Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
167-035
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Tuesday, September 12, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Sully Sullivan P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp Alaska, LLC A44-11 MGS A44-11 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 09/12/2023 A44-11 50-733-20027-00-00 167-035-0 N SPT 2960 1670350 1500 200 200 200 200 44 47 47 47 OTHER P Sully Sullivan 7/18/2023 Pre injection MIT to start disposal operations from tank cleaning. Last MIT was 2014. tested to 1700 psi for buffer 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:MGS A44-11 Inspection Date: Tubing OA Packer Depth 77 1701 1675 1669IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSTS230724134752 BBL Pumped:0.5 BBL Returned:0.3 Tuesday, September 12, 2023 Page 1 of 1 1 Regg, James B (OGC) From:Regg, James B (OGC) Sent:Monday, July 10, 2023 3:03 PM To:bphillips@hilcorp.com Subject:RE: AOGCC Test Witness Notification Request: MIT, MGS - Platform A As discussed this afternoon, injection can commence when ready based on the self‐test result. AOGCC will be in touch regarding a witnessed MIT. Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907‐793‐1236 From: Regg, James B (OGC) Sent: Monday, July 10, 2023 12:56 PM To: bphillips@hilcorp.com Subject: RE: AOGCC Test Witness Notification Request: MIT, MGS ‐ Platform A Barney – We do not have an Inspector available tomorrow to witness the MIT; can this be rescheduled? Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907‐793‐1236 From: Jotform <noreply@jotform.com> Sent: Friday, July 7, 2023 8:43 AM To: DOA AOGCC Prudhoe Bay <doa.aogcc.prudhoe.bay@alaska.gov>; ced‐svc‐ogcforms (CED sponsored) <ced‐ogc‐ jotforms@alaska.gov> Subject: AOGCC Test Witness Notification Request: MIT, MGS ‐ Platform A Question Answer Type of Test Requested: MIT Requested Time for Inspection 07‐11‐2023 8:00 AM CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. Middle Ground Shoal MA44-11PTD 1670350 2 Location MGS ‐ Platform A Name Barney Phillips E‐mail bphillips@hilcorp.com Phone Number (907) 394‐2454 Company Hilcorp Other Information: Requesting Inspector Witness for MIT on disposal well A44‐11 on Platform A. Submission ID: 5645573741312181072 1 Regg, James B (OGC) From:Josh Allely - (C) <Josh.Allely@hilcorp.com> Sent:Friday, July 7, 2023 3:30 PM To:Regg, James B (OGC); McLellan, Bryan J (OGC); Wallace, Chris D (OGC) Cc:Barney Phillips; Ryan Rupert Subject:FW: [EXTERNAL] AOGCC Inspection Form Confirmation Email - MGS Platform A - Well A44-11 Attachments:MGS A44-11 - MIT Form.xlsx; A44-11 Current WBD 7-7-99.pdf Hello This request is for an MIT on MGS A44‐11 (PTD 167‐035). MGS A44‐11 is a Class 2 disposal well authorized under AIO 9.The last AOGCC witnessed MIT on this well occurred on 7/19/14. No further MIT’s were conducted due to the well’s inactivity. The platform is planning to use the well to dispose of waste generated from flushing the production lines with filtered inlet water. We recently (6/27/23) performed a MIT pre‐test to ensure the IA is liquid packed and has integrity. The results of the pre‐test are attached for reference. Also attached is the current well bore schematic. Operations may begin as soon as 7/13/23, so we would like to get the AOGCC witnessed test completed on 7/11 (see witness request below). Barney Phillips (907‐394‐2454) will be coordinating the test and is the primary contact for the operation. Please let me know if you have any questions. Thanks Josh Josh Allely Well Integrity Engineer Kenai – Hilcorp Alaska 907-777-8505 From: Jotform <noreply@jotform.com> Sent: Friday, July 7, 2023 8:43 AM To: Barney Phillips <bphillips@hilcorp.com> Subject: [EXTERNAL] AOGCC Inspection Form Confirmation Email CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders. Middle Ground Shoal A44-11PTD 1670350 2 This email confirms your request for an inspection with the following information: Type of Test Requested: MIT Requested Time for Inspection: 07‐11‐2023 8:00 AM Location: MGS ‐ Platform A Name: Barney Phillips E‐mail: bphillips@hilcorp.com Phone Number: (907) 394‐2454 Company: Hilcorp Other Information: Requesting Inspector Witness for MIT on disposal well A44‐11 on Platform A. If you are not contacted within 12 hours, please notify Jim Regg at 907‐793‐1236. Thank you! Alaska Oil and Gas Conservation Commission The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Submit to: OPERATOR: FIELD / UNIT / PAD: DATE: OPERATOR REP: AOGCC REP: Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD 1670350 Type Inj N Tubing 0 0 0 0 0 0 Type Test P Packer TVD 2960 BBL Pump 0.5 IA 43 1670 1649 1641 1637 1634 Interval O Test psi 1500 BBL Return 0.4 OA 42 43 45 45 45 45 Result P Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result TYPE INJ Codes TYPE TEST Codes INTERVAL Codes Result Codes W = Water P = Pressure Test I = Initial Test P = Pass G = Gas O = Other (describe in Notes)4 = Four Year Cycle F = Fail S = Slurry V = Required by Variance I = Inconclusive I = Industrial Wastewater O = Other (describe in notes) N = Not Injecting Notes: Hilcorp Alaska LLC Middle Ground Shoal Field / A platform B.Phillips / R. Paulk / D. Zulkanycz 06/27/23 Notes:Pre Injection MIT prior to resuming disposal operations. Last MIT performed was in 2014. Notes: Notes: Notes: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test jim.regg@alaska.gov;AOGCC.Inspectors@alaska.gov;phoebe.brooks@alaska.gov chris.wallace@alaska.gov Notes: Notes: Notes: Form 10-426 (Revised 01/2017)2023-0627_MIT_MGS_A44-11 Monthly table and plot of TIO pressures provided to AOGCC for review during LTSI period -- jbr, 7/10/2023 J. Regg; 7/10/2023 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim ReggDATE: Thursday, July 31, 2014 y� 1 �lv/ l P.I. Supervisor ! SUBJECT: Mechanical Integrity Tests XTO ENERGY INC A44-11 FROM: Bob Noble MGS A44-11 Petroleum Inspector Sre: Inspector Reviewed By: P.I. Suprv- NON-CONFIDENTIAL Comm Well Name MGS A44-11 API Well Number 50-733-20027-00-00 Inspector Name: Bob Noble Permit Number: 167-035-0 Inspection Date: 7/19/2014 Insp Num: mitRCN140720080247 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min ell A44-11 Type Inj N TVD 2960 Tubing zoo 200 - - 200 200 PTD 1670350 Type Test SPT Test psi 1500 1A 31 1652 - 1633 1626 Illtervall4YRTST P�1 P OA 2 4 4 4' Notes: SCM14ED OCT 3 02014 Thursday, July 31, 2014 Page I of I • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, May 12, 2010 To: Jim Regg ~ ~~~g~,© P.I. Supervisor (~ SUBJECT: Mechanical Integrity Tests ( XTO ENERGY INC A44-11 FROM: Chuck Scheve MGS Aaa-11 Petroleum Inspector Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv ~~~ Comm Well Name: MGS A44-11 Insp Num: mitCS100508074358 Rel Insp Num: API Well Number: 50-733-20027-00-00 Permit Number: 167-035-0 Inspector Name: Chuck Scheve Inspection Date: 5/3/2010 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well A4a-11 Type Inj. N 'I'~ID 2960 IA 0 1675 / 1700 1700 / P.T.D 1670350 TypeTest sPT Test psi 1500 '~ QA 10 12 12 12 Interval avxTST p~ P ~ Tubing loo ]oo ]oo ]oo Notes: ~ ~ "` l i`i Wednesday, May 12, 2010 Page 1 of 1 • • Apri128, 2009 Alaska Oil and Gas Conservation Commission Attn: Mr. John Norman 333 West 7~' Ave., Suite 100 Anchorage, Alaska 99501 ~~ A~'Clrur~~;,~ ~TO ENERGY XTO Energy Inc. 200 North Loraine Suite 800 Midland, Texas 79701 432-682-8873 432-687-0862 (Fax) s'; ~rity~%A'~~~ q ~-~} ~ ~' V` I RE: Sundry Well Operations Report: Well #A44-11 Conductor Repair Dear Mr. Norman, XTO Energy, Inc. hereby submits its Sundry Operations Report (Form 10-404) for the conductor and surface casing repair performed on the well #A44-11. This well is located on Platform A, in the Middle Ground Shoal Field of Cook Inlet, AK. Please find attached the following information for your files: 1. Form 10-404 Report of Sundry Well Operations ~- 2. Summary of Repairs ` ''~'~" "~~~" j ! '~~ ~~` .~ . ' ~~'~ 3. Ultrasonic Thickness Inspectors Report 4. Before and After Photographs of Surface Casing If you have any questions or require additional information, please contact me at (432) 620-6742. Sincerely, Jeff Gasch Production Engineer Cc: Scott Griffith Paul Figel I, , ' STATE OF ALASKA ~~~ ~~ ~. ALAS~ILAND GAS CONSERVATION COMMI~N '" ,~~~T,~~9 REPORT OF SUNDRY WELL OPERATIOI~~ ~ ~~> ` r ~~~~1 1. Operations Abandon Repair Well Plug Perforations Stimulate ti~,w 1~ . IrCanductor Performed: Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver^ Ti4~i+Qq~n ^ Change Approved Program ^ Operat. Shutdown ^ Perforate ^ Re-enter Suspended Well ^ '` ~'` - :i 2. Operator XTO Energy Inc 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development ^ Exploratory^ 167-035 ' /~ 3. Address: 200 N Loraine, Suite 800 Midland, TX 79701 Stratigraphic ^ Service ^~ 6. API Number: 50-733-20027-0p~0 7. KB Elevation (ft): 9. Well Name and Number: 38' MGS A44-11 j 8. Property Designation: 10. Field/Pool(s): ADL 18754 ~ Middle Ground Shoal/No Pool Designation 11. Present Well Condition Summary: Total Depth measured 9260 feet Plugs (measured) true vertical 8931 feet Junk (measured) Effective Depth measured 5350 feet true vertical 5338 feet Casing Length Size MD TVD Burst Collapse Structural Conductor Surface 1912 10-3/4" 1912 1911 3130 1580 Intermediate Production 9211 7" 9211 8883 7240 5410 Liner Perforation depth: Measured depth: 4938-5300' True vertical depth: 4933-4986' Tubing: (size, grade, and measured depth) 3-1/2", 9.3# N80, 8RD EUE @ 0-3037' Packers and SSSV (type and measured depth) Baker SAB-3 Packer @ 2962' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 50 100 Subsequent to operation: 0 0 0 50 100 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development ^ Service ^~ Daily Report of Well Operations X 16. Well Status after work: Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL ^~ ` 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Jeff Gasch Printed Name Jeff Gasch Title Production Engineer Signature Phone (432) 620-6742 Date 4/28/2009 Form 100+3 Revised 04/2006 ~ .~,A ~ 5~r`~ e') ~ • (~ R Submit Original Only ~3 ~,v • • 2 A44-11 Summary of Repairs 8/15/08 -Chip grout out of surface casing x conductor annulus down 2' and found corrosion on surface casing. There was no grout in the annulus down to 35'. Found two holes in surface casing. One hole is 8" below tree and is approximately 3" x 5" in size. Second hole is 27" below tree and 3/" diameter. 8/19/08 -Cut window in conductor 1' off floor in Bay 5 to let water out and inspect surface casing. Ultrasonic inspection of surface casing shows corrosion limited to top of casing near the top of water level in the annulus. 3/14/09 -Weld 10"x18" patch over 3"x5" hole in surface casing. 3/15/09 -Weld 18"x10X patch over 3/" diameter hole in surface casing. Install A+ wrap over repair areas. 4/12/09 -Refill annulus w/ grout and patch conductor. Weld seal plate over top of conductor. ///% ACUREN January 5, 2009 Subject: XTO A Platform Conductor Inspections Conductor A44-11 Inspection Summary • Acuren USA Inc. 7911 King Street Anchorage, AK 99518 Phone: (907}569-5000 Fax: (907) 569-5005 Materials lnyineaie+q and Testieg a Rockwood Company In June, 2008 during conductor inspections requested by XTO Energy, I performed visual and ultrasonic examinations on the 24" A44-11 conductor. There was notable sign general internal pitting corrosion found during an ultrasonic corrosion scan and two small holes caused by the internal corrosion located 15"below the top of the conductor. For further investigation showed the internal corrosion to the conductor extending 36" down from the top of the conductor. 24" inches of grout was removed from the conductor in order to inspect the encased 10" Surface Casing. Once the casing was exposed it was evident there are two through-holes on the casing caused by external corrosion. Ultrasonic testing was conducted on the 10" casing and the extent of the corrosion was determined. April 24, 2009 Final Repairs Two patches were installed after receiving permission from the State on March 14 & 15, 2009. Patch #1 is 10"L X 18"W and Patch #2 is 18"L X 10"W. Certified pipe wrap product A+ Wrap was installed over the repair areas. The void between the Casing and Surface casing was filled with grout on April 12, 2009. Steel seal plates were added as the final step in order to seal the conductor and prevent ingress of corrosives. Morgan Evans QC~ AWS/APUNACE Inspector Acuren USA go~K F' ~~ o3o~to~t Kenai, Alaska ~ ^ tntegrfty monogement solutions III 997/t ''"°'~J „Q + oys~-~o7 „S xii ~ r`'q'''S'tl'~o7 t?i+~i~ s~,o.}i ~ o ~b {f l 1'h4t {~ ~.. ~. .~ r. ^.,, I~ i a. -.. ~~ ~ ~ I ~~ S ~. ' fi;~ ~y r..arr _ t.t',,. ~ ..t_ ~_ 1~r~ . ~ pt f' ^'~C ~. s~.'_ -~ : _ ,,.r l~ ~ ~-~ F 'f.< ,t ~, yam~: y,~y,,. • • XTO "A" Platform Well 44-11 Final Repair -~ . S~R~~4LE GAs~~JG PRT~ ~ wE~.~~r.~ oV6 R 31y," Ho,.E . ,~. _ `.~` SUt~FAGb eAs,n~~, r PSYCH we~~~ ~~ ~~ _. ~" -, .. ~ ~. r _ ~:z.. .. .~ ~~ ~` a ,4~ ;~r' ~_ V «. J a. a ~- sc -t. a- ~-- Q. c SUP,FRGC GAS~N6 X Coa~D~~'t'~R P~NNUI-d5 F~~-~-6-~ t~/ (jrQ,D~T 1, ~, r ~` a~ - ~ .r - f M ~~_ :~'~r~- ^~a ~'"4 ~"' ti _,. A4~-il SEf~L P~.~rb c~~-~~~a Tb co~o~~T~2 ~, - J .~°~ ~ -~ ~. ~~ -~ ,, . ~ ~~ ~\ .~ -. . ~, ~: Myxyr. t/" :. ._;,~~~ ., '~. .. ~'~ ~.:~ e . r_ • • Regg, James B (DOA) From: Steve_Phipps@xtoenergy.com Sent: Tuesday, April 14, 2009 2:07 PM ~ ~~~~~' Z~~,' To: Regg, James B (DOA) ~~~~~~ Cc: AlaskaMgmt@xtoenergy.com; Shane_Alexander@xtoenergy.com; Jeff_Gasch@xtoenergy.com Subject: Fw: A44-11 pics after filling with concrete Attachments: 100_0497.jpg; 100_0493.jpg; 100_0494.jpg; 100_0495.jpg; 100_0496.jpg t~ ~ ~ ~ ~ ~ i ~~ -~ ~ 35 100_0497.jpg (1 100_0493.jpg(959 100_0494.jpg (1 100_0495.jpg (994 100_0496.jpg (952 MB) KB) MB) KB) KB) Jim these are pictures of our 44-11 conductor after cementing. We are currently installing a seal plate like we used on our other wells. Steve Phipps ~ ~~~~ ~ ~~ ~~~ ZC1~~j Operations Supervisor XTO Energy, Inc. 52260 Wik Road Kenai, AK 99611 907-398-6474 ----- Forwarded by Steve Phipps/KEN/CTOC on 04/14/2009 01:45 PM ----- Nick Stoltzfus/KEN/CTO C 04/12/2009 04:29 PM Steve Phipps/KEN/CTOC@CTOC A44-11 pics To CC Subject ~~'~ APB ~ ,~ 2~C (See attached file: 100 0497.jpg)(See attached file: 100_0493.jpg)(See attached file: 100_ 0494.jpg)(See attached file: 100_0495.jpg)(See attached file: 100_0496.jpg) 1 Regg, James B (DOA) From: Steve_Phipps@xtoenergy.com ;~ Sent: Friday, March 27, 2009 11:18 AM `\~~~ ~~ ~ To: Regg, James B (DOA) 1 Cc: AlaskaMgmt@xtoenergy.com; Shane_Alexander@xtoenergy.com; Jeff_Gasch@xtoenergy.com Subject: 44-11 completed wrap Attachments: A44-11 Completed Wrap 4.JPG; A44-11 Completed Wrap 1.JPG; A44-11 Completed Wrap 2.JPG; A44-11 Completed Wrap 3.JPG _,.~ ~ }_ A44-11 Completed A44-11 Completed A44-11 Completed A44-11 Completed p~e)~c,s ~1 Z6 w~. Wrap 4.JPG (2... Wrap 1.]PG (2... Wrap 2.JPG (2... Wrap 3.JPG (3... i f 1 Jim these are the completed pictures of the surface casing wrap on 44-11 on Platform A. If these meet with your approval we will we d the conductor back together. Then fill the area between the surface casing and the conductor with concrete. Thanks. (See attached file: A44-11 Completed Wrap 4.JPG)(See attached file: A44-11 Completed Wrap l.JPG)(See attached file: A44-11 Completed Wrap 2.JPG)(See attached file: A44-11 Completed Wrap 3.JPG) Steve Phipps Operations Supervisor XTO Energy, Inc. 52260 Wik Road Kenai, AK 99611 907-398-6474 1 • Regg, James B (DOQ) From: Steve_Phipps@xtoenergy.com c Sent: Friday, March 27, 2009 10:59 AM ~~1 ~' l~ `~ To: Regg, James B (DOA) 1 Cc: AlaskaMgmt@xtoenergy.com; Shane_Alexander@xtoenergy.cor~; Jeff_Gasch@xtoenergy.com Subject: Fw: A 44-11 wrap in progress Attachments: A 44-11 006.jpg; A 44-11 005.jpg; A 44-11 004.jpg; A 44-11 003.jpg; A 44-11 002.jpg; A 44-11 001.jpg L. ~I ` l~l ' L. J ~ l.r~i A 44-i1 006.jpg (1 A 44-11 005.jpg (1 A 44-11 004.jpg (1 A 44-11 003.jpg (1 A 44-1i 002.jpg A 44-i1 OOi.jpg MB) MB) MB) MB) (965 KB) (928 KB) Jim these are pictures of the wrapping process on surface casing of 44-11 on Platform A. Steve Phipps Operations Supervisor XTO Energy, Inc. 52260 Wik Road Kenai, AK 99611 907-398-6474 ----- Forwarded by Steve Phipps/KEN/CTOC on 03/27/2009 10:52 AM ----- Robert Wolfe/KEN/CTOC To 03/26/2009 04:34 Steve Phipps/KEN/CTOC@CTOC PM cc A 44-11 wrap Subject (See attached file: A 44-11 006.jpg)(See attached file: A 44-11 005.jpg) (See attached file: A 44-11 004.jpg)(See attached file: A 44-11 003.jpg) (See attached file: A 44-11 002.jpg)(See attached file: A 44-11 OOl.jpg) 1 • Regg, James B (DOA) From: Steve_Phipps@xtoenergy.com ~, ( ~~ Sent: Friday, March 27, 2009 10:52 AM \/ To: Regg, James B (DOA) Cc: AlaskaMgmt@xtoenergy.com; Shane_Alexander@xtoenergy.com; Jeff_Gasch@xtoenergy.com Subject: Fw: A44-11 surface casing patches Attachments: A44-11 008.jpg; A44-11 007.jpg; A44-11 006.jpg; A44-11 005.jpg; A44-11 004.jpg; A44-11 003.jpg; A44-11 002.jpg; A44-11 001.jpg ~~ ~ IaW .Eat ~~~ d ICI A44-11 008.jpg (1 A44-11 007.jpg (1 A44-11 006.jpg A44-11 005.jpg A44-11 004.jpg A44-il 003.jpg A44-11 002.jpg MB) MB) (1,007 KB) (951 KB) (962 KB) (1,023 KB) (926 KB) A44-11 OOl.jpg (928 KB) Jim these are the pictures of the patches we welded on the surface casing of 44-11 on Platform A.. ~~~~~ ~ ~~~6) 2e~~g Steve Phipps Operations Supervisor XTO Energy, Inc. 52260 Wik Road Kenai, AK 99611 907-398-6474 ----- Forwarded by Steve Phipps/KEN/CTOC on 03/27/2009 10:24 AM ----- Robert Wolfe/KEN/CTOC To 03/16/2009 07:57 Steve Phipps/KEN/CTOC@CTOC AM cc A44-11 Subject (See attached file: A44-11 008.jpg)(See attached file: A44-11 007.jpg)(See attached file: A44-11 006.jpg)(See attached file: A44-11 005.jpg)(See attached file: A44-11 004.jpg)(See attached file: A44-11 003.jpg)(See attached file: A44-11 002.jpg) (See attached file: A44-11 OOl.jpg) 1 ~~~~~ 4 ~ r5 ~z.~;1 i MGS A44-ll (XTO Energy, I(nc) Surface Casing Repair PTD 167-035 Photos Courtesy of XTO 4/ 15/2009 Welded Surface Casing Patches - 3/16/2009 Window cut in conductor; welded surface casing patch Upper welded surface casing patch Another view of conductor window and welded surface casing patches • View of upper surface casing patch MGS A44-11 (PTD 167-03~Surface Casing Repair MGS A44-11 (PTD 167-035) Surface Casing Repair • View of surface casing from wellhead; patches prepped for wrap 3 MGS A44-11 (PTD 167-03•Surface Casing Repair • Installation of Casing Wrap - 3/26/2009 See http:;l~~w~~~.piperepair.net for details. XTO used a composite pipe wrap designed for specialized repair, reinforcement and corrosion control. Materials and procedures are consistent with ASME and ISO standards governing composite repair systems of piping. Surface casing patches covered with composite material pipe wrap; prior to sealing 4 • Views of surface casing patches from wellhead; prior to covering composite wrap MGS A44-1 l (PTD 167-035) Surface Casing Repair Completed patched, wrapped and sealed; prior to reinstalling conductor window, welding in place, and filling conductor by surface casing annulus with cement MGS A44-11 (PTD 167-035) Surface Casing Repair • MGS A44-11 (PTD 167-035) Surface Casing Repair Cementing Conductor by Surface Casin~7 Annulus - 4/12/2009 7 MGS A44-11 (PTD 167-035) Surface Casing Repair Page 1 of 2 Maunder, Thomas E (DOA) From: Jeff Gasch@xtoenergy.com Sent: Tuesday, February 24, 2009 11:43 AM To: Maunder, Thomas E (DOA) Cc: Regg, James B (DOA); Paul_Figel@xtoenergy.com Subject: RE: XTO Energy - Platform A Conductors Tom, The 10-404's for wells #6 & 7 in the list below (A31-14LW (194-044) &A32-11 R (193-092)) were sent via Fed-Ex yesterday. The only outstanding 404 is for the A44-11 (167-035). We will submit this sundry report when repairs are complete. The picture you refer to for the A11-12 was the only copy I had. I will check with our Alsaka personnel to see if they have a better quality image. Thanks, Jeff Gasch Production Engineer XTO Energy Office # (432) 620-6742 Cell # (432) 638-7433 Fax # (432) 687-0862 "Maunder, Thomas E (DOA)" <tom.maunder@alaska.gov> 02/23/2009 05:51 PM To Jeff_Gasch@xtoenergy.com cc ^Regg, James B (DOA)" <jim.regg@alaska.gov>, Paul_Figel@xtoenergy.com Subject RE: XTO Energy - Platform A Conductors Jeff, This message follows on our ongoing discussion regarding the repairs to conductor and in same cases surface casing an Platform A. We have received form 10-404s for first 4 wells listed below. You have indicated that well #5 will repaired soon. What are the plans far wells 6 and 7? Also in the submitted report far A11-12, the "small" drawing is rather dark. Do you have a better image? When the document is scanned, the poor image wilE essentially be totally dark. Thanks in advance. I look forward to your reply. Tom Maunder, PE AOGCC 1. A11-12 (166-044) -Ultrasonic Thickness (UT) showed hole in conductor 1.5" below top and other corrosion (0.160" wall thickness remaining) was noted. Corrosion limited to top of conductor. Grout/cement was chipped down to 20" to inspect surface casing. Plan to weld repair conductor and re-fill conductor with grout. 2. A11-13RD2 (181-060) - No visible exterior corrosion on conductor. Conductor UT readings showed corrosion 2/26/2009 • Page 2 of 2 limited to top of conductor with minimum reading of 0.300" thickness remaining. Grout/cement was chipped exposing an 8" band of corrosion ranging from 0.100" to 0.350" wall thickness remaining on the 10-3/4" surface casing (nominal wall thickness 0.350"). Plan to repair area of corrosion and re-fill annulus with grout. 3. A22-14LS (194-071) - No visible exterior corrosion on conductor. Conductor UT readings revealed corrosion (minimum of 0.300" wall thickness remaining) which is limited to the top of the conductor. Grout was chipped down 6" and surface casing is ready to UT test. If UT test is good then plan to re-grout surface csg x conductor annulus. 4. A42-14 (167-041) - No visible exterior corrosion on conductor. UT readings showed scattered corrosion near top with minimum wall thickness reading of 0.300". Grout was chipped to 10" depth. UT readings on the surface casing looked good with wall thickness readings ranging from 0.333"-0.350" (nominal wall thickness of 10-3/4" surface casing is 0.350"). Plan to re-fill with grout. 5. A44-11 (167-035) -Two holes found in conductor 15" from top and 7" apart. UT readings show that corrosion extends downward. At 36" from top minimum wall thickness is 0.100". Grout was chipped down and found small holes in surface csg. Chipped down another 2 feet and found a void in the surface casing x conductor annulus that extends down +/-35'. This void was filled w/ water. Cut window lower in conductor and drained water. Surface casing looks good at this depth. Plan to weld repair surface casing and fill conductor with grout to surface. 6. A31-14LW (194-044) - No visible exterior corrosion on conductor. Conductor UT readings showed scattered corrosion extending from top to 44" down. Drilled holes in the thin spots of the conductor and found 3-4' void full of water. Cut a 9" x 10" window in conductor approximately 54" from top. Surface casing looks good at this depth. Void extends to approximately 5-6' from top of conductor. Chipped grout from top of conductor and found 1-1/4" x 8" hole in surface casing at 20" from top. Cut window in conductor in-line with surface casing corrosion to get a better look at the corrosion and 7-5/8" intermediate casing. The 7-5/8" intermediate casing looks good. Surface casing corrosion appears to be limited to the top of the void area. Plan to repair surface casing by welding fabricated sleeve over area of corrosion then fill void with grout. 7. A32-11 R (193-092) - 3 small holes in conductor. UT readings showed corrosion limited to top 36" of conductor with 0.160" minimum wall thickness remaining. Chipped grout down from surface of conductor and found small holes through surface casing. Waiting on more UT numbers to determine extent of surface casing corrosion. Plan to find extent of corrosion, weld repair surface casing and re-fill annulus with grout. Page 1 of 1~ Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) , ~~ ,_'~~~ Sent: Monday, February 23, 2009 12:25 PM To: 'Jeff Gasch@xtoenergy.com' Cc: Regg, James B (DOA); Paul_Figel@xtoenergy.com Subject: RE: XTO Energy - Platform A Conductors Jeff that is correct. It is uncertain if anyone might be available, however the opportunity to witness should be given. As usual, a minimum of 24 hours notice is appreciated. Regardless of an Inspector attending or not, please obtain photos documenting the repair prior to refilling with grout. Call or message with any questions. Tom Maunder, PE AOGCC From: Jeff_Gasch@xtoenergy.com [mailto:Jeff_Gasch@xtoenergy.com] Sent: Monday, February 23, 2009 12:24 PM To: Maunder, Thomas E (DOA) Cc: Regg, James B (DOA); Paul_Figel@xtoenergy.com Subject: RE: XTO Energy - Platform A Conductors Thanks Tom. The way I understand this is that you would like to have an inspector view the repairs to the surface casing before we re-patch the conductor and re-fill it with grout. Is that correct? If so we will commence repairs and contact the inspectors at the appropriate time. Thanks for your help. Thanks, Jeff Gasch Production Engineer ~f'} ~ ~~ c;, ~~~; ~, XTO Energy ~~'~ .~~ ~~~ Office # (432) 620-6742 Cell # (432) 638-7433 Fax # (432) 687-0862 "Maunder, Thomas E (DOA)" <tom.maunder@alaska.gov> To Jeff_Gasch@xtoenergy.com cc "Regg, James B (DOA)" <jim.regg@alaska.gov>, Paul_Figel@xtoenergy.com 02/23/2009 03:09 PM Subject RE: XTO Energy - Platform A Conductors I have had an oppor k further at the trailing parts o essage. When you first notified us of the inspections and findings, it was de e ~ at sundries would not be needed but that the followup 404s should be filed. I have rec Ived a hia 4s for work on the other wells. That will be all that is necessary for A4 - ease be sure that notification is given o tors so that one might travel to the ble. Sorry far the confusion. CaPI or message with any questions. 2/23/2009 Page ~` of ~ ~ • a Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Monday, February 23, 2009 12:10 PM To: 'Jeff Gasch@xtoenergy.com' Cc: Regg, James B (DOA); Paul_Figel@xtoenergy.com Subject: RE: XTO Energy - Platform A Conductors Jeff, I have had an opportunity to look further at the trailing parts of your message. When you first notified us of the inspections and findings, it was determined at that time that sundries would not be needed but that the fallowup 404s should be filed. I have recently received a number of 404s for work on the other wells. That will be all that is necessary for A44-11. Please be sure that notification is given to the Inspectors so that one might travel to the platform if possible. Sorry for the confusion. Call or message with any questions. Tom Maunder, PE AOGCC From: Jeff_Gasch@xtoenergy.com [mailto:Jeff Gasch@xtoenergy.com] Sent: Monday, February 23, 2009 9:00 AM To: Maunder, Thomas E (DOA) Subject: Re: XTO Energy - Platform A Conductors Thanks Tom. I will submit the sundry ASAP. Jeff From: "Maunder, Thomas E (DOA)" [tom.maunder@alaska.gov] Sent: 02/23/2009 08:46 AM YST To: Jeff Gasch Ce: Scott Griffith; Greg Duggin; Cody Mishler; Steve Phipps; Paul Figel; "Regg, James B (DOA)" <j im. regg @alaska. gov> Subject: RE: XTO Energy - Platform A Conductors Jeff, These work requests should be submitted by sundry notice. Tom Maunder, PE AOGCC From: Jeff Gasch@xtoenergy.com [mailto:Jeff Gasch@xtoenergy.com] Sent: Monday, February 23, 2009 8:20 AM To: Maunder, Thomas E (DOA); Regg, James B (DOA) Cc: Scott Griffith@xtoenergy.com; Greg_Duggin@xtoenergy.com; Cody_Mishler@xtoenergy.com; Steve_Phipps@xtoenergy.com; Paul_Figel@xtoenergy.com Subject: RE: XTO Energy - Platform A Conductors 2/23/2009 Page ~ of 3 Tom, We have finalized plans for the repair of the A44-11 surface and conductor casings and would like to get your approval to proceed. Below is the inspection summary and proposed repair. I have attached photographs of the surface and conductor casings and the inspectors report. Steve Phipps has been supervising the repairs and the inspector can contact him to set up a time to go out to the platform. His numbers are 907-776-2560 (office) & 907-398-6474 (cell) and he is scheduled to be back on duty this Thursday. Please let me know if you have any questions. A44-11 Inspection Summary UT inspection of conductor reveled two small holes 15" from the top of the conductor. Internal corrosion of the conductor extends 36" down from top. Chipped 2' grout and found 35' void in surface casing x conductor casing annulus. Revealed a 3"x5" hole in surface casing down 8" from tree and a 3/" dia hole 27" down. Cut window in conductor casing on lower deck to inspect surface casing. Surface casing looks good. A44-11 Surface Casing Repair Weld 10"x18" patch over 3"x5" area of corrosion & holes Weld 12"x12" patch over 3/4" dia hole. UT inspection shows material surrounding patches is approximately 0.300" thick (10-3/4" 40.5# csg wall thickness is 0.350") Wrap surface casing with mechanically applied campsite product Weld patches to repair conductor casing. Refill surface casing x conductor casing annulus with grout Weld seal plate to conductor to prevent fluids from entering grout from surface. Thanks, Jeff Gasch Production Engineer XTO Energy Office # (432) 620-6742 Cell # (432) 638-7433 Fax # (432) 687-0862 "Maunder, Thomas E (DOA)" To Jeff_Gasch xtoener com <tom.maunder@alaska.gov> @ 9Y~ Scott_Griffith@xtoenergy.com, Paul_Figel@xtoenergy.com, DOA AOGCC cc 08/22/2008 01:45 PM Prudhoe Bay <doa.aogcc.prudhoe.bay@alaska.gov> Subject RE: XTO Energy - Platform A Conductors Jim Regg ve examined the information you have provided and it will no o submit sundries for the work. We will r message as equivalent n ~ are requested to submit 404 sundry reports for each well covering an or and the ultimate repair(s). In order to have a complete record of th e helpful if you cou ~ before and after photos that document the condition of 2/23/2009 Maunder, Thomas E (DOA) From: Jeff Gasch@xtoenergy.com Sent: Friday, August 22, 2008 3:45 PM To: Maunder, Thomas E (DOA) Page y'of ~ ~~ Cc: Scott_Griffith@xtoenergy.com; Paul_Figel@xtoenergy.com; DOA AOGCC Prudhoe Bay Subject: Re: XTO Energy - Platform A Conductors Thanks Tom. We'll file the 404's promptly upon completion of repairs. Regarding Platform C, we did the ultrasonic thickness inspection on all conductors (top to bottom) when the corrosion was discovered on A. There were no corrosion issues with any conductors on C. Thanks, Jeff Gasch Fr : "Maunder, Thomas E (DOA)" [tom.maunder@alaska.gov] Sent: 22/2008 10:45 AM PST To: Jeff ch Cc: Scott Grl th; Paul Figel; DOA AOGCC Prudhoe Bay <doa.aogcc.prudhoe.bay@alaska.gov> Subject: RE: X Energy - Platform A Conductors Jeff, Jim Regg and I have examine e information you have provided and it wilt not be ecessary to submit sundries for the work. We will treat your m sage as equivalent notificatian. You are re steel to submit 404 sundry reports for each well covering any ex ination work and the ultimate repairs . In order to have a complete record of the work, it would be helpful if u could submit before and after otos that document the condition of the surface casings. It appears that with th xception of A44-11 that a damages are "shallow". Prior to finalizing the repairs on A44-11, please have t latform contact th spectors so that one might travel to the platform and examine this well. l will place a cop f this messag n the various well files. We will look for the 404s documenting the repairs. A further question, has anything similar been noticed on a rm C? Call or message with any questions. Tom Maunder, PE AOGCC From: Jeff_Gasch@xtoenergy.com [mailto:J _Gasch@xtoenergy.com Sent: Thursday, August 21, 2008 7:49 A To: Maunder, Thomas E (DOA) Cc: Scott_Griffith@xtoenergy.com; ul_Figel@xtoenergy.com Subject: XTO Energy - Platfor Conductors Tom, Per our convey ion Tuesday and your request here is a summary of what we have found. We are unsu if we need to file undry notice to repair the surface casing. Please look this over at your earliest convenience let us know i e need to file a sundry. We would like to begin repairs ASAP. Please contact me with any question . 2/23/2009 • Page 1 of 2 Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Friday, August 22, 2008 10:45 AM To: 'Jeff_Gasch@xtoenergy.com' Cc: Scott Griffith@xtoenergy.com; Paul_Figel@xtoenergy.com; DOA AOGCC Prudhoe Bay Subject: RE: XTO Energy - Platform A Conductors Jeff, Jim Regg and 1 have examined the information you have provided and it will not be necessary to submit sundries for the work. We will treat your message as equivalent notification. You are requested to submit 404 sundry reports far each well covering any examination work and the ultirate repair(s). In order to have a complete record of the work, it would be helpful if you could submit before and after photos that document the condition of the surface casings. It appears that with the exception of A44-11 that any damages are "shallow". Prior to finalizing the repairs on A44-11, please have the platform contact the Inspectors so that one might travel to the platform and examine this well. I will place a copy of this message in the various well files. We will look for the 404s documenting the repairs. A further question, has anything similar been noticed on Platform C? Call or message with any questions. Tom Maunder, PE AOGCC From: Jeff_Gasch@xtoenergy.com [mailto:Jeff_Gasch@xtoenergy.com] Sent: Thursday, August 21, 2008 7:49 AM To: Maunder, Thomas E (DOA) Cc: Scott Griffith@xtoenergy.com; Paul_Figel@xtoenergy.com Subject: XTO Energy - Platform A Conductors tr~~~~~ All0 ~ ~ 2008 Tom, Per our conversation Tuesday and your request here is a summary of what we have found. We are unsure if we need to file a sundry notice to repair the surface casing. Please look this over at your earliest convenience and let us know if we need to file a sundry. We would like to begin repairs ASAP. Please contact me with any questions. In the summer of 2007 production personnel on the platform noticed a small area of bubbling paint and rust stains on the conductor of A32-11 R. On July 16, 2007 an ultrasonic wall thickness inspection was performed on all conductors on both platforms (A & C). Seven conductors on Platform A were identified as having possible corrosion and flagged for further inspection. The remaining conductors on A and all conductors on C appear to be in good condition. The annular space between the outside of the surface casing and inside of the conductor pipe is filled with groutlcement to the top of the conductor. Starting in June 2008 this grout/cement has been chipped out to varying depths on the seven wells in question to determine if any corrosion exists on the surface casing. Below is the summary of findings for each well: (Conductor pipe is 24" OD w/ 0.500" - 0.520" nominal wall thickness) A11-12 (166-044) -Ultrasonic Thickness (UT) showed hole in conductor 1.5" below top and other corrosion (0.160" wall thickness remaining) was noted. Corrosion limited to top of conductor. Grout/cement was chipped down to 20" to inspect surface casing. Plan to weld repair conductor and re-fill conductor with grout. A11-13RD2 (181-060) - No visible exterior corrosion on conductor. Conductor UT readings showed corrosion 8/22/2008 Page 2 of 2 limited to top of conductor with minimum reading of 0.300" thickness remaining. Grout/cement was chipped exposing an 8" band of corrosion ranging from 0.100" to 0.350" wall thickness remaining on the 10-3/4" surface casing (nominal wall thickness 0.350"). Plan to repair area of corrosion and re-fill annulus with grout. A22-14LS (194-071) - No visible exterior corrosion on conductor. Conductor UT readings revealed corrosion (minimum of 0.300" wall thickness remaining) which is limited to the top of the conductor. Grout was chipped down 6" and surface casing is ready to UT test. If UT test is good then plan to re-grout surface csg x conductor annulus. A31-14LW (194-044) - No visible exterior corrosion on conductor. Conductor UT readings showed scattered corrosion extending from top to 44" down. Drilled holes in the thin spots of the conductor and found 3-4' void full of water. Cut a 9" x 10" window in conductor approximately 54" from top. Surface casing looks good at this depth. Void extends to approximately 5-6' from top of conductor. Chipped grout from top of conductor and found 1-1/4" x 8" hole in surface casing at 20" from top. Cut window in conductor in-line with surface casing corrosion to get a better look at the corrosion and 7-5/8" intermediate casing. The 7-5/8" intermediate casing looks good. Surface casing corrosion appears to be limited to the top of the void area. Plan to repair surface casing by welding fabricated sleeve over area of corrosion then fill void with grout. A32-11R (193-092) - 3 small holes in conductor. UT readings showed corrosion limited to top 36" of conductor with 0.160" minimum wall thickness remaining. Chipped grout down from surface of conductor and found small holes through surface casing. Waiting on more UT numbers to determine extent of surface casing corrosion. Plan to find extent of corrosion, weld repair surface casing and re-fill annulus with grout. A42-14 (167-041) - No visible exterior corrosion on conductor. UT readings showed scattered corrosion near top with minimum wall thickness reading of 0.300". Grout was chipped to 10" depth. UT readings on the surface casing looked good with wall thickness readings ranging from 0.333"-0.350" (nominal wall thickness of 10-3/4" surface casing is 0.350"). Plan to re-fill with grout. ~~ A44-11 (167-035) -Two holes found in conductor 15" from top and 7" apart. UT readings show that corrosion extends downward. At 36" from top minimum wall thickness is 0.100". Grout was chipped down and found small holes in surface csg. Chipped down another 2 feet and found a void in the surface casing x conductor annulus that extends down +/-35'. This void was filled w/ water. Cut window lower in conductor and drained water. Surface casing looks good at this depth. Plan to weld repair surface casing and fill conductor with grout to surface. Thanks, Jeff Gasch Production Engineer XTO Energy Office # (432) 620-6742 Cell # (432) 638-7433 Fax # (432) 687-0862 8/22/2008 MEMORANDUM e State of Alaska e Alaska Oil and Gas Conservation Commission TO: Jim Regg ? tt. P.I. Superviso~ '--, ì1 j.J ./ I n¡ tr ~ liJ\p DATE: Thursday, May 25,2006 SUBJECT: Mechanical Integrity Tests XTO ENERGY INC A44-11 MGS A44-11 ~t5 ~O \\9'\ FROM: Jeff Jones Petroleum Inspector Src: Inspector Reviewed By: P.I. Suprv ~.lj3¡Z- Comm NON-CONFIDENTIAL Well Name: MGS A44-\l API Well Number 50-733-20027-00-00 Inspector Name: Jeff Jones Insp Num: mitlJ060524151813 Permit Number: 167-035-0 Inspection Date: 5/23/2006 Rei Insp Num Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well I A44-11 IType Inj. I N i TVD I 2966 IA 1 10 1760 1700 I 1690 : ¡ i 1 I P.T. I 1670350 !TypeTest I SPT i Test p~ 1500 1 OA 0 0 0 0 ì I , Interval 4YRTST P/F P Tubing I 150 150 150 150 I " Notes Test performed in a satè and proficient manner by XTO personneL t~{'~ j!j NNF:: I·.. ....v\J ...','''.......- ~~ ð Thursday, May 25, 2006 Page 1 of 1 WATER INJECTION REPORT PLATFORM A DISPOSAL WELL November-2002 A33-11LS A41A-[ ILN A44-11 AII-13R2 Ali-12 A33-14 A44-02 DATE. & NOTES INJ IN.I INJ INJ ANNU INJ IHI ANNU lHJ INJ ANNU INJ l~J ANNU EqJ IHJ ANNU IHl INJ Ol -Nov~2002 1010 3600 5( 597 3600 C 0 100 60 288 3600 I81 522 3600 25{ 508 3600 15( 792 3600 02-Nov-2002 1000 3600 5(612 3600 0 100 60297 3600 181527 3600 25~ 518 3600 10( 776 3600 03-Nov-2002 976 3600 5( 606 3600 0 100 6~ 316 3600 18:546 3600 25( 550 3600 10( 773 3600 04-Nov-2002 983 3700 5( 603 3700 0 100 6(2344 3700 18'. 240 3100 30( 591 3700 7: 784 3700 05-Nov-2002 975 3700 5( 600 3700 0 100 6~179 3700 185! 609 3100 30( 572 3700 7: 773 3700 06-Nov-2002 968 3575 5( 587 3650 0 100 6~246 3650 185592 3650 30( 606 3650 7' 773 3650 07-Nov-2002 970 3600 5( 589 3650 0 90 6( 242 3650 90595 3650 221 609 3650 55]769 3650 08-Nov-2002 965 3600 5( 600 3650 0 100 6( 255 3650 90593 3650 22( 606 3650 5( 763 3650 09-Nov-2002 963 3600 5¢ 592 3650 0 100 6( 274 3650 90589 3650 22! 