HomeMy WebLinkAbout216-135Guhl, Meredith D (DOA)
From: Guhl, Meredith D (DOA)
Sent: Monday, November 26, 2018 9:37 AM
To: 'Callahan, Mike S'
Cc: Loepp, Victoria T (DOA); Boyer, David L (DOA)
Subject: KRU 1L-15 L1, L1-01, L1-02 PTDs 216-135, 216-136, 216-138, Permits Expired
Hello Mike,
The following Permits to Drill, issued to ConocoPhillips Alaska, have expired under Regulation 20 AAC 25.005 (g). The
PTDs will be marked expired in the AOGCC database.
• KRU 1L-15 L1, PTD 216-135, Issued 18 November 2016
• KRU 1L-15 L1-01 PTD 216-136, Issued 18 November 2016
• KRU 1L-15 1-1-02, PTD 216-138, Issued 18 November 2016
If you have any questions, please contact me.
Thank you,
Meredith
Meredith Guhl
Petroleum Geology Assistant
Alaska Oil and Gas Conservation Commission
333 W. 7th Ave, Anchorage, AK 99501
meredith.guhl@alaska.gov
Direct: (907) 793-1235
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.
The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail,
please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at
907-793-1235 or meredith.guhl@alaska.gov.
THE STATE Alaska Oil and Gas
ofAT ASKA ConsenTation Commission
GOVERNOR BILL WALKER
Gary Eller
CTD Team Lead
ConocoPhillips Alaska, Inc.
P.O. Box 100360
Anchorage, AK 99510-0360
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1 L-15 L 1
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 216-135
Surface Location: 387' FNL, 143' FEL, SEC. 31, T11N, R10E, UM
Bottomhole Location: 3263' FNL, 1179' FEL, SEC. 30, T11N, R10E, UM
Dear Mr. Eller:
Enclosed is the approved application for permit to re -drill the above referenced development well.
The permit is for a new wellbore segment of existing well Permit No. 184-183, API No. 50-029-
21204-00-00. Production should continue to be reported as a function of the original API number
stated above.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Daniel T. Seamount, Jr.
Commissioner
DATED this g y of November, 2016.
RECEIVED
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
OCT 27 2016
1 a. Type of Work:
1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp
1 c. Specify if well is proposed for:
Drill ❑ t Lateral Q
Stratigraphic Test ❑ Development - Oil ❑� Service - Winj ❑ Single Zone 8
Coalbed Gas ❑ Gas Hydrates ❑
Redrill ❑ Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑✓ '
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond: Blanket Q , Single Well ❑
11. Well Name and Number: f pb
ConocoPhillips Alaska Inc
Bond No. 5952180K;ZW1
L-15L1
3. Address:
6. Proposed Depth:
12. Field/Pool(s):
P.O. Box 100360 Anchorage, AK 99510-0360
MD: 10200' ` TVD4S 5995'
Kuparuk River Field / '
4a. Location of Well (Governmental Section):
7. Property Designation (Lease Number):
Surface: 387' FNL, 143' FEL, Sec 31, T11N, R10E, UM
ADL 25659
Kuparuk Oil Pool ,
Top of Productive Horizon:
8. Land Use Permit:
13. Approximate Spud Date:
1290' FNL, 1246' FEL, Sec 31, T11N, R10E, UM
ALK 2585
11/4/2016
Total Depth:
9. Acres in Property:
14. Distance to Nearest Property:
3263' FNL, 1179' FEL, Sec 30, T11N, R10E, UM
2490 •
16000'
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL (ft): 118' •
115. Distance to Nearest Well Open
Surface: x- 539923 y- 5949191 Zone- 4 r
GL Elevation above MSL (ft): 155r 3/ {
to Same Pool: 167' (1 L-02)
16. Deviated wells: Kickoff depth: 6330 feet ,
17. Maximum Potential Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 95 degrees ,
Downhole: 3702 , Surface: 3114
18. Casing Program:
Specifications
Top - Setting Depth - Bottom
Cement Quantity, c.f. or sacks
Hole
Casing
Weight
Grade
Coupling
Length
MD
TVD
MD
TVD
(including stage data)
3"
2-3/8"
4.7#
L-80
ST-L
3660'
6540'
5940'
10200'
5995'
N/A
19, PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft):
Total Depth TVD (ft):
Plugs (measured):
Effect. Depth MD (ft):
Effect. Depth TVD (ft):
Junk (measured):
6705'
6266'
N/A
6704'
6265'
Fish - 6480'
Casing
Length
Size
Cement Volume
MD
TVD
Conductor/Structural
102'
16"
214 sx Cold Set II
102'
102'
Surface
3475'
9-5/8"
1025 sx AS III & 700 sx Class G
3475'
3475'
Intermediate
Production
6704'
7"
275 sx Class G & 250 sx AS 1
6704'
6265'
Liner
Perforation Depth MD (ft): 6235' - 6268'
Perforation Depth TVD (ft): 5923' - 5949'
6393' - 6416'
6044' - 6061'
20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program Q Time v. Depth Plot ❑ Shallow Hazard Analysis❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program Q 20 AAC 25.050 requirements0
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not Mike Callahan 263-4180 Az_
be deviated from without prior written approval. Contact
Email mike. cal lahanecop.corn
Printed Name Gary Eller kTitle CTD Team Lead
Signature Phone �?j - Z Date
Commission Use Only
Permit to Drill JAPI
Number:
Permit Approval
See cover letter for other
Number: a I —13s
50- Q — 0- 6rj- cjir.�
Date: /.- I *--I Le
requirements.
