Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout207-066CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: NOT OPERABLE: MPH-17 (PTD# 2070660) Missed AOGCC Witnessed MIT-IA Date:Wednesday, August 30, 2023 3:45:48 PM From: Ryan Thompson <Ryan.Thompson@hilcorp.com> Sent: Wednesday, August 30, 2023 2:43 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Taylor Wellman <twellman@hilcorp.com> Subject: NOT OPERABLE: MPH-17 (PTD# 2070660) Missed AOGCC Witnessed MIT-IA Mr. Wallace – PWI well MPH-17 (PTD# 2070660) is currently shut in and will not be brought online for its scheduled 4 year MIT-IA due this month. The well will now be classified as NOT OPERABLE and will remain shut in. A witnessed MIT-IA will be scheduled once the well is returned to injection. Please respond with any comments or concerns. Thanks, Ryan Thompson Milne / Islands Well Integrity Engineer 907-564-5005 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Re DATE: Monday, August 5, 2019 �% qI P.1. Supgrvisor kepi � DI �JI�s1 SUBJECT: Mechanical Integrity Tests ( I Hilcorp Alaska LLC H-17 FROM: Brian Bixby MILNE PT UNIT H-17 Petroleum Inspector Ste: Inspector Reviewed By: P.I. Supry J� NON -CONFIDENTIAL Comm Well Name MILNE PT UNIT H-17 API Well Number 50-029-23358-00-00 Inspector Name: Brian Bixby Permit Number: 207-066-0 Inspection Date: 8/1/2019 - Insp Num: mitBDB190805070331 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well H-17 Type Inj w, TVD 3656 - Tubing oos 1047 1048 1049 PTD 2070660 Type Test SPT Test psi 1500 IA 679 1729 1670 1661 BBL Pumped: E 0.7 BBL Returned: 0.7 OA 177 8 - 181 is; Infnrval I 41RTST IPIF P Notes: Monday, August 5, 2019 Page 1 of I 0 0 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday,September 02,2015 TO: Jim Regg P.I.Supervisor ' ,ep 9/411(5 SUBJECT: Mechanical Integrity Tests t HILCORP ALASKA LLC H-17 FROM: Bob Noble MILNE PT UNIT SB H-17 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry .JQ-- NON-CONFIDENTIAL Comm Well Name MILNE PT UNIT SB H-17 API Well Number 50-029-23358-00-00 Inspector Name: Bob Noble Permit Number: 207-066-0 Inspection Date: 8/31/2015 Insp Num: mitRCN150831164933 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well I H-17 Type Inj 1 W'HTVD j 3656 Tubing 998 - 1000 . 996- 994 . PTD I 2070660 ' Type Testi SPT Test psis 1500 - IA 188 1820 . 1738 - 1719 , Interval 14YRTST P/F I P v. OA 245 399 . 391 391 - Notes: SCANNED : - : Wednesday,September 02,2015 Page 1 of 1 ~ • ~~~ ~ ~~~~~~~ ~~~ ~~~~~~ ~~~~ ~~~~~~ ' ~' ~ ~9"g?/1lZ917~ (done) RES AN Color Items: ~reyscale Items: ^ Poor Quality Originals: ^ Other: ^ Two-sided I~~ ~~'~II ~I II~ ~I S~I DIG AL DAT/~ Diskettes, No. ' ^ Other, No/Type: ^ Rescan IVeeded ~II II~I~IIIII IIIIII OVERSiZED (Scannablej ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: NOTESa BY: Maria Date: g ~~ D ^ Other:: ~S~ Project Proofing II I II ~I I) I((II (( III BY: Maria Date: ~ ~ ~ ~ ~S~ P aration Pre annin S x 30 ~ = v +~= TOTAL PAGES~ p g c _ , ~ ~ q (Count does not include cover sheet) / / BY: Maria Date: R ~ ~ s Production Scanning Stage 1 BY: Stage 1 BY: Page Count from Scanned File: ~~ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: ~YES NO Maria Date: S /3 f O~ ~S~ ~- ~ I If NO in stage 1, page(s) discrepancies were found: YES NO Maria Date: /s/„ „_,...,.,. .. . Scanning is complete at this point unless rescanning is required. R@SCaI!!'~@CI III IIIIIIIIIII IIIII BY: Maria Date: ~S~ Comments about this file: Quality Checked II) II'll~ ~l) lill ~ll 10/6/2005 Well History File Cover Page.doc bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 0 December 30, 2011 SI,MNEOPEB Z01 (49) Mr. Tom Maunder a,o Alaska Oil and Gas Conservation Commission I 1, 333 West 7 Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of MPH -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPH -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) MPH -Pad 10/9/2011 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft gal MPH-01 1900860 50029220610000 Dust Cover NA NA NA 6.8 9/4/2011 MPH-02 1900870 50029220620000 Sealed Conductor NA NA NA NA NA MPH -03 1900880 50029220630000 Sealed Conductor NA NA NA NA NA MPH-04 1900890 50029220640000 Sealed Conductor NA NA NA NA NA MPH-05 1950980 50029225720000 1.3 NA 1.3 NA 11.9 8/17/2011 MPH-06 1951150 50029225800000 0.2 NA 0.2 NA 5.1 10/9/2011 MPH -07A 2020240 50029225970100 6 NA 6 NA 59.5 10/31/2009 MPH -088 2010470 50029228080200 1.2 NA 1.2 NA 17.0 9/4/2011 MPH-09 1971650 50029228040000 1.8 NA 1.8 NA 17.0 8/17/2011 MPH-10 1971490 50029227950000 1.2 NA 1.2 NA 11.9 10/31/2009 MPH-11 1971630 50029228020000 0.5 NA 0.5 NA 3.4 9/4/2011 MPH-12 1971700 50029228070000 0.5 NA 0.5 NA 3.4 9/4/2011 MPH -13A 2021670 50029228180100 0.8 NA 0.8 NA 8.5 8/17/2011 MPH-15 2051590 50029232840000 0.5 NA 0.5 NA 5.1 8/17/2011 MPH-16 2041900 50029232270000 1.8 NA 1.8 NA 17.0 8/17/2011 MPH-17 2070660 50029233580000 1.3 NA 1.3 NA 13.6 , 8/17/2011 MPH -18 2041740 50029232240000 18.6 NA Need top job MPH-19 2071360 50029233710000 0.1 NA 0.1 NA 2.6 9/4/2011 • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Thursday, September 15, 2011 TO: Jim Regg c� P.I. Supervisor 2� `( �r SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC H -l7 FROM: Bob Noble MILNE PT UNIT SB H -17 Petroleum Inspector Src: Inspector Reviewed By: P.I. Suprv NON CONFIDENTIAL Comm Well Name: MILNE PT UNIT SB H - 17 - API Well Number: 50 029 - 23358 - 00 - 00 Inspector Name: Bob Noble Insp Num: mitRCNI 10909172333 Permit Number: 207 - 066 - Inspection Date: 9/9/2011 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well H-17 '!Type Inj. W ' TVD 3656 , IA 10 1717 1660 1645 - P.T.DI 2070660 ' SPT Test psi 1 1500 OA 180 350 350 350 Interval 4YRTST P/F P • Tubing 921 924 922 925 Notes: II I i Thursday, September 15, 2011 Page 1 of 1 • i WELL LOG C tk; PS TRANSMITTAL PROACTIVE DAAGNNOSTIC SERVICES, INC. To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793 -1225 RE: Cased Hole /Open Hole /Mechanical Logs and/or Tubing Inspection(Caliper / MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastufka LJ �:L c- s — 4 03G3 LR2 -1 900 Benson Blvd. Anchorage, Alaska 99508 G , and ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Roads Suite C Anchorage, AK 99518 Fax: (907) 245 -8952 1) Injection Profile 29- Aug-10 MPU G-09 BL/ EDE 50 -029- 22779 -00 2) Injection Profile 01-Sep-10 MPU H -17 BL/ EDE ,- 50-09- 2335• ; _ v Signed: - Date Print Name: a .8 PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245 -8951 FAx: (907)245 -88952 E- MAIL : pdsanchorageCa rnernorvlog .corn WESSITE : www.memoryloa.com CADocuments and Settings\Diane Williams \Desktop \Tmnsmit_BP.docx ~ s ~~r~. ~n ~~ ~" _ ~.~ ~~ -~~~ ~~ ,, ~~ . ~ ~ : ~ ,. ~ ,~ ~. I ~ ~ °'~' ~~~ - ~~ MICROFILMED 6/30/201.0 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc ~ ~ IB-t~..c~., DATA SUBMITTAL COMPLIANCE REPORT 7/6/2009 Permit to Drill 2070660 Well Name/No. MILNE PT UNIT SB H-17 Operator BP EXPLORATION (ALASK~ INC API No. 50-029-23358-00-00 MD 12550 TVD 4154 Completion Date 7/28/2007 Completion Status 1WINJ Current Status 1WINJ UIC Y REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATIDN Types Electric or Other Logs Run: GR, RES, OHOTO GYRO, NEU/DEN, IFR/CASANDRA, PWD, SCMT (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log ~og Run Interval OH / T~iie Med/Frmt Number Name Log Cement Evaluation ED D Asc Directional Survey D C Lis 15456 ' Gamma Ray pt 15799 LIS Verification D C Pdf 15799 ~e Notes C Lis 1579~nduction/Resistivity C Lis 15803~duction/Resistivity 15803 LIS Verification LIS Verification C Lis 15837~duction/Resistivity Scaie Meaia No Start Stop GFI Received Gomments 5 Col 1 4414 8581 Case 7/30l2007 CBiL, USIi', GPIT, GR, CCL 21-Ju1-2007 0 12550 Open 8/23/2007 4414 7213 Case 9/28/2007 ~IS Veri, USIT, CCL w/ PDS and TIF Graphics 159 449 Open 12/28/2007 RPD, RPM, RPS, FET, GR, ROP 0 0 Open 12/28/2007 Graphics Only RPD, RPM, RPS, FET, GR, ROP Includes P61 159 449 Open 12/28/2007 PB1 RPD, RPM, RPS, FET, GR, ROP 172 12483 Open 12/28/2007 LIS Veri, GR< PRM, PRD, RPS, ROP, FET, FCNT, NCNT, NPHI, DRHO, RHOB 172 12483 Open 12/28/2007 LIS Veri, GR< PRM, PRD, RPS, ROP, FET, FCNT, NCNT, NPHi, DRHO, RHOB 159 449 Open 1/15/2008 P61 Redo LIS Veri, RPD, ' RPM, RPS, FET, GR, ROP 159 449 Open 1/15/2008 P81 Redo LIS Veri, RPD, RPM, RPS, FET, GR, ROP I i~ ~ DATA SUBMITTAL COMPLIANCE REPORT 7/6/2009 Permit to Driil 2070660 Well Name/No. MILNE PT UNIT SB H-17 Operator BP EXPLORATION (ALASF(A) INC API No. 50-029-23358-00-00 MD 12550 ND 4154 Completion Date 7/28/2007 Completion Status 1WINJ Current Status 1WINJ UIC Y og Pressure 5 Blu 8000 12500 Case 7/1/2008 Mem IPROF, Spin, GR, CCL, Pres, Temp 26-May- 2008 D C Pds 16528~ressure 8000 12500 Case 7/1/2008 Mem IPROF, Spin, GR, CCL, Pres, Temp 26-May- 2008 ED C Las 17003~ect+on Profile 0 6262 Case 10/10/2008 Depth, Spin, Temp, ILS, GR, CCL og Injection Profile 5 Col 5900 6250 Case 10/10/2008 Injection Pro, MPL, Pres, CCL ,GR, ILS, Temp, Spin 20-Sep-2008 Well Cores/Samples Information: Sample Intervai Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? `~~`V Daily History Received? Y~ Chips Received? ~F~PY Formation Tops ~~ N Analysis `I'-f-M- Received? Comments: ~ . Compliance Reviewed By: _ ~ Date: ~ _ ~ ~ ~~~ ~ ~ To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 ~ RE : Cased Hole/Open Hole/Mechanical Logs and/orTubing Inspection(Caliper/ MTn The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following : BP Exploration (Alaska], Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 and ProActive Diagnostic Services, tnc. Att~:. Robert A. Ricbey 130 West International Airport Road Suite C Anchorage, AK 99518 Fa~c (907) 245-8952 i~ C°_ ~ ~ -09 d v~co ao'~- _ v~~ 1'~ b~ ~ t ~-003 1 j Injection Profile 20Sep-08 MP H-17i 1 Color Log / EDE 5Q-029-23358-00 2j Injection Profile 24Sep-08 MP L-16i ~ Signed : Print Name: ~„/~5 ~~„~ (I~ ,~ ~ ~Wc~ 1 Color Log / EOE 50-029-22566-Q1 Date : - PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 98518 PHONe: (907j245-8951 Fax: (907)245-88952 E-ro~ai~: ~s~sa;~vi3~T?d~~t?,rR~a~~O9~~IJO41.L'.1i3i: WEBSITE.~i~fJVjN.]Ti'.'~93;OY?/~~i";.~~~aia ~j-~ C:\Documents and Settings\Owner~Desktop\Transmit_BP.doc ~ 06/25/08 ~~~Cum6et~g~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth WPII .Inh ~t NO. 4750 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 1 n.. ns~...:..1:.... n_._ Pi-12 11978462 -' _ _ ' _ _" "_"' STATIC PRESS & TEMP ..- j~~ ~` =' •''~ ~..'~ O6/01/08 ..~ 1 ..v.v. vv 1 X-12 11978466 PRODUCTION PROFILE % -• ~~_ ,~ ~ 06/04J08 1 1 G-05 12017499 PRODUCTION PROFILE ~°,~ ~" .--> <~: °',°~. -_-~~ 06/12/08 1 1 E-14A 12034899 SCMT r~+2•~p ~`~ - 06/10/08 1 1 MPH-17 12066526 MEM INJ PROFILE (~ '°~ _ {~ ~, s <""" -,~; 05/26/08 1 1 L-220 11975763 CH EDIT PDC GR (USIT) REVISED CD'S ONLY z, f. r~?, 04/22/08 1 L-220 40016915 OH MWD/LWD EDIT ° _~ a~~~_ f'°'~ y~ 04/18/08 3 ~%1'ti~. .,is~.~ '- , r>3 L-221 40016787 OH MWD/LWD EbIT ~ ~. r- ~ 04/03/08 3 1 01-01C 40015644 OH MWD/LWD EDIT '~~'~~- ~ ~"1 ~'~~ ~°'' ~~ -~a. OS/15/07 2 1 G-19B 40015844 OH MWD/LWD EDIT~;?r;3~i °- ~~ A- '' ~ 7'"' 10/20/07 2 1 X-17 12057619 RST ' t,:~ :~ ;°~ ,~~` '_.1 i 05/24/08 1 1 L3-11 11966254 RST a~"A~r-,~ "?d (<° '" 05/01/08 1 1 Y-36 12014013 RST ' ~" "? ~ - `%? ~ ~' ~-_ C ' 05/11/08 1 1 P2-37A 11216182 ~ ~ _._ .,;._.., , ~~_.~`> MCNL `" ~ 03/17/OS 1 1 05-34A 40016888 OH MWD/LWD EDIT '~*~~-~_. ~°:~- ~~'~:. 04/27/08 2 1 DI FOCC A(~IlI.~A~nn cnn_e oo n~m~r nv a~nu uu. w - -----'--"---" ' -• -'~.....~~...~..~.... . .~..... ~ ~e.v~~ iv. BP Exploration (Alaska) Inc. ~; E ~ Petrr~technical Data Center LR2-1 ~. t, ''' 900 E. Benson Blvd. Anchorage, Alaska 99508 +i" L ~j~~~; Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 40A Anchorage, AK 99503-2 8 ~`; ATTN: Beth ~"~ ~,~ ` i ~ - ; , - Received by: ( j ~ ~ / C`J ~ ~ ~ WELL LOG TRANSMITTAL To: Sta.te of Alaska January 3, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7~' Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evatua.tion Logs: MPH-17 PB1 REDO AK-MW-5042668 1 LDWG formatted CD rom with verification listing. API#: 50-029-23 3 5 8-70 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kaiish 6900 Arctic Blvd. Anchorage, Alaska 99518 ~ 1 ~ ~„~, ~~ ~ ~ ~` ~ ' ~ ~ ~~,~ ~ , , . ~ :~ r~ ~ - Date: _ %E. ~s.; -'`'('~~ ~ ~ , .:;~ .. ~v ~~~ ~ . _ r~. , . .. BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 / Signed: U'~' C 2~~~7~~ ~ tS83~ • ~ To: State of Alaska WELL LOG TRANSMITTAL Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs: MPH-17+PB1 December 21, 2007 AK-MW-5042668 MPH-17+PB1: Digital Log Images: 50-029-23358-00,70 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO TRE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 ~ ~ f.' ~{ ~ ~ ~ ~ ~ ~ 1~ _. ~ .)~'; ~ ~= ~ Y Dat~'.ayr": ~, ~ ~i~(~i .,-„ ~ ,xc ri ;'~J~~-s~ ~~,;~;~~ ~,~ ~~R , BP Exploration (Alaska) Inc. Petro-technical Data. Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Signed: ~ ~~.c a o~ -o~ ~ r s-~° ~s s • WELL LOG TRANSMITTAL To: State of Alaska December 12, 2007 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7~' Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Fortnation Evaluation Logs: MPH-17 AK-MW-5042668 1 LDWG formatted CD rom with verification listing. API# : 5 0-029-23 3 5 8-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 ~ ~~ ~ ~~ ~ ~ ~~.-' ~~. ~' .~.,,, ~ Date ~" " ~ ~`~~'~ ~i,~.~, , , . H~ ~ . ,_ BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 Signed: ~ v-~ ~ a ~~ - a~~ ~ ~~~03 • . WELL LOG TRANSMITTAL To: State of Alaska December 12, 2007 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs: MPH-17 PB1 AK-MW-5042668 1 LDWG formatted CD rom with verification listing. API#: 50-029-23358-70 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services BP Exploration (Alaska) Inc. Attn: Rob Kalish Petrotechnical Data Center MB33 6900 Arctic Blvd. 900 E. Benson Blvd. Anchorage, Alaska 99518 Anchorage, Alaska 99508 ~. :~ ~~=~ ,~ ~~ :. .~ ~ ~` ; ~.T ;,~- _ ~,3 '~ ~ ~ ~ ~ ~r, ~ ~ Date: Signed: ~_~~ ;°~ ~, , _,.~~. ~ ~~~~<,~° ~" 3 ,,:vt~,~ ~ a u~+9 ': ~' , . . : a''~v ~i ~ ~=~~ crr._C ~a~ - o~ ~ 09/24/07 ~ ~ ~~~~~~~~~ NO. 4414 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West lth Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Well Job # Log Description Date BL Color CD 09-25 11695072 LDL ,,;L <.-p 08/17/07 1 L-04 11661166 SCMT ° 08/25/07 1 15-266 11661165 MEM PROD PROFILE 08l23/07 1 02-128 17628789 MEM PROD PROFILE (`j - OSl20J07 1 02-11A 11428266 MCNL ~ ~ / t 10/03/06 1 1 18-24AL2 11209597 MCNL ~~ J` (p `a 03/23/06 1 1 14-07 11637334 RST ( - / ~ 05/08/07 1 1 B-14 11637349 RST ~- /~/ 07/04/07 1 1 Z-08A 71630483 RST - t O6I21/07 1 1 Z-46 40012671 OH EDIT MWD/LWD a - ~ j~< 12/12/05 2 1 Z-46A 40012671 OH EDIT MWD/LWD #~ -- 01/03/06 2 1 E-37A 10928640 MCNL a p5 --Of~ ~/ O6/14/05 1 1 B-34 11594510 RST u q- ~ c O6/14/07 1 1 MPH-17 11813063 CBUUSIT (PDC) CH EDIT ~(~'~ -p(a 1 S 5" 07/21/07 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 ~~-~y~ ~ ° ~5 ; x~ }f ~ ~1; 900 E. Benson Bivd. ~~~ ~ e3 ~ ~i~„ r~ \ ~ ~-~ ; Anchorage,Alaska 99508 Date Delivered: `~~u~-V ~=~ `?, U ~~~ ~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-28 8 ATTN: Beth Received by: ~ ~-- !~9 '~ Bha?: V~IS ~ d. ~A~;:. t c°Itl,.. r:.°1t11YP4S~.'7.3&Lfili /~7 ~ElS~~lt)1 ~:,ti; Page 1 of 1 ~ ~ ~- .~ ~~~~ Davies, Stephen F (DOA) From: Hubble, Terrie L (Terrie.Hubble@bp.com] Sent: Monday, September 24, 2007 12:12 PM To: Davies, Stephen F (DOA) Cc: Stewman, Sondra D Subject: MPH-17 / PTD # 207-Q66 H i Steve, Please reference the following well: Weli Name: MPH-17 Perm it #: 207-066 API #: 50-Q29-23358-00-00 Top Perf MD: 7315" Bottom Perf MD: 8295' This well began Injection on September 20, 2007 Method of Operations is: Water Injection 9/24/2007 ~ ~ ~.~~,~ ~~~~~vE~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION AUG 1 6 2p07 WELL COMPLETION OR RECOMPLETION REPORT AND LO~~~^ ka ~~i & Gas Cans. C ommission ._ , 1a. Well Status: ^ Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended 2onnc z5.~os zoa~c zs.,~o ^ GINJ ~ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1b. Well Class: ^ Development ^ Exploratory ~ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Abar~/f 7/28/2007 ~~`~~ ~6~ 12. Permit to Dri!! Number 207-066 - 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 07/01/2007 - 13. API Number 50-029-23358-00-00 ' 4a. Location of Well (Governmental Section): Surtace: ' ' 7. Date T.D. Reached 7/17/2007 14. Well Name and Number: MPH-17 ' 2282 FNL, 3994 FEL, SEC. 34, T13N, R10E, UM Top of Productive Horizon: 701' FNL, 238' FEL, SEC. 02, T12N, R10E, UM 8. KB (ft above MSL): 69.80 ' Ground (ft MSL): 35.7 15. Field / Pool(s}: ~ Milne Point Unit / Schrader Bluff Total Depth: 52' FNL, 2388' FEL, SEC. 11, T12N, R10E, UM 9. Plug Back Depth (MD+ND) 12550 - 4154 - 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 556649 y- 6010149 Zone- ASP4 10. Total Depth (MD+ND) _ 12550 ~ 4154 16. Property Designation: ADL 375132 TPI: x- 560436 y_ 6006480 Zone- ASP4 Total Depth: x- 558326 y- 6001833 Zone- ASP4 11. SSSV DeN A(MD+~/D) 17. Land Use Permit: 18. Directional Survey ^ Yes ^ No Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1863' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): MWD, GR, RES, PHOTO GYRO, NEU/DEN, IFR/CASANDRA, PWD, SCMT 22. CASING, LINER AND CEMENTING RECORD C/SSING ~~~NG DEPTH MD SETTING D EPTH ND ~ j~~E . AMp~WT ; J i WT. PER FT, GRADE TOP BOTTOM ' TOP '; BOTTOM StZE CEMENTING RECORD ' PULLED „` 20" 92# H-40 Surface 112' Surface 112' 42" 260 sx Arctic Set A rox. 9-5/8" 40# L-80 Surface 4799' Surface 3077' 12-1l4" 393 sx AS Lite 560 Crete 7" 26# L-80 urfa e 8694' Surface 4166' 8- /4" 152 Crete 220 sx Class'G" 3-1/2" 9.2# L-80 8068' 12484' 4112' 4159' 6-1/4" Uncemented Sand Screen Liner 23. Open to production or inject ion? ~ Yes ^ No 24. : ` Tua~N~ Reco~us ~~~ If Yes, Iist each i (MD+TVD of Top & Bottom; Pe nterval open rforation S~ze and Number): Size DePTr+ SeT MD PACKER SET MD 4-1/2" Diameter, 5 SPF 3-1/2" Sand Screens 3-1/2", 9.2#, L-80 / TCII 8101' 6028' MD ND MD TVD 7315' - 7415' 4077' - 4081' 8227' - 12484' 4121' - 4159' 25. ' ACro, FRACTURE, C~MENr Sc~ueEZ~,. E7c. 7525~ - 76Z5~ 4OH5~ - 4O$H~ DEPTH INTERVAL MD AMOUNT H~ KIND OF MATERIAL USED 8195' - 8295' 4119' - 4127' Freeze Protected with 91 Bbls Diesel Z6. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date of Test: Hours Tested: PROOUCrioN FoR TEST PERlOD OIL-BBI: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing Pf@SS. Casing Press: Cn~cuu~re~ 24-HOUR RATE~ OIL-BBL: GAS-MCF: WATER-BBI: OIL GRAVITY-API ~CORR~: Z7. CORE DATA Conventional Core(s) Acquired? ^ Yes ~ No Sidewal l Core s Ac uired? ^ Yes ~ No If Yes to either question, list formations and intervals cored (MD+ND of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. COMPLE~ION None S~L AUG 2~ 20D7 ~~~ :~~ Y ~~ Form 10-407 Revised 02/200/ ~ ~ ~ ~' ~~ ~ ~ CONTINUED ON REVERSE SIDE 1~-~ ( ~"1 ~ ~~~/~ / ~ ~ -~ r `~ - - Z V ZS. rEOLOGIC.MARKERS ~LIST ALL FORMATIONS AND RS ENCOUNTERED~: Z9. FORMATION TESTS NAME MD ND Well Tested . ^ Yes ~ No Permafrost Top SurfaCe SurfaCe If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base 2165' 1863' detailed test information per 20 AAC 25.071. TUZC 5780' 3543' MA 6309' 3785' None MB1 6350' 3802' M62 6498' 3860' NA 7042' 4044' N B 7194' 4067' NC 7859' 4100' NE 8200' 4120' NF 8660' 4163' LANDING 9310' 4194' REVERT #1 10014' 4181' INVERT #2 10950' 4194' TOP OF OA 12520' 4156' Formation at Total Depth (Name): Schrader Bluff 12550' 4154' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys and a Leak-Off Test Summary. 31. I hereby certify fhat the foregoing is true and correct to the best of my knowledge. Signed Sondra f wma ~ Title Technical Assistant Date ~'` +"{ -(~~ MPH-17 207-066 Prepared By NameMumber. Sondra Stewman, 564-4750 Well Number Drilling Engineer: Dave Johnson, 564-4171 _ Permit No. / A roval No. INSTRUCTIONS GeNewu: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITeM 4b: TPI (Top of Producing Interval). Ire~ 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately p~oduced, showing the data pertinent to such interval). ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Irea~ 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only TREE: 3-1?8" - SM PMC WELLHEAD: 1 T' x 3-1/8" 5M FM n 5 Tub Hgr. 11" x 3-1,8° TC-II T&B 3" CIW-H BPVT Conductor 112' KOP @ 200` Angle passes 44° @ 1800` Max Angle in Tbg = 65° @ 3041 ` Angle thru liner = 86-93.5' 9- 5/8" 40# L-$0 BTC Cs9 4,799' 301~1 ~'~ 3.5" 9.2 #/ft L-80 TC-I I Tubing ( Drift id = 2.867, cap =.0087 bpi 3.5" Reinject Screens ( Drift id = 2.897 ) 7" 26 ppf, L-80, TC-II casing (driftiD=6.151") Schrader NB F 8,066` Baker Locator 8,101' Seal Assy bc Schrader NE F 7° 26# L-80 TC-II Csg 8,6~. r-1~ bfo~ k v Perforation Summary Size SPF Interval (TVD) NB Sand 4.5" 5 7315` - 7415' 4077' - 4081' NB Sand 4.5" 5 7525' - 7625' 4085' - 4088' NE Sand 4.5" 5 8195` - 8295' 4120' - 4127' SLB HSD 5SPF Q 72 degree phasing ' ~115~,` -~ v c~ ', 3.5" 9.2# L-80 IBT-M 12,4 Screened Liner DATE REV. BY COMMENTS ', 07/30/07 DAJ & PLH Drill & Complete - Doyon 14 ~ Orig. KB Elev. = 71.9' (D-14) Orig. GL Elev. = 38.10' (D-14) DF to LDS = 30.60' (D-14) 3.5" HES X-Nipple 2.813" 3,024` I 3.5" MMG Mandrel 3,077' I IES X-Nipple 2.813° 5,973` 3.5" Baker S-3 packer. 6,028' 4MG Mandrel 6,054` ~MG Mandrel 6,115` iES X-Nipple 2.813" 6,176' .5" Baker ZXP Packer .5" Baker HMC Hanger 8,068` ~I-bore extension TAM FreeCap Swell Packers with X Nipples and 3.5" Resinject Screens See Page 2 For Liner Detail Effective Total Depth 12,523' ~ MILNE POIN7 UNIT WELL MPH-17 API NO: 50-029-23358-0000 ~", ~, ct~ ~Y~ 3-112" Liner~ Pa e Tw~ Schrader NE Perfs 8195' - 8295' 7" 26# L-80 TC-II Csg 8,694` 3.5` 9.2# L-80 !BT-M With Reslnject Screens ~7 7 Effective Total Depth 12523` ~ DATE REV. BY COMMENTS 7/30/07 DAJ & PLH Drill & Complete - Doyon 14 BP EXPL(~7RAT10N ~ 8,068' 7" x 3.5" Baker ZXP Packer 7" x 3.5" Baker HMC Hanger w/ seal-bore extension 3.5" X-Nipple 3.5" Resinject Screen TAM FreeCap Swell Packer 3.5" X-Nipple TAM FreeCap Swell Packer 3.5" X-Nipple TAM FreeCap Sweli Packer 3.5" X-Nipple 3.5" Resinject Screen 3.5" Resinject Screen 3.5" Resinject Screen TAM FreeCap Swell Packer 3.5" X-Nipple TAM FreeCap Swell Packer 3.5" X-Nipple 3.5" Resinject Screen 3.5" Res+nject Screen 3.5" Resinject Screen TAM FreeCap Swell Packer 3.5" X-Nipple TAM FreeCap Swell Packer 3.5" X-Nipple 3.5" Resinject Screen 3.5" Resinject Screen 3.5" Resinject Screen 3.5" Resinject Screen TAM FreeCap Swell Packer 3.5" X-Nipple 3.5" Resinject Screen 3.5" Resinject Screen 3.5" Resinject Screen 3.5" Resinject Screen 3.5" Bullnose 8,128` 8,227' 8,483' 8,530' 8,703' 8, 751 ` 8, 877' 8, 925' 9,095` 9, 383' 9,607' 9,766` 9,815' 10,020' 10,067` 10,207' 10, 398' ' 10,577` 10,587' I 10,633` ' 10,901' 10,947` ~ 11,118` ~! 11,310' i 11,502` ', 11,629' , 11,658' 11,707` , 11, 846' 12,039' 12,230` ~~ 12,453` 12,484` MiLNE POINT fJNIT WELL MPH-17 API NO; 5Q-029-23358-0000 ~ ~~ ~: ~~ G'`~5~~ -~'V~ , ~ ~ BP AMERICA Page 1 of 12 !Operations Summary Reporrt Legal Well Name: MPH-17 Common Well Name: MPH-17 Spud Date: 7/1/2007 Event Name: DRILL+COMPLETE Start: 6/30/2007 End: 7/28/2007 Contractor Name: DOYON DRILLING INC. Rig Release: 7/28/2007 Rig Name: DOYON 14 Rig Number: {, Date From - To Hours Ta~k Cade NPT Phase ! Description c~f Qperatians 6/30/2007 00:00 - 05:00 5.00 MOB i ~ P ~ PRE -- Prepare rig for moving - Skid rig floor from drlg position to { ~ move position - Move off well 05:00 - 06:30 1.50 MOB P i PRE Remove cellar doors - Install back / front boosters 06:30 - 08:00 1.50 MOB P PRE Move rig from MPS on matt boards U main road 08:00 - 12:00 4.00 MOB P PRE Cont. rig move to Milne Point H-pad 12:00 - 15:00 3.00 RIGU P PRE i Move rig on pad - Remove rear / front boosters - Install rear doors - Spot rig over conductor - Spot rockwasher and berm I up same - Skid rig floor into drill position - Hook up service I lines - Prep. mud pits / take on water in mud pits , 15:00 - 22:00 7.00 RIGU P ~ SURF Accept rig @ 15:00 hrs - Install Diverter / Knife valve / Hydrill / Riser / Flowline 22:00 - 23:00 1.00 RIGU P SURF Mix spud mud while loading 4" drill pipe in pipe shed - Perform derrick inspection - Clear and clean up rig floor 23:00 - 00:00 1.00 RIGU P SURF PU 4" drill pipe 1x1 f/ pipe shed and std back in derrick 7/1/2007 00:00 - 04:30 4.50 RIGU P SURF Cont. PU 4" driil pipe 1x1 f/ pipe shed 1 153 jts total - Load and strap BHA in pipe shed 04:30 - 05:00 0.50 DIVRTR P ( ~ SURF Function test diverter system and perform accumulator test, ~ witnessed by WSL - John Crisp w/ AOGCC wavied witness of tests 05:00 - 10:30 5.50 DRILL P SURF PU 5" HWDP 1x1 f/ pipe shed - Std back in derrick - Load and , Strap BHA - Mobilize to rig floor 10:30 - 11:00 0.50 DRILL P SURF i MU 1 std of flex DCs - Std back in derrick - Calibrate and test ~ ng gas detectors - Calibrate mud pit probes 11:00 - 12:00 1.00 DRILL P ~ SURF PJSM - RU Sperry Gyro tools - Hang sheave in derrick - Pre-Spud meeting w/ rig crew 12:00 - 13:00 1.00 DRILL P SURF MU BHA - Bit / Motor / Float sub / Stabilizer / Xo - Pre-Spud meeting w/ rig crew - Fill hole w/ spud mud - Check f/ leaks (None) 13:00 - 15:30 2.50 DRiLL P SURF Drili 12 1/4" hole f/ 112' to 222' w/ HWDP _ 15:30 - 17:00 1.50 DRILL P ~ SURF POH w/ HWDP - Std back in derrick 17:00 - 18:00 1.00 DRILL N WAIT ~ SURF Wait on Sperry crossover sub to arrive location 18:00 - 19:00 1.00 DRILL P ~ SURF MU MWD tools - Orient UBHO sub w/ motor / Flex drill collars / Power up and Initialize MWD 19:00 - 19:30 0.50 DRILL P SURF RIH and wash to bottom w/ std HWDP 19:30 - 21:30 2.00 DRILL P SURF Directional Drill 12 1/4" hole f/ 222' to 269' - Gyro survey @ 100' - 169' (Gyro survey every std) 21:30 - 23:30 2.00 DRILL P ~ ~ SURF Directional Drill 12/14" hole f/ 220' to 453' - Gyro survey @ 349' I (survey indicated 100 degree change in direction) 23:30 - 00:00 0.50 DRILL N HMAN SURF POH w/ HWDP to UBHO Sub - Sub orientation off 150 degrees (mistakenly madeup up on wrong scribe mark) 7/2/2007 00:00 - 19:00 19.00 REMCM N HMAN SURF Stand back BHA and MWD tools in derrick - Power down MWD battery pack - Mobilize 4" mule shoe and XO to rig floor - W ait on cement / SLB equipment to arrive location 19:00 - 19:30 0.50 REMCM N ~ HMAN SURF MU mule shoe / XO - RIH w/ 4" drill pipe to 453' - Break circ w/ 2 bpm @ 220 psi 19:30 - 20:00 0.50 REMCM N HMAN ~ SURF Break circ. w/ 2 bpm @ 220 psi - Circulate bttms up w/ 6 bpm @ 490 psi - Pump and spot 40 bbls treated mud in open hole 20:00 - 21:30 1.50 REMCM N HMAN SURF Give to Schlumberger Pump 5 bbls water 7est iines to 3000 psi Pump 5 bbls water Mix & Pump 80 bbls AS1 @ 15.7 ppg cement / yield .93 / 1 500sx Printed: 8/2/2007 1:50:04 PM - i ~ BP AMERICA Page ~ ofi 12 'Qpera~ians Summary Report Legal Well Name: MPH-17 Common Well Name: MPH-17 Spud Date: 7/1/2007 Event Name: DRILL+COMPLETE Start: 6/30/2007 End: 7/28/2007 Contractor Name: DOYON DRILLING fNC. Rig Release: 7/28/2007 Rig Name: DOYON 14 Rig Number: _ Date From - To Hours Task Gode NPT Phase - Description of C7peration~ ~ 7/2/2007 1 20:00 - 21:30 1.50 REMCM N HMAN SURF Pump 5 bbls water flush out lines i CIP @ 21:30 hrs ; 21:30 - 22:30 1.00 REMCM N HMAN SURF POH w/ drill pipe f/ 453' to 140' - Break circ - Circulate cement ~ to surface w/ treated mud (approx. 