan Thompson <Ryan.Thompson@hilcorp.com> Sent: Monday, May 15, 2023 10:48 AM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: David Haakinson <dhaakinson@hilcorp.com> Subject: UNDER EVALUATION: MPF-42 (PTD# 197-020) IA Repressurization Mr. Wallace, WAG Injector MPF-42 (PTD# 197-020) was brought online UNDER EVALUATION on 4/21/23, the well passed an AOGCC witnessed MIT-IA to 1867 psi on 4/28/23. We would like to request an additional 28 days for additional re-pressurization monitoring to determine if an AA request is necessary for this well. Thanks, Ryan Thompson MPU/Islands Well Integrity Engineer 907-301-1240 From: Jerimiah Galloway Sent: Monday, April 17, 2023 3:38 PM To: 'Wallace, Chris D (DOA)' <chris.wallace@alaska.gov>; Regg, James B (CED) <jim.regg@alaska.gov> Cc: David Haakinson <dhaakinson@hilcorp.com> Subject: UNDER EVALUATION: MPF-42 (PTD# 197-020) IA Repressurization Mr. Wallace, WAG Injector MPF-42 (PTD# 197-020) was made Not Operable after missing it’s scheduled AOGCC witnessed MIT-IA in 2022. Since being shut in, the IA has began to show signs of slow IA repressurization. The well is ready to be returned to injection and evaluated. Per our conversation, the well is now classified as UNDER EVALUATION and placed on a 28 day clock for diagnostics. An AOGCC witnessed MIT-IA will be scheduled once stabile injection has been reached. Please respond with any comments or concerns. Jerimiah Galloway MPU/Islands Well Integrity Engineer Email: jerimiah.galloway@hilcorp.com O: (907)564-5005 C: (828)553-2537 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: UNDER EVALUATION: MPF-42 (PTD# 197-020) IA Repressurization Date:Tuesday, April 18, 2023 8:26:52 AM From: Jerimiah Galloway <Jerimiah.Galloway@hilcorp.com> Sent: Monday, April 17, 2023 3:38 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: David Haakinson <dhaakinson@hilcorp.com> Subject: UNDER EVALUATION: MPF-42 (PTD# 197-020) IA Repressurization Mr. Wallace, WAG Injector MPF-42 (PTD# 197-020) was made Not Operable after missing it’s scheduled AOGCC witnessed MIT-IA in 2022. Since being shut in, the IA has began to show signs of slow IA repressurization. The well is ready to be returned to injection and evaluated. Per our conversation, the well is now classified as UNDER EVALUATION and placed on a 28 day clock for diagnostics. An AOGCC witnessed MIT-IA will be scheduled once stabile injection has been reached. Please respond with any comments or concerns. Jerimiah Galloway MPU/Islands Well Integrity Engineer Email: jerimiah.galloway@hilcorp.com O: (907)564-5005 C: (828)553-2537 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. From:Wallace, Chris D (CED) To:AOGCC Records (CED sponsored) Subject:FW: NOT OPERABLE: Milne Point F-42 (PTD# 197020) IA repressurization Date:Monday, October 25, 2021 9:13:41 AM Attachments:image001.png image002.png image003.png From: Oliver Sternicki <Oliver.Sternicki@hilcorp.com> Sent: Wednesday, October 20, 2021 4:19 PM To: Wallace, Chris D (CED) <chris.wallace@alaska.gov> Cc: David Haakinson <dhaakinson@hilcorp.com>; Regg, James B (CED) <jim.regg@alaska.gov> Subject: NOT OPERABLE: Milne Point F-42 (PTD# 197020) IA repressurization Mr. Wallace, WAG injector Milne Point F-42 (PTD# 197020) was found upon review of long- term annulus pressure trends to show signs of slow IA repressurization while shut-in. The last AOGCC witnessed MIT-IA was conducted on 11/15/2020 which passed to 1800 psi. The well is currently offline and further diagnostics will be conducted as necessary to support an Administrative Approval once the well can be placed back on injection. Annulus pressures will be maintained under MOASP and managed with periodic bleeds as necessary. The well is now classified as NOT OPERABLE until it can be placed back on injection and diagnostics can be conducted. Plan forward: 1. PPPOT-T 2. Monitor for continued repressurization post tubing hanger diagnostics. 3. Request Administrative Approval for continued injection with slow IA repressurization as necessary. Please contact me with any questions or concerns. Regards, Oliver Sternicki Hilcorp Alaska, Hilcorp North Slope LLC Well Integrity Engineer Office: (907) 564 4891 Cell: (907) 350 0759 Oliver.Sternicki@hilcorp.com The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error,you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above,then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systemsor data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Thursday, June 1, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Sully Sullivan P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp Alaska, LLC F-42 MILNE PT UNIT F-42 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 06/01/2023 F-42 50-029-22741-00-00 197-020-0 W SPT 6794 1970200 1698 639 640 640 640 512 645 634 628 OTHER P Sully Sullivan 4/28/2023 initial test after long term shut in 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:MILNE PT UNIT F-42 Inspection Date: Tubing OA Packer Depth 853 1880 1868 1867IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSTS230430082235 BBL Pumped:1.4 BBL Returned:1.4 Thursday, June 1, 2023 Page 1 of 1 9 9 9 9 9 9999 99 9 9 James B. Regg Digitally signed by James B. Regg Date: 2023.06.01 14:41:03 -08'00' Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. /~'~'- ~'~ File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color items- Pages: n GraYScale, halftones, pictures, graphs, charts - Pages: [] Poor Quality Original- Pages: [] Other - Pages: DIGITAL DATA Diskettes, No. n Other, No/Type -OVERSIZED [3 .Logs of vadous kinds [3 Other COMMEN'r~: Scanned by: se~er~ Date.: ~_~/// /s/~ TO RE-SCAN Notes: Re-Scanned by: Beverly Mildred Darelha Nathan Lowell Date: /s/ °+fi'!A A " ft . . re?®'IMAt S .�ia&n rR� *14, 4 m .._ • '+«+m ,. .. ,. .....,.,� -.... _ . . • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 #, Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 0(17 - 0a Mr. Tom Maunder X Alaska Oil and Gas Conservation Commission YAP r P F Y 333 West 7 Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of MPF -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPF -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • III BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) MPF -Pad 10/29/2011 Corrosion Initial top of Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement Vol. of cement pumped cement date inhibitor sealant date ft bbls ft gal MPF -01 1950450 50029225520000 10.2 WA 10.2 N/A 122.4 8/7/2011 MPF -02 1960700 50029226730000 4 N/A 4 N/A 35.7 8/8/2011 MPF -05 1970740 50029227620000 1.3 N/A 1.3 N/A 13.6 8/9/2011 MPF-06 1960020 50029226390000 1.2 N/A 1.2 N/A 15.3 8/2/2011 MPF-09 1971040 50029227730000 5.0 N/A 5.0 N/A 54.4 8/9/2011 MPF -10 1960940 50029226790000 1.7 N/A 1.7 N/A 20.4 8/2/2011 MPF -13 1950270 50029225490000 0.2 N/A 0.2 N/A 8.5 10/6/2011 MPF -14 1952120 50029226360000 0.1 N/A 0.1 N/A 8.5 10/6/2011 MPF -17 1971960 50029228230000 4.1 N/A 4.1 N/A 37.4 8/6/2011 MPF -18 1961000 50029226810000 8.3 N/A 8.3 N/A 91.8 8/2/2011 MPF -21 1961350 50029226940000 1.8 N/A 1.8 N/A 15.3 8/6/2011 MPF -22 1952010 50029226320000 4 N/A 4 N/A 13.6 8/1/2011 MPF -25 1950160 50029225460000 0.3 N/A 0.3 N/A 6.8 10/29/2011 MPF -26 1970840 50029227670000 1.8 N/A 1.8 N/A 11.9 8/1/2011 MPF -29 1961170 50029226880000 6.7 N/A 6.7 N/A 56.1 8/9/2011 MPF -30 1951840 50029226230000 0.8 WA 0.8 N/A 6.8 8/1/2011 MPF -33 2010620 50029226890000 23 Need top job MPF -34 1971970 50029228240000 4.1 N/A 4.1 N/A 13.6 8/1/2011 MPF -37 1950250 50029225480000 0.2 N/A 0.2 N/A 8.5 10/6/2011 MPF -38 1951680 50029226140000 0.3 N/A 0.3 N/A 6.8 10/5/2011 MPF -41 1970950 50029227700000 0.8 N/A 0.8 N/A 8.5 8/9/2011 '" MPF-42 1970200 50029227410000 1.8 N/A 1.8 N/A 13.6 8/1/2011 MPF -45 1950580 50029225560000 8 WA 8 N/A 78.2 8/11/2011 MPF-46 1940270 50029224500000 Sealed Conductor N/A N/A N/A N/A N/A MPF -49 1970030 50029227320000 2.3 N/A 2.3 N/A 18.7 8/11/2011 MPF -50 1970580 50029227560000 1.7 N/A 1.7 N/A 6.8 7/31/2011 MPF -53 1951080 50029225780000 2.8 N/A 2.8 N/A 11.9 9/19/2011 MPF -54 1961920 50029227260000 1.7 N/A 1.7 N/A 10.2 8/1/2011 MPF -57A 2031670 50029227470100 1.3 N/A 1.3 N/A 13.6 8/11/2011 _ MPF -58 1961560 50029227060000 1.7 N/A 1.7 N/A 13.6 7/31/2011 MPF-61 1951170 50029225820000 62 Need top job MPF-62 1951610 50029226090000 2.0 NN 2.0 WA 13.6 9/1/2011 MPF-65 1970490 50029227520000 1.5 N/A 1.5 N/A 13.6 8/11/2011 MPF-66A 1961620 50029226970100 0.8 N/A 0.8 N/A 8.5 7/31/2011 MPF-69 1951250 50029225860000 0.8 WA 0.8 N/A 8.5 8/4/2011 MPF -70 1951530 50029228030000 1.7 N/A 1.7 N/A 15.3 7/31/2011 MPF -73A 2001980 50029227440100 1.5 N/A 1.5 N/A 13.6 8/11/2011 MPF -74 1961080 50029226820000 1.7 N/A 1.7 N/A 13.6 7/31/2011 MPF -77 1951360 50029225940000 0.2 N/A 0.2 N/A 6.8 10/5/2011 MPF -78 1951440 50029225990000 0.7 N/A 0.7 N/A 5.1 7/31/2011 MPF -79 1971800 50029228130000 0.6 N/A 0.6 N/A 6.8 8/3/2011 MPF-80 1982170 50029229280000 0.5 N/A 0.5 N/A 3.4 8/3/2011 MPF-81 2000660 50029229590000 0.9 N/A 0.9 N/A 8.5 8/3/2011 MPF -82 2091350 50029229710000 1.7 N/A 1.7 N/A 15.3 8/3/2011 MPF-83 2000930 50029229630000 12 N/A 12 N/A 13.6 8/3/2011 • MPF -84B 2001760 50029229310200 1.2 N/A 1.2 N/A 10.2 8/3/2011 MPF-85 1982500 50029229360000 0.1 N/A 0.1 N/A 7.7 9/1/2011 MPF -86 2010870 50029230180000 0.8 N/A 0.8 N/A 6.8 8/12/2011 MPF -87A 2032130 50029231840100 1.3 N/A 1.3 N/A 11.9 8/13/2011 MPF-88 2031930 50029231850000 1.3 WA 1.3 N/A 15.3 8/3/2011 MPF -89 2050900 50029232680000 1.2 N/A 1.2 N/A 10.2 8/3/2011 MPF-90 2012110 50029230510000 1.8 N/A 1.8 N/A 18.7 8/3/2011 MPF -91 2051100 50029232710000 1.7 N/A 1.7 N/A 11.9 8/13/2011 MPF -92 1981930 50029229240000 0.8 WA 0.8 N/A 5.1 8/13/2011 MPF -93 2050870 50029232660000 0.3 N/A 0.3 N/A 7.7 9/1/2011 MPF -94 2011700 50029230400000 1.8 WA 1.8 N/A 13.6 8/13/2011 MPF -95 1981790 50029229180000 0.5 N/A 0.5 N/A 3.4 8/13/2011 MPF -96 2081860 50029234060000 0.1 N/A 0.1 N/A 6.0 9/1/2011 MPF -99 2061560 50029233320000 1.3 N/A 1.3 N/A 11.9 8/11/2011 • MEMORANDUM TO: Jim Regg ~~~ b~ZS ~ i o P.I. Supervisor FROM: Bob Noble Petroleum Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: Thursday, June 10, 2010 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC F-42 MILNE PT UNIT KR F-42 Src: Inspector NON-CONFIDENTIAL • Reviewed By: P.I. Suprv vim---- Comm Well Name: MILNE PT UNIT KR F-42 API Well Number: 50-029-22741-00-00 Inspector Name: Bob Noble Insp Num: mitRCN100607094802 Permit Number: 197-020-0 Inspection Date: 6/5/2010 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well F-az 'Type Inj. ~ ~'~TVD 6794~/ IA ~ loo 2oso ~ 1970200 SPT ~ 2pgp / I DA 120 i 390 P.T.D ~TypeTest~psi~ zloo 380 zloo 380 T ~ _ 2380 2390 ~ 2390 2390 Tubing Interval aYRTST per, P Notes: M• n _ (~~j ~L~ -4e~}-prPSS~v~ 1 ~ t$ ~s; I Thursday, June 10, 2010 Page 1 of 1 MEMORANDUM e TO: .~ I"ß1f ¡,(5 (0 (;" Jim Regg P.I. Supervisor FROM: Chuck Scheve Petroleum Inspector Well Name: MILNE PT UNIT KR F-42 Insp Num: mitCS060602075456 Rei Insp Num Packer !Type Inj. I w : TVD !TypeTest i SPT ! Test psi , Interval 4YRTST PIF P Well I F-42 P.T. ! 1970200 '\~ () ~o \C\ State of Alaska e Alaska Oil and Gas Conservation Commission DATE: Wednesday, June 07, 2006 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) lNC F-42 MILNE PT UNIT KR F-42 Src: Inspector NON-CONFIDENTIAL Reviewed By: ~"f?- P.I. Suprv _I. Comm Permit Number: 197-020-0 Inspector Name: Chuck Scheve Inspection Date: 6/I/2006 API Well Number 50-029-22741-00-00 Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. I -- 6794 I IA i 250 2480 I 2460 2460 i 1698.5 ! OA , 0 i 0 I 0 0 i ì ! -- Tubing I 1750 1750 1750 1750 I Notes Pretest pressures were observed and found stable. Well demonstrated good mechanical integrity. ; u'.,"·n.. nJt\\ ~ ~.i 2.00') :jCl'\¡"':"''14:Jj ,,;, I 'J - Wednesday, June 07, 2006 Page I of I ~ STATE OF ALASKA ALASKA Oil AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS -' .,., r--., , 1. Operations Performed: Abandon 0 Alter Casing 0 Change Approved Program 0 2. Operator Suspend 0 Repair Well 0 Pull TubingD Operation Shutdown 0 Plug PerforationsO Perforate New Pool 0 4. Current Well Class: Perforate 0 WaiverD Stimulate 0 Time ExtensionO Re-enter Suspended WeliO Stratigraphic 0 9. Well Name and Number: MPF-42 10. Field/Pool(s): Kuparuk River Field / Kuparuk River Oil Pool, Milne Point Unit 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Representative Dailv Averaae Production or Iniection Data Gas-Mef Water-Bbl Casing Pressure 0 -3665 0 16. Well Status after proposed work: Operational Shutdown 0 Oil 0 GasD WAG Œ GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. SUndry Number or N/A if C.O. Exempt: N/A Title Production Technical Assistant Name: BP Exploration (Alaska), Inc. Development 0 ExploratoryD ServiceŒ 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 41.50 8. Property Designation: ADL-355021 11. Present Well Condition Summary: Total Depth measured 18810 feet true vertical 7485.9 feet Effective Depth measured 18705 feet true vertical 7394.2 feet Plugs (measured) Junk (measured) Casing Length Size MD TVD Conductor 80 20" 91.5# H.40 32 112 32.0 - 112.0 Production 18759 7" 26# L-80 30 . 18789 30.0 . 7467.6 Surface 10868 9-5/8" 40# L-80 31 . 10899 31.0 - 4544.8 Perforation depth: Measured depth: 18425.18465 True vertical depth: 7150.06 - 7184.75 Tubing ( size, grade, and measured depth): 4-1/2" 12.6# L-80 @ 28 18048 Packers & SSSV (type & measured depth): 4-1/2" Baker SABL-3 Packer @ 18012 13 Prior to well operation: Subsequent to operation: Oil-Bbl 0 0 -2138 0 14. Attachments: 15. Well Class after proposed work: ExploratoryD Copies of Logs and Surveys run - Daily Report of Well Operations- 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Printed Name Signature Garry Catron Garry Catron Jd~ (Ð Æfz ~ lji4 íì blroP' j ~ Phone 564-4657 Form 10-404 Revised 12/2003 r c:.f'f ì r ft¡í'q PfE;i . ., ;\ ,H ,,1:'; - -, ,Ice OtherŒJ Convert to WAG 5. Permit to Drill Number: 197-0200 6. API Number 50-029-22741-00-00 None None Burst 1490 7240 5750 Collapse 470 5410 3090 J?~C~/~ , Mlfÿ /! ~D 4l&~ (j ?OO1 ~, 940 Tubing Pressure 2940 3929 Development 0 ServiceŒ Date 11/6/98 OR/GINA! .. ~ r--., . MPF-42 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 10/31/98 Convert surface facilities to WAG service: Rigged up with triplex pump and walked leak test up on water injection lateral to 3000 psi and held for 10 min. then hooked up to gas lateral and walked test up to 4500 psi and also held for 10 min then ROMO. 11/06/98 Put on WAG injection FLUIDS PUMPED BBLS No Fluids Pumped 0 TOTAL Page 1 ... . ,", . > ~ ¡-.,. Tree: Cameron 4", 5M Wellhead: WKM 11" x 11" 5M, FMC wI 11" x 4.5" Tbg. Hnr. wI NSCT threads top and bottom.and 4" CIW H BPV profile 20" 91.1 ppf, H-40 1112' KOP @ 850' Max. hole angle = 76 to 79 deg. II 3,650' to 16,050' Hole angle thru' perfs = 30 deg DLS = 3.4 deg.l100' @ 3,500' 9518", 40#/ft, L-80 Btrc. 110,899' 1 . 4.5" 12.6 ppf, L-80 NSCT tubing (cap. = 0.0152 bpf, drift = 3.958") 7" 26 ppf, L-80, Mod NSCC prod. csg. (drift ID = 6.151", cap. = 0.0383 bpf) Minimum tubing restriction = 3.725" "XN" profile @ 18,033' wlm. Stimulation Summary none performed Perforation Summary Ref log: 3/23/97 AWS GRlCCL Size SPF Interval (TVD) 33/8" 6 8,425.18,465' 7 34' - 7169' DATE 02125/97 REV. BY JBF COMMENTS Drilled cased Nabors 22E 04/14/97 MDO Completion Nabors 4 ES MPU F-42i I- ! " i . j -~ 1"'"'\ Orig. KB Elev. = 41.5' (N 22E) Orig. GL Elev. = 12.2 ' RT To Tbg. Spool = 28.2' (N 22E) 7"x 4.5" SABL-3 Baker Pkr. I 18,010' 4.5" HES 'XN' npl. , (wI 3.725" no-go, 3.813" PB) 118,033 4.5" WLEG 118,047' I I 7" MARKER JOINTS 1/18,258' - 18,299' ~ ~- I ill 7" float collar (PBTD) 118,705' I 7" float shoe I 18,789' I MILNE POINT UNIT WELL F-42i API NO: 50-029-22741 BP EXPLORATION (AK) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELl_ OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _ WAG SWAP Pull tubing _ Alter casing _ Repair well _ Other_X WAG SWAP 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development_ RKB 42 feet 3. Address Explorato~__ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 Service__X Miline Point Unit 4. Location of well at surface 2018' FSL, 2443' FWL, Sec. 06, T13N, R10E, UM (asp's541848, 6035471) MPF-42 At top of productive interval 9. Permit number / approval number .~ ~ .~ .,. .-.. 128' FSL, 4427' FEL, Sec. 24, T14N, R09E, UM (asp's n/a) At effective depth i0. APl number 289' FSL, 746' FWL, Sec. 24, T14N, R09E, UM (asp's 534796, 6049543) 50-029-22741 At total depth 11. Field / Pool 326' FSL, 728' FWL, Sec. 24, T14N, R09E, UM (asp's 534778, 6049580) Miline Point Unit / Kuparuk River Sands 12. Present well condition summary Total depth: measured 18789 feet Plugs (measured) true vertical 7468 feet Effective depth: measured 18705 feet Junk (measured) true vertical 7395 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 112' 20" 250 sx Arcticset 1 (approx) 112' 112' Surface 10871' 9-5/8" 2300 sx PF 'E', 935 sx 10899' 4545' Class 'G' Production 18761' 7" 230 sx Class 'G' 18789' 7426' Perforation depth: measured Open Perfs 18425' - 18465' true vertical Open Perfs 7151' - 7185' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 TBG to 18010' MD. 4-1/2" Tubing Tail to 18047'. . ~ : ... ...... . Packers & SSSV (type & measured depth) 7" x 4-1/2" SABL-3 Baker Packer @ 18010'. No SSV in well. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 09/04/2001 0 0 3058 3494 Subsequent to operation 09/07/2001 0 562 Mscf 0 4661 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations __ Oil __ Gas __ Suspended __ Service WAG Injector 17. I hereby certify that the foregoin is tr e and correct to the best of my knowledge. DeWayne R. Schnorr Prepared by DeWayne R. Schnorr 564-5174 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE MPF-42 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 09/05/2001 SWAP WELL FROM WATER TO GAS. EVENT SUMMARY 09/05/01 WELL SUPPORT SWAPPED BLINDS AND TORQUE TO SPEC. HB&R RIGGED UP AND PRESSURE TESTED TO 4500 PSI. PUMPED 20 BBLS METHANOL DOWN TUBING AND 2 BBLS METHANOL DOWN WATER LEG. JOB COMPLETED WITH NO PROBLEMS AND WELL WAS TURNED OVER TO OPERATOR TO PUT BACK ON INJECTION. FLUIDS PUMPED BBLS DISCRIPTION 22 METHANOL 22 TOTAL Page 1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Cammy O. Taylor go'ff~ DATE' January 5. 2002 Chair u~ if (¥~),,, SUBJECT: Mechanical Integrity Tests THRU: Tom Maunder ~ ~'P"'-_.x~~, BPX *v~ . _.,t,~%'~'~ % Petroleum Engineer-¥.~"'"'- ' F-pad Wells 26i, 42i, 49i, 70i FROM: Lou Grimaldi Milne Point Unit Petroleum Inspector Kuparuk River Field NON- CONFIDENTIAL Packer Depth Pretest Initial 15 Min. 30 Min. WellJ F-26i JTypelnj.I P J T.V.D. J 6819 I TubingJ 3500 I 3500 I 3510 J 3510 JlntervalI 4 P.T.D.I 197-08401Type testI U ITestpsil 1705 I Casingl 910 I 2000 I 1995 I 1995I P/F I P Notes: WellI F-42i I Type,nj.I P I T.V.D. 16745 I Tub,ng 13510 I3510 135~0 I35~0 I,nterva,[ 4 P.T.D.I 197-02001Type testI M ITestpsil 1686 I Casingl 900 I 2000 I 1990 I 1990 I P/F I P Notes: WellI F-491 I Typelnj. J P I T.V.D. I 7090 I Tubingl 2880 I 2880 I 2880 J 2880 I lntervall 4 P.T.D.I 197-0030 TypetestI M ITestpsil 1773 I Casingl 875 I 2000 I 1995 I 1995 I PIE I P Notes: WellI F-70i I Typelnj.[ P J T.V.D. I~ I Tubingl~0 I Intervall 4 P.T.D.I 195-1530 TypetestI M ITestpsil 1739 I Casingl 150 I 2000 I 1990 I 1980 I P/F } __P Notes: Type INJ. Fluid Codes F = FRESH WATER INJ. G = GAS INJ. S = SALT WATER INJ. P = PRODUCED WATER INJ. N = NOT INJECTING Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Test's Details Interval I= Initial Test 4= Four Year Cycle V= Required by Variance W= Test during Workover O= Other (describe in notes) I witnessed the four year Mechanical Integrity Tests on the above injection wells in the Milne Point Field. All wells tested were properly prepped and the tests were concluded successfully. Lee Hulme (BPX rep.) provided all pertinent data and performed a good test on these wells. Well F-41i does not appear to be in compliance with 20 AAC 25.412 (b) which requires that the Packer be within 200 feet (Measured Depth). F-4 l i has 10281 feet between packer and upper perforations. I spoke with Lee Hulme and asked him to research if a dispensation or variance had been granted for this. The wellhouses were all very clean and I was impressed with the neatness of the piping on these wells. M.I.T.'s performed: 4 Attachments: Number of Failures: None Total Time during tests: 4 hours CC: MIT report form 5/12/00 L.G. MIT F pad MPU 1-5-02 LG.xls 1/14/02 Tree: 4 1/8"- 5M CIW MPU F - 26i Orig. DF elev. = 41.2' (N 22E) Wellhead: 11" x 11', 5M FMC Gen...5 .... ~m=. Orig. GL. elev.= 12.2' w/ 11" FMC Tbg. Hng., 4.5" NSCT i ~i: g I RT to tbg. spool = 28.26' (N 22E) lift threads, 4" CIW "H" BPV profile KOP @ 1350' Max. hole angle = 74 to 78 deg. f/4800' to 11,300' Hole angle through perfs = 25 deg. 7" 26 ppf, L-80, BTCM production casing ( drift ID = 6.151", cap. = 0.0383 bpf ) 4.5" 12.6 ppf, L-80 Mod" (drift ID= 3.958" , cap: .0152 bpf ) Stimulation Summary 4.5" HES 'XN' npl. None l::}i:i:~ (wi 3.725" no-go) Perforation Summary Ref Ioq: 5125197 SWS USlT/GR/CCL 7" x 21' marker Jt. f/13,464' to 13,506' Size SPF Interval ('I-VD) 3 3/~ 6 13598-13612 7116-7130 3 3/4 6 ] SWS 34B Hyperjet 2, 20.5 gm charges @ 60 deg. phasing. 0.40' EHD, 21.9" !i ii' penetration 7" float collar (PBTD) [14,036' md --~ · [14,121' md 7" casing shoe DATE REV. BY COMMENTS MILNE POINT UNIT 05/21/97 JBF Drilled and Cased by Nabors 22E WELL F-26i 5/27/97 DBR Initial perle APl NO: 50-029-22767 7/01/97 MDO Completion 4-ES BP EXPLORATION (AK) Tree: Cameron 4", 5M MPUa -r..[~'~[~i Orig. KB Elev. = 41.5' (N 22E) Wellhead: WKM 11" x 11" bM, Orig. GL Elev. = 12.2' FMC w/ 11" x 4.5" Tbg. Hnr. w/ fl ~:~ si [ RT To Tbg. Spool = 28.2' (N 22E) NSCT threads top and bottom.and ~ ':~ 4" CIW H BPV profile ii:i 20" 91.1 ppf, H-40 I 112' KOP @ 850' ii .:ii~i Max. hole angle = 76 to 79 deg. f/ 3,650'to 16,050' i Bi ii~i , Hole angle thru' perfs = 30 deg 4.5" 12.6 ppf, L-80 NSCT tubing !Fi:: ~ (cap. = 0.0152 bpf, ddft = 3.958") ~ Minimum tubing restriction = 3.725" ?: i~ "XN" profile @ 18,033' WIT. :~~ 7.x 4.5-SABL-3 Baker Pkr. Stimulation Summary~ 4.5" HES 'XN' npl. none performed ~ (w/3.725" no-go, 3.813" PR) Perforation Summary Ref Ioq: 3/23/97 AWS GR/CCL 7" MARKER JOINTS +18,258'- 18,299' Size SPF Interval (TVD) 33/8" 6 18,425-18,465' 7 34'-7169' 7" float collar (PBTD)I -- 7" float shoe I 18,789' DATE REV. BY COMMENTS MILNE POINT UNIT 02/25/97 JBF Drilled cased Nabors 22E WELL F-42i 04/14/97 MDO Completion Nabors 4 ES APl NO: 50-029-22741 BP EXPLORATION (AK) ~: ~.