Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout162-022_BLM Coastal Oil & Gas Corp. Coastal Towers 9 Greenway Plaza, Suite 480 Houston, Texas 77046-0995 Attention: Mr. Rodney Cox May 31, 1990 Dear Mr. Cox, Enclosed, as per your request on 5/31/90, are copies of the well file information for the folowing wells: A-024916 Malaspina #1 A-024916 Malaspina #l-A A-025270 Core Hole #2 A-032319 Core Hole #4 please contact Jan Hopster at (907) 271-3114, if you have any questions pertaining to this information. Sincerely, Joseph A. Dygas Chief, Branch of Lease Operations Attachment(s) 4 Malaspina #1 Malaspina #l-A Core Hole #2 Core Hole #4 (22 pp) (41 pp) (31 pp) (40 pp) bcc: Malaspina #1 well file Malaspina #l-a well file Core Hole #2 well file Core Hole #4 well file 984:Hopster:jh:5/31!90:cox '" '.. '~~OLOJ:~.ADQ OJrL A.ND G.AS CO:L.c:,)?OJ3,A.."JL"JrO~T DENVER CLUB BUILDING · DENVER. COLORADO 80201 i,'O) ~ @[¡;O\Jß.rrr'·····¿Á!/-A- :~ ~ ~~~~~ OCT 18 IS11 Consr.rvaUrm Division :l.S. CJ:OLOGICAL SUHVE~ AucllOrage. Alaska October 15, 1971 United States Department of the Interior Geological Survey P. O. Box 259 Anchorage, Alaska 99510 Attn: Mr. Rodney A. Smith Oil and Gas Supervisor Alaska Region Gentlemen: Ô) We have mailed logs, dipmeters, DST records and core analyses as requested in your letter of October 4, 1971. Those items which you requested and which we did not forward were not run on those wells, and therefore are not available. We have stamped this material "Confidential" as these items are not customarily released to the public. This data was secured with a great deal of time and expense and we and our partners regard it as proprietory information. We would appreciate it if you could keep this for the sole use of the Geological Survey. Very truly yours, Mii1""~/'!=?:'-'- ./ . H. R. WingÙter Area Exploration Manager RRW:nr ~.,~~ I~~ ~ COLOB..A.· .> OJr::lt.. ~rn-J.'[) G;-.âS C R.POR,..A.. T:EOm- DENVER CLUB BUILDING · DENVER. COLORADO 80201 October ~~9~@ßnWill! ~ot1 15 1911 U. S. Department of the Interior Geological Survey P. O. Box 259 Anchorage, Alaska 99510 c.OO5ervation Divisiòn .' U.S. GEOLOGICAL SUìWE): Anchorage, Alaska Attn: Mr. Rodney A. Smith Oil and Gas Supervisor Alaska Region Gentlemen: Copies of logs and reports. listed below, have been sent to you under separate cover this date. {M~ina Unit II1-A Sec. 31, Twp. 24 South, Rge. 32 East, CRM Dipmeter and Sonic . i Yakutat III Sec. 33, Twp. 24 South, Rge. 34 East, CRM Core Analyses and Dipmeter Yakutat 112 (l-A) Sec. 1, Twp. 28 South, Rge. 34 East, CRM Core Analyses, rES and Dipmeter Yakutat If3 Sec. 3, Twp. 28 South, Rge. 34 East, CRM Core Analyses, Dipmeter, DST Core Ho Ie If2 Sec. 28, Twp. 27 South, Rge. 35 East, CRN Dipmeter, Sonic Core Ho Ie If3 Sec. 6, Twp. 31 South, Rge. 39 East, CRN Dipmeter and Sonic Core 110 Ie If4 Sec. 27, Twp. 32 South, Rge. 41 East, CRN Dipmeter and Sonic Dangerous River #1 Sec. 17, Twp. 29 South, Rge. 32 East, CRN Core Analyses, Dipmeter and DST Very truly yours, /;l4&¿ ê'¿'Z:~ ~., H. R. Wingerter Area Exploration Manager / >-- P. O. Box 259 Anchoragc. AIDska 99510 Colorado Oil and G~5 Corporation 1000 Denver Club Building Denver. Colorado 80202 Attention: Mr~ J. R. Coleman Gentlemen: October 4. 1971 <.' ~.'t ~ .~,.... In checking our records ve find that we never received cert~in logs and information for veIls drilled in Alaska by Colorado Oil and Gas Corporntlon. Specifically "',C need logs nod reports tiS sho~.'!1 beloH. Well C>re IES Dipr:leter 0;< ~!.x.~.£E. ---- t:...ø"""' . -~~:~~,4 !1alaspina UnJ.t fl-A r~c.. ':-~èv/ ,.Cr.,:L",'" ¡: . ........... l ~ ·x rz:,,~.' Sec. 31. 'f. 24 S.,R.32 E. ,1 X --',~,>:."::'\""". ~kutat [:1. Sec. 33, M/ Ci"¡! ,t:'ll~..A.:~~ x7 X G>-:;z~"- T 24 S 3! ,r ¿~~..r.".;l\.... ... . 'J R. I E. I J ' t~(\kutat ïf2(A-l), Sec. 1. ·x"'/ X ~ . X to/' T. 28 S.. R. 34 E. / /' /' ~.J>.;} . ,.~r . f t " X '-. ---; ;)s.í J.></., ~;ø"Y81~lIt¿Jt [<3, Sec. 3, t\.t" CT~'i:;'~ Y,! c~.c.., ~ 1'. 28 S.. R. 34 E. ~ .-).ç,lv-"~·¿·~:4 {,;~_ ,/.' . "jt:'" ". .,I"~ ..-<" . .If .~. i iirtv'{ 'I" X"Y' : Core Hole iiI, Sec.20, T. 27 S., R.35 E. ~ore Hole t-2, Sec.28 T. 29 S.. R. 36 E. X ~Corc Rolò ~3, Sec. 6. 1'. 31 S.. R. 39 E. ~ore lIö1e fJ4. Sec. 27, T. 32 S'J R. 41 E. br,'/ . V~ngerous River ~lJ Sec. 17, T. 29 S., R. 32 E. x x x/ Sonic Other -- ~- X.~ Temp. X Velocity X·~ .,..-- DS T t'7-rØ X. X~ X~ X/ Xe/ X/ X/ -, ; xi/' DST 1/ .. to,""'," . .:'-;- " " )'-':! ~ ::' .,......- . ;. :'. " :... ~ .~_~_......M' _" ~.-...,- Please furnish one copy of the logs and geologic information requeÐted above 8S soon 85 possible. ~. Sincerely yours. (Orig. Sgà.) RODNEY A. SMITH cc: .~ \ole 11 Above Rodney A. Smi th Oil &. G<.\s Supervisor Alaska Region (~----_... """"" Chron.File RASmith:ps:lO/4/71 #^J I >J fi . t! !\ /'i ¡ \ J- t. \\., Files ..J AugUGt 14, 1963 ~ \i H. J. Linton Field Inspection An inopecHon of the follm11ng well sites '-]11S made August 4, 1963. The status of each £0110'.73: Uhite River Unit :{;:3, Bl' F.....'{ploration, A-01GOOl, 1m}. section 29, T. 21 S., R. 19 E., C~lJ. Thi::> holG bw been properly pln2;gC'.d ¿met abandoned ,.¡i-th marker installed. Clc¿m-up npprovi;d. ECJui.pn:c~nt on b~nch for barging to Y[l::~\.ltat. l·L:1laspina 1-/\, Colo":ado Oil llnd Gns Cr.)rl~or.<ttion, A-021~916, w::::; section 31, T. 24 s., t::~-._-"'-_.'_. ,.----~.--...... R. 32 E., CIJl:--'rh:Ls hole ab".n¿om~d e:~'.:2.pt: for sm.'face plug and instalh:tion of mT;n:ker. Rig ovar hole, c¡;,mp 2.ad Cflt_dpL'.ent on location. G"!D.'?:rnl clean-up neec!ccl after rCElo"'Jnl of c.qu;~pG;3n.t. Colo1>-~.do i:{~.ViSC3 tlu~yt j.l1tencl to E10\((~ out (;·~1;.1irnlr:}nt and clc[,;1-uP 10c[1U.0:1 npon co;,;plcti.on ()f Uhite Ri.ver e'1uir~':2.nt ",uv-c. \ ' ..1 ¡ .. li. J. I..5.11ton cJ vn1ite Rive1.< :fl'3 HIe Malaspina I-A file "_....-I...:~. 1< () 'I , .~......'....":";;.".....,; ''''.J"' l' -..... ~ .'-, ...-." ..."'"'....~"..-..,-c~".,....r,,"".- ..~,.- ¡',' ~("" 1 ~,~_ '--', -' '..~ ~. .-'" ~..f r~ -,' ,- Fonn 9-593 (AprH 1952) UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY CONSERVATION DIVISION BeG. 31 --.---------..-----, "'. -->-- , , ~ I : \,. _~ _ _ ,..: ______:. ___ __i!~ ____ , , ' , , ' , , ' I I : --- ---:-----.:--- -- r-- -- , , , , , , , , , -- --.1-----·~, - ----:.- - - -. , , , , , , , , , : I ! T. nn_________?:!LJL 32 g R. ______.___n_u______h_._ INDIVIDUAL WELL RECORD C02P~!~_..l~_t"_~}:·____ Iv1er. PUBLIC LAND: Date__________1g.::J;!.::~_L_____ _.___ .__ Ref. No. ____n__m_mn_ Land office _h____________.8,l1chorage ------------ State _____________.!11~~J~~_______________n___________._____. Serial N o. --________________J~2_41J-J2_____________________ County _________X.§'kºt.-ª!.__~Œ§§_t_________________________ Lessee ____________ThÜQ_J1"-_B~,'2_1;_______n________________. Fi eld _________________mt:'lflL?.(?_¡;ÜDÆ1c__UnL!;____________________ Operator ________Cola.r:.arl_Q___QiL.&..__GBß...-C.Q.L_______ District __n___....11...W_kEJ\.e.gJ.rilL_________________n__ Well No. ______J'1-ªJªQ2_tD-ª_.it_t:A_____:~n___m__n______ Subdivision ________~~t~};mH~Hf~~;___n________________n__n____ Locati on ____n__~_{!.?_C___~~_~___~~~~~~~~__~:~_~_~_~~__Li~~::__~~::~__~~:~__!~ ~~___E~~~__~~~~~_n~j=!2!: __:? :~n~::~_~ ::5!_r:_______ Drilling approved ______.J~2~~__L________n___' 19__S?_~__ Wel1 elevation _____~!.!-_~_~_}}c~~_u____________________________ feet J 12 62 13 C)2':> Drilling commenced ____~!!~____________________, 19___..:'__ Total depth _________J'..-!.__-:!__________m_____________n___n feet Drilling ceased ___m_n__º~.!:_!.___~lL____________, 19___~3__ Initial production _________________________n___________ Plugged & Abandoned @:empî~å :f.t>f':pl'Ðå BcMan ___"Oct___l2_____, 19___62.. G ra vity A. P. I. _____________________________________________ Abandonment approved ___m_um__________. 19________ Initial R. P. ______m______________n_______________________. Geologic Formations (1, ; " ¡-. Productive Horizons Surface Lowest tested Name .Depths Contents ____~~~~~_~E~!~~~y__ .________1:~I.!:_~£fY_ ('?) ___________________n_________m -------------------------- -----------------------~ WELL STATUS -------------------------------------- ---_..-------------------_.. -------------------~ -..----- YEAR JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. Nov. DEC. -- 1)62 ___m_____ _n__._____ ___!?E}:~ _!2~}rL _~!:}fL _.!?E_~ß__ _!~!~:L___ ___________ mn____n ~_._------------- ----------- --~-------- ----------- ________________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ __________w _~_________ ___________ ___________ ------- --------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- -------~--- ----------- -. ---..----- ~--------------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ---------------- ----------- .-----------. -------.--- ----------- --- -------- -----~----- ----------- ----------- ----------- ----------- ----------- ----------- REMARKS __~~__f'.m·:fª£.~__£.9_g..---£.º11ªP..$-ª!LQlLQ1;:~lg....-J1Qle--.::-_l'&A.____m____m___m_m__________m________________ ____L~t;_ __ _ç_ ç. _ ß~ _ _6_L!___TtJ..L15_CL_$J-'._______________n_n_________________n_____n______________________ _____________ ____ _____ _.___ _ __ _____________ ___JJ___3L8.~'_ __ç_ç__Sil__17_0_a!___ylL5.Q.I__~.x~__.9___íi.B~~__cc_.@__B22f!__1dJ25__.sx-___ ________ ____ ____________ _____ ___.___u. ___ ---------------------------------------------------------------------------------------------------------------------------------------------------------------- _________________________________w_________________________________________________________________...__________...________________________________________________ ------------------------------ ---- --------------------------------- --------------------...-----------------------..--------------------------------------- U. S. GOYERNMENT PRINTING OFFICE 16-38067--4 Completion sheet Form 0-G03 (AprillU;J2) UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGKAL SURVEY CGNSERV A TION DIVISION Sec. 31 ------------.--- I ' , . : : ! , , :x "_ ~ __ .:.____.:...._... __f: __ _ __ · , . , . ' · , . f , : ----- :.w_.._:_____ r---- · , , , , , , , , . ---_. :--'---~. -- ..--}--- - ~ , . , ¡ i i '1'. _____________~fL_~._. _w R' 32 E . ---------.._-~-- Ii\"TIIVIDUAL \VELL RECORD C02P~?;__B-_;~_çx_____ Mer. PUBLIC LiI..ND: Da. to____J._4.:-_lJ.::2.L__.:......-- Roí. No. __u_________ Land office _________Anchorage State Alaska ------- ---- Serial No. ___ 024916 County Yab¿tat Lrea Lessee ___n___ Thi] Q X__~.s..t__ Field ______jlªÜt$.l1in_ª.__Uni.t Operator __Colorado QiL~.--C.o. District ____Alß..s..kaJ:..e.gio.n.-________________ Well N o. ______H?:J-ª~2_t.D_ª_.1tJ_:A.___!:___u____________ Subdivision ______~~i~!f~~£1!':;i4___________________________ Locati n 1027' ft. from North line and 330 ft. £rom East line of Section o ___________________n______________________________________________________ _____ _ ____________ _ _ _____________ ______________________________._ DriJIing approved ___.J:un~ 7 , 19~~_. Well elevation ~!!:.~6 DF __________ feet Drí1Iing com:¡neaced __.J..~~e I 2______. 19_~?_ Total depth _-ÊÆ2-_________-"__ feet \. Dl'i1ling ceased ______.9~J:_!_lJ...L___, 19..É.?_. Initial production __ Plugged 6: Abandoned €Ðj-¡:iiJ1~té)cl::fvì.'Yiwi:1\;H0n---Oc.t....-22.-, HL.62.. Gravity A. P. 1. _____ --- /I Abandonment approved ___________, 19___ Initial R. P. ________ ;' ., ".' , (: ( Geologic Fornwtions ' ' " "'.' t ,\ ,........- -.. '-- Productive HodzODS Surface Lowest tested Namc .Depths --- Contents _.lli!~~_~fIl~£:C ,______:K~E!:_~~!Y-_ (?) _______._"__________.________ ------------------------ ----------------- WELL STA'I'tJS -----------------...