5 bbls of good cement circ to surface) 22:30 - 23:00 0.50 REMCM N HMAN SURF ~ RIH - Wash through all driU pipe used in cement operation / Std ; back in derrick 23:00 - 23:30 0.50 REMCM N HMAN SURF ; Ml1 stack washer - Wash out and function Annular - Circ and ~ washout cement line / flowline / dump line 23:00 - 00:00 1.00 REMCM N HMAN SURF Wait on cement to gain compressive strength 7/3/2007 00:00 - 03:00 3.00 REMCM N HMAN SURF PJSM - Mobilize Gyro tools to rig floor - Hang Gyro sheave in derrick - Upload MW D- Orient motor w/ UBHO sub ; 03:00 - 03:30 0.50 REMCM N HMAN SURF RIH to 86' - Break circ - Wash down f/ 86' to 150' w/ 2 bpm @ ! 85 psi (no indication of cement) f 03:30 - 04:30 1.00 REMCM N HMAN SURF Pull up hole to 86' - CBU w/ 2 bpm @ 90 psi - Wait on cement to firm 04:30 - 05:30 1.00 REMCM N HMAN SURF Break circ - Wash down f/ 150' to 165' looking for firm cement ~ @ 3 bpm @ 270 psi. Circulate 2x BU 05:30 - 06:30 1.00 DRILL N HMAN SURF Drill f/ 165' to 268' 06:30 - 07:30 1.00 DRILL N HMAN SURF POOH, rack back 2 stands of HWDP and PU 1 stand of flex cotlars 07:30 - 09:30 2.00 DRILL N ' HMAN SURF Pump sweep - Circulate and displace out contaminated mud ~ 09:30 - 12:00 2.50 ORILL N HMAN SURF Dir. drill f! 268' to 453'. 350 gpm @ 800 psi. PUW 77k - SOW ' 77k ~ 12:00 - 00:00 12.00 DRILL P SURF Dir. drill f/ 453' to 1,140'. Wireline Gyro on every stand to 716'. R/D Gyra 454 gpm @ 1300 psi. PUW 96k - SOW 90k - ROTW 94k. TQ on 4k - TQ off 1 k. 80 RPM. 7/4/2007 00:00 - 12:00 12.00 DRILL P SURF Dir. drill f/ 1,140' to 1,950'. 450 gpm @ 1560 psi. PUW 105k - SOW 95k. TQ on 6k - TQ off 3k 12:00 - 17:00 5.00 DRILL P SURF Dir. drill f/ 1,950' to 2,522'. Encounter hydrates @ 1,980' (1,751' TVD) 17:00 - 18:00 1.00 DRILL P SURF Circulate hole clean. Check for flow 18:00 - 19:30 1.50 DRILL P SURF POOH f/ 2,522' to 723' (HWDP). Check well for flow ~ 19:30 - 20:30 1.00 DRILL P SURF RIH back to 2,522' (as precaution, wash last stand to bottom) 20:30 - 00:00 3.50 DRILL P SURF Dir. drill f/ 2,522' to 2,900'. 500 gpm @ 2330 psi. PUW 105k - , SOW 80k - ROTW 93k. TQ on 6k - TQ off 4k 7/5/2007 00:00 - 12:00 12.00 DRILL P SURF I Dir. drill f/ 2,900' to 4,134'. 500 gpm @ 2,790 psi. 80 RPM. TQ on 7k - TQ off 4k 12:00 - 20:30 8.50 DR1LL P SURF Dir. drill f/ 4,134' to 4,810' (casing point). 500 gpm @ 3,080 psi. 80 RPM. PUW 128k - SOW 85k - ROTW 105k. TQ on 7k - TQ off 6k 20:30 - 22:30 2.00 DRILL P SURF Circulate 2x BU. Check well for flow. 22:30 - 00:00 1.50 DRILL P SURF Pump out of the hole f/ 4,810' to 3,560' (wiper trip) 7/6/2007 00:00 - 03:00 3.00 DRILL P SURF Cont. pumping out of the hole f/ 3,560' to 723' (wiper trip). i Spots @ 1,260' & 820'. Circulate until clean (clay and mud I cake). Check well for flow. ~ 03:00 - 05:00 2.~0 DRILL P SURF 4 R{H f/ 723' to 4,810'. As precaution wash last stand to bottom. ; 05:00 - 08:30 3.50 CASE P I SURF Circulate 3x BU. Check well for flow ~ 08:30 - 11:30 3.00 CASE P SURF Pump out of the hole f/ 4,810' to 723' ~ 11:30 - 12:00 0.50 CASE P SURF Stand back HWDP I 12:00 - 15:00 3.00 CASE P ~ SURF LD flex collars - Download and LD MWD - LD motor & bit (15:00 - 16:00 1.00 CASE P ( SURF Clear rig floor from tools and clean Printed: 8/2/2007 1:50:04 PM ~ ~ ~ BP AMERICA Page 3 ofi -12' ~perations Sc~mFnary Report Legal Well Name: MPH-17 Common Well Name: MPH-17 Spud Date: 7/1/2007 Event Name: DRILL+COMPLETE Start: 6/30/2007 End: 7/28/2007 Contractor Name: DOYON DRILLING INC. Rig Release: 7/28/2007 Rig Name: DOYON 14 Rig Number: ' Date From - Ta Hours Task Cade NPT Phase ' Description of Qperations 7/6/2007 16:00 - 18:00 2.00 CASE P SURF RU to run 9-5/8" casing: change bales, PU casing tongs and equipment. RU Frank's fill up tool 18:00 - 00:00 6.00 CASE P SURF PU and MU shoe track. Circulate and check floats. MU and RIH 9-5/8" L-80 40# BTC casing to 4,500'. install 55 straight blade centralizers (2/jtt on joints 1, 2& 3- 1/jtt on joints 4-52). i Install TAM collar between joints 93 & 94. Install bow springs centralizers at 10' above and 10' below TAM collar. 7/7/2007 ~~ 00:00 - 00:30 0.50 CASE P SURF Finish RIH 9-5/8" L-80 40# BTC casing to 4,798'. Land casing on landing ring. Total jtts run: 117. Float shoe @ 4,798' - Float collar Q 4,714' - TAM collar @ 1,015' 00:30 - 02:30 2.00 CASE P SURF Stage pumps to 6 bpm @ 380 psi. Circulate 2 casing volumes ' w/ Frank's fill up tooi and condition mud. 02:30 - 03:00 0.50 CEMT P SURF RD Franks' fifl up tool. RU cement head and cement lines. 03:00 - 05:00 2.00 CEMT P SURF Cont. circulating and conditioning mud in preparation for cement job. Hold PJSM for cement job while circulating. 05:00 - 09:00 4.00 CEMT P SURF Give to Schlumberger. - Pump 5 bls of water. Test lines to 3,500 psi. Pump 5 bbls of i water - Pump 70 bbls of 10.5 ppg Mud Push - Drop bottom plug. Pump 32~ bbls of 10.7 ppg lead cement followed by 220 bbls of 12.5 ppg tail cement. ~ - Kick top plug w/ 5 bbls of water. Switch to rig pumps and displace cement @ 5-6 bpm. When tail cement entered open hole started loosing circulation. Lost 90 bbls of cement to formation. 200 bbls of lead cement returned to surface. Bump plug w/ 2,200 psi (1,500 psi over final circulating ~ pressure). Hold 2,200 psi x 10 min. Bleed off and check floats. 09:00 - 11:00 2.00 CEMT P SURF LD cement head and landing joint. Flush diverter and lines. Function diverter and flush again. 11:00 - 12:00 1.00 DIVRTR P SURF ND diverter 12:00 - 14:00 2.00 WHSUR P SURF Finished ND diverter. NU FMC speed casing head and tubing spool. Test to 1,000 psi. 14:00 - 18:00 4.00 BOPSU P SURF NU BOP, riser and flow iine. Change out choke hose spool and MU. RU testing equipment SIM OPS: clean pits and rock washer. Clear floor of casing equipment and RD long bales. Work on drag chain. Load pipe shed w/ 135 jtts of 4" DP. 18:00 - 22:00 4.00 BOPSU P SURF PJSM - Test BOP and related equipment as per BP / AOGCC regulations. Test to 250 psi low - 3,000 psi high (annular preventer to 250 psi low - 2,500 psi high) w/ 4" test joint. Perform koomey test. Record test on chart. BOP test witnessed by WSL (X. Chacin) and Tourpusher (H. ~ Gochenauer). Chuck Scheve, AOGCC Rep, waived witness of test. 22:00 - 23:00 1.00 CASE P SURF RD testing equipment. RU bales and elevators. Prep. rig floor to PU 4" DP. MU mule shoe 23:00 - 00:00 1.00 CASE P SURF PU and RIH 4" DP 1x1 7/8/2007 00:00 - 03:00 3.00 CASE P SURF Cont. PU and RIH 4" DP ix1. Total jtts: 135 03:00 - 04:30 1.50 CASE P SURF Cut and slip drilling line. Service top drive. Circulate 1.5x drill pipe volume Printed: 8/2/2007 1:50:04 PM ~ ~ BP AIIIIERICA Page 4 c~f 12 Opera~tic~ns Surr~m~ry Report Legal Well Name: MPH-17 Common Welf Name: MPH-17 Spud Date: 7/1/2007 Event Name: DRILL+COMPLETE Start: 6/30/2007 End: 7/28/2007 Contractor Name: DOYON DRILLING INC. Rig Release: 7/28/2007 Rig Name: DOYON 14 Rig Number: _ I_' _'I.. I _' _ I_ . i-=--~ -- I __ . 7/8/2007 04:30 - 05:30 1.00 j CASE ~ P SURF 05:3~ - 07:00 1.50 ~ CASE P SURF 07:00 - 11:30 4.50 CASE P SURF 11:30 - 12:00 ~ 0.50 CASE P SURF I 12:00 - 14:00 2.00 CASE P SURF I ~ i 14:00 - 16:00 2.00 DRILL P SURF 16:00 - 17:00 1.00 DRILL P SURF 17:00 - 18:00 1.00 DRILL P SURF 18:00 - 00:00 7/9/2007 00:00 - 12:00 12:00 - 19:00 i 1 g:00 - 20:30 20:30 - 22:30 22:30 - 23:30 23:30 - OQ:OQ 7/10/2007 I00:00 - 12:00 12:00 - 00:00 7/11/2007 100:00 - 12:00 12:00 - 14:30 14:30 - 16:30 16:30 - 20:30 20:30 - 21:00 21:00 - 22:30 7/12/2007 22:30 - 00:00 00:00 - 00:30 00:30 - 04:00 04:00 - 05:00 05:00 - 06:00 06:00 - 08:00 08:00 - 12:00 6.00 DRILL ~ P I 12.00 DRILL I P ~ 7.00 DRILL I P 1.50 DRII.L P 2.00 DRILL P 1.00 DRILL P 0.50 DRILL P 12.001 DRILL I P 12.00 DRILL j P I 12.00 DRILL P 2.50 DRILL P 2.00 DRILL P 4.00 DRIL~ P 0.50 DRILL P 1.50 DRILL P 1.50 CASE P 0.50 CASE P 3.50 CASE P i.00 CASE P 1.00 CASE P 2.OOI CASE P 4.00 I CASE P INT1 INT1 INT1 INT1 INTt INT1 INT1 INT1 INT1 INTi INT1 INT1 INT1 INT1 INT1 INT1 INTi INT1 INT1 INT1 INTi INT1 Break off top drive. Mud out of balance. Circulate to balance out mud POOH and stand back 4" DP Clear rig floor - Mobilize BHA to rig floor - MU BHA and orient - Up load MWD and load sources Test MWD. Cont. MU BHA MU HWDP. RIH w/ 4" DP to 4,714'. Tag float collar. Drill out float collar, shoe trac and float shoe. Ciean rat hole to 4,810'. Drill 20' of new hole to 4,830'. Correlate MWD Circulate and displace spud mud for 8.8 ppg LSND mud. MAD pass while circulating. Pull back to the shoe RU testing equipment. Perform FIT to 11.5 ppg EMW (MW=8.8 ppg ; TVD=3,076'; Test pressure=430 psi). Record test on chart. RD testing equipment. Dir. drill f/ 4,830' to 5,394'. 440 gpm @ 1640 psi. 75 RPM. PUW 143k - SOW 82k - ROTW 106k. TQ on 8k - TQ off 7k. Dir. drill f/ 5,394' to 6,437'. 450 gpm @ 2,000 psi. 75 RPM. PUW 155k - SOW 83k - ROTW 112k. TQ on 8k - TQ off 7k Dir. drill f/ 6,437' to 7,002'. 450 gpm @ 2,000 psi. 75 RPM. PUW 150k - SOW 83k - ROTW 115k. TQ on 9k - TQ off 9k. MAD passing every slide intervai Circulate 2x BU. Check well for fiow. Pump out of the hole f/ 7,002' to 9-5/8" shoe Circulate 1.5x BU. Check well for flow. RIH fl 9-5/8" shoe to 7,002'. As precaution, wash last stand to bottom Dir. drill f/ 7,002' to 7,479'. MAD passing every slide interval. 504 gpm @ 2170 psi. 80 RPM. PUW 135k - SOW 83k - ROTW 106k. TQ on 8k - TQ off 7k Dir. drill f/ 7,479' to 7,968'. MAD passing every slide interval. Taking surveys every +/-45'. 504 gpm @ 2570 psi. 80 RPM. PUW 121 k- SOW 85k - ROTW 102k. TQ on 6k - TQ off 5k Dir. drill f/ 7,968' to 8,585'. MAD passing every slide interval. Taking surveys every +/-45'. 500 gpm @ 2800 psi. 80 RPM. PUW 125k - SOW 85k - ROTW 108k. TQ on 8k - TQ off 5k Dir. drill f/ 8,585' to 8,700' (casing point). MAD passing every slide interval. Taking surveys every +/-45'. 500 gpm @ 2800 psi. 80 RPM. PUW 125k - SOW 85k - ROTW 105k. TQ on 8k - TQ off 6k Circulate 3x BU Pump out of the hole f/ 8,700' to 9-5/8" shoe. Work tight spots f/ 8,332' to 8,237' and f/ 7,669' to 7,195'. Circulate BU at 9-5/8" shoe RIH f/ 9-5/8" shoe to 8,700' Wash last stand to bottom. No tight spots. Circulate 2x BU. Finished circulating hole clean Pump out of the hole f/ 8,700' to 9-5/8" shoe. Left lubricant pill in open hole. Circulate BU at 9-5/8" shoe. Cut and slip drilling line POOH 4" DP f/ 9-5/8" shoe to BHA LD BHA. Remove sources from MWD and down load MWQ Printed: 8/2/2007 1:50:04 PM ~ ~ ;BP AMERIGA Page 5 of t2'' Opera#ions S~mnnarr~ Report Legal Well Name: MPH-17 Common Well Name: MPH-17 Event Name: DRILL+COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 _ ;k Code i NPT ; i 7/12/2007 12:00 - 13:30 1.50' BOPSUR P 13:30 - 14:30 1.00 BOPSUF~ P Start: 6/30/2007 Rig Release: 7/28i2007 Rig Number: I Spud Date: 7/1/2007 End: 7/28/2007 ~escra~tic~n ui v~erations INT1 INT1 14:30 - 16:30 2.00 CASE P i INTi 16:30 - 23:30 7.00 CASE 'i P I ~ INT1 23:30 - 00:00 0.50 CASE P ~ INT1 7/13/2007 00:00 - 06:30 6.50 CASE P ; ~ INT1 I 06:30 - 07:30 1.00 CASE P ~ INTi 07:30 - 08:00 0.50 CASE i P INT1 08:00 - 10:00 2.00 CASE I P 1NT1 10:00 - 11:00 I 1.001 CEMT I P ; I INT1 11:00 - 12:00 I 1.001 CEMT I P I I INT1 12:00 - 13:00 1.00 CEMT P INT1 13:00 - 14:00 1.00 CEMT P INTi 14:00 - 15:00 1.00 BOPSU P INT1 15:00 - 17:30 2.50 CASE P INTi 17:30 - 19:00 1.50 BOPSUF~ P INT1 19:00 - 19:30 0.50 CASE ~ P INT1 19:30 - 20:30 1.00 BOPSUF~ P INT1 20:30 - 21:30 I 1.001 BOPSUF# P I I INT1 Pull wear bushing. Install test plug. Change upper pipe rams to 7". RU testing equipment. Test upper pipe rams to 250 psi low / 3,000 psi high as per BP/AOGCC regulations. Record test on chart. Test witnessed by WSL (J. Haberthur) and AOGCC Rep. (L. Grimaldi). Rig down testing equipment and pull test plug. RU to run 7" casing: change bales, MU FRank's fill up tool, RU casing equipment and tongs Run 7" L-80 26# TC-II casing f/ surface to 4,772' as per program. Turn torque connections. Install 85 straight biade centralizers ( 2/jtt on joints 1-3, 1/jtt on top half of joints 4-82 with stop ring in middle of joint). Install 25 spiral centralizers ( 1/jtt on bottom half of joints 4-28). Circulate BU before running in open hole Cont. running 7" L-80 26# TC-II casing to 8650'. Torque turn connections. Break circulation w/ 2.5 bpm 675 psi Wash last joint to bottom - Stage pumps up slowiy to 5 bpm 690 psi - Circulate casing volume - Work pipe w/ 15-20' strokes - PUW 180k - SOW 90k PJSM - RD Franks Filiup Tool - RU Dowell cement head Break circulation w/ 2 bpm - Slowly stage up to 5 bpm 500 psi - Circulate and condition mud for cement job - Work pipe 15-20' strokes - PUW 180k, SOW 90k - Hold PJSM with alI involved with cement operations Turn over to Schlumberger - Pump 5 bbls H20 - Test lines to 3000 psi - Pump 50 bbls Mud Push ai 11.0 ppg w/ 4 bpm 300 psi - Drop bottom plug - Pump lead, 61 bbls 12.5 ppg Crete w/ 5 bpm 200 psi - Pump tail, 45.5 bbis 15.8 ppg class "G" w/ GasBlok w/ 5 bpm 70 psi - Drop top plug and kick out w/ 5 bbls H20 Displace w/ Rig pump using driiling mud at 9.3 ppg w/ 5 bpm 220 psi - Bump piug w/ 3212 strokes (324 bbls) and 2500 psi - Hold pressure for 10 min. and record on chart - OK - Reciprocate wl 20' strokes through out cement and displacement - Full returns throughout job - CIP at 1200 hrs. Close annular - Pump down to clear 9 5/8" x 7" annulus w/ 50 bbls 9.3 ppg drilling mud at 3 bpm 1030 psi RD cement head, XO - Cement lines and equipment ND BOP Hang casing on emergency slips w/ 150k indicated weight (100k above blocks weight). Cut casing joint and LD same. Install packoff Float shoe @ 8,694'. Float collar@ 8,609' NU BOP. Test packoff to 4,300 psi x 15 min. Test good. Clear rig floor of casing tools Install test plug. Change upper pipe rams to 2-7/8" x 5" VBR SIM OPS: Little Red pump 70 bbls of diesel down 9-5/8" x 7" annulus (freeze protect) @ 2 bpm - 1550 psi RU testing equipment - Test upper pipe rams to 250 psi low / 3,000 psi high as per BP/AOGCC regulations. Record test on chart. Test witnessed by WSL (X. Chacin) and Tourpusher (T. Shones). Lou Grimaidi, AOGCC Rep, waived witness of test - Printed: 8/2/2007 1:50:04 PM ~ ~ _ __ BP AM'. Legal Well Name: MPH-17 Common Well Name: MPH-17 Event Name: DRILL+COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 ~ ~ ~ ~ 7/13/2007 20:30 - 21:30 1.00 BOPSU P 21:30 - 22:30 1.00 CASE P 22:30 - 00:00 1.50 CASE P 7/14/2007 00:00 - 02:30 2.50 CASE P 02:30 - 03:30 1.00 CASE P 03:30 - 05:30 2.00 CASE P 05:30 - 06:30 1.00 CASE ~ P 06:30 - 07:30 1.00 CASE N 07:30 - 08:30 1.00 CASE P 08:30 - 12:30 4.00 CASE P 12:30 - 13:00 0.50 CASE P 13:00 - 14:00 1.00 DRILL P 14:00 - 15:00 1.00 DRILL P 15:00 - 16:00 1.00 DRILL P 16:00 - 17.30 1.50 DRILL I P 17:30 - 19:00 1.50 DRiLL P 19:00 - 00:00 5.00 DRILL P 7/15/2007 00:00 - 12:00 12.00 DRILL P 12:00 - 22:00 I 10.001 DRILL I P 22:00 - 23:30 1.50 DRILL P I 23:30 - 00:00 0.50 DRILL P , 7/16/2007 00:00 - 01:30 1.50 DRILL P 01:30 - 02:00 0.50 DRILL P 02:00 - 03:30 1.50 DRILL P I 03:30 - 04:30 1.00 DRILL P 04:30 - 12:00 I 7.501 DRILL I P 12:00 - 00:00 I 12.001 DRILL I P ~ 7/17/2007 ~ 00:00 - 14:00 ~ 16.50 ~ DRILL ~ P 14:00 - 15:00 I 1.001 DRILL I P INT1 INT1 INT1 Start: 6/30/2007 Rig Release: 7/28/2007 Rig Number: ~~ ~ ~. PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Spud Date: 7/1 /2007 End: 7/28/2007 RD testing equipment - Pull test plug and install wear bushing. Load 4" HWDP and jars in shed and strap. PU and RIH 4" HWDP and jars 1 x 1 PUandRIH4"DPixi Cont RIH 4" DP 1 x 1. Total jjts run: 96. Circulate 3x string volume POOH and stand back 4" DP, 4" HWDP and jars. PU and MU BHA. Upload MWD - RLL would not test Change out RLL Upload MWD - Surface test w/ 254 gpm 1050 psi - OK - Load sources RIH to 8572' Screw in T.D. - Obtain parameters - Wash down and tag F.C. at 8609' - PUW 130k - SOW 80k - ROW 104k Ciean out F.C., cement and shoe w/ 50 rpm, 6k tq, WOB 5-10k, 180 gpm 1100 psi - Drill 20' new hole to 8720'. Circulate hole clean. RU testing equipment. Perform FIT to 11.5 ppg EMW (MW=9.2 ppg ; ND=4,166'; Test pressure=500 psi). Record test on chart. RD testing equipment. Displace LSND mud to 9.2 ppg solids free Flo-Pro mud as per plan Clean surface equipment and pit #1. Change screens Dir. drill f/ 8,720' to 8,920'. 250 gpm @ 2220 psi. 80 RPM. PUW 150k - SOW 60k - ROTW 96k. TQ on 9k - TQ off 8k. Dir. drill f/ 8,920' to 9,798'. 250 gpm @ 2,000 psi. 80 RPM. PUW 127k - SOW 75k - ROTW 100k. TQ on 5k - TQ off 6k. MAD passing slide intervals. Taking surveys every +/-45'. Dir. drill f/ 9,798' to 10,557'. 250 gpm @ 1,980 psi. 80 RPM. PUW 120k - SOW 75k - ROTW 99k. TQ on 5k - TQ off 6k. MAD passing slide intervals. Taking surveys every +/-45'. Circulate 2x BU Check wel{ for flow. Pump out of the hole Cont. pumping out of the hole to 7" shoe Circulate BU at 7" shoe Cut and slip drilling line. Service top drive RIH f/ 7" shoe to 10,182'. Noticed last stand did not dispiace fluid. Slow down tripping speed and check mud level in well - static. MU top drive and wash down slowly to 10,557' w/ full returns. Dir. drill f/ 10,557' to 10,936'. 250 gpm @ 2,020 psi. 80 RPM. PUW 120k - SOW 77k - ROTW 99k. TQ on 4k - TQ off 5k. MAD passing slide intervals. Taking surveys every +1-45'. Dir. drill f/ 10,936' to 11,602'. 250 gpm Q 2,010 psi. 80 RPM. PUW 125k - SOW 70k - ROTW 98k. TQ on 6k - TQ off 5k. MAD passing slide intervals. Taking surveys every +l-45'. Dir. drill f/ 11,602' to 12,457'. MAD passing slide intervals. Taking surveys every +/-45' - ROW 135k - SOW 55k - ROW 98k - WOB 4k - 250 gpm 2250 psi off, 2370 on - Tq off 9k on 10k Circulate and condition mud w/ "Lube-tex" - R&R DP - 250 gpm 2300 psi e NPT Ph -~- ~ INT1 I i INT1 ~ IINTI i i INT1 I INT1 i INT1 ~ INT1 DFAL INT1 INT1 INT1 INT1 Printed: 8/2/2007 1:50:04 PM ~ ~ SP AMERICA Page 7 ot 12 {)perations Summary Report Legal Well Name: MPH-17 Common Well Name: MPH-17 Spud Date: 7/1/2007 Event Name: DRILL+COMPLETE Start: 6/30/2007 End: 7/28/2007 Contractor Name: DOYON DRILLING INC. Rig Release: 7/28/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description ofi (7p~rati4ns 7/17/2007 15:00 - 16:30 1.50 DRILL P PROD1 Continue directional drill f/ 12,457' to 12,550' (6 1/8" TD) - PUW 130k - SOW 75k - ROW 98k - WOB 4k - 250 gpm 2100 psi off, 2390 on - Tq off 6k, on 7k 16:30 - 19:00 2.50 DRILL P PROD1 CBU 3x R&R DP - 250 gpm 2250 psi - 80 rpm - Flow check ~ well f/ 10 min. (static) 19:00 - 23:30 4.50 DRILL P PROD1 ; Pump out of to shoe @ 8694' @ drill rate (No tight hole ~ encountered) - Flow check well f/ 10 min. (static) ~ 23:30 - 00:00 0.50 DRILL P PROD1 Circ casing clean - R&R 50 RPM w/ 250 gpm @ 1845 psi 7/18/2007 ~ 00:00 - 00:30 0.50 DRILL P PROD1 i Cont. circulate hole clean - R&R 50 rpm, w/ 250 gpm @ 1840 ; ps i ~ 00:30 - 02:00 1.50 DRILL P PROD1 Change out saver sub - Rig service 02:00 - 04:00 2.00 DRILL P PROD1 RIH - Wash last std to bttm - tagged bttm 12550' - Circulate w/ 240 gpm @ 2310 psi - Worked pipe 90' could not work back down below 12524' - Apparent ledge - Attempted to work back to bttm without success 04:00 - 07:30 3.50 DRILL P PROD1 Circulate and condition hole f/ Mad pass w/ 260 gpm @ 2330 psi, R&R 70 rpm 07:30 - 16:30 9.00 DRILL P PRODi Pump out of hole @ drill rate / Perform Sperry mad pass f/ 11028' to 10928' - 10798' to 10628' - 10148' to 10048' - 9928' ~ to 9828' - 9078' to 8763' - Q 80 rpm - 300' FPH rate - Cont. i pump out of hole to 8300' (no hole problems encountered I throughout mad pass operations) I 16:30 - 17:30 1.00 DRILL P PROD1 Circulate hole clean w/ 250 gpm @ 1790 psi - R&R 50 rpm 17:30 - 18:30 1.00 DRILL P PROD1 Pump and spot 50 bbls polymer perf pill f/ 8300' to 7000' - Flow check well f/ 10 min. (static) 18:30 - 21:30 3.00 DRILL P PROD1 Pump dry job - POH w/ 4" drill pipe f/ 7000' to 400' 21:30 - 00:00 2.50 DRILL P PROD1 Std back HWDP / DCs in derrick - PJSM w/ Sperry - Remove nuke sources - Dnload MWD 7/19/2007 00:00 - 02:00 2.00 DRILL P PROD1 Cont. down load MWD tools - LD same 02:00 - 03:00 1.00 DRILL P PROD1 Changed out top pipe rams to 9 5/8" casing rams to ; accommodate SW S logging tool configuration 03:00 - 04:00 1.00 BOPSU P PROD1 RU test equip - Test 9 5/8" rams to 250 psi low / 3000 psi high / 5 min. each test - Record on chart - AOGCC was notified of test - Test was witnessed by WSL 04:00 - 04:30 0.50 DRILL P PROD1 RD test equipment - Clear rig floor - Mobilize SWS tools to rig floor ~ 04:30 - 06:00 1.50 DRILL P PROD1 PJSM w/ wireline hands - RU SWS logging - w/ full pressure ' control / 9 5/8" shooting nipple i 06:00 - 09:30 3.50 EVAL P PROD1 MU SW S tools - GR / USIT / CCL / CBL / Tandom tractor - Function conductivity test (ok) 09:30 - 12:00 2.50 EVAL P PROD1 RIH w/ wireline assy. to 6600' - USIT tool not funtioning properly - internal noise interference 12:00 - 13:30 1.50 EVAL P PROD1 POH w/ wireline tools - Tro~ble shoot / test tools - Change out tools - LD CBL tool 13:30 - 14:00 0.50 EVAL P PROD1 RIH w/ SWS wireline tools - GR ! USIT / CCL ( Tandom tractor ~ - Function test (ok) 14:00 - 21:00 7.00 EVAL P PROD1 Cont. in hole with wireline tools / tandom tractors to 7420' - tractors moving down hole very slowly approx. 200' FPH - Pull up on wireline assy. +/- 50' x 2 travel back down to 7400' - Tractor moving approx Q 100' FPH 21:00 - 00:00 3.00 EVAL N DFAL PROD1 Puli test / troubie shoot problem / no additionai over pull or resistance pulling up on assy - picked up on tool to 7290' - Not able to travel down hole with tractors below 7340' - tractors Printed: 8/2l2007 1:50~.04 PM ~ ~ • BP AMERICA Pa~e 8 of ~ 2 Qpera#ions Summary Report Legal Well Name: MPH-17 Common Well Name: MPH-17 Spud Date: 7/1/2007 Event Name: DRILL+COMPLETE Start: 6/30/2007 End: 7/28/2007 Contractor Name: DOYQN DRILLING INC. Rig Release: 7/28/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase " Description of C~perations -~ 7/i9/2007 ; 21:00 - 00:00 3.00 EVAL N DFAL PROD1 appears to have little if any traction 7/20/2007 ! 00:00 - 02:00 2.00 EVAL N DFAL RUNPRD Cont. to try to get tractor assy. to move down hole (no good) - Discuss with SLB Rep @ SLB shop - POH with wireline to inspect tractor cam wear 02:00 - 04:00 2.00 EVAL N DFAL RUNPRD New tractor cams arrive location - Replaced all with new cams (old cams 3~ - 40% wear) 04:00 - 05:00 1.00 EVAL N HMAN RUNPRD Attempt to mobilize SWS logging tools to rig floor (bent top tool on tractor assy. bring up to rig fioor) ~, 05:00 - 06:00 1.00 EVAL N HMAN RUNPRD RD SWS wire line tools and equipment - RU to change rams ; 06:00 - 07:30 1.50 EVAL P RUNPRD Pull wear ring - Install test plug - Change top rams to 2 7/8" x ~ 5~~ ' 07:30 - 08:00 0.50 EVAL P RUNPRD RU to test BOPE 08:00 - 11:30 3.50 EVAL P RUNPRD PJSM - Test BOP and related equipment as per BP / AOGCC regulations - Test to 250 psi low - 3,000 psi high, Each test 5 min. (annular preventer to 250 psi low - 2,500 psi high) w/ 4" test joint - Perform koomey test - Record test on chart. BOP test witnessed by W SL and Toolpusher - John Crisp, AOGCC Rep, waived witness of test. ' 11:30 - 14:00 2.50 EVA~ N HMAN RUNPRD Changed out top pipe rams to 9 5/8" casing rams - Test rams ~ ~ to 250 psi low / 3000 psi high / 5 mins. each test - John Crisp, AOGCC rep, wavied witness of test - LD test joint / test equip - Install wear ring - Clear rig floor 14:00 - 16:00 2.00 EVAL N HMAN RUNPRD PJSM w/ SWS and all rig crew - RU SWS lubricator w/ 9 5/8" shooting nipple and wireline pressure controi packoffs - Spot , SWS wireline unit - Hang WL sheaves - Install USIT tools - i Conductivity test (ok) 'i 16:OQ - 19:30 3.50 EVAL P RUNPRD RIH w/ SWS wireline tools to 7160' - Performed USIT log f/ ~~i 7194' to 4420' (Good quality cement bond to 6075' / found TOC @ 5220') 19:30 - 20:00 0.50 EVAL P RUNPRD RD SWS wireline - lubricator / pressure control equip. / wireline sheaves - Clear rig floor 20:00 - 22:00 2.00 EVAL P RUNPRD Pull wear bushing - Install test plug - C/O top rams to 2 7/8" x I 5" VBRs - Tested rams to 250 psi low / 3000 psi high / 5 mins. ~ each test - AOGCC Rep, wavied witness of test - Pull test plug - Install wear bushing - RILDS 22:00 - 23:30 1.50 EVAL P RUNPRD PJSM w/ SWS and all rig crew - MU drill pipe conveyed logging assy. to 68' 23:30 - 00:00 0.50 EVAL P RUNPRD MU SWS XO - RIH w/ 4" DP / USIT / GR / CCL tools f/ 68' to 800' (Break circ - pump through string every 20 stds on trip in hole) 7/21/2007 00:00 - 03:00 3.00 EVAL P RUNPRD Cont. RIH w/ SWS DP conveyed logging tools to 6880' (pump I through string every 20 stds on trip in hole) 1 03:00 - 05:30 2.50 EVAL P RUNPRD Circulate bttms up w/ 290 gpm, @ 770 psi - PJSM - Hang ~ sheave in derrick - MU side door entry sub and wireline wet connect @ 6880' 05:30 - 06:30 1.00 EVAL P RUNPRD RIH w/ wireline latch head to 200' - Test tools - conductiviry problem w/ software - trouble shoot problem (ok) 06:30 - 09:30 3.00 EVAL P RUNPRD Cont. RIH w/ latch head - Pump down same w/ 126 gpm @ 430 psi - Observe pressure increase of 80 psi when latched - Test tools 09:30 - 12:00 2.50 EVA~ P RUNPRD RIFi fJ 6880' to 8581' (btm of tooi depth) PUWT 127k - SOWT 90k 12:00 - 13:30 1.50 EVAL P RUNPRD POH logging up f/ 8581' to 6880' - Release line from guide on Printed: 8/2/2007 1:50:04 PM ~ ! i BP AI~/IERICA Page 9 of 1~ Operatian~ Sumrnary Report Legal Well Name: MPH-17 Common Well Name: MPH-17 Spud Date: 7/1/2007 Event Name: DRILL+COMPLETE Start: 6/30/2007 End: 7/28/2007 Contractor Name: DOYON DRILLING INC. Rig Release: 7/28/2007 Rig Name: DOYON 14 Rig Number: Qate' From - To Hours Task Code NPT Phase ! Descriptic~n af Operatians 7/21/2007 12:00 - 13:30 1.50 EVAL P RUNPRD side entry sub - POH with line - RD wire line sheaves SWS I equipment - Clear rig floor 13:30 - 15:30 '; 2.00 EVAL P RUNPRD POH w/ 4' drill pipe f/ 6880' to 68' 15:30 - 17:00 i ~ 1.50 EVAL P RUNPRD LD SWS logging tools - Mobilize Perforating tools to rig floor 17:00 - 17:30 0.50 ZONISO P RUNPRD PJSM - MU Perf gun and firing head assy.