Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
191-086
STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG is o NII Is, Well Status: Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned RI Suspended ❑ 1b. Well Class. 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: Zero Developme m Exploratory LIService Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 7/2/2019 191-086 • 319-333 3, Address: 7. Date Spudded: 15. API Number: P.O. Box 196612 Anchorage, AK 99518-6612 7/11/1991 50-029-22187-00-00 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 7/26/1991 PBU F -a Surface: 3362' FSL, 2863' FEL, See. 02, T1 IN. R13E, UM 8 Ref Elevations KB 64.83 ' 17. Field/Pool(s): ' Top of Productive Interval: 3538' FSL, 3197' FEL, See. 34, T12N, R13E, UM _ fy, doof GL 35.73 BF 35.71 - PRUDHOE BAY, PRUDHOE OIL Total Depth: 3952' FR, 3534' FEL, See. 34, T12N, R13E, UM - 10. Plug Back Depth(MD/TVD): 18, Property Designation: 12465' / 8838' ' ADL 02827 23 9L 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 18. DNR A6prANum er: Surface: x- 651959 y- 5974883 Zone - ASP 4 13175'/ 9307' 87-035 TPI: x- 646229 y- 5980225 Zone - ASP 4 • 12. SSSV Depth (MD/FVD): 20 Thickness of Permafrost MD/rVD Total Depth: x- 645884 y- 5980632 Zone - ASP 4 None 1910'/ 1907' 5. Directional or Inclination Survey: Yes ❑ (attached) No RI 13. Water Depth, if Offshore: 21, Re-diftnateral Top Window Submit electronic and printed information Per 20 AAC 25.050N/q (f[ MSL) MD7rVD: N/A 22_ Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary DIL, BHC, CNL, GR 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER FT. GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" Conductor 32' 112' 32' 112' 13-3/8" 689 NT -80 31' 2755' 31' 2678' 17-1/2" 3790 w ft Arctic Set II 9-5/8" 40" L'801 .8028' 12461' 29' 8836' 12-1/4" 2760 cu m Class'G' 7" 29# t3Cre0 12195' 13175' 8655' 9307' 8-1/2" 296 w it Class'G' 24. Open to production or injection? Yes ❑ No m 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): GRADE DEPTH SET (MD) PACKER SET (MD/TV 4-1/2"12.6#13CB0 12257' 12071'/8572' 12170'18639' ,1 A r_ I I/ _ _ 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. D TE �Z2or1 Was hydraulicimeturing used during completion? Yes ❑ No El Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED VE IFIED 12496" Set Whipstock 12465' Set 2nd Whipstock 12465' 19 Bbls Cement 27, PRODUCTION TEST Date First Pmductom: Not on Production Method of Operation (Flowing, gas lift, etc.): WA Date of Test:Production Hours Tested:' for Oil -BEI: Gas -MCF: Water -Bbl: Cheka Sive Gas -Oil Ratio Test Period •y Flaw Tubing Casing Press: Calwiated Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity- API(com: Press 24 Four Rate y Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only TP6 L"On Ztt)4-+y 411 R4 (F RBDMS,�KNJUL 261019 ✓G 28. CORE DATA Conventional Corals) Yes ❑ No ® Sidewall Cores Yes ❑ NO 0 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed), Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29, GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top Well Tested? Yes ❑ No Permafrost - Base r If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 12464' 8838' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Sag River 12464' 8838' - Shublik 12533' 8884' , Sadlerochit - Zone 4 12648' 8961' , Formation at total depth: Zone 4 12648' 8961' 31. List of Attachments: Summary of Pre -Rig Work, Summary of Daily Drilling Reports, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Ciolkosz, Ryan R Authorized Title: SIM Sst Contact Email: Ryan.Ciolkosz@bp.com Authorized Signature: ate: 11(+/'l I Contact Phone: +1 907 564 5977 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item Ia. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Omer. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or welt test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Onlv (LRS Unit 76 Assist E -line with Load & Test) Travel to job location. Job postponed until next 6/14/2019 day. ***WELL SHUT-IN ON ARRIVAL*** (SLB E -LINE CONVEYED MILL) INITIAL T/I/O = 2300/300/ RIG UP E -LINE AND 3RD PARTY CRANE, TEST TOOLS WITH WELLTEC. FINAL T/I/O = 2300/300/ 6/14/2019 ***JOB CONTINUED ON 15 -JUN -19*** T/I/O = 2280/260/630. Temp = SI. TBG FL (Eline request). ALP = 320 psi, SI @ CV. OA cemented to surface. IA FL @ 12654' (Bottom perfs, 201 bbls). 6/14/2019 SV, WV, SSV = C. MV = O. IA, OA = OTG. 03:30 ***JOB CONTINUED FROM 14 -JUN -19*** (SLB E -LINE CONVEYED MILL) INITIAL T/I/O = 2300/250/600 PSI RIG UP, PT LUBRICATOR TO 350/3300 PSI LRS LOAD TUBING W/ 275 BBL CRUDE AT 5 BPM FOR MILLING OPERATIONS RIH W/ 1-32ZAXS/PEH-EF (1.375" FN)/CCL/WELLTEC MILL. OAL = 37', OAW = 540 LBS, MAX OD = 3.805" (MILL). TIE INTO TUBING TALLY DATED 10/21/2007. MILL SWN NIPPLE AT 12245', DRY DRIFT CLEAN. 6/15/2019 ***JOB CONTINUED ON 16 -JUN -1 9*** T/I/0= 2300/250/600 Temp=Sl Assist E -line with load and kill. (CTD) Bullhead 3 bbls 50/50, followed by 275 bbls crude down tbg. E line to RIH. E line still on well at LRS departure. DHD (Barry) notified about increasing OAP. FWHP=100/237/610 6/15/2019 T/1/0= 50/275/615 Temp= S/I (LRS Unit 70: Assist E -line: L&K/ CTD) Pumped 3 bbls of 50/50, followed by 290 bbls of KCL, along with a 38 bbl Diesel FP to load & kill TBG for SLB E -Line. SLB E -Line in control of well upon departure. CVs OTG. Tag hung on WV. Final WHP= 6/16/2019 0/185/650 ***JOB CONTINUED FROM 15 -JUN -19*-* (SLB E -LINE POSISET, CEMENT DUMP) INITIAL T/I/O = 100/250/600 PSI RIG UP, PT LUBRICATOR TO 350/3300 PSI LRS LOAD TUBING W/ 290 BBL 1% KCLAND 38 BBL DIESEL FP RIH W/ 1-32ZAXS/PEH-EF (1.375" FN)/CCL/MPBT/POST PLUG (H405501). DAL = 36', CAW = 200 LBS, MAX OD = 2.125". SETTING DEPTH = 12550', CCL TO MID ELEMENT = 23.2', CCL STOP DEPTH = 12526.8'. RIH W/ 40'X 2.125" BAILER. OAL = 53', OAW = 280 LBS, MAX OD = 2.125". DUMP 5 GAL OF CEMENT ON TOP OF PLUG AT 12550'. TOP OF MENT AT 12546.8'. TIE INTO SLB GAMMA RAY / CCL LOG DATED 26 -SEP -1991. 6/16/2019 ***JOB CONTINUED ON 17 -JUN -1 9*** Daily Report of Well Operations F-48 ***JOB CONTINUED FROM 16 -JUN -19*** (SLB E -LINE CEMENT DUMP AND WHIPSTOCK) INITIAL T/1/0 = 0/150/600 PSI RIG UP, PT LUBRICATOR TO 250/3500 PSI RIH W/ 1-32ZAXS/PEH-EF (1.1875" FN)/CCL/40'X2.125" BAILER. OAL = 53', OAW = 250 LBS, MAX OD = 2.125". DUMP 5 GAL (-3.2') OF CEMENT ON PLUG AT 12550', NEW TOP OF CEMENT = 12543. RIH W/ 1-32ZAXS/PEH-EF (1.1875" FN)/CCL/40' X 2.125" BAILER. DAL = 53', OAW = 250 LBS, MAX OD = 2.125" DUMP 5 GAL (-3.2') OF CEMENT ON PLUG AT 12550', NEW TOP OF CEMENT PLUG = 12540' RIH W/ 1-32ZAXS/PEH-EF (1.1875" FN)BKR 10/BKR WHIPSTOCK. DAL = 50', OAW = 650 LBS, MAX OD = 3.63". SIT DOWN AT -11300% WORK TOOLS UP AND DOWN AND UNABLE TO PASS --11400'. ATTEMPT TO POOH, TOOLSTRING STUCK AT 11050'. PREP TO PUMP KCL W/ SAFELUBE IN THE MORNING 6/17/2019 ***JOB CONTINUED ON 18-JUN19*** T/I/O=Vac/264/629 Temp=Sl Assist E -line as dirested (CTD). Road unit to location/ Rigged up, pressure tested. SB for E -line (E -line timed out) 6/17/2019 *** WSR continued on 06/18/19 *** ***JOB CONTINUED FROM 17 -JUN -19*** (SLB E -LINE WHIPSTOCK SETTING) LRS PUMP DIESEL FOLLOWED BY 1% KCL W/ SAFE LUBE TO ATTEMPT TO FREE TOOLSTRING. TOOLSTRING STILL STUCK AFTER PUMPING, ATTEMPT TO SET WHIPSTOCK FAILED. TOOLSTRING BECAME FREE WHEN ATTEMPTING TO BREAK WEAKPOINT. POOH WITH HEAVY TENSION SWINGS. AT SURFACE, FIND THAT THE BURN CHAMBER ON THE SETTING TOOL HAD FLOODED CAUSING THE SLIPS ON THE WHIPSTOCK TO ENGAGE. RDMO E -LINE UNIT. 6/18/2019 ***JOB COMPLETE, WELL LEFT SHUT-IN ON DEPARTURE*** *** WSR continued from 06/17/19*** Assist E -Line (Stuck in hole) Pumped a total of 3 bbls of 50/50 followed by 292 bbls 1 % kcl(safelube) followed by 76 bbis DSL to get E -Line free. 6/18/2019 SEL on well @ departure. FWHP= -3/220/666 T/l/O = Vac/2/620. Temp = SI. Bleed WHPs (Pre RIG). No AL, wellhouse or flowlines. IA FL @ near surface. OA cemented to surface. Bled OAP to BT from 620 psi to 0 psi in <5 min (Gas to thick dark fluid). OAP increased 22 psi in <5 min. Bled OAP to 0 psi and held open OA bleed for 30 min. Bled IAP to 0 psi iin 1 min. Monitored for 30 min. OAP increased 130 psi. Final WHPs = Vac/0/130. 6/22/2019 SV, WV, SSV = C. MV=O. IA, OA = OTG. 21:15 T/1/0=0/0/0 PRE CDR2 R/U CIW lubricator #839 w/ 4" H plug. PT'd lubricator low 300psi, High 3500psi. Set 4" H TWC #294 @ 130" bottom of window. Perormed LTT on TWC. R/D CIW lubricator. Removed SV & WV platforms. R/D production tree & installed CDR tree # 8. Torqued CDR tree to 886 It lbs. Installed CDR target 90#4. Torqued targert 90 x FC to 675 It lbs. R/U CIW lubricator # 839 w/ H plug pulling tool. PT'd CDR tree & target 90 against my gate Low 300psi. Hight 5000psi. Pulled 4" H TWC #294 @ 130" bottom of window. R/D CIW lubricator. Installed test spool #2 on top of SV. PT'd test spool against SV gate low 330psi, 6/25/2019 1 High 5000psi. RDMO ***Job Complete' FWHP= 0/0/0 Daily Report of Well Operations F-48 TWO = Vac/Vac/80. Temp = SI. WHPs (Pre Rig). No AL, SSV, Flowline or wellhouse. Downcomer installed on the flow cross. OA cemented to surface. Bled the OAP from 80 psi to 0 psi in 1 second (all gas). The OAP increased 36 psi in the 30 minute monitor (re-bled before departure). FWPs = Vac/Vac/0. 6/28/2019 SV, MV = C. IA, OA = OTG. 14:30 TWO = VAC/VAC/600. Temp = SI. Bleed WHPs (Pre RIG). No wellhouse, flowline or scaffolding. CDR tree installed. Bled OAP from 600 psi to 0 psi in 1 minute. Held open bleed on OA for 1 hour prior to rig pulling on well. Final WHPs = VAC/VAC/O. 6/30/2019 JCDR in contorl of well upon departure. 06:30 North America -ALASKA - BP Operation Summary Report Page i 9>1 - Common Well Name. F-48 AFE No Event Type: RE -ENTER -ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-Q (2,778 074 00 ) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Daterrime: 7/11/1991 12:00 OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. 8PUO1: USA00000765 Active datum: KB @64.83ustt (above Mean Sea Level) Date From - To Hra Task Code NPT Total Depth Phase Description or Operations (hr) (usR) 6/30/2019 0230 - 0630 4.00 MOB P PRE RIG IS RELEASED FROM C-19CAT 0230 PREP FOR RIG MOVE AND PULLING OFF WELL. PJSM WITH PEAK AND NABORS CREWS THEN PULL OFF C-19. MOVE RIG TO F -PAD. _ 0630 - 0800 1.50 MOB P PRE ARRIVE F -PAD. REMOVE JEEPS FROM BOTH MODULES. MOVE SUB INTO POSITION TO PULL OVER THE WELL. _ 0800 - 0930 1.50 MOB P PRE UNHOOK THE TRACTOR AND HOOK UP THE WALKER. USE THE WALKER TO SPOT THE SUB THE FINAL DISTANCE OVER THE WELL. REMOVE THE WALKER AND SET THE SUB DOWN. 09:30 - 15:00 5.50 MOB P PRE SPOT THE PIT MODULE AND SET IT DOWN. ACCEPT RIG AT 10:30. CONDUCT PJSM FOR RIG UP CHECKLISTS. COMPLETE RIG UP CHECKLISTS. SPOT TIGER TANK AND AUXILLIARY EQUIPMENT. LTT ON TREE VALVES THEN REMOVE TREE CAP AND INSTALL BOPS. 15:00 - 18:30 3.50 RIGU P PRE SERVICE TREE VALVES. WU INJECTOR. VALVE CREW VERIFIED TORQUE CIRCULATE FRESH WATER FORWARD TO _FILL REEL. 18:30 - 20:00 1.50 RIGU P PRE TEST BOTH VISUAL AND AUDIBLE LELALARM 5% / 40% AND H2S ALARMS AT 5 PPM / 10 PPM GOOD TEST PERFORM SHELL TEST TO 4000#. TROUBLESHOOT. C13 OR C14 LEAKING. (ISOLATION VALVES FOR C9 IC10 BACKWARDS TEST) CONTINUE WITH ROPE TEST 20.00 - 00'.00 4.00 BOPSUR P PRE INITIAL BORE TEST TO BOTH BP I AOGCC REQUIREMENTS WITNESS WAIVED BY AOGCC MATT HERRERA 7-1/16" ANNULAR, BUND/ SHEAR, 2-3/8" PIPE -SLIP, 2-3/8" z 3.5" VARIABLE PIPE RAM, 2-3/8" PIPE -SLIP ALL TESTS WILL BE 250 PSI LOW / 3500 PSI HIGH HELD FOR 5 MIN EACH - TEST 1: IRV, RACKOFF PASS -TEST 2: BLIND/SHEAR, R1, BL1A, B1, B4 PASS - TEST 3: ANNULAR (2-3/8") TIW#1, B3, B2, BL1 PASS - TEST 4: UPPER 2-3/8" PIPE -SLIP, TIW#2, BL2, R2, T2, C15 PASS - TEST 5: C16, Ti, C11 PASS - TEST 6: VARIABLES (2-3/8"), C7, C9, C10, TV2. TVI LEAKING BY ON LOW. BLEED PRESSURE OFF. SERVICE VALVE Printed 7/25/2019 9:34:OOAM **All depths reported in Drillers Depths" NorthAmerica- ALASKA - BP Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/2112019 X3-019CR-C: (2,778,074.00 ) Project: PBU Site: F Rig Name/No.: CDR -2 Spud DateTme: 7/11/1991 12:00 OOAM Rig Release: 7/21/2019 Rig Contractor. NABORS ALASKA DRILLING INC. BPUOL USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 7/1/2019 00:00 - 03:30 3.50 BOPSUR P PRE INITIAL BOP TEST TO BOTH BP/AOGCC REQUIREMENTS WITNESS WAIVED BY MATT HERRERA CONTD 7-1116" ANNULAR, BLIND/ SHEAR, 2-3/8" PIPE -SLIP, 2-3/8" x 3.5" VARIABLE PIPE RAM, 2-3/8" PIPE -SLIP ALLTESTS WILL BE 250 PSI LOW / 3500 PSI HIGH HELD FOR 5 MIN EACH -TEST 6: VARIABLES (2-3/8"), C7, C9, CIO, TV1. TV1 LEAKING BY ON LOW. BLEED PRESSURE OFF. SERVICE VALVE. TV1 STILL LEAKING. ISOLATE AND CONTINUE WITH TEST -TEST 6: VARIABLES (2-3/8"), C7, C9, C10 PASS - TEST 7: LOWER 2-3/8" PIPE -SLIP, C5, C6, C8, TV2 PASS -TEST B: CHOKE A, CHOKE PASS -ACCUMULATOR DRAWDOWN TEST REPLACE FAILED TV1 '- TEST 9: ANNULAR (3-1/2"), Cl, C4, TEST REPLACEMENTTV1 PASS -TEST 10: VARIABLES (3-1/2"), C2, C3 PASS I- SERVICE TEST C14 PRIOR TO TESTING C91 C10 BACKWARDS. STILL LEAKING. REBUILD C-13 03:30 - 04:00 0.50 BOPSUR P PRE SIMOPS: BHI INSTALLED FLOATS/TESTED TO 4000#, GOOD TEST 0400 - 0600 2.00 BOPSUR P PRE FLUID PACK FOR C9 C10 BACKWARDS TEST - TEST 250 PSI LOW 13500# HIGH. GOOD TEST INSTALL DRILLING RISER. 06:00 - 06:30 0.50 KILLW P PRE CONDUCT RIG EVAC DRILL WITH WARD CREW. ALL PERSONS MUSTER AND ACCOUNTED FOR IN 3 MIN, CONDUCT AAR FOLLOWED BY F-48 PRE -SPUD. 06:30 - 08:30 2.00 KILLW P PRE LINE UP VALVES AND PT DRILLING RISER, GOOD. FILL REEL WITH MUD. _ 08'.30 - 10:00 1.50 KILLW P PRE CALIBRATE OUT MM WITH FRESH WATER. BUILD 50 BBLS HI -VIS MUD FOR BULLHEAD. CONDUCT PJSM FOR BULLHEADING WELL 10:00 - 12:30 2.50 KILLW P PRE BULLHEAD WELLAT 5 BPM. PUMP 5 BBLS MEOH 270 BBLS KCL 50 BBLS HI -VIS MUD 147 BBLS MUD FINAL PUMP PRESSURE IS 1060 PSI. 1230 - 1300 0.50 STWHIP P WEXIT SHUT DOWN PUMP, ALLOW PRESSURE TO BLEED OFF. PURGE RISER OUT TO TIGER TANK BRING RETURNS BACK INSIDE, 10 MIN LOSSES IS 6.4 BBLS. PJSM FOR PICKING UP WHIPSTOCK BHA. Printed 7/25/2019 9:34:OOAM "All depths reported in Drillers Depths" North America - ALASKA- BP Operation Summary Report Common Well Name: F-48 BPUOI: USA00000765 Event Type: RE-ENTER- ONSHORE (RON) Start Date- 6/30/2019 End Date. 7/21/2019 Project: PBU Site. F Rig Name/No.: CDR -2 Spud Date/Time. 7/11/1991 12:O0 00AM AFE No (3-019CR-C: (2,778,074.00 ) Page 3 o17M6 Rig Contractor: NABORSALASKA DRILLING INC. Active datum: KB @64.83usft (above Mean Sea Level) BPUOI: USA00000765 Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) 13:00 - 73:30 0.50 STWHIP P WEXIT MAKE UP WHIPSTOCK BHA#1 - SURFACE TESTED COILTRAK TOOL. GOOD TEST. - PRESSURE TEST QTS TO 3500 PSI HIGH FOR 5 MINUTES -INJECTOR ON: 13:35 1330 - 1400 0.50 STWHIP P WEXIT LOG DOWN FOR TIE-IN FROM 12445' _ (FORMATION) WITH -25' CORRECTION 1400 - 1830 4.50 STWHIP P 12,496.00 WEXIT RIH WITH WHIPSTOCK BHA#1. - RATE: 0.98 BPM IN, 0.55 BPM OUT. CIRC PRESSURE: 1100 PSI '- MUD WEIGHT: 8.53 PPG IN, 8.44 PPG OUT - WEIGHT CKAT 12400' IS 60K. -LOG GR TIE IN WITH -25' CORRECTION. - LOG CCL LOG. COLLARS CAME IN ON DEPTH WITH SLB CBT LOG DATED 09 -SEPT -1991 - SET TOP OF WHIPSTOCK AT 12496' @ 30° -PICK OFF WHIPSTOCK AND PAINT WHITE FLAG AT 12439.191(12,359- EDP) '- ATTEMPT TO BRING UP TO DRILLING RATE. 100% LOSS RATE. 18:30 - 22:00 3.50 STWHIP P 12,496.00 WEXIT POOH ON LOSSES - MUD WEIGHT: 8.51 PPG IN, 8.49 PPG OUT - RATE: 0.54 BPM IN, 1.04 BPM OUT PUMP 1 DOWN COIL, CHARGE PUMP DOWN KILL LINE -PERFORM 10 MIN FLOW CHECK, FILL WELL, STATIC LOSS RATE AT SURFACE -12-15 BPH. 22:00 - 00:00 2.00 STWHIP P 12,496.00 WEXIT PJSM, - LAY DOWN WHIPSTOCK SETTING BHA - MAKE UP WINDOW MILLING BHAAND STAND -BACK. - PREPARE FOR DIAMOND SEAL TREATMENT. - F-48 PRESPUD WITH ROY CREW 7/2/2019 0000 - 01:00 1.00 STWHIP N 12,496.00 WEXIT PJSM WITH INCOMING CREW -RUN THROUGH VALVE ALIGNMENT AND HOW WE WILL PULL THE LCM. 01:00 - 02:00 1.00 STWHIP N 12,496.00 WEXIT PUMP 16 PPB DIAMOND SEAL PILL - MIX AND PUMP 46 BBLS OF DIAMOND SEAL ONCE ALL PRODUCT DUMPED - 20 BBLS FRESHWATER - 154 BBLS OF 8.6 PPG QD-N. - PUMPED AT 5.5 BPM @ 1500# TILL WITHIN 20 BBLS OF PERFS. - SLOW RATE TO 2 BPM @ 1184#. ONCE DIAMOND SEALAT PERFS. PRESSURE GRADUALLY BUILDING TO 1700# WHILE WE -PUSHED HALF THE PILL INTO PERF. STARTED BACKING RATE DOWN TO 1 BPM AS PRESSURE CONTINUED TO CLIMB. - FINAL PRESSURE WAS 1 BPM Q 1645# -SHUT PUMP DOWN. Printed 7/25/2019 9,34:OOAM "All depths reported in Drillers Depths" Printed 7/25/2019 9:34:OOAM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 4 005 Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Dale'. 613012019 End Dale: 7121/2019 X3-019CR-C: (2,778,074 00 ) Project PBU Site'. F Rig Name(No.: CDR -2 Spud Date/Time: 7/11/1991 12:OO:OOAM Rig Release: 7/21/2019 Rig Contractor NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83us6 (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) lust) 02:00 - 03:30 1.50 STWHIP N 12496.00 WEXIT 1HR SOAK PRESSURE SLOWLY FALLING FROM 1645# TO 173# -CLOSE IN MPD. EQUALIZE. OPEN SWAB. - COME ONLINE AT 0.5 BPM. PRESSURE UP TO 650#. IMMEDIATELY. - DISCUSS WITH ODE. NOT WANTING TO GO ANY HIGHER. BLEED PRESSURE OFF. CIRCULATE ACROSS TOP TO ACCESS LOSS RATE. LOSSES HEALED TO 1:1.- :1.03:30 03 30- 04:30 1.00 STWHIP P 12,496.00 WEXIT MONITOR WELL FOR 10 MIN FLOW CHECK. WELL STATIC -MAKE UP WINDOW MILLING BHA - INJECTOR ON AT 04:15 - TEST QTS TO 3500# GOOD TEST 04:30 - 07:00 2.50 STWHIP P 12,496.00 WEXIT RIH - OAS BPM IN RATE / 0.98 BPM OUT RATE -8.53 PPG IN /8.52 PPG OUT 07:00 - 09:00 JI Y/1 2.00 STWHIP P 12,501.00 WEXIT STOP AT FLAG AND CORRECT -31.2'. RIH DRY, TAG AT 12497', START MILLING WINDOW. AT PINCH POINT F-q�A RESET DEPTH TO 12501.3'. MILL 3.8" WINDOW IN 7" CASING PER BAKER REP FROM 12501.3' MD TO 12502.3' MD - RATE: 2.83 BPM IN, 1.18 BPM OUT - MUD WEIGHT: 8.60 PPG IN, 8.47 PPG OUT -DWOB: 1-3 KLBS - CIRC PRESSURE: 3310 PSI -ECD =10.57 PPG 09.00 - 16 20 7 33 STWHIP P 12 501.00 WEXIT CONTINUE MILLING WINDOW AT 12502.3'. BIG SLUG OF DIAMOND SEAL COMES BACK OVER SHAKER. ANNULAR PRESSURE AND ECD DROPAFTER WELL CLEANS UP. RETURNS BETTER. MILL 3.8" WINDOW IN 7' CASING PER BAKER REP FROM 12502.3' MD TO 12510.5' MD. - RATE: 2.85 BPM IN, 2.12 BPM OUT - MUD WEIGHT: 8.57 PPG IN, 8.50 PPG OUT - DWOB: 1 -4.6 KLBS - CIRC PRESSURE: 3030 PSI - ECD =9.90 PPG - AT 12505.6' DWOB FALLS OFF TO 0.5K. CONTINUE TIME MILLING SCHEDULE. - REDUCE PUMP RATE TO 2.67 BPM TO HELP WITH VIBRATION. I- 12508' SAMPLE HAS 10% FORMATION. 16:20 - 18:00 1.67 STWHIP P 12,501.00 WEXIT MILL RATHOLE FROM 12510.5' TO 12519'. PUMP 5 BBL$ LO/ HI VIS SWEEPS AROUND. ROP IS 20 FT/HR WITH 2.5K DWOB. 2.70 / 2.36 BPM WITH 8.55 / 8.48 PPG IN / OUT. CONDUCT REAMING PASSAT 1 FT/MIN. UP, DOWN, UP, NOTHING SEEN. DRY DRIFT TO 12519' IS CLEAN, SOLID TAG. PICK UP ABOVE WHIPSTOCKAND DYNAMIC FLOW CHECK, GOOD 1.0 / 0.77 BPM FOR 10 MIN. 18.00 - 2030 2.50 STWHIP P 12,501.00 WEXIT MONITOR WELL FOR 10 MINUTES: STATIC - MUD WEIGHT: 8.54 PPG IN, 8.47 PPG OUT - RATE: 2.61 BPM IN, 2.00 BPM OUT Printed 7/25/2019 9:34:OOAM **All depths reported in Drillers Depths" Printed 7/25/2019 9:34:OOAM **All depths reported in Drillers Depths" North America - ALASKA- BP Page 5 Operation Summary Report Common Well Name. F48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date 6/30/2019 End Date. 7/21/2019 X3-019CR-C. (2,778,074.00 ) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time. 7/11/1991 12:00:00AM Rig Release: 7/21/2019 Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Him Task Code NET Total Depth Phase Description of Operations (hr) (usft) 20:30 - 22:00 1.50 STWHIP P 12,501.00 WEXIT MONITOR WELL FOR 10 MINUTES AT BHA: STATIC -CLOSE EDC, POWER DOWN -INJECTOR OFF: 20:30 -LAY BHA DOWN. _ 22:00 - 00:00 2.00 DRILL P 12,501.00 PROD? RIH WITH 4-1/4" DRILLING BHA#3 - RATE: 0.99 BPM IN, 1.08 BPM OUT. CIRC PRESSURE: 1001 PSI MUD WEIGHT: 8.51 PPG IN, 8.48 PPG OUT 7/3/2019 00:00 - 01:30 1.50 DRILL P 12,519.00 PROD? .RIH WITH 4-1/4* DRILLING BHA#3 - RATE: 0.99 BPM IN, 1.08 BPM OUT. CIRC PRESSURE: 1001 PSI -MUD WEIGHT: 8.51 PPG IN, 8.48 PPG OUT - LOG DOWN FOR TIE-IN FROM 12,500' TO 12536.2' MD (FORMATION) WITH -27' CORRECTION - DRY TAG BOTTOM. PU AND RECORD PARAMETERS _ 01:30 - 0430 3.00 DRILL P 12,556.00 PROD1 DRILL 4-1/4" BUILD FROM 12,519' MD TO 12,558'MD - FREE SPIN: 3234 PSI, 2.80 BPM - RATE: 2.80 BPM IN, 2.44 BPM OUT. CIRC PRESSURE: 3267-3413 PSI . -MUD WEIGHT: 8.59 PPG IN, 8.50 PPG OUT, ECD: 9.75 PPG AT WINDOW - ROP: 10-20 FT/HR, WOB: 1.5 -3.0 KLBS. 0430 - 17'.30 13.00 DRILL P 12,970.00 PROW DRILL 4-1/4" BUILD FROM 12,558' MDTO - FREE PIN'. 320171'SI, 2.86 BPM - RATE: 2.86 BPM IN, 2.77 BPM OUT. CIRC PRESSURE: 3200-3420 PSI -MUD WEIGHT: 8.61 PPG IN, 8.56 PPG OUT, ECD: 9.94 PPG AT WINDOW -ROP: 30-60 FT/HR, WOB: 1.5-3.0 KLBS. -AT 12670 PULL 150' WIPER, CLEAN PASS UP AND DOWN. -AT 12730' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. - AT 12820' PULL 150' WIPER, CLEAN PASS UP AND DOWN. - ROP SLOWS TOWARD 12950', DRILLING BACK UP THROUGH THE HARD SPOT ENCOUNTERED EARLIER JUST OUTSIDE THE WINDOW. -AT 12960' PUMP 5 BELS LO / HI VIS SWEEPS, PREP FOR LONG WIPER. Printed 7/25/2019 9:34:OOAM **All depths reported in Drillers Depths" North America - ALASKA - SP Operation Summary Report Common Well Name: F-48 AFE No Event Type- RE-ENTER- ONSHORE (RON) Stan Date: 6/30/2019 End Date: 7/212019 X3-019CR-C: (2,778,074,00) Project: PBU Site: F Page 6 alf* Rig Contractor: NABORSALASKA DRILLING INC. Active datum: KB C64.83usR (above Mean Sea Level) BPUOI: USA00000765 Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 1730 - 21'45 4.25 DRILL P 12,970.00 PROD1 PERFORM LONG WIPER TRIP TO WINDOW FROM 12970' MD - RATE: 2.86 BPM IN, 2.65 BPM OUT. CIRC PRESSURE: 3280 PSI .- OVERPULLAT WINDOW OF -3.5K JOG BACK IN AND PULL BACK THROUGH CLEAN. -OPEN EDC WITH BITABOVE WINDOW -ATTEMPTTO JETTRAY, SETTING DOWN 5-8K ATTOP OF OF WHIPSTOCK CHANGE ORIENTATION AND ATTEMPT TO PASS THROUGH WITH PUMPSAT2.16 BPM, TURN OFF PUMPS WITH MOTOR ORIENTATED AT 30L PASS THROUGH TOP OF WHIPSTOCK BUT HANG UP AT 12506' ATTEMPT TO WORK THROUGH AT DIFFERENT ORIENTATIONS AND PUMP RATES NOTABLE TO PASS THROUGH, CONTINUE WIPER TRIP TO 12000 AT 3.8 BPM THROUGH OPEN EDC. - RUN BACK IN HOLE TAG UP ON X NIPPLE AT 12045 CHANGE ORIENTATIONS WITH NO SUCCESS, SET DOWN 5KAND ROLL OREINTATOR AND PASS THROUGH AT 20L. SET DOWN ON X NIPPLE AT 12090' SET DOWN SKAND ROLL ORIENTATOR AND PASS THROUGH, SET DOWN 5 K ON SWS NIPPLE AT 12245' AND ROLL ORIENTATOR AND PASS THROUGH. SET DOWN 5K ON TOP OF WINDOW AND ROLL OREINTATOR WITH NO SUCCESS. PICK UP CLEAN AND CLOSE EDC, PUMP AT 1 BPM TO ROLL BIT, TURN OFF PUMP AND ATTEMPT TO PASS THROUGH WINDOW. PICK UP PUMPAT 0.75 BPM TO TIGHT SPOTAND TURN OFF PUMPSAND ROLL ORIENTATOR WITH NO SUCCESS. -DISCUSS OPTIONS WITH ODE AND ACTING FIELD SUPERINTENDENT AND DECIDE TO PUMP SWEEPAND POOH FORA WINDOW _ DRESSING RUN. _ 21:45 - 00:00 2.25 DRILL N 12,970.00 PROD1 PUMP 10 X 10 BBL LOW/HI VIS SWEEPAND POOH PUMP AT 3.8 BPM AT 3480 PSI STATIC FLOW CHECK FOR 10 MINUTES PRIOR TO REACHING BHA -NO FLOW 7/4/2019 01:00 - 04:00 3.00 DRILL N 12,970.00 PROD1 PH WITH 3.80° WINDOW DRESSING BHA 94 - RATE: 0.51 BPM IN ,0.98 BPM OUT. CIRC PRESSURE: 885 PSI - MUD WEIGHT: 8.60 PPG IN, 8.58 PPG OUT - LOG DOWN FOR TIE-IN FROM 12,400' TO 12454.88' MD (FORMATION) WITH -31' CORRECTION - DRY TAG AT 12503'CLOSE EDC. PU AND RECORD PARAMETERS Printed 7/252019 9:34:o0AM ""All depths reported in Drillers Depths" Printed 7/252019 9:34:00AM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 76ras Operation Summary Report Common Well Name: F-48 AFE No Event Type. RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00 ) Project. PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12.00:00AM Rig Release: 7/21/2019 Rig Contractor: NABORSALASKA DRILLING INC. _ BPUOI: USA00000765 _ Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations __. _ _. (hr) (usft) 04:00 - 06:00 2.00 DRILL N 12,970.00 PROD? DRESS WINDOW PER BAKER REPAND OCN #3 - RATE: 2.87 BPM IN, 2.75 BPM OUT - MUD WEIGHT: 8.67 PPG IN, 8.59 PPG OUT -DWOB:1-4.6 KLBS -CIRC PRESSURE: 3019 PSI - ECD = 10.10 PPG - MILUDRESS AT 1 FPM FROM 12498' TO 12511' -OBSERVE 40-60 PSI MOTOR WORK AT 12503, 12507 WITH NO INCREASE IN WOO - PULL UP TO 12498' MILUDRESS AT 1 FPM . FROM 12498' TO 12511 X 3 MILLING UP AT 210 DEGREES, 60 DEGREES AND O DEGREES - DRY DRIFT THROUGH WINDOW IS CLEAN, TAG AT 12517' FORMATION. BRING PUMPS UP TO 2.6 BPM, WASH DOWN TO 12519' WITH __ NOTHING SEEN. 06:00 - 09:00 3.00 DRILL N 12,970.00 PROD1 PICK UP ABOVE WINDOWAND DO 50'JOG. OPEN EDC, FLOW CHECK WELL. NO FLOW POOH. PUMP 3.8 BPM / 3550 PSI. REBEND MOTOR OFFLINE WHILE POOH, - BUILD BHA #5. _ 06:16 - 07:16 1.00 DRILL IN 12,970.00 PROD? ,SWAP BHA'S -CHECK LAST 80' OF COIL FOR DAMAGE -GOOD -INJECTOR OFF AT 0025 HRS -STAND BACK BUILD BHA -RIH FROM DERRICK WITH WINDOW DRESSING BHA -MAKE UP INJECTOR AND TEST OTS TO 3500 PSI -GOOD -INJECTOR ON AT 0050 HOURS 09:00 - 10:00 1.00 DRILL N 12,970.00 PROD1 MONITOR WELL FOR 10 MINUTES AT BHA: STATIC - CLOSE EDC, POWER DOWN - INJECTOR OFF: 09:05. - INSPECT LAST 80' OF CT, NOTHING SEEN. - BOTH MILLAND REAMER 3.80 GO, 3.79 NO-GO. MAKE UP 4.25" DRILLING BHA#5 - PICK UP 2-7/8" ULS MOTOR (2.3 DEG AKO) AND 3" COILTRAKTOOLS - MAKE UP 4.25" HYC BICENTER BIT - SURFACE TESTED COILTRAK TOOL. GOOD TEST. - PRESSURE TEST OTS TO 3500 PSI HIGH FOR 5 MINUTES INJEC_T_OR ON: 09: 40. 10:00 - 13:00 3.00 DRILL N 12,970.00 PRODi RIH WITH 4.25" DRILLING BHA #5 - BREAK DOWN BHA #4 OFFLINE WHILE RIH. - RATE: 0.52 BPM IN, 0.97 BPM OUT. CIRC PRESSURE: 955 PSI - MUD WEIGHT: 8.59 PPG IN, 8.58 PPG OUT - LOG DOWN FOR TIE-IN FROM 12410' MD (FORMATION) WITH -25' CORRECTION. Printed 7/252019 9:34:00AM **All depths reported in Drillers Depths" Common Well Name: F-48 Event Type: RE-ENTER- ONSHORE(RON) North America - ALASKA - BP Operation Summary Report Start Date'. 6/30/2019 End Date. 7/21/2019 AFE No (2,778 074 00 ) Page Bg)i4 Project: PBU Site: F Rig Nama/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft)_ 7300 - 1540 2.67 DRILL P 12,970.00 PROD1 CLOSE EDC. 15:40 17:30 1.83 17:30 - 18:15 0.75 PASS THROUGH WINDOW AT 30R, 20 FT/MIN, 0 PUMP WITH NO ISSUES. AFTER 12900' HAVING TROUBLE GETTING BACKTOBOTTOM. STACKING WEIGHT AND HAVING TO WASH DOWN. - PULL WIPER BACK TO 12650' AND PUMP 5 'BBLS LO/HI VIS SWEEPS. DRAGGING WEIGHT, -6K ON DWOB THEN FALLS OFF. - RIH FROM 12650'. RUN 2.5 BPM / 10 FT/MIN THROUGH TROUBLE SPOT. STACKING W7AT 12890' - PICK UP -4K DWOB. RUN 2 BPM 115 FT/MIN, STACKING WEIGHT AT 12960' PULLING 65-68K WITH -7 DWOB. ANNULAR PRESSURE SPIKES 450 PSI. WIPER TRIP BACK TO WINDOW TO CLEAN THE HOLE. TURN AROUND JUST BELOW WINDOW AND RIH, CONTINUE TO TRY AND CLEAN OUT THE WELL. RIH 2.7 BPM 115 FT/MIN STACK WT AT 12890'. PICKUP 3K OVERPULL ON DWOB. PULL SHORT WIPER AND RIH 2.7 BPM 111 ' FT/MIN, WASH DOWN 70 12893'. PICKUP IS CLEAN. TRY AGAIN 2.7 BPM / 5 FT/MIN, STACKAT 12890'. PICKUP IS 59K. RIH 2.3 BPM / 10 FT/MIN, STACK Wi AT 12692'. CONTINUE WORKING TO BOTTOM. OVERPULL TO 65K, -5K ON DWOB. BUILD WEIGHTED SWEEP. TRY TO PASS 12894 AT 1 BPM / 25 FT/MIN, STACKING WEIGHT. PICK UP AND TRY 2.7 BPM / 4 FT/MIN, STACKING WEIGHT. DRILL P 12,970.00 PROD1 EASE DOWN FROM 12890' AND REAM BACK TO BOTTOM. AFTER 5 FTAPPEAR TO BE DRILLING NEW HOLE. DISCUSS SETTING BILLET WITH ODE. PULL WIPER TRIP TO WINDOW AT 12670'ANNULAR PRESSURE INCREASES BY 300 PSI, RUN BACK DOWN. START 5 BBL WEIGHTED SWEEP DOWN THE CT. PULL THROUGH AGAIN, NOTHING SEEN, JOG 50' JUST BELOW WINDOW. PULL THROUGH WINDO W AT 0.4 BPM, SLIGHT OVERPULL SEEN -3K ON DWOB. PULLABOVE WINDOW AND DO A 60 FT JOG THEN OPEN EDC. _PARTIAL PACKOFF WHILE DOING JOG. SWEEP BRINGS BACK FINE CUTTINGS ONLY. PERFORM DYNAMIC FLOW CHECK, GOOD. DRILL P 12,970.00 PROD1- POOH FOR BILLET - PERFORM DYNAMIC FLOW CHECK, GOOD - PUMP WEIGHTED SWEEPAND PULL THROUGH 7" AT 20' PER MINUTE - AT 12350' PULL 25K OVER AND LOSE RETURNS, SUPSPECT PACK OFF, ABLE TO FUNCTION HOTAND NO DWOB OBSERVED WHILE TRYING TO WORK PIPE. -25K/-10K Printed 7/25/2019 9*34:OOAM •'All depths reported in Drillers Depths" North America - ALASKA- BP Operation Summary Report Page 9rp5►s. Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074,00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:00AM Rig Release: 7/21/2019 Rig Contractor: NABORSALASKA DRILLING INC. _ _ BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations - - (hr) (us8) 18:15 - 22:00 3.75 DRILL N 12,970.00 PROD1 WORK PIPE - AT 12350' PULL 25K OVER AND LOSE RETURNS, SUPSPECT PACK OFF, ABLE TO FUNCTION HOTAND NO DWOB OBSERVED WHILE TRYING TO WORK PIPE. -25K/ -10K - REDUCE PUMP RATE TO 0.25 AND ATTEMPT TO WORK PIPE WITH NO RETURNS. - CLOSE EDC AND CONTINUE TO ATTEMPT TO WORK PIPE - BRING COIL TO NEUTRAL WrAND SHUT OFF PUMPS FOR 5 MINUTES, ABLE TO MOVE COIL FROM 12350' TO 12460' BRING PUMPS UP TO 2 BPM WITH NO RETURN 11.5 ECDAT DPS, DROP RATE TO 1 BPM AT 11.0 PPG ECD. - MAKE PROGRESS UP TO 12340' OPEN EDC AND BRING PUMP UP TO 2.2 BPM / 4000 PSI 14.5 PPG ECD FOR SHORT DURATION, UNABLE TO ESTABLISH RETURNS, UNABLE TO MOVE PIPE. -LINE UP DOWN BACK SIDE AND PRESSURE UP TO 500 PSI AND DUMP PRESSURE WITH NO SUCCESS TWICE NOTE: MONITORING ANNULUS PUMPING .ACROSS TOP -STABLE FLUID COLLUMN, 'ANYTIME ECDS ARE OVER 11.0 PPG UNABLE TO MOVE PIPE. - DISCUSS OPTIONS MOVING FORWARD WITH ODE, ACTING SUPERINTENDENT AND ACTING ETL-DECIDE TO LET ECDS BLEED DOWN TO 11.0 PPG BEFORE TRYING . _ADDITIONAL OPTIONS. 22:00 - 00:00 2.00 DRILL N 12,970.00 PROD1 WAIT ON ECDS BELOW PACK OFF TO BLEED DOWN TO 11 PPG - WORK PIPE -20K /+20K EVERY HALF HOUR TO MINIMIZE COIL FATIGUE - ECD AT 2200 HRS 13.7 PPG - ECD AT MIDNIGHT 13.5 PPG NOTE: MONITORING ANNULUS PUMPING _ _ _ _ACROSS TOP -STABLE FLUID CO_LLUMN 7/5/2019 00:00 - 08:00 8.00 DRILL N 12,970.00 PROW WAIT ON ECDS BELOW PACK OFF TO BLEED DOWN TO 11 PPG - WORK PIPE -20K /+20K EVERY HALF HOUR TO MINIMIZE COIL FATIGUE - ECD AT MIDNIGHT 13.5 PPG - ECDAT 0230 HRS 12.9 - ECD AT 0500 HRS 12.6 NOTE: MONITORING ANNULUS PUMPING ACROSS TOP PERIODICALLY -STABLE FLUID . COLUMN. 08:00 - 18:00 10.00 DRILL N 12,970.00 PRODi ECD AT 11.98 PPG, WORK PIPE -20K TO 70K, NO MOVEMENT. WAIT FOR ECD TO BLEED OFF. PUMP ACROSS TOP PERIODICALLY, MONITOR ANNULUS FLUID LEVEL. 18:00 - 23:15 5.25 DRILL N 12,970.00 PROD1 ECD AT 11.28 PPG. WAIT FOR ECD TO BLEED OFF. PUMP ACROSS TOP PERIODICALLY, MONITOR ANNULUS FLUID LEVEL. Printed 7/25/2019 9:34:00AM **All depths reported in Drillers Depths— North America -ALASKA - BP Operation Summary Report Gammon Well Name: F-08 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 8/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074 00 ) Project: PBU Site: F Page 10 nig Nam wn-z Spua Law l ime: 711111991 12:00:00AM -ECD AT 10.95 WORK PIPE BETWEEN +20K Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. _ _ _ _ TO ATTEMPT TO FREE PIPE. WORKING PIPE BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) PRESERVE COIL LIFE. 12,970.00 Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _ .. (hr) (usft) _ ORIENT LOWSIDE. 23:15 - 00:00 0.75 DRILL N 12,970.00 PROD? WORKPIPE DISCONNECT. CYCLE PIPE -20K TO 80 2 TIMES WITH OPEN -ECD AT 11.0 START TO WORK PIPE DISCONNECT, NO MOVEMENT. CLOSE DISCONNECT, BETWEEN NEUTRAL WIEGHTAND-25K PUT -22K DOWN WEIGHT AND PRESSURE UP CT X TUBING ANNULUS. LEAVING COIL IN COMPRESSION TO PUT 1000 PSI ON ITAND DUMP, SEE SMALL WEIGHTCHANGE. ATTEMPT TO FREE PIPE. 7/6/2019 00:00 - 09:00 9.00 DRILL N 12,970.00 PRODi WORKPIPE 09.00 - 12:00 3.00 DRILL N 1200 - 00'.00 1200. 7/7/2019 00:00 - 01:30 1.50 DRILL N FISH N Printed 7/25/2019 9*34:OOAM "All depths reported in Drillers Depths'• -ECD AT 10.95 WORK PIPE BETWEEN +20K AND -25K LEAVING COIL IN COMPRESSION TO ATTEMPT TO FREE PIPE. WORKING PIPE EVERY 0.05 REDUCTION IN ECD TO PRESERVE COIL LIFE. 12,970.00 PROD1 DISCUSS PLAN FORWARD WITH ODE AND WOS, ACTING WSUP. PJSM WITH CREWS FOR FREEING PIPE. ORIENT LOWSIDE. PULL2 TIMES TO 75K, 80K. NOMOVEMENT. GOTO+20KWEIGHTAND OPEN DISCONNECT. CYCLE PIPE -20K TO 80 2 TIMES WITH OPEN DISCONNECT, NO MOVEMENT. CLOSE DISCONNECT, PUT -22K DOWN WEIGHT AND PRESSURE UP CT X TUBING ANNULUS. PUT 1000 PSI ON ITAND DUMP, SEE SMALL WEIGHTCHANGE. PUT 1500 PSI THEN 2400 PSI ON BACKSIDE THEN DUMP. REPEAT 35 TIMES. SAWSMALL INCREASE IN ANNULAR PRESSURE ON THE FIRST FEW DUMPS, THEN NOTHING. NO MOVEMENT. PULL TO 75K AND TRY PRESSURING ANNULUS TO 2400 PSI AND DUMPING. REPEAT 4 TIMES. ECD GOES TO 10.33 PPG WHEN PICKING UP. PUMP MIN RATE DOWN THE CT, NO RETURNS ECD GOES TO 11.73 PPG AND STAYS THERE. GO TO 52K WEIGHTAND WAIT FOR ELINE UNIT AND JET CUTTING TOOLS. 