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales:
Other: A- 3500 P5� - Samples req'd: Yes No[d Mud log req'd: Yes❑ Noy
�
HzS measures: Yes No❑ Directional svy req'd: Yes No❑
_
L
(4Acing exception req'd: Yes ❑ No[?f Inclination -only svy req'd: Yes❑ Nod
V Post initial injection MIT req'd: Yes No❑
APPROVED BY
Approved by: COMMISSIONER THE COMMISSION Date:
Submit Form and 10 01 evised 11/2015) This permit is valid for 24 months from the da of approval (20 AAC 25.005(g)) Attachments in Duplicate
OR] ANAL �o,z��i��o��;, tic)4
si
ConocoPhillip
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
October 26, 2016
Commissioner - State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Dear Commissioner:
i
RECEIVED
OCT 2 7 2201AOGC�6
`
ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill 3 laterals out of the Kuparuk Well 1 L-
15 using the coiled tubing drilling rig, Nabors CDR3-AC. ✓
To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC
25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being
limited to 500' from the original point.
Attached to this application are the following documents:
— 10-401 Applications for 1 L-151-1, 1 L-151-1-01, and 1 L-151-1-02
— Detailed Summary of Opera ions
— Directional Plans for 1L-151-1, 1L-151-1-01, and 1L-151-1-02
— Proposed CTD Schematic
If you have any questions or require additional information, please contact me at 907-263-4180.
Sincerely,
Mike Callahan
ConocoPhillips Alaska
Coiled Tubing Drilling Engineer
Kuparuk CTD Laterals NABORSAASKA
1 L-15L1, 1 L-15L1-01 & 1 L-15L1-02 CD
Application for Permit to Drill Document 211C
1.
Well Name and Classification...........................................................................................................2
(Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b))......................................................................................................................2
2.
Location Summary.............................................................................................................................2
(Requirements of 20 AAC 25.005 c 2..........................................2
3.
Blowout Prevention Equipment Information...................................................................................2
(Requirements of 20 AAC 25.005(c)(3)).....................................................................................................................................................2
4.
Drilling Hazards Information and Reservoir Pressure....................................................................2
(Requirements of 20 AAC 25.005(c)(4)).....................................................................................................................................................2
5.
Procedure for Conducting Formation Integrity tests.....................................................................2
(Requirements of 20 AAC 25.005(c)(5))......................................................................................................................................................2
6.
Casing and Cementing Program......................................................................................................3
(Requirements of 20 AAC 25.005(c)(6))......................................................................................................................................................3
7.
Diverter System Information.............................................................................................................3
(Requirements of 20 AAC 25.005(c)(7))......................................................................................................................................................3
8.
Drilling Fluids Program.....................................................................................................................3
(Requirements of 20 AAC 25.005(c)(8))......................................................................................................................................................3
9.
Abnormally Pressured Formation Information...............................................................................4
(Requirements of 20 AAC 25.005(c)(9))......................................................................................................................................................4
10.
Seismic Analysis................................................................................................................................4
(Requirements of 20 AAC 25.005(c)(10))....................................................................................................................................................4
11.
Seabed Condition Analysis...............................................................................................................4
(Requirements of 20 AAC 25.005(c)(11))....................................................................................................................................................4
12.
Evidence of Bonding.........................................................................................................................4
(Requirements of 20 AAC 25.005(c)(12))....................................................................................................................................................4
13.
Proposed Drilling Program...............................................................................................................4
(Requirements of 20 AAC 25.005(c)(13))....................................................................................................................................................4
Summaryof Operations.................................................................................................................................................. 4
LinerRunning.................................................................................................................................................................. 6
14.
Disposal of Drilling Mud and Cuttings.............................................................................................6
(Requirements of 20 AAC 25.005(c)(14)).................................................................................................................................................... 6
15.
Directional Plans for Intentionally Deviated Wells..........................................................................6
(Requirements of 20 AAC 25.050(b)).......................................................................................................................................................... 6
16.
Attachments.......................................................................................................................................6
Attachment 1: Directional Plans for 1L-15L1, 1L-151-1-01 & 1L-151-1-02 laterals........................................................... 6
Attachment 2: Current Well Schematic for 1 L-15........................................................................................................... 6
Attachment3: Proposed Well Schematic for 1L-151-1, 1L-15L1-01 & 1L-151-1-02 laterals.............................................6
Pagel of 6 October 26, 2016
PTD Application: 1 L-151-1, 1 L-151-1-01 & 1 L-151-1-02
1. Well Name and Classification
(Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b))
The proposed laterals described in this document are 1 L-151-1, 1 L-151-1-01 & 1 L-151-1-02. All laterals will be
classified as producer wells.
2. Location Summary
(Requirements of 20 AAC 25.005(c)(2))
These laterals will target the A sand package in the Kuparuk reservoir. See attached 10-401 form for surface
and subsurface coordinates of the 1L-151-1, 1L-151-1-01 & 1L-151-1-02.
3. Blowout Prevention Equipment Information
(Requirements of 20 AAC 25.005 (c)(3))
Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors QDR-3-nr.
BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations.
— Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. Using the
maximum formation pressure in the area of 3702 psi in 1 L-16 (i.e. 12.1 ppg EMWYthe maximum
potential surface pressure in 1 L-15, assuming a gas gradient of 0.1 psi/ft, would be 3102 psi. See the
"Drilling Hazards Information and Reservoir Pressure" section for more details.
— The annular preventer will be tested to 250 psi and 2,500 psi.
4. Drilling Hazards Information and Reservoir Pressure
(Requirements of 20 AAC 25.005 (c)(4))
Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a))
The formation pressure in KRU 1 L-15 was measured to be 2962 psi (9.5 ppp EMM on.4/24L20A5. The
maximum downhole pressure in the 1 L-15 vicinity is to the south in the 1 L-16 injector at 3702 psi (12.1 ppg
EMW) from May of 2014. The 1 L-151-1-01 sidetrack will be drilled south and could encounter formation
pressure from 1L-16.
Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b))
Wells on 1 L pad have injected gas, so there is a chance of encountering free gas while drilling the 1 L-15
laterals. If significant gas is detected in the returns the contaminated mud can be diverted to a storage tank
away from the rig.
Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c))
The major expected risk of hole problems in the 1 L-15 laterals will be shale instability across faults. Managed
pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings.
5. Procedure for Conducting Formation Integrity tests
(Requirements of 20 AAC 25.005(c)(5))
The 1 L-15 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity -
test is not required.
Page 2 of 6 October 26, 2016
PTD Application: 1 L-15L1, 1 L-151_1-01 & 1 L-151_1-02
6. Casing and Cementing Program
(Requirements of 20 AAC 25.005(c)(6))
New Completion Details
Lateral Name
Liner Top
Liner Btm
Liner Top
Liner Btm
Liner Details
MD
MD
TVDSS
TVDSS
1 L-15L1
6540'
10200'
5940'
5995'
2-3/8", 4.7#, L-80, ST-L slotted liner;
aluminum billet on top
1L-15L1-01
6380'
9300'
5912'
6001'
2-3/8", 4.7#, L-80, ST-L slotted liner;
aluminum billet on to
1L-15L1-02
6325'
10200'
5879'
5933'
2-3/8", 4.7#, L-80, ST-L slotted liner;
de to ment sleeve on to
Existing Casing/Liner Information
Category
OD
Weight
(ppf)
Grade
Connection
Top MD
Btm MD
Top
TVD
Btm
TVD
Burst
psi
Collapse
psi
Conductor
16"
62.5
H-40
Welded
0'
102'
0'
102'
1640
670
Surface
9-5/8"
36.0
J-55
BTC
0'
3475'
0'
3475'
3520
2220
Production
7"
26.0
J-55
BTC
0'
6704'
0'
6265'
4980
4320
Tubing
3-1/2"
9.3
L-80
EUE-8RD
0
6345'
0
6008'
10160
10530
7. Diverter System Information
(Requirements of 20 AAC 25.005(c)(7))
Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a
diverter system is not required.
8. Drilling Fluids Program
(Requirements of 20 AAC 25.005(c)(8))
Diagram of Drilling System
A diagram of the Nabors CDR3-AC mud system is on file with the Commission.
Description of Drilling Fluid System
— Window milling operations: Water -based Power-vis milling fluid (8.6 ppg)
— Drilling operations: Water -based Flo -Pro drilling mud (8.6 ppg). This mud weight will not
hydrostatically overbalance the reservoir pressure, overbalanced conditions will be maintained using
MPD practices described below.
— Completion operations: The well will be loaded with 11.8 ppg potassium formate completion fluid in
order to provide formation over -balance and well bore stability while running completions. If higher
pressure is encountered, potassium formate will be used to provide over -balance.
Managed Pressure Drilling Practice
Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on
the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud
weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled
tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3
"Blowout Prevention Equipment Information".
In the 1 L-15 laterals we will target a constant BHP of 11.8_ppg EMW at the window. The constant BHP target will
be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if
increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be
employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates
or change in depth of circulation will be offset with back pressure adjustments.
Page 3 of 6 October 26, 2016
PTD Application: 1 L-151-1, 1 L-151-1-01 & 1 L-151-1-02
Pressure at the 1 L-15 Window (6330' MD, 6001' TVD) Using MPD
Pumps On 1.5 b m
Pumps Off
A -sand Formation Pressure 9.5
2965 psi
2965 psi
Mud Hydrostatic 8.6
2684 psi
2684 psi
Annular friction i.e. ECD, 0.090 si/ft
570 psi
0 psi
Mud + ECD Combined
(no choke pressure)
3254 psi
2684 psi
(underbalanced -281psi)
Target BHP at Window 11.8 pp)
3683 psi
3683 psi
Choke Pressure Required to Maintain
Target BHP
429 psi
999 psi
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
Background
KRU well I L-15 is a Kuparuk A Sand producer equipped with 3-1/2" tubing and 7" production casing. The
CTD sidetrack will utilize three laterals to target the A4/A5 Sands to north and A5 Sand to the south of 1 L-
15. —'
A rig workover was performed to install anew upper completion with a tandem wedge assembly. Prior to
CTD operation, an inner wedge will be set at 6330' MD.
Nabors CDR3-AC will kick-off at 6330' MD. All three laterals will be completed with 2-3/8" slotted liner
from T w771r lre-last lateral liner top located inside the tubing tail.
The 1 L-1 51_1 northern lateral will exit the big tail pipe at 6330' MD and TD at 10200' MD, targeting the
A4 and A5 sands. It will be completed with 2-3/8" slotted liner from TD up to 6540'MD with an aluminum
billet for kicking off the I L-15L1-01.
The 1 L-15L1-01 lateral will drill to the south to a TD of 9300' MD targeting the A5 sand. It will be
completed with 2-3/8" slotted liner from TD up to 6380' MD with an aluminum billet for kicking off the
1L-15L1-02.
Page 4 of 6 October 26, 2016
PTD Application: 1 L-15L1, 1 L-151_1-01 & 1 L-151_1-02
The 1L-15L1-02 lateral will drill to the north to a TD of 10,200' MD targeting the A4 and A5 sands. It will
be completed with slotted liner from TD to 6325' MD in the tubing tail with a deployment sleeve.
Pre-CTD Work
1. RU Slickline: Obtain SBHP
2. RU E-line: Set inner wedge at 6330' MD.
3. Prep site for Nabors CDR3-AC and set BPV.
Ria Work
1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPS, test.