601 3650 60 764 3650 10-Nov-2002 957 3600 5( 604 3650 0 100 6( 286 3650 90 590 3650 22! 608 3650 50 759 3650 I I-Nov-2002 832 3600 5( 550 3650 0 100 6( 229 3650 90 504 3650 21( 511 3650 50 656 3650 [2-Nov-2002 932 3600 4.' 605 3650 0 100 6( 163 3650 90 594 3650 21( 57l 3650 50 748 3650 13-Nov-2002 926 3575 50 597 3650 0 100 6( 182 3650 90 593 3650 22! 561 3650 55 752 3650 14-Nov-2002 918 3550 50 594 3650 0 50 6( 210 3650 170 591 3625 22! 564- 3650 55 743 3650 15-Nov-2002 920 2575 50 607 3650 0 50 6( 212 3650 150 596 3650 20( 576 3650 50 741 3650 16-Nov-2002 9[4 3600 45 610 3650 0 50 6( 208 3650 150591 3650 22! 571 3650 50734 3650 17-Nov-2002 981 3650 40 648 3700 0 50 6( 277 3650 150 705 3700 17: 762 3700 0 776 3700 18-Nov-2002 952 3650 40 641 3700 0 50 6( 266 3700 150683 3700 15( 709 3750 0 758 3700 19-Nov-2002 935 3650 40 634 3700 0 50 6( 263 3700 150 670 3700 15( 689 3750 0 748 3700 20-Nov-2002 927 3650 40 618 3700 0 50 6( 273 3700 15065l 3700 15( 655 3750 0 737 3700 2 I-Nov-2002 941 3625 45 622 3700 0 100 5( 269 3700 145 657 3700 17' 668 3700 25 747 3700 22-Nov-2002 943 3625 80 633 3700 0 100 5( 283 3700 150 659 3700 17: 671 3700 0 747 3700 23-Nov-2002 924 3625 45 617 3700 0 100 5(288 3700 150641 3700 17: 648 3700 25 732 3700 24-Nov-2002 934 3625 45 613 3700 0 100 5( 284 3700 145 642 3700 17: 651 3700 25 740 3700 25-Nov-2002 934 3625 45 631 3700 0 100 5( 296 3700 145 647 3700 17: 667 3700 25 732 3700 26-Nov-2002 942 3625 40 635 3700 0 100 5( 296 3700 145653 3700 17: 673 3700 25 735 3700 27-Nov-2002 922 3625 45 609 3700 0 100 5( 277 3700 145630 3700 175 638 3700 25 728 3700 28-Nov-2002 938 3625 85 630 3700 0 100 5(286 3700 145634 3700 175 640 3700 0 735 3700 29-Nov-2002 907 3625 40 620 3700 ~ 0 50 5( 265 3700 14~605 3700 15( 598 3700 25 707 3700 30-Nov-2002 910 3625 40 602 3700 0 0 50 5( 258 3700 140592 3700 15( 582 3700 25 709 3700 TOTAL 25,299 18,306 0 7,812 17,941 18,374 22,431 MAXIMUM 3,700 85 3,700 0i 100 6( 3,700 I85 3,700 300i 3,750 150 3,700 AVERAGE 943 3,584 49610 3,672 0 0 85 55 260 3,670 142 598 3,631 206i 612 3,677 43748 3,672 ii DAYS 30 30 0 30 30 30 30 12/12/2002 SGANNE¢ ~AR ill 0 ZOO3 WATER INJECTION REPORT PLATFORM A DISPOSAL WELL October-2002 A33-1 liS A41A-I ILN A44-11 Al 1-13R2. Al 1-12 A33-t4 A44-02 DATE & lqOTES I~,l INJ INJ INJ INJ INJ ANNU INJ INJ ANNU INJ INS 1~$ INJ ANNU INJ I'NJ 01-Oct-2002 961 3575 140 559 3625 £ 0 100 7.~ 380 3625 13{ 550 3650 36( 557 3650 200 709 3650 9( 02-Oct-2002 965 3575 130 559 3625 £ 0 100 7I 364 3625 13{ 550 3650 35( 554 3650 191 719 3650 03-Oct.2002 959 3575 130 552 3625 ¢ 0 100 7I 375 3625 131550 3650 35( 557 3650 191 707 3650 04-Oct.2002 963 3575 130 555 3625 £ 0 100 7( 386 3625 13I 558 3650 35( 571 3650 191 716 3650 8£ 05-Oct-2002 1021 3575 100 598 3625 £ 0 100 7( 446 3625 II{ 650 3650 32{ 741 3650 161 773 3650 8£ 06-Oct-2002 831 3575 80 516 3625 £ 0 100 7( 367 3625 101 537 3650 30( 589 3650 161 623 3650 07-Oct-2002 930 3575 50 537 3625 £ 0 100 7( 265 3625 14( 561 3650 26( 655 3650 5( 703 3650 £ 08-Oct-2002 959 3575 50 569 3625 £ 0 100 7( 272 3625 17( 572 3650 27.~ 669 3650 6( 707 3650 09-Oet-2002 1014 3575 50594 3625 £ 0 100 7(345 3625 t71652 3650 25( 710 3650 6( 774 3650 10-Oct-2002 979 3625 100 579 3650 £ 0 100 6.~ 342 3650 12: 607 3650 26( 612 3650 4( 745 3650 1 l-Oct-2002 971 3625 65 605 3650 £ 0 100 7( 341 3650 I2.~ 598 3650 26( 610 3650 4~ 738 3650 £ 12-Oct-2002 979 3625 65 610 3650 ~ 0 100 6.~ 349 3650 12.~ 60~ 3650 26( 618 3650 IIX 739 3650 {3 13-Oct-2002 955 3625 65 570 3650 ~ 0 I00 6( 332 3650 13( 586 3650 27{ 589 3650 IIX 722 3650 14-Oct-2002 958 3625 65 562 3650 £ 0 100 6( 313 3650 13.~ 586 3650 27.~ 591 3650 Ill 718 3650 {3 15-Oct-2002 952 3625 65 571 3650 £ 0 100 6( 320 3650 13.~ 583 3650 275 593 3650 111 705 3650 16-Oct~2002 974 3625 55 606 3650 £ 0 100 6.~ 343 3650 12.~ 601 3650 2.5( 615 3650 91 734 3650 17-Oct-2002 960 3600 60 572 3650 0 100 6( 343 3650 1~ 587 3650 25( 595 3700 93 723 3700 18-Oct-2002 958 3600 50 598 3650 0 50 6( 355 3650 121 593 3675 25( 612 3700 9~ 716 3650 19-Oct-2002 956 3600 50 585 3650 0 50 6( 351 3600 Il.~ 585 3650 25( 594 3700 9( 712 3650 20-Oct-2002 951 3600 55 564 3650 0 50 6( 345 3600 121 581 3650 25( 587 3700 9( 706 3650 0 21-Oct-2002 598 3600 60 350 3650 0 50 6( 213 3650 121 369 3650 25( 373 3700 ~ 448 3700 0 22-Oct-2002 0 3600 60 0 3650 £ 0 50 6( 0 3650 121 0 3650 25( 0 3700 ~ 0 3700 0 23-Oct-2002 0 2050 60 0 1000 £ 0 50 6( 0 950 121 0 2850 25( 0 3100 ~ 0 2200 0 24-Oct-2002 29 1900 440 16 950 £ 0 100 6( 3 950 29( 7 2850 60( 8 3000 60( I1 2150 470 25-Oct-2002 326 1800 380 240 1950 £ 0 100 6( 7 1850 30( 74 2850 55( 107 3025 52.~ 119 2100 380 26-Oct-2002 700 1700 295 336 950 £ 0 100 6( 106 850 30: 237 2800 60( 9 2950 60( 309 , * 1950 490 27-Oct-2002 1430 3600 20 779 3650 £ 0 100 7{ 227 3650 191 693 3650 17.~ 656 3650 1093 g 3650 0 28-Oct-2002 1225 3625 25 723 3700 £ 0 100 7( 270 3700 171 724 3700 151 793 3700 961 3700 0 29-Oct-2002 1046 3600 40 649 3650 £ 0 100 6( 267 3650 15: 587 3650 17.~ 595 3650 824 3650 0 30-Oct-2002 [045 3475 50 614 3600 ¢ 0 100) 6( 197 3600 18.~ 501 3600 25( 463 3600 151 827 3600 0 31-Oct-2002 lO10 3600 50 605 3600 £ 0 100 6( 271 3600 18.~ 522 3600 25( 503 3600 151 808 3600 TOTAL 26,605 15,773 0 8,495 15,405 15,726 19,789 MAXIMUM 3,625 440 3,700 {3 100 7.~ 3,700 305 3,700 60~ 3,700 60(3 3,700 49( AVERAGE 858 3,371 98 509 3,327 0 0 90 65 274 3,315 15.~ 497 3,54~ 294 507 3,577 147 638 3,453 # DAYS 29 29 0 29 29 29 29 I 1/12/2002 WATER INJECTION REPORT PLATFORM A DISPOSAL WELL September-2002 A33-[ ILS A41A-I ILN A44-11 Al 1-13R2 Al 1-12 A33-14 A44-02 DATE & NOTES INJ INJ ANNU INJ INJ INS INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ INI INJ 0 I-Sep-2OO2 981 3625 2651610 3600 0 0 100 80429 3625 12.' 607 3650 40( 620 3650 20( 722 3650 1213 02-S¢p-2002 948 3625 285 605 3600 0 0 100 80397 3625 130 546 3650 40( 523 3650 25£ 693 3650 03-Sep-2002 966 3625 275 608 3600 0 0 100 80397 3625 135 555 3650 40( 543 3650 25£ 703 3650 1413 04-S¢p-2OO2 952 3625 275 605 3600 0 0 IOO 80388 3625 140 544 3650 40( 532 3650 25( 698 3650 1313 05-$¢p-2OO2 870 3625 275 543 3600 0 0 lO0 80308 3625 140 446 3650 40( ~ 3650 25( 585 3650 06-Sep-2OO2 1028 3625 275 596 3600 0 0 IOO 80 341 3625 140 561 3650 40( 583 3650 25( 755 3650 13C 07-Sep-2OO2 610 3625 250 608 3600 (3 0 IOO 80 343 3625 150 539 3650 40( 540 3650 22( 715 3650 1213 08-Sep-2oo2 1116 3625 200 583 3600 G 0 IOO 80 351 3625 150 540 3650 38( 543 3650 22( 719 3650 121 09-Sep-2002 995 3625 215 594 3600 (3 0 100 80352 3625 150 540 3650 40( 540 3650 22( 715 3650 14~ 10-Sep-2OO2 983 3625 215 598 3600 (3 0 tOO 80357 3625 150 543 3650 40( 544 3650 22( 711 3650 1413 1 I-Sep-2OO2 958 3625 215 586 3600 13 0 IOO 8(~ 354 3625 150 535 3650 40( 537 3650 22( 705 3650 141 12-Sep-2002 973 3600 210 574 3650 C 0 [OO 8{3 349 3650 145 559 3650 390 595 3650 22.~ 715 3650 141 13-Sep-2002 975 3600 21G 584 3650 0 100 8(3 338 3650 145 561 3650 375 565 3650 22( 717 3650 91 14-Sep-2002 957 3600 210 573 3650 0 100 8{~ 334 3650 145 541 3625 375 541 3650 21( 707 3650 9( 15-S¢p-2OO2 1015 36/30 1813 585 3650 0 loo 8{~ 379 3650 130 627 3625 350 703 3650 151 746 3650 101 16-Sep-2002 958 3625 15/3579 3650 0 100 8C357 3625 125 560 3650 375 558 3650 1751711 3650 91 17-S¢p-2OO2 955 3575 20(3 566 3625 0 IOO 8(3 336 3650 135 548 3650 380 547 3650 225i 699 3650 11£ 18-Sep-2OO2 967 3575 1913 573 3625 0 100 8(3 361 3625 135 554 3650 380 556 3650 2l~ 709 3650 19-S¢p-2002 953 3600 1913 561 3600 0 50 8(3 367 3600 14(3 543 3650 375 547 3650 200 698 3650 10! 20-5¢p-2002 975 3550 18C 574 3600 0 50 81 391 3600 1313 561 3650 375 574 3650 200 717 3650 111 2 I-S¢p-2OO2 961 3550 1713 568 3625 0 50 8( 379 3600 1313 546 3650 350 557 3675 200 697 3650 101 22-Sep-2OO2 966 3550 175 574 3600 0 50 81 382 3600 1313 548 3650 350 560 3650 200 705 3650 101 23-Sep-2OO2 94[ 3550 17C 567 3600 0 50 81 366 3600 131 543 3650 350 545 3675 200 691 3650 IIX 24-Sep-2002 956 3550 17£ 570 3600 0 50 81 367 3600 13£ 544 3650 350 552 3675 200 695 3650 101 25-Sep-2OO2 947 3550 161 558 3600 0 50 8£ 363 3600 131 541 3650 350 556 3675 200 691 3650 101 26-S¢p-2002 953 3550 16( 569 3600 0 100 71 363 3600 131 539 3650 375 545 3650 200 691 3650 9! 27-$¢p-2002 954 3550 155 566 3600 0 100 81 370 3600 131 540 3650 375 550 3650 200 692 3650 9.~ 28-Sep-2OO2 964 3550 141 560 3600 0 100 8( 370 3600 131 546 3650 375 558 3650 200 701 3650 9.~ 29-Sep-2002 947 3550 151 566 3600 0 IOO 8( 359 3600 131 532 3650 375 541 3650 200 695 3650 101 30~Sep-2002 954 3550 141 555 3625 0 100 7( 364 3625 13£ 538 3650 350 547 3650 190 704 3650 9( TOTAL 28,678 17,358 0 10,912 16,427 16,646 21,102 MAXIMUM 3.625 285 3,650 IOO Si 3,650 15C 3,650 ~d)0 3,675 250 3,650 AVERAGE 956 3,590 202 579 3,612 0~ 0 88 7g 364 3,620 13t 548 3,648 379 555 3,653 212 703 3,650 11'~ # DAYS 30 30 0 30 30 30 30 10/14/2002 8CANNED ~AR 1 0 2003 WATER INJECTION REPORT PLATFORM A DISPOSAL WELL June-2002 A33-1 IlLS A41A-11LN A44-11 All-13R2 All-12 A33-14 A44-02 DATE & NOTES INJ RgJi ANNU lHJ INS INJ INS ANNU INS INJ ANNU INJ INJ ANNU 1NJ l~lJ ANNU INJ INJ 01-Jun-2002 1077 36~0 12(628 3600 0 100 12( 344 3600 15 625 3650 150 636 3600 C 724 3650 02-Jun-2002 1089 36~0 12( 624 3600 0 100 120 349 3600 15 621 3650 150 628 3600 717 3650 03-Jun-2002 1081 3625 13(612 3600 0 100 120 352 3600 15 617 3650 150 615 3600 13718 3650 0 04-Jun-2~02 1105 3625~ 14( 613 3600 0 I00 1202 352 3600 15 609 3650 150 624 3600 710 3650 0 05-Jun-2002 1033 33~0 14( 606 3600 0 t00 120 352 3600 15 600 3650 150 584 3600 706 3650 0 06-Jun-2002 1070 14( 621 3600 0 100 110358 3600 lC 607 3650 160 609 3600 C 717 3650 0 07-Jun-2~02 1072 3~55 15( 623 3600 0 100 115! 361 3650 15 606 3650 195 604 3650 13724 3650 0 08-Jun-2002 1076 3 16(610 3600 0 100 115 366 3600 15 620 3650 200 614 3650 £ 729 3650 0 09-Jun-2002 1064 36~25, 16( 591 3600 0 100 1151 360 3625 15 603 3650 200 604 3650 £ 72l 3650 0 10-/un-2002 1075 36~5 16( 619 3600 0 100 115 364 3625 15 613 3650 200 619 3650 ¢ 733 3650 0 l 1 -Jun-2002 1056 3625 16-' 606 3600 0 100 115; 360 360 15 600 3625 200 599 3650 13 721 3650 0 12-Jun-2002 1072 36~25 17( 609 3650 0 100 1151 358 3625 15 612 3650 200 614 3650 £ 732 3650 0 13-Jun-2002 1052 3425 17( 590 3650 0 100 115 352 3625 15 598 3650 200 597 3650 £ 715 3650 0 [4-Jun-2002 1065 36~25 17( 599 3650 0 I00 115 354 3625 15 611 3650 200 607 3650 £ 730 3650 0 15-Jun-2002 1049 36~25 17( 557 3650 0 I00 1151 350 3625 15 590 3650 200 582 3650 £ 713; 3650 0 16-Jun-2002 1050 3~25 21( 552 3650 0 100 1151 314 3625 11¢ 591 3650 200 587 3650 ¢ 7071 3650 0 17-Jun-2002 1057 3625 21( 597 3650 0 100 1151 344 3625 11¢ 604 3650 2~0 613 3650 ¢ 723! 3650 0 [8-Jun-2002 1056 3625 21(585 3650 0 100 11.~ 342 3625 1113601 3650 200 602 3650 13727] 3650 0 19-1un-2~02 1053 3625 21( 569 3650 0 100 11.~ 347 3625 1113 596 3650 200 596 3650 13 721; 3650 0 20-Jun-2002 1049 3625 21(569 3650 0 100 40 344 3625 1113596 3650 175 595 3650 13723! 3650 0 2 l-Jun-2002 1049 3625 21(569 3650 0 100 4( 345 3625 1113597 3650 1751 598 3650 C 728! 3650 0 22-Jun-2~02 1040 3625 22.' 560 3625 0 100 4( 341 3625 1113590 3650 200 591 3650 13719 3650 0 23-Jun-2002 11}46 3625 22.' 559 3625 0 100 4( 316 3625 115 588 3650 20( 588 3650 C 717, 3650 0 24-Jun-2002 1043 36~25 22.~ 561 3625 0 100 4( 344 3625 115 584 3650 20( 579 3650 (~713 3650 0 25-Jun-2002 1044 3625 24( 560 3625 0 100 5{ 346 3625 115 585 3650 20( 584 3650 I] 712 3650 0 26-3'un-2002 1046 3625 25( 563 3625 '£ 0 1043 5{ 359 3625 115 586 3650 20( 587 3650 1~ 711 3650 0 27-1un-2002 1044 3625 24~' 562 3625 13 0 100 5{ 365 3650 1113 587 3650 20( 591 3650 (] 717 3650 0 28-Jun-2002 1034 3625 26(561 3600 0 100 5{366 3650 1113577 3650 22.' 573 3650 ~ 703 3650 0 29-Jun-2002 1044 3625 25.~ 565 3600 0 I00 5¢ 385 3650 1113586 3650 20( 591 3650 (~712 3650 0 30-1un-2002 1037 3625 27( 561 3600 13 0 100 5{ 380 3650 105 577 3650 22: 572 3650 (~ 700 3650 0 TOTAL 31,728 ! 17,601 0 10,570 17,977 17,983 21,543 MAXIMUM 3,625 2713 3,650 0 100 12( 3,650 115 3,650 225 3,650 0 3,650 01 AVERAGE 1,058 3,621 191 587 3,622 0 0 100 9~ 352 3,515 63 599 3,649 19f 599 3,640 0 718 3,650 # DAYS 30 I 30 0 30 30 30 30 07/11/2002 SCANNE 1 0 2DD3 WATER INJECTION REPORT PLATFORM A DISPOSAL WELL August-2002 A33- ! 1LS A41 A- l 1LN A44- I 1 A I 1 - 13R2 A 11 - 12 A33-14 A44-02 DATE & NOTES INJ INJ INJ INJ IN,/ 1NJ INJ INI ANNU INJ ][NJ ANNU INJ ll'4J INJ INJ ANNU 0 l-Aug-2002 959 3625 41{ 599 3650 0 0 100 7( 382 3650 135 545 3650 35(2 545 3650 225 683 3650 1212 02-Aug-2002 995 3625 4013607 3650 0 0 I00 7(377 3650 135 554 3650 35( 559 3650 225 700 3650 12{ 03-Aug-2002 1001 3625 395614 3650 0 0 70 7.~377 3650 140 557 3650 35( 562 3650 225 709 3650 125 04-Aug-2002 993 3625 39{2 603 3650 0 0 100 8( 377 3650 140 554 3650 375 564 3650 225 702 3650 125 05-Aug-2002 993 3625 375 603 3650 0 0 70 8( 382 3650 135 558 3650 35( 570 3650 225 703 3650 125 O6-Aug-2002 993 3625 375 608 3650 0 0 75 8t)384 3650 135 560 3650 35£ 568 3650 225 708 3650 12{2 07-Aug-2002 1012 3625 355 608 3650 0 0 75 80 334 3650 150 . 562 3650 35( 581 3650 2012 706 3650 12£ 08-Aug-2002 1000 3625 35.< 602 3650 0 0 75 80 321 3650 150 560 3650 35( 570 3650 2012 699 3650 1212 09-Aug-2002 987 3625 355 609 3650 0 0 75 80 317 3650 150 555 3650 35£ 569 3650 20( 699 3650 1212 10-Aug-2002 996 3625 34( 606 3650 0 0 75 80 277 3650 170 557 3650 32( 577 3650 20(12 698 3650 12{2 1 I-Aug-2002 992 3625 34( 598 3650 0 0 75 80 266 3650 170 556 3650 32( 571 3650 2012 694 3650 12t2 12-Aug-2002 930 3625 34( 560 3650 0 0 75 80 254 3650 170 527 3650 32( 565 3650 20t2 656 3650 12{2 13-Aug-2002 987 3625 34( 573 3650 0 0 75 80 322 3650 170 561 3650 32( 632 3650 2012 691 3650 12£ 14-Aug-2002 1085 3625 34( 629 3650 13 0 75 80 464 3650 170 727 3650 32( 798 3650 20(12 814 3650 t212 15-Aug-2002 999 3650 29{ 626 3650 13 0 100 80 406 3650 125 617 3650 35( 605 3650 20(12 749 3650 75 16-Aug-2002 992 3650 30.~ 626 3650 13 0 100 80 399 3650 130 603 3650 37.~ 596 3650 2012 740 3650 95 17-Aug-2002 984 3625 31( 620 3650 13 0 100 80 398 3650 130 592 3650 375 580 3650 20( 735 3650 10( 18-Aug-2002 973 3625 32( 620 3650 l} 0 100 80 388 3650 135 578 3650 40( 567 3650 21{2 721 3650 11£ 19-Aug-2002 978 3625 31( 617 3650 13 0 100 80 388 3650 135 584 3650 40( 580 3650 20( 718 3650 1212 20-Aug-2002 975 3625 31( 613 3650 13 0 100 80 390 3650 135 581 3650 40( 575 3650 20( 718 3650 12{2 21-Aug-2002 994 3625 30( 618 3650 13 0 100 80 410 3650 135 594 3650 39{ 593 3650 20( 728 3650 115 22-Aug-2002 986 3650 29( 616 3600 13 0 100 80 410 3625 125 590 3650 40( 586 3650 20( 718 3650 11£ 23-Aug-2002 965 3625 29.~ 613 3600 13 0 100 80 398 3625 1313 569 3650 40( 561 3650 20( 713 3650 12{2 24-Aug-2002 1028 3625 29.~ 615 3600 13 0 100 80 405 3650 1313 578 3650 40( 574 3650 20( 715 3650 121: 25-Aug-2002 919 3625 29.~ 614 3600 l} 0 100 80 401 3625 1313 568 3650 40( 559 3650 225 714 3650 1212 26-Aug-2002 972 3625 29.~ 615 3600 { 0 100 80 404 3625 1313 571 3650 40( 566 3650 225 711 3650 1212 27-Aug-2002 968 3625 29( 617 3600 { 0 100 80 406 3625 1313 568 3650 40( 562 3650 225 723 3650 12{ 28-Aug-2002 955 3625 29.' 602 3600 ¢ 0 100 80 396 3625 1313 557 3650 40( 549 3650 225 693 3650 12{ 29-Aug-2002 961 3625 29.~611 3600 {2 0 100 80 397 3625 135560 3650 40( 551 3650 225 707 3650 135 30-Aug-2002 974 3625 28.~ 604 3600 { 0 100 80 401 3625 135 570 3650 40( 565 3650 225 717 3650 14( 31 -Au~-2002 987 3625 28¢ 606 3600 { 0 100 80 409 3625 135 579 3650 40( 588 3650 225 717 3650 14( TOTAL 30.533 18,872 0 I 1~640 17,792 17,988 22,099 MAXIMUM 3,650 41( 3,650 0 100 80 3,650 170 3,650 40( 3,650 225 3,650 14t] AVERAGE 985 3,627 32~ 609 3,634 0 0 91 79 375 3,643 140 574 3,650 37{ 580 3,650 211 713 3,650 1t9 # DAYS 31 31 0 3l 31 31 31 09/16/2002 SCANNED MAR 1 0 2003 MEMORANDUM ( State of Alaska Alaska Oil and Gas Conservation Commission TO: Cammy O. Taylor ~o~ DATE: June 14, 2002 Chair (~1 SUBJECT: Mechanical Integrity Tests THRU: Tom Maunder ~';~-\ _~.~-~ Cross Timbers Operating [..- -c.., --- "A" Petroleum Engi~,e'~ ~ '~ XTO ~-,Al1-13, Al1-12, A44-11 FROM: Lou Grimaldi \ Middle Ground ShoalField Petroleum Inspector ~ 1~, ~ ~,-- ~-~ ~-'~..."~. NON.- CONFIDENTIAL Packer Depth Pretest Initial 15 Min. 30 Min. Wa~lAi4-~3R21Type~ni.I s IT.V'.D-I I Tub,.;I3600 I 3600 I 3600 I 3600"llntervall I' P..T.D.I 484-06o ITypetestl P' Imestpsil 2oso Ic==i.~l ~o I'==oo I ,2~o I =~ol .~ I _P Notes: WellI A1'1-'~2 I Typelnj.[ S IT-V-D- I I Tubin;I 3sso I 3sso' I ~s0 I 3ssoI lntervall I P.T.D.I 4Sr,-'044 ITypetestl P ITe~tp='l 4950 I casin;I 450 I 2050 I 2040 I 2040 I P/F ! E w~,,I A,~-~ I~P~"i.I SN'I T.V.O. I I~"b,~l ~o~ I ~o I' ~oo I ~oo I~,~,,I ~ P.T.D.I 467-035 ITypetestl P ITes, tpsil 4720' I¢asin;I,' 400 I 4925 I 4eoo I 47eo,,I,. P/F IP Notes: Well was shut-in and ~ld, large d~rea~ due to the~al ~ntraction. Ob~wed for add. 30 min's. Type INJ. Fluid Codes F = FRESH WATER INJ G = GAS INJ. S = SALT WATER INJ N = NOT INJECTING Type Test M= Annulus Mon~onng P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Interval I= Initial Test 4= Four Year Cycle V= Required by Variance W-- Test during Workover O= Other (describe in notes) Test's Details I was onboard "A" platform for SVS tests and observed these MIT's with Tom Reese. These wells were recently worked over and had been tested by the rig during completion, These were the first official tests of the wells casing/tubing integrity. All wells passed their MIT's. A44-11 was shut-in and appeared to have some thermal contraction which caused a large (1,25 psi) decrease in the initial 15 minutes. This settled down during the 2nd half of the test. I continued to observe this well during the SVS tests and felt this wells casing/tubing were competent. M.I.T.'s performed: Three Attachments: Number of Failures: None Total Time during tests: cc: Dou.q Marshall {XTO) MIT report form 5/12/00 L.G. 020614-MIT MGS A LG.xls 7/13/2002 DISPOSAL WELL Ma~h-99 A34-14 A4 IA-I I LN A44-11 Al 1-13R2 A11-12 A23-0 IR Ai2-12 A33-14 OATE & ~T~ INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU 01-M~-99 811 3600 50 1239 3550 0 0 50 63 54 3600 70 466 3600 50 lll4 3650 3500 0 0 0i 558 3600 50 02-M~-99 813 3600 50 1247 3550 0 0 50 63 44 3600 70 468 3600 50 Ill9 3650 3500 0 0 0 556 3600 50 03-M~-99 801 3600 50 1225 3550 0: 0 50 63 45 3600 70 459 3600 50 1098 3650 3500 0 0 0 549 3600 60 04-M~-99 806 3600 55 1231 3550 0i 0 50 63; 50 3600 70 462 3600 40 lll0 3600 3475 0 0 0 554 3600 50 05-M~-99 806 3600 60 1229 3550 0 0 50 64i 59 3600 70 456 3600 25 1108 3600 3450 0 0 0 556 3600 50 06-M~-99 811 3600 60 1236 3550 0 0 50 62 59 3600 701 457 3600 50 1111 3600 3500 0 0 0 558 3600 50 07-M~-99 848 3600 55 1269 3550 0 0 50 62 58 3600 70 488 3600 50 1147 3600 3500 0 0 0 600 3600 35 08-M~-99 821 3600 60 1223 3550 0 0 50 64 60 3600 70 477 3600 50 1112 3600 3500 0 0 0 578 3600 40 09-M~-99 846 3600 55 1252 3550 0 0 50 63 60 3600 70 492 3600 50 1140 3600 3500 0 0 0 604 3600 35 10-M~-99 839 3600 55 1255 3550 0 0 50 63 61 3600 70 489 3600 50 1138 3600 350¢ 0 0 0 595 3600 40 II-M~-99 806 3600 55 1231 3550 0 0 50 63 50 3600 70 462 3600 40 1110 3600 3475 0 0 0 554 3600 50 '~-M~-99 815 3600 50 1235 3550 0 0 50 64 58 3600 70 472 3600 50 1112 3600 3500 0 0 0 560 3600 65 ~-99 820 3600 50 1232 3550 0 0 50 65 53 3600 70 471 3600 50 1113 3600 3500 0 0 0 567 3600 65 N~a~'/M~-99 819 3600 50 1230 3550 0 0 50 66 61 3600 70 470 3600 50 1106 3600 3500 0 0 0 563 3600 60 15-M~-99 818 3600 50 1244 3550 0 0 50 64 58 3600 70 476 3600 50 1119 3600 3500 0 0 0 574 3600 60 16-M~-99 816 3600 50 1215 3550 0 0 50 66 52 3600 70 466 3600 50 1099 3600 3500 0 0 0 564 3600 60 17-M~o99 819 3600 50 1217 3550 0 0 50 63 56 3600 70 470 3600 50 1116 3600 3500 0 0 0 579 3600 50 18-M~-99 837 3600 50 1240 3550 0 0 50 60 61 3600 65 482 3600 50 1133 3600 3500 0 0 0 590 3600 45 19-M~-99 808 3600 55 1207 3550 0 0 50 62 62 3600 65 463 3600 50 1097 3600 3500 0 0 0 561 3600 55 20-M~-99 813 3600 55 1219 3550 0 0 50 62 58 3600 65 466 3600 50 1106 3600 3500 0 0 0 559 3600 60 21-M~-99 806 3600 55 1207 3550 0 0 50 62 53 3600 65 461 3600 50 1095 3600 3500 0 0 O[ 558 3600 60 22-M~-99 818 3600 55 1222 3550 0 0 50 62 55 3600 65 468 3600 50 1110 3600 3500 0 0 0 571 3600 60 23-M~-99 806 3600 55 1206 3550 0 0 50 63 57 3600 65 464 3600 50 1093 3600 3500 0 0 0 560 3600 65 24-M~-99 822 3600 55 1228 3550 0 0 50 641 54 3600 70 472 3600 50 1113 3600 3500 0 0 0 574 3600 65 25-M~-99 809 3700 60 1217 3700 0; 0 50 67~ 61 3700 70 462 3700 50 1098 3700 3495 0 0 0 560 3700 65 26-M~-99 811 3600 55 1215 3550 0i 0 55 64 55 3650 70, 461 3600 50 1097 3650 3495 0 0 0 562 3600 65 27-M~-99 810 3600 60 1214 3550 0 0 52 66 52 3625 70 459 3600 50 1098 3650 3490 0 0 0 565 3600 60 28-M~-99 815 3600 55 1220 3550 0 0 55 65 52 3625 70 461 3600 50 1103 3650 3500 0 0 0 574 3600 55 29-M~-99 813 3600 60 1217 3550 0 0 55 62 55 3625 65 460 3600 50 1101 3650 3495 0 0 0 572 3600 55 30-M~-99 814 3600 55 1218 3550 0 0 55 65 52 3625 70 460 3600 50 1103 3650 3495 0 0 0 574 3600 55 31-M~-99 816 3600 55 1225 3550 0 0 55 67 52 3625 70 460 3600 50 1104 3650 3495 0 0 0 572 3600 50 TOTAL 25,313 38,065 0 1,717 14,500 34,423 0 17,621 MAXIMUM 3,700 60 3,700 0 55 67 3,700 70 3,700 50 3,700 3,500 0 0 3,700 65 -RAGE 817 3,603 54 1,228 3,555 0 0 51 64 55 3,609 69 468 3,603 49 1,110 3,618 3,496 0 0 0 568 3,603 54 /AYS 31 31 0 31 31 31 0 31 8/99 I ~.bruary-99 01 -Feb-99 02-Feb-99 03-Feb-99 04-Feb-99 05-Feb-99 06-Feb-99 07-Feb-99 08-Feb-99 09-Feb-99 I 0-Feb-99 1 l-Feb-99 12-Feb-99 ¥99 i~b~'99 -99 i 6-Feb-99 17-Feb-99 18-Feb-99 19-Feb-99 20-Feb-99 2 l-Feb-99 22-Feb-99 23-Feb-99 24-Feb-99 25 - Feb-99 26-Feb-99 27-Feb-99 28-Feb-99 TOTAL MAXIMUM AVFu ~tGE o~,~9 I t0'7-o35 A34-14 743 3600 50 A41A-! ILN 796 3600 50 779 3550 50 791 3550 50 781 3550 5O 783 3575 50 781 3600 50 781 3575 S0 780 3600 50 799 3600 50 802 3600 50 797 3600 50 811 3600 50 821 3600 50 816 3600 50 810 3600 50 811 3600 50 800 3600 50 826 3600 55 812 3600 55 810 3600 55 754 36O0 55 876 3600 55 813 3600 55 1253 3500 1248 3500 1223 3500 1243 35O0 1231 35O0 1237 3500 1228 3500 1231 3500 1221 3500 1239 3525 1236 3550 1234 355O 1248 3550 1251 3550 1255 3550 1244 3550 1242 3550 1225 3550 1263 3550 1237 3550 1237 3550 !151 3550 1335 3550 1240 3550 812 3600 50 812 3600 50 809 3600 50 816 3600 50 22,422 3,600 52 801 3,593 51 28 1240 3550 1238 3550 1236 3550 1239 3550 34,705 3,550 i,239 3,533 28 0 0 0 52 58 WATER INJECTION REPORT PLATFORM A DISPOSAL WELL I I I I A44-1 ! { Al 1-13R2 I Ali-12 ] A23-0,R ] Al2-12 0 52 58 53 3600 60 421 3600 251 1135 3600 34501 0 0 52 3600 60 461 3600 25 111 ! 3600 3450 0 0 0 0 52 56 0 0 50 56 0 0 50 57 0 0 50 58 0 50 58 0 50 58 0 50 59 0 50 59 0 50 58 0 50 6C 0 0 50 0 0 50 60 0 0 50 60 0 0 5O 62 0 50 62 0 5O 62 0 50 62 0 50 59 0 0 50 61 0 0 50 62 0 0 50 63 0 0 50 63 0 0 50 63 0 0 50 63 0 0 50 63 0 0 50 63 0 52 63 0 0 50 60 0 53 3550 60 52 3550 60 49 3550 65 46 3575 65 47 3600 65 40 3575 65 42 3600 65 44 3600 65 44 3600 65 44 3600 60 43 3600 65 55 3600 65 67 3600 70 56 3600 70 54 3600 70 43 3600 70 40 3600 70 44 360O 65 55 3600 65 38 360O 65 43 3600 70 38 3600 70 42 3600 70 47 3600 70 49 3600 70 58 3600 70 1,338 450 3550 25 458 3550 10 452 3550 15 452 3575 25 450 3600 25 450 3575 25 450 3600 25 460 3600 25 463 3600 50 460 3600 50 468 3600 50 478 3600 50 477 3600 471 3600 50 470 3600 50 462 3600 50 476 3600 50 467 3600 50 465 3600 50 431 3600 50 501 3600 50 466 3600 50 466 3600 465 3600 50 465 3600 50 468 3600 50 12,923 1088 3600 3450 1105 3550 3430 1094 3600 3440 1093 3600 3440 1090 3600 3440 1091 3575 3440 1088 3550 3440 1109 3550 3440 1110 3550 3450 il07 3550 3450 1123 3550 345C i130 3600 3500 1129 3600 3475 I119 3600 3475 1119 3600 3500 1102 3600 3500 !139 3600 3500 1117 3650 3500 1115 3650 3500 1037 3650 35001 1205 3650 350C 1118 3650 3500 1118 3650 3500 1114 3650 3500 1113 3650 3500 1118 3650 3500 31,137 A33-14 [ 528 3600 50' 532 3600 5G 518 3550 50 526 3550 50 520 3550 50 516 3575 55 515 3600 60 515 3600 60 516 3600 60 540 3600 55 545 3600 40 538 3600 50 563 3600 50 578 3600 30 569 3600 35 561 3600 50 563 3600 40 550 3600 45 569 3600 45 560 3600 40 555 3600 451 515 3600 45 600 3600 50 560 3600 50 558 3600 50 558 3600 50 553 36OO 50 563 3600 50 15,284 3,600 60 546 3,594 48 28 3,600 70 48 3,593 66 28 3,600 50 462 3,593 40 28 3,650 3,50( 1,112 3,604 3,472 28 DISPOSAL WELL J~uary-99 A34-14 A4 IA-i ILN A44-11 Al 1-13R2 Al 1-12 A23-0 IR A12-12 A33-14 ACT [ I ACT I ^CT I I ACT I [ ACT I [ ACT I I ACT I [ ACT I[ & ~OTEg [NJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNUl [NJ /NJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU 01-J~-99 767 3600 50 1299 3550 0 0 50 5~ 45 3600 60 430 3600 25i 1187 3600 3350 0 0 0 468 3600 80 02-J~-99 710 3600 50 1228 3550 0 0 50 59 45 3600 60 411 3600 25! 1065 3600 3350 0 0 0 432 3600 03-J~-99 771 3600 50 1261 3600 0 0 50 59 44 3600 60 449 3600 25 Ili1 3600 3350 0 0 0 500 3600 04-J~-99 779 3600 50 1273 3600 0 0 50 59 45 3600 60 459 3600 25 !116 3600 3350 0 0 0 504 3600 80 05-J~-99 762 3600 50i 1244 3600 0 0 50 59 38 3600 60 449 3600 25 1088 3600 3350 0 0 O 491 3600 06-J~-99 764 3600 50 1245 3600 0 0 50 59 38 3600 60 449 3600 25 1089 3600 3350 0 0 0 490 3600 80 07-Jan-99 758 3600 45 1240 3500 0 0 50 59 33 3600 60 446 3600 25 1083 3600 3400 0 0 0 487 3600 40 08-Jan-99 768 3600 45 1249 3500 0 0 50 55 38 3600 60 451 3600 25 1092 3600 3420 0 0 0 497 3600 40 09-J~-99 761 3600 45 1239 3500 0 0 50 55 39 3600 55 446 3600 20 1084 3600 3425 0 0 0 489 3600 45 I0-J~-99 758 3600 45 1237 3500 0 0 52 60 38 3600 60 443 3600 20 1079 3600 3425 0 0 0 485 3600 50 11-J~-99 748 3600 45 1223 3500 0 0 52 60 34 3600 60 436 3600 25 1068 3600 3425 0 0 0 479 3600 50 12-J~-99 754 3600 45 1236 3500 0 0 52 61 41 3600 60 439 3600 25 1078 3600 3450 0 0 0 484 3600 55 J~.99 770 3600 50 1255 3600 0 0 52 62 49 3600 60 462 3600 25 1112 3600 3450 0 0 0 529 3600 0 ~-J~-99 795 3600 50 1272 3500 0 0 52 62 53 3600 60 488 3600 50 1139 3600 3450 0 0 0 570 3600 15 15-J~-99 792 3600 50 1268 3550 0 0 52 62 47 3600 60 487 3600 25 1134 3600 3450 0 0 0 562 3600 20 16-Jan-99 754 3600 50 1234 3500 0 0 52 62 38 3600 60 460 3600 50 1087 3600 3400 0 0 0 500 3600 80 17-J~-99 830 3600 50 1281 3550 0 0 52 581 33 3600 60~ 501 3600 50 1156 3600 3450 0 0 0 589 3600 2¢ 18d~-99 804 3600 50 1262 3550 0 0 52 60 33 3600 60 487 3600 50 1125 3600 3450 0 0 0 541 3600 40 19-J~-99 784 3600 50 1241 3500 0 0 52 60 27 3600 60 470 3600 50 1102 3600 3450 0 0 0 514 3600 45 20-J~-99 792 3600 50 1250 3500 0 0 52 60 32 3600 60 472 3600 50 1109 3600 3450 0 0 0! 523 3600 40 21-J~-99 784 3600 55 1237 3500 0 0 52 59 34 3600 60 467 3600 25 1104 3600 3450 0 0 0 523 3600 40 22-J~-99 804 3600 55 1266 3500 0 0 52 59 35 3600 60 477 3600 25 1120 3600 3450 0 0 0 533 3600 45 23-J~-99 779 3600 55 1236 3500 0 0 52 59 37 3600 60 463 3600 25 Il00 3600 3450 0 0 0 519 3600 50 24-J~-99 771 3600 55 1235 3500 0 0 52 58 38 3600 60 453 3600 25 1087 3600 3450 0 0 0 501 3600 60 25-Jan-99 786 3600 55! 1247 3500 0 0 52 58 36 3600 65 445 3600 25 1105 3600 3450, 0 0 0 518 3600 55 26-J~-99 780 3600 551 1237 3500 0 0 52 57 41 3600 65 452 3600 25 1099 3600 3450 0 0 0 520 3600 50 27-Jan-99 785 3600 55 1250 3500 0 0 52 58 40 3600 65 456 3600 25 1103 3600 3450 0 0 0 519 3600 55 28-J~-99 783 3600 60 1229 3500 0 0 52 58 47 3600 60 450 3600 25 1094 3600 3575 0 0 0 518 3600 50 29-J~-99 796 3600 60 1245 3500 0 0 52 58 47 3600 60 460 3600 25 1108 3600 3450 0 0 0 536 3600 50 30-J~-99 792 3600 60 1243 3500 0 0 52 58 52 3600 60 460 3600 25 1107 3600 3450 0 0 0 530 3600 50 31-J~-99 813 3600 60 1262 3500 0 0 52 58 52 3600 60 472 3600 25 1128 3600 3450 0 0 0 560 3600 50 TOTAL 24,094 38,724 0 1,249 14,190 34,259 0 15,911 MAXIMUM 3,600 60 3,600 0 52 62 3,600 65 3,600 50 3,600 3,575 0 0 3,600 80 'ERAGE 777 3,600 51 1,249 3,524 0 0 51 59 40 3,600 60 458 3,600 30 1,105 3,600 3,428 0 0 0 513 3,600 51: 2/DAYS 31 31 0 31 31 31 0 3 I 10/99 r-CE. IV c E' ,~,~IOVEMBER WATER ! N JECT ! ON REPORT PLATFORM A A34-14 A34-11 A4&' 11 A11 - 13 A11 - 12 A23-1 A12' 12 A33-14 ~ HONTH' i ACT iACT IACT i ACT I ACT I ACT I ACT J ACT J %NJ INJ ANNU INJ INd ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU DATE BBLS PRESS PSIG BBLS PRESS PSI6 BBLS PRESS PSIG BBLS PRESS PSI(] BBLS PRESS PSIG BBLS PRESS PSIG BBLS PRESS PSIG BBLS PRESS PSI6 01-Nov-90 836 3500 380 209 4300 0 0 P&A 60 415 3500 0 923 3500 0 1106 3500 40 591 3500 3200 02-Nov-90 03-Nov-90 04-Nov-90 05-Nov-90 06-Nov-90 07-Nov-90 08-Nov-90 O~-~ov-90 or-90 ~,mm,~ov-90 12-Nov-90 13-Nov-90 14-Nov-90 15-Nov-90 16-Nov-90 1?-Nov-90 18-Nov-90 19-Nov-90 20-Nov-90 21-Nov-90 22-Nov-90 23-No¥-90 24-Nov-90 25-Nov-90 26-Nov-90 27-Nov-90 28-Nov-90 29-Nov-90 30-Nov-90 948 3500 365 979 3500 360 896 3500 325 990 3500 350 942 3500 350 986 3500 340 960 3500 340 879 3500 340 922 35OO 34O 937 35OO 34O 872 3500 340 788 3500 340 861 3500 340 786 3500 290 931 3500 270 906 3500 275 809 3500 300 852 3500 285 907 3500 270 918 3500 265 833 3500 265 985 3500 265 904 3500 265 874 3500 263 916 3500 265 957 3500 190 957 3500 175 977 3500 155 1007 3500 140 230 4300 0 227 4300 0 225 4300 0 228 4300 0 226 4300 0 220 4250 0 '219 4250 0 194 4250 0 194 4250 0 206 4250 0 190 4250 0 172 4250 0 236 4250 0 213 4130 0 220 4150 0 219 4150 0 213 4150 0 193 4100 0 212 4150 0 222 43OO 0 221 4300 0 1 3250 , 0 49 3250 0 289 3250 0 293 3250 0 2?5 4350 0 262 4300 0 226 43OO 0 228 4200 0 # DAYS 12910/90 0 P&A 35 0 P&A 80 0 P&A 70 0 P&A 70 0 P&A 60 0 P&A 70 0 P&A 70 0 P&A 70 0 P&A 70 0 P&A 7O 0 P&A 70 0 P&A 70 0 P&A 70 0 P&A 70 0 P&A 60 0 P&A 60 0 P&A 60 0 P&A 60 0 P&A 60 0 P&A 70 0 P&A 70 0 P&A 70 0 P&A 70 0 P&A 70 0 P&A 7O 0 P&A 70 0 P&A 60 0 P&A 60 0 P&A 60 461 3500 0 468 3500 0 427 3500 0 468 3500 0 445 3500 0 464 3500 0 451 3500 0 413 3500 0 435 3500 0 439 3500 0 407 3500 0 362 3500 0 408 3500 0 368 3500 0 443 3500 0 432 35OO 0 378 3500 0 399 3500 0 428 3500 0 431 3500 0 387 3500 0 469 3500 0 427 3500 0 409 3500 0 409 3500 0 432 35OO 0 429 35O0 0 436 3500 0 440 3500 0 1066 3500 0 1112 3500 0 1001 3500 0 1115 3500 0 1061 3500 0 1121 3500 0 1091 3500 0 993 3500 0 1038 35OO 0 1069 3500 0 976 3500 0 868 3500 0 955 3500 0 863 3500 0 1034 3500 0 1009 3500 0 895 3500 0 943 3500 0 1005 3500 0 1021 3500 0 927 3500 0 1123 3500 0 1022 35OO 0 941 3500 0 958 3500 0 1022 3500 0 1018 3500 0 1041 3500 0 108~ 3500 0 0 0 80 0 0 66 30 12,780 130,295 3500 0 3500 426 3500 0 I 1010 3500 30 I 1303 3500 35 1340 3500 30 1184 3500 30 1350 3500 30 1255 3500 35 1353 3500 30 1291 3500 30 1173 3500 30 1242 3500 30 1300 3500 30 1205 3500 30 1066 3500 30 1140 3500 30 1062 3500 60 121'6 3500 30 1229 3500 30 1046 35OO 30 1183 35OO 6O 1236 3500 60 1258 3500 0 1136 3500 0 1400 3500 0 1239 3500 0 1147 3500 0 1230 35OO 0 1276 35OO 0 1274 35OO 0 1320 3500 0 1370 3500 0 658 3500 3150 674 3500 3150 609 3500 3150 668 3500 3150 638 35OO 3150 664 35OO 3150 646 35O0 3150 598 35OO 3150 627 35OO 3150 635 35OO 3150 59O 35OO 3150 530 35OO 3150 590 3500 3150 537 3500 3200 626 35OO 3200 615 35OO 32OO 549 3500 32OO 578 3500 32OO 615 35OO 32OO 621 35OO 32OO 561 35OO 32OO 669 35OO 32OO 614 35OO 3200 58/, 3500 3200 589 35OO 32OO 628 3500 3200 625 3500 3150 638 35OO 3100 652 3500 3100 37,000 18,419 3500 60 3500 3200 I 1233 3500 24 614 3500 3170 30 30 1171 3500 0 1519 3500 0 1599 3500 0 1352 3500 0 1605 3500 0 1457 3500 0 1605 3500 0 1511 35OO 0 1305 35OO 0 1379 35OO 0 1467 35OO 0 1269 3500 0 1159 3500 0 1134 35OO 0 1007 3500 0 1380 3500 0 1350 3500 0 1030 3500 0 1151 3500 0 1316 3500 0 1374 3500 0 1229 35OO 0 1551 3500 O 137 35OO 0 1120 35OO 0 1310 3500 0 1398 3500 0 1406 3500 0 1443 35O0 0 1540 3500 0 35O0 0 3500 0 RECEIVED DEC 1990 Alaska Oil & Gas Cons. Commission Anchorage WATER INJECTION REPORT PLATFORM A DISPOSAL WELL January-2002 A33-1 ILS A41A-I ILN A44-11 Al 1-13R2 Al 1-12 A33-14 A44-02 DATE & NOTES INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU 1~$ ]NJ ANNU INJ ]~/J ANNU INJ INJ ANNU INJ ]NJ 01-Jan-2002 0 1919 335( 577 3650 £ 0 100 IIC 361 3650 15 673 3650 0 624 3650 0 758 3650 02-Jan-2002 0 1501 340( 448 3650 £ 0 I00 1 lC 287 3650 15 535 3650 0 496 3650 O 607 3650 03-Jan-2002 20 1342 285( 481 3625 C 0 50 12(~ 68 3625 20 461 3625 0 427 3625 0 633 3625 04-Jan-2002 20 1847 325( 577 3600 C 0 50 11(~ 210 3600 20 621 3600 0 560 3600 0 776 3600 05-Jan-2002 20 1773 3425 591 3650 C 0 50 11(~ 238 3650 20 503 3650 0 656 3650 0 803 3650 06-Jan-2002 15 1911 350( 594 3650 C 0 50 110 234 3650 20 640 3650 0 626 3650 0 784 3650 07-Jan-2002 15 1952 355C595 3650 C 0 50 12(~239 3650 20673 3650 0 613 3650 0 776 3650 08-Jan-2002 15 1847 355C 589 3650 C 0 50 12(~ 241 3650 20 672 3650 0 619 3650 0 766 3650 09-Jan-2002 15 1856 355C 592 3650 0 0 50 !10 241 3650 20 678 3650 0 621 3650 0 773 3650 10-Jan-2002 20 1813 355C 595 3650 0 0 100 120 245 3650 20 678 3650 0 622 3650 0 766 3650 I l-Jan-2002 20 1783 360( 596 3650 0 0 100 120 255 3650 20 680 3650 0 627 3650 0 778 3650 12-Jan-2002 20 1750 360( 571 3650 0 0 100 120 243 3650 20 674 3650 0 617 3650 0 760 3650 13-Jan-2002 20 1710 360( 567 3650 0 0 100 120 241 3650 20 659 3650 0 602 3650 0 703 3650 14-Jan-2002 20 1708 360(584 3650 0 0 100 120 244 3650 20656 3650 0 594 3650 0 677 3650 15-Jan-2002 20 1672 360( 550 3650 0 0 100 120 239 3650 20 656 3650 0 597 3650 0 723 3650 16-Jan-2002 40 1552 355£ 533 3600 0 0 100 120 267 3600 20 598 3600 0 565 3600 0 692 3600 17-Jan-2002 20 1757 3575 637 3600 0 0 100 120 343 3600 25 689 3600 0 624 3600 0 793 3600 18-Jan-2002 120 251 235C 183 3600 0 0 100 120 56 3600 25 112 3600 0 123 3600 0 186 3600 19-Jan-2002 0 1821 355C 634 3650 0 0 100 120 371 3650 15761 3650 0 803 3650 0 892 3650 20-$nn-2002 0 1733 357~ 609 3650 0 0 100 120 372 3650 15 706 3625 0 667 3650 0 805 3650 2 l-Jan-2002 0 1650 360C 606 3650 0 0 100 120 379 3650 15701 3625 ( 652 3650 0 791 3650 22-Jan-2002 0 1624 3604 604 3650 0 0 100 120 383 3650 15700 3650 ( 649 3650 0 783 3650 23-Jan-2002 0 1592 360C 590 3650 0 0 75 120 383 3650 15 690 3650 ( 637 3650 0 784 3650 24-Jan-2002 0 1582 360C 578 3600 0 0 100 120 386 3600 20 691 3650 ( 639 3650 0 764 3650 25-Jan-2002 0 1572 360C 585 3600 0 0 I00 120 384 3600 20 686 3650 ( 626 3650 0 749 3650 26-Jan-2002 0 1544 360~ 592 3600 (] 0 100 100 375 3600 15 674 3650 ( 616 3650 0 740 3650 27-Jan-2002 0 1533 360~ 601 3600 0 0 100 105 372 3600 15 669 3650 ( 605 3650 0 744 3650 28-Jan-2002 0 1525 360~ 600 3600 0 0 100 IO0 367 3600 151 667 3650 ( 607 3650 0 744 3650 29-Jan-2002 0 1518 360C 599 3600 0 0 100 100 366 3600 !.' 664 3650 ( 600 3650 C~ 749 3650 30-Jan-2002 0 1503 360~ 566 3600 0 0 IO0 IO0 366 3600 1.' 663 3650 C 604 3650I 764 3650 31-Jan-2002 20 1395 350~ 543 3500 0 0 100 100 303 3500 1.~ 547 3525 ( 485 3525 684 3550 TOTAL 440 17,567 0 9,059 19,677 ! 8,403 22 747 MAXIMUM !,952 3,600 3,650 0 IO0 120 3,650 2-~ 3,650 C 3,650 (~ 3,650 AVERAGE 14 1,630 3,486 567 3,627 0 0 88 114 292 3,627 1~ 635 3,637 (~ 594 3,639 C 734 3,640 #DAYS 17 31 0 31 31 31 31 02/11/2002 WATER INJECTION REPORT PLATFORM A December-2001 DATE & NOTES 0 l-Dec-2001 02-Dec-200 ! 03-Dec-2001 04-Dec-200 ! 05-Dec-2001 06-Dec-2001 07-Dec-2001 08-Dec-200 1 09-Dec-2001 10-Dec-2001 I l-Dec-2001 12-Dec-200 ! 13-Dec-2001 14-Dec-2001 15-Dec-2001 16-Dec-2001 17-Dec-2001 18-Dec-2001 19-Dec-2001 20-Dec-2001 21 -Dec-200 I 22-Dec-2001 23-Dec-2001 24-Dec-2001 25-Dec-2001 26-Dec-200 ! 27-Dec-2001 28-Dec-2001 29-Dec-200 ! 30-Dec-2001 31 -Dec-2001 TOTAL MAXIMUM AVERAGE #DAYS I ID~sP°sn~ v~LL I A33-11LS ] A41A-IILN I A44-1' I ^,,-13~ I TM' I TM' I I 0 0 571 3625 0 950 1~ 3~ 3~ 25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1311 900 1826 1250 1918 1600 1966 1800 1914 2000 1970 2000 1960 2250 2027 2500 2024 2600 1949 2650 1972 2725 1971 2800 2001 2925 1948 3000 1922 3000 1872 3000 1897 3100 1922 3150 1951 3200 1918 3300 38,239 3,300 1,234 1,605 583 3625 592 3625 590 3625 596 3625 588 3650 593 3650 588 3650 573 3650 591 3650 580 3650 558 3650 585 3600 564 3600 562 3600 575 3600 569 3600 564 3600 547 3600 549 3600 571 3600 577 3600 572 3600 560 3650 568 3650 580 3650 573 3650 551 3650 562 3650 0 577 3650 571 3650 17,780 3,650 0 57431 3,628 0 950 10( 0 950 10{ 0 950 10{ 460 1700 10( 0 700 8( 319 1750 9{ 522 1700 6( 691 ! 750 8{ 0 300 8{ 0 1300 5f 574 1500 9{ 260 ! 500 6( 0 350 8f 0 300 10( 0 250 10( 0 200 10( 0 150 10( 0 0 100 10( 0 100 10( 0 100 11£ 0 100 IIC 0 100 lie 0 I00 11~ 0 100 IIC 0 100 11~ 0 100 IIC 0 100 !1(3 0 100 IH3 0 100 11~ 0 100 11{~ 2,826 1,750 110 91 598 96 01/15/2002 333 3600 25 368 3600 25 329 3600 25 286 36O0 25 280 3650 2C 282 3650 2C 291 3650 2C 336 3650 2£ 369 3650 2C 375 3650 2C 393 3650 15 411 3650 15 413 3650 15 413 3650 15 413 3650 397 3650 15 387 3650 15 387 3650 15 376 3650 15 371 3650 15 376 365O 15 374 3650 15 374 3650 15 367 3650 15 364 3650 15 359 3650 15 361 3650 15 355 3650 15 359 3650 15 357 3650 15 11,190 3,650 25 361 3,642 18 AIl-12 I 721 3650 25~ 717 3650 25~ 715 3650 25~ 720 3650 25~ 717 3650 20~ 704 3650 20~ 705 3650 20~ 703 3650 2~ 705 3650 18~ 691 3650 18~ 674 3650 2~ 686 3650 125 7~ 3650 5~ 693 3650 5~ 697 3650 25 6~ 3650 25 682 365O 25 676 3650 25 685 3650 ~ 680 3650 25 ~9 3650 25 678 3625 679 3650 686 3650 676 3650 676 3650 671 3650 673 3650 ~2 3650 673 3650 670 3650 21,387 3,650 250 6~ 3,~9 88 I I A33-14 INJ INJ ANNU 678 3650 5C 669 3650 5C 672 3650 5C 677 3650 5~ 673 3650 659 3650 655 3650 659 3650 658 3650 633 3650 620 3650 631 3650 664 3650 659 3650 653 3650 647 365O 631 3650 631 3650 640 3650 A44-02 INI INJ ANNU 800 3650 796 3650 789 3650 791 3650 785 3650 770 3650 777 3650 771 3650 755 3650 774 3650 765 3650 781 3650 774 3650 750 3650 758 365O 766 365O 751 3650 750 3650 735 3650 624 3650 610 3650 630 3650 634 3650 639 3650 625 3650 619 3650 624 3650 624 3650 604 3650 630 3650 621 3650 19,893 3,650 50 642 3,650 759 3650 737 3650 756 3650 758 3650 753 3650 737 3650 751 365O 763 3650 764 3650 752 3650 759 3650 752 3650 23.679 3.650 764 3,650 WATER INJECTION REPORT PLATFORM A DISPOSAL WELL November-2001 A41A- ! ILN A44-11 Al 1-13R2 A11-12 A33-14 A44-02 DATE & NOTES 1NJ INJ ANNU INJ INJ ANNU IN1 INI ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU IHJ INS 589 3650 200 759 3650 I lc 01-Nov-2001 562 3625 C 501 1600 110 260 3625 2.' 687 3625 ~0~ 02-Nov-2001 570 3625 C 0 350 110 214 3625 25 680 3625 582 3650 200 761 3650 1 lC 03-Nov-2001 557 3625 E 0 350 110 234 3625 25 683 3625 410 589 3650 220 769 3650 04-Nov-2001 558 3625 C 0 350 1 lC 230 3625 25 682 3625 400 590 3650 200 775 3650 05-Nov-2001 557 3625 C 0 350 I lC 245 3625 25 689 3625 400 599 3650 200 784 3650 10C 06-Nov-200! 556 3625 C 495 1600 11~ 244 3625 25 689 3625 410 599 3650 200 787 3650 10~ 0?-Nov-2001 549 3625 ( 0 350 !1~ 232 3625 25 683 3625 ,~10 598 3650 200 761 3650 75 08-Nov-2001 553 3625 ( 0 400 10C 249 3625 25 680 3625 375 590 3625 16(]760 3625 6C 09-Nov-2001 558 3625 ( 576 1700 10~ 284 3625 25 6?5 3625 3?5 589 3625 16~ ?69 3625 6C I 0-Nov-200 ! 554 3625 ( 0 1500 5£ 321 3625 25 680 3625 350 592 3625 150 ?81 3625 5C I I-Nov-2001 543 3625 ( 0 1500 5£ 333 3625 25 665 3625 350 573 3625 150 ?69 3625 5C !2-Nov-2001 551 3650 ( 500 1700 10( 338 3650 20 676 3650 350 588 3650 160 ??8 3650 13-Nov-2001 532 3650 0 0 700 4( 316 3650 2~ 659 3650 350 576 3650 16C ?58 3650 14-Nov-2001 553 3650 0 0 500 9( 29? 3650 25 686 3650 35C 614 3650 15{~ ?8? 3650 4C ! 5-Nov-2001 543 3650 0 0 400 10( 255 3650 25671 3650 35C ??9 3650 15C ??3 3650 16-Nov-2001 544 3650 0 0 400 10( 247 3650 25 663 3650 35C 39? 3650 15~ 7?0 3650 l?-Nov-2001 556 3650 0 0 300 100 252 3650 25 658 3650 35~ 556 3650 15C ?63 3650 3£ 18-Nov-2001 555 3600 0 0 300 110 261 3600 25 665 3600 35~ 582 3600 15C ?80 3600 19-Nov-2001 550 3600 0 465 1550 110 245 3600 25 659 3600 35{~ 578 3600 15C 774 3600 2C 20-Nov-2001 530 3600 0 0 700 80 278 3600 2~644 3600 35(~ 562 3600 15C 751 3600 2( 21-Nov-2001 544 3600 0 0 400 100 280 3600 2~ 659 3600 325 579 3600 15C 764 3600 2( 22-Nov-2001 540 3600 C 0 400 110 266 3600 23 648 3600 323 569 3600 15C ?50 3600 2( 23-Nov-2001 530 3600 C 0 350 110 291 3600 23653 3600 323 573 3600 15( 756 3600 20 24-Nov-2001 527 3600 (~ 0 350 110 297 3600 23 657 3600 323 582 3600 15( 789 3600 20 25-Nov-2001 530 3600 ~ 2050 1550 120 300 3600 2.~ 647 3600 323 567 3600 15C 782 3600 10 26-Nov-2001 556 3600 (~ 230 1400 50 242 3600 2.~ 627 3600 373 588 3600 20( 747 3600 50 27-Nov-2001 581 3625 (~ 0 1200 80 227 3600 2: 745 3650 25C 737 3650 5( 831 3650 0 28-Nov-2001 573 3625 g 0 950 100 222 3600 2.