---..------------- .._-..._-----.....----------...-..... ------------ YEAR JAN. FED. MAR. ApR. MAY JUNE JULY AUG. SEPT. I OC'l'. Nov. DEC. -- __~_?_~_~_____ ___._______ ______m__ ___________ ____.m__ ._m______ .__P-E~~ _P-E~~L .!2E~1L _P-L~JL _!:!?_~____ _________h .__________ ----------..---- ----------- .......-----..-- ----------- ----------- ...--------- ----------.. -----..----- ----------- ----------- ----------- ..---.._-..--- ---------- ...__w___ _________ w_________.. ________...__ __________ ___________ _.._________ ___...______... _____..._____ ___________ __________~ ___________ ___________ _. ..._______.. -------...-------- ----------- _..--------- ----------- ------....--- ---------_. ----------~ ----------- ----------- ----------- -------..--- ----------- --------- ..--------------- ----------- .----------- ----------- ----------- ----------- ----------- ----~------ ----------. ----------- ----------- ----------- ---------- .......-/J RE i.\ fA RKS _ _ ::_ _ S_ 'l r.f?< ç;.,~__£9.g .1___£ Ql;. ~~J.$~d__Qn_...Ql:ig:"_- _ hole_ _":__1'&\___ _u___ _..______.._ ______u____._________________ ____ ___J_$_~'___ç.ç_.@..9_1~___\:U_15_Qn$J:C_______________________________________n____________________________________u____n_________________ ____l.3_~..31. 3.'.'... c_c__@__1.7.0_Q!..__i:z1.5_ QL_ S.l~ ,___5L5L.8 ~~__c.c.__@__8 29'ú'_>.¡J..3 2 5 __S x....u_________._______ _______ _____ __ ._n________ --------------------------------------------------..--------------------..--------------------..-----------------------------------------------_...------------- ------------------------..-------------------...------...-...---------..-------------------------------------...--..------------------------------------------------ --------------------...-.. --.....-----.......-----......-----..-..----..------...------------------------------------------------...----------...--- .. t. IoOYU:H"uf "MINTlNG O,.."C€ IG--3ð06T-.( Completion S;,eet Form 9-330 -¡]J \1ì.: L" ,.. [I ~'J L_, ,,-' d f] 1[. r" II I,) if' Ii,!, l." r \ \ 1 I i) ) J approved, .L.~"get Bureau No. 42-R355.4. An (~b()rH¡;~~ U. S. LAND OFFICJ.IÍJ;'.2Ì.l~ì.1!;L_~________.____ SERIAL N UMBER ---..---.-----.n.--.i.~1'reë LEASE OR PERMIT TO PROSPECT ----__.._ :of, rlOV ~.~ 19()2 ,", \. .n' " . ':¡I."f·,\ :~.lJ ll\71~Y LT, ('I' i\lIC¡~,~L ,~.>_\ i\1:t.-:k:1. --- C' \ ¡ ; 1"1 \ ~1. 1-.-,... UNITED STATES i--··""'''-' ""-~'m____....","" ....'.".-....--.\ ! ( ) T F n ¡ (DEPARTMENT OF THE INTERIO~ . J .' G~OLOGICAL SURVEY ¡ N'JV ", I , .\1, n. S'''iS/['i' F. n ¡:; fl/', ~'--~-'-'-" ,.-".,,~.~... ".'.".". LOG OF OIL OR GAS WELL LOCATE WELL CORRECTLY Gt)lo"t"a:'Ì(,) Oil o.nd G¡;;\}; ç')rJ~;ê.n:a,t Vm HX)O l)Ðnv~:r (;1';(: 1};...dJd:lng.. Üe]jv~:,r, CoIn. Company __.. _ __ _ _____ _._ .__ ..n_____n._ ____.__._n_ ______ ..____..._ Address _ _ _..... ._ _ ___ n _ _._.___n_______n...__U____._._..___________ L . ··..·T·.... tr. ß. A. " M1'}.1~,i:'¡.;Jna ^"~wl'y. essOl or ract ____n______________n_.n________________.__..___ FIeld ________n_n___n_n____._ State ___n___.n....____.__..u .1 "A" 'n ~{h.~~ '32E~ . . rH vex' Yo.\nltat 'rULaf<~ Well No. -.:--________ Sec. ~-::.____ 'f. :~____ R. '~n__' MendIan _____n___________________. County --------------------.-.-------r- Loe!1tion~~~'~~__.__ ft. {SR. ¡of _!L_. Line andl_~~~ ft. {mW' } of n~__ Line of !~~~_~~~~~~.l---:~~-----n--- Elevation ~~~::.~__ . . . (Derrick Roor tebUve to Be'" level) The information given herewith is a complete and correJt eco. ~r)t~' II and all work done thereon so far as can be determined from aU available records., V. S'y,) .. ,. ~~._.... IgncL -h:T~'Þ---~' c, ~'~iï:\. .__n____~-----n--u-------.----..-.-n..--.---. ~> It .,.~. _.h_~ "'/~~- ,"- 'Vl,c~-:.Pr~G1 iJl~Lt, J}~.-11.~ 1n1;" l¥lxjtt{rki:f~r.t- J}:- -Ei5g'tcf~"''¡ 'Ht~-- -.- -.--- The summary on this page is for the condition of the well at above date. .,~. ,~~ '.) (.-.?- .. .tI:1'~'."J:1"i~ ) ',~~ . . _ _.. C"i",.,~-~'''''''';'~'l¡ t·~. - ~.' Commenced dnllmg _____.__:~_~.~:n.:~__.___________, 19______ FInIshed dnllmg _____________._____________________., 1 g__.___ Date _ _~~::'_'::~~~~~~!~_j~:_'___~:t~~~_ ___ _ __ _ ______ ____ OIL OR GAS SANDS OR ZONES (Denote gas by G) No.1, from _____n_.________ .__n__ to ____.._n_.____.__._.n_ No.4, froI11 _n_.h_____________u__ to ____n.n..____'_..___n._._ No.2, from _______n_.____..___.___ to __n_._______.,,_______. No.5, from nh._____n__._____u_. to _n__.___n____n___..____ No.3, from n____________..____.___ to ._n________.__.________ No.6, from ___n_______._______n__ to n_n___._________._u___.. IMPORTANT WATER SANDS No.1, from c.X;~~·~__.n________n. t.o .___)~~~n______._____ No.3, from .______.____________.u. to _m______________n_._n. '~y; hl'i ltjnì No.2, from __.::'___~n..._____._____ to __n_.___:__._._.___.___ No.4, from n___n~.n:_~__________ to ______~____________"'_____ CASING RECORD -_._----~---_._--~_.._--,-------~~------- __.__~___.______..____n......_.~·.___·_______·_~_~.._··.._______.....__.______.___.__._ - -- -----~- SIze Weight casing per h>ot Threads pCI' Inch IIfake Amount Perforated fUnd of shoe Cut and pulled from ~. From- To- Purpose ~·;:'~¡~1; .--t~~~;~2-~. ~-r';r-~!~~~:(;~~'~'f, ;~~:\'C~~_: 1~fð/~~(Ec- lY¡~Jii~k~~~h{~~~I,~~~r~F~~·W~~l :~:~!,:~.-~~t~~'~'¡i~l0~: ~~r;~~' t _ -.3l-,,--" ____W"__;____,. ,-...~~-...-:1i.;+ ~"'.--t~4r'iì4L· -t'::~:J.--,,-.UJ- ·--~·t"--i-.-·-.....- ----"··--·>t-..~n<'_..'"." -..~-.---Lf1?;t --c.-cc-Y--- ¡+-~.::¡/·Z-"-.,j;"*'1 t ::::~¡lß:i J!-.i,,_5_~:_:_ ::~l:f}i~~~\___~~~;: ~~~~"I~~Ji:l'lJd.~t~c:t::'1 :~~~_-,!!.i1{J!!ªè~ __!d~~L~_~'i_,~_E~~E~ ~l~._:-'u~t~~~J,L~:L~:,~~~I'!~':~~' r~ .tf.) ~~~~~~~~~ ~ ~~::: ~~~~~~] ~.~~.~~~~~~~~ ~~~:~~~~~ ~~~~~Ï~~~~~~ :~~~'~~~:'~~~~~~~~::~:~~~::~~~~~~: ~~~~:~:~~:~~~:~:~~~:~~:~:. ~ ~~.~.~~~~~ ~~~~: I :~~~:~~~~:~: ::~ ~:::~:~~~~~:~:: . --_..-- ,-...---------..--....-..----------.- -.---..- MUDDING AND CEMENTING RECORD . I , Size' i.. casing Where set Number sa~...s of cement ~ ! - " t'. i ,,,. I. nt.l} .' ...t 11 (' p-!-p. I. 'J!\ ~ ¡~~3i: ::l~j~!!·:::. :..::.--::::..~~~'::..:..::..:....... .:.~i.~~~~~:~~-'. ]J:{..~~Z~1_ -:.::_3~~:_...._-...:-__·:..:.... M;ethod used Mud gravity Amount of mud used _________ _ _ __ __ ____... _...:_ __ __ __ _ _ _,_______ ___ ___ ___ _ _..i_ __ __ _______________ _____ __.1_____________ _____ ____...._ ___ __... ._.__ __ ______... _ ____ ______... ___ __ _________...... ____... _ _ __ ___ __ ~... a PLUGS AND ADAPTERS ~ Heaving plug-TMaterial ______n__..1I' ---_,,___.___.___ Le4gth __,,"".___._n___.________. Depth set ________._nnh_nn__._._ , , Adapters- TvI ateriaL __.___ _.._ ___ _ __ __~ _.____nn._.___. Size _____.____ __n__ .__.__ ______ _ __ _._ _._ ___ _ __ ___ __ _______ ___ _.__.n _._._ __. . ' SHOOTING RECORD Size foheU u8ed J<)xp D81ve used - Qul;~~~;ccc,- Date Depth shot Depth cleaned out ~_;:;:::::'=:::::::=-==:1===::-=--==-":::===:~_.--- ---- ~~:~~~__ ______ ___h_ ________________ ___________h______ ________n___ ___n___. n__n___ _ ____n_h_ _ n____________ _____ _ _n_ n__n__ h_ ____ __ __ ____n_ 'n_ n_ _______ __~~____________ ______ ._______________ _________..~_ ____~_____________~ ______._4 ___._____ _ ___________ _________________~______ ___________________.___~__________~__~__ --------- ----- -- .. ----- . --------------- ----------. ------------~--- ----- --.. -- ¥_... ---- ----- .. ~--------_.. ----------. -- ---------- - -- --------------------------------- --~-- --- TOOLS USED Hotary tools wlcre used from __.0___________00 feet to lJ,ß2.3.---- feet, and from _____,___h_____ feot to m~h..n_ feet Cable tools wefe used from ____~D_"!._______m__ feet to __ .f)_"!________ feet, and from __.IOtO....h_____ feet to _..11._____ feet DATES _____m__m _______ __n__________________, ~ 9______ Put to producing rM.h-t~t()b.fð.J.."--~~h--n-----' 19-6.2_ The prodl ction for the first 24 hours was -...0....------ barrels of fluid of which..()__n_ % was oil; -0---- % emulsion; _____.:% water; and m___ % sediment. Gravity, °Bé. h__________________________________ If gas wer, cu. It. per 24 hours ____~Q~______.____ Gallons gasoline per 1,000 cu. ft. of gas h__h____________ Rock pressure, lbs. per sq. ir. __00_____00__________._ EMPLOYEES <'tJ.U~fltl1ß_ _ __ _ __ _ __ ____ ___ 00_ n_h_ 00_______ __, D rineI' _____.____________.. __.____ ____ ___ ___ __ ___ ___ __ _ ___ _ _, Drill or W~L'I_t·______..______. _____________________.___. _______, DriJlel' ________________________________u____nu_________, Driller FORMATION RECORD -~-~- ----- --- FItOJII- TO- 'fOTAL FEWI' FORMATION -------.--- --.--,. --'--.--'-' -"'-._---- .. -0- '('00 'tOO '7f){) ·%50 '1iJ50 iJ~,50 .13,U23 ~;:rr3 Surface tIIQ,nd and grave,) Mud(.;t.cn~ and. ccuf'"lorr1t!rut Le fileqlH~nce B 11 tv, t,QUE', uanù.ð tone f1!\d C'..n1 gloT:!f!.rt!, I; lc NOTES A ("etaJ.led :f'ðlTØl!\t ton r~or'(l to(U.~. be forwarded un~~r ~¡:~p~rl\te eO\'er ~s soon Ð.ß it 15 aomplflteil. F,toß~___l__ ¡ ¡ FORMATION R~~HRD-Conl:inued ---..r-----.----~--- ¡--- TO- I TOT AL FIŒT r------- : I . \ I \ \1'.. ·'·~1)¡n·'! __~_=___~__.~_-i FORJlIATlON -.--------.----- _L~~...__._~_~_L-,--,---,_"._~__."__,+~I~__~ --". .~..--_._'----~'----'--'- .-6_. _..___..___.._..__._._ I-IIS)'ORY OF OIL OR GAS WELL IG--430\ ' ·2 U. s. f;:>VF.RNMr:.HT .PR'NUHG orFICE I It js of the grcntct!t jlll lOr/.ollce (olu\Vc n cOIl1 ,lete hisl.ory of Ihe well. I'lcase stlllc jn del~iI the dates of redril/ing, (ogcth(~r ·wHIt the reasòns for Iho worlr "lid itl! î'csllhs. .]f thHe were'ålJY thn"l(eS inude in the cm;inlt; slate fuHr, nnd if Il.Ily ,ènsihg ;vlwr; "sidetràcked'; or Jeft ¡tllhe well, give its size and location. If the ,~cllltns been dynamited, g¡I(~ dale, size, !,osHi"n! nlld JlUmber" of shots. H !,hlgs or bddgrs were pul ih ('( {est for ti'nter, s!a(c'ldlld of moterial used, "osition,aml n~slll!~; of IJlltnpiUff or bal/lnEt. --~""'__"--'iO'_" _...;.,." NOTED MALASPINA UNIT NO. l-A Icy Bay-Cape Fairweather Area NOV G 1962 M. ll. Soyster Weekly Report of D::r;-illing Progress for the Period June 11::. 17 6-11 Rigging up. Drilled rathole. 6-12 Spudded in at 8:36 A.M. and drilled 12t" hole to 63' KB. Opened 12t" hole to 22" and set 2 joints of 18" ID slip joint conductor pipe at 61.43' KB. Cementreturn;ed tçr surface. woe. B\li1ding rig house. 6-13 woe. Building celJ..ar and rigging flow line. Ran in hole. Top of cement is at 55' KB. woe and waiting to hear from Foss barge which has casing and cement on board. 6-14 Drilled out of conductor pipe with ;t2t" rock bit at 8:30 P.M. Firm. cement from 55' to 65'. Building rig house. Started unloading Foss barge over dock at 8:30 A.M. 6-15 Drilled 12t" hole from 177' to 775'. Mud wt 10.5, vis 120. Dev zero degree 20 min at 489'. Zero degree 40 min at 682. Bit #1 12t" Smith DDT GL - 489' (489'). Bit =/þ. 12t" 8mi th DIJr 489 - 682 (193'). Lost one system of mud between 480 - 550'. 6-16 Drilled 12k" hole from. 775' to 1730'. Mud wt 11.1, vis 120. Dev zero degrees 20 min at 1246'. Bit #3 12k" Smith K2P 682 - 1246' in 12 brs. Bit#4 12k" Smith K2P 1246 -1730' in 10 bra. Bit #5 Sec. s-6 1730 - 1808' (TD) in 3 brs. No further 10s6 o;f'mud. 6-17 6:00 A.M. Circ hole prior to pulling out to open 12k" hole to 17-!". NOTE: Finished unloading Foss barge at 7:00 P.M. Saturday, June 16. June 27, 1962 fi£lClnrlJD) NO\! '6 1962 U.s. GEOLOGICAL SURVEY An !hoT.:II!1.~, AIA\.fk$ MALASPINA UNIT NO. l-A Icy Bay~Cape Fairweather Area Weekly Report o~ Prilling Progress ~or the Period June 17 - 23 6-17 TD 1808 in 12&" hole. Opened 12&" hole to 17~" from 63' to 640'. Mud wt 11.8, vis 70. Lost one hal~ tank system of mud at interval 480 - 550. 6-18 Opened 12t" hole to 17~" from 640 to 1655'. Mud wt 11.9, vis 67 . 