12,970.00 PROD? WAIT FOR SLICKLINE AND ELINE UNIT. CONTINUE MONITOR FLUID LEVEL. NOTE: SLICK LINE CREWARRIVED ON LOCATION AT 2115 HRS, CHECKED INVENTORY AND RETURNED TO BASE FOR _ ADDITIONAL EQUIPMENT. _ 12,970.00 PROD? RIG UP TO RECOVER STUCK PIPE -HOLD PRE JOB SAFETY MEETING WITH CREW -COME TO NEUTRAL STRING WEIGHT PLUS 10000-55K -CLOSE UPPER PIPEISLIP RAMS AND CLOSE MANUALLOCKS -PERFORM PUSH PULL TEST TO 5K EACH -PRESSURE TEST TO 500 PSI. -CLOSE LOWER PIPE/SLIP RAMS -MONITOR ANNULUS THROUGH MANAGED PRESSURE DRILLING LINE. Printed 7/25/2019 9*34:OOAM "All depths reported in Drillers Depths'• Common Well Name: F-48 Event Type: RE-ENTER- ONSHORE (RON) Project: PBU -- - Rig Contractor. NABORS ALASKA Active datum: KB @64.83usft (a Date From- To 01:30 - 06:00 North America - ALASKA - BP Operation Summary Report Start Date. 6/30/2019 Site F Spud Datefrime: 7/11. Bova Mean Sea Level) Him Task (hr) 4.50 FISH 06:00 - 0800 2.00 FISH 08:00 - 1230 12:30 - 16:00 16:00 - 17:30 17:30 - 00:00 4.50 FISH Page 11 AFE No End Date. 7/21/2019 X3-019CR-C: (2,778,074.00 ) BPUOI. USA00000765 Code NPT Total Depth Phase Desaiption of Operations (usft) _. DEPTH AT RIG FLOOR. N 12,970.00 PROD? RIG UP TO RECOVER STUCK PIPE -STRIP INJECTOR OFF WELL r -INSTALL SLIPS AND DOG COLLAR ON COIL IN 12,970.00 -ORIENT MOTOR TO 30 DEGREES RIGHT AND OPEN EDC N 12,970.00 -POWER DOWN MWD TOOLS -INSTALL HOT TAP -TAP COIL AND LET MUD DRAIN FROM COIL. -CUT COIL -ATTACH ELINE CLAMPS AND PULL SLACK FROM COIL. N 12,970.00 PROD1 USE ONE LIFTING CLAMPAND 1 BACKUP CLAMP FOR EACH PULL. USING BLOCKS PULLABOUT 50' OF CABLE N 12,970.00 EACH TIME. SEE SEVERAL 1-2K WEIGHT BOBBLES WHILE PICKING UP. PICK _UP 8 TIMES. N 12,970.00 PROD1 CONDUCT PJSM WITH SLB AND NABORS CREW. RIG UP SHEAVES FOR CLEAR CABLE TRAVEL PATH DOWN TO SL UNIT. _HOOK UP FREE CABLE END TO SL DRUM, SPOOL UP OLD ELINE CABLE ONTO SLICKLINE DRUM. PULL LAST 400' OUT BY HAND SO IT DOESN'T FALL THROUGH THE SHEAVE 3.50 FISH N 12,970.00 ' PROD1 BRING OUT SHEAVES FOR SLICKLINE DRIFT RUN. 1.50 FISH 6.50 FISH 7/8/2019 00:00 - 03:00 3.00 FISH Printed 7/252019 9:34:ooAM **All depths reported in Drillers Depths** RIG UP SLICKLINE WITH 1.70" DRIFT. ZERO DEPTH AT RIG FLOOR. RIH, CLEAN PASS. TAG CT CONNECTOR AT 12306'___ r IN 12,970.00 PROD1 POOH WITH SLICKLINE DRIFT. RIG DOWN SLICKLINE UNIT_ AND MOVE OUT. _ N 12,970.00 PROD1 ELINE OPERATIONS -SPOT ELINE UNIT -HOLD PJSM -MOBILIZE ELINE TOOLS TO RIG FLOOR. -RIG DOWN NABORS QTS -RIG UP SLB PUMP IN SUB, QTS AND WIRELINE VALVES -RIG UP LUBRICATOR AND GREASE HEAD AND SHEAVES. N 12,970.00 PROD1 RIG UP E LINE PRESSURE CONTROL EQUIPMENT -HOLD PJSM WITH ONCOMING RIG CREW. -STAB LUBRICATOR AND GREASE HEAD ONTO WIRE LINE VALVES -BREAK QTS TO ENSURE FOSV COULD BE OPENED PRIOR TO CUTTING COIL -MAKE UP QTS, AND FILL PCE FOR TESTING -DISCOVER LEAKAT LUBRICATOR TO GREASE HEAD CONNECTION. -RIG DOWN LUBRICATOR, GREASE HEAD AND WIRELINE VALVES -REPLACE ORING ON GREASE HEAD TO LUBRICATOR CONNECTION. Printed 7/252019 9:34:ooAM **All depths reported in Drillers Depths** Common Welt Name: F-48 Event Type. RE-ENTER- ONSHORE(RON) North America - ALASKA - BP Operation Summary Report Start Date: 6/30/2019 End Date: 7/21/2019 AFE No X3-019CR-C: (2,778,074.00 ) Project: PBU Site: F Rig Name/No. CDR -2 Spud DateMme: 7/11/1991 12:00 OOAM Rig Release: 7/21/2019 Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NP (hr) 03:00 - 13:00 10.00 FISH N 1300 - 1500 2.00 FISH N 15:00 - 17:00 2.00 FISH N 17:00 - 18:45 1.75 1845 - 21:00 2.25 21:00 - 0000 3.00 FISH N FISH N FISH N Page 12 T Total Depth Phase Description of Operations (usft) 12,970.00 PROD? WAIT FOR E -LINE CREW. CONTINUE MONITOR FLUID LEVEL. NOTE: ELINE CREW TIMED OUT, SEND BACK TO QUARTERS FOR REST PERIOD AT 0230 HOURS. WILL BE BACKAT NOON. FUNTION TEST BOPS: ANNULAR, VOR, AND BOTH HCRS. BOTH UPPER AND LOWER PIPE / SLIPS ALREADY FUNCTIONED CLOSED AND LOCKED. CAN'TFUNCTIONBUNDSATTHIS _ TIME, NOTE WAS SENT TO AOGCC. 12,97000 PROD? SLB ELINE CREWARRIVES. PJSM WITH BOTH CREWS FOR TUBING ;PUNCH RUN. _ RIG UP ELINE LUBRICATOR AND PCE. 12,970.00 PROD? USE CHARGE PUMP THROUGH PUMP IN SUB TO FILL SLB RISER. LEAK TIGHT TEST OF ELINE RISER TO 500 PSI, GOOD. CLOSE TIW SO CT DOESNT SEE ANY PRESSURE. BREAKOFF ELINE RISERAT QTS. REMOVE CT CONNECTOR FROM COIL STUB. I TUBING PUNCH BHA ON ELINE. 12,970.00 PROD1 ^RIH WITH ELINE. _ _'TAGAT12268'ELMO 12,970.00 PROD1 FIRE TUBING PUNCH PICKUP TO 12267' AND FIRE PUNCH PUNCH FROM 12263'-12261 NO CHANGE IN TUBING, IAOR OA PRESSURE POOH KEEPING HOLE FULL, AND MONITORING PRESSURES AT SURFACE MONITOR FOR FLOW FOR 10 MINUTES NO FLOW BREAK ELINE PRESSURE CONTROL EQUIPMENTAT QTS SUB RIG DOWN PUNCH TOOL SET PRESSURE CONTROL EQUIPMENT ON ODS OF RIG FLOOR 12,970.00 PROD1 PREPARE TO CIRCULATE ON COIL TUBING HOLD PJSM WITH RIG CREW MAKE UP PUP JOINTS AND CROSSOVER MAKE UP EXTERNAL COIL TUBING CONNECTOR AND PULL TEST TO 40K VERIFY ZERO PRESSURE PICK UP TO STRING WT TO 45 K CLOSEANNULAR OPEN LOWER SET OF PIPEISLIP RAMS VERIFY ZERO PRESSURE BELOW UPPER RAMS OPEN UPPER RAMS ATTEMPT TO CIRCULATE AT 0.25 BPM UNTIL PUMP PRESSURE REACHES 2500 PSI. -NO CIRCULATION NOTE: RELEASE E LINE CREW AT 2300 HOURS WILL BE BACKAT 0700 HOURS NOTE: WHEN OPENING UPPER PIPE RAMS, STRING WT INDICATED 60K WT INDICATOR 72K) Printed 7/252019 9*34:OOAM "All depths reported in Drillers Depths" Printed 7/252019 9*34:OOAM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name: F-48 APE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074 00 ) Project: PBU Site: F Page 13 Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00 OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB@64.83usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) _PR 7/9/2019 00:00 - 03:00 3.00 FISH N 12,970.00 PRODt ATTEMPT TO CIRCULATE BRINGING PUMP RATE TO 0.25 BPM WITH A MAX PRESSURE OF 2500 PSI, OBSERVED A PRESSURE DROP AND RETURNS AFTER SITTING 15 MINUTES WITH PUMPS OFF AND HOLDING PRESSURE. BRING PUMPS UP GRADUALLY TO 3.3 BPM IN 3.3 BPM OUT AT 2190 PSI WITH DOWNSTREAM CHOKE PRESSURE AT 130 PSI. CIRCULATE SURFACE TO SURFACE TAKING RETURNS TO TIGER TANK BRING RETURNS INSIDEAND CONTINE TO CIRCULATE UNTIL BOTTOMS UP -RETURNS CLEAN UPON BRINGING TO PITS. FLOW CHECK FOR 10 MINUTES -STATIC 03:00 - 06:00 3.00 FISH N 12,970.00 PROD1 WORK PIPE ATTEMPT TO FREE COIL LEFT IN HOLE REDUCE CLOSING PRESSURE ON ANNULAR TO 300 PSI PICK UP TO 75K STRING WEIGHT X 3 WITH NO MOVEMENT. BRING PUMPS UP TO 3.5 BPM AT 2000 PSI, WT INDICATOR AT 72K REDUCE CLOSING PRESSURE ON ANNULAR TO 300 PSI PICK UP TO 75K STRING WEIGHT X 3 WITH NO MOVEMENT BRING DOWN STRING WEIGHT TO 54K BRING PUMPS UP TO 2.3 BPM AT 1488 WORK PIPE BETWEEN 54KAND 75K. NO MOVEMENT 0600 - 0800 2.00 FISH N 12,970.00 PROD1 CLOSE UPPER 2-3/8" PIPE / SLIP RAMS. TEST -/- 5K WEIGHT, GOOD. CLOSE LOWER 2-3/8" PIPE / SLIP RAMS. SLACK OFF BLOCKS ALL THE WAY. PT IN BETWEEN RAMS TO 500 PSI, GOOD. INSTALL TIW VALVE. 08:00 - 09:40 1.67 FISH N 12,970.00 PROD? WHILE WAITING FOR ELINE, LEAVE TIW OPEN TO MONITOR WELL. AFTER 30 MIN SMALL TRICKLE OF MUD IS SEEN COMING OVER THE TIW SHUT IT AND INSTALL GAUGE, MONITOR AND RECORD RECORD PRESSURESAT THE CT AND THE MANAGED PRESSURE GAUGE BELOW THE LOWER PIPE / SLIP RAMS. NOTIFY WSUP. 09:40 - 12:20 2.67 FISH N 12,970.00 PROD? DISCUSS WITH WSUP AND WOM. BLEED OFF 1/2 STYROFOAM CUP IN 10 MIN. PJSM WITH ELINE CREW. M/U ELINE BHA. TROUBLESHOOT COMB ISSUE_ WITH_TOOL. 12:20 - 13:20 1.00 FISH N 12,970.00 PROD1 REBUILD CABLE HEAD. 1320 - 1640 3.33 FISH N 12,970.00 PROD1 M/U ELINE BHA FOR JET CUT CT. CUT OFF CT CONNECTOR, RUN CUTTER TOOL DOWN INSIDE CT. M/U ELINE BOPS TO WELL. RIH, LEAK TIGHT TEST RISER CONNECTION TO 500 PSI, GOOD. TIE-IN DEPTH. Printed 7/2512019 9:34:OOAM **All depths reported in Drillers Depths" Printed 725/2019 9:34:OOAM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 14 &RM Operation Summary Report Common Well Name: F-48 AFE No Event Type'. RE-ENTER- ONSHORE (RON) Start Date. 6/30/2019 End Date: 7/21/2019 X3-019CR-C: (2,778,074.00 ) Project: PBU Site: F Rig Name/No.'. CDR -2 Spud Date/rime: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @84.83uaft (above Mean Sea Level) Date From - To Hm Task Code NPT Total Depth Phase Description of Operations —_. -. _ (hr) (usft) 16:40 - 17:00 0.33 FISH N 12,970.00 PROD1 REVIEW DEPTH TIE-IN AND CORRELATION WITH SLB ENGINEER. GET ON DEPTH AND CUT CTAT 12233', MANAGED PRESSURE INCREASES FROM 96 I TO 111 PSI WHEN CUT. CT PRESSURE UNCHANGEDABOUT 50 PSI. 17:00 - 19:00 2.00 FISH N 12,970.00 PROD? POOH WITH JETCUT BHA ON ELINE PERFORM 10 MINUTE FLOW CHECK AT SURFACE GOOD. RIG DOWN CUTTING BHA BREAK DOWN SLB PRESSURE CONTROL EQUIPMENTAND MOVE TO OFF DRILLERS SIDE. 19:00 - 21:00 2.00 FISH N 12,970.00 PROD1 PREPARE TO PICK UP COIL TUBING HOLD PJSM WITH RIG CREW MAKE UP PUP JOINTSAND CROSSOVER MAKE UP EXTERNAL COILTUBING CONNECTORAND PULL TEST TO 40K. VERIFY ZERO PRESSURE PICK UP TO STRING WT TO 45 K CLOSEANNULAR OPEN LOWER SET OF PIPE/SLIP RAMS VERIFY ZERO PRESSURE BELOW UPPER RAMS OPEN UPPER RAMS PICK UP TO 62K STRING WEIGHTAND PICK COIL UP S' SET IN SLIPS AND DOG COLLAR. MONITORING WELL PUMPING ACROSS TOP. 21:00 - 00:00 3.00 FISH N 12,970.00 PROD1 DEMOB SLB EQUIPMENT FROM RIG FLOOR. PUT CHAINS BACK ON TUGGERS MONITORING WELL PUMPING ACROSS TOP, 7/10/2019 00:00 - 03:00 3.00 FISH N 12,970.00 PROD? RIGUPTOPULLCOIL HOLD PJSM WITH CREW CLOSE UPPER SET OF PIPE SLIP RAMS RUN IN MANUAL LOCKS, CLOSE LOWER SET OF PIPE SLIP RAMS AND PULL TEST TO 5K REMOVE EXTERNAL COIL CONNECTOR AND LIFT SUB INSTALL SPOOLABLE CONNECTOR UNABLE TO RELEASE HAND SLIPS MONITORING WELL WITH MPD LINE Printed 725/2019 9:34:OOAM "All depths reported in Drillers Depths" Common Well Name F-48 Event Type: RE-ENTER- ONSHORE(RON) PBU North America - ALASKA - BP Operation Summary Report Start Date: 8/30/2019 Site: F AFE No End Date: 7/21/2019 X3-019CR-C: (2,778.074.00) Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) _ 03:00 - 06:00 3.00 FISH N 12,970.00 PROW CUT OFF SPOOLABLE CONNECTOR 06:00 - 08:30 2.50 FISH N 12,970.00 .08:30 - 0930 1.00 FISH N 12,970.00 Page 15 REINSTALL SPOOLABLE CONNECTOR ON COILAT INJECTOR INSTALL EXTERNALCOIL CONNECTORAND TEST TO 45K PICK UP TO STRING WT TO 45K 'CLOSEANNULAR OPEN LOWER SET OF PIPEISLIP RAMS VERIFY ZERO PRESSURE BELOW UPPER RAMS OPEN UPPER RAMS PICK UP STRING Wt 50K AND REMOVE SLIPS CLOSE UPPER SET OF PIPE SLIP RAMS RUN IN MANUAL LOCKS, CLOSE LOWER SET OF PIPE SLIP RAMS AND PULL TEST TO 5K REMOVE EXTERNAL COIL CONNECTOR AND LIFT SUB DRESS CT STUB IN BOPS FOR INTERNAL DIMPLE CONNECTOR. MOVE CART OVER AND WU DOUBLE ENDED CT SPOOLABLE CONNECTOR. PROD? PJSM FOR SPOOLING UP CUT CT. FOLLOW NABORS PROCEDURE TO STRIP DOWN OVER CTAND WU RISER. PULL TEST CT CONNECTOR TO 60K. PRESSURE TEST TO 500 PSI FROM THE OUTSIDE THROUGH THE PUMP IN SUB. STRIP UP AND INSPECT CT CONNECTOR, GOOD. STRIP BACK DOWN AND ENGAGE TRACTION PRESSURE, GET 55K ON CT WITH INJECTOR. PT QTS, GOOD. OPEN LOWER AND UPPER PIPE / SLIP RAMS. SPOOL UP CT CAREFULLY THROUGH THE STRIPPER, OVER THE GOOSENECKAND ONTO THE REEL. CIRCULATE ACROSS KILL LINE WHILE POOH. ESTABLISH EXCLUSION ZONE ON PIPE SHED, RIG FLOOR. PROD? WITH 6 WRAPS ON THE REEL, STOP AND INSPECT STRIPPER. CLOSE UPPER AND LOWER PIPE SLIP RAMS. PT IN BETWEEN RAMS TO 500 PSI, GOOD. OPEN STRIPPER AND INSPECT CT RACKOFF. RACKOFF IS GOOD, PUT IT BACK IN. PT PACKOFFS TO 500 PSI. FAIL 2 TIMES. REPLACE PACKOFF ELEMENT. PT IS GOOD, Printed 7/25/2019 9:34:OOAM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 166P" Common Well Name: F-48 AFE No Event Type. RE-ENTER- ONSHORE(RON) Start Date: 6/30/2019 Eno Date. 7/21/2019 X3-019CR-6:(2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Dale/Time: 7/17/1991 12.00:OOAM Rig Release: 7/21/2019 Rig Contractor NABORS ALASKA DRILLING INC. _ BPUOI: USA00000765 _ _ _ Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _. (Usft) 0930 - 1300 3.50 FISH N 12,970.00 PROD1 CIRCULATE DOWN CT FOR POOH. CIRCULATE 0.79 / 0.58 BPM AT 1270 PSI. AROUND 1000 FT START GETTING LIGHT RETURNS BACK, STOP CTAND PUMP, OUT RATE GOES TO 0. SEND RETURNS OUT TO TIGER TANK FOR BOTTOMS UP, OUT DENSITY GOES BACK UP TO 8.5 PPG. GETTING 1:1 IN / OUT WHILE PUMPING OUT TO TIGER TANK, OUT DENSITY SOLID 8.56 PPG. PURGE CT RISER OUT TO TIGER TANK THEN FLOW CHECK FOR 15 MIN. SHOWING DIMINISHING TREND PAST 1.5 MIN TO FILL 16 OZ CONTAINER. DISCUSS WITH WSUP, CONTINUE POOH TO 13:00 - 14:45 1.75 FISH N 12,970.00 PROD1 AT 500' OPEN CT RISER, WATCH FOR END OF PIPE. PULL END OF CT UP THROUGH RISER AND -ATTACH CLAMP. CUT OFF END OF CT FOR INSPECTION. PREP TO PUMP FRESH WATER THROUGH REEL THEN PURGE. FUNCTION BLINDS. - HES N2 ON LOCATION, PJSM TO RU, TEST LINE AND COOL DOWN - PT PACKOFFS TO 250 LOW AND 3500 PSI HIGH GOOD 1445 - 0000 9.25 FISH N 12,970.00 PROW _P_T_ REEL BLOW DOWN & UNSTAB OPS - HOLD A PJSM WITH NABORS & HES CREW TO REVIEW PROCEDURES AND DISCUSS EXCLUSION ZONES - PT N2 LINE TO 250 LOS W AND 4700 HIGH - GOOD TEST, VERIFY VALVE LINE UP - LINE UP N2 TO REEL, CONFIRMED RETURNS, INCREASE RATE TO 1800 SQFT/MIN FOR 11 MIN THEN SHUT DOWN - BLEED OFF RESIDUAL PRESSURE TO ZERO PSI - OPEN LUBRICATOR TO TO VERIFY NO PRESSURE - NO PRESSURE, PU INJECTOR AND PREP COIL FOR GRAPPLE AND INSTALL - PJSM TO REVIEW PROCEDURE TO UNSTAB COIL - INSTALL GRAPPLE AND PULL TEST TO 2700 FT/LBS GOOD - UNSTAB COIL AND PULL TO REEL - SECURE REELAND REMOVE REEL IRON - OFF LOAD REEL ONTO TRUCKAND SECURE ON TRUCK - LOAD NEW REELAND INSTALL SHIMS - CHANGE OUT BRASS Printed 7/25/2019 9:34:OOAM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name: F-48 Event Type. RE-ENTER- ONSHORE (RON) Start Date. 6/30/2019 End Date: 7/21/2019 AFE No X3-019CR-Q (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud DateMme: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ — (hr) .__ (usft) 7/11/2019 00:00 - 12:30 12.50 FISH N 12,970.00 PROD1 INSTALL REEL 12:30 - 16:30 4.00 FISH 16:30 - 20:15 3.75 FISH 20:15 - 21:45 1.50 FISH 21:45 - 00:00 2.25 7/12/2019 00:00 - 01:30 1.50 FISH FISH Page Printed 7125/2019 9:34:OOAM **All depths reported in Drillers Depths" - SHIM HUBS - INSTALL SADDLE CLAMPS -REPLACE BRASS IN INJECTOR PACKOFF - REMOVE PACKING MATERIALS FROM REEL - INSTALL DRIP PANSAND WEATHER STRIPPING -CLEAN UP REELAREA - CUT STRUT IN REEL TO ALLOW FOR INNER REEL IRON - INSTALLING INNER REEL IRON AND PRESSURE BULKHEAD —FOUND ELINE INSIDE OF 3" NIPPLE BIRD NESTED FROM INJECTION. PULLED ELINE OUTAND HAD TO SPLICE THE WIRE FROM .OUTSIDE OF THE BULKHEAD TO THE J -BOX.*** -INSTALL GRAPPLE, PULL COILACROSS AND STAB, CUT OFF GRAPPLE AND MU THE CTC - "'MEG TEST ELINE TO CONFIRM ELINE INTEGRITY- - MEG TEST IS GOOD, MU CTC N 12,970.00 PROD? REELMANAGEMENT - STAB ON AND DISPLACE COIL TO FRESH WATER - PUMP SLACK OUT CYCLING PUMPS - PUMPED OUT 365' OF 389' - PULL PH6 OUT, BOOT WIRE, CHANGE PACKOFFS (PACKOFFS DAMAGED WHILE STABBING COIL) - MU NOZZLE, STAB ON, PT THE PACKOFFS AND UPPER OTS - GOOD TEST, PU THE INJECTOR AND MU BOT CTC AND PT TO 4700 PSI N 12,970.00 PROD? MAKE UP BHAAND RIH - GOOD TEST, MU THE MILLING BHA -RIH WITH MILLING BHA - CHECK SADDLE CLAMPS AT 2500',7500- AND 11800' - TAG AT 12210' WITH 5K N 12,970.00 PROD? DRESS OF TOP OF FISH - GET PARAMETERS PUMP 2.5 BPM IN/2.5 BPM OUT 2090 PSI, UP WT 48K / DOWN WT 21K - MILL OVER TOP OF FISH WITH DRESS OFF MILL AT 2-3.5K, PUMP 2.5 BPM AT 1900 - OBSERVE PRESSURE INCREASE AND ADDITIONAL WT ON BIT AT 12228' -SUSPECT TOP OF FISH. MILL TO 12229' -PICK UP TO 12970' TURN PUMPS OFF AND DRY DRIFT 12229.4 WITH 5K DOWN - FLOW CHECK STATIC - PICK UP OFF FISH AND INCREASE PUMP RATE TO 3 BPM FOR 15 BBLS AND THEN POH AT 3 BPM. N 12,970.00 PROD1 POOH 3.0 BPM IN / 2,5 -BPM _ OUT 2040 PSI _ N 12,970.00 PROD1 POOH - 3.0 BPM IN / 2.5 BPM OUT 2040 PSI - FLOW CHECK WELL FOR 10 MINUTES -STATIC Printed 7125/2019 9:34:OOAM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 18 64"W Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/302019 End Date: 7/21/2019 X3-019CR-C: (2,778,074 00 ) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12o0:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @84.83ush (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations - (hr)_ ._ lush) 01:30 - 03:30 2.00 FISH N 12,970.00 PROD? BHA OPERATIONS -HOLD PJSM WITH CREW FOR BHA HANDLING -LAV DOWN DRESS OFF BHA -MAKE UP FISHING BHA NOTE: GOOD INDICATION OF BEING OVER _FISH WITH BURN SHOE. 03:30 - 07:00 3.50 FISH N 12,970.00 PROD? FISHING OPERATIONS - RIH 0.29 BPM IN / 0.72 BPM OUT 661 PSI NOTE: HELD KICK WHILE TRIPPING DRILL WITH MICAH BUSH'S CREW WITH AAR TIME 'TO SECURE WELL 85 SECONDS (SIMULATED) - STOPAT 12176AND GET WT'S, PU WT=51K RIH WT = 25K - RIH AND TAG HIGH AT 12186', PU AND RIH TAG SAME DEPTH, BASED ON THE TALLIES WE ARE TAGGING BETWEEN THE PKR AT 12170 AND THE NIPPLE AT 12223 - PU 100' AND RUN BACK DOWN, PU IS CLEAN RIH. MADE IT DOWN TO 12193, LOOKS LIKE WE HAVE SOME JUNK BESIDE US AND WE ARE PUSHING IT DOWN, CALL WSUPT 8 WOS TO DISCUSS OPS '- DECISION MADE TO POOH FOR A VENTURI JUNK BASKET TO CLEAN OUT DEBRIS TO TOP OF FISH 07:00 - 12:00 5.00 FISH N 12,970.00 PROD1 POOH FOR VENTURI JUNK BASKET BHA - FLOW CHECK WELL - GOOD NO FLOW, POOH HOLDING 100 PSI WHIP PUMPING ACROSS THE TOP, WE CANNOT PUMP DOWN THE COIL WITH THE GS SPEAR AS IT COULD RELEASE THE BAIT SUB - BLEED OFF WHIP AND FLOW CHECK WELL - GOOD NO FLOW, PU INJECTOR AND STBK THE COLLARS - AFTER INSPECTING THE MULE SHOE ON THE BAIT SUB WE NOTICED THAT THERE ARE GOUGES ON THE INSIDE OF THE SHOE WITH A LARGE RADIUS INDICATING WE MIGHT HAVE BEEN TAGGING UP AT THE 4-12" TUBING STUMPAT 12161'. CALL WSUPT 8 WOS TO DISCUSS - PUMP 7/e" DRIFT BALL FOR DISCONNECT -BALL RECOVERED Printed 725/2019 9:34:OOAM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 19 Common Well Name: F-48 AFE No Event Type. RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date 712 112 01 9 X3-019CR-C: (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud DateMme: 7/11/1991 12:00:00AM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. _ BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description or Operations 12:00 - 17:00 5.00 FISH N 12,970.00 FROM FISHING OPS - BASED ON THE MARKS INSIDE THE MULE SHOE WE ARE GOING TO REVERT BACK TO OCN #9 AND MU THE FISHING BHA WITH AN INDEXING SUB TO ORIENT THROUGH THE TUBING STUMP IF WE TAG WHEN GOING BACK IN - HOLD A PJSM TO MU THE FISHING BHA - MU BHA WITH INDEXING SUB - RIH - CREW CHANGE - DISCUSS WITH BEARDS 'CREW FISHING OPS AND POTENTIAL FOR TRAPPED PRESSURE UNDER THE RESTRICTION AND MONITOR RETURNS -STOP AT 12150 AND GET WPS, PU Wr= 54K RIH AT = 24K - RAN PAST 12193 CLEAN LAST DEPTH WE 'TAGGED AT - 12235' START TAKING WT, SET DOWN 15K AT 12241.64' ' - PU TO 1 OK OVER UP WT T AND VERIFY WE ARE LATCHED ON TO THE FISH - PULLED TO 64K WE ARE LATCHED ON, RIH TO 10K SURFACE Wi, SAME DEPTH SHOULD BE FULLY ENGAGED ON THE FISH - START WORKING JAR HITS GOING DOWN COIL LIFEAT 2.5% - 14 JAR HITS, HOLD DOWN Wr AND CIRC TO VERIFY WELL IS FULLAND COOL DOWN JARS 0.5 BPM AT 1032 PSI - 20 JAR HITS GOING DOWN NOT SEEING MUCH CHANGE IN DEPTH - AS PER OCN, LINE UP DOWN THE BACKSIDE AND PRESSURE UP 702000 PSI 17:00 - 18:30 1.50 FISH N 12,970.00 PROD? PRESSURED UP 70 2000 PSI AND GOT 15K BACK IN STRING WT, RIH AND WE CAN MOVE DOWN TAG AT 12282', PU AND WE ARE MOVING FREE BLEED OFF WHP AND COME ONLINE WITH PUMP AT 0.3 BPM WE ARE SEEING HIGHER CIRC PRESSURE AND COULD BE CIRCULATING DEBRIS UP AROUND US CALL WSUPTAND DISCUSS NOT PUMPING AND POOH TO SEE IF WE CAN WSUPTAGREES, POOH PULLING HEAVYAT 12231' 11' ABOVE WHERE WE STARTED JARRING RIH FREE, PU AND WEARE PULLING 10K OVER AT SAME DEPTH 4X RIH TO WHERE WE TAGGED AT 12282' AND RAN PAST CLEAN TO 12350' STOP AND CALL WSUPT 8 ETL AND DISCUSS DECISION MADE TO WORK FISH OOH WITHOUT PUMPING, IF WE ARE NOT MAKING PROGRESS CALL WSUPT AND DISCUSS SLIGHT BOBBLE AT 12131 BUT PULLED THROUGH CLEAN CONTINUE POOH SLOW UNTIL THE BHA IS IN THE TUBING Printed 7/25/2019 9:34:00AM **All depths reported in Drillers Depths" Printed 7/25/2019 9:34'.00AM '•AIL depths reported in Drillers Depths" North America - ALASKA - BP Page 20 OSA Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 6/30/2019 End Date: 7/21/2019 X3-019CR-C (2,778,074.00 ) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time: 7/11/1991 12:00:OOAM Rig Release. 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. _ BPUOI: USA00000765 Active datum: KB @64.83usR (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ _.. _ (usft) 18:30 - 23:00 4.50 FISH N 12,970.00 PROD? _ __ _ POOH -POOH TO 12070' OBSERVE OVER PULLS 2-3K -MONITOR WELL PUMPING ACROSS TOP OF WELLAT 0 5 BPM HOLDING 100 PSI WELL HEAD PRESSURE. -STOP AT 200' AND MONITOR WELL PRIOR TO HAVING BHAACROSS BOPS FOR 15 MINUTES -STATIC 23:00 - 00:00 1.00 FISH N 12,970.00 PROD1 LAY DOWN BHA -HOLD PJSM WITH CREW FOR LAYING DOWN BHAAND FISH -LAY DOWN FISHING BHA__ _ 7/13/2019 00:00 - 01:30 1.50 FISH N 12,970.00 PRODi LAY DOWN BHA -LAY DOWN FISHING BHA -LAY DOWN RECOVERED BHA#5 NOTE: FOUND 1/2"-3/4" PEICES OF SHALE ON TOP OF CTC ON RECOVERED BHA NOTE: NO DAMAGE FOUND ON EXTERIOR OF FISH (BHA #5) NOTE: BIT ON BHA 5 GRADED 1-1 -NOTE: 01:30 - 02:30 1.00 FISH N 12,970.00 TI PROD1 INJECTOR PERFORM POST JARRING INSPECTION 02:30 - 03:15 0.75 FISH IN 12,970.00 PRODt . MAKE UP BHA# 9 --HOLD PJSM WITH CREW -MAKE UP NOZZLE BHA -MAKE UP INJECTOR AND TEST QTS TO 3500 PSI 03:15 - 06:30 3.25 FISH N 12,970.00 PROD1 RIF TREAT LOW VIS MUD WITH GEOVIS XT AND BDF976 WHILE RUNNING IN HOLE ON THE FLY 3.5 BPM IN / 4.0 BPM OUT AT 2300 PSI Printed 7/25/2019 9:34'.00AM '•AIL depths reported in Drillers Depths" Common Well Name: F-48 Event Type: RE-ENTER- ONSHORE(RON) Project: PBU Rig Name/No.: CDR -2 Rig Contractor: NABORS ALASKA DRILLINi Active datum. KB @64.83usR (above Mean Sea Level) North America - ALASKA- BP Operation Summary Report Stan Date: 6/30/2019 End Date: 7/21/2019 Site: F AFE No X3-019CR-C: (2,778,074.00 ) Rig Release: 7/21/2019 Page 21 j Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ (usfi) 06:30 - 16:30 10.00 FISH N 12,480.00 PROD1 CLEAN OUT OPERATIONS - STOP RIH TO LOAD LOW VIS ON RIG, BUILD HIGH VIS PILLS AND REVIEW THE WELLS GROUP FILL CLEAN OUT RP - HOLD A PJSM WITH THE CREW - PUMP A 10 BBL HI VIS PILL FOR THE TUBING BEFORE WE GET STARTED AS WE ARE SEEING SOME SHALE FROM RIH - BOTTOMS UP FROM HVP IS CLEAN -RIHDRYTOTAGRIHWT=21K PUWT= 51KNO PUMP(WITH PUMPS PU WT=46K) - DRIFTED TO 12250 BUT STARTED SEEING WT BOBBLESAT 12170', PU AND START CLEAN OUT FORM 12150' - START FILL CLEAN OUT FOLOWING THE WELLS GROUP RP, NO MORE THAN 1 BBL BITES BASED ON TUBING OR LINER ID CHASING EACH BITE TO THE TT WITH 5X10 LOW & HIGH VIS PILLS - HAVEN'T SEEN MUCH AS FAR AS LARGE CUTTINGS MOSTLY FINES FROM THE LAST PILLS FROM 12300'. CONTINUALLY WATCH STRING WEIGHTS UP AND DOWN TO SEE IF WE ARE LOADING UP THE LONG TANGENT SECTION TO 2100 - HARD TAG AT 12480' (UNCORRECTED) -25' CORRECTION WOULD PUT US AT 12,455'. PUMP SUPER HIGH VIS PILLAND TRY RAMMING THE BRIDGE TO SEE IF WE CAN BREAKTHROUGH - PILLS OUT CAN'T BREAK THROUGH BRIDGE, POOH PUMPING & CHASING PILLS FOR SMART BHA WITH MOTOR & MILL - PUMP LOW & HIGH VIS PILLS IN TANGENT SECTION - NO SIGNIFICANT AMOUNT OF CUTTINGS FROM PILLS - FLOW CHECK AT SURFACE GOOD NO FLOW LD BHA 16:30 - 23:30 7.00 FISH N 12,480.00 PRODt REELOPS - PUMP SLACK INTO REEL, RU CUTTER AND CUT 316' OF COIL FOR 2% SLACK -PUMP SLACK FORWARD, MU CTC, PULL TEST TO 50K, PRESSURE TEST TO 250/3500 PSI FOR 5 MIN EACH - PUMP SLACK FORWARD - DID NOT FIND ELINE AFTER PUMPING SLACK FORWARD, ATTEMPTAGAIN WITH NO LUCK PUMPING AT 4.6 BPM. - RIH WITH COIL 100' AND SURGE/PUMP AT 4.6 BPM - HEAD UP BHI - PRESSURE TEST BHI CONNECTOR 3500 PSI - PRESSURE TEST CHECKS TO 250/3500 PSI FOR_5 MINUTES EACH. 23:30 - 00:00 0.50 FISH N 12,480.00 PROD? MAKE UP CLEAN OUT BHA# 10 7/14/2019 00:00 - 00:30 0.50 FISH N 12,480.00 PROD? MAKE UP MILL/ CLEAN OUT BHA # 10 Printed 7/252019 9:34:OOAM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 22 Common Well Name. FAB AFE No Event Type'. RE-ENTER- ONSHORE (RON) Start Date 6/30/2019 End Date 7/2112019 X3-019CR-C: (2,778,074.00 ) Project: PBU Site: F Rig Name/No.: CDR -2 Spud Date/Time. 7/11/1991 12,00:DOAM Rig Release: 7/21/2019 Rig Contractor. NABORSALASKA DRILLING INC. BPUOI: USA00000765 _ Active datum: KB @64.83usR (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ WO 00:30 - 05:30 5.00 FISH N 12,480.00 PROW _ _ RIH - 1.06 BPM IN / 1.55 BPM OUTAT 1160 PSI -SET DOWN 10KAT 12180' UNCORRECTED, 12160" CORRECTED-SUSPECT4.5" TUBING STUB - PICK UP 20' WITH NO OVER PULL - RBIH AND SET DOWN AT SAME SPOT WITH 7K - DISCUSS WITH ODE, AGREE TO FINDA HIGHER TIE IN POINTAND THEN PUMP AT 0.5 BPM WITH ECD CLOSED AND ATTEMPT TO PASSTHROUGH. -CLOSE EDC - TIE IN FROM 11984' TO 12104' CORRECTION -8• - RIH AT 0.5 BPM IN 10.63 BPM OUT AT 1362 PSI -PASS THROUGH 12172' WITH NO ISSUES. - TIE IN TO BETTER MARKER FROM 12390' TO 12460' -12' (PUTTING SET DOWN AT 12180 UNCORRECTED AT 12160') '- RIH AND TAG AT 12480' - PULL UP TO 12000' PERFORM CCL LOG - START TO SEE LIGHT READINGS ON OUT MICROMOTION STOP PUMPING AND FLOW CHECK NO FLOW, RESTART PUMPS AND READINGS CONTINUE ERRATIC ON OUT MICROMOTION. FLOW CHECKAGAIN NO FLOW, SHUT IN CHOKE WHILE MAKING CALL TO SUPERINTENDENT AGREE TO CIRCULATE TO TIGER TANK TO SEE IF MICROMOTIONS STABILIZE,, MICROMOTIONS STABILIZED FOR 5 MINUTES, BROUGHT RETURNS BACK INSIDE AND STARTED TO SEE MICROMOTION FLUCTUATIONS ON RATE AND DENSITY, SHUT IN AND CALL WELL SUPERINTENDENT, AGREE TO PURGE LUBRICATOR WITH MUD TO TIGER TANKAND CIRCULATE BOTTOMS UP OUT TIGER TANK MONITORING OUT RATE DENSITY. 05:30 - 08:00 2.50 FISH N 12,480.00 PROD? _AND CIRCULATE BOTTOMS UP WELL KILL - LUBRICATOR PURGED TO TT - CIRCULATE BOTTOMS UP PICKING UP SLOWAND HOLD 100 PSI WHP -RATES IN/OUT=2.23/2.20 DENSITYIN/ OUT =8.55/8.45 - OUT MM RATE 8 DENSITY HAVE BEEN STABLE -BOTTOMS UP IS CLEAN, PURGE LUBRICATOR -SHUT DOWN PUMPAND FLOW CHECK WELL -GOOD NO FLOW, CALL WSUPT, ODEAND WOS - GOOD TO PROCEDE WITH CLEAN OUT DOWN TO 12,498' Printed 7/252019 9:34:OOAM ••A0 depths reported in Drillers Depths" Printed 7/25/2019 9:34:o0AM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 23 @04 Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 6/30,2019 End Date'. 7/21/2019 X3-019CR-C'. (2,778,074.00 ) Project: PBU - Site F - Rig Name/No.. CDR-2 Sputl Da[e/Time: 7/11/1991 12,00 OOAM Rig Release: 7/21/2019 Rig Contractor: NABORSALASKA DRILLING INC. _ _ BPUOI: USA00000765 _ _ Active datum: KB @64.83usft (above Mean Sea Level) - - Date From - To Hm Task Code NPT Total Depth Phase Description of Operations (hr) - (usft) 08:00 - 13:30 5,50 FISH N 12,498.00 -PROD1 FILL CLEANOUT - RIH TO 12480, SEE INCREASE IN MOTOR WORK, START LOW 8 HIGH VIS PILLS DOWN COIL - CLEAN OUT TO 12498' TO ENSURE WE HAVE RAT HOLE FOR THE NEXT WS RUN - PUH SLOW WAITING FOR PILLS - CHASE PILLS 7O 12150 AT 80%1001IN TO THE 4-1/2" TUBING - PACKING OFFAT THE TT, REDUCE RATE AND RIH SLOW, BRING RATE UP AND PU SLOW TO THE TT - START 1 OX10 LOW 8 HIGH VIS PILLS AND RIH TO 12498' - POOH CHASING PILLS TO 12150 - RIH 7O 12495, CIRCULATE A BOTTOMS UP - SHUT DOWN PUMP, OPEN EDC AND FLOW CHECK WELL - POOH PUMPING AT MAX RATE PUMPING PILLS IN THE 4-1/2 TANGENT SECTION - JOG IN HOLE 500', PUH TO 150' AND FLOW CHECK WELL GOOD NO FLOW, PU THE INJECTOR AND POOH INSPECTING THE COIL FOR FLAT SPOTS LD BHA, BHA OOH 13:30 - 17:30 4.00 BOPSUR P 12,498.00 PRODt PREP FOR TESTING BOPE - REMOVE DFCVAND CHANGE PACKOFFS - SWAP OUT LUBRICATORS FOR TESTING - STAB INJECTOR AND DISPLACE COIL 8 MPD LINE TO WATER - LTT MASTER VALVE #1 AND SWAB - GOOD LTT - LTT MASTER VALVE #2 AND SWAB - GOOD LTT -SHELL TEST- GOOD TEST, STAB INJECTOR TO START TESTING BOPE Printed 7/25/2019 9:34:o0AM "All depths reported in Drillers Depths" Printed 7/25/2019 9:34:OOAM "All depths reported in Drillers Depths" North America -ALASKA - BP Page 24 oD25. Operation Summary Report Common Well Name: F-48 AFE No Event Type: RE -ENTER -ONSHORE (RON) Start Date. 6130/2019 End Date: 7/21/2019 X3-019CR-C'. (2,778,074.00) Project: PBU Site: F Rig Name/No.: CDR -2 Sputl Date/Time: 7/11/1991 12:00:OOAM Rig Release: 7/2112019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @84.83usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _— (hr) (usft) 17:30 - 00:00 6.50 _ BOPSUR P 12,498.00 _ PR0D1 _ TEST BOPE TO BOTH BP/AOGCC REQUIREMENTS WITNESS WAIVED BY AOGCC JEFF JONES 74/16" ANNULAR, BLIND/SHEAR, 2-3/8" PIPE -SLIP, 2-3/8" x 3.5" VARIABLE PIPE RAM, 2-3/8" PIPE -SLIP ALL TESTS WILL BE 250 PSI LOW/ 3500 PSI HIGH HELD FOR 5 MIN EACH -TEST 1: IRV, RACKOFF, C9, C10 BACKWARDS - PASS -TEST 2: BLIND/SHEAR, R1,BL1A,BI, 84 - PASS - TEST 3: ANNULAR (2-3/8") TIW#1, B3, B2, BL1 -PASS -TEST 4: UPPER 2-3/8" PIPE -SLIP, TIW#2, BL2, R2, T2, C15 - PASS - TEST 5: C16, T1, C71 - PASS '- TEST 6: VARIABLES (2-3/8"), C7, C9, C10, TV2 - FAILURE TV 2 -GREASE AND RETEST AFTER MIDNIGHT PASS TEST 7: LOWER 2-3/8" PIPE -SLIP, C5, Cl C8, TV1-PASS -TEST B: CH0KE A, CHOKE C - PASS -ACCUMULATOR DRAWDOWN TEST -PASS '- TEST 9: ANNULAR (3-1/2"), Ci, C4 -PASS - TEST 10: VARIABLES (31/2"), C2, C3 - PASS 7/15/2019 00:00 - 00:30 0.50 BOPSUR P 12,498.00 PR0D1 TEST BOPE TO BOTH BP / AOGCC REQUIREMENTS WITNESS WAIVED BY - AOGCC JEFF JONES GREASE AND RETEST TV2 WITH MASTER VALVE, T1, B7, B4, AND NIGHTCAP TO 250/3500 PSI FOR 5 MINUTES EACH -PASS 00:30 - 04:00 3.50 BOPSUR P 12,498.00 PRODi RIG DOWN FROM BOP TEST - RIG DOWN TEST EQUIPMENT - SWAP TEST LUBRICATOR FOR DRILLING LUBRICATOR. -INSTALL CHECKS - TEST DRILLING RISER AND CHECKS TO 250/3500 PSI FOR 5 MINUTES EACH - DISPLACE WATER IN SURFACE LINES AND _COIL WITH QUICK DRILL N 04:00 - 05:00 1.00 STWHIP N 12,498.00 WEXIT MAKE UP WHIPSTOCK BHA#11 - HOLD PJSM WITH CREW - MAKE UP BHA - TEST QTS TO 3500 PSI -GOOD OPEN EDC Printed 7/25/2019 9:34:OOAM "All depths reported in Drillers Depths" Common Well Name: F-48 Event Type: RE-ENTER- ONSHORE(RON) Project: PBU North America - ALASKA - BP Operation Summary Report Start Date. 6/30/2019 Site: F End Date 7/21/2019 AFE No X3-019CR-C:(2,778,074.00) 7/21/2019 Page Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Ars Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 05:00 - 16:00 11.00 STWHIP N 12,470.00 WEXIT RUN IN HOLE WITH WHIPSTOCK BHA#11 0.30 BPM IN 10.75 BPM OUTAT 784 PSI NOTE: PUMP TRIPS SET AT 930 PER CON # 13 —HOLD KWT DRILL WHILE RIH"' - LOG TIE IN - LOG DOES NOT LOOK LIKE ANYTHING WE HAVE LOGGED BEFORE, PU TO 12300' AND RELOG -CORRECT DEPTH -21', SWAP TOOL OVER TO CCLAND LOG CCL FROM 12300 TO 12490 -- WEARE ON DEPTH WITH THE CCL LOG FROM THE ODN, SEND CCL LOGS TO ODE - ODE AGREES WE ARE ON DEPTH, RIH TO 12493' AND GET UP WT WITH NO PUMP - RIH TO 12493, PU TO 5K LESS THAN UP WT AND STOP - TAG AT 12490', PU AND TAG AT SAME DEPTH, 3' HIGHER THAN PLAN PLACING THE T' COLLAR 2' INTO OUR WINDOW, CALL ODE - DECISION MADE TO SET WS HIGHER WITH THE T COLLAR BELOW THE BOTTOM OF THE WINDOW ' - NO OCN TO SET THE TOWS AT 12465' .- RECEIVE LEVEL I DON, REPLY AND SET WS AS PER DON #14 - RIH TO 12483(TOWSAT 12465'), PU WT= 54K, RIH TO 12483, PU TO 49KAND STOP. CLOSE EDC AND SET WS - WS SET AT 3600 PSI, SET DOWN 1 K. WS IS SET, PU OFF WS AND OPEN EDC - ONLINE WITH KCL AT MAX RATE - POOH DISPLACING TO KCL - STOPAT 12130.10' FOR A 12050.0' EOP FLAG THEN POOH - FLOW CHECK WELL —REVIEW - GOOD NO FLOW, TAG UPAND LD THE WS RUNNING TOOLS -TOOLS LD AND INSPECTED 16:00 - 21:15 5.25 STWHIP N 12,470.00 NEXT CEMENTING OPERATIONS - REMOVE BHI FLOATS FROM UOC - MU NOZZLE BHA WITH 1 JT OF PH6 - RIH WITH CMT BHA - CORRECT AT FLAG AT 12130 CORRECTION' -30' - UP WT 50K / DOWN Wr 24K -TAG PINCH POINT AT 12473' - PICK UP 10' OFF WHIPSTOCK AND PAINT FLAG Printed 7/25/2019 9:34:OOAM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 26 6111,15 Common Well Name. F-48 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date'. 6/30/2019 `end Date'. 7/21/2019 X3-019CR-C. (2,778 074 00 ) Project: PBU Site: F Rig Name/No.: CDR -2 Spud DateMme: 7/11/1991 12:00:OOAM Rig Release: 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. _ BPUOI: USA00000765 Active datum: KB @64.83usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ (hr) _ __.. (usft) 21:15 - 00:00 2.75 STWHIP N 12,470.00 WEXIT —. - CEMENT WHIPSTOCK - PRESSURE TEST SLB TO CUSTOMER VALVE TO 250/4000 PSI. -PERFORM INJECTION TEST �- i BPM WITH CHOKE OPEN 1.03 BPM IN / 0.99 ,OUT AT 281 PSI -CLOSE CHOKE PUMP 1 BPM AT 1360 PSI. -- HOLD PJSM WITH CREWS - BATCH UP 19 BBLS OF 15.8 PPG CEMENT - SET ELECTRONIC TRIP AT 2500 PSI ON CEMENT UNITAND TEST SAME GOOD. VERIFY MECHANICAL TRIP SET AT 4950 PSI - RUN INTO PINCH POINTAT 12473' PICK UP TO TOWS AT 12465' - PUMP 10 BBLS OF CEMENT AT 2 BPM AT 1000 PSI - TAKE OVER WITH RIG AND PUMP 5 BBLS OF KCLAT 1 BPM AT 600 PSI. - FLUSH LINES TO CEMENT UNIT WITH CONTAM PILL - PUMP 54.5 BBLS OF POWERVIS CONTAM PILL (CEMENT 1 BBL OUT OF NOZZLE) AT 2 BPM 800-950 PSI (AT 55 BBLS OF TOTAL DISPLACEMENT SLOW PUMP TO 1 BPM. '- PUMPING AT 1 BPM POOH LAYING IN CEMENT FOR 1 - PULL UP HOLE TO 11836' - LOSE 0.5 BBLS FROM TIME CEMENT WAS OUT NOZZLE UNTIL CHOKE CLOSED AT 11836' - BULL HEAD AT 1 BPM REACHING 2000 PSI AT 1.5 BBLS AWAY, DISCUSS WITH ODE, SLOW PUMPS TO 0.1-0.2 BPM AND MAINTAIN PRESSURE AT 2000 PSI UNTIL 4 BBLS ARE BULLHEADED. - BLEED OF CHOKE PRESSURE TO ZERO -PUMPAT4BPMIN/4BPM OUTAT2860PSI AND WASH DOWN FROM 11836' TO 12460' THREE TIMES. 7/16/2019 00:00 - 01:15 1.25 STWHIP N 12,498.00 WEXIT CEMENT WHIPSTOCK -PUMPAT48PMIN/4BPM OUTAT2860PSI AND WASH DOWN FROM 11836' TO 12460' THREE TIMES. 01:15 - 0415 3.00 STWHIP N 12,470A0 WEXIT POOH - PUMP AT 4.24 BPM IN / 4.0 BPM OUT AT 2482 PSI. - SLOW DOWN AT JEWELRY TO ENSURE GOOD FLUSHING - MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING NON SHEARABLES INTO THE .. _BOPS.. 04:15 - 06:00 1.75 STWHIP N 12,470.00 WEXIT BHA OPERATIONS - HOLD PJSM WITH CREW. -BREAK INJECTOR. - INSPECT LAST 50' OF COIL. - LAY DOWN CEMENTING BHA.. - INSTALL FLOATS IN LOC. - MADE UP NOZZLE AND MAKE UP LUBRICATOR. - TEST FLOATS TO 3500 PSI -GOOD - JET STACK AT 4 BPM - PU INJECTOR AND LD NOZZLE Printed 7/252019 9:34:o9AM **All depths reported in Drillers Depths** North America - ALASKA - SP Page 27 Operation Summary Report Common Well Name. F-46 AFE No Event Type. RE-ENTER- ONSHORE (RON) Start Date: 6/30/2019 End Date 7/21/2019 X3-019CR-C: (2,778,074,00) Project: PBU Site: F Rig Name/No.: CDR -2 Spud DateRme: 7/11/1991 12:00.00AM Rig Release. 