-~ o,v~ MPUr '~-49i Orig. DF Elev. = 42.0' (N 22E) Wellhead: 11" x 4.5" adapter on 11" Orig. GL Elev. = 12.1' x11"5MFMCGen5tbg, spoolw/ i! i DF To 7" hng. = 28.5' (N 22E) 11" x 4-1/2" FMC tubing hanger 4- 1/8" CIW H BPV profile iii KoP ~ 300' Max. hole angle = 69 to 72 deg. F ~ 3,~0' to 12,000' }~ ~ .ole an~le thru' po~s = 32 ~ ~'~: O~l~ ~>4 ~.~oo,,~ ~.~ ~ de~. ~ ~2,~00' 7" 26 ppf, L-80, NSCC production casing [~ ~ Two ~ x 20' Marker its. f/14,146' - 14,186' (drifflD=6.151" cap.=0.0383bpf)[':~ ~ Minimum tubing restriction = 3.725" ~ ...~~ "XN" profile ~ 14,020' 7" Baker 'S-3" Packer ~ 13,994' md l Stimulation 8umma~ ~ 4.5' ~fiS 'X~' npl. ~ (w/3.725" no-~o, none pedormed ~ ~ ~.~oration 8umma~ R~f Ioq: GR I G~L sizo ;~F Internal ~4,344' - 14,3~4' po~od W/SWS 24 ~ gm. "big hole" charges (EHD = 0.70", ~ ~P = 7.88") at 45 / 135 deg. phasing. ~ -- 7" float shoe 114,755' md J DATE REV. BY COMMENTS MILNE POINT UNIT 02 / 09 / 97 MDO Drill and Card by Nabors 27 E WELL F~gi 04/15/97 JBF Initial Completion by Nabors 4ES APl NO: 50-029-22741 BP EXPLO~TION .T. ree: 4 1/8"-5M CIW MPU F-70i ,Wellhelad: 11" 5M FMC Gen. 5 w/ ~. Orig. RF elev. = 46.0' (N 27E) 11" x 4.5" FMC Tbg. Hng., 4.5" ~i iii Orig. GL. elev.= 12.0' i~ RT to tbg. spool = 32.69' (N 27E) NSCT threads top and bottom, 4" kOP @ 400' M~. hole angle = 72 to 75 deg. f/ ~' to 12,~0' Hole angle through peals = 36 deg. 7" 26 ppf, L-80, NSCC production rasing ~:~ ( drift ID = 6'151" cap' = 0'0383 bPf ) 4.5", 12.6 ppf, L-80 Btrc. tubing (cap. = 0.0152 bpf, drift = 3.958") ~.~ Minimum tubing restriction = 3.725" ~ .x...ro,i,e. m.. 7~ Baker'S-a" ~acker 1 4,215' m~ Stimulation 8umma~I ¢~: ~ 4.5' HIS 'X~' npl. ~14,238' none pedomed ' ~ ' (w/3.725" no-go) ~' 4.5. WLEG 1~,248, m~I Ce~oration 8umma~ ~ef Ioq: 0~29/96 SBT / GR / CCL Siz( SPF Intewal (~D) Two 7" marker jts. 4.5" 5 14,596-14,696' (7269'-7351') f/14,367' to 14,406' wlm ,. 32.0 gm. AlphaJet charges (EHD = 0.50' ~P: 32.0") ~ 135/45 deg. ~?~ 7" float collar (PBTD) J14,880' mdt 7" casing shoe J14,969' md J DATE REV. BY COMMENTS MILNE POINT UNIT 10/26/95 JBF Drilled and Cased by Nabors 27E WELL F-?0i 03/03/96 JBF WlW completion by Nabors 4ES APl NO: 50-029-22603 03/24/97 JBF WIW Re-completion by Nabors 4~S BP EXPLO~TION THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE JANUARY 03, 2001 M p i A T E E IA L U N u W T H IS M A R K E R C:LORlkMFILM.DOC PERMIT 97-020 97-020 97-020 97-020 97-020 97-020 97-020 AOGCC Individual Well Geological Materials Inventory DATA T DATA PLUS SBT/GR/CCL 700-18645 STAT PRESS ¢~-18250-18500 GR/CCL/PERF ~8350-18570 HYDROLOG ~//18087-18437 CDR-TVD ~/200-7450 ADN-TV]D ~4500-7450 CDR-MD J112-18800 97 - 020 ADN-MD 97-020 8381 S1C0~00-18700 UM CDR/ADN/GR Page: 1 Date: 04/07/99 RUN RECVD FINAL 04/02/97 FINAL 04/02/97 FINAL 04/02/97 FINAL 12/04/97 FINAL 05/07/98 FINAL 05/07/98 FINAL- Q5/07/98 ~INAL 05/07/98 i 05/07/98 10-407 ~/~COMPLETION DATE © ~/// /~2/ DAILY WELL OPS ~R ©~/~/~2/ TO ~t //(~/~/ Are dry ditch samples required? yes /~ And received? Was the well cored? yes ~_~Analysis & description received? Are well tests required?~! yes n~Received? ~~ Well is in compliance ~ Initial COMMENTS ~ I I I T D BOX -- Schlumberger - GeoQuest A Division of Schlumberger Technologies Corporation 500 W. InternaTional Air~oor'[ Road Anchorage, Alaska 99518 - 1199 (907) 562-7669 ('Bus.) (907) 563-3309 (Fax) May 1, 1998 TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 The following data of the Depth Corrected CDR/ADN, CDR/ADN TVD'S for well MPF-42, Job Cf 97109 was sent to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, AK 99519-6612 E-TRANS- 5/1/98 3 Bluelines each 1 Film each State of Alaska Alaska Oil & Gas Conservation Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 I OH LIS Tape 1 Blueline each 1 RF Sepia each OXY USA, Inc. Attn: Darlene Fairly P.O. Box 50250 Midland, TX 79710 1 OH LIS Tape 1 Blueline each 1 RF Sepia each Sent Certified Mail: P 067 695 454 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 Received by L~~"~~ STATE OF ALASKA ALASrv-, ..)IL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: []Operation Shutdown []Stimulate [] Plugging [] Perforate [] Pull Tubing []Alter Casing [] Repair Well [] Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service 4. Location of well at surface 2019' NSL, 2715' WEL, Sec. 6, T13N, R10E, UM At top of productive interval 128' NSL, 4427' WEL, Sec. 24, T14N, R9E, UM At effective depth 251' NSL, 4487' WEL, Sec. 24, T14N, R9E, UM At total depth 567' NSL, 4505' WEL, Sec. 24, T14N, R9E, UM Recover wireline fish 6. Datum Elevation (DF or KBE) KBE: 54' 7. Unit or Property Name Milne Point Unit 8. Well Number MPF-42i 9. Permit Number / Approval No. 97-20 10. APl Number 50- 029-22741 11. Field and Pool Milne Point Unit / Kuparuk River Sands 12. Present well condition summary Total depth: measured 18789' feet Plugs (measured) true vertical 7426' feet Effective depth: measured 18705' feet Junk (measured) true vertical 7353' feet Casing Length Size Cemented Structural Conductor 112' 20" 250 sx Arcticset I (approx) Surface 10871' 9 5/8" 2300 sx PF 'E', 935 sx Intermediate Class 'G' Production 18761' 7" 230 sx Class 'G' Liner MD TVD 112' 112' 10899' 4545' 18789' 7426' Perforation depth: measured 18425'-18465' true vertical 7163'-7197' Tubing (size, grade, and measured depth) Packers and SSV (type and measured depth) None 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments [] Copies of Logs and Surveys run [] Daily Report of Well Operations 16. Status of well classifications as: [] Oil [] Gas [] Suspended Service Water Injection 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Chip Alvord ~ ~' ~,~ Title Engineering Supervisor Date .~/2-.~'l / - Prepared By Name/Number: Mary Youngers 564-5242 Submit In DupliC~ Form 10-404 Rev. 06/15/88 '"-- ' te of Alaska /-,~aska Oil & Gas Conservation Comm. Atten: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Transmittal of Final Prints. Please sign and return copy to' Western Altas Logging Services Pouch 340013 Prudhoe Bay, AK 99734-0013 02-Dec-97 iiWell Name Services Bluelines ~R/F Sepia 1 !Hydrolog/Gamma Ray 1 0 '-Received by: (~ I Contact Rebecca Lange if you have a question concerning this transmittal at (907) 659-2816 or Fax (907) 659-2602. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG REVISED: 12/01/97 1. Status of Well Classification of Service Well ~--] Oil [] Gas ~]Suspended ~JAbandoned [] Service Water Injection 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 97-20 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22741 ~ . 4. Location of well at surface ~r 9. Unit or Lease Name 2019' NSL, 2715' WEL, SEC. 6, T13N, R10E, UM "?~ ""~""~'~"~~~~ " l Milne Point Unit At top of productive interval '.i., c'")"/.~..-,f 10. Well Number 161' NSL, 4468' WEL, SEC. 24, T14N, R9E, UM;i ~~ ~ MPF-42i At total depth -'1 ~ .~r~,;~-'~ t 11. Field and Pool 337' NSL, 4552' WEL, SEC. 24, T14N, RDE, UM Milne Point Unit / Kuparuk River 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Sands RTE = 54'I ADL 355021 12. Date Spudded2/5/97 113' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'115' Water depth' if °ffsh°re 116' N°' °f C°mpleti°ns2/20/97 4/11/97 N/A MSL, One 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD)119. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 18810 7486 FTI 18705 7394 FTI [~Yes []NoI N/A MD [~) 22. Type Electric or Other Logs RunI'~ !..~. i.. ! ¥ L. L~ Gyro, MWD, GR/RES, CDR/CDN, GR/CCL, SBT 23. CASING, L,NER AND CEMENT,KG RECORD D J::'C -- __ CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP Bo'FrOM SIZE CEMENTING RECORD ,~I~J~ITr,~PJJI,,L~_.~_ 20" 91.1# H-40 34' 110' 24" 250 sx Arcticset I (Approx.) 9-5/8" 40# L-80 32' 10899' 12-1/4" 2300 sx PF 'E', 935 sx Class 'G' 7" 26# L-80 28' 18789' 8-1/2" 230 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 3-3/8" Gun Diameter, 6 spf 4-1/2", 12.6#, L-80 18047' 18010' MD TVD MD TVD 18425'-18465' 7150'-7185' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST '"'"" '"' NAL DateApriiFirst 1Pr°ducti°n7, 1997 IMethOdWaterOflnjectiOnOperatiOn (Flowing, gas lift, etc.) U K Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None on Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. TKUp Marker Name Geologic Markers Measured Depth True 18248, 6997, 18402, 7130, 18413, 7140, interval Formation Tests all fluids RECEIVED Signed on Daily Reports DEC - 199 and COrrect & Gas Cons, Commission MPF-42i 97-20 ~ ~o. lA- i leer ~Val NO, ~- ' GENERAL: This form ~/A/urnber., Kathy Carnpoarnor, 564-5122 leases in Alaska. is designed for SUbmitting ITEM 1: Classiflcat. a COmplete and COrrect Well COmpletion SUpply for ini ~,~..~on, of Servic .e_., e W. e. lls. Gas m. ie..ct..ion, Water injection, report and Icg on all types of lands and ~'~ ~' °t:)Servation, : ' · · ITEt~ 5: Indicate rejection for ~n S~tu combustion, steam injection, air injection, salt Water disposal, on this form and Which elevation is , in any attac ~.._. used as reference · h'"~rs. (Where not Otherwise shown) for depth measurements given in Other spaces ITEM 16AND24: If '. Water .16' and in item .,~ th. is Well is c ,.~,.,_ . Interval +.. ,_ '" <~ Snow th.. _ o,,,~,~utec/for ,u ce Separat~,~,. _"~ producinn ~,,,_ °~.parate Pro,~ ..... _ '~'Y produced ,.~?_ "'.'ervals for One,..~-~uon from m,', , o. OWmg the dat~ "..,~n.e interval reoo~,~m..?n.. One interv ... ITEM 21: Indicate Whether from ground level (GL) or Other elevation (DF, KB, etc.)..,, ,u~ eact] additional '~ ,~mnent to such'~/;'e%u,., ,.n i,em 27. ITE. 2;3: Attache , ~,val. u, mta separate'-~/~,.;~_s_o s!ate in item the Cementing to"dol. SUpPlemental records for this Well Should Show the details of any multiple Stage Cementing and the location of IT~ 27: Method of Operation: Other-explain. Flowing, Gas Lift. Rod Pump, Hydraulic Pump. SUbmersible. Water Injection, Gas Injection. Shut-In. ITEM 28: If no COres taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Performance EnqUiry Report Operator BP Exploration Date 00:55, 28 Aug 97 Page 1 The analysis is from - 01:00, 16 Feb 97 - to - 01:00, 16 Feb 97 Programs in Result Table: MPF-42 Well Type Time From Time To Duration Description E.M.W.(equivalent mud weight) MPF-42 Event 01:00, 16 Feb 97 01:00, 16 Feb 97 0 hr 0 min Obtained leak off 13.200 Hole Size MDR 8-1/2 MILNE POINT, ALASKA TO: Rossberg/Hill FROM: Hinkel/Fox Well Name: IMPU F-42i Main Category: ICompletion Sub Category: IE-line Operation Date: 103/23/97 Date: 103/27/97 WHP: 0 psi AFE: 347060 Temp: -33° Wind Chill: -64° Objective: This newly drilled well is to be prepared for the initial completion by the workover rig. This preparation consists of the following E-Line operations: gyro survey, cement bond log (Atlas SBT), perforate 40' of the 'A' Sand, measure the static bottomhole pressure. Sequence of Events: 03/23/97 08:00 MIRU AWS Unit # 6555. Hold safety and pre-job meeting. (Note: Due to extremely long tool length, it was decided to run the Gyro log separate from the GR/CCL/SBT). 11:00 Pick-up 4 _" rollers and Gyro Data tools. 11:15 Start run in hole. Make "station stops" as directed by the Gyro Data service hand. 16:15 Set down at 18,575 ft md (un-corrected). 16:30 Start out of hole (line tension 3090 lb.). Make "station stops" as directed by Gyro Data service hand. 21:00 Finished out of hole. Lay down Gyro tools. Close in well for night. Operations to resume in A.M. 03/24/97 07:00 Rig down Atlas equipment and move out of the way to allow Well Tie-in Group to begin work on F-461 tie-in. Also have generator problems with AWS logging unit. Decide to take to shop for repairs. Will resume operations when repairs are completed. 1600 MIRU Atlas E-Line unit. RIH w/(60' 8", hanging wt. = approx. 620 lb.) SBT tool on 5.5" rollers. Configuration: 5.5" roller sub, VDL, 5.5" roller sub, SBT (centralized arms), roller sub, acoustilog, GR/CCL, 4.5" roller sub, swivel, cablehead. Running speed and weight reasonable at 200 - 250 fpm at 150 lbs. Carefully tag bottom at 18,665'. PU - pulling 800 lbs. over line weight tot get off bottom ('sticky"). Log to 10,700' (did not need that much SBT but needed GR/CCL correlation log to surface casing). POOH. - 2400 OOH. RD Atlas equipment. Suspend operations for the night. 03/25/97 1500 MIRU Atlas E-Line equipment. PU~3 3/8" x 20' hollow carrier gun (loaded 6 jspf w/22gm Jumbo Jet charges) w/4 5/8" roller sub below and GR/CCL, 4 5/8" roller sub, swivel, and cable head above. Attempt to stab into BOPS. Insufficient clearance at rollers. Replace 4 5/8" rollers w/3 5/8" rollers (on 3 3/8" body). 1800 MU lubricator and PT to 1000 psig - OK. RIH. Toolstring setting down between 3800' and 4050' (first 79 deg. interval). POOH. Grind down (6) original 4 5/8" rollers to approx. 4.5" and re-install on 3 5/8" roller sub body. Hanging weight = 480 lb. 1930 RIH w/modified roller assembly. Running weight / speed reasonable at 200 to 250 fpm w/ approx. 150 lb. line weight. Tied into short joints. Correct depths + 14'. RIH - avoid tagging bottom. Make tie-in pass - correct + 2'. RIH, Log into position (CCL at 18,443', 2' from CCL 23OO to top shot). Pwh = 0 psig. Detonate gun perforating from 18,445' to 18,465'. Log off and POOH. Pwh = 0 psig. CCH - all shots fired. Pwh = 0. RDMO. Suspend operations for the night due to anticipated rig (N4ES) move from F-701 to F-54. 03/26/97 1500 Rig move completed by approx. 1430. MIRU Atlas E-Line Unit. 1630 MU 20' x 3 3/8" gun assembly with 4.5" rollers identical to the first perf. run. RIl~'w/o any restrictions. Tie into short joints and correct depth by 15'. RIH - avoid tagging bottom. Make tie-in pass - correct + 2'. RIH, Icg into position (CCL at 18,423'). Pwh = 0 psig. Detonate gun perforating casing from 18,425' to 18,445'. Log off and POOH. Pwh = 0 psig. 2100 - CCH. All shots fired. PU centroller, HP pressure / temp. tool, GR-CCL, 4.5" roller sub, weight bar, 4.5" roller sub, swivel, cablehead. Tool hanging weight = 360 lb. Running speed / weight reasonably good - no restrictions. Correlate depth and correct. RIH - avoid tagging bottom. PU to place pressure sensor at 18,441.5' wlm (3.5' above mid perf. depth) and monitor pressures. Intial pressure and temp. = 3144.7 psia and 174.6 deg. F. Monitor pressures for 45 min. Final pressure = 3144.1 psia and 175.8 deg. F. Pressure determined to be stable so POOH. 0130 - CCH. RDMO Atlas E-Line unit. Results' Atlas was utilized for this well due to the anticipated need for their tractor system high hole angles. As it turns out the tractor system was not required. Large rollers and" standoff appear to be instrumental in getting down. At slightly over 79 deg. this is the highest hole angle successfully logged unassisted at MPU. Gyro was performed by Gyro Data on Atlas E-Line as per procedure. Segmented Bond (cement bond) Icg was performed. It indicates poor cement bonding throughout. The casing was subsequently perforated with the understanding that further evaluation of the cement bonding may be required in the future. This Icg was run w/ GR/CCL on magnetically marked line and will be the primary correlation Icg for this well. Depth relative to the open hole MWD Icg were 10' shallow. PBTD was tagged at 18,665' wlm. Bottom was "sticky". Pulled 800 lb. over to pull free. Perforations were placed as per procedure by lithology from 18,425' - 18,465' wlm w/hollow carrier guns loaded 6 JSPF w/22 gm. JumboJet charges (Section I EHD = 0.76", 1-FP - 6.4"). A stable static bottomhole pressure / temperature of 3144.2 psia / 175.8 deg. F was measured at 18,441.5' (3.5' above mid perf.). Pressure decreased 0.4 psi during the 45 min. survey_ period. This pressure will be instrumental in determination of the utility of this well. E-Line completion operations are complete at this point. Additional E-Line operations (ex. install RBP) may be req'd prior to the rig moving on. No diesel / methanol used. (~ALASKA*O eare. d rVlCOS rilling BP Exploration / Arco Date: To: Attn: From: Subject: December 1, 1997 Alaska Oil & Gas Conservation Commission Steve McMains Kathy Campoamor Technical Assistant 10-407 for Permit #97-20, MPF-42i I am submitting a revised Well Completion Report (10-407) for MPF-42i. The revision now contains 'At Top of Productive Interval', 'At Total Depth', and the the geologic markers. There are also changes in the calculations to all previous TVD's by now using the Gyro survey. We apologize for any inconvenience this may cause, but we did not have the geologic marker information when the original completion report was filed. The directional surveys and summary of daily drilling operations have previously been filed with the Commission and there are no other changes. Regards, Kathy Campoamor 564-5122 /klc Logging Services TO · WHOM IT MAY CONCERN FROM' LARRY KOENN (WESTERN ATLAS LOGGING SERVICES) SUBJECT · HYDROLOG - WELL MPF-42I On 30-Nov.-97 a Hydrolog Survey was run on Milne Point Unit Well No. MPF-42I, the following is my interpretation of that survey. This well has open perforations from depths of 18,425' to 18465'. The survey was conducted with the well on injection at rates from 3460 to 7200 Barrels Per Day. A background measurement was taken at 18,437' and that data was used to background correct subsequent stationary data points. Up Flow was recorded at 18,415' and 18,405' with the well on injection at 6800 and 7200 BPD. Additional stationary measurements were taken at depths of 18,400, 18,390', 18,375', 18,250', and 18,087' showing no up flow with the well on injection at 6800 BPD. The Log Data looks normal and is representative of the Hydrolog Tool, I don't see anything unusual or misleading about the Log Data. Feel free to contact me for any additional information. Thanks Larry D. Koenn Western Atlas Logging Services (907) 563-3233 or (907) 659-2642 Western Atlas International, Inc. 5600 B Street, Suite 201 Anchorage, Alaska 99518-1686 Tel (907)563-3233 Fax (907)563-7803 New Address: P.O. Box 243085 Anchorage, AK 99524-3085 New Fax: (907) 563-5936 t iz '0 / . . ..... ~8~87 STO~ -. ~5~ .~5~ I 8d~B ST~3B I 4. ~2 1825~ ST~SA - . 5 I 8 , 145 ~8~75 ~T~ --. }~? . 2~ ~OMM~NT5 NO ~LOW INJ NO FLOW UP FLOW [NJ NO FLOW NO PLOW INJ FLOW ~T/MiN ~4~ ~O I ~48~ 8~0 I HYDROLO~ ANALYSIS ATLAS WIRWnINE SERVICW. COMPANY NAME: BP EXPLORATION WELL NAME: --MPF - 42 FIELD : --~ILNE POINT STATE & CO.: -NORTH SLOPE; ALASKA DATE: --30-NOV-97 m -- COMMENTS: ........ UP FLOW FOUND FROM 18415' TO 18408'. NO INDICATION OF UP FLOW ABOVW. 18405' . RECORDED BY: L. KOENN WITNESSED BY:-H. THAC~ TOOL ~: --081270 DEPT~ EILE: OXYGER COMMENTS: FEET $S. LS ISS 18437 ST01A 4,713 .223 3022 m~m--mmm ~WWm DEPTH FILE ~ FLOW IND. COMMENTS: CALCULATED ILS sS LS ~mmmmm 112 .0016 ,0020 ,mmmmmmmmmmmm 18415 m~m--mm 18405 18087 18415 18405 18087 18250 18375 SS LS ~--~m~ .mmm..mm. 4mm .m m m mmm m m m m ~T0ZA -1.50 .084 ST03A .083 .095 m ST04A -.454 .054 ST02B §,786 1,850 ST03B 14.02 3.904 ST04B -.564 STO5A - . 518 . 145 mmmm mam m m m N ~m m ,mm mmm m m mmm, m ST06A -.167 ,261 ----~mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm NO FLOW INJ. 3460 BPD NO FLOW INJ, 3460 BPD ~mmm mmmmmmmmmmmmmmmmmmmammem NO FLOW INJ. 3460 BPD UP FLOW ~NJ. 7200 BPD UP FLOW INJ. 7200 BPD ~mmm. mmmmmmmm----~mmm NO FLOW INJ. 7200 B~D NN~ mmmmmmmmmN,e,mmm ~0 FLOW I~. BSO0 ItPD NO FLOW INJ, 6800 BPD VELOCITY F /M N 0 0 mmmmm mm mm mm m 0 6.7 6.0 mm mm mmmm mmm m 0 mmmmmmm 0 m m~ m mm emm~ mm m m m, 0 · mmmm----, m~ mmmmmmmmmmmmmmmm .... ~mmmmmmmmmmmww 18390 IST07A .058 .3331N0 FLOW INJ. 6800 BPD I 0 18405 IST03C 13.72 3,350{ UP FLOW .INJ, 6800 BPD I 5.43 ~84oo 15 08A . 651Ro FLOW INa. 6800 BPD I 0 ~mmmmmm~m-- ..... ~mmmmmmmmW mmmmmmmmmmmmmmm N) m~mmmmmmmmmmmmm~mmmmmmmmmmmm OXYGEN ACTIVATION ANALYSIS ATLAS WIRELINE SERVICES Date ComDan¥ Name Well Name Field Name County Name Stat~ ~ame Service Name Bk, g, F.41e Name D~sk File Name Tool Position Real Time Station Number 01-JAN-80 BP EXPLORATION. (ALAS~) INC. M~F - 42 MILNE POINT NORTH SLOPE HYDROLOG STIA. DAT ST1A, DAT UP 200,0 2 Spectrum Nu~er : 1 Comment : DEFAULT HEADF~R Time OXYGEN SS (cts) BKG sS (cts) FLOW IND. SS (ets) 4.713 +/- .363 4.713 +/- .363 .000 mmN--Ql~mmmmm----mmmmmmmmmmm~Nmmmmmmmm~e__~mmmmmm__m__~memm~mmmmmmmmmm4e__mmemmmmmmm OXYGEN LS (ct~) BKG LS (ets) FLOW IND. LS ,223 +/- ,079 ,223 +/- ,079 .OOO mmmmm--m--mmmmmmmmm~NN~Nmmmmmmm~Nmmmmmmmm41~mmmmmmmmmmm mmm VELOCITY (ft/min) LODR ISS (cts) ILS (ets) GR (ors) BGR (~ts) ,000 +/- .000 22.38 3022, 112, 70,8 1952.0 mmmmmmmmmm--mmmmmmm4llN~m--mmmmmmNl~m__mmmmmN~Qmemm__mmmmmmmmmmmmmmmmm4emmmmmm__mmm # CYCLES SYNCS/CYCLE # BKG GATES BKG WIDTH U~ SPACING ft SS LLD LS LLD 5603 28 16 400,0 1,31 Z40 240 OXYGEN ACTIVATION ANALYSIS ATLAS WIRELINE SERVIC;.S Date company Name Well Name Field Name County Name State Name Service Name Bkg. File Name Disk File Name Tool Position Real Time Depth Station 01-JAN-80 BP EXPLORATION (ALASKA) INC. MILNE POINT NORTH SLOPE HYDROLOG INFJ~%STI C CORRELATION STO3A.DAT UP 200.0 18405.0 4 Spectrum Number : Comment : 20 ' ABOVE Time 03:48:53 OXYGEN SS (cts) BKG SS (cts) 5.159 +/- .379 5.076 +/- OXYGEN LS (cts) BKG LS (cts) .307 +/- .092 .212 +/- .376 ,077 FLOW IND. SS (cra) · 083 , FLOW IND. LS (ct-~) .095 VELOCITY (ft/min) LODR ISS (ets) ILS (ets) GR (ets) BGR (ct~) .000 +/- .000 36.50 3172. 106. 111.5 1950.2 ~ CYCLES SYNCS/CYCLE ~ BKG GATES BKG WIDTH u~ SPACING ft SS LLD LS LLD 5603 28 16 400.0 1.31 240 9.40 OXYGEN ACTIVATION ANALYSIS ATLAS WIRELINE SERVICES Company Name Well Name Field Name County Name State Name Service Name B~g. File Name Dzsk File Name Tool Position Real Time Depth Station N~mber O1-JAN-80 BP EXPLORATION (ALASKA) INC. DF - 42 MILNE POINT NORTH SLOPE HYDROLOG INELASTIC CORRELATION ST04A.DAT UP 200.0 18087,0 5 Spectrum Number : 1 Comment ~ 40' BELOW TUBING TAIL Time 03:58:09 OXYGEN SS (ct~) BKG SS (cts) FLOW IND. SS (cts) 3,793 +/- .325 4,247 +/- .344 -.454 --~amm~mmmmmmmmm~N~mNN~ NmmmmmmmmmmmmmNm~ mm--mmm~ .251 +/- .0B4 .197 +/- .074 .054 ~emm--emmmmm--NmN--Nmm--mm--mmmmmmmmm--mmmm--memmmNmmmwNmmmmmmmmmmmmmmmm~mmmmmmmmmmmm VELOCITY (ft/min) LODR ISS (ets) ILS (ets) GR (ct~) BGR (ets) .000 +/- .000 38.41 2654. 99. 