6-19 Opened 12&" hole to 17~" ~rom 1655 to 1657. Mud wt 12, vis 72. While opening hole at 1657 (1:30 A.M.) the hole caved in sticking hole opener. Circulated and worked stuck pipe.. Pulled 200,000# but could not work pipe loose. Good circulation thruout. Called Schlumberger and Ford- Alexander ~rom Anchorage Who arrived at rigsite at 5:00 P.M. Ran F-A freepoint indicator which showed that hole opener bit only was stuck. Ran string-shot and backed off 7 3/4" drill collars at 1620' which left hole opener and one drill collar in hole. Started making up~ishing tools. 6-20 Jarred fish loose and recovered same. Had to cut overshot bowl off of fish due to broken grapple inside. Cleaned out hole to 1715' using 12k" bit. Opened J.2t" hole ~rom 1655 to 1701 at which point hole opener b~- came stuck. Pulled loose at 150 000#. Pulled out of hole and made up drilling string consisting o~ 17!" hole opener, 17~" 3-point reamer, jars and S-W bumper sub and reamed hole to 1560'. 6-21 Reamed hole from 1560 to 1699'. Circulated hole clean. Ran 55 jts (1704.53') 13 3/8" 4&/1= H-40 R-2 SS casing with combination float and guide shoe, float collar and one centralizer. Cemented with 507 sacks of connnon cement. No additives. Casing set at 1700' KB. Bumped plug with 1150 psi then bled of~ to zero psi. Cemented outside of 13 3/8" casing from bottom of 18" ID conductor pipe to GL using 60 sacks cament and one sack of CaCl 2. Cement returned. Finished cementing at 1: 31 P.M. woe. 6-22 woe. Slacked o~f on casing at 1:30 P.M. Cleanup. 6-23 woe. Nippling up.. Welded on head.. Working on BOPs" June 26, 1962 MAlASPINA UNIT NO. I-A ley Bay-Cape :F'airweather Area Weekly Report of Drilling Progress for the period June 24 - 29 6-24 Removed landing head and re-welded same. Tested welds to 2500 psi for 30 minutes. No leaks. Landed BOPs. Repairing Hydril BOP. 6-25 Höoked up BOPs, flow line and repaired mud mixer. Breaking down fishing tools. Tested all BOPs to 1000 psi for 15 minutes. All tests OK. Drld out plug and shoe at 1700'. Cleaned out to 1802' ('I'D) and resumed drilling 12-k" hole to 1940'. Bit #6 12k" See S-3 Used as pilot bit on hole opener Bit Ir 12t-" See S-3 Used. as pilot bit on hole opener Bit #8 12å-" See S-3 Used as pilot bit on hole opener 6-26 Drilled 12å-" hole from 1940' to 2397' (4511). Drift -k degree at 1940'. Drift -k degree at 2209'. Mud wt 11.6, vis 56, WL 8, cake 2/32. Bit #9 12t-" See S-3 Drilled 138' in 6 hrs. Bit #10 12t" See S-3 Drilled 269' in 10 1/2 hrs. Bit #11 12å-" See S-3 Drilled 196' in 10 1/2 hrs. Drilled 12k" hole from 2397' to 2795' (3981) in sand and soft siltstone. Drift zero degrees 5 min at 2873. Mud wt 11.5, ds 56, sand 3~%>, WL 7, eake 2/32, ph 8. Drilling at 3~ min per ft. 6-27 \ Bit #12 CP ES2G Drilled 185' in 9 hrs. B;i:t #J-3 Hughes OSC Drilled 214' in ~ hrs. 6-28 Drilled 12k" hole from 2795' to 3120' (325') in sand and soft siltstone. Drift 1/4 degree at 3120'. Mud. wt 12.1, vis 61, sand 5%>, WL 6, cake 2/32, ph 8. Drilling at 5 min per ft. Bit #14 Hughes OSC Drilled. 106' in 6 brs. Bit #15 Sec. s-6 Drilled. 210' in 8 hrs. 6-29 Drilled 12k" hole from 3120' to 3454' (334') in soft s:iltstone and con- glomerate. Drift zero degrees 10 min at 3454'. Mud. wt 12.3, vis 56, sand 7%>, WL 5.5, cake 2/32, ph 8. Prilling 2~ min per ft. Bit #16 Sec. s-6 Drilled 133' in ~ brs. Bit #17 CP ES2G Drilled 201' in 8 hrs. July 3, 1962 MALASPINA 'UNIT NO.. 1-A. Icy Bay-Cape Fairweath~r Area Weekly Report of Drilling Progress for the Period Jun.e 30 - July 6 6-30 D.rilled 12i-" hole from 3454' to 3666' (212')" Drift 1/4 at 3639'.. Mud wt 12.3, vis 52, WL 6..4, cake 2/32. Bit #18 CP ES2G Bit #19 Smith SV2 Drilled 125' in 6 hours Drilled 60' in 5h~xrB 7 -1 Drilled l2k" hole from 3666' to 4115' (4)+9') in siltstone and sand. Drift 1/4 at 4115'. Mud wt 12,,6, vis 51, sand 8, W16, cake 2132, ph 805.. Bit #20 Bi t #21 Hughes OWS Drilled 94' in 8 hours Smith 8v-2 Drilled 382' :t.n 12 hours 7 -2 Drilled :I2k" hole from 4115' to 4313' (198') in conglomerate and soft siltstone. Mud wt 12..6, vis 53, sand 4, WL 5.5, cake 2/32, ph 8. Bi t #22 CP m2G Drilled 88' in ~hours 7-3 Drilled l2k" hole from .4.313' 'to 4468' (155') in conglomerate and soft siltstone at 7~ min per ft 0 Drift zero degree 5 min at 4345'. Mud 'Wt 12,,8, vis 53, sand 7.5, WL 5.5, cake 2/32, ph 7.6" Bit #23 SEC 8-6 Drilled 142' in 12 hours 7 -4 Drilled l2t" hole fiom 4468' to 4607' (139 ') in soft ail t atone and conglomerate at 4~ min per f't. :Qrift 20 min at 4470' and 20 min at 4607'. Mud wt 13.1, vis 53, sand 5, WL 5.5, cake 2/32, ph 8. ill. t #24 Bit #25 SMITH8V-2 Drilled 126' in ~ hours SEC 8-6 Drilled 61' in 7'2 hours 7-5 Drilled 12-k" hole from 4607' to 4838 (231') in soft siltstone and conglomera te .. Drift 20 min at 4607' and 1/4 at 4800'. Mud 'Wt 13.1, sand 4..5, vis 58, WL 5, cake 2/32, ph 8.5. Bit #268EC 8-3 Bi t #27 CP ES2G Drilled '78 t in 8! hours Drilled 193' in 12 hours 7-6 Drilled. 12-k" hole from 4838' to 4862' (24').. Cored Gk" hole from 4862' to 4872' (10'). Drilled 12k" hole fram. 4872' to 5027' (155'). Core #1 4862-4872" Recovered 6' soft siltstone. Mud wt 13, vis 58, sand 7.5, WL 6, cake 2/32, ph 8.5.. Drilling rate 2~ mJ.n per ft. July 10, 1962 MALASPINA UNIT NO. l-A Icy Bay-Cape Fairweather Area Weekly Report of Drilling Progress for the Period July 7 - 13 7-7 Drilled 12k" hole f'rom. 5027' to 5346' (319') in conglomerate and soft sand- stone at 4 minutes per foot. ~ri~t 10 min at 5175 and 5 min at 5356'. Mud wt 13, vis 56, sand 5, WL 5, cake 2/32, ph 8.2. Bit #28 CP ES2G Bit #29 Sec s-6 Drilled 62' in 7~ hours Drilled 313' in 17 hours 7-8 Drilled l2k" hole f'rom 5346' to 5411' (65') in soft sandstone and conglO!l1er- ate at4 min per foot. Mud wt 12.7, vis 61, sand 4, WL 4.5, cake 2/32, ph 9.5, oil 5%. Bit #31 Sec S-3 Drilled 55' in 7 hours 7-9 Drilled ]2¡}" hole from 5411.' to 5531' (120') in soft sandstone and conglomer- ate at 4 min per foot. Mud wt 13, vis 65, sand 4, WL 5, cake 2/32, ph 9. Bi t #32 Hughes œc I?rilled 120' in 13~ hours 7 -10 Drilled 12i" hole from 5531' to 5692' (161') in soft sandstone and conglom.er- ate at 5 min per foot. Drift 15 min at 5684'. Mud wt 12.7, vis 54, sand 4.5, WL 4.5, cake 2/32, ph 9.5. Bit #33 HughesOSC Drilled 153' in 13~ hours 7-11 Drilled 12i}" hole from. 5692' to 6054J (362') in soft siltstone and sand at 3 min per foot. Drift 3/4 at 6059. Mud wt 12.9, vis 55, sand 4.5, WL 4.3, cake 2/32, ph 9.5. Bit #:)+ Smith 8V2 Bit #35 Smith 8-6 Drilled 99' in 10 hours Drilled 276' in 9 hours 7-12 Drilled l~" hole from. 6054' to 6264' (210') in soft siltstone. Mud wt 12.8, vis 51, sand 4, WL 4.5, cake 2/32, ph 9.4. Bit #36 Sec s-6 Drilled 205' in14,~ hours 7-13 Drilled 12ft-" hole from 6264' to 6365' (101') in soft siltstone and conglom.er- ate. Mud wt 12.9, vis 57, sand 8, WL 4.6, cake 2/32, ph 8. Dr:1.ft 3/4 at 6365. Bit #37 Sec s-6 Drilled 89' in12~ hours Core #2 6264-6276 (Informational) Recovered 8' soft siltstone. July 17, 1962 MALASPINA UNIT NO. .1...A Icy Bay-Cape Fairweather Area Weekly Report of Dr~lling FWogress for the Period July 14 . 20 7 w14 Drilledl2k" hole from. 6365 ~ to 6424' (59') in conglOmerate and sof't siltstone at1B .min par foot. Mud wt 1209, vis 64, sand 5, WI.. 3.8, cake 2/32; ph 9. Drift 1L./2 at 6424. Bit #38 Bit #39 Hughes OSC Sec. M,.;.3 D;J;'illed 10' in 5 hours Drilled 49' in 7 hours 7-15 Drilled 12k" hole from. 6424' to 6469' (45') in aonglomeratè and gand. Mud wt J..2.9, viS 58, sd5, WL 4.), cake 2/32, P:h 9. Pwnp1000 psi, table rpm 50 ~ 200, wt 15;000 ~ 40,000. Bit #40 See M ~ 3 Bi t 1#+1 CP Ef32G Drilled 27' in 6 ho~s ~illed15' in ~ hours 7 -16 Drilled 1'J.t" Þ,ole from. 6469~ to 6550 (81') in soft sandstone and con- glOmerate at 4 min per ft. Mud wt 13, vis 59, sd 6, WL 3.4, cake 2/32, ph 9. Pump 1000 psi, table rpm. 60 - 100, wt 15,000 .. 35,000, Bit #42 Smith c-4 Drilled 7' in 5! hours 7 -17 D¡ri.l1ed 12i-" hole from 6550 to 6717' (167') in soft siltstone and con- gJ.,omerate at 6 min per ft. Mud wt 12.8, viS 65, sd 5, WL 3.6, cake 2/32, ph 9.5. Drift 1/2 at 6717. Bi t 1#+3 Smi th BV2 Bit 1#+4 Smith SV2 Drillèd 77~ in 11 hours Drilled ,167f in lþ hours 7-18 Drilled 1'J.t" h01è from 6717' to 6928~ (ell!) in soft siltstone at 7 min per foot. Mud wt13, vis 60, s4 6, WI.. 3.6J' cake 2/32, ph 9. Drift 1/2 at 6847'. Pump psi 1200~ Rotary ~ 75 - 125, wt15,OOO .. 25,000. Bit 1#+5 See s.~6 Drilled 130' in 13 ho~s 7..19 DX'illed 12k" hole from 69~8' to 7118' (190') in conglœerate ànd soft siltstone. Drift 1/2 at 7060'. Pump psi 1000 - 1200, Rotary rpm 40 - 80 .. 125, wt 15,000 ~ 30,000. Bi t il4'6 Smi th SV2 Drilled 214' in 14 hours 7-20 Drilled 12%-" hole fram. 7118' to 7~11' (93') in conglomerate and soft siltstone at ~ min ~r ft. Mud wt 13, vis 56, sd 5, WL 3.8, cake 2/32, Ph 9. PUmp p~i 1200, Rotary~4Q - 80 - 125, wt 15,000 .. 25,000 - 30,000. Bi t 1#+7 Smi th BV2 Bi t 1#+8 Smi th SV2 .J'lÙ-y 26,1962 Drilled 70' in .~ hours Drilled 80' in 11 hou,rs MAIASPINA UNIT NO. l-A Icy B$y-Cape Fairweather Area Weekly Report of DrillingProgr.essfor the Per;!.odJ:u,ly 21 - 27 7-21 Drilled l2k" hole from 7211 to 7302 (91') in sand and cong1òmerate at 5 min per foot. Drift 50 min at 7302.'. Mud wt 12.8, vis 55, sand 5,5, WL 4.2, cake 2/32, ph 9, Bit #49 HUghes OWS Drilled 91' in 16 hoUJ;'s 7-22. Drilled 1~" hole from 7302 to 7399 (17:.\) in soft silt'stone and conglomer- ate at 6 min per foot. Mud wt 12.7, vis 56, sand 4~5, WL 4, cake 2/32, ph 9. Pump psi 1£00, rotary rpm 125,WOB .15,000 - 25,000. Bit #50 Hughes OW8 Drilled 92' in 12 hOUks Core #3 7302-7307 Rec 51 siltstone andcong1bmerate 7-23 Drilled lEt" hole from 7399 to 7560 (161.1) in SQft siltstone and sand at 2 min per foot. Drift 3/4 at 75601. Mud:wt J..2.8, vis 57, sand 5, WL 3.8, cake 2/32, pb 9. Pump psi 1400, rotäry:RPM lOOJ WOB 15,000 .. 25,000. Bit #51 Bit #52 Sec 8..6 Hugh,es OWS Drilled 681 in 7t hows Drilled 931 in ~ hour.s 7 -24 Drilledl~" hole from 7560 to 7780 (2201) ;i.n sort siltstone and sand at 10 min per foot. Pump psi 1200, rotary rpm 100, WOB15,000 ~ 25,000. Mud wt J..2.6, vis 55, s~nd 6, WL4, cake 2/32, ph 8.5. Changed from 15 7-3/4" drill collars to 9 7-3/4" drill collars Bi t #53 Hughes OWS Drilled 195' in 9! hours 7-25 Drilled 12~" hole from 7780 to 7911 (l~l') in soft Siltstone at4 min per foot. Mud wt l2.9J vis 57, .sand3.5, WL 4.2, cake 2/32, ph 9- Pump psi 1200, rotary ~m 100, WOB10JOOO ~25,OOO. Bit #,;4 s6-J ~rii1ed 103' in 8! hours 7-26 Drilled l2k" hole from 7971 to 8111 (140') in sQft siltstone and QongJ;omer- ate at 9 min per foot. Drift 1/2 at 7984. Mudwt 12.9, vis 62, sand 5, WL 4.3, cake 2/32, ph 9. Pump psi l200J rotary ~pm 100, WOB .10,000 .. 25,000# Bit #'?5 Sec M5 D~i11ed 126' in 13 hours 7..27 Drilled l2k" hole from 8111 to 8235 (124') in aong1àmerate and soft siltstone at 6 min p~r foot. MUd wt 12..7 J vis 60, sand;, WL4.l, cake 2/32, ph 9. Pump psi 1200, rotaryrpmlOO, WOB15,OOO - 25,000. Bit #,?6 B;lt #57 Smi th SV-2 See M5 ~il1ed ,127' in 13 ho~s D,rillèd 124' in 16 hours July 31, 1962 MALASPINA UNIT NO. l~A Icy Bay-Cape FairWeather Area Weekly Report of ~il1ing Progress for the Period July 28 ~ August 3 7~28 Drill~d 12ft" hole from 8235 to 8295 (60') ¡ Core #4 8295-8305 (101). Recov~red lÙ' soft siltstone. Mud wt 12.6, vis 58, sand 4.5, WL 4, cake 2/32; ph 9. Bit #58 See M-5 :prilled 60' in 6~ hours Circulated and conditioned hole to run logs. 7~29 Ran Schlumberger IES,Microlog, Dipmeter, Intergrated Sonic logs and took 23 SidEJwall. cores. Recovered 20 sidewall coreS. 