~ 738 3650 25( 698 3650 5f 829 3650 0 29-Nov-2001 555 3625 ~ 510 1600 10(] 207 3600 251 720 3650 25C 681 3650 5( 810 3650 0 30-Nov-2001 571 3625 (~ 578 1600 loC 328 3600 25: 721 3650 25( 675 3650 50 798 3650 0 TOTAL 16,538 5,905 7,995' 20,289 17,971 23,265 MAXIMUM 3,650 g !,700 120 3,650 25 3,650 410 3,650 220 3,650 110 AVERAGE 551 3,623 g 197 880 96 267 3,619 25 676 3,626 348 599 3,632 152 776 3,632 45 # DAYS 30 9 30 30 30 30 12/12/2001 WATER INJECTION REPORT PLATFORM A DISPOSAL WELL October-2001 A34-14 ~ A4IA-I ILN A44-11 Al 1-13R2 Ali-12 A33-14 A44-02 DATE & NOTES [NJ [NJ ANNU INJ INJ ANNU INJ [NJ ANNU ~ INJ ]]~J ANNU [NJ INJ ANNU, INJ [NJ ANNU [NJ INJ ANNU Ol-Oct-2001 0 0 C 619 3600 0 490 1400 100 231 3600 2-= 706 3600 55( 570 3600 350 760 3600 02-0ct-2001 0 0 £ 630 3600 0 0 500 100 236 3600 2.= 752 3600 550i 646 3600 375 600 3600 285 03-0ct-200 ! 0 0 ¢ 637 3600 0 0 500 1 O0 254 3600 2-= 781 3600 550 672 3600 375 813 3600 250 04-0ct-2001 0 0 C 612 3600 0 450 1400 100 261 3600 2.= 764 3600 550 645 3600 300 777 3600 250 05-0ct-2001 0 0 £ 623 3600 0 0 500 100 225 3600 251 762 3600 550 644 3600 300 790 3600 250 06-0ct-200 ! 0 0 £ 625 3600 0 450 1500 100 201 3600 30 748 3600 525 625 3600 30~ 758 3600 240 07-0ct-2001 0 0 ( 634 3600 0 460 1800 100 233 3600 30 755 3600 525 640 3600 30~ 771 3600 240 08-0ct-200 ! 0 0 ( 634 3600 0 0 500 1 O0 334 3600 30 747 3600 525 624 3600 30~ 766 3600 250 09-0ct-2001 0 0 ( 627 3600 0 600 1600 100 353 3600 30 749 3600 525 634 3600 30( 766 3600 250 lO-Oct-2001 0 0 ( 615 3600 0 0 500 90 336 3600 25 746 3600 500 632 3600 30C 771 3600 275 ! l-Oct-2001 0 0 ( 623 3600 0 0 500 90 305 3600 25 721 3600 500 589 3600 30( 755 3600 275 12-0ct-2001 0 0 ( 602 3600 0 490 1600 120 242 3600 50 693 3600 520 558 3600 30( 754 3600 230 13-0ct-2001 0 0 0 606 3600 0 0 50 120 220 3600 50 678 3600 520 549 3600 30¢ 724 3600 230 ! 4-0ct-200 ! 0 0 0 598 3600 0 0 600 110 229 3600 25 697 3600 500 574 3600 30¢ 761 3600 220 15-0ct-200 ! 0 0 0 602 3600 0 1458 1700 110 221 3600 25 677 3600 500 555 3600 30( 741 3600 220 !6-0ct-200! 0 0 0 609 3600 0 250 1500 110 250 3600 25 683 3600 500 563 3600 300 752 3600 220 !7-0ct-2001 0 0 0 606 3600 0 1966 1800 110 253 3600 25 693 3600 500 573 3600 280 754 3600 210 18-0ct-2001 0 0 0 605 3600 0 629 1600 50 216 3600 30 687 3600 500 572 3600 280 745 3600 20~ 19-0ct-2001 0 0 0 593 3600 0 0 1850 70 211 3600 30 702 3600 500 599 3600 275 756 3650 19~ 20-0ct-2001 0 0 0 592 3600 0 0 750 80 255 3600 25 705 3650 450 599 3650 275 760 3650 17(~ 2 l-Oct-2001 0 0 0 611 3600 0 584 1700 100 306 3600 25 701 3625 450 596 3600 225 768 3650 160 22-0ct-2001 0 0 0 593 3600 C 0 1200 50 291 3600 25 701 3650 450 589 3650 250 752 3650 170 23-0ct-2001 0 0 0 595 3600 C 0 1200 50 300 3650 25 687 3650 450 576 3650 250 750 3650 16(~ 24-0ct-2001 0 0 0 589 3600 ¢ 0 600 10~ 334 3600 25 697 3650 450 590 3650 250 755 3650 16C 25-0ct-2001 0 0 0 572 3625 C 0 550 12(~ 335 3625 25 688 3625 450 582 3650 250 748 3650 15C 26-0ct-200 ! 0 0 0 571 3625 ( 0 500 11C 319 3650 20 695 3625 45(] 590 3650 225 769 3650 14(~ 27-0ct-2001 0 0 0 562 360 ( 534 1700 11 {~ 328 3625 20 685 3625 425 579 3650 210 768 3650 1 28-0ct-2001 0 0 (3 586 3625 ( 0 1000 7¢ 324 3625 2{~ 713 3625 40~ 602 3650 200 791 3650 11-= 29-0ct-2001 0 0 (] 577 3625 ( 0 1000 10( 293 3625 20 687 3625 420 584 3650 210 768 3650 12(~ 30-0ct-2001 0 0 {~ 586 3625 O; 0 650 11(~ 275 3625 25 693 3625 420 592 3650 210 782 3650 12(~ 3 l-Oct-200! 566 3625 0 0 350 11{~ 261 3625 2.~ 688 3625 40(~ 593 3650 200 767 3650 11 TOTAL 0 18,700 8,361 8,432 22,081 18,536 23,692 MAXIMUM 0 0 3,625 0 1,850 12¢ 3,650 5C 3,650 55{] 3,650 375 3,650 285 AVERAGE 0 0 0 603 3,500 0 270 1,052 94 272 3,608 2'/ 712 3,613 48'/ 598 3,618 277 764 3,621 202 # DAYS 0 31 12 31. 31 31 31 11/13/2001 A34-14 shut m for upcoming ng work WATER INJECTION REPORT PLATFORM A DISPOSAL WELL September-2001 A34-14 A41A-! ILN A44-1 ! Al 1-13R2 Al 1-12 A33-14 A44-02 DATE & NOTES 1NJ INJ ANNU INJ INJ ANNU INJ [NJ ANNU INJ INJ ANNU INJ ]]~J ANNU INJ ]NJ ANNU INJ INJ ANNU OI-Sep-2001 0 0 0 615 3600 ( 0 475 13£ 390 3600 2C 742 3600 60~ 565 3600 375 763 3600 31'~ 02-Sep-2001 0 0 0 611 3600 ( 0 350 13{ 395 3600 213 737 3600 60~ 562 3600 375 758 3600 03-Sep-2001 0 0 0 612 3600 ( 0 300 14( 415 3600 213 737 3600 60~ 562 3600 375 752 3600 31{ 04-Sep-2001 0 0 13 607 3600 { 0 250 14( 410 3600 213 735 3600 625 565 3600 275 763 3600 31{ 05-Sep-2001 0 0 13 618 3600 { 467 1600 13{ 416 3600 213 740 3600 625 571 3600 350 771 3600 31{ 06-Sep-2001 0 0 13 615 3600 ( 0 250 13{ 408 3600 213 735 3600 60~ 564 3600 350 771 3600 30( 07-Sep-2001 0 0 (3 620 3600 { 0 250 13{ 395 3600 2~ 737 3600 60~ 571 3600 350 755 3600 30( 08-Sep-2001 0 0 13 613 3600 0 0 250 13{ 394 3600 213732 3600 60~ 568 3600 350 765 3600 30( 09-Sep-2001 0 0 13613 3600 0 496 1500 13{394 3600 2£ 730 3600 6(E 562 3600 350 766 3600 30( lO-Sep-2001 0 0 13612 3600 0 0 250 130 363 3600 2£ 732 3600 60f 571 3600 350 779 3600 30( 1 l-Sep-2001 0 0 ~ 61 ! 3600 0 0 250 130 336 3600 2{729 3600 6(K 566 3600 350776 3600 30( 12-Sep-2001 0 0 13 608 3600 0 382 1600 130 334 3600 2{ 723 3600 60( 559 3600 350 772 3600 30( 13-Sep-2001 0 0 ~609 3600 0 527 1500 130338 3600 2{725 3600 60( 566 3600 350780 3600 30( 14-Sep-2001 0 0 £ 614 3600 0 385 1700 130 338 3600 2( 722 3600 60( 561 3600 3513 767 3600 30( 15-Sep-2001 0 0 £ 604 3600 0 0 250 130 326 3600 2{ 716 3600 60f 559 3600 3513 758 3600 30( 16-Sep-200 ! 0 0 £ 616 3600 0 280 1600 130 329 3600 20 726 3600 60( 570 3600 3513 777 3600 30( 17-Sep-2001 0 0 £ 607 3600 0 735 1600 130 339 3600 20 717 3600 60( 562 3600 3513 754 3600 29.~ 18-Sep-2001 0 0 £ 604 3600 0 0 250 130 326 3600 20 713 3600 600 555 3600 35(] 764 3600 29'. 19-Sep-2001 0 0 { 633 3600 0 1057 1600 130 302 3600 20 717 3600 600 563 3600 351] 762 3600 295 20-Sep-2001 0 0 1~ 622 3600 0 490 1550 100 280 3600 20 712 3600 600 559 3600 35(3 775 3600 290 2 I-Sep-2001 0 0 0 622 3600 0 0 ! 00 100 32 ! 3600 20 7 ! 3 3600 600 562 3600 35(] 767 3600 281 22-Sep-2001 0 0 0627 3600 0 1100 1500 120 337 3600 20719 3600 575 570 3600 35(] 774 3600 27 23-Sep-2001 0 0 01 622 3600 0 0 600 120 290 3600 20713 3600 575 564 3600 35(] 767 3600 280 24-Sep-2001 0 0 0 624 3600 13 621 1600 120275 3600 20 713 3600 575 564 3600 35(] 773 3600 280 25-Sep-2001 0 0 0 620 3600 13 440 1500 100256 3600 25 704 3600 575 556 3600 35(] 771 3600 280 26-Sep-2001 0 0 0 619 3600 13 0 500 100 255 3600 25 704 3600 575 556 3600 3513 771 3600 280 27-Sep-2001 0 0 0 622 3600 13 405 1600 100 248 3600 25 710 3600 550 565 3600 3513 781 3600 280 28-Sep-2001 0 0 0 622 3600 ' 13 0 100 100 321 3600 20 713 3600 600 562 3600 3513 767 3600 280 29-Sep-2001 0 0 0 610 3600 (] 0 500 100 257 3600 25 708 3600 550 568 3600 3512 757 3600 280 30-Sep-2001 0 0 0 618 3600 (] 440 1750 100 235 3600 25 699 3600 550 554 3600 3513 770 3600 280 i TOTAL 0 18,470 7,825 10,023 21,653 16,902 23,026 MAXIMUM 0 0 3,600 0 1,750 140 3,600 25 3,600 625 3,600 375 3,600 310 AVERAGE 0 0 0 616 3,600 0 261 904 122 334 3,600 21 722 3,600 593 563 3,600 350 768 3,600 294 # DAYS 0 30 14 30 30 30 30 10/15/2001 A34-14 shut tn for upcoming ng work WATER INJECTION REPORT PLATFORM A DISPOSAL WELL August-2001 A34- ! 4 A41A-1 ILN A44-11 A! 1-13R2 Al 1-12 A33-14 A44-02 DATE & NOTES INJ I INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INS INJ ANNU INJ INJ ANNU 01-Aug-2001 0 1600 1600 613 3600 12 0 700 10C 268 3600 20 822 3600 600 550 3600 35{ 751 3600 26~ 02-Aug-2001 0 1610 1610 613 3600 13 0 700 10C 273 3600 21] 822 3600 60(1 556 3600 3512 762 3600 282 03-Aug-2001 0 1610 1610 618 3600 12 0 700 loc 274 3600 21] 817 3600 60(1 562 3600 3512 760 3600 282 04-Aug-2001 0 1440 1440 621 3600 C 491 1700 12£ 279 3600 21]818 3600 60(1 565 3600 35C 761 3600 282 05-Aug-2001 0 1400 1400 606 3600 12 0 150 12£ 273 3600 21] 810 3600 600 559 3600 35£ 756 3600 282 06-Aug-200 ! 0 1370 1370 620 3600 { 0 150 12£ 283 3600 21] 806 3600 6013 559 3600 3512 748 3600 29~ 07-Aug-2001 0 1360 1360 620 3600 12 0 150 1212 283 3600 213 799 3600 60~ 553 3600 37.~ 749 3600 295 08-Aug-2001 0 1360 1360 618 3600 12 50 1500 12(} 276 3600 213 796 3600 600 558 3600 35{ 756 3600 295 09-Aug-2001 0 1360 1360 618 3600 12 2160 1600 12.0 281 3600 213 797 3600 6013 558 3600 35{ 752 3600 295 10-Aug-200 ! 0 1400 1400 617 3600 ~ 1301 1800 120277 3600 2t2 785 3600 60t3 551 3600 40( 746 3600 3OC I l-Aug-2001 0 1400 ! 400 629 3600 0 378 1600 120 298 3600 2{2 831 3600 6012 618 3600 40( 783 3600 3OC 12-Aug-2001 0 1400 140~ 613 3600 0 367 1600 120 289 3600 2£ 813 3600 60(3 586 3600 400 763 3600 29C 13-Aug-200 ! 0 1400 140~ 514 3600 0 0 150 120 240 3600 212 643 3600 55C 505 3600 260 662 3600 2612 14-Aug-2001 0 1400 14OC 608 3600 0 0 150 120 343 3600 2{ 792 3600 55C 600 3600 260 823 3600 26( 15-Aug-2001 0 1400 14012 602 3600 0 415 1500 120 272 3600 2{ 804 3600 55£ 607 3600 260 799 3600 26( 16-Aug-2001 0 100 10C 61 ! 3600 0 0 150 120 293 3600 2( 801 3600 60( 604 3600 350 805 3600 28~ 17-Aug-2001 0 100 loc 607 3600 0 0 150 120 304 3600 20 794 3600 60( 600 3600 350 783 3600 28~ 18-Aug-2001 0 0 12 616 3600 0 0 150 120 318 3600 40 795 3600 60( 603 3600 350 787 3600 29~ 19-Aug-2001 0 0 C 613 3600 0 0 150 120 307 3600 20 791 3600 600 592 3600 350 780 3600 29¢ 20-Aug-200 ! 0 0 C 614 3600 0 520 1500 120 305 3600 20 777 3600 600 581 3600 350 768 3600 29{ 21-Aug-2001 0 0 12 597 3600 0 0 150 1213 331 3600 20 762 3600 600 567 3600 350 752 3600 30( 22-Aug-2001 0 0 12 601 3600 I] 0 150 1213 350 3600 20772 3600 600 582 3600 350770 3600 31( 23-Aug-2001 0 0 0 599 3600 I~ 493 1500 140 348 3600 20 755 3600 600 559 3600 400 754 3600 32( 24-Aug-2001 0 0 0 611 3600 1] 430 1500 121] 336 3600 20 761 3600 600 576 3600 375 748 3600 33( 25-Aug-2001 0 0 0 614 3600 13 611 1600 10(3 317 3600 20 755 3600 600 570 3600 375 755 3600 321 26-Aug-2001 0 0 0 610 3600 1] 0 550 1213 349 3600 20 753 3600 600 566 3600 375 752 3600 33 27-Aug-2001 0 0 0 607 3600 13 0 400 1213 337 3600 20 748 3600 600 565 3600 375 754 3600 330 28-Aug-2001 0 0 0 609 3600 13 320 1500 1313 346 3600 20 746 3600 650 564 3600 400 763 3600 340 29-Aug-2001 0 0 0603 3600 13 0 700 1213 361 3600 20737 3600 650 556 3600 375763 3600 320 30-Aug-2001 0 0 0 615 3600 13 456 1500 1313360 3600 20 744 3600 625 566 3600 375 773 3600 320 3 l-Au~-2001 0 0 0 615 3600 13 0 400 13C 381 3600 20 747 3600 625 569 3600 375 774 3600 320 TOTAL 0 18,872 7,992 9,552 24,193 17,707 23,652 MAXIMUM 1,610 1,610 3,600 (1 1,800 140 3,600 40 3,600 650 3,600 400 3,600 340 AVERAGE 0 700 700 609 3,600 0 258 845 Il9 308 3,600 21 780 3,600 600 571 3,600 356 763 3,600 298 # DAYS ! 1 31 13 31 31 31 31 09/12/2001 ~,34-14 shut m for upcomxng ng work WATER INJECTION REPORT PLATFORM A DISPOSAL WELL July-200 ! A34-14 A41A-I ILN A44-11 Al 1-13R2 Al 1-12 A23-01R A33-14 A44-02 DATE & NOTES INJ INJ ANNU INI INJ ANNU INJ INJ ANNU INJ IN,,' ANNU INJ INJ ANNU INJ INJ ANNU INS INJ ANNU INJ INS ANNU 01-Jul-2001 0 1600 1700 554 3600 ( 931 1500 9{ 305 3600 20 !149 3600 450 0 0 { 585 3600 25{3 769 3600 13- 02-$ul-2001 0 50 100 550 3600 { 1213 1600 5£ 309 3600 2{] 1112 3600 450 0 0 ( 580 3600 25(3 751 3600 135 03-Jul-2001 0 250 220 551 3600 ( 468 1800 8£ 321 3600 2{3 1096 3600 450 0 0 { 582 3600 25(3 738 3600 14(3 04-Jul-200 ! 0 350 340 551 3600 0 0 0 8{ 322 3600 2{3 1083 3600 450 0 0 ( 578 3600 25(] 741 3600 145 05-Jul-2001 0 490 470 556 3600 0 0 0 6( 323 3600 2{3 1072 3600 475 0 0 ( 573 3600 250 740 3600 15{3 06-Jul-2001 0 500 470 561 3600 0 667 1800 100 311 3600 2{] 1045 3600 50~ 0 0 ( 573 3600 25{3 732 3600 158 07-Jul-2001 0 500 550573 3600 0 0 0 100 314 3600 2{3 1036 3600 500 0 0 ( 571 3600 30~ 733 3600 175 08-Jul-2001 0 650 660 57 ! 3600 0 0 0 110 312 3600 2C ! 022 3600 50~ 0 0 0 569 3600 30~ 747 3600 184 09-Jul-2001 0 800 800 566 3600 0 381 1650 110 312 3600 2¢ 1007 3600 500 0 0 0 569 3600 300 737 3600 187 lO-Jul-2001 0 910 91{3 574 3600 0 0 0 110 315 3600 2£ !010 3600 525 0 0 0 574 3600 30~ 756 3600 191 1 l-Jul-2001 0 !000 1020 571 3600 0 444 1700 110 314 3600 2£ 1013 3600 525 0 0 0 594 3600 30~ 768 3600 19{ 12-Jul-2001 0 1000 I10~ 572 3600 0 367 1600 110 331 3600 2£ 1047 3600 50~ 0 0 0 640 3600 25~ 746 3600 18~ 13-Jul-2001 0 1200 120~ 563 3600 0 0 0 110 320 3600 2( 1003 3600 50~ 0 0 0 603 3600 25{3 727 3600 184 14-Jul-2001 0 1250 126(] 575 3600 0 0 0 110 313 3600 2( 1002 3600 50~ 0 0 0 603 3600 25C 738 3600 184 15-Jul-2001 0 1300 130~ 574 3600 {3 378 1850 110 314 3600 20 997 3600 50~ 0 0 0 607 3600 25{~ 762 3600 184 16-Jul-2001 0 ! 350 ! 37C 572 3600 {3 405 1800 110 295 3600 20 978 3600 50( 0 0 0 595 3600 30( 777 3600 184 17-Jul-2001 0 1400 140~ 573 3600 {3 0 0 110 303 3600 20 971 3600 50( 0 0 0 597 3600 30( 781 3600 184 18-Jul-2001 0 1400 140( 578 3600 {3 0 0 110 266 3600 20 971 3600 50( 0 0 {3 605 3600 30( 779 3600 22( 19-Jul-2001 0 1440 144£ 582 3600 (3 405 1600 11{3 244 3600 20 964 3600 50( 0 0 {3 610 3600 30( 768 3600 21[ 20-$ul-2001 0 1460 146{ 480 3600 {3 375 1600 !10 206 3600 20 793 3600 500 0 0 {3 494 3600 30( 625 3600 21{ 21-Jul-2001 0 1480 1480! 633 3600 ~ 0 0 IlG 277 3600 20 872 3600 500 0 0 G 589 3600 27.~ 780 3600 17{ 22-Jul-2001 0 1500 1500 634 3600 C 362 1500 11{3 292 3600 20 885 3600 500 0 0 {3 567 3600 300 770 3600 20[ 23-$u1-2001 0 1520 1520 600 3600 £ 0 0 11{3 285 3600 20 863 3600 500 0 0 {3 555 3600 300 736 3600 22~ 24-Jul-2001 0 1540 1540 599 3600 C 0 0 1 !{~ 286 3600 20 858 3600 500 0 0 (3 557 3600 325 723 3600 230 25-Jul-2001 0 1560 1560 621 3600 £ 407 1500 11(3 281 3600 20 866 3600 550 0 0 £ 565 3600 350 772 3600 239 26-Jul-2001 0 1570 1570 628 3600 C 0 0 12(3 278 3600 20 849 3600 575 0 0 C 556 3600 350 771 3600 246 27-Jul-2001 0 1590 1590 635 3600 C 405 1400 12{3 276 3600 20 849 3600 600 0 0 £ 558 3600 350 775 3600 252 28-Jul-2001 0 1600 1600 627 3600 ( 0 0 12C 273 3600 2{3843 3600 600 0 0 £ 557 3600 350 773 3600 258 29-Jul-2001 0 1600 1600 626 3600 (~ 0 0 12C 280 3600 2{3 838 3600 600 0 0 C 567 3600 350 764 3600 254 30-Jul-200 ! 0 1600 1600 623 3600 {~ 0 0 12~ 270 3600 2{3 835 3600 600 0 0 C 547 3600 350 762 3600 258 3 l-Jul-2001 0 1600 1600 631 3600 0 440 1500 12£ 262 3600 2{3 840 3600 600 565 3600 350 778 3600 260 TOTAL 0 18,104 7,648 9,110 29,769 0 17,885 23,319 MAXIMUM 1,600 !,700 3,600 0 !,850 12{3 3,600 20 3,600 600 0 (3 3,600 350 3,600 260 AVERAGE 0 !,163 1,172 584 3,600 0' 247 787 105 294 3,600 20 960 3,600 515 0 0 (3 577 3,600 295 752 3,600 199 Ct DAYS ! I 31 15 31 31 0 31 31 08/14/200 I A23-01R shut tn as tt ts now being converted to a producer A34-14 shut tn for upcomn WATER IN:ECTION REPORT PLATFORM A DISPOSAL WELL June-2001 A34-14 A41A-! ILN A44-1 ! A11-13R2 Al 1-12 A23-01R A33-14 A44-O2 DATE & NOTES INJ INJ ANNU INJ INS ANNU IN: INJ ANNU INJ INJ ANNU IN: 174I ANNU INJ IN: INJ INJ ANNU INJ INJ ANNU 01-Jun-2001 960 3650 365( 502 3650 (1 0 0 loc 342 3650 15 0 1750 900 0 0 0 648 3650 100 791 3650 02-:un-2001 949 3650 365( 510 3650 (1 290 1600 12(1 368 3650 15 0 1750 900 0 0 0 650 3650 10( 777 3650 03-:un-2001 960 3650 365( 505 3650 (1 425 1600 8(1344 3650 150 1750 900 0 0 0 658 3650 10(801 3650 04-:un-2001 948 3650 365( 491 3650 (1 300 1600 8(] 355 3650 15 0 1750 900 0 0 0 655 3650 10( 772 3650 14 05-Jun-2001 674 3250 325{ 518 3650 (] 0 0 loc 346 3650 15 0 1750 900 0 0 0 633 3650 10( 760 3650 06-:un-2001 892 3650 365{ 499 3650 (] 0 0 8(] 306 3650 20 0 1750 900 0 0 0 584 3650 200 756 3650 07-:un-2001 903 3650 365{ 516 3650 (] 0 0 10(1 291 3650 15 0 1750 900 0 0 0 595 3650 150 749 3650 42 08-Jun-2001 898 3650 365{ 524 3650 (] 853 1750 i 11] 314 3650 15 0 1750 900 0 0 0 602 3650 65 740 3650 41~ 09-:un-2001 893 3650 3651) 535 3650 1] 0 0 105 321 3650 15 0 1750 900 0 0 0 600 3650 70 745 3650 lO-Jun-2001 897 3650 3650 549 3650 1] 0 0 6~ 326 3650 15 0 1750 90(1 0 0 0 600 3650 175 749 3650 1 I-:un-2001 578 3650 3650 533 3650 1] 384 1550 ! !( 328 3650 15 358 1750 900 0 0 0 607 3650 175 750 3650 ! 2-Jun-2001 0 2475 2475 506 3650 t~ 0 0 11( 365 3650 2(] 1116 3225 40(I 0 0 0 652 3650 60 765 3650 13-:un-2001 0 2200 2300 510 3650 C 1941 1600 10( 336 3650 2(] !179 3175 39E 0 0 0 656 3650 125 793 3650 14-:un-2001 0 2200 2200 469 3650 ( 595 1800 10( 342 3650 2E 1459 3400 25(1 0 0 0 647 3650 100 783 3650 I~J 15-Jun-2001 0 2150 2150 485 3650 ( 0 0 10( 349 3650 21]1392 3400 25E 0 0 0 642 3650 100767 3650 16-Jun-2001 0 1100 1200 502 3650 ( 0 0 10( 355 3650 21] 1338 3450 30(1 0 0 0 657 3650 !130 792 3650 17-:un-2001 0 1800 1850 500 3650 { 370 1800 10( 354 3650 21] 1294 3450 30(1 0 0 (~ 661 3650 100 803 3650 18-:un-2001 0 900 950 505 3650 { 0 0 10( 354 3650 21] 1268 3475 30(1 0 0 (1 662 3650 1130 791 3650 Ic. 19-Jun-2001 0 900 950 512 3650 { 344 1700 10( 367 3650 21] 1240 3475 30( 0 0 (1 660 3650 loc 763 3650 It. 20-Jun-2001 0 900 1800 526 3650 ( 1319 1700 6(365 3650 21]1207 3475 30( 0 0 (1 645 3650 loc767 3650 I 2 I-:un-2001 0 900 1650 512 3650 0 1232 1500 60 299 3650 2£ 1025 3450 ,lOC 0 0 (] 520 3650 20(1 707 3650 2( 22-:un-200 ! 0 ! 100 110~ 535 3650 0 406 1500 60 302 3650 2( 1068 3500 40( 0 0 (] 570 3650 20(1 760 3650 2{ 23-:un-2001 0 1650 165(] 551 3600 0 0 0 60 320 3600 2( 1066 3450 40( 0 0 (] 571 3600 20(1 774 3600 24-Jun-2001 0 !100 IIOC 545 3600 0 354 1500 60 312 3600 2( 1081 3500 dOC 0 0 1] 577 3600 20(] 781 3600 90 25-:un-2001 0 1100 547 3600 0 0 0 80 307 3600 2{ 1059 3500 dOC 0 0 (] 572 3600 20(1 762 3600 96 26-:un-2001 0 1850 185(1 568 3600 0 290 1300 80 307 3600 2(1059 3500 40( 0 0 1] 574 3600 225770 3600 ! !0 27-:un-2001 0 1850 185E 573 3600 0 816 1500 80 308 3600 2( 1039 3500 40( 0 0 (] 572 3600 25E 750 3600 130 28-.Iun-200 ! 0 1850 180(1 562 3600 0 816 1550 100 286 3600 2{ 1130 3550 50( 0 0 1] 569 3600 251~ 763 3600 140 29-:un-2001 0 500 75(] 553 3600 0 1327 1550 60 287 3600 2( 1173 3600 45( 0 0 ¢ 573 3600 251~ 758 3600 135 30-Jun-2001 0 500 6OC 552 3600 0 0 0 60 292 3600 2( 1167 3600 45( 0 0 1] 590 3600 225 774 3600 125 T(JTAL 9,552 15,695 ! 2,062 9,848 22,718 0 18,402 23,0 ! 3 MAXIMUM 3,650 3,650 3,650 0 1,800 120 3,650 20 3,600 9OC 0 (1 3,650 250 3,650 140 AVERAGE 3 ! 8 2,226 2,26~ 523 3,637 0 402 903 87 328 3,637 18 757 2,831 563 0 0 (] 613 3,637 14'/ 767 3,637 53 ,'9 DAYS 11 30 17 30 20 0 30 30 07/10/2001 A23-01R shut ~n as ~t ~s now being converted to a producer a.34-14 shut m for upcoming ng work WATER INJECTION REPORT PLATFORM A DISPOSAL WELL May-200 ! A34-14 A41A-I ILN A44- ! 1 Al 1-13R2 Al 1-12 A23-OIR A33-14 A44-02 DATE & NOTES INJ INJ ANNU 1NJ INJ ANNU INJ INJ ANNUI INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ 01-May-200i ' ' ' 975 3650 3650 564 3625 ( 0 50 90 362 3650 12 0 1775 900 0 1150 115C 652 3650 .~ 800 3650 02-May-2001 978 3650 3650 566 3650 0 0 50 80 406 3650 lC 0 1775 890 0 ! 150 115C 659 3650 C 795 3650 03-May-2001 988 3650 3650 579 3650 0 0 50 80 421 3650 lC 0 1800 900 0 ! 150 115£ 666 3650 C 800 3650 04-May-2001 964 3650 3650 565 3650 0 0 50 80 405 3650 lC 0 1775 900 0 ! 150 115£ 654 3650 { 784 3650 05-May-2001 970 3650 3650 538 3650 0 0 50 90 395 3650 lC 0 1775 900 0 1150 115£ 644 3650 C 819 3650 06-May-2001 954 3650 365C 551 3650 0 0 50 90 382 3650 lC 0 1775 900 0 1150 115C 633 3650 ( 819 3650 07-May-2001 967 3650 365C 550 3650 0 0 50 90 363 3650 lC 0 1775 900 0 1150 115C 641 3650 C 820 3650 08-May-200 ! 950 3650 365(~ 475 3650 0 0 50 90 335 3650 lC 0 1775 900 0 550 41C 632 3650 C 786 3650 09-May-2001 947 3650 365~ 480 3650 0 0 50 90 333 3650 lC 0 1775 900 0 300 14C 634 3650 C 781 3650 10-May-2001 952 3650 365C 483 3650 0 0 50 90 357 3650 !( 0 1775 900 0 300 88C 630 3650 2( 823 3650 I 1-May-2001 953 3650 365C 476 3650 0 0 50 90 377 3650 10 0 1750 900 0 0 f 637 3650 2( 824 3650 12-May-2001 952 3650 365(~ 535 3650 0 0 50 90 377 3650 10 0 1750 900 0 0 C 629 3650 2( 823 3650 13-May-2001 949 3650 365(~ 535 3650 0 0 50 90 374 3650 10 0 1750 900 0 0 C 628 3650 2( 815 3650 14-May-2001 954 3650 365C 518 3650 0 0 50 90 376 3650 10 0 1750 900 0 0 C 624 3650 2( 808 3650 15-May-2001 948 3650 365C 498 3650 0 0 50 90 364 3650 10 0 1750 900 0 0 { 613 3650 2( 806 3650 16-May-2001 954 3650 365£ 503 3650 0 0 50 90 351 3650 10 0 1750 900 0 0 { 622 3650 20 81 ! 3650 ! 7-May-2001 956 3650 365£ 526 3650 0 0 50 90 362 3650 15 0 1750 900 0 0 ( 625 3650 20 809 3650 18-May-200 ! 948 3650 365£ 508 3650 0 0 50 90 369 3650 15 0 1750 900 0 0 0 618 3650 20 806 3650 19-May-2001 435 3650 365£ 236 3650 0 664 1700 10~ 168 3650 15 0 1750 900 0 0 0 279 3650 20 345 3650 20-May-2001 889 3600 355C 525 3600 {~ 375 1600 140 248 3600 20 0 1750 900 0 0 0 603 3600 100 751 3600 2 l-May-2001 952 3650 365C 484 3650 C 0 50 9(] 337 3650 15 0 1750 875 0 0 0 647 3650 15 805 3650 22-May-2001 957 3650 365f 516 3650 ~ 0 50 9~ 362 3650 20 0 1750 90(3 0 0 0 659 3650 50 820 3650 23-May-2001 955 3650 365C 5 ! 8 3650 ~ 0 50 9~ 372 3650 20 0 1750 900 0 0 0 663 3650 50 837 3650 24-May-2001 840 3650 365C 447 3650 (~ 449 1700 10~ 310 3650 12 0 1750 79~ 0 0 0 573 3650 10 688 3650 25-May-2001 1005 3650 365C 489 3650 C 0 50 9~ 319 3650 15 0 1750 880 0 0 0 738 3650 5 846 3650 26-May-2001 976 3650 3650 488 3650 ~ 460 1700 225 333 3650 15 0 1750 880 0 0 0 683 3650 10 824 3650 27-May-2001 958 3650 3650 476 3650 {~ 0 50 9~ 332 3650 15 0 1750 880 0 0 0 671 3650 I 0 812 3650 28-May-2001 952 3650 365ff 484 3650 ~ 465 1700 20~ 337 3650 15 0 1750 875 0 0 0 647 3650 15 808 3650 29-May-2001 956 3650 3650 481 3650 ~ 0 50 9~ 357 3650 15 0 1750 875 0 0 0 664 3650 15 793 3650 30-May-2001 964 3650 3650 487 3650 {~ 390 1750 16~ 352 3650 15 0 1750 875 0 0 0 666 3650 15 807 3650 3 l-Ma~-2001 950 3650 3650 493 3650 75 0 50 9~ 340 3650 15 0 1750 90~ 0 0 0 667 3650 50 809 3650 TOTAL 29,048 15,574 2,803 10,876 0 0 ! 9,601 24.477 MAXIMUM 3,650 3,650 3,650 75 1,750 225 3,650 20 1,800 900 1,150 1,150 3.650 100 3,650 AVERAGE 937 3,648 3,647 502 3,648 2 90 368 101 351 3,648 13 0 1,759 891 0 297 306 632 3,648 18 790 3,648 # DAYS 31 31 6 31 0 0 31 31 06/13t2001 A23-01R shut m as ~t ~s now being converted to a producer WATER INJECTION REPORT PLATFORM A DISPOSAL WELL Aprd-200 ! A34-14 A41A-! ILN A44-11 Al !-13R2 A11-12 A23-01R A33-14 A44-02 DATE & NOTES INJ INJ ANNU INJ INJ ANNU INJ INS ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU IN! INJ ANNU INJ INJ 0 I-Apr-2001 937 3650 3650 759 3650 ( 0 200 65 369 3650 lC 0 1725 100C 0 ! 175 1175 633 3650 {3 691 3650 02-Apr-2001 978 3650 3650 778 3650 ¢ 0 200 65: 382 3650 lC 0 1725 100C 0 1175 ! 175 660 3650 (] 720 3650 03-Apr-2001 980 3650 3650 796 3650 0 0 750 20 371 3650 lC 0 1750 100~ 0 1175 1175 661 3650 (] 708 3650 04-Apr-2001 986 3650 3650 761 3650 0 0 200 60 372 3650 lC 0 1775 975 0 1175 i 175 655 3650 (] 720 3650 05-Apr-2001 992 3650 3650 0 0 0 0 200 70 379 3650 15 0 1800 925 0 1200 120~ 667 3650 (] 785 3650 06-Apr-2001 969 3650 3650 382 3600 0 0 150 80 361 3650 1-~ 0 1800 90( 0 1200 120~ 652 3650 {3 714 3650 07-Apr-2001 981 3650 3650 413 3600 0 0 ! 000 40 362 3650 15 0 1800 90( 0 1200 ! 20~ 661 3650 (] 756 3650 08-Apr-2001 981 3650 3650 397 3600 0 0 200 60 356 3650 lC 0 1800 90~ 0 1200 120(] 658 3650 {3 760 3650 09-Apr-2001 979 3650 3650 385 3600 0 0 300 60 368 3650 1( 0 1800 90( 0 1200 120(] 658 3650 {~ 760 3650 10-Apr-2001 979 3650 365(] 374 3625 0 0 150 60 365 3650 !{ 0 1800 90~ 0 1200 120~ 660 3650 (] 758 3650 ! I-Apr-2001 969 3650 365(] 337 3625 0 0 150 70 365 3650 !{ 0 1800 90( 0 1200 120~ 651 3650 {3 762 3650 12-Apr-2001 982 3650 365(] 300 3650 0 0 150 70 366 3650 !0 0 1750 9( 0 1200 !175 660 3650 {3 779 3650 13-Apr-2001 980 3650 365{3 344 3650 0 0 150 70373 3650 10 0 1750 900 0 1200 115~ 658 3650 {~ 770 3650 14-Apr-2001 983 3650 365(] 370 3650 0 0 150 70 375 3650 10 0 1750 900 0 1200 ! 15{3 663 3650 {3 758 3650 15-Apr-2001 975 3650 365{3 257 3650 0 0 75 70 379 3650 10 0 1750 900 0 ! 175 ! 175 648 3650 C 763 3650 16-Apr-2001 971 3650 365{3 305 3650 0 0 75 70 368 3650 10 0 1750 900 0 1200 !15{ 646 3650 { 789 3650 ! 7-Apr-2001 968 3650 365{3 308 3650 0 0 0 80380 3650 10 0 1750 900 0 1200 !15{ 646 3650 3~810 3650 18-Apr-2001 983 3650 365{3 3 ! ! 3650 0 0 0 80 383 3650 10 0 1750 900 0 I 150 ! 15{ 659 3650 25 809 3650 19-Apr-2001 992 3650 365£ 323 3650 0 0 0 8(] 397 3650 10 0 1750 900 0 !150 120( 671 3650 C 786 3650 20-Apr-2001 966 3650 365{ 301 3650 (] 0 0 9~ 391 3650 l0 0 1750 900 0 !150 115{ 647 3650 { 769 3650 2 I-Apr-200 ! 979 3650 365{ 3 i 2 3650 (] 0 0 9~ 392 3650 ! 0 0 1750 900 0 1150 ! 1 5{ 658 3650 ¢ 799 3650 22-Apr-2001 978 3650 365{ 324 3650 (] 0 0 9(] 397 3650 10 0 1750 900 0 1150 115{ 659 3650 ( 811 3650 23-Apr-2001 972 3650 365{ 296 3650 (] 0 0 9~ 395 3650 10 0 1750 900 0 1150 ! 15{ 649 3650 C 813 3650 24-Apr-2001 972 3650 3650 294 3650 (] 0 0 9~ 394 3650 10 0 1750 900 0 1150 !!5{ 649 3650 { 815 3650 25-Apr-2001 962 3650 3650 288 3650 {3 0 0 9(] 384 3650 10 0 1750 900 0 1150 115{ 639 3650 ( 801 3650 26-Apr-2001 978 3650 3650 298 3650 (] 0 0 85 394 3650 12 0 1775 880 0 ! 150 115{ 655 3650 .~ 798 3650 27-Apr-2001 977 3650 3650 208 3650 {~ 0 50 8~3 390 3650 10 0 1750 900 0 ! 150 ! 15{ 657 3650 813 3650 28-Apr-2001 967 3650 3650 0 3650 {3 0 50 9~ 395 3650 10 0 1750 900 0 1150 1150 651 3650 I( 815 3650 29-Apr-2001 981 3650 3650 630 3600 (~ 0 50 9~ 393 3650 I(] 0 1775 900 0 1150 1150 655 3650 795 3650 30-Apr-2001 973 3650 3650 581 3625 (3 0 50 9~ 371 3650 15 0 1775 900 0 1150 1150 652 3650 5! 785 3650 TOTAL 29,270 11,432 0 ! 1,367 0 0 19.638 23.212 MAXIMUM 3,650 3,650 3,650 (] 1,000 90 3,650 15 1,800 1,000 1,200 !,200 3,650 36i 3.650 AVERAGE 976 3,650 3,650 381 3,518 0 0 143 74 379 3,650 11 0 1,763 886 0 1.174 !,168 655 3,650 3 774 3,650 # DAYS 30 28 0 30 0 0 30 30 05/! 5/200 I A23-01R and Al 1-12 shut m to lower the pressure while we are doing a sidetrack on Al4-01 and A24-01 WATER INJECTION REPORT PLATFORM A D~POSAL WELL Ma~h-2001 A34-[4 A41A-I ILN A44-11 Al !-13R2 Al 1-12 A23~IR A33-14 A44-02 D~TE.~O~:.,S l'NJ INJ ANNU I~l INJ ANNU l~IJ l~J ANNUl [NJ [NJ ANNU [NJ [NJ ANNU [NJ [NJ AN'NU [NJ [NJ ANNU INJ [NJ 01-Mar-2001 1015 3650 365( 800 3650 0 326 1600 40 363 3650 0 0 1500 1150 0 1250 125( 741 3650 ( 742 3650 02-Mar-2001 1009 3650 365( 794 3650 0 435 1600 60 370 3650 0 0 850 1150 0 1250 12~ 722 3650 ( 733 3650 03-Mn~2001 989 3650 365( 782 3650 0 365 1600 25 386 3650 0 0 850 !!50 0 1250 125( 702 3650 ( 737 3650 04-Mar-2001 986 3650 365( 774 3650 0 453 1800 25 390 3650 0 0 1000 !150 0 1250 125( 693 3650 ( 743 3650 05-Mar-2001 999 3650 365( 789 3650 0 !170 650 25 395 3650 0 0 1000 1200 0 1250 125( 698 3650 ( 765 3650 06-Mar-2001 984 3650 365( 771 3650 0 618 1700 20 391 3650 0 0 1100 1150 0 1250 125( 674 3650 ( 710 3650 07-Mar-2001 997 3650 365( 781 3650 0 490 1700 40 321 3650 C 0 1100 1150 0 1250 125( 671 3650 ( 803 3650 08-Ma~2001 987 3650 365~ 754 3650 0 0 700 50 340 3650 C 0 900 1200 0 1250 125( 665 3650 ( 763 3650 09-Ma~2001 990 3650 3650 783 3650 ~ 370 1700 60 379 3650 ~ 0 900 1200 0 1200 12~ 673 3650 ( 748 3650 10-Mar-2001 983 3650 365~ 797 3650 ~ 0 700 50 387 3650 ~ 0 900 1200 0 1200 12~ 655 3650 ( 728 3650 Il-Mar-2001 990 3650 365( 810 3650 C 340 1800 60 394 3650 ~ 0 900 1200 0 1200 12~ 662 3650 ( 730 3650 12-Mar-2001 977 3650 3650 801 3650 0 0 700 60 377 3650 ~ 0 900 1200 0 1200 12~ 663 3650 ( 710 3650 13-Mar-2001 995 3650 3650 813 3650 ~ 924 1800 60 386 3650 ~ 0 900 1200 0 1200 12~ 674 3650 ( 731 3650 14-Ma~2001 973 3650 3650 767 3650 ~ 0 700 60 369 3650 ~ 0 900 1200 0 1200 12~ 655 3650 ( 718 3650 15-Mar-2001 993 3650 3650 784 3650 ~ 750 1800 60 379 3650 C 0 1025 1200 0 1225 122~ 675 3650 ( 760 3650 16-Mar-2001 976 3650 3650 771 3625 ~ 346 1800 40 376 3650 ¢ 0 1225 !175 0 1225 122~ 658 3650 ( 747 365"sas~. 17-Ma~2001 989 3650 3650 778 3650 ~ 423 1800 40 365 3650 ¢ 0 1225 1150 0 1225 122~ 668 3650 741 36 18-Mar-2001 987 3650 3650 789 3650 ~ 0 925 2~ 375 3650 £ 0 1225 1150 0 1225 120( 670 3650 758 365~ 19-Mar-2001 994 3650 3650 804 3650 ~ 0 875 20 390 3650 ( 0 1225 1150 0 1225 1200 676 3650 0 738 3650 20-Ma~2001 974 3650 3650 769 3625 ( 0 875 6E 368 3650 ( 0 1000 1200 0 1225 1225 657 3650 0 725 3650 21-Ma~2001 992 3650 3650 791 3625 £ 0 650 6~ 368 3650 ( 0 1000 1250 0 1225 1200 672 3650 0 745 3650 22-Mar-2001 998 3650 3650 810 3625 ( 0 650 6(] 406 3650 ( 0 1000 120~ 0 1200 1200 683 3650 0 757 3650 23-Ma~2001 996 3650 3650 811 3625 ( 424 1750 6C 407 3650 ( 0 1000 120(] 0 1200 1200 685 3650 0 763 3650 24-Mar-2001 986 3650 365~ 786 3625 ( 457 1700 6C 395 3650 ( 0 1000 120~ 0 1200 1200 669 3650 0 726 3650 25-Ma~2001 979 3650 3650 778 3625 ( 0 650 6~ 385 3650 ( 0 1000 120~ 0 1200 1200 658 3650 0 728 3650 26-Ma~200! 977 3650 3650 818 3625 ( 0 650 ~ 374 3650 ( 0 1000 120~ 0 1200 1200 656 3650 0 718 3650 27-Ma~2001 980 3650 3650 809 3625 ( 0 650 6( 385 3650 0 1000 120~ 0 1200 1200 660 3650 0 718 3650 28-Mar-2001 974 3650 3650 821 3625 ( 0 650 ~ 384 3650 ( 0 1000 120~ 0 1200 1200 656 3650 0 717 3650 29-Mar-2001 989 3650 3650 820 3650 ( 254 1700 6E 384 3650 { 0 850 1225 0 1200 1200 665 3650 0 717 3650 30-Mar-2001 978 3650 365E 769 3650 ( 0 650 65 383 3650 0 850 125C 0 1200 1200 661 3650 0 718 3650 31-M~-2001 995 3650 3650 787 3650 ( 0 400 4~ 387 3650 ( 0 1650 IIOC 0 1200 1175 668 3650 0 714 3650 TOTAL 30,631 24,511 8,145 ! 1,759 0 0 20,885 22,851 MAXIMUM 3,650 3,650 3,650 0 1,800 65 3,650 0 1,650 1~50 1,250 1~50 3,650 0 3,650 AVERAGE 988 3,650 3,650 791 3,642 0 263 1,191 49379 3,650 0 0 1,031 1,185 0 1,219 1,214 674 3,650 0 737 3,650 # DAYS 31 31 16 31 0 0 31 31 04/12/200 I A23-01R and Al 1-12 shut m to lower the p~ssure whtle we a~ doing a s~detrack on AI4~i and A2~01 WATER INJECTION REPORT PLATFORM A DISPOSAL WELL Feb~a~-2001 A3~14 A41A-I ILN A44-11 Al !-13R2 Al i-12 A23~IR AI2-12 A33-14 A44-02 ~A:TE.~NO'PF..S INJINJ ANNU INJ INJ ANNU [NJ [NJ ANNU INJ INJ ANNU [NJ INJ ANNU INJ [NJ ANNU [NJ INJ ANNU [NJ INJ ANNU INJ [NJ 01-Feb-2001 1030 3650 3650 761 3650 ( 463 1900 60 463 3650 ( 0 850 12~ 0 1300 1300 0 0 0 747 3650 C 716 3650 02-Feb-2001 1032 3650 3650 810 3650 ( 1726 1850 20 470 3650 ( 0 850 ll~ 0 1300 1300 0 0 0 750 3650 C 726 3650 03-Feb-2001 1025 3650 3650 798 3650 ( 0 950 20 460 3650 ( 0 850 ll5C 0 1300 1300 0 0 0 745 3650 ~ 721 3650 04-Feb-2001 1031 3650 3650 799 3650 ( 490 1800 50 468 3650 0 1100 il5~ 0 1300 1275 0 0 0 754 3650 E 745 3650 05-Feb-2001 1036 3650 3650 803 3650 ( 0 750 3~ 479 3650 ( 0 1000 ll6C 0 1300 1300 0 0 0 754 3650 E 725 3650 06-Feb-2001 1022 3650 3650 789 3650 ( 0 750 50 459 3650 ( 0 925 12~ 0 1300 1300 0 0 0 742 3650 0 735 3650 07-Feb-2001 1033 3650 3650 800 3650 ( 619 1800 ~ 469 3650 0 950 12~ 0 1275 1275 0 0 0 741 3650 0 726 3650 08-Feb-2001 1033 3650 3650 805 3650 ( 577 1800 40 470 3600 0 1000 list 0 1300 1275 0 0 0 744 3650 0 733 3650 09-Feb-2001 1024 3650 3650 798 3650 ( 453 1800 ~ 463 3650 ~ 0 900 12~ 0 1250 1250 0 0 0 732 3650 0 715 3650 10-Feb-2001 1020 3650 3650 795 3650 ( 0 650 40 449 3650 ~ 0 900 120¢ 0 1250 1250 0 0 0 736 3650 C 722 3650 II-Fe~2001 1027 3650 3650 780 3650 ( 433 1800 ~ 451 3650 Q 0 850 12~ 0 1250 1250 0 0 0 743 3650 C 744 3650 12-Feb-2001 1026 3650 3650 792 3650 ( 0 800 20 456 3650 0 0 1050 115£ 0 1250 1250 0 0 0 738 3650 ~ 727 3650 13-Feb-2001 1021 3650 3650 783 3650 ( 320 1850 ~ 462 3650 0 0 850 12~ 0 1250 1250 0 0 0 733 3650 ~ 714 3650 14-Feb-2001 1017 3650 3650 788 3650 0 100 ~ 441 3650 0 0 1850 105¢ 0 1250 1250 0 0 0 727 3650 ~ 712 3650 15-Feb-2001 1034 3650 365~ 815 3650 625 1750 ~ 439 3650 0 0 1650 12~ 0 1275 1275 0 0 0 738 3650 ~ 712 3650 16-Feb-2001 996 3650 365~ 762 3650 0 398 1800 5~ 425 3650 0 0 1650 12~ 0 1275 1275 0 0 0 705 3650 C 716 365~ 17-Feb-2001 1022 3650 365~ 786 3650 0 398 1800 5C 432 3650 0 0 875 12~ 0 1275 1275 0 0 0 728 3650 £ 722 365 18-Feb-2001 1004 3650 365~ 780 3650 0 375 1800 ~ 433 3650 0 0 875 120( 0 1275 1275 0 0 0 724 3650 ( 730 365~ 19-Feb-2001 1017 3650 365~ 775 3650 0 395 1800 5¢ 436 3650 0 0 875 12~ 0 1250 1250 0 0 0 719 3650 £ 736 3650 20-Feb-2001 1022 3650 365~ 782 3650 0 0 650 ~ 443 3650 0 0 875 12~ 0 1250 125~ 0 0 0721 3650 £ 707 3650 21-Feb-2001 819 3650 365~ 638 3650 0 339 1750 ~ 355 3650 0 0 775 1225 0 1275 1275 0 0 0 570 3650 C 588 3650 22-Feb-2001 1048 3650 360C 825 3650 0 389 1750 ~ 360 3650 0 0 800 12~ 0 1250 1250 0 0 0 760 3650 C 753 3650 23-Feb-2001 1010 3650 36~ 792 3650 0 0 600 ~ 339 3650 0 0 800 120( 0 1250 1250 0 0 0 728 3650 { 725 3650 24-Fe~2001 999 3650 360~ 793 3650 0 0 600 ~ 347 3650 0 0 800 12~ 0 1250 1250 0 0 ~713 3650 { 723 3650 25-Feb-2001 1013 3650 36~ 808 3650 0 394 1750 ~ 361 3650 0 0 1200 12~ 0 1250 1250 0 0 0726 3650 { 738 3650 26-Feb-2001 994 3650 365{ 814 3650 0 446 1700 ~ 360 3650 0 0 1200 12~ 0 1250 1250 0 0 0 704 3650 ( 702 3650 27-Feb-2001 774 3650 365£ 611 3650 0 339 1750 ~ 282 3650 0 0 1200 12~ 0 1250 125~ 0 0 0 546 3650 ( 559 3650 28-Feb-2001 1088 3650 365C 839 3650 0 0 600 ~ 369 3650 0 0 1200 12~ 0 1250 125~ 0 0 0 797 3650 ( 794 3650 TOTAL 28,217 21,921 9,179 I 1,841 0 0 0 20~65 20,066 MAXIMUM 3,650 3,650 3,650 0 1,900 60 3,650 0 1,850 1,225 1,300 1,300 0 0 3,650 0 3,650 AVERAGE 1,008 3,650 3,643 783 3,650 0 328 1,382 44 423 3,648 0 0 1,025 1,183! 0 1,268 1,266 0 0 0 724 3,650 0 717 3,650 # DAYS 28 28 18 28 0 0 0 28 28 03/12/200 I A23-01R and Al 1-12 shut m to lower the pressure wh~le we ~e doing a s~de~ack on Al4-01 and A24-01 RECEIVED Alaska 0~1 & Gas Cons Anchora',.,,, January-2001 DAiTB & ~OTF~ 01-Jan-2001 02-Jan-2001 03-Jan-2001 04-Jan-2001 05-Jan-200 I 06-Jan-2001 07-Jan-2001 08-Jan-2001 09-Jan-200 I 10-Jan-2001 1 l-Jan-2001 12-Jan-2001 13-Jan-2001 14-Jan-2001 15-Jan-2001 16-Jan-200 ! 17-Jan-2001 ! 8-Jan-2001 19-Jan-2001 20-Jan-2001 21 -Jan-2001 22-Jan-200 I 23-Jan-2001 24-Jan-2001 25-Jan-2001 26-Jan-2001 27-Jan-2001 28-Jan-2001 29-Jan-2001 30-Jan-2001 31-Jan-2001 TOTAL MAXIMUM AVERAGE # DAYS WATER INJECTION REPORT PLATFORM A A34-14 1027 3675 3625 1047 3675 3625 1033 3675 3625 1037 3675 3625 1043 3650 365( 1035 3650 365( 1033 3650 3650: 970 3600 3600 1031 3650 3650 1054 3650 3650 1050 3675 3675 1040 3675 3675 1034 3650 3650 1029 3675 3675 1034 3650 3650 1039 3650 3650 1036 3650 365g 1038 3675 3675 1028 3675 3675 1026 3650 3675 1039 3650 3675 1033 3650 3675 1039 3650 3675 1031 3650 3675 1026 3650 365C 1027 3650 365C 1025 3650 365f 1035 3650 365( 1032 3650 3650 1028 3650 3650 1025 3650 3650 32,004 3,675 3,675 1,032 3,656 3,653 A41A-IILN INJ INJ ANNU 778 3625 795 3625 787 3625 778 3625 795 3650 778 3650 786 3650 DISPOSAL WELL A44-11 INJ INJ ANNU 0 1000 20 0 1000 20 0 1000 20 379 1150 2{] 0 850 40 362 1200 5{3 0 830 3{3 A! 1-13R2 INJ INJ ANNU 449 3600 438 3600 437 3600 435 3600 447 3650 436 3650 411 3650 AIl-12 ] A23-01R [ A12-12 0 1300 1100 0 1325 1325 0 0 0 1300 Il00 0 1325 1325 0 0 0 1300 !100 0 1325 1325 0 0 0 1100 1130 0 1350 1350 0 0 0 1050 1130 0 1350 1350 0 0 0 1050 1120 0 1350 1350 0 0 800 3600 787 3650 794 3650 798 3625 785 3650 787 3650 789 3650 805 3650 809 3650 778 3650 804 3650 792 3650 778 3650 790 3650 777 3650 800 3650 787 3650 800 3650 799 3650 795 3650 776 3650 776 3650 776 3650 774 3650 24,453 3,650 789 3,644 1907 1150 4¢ 220 1100 2C 345 1100 4C 0 650 310 1100 6( 0 650 4~ 0 600 o ~oo 6o 0 600 70 350 1200 65 0 675 60 786 1000 70 0 700 40 384 !100 60 290 650 40 0 650 50 402 1150 60 0 6OO 6~ 0 6O0 6~ 0 6O0 6~ 0 6OO 6~ 790 1200 6~ 0 6OO 6~ 0 6OO 6~ 370 3600 407 3650 426 3650 433 3700 435 3600 427 3600 426 3600 423 3600 425 3600 427 3600 0 1100 110~ 0 1300 100(] 0 1300 1150 0 900 115{3 0 900 1175 0 900 1175 0 875 1175 0 850 1175 0 850 1175 0 850 120( 0 1350 1350 0 1325 1325 0 1325 1325 0 1350 135{3 0 1325 1325 0 1350 135{3 0 1325 1325 0 1325 1325 0 1325 1325 0 1325 1325 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6,525 1,200 70 210 855 49 415 3600 422 3600 420 3600 4O9 36OO 415 3600 423 3600 425 3600 439 3600 445 3600 447 3600 455 36O0 460 3600 458 3600 461 3600 13,346 3,700 431 3,611 0 0 900 1175 0 0 875 120( 0 0 950 117~ 0 925 1200 0 925 1175 0 875 2000 0 850 2000 0 850 1200 0 850 1200 0 850 1200 0 850 1200 0 850 1200 0 850 1200 0 850 1200 0 1,300 2,000 0 983 1,212 0 1300 1325 0 1325 1325 0 1300 130( 0 1325 132~ 0 1325 132~ 0 1300 130( 0 1300 130( 0 1300 130( 0 1300 1300 0 1300 1300 0 1300 1275 0 1300 1275 0 1300 1275 0 1300 1300 0 1,350 1,350 0 1,321 1,319 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 A33-14 A44-02 INJ XNJ ANNU INJ INJ ANNU 780 3650 742 3650 795 3650 1000 3650 778 3650 495 3650 787 3650 ~ 735 3650 788 3650 0 740 3650 788 3650 0 753 3650 768 3650 0 741 3650 682 3600 0 697 3600 768 3650 0 744 3650 807 3650 766 3650 794 3650 764 3650 780 3650 753 3650~ 768 3650 742 3650 0 764 3650 739 3650 0 765 3650 737 3650 0 772 3650 737 3650 0 770 3650 735 3650 766 3650 728 3650 759 3650 729 3650 759 3650 738 3650 769 3650 711 3650 765 3650 714 3650 765 3650 734 3650 764 3650 722 3650 750 3650 711 3650 752 3650 721 3650 ~ 750 3650 708 3650 0 764 3650 716 3650 761 3650 734 3650 755 3650 725 3650 748 3650 733 3650 23,781 3,650 767 3,648 22,744 3,650 0 73~ 3,648 0~1~2001 ~,23-01R and Al 1-12 shut in to lower the pressure whale we are doing a sidetrack on Al4-01 and A24-01 December-2000 01-Dec-2000 02-Dec-2000 03-Dec-2000 04-Dec-2000 05-Dec-2000 06-Dec-2000 07-Dec-2000 08-Dec-2000 09-Dec-2000 10-Dec-2000 1 l-Dec-2000 12-Dec-2000 13-Dec-2000 14-Dec-2000 15-Dec-2000 16-Dec-2000 17-Dec-2000 ! 8-Dec-2000 19-Dec-2000 20-Dec-2000 2 l-Dec-2000 22-Dec-2000 23-Dec-2000 24-Dec-2000 25-Dec-2000 26-Dec-2000 27-Dec-2000 28-Dec-2000 29-Dec-2000 30-Dec-2000 31-Dec-2000 TOTAL MAXIMUM AVERAGE # DAYS WATER INJECTION REPORT PLATFORM A A34-14 INJ INJ ANNU 1066 3650 365f 1055 3650 365( 1073 3650 365¢ 1062 3650 3650 1059 3650 3650 1059 3650 3650 1009 3650 3625 1041 3625 3625 1047 3650 3650 1047 3600 3600 1046 3650 3650 1024 3650 3650 1052 3650 3650 1045 3650 3650 1028 3650 3650 1041 3650 3650 1042 3650 3650 1026 3650 3650 995 3650 3650 1042 3675 3675 1079 3675 3675 1051 3675 3675 1049 3650 3650 1051 3650 3650 1043 3650 365a 1051 3650 3650 1042 3675 3675 1051 3675 3675 1033 3675 3625 1031 3675 3625 1052 3675 3625 32,392 3,675 3,675 1,045 3,654 3,648 A41A-IILN DISPOSAL WELL A44-11 25,512 3,625 823 3,621 INJ INJ ANNU INJ INJ ANNU 833 3625 528 1800 841 3625 0 650 816 3625 0 500 863 3625 0 350 835 3625 0 350 889 3625 714 1650 838 3625 0 700 857 3600 0 300 890 3625 0 200 854 3600 0 150 878 3600 448 1800 852 3625 820 1650 886 3625 0 300 769 3625 0 200 797 3600 0 100 785 3625 0 100 768 3600 848 1600 781 3625 0 250 763 3625 0i 402 1500 820 3625 0i 402 1600 840 3625 ff 0 400 810 3625 ~ 0 100 794 3625 0 379 1600 813 3625 0 345 1800 811 3625 0 0 800 815 3625 0 379 1800 820 3625 0 0 1000 788 3625 0 392 1800 790 3625 0 384 1800 815 3625 0 371 1850 801 3625 0 0 1000 6,412 0 !,850 0 207 958 13 AII-13R2 AIl-12 INJ INJ ANNU INJ INJ ANNU 4C 414 3600 0 2450 750 2C 415 3600 0 2450 750 5£ 430 3600 0 2400 75a 6C 432 3600 0 2400 75~ 6( 435 3600 0 2400 75~ 7£ 433 3600 0 2400 75~ 440 3600 0 2400 73~ 454 3625 0 2375 75a 458 3650 0 2375 75~ 65 451 3600 0 2350 75C 65 444 3600 0 2350 750 423 3650 0 2350 75C 40 430 3650 0 2350 75C 50 432 3650 0 2300 75£ 65 420 3625 0 2300 775 70 426 3600 0 2350 76( 80 434 3600 0 2350 775 40 425 3600 0 2350 775 60 396 3600 0 2325 775 20 427 3600 0 1275 1025 30 366 3600 0 2325 80( 60 368 3600 0 2325 775 60 381 3600 0 2300 80( 70 387 3600 0 2300 80( 20 393 3600 0 900 90( 20 413 3600 0 2050 1025i 20 427 3600 0 1275 10251 20 443 3600 ~ 0 1275 10251 20 446 3600 ~ 0 1275 1025 20 459 3600 0 0 1300 1100 20 468 3600 0 0 1300 1100 13,170 0 80 3,650 0 2A50 1,100 41 425 3,608 0 0 2,094 830 31 0 A23-01R INJ INJ ANNU 0 1400 1450 0 2400 1400 0 1400 1400 0 1400 1400 0 1400 1400 0 1400 1400 0 1400 1400 0 1400 1400 0 1400 1400 0 1400 140~ 0 1400 140~ 0 1400 140(] 0 1375 1375 0 1375 1375 0 1375 1375 0 1400 140(] 0 1375 1375 0 1375 1375 0 1375 1375 0 1350 1350 0 1375 1375 0 1375 1375 0 1375 1375 0 1375 1375 0 1375 1375 0 1375 1375 0 1350 135C 0 1350 135C 0 1350 135£ 0 1350 135£ 0 1325 1325 0 2,400 1,450 0 1,412 1,381 AI2-12 A33-14 INJ INJ ANNU INJ INJ ANNU 0 0 845 3650 0 0 840 3650 0 0 845 3650 0 0 823 3650 0 0 820 3650 0 0 819 3650 0 0 738 3650 0 0 797 3650 0 0 796 3650 0 0 800 3600 0 0 788 3600 0 0 775 3650 0 0 791 365O 0 0 788 3650 0 0 775 3650 0 0 787 3650 0 0 789 3625 0 0 760 3625 0 0 738 3625 0 0 802 3650 0 0 0 859 3650 0 0 ~ 826 3650 0 0 0 826 3650 0 0 0 821 3650 0 0 0 810 3650 0 0 0 812 3650 0 0 0 802 3650 0 0 0 816 3650 0 0 0 782 3650 0 0 0 781 3650 0 0 0 800 3650 24,851 0 3.650 0 802 3,644 31 0 0 0 0 A44-02 INJ INJ ANNU 835 3600 817 3650 848 3650 812 3650 778 3650 799 3625 723 3625 729 3600 745 3625 745 3600 747 3600 731 3650 ~ 756 3650 742 3650 752 3625 742 3625 756 3650 737 3650 707 3650 750 3650 791 3650 788 3650 789 3650 768 3650 780 3650 747 3650 750 3650 772 3650 737 3650 756 3650 765 3650 23,694 3.650 764 3,640 01/12/2001 A23-01R and A! !