7/21/2019 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000765 Active datum: KS @64.83usR (above Mean Sea Level) Date From- To Him Task Code NPT Total Depth Phase Description of Operations _(hr) _ Nall)._. 06:00 - 11:30 5.50 STWHIP N 12,470.00 WEXIT WINDOW MILLING OPS - PJSM TO MU THE MILLING BHA - MU THE BHA WITH 0.6° BENT MOTOR - BHA RAN, SOMETHING IS WRONG WITH THE INJECTOR -HOLD KICK WHILE MU BHA DRILL - PU THE SAFETY JOING AND DEPLOY THE NON-SHEARABLE BHA BELOW THE BOP'S "'WELL SECURED WITH SAFETY JOINT IN 7:47 ALL HANDS CALLED IN FROM THEIR STATIONS IN 8:05- :05-i- i -INJECTOR DIAGNOSIS IS OK LD SAFETY JOINTAND MU THE INJECTOR - RIH WITH MILLING BHA '- 12400 LOG TIE IN - CORRECT DEPTH -19' - CLOSE EDC, BRING PUMPS UP TO RATE ANOGETWT'SAT2.9BPM,UPWT=50K RIH WT=21K CIRCPSI=2080PSI -WASH DOWN LOOKING FOR CMT FROM , 12460 TO 12470', OCN REQUIRED 50 PSI 11:30 - 1430 3.00 STWHIP N 12,470.00 WEXIT WINDOW MILLING OPS . -TAG PINCH POINTAT 12469.68' WITH KCL - PU CHASING GREEN CMT TO THE TUBING TAIL, OPEN EDC TO DISPLACE COIL & WELL TO MUD TAKING RETURNS TO THE TIGER TANK - BOTTOMS UP BRING RETURNS INSIDE -GET PARAMETERS ASTART MILLING THE WINDOWAS PER PLAN & BOT - TAG PINCH POINT AT 12470.3 (SWAPPED OVER TO MUD 2ND 14:30 - 00:00 9.50 STWHIP N 12,475.00 WEXIT MILL WINDOW FOR 12470.4 TO 12475.4 IN RATE = 3.02 BPM OUT RATE = 2.06 BPM -CIRC PRESSURE= 2650 PSI W013=1.7- OB=1.7- 3.4K 3.4K 7/17/2019 00:00 - 01:45 1.75 STWHIP N 12,476.30 WEXIT _. MILL WINDOW FROM 12475.4 TO 12476.3 -IN RATE =2.92 BPM OUT RATE =2.96 BPM _ -CIRC PRESSURE=2863 PSI WOB=3-3.5K 01:45 - 05:00 3.25 STWHIP N 12,487.00 WEXIT MILL RAT HOLE FROM 12476.3' TO 12487' -IN RATE =2.92 BPM OUT RATE =2.96 BPM - CIRC PRESSURE = 2863 PSI WOB = 1.3 - 3.8K - TIME MILL FIRST FOOTAT VEER HOUR - PUMP 10 X 10 BBL HI/LO VIS SWEEP - REAM AT 0° TOOL FACE -CLEAN - REAM AT 15` RIGHT TOOL FACE -CLEAN - REAM AT 15° LEFT TOOL FACE -CLEAN _ - DRY DRIFT WINDOW -CLEAN 05'.00 - 10:00 5.00 STWHIP N 12,487.00 WEXIT POOH WITH WINDOW MILLING BHA - OPEN EDC - DYNAMIC FLOW CHECKAT 0.25 BPM IN / 0.25 BPM OUT GOOD - PUMPAT4.04 BPM IN/ 3.63 BPM OUTAT 3129 PSI - PAINT WHITE FLAG AT 12437.32 BIT DEPTH / 12298.9' EOP DEPTH - FLOW CHECK AT SURFACE - GOOD NO FLOW, LD THE BHA - MILLS GAUGED WINDOW = 3.76 GO 3.75 NO GO STRING 3.80 GO 3.79 NO GO Printed 7/25/2019 9:34.00AM **All depths reported in Drillers Depths" TREE= 4-1/16"CJW WELLHEAD= 133/8"FMC ACTUATOR= BAKER OKB- EE/ = 64.83' BF. ELEV = 35.71' KOP= 1800' Max Angle = 57" @ 4628' L>atum MD= 12504' Datum TVD= 8800 -SS 9-58" CSG, 47# L-80 HYD 563, D = 9.875- i3 -3/e" CSG, 66#, NT -80 BUTT, D = 12.415" Minimum ID = 3.805" @ 12245' 4-1/2" PARKER SWN MILLED NIP 4-1/2• TBG, 12.8#, 13CR-80 VAMTOP, 12153' .0152 bpf, D=3.958" w Q F— SAFETY NOTES. "`CHROME TBG & LNR"' if' v NOTE HISTORICAL PROBLEMS RETRIEVING TOOLS THRU THE TAILPIPE DEFORMITY/ OBSTRUCTIONS DMY IDENTIFIED ON BHTV SURVEY 08/02192 0 1732' 9-5/8^ HES f5? CEMENIH2 8144 2067' 4-12" HES X NP. ID= 3.813" Ilil�]•tL/I70itt'I�174!•1�/^l Ll�cii■�I�I 4 6122 4772 52 141IG DMY RK 0 3 8144 1110&18 BTNJ SEF BKR BP(11101/18) 53 MMG DW RK 0 BP Exploration (Alaska) 11/14/18 DDJMD ADDED BF & 20" GOND DEPm 148 49 MMG DW I I S 10 1 11092 791589115 MMG DMY RIC 12046' 4-12" HES X NP. D = 3.813" 9-518" X4-12" CR S-3 PKR. D = 3.870" l 9 r1 _ .12166' —{ 9-58" X4-12" uNDUE OvEmHoT 12161' I 12169' RIGHT-HAND RELEASE LATCH 12170' 9-5/8' X4-12" 7IW HBBP PKR D = 3 TOP OF 7" LNR —12196- j_4 -1/2 -TBG, 12.6#, NT13-CR 0152 bpf, D = 3.958^ 9-58• CSG, 47#, NT -80S NSCC, D = 8.681' 12461' 4-12• X 7• DELTA WHIPSTOCK C— /19) 12466' PERFORATION SUMMARY REF LOG: HLS BHCS ON 07/2981 ANGLE AT TOP PERF: 48" @ 12480' Note: Refer to Production DB for historical pert data I SIZE I SPF I INTERVAL I Oon/Soz I SHOT I SOZ I 3-38" 1 6 112653 - 126 8 C 109210 7/891 PBTD — 13093' J- 7" LNR 26#, 13CR-80, .0383 bpf, D = 6.276" 13176' 19-5/6- X 7• TNV LNR HGR D =? 14-12" PARKER SWS NP, D = 3.813- 12245, 14-12" PARKER SWM NP MLLED TO 3.805" (6115/19) 1 lzzor Iia-vz-vvLEG. o=3.9s6•I 12257' ELMDTTLOGGEIDO /91 7 " MLLOUT WINDOW (F4" 1247V -' j 12970' TOC PLUG (06/17/19) 1-1/2" POSISET RUG (06/17/19) PRUIDHOE BAY UNIT WELL F-48 PEIWT No: 9910860 API No: 50-029-22187-00 SEC 2, TIIN, R1 3F, 3362 FSL &286T FEL DATE REV BY I COMMENTS DATE REV BY COMV8NI5 06/04/91 N18E ORIGINALCOMPLIETON 12118!18 CJNJM) PULLED IBFVIBPSTOP& REMOVEDF& 1022107 M4E8 RWO 12/18/18 JPKIJMD GLV aO(06/08!18) 1110&18 BTNJ SEF BKR BP(11101/18) 12718/18 JM J GLV GO (1286/18) 11!06118 RCB/SET BP STOP(11/04/18)EEI 06/05/19 JPK/JMD GLV C/O (05/22119) 11/07118RC8/J ADDED BP STOP D(11/07/18) 0624/19 BTWJMD MILL XN NP, SET PLUG&TOC BP Exploration (Alaska) 11/14/18 DDJMD ADDED BF & 20" GOND DEPm 07/15/19 JNJJMD SET v*w.TrOCK & MLL OT THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Sean Mclaughlin Engineering Team Leader—CTD & RWO BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU F-48 Permit to Drill Number: 191-086 Sundry Number: 319-333 Dear Mr. McLaughlin: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www, a o g c c. a l a s k a. g o v Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely,� `'7 (/Vlam` l' -- Jessie L. Chmielowski Commissioner DATED this I �+ day of July, 2019. RBDMStkVJUL 19 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 a %i (c;�6VF.." 7(,, 7l /9 JUL 15 2019 1. Type of Request Abandon Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ DPFfCti.i Suspend ❑ .u6 Perforate ❑ Other Stimulate ❑ Pull Tubing 13 Change Approved Program 0 Plug for Redrill (/� Perfite New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other ❑ 2. Operator Name: SP Exploration (Alaska), Inc 4, Current Well Class:5. Exploratory ❑ Development • Permit to Drill Number 191-086 3, Address: P.O. Box 196612 Anchorage, AK 6. API Number 50-029-22187-00-00 99519-6612 Stretigraphic ❑ Service ❑ 7. If perforating: 8. Well Name and Number What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes ❑ No 0 PBU F48 9. Property Designation (Lease Number): 10. FielNPools: ADL 028280. 028277'& 028278 PRUDHOE BAY, PRUDHOE OIL ' 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (In: Total Depth TVD(ft): Effective Depth MD'. Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 13175 9307 12496 6859 12496,12540,12550 12533,12540 Casing Length Size MD TVD Buret Collapse Structural Conductor 80 20" 32-112 29-112 Surface 2724 13-3/8" 31 -2755 31-2678 5020 2260 Intermediate 12432 1 9-5/8" 29-12461 29-8836 8870 4760 Production Liner 981 T 12195 - 13175 8655-9307 8160 7020 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 1 12480. 12878 8849-8981 4-1/2" 12.6# 13Cr80 27-12257 Packers and SSSV Type: 4-12" Baker S-3 Packer Packers and SSSV MD (ft) and TVD (ft): 12071 18572 4-1/2" TI W HBBP Parker 12170 / 8639 12. Attachments: Proposal Summary 0 Wellbore Schematic 0 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch 0 Exploratory ❑ Stratigraphic ❑ Development 0 Service ❑ 14. Estimated Date for Commencing Operations: June 30, 2018 15. Well Status after proposed work: i Oil ❑ WINJ ❑ WDSPL ❑ Suspended V 16. Verbal Approval: Date: 7/15/2019 ' GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: Mel Rixse GINJ ❑ Op Shutdown ❑ Abandoned 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Ciolkosz, Ryan R be deviated from without prior written approval. Contact Email: Ryan.Ciolkosz(Qbp.com Authorized Name: McLaughlin, Sean Contact Phone: +1 907 564 5977 Authorized Title: Engineering Team Leader- CTD & RWO Authorized Signature: �y • It,r Date: 7-15--111 M ��l COMMISSION USE ONLY ^ Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 71 I /1 ' 'M 5 U1 Plug Integrity ❑ L BOP Test ❑ % Mechanical Integrity Test ❑1r Location Clearance ❑ ,} rlh� �J%�C`U� Other:A''7'�/'� 2/C/Ii g{4eC iUlt N.i ��i2!(lEp�/' ZOJT�� Post Initial Injection MIT Req'd? Yes ❑/ No ❑ Spacing Exception Required? Yes ❑ No t.Y Subsequent Form Required: 18-4 Q'7- - APPROVED BYTHE Approved by: COMMISSIONER COMMISSION Date ORIGINAL -1B°MSL�UL192019 M'P-t$%4-•tr/T�Ci Submit Form and Form 10403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate 'i'-rGja16'119 1> 't I 'M To: Alaska Oil & Gas Conservation Commission �C'C_r��"�} From: Ryan Ciolkosz j'►�' b p CTD Engineer Date: July 15, 2019 Re: F-48 Sundry Approval is requested at abandon the F-48 perforations The parent well, F-48, has no remaining value and there are no good opportunities to add new perforations to improve well performance. Proposed plan: Drill a through tubing sidetrack with the CDR 2 coil tubing drilling rig on or around July 16th, 2019. CDR 2 will set a whipstock and downsqueeze cement into the F-48 perforations and F-48APB1, then mill a 3.80" window through the 7" casing and drill the F -48A Sag lateral. CDR2 will then run slotted liner and set a billet at 12647' MD. The rig will then drill F -48A Ll, a second lateral, and complete with a slotted liner tied back into the F - 48A parent bore. CTD Drill and Complete F -48A & F-48AL3 program Rig Work: 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. (MASP 2254psi) 2. Set Whipstock and down squeeze cement around whipstock. Mill 3.80" window and 10' of rathole. Swap to 8.6 drilling mud 3. Drill 4-1/4" Build and lateral with GR/Resistivity to F -48A TD 4. Run 2-7/8" 6.4# L-80 Solid/Slotted liner to within "'650' of TD 5. Set flow through billet at 12647' MD 6. Drill L14-1/4" build and lateral with GR/Resistivity to F-48AL1 TD 7. Run Solid/Slotted 2-7/8" 6.4# L-80 liner to within "'150' of TD 8. Freeze protect well, RDMO Post -Rig Work: 1. V: Pull BPV if set. Tree Work as necessary 2. S: Set Live GLVs. 3. T: New well flowback up to 5 days Ryan Ciolkosz CC: Well File CTD Engineer Joseph Lastufka 564-5977 TRff= 4-1116"CNV WELLHEAD= 13 -SW FMC ACTUATOR= BAK62 OKE. ELE/ = MAY BF. ELEV = 35.71' KOP= 1800' Max An01e = 57' @ 4628' Datum MD= 125D4' Datum TVD = 88o0'ss, R&R -A ID= -.I -80 HY D 563,10 = 9.875' NT -110 BUTT. ID =12.415' 1 112' 1 Minimum ID = 3.805" @ 12245' 4-112" PARKER SWN MILLED NIP 4-12" TBG, 12.68,13CR-80 VAM TOP, .0152 bpf, D = 3.956' 4-12" TBG STUB (10/11/07 4-12' TBG, 12.6AI, K"3 -CR .0152 bof. D=3.958' NT -BGS PSCC, D = 8.681' 12496' PERFORATIONSUMMARY REF LOG: HLS BRCS ON 072991 ANGLEATTOP Pf32F: 48' @ 1248V Note: Refer to PFoductim DB for historical pert data SIZE SPF INTERVAL Opr9ScIz SHOT SOZ 2-79' 6 12480-12530 O 1222/16 2-5/8' 6 12480-12510 O 03/1992 3-3/8' 6 12653-12678 C 092791 7 - Pero = 6 276' FA Q8 SAFETY NOTES: "'CHROME TBG& LNR"` i}NOTE: HISTORICAL PROBLEMS RETRIEVING TOOLS THRU THE TAILPIPE DEFORMITY/ OBSTRUCTIONS I Dp 1 IDENTIFIED ON BHN SURVEY 08102192 HES X NIP, ID = 3.81: GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH POITT DATE 5 3126 2976 41 MMG DMYLRKO 06/05/19 JPK/JMD GLV GO (0522/19) 0522/19 4 6122 4772 52 MAG DMY03/09/08 3 8144 5968 53 MAG DMY0522/19 2 9721 6987 49 MMM OW1021107 1 11092 7915 48 MAG DMY0522/19 12156' -j9-5/8'X4-12" UNIQUE OVERSHOT 12169' PoGHT-HRNO RELEASE LATCH 12170' 9-518"X4-1/2" TIW HBBP PKR ID = X 7- TBV LNR HGR. ID = 7 12245' I-14-12- PARKER SWN P6'MLL®TO 3.805•(6115/19) 1 12257' H4-1/2"WLEG, I0=3.958- I 12257' ELMD TT LOGGED 0927191 PRUDHOE BAY UNIT WELL F-48 PHIAITNo:91910860 ARNo: 50-029-22187-00 SEC 2, T11 N. Rl3F 3362' FSL & 2863' FEL DATE RE/ BY COMABJTS DATE REV BY CDMABYTS 080491 N18E ORIGINAL COMPLETION 12/18/18 CIWJMD PULLED BP1BP STOP &REMOVEDRS 101221/7 WES RWO 12/18/18 JPK/JMD GLV CAD(owat18) 11106/18 BTWJMD SET BKR BP(11/01/18) 12/18/18J"JMDGLV0O(12106/18) 11/06/18 RCB1JAD SET BP STOP(11/04/18) 06/05/19 JPK/JMD GLV GO (0522/19) 11/07/18 RCBUMD ADDED BP STOP D (11/07/18) 0624119 BTPVJMD LILL XN NP, SET PLUG & TOC SP Exploration (Alaska) 11/14/18 DLVJMD ADDED BF & 20' CDND DEPTH 07/15/19 JNUJMD SET mi-sTOCK & MILL OH Well 919hole CDR2-AC 4 Ram BOP Schematic Date 21-NOV-17 Quick Test Sub to Otis -Y.1 h - — Top of 7" Otis 0.0R --—.—.—.— -- — _ _. _._. �CDa2 Rug's Oda ern Distances from top of riser Excluding quick4est sub �- 71118" 6k Flange x T' Olio Box Top of Annular 6.0 ft Al 7111 Top of Annular Element B.7ft Annular' Bottom Annular CL Blind/Shears 9.3R CL 2-3/8" Pipe/Slips 10.1 h 61 82 a) er Choke tine Kill Line - CL 2-318" x 3-1/2" VBRs CL 24/8" Pipe/Slips CL of Top Swab CL of Flow Cross CL of Master LDS LDS (Ground Level i—� 13.4 ft � Master Hose Rixse, Melvin G (CED) From: Ciolkosz, Ryan R <Ryan.Ciolkosz@bp.com> Sent: Wednesday, July 17, 2019 1:37 PM To: Rixse, Melvin G (CED) Cc: Lastufka, Joseph N; Sperry, Nathan Subject: PTD #219-068 Variance Request Mel, as discussed we would like to request a variance for alternate plug placement per 20AAC 25.211(i) The remainder of the F-48 perfs were squeezed with 4 bbls of cement at 2000 psi and an injection rate of 0.1 bpm. Thanks, Ryan Ciolkosz 9072444357 Sundry Application Plug for Re -drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re - drilled. Those wells that are not re -drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task --Respoimible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box Geologist in the upper left corner of Form 10-403 is checked. If the "Abandon" or E "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Geologist work) the initial reviewer will cross out that erroneous entry and initial the it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, check the "Suspended" box and initial that change. Drilling Engineer The drilling engin6ers will serve as quality control for steps I and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, they will enter the Typ_Work code "IPBRD" into the ' History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re -drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding" user query Geologist in RBDMS to ensure that 0 of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. 1,000,000 L C 100,000 1z 10 Jan -1990 BP Exploration (Alaska) Inc., PRUDHOE BAY UNIT F-48 (191-086) PRUDHOE BAY, PRUDHOE OIL Monthly Production Rates Jan -1995 - !an -2000 Jan -2005 Jan -2010 Jan -2015 e Produced Gas (MCFM) . GOR — Produced Water (BOPM) —e— Produced Oil (BOPM) 1,000,000 d 'm 100,000 0 O 0 3 10,000 S 0 Co 1,000 00 C d fD CD R) 100 0 s 10 Jan -2020 SPREADSHEET_1910860_PBU_F-48_Prod_Cu"es_W ell_Oi I_V120_20190716.xlsx 7/16/2019 Cum. Prod Gas (mcf r� a t SEE Mi::�___ 1�� AN ■EliME ■■ ■ ■ r ■111m� 01111100 __ OWMNI 1111 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■ Jan -1995 - !an -2000 Jan -2005 Jan -2010 Jan -2015 e Produced Gas (MCFM) . GOR — Produced Water (BOPM) —e— Produced Oil (BOPM) 1,000,000 d 'm 100,000 0 O 0 3 10,000 S 0 Co 1,000 00 C d fD CD R) 100 0 s 10 Jan -2020 SPREADSHEET_1910860_PBU_F-48_Prod_Cu"es_W ell_Oi I_V120_20190716.xlsx 7/16/2019 • STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMI SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate Q Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 191-086 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22187-00-00 7. Property Designation(Lease Number): ADL 0028278 8. Well Name and Number: PRUDHOE BAY UNIT F-48 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 13175 feet Plugs measured feet JAN vertical 9307 feet Junk measured 12533/12540 feet JAN 1 2 2017 Effective Depth: measured 13097 feet Packer measured 12070/12170 feet true vertical 9256 feet Packer true vertical 8570.97/8638.51 feet JG CC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"Conductor 31 -111 31 -111 Surface 2727 13-3/8"68#NT-80 30-2757 30-2680 5020 2260 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 12480 12510 feet 12510-12530 feet 12653-12678 feet _ True vertical depth: 8849-8869 feet feet 8869-8882 feet 8964-8981 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED � R 2U1? Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well 184 operation: 151 1451 1739 177 p 5 Subsequent to operation: 274 584 3628 1586 181 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory 0 Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature id Phone +1 907 564 4424 Date 1/12/17 VTt- 2f « /r ROOMS �' JAN Form 10-404 Revised 5/2015 � 7 15 2017 Submit Original Only • Q, 00000000 m CO CD CD COTNOO U NOOOOv8M00 CO CO CNI Co Ca CD CO CO � CO CO CO o to v O N- r- CO CO to O) CO 0 CO C) CD f� Nt NC N CO CO CO N LC) CA CA O CO CO CI 1 1 1 1 1 1 1 1 1 F NI- LC) 0 M O 0') to to LC) CO I,- Cr) M N t� CO N CO CO N CC) 4.1 C � r O 00 I- w e- r- toOCD (' N- CD U) LL � N � NMMMNN V ~ 0 03 , 2 Q Ntc) 'Cr N r O O to CO CA MCO M M N N- N (NI N = M• QQ W I— O ` � O (nO 00`000`0 OF' 000O0000303UU � ZJZZ0 C * cr) ce) C 00 N r CO CD . ea n14" N N ~ in O CO . *k N N U 0D � CO U OM � aO � NNN CA i .4- .c.cI's 00 CDONNOOto C cor- 1-- CN 0) N r LO CO O C W W Ct Q Q Q Ca CO W W W W (15 U octu_ ctc[ Cerazz Z W W W W W m m O DHHF- ZZDD O (nZZZ � JHF- S • Packers and SSV's Attachment PRUDHOE BAY UNIT F-48 SW Name Type MD TVD Depscription F-48 TBG PACKER 12070.08 8570.97 4-1/2" Baker S-3 Perm Packer F-48 TBG PACKER 12169.9 8638.51 4-1/2"TIW HBBP Packer • • o o 0 � } H ~ NW u w 0 d i- 2 c H m coo Cn mw c') o m Q ;_ w c i c'.i� c .` 0 W O d v ©� a0 ui co C132 3 cm ~ CO m y II 0 -i p .0 ci) J CL CV • �� H � F- (n 12 J D (nom * U g 0u °J' ZLU CL Ov ? E.-c _�jV I- - _ D < 0 0 mNl ' E o OZ ' p~ LLQ ? Ow dcO F- ~ � a = � Qv O 0o ' u Ow Oao Q (nrt o Q = II 0 \ a w Qopa Co it c�IQ OE- 1- 2w < w0 0 .4C >' o rnw LL (C) � o = za m 00:0- ~ ~ w c N wu_ ~ 0 = QJV -r c0 LU E i ' a owW = co ado oO OUZ u MZ E a) JAI"' N w (nU `- D W O N II O , 0_ a ! OQO �o zo _ . 00 2 '�? cn m . (Ow � I- O ? (n W (0Z - J o 11J Ce Och (n ~ 0 co Jwd o � apWX �n QHH F- II W T " OW 7 d maO Mm = � 0J -- -IIQ * CO x JQ Q Q � pw Emsi , DwzwOz * oo Uz m * D <o_ N 1 * � o tl0_ <D J W ° NN UW ,C W JvotS � Q � oQwcq I- D ' (9 ( U2NWU og C = > c _ a > > w Jm °�° U w ? OU 0- 3pI- cn c II C70I- J o ON (n CD QEta' } a IQwaQa0C OZDpNNJN2w o - F- 25 m W Ea = za;o0 liI- g12 - O O0 °° O,rmF- �0n >' a p520 � ` > OMIL WD = 0r; ' WOlia Nw = N * = z o u o.. (5 co WI- LU CI zz . 025 2 xm m - � 0 xvOww = (DOLLNw > O ° fnm' m ZN0 = H = Q Nm = = H � mwcli) w W M co I--. N O = w Z_ Z_ _ W w J J JOac� LND RD -§ (nz = U -§ w = HH § w = Jpa u_ LL QOwao Jo _0oJ � a• t0F- E = QW WHUU WOW F O o W •Cr) W III 3 3lj `- wLCjZ (n JONu_ ZmmcM � � ZOJm co a) * << 4: =a5 DHNL > > Q � ww00 ? = ww0Zo co -c13 ccw : 1- 4T, 3 « ccQ - 17Oao F : : tYaai= cli : o20 w H o 0 0 CO 0 � E. 0 E. 0 0 1-_ CV N m CO 0 >F- N N N N 0 a- U Q S TREE= 4-1/16°CNV ,1AH LFEAD= 13-5/8"FMC F NOTE HNOTES: _STTORI,CAL PROBLEMS RETRIEVING TOOLS ACTUATOR= BAKER OKge ELEV= 64.83' THRU H=TAILPIPE DEFORMITY/OBSTRUCTIONS BF.F1EV= 37.13 I I 'THE IDENTIRED ON BHTV SURVEY 08/02/92 KOP= 1800' Max Angle= 57°@ 4628' —"CONDUCTOR. ? 1732' H 9-5/8'HES ES CEMENTER Datum MD= 12504' #, , Datum ND= 8800 SS D= ' ' 2057' H4-1/2"FES X NP,D=3.813' 9-5/8°CSG,47#L-80 HY D 563,D=9.875" --f 1742' GAS LFT MANDRaS 13-3/8'CSG,68#,NT-80 BUTT,D=12.415' —I 2755' ST MD ND DEV TYPE VLV LATCH PORT DATE 5 3126 2976 41 MMG DOME RK 16 03/09/08 L 4 6122 4772 52 MMG DMY RK 0 03/09/08 3 8144 5968 53 MMG DOME RK 16 03/09/08 Minimum ID =3.725" @ 12245' 2 9721 6967 49 MM3 DMY RK 0 10/21/07 4-1/2" PARKER SWN NIPPLE 1 11092 7915 48 MM3 SO RK 20 03/09/08 I ' 12045' H4-1/2" Z X 12065' --19-5/8"X4-112"S-3 PKR,D=3.870" 4-1/2"TBG; 12.6#,13CR-80 VAM TOP, — 12153' \ ' 12090' —I4-112"FES X NP,D=3.813" .0152 bpf,ID=3.958" 12163' 1H 9-518 X4-1/2"UNIQUE OVERSHOT I 4-1!2"TBG STUB(10/11/07) —+ 12161' 4 .1 ,,,,•1 12169' —IRIGKT-HAND RELEASE LATCH Z X 12170' H9-5/8"X4-1/2"TIW HBBP PKR,ID=3.875" TOP OF 7"LNR —1 12195' 12195' H9-5/8"X 7"T1W LNR HGR,ID=? ' , 12223' —14-1/2"PARKER SWS NIP,D=3.813" ' 12245' H4-112"PARKER SWN NIP,D=3.725" 4-112'TBG, 12.6#,NT13-CR,—{ 12257' / \ 12257' —14-1/2"WLEG,D=3.958" .0152 bpf,D=3.958" 12257' H ELMD TT LOGGED 09/27/91 i 4111 9-5/8'CSG,47#,NT-80S NSCC,ID=8.681° —{ 12461' , ? H RSH- STFFNER RING FROM IBP(11/03/14) PERFORATION SUMMARY _ ? H FISH- 6"SEALING ELEMENT FROM BP(01/25/15) REF LOG: I-LS BRCS ON 07/29/91 ANGLE AT TOP PERF: 48°@ 12480' Nbte:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz SHOT SOZ 2-7/8" 6 12480- 12530 0 12/22/16 I 2-5/8" 6 12480- 12510 0 03/19/92 3-3/8" 6 12653-12678 0 09/27/91 PBTD H 13093' ' •�•�•�1�•�•�•�•4 7"LNR,26#,13CR-80,.0383 bpf,D=6.276" --{ 13175' .1�tt.iMW� i DATE FEV BY COMMENTS DATE REV BY COMMENTS FRLDHOE BAY UNI 08/04/91 N18E ORIGINAL COMPLETION 11/03/14 GTW/PJC FISH DH(BP DEBRIS) WELL: F-48 10/22/07 N4BS RWO 11/05/14 SWC/PJC FISH:STFNE32 RING STILL DH PERMIT No: 1910860 11/19/07 JLJ/PJC GLV C/O(11/13107) 01/05/15 CJS/JMD SET BP(12/26/14) AR No: 50-029-22187-00 11/21/07 RWUPJC DRG DRAFT CORRECTIONS 01/28/15 JLS/JMD PULL IBRSET FISH(01/25/15) SEC 2,T11N,R13E 3362 FSL&2863' FEL 03/18/08 KSB/TLH GLV C/O(03/09/08) 12/27/16 JUJMD ADPERFS(12/22/16) 11/14/13 DI/VR/JMC CORRECTHD 4-12"TYPO DEPTH BP Exploration(Alaska) Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color items - Pages: Grayscale, halftones, pictures, graphs, charts - Pages: Poor Quality Original- Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. Other, No/Type OVERSIZED Logs 'of vadous kinds . Other COMMENTS: Scanned by: (~ Dianna Vincent Nathan Lowell [] TO RE-SCAN Notes: - Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: /si UNSCANNED, OVERSIZED MATERIALS AVAILABLE: j ql ()g(; FILE # 1 {) /1'(",--( r'n M ( 5c, 'í wy /Jt:;f (Ef/. t+ To request any/all of the above information, please contact: Alaska Oil & Gas Conservation Commission i 333 W. 7th Ave., Ste. 1 00 ~ Anchorage, Alaska 99501 Voice (907) 279-1433 ~Fax (907) 276-7542 • STATE OF ALASKA ~ tea' ^~i1 R~~C~ V ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS NQV 3 Q 2007 ~tlASlt7 nl+ ~ r+er lnnw.. f'......~t 1. Operations Performed: AfIChOrB~~gg ^ Abandon ®Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Susperitled Welty ^ Alter Casing ®Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other ^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ®Development ^ Exploratory 191-088 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22187-00-00 7. KB Elevation (ft): ~ 83, , 9. Well Name and Number: PBU F-48 8. Property Designation: 10. Field /Pool(s): - ADL 028278 ` Prudhoe Bay Field / Prudhoe Bay Pool 11. Present well condition summary Total depth: measured 13175 ~ feet true vertical 9307 - feet Plugs (measured) None Effective depth: measured 13097 feet Junk (measured) None true vertical 9256 feet Casing Length Size MD TVD Burst Collapse Structural Conductor Surface 2755' 13-3/8" 2755' 2678' ' "5020 2270 Intermediate 12461' 9-5/8" 12461' 8836' 6870 4760 Production Liner 980' 7" 12195' - 13175' 8655' - 9307' 7240 5410 ~~~~ ~~ ~~~ DEC ~ ~ Zfl07 Perforation Depth MD (ft): 12480' - 12678' Perforation Depth TVD (ft): 8849' - 8981' 4-1/2", 12.6# 13Cr80 & NT13Cr 12257' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 9-5/8" x 4-1/2" Baker'S-3' packer, ~ ~ - -~~ "° " 12065' 9-5/8" TIW 'HBBP' packer 12170' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final p ressure: Cut and pull tubing to 12161'. Cut and pull 9-5/8" to -1742'. Run 9-5/8" tieback to 1742' (47#, L-80). Cement tieback w/ 125 Bbls of Class 'G' 702 cu ft / 605 sx . Run new Chrome Tubin . 13. Re resentative Dail Avera a Production or In'ection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: Subsequent to operation: 251 657 1,019 1,420 190 14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work: ^ Exploratory ®Development ^ Service ® Daily Report of Well Operations 16. Well Status after work: ® Well Schematic Diagram ®Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact John Rose, 564-5271 307-181 Printed Name Terrie Hubble Title Drilling Technologist Prepared By Name/Number ~ l ~ Signature Phone 564-4628 Date ~ Terrie Hubble, 564-4628 ~+fl~ Form 10-404 Revised 04/2006 ~ a ~ ~~ Submit Original Only • Well History • Well Date Summary F-48 6/12/2007 ***WELL S/I ON ARRIVAL'**' (pre rwo ) DRIFT 3.805" CENT & 3.60" BELL GUIDE,PULLED PX-PRONG FROM 12142' SLM. ATTEMPTING TO PULL 4 1/2" PLUG BODY FROM 12145' SLM. ***JOB IN PROGRESS.*** F-48 6/13/2007 PULLED 4.5" PX PLUG FROM 12145' SLM. DRIFT W/ 3.805" CENT, TAG XN NIPPLE @ 12245' SLM. CALIPER TUBING FROM 12240' SLM TO SURFACE, RECOVER GOOD DATA. WELL S/I ON DEPARTURE. (NOTIFIED PAD OPERATOR) F-48 6/27/2007 T/IA/OA= Temp SI/1800/550 PPPOT-T (PASS) PPPOT-IC (FAIL) (PRE RIG ) PPPOT-T (PASS) RU high pressure bleed tool onto THA test void 50 psi bled to 0 psi. Cycled and torqued LDS "Standard" Flushed void until clean returns achieved, pressured void to 5000 psi for 30 minute test. 4950/ 15 minutes, 4900/ 30 minutes. Bled THA void to 0 psi RD test equipment PPPOT-IC (FAIL) RU high pressure bleed tool onto IC test void 550 psi bled to 0 psi. Cycled and torqued LDS "Standard" Flushed void until clean returns achieved pressured void to 3000 psi for 30 minute test. 2700/ 15 minutes, 2500/ 30 minutes. Bled IC test void back to 0 psi. Test void seems to track OA pressure showing Primary seals are bad secondary seals are holding. RD test equipment. F-48 10/2/2007 WELL SHUT-IN ON ARRIVAL. INITIAL T/I/O: 2200/580/550 UNABLE TO GET PAST 11250' WITH 4.5" FAS DRILL BRIDGE PLUG (MAX OD 3.66"). LRS PUMPED 200 BBLS CRUDE AND 50 BBLS DIESEL TO KNOCK DOWN WHP. T/I/O: 100!580/600. RUN JUNK BASKET WITH 3.7" GAUGE RING DOWN TO 12350'. JUNK BASKET SAT DOWN AT 11250', 11620', AND 11800'. WORKED THOUGH. JUNK BASKET CAME BACK 3/4 FILLED WITH ASPHALTINE. RUN SECOND JUNK BASKET DOWN TO 12350' WITH SAME 3 7n" GaurF RIND nin Nnr ciT nnwn~nti cFrnNn aiN wiTN JB RUN. PULLING OUT OF HOLE WITH SECOND JB RUN. JOB IN PROGRESS. F-48 10/2/2007 T/I/0=2100/580/560 Temp=S/I Assist E-Line (RWO Prep) Load TBG w/210 bbls of 50* crude and cap w/40 bbls of 60* diesel. Stand by for E'Line. Job In Progress. F-48 10/3/2007 Assist E-line MIT T Passed to 3500 psi./MIT IA Passed to 3500 psi (Pre-chem-cut for RWO Prep) MIT T presured up to 3500 psi with 3 bbls crude. T lost 150 psi in first 15 minutes and 50 psi in second 15 minutes. For a total of 200 psi in 30 minutes. Bled back -2 bbls. MIT IA presured up to 3500 psi with 91 bbls crude. IA lost 100 psi in first 15 minutes and 40 psi in second 15 minutes. For a total of 140 psi in 30 minutes. Bled back -7 bbls crude. Tagged wing, master and IA valves with info. Well left SI at departure with wing and lateral valves closed and flagged. Notified Operator of results. FWHP's=600/650/600 F-48 10/3/2007 RUN SECOND JUNK BASKET DOWN TO 12350' WITH SAME 3.70" GAUGE RING. DID NOT SIT DOWN ON SECOND RIH WITH JB RUN AND IT CAME BACK CLEAN. SET 4.5" FAS DRILL BRIDGE PLUG MID ELEMENT AT 12204'. SAT DOWN ON PLUG AFTER SETTING. BUT TUBING WITH 3.65" POWER JETCUTTER AT 12163'. FINAL T/I/O = 800/700/600 ***** JOB COMPLETED ***** F-48 10/5/2007 T/I/0=340/700/560 Circ. Out & FP /CMIT-TxIA to 3500 psi ****PASS**"* (RWO Prep) Pump 5 bbls neat meth, 1008 bbls 1 % kcl, & 160 bbls diesel down tbg taking returns up IA to FL. U-tube diesel TxIA for freeze protect. CMIT TxIA--Pump 12 bbls diesel down tbg to reach test pressure. TxIA lost 100/80 psi 1st 15 min, 40/20 psi 2nd 15 min, total loss of 140/100 psi in 30 min test. Passed. RD TBG, RU OA. JOB IN PROGRESS. F-48 10/6/2007 Set 4" CIW type H BPV, for rig work. F-48 10/6/2007 Circ. Out /MIT-OA to 2000 psi ****PASSED**** (RWO Prep) Pumped 11.3 bbls crude down OA for MIT to 2000 psi. OA lost 0 psi in 1st 15 min. Lost 0 psi in 2nd 15 min. Total loss of 0 psi in 30 min. Pass Bleed all pressures to 0 psi. FWP=O/0/0 • • BP EXPLORATION Page 1 of 8 Operations Summary Report Legal Well Name: F-48 Common Well Name: F-48 ~ Spud Date: 7/11/1991 Event Name: WORKOVER Start: 10/7/2007 End: 10/22/2007 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10122/2007 Rig Name: NABORS 4ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 10/7/2007 18:00 - 21:00 3.00 RIGD P PRE PJSM. Rig down rig components. Scope down & lay over derrick. 21:00 - 00:00 3.00 MOB P PRE PJSM. Commence moving rig from Milne Pt K pad to GPB F pad. 10/8/2007 00:00 - 18:30 18.50 MOB P PRE PJSM. Continue moving rig components from Milne Pt to GPB K-48. Rig move was 30 miles. Note: waited 2 hrs for Security escort to move out on Spine road. 18:30 - 21:30 3.00 RIGU P PRE Spot Rig Sub over well. Spot in pits & pipe shed. Begin R/U equip. ACCEPTED RIG @ 2100 hrs. 21:30 - 23:00 1.50 RIGU P DECOMP Raise derrick & Scope up. R/U lines to pits. R/U equip. 23:00 - 00:00 1.00 RIGU P DECOMP Con't to R/U lines & tiger tank. Take on 120 degree seawater. 10!9/2007 00:00 - 00:30 0.50 RIGU P DECOMP Con't to RIU lines to tree & tiger tank. Finish taking on 120 degree seawater. 00:30 - 02:00 1.50 PULL P DECOMP P/U lubricator & test to 500 psi. Pull BPV. L/D lubricator & BPV. 02:00 - 02:30 0.50 KILL P DECOMP Hold PJSM & Pre-Spud meeting w/ all hands. Review plan forward & assign tasks to personnel. 02:30 - 06:30 4.00 KILL P DECOMP .Pressure test lines, I 250 psi, HP 3500 psi. Open well. SITP = 20 psi, SIAP = 20 psi. OAP = 100 psi. Bled off pressure to 0 psi. Circulate well 5 1/2 BPM @ 680 psi. Total bbls.pumped = 850. 06:30 - 07:00 0.50 WHSUR P DECOMP PJSM. Test down hole barrier, TxIA CMIT @ 1000 psi / 10 07:00 - 08:00 1.00 WHSUR P DECOMP PJSM. Set two way check, test from above Ccil 3500 psi / 10 minutes /charted, OK. Test from below, 1000 psi / 10 minutes / charted, OK. 08:00 - 09:00 1.00 WHSUR P DECOMP PJSM. Bleed hanger void, N/D tree. 09:00 - 11:00 2.00 BOPSU P DECOMP PJSM. N/U BOPE. 11:00 - 16:00 5.00 BOPSU P DECOMP PJSM. Test BOPE including all valves on choke manifold, surface safety valve and kelly valves as well as pipe rams, blind shears & annular preventor, 250 / 3500 psi, 5 minutes each test, charted. AOGCC state rep Bob Noble waived witnessing the test. Test witnessed by Nabors Tool Pusher & BP well site leader. Rig down test equipment. 16:00 - 18:00 2.00 WHSUR P DECOMP PJSM. Rig up lubricator, test same @ 500 psi, OK. Pull 2 way check, lay down lubricator. 18:00 - 18:30 0.50 WHSUR P DECOMP Held crew change. Performed pre-tour checks. PU land'+ng joint and screwed into hanger. BOLDS. 18:30 - 20:00 1.50 PULL P DECOMP Pulled tubing hanger free with 118k Ib PU. Hoisted hanger to floor with 133k Ib PU. LD tubing hanger; changed elevators. 20:00 - 00:00 4.00 PULL P DECOMP P d LD 4-1/2" com letion spooling dual encapsulated control lines. LD SSSV and RD control line spooling unit. Recovered 3 stainless steel bands and 32 control line clamps. Added calculated fillup of seawater to well; fluid level steady. 68 jts LD @ 00:00 hrs. 10/10/2007 00:00 - 06:00 6.00 PULL P DECOMP Continued POH and LD 4-1/2" completion. Added calculated fillup of seawater to well; fluid level continued steady. 255 jts LD @ 05:30 hrs. 06:00 - 06:30 0.50 PULL P DECOMP Crews changed. Pre-tower checks. 06:30 - 08:30 2.00 PULL P DECOMP Continue POH and LD with 4 1/2" completion. Total = 307 JTS. 5 GLM. 1 XN nipple. 1 SSSV. Fluid level remained stable. Jet cut is clean and flared from 3 1/2" to 5" OD. Took pictures. Printed: 11/12/2007 4:55:27 PM • • BP EXPLORATION Page 2 of 8 Operations Summary Report Legal Well Name: F-48 Common Well Name: F-48 Spud Date: 7/11/1991 Event Name: WORKOVER Start: 10/7/2007 End: 10/22/2007 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10/22/2007 Rig Name: NABORS 4ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 10/10/2007 08:30 - 10:00 1.50 PULL P DECOMP R/D 4 1/2" TBG power tongs and LD equipment. Clean Rig floor. Install wear bushing. 10:00 - 11:30 1.50 FISH P DECOMP R/U new fall arrest in derrick. 11:30 - 12:30 1.00 FISH P DECOMP PU-MU BHA #1. Torque BHA thread connections to 5700#. 12:30 - 14:00 1.50 FISH P DECOMP Finish loading 125 JTS of 3 1/2" DP in shed and (9) 6 1/4" drill collars. 14:00 - 16:00 2.00 FISH P DECOMP RIH with BHA #1. 16:00 - 17:30 1.50 FISH P DECOMP Slip & Cut 84' of drilling line. 17:30 - 18:00 0.50 FISH P DECOMP Continued RIH with BHA #1 on 3-1/2" DP. 18:00 - 00:00 6.00 FISH P DECOMP Held crew change. Performed pre-tour checks. Continued RIH with 3-1/2" DP. 10/11/2007 00:00 - 00:30 0.50 FISH P DECOMP Continued RIH with 3-1/2" DP. 00:30 - 01:00 0.50 FISH P DECOMP Tagged tubing stub @ 12,161' DPM. PU kelly. PU 205k Ib, SO 106k Ib. Could not rotate. 01:00 - 03:00 2.00 FISH P DECOMP Mixed one drum lubricant in 40 bbls seawater. Spotted tube, circulated seawater around @ 5-6 bpm. 03:00 - 04:30 1.50 FISH P DECOMP Worked pipe 185k Ib up, 115k Ib down. Continued circ @ 6 bpm, 1500 psi. Attempted to rotate; rot wt 145k Ib, 40 rpm and stalling, 280 amps, 9500 Ib-ft. Could not rotate to tubing stub. 04:30 - 06:30 2.00 FISH P DECOMP Mixed 2nd drum lubricant in 40 bbls seawater. Circulated tube around @ 6 bpm. Free rotation parameters stayed the same. 06:30 - 07:00 0.50 FISH P DECOMP Tagged stump Ca)_ 12,161' DPM. Began @ 60 rpm w/ 280 amp - 345 amps, or 9000 - 12,000 ft/Ibs of off bottom torque. Milled down to 12,168' with mill shoe, milled with inner mill @ 12,161'. Made approximately 1" down on stump. Pulled off stump and stopped rotation. Slid over stump several times, no weight gain or loss while passing over stump. 07:00 - 10:45 3.75 FISH P DECOMP Circulated 40 BBL hi-vis sweep. CBU with sea water. 10:45 - 14:30 3.75 FISH P DECOMP POH with BHA #1. 14:30 - 15:30 1.00 FISH P DECOMP Stand back 6 1/4" drill collars. B/D L/D BHA #1. Mill in good shape. Recovered 1 gallon of scale and sand. Recovered 1/2 of control line band. 15:30 - 16:00 0.50 FISH P DECOMP Clean & clear rig floor. 16:00 - 16:30 0.50 EVAL P DECOMP Pre-job with E-line crew. 16:30 - 00:00 7.50 EVAL P DECOMP RU E-line for USIT logging. RIH, USIT logged up from 12,162' in cement and corrosion mode. 10/12/2007 00:00 - 08:30 8.50 EVAL P DECOMP Continued USIT logging from 12,162'. 