2. 1L-15L1 Sidetrack (A4/A5 sand - North)
i. Mill 2.80" window at 6330' MD.
ii. Drill 3" bi-center lateral to TD of 10200' MD.
iii. Run 2%" slotted liner with an aluminum billet from TD up to 6540' MD.
3. 1 L-15 L 1 -0 1 Lateral (A5 sand - South)
i. Kick off of the aluminum billet at 6540' MD.
ii. Drill 3" bi-center lateral to TD of 9300' MD.
iii. Run 2%" slotted liner with aluminum billet from TD up to 6380' MD.
4. 1 L-15L1-02 Lateral (A4/A5 sand -North)
i. Kick off of the aluminum billet at 6380' MD.
ii. Drill 3" bi-center lateral to TD of 10200' MD.
iii. Run 2%" slotted liner with deployment sleeve from TD up to 6325' MD.
5. Freeze protect, set BPV, ND BOPE, and RDMO Nabors CRD3-AC.
Post -Rig Work
1. Pull BPV
2. Obtain SBHP
3. Install gas lift design
4. Put on production
Pressure Deployment of BHA/
The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on
the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double
swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the
BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two
barriers to reservoir pressure, both internal and external to the BHA, during the deployment process.
During BHA deployment, the following steps are observed.
— Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is
installed on the BOP riser with the BHA inside the lubricator.
— Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and
the BHA is lowered in place via slick -line.
— When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate
reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate
Page 5 of 6 October 26, 2016
PTD Application: 1 L-151-1, 1 L-151-1-01 & 1 L-151_1-02
reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from
moving when differential pressure is applied. The lubricator is removed once pressure is bled off above
the deployment rams.
— The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the
closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the
double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized,
and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole.
During BHA undeployment, the steps listed above are observed, only in reverse.
Liner Running
The 1 L-15 laterals will be displaced to an overbalanced fluid (11.8 ppg potassium formate) prior to
running liner. See "Drilling Fluids" section for more details.
,y — While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for
emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew
conducts a deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will
provide secondary well control while running 2-3/8" liner. �,
14. Disposal of Drilling Mud and Cuttings
(Requirements of 20 AAC 25.005(c)(14))
• No annular injection on this well.
• All solid waste will be transported to the gQnd and inject facility at DS-4 Prudhoe Bay for disposal.
• Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18
or 1 B disposal facilities) or Prudhoe DS-4 if a Kuparuk facility is unavailable.
• All wastes and waste fluids hauled from the pad must be properly documented and manifested.
• Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200).
15. Directional Plans for Intentionally Deviated Wells
(Requirements of 20 AAC 25.050(b))
— The Applicant is the only affected owner.
— Please see Attachment 1: Directional Plans
— Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. /
— MWD directional, resistivity, and gamma ray will be run over the entire open hole section.
— Distance to Nearest Property Line (measured to KPA boundary at closest point)
Lateral Name
Distance
1 L-15L1
16000'
1 L-151_1-01
14350'
1 L-15L1-02
16000'
— Distance to Nearest Well within Pool
Lateral Name
Distance
Well
1 L-15L1
167'
1 L-02
1 L-15L1-01
124'
1 L-13
1 L-15L1-02
136'
1 L-02
16.Attachments
Attachment 1: Directional Plans for IL-15L1, 1L-15L1-01 & IL-15L1-02laterals
Attachment 2: Current Well Schematic for 1L-15
Attachment 3: Proposed Well Schematic for IL-15L1, 1L-15L1-01 & IL-15L1-02laterals
Page 6 of 6 October 26, 2016
/o/zz1&
y
NG&
`um
sz
a
(UpliSn 05Z) (})gjlONJ(-)41nOS
:n
O
_
I
_
1
n0
ur
N
N O
o a o
� � O
m m
101 1
is 1-]
co
� O
O 1l
J M
p
O N A ]
(6 O O
o d N C
c a a a c
c— O
Q H Y W V W C.O . W m
o
Ol I'SI-'11
- -
U (O a M � C O m
N CO CO . CO m C') V'CO CO c-CO CO cO N� 0m lO V'NO mmOI�NN
-O N
..
m O V N C O V m V C O M C O 1 C M M M
I�aORm V a' V CO (O CD O.-M.- W (OM�mNaYmM CDOO
t` C O .9 W C O a 0 I (D M C V �- N V C O I� N m O i-- M :' C O 1 O N N N
l!')
J
- co
CO
J M
N O - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
U O CO O O O O O O O O O O O O O O O O O O O O O O O O O O O O
m
� O O��� N N�� O C D O C C") C O O O O O C n C O 0 0 C O 0 C (� 0 0 0
o .- m m m m rn rn �O Ch 1� m m rn � rn
- -
9 01 I "l-[--II
R
........
... ..
O
m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
lU O V 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
O N N V O� I_ r r ti r..: r..: 1, r.� ti ti r,: r�: n r,: r.� r-.: r r--: ti r-.: r-.: P': r,- r
-
s01 f
SI-71
--
-
Q J V
C O
-
00 �t M CO CO m---
r t o O N M N N M N W N- m I- C O m a D C Rr--: N R I• (D V M 17 17 N
•� N 1� m o o M o . . . '
w N M V M m r O C 0 O I� N m r C'� m C O O. N M C O M l r A r- a O O N C
+ m m N M I M I t O M N O m l t o V O I t D C'
mO)�O—NMM V to tO Cn tDmtO�MNNN NN '-000
' o
O
..