-!2 shut in Io lower the pressure whale we are doing a s~detrack on Al4-01 and A24-O1 WATER INJECTION REPORT PLATFORM A DA.TE & NO~'ES TOTAL MAXIMUM AVERAGE # DAYS 12/11/2000 A34-14 ACT I INJ INJ ANNU 1107 3650 365C 1091 3650 365C 1087 3650 365~ 1091 3650 365~ 1079 3650 365~ 793 3650 3650 358 2350 2350 1211 3650 3650 II43 3625 3625 1083 3650 3625 1084 3625 3625 1066 3650 3650 1076 3625 3625 1037 3625 3625 1055 3625 3625 1039 3625 3650 1036 3625 3625 1035 3625 3625 1036 3625 3625 1039 3625 3625 1023 3625 3625 1024 3625 3625 1087 3650 3625 1078 3650 3650 1069 3650 3650 1076 3650 3650 1079 3650 365( 1073 3650 365( 1078 3650 3637~ 1110 3650 365£ A41A-I ILN ACT [ INJ l'NJ ANNU DISPOSAL WELL A44-11 Al 1-13R2 INJ INS ANNU 31,243 3,650 3,650 !,041 3,597 3,595 929 3625 904 3625 902 3625 835 3625 878 3625 662 3625 237 1400 931 3600 956 3600 897 3625 964 3600 954 3600 953 3600 935 3625 966 3600 929 3600 944 3600 947 3600 941 3600 893 3600 924 3600 920 3600 904 3600 873 3625 909 3625 930 3625 901 3625 854 ' 3625 867 3612 5 881 3625 ACT INJ 1NJ ANNU 541 3600 568 3600 557 3600 549 3600 530 3600 387 3600 108 I!00 420 3625 453 3600 315 3600 344 3650 34O 365O 355 3625 349 3625 338 3600 336 3600 355 3600 360 3600 374 3600 362 3600 362 3600 367 3600 401 3650 413 3650 391 3650 409 3650 379 3650 384 3650 397 3600 544 3600 A11-12 INJ INJ ANNU 594 3675 15¢ 591 3675 15¢ 587 3675 15C 592 3675 150 585 3675 150 428 3675 150 0 2800 15C 0 2800 150 0 2700 550 0 2675 575 0 2650 600 0 2650 625 0 2600 630 0 2600 650 0 2600 650 0 2600 650 0 2600 675 0 2550 7OO 0 2550 700 0 2550 700 0 2525 700 0 2525 700 0 250O 725 0 2475 725 0 2475 725 0 2475 725 o 2500 725 0 2500 725 0 2475 737 ~ 599 3675 15C A23-OIR INJ INJ AN'NU 0 1500 1500 0 1500 1500 0 1500 1500 0 1500 1500 0 1500 1475! 0 1475 14751 0 1475 147~ 0 1475 147~ 0 1450 145( 0 1450 145( 0 1450 145( 0 1450 145( 0 1450 145( 0 1450 145( 0 1450 145( 0 1450 145C 0 1450 145C 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 o 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1412 5 1412 5 0 1500 1500 26,520 3,625 0 884 3,539 0 0 50 50 0 50 50 0 50 50 0 50 50 0 50 50 0 50 50 0 50 50 0 50 50 381 1600 50 0 50 45 850 1700 1( 0 125 I( 0 50 6( 507 ! 500 7( 0 i 80 6( 500 1750 6( 402 1500 6( 0 100 6C 501 1500 6( 0 100 4C 426 ! 500 6C ! 820 i 500 2( ! 200 1700 2C 0 130 2C 0 125 5C 477 1500 5C 607 1700 5C 0 100 2C 500 1600 45 924 1600 90 9,095 1,750 90 303 734 47 ! 1,988 3,650 0 400 3,533 0 3,976 3,675 738 133 2,837 518 0 1,500 1,500 0 1,452 1,451 AI2-12 ACT I INJ INJ ANNU o o o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 A33-14 ACT INJ I'NJ ANN'U 913 3650 0 903 3650 0 891 3650 0 901 3650 0 881 3650 0 644 3650 0 281 3OOO 0 1044 3650 0 947 3600 0 897 3650 0 884 3650 0 861 3650 0 865 3650 0 819 3650 0 835 3650'~0 822 36OO 0 811 3600 0 806 360O 0 804 3600 0 810 3600 0 792 3600 0 787 3600 0 888 3650 0 878 3650 0 857 3650 0 863 3650 0 866 3650 0 855 3650 0 869 3650 o 926 3650 0 25,200 3,650 0 840 3,615 0 A23-01R and Al 1-12 shut ~n to lower the pressure whale we are doing a sidetrack on Al4-01 and A24-01 RECEIVED DEC 2 1 2000 AJaska Oil & Gas Cons Commission Anchorage DA.TM & NO~B$ TOTAL MAXIMUM AVERAGE # DAYS I Ill 4/2000 A34-14 ACT I [NJ [NJ ANNU 1103 3600 360a 1107 3600 3~00 1097 3600 3600 1155 3600 3600 1129 3600 3625 1109 3600 3625 1141 3600 3625 1148 3600 3625 1149 3600 3625 1147 3600 3625 1133 3600 3625 1140 3600 360C 1127 3600 360¢ 1133 3650 365C 1119 3650 365C 1129 365O 365( 1122 3650 365( 1132 3650 365C 1109 3650 362~ 1120 3650 362~ 1112 3650 362~ 1116 3650 362~ 1105 3650 3625 1096 3650 3650 1103 3650 36501 1097 3650 3650; 1104 3650 365( 1106 3650 365( 1142 3650 365( 1110 3650 365C 1080 3650 3650! 34,720 i 29,669 3,650 3~50i 3,650 !,120 3,629 3~311 957 3,615 31 31 A41A-I I LN ACT I INJ [NJ I I 1002 3575 WATER INJECTION REPORT PLATFORM A A44-11 Al I-I 3R2 A11-12 A23-01R AI2-12 ACT ACT I Am I ACT I I ACT [NJ [NJ ~ [NJ I [NJ ~ [NJ [Nj ANNU [NJ [NJ ANNU [NJ [NJ ANN~J 0 50 100 426 3600 528 3600 25C 0 1550 1550' 0 0 1001 3575 996 3575 1015 3600 975 3600 985 3600 1013 3600 982 36O0 951 3600 946 3600 928 3600 922 3600 931 3625 981 3625 971 3625 984 3625 981 3625 980 3625 961 3650 947 3625 913 3625 885 3625 945 3625 950 3600 936 3625 959 3625 925 3625 94O 3650 881 3625 918 3625 0 50 100 o 56 10o 0 50 lOO o 50 lOO 0 50 100 0 50 100 0 50 100 0 50 10(; 0 50 10(; o 50 10(; 0 50 10(; 0 80 10C 0 50 10C 0 50 10C 0 50 0 5O 10c 0 50 10C 0 50 10C 0 50 10C 0 50 10C 0 50 10C 0 50 10C 0 50 lOC 0 50 10C 0 50 10C 223 1475 10C 0 50 7C 0 50 8C 0 50 9c 0 50 9( 223 I 15,550 1,475 100 3,625 7 97 98i 502 3~81 I 31 434 3600 436 3600 463 3500 457 3500 472 3500 522 3500 515 3500 520 3500 526 3500 519 3500 521 3600 515 3600 517 3625 491 3625 502 3625 499 3625 494 3625 508 3625 503 3625 512 3625 523 3625 519 3600 514 3600 500 3600 497 3600 519 3600 520 3600 53O 3600 544 360O 532 3600 533 3625 25(~ 530 3625 572 3650 245 563 3650 24(; 555 3650 25(~ 594 3650 25(; 600 3650 25C 603 365O 25C 603 3650 25~ 597 3650 20( 601 36OO 17-~ 593 365O 1 597 3650 18( 589 3650 200 596 3650 200 594 3650 190 595 3650 190 591 3650 200 595 3650 200 591 3650 200 597 3650 175 588 3650 175 583 3650 175 590 3650 1 50 585 3650 175 591 3675 150 593 3675 150 615 3675 150 599 3675 150 588 3675 150 18,149 3,675 250 585 3,649 200 0 1550 1550 0 1550 1550 0 1550 1550 0 1550 1550 0 1550 1525 0 1550 1500 0 1550 1500 0 1550 1500 0 1550 150o 0 1550 1500 0 1500 1500 0 1500 1500 0 1500 1500 0 1500 1500 0 1500 1500 0 1500 150(; 0 1500 150(3 0 1500 1506 0 1500 150(3 0 1500 150(] 0 1500 1500 0 1500 1506 0 1500 150(] 0 1500 150~ 0 1500 150(~ 0 150o 15o(] 0 1500 150~ 0 1500 150~ 0 1500 150(1 0 t500 150C o 1,550 1,550 0 1,518 1,500 o o 0 o o o o o o o o o 0 o 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 o o o 0 o 0 0 o 0 o 0 0 0 o 0 0 0 0 o 0 0 0 o o o o A33-14 J ACT J [NJ [NJ I ANNU . I I 924 3600 16 930 3600 16 915 3600 17 1001 3600 17 971 3600 17 948 360O 0 1019 36O0 0 1019 3600 0 1015 3600 0 1006 3600 0 992 3600 0 990 3600 0 971 3650 0 976 3625 0 957 3625 ~ 967 3650 958 3650 955 3650 0 948 3650 0 95O 3650 0 939 3650 0 949 3650 0 927 365O 0 916 3650 0 922 3650 0 914 3650 o 921 3650 0 919 3700 0 951 3650 0 926 3650 0 897 3650 0 29,593 3,700 17 955 3,631 3 31 A23-01R shut in to lower thc pressure whdc we arc dmng a mdctrack on Al4*01 and A24-01 ,'6 Au~ o ,- ~ug-20o~, ~v AU~. 20Uu Io &ug I' ,xug-*000 ' 2- ~u~-20' {~ &ug Y~00 I ~- &ug-2~IOC I ' Au~ 200v 18 ~ug Y00b 1 O- M~g- )000 2~-Au~-20, 22 Aug 9 ~- ~ug-~00'~ 24- &ug-2000 25 Aug 2000 26 4ug 200C 2g-Au~-20, 2q 4ug 2000 TOTAL M~ AVERAGE # DAYS A34-14 ACT INJ [NJ ANrNU 1128 3400 340( 1157 3450 345( 1146 3450 345C !176 3475 3475 1205 3500 350( 1197 3500 350C 1165 3500 350C 1172 3500 350C 1183 3500 3525 1254 3575 355C 1312 3600 360C 1286 3625 360C 1291 3650 365C 1273 3650 365C 661 3650 365C 1242 3450 345( 2169 3450 3495 667 3475 350( 1362 3450 349C 1362 3450 350( 1343 3450 350C 1331 3450 350C 1356 3450 350( 1433 3600 3575 1496 3650 360C 1474 3650 360C 1459 3650 360C 1452 3650 360~ 1413 3650 360C 1429 3650 360C 1404 3625 370C 39,998 3,650 3,700 1,290 3,541 3,542 WATER INJECTION REPORT PLATFORM A DISPOSAL WELL A4IA-IILN A44-11 ACT I ACT [NJ INJ ANNU l]qJ [NJ ANNU 1035 3650 1037 3650 1045 3600 1061 3625 1035 3600 1044 3625 1035 3600 1041 3625 1047 3600 1040 3600 1053 3600 1030 3600 1037 3600 1043 3600 591 3600 865 3600 1045 3450 1013 3450 1004 3450 1006 3450 1003 3450 991 3450 1018 3450 1047 3550 1087 3600 1166 3600 993 3600 1077 3600 1135 3600 983 3600 1052 3600 31,659 3,650 1,02 i 3,570 0 0 75 116 0 0 75 I!6 O 0 75 115 0 75 115 0 75 115 0 75 115 0 75 117 0 75 119 0 75 119 816 1750 !!9 0 75 120 0 75 120 0 75 120 0 75 120 0 75 120 0 75 120 0 50 119 0 50 120 0 50 120 0 50 120 0 50 120 0 50 119 0 50 120 0 50 120 0 50 !18 0 50 118 0 50 118 0 50 i16 0 50 116 0 50 i15 0 50 115 816 1,750 120 26 117 118 AIl-13R2 ACT [NJ [NJ ANNU 555 365O 552 3650 560 3650 571 3650 559 3650 564 3650 558 3650 562 3550 566 3550 564 3550 571 3550 558 3550 562 3550 570 3550 278 3550 357 3550 443 3400 447 3400 458 3400 457 3400 458 3400 458 3400 468 3400 537 3500 601 3550 608 3550 606 3550 605 3550 584 3550 588 3550 587 3700 16,412 3,700 0 529 3~42 0 A11-12 ACT INJ INJ ANNU 510 3650 500 507 3650 450 513 3650 450 51 $ 3650 450 506 3650 450 509 3650 425 502 3650 425: 506 3650 45O 5O8 3650 425 508 3650 40O 515 3650 4O0 5O2 365O 400 507 3650 400 510 3650 400 152 3650 400 322 3650 500 412 3510 400 407 3525 400 409 3510 440 413 3515 425 416 3510 415 416 3510 440 427 3505 450 505 3600 400 572 3650 350 578 3650 375 574 3650 350 575 3650 350 562 365O 35O 568 3650 350 560 3650 390 14,989 3,650 500 484 3,617 413 A23-01R AI2-12 ACT ACT INJ INJ ANNU [NJ [NJ ANNU 0 1700 1700 0 1700 170C 0 1725 1725 0 1750 170C 0 1700 170C 0 1700 170C 0 1750 170C 0 1700 170C 0 1700 170C 0 1700 170( 0 1700 170C 0 1700 170{ 0 1700 170{ 0 1700 17IX 0 1700 17IX 0 1650 165C 0 1680 16501 0 1650 1650i 0 1650 1650! 0 1650 165C 0 1650 165( 0 1650 1650i 0 1650 16501 0 1650 165C 0 1600 160C 0 1600 160C 0 1600 160C 0 1600 160{ 0 1600 160{ 0 1600 160C 0 1700 165C 0 1,750 1,725 0 1,671 1,665 0 o 0 0 o 0 0 0 0 0 o o 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 A33-14 ACT I [NJ [NJ j ANNU I 1115 3100 1141 3]50 1113 3175 1152 3175 1197 3250 0 1181 3275 0 1137 3300 1160 3325 1256 3350 1328 3400 1348 3450 1324 3450 1429 3475 1488 3525 735 3525 1159 350O 1316 3500 1085 3500 1078 3450 1129 3450 1165 3450 1129 3500 1136 3500 1320 3600 1406 3600 1366 3600 1329 3600 1297 3600 1256 3600 1248 3600 1215 36O0 37,738 0 3,6000 0 1,217 3,438 0 31 09/18/2000 A23-01R shut In to lower the pressure while we are doing a sidetrack on Al4-01 and A24-01 WATER INJECTION REPORT PLATFORM A ~,1 Jul J' Jul dOU') O{Jul ~-Jul-20' .ltd 2000 ;,6 Jul 09 Jul 2000 -Jul- 2-Jul-20hcl Kd 2000 ~ Jul a000 o-Jul-2oO0 :~ Jul 200U 9-Jul-)uO0 20-Jhl-20' Jul 2000 2) Jul ~-}t,l-7OOq l-h I-2u00 2> Jul 2000 % Jut 7000 2'-Jul ~000 28-JulC0t 2o Jul 2000 30 Jul ~000 TOTAL MAXIMUM AVERAGE #DAYS DISPOSAL WELL [ [ I A34-14 A4IA-I ILN A44-11 [ AII-I3R2 AII-12 I A23-01R AI2-I2 I A33-14 0 940 ,000 976 ,600 01 0 75 1021 484 3600 0 207 3650 8001 0 ,900 1900 0 0 01 0 0 0! 0 940 975 988 3600 0l 0 75 1031 470 3600 0 441 3650 8501 0 1900 1900 0 0 01 0 0 0[ 0 940 975! 0 940 975 0 920 975 0 930 975 0 920 950i 0 920 950! 0 950 920! 0 950 9201 0 950 920 0 910 950 0 910 950 0 910 950 0 910 950 0 910 950 0 900 950 0 900 950 34 1950 2000 244 1950 2000 307 2650 2650 469 2875 2875 478 2900 2925 491 295O 2950 482 2950 2950 631 3000 3000 794 3100 3150 924 3250 3250 929 3300 3300 1033 3350 3350 1079 3400 3350 7,895 3,400 3,350 255 i,751 1,772 974 3600 0 996 3600 0 960 3600 0 988 3600 0 983 3600 0 976 3600 0 982 3625 0 977 3600 0 978 3625 0 986 3600 0 976 3600 0 979 3600 0 975 3600 978 3600 918 3600 826 3600 909 3650 1087 3650 1070 3650 1067 3650 1045 3650 1057 3650 1045 3650 1054 3650 0 1053 3650 1058 3650 1036 3650 1049 3650 1044 3650 30,990 3,650 0 1,000 3,623 0 0 75 103 0 75 103 0 75 104 0 75 104 0 75 125 0 75 125 0 75 125 0 75 135 0 75 135 0 75 109 0 75 109 0 75 109 0 75 109 0 75 10~ 0 75 109 0 75 109 0 75 111 0 75 III 0 70 112 0 70 i12 0 70 112 0 60 114 0 60 114 0 60 115 0 75 118 0 75 118 0 75 119 0 75 117 0 75 117 0 75 135 0 73 113 481 3600 497 3600 491 3600 510 3600 506 36OO 501 3600 501 3600 495 3600 480 3600 478 3600 478 3600 475 3600 477 3600 492 3600 415 3600 348 3600 400 3600 491 3600 520 3650 534 3650 535 3650 548 3650 549 365O 557 3650 564 3650 575 3650 552 3650 557 3650 555 365O 15,516 3,650 501 3,618 445 3650 850 455 3650 850 441 3650 850 454 3650 875 454 3650 875 448 3650 875 450 3650 875 448 3650 875 445 3650 900 451 3650 900 451 3650 90O 456 3650 90O 454 3650 900 456 3650 950 388 3650 950 355 3650 950 415 3675 825 531 3675 825 533 3650 770 533 3650 730 521 3650 725 528 3650 725 520 3650 750 525 3650 700 531 3650 700 535 3650 650 510 365O 600 513 3650 550 511 3650 525 14,405 3,675 950 465 3,652 806 0 1900 190C 0 1900 190C 0 1900 190C 0 1875 1875 0 1875 1875 0 1875 1875 0 1850 185C 0 1850 185C 0 1850 185C 0 1825 1825 0 1825 180( 0 1825 1775 0 1825 1750 0 1825 1750 0 1800 1800 0 1800 1800 0 1800 1800 0 1800 1800 0 1750 1770 0 1750 1775 0 1750 1750 0 1750 1750 0 1750 1750 0 1750 1750 0 1750 1750 0 1750 1750 0 1700 1700 0 1700 1700 0 1700 1700 0 1,900 1,900 0 1,810 1,804 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 0 0 0 0 0 0 0 0 o o 0 0 o 0 0 0 o o 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 22 2000 431 2600 777 2800 979 2900 1040 3000 3,249 3,000 0 105 429 0 0810812000 A33-14 down due to annular communication problem Form 10-403 submitted to AOGCC on I 1/I 911999 Began mjectlon on 7127100 after successful ng job Form i 0-404 to be submttted within 10 days A34-14RDII down to reduce pressure on A33-14 Form 10-403 submitted to AOGCC on ! 1/19/1999 Began rejection on 7/19/00 after repair ofA33-14 Form 10-404 to be submitted within I0 days A23-OIR shut in to lower the pressure on A33-14 per Production Supenntendent Doug Marshall J uric-3000 Ol Jun 2000 02 Jun 2000 0 ~-Jun-2000 04-Jun-2000 O> .]un 2000 06 Jun 20tyO OV-Jutl-2000 08-Jun-20~ 09-ltm 20~ I 0 Jun-20t~ 1 I-Jun-20~ 12-Jun-2000 1 14-Jun 20(K~ 15-Jun-20t~) 16-J un-20~ 17-Jun 2000 1 g-Jun 20t~ 19-Jun-20~ 20-bm-2000 21 -Jun-20~ 22 Jun 23-Jun-20(~) 24-Jun-20~ 25-bm 2000 26-Jun-20t~ 27-Jun-20~ 28-Jm~-2000 29-Jun-20~ TOTAL MAXIMUM AVERAGE # DAYS 07/10/2000 WATER INJECTION REPORT PLATFORM A A34-14 ACT [NJ [NJ ANNU 0 1000 1050 0 1000 1050 0 1000 1050 0 1000 1050 0 1000 1050 0 1000 1050 0 1000 1000 0 980 1025 0 980 1025 0 980 1025 o 980 1000 0 980 1000 0 980 1000 0 970 1000 0 970 1 000 0 970 1000 0 970 ! 000 0 970 1 000 0 970 1000 0 970 1000 0 970 1000 0 960 1000 0 940 1 000 0 960 1 000 0 950 1000 0 940 1000 0 940 1 000 0 940 1000 0 940 1 000 0 940 1 000 0 1,000 1,050 0 972 1,013 A41A-I ILN ACT INJ [NJ ANNU 1055 3600 30 1051 3600 45 1058 3600 55 1038 3600 80 1042 3600 130 1045 3600 115 1028 3600 130 1034 3600 160 1028 3600 185 1041 3600 185 1030 3600 200 1026 3600 225 1022 3600 230 1036 3600 235 1034 3600 235 1008 3600 235 1008 3600 235 1004 3600 235 995 3600 235 994 3600 235 993 3600 235 985 3600 360 991 3600 358 983 3600 356 981 3600 377 984 3600 405 972 3600 417 989 3600 435 984 3600 415 980 3600 415 30,419 3,600 435 1,014 3,600 240 DISPOSAL WELL [ A44-11 I Al I-13R2 Al !-12 A23-01R I ACT [ ACT ACT I ACT [N' I [N' ~'~] [NJ I ~' I~l ~' [ ~$ ]'~l ~' ] [NJ IA~'~ 0 75 89' 491 36~ 0 489 36~ 350 1075 36~ 36~ 0 75 89 0 75 89 0 75 89 0 75 92 0 75 92 0 75 92 0 70 92 0 70 92 0 70 92 0 70 93 0 70 94 0 75 95 0 75 95 0 75 95 0 75 95 0 75 95 0 75 95 0 75 95 0 75 95 0 75 95 0 70 9'/ 0 75 98 0 75 98 0 75 9~ 0 75 10~ 0 75 10~ 0 75 102 0 75 102 0 75 102 0 75 102 0 74 95 486 3600 0 490 3600 0 484 3600 0 487 3600 0 489 3600 0 471 3600 0 462 3600 0 452 3600 0 463 3600 0 451 3600 0 440 3600 0 433 3600 0 444 3600 0 458 3600 0 459 3600 0 452 3600 0 454 3600 0 452 3600 0 457 3600 0 466 3600 0 471 3550 0 488 355O 496 355O 500 3550 509 3550 518 3550 536 3600 544 3600 548 3600 14,351 3,600 0 478 3,590 0 486 3600 350 490 3600 350 478 3600 375 477 3600 40~ 482 3600 40(1 473 3600 400 473 3675 400 472 3675 400 479 3675 400 474 3650 425 471 3650 425 469 3650 425 478 3650 425 481 3650 425 495 3650 40(] 501 3650 60~ 498 3650 58G 493 3650 58G 492 3650 68~ 492 3650 68~ 485 3650 755 489 3675 76~ 484 3675 775 482 3675 775 483 3650 79~ 478 3650 80~ 484 3650 80(3 482 3650 80~ 479 3650 80~ 14,489 3,675 800 483 3,643 551 1069 3600 360( 1078 3600 360( 1056 3600 360( 1056 3600 360( 1066 3600 360C 1041 3600 360( 1051 37O0 3625 1046 3700 3625 1060 3700 3625 1042 3700 3625 1040 3700 3625 1043 3700 3625 1060 3700 3625 1058 3700 360( 0 3700 270~ 0 2500 250( 0 2500 240( 0 2300 2300 0 2300 2200 0 2300 2200 0 22OO 2150 0 2100 2100 0 2100 2050 0 2075 2050 0 2000 2005 0 2000 2000 0 2000 1975 0 1950 1950 0 1900 1900 15,841 3,700 3,625 528 2,958 2,889 I AI2-12 A33-14 I ^CT I I I ^cT I 0 0 0 0 0 0 0 0 0 0 0 0, 0 0 0i o o 0 0 0 0 0 0 0 0 0 0 0 0 0I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1760 1760 0 1760 1760 0 1760 1760 0 1760 1760 0 1760 176( 0 1760 176( 0 1750 175( 0 1750 175( 0 1750 175( 0 1750 175( 0 1750 175C 0 1750 175( 0 1750 175C 0 1750 ~ 0 1750 0 5OO 0 400 375i 0 350 30( 0 300 28C 0 300 280 0 280 280 0 1600 1600 0 1660 1660 0 405 400 0 68 100 0 9 19 0 1600 1600 0 1600 100 0 100 160 0 1,760 1,760 0 1,241 1,188 A33-14 down due to annular commumcatnon problem Form 10-403 submItted to AOG-CC on 11/19/1999 A34-14RDH down to reduce pressure on A33-14 Form 10-403 subrmttcd to AOGCC on 11/19/1999 A23-01R shut m to lower the pressure on A33-14 per Productmn Supenntendent Doug Marshall Oil & Gas Cons. Commission 04 Ma~ 20,.. II M,~y sO00 13 Ma,,-2Ot~ I I M J) I'; M~ ZOOv 18 Ma?200o I ) M~y ~1 Ma~ ]000 2 ~ M~v 20fA) Zo Ma~ 20OO 2~ May ~000 29 Ma~ 20~0 30 May ) I -Ma~-20(R) TOTAL MAXIMUM AVERAGE #DAYS 06/1412000 A34-14 0 1100 1130 I INJ INJ ANNU INJ [NJ AN{qU INJ INJ ANNU INJ [NJ ANNU [NJ INJ ANNU INJ INJ ANNU INJ [NJ ANNU 3600 424 3600 260' 1060 3600 3575' 0 0 O' 0 1800 1821' ' 984 3575 9( 0 70 79 503 ~ 0 1050 1100 0 1050 1100 0 1060 I100 0 1040 I I00 0 1040 1100 0 1060 I100 0 1060 1100 0 1060 II00 0 1050 1 I00 0 1050 1100 0 1050 1100 0 1050 ! 100 0 1050 1100 0 1050 1100 0 1050 1100 0 1030 1075 0 1050 1050 0 1050 1050 0 I050 1050 0 1050 105~ 0 1050 1050 0 1050 1050 0 1050 1050 0 I010 105C 0 1010 105( 993 3600 105 1004 3600 989 3600 4( 974 3600 4( 937 3600 15~ 982 3550 9~ 984 3550 8~ 1005 36O0 9~ 982 3575 I000 3575 996 3575 103 992 3575 12C 993 3575 123 1000 3575 10( 987 3575 10( 1000 3575 15¢ 994 3575 15¢ 994 3575 1003 3575 15C 1008 3575 994 3575 15C 1000 3575 15C 1005 3575 1001 3600 25C 968 3600 28C 0 70 80 0 70 79 0 50 80 0 5O 8O 0 50 78 0 50 80 0 70 80 0 70 81 0 70 8 I 0 70 81 0 70 82 0 70 83 0 70 83 0 70 82 0 70 82 0 70 83 0 70 83 0 70 83 0 70 83 0 70 83 0 70 83 0 70 83 0 70 83 0 70 85 0 70 87 507 3600 520 3600 512 36O0 510 3600 387 3600 422 3600 417 3600 438 3650 458 3600 459 3600 449 3600 448 3600 459 3600 469 3600 467 3600 471 3600 474 3600 472 3600 479 36OO 482 3600 470 3600 475 3600 480 3600 476 3600 484 3600 428 3600 260 434 3600 260 428 3600 300 415 3600 300 388 3600 325 453 3600 300 461 3600 300 481 3650 300 495 3625 275 496 3625 275 489 3625 300 482 3625 3OO 486 3625 300 489 3650 300 480 3650 300 483 3625 300 482 3625 300 478 3625 300 480 3625 300 480 3625 300 470 3625 300 473 3625 3OO 473 3625 300 469 3600 340 461 360O 340 1071 3600 357~ 1083 3600 357~ 1066 3600 360( 1021 3600 360( 883 3600 3600 1009 3600 36OO I010 3600 3575! 1058 3650 355( 1057 3650 360( 1068 3650 360( 1059 3700 360( 1055 3700 360( 1063 3675 360( 1063 3675 360( 1066 3675 360( 1065 3650 360C 1063 3650 360C 1058 3650 360~ 1062 3650 360C 1065 3650 360~ 1043 3650 360~ 1052 3650 360~ 1057 3650 360C 1047 3600 3575 1035 3600 3575 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1000 105C 0 1000 105( 0 1000 104( 0 1000 !04( 0 1000 104C 0 1,100 1,130 0 1,041 i,077 0 1036 3600 25 1037 3600 45 1035 3600 65 1044 3600 35 1057 3600 lC 30,978 0 70 87 0 7O 88 0 7O 89 0 70 89 0 70 89 491 3600 482 3600 476 3600 497 3600 499 3600 14,633 456 3600 350 458 3600 350 457 3600 360 484 3600 360 495 3600 350 14,428 1024 3600 3575 1034 36OO 3575 1044 3600 3575 1064 3600 3575 1088 3600 3575 32,493 0 0 0 0 0 0 0 0 0 0 3,600 280 999 3.584 106 31 70 89 0 67 83 0 3,650 0 472 3,602 0 31 3,650 360 465 3,615 307 31 3,700 3,600 1,048 3,63 i 3,590 31 0 0 0 0 0 0 1800 1810 1800 1810 1760 1800 1760 1800 1750 1800 1750 1800 1750 1790 1750 1790 1750 1780 1750 1780 1750 178( 1750 178( 1750 178C 1750 178( 1750 1750 1780 1780 178C 1780 178C 1780 178C 1780 178C 1780 178C 1780 178C 1750 178C 1750 178C 1750 178C 1730 177C 1730 177C 1730 177C 1730 177C 0 1,800 1,820 0 1,760 1,785 0 A33-14 down duc to annular communlcallon problem Form 10-403 submitted lo AOC-CC on ! 1/19/1999 A34-14RDII down 1o reduce pressure on A33-14 Form 10-403 submitted to AOGCC on i !/19/1999 WATER INJECTION REPORT PLATFORM A April-2000 01 -Apr-2000 02-Apr-2000 03-Apr-2000 04-Apr-2000 05-Apr-2000 06-Apr-2000 07-Apr-2000 08-Apr-2000 09-Apr-2000 I O-Apr-2000 II-Apr-2000 12-Apr-2000 13-Apr-2000 14-Apr-2000 15-Apr-2000 16-Apr-2000 17-Apr-2000 18-Apr-2000 19-Apr-2000 20-Apr-2000 21 -Apr-2000 22-Apr-2000 23-Apr-2000 24-Apr-2000 25-Apr-2000 26-Apr-2000 27-Apt-2000 28-Apr-2000 29-Apr-2000 30-Apr-2000 TOTAL MAXIMUM AVERAGE # DAYS i A34-}4~,,~) ] A41A-I {LN 0 1170 12~ 1072 3575 I0 DISPOSAL WELL A44- I I 0 70 AII-13R2 [ AIl-12 514 36OO 400 3600 2O0 0 1170 1200 0 1170 1200 0 1160 1200 0 1160 1200 0 1150 1200 0 1150 1200 0 1140 1200 o 1140 1200 0 1140 1200 0 1140 1200 0 140 1200 0 165 1170 0 160 1160 0 160 116( 0 130 II(:ff o 160 115C 0 160 115C 0 150 115C 0 150 115C 0 150 115C 150 115C 150 115C 150 115C 150 115C 150 IISC I00 113C lO0 113C 100 113C I00 1136 1017 3575 8 1060 3575 18 1039 3575 23 1088 3575 17 1067 3600 20 1075 3600 20 1053 3600 2( I058 3600 2C 1051 3600 25 1050 3600 25 1041 3600 25 1045 3600 4C 1045 3600 45 1048 3600 55 1 040 3600 35 1047 3600 33 1043 3600 3~ 1046 3600 35 1040 3600 35 1033 3600 35 1032 3600 35 1025 3600 35 1018 3600 35 1006 3600 35 0 70 7(] 0 70 78 0 70 0 70 7(~ 0 75 7(~ 0 75 75 0 75 78 0 75 78 0 75 78 0 75 78 0 75 78 0 70 79 0 75 80 0 75 81 0 75 77 0 75 77 0 75 76 0 75 77 0 75 77 0 75 77 0 75 77 0 75 77 0 75 77 0 75 77 488 3600 505 3600 494 3600 498 3600 488 3600 500 3600 490 3600 492 3600 490 3600 475 3600 463 3600 460 35OO 458 3500 467 3500 487 3510 500 3525 494 3525 469 3510 453 3510 461 3510 463 3510 467 3510 481 3510 486 3510 379 3600 200 392 3600 200 398 3600 210 494 3600 175 488 36O0 175 489 3600 200 474 3600 200 472 36O0 2O0 465 3600 200 463 3600 200 456 3600 200 451 3640 210 450 3600 21C 448 3600 225 445 3650 225 449 3650 21C 441 ~650 20C 442 3600 225 437 3600 225 439 3600 25C 439 3600 25C 437 3600 25C 436 3600 25C 432 3600 25C 1097 3600 357~ 1141 36O0 3575 I !01 3600 357~ 1143 3600 357~ I 120 3600 300C 1132 3600 360C I I I0 3600 360~ I I 14 3600 3606 1102 3600 360(] I 126 3600 360(] 1108 3600 360(] 1109 3700 360(] I08 36OO 3~90 113 3650 3600 112 3600 3600 I 17 3600 3600 103 365o 36o0 I 15 3600 360o 106 3600 3600 103 3600 3600 104 3600 3600 100 3600 3600 099 3600 3600 087 3600 3600 o I, 170 1,200 o 1,146 1,169 0 1004 3600 35 1009 3575 6(] 1002 3575 60 1002 3575 85 987 3575 90 31,143 3,600 90 1,038 3,593 35 0 75 77 0 70 77 0 70 7~ 0 70 7f 0 70 75 o 75 81 0 73 77 487 3510 497 3600 505 3600 500 3600 496 3600 14,528 3,600 484 3,558 0 431 3600 25C 0 432 3600 25C 0 431 36OO 25C 0 428 3600 25~ 424 3600 26(] 13,262 3,650 260 442 3,606 220 1082 3600 3600 1080 3600 3575 1076 3600 3575 1074 3600 3575 1060 3600 3575 33,193 3,700 3,600 1,106 3,607 3,592 o o 0 o o o o o o o o o o o o o 0 o o 0 o o 0 0 o o 0 0 o o 0 0 o 0 o o 0 0 o o o o 0 o o o o o o o o o o o o o o o o o o 0 0 0 o o] o 1800 1840 01 0 1810 1840 0 0 1800 1860 0 0 1800 1860 0 1825 1840 0 1800 1840 0 1800 1840 0 1800 184C 0 1800 184C 0 1800 184C 0 1800 184C o 18oo ~ 0 1800 0 1800 182~ 0 1775 182C 0 1800 182C 0 1800 181C 0 1800 181C 0 1800 181C 0 1800 180C 0 1800 ISOC 0 1800 lSOC 0 1800 185C 0 1800 185C 0 1800 185C 0 1800 182C 0 1800 182~ 0 1800 182~ 0 1800 182g o 1,825 1,860 0 1,800 ~ 0 05/I 0/2000 A33-14 down due to annular commumcauon problem Form 10-403 submttted to AOGCC on 1111911999 ,~34-14RDII down to reduce pressure on A33-14 Form 10-403 submitted to AC)GCC on 11/19/1999 March-2000 IA34-14 ................ ] ACT I I 0 l-Mar-2000 0 1350 ! 260 WATER INJECTION REPORT PLATFORM A DISPOSAL WELL A41A-I 1LN A44-11 I Al 1-13R2 1 ! 19 3550 0 0 75 8(3 526 3600 02-Mar-2000 03 -Mar-2000 04-Mar-2000 05-Mar-2000 06-Mar-2000 07-Mar-2000 0B-Mar-2000 09-Mar-2000 10-Mar-2000 1 l-Mar-2000 12-Mar-2000 i 3-Mar-2000 14-Mar-2000 15-Mar-2000 16-Mar-2000 17-Mar-2000 18-Mar-2000 19-Mar-2000 20-Mar-2000 21 -Mar-2000 22-Mar-2000 23-Mar-2000 24-Mar-2000 25-Mar-2000 26-Mar-2000 27-Mar-2000 28-Mar-2000 29-Mar-2000 30-Mar-2000 3 l-Mar-2000 Al 1-12 I A23-01R [ AI2-12 INJ INJ ANNU l'NJ INJ INJ INJ ANNU 482 3600 15oI 1129 3650 3600] 0 0 474 3600 15oI 1116 3600 35751 o o 411 3600 1451 1041 36oo 35751 0 0 376 3600 21oI 1143 3600 3500I 0 0 504 3600 lC}0] 1250 3600 3550] 0 0 509 3600 I0~ 1232 3600 3575' 0 0 TOTAL MAXIMUM AVERAGE # DAYS 04/12/2000 0 1260 1300 0 1270 1300 0 1260 1300 0 1260 1300 0 1260 1300 0 1240 1280 0 1240 1270i 0 1240 130( 0 1240 1275 0 1240 1300i 0 1230 1275! 0 1220 1275: o 121o 1275! 0 1210 1250i 0 1210 1275 0 1210 12501 0 1200 1250 o 12oo 1250 0 1200 1250 o 1200 1250 0 1200 1250 0 1200 1250 0 1200 1250 0 1150 1250 0 !150 1250 0 1180 1250 0 1200 1250 o 1200 1250~ 0 1180 1225 0 1170 120( o 1,35o 1,3oo o 1,219 1,265 o 1o97 3575 o 1oo7 3575 o 1517 3575 o 543 3575 o !146 3575 o i133 3575 o 1135 3575 o !1o2 3575 o i114 3600 o 11o9 3575 o 1102 3600 0 1102 3575 0 1096 3575 0 I111 3575 0 1095 3575 0 1088 3575 0 1096 3575 0 1094 3575 0 1094 3575 0 1084 3575 0 1097 3575 0 1085 3575 0 1086 3575 0 1083 3575 0 1082 3575 0 1082 3575 0 1076 3575 0 1077 3575 0 1078 3575 0 1072 3575 0 33,802 3,600 0 1,090 3,576 0 0 70 7(5 0 70 7(5 0 70 75 0 70 74 0 70 74 0 70 7(5 0 70 7(5 0 75 74 0 75 75 0 75 75 0 75 75 0 75 7(5 0 75 74 0 75 7~ 0 75 7(5 0 75 7'~ 0 75 75 0 75 75 0 75 75 0 70 75 0 70 75 0 70 75 0 72 75 0 70 75 0 70 75 0 70 75 0 70 78 0 70 75 0 70 75 0 70 7'~ o 75 80 o 72 76 o 516 3600 468 3600 397 3600 538 3600 550 3600 546 3600 544 3600 538 3500 543 3500 541 3500 532 3500 537 3500 526 3500 543 350O 527 3500 522 3500 525 3500 520 3500 525 3500 518 3500 526 3500 519 3500 521 3500 521 3500 524 3500 534 3500 524 3500 524 3500 518 36OO 517 3600 16,210 3,600 523 3,532 31 502 3600 10(3 502 3600 10(3 492 3600 125 495 3600 10~ 490 3600 125 484 3600 125 482 3600 125 476 3600 150 482 3600 150 472 3600 150 464 3625 150 465 3625 15C 456 3625 150 450 3625 15C 440 3625 125 439 3625 125 430 3625 125 424 3625 125 421 3600 170 419 3600 170 416 3600 170 408 3600 170 404 3600 170 401 3600 15~ 401 3600 145 1210 3600 3560 1207 3600 3575 1180 3525 3550 1186 3550 3575 1186 3550 3575 1175 3550 3575 !i70 3550 3575 1169 3550 3575 1184 3550 3575 !169 3650 3575 1162 3650 3575 1179 3650 3575 1176 3650 3575 1176 3650 3575 1161 3650 3575 1180 3650 3575 !166 3650 3575 i165 3650 3575 1162 3650 3550 1164 3650 3550 1193 3650 3550 1125 3650 3550 !!51 3650 3550 1147 3600 3575 1149 3600 3575 o o 0 0 o o 0 o 0 o 0 o 0 0 o o o o o o o o o o o o 0 o o o o o o o o o 0 o o o o o o o o o 0 0 o o 14,071 3,625 210 454 3,606 140 31 36,203 3,650 3,600 !,168 3,612 3,567 31 o o o o o A33-14 TM' 0 30 184( 0 33 186(~ 0 29 1856~ 0 27 18 0 27 1840] 0 30 185q 0 33 184q 0 28 185q 0 28 1840] 0 28 1840] 0 35 0 38 0 38 0 38 0 35 184C 0 35 182C 0 39 182C 0 38 182( 0 33 181( 0 34 182( 0 34 181( 0 34 181( 0 36 181( 0 36 181( ~ 0 35 180( 01 ~ 0 35 180( 0 35 180( 0 35 180( 0 28 180( 0 23 180( 0 39 1,860 o 33 isaal 0 A33-14 down due to annular commumcatlon problem Form 10-403 submitted to AOGCC on 11/19/1999 A34-14RDII down to reduce pressure on A33-14 Form 10-403 submitted to AOG-CC on 11/19/1999 RECEIVED APR 13 000 Alaska Oil & Gas Cons. Commission ~homoe DISPOSAL WELL February-2000 A34-14 A41 A- I I LN A44o I I A I I - 13R2 A I I - 12 A23-01R A 12-12 A33-14 DATE~N~.~ INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU 01-Feb-2000 0 1450 1450 1096 3575 0 0 75 77 454 3550 0 429 3600 2~ 1123 3650 3550 0 0 0 0 20 IlS0 02-Feb-2000 0 1450 1450 1104 3575 0 0 75 77 456 3550 ~ 430 3600 2~ 1124 3650 3550 0 0 0 0 20 1150 03-Feb-2000 0 1400 1440 1070 3575 0 0 70 8£ 439 3600 0[ 384 3600 2~ 1089 3600 3575 0 0 0 0 21 1170 04-1eh-2000 0 1400 1440 1088 3575 0 0 70 8C 439 3600 0[ 0 2900 370 1109 3600 3575 0 0 0 0 27 1240 0S-Feb-2000 0 1400 1425 1080 3575 0 0 70 7~ 437 3600 C 0 2850 450 1098 3600 3575 0 0 0 0 24 1180 06-Feb-2000 0 1400 1425 1089 3575 0 0 70 7~ 438 3600 C 0 2850 5~ 1106 3600 3575 0 0 0 0 24 1790 07-Feb-2000 0 1400 1425 943 3575 0 0 70 7~ 370 3600 C 469 2850 5~ 1015 3600 3575 0 0 0 0 27 184¢ 08-Feb-2000 0 1400 1425 ii05 3500 0 0 70 78 381 3550 C 474 3550 2~ 1102 3550 35~ 0 0/ ~ 0 26 1850 09-Feb-2000 0 1370 14~ II!0 3550 0 0 70 78 460 3600 C 488 3600 175 1103 3600 352~ 0 0 ~ 0 23 1860 10-Feb-2000 0 1370 14~ 1120 3550 0 0 70 78 519 3600 C 498 3600 150 1118 3600 3575 0 0 ~ 0 25 1860 II-Feb-2000 0 1360 140g 1123 3550 0 0 75 78 525 3600 C 496 3600 175 1121 3600 357~ 0 0I 0 25 1860 12-Feb-2000 0 1350 14~ 1098 3550 0 0 75 78 490 3600 C 482 3600 150 1096 3600 35751 0 0 0 25 1860 13-Feb-2000 0 1340 14~ II01 3550 0 0 75 78 483 3600 C 480 3600 15~ II00 3600 3575 0 0 ~ 0 25 18,'~ 14-Feb-2000 0 1340 14~ II01 3550 0 0 75 78 479 3600 C 481 3600 150 !107 3600 3575 0 0 C 0 25 IE 15-Feb-2000 0 1320 14~ 1064 3550 0 0 75 75 493 3600 C 482 3600 150 I!11 3600 357~ 0 0 C 0 22 18~ 16-Feb-2000 0 1320 1350 1103 3550 0 0 75 7~ 493 3600 0 474 . 3600 150 1102 3600 3575 0 0 C 0 25 18~ 17-Feb-2000 0 1320 1375 I100 3550 0 0 75 75 490 3600 ~ 471 3600 150 I101 3650 3575 0 0 C 0 25 185~ 18-Feb-2000 0 1310 1375 1105 3550 0 0 75 7& 507 3600 C 470 3600 150 1124 3650 3575 0 0 C 0 22 185~ 19-Feb-2000 0 1320 1375 1140 3575 0 0 75 78 538 3600 0 499 3650 150 1154 3650 3575 0 0 C 0 23 185C 20-Feb-2000 0 1310 1375 !121 3600 0 0 75 78 507 3600 0 490 3650 150 1131 3650 3575 0 0 C 0 28 185C 21-1cb-2000 0 1300 1375 1123 3600 0 0 75 81 518 3650 ~ 497 3650 150 1139 3650 3575 0 0 0 0 28 185C 22-Feb-2000 0 1300 1350 1725 3600 0 0 75 80 521 3600 0 498 3650 125 1137 3700 3575 0 0 ~ 0 28 185C 2~-Feb-2000 0 1300 1350 537 3600 01 0 75 80 527 3600 0 503 3650 125 1151 3650 360(~ 0 0 0 0 28 185C 2,l-Feb-2000 0 1300 1350 1122 3600 0 0 75 80 529 3600 0 497 3650 150 1137 3650 3550 0 0 0 0 28 184C 25-Feb-2000 0 1300 1350 1118 36000 0 75 80 532 3600 0 494 3650 150 1130 3650 3550 0 0 0 0 28 184C 26-Feb-2000 0 1300 1350 1121 3600 0l 0 75 80 534 3600 0 494 3650 150 1131 3650 3550 0 0 0 0 28 1840 27-~cb-2000 0 1300 1350 1114 3600 ff 0 75 80 529 3600 O 486 3650 150 1122 3650 3550 0 0 0 0 28 184~ 28-~eb-2000 0 1300 1350 1113 3600 0! 0 75 80 536 3600 0 484 3650 150 1122 3650 3550 0 0 0 0 28 1840 2O-i'eb-2000 0 1350 1260 I 110 3550 0 0 75 80 533 3600 O 481 3600 150 ! 120 3650 3550 0 0 0 0 28 1840 TOTAL 0 31,944 0 14,157 12,431 32,323 0 0 MAXIMUM 1,450 1,450 3,600 0 75 81 3,~50 0 3,650 500 3,700 3,600 0 0 28 1,860 AVERAGE 0 1,348 1,387 1,102 3,571 0 0 74 78 488 3,597 0 429 3,514 199 I,I 15 3,626 3,565 0 0 0 0 25 1,73~ # DAYS 0 29 0 29 26 29 0 0 03/09/2000 ~3-14 down due to annular commumcatton problem Form 10-403 submitted to AOGCC on I I/19/1999 ~-1-14RDIi down to reduce pressure on A33-14 Form 10-403 submated lo AOGCC on 11/19/1999 ~ WATER INJECTION REPORT PLATFORM A DISPOSAL WELL · Janua~-2000 A34-14 A41A-I ILN A44-1 I Al 1-13R2 Al 1-12 A23-01R AI2-12 A33-14 D~E & ~O~E8 [NJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ [NJ ANNU [NJ [NJ ANNU [NJ [NJ ANNU [NJ INJ ANNU [NJ INJ ANI'4U 01-Jan-2000 0 1750 1650 II10 3600 0 0 74 76 458 3500 0 441 3600 150 1151 3650 345C 0 0 C 0 0 800 02-Jan-2000 0 1750 1650 1102 3600 0 0 75 76 461 3500 0 434 3600 150 1139 3650 345C 0 0 C 0 0 80C 03-Jan-2000 0 1750 1650 1105 3600 0 0 75 76 469 3500 0 432 3600 150 1137 3650 345C 0 0 C 0 0 80C 04-Jan-2000 0 1700 1650 1094 3600 0 0 75 76 464 3500 0 426 3600 175 1135 3650 345C 0 0 C 0 0 75C 05-Jan-2000 0 1700 1650 1122 3600 0 0 75 76 490 3500 0 400 3600 175 1142 3650 345C 0 0 C 0 0 75~ 06-Jan-2000 0 1560 1575 1086 3575 0 0 70 76 485 3600 0 445 3600 170 1113 3600 3575 0 0 C 0 0 90g 07-Jan-2000 0 1550 1575 I101 3575 0 0 70 76 492 3600 0 417 3600 190 1124 3600 3575 0 0 C 0 0 900 08-Jan-2000 0 1575 1575 1098 3575 0 0 70 78 498 3600 0 415 3600 17~ 1124 3600 3575 0 0 C 0 0 900 09-Jan-2000 0 1575 1575 1098 3575 0 0 70 78 494 3600 0 369 3600 200 1122 3600 3575 0 0 C 0 0 90C 10-Jan-2000 0 1575 1575 I101 3575 0 0 70 76 501 3600 0 383 3600 220 1127 3600 3575 0 0 C 0 0 975 II-Jan-2000 0 1575 1575 1091 3575 0 0 70 76 503 3600 0 397 3600 200! 1123 3600 3575 0 0 C 0 0 90~ 12-Jan-2000 0 1575 1575 1131 3575 0 0 70 76 530 3600 0 419 3600 20C 1157 3600 3575 0 0 ~ 0 0 9.~m~5C I~-Jan-2000 0 1500 1550 1095 3600 0 0 75 76 515 3600 0 409 3600 20C 1122 3600 3600 0 0 14-Jan-2000 0 1500 1550 1113 3600 0 0 75 78 518 3600 0 416 3600 20C 1134 3600 3600 0 0 15-Jan-2000 0 1500 1550 I101 3600 0 0 75 78 504 3600 0 414 3600 20C 1127 3600 3600 0 O G 0 0 900 16-Jan-2000 0 1500 1550 1097 3600 0 0 75 78 472 3600 0 415 3600 20~ 1125 3600 3600 0 0 0 0 0 900 17-Jan-2000 0 1500 1550 1102 3600 0 0 75 78 480 3600 0 421 3600 20C 1138 3600 3600 0 0 0 0 0 900 18-Jan-2000 0 1500 1550 1095 3600 O~ 0 75 78 477 3600 O 419 3600 20C 1129 3600 3600 0 0 0 0 0 950 lO-Jan-2000 0 1500 1550 1084 3600 0 0 75 78 474 3600 0 414 3600 20~ 1115 3600 3600 0 0 0 0 0 950 20-Jan-2000 0 1450 1500 1109 3600 01 0 75 80 478 3600 Oi 424 3650 20g ii38 3650 3575 0 0 0 0 0 980 21-Jan-2000 0 1450 1500 I100 3600 C 0 75 78 484 3500 01 424 3600 20g 1132 3650 3575 0 0 0 0 0 900 22-Jan-2000 0 1425 1500 i101 3600 C 0 75 79 481 3550 C 422 3600 200 1132 3650 3575 0 0 0 0 0 890 2~-Jan-2000 0 1425 1500 1094 3600 ¢ 0 75 81 481 3550 C 420 3600 20~ 1126 3650 3575 0 0 0 0 0 890 24-Jan-2000 0 1425 1500 1091 3600 C 0 75 81 471 3550 C 417 3600 200 1119 3650 3575 0 0 0 0 0 980 25-Jan-2000 0 1420 1500 1107 3600 ¢ 0 75 79 482 3550 O! 426 3600 20~ 1136 3650 3575 0 0 0 0 0 900 26-Jan-2000 0 1420 1475 1106 3575 01 0 75 77 493 3550 0 428 3600 20C 1143 3650 3575 0 0 0 0 0 875 27-Jan-2000 0 1450 1450 1102 3575 O[ 0 75 77 482 3550 0 425 3600 20g 1132 3650 3550 0 0 0 0 0 925 28-Jan-2000 0 1450 1450 1099 3575 C 0 75 77 479 3550 0 425 3600 20~ 1129 3650 3550 0 0 0 0 0 90~ 29-Jan-2000 0 1450 1450 I101 3575 C 0 75 77 476 3550 0 429 3600 20C 1131 3650 3550 0 0 0 0 0 90~ 30-Jan-2000 0 1450 1450 1114 3575 ¢ 0 75 77 493 3550 C 434 3600 200 1142 3650 3550 0 0 0 0 0 900 31-Jan-2000 0 1450 1450 1082 3575 ~ 0 75 77 467 3550 C 420 3600 20~ 1109 3650 3550 0 0 0 O 0 950 TOTAL 0 34,132 0 15,052 12,980 35,053 0 0 MAXIMUM 1,750 1,650 3,600 0 75 81 3,600 0 3,650 220 3,650 3,600 0 0 0 980 AVERAGE 0 1,529 1,544 I, I 01 3,590 00 74 77 486 3,565 0 419 3,602 192 I, 131 3,627 3,5560 0 0 0 0 ~ss~4 # DAYS 0 31 0 31 31 31 0 0 __ 02/I 0/2000 \ ~3-14 down due to annular commumc~on problem Form 10~03 submmed to AOGCC on 11/19/1999 \ ~4-14RDii down to reduce pressure on A33-14 Form 10-403 submmed ~o AOGCC on i I/1~1999 i ~ WATER INJECTION REPORT PLATFORM A DISPOSAL WELL December-99 A34-14 A41A-I ILN A44-11 Al I-I 3R2 Al 1-12 A23-01 R Al 2-12 A33-14 DA~E &.NO'E8 INJ INJ ANNU [NJ ]NJ ANNU [NJ INJ ANNU [NJ INJ ANNU [NJ 1NJ ANNU [NJ INJ ANNU [NJ [NJ ANNU rNJ [NJ AN~U .. 0i-'~ec-~9 0 1925 1925 1117 3550 0 0 70 8~ 481 3500 0 465 3575 200 1121 3600 3475 0 0 ~ 0 0 97~ 02-Dec-99 0 1900 1900 1108 3550 0 0 70 8~ 458 3500 0 460 3575 200 IIII 3600 3450 0 0 ~ 0 0 100C 03-Dec-99 0 1900 1900 I111 3550 0 0 70 8~ 453 3500 0 463 3575 200 1120 3600 3450 0 0 C 0 0 IO0C 04-Dec-99 0 1900 1900 II10 3550 0 0 70 8~ 456 3500 G 460 3575 200 1118 3600 3450 0 0 C 0 0 05-Dec-99 0 1900 190~ il04 3550 0 0 70 8~ 463 3500 G 456 3575 200 1107 3600 345~ 0 0 C 0 0 95{ 06-Dec-99 0 1900 1900 1117 3550 0 0 70 8~ 471 3500 G 461 3575 200 1124 3600 345C 0 0 07-De¢-99 0 1900 1850 1099 3550 0 0 70 8~ 471 3500 G 456 3575 200 IIII 3600 345C 0 0 01 0 0 95~ O8-Dec-99 0 1800 180C 1109 3550 0 0 70 8e 547 3500 G 460 3575 200 1118 3600 345¢ 0 0 0: 0 0 925 09-Dec-99 0 1800 1825 1087 3550 0 0 70 8e 459 3600 G 451 3600 200 1106 3600 3425 0 0 0i 0 0 925 10-Dec-99 0 1800 1825 II01 3550 0 0 70 8~ 557 3600 0 459 3600 200 1118 3600 3425 0 0 0i 0 0 925 II-Dec-99 0 1800 180¢ 1106 3550 0 0 70 81 532 3600 0 456 3600 200 1117 3600 343C 0 0 12-Dec-99 0 1775 1775 il04 3550 0 0 70 8~ 514 3600 0 456 3600 200 1113 3600 345~ 0 0 0 0 9~ 13-Dec-99 0 1775 1775 1108 3550 0 0 70 8¢ 511 3600 G 458 3600 200 1127 3600 343~ 0 0 0 0 ~75 14-Dec-99 0 1775 1775 1087 3550 0 0 70 7~ 487 3600 G 447 3600 200 1104 3600 346¢ 0 0 0 0 15-Dec-99 0 1750 175C 1107 3550 0 0 70 8~ 493 3600 ~ 452 3600 200 1121 3600 343¢ 0 0 0 0 0 102~ 16-Dec-99 0 1750 175C i115 3550 0 0 80 8~ 494 3245 ~ 455 3575 200 1134 3650 345¢ 0 0 0 0 0 1050 17-Dec-99 0 1800 17501 1098 3550 0 0 80 80' 490 3400 ~ 450 3575 200 1114 3650 345C 0 0 0 0 0 1050 18-Dec-99 0 1800 1750 1114 3550 G 0 80 77 495 3400 C 453 3575 150 1130 3650 3450 0 0 0 0 0 1000 19-Dec-99 0 1750 1750 II01 3550 G 0 80 77 480 3400 C 442 3550 150 1108 3650 3450 0 0 0 0 0 975 20-1)ec-99 0 1775 1725 1097 3550 0 0 80 80 484 3450 0 445 3575 200 1120 3650 3450 0 0 0 0 0 975 21-Dec-99 0 1750 1700 1113 3650 G 0 80 80 512 3450 0 463 3600 150 1149 3650 3500 0 0 0 0 0 925 22-Dec-99 0 1750 1700 !113 3550 G 0 80 80 504 3450 0 459 3600 150 1142 3650 3450 0 0 0 0 0 900 23-Dec-99 0 1750 1700 1113 3550 ~ 0 70 79 495 3500 0 461 3600 175 1146 3650 3450 0 0 0 0 0 900 24-Dcc-99 0 1750 1650 1120 3575 0 0 70 79 501 3500 0 467 3600 150 1158 3650 3475 0 0 0 0 0 925 25-Dec-99 0 1750 1650 1127 3575 C 0 70 77 501 3500 0 468 3600 150 1164 3650 3475 0 0 0 0 0 900 26-Dec-99 0 1750 1675 1108 3575 C 0 70 80 479 3500 0 454 3600 150 1136 3650 3475 0 0 0 0 0 900 27-Dec-99 0 1750 1675 1099 3575 C 0 70 79 465 3500 0 446 3625 150 1127 3650 3475 0 0 0 0 0 850 28-Dec-99 0 1700 1650 1104 3575 C 0 70 81 470 3500 0 447 3625 175 1136 3650 3450 0 0 0 0 0 850 29-Dec-99 0 1750 1650 ii22 3575 C 0 70 79 474 3500 0 456 3600 15~ 1169 3650 3450 0 0 0 0 0 850 30-Dec-99 0 1750 1650 1114 3575 O! 0 70 77 467 3500 0 451 3600 150 1157 3650 3450 0 0 0 0 0 850 31-Dec-99 0 1750 1650 Iii0 3600 0 0 74 76 461 3500 0 445 3600 15~ 1151 3650 3450 0 0 0 0 0 800 TOTAL 0 34,343 0 15,125 14,122 34,977 0 0 MAXIMUM 1,925 1,925 3,650 0 80 86 3,600 0 3,625 200 3,650 3,500 0 0 0 1,050 AVERAGE 0 1,796 1,764 1,108 3,560 0 0 72 82 488 3,500 0 456 3,590 181 1,128 3,626 3,452 0 0 0 0 ~mslll~4 i # DAYS 0 31 0 31 31 31 0 0 01/13/00 A33-14 down due to annular commumcatson problem Form I 0d03 submitted to AOC~C on I I/I 9/I 999 ^34-14RDIi down to reduce pressure on A33-14 Form 10-403 submitted to AOGCC on 11/19/1999 ~ WATER INJECTION REPORT PLATFORM A DISPOSAL WELL November-99 A34-14 A41A-I ILN A44-1 [ Al I-I 3R2 Al 1-12 A23-01R AI2-12 A33-14 · DATE &. ~O~E8 l~lJ INJ ANNU ]NJ ]NJ ANNU ]NJ ]NJ ANNU [NJ [NJ ANNU INJ ]NJ ANNU [NJ [NJ ANNU [NJ [NJ AbfNU [NJ [NJ ANNTU , 01-Nov-99 796 3500 3475 1117 3500 0 0 70 93 553 3500 0 479 3525 225 III0 3600 340(3 0 0 0[ 0 1275 127~ 02-Nov-99 gl4 3600 3600 1121 3550 0 0 70 91 672 3500 0 492 3575 175 1133 3650 3450 0 0 o[ 0 1050 1075 03-Nov-99 830 3550 3600 1142 3550 0 0 70 90 618 3500 0 498 3575 175 1155 3650 3450 0 0 C 0 950 1000 04-Nov-99 830 3600 3600 1131 3600 0 0 70 90 589 3600 0 495 3600 150 1151 3600 3500 0 0 C 0 1000 1000 05-Nov-99 829 3600 3600 1131 3600 0 0 70 90 545 3600 0 493 3600 150 1149 3600 3500 0 0 C 0 I000 I000 06-Nov-99 816 3600 3600 Il19 3600 0 0 70 90 603 3600 0 484 3600 150 Il31 3600 3500 0 0 £ 0 1000 100C 07-Nov-99 820 3600 3600 1120 3600 0 0 70 90 576 3600 0 485 3600 175 1135 3600 3450 0 0 ¢ 0 I000 IOOff 08-Nov-99 820 3600 3600 1118 3600 0 0 70 90 582 3600 0 483 3600 175 Il31 3600 3450 0 0 C 0 1000 1000 09-Nov-99 830 3600 3600 1129 3600 0 0 70 90 567 3600 0 490 3600 175 1143 3600 3450 0 0 ~ 0 I000 IO00 lO-Nov-99 833 3600 3600 1125 3550 0 0 70 90 564 3500 0 490 3600 175 1135 3650 3450 0 0 01 0 800 800 II-Nov-99 826 3600 3600 i044 3550 0 0 70 91 572 3600 0 486 3600 160 Il40 3600 345~ 0 0 01 0 850 850 12-Nov-99 855 3600 3600 1113 3550 0 0 70 91 620 3600 0 500 3600 150 1lTl 3600 345~ 0 0 0 0 450,~s~k75 13-Nov-99 825 3600 3600 1091 3550 0 0 70 91 578 3600 0 482 3600 140 1131 3600 346~ 0 0 01 0 200C 14-Nov-99 833 3600 3600 1107 3550 0 0 70 91 582 3600 0 485 3600 150 1140 3600 3440 0 0 O[ 0 20 ~O75 15-No~-99 852 3600 3600 1134 3550 0 0 70 88 656 3600 0 497 3600 140 1167 3600 3450 0 0 ¢ 0 20 1850 16-Nov-99 841 3600 3600 Il19 3550 0 0 70 89 667 3600 0 493 3600 120 1153 3600 3475 0 0 C O 20 115¢ 17-Nov-99 846 3600 3600 1125 3550 0 0 70 89 647 3600 0 492 3600 II0: 1156 3600 3450 0 0 ~ 0 20 105£ 18-Nov-99 853 3600 3600 1132 3550 0 0 75 88 613 3600 0 496 3600 15ff 1166 3600 3450 0 0 ~ 0 0 II0t 19-Nov-99 501 2600 2600 Il02 3550 0 0 75 90 437 3600 0 458 3600 150! 1097 3600 3475 0 0 ~ 0 0 95t 20-Nov-99 0 2300 2300 1089 3550 0 0 75 90 546 3450 0 458 3575 20t IlO0 3575 3450 0 0 ~ 0 0 100C 21-Nov-99 0 2250 2250 Il13 3550 0 0 75 90 531 3450 0 472 3600 200 1125 3550 3450 0 0 ~ 0 0 95£ 22-Nov-99 0 2150 2150 Il14 3550 0 0 75 90 408 3500 0 473 3600 200I:1121 3600 3450 0 0 0 0 0 90f 23-Nov-99 0 2125 2125 1093 3550 0 0 75 90 513 3500 0 463 3600 200 Il07 3600 3450 0 0 C 0 0 900 24-Nov-99 0 2075 2075 iio9 3550 0 0 75 88 509 3500 0 443 3600 200 1105 3600 3450 0 0 C 0 0 850 25-Nov-99 0 2020 2020 1140 3550 0 0 70 $? 