08:30 - 09:30 1.00 EVAL P DECOMP PJSM. R/D E-line. Clean & clear rig floor. 09:30 - 10:00 0.50 FISH P DECOMP PJSM. P/U M/U running tool & 9 518" RBP. 10:00 - 11:00 1.00 FISH P DECOMP RIH w/ 9 5/8" RBP on 3 1/2" DP. 11:00 - 11:30 0.50 FISH P DECOMP Set 9 5/8" RBP (cD 2411' DPM (18' out on joint 78). PU weight 45K, SO weight 45K. Set down on RBP 15K and pull tested 5K over PU weight to confirm set. 11:30 - 12:00 0.50 FISH P DECOMP PJSM. Stand back 2 stands of DP. R/U sand hopper on OP. 12:00 - 13:00 1.00 FISH P DECOMP Pour 44 sacks of 20x40 river sand (2200#). 13:00 - 14:00 1.00 FISH P DECOMP Displace DP with 1 full volume (225 strokes). Allow sand to fall. 14:00 - 14:30 0.50 FISH P DECOMP Pressure test RBP to 1000 si -charted 15 min test (16 strokes to achieve test pressure). 14:30 - 15:00 0.50 FISH P DECOMP PJSM. RIH & tapped sand @ 2358' DPM. 15:00 - 17:30 2.50 FISH P DECOMP Displaced well to 9.8 ppg brine. 17:30 - 18:30 1.00 FISH P DECOMP TOH with 3-1/2" DP. LD RBP running tool. 18:30 - 20:00 1.50 FISH P DECOMP MU 9-5/8" casing cutting ass'y (BHA #2). Printed: 11/12/2007 4:55:27 PM C • BP EXPLORATION Page 3 of 8 Operations Summary Report Legal Well Name: F-48 Common Well Name: F-48 Spud Date: 7/11/1991 Event Name: WORKOVER Start: 10/7/2007 End: 10/22/2007 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10/22/2007 Rig Name: NABORS 4ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 10/12/2007 20:00 - 21:30 1.50 FISH P DECOMP TIH with BHA #2, 15 stands + 2 singles. 21:30 - 22:00 0.50 FISH P DECOMP PU kelly. Circ 4 bpm @ 500 psi to extend knives. Located casing collar @ 1777'. Free parameters: PU 52k Ib, SO 52k Ib, Rot 52k Ib, 60 amps, 1000 Ib-ft, 30 rpm. PU 27' placing cutter @ 1750'. 22:00 - 23:30 1.50 FISH P DECOMP Cut 9-5/8" casin 1750'. Initial parameters: 5 bpm, 650 psi, 100 amps, 2000 Ib-ft. Torque increased to 300 amps, 10,000 Ib-ft, pumping 6 bpm, 750 psi, Rotary stalled, OA pressure increased from 0 to 260 psi. PU, re-entered cut, continued rotating in cut. 23:30 - 00:00 0.50 FISH P DECOMP Established circulation in OA 4 bpm @ 430 psi with 30 bbls 9.8 ppg brine. 10/13/2007 00:00 - 01:30 1.50 FISH P DECOMP Spotted 50 bbls hot diesel in OA and soaked for 30 minutes. 01:30 - 03:00 1.50 FISH P DECOMP Circ until returns were clean with 9.8 ppg brine 3-6 bpm @ 370-890 psi. Recovered crude oil, solids, diesel and brine from OA. 03:00 - 04:30 1.50 FISH P DECOMP Held PJSM. RD lines, stood back kelly. TOH with BHA #2. 04:30 - 06:00 1.50 FISH P DECOMP LD BHA #2. Knives on cutter indicated good sign of cut. Cleared and cleaned rig floor. ' 06:00 - 06:30 0.50 FISH P DECOMP PJSM. Crews changed. Pre-tower checks. 06:30 - 07:15 0.75 FISH P DECOMP P/U pulling tool & joint for wear bushing. Pump down stack below casing hanger. Bring false bowl & power tongs to rig floor. 07:15 - 07:45 0.50 FISH P DECOMP PJSM. FMC hand BOLDS. Pull wear bushing. LD running tool and landing joint. 07:45 - 08:15 0.50 FISH P DECOMP M/U BHA #3 (casing spear). FMC BOLDS on casing hanger. 08:15 - 09:00 0.75 FISH P DECOMP PJSM. Engage casing hanger @ 22' in on landing joint. Hanger pulled free @ 115K, pulled up 2' and P/U weight fell to 87K. Connect 2" hose to TIW valve & line up flow path. 09:00 - 10:00 1.00 FISH P DECOMP CBU warm 9.8 ppg brine. 4170 total strokes. Approximately 1 BBL of scale in returns. 10:00 - 10:30 0.50 FISH P DECOMP Pull hanger to floor with 87K including 12K blocks. Disengage Spear. LD BHA #3. 10:30 - 11:00 0.50 FISH P DECOMP PJSM. Break out & LD Casing hanger (all hanger seal elements recovered). C/O elevators. 11:00 - 15:00 4.00 FISH P DECOMP POH with 9 5/8" casina. Break out torque - 28,000 ft/Ibs on connections. Pulled 44 joints & 10.74' of cut joint. Recovered 10 turbo clamps. Casing in good overall condition. 15:00 - 15:15 0.25 FISH P DECOMP Cut missing piece approximately 3x4" on side wall. Face of cut has hanging band from wall of casing that lost considerable thickness. Picture in S-drive. 15:15 - 16:15 1.00 FISH P DECOMP Clean & clear rig floor in preparation for running DP. 16:15 - 18:00 1.75 FISH P TIEB1 PUMU dress-off ass'y (BHA #4). 18:00 - 19:00 1.00 FISH P TIE61 Held crew change and performed pre-tour checks. Continued PU BHA #4. 19:00 - 20:00 1.00 FISH P TIE61 TIH with BHA #4. 20:00 - 22:00 .2.00 F{SH P TIEB1 Tagged casing stub ~ 1749'. Established parameters: PU 55k Ib, SO 55k Ib, Rot 55k Ib, 90 amps, 60 rpm, 6 bpm, 440 psi. Dressed csq stub to 1751'. 22:00 - 23:30 1.50 FISH P TIEB1 Circ 40 bbl High-Vis sweep. 23:30 - 00:00 0.50 FISH P TIEB1 TOH with BHA #4. 10/14/2007 00:00 - 01:30 1.50 FISH P TIEB1 LD BHA #4. Recovered approx. 5 gal metal and scale. Mill had indications of casing wear. Printed: 11/12/2007 4:55:27 PM • • BP EXPLORATION Page 4 of 8 Operations Summary Report Legal Well Name: F-48 Common Well Name: F-48 Spud Date: 7/11/1991 Event Name: WORKOVER Start: 10/7/2007 End: 10/22/2007 Contractor Name: NABORS ALASKA DRI LLING I Rig Release: 10/22/2007 Rig Name: NABORS 4ES Rig Number: Date. From - To Hours Task Code NPT Phase Description of Operations 10/14/2007 01:30 - 03:30 2.00 CASE P TIEB1 Clean & clear rig floor. R/U to run 9 5/8" tie-back. 03:30 - 04:00 0.50 CASE P TIEB1 PJSM. 04:00 - 13:00 9.00 CASE P TIE61 P!U casing patch w/ ES cementer. RIH with 9 5/8" casing 13:00 - 14:00 I 1.00 I CASE I P 14:00 - 15:00 1.00 CASE P 15:00 - 15:45 0.75 CEMT P 15:45 - 16c45 ~ 1.00 I CEMT I P 16:45 - 18:00 I 1.251 CEMT I P 18:00 - 19:00 1.00 CEMT P 19:00 - 20:30 1.50 CEMT P 20:30 - 21:30 1.001 CEMT P 21:30 - 00:00 2.50 CEMT P 10/15/2007 100:00 - 00:30 I 0.501 CEMT I P 00:30 - 01:30 1.00 CEMT P 01:30 - 02:30 1.00 CEMT P 02:30 - 04:00 1.50 CEMT P 04:00 - 04:30 0.50 CEMT P 04:30 - 07:15 2.75 CEMT P 07:15 - 08:00 0.75 CEMT P 08:00 - 10:00 2.00 FISH P 10:00 - 11:00 I 1.00 I FISH I N I SFAL 11:00 - 12:30 1.501 FISH N SFAL 12:30 - 13:30 1.00 FISH N SFAL 13:30 - 14:30 1.00 FISH N SFAL 14:30 - 15:00 0.50 FISH N SFAL tie-back with one free-floating centralizer every joint. Ran 43 joints (no rejects) and 41 centralizers. Fi11ed casing with brine every 5 stands. TIE61 Land casing patch @ 1743' (10.5' out on joint #43). PU weight 83K - SO weight 77k before set. Eased on to stub to 15K down to 20K below string weight. Pull tested to 250K. SO to 100K and set slips. TIEB1 Clean & clear rig. Filled remaining casing with brine. TIE61 PJSM with Halliburton. PUMU cementer XO & cementer head. Load plug and line up flow path. TIEB1 PJSM. Pressure test casing to 2000 psi -charted for 30 min. Shear out ES cementer @ 3300 psi, establish circulation 3 BPM @ 70 psi. Pull test casing to 200K to ensure no change after shear out. TIEB1 PJSM. R/D hoses from cementer head. Drained and split stack. TIE61 Held crew change and performed pre-tour checks. PU 100k Ib over string weight. Installed and SO to set slips. TIE61 NU stack. Body tested to 500 psi. Notified AOGCC of upcoming weekly ROPE test, to be done after cutting casing. TIE61 Circulated 4 bpm, 300 psi, warm well to 80 deg F. TIEB1 PJSM. RU cementin a ui ment. Tested lines to 4000 psi. Mixed and pumped 125 bbls CI G cement plus additives @ 5 bpm. Cementing unit displaced cement with 9.8 ppg brine @ 5 bpm. Held back pressure with choke. Slowed displacement rate to 2 bpm and bumped plug 3 bbls beyond calculated displacement. Had about 15 bbls cement returns at surface. TIEB1 Pressured up to 2500 psi to close ES cementer. Released pressure, had no flow back. TIEB1 RD cementing service, cement head and Irnes. TIEB1 ND BOPE. TIEB1 RU Wachs cutter. Cut 33.2' length of casing. LD cut piece. TIEB1 installed 9-5/8" packoff. Filled void. TIE61 PJSM. NU BOPE. TIE61 Tested casing pack-off to 3800 psi for 30 min -PASSED. TIE61 P/U test test plug & running tool. P/U test joint. Prepare for weekly BOPE pressure test. TIE61 Land test plug. Unable to achieve intetgrity on test plug. Attempt to tighten lock down screws. Lock down screws abnormaly resistent to tightening. AOGCC Jeff Jones on location. TIE61 Pull plug and inspect -slight tear on lower lip of seal. FMC changeout 4 lock down screws -put new plug in shed. TIEB1 Set new test plug. Test plug leaking by thru annulus. Pull test plug. Similar tear on lower lip of seal. AOGCC rep off location, will return. TIEB1 Set 4 1/2" tubing hanger with TWC in profile. Unable to test, leaking by thru annulus. P/U landing joint & TIW valve. TIE61 Test TWC. Leaking by TWC -confirmed with flow checks. Pull TWC. Printed: 11/12/2007 4:55:27 PM • • BP EXPLORATION- Page 5 of 8 Operations Summary Report Legal Well Name: F-48 Common Well Name: F-48 Spud Date: 7/11/1991 Event Name: WORKOVER Start: 10/7/2007 End: 10/22/2007 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10/22/2007 Rig Name: NABORS 4ES Rig Number: Date From - To Hours Task Code. NPT Phase Description of Operations 10/15/2007 15:00 - 15:45 0.75 FISH N SFAL TIEB1 Test new TWC -PASSED. LD landing joint & TIW valve. 15:45 - 18:00 2.25 FISH N SFAL TIE61 Test tubing hanger with TWC -able to achieve stable pressure. Call AOGCC back to rig. Prep for BOPE test. 18:00 - 00:00 6.00 FISH P TIE81 Held crew change. Performed pre-tour checks. RU pressure recorder in cellar. No fluid leaking from IA. Successfully tested BOPE to 250 osi low / 3500 psi high. Tests witnessed by J. Jones, AOGCC. 10/16/2007 00:00 - 01:30 1.50 FISH P TIE61 Continued testing BOPE to 250 psi low / 3500 psi high. RD lines and test equipment. 01:30 - 02:30 1.00 FISH P TIE61 PU landing joint. BOLDS. Pulled and LD tubing hanger. 02:30 - 04:00 1.50 FISH P TIE61 PJSM. PUMU drill-out ass'y (BHA #5). 04:00 - 05:00 1.00 FISH P TIEB1 TIH with BHA #5. Tagged cement @ 1704' DPM. Pre-drill parameters = PU weight 54K, SO weight 53K. Rotate - 2000 fUlbs @ 80 rpm. Pump rate - 5 BPM @ 180 psi. 05:00 - 09:00 4.00 DRILL P TIEB1 Drilled cement. WOB from 1 K - 10K. Rotate - 2000 ft/Ibs @ 80 rpm. Pump rate - 5 BPM @ 180-200 psi. Drilled down thru shoe @ 1751' DPM -pumped 20 BBL hi-vis sweep. Make several passes thru shoe track. CBU, recovered rubber, metal & cement. 18,083 total strokes pumped. 09:00 - 10:00 1.00 DRILL P TIEB1 Kelly down. RIH -tag T.O.S @ 2342' DPM (appears to be 16' higher than expected). 10:00 - 10:45 0.75 DRILL P TIE61 Kelly up. Spud into sand 5 times with 20K WOB. Rotate down 5' to 2347' DPM. Parameters = 3000 ft/Ibs @ 60 rpm with pump rate @ 1.5 BPM - 50 psi. CBU 20 BBL sweep and chase with 9.8 brine. 10:45 - 11:15 0.50 FISH P TIEB1 PJSM. Prep lines and hook up chart for casing pressure test. 11:15 - 12:30 1.25 FISH P TIE61 Pressure test casing to 3500 psi -charted for 30 min. Bleed down lines. RD test equipment. 12:30 - 14:00 1.50 FISH P TIEB1 Pump 20 BBL hi-vis spacer. Displace 9.8 brine to 8.5 ppg 1% KCL. 14:00 - 15:30 1.50 FISH P TIE61 PJSM. POOH with BHA #5. 15:30 - 16:15 0.75 FISH P TIEB1 PJSM. BDLD BHA #5 -bit, junk baskets & bit sub. Revovered cement & large pieces of aluminum and brass. 16:15 - 16:45 0.50 FISH P TIE61 PJSM. PUMU BHA #6. 7-5/8" RCJB, 2 -boot baskets, 9 5/8" scraper, bit sub, bumper sub, oil jars, XO, 9 - 6 1/4" Drill collars, XO. OAL = 318.52'. 16:45 - 17:15 0.50 FISH P TIE61 Blowout drill, Post-drll evaluation & lessons learned. 17:15 - 18:00 0.75 FISH P TIEB1 PJSM. RIH with BHA #6. 18:00 - 19:30 1.50 FISH P TIEB1 Held crew change. Performed pre-tour checks. Continued TIH with BHA #6. 19:30 - 20:00 0.50 FISH P TIEB1 Tagged sand @ 2345' DPM. PU kelly and established parameters: PU 62k Ib, SO 60k Ib, Rot 61 k Ib. Pumped 5 bpm @ 1330 psi, 60 rpm, 1500 Ib-ft. Rotated and washed to 2359'. 20:00 - 21:00 1.00 FISH P TIEB1 CBU. 21:00 - 00:00 3.00 FISH P TIE61 TOH with BHA #6. LD scraper and cleared boot baskets. Recovered aluminum ring pieces, plastic cone and about 1 gal cement. 10/17/2007 00:00 - 01:00 1.00 FISH P TIE61 TIH with RCJB clean-out ass'y less casing scraper (BHA #7). 01:00 - 01:45 0.75 FISH P TIEB1 PU kelly. PU 62k Ib, SO 60k Ib, Rot 61k Ib. 60 rpm, 1500 Ib-ft, 5 bpm, 1280 psi. Rotated and washed 2359' - 2390'. 01:45 - 03:00 1.25 FISH P TIE61 Pumped 20 bbl High Vis sweep and circ around. 03:00 - 04:30 1.50 FISH P TIEB1 TOH with BHA #7. 04:30 - 05:30 1.00 FISH P TIEB1 Cleared boot baskets; recovered 1-2 gal metal pieces and Printed: 11/12/2007 4:55:27 PM ~i • $P `EXPLORATION Page 6 of 8 Operations Summary Report Legal Well Name: F-48 Common Well Name: F-48 Event Name: WORKOVER Contractor Name: NABORS ALASKA DRILLING I Rig Name: NABORS 4ES Date I From - To I Hours ~ Task (Code l NPT 10/17/2007 04:30 - 05:30 1.00 FISH P 05:30 - 06:00 0.50 FISH P 06:00 - 06:45 0.75 FISH P 06:45 - 08:15 1.50 FISH P 08:15 - 09:45 I 1.501 FISH I P 09:45 - 11:30 I 1.75 FISH I P 11:30 - 12:30 1.00 FISH P 12:30 - 13:00 0.50 FISH P 13:00 - 14:15 1.25 FISH P 14:15 - 15:30 I 1.251 FISH I P 15:30 - 18:00 I 2.501 FISH I P 18:00 - 18:30 0.50 FISH P 18:30 - 20:00 1.50 FISH P 20:00 - 21:00 1.00 FISH P Start: 10/7/2007 Rig Release: 10/22/2007 Rig Number: Phase TIEB1 TIE61 TIE81 TIEB1 TIEB1 TIEB1 TIEB1 TIEB1 TIEB1 TIEB1 TIEB1 TIEB1 TIE61 TIE61 21:00 - 21:30 0.50 FISH P TIEB1 21:30 - 23:00 1.50 FISH P TIE61 23:00 - 23:30 0.50 FISH P TIEB1 23:30 - 00:00 0.50 FISH P TIE61 10/18/2007 00:00 - 02;00 2.00 FISH P TIEB1 02:00 - 05:45 3.75 FISH P TIEB1 06:15 -106:30 5.25 FISH I P TIEB1 11:30 - 12:30 I 1.001 FISH I P I ITIE61 12:30 - 18:00 5.501 FISH I P I ITIEB1 18:00 - 18:30 I 0.501 FISH I P I ITIEB1 Spud Date: 7/11 /1991 End: 10/22/2007 Description of Operations shavings, cement chunks and rubber. PJSM. MU RCJB clean-out ass'y (BHA# 8). Crews changed. Pre-tower checks. RIH with BHA #8. 7 5/8" RCJB, 2-boot baskets, bit sub, bumber sub, oil jars, XO, 9 - 6 1!4" drill collars & XO. OAL = 314.13'. Tag TOS @ 2390' DPM. Wash down to 2400' while rotating. PU weight - 65K, SO weight - 60K. Pump rate = 6 bpm @ 1600 psi. Rotate = 40 rpm @ 1000 ft/Ibs. Circulate 20 BBL sweep, CBU. PJSM. Kelly down. POOH with BHA #8. PJSM. BD BHA #8. Recovered 1/2 of turbo clamp from original 9 5/8" casing. Recovered 2+ gallons of sand with metal shavings. Clean out scale from RCJB jets. MU BHA #9. PJSM. RIH with BHA #9. 7 5/8" RCJB, 2-boot baskets, bit sub, bumper sub, oil jars, XO, 9 - 6 1/4" drill collars, XO & pump out sub. OAL = 315.81'. Kelly up. Run parameters: 6 bpm @ 1700 psi, PU = 65K, SO = 60K. Tag @ 2400' DPM, set 2K on bit. Begin pumping @ 6 bpm @ 1850 psi & wash down over fish neck to 2411'. P/U 5' and rotate down 15 rpm @ 1500 fUlb, stop rotating and set down on top of plug 5K. Swallow fish neck several times with out rotating while circulating - no restrictions noticed. Pump 40 BBL sweep -CBU until clean returns. Circulated out sand, rubber and metal shavings. Total strokes pumped = 6163. Kelly down. POOH with BHA #9. Cleared boot baskets. Recovered about 2 gal metal debris, cement, and remaining turbo clamp piece. LD RCJB ass'y. Held crew change. Performed pre-tour checks. Reverse circulated 3 bpm. Engaged RBP @ 2411'. Released CBU and monitored well. TOH and LD RBP and retrieving tool. Cleared and cleaned rig floor. MU 3-5l8" mill and motor ass'y (BHA #10). Continued MU 3-5/8" mill and motor ass'y (BHA #10). TIH with BHA #10. Filled DP each 5 stands. Circulated 2 bpm through motor each 2000' on TIH. Crews changed. Pre-tower checks. Continue to RIH with BHA #10 with same circulating parameters. Stab head pin & break circulation - 2 1/2 BPM @ 450 psi. PU weight 168K, SO weight 121 K. Rotate down @ 5 rpm - 7000 ftllbs and swallow tubing stub @ 12,161' DPM. Shear guide shoe, make several passes thru shoe. EP mud tube in returns. RIH & tag plug @ 12,204'. PU weight 164K, SO weight 118K. Pumping parameters 2 112 BPM @ 560 psi. Set down lightly while circulating -pump will spike to 750 psi and stall out. Shut down pump - P/U string and repeat drilling operations under consistant controls. Acting like junk build up on Fasdrill plug. Held crew change and performed pre-tour checks. Continued Printed: 11/12/2007 4:55:27 PM • • BP EXPLORATION Page 7 of 8 Operations Summary Report Legal Well Name: F-48 Common Well Name: F-48 Spud Date: 7/11/1991 Event Name: WORKOVER Start: 10/7/2007 End: 10/22/2007 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10/22/2007 Rig Name: NABORS 4ES Rig Number: Date I From -.To I Hours Task I Code I NPT Phase I Description of Operations 10/18/2007 I ~ 8.30 - 20:00 10.50 FISH P TIEB1 20:00 - 21:30 I 1.501 FISH I P I I TIEB1 21:30 - 00:00 2.50 FISH P TIE61 10/19/2007 00:00 - 04:00 4.00 FISH P TIE61 04:00 - 06:00 2.00 FISH P TIEB1 06:00 - 06:30 0.50 FISH P TIEB1 06:30 - 07:00 0.50 FISH P TIE61 07:00 - 07:45 0.75 FISH P TIE61 07:45 - 10:30 2.75 FISH P TIEB1 10:30 - 11:30 1.00 FISH P TIE61 11:30 - 16:00 4.50 FISH P TIE61 16:00 - 18:00 2.00 FISH P TIE81 18:00 - 19:00 I 1.001 FISH I P I ITIEB1 19:00 - 19:30 I 0.501 FISH P TIEB1 19:30 - 20:00 0.50 FISH P TIE61 20:00 - 00:00 4.00 FISH P TIE61 10/20/2007 00:00 - 05:00 5.00 FISH P TIEB1 05:00 - 06:00 1.00 FISH P TIEB1 06:00 - 06:30 0.50 FISH P TIEB1 06:30 - 07:00 0.50 FISH P TIE61 07:00 - 13:00 6.00 RUNCO RUNCMP 13:00 - 18:00 I 5.001 RUNCOIWP I I RUNCMP 18:00 - 00;00 I 6.001 RUNCON'P I I RUNCMP 10/21/2007 100:00 - 06:00 I 6.001 RUNCOPYTP I I RUNCMP 06:00 - 06:30 I 0.501 RUNCON'P I I RUNCMP Attempted to PU above 4-1/2" tubing. Had 57k Ib overpull and indications of junk dragging between the BHA and 9-5/8" casing. Worked and jarred several times before free upward movement. Spotted 40 bbls lubricant slug around BHA. Pumped 2-1/2 bpm, 600 psi. Placed lubricant slug approximately 2000' off bottom in annulus. Reciprocated two joints while circulating. POH with mill / motor ass'y. PU with 5k-6k Ib overpull. Continued POH with BHA #10. LD mud motor and wash pipe. PJSM. Crews changed. Pre-tower checks. Continue LD BHA #10. Recovered 1/2 gallon of sludge with small amounts of cuttings MU BHA #11. RIH with BHA #11. 3 5/8"junk mill, shear sub (8 1/2" shoe, bushing, shear thru bushing), 5 jts PAC pipe, XO, pump out sub, double pin sub, 2-boot baskets, bit sub, bumper sub, jars, XO, 9 - 6 1/4" drill collars, XO. OAL = 468.32 PJSM. Slip & cut 84' drilling line. Continue RIH with BHA #11. Parameters in 9 5/8" = PU weight 168K, SO weight 125K. 144K rotating weight, 60 rpm @ 7000 fUlbs. Ease over tubing stump with out problems. Establish parameters in 4 1/2" tubing = PU weight 163K, SO weight 119K. 141 K rotating weight, 60 rpm with 3500 ft/Ibs. Tag plug @ 12,198' DPM. Pump several EP mud tube pills while milling. Milled plug, observed well taking fluid. CIH to kelly down @ 12,206' DPM. Held crew change. Performed pre-tour checks. Continued milling tubing plug and debris. Well began taking fluid @ 12,200'. PU stand, pushed debris to 12,275' DPM. Stood back kelly. LD 5 jts to PU above tubing stub. Attempted to fill hole. Added 50 bbls seawater with no returns. POH, LD 3-1/2" drill pipe. Added double pipe displacement volume of seawater. 171 jts LD @ 00:00 hrs. Continued POH, LD DP. Double displaced pipe volume. LD milling ass'y (BHA #11). Crews changed. Pre-tower checks. Clean & clear rig floor. Rig up floor and tubing handling equipment to run 4-1/2" tubing completion. DHD shot sonic fluid level shot and found fluid 1800' from surface. Shot fluid level again 30 minutes later and fluid level had dropped 78' to 1878' from surface. Pumped 50-bbls. fluid into well @ 11:45-hrs. RIH with 4 1/2" 12.6# 13Cr80 completion. Baker lock all connections below 4 1/2" x 9 5/8" S-3 packer. Torque all connections to 4450#. Pump 40 bbls/hr across the hole. Continued running 4-1 /2" 13Cr80 completion. Adding 40 bbls/hr seawater to well. 162 jts in hole @ 00:00 hrs. No rejected joints @ 00:00 hrs. Continued running 4-1/2" 13Cr80 completion, adding 40 bbls/hr seawater. 249 jts in hole @ 05:00 hrs. Crews changed. Pre-tower checks. Printed: 11/12/2007 4:55:27 PM s • BP EXPLORATION Page 8 of 8 Operations Summary Report Legal Well Name: F-48 Common Well Name: F-48 Event Name: WORKOVER Start: 10/7/2007 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10/22/2007 Rig Name: NABORS 4ES Rig Number: Date I From - To (Hours ~ Task I Code I NPT 10/21/2007 06:30 - 08:30 2.00 RU 08:30 - 09:30 1.00 RU 09:30 - 11:30 2.00 RU 11:30 - 16:00 4.50 RU 16:00 - 18:00 2.00 RU 18:00 - 19:30 1.50 RU 19:30 - 20:00 0.50 RU 20:00 - 21:30 21:30 - 23:00 23:00 - 00:00 10/22/2007 00:00 - 00:30 00:30 - 02:30 1.501 RUNCO 1.50 BOPSU P 1.00 WHSUR P 0.50 WHSUR P 2.00 WHSUR P Spud Date: 7/11/1991 End: 10/22/2007 Phase I Description of Operations RUNCMP Continue to RIH with 4 1/2" 13Cr80 completion. RUNCMP 284 joint ran @ 0830. Torqued all connections to 4450#. Ease down over tubing stump. Had to circulate down over stump to clear junk from around tolerance of Unique overshot. Work pipe down to land. RUNCMP PJSM. MU 4 1/2" tubing hanger. Space out hanger with Baker hand. Prior to {anding hanger: PU weight = 127K. SO weight = 92K. Land hanger with FMC hand. RILDS. RU to begin circulating. RUNCMP Pump 185 bbls of heated 8.5 ppg seawater. Pump 470 bbls of inhibited 8.5 ppg seawater @ 3 BPM with -50 psi. Did not have returns. RUNCMP Drop Ball & Rod. Filled tubing and tested to 3500 psi for 30 RUNCMP Held crew change and performed pre-tour checks. Bled tbg pressure to 1500 psi and filled IA. Tested IA to 3500 psi for 30 minutes. RUNCMP Bled tbg pressure to shear DCR. Circulated both ways with returns. RUNCMP Set TWC. Tested from above and below to 1000 psi for 10 minutes. RUNCMP Drained stack, RD choke and ki11 fines. ND BOPE. RUNCMP NU tubing head adapter flange. RUNCMP Tested tubino head adapter flange to 5000 psi. RUNCMP NU tree and tested to 5000 psi. F-Pad Operator confirmed tree orientation. 02:30 - 03:30 1.00 WHSUR P RUNCMP RU lubricator and tested to 500 psi. Puled TWC. 03:30 - 07:00 3.50 RUNCO RUNCMP RU LRS. Freeze protected well to 2200' with 155 bbls diesel. Allow diesel to U-Tube. Bleed off pressure. 07:00 - 08:00 1.00 RUNCO RUNCMP FMC dry rod set BPV. LRS P/T BPV to 1000-psi from below. RDMO LRS. 08:00 - 09:00 1.00 RUNCO RUNCMP Secure cel{ar and Tree. Release rig @ 0900-hrs. Printed: 11/12/2007 4:55:27 PM TR)=.E= 4-1116" CNV WELLHEAD = 13-5/8" FMC ACTUATOR= BAKER KB. ELEV = 64.83' BF. ELEV - 37.13' KOP = 1800' Max Angle = 57 @ 4628' Datum MD = 12504' Datum ND = 8800' SS ~ 9-5/8" CSG, 47# L-80 HY D 563, ID = 9.875" ( 13-3/8" CSG, 68#, NT-80 BUTT, ID = 12.415" ~-~ Zi Minimum ID = 3.725" @ 12245' 4-1/2" PARKER SWN NIPPLE SAFr=TY NOTES: ***CHROME TBG 8~ LNR*** F ~ ~ THERE IS A HISTORY OF PROBLEMS RETRIEVING TOOLS THROUGH THE TAILPIPE DEFORMITY! OBSTRUCTIONS IDENTIFlED ON BHTV SURVEY 08/02/92 1732' 9-5/8" HES ES CEMENTER 2057' 4-1 i2" HES X N1P, ID = 3.813 GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3126 2976 41 MMG DOME RK 0 11/13/07 4 6122 4772 52 MMG SO RK 0 11!13/07 3 8144 5968 53 MMG DMY RK 0 10121 /07 2 9721 6967 49 MMG OMY RK 0 10/21/07 1 11092 7915 48 MMG DMY RK 0 10/21/07 12045' 4-1/2" HES X NIP, ID = 3.813" 1.0Z6~J-19-5/8" X4-1 /2" S-3 PKR, ID = 3.870" 12090' 4-112" HES X NIP, ID = 3.813" 4-1/2" TBG, 12.6#, 13CR-80 VAM TOP, .0152 bpf, ID = 3.958" 4-1/2" TBG STUB (10/11/07 TOP OF 7" LNR 4-1/2" TBG, 12.6#, NT13CR, 0152 bpf, ID = 3.958" 9-5/8" CSG, 47#, NT-80S NSCC, ID = 8.681" PERFORATION SUMMARY REF LOG: HLS BHCS ON 07/29/91 ANGLE AT TOP PERF: 48° @ 12480' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-5/8" 6 12480 - 12510 O 03/19/92 3-3/8" 6 12653 - 12678 O 09/27191 PBTD 7" LNR, 26#, 13CR-80, .0383 bpf, ID = 6.276" 12{ 163• I-~ 9-5/8" X4-112" UNIQUE OVERSHOT 12169' RIGHT-HAND RELEASE LATCH 12170' 9-518" X4-1 /2" TM/ HBBP PKR, ID = 3.875" 12195' 9-518" X 7" TIW LNR HGR, ID = ? 4-1/2" PARKER SWS NIP, ID = 3.813" 14-1/2" PARKER SWN NIP, ID = 3.725" I 12257' --j 4-112" WLEG, ID = 3.958" y 12257' ELMD TT LOGGED 09!27/91 DATE REV BY COMMENTS DATE REV BY COMMENTS 08/04!91 N18E ORIGINAL COMPLETION 10122/07 N4ES RWO 11/19!07 JLJ/PJC GLV GO (11/13/07) 11/21/07 RWL/PJC DRLG DRAFT CORRECTIONS PRUDHOE BAY UN(t WELL: F-48 PERMfT' No: 1910860 API No: 50-029-22187-00 SEC 2, T11 N, R13E, 3362' FSL & 2863' FEL BP Exploration (Alaska) ScblumbBPger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 A TTN: Beth Well F-48 G-19A NGI-13 MPE-30A F-11B W-12A 11-27 02-22A 01-16 01-14 L5-05 D-21 14-15 D-18A 14-05A 1-2310-15 S-03 1-09A1L-21 P2-19A OWDW-NW K-01 11-32 3-25BIL-27 Job# 11846815 11890315 11890313 11855817 11649954 11418301 11637127 11216214 11630486 11801086 11767129 11626119 11221550 11695074 11813055 11846802 11223120 11849930 11649963 11211370 11695073 11630498 11630490 5tJ4NNED OC1 312007 ::-::: Loa Description USIT 1'1/-lvt ¡.,..,. USIT /'-1l1 - t~ USIT I ),1" I ¥ -cA. ( USIT ~Ol -0 f MCNL :Ú:J..:/- /¿il../-# I~J -t..') MCNL J '1?f -/')( ~ .. /5:ç~'-f RST ;~ ih - /47í ti: J .....S---:}L MCNL .oN, - (, ,,0, · I S~ ~ RST I "':f1r-Q05r "'1 t:ç":<'-i--'.ii RST .j "J- -¡.. _ r-."J.. "J. 1t ~:'i +'-1 MCNL / "k ":} -('')("c: fit" . ~<:-'S. 0 RST I 'X::J - t,~~ èþ. I ~x , RST 11r I - PI'7I'-( ." ,-SS-x';" RST C)()/- Ih'?J --- IS". '75 RST to,~-('V) ( .. 1~ &, RST ,).,. I' lO¡I..( i-J ~~ 1iJ' 1 ~ "5?í.oÇ RST 1"'~1 -/C¡.,\ 1t :->""1.<-1 RST I t:.~ _ ",qq 11: I SS- ':f:<; MCNL ~')f'{+- Aid .... 1~5"+d RST ¡ J -r " I,." -v I..... $'I. r.SS""9-/ RST 1~3 - I;) I 'Jf' /ð-S-1-O RST 1'74- I~I "'1~S("''9 RST ..::v,Q - ^~ I ... ,~<"7_'V - PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center lR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: \i\\_cf11~ Date 10/12/07 09130/07 09/30/07 10/01/07 03/22107 09/10106 06/05/07 10/02/06 06128/07 07/07/07 06117107 09112(07 03107106 08/28(07 06/11/07 08/11107 06/13/06 08104107 04122/07 02/28/06 08/27/07 09/03/07 07/26/07 10/23107 NO. 4459 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay, Endicott, Aurora, Milne Pt.,LisburnE BL Color 1 1 1 1 CD . 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 . 1 1 1 1 1 1 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 """".go. AX '0503'2"¿ ATTN: Beth £ Received by: Cd F-48 workover Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Thursday, September 27, 2007 11:19 AM To: 'West, Howard J' Subject: RE: F-48 workover Howard, Thanks for the update. I will place a copy of your message in the file Tom Maunder, PE AOGCC • ~~~-o~~ From: West, Howard J [mailto:Howard.West@bp.com] Sent: Thursday, September 27, 2007 9:32 AM To: Maunder, Thomas E (DOA) Subject: F-48 workover ~~~ JAN ~ 200 Tom, Page 1 of 1 I just wanted to let you know what the course of action will be regarding F-48 RWO (sundry # 3Q,Z-,3:81). First off, Nabors 4ES ,not 2ES, will be moving on to this well within the next two vresks. Second, the planned course of action at this point will be to puN existing 4 1/2" comple#ion, cut and pull the 9 518" above logged top of cement, run new 9 5/8 and cement to surface, before running new 4 1/2" completion. This scenario was mentioned in the approved sundry, but i thought you may want to know which of the possibilities we were planning on panning with. Thanks for your time and let me know if you have any questions /comments, Howard West RWO ENGINEER 564-5471 (o) 230-6628 (c) 9/27/2007 . 1r1rŒ [ill ~ ~~~~L\{~ . AIµ\.SIiA. OIL AlQ) GAS CONSERVATION COMMISSION I SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Greg Hobbs Drilling Engineer BP Exploration (Alaska) Inc PO Box 196612 Anchorage, AK 99519-6612 \qlrOs{, Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU F -48 Sundry Number: 307-181 SCANNED JUN Ð 7 20D7 Dear Mr. Hobbs: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed fOnTI. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, DATED this ~ day of June, 2007 Enc!. . omml 1. Type of Request: 0 Abandon o Suspend o Operation Shutdown o Perforate o Time Extension Anchorage o Alter Casing ~ Repair Well o Plug Perforations o Stimulate o Re-Enter Suspended Well o Change Approved Program ~ Pull Tubing o Perforate New Pool o Waiver o Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ~ Development D Exploratory 191-086 ~ 3. Address: o Service D Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22187 -00-00 ~ 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU F-48 _ Spacing Exception Required? DYes ~No 9. Property Designation: 110. KB Elevation (ft): 11. Field 1 Pool(s): ADL 028278 64.83' Prudhoe Bay Field 1 Prudhoe Bay Pool - 12; ....: WELL ~. ... ~. :... :../.: ..... ..: /:' 'f 'if . 'IUN ... . Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 13175 / 9307 F 13097 9256 12158 None Casinn Lennth Size MD TVD Burst CollaDse Structural Conductor Surface 2755' 13-3/8" 2755' 2678' 5020 2270 Intermediate 12461' 9-5/8" 12461' 8836' 6870 4760 Production Liner 980' 7" 12195' -13175' 8655' - 9307' 7240 5410 Perforation Depth MD (ft): I Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: Tubing MD (ft): 12480' - 12678' 8849' - 8981' 4-112", 12.6# 13Cr 12257' Packers and SSSV Type: 9-5/8" TIW 'HBBP' packer I Packers and SSSV MD (ft): 12170' 13. Attachments: 14. Well Class after proposed work: ~ Description Summary of Proposal D BOP Sketch D Exploratory ~ Development D Service D Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: CommencinQ Operations: August 12, 2007 ~ Oil DGas D Plugged D Abandoned 17. Verbal Approval: Date: DWAG DGINJ DWINJ D WDSPL Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact John Rose, 564-5271 Printed Name Greg Ho¡Ws Title Senior Drilling Engineer f1 5'b~1 Prepared By Name/Number: Signature Phone 564-4191 Date Terrie Hubble, 564-4628 Commission Use Only Conditions of approval: Notify Commission so that a representative may witness I Sundry Number: c.2£) 7 ' / K ( D Plug Integrity ~OP Test D Mechanical Integrity Test D Location Clearance Other: ~SCù\>c.,\ ~O\'-\-<t.>.-\. ~,,\:.\\-~ c.c"--\'V\.~":>~~~..\- \~ ~~\""~')<.o~~ ~~'""'- '\\,~ <VCè-\<e- ,~~ Ð . Subsequent Form Required: '-\\J~ (ZJ ~~I APPROVED BY 6 ~f r() r- ADDroved Bv: -¡-. Á' I J~ '.cð"MMI ER THE COMMISSION Date Form 10-403 Revised 06/2006 - I"'~ "- Submit In Du licate ()~ '/.t:/7 .c:p;¡ b'b~~:TEOFALASKA _ ~ RECEIVED ALASKAOILANDGASCONSERVATIONCOM~ION ~/Ç MAY 312007 APPLICATION FOR SUNDRY APPROVAL AI t 20 AAC 25 280 . aSK! Oil & Gas Cons C . sion ORIGINAL RBDMS 8Fl ,IUN 0 7 2007 iDOl L 0 Nfl/' 1::1S StI.Bj p . . To: Tom Maunder, Petroleum Engineer Alaska Oil & Gas Conservation Commission From: John Rose, ODE Date: May 21,2007 Re: PBU F-48 RWO (Application for Sundry Approval) Scope of Work: This primary focus of this workover is to eliminate the 1A x OA communication problem that currently exists with this well. The planned ''fix'' for this IA x OA communication problem will include one or all of the following RWO activities/procedures: 1. Change-out the IC packoff. 2. The possible replacement of any bad 9-5/8" production casing that can be cut and pulled and re-run to surface. 3. A 7" "scab" liner which may be used to cover/isolate any bad 9-5/8" production casing which is covered with cement and cannot be cut and pulled. After pulling the current 4-1/2" completion, specific leak detection work will be performed on the well which will then dictate the path-forward well work that will be required. Please note the following outline as provided below for more specific details regarding the workover plans for this well. MASP: 2275 psi Well Type: Ivishak Producer Estimated Start Date: August 12, 2007 F-48 RWO Planned Operations Summary (05/18/07) Pre-Ria 01 erations: (Work needs to be done within a 45 days 2ES movina onto well.) 1. S Pull PX plug from X-nipple at 12,158' MD. 2. S Drift well to confirm the current PBTD w/3.833" drift (locate WLEG on drift run). 3. E Set HES FasDrill at -12,203' MD and pressure test to 3500 psi (set in the only full joint of 4-1/2" tubing below the current 4-1/2" HBBP permanent packer at 12,158' MD). (NOTE: There are comments in the Tech package referring to "oval'ed" tailpipe which may complicate the settinÇJ of this pluÇJ.) 4. E Chem cut the 4-1/2" tubing (to insure a "clean" stub looking up) at -12,162' MD (2' into the 10' pup just below the X-nipple profile at 12,158' MD). 5. P Fluid pack well with seawater through the tubing cut at 12,162' MD. 6. E Run 4-1/2" tubing caliper to confirm the condition of the tubing string. 7. E CMIT TxlA to 3500 psi. If test fails, run LDL to confirm "leak" (the leak may be associated with the condition of the IC pack-off). 8. P MIT the OA to 2000 psi. 9. P Freeze protect the IA and tubing with diesel to - 2200' md. 10. PPPOT-T and PPPOT-IC. Function all LOS, repair or replace as necessary. 11. 0 Bleed all pressures to zero. Set BPV. Secure well. 12. 0 Verify that the well house is removed and that the flow lines are disconnected. If necessary, level the pad. Ria Operations: 1. MIRU Nabors 2ES. 2. Pull BPV. Circulate out freeze protection and displace well to SW. 3. Monitor OA, IA and T for pressure. Verify well is dead. 4. Set TWC and pressure test T x IA to 1000 psi to confirm barriers. 5. Nipple down tree. Nipple up and test BOP. Pull TWC. F-48 RWO 1 . . Pull the 4-%" tubing, control lines and control line 6. RU spooling unit for encapsulated control lines. bands from pre-rig cut at -12,162' MD. 7. MU an 8-1/2" clean-out assembly to include a 9-5/8" casing scraper and clean-out the well to top of the tubing stub at 12,162' MD. 8. RU E-line. Make CCUGR/JB and USIT logging runs from tubing stub to surface looking for 9-5/8" casing leaks and to confirm the TOC on the back-side of the casing. (NOTE: TOC on 9-5/8" casing estimated to be just below surface casing shoe at 2755' MD and there is no record of any cement job in the 13-3/8" x 9-5/8" annulus as 161 bbls of crude (total OA annular volume) was pumped into that annulus at wells end.) 9. If it is concluded that the IC pack-off is the only source of the OA x IA communication in this well and that the over-all condition of the existing 9-5/8" casing is considered to be "good", change-out the IC pack-off and proceed to Step #12 of this wellplan to run a stacker-packer completion. 