J
Q
Q
(ENO N
W O
O
M
CO
Cnm a' Mr m mco CDC O m� 1� NMCO mt01-0 1�0 CO
0 U
= C '! � m �- C O m M C R f O (D C 0 C R I- m O C V' N m Lq Lq O 1l N N
Z N V M a f N C O V' m J. C O M C O 1-- C M M C O O M C D � v— m O N
+ M 0 w I� Co a m v v a r(J CO CO O � M � w c0 m V N* m m— C Co O
Ir CO M CO CO COS I�Cp CO�MN`-N� u'Y I�COm O'-M at!P C-4 NN
N
O
-
J
LU
�i
�i
��
O
Z Co
LB
WUN C=) Yr r-- 01- O 1.- V rA CO 117 C0 CO Un N cf M
(n 1-IN N CO I�mmm� COS-1`M I�M� V'm Nl� �MNM� V CONOO
Q to CO CO M O CO N M r[J r0 O_ V 1� CO CD CO m iY N M I
C[J I� m M M M N N M M M N N •- N M M M M Vr Y� 1, m CO 1� CO m
m m m m m m m m m m m m m m m m m m m m m m m m m
n
rLo � � LO rn rn u-, rn rn in
'N O .- O I- M CO Cn CO m O M M N N m N CO '�t r, r M O N
Q m m N I� M m m Cn V CO 1� CO CO CD O NJ CO O CO t0 1 V CO 1 CO
NNNNOM CN MCOONCOCn LcjCON CO
M M C"J m 0 0 N M M V
N N N N M M M M M M M M m '
_ 9
c
N
-
"Of-
-
O.L I
I
SI-7l
SI-,II
—
-._
_
O LO C, I`-�� V NN CO I��M a{ CO COC I�� V ct COmI�N
C C O <I • (O O C O M M C O M 1 T O O m C O M M c t M) O t2 N N M I� N V C O C O
?�O
O
m0<Y O � Cy N m COm COM N Cr;CO CO COM CO O m(-- r a u")O CO CO
M mm mm CO 00 Omm mm CO CO M a CO CO m CO CO CO 1 CO mm CO W
_
W O
+
p o 0 o m m o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 o v v o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
�OC� at at Ou7 C=) Cn0000=1 C7 o006 Lo Lo CC vi C() Lc)tri C[i uio
OmmO M aD CO w LOCO CO COM N ICON I�N0C1'906
M M M V 10 I- t` C O m N M V C O m N C O (O 1 O D m N M LO 1- C O m N
m ommo'omocD l-,n, I-ao moo aom oo m mmmmmmo
0 0 0
O O O
in vD vri
0
vi
0 o 0
O o O
v�i O .-
b
O
Z Ocf)
U NM CO Co1 CO mO NM V CO CO I:COmO NM"tCo CO I�CO m0
N N N N N N N N N N M
U I S n
( /8 00[)
4; d a
E'J ( a a n a
Q I n l
ConocoPhillips
ConocoPhillips (Alaska) Inc. -Kup2
Kuparuk River Unit
Kuparuk 1 L Pad
1 L-15
Plan: 1 L-15L1 wp02
Standard Planning Report
25 October, 2016
WE Pkpwv
BAKER
HUGHES
�- ConocoPhillips NFAI
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-15L1
Design:
1 L-15L1_wp02
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
project Kuparuk River Unit, North Slope Alaska, United States
Nap System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
3eo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
flap Zone: Alaska Zone 04 Using geodetic scale factor
Site
Kuparuk 1 L Pad
Site Position:
Northing:
5,949,190.90usft Latitude:
70° 16' 19.650 N
From:
Map
Easting:
539,916.78 usft Longitude:
149° 40' 37.763 W
Position Uncertainty:
0.00 usft Slot Radius:
0.000 in Grid Convergence:
0.30 °
Well
1 L-15
Well Position
+N/-S
+E/-W
0.00 usft Northing:
0.00 usft Easting:
5,948,581.09 usft Latitude:
539,922.94 usft Longitude:
700 16' 13,652 N
149° 40' 37.678 W
Position Uncertainty
0.00 usft Wellhead Elevation:
usft Ground Level:
—83.20 usft
Wellbore
i
1 L-151-1
Magnetics
Model Name
Sample Date
Declination Dip Angle
Field Strength
(nT)
BG G M 2016 12/1 /2016
17.86 80.91
57,543
[Design
1L-15L1_wp02
Audit Notes:
Version:
Phase: PLAN
Tie On Depth:
6,300.00
Vertical Section:
Depth From (TVD)
+N/-S +E/-W
Direction
(usft)
(usft) (usft)
(I
-83.20
0.00 0.00
0.00
1012512016 12:12:56PM Page 2 COMPASS 5000.1 Build 74
r
ConocoPhillips rGi1I
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1L-15
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
1 L-15 @ 118.00usft (Parker 141)
Site:
Kuparuk 1 L Pad
North Reference:
True
Well:
1L-15
Survey Calculation Method:
Minimum Curvature
Wellbore:
1 L-151-1
Design:
1 L-151-1_wp02
Plan Sections
Measured
TVD Below
Dogleg
Build
Turn
Depth
Inclination
Azimuth
System
+N/-S
+E/-W
Rate
Rate
Rate
TFO
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(°/100ft)
(°/100ft)
(°/100ft)
(°) Target
6,300.00
39.67
232.80
5,855.75
-792.86
-922.58
0.00
0.00
0.00
0.00
6,330.00
40.41
232.71
5,878.72
-804.54
-937.94
2.47
2.47
-0.30
-4.51
6,351.00
44.61
232.71
5,894.20
-813.13
-949.23
20.00
20.00
0.00
0.00
6,464.48
90.00
232.71
5,936.84
-874.91
-1,030.35
40.00
40.00
0.00
0.00
6,634.48
91.85
300.70