116.7 1949.3 mN--mmmQ~Nmmmmmmmmmmm--mmmmm--mmmemmmmemmmmmmNNmmmmmmmmmmmm--mmm--mNm~4Nmmmmmmmmmme # CYCLES SYNCS/CYCLE # BKG GATES BKG WIDTH us SPACING ft SS LLD LS LLD 5603 ~8 16 400.0 1.31 240 240 ******************************************************************************* OXYGEN ACTIVATION ANALYSIS ATLAS WIRELINE S~RVICES Date Company Name Well Name Field Name County Name State Name Service Name Bkg, File Name Di~k Pila Name Tool Posi%ion Real Time Depth Station Number : 01-JAN-80 : BP EXPLORATION (ALASKA) INC, : I~F - 49. ~ MILNE ~0I~T : NORTH SLOPE : ALASKA : HYDROLOG : INELASTIC CORR~LATION '. ST02B : 200,0 18415,0 Spectrum Number : 1 Comment : 10' ABOVE PERF, 7200BPD Time 04:15:20 ******************************************************************************* OXYGEN SS (ets) BKG SS (ct~) FLOW IND, SS (ct~) 10.595 +/- .544 4.809 +/- .366 5.786 NmmNmmmmmmNmNNN{mmmmmlmmmmmmmmmmmN~{mNmmmmmammNmmm--mweNdN~N~--mmmNmmmmwmmmmmmmm OXYGEN LS (cts) BEG LS (cts) FLOW IND, LS (ct~) 2.091 +/- ,241 ,241 +/- ,082 1,850 mmmmmm{mwm{{ .--4Nm mm V~LOCIT¥ (ft/min) LODR ISS (ct~) ILS (cts) GR (cts) BGR (cts) 6,715 +/- 1,051 21,08 3006. 120. 143.4 1953,1 mQN~mmm{mmemmmmmNme{~NNNWmm{mmmmmmmmmmmmmmN~{{{~mmmmmmmmmmmmmmm--emmmmmmmmmm4--~ ~ CYCLES SYNCS/CYCLE # BKG GAT~ BKG WIDTH us SPACING ft SS LLD LS LLD 5604 ZB 16 400.0 1.31 240 240 ******************************************************************************* OXYGEN ACTIVATION ANA~Y$IS ATLAS WIRELiNE SERVICES Date Company Name Well Name Field Name County Name State Name Service Name Bkg. File Name Di~k File Name Tool Position Real Time Depth Station Number : O1-JAN-80 : BP EXPLORATION (ALASKA) lq~C. : MPF - 42 : MILN~ POINT : NORTH SLOPE :ALASKA : HYDROLOG : INELASTIC CORRELATION : ST03B.DAT : UP : 200.4 : 18405.0 : 7 spectrum Number : 1 Comment : 20' ABOVE PERF, 7200BPD Ti~e 04:22:3~ OXYGEN SS (cts) BKG SS (cts) FLOW IND. SS (ces) 18.728 +/- .722 4.712 +/- .363 14.016 OXYGEN L$ (ots) BKG LS (otB) PLOW IND. LS (cts) 4.118 +/- .339 ,215 +/- ,077 3.904 ~mmNNWmmmmmmmmmmmm~ .... mWm__mmmm__mMWmmmmmmNwmmNmmmmmWmmmmmmmmmmmmmmme~ VELOCITY (ft/min) LODR ISS (uts) ILS (cfm) GR (cts) BGR (cts) 5.989 +/- .497 34.89 2945. 107, 109,5 1953.2 mmmmmmm~m--mmmm--mmmm------ N~mmmmmmmmNmmmmmmm____Nmmmmmmmm~emmmmmmmmemm~ ~ CYCLES SYNCS/CYCLE # BKG GATE~ BKG WIDTH us SPACING ft SS LLD LS LLD 5615 28 16 400.0 1.31 240 240 OXYGEN ACTIVATION ANALYSIS ATLAS WIR~LINE SERVICES Date Company Name Well Nam® Field Name County Name Sta%e Name Service Name Bkg. File Name Disk Pile Name Tool Position Real Time Depth Station Number 01-JAN-SO BP EXPLORATION (ALASKA) INC. HPF - 42 MILNE POINT NORTH SLOPE HYDROLOG INELASTIC COR~RTATION ST04B. DAT UP 200.0 18087.0 9 spectrum Number : 1 Comment : 40' BELOW TUBING TAIL, 7200BPD Time 0A: 38: 48 OXYGEN SS (ets) BKG SS (cts) FLOW IND. SS (¢=s) 3.513 +/- ,313 4.077 +/- .337 -.564 m'~m ~m e~' ~'~' mW m m m mmmmm m m mm ~mmm~ ~m 4m~ ~mm~m m m mm m m.m m______ ~ ~__ m m OXYGEN LS (ets) BKG LS (cts) .446 +/- .112 .188 +/- .072 mmm mm m m mm mmm mm~mm~ ~'~ 4~ W m-- m mm mmmmmw --~-- · VELOCITY (ft/min) LODR ISS (cts) ILS (ets) GR (cts) BGR (ets) · 000 +/- . 000 39 . 83 2548 . 94 . 112.5 1954,4 mm mmmm mmm mm m mmm m~m~ 4~' Bm-- m mmmm mmmm------~mm m mm ' .mmmmmmmmmm mmmmmmmm ~ CYCL~.S SYNCS/CYCLE ~ BKG GATES BKO WIDTH us SPACING ft SS LLD LS LLD 5604 28 16 400.0 1.31 240 240 FLOW IND. LS (cra) OXYGEN ACTIVATION ANALYSI ATLAS W/RELINE SERVICES Date Company Name Well Name Field Nam~ County Name State Name Service Name Bkg, File Name Disk File Name Tool Position Real Time Depth Station Number : 01-JAN-80 : BP EXPLORATION (ALASKA) INC, : F~F - 4~. : MILN~ POINT : NORTH SLOP~. : ALASKA : HYDROLOG : IN~3~.~TIC CORRELATION · - ST0SA. DAT : UP : 200.0 ; 182.5o. o · spectrum Number : 1 Comment : IN~ 6800BPD Ti~e 04: 49: 3 0 OXYGEN SS (ct~) BKG SS (cts) 3.570 +/- .316 4.087 +/- ,338 0XYG~N L$ (cts) BKG LS (ets) · 33~ +/- .097- .189-+/- .073 N~mNeNNNmmm .~mmmm~Nmm~mmmmm~e~NN~ FLOW IND. SS (ors) -.518 FLOW IND. LS (cts) · 145 V~LOCITY (ft/min) ~ODR ISS (ets) ILS (ets) GR (cts) BGR (cts) · 000 +/-- .000 38.22 2554. 95, 137,6 1954.9 N Nmmmmmm! ~mmmmmmN Nm CYCLES SYNCS/CYCLE # BKG GATES BEG WIDTH us SPACING ft SS LLD LS LLD ~03 2~ 16 400,0 1,31 240 240 ******************************************************************************* OXYGEN ACTIVATION ANALYSIS ATLAS WIRELINE SERVICES Date Comgany Name Well Name Fiel~ Name County Name Service Name Bkg. File Name Disk File Name Tool Position Real Time Depth Station Number 01-JAN-80 BP EXPLORATION (ALASKA) INC. MPF - 4~. MILNE POINT NORTH SLOPE HYDROLOG INF/~TIC CORRELATION ST06A.DAT UP 2O0.0 18375.0 12 S~ectrum Number Comment = INJ 6800BPD Time 04:59:15 ******************************************************************************* OXYGEN SS (etS) BKG SS (ets) FLOW IND. SS (ct-~) 4.099 +/- .338 4. 265 +/- .345 -.167 OXYGEN LS (otb) BKG L$ (cts) FLOW IND. LS (cts) .474 +/- .115 .213 +/- .077 .261 ~ELOCITY (ft/min) LODR ISS (cts) ILS (ets) GR (cts) BGR (cts) .000 +/- .000 36.85 2666. 107. 123.4 1959.0 ~ ~Nmmmmmmmmmmmmmmm ~ CYC?.RS SYNCS/CYCLE $ BKG GATES BKG WIDTH us SPACING ft SS LLD LS LLD 5604 28 16 400.0 1.31 240 240 OXYGEN ACTIVATION ANALYSIS ATLAS WIRELINE SERVICES Date Company Name Well Name Field Name County Name state Name Service Name Bkg. File Name Disk Pile Name Tool Position Real Time Depth Station Number : 13 Spectrum Number : 1 Comment : INJ 6800 BPD -' 01-J~/,T-8 0 : BP EXPLORATION (ALASKA) INC. : MPF - 42 : MILNE POINT ; NORTH SLOPE : ALASKA : ~P/DROLOG : INELASTIC CORRELATION : STOTA. DAT : UP : 200.0 : 18390.0 , Time 05:07:19 OXYGEN SS (ors) BKG SS (ct~) ~LOW IND, SS (cts) 4. 072 +/- .337 4,013 +/- .335 .058 OXYGEN LS (cts) BKG LS (ets) .530 +/- ,122 .197 +/- ,074 FLOW IND. LS (ors) ,333 VELOCITY (ft/min) IX)DR ISS {ct~) ILS (cts) GR (ets) BGR (cts) .000 +/- .000 36.78 2508. 98. 114.4 1957.4 CYCLES SYNCS/CYCLE $ BKG GATES BKGWIDTH us SPACING ft SS LLD L$ LLD 5603 28 16 400.0 1.31 240 240 oXYGeN ACTIVATION ANALYSI.~ ATLAS WIR~.T,INE SERVICES Date Company Name Well Name Field Name County Name State Name Service Name Bkg. File Name Disk File Na_m_e Tool Position Real Time Depth Station Number 01-JAN-80 BP EXPLORATION (ALASKA) INC, }IPF - 4~ . MILNE POINT NORTH SLOP~. ALASKA HYDROLO~ INELASTIC CORRELATION ST03C.DAT UP 201.5 184 05.0 14 spectrum Number : Comment : INJ 6800 BPD Time 02: 14: 16 OXYGEN SS (cfm) BKG SS (ets) FLOW IND. SS (cts) 18.078 +/- .707 4.354 +/- .348 13.724 OXYGEN LS (ets) BKG LS (cts) FLOW IND. L$ (cts) 3,571 +/- .314 ,221 +/- .079 3.350 VELOCITY (ft/rain) LODR ISS (ets) ILS (cts) GR (cts) BSR (cts) 5.429 +/- .433 37.5~ 27~1. 111. 3039.7 1842.6 mmmmmmmmmmmmmmm ,mmmm mm # ¢¥0LE$ SYNCS/CYCLE # BKG ~ATES ~K~ WIDTH us SPA~IN~ ft ~$ LLD LS LLD 5644 ~-8 16 400.0 1.31 240 240 -- OXYGEN ACTIVATION ANALYSI ATLAS WIRELINE SERVICES Coapany Name Well Name Field Name County Name State Name Service N~e Bkg. File Name Disk File Name Tool Position Real Time Station Number : O1-JAN-8 0 : BP EXPIXTRATION (ALAS~) INC. · -HPF - 42 : MILNF. POINT : NORTH SLOP~ : Htq3ROI~G : INELASTIC CORRELATION STOBA, DAT UP 200.0 18400.0 Spectrum Number : 1 Comment : I~J 6800 BPD Time 05:20:02 OXYGEN SS (Ots) BKG SS (cfm) FLOW IND. SS (cts) 5.967 +/- .408 4.384 +/- .350 1,583 HmN~mmm~mmmmm----~m--mmmmm~m~NmmmmmNNNmmmmmmmmmemmmmmmmm~ OXYGEN LS (ors) BKG LS (ets) FLOW IND. LS (ets) · 362 +/- ,101 ,198 +/- .074 .165 ~mm~'~w~mmmmmmm~mmmmmmmmmmmmmmm~m~'mmmmmm~Wmmmmmmmmmmmmmmmm~ .... VELOCITY (ft/~i~) IX)DR ISS (cts) ILS (cts} GR (ets) BGR (cts) .000 +/- .000 35.09 2740. 99. 119.3 1953.5 mmm m m m-m m mm mm m mmmmm m m m m mm mm m mmm~,~ mm mmmm mmmmm m ~mmmm mmmmmmm mm ~ CYCLES SYNCS/CYCLE # BKG OAT~-S BKC WIDTH us SPACING ft SS LLD LS LLD 5604 28 16 400.0 1.31 240 240 Tree: C~--~ero_q 4", 5M Wellh~ I 11" x 11" 5M, FMC w/ :, ',-_ _ 4.5" Tbg. Hnr. w/ NSCT threads top and bottom.and 4" ClW H BPV profile 20" 91.1 ppf, H-40 J 112' -ig. KB Elev. = 41.5' (N 22E) MPU F-42i GLElev.= 12.2' P,T To 'rbg. Spool = 28.2' (N 22E) KOP @ 850' Max. hole angle = 76 to 79 deg. f/ 3,650' to 16,050' Hole angle thru' perfs = 30 deg DLS = 3.4 deg./100' @ 3,500' 9 5/8", 40¢~/ft, L-80 Btrc. ~ 4.5" 12.6 ppf, L-80 NSCT tubing (cap. = 0.0152 bpf, drift = 3.958") 7" 26 ppf, L-80, Mod NSCC prod. csg. ( ddft ID = 6.151", cap. = 0.0383 bpf) Minimum tubing restriction = 3.725" "XN" profile @ 18,033' wlm. Stimulation Summary none performed 7"x 4.5" SABL-3 Baker Pkr. I 18,010' J 4.5" HES 'XN' npl. / / t8,033' (w/3.725" no-go, 3.813" PB) I. J Perforation Summary Ref Ioq: 3~23~97 AWS GPJCCL 4.5" WLEG [ 18,047' J 7" float collar (PBTD) I 18,705' 7" float shoe ! 18,789' DATE REV. BY JBF 02/25/97 04/14/97 MDO Completion Nabors 4 ES COMMENTS Drilled cased Nabors 22E MILNE POINT UNIT WELL F-42i APl NO: 50-029-22741 BP EXPLORATION (AK) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended []Abandoned [] Service Water Injection 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 97-20 13. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22741 4. Location of well at surface r~::::::-' -- .......... ~ 9. Unit or Lease Name 2019' NSL, 2715' WEL, SEC. 6, T13N, R10E i ..... ". . Milne Point Unit ' /,,-w/,~,~,.' 10. Well Number At top of productive interval J rr~'--'~/~'''~ '-'~--- ~ ~I ~it MPF-42i N/A ~ V 'L[-'I~ At total depth ! ._.,~__~__~~ 11. Field and Pool N/A ........... ~,,~_-,;.j Milne Point Unit / Kuparuk River 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Se'r~. ' ;;" Sands RTE = 54'I ADL 355021 12. Date Spudded2/5/97 113' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'115' Water depth' if °ffsh°re 116' N°' °f C°mpleti°ns2/20/97 4/11/97 MSL One 17. Total Depth (MD+TVD) }18. Plug Back Depth (MD+'I-VD)}19. Directional Survey I20. Depth where SSSV set 121. ThickneSs of permafr'~st 18810 7498 FTI 18705 7407 FTI []Yes I--I NoI MDI 22. Type Electric or Other Logs Run GR/CDR/CDN 23. CASING, LINER AND CEMENTING RECORD CASING SE%I-lNG DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.1# H-40 Surface 112' 24" 250 sx Arcticset I (Approx.) 9-5/8" 40# L-80 28.2' 10899' 12-1/4" 2300 sx PF 'E', 935 sx Class 'G' ..... 7" 26# L-80 28.2' 18789' 8-1/2" 230 sx Class 'G' ...... 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 3 3/8" at 6 spf 4.5" L-60 nsct 18047' 18010, MD TVD MD TVD 18425' - 18465' 7163' - 7197' 26. ACID, FRACTURE, CEMENT SQuEEzE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED ,,, 27. PRODUcTIoN TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 4/17/97 I Water Injection Date of Test ~ours Tested PRODUCTION FOR OIL-BBL GAS-MCF iWATER-BBL CHOKE SIZE IGAS-OIL RATIO TEST PERIOD ....... FlOW Tubing Casing Pressure OALCULATED OIL'BBL '~AS-MCF WATER-BBL" O~L GRAVI'TY-API (CORR) Press. 24-Hour RATE 28. CORE DATA ~ ~. ........... Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. None Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. TKUP Not available TKA3 Not available TKA2 Not available TKA1 Not available 31. List of Attachments Summary of Daily Drilling Reports, Surveys ............ 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ChipAIvord ~~/I- (~ -'~'O(.~;¢,.~ Title Senior Drilling Engineer Date ~/~.9(.,07 .... MPF-42i 97-20 Prepared By Name/Number: Kathy Campoamor, 564-5122 Well Number Permit No. / Approval No. ~NSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM ,5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AN[~ 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 2?-' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility Date/Time 05 Feb 97 06 Feb 97 07 Feb 97 08 Feb 97 09 Feb 97 10 Feb 97 11 Feb 97 12 Feb 97 M Pt F Pad 11:00-06:00 06:00-08:30 08:30-16:30 16:30-17:30 17:30-21:00 21:00-21:30 21:30-22:30 22:30-23:30 23:30-06:00 06:00-17:30 17:30-19:00 19:00-19:30 19:30-20:00 20:00-21:00 21:00-04:30 04:30-05:30 05:30-06:00 06:00-22:30 22:30-00:30 00:30-06:00 06:00-06:15 06:15-07:00 07:00-08:30 08:30-09:30 09:30-10:30 10:30-12:30 12:30-15:30 15:30-16:30 16:30-18:00 18:00-19:30 19:30-22:30 22:30-23:30 23:30-00:30 00:30-02:00 02:00-03:00 03:00-05:00 05:00-06:00 06:00-07:00 07:00-01:30 01:30-03:30 03:30-05:30 05:30-06:00 06:00-07:30 07:30-06:00 06:00-06:30 06:30-10:30 10:30-16:30 16:30-18:30 18:30-19:30 19:30-20:30 20:30-21:30 21:30-22:00 22:00-23:00 23:00-01:00 Progress Report Well MPF-42 Rig Nabors 22E Page Date Duration 19hr 2-1/2 hr 8hr lhr 3-1/2 hr 1/2 hr lhr lhr 6-1/2 hr 11-1/2 hr 1-1/2 hr 1/2 hr 1/2 hr lhr 7-1/2 hr lhr 1/2 hr 16-1/2 hr 2hr 5-1/2 hr 1/4 hr 3/4 hr 1-1/2 hr lhr lhr 2hr 3hr lhr 1-1/2 hr 1-1/2 hr 3hr lhr lhr 1-1/2 hr lhr 2hr lhr lhr 18-1/2 hr 2hr 2hr 1/2 hr 1-1/2 hr 22-1/2 hr 1/2 hr 4hr 6hr 2hr lhr lhr lhr 1/2 hr lhr 2hr Activity Rig moved 100.00 % Rigged up Service lines Rigged up Divertor Tested Divertor Made up BHA no. 1 Held safety meeting Made up BHA no. 1 Circulated at 109.00 fi Drilled to 1097.00 ft Drilled to 2817.00 ft (cont...) Circulated at 2817.00 fi Pulled out of hole to 1097.00 ft Serviced Top drive R.I.H. to 2817.00 ft Drilled to 4042.00 ft Circulated at 4042.00 fi Drilled to 4152.00 ft Drilled to 6632.00 ft Circulated at 6632.00 fi Pulled out of hole to 1097.00 ft Pulled out of hole to 1000.00 ft (cont...) Pulled BHA Made up BHA no. 2 Serviced Block line Serviced Top drive R.I.H. to 1097.00 ft Singled in drill pipe to 2236.00 ft Pulled out of hole to 1097.00 ft Pulled BHA Made up BHA no. 3 R.I.H. to 2240.00 ft Circulated at 4000.00 fi Pulled out of hole to 1097.00 ft Pulled BHA Made up BHA no. 4 Singled in drill pipe to 3624.00 ft R.I.H. to 4600.00 ft R.I.H. to 6632.00 ft (cont...) Drilled to 9083.00 ft Circulated at 9083.00 ft Pulled out of hole to 5500.00 ft Serviced Top drive R.I.H. to 9083.00 ft Drilled to 10899.00 ft Drilled to 10914.00 ft (cont...) Circulated at 10914.00 fi Pulled out of hole to 1097.00 fi Pulled BHA Serviced Block line Serviced Top drive Made up BHA no. 5 R.I.H. to 3400.00 ft Reamed to 4500.00 ft R.I.H. to 9325.00 ft 1 27 August 97 Facility Date/Time 13 Feb 97 14 Feb 97 15 Feb 97 16 Feb 97 17 Feb 97 18 Feb 97 M Pt F Pad Progress Report Well MPF-42 Page 2 Rig Nabors 22E Date 27 August 97 01:00-01:30 01:30-05:30 05:30-06:00 06:00-06:30 06:30-08:00 08:00-10:30 10:30-15:30 15:30-18:00 18:00-19:00 19:00-19:15 19:15-06:00 06:00-09:00 09:00-11:30 11:30-12:00 12:00-13:00 13:00-13:45 13:45-15:00 15:00-16:00 16:00-17:00 17:00-17:30 17:30-18:00 18:00-22:00 22:00-01:00 01:00-03:00 03:00-06:00 06:00-07:00 07:00-07:30 07:30-10:00 10:00-11:00 11:00-12:30 12:30-19:00 19:00-20:00 20:00-23:30 23:30-00:30 00:30-01:00 01:00-06:00 06:00-03:00 03:00-06:00 06:00-06:30 06:30-09:00 09:00-11:00 11:00-12:30 12:30-14:00 14:00-15:00 15:00-16:00 16:00-03:00 03:00-03:30 03:30-06:00 06:00-12:30 12:30-14:00 14:00-16:30 16:30-17:30 17:30-20:00 20:00-06:00 Duration 1/2 hr 4hr 1/2 hr 1/2 hr 1-1/2 hr 2-1/2 hr 5hr 2-1/2 hr lhr 1/4 hr 10-3/4 hr 3hr 2-1/2 hr 1/2 hr lhr 3/4 hr 1-1/4 hr lhr lhr 1/2 hr 1/2 hr 4hr 3hr 2hr 3hr lhr 1/2hr 2-1/2 hr lhr 1-1/2 hr 6-1/2 hr lhr 3-1/2 hr lhr 1/2 hr 5hr 21hr 3hr 1/2 hr 2-1/2 hr 2hr 1-1/2 hr 1-1/2 hr lhr lhr llhr 1/2 hr 2-1/2 hr 6-1/2 hr 1-1/2 hr 2-1/2 hr lhr 2-1/2 hr 10hr Activity Opened hole to 10914.00 ft (12-1/4in) Circulated at 10914.00 ft Pulled out of hole to 10000.00 ft Pulled out of hole to 9939.00 ft (cont...) R.I.H. to 10914.00 ft Circulated at 10914.00 ft Pulled out of hole to 1097.00 ft Pulled BHA Rigged up Casing handling equipment Held safety meeting Ran Casing to 9-5/8in (9055.00 ft OD) Ran Casing to 10898.00 ft (9-5/8in OD) (cont...) Circulated at 10898.00 ft Pumped Water based mud spacers - volume 90.000 bbl Mixed and pumped slurry - 541.000 bbl Mixed and pumped slurry - 191.000 bbl Displaced slurry - 820.000 bbl Circulated at 1310.00 ft Mixed and pumped slurry - 348.000 bbl Displaced slurry - 99.000 bbl Cleared Flowline Removed Divertor Installed Casing spool Rigged up BOP stack Tested BOP stack Tested BOP stack (cont...) Installed Wear bushing Made up BHA no. 6 Singled in drill pipe to 1309.00 ft Drilled installed equipment - DV collar Singled in drill pipe to 10720.00 ft Tested Casing - Via annulus and string Drilled cement to 10934.00 ft Circulated at 10934.00 ft Performed formation integrity test Drilled to 11245.00 ft Drilled to 13921.00 ft (cont...) Pulled out of hole to 13133.00 ft Worked toolstring at 13302.00 ft Circulated at 13302.00 ft Pulled out of hole to 10850.00 ft Serviced Top drive Serviced Block line R.I.H. to 13363.00 ft Reamed to 13921.00 ft Drilled to 15160.00 ft Circulated at 15160.00 ft Drilled to 15446.00 ft Drilled to 16211.00 ft (cont...) Circulated at 16211.00 ft Pulled out of hole to 10850.00 ft Serviced Top drive R.I.H. to 16211.00 ft Drilled to 17071.00 ft Facility Date/Time 19 Feb 97 20 Feb 97 21 Feb 97 22 Feb 97 23 Feb 97 24 Feb 97 25 Feb 97 M Pt F Pad Progress Report Well MPF-42 Rig Nabors 22E Page Date Duration Activity 06:00-00:00 00:00-02:00 02:00-03:30 03:30-04:30 04:30-06:00 06:00-08:00 08:00-13:30 13:30-14:00 14:00-14:30 14:30-15:45 15:45-19:00 19:00-02:00 02:00-04:30 04:30-05:00 05:00-06:00 06:00-09:30 09:30-10:30 10:30-11:30 11:30-16:00 16:00-17:00 17:00-21:00 21:00-22:00 22:00-05:30 05:30-06:00 06:00-09:00 09:00-09:30 09:30-10:30 10:30-12:00 12:00-01:00 01:00-04:00 04:00-06:00 06:00-16:00 16:00-17:30 17:30-18:15 18:15-20:00 20:00-20:30 20:30-21:30 21:30-00:00 00:00-01:00 01:00-03:00 03:00-05:45 05:45-06:00 06:00-06:30 06:30-07:00 07:00-08:00 08:00-09:00 09:00-00:00 00:00-01:00 18hr 2hr 1-1/2 hr lhr 1-1/2 hr 2hr 5-1/2 hr 1/2hr 1/2hr 1-1/4 hr 3-1/4 hr 7hr 2-1/2 hr 1/2 hr lhr 3-1/2 hr lhr lhr 4-1/2 hr lhr 4hr lhr 7-1/2 hr 1/2 hr 3hr 1/2 hr lhr 1-1/2 hr 13hr 3hr 2hr 10hr 1-1/2 hr 3/4 hr 1-3/4 hr 1/2hr lhr 2-1/2 hr lhr 2hr 2-3/4 hr 1/4 hr 1/2hr 1/2hr lhr lhr 15hr lhr Drilled to 18121.00 ft (cont...) Circulated at 18121.00 ft Pulled out of hole to 15990.00 ft Serviced Drillfloor / Derrick R.I.H. to 18121.00 ft Drilled to 18312.00 ft Circulated at 18312.00 ft Pulled out of hole to 17362.00 ft R.I.H. to 18312.00 ft Drilled to 18374.00 ft Circulated at 18374.00 ft Drilled to 18810.00 ft Circulated at 18810.00 ft Flow check Pulled out of hole to 17385.00 ft Pulled out of hole to 10850.00 ft (cont...) Serviced Block line Serviced Drillfloor / Derrick R.I.H. to 18312.00 ft Reamed to 18810.00 ft Circulated at 18810.00 ft Dropped EMMS survey barrel Pulled out of hole to 500.00 ft Pulled BHA Pulled BHA (cont...) Removed Wear bushing Worked on BOP - Top ram Rigged up Casing handling equipment Ran Casing to 10850.00 ft (7in OD) Circulated at 10850.00 ft Ran Casing to 7in (12200.00 ft OD) Ran Casing to 18789.00 ft (7in OD) (cont...) Circulated at 18789.00 ft Mixed and pumped slurry - 47.000 bbl Displaced slurry - 715.000 bbl Tested Casing Rigged down Casing handling equipment Installed Seal assembly Worked on BOP - Top ram Rigged down BOP stack Rigged up Xmas tree Tested Xmas tree Rigged down Hanger plug Installed Hanger plug Freeze protect well - 65.000 bbl of Diesel Rigged up Drillstring handling equipment Laid out 5in drill pipe from derrick Serviced Block line 3 27 August 97 NRBORS ...L. ~59-4561 RFK_~ 'U¢ z'bi ~o.UUZ ~.Ui/Ui "'"7 SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: MPF-42i Rig Name: N-4ES AFE# 347060 Accept Date: 04/07/97 Spud Date: - Release Date: 04/11/97 April 8, 1997 MIRU. Rig accepted 04/07/97 @ 2030 hrs. Spot rig, RU berm, raise derrick. RU TT, check annuli static, ND frac tree. NU BOP, ND 2-7/8" rams, MU 3-1/2" rams, pull BPV & false bowl. Set test plug, test BOP (C. Scheve w/AOGCC on location). April 9, 1997 RU test BOP, AOGCC witness, annul leak. Change annul insert. Retest annul, ok. Install WR. Rig floor, MU RBP tool, TIH w/3-1/2" DP. Circ diesel to frac tank. Cont RIH w/DP to 12527'. Load DP in pipe shed, slop drlg line. Cont RIH t/14182'. Rev out methonal, DP u-tube, monitor well static. Cont FIIH t/15404'. CBU. RIH t/15550', sting into RBP, set down 5K, monitor well, PU release BP. CBU @ 15559'. April 10, 1997 CBU. Cont RIH t/18314'. CBU, monitor well. Slight flow, shut in & monitor well. Cont circ, raise MW, monitor well. No flow. TOH, LD DP. Slip, cut drlg line. Cont POOH, LD DP, LD retrieve tool & RBP. Pull WR, set test plug, ND 3-1/2" rams, NU 4-1/2" rams. Test 4-1/2" rams per SSD. Load & SLM 4-1/2" tubing in pipe shed. April 11, 1997 Load pipe shed w/tubing. SLM drift. RIH with tubing/Baker Packer. Load pipe shed w/tubing, SLM drift. RIH w/tubing & w/Baker Packer. Page ! NIA N/A N/A N/A N/A :urn: N/A -N/A N/A N/A 4-B-97 4,~..~7 N ~ N/& N/A N/A N/A N/A N/A NIA ....... NIA N/A' 'NIk N/A N/A . N/A- N/A N/A NIA ' . ...... -NIA NIA NIA N/A ,m NIA GO-aA N/A N/A N/A N/A N/A BPX 0 ~. o I~ke 4-'~-g? : 8,31-g7 4-g-~7 N N/A N/A N/A NIA Employer, N/A Filed? (Y/N) N/A OlmmUor~ From ~ ta ~ NRBSRS .... ID:659-zi561 -- RPR 10'97 5:~! No.OO/ P.O~/03 r'ruurlo~ ~' ii~ncj _ , q,/l~UUl u ¥¥ui r~Jv~l r't~UUI I. [AFE No: 3. ~ Re~d No: 3 Date: 4/10/~ ~ .,tl~n Day~et 3 8upv Init: d WaX: TD: ' ' ' PBD: ' MPU F-42i 18.789 18,70~ ~T~ of Fill: Conlre~or: NABORS 4ES JPhone: '~154ICos~:~DaiIy $22,734 IWOl~mm~P~sts: $87,60'9 I~ ~0 " .Well Co~t~ . J lnter~dlme (Pm~u~n) Crag: 7,,, 26~ L-80 ~ 10,70~ Operation at 0800: LOAD PIPE SHED W/4.5 ~G I~e/Deolh Prod~lon Unoc ~A lPedoratod Intel: 18,425-18,465 Sudace Csg. psi: ' ~A J~st Cag T~at: N/A Si~eoth . 191~e~enth Rig A~epl (hffdate): ~30-HRS-4-7-97 Rig Relate (hr/date); N/A ' Pump No. lU~er'Size:5Xl0 SPM: N/~ GPM: N/A p~l: N/A Slow Pump Rate; N/A Slow Pump psl: N/A ~ No. 2 Uner SEe: N/A 8PM:. ~/A GPM: ~A ~sl: N/A Slow P~p Rate: N/A Slow Pump psi: N/A F~Id erln'e lover N/A Dai,y ''N/A / To~ N/A· lDa,y S0 FlUldD~ Welght:T~e: 9.1 jVis; Ibalance: Loss: DBU Loss; Cost: ~lorides: ~% WtE 2e jPV~P: N/A N/A N/A N/A ~BHA Desmi~n: .... .... ISerial ~et~: lDepih In: N/A BE& BENum: N/A Size: N/A Make: N/A lType: N/A IN~ N/A ....... Mill Depth Fig: H N/A IRe[': ~A RP~: N/~ Wt' N/A ~ndi[i°n' Bil& BIINUm:N,A Size: N/A Make: N/A ~ype: N/A I~:rial: N/A ~et~FA:' . . . :.' Mi, 66P~ Ftg; Out: N/A . .N/A N/A IReP: N/A IRPM'' N/A IWI: N/A J~ndltlon:. N/A Inie~io~ pate ., Source: Volume: T~o Fluid; InJeotlOnwe,: CC-2A Rate: N/A g pal l~mmulallve . , , Daily V6~me: N/A ~1 Volume: N/A Freeze Pmte~ Huid: N/A ~- Volume: N/A ..... ~al ...... , . . Fugl ~ Water Dale Used: g~ Soume: ... : gallUsed: _ ~lSoume: . Lake Guttin,, Da,~ II Weather Da~ Speed; Chill Famon .3 'F Daily: N/A C N/A O~ 8its: N/A 'g 8 ~ . ., Last BOPE Test: 4-8-97 LasteOPDfil~ 4-10-97 ~t-H2SDri,: 4-9-97 Last Spill DfiU; 4-10-97 Spill (Y/N)? N Volume (~&~s.): N/A JTyp~ Spill: N/A~ Re~, Flied? N~A .. ..... Time Operation Pr;b'~ 'Hrs. ' .... Operations From 0800 Io 0800 ... NO SPILLD NO AOOIDE~S -612 DSLTA "~ DSLS ' ' 0~0, KI'L[ .~ OIRO B~M UP W/8.9 BRINE ...... ' 0~0~ KILL 2.5 CONT RIH TO 18,314 .... 090~ KiLL 3 CBU W/8.g BRi~E,MON WELL'SM FLOW, SHUT IN.ON WE~ ~20~1e~ K~LL " 4 ~T CiRO,RAISE MW TO 9.1,MON WE~"O" PRESS.Nd FLOW , ..... 