10. If a "leak" or bad 9-5/8" casing is determined to be above the TOC in the 13-3/8" x 9-5/8" annulus, cut and pull the existing 9-5/8" casing from above the TOC and run and fully cement a new tie-back 9-5/8" casing string. With the new 9-5/8" tie-back casing successfully cemented in place, proceed to Step #12 of this wellplan to run a stacker-packer completion. 11. If a "leak" or bad 9-5/8" casing is determined to be below the TOC on the back-side of the 9-5/8" casing, continue the de-completion phase of this RWO by removing the rest of the 4-1/2" completion in the well (this includes the removal of the HBBP packer at 12,170' and tailpipe assembly). With the well de-completion complete, run a 7" "scab" liner from the top of the existing 7" liner tie-back at 12,195' MD to some point up the well to effectively cover the bad 9-5/8" casing (-3000' MD). With the scab liner successfully cemented in place, proceed to Step #13 of this wellplan to run a new 4-1/2" single production packer completion. 12. MU a clean-out BHA and RIH and drill-out the FasDrill plug in the 4-1/2" tubing tail at 12,203' prior to running a new 4-1/2",12.6#,13 Cr80, VamTop stacker-packer completion. 13. Run 4-%",12.6#, 13Cr-80, VamTop conventional single production packer completion. 14. Displace the IA to packer fluid and set the packer. 15. Test tubing and IA to 3500 psi. Freeze protect to 2200' MD. 16. Set BPV. ND BOPE. NU and test tree. RDMO. Post-RiQ Work: 1. Install well house and flow lines. 2. MIRU slickline. Pull the ball and rod / RHC plug from 'X' nipple below the packer. 3. Install GLM valves as required. F-48 RWO 2 .TREE= 4-1/16" 5M CrN . SA~ES: ***CHROME TBG & LNR*** WELLHEAD - 13-5/8" 5M FMC F-48 ACTUA TOR = BAKER THERE IS A HISTORY OF PROBLEMS RETRIEVING TOOLS KB. ELEV = 64.83' THROUGH THE TAILPIPE. DEFORMITY / OBSTRUCTIONS BF. ELEV = 37.13' IDENTIRED ON BHTV SURVEY 08/02/92 KOP= 1800' Max Angle = 57 @ 4628' Datum MD = 12504' Datum lVD = 8800' SS I 2052' -14-1/2" OTIS SSSV NIP, ID = 3.813" I . 113-3/8" CSG. 68#, NT-80, ID= 12.415" I J ~ GAS LIFT MANDRELS 2755' ST MD lVD DEV TYÆ VLV LATCH PORT DATE 5 3142 2936 42 CAMeO DMY RK 0 05/05/06 U 4 7865 5723 55 CAMeO DMY RK 0 05/05/06 3 10477 7401 45 CAMeO DMY RK 0 05/05/06 Minimum ID = 3.725" @ 12245' 2 11827 8315 48 CAMCO DMY RK 0 05/05/06 4-1/2" PARKER SWN NIPPLE 1 12129 8516 48 CAMCO DMY RK 0 05/05/06 12158' -14-1/2" PARKER SWS NIP, ID = 3.813" I r-. N 12158' -14-1/2" PX PLUG (10/11/06) I 1 12169' H RIGHT-HAND RELEASE LA TCH I 8: ¡"......., 12170' -19-5/8" 9-CR-1 MO TrN HBBP PKR, ID = 3.875" I ¡.::::. TOP OF 7" LNR 1 12195' I iI!II I . I 12223' -14-1/2" PARKER SWS NIP, ID = 3.813" I . I I 12245' 1-14-1/2" PARKER SWN NIP, ID = 3.725" I 14-1/2" TBG, 12.6#, 13-CR, .0152 bpf, ID = 3.958" I 12257' 12257' -14-1/2" WLEG I 1 12257' 1-1 ELMD TT LOGGED 09/27/91 1 19-5/8" CSG, 47#, NT-80S NSCC, ID = 8.681" 1 12461' µ ~ ÆRFORA TION SUMMARY REF LOG: HLS BHCS ON 07/29/91 ANGLEATTOPÆRF: 48 @ 12480' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DATE 2-5/8" 6 12480 - 12510 C 03/19/92 3-3/8" 6 12653 - 12678 C 09/27/91 1 PBTDI 13097' 17" LNR, 26#, 13-CR, .0383 bpf, ID = 6.276" 1 13175' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNrr 08/04/91 ORIGINAL COM PLETION WELL: F-48 08/26/01 RN/KAK CORRECTIONS ÆRMrr No: 1910860 09/23/05 EZUPJC WArvER SFTY NOTE DELETED API No: 50-029-22187-00 05/12/06 WTS/PAG GLV C/O (05/05/06) SEC 2, T11 N, R13E, 1914' FNL & 2863' WEL 10/11/06 RCT/TLH PX PLUG SET BP Exploration (Alaska) . TREE = 4-1/16" 5M CrN . F-48 Post Pre-Rig Wor. (Will require dispensation for single barrier on initial ND/NU.) WELLHEA[)o= 13-5/8" 5M FMC ACTUA TOR = BAKER KB. ELEV = 64.83' BF. ELEV = 37.13' KOP= 1800' Max Angle = 57 @ 4628' Datum MD = 12504' DatumTVD= 8800' SS IPB . 2052' 1-l4-1/2" OTIS SSSV NIP, ID - 3.813" I J ~ ST GAS LIFT MANDRELS 2755' MD TVD DEV TYÆ VLV LATCH PORT DATE 5 3142 2936 42 CAMCO DMY RK 0 05/05/06 L 4 7865 5723 55 CAMCO DMY RK 0 05/05/06 3 10477 7401 45 CAMeO DMY RK 0 05/05/06 2245' 2 11827 8315 48 CAMCO DMY RK 0 05/05/06 PLE 1 12129 8516 48 CAMeO DMY RK 0 05/05/06 . 12158' 1-14-1/2" PARKER SWS NIP, ID - 3.813" I - - - I 12169' H RIGHT-HAND RELEASE LATCH I g Cut -12,162' MD-- ~ :8 ....... 12170' 1-19-5/8" 9-CR-1 MO TrN HBBP A<R, ID = 3.875" I asDrill-12,203' MD_ ~ - NRI 12195' II . . I 12223' 1-14-1/2" PARKER SWS NIP, ID - 3.813" I . I 12245' 1-i4-1/2" PARKERSWN NIP, ID - 3.725" I 8" I 12257' I 12257' J-i4-1/2" WLEG I I 12257' H ELMD TT LOGGED 09/27/91 I 81" I 12461' µ ~ RY 07/29/91 @ 12480' istorical perf data pn/Sqz DATE C 03/19/92 C 09/27/91 SAFETY NOTES: ***CHROME TBG & LNR*** THERE IS A HISTORY OF PROBLEMS RETRIEVING TOOLS THROUGH THE TAILPIPE. DEFORMITY 1 OBSTRUCTIONS IDENTIRED ON BHTV SURVEY 08/02192 Tol 13097' I 6" I 13175' 113-3/8" CSG, 68#, NT-80, 10= 12.415" I Minimum ID = 3.725" @ 1 4-1/2" PARKER SWN NIP Tubin 4-1/2" F I TOP OF 7" L 14-1/2" TBG, 12.6#, 13-CR, .0152 bpf, 10 = 3.95 19-5/8" CSG, 47#, NT-80S NSCC, ID = 8.6 ÆRFORA TION SUMMA REF LOG: HLS BHCS ON ANGLEATTOPÆRF: 48 Note: Refer to Production OB for h SIZE SPF INTERV AL 0 2-5/8" 6 12480 - 12510 3-3/8" 6 12653 - 12678 17" LNR, 26#, 13-CR, .0383 bpf, 10 = 6.27 . TREE = WELLHEA[)= ACTUATOR = KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum1VD= 4-1/16" 5MCIW 13-5/8" 5M FMC BAKER 64.83' 37.13' 1800' 57 @ 4628' 12504 ' 8800' SS . F-48 RWO AFETY NOTES: "'CHROM E TBG & LNR'" IC Pack-Off Rep & Stacker Pkr Camp Ips f'-. New IC Packoff . 4-1/2" X-Nipple -2200' MD 2755' ~ ~ GAS LIFT MANDRB..8 I ST MD 1VD DEV lYÆ VLV LATCH PORT DATE 5 42 CAMCO DMY RK 0 05/05/06 ipple -12,099' MD · I 4 55 CAMCO DMY RK 0 05/05/06 acker -12,111' MD- :8 :8 3 45 CAMCO DMY RK 0 05/05/06 ipple -12,136' MD · : 2 48 CAMCO DMY RK 0 05/05/06 ipple -12,158' MD · 1 48 CAMCO DMY RK 0 05/05/06 rshot -12,170' MD - .- :8 - 12170' 1-19-5/8" 9-CR-1 MO TIW HBBP PKR, ID = 3.875" 1 ð NR I 12195' 11III I I . 12223' H4-1/2" PARKERSWS NIP, ID = 3.813" I I . I 12245' 1-14-1/2" PARKER SWN NIP, ID = 3.725" I 8" 1 12257' I 12257' H4-1/2" WLEG I I 12257' H ELMD TT LOGGED 09/27/91 1 81" 1 12461' 1----.4 ~ RY 07/29/91 12480' storical perf data pn/Sqz DATE C 03/19/92 Minimum ID = 3.725" -12,158' c 09/27/91 4-1/2" XN-NIPPLE ml 13097' I 6" 1 13175' 113-3/8" CSG, 68#, NT-80, ID = 12.415" I 4-1/2" X-N 9-5/8" x 4-1/2" S-3 P 4-1/2" X-N 4-1/2" XN-N Unique 4-1/2" Ove ITOP OF 7" L 14-1/2" TBG, 12.6#, 13-CR, .0152 bpf, ID = 3.95 19-5/8" CSG, 47#, NT-80S NSCC, ID = 8.6 ÆRFORA TION SUMMA REF LOG: HLS BHCS ON ANGLEATTOPÆRF: 48 @ Note: Refer to A-oduction DB for hi SIZE SPF INTERVAL 0 2-5/8" 6 12480 - 12510 3-3/8" 6 12653 - 12678 17" LNR, 26#, 13-CR, .0383 bpf, ID = 6.27 DA TE REV BY COMMENTS DA TE REV BY 08/04/91 ORIGINAL COMPLETION 08/26/01 RN/KAK CORRECTIONS 09/23/05 EZUPJC WAIVER SFTY NOTE DELETED 05/12/06 WTS/PA GLV C/O (05/05/06) 10/11/06 RCTfTLH PX A...UG SET 05/17/07 jgr RWO COMMENTS PRUDHOE BA Y UNIT WELL: F-48 ÆRMIT No: 1"1910860 API No: 50-029-22187-00 SEC 2, T11 N, R13E, 1914' FNL & 2863' WEl... BP Exploration (Alaska) . TREE = VIlELlHEA [) = ACTUATOR = KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum lVD = . 4-1/16" 5M CrN 13-5/8" 5M FMC BAKER 64.83' 37.13' 1800' 57 @ 4628' 12504' 8800' SS F-48 RWO New IC Packoff w /9-5/8" TB & Stacker Pkr Corrp 9-518" ES Cementer -2700' MD 113-3/8" CSG, 68#, NT-80, ID = 12.415" I 4-1/2" X-Nipple -12,099' MD 9-5/8" x 4-1/2" 8-3 Packer -12,111' MD - 4-1/2" X-Nipple -12,136' MD 4-1/2" XN-Nipple -12,158' MD Unique 4-1/2" Overshot -12,170' MD ITOP OF 7" LNR I 12195' 14-1/2" TBG, 12.6#, 13-CR, .0152 bpf, ID = 3.958" I 12257' I 9-5/8" CSG, 47#, NT-80S NSCC, ID = 8.681" I ÆRFORA TION SUMMARY REF LOG: HLS BHCS ON 07/29/91 ANGLEAT TOP ÆRF: 48 @ 12480' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DATE 2-5/8" 6 12480 - 12510 C 03/19/92 3-3/8" 6 12653 - 12678 C 09/27/91 1 PBTDI 13175' 13097' 17" LNR, 26#, 13-CR, .0383 bpf, ID = 6.276" I DATE REV BY COMMENTS DATE REV BY 08/04/91 ORIGINAL COM PLETION 08/26/01 RN/KAK CORRECTIONS 09/23/05 EZLlPJC WAIVER SFTY NOTE DELETED 05/12/06 WTS/PA GLV C/O (05/05/06) 10/11/06 RCT/TLH PX PlUG SET 05/17/07 jgr RWO COMMENTS AFETY NOTES: "'CHROM E TBG & LNR'" 9-5/8" Tie-Back (40#, L-80, TC-II) -2700' MD Cemented 9-5/8" x 13-3/8" Annulus 4-112" X-Nipple -2200' MD ST MD 5 4 3 2 1 lVD GAS LIFT MANDRElS DEV 1YÆ VLV LATCH 42 CAfv1CO DMY RK 55 CAfv1CO DMY RK 45 CAfv1CO DMY RK 48 CAfv1CO DMY RK 48 CAfv1CO DMY RK PORT DATE o 05/05/06 o 05/05/06 o 05/05/06 o 05/05/06 o 05/05/06 12170' -l9-5/8" 9-CR-1 MO TrN HBBP PKR, ID = 3.875" I 12223' -l4-1/2" PARKER SWS NIP, ID = 3.813" 12245' -i4-1/2" PARKER SWN NIP, ID = 3.725" 12257' -l4-1/2" WLEG I 12257' H ELMD TT LOGGED 09/27/91 Minimum ID = 3.725" -12,158' 4-1/2" XN-NIPPLE PRUDHOE BAY UNrr WELL: F-48 ÆRMrr No: "1910860 API No: 50-029-22187-00 SEC 2, T11N, R13E, 1914' FNL & 2863' WEL BP Exploration (Alaska) ·TREE= WB..lH~[} = ACTUA TOR = KB. B..EV = BF. B..EV = KOP= Max Angle = Datum MD = Datum lVD = 4-1/16" 5MCIW 13-5/8" 5M FMC BAKER 64.83' 37.13' 1800' 57 @ 4628' 12504' 8800' SS . F-48 RWO with 7" Scab Liner SÞFETYNOTES: ***CHRO\£ 1BG & LNR*** New IC Packoff I TOP OF 7" LNR I 4-1/2" X-Nipple -2200' MD 113-3/8" CSG, 68#, NT-80, 10 = 12.415" I 2755' lVO GAS LIFT MANDRELS OEV ìYÆ VLV LATCH CAMCO OMY RK CAMCO OMY RK CAMCO DMY RK CAMCO DMY RK CAMCO DMY RK PORT DATE o 05/05/06 o 05/05/06 o 05/05/06 o 05/05/06 o 05/05/06 Baker ZXP Liner Top Packer -3000' MD- ST MD 5 4 3 2 1 Minimum 10 = 3.725" @ 12,190' MD 4-1/2" XN-NIPPLE 7" Scab Liner (26#, L-BO, TC-II) f/xxxxx' - 12,195' MD (Fully Cemented) 4-1/2" X-Nipple -12,396' MD S-3 Packer -12,145' MD 4-1/2" X-Nipple -12,167' MD 4-1/2" XN-Nipple -12,190' MD 112,202' MC-14-1/2" WLEG I 14-1/2"TBG, 12.6#, 13-CR, .0152bpf, 10=3.958" H 12,461' I 19-5/8" CSG, 47#, NT-80S NSCC, 10 = 8.681" I ÆRFORA TION SUMMARY REF LOG: HLS BHCS ON 07/29/91 ANGLE AT TOP ÆRF: 48 @ 12480' Note: Refer to A-oduction OB for historical perf data SIZE SPF INTERV AL Opn/Sqz OA TE 2-5/8" 6 12480 - 12510 C 03/19/92 3-3/8" 6 12653 - 12678 C 09/27/91 I PBTDI 13175' 13097' 17" LNR, 26#, 13-CR, .0383 bpf, 10 = 6.276" I OA TE REV BY COMMENTS OA TE REV BY 08/04/91 ORIGINAL COM PLETION 08/26/01 RN/KAK CORRECTIONS 09/23/05 ezuPJC WAIVER SFrY NOTE OB..ETED 05/12/06 WTS/PA GLV C/O (05/05/06) 10/11/06 RCT/TLH PX PLUG SET 05/11/07 JGR RWO w /1" Scab Liner COMMENTS PRUDHOE BAY UNIT WB..L: F-48 ÆRMIT No: "'1910860 API No: 50-029-22187-00 SEC 2, T11 N, R13E, 1914' FNL & 2863' WB.. BP Exploration (Alaska) PBU F-48 (191-086) workover . . John, I have completed reviewing the sundry application and am forwarding it to the Commissioners recommending approval. Since the actual scope of the workover is dependent on the assessment that will be accomplished once the well is "opened up", please keep us advised of the work path once it is determined. An email with more specifics regarding possible 9-5/8" cut depths and/or information regarding the scab liner. Hopefully, the packoff will be the culprit. Call or message with any questions. Good luck. Tom Maunder, PE AOGCC 1 of 1 6/5/2007 6:43 PM MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU' Julie HeusSer, ~'~'% COmmissioner Tom Maunder, P. I. Supervisor DATE' December 7, 2000 FROM. Jeff Jones, Petroleum InspeCtor SUBJECT: Safety Valve Tests Prudhoe Bay Unit BPX / F-Pad ThUrsday, December 7, 2000: I traveled to BPX's F-Pad in the Prudhoe Bay Field to witness Safety Valve System tests. Merv Liddelow, BPX representative in charge of testing, performed the tests in a safe and proficient manner. Of the 28 wells tested, 10 failures were witnessed. For the most part, frozen contaminants (water) in the block valves upstream of the pilots and in the SSV hydraulic control lines caused the failures. On 12/8/00 Mr. Liddelow indicated to me that aii SVS failures had been corrected and J J_ successfully re-tested. The 17.8% SVS failure rate requires a 90-day test cycle for this pad. The AOGCC test report is attached for reference. I conducted 28 well house inspections concurrent with the SVS tests. Due to recent high winds, several well houses were drifted with snow inside. In addition, SVS hydraulic fluid leaks Were noted on wells F-12 and F-13A. Mr. Liddelow indicated that these items would be addressed. No other exceptions were noted. SUMMARY: I witnessed SVS tests and conducted well house inspections on BPX's F-Pad in the Prudhoe Bay Field. 17.8% failure rate = 90 day test cycle. 28 wells, 56 components tested. 10 failures. 17.8% failure rate. 28 well house inspections conducted. .Attachments: SVS PBU F Pad 12-7-00 JJ CC' NON-CONFIDENTIAL SVS PBU F Pad 12-7-00 JJ.doc Alaska Oil and Gas Conservation CommisSion Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Jeff Jones Submitted By: Jeff Jones Field/Unit/Pad: PBF/PBU/F Pad Separator psi: LPS 156 Date' 12/7/00 HPS 828 Well Permit Separ Set · L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI Trip Code Code Code Passed GASorC¥CLE F-01 1700460 828 550 525 p p OIL F-02 1700560 828 550 500 P p OIL F-03 1700580 F-04 1710020 156 125 125 p p OIL F'05 1710090 F-06 1710120 ' 'F-07 1720230 F-08 1740110 F-09 1790760 F-10A 20006701 F'llA 2000620 828, 550 500! P p OIL F-12 1791070 828 550 550 p p OIL F-13A 1961520 828 550 525 p p OIL F-14' 1800120 F-15 1811300 828 550 490 P p OIL F-16A 1961600 156 125 0 1 p OIL F-17A 1941630 156 125 130 p p OIL F-19 1811060 F-21 1890560 156 125 125 p p OIL F-22 1890620 156 ' 125 125 p p OIL F-23A 1990740 156 125 125! P p OIL F-24 1831540 F-26A 1981890 156 125 125 P 4 OIL F-27 : 1861690! 828 ,550 0 1 p OIL F-28 1861590 828 550 500 p p OIL F-29 1861330 828 550 250 3 4 OIL !F-30 1891100 F-31 1861570 F-32 1890330 828 550 520 p p OIL F-33. 1960030 F-34A 1961090 F-35 1880810 828 550 525 p p OIL iF-36 1951960 828 550 0 2 p OIL F-37 1890990 828! 550 550 p p OIL 12/13/00 page 1 of 2 SVS PBU F Pad 12-7-00 JJ.xls Well Permit Separ Set LfP Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI Trip Code Code Code Passed gAS or CYCLE F-38 1901350 - F-39 1901410 156 125 125 P P OIL F-40 1911170 828 550 0 1 5 OIL F-41 1911040 828 550 530 P P OIL F-42 1901580 F-43 1910750 156 125 125~ P P OIL ~F-44 1910080 F-45 1910280 828 550 0 1 P OIL F-46 1901780i 828 550 50 3 P OIL F-47A 2000350! 156 125 130 P P OIL F-48 1910860 156 125 100 P P OIL Wells: 28 Components: 56 Failures: 10 Failure Rate: 17.8%[~ 9o Day Remarks: 12/13/00 Page 2 of 2 SVS PBU F Pad 12-7-00 JJ.xls THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE NOVEMBER 2 2000 E E PL E W M A TE R IA L U N D E TH IS M A R K E R C:LORI'uMFILM. DOC R STATE OF ALASKA ALA,°C"~'~..OIL AND GAS CONSERVATION COMMISS~ ' REPORT L,: SUNDRY WELL OPE,.-;ATIONS 1. Operations performed: Operation shutdown ~ Stimulate X Plugging__ Pull tubing__ Alter casing . Repair well Perforate__ Other__ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3362' NSL, 2863' WEL, SEC. 02, T11N, R13E At top of productive interval 3645' NSL, 3296' WEL, SEC. 34, T12N, R13E At effective depth 3412'NSL, 1539'WEL, SEC. 34, T12N, R 13E At total depth 3945' NSL, 3546' WEL, SEC. 34, T12N, R13E 5, Type of Well: Development Exploratory Stratigraphic Service ORIGINAL 6. Datum elevation (DF or KB) KBE=64.83 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number F-48(22-34-12-13) 9. Permit number/approval number 91-86 / 10. APl number 50- 029-22187 11. Field/Pool Prudhoe 0il Pool 12. Present well condition summary Total depth: measured true vertical 13175' feet 9306' feet Effective depth: measured true vertical Casing Length Structural -- Conductor 110' 20" Surface 2727' 13-3/8 Intermediate 12433' 9 5/8" Production -- Liner 980' 7" Perforation depth: measured 12653'- 12678' 13097' feet 9256' feet Size Plugs (measured) Junk (measured) Cemented 3790 cu ft Arcticset fl 2760 cu ft Class "G" 296 cuft Class 'G' Measured depth 2755' 12461' 12195-13175 True vertical depth BKB 2679' 8836' 8656-9307 true vertical subsea8899'- 8916' Tubing (size, grade, and measured depth) 4 1/2" NT-13Cr @ 12257' Packers and SSSV (type and measured depth) Packer @ 12170'& SSSV@2052' 13. Stimulation or cement squeeze summary See Attachment FEB 26 1996 Alaska Oil & Ga~ Cons. Cornmissim~ Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pr..essure · 822 1216 ~ .19!4.,. :.: .~..:~'i i" " ~ . 2960 1279 1470 '.:~ , 2625 ' 3040 Tubing Pressure 246 246 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operat!.ons Oil X Gas.__ Suspended 17, I here_b..v-cer¢~ that.the fo,,,~going is truc-an.~orrect to the best of my knowledge. Signed ~ //./¢~ -~,,//" .Z~. '/..~,/...~/~,.~..¢:',~.¢¢.~;~._~.,/~~~ .~ ~---- -- Title *chnical Assistant III Form 10-404 Rev 06/15/88 Service f SUBMIT IN DUPLICATE WELL F-48(22-34-12-13) Stimulation Operation 6/24/95 A CTU/HCL with TAM Pkr Treatment was performed to remove scale using the following fluids: SUMMARY Start in hole with TAM packer. Pumped hole volumn, but were unable to fluid pack well. Continue in hole and dropped thru jewerly and tubing tail. Pull up thru tubing tail and nipples. Had good "locates". Try to drop back thru "SWS" nipple, but unable to get thru. Try with pump rate. Still unable to get down hole. Quit trying. Pull out of hole. Close swab. Lay down tools and packer. Packer ok, tools ok. Cap BOPs and secure well for night. Do something different in AM.Resume operations. Pick up BHA//2. Start in hole while pumping sea water to flush tubing. Drop thru jewedy and tubing tail. Set TAM Single Set packer with center of element at 12,620" CTD. Rig up BJ. Hold safety meeting and pressure test lines. BJ pump 100 bbls of 5% HCL and acidize the perforations from 12,653' to 12,678'. Displace coil and over-flush acid into perfs with 200 bbls filtered sea water. Rig down BJ. Release packer and pull up to tubing tail. Park to relax element. Enter tubing tail and eased thru jewerly. Continue pulling out of hole. Finished out of hole. Closed swab valve and remove fusible cap. Lay down packer and tools. Rig down CTU. Leave well shut in. Turn well over to MOC, Pad Operator, and Trico for flowback. TAM SS packer worked perfect again. Had no trouble getting into tubing tail and thru nipples. Lost rubber (approx 90%) element around 5000' as indicated on weight indicator. All bands recovered. No evidence of communication above packer during job. FLUIDS PUMPED BBLS 562 100 200 Sea Water (filtered) 5%HCL (chrome inhibs added. Also Fe 300 and Fe210). Sea Water Displace/Over-flush. (filtered and fric reducer). LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 17 April 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PFC/PERF FINAL BL+RF ECC No. Run # 1 2385.02 Run # 1 4880.05 Run # 1 5643.03 Run # 1 5758.01 · Run ~ 1 5797.01 Run # 1 6105.03 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please sign and return Petroteehnical Data Center R E C E IV E D BP Exploration (Alaska) In~ 900 Eas~ Benson Boulevard Anchorage, AI~. 99~0~ APR 2 0 1995 . ,___(~__d~_ ...: ~/~_..~ ntl & Gas cons. Commission Received by LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 6 April 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 73- c-0 1 CCL/CUT FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS/STATIC FNL BL+RF 1 CN/GR FINAL BL+RF 1 PLS/STATIC FNL BL+RF ECC No. Run ~ 1 1811.02 Run # 1 3560.03 Run ~ 1 5643.02 Run # 1 5718.07 Run # 1 6275.03 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please sign and ~etux~ Petrotechnical Data Cente~ BP Exploration (Alaska) In~ 900 East Benson Boulevard · ".t~- ................ - --------'~' -"?'-"-_. com,,eu~" <~-~}SAnh oC°ns' Commission , ¥ LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. RECEIVED JAN 2. 7 1995 Alaska Oil & Gas Cons. Commisslon Anchorage Date: 24 January 1995 RE: Transmittal of Data Sent by: MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION 1 PLS FINAL BL + RF 1 PLS FINAL BL + RF 1 PLS FINAL BL + RF 1 PLS FINAL BL + RF Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 5607.10 5643.01 6345.00 6346.00 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: STATE OF ALASKA A,.-~,_,r~ OIL AND GAS CONSERVATION COMMISS~,.,,q REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate__ Plugging Pull tubing __ Alter casing __ Repair well __ 2. Name of Operator BP Exploration (Alaska) Inc. Perforate X ~' Other X :-: _~ 6. Datum elevation (DF or KB) "'" ' 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3362' NSL, 2863' WEL, SEC. 02, T11N, R13E At top of productive interval 3645' NSL, 3296' WEL, SEC. 34, T12N, R13E At effective depth 3412'NSL, 1539'WEL, SEC. 34, T12N, R13E At total depth 3945'NSL, 3546' WEL, SEC. 34, T12N, R13E 5. Type of Well: Development Exploratory Stratigraphic Service 7. Unit or Property name Prudhoe Bay Unit 8. Well number F-48(22-34-12-13) 9. Permit number/approval number 91-86 / 10. APl number 50- 029-22187 11. Field/Pool Prudhoe 0il Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 13175' feet Plugs (measured) 9306' feet 13097' feet Junk (measured) 9256' feet Casing Length Size Cemented Structural -- Conductor 110' 20" Surface 2727' 13-3/8 3790 cu ft Arcticset II Intermediate 12433' 9 5/8" 2760 cuft Class "G" Production -- Liner 980' 7" 296 cu fl Class 'G' Perforation depth: measured 12653'- 12678' Measured depth 2755' 12461' 12195-13175 True vertical depth BKB 2679' 8836' 8656-9307 true vertical subsea8899'- 8916' Tubing (size, grade, and measured depth) 4 1/2"NT-13Cr @ 12257' Packers and SSSV (type and measured depth) Packer @ 12170' & SSSV@2052' 13. Stimulation or cement squeeze summary See Attachment ,Anchora!To Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 2380 2111 102 1003 4290 j' 3944 950 1841 357 48O 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service I Date ~J/'~_/_~'/'~'~ SUBMIT IN DI~:)L(CAT'E 17. I hereby certify that the foregoj,,'rEiis true ~_~ correct to the best of my knowledge. Signed {~ (~// /~LC~,q~~' Title SeniorTechnicalAssistantl Form 10-4~'¢1~v 06/15/88 //' 3/11/92 3/19/92 3/25/92 WELL F-48(22-34-12-13) I-1YD ULIC FRACTURE/Addperf A Hydraulic Fracture was performed using the following fluids: FRAC TREATMENT: Pumped job as per design. Flush Job. Pumped 15000# 20/40 CL AND 20000# OF 16/20 CL Pumped, Total of 29,500# CL to Formation and 5500# CL Left in liner FLUID SUMMARY: 20 bbls 50# Gel Prepad to Establish Rate 50 bbls 50# X-Link Gel Pad w/9% ESL 123 bbls 50# X-Link Gel w 35,000# CL 195 bbls 20# Gel Flush 170 bbls Diesel to PT Lines and Freeze Protect The following interval were added perforation using 2.62" guns, 4 SPF, random orientation and 1 80° phasing. 1 2480' - 12500' MD 1 2500' - 12510' MD A Hydraulic Fracture (SAG) was performed using the following fluids: FRAC TREATMENT: A total of 82,000# of proppant(20/40 Carbolite) was pumped. Estimate 76,100 # behind pipe w/5,900# left in the tubing/liner (2,890 # due to underflush & 3,020# due to tail-off) FLUID SUMMARY: 20 bbls 50# Gel Prepad to Establish Rate 1 74 bbls 50# X-Link Gel Pad 73 bbls 50# X-Linked Gel W/1 PPG Carbolite 1 2 bbls 50# X-Linked Gel W/2 PPG Carbolite 1 8 bbls 50# X-Linked Gel W/3 PPG Carbolite 21 bbls 50# X-Linked Gel W/4 PPG Carbolite 23 bbls 50# X-Linked Gel W/5 PPG Carbolite 24 bbls 50# X-Linked Gel W/6 PPG Carbolite 26 bbls 50# X-Linked Gel W/7 PPG Carbolite 182 bbls 50# X-Linked Gel W/8 PPG Carbolite 186 bbls 50# Gel Frae Flush fjh 4/28/93 -. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 08/12/92 T# 83797 BP CASED HOLE FINALS Enclosed is your copy of the maueria!s !isled below. If you have any questions, please contact BP Well Records a~ (907) 564-4004. 07/19/92 #1 07/25/92 ~1 07/22/92 #! 07/27/92 #! 07/21/92 #i 07/25/92 #1 07/27/92 #! 07/19/92 #i 07/18/92 #1 07/18/92 #i 07/24/92 #1 07/20/92 #! 11150 9800 10900 2300 11250 8600 9100 10800 9680 9480.00- 9815.00 C.~MCO 5 " 2300 00-12756.00 CA34CO 2/5" 00-11390.00 CAMCO 5 " 00-10068 00 CAMCO 5 " 00-1!!I0 00 CAMCO 5 " 00- 9290 00-11898 00- 9744 00- 9420 00-11177 00-10005 00 CAMCO 2/5" 00 CA=MCO 5 " 00 CAMCO 5 " 00 CAMCO 5 " 00 CAMCO 5 " O0 CAMCO 5 " 11900 00-12720 00 CAMCO 5 " Information Control Well Records Adrian J. Martin RECEIVED AUG 2,5 1992 Alaska 0il & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 04/21/92 T% 83429 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. G-14~/-/~J'CCL 04/17/92 %1 9150.00- 9630.00 ATLAS 5 " F-48~,t'~ PRODUCTION LOG 04/13/92 %1 12400.00-12600.00 SCM 5 " Z-32~.~ POSTSET PLG/SET/MECH PLG 04/14/92 #1 10080.00-11004.00 SCH 5 " Information Control Well Records Adrian J. Martin RECEIVED MAY 1 a 1992 Alaska 0il & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 04/16/92 T# 83419 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. s-c3 GAS LIFT SURVEY 03/22/92 #1 Y-10 81-~INJ 03/23/92 #1 Y-24~g-113 INJ 03/25/92 #1 D-27~'~3 PROD-F 04/01/92 #1 Z-07~O--~2 GAS LIFT SURVEY 03/25/92 #1 A-16~fZ~ MISC GAS INJ 03/31/92 #1 A-037~3~ MISC GAS INJ 03/31/92 #1 F-37~--~_ LEAK DET 03/19/92 #1 N-11~'/Z~ GAS LIFT SURVEY 03/20/92 #1 F-489/'~ TEMP 03/22/92 #1 U-02~'/~GAS LIFT SURVEY 03/20/92 #1 Y-27~- ~ INJ 03/23/92 #1 S-32~'/~ PITS 03/24/92 #1 S-01~Z--~; GAS LIFT SURVEY 03/22/92 #1 A-11 ~l-Fg MISC GAS INJ 03/26/92 #1 2500.00-12104.00 CAMCO 2 " 9200.00-10123.00 CAMCO 5 " 13100.00-13430.00 CAMCO 5 " 9350.00- 9644.00 CAMCO 5 " 2500.00-12738.00 CAMCO 2 " 10520.00-11084.00 CAMCO 5 " 11600.00-11915.00 CAMCO 5 " 8600 00-10400.00 CAMCO 2 " 2500 00-10200.00 CAMCO 2/5" 0 00- 3000.00 CAMCO 5 " 2500 00- 9920.00 CAMCO 2 " 12900 00-13247.00 CAMCO 5 " 10100 00-10548.00 CAMCO 5 " 2500 00-10674.00 CAMCO 2 " 9750.00-10050.00 CAMCO 5 " Information Control Well Records Adrian J. Martin Ri £EIVrr. D APR 2 4 1992 Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 03/24/92 T# 83343 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. R-06 ~'~'~"INJ R-12 ~.~ ' 33'- COMPLETION F-48 ~/~¢~ CCL/PERF Y-28 C- 13 ~]/~PFC W- 10 TUBING CUTTER W- 11 ~--!,;TUBING CUTTER X-09 ~-~PBS 5 " 03/18/92 #1 03/20/92 #1 03/19/92 01 03/16/92 01 03/12/92 #1 03/11/92 #1 03/13/92 #1 03/11/92 #1 9750.00-10074.00 SCH 5 " 10595.00-10936.00 SCH 5 " 12000.00-12584.00 ATLAS 5 " 8806.00- 9408.00 ATLAS 5 " 10905.00-11297.00 ATLAS 5 " 13534.00-13710.00 ATLAS 5 " 11659.00-12532.00 ATLAS 5 " 11100.00-12116.00 ATLAS Information Control Well Records Adrian J. Martin RECEIVED Alaska 0il & Gas Cons. Commission Anchorage STATE OF ALASKA ~ ~. ~. ' ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RI:COMPLETION REPORT AND LOG 1. Stalus of Well Classification of Service Well OIL [] GAS [] ~ [] ABANDONED [] SERVlCE [] 2. Name of Operator 7. Permit Number BP Exploration 91-86 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22187 4. Location of well at surface '.:' '-~ ........ 9. Unit or Lease Name 3362' NSL, 2863' WEL, SEC. 02, T11N, R13E ..........,, ~. ,.._.~ '. Prudhoe Bay Unit At Total Depth .............. '-~:b . 3954'NSL, 3546' WEL, SEC. 34, T12N, R13E ,. ':'L ~5 ..~ 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE 64,83 I ADL 28278 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. J15. Water Depth, if offshore 116. No. of Completions 7/11/91 7/26/91 9/27/91I N/Aeet USE I ONE 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional SurveY13175~MO 9306'rvo 13097'MD/9256' rvo YES D( NO [] IO' Depth where SSSV set ]21iThickness O' Perma'rOs t205~eet MD 910' 22. Type Elomri¢ or Other ko~s Run 23. CASING, LINER AND CEMENTING FI~,,ORD SE'I-riNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTI~IG RECORD AMOUNT PULLED 13 3/8' 68# NT-80 Surface 2755' 17-1/2" 3790 cu ft Arcticset II 9 5/8' 47# NT-80S Surface 12461' 12-1/4" 2760 cuft C/ass 'G' 7' 26# NSCC 12195' 13175' 8-1/2" 296 cuft C/ass 'G' 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET(MDI PACKER SET(MD) Schlumberger 3-3/8" 6 spf 4 1/2" NT- 13Cr 12257' 12170' MD TVD (SS) 12653' - 12678' 8899' - 8916' ~6. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 13-3/8"X 9-5/8" Freeze protect annulus - 161 BBLs dry crude 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 9/27/91 I F/owing D'~te of Test Hours Tested PRODUCTE~ FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE ~GAS-OIL RATIO TEST PERIOD I~ Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL :3IL GRAVITY-APl (corr) Press. 24-HOUR RATE I~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RECEIVED glaska Oil & ~as Cons. ^n~h0rag~ Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE -_: ~.~ 30. GEOLOGIC MARKERS I-ORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag 12464' 8837' Shublik A 12533' 8884' Zone 4 12648' 8960' 31, LIST OF ATTACHMENTS 32. I hereby cedify that the foregoing is true and correct to the best of my knowledge Signe~. ~ ~.-¢x.¢-.,~-~ '~-"~-~-"~--'~Title ~¢niorTechnica/Assistant Date (//~'/~----~( INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24 : If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP EXPLORATION (ALASKA), INC. DAVY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday, July 11, 1991 WELL' F-45 (22-34-!2-!3). AP! No. 50-029-22187 Day: 1 Depth at 0600 Hrs. = 0 Ft. 24 Hour Footage = _0_ Ft. Reason for Overexoenditure' Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #28E 125456 Qtjrrent Operation: Mixing Spud Mud Summary_ of Last 24 Hours:. Wove pipe sheds, boiler complex, motor complex, pits @ sub from Well F-43. set pits. Rig up rig. Mix spud mud. Rig accepted @ 0001 on 7-11-91. Spot sub over F-48 .. Mud Type Mud Weight Viscosity. Spud CC/gal Sec. PV YP Fluid Loss Solids. "T0mo oF CC .,. Survey. Depth Angle. Direction N-S E-W Dog Leg TVD Section Coordinate Coordinate °/100' RECEIVED JAN 2 9 ~992 Alasla Oil & Gas Cons. Commission ;Anchorage Reviewed By: BP EXPLORATION (ALASKA), DAILY DRILLING REPORT: As of 0600 Hrs. Friday. July 12. 1991 WELL: F-48 (22-34-12-1~) INC. PRI~DHOE BAY UNIT APl No. 50-029-22187 Day: 2 Depth at 0600 Hrs. = 1,400 Ft. 24 Hour Footage = 1,400 Ft. Reason for Overcxpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #1 8-E 1,25456 Current Operation; Drilling Summary_ of Last 2--4 Hours: Drill 17-1/2" hole to 703'. POH for bit change. Mud Typo Mud Weight Ct/gal RIH drill and survey to 1400'. Viscosity P V YP Fluid Loss Solids Sec. cc N-S E-W , Temp , oF Dog Leg Survey ~ Angle Section Coordinate Coordinate °/100' Reviewed By- BP EXPLORATION (ALASKA), INC. DAILY DRILI~ING REPORT: As of 0600 Hrs. Monday. July 15. 1991 WELL: F-48 (22-34-12-13} PRUDHOE BAY UNIT APl No. 50-029-22187 Day: 5 Depth at 0600 Hrs. = 3,150 Ft. 72 Hour Footage = 1,750 Ft. Reason for Overexpenditure' Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #28E 125456 Current Operation: Drilling Summary of Last 72 Hours' Drilled 17-1/2" hole to 2765'. 3150'. Ran and cemented 13-3/8" casing at 2765'. Drilled 12-1/4" hole to Mud Type LOW .Mud Weight Viscosity P V Y__~P 9.0#/gal 34Sec. 4 5 Fluid Loss Solids 'Temp 12.0cc 500% °F Survey Depth Angle Direction TVD Section Coordinate Coordinate 0/100' Reviewed By: ~/~ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: As of 0600 Hrs. Tuesday. d~.ly 16. 1991 WELL: F-45 (22-~4-12-]~) .PRLIDHOE BAY UNIT APl No. 50-029-2.2187 Day: 6 Depth at 0600 Hrs. = 4,844 Ft. 24Hour Footage = 1.494 Ft. Reason for Overexpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Ria #18-E -- 125456 Current Operation; Drilling SUmmary .of Last 24 Hours: Drilled the 12-1/4" hole to 4644'. Mud TvDe . . LSND Mud Weight 9.2#/gal Viscosity 36Sec. P V YP. Fluid Loss Solids TemD 7 5 11.6cc 600% . ', ' °F Survey Q.c,D. JJ3. Angle N-S E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: ,~ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRI. IDHOE BAY UNIT As of 0600 Hrs. Wednesday. July 17. 1991 WELL: F-48 (22-~4-12-1~) APl No. 50-029-22187 Day: Z Depth at 0600 Hrs. = 6.294 Ft. 24 Hour Footage = 1.650 Ft. Reason for Overexpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabar,s Rig #18E 125456 Current Ooeration' POH F/Washout Summary of Last 24 Hours: Drilled the 12-1/4" hole to 6294'. Mud Type Mud Weight Viscosity LSND 9.3#/gal 38Sec. P¥ YP, Fluid Loss Solids , Temp 6 5 10.0cc 730% ' °F Survey ~ Angle N-S E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRLIDHOE BAY UNIT As of 0600 Hrs. Thursday. July 18. 1991 WELL: F-4~ (22-~4-12-13) APl No. ~;0-029-22187 Day: 8 Depth at 0600 Hrs. = 6,918 Ft. 24 Hour Footage = 624 Ft. Reason for Overexpenditure: Rig- AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #18E 125456 Current Opere, tion; POH BHA Change Summary of Last 24.Hours: Drilled the 12-1/4" hole to 6918'. Mud Type Mud Weight Viscosity LSND 9.4#/gal 40Sec. P¥ YP Fluid Loss Solids ., T. emD 9 11 10.0cc 750% ' °F Survey Depth Angle N-$ E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed By: BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: As of 0600 Hrs. Friday. July 19. 1991 WELL: F-45 (22-~4-12-1;3) PRLIDHOE BAY UNIT APl No. 50-029-22187 Day: 9 Depth at 0600 Hrs. = 7,613 Ft. 24 Hour Footage = 695 Ft. Reason for Overexpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost - Nabors Rio #18E 125456 Current Ooeration: POH BHA Change Summary of Last 24 Hours: Tripped for BHA. Drilled 12-1/4" hole at 7613'. POH BHA change. Mud Type Mud Weight Viscosity P V. LSND 9.45#/gal 37Sec. 7 .YP ~ Solids TemD 7 9.0cc 850% , °F Survey DeDth Angle N-$ E-W Dog Leg TVD Sectiorl Coordinate Coordinate °/100' Reviewed By' ¢ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: As of 0600 Hrs. Monda, y, July 22. 