1521 3600 0 479 3600 200 1145 3600 3450 0 0 ~ 0 0 850 26-Nov-99 0 2020 2000 1104 3550 0 0 70 86 503 3500 0 465 3575 225 1108 3600 3450 0 0 C 0 0 850 27.No~-9~) 0 2050 2000 IIII 3550 0 0 70 86 493 3500 0 466 3575 225 1114 3600 345~ 0 0 ~ 0 0 925 28-Nov-99 0 2000 1975 1124 3550 0 0 70 86 516 3500 0 470 3575 200 1124 3600 3450 0 0 O 0 0 925 29-Nov-99 0 2000 1950 1097 3550 0 0 70 8~ 489 3500 0 461 3575 200 Il04 3600 3475 0 0 0 0 0 1000 30-Nov-99 0 1950 195~ 1127 3550 0 0 70 86 507 3500 0 472 3575 200 1130 3600 3450 0 0 0 0 0 975 TOTAL 15,450 33,432 0 17,777 14,400 33,983 0 0 MAXIMUM 3,600 3,600 3,600 0 75 93 3,600 0 3,600 225 3,650 3,500 0 0 2,000~5i AVERAGE 515 3,006 3,002 I,114 3,558 0 0 71 89 593 3,550 0 480 3,591 175 1,133 3,603 3,456 0 0 0i 0 449 ~'~Ol # DAYS 19 30 0 30 30 30 0 0 12/I 3/99 A33-14 down due to annular commumcat~on problem Form 10-403 submstted to AOGCC on I 1/19/1999 A34-14 RDll down to reduce pressure on A33-14 Form 10-403 submstted to AOGCC on I I/! 9/I 999 ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25 432 CROSS TIMBERS OPERATING COMPANY Name of Operator MIDDLE GROUND SHOAL Fleld andPool DAILY AVERAGE November-99 Month and Year of InJect.on TOTAL MONTHLY !. 2. 3 4. 5. Well # APl # Type Field & Method 50- Pool Code Al 1-12 7331008300 4 524114 6 TUBING PRESSURE CASING PRESSURE 6. 7. 8. 9. 10. Days in MAX Average MAX Average Operation PSIG PSIG PSIG PSIG INJECTION INJECTION 11. 12. 13. 14 Liquid Gas Laquid Gas (BBL) (MCF) (BBL) (MCF) 30 3.600 3.591 225 175 480 14,400 AII-13R2 7332000701 4 524114 6 AI2-12 7332004400 4 524114 6 A23-01R 7332023801 4 524114 6 A33-14 7332005700 4 52~114 6 A41A-IILN 7332017903 4 524114 6 A34-14 7331008601 4 524114 6 C23-23 7332010200 4 524114 6 C23-26 7332007100 4 524114 8 C24-23 7332014501 4 524114 6 C34-23 7332004100 4 524114 6 C41-23 7332016300 4 524114 6 C41-26 7332040900 4 524114 8 C24A-23 7332040100 4 524114 6 A44-11 7332002700 5 524036 9 C4414RD 7332025201 5 524036 9 30 3,600 3,550 0 0 593 0 0 0 0 0 0 30 3,650 3,603 3,500 3,456 1,133 0 2,000 449 2,075 1,060 0 30 3,600 3,558 0 0 !,114 19 3.600 3.006 3.600 3.002 515 30 3.500 3.440 3.110 3.108 i.374 0 50 50 0 0 0 30 3.500 3.499 3.500 3.500 391 30 3.560 3.549 0 0 1.965 0 750 715 650 650 0 0 645 637 450 450 0 30 3.500 3.498 140 115 125 0 75 71 93 89 0 0 0 129 550 550 0 Total 17,777 0 33,983 0 33,432 15,450 41,207 0 11,729 58,942 0 0 3,741 0 0 230,661 I heseby cetlffy that the foregoing is tn~e and/~ect to the best of my knowledge TItle Office Manager Date I 0-Dec-99 Form 10-406 Iorm 10-406 Rev 07/27/99 ~.,bm,t m D,phcate June 15, 1994 Shell Western E&P Inc, 601 West F~fth Avenue * Suite 800 Anchorage, Alaska 99501 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' SUBMITTAL OF REPORT OF SUNDRY WELL OPERATIONS (FORM 10-404) for MIDDLE GROUND SHOAL A44-11 REFERENCE' SUNDRY APPROVAL NUMBER 94-140 Enclosed are duplicate copies of the Report of Sundry Well Operations (Form 10-404) for Middle Ground Shoal A44-11 Operations were completed 5/24/94. If you have any questions or wish to discuss, please call Paul Huckabee at (907) 263-9646. Sincerely, Paul Huckabee Staff Production Engineer ) STATE OF ALASKA ., ALA~ . OILAND GAS CONSERVATION COMMI~' )N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed. O~3eram3n P~I ~. N~e ot O~r~or ~ ~ Ty~ ~ Wai. SHELL WESTERN E&P INC ' ~o~ __ 3 ~ress 601 W. 5th Ave, Ste. 920 S~a~,c~ ~D~horaqe, AK 99501 Se~ce~ 4 ~a0n0f~latsudacePlatform "A",Leg 2,Conductor 16 ~1690' N & 385' W from SE Corner of Sec. 11, T8N, R13W, S.M. Att°D°f~ro~uc~nte~Top Disposal Perf ~4938' :1719'N & 538' W from SE Corner of Sec. 11 At effe~ aeptn At total clel)th 11 , TBN , 12. Present well conctmon summary Total depth: measured true vertical 234'N & 866'W from S.E. corner of Sec R13W. S.M. Effective deoth measured true verac~l 9260'f~t 8931'f~t 6. Datum elevatmn (DF or KB) 116 ' KB feet 7. Umt or Property name Middle Ground Shoal 8 Well number A44-11 9 Perm,t num~er/aDprova numOer 163 APl numOer 50-- 733-20027-00 11. Field/Pool MGS-No Pool Designatio Cas, ng Length Structural Conductor Surface 1912 ' Intermediate Proclucaon 9211 ' LJner Perforal~on deDth: Plugs (measured) C e me n t 5500 ' - 5350 ' & 7302-7818' 5350'f~t Junk(measured) 3½" tubing 5338'f~t Packers set 8579'. Fish Size Cemented Measureddepm from 7818-8615. @8369' .8506' , @9062' True~mcadepm 10 3/4", 2200SX 1912' 1911' 40.5~ J-55 7" 26-29~N-80 2350SX 9211' 8883' measured 4938'-4992' & t~e ver~c~ 4933 ' - 4986 ' & 5226'-5300' 5216'-5287' RECEIVED JUN 2 0 1994 Tub,ng (size.. grade, and measured depth) 3 ½ ~ , 9.3 #, N- 8 0, D u o 1 i n e Packers and SSSV (type and measured del)th) B a k e r S A B - 3 P a c k e r @ 3037 ' Alaska 0il & Gas Cons. Commismoi Anchorage (IPC) 92962' 13. Stimulation or cement squeeze summary Interv~streated (measured) 4938 ' - 4992 ' & 5226 ' - 5300 ' Treatmentdescnpl~on~ncludlngvolumesusedandflnaipressurel00 bbls 2.5% HC1 @4-BPM @1400 psi 14. Representative Da~t¥ Average Produc~on or I njecaon Data OiI-Bbl Gas-Md Water-Bbl Camng Pressure Tubing Pressure Pnor to well operation N / A Subseauent to ooerat~on N / A 15. Attachments 116. Status of w~l ctasmflca~on as: Cop~es of Logs and Surveys run __ I Dady Re~3rt of Well Operations __x Oil __ Gas __ Suspended __ Sennce ;. I hereDy certify that the foregoing is true and correct to the best of my knowledge. Slgned~'~--Q ~ ~fle Staff Production Engineer Form 10-404 Rev 06/15/88 Disposal Date SUBMIT IN DUPLICATE 05-25-1994 O$:0GAM FROM Shell Plat'Form A TO ANC OFFICE * FLATFO-N~: A WELL: A44-11 24-May-94 FOI~tAN: T. R~E , A~: ~I~: P. T. ~~EE * A~: D ~. O0 ~TI~: * ~: NO A~I~ ~ DAYS & DAYS E~I~D: OF 7. , * SPI~: NO SPI~ RE~D F~ID ~: FIW ~ ~W. ~ ~ TI~ ~ S~ OF *19:~-22:~ ~ 100 ~ OF 2 1/~ H~ ~ INJE~ION W~ AT A ~TE OF .4 ~ P~. l~. ~ES. ~ l~. ~ 215 BB~ OF FIW AT A ~ OF 4 ~LS P~. *INJ. ~S. ~S 1~. ~]NG INJ. PRES. ~ 14~. SF~ iN ~SS W~ 10~. *~ MIN. A~ S~ IN ~S 65~. , , , , , , RECEIVED JUN 20 1994 At~$ka Oil & Gas Cons. Commismon Anchorage ( P.01 FAX TRANSMTTTAL PLEASE DELIVER OR CALL IHHEDZATELY I!! JUNE !3, !994 TO: BLAIR #ONDZELL - AOGCC ph# (907) 279-1433 FAX # (907) 276-7,542 FRO#: P. T. HUCKABEE, Anchorage, AK ph# (907) 263-9646 FAX # (907) 263-9618 SUBJECT: MGS A44-11 CEMENT DETAILS Blair ... Further to your request to provide information regarding cementing details on A44-11, following is the calculation of top of cement (TOC) above the 10-3/4" casing shoe in the 7" x 10-3/4" annulus, Note that the TOC is calculated to be 735' above the casing shoe. This complies with AOGCC Regulation 20 AAC 25.030 {d) (3) (C) which requires a minimum of 500' above the casing shoe. Please call ~ 263-9646 if you wish to discuss further. THANKS! Paul Huckabee (907) 263-9646 cc: A. J. Cline 3. M. Winder May 25, 1994 Shell Western E&P Inc. 601 West F~fth Avenue · Suite 800 Anchorage, Alaska 99501 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT SUBMITTAL OF APPLICATION FOR SUNDRY APPROVALS (FORM 10-403) for MIDDLE GROUND SHOAL A44-11 Enclosed in triplicate is the Application for Sundry Approval to acid treat our A44-11 disposal well Operations were performed May 24, 1994 aiter obtaining verbal approval from Blair Wondzell If you have any questions or wish to discuss, please call Paul Huckabee at (907) 263 -9646 Sincerely, Paul Huckabee Staff.Production Engineer RECEIVED Oil & Gas Cons. Commission AnChorage STATE OF ALASKA ALA~~ OILAND GAS CONSERVATION COMMIS~' N APPUCArlON FOR SUNDRY APPHOVALS 1. Type of Re¢luest: Abam3on __ Susoen~ __ O~aaon sttutc~wn __ Re-enter susoer~e(t w~l Nter _-=,__~ng __ Reoar we~l __ Plugging __ T, me extens, on __ St,mum'"~'_~..X Change approvecl program __ Pull tul3ng __ Variance __ '~. Name of Operator 5, Type of Welk SHELL WESTERN E&P INC. De~opment__ Ex,oratory __ 3.Aciciress 601 W 5th Ave. Ste. 920 StmagraDn,c..~ · Serwce __ Ancho AK 99501 4. Locatlonofweil~sudace Platform "A",Leg 2,Conductor 16@ 1680'N & 385'W from SE corner of Sec. 11, T8N, R13W, S.M. ~tOpofpr~u~'nterV~To Disposal Pert @4938' :1719'N & 53~'W from SE Corner of Sec. 11 At effective depth ~to~depth 234'N & 866'W from S.E. corner of Sec 11, T8N, R13W, S.M. 12. Present w~l condmon summary Total depth: measured true vemcal Perforate __ Omer __ 6. Datum eleval~on (DF or KB) 116 ' KB 7. Umt or Property name Middle Ground Shoal 8. Well numl3er A44-11 9. Pe~ltnumDer 67-35/93-163 10. APInum~r 50-- 733-20027-00 11F~el~Poot I~GS-No Pool Des gna 9260' fe~ Plugs(measure) cement 5500'- 8931' f~t 7302'- 7818' 5350' & Effecave depth, measured true vemcal Caang Lengm Structur~ Conductor Surface 1912 ' Intermediate Produc~on 9211 ' bner Pedoral~on depth' 5350' fe~ Junk(measure) 3½" tubing 5338' f~t Packers set 8579'· Fish S~ze Cemented Measureddepth 10-~4",40.5# J 7" 26-29#N-80 , from 7,818'-8,615 @8369',8506', @9062' ~ueveR~c~depth 2200sx 1912' 1911' 2350SX 9211 ' 8883 ' measur~ 4938'-4992' & 5226'-5300' ~ueve~c~ 4933 ' -4986 ' & 5216 ' -5287 ' Tubing (s~ze, grade and measured (Jepth) 3 ½", 9. 3 #, N - 80, D u o 1 i n e @3037' Packers and SSSV (type and measured depth) B a k e r S A B - 3 P a c k e r ( ,TP C ) @ 2 9 6 2 ' taste 13. Attachments Descnpt]on summary of proposal ~ Detaled operat]ons program __ BOP sketch __ 14. Est]mated date for commencing operat]on 115. Status of well class~f,cat, on as. May 24, 1994 16. If proposaJ was verbaJly approved Oil __ Gas __ Nameof approverB 1 a i r Wondzell~ 5/24/94 Oa~ approved! Se~ce D i s o o s a 1 17. I here~ cert]h/that the foregoing ,s true and correct to me 0est of my ~,nowteage. S,gned~..-¢. ~ ~eStaff Production FOR COMMISSION USE ONLY Cond,t]ons of aDDrov~: Not~fy Comm~s~on so representative may w~tness Plug ~ntegnty ..._ BOP Test __ Locat]on clearance __ Mecnamca] integnty Test __ Subsequent form required 10- L~ 0 L~ Suspended __ Engineer Date I Approved by order of the Comm,saoner Form 10-403 Rev 06/15/88 Original Signed By D~lvid w .Inh_n?t_n.n. Commissioner Approved Copy Returned Date ~'//"/~ V SUBMIT Ih TRIPLICATE APPLICATION FOR SUNDRY APPROVAL ATTACHMENT DESCRIPTION SUMMARY OF PROPOSAL 1. Rig Up Halliburton to A44-11 disposal well. 2. Establish injection rate of 4 BPM with Filtered Inlet Water (FIW). 3. Pump 100 bbls 2.5% HCL acid at 4 BPM. 4. Follow acid with 215 bbls FIW to overflush perfs. 5. Record ISIP. 6. Rig down Halliburton. RECEIVED ~,[aska Oil & Gas Cons. Commission Anchorage Shell Western E&P Inc. 601 West F~fth Avenue Suwte 800 Anchorage AK 99501 SEPTEMBER 22, 1993 State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 Gentlemen' SUBJECT' SUBSEQUENT REPORT (FORM 10-404) FOR MIDDLE GROUND SHOAL WELL A44-11 (10-403 APPROVAL #93-163) Enclosed are duplicates of the Subsequent Report for the recently completed workover operations on Middle Ground Shoal Well A44-11. The work was completed on August 28, 1993. If you need additional reports or information, please contact me at {907} 263- 9646. Yours truly, P. 1. Ituckabee Staff Production Engineer Alaska Producing Operations PTH/maj Enclosures MAJO4\091093.WP5 . o, nRiGiN4L REPORTSUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Pull tubing __ __ Slimulate Plugglng__ Perforate X Convert Alter casing__ Repairwell __ Other X disposal 5. lype o! Well: 2. Name of Operator Shell Western E&P Inc. Development Exploratory 3. Address 601 W. 5th Avenue, Suite 800, Anchorage, AK 99501 Sl~atigraphic Sewk~e X 4. Location of well at surface Platform "A", Leg 2, Conductor 16 @ 1680' N & 385' W from SE corner of Sec. 11, T8N, R13W, S.M. At top of productive interval Top Disposal Peri @ 4938': 1719' N & 538' W from SE Corner of Sec. 11 At effective depth 234' N & 866' W from S.E. corner of Sec. 11, TSN, R13W, At total depth S.M. 12. Present well condition summary 6. Datum elevation (DF or KB) 116'KB feet 7. Unit or Property name Middle Ground Shoal '8. Well Number A44-11 9. Permit number/approval number 67-35/93-163 10. APl number 50-733-20027-00 111. Field/Pool MGS- No Pool Designation Total depth: Effective depth: Casing Structural Conductor Surface Intermediate Production Liner measured 9260' feet true vertical 8931' feet measured 5350' feet true vertical 5338' feet Length Size 1912' 10-3/4", 40.5~ J-55 9211' 7", 26-29~ N-80 Plugs (measured) Cement ~5500'-5350' & ~7302'-7818' Junk (measured) 3-1/2" tubing from 7,818'-8,615. Packers set @ 8369', 8506', 8579'. Fish @ 9062' Cemented Measured depth True vertical depth 2200sx 1912' 1911' 2350sx 9211' 8883' Perforation depth: measured 4938' - 4992' & 5226' - 5300' true vertical 4933' - 4986' & 5216' - 5287' Tubing (size, grade, and measured depth) 3-1/2", 9.3#, N-80, Duoline @ 3037' Packers and SSSV (type and measured depth) Baker SAB-3 Packer (IPC) @ 2962' RECEIVED S E P 2 4 1993 Alaska 0~1 & Gas Cons. 6ommissio~ 13. Stimulation or cement squeeze summary Intervals treated (measured) 1920' to 1250' in 7" x 10-3/4" annulus Treatment description including volumes used and final pressure Circulation squeeze 205 sx Class G Anchorage 14. Prior to well operation Subsequent to operation Representative Daily Averaoe Production or In!ection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure 0 0 0 0 0 0 0 5 BPM 0 1250 psi 15. Attachments: MIT test form Copies of Logs and Surveys run Daily Report of Well Operations X . 17. I hereby certify that the foregoing ~s true an. 6. Status of well classification as: Oil Gas Suspended correct to the best of my Knowledge Title Staff Production Engineer Service Disposal Injector Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE DAILY REPORT * ¢. - PLATFORN: A NELL: A~-11 Aug-93 FORENAN: R. V. 'dELLS * AFE: 263007 ENGINEER: P. T. HUCKABEE * ************----******--**************************************************** AUTH: $245,000 DALLY: $8,361.00 CUNULATIVE: $8,361.00 * DAf YTD: .... 0 TR! YTD: .... 0 DAYS & DAYS ESTINATED: .75 OF * . COHNENTS: NO ACCIDENTS REPORTED FLUID TYPE: 'dEIGHT: * * SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: TOF: * TINE AND ~RY OF OPERATIONS: * * RIG ACCEPTED FROH A3&-11 AT 1200 HOURS 08/17/93 18.0 HRS TEARING OUT RIG FOR TURNING 180 DEGREES AND HOVING FRON LEG 1 TO LEG 2 18.0 NR$ TOTAL THIS REPORT ************************************************************************************* DAILY REPORT * !~ * PLATFORN: A 'dELL: A/,/,-11 ;,g-Aug-93 FORENAN: R. V. 'dELLS * AFE: 263007 ENGINEER: P. T. HUCICABEE * AUTH: $2/*5,000 DALLY: $11,147.00 CUHULATIVE: $19,508.00 * DA! YTD: .... 0 TR! YTD: .... 0 DAYS & DAYS ESTiHATED: 1.75 OF 6.6* . COHHENTS: NO ACCIDENTS REPORTED FLUID TYPE: i/EIGHT: * . SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: TOF: * TINE AND SUNHARY OF OPERATIONS: * . 2/, HRS. - PREPARE RIG FOR HOVE FRON LEG '1 TO LEG 2 Gas Anchorage DAILY REPORT * ~0 * PLATFORM: A gELL: A/~-11 ~l~-Aug-93 FOREMAN: R. H. SELTLZ * AFE: 263007 ENGINEER: P. T. HUCICABEE * AUTH: $245,000 OAILY: $12,506.00 CUMULATIVE: $32,014.00 W *************************************************************************************** DAI YTD: .... 0 TRI YTD: .... 0 DAYS & DAYS ESTIMATED: 2.75 OF 6.6* , COMMENTS: NO ACCIOENTS REPORTEO FLUIO TYPE: WEIGHT: * , SPILLS: NO SPILLS REPORTEO RT TO TBG HANGER: TOF: * TIME AND SlJle4ARY OF OPERATIONS: HRS. - PREPARE RIG FOR HOVE FROH LEG 1 TO LEG 2 SET OUT PUHP HOUSE, WELDING SHOP, & LIGHT WATER TANK gELD SKID BEANS TO DECK - ROTATE RIG 180 DEGREES BEGIN TO SKID RIG FROM LEG 1 TO LEG 2 DAILY REPORT * 2.1 * PLATFORM: A gELL: A44-11 ~-Aug-93 FOREMAN: R. H. SELTLZ * AFE: 26300? ENGINEER: P. T. HUCKABEE * AUTH: $245,000 DALLY: S12,223.00 CUMULAT%VE: S44,237.00 * DA! YTD: .... 0 TRI YTD: .... 0 DAYS & DAYS ESTIMATED: 3.75 OF 6.6* * COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: ~/EIGHT: * * SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: TOF: * TIME ANO SUNMARY OF OPERATIONS: HRS. - SKID RIG FROM LEG 1 TO LEG 2 - RIG UP UNLOAD BOAT (TUBULARS AND MISC. EQUIPMENT) REHOVE SKIO BEANS FROM OECK REPLACING HANORAILS ~HERE NECESSARY OUE TO RIG MOVE 7_ P 4 199: &taska Od & Gas Cons. Anchorage AODITIONAL COMMENTS; DRILLS, VISITORS, INSPECTORS ETC... HOTEl NOTIFIEO AOGCC ON FRI. 8-20-93 OF UPCOMING BOP TEST. DAILY REPORT PLATFORN: A WELL: A&&-ll 34'-Aug-93 FOREMAN: R. H. SELTLZ AFE: 26~007 ENGINEER: P. T. HUCEABEE AUTH: S2~S,000 DALLY: $12,112.00 CUNULATIVE: $56,369.00 DAI YTD: .... 0 TRI YTD: .... 0 DAYS & DAYS ESTIMATED: 3.75 OF 6.6' COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: WEIGHT: SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: 38.55~ TOF: TIME AND SUNMARY OF OPERATIONS: 15.5 HRS. - RIGGING UP ' MAKE UP WATER LINES ' RIG UP SERVICE AIR ' STRING ELEC' TRI~&L LINES & PLUG IN ' RUN KO~EY REMOTE ' SET CATWALK, BEAVER SLIOE & DRLG LINE HOLDER ' WORK ON HANDRAILS - TRANSFER LIGHT WATER FROM PITS LIGHT UATER TANK - SET HO~CO EQUIP. & TAKE ON 250 SXS CLASS G CEMENT LEVEL DERRICK ' HANG RETURN WATER & ~" & 6" CHOKE LINES. 8.5 HRS - HELD PRE-JOB SAFETY MEETING PRIOR TO PULLING TREE AND INSTALLING BOPS MAKE UP LANDING JT. - CHECK t~ELL FOR PRESSURE - PULL TREE & SET TEST PLUG - SET RISER AND NIPPLE UP BOPS. DALLY REPORT * PLAIFORM: A WELL: A66-11 ~-'~.-Aug-93 FOREMAN: R. H. SELTLZ * AFE: 263007 EHGINEER: P. T. HUCICRBEE *************************************************************************************** AUTH: $245,000 DALLY: $12,112.00 CUMULATIVE: $68,661.00 DAI YTD: .... 0 TRI YTD: .... 0 DAYS & DAYS ESTIMATED: 5.75 OF 6.6* COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: WEIGHT: * , SPILLS: NO SPILLS REPORTED RI TO TBG HANGER: 38.55~ TOFf * TIME AND SUMMARY OF OPERATIONS: 10.50 HRS - NIPPLE UP BOPS, FLC~ LINE, 4' & 6" CHOKE LINES, & RETURN WATER RE-FAB PITCHER NIPPLE ANO INSTALL 7.50 HRS - TEST BOPS AND RELATED EQUIPMENT. - TEST HYDRIL TO 250/3500 PSI TEST RAMS ANO ALL OTHER EQUIPMENT TO 250/5000 PSI REPAIR THREAOEO UNION ON MUO LINE. 1.50 HRS - CHANGE SAVER SUB ON TOP DRIVE - CHANGE DIES 4.50 HRS - STRAP AND CALIPER BHA - PICK UP SAME - PICK UP ~ 1/2" DP. * PLATFORM: A WELL: A6&-ll 24-Aug-9] FOREMAN: R. H. SELTZ AFE: 26]007 ENGINEER= P. T. HUCKABEE * AUTH: $2~5,000 DAILY= $17,862.00 CUMULATIVE: $86,]2~.00 * DAf YTD: .... 0 TRI YTD: .... 0 DAYS & DAYS ESTIMATED: 6.75 OF 6.6* * COMMENTS: NO ACCIDENTS REPORTEO FLUID TYPE: WEIGHT: * * SPILLS: NO SPILLS REPORTEO RT TO TBG HANGER: ~8.55' TOF: * TIME AND SLJW4ARY OF OPERATIONS: * * ~.00 HRS' TIH W/ HILL & SCAPER TO 2108' * 1.00 HR. - CIRC. * 2.00 HRS. - TOOH * 2.00 HRS. ' REMOVE PITCHER NIPPLE & INSTALL SHOOTING FLANGE ' R/U SCHLUMBERGER * 7.00 HRS. ' WELD OUT 4" & 6" CHOKE RETURN L]NES, TRIP TANK LINE, & HANG * DERRICKMAN'S ESCAPE LADDER. ' RIG UP 2'" RETURN LINE OFF 7" X * 10 3/~" ANNULUS ' HANG PIPE SPINNERS ' TIGHTEN STDPIPE BRKTS. * 4.50 HRS. - HELD PRE'JOB SAFETY MEETING CONCERNING PERFORATING & WlRELINE * OPERATIONS - RIG UP LUBRICATOR & TEST TO 500 PSl - RIH WITH * GUNS. NOTE: LOST 1 1/2 HR. OUE TO SCHLUMBERGER COMPUTOR. * PERF. 7" CSG. ~ 1920' W/ 2' 3 3/8" HSD 34B HJ II RDX CASING GUN * 3 SPF ~ 120 DEGREE PHASING. * · 50 HR. ' PUMP 53 BBLS. DOtal 7" ~ 4BBL/MIN a 500 PSI ' NO RETURNS * ~.00 HRS. ' R/D LUBICATOR/SCHLUMBERGER - REMOVE SHOOTING FLANGE ' R/U * PITCHER NXPPLE. * 1.00 HR. ' PUMP DOt~ ANNULUS & BREAK CIRC. - PUMP OOl~ 7" & CIRC. * DAILY REPORT PLATFORM: A WELL: A4~-11 ~25-Aug~,] FOREMAN: R. H. SELTZ * AFE: 263007 ENGINEER: P. T. HUCKABEE * AUTH: $245,000 DAILY: $27,858.00 CUMULATIVE: $11~,181.00' DAI YTD: .... 0 TRI YTD: .... 0 DAYS & DAYS ESTIMATED: 7.75 OF 6.6' * COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: FIW WEIGHT: 8.5* SPILLS: NO SPILLS REPORTEO RT TO TBG HANGER: ]8.55' TOF: * TIME AND SUMMARY OF OPERATIONS: 1.50 HRS- CIRC. DOWN 7" AND UP 7" X 10 3/M' ANNULUS AT 4 BBL/MIN. 1.50 HR. - MAKE UP 7" CHAMP III PACKER & TAIL PIPE - TIH 1.50 HRS. - RIG UP CEMENT LINES 1.50 HRS. - SET PACKER ~ 1626' - TAIL PIPE a 1662' -HOLO PRE-JOB SAFETY MEETING - CLOSE PIPE RAMS & APPLY 500 PSI IN ~.5" X 7" ANNULUS CIRC. 5 BBL/MIN a 500 PSI ' MIX 4,2 BBL. CLASS G CMT. W/ '1.5~. LAC CC2 - DISPLACE W/ 19 BBC FIW - CMT IN PLACE @ 11:30 ~'_) ~ ~.00 HRS. - W.O. CMT. 1.00 HR. - BLEED ANNULUS - UNSEAT PACKER - R/D LINES 1.50 HR. - TOOH W/CHAMP PKR. & STINGER - LAY DOWN SAME '- 4.00 HRS. - MAKE UP MILL & dARS - TIH PICKING UP ].5" DP - TAG CMT @ 180] 2.50 HRS. - BREAK CIRC. - DRLG. CMT FROM 1803' TO 1920' - CIRC. ~J~S~ OiJ .50 HRS. - CLOSE RAMS & TEST CASING TO 1500 PSI FOR 30 MIN. ~.00 HRS. ' PICK UP ~.5" OP 2.50 HRS. - TIH - TAG CMT ~ 507~' ' DRLG. CMT * *************************************************************************************** ADDITIONAL COMMENTS; ORILLS, VISITORS, INSPECTORS ETC... * * 8HA = 6 1/8" MILL, BIT SUB, /* ]//*q DRLG dARS, (12) 4 ~/4" DC * * DAILY REPORT ( * PLATFOR#: A WELL: A~'11 ~5'-Aug-93 FOREMAN: R. H. SELTZ AFE: 263007 ENGINEER: P. T. HUCKABEE * ************************************************************************************** DA! YTD: .... 0 TR! YTD: .... 0 DAYS & DAYS ESTIMATED: 7.75 OF 6.6* COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: Fig WEIGHT: 8.5* * SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: 38.55' TOF: * *************************************************************************************** TIME AND SUHI4ARY OF OPERATIONS: 1.50 HRS ' CIRC. DOUN 7" AND UP ?" X 10 3/4" ANNULUS AT 4 BBL/MIN. 1.50 HR. - MAKE UP 7' CHAMP III PACKER & TAIL PIPE ' TIH 1.50 HRS. ' RIG UP CEMENT LINES 1.50 HRS. ' SET PACKER g 1626' ' TAIL PIPE g 1662' 'HOLO PRE'JOB SAFETY MEETING - CLOSE PlPE RAMS & APPLY 500 PSI IN 3.5" X 7" ANNULUS CIRC. 5 BBL/NIN g 500 PSI ' MIX 42 BBL CLASS G CMT. M/ 1.5X CAL CL2 -OISPLACE ~/ 19 BBL FI~ - CMT IN PLACE g 11:30 3.00 HRS. - W.O. CMT. 1.00 HR. 'BLEEO ANNULUS ' UNSEAT PACKER ' R/O LINES 1.50 HR. ' TOOH W/CHAMP PKR. & STINGER ' LAY DC)UN SAME G.O0 HRS. ' HAKE UP MILL & dARS ' TIH PICKING UP 3.5" OP - TAG CMT g 1803 2.50 HRS. - BREAK CIRC. ' DRLG. CMT FROM 1803' TO 1920' - CIRC. * .50 HRS. - CLOSE RAMS & TEST CASING TO 1500 PSI FOR 30 MIN. * 3.00 HRS. ' PICK UP ~.5' DP * 2.50 HRS. - TIH ' TAG CMT g 5075' ' DRLG. CMT * ************************************************************************************** AODITIONAL COMMENTS; DRILLS, VISITORS, INSPECTORS ETC... * BHA = 6 1/8" MILL, BIT SUB, 4 3/4" DRLG JARS, (12) 4 3/4" DC * DAILY REPORT * * PLATFORM: A ~ELL: A44-11 2?-Aug-9~ FOREMAN: R. H. SELTZ AFE: 26~007 ENGINEER: P. T. HUCKABEE * AUTH: S2~5,000 DALLY: $31,466.00 CU~LATIVE: *************************************************************************************** DAI YTD: .... 0 TRI YTD: .... 0 DAYS & DAYS ESTIMATED: 8.75 OF 6.6* COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: BRINE ~EIGHT: 9.6* SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: 38.55' TOF: * TIME AND SUMMARY OF OPERATIONS: ~.00 HRS - DRLG. CMT. TO 5350' 2.50 HRS. - CIRC. & RAISE UT. TO 9.6 .50 HRS. - PRESSLIRE TEST CASING TO 1500 PSI 3.00 HRS. - STRAP OUT OF HOLE - NO CORRECTION 1.00 2.00 1.00 2.00 8.00 HRS. - SERVICE RIG & TOP DRIVE HRS. - P/U 7" SCRAPER - TIH TO 3200' HR. - CIRC. HRS. - TOOH HRS. - R/U SCHLUMBERGER & TEST LUBRICATOR TO 500 PSI - HOLD SAFETY MEETING PRIOR TO PERFORATING - PERF. FROM ~938 TO ~992~ & 5226' TO 5~00' ( DAILY REPORT PLATFORM: A WELL: A~,Z~-11 2*7'-Aug-93 FOREMAN: R. H. SELTZ AFE: 263007 ENGINEER: P. T. HUCKABEE AUTH: $245,000 DALLY: $11,550.00 CUNULATIVE: $158,459.00 DAI YTD: .... 0 TRI YTD: .... 0 DAYS & DAYS ESTIMATED: 9.75 OF 6.6* COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: BRINE WEIGHT: 9.6 SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: ~8.~~ TOF: TIME AND SUMMARY OF OPERATIONS: ~.SO HRS. - PERF. FROM &938~ TO ~992~ & 5226~ TO 5300~ ' (6) RUNS TOTAL * NOTE: HAD ONE (1) MIS'FIRE ' RUN #4 &982r TO &992~ * 1.50 HRS. - R/D SCHLUMBERGER - SHUT IN & ESTABLISH INJECTION RATE * WHILE MONITORING BACKSIDE - PUMP 5 BBL g 1075 PSI * 9.50 HRS. ' R/U & RUN TBG. ' RAN 96 JTS. 3.5" 9.3# 8RD DUOLINE TBG & * 1JT 3.S" 9.3# 8RD (TAIL PIPE) TOTAL TBG = 2979.76~ * TBG TAIL g 3037~ - PACKER g 2962~ ' xg NIPPLE g 3003~ ' X NIPPLE * g 2930~ & 281' - NOTE: HAD PROBLEMS W/ RIG HYDRAULIC UNIT * .50 HRS. - TEST TBG. TO 1500 PSl * .50 HRS. - TEST 3.5" X 7" ANNULUS TO 1500 PSI ' STATE WITNESSED * .50 HRS. ' PRESSURE UP TO 3700 PSI & SHEAR OUT PLUG FROM RE-ENTRY GUIDE * 1.00 HRS. - R/O HOSES - L/O LANOING dT - SET BPV * 2.00 HRS. - CLEAN UP RIG FLOOR - BLOU OOWN LINES * ~.00 HRS. - N/O BOPS * ~1l ' ,___.__ £0'd qWlOl i;ImV[IT TO DISq)SAL 5.0 BPR lllll ,. t,t00 ,,i I i Ii ii i ,,/Yyo ~presV~441~c~. Pzu 8/18/o2 £0'd 3JIJJ8 3NU 0£ ~ mJ°}~eId [[aqS NO~d N~:90 £66T-Bg-80 ( 14 !DDLE GROUND SHOAL A44- I ! COI~/'ERT TO DISPOSAL A44-11 D)_S_ _POSAL RECORD FORM Send a copy of +.he completed form, to Production Engineerln§ In Anchorage. Retain a copy of the form for the Pl atfo~ files. FLUID DATE TIME D[SCRIPTION .- . _ PRIOR BEGIN SI INJ. INO. INJ. PRESS PATE PRESS VOLUME (psi) (I~PM)(psi)(bbls) i m l~ 5".0 ~z~o ~95 30 END AFTER INO. SI PRESS IS {psi) (psi) [psi) \orogSA44 ! 1 CTD. PRG page 6 Alaska Od & Gas Cc,,,s. Commissto~', anchora~s gO'd 33IJJO 3NW 0£ U muo~eIJ ~raqs NO~J NU0~:90 £66I-8~-B0 June 14, 1993 Shell Western E&P Inc.~ 601 West F~fth Avenue · Suite 800 Anchorage, Alaska 99501 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Gentlemen: SUBJECT: SUBMISSION OF APPLICATION FOR SUNDRY APPROVAL FOR MIDDLE GROUND SHOAL WELL NO. A44-11, MIDDLE GROUND SHOAL FIELD, COOK INLET Enclosed in triplicate is the Application For Sundry Approval to convert MGS A44-11 to a disposal well for Platform "A" as authorized by Area Injection Order No. 9, Rule No. 2. Approval of the plan was granted in July 1991 (Approval No. 91-216) but operations were not performed because the Platform "A" drilling program was deferred. Workover operations are expected to begin approximately July 15, 1993. If you have any questions or wish to discuss, please call me at (907) 263-9646. Sincerely, Paul Huckabee Staff Production Engineer Alaska Producing Operations Enclosures RECEIVED J UN 1 6 199~ Alaska 0ii & Gas Cons. Comm'tss[o~ Anchorage AI_~oKA OIL AND GAS CONSERVATION COMMIS~,ON ~' I//~ APPLICATION FOR SUNDRY APPROVALS ~ don Suspend__ Operalmn shutdown __ Re-enter suspended well Alter casin~ Repair Well Plugging__ Time extension SlJmulate 1. Type of Request: Abandon Change approved program __ 2. Name of Operator Shell Weatem E&P Inc. 3. Address 601 West 5th Avenue, Suite 800 Anchorage, AK 99501 4. Location of well at surface At top of productive interval Plat. "A", Leg 2, Con. 16. 11, T8N, R13W, S.M. Pull tubing Vanence 5. I ype Of Well: Development Exploratoq/ Stratigraphic Service X 1680'N & 385'W from S.E. corner of Sec. Production Interval P&A'd At effective depth At total depth 234'N & 866'W from S.E. corner of Sec. 11, T8N, R13W, S.M. 12. Present wcll condition sumn-~ary P~:~rate X o~X ~:~o.~,1 6. Datum elevation (DF or K~I --~-- 116' DF feet 7. un~ or Property name Middle Ground Shoal 8. Well number A44-11 9. Permit number 67-35 10. APl number 50-733-20027-00 11. Field/Pool MGS- No Pool Dccignation Total depth: Effective depth: Casing Structural Conductor Surface Intermediate Production Liner measured 9260' feet true vertical 8931' feet measured 5100' feet true vertical 4992' feet Length Size Plugs (measured) Junk (measured) Cemented 1912' 10-3/4", 40.5~ J-55 2200sx 9211' 7",26-29~ N-80 2350sx Cement ~5500'-5100' & ~7302'-7818' 3-1/2" tubing from 7,818'-8,615'. Packers set @ 8369', 8506', 8579'. Fish @ 9062' Measured depth True vertical depth 1912' 1911' 9211' 8883' Perforation depth: measured 7666'-9137' 10 Intervals - Abandoned true vertical 7423'-8811' - Abandoned R E C ~ IV ~ D Tubing (size, grade, and measured depth) 3-1/2" from 7,816'-8,615'- Abandoned JUN 1 6 1995 Packers and SSSV (type and measured depth) Packers set @ 7598', 8369', 8506', 8579' - Abando~,~Ska 0i| & Gas ConS. Anchorage 13. Attachments Description summary of proposal X Detailed operations program __ BOP sketch 14. Estimated date for commencing operation 07/15/93 15. Status of well classification as: 16. If proposal was verbally approved Oil__ Gas __ Suspended N/A Service Disposal Injector Name of approver Date approved 7. I hereby~ify tha~th, e foregoing is true and correct to the best of my knowledge Signed (,. y,_.~ ~ Title Staff ProductionEngineer Date FOR COMMISSION USE ONLY )onditions of approval: Notify Commission so representative may witness IApproval No. Plug integrity BOP Test Location clearance Mechanical in~grity Test / ---Subsequent form requi'~d 10- · ~,pproved by order of the Commission O(lg. in~l_ S!gned By -D~v;;d ¥¢. Je, hn$;ton Returned Commissioner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE MIDDLE GROUND SHOAL WELL NO. A44-11 CONVERT TO DISPOSAL WELL CURRENT STATUS Middle Ground Shoal {MGS) A44-11 is currently suspended with a cement plugback to 5100' {Sundry Approval # 90-143). The E, F, and G pools were abandoned in March 1990 and have no further productivity or injectivity potential. A workover is recommended to convert A44-11 to a disposal well prior to the proposed drilling program on Platform "A". The disposal well will be used to dispose of approved drilling and workover fluids and other oil field waste fluids. PROPOSED OPERATIONS PROCEDURE 1. Skid rig to Leg 2, Conductor 16. 2. RU rig for well servicing operations. ND tree. NU BOPE and test per Shell Oil Company "Safe Practices For Drilling and Well Servicing Operations, Volume 1, Section 4" and AOGCC Regulation 20 AAC 25.285. 3. RIH with 6-1/8" bit and casing scraper to 2100' to ensure wellbore is clear for perforating and cementing operations. POOH. 4. RU EWLU and perf 7" casing w/ 4 JSPF at - 2000' {NOTE: 10-3/4" surface casing shoe is at 1912'). POOH. RD EWLU. 5. Cement 7" x 10-3/4" annulus as follows (NOTE: This procedure will provide - 1500' of annular fill-up in the 7" x 10-3/4" annulus and complies with AOGCC Regulation 20 A~AC 25.030 (d) (3) (C)): a) RIH and set RTTS 200' above squeeze perfs. b) Establish circulation conventionally through 7" x 10-3/4" annulus. If circulation cannot be established, contact Engineering for procedure to squeeze surface casing shoe. c) Pump 40 bbl HEC sweep followed by FIW (mud if necessary to kill). d) Mix and pump 390 sx Class "G" cement (approximate yield = 1.15 cf/sk = 80 bbls cement). Stop displacement with 4 bbls of cement still in 7" (-105' in 7" 26# casing). TOC in the annulus will be at- 500'. e) Hold pressure as needed {per thickening time) to prevent "U-tube" of cement into casing. 6. RIH w/ 6-1/8" bit and drill out cement squeeze. Test squeeze perfs to 1500 psi for 30 minutes (contact Engineering if pressure declines more than 10%). Continue in hole and tag cement plugback at - 5100'. Drill out cement to 5350'. Test casing and plugback to 1500 psi. POOH. 7. RIH with 6-1/8" bit and casing scraper to 3200'. POOH. 8. RU Electric Wireline Unit (EWLU) and test lubricator. RIH and perforate the lower disposal interval from 4740' - 5310'. RD EWLU. R E~E~!Er~ JUN 1 Alaska Oil & Gas Cons. Commission Anchorage ToC c~ '"' 1177 TOTRL P.02 9. RIH with the following equipment on 3-1/2" EUE 8rd DUOLINE 20 tubing: a) Wireline entry guide b) 3-1/2" OTIS "XN" nipple (Special Order 2.205" INCONEL 718) c) I joint of 3-1/2" EUE 8rd DUOLINE 20 tubing d) Crossover 4-1/2" x 3-1/2" IPC e) One Trip Hydraulic Set BAKER Permanent Packer {IPC} f) BAKER Anchor Seal Assembly (IPC) g) I joint of 3-1/2" EUE 8rd DUOLINE 20 tubing h) 3-1/2" OTIS "X" nipple {Special Order 2.313" INCONEL 718) i) 3-1/2" EUE 8rd DUOLINE 20 tubing to "X" nipple @ ~ 300' j) 3-1/2" OTIS "X" nipple (Special Order 2.313" INCONEL 718) k) 3-1/2" EUE 8rd DUOLINE 20 tubing to surface 10. Install Inconel 718 tubing hanger. Land tubing. Set packer. Secure hanger with tie down pins. 11. MIT test tubing x casing annulus to 1500 psi for 30 minutes per MGS Area Injection Order No. g, Rule 6 (Notify AOGCC for witness option). Complete and submit MIT form to AOGCC with copy to Anchorage Production Engineering. 12. Install BPV. ND BOPE. NU tree and test. Release rig. 13. Install injection line. Perform Step Rate Test as follows to evaluate injectivity. a) Establish injection with FIW at 0.5 BPM for 10 minutes. Record injection pressure. b) Increase injection rate in 0.5 BPM increments (for 10 minutes duration at each rate) up to 5 BPM. Record injection pressures at each rate. c) After the 5 BPM stage, SD pumps and record ISIP. d) Complete a summary of injectivity data via the attached table and submit to Production Engineering in Anchorage. RECEIVED JUN 1 6 199; Alaska Od & Gas Cons. Commission Anchorage A44-11 DISPOSAL WELL INJECTIVITY SUMMARY DATE: INJECTION RATE O.5 BPM 1.0 BPM 1.5 BPM 2.0 BPM 2.5 BPM 3.O BPM 3.5 BPM 4.0 BPM 4.5 BPM 5.0 BPM ISIP INJECTION PRESSURE R ¢EIVED JUN 1 G 199~) Alaska Oil & Gas Cons. Commissio~ Anchorage R RW/V~I.M/A4411 ATTACHMENT MGS A44-11 PRESENT STATUS CONVERSION TO DISPOSAL WELL QN-GO 7688' - 7701' GR-G$ 8076' - 8123' HC-HO 8399'- 8604' HE-HF 8519' - 8564' HI-HZ 8625' - 9137' FISH at 9062' PBTD at 11287' 14.8 PPG C&COS MUD 24' CONDUCTOR It 370' ~ I0'3/4° SURFACE CASING It 1912' 400' CEMENT PLUG FROM '5500' - 6100' WORN CASING INDICATED FROM 5600' - 6600' VIA VERTILOQ (2/24/90) TOP OF CEMENT at 6740' (CBL) TOP OF CEMENT PLUG at 7302'*/- CASING COLLAPSE at 7645' TOP OF FISH at 7818' OBSTRUCTION in TUBING at 8287' 81DE POCKET MANDREL at 8333' TBG CUT It 8435' GUIBERSON UNI-VII It 8369' TBG CUT at 8406' 81DE POCKET MANDREL at 8488' OTIS 'XO' SLEEVE at 8472' GUIBERSON UNI-VII at 8508 81DE POCKET MANDREL at 8639' OTIS 'XO' SLEEVE at 8472 GUIBERSON UNI-VII at 8579' EOT at 8615' RECEIVED 7' CASING 8HOE at 9211' TD at 9280' JUN 1 6 t99; Alaska 0il & Gas Cons. commisS~O~ ;~r~ '~ ~,, 1~ ATTACHMENT MGS A44-11 PROPOSED STATUS CONVERSION TO DISPOSAL WELL OTIS 'X' Nipple · 2970' (INCONEL 718, 2.313') PERMANENT PACKER (IPC) at '3000' OTIS 'XN' Nipple · 3040' (INCONEL 718, 2.205') INCONEL 718 TUBING HANGER (3-1/2' 8rd TOP & BOTTOM) (2-1/2' H BPV PREP) J~ OTIS 'X' Nipple · 300' ~ (INCONEL 718, 2.313') o~? 3-1/2' N-80 DUOLINE 20 TBG RRW/WAM/A4411.CHT 14.8 CaC03 MUI3 P&^ TOP JOB ~r/500 SX °A' ~ TOC at '231' 24' CONDUCTOR at 370' ~<:~ ~ TOC at '500' / "7" ~ /',r)%" ) __~::~_EMENT THROUGH PERES at 2000' UPPER DISPOSAL INTERVAL: 3143' - 3595' (For perforation at a later date) LOWER DISPOSAL INTERVAL: 4740' - 5310' 5350' - 5500' CEMENT PLUG TOC at 6740' (CBL) 7302' - 7818' CEMENT TOP OF FISH at 7818' P&A'd PERFORATIONS 7666' - 9137' q:::/. 7' CEMENTED w/990 SX 'G' 7' PRODUCTION CASING at 9211' EE E i J UN 1 6 1993 Alaska Od & Gas Cons, Commission Anchorage Shell Western E&P Inc. 601 West Fmfth Avenue · Sumte 800 Anchorage, Alaska 99501 July 22, 1991 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Gent l emen: SUBJECT: SUBMISSION OF THE APPLICATION FOR SUNDRY APPROVAL MIDDLE GROUND SHOAL WELL NO. A44-11 Enclosed in triplicate is the Application for Sundry Approvals to convert A44-11 to a disposal well as authorized by Area Injection Order No. 9, Rule No. 2. Injection intervals will be confined to the depth intervals which correlate with the approved disposal injection strata in SWEPI well No. A42-11 per Area Injection Order No. 9, Rule No. 2. A correlation log will be run during the conversion workover to more accurately define these depths. - Enclosed is a plat showing the location of all wells that penetrate the injection zone within one-quarter mile of A44-11 (Attachment A) per 20 AAC 25.252 (c)(1). Also attached is a table summary (Attachment B) of all wells within one-quarter mile radius of A44-11 which describes the mechanical condition of the surface casing including calculated TOC. (TOC was calculated assuming twice the hole size annular volume). Attachment C is a casing schematic of the current mechanical configuration of the well. Attachment D is a casing schematic of the proposed mechanical configuration and the proposed disposal intervals per 20 AAC 25.252 (c)(6). In reference to the requirements of 20 AAC 25.252 (c)(11), we are exempt from USDW regulations in accordance with 20 AAC 25.440. If you have any questions regarding the application or supporting documents, please contact Paul Huckabee at (907) 263-9646 or Bill Miller at (907) 263-9633. Very Truly Yours, Vo 'U V. Division Drilling/Production Engineer Alaska Division VEU/PTH/WAM Enclosures · ( STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIS~,~N APPLICATION FOR SUNDRY APPROVAE : / ./. 1. Type of Request: Abandon Suspend Operabon shutdown Re-enter suspended~fl~/~/M/ Alter ca.~n~- Repair W'~- Plugging Change apl:x'd'ed program __ Pull-'--tubing "-'~ariance P~-"rf(~rate O~-X 5. type ct We~: 16. Datum elevation (DF or KB} 2. Name of Operator Shell Western E&P Inc. 3. Address 601 West 5th Avenue, Suite 800 Anchorage, AK 99501 Development Exploratory S~'al~graphic Servme 4. Location of well at surface At top of productive interval At effective depth At total depth Plat. "A", Leg 4, Con. 16. 55.7'N & 57.42'E from center of Leg I @ 1627'N & 435'W from S.E. corner of Sec. 11, T8N, R13W, S.M. Production Interval P&A 1640'N & 580'W from S.E. corner of Sec 11, T8N, R13W, S.M. 234'N & 866'W from S.E. corner of Sec. 11, T8N, R13W, S.M. 12. Present well condition summary Total depth: measured Effective depth: Casing Structural Conductor Surface Intermediate Production Liner true vertical measured 5100' feet true vertical 4992' feet Length Size 9260' feet Plugs (measured) 8931' feet Junk (measured) Cemented 1912' 10-3/4", 40.5# J-55 2200sx 9211' 7",26-29# N-80 2350sx 116' DF feet 7. Unit or Property name Middle Ground Shoal 8. Well number A44-11 9. Permit number 67-35 10. APl number 50-733-20027-00 11. Reid/Pool MGS- No Pool Designation Cement ~5500'-5100' & ~7302'-7818' 3-1/2" tubing from 7,818'-8,615'. Packers set @ 8369', 8506', 8579'. Fish @ 9062' Measured depth True vertical depth 1912' 1911' 9211' 8883' Perforation depth: measured 7666'-9137' 10 intervals- Plugged back true vertical 7423'-8811' Tubing (size, grade, and measured depth) 3-1/2" from 7,816'-8,615' Packers and SSSV (type and measured depth) Packers set @ 7598', 8369', 8506', 8579' 13. Attachments Description summary of proposal X Detailed operations program BOP sketch 14. Estimated date for commencing operation 11/01/91 15. Status of well classification as: 16 If proposal was verbally approved Oil__ Gas __ Suspended N/A Service Disposal Injector Name of approver Date approved 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Title Division Drilling/Production Engineer Date 07/15/91 FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Uechan,cal In~g/~3'~l~e.~ ~..(~)sequent form requi--~d 10- Approved by order of the Commission Commissioner I Approvc~ No. Form 10-403 Rev 06/15/88 SUBMIIT I1~ ~'RIPLICATE MIDDLE GROUND SHOAL WELL A44-11 DESCRIPTION SUMMARY OF PROPOSAL CONVERSION TO DISPOSAL WELL PROCEDURE 1. Perforate a 1' interval with 4 JSPF in the 7" casing with the top shot at approximately 2000'. Observe for any increase in surface pressure. establish circulation conventionally through the 2. Attempt toT,' . . 10-3/4" x annulus Do not exceed 2350 psi If circulation cannot be established, attempt to reverse circulate without exceedin~l 2350 psi. If still unsuccessful, consult Engineering and prepare ~o re- perforate. Hold and isolate all returns from the 10-3/4" x 7' annulus for disposal into this well. 3. After establishing circulation, pump a 40 bbl HEC sweep followed by FIW or a heavier mud to kill the well {if .necessary). 4. If conventionally circulating, mix and pump 390 sx Class "G" cement (15.8 ppg, 5.0 gal/sk, 1.15 cf/sk). Displace with Halliburton pumps. Stop displacement with 4 bbl of cement still in the 7" casing {104' in 7" 26# casing}. Hesitation squeeze 2 bbls, leaving 2 bbls of cement in the casing and the TOC 78' below the RTTS. TOC in the annulus will be at 1300'+/- Shut in well and hold pressure for 8 hours This cement plug provides 621 of annular f~ll-up above the ' II ' 10-3/4 casing shoe and satisfies the requirements of 20 AAC 25.030(d) (3) (C). 5. GIH with a 6" bit and drill out squeeze cement. Pressure test squeezed perfs to 600 psi. Continue in hole and drill cement from 5100' to 5350' to access perforation interval. POOH and run a casing scraper to no deeper than 5350'. 6. RIH with completion equipment. Set packer at 3000'+/-. 