1~00-02~ PL PKR 10 ~OH ~ 3,5 DP . ,. 02~-0300 RIG SERV 1 SLIP C~ DRL UNE ..... ~-~0 PL PKR 1.5 CONT POH,LD 3.D DP, LD R~R TOOL & RBP , , ~D0600 NUND .5 PUL~ WEAR RING,S~ TEST PLUG,ND 3.5 RAMS,NU 4.5 RAMS = 05~-o530 TEST .5 TEST 4.5 ~MS PEH SSD . 0530-0600 RUN~P .5 LOAD & S~ 4.S TBG IN PIPE SHED =.. ..... . . , . .. ..... ~ ..... NR]30RS ~'~:659-4561 RPF--."9'97 5:57 No.00& P.01/05 r'rugnoe ~ay ur I _~ /Oompletio ¢orkover Rt 3orr -AFE Ne; 347060 ' BelfOrt No: 2 .Oate; 4/9/97 Oompl~tion D ~St: ~ 8upv Init: d N~ ' I"U: P"6~ 'J TOp of FIll: "' Well: MPU F 42i 1878g 18705 Contractor: NABOR8 4Ed IPhOne: 4154 ~Da¢l~ ' - $22,748 I~m~p $64,776 !~ WO C~¢ts: S0 Well Co~l; , ~ Inle~odiate (Profusion) Operati°~ at 06~: CIRO B~M UP ISiz~Deoth 7", 26¢ L-B0 ~18789 Production Liner: ~A ~ Pedorated Inter. 18~5-18,4~. Sud~e O~. ~i: N/A [L~t Osg Te~: "~/A ~l~a~ I~l~/De~th Rl~ A~pi (hddato): 2030 HRS 4'7-97' Rig Relate (hddete); N/A ' ' Pump No. I Ll'~r Size: 5 X 10 SPM: .N/A GP~: N/A psi: N/A 81~ Pump Rate: N/A ~low Pump ~i: ~a NO. 2 Liner'Size: N/A SPM: N~A GPM: N/A psi: ~' Sl~ Pump Rate: N/A-" Slow Pump psi: · N/A ~,u,~ ~..o - o~ .,~ ~""~ ..... ~" ..,I ~o.., .~ I~-,,~ .o I~o~,: Fluid T~e: b~Ionco: Loss: Loss: I Cost; , ..,... .. Bil & 8i[ Num: N/A SIze: N/A Make: N/A ' IType: ~& ISabel' N/A p~ts~FA: '" [Depth In: I .... I ~: / ...... ,:. i 0U~: N/A N/A Wt: N/A Cond~ion: N/A . . . . . , = Mill Depth Ftg: ~'ra: .... ' ....... ,,,: "'* "'* '"'*'1"°"' "'* I"""' "'*__. Iw': "'* 1 . · - . l~i~qtion P~ta ... ' I ~Pro..uro: N/A Souroe: Volumo: T~ Fluid: inJeoUon CC-~ Rate: N/A gp ....... Well: ' p~l Ibum~ulatlve Daily' Volumo: N/A ~! Volume: _. N/A ' - - ' Freezo Proto~ Fluid: N/A . ....... . Volume; N/A- Fuel ~ Wster ~_ ¢.~ ]~u., [~, ;11~". water ' IOd. Water. Used: g~ I SourCe: BPX- ' IReeVd: 0 g=~ ~.~: ...... ~lSource: e 8~ed: 9 D'Iy: NIA C umulatlV':, N/A O~St°rage N/A I P: -~ .F Site: . . . . ' '~., ~.,,, ~.,,: 4-.-..'1~.,,'<wN~* ' ' N-' ~'''lw'am"' ~",~.~: N/~'F,." ~."': N~'"~" ~"'~ .... I., N/A A~ident? (Y/N) N IN"m": N/A : IEmp~oY"r: N/A t apt Filed7 (Y~) N/A Time ~e~ti'~ Prob Code [ Hrs.- ' Operations From ~00 to NO SPILLS NO ACGIDENTS *'611 DSLTA *'73 'D~LS"' 0600-0~ NU ND ' '.3 RIG UP TEST BOP,AOGCC' WItNESS,ANNUL L~K ..= . . , ,.. · . . 0~00-1130 EFC 2.S CHG-ANNUL INSERT - 1130-12~ --EFC ' 1: ' RETEST ~NUL OK, INST WEAR RING ........ 123~1~ KILL 2.5 RIG FLR,MU.RBP T~L,TIH W/~.5 DP 1500-1~0 ~ CIRC ' - .5 ClRC DIESELTo FRAC TNK,.~ 2000',W/8.9 BRINE 1~a0-2~0 KILL 7.5 ~NT RIH W/3.5 DP TO 12,527 ~ -" -23~-2330 K~LL .5 LOAD 200 JTS.DP IN PIPE SHED,SLIP DRL LINE "' 23~-0030 KILL 1' GONT RIH TO 14182 -0030-0100 CIRC .5 REV OUT 4 BBLS METHANOL,DP U TUB~MONT WELL STATIC 0100-0~0 KiLL 1.5 CONT RIH TO 15,~4' 023~-~0 " ClRC 2 CIRC B~M UPi5 BPM,1700~,8.6 & METHANOL TO ~ 0430-0500 ' 'Ki~ ' -- .5 RIH TO 15,S50',STING INTO RBP,SET DWN 5K,MONT WELL,PU RELEASE BP 05~0600 CIRC I CIRC B~M UP ~ 15,5~9',5 BPM ~ 1900~/W/CLN 8.9 BRINE ..... ..... ~ .., . . ~ ~ , NABORS J:659-456.1 lip 8'97 5:55 No .001 P.O1/OI t ISupv Init:- - PrudhO~AFE No: 347060BAY ~, ~dlinC~Rep-°r~ NO: ~ ~ Date: 4/8t07 Comploti°n DAy- ZAt:" - S . J N~ Well: MPU F421 ~: 1 8789 PBD; I a705 ~Top al Fill: 1 8705 ~;~ntra~or: NABORS 4ES [Phono; 4154. ~Oaily $~2.041 i~ ~ ~42 041 J ~mm ' ' ICosf~: IWO Cost~; ~ ' -! W~ll~;n~t~ Oper~tio~ at 0600: TEST BOP [intermediate (Proauction) Csg: ~i~e/~pth ~', 26~ L-80 ~ 18789 ~rodu~ion Ltne~: N/A ' ~ Pedormte~ Intel: 18425-18,465 sUdace C~. psi: N/A ~La~ ~ Test: 4-7-~7/7"/1 Rig A~pt (hr/d~t~): 2030 HRS 4-7-97 Rig Rel~o (hr/da~e): N/A Pump No. I Uner Size: 5 x 10 SPM: N/A GPM: N/A- psi: N/A ' SI~ Pump Rate: N/A ' ~low Pump psi; N/A ,, ~ No. 2 Uner S~e: N/A S~: N/A .GPM: N/A psi: N/A Slow Pump Rat~: NIA Slow Pump psi: N/A Fluid-- Brine .,.. .,.d I°'"' .,o , Fluid Typ~: balance; Loss; BB Lo~: Cost: Co~l; iv,.= i.v,,= ,(.. .,. ~amp~,,,.: N~ lE'~' <aBM,=, ,,A 1%Wi" .lA BHA Description: .,, .- - j , , , , . Blt Num= N/A Size= NIA Make: NIA ~ypo: 'NiA' J Se,~- NIA ~.Is~FA=_ . J~pth In: N/A ~it & ' - No: . ' ' ' ' I . Out: -N/A N/A . N/A '-N/A -- . N/A' . N/A~ N/A · ~ . .. .., Injection pate - -' J PreSsure: 'N/A Source: -Volume: TyP~ Fluid: . In]e~lOnwell:. cC.2A. Rate: . N/A g .... JCu~mulativo .- '" Daily Value:" N/A ~J Vo[u~: N/A ' ,, , .- -- Freoze Prote~"Fiuld: N/A . Volumo: N/A gal .... - Fu &WaterData ' - . ,, ~ ~ sos J ~' a.x' ": I~-'~? ".' !~'- W~er ~00 !~". W~ Used: , '~~ Source: JRegv'd: 3040 galJUsed: ~jSouLce: L~ke b~ly: NlA' C~umulativ°: Pat~ Woa~erDam.. .., ~it~; , . ~nfntv/~ ~n~ ' ' ' L"t BOPE Ts.: 4.8_97 ILaJt'~OP Drill: .4.4.97 l~t H28 Drill: 8-~1-97 I~t Fire Drill:' 4'4-97 - ~st Spill brlil: . 4-6-97jspi, N , . N~A JTvp- .... N(~J (Y/N)? ' ' IVoiume (~a,,.): spi,,: .... ,=,ua-t? (Y/,? N I""m": - ... N/A ' I~mP'oY?", N/A -JR,, F,,od, (Y/N~.. ~f~_ . ~ ~ Operntion. Prob Code - Hrs. - ' "' Operations From 0600 to 06~ .......... ..... NO" S~i~S- NO ACOIDENTS '"DSLTA 6~0 *' 72 DSLS . ' -' - '~' ""--RIG ON STDBY F/12~ HRS'4-6-g7 .TO 2030'HRS ~7-97 (~2.5 H~') - . ..~ .... ~-~4oo .~nu n.s NaVE ~N.SPOT RtG/RU BER~,~SE ~RK · 460~230 NU ND - " 2.5 RU ~,OK ANNULI STAT'I'~,~D FRAC.TREE ..... 0230-06Q0 NU ND ' - 3;5 N0 ~6~,ND'2 7/8. ~MS,NU 8.5 ~MS',P.ULL BPV & FALSE BOWL, ..' ' .... SET TEST PLUG,TEST BOP,(0. SHEVE,AOGOO ON LOOATION) '. ..... ..... . .- %, .... m il .1 _ · ....... . ... .. i i., -. J I i i i .. . -. i ...... ..... , .. . ~ . , l. i i I i. i I II ........ Schlumberger ANADRILL Survey Report Client: BP Field: Milne Point Well Name: MPF-42i API#: 50-029-22741-00 Job#: 39387 Permanent datum GROUND LEVEL Depth measured from Kelly Bushing Elevation of kelly bushing Elevation of drill floor Elevation of ground level Magnetic Declination 28.09 DEG Grid Convergence 0.00 DEG Total Correction 28.09 DEG TIE IN POINT Measured depth True vertical depth N/S disp (-ye for S) E/W disp (-ye for W) 0.00 FT 0.00 FT 0.00 FT 0.00 FT 21-FEB-97 01:56:18 41.50 FT 41.50 FT 12.20 FT Page 001 Inclination O. 00 DE Azimuth 0.00 DEG Azimuth from rotary table to the target 332.60 DEG Minimum Curvature Method MEASURED INTERVAL VERTICAL TARGET DEPTH DEPTH SECTION FT FT FT FT 0.0 0.00 0.00 0.00 112.0 112.00 112.00 0.00 203.1 91.10 203.10 -0.11 294.2 91.10 294.20 0.23 385.1 90.90 385.08 1.97 476.0 90.90 475.91 5.45 566.2 90.20 565.96 10.63 657.4 91.20 656.85 18.07 748.3 90.90 747.17 28.30 836.4 88.10 834.42 40.52 928.2 91.80 924.91 55.90 1020.8 92.60 1015.42 75.37 1115.9 95.10 1107.32 99.61 1211.2 95.30 1198.59 126.85 1307.6 96.40 1290.18 156.74 1402.6 95.00 1379.10 190.10 1498.5 95.90 1467.88 226.34 1594.7 96.20 1556.11 264.67 1688.7 94.00 1640.77 305.49 1783.9 95.20 1725.07 349.73 1881.0 97.10 1810.00 396.79 1977.1 96.10 1892.75 445.63 2071.7 94.60 1971.98 497.29 2166.8 95.10 2049.09 552.94 2261.9 95.10 2123.69 611.91 2356.9 95.00 2195.66 673.89 2452.0 95.10 2264.75 739.22 2547.7 95.70 2331.04 808.21 2643.1 95.40 2393.87 879.99 2739.3 96.20 2453.76 955.26 2833.6 94.30 2509.23 1031.51 STATION INCLN. DEG 0.00 0.00 0.14 0.58 1.64 2.76 3.85 5.52 7.41 8.54 10.76 13.66 16.13 17.30 19.02 22.18 22.25 24.72 26.76 28.62 29.36 31.75 34.47 37.17 39.49 41.99 44.82 47.47 50.14 52.85 55.08 AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS N/-S E/-W CEMENT DEG FT FT FT DEG D/HF 0.0 0.00 0.00 0.00 0.00 0.00 0.0 0.00 0.00 0.00 0.00 0.00 141.2 -0.09 0.07 0.11 141.20 0.15 320.2 0.18 -0.16 0.24 319.27 0.79 325.5 1.61 -1.19 2.00 323.54 1.17 328.2 4.54 -3.08 5.48 325.86 1.24 329.6 9.00 -5.75 10.68 327.40 1.21 328.9 15.39 -9.57 18.13 328.13 1.83 332.2 24.32 -14.56 28.35 329.09 2.12 333.1 35.18 -20.17 40.55 330.17 1.29 331.1 48.76 -27.40 55.93 330.67 2.45 341.0 66.68 -35.14 75.37 332.21 3.85 338.9 89.62 -43.55 99.64 334.08 2.66 339.1 115.21 -53.37 126.97 335.14 1.23 337.4 143.11 -64.52 156.98 335.73 1.87 334.8 173.63 -78.11 190.39 335.78 3.46 333.6 206.27 -93.89 226.64 335.53 0.48 333.0 240.51 -111.12 264.94 335.20 2.58 333.1 276.90 -129.62 305.74 334.92 2.17 332.7 316.28 -149.78 349.95 334.66 1.96 332.1 357.98 -171.58 396.98 334.39 0.82 331.6 401.05 -194.64 445.79 334.11 2.50 331.8 446.55 -219.13 497.42 333.86 2.88 332.4 495.73 -245.16 553.04 333.69 2.86 333.9 548.36 -271.78 612.01 333.64 2.63 333.8 604.01 -299.10 674.01 333.66 2.63 333.8 662.63 -327.95 739.35 333.67 2.98 333.2 724.38 -358.75 808.35 333.65 2.81 333.1 788.42 -391.17 880.13 333.61 2.80 332.5 855.37 -425.58 955.39 333.55 2.86 333.3 923.25 -460.31 1031.64 333.50 2.46 Page 1 Schlumberger ANADRILL Survey Report 21-FEB-97 01:56:18 Page 002 Minimum Curvature Method MEASURED INTERVAL VERTICAL TARGET STATION AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS DEPTH DEPTH SECTION INCLN, N/-S E/-W CEMENT FT FT FT FT DEG DEG FT FT FT DEG D/HF 2931.5 97.90 2563,42 1113,03 57,69 333,2 996.05 -497,00 1113.16 333,48 2.67 3026.3 94,80 2612,08 1194.38 60,54 332.9 1068,56 -533.88 1194,51 333.45 3.02 3121,5 95,20 2656,83 1278.38 63.38 333,7 1143,62 -571.62 1278,52 333.44 3.07 3217,3 95,80 2699,49 1364,14 63,73 333,9 1220,59 -609,49 1364,30 333,47 0.41 3313,1 95,80 2740,11 1450,88 66,10 333,4 1298,33 -648,00 1451,05 333.48 2,52 3407,3 94,20 2776,10 1537,91 68,97 334,0 1376,36 -686,56 1538,10 333,49 3.10 3503.4 96,10 2808,09 1628,50 72,14 333,1 1457,48 -726,92 1628,70 333.49 3,41 3599.0 95,60 2835,33 1720,13 74,74 333,2 1539,23 -768,31 1720,33 333.47 2,72 3690,3 91,30 2858,07 1808,54 76,42 331,1 1617,40 -809,62 1808,72 333,41 2,89 3788,4 98,10 2880,99 1903,90 76,56 331,8 1701,19 -855,20 1904,05 333,31 0.71 3884,1 95,70 2902,83 1997,07 77,05 331,8 1783,30 -899,23 1997,19 333,24 0.51 3980,4 96,30 2923,92 2091,02 77,65 331,4 1865,95 -943,92 2091,12 333,17 0,74 4075,8 95,40 2943,95 2184,27 78,11 331,7 1947,96 -988,36 2184,36 333,10 0.57 4167,8 92,00 2962,54 2274,36 78,58 331,4 2027,18 -1031,28 2274,43 333,04 0,60 4265,4 97,60 2981,91 2369,98 78,53 330,5 2110,81 -1077,73 2370,02 332.95 0.91 4361,3 95,90 3000,46 2464,00 79,16 330,3 2192,62 -1124,21 2464,02 332,85 0,69 4453,7 92,40 3019,24 2554,42 77,38 331,5 2271,66 -1168,20 2554,44 332,79 2,31 4552,2 98,50 3040,96 2650,49 77,15 332,3 2356,41 -1213,46 2650,50 332,75 0.83 4650.0 97,80 3062,68 2745,84 77,18 331,8 2440,65 -1258,15 2745,85 332.73 0,50 4743,3 93,30 3083,42 2836,80 77,13 331,6 2520,74 -1301,28 2836,80 332.70 0.22 4840,0 96,70 3105,04 2931,04 77,04 331,8 2603,73 -1345,96 2931,04 332,66 0.22 4934.8 94.80 3125,85 3023.51 77.60 331,4 2685,08 -1389.95 3023,51 332,63 0.72 5029,2 94,40 3146,58 3115,60 77,03 332,4 2766,32 -1433,33 3115,60 332.61 1,20 5124,4 95,20 3167,53 3208,46 77,54 332,6 2848,69 -1476,21 3208,46 332,61 0.57 5220.3 95,90 3189,06 3301.91 76,51 332.6 2931,66 -1519,21 3301,91 332.61 1,07 5316.3 96,00 3211,47 3395,26 76,50 333,1 3014,72 -1561,81 3395,26 332,61 0,51 5412,8 96,50 3233,84 3489,13 76,69 333,3 3098,51 -1604,14 3489,13 332,63 0.28 5509.0 96,20 3257,25 3582,43 75,14 332,5 3181,57 -1646,64 3582,43 332,64 1.80 5603,5 94,50 3281,63 3673,73 74,95 332,3 3262.48 -1688,94 3673,73 332,63 0.29 5699,3 95,80 3306,04 3766,37 75,53 332,8 3344,69 -1731,64 3766,37 332,63 0.79 5795,4 96,10 3330,02 3859,43 75,57 332,7 3427,42 -1774,25 3859,43 332,63 0,11 5889,9 94,50 3353,57 3950,95 75,57 332,5 3508,67 -1816,37 3950,95 332,63 0,20 5987.5 97.,60 3377,98 4045,44 75,46 331,9 3592,26 -1860,44 4045.44 332,62 0.61 6082.4 94,90 3401,42 4137,39 75,94 331,5 3673.23 -1904,04 4137.39 332,60 0.65 6178,1 95,70 3424,79 4230,18 75,80 332,1 3755,02 -1947,89 4230,18 332,58 0,63 6273,3 95,20 3447,33 4322,67 76,81 331,6 3836,57 -1991,53 4322,67 332,57 1,18 6368,9 95,60 3468,81 4415,81 77,21 332,2 3918,74 -2035,40 4415,82 332,55 0,74 6464,9 96,00 3489,47 4509,56 77,94 332,7 4001,86 -2078,76 4509,57 332,55 0.91 6560.9 96,00 3509,95 4603,35 77,42 333,4 4085,47 -2121,27 4603,35 332,56 0,89 6621,1 60,20 3522,89 4662,13 77,77 330,6 4137,37 -2148,87 4662,14 332,55 4.58 6715.7 94.60 3543.01 4754.56 77.68 333.6 4219.06 -2192.12 4754.56 332.54 3.10 6810.6 94.90 3563.38 4847.24 77.53 332.5 4301.68 -2234.13 4847.24 332.55 1.14 6906.8 96.20 3584.07 4941.18 77.63 333.9 4385.53 -2276.49 4941.18 332.57 1.43 7002.1 95.30 3604.56 5034.24 77.53 333.1 4468.82 -2318.01 5034.24 332.58 0.83 7096.7 94.60 3624.87 5126.63 77.68 333.1 4551.22 -2359.81 5126.63 332.59 0.16 Page 2 Schlumberger ANADRILL Survey Report 21-FEB-97 01:56:18 Page 003 Minimum Curvature Method MEASURED INTERVAL VERTICAL TARGET STATION DEPTH DEPTH SECTION INCLN. FT FT FT FT DEG 7191.8 95.10 3645.28 5219.51 77.54 7289.6 97.80 3666.36 5315.01 77.56 7383.3 93.70 3687.60 5406,27 76.24 7479.0 95.70 3710.69 '5499.14 75.83 7572.5 93.50 3733.30 5589.86 76.18 AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS N/-S E/-W CEMENT DEG FT FT FT DEG D/HF 332.3 4633.76 -2402.42 5219.51 332.60 0.83 331.9 4718.16 -2447.10 5315.01 332.59 0.40 332.7 4798.96 -2489.53 5406.27 332.58 1.64 332.3 4881.34 -2532.41 5499.14 332.58 0.59 332.6 4961.77 -2574.37 5589.86 332.58 0.49 7669.2 96.70 3757.29 5683.54 75.10 7765.1 95.90 3782.36 5776.10 74.59 7860.0 94.90 3807.22 5867.66 75.04 7955.3 95.30 3831.79 5959.69 75.07 8050.0 94.70 3857.68 6050.75 73.20 332.8 5045.02 -2617.34 5683.54 332.58 1.13 333.5 5127.60 -2659.14 5776.10 332.59 0.88 334.4 5209.88 -2699.36 5867.66 332.61 1.03 334.4 5292.92 -2739.15 5959.69 332.64 0.03 333.9 5374.89 -2778.86 6050.75 332.66 2.04 8145.2 95.20 3885.44 6141.77 72.89 8240.6 95.40 3912.99 6233.06 73.55 8336.6 96.00 3939.04 6325.42 74.95 8433.4 96.80 3963.09 6419.17 76.28 8527.9 94.50 3985.47 6510.95 76.32 334.7 5456.95 -2818.35 6141.77 332.69 0.87 334.2 5539.35 -2857.75 6233.07 332.71 0.85 333.6 5622.32 -2898.40 6325.44 332.73 1.58 333.7 5706.34 -2940.01 6419.19 332.74 1.38 334,5 5788.93 -2980.12 6510.98 332.76 0.82 8624.3 96.40 4007.32 6604.78 77.48 8720.3 96.00 4027.68 6698.54 78.03 8815.8 95.50 4047.65 6791.90 77.83 8911.8 96.00 4068.25 6885.65 77.39 9001.0 89.20 4087.72 6972.70 77.39 334.7 5873.75 -3020.39 6604.82 332.79 1.22 334.5 5958.49 -3060.63 6698.59 332.81 0.61 333.7 6042.50 -3101.42 6791.95 332.83 0.85 333.1 6126.34 -3143.40 6885.71 332.84 0.76 332.7 6203.83 -3183.06 6972.76 332.84 0.44 9103.3 102.30 4110.75 7072.37 76.60 9195.6 92.30 4132.68 7162.02 75.90 9293.2 97.60 4155.74 7256.84 76.77 9389.6 96.40 4177.44 7350.74 77.21 9484.6 95.00 4198.93 7443.27 76.65 331.9 6292.08 -3229.39 7072.43 332.83 1.08 331.8 6371.13 -3271.69 7162.07 332.82 0.77 331.3 6454.52 -3316.87 7256.89 332.80 1.02 331.4 6536.94 -3361.90 7350.78 332.78 0.47 332.2 6618.49 -3405.63 7443.30 332.77 1.01 9578.8 94.20 4220.25 7535.02 77.19 9673.9 95.10 4241.95 7627.59 76.42 9771.3 97.40 4264.46 7722.34 76.86 9867.2 95,90 4286.72 7815.61 76.30 9962.7 95.50 4308.85 7908.49 76.90 331.4 6699.36 -3448.99 7535.05 332.76 1.01 331.6 6780.73 -3493.17 7627.61 332.74 0.84 332.0 6864.24 -3537.95 7722.36 332.73 0.60 331.5 6946.41 -3582.10 7815.63 332.72 0.77 331.1 7027.90 -3626.71 7908.50 332.70 0.75 10058.2 95.50 4331.03 8001.35 76.24 10154.0 95.80 4353.14 8094.54 77.07 10248.8 94.80 4374.78 8186.80 76.54 10344.0 95.20 4396.23 8279.54 77.42 10440.3 96.30 4417.68 8373.41 76.84 331.6 7109.41 -3671.25 8001.36 332.69 0.86 330.7 7191.06 -3716.23 8094.54 332.67 1.26 331.7 7271.93 -3760.69 8186.81 332.65 1.17 331.8 7353.64 -3804.59 8279.55 332.64 0.93 331.6 7436.30 -3849.10 8373.42 332.63 0.64 10535.9 95.60 4438.95 8466.60 77.45 10630.5 94.60 4459.84 8558.84 77.03 10727.6 97.10 4481.65 8653.44 77.01 10822.5 94.90 4503,32 8745.82 76.59 10841.2 18.70 4507.67 8764.01 76.54 331.5 7518.25 -3893.50 8466.60 332.62 0.65 331.2 7599.21 -3937.74 8558.84 332.61 0.54 331.7 7682.33 -3982.96 8653.44 332.60 0.50 331.5 7763.60 -4026.90 8745.82 332.58 0.49 331.4 7779.58 -4035.59 8764.01 332.58 0.58 10959.4 118.20 4535.71 8878.79 76.01 11055.7 96.30 4559.25 8972.11 75.69 11151.5 95.80 4582.57 9064.99 76.14 11247.2 95.70 4605.90 9157.79 75.64 11342.7 95.50 4629.37 9250.36 75.90 330.9 7880.15 -4091.00 8878.79 332.56 0.61 330.3 7961.50 -4136.84 8972.12 332.54 0.69 331.5 8042.69 -4182.03 9065.00 332.53 1.30 332.2 8124.52 -4225.81 9157.80 332.52 0.88 333.0 8206.71 -4268.41 9250.37 332.52 0.86 Page 3 Schlumberger ANAl)RILL Survey Report 21-FEB-97 01:56:18 Page 004 Minimum Cumvature Method MEASURED INTERVAL VERTICAL TARGET STATION DEPTH DEPTH SECTION INCLN. FT FT FT FT DEG 11437.7 95.00 4651.89 9342.65 76.68 11533.4 95.70 4673.05 9435.98 77.77 11629.1 95.70 4693.51 9529.46 77.54 11725.6 96.50 4713.76 9623.81 78.24 11821.1 95.50 4734.03 9717.12 77.25 AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS N/-S E/-W CEMENT DEG FT FT FT DEG D/HF 331.7 8288.46 -4311.24 9342.66 332.52 1.56 332.1 8370.79 -4355.20 9435.99 332.51 1.21 332.4 8453.52 -4398.73 9529.47 332.51 0.39 333.8 8537.66 -4441.42 9623.82 332.52 1.59 333.3 8621.22 -4482.98 9717.13 332.53 1.16 11915.9 94.80 4754.77 9809.62 77.48 12010.6 94.70 4774.12 9902.27 78.94 12107.7 97.10 4793.10 9997.39 78.51 12203.6 95.90 4812.96 10091.16 77.59 12298.6 95.00 4834.18 10183.75 76.60 333.1 8703.79 -4524.69 9809.62 332.53 0.32 335.4 8787.28 -4564.96 9902.27 332.55 2.83 335.2 8873.79 -4604.75 9997.39 332.57 0.49 333.7 8958.43 -4645.21 10091.16 332.59 1.81 333.0 9041.19 -4686.74 10183.75 332.60 1.27 12394.4 95.80 4856.81 10276.84 76.07 12490.2 95.80 4879.68 10369.87 76.31 12585.7 95.50 4901.83 10462.76 76.87 12682.3 96.60 4924.39 10556.68 76.11 12777.3 95.00 4947.87 10648.73 75.27 332.7 9124.03 -4729.22 10276.84 332.60 0.63 332.2 9206.51 -4772.25 10369.87 332.60 0.57 333.6 9289.20 -4814.57 10462.76 332.60 1.54 332.6 9372.97 -4857.06 10556.68 332.61 1.28 332.1 9454.50 -4899.78 10648.73 332.60 1.02 12872.5 95.20 4972.10 10740.79 75.25 12967.8 95.30 4995.39 10833.19 76.46 13063.6 95.80 5018.73 10926.10 75.33 13159.7 96.10 5043.25 11019.01 75.11 13255.6 95.90 5067.42 11111.80 75.69 331.7 9535.72 -4943.14 10740.79 332.60 0.41 333.7 9617.83 -4985.52 10833.19 332.60 2.40 332.8 9700.80 -5027.33 10926.10 332.61 1.49 333.5 9783.70 -5069.30 11019.01 332.61 0.74 333.7 9866.83 -5110.57 11111.80 332.62 0.64 13350.7 95.10 5090.90 11203.94 75.72 13445.1 94.40 5113.90 11295.47 76.08 13541.6 96.50 5136.90 11389.17 76.34 13637.0 95.40 5158.47 11482.09 77.53 13732.0 95.00 5179.54 11574.69 76.84 333.8 9949.48 -5151.33 11203.94 332.63 0.11 334.1 10031.73 -5191.53 11295.47 332.64 0.49 332.9 10115.60 -5233.35 11389.18 332.65 1.24 334.3 10198.84 -5274.67 11482.09 332.65 1.90 333.5 10282.03 -5315.42 11574.70 332.66 1.10 13827.4 95.40 5201.90 11667.43 76.05 13922.4 95.00 5225.30 11759.50 75.43 14017.0 94.60 5248.97 11851.09 75.60 14112.2 95.20 5271.75 11943.52 76.71 14207.6 95.40 5294.17 12036.23 76.10 333.0 10364.84 -5357.16 11667.44 332.67 0.97 333.0 10446.88 -5398.96 11759.51 332.67 0.65 332.6 10528.34 -5440.83 11851.10 332.67 0.45 333.4 10610.70 -5482.79 11943.53 332.67 1.42 334.0 10693.83 -5523.87 12036.24 332.68 0.88 14302.3 94.70 5316.87 12128.15 76.16 14398.2 95.90 5338.95 12221.46 77.22 14493.7 95.50 5360.65 12314.44 76.51 14588.5 94.80 5382.57 12406.66 76.76 14685.0 96.50 5403.86 12500.76 77.75 333.3 10776.21 -5564.68 12128.17 332.69 0.72 334.1 10859.88 -5606.03 12221.48 332.70 1.37 333.3 10943.25 -5647.23 12314.46 332.70 1.10 333.8 11025.83 -5688.31 12406.68 332.71 0.58 334.0 11110.35 -5729.72 12500.79 332.72 1.05 14779.6 94.60 5424.49 12593.05 77.05 14875.5 95.90 5446.54 12686.36 76.37 14970.9 95.40 5469.42 12778.97 75.87 15066.7 95.80 5492.70 12871.89 76.01 15162.2 95.50 5515.11 12964.72 76.84 334.0 11193.33 -5770.19 12593.08 332.73 0.74 333.7 11277.11 -5811.32 12686.40 332.74 0.77 333.0 11359.88 -5852.86 12779.00 332.74 0.88 332.0 11442.31 -5895.77 12871.93 332.74 1.02 332.3 11524.39 -5939.14 12964.76 332.74 0.92 15257.7 95.50 5536.78 13057.73 76.93 15352.6 94.90 5557.52 13150.33 77.83 15448.3 95.70 5578.36 13243.73 77.01 15543.1 94.80 5599.94 13336.03 76.67 15639.4 96.30 5621.81 13429.80 77.08 332.5 11606.82 -5982.23 13057.77 332.73 0.22 333.7 11689.40 -6024.13 13150.37 332.74 1.56 333.0 11772.88 -6066.02 13243.77 332.74 1.12 333.8 11855.42 -6107.35 13336.07 332.74 0.90 332.5 11939.09 -6149.71 13429.85 332.75 1.38 Page 4 Schlumberger ANADRILL Survey Report 21-FEB-97 01:56:18 Minimum Curvature Method MEASURED INTERVAL VERTICAL TARGET STATION DEPTH DEPTH SECTION INCLN. FT FT FT FT DEG 15735.0 95.60 5642.64 13523.11 77.75 15829.0 94.00 5663.04 13614.87 77.19 15925.3 96.30 5684.94 13708.64 76.52 16021.3 96.00 5707.73 13801.89 76.01 16117.3 96.00 5731.48 13894.89 75.34 16212.8 95.50 5756.38 13987.05 74.44 16307.7 94.90 5783.73 14077.85 72.05 16404.2 96.50 5816.01 14168.71 68.86 16499.1 94.90 5852.44 14256.27 65.99 16595.0 95.90 5892.27 14343.39 64.93 16690.5 95.50 5933.68 14429.33 63.68 16786.4 95.90 5978.37 14513.99 60.76 16881.0 94.60 6025.75 14595.70 59.13 16977.8 96.80 6076.09 14678.33 58.21 17072.9 95.10 6127.52 14758.32 56.31 17167.4 94.50 6181.05 14836.19 54.68 17263.3 95.90 6237.74 14913.53 52.84 17358.7 95.40 6296.99 14988.28 50.36 17454.4 95.70 6359.84 15060.43 47.53 17548.0 93.60 6424.49 15128.10 45.09 17644.7 96.70 6494.43 15194.86 42.25 17739.5 94.80 6566.24 15256.73 39.26 17834.2 94.70 6641.19 15314.58 36.07 17930.0 95.80 6719.69 15369.48 33.87 18026.9 96.90 6800.77 15422.54 32.54 18121.8 94.90 6881.21 15472.86 31.56 18218.7 96.90 6964.10 15522.99 30.82 18313.6 94.90 7045.80 15571.21 30.33 18409.0 95.40 7128.40 15618.91 29.72 18504.6 95.60 7211.60 15666.00 29.31 Page 005 18600.6 96.00 7295.55 15712.54 28.72 18695.4 94.80 7378.92 15757.64 28.13 18720.8 25.40 7401.33 15769,59 28.03 Projected to TD 18810.0 89.20 7480.07 15811.51 AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS N/-S E/-W CEMENT DEG FT FT FT DEG D/HF 332.7 12021.93 -6192.65 13523.15 332.75 0.73 332.1 12103.24 -6235.16 13614.91 332.74 0.86 332.4 12186.23 -6278.82 13708.68 332.74 0.76 331.9 12268.69 -6322.39 13801.93 332.74 0.73 331.2 12350.47 -6366.70 13894.92 332.73 0.99 330~9 12431.15 -6411.33 13987.08 332.72 0.99 329.9 12510.15 -6456.20 14077.87 332.70 2.71 331.0 12589.25 -6501.05 14168.73 332.69 3.48 329.9 12665.47 -6544.26 14256.28 332.67 3.21 329.5 12740.79 -6588.27 14343.40 332.66 1.17 329.6 12814.98 -6631 328.3 12887.67 -6675 329.6 12957.80 -6717 332,0 13029.97 -6758 333.4 13101.04 -6794 .88 14429.33 332.64 1.31 .63 14513.99 332.62 3.27 .86 14595.70 332.60 2.09 .20 14678.33 332.59 2.32 .90 14758.32 332.59 2.35 332.6 13170.43 -6830 333.5 13239.37 -6865 333.0 13306.13 -6898 333.5 13370.56 -6931 333.7 13431.18 -6961 .25 14836.19 332.59 1.86 .31 14913.53 332.59 2.06 .95 14988.28 332.59 2.63 .43 15060.43 332.60 2.98 .53 15128.10 332.60 2.61 332.4 13490.70 -6991 334.2 13545.96 -7019 333.2 13597.84 -7045 333.3 13646.87 -7069 333.5 13694.31 -7093 .77 15194.86 332.60 3.08 .60 15256.73 332.61 3.39 .21 15314.58 332.61 3.43 .93 15369.48 332.61 2.30 .69 15422.54 332.62 1.38 335.7 13739.79 -7115 334.7 13785.35 -7136 335.5 13829.13 -7156 333.8 13872.27 -7177 333.7 13914.51 -7197 .30 15472.86 332.62 1.61 .34 15522.99 332.63 0.93 .67 15571.21 332.64 0.67 .10 15618.92 332.64 1.10 .93 15666.00 332.65 0.43 335.2 13956.51 -7218.02 15712.54 333.1 13997.12 -7237.68 15757.65 333.4 14007.80 -7243.06 15769.60 332.65 0.98 332.66 1.22 332.66 0.68 28.03 333.5 14045.28 -7261.83 15811.52 332.66 0.00 Page 5 F PAD, WELL NO. MPF-42i MILNE POINT FIELD, ALASKA Gyro Multishot Survey Inside 7"CASING Survey date: 23- MAP,, 1997 Job number :A0397GCE388 CONTENTS JOB NUMBER :A0397GCE388 1. DISCUSSION , SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT DISCUSSION; SURVEY CERTIFICATION SHEET DISCUSSION JOB NUMBER' A0397GCE388 Tool 758 was run in WELL# MPF-42i on ATLAS 5/16" wireline inside casing. The survey was run without problems. SURVEY CERTIFICATION SHEET JOB NUMBER · A0397GCE388 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the wellsite. Checked by :- ROB SHOUP OPERATIONS MANAGER 2. SURVEY DETAILS SURVEY DETAILS JOB NUMBER: A0397GCE388 CLIENT: B.P. EXPLORATION RIG: ATLAS LOCATION: F PAD, ALASKA WELL: MPF-42 LATITUDE: 70.505 N LONGITUDE: 149.5 W SURVEY DATE: SURVEY TYPE : 23, MAR, 1997 GYRO MULTISHOT IN 7" CASING DEPTH REFERENCE: 41.5' MAX. SURVEY DEPTH: ROTARY TABLE ELEVATION 18517' SURVEY TIED ONTO: NA SURVEY INTERVAL: 0-18517' APl NUMBER: 050-029-22741 TARGET DIRECTION: 332.63 GRID CORRECTION: N/A CALCULATION METHOD: MINIMUM CURVATURE SURVEYOR: TOM STODDARD 3. OUTRUN SURVEY LISTING A Gyroda t a D i re c t i onal Survey for B.P. EXPLORATION F PAD, WELL NO. MPF-42i MILNE POINT FIELD, ALASKA 3ob Number: A0397GCE388 Run Date: 23-Mar-97 11:30:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.505000 deg. N Sub-sea Correction from Vertical Reference: 41.5 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 332.630 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyrodat a D i re c t i ona i Survey B.P. EXPLORATION F PAD, WELL NO. MPF-42i MILNE POINT FIELD, ALASKA Job Number: A0397GCE388 MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet 0 100 200 306 400 500 601 700 8O0 901 1000 1100 1200 1301 1400 1500 1600 1650 1700 1750 1800 1850 1900 1950 2000 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 0.00 0.00 0.0 .04 306.96 100.0 .05 356.71 200.0 .20 349.68 306.0 1.64 328.98 400.0 2.79 329.12 499.9 3.84 331.54 600.7 6.02 329.80 699.4 7.64 331.72 798.7 8.98 334.14 898.6 12.26 338.36 995.9 15.04 340.11 .1093.0 16.80 339.73 1189.2 18.52 339.19 1285.4 20.96 336.80 1378.6 22.16 335.33 1471.6 24.56 333.50 1563.4 25.54 333.46 1608.7 26.70 333.19 1653.6 27.47 332.98 1698.1 · 0 ~ 28.16 332.59 · 0 ~? 