7~30 TD 8295' in 12à-" hole and 8305' in 6è-" hole. While going in hOle with 1~" bit and 3~point reamer pipe became stuck at 7535'. Good èirculation maintained. Could not pull pipe loose. Waiting.on back-off string shot. 7-31 Backed off drill collars and pipe using Bqhlumbérger and Ford~Ale~nder string shot leaving Qit, reamer and bottom collar in hole. 8-1 Got over fish 'With overshot but gJ:'sppJ.e in oversllOt broke. Afterre- placing broken grapple jarred fish loose and pulled out of hole. Con- ditioned hole prior to rupning 9. 5/8" casing" 8-2 Ran 199 joints (8279:067') 9 5/8", 43.5#, A. O. Sroith, S..,95, R-3, T&C caSing w/Baker combination float and ~idé shoe} float collar and 3 centralizerS. Cemented casing with 325 sacks Slo-set cement w/3% gel added. Casing set at 8294.27' KB. Displaced cement in 5~ minutes. Bumped plug to 1.250 pai. Blèd 61'1' to 800 psi~ Finished Job at 5:20 P"M. wac, 8-3 WOC. InStalled new cathead. Working on transmissiön. August 6, 196:3 Mf\J:.AêJ?J~ . ~I'r. NO.. _ I-A Icy Bay~Cape Fairweather Area Weekly Report of Drilling Progress for th¢ Period August 4 - August 10 8-4 Landed 9 5/8" casing~ Layed do>vn 15 7 3/4" drill collars. 8-5 Worked on cathead and derrick lights. Layed down 255 joints of 4 1/2" drill pipe and picked up 140 joints of 3 1/2" drill pipe. Finished standing back 3 1/2" drill pipe. Went in hole with bit, 9 6 1/4" drill collars and drill pipe. Found top of cement at 8248 I. . Drilled out cement plug to 8275'. Cleaned mud pits. 8-6 8-7 Mixed 3 pits of gyp base mud. Tested BOP's to 1000 psi for 15 minutes. Test OK. 8-8 Displaced all old mud. Drilled out shoe and opened core hole from 6 1/4" to 83/4" from 8295' to 8305', Drilled 8 3/4" hole from 83051 to 8358' (233'). Mud: wt. 12.3, vis 44, WL 2.3, PH 8. Pump 1100#, rbtarY75-80 rpm, WOB 8,000#-15,000#. Bit #59 Sec. s-4 Drilled 233' in 17 hours 8-9 Drilled 8 3/4" hole from 85381 to 8637' (99') in siltstone and sand. Mud: wt 12.3, vis 53, sand 1,%, WL 2.7, FC 1/32, PH 8.5, Pump 1200# rotary rpm 75, WOB 12,000#-15,000#. Bit #60 Sec. s-4 Drilled 97' in 12 1/2 hours. 8-10 Drilled 8 3/4" hole from 8637' to 8725' (88') in silstone and shale at 8 minutes per foot. Mud wt. 12.3, vis 52, sand 1.7, WL 2.3, FC 2/32, PH 8. Bit #61 Sec. M4L Drilled 46' in 8 hours. August 13, 1962 MAlASPINA UNI'l' WO. l-A Icy Bay-Cape Fairweather Area Weekly Report of Drilling Progress for the Period. August 11 - 17 8-11 Drilled 8 3/4" hole from 8725' to 882.6' (101') in siltstone at 9 minutes per foot. Mud wt 12.2, vi.s 51, sand 1.2, WL 2.7, cake 2/32, ph 8. Dev 1 degree at 8800'. Pump 1100# - 1200#, RPM 75 - 80, WOB 10,000# - ~5,000#. B:i, t #62 Bit #63 ES2 SV2 Drilled 43' in 8! hours Drilled 80' in 10 hovrsc 8-12 Drilled 8 3/4" hole from 8826' to 8900' (74') in siltstone at 9 minutes per foot. Mud wt 12.4, vis 49, sand 1.6, WL 2.3, cake 2/32, ph 7.5. Pump 1200, RPM 80, WOB 12,000# - 15,000#. Bi t #64 Bi t #65 DT1G M3C Drilled 45' in 6!- hours Drilled 501 in 10 hours 8-13 Drilled 8 3/4" hole from 8900' to 9036' (136') in soft siltstone and sand at 6 minutes per foot. Mud wt 12.5, vis 54, sand 1.5, WL 3, cake 2/32, ph 8. Pump 1200, RPM 75 - 80, WOB10,OOÜ# - 12,000#. Bi t #66 M3C Drilled 115' in 13 hours 8-14 Drilled 8 3/4" hole from 9036' to 9196' (160') in siltstone and sand at 7 minutes per foot. Mud wt 12.4, vis 55, sand 1.8, WL 2.8, cake 2/32, ph 8. Pump 1200#, RPM 75, WOB 10,000# - 15,000#. Bi t #67 DT Drilled 11.2' in 11! hours 8-15 Drilled 8 3/4" hole from 9196' to 9359' (163') in soft s.iltstöne and conglomerate at 5 min.utes per foot. Dri.f't 1 degree at 9252'. Mud wt 12.), vis 46, sand 2, WL 3, cake 2/32, ph 8. Pump 1200#, RPM 75, WOB 10)000# - 12,000#. Bit #68 DT2G Drilled. 125' :i.n 13~ hourB 8..-16 Drilled 8 ·3/4" hole from 9359' to 9453' (9~") in s:i.ltstone and conglomer- ate. Mud wt 12.3.y yis 54, sand. L8.9 WL, 3.2, cake 2/32, ph 8. Pump 1200#, RPM 75 - 80, WOB10,OOO# - 20,000#. Bit #69 Bit #70 DI'2G DT2G Drilled 109' in ~ hours Drilled 92' in 13 hours 8-17 Drilled 8 3/4" hole from 9453' to 9511' (64') in siltstone. Core #6, Gk" from 9517-9521. Recovered 4' of'si1tstone. Mud wt 12.5, vis 60,. sand 2, WL .2.8, cake 2/32, ph 8. Bitl!11 August 21, 1962 M3C Drilled 62' in 11 hours. MALASPINA UNIT NO.1-A Icy Bay-Cape Fairweather Area . . Weekly Report of I.)rilling Pro@::ess for the Pf¡!riod August 18 - 25 8-18 Drilled 8 3/4" hole from 95171 to 9595 (781) in siltstone and conglomerate. Mud wt 12.5, vis 62, sand 2.3, WL 3, cake 2/32, ph 8. Pump 12.00#, RPM 75 - 80, WOB 12,000# - 15,000#. Bit 1/12 ES2 Drilled 74' in 8! ho~s 8-19 Drilled 8 3/4" hole from 9595' to 9668' (73') in siltstone and cong1omeraté at 15 minutes per foot. Mud wt 12.5, vis 59, sand 2.4, WL 2.8, cake 2/32, ph 8. Pump 1200#, RPM 75, WOB 15,000# .¡. 20,000#. Bi t #73 C....2 Drilled 37' in 8 hours 8-20 Drilled 8 3/4" hole from 9668' to 97331 (65') in siltstone and conglomerate at 8 minutes ~r foot. Mug,wt 12.5, vis 63, sand 2.5, WL 2.8, cake 2/32, ph 8. Pump 1200#, RPM 75, WOB 10,000# ,.. 15,000#. Bit 1/14 ßit#75 M3C MH3C Drilled 39' in7 hours Drilled 56' in 11~ hours 8-21 Drilled 8 3/4" hole from 9733' to 9788' (55') in siltstone and conglomerate at 20 minutes per foot. Drift 1/2 degree at 9788'. Mud wt 12.5, vis 61, sand 2.5, WL 3.1, cake 2/32, ph 8. Pump 1200#, RPM 75, WOB 10,000# - 20,000#. Bi t #76 Bit #17 MH3C EH-1 Drilled 25' in 7l hours Drilled 36' in s! hours 8-22 Drilled 8 3/4" hole from 9788' to 9877' (89') in siltstone and conglomerate at 1j minutes per foot. Mud wt 12.3, vis 60, sand 2.6, WL 3.3, cake 2/j2, ph 8, PumplP.OO#, RPM 75 .,.. 80, WOB 10,000# .,;. 15,000#, 12.,000# - 13,000#. Bit #18 EH-2 Drilled 57' in ll~ hours 8-23 D;r.11lèd 8 3/4" holè from 9877' to 9963' (86') in siltstone, sand and conglomer- ate at 10 minutes per foot. Pump 1200#, Raf 75, WOB ],0,000# - l5JOOO#. Bi t #79 Bit #80 MH3 ES-2 Drilled 82' in 1~ hours Drilled 36' in 7~ hours 8-24 Drilled 8 3/4" hole from 9963' to 10,037' in si1tstonè and conglomerate. Mud wt 12.1, vis 65, sand 2.5, WL 2.9, cake 2/32, ph 8.5. Pump 1200, RPM 65 ,.. 75, WOB 10,000# ,.. 15,000#. Bit :/181 MH3 Drilled 27' in 5~ hours 8-25 6:00 A.M. Drilling .atlo,044 in siltstone and conglamerate. Weather CA VU. Temp at rig 36deg F. AUg'USt 28, 1962 MALASPINA UNIT NO. l-A Icy Bay-Cape Fairweather Area Weekly Report of Dri.1ling Progress for the Period August 25 - 31 8-25 Drilled 8 3/4" hole from 10,037' to 10,105' (68') in siltstone and conglomer- ate. M1N. wt 12.3, vis 62, sand 2.5, WI, 2.8, cake 2/32, ph 8.5. Pump 1200#, RPM 75, WOB 15,000#. Bi t #82 Bi t #83 EH3 W-7 Drilled 54' in 9 hours Drilled 61' in 12~ hours 8-26 Drilled 8 3/4" hole from 10,105' to 10,194' (89') in siltstone andconglomer- ate at .5-t mi.nutes per foot. Mud wt 12.2, vis 62, sand 2.8, WL 2.9, cake 2/32, ph 8.5. Pump 1200#, RPM 75, WOB 1.0,000# - 15,000#. Bi t #84 W-7 Drilled 89' in 16 hours 8-27 Drilled 8 3/4" hole from 10,194' to 10,31]' (1191) in siltstone and sand at 7 minutes per foot. Mud wt 1.2.3, vis 61, sand 3, WI, 4, cake 2/32, ph 8.5. Pump 1200#, RPM 75, WOB 10,000# - 15,000#. Bit #85 W-7 Drilled 11.9' in 16-! hours 8-28 Drilled 8 .3/~.11 hole from 10,31.3 to 10, 42~·' (111') in siltstone. Mud wt 12.2, vis 62, san.d 2.5, WI. 2.8, cake 2/32, ph 8.5. Pump 1200#, RPM 75, WOE 15,000#. Bi t #86 MŒ-3 Drilled. 111' in. 13 l'1Ou1.'s Runni.ng Scbl.1.miberger logs at 9:30 P.M. Working on GxR-A pump. SIM 10,023.60' eq:u.als 10,021.201. Di.:f:f. 2.40 I. No correction. 8-·29 Dr:U.1ed 8 3/4" hole from. 10,424.1 to 10,5051 (81') in siltstone and conglomer- ate at. 7 mj.rm.tes per foot. Mudwt 12.1.~ vis 61, sand 3, WI, 3.1, cake 2/3~:, ph 8. Ream.ed Ught hole from 10 J 300' - 10,4·24'. :Finished running Schlumberger logs. PI.Ämp 1200#, EPM 75, WOB 15.,000#. 8-30 Drilled 8 3/4n 1::.01e from. 10,.505' to 10.,607' (102') in siltstone and cong1omer- ateo Mu.d. wt 12.1, vi.s 61, sand 3, WI. 3.1, cake 2/32, ph 8. Bi. t #87 Core #7 ES-2 1Ìril1ed 174' :i.n 16 hours 10,598' - 10,607' No recovery. 8-31 Drilled 8 3/4" hole from 10,607' to 10,699' (92') in siltstone at 8 minutes per foot. Mud. wt 1.2.3, ds 62, sand 2.6, WI. 2.8, cake 2/32, ph 8.5. Reli.ned drawworks brakes, moved dr:i.11:ing Hne and other repairs. Reamed t1.ght hole 10,330' - 10,598' using 15,000# weight on bit. September 4, 1962 MAIASPINA UNIT NO. I-A Icy Bay-Cape Fairweather Area Weekly Report of Drilling Progress for the Period September 1 - 7 9-1 Drilled 8 3/4" hole from 10,699' to 10,897' (198') in siltstone and conglomerate at 6 minutes per foot. Mud wt12.2, vis 62, sand 2.6, WL 2.8, cake 2/32, ph 8.5. Pump 1200#, RPM 75, WOB 12,000# - 15,000#. Bi t #88 ES-2 Drilled 191' in 17~ hours 9-2 Drilled 8 3/4" hole from 10,897' to 10,964' (67') in siltstone and con- glomerate at 6 minutes per foot. Mud wt 12, vis 61, sand 2.6, WL 3.1, cake 2/32, ph 8. Core #8 10,959-10,964. Recovered I'. Drift 1 degree at 10,959'. Bit #89 ES-2 Drilled 161' in 15 hours 9-3 Drilled 8 3/4" hole from 10,964 to 11,091' (127') in siltstone at 8 min per foot. Mud wt 12.3, vis 70, sand 2.2, WL2.7, cake 2/32, ph 8. Reamed 10,880-10,964'. Pump 1200#, RPM 75,WOB15,000#. Bit #90 ES-2 Drilled 127' in 16~ hours 9-4 Drilled 8 3/4" hole from 11,091' to 11,2101 in siltstone and conglomer- ate at 8 minutes per foot. Mud wt 12.3, vis 69, sand 3, WL 3.1, cake 2/32, ph 8. Reamed from 11,060-11,0911. Bit #91 ES.-2 Drilled 1191 in 16 hours 9-5 Drilled 8 3/4" hole from 11,210' to 11,363' (153') in siltstoþ.e at 6 minutes per foot. Mud wt 12.4, vis 80, sand 3.1, WL 3.1, cake 2/32, ph 8. Pump 1200#, RPM 75, WOB .15,000#. Bit #92 s-4 Drilled 153' in 16 hours 9-6 Drilled 8 3/4" hole from 11,363' to 11,510' (147') in siltstone and conglomerate at 7 minutes per foot. Mud wt 12.3, vis 65, sand 3.4, WL 3.5, cake 2/32, ph 8. Reamed 11,320-11,410, 11,460-11,510. Bit #93 Dr Drilled 144' in 16 hours 9-7 Dri1J.ed8 3/4" hole from 11,510' to 11,649' in siltstone at 6 minutes per foot. Mud wt 12.3, vis 62, sand 3, WL 3.5, cake 2/32, ph 8.5. Reamed 11,390-11,520, 11,515-11,575, 11,600-11,649. Bi t #94 ES-2 Drilled 139' in 13~ hours September 11, 1962 MAIASPINAUNIT NO. I-A Icy Bay-Cape Fairweather Area Weekly Report of Drilling Progress for the period September 8 - 14 9-8 Drilled 83/4" hole from 11,649' to 11,744' (95') in siltstone. Mud wt 12.1, vis 65, sand 3.6, WL 4.5, cake 2/32, ph 7. Pump 1400#, RPM 75, WOB 15,000#. Reamed 11,515-11,575, 11,600-11,649. Bi t#95 ES2 Drilled 95' in 13 hours 9-9 Drilled 8 3/4" hole from 11,744 to 11,843 (99') in si1tstohe and conglomer- ate at 11 minutes per foot. Mud wt 12.3, vis 63, sand 2.5, WL 3.8, cake 2/32, ph 8.3, oil 6%. 9-10 Drilled 8 3/4" hole from 11,843' to 11,912' (69') in siltstone and conglomer- ate. Mud wt12.4, vis 60, sand 3, WL 4.7, cake 2/32, ph 7.5, oi17%. Bit #96 W-7 Drilled 137' in 25! hours 9-11 Drilled 83/4" hole from 11,912' to 12,002' (90') in siltstone and conglomer- ate at 20 minutes per foot. Drift: zero degrees, 30 minutes at 12,005'. Mud wt 12.5, vis 70, sand 3.1, WL 4.2, cake 2/32, ph 7.5. Pump 1400#, RPM 75, WOB 10,000#-20,000#. Bi t #97 W-7 Drilled 46' in 13!hours 9-12 Drilled 83/4" hole from 12,002' to 12,081' (79') in siltstone and conglomer- ate.Reamed 12,004-12,014. Mud wt 12.4, vis 66, sand 3.7, WL 3.8, cake 2/32, ph 8. Bit #98 Bi t #99 ES2 W-7 Drilled 78' in lIt hours Drilled 77' in 132 hours 9-13 Dril1e\8 3/4" hole from 12,ofll' to l2,o82t; (1') conditioned hole for Sch1um- berger ogÈ\. Ran IES, Micro ,:~r":"S,onic and Dipmeter logs. Recovered 9 out of 11 sidewall cores. 