7. Perforate the target disposal interval within the depth intervals 4740' - 5310' (the DK-DM sand). Rig down. 8. Establish injection for disposal operations. Dispose of returns isolated in step #2. Attachment ATTACHMENT B SUMMARY OF ALL WELLS WITHIN 1/4 MILE RADIUS OF A44-11 MGS WELL NUMBER A44-11 Al1-12 A11 - 13RD A12-12 A13-12 A33-11 A34-11 A41-11 A42-11 A42-14 A43-11 A44-02 -CASING CASING HOLE TOP OF DEPTH SIZE SIZE CEMENT (FEET) (INCHES) (INCHES) (FEET) 1912 10.75 2275 13.375 1776 10.75 1895 10.75 1593 13.375 1712 13.375 1644 13.375 1808 13.375 1847 10.75 1858 10.75 1609 13.375 2038 13.375 15 18.5 15 15 17.5 17.5 17.5 17.5 15 15 18.5 17.5 231 725 89 439 95 1045 70 1076 166 412 334 394 ATTACHMENT C MGS A44-11 PRESENT STATUS CONVERSION TO DISPOSAL WELL 14.8 PPG CaCO3 MUD 24' CONDUCTOR at 370' 10-3/4' SURFACE CASING at 1912' 400' CEMENT PLUG FROM '5500' - 5100' WORN CASING INDICATED FROM 5600' - 6600' VIA VERTILOG (2/24/90) TOP OF CEMENT at 6740' (CBL) TOP OF CEMENT PLUG at 7302'*/- GN-GO 7666' - 7701' CASING COLLAPSE at 7646' TOP OF FISH at 7818' GR-G$ 8076' - 8123' OBSTRUCTION in TUBING at 8287' SIDE POCKET MANDREL at 8333' TBQ CUT at 8436' GUIBERSON UNI-VII at 8369' HC-HD 8399' - 8604' TBG CUT at 8406' 81DE POCKET MANDREL at 8466' OTIS 'XO' SLEEVE at 8472' GUlBERSON UNI-Vll at 8506 RRW/WAM/A4411 HE-HF 8519' - 8554' HI-HZ 8625' - 9137' FISH at 9062' PBTD at 11287' 81DE POCKET MANDREL at 8639' OTIS 'XO' SLEEVE at 8472 GUIBERSON UNI-VII at 8679' EOT at 8615' 7' CASING SHOE at 9211' TD at 9260' TOC at '1300' ,~ ooo. / [ 5350' - 5500' CEMENT PLUG 7502' - 7818' CEMENT 9000' - 9100' FISH 7' CEMENTED w/990 SX 'G' 7' PRODUCTION CASING at 9221' AT TACHMENT D MGS A44-11 PROPOSED STATUS CONVERSION TO DISPOSAL WELL TOP JOB w/500 8X 'A' 24' CONDUCTOR at 370' 10-3/4' SURFACE CASING at 1912' 40.6# J-66 CEMENTED w/2200 8X PERMANENT PACKER at '3000' UPPER DISPOSAL INTERVAL: 3134' - 3595' (BC-BG SAND) (For perforation at a later date) LOWER DISPOSAL INTERVAL: 4740' - 5310' (DK-DM 8AND) TOC at 6740' (CBT) 7818' - 9062' JUNK RRW/~M/A4411.CHT MGS A-44-11 CASING & CEMENT DETAIL SURFACE (10 3/4") CAS I NG: C EME NT: SPACER: TOP JOB: 1912', 10 3/4",40.5~, J-55 1700 sx. Class "A" (15.4 ppg). No returns to surface. 30 bbls water 500 sx. Class "A" (15.5 ppg). No returns to surface. PRODUCTION (7"): CASING' 9211', 7", 29 & 26~, N-80, BTC (bottom 22 joints are 29#}. CEMENT: 1600 sx. Class "G". Cement flash set while displacing at 2600'. VEU/kka A4411 Well Summary/VEU2 Page 2 ( Shell Western E&P Inc. 601 West F~fth Avenue · Suite 800 Anchorage, Alaska 99501 June 11, 1990 Alaska 0il and Gas Conservation Commission ATTN: Elaine Johnson 3001 Porcupine Drive Anchorage, Alaska 99501 SUBJECT: TRANSMITTAL OF REQUESTED INFORMATION REGARDING THE SWEPI OPERATED MIDDLE GROUND SHOAL FIELD Dear Ms. Johnson: In a recent telephone conversation you discussed with Ms. Susan Brown-Maunder information that would be helpful to you if we could provide it. Enclosed, for your convenience and use, are the following: location surveys showing the location of Platform A list of conductor/well locations (in relation to the SE corner of Sec. 11, T8N, R13W) for Platform A wells location survey showing the location of Platform C list of conductor/well locations (in relation to the SE corner of Sec. 23, T8N, R13W) for Platform C wells In addition you requested a revised copy of the Well Completion or Recompletion Report and Log (10-407) for the recently completed well C21-23. The well 'location at the top of the producing interval and the well location at total depth as been changed to reflect the actual surveyed location. If you have any further questions regarding these matters, please continue to contact Susan Brown-Maunder at (907) 263-9613. Very Truly/Yours, W. F. Simpson Manager, Regulatory Affairs Alaska Division WFS/SBBM/vj Enclosures cc: Susan Elsenbast-AOGCC \LETTERS\AOGCC\061190 .DOC RECEIVED JUN 1 ]990 Anchoraga MIDDLE GROUND SHOAL Platform "A" WELL/CONDUCTOR LOCATIONS Leg i - Center of Leg I @ 1627'N & 435'W from SE corner of Sec.11, T8N, R13W, S.M. A 12-01 I 1632'N & 437'W from SE corner A 11-01 2 1632'N & 432'W " " " A 43-11 3 1630'N & 430'W " " " A 34-11 4 16 25' N & 430' W " " " A 34-14 RD 5 1622'N & 433'W " " " A 22-14 6 1622'N & 437'W " " " A 12A-01 7 1625'N & 440'W " " " A 13-01 8 1630'N & 440'W " " " Leg 2 - Center of Leg 2 @ 1681'N & 372'W from SE corner of Sec.11, T8N, R13W, S.M. A 42-11 9 1685'N & 374'W from SE corner A 44-02 10 1685'N & 370'W " " " A 42-14 11 1683'N & 368'W " " " A 41A-11 12 1678'N & 368'W " " " A 11-12 13 1675'N & 371'W " " " A 11-13 RD 14 1675'N & 375'W " " " A 31-14 15 1678'N & 378'W " " " A 44-11 16 1683'N & 378'W " " " Leg 3 - Center of Leg 3 @ 1620'N & 321'W from SE corner of Sec.11, T8N, R13W, S.M. Leg 4 - Center of Leg 4 @ 1566'N & 383'W from SE corner of Sec.11, T8N, R13W, S.M. A 33-11 25 1571'N & 385'W from SE corner A 14-01 26 1571'N & 381'W " " " A 12-12 27 1568'N & 378'W " " " A 24-01 28 1564'N & 378'W " " " A 13-12 29 1561'N & 381'W " " " A 33-14 30 1561'N & 385'W " " " A 41-11 31 1559'N & 388'W " A 23-01 32 1569'N & 388'W " 13 1990 ~;laska Oil & Gas Con~. Gommi$~ion Anchomgra SBBC/mgs A (,,, (r I T9N S.U. .,. I [ · 'e · i· · · · : ·, · · · ~ ADL 18754 · · · . . tONe. 151° 2.' 44.005" PLATFO~I~ LOCATIOI/ r · . .: ,j . ST&TE ~lO COOED. ~ ' 3 . ~'~ Y,2,485,840 G 5' ,-~ '.? .................... I~ 14 13 I[ II IT , . ~T ~ Z6 25 .30 34 ~S ~&' IVtD REdE , : ' LOCATION OF S~Lr CONTAIN[O ~,1~o ~il & Gas Cons, t ammisslon PRODUC~NO PL.':T FORM T 8 N S.M. ' ~nchoTa~ J SHELL MIDDLE GROUND,, ,, S}IOAL ~ T 7N S.M t ~ ~ PLATFORM A I COOK INLET, ALAS,,A APPLIC,t,,TION BY SHELL OIL CO. o 4003 eooo 12000 3 I0 !1 II 14 T. 8 N., R.13 W., S.M. II LEG NO. I.,~/~'' 14 LEG NO. I x = 232,7B 3 Y = 2:,485,845 1627' I',1 I~ 435'W FROM THE SE COR. OF SEC. II, TBN, RISW, SM LEG NO. 2 LEG NO. PLAN£ COORDINA T£S X= 2:32,846 X= 2:52,896 Y = 2,485,897 Y = 2,485,835 PUBLIC LAND 1681' N Ek .'572' W FROM THE SE COR. OF SEC. II, TBN, RiSW, SM. DES CR'I P T/ON 1620'N Et 321' W FROM THE SE COR. OF SEC. iI~ TBN, RI3W, SM. LEG NO. 4 X= ?-32,833 Y =?.,485,783 1566'N Et 383'W FROM THE SE COR. OF SEC. II, TBN,RI3W~ S.M. GEODETIC COORDINATES {! LAT'- 60°47'44 839" LAT.- 60°47'45.$68'' LAT.- G0°47'4~. 7G8'' LAT - 60°~7'44.244'' LONG.-151°29'45.112''. LONG.-151° 29' 43.942" LONG.-151°29' 42.~B99'' LOI','G.- 151° 29' 44.154" $"P.~ ~ SEDE$ 7- 4153-: ," [~'~'~,~ :~'~ H.~ ,:). .~_, ~ SCr,,g~__ l"= ~ooo' u ~,~.c,:.,-D ~,. ,.,, ,: u SHELL 0[; COP~i'"""~','-~u"'~' t OCATION OF STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Class~hcat~on of Serwce Well OIL I~_.~ GAS [] SUSPENDED ~ ABANDONED [] SERVICE 2 Name of Operator 7 Permit Number SHELL WESTERN E&P, lNG, 67-35/90-143 3 Address 601 WEST FIFTH AVE. SUITE 810 8 APl Number ANCHORAGE~ AK 99501 50- 733-20027-00 4 Location of well at surface Platform "A", Leg 4, Conductor 16 @ 55.7' N 9 Unit or Lease Name and 57.42' E from Center of Leg 1 ~ 1627' N & 435' W from Middle Ground ShoaL At TopProduc,ng IntervalSE Corner Sec 11, TSN, R13W, S.M. 10 Well Number @ 1002' S and 179' W of surface location A44-11 At Total Depth @ 1384' S and 431 ' W of surface location 11 F,eld and Pool MGS "G" POOL 5 Elevation ~n feet (md~cate KB, DF, etc ) 6 Lease Designation and Serial No 116' DF ADL 18754 12 Date Spudded 13 DateTD Reached 14 DateComp,Susp orAband 15 Water Depth, ,f offshore 116 No of Complet~ons (~ '7/(:~//~ --- 3/12/90 73' feet MSL/1 17 Total Depth (MD+TVD) 18 Plug Back Depth(MD+TVD) 19 D~rect,onalSurvey 20 Depth where SSSV set 21 Th~cknessof Permafrost 9,260' 5,100' I YES [] NOir} N/A feet MD N/A 22 Type Electric or Other Logs Run VERTI LOG, GR/CCL 2'3 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT PER FT GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 10-3/4" 40.5# -55 1912' 15" 2200 sx NONE 7" 26# 1-80 0 ' 8331 ' ........ NONE 7" 29# -80 8331 ' 9211 ' 9-7/8" 1600 sx NONE 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD ~nterval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 3-1/2"9.3N-80ELE 0.0'-274' GUIBERSON UNI-VII @8,36 SEE ATTACHED PERFORATION SUMMARY 3-1/2"9.3N-55E[E 274'-8615' 8,506' & 8579' 26 ACID, FRACTURE, CEMENT SOUEEZE, ETC DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED SEE ATTACHED PLUGGINS SUMMARY 27 PRODUCTION TEST Date F~rst Production Method of Operation (Flowing, gas I~ft, etc ) N/A N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO I N/A N/A TEST PERIOD I~ ............ Flow Tubing Cas,ng Pressure CALCULATEDm~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press N/A N/A 24-HOUR RATE ~' ............ 28 CORE DATA Br,ef description of I~thology, porosity, fractures, apparent d,ps and presence of od, gas or water Submit core ch~ps N/A RECEIVED 'APR 2 0 1990 Alaska Oil & Gas Cons. Commlsslo. ~chom~ 9' Form 10-407 Submmt in duplicate Rev 7-1-80 SBBL/aogcc.041890a/1 CONTINUED ON REVERSE SI DE 29 30 N/^ NAME GEOLOGIC MARKERS MEAS DEPTH TRUE VERT DEPTH , MATION TESTS Include ,nterval tested, pressure data. all flu,ds recovered and gravity, GOR. and t~me of each phase 31 LIST OF ATTACHMENTS DALLY REPORT OF OPERATIONS~ ABANDONME_NT DIAGRAM 32~"~l hereby ~~rect to the best of my knowledge --t'~'g ned ...... T, tieD, ,!. INSTRUCTIONS General' Th~s form ~s designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1 Classification of Service Wells' Gas ~njection, water ~nject~on, steam injection, a~r ~njection, salt water d~sposal, water supply for injection, observation, ~njection for in-s~tu combustion Item 5 Indicate which elevation is used as reference (where not otherwise shown) for depth measurements g~ven ~n other spaces on th~s form and in any attachments Item 16 and 24 If this well ~s completed for separate production from more than one interval (multiple completion), so state in ~tem 16, and in ~tem 24 show the producing intervals for only the ~nterval reported ~n ~tem 27 Submit a separate form for each additional ~nterval to be separately produced, showing the data pertinent to such ~nterval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ~ng and the location of the cementing tool. MGS A44-11 (4/4/90) CORROSION INHIBITED INLET WATER 10-3/4' at 1912' 400' CMT PLUG FROM,-,., 5500' to 5100' BAD CASING INDICATED FROM 5600' - 6600' via VERTILOG 2/24/90 GN - GO 7666' 7701' GR - GS 8076' 8123' HC - HD 8399' 85O4' HE - HF 8519' 8554' TOP OF CMT PLUG at-,., 7302' CASING COLLAPSE INDICATED at 7645' ~TOP of FISH at 7818' CARBIDE JUNK (WASHOVER SHOE CUTTER KNIVES, GRAPPLE) ' --OBSTRUCTION in TUBING at 8287' --S~DE POCKET MANDREL at 8333' TBG CUT at 8345' GU~BERSON UN~-V~i at 8369' TBG CUT at 8406' SIDE POCKET MANDREL at 8466' OTIS 'XO' SLEEVE at 8472' GUIBERSON UNI-VII at 8506' SIDE POCKET MANDREL at 8539' OTIS 'XO' SLEEVE at 8575' GUIBERSON UNI-VIi at 8579' FISH at 9062' HEMLOCK PERFORATIONS 8625' - 9137' IPBTD at 9151 TD ar9260 7' CASING SHOE at 9211' (HI- HZ) PLUGGING SUMMARY A44-11 400' Cement Plug from - 5100' to 5500' Cement Plug from - 7302' to 7818' Cement Plug from - 9151' to 9260' 041890.A SUMMARY OF PERFORATIONS A44-11 ZONE TOP ZONE MD TVD GN-GO 7666 7423 GR-GS 8076 7795 !1 !1 II HC-HD 8399 8096 II II II HE-HF 8519 8211 HI-HK 8625 8314 HK-HN 8669 8356 HN-HR 8832 8515 HR-HZ 8986 8664 ZONE BOTTOM PERF. INT. MD TVD DATE GUN 7666-7701 7701 7454 8/67 TT 4JSPF 8076-8088 8129 7844 " " 8101-8123 " " " " 8399-8449 8504 8196 " " 8467-8504 " " " " 8519-8554 8554 8245 " " 8625-8656 8669 8356 " " 8669-8820 8832 8515 " " 8832-8986 8986 8664 " " 8986-9137 9137 8811 " " 041890.A Shell Western E&P Inc. 601 West F~fth Avenue · Suite 800 Anchorage, Alaska 99501 April 20, 1990 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Gentlemen' SUBJECT: SUBMISSION OF THE REPORT OF SUNDRY WELL OPERATIONS AND WELL COMPLETION OR RECOMPLETION REPORT FOR MIDDLE GROUND SHOAL WELL NO. A44-11. Enclosed, in duplicate, are the Report of Sundry Well Operations and the Well Completion or Recompletion Report and Log for MGS Well No. A44-11. The workover included pulling tubing and was discontinued March 11, 1990 and the well was Suspended on March 12, 1990. If you have any questions, please call Ms. Susan Brown-Maunder at (907) 263-9613 or Mr. Paul Huckabee at (907) 263-9646. Very truly yours, W. F. Simpson Manager Regulatory Affairs Alaska Division WFS/RAF/af Enclosures RECEIVED APR 2 0 1990 Alaska 0il & Gas Cons, commisslOn Anchora~ A44-11.041890 ( STATE OF ALASKA M(jb 0 R16 IN^ i_ ALASKA OIL AND GAS CONSERVATION COM olON REPORT OF SUNDRY WELL OPERATIONS Sbmulate __ Pluggmng __ Perforate ~ Pull tubing ~ Alter casing ~ Repar well I Other 10perabons performed Operabon shutdown 2 Name of Operator SHELL WESTERN E&P, INC. 601 WEST FIFTH AVE. SUITE 810 ANCHORAGE- AK 99_~{31 5 Type of Well Development __ Exploratory ~ 3 Address Strabgrapmc ~ Serwce -X-- 4 Locabon of well at sudace Platform "A", Leg 4, Conductor 16 ~ 55.7' N 6 Datum elevation (DF or KB) 116' DF 7 Un.t or Property name Hiddl e Ground Shoal 8 Well number and 57.42' E from Center of Leg 1 ~ 1627' N & 435'W from , T8N, R13W, S.M. Att°p°~)r°C(~'e~rv~t ~ 1002'S and 179' W of surface location At effecbve depth At total depth 1384' S and 431' W of surface location 12 Present well condition summary Total depth measured 9,260 ' feet Plugs (measured) true verbcal feet A44-11 9. Permltnumber/approvalnumber 67-35/90-049 10 APl number 50-- 73;}-20027-00 11. Reid/Pool Middle Cre'c~d ~he:! feet Effecbve depth' measured 9,151 ' feet Junk (measured) true verbcal feet 7,818' Casing Structural Conductor Surface Intermediate Producbon Liner Perforabon depth Length S~ze Cemented 1912' 10-3/4",40.5# J-55 9211 ' measured 7666' - 9137' true vertical 7423' - 8811' Tubing (size. grade, and measured depth) Measured depth True verbcal depth 2200 SX 1,912' 7", 26-29# N-80 2350 SX 9,211' RECEIVED 3-1/2" Tubing APR 2 0 1990 ~taska 0il & Gas C~IS, ~n Packers and SSSV (type and measured depth) Guiberson Uni-Vll ~ 8,369', 8506', & 8579' Anchoral~ "' 13. Sbmulatlon or cement squeeze summary The Workover to pull the tubing was not completed. The Well was instead suspended and the workover cancelled. Intervals treated (measured) Treatment descnpbon ~ncludlng volumes used and final pressure N/A 14. Representative Daily Average Production or Injecbon Data O~l-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Pnor to well operation N/A Subsequent to operabon N/A 15 Attachments Copies of Logs and Surveys run I Dally Report of Well Operations ..Z. 16 Status of well classlflcatmon as. O~lI Gas ! Suspended Service 17. I hereby certify t,~at the foregoing is true and correct to the best of my knowledge. /I Signed J/~//(~~ Title Division Operations Nanager Form 10-404 Rev 06/15/88 SBBL/aogcc.041890 Page 1 Date 04/2 0/90 SUBMIT IN DUPLICATE DAILY REPORT OF OPERATIONS A 44-11 DATE DESCRIPTION 02/04/90 Prepare for workover operation, review current well condition. Well began backflow operations on 01/31/90. Annulus pressure at 2500 psi. Initial backflow rate @ 1300 BPD. Begin injecting NALCO VISCO 3631 @ 20 gpd for H2S neutralization on 01/31/90. Backflow pressure this day at 190 psi tubing, and 25 psi annulus at 1200 bpd. Upstream from VISCO 3631 injection point H2S is at 490 ppm, D/S at 25 ppm. Shut-in well, record 1900# SIP on annulus, tubing N/A. Begin injecting filtered inlet water ~tEt\~ to displace H2S affected water back to formation for safe %1~ wireline operation. Shut in well. Rig up slickline and run in hole with 1.9" weight bar for depth determination. A~t%%% _,/~mg bottom at 9080~ {WL depth), Pull out of hole. Run in ,O~'/~v~ c.~tt~)~le with 2.75" gauge tool in preparation to open sliding '~ '.~%~'~' sleeve, gauge tool stopped at 340~ and 402~. Pull out of ~i~\~*~'~_~ hole with gauge tool. Shut in well for night. Tubing and annulus built to SIP at 2100# in short time, indicating probable communication near surface. 02/06/90 Plumbing hydraulic control lines for BOPE. Fabricating stairways for access to Northwest Brucker unit (safety item). Rebuilding steam lines on rig floor. Install handrails. Hooking up TOTCO drilling recorder system. Install piping for the tri-flow degasser. Replace boat mooring leg strap on south side of platform. Prepare to reconnect J-tube access in compressor room for mud pits. 02/07/90 Complete installation of TOTCO drilling recorder. Install hydraulic control lines for BOPE. Wire utilities from leg three. Maintenance on Shakers in mud pits. Fabricating spool for J-Tube access in compressor room. Cleaning sand from Mud Pits. Fabricating stairway for Brucker access. Begin A.M. tour at midnight. 1TOTCO, 12 Grace drilling onboard for workover operations. Systems and alarms, Platform orientation and production/drilling operations. Working on steam lines to rig. Receive Coil Tubing unit onboard. Boat activity hampered by heavy fan ice in Cook Inlet. Clean and check rig generators. 02/08/90 Install liners in #2 mud pump. Repair steam lines, obtain steam to rig floor. Fabricate Degasser discharge line to pits. Rig up dual discharge line from tubing and annulus to backflow system. Service and install Kelly bushing. Complete stairway access to Northwest Brucker. Breakdown, service and reassemble mud choke assembly. Plumb service air to rig floor. Operate controls. O.K. Replace freeze ROSWO. 3 - 1 - DATE 02/09/90 02/12/90 02/13/90 02/14/90 DESCRIPTION broken pipes in mud pits for filtered inlet water. Rig up to lift J-tube connecting spool in compressor room. Continue to repair rig floor components. Continue to prepare pits mud pits for service. Fabricating stand for Mud Choke. Set pipe & blind rams in substructure, thawing out assembly. Complete fab of J-tube spool. Hanging rams in compressor room. Rig up Baker filtration system to mud pits. Run #1 and #2 generators. Operate drawworks. Continue replacing freeze damaged water lines in mud pit area. Install liners in #1 mud pump. Service valves in both mud pumps. Work on H2S alarm system. Held H2S alarm. All hands responded well. Rig up and clean reserve pit in mud pit room. Insulate around rig subbase. Check base bolts on derrick. Prepare to level derrick. Repair heater units on rig floor & subbase. Make up mud choke to fabricated stand, set on rig floor. Charge bottles for accumulator with nitrogen. Two bladders found defective. Run mud pump #2 for check out. Work on pump #1 switch gear. Fabricating safety guards for Derrick ladders, pitcher nipple, choke tees. Install handrails on mud dock and pipe rack area. Plumb oil drain line from drawworks to production oil drain. Work on DC motors for drawworks. Operate same. Mixing Calcium carbonate workover fluid at 14 ppg, 450 bbl system. Due to heavy ice conditions in Cook Inlet. Continue working on Derrick safety repair items. Prepare to rig up coil tubing unit. Fabricate chokeline. Build derrick ladder safety gages. Electrician working on DC traction motors. Mix CAC03 workover fluid to 450 bbl system. Function test blind rams. Build handrails. Rig up Arctic recoil, {Coil tubing system). Rig up HOWCO pumping unit. Rig up chokes on 3.5" x 7" and 1.5 x 3.5 annulus. Rig up to pressure test CTU lubricator and BOPE, HOWCO lines, annulus chokes. Continue to pump 14.5# CAC03 kill fluid at 0.67 bpm, 4700# through coil tubing with tubing head at 8277~. Direct 275 bbls, displaced well fluids {8.55# filtered inlet water} to platform backflow system. Monitor returns for entrained H2S. Wellhead sample was 0-115 ppm and 0-125 ppm downstream of H2S chemical treatment point. Circulate out light spots taking returns to pits. Monitor well for flow. No flow or build-up observed. Pull out of hole with coil tubing while circulating. Observe light fluid returns at 3120~ Stop and circulate fluids until returns were @ 14.5#. P~ll out of hole with coil tubing and stand by to monitor well. Monitor well for flow. Purge coil tubing of kill fluid taking returns to pits. Prepare to ROSWO.3 -2- DATE 02/15/90 02/16/90 02/17/90 DESCRIPTION nipple up BOPE. Clean riser and flange assemblies. Rigging down coil tubing unit at report time. Finish rigging out coil tubing unit. Lay down lubricator. Monitor well flow conditions. Install blind flange on the 3500 FWI injection line at well head. Monitor well. Has small flow back. Rig back up lines to circulate. Build 20 bbl. {15 ppg) and circulate down tubing. Check for flow. All o.k. static for 2.5 hrs. while getting ready to pull tree. Remove 6" 5000# tree. Not able to use back pressure valve. The BPV threads were all gone in hanger, but was able to screw the 3.5" O.D. by 6 ft. pup joint into the hanger and tighten it up. Nipple up 13.625" 5000 lb. cameron gates and annular preventer. Hooking up the choke and kill lines. Finish hooking up all lines to BOPE. Hammer up all flanges pick up and make up the Kelly, swivel and safety valves. Screw into well head hanger with Teflon on threads. Fill lower part of riser with mud then finish filling with water. Closed pipe rams and was able to get 2000 psi. On stack but was losing fluid around hanger. Pressured up a couple of more times, but found no leaks on stack, but still leaking around hanger. Had to pull and clean all the electrical switches on drillers remote control closing unit. Lay Kelly. Test choke manifold. Found valve leaking below choke. Pull apart and repair same. Rig up Dia-Log. Make up lubricator with 3" ID swab valve. Pick up 2.75" OD Jet cutter with 15' 1.625" sinker bar. Went in slow due to heavy stiff mud. Quit at 875'. Pull out of hole. Pick up two more sections of lub. and 15 more ft. of sinker. Ran back in but still going slow. Got down to 1030' and almost quit. Pull out of hole and lay down 2.75" OD" jet cutter. Ran back with 1.875" OD guide. Then rigged up a bleed off on lubricator. Down to 5000 ft. at 5 a.m. and looking better. Continue working W.L. down to 8436' Mud seems to be very stiff. Continue welding and instaliing 10.75" flow line. electricians working on rig telephone system. Pull out of hole with W.L. Not able to get any deeper. Pick up 2.625" OD jet. Trip in hole and cut tubing at 8406' T.O.H. No change in casing pressure below hanger. M~ke up shot run #2 RIH. to 300 ft. when we lost the reading on C.L. Pull back up and repair then rerun and make cut off at 8345'. Pull out of hole, re-dress jet cutter and run in hole. Make last cut at 7570'. Pull out of hole and rig out Dialog. Rig up to pull and lay down tubing. Fill tubing and break circulation. Pulled up and layed down hanger without any problems, single out and lay down tubing. ROSWO.3 -3- DATE DESCRIPTION 02/18/g0 Finish pulling out of hole and laying down a total of 248 its. of 3.5 EUE 8RD water injection string plus a sliding sleeve and 13 ft. on the 24gth joint. The first fifty joints had more black scale than most. Then the last 25 joints had quit a bit. Every third joint was extra tight and some of them crushed in a little at the tong dies. Maybe the pipe is a little thinner. Pick up and install wear bushing. Rig up HOWCO to pressure test the BOPE. Test the pipe rams, blind rams, choke, HCR, choke lines, lines back to the mud pumps, choke manifold and kill lines all to 5000 psi. Tested the Kelly hose and it blew up at 4500 psi. Had to tighten the mud cross on the stack. The Air Pumps on the accumulator were froze up and had to be repaired. Two of the three way valves were out of adjustment and wouldn't work. While testing the BOPE the electrician {Jim Fritz) made repairs on electrical system. ~~g Installed rotary throttle, blower, and tightened ~C~ connections in Panel. The welders worked on the ladder back scratchers and worked on repairs and drawings for _ ,~iO~O derrick. Tested the Annular to 3100 psi. Finished '~~° __~_~l~testing and installed wear ring. Picked up Tri-State oe~sCo~s'C°m~'~'Vtools as follows. Lip guide with hollow bowl (3.5" by l~sk~U~-clno~ 4.5") mill , 5.75" OD Bowen overshot. Dressed for 3 5" ,J~,,'J'~ ' II F~sh, Bumper sub, oil jars and six 4 3/4 on top ' Followed by 3.5" D.P. 02/19/90 Finish picking up 155 joints of 3.5" 13.3 "E" D.P. followed by 3.5" 13.5 shell grade "G" D.P. to 6878'. Replace two safety escape landings at derrick board level. Build a extended walk way from the derrick ladder to the opening of the derrick man work board, with hand rails and toe boards. Install ladder safety guards on east side of derrick. (back scratchers). Finish picking up 3.5" drill pipe and running in hole. Started taking wt. at 7318'. Circulate bottom up had 13.4 ppg on mud weight while circulating. Build mud wt. back to 14.5 and lower yield to about 28. Ran in to 7537'. Pipe taking wt. Up to 50,000 lb. Mud acts very stiff on bottom. Circulate to clean up bottom. Before latching onto fish at 5 a.m. 02/20/90 Circulate and condition mud. Break out 4" kelly hose from swivel. Make up and install 4" by 2" adaptor union and 2" kelly hose. Work over and mill off top of fish at 7570. Jared a couple of times and pulled 100,000 over. Packer came free. Pull up 40 ft. and closed well in. Install grating around a open section of walk way with hinged cover. Install hand rails and safety rails at crown. Circulate bottom up and check well for flow. Had a very small flow about pencil size but decided to try pulling out hole. Pulling Packer from 7570. Well swabbing 3 bbls. On first stand. Rigged up small hose and fill drill pipe. Took two bbls to fill D.P. back up. Pulled 7 stds. and had gained total of 5 bbls. Checked flow and it ROSWO.3 -4- DATE 02/21/90 02/22/90 02/23/90 DESCRIPTION was still about same. Pick up Kelly and make up Kelly hose. Circulate and build mud wt. to 14.8 ppg. That will increase Hydrostatic about 109 psi at 7000 ft. finished getting mud in condition at 5 a.m. Pulling out of hole. Well still swabbing. While pulling the 11 Th. std. it pulled 10,000 over wt. then came free. Finished pulling out. Recovered 20 ft. 3.5" tubing with part of the Guiberson Uni-Packer VII. The bottom set of slips and the rest of the Packer were left in the hole. Lay down packer and over shot. Operate blind RAMS. Rig service. Make up BOWEN 2.993" tubing spear, with 3.77 ft. extention, drain sub, bumper sub. JARS . 6-D.C.'s. and D.P. Trip in hole and circulate bottom up. Weighted up light spots to 14.8 ppg. Latch into fish. Work pipe from 20,000 over, and continue increasing over pull up to 130,000 over pull. Set JARS off up to 60,000 over pull. Fish finally came free. T.O.H. Had recovered the lower Packer slips and laying down tubing Fish at 5 a.m. Finish pulling fish. Recovered 2 joints of 3.5" tubing and 10 inches of the third joint. Tubing pulled into lay down spear. Function test blind rams. Clean floor. Pick up BOWEN 5.75" O.D. over-shot dressed with a 3.5" grapple. Trip in hole stop 30 ft. above fish. {7627}. Slip and cut drilling line and circulate. Circulate and condition mud. Had safety meeting on escape capsule. Trying to wash over fish at 7657. Taking wt. 10 ' high. Act like overshot was going over fish but was slipping off also had about 30 ft. of heavy fill. Fill trip tank and trip out of hole. The 5.75" overshot came out egg shaped and showed no signs of a fish being up inside of grapple, the outside of overshot was marked up like we had pulled through something tight. Indicating the casing could be collapsed. Checking availability of the Husky for more fishing tools. Trip in hole with 6" OD flat bottom mill, bit sub, bumper sub, and six 4.75" O.D.D.C.'s. Wash down the last 6 singles 7441/7640 started taking wt. at 7640. Didn't try to clean out any with mill. Circulate and condition mud at 5 a.m. Circulate and condition mud at 7640. It has been taking about 150 sxs. of calcium carbanate to wt. Up water cut mud on each trip while out of the hole we get a pencil size flow even with 14.8 ppg mud in hole. Trip out of hole and lay down 6" flat bottom. Junk mill. Check blind rams sub, JARS, six x 3/4" O.D. D.C.'s add JARS, 24 4-3/4" OD D.C.'s. Turn in hole Install new line guide rollers. Circulate bottom up. clean up sub floor and well head room in preparation to install mouse hole. Install mouse hole. Swedge took weight at 7645'. Swedge out to 7653. Had to stop due to top of Fish at 7657. All ROSWO.3 -5- DATE 02/24/90 02/25/90 02/26/90 DESCRIPTION indications of swedging shows casing to be collapsed. Trip out of hole. Finish trip out of hole with swedge. Function test Blind Rams. Pick up 6" OD swedge and trip back in with same B.H.A. Circulate bottom up and condition mud. Started taking weight with 6" OD swedge at 7638. Swedged out to 7653. the casing at 7640 continued to pull tight even after working through it for several hours. It would take weight. Going down up to 60/70,000 then pull tight coming up. Tried circulate and not circulate while swedging hole got some better. Blow down 2" Kelly Hose. Lines, Turn out of hole, function blinds, pick up 6" flat bottom mill and baker casing scraper. Trip in hole. circulate and clean up casing for logging. Trip out of hole. No noticeable drag on scraper in or out of hole. Finish turning out of hole. Function test blind rams and clean up floor. Rig up Western Atlas wire line unit and log GR-CCL on first run. Logged from 7600 ft. pull out of hole, rig up wireline pack off and run to 7600 ft. Log with the casing inspection vertilog. Pull out of hole. Rig out loggers. Function test blind rams. Pick up HOWCO retrievable B.P. and RTTS. T.I. while analyzing vertilog in Anchorage. Well was flowing a small stream, so didn't wan't to wait too long to trip in, but had to run slow due to Packers. Circulate bottom up and condition mud. Trip out of hole and lay down RTTS. Finish laying down HOWCO tools. Function test blind rams, and trip in hole with 5-3/8" mill, 2- junk subs subs, bit sub, bumper sub, jars, 6-4 3/4" D.C. Was able to trip in to the top of the Fish, at 7657'. Mill approximately 6" off top of fish. Circulate bottom up and condition mud. Took 60 boxes of weight material to maintain 14.8 ppg. Most of the time it takes about 150 sacks. Trip out of hole. Lay down mill. Function test blind rams. Pick up 5 7/16" OD overshot with extention. Bumper sub JARS, 6-4 3/4" OD D.C.'s and after running 17 standards of D.P. and making up the 18th. standard the drill pipe broke off 34" down from face of box in the slip area also where a wash out was starting. The wash out was about 5/8" horizontal and about the thickness of a hacksaw blade. Was able to install a safety clamp around drill pipe. Put heavy sling around and under clamp then pull it up and lay down. Finish tripping in hole. Circulate bottom up. Overshot started taking wt. 3 ft. above. Fish at 7634' too much torque to rotate overshot. Trip out of hole pick up 4 11/16" dressed with 3 1/2" grapple with packoff and a 3 ft. extention but no hollow mill trip in hole, circulate bottoms up. Trying to work o/s over fish. But no luck started taking weight at 7654. Washed and rotated down to 7666' D.P. measurements. Never did get a pump increase, ROSWO.3 -6- DATE 02/27/90 02/28/90 03/01/90 DESCRIPTION but was very tight. Fill trip took. Blow Kelly and lines. Trip out of hole. Finish turning out of hole. Close and check blind rams. Lay down 4-11/16" overshot. Recovered approximately 5 ft. of tubing that was jammed into the extention of the overshot. Had lost the 3.5" grapple. Pick up 6" OD tapered swedge, drain sub, bumper sub, JARS, 6-4 3/4" D.C.'s, ACC Jars and 24-4 3/4" D.C.'s. Trip in hole. The 6" swedge started taking wt. at 7640. Worked through tight spot to 7652'. Then went on to 7658' without noticeable drag with the tightest spot at 7645' worked through several times but still had about 50,000 over pull while coming up through 7645. continue circulating bottom, conditioning mud and cut 100 ft. on drilling line and rig service. Trip out of hole. close well in and install hand rails on Derrick ladder landing and patch hole. Will install trap door at crown walk around when weather is fit and that will finish the derrick safety repair list. Finish tripping out of hole. Function blind rams and lay down 6" swedge. Pick up 6 1/8" OD swedge and trip in hole with same bottom hole assembly as above. The 6 1/8" swedge started taking wt. at 7838. Two ft. higher than with the 6" swedge. Still working the 6 1/8" at 5 a.m. and have not made any hole. Couldn't make any hole with the 6 1/8" swedge. Trip out of hole. Stand back extra D.C.'S. Function test the Blind Rams. Lay down the 6 1/8" mill. Rig Service. Repair crown safety devise. Cut off and adjust arm that goes to brake and slave cylinder. Works fine now. Pick up 5 3/4" OD concave mill, bumper sub, JARS, 6-4 3/4" O.D. DC's and trip in hole. took about 2000# wt. or drag at 7655 then was free down to 7659. Started milling at 7659. Milling. Pick up close well in. Install trap door in Derrick crown. Walk around. Milling with the 5 3/4" O.D. concave mill from 7659/7666. The mill stopped cutting at 7666. Pull up and set Kelly back. Had a little over pull, {25,000) at 7650. blow down Kelly and fill trip ticket. Pull 12 standards. Install safety rails across derrick just below the sheaves. This takes care of all safety items in the derrick except the safety cage around the derrick ladder, above the crown walk around. Finish tripping out of hole operate rams. Lay down 5-3/4" concave mill. Trip in hole 5-7/16" hollow mill guide, overshot, extention sub, bumper, JARS, 6 - DC's pump out sub, didn't take any weight getting to top of fish at 7666. 1.5 hrs. circulate and work over fish. Trip out of hole. Trip out of hole with 5-7/16" overshot and found a one ft. piece of tubing. Fouled up on hollow mill guide. Cleaned and serviced overshot. Rig service. Make up 5-7/16" ROSWO. 3 - 7- ( DATE 03/02/90 03/03/90 DESCRIPTION overshot, same as before, and trip in hole. Repair hose on the brake water pump. Finish tripping in hole to top of fish at 7666. Circulate and condition mud. work over fish. worked the lip guide down to 7675. Got some pump increase and a little drag. Trip out of hole, using pipe spinners, did not recover any Fish. the overshot showed that the fish had been inside and the pack-off had been pulled out. Dress the 4 11/16" with a 3 3/8" spiral grapple. 1/8" smaller than previous run. Trip in hole. same bottom hole assembly. Circulate bottom up and work over fish at 7666 ft. Worked fish at 50/65,000 with JARS. Fish pulled free or stripped out but pulled wet first standard. Stand back Kelly, blow Kelly and Lines. Fill trip ticket and trip out of hole. Pulled and layed down over-shot. No fish. Made up a 5 3/4: OD over-shot dressed with a 3 3/8" basket grapple, two extention subs. Total of (6.10 ft.) Bumper sub JARS, 6 - 4 3/4" D.C.'s. Pressure type drain sub, 24 D.C.'s. Trip in hole. Finish tripping in hole. Circulate bottoms up and work over fish. Had to set JARS off one time. then came free or slipped off fish again, but wt. indicater showed a small increase in up wt. 5/6000 lb. Pull out of hole. Break down fishing tools, recover 4.35' fish, make up 5-3/4" overshot with hollow mill Turn in hole to 7660'. Circulate bottoms up, wash over ~nd mill over top of fish to 7675'. work pipe. Attempt to pull fish free, pulled lOOm over and JAR on fish in an effort to recover fish, came free or slipped off, attempt to latch onto Fish again, could not. Pull out of hole, break out fishing tools, recover 2' fish. Service rig. Lay down overshot bottom hole assembly, make up 6" tapered swedge, bumper sub, oil jars, 6 DC accellerator jars. 24 each 4-3/4" DC. Trip in hole to 7628'. Cut and slip 100' of drilling line. Prepare to run 6' tapered swedge through tight spot. Circulate bottoms up at 7628'. Run 6" swedge in 7" 26# casing from 7642' to 7669'. Work tight spots. Fill trip tank and pull out of hole to 4210'. Secure rig operation, clear derrick of severe ice/snow that is falling on rig floor and poses a safety hazard to personnel. Pull out of hole, lay down swedge assembly. Attempt to pull wear ring, latching threads damaged, unable to pull conventionally, pickup 7" casing scraper and pull wear ring. Repair same. Rig up to test BOPE, test Hydril at 250/3500 psi. Test pipe/blind rams, unload Kelly cock, floor valves, standard pipe/swivel/kelly hose/choke and kill line. Unable to fly HOWCO pump operator for 5000 psi test pressure. Use rig pumps to reach 4500#, then hook up to waterflood triplex pump to obtain 5000#. Pick up washover bottom hole assembly: 5 7/8' shoe, 3 each 5 3/4" wash pipe, safety joint top sub, bump sub, (new) oil jars, ROSWO. 3 -8- DATE 03/04/90 03/05/90 03/06/90 DESCRIPTION 30 each 4 3/4" DC - 1040.155'. Trip in hole (slow) to 7618' Lay down 2 single joints for wash operation. Circuiate and condition fluid. Observe light spots that indicate some inflow, fluid properties indicate CAC03 may be settling out due to dillution and lower yield point (in hole). Observe 10.5# fluid at CBU. continue to condition fluid with washover assembly. Circulate and condition fluid with washpipe above fish at 7618'. Ream with wash pipe through tight section in 7" casing. From 7648' to top at 7668'. Wash over fish from 7668' to 7761'. Encountered significant hardspot at 7676'. Torque dropped and penetration increased past this point. Work washpipe over fish while circulating and condition fluid. Check well for flow. Chain out pull out of hole. Stand back washpipe bottom hole assembly. Make up TSA overshot assembly. Cut lip hollow mill, o/s bowl extention, top sub, bump sub, oil jar, 30 ea. 4.75" DC- 957'. Trip in hole with overshot assembly above fish at 7655'. Circulate to clear overshot. Work over fish. Pump pressure and string weight indicated fish was engaged. Pull out of hole (wet) with overshot and possible fish. Continue out of hole with fishing assembly at report time. Pull out of hole (wet) with overshot and fish. Recover 20.25' of tubing. Initial string weight and recovered fish indicate the fish may have parted at the wash pipe milled section while pull out of hole. Lay down fish and overshot assembly. Pick up wash pipe and cutter bottom hole assembly, cut lip guide. Cutter, top sub, 3 ea its. wash pipe, safety sub, top joint, bumper sub, oil jars = 112.67' Trip in hole. Break and inspect DC connection. Lay dow~ 2 each DC. Trip in hole slowly with wash pipe-cutter assembly. Mill wash pipe-cutter assembly. Over fish from 7698' to 7768'. Encounter torque and drag while working over fish. Attempt to cut tubing. Cutter assembly apparently damaged when milling over fish. Fill trip tank and circulate. Pull out of hole chain out. No fish recovered. Lay down cutter assembly. Pick up and trip in hole with overshot assembly: cut-lip guide, hollow mill, o/s bowl, extention. Top sub, drain sub, bump sub, oil JAR, 28 DC - 896'. Work over and engage fish, mill depth at 7697' - fish is not coming easily. Working fish to avoid premature failure of damaged mill section. Continue working fish at 7697' with overshot assembly. String weight fell off. Tag fish at 7701'. Could not re-engage fish. Suspect overshot barrel jammed or grapple failure. Fill trip tank, blow down Kelly and mud line. Pull out of hole chain out with overshot. Breakdown overshot assembly. No fish recovered. Grapple indicated ROSWO. 3 - 9- DATE 03/07/90 03/08/90 03/09/90 ( (' DESCRIPTION wear and poss. failure. Change mill shoe and grapple. Trip in hole with overshot assembly to 7590'. Slip and cut 100' of drill line. Washover and engage fish @ 7701'. Jar and work fish. Fish assembly came free. Fill trip tank, blow down Kelly. Pull out of hole chain out. Lay down overshot. Recover 7.70' of fish. Fish parted at overshot hollow mill. Just inside guide. Tubing. Indicated clean break. Pick up washover assembly. Mill shoe, 4 each wash pipe (12g'), safety joint, bump sub, oil JARS, 28 DC: 1009'. Trip in hole with washover bottom hole assembly at report time. Continue tripping in hole with washover assembly slow. Engage top of fish at 7695'. Mill and washover FISH from 7695' to 781g'. Observe tight spots with erratic torque which could be tubing collars. Fill trip tank, blow down Kelly and check for flow. Pull out of hole with overshot assembly. Lay down 1 each DC with flared box connections. Mill shoe came out with axial cracks and several sections left in hole. Left in hole are 2 each 10" x 4.75" x 0.5" pieces of mill shoe with carbide facing on crown end. 2-3". Cracks indicate little subsequent wear, suspect pieces left in hole at end of washover run. Make up outside cutter bottom hole asembly: cut lip mill, cutter, tob sub, 4 each washpipe sections, safety joint, bump sub, oil jars, 6 each 4.74" DC:328.77. Trip in hole (wet) slowly to top. Workover TOF at 7695' to 7807' Pick up string and activate cutter assembly on tubing ~ollar at 7796'. Rotate to engage cutters and sever pipe. Repeat process to assure cut. Pull out of hole with washpipe cutter assembly. Recover and lay down 102.66' of fish and cutter assembly. Service rig. Make up drag mill shoe on washpipe assembly. Trip in hole (wet) to top at 7800'. Mill and washover fish and mill junk from 7818' to 7829'. Mill junk stacked on tubing collar at 7828' {annular) and slowed milling progress. Fill trip tank, blow down Kelly. Pull out of hole chain out. Bottom 1' of drag mill shoe milled down or left in hole. Lay down drag mill shoe and bumper sub. Pick up flat mill and bump sub. Trip in Hole {wet) and washover fish to 7826'. Mill on junk in annulus. Washover top of fish at 7800' to 7826'. No appreciable progress. Fill trip tank, blow down kelly and mud line, pull out of hole chain out. lay down flatmill shoe. Mill condition was worn down with no body loss in hole. Pick up scalloped mill shoe bottom hole assembly: Washpipe, safety sub. Float sub, bumper sub, oil jars, 28 DC-- 1010'. Fill pipe at 4263'. Trip in hole to 7800'. Washover fish. Mill at 7826' No appreciable progress. Fill trip tank, blow down Keliy and mud line. Adjust brakes. Pull out of hole chain out. Lay down scalloped ROSWO. 