28.79 332.17 0 ~ 29.4 '3.'~i~,~ 332.13 · 0 ~ 3.'0.416>..-,~ 332.12 ~>~'~'~ 3'i 98,.~-~' 332 16 1742.3 1786.3 1830.0 1873.3 1916.1 DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. 0.0 0.00 0.0 0.0 .0 .04 .0 307.0 .1 .04 .1 326.0 .3 .14 .3 343.6 1.8 1.55 1.8 333.4 5.7 11.5 20.0 31.9 46.5 64.7 88.1 115.3 145.8 179.0 215.7 255.3 276.5 298.5 321.3 344.6 368.5 392.8 417.7 443.7 1.15 5.7 330.4 1.05 11.5 330.5 2.20 20.0 330.5 1.63 31.9 330.6 1.37 46.5 331.4 3.40 64.7 332.8 2.81 88.2 334.6 1.76 115.5 335.8 1.71 146.1 336.6 2.60 179.5 336.8 1.31 216.3 336.7 2.50 255.9 336.3 1.97 277.0 336.1 2.32 299.0 335.9 1.56 321.8 335.7 1.42 345.1 335.5 1.32 368.9 335.3 1.28 393.2 335.1 2.07 418.1 334.9 3.04 444.0 334.8 Page HORIZONTAL COORDINATES feet 0.00 N 0.00 E .02 N .03 W .08 N .05 W .31 N .09 W 1.62 N .81 W 4.93 N 2.80 W 10.02 N 5.68 W 17.43 N 9.87 W 27.82 N 15.66 W 40.83 N 22.28 W 57.56 N 29.53 W 79.64 N 37.87 W 105.40 N 47.29 W 134.08 N 58.04 W 165.06 N 70.60 W 198.64 N 85.52 W 234.39 N 102.67 W 253.33 N 112.12 W 273.00 N 122.01 W 293.30 N 132.31 W 314.05 N 142.99 W 335.17 N 154.04 W 356.67 N 165.40 W 378.73 N 177.07 W 401.65 N 189.18 W A Gyroda t a D i re c t iona i Survey B.P. EXPLORATION F PAD, WELL NO. MPF-42i ~ILNE POINT FIELD, ALASKA 3ob Number: A0397GCE388 Page ~EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 2050 2100 2150 2200 2250 .0 33.03 332.17 1958.2 .0 34.84 332.34 1999.7 .0 36.19 332.71 2040.4 .0 37.55 333.30 2080.4 .0 38.64 333.73 2119.8 470.5 498.4 527.5 557.5 588.3 2.10 470.8 334.6 3.62 498.7 334.5 2.74 527.7 334.4 2.81 557.7 334.3 2.23 588.6 334.3 425.41 N 201.72 W 450.11 N 214.72 W 475.88 N 228.11 W 502.61 N 241.73 W 530.22 N 255.48 W 2300 2350 2400 2450 2500 .0 39.65 333.92 2158.5 .0 41.33 334.05 2196.6 .0 42.58 334.21 2233.7 .0 44.27 334.04 2270.1 .0 45.55. 334.03 2305.5 619.9 652.3 685.8 720.1 755.4 2.04 620.1 334.3 3.37 652.6 334.2 2.50 686.0 334.2 3.39 720.4 334.2 2.55 755.7 334.2 558.55 N 269.41 W 587.73 N 283.65 W 617.80 N 298.23 W 648.73 N 313.23 W 680.46 N 328.68 W 2550 2600 2650 2700 2750 .0 47.02 334.08 2340.0 .0 48.09 334.05 2373.8 .0 49.89 334.00 2406.6 .0 51.04 333.99 2438.4 .0 52.61 333.97 2469.3 791.5 828.4 866.1 904.7 944.0 2.94 791.8 334.2 2.14 828.7 334.2 3.61 866.4 334.2 2.29 905.0 334.2 3.15 944.3 334.2 712.96 N 344.49 W 746.14 N 360.63 W 780.05 N 377.15 W 814.71 N 394.06 W 850.03 N 411.30 W 2800 2850 2900 2950 3000 .0 53.80 333.92 2499.3 .0 54.92 333.89 2528.4 .0 55.96 333.91 2556.8 .0 57.68 333.93 2584.1 .0 59.04 333.88 2610.3 984.0 1024.6 1065.8 1107.6 1150.2 2.37 984.3 334.2 2.24 1025.0 334.2 2.08 1066.2 334.1 3.44 1108.0 334.1 2.72 1150.6 334.1 886.00 N 922.49 N 959.47 N 997.05 N 1035.28 N 428.89 W 446.76 W 464.88 W 483.27 W 501.99 W 3050.0 60.70 333.87 2635.4 3100.0 62.12 334.16 2659.4 3150.0 62.84 334.37 2682.5 3200.0 62.97 334.65 2705.2 3250.0 63.34 334.82 2727.8 1193.4 1237.3 1281.6 1326.1 1370.7 .33 1193.8 334.1 .88 1237.7 334.1 .48 1282.1 334.1 .57 1326.6 334.1 .79 1371.2 334.2 1074.11 N 1113.57 N 1153.52 N 1193.70 N 1234.04 N 521.04 W 540.27 W 559.52 W 578.68 W 597.72 W A Gyroda t a D i re c t i ona i Survey B.P. EXPLORATION ? PAD, WELL NO. MPF-42i ~ILNE POINT FIELD, ALASKA /ob Number: A0397GCE388 Page ~EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 3300.0 64.88 334.63 2749.7 3350.0 66.51 334.41 2770.2 3400.0 68.11 334.27 2789.5 3450.0 69.52 334.04 2807.6 3500.0 71.28 333.86 2824.4 1415.6 3.10 1416.2 334.2 1461.2 3.29 1461.7 334.2 1507.3 3.20 1507.8 334.2 1553.9 2.85 1554.5 334.2 1601.0 3.55 1601.6 334.2 1274.71 N 1315.85 N 1357.43 N 1399.39 N 1441.71 N 616.92 W 636.52 W 656.50 W 676.82 W 697.50 W 3550.0 72.41 333.75 2839.9 3600.0 74.06 333.57 2854.4 3650.0 74.99 333.30 2867.7 3700.0 75.88 333.09 2880.3 3750.0 76.30 332.95 2892.3 1648.5 2.27 1649.1 334.2 1696.3 3.31 1697.0 334.2 1744.5 1.94 1745.1 334.1 1792.9 1.82 1793.5 334.1 1841.5 .88 1842.0 334.1 1484.34 N 1527.24 N 1570.34 N 1613.54 N 1656.79 N 718.47 W 739.71 W 761.26 W 783.08 W 805.10 W 3800.0 76.42 332.70 2904.1 3850.0 76.61 332.50 2915.7 3900.0 76.98 332.56 2927.2 3950.0 77.03 332.59 2938.4 4000.0 77.78 332.48 2949.3 1890.0 .54 1890.6 334.1 1938.7 .56 1939.2 334.0 1987.3 .76 1987.9 334.0 2036.1 .12 2036.6 333.9 2084.9 1.50 2085.4 333.9 1700.01 N 1743.18 N 1786.37 N 1829.62 N 1872.91 N 827.29 W 849.67 W 872.12 W 894.56 W 917.07 W 4050.0 78.03 332.47 2959.8 4100.0 78.03 332.45 2970.1 4150.0 78.41 332.38 2980.4 4200.0 78.61 332.27 2990.3 4250.0 78.48 332.18 3000.3 2133.7 .51 2134.3 333.9 2182.7 .03 2183.2 333.8 2231.6 .77 2232.1 333.8 2280.6 .46 2281.1 333.8 2329.6 .31 2330.1 333.8 1916.27 N 1959.64 N 2003.02 N 2046.41 N 2089.77 N 939.66 W 962.28 W 984.94 W 1007.70 W 1030.54 W 4300.0 78.62 332.13 3010.2 4350.0 78.85 332.06 3019.9 4400.0 79.13 332.11 3029.5 4450.0 77.57 332.60 3039.6 4500.0 77.25 332.84 3050.5 2378.6 .31 2379.0 333.7 2427.6 .48 2428.1 333.7 2476.7 .56 2477.1 333.7 2525.7 3.26 2526.1 333.6 2574.5 .78 2574.9 333.6 2133.10 N 2176.43 N 2219.80 N 2263.18 N 2306.55 N 1053.43 W 1076.38 W 1099.35 W 1122.07 W 1144.44 W A Gyroda t a D i re c t i ona i Survey ½.P. EXPLORATION PAD, WELL NO. MPF-42i 4ILNE POINT FIELD, ALASKA Tob Number: A0397GCE388 Page 4EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 4550.0 77.01 332.82 3061.6 4600.0 76.98 333.00 3072.9 4650.0 77.15 333.01 3084.1 4700.0 77.05 332.91 3095.2 4750.0 77.08 332.90 3106.4 2623.2 .49 2623.6 333.6 2671.9 .34 2672.3 333.6 2720.7 .34 2721.0 333.6 2769.4 .29 2769.8 333.6 2818.1 .07 2818.5 333.6 2349.92 N 2393.29 N 2436.71 N 2480.13 N 2523.51 N 1166.70 W 1188.88 W 1211.00 W 1233.16 W 1255.35 W 4800.0 76.83 332.81 3117.7 4850.0 77.11 332.71 3129.0 4900.0 77.40 332.70 3140.0 4950.0 77.74 332.58 3150.8 5000.0 77.23 332.89 3161.6 2866.9 .53 2867.2 333.5 2915.6 .61 2915.9 333.5 2964.3 .56 2964.7 333.5 3013.2 .72 3013.5 333.5 3062.0 1.17 3062.3 333.5 2566.85 N 2610.16 N 2653.50 N 2696.87 N 2740.26 N 1277.57 W 1299.87 W 1322.24 W 1344.67 W 1367.03 W 5050.0 77.19 333.45 3172.7 5100.0 77.30 333.44 3183.7 5150.0 77.79 333.52 3194.5 5200.0 76.84 333.55 3205.5 5250.0 76.41 333.60 3217.0 3110.7 1.08 3111.1 333.5 3159.5 .21 3159.8 333.5 3208.3 .99 3208.7 333.5 3257.1 1.88 3257.4 333.5 3305.7 .87 3306.1 333.5 2783.77 N 2827.39 N 2871.07 N 2914.74 N 2958.30 N 1389.04 W 1410.84 W 1432.64 W 1454.38 W 1476.03 W 5300.0 76.43 333.65 3228.8 5350.0 76.58 333.64 3240.5 5400.0 76.62 333.75 3252.0 5450.0 76.69 333.78 3263.6 5500.0 75.25 333.70 3275.7 3354.3 .12 3354.7 333.5 3402.9 .29 3403.3 333.5 3451.6 .22 3451.9 333.5 3500.2 .16 3500.6 333.5 3548.7 2.89 3549.1 333.5 3001.85 N 3045.41 N 3089.02 N 3132.65 N 3176.15 N 1497.62 W 1519.20 W 1540.76 W 1562.26 W 1583.72 W 5550.0 74.87 333.64 3288.6 5600.0 74.95 333.56 3301.6 5650.0 75.08 333.50 3314.5 5700.0 75.57 333.45 3327.2 5750.0 75.77 333.49 3339.6 3597.0 .76 3597.4 333.5 3645.3 .22 3645.7 333.5 3693.6 .27 3694.0 333.5 3741.9 1.00 3742.4 333.5 3790.4 .41 3790.8 333.5 3219.45 N 3262.70 N 3305.93 N 3349.21 N 3392.55 N 1605.15 W 1626.61 W 1648.14 W 1669.74 W 1691.38 W A Gyrodat a D i re c t i ona i Survey B.P. EXPLORATION F PAD, WELL NO. MPF-42i MILNE POINT FIELD, ALASKA Job Number: A0397GCE388 Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 5800.0 5850.0 5900.0 5950.0 6000.0 75.60 333.48 3351.9 75.35 333.19 3364.5 75.58 333.29 3377.0 75.69 333.19 3389.4 75.60 333.09 3401.8 3838.8 .35 3839.3 333.5 3887.2 .76 3887.7 333.5 3935.6 .51 3936.1 333.5 3984.0 .29 3984.5 333.5 4032.5 .27 4032.9 333.5 3435.91 N 3479.16 N 3522.38 N 3565.63 N 3608.84 N 1713.01 W 1734.73 W 1756.52 W 1778.33 W 1800.21 W 6050.0 6100.0 6150.0 6200.0 6250.0 75.69 332.95 3414.2 75.79 332.97 3426.5 75.73 332.99 3438.8 75.97 332.96 3451.1 76.53 332.99 3462.9 4080.9 .32 4081.4 333.5 4129.4 .20 4129.8 333.5 4177.8 .13 4178.3 333.5 4226.3 .47 4226.8 333.5 4274.9 1.12 4275.3 333.5 3652.01 N 3695.17 N 3738.34 N 3781.53 N 3824.80 N 1822.19 W 1844.22 W 1866.24 W 1888.27 W 1910.33 W 6300.0 6350.0 6400.0 6450.0 6500.0 76.98 333.14 3474.4 77.03 333.18 3485.6 77.47 333.37 3496.7 77.85 333.62 3507.4 78.20 333.79 3517.7 4323.5 .95 4324.0 333.5 4372.3 .13 4372.7 333.5 4421.0 .95 4421.5 333.5 4469.9 .91 4470.3 333.5 4518.8 .78 4519.2 333.5 3868.19 N 3911.66 N 3955.22 N 3998.93 N 4042.78 N 1932.38 W 1954.38 W 1976.31 W 1998.10 W 2019.77 W 6550.0 6600.0 6650.0 6700.0 6750.0 77.64 333.82 3528.2 77.44 333.96 3539.0 77.78 333.88 3549.7 77.75 334.01 3560.3 77.73 334.17 3570.9 4567.7 1.13 4568.1 333.5 4616.5 .47 4617.0 333.5 4665.3 .70 4665.8 333.5 4714.1 .26 4714.7 333.5 4763.0 .31 4763.5 333.5 4086.65 N 4130.49 N 4174.36 N 4218.25 N 4262.20 N 2041.35 W 2062.84 W 2084.31 W 2105.77 W 2127.12 W 6800.0 6850.0 6900.0 6950.0 7000.0 77.65 334.13 3581.6 77.44 334.06 3592.4 77.64 334.08 3603.1 77.67 334.10 3613.8 77.57 334.15 3624.6 4811.8 .17 4812.4 333.5 4860.6 .44 4861.2 333.5 4909.4 .40 4910.0 333.5 4958.3 .08 4958.8 333.5 5007.1 .24 5007.7 333.5 4306.17 N 4350.08 N 4393.99 N 4437.92 N 4481.87 N 2148.42 W 2169.75 W 2191.10 W 2212.44 W 2233.76 W A Gyrodat a D i re c t i ona i Survey B.P. EXPLORATION F PAD, WELL NO. MPF-42i MILNE POINT FIELD, ALASKA Job Number: A0397GCE388 Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 7050.0 77.63 334.08 3635.3 7100.0 77.74 334.17 3646.0 7150.0 78.24 334.21 3656.4 7200.0 77.52 334.15 3666.9 7250.0 77.61 334.13 3677.6 5055.9 5104.7 5153.6 5202.5 5251.3 .18 5056.5 333.5 .27 5105.3 333.5 .01 5154.3 333.5 .44 5203.1 333.5 .18 5252.0 333.5 4525.80 N 4569.75 N 4613.78 N 4657.78 N 4701.72 N 2255.07 W 2276.39 W 2297.69 W 2318.98 W 2340.28 W 7300.0 77.51 334.14 3688.4 7350.0 77.25 334.09 3699.3 7400.0 76.09 333.97 3710.9 7450.0 75.81 333.87 3723.0 7500.0 76.02 333.97 3735.2 5300.1 5348.9 5397.5 5446.0 5494.5 .20 5300.8 333.5 .53 5349.6 333.5 .32 5398.2 333.6 .60 5446.7 333.6 .46 5495.2 333.6 4745.65 N 4789.55 N 4833.29 N 4876.86 N 4920.42 N 2361.58 W 2382.88 W 2404.18 W 2425.50 W 2446.82 W 7550.0 76.13 334.04 3747.2 7600.0 76.36 334.12 3759.1 7650.0 75.72 334.44 3771.1 7700.0 74.55 334.69 3784.0 7750.0 74.53 334.85 3797.3 5543.0 5591.6 5640.1 5688.4 5736.5 .27 5543.7 333.6 .47 5592.3 333.6 .41 5640.8 333.6 .39 5689.2 333.6 .33 5737.3 333.6 4964.04 N 5007.72 N 5051.44 N 5095.08 N 5138.67 N 2468.09 W 2489.32 W 2510.38 W 2531.13 W 2551.67 W 7800.0 74.87 335.16 3810.5 7850.0 75.06 335.48 3823.5 7900.0 75.03 335.73 3836.4 7950.0 74.85 335.69 3849.3 8000.0 74.26 335.69 3862.7 5784.7 5832.9 5881.2 5929.4 5977.5 .91 5785.5 333.6 .73 5833.8 333.6 .47 5882.1 333.6 .38 5930.3 333.7 .17 5978.5 333.7 5182.38 N 5226.26 N 5270.26 N 5314.27 N 5358.19 N 2572.05 W 2592.21 W 2612.16 W 2632.03 W 2651.86 W 8050.0 73.28 335.49 3876.6 8100.0 72.61 335.66 3891.3 8150.0 72.76 336.10 3906.2 8200.0 72.91 336.15 3920.9 8250.0 73.60 336.00 3935.3 6025.5 6073.2 6120.9 6168.5 6216.3 2.01 6026.5 333.7 1.36 6074.3 333.7 .89 6122.0 333.7 .32 6169.7 333.7 1.41 6217.5 333.8 5401.90 N 5445.42 N 5488.99 N 5532.68 N 5576.44 N 2671.70 W 2691.47 W 2710.98 W 2730.31 W 2749.73 W A Gyroda t a D i r e c t i ona i Survey B.P. EXPLORATION F PAD, WELL NO. MPF-42i MILNE POINT FIELD, ALASKA Job Number: A0397GCE388 Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 8300.0 74.15 335.97 3949.~ 8350.0 74.94 335.87 3962.6 8400.0 75.47 335.72 3975.3 8450.0 76.25 335.62 3987.5 8500.0 76.42 335.66 3999.4 6264.3 1.09 6265.5 333.8 6312.4 1.60 6313.7 333.8 6360.7 1.09 6362.0 333.8 6409.1 1.58 6410.5 333.8 6457.6 .35 6459.0 333.8 5620.32 N 5664.31 N 5708.40 N 5752.58 N 5796.84 N 2769.28 W 2788.~94 W 2808.76 W 2828.74 W 2848.78 W 8550.0 76.50 335.72 4011.1 8600.0 76.76 335.68 4022.6 8650.0 77.63 335.72 4033.7 8700.0 77.94 335.65 4044.3 8750.0 77.95 335.68 4054.7 6506.1 .20 6507.6 333.8 6554.7 .53 6556.2 333.9 6603.4 1.76 6605.0 333.9 6652.2 .62 6653.8 333.9 6701.0 .06 6702.7 333.9 5841.14 N 5885.48 N 5929.91 N 5974.45 N 6019.00 N 2868.79 W 2888.81 W 2908.87 W 2928.99 W 2949.14 W 8800.0 77.78 334.95 4065.2 8850.0 77.71 334.62 4075.9 8900.0 77.45 334.68 4086.6 8950.0 77.40 334.61 4097.5 9000.0 77.38 333.87 4108.4 6749.9 1.46 6751.5 333.9 6798.7 .66 6800.4 333.9 6847.5 .55 6849.2 333.9 6896.3 .17 6898.0 333.9 6945.0 1.43 6946.8 333.9 6063.41 N 6107.62 N 6151.75 N 6195.84 N 6239.79 N 2969.56 W 2990.37 W 3011.28 W 3032.17 W 3053.38 W 9050.0 77.07 333.63 4119.5 9100.0 76.69 333.82 4130.8 9150.0 76.38 333.71 4142.5 9200.0 76.14 333.79 4154.3 9250.0 76.08 333.91 4166.3 6993.8 .79 6995.6 333.9 7042.5 .84 7044.3 333.9 7091.1 .66 7092.9 333.9 7139.6 .50 7141.5 333.9 7188.2 .26 7190.0 333.9 6283.52 N 3074.95 W 6327.19 N 3096.50 W 6370.80 N 3118.00 W 641 3139.47 W 6457.94 N 3160.86 W 9300.0 76.68 333.49 4178.1 9350.0 76.46 333.29 4189.7 9400.0 77.21 333.27 4201.1 9450.0 76.89 333.36 4212.3 9500.0 76.61 333.32 4223.8 7236.8 1.45 7238.6 333.9 7285.4 .58 7287.2 333.9 7334.1 1.49 7335.9 333.9 7382.8 .65 7384.6 333.9 7431.5 .58 7433.3 333.9 6501.50 N 6544.98 N 6588.47 N 6632.00 N 6675.50 N 3182.40 W 3204.18 W 3226.07 W 3247.95 W 3269.79 W A Gyroda t a D i re c t i ona i Survey B.P. EXPLORATION F PAD, WELL NO. MPF-42i ~ILNE POINT FIELD, ALASKA 3ob Number: A0397GCE388 Page ~EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 9550.0 9600.0 9650.0 9700.0 9750.0 76.61 333.29 4235.4 77.30 333.22 4246.7 76.74 333.14 4257.9 76.26 333.13 4269.6 76.52 333.17 4281.3 7480 7528 7577 7626 7674 .1 .8 .5 .1 .7 .05 7481.9 333.9 .40 7530.~6 333.9 .14 7579.4 333.9 .96 7628.0 333.9 .52 7676.6 333.9 6718.95 N 6762.45 N 6805.93 N 6849.30 N 6892.66 N 3291.65 W 3313.57 W 3335.55 W 3357.52 W 3379.47 W 9800.0 9850.0 9900.0 9950.0 10000.0 76.79 333.17 4292.9 76.54 333.16 4304.4 76.01 333.11 4316.3 76.62 333.04 4328.1 76.82 333.04 4339.6 7723 7772 7820 7869 7917 .4 .0 .6 .2 .8 .55 7725.2 333.9 .50 7773.9 333.9 1.07 7822.4 333.9 1.23 7871.0 333.9 .40 7919.7 333.9 6936.07 N 6979.49 N 7022.82 N 7066.13 N 7109.51 N 3401.43 W 3423.39 W 3445.34 W 34 W 3489.40 W 10050.0 10100.0 10150.0 10200.0 10250.0 76.38 333.26 4351.2 76.01 333.12 4363.1 76.90 333.16 4374.8 76.93 333.22 4386.1 76.67 333.22 4397.5 7966 8015 8063 8112 8161 .5 .0 .6 .3 .0 .99 7968.3 333.9 .77 8016.8 333.8 .77 8065.5 333.8 .12 8114.1 333.8 .51 8162.8 333.8 7152.90 N 7196.24 N 7239.60 N 7283.07 N 7326.53 N 3511.37 W 3533.27 W 3555.23 W 3577.19 W 3599.12 W 10300.0 10350.0 10400.0 10450.0 10500.0 76.49 333.22 4409.1 77.20 333.18 4420.5 76.80 333.01 4431.8 76.79 332.90 4443.2 76.90 332.82 4454.6 8209 8258 8307 8355 8404 .6 .3 .0 .7 .4 .36 8211.5 333.8 .41 8260.1 333.8 .86 8308.9 333.8 .21 8357.5 333.8 .28 8406.2 333.8 7369.95 N 7413.40 N 7456.85 N 7500.21 N 7543.53 N 3621.04 W 3642.99 W 3665.03 W 3687.16 W 3709.37 W 10550.0 10600.0 10650.0 10700.0 10750.0 77.50 332.80 4465.7 77.24 332.93 4476.6 76.99 332.86 4487.7 77.04 332.80 4499.0 76.97 332.66 4510.2 8453.2 8502.0 8550.7 8599.4 8648.1 .21 8455.0 333.8 .59 8503.7 333.8 .53 8552.5 333.8 .15 8601.2 333.8 .31 8649.9 333.8 7586.90 N 7630.32 N 7673.71 N 7717.05 N 7760.36 N 3731.65 W 3753.91 W 3776.11 W 3798.36 W 3820.69 W A Gyroda t a D i r e c t i ona i Survey B.P. EXPLORATION F PAD, WELL NO. MPF-42i MILNE POINT FIELD, ALASKA Job Number: A0397GCE388 Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 10800.0 76.51 332.66 4521.7 10850.0 76.65 332.53 4533.3 10900.0 76.12 331.91 4545.1 10950.0 76.31 331.55 4557.0 11000.0 75.75 331.20 4569.0 8696.8 8745.4 8794.0 8842.6 8891.1 .91 8698.6 333.8 .37 8747.2 333.8 .60 8795.8 333.8 .79 8844.3 333.8 .31 8892.8 333.7 7803.59 N 7846.76 N 7889.76 N 7932.53 N 7975.12 N 3843.04 W 3865.42 W 3888.07 W 3911.07 W 3934.31 W 11050.0 75.86 331.62 4581.3 11100.0 76.30 332.44 4593.3 11150.0 76.24 332.28 4605.2 11200.0 76.03 331.99 4617.2 11250.0 75.99 333.16 4629.2 8939.6 8988.1 9036.7 9085.2 9133.7 .83 8941.2 333.7 .83 8989.7 333.7 .33 9038.3 333.7 .71 9086.8 333.7 .28 9135.3 333.7 8017.68 N 8060.55 N 8103.58 N 8146.49 N 8189.55 N 3957.51 W 3980.27 W 4002.80 W 4025.49 W 4047.84 W 11300.0 76.11 334.08 4641.3 11350.0 75.92 333.85 4653.4 11400.0 75.82 333.61 4665.6 11450.0 77.45 333.93 4677.1 11500.0 77.99 334.22 4687.8 9182.2 9230.7 9279.2 9327.9 9376.7 .79 9183.8 333.7 .59 9232.3 333.7 .50 9280.8 333.7 .32 9329.5 333.7 .20 9378.3 333.7 8233.03 N 8276.62 N 8320.10 N 8363.74 N 8407.68 N 4069.40 W 4090.70 W 4112.16 W 4133.66 W 4155.02 W 11550.0 77.62 333.93 4698.3 11600.0 77.37 333.73 4709.2 11650.0 78.33 334.98 4719.7 11700.0 78.42 335.28 4729.8 11750.0 78.20 335.04 4739.9 9425.6 9474.4 9523.2 9572.1 9621.1 .92 9427.2 333.7 .63 9476.0 333.7 .10 9524.9 333.7 .61 9573.9 333.7 .64 9622.8 333.7 8451.63 N 8495.44 N 8539.50 N 8583.94 N 8628.37 N 4176.38 W 4197.91 W 4219.07 W 4239.66 W 4260.23 W 11800.0 77.57 8 475 11850.0 77.21 334.00 11900.0 77.45 334.23 11950.0 78.87 335.90 12000.0 79.10 336.33 0.4 9669.9 1.54 9671.7 4761.3 9718.7 1.34 4772.3 9767.4 .65 4782.5 9816.3 4.32 4792.1 9865.3 .98 333.7 9720.5 9769.3 9818.2 9867.2 8672.61 N 4281.04 W 333.7 8716.57 N 4302.21 W 333.7 8760.46 N 4323.51 W 333.7 8804.83 N 4344.14 W 333.8 8849.70 N 4364.01 W A Gyrodat a D i re c t i ona i Survey B.P. EXPLORATION F PAD, WELL NO. MPF-42i ~ILNE POINT FIELD, ALASKA Job Number: A0397GCE388 Page 10 MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 12050.0 12100.0 12150.0 12200.0 12250.0 78.93 335.99 4801.6 78.66 335.61 4811.3 78.07 335.23 4821.4 77.79 334.88 4831.8 77.12 334.82 4842.7 9914.3 .75 9916.3 333.8 9963.3 .93 9965.3 333.8 10012.2 1.38 10014.2 333.8 10061.1 .90 10063.1 333.8 10109.8 1.34 10111.9 333.8 8894.60 N 8939.34 N 8983.87 N 9028.21 N 9072.39 N 4383.85 W 4403.96 W 4424.32 W 4444.95 W 4465,69 W 12300.0 12350.0 12400.0 12450.0 12500.0 76.85 334.48 4854.0 76.56 334.25 4865.5 76.19 333.92 4877.2 75.96 333.50 4889.3 76.93 333.96 4901.0 10158.5 .86 10160.6 333.8 10207.1 .72 10209.3 333.8 10255.7 .99 10257.9 333.8 10304.2 .92 10306.4 333.8 10352.8 2.13 10355.0 333.8 9116.41 N 9160.28 N 9203.99 N 9247.50 N 9291.09 N 4486.54 W 4507.59 W 4528.83 W 4550.32 W 4571.83 W 12550.0 12600.0 12650.0 12700.0 12750.0 77.40 334.41 76.83 334.37 76.44 334.09 76.12 333.71 75.49 333.38 2.1 10401.6 1.35 10403.7 333.8 4923.3 10450.3 1.16 10452.5 333 4934.8 10498.9 .94 10501.1 333 4946.7 10547.5 .98 10549.7 333 4958.9 10595.9 1.42 10598.2 333 9334.98 N 4593.05 W .8 9378.94 N 4614.10 W .8 9422.75 N 4635.25 W .8 9466.37 N 4656.62 W .8 9509.76 N 4678.21 W 12800.0 12850.0 12900.0 12950.0 13000.0 75.09 333.11 74.87 332.98 76.84 334.00 76.66 333.97 76.12 333.74 4971.6 10644.3 .95 10646.5 333 4984.6 10692.6 .51 10694.8 333 4996.8 10741.1 4.41 10743.3 333 5008.3 10789.7 .37 10792.0 333 5020.0 10838.3 1.18 10840.6 333 .8 9552.95 N 4699.98 W .8 9596.00 N 4721.87 W .8 9639.38 N 4743.50 W .8 9683.12 N 4764.85 W .8 9726.74 N 4786.27 W 13050.0 13100.0 13150.0 13200.0 13250.0 75.58 333.46 75.06 333.21 75.04 333.21 76.33 334.16 75.83 334.11 5032.3 10886.8 1.20 10889.0 333.8 5044.9 10935.1 1.14 10937.4 333.8 5057.8 10983.5 .04 10985.7 333.8 5070.2 11031.9 3.16 11034.2 333.8 5082.2 11080.4 1.00 11082.7 333.8 9770.16 N 9813.39 N 9856.51 N 9899.94 N 9943.61 N 4807.83 W 4829.53 W 4851.30 W 4872.78 W 4893.95 W A Gyroda t a D i re c t iona i Survey B.P. EXPLORATION PAD, WELL NO. MPF-42i ~ILNE POINT FIELD, ALASKA ~ob Number: A0397GCE388 Page 11 ~EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 13300.0 13350.0 13400.0 13450.0 13500.0 75.32 333.90 5094.7 75.94 334.00 5107.1 76.60 334.88 5118.9 76.18 334.74 5130.7 75.77 334.36 5142.8 11128.8 11177.2 11225.8 11274.3 11322.8 1.10 11131.1 333.8 1.26 11179.6 333.8 2.15 11228.1 333.8 .88 11276.7 333.8 1.09 11325.2 333.8 9987.13 N 10030.65 N 10074.47 N 10118.44 N 10162.24 N 4915.17 W 4936.44 W 4957.40 W 4978.09 W 4998.93 W 13550.0 13600.0 13650.0 13700.0 13750.0 77.23 334.51 5154.5 77.99 334.91 5165.2 77.49 334.77 5175.8 77.29 334.61 5186.8 76.93 334.34 5197.9 11371.4 11420.2 11469.0 11517.8 11566.5 .93 11373.8 333.8 .70 11422.7 333.8 .04 11471.5 333.8 .50 11520.3 333.8 .90 11569.0 333.8 10206.10 N 10250.26 N 10294.48 N 10338.59 N 10382.57 N 