9-14 Drilled 8 3/4" hole from 12,082' to 12,141' (59'). Reamed 12,040'-12,082'. Mud wt12.3, vis7lt,sand 3.2, WL 3.4, cake 2/32, ph 9, oil 7.5%, solids 20%. Bit #100 M4L Drilled 59' in 7! hours September 18, 1962 MAIASPINA UNIT NO. I-A ~cy Bay-C$þe Fa~rweather Area Weekly Report of Drilling Progress for the Period September 15 - 21 9-15 Drilled 83/4" hole from 12,141' to 12,208' (67') in siltstone and con- glomerate at 10 minutes per foot. Reamed from 12,004' to 12,060'. Mud wt 12.4, vis 64, sand 4, WL 3.8, cake 2/32, ph 8, oi17.5, solids 20. Pump 1400#, RPM 75,WOB 15,000#. Bit #101 MH3 -C Drilled 33' in ~ hours 9-16 Drí¡led 8 3/4" hole from 12,208' to 12,267' (59') in siltstone and con- glomerate at 40 minutes per foot. Reamed 12,100'-12,141', 12,140'-12,170', 12,155'-12,165'. Mudwt 12.5, vis 63, sand 3.5, WL 4.4, cake 2/32, ph 7.5. Bit #102 H-7 Drilled 49' in I1t hours 9-17 Drilled 8 3/4" hole from 12,267' to 12,330' (63') in siltstone at 15 minutes per foot. Reamed 12,200'-12,210' . Mudwt 12.4, vis 61, sand 3.6, WL 3.9, cake 2/32, ph 7. Pump 1400#, RPM75, WOB 15,000#-18,000#. Bit #103 H-7 Drilled 80' in 1~ hours 9-18 Drilled 8 3/4" hole from 12,330' to 12,280' (50') in siltstone and con- glomerate at 15 minutes per foot. Reamed 12,275'-12,303'. Mud wt 12.5, vis 62, sand 3.5,WL 4.1, cake 2/32, ph 7.5, oil 6.5, solids 18.5. Picked up 102 joints of 3t" aluminum "drill pipe. ' Bit #104 W-7 Drilled 57' in 14t hours 9-19 Drilled 8 3/4" hole from 12,380'-12,399' (19') in hard si1stetone at 4yminutes per foot. Reamed 12,330'...12,360'. Pump 1200#-1400#,RPM 75-100, WOB 10,000#-15,000#. Mud wt 12.5, vis 62, sand 3.6, WL 3.7, cake 2/32, ph 7.5. Picked up additional 72 joints of 3-!" aluminum drill pipe. Bit #105 H-7 Drilled 33' in 12t hours 9-20 Drilled 8 3/4 "hole from 12,399' to 12,409' (10') in hard siltstone and conglomerate. Worked thru tight place at 12,099'. Cleaned out 12,398'- 12,406'. Mud wt 12.2, vis 66, sand 3.5, WL 3.4, cake 2/32, ph 7, oi17%, solids 18.5. Bit #106 Bit #107 ES2 H..;7 Drilled 7' in 7 hours , Drilled 9' in 9t hours 9-21 Core #9 (Diamond) 12,409'-12,417' (8'). Recovered 8'. Ran 8 3/4"rock bit #.108. Cleaned out frant12,365 , to 12,409' and opened ~" core hole to 8 3/4"from12,409' to 12,417'. . September 27, 1962 MALASPINA UNIT NO. I-A Icy Bay-Cape Fairwe~ther Area Weekly Report of Drilling Progres~for the Period September 22 - 28 9-22 Drilled 8 3/4" hole from 12,417' to 12,429' (12') in metamorphics. Mud wt 12.4, vis 57 see, sand 3.3%, WL 3.8 cc, cake 2/3211, ph 8.8, oil 6%, solids 19%. Pump 1200#, RPM 50 - 75, WOB 10,000#-20,000#. Bit #108 W7R Drilled 6' in 7 hours 9-23 Drilled 8 3/4" hole from 12,429' to 12,452' (23') in metamorphic at 56 minutes per foot. Mud wt 12.4, vis 72, sand 3.4, WL 3.3, cake 2/32, ph 8, oil 7, solids 18. Bi t #109 W'7R Drilled 18' in 17 hours 9-24 Drilled 8 3/4" hole from 12,452' to 12,458' (6'). Mud wt 12.4, vis 63, sand 3, WL 3.4, cake 2/32, ph 8.6, oil 7, solids 18.5. Pump 1400#, RPM 50, WOB 20,000#. Bit #110 W'7R Drilled 18' in 14 hours Started running Sch1umberger logs. 9-25 Finished running Schlumberger IES, Micro, Sonic and Dipmeter logs. Rec 14 of 17 sidewall cores. Drilled 8 3/411 hole from 12,458' to 12,497' (39') in siltstone. Mud wt 12.5, vis 68, sand 3, WL 3.7, cake 2/32, ph 8.8, oil 7.5, solids 18. 9-26 Drilled 8 3/4" hole from 12,497' to 12,536' (39') in soft siltstone at 15 minutes per foot. Mudwt 12.4, vis 62, sand 3.·1, WL 3.8, cake 2/32, ph 8.8, oil 6.5, solids 18.5. Bit #111 H-7 Drilled 69' in 22 hours 9-27 Drilled 8 3/4" hole from 12,536' to 12,593' (57') in soft siltstone at 33 minutes per foot. Mud wt 12.3, vis 63, sand 3.6, WL 3.4, cake 2/32, ph 8, oil 7, solids 18. Pump 1400#, RPM 75, WOB 10,000#-20,000#. Bi t #112 EM1C Drilled 31 feet in 14 hours 9-28 Drilled 8 3/4" hole from 12,593' to 12,691' (98') in soft siltstone with sand at 8 minutes per foot. Mud wt 12.3, vis 62, sand 3.7, WL 3.4, cake 2/32, ph 8. Bit #113 ES-2 Drilled 86' in 17 hours. October 2, 1962 MALASPINA lINT'l1 NO. I-A Icy-~ay~Ca~e :Fa!rweath,er-A~~ Weekly Report of Drilli.ng Progress for the Period September 29 - October 6 9-29 Drilled 8 3/4" hole from 12p691' to 12,744' (53') in siltstone with. sand at 8 minutes per 1'oot. Core #10 12,744'-12,751'. Recovered 7'. Mud wt 12.3, vis 62, sand 304J WL 3.4p cake 2/32, ph 80 Bit #114 ES-·2 Drilled. 103' in 15~ hours 9-30 Reamed core hole and d.rilled 8 3/4" hole from 12,751' to 12,816' (65') in sand and conglom.erate at 12 minutes .:per foot. Mud wt 12.4, vis 61, sand 3.7, cake 2/32, ph 8.5~ oil 7.5, solids 18. PtJ.mp 1200#, RPM 75-80, WOB 10,000#-20,000#0 Bit #115 ENIlV Drilled 34' in 7 h~rs 10-1 Drilled 8 3/4" hole from 12p816 , to 12,880' (64') in siltstone and sand at 17 minutes per foot. Mud wt 12.5, vis 62, sand 3.7, WL 3.6, cake 2/32, .:pD, 8, oil 6, solids 19. Bit #116 ES-2 Drilled 65' in 15 hours 10-2 Drilled 8 3/411 hole 1~rom. 1.2Jtf1J' ·t.ol.2,927' (1J.T) i.n sand and siltstone at 18 m1nutes per foo·f.;o MÜd wi; 12.4)1 v1s 61p sand 3.5, WI, 3.2, cake 2/32, ph 7.5. Bit #117 Etl1:1V n-,... ·1'j ·d r-4" ~ 71 b·' ,w"" l ~e,,) In..1. '2 ' .Ou.rb 10-3 Drilled 8 3/4H hole from 12.99~7' to 12,~.rr()¡ (43') 112 sand and siltstone at. 28 minutes per footo :rvs.~),d wt 12.4',1 vis 5'7:1 sand 306.~ WI, 407, cake 2/32, :ph 7.5, oi.l 6p solids 19.. Pump 1200#, RPlYL 75-BG, WOB lO~OOO#-18,Ooo#. B1t #118 EMIV Dri1~ed 38' i.n 13 :.IoUX's 10-4 Drilled [~ 3/4" hole from 12,9'[0' to 13~O:::nu (5'7') in sand and siltstone at 19 minutes per 1'00'\:,,, Mu.d we 12..3, vls 62, sand 306, WL 305, cake 2/32, .:ph 8, oil 7..5, solids 18..5.. Bi t #119 mlV D . 11 - 56 i i') f..]. 'f rl ed n ''''''+"2 ,.lours 10-5 Drilled 8 3/411 hole from 13,027 to 13,092' (65') in siltstone with sand at 18 minutes :per foot. Mu.d·wt 12.3, vis 64, sand 3.5, WL 3.8, cake 2/32, ph. 7..5. Bit #120 s-4 Drilled 61' in 15~ hours 10-6 6:00 A..M. Drilling at 13,114 in siltstone at 17 minutes .:per foot. October 9, 1962 MALASPINA. UNIT NO. l-A Icy Bay-Cape Fairweather Area Weekly Report of Drilling Progress for the Period October 6 -12 10-6 Drilled 8 3/4" hole from 13,092' to 13,153' (61') in siltstone at 16 minutes per foot. Mud wt 12.4, vis 59, sand 3.2, WL 4, cake 2/32, ph 7.5, oil 6, solids 19. Pump 1200, RPM 75 - 80, WOB15,OOO# - 20,000#. Bit #121 EMlV Drilled 58' in 15t hours 10-7 Drilled 8 3/4" hole from 13,153' to 13,219' (66') in siltstone and sand at 16 minutes per foot. Mud wt 12.4, vis 64, sand 2.9, WL 4.7, cake 2/32, ph 8, oil 6, solids 18.6. Bit #122 ES-2 Drilled 72' in 15t hours 10-8 Drilled 8 3/4" hole from 13,219 to 13,281 (621) in siltstone with sand at 14 minutes per foot. Mud wt 12.4, vis 61, sand 3.3, WL 4.1, cake 2/32, ph 8. Bi t #123 ES-2 Drilled 62' in 16 hours 10-9 Drilled 8 3/4" hole from 13,281 to 13,351 (70') in siltstone with sand at 13 minutes per foot. Mud wt 12.4, vis 62, sand 2.9, WL 4.2, cake 2/32, ph 8. Bit #124 ES-2 Drilled 64' in 16 hours 10-10 Drilled 8 3/4" hole fran 13,3511 to 13,4281 (77') in siltstone with sand at 10 minutes per foot. Mudwt 12.4, vis 62, sa~d 3, WL 4, cake 2/32, ph 8, oil 7, solids 18.5. Pump 1200#, RPM 75-80, WOB10,000#-20,000#. Bit #125 ES-2 Drilled 80' in 16t hours 10-11 Drilled 8 3/4" hole from 13,428' to 13",510 (82') in sHtstone and sand at 12 minutes per foot. Mud wt 12.4, vis 59, sand 2.5, WL 3.4, ph 8. Bit #126 ES-2 Drilled 72' in 16t hours 10-12 Drilled 8 3/4" hole from 13,510' to 13,565' in siltstone and sand at 12 minutes per foot. Mud wt 12.3, vis 69, sand 3.3, W1 3.5, cake 2/32, ph 8. Drift: zero degrees, 10 minutes at 13,551. Bit #127 ES-l Drilled 84' in 15t hours. October 15, 1962 10-13 10-14 10-15 10-16 10..17 10-18 10-19 MALASPINA UNIT NO. 1-A Icy Bay-Cape Fairweather 'Area Weekly Report of Drilling Progress for the Period October 13 - 19 Drilled 8 3/4" hole from 13,565' to 13,6201 (55') in siltstone at 14 minutes per foot. Mud wt 12.3, vis 63, sand 4, WL 4, cake 2/32, ph 7.5, Pump 1200# - 1400#, RPM75 - 100, WOB 10,000# -20,000#. Bit #128 Drilled 41 feet in 15~ hours s-4 Drilled 8 3/4" hole from 13,620' to 13,658 (381) in siltstone and sand at 15 minutes per foot. One hour working pipe thru tight hole from 13,625' to 13,637'. Mud wt 12.5, vis 67, sand 3.6, WI. 4.1, cake 2/32, ph 7.5, oil 7.5, solids 20. Bit #129 M3...t Drilled 45' in 14~ hours Drilled 8 3/4" hole from 13,658' to 13,695' (37') in siltstone and ænd at 10 minutes per foot. Mud wt12.4, vis 66, sand 3.7, WL 3.2, cake 2/32, ph 8, oil 6.5, solids 20. :Bit #130 Drilled 38' in l3~ hours EMIV Drilled 8 3/411 hole from 13,695' to 13,715' (20') in siltstone and sand at 25 minutes per foot. Aluminum drill piþð pàrted while drilling at 13,715'. Tool joint box pulled off aluminum pipe 17 stands and 1 single below rotary IŒ. Fpund top of fish at 1605'. Milled over and recovered all pipe using overshot with circulation. Laid down 6 slightly bent steel joints of drill pipe. Mud wt 12.4, vis 62, sand ].2; WL 3.3, cake 2/32, ph 8. Bit #131 Bit #132 Drilled 36' in l5~ hours Drilled 4' in 2 hours EMIV EMlV Drilled 8 3/4" hole from 13,715' to 13,731' (16') in siltstone and sand. Mu~ wt12.4, vis 64, sand 3.5, WI. 3.2, cake 2/~~, ph 8. Drilled 8 3/4" hole from 13,731' to 13,761' (30') in siltstone and sand at 32 minutes per foot. Mud wt 12.4, vis 64, sand 3.3, WI. 4, cake 2/32, ph 7.5. Bit #133 Drilled 29' in 19~ hours EMlC Drilled 8 3/4" hole from 13,761' to 13.,791' (30t) 'in siltstone and sand at 35 minutes per foot. Mud wt 12.4, vis 62, sand 3.4, WI. 3.6, cake 2/32, ph 9. Bit #134 W-7 Drilled 27' in 15 hours October 23, 1962 10-20 10-21 10-22 10-25 MALASPINA UNIT NO. l-A Icy Bay-Cape Fairweather, Area Weekly Report o~ Drilling Progress ~or the Period October 20 M 25 Drilled 8 3/4" hole ~rom 13,791' to 13,8161 (251). TD correctèél. to SIM. Picked up diamond core bérrél. Mud wt 12.4, vis 66, sand 3.9, wt 3.8, cake 2/32, ph 8.5, oil 7.5, solids 18. Bit #135 DT2G Drilled 40' in 21 hours M/V Mr. Bill wai~ed on higher tides before departing Yakutat ~or Malaspina. TD 13,8231. Core #11 13,816-13,823. Recovered 71 hard siltstone. Ran Schlumberger rES and Microlog only. Started laying down drill pipe. Bill Clifton, mud engineer, departed. M/V Mr. Bill waiting ,on higher tides be- fore departing Yakutat ~or Malaspina. Placed cement plug from 83251 to 81781 (1471) using 50 sacks Slo-Set cement w/2% gel added. Finished cementing at 4:00 P.M. Finished laying down drill pipe and started tearing out. Plugged top of casing using 20 sacks of cement. Welded steel plate over hole with 4" coupling in center for screwing in marker p~pe. 9 5/811 casing bowl wa s not removed. November 2, 1962 UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY AtICpf\'~AGÉ ~~d';er~;~::~·No. 42-R356.5. , LAND OFFICE ____-Ø:!}çI~9.~ªg~uu________ lEASE NUMBER ____Q2_Y:.2l6.._____uuu_____ UNIt. __I~¥--B.ªY--:-- ç_ ª,..P. ~_ _f': ª;i. I:::____ weathe~-Mala~ina [' LESSEE'S MONTHLY REPORT OF OPERATIONS State _____~~?:~~?:________ _______u Oounty u!~~~~~~u::_~_~~~~.::____ Field __._MªJ_Q._~JìJ_tl_ª-__________uu___________n__________~______ The followin~ is a correct report of operations and production (includin~ drillin~ and prodlwint wells) for the month of ..::~~7---Q-ÇJ.g.Þ-E?X----------------. 19_?_?__. _______________,_____________n___mnn___________________________________ . .'-....l .,1tent's address _________m__n___J=ºQº_J?~!!:ygf'uº1~Q__~1ª.K~___ _______________________________________ n______JJ.~º-Y:~ I: J___QºJ,º~ªª.9_______u__n__ Phone _____n___ _____ ___ _ ______ __ _ __________~Q.:?:I 2n_______un ___u___________ Company _º ~l~?dVÇ)þJ. ß:__Qª_~__º_ºf'Jì_:___________ Sitned u~LI.\,-.f~~J-~&l¥ma:~þ~u-n- .,1tent's title Yl_c_e_ufx.e_9_:Ld.e_1J.t.J___P-I:lg.JLP.I:-ºª . BEc. AND ~or~ Twp. RANGE "t.~L DATS PaOD11CII:D BARRELS or OIL GRAVITY Cu. FT. or GAS (In thoUSBnds) o ALLONS or GASOLINE RECOVERED B.\RRELS or WATER (If none, so state) REMARKS (If ddUinc. depth; if shut down.. cause; date and result or te3t for IMoUne eontl:'nt of p:as) ---- NE Sec 31 24s 32E lA -0- -0- -0- -0- -0- Drilled to 13,823. / Core No. 11, 13,816 - 13;823, Rec 7'. Ran ES & Micro logs at 13,816 --"" 0" .Jl~ rs "......, r-""1 r '-.