# 1 17:30 - 21:00 3.50 ZONISO P RUNPRD RIH w/ SWS XOs / Perf gun assy w/ 4" drill pipe f/ 142' to 6300' j (Perf gun assy. 126J') 21:00 - 22:30 1.50i ZONISO P RUNPRD Slip and cut drill line - Service top drive 22:30 - 00:00 1.50, ZONISO P RUNPRD Cont. RIH w/ 4" drill pipe /#1 perf gun assy. f/ 6300' to 8297' - ; i PUWT 125k - SOWT 93k (RA sub / PIP tag Q 6641') 7/22/2007 00:00 - 01:00 1.00 ZONISO P RUNPRD PJSM w/ SWS and rig crew - RU equipment - Hang sheaves f/ blocks 01:00 - 02:30 1.50 ZONISO P RUNPRD RIH w! SWS wireline to correlate guns on depth -(RA sub / PIP tag installed @ 6641' / WL located PIP tag @ 6660' (19' deep) - Evaluate logging data - POH w/ wireline 02:30 - 03:30 ~ 1.00 ZONISO P RUNPRD Space out Drill string to corrected depth - RIH w/ wireline to confirm data / Evaluate logs / correlate guns on depth - Bttm of I j gun assy. Q 8295' MD 03:30 - 05:00 1.50~ ZONISO P RUNPRD POH w/ SWS wireline - Clear rig floor 05:00 - 06:00 1.001 ZONISO P RUNPRD PJSM on perforating - Drop ball - Pump down on seat w/ 160 gpm @ 1250 psi - Slowed pump to 90 gpm last 200 stks - Ball seated @ 785 stks - Pressure to 2900 psi - Guns fired - ~ Perforate 7" casing w/ guns on depth f/ 8195' to 8295' MD (5 shots per ft. @ 72 degree phasing) - Monitor well for fluid i losses / gains f/ 10 min. 06:00 - 10:00 4.00 ZONISO P RUNPRD POH to 125' - LD XO's 10:00 - 12:30 2.50 ZONISO P RUNPRD PJSM - LD guns (all guns fired) 12:30 - 14:30 2.00 ~ ZONISO P RUNPRD PJSM - PU perf guns and XO's to 352' 14:30 - 19:00 4.50 i ZONISO P RUNPRD RIH w/ perf guns on 4" DP f/ 352' to 7626' 19:00 - 2i:00 2.00 ZONISO P RUNPRD PJSM w/ SWS and rig crew - RU equipment - RIH w/ SWS GRICCL wireline tools to 6750' - Log up to correlate guns on depth -(RA sub / PIP tag installed @ 6707.5' / WL located PIP tag @ 6706.5' (1' high) - Evaluate logging data - POH w/ wireline 21:00 - 21:30 0.50 ZONISO P RUNPRD RD SWS equipment and sheaves - clear rig floor 21:30 - 23:00 1.50 ZONISO P RUNPRD Space out Drill string to corrected depth (lower drill string 1') - PJSM on perforating - Drop ball - Pump down on seat w/ 168 gpm Q 1010 psi - Siowed pump to 84 gpm @ 480 stks pumped (Calculated total stks to seat 784) - At 682 stks guns fired @ 540 psi - Perforate 7" casing w/ guns on depth f/ 7315' to 7415' MD and f/ 7525' to 7625' MD (5 shots per ft. @ 72 degree phasing) - No increase in pump pressure observed - Monitor well f/ flow / losses (well static) - Drop second ball to confirm guns fired - Pumped down at same pumping schedule - Observed no pressure increase @ calculated stks to seat ball 23:00 - 00:00 1.00 ZONISO P RUNPRD Check well f/ flow / losses f/ 15 min. (static) - Circulated bttms up w/ 210 gpm @ 1350 psi - Monitor well f/ 10 mins. (static) 7/23/2007 00:00 - 03:00 3.00 ZONISO P RUNPRD Pump dry job - POH w/ 4" drill pipe f/ 7625' - 352' 03:00 - 06:00 3.00 ZONISO P RUNPRD LD SWS XOs - PJSM - LD perf guns (all guns fired) - Cfear rig floor 06:00 - 07:00 1.00 CONDH P RUNPRD MU BHA - Bit, stab, float sub, Dc's, jars and Hwt. 07:00 - 13:00 6.00 CONDH P RUNPRD RIH w/ 4' DP to 12437' - Fill every 20 stds - Obtain drag Printed: 8/2/2007 1:50:04 PM ~ ~ BP AMER[CA Page 10 of ~2 Operations Sumrnary Report Legal Well Name: MPH-17 Common Well Name: MPH-17 Spud Date: 7/1/2007 Event Name: DRILL+COMPLETE Start: 6/30/2007 End: 7/28/2007 Contractor Name: DOYON DRILLING INC. Rig Release: 7/28/2007 Rig Name: DOYON 14 Rig Number: pate From - To Hours Task Code NPT Phase ' Description of Qperations 7/23/2007 07:00 - 13:00 6.00 CONDHL P RUNPRD parameters every 500' - 13:00 - 16:00 3.00 I CONDH ~ P ~ RUNPRD Screw in T.D. - Break circulation w/ 170 gpm 1000 psi - Obtain ~ ~ parameters - Wash to bottom at 12,528' - CBU 3x w/ 300 gpm ~ ~ I 1650 psi - R&R w/ 120 rpm, 5k tq. - UPWT 123k - SOWT 85k - RTWT 98k (no hole problems encountered) 16:00 - 22:00 6.00 CONDH P RUNPRD Pump out of hole f/ 12528' to 6000' @ drlg rate - Flow check well f/ 10 min. (static) 22:00 - 23:00 1.00 CONDHL P RUNPRD CBU x 2/ circulate casing clean w/ 300 gpm @ 920 psi - Flow ' check well (static) 23:00 - 00:00 1.00I CONDHL P RUNPRD RIH w/ 4" drill pipe f/ 6000' to 8690' (no mud losses to ' i formation last 24 hrs) 7/24/2007 00:00 - 01:30 1.50 ~ CONDH P RUNPRD Slip and cut drilling line - Service top drive 01:30 - 03:30 ~ 2.00 CONDH P RUNPRD RIH w/ 4' DP f/ 8690' to 12442' - Fill pipe every 20 stds 03:30 - 05:00 1.50 CONDH P RUNPRD Screw in T.D. - Break circulation w/ 190 gpm @ 1160 psi - ~ Obtain parameters - Wash f/ 12442' to 12528' - Circulate hole j clean w/ 275 gpm 1600 psi - R&R w/ 120 rpm, 4k-5k tq. - ' ~ UPWT 120k - SOWT 85k - RTWT 98k (no tight hole I encountered) 05:00 - 06:30 1.50 ~ CONDH P RUNPRD PJSM - Pump and spot new 9.2 ppg Flo-Pro f/ 12528' to 7300' - I Flow check well - Drop 1.90" drift - Pump dry job 06:30 - 09:30 3.00 CONDH P RUNPRD POH f/ 12,528' to 7300' (no tight hole observed on trip) 09:30 - 10:30 1.00 CONDHL, P RUNPRD PJSM with all personnel involved in upcoming caustic wash ~ I opps. - Review procedure, pumping schedule and individual ( I assignments. 10:30 - 11:30 1.00 ~ CONDH P RUNPRD Pump H.V. sweeps, spacers and "Safe Surf O" preflush - i Pump 81 bbis caustic wash w/ 10 Ibs per bbl concentration - Pump 30 bbl citric acid pilllspacer to neutralize CW. 11:30 - 12:30 1.00 CONDHI~ P RUNPRD Displace well w/ 9.2 ppg KCL brine water (Neutralized Caustic wash / brine water solution pumped to surface and loaded on I ~ Vacuum truck was checked - had a PH @ 7.5 / prior to haul off ; and disposal) 12:30 - 14:30 2.00 CONDH P RUNPRD Clean pits - Surtace lines - Change out shaker screens to 325 mesh to aide in filtering process 14:30 - 16:00 1.50 CONDH P RUNPRD Spot and RU MI filtration unit - PJSM - Function test lines / unit 16:00 - 00:00 8.00 CONDH P RUNPRD Filter 9.2 ppg KCL brine w/ MI filtration unit @ 3 bpm / Circulate weil w/ 300 gpm,1200 psi (observed no down hole losses last 24 hrs) 7/25/2007 00:00 - 11:00 11.00 CONDH~ P RUNPRD Filter 9.2 ppg KCL brine w/ MI filtration unit @ 2.75 bpm / Circ well Q 150 gpm @ 343 psi - Finished circulating down hole i and surface pits 103 NTUs 11:00 - 12:00 1.00 CONDH P RUNPRD Pump and spot 60 bbl Safe-lube pill @ 7200' w/ 294 gpm @ 1190 psi - Flow check well f/ 10 mins. (static) 12:00 - 13:00 1.00 CONDH P RUNPRD POH w/ 4" driil pipe f/ 7200' to 3000' - Rack back in derrick - ~ Cont. to fiiter surtace volume " 13:00 - 16:30 3.50 CONDH P RUNPRD drill pipe 1x1 to pipe shed - Rack back 2 stds LD 28 stds 4 HW DP - LD BHA 16:30 - 19:00 2.50 CONDH P RUNPRD PU 12 jts 4 3/4" DCs - 51 jts HWDP f/ pipe shed 1x1 (total 1938') - Shut down filtering surface volume reading 40 NTUs 19:00 - 19:30 0.50 CONDH P RUNPRD RIH w/ 6 stds DCs / 15 stds HWDP to 1938' - Circulate through / clear pipe w/ 230 C~ 440 psi - Flow check well f/ 10 mins (static) 19:30 - 21:30 2.00 CASE P RUNPRD PJSM - RU to run 3.5" 9.3# L-80 167-M liner w/ Resinject Printed: 8/2/2007 1:50:04 PM ~ ~ Legal Well Name: MPH-17 Common Well Name: MPH-17 Event Name: DRILL+COMPLETE Contractor Name: DOYON DRiLLING INC Rig Name: DOYON 14 ~ Date ' From - To Hours Task Code 7/25/2007 19:30 - 21:30 2.00 CASE P 21:30 - 00:00 2.50 CASE P 7/26/2007 00:00 - 05:30 5.50 CASE P 05:30 - 10:30 5.00 CASE P 10:30 - 13:00 I 2.50 i CASE I P 13:00 - 13:30 I 0.501 CASE I P 13:30 - 16:00 ~ 2.50 { CASE ~ P 16:00 - 00:00 I 8.001 CASE I P 7/27/2007 00:00 - 02:00 2.00 CASE P 02:00 - 04:00 2.00 CASE P 04:00 - 04:30 0.50 CASE P 04:30 - 07:00 2.50 RUNCO 07:00 - 00:00 17.00 RUNCO~P 7/28/2007 00:00 - 02:00 2.00 RUNCO P 02:00 - 04:00 ~ 2.00 I RUNCO 04:00 - 05:00 1.00 RUNCO 05:00 - 06:30 1.50 RUNCO 06:30 - 07:30 I 1.001 RIGD I P P AMERICA s Sumr~ary Start: 6/30/2007 Rig Release: 7/28/2007 Rig Number: 3se I' DE Spud Date: 7/1 /2007 End: 7/28l2007 ation of Operations RUNPRD screens / Swell Pkrs RUNPRD Run 3.5" 9.3# L-80 IBT-M liner wf Resinject screens / Tam swell packers to 1600' (record SOWT every 500' after jt. #50) RUNPRD Run liner 3.5" liner assy. f/ 1600' to 4424' - XO RUNPRD RIH w/ 3 1/2" liner on 4" DP to 7300' - Break circulation - Establish rate wl 3 bpm, 400 psi - Continue RIH on 4" DP to 10,510' - RIH w/ DC's & Hwt. to 12,448` w/ no issues / good hole - PU pup jt and single to space out liner - Obtain parameters - PUWT 158k - SOWT 110k - Spot liner at 12,484' - Liner top at 8068' RUNPRD PJSM - Break circ. w/ 2.7 bpm 670 psi - Pump 150 bbis 9.2 ppg filtered brine - Pump 160 bbls bleach pill - Pump 10 bbis brine to clear lines - Drop .90" ball - Pump down on seat w/ 2.6 bpm 570 psi - Ball seated at 623 stks (63 bbls) - RUNPRD Pressure to 1600 psi to set hanger - Set down 60k - Pressure to 2400 psi to set ZXP packer - Pressure to 3400 psi to neutralize/ release - Pressure to 4000 psi and shear circ. sub - Bullhead 6.5 bbls down DP - No returns observed - PU 12 ft to clear "Dog Sub" from liner top - Set down 60k on liner top to verify depth - PU 60' RUNPRD Break circulation wJ 3 bpm 350 psi - increase rate to 6.5 bpm 1500 psi - Circulate hole clean w/ filtered 9.2 ppg brine - Final NTU reading 70-80 RUNPRD PJSM - Blow down lines - POH f/ 8068' LD 4" Hwt. & DC's to 6082' - LD 4" DP to 1900' - Run stds f/ derrick in hole to 5200' - LD 4" DP ix1 to pipe shed RUNPRD Cont. LD DP f/ 4500' to 567' RUNPRD PJSM - Slip and cut drlg line - Service top drive RUNPRD LD 4" DP to pipe shed 1x1 f/ 567 to surface - Clear rig floor RUNCMP Puil wear bushing - Change out bales - RU Doyon csg. torque turn equip w/ stabbing guide and compensator RUNCMP PJSM - Run 3 1/2" completion string 248 jts -/ 9.2# / L-80 ( TCII to 8090' - Obtain parameters PUWT 95k - SOWT 75k - Break circ w/ 60 gpm @ 70 psi - Lowered pipe slowly, saw 50 psi increase as seal assembly was engaged - Shut down pump - Slacked off - Sat down @ 8105' - LD jts as needed - Space out to land RUNCMP Space out w/ pups - MU FMC tubing Hanger / landing joint - RU circ head and line - Landed tubing @ 8,101' (245 joints totai ran) RUNCMP Pull up hole 30' - Close Bag - Reverse Circulate 9.2 ppg KCL brine water to surface - Spotted inhibited brine in annulus - (NTU reading after circ. Q 85) - Open annular RUNCMP Land tubing Q 8101' - RILDS - Drop ball and rod - PJSM - RU test equip. RUNCMP Test 3.5" 9.3# L-80 TCII tubing to 4200 psi f/ 30 min. - Record on chart (good) - Bleed down tubing to 2500 psi - Pressure up on annulus to 3000 psi - Held test f/ 30 min. - Record on chart (good) Bleed down tubing - Sheared out RP shear valve - Bleed off all pressure - RD test equip. - Reverse through RP valve w/ 3 BPM @ 350 psi - tD landing jt RUNCMP Install TWC - Test to i500 psi f/ top and bottom - Record on chart Printed: 8/2/200~ 1:50:04 PM . .. ~ ~ BP AMERICA Operations Summary Report Page 12 of ~ 2'' Legal Well Name: MPH-17 Common Well Name: MPH-17 Spud Date: 7/1/2007 Event Name: DRILL+COMPLETE Start: 6/30/2007 End: 7/28/2007 Contractor Name: DOYON DRILLING INC. Rig Release: 7/28/2007 Rig Name: DOYON 14 Rig Number: ~` Date ' From - To Haurs Task Code NPT Phase ~escription of Operations 7/28/2007 07:30 - 12:00 4.50 RIGD P RUNCMP PJSM - Drain stack - Blow down lines - ND BOPE - NU adapter ~ flange - FMC test to 5000 psi (good) - RD tubing Equip. - Chg. I out bales / Elevators 12:00 - 14:00 2.00 RIGD P RUNCMP ~ RD Rockwasher unit, move same / Sim opps. FMC test Adapter flange to 5000 psi f/ 10 min. (good) - Fill CIW 3 1/16" 1 5000# tree w/ diesel - RU test Equip. - Test tree to 5000 psi f/ ; 5 mins. - Record on chart - RU DSM lubricator - Pull TWC 14:00 - 16:30 2.50 RIGD P RUNCMP PJSM w/ Little Red pumping ser. - RU lines - Test - Pumped down IA w/ 91 bbis diesel FP w/ 2 bpm @ 650 psi - Utube 1- ~ I hour / Sim opps. Prep rig floor f/ move - RD Little red sevices 16:30 - 18:00 1.50 RIGD P RUNCMP i RU DSM lubricator - Install BPV - Test BPV f/ bttm to 1000 psi - RD cellar lines / Inspect same - Secure well f/ release - Released rig @ 18Q0 hrs. Printed: 8/2/2007 1:50:04 PM ~ • Printed: 8/14/2007 3:14:~ ~ ~ • Halliburton Company Survey Report Campany: E3P AmflGCY Date: 8/~3I2Q~7 T~me: .14:49.21 Fage: ' 1 FietH: Mtilne Pc7inE Co-ardinat~(i~t~~;Ref~renCe: ' W~1L- ME'H-17, True North Site. M Pt H P~d ~'ert~cal.(~VITj Referenee: ' iu1PH-17: 69:8 R't:(L• MPH-17 Sac~ion ('C'S}~f~rene e; W ell (t}.QO~I,~.OOE,i 69.04Azi) '~ Wet(p~th: NtFN-17'~ St~rvey Calci~~a~on 141~thod: Minimurirn Curuature `~~~ I>b: Or1Cle Field: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 GeoDatum: NAD27 (Clarke 1866) Coordinate System: Well Centre ~ Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Well: MPH-17 Slot Name: Well Position: +N/-S 1168.15 ft Northing: 6010149.22 ft Latitude: 70 26 18.153 N +E/-W 1253.36 ft Easting : 556649.44 ft Longitude: 149 32 17.108 W Position Uncertainty: 0.00 ft Wellpath: MPH-17 Drilled From: Weli Ref. Point ~ 50029233580000 Tie-on Depth: 34.10 ft Current Datum: MPH-17: H eight 69.80 ft Above System Datum: Mean Sea Level Magnetic Data: 6(30/2~06 Declination: 23.88 deg Field Strength: 57598 nT Mag Dip Angle: 80.89 deg I Vertical Section: Depth From (TVD) +N/-S +E/-W DirecYion ft ft ft deg 34.10 0.00 0.00 169.04 Survey Program for Detinitive Wellpath Date: 6/20/2006 Validated: No Version: 5 Actual From To Survey Toolcode Tool Name ft ft 100.00 716.00 MPH-17 Weln av Gyro (1 00.00-716 CB-GYRO-SS Camera based gyro single shots 766.98 12479.71 MPH-17 IIFR+MS+SAG (766.98-124 MWD+IFR+MS MWD + IFR + Multi Station Survey ` MD In~-' Azim TVD Sys TvD N/S E!W MapN ' MapE Tool ' ft deg d~c~ ft' ft -- !t ft! ft : ft 34.10 0.00 0.00 34.10 -3570 0.00 0.00 6010149.22 556649.44 TIE LWE 100.00 0.34 209.75 100.00 30.20 -0.17 -0.10 6010149.05 556649.34 CB-GYRO-SS 169.00 1.73 132.12 168.99 99.19 -1.05 0.57 6010148.18 556650.02 CB-GYRO-SS 225.00 1.36 144.15 224.97 155.17 -2.15 1.59 6010147.08 556651.05 CB-GYRO-SS 258.00 2.36 128.93 257.95 188.15 -2.90 2.35 6010146.34 556651.81 CB-GYRO-SS 347.00 4.23 134.00 346.80 277.00 -6.33 6.14 6010142.94 556655.62 CB-GYRO-SS 439.00 6.86 136.04 438.36 368.56 -12.64 12.39 6010136.67 556661.93 CB-GYRO-SS 528.60 10.62 135.50 526.31 456.51 -22.32 21.83 6010127.07 556671.44 CB-GYRO-SS 619.00 15.86 134.21 614.86 545.06 -36.98 36.63 6010112.52 556686.35 CB-GYRO-SS 716.00 19.60 130.72 707.24 637.44 -56.85 58.47 6010092.83 556708.34 CB-GYRO-SS 766.98 19.68 125.71 755.26 685.46 -67.43 71.92 6010082.34 556721.87 MWD+IFR+MS 863.71 20.05 129.94 846.24 776.44 -87.59 97.86 6010062.39 556747.96 MWD+IFR+MS 957.58 20.82 132.21 934.20 864.40 -109.13 122.56 6010041.04 556772.81 MWD+IFR+MS 1052.50 23.78 131.84 1022.01 952.21 -133.23 149.32 6010017.14 556799.75 MWD+IFR+MS 1146.86 26.24 131.43 1107.52 1Q37.72 -159.73 179.13 6009990.87 556829.77 MWD+{FR+MS 1241.10 29.40 130.16 1190.86 1121.06 -188.44 212.44 6009962.42 556863.29 MWD+IFR+MS 1337.45 33.29 130.19 1273.13 1203.33 -220.77 250.73 6009930.39 556901.51 MWD+IFR+MS 1430.03 37.50 130.26 1348.58 1278.78 -255.39 291.66 6009896.08 556943.00 MWD+IFR+MS 1525.93 40.18 130.83 1423.27 1353.47 -294.49 337,35 6009857.33 556988.99 MWD+IFR+MS 1617.55 39.67 131.17 1493.53 1423.73 -333.06 381.73 6009819.10 557033.65 MWD+IFR+MS 1712.80 40.82 130.96 1566.23 1496.43 -373.49 428.13 6009779.03 557080.35 MWD+IFR+MS 1806.73 44.03 129.80 1635.56 1565.76 -414.52 476.40 6009738.37 557128.93 MWD+IFR+MS 1901.74 49.51 129.86 1700.61 1630.81 -458.84 529.54 6009694.46 557182.40 MWD+IFR+MS 1997.37 50.35 131.08 1762.17 1692.37 -506.34 585.21 6009647.39 557238.42 MWD+IFR+MS 2093.92 53.39 130.73 1821.78 1751.98 -556.06 642.61 6009598.11 557296.19 MWD+IFR+MS 2189.03 56.67 129.52 1876.29 1806.49 -606.27 702.20 6009548.36 557356.16 MWD+IFR+MS 2283.86 57.62 128.77 1927.73 1857.93 -656.56 763.99 6009498.55 557418.32 MWD+IFR+MS 2378.47 61.41 129.70 1975.72 1905.92 -708.12 827.12 6009447.47 557481.83 MWD+IFR+MS 2471.22 63.75 13Q.34 2018.43 1948.63 -761.07 890.16 6009395.01 557545.27 MWD+IFR+MS ~ ~ . • Halliburton Company Survey Report Company: ';BP ~1maC0 Date: 8U312007 Time: f4:b$:2i ~~ Page: ~'~~ 2 Field: Miine Pbint Ca-ordrnate(1VE} Reference_ i V~tell: ~1tF?[-l-17, Tfue NflCth Site: IM Pt H Pad Verticai (TVI?) Referenee: '~~~ MP'H-t7. 69:8 ; Welt: MPH-17' Section (VS) Re£erene~s 1 Well {4:Q4N,4:OQE,35~,t~~kAzi~ Wellpath: 'MPH-17: Snrvey Calcul$tian MetE~ad: ' MinimUm Curuature ~b: €5racle Survey ' IV~D Ia~l`. 'lYzim TVL3 ' Sys TVD NfS F11W Map~t M~pE '~oal ' ft deg d~~ ft ft ft ft '. ft ft 2564.49 63.03 129.86 2060.21 1990.41 -814.78 953.94 6009341J9 557609.45 MWD+IFR+MS 2659.93 62.59 128.97 2103.82 2034.02 -868.68 1019.53 6009288.39 557675.44 MWD+IFR+MS ~ 2754.06 63.58 129.17 2146.43 2076.63 -921.58 1084.69 6009235.99 557740.99 MWD+IFR+MS I 2850.37 63.76 129.52 2189.15 2119.35 -976.31 1151.44 6009181.78 557808.15 MWD+IFR+MS ! 2946.17 64.21 129.24 2231.16 2161.36 -1030.93 1217.99 6009127.67 557875.11 MWD+IFR+MS ~ 3041.17 64.62 129.38 2272.19 2202.39 -1085.21 1284.29 6009073.90 557941.81 MWD+IFR+MS ' 3133.98 63.34 129.31 2312.90 2243.10 -1138.09 1348.78 6009021.52 558006.70 MWD+IFR+MS 3229.62 62.98 129.02 2356.08 2286.28 -1191.98 1414.95 6008968.13 558073.26 MWD+IFR+MS 3326.18 63.36 128.46 2399.67 2329.87 -1245.90 1A82.16 6008914.73 558140.87 MWD+IFR+MS ~ 3418.92 62.83 128.05 2441.63 2371.83 -1297.11 1547.10 6008864.02 558206.20 MWD+IFR+MS ~ 3513.41 62.64 128.12 2484.92 2415.12 -1348.92 1613.21 6008812.72 558272.69 MWD+IFR+MS 3606.79 62.36 128.07 2528.04 2458.24 -1400.02 1678.39 6008762.12 558338.26 MWD+IFR+MS 3703.10 60.86 128.89 2573.83 2504.03 -1452.74 1744.72 6008709.92 558404.98 MWD+IFR+MS 3793.81 61.92 128.83 2617.26 2547.46 -1502.70 1806.73 6008660.43 558467.36 MWD+IFR+MS 3891.45 62.87 129.16 2662.51 2592.71 -1557.15 1873.97 6008606.50 558535.01 MWD+IFR+MS ~I 3989.39 63.64 129.18 2706.58 2636.78 -1612.39 1941.78 6008551.78 558603.22 MWD+IFR+MS I ~ 4080.29 63.28 128.49 2747.20 2677.40 -1663.38 2005.12 6008501.28 558666.95 MWD+IFR+MS I 4179.86 64.14 128.12 2791.30 2721.50 -1718.72 2075.18 6008446.48 558737.41 MWD+IFR+MS 4274.10 63.38 127.63 2832.97 2763.17 -1770.61 2141.90 6008395.10 558804.52 MW D+I FR+MS 4368.90 62.18 127.65 2876.33 2806.53 -1822.09 2208.65 6008344.13 558871.66 MWD+IFR+MS 4464.05 63.02 127.22 2920.12 2850.32 -1873.44 2275.73 6008293.30 558939.12 MWD+IFR+MS i 4557.75 61.78 126.87 2963.53 2893.73 -1923.47 2342.01 6008243.78 559005.76 MWD+IFR+MS i 4652.51 62A2 126.81 3008.16 2938.36 -1973.59 2408.90 6008194.18 559073.03 MWD+IFR+MS ~ 4747.99 61.68 126.96 3053.20 2983.40 -2024.12 2476.24 6008144.17 559140.74 MWD+IFR+MS 4760.25 61.90 126.38 3059.00 2989.20 -2030.57 2484.90 6008137.78 559149.46 MWD+IFR+MS 4869.90 60.97 127.27 3111.43 3041.63 -2088.28 2561.99 6008080.66 559226.97 MWD+IFR+MS 4972.38 60.35 127.39 3161.64 3091.84 -2142.46 2633.03 6008027.03 559298.41 MWD+IFR+MS j 5068.52 61.06 128.03 3208.69 3138.89 -2193.74 2699.36 6007976.26 559365.12 MWD+IFR+MS ~ 5164.74 62.32 127.64 3254.32 3184.52 -2245.70 2766.26 6007924.81 559432.41 MWO+IFR+MS 5259.10 61.91 127.33 3298.45 3228.65 -2296.46 2832.44 6007874.57 559498.97 MWD+IFR+MS 5353.73 61.34 126.96 3343.42 3273.62 -2346.73 2898.81 6007824.80 559565.71 MWD+IFR+MS 5447.14 62.05 127.47 3387.71 3317.91 -2396.47 2964.30 6007775.56 559631.57 I MWD+IFR+MS ( 5542.71 62.75 128.14 3431.99 3362.19 -2448.39 3031.22 60~7724.16 559698.87 MWD+IFR+MS 5638.95 62.27 127.95 3476.41 3406.61 -2501.00 3098.45 6007672.06 559766.50 MWD+IFR+MS 5731.70 61.89 127.80 3519.84 3450.04 -2551.32 3163.14 6007622.25 559831.56 MWD+IFR+MS 5827.53 62.12 128.66 3564.82 3495.02 -2603.68 3229.61 6007570.40 559898.42 MWD+IFR+MS 5920.60 63.43 132.39 3607.41 3537.61 -2657.45 3292.49 6007517.11 559961.70 MWD+IFR+MS 6015.21 62.48 134.88 3650.44 3580.64 -27t5.59 3353.47 6007459.44 560023.12 MWD+IFR+MS i 6109.90 61.49 136.92 3694.92 3625.12 -2775.61 3411.65 6007399.87 560081.74 MWD+IFR+MS 6203.50 62.52 139.25 3738.86 3669.06 -2837.11 3466.85 6007338.80 560137.40 MWQ+IFR+MS 6299.63 65.42 144.53 3781.06 3711.26 -2905.07 3520.09 6007271.26 560191.15 MW D+I FR+MS 6396.46 66,98 148.57 3820.15 3750.35 -2978.97 3568.89 6007197.73 560240.51 MWD+IFR+MS 6491.12 67.11 152.25 3857.~8 3787.28 -3054.75 3611.92 600712228 560284.11 MWD+IFR+MS 6586.09 67,03 155.26 3894.09 3824.29 -3133.19 3650.59 6007044.15 560323.38 MWD+IFR+MS 6680.80 66.97 160.31 3931.11 3861.31 -3213.87 3683.54 6006963.74 560356.93 MWD+IFR+MS 6775.54 68.18 165.21 3967.27 3897.47 -3297.48 3709.47 6006880.33 560383.49 MWD+IFR+MS 6868.35 70.81 170.15 3999.80 3930.00 -3382.37 3727.98 6006795.59 560402.64 MWD+IFR+MS 6959.28 75.78 172.72 4025.93 3956.13 -3468.46 3740.92 6006709.6i 560416.24 MWD+IFR+MS 7056.70 79.26 175.40 4046.98 3977.18 -3563.05 3750.74 6006615.11 560426.78 MWD+IFR+MS 7152.89 83.00 177.82 4061.81 3992.01 -3657.90 3756.35 6006520.31 560433.11 MWD+IFR+MS 7248.94 85.05 182.14 4071.82 4002.02 -3753.40 3756.38 6006424.83 560433.86 MWD+IFR+MS I. 7343.06 87.47 185.66 4077.96 4008.16 -3847.08 3749.99 6006331.11 560428.18 MWD+IFR+MS • . • Halliburton Company Survey Report Company: 'BP Ampc6 Field: ; M1t}ilne Pqir~t Date: 8l13f2(}Q7 Time: 14:Q3:21 Co-ordinaEe(N~) Reference: WeIE: MPH-i7,'frUe ', ~age; ' 3 NOrt~i Site: A11 PY H P1tl yerfical {TVI?~ Reference: ' MPN-17: ~9.8 Well: MPH 17` Seetion (~S}Referencg: ? W81i (O.flDh1~Q.#}QE>3fr~A~Azi) WeFlpath: N1PH ] 7 SarWey CalculaC'tan 1VIethod: ' Minimism Cunrattt~E: ': t5h: ~s~G#e Survey MD Inci'' Azim 7'~D ' Sys'P~D N!5 EfW MapN lVfap~ ~'aal - ft de9 deg ft ' ft ft ft ft ' ft I 7436.70 88.21 186.29 4081.49 4011.69 -3940.14 3740.25 6~06237.98 560419.15 MWD+IFR+MS 7533.18 87.10 189.67 4085.43 4015.63 -4035.59 3726.87 6006142.44 560406.50 MWD+IFR+MS I 7627.05 89.32 191.44 4088.37 4018.57 -4127.82 3709.68 6006050.10 560390.01 MWD+IFR+MS , I 7720.65 86.60 191.16 4091.7Q 4021.90 -4219.54 3691.36 6005958.25 560372.39 MWD+IFR+MS ~ I 7766.87 86.60 190.19 4094.44 4024.64 -4264.88 3682.81 6005912.85 560364.18 MWD+IFR+MS 7815.52 86.23 i90.39 4097.48 4027.68 -4312.65 3674.14 6005865.02 560355.87 MWD+IFR+MS 7861,64 86.54 190.53 4100:39 4030.59 -4357.91 3665.78 6005819.70 560347.86 MWD+IFR+MS 7908.45 85.99 189.59 4103.44 4033.64 -4403.90 3657.62 6005773.65 560340.05 MWD+IFR+MS 7955.26 87.34 190.46 4106.16 4036.36 -4449.92 3649.49 6005727.55 560332.27 MWD+IFR+MS 8003.59 87.34 189.57 4108.41 4038.61 -4497.46 3641.09 6005679.98 560324.24 MWD+IFR+MS 8048.68 87.10 189.77 4110.59 4040.79 -4541.86 3633.52 6005635.53 560317.01 MWD+IFR+MS 8099.17 86.73 189.30 4113.31 4043.51 -4591.58 3625.17 6005585.75 560309.04 MWD+IFR+MS 8145.03 86.42 189.54 4116.05 4046.25 -4636.74 3617.68 6Q~5540.54 560301.89 MWD+IFR+MS 8193.97 85.98 188.90 4119.29 4049.49 -4684.94 3609.86 6005492.29 560294.43 MWD+IFR+MS I 8239.72 85.74 189.~3 4122.60 4052.80 -4730.01 3602.75 6005447.16 560287.66 MWD+IFR+MS I 8290.04 85.55 189.21 4126.42 4056.62 -4779.55 3594.79 6005397.57 560280.09 MWD+IFR+MS , 8350.54 84.18 189.39 4131.83 4062.03 -4839.02 3585.06 6005338.04 560270.80 MWD+IFR+MS 8385.08 84.12 189.13 4135.35 4065.55 -4872.93 3579.53 6005304.09 560265.53 MWD+IFR+MS 8431.94 83.87 188.94 4140.25 4070.45 -4918.96 3572.21 6Q05258.01 56~258.57 MWD+IFR+MS 8480.91 83.63 189.42 4145.59 4075.79 -4967.01 3564.44 6005209.91 560251.17 MWD+IFR+MS 8525.83 84.00 190.76 4150.43 4080.63 -5~10.98 3556.62 6005165.89 560243.68 MWD+I~R+MS 8574.73 83.94 190.35 4155.56 4085.76 -5058.78 3547.71 6005118.02 560235.13 MWD+IFR+MS 8609.75 84,99 191.30 4158.94 4089.14 -5093.02 3541.16 6005083.74 560228.85 MWD+IFR+MS 8659.03 85.30 192.68 4163.11 4093.31 -5141.05 3530.96 6005035.63 560219.01 MWD+IFR+MS 8740.89 85.99 193.00 4169.33 4099.53 -5220.63 3512.82 6004955.92 560201.48 MWD+IFR+MS 8781.43 85.92 193.53 4172.19 4102.39 -5259.99 3503.55 6004916.50 560192.50 MWD+IFR+MS 8828.93 87.28 193.37 4175.00 4105.20 -5306.11 3492.52 6004870.31 560181.82 MWD+IFR+MS 8874.70 86.66 192.82 4177.42 4107.62 -5350.62 3482.16 6004825.72 560171.81 MWD+IFR+MS 8924.36 87.04 193.37 4180.15 4110.35 -5398.92 3470.93 6004777.34 560160.94 MWD+IFR+MS 8970.98 88.77 194.06 4181.86 4112.06 -5444.18 3459.88 6004732.01 56a150.24 MWD+IFR+MS 9015.56 88.46 194.32 4182.93 4113.13 -5487.38 3448.96 6004688.72 560139.65 MWD+IFR+MS 9067.07 87.78 194.48 4184.62 4114.82 -5537.25 3436.15 6004638.76 560127.22 MWD+IFR+MS 9162.45 87.10 194.70 4188.88 4119.08 -5629.46 3412.15 6004546.38 560i03.93 MWD+IFR+MS 9257.44 88.21 195.65 4192.77 4122.97 -5721.06 3387.31 6004454.61 560079.78 MWD+IFR+MS 9351.92 91.23 196.11 4193.23 4123.43 -5811.92 3361.46 6004363.56 560054.62 MWD+fFR+MS 9397.97 90.74 195.72 4192.44 4122.64 -5856.20 3348.83 6004319.19 560042.34 MWDtIFR+MS 9446.86 90.80 196.77 4191,78 4121.98 -5903.13 3335.16 6004272.16 560029.02 MWD+IFR+MS 9493.78 90.12 196.13 4191.41 4121.61 -5948.13 3321.87 6004227.07 560016.08 MWD+IFR+MS 9539.99 91.11 197.07 4190.91 4121.11 -5992.41 3308.67 6004182.69 560003.21 MWD+{FR+MS 9586.70 90.86 196.77 4190.11 4120.31 -6037.09 3295.08 6004137.91 559989.96 MWD+IFR+MS 9633.47 91.23 196.33 4189.25 4119.45 -6081.92 3281.76 6004092.99 559976.99 MWD+fFR+MS 9682.97 91.36 196.04 4188.14 4118.34 -6129.44 3267.96 6004045.37 559963.55 MWD+IFR+MS 9727.37 90.$6 196.10 4187.28 4117.48 -6172.10 3255.68 6004002.62 559951.59 MWD+IFR+MS 9773.32 91.85 197.21 4186.19 4116.39 -6216.1i 3242.51 6003958.52 559938.76 MWD+IFR+MS 9824.20 91.23 197.70 4184.82 4115.02 -6264.63 3227.25 6003909.89 559923.88 MWD+IFR+MS 9870.09 90.74 197.37 4184.03 4114.23 -6308.38 3213.43 6003866.04 559910.39 MWD+IFR+MS 9920.41 91.79 197.89 4182.92 4113.12 -6356.32 3i98.19 6003817.99 559895.52 MWD+IFR+MS 9975.64 91.11 197.44 4181.52 4111.72 -6408.93 3181.44 6003765.26 559879.16 MWD+IFR+MS 10013.93 90.00 198.01 4181.15 4111.35 -6445.40 3169.78 6003728.70 559867.79 MWD+IFR+MS 10060.23 89.32 197.43 4181.43 4111.63 -6489.5~ 3155.69 6~03684.50 559854.03 MWD+IFR+MS 10109.22 88.89 196.31 4182.19 4112.39 -6536.38 3141.48 6003637.52 559840.17 MWD+IFR+MS 10154.26 88.27 195.67 4183.31 4113.51 -6579.66 3129.07 6003594.15 559828.10 MWD+IFR+MS 10204.24 88.21 196.~4 4184.85 4115.05 -6627.72 3115.43 6003546.00 559814.82 MWD+IFR+MS • 11' ~ Ha iburton Company Survey Report Company: ,BP Amoe~ Date: 8/13/24Q7 Time: 14:p3:21 Page: 4 Fie1d: ~tlilne Pojnt Co-ordina~e(iVE~ Re~erenee_ ' W211~ MPH 17, T~t~B Nprtti Sike: M Pt H Pad Vertical (TVD) Referenee: ' N1PN- 17: 69.$ W~ll: MPH-1,7'. 