5019.91 W 5040.77 W 5061.55 W 5082.41 W 5103.41 W 13800.0 13850.0 13900.0 13950.0 14000.0 76.37 334.15 5209.5 75.95 333.96 5221.4 75.71 333.79 5233.7 75.46 333.64 5246.1 75.60 333.75 5258.6 11615.2 11663.7 11712.2 11760.6 11809.0 .18 11617.7 333.8 .91 11666.2 333.8 .58 11714.7 333.8 .58 11763.1 333.8 .35 11811.5 333.8 10426.39 N 10470.04 N 10513.57 N 10556.99 N 10600.39 N 5124.55 W 5145.79 W 5167.13 W 5188.57 W 5210.03 W 14050.0 14100.0 14150.0 14200.0 14250.0 77.12 334.57 5270.4 76.97 334.65 5281.6 76.57 334.60 5293.0 76.29 334.46 5304.8 75.64 334.51 5316.9 11857.5 11906.2 11954.9 12003.5 12051.9 .42 11860.1 333.8 .33 11908.9 333.8 .81 11957.5 333.8 .61 12006.1 333.8 .30 12054.6 333.8 10644.12 N 10688.14 N 10732.12 N 10776.00 N 10819.77 N 5231.20 W 5252.10 W 5272.96 W 5293.86 W 5314.75 W 14300.0 14350.0 14400.0 14450.0 14500.0 76.44 334.66 5329.0 77.72 335.00 5340.1 77.34 334.90 5350.9 76.81 334.69 5362.1 76.65 334.54 5373.6 12100.4 12149.1 12197.9 12246.6 12295.3 .62 12103.2 .65 .9 333.8 .78 12200.7 .15 12249.4 .43 12298.1 333.8 10863.60 N 5335.58 W 10907.71 N 5356.30 W 333.9 10951.94 N 5376.97 W 333.9 10996.03 N 5397.73 W 333.9 11040.00 N 5418.59 W A Gyroda t a D i re c t i ona i Survey t.P. EXPLORATION ~ PAD, WELL NO. MPF-42i [ILNE POINT FIELD, ALASKA rob Number: A0397GCE388 Page 12 ~EASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION 'SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet L4550.0 76.38 334.36 5385.3 L4600.0 77.66 334.50 5396.5 [4650.0 78.13 334.47 5407.0 [4700.0 77.75 334.30 5417.4 [4750.0 77.35 334.21 5428.2 12343.8 .63 12346.7 333.9 12392.5 2.56 12395.4 333.9 12441.4 .95 12444.3 333.9 12490.3 .83 12493.2 333.9 12539.1 .82 12542.0 333.9 11083.86 N 11127.81 N 11171.93 N 11216.02 N 11260.00 N 5439.56 W 5460.59 W 5481.65 W 5502.78 W 5523.99 W [4800.0 77.18 334.08 5439.2 L4850.0 76.63 333.95 5450.6 L4900.0 76.26 333.85 5462.3 ~4950.0 76.12 333.61 5474.2 k5000.0 75.82 333.68 5486.3 12587.8 .42 12590.8 333.9 12636.5 1.12 12639.5 333.9 12685.1 .77 12688.1 333.9 12733.7 .54 12736.6 333.9 12782.2 .62 12785.2 333.9 11303.89 N 11347.67 N 11391.32 N 11434.86 N 11478.33 N 5545.25 W 5566.59 W 5587.97 W 5609.46 W 5631.00 W 15050.0 75.76 333.45 5498.6 15100.0 77.37 333.73 5510.2 15150.0 77.08 333.63 5521.3 15200.0 76.73 333.69 5532.6 15250.0 76.89 333.94 5544.0 12830.6 .46 12833.6 12879.3 3.26 128823.9 12928.0 .61 12931.0 12976.7 .69 12979.7 13025.4 .59 13028.4 333.9 11521.73 N 5652.57 W 11565.28 N 5674.21 W 333.9 11608.99 N 5695.83 W 333.9 11652.63 N 5717.44 W 333.9 11696.32 N 5738.92 W 15300.0 78.29 334.69 5554.8 15350.0 78.00 334.73 5565.0 15400.0 77.64 334.64 5575.6 15450.0 77.26 334.42 5586.5 15500.0 76.90 334.27 5597.6 13074.2 3.15 13077.2 13123.1 .59 13126.1 13171.9 .73 13175.0 13220.7 .88 13223.8 13269.4 .78 13272.6 333.9 11740.32 N 5760.08 W 333.9 11784.56 N 5780.99 W 333.9 11828.74 N 5801.89 W 333.9 11872.81 N 5822.88 W 333.9 11916.73 N 5843.98 W 15550.0 76.74 334.11 5609.0 15600.0 76.52 333.79 5620.6 15650.0 77.97 333.68 5631.6 15700.0 78.15 333.88 5642.0 15750.0 77.76 333.80 5652.4 13318.1 .44 13321.2 13366.7 .77 13369.9 13415.5 2.90 13418.6 13464.4 .54 13467.6 13513.3 .80 13516.5 333.9 11960.56 N 5865.17 W 333.9 12004.27 N 5886.53 W 333.9 12048.00 N 5908.11 W 333.9 12091.88 N 5929.73 W 333.9 12135.77 N 5951.28 W A Gyroda t a D i re c t i ona i Survey ~.P. EXPLORATION ~ PAD, WELL NO. MPF-42i ~ILNE POINT FIELD, ALASKA rob Number: A0397GCE388 Page 13 ~EASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet [5800.0 77.41 333.70 5663.2 [5850.0 77.24 333.65 5674.1 [5900.0 76.81 333.44 5685.4 [5950.0 76.50 333.37 5696.9 [6000.0 76.18 333.16 5708.7 13562.1 13610.9 13659.6 13708.2 13756.8 .73 13565.3 333.9 .34 13614.1 333.9 .95 13662.8 333.9 .63 13711.4 333.9 .77 13760.0 333.9 12179.57 N 12223.29 N 12266.91 N 12310.41 N 12353.81 N 5972.88 W 5994.51 W 6016.22 W 6038.00 W 6059.85 W [6050.0 75.86 332.98 5720.8 [6100.0 75.57 332.79 5733.1 L6150.0 75.45 332.68 5745.6 L6200.0 74.92 332.36 5758.4 L6250.0 73.50 331.00 5772.0 13805.3 13853.8 13902.2 13950.5 13998.6 .73 13808.5 333.9 .69 13857.0 333.9 .32 13905.4 333.9 .22 13953.7 333.9 .87 14001.8 333.8 12397.06 N 12440.19 N 12483.22 N 12526.11 N 12568.46 N 6081.83 W 6103.91 W 6126.09 W 6148.39 W 6171.22 W i6300.0 72.46 330.62 5786.7 16350.0 70.20 330.75 5802.7 16400.0 68.96 330.63 5820.1 16450.0 67.11 330.43 5838.8 16500.0 66.03 330.60 5858.7 14046.4 14093.7 14140.6 14186.9 14232.8 2.20 14049.5 333.8 4.53 14096.8 333.8 2.49 14143.6 333.8 3.71 14189.9 333.8 2.18 14235.7 333.8 12610.20 N 12651.50 N 12692.35 N 12732.72 N 12772.66 N 6194.53 W 6217.72 W 6240.66 W 6263.47 W 6286.05 W 16550.0 65.28 330.39 5879.3 16600.0 64.94 330.21 5900.4 16650.0 64.70 330.06 5921.6 16700.0 63.18 329.50 5943.6 16750.0 61.93 329.21 5966.6 14278.3 14323.6 14368.8 14413.7 14458.0 1.55 14281.2 333.8 .75 14326.5 333.8 .55 14371.6 333.8 3.20 14416.4 333.8 2.55 14460.7 333.7 12812.30 N 12851.70 N 12890.94 N 12929.75 N 12967.93 N 6308.49 W 6330.96 W 6353.49 W 6376.09 W 6398.71 W 16800.0 60.47 329.38 5990.7 16850.0 59.51 329.53 6015.7 16900.0 58.93 330.03 6041.3 16950.0 58.60 331.96 6067.3 17000.0 57.94 333.66 6093.5 14501.7 14544.9 14587.8 14630.6 14673.1 2.95 14504.3 333.7 1.93 14547.5 333.7 1.43 14590.4 333.7 3.36 14633.1 333.7 3.19 14675.6 333.7 13005.60 N 13042.89 N 13080.01 N 13117.39 N 13155.22 N 6421.08 W 6443.08 W 646 6485.44 W 6504.87 W A Gyroda t a D i re c t i ona i Survey ~.P. EXPLORATION PAD, WELL NO. MPF-42i 4ILNE POINT FIELD, ALASKA Iob Number: A0397GCE388 4EASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. 17050.0 57.26 333.83 6120.3 k7100.0 55.51 334.39 6148.0 [7150.0 55.12 333.88 6176.5 [7200.0 53.77 333.50 6205.5 [7250.0 53.16 333.55 6235.3 k7300.0 51.48 333.87 6265.9 17350 . 0 50 . 59 333 . 65 6297 . 3 17400 . 0 48 . 63 333 . 00 6329 . 7 17450 . 0 47 . 51 332 . 96 6363 . 1 17500.0 45.94 333.11 6397.4 17550.0 44.83 333.31 6432.5 17600.0 43.47 332.73 6468.4 17650.0 41.64 332.85 6505.2 17750.0 38.35 334.22 6581.6 17800.0 37.47 333.99 6621.0 17850.0 34.93 333.68 6661.3 17900.0 34.04 333.14 6702.6 17950.0 33.69 332.74 6744.1 18000.0 33.17 332.78 6785.8 18050.0 32.12 335.30 6827.9 18100.0 31.65 335.15 6870.4 18150.0 31.32 335.31 6913.0 18200.0 30.98 335.32 6955.8 18250.0 30.55 335.29 6998.8 HORIZONTAL COORDINATES feet 14715.3 1.39 14717.8 333.7 13193.08 N 14756.9 3.64 14759.5 333.7 13230.54 N 14798.0 1.14 14800.6 333.7 13267.54 N 14838.7 2.78 14841.2 333.7 13304.00 N 14878.9 1.23 14881.4 333.7 13339.96 N 14918.4 3.40 14921.0 333.7 13375.44 N 14957.3 1.82 14959.9 333.7 13410.31 N 14995.4 4.04 14997.9 333.7 13444.33 N 15032.6 2.24 15035.1 333.7 13477.47 N 15069.0 3.16 15071.5 333.7 13509.92 N 15104.6 2.24 15107.1 333.7 13541.68 N 15139.4 2.83 15141.9 333.7 13572.72 N 15173.2 3.66 15175.8 333.7 13602.79 N 15237.8 4.27 15240.3 333.7 13660.60 N 15268.5 1.78 15271.0 333.7 13688.24 N 15298.0 5.09 15300.6 333.7 13714.74 N 15326.3 1.89 15328.9 333.7 13740.06 N 15354.2 .83 15356.7 333.7 13764.88 N 15381.7 1.05 15384.3 333.7 13789.37 N Page 15408.7 3.44 15411.3 333.7 13813.61 N 15435.1 .95 15437.7 333.7 13837.59 N 15461.1 .67 15463.8 333.7 13861.30 N 15487.0 .70 15489.6 333.7 13884.80 N 15512.5 .84 15515.2 333.7 13908.04 N 6523.54 W 6541.73 W 6559.66 W 6577.69 W 6595.61 W 6613.13 W 6630.32 W 6647.41 W 6664.32 W 6680.83 W 6696.87 W 6712.67 W 6728.13 W0.0 . 6756.88 W 6770.30 W 6783.32 W 6795.99 W 6808.66 W 6821.27 W 6833.08 W 6844.15 W 6855.09 W 6865.89 W 6876.58 W 14 40.45 A Gyroda t a D i r e c t i ona i Survey B.P. EXPLORATION F PAD, WELL NO. MPF-42i MILNE POINT FIELD, ALASKA Job Number: A0397GCE388 MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. 18300.0 30.35 335.22 7041.9 18350.0 30.19 335.16 7085.0 18400.0 29.85 334.69 7128.3 18450.0 29.91 334.53 7171.7 18500.0 29.37 334.55 7215.1 18512.0 29.16 334.60 7225.6 15537.8 .43 15540.5 333.7 15563.0 .32 15565.7 333.7 15588.0 .83 15590.7 333.7 15612.9 .20 15615.6 333.7 15637.6 1.09 15640.3 333.7 15643.5 1.75 15646.2 333.7 Final Station Closure: Distance: 15646.21 ft Az: 333.70 deg. Page HORIZONTAL COORDINATES feet 13931.05 N 13953.93 N 13976.59 N 13999.09 N 14021.41 N 14026.71 N 6887.18 W 6897.76 W 6908.36 W 6919.04 W 6929.67 W 6932.19 W 15 A Gyroda t a D i re c t i ona i Survey for B.P. EXPLORATION F PAD, WELL NO. MPF-42i MILNE POINT FIELD, ALASKA Job Number: SUB3880 Run Date: 28-Mar-97 11:30:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.505000 deg. N Sub-sea Correction from Vertical Reference: 41.5 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 332.630 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyroda t a D i re c t i ona i Survey ~.P. EXPLORATION ~ PAD, WELL NO. MPF-42i ~ILNE POINT FIELD, ALASKA rob Number: SUB3880 Page SUBSEA DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet -41 100 200 300 400 .5 .0 .0 .0 .0 0.00 0.00 0.0 .04 327.61 141.5 .11 353.96 241.5 .74 341.86 341.5 2.12 329.04 441.5 0.0 0.00 0.0 0.0 .1 .04 .1 314.9 .2 .08 .3 332.9 .9 .67 1.8 339.7 3.4 1.38 5.7 332.1 0.0 N 0.0 E .0 N .0 W .2 N .1 W .8 N .4 W 3.0 N 1.6 W 500 600 700 8OO 900 .0 .0 .0 .0 .0 3.23 330.12 541.5 4 . 74 330 · 82 641 . 5 6.71 330 · 61 741.5 8 · 22 332 · 75 841.5 10.43 336.00 941.5 8.1 1.11 11.5 330.5 15.0 1.53 20.0 330.5 25.1 1.96 31.9 330.5 38.2 1.52 46.5 330.9 54.5 2.27 64.7 332.0 7.0 N 4.0 W 13.1 N 7.4 W 21.8 N 12.3 W 33.4 N 18.5 W 48.2 N 25.5 W 1000 1100 1200 1300 1400 .0 .0 .0 .0 .0 13.57 339.18 1041.5 15.93 339.92 1141.5 17.73 339.44 1241.5 19.99 337.75 1341.5 21.77 335.81 1441.5 75.7 3.12 88.2 333.7 101.8 2.28 115.5 335.2 131.9 1.73 146.1 336.2 165.8 2.25 179.5 336.7 203.8 1.73 216.3 336.7 67.9 N 33.4 W 92.6 N 42.6 W 121.0 N 53.1 W 152.7 N 65.6 W 187.8 N 80.7 W 1500 1600 1700 1800 1900 .0 .0 .0 .0 .0 23 . 99 333 . 94 1541 . 5 26.39 333.26 1641.5 28.15 332.60 1741.5 29.70 332.12 1841.5 32 . 61 332 . 17 1941 . 5 245.9 2.22 255.9 336.4 292.6 2.23 299.0 336.0 344.2 1.42 345.1 335.5 399.4 1.49 418.1 335.1 459.9 2.47 470.8 334.7 225.8 N 98.6 W 267.7 N 119.3 W 313.7 N 142.8 W 362.5 N 168.5 W 416.0 N 196.7 W 2000.0 2100.0 2200.0 2300.0 2400.0 36.23 332.73 2041.5 39.21 333.83 2141.5 42.94 334.18 2241.5 47.06 334.08 2341.5 51.20 333.98 2441.5 528.3 2.74 557.7 334.4 606.0 2.12 620.1 334.3 693.1 2.69 720.4 334.2 793.1 2.91 828.7 334.2 908.6 2.38 944.3 334.2 476.6 N 228.5 W 546.1 N 263.3 W 624.4 N 301.4 W 714.4 N 345.2 W 818.2 N 395.8 W A Gyroda t a D i re c t i ona i Survey B.P. EXPLORATION F PAD, WELL NO. MPF-42i MILNE POINT FIELD, ALASKA Job Number: SUB3880 Page SUBSEA DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 2500 2600 2700 2800 2900 .0 .0 .0 .0 .0 55.40 333.90 2541.5 61.06 333.94 2641.5 64.30 334.70 2741.5 72.59 333.73 2841.5 77.24 332.56 2941.5 1043.6 1204.5 1398.8 1653.7 2050.0 2.17 1066.2 334.2 3.22 1237.7 334.1 2.24 1416.2 334.2 2.38 1697.0 334.2 · 52 2085.4 333.9 939.6 N 455.1 W 1084.1 N 525.9 W 1259.5 N 609.7 W 1489.0 N 720.8 W 1841.9 N 901.0 W 3000 3100 3200 3300 3400 .0 .0 .0 .0 .0 77.51 332.64 3041.5 77.44 332.69 141.5 76.58 333.65 3241.5 75.75 333.49 3341.5 75.78 332.98 3441.5 2534.3 2971.1 3407.3 3797.9 4188.4 2.83 2574.9 333.6 .59 3013.5 333.5 · 28 3451.9 333.5 · 40 3839.3 333.5 .20 4226.8 333.5 2270.8 N 1126.0 W 2659.5 N 1325.3 W 3049.4 N 1521.2 W 3399.3 N 1694.7 W 3747.8 N 1871.0 W 3500 3600 3700 3800 3900 .0 .0 .0 .0 .0 77.52 333.94 3541.5 77.69 334.13 3641.5 76.08 334.01 3741.5 74.96 335.71 3841.5 73.84 335.98 3941.5 4627.9 5084.3 5520.1 5900.3 6237.6 .53 4665.8 333.5 .23 5105.3 333.5 .36 5543.7 333.6 .43 5930.3 333.6 .27 6265.5 333.8 4140.8 N 2067.9 W 4551.4 N 2267.5 W 4943.4 N 2458.0 W 5287.7 N 2620.0 W 5595.9 N 2758.4 W 40OO 4100 4200 4300 4400 .0 .0 .0 .0 .0 77.86 335.67 4041.5 76.41 333.72 4141.5 76.99 333.25 4241.5 76.75 333.08 4341.5 76.79 332.92 4441.5 6639.3 7087.0 7506.6 7926.0 8348.5 .92 6653.8 333.9 .67 7092.9 333.9 .78 7530.6 333.9 .50 7968.3 333.9 .31 8357.5 333.8 5962.7 N 2923.7 W 6367.2 N 3116.2 W 6742.6 N 3303.6 W 7116.8 N 3493.1 W 7493.8 N 3683.9 W 4500 4600 4700 4800 4900 .0 .0 .0 .0 .0 76.28 332.10 4541.5 76.11 334.07 4641.5 78.11 334.97 4741.5 77.19 334.83 4841.5 76.26 333.88 4941.5 8779.4 9183.0 9628.6 10104.4 10526.3 · 23 8795.8 333.8 · 77 9232.3 333.7 .78 9671.7 333.7 .29 10111.9 333.8 · 96 10549.7 333.8 7876.8 N 3881.2 W 8233.7 N 4069.8 W 8635.2 N 4263.4 W 9067.5 N 4463.4 W 9447.3 N 4647.3 W A Gyroda t a D i r e c t i ona i Survey ~.P. EXPLORATION PAD, WELL NO. MPF-42i 4ILNE POINT FIELD, ALASKA Iob Number: SUB3880 Page SUBSEA DEPTH feet IN C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE HORIZONTAL COORDINATES SEVERITY DIST. AZIMUTH deg./ feet deg. feet 100 ft. 5000.0 75.20 333.28 5041.5 5100.0 75.82 334.40 5141.5 5200.0 75.55 333.70 5241.5 5300.0 77.67 334.99 5341.5 5400.0 77.07 334.06 5441.5 10922.0 1.15 10937.4 333.8 9801.7 N 4823.7 W 11317.5 1.07 11325.2 333.8 10157.5 N 4996.7 W 11742 7 58 11763 I ~ . . · . . ~.8 10540 9 N 5180 6 W 12155.3 2.41 12200.7 333.8 10913.3 N 5358.9 W 12597.6 .56 12639.5 333.9 11312.7 N 5549.5 W 5500.0 76.86 333.89 5541.5 5600.0 78.14 333.87 5641.5 5700.0 75.49 332.71 5741.5 5800.0 66.96 330.45 5841.5 5900.0 63.32 329.56 5941.5 13014.6 .61 13028.4 333.9 11686.7 N 5734.2 W 13462.1 .65 13467.6 333.9 12089.9 N 5928.7 W 13886.2 .44 13905.4 333.9 12469.0 N 6118.8 W 14193.1 3.51 14235.7 333.8 12738.1 N 6266.5 W 14409.4 2.94 14416.4 333.8 12926.0 N 6373.9 W 6000.0 58.93 330.04 6041.5 6100.0 55.92 334.26 6141.5 6200.0 52.82 333.61 6241.5 6300.0 48.24 332.98 6341.5 6400.0 44.49 333.16 6441.5 14588.1 1.45 14633.1 333.7 13080.3 N 6464.8 W 14747.1 3.11 14759.5 333.7 13221.7 N 6537.4 W 14886.9 1.67 14921.0 333.7 13347.2 N 6599.2 W 15008.5 3.40 15035.1 333.7 13456.0 N 6653.4 W 15113.3 2.39 15141.9 333.7 13549.5 N 6700.8 W 6500.0 40.49 333.57 6541.5 6600.0 36.18 333.83 6641.5 6700.0 33.71 332.77 6741.5 6800.0 31.97 335.25 6841.5 6900.0 31.09 335.32 6941.5 15204.8 2.62 15208.6 333.7 13631.0 N 6742.4 W 15283.5 3.46 15300.6 333.7 13701.7 N 6776.9 W 15352.4 .90 15356.7 333.7 13763.3 N 6807.9 W 15417.1 2.64 15437.7 333.7 13821.3 N 6836.6 W 15478.4 .69 15489.6 333.7 13877.0 N 6862.3 W 7000.0 30.35 335.22 7041.5 7184.1 29.16 334.60 7225.6 15537.6 .43 15540.5 333.7 13930.9 N 6887.1 W 15643.5 1.75 15646.2 333.7 14026.7 N 6932.2 W Final Station Closure: Distance: 15646.21 ft Az: 333.70 deg. 4. QUALITY CONTROL QUALITY CONTROL REPORT JOB NUMBER: A0397GCE388 TOOL NUMBER: 758 MAXIMUM GYRO TEMPERATURE: 82.2 C MAXIMUM AMBIENT TEMPERATURE: 82.1 C MAXIMUM INCLINATION: 79.1 AVERAGE AZIMUTH: 333.7 WIRELINE REZERO VALUE: N/A REZERO ERROR / K: N/A CALIBRATION USED FOR FIELD SURVEY: 1857 CALIBRATION USED FOR FINAL SURVEY: 1857 PRE JOB MASS BALANCE OFFSET CHECK: -.20 POST JOB MASS BALANCE OFFSET CHECK~: USED O.O/iV/A CONTINUOUS CONDITION OF SHOCK WATCHES .50 UPON ARRIVAL AT RIG: OK UPON COMPLETION OF SURVEY: OFF UPON RETURN TO ATLAS OFF BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH TVD NORTHING EASTING MWD 18504 29.31 333.71 7211.56 13914.6 7197.9 FINAL SURVEY 18512 29.16 334.55 7225.60 14027 6932 FUNCTION TEST JOB NUMBER: A0397GCE388 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 18512 29.04 29.04 29.04 29.04 29.04 AZIMUTH M.D. ft 1 2 3 4 5 18512 334.87 334.85 334.86 334.64 334.60 5. EQUIPMENT AND CHRONOLOGICAL REPORT EQUIPMENT REPORT JOB NUMBER: A0397GCE388 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 758 GYRO SECTION DATA SECTION POWER SECTION BACKUP TOOL No. 768 GYRO SECTION DATA SECTION POWER SECTION A0147 C0100 C0040 A0159 C0089 C0086 COMPUTER A0222 POWER SUPPLY PRINTER A0079 INTERFACE A0087 COMPUTER A0349 POWER SUPPLY PRINTER A0029 INTERFACE A0055 A0085 A0107 WIRELINE COMPANY: CABLE SIZE: 5/16" ATLAS RUNNING GEAR 2.5" HOUSING W/ROLLERS TOP AND BOTTOM TOTAL LENGTH OF TOOL :25' MAXIMUM O.D.: 4.5 INCHES TOTAL WEIGHT OF TOOL: 350 POUNDS CHRONOLOGICAL REPORT JOB NUMBER: A0397GCE388 THURSDAY, 03/20/97-TO SLOPE FOR MPF-42I AND S PAD. 17:00- S PAD CANCELLED. FRIDAY, 03/21/97- STANDBY-CHECK TOOLS, O.K.- SATURDAY, 03/22/97- STANDBY- CHECK TOOLS O.K.- SUNDAY, 03/23/97 06:45 08:30 10:45 11:15 11:30 16:30 21:15 22:00 23:00 TO LOCATION ARRIVE LOCATION MU TOOL, RU ATLAS PU TOOL START INRUN SURVEY SURVEY CONTINUOUS TO 18512' OUTRUN CONTINUOUS W/GR/CCL RIG DOWN RTN TO ATLAS MONDAY, 03/24/97 09:30 PROCESS SURVEY/CHECK TOOL 12:30 RETURN TO MILNE POINT FIELD WITH RESULTS. 15:00 RETURN TO ATLAS. SUMMARY OF DAILY OPERATIONS SHARED SERVICES DRILLING- BPX/ARCO Well Name: MPF-42i Rig Name: N-4ES AFE# 339058 Accept Date: 09/16/97 Spud Date: . Release Date: 09/23/97 SEPTEMBER 16, 1997 ACCEPT RIG @ 1800 HRS ON 09/15/97. RIG UP BERM LEVEL, SAFE OUT EQUIPMENT (ROAD BLOCKED DUE TO PEAK EQUIPMENT RAN OFF ROAD BETWEEN L & F PAD) RIG LINES TO TREE & PULL BPV W/LUB. OPEN WELL 90 PSI TBG BLEED TO TANK & PACK TBG W/9 BBL 10.5 PPG BRINE & MONITOR SET TWC. ND TREE & NU BOP'S TEST BOP EQUIPMENT TO 250 LOW & 5000 HIGH (NO RETURN CALL FROM AOGCC). SEPTEMBER 17, 1997 CONT BOP TEST 250 LOW, 5000 HIGH LD TST JT & PULL TWC. MU FTA #1 & RIH ON 2 7/8" PIPE FROM SHED TO 6045' & SET DN 4K & ROTATE 3 RDS PU 5K OVER PU WT. POOH (NO RECOVERY) RIH W/FTA #1 RUN #2 SET DN @ 6088' ROTATE 3 RDS & PU W/7K OVER PU WT. POOH W/FTA #1 RUN #2. LOST 241 BBL OF BRINE & LOWERING FILL WT TO 9.9 PPG. SEPTEMBER 18, 1997 LUB RIG. CUT BACK BRINE W-I' FROM 10.4# TO 9.9# PUMP LCM PILL DOWN ANNULUS. TOOH W/FTA #1 RECOVERED 18.5 FT OF E-LINE. TIH W/FTA #1 TRIP #2. TAG FISH @ 6088' WORK TOOLS. TOOH W/FTA #1 TRIP #3 RECOVERED 15 FT OF E-LINE. START TIH W/FTA #1 TRIP #4. CONT TIH SLIP 42' DRILLING LINES FINISH TIH W/FTA #1 TRIP #3 TAG FISH @ 6088' WORK TOOLS. TOOH FTA PLUGGED UP PULLED WE STRING LD SPEAR (BENT) FOUND LCM IN FTA NO E- LINE RECOVERY. PU BOWEN 3 1/8" x 2 1/8" OVERSHOT. SEPTEMBER 19, 1997 FINISH MU FTA #2 TRIP #5 TIH W/2 7/8" DP FOUND TOP OF FISH @ 5141' SET OS, TOOH W/FTA #2, HAVE TOP OF FISH @ SURFACE. RECOVERED GS BYD DISCONNECT WIRE GRAB & BALL OF E-LINE ALSO HAVE UNKNOWN LENGTH OF E-LINE HANGING IN HOLE. RU HWLS & ATLAS TO SPOOL REMAINING E-LINE. STRING E-LINE TO HWLS UNIT. POOH W/E-LINE RECOVERED 10,000FT +/-. E- LINE PULLED FROM CABLE HEAD RD HWLS & ATLAS. MU FTA #3 LOAD 2 3/8" PH-6 DP IN PIPE SHED. START PU 2 3/8" DP & RIH W/FTA #3 TRIP #6 TAGGED NEXT FISH @ 5460' SET DOWN STRING WT. PU 5K OVER ATTEMPTED TO GET DEEPER. STACKED OUT AGAIN @ 5499' START TOOH W/FTA #3, DP & FISH. SEPTEMBER 20, 1997 LUB RIG. FINISH TOOH W/FTA #3, NO FISH. WO HWLS. RU HWLS. RIH W/LUB SET DOWN @ 6058' WLM POOH HAVE PICTURE OF A PIECE OF SPEAR GRAPPLE. RIH W/3.5" MAGNET TO 6230' POOH RECOVER 2 SMALL PIECES OF GRAPPLE RIH AGAIN W/MAGNET TO 12000' POOH RECOVER 1 LARGE PIECE OF Page 1 of 2 SUMMARY OF DALLY OPERATIONS GRAPPIC. RIH AGAIN W/MAGNET TO 12500' LOCATED A 3 5/8" REVERSE JUNK BASKET. POOH W/MAGNET. NO RECOVERY. RD HWLS. MU FTA #4 3 5/8" REVERSING JUNK BASKET. START RIH PICKING UP 2 3/8' DP FROM PIPE RACK MU JARS & DC'S CONTINUE IN HOLE W/2 7/8" DP FROM DERRICK. CONTINUE IN HOLE PICKING UP 2 7/8" DP FROM PIPE RACK. STOPPED @ 12485' & WASH DOWN TO 12547' LAST WT RUN WAS FROM 12500' CONT PU 2 7/8" DP FROM PIPE RACK. LOOKING FOR TOP OF NEXT FISH. SEPTEMBER 21, 1997 CONT IN HOLE PICKING UP 2 7/8" DP STOP & WASH DOWN @ 14746' & AGAIN @ 15969' CONT PUSHING ROLLER STEM/CULTER BAR FISH DOWN HOLE. BUMP INTO NEXT FISH LOG IN TOOL STRING @ 17544'. START TOOH W/DP & FTA #4. FINISH TOOH. MU FTA #5, START TIH W/2 3/8" & 2 7/8" DP. CUT & SLIP DRILLING LINE. FINISH TIH, PUW = 95K SOW = 28K. TAG FISH @ 17656' SET DOWN 10K TO PLANT OS PU & PULL FISH FREE W/15K OVER. START TOOH W/FTA #5, DP & FISH. SEPTEMBER 22, 1997 LUB RIG. FINISH TOOH W/DP, FTA #5 RECOVERED LAST FISH (LOGGIN TOOLS) LD FISHING TOOLS LD LOGGING TOOLS. MU BHA #1 (3.625 MILL) START TIH TO DRIFT TUBING. TIH W/DRILL PIPE. STOP @ 17440 BULLHEAD 20 BBLS FLUSH TUBING TO TAILPIPE PUW = 98K SOW = 28K. CONT TIH DRIFT TIGHT SPOT @ 17591' W/3.625" MILL. 5K DOWN 2K UP. MAKE SEVERAL PASSES NO CHANGE CONT IN HOLE THRU PACKER @ TT. TAG SOFT FILL @ 18470' (BTM PERF IS @ 18465'). START TOOH, LD DRILL PIPE NO TROUBLE THRU TT & PKR SAME OVER PULL THRU TIGHT SPOT @ 17591 CONT TOOH. SEPTEMBER 23, 1997 TOOH, LD DRILL PIPE. FINISH LD DP, RIG DOWN FLOOR, SET TWC. ND BOP'S NU TREE TEST TUBING HANGER & TREE TO 5000 PSI GOOD TEST PULL TWC & INSTALL BPV. HOOK UP & TEST LINE BULLHEAD DIESEL DOWN TUBING TO FREEZE PROTECT RIG DOWN LINES & CELLAR. SECURE WELL. RIG RELEASED @ O6OO HRS. Page 2 of 2 STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: Test: Initial X Workover: X Nabors Rig No. 4ES PTD # 97-0020 BPX Rep.: MPU F421 Set @ Weekly Other DATE: 1/31/97 Rig Ph.# 659-4154 Jessie New Rig Rep.: Paul Smith Location: Sec. 6 T. 13N R. IOE Meddian UM MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) PTD On Location YES Standing Order Posted YES Well Sign N/A Drl. Rig OK Hazard Sec. YES FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Test Quan. Pressure P/F I 250/5,000 P I 250/5,000 P I 250/5,000 P BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. 250/3000 250/5,000 f 250/5,000 I 250/5,000 2 250/5,000 I 250/5,000 N/A NIA P/F F CHOKE MANIFOLD: P No. Valves No. Flanges p Manual Chokes p Hydraulic Chokes P P N/A Test Pressure P/F 11 250/5, 000 P 22 250/5,000 P Func~oned Functioned ACCUMULATOR SYSTEM: System Pressure Pressure After Closure MUD SYSTEM: Visual Alarm 200 psi Attained After Closure minutes 26 sec. Trip Tank OK OK System Pressure Attained 2 minutes g sec. Pit Level Indicators OK OK Blind Switch Covers: Master: OK Remote: OK Flow Indicator OK OK Nitgn. Btl's: 4 ~ 2100 Psi Meth Gas Detector OK OK Psig. H2S Gas Detector OK OK 3000 1800 Number of Failures: 1 ,Test Time: 3.0 Hours. Number of valves tested f8 Repair or Replacement of Failed Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: The AnnularPreventer failed to test, the element was changed out and tested by toolpusher Paul Smith Distribution: orig-Well File c - Oper./Rig c- Database c - Tdp Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: W'rtnessed By: Chuck Scheve FI-021L (Rev.12/94) AWPKDHEE.XLS MEMORANDUM TO: THRU: David Jo~ Chairmah~..