1991 WELL: F-48 (22-34-12-13) PRI, JDHOE BAY UNIT APl No. 50-029-22187 Day: .1 2 Depth at 0600 Hrs. = 2,487 Ft. 72 Hour Footage = ,1 01100 Ft. Reason for Overexpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabor$ Rig #18E 125456 Current Operation' Drilling Ahead Summary of Last 72 Hours: Drilled the 12-1/4" hole to 10100'. Mud Type LSND Mud Weioht 9.7#/gal Viscosity 38Sec. pv YP Fluid Loss Solids , Temp 1 0 8 7.0 cc ? ' °F Survey Deoth Angle Directior~ N-S E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: As of 0600 Hrs. Tuesday. July 23.1991 WELL: F-45 (22-34-12-13) PRI. IDHOE BAY UNIT APl No. 50-029-22187 Day: 1 3, Depth at 0600 Hrs. = 101950 Ft. 24 Hour Footage = 850 Ft. Reason for Overexpenditure: Rig' AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabor$ Rig Cf18E 1 25456 Current Operation: Drilling Summary of Last 2_&4Hours· Drilling the 12-1/4" hole to 10192'. Trip for bit & BHA. Drilled to 10950'. Mud Ty.o~ Mud Weight Viscosity P V YP LSND 9.75#/gal 38Sec. 7 7 Fluid Los~ Solids Temp 6.0 cc ? ' °F Survey Deoth Anole Direction TVD -- N-S E-W, Dog leg Section Coordinate Coor~lina~te °/100' Reviewed By: BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday. July 24. 1991 WELL: F-4~ (22-~4-12-13) APl No. 50-029-22187 Day: 1 4 Depth at 0600 Hrs. = 11.450 Ft. 24 Hour Footage = 500 Ft. Reason for Overexpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabor$ Rig Cf18E 125456 Current Operation; Drilling Ahead Summary of Last 24 Hours: Drilled 12-1/4" hole to 11450. Mud TvDe _ . LSND Mud Weight 9.8#/gal Viscosity 39Sec. PV YR Fluid Loss Solids ., T. emp 1 0 7 5.0 cc ? °F Survey Depth Angle Direction N-S E-W Dog Leg TVD, Section Coordinate ,Coordinate °/100' Reviewed By: BP EXPLORATION (ALASKA), INC. DALLY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday, July 25, 1991 WELL: F-45 (22-34-12-13~ AP! No. 50-029-22187 Day: 1 5, Depth at 0600 Hrs. = 11,967 Ft. 24 Hour Footage = ~; 17 Ft. Reason for Overexpenditt~re: Rig' AFE Number: AFE Amount = Current Costs = Estimated Final Cost = NabQr$ Rig #18E 125456 Current Ooeration' RIH Summary of Last 24 Hours' Drilled the 12-1/4" hole to 11967'. Mud Type LSND Mud Weight 9.7#/gal Viscosity 38Sec. PV, yp Fluid Loss Solids 9 8 5.8cc '~ ' Temp , °$ Survey Depth Anale Direction TVD N-$ E-W Section Coordinate Coordinate Dog Leg o/100' Reviewed By' ~"~/u(~ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: As of 0600 Hrs. Friday. July 26. 1991 WELL: F-48 (22-34-12-1~) PRUDHOE BAY UNIT APl No. 50-029-22187 Day: 1 6 Depth at 0600 Hrs. = ,504 Ft. 24 Hour Footage = 12,471 Ft. Reason for Overexpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Ria #18E -- 125456 Current Operation' RU Csg Crew Summary_ of Last 24Hours: Drilled 12-1/4" hole to 12471'. CBU, pump pill & POH. LD BHA, RU to run 9-5/8" casing. Mud Type Mvld Weight Viscosity LSND 9.7#/gal 38Sec. , P V YP Fluid Loss Solids Tem.~ 8 7 5.8cc ? . .°F Survey Depth Angle Direction N-S_ E-W Dog Leg TVD Section Coordinate ,Coordinate °/100, Reviewed By: BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday. July 29. 1991 - WELL: F,-45 (22-34-12-13~ APl NO. ~0-029-22187 Day: 1 8 Depth at 0600 Hrs. = 13,175 Ft. 72 Hour Footage = 704 Ft. Reason for Overexpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = .Nabor$ Rig #18E 125456 Current Ooeration' RIH with logging tools Summary of Last 72 HoUrs· Ran and cemented the 9-5/8" casing. Drilled the 8-1/2" hole to 13175'. Mud Type Mud Weight Viscosity p V YP Polymer 8.6 #/gal 38 Sec. 6 8 Fluid Loss Solids 8.2cc 200% .Temp oF Survey Deoth Anale pirection TVD -- N-S E-W Section Coordinate Coordinate Dog Leg ?/100' Reviewed By: -";(~ BP EXPLORATION (ALASKA), INC. DA]I,Y DRILLING REPORT: As of 0600 Hrs. Tuesday. July 30, 1991 WELL: F-48 (22-34-12-13~ PRUDHOE BAY UNIT APl No. 50-029-221 87 Day: 20 Depth at 0600 Hrs. = 13,175. Ft. 24 Hour Footage = O Ft. Reason for Overexpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #18E 125456 Current Operation: POOH w/fish. Summary of Last 24 Hours:. R/U logger. Log run #1: GR/Neutron/BCS/HRi. strip over W/L. Circ. Catch fish. POOH. Log f/13178'. Tool stuck on second pass. RIH to Mud Type Mud Weigh. t Cf/gal Viscosity P V YP Fluid Los8 Solids Temp sec. cc °F Survey Depth Angle Direction N-S E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday. July 31. 1991 : WELL: F-48 (22-34-12-13) AP! No. 30-029-22187 Day: ,,21. Depth at 0600 Hrs. = 13,1 75 Ft. 24 Hour Footage = O Ft. Reason for Overexpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nab0rs Rig #18E 125456 Current Operation; RIH w/Inr. Summary of Last 24 Hours:, POOH w/fish. L/D fish tools & fish. RIH w/bit. Wash & ream f/13150'-13175'. CBU. Short trip to shoe. CBU. POOH. R/U Weatherford. RIH w/7" lnr. MudType Mud Weight Viscosity P V YP, Fluid,L08s Solids T~mp #/gal Sec. cc °F Survey Depth A n__ngJ.~ Direction TVD N-S E-W Dog Leg Section Coardinate Coordinate ?,/10,0' Reviewed By: ,Z' '~ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY U.NIT. As of 0600 Hrs. Thursday. August 1. 1991 WELL: F-48 (22-34-12-13) AP! No. 50-029-22187 Day: 22 Depth at 0600 Hrs. = 13.175 Ft. 24 Hour Footage = 0 Ft. Reason for Overexpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabors Rig #18E 125456. Current Operation: POOH. Summary of Last 24 Hours: RIH w/4-1/2" tbg. M/U TIW lnr hgr. Circ. RIH w/Inr on DP. Tag btm. CBU. Pump 40 bbls water, 50 bbls high vis sweep. Pump cmt as per program. POOH 7 stds. L/D cmt hd. Circ. POOH. Mud Type Mud Weight Viscosity ,.P V YP Fluid Loss Solids Temp Cf/gal Sec. cc °F Survey Depth Angle Direction N-S E-W Dog Leg TVD Section Coordinate Coordinate. °/100' Reviewed By: BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: As of 0600 Hrs. Friday. Auoust 2. 1991 WELL: F-48 (22-~4-12-13) PRUDHOE BAY UNIT APl No. 50-029-22187 Day: 23 Depth at 0600 Hrs. = 13.175 Ft. 24 Hour Footage = 0 Ft. Reason for Overexpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nab0r$ Rig #18E 125456 Current Operation; Clean pits, change to bdne. Summary_ of Last 24 Hours: RIH w/bit, scraper. Tag cmt @ 12011'. Drlg cmt f/12011'-12200' (top of Inr). CBU. POOH. L/D BHA. RIH w/bit, scraper. Test lnr lap. Drlg TIW packoff, cmt f/12200'-12230'. RIH. Tag cmt @ 12905'. Drlg cmt f/12905'-13097' (LC). CBU. MudType Mud Weight Viscosity PV yP Fluid Los~ Solids #/gal Sec. cc Temp oF Survey ~ Angle .D. LE¢_c, JJ.~ TVD N-,,S, E-W Section Coordinate Coordinate Dog Leg o/100' Reviewed By:'¢ "-'"' "' BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday. AuauSt 5. 1991 -- WELL: F-41~ (22-34-12-13) APl No. .,50-029-22187. Day: 26 Depth at 0600 Hrs. = ~ Ft. 72 Hour Footage = O Ft. Reason for Overexpenditure: Rig' AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Nabor$ Rig Cf18E 125456 Current Operation; Rig Released @ 15:00 h rs. Summary_ of La, st 72Hours: Circ. Test int to 3000 psi. POOH. RIH w/4-1/2" tbg. M/U hgr. Land tbg. N/D BOPE. N/U tree. Pump 184 bbls diesel dn tbg. Set pkr. Install BPV. Rig released @ 15:00 hrs, 8/4/91. Rig repair & maintenance. , MudType Mud Weight Viscosity P ¥ YR Fluid Loss Solids Temp #/gal Sec. cc °F Angle Direction N-S E-W Dog Leg TVD Sectiorl Coordinate Coordin.ate °/100, Reviewed 1" = 5280' T12N T11N WELL No. F-48 LAT. -- 70°20'18.24.8" LONG. = 148°4-6'00.940" y -- 5,974,882.73 A.S.P. X = 651,958.63 ZONE 3,362' FROM SOUTH UNE 2,863' FROM EAST LINE 0 1 2 I I . R[CEIV£D (MILES) ------_~_~ JAN ~ 1 1992 Alaska Oil & Gas Cons. Anchorag~p~r_, SURVEYOR s CERTIFICATE o~..~.,,,,,,.,.,,,,L.~ i hereby certify that I am properly ~ registered and licensed to practice ~-~*~ ~ ~Oo./~ land surveying in the State of Alaska, _~ -~$* 49th and that this plat represents a ~_ '~ .... ~. ~ '~ ........ /)'"'e su~y made by n~e o~ under my ~,....~ .,~5~.....~.~...Z~...~~ supervision, and that all dimensions ~.--/o~'~ Dou~ia" s A C, raeth~- and other details are correct '-o"J.~ ' ~'z-~- - · ~.~ NoLSTa35 Date June 12, 1991 LS No. 7835 '~.~.~. ~Reglstered Land Su~e~r WELL PAD "F" WELL No. F-48 ASBUILT LOCATED IN PROTRACTED SECTION 2, TOWNSHIP 11 NORTH, RANGE 15 EAST, UMIAT MEREDIAN, ALASKA SURVEYED FOR: B.P. EXPLORATION P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 SURVEYED BY: ARCTIC SLOPE CONSULTING GROUP 301 DANNER SUITE 200 ANCHORAGE, ALASKA 99518 BY: DAG [DATE: 6/10/91 11 '~2N 35 T11N 2 · F-58 I! · F-4i I! · F-42 2863' RECEIVED JAN 51 ~/asJ~ Oil .& Gas Co~s, 2 11 NO SCA~ F-~ WELL PAD "F' WELL No. F-48 ASBUILT LOCATED IN PROTRACTED SECTION 2, TOWNSHIP 11 NORTH, RANGE 1,3 EAST, UMIAT MERE:DIAN, ALASKA B.P. EXPLORATION P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 SURVEYED BY= ARCTIC SLOPE CONSULTING GROUP ,301 DANNER SUITE 200 ANCHORAGE, ALASKA 99518 DRAWN BY: DAG , f DATE: 6/12/91 r TELECO Teleco Oilfield Sel s of Alaska Inc. 6116 Nielson Way Anchorage, AK 99502 (907) 562-2646 August 1, 1991 JOB #839 PRUDHOE BAY DRILLING GROUP WELL: F-48 PRUDHOE BAY Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to the Prudhoe Bay Drilling Group. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, Jonathan G. Mapes Field Operations Supervisor JGM/el Enclosures A ,~l~'l' COMPANY TELECO OILFIELD SERVICES SURVEY CALCULATIONS Company: BP EXPLORATION Well: F-48 Location: PBU Rig: NABORS 18E TELECO Job # Grid Correction: Magnetic Declination: Total grid correction: Proposed Direction: 839 0.0° 30.0° 30.0° 315.6° MINIMUM CURVATURE CALCULATION Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 0 0 0.0 0.0 0.01 0.00 0.01N 0.01E 0.01 N 45.00E 0.00 SPERRY-SUN GYRO SURVEYS 434 434 0.3 214.0 434.00 -0.16 0.74S 0.52W 0.90 S 35.17W 0.06 964 530 0.1 197.0 964.00 -0.62 2.14S 1.30W 2.50 S 31.33W 0.03 1469 505 0.9 92.0 1468.98 -3.70 2.70S 2.53E 3.70 S 43.20E 0.18 TELECO SURVEYS 1604 135 3.1 293.0 1603.92 -1.10 1.31S 0.23E 1.33 S 10.08E 2.93 PAGE 1 Company: BP EXPLORATION, Well: F-48, Location: PBU, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 1697 93 5.8 317.6 1696.64 5.92 3.15N 5.25W 6.12 N 59.07W 3.49 1790 93 8.6 315.8 1788.90 17.57 ll.60N 13.27W 17.63 N 48.83W 3.02 1884 94 '12.7 315.8 1881.26 34.94 24.06N 25.38W 34.97 N 46.53W 4.36 1978 94 15.5 320.7 1972.42 57.79 41.19N 40.54W 57.79 N 44.55W 3.24 2072 94 17.5 314.8 2062.55 84.44 60.87N 58.53W 84.44 N 43.88W 2.77 2166 94 21.3 313.4 2151.20 115.64 82.57N 80.97W 115.64 N 44.44W 4.07 2260 94 23.6 315.8 2238.07 151.52 107.79N 106.50W 151.53 N 44.65W 2.63 2353 93 24.7 315.8 2322.93 189.57 135.07N 133.02W 189.57 N 44.56W 1.18 2448 95 26.9 318.3 2408.46 230.89 165.35N 161.16W 230.89 N 44.27W 2.58 2542 94 27.6 321.4 2492.03 273.80 198.24N 188.89W 273.83 N 43.62W 1.68 2636 94 28.7 325.3 2574.92 317.73 233.82N 215.33W 317.87 N 42.64W 2.28 2715 79 31.3 323.9 2643.33 356.74 266.00N 238.22W 357.08 N 41.85W 3.41 2796 81 32.9 323.6 2711.94 399.35 300.71N 263.68W 399.94 N 41.25W 1.99 2890 94 35.3 320.4 2789.78 451.72 342.20N 296.15W 452.55 N 40.87W 3.19 PAGE 2 Company: BP EXPLORATION, Well: F-48, Location: PBU, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 2984 94 38.1 315.5 2865.16 507.81 383.83N 333.80W 508.67 N 41.01W 4.31 3075 91 40.0 315.5 2935.82 565.14 424.72N 373.99W 565.91 N 41.37W 2.10 3168 93 42.2 313.0 3005.90 626.25 467.36N 417.79W 626.87 N 41.79W 2.94 3263 95 44.5 313.0 3074.97 691.39 511.84N 465.47W 691.84 N 42.28W 2.42 3357 94 48.4 312.0 3139.73 759.40 557.85N 515.70W 759.69 N 42.75W 4.22 3452 95 49.8 312.7 3201.92 831.08 606.23N 568.75W 831.26 N 43.17W 1.57 3545 93 51.2 311.3 3261.08 902.69 654.23N 622.08W 902.78 N 43.56W 1.90 3608 63 52.5 310.9 3300.00 952.08 686.80N 659.42W 952.12 N 43.83W 2.12 3645 37 52.8 312.0 3322.44 981.41 706.27N 681.46W 981.43 N 43.98W 2.52 3737 92 53.3 313.4 3377.75 1054.84 756.14N 735.49W 1054.84 N 44.21W 1.32 3832 95 53.1 312.3 3434.66 1130.81 807.87N 791.25W 1130.81 N 44.40W 0.95 3926 94 53.6 312.2 3490.77 1206.10 858.58N 847.08W 1206.11 N 44.61W 0.54 4019 93 53.5 312.3 3546.02 1280.77 908.88N 902.45W 1280.81 N 44.80W 0.14 PAGE 3 Company: BP EXPLORATION, Well: F-48, Location: PBU, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 4114 95 53.4 312.3 3602.60 1356.96 960.24N 958.90W 1357.03 N 44.96W 0.11 4209 95 53.7 312.8 3659.04 1433.26 1011.91N 1015.19W 1433.38 N 45.09W 0.53 4303 94 54.0 312.3 3714.48 1509.06 1063.24N 1071.11W 1509.23 N 45.21W 0.54 4395 92 54.1 311.9 3768.49 1583.39 1113.18N 1126.37W 1583.63 N 45.34W 0.37 4489 94 55.5 311.7 3822.67 1660.03 1164.37N 1183.64W 1660.35 N 45.47W. 1.50 4584 95 56.9 311.5 3875.52 1738.77 1216.78N 1242.67W 1739.19 N 45.60W 1.48 4675 91 56.4 311.6 3925.54 1814.60 1267.20N 1299.56W 1815.12 N 45.72W 0.56 4769 94 56.0 311.1 3977.83 1892.49 1318.81N 1358.20W 1893.13 N 45.84W 0.61 4862 93 56.2 310.7 4029.69 1969.42 1369.35N 1416.55W 1970.21 N 45.97W 0.41 4954 92 56.2 309.8 4080.87 2045.53 1418.75N 1474.89W 2046.50 N 46.11W 0.81 5044 90 55.7 311.1 4131.27 2119.79 1467.12N 1531.64W 2120.94 N 46.23W 1.32 5136 92 56.0 312.0 4182.91 2195.74 1517.63N 1588.61W 2197.02 N 46.31W 0.89 5229 93 55.6 311.0 4235.17 2272.46 1568.61N 1646.22W 2273.89 N 46.38W 0.99 PAGE 4 Company: BP EXPLORATION, Well: F-48, Location: PBU, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 5321 92 55.5 311.5 4287.22 2348.10 1618.64N 1703.25W 2349.69 N 46.46W 0.45 5411 90 54.9 311.2 4338.58 2421.79 1667.46N 1758.73W 2423.54 N 46.53W 0.72 5506 95 53.9 311.5 4393.88 2498.82 1718.49N 1816.71W 2500.73 N 46.59W 1.08 5600 94 53.2 311.3 4449.73 2574.22 1768.50N 1873.43W 2576.30 N 46.65W 0.76 5695 95 53.2 311.3 4506.64 2650.07 1818.70N 1930.58W 2652.32 N 46.71W 0.00 5788 93 53.3 311.3 4562.28 2724.37 1867.88N 1986.56W 2726.79 N 46.76W 0.11 5879 91 52.9 314.0 4616.93 2797.04 1917.18N 2040.07W 2799.55 N 46.78W 2.42 5973 94 52.6 314.7 4673.82 2871.84 1969.49N 2093.57W 2874.36 N 46.75W 0.67 6067 94 52.0 314.6 4731.30 2946.21 2021.76N 2146.49W 2948.72 N 46.71W 0.63 6161 94 52.4 315.1 4788.91 3020.48 2074.15N 2199.15W 3022.97 N 46.68W 0.59 6249 88 49.3 314.4 4844.46 3088.70 2122.19N 2247.60W 3091.18 N 46.64W 3.58 6339 90 49.4 315.1 4903.09 3156.98 2170.26N 2296.09W 3159.45 N 46.61W 0.60 6433 94 51.1 315.8 4963.20 3229.25 2221.77N 2346.79W 3231.67 N 46.57W 1.90 PAGE 5 Company: BP EXPLORATION, Well: F-48, Location: PBU, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 6528 95 51.7 316.4 5022.46 3303.49 2275.27N 2398.27W 3305.83 N 46.51W 0.80 6623 95 52.4 316.1 5080.89 3378.39 2329.38N 2450.07W 3380.66 N 46.45W 0.78 6717 94 53.1 316.4 5137.78 3453.21 2383.43N 2501.81W 3455.40 N 46.39W 0.79 6812 95 54.3 317.3 5194.03 3529.76 2439.29N 2554.17W 3531.84 N 46.32W 1.48 6906 94 55.6 317.0 5248.01 3606.68 2495.71N 2606.50W 3608.65 N 46.24W 1.41 7000 94 55.5 317.2 5301.18 3684.17 2552.49N 2659.26W 3686.04 N 46.17W 0.20 7095 95 56.2 317.2 5354.51 3762.76 2610.18N 2712.68W 3764.52 N 46.10W 0.74 7191 96 56.3 317.2 5407.85 3842.56 2668.75N 2766.91W 3844.22 N 46.03W 0.11 7286 95 55.9 317.3 5460.83 3921.37 2726.65N 2820.43W 3922.94 N 45.97W 0.43 7380 94 55.8 317.4 5513.60 3999.13 2783.86N 2873.14W 4000.60 N 45.90W 0.14 7475 95 55.9 317.3 5566.93 4077.72 2841.69N 2926.40W 4079.10 N 45.84W 0.14 7538 63 56.0 317.5 5602.20 4129.89 2880.12N 2961.74W 4131.22 N 45.80W 0.31 7573 35 55.8 316.9 5621.82 4158.87 2901.38N 2981.43W 4160.16 N 45.78W 1.54 PAGE 6 Company: Bp EXPLORATION, Well.: F-48, Location: PBU, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 7667 94 55.2 315.8 5675.06 4236.33 2957.43N 3034.90W 4237.57 N 45.74W 1.16 7763 96 55.3 317.3 5729.78 4315.19 3014.70N 3089.14W 4316.39 N 45.70W 1.29 7855 92 54.9 317.1 5782.42 4390.62 3070.06N 3140.41W 4391.74 N 45.65W 0.47 7950 95 53.5 317.1 5837.99 4467.64 3126.50N 3192.86W 4468.71 N 45.60W 1.47 8045 95 53.4 316.5 5894.57 4543.94 3182.13N 3245.10W 4544.96 N 45.56W 0.52 8140 95 53.3 316.8 5951.27 4620.15 3237.56N 3297.42W 4621.12 N 45.52W 0.27 8234 94 52.9 317.2 6007.71 4695.30 3292.53N 3348.69W 4696.22 N 45.48W 0.54 8328 94 52.7 317.1 6064.55 4770.15 3347.43N 3399.61W 4771.01 N 45.44W 0.23 8423 95 51.9 316.4 6122.64 4845.30 3402.17N 3451.11W 4846.12 N 45.41W 1.02 8516 93 51.0 316.9 6180.59 4918.02 3455.06N 3501.04W 4918.82 N 45.38W 1.05 8611 95 50.7 316.3 6240.56 4991.69 3508.60N 3551.66W 4992.45 N 45.35W 0.59 8703 92 50.6 316.6 6298.90 5062.82 3560.16N 3600.68W 5063.56 N 45.32W 0.27 8797 94 50.6 317.1 6358.56 5135.45 3613.15N 3650.35W 5136.14 N 45.29W 0.41 PAGE 7 Company:. BP EXPLORATION, Well: F-48, Location: PBU, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 8890 93 50.5 316.0 6417.66 5207.25 3665.29N 3699.73W 5207.91 N 45.27W 0.91 8985 95 50.6 316.4 6478.02 5280.60 3718.24N 3750.50W 5281.25 N 45.25W 0.33 9080 95 50.6 316.4 6538.32 5354.00 3771.40N 3801.13W 5354.63 N 45.22W 0.00 9174 94 50.5 316.0 6598.05 5426.59 3823.79N 3851.36W 5427.19 N 45.21W 0.34 9268 94 50.4 314.7 6657.90 5499.06 3875.36N 3902.29W 5499.67 N 45.20W 1.08 9364 96 50.4 314.1 6719.10 5573.01 3927.11N 3955.14W 5573.63 N 45.20W 0.48 9460 96 50.2 315.4 6780.42 5646.86 3979.11N 4007.59W 5647.49 N 45.20W 1.06 9555 95 49.8 314.8 6841.48 5719.63 4030.66N 4058.96W 5720.26 N 45.20W 0.64 9650 95 49.6 314.8 6902.93 5792.08 4081.71N 4110.37W 5792.71 N 45.20W 0.21 9745 95 48.8 315.1 6965.00 5863.99 4132.52N 4161.27W 5864.63 N 45.20W 0.88 9839 94 48.1 315.0 7027.35 5934.33 4182.31N 4210.96W 5934.98 N 45.20W 0.75 9934 95 47.1 315.0 7091.41 6004.48 4231.92N 4260.56W 6005.13 N 45.19W 1.05 L0028 94 46.5 315.1 7155.76 6073.00 4280.42N 4308.97W 6073.65 N 45.19W 0.64 PAGE 8 Company: BP EXPLORATION, Well: F-4.8, Location: PBU, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 10122 94 45.6 315.1 7220.99 6140.67 4328.36N 4356.74W 6141.32 N 45.19W 0.96 10214 92 45.2 314.8 7285.59 6206.17 4374.64N 4403.10W 6206.83 N 45.19W 0.49 10310 96 45.0 315.5 7353.35 6274.17 4422.85N 4451.06W 6274.83 N 45.18W 0.55 10404 94 44.8 315.5 7419.93 6340.53 4470.18N 4497.57W 6341.19 N 45.17W 0.22 10498 94 45.2 315.5 7486.40 6407.00 4517.59N 4544.16W 6407.65 N 45.17W 0.43 10591 93 45.4 315.5 7551.81 6473.10 4564.74N 4590.49W 6473.75 N 45.16W 0.22 10685 94 46.1 315.8 7617.40 6540.43 4612.89N 4637.56W 6541.08 N 45.15W 0.78 10779 94 46.6 316.2 7682.29 6608.45 4661.81N 4684.80W 6609.08 N 45.14W 0.61 10871 92 47.2 316.2 7745.15 6675.62 4710.30N 4731.30W 6676.23 N 45.13W 0.65 10966 95 47.6 316.5 7809.45 6745.54 4760.90N 4779.57W 6746.14 N 45.11W 0.48 11061 95 48.3 316.9 7873.08 6816.07 4812.24N 4827.94W 6816.64 N 45.09W 0.80 11155 94 48.7 316.4 7935.37 6886.46 4863.43N 4876.27W 6887.02 N 45.08W 0.58 11250 95 48.5 315.8 7998.19 6957.72 4914.78N 4925.68W 6958.26 N 45.06W 0.52 PAGE 9 Company: BP EXPLORATION, Well: F-48, Location: PBU, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 11343 93 48.5 316.3 8059.82 7027.37 4964.92N 4974.02W 7027.90 N 45.05W 0.40 11436 93 48.6 316.5 8121.38 7097.07 5015.40N 5022.10W 7097.58 N 45.04W 0.19 11530 94 48.2 316.9 8183.79 7167.35 5066.56N 5070.30W 7167.84 N 45.02W 0.53 11623 93 47.6 317.2 8246.14 7236.33 5117.06N 5117.32W 7236.80 N 45.00W 0.69 11715 92 47.7 317.8 8308.11 7304.29 5167.19N 5163.25W 7304.73 N 44.98W 0.49 11807 92 47.7 317.6 8370.03 7372.29 5217.52N 5209.05W 7372.70 N 44.95W 0.16 11902 95 47.8 317.9 8433.91 7442.57 5269.58N 5256.33W 7442.95 N 44.93W 0.26 11996 94 47.5 318.3 8497.23 7511.98 5321.28N 5302.73W 7512.32 N 44.90W 0.45 12091 95 47.5 318.3 8561.41 7581.94 5373.58N 5349.32W 7582.25 N 44.87W 0.00 12185 94 47.5 319.7 8624.92 7651.12 5425.88N 5394.79W 7651.40 N 44.84W 1.10 12279 94 47.4 320.7 8688.48 7720.15 5479.08N 5439.11W 7720.38 N 44.79W 0.79 12371 92 47.5 321.1 8750.70 7787.65 5531.68N 5481.86W 7787.83 N 44.74W 0.34 12406 35 47.5 321.1 8774.34 7813.33 5551.76N 5498.06W 7813.49 N 44.72W 0.00 PAGE 10 T E~-'!C 0 O~lf~eld PLAN VIEW Service= 12800 BP EXPLORATION F-48 PBU NABORS 1BE JOB# 839/O0 SCALE: 1 inch = ~600 feet + i2406 11807 iii55 ~0498 9839 '~ 9174~_+ 8516 7950 7380 55064 4200'~ 3608%+ 2890 '~. .0~ ' 11200 96OO 8000 6400 z 0 4800 3200 1600 1600 8000 6400 4800 3200 i600 0 WEST (ft) 2000 4000 ~6000 I o8000 ~000© 12000 14000 ~6000 1BO00 =lO00 TE~-~CO Oilfield Service VER T I C AL PROJECT I ON 1000 3000 5000 7000 9000 11000 434 .25 deg 964 ' .1 deg ~459 · .9 deg BP EXPLORATION ~554 ' ~2.? deg F-48 k2353 ' 24.? deg PBU '2890' 35 3 d.g NABORS /BE 4.52 ' ]9.8 dOB# 839/00 deg -4~4 ' 53 4 d.g SCALE: 2" ~ inch = 2000 feet 55.2 deg :~00 ' 53.2 deg 68 ' 50.4 deg 934 ' 47.1 deg ~x~Q591 ' 45.4 deg 1,250 ' 48.5 deg VERTICAL SECTION (ft) DIRECTIONAL SURVEY r-~ UIDANCE r~ ONTINUOUS ~ OOL RECEIVED JAN 2 9 1992. .Oil .& Gas Cons. uommission ~chorage Company BP EXPLORATION WelIName F-48 (22-34-12-131(1914'SNL,2826'WEL,SEC 2,T11N,R13EI Field/LocationpRUDHOE BAY, NORTH SLOPEt ALASKA Job Reference No. Date 74967 26-SEPT-91 Loaqed By: Computed By: JACK RATHERT S. DEES GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR BP EXPLORATION F - 48 (22-34-12-13) PRUDHOE BAY' NORTh SLOPE, ALASKA SURVEY DATE: 26-SEP-91 METHODS OF COMPUTATION TOOL LOCATION: INTERPOLATION: VERTICAL SECTION: TANGENTIAL- LINEAR HORIZ. DIST. ENGINEER: JACK RATHERT Averaged deviation and azimuth PROJECTED ONTO A TARGET AZIMUTH OF NORTH 45 DEG 31 MIN WEST COMPUTATION DATE: 19-0CT-91 PAGE 1 BP EXPLORATION F - 48 (22-34-12-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 26-5EP-91 KELLY BUSHING ELEVATION: 64.83 FT ENGINEER: JACK RATHERT INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH PEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 100 2O0 300 4OO 5OO 6OO 700 8OO 900 O0 0.00 O0 100.10 O0 200.10 135 O0 300,10 235 O0 400.10 335 O0 500.10 435 O0 600.10 535 oo 700.10 635 O0 800.10 735 900.10 835 -64.83 35 27 0 0 N 0 0 E 0 12 S 51 39 E 27 0 22 S 40 47 E 27 0 14 N 75 41 W 27 0 0 S 48 40 E 27 0 9 S 52 18 w 27 0 1 N 48 59 W 27 0 ? N 65 t~ ~: 27 0 4 N 12 36 W 27 0 6 N 86 35 E 0 O0 -0 17 -0 62 -0 85 -0 68 -0 68 -0 55 -0 47 -0 29 -0 34 0 O0 0 60 0 37 0 O0 0 O0 0 04 0 O0 0 O0 0 27 0 O0 O.O0 N 0 13 S 0 37 S 0 70 S 0 63 S 0 73 S 0 73 S 0 72 S 0 60 S 0 53 S 0 O0 E 0 11 E 0 50 E 051 E 0 33 E 0 2~ E 0 06 E 0 05 4' 0 16 W 0 05 W 0 O0 N 0 0 E 17 S 38 35 E 62 S 53 29 E 86 S 35 53 E 71 S 27 41 E 77 S 17 58 E 72 S 4 25 E 72 S 4 7 W 62 S 16 42 W 53 S 5 26 W 1000.00 1000.10 935 27 1100.00 1100.10 1035 27 1200.00 1200.09 1135 26 1300 O0 1300 09 1235 26 1400 O0 1400 09 1335 26 1500 O0 1500 08 1435 1600 O0 1600 04 1535 1700 O0 1699 73 1634 1800 O0 1798 94 1734 1900 O0 1897 08 1832 25 21 90 11 25 13 10 0 8 N 70 35 E 0 12 N 74 33 E 0 21 N 82 59 E 0 29 N 87 41 E 0 28 N 87 56 E 0 25 N 84 54 E 2 58 N 66 18 W 5 54 N 43 29 W B 54 N 44 43 W N 46 56 W -0 46 -0 60 -0 87 -1 32 -1 89 -2 44 -0 58 7 09 19 53 38 61 0 O0 0 03 0 O0 0 16 0 O0 0 76 1 56 2 12 3 27 4 87 0 48 S 0 40 S 0 30 S 0 22 S 021 s 0 13 S 0 77 N 5 64 N 14 63 N 27 81 N 0 17 E 0 45 E 0 92 E 1 63 E 2 45 E 3 29 E 1 56 E 4 39 W 13 O1 W 2681W 0 51 S 19 30 E 0 60 S 48 35 E 0 97 S 71 47 E 1 65 S 82 9 E 2 46 S 85 7 E 3 30 S 87 48 E 1 74 N 63 52 E 7 15 N 37 56 W 19 58 N 41 39 W 38.62 N 43 57 W 2000.00 1993 82 1928 99 15 41 2100.00 2089 2200.00 2183 2300.00 2275 2400.00 2366 2500.00 2455 2600.00 2544 2700.00 2631 2800.00 2716 2900.00 2799 56 2024 3O 2118 27 2210 O9 2301 63 2390 24 2479 47 2566 46 2651 18 2734 73 18 18 47 22 2 ~4 24 2 26 25 36 80 27 3 64 30 34 63 32 56 35 35 29 N 47 13 W N 48 31 W N 48 45 W N 46 32 W N 44 39 W N 41 50 W N 37 35 W N 35 47 W N 37 28 w N 41 13 W 455 63 9O 92 72 127 41 166 62 208 48 252 95 299 04 347 30 399 29 1 41 4 O0 2 73 1 78 2 45 2 10 2 30 3 03 361 3 63 45 04 N 64 40 N 66 87 25 N 92 113 68 N 121 142 97 N 151 175 32 N 182 211 O0 N 211 250 33 N 240 292 82 N 272 336 14 N 307 71W 92 8g W 127 89 W 166 79 W 208 36 W 252 91W 299 93 W 347 06 W 399 81W 455 45 33 W 63 90 N 45 11 W 72 N 46 0 W 44 N 46 48 W 67 N 47 0 W 52 N 46 43 W 96 N 46 8 W 05 N 45 7 W 44 N 43 54 W 71 N 42 54 W 78 N 42 29 W 3000.00 2879.01 2814 18 38 25 3100,00 2956.33 2891 3200.00 3030.88 2966 3300.00 3102.36 3037 3400.00 3169.47 3104 3500.00 3234.12 3169 3600.00 3296.68 3231 3700.00 3357.39 3292 3800.00 3417.48 3352 3900.00 3477.35 3412 50 40 27 05 42 55 53 46 14 64 48 59 29 5O 28 85 52 5 56 53 3 65 53 4 52 53 31 N 45 23 W 515 29 N 46 17 W 578 N 47 49 W 645 N 48 2 W 715 N 48 29 W 789 N 48 5O W 865 N 49 21W 943 N 49 22 W 1022 N 49 14 W 1102 N 49 11 w 1182 69 30 14 17 35 2O 49 24 17 1 .96 3.10 1 .77 4.63 1 .58 1 .71 1 .57 0.68 0.17 0.63 379.79 N 349 25 W 515.96 N 42 36 W 424.01 N 394 68 W 579.27 N 42 57 W 469.26 N 443 60 W 645.74 N 43 23 W 516.15 N 495 44 W 715.45 N 43 50 W 565.43 N 550 80 W 789.36 N 44 15 W 615.88 N 608 03 W 865.45 N 44 38 W 666.91 N 667.03 W 943.24 N 45 0 W 718,67 N 727.32 W 1022.49 N 45 21 W 770.80 N T87.92 W 1102.24 N 45 38 W 823,15 N 848.53 W 1182,19 N 45 52 W COMPUTATION DATE: 19-OCT-91 PAGE 2 BP EXPLORATION F - 48 (22-34-12-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 26-SEP-91 KELLY BUSHING ELEVATION: 64.83 FT ENGINEER: JACK RATHERT INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 4000 O0 3536 73 3471.90 53 35 4100 4200 4300 4400 4500 4600 4700 4800 4900 O0 3596 O0 3655 O0 3714 O0 3773 O0 3831 O0 3887 O0 3942 O0 3998 O0 4054 13 3531.30 53 34 49 3590.66 53 40 64 3649.81 53 53 44 3708 61 54 15 16 3766 33 55 15 18 3822 35 56 33 47 3877 6z 55 57 84 3934 01 55 44 85 3990 02 56 6 N 49 7 W 1262 47 N 49 7 W 1342 N 49 13 W 1423 N 49 17 W 1503 N 49 21W 1584 N 49 21W 1665 N 49 24 W 1748 N 49 18 ~ 183~ N 49 33 W 1913 N 49 32 W 1996 76 08 54 25 72 3'7 5! 9~ 55 0 34 0 18 0 61 0 26 0 98 1 08 O 64 0 93 0 69 0 24 875 78 N 909 40 W 1262 53 N 46 5 W 928 981 1033 1086 1139 1193 1247 1301 1355 44 N 970 08 N 1031 70 N 1092 43 N 1153 63 N 1215 57 N 1278 83 N 1341 55 N 1404 31 N 1467 21W 1342 09 W 1423 18 W 1503 52 W 1584 47 W 1666 33 W 1748 56 W 1832 31W 1914 34 W 1997 87 N 46 16 W 26 N 46 25 W 79 N 46 35 W 59 N 46 43 W 17 N 46 51W 92 N 46 58 W 18 N 47 4 ~ 71 h 47 10 ~ 48 N 47 16 w 5000.00 4110 87 4046.04 55 48 5100.00 4167 5200.00 4223 53OO O0 4280 54OO O0 4337 5500 O0 4395 5600 O0 4455 5700 O0 4515 5800 O0 4575 5900 O0 4635 27 4102.44 55 39 76 4158.93 55 40 38 4215 55 55 24 59 4272 76 55 10 45 4330 62 53 55 04 4390 21 53 5 20 4450 37 52 51 29 4510 46 53 16 44 4570 61 52 35 N 49 12 W 2079 20 N 48 55 W 2161 N 49 0 W 2243 N 49 26 W 2326 N 49 26 W 2408 N 49 24 W 2489 N 49 36 W 2569 N 49 26 W 2649 N 48 58 W 2728 N 47 41W 2806 62 98 24 07 44 55 23 99 78 0 62 0 44 0 53 0 58 0 26 2 05 0 80 0 48 0 77 1 32 1409 22 N 1530 23 W 2080 26 N 47 21W 1463 1517 1571 1624 1677 1729 1781 1833 1887 38 N 1592 55 N 1654 41 N 1717 74 N 1779 81 N 1841 98 N 1902 72 N 1963 96 N 2023 07 N 2083 56 W 2162 80 W 2245 20 W 2327 52 W 2409 46 W 2491 50 W 2571 36 W 2651 85 W 2731 52 W 2811 81 N 47 25 W 29 N 47 29 W 68 N 47 32 W 66 N 47 36 W 18 N 47 40 W 45 N 47 43 W 29 N 47 47 W 19 N 47 49 W 07 N 47 50 W 6000 O0 4696 41 4631 58 52 13 6100 O0 4757 6200 O0 4819 6300 O0 4884 6400 O0 4948 6500 O0 5012 6600 O0 5074 6700.00 5135 6800.00 5195 6900.00 5253 99 4693 78 4754 13 4819 84 4884 11 4947 33 5009 58 5070 48 5130 73 5188 16 51 58 95 51 6 30 49 13 O1 50 13 28 51 12 50 51 52 75 52 39 65 53 45 90 54 58 N 47 10 W 2888 O0 N 46 28 W 2966 N 45 44 W 3045 N 45 32 W 3121 N 45 27 W 3198 N 45 16 W 3275 N 44 46 W 3353 N 44 23 W 3432 N 44 17 W 3512 N 44 16 W 3594 77 4O 9,3 17 6O 89 93 98 24 0 45 0 80 3 36 0 66 1 04 0 84 0 90 1 05 1 O5 1 2O 1940 76 N 2141 84 w 2890 33 N 47 49 W 1994 2049 2102 2156 2210 2266 2322 2379 2437 72 N 2199 23 N 2255 83 N 2310 28 N 2364 69 N 2420 06 N 2475 41 N 2530 71 N 2586 90 N 2643 25 W 2969 91W 3047 54 W 3124 gl W 3200 O1W 3277 35 W 3355 79 W 3434 72 W 3514 46 W 3596 11 N 47 48 W 70 N 47 45 W 18 N 47 42 W 36 N 47 39 W 74 N 47 35 ~ 94 N 47 32 ~ 89 N 47 28 W 84 N 47 23 W O0 N 47 19 W 7000.00 5310.75 5245 92 55 19 7100.00 5367.23 5302 7200.00 5423.38 5358 7300.00 5479 79 5414 7400.00 5536 45 5471 7500.00 5593 20 5528 7600.00 5649 82 5584 7700.00 5706 82 5641 7800.00 5764 32 5699 7900.00 5822 24 5757 40 55 45 55 55 47 96 55 35 62 55 30 37 55 24 99 55 17 99 54 58 49 55 41 53 54 N 44 8 W 3676.37 N 44 3 W 3758.87 N 43 54 W 3841.58 N 43 59 W 3924.12 N 44 0 W 4006.49 N 43 58 W 4088.80 N 43 53 W 4171.19 N 44 0 W 4253.32 N 44 4 W 4335.11 N 43 57 W 4416.60 0.49 0 27 0 83 0 28 0 42 0 38 0 57 0 8O 0 52 1 37 2496 78 N 2700 75 W 3678.04 N 47 15 W 2556 2615 2675 2734 2793 2852 2912 297O 3029 06 N 2758 63 N 2815 09 N 2872 37 N 293O 62 N 2987 99 N 3044 19 N 3101 99 N 3158 64 N 3214 16 W 3760.44 N 47 ll W 60 W 3843.06 N 47 7 W 89 W 3925 50 N 47 3 W 12 W 4007 79 N 46 59 W 29 W 4090 O1 N 46 55 W 47 W 4172 33 N 46 52 W 44 W 4254 38 N 46 48 W 33 W 4336 11 N 46 45 W 95 W 4417 54 N 46 42 W COMPUTATION DATE: 19-0CT-91 PAGE 3 BP EXPLORATION F - 48 (22-34-12-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 26-SEP-91 KELLY BUSHING ELEVATION: 64.83 FT ENGINEER: JACK RATHERT INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORiZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIS~, AZIMUTH FEET DEG/IOO FEET FEET FEET DEG M~N 8000.00 5881 61 5816.78 53 20 8100.00 5941 8200.00 6001 8300.00 6061 8400.00 6123 8500.00 6185 8600.00 6249 8700.00 6312 8800.00 6376 8900.00 6440 N 44 1W 4497.03 41 5876.58 53 11 N 44 34 W 4577.16 50 5936.67 52 56 N 44 26 W 4657.09 95 5997,12 52 37 N 44 39 W 4736.73 09 6058.26 51 54 N 44 32 W 4815.86 52 6120.69 50 48 N 44 6 W 4893,95 07 6184,24 50 31 N 44 19 W 4971.15 73 6247.90 50 23 N 44 38 W 5048.25 39 6311.56 50 26 N 44 52 W 5125.36 18 6375.35 50 20 N 45 7 W 5202.37 0 87 0 34 0 23 0 8O 1 29 1 4~ 0 24 051 04i 0 13 3087 64 N 3270 73 W 4497 91 N 46 39 W 3144 3201 3258 3315 3371 3426 3481 3536 3590 99 N 3326 97 N 3382 77 N 3438 O9 N 3494 01 N 3548 42 N 3602 44 N 3656 22 N 3710 67 N 3765 71 W 4577 77 W 4657 62 W 4737 22 W 4816 76 W 4894 53 W 4971 57 W 5048 85 w 5125 31W 5202 99 N 46 37 W 87 N 46 34 W 48 N 46 32 W 57 N 46 30 W 63 N 46 28 W 78 N 46 26 W 85 N 46 24 W 94 N 46 23 W 93 N 46 22 W 9000 O0 6503.97 6439 14 50 28 9100 9200 9300 9400 95OO 9600 970O 9800 9900 O0 6567.68 6502 O0 6631.52 6566 O0 6695,38 6630 O0 6759.37 6694 O0 6823.60 6758 O0 6888.30 6823 O0 6953.49 6888 O0 7019.63 6954 O0 7086.96 7022 85 50 20 69 50 15 55 50 18 54 5O 8 77 49 52 47 49 32 66 48 58 80 48 13 13 47 11 N 45 22 W 5279 38 N 45 39 W 5356 N 45 53 W 5433 N 46 6 W 5510 N 46 15 W 5587 N 46 23 W 5663 N 46 39 W 5740 N 46 40 W 5815 N 46 44 W 5890 N 46 35 W 5964 46 43 38 22 86 10 91 89 82 O O~ 0 7'7 0 59 0 50 018 0 97 0.46 0.79 1.22 0.90 3644 91N 3819 99 W 5279.93 N 46 21W 3698 3752 3806 3859 3912 3964 4016 4068 4118 94 N 3874 95 W 5357.00 N 46 20 W 65 N 3930 09 W 5433.96 N 46 19 W 12 N 3985 43 W 5510.91 N 46 19 W 35 N 4040 86 W 5587.76 N 46 19 W 29 N 409627 W 5664.40 N 46 19 W 78 N 4151 58 W 5740.65 N 46 19 W 80 N 4206.75 W 5816.48 N 46 19 W 25 N 4261.32 W 5891.48 N 46 20 W 97 N 4315.12 W 5965.42 N 46 20 W 10000 O0 7155 28 7090.45 46 32 10100 10200 10300 10400 10500 10600 10700 lO800 1O9OO O0 7224 O0 7295 O0 7365 O0 7436 oo 7507 oo 7578 O0 7647 O0 7716 O0 7785 63 7159.80 45 42 13 7230.30 44 55 94 7301.11 44 50 90 7372.07 44 46 74 7442.91 45 0 26 7513.43 45 26 98 7583.15 46 9 94 7652.11 46 37 32 7720.49 47 5 N 46 17 w 6037 83 N 46 2 W 6109 N 45 53 W 6180 N 45 54 W 6251 N 45 42 W 6321 N 45 47 W 6392 N 45 55 W 6463 N 45 58 W 6535 N 45 53 W 6607 N 45 29 W 6680 87 78 40 86 43 33 O2 44 40 0 83 0 98 0 40 0 42 0 0 0 0 0 0 4169.32 N 4368 O0 W 6038 44 N 46 20 W 4219.25 N 4419 4268.54 N 4470 4317.70 N 4521 24 4366.85 N 4572 62 4416.07 N 4622 41 4465.51 N 4673 61 4515.35 N 4725 54 4565.73 N 4777 50 4616.70 N 4829 94 w 6110 93 w 6181 63 w 6252 11W 6322 70 w 6393 52 w 6463 04 W 6535 06 W 6608 28 W 6681 48 N 46 20 W 40 N 46 20 W O1 N 46 19 W 47 N 46 19 W 04 N 46 19 W 94 N 46 18 W 62 N 46 18 W 04 N 46 18 W 01 N 46 17 W 11000.00 7853 08 7788 25 47 34 11100.00 7920 20 7855 11200.00 7986 67 7921 11300.00 8053 13 7988 11400.00 8119 52 8054 11500.00 8185 97 8121 11600.00 8252.98 8188 11700.00 8320.53 8255 11800.00 8388.15 8323 11900.00 8455.73 8390 N 45 7 W 6753.94 37 48 8 N 44 59 W 6828.07 84 48 24 N 45 9 W 6902.78 30 48 20 N 45 22 W 6977.50 69 48 26 N 45 16 W 7052.27 14 48 13 N 44 37 W 7127.00 15 47 40 N 43 53 W 7201.21 70 47 25 N 43 12 W 7274.90 32 47 33 N 43 9 W 7348.51 90 47 22 N 43 2 W 7422.16 0 80 4668 48 N 4881 49 W 6754 53 N 46 17 W 35 4720 29 4773 20 4826 54 4878 68 4931 82 4984 27 5038 36 5092 43 5145 90 N 4933 67 N 4986 26 N 5039 83 N 5093 70 N 5145 87 N 5197 39 N 5248 12 N 5298 96 N 5349 92 W 6828 79 W 6903 88 W 6978 06 W 7052 87 W 7127 66 W 7201 39 W 7275 80 W 7348 14 W 7422 65 N 46 16 W 34 N 46 15 W 05 N 46 14 W 82 N 46 14 W 53 N 46 13 W 71 N 46 12 W 37 N 46 10 W 94 N 46 8 W 55 N 46 7 W COMPUTATION DATE: 19-0CT-91 PAGE 4 BP EXPLORATION F - 48 (22-34-12-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 26-SEP-91 KELLY BUSHING ELEVATION: 64.83 FT ENGINEER: JACK RATHERT INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUBISEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 12000 O0 8523.52 8458 69 47 18 12100 12200 12300 12400 12500 12600 12700 12800 12900 O0 8591.31 8526 O0 8658.90 8594 O0 8726.67 8661 O0 8794.45 8729 O0 8862.13 8797 O0 8928.90 8864 O0 8995.55 8930 O0 906~.76 8996 O0 9127.59 9062 48 47 19 07 47 19 84 47 21 62 47 19 30 47 46 07 48 12 72 48 20 93 48 41 76 49 14 N 43 2 W 7495 59 N 42 35 W 7569 N 41 29 W 7642 N 40 56 W 7715 N 40 1W 7789 N 39 36 W 7862 N 39 17 W 7936 N 39 ~9 ~ 8010 N 39 26 W 8085 N 39 0 W 8159 03 6O 92 16 41 43 55 O6 88 0 54 1 02 1 85 1 10 1 05 0 75, 0 8: 1 85 5199 70 N 5399 29 W 7495 95 N 46 5 W 5253 5308 5363 5419 5476 5533 559~ 564S 5707 64 N 5449 35 N 5498 61 N 5547 55 N 5594 15 N 5641 58 N 5689 27 N 5736 23 N 5784 54 N 5831 25 W 7569 63 W 7642 14 W 7716 86 W 7789 93 W 7862 28 W 7936 51W 8010 02 W 8085 6~ W 8159 35 N 46 3 W 87 N 46 1W 15 N 45 58 W 35 N 45 55 W 5~ N 45 51W 52 N 45 48 W 6~ N 45 4~ ~ 09 N 45 41 W 8~ N 45 37 W 13000.00 9192.89 9128.06 49 16 13100.00 9258.04 9193.21 49 17 13175.00 9306.97 9242.14 49 17 N 38 57 W 8235.11 N 38 45 W 8310.38 N 38 45 W 8366.82 2.59 0.00 0.00 5766.44 N 5879.22 W 8235.1~ N 45 33 W 5825.53 N 5926.69 W 8310.38 N 45 30 W 5869.86 N 5962.26 W 8366,83 N 45 27 W COMPUTATION DATE: 19-0CT-91 PAGE 5 BP EXPLORATION F - 48 (22-34-12-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 26-SEP-91 KELLY BUSHING ELEVATION: 64.83 FT ENGINEER: JACK RATHERT INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 0.00 0 O0 0 O0 N 1000.00 1000 2000.00 1993 3000.00 2879 4000.00 3536 5000.00 4110 6000.00 4696 7000.00 5310 8000.00 588~ 9O00.0O 6503 10 935.27 0 8 N 70 35 E -0 82 1928.99 15 41 N 47 13 W 63 01 2814.18 38 25 N 45 23 W 515 73 3471.90 53 35 N 49 7 W 1262 87 4046.04 55 48 N 49 12 W 2079 41 4631.58 52 13 N 47 10 W 2888 75 5245.92 55 19 N 44 8 W 3676 6t 5816.78 53 20 N 44 ~ W 4497 97 6439.14 50 28 N 45 22 W 5279 0 O0 -64.83 0 0 N 0 0 E 0 O0 46 90 29 47 2O O0 37 O3 38 O0 0 41 45 96 379 3~ 875 62 1409 45. 