3 - 1 O- DATE 03/10/90 03/11/90 DESCRIPTION mill shoe. Observe arched cracks in two locations on shoe. No material lost in hole. Pick up overshot bottom hole assembly scallop shoe guide, overshot bowl with 3-3/8" grapple. 2 each top extention, top sub, drain sub, bumper sub, oil jar. 6 each 4 3/4" DC = 211.72'. Trip in hole to 7790'. Slip and cut 100' of drill line. Wash over and engage fish at 7800'. Fish came free at 75000# over. Estimate TOF at tubing collar, 7826'. Circulate/condition fluid. Circulate and cindition well fluid. Fill trip tank, Blow down Kelly/mud line. Pull out of hole chain out. Lay down overshot and recovered Fish at 16.70' of 3.5" tubing Also 1 spiral piece of 7" casing at 6" long was recovered from top of overshot extention barrel xo sub. Make up concave plated mill and 2 junk baskets. Bit sub with float. Trip in hole with 3.5 DP. Pull out of hole and lay down mill assembly. Break down fishing tools and lay down wash pipe. Run in hole with dc's. Pull out of hole. Lay down same. Rig down wireline. Trip in hole with 3.5" DP open ended. Tag top of fish at 7818' DP depth. Rig up HOWCO and prime lines. Circulate well fluid bottoms up @7810'. Prepare to pump cement plug. Pressure test HOWCO line to 3000#. Pump 5 bbl freshwater ahead, 10 bbl filtered inlet water with 82 sx "G" cement. 0.20% CFR-3, 0.5% LWL @ 15.8# slurry weight. Displace with 52 bbls 14.8 # well fluid for balanced plug. Maximum pump pressure at 2200#. CIP at 2340 hrs. Pull out of hole I single + 7 standards to 7172' Circulate and monitor mud. shut in and hold 300# on piug. Wait on cement. Rebuild mud mix pump, repair and replace valves in mud pits, replace kelly spinner motor, service rig. Rig up to transfer 14# fluid from A44-11 to Al1-13. Waiting on cement and rigging up lines. Continue waiting on cement. Back pressure bled off on annulus. Make up lines to displace well fluid fromA44-11 to A11-13RD. Run in hole to tag TOC. Did not find TOC at 7400' +/-. Run in hole and locate top of cement at 7602', set down on cement with 10,000# of weight. Pick up and circulate hole at 7580'. Rig up HOWCO lines and pressure test to 3000#. Pump 10 bbl fresh water ahead, 6.61 bbl water with 56 sacks of "G" cement with .25% CFR-3 at 1.10 cf/SK yield. Slurry wt at 15.8#. Follow with 2.8 bbl spacer, displace with 50 bbls for a balanced plug. Pull out of hole 6 standards to 7040' and reverse circulate 60 bbls. CIP at 1800 hrs. 3/10/90. Wait on cement circulate and condition workover fluid, shut in well and hold 300# on annulus. Change oil in rotary table and swivel. Service rig. Rebuild mud mixing pump. Pressure held at 300#. Bleed off same. Run in hole and tag top of cement at 7426'. Pull out of hole to 5487' and circulate. Rig up HOWCO lines and pressure test to 3000#. Pump 10 ROSWO. 3 - 11- DATE 03/12/90 03/13/90 DESCRIPTION bbls fresh water ahead, 9 bbls water with 75 sacks of "G" cement with .25% CFR-3 at 1.19 cf/sack, 15.8#/gal. 2.8 bbls water, displace with 37.4 barrels of 14.8 # workover fluid. CIP at 0500 hrs. Calculate 400' plug length from 5100' to 5500'. Reverse circulate and prepare to transfer workover fluid to Al1-13. Pull out of hole to 4742' and reverse circulate workover fluid. Rig up HOWCO to displace 14.4# workover fluid with filtered inlet water and VISCO 3900 inhibitor. HOWCO displaced 14.4# fluid to mud pits, then circulated filtered inlet water to clean up well and pickle with visco 3900 inhibitor. Pressure test casing and TOF plug @5100' to surface at 1500# with 8.6# filtered inlet water in hole for 30 minutes. Test good with no pressure drop. Pull out of hole with 3.5" DP. Top off hole with filtered inlet water and inhibitor. Nipple down BOPE and prepare rig for move. Pulling drilling riser from "F" spool. Nipple down BOPE, pull flow nipple, hydril, double gate ram assembly, mud cross and drilling riser. Make up wellhead and valves on tree. pressure test to 1500#. Good. Secure wellhead, release to production. Rig released @ 0600 hrs. ROSWO. 3 - 12- ! - .. RE RET..AIN THIS SECTION FOR YOUR RECORDg (- ~ A44-11 (SHELL gOGS) { VERTILOG 1 ~RAY I PRINTS 0 NEG..-- ~PRINTS 0 NEG .~ PRINTS NEG. ,,PRINTS.~NEG. ~PRINTS~NEG.~ 1 SEPIA 1 SEPIA SEPIA SEPIA SEPIA MAR '" ~- ~aan PRINTS ~ ,_-PRINTS Alaska 0il & Gas Cons. C0~'~t~[I~PRINTS ABOVE RECEIVED'FI~M~'~T?L~S WlRELINE ATTENTION JO~ SIGNED ~~ DATE NEG. NEG. NEG. SEPIA SEPIA SEPIA 19 , Shell Western E&P Inc. O 601 West F~fth Avenue · Suite 800 Anchorage, Alaska 99501 March 12, 1990 State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Gentlemen' SUBJECT' APPLICATION FOR SUNDRY APPROVAL FOR UPCOMING WORKOVER ON MIDDLE GROUND SHOAL (MGS) WELL A44-11 Enclosed are three copies of the Application for Sundry Approval for the upcoming workover on MGS well A 44-11. The workover will include plugging and t~-e~-y abandonment~ This operation will commence on March 9, 1990. Verbal approval to commence operations was given by Mr. Lonnie Smith to Mr. P.T. Huckabee on March 9, 1990. If you have any questions concerning this application, please contact Susan Brown-Maunder at (907) 263-9613.-~ ~ .... ~,~ Very truly yours, W. F. Simpson Manager, Regulatory Affairs Alaska Division WFS/SBBM/raf Enclosures RECEIVED Alaska 0il & Gas Cons. Commission Anchora~ SBBL/asa.012590 Dc' C. M. Kidwell, WCK 1178 B. N. Osborn, Kenai P. T. Huckabee SEA File Correspondence File 5.91 Production File Reading Files RECEIVED Gas Cons, Commlssior~ Anchoragra SBBL/asa. O12590 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1 Type of Request Abandon ~J~ Suspend _~ l~C~Operat,on shutdown __ Re-enter suspended well __ Alter cas~ng~ Repair ~re-~'__ pluggIng ~. Time extens,on __ Stimulate __ Change approved program __ Pull tubing ~ Vanance __ Perforate __ Other __ 2 Name of Operator Shell Western E&P Inc. 5 Type of Well Development __ Exploratory __ Strat~graph~c __ Serwce _,y,_ 3 Address 601 West Fifth Avenue, Suite 810 Anchorage, AK 99501 6 Datum elevation (DF or KB) 116' DF feet Unit or Property name Middle Ground Shoal Well number A44-11 4 Locatlon of well at surface Platform "A", Leg 4, Conductor 16. 55.7'N & 57.42'E from center of Leg 1 (~ 1627'N & 435'W. from S.E. Corner of Sec.ll, T8N, R13W S.M. At top of producbve ~nterval 1002'S & 179'W of surface location At effective depth 9 Permit number 67 -35 10 APl number 50-- 733-20027-00 11 Field/Pool "G" Pool At total depth 1384'S & 431'W of surface location 12. Present well cond~bon summary Total depth measured 9,260 ' true verbcal Effectlvedepth measured 9,151 ' true verbcal Casing Length Structural Conductor Sudace Intermediate 1912 ' 10-3/4", 40.5# J-55 Production Liner 9211 ' Perforation depth measured 7666'-9137' 10 intervals true vertical 7423 ' -8811 ' feet Plugs (measured) feet feet Junk (measured) feet S~ze Cemented 7,816' Measured depth 2200sx 1912' 7" 26-29# N-80 2350sx 9211' Tubing (s~ze, grade, and measured depth) 3-1/2" from 7,816' - 8,615' Packers and SSSV (type and measured depth) Packers set ~ 7598', 8369', 8506', 8579' True vertical depth RECEIVED JV AR ! 2 ]9 n A~aska 0ii & Gas Cons. C0mmJssJ0n Anch0raFa 13 Attachments Descripbon summary of proposal .Z.. Detaded operabons program __ BOP sketch __ 14 Esbmated date for commenang operation I March 9, 1990 16 If proposal was verbally approved Od __ Gas __ Lonnie Smith 3/9/90 Date approved Serwce injector Name of approv.~ 1_7. I hereby cerbfy ~,~ the foregoing ~s true and correct to the best of my knowledge /~lg~n d i~~~~~'"~"~_...., Title Divisions 0perations Manager - -"' FOR COMMISSION USE ONLY 15. Status of well classification as Suspended__ Date Conditions of approval. Nobfy Commission so representabve may witness Plug ~ntegnty __ BOP Test __ Location clearance m Mechamcal IntegntyTest__ Subsequent form required 10- ~ IApproval No ~.... Approved by order of the Commission Form 10-403 Rev 06/15/88 SBBL/a sa o 031290 ORIGINAL SIGNED BY LONNIE C. ~'~l~ved Copy · 'Returnec~ Comm,ss, oner Date ~ --' 1 3 -'q 0 SUBMIT IN TRIPLICATE,~ ~ MIDDLE GROUND SHOAL WELL No. A44-11 PRESENT STATUS: Attempts to fish tubing and packers has been unsuccessful. The probability of successfully returning this well to injection is too low to justify further fishing operations. The top of the fish is at 7816'. The AOGCC has given verbal approval (via Lonnie Smith - 3/09/90) to abandon wellborevwith a cement plug from the top of the fish to 7400'. ~,~-940,~ ' OBJECTIVES: 1) Set balanced cement plug from the top of the fish to ?400'. 2) Set balanced cement plug from 5500w to 5100w. 3) Recover CaCO3 workover fluid, via circulation with Filtered Injection Water (FIW), for use in A11-13RD2 workover. 4) Test casing and cement plug to 1800 psi. 5) Pickle well with corrosion inhibited (NALCO-Visco 3900), de-oxygenated, FIW. 6) Secure well at surface· ?) Skid rig to A11-13RD2. PERTINENT DATA: See Attachment No. I for "Present" Mechanical Configuration. PROPOSED OPERATIONS: 1. RIH "open ended" with 3-1/2" 13.3# workstrtng. Tag top of fish (@ '7816'). PU off of fish and establish circulation. 2. RU Halliburton cementing equipment. . Mix and pump 82 sx Class "G" cement in 5.0 gal/sack water (15.8 ppg, 1.15 cu-ft/sk yield) with 0.25 ~ CFR-3 (2.5 hfs thickening time) to spot a balanced plug from '7810' to 7370'. 4. POO cement to '7200'. Reverse a minimum of 60 bbls CaCO3 mud to remove any cement from workstring. · Wait on cement a minimum of 8 hours· Tag TOC to locate and check hardness. If TOC is below 7540', spot additional cement as required to leave TOC at 7370'. If TOC is above 7540', but not hard, PU and wait 4 more hours. 6. Tag TOC. If hard, PU to 5500'. 7. Mix and pump 75 sx Class "G" cement in 5.0 gal/sack water (15.8 ppg, 1.15 cu-ft/sk yield) with 0.25 ~ CFR-3 (2.5 hfs thickening 'DDLE GROUND SHOAL No. A4( .__1 · · 10. 11. 12. time) to spot a balanced plug from '5500' to 5100'. Wait on cement a minimum of 8 hours· Tag TOC to locate and ensure set. If hard, recover CaC03 mud by circulating hole clean with Filtered Injection Water (FIW). If necessary to discharge any mud, refer to Attachment No. 2 for "Workover Fluid Discharge Limitations". Ensure well is static. Pressure test casing and cement plug to 1500 psi. If pressure drops more than 10 percent within 30 minutes, contact engineering for corrective measures. Circulate hole clean with corrosion inhibited (NALCO-Visco 3900), de-oxygenated, FIW to "pickle" wellbore. Refer to Attachment No. 3 for "Procedures for Handling Backflowed and Circulated Fluids". POOH filling well with inhibited FIW. ND BOP's. NU tree· Test tree and wellbore to 1500 psi. Install pressure gauges at wellhead to monitor ?" casing and ?" x 10-3/4" annulus pressures· Skid rig to A11-13RD2. Recommended: w~or~kp~_9646 home ph # 243-4271 Concurred : Approved: Date: cc: ANCHORAGE Division Operations Manager - M. L. Woodson Division Drilling Engineer - V. E. Unger Kenai Production Office - B. N. Osborn Platform "A" Drilling Foreman - C. V. Willoughby/L. K. Hillegelst Platform "A" Operations Foreman - R. V. Hill/J. W. Tracy Environmental Technician - S. S. Brown-Maunder Anchorage Engineering File Room - Category (6) HOUSTON WOODCREEK C. M. Kidwell - WCK 1178 R. G. Lippincott - WCK 1140 S. M. Logan - WCK 1162 E. W. Kitchen - WCK 1136 RECc!VEt; ORIGINAL TO: Woodcreek File Room - WCK 4100 ,, ,,,,<,:: .~ & Gas ¢ons~ Commissior~ Anohom~ page 2 77"~' ( APPLICATION FOR SUNDRY APPROVALS DESCRIPTION SUMMARY OF PROPOSAL MIDDLE GROUND SHOAL WELL No. A44-11 The Middle Ground Shoal in3ectlon~ no. A44-11 is being ....... c~. because of unrecoverable junk in the hole at 7816' Mb (above the target in3ectlon intervals from 8399' to 9137' MD). Attempts recover the 3unk have failed and resulted in an expenditure of over $900,000 to date. The low probability of returning this well to in~ection did not 3ustify further attempts to recover the 3unk. The wellbore is being considered for future application as a service well and/or the for slot recovery/redrill. Open perforations were present above the junk from 7666' to 7701' and below the junk from 8076' to 8125'. Casing damage is suspected at 7645'. A 14.8 ppg calcium carbonate mud was in the hole. A cement squeeze below a retainer [20 AAC 25.105 (h) (1) (B)] was not felt to be appropriate because of the properties of the mud. Following verbal approval received via conversation with AOGCC commissioner Lonnie Smith on March P, 1990,. a 500'+ cement Dlu~was Dlaced by the displacement method from the tod of the Junk ('7810') to '7302' in compliance with [20 AAC 25.105 (h) (1) (A)]. Sign/f/cant casing corrosion was indicated from 5600' to 6600' via a Western-Atlas VERTILOG run 2/24/90. The following additional operations were performed to ensure and maintain mechanical integrity of the wellbore. 1) A 400' cement plug was placed by the displacement method from ~5500' to ~5100' to isolate the questionable casing. 2) 14.8 ppg mud was left in the wellbore between the cement plugs. 3) Corrosion inhibited, 8.6 ppg water was left in the wellbore above the top cement plug to "pickle" the wellbore. 4) The casing and top cement plug was tested to 1500 psi [20 AAC 25.410 (c)] to ensure mechanical integrity of the wellbore. 5) Additionally, pressure gauges will be installed to monitor the 7" and ?" x 10-3/4" annulus pressures to ensure mechanical integrity is maintained following rig operations. -_ --( d 771~ I ' - / / January 26, 1990 Shell Westem E&P Inc. O 601 West F;fth Avenue · Suite 810 Anchorage, Alaska 99501 State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Gentlemen: SUBJECT: APPLICATION FOR SUNDRY APPROVAL FOR UPCOMING WORKOVER ON MIDDLE GROUND SHOAL (MGS) WELL A44-11 Enclosed are three copies of the Application for Sundry Approval for the upcoming workover on MGS well A 44-11. The workover will include pulling tubing as well as stimulation. These operations are expected to commence around February 8, 1990. If you have any questions concerning this application, please contact Susan Brown-Maunder at (907) 263-9613. Very truly yours, W. F. Simpson Manager, Regulatory Affairs Alaska Division WFS/SBBM/raf Enclosures RECEIVED JAN 3 o 1o~90 Alaska Oil & Gas Cons. Commissio[~ Anchora~a SBBL/asa.012590 f STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 0 APPLICATION FOR SUNDRY APPROVALS 1 Type of Request Abandon __ Suspend I Alter casing __ Repair well Change approved program I Operation shutdown __ Re-enter suspended well __ Plugging __ Time extension Pull tubing L Vanance / Pedorate __ Other 2 Name of Operator Shell Western E&P Inc. 3 Address 601 West Fifth Avenue, Suite 810 Anchorage, AK 99501 5 Type of Well Development / Exploratory __ Strabgraph~c I Serwce --X- 4 Locabon of well at surface Platform "A", Leg 4, Conductor 16. 55.7'N & 57.42'E from center of Leg 1 ~ 1627'N & 435'W. 6 Datum elevabon (DF or KB) 116' DF 7 Unit or Property name Middle Ground Shoal 8 Well number A44-11 feet from S.E. Corner of Sec.ll, T8N, R13W S.M. At top of producbve ~nterval 1002'S & 179'W of surface location At effecbve depth At total depth 1384'S & 431'W of surface location 9 Perm~tnumber 67-35 10 APInumber 50-- 733-20027-00 11 Field/Pool "G" Pool 12 Present well cond~bon summary Total depth measured 10,555 true vertical feet feet Effective depth measured 10,432' true vertical feet feet Size Casing Length Structural Conductor Surface Intermediate1912 ' 10-3/4", 40.5# J-55 Production Liner 9211 ' 7" 26-29# N-80 Perforation depth measured 7666' -9137 ' 10 intervals true verbcal 7423 ' -8811 ' Tubing (s~ze, grade, and measured depth) 3-1/2"set @ 7612' Packers and SSSV (type and measured depth) Packers set ~ 7598', 8369', 8506', 8579' Plugs (measured) Junk (measured) Cemented 2200sx 2350sx Measured depth True vertical depth 1912' 9211' RECEIVED JAN 3 0 1990 Alaska 0ii & Gas Cons. C0mmissi0[~ ~ch0raFa 13 Attachments Descnpt~on summary of proposal .Z.., Detaded operabons program __ BOP sketch __ 14 Estimated date for commencing operation February 8, 1990 16 If proposal was verbally approved Od I Gas ~ Name of approver/q Date approved Serwce injector 17. I hereby certify thc the foregoing ~s t~le and correct to the best of my knowledge. Signed ~[/C'..b,~ ~~ ~,,"~'J~/"-.-_ to ' 's'o s Operations Manager · - "--'"' '"' ' " - FOR COMMISSION USE ONLY 15. Status of well classification as. Suspended__ Cond~bons of approval Nobfy Commission so representabve may witness Plug ~ntegrity __ BOP Test / Location clearance __ Mechamcal Integnty Test ~ Subsequent form required 10- #,~, Approved by order of the Commission Original Signed By David W. Johnston JApproval No ¢~_ Form 10-403 Rev 06/15/88 SBBL/a sa. 012590 SUBMIT IN TRIPLICATE ~. APPLICATION FOR SUNDRY APPROVALS DESCRIPTION SUMMARY OF PROPOSAL MIDDLE GROUND SHOAL WELL No. A44-11 The Middle Ground Shoal well no. A44-11 is currently shut in because of mechanical integrity failure of the wellhead and between the tubing and casing. The following operations are recommended to correct the mechanical integrity problems. Selective stimulation/isolation of the perforation intervals will also be performed during the workover. A copy of the current mechanical configuration of the wellbore is attached. An illustration of the modified mechanical configuration will be submitted with the Report of Sundry Well Operations. 1. Kill well via Coiled Tubing Unit. 2. RU workover rig. 3. Pull tubing and send for inspection. 4. RIH with test packer to 7350' (TVD) and pressure test casing to 1850 psi. 5. Remove downhole packer (zonal isolation) assembly. 6. Clean out wellbore to PBTD. ?. Selectively stimulate target injection intervals. 8. Isolate non-target perforation intervals. 9. Rerun injection equipment (with replacement tubing). 10. Pressure test tubing/casing annulus to 1850 psi. 11. Replace wellhead, from seal flange up, with 4t0 stainless steel tree. 12. Return to injection into the target injectlon intervals. RECEIVED Anchor~a 2 3 4 5 6 7 8 9 10 11 COMPLETION EQUIPMENT DETAIL SHEET MGS A44-11 7/13/87 NO. ITEM APPROXIMATE TVD. hiD. PSI OR 1. OTIS BALL VALVE 2. OTIS "XO" SLIDING SLEEVE 3. GUIBERSON UNI-PACKER VII 4. CAMCO KBM MANDREL #1 5. GUIBERSON UNI-PACKER VII 6. CAMCO KBM MANDREL #2 7. OTIS "XO" SLIDING SLEEVE 8. GUIBERSON UNI-PACKER VII 9. CAMCO KBM MANDREL #3 10. OTIS "XO" SLIDING SLEEVE 11. GUIBERSON UNI-PACKER VII 274 274 7331 7561 7364 7598 8037 8333 DUMMY 8072 8369 8161 8466 DUMMY 8166 8472 8198 8506 8230 8539 OR 1/8 8265 8575 8269 8579 CASING 10 3/4", 40.5#, J-55 @ 1912' w/2200 sx 7" 26#, N-80 BUTTRESS @ 0-8331' 29#, N-80 BUTTRESS @ 8331-9211' w/1600 sx SQUEEZED @ 7950' w/150 sx SQUEEZED @ 7980' w/600 sx PBTD = 9151' TD = 9260' TUBING' 3 1/2", 9.3#, N-80 EUE @ 0-274' 9.3#, J-55 EUE @ 274-8615' PERFORATED ZONE GROSS INTERVAL GN-GO GR-GS GR-GS HC-HD HC-HD HE-HF HI-HK HK-HN HN-HR HR-HZ 7666-7701 8076-8088 8101-8123 8399-8449 8467-8504 8519-8554 8625-8656 8669-8820 8832-8986 8986-9137 RECEIVED jarl 3 0 1,%,'3 Shell Westem E&P Inc. 601 West Fifth Avenue · Suite 810 Anchorage, Alaska 99501 January 17, 1990 Alaska Oil and Gas Conservation Commi ss ion 3001 Porcupine Drive Anchorage, AK 99501 Gentlemen: SUBJECT: CANCELLATION OF OUTSTANDING REPORT OF SUNDRY WELL OPERATIONS FOR MGS WELL NOS. A33-14, A12-12, A23-OIRD, A34-11, A34-14RDII, A44-11, A13-12RD AND C31-26 Enclosed are two copies of the Report of Sundry Well Operations for MGS well nos. A33-14, A12-12, A23-OIRD, A34-11, A34-14RD II, A44-11, A13-12RD and C31-26. These workovers were all cancelled and none of the work was performed. If you have any questions concerning these reports, please contact Susan Brown-Maunder at (907) 263-9613. Very truly yours, W. F. Simpson Manager, Regulatory Affairs Alaska Division WFS/raf Enclosures SBBL/aogcc. 011790 STATE OF ALASKA MI~ ALASKA OIL AND GAS CONSERVATION COM REPORT OF SUNDRY WELL OPERATI S 1 Operations pedormed Operation shutdown __ Stimulate __ Plugging Pull tubing ~ Alter casing ~ Repair well Pedorate ~ Other L CANCELLED I 2 Name of Operator 5 Type of Well She11 Western E&P I nc. Development__ Exploratory __ 3 Address 601 West Fifth Avenue, Suite 810 Strat]graph~c Serwce Z ,Anchorage_. AK 99C, nl 4 Locat~on of well at surface Platform "A" Leg 4 Conductor 16 8 , , 55.7N & 57.42'E from center of Leg 1 ~ 1627'N & 435'W. At top of prod~=cr{R~ ~Rt, e~,aForner of Sec. 11, TeN, R13W $.H. 9 6 Datum elevabon (DF or KB) 116' KB 7 Umt or Property name Niddle Ground Shoal Well number t~hh.1 1 PermIt number/approval number feet 1002'S & 179'W of surface location At effecbve depth At total depth I~RA' .~ · ~,tl ~ W ~ ~,,.~-~ 12 Present well condition summary Total depth measured 10,555 true vertical feet feet 67-35 / 9-688 10 APl number 50-- 733-20027-0{3 11 Reid/Pool "G" Pool Plugs (measured) Effective depth measured 10,432' true vertical feet feet Junk (measured) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth. Length S~ze 1912' 9211 ' measured 7666' -9137 ' 10 Intervals true vertical Tubing (size, grade, and measured depth) Cemented 10-3/4", 40.5# J'55 2200sx 1912' 7" 26-29# N-80 2350 sx 9211' 3-1/2"set ~ 7612' Measured depth True vertical depth Packers and SSSV (type and measured depth) Packers set @ 7598', 8369', 8506', 8579' 13. Stimulation or cement squeeze summary Intervals treated (measu red) N/A Treatment descnpt~on including volumes used and final pressure 14. Representabve Daily Average Production or Injection Data Od-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Pnor to well operation Subsequent to operation 15 Attachments Cop~es of Logs and Surveys run ~ Dady Report of Well Operations ! 16 Status of well classification as: Od __ Gas __ Suspended __ Serwce INJECTOR 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~~ P~, j~j Title DIVIS ION OPERATIONS NGR. Form 10-404 Rev 06/15188 SBBL/r swo .011590A4411/1 Date 01/17/90 SUBMIT IN DUPLICATE Shell Westem Inc. 601 West Fifth Avenue · Suib Alaska 99501 Anchorage, August 8, 1989 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 SUBJECT: TRANSMITTAL OF APPLICATIONS FOR SUNDRY' APPROVAL FOR MIDDLE GROUND SHOAL WELLS A12-12, A23-OIRD, A33-14, A34-11, A34-14RDII, AND A44-11. Enclosed, in triplicate, are six Applications for Sundry Approval for Middle Ground Shoal wells. The workovers involve stimulating the wells with 15% HC1. The work is scheduled to begin as soon as approval is received from your office. If you have any questions regarding this matter, please contact Susan Brown-Maunder at (907) 263-9613. Very truly yours, ~,'1o: N. F. Simpson Manager, Regulatory Affairs Alaska Division MLW/SBBM/dl · Enclosures RE£E VED Oil & Gas Cons. Commission Anchorage SBBJ/aogcc. 080889 SBBJ/a sa. 073189c .... v,,, ,,~ , ,q,r-,~m: APPLICATION FOR SUNDRY APPROVALS 1 Type of Request Abandon __ Suspend __ Operation shutdown __ Re-enter suspended well __ Alter casing __ Repair well __ Pluggmg __ Time extension __ Stimulate ~ Change approved program __ Pull tubing __ Vanance __ Perforate __ Other __ 2 Name of Operator 5. Type of Well 6 Datum elevation (DF or KB) She11 Western E&P I nc. Development __ 116' DF feet Exploratory __ 3 Address 601 West: Fifth Avenue, Suite 810 Strat~graph~c__ 7 Un~t or Property name Anchorage, AK 99501 Serwce-x-- Hiddle Ground Shoal 4 Locat~on of well at surface Platform 'A', Leg 4, Conductor 16. 8 Wellnumber 55.7'N & 57.42'E from center of Leg 1 @ 1627'N & 435'W. from S.E. Corner of Sec.11, T8N, R13W S.M. A44-11 At top of productive ~nterval 9 Permit number 1002'S & 179'W of surface location 67-35 At effective depth 10 APl number 50-- 733-20027-00 At total depth 11 Reid/Pool 1384'S & 431'W of surface location "G" Pool 12 Present well cond~bon summary Total depth measured 10,555 ' feet Plugs (measured) true verbcal feet Effective depth measured 10,432 ' feet Junk (measured) true verbcal feet Casing Length S~ze Cemented Measured depth True verbcal depth Structural Conductor Sudace Intermediate1912 ' 10-3/4", 40.5# J-55 2200sx 1912 ' Production Liner 9211 ' 7" 26-29# N-80 2350sx 9211 ' Perforation depth measuredl0 intervals7666"9137' ~C~ /~0 true vertical 7423 ' -8811 ' Tubing (s~ze, grade, and measured depth) 3-1/2"set ~ 7612' ~Sk~l Oil & G~S ~Otl?,, r~,~Otlltll[$S~Ot~ Packers and SSSV (type and measured depth) j~ftc~Of~e Packers set: ~ 7598', 8369', 8506', 8579' 13. Attachments Descnption summary of proposal Z._ Detaded operabons program __ BOP sketch __ 14 Esbmated date for commencing operation 15 Status of well classification as As soon as approval is received. 16 If proposal was verbally approved O~1 __ Gas __ Suspended __ Name of approver Date approved Serwcei n.jector 17. I hereby certify I~t the foregoing ~s true and correct to the best of my knowledge S,gned ~[~(/',.t// 0J'~ ~t)~. T, tleDivisions Operations Manager Date ~. ~.~ · ' ' '~ -- FOR COMMISSION USE ONLY Condlt,ons of approval. Not,fy Commission so representat,ve may w,tness ! Approval No..,~ ~,~;)~ Plug ~ntegnty __ BOP Test __ Locabon clearance I -- Mechan~callntegrltyTest__ Subsequent form required 10- ~O~ Approved CoPY - Beturneci Original Signed By ~ Approved by order of the Comm,ss, on ~t~ W. Johnston Commissioner Date ~/i~., ~ F Form 10-403 Rev 06/15/88 SBBJ/073289b SUBMIT IN TRIPLICATE PROGNOSIS MGS A 44-11 OPERATION: Pump acid into water injection well. OBJECTIVE: Increase water injection rate from 700 to 840 BWPD. COMPLETION EQUIPMENT: See attached completion equipment detail dated July 13, 1987. STATUS: The current water injection rate is about 700 BWPD. On January 1, 1989, water injection rate was about 840 BWPD. ACID REQUIREMENTS: 1,000 gallons of 15%HC1 w/Inhibitor. PROCEDURE: 1. Rig up D.S. pumping equipment and test all lines and equipment to 5,000 psi using filtered injection water. Test acid for strength by titration method, to be witnessed by SWEPI representative. 2. Pump 1,000 gallons of 15% HCl with inhibitor into well followed by filtered injection water. Place well back on injection. Surface pressure on well will be 3,500 psi while on injection. RD D.S. 3. Note any change in injection rate on Morning Report. RECOMMENDED: DATE: JUL 2 5 1989 APPROVED: ,~.,/',/. ~_~ .-~,..~Y"t.-,l.~ DATE. HAVS/072589 May 5, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Shell Western E&P Inc. 801 West Fifth Avenue- Suite 810, ~'~/-,? Anch°rage' Alaska 9'~,'/''~'~' J.~.~..'_~l~"'"'~: / I- l STAT TECH I--~ Gentlemen: SUBJECT: AREA INJECTION ORDER NO. 9 (CENTRAL PORTION MIDDLE GROUND SHOAL FIELD), RULE 6 As part of the requirements of Area Injection Order (AID) No. 9, Rule 6, a schedule for performing radioactive tracer surveys (RTS) must be submitted to and approved by the commission. During conversations with members of your staff it was indicated that the Commission may accept recent RTS's even though the commission representatives did not have the opportunity to witness the surveys. By way of this letter, SWEPI is submitting our schedule for performing RTS's on injection wells and request that you accept the recent surveys as satisfying the requirements of Rule 6 based on the enclosed RTS logs. (See Attachment I for list of enclosed logs.) Attachment 2 is a table showing the mechanical integrity history for the MGS injection wells. Also shown is the proposed testing schedule noting those wells for which we are asking .your acceptance of the previously run surveys. Your early review of this proposal would be greatly appreciated. If we can be of further assistance, please do not hesitate to call Ms. Susan Brown-Maunder at (907) 263-9613. Very truly yours, I~, W. F. Simpson Manager Regulatory Affairs SBBM/hr Enclosures GTK1/050489 Attachment 1 LIST OF ENCLOSED LOGS Well No. ,~ ,A11-12 L, Al1-13 RD II ~ A12-12 ~ A33-14 ,~' A34-14 RD I I · / A44-11 ' C23-26 ~ C24-23 ~ C34-23 V ~ C41-23 Log(s) RAF- 6/17/87 NFL- 1/17/86 NTL- 3/4/88 NFL- 3/5/88 RAT - 6/17/87 NFL- 9/5/86 RTS- 3/26/88 o. NFL- 1/26/87 NFL- 2/12/87 NFL- 1/27/87 NFL- 2/10/87 NFL - 2/12/87 NFL- 10/24/87 GTK1/050489 REPORT OF SUNDRY WELL OPERATIONS Feetl¢~ I Operations performed: Operahon shutdown [] Stimulate []X Plugging [] Alter Casing [] Other [] 2 Name of Operator Shell Western E&P Inc. 3. Address 601 West Fifth Ave., Suite 810, Anchorage, AK 99501 4 Locahon of well at surface Platform "A" Leg 2 Conductor 16 55.7'N & 57.42'E from center of Leg I @ 1627'N & 435'W. At top of productive ~nterval from SE corner of Sec. 11, T8N, R13' S M .002'S & ' ~k~ 6~f,ec[ive ~eptti~ 179 W of surface location At total depth 1384'S & 431"W of surface location 11 Present well condition summary Total depth, measured true verhcal 9260' feet Plugs (measured) 8934' feet Perforate [] Pull tubing [] 5. Datum elevahon (DF or KB) 116' DF 6. Umt or Property name Middle Ground Shoal 7. Well number ~ 44.-11 8. Approval number 7-422 9 APl number 50-- 733-20027-00 10. Pool "G" Pool Effective depth measured true verhcal 9151' feet Junk (measured) 8828' feet Casing Length Structural Conductor Surface 1912' Intermediate Production 9211 ' L~ner Perforation depth measured true verhcal Size Cemented 10-3/4" 40 5# J 55 , · , -- 7" 26-29# N-80 7666'-9137' 7423'-8811' Tubing (s,ze, grade and measured depth) 3-1/2" set @ 7612' Packers and SSSV (type and measured depth) Packers set @ 7580' 8219' Measured depth True Vertical depth 2200sx 2350sx (10 INTERVALS) 1912' 9211' RECEIVE]) 0il & Gas Cons. C0mmissi~ 12. Stimulahon or cement squeeze summary Coiled tubing acidized w/900 gal. 15% HCl + 1000 gal 12%/3% H6I/HF Max. pressure 3600 psi Intervals treated (measured) 8669-9137' , Treatment descriphon including volumes used and hnal pressure 13 Prior to well operahon Subsequent to operahon Representahve Da~ly Average Produchon or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 776 3500 ps i 1155 3500 psi 14 Attachments Da~ly Report of Well Operahons ~S Cop~es of Logs and Surveys Run [] 15 I hereby cerhfy that the foregoing ~s true and correct to the best of my knowledge Signed .~~ Form 10-404 Rev 12-1-85 0708a/SBBF Production Superintendent T~tle Date~?'/~' ~¢'7 Submit ~n Duplicate DAILY JOB SUMMARY WELL NO.' A44-11 DATE: 06/30/87 OPERATION' ACID TREATMENT Rigged up. RIH w/1-1/4" coil tubing w/2.20" bullnose. Pumped filtered water at 3/4 BPM and 2800 psi. Tagged fill @ 9057'. Increase rate to I BPM and 3000 psi. Pumped 2 bbls of 15% HC1, wash down to 9066'. Pumped 6 bbls of 15% HC1, 1000 gal 12% HC1/3% HF and followed with 15% HC1. Returned well to injection. 0708c/SBBF June 25, 1987 Shell Westem E&P Inc. 601 West Fifth Avenue · Suite 810 Anchorage, Alaska 99501 State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99502 SUBJECT- SUBMISSION OF APPLICATIONS FOR SUNDRY APPROVAL FOR UPCOMING ACID JOBS ON MIDDLE GROUND SHOAL WELLS NUMBERS A44-11 AND A23-01 Gentlemen' Enclosed, in triplicate, are two Application for Sundry Approval forms for acid jobs to be performed on Middle Ground Shoal wells, A44-11 and A23-01. The coiled tubing unit acid treatments are scheduled to begin on June 26, 1987. If you have any questions, please contact Susan Brown at (907) 263-9613. Very truly yours, D. L. Yesland Manager Regulatory Affairs Alaska Division DLY/SBB/bc Enclosures 0625/MISC1 STATE OF ALASKA AL ,,A OIL AND GAS CONSERVATION CO ,,~ISSION APPLICATION FOR SUNDRY APPROVALS 1 Type of Request: Abandon [] Suspend F-1 Operation Shutdown [] Re-enter suspended well ~ Alter casing [] T~me extenmon ~ Change approved program ~ Pluggmng [] Sbmulate ~ Pull tubing r~ Amend order [] Perforate D Other [] 2 Name of Operator 5 Datum elevation (DF or KB) Shell Western E&P Inc. 116' DF 3 Address 6. Unit or Property name 601 West Fifth Ave., Suite 810, Anchorage, AK 99501 4 Locahon of well at surface Platform "A", Leg 2, Conductor 16. 7 Wellnumber 55.7'N & 57.42'E from center of Leg 1 ~ 1627'N & 435'W A 44-11 At top of productive~ntervafrom SE corner of Sec 11, TSN, R13W, S M.8. Permit number 1002'S & 179'W of surface location 67-35 At effective depth At total depth 1384'5 & 431'W of surface location feet Middle Ground Shoal 9 APl number 50-- 733-20027-00 10. Pool "G" Pool 11 Present well condition summary Total depth measured true vertical Effective depth, measured true vertical 9260 ' feet Plugs (measured) 8934 ' feet 91 51 ' feet Junk (measured) 8828' feet Casing Length Structural Conductor Surface 1 91 2 ' Intermediate Production 9211 ' Liner Perforation depth, measured S~ze Cemented Measured depth 10-3/4" 40 5# J-55 2200sx 1912' 7", 26-29#, N-80 7666'-9137' (10 intervals) true vertical 7423 ' -8811 ' Tubing (s~ze, grade and measured depth) 3-1/2" set ~ 7612' Packers and SSSV (type and measured depth) Packers set ~ 7580', 8219' True Verbcal depth 2350sx 9211 ' 12 Attachments Description summary of proposal J~ Detailed operabons program [] BOP sketch [] 13 Estimated date for commencing operation June 27~ 1987 14. If proposal was verbally approved Name of approver Date approved 15 I hereby cerbfy that the foregoing is true and correct to the best of my knowledge Signed ~/cl~,~,-~_ /~-"-, ~ Title Production Superintendent · /- ~' Commismon Use Only Conditions of approval Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test [] Locahon clearance I Approved by ., : ~: Form 10-403 Rev 1~-;i'-85 "~' ~" SBBF/asa.O1 Date 6/25/87 the commission Date ~ -~¢~¢-~::3; Submit ~n tnplmate ( PROGNOSIS A44-11 OPERATION: OPERATION TO COILED TUBING ACIDIZE LOWER HEMLOCK PERFORATIONS. TUBING: SEE ATTACHED COMPLETION EQUIPMENT DETAIL SHEET PERFORATIONS: SEE ATTACHED COMPLETION EQUIPMENT DETAIL SHEET STATUS: INJECTING 776 BWPD 0 $500 PSI 6/24/87 ACID REQUIREMENTS: 500 GALLONS 15~ HC! W/ INHIBITOR 1000 GALLONS 12~ HC1/ 3~ BP W/ INHIBITOR NOTE: ALL ACID IS TO BE FILTERED THROUGH 2-3 MICRON FILTERS. PROCEDURE: ].RU COILED TUBING UNIT AND PUMPING EQUIPMENT. RU TO TAKE RETURNS THROUGH CHOKE TO J-TUBE. SET UP SCREEN ON J-TUBE TO ALLOW MONITORING OF RETURNS AND RETENTION OF ANY RECOVERED SOLIDS. BULLET NOSE WASH NOZZLE IS TO BE SECURED TO 1 1/4" COILED TUBING WITH SWEDGE LOCK OR ALLEN SCREW CONNECTOR. WASH NOZZLE IS NOT TO BE THREADED ON DIRECTLY TO COILED TUBING_ TEST ACID FOR STRENGTH BY TITRATION METHOD. ~,_,~,~_ ~,;~_~ PRESSURE TEST ALL SURFACE EQUIPMENT FROM THE PUMP TO THE WELL HEAD TO 4200 PSI. '-!g87 ~. IF COILED TUBING CONTAINS DIESEL, FLUSH OUT TO PRODUCTION HEADER. MAINTAIN INJECTION PRESSURE ON COILED TUBIJ~NI~",EI~&.S~sCo~s, Gom,DIissJo~ CONTINUING TO INJECT WHILE RIH. CLEAN OUT 3. RIH INJECTING .5 BPM THROUGH CT. LIGHTLY TAG FILL, MINIMUM ACCEPTABLE CLEAN OUT DEPTH IS 9090'+/-. IF FILL DEPTH IS ABOVE THIS POINT, ATTEMPT TO CIRCULATE OUT WITH INJECTION WATER. BEGIN TAKING RETURNS TO J-TUBE. CONTINUOUSLV MONITOR RETURNS. IF HYDROCARBON OR H2S ARE PRESENT, TAKE RETURN TO PRODUCTION HEADER. CLEAN OUT TO AT LEAST 9090' SPOT 100 GALLONS OF 15~ HCL IF UNABLE TO CIRCULATE OUT FILL. ALLOW WELL TO BACKFLOW TO AID IN REMOVAL OF DEBRIS. KEEP RECIPROCATING COILED TUBING. DO NOT ALLOW COILED TUBING TO REMAIN STATIONARY. AT PBTD, CIRCULATE/BACKFLOW AN ADDITIONAL 92 BBL (CASING/TUBING VOLUME EXCLUDING CT) TO ENSURE FILL REMOVAL. ( ACID JOB 4. SHUT IN RETURNS. MAXIMUM ALLOWABLE PUMP PRESSURE IS 4200 PSI. WITH END OF COILED TUBING AT 9090' PUMP 250 GALLONS ]5~ HCL, ]000 GALLONS 12~ HCL/ 3~ HF, AND 250 GALLONS 15~ HCL AT 0.5 BPM. WHEN ACID REACHES THE EOT MOVE COIL UP AT 70 FPM TO 8644'. WHEN MUD ACID REACHES EOT, MOVE DOWN TO 9090'. MOVE END OF TUBING BETWEEN 9090' AND 8644' UNTIL ALL ACID IS DISPLACED INTO FORMATION. CONTINUE INJECTING WHILE POH. RD. DATE: / 2 3 4 5 6 7 8 9 10 11 COMPLETION EQUIPMENT DETAIL SHEET MGS A44-11 6/25/87 NO. ITEM 1. OTIS BALL VALVE 2. OTIS "XO" SLIDING SLEEVE 3. GUIBERSON UNIPACKER VII 4. CAMCO KBM MANDREL #1 5. GUIBERSON UNIPACKER VII 6. CAMCO KBM MANDREL #2 7. OTIS "XO" SLIDING SLEEVE 8. GUIBERSON UNIPACKER VII 9. CAMCO KBM MANDREL #3 10. OTIS "XO" SLIDING SLEEVE 11. GUIBERSON UNIPACKER VII APPROXIMATE TVD. MD. PSI OR 274 274 7331 7561 7364 7598 8037 8333 DUF~4Y 8072 8369 8161 8466 DUMMY 8166 8472 8198 8506 8230 8539 OR 1/8 8265 8575 8269 8579 CASING 10 3/4", 40.5#, J-55 ~ 1912' w/2200 sx ?" 26#, N-80 BUTTRESS ~ 0-8331' 29#, N-80 BUTTRESS ~ 8331-9211' w/1600 sx SQUEEZED ~ 7950' w/150 sx SQUEEZED ~ 7980' w/600 ax PBTD = 9151' TD = 9260' TUBING 3 1/2", 9.3#, N-80 EUE ~ 0-274' 9.3#, J-55 EUE ~ 274-8615' PERFORATED ZONE GROSS INTERVAL GN-GO GR-GS GR-GS HC-HD HC-HD HE-HF HI-ilK HK-HN HN-HR HR-HZ 7666-7701' 8076-8088' 8101-8123' 8399-8449' 8467-8504' 8519-8554' 8625-8656' 8669-8820' 8832-8986' 8986-9137' L STATE OF ALASKA ALAS OIL AND GAS CONSERVATION COM .~ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request' Abandon ~ Suspend F-] Operation Shutdown [] Re-enter suspended well [] Alter cas,ng [] T,me extension [] Change approved program [] Plugging [] Stimulate [] Pull tub,ng l~ Amend order [] Perforate ~ Other 2. Name of Operator 3. Address 601 ~st Fifth Avenue, Suite 810, kx:horage, Alaska 99501 4. Location of well at surface P]atform "C", Leg 2, C.z:~x~r 16. 55.7'N & 57.42'E from center of Leg 1 @ 1627'N & 435'W from SE corner of 5. Datum elevation (DF or KB) 116' DF 6. Umt or Property name Middle Ground Shoa 1 7. Well number A 44-11 At top of productive interval SeC. 11, T8N, R13W, S.M. 1002'~ & 179'W from su~ace Af effective dep[n At total depth 1384'5 & 431'W from surface 8. Permit number 67-35 9. APl number 50- 733-20027-00 10 Pool "G" Pool feett.~ 11 Present well condition summary Total depth: measured true vertical 9260' feet Plugs (measured) 8934' feet Effective depth, measured 9151 ' true vertical 8828' feet Junk (measured) feet Casing Length Structural Conductor Surface 1912' Intermediate Production 9211 ' L~ner Perforation depth measured S~ze Cemented Measured depth 10-3/4", 40.5#, J-55 True Vertical depth 2200sx 1912' 7", 26-29#, 7666-9137' N-80 2350 sx 9211' (10 intervals) true vertical 7423-8811' Tubing (size, grade and measured depth) 3-1/2", set @ 7612' Packers and SSSV (type and measured depth) packer set @ 7580' & 8219' 12 Attachments Descrmpt~on summary of proposal iX-I Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation 14 If proposal was verbally approved Name of approver Date approved 15 I hereby certify that the foregoing ~s true and correct to the best of my knowledge Signed ~'~'~'~ F ~.j~~,~,,~- Title Production Superintendent Commission Use Only Date 12/8/86 approval Notify commission so representative may witness I Approval Conditions of No [] Plug integrity [] BOP Test [] Location clearance RAT tests to be run in 1987 to demonstrate no fluid movement behind tubing above the top packer; at ].east one shot (in each ~ell) to demonstrate ab il~t~ .to see fluid movement behind t~byionr~ · '~ ~ ' ~of Approved by ~ ' ~,t'~:; ,~'4.~~'°'¢~''. ~.,...,.,-~. Commissioner the commission Date -' Form 10-403 Rev' i2-1-85 ~~-'""' -"~ /:...~ ~ ./'~.~ ~ Submit in triplicate ATTACHMENT TO APPLICATION FOR SUNDRY APPROVAL This Application for Sundry Approval is being submitted to present to the Commission Shell Western E&P Inc.'s surveillance plan to insure integrity of wells which indicate communication between the tubing and the tubing/casing annulus by elevated pressure in the annulus. The surveillance plan will use periodic (two to three year cycle) radioactive tracer surveys to determine if there is any fluid movement behind the tubing above the packer in the tubing/casing annulus. Between surveys annulus pressure and injection flowrate will be monitored. These values are reported to the Commission monthly. If, for unexplainable reasons, the flowrate increases by 25% or more, or the annulus pressure increases by 200 pounds or more, a radioactive tracer survey will be run to determine if there is flow in the annulus. This procedure will insure that no significant amount of water is injected outside of the waterflood interval. As all aquifers beneath the Middle Ground Shoal field are exempt aquifers, there is no threat to drinking water in the unlikely chance that an injection water leak should occur. 