~r Blair Wondzell, P. I. Supervisor State of Alaska Alaska Oil and Gas Conservation Commission DATE: April 8, 1997 FILE NO: awpkdhee.doc FROM: Chuck Scheve, c. 5 SUBJECT: Petroleum Inspector BOPE Test Nabors 4ES MPU F-42i PTD # 97-20 Monday April 8, 1997: I traveled to BPX's MPU F-42i Well being worked over by Nabors Rig 4ES and witnessed the initial BOPE test on this well. As the attached AOGCC BOPE test report shows the test lasted 3 hours with one failure. The Annular Preventer failed to pressure test. The element was changed out and retested by Nabors toolpusher Paul Smith after I departed location. The testing went well with good test procedures being employed by the Nabors crews. The rig was clean and all related equipment appeared to be in good working order. The location though crowded was well organized. Summary: i witnessed the initial BOPE test on Nabors Rig 4ES completing Well MPU F-42i Nabors 4ES, 4/8197, Test time 3 hours, 1 failure Attachment: awpkdhee.xls X Unclassified Confidential (Unclassified if doc. removed ) Confidential MEMORANDUM TO: THRU: David Jo~~ Chairman Blair Wondzell, P. I. Supervisor State of Alaska Alaska Oil and Gas Conservation Commission DATE: February 6, 1997 FILE NO: ewolbfed.doc FROM: John Spauiding,~,,, SUBJECT: Petroleum Insp. Diverter Function Test Nabors 22E BPX / MPU / MPF-42i PTD 97-20 Thursday February 6, 1997: i witnessed the BOPE Test on Nabors 22E at BPX's Milne Point Unit well MPF-42i. The AOGCC Diverter Function Test Report is attached for reference. The accumulator system did not pressure up in a timely fashion, I requested thet the system be repaired prior to spudding the well. Charlie Dixon BPX Co. Rep. called me 3 hours and informed me that repairs had been made and the pressure up time was reduced by almost half. All other portions of the system worked well with the terminus of the vent line being down wind and being well marked. Summary; i witnessed the successful diverter function test on Nabors 22E, 1 non-compliance item. Attachments: ewo91efd.xlt X Unclassified Confidential (Unclassified if document removed) Confidential Drlg Contractor: Operator: Well Name: Location: Sec. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Diverter Systems Inspection Report Nabors BPX MPF-42i Operation: Rig No. Development 22E PTD # Date: X Exploratory: 97-20 Rig Ph. # Charlie Dixon 13N R. Oper. Rep.: Rig Rep.: 10E 2/6/97 659-4644 Rodney Klepsig Merdian Umiat TEST DATA MISC. INSPECTIONS: Location Gen.: ok Housekeeping: ok Reserve Pit: n/a (Gen.) DIVERTER SYSTEM INSPECTION: Diverter Size: Divert Valve(s) Full Opening: Valve(s) Auto & Simultaneous: Vent Line(s) Size: Vent Line(s) Length: Line(s) Bifurcated: Line(s) Down Wind: Line(s) Anchored: Turns Targeted / Long Radius: Well Sign: Drlg. Rig: Flare Pit: ok ok n/a 20 in. yes yes 12 ,, in. 90 - ft. yes - yes yes N/A ACCUMULATOR SYSTEM: Systems Pressure: Pressure After Closure: 200 psi Attained After Closure: Systems Pressure Attained: Nitrogen Bottles: 3,000 1,650 min. 51 4 min. 11 8 @ 1900 avg. MUD SYSTEM INSPECTION: Trip Tank: Mud Pits: Flow Monitor: GAS DETECTORS: Methane Hydrogen Sulfide: Light Alarm ok ok ok ok ok ok Light Alarm ok ok ok ok psig psig sec. SeC. psig DIVERTER SCHEMATIC Camp 12" knife valve / 20" diverter A full open valve (closed) full open valve (open) North Wind Direction Non Compliance Items 1 Repair Items Within I Day (s) And contact the Inspector @ 659-3607 Remarks: Slow accumulator system times; leaking valve located on the remote control panel Distribution orig. - Well File c - OpeflRep c- Database c - Trip Rpt File c - Inspector AOGCC REP.: OPERATOR REP.: EWOLBFED.XLS John H. Spaulding Charlie Dixon DVTRINSP.XLT (REV. 1/94) TONY KNOWLE$, GOVERNOR ALAS K ~ OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 February 1, 1997 Tim Schoficld Senior Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re; Milne Point Unit MPF-42i BP Exploration (Alaska) Inc. Permit No. 97-20 Stir. Loc 2019'NSL, 2715'WEL, Sec. 6, T13N, R10E, UM Btmholc Loc. 278'NSL, 4860'WEL, Sec. 24, TI4N. R9E, UM Dear Mr. Schofietd: Enclosed is thc approved application for permit to drill file above referenced well. The permit to drill does not exempt you from obtaining additional permits required bv laxv from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the mechanical integrit?' (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 25.030(g)(3). Sufficient notice (approximately 24 hours) of the' MI test before operation, and of the BOPE test performed before drilling below thc surface casing shoe, must be given so that a representative of the Commission mav witness thc tests. Notice ma.,,' bc given bx' contacting thc Commission petroleum field inspector on thc North Slope pager at 659-3607. Chairman -NN.~~ BY ORDER OF THE COMMISSION dlf/Enclosurc / CC; Department of Fish & Game, Habitat Section w/o cncl. Department of Environmental Conservation w/o cncl. STATE OF ALASKA ALASKA O;L AND GAS CONSERVATION CO~v~MISSION PERMIT TO DRILL la. Type ofwork [] [] [] Re-Entry E] Dee perator Exploration (Alaska) Inc. 2O AAC 25.OO5 1 b. Type of well [] []Service [] Development Gas P.O. Box 196612, Anchorage, Alaska 99519-6612 Location of well at surface 2019' NSL, 2715' WEL, SEC. 6, T13N, R10E At top of productive interval 111' NSL, 4773' WEL, SEC. 24, T14N, R9E At total depth 278' NSL, 4860' WEL, SEC. 24, T14N, RgE to nearest property nee to nearest we 278' No pproach completed for deviated wells 300' Casing Program Size Plan RTE = 41.5' 6. Property Designation ADL 355021 7. Unit or Property Name Milne Point Unit Well Number MPF-42i s O2/O3/97 er of acres in propert' 5120 ~pment OJ Zone [] Multiple Zone and Pool Milne Point Unit / Kuparuk River Sands Bond (See 20 AAC 25.025) Number 2S100302630_277 Amount $200,000.00 Specifications 76.54 and TVD) 18912' Mb / 7547' TVD pressure {see 20 ,&AC 25.035 (e) (2)} Maximum surface 2860 psig, At total depth (TVD) 7180' / 3584 psig Setting Depth Bottom Quar of Cement stage data) 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present wel~ condition summary Total depth: measured feet true vertical feet Effective depth: measured feet true vertical feet Casing Structural Conductor Surface intermediate Production Liner Length Size Plugs (measured) Junk (measured) Cemented MD TVD ORIGINAL RECEIVED Permit Number -'-~ 50- Conditions of Approval: Samples Required E3 Yes .1~ No Hydrogen Sulfide Measures E3Yes ,1~ No Required Working Pressure for BOPE I~ 2M; Other: By Form 10-401 Rev. 12-01-85 ~ Title Senior Drilling Engineer Date I Commission Use Only er ~ver letter ~ f~ther requirements Mud Log Required E3 Yes ~ No Directional Survey Required .J~ Yes ~ No ~3M; .~ 5M; I~10M; E3 15M by order of Commissioner the co__remission Date Subm )licate Perforation depth: measured true vertical Alaska Oil & Gas Cons. Commission Anchorage ~ments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Eng/neer Name/Number: James Robertson, 564-5159 Prepared By Name/Number: Kathy Campoamor, 564-5122 21. I hereby certify that the Signed ~rrect to the best of my knowledge Shared Services Drilling Contact: I Well Name: James E. Robertson IMP F-42i I Well Plan Summary 564-5159 IType of Well (producer or injector): IKUPARUK INJECTOR ISurface Location' Target Location- Bottom Hole Location' 2019 NSL 2715 WEL Sec 06 T13N R10E UM., AK 111 NSL 4773 WEL Sec 24 T14N R09E UM., AK 278 NSL 4860 WEL Sec 24 T14N R09E UM., AK I AFE Number: I 337060 Estimated Start Date: IMD: 118,912' I IWell Design: I 3FEB97 I Rig: I Nabors22-E Operating days to complete: I 24 I TVD: 17,S47' bkb I IKBE: I41'5' I Longstdng Milne Point Ultra Slimhole Longstring 9-5/8", 40~ Surface X 7", 26~ Formation Markers: Formation Tops MD TVD (bkb) base permafrost 1,861 1,791 NA 8,950 3,981 Top of Schrader Bluff Sands (8.3 ppg) Seabee Shale 10,566 4,441 Base of Schrader Bluff Sands (8.3 ppg) HRZ 18,102 6,845 High Resistivity Zone MK-19 17,887 7,111 Top Kuparuk 18,378 7,085 Kuparuk Cap Rock Target Sand -Target 18,536 7,221 Target Sand (9.6 ppg) Total Depth 18,912 7,547 Casing/Tulc ing Program: Hole Size Csg) Wt/Ft Grade Conn Length Top Btm Tbg O.D. MDITVD MDITVD 24" 20" 91.1# H-40 Weld 80 32/32 112/112 12 1/4" 9-5/8" 40~ L-80 btrc 10685 31/31 10716/4476 8-1/2" 7" 26# L-80 btrc- 18468 30/30 18912/7547 mod Intemal yield pressure of the 7" 26/~ casing is 7240 psi. Worst case surface pressure would occur with a full column of gas to the reservoir at _+7180 -rVDSS. Maximum anticipated surface pressure in this case assuming a reservoir pressure of 3584 psi (9.6 ppg EMW) is 2866 psi, well below the internal yield pressure rating of the 7" casing. Logging Program: Open Hole Logs: Surface MWD Directional surface to TD. LWD Gamma Ray surface to TD Intermediate N/A Final MWD Directional and LWD (GPJRES). Down Hole WOB and Torque Cased Hole Logs: N/^ Mudloggers are NOT required for this well. Mud Program: I Special design considerations I None-SPUD MUD Surface Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.6 50 15 8 10 9 8 to to to to to to to 9.0 150 35 15 30 10 15 Intermediate Mud Properties: NIA I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Production Mud Properties: ] LSND freshwater mud to horizontal section Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.0 40 10 3 7 8.5 6-8 to to to to to to to 10.0 50 15 10 20 9.5 4-6 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: IK°P: 13°°' 176.540 IMaximum Hole Angle: Close Approach Well: Disposal: Cuffings Handling: Cuttings and ddlling waste fluids should be hauled to the ball mill at CC-2A. The Milne Point reserve pit can be opened in emergencies by notifying Karen Thomas (564-4305) with request. 1. The base of the Permafrost for all well~ located in the Milne Point Unit is _+1,800' TVD. Aquifers in the Milne Point Unit have been exempted from C~ss II injection activities by the AOGCC by Aquifer Exemption Order ~Y2 as referenced in Area Injection Order fiX10. There are no domestic or industrial use water wells located within one mile of the project area. ~ .~, ' ! ! .... 2. There are _28 wells on M~lne Pt. F Pad. Th~[e may be add~bonal un~denhfied wells within one quarter mile distance from the subject well. There are no d~estic or industrial water use wells located within one mile of the project area. ~, ,, 3. The wastes to be disposed of during drilling operab'~s can be defined as "DRILLING WASTES. , 4. The cement design for this well ensures that annular ~mping into hydrocarbon zones will not occur. ! . . 3. 4. 5. . . 11. 12. 13. 14. 15. MP F-42i Proposed Summary of Operations Ddll and Set 20" Conductor. Weld a starting head on conductor as well as a nipple to aid in performing potential wellhead stability cement job. Prepare location for rig move. MIRU Nabors 22E ddlling dg. NU and test 20" Diverter system. Build Spud Mud. Drill a 12-1/4" surface hole as per directional plan. Run Directional MWD and LWD GR from surface to TD. Run and cement 9-5/8" casing. ND 20" Diverter, NU and Test 13-5/8" BOP MU a PDC bit on a motor, with Directional MWD and LWD CDR/CDN (GPJRES/Dens/Neu) as well as Down Hole Weight on Bit and Down Hole Torque. RIH, Drill out Float Equipment and 20' of new formation. Perform LEAKOFF TEST. If LOT EMW is less than 12.5 ppg contact appropriate superintendent. Drill 8.5" hole to TD as per directional plan. Run and Cement 7", 26~, L-80, Buttress-Modified casing. Displace cement with completion fluid and enough diesel to cover from the base of conductor pipe at +/-80' md to surface. Test casing to 4000 psig. ND BOPE, NU and Test Tree. RDMO Nabors 22E drilling rig to drill next well. MIRU completion dg. NU & Test BOPE to 5000 psig. Complete well with 4-1/2" tubing. Install Surface Lines and Wellhouse and turn well over to production. DRILLING HAZARDS AND RISKS: Seethe updated Milne Point F-Pad Data Sheet prepared by Pete Van Dusen for information on F pad and review recent wells drilled on F Pad. Most of the trouble time on recent wells has been due to equipment mechanical problems with the surface equipment, rather than formation drilling problems. The MPU PE group MAY be perforating, hydraulic fracturing and cleaning out wells shortly after the rig drills and completes them. This will make the near dg area congested and as a result potentially hazardous. Ensure personnel use caution moving around adjacent production activities. Close Approach: MP F-46i will be shut-in while the MP F-42i surface hole is being drilled between 500' md to 1,200' md. Lost Circulation: There has not been any appreciable amount of lost circulation on any of the F Pad wellls to date. Stuck Pipe Potential: Well MPF-53 was stuck coming out on the short trip at surface casing point. Proir to this incident there was only minor indications that the gravel and coal were present. It appears that we dragged the gravel up into the bottom of the curve and reduced our ability to move up or down. Then we lost the ability to circulate when the hole collapsed. If significant gravels are encountered stop and raise funnel viscosity to 150 cp viscosity immediately. Formation Pressure: The maximum expected pore pressure for this well is 9.6 ppg EMW (3,604 psi @ 7,221' TVD). There has been no injection in this region, therefore the reservoir pressure should not exceed this estimate and it is likely the area is somewhat depleted. MP F-42i 9-518" SURFACE CASING CEMENT PROGRAM - HALLIBURTON CASING SIZE: 9-5/8" CIRC. TEMP 60 deg F at 2840' -I'VDSS. SPACER: 75 bbls spacer weighted to mudweight in the hole. STAGE1 LEAD: ADDITIVES: WEIGHT: APPROX #SACKS: TYPE 'E' PERMAFROST Retarder + CELLO-FLAKES (1/4 lb/sack) 12.0 ppg YIELD:2.17 ft3/sx MIX WATER: 11.63 gal/sk 1409 SACKS THICKENING TIME: Greater than 4 hrs at 50° F. ANUULAR VOLUME FROM 100 FEET TVD ABOVE SCHRADER BLUFF TO BASE OF PERMAFROST AT 1800' MD +30% EXCESS +ANNULAR VOLUME FROM 1800' MD TO STAGE COLLAR AT t300' MD +200% EXCESS. STAGE1 TAIL CEMENT TYPE: PREMIUM 'G' ADDITIVES: WEIGHT: AP P ROX ~SAC KS: FLUID LOSS: 0.2% CFR-3 + 0.20% HALAD-344 + CELLO-FLAKES 15.8 ppg YIELD:1.15 ft3/sx MIX WATER: 5.0 gal/sk 935 THICKENING TIME: Greater than 4 hrs at 50° F. 100-150 cc FREE WATER: 0 TAIL CEMENT FROM TD TO 1000 FEET MD ABOVE TOP of KUPARUK + 30% EXCESS + 80'md 9-5~8", 40~ capacity for float joints. STAGE2 LEAD: ADDITIVES: WEIGHT: APPROX #SACKS: TYPE 'E' PERMAFROST Retarder 12.0 ppg 563 SACKS YIELD:2.17 ft3/sx MIX WATER: 11.63 gal/sk THICKENING TIME: Greater than 4 hrs at 50° F. ANUULAR VOLUME FROM STAGE COLLAR AT 1300' MD TO SURFACE+ 200% EXCESS. WELLHEAD STABILITY CEMENT TYPE: Permafrost E NOTE: ADDITIVES: Retarder WELLHEAD STABILITY CEMENT WILL BE PUMPED IF THERE ARE NO CEMENT RETURNS TO SURFACE OR THE CEMENT TOP FALLS BELOW SURFACE AFTER THE PUMPS ARE SHUT DOWN. WEIGHT: 12.0 ppg YIELD:2.17 ft3/sx MIX WATER: 11.63 gal/sk APPROX NO SACKS: 150 RECIPROCATE CASING STRING WHILE CEMENTING IF POSSIBLE/PRACTICAL CENTRALIZER PLACEMENT: 1. 1 Bowspdng centralizer per joint of 9-5/8" casing on bottom 15 joints of casing (15 required). 2. Place all centralizers in middle of joints using stop collars. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacedmud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 - 15 bpm. Mix slurry on the fly - batch mixing is not necessary. MP F-42i Well 7" PRODUCTION CASING CEMENT PROGRAM- HALLIBURTON SINGLE STAGE CEMENT JOB ACROSS THE KUPARUK INTERVAL: CIRC. TEMP: SPACER: 140° F BHST 170° F at 7040' TVDSS. 20 bbls fresh water 70 bbls Alpha Spacer mixed as per Halliburton specifications weighted to 1.0 ppg above current mud weight. CEMENT TYPE: Premium G ADDITIVES: WEIGHT: 15.8ppg APPROX # SACKS: FLUID LOSS: 0.2% CFR-3, 0.1% HR-5, 0.4% Halad 344 YIELD: 1.15 cu ft/sk MIX WATER: 5.0 gal/sk 272 SACKS THICKENING TIME: 3 1/2 - 4 1/2 hrs @ 140° F < 50cc/30 min @ 140° FREE WATER: 0cc @ 45 degree angle. CENTRALIZER PLACEMENT: 1. 7" x 8-1/4" Straight Blade Rigid Centralizers. Two per joint on the bottom 26 joints of 7" casing (52). This will cover +_300' above the KUPARUK Sand. 2. Run two (2) 7" x 8-1/4" Straight Blade Rigid Centralizers on the second full joint inside the 9-5/8" casing shoe. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 8-'10 bpm. Batch mixing is not necessary. CEMENT VOLUME: 1. Single stage cement job is calculated to cover 1000 FT MD above the Kuparuk 'C' Sand with 30% excess. SHARED SERVICES DRILLING Anadr ~ ] ] S£h]umberger MPF-42 (PS) VERTICAL SECTION VIEW Section at: 33~.§~ IYD Scale.' a ~nch = 2000 fee[ Oep Scale.' ~ inch : 2000 feet Drawn · 24 Jan ~g97 A ,,, Marker Identification MD BKB 5btJlN 1NCL ~ :: . : A} KB 0 0 0 0.0 , ' B) KOP/BUILD 1/lO0 300 300 0 0.0 0 -- ~ ~ i C) BUILD t.5/100 400 400 I 1 0 E '-' ~ ' . i ~ D) BUILD 2/100 700 699 lB 5.~ i ~ E) BUILD 2.5/~00 1~00 ~094 84 13.~ F) END 2.5/100 BUILD 1832 1766 ~5 3~.~ .... ~ ..... ~~r -~,~ G ~ ' G) BUILD 2.5/t00 ~892 18~7 396 3~.~ H} END 2.5/100 BUILD 368~ 2838 ~BtO 76.~ ' ~ ~. ' : ..... I) 9'5/8" CASING POINT 10716 4476 8652 76.~ J) DROP 2.5/100 ~6240 5763 ~4024 76.[ ., ......'~ ~~- K) END ~.5/100 DROP ~B~02 68~6 J5475 30.[ L) 'TARGET IB536 7221 15692 30.( M) 7" CASING POINT IBgl2 7547 15BBO 30.( ~ ~ N) ID 18912 7547 15880 30.( - ' ' FOR STUDY ONLY ~ - ~- - _. .................. ~' ,, , ~' · [ . .............................. , ; . : J ' : . , , : , . . . , ~ . 0 lO00 2000 3000 4000 5000 6000 7000 BO00 9000 1000,3 11000 12000 13000 14000 15000 16000 17000 Section Departure (~nadrill [c)g7 MPF42P5 3.0C 1:;)4 ~ P] G I I 0 :3 1 m !00 feet · -]an-24-97 03 = 18P AnadY,i 'i'1 DPC '907 344 2160 SHARED SERV ICES DRILL ]: NG ' i i i i i i i i .) ~,.~, ,,~ ~, ~ ~o.oo - VERTICAL SECTION VIEW CJ 7" CASING POINT - ~8912 75~7 ]58B0 ~0.00 , , , Section at: 332.63 ~0~ ~TUDY ONLY'" Dep Scale.' ~ inch = 200 feet 6~oo'~i ~ ' [ Drawn ' 24 Jan [gg7 .~oo~--...~ ..... ~._.. ..... ]_ ................. :-..i ~ ~nadr~]] Sch]u~berger ~. ,,., I i i i i i iii ~ . . ~40o., i. ,. i I i - i i ~ j '. i ~ · 6500 ...... ' [ '" ~ ...... . ·" , . I I i:' I ' ' 6600 .. . ~ ( ' ' -. ['. '. J ' ': i " ~ - ~oo-- .... ~ ............. I. ,i ' '~oo i · .~ - ~s. ..... . ~ '., 7 .... . Mo~ ¢~ _ _ _... *'- ~'"'""~"', · , .. · , ~.~ ~".:-, .......-. ~ ', 7~00 , ' .~ - . I? 7500~- . ' ,, ~'.' ~soo-- ' -- ,, ~ , ~ .. - ~oo-~-: ............... ~ .~ ................ [.. I '~ . ~ .~ ~ , '- section i i Jan-24'97 03:18P Anadrill DPc 907 344 2160 P.O5 I m B) C) O) E) F) G)' H) I) J) K) L) Marker Identification ' A) KB KOP/BUILD t/~O0 BUILD BUILD 2/]00 BUILD 2.5/~00 END 2.5/100 BUILD BUILD 2.5/]00 END 2.5/]00 BUILD 9-5/B' CASINGPOINT DROP 2.5/~00 .END 2.5/]00 DROP TARGET- M) 7' CASING POINT N) TD SHARED. SERVICES DRILLING ii ..o MPF-42 (P5) PLAN VIEW '0 N . 0 E '30 0 N "0 E aO0 1:N 0 W 700 - $6-N-. B ~¢00 74 N 3g W 1832 324 N 1892 352 N 36B$ ' ~60B N 10716 7684 N. '16240 t2455 N 1B~02 13743 N ~8536 13936 N ~B9~2 14t03.N ~B9~2 ~4~03 N i68 182 832 3977 6446. W 7~13 7253 7300 7300 CLOSURE ..... : 15880 feet at Azimuth 332.63 DECLINATION.: +28.097 (E) SCALE.~ ...... : ! inch = 2200 feet DRAWN ....... : 24 Jan 1997 Ana#r.i ] ] $ch ] umberger t4300 ~3200 12~00 lJO00 9go0 -~ 8800 '7700 '6600. 5500 '4400 3300 2200 I100 0 ~00 <- WEST' EAST -> (~aOrJl] (c)g7-iU~I=4~5 3.0C t:24PI4P) .- . - - - - WELL PERMIT CHECKLISToo Y FIELD & POOL ~-~--/~ INIT CLASS WELL NAME GEOL AREA PROGRAM: exp[] dev [] redrl[] serv~wellbore seg[] ann disp para req[] 1133- ON/OFF SHO ADMINISTRATION ENGINEERING 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Permit fee attached ................... Lease number appropriate ............... Unique well name and number .............. Well located in a defined pool ............. Well located proper distance from drlg unit boundary. Well located proper distance from other wells ...... Sufficient acreage available in drilling unit ...... If deviated, is wellbore plat included ........ Operator only affected party .............. Operator has appropriate bond in force ......... Permit can be issued without conservation order .... Permit can be issued without administrative approval. Can permit be approved before 15-day wait ........ REMARKS 14. Conductor string provided ............... N 15. Surface casing protects all known USDWs ........ ~ N 16. CMT vol adequate to circulate on conductor & surf csg. .~ N_ 17. CMT vol adequate to tie-in long string to surf csg . . . Y 18. CMT will cover all known productive horizons ...... ~ N 19. Casing designs adequate for C, T, B & permafrost .... ~ N 20. Adequate tankage or reserve pit ............ 21. If a re-drill, has a 10-403 for abndnmnt been approved. .~/~ 22. Adequate wellbore separation proposed .......... 23. If diverter required, is it adequate .......... ~ N 24. Drilling fluid program schematic & equip list adequate .~ N 25. BOPEs adequate ..................... 6.~ N 26. BOPE press rating adequate; test to ~~ psig. Y~ N 27. Choke manifold complies w/API RP-53 (May 84) ...... ~ N 28. Work will occur without operation shutdown ....... ~ N 29. Is presence of H2S gas probable ............ ~ N GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures .... Y 31. Data presented on potential overpressure zones ..... Y/N 32. Seismic analysis of shallow gas zones .......... 33. Seabed condition survey (if off-shore) ........ / Y N 34. Contact name/phone for weekly progress reports . . ./ . Y N [exploratory only] GEOLOGY: ENGINEERING: COMMISSION: JDH_ ~ mcm kJ ' Comments/Instructions: HOWldlf- A:\FORMS\cheklist rev 01/97 Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER . ****************************** . ............................ ....... SCHLUMBERGER ....... . ............................ ****************************** COMPANY NAME : B.P. EXPLORATION WELL NAiViE : MPF-42 FIELD NAME : MILNE POINT BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-22741-00 REFERENCE NO : 97109 Date o1-03'-o [ -- LIS Ta~e Verification Listing Schlumberger Alaska Computing Center 28-APR-1998 08:52 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE · 98/04/28 ORIGIN : FLIC REEL NAME : 97109 CONTINUATION # : PREVIOUS REEL : CO~E4ENT : B.P. EXPLORATION, MILNE POINT MPF-42, API #50-029-22741-00 **** TAPE HEADER **** SERVICE NA~E : EDIT DATE : 98/04/28 ORIGIN : FLIC TAPE NAME : 97109 CONTINUATION # : 1 PREVIOUS TAPE : C03E4ENT : B.P. EXPLORATION, MILNE POINT MPF-42, API #50-029-22741-00 TAPE HEADER MILNEPOINT MWD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL : FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING MPF-42 500292274100 B.P. EXPLORATION SCHLUMBERGER WELL SERVICES 28-APR-98 BIT RUN1 97109 BOSSE DIXON BIT RUN 2 BIT RUN 3 6 13N iOE 2019 2715 41.50 41.50 12.20 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8. 500 9. 625 10893 . 0 LIS Ta~e Verification Listing Schlumberger Alaska Computing Center 28-APR-1998 08:52 3RD STRING PRODUCTION STRING Well drilled 15-FEB through 22-FEB-97 with MWD GR, and CDR/ADN. All data was collected in two bit runs. $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 ~DITEDM~RGEDMWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.5000 FILE SUMNARY LDWG TOOL CODE $ BASELINE CURVE FOR SHIFTS: GRCH CURVE SHIFT DATA (MEASURE~ DEPTH) START DEPTH STOP DEPTH ..................... 