5,933.71
-884.15
-1,190.25
40.00
1.09
39.99
88.00
6,710.00
92.31
305.97
5,930.97
-842.69
-1,253.29
7.00
0.60
6.98
85.00
6,785.00
92.30
311.22
5,927.96
-795.96
-1.311.84
7.00
-0.01
7.01
90.00
6,860.00
89.67
315.77
5,926.67
-744.36
-1,366.22
7.00
-3.51
6.06
120.00
6,985.00
85.31
323.36
5,932.16
-649.41
-1,447.14
7.00
-3.49
6.08
120.00
7,110.00
89.71
330.93
5,937.59
-544.60
-1,514.81
7.00
3.52
6.06
60.00
7,210.00
95.44
334.96
5,933.10
-455.69
-1,560.22
7.00
5.73
4.03
35.00
7,310.00
93.02
341.55
5,925.72
-363.11
-1,597.14
7.00
-2.42
6.59
110.00
7,410.00
92.02
348.48
5,921.32
-266.67
-1,622.96
7.00
-0.99
6.94
98.00
7,570.00
91.98
359.69
5,915.70
-107.87
-1.639.41
7.00
-0.02
7.00
90.00
7,900.00
89.87
22.70
5,910.30
213.62
-1.575.78
7.00
-0.64
6.97
95.00
8,160.00
88.31
40.83
5,914.47
433.73
-1,439.51
7.00
-0.60
6.98
95.00
8,260.00
88.33
33.83
5,917.40
513.16
-1,378.93
7.00
0.01
-7.00
-90.00
8,560.00
88.44
12.82
5,925.97
786.99
-1,260.86
7.00
0.04
-7.00
-90.00
8,635.00
83.51
11.02
5,931.24
860.16
-1,245.41
7.00
-6.58
-2.41
-160.00
8,710.00
88.06
8.39
5,936.75
933.87
-1,232,82
7.00
6.07
-3.50
-30.00
8,825.00
90.15
0.62
5,938.55
1,048.40
-1,223.79
7.00
1.82
-6.76
-75.00
8,975.00
89.24
11.08
5,939.35
1,197.41
-1,208.53
7.00
-0.61
6.97
95.00
9,100.00
86.27
2.84
5,944,26
1,321.27
-1,193.40
7.00
-2.38
-6.59
-110.00
9,225.00
86.31
11.61
5,952.37
1,444.90
-1,177.73
7.00
0.03
7.01
90.00
9,375.00
77.74
5.47
5.973.18
1.591.58
-1.155.61
7.00
-5.71
-4.09
-145.00
9,525.00
88.24
5.47
5,991.45
1.739.57
-1.141.44
7.00
7.00
0.00
0.00
9,705.00
95.46
15.81
5,985.62
1,916.03
-1,108.32
7.00
4.01
5.75
55.00
9,855.00
90.16
6.73
5,978.24
2,062.76
-1,079.11
7.00
-3.53
-6.05
-120.00
9,955.00
86.67
12.80
5,981.01
2,161.22
-1,062.17
7.00
-3.49
6.07
120.00
10,200.00
86.82
355.62
5,995.03
2,404.24
-1,044.28
7.00
0.06
-7.01
-90.00
1012512016 12:12:56PM Page 3 COMPASS 5000.1 Build 74
ConocoPhillips FGaI
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1 L-15
Company:
ConocoPhillips
(Alaska)
Inc. -Kup2
TVD Reference:
Mean
Sea Level
Project:
Kuparuk River Unit
MD Reference:
1L-15 @ 118.00usft (Parker
141)
Site:
Kuparuk 1 L Pad
North Reference:
True
Well:
1 L-15
Survey Calculation
Method:
Minimum
Curvature
Wellbore:
1 L-151-1
Design:
1 L-15L1_wp02
Planned Survey
Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth
Inclination Azimuth
System
+N/-S
+E/-W
Section
Rate
Azimuth
Northing
Easting
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(°/100ft)
(°)
(usft)
(usft)
6,300.00
39.67
232.80
5,855.75
-792.86
-922.58
-792.86
0.00
0.00
5,947,783.43
539,004.67
TIP
6,330.00
40.41
232.71
5,878.72
-804.54
-937.94
-804.54
2.47
-4.51
5.947,771.67
538,989.37
KOP
6,351.00
44.61
232.71
5,894.20
-813.13
-949.23
-813.13
20.00
0.00
5,947,763.02
538,978.13
End 20
dls, Start 40 dls
6,464.48
90.00
232.71
5,936.84
-874.91
-1,030.35
-874.91
40.00
0.00
5,947,700.81
538,897.34
4
6,634.48
91.85
300.70
5,933.71
-884.15
-1,190.25
-884.15
40.00
88.00
5,947,690.73
538.737.51
End 40
dls, Start 7 dis
6,710.00
92.31
305.97
5,930.97
-842.69
-1,253.29
-842.69
7.00
85.00
5,947,731.84
538,674.26
6
6,785.00
92.30
311.22
5,927.96
-795.96
-1.311.84
-795.96
7.00
90.00
5,947,778.26
538,615.47
7
6,860.00
89.67
315.77
5,926.67
-744.36
-1,366.22
-744.36
7.00
120.00
5,947,829.56
538,560.83
8
6,985.00
85.31
323.36
5,932.16
-649.41
-1,447.14
-649.41
7.00
120.00
5,947,924.07
538,479.41
9
7,110.00
89.71
330.93
5,937.59
-544.60
-1.514.81
-544.60
7.00
60.00
5,948,028.52
538,411.19
10
7,210.00
95.44 '
334.96
5,933.10
-455.69
-1,560.22
-455.69
7.00
35.00
5,948,117.18
538,365.31
11
7,310.00
93.02
341.55
5.925.72
-363.11
-1,597.14
-363.11
7.00
110.00
5,948,209.55
538,327.91
12
7,410.00
92.02
348.48
5,921.32
-266.67
-1,622.96
-266.67
7.00
98.00
5,948,305.85
538,301.58
13
7,570.00
91.98
359.69
5,915.70
-107.87
-1,639.41
-107.87
7.00
90.00
5.948,464.54
538,284.29
14
7,900.00
89.87
22.70
5.910.30
213.62
-1,575.78
213.62
7.00
95.00
5,948,786.33
538,346.21
1s
8.160.00
88.31
40.83
5,914.47
433.73
-1,439.51
433.73