1940 4? 2496 87 3087 01 364~ 48 S 0 04 N 45 79 N 349 78 N 909 22 N 1530 76 N 2141 78 N 2700 64 N 3270 91 N 3819 17 E 0 33 W 63 25 W 515 4O W 1262 23 W 208O 84 W 2890 75 W 3678 73 W 4497 99 W 5279 0 O0 E 0 O0 N 0 0 E 51 S 19 30 E 90 N 45 11W 96 N 42 36 W 53 N 46 5 W 26 N 47 21W 33 N 47 49 W N 47 ~5 ~ N 46 39 W 93 N 46 2] W 10000.00 7155.28 7090.45 46 32 N 46 17 W 6037.83 11000.00 7853.08 7788.25 47 34 N 45 7 W 6753.94 12000.00 8523.52 8458.69 47 18 N 43 2 W 7495.59 13000.00 9192.89 9128.06 49 16 N 38 57 W 8235.11 13175.00 9306.97 9242.14 49 17 N 38 45 W 8366.82 0.83 4169,32 N 4368.00 W 6038.4a N 46 20 W 0.80 4668,48 N 4881.49 W 6754.53 N 46 17 W 0.54 5199.70 N 5399.29 W 7495.95 N 46 5 W 2.59 5766.44 N 5879.22 W 8235.11 N 45 33 W 0,00 5869.86 N 5962.26 W 8366.83 N 45 27 W COMPUTATION DATE: 19-0CT-91 PAGE 6 BP EXPLORATION F - 48 (22-34-12-13) PRUDHOE BAV NORTH SLOPE, ALASKA DATE OF SURVEY: 26-SEP-91 KELLY BUSHING ELEVATION: 64.83 FT ENGINEER: JACK RATHERT INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORZZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0.00 64 73 164 73 264 73 364 73 464 73 564 73 664 73 764 73 864 73 0 O0 64 83 164 83 264 83 364 83 464 564 664 764 864 -64 83 0 O0 100 O0 200 O0 300 O0 83 4OO O0 83 500 O0 83 6O0 O0 83 700 O0 83 800 O0 0 0 N 0 0 E 0 13 5 33 24 E 0 15 S 67 13 E 0 13 S 52 32 W 0 3 N 12 57 W 0 6 S 38 12 W 0 6 N 55 44 ~' 0 6 S 80 32 ~ 0 6 N 39 32 W 0 6 N 69 35 E 0 O0 -0 06 -0 44 -0 95 -0 68 -0 68 -0 58 -0 52 -0 34 -0 30 0 O0 0 24 0 O0 1 70 0 29 0 10 0 24 0 O0 0 O0 0 O0 0 O0 N 0 05 S 0 26 S 0 70 S 0 64 S 0 68 S 0 75 S 0735 0 64 S 0545 0 O0 E 0 03 E 0 36 E 0 64 E 0 33 E 0 29 E 0 08 E 00l E 0 15 w 0 11 W 0 O0 N 0 0 E 06 S 29 16 E 44 S 54 2 E 95 S 42 9 E 72 S 27 31 E 74 $ 23 16 E 75, S 6 9 E 73 S 0 49 E 6C S 12 59 W 55 S ~ 44 W 964 73 1064 1164 1264 1364 1464 1564 1664 1765 1866 964.83 9O0 O0 73 1064 83 1000 73 1164 74 1264 74 1364 74 1464 75 1564 94 1664 54 1764 98 1864 83 1100 83 1200 83 1300 83 1400 83 1500 83 1600 83 1700 83 1800 0 8 O0 0 11 O0 0 16 O0 0 27 O0 0 29 O0 0 30 O0 1 46 O0 5 6 O0 7 29 O0 11 43 N 76 54 E N 74 0 E N 79 29 E N 83 21 E N 89 8 E N 83 48 E N 67 50 W N 46 9 W N 43 49 W N 46 49 W -0 42 -0 54 -0 75 -1 13 -1 69 -2 25 -2 O0 3 72 14.62 31.52 0 O0 0 O0 0 O0 0 38 0 O0 0 O0 5 34 3 88 4 36 2 85 0 0 3 11 22 051 S 0 43 S 0 33 S 0 25 S 0 22 S 16 S 17 N 23 N 11 N 96 N 0 09 E 0 34 E 0 73 E 1 34 E 2 16 E 3 O0 E 2 97 E 2 04 W 9 58 W 21 63 W 2 3 2 3 14 31 0 51 s 10 24 E 0 55 S 38 24 E 0 80 S 65 33 E 1 36 S 79 32 E 17 S 84 16 E O0 S 87 2 E 98 N 86 39 E 82 N 32 16 W 67 N 40 47 W 55 N 43 17 W 1969 92 1964 83 1900 O0 15 12 2074 2180 2288 2398 2510 2623 2738 2858 2981 03 2064 08 2164 56 2264 61 2364 34 2464 42 2564 94 2664 09 2764 99 2864 83 2000 83 2100 83 2200 83 2300 83 24OO 83 2500 83 2600 83 2700 83 2800 O0 17 21 O0 21 29 O0 23 51 O0 25 34 O0 27 10 O0 28 37 O0 31 35 O0 34 23 O0 38 1 N 47 6 W 55.88 N 48 4 W 84.78 N 49 t W 119.97 N 46 47 W 161.95 N 44 4l W 207.87 N 41 23 W 257.67 N 36 53 W 310.09 N 35 46 W 367.10 N 39 59 W 431.21 N 44 55 W 504.17 2 50 3 O7 3 13 1 99 2 47 2 15 2 2 24 2 73 2 84 39 59 N 59 82 110 142 178 219 266 317 371 39 45 W 11 N 60 34 N 87 46 N 118 54 N 151 88 N 185 90 N 218 63 N 252 91 N 292 93 N 341 55 89 N 44 54 W 78 W 84 29 W 120 51W 162 37 W 207 47 W 257 66 W 310 67 W 367 17 W 431 39 W 504 79 N 45 48 W O0 N 46 40 W O0 N 47 1 W 9;" N 46 43 W 68 N 46 2 V~ '~'~ N 44 50 W 34 N 43 28 W 78 N 42 35 W 85 N 42 33 W 3111 24 2964 83 2900.00 40 46 3246 3392 3548 3712 3878 4047 4215 4385 4559 77 3064 92 3164 65 3264 39 3364 97 3464 31 3564 77 3664 30 3764 83 3000.0O 44 2 83 3100.00 48 53 83 3200.00 51 15 83 3300.00 53 4 83 3400.00 53 21 83 3500.00 53 32 83 3600.00 53 41 83 3700.00 54 8 70 3864.83 3800.00 56 4 N 46 32 W 586.03 N 47 51 W 677.44 N 48 29 W 783.83 N 49 11 W 903.01 N 49 21 W 1032.36 N 49 10 W 1165.31 N 49 8 W 1300.46 N 49 15 W 1435.76 N 49 21 W 1572.35 N 49 23 W 1714.91 3 18 3 18 1 63 1 70 0 60 0 99 001 0 6O 0 83 1 35 429 06 N 400 02 W 586.60 N 43 0 W 490 561 640 725 812 900 989 1078 1171 85 N 467 89 N 546 64 N 636 12 N 734 10 N 835 70 N 938 38 N 1040 66 N 1144 74 N 1252 44 W 677.82 N 43 36 W 80 W 784.03 N 44 13 W 51 W 903.08 N 44 49 W 83 W 1032.37 N 45 23 W 75 W 1165.32 N 45 49 W 17 W 1300.55 N 46 10 W 72 W 1435.95 N 46 27 W 48 W 1572.69 N 46 42 W 87 W 1715.42 N 46 55 W COMPUTATION DATE: 19-007-91 PAGE 7 BP EXPLORATION F - 48 (22-34-12-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 26-SEP-91 KELLY BUSHING ELEVATION: 64.83 FT ENGINEER: JACK RATHERT INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 4739 75 3964.83 3900.00 55 38 4917 5095 5272 5447 5616 5782 5948 6111 6270 87 4064.83 4000.00 56 3 67 4164.83 4100.00 55 39 60 4264.83 4200.00 55 26 46 4364.83 4300 O0 54 45 29 4464.83 4400 O0 53 2 52 4564.83 4500 O0 53 13 30 4664.83 4600 O0 52 30 10 4764,83 4700 O0 52 2 40 4864,83 4800 O0 49 25 N 49 25 W 1864 30 N 49 31W 2011 N 48 55 W 2158 N 49 20 W 2303 N 49 25 W 2446 N 49 42 W 2582 N 49 5 W 2715 N 47~.°~ W 2847 N 46 26 W 2975 N 45 3~ W 3099 34 05 73 84 5z~ 0! 08 52 49 0 78 061 0 48 0 64 0 53 0 63 0 42 0 7C 1 81 1269.25 N 1366.50 W 1865 02 N 47 7 W 1364.94 N 1478.61 W 2012 1461.03 N 1589.86 W 2159 1556.72 N 1700 08 W 2305 1650.02 N 1809 04 W 2448 1738.41 N 1912 42 W 2584 1824.77 N 2013 28 W 2717 1912.97 N 211~ 78 W 2849 2000.75 N 2205 59 W 2977 2087.11 N 2294 53 W 3101 30 N 47 17 W 23 N 47 25 W 14 N 47 31 W 5t N 47 38 W 46 N 47 44 W 19 N 47 49 w 40 N 47 50 ~ 85 N 47 47 W 76 N 47 43 w 6425.06 4964.83 4900 O0 50 30 6584.62 5064.83 5000 6748.50 5164 83 5100 6919.37 5264 83 5200 7095.74 5364 83 5300 7273.52 5464 83 5400 7450.06 5564 83 5500 7626.37 5664 83 5600 7800.89 5764 83 5700 7971.85 5864 83 5800 O0 51 45 O0 53 11 O0 55 10 O0 55 45 O0 55 37 O0 55 24 O0 55 20 O0 55 1 O0 53 30 N 45 24 W 3217 46 N 44 50 W 3341 N 44 19 W 3471 N 44 16 W 3610 N 44 3 W 3755 N 43 58 W 39O2 N 43 59 W 4047 N 43 52 W 4192 N 44 4 W 4335 N 43 51W 4474 79 61 11 34 28 71 87 84 44 1 32 071 '1 17 0 92 0 3O 0 23 0 33 061 0 53 0 67 2169 82 N 2378 65 W 3219 64 N 47 38 W 2257 235O 2449 2553 2659 2764 2868 2971 3071 47 N 2466 08 N 2557 27 N 2654 53 N 2755 36 N 2857 04 N 2958 62 N 3059 52 N 3158 36 N 3255 83 W 3343 83 W 3473 54 W 3611 71W 3756 72 W 3903 76 W 4048 50 W 4193 83 W 4336 05 W 4475 86 N 47 32 W 52 N 47 25 W 86 N 47 18 W 92 N 47 11 W 69 N 47 4 W 97 N 46 57 W 99 N 46 51 W 84 N 46 45 W 33 N 46 40 W 8139.04 5964 83 5900 O0 53 7 8304 75 6064 8467 14 6164 8624 79 6264 8781 85 6364 8938 61 6464 9095 54 6564 9252 16 6664 9408 51 6764 9563 79 6864 83 6000 83 6100 83 6200 83 6300 83 6400 83 6500 83 6600 83 6700 O0 52 35 O0 51 13 O0 50 31 O0 50 29 O0 50 20 O0 50 21 O0 50 21 O0 50 6 83 6800.00 49 40 N 44 35 W 4608 39 N 44 39 W 4740 N 44 13 W 4868 N 44 24 W 4990 N 44 49 W 5111 N 45 12 W 5232 N 45 38 w 5353 N 45 59 W 5473 N 46 16 W 5593 N 46 32 W 5712 51 43 27 37 O8 02 56 75 53 001 0 87 1 ol o31 o 46 0 28 0 88 0 46 0 23 0 38 3167 24 N 3348 64 W 4609 20 N 46 36 W 3261 3352 344O 3526 3611 3696 378O 3863 3945 46 N 3441 69 N 3530 10 N 3615 30 N 3700 63 N 3786 54 N 3872 56 N 3958 86 N 4045 83 N 4131 27 W 4741 97 W 4869 91W 499O 98 W 511~ 37 W 5232 50 W 5353 92 W 5474 57 W 5594 55 W 5713 25 N 46 32 W 12 N 46 29 W 90 N 46 26 W 95 N 46 23 W 64 N 46 21 W 56 N 46 20 W 10 N 46 19 W 29 N 46 19 W 08 N 46 19 W 9717.25 6964.83 6900.00 48 50 9867.35 7064.83 7000.00 47 30 10013.85 7164.83 7100.00 46 25 10157.19 7264.83 7200.00 45 0 10298.44 7364.83 7300.00 44 50 10439.35 7464.83 7400.00 44 49 10580.88 7564.83 7500,00 45 20 10724.35 7664.83 7600.00 46 17 10869.94 7764.83 7700.00 46 59 11017.43 7864.83 7800.00 47 41 N 46 40 W 5828.91 N 46 41 W 5940.81 N 46 14 W 6047.86 N 45 58 W 6150.54 N 45 54 W 6250.30 N 45 47 W 6349.58 N 45 53 W 6449.72 N 45 58 W 6552.60 N 45 38 W 6658.40 N 45 4 W 6766.82 1 18 1 06 0 99 0 85 0 45 0 47 0 59 051 0 75 0 6O 4025 72 N 4216.21 W 5829.48 N 46 19 W 4102 48 N 4297.67 W 5941.41 N 46 20 W 4176 26 N 4375.25 W 6048.47 N 46 20 W 4247 50 N 4449.20 W 6151.15 N 46 20 W 4316 93 N 4520.84 W 6250.91 N 46 19 W 4386,21 N 4591.96 W 6350.19 N 46 19 W 4456.03 N 4663.74 W 6450.33 N 46 18 W 4527.57 N 4737.68 W 6553.20 N 46 18 W 4601.29 N 4813.57 W 6659.01 N 46 17 W 4677.58 N 4890.61 W 6767.41 N 46 17 W COMPUTATZON DATE: 19-0CT-91 PAGE 8 BP EXPLORATION F - 48 (22-34-12-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 26-SEP-91 KELLY BUSHING ELEVATION: 64.83 FT ENGINEER: JACK RATHERT INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 11167.09 7964 83 7900.00 48 26 11317.60 8064 11468.22 8164 11617.58 8264 11765.48 8364 11913.44 8464 12060.93 8564 12208.74 8664 12356.28 8764 12504.02 8864 83 BO00.O0 48 22 N 45 22 W 6990 83 8100.00 48 21 N 44 51 W 7103 83 8200 O0 47 37 N 43 44 W 7214 83 8300 O0 47 28 N 43 12 W 7323 83 8400 O0 47 22 N 43 2 W 7432 83 8500 O0 47 19 N 42 45 W 7540 83 8600 O0 47 16 N 41 29 ~' 7649 83 8700 O0 47 26 N 40 28 W 7757 83 8800 O0 47 49 N 39 36 W 7865 N 45 6 W 6878 16 65 28 19 09 04 33 O0 37 0 18 4756.30 N 4969 35 W 6878 73 N 46 15 W 05 4835.50 N 5049 85 4914.85 N 5129 65 4994 25 N 520'6 83 5073 56 N 5281 42 5153 19 N 5355 81 5232 51N 5429 18 5313 16 N 5502 62 5394 99 N 5574 5478 44 N 5643 24 W 6991 17 W 7103 65 W 7214 39 W 7323 89 W 7432 78 W 7540 89 ~ 7649 09 W 7757 83 W 7865 20 N 46 14 W 81 N 46 13 W 69 N 46 12 W 53 N 46 9 W 42 N 46 6 W 67 N 4~ 4 4' 2~ h 46, C1W 35 N 45 56 ~' 12653.86 8964.83 8900.00 48 9 N 39 20 W 7976.32 12804,65 9064.83 9000.00 48 43 N 39 27 W 8088.53 12957.03 9164.83 9100.00 49 14 N 38 56 W 8202.78 13110.41 9264.83 9200.00 49 17 N 38 45 W 8318.21 13175.00 9306.97 9242.14 49 17 N 38 45 W 8366.82 0.96 0.42 3.01 0.00 0.00 5564.63 N 5714.70 W 7976.40 N 45 46 W 5651.92 N 5786.23 W 8088.56 N 45 40 W 5741.12 N 5858.77 W 8202.79 N 45 35 W 5831.68 N 5931.62 W 8318.21 N 45 29 W 5869.86 N 5962.26 W 8366.83 N 45 27 W DIRECTIONAL SURVEY COMPANY BP EXPLORATION F"=LD PRUDHOE BAY F - 48 (22-34-12-13) COUNTRY USA RUN ONE DATE LOGGED 26 - SEP - 91 DEPTH UNIT FEET REFERENCE 74967 WELL' F-48(22-34-12-13) (1914'SNL,2826'WEL,SEC 2,T11N,R13E) HORIZONTAL PROJECTION 7OOO · ..i--~---i---~ ..... i---i---i.--~ ...... ~-.-i---~---~ ....... i..-[--~---i ...... ~--.i--i.--! ...... i---~--.i---i ...... i---~---~---~ ..... !---i---i---i ...... ~---~.--i---i-..' ....................... ,..:...:...:,~.: ...... :...:...:...: ...... :...:...:.,.: ...... :...:...~...: ...... :...:...:,.,: ......... :...:...: ..... :...:...:...:... ;::: ~;:: ::;: ;::: ;::: :;:. :::: :::: :;:: :::: :::: :::: :::: ~::: :::: :::: "i'-!"'F"~ ..... ?"!'"F"! ...... F"!"'i'"~ ...... !'"!'"F"! ...... F"!'"F"! ...... F"!'"F"! ...... !'"!"'?'~ ..... F"??'! ..... F"F'?"i ...... ?F"!'"! ...... !'"Y"!'"! ...... ??'!"'~ ...... !'"Y"!'"! ...... F"F"!'"~ ..... !-?-?'i ...... .... :...~..: ..... :...:,..:...: ...... :...:._.:...: ....... :...;.,.;...: ...... ~..:...:...: ...... L..:..,:...: ...... :...:_.;...:.,J...:,..:...:...: .... L:..: ~- ; .... :...;.,.:...: ..... ;..,:...:.,.: ...... :...:...:...; ...... ;...L..:..,~ ..... :...:...:...: ..... :: ::: :;;: :::: :;:: .................... ................ : .................... ~:: :::: ::: .,:...:...~...; ..... :,..;,..:...~ ...... ~...:,..:...: ...... :...:...:...: ..... -:.--. ..... : .................. ~...;...: ..... : .... :~::~ = :: :: : : ............................ ~i.-~,~..i-..i...i-..i ...... Li...i...i ...... i...i.'._i-.i ...... LLL.i ...... LLL.i ..... i...L;...; ...... L;...LL[...L;...h ....... Li...L} ...... i...LLi ...... i...LL} ...... L.i...i...i ...... i...LL.i ...... LLLi ...... LLLL :~+~, ! ~ , ~ . :. ,.. .iii ::' ..... "F" ...... F'Fi'""'T"F'F'! ...... ( ...... i ........ i ...... i'"i ...... F'!'"F'i ...... i'"TF'~ ......... F'i"'~ ...... i'"!'"i'"i ....... F'F'i'"i ...... i"T"F'i ...... F'!"T"~ ...... i'"~"T"! ..... !'"~"T"~ ...... !"T"! ........ !-7'! .... 1 ...... i---~ ~---!.--i---i ..... ~--! ..... i ...... i ......... i ...... i---i ............ i--i ........ :---!---i---i---i ...... !--i--.i ......... i--i---i---~ ...... i...i-..i,..~ ..... L.i.-.L.L'...i...i...i.,.i ..... i...i...!...i.:..].i:..i:.:hlr. ?--i--! ..... h!':~ ...... !"'i"'h'i ...... {'"!'"~-'i ...... !'?'~'"i"-~'?i'"?"i ...... i"-hi'"i ...... !'"i"i'"i ...... i"'i'"i'"! ...... ~?-i---} ...... i"-i--'!'--i ..... i'"i-"i'"i ..... ~'"i'"?"i"'!"i'-'i'"} ...... hl-'!-'i ..... · ::i::i:::i:::i:::::i:::i::i::i::::::i:::i:::!:::i: =======================================================::~:::~:::~:::~::.:::~:::~:::!:::!:::~:::!::~:::~:::~:: :::::::::::::::::::::::::iiiii!{ii!ii :iJi!i!iJJ!!JiliJ!!JiJiJ!ii ii!!i i! !ii ii [!!!J I -'?~i"i'"! ..... i"'!"i'"i ..... h'?'i ..... ?'i'-'?i ...... h'i---?i---i'--i--i---!'-i ...... ?-i?i ...... i'"?'-i"i ....... 7"-?-i ...... ?'""i'"i ...... ?'i ............ '"'??'i"~:'''' ...... i ......... i ...... ?--' ...... i ...... i ........ ""i'"i ...... ~T!"T"i ...... !"T"F'! ...... !TF'!"TT'-F!'"?! ...... i'"!'"Fi'"i'"FT"F'i ...... !'"F'F'! ...... F'!'"!'"!'"~'"'F'F'!'-'~ ..... ~'"F'~'"Fr'F'F'F'F'r';"F'F'~ ...... F'i'"!"~ ...... !"T"F'~ ..... FT"FT" ~.~i...L..i ...... i.4...L-i ...... i--.L.i-4 ..... i..-L..i..-i ...... i...L.L.i...!-.-i.-.i...~..-; ..... i-..i-..i-..i ...... hL.i-..i ...... ~..L.i.~...}~ ...... } ......... } ...... L.L.L.} ...... i ...... i...iii...} ...... ...... ...... iL;.4...i ........... ,..L~L..L..[ ..... L..!...L..[ ...... L..L..L.4 ..... L..L.]_.[ ...... L..L..L..i...I...L..L..L..~ ..... L..L..L..[ ...... L..L..L..[ ...... L..L..L_[ ..... :.:...i...[ ...... [..!...L..[ .... i...L..i.[ ...... L..L..L..[ ...... L..i...L..~ ...... L..L..i...i ..... ~ ..... [ .... · .!...i...i~.-i ...... i...i.-.i..-i ...... i...i-..L-! ...... L.i.-.i--i ...... L-i..-L.i ..... i..-L-}-..i ..... L.14---i ...... i.--L.i...i ...... L.i..-i.-i ...... i.~-.-i ...... L.i...i..-L.:...L.i...i...;...:...i.-.i.-.i...; ...... i...i...L.i ...... i...i...L.i ..... i.-.i...i...i... ~¢?i'--i ...... i-'-i'-i--i ...... i---i-'-!-1 .... i.--!---!--! ...... !.--?-i---i ..... i'-i--'?'-! ..... h-~---i ...... hi'-'!-'i ...... !--i---!--?-'~:'--h!---i---! ....... i"-!--i---i ...... !"-i-"i'-i ...... i"-i--'hi ...... i"-i---i'--i ..... i'-'i-"h!-'- ..~..~...~...~ ...... ~.~.~..~...~ ...... ~...:...~...~ ..... ..... ...... ..... ...... ~......~ ...... ._.. ...... ..... ...... ~...~.......,...~_.....~ ...... :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ~-i-.-i---i ...... i---i...i..-i ...... i.-.i..-!-.-i ..... i---i...i-.-i ..... i---i---Li ...... i--.i.-!---i ...... i-.-i...i---i ...... LL-i...i ...... Li...i.-i ..... Li...i...!...:...L.i...i...i...'..'i...~i...i..-i...i ...... i...i...i...i ..... i...?...i ...... ~...~...i...~... ................................................................ .................................................................. '-~-F'F'[ ...... F'F'F'[ ..... F"Fi'"! ..... F'FT'T":"T'T"F"i ...... i'"F'F'i ..... F'i"'!'"[ ..... i"T"i"'i'":"T"F'F-[ ..... i"'F"F"i ...... FT'T"F":"T"F"FT"i"T"F'!'"i ...... i"'F'i"'~ ...... F'i"'F'[ ...... FT"F'F' ..... :::: ;;:: ~::: :::: :::: :Il: :::: :::: :::: :::: :::: :::: :::: :::: --i--!'--i'--}---,---i"i--'?--~ ..... i--i'--h-i ..... i---h-i---~ ....... i---hi---! ...... !--i--i---~ ..... i---!'--i--i ...... h-!---Pi--':-'i-'-!-'-!--! ...... i-i--i"i ...... k-i'-'i--i ..... !'-i--i-'i ..... i-'i--i-"! ...... !"-!--i--i ...... i-d-i--! ....... WELL' F-48 (22-34-12-13) (1914'SNL,2826'WEL,SEC 2,T11N,R13E) VERTICAL PROJECTION ................................................................................................................... :...:...:...: ..... :...:...:...~ ...... :.,.:...:...: ...... :...:...:.,.:... '-?"?'~'"?'q'-!'"!"'?~ ..... F'?"?! ..... ~'"??'F- :::: :::: .... :::: :;~ ::::,:::: :::: :::: :~:: :~:: :::: '"FT'I"'! ...... i"T"FT": ....... ' ---}-.-H.--i--.i--!.--}---i--.i ...... !---i ...... i ....... i.--}--.i ..... ~---i---i--~i---i ...... i-.-hl .............. i ......... i-.i.--?i---i--i.-i--i-'i ...... i--?-i--i--.?i--i.-.~ ...... ~":~":i::'!]:":i'%i:%:::i:::h:!]]]L:::i: · --i--'i"i ..... ~--i'-!--'F-~ ...... !---?F-~ ..... i'--F'~--~ ..... !"T"!'"!'"~]".,,~m~'E]"'!']E ZE]]]] Z]] i [ El]]~]]I]]]]]]Z] ]Z]. Z]]]]]i] E]E]]Z]] ]]E.E.i..]_. ].[..i...i...!] ..... i...i]..i...! ....... i...i...L.~... :::i:::}:::i:::::: :::}:::}:::}:::i:: ::::::::::::::::::::::: ''? ...... ...... hi'"}'"} ...... ?"!"'!'"}'i'"'!'"?"71 ...... ~.~...~!.L.~ ..... L.L.L.~ ...... L.L.~:...~...L.L.i ...... !-.-i---L.i.Z~%.~ ...... i---i ...... i ...... }---i ......... : ...... !-'-hi ..... i ...... }--'! ....... }---i-'-}---} ...... i-'-i"-i-"i ......... i--'i ................ ]]]i[]~]i].!...[]i].L.i..i...i...i...i...! ...... i...i...~..[...i...i...i._.i ....... i...i-..i...~ ...... ~ ..... ~---i ...... !--~---~--~i ...... ~-..~.--!--.~ ...... ~-.+-+--? ..... ~-.-~.-+--? ....... ~-.+-.~.--~ ...... ~---i.-+..~ ..... ~--+.-!--~ ...... ~-.-~-.+-.~ ...... ~"i"i-i'" : :i:::i::i :::::::::::::::::::::: :::[:::j::i:::i::: :: :::i::: :::i:::i:::i:::J::: ::: :::::::::::::::::::::::::: ::i:::i:::i:::i::: ;:::i:::i:::i:::i::: :::i:::i:::i:::i::: :::i:::i:::i::: ::: :::i:::i::!::: :::i::: ::: ::: !!ill'ii ii;: ~,..!...i,.L..i ...... L..i__.L..i ...... L..i..,L..! ..... i_. ,L,:: ..... ~.i...!...i..i ...... L..L..L..i ...... ~...i...i...i ...... !-.-~--.i---i ...... i--.i--.i.--i-.-...i-.-i-..~--.i-..!.--i.--i--.i..-i--- ::::::::::::::::::::::::::::::::::: :::i:::i::i:::i::: :::!:::i::i~:: :--!'-'i:-i--'! ...... }'"i:"i:::i": :::i:::i:::(:::(:::~~:i:::!?:::~ ::::::::::::::::::::::::::::::: :::i:::!:::i:::i:::l:::::::::::::::::::::::::::::::::::::: ;];i;]i;;;::;i::; :]!;:; :;; ;]:~; ;;;iZiZi;;;;:; Z Zi;]~] ;;;i]~;i;]; ;;; ZiZi-]L.i;;....;..-i...i...i ....... i-.i..-i...i....-~...~o.i-..i...i .... !---i---i-..i-..I.--i-..i.--!.-.i ...... i ...... i ........................ i-.,i--.i.-.i ..... i...i...!-.i-.. ...~...~..:~...~...I.]...~...~...~ ..... i.]..]...L'...;.]...~_.._~...%~.; ...... i...LLi ...... ;...(...i._i ...... LL~...L ~,%...i...i._i...( .... i...i...i...LL.i...i...Li i.~i...L.i ..... Li...i...i...'...i...;...L.; ...... : ~ : : : i ! i : ~ ! ! ! ~ ~ ! ! } ~ i i ! ! ! ~ ,N,,,~;..:..~1~,4,~ ~: : : : : : : :..:.i...~ ..... :...:...:...: ...... :...:...:...; .... : -..}---:-,4---~ ...... }.-.:...:--: ..... !---:---:---: ...... :--.:---:---: ...... ~---:---:---: ......... ~ ...... ~ ...... ?-?'F"?""?'?'?~'"?~'-'?! ....... ?__.ry'?"!'"~ ...... F"F"!'"~ ...... !?':: :::: :::: ...... i'.-i--i---I--i.-i---i-'-i ...... !.-.i ............... i---~-..--i--i---i--i ...... i---ri--.~ ...... i--i---!.-i ..... ?i":i i ::i !" !: '~: :~::i:~ !::: i:::!::!::!::::: i :i !: i i ::! :i:::i::: '"i"T"FT"I"i ...... ~"'~ ..... i ...... i"i ...... !"T"~:"r'"i ..... FT"!'"F'!"'!'"~ ...... F"i'"i'"i .... Fi"~'i'" ~ ~"! ! ~ ~, i ~ ~L i ~ ~ ~ i ! ! ~ i ~ ~ ~:::~ ~ ~ ~ ~ ~ ! ~ ~ ~ ~ ~ i ,i~ .~ ..... ~ ..... i .... i. .i ....... L..i ...L. ~ i I ~ ~ ! ~ i ~ ~ ~ i ~ , ~ i ! .i i.~ ~...L.i ..... L.i...L..L.....L..~._L.~ ....~ __~ ..... ~...i .... ~. -L~ ...L..L-.i...i ...... i .......................................... '"q'iTE;i?;]E]EE;E;:;i ;ii]i ]i ..] ........ L.i...i...~ i_.L.i...! ...... L.i...!...! ...L.~_.!.~;:]~i ............................................... i ...... ~-.-!.--i--- i!!!~.i.~..!...! ..... !...L..!...i ...... i...i...i...i ...... L..!_..L_i ...... !._.~.,.L.,! ...... L..L..!...~...L.L..L..! ...... L..i...i._i.. ...... ,, .,,. :::: ~::::::~ :::: .... ..-:...~..-,-.., ..... ~...,...,-.~ ...... ,..-:...:...: .... ,...,...,--.~ ..... ~.--i-.~---~ ...... ~---!-.+--~ ...... ~---~--.i.--~ ...... ~--~--+--~ ...... ~--.~--.~---~ ..... ~--+-+.-~ ...... ~..+-+--~ ...... i"i"i'"i"i'-!"i"i ...... ::;~ ::::,~::: ::;: ..................... "!'"!'T"! ..... !"T'T"! ...... !"'F'!"T .... i'T'T"i ..... ~-.,---i---!-..?:-i ...... ?'!--~ ...... !-'!"'!'"i ...... i'"!'"!'"i"-!'"!'i'"!'"'-'i"?'"!'"i ...... !'"!'"?'"h?"i'"~,,:, ..... ,,,:?"?"r~ ...... :,??i ...... ..... ?%.-!- ..-i.--i.--i.--i ..... ~.--i---i.--i ...... i---i--.i--.i ..... ~---~--+--i ...... ~..-i-.+.-~ ....... ~.-+--~.--i-..~.--~.-.~--! ...... ~-+-.~---~ i"i"i"i ..... !"i'-i'"! ...... !"i"i'"! ...... !-'-i"i"-~ ...... i'--i-'i--i ..... i--'i"i'-'! ...... i-'i-i-i ...... · -i.--i-.-i--.i ..... i-.-i-.-i-i ...... i..-i.--i-.4 ...... ~..4..4...i ..... i.--~-.~---~.'-.~---i-.-~---~ ...... i.-.i...i.-i...i--i--.i-.-i ..... ~.-.i.-.i-.-~ ..... i--+--~-.-~ ~'-+-+-'~ ...... ~-'+"~"'~'"!'"i'"i"i ..... i'"!"i"i"i'"!"i'"i ...... !-'i°-i-!' · ?'r?"~ ..... !'-'??'~"-~'"~-'?~ ...... ?"?"~ .... ?!"'?"~.... !-"~'"i'"! ...... i--i---~--i-"~-'r"r'~ ...... ?!'"!'"~'"!'"!'"!"'! "'! ...... ! ........................ i"?'i'"i ...... ??"i'"i ...... · "i'"i'-i"i ..... ~'"~"'~-'~ ...... ~.--i--.~-.-~ ~---~---~---~ ..... ~---~-~-'-~-'!---i"i"i ...... i"i"i'-i ...... i-i'"i'"! i"T'T"f ..... F'!'"i'"i-'r"r"?! ...... ???~'"i'"f'"F'~ ..... F'!'"F'~ ...... FT'T'i .... :i:~ :':' ~i!~ !!i! i!!! ....... ~ ............ ,,-, , ....... :::: !iii ::::,:::: :~:~ !i~i ii!i ;~:: ii~ ::~: iii! !ill ............ ...L..i...L..i.., ...,...:...:...: ..... ,...,...,..., ...... :...,...,...: ...... ,..~...,...: .... !...~_.~...! ..... i...r..?~ ..... r-.~...?~ ..... !_!..i...~ ..... !...!...!...! ...!..i.-i...! ..... !.-!...? ...... ?..?..~...~ ..-!...!..i..-i ...... i..i...i...i ...... !...!.-i-i .... ,,., ::~: ;::: ................ ..-i---i.-.~--.~ ..... i.-.i.--i-.i ...... i.--i...i..-i-.-~..-~--+--~ ..... ,'","':'":'"!'"i'"!'"! ........................... ' .............. ~'"!"+"~ ...... ~'"~'-~'"~ ..... ~"+'+"~ ...... !'"~"+"~ ...... i'"i"i'"i ..... i"i"i"i ...... !-i-i-i ...... ...i...i-..i...! ..... !.--i..-i--.~ ...... ~...h-.~-..i ...... i..~...i...i ..... ~---~...i---~ ..... ~-.-~--+.-~ ...... i--i--~--! ...... i-i---i--i ...... i--~i-'-!---! .... i'-i---i--i ..... i--'!--i-'-! ...... ~.-.i.-i--i--.'--i'-i'-i-'i ..... i-'i-'-!--i ...... i-i-i-! ...... '"i"!"i"'! ..... !'"!"'!"'! ..... !"!'"!"i ....... !'"!"'!"i .... ........................ ...... ...... .... ..... !'"i'"!'"! .... !'"i"i'"! ...... !-!"'!-'! ..... ::;: :::: :::: :::: ::::,:::: ;::: ::;: ........................ .--,.--,...,---, ...... .-?--,-..,..-,.--,-.-,---: ...... ,-.-,-.-,---, ..... ,---,---,---, ...... ,---,---,--., ...... ,---,-.-, ...... ???!'"i'"!'"i"'i ..... !"i'"i"i ...... i---i-.i---!'.'!-"!'-'!'--!'"i'"!'"!'"!".'i'"i'"!"i .............. ....... ~-'~ ...... iii~ iiii--.:---iiii ............... ............ :~: ............. ,'","',"-,'" ,"','",-~ ........... ii'"i'"! ............................................................................................... ~..+--i.-i-..~.--~...i..-i .... i-..,.--i.-.i-.. .................... :...~.:...:.., , ........... ---~--.~---~.-.~-- :::~ :;:: :::: ;::; .... ...i..-i-..i...i ..... i..-i-..i.-.i ...... i.--i...i---i .... i...i.-.i--.i ...... i.--i...i.--i ....... L..i...L..i ...... L..L..L_~ ..... ~--~--.i...~ ...... ~.--~---~..-~ ..... ~---~.--}---~ ....... !-'+.+"~ ..... ~'"~"+--~ ...... ~-'~'"~'">'"!'"!'"!'"! ....... i-i-i-i ..... i--fi-i- .................... :::: ii!! :::: ::~: :::: :::: ::;: :::: ............ :::: :~:: :::: :::: :::: :::: ;::;...:-.:...:...: ...... :-..:...:...; ..... ~...:.-:...~ ...... ;-..:.--~.--: ...... :-.-:.--:,..; ...... ;---:---:---: ...... ~-.-~,--}--.i ...... ~.,-~--.~-,.~ ...... !-"!-"~---~" '"???~'"'-?~"'?'~ ..... ~"?"!'"~ .... ~'"!'"i'"!'-,"'~'"i"'i'"~ ..... !'"!'"F"~ ...... ?F"F-~'" : : : : : : ~ : : : : : ~ ~ ! ~ ~ ~ ~ ! ~ ~ ~ i : : : : : ~ · ~ ..:...:...:...: ..... ~...;...:_~; ..... :...L..~...~ ........................ ~--.:.--~.--, ...... ~-.-i---i-.-! ...... ~--.~---¥-~ ...... i-.-~...i---~ ..... ~---i---~---~ ..... h.-i--}--.~ ....... !'"F'?"! ...... !'"!'"!'"! ...... ?"?"!'"! ...... !'"!'"!'"~ ...... F-Y-F"! ..... ;;;;~:::; :;:; ;::: ................ :::: ;:::, ........ · ..~...~...~-.?.-~-..~...~...~ ...... ~.--~...~...~ ...... i-..}.-.i.--~.--~---~-+-.~ ..... ~...~---~-.-~ ...... ~--+--~--~ ...... ~--i---i.-.~ ...... ~-.-?..?~ ..... ~-..~.-~---~ ...... r"??"~ ...... ?~---?-?'--!'--i---!-'-i ...... !"i"i'"! ...... ..... :::: ............ · .-!--.!.-.!---~ ..... ~--i--~-.! ...... i..i...~...~..~...~..~...~.,.~.-;...}--}-}...}-..L.i.-.i.,.i ........ ...... i---;---i--i---~--~---~-.i..i--.??i ..... ?-?"?"!"'?'i"i'"i ...... i"i"i'"~ ...... ?i'"i ...... }"'!'"!'"} ..... !'-}-'i-'} ...... · --F-'i--4.--i ..... i--.i-.4--i ....... i--4---}-.-i ....... i-..i..-i.-,i ..... ~-.-i---i---i ...... !-.4.--}--.i ...... i--.i--4--i ...... !"'!"'i'"i .... !'"F"i'"~ ..... F"!'-F"! .... ???"! ...... !"'?'!"?'"!'"!'"?'! ..... i'"F"i'"! ...... !'"i"'~"'!'"i'"i'"i"'~'" --i---!---}---i ..... i-.-i-..i...i--.:.--F-i--+.-i ....... i.-4---i..-i ..... i.--i--i-.-i ..... i-.-i.--i---i ...... i--.i---i--i ...... ~-.-~--.h-~ ...... ~---~-.-~---f ..... h-~--~,-i ....... h!'"!'"i ...... ?"?"?i ...... ?-i'"h'i ...... i'"i'"hi ...... F'f'"F'~ ...... "i"i"i"'i .... i"i"i"i ...... ~""'"'"" ....... ~'"'"+'" ...... ~"+'""'~ ...... ~'-~"+"' ...... ~"+'""~'"~"~"'~'"~ ...... '"+'""'~ .... ~"+-'"" ...... i'?"T"i ...... ?~'"~'"~ ...... !"i'"!'"!""'"!'"!"T"! ...... i'"!'"i"'i ..... ~'";"T"~'" ........ :~,. ::~: :::; :::; ;::: · -~-..i..~-.-i ..... i.-.i.--i-.-~ ...... i...~...~...i ....... ~..-~--+.-~ ...... ~--+--!---~ ...... ~..-~.-+-.? ...... ~--+.-~--~ ...... ~-.i.--i...i ...... i...~..-i...i ..... }'"}'-i'"i'":"'}'"i"'}'"i ...... i"i"i"i ...... i'-i"i'"i"i"i"i"i ....... i'-i-!-i .... hi-f! :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ........................... ..................................................... ::::::::::::::::::::::::::::::::::::: : ?'i"'i'"i ...... ?i'"!'"!"?"?Y-! ...... ??"?! ...... ~ ...... ; ........ ~'"!'-~'"!'"'"'i"'~ ............. ii !iii !ii! .... ~-!"i-'i ...... V'i"i"i ...... ~ .......... ~ ...... ~-'~"+'~ ...... ~'":'"}'"' ...... '""-:'"' ...... '""'""'" ...... '"'"":'"' ...... "-'"':"" ...... '"':'"'"'" PRC~ECTIONONVERllC,KL. PI.,4NE t~4. o0 3~4,O0 ~?.ALE~',iVE~TIC,N.,DEPTt'~ HO4:~IZGCAi.,E- I / ~ ~ BP EXPLORATION PAD F (22-34-12-13) F48 Controlled Drilling LES HENDERSON (907) 333-1552 Consultants, Inc. CONTItOLLED DRILLING CONSULTANTS, INC. P.O. Box 190560 Anchorage, Alaska 99519-0560 (907) 333-1552 July 25,1991 Mr. Larry Driscoll BP Exploration Pouch 196612 Anchorage, Ak. 99519-6612 / RE: Magnetic Single Shot Job No.A-0791-OlO Well:F-48 (22-34-12-13) Prudhoe Bay Field North Slope, Alaska Date of Survey: 7-10-91 to 7-25-91 Dear Mr. DriscOll· Please find enclosed the" Original" and four (4+ copies of our Magnetic Single Shot Survey on'the above well. The method used in calculating this survey was Radius of Curvature. The depth of the survey was 434' to 12,279'. Thank you for giving us this opportunity to be of service. Yours very truly, Controlled Drilling Consultants, Inc. Directional Supervisor E A S ........ D R I.¢-T. _._V.EP~ T.Z C R L EPTH ANGLE D~,P TH D ........ · 964 ~ ....... 6 9G4, i 469 0.---54 ..... ~-4 68,9 F i604 ~ 6 168~., ~97 .... 5--48 ~ 696, 2072.t7 ~O . 2862,50 2~53 ,-:. ~4 42 2322,27 ~448 2~--~ 2408 2636 28 42 2574,24 Z715 3~.t8 264~,25 2-796 32 54 2711 ,87 ~984 ;!8 6 2865, 06 ~i62 42 i,..° ~OOJ,, ,28 ;267 44 ~O 3074,72 ~,E'OORO OF SURVEY JOE', NO WELL K9 Ei.,E9 64,83 FT, PROP:OSED D I REC 't 404,14 S88, 'OOE J 539,85 H6.7, OOW 't 631 , 76 N42', 40Y ,' z 4 2 N 44,2 ,¢ t 907,54 H39,3OW '" 086, :~i ~;~ ,~. :: 2~ 8,04 H44,2'u ,,~"' 2347,57 N4 i, 7OW 2 5 i. 0 ,0 i ~'~ 34 , ",. Oki 2578,42 H3~S, ! OW 2800,23 N4~,5OW -c-~ ,45 .... 8Ok~ 7 089,89 N4.7, O OW t CTRL COL~,,-; !N:~TEo D i :,T r4NL. E ......... ~ E 5 , ~ i 7t E 2 ~,. "~ 05 N 4 I~ 0 4 :i0 :" 2'.:i 4 O, O 6 N ..~ 9 , 4 '":' ,k~' 56 59 oi N 57 41 b~ 82 G:i.,54 N 79,83 ~.~ ti,! 106,74 N i05,,.,~9. W i50 i64.,27 N I68,08 iO 229 i97, ~7 N 187,83 ~J 272 .... :,2,'Z~ N :~i4 30 i,.~ 316 ', 299 65 N ~'¢:'~ ' . 7.4i, 17 N 2'::;5,07 ~,; 45! -;,o.:~ E:E, N 332 68 ~;: 5;::7 423,75 N 572..96 i~i 5~64 · ,,:..:.,, e. 5 N 4 i 3, ~F [:.¢ ~,~--o i 5;i O 9:4 H ""4 -"" " 690 S U R E,' 0 , P, t,~£t...L F-4.8 TR~UE E.AS ,. DRIE'f . VERTICAL .EP TH. ~ H.~L~ b EP 'T ~4S2 49 ~45. 4 55 .38 382 ~, 5 t36 56 54 t-1 54 54, 4335, 5695 6-06Z.,-52 ...... ~ 4728. 62.49.. ~528 68~2~54 .....I8 519~,91 7191 7475 55 54 55~6, 7667 8{40 53_A..8 5952, 8328 52 42 93~4 50 24 9659 9839~48 .6 6308 34 672 0 28 69 04 ! 2 7028,48 7222,02 3257 ,, 56 4 ! ~ 4,72 427 O ~437,4 O 4778,7~ 4956., 5127,88 ':501~' , 23 5~09, 5774,77 ~888,06 6081 ,20 6235 6474,8t ~ 839,29 6963,65 7 ~ ~¢ 7 , i 9 ':~ ;f :N G L. E S F~ 0 T S U R: V E ~' REL, O. Rg, OF :,UR'7=Y.. DR ~: FT b I REC 't'OTRL COOf;.:D IHR"FES' N47, $St~l 605., 32 N 5e27 N48,50~¢ ~216,40 N 1242 N48,.00~ ~5~9,I~ N !588 N45,40~¢ 2022,4,~ N 2~46 ~,f4.3,60k~ 2274,3t N 2398 N42,7Ot¢ 2439,77 N 255~ N42.,8018 2~68,57 N 2765 N42,70~ 2S~!,67 N 2925 N44 , 20tJ 2956 , 6'i N 3033 N42.90i¢ L~123,27 N 3':i92 H4;~, 2 Otd :~22:4 , 7~, N ~,.~.. ~, N42,90t~t 3344,45 N 3399 N47,~Ohf 3452,57 N 3499 N43,4.0tJ 3558.12 N 3599 H43,60[~ :$769,44 N 3799 N45 , 90k~ 3': "~ 395 .¢. .... 06 N 3 H45,20~,.cl ~078,48 H 4!I0 H45, OOg ~178,94 fq R44,90d 4325.05 N 4357 2424,31 H 4,6 £;~ 2654,05 N 46 40 2949,52 l',..1 46 4.2 40 3090,21 N 46 39 21 3305,34 N 46 3I 20 353t,76 N 46 18 20 l,,~ 384.2,79 N 46 ~ 4236 34 N 45 4.4 24 4466 tS N 45 37 38 46~8 52 N 45 72 31 4768 52 N 45 27 4916 506.! 5.-4=,., 5571 6139 ;) E 2 ./'[ 0 (I F:' T I , 5,;; I ,660 ,, 696 ,374 , ~45 , ,67 0 , 9 O 7 ,4:36 ......... TRUE ,EPTN ANGLE DE, PTH · 0~,4. 44 742~. 72 ..0.~379 46 3~ ..... 7~2,, -I155 ,18.42 7~5,9 .t62~--..47 ..... ~ 8247,4 22.79 47. 2.4 8689,62 OTTOH. HOLE CLOSURE RECUR[ OF:' SUR'VE'V SUB DRIFT SEA DIREC '¢$55,89 I444,58(¢ 4467,2E~ N 4497,'76 W ;"871,07 N4~,CO~,~ 4868,72 N 4876~66 W 8182,57 N42,SOW 5t~4,44 N 5!16,68 W 8;~78,34 N42, tOW 5266,70 N 5255.96 8497,66 N4~ ,7GW 5370.67 N 5~49,24 :44 48 24 W C L 0 S U R E S 6687,60 7026:36 N 45 :S 53 W 7234,49 N' 45 O 45 t~¢ 7580,i3 N 44 ":"o.:, .... -'~" W 7718,22 N 44. 48 24 ~,~ D i S TA t"t C E S ~:.~. 07", ,. 7 ,] :2, 6: '~ O 758 0, O;3 ........ TRUE MEASURED VERTICAL,, .DE~.~H DEPTH i 4,~5 2074 218 t,. ~2.8 9 25 t i 2G~5 2?4.0 3249 '"',,,"E R Y ,...,;.. T 0 F S ,U B H b.- T VD ¥ E R T ~' C ¢:~ L SEA ~ t FFt'ZRENC:E COFcRE,$T i ON 300 'I 865, I 008 i~6~, I600 O t 765, 17 ~ 0 0 2165, 21 00 2265 , 2280 2465, 2400 46 25~5, 2508 59 2765. ¢~700 94 20~5 . 2~:00 ~165, 3i 60 230 .~365. 3300 350 3465 , 3480 4'f 7 0 g 8 O 2 4 ';9 24 i, 23 2 2~ 4., G7 5,33 ,22 ,29 .74 ,27 20 60 85 115 14.,cj IO6 656 S $ S $ N N N N N H 64 o-;: F T I o P, ,':':iLL F-48 MEAS;U.RED ...... 4w0.5~ 4 ;39_t ........... 45.6..8 4:?5-8 ...... 5 i.. i..~ 52~7 54~.2 56 5;~99 ~.S3.~ . -7-294- 74_73 765.0 7~23 7S~92 .... ..... 816(~ .... 8489 ...... 8~47 8805 89 6 "' . g~7. 94~4 9589. . .3565 3~,65, 3600 554 ~ ~5, 3790 626 ggGs, ~<'.'90 O 785 4065, 4000 865 ,4 i ~,5, 4i O0 42~5, 420a 1 022 4465, 4400 i I67 45E, 5. 4500 4765, 4700 i S6i 48~c, ,. 4800 i416 4965,. 4900 t473 5,3~5, 5300 ~ 749 5465, 5400 556~., =~00~. I907 ~665 ~" _ ..m ~ ~e, nO ) 984 5765, 5?50 2058 ~86~=... . 5800 2 i 27 ..... .,. Ou 2~ 95 )~,~6~., 620n. 6365 6300 "~4:'a ~465, 6400 ,S565, 6500 2554 A665. ~.600 2612 E..86~, 6800 27'24 69~5, 6900 2778 i 0 O F E E T 0 F V EP, T I C i:,~ L CORRECTION 68 7'2. 77 82 80 79 78 74 7t 64 55 57 72 77 66 59 ~7 54 S U:'B S E A b E P t"H, i,r=, EL, EU P, ~,:IEL. L F-48 [¢.SURED OEPTI,t ¢4N90'THE~,~ i.',,,¢iT~l F3(;i', EVERY EVEN ~0(~ FEET OK SOil: SE~ 9EPTH, TRUE ME.K~SURE~. YER"F i CtqL SU~ MD--TYD VER'F IC~L C. OP, PU'T E R .... K B E L E; Y t_0.~.48 7165 , O i 83 7265, ~..932.5 ...... 7365, 84..6~. ;¢465, 8.6.09 7565 , 0753 7665, 0~9.9 7765, _t 19.9 7~65 , !_i 9.4~_ 8465 22.42 8665 22.Z :~ 86~ O 7i O0 2*374 46 42S3, 7280 29'i8 44 7700 2960 42 7408 3001 7500 3044 4~ 4571,46 7680 S088 44 4646,30 N 467'I 7800 ~'18~ 49 9 OOO 3285 52 4966 8200 3384 49 5i28,48 N 8600 ;;577 49 5455, 8625 5589 .:.~ l NGL, E HO T .... d 0 8 N 0 ~l- 0',7 9 t ,- '3 'i 0 64, S ,'!: F' T, :N'TERPO.LATED .VALUE:S FOR EVE;",[ TRUE t',IE..A S U.RE.D VERTI CAL DEPT. H DEPTH 0 O. 1.00.0 i OOO,, 2000 ~.OOO 2878, 4.0.00 .. 50_00_. 4~ 84, 60 O O 4687, 70.80 ~ 0 O, ............ 8_000 ~869, 9.0 O,O. 6489, 1 2279 869 I 8 O0 FEET OF ?tEASURED DEPTH, 8U8 ~*E~ O'T~L OORD i ~,,,iATES -65 ,, 4622, 6424, 707~, 8436. 8625, 44,63 '"', c, ,~ 93 896,63 24,44: '~ t 2552 62 3152 68 :~ 7 :'.24 66 4262 76 4777 02 5475 97 AOGCC GEOLOGICAL iviATERIALS INYENTORY LiST PERMIT # d~ ~ - ~'~ WELL NAME pl~J. ,~"-"~ COMPLETION DATE ~ ! ~') !~l CO, CONTACT e~ ' 'chcc~ off or list data as it is rcceiYed.