~~:'} ]) , , ('¡ ~ ''''0''' I \ ,_ I [ ;-j l':~':-' ¡ ¡ .' ¡ I _1 LC, .'" L~ , U LC> _.1 OCT 29 19G2 Plug of 50 sx. 8325-8178. Plug of 20 sx 50 - ). Marker Set. CO;¡;;Cfva{j()'1 Division U. S. GEOLOGICAL SUlWE:Y Anchorage, Alaska Wel~ P & A. October 22, ~962. Note: Cqres& logs were cut for geo1Jgica~ information and contained no shows 0:::' oil or gas. E no . no NOT .-There were __________________________u__________ runs or sales of oil; _Un_n_n______________________u______n__ M cu. ft. of gas sold; -------------------~?.---------------------- runs or sales of gasoline during the month. (Write "no" where applicable.) NOTE.-Report on this form is rcquired for cachcalcndar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Fonn 9-329 (Janunry 1950) 10-25706-9 U. 5. GOVERNMENT PRINTING OH'lCt .' . '":ORE LABORATORIES. INC. Pevolewn Reservoir E"I5Ù¡err¡ng DALLAS, TEXAS October 29, 1962 REPLY 1(..'1 P. O. BOX 655 BAKERSF"lELD, CALIFORNIA Colorado Oil and Gas Corporation Box 149 Denver 1, Colorado Attention: ~ir. D. G. Denson Subject: Mud and Cuttings Analysis Mnlaspina No. 1 .d '''''......~,.,. .. Malaspina No. l-A~- Yakutat, Alaska --. , " Gentlemen: u A cOí1bination drill cuttings and core analysis field laboratory fì.ll':1iGhcd by Colorado Oil éind Gas Corporation, and manned a.Yld equipped by Core Laboratories, Inc., was present at the site of the subject vre11 t!1roughout drilling operations from surface to 13,824 feet. Using standard technj.ques and equipment the drilling fluid vras r.lOnitor('.~~ continuously for the presence of hydrocarbons, and the drill cutt:ngs were checked at regular intervals for the presence of hydrocarbons, and lithology. The' results of these operations are shcwlD on the accompanying Grapholog. Malaspina Ho. 1 was log¿::ed from sm'face to 1803 feeto After an \l."1successful casing job at 1803 feet, the rig was moved and tho ¡¡ell was redrilled a~ 1Ialaspina No. I-A. Malaspina Ho. I-A '\'las loeeed from 1800 feet to 13824 f~et, total depth. ~í:J significnnt ShOYl of oil or gas vras encountered. I VTe trust that our services have beon of assistance in the evaluation of thia well and that we maJ" be of further assistance to you in the futm'e. Very truly yours, COJæ Lr~BORATORIES, D1C. ~~b 7(:2I-~~ Dill R. Works Engineor-in-Charge DRa:sm 5cc. and 1 Sepia - Addressee , nN:~ f,Tf'¡1"" . ~,.) :j" ',~,'~_..r~ ~ t':J Form "-331a (Feb. 1961) Budget Bureau No. 42-R3ð8.4. Approval expires 12-31-110. I I . I I -----t----- ----_. -----. I I I I I .-----,'----- -----1----- I I I , , I , I , , , , , I I -----'0.----1__--- ,._____ , I , , I , , , , , ' , I ! I x (SUBMIT IN TRIPLICATE) Land Offic.oho_Anchorage___ Lea.. No..024916--____n_n_n Unit -I.Qyoo~...cape.-.F-&ir.. weatl1er-Malaspina UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY SUNDRY NOTICES AND REPORTS ON WELLS NOTICE OF INTENTION TO DRILL._____uuu__uu_u_u____.____ __m_ SUBSEQUENT REPORT OF WATER SHUT-OFF__u_______m___mu_ m__ NOTICE OF INTENTION TO CHANGEPLANSu____mm_u____m_ ___u_ SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING___u______.m_ "____ NOTICE OF INTENTION TO TEST WATER SHUT-OFF_m____._____ m___ SUBSEQUENT REPORT OF ALTERING CASING_____m_______________ _____, NOTICE OF INl1NTION TO RE-DRILL OR REPAIR WELLu__m__ m___ SUBSEQUENT REPORT OF RE-DRILlING OR REPAIR_m._uu______ --___ NOTICE OF INTENTION TO SHOOT OR ACIDIZE___________u_____ u"___ SUBSEQUENT REPORT OF ABANDONMENT_____m__________________ X-- NOTICE OF INTENTION TO PUll OR ALTER CASING____u..m.__ __m_ SUPPlEMENTARY WELL HISTORY__m___m_______mm___________ -____. NOTICE OF INTENTION TO ABANDON WELL._m_____m_mm__ __m_ m__oo_u__m______m_m_u__m____m___um_______um____m__ moo' ---.-------------------....-------- - ---._ ------- ----._____ -------'. --- - -- - - - --- - - - - ---- -. - .-- ·or-------- -------------- .---------.----------- ----.-------- -----. (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT. NOTICE, OR OTHER DATA) ----m---m---m----uoo--Ootobepu23----oo-----------------. 19___.62 Well N~K~__~~cated ),m_u ft. from~ine and ---"3-3000 ft. fromJ¡J line of sec. 000---3-1-- ~L~~~__~!____________ _000___000______ ____~~~__u____m___!~u___ m____Q~P_E~~..!!!~~_ (U Bee. an.1 Bee. No.) (Twp.) (Range) (MeridIan) ____~~~~p-!~________m____ _"__000 ______X~~_tï_ _.YJJ1~_______m______m _oou_~ª~_. _____oooo__u__________ (FIeld) (County or SubdivisIon) (State or Territory) The elevation of the derrick floor above sea level is ----3.5.--- ft. DETAILS OF WORK (Stat. n.rn.. of and expected depth. to objectlv. oand. .how .1...., w.lehto.and leneth. of propoaeclceelne'llndlcete rnuddlne jobo, cernent- Ine point., and all other Irnportant propoaed work) 1. Cement plug of 50 IX slo...set plus :!/ø sel placed trom 8325-8178. (9 5/8" csg. set at 8280) 2. Cement pl~ of 20 ex IIlo-set plus 'i!!/o gel placed. front 50...0. Appropriate pipe marker placed. 3. Malsspina Unit No. 1 "A,I P Ie Aj 4:00 P.M. October 22, 1962. '~Tl'nOVED......,.[''.~"'~. _!..?~.J~ß.?__~~_ .. C·--(J-1. ,1/'""11 :,"/)j!'¿' /1 ~'.'.. .....yI(,-..... /""._../1__.. . ..Ab.....<../f...5..Æd_w_... Ikgíooal Oil t.'{ G s Supervisor I und.ratand that thl. plan of work rnu.t r....I... appro..alln wrltlne by the G_I....lcel Sun.,. before operation. rnay be cornm.nc:ecl. Company ____~º~__ºg.__~__~__g-º!W9.M~~ºª______.____________________________________________________________________ Address _oo____!ººº__~~~~__ç~~Þ___ª~l~!.~_ ....---..--------..--...---------. ----- ------ -- ---~ -_..- -- ----------- -.... ------- By _oodt__rz_.(f!l~_~:_ooð"~_________ J. R. Coleme.n. Title .v.1ee--Pre-s-i4en't;T--DF!U!na--&.-~oduct1on _______________m_ _~~!~!'..t_JJ_QJ.º_:r.~_º___ __________ _______ GPO 862040 . '. . . Form ~-831a' (Feb. 10M) : Å ._ _ (~.lJB~ IN TRIPLICATE) I "-'-;0 .' ¡J. - . rÙ"-? -, n!1 [ --T---mmtj lli ßJ k~ vlli * TED STATES -----¡-----r----j-·-V \ DEPAR1~§ T OF THE INTERIOR _m+____!_m+_":::! U OCT 29 1962 GEOLOGICAL SURVEY · I . · ' . · I . · ! . ~NCHORIiG' Budget Bunmu No. 42-R31\8.4. Approval expires 12-3H O. Anchorage Land Offi". __________u.______________ ; ¡ '; ~ ¡ F , , Le... No.____ 2g~9.~§__________ Unit __~~y__ª?_J:::9~1'::__A'_~Jrweather Malaspina SUNÐïi~~£t~i~wEÁND REPORTS ON WELLS t NOTICE OF INTENtiON TO DRILl.___________________________.____ ______ SUBSEQUENT REPORT OF WATERSHUT-OFFu____________n_______ _____ NOTICE OF INTENTION TO CHANGEPLANS_nu__nmum_~_n_ ______ SU£¡SEQUENT REPORT OF SHOOTING OR ACIDIZING______________h __m· NOTICE OF INTENTION TO 'TEST WATER SHUT-OFFm______um ______ SUBSEQUENT REPORT OF ALTERING CASING__n___________________ _____ NOTICE OF INT~NTION TO HE-DRILL OR REPAIR WELlm____n ______ SUBSEQUENT REPORT OF RE-DRlllING OR REPAIRun__mu__u_ _om· NOTICE OF INTENTION TO SHOOT OR ACIDIZEm__m__________ ___m SUBSEQUENT REPORT OF ABANDONMENT__________________________ __m NOTICE OF INTENTION TO PUll OR ALTER CASING___._____u___ ____u SUPPlEMENTARY WEll HISTORY _______u___m__m_____m.______ _____. NOTICE OF INTENTION TO ABANDON WEllnm_n_~---- _Xn ____________mmm___m___m__n_____n____um_mm___mnm_ m__· ----- ---... ---- -..-_......... --... -- ---.................. - --...... ~... -- -- --.................. -_... --- ---.;. -... - -......... ......... --... ............ ---............ -- -..---_......... ---......... --- -- --.................. ----............ --...... -----......... ---- --... ---... ... -- --. (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT. NOTICE. OR OTHER DATA) The elevation of the derrick floor above sea level is ____35____ ft. _.m___m_______m__________Q~:I1g~~r__Z3.,--------mu------, 19__62 . Malaspina Unit xM ~} Well No. }_-::~__________ is located ),Q2L_ ft. from_ line and __33Q_m ft. fro line of sec. ___3l____ ,.5 ____~L~__~::~ _)!: ________. ____un_ ____~.__~~~____ _______B.3?!? ____m _________Ç_9.P..R~L_B~y~r ~ 0( Bee. an.! Bee. No.) (Twp.) (Range) (Meridian) ¡;:~ Malaspina Yakutat, Village Alaska ~ .------- ----- -- -- -(Fièid) - -- --- - - - - -- - - -- --- ---- - - - - ---- - - - (õõüiiiÿ -õiSüb(j ivisïõñY ___u__ --- -- m _U .---- -- -(SiáiëõrTèiiiiõrÿY--m- - - ----- ~ ~:~ ,J 0' ~1 .~ ~~ ~ c.1' N 1-- <J <.::> z o H L'> n ... ~rj (State namea of and expected dt!lptlu to objective sanda; .how eize., we1aht..; and lengths or pro~o.ed c.elnca; Indtute muddinc jobs, cem.n~ \. '. Ç:..( Ine polnh. .nd .11 other Important proposed work) '{~ ~ .\ \..... ..J'~ ... ...}:.J} ¡.~ '. -« l--4 ' '-, \~) ~¡~ "'.:J ~ () ~), p:{' r-i ..\' f) [---I_ ).i:'~ f~V~\\~' f~j- ~~ '.~:~ ~.:ì.~. ç;_, >:) ""I~':.... ~} tJ) - """:- rJ:; ,.r\, ). :·'CIJ ..¡ " ~ H ~<) c3 6 -.,\\".. !,.. P-i'" 0<) F.: ~ì I under.ta.nd that thh plan of work must receive .pprov....1 In wrltlnl' by the Geoloclcal ~urvey before operation. may be c:ommenced. ..-::! -C) DETAILS OF WORK L Cement plug of 50 sx slo-set plus 2% gel, 8325-8178, 9-5/8" casing set at 8280. 2. Cement plug of 20 sx slo-set plus 2% gel, 0-50. pipe marker will be placed. Appropriate 3. Malaspina Unit No. l-A P&A. (-'7)' ,,¡ifU..dded by U.S.G.S.: Confirming telephone conversation -( ~. M. H. Soyster and Don Meek on October 20, 1962). bet,,,een Company ___Ǻ~º~2__ ºJf.__~__9h§___Ç_9.:Rr..QM~¡QN_____________________m____mmm__________n_____m____m____u__________ Address _______J.ººº__P-~Dy~:!_:._ºb!Jº_J?}J.ilªj.ng ---------------.._------- ---- ----- -... -- ------ -' -- ------- ------ ---- -... ----- By _Jrl~g~----- J. R. Coleman Title _.Y_tç.E?__J).r.~ê.~çl,~nt~.);¿;riJ.l.iJ].g._%__.r_rocl u c t i on ___m______________J)~DY~J:., ___C_olo.r.a.dQ _m.________m__ GPO 862040 .' . Company Colorado Oil and Gas Corp. Location Sec. 31.T34 S.t R. 32 E.. ~rJ1 A-0249l6 Well No. !wlnspina Unit ~l-A Lease No. ~ Your proposed plan of abandonment is approved subject to following conditions: 1. Compliance with Federal Oil and Gas Operating R~gulations. 2. Changes in approved program must receive prior approval of the District Engineer or the Regional Oil & Gas Supervisor. 3. Oil or gas zones either previously productive or correlated with produc- tive zones must be protected by adequate cement plugs. 4. That portion of the hole between cement plugs shall be filled with heavy mud fluid. Top of the hole shall not be closed until the District Engin- eer or the Supervisor has been given an opportunity to inspect it. 5. Abandoned wells shall be marked with markers consisting of a pipe not less t than 4 inches in diameter and not less than 10 feet in length, of which 4 feet shall be above the general ground level and the remainder embedded in concrete. The top of the pipe shall be closed with a cap or cement plug and the marker should show in a permanent manner the name of operator, ~ell number and location. 6. Equipment and valuable material shall be removed from the well site or dis- mantled and arranged in an orderly manner; junk and debris shall be removed or destroyed; pits and cellars shall be filled and leveled and the well site, including sumps, shall be placed in a clean and orderly condition. 7. The hole should be converted to a fresh water well if practical. 8. A subsequent Report of Abandonment on Form 9-331a, giving a detailed ac- count of all work performed, including location of cement plugs, casing pulled, casing left in the well, date of placing surface plug or cap, shall be filed in triplicate, within 15 days after completion of the work and the District Engineer or the Supervisor shall be notified when the well site has been clea~ed up and is ready for inspection. Mailing Address: U. S. Geological Survey Box 259, Anchorage, Alaska Office Address: Room 505, Cordova Building Phone: Office BR-505ll Nite: BR-4914l FE-34722 \"'.,....... A/ ...j \/. I '-<- \j 1·· ~r:rn $.