7.00
95.00
5,949,007.13
538,481.29
16
8,260.00
88.33
33.83
5,917.40
513.16
-1,378.93
513.16
7.00
-90.00
5,949.086.88
538,541.44
17
8,560.00
88.44
12.82
5.925.97
786.99
-1,260.86
786.99
7.00
-90.00
5,949,361.30
538.658.04
18
8,635.00
83.51
11.02
5,931.24
860.16
-1,245.41
860.16
7.00
-160.00
5,949,434.55
538,673.10
19
8,710.00
88.06
8.39
5,936.75
933.87
-1,232.82
933.87
7.00
-30.00
5,949,508.31
538,685.31
20
8,825.00
90.15
0.62
5,938.55
1,048.40
-1,223.79
1,048.40
7.00
-75.00
5,949,622.88
538,693.72
21
8,975.00
89.24
11.08
5,939.35
1,197.41
-1.208.53
1,197.41
7.00
95.00
5,949,771.96
538,708.19
22
9,100.00
86.27
2.84
5.944.26
1,321.27
-1,193.40
1.321.27
7.00
-110.00
5,949,895.88
538,722.66
23
9,225.00
86.31
11.61
5,952.37
1,444.90
-1,177.73
1,444.90
7.00
90.00
5,950,019.58
538,737.68
24
9,375.00
77.74
5.47
5,973.18
1,591.58
-1,155.61
1,591.58
7.00
-145.00
5,950,166.36
538,759.01
26
9,525.00
88.24
5.47
5,991.45
1,739.57
-1,141.44
1,739.57
7.00
0.00
5,950,314.41
538,772.40
1012512016 12:12:56PM
Page 4
COMPASS 5000.1 Build 74
�.- ConocoPhillips
ConocoPhillips Planning Report
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference
Company:
ConocoPhillips (Alaska)
Inc. -Kup2
TVD Reference:
Project:
Kuparuk River Unit
MD Reference:
Site:
Kuparuk 1 L Pad
North Reference:
Well:
1 L-15
Survey Calculation Method:
Wellbore:
1 L-1511
Design:
1 L-15L1_wp02
Planned Survey
Measured
TVD Below
Vertical
Depth
Inclination Azimuth
System
+N/-S
+E/-W Section
(usft)
(°) (°)
(usft)
(usft)
(usft) (usft)
26
9,705.00
95.46 15.81
5,985+62
1,916.03
-1,108.32 1,916.03
27
9,855.00
90.16 6.73
5,978.24
2,062.76
-1,079.11 2,062.76
28
9,955.00
86.67 12.80
5,981.01
2,161.22
-1,062.17 2,161.22
29
10,200.00
86.82 355.62
5,995.03
2,404.24
-1,044.28 2,404.24
Planned TD at 10200.00
ri.I
RAKER
HUGHES
Well 1 L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Dogleg
Toolface
Map
Map
Rate
Azimuth
Northing
Easting
(°/100ft)
(°)
(usft)
(usft)
7.00
55.00
5,950,491.03
538,804.58
7.00
-120.00
5,950,637.90
538,833.01
7.00
120.00
5,950,736.43
538,849.43
7.00
-90.00
5,950,979.52
538,866.03
1012512016 12:12:56PM Page 5 COMPASS 5000.1 Build 74
f
ConocoPhillips ��..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1 L-15
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
1L-15 @ 118.00usft (Parker 141)
Site:
Kuparuk 1 L Pad
North Reference:
True
Well:
1 L-15
Survey Calculation Method:
Minimum Curvature
Wellbore:
1 L-151-1
Design:
1 L-15L1_wp02
Targets
_ - --
Target Name
hitlmiss target Dip Angle Dip Dir. TVD
+N/-S +E/-W
Northing
Easting
Shape (°) (°) (usft)
(usft) (usft)
(usft)
(usft)
Latitude Longitude
1L-151-1_T04 0.00 0.00 5,942.00
-6,900.471,138,532.27
5,947,720.00
1,678,364.00
700 1' 5.681 N 1400 33' 10.121 W
- plan misses target center by 1139471.22usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
- Point
1L-1511 T09 0,00 0.00 5,930.00
-5,498.981,138,845.74
5,949,123.00
1,678,670.00
70° 1' 18.829 N 140° 32' 55.212 W
plan misses target center by 1139778.03usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1 L-151-1_Fault3 0.00 0.00 5,941.00
-5,360.221,138,894.48
5,949,262.00
1,678,718.00
70° V 20.105 N 140° 32' 53.233 W
plan misses target center by 1139826.21 usft at 6300.00usft MD (5855.75 TVD,-792.86 N. -922.58 E)
Polygon
Point 1 5,941.00
0.00 0.00
5,949,262.00
1,678,718.00
Point 5,941.00
1.00 1.00
5,949,263.01
1,678.718.99
1L-151-1_T08 0.00 0.00 5,923.00
-5,769.521,138,753.29
5,948,852.00
1,678,579.00
70° 1' 16.338 N 140° 32' 58.998 W
- plan misses target center by 1139686.74usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
- Point
1L-151-1_Fault1_M 0.00 0.00 0.00
-6,611.351,138,514.80
5,948,009.00
1,678,345.00
70° V 8.514 N 140° 33' 9.378 W
- plan misses target center by 1139467.28usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
- Rectangle (sides W1,000.00 H1.00 D0.00)
1 L-151-1_T02 0.00 0.00 5,936.00
-7,200,341,138,877.72
5,947,422.00
1,678,711.00
70° V 2.263 N 140° 33' 1.599 W