3ection (~S) Referenc~: ' Wef[ (U.Oat~~{~~fl0E,169.04Azi) Wetipath: !MPH-17, Suruey Calcula~ionlViethod: Minirrru~ CurvaEUre Db: Oracle Survey MI} Inc!" Azim i TVD ' Sys TVD N/S ElW `~~pN '. MapE Tool ' ft deg deg ft ' ft tt ft ', ' ft ', ft 10249.32 87.22 197.64 4186.64 4116.84 -6670.83 3102.38 6003502J9 559802.10 MWD+IFR+MS i 10297.61 87.65 199.40 4188.80 4119.00 -6716.57 3087.05 6003456.94 559787.13 MWD+IFR+MS ~ 10344.97 87.04 199.54 4191.00 4121.20 -6761.17 3071.29 6~~3412.22 559771.70 MWD+IFFt+MS ~ 10391.14 88.52 199.69 4192.79 4122.99 -6804.63 3055.80 6003368.65 559756.54 MWD+IFR+MS I ' 10436.65 88.21 199.60 4194.08 4124.28 -6847.47 3040.50 6003325.70 559741.58 MWD+IFR+MS ~ 10485.90 89.26 200.61 4195.17 4125.37 -6893.71 3023.58 6003279.34 559725.01 MWD+IFR+MS 10534.98 89.38 201.74 4i95.75 4125.95 -6939.47 3005.85 6003233.45 559707.63 MWD+IFR+MS 10578.86 90.62 201.12 4195.75 4125.95 -6980.32 2989.82 6003192.49 559691.91 MWD+IFR+MS 10674.76 91.54 203.86 4193.95 4124.15 -7068.90 2953.15 6003103.64 559655.91 MWD+IFR+MS ; 10721.97 90.31 205.17 4193.18 4123.38 -7111.85 2933.56 6003060.55 559636.66 MWD+IFR+MS ~ 10770.47 90.99 204.69 4192.63 4122.83 -7155.82 2913.12 6003016.42 559616.55 MWD+IFR+MS 10818.51 88.76 204.72 4192.74 4122.94 -7199.46 2893.04 6002972.63 559596.81 MWD+IFR+MS ~ 10864.07 90.12 205.83 4193.18 4123.38 -7240.66 2873.59 6002931.30 559577.67 MWD+IFR+MS 10910.25 88.95 206.65 4193.56 4123.76 -7282.08 2853.18 6002889.73 559557.57 MWD+IFR+MS 10960.97 90.86 208.42 4193.64 4123.84 -7327.05 2829.73 6002844.58 559534.47 MWD+IFR+MS 11053.27 91.67 214.50 4191.60 4121.80 -7405.72 2781.59 6002765.55 559486.94 MWD+IFR+MS I 11152.32 90.25 220.68 4189.94 4120.14 -7484.16 2721.21 6002686.67 559427.16 MWD+IFR+MS ~ 11197.46 91.30 223.13 4189.33 4119.53 -7517.75 2691.07 6002652.85 559397.28 MWD+IFR+MS 11246.57 92.29 225.17 4187.79 4117.99 -7552.97 2656.88 6002617.38 559363.36 MWD+IFR+MS 11291.97 92.28 225.60 4185.98 4116.18 -7584.83 2624.59 6002585.28 559331.31 MWD+IFR+MS 11340.16 91.54 226.77 4184.38 4114.58 -7618.17 2589.84 6002551.67 559296.82 MWD+IFR+MS ~ 11389.25 91.48 228.63 4183.08 4113.28 -7651.20 2553.54 6002518.38 559260.78 MWD+IFR+MS ii436.43 91.73 228.71 4181.76 4i11.96 -7682.34 2518.13 6002486.97 559225.61 MWD+IFR+MS 11482.33 92.28 229.45 4180.16 4110.36 -7712.39 2483.47 6002456.66 559191.18 MWD+IFR+MS 11529.45 93.46 231.87 4177.80 4108.00 -7742.22 2447.07 6002426.56 559155.02 MWD+IFR+MS 11574.91 93.09 233.35 4175.20 4105.40 -7769.78 2411.01 6002398.73 559119.17 MWD+IFR+MS 11623.28 91.91 232.54 4173.09 4103.29 -7798.90 2372.45 6002369.32 559080.83 MWD+IFR+MS 11670.36 91.91 233.79 4171.52 4101.72 -7827.11 2334.79 6002340.83 559043.39 MWD+IFR+MS 11718.90 91.17 235.36 4170.22 4100.42 -7855.23 2295.25 6002312.41 559004.07 MWD+IFR+MS 11767.81 90.68 235.14 4169.43 4099.63 -7883.10 2255.07 6002284.23 558964.11 MWD+IFR+MS 11814.50 90.43 234.86 4168.97 4099.17 -7909.88 2216.83 6002257.17 558926.07 MWD+IFR+MS 11861.54 90.37 234.85 4168.65 4098.85 -7936.96 2178.36 6002229.80 558887.82 MWD+IFR+MS 11908.78 90.59 234.66 4168.25 4098.45 -7964.22 2139.78 6002202.25 558849.45 MWD+IFR+MS 11956.10 90.43 234.39 4167.83 4098.03 -7991.68 2101.25 6002174.50 558811.13 MWD+IFR+MS 12~02.94 89.88 234.73 4167.70 4097.90 -8018.84 2063.09 6002147.05 558773.18 MWD+IFR+MS 12098.51 90.80 234.99 4167.13 4097.33 -8073.85 1984.94 6002091.46 558695.46 MWD+IFR+MS 121A4.69 90.31 234.49 4166.69 4096.89 -8100.51 1947.23 6002064.52 558657.96 MWD+IFR+MS 12195.64 89.88 234.20 4166.60 4096.80 -8130.20 1905.83 6002034.51 558616.79 MWD+IFR+MS 12242.56 89.51 234.12 4166.85 4097.05 -8157.68 1867.80 6002006.75 558578.97 MWD+IFR+MS 12337.21 91.97 235.35 4165.63 4095.83 -8212.31 1790.53 6001951.53 558502.13 MWD+IFR+MS 12386.17 92.35 236.13 4163.78 4093.98 -8239.86 1750.10 6001923.69 558461.91 MWD+IFR+MS 12431.69 91.97 236.14 4162.07 4092.27 -8265.20 1712.32 6001898.06 558424.33 MWD+IFR+MS 12479.71 94.45 236.96 4159.38 4089.58 -8291.63 1672.32 6001871.33 558384.54 MWD+IFR+MS 12550.00 94.45 236.96 4153.93 4084.13 -8329.84 1613.58 6001832.68 558326.09 PROJECTED to TD ~ • ~'C~i.A2~ICAL INTEGRiTY ~L.PORT ~ ~ =~~D ,,..__ - ~~t'~~ l OpEiZ ~ r ~i~ ' ~~ ~~~~Y~E~~G\~~ =. = G : ~. ~ ~ . _ ~ ~ . ~ (~ ~r5'(~ `~ i,~ ~LI.. NUM" ER ~ ~ ~~ \ ~ n ~ LL DA ~ ~_ TD : ~~~j~~?~.. ~~~ 'I'V~D ; = ~TD : ?~Il7 ~'VD ~t ~~ ~ :~r`~i i: a s i^~:~_ S ho e:~ b~ ~ t~ID y~t;~ ~c, 1'~-D ; li~I : ~~ _ ~: ~ e = • ~j~ I~ ~ l ~ h o e . ~ ~ ~~5~'~ t^~ ~~ '?'`IL'~ ; ~' C P . ~S~ ~0 ~ ~.~ ~ 1 ~. ~o ='; ~ S~ O ~~Tz~ _ ~ o ~ _ : ^ • ~ ~ ~~~... ? 2 C K e r ~c.~~ '~D T'J7i ; S e t a t ~ ~ ~ ~ ~ole S-~~e ~ 3~ ~nd ~r ~~i~ ; Per_`s to . ~~~~:~?~=C~~ ~NTEGR~TY - aa~T #~ r_n;:u ~ us ?~ e s s T e s t: -~ ; 1 S nin ;~ 0 min Co~e:tts : ~ '~' CHP N~ C~ ~, ~ NTEGRTT T_ pART # 2 ~~~, ~ 4~a~n~ l S ~ ~l^ G ~ h~n~ S C emen~ Volt~es : A~t . ~iner N {~r ; Cs ~ ` ,~;~DV ~ (~ . C.~~ -rol to cover ~er=s ~"• 3G~~ l~~ ~~ ~~n`S ~cs CC~"s~C -~tc,~ . V O~ ~ c ~ V~ i t , --: e o r e t i c a 1 "?' 0 C ~ 3G~Ey ~l~-~ ~~~. `~,7 ~.~ ~ r t - GC,~~~ +n~ ~ ~O C J'r '1'1 ~ ~~j ~ _ Cement Bond Log (Yes or No)~_; In AOGCC File ~ ~r ,-~`~ C3L ~valuation, ~one aoove per~s C~~, ~~~ C~~~'~~v~c:~~pV~, ?roduction Z.og: T~ve ~UNC:;LUS ~ Ot1S : ?ar~ il ~ ~ ai ~ i L ~~'tS ,'`V~('1~~~ ; Evaluation ~~~~ ~~~?-~ ~. ~ . Page 1 of 2 Maunder, Thomas E (DOA) From: Johnson, David A. (~airweather) jDavid.A.Johnson@bp.comj Sent: Monday, August 27, 2007 3:32 PM 70: Maunder, Thomas E (DOA) Cc: Stewman, Sondra D Subject: RE: MPH-17 (207-066 Tom, The drilling permit and drilling program for the volume of the 12.5 ppg Crete cement was based on the yield of 1.52 cuft/sx as quoted by the Schlumberger cementing engineer in Anchorage. On Friday, 7/6/2007 (the day before cementing) we were reviewing the plan forward with the rig and it was then noted that there was a discrepancy on the yield between Schumberger in Anchorage and Schlumberger in Deadhorse for the taii slurry. The Schlumberger engineer in Deadhorse stated that the correct yield for the 12.5 ppg Crete slurry was 2.25 cuft/sx and not 1.52 cuft/sx. Schlumberger in Anchorage verified that they had used the wrang yield in the cement proposal. I apologize for not notifying you. Because we were not changing volumes, I did not relate to the fact that the wrong yield in the program was also the wrong yie~d in the permit. In regards to the cement volumes, the 200 BBLS of cement to surface was most likely a combination of contaminated mud followed by contaminated cement followed by cement. I verified with the rig team that they had good cement to surface after they finished cementing. The 90 BBLS lost should be accurate although they would have been trying to track volumes while diverting the last 200 BBLS to a slop tank. The casing was set at 61 degress and we obviously had some channeling. The same problem exists with the yield on the 12.5 ppg lead cement. The correct yield was 2.25 cuft/sx and not 1.52 cuft/sx. I apologize again for not notifying you. Dave From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Monday, August 27, 2007 1:34 PM To: Johnson, David A. (Fairweather) Cc: Stewman, Sondra D Subject: MPH-17 (207-066 ~ave and Sondra, I am reviewing the 407 submittecf for the well. I have the foNowing observation and request ... The volume determined from the sacks of cement for the surface casing on the 407 sheet does not agree with the barrels af slurry reported in the operations summary and the overall cement volume balance does not agree. On the 401, 393 sx of lead @ 4.49 ft3/sx (315 bbls) and 781 sx of tail c'~'.~ 1.52 ft3/sx (212 bbls) were planned. Total planned 527 bbls. On the 407, 393 sx of lead and 560 sx of tail are reported as pumped. Applying the yields given on the 401, 315 bbls of lead and 152 bbls of tail are calculated gi~ing a total of 467 bbls reported as pumped. In the operations summary on July 7, 320 bbls of tead and 220 bbls o# tail, a total of 540 bbls is reported as pumped. Additionally it is reported that 90 bbls of cement were lost to the formation and 200 bbls of lead cement were returned to surface. I calculate the gage volume of 12.25" hole from surPace (0') to the shoe depth {4799') to be 268 bbls. For cement to circulate, this volume at a minimum must be fiNed. To ftll gage hole and aNow for the reported loss and tMe volume circulated the minimum volume pumped weuld be 268 + 90 + 200 = 558 bbls. si2~i2oa~ ~ • Page 2 of 2 Dave, t'd appreciate your looking into the nusnber differences. As you can see, samething d~sn't "add up". Call or message with any qusstion. Thanks in advance. Tom Maunder, PE AOGCC 8/27/2007 ~ ~ 14-Aug-07 AOGCC Librarian 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPH-17 Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: 34.10' MD Window / Kickoff Survey 0.00' MD (if applicable) Projected Survey: 12,550.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO Timothy.Allen@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Timothy Allen 6900 Arctic Blvd. Anchorage, AK 99518 ,~ ~ /~ ~ / ~ ~ Date ~ ~ ~.0~ Signed ~i~/~~, (/~~`U7~ Please call me at 273-3534 if you have any questions or concerns. Regards, Timothy Allen Survey Manager Attachment(s) av~/ v~~ ~~ U SC~lu~b~l'~@~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99603-2838 ATTN: Beth wQu i.,ti a ~~ ~ -C~j~ , . ~,~ ~, ~ ~ ~.~~ N.J~.t~ J 1P ~~U~ ~1~c~ ~dl ~ ~~~ C;~~. ~vmrr~-ssi~~ ,~~iG`~`1CN"'c~1-,~'= ~ .,,. n..~,..:...:,... NO. 4346 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Endicott o~i2~~o~ 3-25lL-27 11686762 STATIC PRESSURE SURVEY 07/09/07 1 4-18/S-30 11813062 STATIC PRESSURE SURVEY 07/10/07 2-50/U-08 11676953 LDL 07N3/07 1 1-61/Q-20 11695066 SBHP SURVEY 07/13/07 1 3-41/K-39 17846795 WFL & PRESS GRADIENT 07/17/07 1 1-4'!/0-23 11695068 1NJECTION PROFILE 07/24/07 1 3-41/K-39 11846795 IPROF & JEWELRY 07(16/07 1 L1-09 11626109 LDL O6/27/07 1 02-306 17626108 LDL 06/25/07 1 H-07A 11637346 LDL O6/30/07 1 12-05A 17638649 FPIT 07/04/07 1 12-12A 11661162 MEM STATIC TEMP/JEWELRY 07/05/07 1 P2-08 11686761 STATIC PRESSURE SURVEY 07/05/07 1 17-02 11745227 MEM GLS 07/10/07 1 09-11 11686765 STATIC PRESSURE SURVEY 07/71/07 1 X-19B 11801075 LDL 06/19/07 1 MPK-30 11676952 FPIT 07/12/07 1 11-08 11813061 STATIC PRESSURE SURVEY 07/07/O7 1 03-14A 11849926 BHP SURVEY 07/25/07 1 01-16 11630486 PROD PROFILE 06/28/07 1 MPH-17 11813063 CBL & IMAGE LOG 07/21/07 1 01-15A 11849924 USIT 07/20/07 1 02-306 11873058 USIT 07/04/07 1 MPJ-24 11638647 USIT 06/29/07 1 E-101 11630488 PRODUCTION PROFILE 06/30/O7 1 G-18A OI CAQC Af~l!\IA\11/1 GI1/±C ~C 11209612 f~C1~T ~V c~ MCNL 07/19/06 1 ~ BP Exploration (Alaska) Inc. ..,.... v v.._ vv. .~^v• •v. Petrotechnical Data Center ~R2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Afaska Oafa & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: a~ • ~ ~ ~ ~ ~ O SARAH PAUN, GOVERNOR ~~ ~~ ~~jf~7 333 W. 7thAVENUE, SUITE 100 COI~TSERQ~~`I011T COl-II~II55IO1Q ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Dan Kara Senior Drilling Engineer BP Exploration Alaska, Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Milne Point Unit, Schrader Bluff Oil Pool, MPH-17 Sundry Number: 30?-227 Dear Mr. Kara: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representa.tive of the Commission to witness any required test, conta.ct the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days af~er written notice of this decision, or such further time as the Commission grants for good cause shown, a person a~'~cted by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. DATED this ~ day of July, 2007 Encl. ~~-~~~ Sincerely, ~~~ ~STATE OF ALASKA ~7 ~ ~ ~~~~ ~ ALASKA OIL AND GAS CONSERVATION COMMI SION APPLICATION FOR SUNDRY APPROVAL ~~3 ~°~s,~~ . 2o aac 2s.2so Qe 1. Type of Request: ^ Abandon ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time E~ension ~ as~ ~QO ? 0 ~ ^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended~~ s , ~ C ^ Change Approved Program ^ Pull Tubing ^ Perforate New Pooi ^ Waiver ~ Other `Q~ ~~ Plu Back P81 ~ 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ^ Development ^ Exploratory 207-066 , 3. Address: ~ Service ^ Stratigraphic 6. API Number: p0 ~D~ P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-23358- -00 ~3 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: MPH-17 Spacing Exception Required? ^ Yes ~ No 9. Property Designation: 10. KB Elevation (ft): 11. Field / Pool(s): ADL 375132 P~ ~o ~' Milne Point Unit / Schrader Bluff t2- PR~SENT WELL CONDITIOIY SUM MARY Total Depth MD (ft): Total Depth ND (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 453 453 453 453 N/A N/A i Len th iz MD ND Burst Colla se Stru ural on r 112' 20" 112' 112' 14 47 Surface tntermediate Pr u tion Liner Perforation Depth MD (ft): Perforation Depth ND (ft): Tubing Size: Tubing Grade: Tubing MD (ft): N/A N/A N/A N/A N/A Packers and SSSV Type: N~A Packers and SSSV MD (ft): N/A 13. Attachments: 14. Well Class after proposed work: ^ Description Summary of Proposal ^ BOP Sketch ^ Exploratory ^ Development ~ Service ~ Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencin O erations: July 2, 2007 ^ Oil ^ Gas ~ Plugged ^ Abandoned 17, Verbal Approval: Date: 7/2/2 07 ^ WAG ^ GINJ ^ WINJ ^ WDSPL Commission Representative: Tom Maunder 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Dave Johnson, 564-4171 Printed N e Dan Kara Title Senior Drilling Engineer Prepared By Name/Number: Signatur ~ Phone 564-5667 Date Sondra Stewman, 564-4750 Commission Use Onl Sundry Number: ~ Conditions of approval: Notify Commission so that a representative may witness ^ Plug Integrity ^ BOP Test ^ Mechanical Integrity Test ^ Location Clearance Other: Subsequent Form Required: 1.~~~ ~ ~~~ v~ ~ A roved B: COMMISSIONER THE COMMISStON Date F~ ~~~ c~j~, ° ~v ~a? Form 10-403 Revised 06/2006 ` Sub ' Duplicate I G ! L ~ '~D"~ ~L ~Ui fl ~ 1DD7 ~~~~ ~R ~ b p July 2nd, 2007 Tom Maunder Alaska Oil & Gas Conservation Commission 333 W. 7th Avenue, Suite 100 Anchorage, AK 99501 Re: Sundry Notice Milne Point MPH-17 Permit No: 207-066 Mr. Maunder: ~ . ~, .~: ~_~ ~~. MPH-17 spudded on 7/1/2007 at 1:00 PM. The well was drilled to a total depth o 45 ' D when it was discovered that the directional BHA had been oriented to the wrong ' e line at 150 degrees off. It is necessary to plug back the open hole and re-drill the well from its original kick-off point of 300' MD. The well program and directional program remain the same. The plug back and sidetrack procedure are attached. If you have any questions or require any additional information, please contact the undersigned at 564-4171, or Dan Kara at 564-5803. Since~e~i, l ; ~. :...~/ ~ ~ Dave Johnson Drilling Engineer BPXA / ACT ~ b p ~ _~ ~ J . Milne Point MPH-17 Piug Back and Sidetrack Procedure 1. RIH with open ended drill pipe to 453' MD. Circulate and condition mud. 2. Rig up cementers. Mix and pump 481 sacks (80 bbls) of Artic SetSetl cement. Balance cement plug. Slurry Weight: 15.7 ppg Slurry Yield: 0.93 ft3/sack Mix Water 3.58 gal/sack Estimated top of cement with 100 % excess at 180'. 3. Pull out of cement slowly to 140'. 4. Circulate hole clean @ 140' 5. Wait on cement to reach ±1000 compressive strength on UCA 6. Make up directional BHA. Clean out to original kick-off point at +/- 200'. 7. Directionally drill well as per original program. ~ TREE: 3-1/8" - SM FMC WELLHEAD: 11" x 3-1/8" 5M F~n 5 Tub Hgr. 11" x 3-1l8° TC-II T&B 3" CIW-H BPVT 2a" Conductor @ 1'12' 12.25" Hole ~ 453' MD DATE ~REV. BY ~ COMMENTS ~ 07i0212007 ~ DAJ ~ Plug Back for Directional Sidetrack ~ ~ 80 bbl 15.7# Artic Set 1 cement Estimated Top @ 180` MD MILNE POINT UNIT WELL MPH-17 API NO: 50-029-23358-0000 MPH-17 PB ~ ~ ~ Legal Well Name: MPH-17 Common Well Name: MPH-17 ~Event Name: DRILL+COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 00:00 - 05:00 I 5.001 MOB I P { i PRE 05:00 - 06:30 1.50 MOB P PRE 06:30 - 08:00 1.50 MOB P PRE 08:00 - 12:00 4.00 MOB P PRE 12:00 - 15:00 3.00 RIGU P PRE Spud Date: 7!1/2007 Start: 6/30/2007 End: Rig Release: Rig Number: I 15:00 - 22:00 7.00 RIGU P SURF 22:00 - 23:00 1.00 RIGU P SURF 23:00 - 00:00 1.00 RIGU P SURF 7/1/2007 00:00 - 04:30 4.50 RIGU P SURF 04:30 - 05:00 0.50 DIVRTR P SURF 05:00 - 10:30 5.50 DRILL P SURF 10:30 - 11:00 0.50 DRILL P SURF 1 i:00 - 12:00 1.00 DRILL P SURF 12:00 - 13:00 1.00 DRILL P SURF 13:00 - 15:30 2.50 DRIL~ P SURF 15:30 - 17:00 1.50 DRILL P SURF 17:00 - 18:00 1.00 DRILL N WAIT SURF 18:00 - 19:00 1.00 DRILL P SURF 19:00 - 19:30 0.50 DRILL P SURF 19:30 - 21:30 2.00 DRILL P SURF 2i:30 - 23:30 2.00 DRILL P SURF 23:30 - 00:00 0.50 DRILL N HMAN SURF I7/2/2007 00:00 - 06:00 6.00 DRILL N HMAN SURF Prepare rig for moving - Skid rig floor from drlg position to move position - Move off well Remove cellar doors - Install back / front boosters Move rig from MPS on matt boards U main road Cont. rig move to Milne Point H-pad Move rig on pad - Remove rear / front boosters - Install rear doors - Spot rig over conductor - Spot rockwasher and berm up same - Skid rig floor into drill position - Hook up service lines - Prep. mud pits / take on water in mud pits Accept rig C~ 15:00 hrs - Instali Diverter / Knife valve / Hydrill / Riser / Flowline Mix spud mud while loading 4" drill pipe in pipe shed - Perform derrick inspection - Clear and clean up rig floor PU 4" drilf pipe 1x1 f/ pipe shed and std back in derrick Cont. PU 4" drill pipe 1x1 f/ pipe shed / 153 jts total - Load and strap BHA in pipe shed Function test diverter system and perform accumulator test, witnessed by W SL - John Crisp w/ AOGCC wavied witness of tests PU 5" HWDP 1 x1 f! pipe shed - Std back in derrick - Load and Strap BHA - Mobilize to rig floor MU 1 std of flex DCs - Std back in derrick - Calibrate and test rig gas detectors - Calibrate mud pit probes PJSM - RU Sperry Gyro tools - Hang sheave in derrick - Pre-Spud meeting w/ rig crew MU BHA - Bit / Motor / Float sub / Stabilizer / Xo - Pre-Spud meeting w/ rig crew - Fill hole w! spud mud - Check flleaks (None) Drill 12 1/4" hole f/ 112' to 222' w/ HWDP POH w/ HWDP - Std back in derrick Wait on Sperry crossover sub to arrive location MU MWD tools - Orient UBHO sub w/ motor / Flex drill collars / Power up and Initialize MWD RIH and wash to bottom w/ std HWDP Directional Drill 12 1/4" hole f/ 222' to 269' - Gyro survey ~ 100' - 169' (Gyro survey every std) Directional Drill 12/14" hole f/ 220' to 453' - Gyro suroey ~ 349' (survey indicated 100 degree change in direction) POH w/ HWDP to UBHO Sub - Sub orientation off 150 degrees (mistakenly madeup up on wrong scribe mark) Stand back BHA and MWD tools in derrick - Power down MWD battery pack - Mobilize 4" mule shoe and XO to rig floor - Wait on cement ! SLB equipment to arrive location Printed: 7/2/2007 12:16:08 PM ~ ta~a-7~1~ Dui ~1~TD ~ C~rTSERQA'1`IO1~T COril~'IISSIOI~T ' Dan Kara Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 ~ SAR.4H PALIN, GO!/ERAIOR 333 W. 7thAVENUE, SUITE 100 ANCHORAGE,ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Milne Point Unit, Schrader Bluff Oil Pool, MPH-17 BP Exploration (Alaska), Inc. Permit No: 207-066 Surface Location: 2282' FNL, 3994' FEL, SEC. 34, T13N, R10E, UM Bottomhole Location: 40' FNL, 2404' FEL, SEC. 1 l, T12, RlOE, UM Dear Mr. Kara: Enclosed is the approved application for permit to drill the above referenced service well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneeusly issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witnes y required test, contact the Commission's petroleum field inspector at (9~9-3607 (pager). .y J DATED this ~ day of May, 2007 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. 1 a. Type of work ~ Drill ^ Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Deveiopment Gas ~ Service ^ Multiple Zone ^ Stratigraphic Test ^ Development Oil ~ Single Zone 1 c. Specify if well is propq,~p~ffgr~~g ^ Coaibed Methane ^ Gas Hy rates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ~ Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: MPH-17 3. Address: P.O. Box 196612, Ancho~age, Alaska 99519-6612 6. Proposed Depth: MD 12510 TVD 4166 12. Field / Pool(s): Milne Point Unit / Schrader Bluff 4a. Location of Well (Governmental Section): SurFace: 2282' FNL 3994' FEL SEC 34 T13N R10E UM 7. Property Designation: ADL 375132 , , . , , , Top of Productive Horizon: 981' FNL, 275' FEL, SEC. 02, T12N, R10E, UM 8. Land Use Permit: 13. Approximate Spud Date: June 15, 2007 Total Depth: 40' FNL, 2404' FEL, SEC. 11, T12N, R10E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 2862' 4b. Location of Well (State Base Plane Coordinates): Surface: x-556649 y-6010149 Zone-ASP4 10. KB Elevation Planned (Height above GL): 70~ feet 15. Distance to Nearest Well Within Pool: 290' away from MPS-21 16. Deviated Wells: Kickoff Depth: 300 feet Maximum Hole An le: 92.6 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 1885 Surface: 1466 t8. in Pr m: ' S ' i f n To - e in ` th - Bo om u nti of- ment ff. r a ks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD ND includin sta e data 42" 20" 92# H-40 Weld 112' Surface SurFa e 112' 112' 260 sx Arctic Set A rox. 12-114" 9-5/8" 40# L-8 BTC 4795' Surface Surfa 4795' 3070' 393 sx AS Lite 781 Crete 8-3/4" 7" 26# L- T II 8896' rf Surf 88 6' 4160' Cret 164 sx Class' " 6-1/4" 3-1/2" 9.2# L-80 IBT 4592' 7918' 4129' 12510' 4166' Uncemented Sand Screen Liner i~ 19. PRESE NT WELL'GONDITION S UMMARY{To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): Total Depth ND (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): Casing Length Size . Cement Volume MD', TVD Conductor / Structural Surface Intermediate Prd in Liner Perforation Depth MD (ft): Perforation Depth ND (ft): 20. Attachments ~ Filing Fee, $100 ^ BOP Sketch ~ Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ~ Property Plat ^ Diverter Sketch ^ Seabed Report ~ Drilling Fluid Program ~ 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Dave Johnson, 564-4171 Printed Name Dan K r Title Senior Drilling Engineer j Prepared By Name/Number: Si nature i - Phone 564-5667 Date ~ra ~ Sondra Stewman, 564-4750 Commission Use Onl Permit To Drill Number: .~a O D API Number: 50- ti~? ~?,3,~5,3'ODdO Permit Approval See cover letter for Date: other re uirements Conditions of Approval: '~~~}~'~ ~~ ~~ Q .~5~ If box is checked, uJell may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: ~ ~"~ ~\~ C.~~¢ ~.~G U~,~`~~ ~~~ Samples Req'd: ^ Yes ~ No Mud Log Req'd: ^ Yes dNo ~~~;~.~~ ~ ~~~`~~S.,i~`~~`~~~ w~ H S Measures: ^ Yes No ir ctiona! Survey Req'd: Q( Yes ^ No . ~ , •~ ns~~~~ ~; Other: ~7~C.~CSc._.,~- 5~~~<'~vrc,l~'`~-'L.~~~~~~~c:s.~~~aC~`~_~1 r ~`~ ~f ~ /)'~-- APPROVED BY THE COMMISSION Date J v7 , COMMISSIONER Form 10-401 Revised 12/2005 ~~~ ~~ ~~x ~ ~ zoor STATE OF ALASKA ~ ` G~~ ~~~~~~~~ ~ ~ ALASlC~'JIL AND GAS CONSERVATION COMMIS~c~N .~ M 1 PERMIT TO DRILL ,~ AY 4 2dp~ ~~~ 20 AAC 25.005 <~~aska ~i1 & Gas Cons. Coirxni ion l~ ~/ , QR1GlNAL~-' Submit In Duplicate ~~ bp ~ ~~e. ~ May l lt", 2007 Tom Maunder Alaska Oil & Gas Conservation Commission 333 W. 7`~ Avenue, Suite 100 Anchorage, AK 99501 Re: Request for Exception to 20 AAC 25.412 (b) MPU S-Pad / MPH-17 Mr. Maunder: ~ ~ C~;~t'~-~C~ `'~ ~'~ ~~'~ ~~'~'`'~ ~1~~ ~ '~ BP Exploration (Alaska) Inc. ("BP") requests an Request for Exception to 20 AAC 25.412 (b) which requires that the packer be set within 200 feet MD above the top perforations. The requested exception pertains to the drilling of MPH-17, a Schrader NB/NE/OA sand injectar. We are planning to drill and complete MPH-17 as a single string NB/NE/OA injector with the NB/NE sands behind perforated 7" Intermediate casing and the OA lateral completed with a 3-1/2" injection screens and swell packers. The completion is designed to utilize TAM Freecap Swell Packers and Resinject screens with sized ports to control injection. The asset also needs to utilize an injection mandrel for the NB sand to allow them to regulate the flow to it and/or isolate it. It is anticipated that the NB sand will have the greatest injection capacity. In order to operate/change the injection valve, it has to be accessible by wireline. Coil tubing is unable to operate the kick tool needed for the side pocket mandrel. Wireline cannot operate at angles greater than 65 degrees which would require placing the top packer 1400' MD (450' VD) above the top perforations. The setting point would be in the Ugnu. I have attached a diagram for your review which shows the injection mandrel placed at 63 degrees on the proposed directional plan (also attached). On completion we would set the mandrel as close as possible to 65 degrees with the anticipated distance between the perforations and packer at 1100' to 1400'. The 7" casing would have premium threads and quality cement above the packer setting point. A cement bond log would be run. If you have any questions or require any additional information, please contact the undersigned at 564-4171, or Dan Kara at 564-5803. Sincerely, Dave Johnson Drilling Engineer BPXA / ACT ~ ~ bp Well Name: I MPH-17 Schrader NB/NE/OA Injector Drilling and Completion Plan Summary T e of Well: Schrader Bluff Sin le Selective Injector Surface Location: 2,282° FNL and 3,s94~ FEL (As Proposed) Section 34, T13N, R10E UM ' ' E = 556,649 N = 6,010,149 T1 - Top of NB 981' FNL and 275' FEL Section 2, T12N, R10E UM E= 560,400' N= 6,006,200' Z= 4,090' TVD T2 - Base of NE 2,180' FNL and 486` FEL Section 2, T12N, R10E UM E= 560,200' N= 6,005,0000' Z= 4,150' TVD T3 -Mid OA 2,964' FNL and 718` FEL Section 2, T12N, R10E UM E= 559,975' N= 6,004,214' Z= 4,203' TVD T4 -Mid OA 3,816' FNL and 976' FEL Section 2, T12N, R10E UM E= 559725' N= 6,003,360 Z= 4,193 TVD T5 -Mid OA 4,179' FNL and 1,174' FEL Section 2, T12N, R10E UM E= 559,530' N= 6,002,995 Z= 4,175 TVD T6 - OA - TD 40' FNL and 2,404' FEL Section 11, T12N, R10E UM E= 558,310' N= 6,001,845 Z= 4,166TVD Distance to Pro ert line 2,862' Unit Bounda Distance to nearest well 290' from MPS-21 Top OA AFE Number: Estimated Start Date: 6/15/07 Ri : Do on 14 Ri da s to com lete: 21 MD: 12,510' TVD: 4,166' Max Inc: 92.6° KOP: 300' KBE: 70' Well Desi n: Slimhole - Sin le Strin Injector Ob'ective: Schrader Bluff NB/NE/OA Page 1 ~ ~ Mud Program: 12-1/4" Surface Hole (0' - 4,795'): Spud Densit PV YP H API Filtrate Chlorides m I 8.6 - 9.8 10 - 35 30 - 50 8.5 - 9.5 NC-8 < 1000 8-1/2" Intermediate Hole (4,795' - 8,896'): LSND Densit PV YP H APt Filtrate ' MBT 8.8-9.4 10-20 18-28 9.0-9.5 6-8 <25 6-1/8" Production Hole 8,896' -12,510' : LSND Densit PV YP H API Filtrate MBT 8.9-9.1 10-20 20-25 9.0-9.5 6-7 <25 Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to DS-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R. Casing/Tubing Program Hole Casing Burst Collapse Length Top Bottom Size Diameter Wt/Ft Grade Conn psi psi feet MD/ TVDrkb MD/ TVDrkb Inches Inches 42 20 92 H-40 Weld 1530 520 112-ft ~ 0 112 /112 12.25 9.625 40.0 L-80 BTC 5750 3090 4795 0 4795/ 3070 8.5 7.0 26.0 L-80 TCII 7240 5410 8896' 0 8896/ 4160 6.125 3'S w~ 9.2 L-80 IBT 10160 10540 4592 7918/ 4129 12510/4166 Screens * 3.5 9.2 L 80 TCII 10160 10540 7918 0 7918/4129 Cement Program: Casin Size 9-5/8", 40.0#, L-80, BTC Surface Casin Tail cement = 2629' MD to BPF C«~ 2166'. 40% Excess over Gauge Basis Hole. Lead to surface. 150% Excess over Gauge Hole from PF to Surface Total Cement Spacer 50 bbl of MudPush Volume: 525 bbl Lead 314 bbl, 393 sx of Arctic Set Lite: 10.7 and 4.49 ft /sx Tail 211 bbl, 781 sx Crete mixed at 12.5 Ib/ al & 1.52 ft /sx Page 2 ~ ~ Casin Size 7", 26.0#, L-80, TCII Intermediate Casin Tail cement = 986' MD to 7910' with 40% Excess over Gauge Hole. Basis Lead Cement = 2297' MD to 500' above TUZC with Excess over Gauge Hole. TOC @ 5413' MD. Design Based on circulating densities. Total Cement S acer p 20 bbl of MudPush Volume: 107 bbl S acer 20 bl of MudPush Lead bbl, 292 sx Crete mixed at 12.5 Ib/ al & 1.52 ft /sx Tail 34 bbl, 164 sx "G" mixed at 15.8 Ib/ al & 1.17 ft/sx Tem BHST ~80°F from SOR `~~~h~ ~ ~c~ c~.o.