-831a (FelÌ. 1(51) D} L~ I [~ L; U ~I g JD J\. SEP 10 \&-&hMIT IN TRIPLICATE) . ~ {~..~~ J: j-~r¡(.j-f ~,~,GE Budget Bureau No. .2~R3õ8... Approval expires 12-31-'00. ----... P"---- ----_. ..._-.-. Conscr\'at~~¡;., ?Un'fffP STATES U.S. GEn~I~~~~~Æ~~P¡fIöF THE INTERIOR A c> GEOLOGICAL SURVEY Lan~ Offic. ~_At)._~þ_?~?:g~____~_ La... No. Q2.1+91-J;~_______________ ----......' UnIt __~~Y.:_J~ê-Y__.Q_ª.P_~___~i rwea the r alaspina ./ ~ 1'>, ----,'....,.-........:.."......'. x ----- i-----' ...---- ¡-...--- I I I I I I I I I ----- ..-_---1-_--- ,.......___ . . . I I . I I I I I . I ! I SUNDRY NOTICES AND REPORTS ON WELLS NOTICE OF INTENTION TO DRILL__________________,______________ ______ SUBSEQUENT REPORT OF WATER SHUT-OFF.______________________ __on NOTICE OF INTENTION TO CHANGE PLANS_______________________ __.___ SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING__n____:_______ _____ NOTICE OF INTENTION TO TEST WATER SHUT-oFF._____________ ______ SUBSEQUENT REPORT OF ALTERING CASING_______________________ _____. NOTICE OF INT~NTION TO RE-DRILL OR REPAIR WELL_________ ______ SUBSEQUENT REPORT OF RE-DRILLING OR REPAIR_______________ _____ NOTICE OF INTENTION TO SHOOT OR ACIDIZE__________________ ______ SUBSEQUENT REPORT OF ABANDONMENT __________________________ _____ NOTICE OF INTENTION TO PULL OR ALTER CASING______h_n~__ __..___ SUPPLEMENTARY WELL HISTORYh_______________:..__________u_____ _____. .~ NOTICE OF iNTENTION TO ABANDON WELL_un_______________ ______ _m___Casing_.Setting_n__m__________m___c__u________ JL. -;~\ .'~"("(' < 4) ------- ------ - - -- -- - - - -- - --..... -- --.. - - - - - -.... - - - -- ---- -- -.., -- -.... --- -- -..... - - - -.. - - - - --.. -.. - - -.. - -.. -..--- - -- -..... - --- -.. -- - -- - "': - -- - -- -- -- - ---... - - ----... -- -..... --- --- -- - - - --. (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT, NOTICE, OR OTHER DATA) _u ___________u____. _ ____ ___§~l:?.t ~mºg:r__l__ ______________m_ _, 19Q~_. Malaspina . IN1 ~ IE 1 Well No. _1_-:A__________ is located¡Q21_____ ft. from_~ line and __I~º__n ft. frou~line of sec. .__3J.____ __~L~__e~£__3~__ __ _______.________ ___~_?_~_$__m__._______~3..?~,______ .__Qº:R:R§:~_.~?::!~?;_____ m Bee. anj Bee. No.) (Twp.) (Range) (MerldilUl) -.Ma1aspin~lèid)'-----------------· ----Ya.ku.~&ù-Yi; ~r 1~b~~lsjõñY-------~------- _Ala.ska.__u__, .. __ ____ n___. u ___ ____ (State or Territory) The elevation of the derrick noor above sea level is ____}2.___ ft. DETAILS OF WORK (State name. 0' and expected depths to objective ...nda; ahow .izea, welgltte.;"nd lfiinatha of proposed eaalnl'lI;lndlcate rnuddinc job" cement- In,. þolnt., and all other Important propo.ed work) Set 199 jts 8279.67' (inc. float 1.69' & guide 1.79') 9 5/8" csg. A.O. Smith S-95, 43.5 #/ft'J SMLJ R-3 at 8294.27 KB. Cemented with 325 sx. Slo-Set cement plus 3% pre-mixed gel. ;~f'TJì();ir;rJ"··;Tr',>·~::"":~ :~ .1~~X~ ~_.., .,.~/?f) // .//1.(' / , ¡c/~/:~ ....._..:....:..-.L';-...i..1.~·: ·"'''.'r'''·':~· t..~,,,";',' .'''''' :H~,;~::i')1',),l't C.iiJ. {~~.~. c...~(: ::·;~;r,;~j,~·,~Î)t~r -.' . , I under.tend that this plan of work muat rec.elve appro'Yalln writ)n&, Ly th. CeoJo&lcat !:urvey before operation. tnay be commenced. Com pan y .__ _ Gº J., ºKªªº_ _ Q.:i 1__ ª_Œi __G_G._ª___ç_o_:r.;p. Qr:ª- ti Qn___ __ __._____________________._.________m_______________ _.__ ______"______ Addrèss J;.QQQ_J¿~ny:~r:__C.lub __B ui lcling______. By __~lfZcy~ J.R~oleman Title __no _ ___v.:ü~~ ::fr:~ fiidsm:t_______n____________ ______D~ nY~ :r~_ _ C .olDr.ad.o_ __ __ _ h_ ______ __ __h__ ____ ____ ___ .._..________~_ ____ __ __..___ ___ ___ __ w___ __ ____ _r ____ ______ ___ __ _ _ __ _______ GPO 862040 ~..< f L~:j (i'~ '/"\'.. o¡;_~ ):: , .v~ .., UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Budget Bureau No. 42-R356.ð. Approval expires 12-31-60. lAtIOOFFICE ._AnÇ.hQrªei5:___c_u_______ LEASE NUMBER ____~!t2J.~____.___u_______ UNIT L::y_)3.?-y__.Ç~J2~__Eª_t:r!!_e:ª:t!h e r Malaspina (\ '.J t~i~ fj ~ì~';~Jr; ';.-\'-."". - I (~~ ,~.."~,,,-,..., .. I' 'J ~·:,~,..L:·~ ,. " LESSEE'S IVIONTHLY REPORT OF OPERATIONS State Alaska 0 Yakutat Village. Malaspina ' - --- _u___u__ - __u_____ --- _ n____ oun ty -------------____uuu_u_____u_u FL eld _u ____ _ _ __ __ _ _ _ _ __ _ _ _ _ _ _ __ __ _ _ _ _____ __ _u_ _u__ ______,_ __ ____u_u The followin~ is a correct report of operations and production (incll[,din~ drilling and producing wells) for the month of _u_~::!:~::~~::::___~~.~-------, 19_~~., ----------------___________________u_________________________u_u_________ lit,,,,,· addm. .um..uu...;I,gQ).J?~."y~.>:.n:u.bu.!'~~"_~...... Oampa"y .().O.l.O'f"'R.~.~c:O'':!'~..-.m. --.-------------------------------u_____~---~~gy~!'..t--ºg2-REªª_2.________________ Sitned u--------¿,.;r:--R-:~~lëmãri-:..~~------- Phone -----------u----------------------.AfL2_-:797L___"__________ _____________ Agent's ti tle __Jlice.uEre..s ide.nt_'_J__J).rlgJk_.P..:rod . SEC. AND WEI.L DAttl Cu. FT. OF GAS GALLONs or BA RRELS OF REMARKS Twp. RANGE BARI\BLS or 0 It GBAVITY GASOLL"E W ATEB (II (If drilling. denth: if 9!tUt. down. came: ~OJ'~ No. r.-ODVCBD (In thousands) date and result of t~;'it for «Moline RECOVERED none, so state) content ot I!a~) --- NE See 31 24s 32E i-A -0- -0- -0- -0- -0- Drilled to 12~816 Cor2 No, 8 10,959 10 , 961~ , rec., l' . Cor2 No, 9, 12,409 - 12,417, rec. 8' . Cor2 No. 10, 12,744 - 12,751) rec. 7 I. I-··~~:~';'~~;;,:·l~ i 1 i ,i!. II. j:")~/~:\lr i...., ., ....~-,:. ...".,.....,. ,'" ",.;..~·",,"I""-~( ~- Ran IES, Micro" Sonic & Dip:-neter logs at 12,.?61 & 12}4?L ___..._~_._~~ ~9 NOTE: Core s & logs werr~ cut for geo10g ical information and contained no 3hows of oil Jr gas. . NOTE.-There were _____uu__!'!9__u_________m_______ runs or sales oC oil; ------_~~______u____________u___________ M cu. Ct. of gas sold; \ ____________________!'!5?____________________ rllns or sales of gasoline during the month. (Write "no" wh~re applicable.) MOTE.-Report on this Corm is required for each calendar month, regardless of the status of operations, .and must be filed in duplicate with the supervisor by the 6th of the succeeding month; unless otherwise directed by the supervisor.' Form. 9-829 (Sannary 1900) 16-25766-S u. s. GO'f'iRNMEHT ~RINTIN4 0"1C:£ .;: \....... .~tV: k ýt// UNITED"STATES DEPARTMENT OF' THE INTERIOR GEOLOGICAL SURVEY Form approved. Budget Bureau No. 42-R356.5. LAND OFFICE __m~º-çþ9-r.ªgg_.___m_u lEASE NUMBER _u02-'='-_0'16__________u__u_ ~--.¿..- UNIT _Ic.y_.Bay::o,__G.a p.e._.F..ainæ.a the .M.9.1aspina / -~\ LESSEE'S MONTHLY REPORT OF OPER~TI~NSï~().;rÈJ)-~! . l('n? i State ___A.t.ª_9_~ªu___________u____ Oounty .xªtl1tªt_.Y.IJ,J,ªg~_____ Field __u__M§.lçu~I?inª___m_~_' _u__~~~___~~~____~_~~:___u ; The 10Uowin¡! is a corr~Þ report 01 operations and production (including dri~ling·.:ándr.proddCing ~ ~~ 6 __......"_._...._..h"__.~_." wells) lor the month 01 m______u:.:..___A!Uim_9_t______________, 19___2_, _.,_____._________m_______m_________u________u__________u_mmu___ A ¡! ent' s address _______u__u____________:e,_Q, _:ß_Q-K__71±9.________u__________ Oompany ----C-QlO-?3;Q-t.~.:<1~s..~=t.i on _________ ______u - - _____ __ _, _u., m - ____ - u _m - _!?~::::~ :!.u9_?_~_?_r..~~_______ _m_ Signed u_ - --- r!-f (- ~ - --- P ho ne _____ ____ ____ __ __ __ ____________ .--u----AG--::2::19.7.L u_m_u_ _ ____________ A ¡! e nt's ti tl e _J...R... Go1ema n u:-:.Y. i.cB..-= Pr.e..sidBn. t BEC. J.ND ~OJ'~ Twp. RJ.NGE 'r.E;.L D....,.R PBODtfCSD BJ.RRELS OJ' OIL OnJ. VITI' Cu. FT. OF GJ.S (In thousands) o J.LLONS OF . 0 J.SOLlNE RECOVERED BJ.!tRELS OF W UEE (If none, so state) REMARKS (If dri11iøc. depth; if shut down. cause: date and result of te~1; for losollne content of ttas) --- NE Section 31 24s 32E I-A -0- -0- -0- -0- -0- Drilled to 10,699 Set 9 5/8" csg at 8294.27 with 325 sx Slo-Set cement plus 3% gel. Core #5j 9453-55,reç 2 feet. Core #6j 9517-21} rec 4 feet NOTE: Cores Nos. 5, 6, and 7 were cut for geological ~nfornati02 and contained no shows of oil or gas. Core #7, 10,598- 10,607, no rec. Ran XES, Micro} Soni, and dipmeter logs at 10,424. "'.., :" -~ - ',' ."~'" ~···f~·'" r.· .. . ") ¡ 1 , ì , . i '''5'bt.~......:,"....,-...,..........._, ,._.......... .'.....,..,.."._~......'"...., .",,~ r'·""'..··"'-·,,· j :. :1 ¡ ¡ ! ø 1 I,V. ./ ~ -, : ,., ~ NOTE.-There were ___u_uoo_119-mm_____________m runs or sales of oil; _c_______umJ~_o_m__C___h__m_u__u_~ M cu. ft. of gas sold; ..___n___u_~?_h___u__oo_oo__oo_________ runs or sales of gasoline during the month. (Write "no" where applicable.) NOTFJ.-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Fonu 9-329 (January 1950) 16-25766-9 u. S. ~OYE:RNMEHT PAINTING OFFICt /.. ·::'.~d·-·' [2. (~~ n. ,V1 ~ , IE, l!fll.:::J U... L'.:J J . AUG 15 1962 LAND OFFICE __~çJ"!?~?.:g~m__.._.._.._ l£AS£ NUMBE~.9-?~2!__m________.m_._. UNIT .__..n_nM~l:~~p.?:g?:_..__.m_.__. Icy Bay-Cape Fairweather Area ~ Cn'ì~";Tat;nn 'LESfSFR'S MONTHLY REPORT OF OPERA TIONS,--~·,_··..~......._~ us ('I:'()~' ()r".-' \ '~uit'YE.T· 1 ,'.! ·u· -r l'i' D ~ . .. '1_< -' ...~" ....:0 I 'j. ).1' _ ,- ). ..... -J ,01 Auchoragc, Absk:t j " .... 1 ¡' State m_.._Å1ªRÄ-ªoo.__.__.._.m Oounty .oot~J-':!~t.l?:tnYI!·J_?:g~___ Field ___.__..~?:I:?:~p.~g?:oo..=:f-::;~~~LL.L?--..!-.G-62.-.-- ! The lollowin~ is a correct report 01 operations and production (including ¡ij' 'an..1. T!lf?;~lf:9inrJ! wells) lor the month 01 _oo._.oo.___....m.__oo;[Wy..n___n_' 19_..~g _._..___.._m.._._.__._.__m.___.__m.h¥.____~~:__~:~:~~~:::~~J .I1tent· s address, ..... .._.._.m_¡_Q_Q_Q__I>.~JlX~X...çJg.þ.._ª1.:l~J_ªJ.Ilg C~mpany ~Çg1.(l§r? _~~.~/. tl§Z_.Q.~.f?.,c~_?..!:P._~__.n_ .._.._..__...__..._.._.____...._._._.__n_.P-~m:y'ªr..).-.ºº1ºr.ªª9.___.__00.___00..00 &tned u-.oo··rl·,· ~~"]õ)~e:."'''''~&~~---, Phone ._.m..______m.__.____m___.Aººillª._g.':191J.oo.___.._.m___________00_ ' .I1tent's title m~;c-e:·P~~5~~:~t··---oo---n...----.--.. GALLONS or DARRELS or REMARKS BEC. AND Twr RANGE WELL DArB BARRBUI OJ' On. GRAVITY Cu. FT. or GAS GASOLINE WATER (If (If drilling. depth: II .hu' down. c..,..: J( OJ' " . No. PaODQCDD (In thousands) RECOVERED none, so state) date and r::~::n0t.f :r;~)r 1!1!1oline m~ '\. ~.. UNITED STATES _'J,j.J~ ./)£PARTMENT OF THE INTERIOR _ '( \/ GEOLOGICAL SURVEY Budget Bureau No. 42-R356.ð. Approval expires 12-31-00. --- NE Sec. 31 24s 32E I-A -0- ,4 -~, .. -0- -0- -0- Drilled to 8305. Core No. 1, 4862- 4872) rec. 61. Core No.2) 6264- 6276} rec. 81. Core No.3) 7302- 7307} rec. 5 1 . Core No.4) 8395- 8305) rec. 101. NOrE: COrE s Nos. 1, 2) 3 and 4 y¡ere cut f,)r geological infcrmatiJn and con~aineë no shows Jf oil or gas. Ran Microlog and ~ipmeter at 54041. Ran IES log at 5531. Ran IES} Microlog, Dipmeter surveys at 8305. -....,.-.'.. '''~'^''1 ¡' "'-':'~""-'-': ~ T:' ,;' ~-) ~ ~ % \ .. ~ ~"L':: ,.' -; ~ \ Stuck drill pipe at 7535, depth of hole 8305, began fishing for stuck drill pipe. '. f!' :~ -..........-:-..... ...--.. ..-.."'.~."..... _'"''''''.''' .,,","\0 , NOTE.-There were m_________ITº~___.._.__~.._n___.__ runs or sales of oil; u_.___.un:N.Q.u._m._m__m..______.___ M cu. ft. of gas sold; : _.__n___m.__.__..ITº.u__.____.__._.__m runs or sales of gasoline during the month. (Write "no" where applicable.) NOTE.-Rcport on this forIn is required for each calendar month, regatdlêss of the Btatus of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. ~~~::r~-l~;¿~ 1&-2S76ð-8 u. I. GOVlitNMI"NT I'RINTING O.,'ICI I x -----r---- -----. ----- . ..._---,-'---- ----- ----- ¡ : i ....--.. L--_--L.