1211/MISC 'Z£.';' C' 'Z '2 ' --; / RETAIN THIS SECTION FOR YOUR RECORDS MGS A44-11 ' NUCLEAR FLOLOG PRINTS ~ NEG SEPIA 1 PRINTS 0 NEG 1 SEPIA PRINTS NEG. SEPIA PRINTS NEG. SEPIA PRINTS NEG. SEPIA -'G. ~ SEPIA PRINTS ~1~ ~'~ PRINT, G SEPIA // ~~_____~3 ,E PlA ABOVE RECEIVED ~0~/~ / ATTENTION JOHN ~YLE ~1986 SIGNED / ~ ~1 ~ Gas 6u,~ ~~lOa 19.~ __. STA'rk_ OF ALASKA AI_ASKA~' ,AND GAS CONSERVATiONCC/"MtSSION ~ _ DRILLING WELL [] COMPLETED WELL [~ Injector 99501 7 Permit No. 67-35 8 APl Number 50- 733-20027-00 9 Unit or Lease Name HGS Name of Operator SHELL 0IL COMPANY ' ~ddress ATTN: Wayne Simpson 601 H. 5th Ave., ~810, Anchorage, AK Local,on of Well 5 Elevation in feet (indtcate KB. DF, etc.) 116' D.F. Conductor 16, Leg 2, 55.7'N and 57.42'E from the Center of Leg 1, 1627'N and 435'W from SE Corner of Sec. 11, ~o WelINumber , T8N, R13@, S.H .... A 44-11 Fll F~eld and Pool ~ IIIDDLE ¢R0tJND SHOAL I"G" POOL 6 Lease Designation and Sar,al No ADL 18754 OTHER [] 12. Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO. SUBSEQUENT REPORT OF: (Submit in Tr~phcate) ISubmlt in Duplicate) I Peri,rate [] Alter Casing [] ~ Perforations [] AIterlngCas~ng [] St,,, ,J~ate [~ Abandon [] St,mulat~on ~1)( Abandonment [] :q ~'F =~r Well b~ Change ?Ians [] Repa,rs Made ~ Other Pdil Tu,}mg FI Other [] Pulling Tubing (~ote Report m,J~toie c~-ph,t,o-,~ on Form 10 407 A,th a submitted Form 10~07 for each completion ) 13 Oc,cr,be Proposed or Cc~np~,.'ed Operations (Cle,rly state ~II pertinent details and givc pertinent dales, mclt,d~ng -~tn.ated date of starting any ptcpo,ed ,~ork for &','~,d.,,, ,_nt see 20 A~C 25 103 170) , lZ/2~/82 Pi59cd up coil tubing unit and O0we]l acid e~:ufp,,~cnt. Plesvure tested J ~'verythin9 to swab valve to 5000 PSIfi. Started in hole with ~oil tul}il~g with 1.875" bullet and double check valve assy. bottom. Tagged fill at 9075' Made 3 ~asses t~rough perfs with coil tubing t.u,,~pinfi H20 ~ BPM rate ~ 4000 PSIG. 9075 -8696' Started pumping 685 gals. ~f 12% HCL '4 BPH rate ~ 4000 PSIG while moving C.T. through Derfs. (9075'-8696'). Displaced coil tubing with 15 BBLS H20. Let acid soffk for 30 rains, with C.T. set at 8696'. Started pumping 685 gals. 12,%-10% ttCL-HF acid BPM rate ~ 4000 PStG while moving C.T. through perfs (9075'-8696'). Displaced C.T. with 15 BB[$ H20. Let acid soak 30 mins. Repeated this procedure two more times. Started pumpinq 685 gals. of 12% HCL ~ N BPM rate ~ 4000 PSIG while moving C.T. through perfs (9075-8696'). Displaced C.T. with 15 BBls H20. Let acid soak for 30 rains. Pumped in 82 BBLS · of H20 while pulling C.T. out of well. Shut in master gate and started rigging down. ~~ ~ RECEIVED DEC 0 3 , 982 AP_sk~ Oil 2, G~.~ CDns. Cc.mm!sa!om 14 I hereby certify that the foregoing ~s true and correct to the best of ,-ny knowledge Apch0rage S,§ned2~ /~ T,,le Production Administration Date 11/29/82 The space below for Comrq~*slon use Conditions of ~,ppro~at ,f any ADp eyed by --¢o,,. '~ o~o3 Rev 7-I Sy ©r~.e¢ of CO,N;MISS~C%ER the Ccmm ss,on Date ...... ........................... S---. ',~n,,--:l-n;e-Ta:,-~-~s;' ,n Tr,p:,cate :nd '$db~eqbent Rcz.~rts',n Oupl,cate STATE OF ALASKA ALASKA ( .AND GAS CONSERVATION C~ MISSION SUNDRY NOTICES AND REPORTS OFt WELLS 1 DRILLING WELL [] COMPLETED WE LL)~ OTHER [] 2 Name of Operator SHELl OIL COMPANY 3 addres, Uayne Simpson 60] W. 5th Ave.: #8107 Anchorage, AK 99501 4 Locationof Well Conductor 16, Leg 2, 55.7' N and 57.42' 'E from the Center of Leg 1, 1627' N and 435'W from SE Corner of Sec. 11, T8N, R13W, S.M. 5 Elevation in feet (ind,cate KB, DF, etc.) 116' D. F. 12. Lease Designation and Serial No. ADL 18754 7. Permit No. 67 -35 8. APl Number 5c- '733 - Zoo- ZT- oo 9. Unit or Lease Name 10. Well Number A 44-11 11. Field and Pool HI DDLE GROUND SHOAL "G" Pool Check Appropriate Box To Indicate Nature of Notmce, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF: (Submit in Triplicate) Perforal~ [::::] Alter Casing !-] ~ Perforations St,mulale X~ Abandon [] Stlmulat,on Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note Report multiple completions on Form 10-407 w,th a submitted Form 10-407 for each completion ) (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13 Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170). SEE ATTACHED Subsequent Work Reported o NOV o !982 Alaska Oil &Ar/CborageGas Cons. ['°/nmiSsioa 14 I hereby certify that the foregoing is true and correct to the best of my knowledge Signed /~/~ T,t,e PRODUCTION ADMI,ISTRATION The space below for Co,remission use Date 10/21/82 Conditions of Approval, if any /Igoproved "opy Returned By Order of COMMISSIONER the Corem,ss,on Form 10-4(]13 Rev 7 1-80 Subm,t "Intentions" in Tr~phcate and "Subsequent Reports" in Duphcate Stimulation Prognosis A44-11 Status. Well injecting 1200 BDW in the HC through HZ zones. Objective- Stimulate the HK/HN, HN/HR and the HR/HZ zones using acid placed with coiled tubing. Procedure' (Note- shut-off injection + 48 hours before rigging up coiled tubing. ) - e e me ® ® Rig up slick line, test lubricator to 3500 psi. Run 2" drift tool and tag fill at_+ 9068'. Tag and record depth. Place dummies in mandrels at 8539' and 8466'. e e . M.I.R.U. coiled tubing and Dowell acidizing equipment. Test tree and coiled tubing to 5000 psi. Test hydraulic system. Run tubing in hole slowly (no more than 100 fpm). Circulate (while running in hole) using filtered inlet water with 3500 psi pressure on C.T.~. and + 1500 psi back pressure on tubing annulus. Tag fill at + 9068'. Make three passes through perforations (9068'-8669') while circuit-ting filtered inlet water. Tag fill at + 9068'. Spot 685 gal. 7% HC1 with 0.3% W-35 (anti-sludge), 0.2% F-75N (~urfactant), and 1.0% A-200 (inhibitor). Slowly move coiled tubing up hole while spotting acid in order to cover all perforations (9068'-8669') with acid. Pump 19 bbls. of injection water to clear coiled tubing. Pull up hole with coiled tubing to 8500'. Wait 30 minutes after clearing tubing and pump 16 bbls. of injection water to displace spent acid. Run coiled tubing to 9068' and spot 685 gal. of 12% - 10% HC1-HF acid with 1.2% A-200. Slowly move coiled tubing uphole while spotting acid in order to cover all perforations (9068' - 8669') with acid. Pump 19 bbls. of injection water to clear coiled tubing. P.O.O.H. with coiled tubing to 8500', wait 30 minutes after clearing tubing of acid. Pump 16 bbls. of injection water to displace spent acid. (Repeat steps 7 and 8 two times.) After repeating 7 and 8 the second time, spot 685 gal. of 7% HC1 with 0.3% W-35, 0.2% F-75N and 1.0% A-200 moving tubing uphole to displace acid across perfs (9068'-8669'). Clear tubing with 19 bbls. injection water. P O.O.H. with coiled tubing to 8500'. Wait 30 minutes and pump 30 bbls. ~f injection water to displace acid RECEIVED NOV 0 4 982 Alaska Oil & Gas Cons. Comn~ission Anchorage 10. Pump 100 bbls. injection water while moving coiled tubing up and down through treated interval. ll. P.O.O.H. and rig down. Put well on strip chart, return well to injection at 3500 psi and test. Report rates to T. S. Burns in Houston. Note: While working on water injectors, do not leave tubing standing in well without fluid movement. Blow coiled tubing with rig air after rigging down. If rig air is not available, cover coiled tubing reel and keep heated or circulate 50% methanol and 50% inlet water. Approved Date NOV 0 1982 Alaska Oil & Gas Con,~ AnChorage Coiled Tubing Stimulation Cost Estimate A44-11 · · · 4. 5. 6. 7. 8. 1370 gal. HCl @ $1.10/gal 5 gal. W-35 @ $33/gal 3 gal. F-75N @ $36/gal 14 gal. A-200 @ $34/gal 2055 gal. HCl-HF @ $2.4/gal 23 gal. A-200 @ $34/gal Pump 1.5 days @ $1,300/day Tanks 1.5 days @ $470/day Lines Personnel 1.5 days @ $924/day Miscellaneous Coiled Tubing Unit @ $15,000/day Transporation Total Say $ 1,507 165 108 476 4,932 782 1,950 705 2,000 l, 386 1,000 22,000 1,100 $38,111 $40,000 RECEIVED NOV 0 J 982 Alaska Oil & Gas Con~,. uo~,~mismon ~chorage ( A 44 - 11 DATUM 38' Item # · 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. Description M.D Otis ball valve nipple 274 Otis XO sliding sleeve 7561 Guiberson UniPacker VII 7598 Camco KBM Mandrel w/dummy 8333 Guiberson UniPacker VII 8369 Camco KBM Mandrel w/~o valve 8466 Otis XO sliding sleeve 8472 Guiberson UniPacker VII 8506 Camco KBM Mandrel-I/8" orifice8539 Otis XO sliding sleeve 8575 Guiberson UniPacker VII 8579 Otis X nipple 8628 Otis Q nipple 8642 Gui berson Shearout sub 8644 Casing_ Surface - 8264-+ (192 joints) 7" 26# N-80 Buttress ~B363-9211 (22 joints) 7" 29# N-80 Buttress Tubing __ _ Surface - 274 3.5" N-80 9.3#/ft. EUE 274-8644 3.5" J-55 9.3#/ft EUE Perforations GN-GO 7666-7701 HE-HF 8519-8554 H!-HK 8625-8656 (HHK-H,N'~ 8669-8820 HN-HRI 8832-8937 R-HZp 8937-9087 9087-9l 37 / RECEIVED NOV 0 z~ I982 Alaska Oil & Gas Cons. Commission Anchorage PBTD 9151 ~ TD 9260 Page 56 I I I' I ! . WESTERN E&P OPERATIONS .. [~IDDLE GROU~D SHOAL FIELD L i SHELL-ATLANTIC-STANDARD _ tt,,, ','"~,.," 11441 PATTERN '"~ 1-,~? ~;, _ I III I II I II , / ~4A~_~,_o, . t _ ~ / --'i _~m~/ , ' '~ ' f ...... ~ . / "~,-,0,-' ..... " ' i ~/o,-- ?' '. '"" !, ,/o-- ~.~/~ ',// I t , /; , ~, , , ~-8~ Z f~ , ,, : / ,34-~ t i PA. I i j ! f Io1111 -i I . INJECTION WELL 0 PRODUCING WELL -~-P.A. PLUGGED & ABND ~ · ~ ~ -- i iiii · ~ ii I i II I ' arctic coi ed tubing. nc: P.O. Box .$130 Anchorage, Alaska 99~10 , Telephone (907) 248-2344/338-2019 1/4" COII~D TUBING SPECIFICATIONS Actual O.D. Nominal I.D. Wall thickness Weight Wall area Flow area Tensile: Ultimate Yield Max. Operating 1. 250 in. 1. 084 in. 0. 083 in. 1. o34 lbs/ft. 0.304 in.2 0.925 in.2 22,800 lbs. 21,300 lbs. 17,000 lbs. Burs t: Ultimate Test press. Max. Operating 9,960 psi. 6,000 psi. 5,000 psi. Collapse: Ultimate Max. Operating 6,100 psi. 1,500 psi. Capacity: 1.141 Bbl/1,000 ft. 875 ft./Bbl. Wall displacement o. 3?7 Bbl/1000 Total displacement 1.518 Bbl/1000 ft. RECEIVED NOV 0 4 1982 Alaska 0il & Gas Cons. (;omm~s~qion Anchorage i '~.,I STATE OF ALASKA ~ ALASK LAND GAS CONSERVATION ~,vlMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL OTHER [] ~t~~ J£: 2 Name of Operator Shell 0J1 Company 3 Addre~ P.O. Box 92047 Worldway Center, Los Angeles, CA 90009 4 Locatlon of Well Surface: Conductor 16, Leg 2, 55.7' North and 57.42' East from the center of Leg 1 (1627' North and 435' West from SE corner of Sec. 11) 5. Elevat,on ,n feet (red,cate KB, DF, etc ) 116' DF Lease Des~gnat,on and Ser,al No ADL 18754 12. 7 Permit No 67-35 8. APl Number 50- 9 Un,t or Lease Name MGS "A" 850 10 Well Number 44-11 11. F,eld and Pool MGS Field G Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO. SUBSEQUENT REPORT OF: (Submit ~n Tr,phcate) (Subm,t ,n Dupl,cate) Perforate [] Alter Cas,ng D Perforat,ons [] Alter,ng Casing St,mulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repa,rs Made [] Other Pull Tubing [] Other (Note Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion ) ~ 13 Descr,be Proposed or Completed Operat,ons (Clearly state all pertinent detads and give pertinent dates, ,nclud~ng est,mated date of start,ng any proposed work, for Abandonment see 20 AAC 25 105-170) MIRU Schlumberger. Ran in hole with R.A.T. survey tool and casing collar log for depth control. Determined injection profile by making several stops to emit radioactive tracer material. POOH. Rigged down. Sul3seque-nt Work RECEIVED DEC,', , Alaska 0il & Gas Cons. Commission Anchorage 14 I hereby certify that the foregoing ,s true and correct to the best of my knowledge S,gnedjj._ _~' ./~/~ For' B. Nevil 1 T,t,eMqr~ ·, Production AdministrationDa,e .12/17/81. The space below for Corniness,on use Conditions of Approval, ~f any By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev 7-1-80 Submit "lntentsons" ~n Tr~pl,cate and "Subsequent Reports" In Dupl,cate (' SCHLUMBERGER OFFSHORE SERVICES A Divis,on of Schlumberger Limited HOUSTON, TEXAS 7700! PLEASE REPLY TO November 3, 1981 500 t W. International Airport Anchorage, Alaska 99502 Shell_Oil ~y 601 W. 5th Avenue Anct33rage, Alaska Alaska Operations Suite 810 99501 Attention: Production SuperinteDx~ent Gentlemen: Enclosed ore 1 BLprints of the ENG~ PRODUCTION LOG Compeny Shell Oil Ccmpany , Well Middle Ground Shoal A-44-11 Field Middle Ground Shoal , County ~ gtate. Alaska on: , Additional prints ore being sent to: ~rints Shell Oil ~y/Pacific Division P.O. Box 831 Houston; Texas 77001 Attention: Ed Scott 1 RFolded Sepia 1 -BL prints Atlantic Richfield ~y P.O.Box 360 Anchoraqe, Alaska 99510 Attention: J.w. Hart 1 BL prints Shell Oil ~y North Star Route ] Box 485 Kenai: Alaska 99661 1 BL prints Shell Oil Ccmpan¥ Western E& P Region P.O. Box 576 Houston, Texas 77001 Attention: E& P Files 1 RRolted Sepia 1BL pr,nts Chevron U.S.A. Inc. P.O.Box 7-839 Anchoraqe, Alaska 99510 Attention: C.F. Kirkvold 1 BL prints Amoco Production P.O. Box 779 Anchoraqe, Alaska 99510 Attention: L.A. Darsow /~~i]s Sepia State of Alaska Division of 0il & Gas Conservation"~, 3001 Porcupine Drive Anchoraqe, Alaska 99510 prints The film is returned to Shell Western E & P Region We appreciate the privilege of serving you. NOV 0 198! Very truly yours, Alaska Oil & Gas Cons. Commission SCHLUMBERGER OFFSHORE SERVICES Anchorage DISTRICT MANAGER SHELL OIL 430 7TH ANCHORAGE COMPANY AVENUE ALASKA 9950~ dlJL ~ 0 M68 Private and Confidential CONFIDENTIAL STATE OF ALASKA 3001 Porcupine Drive Anchorage, Alaska Attention T. R. Marshall, Jr. Gentlemen: Enclosed is our Sundry Notice for the acidizing of Well A-44-11 from our Platform "A". WC H: pmw Enclosure Very truly yours, Division Exploitation Engineer Form REV 9-30-67 Submit "Intentions" in Triplicate & "Subsequent Reports" in Duphcate STATE OF ALASKA OIL AND GAS CONSERVATION CONVVUI-rEE SUNDRY NOTICES AND REPORTS ON WELLS not use th~s form for proposals to drill or to deepen or plug back to a dfffierent reservoir Use "APPLICATION FOR PERiVIIT--" for such proposals ) OIL WELL [] OTHER 2 NAME OF Shell Oil Company 3 ADDI~k-~JS OF 430 Seventh Avenue~ Anchorage, Alaska 4 LOCATION OF WELL Atsurface Conductor 16, Leg 2 @ 55.70'N and 57.42'E from the center of Leg 1 @ 1627'N and 435'W from SE corner Section 11, T8N, R13W, S.M. 13 ELEVATIONS (Show whether DF, I~T, GR, etc 116' D.F. (MLLW) Check Appropriate Box To I~ndica~e N~ture of N~oti'ce, Re 50-133- 20027 ~ 6 L~E DESIGNATION ~D SE~R/~J~ NO ADL 18754 '~ IF INDIAN, ALLOTTEE OR TP,.IBE NAME None ~Nrr. F~m~ OR LF~SE NAMe. Middle Ground Shoal 9. WELL NO A-44-11 10 FIELD A2~-D POOL, OR WILDCAT Middle Ground Shoal 11 SEC , T , R , M , (BOTTOM HOLE OBJF~rr~VE) Section 11, T8N, R13W, S.M. 12 PEILMIT NO 67-35 ~, ~ Other Data NOTICE OF INTENTION TO: TEST WATER BHUT-0FF ~ PULL 0g ALTER CASING SUBSEQUENT REPORT OF: 8HUT-0FF ~--~ REPAIRING WELL WATER FRACTURE TREAT [__[ MULTIPLE COMPIETE FRACTURE TREATMENT [ [ ALTERING CASING SHOOT OR ACIDIZE ~__~ ABANDONs ~~ ACIDIZINO ABANDONMENTs REPAIR WELL CHANGE PLANS (Other) .... [ [ (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form ) 15 DESCRIBE PROPOSED OR C0%fPLETED OPERATIONS (Clearly state all pertinent details, and ~ive pertinent dates, includin~ estimated date of startin~ an) proposed work. 7-4-68 Moved Rig over A-44-11. Flanged up and tested B.O.P.E. Pulled %ubing. 7-5-68 Spotted 3500 gallons, 10% HF - 12% HCL inhibited acid. Squeezed 2318 gallons acid through perforated intervals 8633-9145' with maximum surface pressure of 110 psi. Reversed out 1182 gallons acid with water. 7-6-68 Spotted 2500 gallons, 107o HF - 127o HCL inhibited acid. Squeezed 2398 gallons acid through perforated intervals 8634-9145' with maximum surface pressure of 300 psi. Reversed out 102 gallons acid with water. 7-7-68 Spotted 1500 gallons, 107o HF - 127o HCL inhibited acid. Squeezed 1500 gallons acid through perforated intervals 8633-8774' with maximum surface pressure of 250 psi. Flushed out annulus with water. 7-8-68 7- 9,-68 Landed 3-1/2" N-80 EUE tubing at 8607' with packer at 8586' Commenced water injection 12:00 noon 7-9-68. R E £ E IV [ 0 AUG 1 1968 16SIGNEDI hereby ~certify -- -- ' ' - correct DIVI,.SlON OF MINES & MINERAL.~ ANCHORAGE JUL ~ 0 l~a TITLE Division Exploitation Eng. DATE (This space for State office u.se) CONDITIONS OF APPROVAL, IF AN~: ¸!, ! ' ~ ., DATE } //~ - See instruct*ions On Reverse Side SHELL OIL COMPANY 430 7TH AVENUE ANCHORAGE. ALASKA 99501 September 11, 1967 CONFIDENTIAL MATERIAL STATE OF ALASKA Division of Mines & Minerals 3001 Porcupine Drive Anchorage, Alaska Attention: T.R. Marshall, Jr. Gent lemen: Attached are two copies of the Well Completinn Report for our SAS Middle Ground Shoal A-44-11. Included with the report are the following data: Composite Log (Sepia and Print) Directional Survey Well History JDM:mw Very truly yours, R.D. Allen Division Exploitation Engineer Attachments RECEIVED 5EP 1 2 1987 DIVISION OF MINES & MINERALS ANrH©RAGE S/ATE OF ALASKA (Se~ot't,~rln- st ructioRs on OIL AND GAS CONSERVATION COMMITTEE reverse side) WELL COMPLETION OR RECOMPLETION REPORT AND LOG* IR. 'i'X~E OF WELL: OIL ~ GAS WELL WELL ~_] DRY [---] Other l~ TYPE OF COMPLETION: NEW WELL ~ WORK OVER [~ DEEP- EN ~-~ PLUG BACK ~'~ DIFF nESVR ~--] Other 2. NAME OF 0PERAT0a Shell Oil Company 3 ADDRESS OF OP~:RATOR 430 Seventh Avenue, Anchorage, Alaska 4. LOCATION OF WELL (Report location clearly and in Gcoordanoe with afly grate requirements)* Atsurface Conductor 16, Leg 2 @ 55.70'N & 57.42'E fr center lek 1 @ 1627'N & 435'W fr SE corner Sec 11 At"top prod. interval reported below ° 1002'S & 179'W from surface At total depth ,API ~50= 133- 20027 ~ ~ Effective. July 1, 1964 {~(~ . 5 LEASE DESIGNATION AND ~ERIAL NO ADL 18754 6 IF INDIAN, ALLOTTEE OR TRIBE NA%IE None 7 UNIT AOREEMENT NAMe. None 8 FARM OR LEASE NAME M.G.S. 9 WELL NO A-44- 11 10. FIELD AND POOL, OR WILDCAT .... Middle Ground Shoal. Il. SEC , T , R , M., OR BLOCK AND SURVEY OR AREA Sec. 11, T8N, R13W 1384'S & 431'W from surface 14 PERMIT NO 20. TOTAL DEPTH, ~WD & ~ ] 21. PLUG, BAC~ T.D., MD & TYD ] 22. IF MULTIPLE COMPL , 23 INTERVALS ] ] HOW MANy$ [ DRILLED BY 9~60 (g934) I 9151 (8828~ I ~ 24. pRODUCinG iNTErvAL(s), OF THIS COfiPLETIO~--TOP, BOTTOM, NAME (MD AND TVD)S 7666 (~;415) - 9137' (8814) 26. TYPE ELECTRIC AND OTHER LOGS RUN DATE ISSUED i2. BOROUGH I 13 STATg [ '-]-~ -Y~ I Ala________ska 18 ELEVATIONS (DF, RISB, ET, OR, ETC.) $ ~ 19. ELEV. CASINGH~AD ROTARY ~OLS CABLE TOOLS I 9260 I J ~8 ~A8 ~I~CtlONiL Yes DIL, BHC, GR-CBL 28. CAS~INO SIZE WEIGHT, LB/FT. 10-3/4" 40.5 7" 26 & 29 CASING RECORD (Report all strings set in well) DEPTH SET (MD) HOLE SIZE CEMENTING RECORD 1912 15" 2200 sacks 9211 9-7/8" 2350 sacks SACKS CEMENT$ ; 8101-8123' ; 8519-8554' ; 8832-9087' 29 LINER RECORD SIZE TOP (MD) BOTTOM (MD) · i' PERFORATION RECORD ~ 7666-770~'; 8076-8088' 8399- 8449'; 8467- 8504' 8625-8656'; 8669-8820' 9097-91~7 '; 33 * 27 WAS WELL CORED No AMOUNT PULLED None None SCREEN (MD) 32. ACID, SHOT DEPTH 'INTERVAL (MD) 30 TUBING RECORD SIZE I DEPTH SET (MD) PACKER SET (~fD) 3-1/2" ~ _ 7580 a 8219 FRACTURE, CEMENT SQUEEZE, ETC. AMOUNT AND KIND OF MATERIAL USED PRODUCTION DATE FIRST PRODUCTION I ~ s~ft DATE OF TEST I HOURS TESTED ICHOKE SIZE FLOW. TUBING PRE~S. ICASING PRESSURE ICALCULATED 24-HOUR RATE 70 930 ~ 34 DISPOSITION OF GAS (gold, used Ior fuel, vented, etc.) PRODUCTION METHOD (Flowing, gas lift, pumpm~ and type of pump) PROD'N. FOR 0 II-.---BBL GAS--MCF WELL STATUS (Produc*ng or shut-in) Producing TESTPERIOD [ I ~ 778 413 OIL--BBL GAS~MCF. WATER--BBL GAS-OIL RA~I~O I 24 531 WATER--BBL. 778 [ 413 OIL GRAVITY-API (CORR ) 35.1 Vented 35 LIST OF ATTACHMENTS TEST WITNESSED BY Well History, Directional Survey, Composite DIL (print & sepia) 36 I hereby eer~~]j~L~..~; information Is complete ~[~'~~om all available records SIGNED /// g~r _ TITLE Division Exploitation En-inee - !V'F D INSTRUCTIONS ,~rm is designed for submitting a complete and correct well completion report and log on all types of lands and leases to either a Federal agency or a State agency, ,~t to applicable Federal and/or State laws and regulations Any necessary special instructions concerning the use of this form and the number of copies to be ~L. ularly w~th regard to local, area, or regaonal procedures and practices, e~ther are shown below or ~vHl be issued by, or may be obtained from, the local Federal I~ce See instructions on items 22 and 24, and 33, below regarding separate reports for separate completions ,r to the time this summary record is submitted, copies of all currently available logs (drillers, geologists, sample and core analysis, all types electric, etc )~ forma- ~re tests, and directional surveys, should be attached hereto, to the extent required by applicable Federal and/or State laws and regulations All a~tachments on this form, see atem 35. ,~ are no applicable State reqmrcments, locations on Federal or Indian land should be described an accordance with Federal requirements. Consult local State for specific instructions. nte which elevation is used as reference (where not otherwise sho~vn) for depth measurements g~ven in other spaces on th~s form and in any attachments If this well is completed for separate production from more than one interval zone (multiple completion), so state in item 22, and in item 24 show the producing ~valn, top(s), h(~ttom(.~) nnd ~amc(s) (~f any) fo~ only the ~nlc~val ~Cls)rted In item 33 Submit a sel)arat~, ~('p(~rt (page) on th~ form, ad~qluately l(]Cll~llt('(], hal interval to be separately produced, showing the add~twnal data pertinent I~ ~u( h interval Cement": Attached supI~lemental records for th~s well should show the detall.~ ~)f any multiple stage cementing and the location of the cementing tool a separate completion report on thru form for each interval to be separately produced (See instruction for ~tems 22 and 24 above ) .. POROUS ZONES IMPORTANT ZONES OF I'OROSIT¥ AND CONTENTS THEREOF, CORED INTERVALS, AND ALL DRILL-STEM TESTS, INCLUDING 38 GEOLOGIC MARKERS I'ERVAL TESTED~ CUSHION USED~ TIME TOOL OPEN, FLOWING AND SHUT-IN PRESSURES, AND RECOVERIES __ TOP I i~)lqOM DESCRIPTION~ CONTENqs~ ETC TOP --- NAME MEAS DEPTH TRUE VERT DEPTE __ Pool E 7655 7405 Pool F 8034 7752 : Pool G 8399 8098 DH-12 Operator= Shell 0tl Co. Lease No: ~ ~. i~'754 ........ or Owner -~ O' $1~ ............. We ! i No, =A _'~_'lA.1 .... Area A.f . COOE_ A. Re lease Date__.9.12.69., State of Alaska Department of Natural Resources DIVISION OF MINES AND MINERALS Pet roleum Branch INDIVIDUAL WELL RECORD Location (Surface) Loc. (Bottom) Sec. 11 _ il , ~ .... T. 8t,l R. 13 ~/ S Meridian Permit No. 67-35 I s sued 7-9-67 ,, _ _ Cored. 16, leg 2 1_683'L ,FST .& ._378' m A..Sec. 299' l~SI. & 809' iq!:I.. Sec[ HtGtSt Spud Date ..... .7-9-67 Drill lng Ceased 8-12-67 Total Depth 9260m _ . _~ , i. _~' ~ 'J .... , il _ --~'L Suspended .... Abandoned Elevation ~116' Completed (F-GL-P) 8-12-67 IP 778 B/D, Grav 35.1 APl Cut 3.0 I Il .I i~ - I.]1111 I _ __ ~ ~ ]~ _-_ i i __ . i . ~ I~_ 1~1~ _ IlL Gas _. 413 ~Cr/O, Bean 12~ - ~L - _l, Casing: Siz~ ~ SxCmt. 7" 9211 2350 CP 930 psi, TP 70 psi III - ~- ~ - - - I I ..... I~ I~1~ _ Parr: 7666~-7701~ 8076~-808~I~gs ...... ~iLO:t~.Z3~t-8399.8449~;~ · , 8~9e-850~*i 8519-54; 86~t-56~1 9097~-9137~. ~" tb_$: 7612' Iqcrs.7580' ....... --n--- 8219~ .................. -: ....... ,.,. - ............ - _ GEOLOGIC FORMATIONS PRODUCTIVE HORIZONS Surfac~ Lowest Tested Name Depth Contents --~ :£ _11 I[IL L _1 _ _ ,[ ,1 __ ~ __1~ _[ iiI iiL i_ i.~ _ L.~L Year Jan re~b~ Har Apr : ~- i LI'LU I -- l_ ~ l, l Jill t WELL STATUS May, ~June ......... July Aug Sept O~ct~ Nov Dec - - _ .,2-:-_: -i-:,,~:,-_-,--: ..~..~ ..~ ..... :' i_._~.'-... ='r'.-_.~.,~.]-L: . ."' FJ'4/~ (Rev. 5-63) P~m~.d ~, U.S.A. · Middle Ground Shoal (COUNTY) _ 'i DAY I · FRO'-4 TO July 1~67 310 10-11/ 780 12-2C 21-24 25-21 27-2 1912 6968 8428 8515 780 1912 6968 8428 8515 8979 DI( .LL!I G RB O T E011 P~--r~OD ~'NrD~:G ,11 July 29, 1967 T8N' R13I~ S M (TOWNSHIP 0~ Location: Leg 2, conductor 16 @ 55.70'N & 57.42'E from center leg 1. Leg 1 @ 1627'N & 435'W from southeast corner Section 11~ To~ship 8 North~ Range 13 West, Seward Meridian. Elevation: Derrick Floor at 116' (MLLW) Rigged up over conductor 16. Spudded 10:00 a.m. 7-9-67. Cleaned out 310-360' with 15" bit. Ran turbo drill #1, 360-405' facing N45W. Drilled 15" hole to 780'. CEMENTED 10-3/4" CASING AT 1912' WITH 2200 SACKS. Drilled 15" hole to 1912'. Ran 48 joints 10-3/4", 40.5# J-55 casing with guide shoe at 1912' and Baker fill-up collar at 1867'. lumped 30 cu. ft. water ahead of 1700 sacks Class A cement (115 pcf slurry). Displaced with 1066 cu. ft. mud. Bumped plug with 1500 psi. No cement returns to surface. Flanged up casing. Ran 1-1/2" pipe outside 10-3/4" casing to 200' below well head. Pumped in 500 sacks Class A cement (116 pcf slurry). No returns to surface. Flanged up BOPE. Tested pipe rams and Hydril Ok wit-~~O psi. Cleaned out cement 1868-1911' drilled out shoe at 1912' with 9-7/8" bit Mud 73 pcf, turbo #2, 4504-4596' faced S10E. Turbo #3, 4797-4864 faced S45E. Drilled 9-7/8" hole. Mud 71-72 pcf. Drilled 9-7/8" hole to 8515'. Stuck pipe at 8398' while reaming. Spotted 15 bbls crude and 12 bbls Macco lube. Move 5 bbls each hour. Unable to work loose. Spotted 60 bbls crude in pipe and 15 bbls outside. Worked pipe~ moving oil at 5 bbls each hour. Ran Dia-log on Schlumberger wire line; showed tools stuck at 8398'. Ran string shot~ backed off at 8368'. Ran in with jars and bumper sub~ latched onto fish-jarred free. Ran in, reamed 8368-8515'. Drilled 9-7/8" hole. Mud 71-72 pcf. c~ CONDITION AT E~'~"INNI'NIS; OF PERIOD 10-3/4" 9-i/8 ~[.t. mP~5,, 19. DEPTH 1912' RECEIVED SEP 12, 1967 DIVISION OF MINES & MINERALS AI',~ ~I~GE P'D'~A (Rev. 5-63) P~inted ,n U.S.A. · Middle Ground Shoal --_ (FIE, I,D) Cool< Inlet, Alaska (COUNTY] · DAY I DEPTHS 8976 9156 9156 9260 9260 PBTD 9151 PBTD 9151 PBTD 9151 PBTD 9151 PBTD 9151 Drilled 9-7/8" hole. Ran Schlumberger DUAL INDUCTION - LATEROIDG. RUN 1: 1915-1938'; BORE HOLE COMPENSATED SONIC LOG: RUN 1~ 5500-9130'. Drilled 9-7/8" hole. Conditioned hole for casing. CEMENTED 7" CASING AT 9211'. Ran 213 joints 7", buttress casing (bottom 22 joints 29~/, 192 joints 26#) N-80, with shoe at 9211' and baffle at 9166. Mixed and pumped in 1600 sacks class G cement. Pressure rose to 4000 psi after displacing 600 cu. ft. sea water. Flanged up 7" casing, changed BOPE to 3-1/2". Layed down 5" drill pipe. Ran in 3-1/2" drill pipe, hit top cement at 2600' drilled cement to 9151. Ran CEMENT BOND LOG. RUN l_z 1900-9143'. Perforated 4 holes at 7980'. Set DM retainer at 7920'. Circulated through perforation. Pumped in 200 cu. ft. water ahead of 600 sacks class G cement, mixed with 1% CFR-2. Displaced with 330 cu. ft. mud. Unable to work cement bond log sonde to bottom. Cleaned out cement stringers. 7273-7920'. Ran CEMENT BOND LOG. RUN 2: 6500-7902'. Drilled out retainer at 7920' and cement to 8028' . , cleaned out to 9151' Pressure tested casing ok with 2000 psi. Perforated 4 holes at 7950'. Ran retainer - set at 1535' while running in. Drilled out retainer, cleaned out to 9151'. Ran retainer - set at 3954' while running in. Drilled out retainer. Shot 4 holes at 7702'. Ran DM retainer on Schlumberger wire line - retainer stuck at 6540'~ recovered retainer. Ran Baker K retainer on Schlumberger line, set at 7714'. Stabbed 3-~1/2" drill pipe in retainer~ circulated through holes, at 7950' with returns through perforations at 7702'. Pumped in 150 sacks class G cement (117 pcf slurry) mixed with 1% CFR-2. CONDITION AT CASINg SiZE 10-3/4" 7" HOLE I 3 o1 9 2 [3.3~/ ]<SLO OF PERIOD nd 1912' 9211' RECEIVED 1 2 1987 DIVISION OF MINES & MINEP-,AL~ ANCHr3RAGE ?% ?'r" PDt4^ (Rev. 5~63) P[mtcc hi U.S.A. i~o .__~,~Ji~__d~e Ground Shoal (FIELD) ~k Inleg, Alaska (COUHTy) DAY' DEPTHS FROM J TO Aug. 1967 9 PBTD 9151 10 PBTD 9151 11 PBTD 9151 12 PBTD 9151 Drilled cement 7650-7714'. Drilled out retainer at 7714' and cement to 7946'. Cleaned out and conditioned mud. Ran CEMENT BOND LOG. RUN 3~ 6500-9140'. Changed from mud to salt water to diesel. Layed down 3-1/2" drill pipe and began running 3-1/2" tubing. Temporarily landed tubing with tail to 7612'. Perforated with four jets per foot 7666-7701'; 8076-8088'; 8101-8123'. Released tubing, ran in to 8318' with packers at 8219' and 7580'. Installed tree, set packers at 8219' and 7580'. Opened sliding sleeve valve at 8203'. Perforated with 4 jets per foot, 8399-8449; 8467-8504'; 8519-8554'; 8625-8656'; 8669-8820'; 8832-9087'; 9097-9137'.. Ran static pressure survey. Released rig at midnight August 12, 1967. CONDITION AT ~ PERIOD CAGING GIZE 10-3/4" 7" DEPTH Ski' 1912' 9211' HOLE $1Z~ FROH TO 1-- 15" i 31°1:~ ~12 DRILL PIPE - --~I RECEIVED stop 1 1967 DIVISION OF: MINES & MtNER~I.~ AN('H~RAGE VERTICAl DEPTH CUM BEARING LATITUDE DEPARTURE ;;/r. AS. I~-..' . !t DEPARTURE SECTIOIS '.: , ~/~. ANCLE ., OF LATiiUDE ~PTHIDiST COURSEI TOTAL LOSS DEVIATION NORTH SOUTH EAST WEST NORTH ' sOUTH EAST WEST . . h , ,lc:, J~ i i i q~; (,"t_ ,, , i SHELL OIL 430 7TH ANCHORAGE COMPANY AVENUE ALASKA 99501 September 5, 1967 CONFIDENTIAL MATERIAL STATE OF ALASKA 3001 Porcupine Drive Anchorage, Alaska Attention: T.R. Marshall, Jr. Gent lemen: Enclosed are the Monthly Report of Operations (2 copies each) for August, 1967, for our Middle Ground Shoal wells, A-44-11 and A-42-14. Very truly yours, JDM:mw Division Exploitation Engineer Enclosures RECEIVED SEP 8 1667 ~IVI$1ON OF MINES & MINEit,~ ANr"~AGE Form No. , API #50-133-20027 Effective July 1, 1964 STATE OF ALASKA .~,,.,o OIL AND GAS CONSERVATION COMMITTEE LE$$EE'$ MONTHLY REPORT OF State ..... Alaska ........................ Borough ........ I~_~a_%_ ..................... F/eld ...... M_i_d d 1 e___._G_r_ .o_._u.n._d___.S__.h._o..a.__l_ ...................... The followin~ is a eorreot report of operations and prod~etion (inel~di~ drillin~ and prod~ein~ wells) for the month of ........ AOg.O_~_C ...................... 19~__7_ ................................................................................ .4~ent's address ......... ~_3__Q___S__e__y_e__n__t__h___.A.y_.e_.n__u._e_ ...................... Company_~~~.2~i~_.m~__a_ ......................... ..... ~_n_c_h_o_ r_ ag.e_ .,__ Al__a__s_ k_._a_ ...................................................... $i.~nea ___~__~~ ....................... Phone .... _2_12.-_9_5__~_1 ............................................................... .g ~ en t ' s title _D__~_y._~_.s_~_o__n____E__x_p__l__o_~.t__a__t__~_o_B__.E_gg_~_g~er SEC. AND ~o~ S.A.S, Drill~ Ran 3- Perfo~ Relea'~ TwP. ~d 9 1/2 'ate ed 7/8" tub 4j ig m WELL NO. ho1 ,ng ,ts ,dni )P, OI~UOID ~--11 to ~. o 76] ar fc ht At BARREL8 Or OIL 1260 '. Cern .2', set pa .ot 7666-77 8469-85 8832- 90 .gust 12, 1 ORA' ent cke 01' 04' 87 ' 967 r? Or. F~. o~ GAS (In thousands) :d 7" casing :s at 7580' ~07 6- 8088 ' 3519-8554' )097- 9137 ' (]ALLONS OF GASOLINE RECOVERED at 9211' Lnd 8219' 8101-81 8625-86 BARREL8 OF WA~E~ (If none, ~o state) with 23. ° 23' 839' 56~ 866' REMARKS (If drillu~, depth, ~f shut down, oauz~, date and result of te~t for ga~olu~ content of 50 sacks. 8449', )-8820', NOTE--There were ............... runs or sales of oil, . M cuft of gas sold, runs or sales of gasoline during the month (Wrote 'no" ..'here applicable ) NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Division of Mines & Minerals by the 6th o£ the succeeding montl~u~lel~, (l~h,rlv~e~ ~. directed i~ ! VI~ U DJVJSJON OF MINES & MINERAI.~ SHELL OIL COMPANY 430 7TH AVENUE ANCHORAGE. ALASKA 99501 August 1, 1967 CONFIDENTIAL MATERIAL STATE OF AIASKA Division of Mines and Minerals 3001 Porcupine Drive Anchorage, Alaska Attention: T.R. Marshall, Jr. Gent lemen: Enclosed are the Monthly Report, of Operations (2 copies each) for July~ 1967, for our Middle Ground Shoal wells A~3~ and A-44-11. JDM:mw Enc lo sure s Very truly yours, ~.~. Allen Division Exploitation Engineer RECEIVED ^ucl ~ 19~? DIVI,SlON OF MINES & MIN[::RAL~ ANCHORAGE Form No P--4 STATE OF ALASKA A? #50-133-20027 Effective July 1, 1964 LAND OFFICe' OIL AND GAS CONSERVATION COMMITTEE LEA~ ~UM.~ ADL 18754 L£~,SE nl~ UNIT NAI~£ LESSEE'S MONTHLY REPORT OF OPERATIONS State ........ A!a~__k__a_ ..................... Borougl/ ..... .K__e..n___a_.i__ ...................... F/eld ..... _M.i_d d 1 .e_____G.r.. _°__u_n_.d_.___S.h._°.__a__l_ ...................... Tke followin~ is a eorreot report of operations and production (inel~din~ drillinff and prod~einff wells) for tke montk of ................. _J__u_~y_ ................. 19___6_.7_ ............................................................................. vl~ent's address _.__430._$e_ven.Ck_Av_e~ue ............................ Company __~_~___e__l__l____O._i_.l___,C~_m_p__a_.n_;g ................ ............................. .............................. ..... Phone ...................27_2_-_95_41 ................................................ .4 ff e r~ t ' s title ___D_.i__v__i_s__i__o__n___.E__x_p_!_Q._i__t__a__t__i__o__n____E__n_g_i_neer SRC. AblT~ Pi ov Pi Twp. SAS M S A Spudd d 7 Cemen' ed Drill, d 9 RANGR 44- l 9-67 o-31 7/8" ~rEI~ I ho] ille, 0.5# to BABERL8 OF On'. 15" to 1! J-55 cas '156, ran ,12'. ng at ,ogs. Cu. F~ oz GAs (In thousands) OALLONS OF OASOLINE RECOVERED 1912' wit 2200 s/cks. BARREL~ OF WA'rEa (If none, so state) REMARKS (If clrillmg, depth, if shut down, caul. dat~ and result of test for gasolum co. tent, of ass) NOTE--There were .................. runs or sales of off, M cu ft of gas sold; runs or sales of gasoline during the month (Write 'no" where applicable ) NOTE--Report on this form ~s required for each calendar month, regardless of the status of operahons, and must be flied In duphcate with the Division of Mines & Minerals by the 6th of the succeeding directed VI:L) AUG 2 1967 DIVISION OF MINES & MIINERAI.5 AJNCHORAGE Bm: Ihmr SLz~: M SA- lB M 1/67 ( EMORANDUM FROM: State of Alaska DATE : SUBJECT~ ~M SA- lB / MEMORANDUM State of Alaska FROM: DATE : SUBJECT~ SHELL OIL COMPANY 430 7TH AVENUE ANCHORAGE. ALASKA 99501 June 27, 1967 PRIVATE & CONFIDENTIAL STATE OF ALASKA Division of Mines & Minerals 3001 Porcupine Drive Anchorage, Alaska Attention Mr. T.R. Marshall, Jr. Gentlemen: Enclosed for your approval is our Application for Permit to Drill well SAS M.G.S. A-44-11. The well will be directionally drilled to bottom in the SE/4 of the SE/4 of Section 11, T8N, R13W, S.M. Also enclosed is our check in the amount of $50.00 for the filing fee. This well is to be drilled in the same quarter section being produced by M.G.S. A-43-11. We request your approval to drill this well with the understanding that only one of these two wells will be produced from this zone in this quarter section until such t~me that an order may be issued allowing more than one producing well per quarter section. Very truly yours, R.D. Allen Division Exploitation Engineer Enclosures: Filing fee check (1) Application To Drill (3) Location Plat (3) Blowout Prevention Program (3) RECEIVED JUN DIVISION OF MINES & MINEIJA~ A~CHORAGE Form P--1 ( STATE OF ALASKA AP1 #50-133-20027 SUBMIT IN T~ ICATE* Effectx~e July 1, 19~ (Other instructions on reverse side) OIL AND GAS CONSERVATION COMMITTEE APPLICATION FOR PERMIT TO DRILL, DEEPEN, OR PLUG BACK la. T,EOFWO-- DRILL [] DEEPEN I---I PLUG BACK I---I b.T.EOFWELL SINGLE ~]M~LTIPLE ~ WELL ~ WIIT'T' 2. NAME Of OPERATOR Shell 0il Company 3. ADDRESS OF OPERATOR 430 Seventh Avenue, Anchorage, Alaska 99501 4. lOCATION OF ~ml~ ,(Re .port lo~on e~early y~d in_accosdan~e witl~ gny.~tate_ remuJr~ements.*J_ At surface uonauccor~o, Leg Conductor £O @55.70 N & 57.42' E from center Leg 1 @ 1627'N & 435'W of Section 11, T8N, R13W, SM At proposed prod. zone Section #23 below 14. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* 18 mi~es Northwest of Kenai~ Alaska l§. DISTANCTM FROM PROPOSED* LOCATIO, TO N,AR.T 400~ PROPERT3~ OB LEASE LINE, FT. (AI~o to n_ea~rest drlg. unit line, if any) ~I~. DISTANCE FROM PROPOSED LOCATIONs TO NEAREST WELL, DRILLING, COMPLETED, OB AFPLTII~ FOR, ON T'I~TSI T'mimm; FT. 1200+- LEASE DESIGNATION AND SERIAl, NO ADL 18754 IF INDIAN, ALLOTTEE OR TRINE NAME None 7. UNIT AGREEMENT NAME None 8. FARM OR LEASE NAME M.G.S. 9. WELL NO A-44-11 10. FIELD AND POOL, OR WILDCAT Middle Ground Shoal 11. sec, T, a, M, OR ELK. AND SURVEY OR AREA Sec 11, TSN, 12. BOROUGH SHI 13. STATE Kena i Alaska 16. No. OF ACRe-, IN LEAS~J ~7. SO. OF ACS_~a ASSIGNED --- TO THIS WELL I 8o 19 PROPOSED DEPTH j 20 ROT~Y OR CABI,E TOOLS 9150 J Rotary ~. APPROX. DATE WORK W!~!, STARTS 7-6-67 21. ZmVX~0~S (Show whether DF, RT, GR, etc.) 116 ' D.F. 23. PROPOSED CASING AND CEMENTING PROGRAM 15 9-7/8" / SIZE OF CASING WEIGHT PER FOOT SETTING DEPTH 10-3/4" 40.5 1850 7" 26 - 29 9150 Top: 7560'+- MD (7350'tTVD) Bottom: 9100'* MD (8750'-+TVD) Mid Point: 660'+-N& 700'~ W of SE Corner Sec. 11 QUANTITY OF CEMEN~ 1700 sacks 1600 sacks 8310'* MD (8040'+-TVD) 70'~N & 850'~W of SE Corner Sec. 11 380'-+N & 770'~W of SE Corn~mrSec. 11 IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to deepen or plug back, give data on present productive zone and proposed new productive zone. If proposal is to drill or deepen directionally, give pertinent data on subsurface locations and measured and true vertical depths Give blowout preventer program, if any. 24 I hereby c~d Correct. TiTLEDivision Exploitation Engine~T~ sIGNED (This space for Federal or State o~ce use) PERMIT NO ~7- 5K CONDITIONS O~ APPROVAL, IF ANY: Subjec~ to Emergency Order da~ed July 9, 1967, Conservation File #48. *See Instructions On Reverse Side APPROVAL DATE THOMAS R MARSHALL, TITLE EXecutive -%cretcr'f Alaska 0~1 & gas ~,.onservation C,,qm~ tree RECEIVED JUN 2 r., DIVISION OF MINDS & MINERAI.~ ANCHORAGE. DR lNG, CASING, ~aND BLOWOUT PREVENTzON PROGRAM WELL A-44-11 ! MIDDLE GROUND SHOAL - PLATFORM "A" COOK INLET, ALASKA le . e . e Move rig over 24" subconductor 16, Leg 2. Install 20", 2000 psi Hydril preventer. Drill 15" hole to 1850'+. Run 1850'+ of 10-3/4" 40.5# J-55 Seal-Lock casing. Cement with 1700 sacks API Class A cement. Land casing and flange up 12" 3000 psi preventer stack consisting of Double Shaffer Gate and G.K. Hydrilo Drill 9-7/8" hole to 9150'±. Run logs. Run 9150'± of 7" Buttress casing: 9150' - 8400', 29# N-80; 8400' - casing head, 26# N-80. Cement wigh 1600 sacks API Class G cement. Perforate productive zone with 4 shots per foot at selected intervals° Run 3-1/2" 9.3# J-55 and N-80 EUE tubing string equipped with packers. Displace annulus above packers ~ with inhibited Inlet water and displace tubing and annulus below packers with diesel oil. Set packers and place well on production. .~~ ~.R. Judd 6/26/67 RECEIVED DI',/I$1ON OF MINES & /v'l, lNrR/~. ANCH.)RAGF., T. 8 N., R. 32-11 A-42-11 A- 43-11 · A-44-11 ~I Z! Z4 12 O A-I1-12 u, 13 W., S.M. 12 ADL 18754 ~ A-23-12 13 ~ A-11- 13 ADL 18756 LOCATION OF CONDUCTOR ~.6, LEG # 2 PUBLIC LAND LOCATION OF PRODUCING DESCRIPTION ZONE WELL A-44- CONDUCTO,~ ]6, LEG No2 LOCATED SS ]70' AND 57.42 FROM CENTER OF LEO No ~ E C E IV E D 380'N AND 770'W FROM THE SE COR. CENTER LEG No I LOCATED 1627' N AND OF SEC. !1 T8N RI3W, S.M. 4~s' w ,~,oM ~m s~ con. o~ s~c ~ ~U~ ~ ~ 1~5. ' ' ~., n~zw, s.~. .Y SHELL OIL COMPANY ~T~ =~ ~UN= ~7 Z- 21- 67411 LOCATION OF SHELL-ATLANTIC-STANDARD WELL A-44-11 IN SEC. 11 T. 8N., R.13W., S.M.- COOK INLET - STATE OF ALASKA Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file, To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX, No special effort has been made to chronologically organize this category of information. MIDDLE GROUND SHOAL FIELD SCHEMATIC W-ELL BORE? DIAGRAM PROPOSED LEASE LIN E W E L L EXHIBIT CEMENT FILLUP TO 5000' 6400' ~ " ' PERFS. 6750 7575' All depths are based MGS store 17595 WELL N-~ 4 9215' Csg. ~) 7350' 7" C sg. to T.D. - -- - 7~ 000' ~echon ~r~ 7'/3 17585 G D I7585I 1~/~// Ng 8~ D G T~ Exh/6ih 3 Mi:lc~lb Zround ,.~hoal ~'eld ~cole; /" -- ~00'