~;~~~ Evaluation Program: ~=~1 ~1~~ 12-1/4" Section Open Hole: . MWD/GR/Res • Photo Gyro • IFR/CASANDRA, • S er InSite 8-1/2" Section Open Hole: . MWD/GR/RES • Neu/Den • IFR/CASANDRA, • S er InSite Cased Hole: . GR/SCMT in PDC mode 6-1/8" Section Open Hole: . MWD/GR/RES • Neu/Den/PWD • IFR/CASANDRA, • S er InSite Cased Hole: Formation Markers: Formation Tops MD ft TVD (ft) Pore Pressure si EMW Ib/ al BPRF 2166 1820 760 8.35 To U nu TUZC 5913 3601 1,533 8.35 SBF2-NA 7259 4063 1,734 8.35 SBF1-NB 7477 4090 1083-1852 5.18 - 8.86 SBE4-NC 7844 4122 1,759 8.35 SBE2-NE 8004 4136 1307-1765 6.18 - 8.35 SBE1-NF Faulted Out TSBD - To OA 9261 4188 1261-1878 5.89 - 8.77 Dee est OA 9515 4203 1266-1885 5.89 - 8.77 TD 12510 4166 1254-1868 8.35 Page 3 ~ Well Control: Intermediate/Production hole: • Maximum anticipated BHP: • Maximum surface pressure • Planned BOP test pressure • Integrity tests: • Integrity tests: • Planned completion fluid: ~ 1,885 psi at 4,203' TVD (Mid OA) 1,466 psi at (Based on a full column of gas at 0.1 psi/ft) 3,000 psi FIT to 10.5 Ib/gal 20' below the 9-5/8" shoe. FIT to 10.5 Ib/gal 20' below the 7" shoe. Kill Weight Brine with diesel cap. Drilling Hazards & Contingencies: • Running Gravel/heavy clay problems have been encountered in some E-Pad wells. High Vis Mud should be utilized. • Hydrates have been reported on H-Pad. Expected Depth for hydrates 2000' SS to 2500' SS. Keep the Mud as Cool as possible. Lost Circulation Lost Circulation is a potential if elevated mud weights are required for controlling hydrates. Expected Pressures • All Formation are expected to be 8.77 ppg or less. Pad Data Sheet • Please Read the H-Pad Data Sheet thoroughly. Hydrocarbons • Hydrocarbons are possible in the Ugnu & Schrader Bluff interval. Gas cut mud has been experienced in the Schrader Bluff. Faults Fault Details Potential Faults MD Intersect TVDrkb Intersect TVDss Intersect Estimated Throw Throw Direction Uncertainty Fault#1: SV/SV 3760 2579 -2509 55-65' DT-E Med Fault #2: U nu/U nu 5561 3434 -3364 55-65' DT-W Med Fault #3: NA/NA 7076 4028 -3958 10-20' DT-N Hi h Fault #4: NE/OA 9100 4176 -4106 20-30' DT-NE Hi h Fault #5: OA/OA 10610 4185 -4115 20-30' DT-NE Med Page 4 ~ Hydrogen Sulfide • MPH Pad is not designated as an H2S Pad ~ Well Name H25 Level Date of Readin #1 Closest SHL Well H25 Level MPH-16 Not sam led #2 Closest SHL Well H2S Level MPH-18 Not sam led #3 Closest 5HL Well H2S Level MPH-14 <2 m 6/1/2001 Max. Recorded H2S on Pad/Facilit MPH-06i 2.6 m 4/15/2000 Other Relevant H2S Data Schrader wells have not had si nificant levels of HZS. Anti-collision Issues • MPH-17 passes the Major Risk Criteria. Distance to Nearest Property • MPH-17 is planned to be 2862 ft from the nearest unit boundary. Distance to Nearest Well Within Pool • MPH-17 is 290 ft from the nearest reservoir penetration in the MPS-21 Top OA. Page 5 . , ~ ~ DRILL & COMPLETION PROCEDURE Pre-Riq Operations 1. The 20" conductor has been installed pre-rig. Drillin : 1. MIRT and NU Diverter. 2. Function Test Diverter, PU 4" DP and BHA. 3. Drill 12-1/4" surface hole to 4795' MD / 3070' VD below shallow coals. 4. Run and cement 9-5/8" surface casing. 5. ND diverter, install wellhead and NU/Test BOPE. 6. Drill 8-1/2" hole to intermediate casing point at 8896' MD / 4161' VD below base of NE. 7. Run and cement 7" intermediate casing. 8. Drill 6-1/8" Horizontal Interval. ,~-~--°~ 9. Run and set 4" Screens. ~~ , 10. Run a 4-1/2" single selective injection string. ~' ~`^~-~~ ~~ ~`~~~= ~`~~ ~ 11. ND BOP/NU Tree. ~ 12. Freeze Protect With Diesel ~3° 13. RD & MO Doyon 14. Page 6 ~ ~ ~ i ~ i sao'SS" ~ ~ ~ ~ i r i ~ z i J ~ p a ~ i i ~ i I i i i i ~ ~ ' i -N- ' ~ , I ~ i ,, ~ ~~ ~ ~ , i ~ ; H-14^ ~ ~ ~ H-13~ ~ I H-12 ^ ~ H-11 ^ ~ H-10~ ~ ~ ; H-9 ^ 1 ~ ~ , / ~ , , , , ~ , , , , / , , , , , ; , , , , ,/ , , , , ;' , , , -------- , ;, , ------- ; / ~ ; ;, ~ %' MPU H-PAD ~ , NOTES 1. DATE OF SURVEY: JULY 24, 2004. 2. REFERENCE FIEID BOOK MP04-02 pp.17-21. 1. ALASKA STATE PLANE COORDINATES (A.S.P.) ARE ZONE 4 ALASKA, NAD 27. 2. PAD SCALE FACTOR IS 0.99990364 3. HORIZONTAL CONTROL IS BASED ON MPU H-PAD MONUMENTS H-1 AND H-2 J RAD' n 2g 27 1 ~, 28 \I° ~ ~ ~D -~ ~ ` H PAD ~~~~ ~i ~Z S~ ~ c~ 1 VICINITY MAP N.T.S. LEGEND ~ AS-BUILT WELL CONDUCTOR ~ EXISTING WELL CONDUCTOR OF ,~~ A ~~ ~Poooo,eoaa ~ ~49~ ~o `~~, icha F. Allison ~o~ 0608 0 0,~ ~~ °° ~ ~ior~a- ~ SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF JULY 24, 2004. LOCATED WITHIN PROTRACTED SECTION 34. T. 13 N., R. 10 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION N0. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS H-15 Y= 6,010,091.32 N= 1,409.85 70'26'17.584" 70.4382178' 35 $ 2 940' FSL ' X= 556,633.05 E= 879.91 149'32'17.602" 149.5382228' ' 4,011 FEL 16 H Y= 6,010,120.38 N= 1,440.03 70'26'17.869" 70.4382969' 36 2 2,969' FSL - X_ 556,641.19 E= 879.89 14932'17.356" 149.5381544' ' 4,003' FEL 17 H Y= 6,010,149.22 N= 1,470.03 70'26'18.153" 70.4383758' 35 7 2,997' FSL - X= 556,649.44 E= 880.04 149'32'17.108" 149.5380856' ' 3,995' FEL ~$ Y= 6,010,178.19 N= 1,500.11 70'26'18.437" 70.4384547' 6 35 3,026' FSL H~ X= 556,657.51 E= 879.97 14932'16.865" 149.5380181' . 3,986' FEL CHECKED:JACOBS ~ ~ - n- --- - ~~y~~~M~~~ b gP EXPLORATION ~ I II I a DATE: I,:J 7-27-04 U m~~ ORAWING: FR604 MPH 01-00 MILNE POINT UNIT H-PAD SHEET: ~ ~~~O~o J~B N~ AS-BUILT CONDUCTORS 0 7-27-04 ISSUED FOR INFORMAiION KWH JJ SCALE: NO. DAIE REVISION a~ CHK µ~.~. ~.~~ ~~RS ~• _~so~ ~LLS MP H-15, H-16, H-17, H-18 °F • H-, s -~- H-, ~ 1 ~ H-16 3o'(rYP)~ H-15 ~ ^ H-4 ^ H-5 ^ H-3 ^ H-6 ^ H-2 ^ H-8 ^ H-1 ^ H-7 ~ ~ P BP Alaska Milne Point H-17 PROPOSED WELLBORE DIAGRAM All Dapths a re in it WELL NAME: Mlln@ POlflt H-17 PREPARED BV~. Stephen L. Ward DA7e. 1-Mar-07 MD (h) ~ ND (k) Angla UPDATED BY~. D Johnson 10.Ma -07 TD (h) 12510 KB (N) KB-TSF (N) . . ~ ..... . PBTD (ft) GL (ft) KB-CF (k) ~ I ~ Casin lTubin Size in Wei ht 7NN addConn~ctl De th k , Surface Casing 9.825 47.0 4,785.0 ~ Production Casirg 7A 29.0 L-80 8,898.0 2d90 1978 82.0 J Tu6ing 3.5 9.30 L80/IBT-M 12 510,0 aou ' ~xz~ sa.o ° 4785 3070 82.0 ° TUBING STRING OETAI LS: h OP H 8000 984Y I 82.0 ° 1 83 - 3.5" 9.3 # L80 IBT-M Wbin joints 2490.00 3.5 2.992 0 2 1- 3.5" GLM wilh fbw pups 18.00 2490 8700 3888 83.0 ° 17 - 3.5" 9.3 # L80 IBT-M tubin joints 510.00 3.5 2.892 2508 ~ 3 1- landin nipple with flow pups 10.00 3.5 2.813 3018 4 B9 - 3.5" 9.3 # LBO I8T-M tubin ~oinis 2972.00 3.5 2.992 3028 7500 5 1- 7" packer 10.00 8000 ~ 8 17 - 3.5" 9.3 q LBO IBT-M wbi - ints 90.00 3.5 2.992 8010 NB Sand~ - 7 In eclion mandrel for NB Sand 18.00 8100 ~ 8 8- 3.5" 9.3 # L80 IBT-M Nbin ~IS and seal ass 1800.00 3.5 2.992 8118 7800 ~-~ 7" Packer w/ PBR 30.00 5.880 2.992 7918 7918 ' A729 85.0 ° 8070 -~ NE Sand a` Lower O en Hol e Com letion Details: Actual Se uenca and Nu ber De endent On Lo Evaluati on 8H0 8728 4747 86.0 ° -- ITEM DESCRIPTION IENGTH ft OD in ID in Top at h 8898 4780 88.0 ° ~ ~ 1 7" liner Packer w/ PBR 30.00 S.BBO 2.992 7918 _ -- 2 2- 3.5" 9.3 # L80 IBT-M tubin -oints 60.00 3.5 2.992 7948 9738 4179 86.0 "-~ 3 1- Reslink Reslnject screen 30.00 3.500 2.992 BOOB 4 3- 35" 9.3 # L80 I8T-M tubin ~oinis 90-00 3.5 2.992 8038 Realniect Screen ~hs i 5 TAM FreeCa 1 Packer in 7' W? "XN' Ni e 18.00 S.B80 2.992 8128 Nmr ~. I 4 to B Tam Froe Cap packars 6 7 8 33 - 3.5" 9.3 ri l80 IBT-M tubin ~oints 1- TAM FreeCa 1 Packer w/ "XN" Ni le 5- 3.5" 9.3 H L80 IBT-M lubin -ointa 985.00 18.00 505.00 3.500 5.880 3.500 2.9B2 2.982 2.992 8748 9131 9149 ~ ~ Wlth , 9 1- Reslink Resin~ect screen 30 00 3.500 2.992 9854 / Rsslink Realnjact Sereens 10 1- TAM FreeCap 1 Packer w/ "XN" Nipple 78.00 5.880 2.982 9684 ~ ~ 11 5- 3.5" 9.3 # L80 IBT-M lubin oints. 150.00 3.500 2.982 9702 12 1- Reslink Reslnject screen 30.00 3.500 2.992 9852 ~ 13 1- TAM FreeCap 1 Packer w/ "XN" Nipple 18.00 5.880 2.992 98ffi ~ ( 14 5- 3.5" 9.3 p LBO IBT-M tubin ~oinis. 150.00 3.500 2.992 9900 I ~ 15 1- Reslink Resln~ect screen 30.00 3.500 2.992 10050 18 5- 3.5" 9.3 # L80 IBT-M lubin ~ ints. 150.00 3.500 2.992 10080 ~ ~ ~ 17 1- Reslink Resln~ect screen 30.00 3.500 2.992 10230 I 18 5- 3.5" 9.3 q LBO IBT-M Nbm oin[s. 150.00 3.500 2992 10260 ~'~~ ' ~ ~ ~ 19 20 21 1- Reslink Reslnject screen 1- TAM FreeCa 1 Packer w/'XN' Ni e 12 - 3.5" 9.3 fl LBO IBT-M Wbin ~ in[s. 30.00 18.00 360.00 3.500 5.880 3.500 2.992 2.992 2.982 10410 16M140 10458 ', I ~ 22 1- TAM FreeCap 1 Packer w/ "%N" Nipple 18.00 5.880 2.992 10818 _ ~ 23 5- 3.5" 9.3 # L80 IBT-M tubin ~oin[s. 150.00 3500 2.992 10836 ~' ~. 24 1- Reslink Resln ect screen 30.00 3.500 2.992 10988 ' 25 5- 3.5' 9.3 # L80 IBT-M tubin -oints. 150.00 3.500 2.982 ll 016 i ~ 28 27 28 1- Reslink Resln ect screen 1- TAM FreeCa 1 Padcx w! "WJ" Ni e 5- 3.5' 9.3 # L80 IBT-M lubi - ints. 30.00 18.00 150.00 3.500 5.BB0 3.500 2.992 2.992 2.992 11166 11198 11214 -- ~ 29 1- Reslink Resln ect screen 30.00 3.500 2.982 11384 ~ I 30 5- 3.5" 9.3 # L80 IBT-M tubin -oints. 150.00 3.500 2.992 11394 I 31 1- Reslink Reslnject screen 30.00 3.500 2.992 11544 ~~ ~ __ 32 1- TAM FreeCap 1 Packer w/ "XN" Nipple 78.00 5.880 2.992 11574 ~, ~ 33 5- 3.5" 9.3 # LBO IBT-M lubin oinis. 150.00 3.500 2.892 11592 '~ I 34 1- Reslink Resln ect screan 30.00 3.500 2.992 N742 , i 35 5- 3.5" 9.3 # L80 IBT-M tubin ~oints. 150.00 3.500 2.992 11772 ~ I / 36 37 38 1- Reslink Rasin eci screen 1- TAM FreeCa 1 Packer w/ "XN' Ni e 5- 3.5" 9.3 # LBO IBT-M tubin ~oiMS. 30.00 78.00 150.00 3.500 5.880 3.500 2.992 2.902 2.892 11922 11852 11 W0 ~ 39 1- Reslink Resldeq screen 30.00 3.500 2.992 12120 i 40 5- 35" 9.3 # L80 IBT-M Wbin -oims. 150.00 3.500 2.992 12150 i I~ 41 1- Resllnk Resln ect screen 30.00 3.500 2.992 12300 ~~ ' 42 5- 3,5" 9.3 k LBO IBT-M tubin -oints. 150.00 3.500 2.992 12330 ~I 43 1- Reslink Resln ecl screen 30.00 3.500 2.992 12480 , ~ 44 1- 3.5" 9.3 # L80 18T-M bullnose. 1.00 3.500 2.992 12510 TD 12510 Commenh: 7t570 t786 90.0 ° ~ Actual Number and Spacing of Packere snd Screena and N-Sand Peforations Dependant On Log Evaluation ~ ~ 00 ~ ~o~ ~ _ g r-~ ~ '~ L L ~ , a~e ¢ ~ O :c -~ ~ '~ ~ ~~ cn a ZF ~ ~ a v -o a v, Z - n n n r n - - - - - - = ¢ q ZZZ 4LUN~?NO 2~N[r.LLL[7LS7m ° ~ a ,\ Q F' ' ' ~ ~, < ~ f F ` : . p ci m~-~-mmmmF v S ~ ~ 3 _ ° y O~ .J ~, > y -' '".°Vi _~= v~i~ ~p 00 .. ~n~D.~p0~0~~ ~ N F u7p ' ~ v'- '' Z a i~ c a ~ F Z ~ $ ~v Q ~n°oov~i~M~ p ~D~1/°O1rR~~D ~ ~~n ~ a or. e ~ ~ ~ n v~v~r,v~v,~e,e,o,enrn~mm v~i eo~ ° F ~ rvv i o o ~ ~ _ ~ i ¢ u Pav~ ¢ ~ a .9 z ~ ~ ~ vo°Oe°ea°.e°°ea°e:~°ee°.°ea~°om~°eoe°en°en eNee eero'ePOO ~ma P ~ ~ ~ ~ em=~ ~ O A d °o,°o,o°opooS ~ P~ g n 'S ~ F e e~ r . . a ~ •• n ~ ~ _ ~ ~ oc°S "' ~ ~O~DTNe ~fm -n~~vvv ~ ~ ~ ~ ~ . _ ~ S eNeeeeoeoeeeeeoeeeeeeoo Oe^pnvioeeeeeeveeeeeeoooee nnoeeneee.ide-i-iovae~rev Q °.°c,~OO ~ o-- ee o Ov o ~, o. Q ~ ~~~I a ~v ° fn T ~ & O ° ~ z ~, z ~Nenvv~~Dh Q(] ~ ~ O~ Q ' 'E A ~ ~ ,g .. Q ~ ~ ~ 3 , ~ , ee~ _ ~e~~~~~~~~~~rnr~mme~~°h OCrieaer'ir~rvOwr~i~f-.~~CaePTC~CCri1~ _~DO~~~_a~_m_~~~~o..~_a ~~ _o=m..~~ a .. _ ~ ~ ~,O ~ P P~P y d~ ~ q ~ .~~~~,.~~.~~~r~,.~.~~r__ A --- , ¢1 ~ 3 Vi ~f~o~O~a00~nN1n,OVNNmYmP~nO "' •n ~•v;~ ~ z O ~ ~ . . . . ~ - ` ~"~~{27 ~ T ° ~ * o n. M a~e~ mmewanr~v',w_ =~n~.~aa~~a_~maa~~. ;_$°.~ ~ ~ ~ . ~ m ~ ° ti m~ - o Z mm ~^T'tT ~ ~ ~ , ~ ~ ~ ~ ~ i ~ t r "C ~~ , ,aoN d ~~ ~~ m ~ '~ ~ ~ ~p~Y.p_~SOO~OnPPOPO~O70~OmPg O ~ ~ . f i ~ . . . . N ~ ~ •p ~ . 8 ~ ~ ~I PViP~ma0~00TT~~~~~~~vT~RV~ r ~ n a e ' ` ~ ~< C - Q ~ 4L N '" ? = ~ ~eeoooe~~a ~~nnvlv~hmmo ~ ~~.^~.^.~~~~.°'emmme~°~.ac===«««.~,.«.~,. ~ ~ L 0 I ~ . - ~. ~' . . ~O ', . ,., ~ oa~:, P a ~ , v~ ; ~ ~~ Ll ~ i ~ a __ ~''g' = x = oo.~es~m~~$e~~$ ~~~~~m~e .V~~e~e~~m~ea~~aaaaaa~ma J Q ~ L f I~ ~~ ~ i~ ' ~n I~ ._-f w > y a == =Y ~~ " ~ ~ ~ z a o L eoeo«-....,orr,~ar~m_~e-~e~r..,v,~ .~eeoan.~.a..r~v~m-.rm~rv,mo,o~nc~.m 'ee ' '~o6v . . .~r . o ..~v, $°maa,~e.°ram~:: ' $ ~ ~ ~ Q ~ '. ~. . ~ i ~ ' ~ :, ~~~, n ~. . O - ~ ~ ~ _ .._, - ... . , . ~ ~~ ~ ,~. :rr n ~m ~ m ~ . . ~ . a . . ~O ~ . . . . LL V i ~Nn7V~~O1~a0P . ....~~....~~.~ ~NNNrrvr v . . . . . . ~ . , . . . $ ffi' ~ M ~ ~ _ ' • ~ - ~ ~ ! :~ ~~ ~ --.. ~ 6 a. ,~,: ~ . . . . . . . . , . . ._ L..~ ~ 1 ! . ~ . . i I ~ .~: . ~ ~ . ~. . o , i , . . _ t ~ Z 2 t~ S a e ~ ~ ~ ~ q h ~s3^ °i~Z ~ o 0 0 0 0 0 ,.,u c. -nmao.. m.... eo~a.. «.. ~ T~ T g T G G T T O O O ~ ~,d„ „<,~ ~ a o 0 0'0 0'0 ~o 0 0~o ~o ~o 3 ~~-~ § v, aaaaaaao.aaaa ~ ~ .~i3~~5 ~a o0000000000- ' Z 3..irnnF .g o00000000000 . ,E' V~~~~ oaOPOOaO.pOV~v~ a A ~,ooo-~,~M~~ ~ e..~~$ W ^~ooSb~~~,~~~ ~~~~~~~ ~~~~o Z~~g~ ~° oooooo~oo~oe _ ~NOOaoooooo~. :~ ~o~o~~~~~o~ °-~U C ~ orococa.c- ~=~~ o :rm~nNOOmo~-a.nn Eu'^~ Z o0000000000°0 o> ~ooooo000000 b F ; .o .o .o .c ~o .o ~o .o ~o ~o .o u q> p¢. 3 c-ri.-.v,moov,nooo- F {~ OR1~a0N~OV~O~oOQ~~t~ p ~ ~ ^r ~NN~PMVINNW O W + --n.rnr'"n~=°.n°Orl°M.n~ Ll K ~ ¢ Vl M O~oOPV~O~oOPV~vI G ~.., vnmaov,vc-v,o.o ~$ Z ~cmm~an~-.~on~~='.~p S:n ~crv~nao-.nnio~-ma p ~ rornrnvivim j Z .5 '~ ~ ~ ~ ~ ~ ~ ~n ~o r .o v, p 9 U N U ~~ O o O O O O o O O O O a Q g ; o00000ooooos ` p. ooo.omc~n.n..i ~ O V'j PTNPPN~O~O~OI~PO O K SC~e~°' ~in°o°a°vcovvveo ~ >• ~ ~_~-u~ ~ d N ~ m .~q ~ ~ ~ ~ ~ ~^I N Pl Nf .1 ~ .~y~J: ~+~ ~y~~.>~ f i g 5 g r > > ~ > > ~ ~ - U j'~ ~ I ~0~~ w[iciF-HI-P+~iWF-FF 3 ~ '~r~~nnrn rr~~ o_~~__^~ aaax°"'rSSTTS'S - ~ ~~~~o~~~~~~~ ~ ~ Ia!/t300011 41da4 ~eaiuap anil O ~ p p O O ~~ .. e0 _ C ° ~ ~ 0 ~ 0 ~ itl o.~ ~ o o ~ T ~ 0 c n ~ 0 0 0 ~ 0 o° ~ ~ ~ N d G C G O O O . . . .. ~. P ~ ~ z O O O O O O y ~_om.. ca«.. ww«.... t~ TTC TG.S.-A.~.Q.S.~ L O O O O O O O O O O O O . . . . . ~ . . . . . . . . . . . , ~ . . ~ . . . . . . . . . . . , . . . . . . . . . . . . . . . . . ~ N v ~ 3 'O V l L4L6.L44L444a ~ ~ ° ~ 3 ~ . ~ o0000000000- 9 000000000000 " o . . . . . ~ ~ ' . . . . . . . . ` i ~ I._~- ~ . . . . . . ~ . . . . . . . . I ,. . ~ ~ ~ l ~ ~~o~~ 'a_,ooo N ~n r~1 N 1~ 7 QON.nt~~nvinP i ', . I I . ~ , ~ ~ I I ~` t I ~ I I I ; ! I 5 ~ ^ mO000mPmO~PP ~hhhNHV~ihhhh N N .. . . , .. ~, . . . . . . . . . . ~ . . . . . . „ . . . . . : . , C ~ Z . . . . . . . . . . . . . . ~ y .~ % %D O O O O O O O O O O O O q O O O O O O O O O O O N . . . . . . . . . . . . . . . . . ~ O ~ '~L • O z W^mO1~OV~mNV~OQ OnO~fOPP~O~ R \~ GIOOCO ~d M . , . . ~ ... ~. . . ., . .. . ^ _ I + CMNe O O O O O O O O O O O O oooaooooo00o . ~ A r ~~~ I ~ ~ y y ~.S v p ~ H ~~~~~~~~~~~~ ~ ~ ~~ ~~ P O ~ -~~ , . t-k~ ~ m ~ y a ui ~~O ~ R~N~vimmvirnOm~ ~ 3 oc~oo~i,o~ncmv_n v~ ~ w ~ NN~PN NNW ~ > a !- ° ~ ~ Q ~ O (] ~ . . ~. . . ~. . . ' . ' ~ ; ~ C v i i 1 MV~OaO + ^M ~t M O pp~ n P P ~ ~ I . I. g ~ 1~7 111 U ~ ... r+ie il M N ~ ... p a . P ~ V ~ '~ , ,~ P - Q t ' ~ ~ I ~ yyy 3 ~ N ~ Q VI r1 P a0 P v~ O 1~ 00 P v~ v~ ~,,,~ Q~aOPO~nQP~v~O~D ~ '^ @ T ~ Q C O '.j O~ - a _ ~ ~ p Z ... ~ IZ ~GaDPI~aO~D1~RN~OrnO 4 ~o0o0~Pl~-~Or(~.-.~O O~~nNP- U r ~ . .. - ~ Q ~, G ~ '~ ~ N O G f~ Q . . . . ~ '.Ie ~! +~MV~~nm~n~DI~~OV1 ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ " ~ (a ~ ~ ~C . . . . . O ~ .. ~ o ~ - 0 P ~ ~~ 3 ~ (~ O O O~ O O O O O O O O ~ o00000000000 ~ ~ ~ ~ ~ ry =' m' - ~ ~ ~ „ ~ ~ ~ a ~ + ~ P ~ aP~~~G~rPO ~doo------~ . . o .. eT o ~ g ~ O ° 0 ~ ~ ~ N N~ N + ~~ ~ Vl z = ~~ ~~K~~a~~e~ee , ~ . . C . . .. W . ^ ~ ~ ~ ,O ~ N C ~ 9 ur rn e - ~ .:. p " ~ ~ '` '` " %-.~ O ,- p ~ .. p o • [~ 7 o V~ 8 m I-~ u$ ~ ...«v L..~~ ~ ; ; -- z _. ,. ; ', ~ ~ ~ ' ~ ~ o ~ ~ I ~ ~ V I ~ ~.C ~, W ~. (~ ~ ._ .. L ` ~ - a P o ~ P ~' no ov A m ct u. n. F'" F F v, u. 1-~ F I-~ ~ p~ ~' o ,. , ~ ~' ~ ~ ~ ~ Q ~ ? ~ y. S f r3rrrrrnn ____ °______... q STTSaxSSSYwx . . . ~ l .` ~._ ~ ~. ~. ~' r~ ~ - " I ` in ~ ~ v ~ ~ _ ~ a F - ~ ~ ~ c4aaa $aa.aan.aa ~~~~ ~ ~~ . . . , ~ . -~ ~~ ~ ~ . ~'N a " ' e z a z E~ ~E ~ g ~ ~ , . f b a~ ~ U n Nl ~' r~1 ~ ~ p( O T ' / ~ .. I ~. .~ I~ I' • ~ ~ DJ rv N~ a F1- Q _ . L p V . . . , ', I . . ~ ° r ~ r _ _ . _ . . ~ . p L ~ C~ ~ ^ ~ ~ r I-~ _ - ~ ~ ~ y Sa ~~ . . . : ~ r~p~ ../ _'ro v 2M _ ~ a F ~ . . iO `. ; :... _ • - o z _ ~' ~ ~ a ~~ I-- ~ 1 . . 'n ' °~ ~ ~ S ~, I ~~ ~ O ~ + ~3 vi o. a ~ . . . , ... . . . . C] . . ~ . . . . . . ~ _ ' 2 , , . o . F ~ ~ ;~ o $(y ~= Ll ~_ . . . ~~~ ~ ~ ~ ~ . ~• ~. . - . . . . . . . . . . ; i ~ i . . . h ~ . ~ .. i~ , . - i'. 3 P 6 ' ~ _ c ~.~ ~:~ I ~~ ~ II ~ ~ ~~ ~ _ _ ~ 9 , . .' o ci y a . . . . ~ . , . . . ~~ ! p Q .~ . . . . ~ ~ N ~ f ~ 0 . . . . . ;. ~ ` . . . . . . . a ~ ~ I ~ '..,~~ I f { ii ~ . ` I l f ~ I ~ . . ~ _ ~ ~ C , : : ~ o Z a ' ~ . . . . . . . . . ~ ' . . F F F F F F y C F, . .~ o . . . G . . . . . . . . . . . ~ . . . , . . . . . . . . . . . ~ ~ n r n n n n ~ ~ ~ ~ _ ~ 5 S S S S 2 o o a c c e. a ` ~ ~ ~ F C F L Z ~ r' _ ~ - pO~ ~ . C .. O C F > ~ ~ F o~DO o ^ . . . ~ . I ~ . I , . . . . . . '. ~ ' . _. . i I~ ~ . . . ~~. ~ li ~. ~ _v~nv,.°.a~o~o~~m~' 'a~~v00i,$ °o°on=oe.v..~ ~r-$= oos~.~id~~°:eerd-~o~.ieo~.:aee:aa 'r ~$v r~,o~~$~n~~°mm ~ ~z ~ ' ~ = ~ Q _ . . . . . ~~ - ' ~r,vi ^= n~ 5 t- ~ ~ ~ ~ ~ ~ I 3 z C u~=~ ~ ~~`+~, 3~ -' ~~ ~ . P ? ,~ ~ ~ ~ ~=~, ~ . ~ . } , } I~ , I T I ( ~ ~, F O ~D 00 r~uOPOP~Om~00000rOr e vaem _ "' , m _ _ a ' ~ ~fq ~ ~ °' .. ~$ o ~ ~ ° ~' ~' o _ ~ : . , a ° ° ° e° ° ° ° o° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ~ ~ ~ y y ~~,,,, ~ o v ~n O '~ ~ . as G e e e e e e o ev ~v ~v ~v e e o e e e e o ee . e ee-«~ne-resese-rne-roeo.re~ren oc oCc~Kc~r~ ~' ~u0> c.~ ?~~g ~ .. p g „ , ~ ~, ^ ~ ~ ~ e G ~ W ~ ~ . . . . . . _ . . . . . . . . , ~ ~ 5 Q ~- ~ + a..e°$,v°~i,.°yi rv~Oi=.-°,mnvmi, e~N'm,wa.r~er oe _ ~~esa~_~_»~~~5«~_a ~~~~^~ - _V~ ~ ~ _ ` Q , i ' ~ t~ o ~~~~~~~ °°~~== ^ . E u~' ~ C ~ + . . . . . . . . . . . . . . O ~a n ~oo ~, y ~~~~n~a~':~~~=~e~~'a~=~~ V ] . . . . u N ~DO~n {Y ~2 O OPrinv~PriaC~O^aCeCCeePw~V~VVO~~i~ m ~ Vl PI~Q ~ ~N~~aPV il~P~nmPO~~ ~Vnn r~ w1 ~f Y~ V~ 1~ m a0 ~ ~ . . . . . . N ~ ~.9 ~ ~u ~' O ~ ~ •~ ~ . 'I .. •- . . , . i . ~_ . ~ ~ . . . . ~ . . . . c QO c =o a v, o :?QroUm o ..N.7 P ~ n~PV~jMO00TOrv ~O ~O a~pPO °n$~in$ r$$= ~e ~~~~ a .. eavw i a~giasa~e J a ~'u Q 9`~ , ~N~;m 3 y~ ~~U~~.Y ~ M YI ~ . ., , . . . ~ i .~, ~. . . . . I. ~ A ~u2Z~2Q F € sNiiu.uJtiio7 o a~mmmcovi ~ k. CDFVIVINNI-~ a y ' ' ~ ~ ^. = ^ z ai~v ,~ °ee°eo°OO°e°e°e~~a°,°an:~eZ~~~n~nv~y°mm°°e • Gvi enmHSe~mmm aPae~ } ~ F~~I-u-iK' ~ C . . . . . . . I . . . y V ~ n ~~~ ==^=~~~ ___ _~_« nnnr ,~ y Q L mOm~n n % V1 OOM y F O p~ ~~'g ~r L~L~~i ~HF~nf M y1 ' ~ I . n. n F a~..;oc.c.~;co 2 ~~o-~nrao.c O arvemori ¢ arn~ V ~ roo~i ~ eoo- ~ °e$e°Oe~mm~~$'e~$°e~~°ea°~aaaa'e.~$ een .. ....... .... rrh~o~oAme~emabmaaaaaamw~ „ o ~~~ ~ ~ , ~. ~ ~~~~~~~a ~ `~~~ J ~ saa ~ eo o ~ _~~~ ~~~_ ~~:~ m~ e "= ~ 3 V J ,, L a ~1 $ o00000o a o-,~no~„ooo O~OPrIMOO Q (] m 00--- G °°~.~DC > O~~ F ~ a ~m$ = ~ss~ u, ~ w~«sm$$~$CY.f HrVhV~l~ maC PPO000~~~ ~ ~ ' - ~ M eev~re ad j a ~ ° _r, z ~,e~ ~~ z -~~, Vl ~n~fTN~OraP~~-~~~~~~Prvrvrvnrn ~ ~ Sperry-Sun BP Planning Report Companyt BP Amoco Date: 4/26l2007 Time: 12;36:46 Page: 1 Field: Milne Point Co-ord[nate(NE) Reference;. WeIL• P~an MPH-17, True North Site: M Pt H Pad Vertical (TVD) Reference: 35.7 + 34.3 70A We1L• Plan MPH-17 Section (VS) Reference: Well (O.OON,O:OOE,169.13Azi) Wellpath: Plan MPH-17 Survey Calculation Method: M inimum Curvature Db: Oracle Plan: MPH-17 wp10 Date Composed: 2/27/2007 Version: 53 Principal: Yes Tied-to: From Well Ref. Point Field: Milne Point North Slope UNITED STATES Map SystemliS State Plane Coordinate System 192 7 Map Zone: Alas ka, Zone 4 Geo DatumiJAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum:Mean Sea Level Geomagnetic Model: bggm2006 Site: M Pt H Pad TR-13-10 UNITED STATES : North Slope Site Position: Northing: 6008971.91 ft Latitude: 70 26 6.665 N From: Map Easting: 555404.91 ft Longitude: 149 32 53.895 W Position Uncertainty: 0.00 ft North Ret'erence: True Ground Level: 0.00 ft Grid Convergence: 0.43 deg Well: Plan MPH-17 Slot Name: Wetl Position: +N/-S 1168.15 ft Northing: 6010149.22 ft Latitude: 70 26 18.153 N +E/-W 1253.36 ft Easting : 556649.44 ft Longitude: 149 32 17.108 W Position Uncertainty: 0.00 ft Casing Points MD TVD Diameter Hole Size Name ft ft in in 4794.49 3070.00 9.625 12.250 9 5/8" 8896.00 4160.90 7.000 8.500 7" 12510.37 4166.00 4.500 6.750 41/2" Formations MD T'VD Formatlons Lithology Dip Angle Dip Directlon ft ft deg deg 2165.58 1820.00 BPRF 0.00 0.00 5913.10 3601.00 TUZC (Ugnu) 0.00 0.00 7258.81 4063.00 SBF2-NA 0.00 0.00 7476.55 4090.00 SBF1-NB 0.00 0.00 7843.71 4122.00 SBE4NC 0.00 0.00 8004.35 4136.00 SBE2-NE 0.00 0.00 9260.37 4188.00 TSBD-Top OA 0.00 0.00 Targets Map Map <---- L~titude ----> <=-- Longitude --- Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft MPH-17 Fault 1 2593.00 -1676.43 1711.04 6008486.00 558373.00 70 26 1.663 N 149 31 26.899 W -Polygon 1 2593.00 -1676.43 1711.04 6008486.00 558373.00 70 26 1.663 N 149 31 26.899 W -Polygon 2 2593.00 -116.90 2061.93 6010048.00 558712.00 70 26 17.000 N 149 31 16.589 W -Polygon 3 2593.00 -1676.43 1711.04 6008486.00 558373.00 70 26 1.663 N 149 31 26.899 W MPH-17 Fault 2 2891.00 -2288.73 1872.41 6007875.00 558539.00 70 25 55.641 N 149 31 22.168 W -Polygon 1 2891.00 -2288.73 1872.41 6007875.00 558539.00 70 25 55.641 N 149 31 22.168 W -Polygon 2 2891.00 -1499.72 2673.50 6008670.00 559334.00 70 26 3.398 N 149 30 58.654 W -Polygon 3 2891.00 -2288.73 1872.41 6007875.00 558539.00 70 25 55.641 N 149 31 22.168 W MPH-17 Fauft 3 4028.00 -3589.89 3451.72 6006586.00 560128.00 70 25 42.839 N 149 30 35.846 W -Polygon 1 4028.00 -3589.89 3451.72 6006586.00 560128.00 70 25 42.839 N 149 30 35.846 W -Polygon 2 4028.00 -3459.68 3952.77 6006720.00 560628.00 70 25 44.117 N 149 30 21.144 W -Polygon 3 4028.00 -3589.89 3451.72 6006586.00 560128.00 70 25 42.839 N 149 30 35.846 W MPH-17 TO Rev 1 4090.00 -3977.98 3720.81 6006200.00 560400.00 70 25 39.021 N 149 30 27.957 W Geo Poly 1 4090.00 -5098.09 3321.25 6005077.00 560009.00 70 25 28.007 N 149 30 39.693 W ~ Sperry-Sun BP Planning Report \ J Company: BP Amoco Date: 4/26/2007 Time: 12:36:46 Page: 2 Field: Milne Poiot Co-ordinate(NE) Reference: WeIL• Plan MPH-17, True North Site: M PtH Pad Verti cal (TVD) Re ference: 35 .7 + 34.3 70:0 WeIL• Plan MPH-17 Section (VS) Refe rence: Well (O.OON,O. OOE,169.13Azi) Wellpath: Plan MPH-17 Survey Calcula tio n Met6od: Minimum Curvature Db: -0~acle Targets Map M~P ~'--- Latitude ----~ ~--- Longitude --_ Name Description TV D +N/-S +E/-W Northi ag Easting Deg Min Sec Deg Min Sec' Dip. Dir. ft ft ft ft ft ' -Polygon 1 4090. 00 -5098. 09 3321.25 6005077. 00 560009.00 70 25 28 .007 N 149 30 39. 693 W -Polygon 2 4090. 00 -5896. 49 3098.16 6004277. 00 559792.00 70 25 20 .155 N 149 30 46. 246 W -Polygon 3 4090. 00 -6731. 76 2855.78 6003440. 00 559556.00 70 25 11 .942 N 149 30 53. 364 W -Polygon 4 4090. 00 -7238. 48 2547.89 6002931. 00 559252.00 70 25 6. 959 N 149 31 2. 397 W -Polygon 5 4090. 00 -8308. 04 1287.61 6001852. 00 558000.00 70 24 56 .444 N 149 31 39. 357 W -Polygon 6 4090. 00 -8558. 36 1588.75 6001604. 00 558303.00 70 24 53. 981 N 149 31 30. 530 W -Polygon 7 4090. 00 -7427. 18 2900.50 6002745. 00 559606.00 70 25 5 .102 N 149 30 52. 060 W -Polygon 8 4090. 00 -6883. 55 3220.67 6003291. 00 559922.00 70 25 10 .447 N 149 30 42. 665 W -Polygon 9 4090. 00 -6048. 48 3488.05 6004128. 00 560183.00 70 25 18 .659 N 149 30 34. 813 W -Polygon 10 4090. 00 -5238. 21 3729.24 6004940. 00 560418.00 70 25 26 .627 N 149 30 27. 728 W -Polygon 11 4090. 00 -3813. 71 3951.08 6006366. 00 560629.00 70 25 40 .635 N 149 30 21. 199 W -Polygon 12 4090. 00 -3778. 56 3536.30 6006398. 00 560214.00 70 25 40 .983 N 149 30 33. 367 W -Polygon 13 4090. 00 -5098. 09 3321.25 6005077. 00 560009.00 70 25 28 .007 N 149 30 39. 693 W MPH-17 T0.1 4150. 00 -5176. 55 3511.68 6005000. 00 560200.00 70 25 27 .234 N 149 30 34. 109 W MPH-17 T4 rev .2 4166. 00 -8317. 40 1597.58 6001845. 00 558310.00 70 24 56 .351 N 149 31 30. 270 W MPH-17 Fault 4 4168. 00 -5264 .97 3038.95 6004908. 00 559728.00 70 25 26 .367 N 149 30 47. 975 W -Polygon 1 4168. 00 -5264 .97 3038.95 6004908. 00 559728.00 70 25 26 .367 N 149 30 47. 975 W -Polygon 2 4168. 00 -6097 .47 3749.71 6004081. 00 560445.00 70 25 18 .176 N 149 30 27. 140 W -Polygon 3 4168. 00 -5264 .97 3038.95 6004908. 00 559728.00 70 25 26 .367 N 149 30 47. 975 W MPH-17 Fault 5 4169. 00 -6972. 18 1853.83 6003192. 00 558556.00 70 25 9 .580 N 149 31 22. 747 W -Polygon 1 4169. 00 -6972 .18 1853.83 6003192. 00 558556.00 70 25 9 .580 N 149 31 22. 747 W -Polygon 2 4169. 00 -6995. 00 3409.85 6003181. 00 560112.00 70 25 9 .351 N 149 30 37. 119 W -Polygon 3 4169. 00 -6972 .18 1853.83 6003192. 00 558556.00 70 25 9 .580 N 149 31 22. 747 W MPH-1 P T3 rev .2 4175. 00 -7176. 59 2826.40 6002995. 00 559530.00 70 25 7 .567 N 149 30 54. 230 W MPH-17 T2 rev .2 4193. 00 -6813 .05 3024.18 6003360. 00 559725.00 70 25 11 .142 N 149 30 48 .426 W MPH-17 T1 rev .3 4203. 00 -5960 .65 3280.71 6004214. 24 559975.01 70 25 19 .524 N 149 30 40. 893 W Plan Section Information MD Ind Azim TVD +N/-S +E!-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/10Qftdeg/100ftdeg/100ft deg 34.30 0.00 0.00 34.30 0.00 0.00 0.00 0 .00 0.00 0.00 200.00 0.00 0.00 200.00 0.00 0.00 0.00 O .QQ 0.00 0.00 400.00 3.00 135.00 399.91 -3.70 3.70 1.50 1 .50 0.00 135.00 520.00 6.00 135.00 519.53 -10.36 10.36 2.50 2 .50 0.00 0.00 920.92 20.00 130.00 909.21 -69.54 78.03 3.50 3 .49 -1.25 352.94 2030.34 58.83 130.00 1750.00 -513.71 607.37 3.50 3 .50 0.00 0.00 2175.24 58.83 130.00 1825.00 -593.40 702.35 0.00 0 .00 0.00 0.00 2251.91 61.66 128.64 1863.05 -635.56 753.84 4.00 3 .69 -1.77 -22.96 5916.10 61.66 128.64 3602.43 -2649.41 3272.83 0.00 0 .00 0.00 0.00 7476.55 85.00 189.90 4090.00 -3977.98 3720.81 4.00 1 .50 3.93 80.21 MPH-17 TO Rev 1 8098.55 85.00 189.90 4144.21 -4588.39 3614.29 0.00 0 .00 0.00 90.00 8228.82 89.99 188.38 4149.91 -4716.83 3593.62 4.00 3 .83 -1.16 -16.94 8495.49 89.99 188.38 4149.97 -4980.65 3554.74 0.00 0 .00 0.00 0.00 8696.22 90.~0 196.41 4150.00 -5176.55 3511.68 4.00 0 .01 4.00 89.90 MPH-17 T0.1 8802.87 85.73 196.39 4153.97 -5278.76 3481.59 4.00 -4 .00 -0.02 -179.66 9408.48 85.73 196.39 4199.02 -5858.16 3311.20 0.00 0 .00 0.00 0.00 9515.51 90.00 196.75 4203.00 -5960.65 3280.71 4.00 3 .99 0.34 4.86 MPH-17 T1 rev .3 9601.86 90.68 193.36 4202.49 -6044.02 3258.28 4.00 0 .79 -3.92 -78.66 10029.01 90.68 193.36 4197.43 -6459.58 3159.56 0.00 0 .00 0.00 0.00 10408.66 90.65 208.55 4193.00 -6813.05 3024.18 4.00 -0 .01 4.00 90.02 MPH-17 T2 re v .2 10457.55 92.61 208.55 4191.61 -6855.98 3000.83 4.00 4 .00 0.00 -0.05 10822.92 92.61 208.55 4175.00 -7176.59 2826.40 0.00 0 .00 0.00 0.00 MPH-17 T3 rev .2 11383.43 89.84 230.80 4162.89 -7605.11 2470.86 4.00 -0 .49 3.97 96.76 12489.85 89.84 230.80 4165.97 -8304.32 1613.38 0.00 0 .00 0.00 0.00 ~ Sperry-Sun BP Planning Report ~ Companye BP Amoco Date: 4/26l2007 Time: 12:36:46 '` Page: . 3 Field: Milne Point Co-ordinate( NE) Reference; WeIL• Plan MPH-17, True North Site: M Pt H Pad V ertica L(TVD) Reference: 35.7 + 34.3 70A We1L• PIanMPH-1 7 S ection (VS) Reference: Well (O.OON,O.OOE,1 69.13Azi ) Wel-path: Plan MPH-1 7 S urvey Calculation Method: Minimum Curvature Db: OraCle Plan Section Int'ormation MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/100ftdeg/100ftdeg/100ft deg 12510.37 90.00 230.00 4166 .00 -8317.40 1597 .58 4.00 0.78 -3.92 -78.77 MPH-17 T4 rev .2 Survey MD Inc l Azim TVD Sys TUD VS N/S E/W DLS MapN MapE TooUCo ft deg deg ft ft ft ft ft degl100ft ft ft 34. 30 0. 00 0. 00 34. 30 -35. 70 0 .00 0 .00 0. 00 0.00 6010149 .22 556649. 44 CB-GYRO 100 .00 0 .00 0. 00 100. 00 30. 00 0 .00 0 .00 0. 00 0.00 6010149 .22 556649. 44 CB-GYRO 200 .00 0 .00 0. 00 200. 00 130. 00 0 .00 0 .00 0. 00 0.00 6010149 .22 556649. 44 Start Dir 1. 300 .00 1 .50 135. 00 299. 99 229. 99 1 .08 -0 .93 0. 93 1.50 6010148 .30 556650. 37 CB-GYRO 400 .00 3 .00 135. 00 399. 91 329. 91 4 .33 -3 .70 3. 70 1.50 6010145 .55 556653. 17 Start Dir 2. 500 .00 5 .50 135. 00 499. 63 429. 63 10 .47 -8 .94 8. 94 2.50 6010140 .35 556658. 45 CB-GYRO 520 .00 6 .00 135. 00 519. 53 449. 53 12 .13 -10 .36 10. 36 2.50 6010138 .94 556659. 88 Start Dir 3. 600 .00 8 .79 132. 75 598. 85 528. 85 20 .51 -17 .46 17. 80 3.50 6010131 .89 556667. 37 CB-GYRO 700 .00 12 .28 131. 36 697. 15 627. 15 35 .07 -29 .68 31. 39 3.50 6010119 .79 556681. 06 CB-GYRO 800 .00 15 .77 130. 58 794. 16 724. 16 54 .10 -45 .55 49. 70 3.50 6010104 .06 556699. 48 C&GYRO 900 .00 19 .27 130 .08 889. 50 819. 50 77 .56 -65 .02 72 .65 3.50 6010084 .76 556722. 58 CB-GYRO 920 .92 20 .00 130 .00 909. 21 839. 21 83 .01 -69 .54 78 .03 3.50 6010080 .28 556727. 99 CB-GYRO 1000 .00 22 .77 130 .00 982. 