-___ tOo_--- ; i :. : : : 0) ~ ""ŒOWC, I¡) Jù . JUL 16 l\Mž'B~~~IN TRIPLICATE) UNITED STATES ConscOË~l\~T. '~~'èltvlh9F THE INTERIOR U. s. GEOCUCIC;\l, '$01 , . Ancl:oragc, j~GLOGICAL SURVEY ~ JI'onn &-881a (Feb, 1951) Budgel Bureau No. 42-R3.SIJ.4. ApprovalexpJr<<s J2-3J-M. A.1'J.chorage Land Ollic. ____________.______h_.__._ Le... No. ___... _____02..Y-.9J.6_u___ Unit __¡~;y:__~~X__ç_1?_.P.~ _.f,?:~r.. weather - Malaspina I-A SUNDRY NOTICES AND REPORTS ON WELLS . , NOTICE OF INTENTION TO DRIll._h___________.._.______________ _h___ SUBSEQUENT REl'ORT .OF WATER SHUT-OFF______________h_______ .---- NOTICE OF INTENTION TO CHANGE PLANS______m___h_________ ______ SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING.___________u__ ___0. NOTICE OF INTENTION TO TEST WATER SHUT-OFFhm_h______ "ho. SUBSEQUENT REPORT OF ALTERING CASING____.__________________ _____. NOTICE OF INT,NTION TO RE-DRlll OR REPAIR WELl_h______ ____0. SUBSEQUENT REPORT OF RE-DRILlING OR REPAIR..__.___________ _____ NOTICE OF INTENTION TO SHOOT OR ACIDlZE_______________h_ _m__ SUBSEQUENT REPORT OF ABANDONMENT_____hn______m________ _____ NOTICE OF INTENTION TO PUll OR ALTER CASING.______m____ nh__ SUPPLEMENTARY WEll HISTORY _n___________m_________________. _____ NOTICE OF INTENTION TO ABANDON WElL______m_h________ _____. __CJU~.iug--s-~tting------------.-hnh-----------h-n--m"XX- ...-----...-----..-:.,-- ------.. -- --...... --..... -- -.. ¥................ ---- -_.. -- -- ---- --.. ........ ............. ........................ --.. ,.---- - ...-- - - ~ - - - - --- -- - - - ~ -- - - ~- - - -... -- - -... - -.- -- - - -- - - - ---- - ~ -.. -- _. (INPICATE ABOVE BY CHECK MARK NATURE OF REPORT. NOTICE. OR OTHER PATio) ____ _ ________ _____ _ h__h______________________ n__ _~~~l__.2________ t I 9 §_?__ Malaspina' ",,-_JNL ,~ JE 1 . . Well No. ___J:::I\.._______ is located __lQ27n ft. fro~line and ---330--- ft. fro~vpcline of sec. ____31____ NE/4 See. 31 T24s R32E CRM '- --- n --, -Ö{Bcë.-ãñ-j -Sèë: N õ:) -- ---- - - --- h_ ---(TwÏ>T - n___ - -- - - - (RBñië)-- ---- h__m -- - (MérlïÏiBn; --- --- - --- h__m__~ªJ:ª~..2~!l:ª__________ _______ _____ X ª~gtª:t;__Y.:i¡l_q,g~----------------h--- ___ Alªs.kª____L _______________________ (Field) (County or SubdivIsIon) (Slate or Territory) The elevation of the derrick floor above sea level is ---35------ ft. DETAILS OF WORK (State name. or and expected d.pth, to objectIve hnd.; .bow .¡z:ee, wefchh."and Jenctl1.. of propoa.ed ça.in,..; Indicate muddin..job., eem.nt- Inc þOlnb, and all other: impol"tant propoud work) Ran 55 jt.) 1704.5]1) 13 3/8" csg.) 48 Ib./ft." R-40" R-2" with combination float arid guide shoe, one centralizer. Cemented with 507 sx. reg. common. Csg. set at 1700' KB. .;.,.,_.f,........... t'·,,· t) -:t' 1.:;:) . "....~, ..'.~' ',' ...".,."','~,.-,.,...;.",..~~~ . ¡ i ~ ~ ~ 1 i ,JUt J ¡) EH:2 : ~ 1 - ; : \'/. J. i,i:', ,;/: Î .-."..- ~·''''''~'-~''A. ,.... "".,' '._.~.'""".....__,.. ~,~.,,",;'> ~......~ ,:"':0; J under.tand that thf. piA" of work ntu.t receIve .þpl"oyalln wrltlnc by the CeoJoclcal !:urvey before operation. may be eomrneneed. Company ____ _m__________C.oloradQ__@il__and__Gas__ Corporation_________________________________________n__________"______ Address __~____._lD00__Den.yeJ:'__ Cluh._Bldg______ ....-...----.....- -------... ---- -- --- ---..--- -.. ---- ---'" -- --..--- - - -- -... - - - ---- ----- By __~lzrpL'-..,.Æ~,,--------- J. R. Coleman Tit Ie ___Yicf: __Pre siden.t_________________u_______ _-_________ ________ ___nem':e.x:,. __Colorad 0 -___ -_.___ ------- GPO 862040 . . Budget Bur~8u No. 42-R3ÕG.5. Ao>proval expires 12-31-60. UNITED STATES LAND OFFICE _uAl.lçhQ:rªg~_u_________ \. V '/" DEPARTMENT ÖF THE INTERIOR LEASE NUMBER __Q.Z!J.9J.._9..__.________uu___ '\£-.1 l: ( \ ·t:/,· GEOLOGICAL SURVEY £~ÿ -Bäÿ:--~~~~-?¥lï~ë-ätïië-r . / Area. '. LESSEE'S MONTHLY REPORT OF OPERATIONS State --~~~~--____________n_u_ Oounty _I~}fE.:~§._'bu.Y:!..ll~z~___ Field ___~lª~-þina u_u_________________._____:______n___~____ The followinf! is a correct report of operations and production (includinf! drillinf! and producinf! wells) for the'month of u_________nn____;¡,~rJ...e.._______________, lrf¿_'?..u, ___uuu_______________n______u___u._n.__n.____________.u______u_u_ ß.f!ent's addres s _______uu__n_J:'ººº..P-~gy~!;uºJ.:g~_J~¡ª.&g,______ Denver, Colorado ---...__________________________________________________________________...___4___________________ P ho ne ___________n_ _____n___u________u!g.?~_.?.:.7.~I~_ ______nn _u______u G~mpany -::i:r¿~-ºj;J,--m!d--ºªI'l--ç'OJ:.:P-...u--- . &f!ned _.u 4nJ:~:è~~~-------------- ß.f!ent's title ---__Yic.enPre.sid.en-t_____________________ BEC. ANn UorU Tn RANGE ~~~ DAYI PaODt1cJCD BARRELS or 011, GRAVITY Cu. FT. or GAS (In thousands) GALl.ONS 01' OASOL~E RECOVERED BARRELS or W UER (If none, so state) REMARKS (If drilling. dept.h; If sbut down. cawe: date and Tluult of te;.t for Euoline content of ,OUI) ---- NE Sec. 31 24s 32E I-A -0- -0- -0- -0- -0..., I June 12, 8 :30AM " Spudded. Set 1704.53' of 13 ~ =t= Csg. at 1700, cement with 507 sx reg. cement. Drilled to 3579'. \/. 1. L;'" ','~l ~ t "j I t ." '..' .~.,!o.;..!: _ ~ .. .f.. ~ rn@~ow~ -m Jl ._.Y JUL 16 1962 r--I:;()[-; ;J ,jUL l\.~ I .>~-','--_.-.II" ".... ~'h ,,___<1,.....)~..:""""....,.,.."".......~. ComcnmUon D¡...¡:;ion U. s. GEOLOGIC.\L SUHVE\ Anchorage, Alaska ~ . ~ . NOTE.-Thcre were ____unm__uu_____________________ runs or sales of 011; __m___Un________u_nu__n.__________u_ M cu. ft. of gas sold, , _____n__u____m__m~ºn________________ runs or sales of g!\solinc during the month. (Write "no" where applicable;) NOTE.-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Form 9-329 (1anuary 1951J) 16-25766-8 U. S. GOVtANMEHT PRINTING OFFlC! r:':-l (:ro' ()~j1 lÜ~2·;_¡1E:.li. Drnsrc:~"' OF T'1;:~"~;~~) '~f' l~~¡¡..r~:l^LS :;ì ,.~ 9 ;.;; F r"~ ; r D /0.. V ë /'J U £: ^ ¡~; r.: ¡.' '-: ::' '\ ':' ::". ,.A., I,./'~' ~~ .~, (\ June OJ 1962 H".:. .J. R. Co lcmn.n, Vice !}rC9 ident Drillin3 ~~dProduction Color.nGo Oil $.;1.d Gag Corporation 1000 Denver Cluh Building Denver, Colorado Dcm: SJ.r: Pll.".:1.rJC be .r.dviÐcd th:1t: YCl!r t:;)pliCL1U.Ql1 for pcrmit to drill rcll No.. !'íhhu:pina Unlt" l·"f¡, Sec. 31, ~{'. 2l}S., R.32J::, Copper ¡Uver D &. H is approved provider! that it ~hv.ll be th.'illùd in ßCcorr1:m.cfJ ~¡Hh the prov'.s1.Qns {.Jct forth for lieU No. '!~lal[wp5,aa Unil;1f 1 in my letter dtitt:d Hnrdt 13, 1962 lmn:bh c'c: ÐQ11 ¡"~r::.e!~ J£',uee t\. nilli.,TI}í) R08CQQ E. nÚl H.ll. SQ;¡.rot.er Very truly yours, /1 ~R !J;!í1Ld¿// ;L0!/ä'è"Z D<mald D. nr~ce Chief, 1'0 tì:O lcutn l.\r <',he It b& f5Ql?Oßh lS 01) I'S:J VI (2 [ff) L -~ 'GD ,JUN 9 1962 1'<' S C01)¡;e;'v'lL" v. C,·, - 'd(y] p. . . 1:..0. I.O"1C·',. 'j\'1Sian A "t '\I Sv llelJaI';¡"" .. J, nVEl' òÜ, Alaska ~ '-&001":..,... r-·~·~Î()':i'l~'í)~'··'·""'~f· f ! 1" tf",.r,,· ¡ .IV:'I 1 l~:'lL 4. J I' L_,~!·)·~..,:~,·icr ~ , . ForrDc II-S31 D. (Feb. 1961) ~:, c]j ~@rnuw~ ~ (SUBMlJU W 'iJR1fg':f'TEY.') , ~!1I~~ti~?·i5~i;~\!r DEPA~J$1:£N1LOE[ (ftlJ:'SUR,,~fj lOR GEO~~(CÄ£;·S¡jRVEY Budget Bureau No. 42-R368.4. Approval expires 12-31~. <' . , I I î X -----r--- n___. -----. f -----r----- -----,-----. I I ----~gç.L.3.t--- I f I I I I I I . : ! : La"" Offic. __@ç_hºrªg~_____~_ Lea_ N... ._uQ2Y:SnQ_____m___ Unit _~_~fJ.E:!:g?:m_____m____ Icy Bay- Cape Fairweathe;r Area pg'P!"¡)~r.r· SUNDRY NOTICES AND REPORTS ON WELLS ,hU¡\)¡'\!~0t NOTICE OF INTENTION TO DRlll____________u__________.___.m_ _X___ SUBSEQUENT REPORT OF WATER SHUT-OFF.n_mm_______mm _____ NOTICE OF INTENTION TO CHANGEPLANS_m_n_____________m __m. SUBSEQUENT REPORT OF SHOOTING OR ACIDIZINGm____________ moo' NOTICE Of INTENTION TO TEST WATER SHUT-OfF________._____ ______ SUBSEQUENT REPORT OF ALTERING CASING______m__.___________ _____. NOTICE OF INT~NTION TO RE-DRllL OR REPAIR Wa.L______u_ _,____ SUBSEQUENT REPORT Of RE-DRILLING OR REPAIR____,__________ m__ NOTICE Of INTENTION TO SHOOT OR ACIDIZE__________________ ______ SUBSEQUENT REPORT Of ABANDONMENT___m_m_________m____ m._. / NOTICE Of INTENTION TO PUll OR ALTER CASING__..n._._____ ______ SUPPLEMENTARY WELL HISTORY____u__mm_____._______________ ___.:~ NOTICE OF INTENTION TO ABANDON WELL._____________________ ___n_ _____________________nn___u_____________"__________n_n___________u _u(.. :::'J ~.O .g:~ t~_· --__......__ ___.. __~_._ ____.. ___ w.. __ __........................ __ __............ _______ ___........ __... ___.. ............... ....... __... __.... ___ _..____...... __ ____.._..... __...... __... __.. __ __...... ___...... _____.... __ ___.. __...... ...... ..._. -..,.... i':...... :::.'. "") (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT. NOTICE. OR OTHER DATA) c, _.. /; .n______m________n__n_______m________m~~~__2_____________. J 9__?_~ ¡ ç. ! ¿3 Malaspina Unit IN} {E } , :ì ¡ ~-;) Well No. m____1A~__~__~ is located ~lQ21m It.lrom~~ tI> line and __~~33º~~ It.lrom W line 01 sec~ m3~J,m:: \1 ~ --~--ê~&~?ä~.i~~NõT---------- ------(~t~j"------m---(~~j"-m- ----m--~ri(f¡íûi)--------- ~.: ~S~:j __~ª~.P.j~mL_________________n___ n_mx..~)g).t.~t._.yJ1__lªgl?________h____U____ m .._n_!9:~~~~_m___________h_m__ '.' '..:,: ", (Field) (County or Subdivlslou) (State or Territory) , .. \ I :::~, . ,\ì. ..:" :< ~¡'~'-; i~~:,~ DETAILS OF WORK (;"~~ ¡::~ (State name. of and expected depth. to objective aand., ahow .Ize., wetghh.;and lanetha of propoaed e..lnC'J Indicate muddin. job., cement...'\\~Z·· CM"..': In. points, and .n other important propoaed work) r..t \. .....'..., :..}:' ;.:: ~-) ~: 1". I ';,...., \- .\ 2. Approximately 1700' of 13-3/8" OD surface casing cemented with 400 sacks~~ ~; .- The elevation of the derrick floor above sea level is _____ª-___ ft. 1. Approximately 60' of 18" ID conductor casing cemented to surface. 3. Should it prove desirable to drìll this well deeper and should intermediate casing be required) there will be 9000' of 9-5/8" casing available. 4. Should production casing be required) an adequate amoilllt of 5-1/2" is on hand for use. 5. This is an exploratory well projected to an approximate total depth of 8500'. There is insufficient information to predict depths of objective pay zone. I under. tend that thl. plan of work mu.t receive approval In wrlUnC by the Ceolol'fcal ~urv-ey ~efore operation. may be eO",mençed. Company __.. __J~_9_WWW_º__º~_lillIl__~__QºR~ºMTJº~__._____m_________________._.h_____.m__________n_____m__"______ Address _______mJ.QQQ__DgnY_E;!x__ QJ.1l.ÞcJ:?!J1Àg.JP.g ByJJZ~L~~, J. R. Coleman . Title Y ;i,ç~__J');~ _f?Jª~Ð~________n_______..__n_______ __m______ _______ __ ____lle1J.Y.:er: 1- __ G Ql Q J:: ªdQ__.. _ _ _________ ..-.....-...---..---.........--..------ --- --------- -------- -- ------- ---- - - - - --- - -- --- GPO 862040 ~ , ,.' . 1" ...., <::> Q 15 ~ . 6 5 I R31E ~ 11 \?,(~~UW~]) 01 J'JN 9 1962 10 II .., Comcrvation D1V1SJ("11 VE U S GEOLOGICAL st 1 . . Anchorage, Alaska -i( .:_ 025123 ~ 0249/5 /280ACS "--/) ~ 13 LIB ~ b -78.75 7 8 J 2560 ACS . I~ ':t '" ---, I I I . I I "L- t~ _j~_}~~~__j _2L_ I - \ / ('D. \ . ,- -~ I 1..--0250/5 I 025/22 ~ I I ~ ~~. ....J6~40 ACS I /92~ ACS ~ I I )/ L~/ ~ ~~ C 26 ¡ ~5 '~I 2t/'-- '~2 r/ I I I <;) I I I JÍ ...----:;7::. '/'" ~ 0 . ~~ I I Ir---! I I I I /~l~?./' I ~) I I J'v!l I I . I IJ --- -- ----)- I 9 · I I II 024~/~ ~lo 12560 ACS. ~ -. 48 AC~.. I I I JJ¡ ., I I~es".. ---111181 I _.' ~ ¡ i ::_!~-:~2t-i--!T-' ! ¡ i REC~IVE~ i i _ _ _ -L _ _ _ i _ _ _ -L HH'HH" ..HH'HHH'H. _ _R,32 E CR.M " L ftal PI 196~ L ì. rt 10 ~ '':t ~ ~ . - r - - r ~ - - - i - r - - i- - - :::A: - ß::h~ -,- - - .~ - - COLORADO OIL ANDQM$1Ct9~~Âfíbt¡'~'~"'~ ,s DENVER A101kœFfÀJÐt:> ot Nalu.a... ~ LOCATION PLA'T# lA WELL MALASPINA UNIT ICY BAY- CAPE FAIRW"EATHER AREA S.E. ALASKA 17 FEDERAL LANDS STATE LANDS D Œffi] SCAlf 1163,,6C