112.0 18819.5 BASELINE DEPTH 88888.0 18593.5 18557.0 18452.0 18446.0 18405.5 18393.0 18389.5 18381.5 18373.0 18370.0 18364.0 18358.5 18352.0 18340.0 18325.5 18315.0 18304.5 18299.5 18278.5 .......... EQUIVALENT UNSHIFTED DEPTH .......... MWD ....... 88898.0 18603.5 18569.0 18462.0 18455.5 18415.5 18404.0 18399.0 18392.0 18385.0 18381.0 18375.0 18370.0 18362.5 18352.5 18338.5 18328.0 18317.5 18312.0 18291.5 LIS TaKe Verification Listing Schlumberger Alaska Computing Center 18266.0 18252.0 18235.5 18221.0 18218.0 18201.0 18191.5 18168.0 18158.5 18150.0 18124.0 18113.5 18102.5 18098.5 18085.5 18073.5 18062.0 18058.0 18042.5 18036.5 18014.0 17999.5 17982.0 17970.5 17956.0 17942.5 17935.5 17921.5 17891.0 17872.0 17838.0 17800.5 17786.5 17766.5 17735.0 17722.0 17677.0 17663.5 17645.0 17617.0 17577.5 17548.5 17515.0 17490.0 17443.5 17437.0 17429.0 17372.0 17362.0 17068.5 16932.0 16907.5 16893.5 16866.5 16857.5 18278.5 18265 0 18248 5 18234 0 18232 0 18217 0 18206 5 18183 0 18175 0 18165.0 18139.0 18128.0 18116.5 18113.5 18100.5 18089.0 18077.5 18073.0 18057.0 18052.0 18028.5 18014.5 17997.5 17984.0 17970.0 17958.5 17950 5 17939 5 17906 0 17885 5 17853 0 17816 5 17800.5 17781.5 17749.0 17738.5 17694.0 17678.0 17659.5 17632.0 17594.5 17565.0 17531.5 17507.0 17461.5 17456.0 17448.5 17390. $ 17381.5 17089.5 16953.0 16928.0 16914.5 16888.5 16880.5 28-APR-1998 08:52 PAGE: LIS TaKe verification Listing Schlumberger Alaska Computing Center 16830.0 16786.0 16748.0 16687.5 16678.5 16655.5 16595.0 16575.5 16546.0 16523.0 16494.0 16470.0 16408.0 16401.5 16374.0 16349.5 16280.0 16251.0 16245.0 16188.5 16174.5 16144.5 16069.0 16026.5 16003.5 15921.5 15908.0 15886.5 15868.5 15860.5 15818.0 15797.0 15743.0 15604.5 15571.0 15498.5 15474.0 15446.0 15232.5 15119.5 15026.0 14905.5 14847.0 14796.5 14714.0 14621.5 14489.0 14429.5 13991.0 13815.5 13617.0 13388.0 13338.0 13282.0 13229.0 16851.5 16807.5 16769 0 16709 0 16700 5 16678 0 16618 0 16598 0 16569.0 16546.5 16517.5 16493.0 16433.5 16428.0 16401.0 16374.5 16303.5 16273.0 16268.0 16213.0 16197.0 16167.5 16093.0 16049.0 16027.0 15948.0 15933.0 15911.0 15891.5 15886.0 15845.0 15822.5 15768.5 15630.0 15594.0 15520.5 15500.0 15473.0 15259.0 15139.5 15045.5 14926.5 14868.5 14817.0 14735.0 14643.0 14507.5 14446.5 14011.0 13833.0 13637.5 13408.5 13352.0 13295.5 13245.5 28-APR-1998 08:52 PAGE: LIS Tap$ Verification Listing Schlumberger Alaska Computing Center 28-APR-1998 08:52 PAGE: 13135.0 12909.5 12591.5 12484.0 12450.0 12353.5 12222.5 11988.0 11878.0 11816.0 11779.0 11592.5 11464.0 11291.5 10888.0 10690.5 112.0 100.0 $ MERGED DATA SOURCE LDWG TOOL CODE .............. $ 13150.0 12922.0 12601.5 12498.5 12462.0 12368 0 12234 0 12001 5 11892 5 11831 0 11792 0 11602 0 11477 0 11303.0 10898.0 10698.0 112.0 i00.0 BIT RUN NO. MERGE TOP MERGE BASE 1 112.0 10896.0 2 10796.0 18819.5 The depth adjustments shown above reflect the MWD GR to the PDC GRCH logged by WA. Ail other MWD curves were carried with the GR. This file also contains the Very Enhanced QRO resisitivity with 2' average that was reprocessed at GeoQuest. The ADN quadrant outputs are as follows: ROBB/ROBU/ROBL/ROBR are bottom, upper, left, and right quadrant density; and are also listed as RHO1, RH02, RH03, RH04 in the LDWG listing. The other outputs (Delta Rho, PEF) are listed with their quadrants as DRHB/DRHU/DRHL/DRHR, PEB/PEU/PEL/PER. The LDWG outputs of CALA and CALS are HDIA and VDIA respe c ti vely. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 80 LIS Ta~e Verification Listing Schlumberger Alaska Computing Center 28-APR-1998 08:52 PAGE: 6 TYPE REPR CODE VALUE 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 39387 O0 000 O0 0 1 1 1 4 68 0000000000 FET MWD HR 39387 O0 000 O0 0 1 1 1 4 68 0000000000 RA MWD 0H~39387 O0 000 O0 0 1 1 1 4 68 0000000000 RP MWD OH~M39387 O0 000 O0 0 1 1 1 4 68 0000000000 VRA MWD 0H~139387 O0 000 O0 0 1 1 1 4 68 0000000000 VRP MWD 0H~39387 O0 000 O0 0 1 1 1 4 68 0000000000 DER MWD 0P~4~39387 O0 000 O0 0 1 1 1 4 68 0000000000 ROP MWD FPHR 39387 O0 000 O0 0 1 1 1 4 68 0000000000 GR MWD GAPI 39387 O0 000 O0 0 1 1 1 4 68 0000000000 RHO1 MWD G/C3 39387 O0 000 O0 0 1 1 1 4 68 0000000000 RH02 MWD G/C3 39387 O0 000 O0 0 1 1 1 4 68 0000000000 RH03 MWD G/C3 39387 O0 000 O0 0 1 1 1 4 68 0000000000 RH04 MWD G/C3 39387 O0 000 O0 0 1 1 1 4 68 0000000000 DRHOMWD G/C3 39387 O0 000 O0 0 1 1 1 4 68 0000000000 PEF MWD BN/E 39387 O0 000 O0 0 1 1 1 4 68 0000000000 DCALMWD IN 39387 O0 000 O0 0 1 1 1 4 68 0000000000 CALSMWD IN 39387 O0 000 O0 0 1 1 1 4 68 0000000000 CALAMWD IN 39387 O0 000 O0 0 1 1 1 4 68 0000000000 NPHII4WD PU-S 39387 O0 000 O0 0 1 1 1 4 68 0000000000 NRATMWD 39387 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 18819.500 FET.MWD -999.250 RA.MWD -999.250 RP.MWD -999.250 VRA.MWD -999.250 VRP.MWD -999.250 DER.MWD -999.250 ROP.MWD 81.511 GR.MWD -999.250 RHO1.MWD -999.250 RHO2.MWD -999.250 RHO3.MWD -999.250 RHO4.MWD -999.250 DRHO.MWD -999.250 PEF.MWD -999.250 DCAL.MWD -999.250 CALS.MWD -999.250 CALA.MWD -999.250 NPHI.MWD -999.250 NRAT.MWD -999.250 LIS Tap'e Verification Listing Schlumberger Alaska Computing Center 28-APR-1998 08:52 PAGE: DEPT. 18000. 000 FET. MWD VRA . MWD 1. 431 VRP . MWD GR.MWD 113.155 RHO1.MWD RH04 .MWD 2. 492 DRHO.MWD CAL S . MWD 8. 602 CALA . MWD DEPT. 17000. 000 FET.MWD VRA . MWD 2. 505 VR P . MWD GR.MWD 104.520 RHO1 .MWD RH04 .MWD 2. 456 DRHO.MWD CAL S . MWD 8. 535 CALA . MWD DEPT. 16000. 000 FET. MWD VRA. MWD 3 . 422 VRP. MWD GR.MWD 105. 428 RHO1 .MWD RH04 .MWD 2. 416 DRHO.MWD CALS.MWD 8. 468 CALA.MWD DEPT. 15000.000 FET.MWD VRA.MWD 2.994 VRP.I4WD GR.MWD 97.340 RHO1,MWD RHO4.MWD 2.414 DRHO.MWD CALS.MWD 8.668 CALA.MWD DEPT. 14000.000 FET.MWD VRA.MWD 3.126 VRP.MWD GR.MWD 102.289 RHO1.MWD RHO4.MWD 2.443 DRHO.MWD CALS.MWD 9.735 CALA.MWD DEPT. 13000.000 FET.MWD VRA.MWD 3.133 VRP.MWD GR.MWD 88.037 RHO1.MWD RHO4.MWD 2.317 DRHO.MWD CALS.MWD 9.068 CALA.MWD DEPT. 12000. 000 FET.MWD VRA . MWD 17. 413 VRP. MWD GR.MWD 54 . 241 RHO1 .MWD RH04. MWD 2. 602 DRHO. MWD CAL S . MWD 8. 602 CALA . MWD DEPT. 11000. 000 FET.MWD VRA . MWD 3. 205 VR P . MWD GR.MWD 72.128 RHO1.MWD RH04 .MWD 2. 260 DRHO.MWD CALS.MWD 9. 017 CALA.MWD DEPT. 10000.000 FET.MWD VRA.MWD -999.250 VRP.MWD GR.MWD 108.670 RHO1.MWD RHO4.MWD ~999.250 DRHO.MWD CALS.MWD -999.250 CALA.MWD 1.232 RA.MWD 1.426 DER.MWD 2.551 RHO2.MWD 0.048 PEF.MWD 8.868 NPHI.MWD 0.544 RA.MWD 2.556 DER.MWD 2.458 RHO2.MWD 0.029 PEF.MWD 8.802 NPHI.MWD 0.621 RA.MWD 3.796 DER.MWD 2.453 RHO2.MWD 0.009 PEF.MWD 8.402 NPHI.MWD 0.365 RA.MWD 3.339 DER.MWD 2.415 RHO2.MWD -0.001 PEF.MWD 9.068 NPHI.MWD 1.498 1.476 2.481 3.746 40.500 2.579 2. 572 2. 400 2. 864 37.400 3.474 3.679 2.397 2.996 33.000 3.216 3.336 2.415 3.110 36.700 0.990 RA.MWD 3.164 3.454 DER.MWD 3.337 2.453 RHO2.MWD 2.441 0.093 PEF.MWD 2.637 10.402 NPHI.MWD 36.800 O. 262 RA.MWD 3.303 DER . MWD 2. 379 RH02. MWD O. 033 PEF. MWD 8. 668 NPHI. MWD 0.537 RA.MWD 22.361 DER.MWD 2.684 RHO2.MWD 0,045 PEF.MWD 8.802 NPHI.MWD O . 610 RA . MWD 3. 246 DER .MWD 2. 296 RH02 .MWD O, 026 PEF.MWD 8,786 NPHI.MWD -999.250 RA.MWD -999,250 DER.MWD -999,250 RHO2.MWD -999.250 PEF.MWD -999,250 NPHI.MWD 3.102 3.213 2. 302 2. 691 35. 700 7. 003 9. 691 2.593 4. 327 20. 400 3. 427 3.250 2.173 3. 634 43.100 -999.250 -999.250 -999.250 -999.250 -999.250 RP.MWD ROP. MWD R H 0 3 . MWD DCAL , MWD NRA T . MWD RP.MWD ROP. MWD RH03. MWD DCAL , MWD NRA T . MWD RP.MWD ROP. MWD RH0 3 . MWD DCAL . MWD NRA T . MWD RP.MWD ROP. MWD RH03 . MWD DCAL . MWD NRA T . MWD RP.MWD ROP. MWD R H 0 3 . MWD DCAL . MWD NRA T. MWD RP.MWD ROP. MWD RH03 . MWD DCAL . MWD NRA T . MWD RP.MWD ROP. MWD RH03. MWD DCAL . MWD NRA T. MWD RP.MWD ROP. MWD RH 0 3 . MWD DCAL . MWD NRA T . MWD RP.MWD ROP. MWD RH03. MWD DCAL , MWD NRA T. MWD 1.462 113.219 2.496 0.158 23.675 2. 568 47. 368 2. 393 O. 098 22. 620 3.805 222.206 2.436 0.308 20.973 3.407 400.043 2.405 0.136 22.344 3. 446 272. 726 2. 428 O. 129 22. 389 3.279 391.506 2. 330 O. 258 22. 005 12. 591 102. 857 2. 589 O. 150 15. 475 3.169 72.581 2.238 0.854 24.496 -999.250 96.650 -999.250 -999.250 -999.250 LIS Tap'e Verification Listing Schlumberger Alaska Computing Center 28-APR-1998 08:52 PAGE: DEPT. 9000.000 FET.MWD VRA,MWD -999.250 VRP.MWD GR.MWD 84.520 RHO1.MWD RHO4.MWD -999.250 DRHO,MWD CALS.MWD -999.250 CALA.MWD DEPT. 8000.000 FET.MWD VRA.MWD -999.250 VRP.MWD GR.MWD 60.370 RHO1.MWD RHO4.MWD -999.250 DRHO.MWD CALS.MWD -999.250 CALA.MWD DEPT. 7000.000 FET.MWD VRA.~4WD -999.250 VRP.MWD GR.MWD 48.300 RHO1.MWD RHO4.MWD -999.250 DRHO.MWD CALS.MWD -999.250 CALA.MWD -999.250 RA.MWD -999.250 DER.MWD -999.250 RHO2.MWD -999.250 PEF.MWD -999.250 NPHI.MWD -999.250 RA.MWD -999.250 DER.MWD -999.250 RHO2.MWD -999.250 PEF.MWD -999.250 NPHI.MWD -999.250 RA.MWD -999.250 DER.MWD -999.250 RHO2.MWD -999.250 PEF.MWD -999.250 NPHI.MWD -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 DEPT. 6000.000 FET.MWD -999.250 RA.MWD -999.250 VRA.MWD -999.250 VRP.MWD -999.250 DER.MWD -999.250 GR.MWD 79.440 RHO1.MWD -999.250 RHO2.MWD -999.250 RHO4.MWD -999.250 DRHO.MWD -999.250 PEF.MWD -999.250 CALS.MWD -999.250 CALA.MWD -999.250 NPHI.MWD -999.250 -999.250 RA.MWD -999.250 DER.MWD -999.250 RHO2.MWD -999.250 PEF.MWD -999.250 NPHI.MWD DEPT. 5000.000 FET.MWD VRA.MWD -999.250 VRP.MWD GR.MWD 51.940 RHO1.MWD RHO4.MWD -999.250 DRHO.MWD CALS.MWD -999.250 CALA.MWD DEPT. 4000.000 FET.MWD VRA.MWD -999.250 VRP.MWD GR.MWD 64.160 RHO1.MWD RHO4.MWD -999.250 DRHO.MWD CALS.MWD -999.250 CALA.MWD -999.250 RA.MWD -999.250 DER.MWD -999.250 RHO2.MWD -999.250 PEF.MWD -999.250 NPHI.MWD -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 DEPT. 3000.000 FET.MWD -999.250 RA.MWD -999.250 VRA.MWD -999.250 VRP.MWD -999.250 DER.MWD -999.250 GR.MWD 67.220 RHO1.MWD -999.250 RHO2.MWD -999.250 RHO4.MWD -999.250 DRHO.MWD -999.250 PEF.MWD -999.250 CALS.MWD -999.250 CALA.MWD -999.250 NPHI.MWD -999.250 DEPT. 2000.000 FET. MWD VRA.MWD -999.250 VRP.MWD GR.MWD 55.443 RHO1.MWD RHO4.MWD -999.250 DRHO.MWD CALS.MWD -999.250 CALA.MWD -999.250 RA.MWD -999.250 DER.MWD -999.250 RHO2.MWD -999.250 PEF.MWD -999.250 NPHI.MWD -999.250 RA.MWD -999.250 DER.MWD -999.250 RHO2.MWD -999.250 PEF.MWD -999.250 NPHI.MWD DEPT. 1000.000 FET.MWD VRA.MWD -999.250 VRP.MWD GR.MWD 31.760 RHO1.MWD RHO4.MWD -999.250 DRHO.MWD CALS.MWD -999.250 CALA.MWD -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 RP.MWD ROP.MWD RHO3.MWD DCAL.MWD NRAT.MWD RP.MWD ROP.MWD RHO3.MWD DCAL.MWD NRAT.MWD RP.MWD ROP. MWD RH 0 3 . MWD DCAL. MWD NRA T . MWD RP.MWD ROP.MWD RHO3.MWD DCAL.MWD NRAT.MWD RP.MWD ROP. MWD RH 0 3 . MWD DCAL . MWD NRA T. MWD RP.MWD ROP. MWD RH 0 3 . MWD DCAL . MWD NRA T. MWD RP. MWD ROP. MWD RH 0 3 . MWD DCAL . MWD NRAT.MWD RP.MWD ROP.MWD RHO3.MWD DCAL.MWD NRAT.MWD RP.MWD ROP. MWD RH 0 3 . MWD DCAL . MWD NRA T . MWD -999.250 40.450 -999.250 -999.250 -999.250 -999.250 493.230 -999.250 -999.250 -999.250 -999.250 126.050 -999.250 -999.250 -999.250 -999.250 174.070 -999.250 -999.250 -999.250 -999.250 496.980 -999.250 -999.250 -999.250 -999.250 831.320 -999.250 -999.250 -999.250 -999.250 442.990 -999.250 -999.250 -999.250 -999.250 376.190 -999.250 -999.250 -999.250 -999.250 205.800 -999.250 -999.250 -999.250 'LIS Tap~ Verification Listing Schlumberger Alaska Computing Center 28-APR-1998 08:52 PAGE: DEPT. 112.000 FET.MWD VRA.MWD -999.250 VRP.MWD GR.MWD -999.250 RHO1.MWD RHO4.MWD -999.250 DRHO.MWD CALS.MWD -999.250 CALA.MWD -999.250 RA.MWD -999.250 DER.MWD -999.250 RHO2.MWD -999.250 PEF.MWD -999.250 NPHI.MWD -999.250 RP.MWD -999.250 ROP.MWD -999.250 RHO3.MWD -999.250 DCAL.MWD -999.250 NRAT.MWD -999.250 301.430 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE H~ER **** FILE NAME : EDIT .002 SERVICE . FLIC VERSION : O01CO1 DATE : 98/04/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: O. 5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH MWD 112.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (FIE~ORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): STOP DEPTH .......... 10896.0 22-FEB-97 IDEAL 4.0C REAL-TIME 18810.0 112.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-APR-1998 08:52 PAGE: 10 BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE '. MAXIMUM ANGLE: 18810.0 70 0.1 77.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GA~A RAY $ TOOL NUMBER MWD GR BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 8.500 10893.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.90 MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (0I~4~I) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 2. 520 MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): 2. 380 MUD CAKE AT (MT): 68.0 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): ~S: *** RUN 1 (MWD GR)*** DRILLED INTERVAL 112' - 10914' *** RUN 2 (CDR/ADN) *** RES TO BIT: 58.82'; GR TO BIT: 69.82' NEUT TO BIT: 116.87'; DENS TO BIT: 112.74' GR AND TNPH CORRECTED FOR ENVIRONN~NTAL FACTORS DATA FROM DOWNHOLE MEMORY, V4. OC SOFTWARE ***THIS IS THE DATA FROM RUN 1 (MWD GR) **** $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-APR-1998 08:52 PAGE: 11 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 12 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 85 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~iE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 39387 O0 000 O0 0 2 1 1 4 68 0000000000 ROPE LW1 F/HR 39387 O0 000 O0 0 2 1 1 4 68 0000000000 GR LW1 GAPI 39387 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 10896.000 ROPE. LW1 82.250 GR.LW1 -999.250 DEPT. 10000.000 ROPE. LW1 104.020 GR.LW1 104.650 DEPT. 9000.000 ROPE. LW1 47.490 GR.LW1 84.520 DEPT. 8000. 000 ROPE. LW1 540. 720 GR.LW1 55. 345 DEPT. 7000.000 ROPE.LW1 257.810 GR.LW1 44.275 DEPT. 6000.000 ROPE. LW1 192.800 GR.LW1 83.804 DEPT. 5000. 000 ROPE. LW1 485. 260 GR. LW1 50. 920 DEPT. 4000.000 ROPE. LW1 780.220 GR.LW1 58.050 ~LIS Ta~e Verification Listing Schlumberger Alaska Computing Center 28-APR-1998 08:52 PAGE: 12 DEPT. 3000. 000 ROPE.LW1 DEPT. 2000. 000 ROPE.LW1 DEPT. 1000.000 ROPE.LW1 DEPT. 112. 000 ROPE.LW1 441 . 930 GR. LWl 67. 220 355.040 GR.LW1 60.280 201.220 GR.LW1 32.300 301.430 GR.LW1 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAt4E : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUFiBER: 2 DEPTH INCREMENT: 0.5000 FILE SU~VLARY VENDOR TOOL CODE START DEPTH MWD 10796.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (ME~IORY or REAL-TIME): TD DRILLER (FT) : STOP DEPTH .......... 18809.5 22-FEB-97 IDEAL 4.0C MEMORY 18810.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-APR-1998 08:52 PAGE: 13 TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: 112.0 18810.0 78 28.1 76.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CDR RESIST./GR ADN AZ. DENS./NEUT. $ TOOL NUMBER RGS751 ADN059 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) 8.500 10893.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.90 MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : 200 FLUID LOSS (C3): RESISTIVITY (Oink4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT) : 2. 520 MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): 2. 380 MUD CAKE AT (MT): 68.0 68.0 NEUTRON TOOL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): 1.0 EWR FREQUENCY (HZ) '. 20000 REMARKS: *** RUN 1 (MWD GR)*** DRILLED INTERVAL 112' - 10914' *** RUN 2 (CDR/ADN) *** RES TO BIT: 58.82'; GR TO BIT: 69.82' NEUT TO BIT: 116.87'; DENS TO BIT: 112.74' GR AND TNPH CORRECTED FOR ENVIRONMENTAL FACTORS DATA FROM DOWNHOLE MEMORY, V4. OC SOFTWARE ***THIS IS THE DATA FROM RUN 2 (CDR/ADN) **** $ LIS FORMAT DATA =LIS Ta~e Verification Listing Schlumberger Alaska Computing Center 28-APR-1998 08:52 PAGE: 14 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 108 4 66 1 $ 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 9 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 39387 O0 000 O0 0 3 1 1 4 68 0000000000 ATR LW2 OPff4M 39387 O0 000 O0 0 3 1 1 4 68 0000000000 PSR LW2 OH~ 39387 O0 000 O0 0 3 1 1 4 68 0000000000 ATVR LW2 OH~ 39387 O0 000 O0 0 3 1 1 4 68 0000000000 PSVR LW2 OHMM 39387 O0 000 O0 0 3 1 1 4 68 0000000000 DER LW2 OH~M 39387 O0 000 O0 0 3 1 1 4 68 0000000000 ROPE LW2 F/HR 39387 O0 000 O0 0 3 1 1 4 68 0000000000 GR LW2 GAPI 39387 O0 000 O0 0 3 1 1 4 68 0000000000 TABR LW2 39387 O0 000 O0 0 3 1 1 4 68 0000000000 ROBB LW2 G/C3 39387 O0 000 O0 0 3 1 1 4 68 0000000000 ROBU LW2 G/C3 39387 O0 000 O0 0 3 1 1 4 68 0000000000 ROBL LW2 G/C3 39387 O0 000 O0 0 3 1 1 4 68 0000000000 ROBR LW2 G/C3 39387 O0 000 O0 0 3 1 1 4 68 0000000000 DRHB LW2 G/C3 39387 O0 000 O0 0 3 1 1 4 68 0000000000 DRHU LW2 G/C3 39387 O0 000 O0 0 3 1 1 4 68 0000000000 DRHL LW2 G/C3 39387 O0 000 O0 0 3 1 1 4 68 0000000000 DRHR LW2 G/C3 39387 O0 000 O0 0 3 1 1 4 68 0000000000 PEB LW2 39387 O0 000 O0 0 3 1 1 4 68 0000000000 PEU LW2 39387 O0 000 O0 0 3 1 1 4 68 0000000000 PEL LW2 39387 O0 000 O0 0 3 1 1 4 68 0000000000 PER LW2 39387 O0 000 O0 0 3 1 1 4 68 0000000000 CALN LW2 PU 39387 O0 000 O0 0 3 1 1 4 68 0000000000 TNPH LW2 39387 O0 000 O0 0 3 1 1 4 68 0000000000 NRAT LW2 IN 39387 O0 000 O0 0 3 1 1 4 68 0000000000 DCAL LW2 IN 39387 O0 000 O0 0 3 1 1 4 68 0000000000 HDIA LW2 IN 39387 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tap~e Verification Listing Schlumberger Alaska Computing Center 28-APR-1998 08:52 PAGE: 15 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) VDIA LW2 RPM 39387 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 18809.500 ATR.LW2 -999.250 PSR.LW2 -999.250 ATVR.LW2 PSVR.LW2 -999.250 DER.LW2 -999.250 ROPE. LW2 81.511 GR.LW2 TABR.LW2 -999.250 ROBB.LW2 -999.250 ROBU. LW2 -999.250 ROBL.LW2 ROBR. LW2 -999. 250 DRHB. LW2 -999. 250 DRHU. LW2 - 999. 250 DRHL. LW2 DRHR.LW2 -999.250 PEB.LW2 -999.250 PEU. LW2 -999.250 PEL.LW2 PER.LW2 -999.250 CALN. LW2 -999.250 TNPH. LW2 -999.250 NRAT.LW2 DCAL.LW2 -999.250 H~IA.LW2 -999.250 VDIA.LW2 -999.250 DEPT. PSVR . LW2 TABR . LW2 ROBR . LW2 DRHR . LW2 PER. LW2 DCAL. LW2 DEPT PSVR LW2 TABR LW2 ROBR LW2 DRHR LW2 PER LW2 DCAL LW2 DEPT. PSVR . LW2 TABR . LW2 ROBR . LW2 DRHR . LW2 PER. LW2 DCAL . LW2 DEPT. PSVR . LW2 TABR . LW2 ROBR . LW2 DRHR. LW2 PER. LW2 DCAL. LW2 DEPT. PSVR . LW2 TABR . LW2 ROBR. LW2 DRHR . LW2 18000. 000 1 867 1 146 2 499 0 034 3 771 8 602 17000. 000 2.586 O. 273 2.415 O. 047 3.110 9. 135 16000. 000 3. 735 O. 694 2. 423 O. 043 2. 915 8. 902 15000. 000 3. 608 0.417 2. 378 -0. 001 2. 703 8. 535 14000.000 3.433 1.129 2.437 0.057 ATR. LW2 1 . 792 PSR. LW2 1 . 874 DER.LW2 1. 840 ROPE.LW2 96. 756 ROBB.LW2 2.514 ROBU. LW2 2.505 DRHB . LW2 O . 043 DRHU. LW2 O . 074 PEB. LW2 4. 093 PEU. LW2 4.213 CALN. LW2 35.300 TNPH. LW2 21.837 HDIA. LW2 8. 668 VDIA. LW2 61 . 000 ATR.LW2 2. 639 PSR.LW2 2. 631 DER.LW2 2.634 ROPE.LW2 71.115 ROBB. LW2 2. 449 ROBU. LW2 2. 419 DRHB.LW2 O. 028 DRHU. LW2 O. 047 PEB . LW2 2.840 PEU. LW2 2.856 CALN. LW2 31. 800 TNPH. LW2 20. 506 HDIA. LW2 9. 535 VDIA. LW2 85. 000 ATR. LW2 3. 505 PSR. LW2 3. 890 DER.LW2 3.741 ROPE.LW2 100.556 ROBB. LW2 2. 424 ROBU. LW2 2. 399 DRHB. LW2 - O. 003 DRHU. LW2 O. 092 PEB. LW2 2.518 PEU. LW2 2. 599 CALN. LW2 33. 600 TNPH. LW2 21 . 199 HDIA.LW2 9.235 VDIA.LW2 70.000 ATR. LW2 3. 086 PSR. LW2 3. 626 DER. LW2 3.398 ROPE. LW2 185.573 ROBB. LW2 2.403 ROBU. LW2 2.375 DRHB. LW2 O. 002 DRHU. LW2 O. 003 PEB . LW2 2.948 PEU. LW2 3.147 CALN. LW2 37. 700 TNPH. LW2 22. 726 HDIA.LW2 9.135 VDIA.LW2 78.000 ATR.LW2 3.192 PSR.LW2 3.511 DER.LW2 3. 386 ROPE. LW2 300. 073 ROBB. LW2 2. 435 ROBU. LW2 2. 394 DRHB.LW2 0.008 DRHU. LW2 0.115 PEB. LW2 2. 978 PEU. LW2 3. 098 ATVR LW2 GR LW2 ROBL LW2 DRHL LW2 PEL LW2 NRAT LW2 A TVR . L W2 GR. LW2 ROBL. LW2 DRtIL. LW2 PEL. LW2 NRA T. LW2 A TVR . LW2 GR. LW2 ROBL. LW2 DRHL. LW2 PEL. LW2 NRA T. LW2 ATVR. LW2 GR. LW2 ROBL. LW2 DRHL. LW2 PEL. LW2 NRA T . LW2 A TVR . LW2 GR. LW2 ROBL. LW2 DRHL. LW2 PEL. LW2 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 1.863 120.270 2.517 0.058 3.696 0.200 2.531 106.210 2.435 0.041 2.946 0.092 3. 350 105. 760 2. 419 O. 061 2. 828 0.316 3.166 95.547 2.434 0.033 3.437 0.090 3.097 93.156 2.411 0.059 2.851 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-APR-1998 08:52 PAGE 16 PER. LW2 3.163 CALN. LW2 DCAZ. LW2 8.831 HDIA. LW2 DEPT. 13000. 000 ATR. LW2 PSVR . LW2 3 . 297 DER. LW2 TABR . LW2 O . 296 ROBB . LW2 ROBR . LW2 2.358 DRHB . LW2 DRHR. LW2 O . 054 PEB. LW2 PER. LW2 2. 653 CALN. LW2 DCAL. LW2 8.618 HDIA. LW2 DEPT. PSVR . LW2 TAB R . L W2 ROBR . LW2 DRHR . LW2 PER. LW2 D CAL . L W2 12000.000 3 532 0 490 2 216 0 007 2 452 8 906 DEPT. 11000. 000 PSVR. LW2 3.433 TABR . LW2 O . 936 ROBR. LW2 2.330 DRHR. LW2 O . 054 PER. LW2 2.961 DCAZ. LW2 9. 335 A TR . LW2 DER. LW2 ROBB. LW2 DPOqB. LW2 PEB. LW2 CALN. LW2 HDIA. LW2 ATR. LW2 DER. LW2 ROBB. LW2 DRHB. LW2 PEB. LW2 CALN. LW2 HDIA. LW2 3 6.900 TNPH. LW2 8. 868 VDIA. LW2 3.219 3 239 2 383 0 013 2 502 39 900 8 752 4. 351 3. 921 2.307 O. 038 2. 914 38. 700 9.106 3.217 3. 365 2.309 O. 032 3. 641 38. 400 9.269 PSR . LW2 ROPE. LW2 ROBU. LW2 DRHU. LW2 PEU. LW2 TNPH. LW2 VDIA . LW2 PSR . LW2 ROPE. LW2 ROBU. LW2 DRHU. LW2 PEU. LW2 TNPH. LW2 VDIA. LW2 PSR. LW2 ROPE. LW2 ROBU. LW2 DR}HI. LW2 PEU. LW2 TNPH. LW2 VDIA . LW2 DEPT. 10796. 000 ATR.LW2 -999.250 PSR.LW2 PSVR. LW2 -999. 250 DER. LW2 -999. 250 ROPE. LW2 TABR.LW2 -999.250 ROBB.LW2 -999.250 ROBU. LW2 ROBR.LW2 -999.250 DRHB.LW2 -999.250 DRHU. LW2 DRHR. LW2 -999. 250 PEB. LW2 -999. 250 PEU. LW2 PER.LW2 -999.250 CALN. LW2 -999.250 TNPH.LW2 DCAL.LW2 -999.250 HDIA.LW2 -999.250 VDIA.LW2 22.444 101.000 3.251 315.819 2.317 0.093 2.895 23.473 59.000 3.763 360 116 2 164 0 170 2 579 23 072 51 140 3. 456 86. 956 2.284 O. 126 3. 079 22. 957 65. 000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 NRAT. LW2 ATVR. LW2 GR. LW2 ROBL. LW2 DRHL. LW2 PEL. LW2 NRA T . L W2 A TVR . L W2 GR. LW2 ROBL . LW2 DRHL. LW2 PEL. LW2 NRA T . L W2 A TVR . LW2 GR. LW2 ROBL. LW2 DRHL. LW2 PEL. LW2 NRA T . L W2 A TVR . LW2 GR. LW2 ROBL. LW2 DRHL. LW2 PEL . LW2 NRA T . LW2 O. 412 3.114 86. 038 2. 321 O. 058 2. 749 0.338 3. 493 82. 836 2.248 O. 131 2. 983 O. 843 3. 481 79.135 2.317 O. 088 3.190 O. 458 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAI~E : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : ~LIS Ta~e Verification Listing Schlumberger Alaska Computing Center 28-APR-1998 08:52 PAGE: 17 **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/04/28 ORIGIN : FLIC TAPE NAME : 97109 CONTINUATION # : 1 PREVIOUS TAPE : COM~i~T : B.P. EXPLORATION, MILNE POINT MPF-42, API #50-029-22741-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 98/04/28 ORIGIN : FLIC REEL NAME : 97109 CONTINUATION # PREVIOUS REEL .. CO~4~NT : B.P. EXPLORATION, MILNE POINT MPF~42, API #50-029-22741-00