*list received date for 407', if not required list as 'NR cored inte~ais core anai~sis ~ d~,ditcb inte~als digilal data LoG TYPE RUN ' INTERVALS ' SCALE NO. [tq thc nearest foot} [inchll O0'l BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 10/02/91 T# 82885 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. L,~F-48 CET 09/26/91 #1 12300 13092 SCH CBT 09/26/91 #1 12300 13092 SCH PERF 09/27/91 #1 12100 13065 SCH Information Control Well Records Adrian J. Martin BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO Date:08/12/91 CH EVRON T#:82695 EXXON - MOBIL PHILLIPS TEXACO STATE OF ALASKA GEOSCIENCE ARCHIVES BP OPEN HOLE FINAL Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. F-48 BH SONIC 07/28/91 #1 12466-13128 HLS 5" F-48 DFL IND. 07/28/91 #1 12466-13166 HLS 5" F-48 DSN 07/28/91 #1 12466-13103 HLS 5" GEOS/ARCO/EXXON/ARCHIVES ONLY. F-48 SSTVD 07/28/91 #1 12466-13166 HLS STATE ONLY: Magnetic Single Shot Directional Survey Date: Gyroscopic Directional Date: Inforation Control Well Records LR 2-1 J. Dietz/A.Martin Job~: Job~: BP EXPLORATION BP Exploration (Alaska) Inc, 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO DATE:08/13/91 EXXON T#: 82704 PHILLIPS STATE OF ALASKA ARCHIVES SYSTEM Tape & Transmittal Only BP MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. F-48 HRI/CVL/DSN II 07/28/91 #1 H LS#L6662 i -5 1600B PI 12448-13204.5 TAPE POS.#07886 AP1#50-029-22187 Information Control Well Records LR 2-1 J. Dietz TO: THRU: FROM: MEMORANUUM State of Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION Lon ith DATE:- July 22, 1991 Commis s ioner FILE NO: LG722 - 1 Louis R. Grimaldi,~-~? Petroleum Inspector~ ~- TELEPHONE NO: SUBJECT: RIG/BOPE Inspection BPX F-48 Prudhoe Bay Field Permit Nee 91-86 JulY.2!, 199!: I performed a RIG/BOPE inspection on Nabor's rig #1SE drilling well #F-48 for BPX in the Prudhoe Bay Unit. I found the rig and surrounding area to be in good shape and all equipment on the rig to be in place and operating adequately. In summary: The RIG/BOPE inspection on Nabors 1SE revealed no non-compliances. Attachment. 02-00lA (Rev. 6/89) 20/11/MEMO1.PM3 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Walk-Thru Inspection Report OPERATION: Drlg ~t: Wkvr UIC Operator ~/' Permit Drlg contr ~g~/P~'~ ' Rig~ Location (gen'l)~O~ Well sign IN COMPLt~uNCE; yes no n/a A. DIVERTER 1.() () 2.() () 3.() () 4.() () 5.() () 6.() () 7.() () 9. () 10. : ( ) -11. ( ) 12. ( ) ~3. () 14. (x/~ ( ) 15.(~ () ~6. (Y~ ( ) 17. ~) ( ) 18. ~) ( ) 19. (>9 ( ) 20. '~) ( ) 21.(~ () 22. ('~ ( ) line sz & length line conn& anchored bifurcated & dwn wind 90° targeted turns vlvs: auto & simultaneous annular pack-off condition B. BOP STACK wellhead flg wkg press stack wkg press annular preventer pipe rams blind rams stack anchored chke/kill line sz DATE: Representati Well name 3:5. 34. 3.5. 36. 37, 38 4o. 41. (7¢~ ( ) 42. ("/X/.'.')( ) ~3. ¢~ ( ) 44. /~[]) ( ) 45. (/t ( ) () () ~4. (~) () 25. ~) ( ) 26 ( ) 27. (~ ( ) 28. (~ ( ) 29. ~ ( ) 30. ,~x~ ( ) 32. (,'~ 48.~ () 49. ( ) ( ) 90° turns targeted (chke & kill In) 46. ( ) HCR vlvs (c. hk~e & kill) /~g~ 47. ( ) manual vlvs (chke & k~---ill) D ( ) connections (flgd, whd, clmpd) ( ) drl spool ( ) flow nipple ( ) flow monitor ( ) control lines fire protected C. CLOSING UNITS ( ) wkg press ( ) fluid level 52. ( ) oprtg press 53. ~x~) ( ) press gauges ( ) sufficient vlvs 54. ( ) ( ) regulator bypass 55. ( ) 4-way vlvs (actuators) 56. ( ) ( ) blind handle cover ( ) ~ driller control panel 57. (). ( ) remote control panel 58. IN COMPLIANCE; yes n_~o n/a ( ) ( ) firewall ( ) ( ) nitrogen power source (back-up) ( ) ( ) condition (leaks, hoses, etc) D. MUD SYSTEM ( ) ( ) pit level floats installed ( ) ( ) flow rate sensors ( ) '( ) mud gas separator ( ) ( ) degasser ( ) ( ) separator bypass ( ) gas sensor ( ) chke In conn ( ) trip tank E. RIG FLOOR ( ) kelly cocks (upper,lower, IBOP) ( ) floor vlvs (dart vlv, ball vlv) ( ) kelly & floor vlv wrenches ( ) driller's console (flow monitor, flow rate indicator, pit level indicators, gauges) ( ) kill sheet up-to-date ( ) gas ~etection monitors ( ) hydr chke panel ( ) chke manifold F. MISC EQUIPMENT ( ) ( ) flare/vent 1-ine ( ) - ( ) 90° turns targeted (dwn strm choke Ins) so. (-~)-~ ( ) sl.C~ () reserve pit tankage personnel protective equip avail all drl site suprvs trained for procedures H2S probes rig housekeeping REMARKS: RECORDS: Date of last BOP inspection: ~-- ~ ~ Date of last BOP test: ~-/~-/-- ? / Resulting non-compliance: Non-compliances not corrected & why: Date corrections will be completed: BOP test & results properly entered on daily record? // Kill sheet current? C.0013 (rev 04/29/91) ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 June 26, 1991 R. Smith Prudhoe Bay Lead Engineer BP Exploration (Alaska) Inc. P. O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit F-48 BP Exploration (Alaska) Inc. Permit No. 91-86 Sur. Loc. 1914'SNL, 2862'WEL, Sec. 02, TllN, R13E Btmhole Loc. 1309'SNL, 3387'WEL, Sec. 34, T12N, R13E Dear Mr. Smith: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The Commission will advise you of those BOPE tests that it wishes to witness. ~a irman Alaska Oil~Gas Conservation Commission BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA . ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.005 la. Type of work Drill [] Redrill []llb. Type of well. Exploratoryl-] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI-II Service [] Development Gas [] SingleZone [] Multiple Zone[] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration KBE = 66'feet Prudhoe Bay Fie/d/Prudhoe 3. Address 16. Property Designation Bay Pooi P. 0. Box 196612. Anchoraae. Alaska 99519-6612 ADL 28278 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(s~e 2o AAC 25.025) 1914' SNL, 2862' WEL, SEC 02, T11N, R13E Prudhoe Bay Unit At top of productive interval 8. Well number Number 1500' SNL, 3200' WEL, SEC. 34, T12N, R13E F-48 (22-34-12-13) 2S100302630-277 At total depth 9. Approximate spud date Amount 1309'SNL, 3387' WEL, SEC, 34, T12N, R13E July 09, 1991 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(uDand'rVD) p rop~/~/_ line 28278 @ 1891' feet F-14 @ 1854'/21' feet 2560 13111 'MD/9210'TVD[eet 16. To be completed for deviated wells 17. Anticipated pressure (s~e 20 AAC 2s.o3s (e)(2)) Kickoff depth ~6oofeet Maximum hole angle 62 o Maximum surface 3330psig At total depth (TVD) 8800'/4,~90pslg 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 20" Cond. 80' Surface 110' 110' 17-1/2" 13-3/8" 68# L-80 Butt 2695' Surface 2725' 2681' 3790 cu fl Arcticset III & II 12-1/4" 9-5/8" 47# L-80 NSCC 12465' Surface 12495' 8831' !2755 cu fl Class G 8-1/2" 7" 26# NT,3C,.8oNSCC 866' 12245' 8677' 13111' 9210' 270 cu fl Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth ~tornUdC3clro~l R E C E IV E D Surface Intermediate JUN 2 1 t99t Production Liner Alaska Oi~ & 6as Cons. ~,umrnissio_n Perforation depth: measured ~nch.0.rag~. true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirementsF'l 21. I hereby certif~ ~ng is true and correct to the best of my knowledge [ I Signed Title PBU Lead En~Tineer {~ ?.,~ ~ Date Commission Use Only Permit Number IAPI number IApproval date See cover letter ~/-.:~ 150-~.->--<~--,~-Z/"~'~ I 0~/2,6/9~ for other requirements Conditions of approval Samples required [] Yes ~ Mud log requ~ed I-IYes~i~(No Hydrogen sulfide measures [] Yes ',~ No Directional survey requ~reo~ Yes E~ No Other:~ ~'.% ~b.~~~-,. .- by order of Approved by Commissioner zne commission Date f.~¢../~! Form 10-401 Rev. 12-1---85~.,~- Submit PROPOSED DRILLING AND COMPLETION PROGRAM WELL F-48 [22-34-12-13] PBU Install and cement 80' of 20" conductor to surface. The Drilling fluid program will consist of an 8.5 - 9.5 ppg spud mud in the 17- 1/2" hole, a 9.0 - 9.7 ppg water base mud in the 12-1/4" hole and a 8.5 ppg water based mud in the 8-1/2" hole. Drill 17-1/2" hole to 1600'. Kick-off and directionally drill to 13-3/8" casing point at 2725'MD. Run and cement 13-3/8" L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. A formation leak-off test will be performed 10' below the 13-3/8" shoe. Directionally drill 12-1/4" hole to the 9-5/8" casing point above the Sadlerochit Sandstone. Run a 9-5/8" combination string of 47# L-80 NSCC and 47# L-80 Mod. Butt. to within 10' of 12-1/4" TD and cement with Class G cement around the 9-5/8" shoe. The annulus will be freeze protected by dry crude. Directionally drill 8-1/2" hole to TD. Run 7" liner from TD to 250' inside 9-5/8" casing shoe and cement using Class G cement. Clean out to 7" float equipment. Change over to NaCI completion fluid. Test casing and lap to 3000 psi. Run 9-5/8" production packer on tubing. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 100' below base of permafrost, Install and test xmas tree, Displace tubing to diesel. Set and test packer, The well will be perforated after the rig as been released. Fluids incidental to the drilling of a well will be pumped down the 9-5/8" x 13- 3/8" annulus of the well. Tubing Size: MJS: 6-17-91 4-1/2", 12.6# NT13CR-80, TDS tubing with 5 GLM's. R CE!',/ED PRELIMINARY WELL PLAN Well: F-48 [22-34-12-13] PBU LOCATION: Surface: Target: T.D.: 1914' SNL, 2862' WEL, Sec. 2, T11N, R13E 1500' SNL, 3200' WEL, Sec. 34, T12N, R13E 1309' SNL, 3387' WEL, Sec. 34, T12N, R13E ESTIMATED START: 9th July 1991 OPR. DAYS TO COMPLETE' 25 (20 days drilling, 5 days completion) CONTRACTOR: Nabors 18E MAX ANGLE/SECT COURSE/KOP/BUILD RATE: 52.0/N 44.4 W/1600/2.5 Item TVDss MD(BKB) Mud Wt. 20" CONDUCTOR 13-3/8" SHOE BASE WEST SAK FORMATION 9-5/8" SHOE TOP SAG RIVER SANDSTONE CURRENT GOC TOP SADLEROCHIT TARGET TOTAL DEPTH 8O 2615 2725 5920 7872 8765 12495 8771 12505 888O 12683 8891 12700 8935 12771 9144 13111 8.5 9.5 9.0 9.7 8.5 8.5 8.5 8.5 8.5 LOGGING PROGRAM: Ooen Hole - Record all logs on magnetic tape where applicable. 12-1/4" Hole: None 8-1/2" Hole' DIL/BHCS/CNL/GR. Optional LDT Cased Hole CBT/CET and Gyro survey after rig release. MJS: 6-17-91 20" Conductor PRELIMINARY WELL PLAN PBU WELL # F-48 F-48 [22-34-12-13] PROPOSED DEPTH BKB 80' Ball Valve 13-3/8" Casing Shoe 17-1/2" Open Hole 2100' 2725' 2745' 4-1/2" 12.6# NT13CR-80, TDS Tubing with 5 GLM's 9-5/8" Packer 7" Tieback Assembly 12195' 12245' 9-5/8" Shoe 12-1/4" Open Hole 7" 26# NT13CR-80, NSCC Liner 7" PBTD 7" Liner Shoe 8-1/2" Open Hole 12495' 12505' 13031' 13111' 13111' 1' = 5280' T12N T11N WELL No. F-4~ LAT. = 70°20'18.248' LONG. = 148°46'00.940" Y = 5,974,882.73 A.S.P. X = 651,958,63 ZONE 3,362' FROM SOUTH UNE 2,863' FROM EAST lINE 0 1 2 (MILES) and that ali dlmenslons supervision, and other details are correct. Date, June 12, 1991~~35 .~%_ .,.~~ WELL PAD WELL No, F-Z~8 ASBUILT LOCATED IN PROTRACTED SECTION 2, TOWNSHIP 11 NORTH, RANGE 13 EAST, UMIAT MEREDIAN, ALASKA SURVEYED FOR: B.P. EXPLORATION P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 ~ SURVEYED BY: ARCTIC SLOPE CONSULTINO OROUP 301 DANNER SUITE 200 I ANCHORAGE, ALASKA 99518 I DRAWN BY: DAG IDA.rE: 6/10/91 T12N .35 T11N 2 11 2863' NO SCALE 2 11 F-~SX WELL PAD 'F' WELL No. F-48 ASBUILT LOCATED IN PROTRACTED SECTION 2, TOWNSHIP 11 NORTH, RANGE 1,3 EAST, UMIAT MEREDIAN, ALASKA SUR~'YED FO~ B.P. ID LORAllON P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 SURVEYED BY: ARCTIC SLOPE CONSULTING GROUP 301 DANNER SUITE 200 ANCHORAGE, ALASKA 99518 DRAWN BY.' DAG IDA~ 6/12/91 BOP STACK CONFIGURATION 1:3 5/8", 5000 PS1 WP TRIPLE RAM STACK DRILLING RISER I I ANNULAR PREVENTER ! I I I PIPE RAMS 2" KILL LINE ! I BLIND RAMS DRILLING 4" CHOKE LINE MANUAL HYDRAULIC GATE GATE SPOOL PI PE RAMS I I HYDRAULIC MANUAL GATE GATE SUN, ACE HOLE DIVERTER SYSTEM Two lines venting 90 deg, apart in directions that ensure safe down wind venting, and ex- _ .....~... tending to a point at least 100' from any potential source of ignition. r_lO" Full Opening Valves 35' or as required Dresser Sleeve 1. All pipe connections 150~ ANSi Flanges or welded connections and secured to prevent movement. 10" Diverter Uno 2. Manual 10" full opening valves mechanically connected to ensure that one valve is fail-safe open at all times. 3. All tums are 90 deg. and targeted. 10" Full opening ball valve w/Hydraulic Actuator Cellar 20" Diverter Spool w/10" Side Outlet M EM 1/3/90 $45DUA247:[DRAN043]F48 CLOSAP SHORT.LIS;1 Closest 6-JUN-1991 Approach Analysis --- Date: 6-JUN-91 Time: 15:28:11 Search Radius= 200 COURSE LINE For proposed well: F-48 [22-34-1'2-13] Location = W-E S-N TVD(SBS) Top 651958.00 5974886.00 -64.80 Bottom 645788.99 5980953.93 9408.00 Note: Ail depths in feet Below Kelly Bushing (BKB) 15:28 Page WELL IDENT A020-2210800 F-42 A029-2009500 F-5 i%029-2009700 F-6 A029-2011900 F-7 A029-2042400 F-11 A029-2042500 F-12 A029-2043400 F-13 A029-2044000 F-14 A029-2049700 J-13 A029-2073300 T-7 A029-2103000 F-24 A029-2124100 T-1 A029-2193000 F-32 A029-2194900 F-21 A029-2194901 F-21A A029-2195100 F-22 A029-2197400 F-37 ( A029-2198000 F-34 A029-2198200 F-30 A029-2209300 F-38 ( Closest Approach /PROPOSED~ /NEARBY~ CLOSEST TVD DEPART TVD DEPART DISTANCE 1364 .8 NO COORDINATE 2096 .0 1564 8 0 0 0 0 1600 0 1875 0 8021 4 8452 2 1899 1 9472 8 1600 0 1799 7 1899 1 1799 7 98 3 0 0 1382 2 1564 8 0.0 POINTS 54.3 0 0 0 0 0 0 0 0 17 0 6793 8 7345 6 19 6 8653 1 0 0 8 7 19 6 8 7 0 0 0 0 0 0 0 0 1284.4 404.6 728.4 WITHIN SPECIFIED SEARCH WINDOW 2167.6 1513 9 0 4 1 1 1599 4 1876 9 8623 2 8084 1 1925 6 8342 6 1603 1 1797 3 1954 5 1784 7 100 0 0 6 1383 0 1510 9 303.3 426.2 0.0 0.0 72 10 7 5551 7 1730 1 335 1 4069 5 14 6 395.5 298.4 392.8 0.0 0.0 161.8 406.1 607.7 721 7 294 0 184 0 70 6 19 1 4764 5 2298 2 553 4 1605 0 314 6 542 7 532 1 642 8 149 0 219.0 330 .2 691 .6 Vertical /PROPOSED~ TVD DEPART Intersection /NEARBY~ TVD DEPART VERTICAL DISTANCE 3209.6 660.8 4980.4 1403.7 1779.9 1936.7 25.4 3594.6 93.6 1659.3 4625.2 2442.7 6111.6 2550.1 1484.8 $45DUA247:[DRAN043]F48 CLOSAP SHORT.LIS;1 A029-2210100 F-39(1 99.9 0.0 100.0 SUMMARY The well which comes closest to the proposed well is: A029-2044000 F-14 Closest approach distance = KICK OFF for this run = 19.1 feet 1600.0 feet 0.1 39.0 6-JUN-1991 15:28 Page 2 $45DUA247:[DRAN043]F48 CLOSAP SHORT7.LIS;1 Search Radius= 200 7 DEGREE LEAD LINE For proposed well: F-48 [22-34-12-13] Location = W-E S-N TVD(SBS) Top 651958.00 5974886.00 -64.80 Bottom 645095.48 5980156.89 9408.00 Note: All depths in feet Below Kelly Bushing (BKB) 6-JUN-1991 --- Closest Approach Analysis Date: 6-JUN-91 Time: 15:29:11 15:29 Page Closest Approach WELL IDENT /PROPOSED% /NEARBY% TVD DEPART TVD DEPART A020-2210800 F-42 A029-2009500 F-5 A029-2009700 F-6 A029-2011900 F-7 A029-2042400 F-11 A029-2042500 F-12 A029-2043400 F-13 A029-2044000 F-14 A029-2049700 J-13 A029-2103000 F-24 A029-2124100 T-1 A029-2168600 J-24 A029-2193000 F-32 A029-2194900 F-21 A029-2194901 F-21A A029-2195100 F-22 A029-2197400 F-37 ( A029-2198000 F-34 A029-2198200 F-30 A029-2209300 F-38 ( Vertical CLOSEST /PROPOSED% DISTANCE TVD DEPART 1364.8 NO COORDINATE 2096.0 1564 8 0 0 0 0 1600 0 1854 6 8021 4 1799 7 9184 4 8575 2 1600 0 1799 7 1899 1 1700 0 98 3 0 0 1382 2 1564 8 0.0 1284.4 404.6 728.4 POINTS WITHIN SPECIFIED SEARCH WINDOW 54.3 0.0 0.0 0 0 0 14 6793 8 8283 7503 0 8 19 2 0 0 0 0 2167.0 1513.9 0.4 1 1 1599 4 1856 6 8623 2 1827 3 8187 9 9176 0 1603 1 1797 2 1954 4 1688 3 100 0 0 6 1383 0 1510 9 303.2 426.2 0.0 0.0 7.2 10.6 5551.7 318.0 3984 7 6125 3 14 6 395 5 298 4 371 6 00 0.0 161.8 406.1 Intersection /NEARBY~ TVD DEPART VERTICAL DISTANCE 602.5 3038.6 508.4 4830.5 1236.2 1801.1 721.7 294.0 184.0 70.6 1868.8 16.3 3554.8 84.9 1687.2 21.1 4115.6 555.4 2048.5 2980.5 314.6 4560.3 2359.6 7610.1 2572.6 3049.4 543.5 533.5 638.1 149.0 3386.3 856.5 4645.5 955.3 1257.5 219.0 330.2 691.6 $45DUA247:[DRAN043]F48 CLOSAP SHORT7.LIS;1 A029-2210100 F-39(1 99.9 0.0 100.0 SUMMARY The well which comes closest to the proposed well is: A029-2044000 F-14 Closest approach distance = KICK OFF for this run = 21.1 feet 1600.0 feet 0.1 39.0 6-JUN-1991 15:29 Page 2 MUD WEIGHT WELL F-48 CALCULATIONS (22-34-12-13) Mud Wt. (8-1/2" Hole): 8.5ppg. P Sag River: P Sadlerochit: P Top Sadlerochit: 3700 psi. 3575 psi. at 8800' TVDSS 3606 psi. OB Sag River: OB Top Sadlerochit: Current GOC: 200 psi. 350 psi. Above Top Sadlerochit 9-5/8" Casing Pt. Top Sag River Top Sadlerochit 8829' TVDBKB 8836' TVDBKB 8956' TVDBKB Cement Calculations 13-3/8" CASING Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry Vol: 9-5/8"CASING Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry Vol: 7" LINER Measured Depth: Basis: Total Cement Vol: 2725' 2. X Annular volume 3790. (cu ft) 2845 (cu ft) 1465 Sx Arcticset III @ 1.94 Cu ft/Sk 945 (cuft) 1015 Sx Arcticset II @ 0.93 Cu ft/Sk 12495' 90% Annular Volume to 13-3/8" + 50 cu ft 2755 (cuft) 2465 (cuft) 1380 Sx G+8% @ 1.79 Cu ft/Sk 290 (cu ft) 250 Sx Neat G @ 1.15 Cu ft/Sk 12245' (Hanger)- 13111' (Shoe) 1.5 X Annular volume to 9-5/8" shoe + 150 cuft 270 (cu ft) 230 Sx Neat G @ 1.16 Cu ft/Sk MJS: 6-17-91 I"I U D ! PILL TO ~ I' ~ pIT WATER WLI, IHE TANK I00 MUD DISTRllSUT~ON D~TC TRIP TANK D~G~ S~E R -r^~ K I,qO 88/-- ~UU~ TYPE Choke Manifold Poor Boy Degasser · Brand t Vacuum.Type Degasser Brand t Dual Tandem Shale Shaker Pioneer Mud Cleaners Pioneer MKI Centrifuge 1 - RecOrding drilling fluid, pit 'level indicator with both visual and audio warning devices at driller's console 1 - Trip Tank (75 BBL.) 1 - Drilling fluid flow sensor with readout at driller's console 11 - 5 Hp Agitators ** CHECK LIST FOR NEW WELL PERMITS ** (3) Admin (4) Casg [8] [9 thru 13] [10 & 13] · [14 thru 22] (5) BOPE ~,~,~.~. ~ -~'-e/ [23 thru 28] (6) Other (6) Addl Company YES 1. Is permit fee attached ............................................... .~, 2. Is well to be located in a defined pool ................ ' ............ ~_ 3. Is well located proper distance from property line ................... 4. Is well located proper distance from other wells ..................... 5 Is sufficient undedicated acreage available in this pool 6 Is well to be deviated & is wellbore plat included. 7 Is operator the only affected party ................ 8 Can permit be approved before 15-day wait .......... . 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. Does operator have a bond in force ................................... Is a conservation order needed ....................................... Is administrative approval needed .................................... Is lease number appropriate .......................................... Does well have a unique name & number ................................ Lease & Well NO Is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface & intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................. Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to ~"~ psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... FOR EXPLORATORY & STRATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Additional requirements ............................................. REM/~RKS 0 -rZ geology' DWJ~I~ RP~.//~ eng i nee r i ng,: MTM ,~:$~ LCS~ BEW ..,' RAEY~-,~,! ~ ]) JH rev 03/29/91 jo/6.011 INITIAL GEOI UNIT ON/OFF POOL CLASS STATUS AREA :~ SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. , No special effort has been made to chronologically organize this category of information. * HHHH HHHH * HHHH HHHH H H A LL LL II BBBB U U RRRR TTTTT' O N N * * HIt/tH HHHH H H AA LL LL II B B U U R R T O O NN N * * H~ HHHH A A LL LL II BBBB U U RRRR T O O N N N * * HHHHHHHHHHH H H AAAA LL LL II B B U U R R T O O N NN * * HHHH HHHH H H A ALL LL II BBBB U R R T O N N * * HHHH HHHH * *HHHH HHHH L O G G I N G S E R V I C E S , I N C . * * . * LIS TAPE VERIFICATION LISTING * * BP EXPLORATION * * F-48 (22-34-12-13) * * PRUDHOE BAY * * NORTH SLOPE * * ALASKA * * (OPEN HOLE - HRI/CVL/DSN-II) * Page 1 RECEIVED AUG 2 2 1991 Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION F-48 OPEN HOLE REEL HEADER RECORD TYPE 132 SERVICE NAME DATE ORIGIN OF DATA REEL NAME REEL CONTINUATION NUMBER PREVIOUS REEL NAME COMMENTS: --- COMCEN --- 91/08/10 --- ANCH --- 666215 TAPE HEADER RECORD TYPE 130 SERVICE NAME DATE ORIGIN OF DATA TAPE NAME TAPE CONTINUATION NUMBER PREVIOUS TAPE NAME COMMENTS: --- COMCEN --- 91/08/10 --- ANCH COMMENT REcoRD TYPE 232 TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA F-48 (22-34-12-13) 500292218700 BP EXPLORATION HALLIBURTON LOGGING SERVICES 09-AUG-91 RUN 1 RUN 2 RUN 3 L66621-5 McKAY/YARBRO ATTID/MESSER JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) 02 llN 13E 1914 2863 Page 2 BP EXPLORATION F-48 OPEN HOLE KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 64.83 63.83 35.73 OPEN HOLE CASING DRILLER'S BIT SIZE(IN) SIZE(IN) DEPTH(FT) 1ST STRING 2ND STRING 12.250 9.625 12461.0 3RD STRING 8.500 13179.0 PRODUCTION STRING REMARKS: HRI - CVL - DSN-II RUN IN COMBINATION. CHLORIDES = 13400 PPM. $ FILE HEADER RECORD TYPE 128 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL PREVIOUS FILE NAME --- COMCEN.001 --~-- 0 --- 91/08/10 --- 1024 --- LO COMMENT RECORD TYPE 232 FILE HEADER FILE NUMBER: 01 EDITED OPEN HOLE MAIN PASS All tool strings; depth shifted and clipped curves; all runs merged; no cased hole data. DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH HRI 13166.0 BCS 13128.0 DSN2 13103.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 12466.0 12466.0 12466.0 ......... EQUIVALENT UNSHIFTED DEPTH ......... SFL 12448.0 12538.0 12548.0 12550.0 12449.0 12537.0 12548.0 12551.0 Page 3 BP EXPLORATION F-48 OPEN HOLE 12572.0 12573.0 12579.0 12579.5 12586.0 12587.0 12596.0 12597.0 12639.0 12639.5 12710.0 12710.5 12751.0 12752.0 12791.0 12791.5 12831.5 12832.0 12869.0 12869.5 12925.5 12926.5 12976.0 12977.0 13024.0 13024.0 13067.0 13068.0 13102.0 13103.0 13166.0 13167.0 $ MERGED DATA SOURCE PBU TOOL CODE RUN NO. PASS NO. MERGE TOP MERGE BASE $ REMARKS: HRI DATA CORRECTED FOR PYRITE FROM 12614' TO 12713'. $ LIS FORMAT DATA DATUM FORMAT SPECIFICATION RECORD TYPE 64 ENTRY BLOCKS: TYPE SIZE REPR. CODE ENTRY 1 1 66 0 2 1 66 0 3 2 79 52 4 1 66 1 5 1 66 1 8 4 73 60 9 4 65 .liN 11 2 79 19 12 4 68 -999.000 14 4 65 F 15 1 66 68 16 1 66 1 0 1 66 0 DATUM SPECIFICATION BLOCKS: MNEM SERVID SERVICE~ UNITS DEPT F GR BCS 666215 GAPI FUCT DSN2 666215 CPS NUCT DSN2 666215 CPS NPHI DSN2 666215 PU-S NRAT DSN2 666215 API CODE FILE~ SIZE 00000000 0 4 00000000 0 4 00000000 0 4 00000000 0 4 00000000 0 4 00000000 0 4 ~SAMP REPR. 1 68 1 68 1 68 1 68 1 68 1 68 Page 4 BP EXPLORATION F-48 OPEN HOLE DT BCS 666215 US/F 00000000 0 4 1 68 ILD HRI 666215 OHMM 00000000 0 4 1 68 ILM HRI 666215 OHMM 00000000 0 4 1 68 SFL HRI 666215 OHMM 00000000 0 4 1 68 SP HRI 666215 MV 00000000 0 4 1 68 TENS BCS 666215 LB 00000000 0 4 1 68 DLOD BCS 666215 LB 00000000 0 4 1 68 DATA RECORD TYPE 0 DEPT = 13166.000 GR = -999.000 FUCT = -999.000 NUCT = -999.000 NPHI = -999.000 NRAT = -999.000 DT = -999.000 ILD = 2.120 ILM = 2.056 SFL = 2.110 SP = 67.917 TENS = 6034.239 DLOD = 1173.928 DEPT = 12966.000 GR = 38.380 FUCT = 3490.875 NUCT = 18196.640 NPHI = .239 NRAT = 5.561 DT = 77.160 ILD = 3.222 ILM = 3.371 SFL = 4.305 SP = 55.275 TENS = 6077.035 DLOD = 1241.097 DEPT = 12766.000 GR = 19.233 FUCT = 3214.392 NUCT = 18150.070 NPHI = .264 NRAT = 6.023 DT = 90.680 ILD = 17.760 ILM = 11.065 SFL = 11.712 SP = 49.169 TENS = 6148.362 DLOD = 1173.928 DEPT = 12566.000 GR = 92.299 FUCT = 3175.817 NUCT = 17100.470 NPHI = .247 NRAT = 5.744 DT = 74.728 ILD = 16.542 ILM = 14.200 SFL = 25.984 SP = 65.149 TENS = 5962.912 DLOD = 1197.589 FILE TRAILER RECORD TYPE 129 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL NEXT FILE NAME --- COMCEN.001 w---- 0 --- 91/08/10 --- 1024 --- LO --- COMCEN.002 FILE HEADER RECORD TYPE 128 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER --- COMCEN.002 Page 5 BP EXPLORATION F-48 OPEN HOLE DATE OF GENERATION --- 91/08/10 MAX. PHYSICAL RECORD LENGTH --- 1024 FILE TYPE --- LO OPTIONAL PREVIOUS FILE NAME --- COMCEN.001 COMMENT RECORD TYPE 232 FILE HEADER FILE NUMBER: 02 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 01 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH HRI CVL DSN2 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 13199.5 12448.0 13199.5 12448.0 13199.5 12448.0 28-JUL-91 PLS 1.3 2330 27-JUL-91 0717 28-JUL-91 13179.0 13178.0 13178.0 13166.0 1800.0 TOOL NUMBER GR DSN2 CVL HRI $ GAMMA RAY DUAL SPACED NEUTRON ACOUSTIC VELOCITY HIGH RES. INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: 114424 108829 FWS2 3BA25 8.500 12461.0 12466.0 POLYMER Page 6 BP EXPLORATION F-48 OPEN HOLE MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: 8.60 38.0 7.5 8.2 171.0 0.440 0.190 0.460 0.530 68.0 171.0 67.0 66.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 8.500 TOOL STANDOFF (IN): 0.0 REMARKS: HRI DATA CORRECTED FOR PYRITE FROM 12614' TO 12713'. $ LIS FORMAT DATA DATUM FORMAT SPECIFICATION RECORD TYPE 64 ENTRY BLOCKS: TYPE SIZE REPR. CODE ENTRY 1 1 66 0 2 1 66 0 3 2 79 96 4 1 66 1 5 1 66 1 8 4 73 30 9 4 65 .liN 11 2 79 10 12 4 68 -999.000 14 4 65 F 15 1 66 68 16 1 66 1 0 1 66 0 DATUM SPECIFICATION BLOCKS: MNEM SERVID SERVICE# UNITS DEPT F GR GEN 666215 GAPI FDSN DSN2 666215 CPS NDSN DSN2 666215 CPS NPHI DSN2 666215 DECP NRAT DSN2 666215 C/C DT CVL 666215 US/F ITT CVL 666215 API CODE FILE# SIZE 00000000 0 4 00000000 0 4 00000000 0 4 00000000 0 4 00000000 0 4 00000000 0 4 00000000 0 4 00000000 0 4 ~SAMP REPR. 1 68 1 68 1 68 1 68 1 68 1 68 1 68 1 68 Page 7 BP EXPLORATION F-48 OPEN HOLE HDR HRI 666215 00000000 0 4 1 68 HDX HRI 666215 00000000 0 4 1 68 HMR HRI 666215 00000000 0 4 1 68 HMX HRI 666215 00000000 0 4 1 68 HDRS HRI 666215 OHMM 00000000 0 4 1 68 HMRS HRI 666215 OHMM 00000000 0 4 1 68 HDCN HRI 666215 MMHO 00000000 0 4 1 68 HMCN HRI 666215 MMHO 00000000 0 4 1 68 DFL HRI 666215 OHMM 00000000 0 4 1 68 SP HRI 666215 MV 00000000 0 4 1 68 TENS GEN 666215 LB 00000000 0 4 1 68 DLOD GEN 666215 LB 00000000 0 4 1 68 TT21 CVL 666215 US/F 00000000 0 4 1 68 TT22 CVL 666215 US/F 00000000 0 4 1 68 TTll CVL 666215 US/F 00000000 0 4 1 68 TT12 CVL 666215 US/F 00000000 0 4 1 68 DATA RECORD TYPE 0 DEPT = 13199.500 GR = 33.676 FDSN = 2950.670 NDSN = 18005.240 NPHI = .288 NRAT = 6.509 DT = 80.800 ITT = .000 HDR = 350.523 HDX = 97.306 HMR = 426.092 HMX = 44.571 HDRS = -999.000 HMRS = -999.000 HDCN = -12345.000 HMCN = -12345.000 DFL = -999.000 SP = -999.000 TENS = 2268.190 DLOD = 23.281 TT21 = 433.800 TT22 = 598.200 TTll = 613.000 TT12 = 453.900 DEPT = 13099.500 GR = 29.374 FDSN = 2942.640 NDSN = 17709.930 NPHI = .285 NRAT = 6.420 DT = 91.172 ITT = .000 HDR = 361.306 HDX = 91.175 HMR = 457.790 HMX = 45.562 HDRS = 1.939 HMRS = 1.895 HDCN = 515.651 HMCN = 527.741 DFL = 2.229 SP = 51.309 TENS = 6105.566 DLOD = 1202.933 TT21 = 461.200 TT22 = 635.700 TTll = 615.100 TT12 = 437.400 DEPT = 12999.500 GR = 13.699 FDSN = 3617.728 NDSN = 18427.070 NPHI = .232 NRAT = 5.434 DT = 82.656 ITT = .000 HDR = 295.401 HDX = 71.180 HMR = 356.777 HMX = 37.097 HDRS = 2.531 HMRS = 2.430 HDCN = 395.069 HMCN = 411.567 DFL = 2.869 SP = 59.689 TENS = 6148.362 DLOD = 1434.588 TT21 = 431.200 TT22 = 602.700 TTll = 573.100 TT12 = 408.900 DEPT = 12899.500 GR = 14.869 FDSN = 4286.144 NDSN = 19225.340 NPHI = .201 NRAT = 4.785 DT = 75.536 ITT = .000 HDR = 218.755 HDX = 41.195 HMR = 271.933 HMX = 22.464 HDRS = 3.543 HMRS = 3.327 HDCN = 282.209 HMCN = 300.529 DFL = 3.825 SP = 53.236 Page 8 BP EXPLORATION F-48 OPEN HOLE TENS = 6134.097 DLOD = 1223.541 TT21 = 427.800 TT22 = 592.500 TTll = 634.400 TT12 = 462.400 DEPT = 12799.500 GR = 17.874 FDSN = 3355.297 NDSN = 18422.860 NPHI = .254 NRAT = 5.857 DT = 90.432 ITT = .000 HDR = 194.175 HDX = 25.791 HMR = 250.520 HMX = 16.834 HDRS = 3.708 HMRS = 3.425 HDCN = 269.707 HMCN = 291.956 DFL = 3.536 SP = 46.847 TENS = 6077.035 DLOD = 1166.295 TT21 = 476.600 TT22 = 652.600 TTll = 641.900 TT12 = 465.700 DEPT = 12699.500 GR = 20.766 FDSN = 3098.995 NDSN = 17827.730 NPHI = .268 NRAT = 6.137 DT = 95.660 ITT = .000 HDR = 33.523 HDX = 4.192 HMR = 64.655 HMX = 5.400 HDRS = 30.906 HMRS = 14.801 HDCN = 22.795 HMCN = 65.234 DFL = 15.193 SP = 42.478 TENS = 6005.709 DLOD = 1164.005 TT21 = 472.300 TT22 = 633.600 TTll = 600.000 TT12 = 427.900 DEPT = 12599.500 GR = 231.412 FDSN = 2702.340 NDSN = 16674.290 NPHI = .286 NRAT = 6.582 DT = 77.348 ITT = .000 HDR = 34.447 HDX = .205 HMR = 60.857 HMX = 1.162 HDRS = 27.485 HMRS = 15.869 HDCN = 37.288 HMCN = 63.963 DFL = 14.180 SP = 60.959 TENS = 6048.505 DLOD = 1223.541 TT21 = 430.000 TT22 = 581.300 TTll = 540.400 TT12 = 393.500 DEPT = 12499.500 GR = 53.927 FDSN = 2665.222 NDSN = 16533.820 NPHI = .293 NRAT = 6.618 DT = 93.536 ITT = .000 HDR = 60.294 HDX = 2.931 HMR = 94.486 HMX = 1.556 HDRS = 14.377 HMRS = 9.664 HDCN = 69.717 HMCN = 102.464 DFL = 9.643 SP = 47.684 TENS = 5791.729 DLOD = 1135.000 TT21 = 477.000 TT22 = 665.400 TTll = 646.700 TT12 = 463.900 FILE TRAILER RECORD TYPE 129 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL NEXT FILE NAME --- COMCEN.002 --mt 0 --- 91/08/10 --- 1024 --- LO --- COMCEN.003 FILE HEADER RECORD TYPE 128 Page 9 BP EXPLORATION F-48 OPEN HOLE FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL PREVIOUS FILE NAME --- COMCEN.003 ------ 0 --- 91/08/10 --- 1024 --- LO --- COMCEN.002 COMMENT RECORD TYPE 232 FILE HEADER FILE NUMBER: 03 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 02 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH HRI CVL DSN2 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 13204.5 12752.0 13204.5 12752.0 13204.5 12752.0 28-JUL-91 PLS 1.3 2330 27-JUL-91 0717 28-JUL-91 13179.0 13178.0 13178.0 13166.0 1800.0 TOOL NUMBER GR DSN2 CVL HRI $ GAMMA RAY DUAL SPACED NEUTRON ACOUSTIC VELOCITY HIGH RES. INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 114424 108829 FWS2 3BA25 8.500 12461.0 12466.0 Page 10 BP EXPLORATION F-48 OPEN HOLE BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: POLYMER 8.60 38.0 7.5 8.2 171.0 0.440 0.190 0.460 0.530 68.0 171.0 67.0 66.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 8.5O0 TOOL STANDOFF (IN): 0.0 REMARKS: BOTTOM OF TOOL STUCK AT 12735' DURING THIS PASS. TOOL STRING WAS FISHED FROM HOLE. $ LIS FORMAT DATA DATUM FORMAT SPECIFICATION RECORD TYPE 64 ENTRY BLOCKS: TYPE SIZE REPR. CODE ENTRY 1 1 66 0 2 1 66 0 3 2 79 96 4 1 66 1 5 1 66 1 8 4 73 30 9 4 65 .liN 11 2 79 10 12 4 68 -999.000 14 4 65 F 15 1 66 68 16 1 66 1 0 1 66 0 DATUM SPECIFICATION BLOCKS: MNEM SERVID SERVICE# UNITS DEPT F GR GEN 666215 GAPI FDSN DSN2 666215 CPS NDSN DSN2 666215 CPS NPHI DSN2 666215 DECP API CODE FILE# SIZE 00000000 0 4 00000000 0 4 00000000 0 4 00000000 0 4 00000000 0 4 ~SAMP REPR. 1 68 1 68 1 68 1 68 1 68 Page 11 BP EXPLORATION F-48 OPEN HOLE NRAT DSN2 666215 C/C 00000000 0 4 1 68 DT CVL 666215 US/F 00000000 0 4 1 68 ITT CVL 666215 00000000 0 4 1 68 HDR HRI 666215 00000000 0 4 1 68 HDX HRI 666215 00000000 0 4 1 68 HMR }{RI 666215 00000000 0 4 1 · 68 HMX HRI 666215 00000000 0 4 1 68 HDRS HRI 666215 OHMM 00000000 0 4 1 68 HMRS HRI 666215 OHMM 00000000 0 4 1 68 HDCN HRI 666215 MMHO 00000000 0 4 1 68 HMCN HRI 666215 MMHO 00000000 0 4 1 68 DFL HRI 666215 OHMM 00000000 0 4 1 68 SP HRI 666215 MV 00000000 0 4 1 68 TENS GEN 666215 LB 00000000 0 4 1 68 DLOD GEN 666215 LB 00000000 0 4 1 68 TT21 CVL 666215 US/F 00000000 0 4 1 68 TT22 CVL 666215 US/F 00000000 0 4 1 68 TTll CVL 666215 US/F 00000000 0 4 1 68 TT12 CVL 666215 US/F 00000000 0 4 1 68 DATA RECORD TYPE 0 DEPT = 13204.500 GR = 23.633 FDSN = 2927.292 NDSN = 18123.780 NPHI = .293 NRAT = 6.605 DT = 57.600 ITT = .000 HDR = 349.650 HDX = 103.671 HMR = 425.352 HMX = 35.974 HDRS = -12345.000 HMRS = -12345.000 HDCN = -12345.000 HMCN = -12345.000 DFL = -12345.000 SP = -999.000 TENS = 2039.944 DLOD = 17.556 TT21 = 379.300 TT22 = 498.200 TTll = 499.000 TT12 = 387.300 DEPT = 13104.500 GR = 18.402 FDSN = 2954.096 NDSN = 18215.040 NPHI = .292 NRAT = 6.578 DT = 85.696 ITT = .000 HDR = 321.061 HDX = 86.496 HMR = 387.022 HMX = 41.499 HDRS = 2.463 HMRS = 2.385 HDCN = 406.082 HMCN = 419.252 DFL = 2.542 SP = 55.405 TENS = 6191.158 DLOD = 1225.449 TT21 = 441.600 TT22 = 610.700 TTll = 601.600 TT12 = 438.400 DEPT = 13004.500 GR = 18.382 FDSN = 4304.833 NDSN = 19091.780 NPHI = .197 NRAT = 4.731 DT = 76.780 ITT = .000 HDR = 278.807 HDX = 71.261 HMR = 320.971 HMX = 35.989 HDRS = 2.890 HMRS = 2.888 HDCN = 346.065 HMCN = 346.218 DFL = 3.387 SP = 50.159 TENS = 6233.954 DLOD = 1220.869 TT21 = 406.300 TT22 = 569.200 TTll = 582.800 TT12 = 422.900 DEPT = 12904.500 GR = 17.698 FDSN = 4158.540 NDSN = 19416.940 NPHI = .208 NRAT = 4.981 DT = 84.128 ITT = .000 HDR = 251.458 Page 12 BP EXPLORATION F-48 OPEN HOLE }{DX = 53.455 HMR = 310.759 HMX = 28.514 HDRS = 3.022 HMRS = 2.978 HDCN = 330.864 HMCN = 335.760 DFL = 3.354 SP = 56.545 TENS = 6205.423 DLOD = 1188.812 TT21 = 431.200 TT22 = 559.000 TTll = 565.400 TT12 = 448.700 DEPT = 12804.500 GR = 19.745 FDSN = 3680.617 NDSN = 19065.930 NPHI = .238 NRAT = 5.526 DT = 87.636 ITT = .000 HDR = 163.992 HDX = 21.086 HMR = 204.645 HMX = 11.598 HDRS = 4.854 HMRS = 4.414 HDCN = 205.999 HMCN = 226.530 DFL = 4.879 SP = 47.187 TENS = 6148.362 DLOD = 1176.599 TT21 = 462.700 TT22 = 640.700 TTll = 649.100 TT12 = 465.300 FILE TRAILER RECORD TYPE 129 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL NEXT FILE NAME --- COMCEN.003 ~ 0 --~ 5 --- 91/08/10 --- 1024 --- LO TAPE TRAILER RECORD TYPE 131 SERVICE NAME DATE ORIGIN OF DATA TAPE NAME TAPE CONTINUATION NUMBER NEXT TAPE NAME COMMENTS: --- COMCEN --- 91/08/10 --- ANCH REEL TRAILER RECORD TYPE 133 SERVICE NAME DATE ORIGIN OF DATA REEL NAME REEL CONTINUATION NUMBER NEXT REEL NAME COMMENTS: --- COMCEN --- 91/08/10 --- ANCH --- 666215 END OF TAPE ENCOUNTERED Page 13