84 912. 84 105 .38 -88 .07 100 .12 3.50 6010061 .92 556750. 22 CB-GYRO 1100 .00 26 .27 130 .00 1073. 81 1003. 81 137 .56 -114 .74 131 .90 3.50 6010035 .49 556782. 20 CB-GYRO 1200 .00 29 .77 130 .00 1162. 07 1092. 07 174 .00 -144 .93 167. 88 3.50 6010005 .58 556818. 40 MWD+IFR 1300 .00 33 .27 130 .00 1247. 31 1177. 31 214 .55 -178 .53 207 .92 3.50 6009972 .29 556858. 69 MWD+IFR 1400 .00 36 .77 130 .00 1329. 19 1259. 19 259 .05 -215 .41 251 .87 3.50 6009935 .75 556902. 92 MWD+IFR 1500 .00 40 .27 130 .00 1407. 42 1337. 42 307 .36 -255 .43 299 .57 3.50 6009896 .09 556950. 92 MWD+IFR 1600 .00 43 .77 130 .00 1481. 70 1411. 70 359 .27 -298 .45 350. 84 3.50 6009853 .47 557002. 50 MWD+IFR 1700 .00 47 .27 130 .00 1551. 76 1481. 76 414 .61 -344 .31 405 .49 3.50 6009808 .04 557057. 49 MWD+IFR 1800 .00 5~ .77 130 .00 1617. 33 1547 .33 473 .17 -392 .82 463 .31 3.50 6009759 .96 557115. 67 MWD+~FR 1900 .00 54 .27 130 .00 1678. 17 1608 .17 534 .71 -443 .82 524 .09 3.50 6009709 .43 557176. 83 MWD+IFR 2000 .00 57 .77 130 .00 1734. 06 1664 .06 599 .03 -497 .12 587 .60 3.50 6009656 .63 557240. 74 MWD+IFR 2030 .34 58 .83 130 .00 1750. 00 1680 .00 619 .05 -513 .71 607 .37 3.50 6009640 .19 557260. 64 End Dir : 2100 .00 58 .83 130 .00 1786. 06 1716 .06 665 .29 -552 .02 653 .03 0.00 6009602 .23 557306. 58 MWD+IFR 2165 .58 58 .83 130 .00 1820. 00 1750 .00 708 .82 -588 .09 696 .02 0.00 6009566 .49 557349. 84 BPRF 2175 .24 58 .83 130 .00 1825. 00 1755 .00 715 .23 -593 .40 702 .35 0.00 6009561 .23 557356. 21 Start Dir 4 / 2200 .00 59 .74 129 .55 1837. 65 1767 .65 731 .69 -607 .02 718 .71 4.00 6009547 .73 557372. 67 MWD+IFR 2251 .91 61 .66 128 .64 1863. 05 1793 .05 766 .35 -635 .56 753 .84 4.00 6009519 .46 557408. 01 End Dir : 2300 .00 61 .66 128 .64 1885. 88 1815 .88 798 .54 -662 .00 786 .90 0.00 6009493 .28 557441. 27 MWD+IFR 2400 .00 61 .66 128 .64 1933. 35 1863 .35 865 .48 -716 .96 855 .65 0.00 6009438 .85 557510 .43 MWD+IFR 2500 .00 61 .66 128 .64 1980. 82 1910 .82 932 .43 -771 .92 924 .39 0.00 6009384 .42 557579 .58 MWD+IFR 2600 .00 61 .66 128 .64 2028. 29 1958 .29 999 .37 -826 .88 993 .14 0.00 6009329 .99 557648. 74 MWD+IFR 2700 .00 61 .66 128 .64 2075. 76 2005 .76 1066 .31 -881 .84 1061 .88 0.00 6009275 .56 557717. 89 M1N~~IFR 2800 .00 61 .66 128 .64 2123. 22 2053 .22 1133 .25 -936 .80 1130 .63 0.00 6009221 .13 557787. 05 MWD+IFR 2900 .00 61 .66 128 .64 2170. 69 2100 .69 1200 .19 -991 .76 1199 .38 0.00 6009166 .70 557856 20 MWD+IFR 3000 .00 61 .66 128 .64 2218. 16 2148 .16 1267 .13 -1046 .72 1268 .12 0.00 6009112 .27 557925 .35 MWD+IFR 3100 .00 61 .66 128 .64 2265. 63 2195 .63 1334 .07 -1101 .68 1336 .87 0.00 6009057 .84 557994. 51 MWD+IFR 3200 .00 61 .66 128 .64 2313. 10 2243 .10 1401 .01 -1156 .64 1405 .61 0.00 6009003 .40 558063. 66 MWD+IFR 3300 .00 61 .66 128 .64 2360. 57 2290 .57 1467 .95 -1211 .60 1474 .36 0.00 6008948 .97 558132. 82 MWD+IFR 3400 .00 61 .66 128 .64 2408 .04 2338 .04 1534 .90 -1266 .56 1543 .11 0.00 6008894 .54 558201 .97 MWD+IFR 3500 .00 61 .66 128 .64 2455 .51 2385 .51 1601 .84 -1321 .52 1611 .85 0.00 6008840 .11 558271 .13 MWD+IFR 3600 .00 61 .66 128 .64 2502. 98 2432 .98 1668 .78 -1376 .48 1680 .60 0.00 6008785 .68 558340 .28 MWD+IFR 3700 .00 61 .66 128 .64 2550 .45 2480 .45 1735 .72 -1431 .44 1749 .34 0.00 6008731 .25 558409 .44 MWD+IFR 3789 .63 61 .66 128 .64 2593 .00 2523 .00 1795 .72 -1480 .70 1810 .96 0.00 6008682 .46 558471 .43 MPH-17 F 3800 .00 61 .66 128 .64 2597. 92 2527 .92 1802 .66 -1486 .40 1818 .09 0.00 6008676 .82 558478 .59 MWD+IFR 3900 .00 61 .66 128 .64 2645. 39 2575 .39 1869 .60 -1541 .36 1886 .84 0.00 6008622 .39 558547 .75 MWD+IFR 4000 .00 61 .66 128 .64 2692. 86 2622 .86 1936 .54 -1596 .32 1955 .58 0.00 6008567 .96 558616 .90 IVIWD+IFR ment S S S S It 1 ~ Sperry-Sun BP Planning Report ~ Company: BP Amoco Date: 4/26/2007 Time: 12:36:46 Pnge: 4 Field: Milne Point Co-ordF nate( NEJ Referenced WeIL•' Plan MPH-1T, True North Site: M Pt H Pad Vertical (TV D) Reference: 35. 7 + 34.3 70.0 Wellc Pian MPH-1 7 Section (VS) Reference: Well (O.QON,O:OOE,1 69.13Azi ) Wellpath: Plan MPH-17 Survey Calculation Method: Minimum Curvatute Db: Oracle Survey MD Incl Azim TVD Sys TVD VS N/S E/W DLS MapN M$pE Tool/Co ft deg deg ft ft ft fY ft degl1OOft ft ft 4100. 00 61. 66 128. 64 2740. 33 2670. 33 2003. 48 -1651. 28 2024. 33 0.00 6008513. 52 558686. 06 MWD+IFR 4200. 00 61. 66 128. 64 2787. 80 2717. 80 2070. 42 -1706. 24 2093. 07 0.00 6008459. 09 558755. 21 MVND+IFR 4300. 00 61. 66 128. 64 2835. 27 2765. 27 2137. 36 -1761. 20 2161. 82 0.00 6008404. 66 558824. 37 MWD+IFR 4400. 00 61. 66 128. 64 2882. 74 2812. 74 2204. 31 -1816. 16 2230. 57 0.00 6008350. 23 558893. 52 MWD+IFR 4417. 40 61. 66 128. 64 2891. 00 2821. 00 2215. 96 -1825. 73 2242. 53 0.00 6008340. 76 558905. 56 MPH-17 F 4500. 00 61. 66 128. 64 2930. 21 2860. 21 2271. 25 -1871. 12 2299. 31 0.00 6008295. 80 558962. 68 MWD+IFR 4600. 00 61. 66 128. 64 2977. 68 2907. 68 2338. 19 -1926. 08 2368. 06 0.00 6008241. 37 559031. 83 MWD+IFR 4700. 00 61. 66 128. 64 3025. 15 2955. 15 2405. 13 -1981. 04 2436. 80 0.00 6008186. 94 559100. 99 MWD+IFR 4794. 49 61. 66 128. 64 3070. 00 3000. 00 2468. 38 -2032. 97 2501. 76 0.00 6008135. 51 559166. 33 9 5/8" 4800. 00 61. 66 128. 64 3072. 62 3002. 62 2472. 07 -2036. 00 2505. 55 0.00 6008132. 51 559170. 14 MWD+IFR 4900. 00 61. 66 128. 64 3120. 09 3050. 09 2539. 01 -2090. 96 2574. 30 0.00 6008078. 08 559239. 30 MWD+IFR 5000. 00 61. 66 128. 64 3167. 56 3097. 56 2605. 95 -2145. 92 2643. 04 0.00 6008023. 64 559308. 45 MWD+IFR 5100. 00 61. 66 128. 64 3215. 03 3145. 03 2672. 89 -2200. 88 2711. 79 0.00 6007969. 21 559377. 61 MWD+IFR 5200. 00 61. 66 128. 64 3262. 50 3192. 50 2739. 83 -2255. 84 2780. 53 0.00 6007914. 78 559446. 76 MWD+IFR 5300. 00 61. 66 128. 64 3309. 96 3239. 96 2806. 77 -2310. 80 2849. 28 0.00 6007860. 35 559515. 92 MWD+IFR 5400. 00 61. 66 128. 64 3357. 43 3287. 43 2873. 72 -2365. 76 2918. 03 0.00 6007805. 92 559585. 07 MWD+IFR 5500. 00 61. 66 128. 64 34~4. 90 3334. 90 2940. 66 -2420. 72 2986. 77 0.00 6007751. 49 559654. 23 MWD+IFR 5600. 00 61. 66 128. 64 3452. 37 3382. 37 3007. 60 -2475. 68 3055. 52 0.00 6007697. 06 559723. 38 MWD+IFR 5700. 00 61. 66 128. 64 3499. 84 3429. 84 3074. 54 -2530. 64 3124. 27 0.00 6007642. 63 559792. 54 MWD+IFR 5800. 00 61. 66 128. 64 3547. 31 3477. 31 3141. 48 -2585. 60 3193. 01 0.00 6007588. 20 559861. 69 MWD+IFR 5900. 00 61. 66 128. 64 3594. 78 3524. 78 3208. 42 -2640. 56 3261. 76 0.00 6007533. 76 559930. 85 MWD+IFR 5913. 10 61. 66 128. 64 3601. 00 3531. 00 3217. 19 -2647. 76 3270. 76 0.00 6007526. 63 559939. 90 TUZC (Ug 5916. 10 61. 66 128. 64 3602. 43 3532. 43 3219. 20 -2649. 41 3272. 83 0.00 6007525. 00 559941. 98 Start Dir 4 / 6000. 00 62. 28 132. 38 3641. 86 3571. 86 3277. 05 -2697. 51 3329. 11 4.00 6007477. 33 559998. 63 MWD+IFR 6100 .00 63 .15 136. 77 3687. 72 3617 .72 3350. 23 -2759. 87 3392. 39 4.00 6007415 .46 560062. 37 MWD+IFR 6200 .00 64 .16 141. 09 3732. 11 3662 .11 3427. 66 -2827. 42 3451. 23 4.00 6007348 .37 560121. 72 MWD+IFR 6300 .00 65 .28 145. 34 3774. 83 3704 .83 3508. 98 -2899. 82 3505. 35 4.00 6007276 .39 560176. 38 MWD+IFR 6400. 00 66 .53 149. 50 3815. 67 3745 .67 3593. 77 -2976. 73 3554. 48 4.00 6007199. 86 560226. 09 MWD+IFR 6500. 00 67 .88 153. 58 3854. 42 3784 .42 3681. 63 -3057. 76 3598. 38 4.00 6007119. 17 560270. 60 MWD+IFR 6600. 00 69 .34 157. 59 3890. 90 3820. 90 3772. 13 -3142. 53 3636. 85 4.00 6007034. 71 560309. 70 MWD+IFR 6700. 00 70 .88 161. 51 3924. 94 3854 .94 3864. 83 -3230. 62 3669. 68 4.00 6006946. 88 560343. 20 MWD+IFR 6800. 00 72 .51 165. 36 3956. 35 3886. 35 3959. 28 -3321. 60 3696. 73 4.00 6006856. 11 560370. 94 MWD+IFR 6900 .00 74 .21 169. 14 3985. 00 3915 .00 4055. 02 -3415. 03 3717. 86 4.00 6006762 .86 560392. 77 MWD+IFR 7000 .00 75 .97 172. 85 4010. 74 3940 .74 4151. 58 -3510. 45 3732. 97 4.00 6006667 .56 560408. 60 MWD+IFR 7074 .74 77 .33 175 .59 4028. 00 3958 .00 4224. 00 -3582. 79 3740. 28 4.00 6006595 .29 560416. 46 MPH-17 F 7100 .00 77 .79 176. 51 4033. 44 3963 .44 4248. 49 -3607. 40 3741. 98 4.00 6006570 .69 560418. 35 MWD+IFR 7200 .00 79 .66 180. 12 4053. 00 3983 .00 4345. 27 -3705. 41 3744. 85 4.00 6006472 .72 560421. 96 MWD+IFR 7258 .81 80 .77 182. 22 4063. 00 3993 .00 4401. 94 -3763. 34 3743. 66 4.00 6006414 .79 560421. 22 SBF2-NA 7300 .00 81 .56 183. 69 4069. 33 3999 .33 4441. 47 -3803. 99 3741. 56 4.00 6006374 .13 560419. 43 MWD+IFR 7400 .00 83 .50 187. 21 4082. 33 4012 .33 4536. 60 -3902. 67 3732 .14 4.OQ 6006275 .39 560410. 76 MWD+IFR 7476 .55 85 .00 189 .90 4090. 00 4020 .00 4608. 42 -3977. 98 3720 .81 4.00 6006200 .00 560400. 00 MPH-17 T 7500 .00 85 .00 189 .90 4092. 04 4022 .04 4630. 26 -4000. 99 3716 .79 0.00 6006176 .96 560396. 16 MWD+IFR 7600 .00 85 .00 189 .90 4100. 76 4030 .76 4723. 41 -4099. 13 3699 .67 0.00 6006078 .71 560379. 78 MWD+IFR 7700 .00 85 .00 189 .90 4109. 47 4039 .47 4816. 55 -4197. 27 3682 .54 0.00 6005980 .45 560363. 41 NNVD+IFR 7800 .00 85 .00 189 .90 4118. 19 4048 .19 4909. 70 -4295. 40 3665. 42 0.00 6005882 .20 560347. 03 MWD+IFR 7843 .71 85 .00 189 .90 4122. 00 4052 .00 4950. 41 -4338. 30 3657 .93 0.00 6005839 .25 560339. 87 SBE4NC 7900 .00 85 .00 189 .90 4126. 91 4056 .91 5002. 84 -4393. 54 3648 .29 0.00 6005783 .94 560330. 65 M1ND+IFR 8000 .00 85 .00 189 .90 4135 .62 4065 .62 5095. 98 -4491. 68 3631 .17 0.00 6005685 .69 560314 .27 MWD+IFR 8004 .35 85 .00 189 .90 4136 .00 4066 .00 5100. 03 -4495. 94 3630 .42 0.00 6005681 .42 560313 .56 SBE2-NE 8098 .55 85 .00 189 .90 4144 .21 4074 .21 5187. 78 -4588. 39 3614 .29 0.00 6005588 .86 560298 .13 Start Dir 4 / 8100 .00 85 .06 189 .88 4144 .34 4074 .34 5189. 13 -4589. 81 3614 .04 4.00 6005587 .44 560297 .89 MWD+IFR 8200 .00 88 .88 188 .72 4149 .62 4079 .62 5282. 84 -4688. 34 3597 .91 4.00 6005488 .80 560282 .51 MWD+IFR ent t2 t3 ev 1 ~ Sperry-Sun BP Planning Report ~ Company: BP Amoco Date: 4/26/2007 Time: 12;36:4& Page: 5 Field: Milne Point Co-ordinate( NE) R eference: Well: Plan MPH-17, True North Site: M Pt H Pad Vertfca l (TVD) Referencec 35. 7 + 34.370A Well; Ptan MPH-17 Section (VS} Refer ence: Well (O.OON,O.OOE,1 69:13Azi ) Welipath: Plan MPH-17 Survey Calculation Method; Minimum Curvature Db: -0racle Survey MD Inc l Azim TVD Sys TVD VS N/S E/W DLS MapN MspE Tool/Co ft deg deg ft ft ft ft ft deg/100ft ft ft 8228 .82 89 .99 188. 38 4149 .91 4079 .91 5310. 02 -4716. 83 3593 .62 4.00 6005460. 27 560278. 44 End Dir : 8300 .00 89 .99 188. 38 4149 .93 4079 .93 5377. 22 -4787. 26 3583 .24 0.00 6005389. 78 560268. 60 MWD+IFR 8400 .00 89 .99 188. 38 4149 .95 4079 .95 5471. 62 -4886. 19 3568 .66 0.00 6005290. 75 560254. 77 MWD+IFR 8495 .49 89 .99 188. 38 4149 .97 4079 .97 5561. 77 -4980. 65 3554 .74 0.00 6005196. 19 560241. 57 Start Dir 4 / 8500 .00 89 .99 188. 56 4149 .98 4079 .98 5566. 03 -4985. 12 3554 .08 4.00 6005191. 72 560240. 94 MWD+IFR 8600 .00 89 .99 192. 56 4149 .99 4079 .99 5659. 09 -5083. 40 3535 .75 4.00 6005093. 31 560223. 36 MWD+IFR 8696 .22 90 .00 196. 41 4150 .00 4080 .00 5746. 02 -5176. 55 3511 .68 4.00 6005000. 00 560200. 00 MPH-17 T . 8700 .00 89 .85 196. 41 4150 .00 4080 .00 5749. 38 -5180. 17 3510 .61 4.00 6004996. 36 560198. 96 MWD+IFR 8800 .00 85 .85 196. 39 4153 .76 4083 .76 5838. 18 -5276. 02 3482 .40 4.00 6004900. 32 560171. 48 MWD+IFR 8802 .87 85 .73 196. 39 4153 .97 4083 .97 5840. 73 -5278. 76 3481 .59 4.00 6004897. 56 560170. 69 End Dir : 8896 .00 85 .73 196. 39 4160 .90 4090 .90 5923 28 -5367. 86 3455 .39 0.00 6004808. 28 560145. 17 7" 8900 .00 85 .73 196. 39 4161 .19 4091 .19 5926. 83 -5371. 69 3454 .26 0.00 6004804. 44 560144. 07 MWD+IFR 9000 .00 85 .73 196. 39 4168 .63 4098 .63 6015. 48 -5467. 36 3426 .13 0.00 6004708. 57 560116. 67 MWD+IFR 9100 .00 85 .73 196. 39 4176 .07 4106 .07 6104. 12 -5563. 03 3397 .99 0.00 6004612. 70 560089. 26 MWD+IFR 9200 .00 85 .73 196. 39 4183 .51 4113 .51 6192. 77 -5658. 70 3369 .86 0.00 6004516. 82 560061. 86 MWD+IFR 9260 .37 85 .73 196. 39 4188 .00 4118 .00 6246. 29 -5716. 46 3352 .87 0.00 6004458. 95 560045. 31 TSBD-Top 9300 .00 85 .73 196. 39 4190 .95 4120 .95 6281. 42 -5754. 37 3341 .72 0.00 6004420. 95 560034. 45 MWD+IFR 9400 .00 85 .73 196. 39 4198 .39 4128 .39 6370. 06 -5850. 05 3313 .59 0.00 6004325. 08 560007. 05 MWD+IFR 9408 .48 85 .73 196. 39 4199 .02 4129 .02 6377. 58 -5858. 16 3311 .20 0.00 6004316. 95 560004. 72 Start Dir 4 / 9500 .00 89 .38 196. 70 4202 .92 4132 .92 6458. 74 -5945. 80 3285 .17 4.00 6004229. 12 559979. 36 MWD+IFR 9515 .51 90 .00 196. 75 4203 .00 4133 .00 6472. 48 -5960. 65 3280 .71 4.00 6004214. 24 559975. 01 MPH-17 T 9600 .00 90 .66 193. 44 4202 .51 4132 .51 6548. 43 -6042. 21 3258 .71 4.00 6004132. 52 559953. 64 MWD+IFR 9601 .86 90 .68 193. 36 4202 .49 4132 .49 6550. 13 -6044. 02 3258 .28 4.00 6004130. 71 559953. 22 End Dir : 9700 .00 90 .68 193. 36 4201 .33 4131 .33 6639. 61 -6139. 50 3235 .60 0.00 6004035. 07 559931. 27 MWD+IFR 9800 .00 90 .68 193. 36 4200 .14 4130 .14 6730. 79 -6236. 78 3212 .49 0.00 6003937. 62 559908. 90 MWD+IFR 9900 .00 90 .68 193. 36 4198 .96 4128 .96 6821. 97 -6334. 07 3189 .38 0.00 6003840. 17 559886. 53 MWD+IFR 10000 .00 90 .68 193. 36 4197 .77 4127 .77 6913. 15 -6431. 35 3166 .27 0.00 6003742. 72 559864. 16 MWD+IFR 10029 .01 90 .68 193. 36 4197 .43 4127 .43 6939. 60 -6459. 58 3159 .56 0.00 6003714. 45 559857. 67 Start Dir 4 / 10100 .00 90 .68 196. 20 4196 .59 4126 .59 7003. 58 -6528. 20 3141 .45 4.00 6003645. 70 559840. 09 MWD+IFR 10200 .00 90 .67 200. 20 4195 .41 4125 .41 7090. 95 -6623. 17 3110 .22 4.00 6003550. 50 559809. 58 MWD+IFR 10300 .00 90 .66 204. 20 4194 .25 4124 .25 7174. 73 -6715. 73 3072 .44 4.00 6003457. 67 559772. 51 MWD+IFR 10400 .00 9~ .65 208. 20 4193 .10 4123 .10 7254. 49 -6805. 43 3028 .30 4.00 6003367. 64 559729. 05 MWD+IFR 10408 .66 90 .65 208. 55 4193 .00 4123 .00 7261. 19 -6813. 05 3024 .18 4.00 6003360. 00 559725. 00 MPH-17 T 10457 .55 92 .61 208. 55 4191 .61 4121 .61 7298. 94 -6855. 98 3000 .83 4.00 6003316. 90 559701. 97 End Dir : 10500 .00 92 .61 208. 55 4189 .68 4119 .68 7331. 70 -6893. 23 2980 .56 0.00 6003279. 50 559681. 99 MWD+IFR 10600 .00 92 .61 208. 55 4185 .13 4115 .13 7408. 87 -6980. 98 2932 .82 0.00 6003191. 39 559634. 92 MWD+IFR 10700 .00 92 .61 208. 55 4180 .59 4110 .59 7486. 04 -7068. 73 2885 .08 0.00 6003103. 29 559587. 85 MWD+IFR 10800 .00 92 .61 208. 55 4176 .04 4106 .04 7563. 21 -7156. 48 2837 .34 0.00 6003015. 19 559540. 78 MWD+IFR 10822 .92 92 .61 208. 55 4175 .00 4105 .00 7580. 90 -7176. 59 2826 .40 0.00 6002995. 00 559530. 00 MPH-17 T 10900 .00 92 .24 211. 61 4171 .74 4101 .74 7639. 05 -7243. 22 2787 .80 4.00 6002928. 08 559491. 91 MWD+IFR 11000 .00 91 .76 215. 59 4168 .25 4098 .25 7710. 36 -7326. 45 2732 .51 4.00 6002844. 45 559437. 26 MWD+IFR 11100 .00 91 .26 219. 56 4165 .62 4095 .62 7776. 65 -7405. 66 2671 .57 4.00 6002764. 78 559376. 93 MWD+IFR 11200 .00 90 .76 223. 53 4163 .85 4093 .85 7837. 63 -7480. 48 2605 .27 4.00 6002689. 46 559311. 21 MWD+IFR 11300 .00 90 .26 227. 49 4162 .96 4092 .96 7892. 98 -7550. 55 2533 .95 4.00 6002618. 87 559240. 43 MWD+IFR 11383 .43 89 .84 230. 80 4162 .89 4092 .89 7934. 66 -7605. 11 2470 .86 4.00 6002563. 83 559177. 75 End Dir : 1 1 11400 .00 89 .84 230. 80 4162 .93 4092 .93 7942. 52 -7615. 58 2458 .01 0.00 6002553. 26 559164. 99 MWD+fFR 11500 .00 89 .84 230. 80 4163 .21 4093 .21 7989. 96 -7678. 78 2380 .51 0.00 6002489. 49 559087. 98 MWD+IFR 11600 .00 89 .84 230. 80 4163 .49 4093 .49 8037. 41 -7741. 97 2303 .01 0.00 6002425. 71 559010. 97 MWD+IFR 11700 .00 89 .84 230. 80 4163 .77 4093 .77 8084. 85 -7805. 17 2225 .52 0.00 6002361. 93 558933. 96 MWD+IFR 11800 .00 89 .84 230. 80 4164 .05 4094 .05 8132. 29 -7868. 36 2148 .02 0.00 6002298. 16 558856. 95 MWD+IFR 11900 .00 89 .84 230. 80 4164 .33 4094 .33 8179. 74 -7931. 56 2070 .52 0.00 6002234. 38 558779. 94 MWD+IFR 12000 .00 89 .84 230. 80 4164 .61 4094 .61 8227. 18 -7994. 76 1993 .02 0.00 6002170. 60 558702. 93 MWD+IFR 12100 .00 89 .84 230. 80 4164 .88 4094 .88 8274. 62 -8057. 95 1915 .52 0.00 6002106. 83 558625. 93 MWD+IFR ent 8 0 2 ev . 1 ev . 5 ev . 8 ~ Sperry-Sun BP Planning Report ~ Company: BP Amoco Date: 4/26/2007 Time: 12:36:46 P~ge: 6 Field: Mi1ne Point Co-ordinate(NE)Beference: Well: Plan MPH-17, True North Site: M Pt H Pad Vertical (TVD) Reference: 35.7 + 34.3 70A We1L• Plan MPH-17 Section (VS) Referencec Well (O.UON,O:OOE,7 69.13Azi) Welipath: Plan`MPH-17 Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim T'VD Sys TVD VS N/S E/W DLS MapN MapE Tool/Co ft deg deg ft ft ft ft ft deg/1OOft ft ft 12200.00 89.84 230.80 4165.16 4095.16 8322.06 -8121.15 1838.02 0.00 6002043.05 558548.92 MWD+IFR ' 12300.00 89.84 230.80 4165.44 4095.44 8369.51 -8184.34 1760.52 0.00 6001979.27 558471.91 MWD+IFR ' 12400.00 89.84 230.80 4165.72 4095.72 8416.95 -8247.54 1683.02 0.00 6001915.50 558394.90 MWD+IFR ' 12489.85 89.84 230.80 4165.97 4095.97 8459.58 -8304.32 1613.38 0.00 6001858.19 558325.70 Start Dir 4/ 12500.00 89.92 230.41 4165.99 4095.99 8464.42 -8310.76 1605.54 4.00 6001851.69 558317.91 MWD+IFR ' 12510.30 90.00 230.00 4166.00 4096.00 8469.41 -8317.36 1597.63 4.00 6001845.04 558310.05 Totai Dept 12510.37 90.00 230.00 4166.00 4096.00 8469.44 -8317.40 1597.58 4.00 6001845.00 558310.00 MPH-17 T~ nent :v . i ~i _ ~ _ ~ ~ ~ E ;Y ~ x ° ~ - ~ ~ Y aJ ~ ~i ., - oy'C 1. P~~" ~ ~ n S.r, n =t ~ -~~ -A a ~ s a s s i .: .,- ~ ~a s + ~a-~ x ~~ +~+~+~~y ~ ~ ~.~-~ ~~3 ~ oo~ca~~;~e, ~ _ ~~~~s ? ~ ~ '~ ~~d~~~~~ ~~'~~'~~~~~~~Z88~o~xx~. eZ~~~~~~~o~a~~~~~^$s - ~''~b..~N~~~ghx~~~~<~ ~ __ ` ~ " a~ o ~ ~~s3~~s~ ~ ~ ~~ ~ '~3~~~.~~~ _ 3 ~ ~ _ . ;~3 a'~a« « ca a ~ x~ 4 88$5~~3~3~~3~8~~8~~s8"~8~a~ ~ T~~ r~..~- x~~ ~~' r° x~= __ '~~_~°, + o ~~~~~=Y33?=""'_3""~"'_'___"'a.......~~...-F ' :I° °F~ °~ ~ ~ -- ~.. ~. --=-_ --~~_ds=°===is_s~=s=====~ ss~~ss_fs~s"_=- 3} - `=-=«~=?~~~===========`-_~=_==a~~<~~« « «:.~=; ; ~ aa~a~~sasa~saeeo<~assas=s r ~~ .~`T ~ - __. ~._....,., -.r~~=~~~ ~ . £~~ c ~ . . _e > ' ~ ~~ ' ~SS~ ~ ~9.' 7~~ ~~'..' '~~' ~~"i.~..f . FFF~ ~ .. . . . t~ " - > ~'a'~ SS ~S"ES_5••. "~si~n~ ~i ~~~i -.~ i~ ~ i^<i'«s~s«: ss.«s<`sss~`s~z~:.~<siE~`«<'<~~ ..< '< a 3 3?~ . ~~ ~?~ h a ~.~~ ~ ~ ~~~~~~~ ~~~~~~~~~~ ~~ ~ ~~) ~~~~ ~~~~~~~ ~;_~ ^~° ___'_~""" ~'~`~"~ - " oa~..~~ax,a;ara~~=_~~~~?~.~_:~~ '9 ='~ ~ ~ Z -Yv~~~'in~=-.-i ~`-':.~3'=V"^?- ~ ~n O '^Y~~~.TTSv.,'.~'.n:;~4~%nn<i a ~ t.., „ Q C. ~" :~S~h.~$3~5:3.~= a8~"3.a'63a.=<5's F ~_ ~ o0000000000 'B ce W ~ ~~ axx"•-ssas„~ -'2~ ,~ o0000000000000 ~ ''~ s~___~a`*eee~vea~'-ve==e~ ~_ o~nov,o~nov,ov,p ~nov,p a ~ < ~~ F N V1 1~ .~. N N r+t r+1 [t ~ Vl vt ~O Q ~~7 v, ~ I '. I I ~ f-~ ~ 3s3,~3$3$$xia~°''° _~',_ax~~.~=~ ~ ~ ~ I a~i°'"~ ~_ x~~ v C~ ~ ~ ~ sa ~~ ~~,~~~~ = t o y ~ F~~~a« xx~~x~~_~_:.r~~ ~vooooo00000000 ~ Q VJ ~ c ss8_,s°=_~•."-"^~-°_~.va,~..~, ~v,ov,ooooo00000 ,~ ~ ~~~^~~~~_~;,~ ~ ~ r~~nrov,ov,ov~ov,ov, ~,.,~.r~ <,.<x ^~- __- - ~ ~ Ly ~NNMMV7V1Vl a¢a ~~'~° °'~ ~~ =3°---- ~ ~<~~~ ~ a. a~i c : _.,_.,~_~<>__-------_:,.,...,~.., i. ~ ~3=~~ ~ c~a '~ a ~e9u~ L~r s ~!~3s ~:s . c ~5~5~ ~ ~ ~ 3 0 - i ~ _ c ~ o 0 o , - - ,r, ~ c~ ~ a _ ~ 3 ~n ~ ~ s =~ ~ a~ N ^1 ~ ~ 3 ~ -'~ O v Y ~ ~ ~ o ~' ` N s~~ - , ~ ~ U o -~ u ~~~ > ~ i ~ o.. . •' ss~' i o a°~i ~4.. `-i~_ ~ }_ __ . °0 u a ~' _._ ~ ,~ A~~ ~ ~ ~ ,~.,;\ ;A~~~\o`'J N , ~. ~ ¢ ~ .~-.._._. ~ . ~ ~~~~ r `~ ~~. ~ ~_t ~; ~ s ~~~.~~~;; + 5 ~~ ~ - O i ~ i j , F" \ ~6 - ~ .(~ \;y " ~f ~ ys.~ _ ~ ~ -~r--~" ' 9 ~~ ~ S" ~ : 3 v I / ; ~', , - ~'~_ .. . •N ~ 3 ~` V. ~ I ~ `'~~: ~ Q ~ - ~ - ~, ~ ~~ - -- ~_~'~~' ~~~~ .~ -(~c1li_ ~ ~ \ C ~ - M ~ ~ N V _ _ \ ~ ` ` ~ ~ ~ '' _ x `` ` ~ 1 "~4i a~ ~ ~~ ( ~ ~~ = ~ ~ j ~ ..:. ` '- - _ ea n ` I ~ ~ ~~ 3 ~ ~ 1 ~ ? ' ~ , J(.-a„~," ,. 3 3 ° ~u ` ~ >~_.~ '!~'1TlY`~. t~ ~ ~.~ ~,,~~,,~..1~~~y.~ - ~~ ~ N ~ ~~ N O v~ O ~n 0 ~n O ~n O N ~~ ~ ~ ~ ~ ~ ~ r ~ ~ ~ r s ~ ~ ~ ~ ~ Sperry-Sun Anticollision Report ~ Company: BP Amoco Date: 4/25/2007 Time: 13:05:48 Page: 1 Field: Milne Point Reference Site: M Pt H Pad Co-ordinate(PTE) Re ference: WeIL• Plan MPH-17, True North Reference Well: Plan MPH-17 Vertical (T VD) Refe rence: 35.7 + 34.3 70.~ Reference WellpatlPlan MPH-17 Db: Oracle : GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference Reference: Principal Plan & PLANNED PROGRAM Interpolation Meth odMlD IntervaL• 25.00 ft Erro r ModeL• ISCWSA Ellipse Depth Range: 34.3~ to 12510.37 ft Scan Method: Trav Cylinder North Maximum Radius:l 447.61 ft Error Surface : Ellipse + Casing Survey Program for Definitive Wellpath Date: 6/20/2006 Validated: No Version: 4 Planned From To Survey Toolcode Tool N ame ft ft 34.30 1200.00 Planned: MPH-17 wp10 V51 CB-GYRO-SS Camera based gyro single shots 1200.00 12510.37 Pianned: MPH-17 wp10 V51 MWD+IFR+ MS MWD + IFR + Multi Station Casing Points MD TVD Diameter Hole Size Name ft ft in in 4794.49 3070.00 9.625 12.250 9 5/8" 8691.49 4150.00 7.000 8.500 7" 12510.37 4166.00 4.500 6.750 41/2" Summary <---------------------- Offset Wellpath ----------------------> Reference Offset Ctr-Ctr No-Go Allowsble Site Well Wellpath MD MD Distanc eArea Deviation Warning fit ft ft ft ft M Pt H Pad MPH-01 MPH-01 V1 1316.03 1275.00 267.64 37.95 229.69 Pass: Major Risk M Pt H Pad MPH-02 MPH-02 V1 1575.00 1575.00 76.25 45.00 31.25 Pass: Major Risk M Pt H Pad MPH-03 MPH-03 V1 1037.74 1050.00 103.99 26.39 77.60 Pass: Major Risk M Pt H Pad MPH-04 MPH-04 V1 712.61 700.00 81.12 13.44 67.68 Pass: Major Risk M Pt H Pad MPH-05 MPH-05 V1 784.40 775.00 106.39 14.90 91.48 Pass: Major Risk M Pt H Pad MPH-06 MPH-06 V1 837.34 825.00 161.70 15.70 146.01 Pass: Major Risk M Pt H Pad MPH-07 MPH-07 V1 899.66 875.00 283.84 16.63 267.21 Pass: Major Risk M Pt H Pad MPH-07 MPH-07A V12 894.84 875.00 283.71 16.49 267.22 Pass: Major Risk M Pt H Pad MPH-07 MPH-07AL1 V5 894.84 875.00 283.71 16.28 267.44 Pass: Major Risk M Pt H Pad MPH-07 MPH-07AL1 P61 V4 894.84 875.00 283.71 16.49 267.22 Pass: Major Risk M Pt H Pad MPH-07 MPH-07AL1 PB2 V6 894.84 875.00 283.71 16.49 267.22 Pass: Major Risk M Pt H Pad MPH-07 MPH-07APB1 V25 894.84 875.00 283.71 18.38 267.33 Pass: Major Risk M Pt H Pad MPH-08 MPH-08 V3 3918.25 4050.00 151.88 130.12 21.77 Pass: Major Risk M Pt H Pad MPH-08 MPH-OSA V4 3918.25 4050.00 151.88 130.40 21.48 Pass: Major Risk M Pt H Pad MPH-08 MPH-08AP61 V3 3918.25 4050.00 151.88 130.40 21.48 Pass: Major Risk M Pt H Pad MPH-08 MPH-08B V5 3918.25 4050.00 151.88 130.41 21.47 Pass: Major Risk M Pt H Pad MPH-08 MPH-08BL1 V16 3918.25 4050.00 151.88 130.41 21.47 Pass: Major Risk M Pt H Pad MPH-08 MPH-086PB1 V1 3918.25 4050.00 151.88 130.41 21.47 Pass: Major Risk M Pt H Pad MPH-10 MPH-10 V9 537.30 525.00 236.85 9.33 227.52 Pass: Major Risk M Pt H Pad MPH-11 MPH-11 V6 536.59 575.00 213.46 9.17 204.29 Pass: Major Risk M Pt H Pad MPH-12 MPH-12 V2 891.29 900.00 182.13 18.36 163.77 Pass: Major Risk M Pt H Pad MPH-13 MPH-13 V4 922.91 950.00 151.22 17.52 133.70 Pass: Major Risk M Pt H Pad MPH-13 MPH-13A V4 917.79 950.00 151.12 17.31 133.82 Pass: Major Risk M Pt H Pad MPH-14 MPH-14 V7 695.73 700.00 141.56 12.95 128.61 Pass: Major Risk M Pt H Pad MPH-15 MPH-15 V6 551.18 550.00 54.21 11.31 42.89 Pass: Major Risk M Pt H Pad MPH-16 MPH-16 V5 624.24 625.00 25.79 12.46 13.33 Pass: Major Risk M Pt H Pad MPH-16 MPH-16L1 V4 624.24 625.00 25.79 12.20 13.59 Pass: Major Risk M Pt H Pad MPH-16 MPH-16PB1 V2 624.24 625.00 25.79 13.26 12.53 Pass: Major Risk M Pt H Pad MPH-16 MPH-16PB2 V2 624.24 625.00 25.79 13.26 12.53 Pass: Major Risk M Pt H Pad MPH-16 MPH-16P63 V2 624.24 625.00 25.79 13.26 12.53 Pass: Major Risk M Pt H Pad MPH-18 MPH-18 V6 324.93 325.00 30.29 6.59 23.69 Pass: Major Risk M Pt H Pad MPH-18 MPH-18L1 V3 324.93 325.00 30.29 6.33 23.95 Pass: Major Risk M Pt H Pad MPH-18 MPH-18L2 V2 324.93 325.00 30.29 6.33 23.95 Pass: Major Risk M Pt H Pad MPH-Diomed Plan MPH-Diomed P61 V2 371.01 375.00 145.89 8.68 137.21 Pass: Major Risk M Pt H Pad MPH-Diomed Pfan MPH-Diomed V2 Pla 371.01 375.00 145.89 8.62 137.27 Pass: Major Risk M Pt S Pad MPS-21 MPS-21 V17 10308.06 8925.00 183.52 114.98 68.54 Pass: Major Risk M Pt S Pad MPS-27 MPS-27 V9 11115.56 8600.00 867.17 134.10 733.06 Pass: Major Risk M Pt S Pad MPS-27 MPS-27L1 V7 11164.77 8675.00 875.41 131.23 744.18 Pass: Major Risk M Pt S Pad MPS32 MPS-32 V5 11264.73 8425.00 1068.15 142.84 925.31 Pass: Major Risk M Pt S Pad MPS-34 MPS-34 V9 11091.47 8600.00 496.69 108.90 387.79 Pass: Major Risk M Pt S Pad MPS-34 MPS-34L1 V1 11091.47 8600.00 496.69 108.64 388.05 Pass: Major Risk M Pt S Pad MPS-34 MPS-34L2 V9 11091.47 8600.00 496.69 108.74 387.95 Pass: Major Risk ~ Sperry-Sun Anticollision Report \J Company: BP Amoco Date: 4/25/2007 Tlme: 13:b5:48 Page: 2 Field: Milne Poi~ Reference Site: M PCH Pad Co-ordinate(NE) Reference: Well: Plan MPH=17, True North Reference WeIL• Plan MPH-17 Vertical (TVD) Reference: 35:7 + 34. 3 70A Reference WellpatlPJan MPH-17 Db: -0rac4e Summary <--------- ----------- Offset Wellpath ----------------------> Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpath MD MD DistanceArea beviation Warning ft ft ft ft ft M Pt S Pad MPS-35 MPS-35 V17 6643.80 14650.00 241.39 181.13 60.26 Pass: Major Risk M Pt S Pad MPS35 MPS-35P61 V16 1 1447.15 8675.00 549.44 115.98 433.46 Pass: Major Risk M Pt S Pad MPS-35 MPS-35P62 V16 1 1447.15 8675.00 549.44 115.96 433.49 Pass: Major Risk M Pt S Pad Plan MPS - 00 Plan MPS-00 V2 Plan: M 1 1474.80 10366.64 217.16 145.62 71.54 Pass: Major Risk M Pt S Pad Plan MPS-41 Mary Jean VO Plan : Mar 1 0630.62 8650.00 476.85 110.71 366.14 Pass: Major Risk Site: M Pt H Pad Well: MPH-01 Rule As signed: Major Risk Wellpath: MPH-01 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr Na-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casingl HBistanceArea Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 48.00 48.00 50.00 50.00 0.03 0.01 196.14 196.14 270.64 1.17 269.47 Pass 73.00 73.00 75.00 75.00 0.09 0.02 196.14 196.14 270.65 1.63 269.01 Pass 98.00 98.00 100.00 100.00 0.15 0.04 196.13 196.13 270.66 2.10 268.57 Pass 123.00 123.00 125.00 125.00 0.23 0.05 196.13 196.13 270.69 2.64 268.05 Pass 148.00 148.00 150.00 150.00 0.32 0.06 196.13 196.13 270.72 3.20 267.53 Pass 173.00 173.00 175.40 175.00 0.40 0.08 196.13 196.13 270.77 3.75 267.02 Pass 198.00 198.00 200.00 200.00 0.49 0.09 196.12 196.12 270.82 4.30 266.52 Pass 223.82 223.82 225.00 225.00 0.51 0.11 196.13 61.13 270.84 4.65 266.19 Pass 249.70 249.70 250.00 250.00 0.52 0.12 196.17 61.17 270.79 4.98 265.81 Pass 275.58 275.58 275.00 275.00 0.53 0.14 196.24 61.24 270.67 5.31 265.36 Pass 301.46 301.45 300.00 300.00 0.54 0.16 196.33 61.33 270.49 5.68 264.81 Pass 327.33 327.30 325.00 325.00 0.58 0.19 196.44 61.44 270.27 6.13 264.14 Pass 353.19 353.15 350.00 350.00 0.62 0.21 196.57 61.57 270.00 6.58 263.42 Pass 379.05 378.98 375.00 374.99 0.65 0.24 196.71 61.71 269.69 7.03 262.66 Pass 405.01 404.92 400.00 399.99 0.69 0.27 196.86 61.86 269.33 7.49 261.85 Pass 431.46 431.31 425.00 424.98 0.74 0.29 197.04 62.04 268.92 7.96 260.96 Pass 457.89 457.67 450.00 449.97 0.78 0.32 197.22 62.22 268.52 8.43 260.09 Pass 484.31 484.00 475.00 474.94 0.82 0.35 197.39 62.39 268.14 8.90 259.24 Pass 510.72 510.30 500.00 499.89 0.86 0.38 197.55 62.55 267.79 9.35 258.44 Pass 537.18 536.61 525.00 524.82 0.90 0.41 197.70 63.35 267.46 9.81 257.65 Pass 563.66 562.88 550.00 549.72 0.94 0.45 197.87 64.30 267.14 10.32 256.82 Pass 590.12 589.08 575.00 574.58 0.99 0.49 198.03 65.09 266.83 10.84 256.00 Pass 616.56 615.21 600.00 599.40 1.05 0.53 198.20 65.76 266.54 11.39 255.14 Pass 642.99 641.25 625.00 624.17 1.12 0.58 198.37 66.34 266.25 11.97 254.28 Pass 669.41 667.20 650.00 648.88 1.19 0.62 198.55 66.85 265.98 12.56 253.42 Pass 695.80 693.05 675.00 673.55 1.26 0.68 198.75 67.35 265.68 13.18 252.50 Pass 722.15 718.77 700.00 698.2~ 1.35 0.74 199.03 67.87 265.31 13.86 251.A5 Pass 748.47 744.35 725.00 722.84 1.44 0.80 199.36 68.43 264.89 14.56 250.33 Pass 774.72 769.78 750.00 747.46 1.54 0.86 199.77 69.02 264.41 15.25 249.15 Pass 800.92 795.04 775.00 772.06 1.63 0.93 200.23 69.65 263.88 15.97 247.91 Pass 827.06 820.14 800.00 796.61 1.75 1.01 200.74 70.31 263.38 16.80 246.57 Pass 853.15 845.06 825.00 821.12 1.88 1.09 201.28 70.98 262.91 17.64 245.26 Pass 879.18 869.81 850.00 845.56 2.00 1.17 201.84 71.67 262.48 18.48 243.99 Pass 905.15 894.36 875.00 869.95 2.12 1.25 202.44 72.38 262.10 19.33 242.76 Pass 931.12 918.78 900.00 894.27 2.26 1.33 203.08 73.08 261.77 20.23 241.53 Pass 957.12 943.08 925.00 918.53 2.42 1.41 203.74 73.74 261.48 21.20 240.28 Pass 983.06 967.18 950.00 942.69 2.58 1.51 204.42 74.42 261.31 22.23 239.09 Pass 1008.95 991.08 975.00 966.75 2.75 1.61 205.11 75.11 261.33 23.30 238.03 Pass 1034.79 1014.77 1000.00 990.68 2.94 1.72 205.80 75.80 261.52 24.44 237.08 Pass 1060.57 1038.24 1025.00 1014.49 3.14 1.83 206.49 76.49 261.90 25.62 236.28 Pass 1086.31 1061.50 1050.00 1038.16 3.33 1.95 207.17 77.17 262.33 26.84 235.49 Pass 1112.00 1084.55 1075.00 1061.71 3.55 2.08 207.85 77.85 262.78 28.13 234.65 Pass ~ MPH-17 Area of Review ('/4 Mile): i Eight wells penetrate the Schrader Bluff NB/NE/OA/OB sands within a 1/4-mile of the MPH-17 NB/NE/OA/OB injection intervals, and based upon this review, it is our conclusion that the off-set wells have sufficient mechanical integrity to be within the proposed injection patter of this well. I. Cementing Data - No unusual issues were note in the well to well review of the associated cement jobs. II. Injector Well Data - There is only one Schrader Bluff injection well within this AOR. The well has been squeezed. A diagram showing the locations of these wellbores is included in this packet. The following table(s) provides information on the production/injection casing cement jobs and FIT's (if available) for each proximate well. Cementing Data for Schrader Zones: Well Type S ie Shoe Depth Cement ~p/gal MDND EMW MPH-02 producer „ 7 6204 / 4428 396 sks Class "G" TOC estimated at 4500' MD / ' 3220 VD MPH-05 Kuparuk „ ~ 1 41 08 / 6983 1 st Stage Kuparuk - 236 sks Class "G"; 2nd stage Producer ~ 7100' MD Schrader Bluff - 198 sks Class "G" Schrader Bluff 1 S Stage 550 sks Class "E" & 650 Kuparuk 9-5/8" 7304 / 4374 sks Class "G" 2"d Stage 600 sks of Class "E" & 50 14.3 MPH-06 ~njector sks of Class "E" 7" 1 4838 / 6883 Ku aruk - 71.7 BBLS Class "G" - 15 Stage -1138 sks Class "L" & 328 sks Class "G". MPS-21 Injector 7" 9444 / 441 g 2~a Stage (Tam Collar C~3 987') 204 sks Class "L" & ' " " _ . Top job (tagged TOC at 124 108 SKS of Class C w/ 1" 969 sks of Class "L". Primary 1360 sks Class "L" & 650 sks Class "G" MPS-27 producer 7" 8302 / 4103 TOC at 788' Top Job (tagged TOC at 870' w/ 1") " " 11.0 & Li (OA and OB laterals have slotted 427 sks Class L liners MPS-32 producer 7 5/8" 7543 / 3900 425 sks Class "G" NB lateral has screened liner 11.0 MPS-34 producer 7-5/8" 11159 / 4322 725 sks Class "G" (NE and OA laterals have slotted i 1.0 L1 &L2 liners) MPS-35 producer 7 5/8" 10751 / 4330 750 sks of Class "G" NB lateral has screened liner 11.5 ~ Area of Review Offset Wells Formation Tops MPH-06 Hole Size ~p Shoe Depth MD Length 24" 20" 112 80' 12-1/4" 9-5/8" 7304' 7270' 8-1/2" 7" 14838' 14803' Formation To s MD TVD To NA Sand 6002 3951 To NB Sand 6085 3981 To NC Sand 6180 4017 To NE Sand 6375 4085 To OA Sand 6691 4183 To OB Sand 6937 4256 Base OB Sand 7015 4282 MPH-02 Hole Size Op Shoe Depth MD Length 30" 13-3/8" 115' 80' 12-1/4" 9-5/8" 3108' 3073' 8-1/2" 7" 6204' 6170' Formation To s MD TVD To NA Sand 5606 3958 To NB Sand 5640 3986 To NC Sand 5676 4016 To ND Sand 5690 4026 To NE Sand 5696 4032 To OA Sand 5797 4113 To OB Sand 5873 4175 Base OB Sand 5906 4202 ~ MPH-05 Hole Size ~p Shoe Depth MD) Length 24" 20" 112' 80' 12.25" 9-5/8" 5335' 5306' 8.5" 7" 14108' 14079' Formation To s MD TVD To NA Sand 6121 3977 To NB Sand 6229 4013 To NC Sand 6330 4048 To NE Sand 6380 4067 To OA Sand 6674 4178 To OB Sand 6847 4245 Base OB Sand 6924 4274 MPS-35 Shoe Hole Size ~p Depth Length MD 42" 20" 110' 75' 13-1/2" 10-3/4" 5816' 5782' 9-7/8" 7-5/8" 10751' 10719' 6-1/8" 4" 14804' 4154' Formation To s MD TVD To NA Sand 10286 4031 To NB Sand 10700 4083 ~ MPS-34 L1 (slotted liner) Hole Size ~p Shoe Depth (MD) Length 42" 20" 110' 75' 13-1/2" 10-3/4" 5518' 5484' 9-7/8" 7-5/8" 11159' 1112$' 6-1/8" 4-1/2" 13232' 2959' Formation To s MD TVD To NA Sand 9846 4038 To NB Sand 9943 4064 To NC Sand 10078 4097 To NE Sand 10160 4115 To OA Sand 10367 4221 M PS-21 Shoe Hole Size ~p Depth Length M D) 42" 20" 111' 78' N/A 9-7/8" 7" 9444' 9411' Formation To s MD TVD To NA Sand 8877 4038 To NB Sand 8925 4064 To NC Sand 8981 4096 To ND Sand 8997 4104 To NE Sand 9006 4110 To OA Sand 9131 4189 To OB Sand 9214 4247 Base OB Sand 9257 4266 MPS-27 (slotted linerl Hole Size Op Shoe Depth M D) Length 42" 20" 112' 84' N/A 9-7/8" 7" 8302' $274' 6-1/8" 4-1/2' 11155' 2990' Formation To s MD TVD To NA Sand 7505 3917 To NB Sand 7567 3939 To NC Sand 7646 3965 To ND Sand 7676 3974 To NE Sand 7688 3978 To OA Sand 7946 4050 To OB Sand 8236 4095 Base OB Sand 9361 4105 ~ MPS-34 L2 (slotted liner) Hole Size ~p Shoe Depth MD Length 42" 20" 110' 75' 13-1/2" 10-3/4" 5518' 5484' ' 9-7/8" 7-5/8" 11159' 11128' , 6-1l8" 4-1/2" 13091' 2954' I Formation To s MD TVD To NA Sand 9846 4038 To NB Sand 9943 4064 To NC Sand 10078 4097 To NE Sand 10160 4115 MP5-32 (screened liner Hole Size Op JI IVC Depth MD Length 42" 20" 110' 75' 13-1/2" 10-3/4" 3173' 3138' 9-7/8" 7-5/8" 7543' 7508' Formation To s MD TVD To NA Sand 7622 3923 To NB Sand 7720 3945 MPS-27 L1 (slotted liner) Hole Size ~p Shoe Depth MD Length 42" 20" 112' 84' N/A 9-7J8" 7" 8302' 8274` 6-1/8" 4-1/2' 11009' 3073' Formation To s MD TVD To NA Sand 7505 3917 To NB Sand 7567 3939 To NC Sand 7646 3965 To NE Sand 7688 3978 To OA Sand 7946 4050 • ~ MPS-21 Injector MPS-21 was completed as an NB/NE/OA Injector in August 2002. The perforations were cement squeezed in 2004 to improve bonding. While cleaning out cement with coil tubing, under reamer parts were left in the hole. The cement was cleaned out to 8954' MD (14' below the top of the NB perforation). Trse:Camoron 4-1N6°. 5M ~: FMC 11' gen B 4.5 hanger w/ 4.a' TC-il TSB CIW 4' FI-profpe I ZO'x 34" insWated. 215 ?YfR A~3 s0" KOP ~ 300' Ma~c. hole angle = 70 - 77 deg F/ 2800. _ 8,500. Hole angle thru perts = 50 deg. 7" 26#, L-80, BTRC Cas~ng {dnft ID = 6.151, cap.= .0383 bpf) 3.5", 9.2 ppf, L-80 IBT !wt Tbg. (cap. = 0.0087 bpf, drift = 2_S6T) 3.5" HES X-Nippie { 2.813" ) 2?=~" ~ 3.5" HES X-Nipp~ ( 2.813" 1 s.e3a' ' I~I P U S' ~2'' ~ Orig. DF Elev. = 73.25' Orig. GL Elov. = 39.00' Pertoration Summarv v~ N:0 25C5 Fo~ePH N/6% : spr. ec aeq ~s~ teo pn~ng u: Flso 25G; Fb+Y~jec MI,!x. s spr. se prasng rrsna i 2.5' 2 @930' - 4098' - 4D68' 2.5' 8 90?9' 4t09'-4121' oards 25" 4 J 4~' - 9180' 4195" - 42D9' ~ P~ °" 6 8.G35' - E.240' 3 3W8' HSD 4 spf. Random phasirtg, 248 HJ 14 RD 7° x 3.5" Baker "S-3" Pertn. pack~ e.ss~ ~ 3.5" HE5 XN-Nipple 2.813' Pky. 8,891' - (No-Go 275' id } 6fl3' ~ • 3.5 WLEG ELMD 3g01' X x}C }C All perfs spueeze vrth ument TOC is r.ow e654' X 7C K X vnth FBTD `~ D20$'. u~erraamerPrnrwe~tm X?C X X uw wdi on mv mme cen airtig me P~ w~ea reain. ``~ }~ x X :ihwt~oints W15'-$034' X X X X XXXX G.'ttt 1tC^. Lae H~~ Drilted 8 Cased by Nabars 27-e 9+18102 0.lDO Initial Completion Nabors4es I Perfs 71~DC I L.a~ HJme 'Add uneompleted squeQZa dnfl art and fish 7' Hatiiburton ~:oat Co(:ar 6.~~a' 7' Halliburfon ficat sltce 9,443' MILNE POINT UNIT WELL No.: S-21i API : 50-029-23065-00 BP EXPLORATION (AK) • ~ Area of Review PI-05 '~~~ ~"~ _ - \ ~ /~ 0? p i '~~~ ~ , ~ ., ~ ~ MPF~-~'~ ~ ~~ PH-12 i-01 ~ , ., ~ MPS-35 ` ~~~ . ' MPS-3 ~.2 . MPH- ; 0 FS-34L~ ~ }. t. PH- \ S-28 . , ,~ ~ , ~ , 1 ~ MPS-34 ~~~ ~ ~ MPH-09 1~ ~ ~ 'r \ / ~ 1~4 m ~ ~ e PS-~ \~, S-20 ~ standoff ` ~ \ ~~ ~ ~ -- ~ ~ '. 1~7L1 ~- ~.1PH-07AL1~ ~~~ PS-30 ~ ~ ~ ~ / ~A> ~ S M P H-17 ~-~, S-,4 ~ Well T e MPH-02 roducer MPH-05 roducer MPH-06 In'ector MPS-21 In~ector S ueezed MPS-27 & L1 producer M PS-32 roducer MPS-34 L1 &L2 producer MPS-35 producer ~ MPS-01 A Coherency Map ~ Seismic Profile ~ i about:blank i Johnson, David A. (Fairweather) wrote, On 5/16/2007 9:28 AM: Tom, C~ ' The correct volume for the Crete is 79 BBLS and 292 sxs. See correct table attached. Casing Size 7", 26.0#, L-80, TCII Intermediate Casing Tail cement = 986' MD to 7910' with 40% Excess over Gauge Hole. Bas~s ~ead Cement = 2297' MD to 500' above TUZC with Excess over Gauge Hole. TOC @ 5413' MD. Design Based on circulating densities. Total Cement Spacer 20 bbl of MudPush Volume: 107 bbt Spacer 20 bbl of MudPush Lead 79 bbl, 292 sx Crete mixed at 12.5 Ib/gal & 1.52 ft3/sx Tail 34 bbl, 164 sx "G" mixed at 15.8 Ib/gal & 1.17 ft3/sx Temp BHST ~80°F from SOR ' -----Original Message----- ', From: Thomas Maunder [mailto:tom maunder@admin.state.ak.us] Sent: Wednesday, May 16, 2007 8:58 AM ; To; Johnson, David A. (Fairweather) ', Cc: Kara, Danny T ' Subject: MPH-17 Dave, I am reviewing the permit application. 1. The numbers/calculations are not working for the 7" cement. On the 401 sheet the sack count for the "Crete" is given as 268. In the more detailed information on page 3, the sack count is given as 292 at 1.52 yield. A volume of 90 bbls is also given. My calculation for the 292 sx @ 1.52 yield is 79 bbls. Could you reconcile these numbers? Call or message with any questions. Tom Maunder, PE AOGCC 1 of 1 5/16l200'7 9:50 AM RE: MPH-17 Tom, The maximum injection pressure is 2500 psi. We plan to test the casing initially to 2500 psi. After the tubing is landed we will test the casing and tubing to 3000 psi (1.2 times max pressure). A bond log wi11 be run on the 7'~ intermediate casing. Dave -----Original Message----- From: Thomas Maunder [n~ai.lto:~o~c: zna.urder.-i~?ad:rir.i_state.ak.t:sl Sent: Sunday, May 20, 2007 3:55 PM To: Johnson, David A. (Fairweather) Cc: Kara, Danny T Subject: MPH-17 Dave, Just a couple of items. 1. What is the test pressure you plan for the 7~' casing? If it is greater than 3000 psi and you plan to use the BOP, then the BOP test pressure must be higher. 2. A bond log is necessary on the 7" casing since this is an injector. I did not see that mentioned in the program. Look forward to your response, Tom Maunder, PE AOGCC 1 of 1 5/21/2007 7:00 AM • ~ Re: MPH-17 Packer Setting Depths ~ • There should not be a problem here. In the cover letter with the application, lay out your proposal and the mitigation steps (premium connections, high cement, etc). In the Nanuq and Fiord injection orders, there are rules that allow packers more than 200' tvd above the top of the injection zone. Check AIOs 28, 29 and 30 on our web site. Call or message with any questions. Tom Maunder, PE AOGCC Johnson, David A. (Fairweather) wrote, On 4/27/2007 6:59 AM: Tom, We are planning to drill and complete MPH-17 as a single string NB/NE/OA injector with the NB/NE sands behind perfotated 7" Intermediate casing and the OA laferaf completed with a 3-1/2" injection screens and swell packers. The completion is designed to utilize TAM Freecap Swell Packers and Resinject screens with sized ports to control injection. The asset also needs to utilize an injection mandrel for the NB sand to allow them to regulate the flow to it and or isolate it. It is anticipated that the NB sand will have the greatest injection capacity. In order to operate/change the injection valve, it has to be accessible by wireline. Coil tubing is unable to operate the kick tool needed for the side pocket mandrel. Wireline cannot operate at angles greater than 65 degrees which would require placing the top packer 1400' MD (450' VD) above the top perforations. The setting point would be in the Ugnu. I have attached a diagram for your review which shows the injection mandrel placed at 63 degrees on the proposed directional plan (also attached). On completion we would set the mandrel as close as possibfe to 65 degrees wifh the anticipated distance between the perforations and packer at 1100' to 1400'. The 7" casing would have premium threads and quality cement above the packer setting point. A cement bond log would be run. Is it possible to get-~n variance to regulation 20 AAC 25.412 requiring that the packer be placed within 200' of the top of the perforations? If so, what requirements would have to be met? We currently are starting an area of revie~v: =The anticipated spud date is early June. I will try to call after you have had time to review this. Thanks. Dave «Johnson, David A. (Fairweather) (john23~BP,com).vcf» «BP MPH -17 Well ResLink Resinje~t Proposed.ZlP» «Formation Topsrev.xls» «MPH-17 wp_10.ZIP» _~ CE ~~ ~~ ~ 1 of 1 5/22/2007 7:32 AM David, ~ ~~~~"' V?~~ ' a Alaska Department of Natural Resources Land Administration System Page 1 of 4 • ~ ~~ ~ ~ .... ~~ ~ g ~ ~~~ ~ ~ ~ < ~ ~f~~ ~~~ : ~~~al'~e~`s ~~~rch State Cabins ~kt11~1 R~S+D411'+~5 ~ .. ._ ,e...., ,~ , , , . .. ~~~.~T .,. A[aska DNR Case Summary File Type A~~ ; File Number: ~ 375132 ~, ~o-~+ Pri_.n.table Case F.ile_Summ....a..ry See Township, Range, Section and Acreage? ~ ~,~ ~~ ~ Yes ~"` No ~~~ ,~~~_~. http ://www. dnr. state. ak.us/las/C ase_Summary. cfm?F ileType=ADL&F ileNumber=3 7513 2... 5/ 15/2007 f Alaska Department of Natural Resources Land Administration System Page 2 of 4 • i http://www.dnr. state. ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=3 75132... 5/15/2007 ~ " 4 Alaska Department of Natura~ Resources Land Administration System Page 3 of 4 ~ ~ ~ Last updated on 05/15/2007. http://www.dnr. state. ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=3 75132... 5/ 15/2007 ~ Sondra D. Stewman BP Exploration AK INC. PO Box 196612 MB 7-5 Anchorage, AK 99519-6612 "Mastercard Check" DATE ~~ - ~ ~~ v~ PAY TO THE ~^'~ ~° /'1 , $ ~ ~~/~ ORDER OF ~/ C Z~~~ , ~)~7 '-" ~ 89-6/1252 1 64 DOLLARS First National`Bank Alaska Anchorage, AK 99501 `~~ j , ,_ MEMO ~ ' ~ ~ t ~ ~ ~: L 25 200060~:99 L46 2 2? i 564~~' 0 ~64 . ~ ~ TRAYSMIT'~'AL LE'~'TER CHECKLIST WELL r~NIE ~~~~ /~ PTD# ar'0~0660 Devetopment / Servtce ~xploratory• Stratigraphic Test Yon-Conventional We![ Circle Appropriate Letter / Paragraphs to be included ia Traasm{ttal Letter .' CE~CK i ADD-OiYS ! T'EXZ' FOR APPROVAL LETTER ; ~ w~T i (OPT[ONS) i ~ ~ APPLIES ~ + ~ ; ; i MliLTI LATER.AL ~ I (If (ast two digits in ~ API number are ~ between 60-69) , The perrnit is for a new we{lbore segment of existing wel l Permit No. , APC No. ~0- - ---- Productioa shoutd coatinec+e to be reported as a function of the original 4PI number stated above. i P[LOT E[OLE i[n acc~rdac~ce with 20 A.AC 2~.OU~(~, al! records, data and to~s I ~ acquired for the piiot hole must be ctearly differentiated in both i ; w~ll name ( Pf-n and API number I ~ '~~~' - -_~ Prom records, data and logs ~ acquired for we(t • I ~ SPACING The perrnit is approved subject to fi~tl comptiance with 20 AAC ' EXCEPTION ~ ~ 2~.OS~. Approva! to perforate and produce / inj~ct is contingent ~ i i I upon issuance of a conservation order approving a spacing j l exceptiort ' ~ . assum~s the ~ liabi[ity of any protest to the spacing exception that may occur. i ; DRY DCI'CH ~ ~ AI[ dry ditch sample sets submitted to the-Eomrnission must be in ;~ i SA!~IPLE I no greatcr than 30' sampie intetvals from below the pecmafrost or ; ~ I from w6ere samptes are frst caught and 10' sample intervals ; ; ~ through target zones. ; ~ ~No (i Converttional ~ Please note the followinq. special condition of this permit: ; ~ production or production testing of coal bed methane is noc allowed i i for (name of wetl) until after (Corn~y Nam~has designed and ! ~~mptementcd a water weli testing program to provide base(ine data ; on water quality and quantity. (Company Name) must coatact the ~ ~ Cvmmission to obtain advance approval of such water we!! testing ! ~ program. I Rev: t '2~%06 C:` jody~trartsmittal_checklist , ,t A ~ . ~r' . . ~ . ~, ~ ~ _, . ~.,~~~;{,,.~~~as , ,,, v1 , ~ _ ~;~~ s ~ ~ ~ _ ~ ~ ^^ ~ N ~ , , , , , , , ~ , m o a~ Q , , , , , , ~ , N N ~ 0 , , , o ~ ~ ~ , , , , , ~ , ~ c , , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~, ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Q ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ , ~ ~ ~ ~~~ ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~, ~ ~ ~ ~ ~ , ~ ~ ~ , ~ ~ ~ ~~ ~ ~, ~~, ~~ ~ ~ ~~ ~ ,~, ~ ~ ~ ~ ~ , , , ~i ~ 3 ,~~, ~ ~ O d , Q a , J o , ~ , ~ , , , ~, a y •S , ~, ~, , ~ I ~~ ~ w~ ~ ~ , , , , ~ ~ ~ ~ ~ , ~~ , ~ ~ ~ ~ ~ ~~ ~, ~, oi, , o, ~ ~ ~° ~ I ~ , , ~ , ~~ O ~ , ~ ~ ~ ~ ~ ~ ~ ~ ' ~ ~ ~ ~ ~ >~ ~ a a ~ ~ ~ ~ ~, ~ ~ C E O ~ , ~ ~ , , ~ , ~ ~ ~ ~ ~ .-, -~~ ~ , ~ ~ ~ o o fl. L~ ~ ~ ~ C ~,, ~ `~ ~ , , ~ ~ M . ~ ~ ~~ ,~ m , , ~ , ~ ~ o ~ ~ ~ ~ ~ , ~ , ' , , ~ , ~ ~ ~ a, ~ , ~ ~ ~ , , O ~ y ~ C~ • ~ , , N ~ a , . ~, i , , a , , ~; N, ~ ~ ~ ~ o ~ ~ l ; , ; 3 ~ ~ M ~ N , a ~ V~ ' ~~ ~ ~ ~ ~ G~ M ~ , ~ ~ ~ . ~ ~ ~ ~ , , , d~ , ~ ~ ~ ~ ~ ~ ~~ , U, , G ~ ~~ ~ ~ f~~ ~ , ~ , ~ , , , ~ ~, ~, t, ~. ~~~ ~ ~ z~ ~ ~ ~ , , , , J , ~ fl. 4 ~, ~ ~ , , ~ r I M 4 ~, ~ ~ ~ ~ ~ ~ ~ ~ , , . , , . ~ ~ , ~ , , , , ~ ~ ~ ~ ~ ~ N~ ~ ~ ~ ~~.. ~ ~ . Q~ ~ ~ , ~ : ~ •Q ~ ~ C~ ~~-y~ ~ W~ , a~ , ~~~ ~ O~ , , ` k..~ ~ p: C~ ~ I . ~ ~ , ~ . ~ ~ ~ ~ ~ ~ , ~ ~ ~ , ~ ~ ~ ~ a, ~ ~ N~ ~ ~ , ~ Z, ~ ~ ~~ ~ m~ ~ ,-~~ ~, , ~ ~ ~ Z ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ , ~ ~ . ~, . . . , y, ~ C, , ~~ , ~, , , p, N, a~ ~ ~ , m ~ ~ . ~ ~ ~ ~ , ~ ~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ . , ~ N~ ' . , ~~~ , ~ ~ : . , ~ ~ ~ ~ N, , ~~ ~ > , ~, ~ p ~ N ~ C ~~~ ~~ M ~ ~ O_ ~ ~ , N ~ ~ ~ 0..~ ~ ~ ~ ~ ~ , . ~, ~ ~ Z~ , ~~ ~ ~ ~~ ~ ~ ~ a a~ ~~~ y~ S N~ ~. ~ ~ Z ~ , , ~ ~ ~ ~ ~ m , ~ ~ ~ , ~ , ~ ~ , , ~ ~ ~ ~ ~~ ~ ~ ~ i , L.L, ~ ~ ~ ~ ~ ~ ~ , ~~ . ~ ~ ~~, ~ ~~ : ~ ~ ~ o~ '~ , `, Z~ , m, ~ ~~ ~~ , ~ ~ ~ ~ ~ °~ , o ' Q ~, ~° cn ~ f6 W , ~ m, , , rn, ~ 2, v a, N, ~, co ~, ~, , , ~~, Q, i i rn ' ~ Z ~ ~ , ~, ~ ~ ~ ~, ~ ~ ~ 4, ~ ~ ~~~ ~ ~ ~ ~ ~ in, t, ~~ ~ o~ ~ ~ ~ ~° a, c. ~ ~ • v,~ ~ ~~ , ~ v~~ ~ ~~p ~ ~ ~ ~ , ~„~ ~ • ~ ~ ~ ~ ~ ~, ~ ~ , ~ , ~, , p~ , ~ ~ ~ ~~~ ~ ~ ~ ~ c~ ~ •~, ~ ~ ~ '~, i, ~ ~ ~ a ~ ~~, ~ N ~ o~ ~ a~~ ~~ ~ ~ ~ ~ ~ Q , ~ ,~ , it, a, ~ , , _, a, 4 , ~: Q ~ Q ir ~, , Q ~ x ~ ~ y~ o ~ ~, o, a~ o Z ~ , a; 00, ¢ c~i i ,~, „°Y ~ , c a '~ ~, ~; a~ ~ ~ , ~ ; • M ; _ +' .N m; ~ o N ~ ~ , ~~ . , , ~ ~ , ~ , , , , Y ~ C~ ~ ~ ~ ~ , ~~ O, _, ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~, ~ ~, ~ ~~ •, ~ ~~ ~'X~ i c ~ ~~ ,~~ ~ ~(n~ ~ ~~ , y~ ~ p~ ~, ~-~ _~ . , ~~ N~ ~ Z C , , ca O a, ~ _ ~ rn o, X ~u Q ~ 3, I d, , ~ ~ 0°' a ~' Q `~ ~ ° ~, g ~ °O ~ o' I a ; ; ; , , , -; ; ; I 4 ; ~ ; ; ; ' ; ; ~ ~ ~, N~ ~ tq, ~, (p~ UA tq~ ~~~. ~ ~ fp~ ~ y~ ~ UT ~ tq~ (/b ~~, fA~ fA~ ~~ N ~ fp~ t~~ ~.~. Qo M~ fA~ ~Q~a f/D o~ M, ~ ~ M~ Q~ M~ f~~ dD fA~ fp~ ~~~~~, M~ fA~ ~o~ ~ Vi~ ~ ~ Q f/1~ ~, ~~~~ ~ a T ~- ~- ~- ~. } ~ } ~- ~-~- ~~ } }} ZZ }Z~Z Z} ~- Z} ~-}}~~ ~-Z} ~ ~ Z } N ~ , , ; , ~ ~ , ~ ~ ~ ~ , ~ ~ , ~ . ~ ~ ~ ~ ~ , , ~ ~ ~ , ~ ~ ~ , ~ ~ ~ ~ ~ , O ~ ~ , , ~ ~ ~ ~ ~ , , ~ ~ ~ ~ ~ ~ ~ ~ , ~ f 6 ~ ~ ~ ~ ~ , ~ ~ ~ ~ , ~ , ~ ~ V , ~ , ~ ~ ~ ~ ~ , ~ , ~ y~ ~ ~ O' i ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . , ~ . ~ ~ ~ ~ 'C ~ ~ , ~ , ~ , ~ ~ ~ ~ ~ , ~ , ~ , , ~ ~ , ~ ~ C~ ~ ~ ~ ~~ 3 , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ , , , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ ~ , I ~ ~ ~ ~ I ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ U~ ~ V~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ C ~ N, ~ ~ , ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ , ~ ` p p ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ , ~ . ~ ~~ ~ ~ ~ p~ v~ ~ , ~ , . , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ ~ , ~ , ~ ~ ~ ~ ~ ~ ~ T ~ ~ ~ ~ ~ ~ ~ ~ N N ~ ~- C p ~ ~ , . , ~ , , ~ , ~ ~ , , ~ , ~ , ~ ~ ~ ~ ~ ~ ~ ~~ O, ~~ ~~ . ~ ~ ~ ~ ~ ~ ~ , ~ , ~ , , ~ ~ ~ ~ ~ ~ , ~ , ~ ~ , ~ . , , ~ , ~ ~ I , , ~ ~ ~ ~ ~ , ~^y~ ~ O J( ~ ~ , , ~ , ~ ~ ~ , ~ , ~~ ~~ -° 3 ~~ , ~ , ~ . ~ , ~ ~ ~ ~ ~ , ~ , ~ ~ ~ ~ ~ . ~ ~~ O O , , , , , O ~, ~,~, , ~, ~ Z` m , ` , i ' o Z, t D I , ~ i 1 a~i E Z ~' N ; ~, ` ' ~ , Z , , ~ , ~ ~ a~i `~ ' ~ N, ~ Q , ;? o o ~n o °x° ~ w , , ~ ~ ~ o, c ~ a> ~ ,C , , ~ Q , 3 ~ , u-, ~, a~ ~ a ~ ~ s° , ~ Q. 4 ~ a, o Q ' y, °~ ~ o; , c, ' a~ ~ ' ~ ~y a' ~ ,n ~6 fn w o Q \ 2 '~ , `~ 'i' , v o, ~ -o, a~, N~ !=, u~ ~ ~, ~ otY ~, ` m ~ ~ ~, v, a o ~, a ~ , ~~ a i ~ ~ N ~ ~ u ~ 3 ~, y w, •~ . ~ a o y, o N o , N ~, u~ ~ ~ > ~ a~ i , , , o~ ~ •~ ; o, ~m 3 , ~.a o: Mo, ~, ~ o ~, ,N a ~ ~ , ~ o, , n~, 3 o ~ a ~ N, ! ,J'~ Z V , , c, t ~ , , ~, `6 N ~ ~ 3~ ~ ~ri ~ ~ m ~, ots, E' avi' ~' .~ o~ ~' ; Q' ~ u'i' vi ~' ? -~ o ~ -~ o~ ~:~, v ~ N, o. °• ~ o c ~, o~ ~p o p~ ~ a, .c, ~, ~, ~ c, ~ o ,. O a ~ Q „ l W i E, , o E, o =', ~a v; ~ c ., c' E' o.~, ~ ~' ~ ~o, o M, ~~ ~~'N 3 0 >~ ~ U ... 'a a o ~, a ~~ ~~, ~= ~ o ~ n ~ y, o a~ , ~ ~3 ~. o a , N, ~ a N N T ~ ~' ~ o ~~ 'y ~ Z ~ ~ ~ ~ v; ~ ~ ~ ui o o, Q ~, ~ m ~ ~ ~ , . i , , ~ ( ~ ~ O m, ~, Y V1 QI ~ 7 ~ . ~ ~ ~~ p~ ~~ ~ Q V, ~~ V~ . ~ ~~ ~~ ~ O ~ ~ 7 7 ~ ~ •.~- ~ ' a f 0 ~ ~ ~ O~ N~ ~ ~ ~ Y ~~ ~, ~ , ~~ O~ ' ~~ ~' 0~ p' ' ~, 6, ~~ ~, Q~ ~ ~ ' ~~ Q~ ~~ N~ N~ O~ N~ T ~ f6~ pi p. ~~ 3~ ~. -, N~ ~, . ~ g I Q ~ ~ ~, c, ~ .Q~ m, ~ ~, ~ ~ s.c ~ C ~ m ~ m, _ a, ~, ~ E ~ r 4~. ~ ~.- m, S ~,; ~ •- a~ ~~ N a a 3 ° L 0 , ~~ _ o~- 3, ~ z m, a c~, ~ a c N ca m fl. o. ~, v ~ 3, a~°i `° ~, v E a N~ ~ ~~, ~ ~ o~, ~ ~~, ° a~ ~n o 3 a i' iu a~i `o' w o U o O o ~ c~ w, a > o m o~ -o a; o ~•~, a c o a~i o o s ~ o' ' ~ a~ ' ~0 -°' ~' ' L°~ v ' Q ~' ~' ' a 1- ~ `o: ~~ ~ ~ ~, ~6 ~ ~, o, ~ ~, Q ~, ~, o o - a i Y o ~, ' i E a m rn o o I • , u S a i ~, ~ c p u~ , ~ u~, m a~ d a ~ ~ ~ ° °3 °3 -~ ~~ ~ ~ ' ' ~ v ' ` G U~ T , ~3~ N~ : ~ p~ a ~ C~ C~ ~ ~ U, f0, f0 O ~, , O O~ N ~ 4 N ~, , . . (6 Y ~ , , . Vl, C~ m fl- (6 (6 (0 ~ N ~ ~~ p (6 ~ Q N p ~ f ~ T ' 'C~ . O, ~ ~ S~ . G ~ . ~ -p~ y , O p. ' ~ . a ~ ~, ~~ fQ C~ d C~ . fl. N~ N~ T !6 ~ ~~ ~~ N 3~ ~~ ~ m ~ ~L' C a a C, N~ 1', ~ i N 6 , p, ~ Q I ~~ ,Q ~ ~~ ~~ N >, N~ ll d f6~ ~, _~ "a, -p, "p~ U~ • ~ C~ ~~ ~~ .L]~ ~ ~ ~~ ~~ ~~ c' y~ 'N~ N~ N. >~ ~ o. ~~ L~ ~ 3' ~ ~ ~ N~ ~ _a ~c " V~ ~' .Q~ C~ (4 C' E~ ~ .. E a~, a~ a~~ ..~ ~, m -o o~ a o ~ ~ 3, ~, ~ ~' a v m ~°' m' ` N ~, a~' _ _ , _ o~ ~ -° m `° o ~ m c a~, m c, '° ~ ~, " w ~ V°-~ ~ c, 3, m, m o ~ ° ° ca, u °~ ~ ~ ~ o o, ~ ~' ~, E m °'~, ° ~ c ~ o ~, ~ a~ o, o, _ ~° ~, m: = a; m ~~ vi, °r ~ - ~, .~ a~ c 3~ `~ m, °, ~~ ~ v ~~ ~~ d ml ~, a~ `~ ~, - - -' - - -' '~ ' ~ m ~, ~ ~ a - a~, - 3 ° °` c c '~° , ~' ~" c ~ ' ~ ~, m m, ~ w W a a o ~ ~ ~~ ~ ~ ~ °r t6 m y m c ~i ,~ 1 ` >, m, ~, a~ v ~, °~ °~ ' ' °~ ' ~ ~, i, a a a~, a~, o. a , a~ a~ ' c m , °~ - ' ~ o ' t o, ~~' ~; ' un ~' m ' v ' ~a -o, , = `o ~- O' O, ~, °' ° ai I ~ , ~ m , a~, a~ o m q V ~„ ~ n., -+, ~, ~ , ~ , ~ , ~n, '~; o; o~ a a ~ a; ~ a z ~, ~; ~ ~ ~; ~ a - a, ~ "_, ~, m m, ~ ~ `~ ~ a, ° ~'~. ~ ~ `~ h a ~ ~ N M'V' ~ (O I~ c0 O ~ N M V ~ ~ CO f~ 00 ~ O N N N M N N V N tl') (O N N f~ CO ~ O N N N M M N M V M M M ~ M_ (D M I~ ~0 ~ M M M U _ ._ `__ - _ _ ( ~ +r CV +' fV "" (V C U ~ Cfl ~ 'a+ L ~ e~- tn ~ ~ ~ ~ ~ N ~ to ~ ~ ~n O y ~ E ~ N ' ~ ~ ~ ! ~, ~o C\ ~ ~ a ~ ~ ~~ ~ ~ I o Q~ ~ q a a a a W a~ ~ a Q . Well f-iistory File APPENDIX Information of detailed nature that is not i paKicula~iy geRnane to the Welt Permitting Process but is part of the history file. To improve the readability of the Well History file and to simpl~fy finding information, information of this nature is accumulated at the end oi the file under APPENDIX. No special efiforl has been made to chronologically organize this category of information. r , . ~ MPH17PB1007012007SSN.tXt Sperry-Sun Drillin9 Services LIS Scan Utility $rtevi si on : 3 S LisLib $Revision: 4 $ wed Dec 19 13:31:41 2007 Reel Header Service name .............LISTPE Date . ...................07/12/19 Ori 9in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS ~zs writing ~ibrary Tape Header Service name .............LISTPE Date . ...................07/12/19 Origin ...................5T5 Tape Name. .... ........UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comment5 .................STS LIS Writing Library. Physical EOF Comment Record TAPE HEADER Milne Point Unit MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 Mw0005042668 A. MUNRO G. BURLEY # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: # WELL CASING RECORD scientific Technical services scientific Technical services MPH-17 PB1 500292335870 BP Exploration (Alaska) Inc Sperry ~rilling Services 10-DEC-07 34 13N lOE 2997 3995 69.80 35.70 Page 1 t~ ~~ ~, fi~ ~ ;. p~~ ~ a 2aa7 ai~sKa ~il «~~s ~~e~~~~. ~~~~'missirr ,~?. ~~,h~z ~~~~ ~~ ~6'~---lX°fr~ ~ ~5~9~ ~ ~ 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING # REMARKS: MPH17PB100701200755N.tXt OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 12.250 20.000 112.0 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 1 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 4. THIS WELLBORE WAS PLUGGED BACK DUE TO DIRECTIONAL ISSUES. 5. DATA FROM MPH-17 PBl WERE NOT SHIFTED BECAUSE THERE WERE NO SHALLOW DATA TO SHIFT TO. 6. MWD RUN 1 REPRESENTS WELL MPH-17 PB1 WITH API#: 50-029-23358-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF 453~MD/452'ND. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ File Header Service name... .......STSLIB.001 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/12/19 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.000 Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted and DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE RPD 1 clipped curves; all bit runs merged. .5000 START DEPTH STOP DEPTH 159.5 389.5 Page 2 ~ • MPH17PB1007012007SSN.txt RPM 159.5 389.5 RPS 159.5 389.5 RPx 159.5 389.5 FET 159.5 240.5 GR 167.0 397.5 ROP 222.5 449.5 $ # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MwD 1 159.5 449.5 $ # REMARKS: MERGED MAIN PASS, $ # Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Log~ing Direction .................Down optical log depth units...........Feet ~ata Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined ,4bsent value ......................-999 Depth Units. . .. .. ..... ~atum Specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MWD OHMM 4 1 68 4 2 RPM MWD OHMM 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPX MWD OHMM 4 1 68 16 5 FET MWD HOUR 4 1 68 20 6 GR MWD API 4 1 68 24 7 ROP MWD FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 159.5 449.5 304.5 581 159.5 449.5 RPD MwD OHMM 3.83 151.94 42.8788 461 159.5 389.5 RPM MwD OHMM 3.53 225.64 47.2383 461 159.5 389.5 RPS MwD OHMM 3.17 162.38 37.7054 461 159.5 389.5 RPx MwD OHMM 2.77 68.62 24.6148 461 159.5 389.5 FET MwD HOUR 12.14 13.24 12.6918 163 159.5 240.5 GR Mw~ ,4PI 22.61 84.69 49.3933 462 167 397.5 ROP MwD FT/H 0.29 274.68 140.937 455 222.5 449.5 First Reading For Entire File..........159.5 ~ast Reading For Entire File...........449.5 File Trailer Page 3 ~ ~ MPH17PB100701200755N.tXt Service name... .......STSLIB.001 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/12/19 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.002 Phy5iCd1 EOF File Header Service name... .......STSLIB.002 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/12/19 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......5T5LIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH RPD 159.5 RPM 159.5 RPS 159.5 RPx 159.5 FET 159.5 GR 167.0 ROP 222.5 $ # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME); TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ # STOP DEPTH 389.5 389.5 389.5 389.5 240.5 397.5 449.5 BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): Ol-lUL-07 Insite 74.11 Memory 453.0 222.0 453.0 .0 .0 TOOL NUMBER 230386 116184 12.250 Page 4 l~_J ~ MPH17PB1007012007SSN.tXt # BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 9.00 MUD VISCOSITY (S): 140.0 MUD PH: 7,Q MUD CHLORIDES (PPM): 700 FLUID LOSS (C3): .O RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 3.800 48.0 MUD AT MAX CIRCULATING TERMPERATURE: 7.770 20.0 MUD FILTRATE AT MT: 1.620 48.0 MUD CAKE AT MT: 2.900 48.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: # ~ata Format specification Record Data Record Type... .. .......0 ~ata specification Block Type.....0 Log~ing Direction .................DOwn optical log depth units...........Feet ~ata Reference Point ..............undefined Frame spacing....... ............60 .lIN Max frames per record .............undefined absent value ......................-999 Depth Units. . .. .. ..... Datum specification Block sub-type...0 Name Service order units Size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MWDO10 OHMM 4 1 68 4 2 RPM MWDO10 OHMM 4 1 68 8 3 RPS MWDO10 OHMM 4 1 68 12 4 RPX MWDO10 OHMM 4 1 68 16 5 FET MWDO10 HOUR 4 1 68 20 6 GR MWDO10 API 4 1 68 24 7 ROP MWDO10 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 159.5 449.5 304.5 581 159.5 449.5 RPD MWDO10 OHMM 3.83 151.94 42.8788 461 159.5 389.5 RPM MWDO10 OHMM 3.53 225.64 47.2383 461 159.5 389.5 rtPS MWDO10 OHMM 3.17 162.38 37.7054 461 159.5 389.5 RPx MWDO10 OHMM 2.77 68.62 24.6148 461 159.5 389.5 FET MwD010 HOUR 12.14 13.24 12.6918 163 159.5 240.5 GR MwD010 ,4PI 22.61 84.69 49.3933 462 167 397.5 ROP MwD010 FT/H 0.29 274.68 140.937 455 222.5 449.5 First Reading For Entire File..........159.5 ~ast Reading For Entire File...........449.5 Page 5 ~~ MPH17PB1007012007SSN.tXt File Trailer Service name... .......STSLIB.002 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/12/19 Maximum Physical Record..65535 File TyPe ................LO Next File Name...........STSLIB.003 Physical EOF Tape Trailer Service name .............LISTPE Date . ...................07/12/19 Origin ...................STs Tape Name...... ........UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library. Reel Trailer Service name .............LISTPE oate . ...................07/12/19 Ori 9in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Writing Library. Physical EOF Physical EOF End Of LIS File ~ scientific Technical services Scientific Technical Services Page 6 ~ mph-17pbl.tapx Sperry-Sun Drilliny Services LIS SCan Utility $Revision: 3 $ LisLib $Revision: 4 $ wed Dec 19 13:31:41 2007 Reel Header Service name .............LISTPE oate . ...................07/12/19 Ori 9in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library. Tape Header Service name .............LISTPE Date . ...................07/12/19 Origin ...................STs Tape Name. .... ........UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................5T5 LIS Writing Physical EoF comment rtecord TAPE HEADER Milne Point Unit MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 Mw0005042668 A. MUNRO G. BURLEY # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY Bl15HING: DERRICK FLOOR: GROUND LEVEL: # WELL CASING RECORD ~ scientific Technical servi~es ~ibrary. Scientific Technical Services MPH-17 PB1 REDO 500292335870 BP Exploration (,4laska) inc Sperry Drilling Services 10-DEC-07 34 13N lOE 2997 3995 69.80 35.70 Page 1 U~~ ~~~-p~C~ ~t5f3~ ~ ~ 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING # REMARKS: mph-17pbl.tapx OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 12.250 20.000 112.0 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 1 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 4. THIS WELLBORE WAS PLUGGED BACK DUE TO DIRECTIONAL ISSUES. 5. DATA FROM MPH-17 PB1 WERE NOT SHIFTED BECAUSE THERE WERE NO SHALLOW DATA TO SHIFT TO. 6. MWD RUN 1 REPRESENTS WELL MPH-17 PB1 WITH API#: 50-029-23358-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF 453'MD/452'ND. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ File Header Service name... .......STSLIB.001 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/12/19 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD ~epth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 # FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH RPD 159.5 389.5 Page 2 ~ ~ mph-17pbl.tapx RPM 159.5 389.5 RPS 159.5 389.5 RPx 159.5 389.5 FET 159.5 240.5 GR 167.0 397.5 ROP 222.5 449.5 $ # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE Mw~ 1 159.5 449.5 $ # REMARKS: MERGED MAIN PASS. $ # ~ata Format specification Record Data Record Type... ..........0 ~ata specification slock Type.....0 Log~ing Direction .................DOwn optical log depth units...........Feet ~ata Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. . .. .. ..... ~atum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MWD OHMM 4 1 68 4 2 RPM MWD OHMM 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPX MWD OHMM 4 1 68 16 5 FET MWD HOUR 4 1 68 20 6 GR MWD API 4 1 68 24 7 ROP MWD FT/H 4 1 68 28 8 First Last Name Servi ce Unit Min Max Mean Nsam Reading Reading DEPT FT 159.5 449.5 304.5 581 159.5 449.5 RPD MwD OHMM 3.83 151.94 42.8788 461 159.5 389.5 RPM MwD OHMM 3.53 225.64 47.2383 461 159.5 389.5 RPS MwD OHMM 3.17 162.38 37.7054 461 159.5 389.5 RPx MwD OHMM 2.77 68.62 24.6148 461 159.5 389.5 FET MwD HOUR 12.14 13.24 12.6918 163 159.5 240.5 GR MwD API 22.61 84.69 49.3933 462 167 397.5 RoP Mw~ FT/H 0.29 274.68 140.937 455 222.5 449.5 First Reading For Entire File..........159.5 ~ast Reading For Entire File...........449.5 File Trailer Page 3 . ~ mph-17pbl.tapx Service name... .......STSLIB.001 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/12/19 Maximum Physical Record..65535 File Ty e ................LO Next Fi~e Name...........STSLIB.002 Physical EOF File Header Service name... .......STSLIB.002 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/12/19 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH RPD 159.5 RPM 159.5 RPS 159.5 RPx 159.5 FET 159.5 GR 167.0 ROP 222.5 $ # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ # STOP DEPTH 389.5 389.5 389.5 389.5 240.5 397.5 449.5 BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): O1-JUL-07 Insite 74.11 Memory 453.0 222.0 453.0 .0 .0 TOOL NUMBER 230386 116184 12.250 Page 4 . ~ mph-17pbl.tapx # BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 9.00 MUD VISCOSITY (S): 140.0 MUD PH: 7.0 MUD CHLORIDES (PPM): 700 FLUID LOSS (C3): .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 3.800 48.0 MUD AT MAX CIRCULATING TERMPERATURE: 7.770 20.0 MUD FILTRATE AT MT: 1.620 48.0 MUD CAKE AT MT: 2.900 48.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN); # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: # Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Log~ing Direction .................DOwn Optical log depth units...........Feet ~ata Reference Point ..............undefined Frame spacing....... ............60 .lIN Max frames per record .............undefined ,4bsent value ......................-999 Depth units. . .. .. ..... Datum Specification Block sub-type...0 Name service Order units size Nsam Rep Code offset channel DEPT FT 4 1 68 0 1 RPD MWDO10 OHMM 4 1 68 4 2 RPM MWDO10 OHMM 4 1 68 8 3 RPS MWDO10 OHMM 4 1 68 12 4 RPX MWDO10 OHMM 4 1 68 16 5 FET MWDO10 HOUR 4 1 68 20 6 GR MWDO10 API 4 1 68 24 7 ROP MWDO10 FT/H 4 1 68 28 8 First Last Name Sel"vi C2 Ulli t M~ 11 M1X M2d11 Nsam Readi ng Readi ng DEPT FT 159.5 449.5 304.5 581 159.5 449.5 RPD MWDO10 OHMM 3.83 151.94 42.8788 461 159.5 389.5 RPM MwD010 OHMM 3.53 225.64 47.2383 461 159.5 389.5 RPS MwD010 OHMM 3.17 162.38 37.7054 461 159.5 389.5 RPx MWDO10 OHMM 2.77 68.62 24.6148 461 159.5 389.5 FET Mw~010 HOUR 12.14 13.24 12.6918 163 159.5 240.5 GR MWDO10 API 22.61 84.69 49.3933 462 167 397.5 RoP Mw~010 FT/H 0.29 274.68 140.937 455 222.5 449.5 First Reading For Entire File..........159.5 ~ast Reading For Entire File...........449.5 Page 5 • mph-17pbl.tapx File Trailer Service name... .......STSLIB.002 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/12/19 Maximum Physical ttecord..65535 File Type ................LO Next File Name...........STSLIB.003 Physical EOF Tape Trailer Service name .............LISTPE Date . ...................07/12/19 Origin ...................STs Tape Name. .... ........UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library. Reel Trailer Service name .............LISTPE Date . ...................07/12/19 Ori in ...................STS Ree~ Name. .... ........UNKNOWN continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Writing Library Physical EOF Physical EOF End Of LIS File ~ scientific Technical Services Scientific Technical services Page 6 s ~ MPH170071820075SN.tXt Sperry-sun ~rillin9 services LIS Scan utility $Revision: 3 $ Lis~ib $Revision: 4 $ Mon Dec 10 12:48:43 2007 Reel Header Service name .............LISTPE Date . ...................07/12/10 Ori 9in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library. Tape Header Service name .............L25TPE Ddte . ...................07/12/10 origin ...................STs Tape Name. .... ........UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Library. Physical EOF Comment Record TAPE HEADER Milne Point Unit MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: ~ scientific Technical services scientific Technical services MPH-17 500292335800 BP Exploration (,4laska) znc Sperry Drilling Services 10-DEC-07 MWD RUN 3 MWD RUN 4 Mw0005042668 Mw0005042668 A. MUNRO J. BOBBITT G. BURLEY J. HABERTHUR MWD RUN 2 Mw0005042668 A. MUNRO G. BURLEY # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: # WELL CASING RECORD 34 13n l0e 2997 3995 69.80 35.70 Page 1 crL~- ac~~- -a~ C, `~ s~sv3 . ~ MPH17007182007SSN.tXt OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 15T STRING 8.500 9.625 4799.0 2ND STRING 6.125 7.000 8693.0 3RD STRING PRODUCTION STRING # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELLBORE WAS EFFECTED BY DRILLING OFF OF A CEMENT PLUG. THE KOP WAS 239'MD IN THE MPH-17 PB1 WELLBORE. 4. MWD RUN 1 REPRESENTS MPH-17 PB1. NO RUN 1 DATA ARE PRESENTED HEREIN. 5. MWD RUNS 2-4 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). MWD RUNS 3,4 ALSO INCLUDED COMPENSATED THERMAL NEUTRON (CTN) AND AZIMUTHAL LITHO-DENSITY (ALD). MWD RUN 4 ALSO INCLUDED AT-BIT INCLINATION (ABI) AND PRESSURE WHILE DRILLING (PWD). 6. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A SCHLUMBERGER CASED HOLE GAMMA RAY LOG RUN ON 21 JULY 2007. THESE DIGITAL DATA WERE PROVIDED BY D. DORTCH (SAIC/BP) ON 24 SEPTEMBER 2007. LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. THIS SHIFTED DATASET IS THE PDCL. 7. MWD RUNS 2-4 REPRESENT WELL MPH-17 WITH API#: 50-029-23358-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12550'MD/4154'ND. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). TNPS = SMOOTHED THERMAL NEUTRON POROSITY (FIXED HOLE SIZE). CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN). SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR-DETECTOR-ONLY PHOTOELECTRIC Page 2 ~ ~ MPH170071820075SN.tXt ABSORPTION FACTOR (LOW-COUNT BIN). SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. DENSLIDE = NON-ROTATED INTERVALS REFLECTING SENSOR-TO-BIT DISTANCE. PARAMETERS UTILIZED FOR POROSITY LOG PROCESSING: HOLE SIZE: 8.5~~ BIT; 6.125~~ BIT MUD WEIGHT: 9.2-9.3 PPG MUD SALINITY: 200-80000 PPM CHLORIDES FORMATION WATER SALINITY: 21000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE $ File Header Service name... .......STSLIB.001 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/12/10 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.000 Comment rtecord FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 # FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 172.5 12504.5 RPM 181.0 12511.5 RPD 181.0 12511.5 RPS 181.0 12511.5 RPx 181.0 12511.5 ROP 245.0 12562.0 FET 245.0 12511.5 FCNT 4790.0 12467.5 NCNT 4790.0 12467.5 NPHI 4790.0 12467.5 DRHO 4790.0 12483.0 RHOB 4790.0 12483.0 PEF 4790.0 12483.0 $ # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH GR 172.5 167.0 4419.5 4414.0 4425.0 4419.0 4427.5 4421.5 4434.0 4427.0 4436.0 4428.5 4444.5 4437.5 4457.0 4452.5 4496.5 4492.5 4512.5 4508.0 Page 3 4519.0 4576.5 4627.0 4636.5 4685.0 4706.5 4724.5 4738.5 4760.5 4773.5 4801.5 4850.0 4856.5 4884.5 4889.5 4915.0 4923.5 4944.0 4949.5 4960.0 4964.0 5063.5 5079.5 5104.5 5109.0 5161.0 5177.0 5191.5 5197.5 5225.5 5259.0 5287.0 5295.0 5329.0 5352.0 5362.0 5373.5 5377.5 5386.5 5408.0 5424.5 5431.5 5439.0 5471.5 5508.0 5534.5 5545.0 5561.5 5567.0 5587.0 5604.5 5620.5 5626.0 5696.0 5712.0 5743.5 5759.5 5791.0 5795.0 5807.0 5845.5 5908.0 5916.5 . 4515.0 4572.0 4621.0 4631.0 4680.5 4701.5 4718.5 4731.5 4756.0 4767.5 4797.0 4846.0 4851.0 4880.5 4886.0 4909.0 4917.0 4937.5 4942.5 4954.0 4959.0 5058.5 5074.5 5099.5 5104.0 5156.0 5171.0 5186.5 5192.0 5219.0 5254.5 5281.5 5288.5 5323.5 5346.5 5355.5 5367.5 5372.0 5380.0 5400.5 5416.5 5424.0 5433.0 5465.5 5501.5 5529.0 5539.0 5555.5 5560.0 5580.5 5596.0 5611.0 5617.0 5688.5 5703.5 5738.5 5751.5 5785.0 5788.0 5800.0 5840.0 5903.5 5909.5 MPH1700718200755N,tXt Page 4 ~ 5921.0 5937.0 5955.5 5959.5 5971.0 5981.5 6006.0 6021.5 6029.5 6037.0 6053.0 6076.5 6083.5 6097.0 6109.5 6124.0 6144.5 6155.5 6169.0 6175.5 6187.5 6204.0 6225.0 6243.0 6258.5 6278.0 6286.5 6292.0 6301.0 6309.0 6327.5 6335.0 6344.0 6349.5 6367.0 6370.0 6375.5 6454.5 6466.0 6472.5 6477.5 6482.5 6492.5 6499.5 6505.0 6512.0 6516.0 6529.5 6537.0 6546.0 6568.5 6578.0 6584.5 6595.0 6600.0 6644.5 6653.5 6655.0 6661.5 6668.0 6691.5 6705.0 6720.5 C~ 5915.0 5930.0 5949.5 5954.0 5963.0 5975.0 6000.5 6017.0 6025.5 6032.0 6046.5 6069.0 6077.0 6091.0 6102.0 6118.0 6138.0 6149.0 6161.0 6169.0 6180.0 6196.5 6218.0 6236.5 6250.5 6267.5 6275.5 6280.5 6290.0 6298.0 6323.0 6328.5 6336.5 6342.0 6359.5 6363.0 6369.0 6447.5 6458.5 6465.0 6470.0 6474.5 6487.5 6494.5 6500.5 6507.5 6511.0 6523.0 6532.0 6540.0 6560.0 6570.5 6578.0 6588.5 6594.5 6636.5 6645.0 6647.5 6655.0 6660.5 6686.5 6699.0 6715.5 MPH17007182007SSN.txt Page 5 ~ • 6733.5 6752.0 6753.5 6760.5 6765.5 6907.0 6991.5 7010.5 7033.0 7037.0 7039.5 7051.0 7074.5 7078.0 7086.5 7110.5 7123.0 7135.5 7145.5 7151.5 7185.0 7195.5 7207.0 7210.0 12562.0 $ 6728.0 6746.0 6747.0 6752.5 6758.0 6899.0 6983.5 7001.5 7023.0 7027.0 7029.5 7041.5 7065.5 7069.5 7079.0 7098.5 7111.0 7123.5 7134.5 7138.5 7173.5 7184.5 7195.5 7198.5 12550.0 # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MWD 2 MWD 3 MWD 4 $ # REMARKS: MERGED MAIN PASS. $ MPH17007182007SSN.txt MERGE TOP MERGE BASE 167.0 4810.0 4810.0 8700.0 8700.0 12550.0 # ~ata Format specification Record Data Record Type... ..........0 ~ata Specification Block Type.....0 Log~ing Direction .................DOwn optical log depth units...........Feet ~ata Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. . .. .. ..... ~atum specification Block sub-type...0 ~ Name Service Order units size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD CNTS 4 1 68 4 2 NCNT MWD CNTS 4 1 68 8 3 RHOB MWD G/CM 4 1 68 12 4 DRHO MWD G/CM 4 1 68 16 5 RPD MWD OHMM 4 1 68 20 6 RPM MWD OHMM 4 1 68 24 7 RPS MWD OHMM 4 1 68 28 8 RPX MWD OHMM 4 1 68 32 9 FET MWD HOUR 4 1 68 36 10 GR MWD API 4 1 68 40 11 PEF MWD BARN 4 1 68 44 12 ROP MWD FT/H 4 1 68 48 13 Page 6 ~ ~ MPH17007182007SSN.tXt NPHI MWD PU-S 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 172.5 12562 6367.25 24780 172.5 12562 FCNT MwD CNTS 135.87 2645.72 559.834 15356 4790 12467.5 NCNT MWD CNTS 14295.4 176608 72619.6 15356 4790 12467.5 RHOB MwD G/CM 0.038 3.371 2.2257 15387 4790 12483 DRHO MWD G/CM -4.34 0.803 0.0154278 15387 4790 12483 RPD Mw~ OHMM 0.06 2000 51.5539 24662 181 12511.5 RPM Mw~ OHMM 0.15 2000 47.2523 24662 181 12511.5 RPS MwD OHMM 0.11 2000 31.0239 24662 181 12511.5 RPx Mw~ OHMM 0.13 1873.94 20.2147 24662 181 12511.5 FET MwD HOUR 0.2 78.92 1.58928 24534 245 12511.5 GR MwD API 11.53 128.96 72.4573 24665 172.5 12504.5 PEF MwD BARN 1.01 12.99 2.32392 15387 4790 12483 ROP MwD FT/H 0.22 1073.42 165.899 24635 245 12562 NPHI MwD Pu-S 13.85 85.02 35.6387 15356 4790 12467.5 First Reading For Entire File..........172.5 ~ast Reading For Entire File...........12562 File Trailer Service name... .......STSLIB.001 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/12/10 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.002 Physical EOF File Header Service name... .......STSLIB.002 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/12/10 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.001 comment ttecord FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 167.0 RPD 175.5 RPS 175.5 RPM 175.5 RPx 175.5 STOP DEPTH 4754.5 4746.5 4746.5 4746.5 4746.5 Page 7 • ~ MPH1700718200755N.tXt ROP 239.5 4810.0 FET 239.5 4746.5 $ # LOG HEADER DATA DATE LOGGED: 05-JUL-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 4810.0 TOP LOG INTERVAL (FT): 239.0 BOTTOM LOG INTERVAL (FT): 4810.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 1.4 MAXIMUM ANGLE: 64.6 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 230386 EWR4 ELECTROMAG. RESIS. 4 116184 $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 12.250 DRILLER'S CASING DEPTH (FT): .O # BOREHOLE CONDITIONS MUD TYPE: Native/Spud Mud MUD DENSITY (LB/G): 9.70 MUD VISCOSITY (5): 125.0 MUD PH: 7.0 MUD CHLORIDES (PPM): 600 FLUID LOSS (C3): 8.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 5.800 48.0 MUD AT MAX CIRCULATING TERMPERATURE: 3.250 91.0 MUD FILTRATE AT MT: 4.900 48.0 MUD CAKE AT MT: 5.000 48.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type... .......... 0 Data Specification Block Type..... 0 Log~iny Direction ................. DOwn optical log depth units........... Feet ~ata Reference Point .............. undefined Frame Spacing....... ............ 60 .lIN Max frames per record ............. undefined ,4bsent value ...................... -999 Depth units ......... .. ... ..... ~atum specification Block sub-type ...0 Page 8 ~ MPH17007182007SSN.tXt C~ -vame service order units size Nsam Rep code offset Channel DEPT FT 4 1 68 0 1 RPD MWD020 OHMM 4 1 68 4 2 RPM MWD020 OHMM 4 1 68 8 3 RPS MWD020 OHMM 4 1 68 12 4 RPX MWD020 OHMM 4 1 68 16 5 FET MWD020 HOUR 4 1 68 20 6 GR MWD020 API 4 1 68 24 7 ROP MWD020 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 167 4810 2488.5 9287 167 4810 RPD MWD020 OHMM 0.06 2000 73.8172 9143 175.5 4746.5 RPM MWD020 OHMM 0.15 2000 83.6539 9143 175.5 4746.5 RPS MWD020 OHMM 0.11 2000 49.1338 9143 175.5 4746.5 RPx MWD020 OHMM 0.29 1388.05 28.1468 9143 175.5 4746.5 FET MwD020 HOUR 0.22 4.21 0.840461 9015 239.5 4746.5 GR MWD020 API 11.53 120.64 68.5984 9176 167 4754.5 ROP MwD020 FT/H 0.67 387.46 166.458 9142 239.5 4810 First Reading For Entire File..........167 ~ast rteading For Entire File...........4810 File Trailer Service name... .......STSLIB.002 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/12/10 Maximum Physical Record..65535 File Ty e ................LO Next Fi~e Name...........STSLIB.003 Physical EOF File Header Service name... .......STSLIB.003 Service Sub Level Name... version -vumber. ........1.0.0 ~ate of Generation.......07/12/10 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FCNT 4707.0 8609.0 NPHI 4707.0 8609.0 Page 9 • • MPH17007182007SSN.tXt NCNT 4707.0 8609.0 PEF 4719.5 8622.5 RHOB 4719.5 8622.5 DRHO 4719.5 8622.5 FET 4747.0 8646.5 RPX 4747.0 8646.5 RPS 4747.0 8646.5 RPM 4747.0 8646.5 RPD 4747.0 8646.5 GR 4755.0 8654.0 ROP 4810.5 8700.0 $ # LOG HEADER DATA DATE LOGGED: 11-JUL-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 72.13 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 8700.0 TOP LOG INTERVAL (FT): 4810.0 BOTTOM LOG INTERVAL (FT): 8700.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 60.4 MAXIMUM ANGLE: 89.3 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 97054 EWR4 ELECTROMAG. RESIS. 4 228269 CTN COMP THERMAL NEUTRON 231174 ALD Azimuthal Litho-Dens 186328 $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLER'S CASING DEPTH (FT): 4799.0 # BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB/G): 9.20 MUD VISCOSITY (S): 52.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 200 FLUID LOSS (C3): 7.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 5.500 56.0 MUD AT MAX CIRCULATING TERM PERATURE: 3.120 104.0 MUD FILTRATE AT MT: 3.400 56.0 MUD CAKE AT MT: 3.800 56.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Page 10 ~ ~ MPH17007182007SSN.tXt ~ata Format specification rtecord Data Record Type... ..........0 ~ata specification Block Type.....0 Log~iny DireCtion .................Down Optical log depth units...........Feet ~ata Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined ,4bsent value ......................-999 Depth units. . .. .. ..... ~atum Specification Block sub-type...0 Name service order units size Nsam Rep code offset Channel DEPT FT 4 1 68 0 1 FCNT MWD030 CNTS 4 1 68 4 2 NCNT MWD030 CNTS 4 1 68 8 3 RHOB MWD030 G/CM 4 1 68 12 4 DRHO MWD030 G/CM 4 1 68 16 5 RPD MWD030 OHMM 4 1 68 20 6 RPM MWD030 OHMM 4 1 68 24 7 RPS MWD030 OHMM 4 1 68 28 8 RPX MWD030 OHMM 4 1 68 32 9 FET MWD030 HOUR 4 1 68 36 10 GR MWD030 API 4 1 68 40 11 PEF MWD030 BARN 4 1 68 44 12 ROP MWD030 FT/H 4 1 68 48 13 NPHI MWD030 PU-5 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4707 8700 6703.5 7987 4707 8700 FCNT MWD030 CNTS 438.98 2645.72 857.188 7805 4707 8609 NCNT MWD030 CNTS 98781.3 176608 125577 7805 4707 8609 RHOB Mw~030 G/CM 0.259 2.809 2.20242 7807 4719.5 8622.5 DRHO MWD030 G/CM -4.308 0.327 0.00245677 7807 4719.5 8622.5 RPD Mw~030 OHMM 1.89 2000 37.267 7800 4747 8646.5 RPM MWD030 OHMM 1.9 1580.56 14.9707 7800 4747 8646.5 RPS MwD030 OHMM 1.9 1036.19 12.2889 7800 4747 8646.5 RPx MWD030 OHMM 1.91 847.62 11.1542 7800 4747 8646.5 FET MwD030 HOUR 0.2 70.82 2.09442 7800 4747 8646.5 GR MWD030 API 20.27 125.04 67.9381 7799 4755 8654 PEF MwD030 BARN 1.19 12.58 2.60448 7807 4719.5 8622.5 RoP Mw~030 FT/H 0.22 544.2 159.263 7780 4810.5 8700 NPHI MwD030 Pu-S 14.54 85.02 36.4675 7805 4707 8609 First Reading For Entire File..........4707 ~ast Reading For Entire File...........8700 File Trailer Service name... .......STSLIB.003 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/12/10 Maximum Physical rtecord..65535 File TyPe ................LO Next F~le Name...........ST5LI6.004 Page 11 C~ Physical EoF MPH17007182007SSN.tXt File Header Service name... .......STSLIB.004 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/12/10 Maximum Physical rtecord..65535 File Type. ............LO Previous File Name.......5T5LIB.003 Comment Record FILE HEADER • FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH NCNT 8609.5 12455.5 NPHI 8609.5 12455.5 FCNT 8609.5 12455.5 DRHO 8623.0 12471.0 PEF 8623.0 12471.0 RHOB 8623.0 12471.0 RPM 8647.0 12499.5 RPx 8647.0 12499.5 RPD 8647.0 12499.5 FET 8647.0 12499.5 RPS 8647.0 12499.5 GR 8654.5 12492.5 ROP 8700.5 12550.0 $ # LOG HEADER DATA DATE LOGGED: 18-JUL-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 72.13 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 12550.0 TOP LOG INTERVAL (FT): 8700.0 BOTTOM LOG INTERVAL (FT): 12550.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 85.9 MAXIMUM ANGLE: 94.5 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 184054 CTN COMP THERMAL NEUTRON 1844674407370955 EWR4 Electromag Resis. 4 148579 ALD Azimuthal L itho-Dens 10508942 $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.125 DRILLER'S CASING DEPTH (FT): 8693.0 # BOREHOLE CONDITIONS Page 12 • . # # # MPH17007182007SSN.tXt MUD TYPE: Fresh Water Gel MUD DENSITY (LB/G): 9.20 MUD VISCOSITY (S): 50.0 MUD PH: 9,Q MUD CHLORIDES (PPM): 77000 FLUID LOSS (C3): 5.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .070 47.0 MUD AT MAX CIRCULATING TERMPERATURE: .040 89.6 MUD FILTRATE AT MT: .180 47.0 MUD CAKE AT MT: .090 47.0 NEUTRON TOOL MATRIX: MATRIX DENSITY; HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: # Data Format Specification Record Ddtd Record Type... ..........0 ~ata Specification Block Type.....0 Log~ing Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined absent value ......................-999 Depth units. . .. .. ..... ~atum specification Block sub-type...0 Name service order units size Nsam rtep Code offset Channel DEPT FT 4 1 68 0 1 FCNT MWD040 CNTS 4 1 68 4 2 NCNT MWD040 CNTS 4 1 68 8 3 RHOB MWD040 G/CM 4 1 68 12 4 DRHO MWD040 G/CM 4 1 68 16 5 RPD MWD040 OHMM 4 1 68 20 6 RPM MWD040 OHMM 4 1 68 24 7 RPS MWD040 OHMM 4 1 68 28 8 RPX MWD040 OHMM 4 1 68 32 9 FET MWD040 HOUR 4 1 68 36 10 GR MWD040 API 4 1 68 40 11 PEF MWD040 BARN 4 1 68 44 12 ROP MWD040 FT/H 4 1 68 48 13 NPHI MWD040 PU-S 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 8609.5 12550 10579.8 7882 8609.5 12550 FCNT MWD040 CNTS 135.87 12 69.42 258.967 7693 8609.5 12455.5 NCNT MWD040 CNTS 14295.4 38 398.4 19603.7 7693 8609.5 12455.5 RHOB Mw~040 G/CM 0.038 3.371 2.23264 7697 8623 12471 DRHO MWD040 G/CM -4.34 0.803 0 .00556425 7697 8623 12471 RPD MwD040 OHMM 2.66 2000 40.0887 7706 8647 12499.5 RPM MWD040 OHMM 0.35 2000 36.6253 7706 8647 12499.5 RPS MwD040 OHMM 0.15 2000 28.493 7706 8647 12499.5 Page 13 ~ MPH17007182007SSN.tXt C~ rtPx MWD040 OHMM 0.13 1873.94 19.9543 7706 8647 12499.5 FET MwD040 HOUR 0.25 78.92 1.97181 7706 8647 12499.5 GR MwD040 API 45.06 128.96 81.7445 7677 8654.5 12492.5 PEF MwD040 BARN 1.01 12.99 2.1678 7697 8623 12471 ROP MwD040 FT/H 0.62 1073.42 171.864 7700 8700.5 12550 NPHI MwD040 Pu-5 13.85 44.03 35.1402 7693 8609.5 12455.5 First tteading For Entire File..........8609.5 ~ast Reading For Entire File...........12550 File Trailer Service name... .......STSLIB.004 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/12/10 Maximum Physical Record..65535 File Ty e ................LO NeXt F1~2 NaR1e...........STSLIB.005 Physical EOF Tape Trailer 521'ViCe name .............LISTPE Date . ...................07/12/10 origin ...................STS Tape Name. .... ........UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Reel Trailer Service name .............LISTPE Ddte . ...................07/12/10 Ori in ...................STS R2e~ Name. .... ........UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Writing Physical EoF Phy5iCd1 EOF End Of LIS File ~ibrary. Scientific Technical Services ~ibrary. scientific Technical Services Page 14