plan misses target center by 1139818.31 usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1L-151-1 T05 0.00 0.00 5,929.00
-6,677.201,138,485.45
5,947,943.00
1,678,316.00
70° V 7.917 N 140° 33' 10.494 W
plan misses target center by 1139423.22usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1L-15L1_T12 0.00 0.00 5,996.00
-4,520.741,139,009.94
5,950,102.00
1,678,829.00
700 V 28.087 N 1400 32' 46.353 W
plan misses target center by 1139938.62usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1 L-151-1-01_Faultl_M 0.00 0.00 0.00
-8,085.131,138,253.95
5,946,534.00
1,678,092.00
70° 0' 54.586 N 140' 33' 23.098 W
plan misses target center by 1139214.92usft at 6300.00usft
MD (5855.75 TVD,-792.86 N,-922.58 E)
Rectangle (sides W1,000.00 1-11.00 D0.00)
1 L-151-1_T14 0.00 0.00 6,001.00
-3,903.131,139.097.23
5,950,720.00
1,678,913.00
70' 1' 33.956 N 140° 32' 41.224 W
plan misses target center by 1140024.06usft at 6300.00usft
MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1L-151-1_Faultl 0.00 0.00 5.928.00
-6,611.351,138,514.80
5,948,009.00
1.678,345.00
70° 1' 8.514 N 140' 33' 9.378 W
plan misses target center by 1139452.23usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Polygon
Point 1 5,928.00
0.00 0.00
5,948,009.00
1,678,345.00
Point 5,928.00
1.00 1.00
5,948,010.01
1,678,345.99
1 L-15 CTD Polygon Sou 0.00 0.00 0.00
-7,318.271,139,240.13
5,947,306.00
1,679,074.00
70° V 0.586 N 140' 32' 51.816 W
- plan misses target center by 1140196.42usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
- Polygon
Point 1 0.00
0.00 0.00
5.947,306.00
1,679,074.00
Point 0.00
-130.08-368.72
5,947,173.98
1,678,706.01
Point 0.00
-192.21-536.07
5,947,110.97
1,678.539.01
Point 0.00
-378.39-696.07
5,946,923.96
1,676.380.02
Point 0.00
-580.00-774.13
5,946,721.96
1,678,303.03
Point 0.00
-898.95-789.81
5,946,402.96
1,678,289.05
Point? 0.00
-1,245.77-832.64
5,946,055.95
1,678,248.06
Point 0.00
-1,641.47-897.72
5,945,659.95
1,678,185.09
Point 0.00
-2,231.27-948.83
5,945,069.95
1,678,137.11
Point 10 0.00
-2,488.29-950.18
5,944,812.95
1,678,137.12
Point 11 0.00
-2,403.13-1,359.78
5,944,895.93
1,677,727.12
Point 12 0.00
-1,903.52-1,274.14
5,945,395.94
1,677,810.10
1012512016 12:12:56PM Page 6 COMPASS 5000.1 Build 74
ConocoPhillips WGaI
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-151-1
Design:
1 L-15L1_wp02
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1L-15
Mean Sea Level
1 L-15 @ 118.O0usft (Parker 141)
True
Minimum Curvature
Point 13
0.00
-1,438.66
-1,236.70
5,945,860.94
1,677,845.07
Point 14
0.00
-827.83
-1,191.48
5.946,471.94
1,677,887.04
Point 15
0.00
-418.01
-1,148.32
5,946,881.95
1,677,928.03
Point 16
0.00
-112.79
-993.70
5,947,187.95
1,678,081.01
Point 17
0.00
135.99
-756.37
5,947,437.96
1,678,316.99
Point 18
0.00
266.58
-484.65
5,947,569.98
1,678,587.99
Point 19
0.00
368.47
-81.07
5,947,674.00
1,678,990.98
Point20
0.00
0.00
0.00
5,947,306.00
1,679,074.00
1 L-1511_Fault3_M 0.00 0.00
0.00
-5.360.221,138,894.48
5,949,262.00
1,678,718.00
70° V 20.105 N 140° 32' 53.233 W
- plan misses target center by 1139841.25usft
at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
- Rectangle (sides W1,000.00 1-11.00 D0.00)
1 L-15 CTD Polygon Nor 0.00 0.00
0.00
-7,311.271,139,240.17
5,947,313.00
1,679,074.00
70' V 0.654 N 140' 32' 51.785 W
- plan misses target center by 1140196.42usft
at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Polygon
Point 1
0.00
0.00 0.00
5,947,313.00
1,679.074.00
Point
0.00
-75.99-194.42
5,947,235.99
1,678,880.00
Point
0.00
9.52-479.00
5,947,319.98
1,678,595.00
Point4
0.00
246.78-713.78
5,947,555.97
1,678,358.99
Points
0.00
622.80-899.83
5,947,930.96
1,678,170.97
Point
0.00
977.12-952.97
5,948,284.96
1,678,115.95
Point
0.00
1,261.70-868.47
5,948,569.95
1,678.198.94
Point
0.00
1.648.28-588.41
5,948,957.97
1,678.476.91
Point
0.00
2,418.87-494.35
5,949,728.98
1,678,566.88
Point 10
0.00
2,759.46-409.55
5,950,069.98
1,678,649.86
Point 11
0.00
3,417.93-294.08
5,950,728.99
1,678,761.82
Point 12
0.00
3,660.55-216.80
5,950,971.99
1,678,837.81
Point 13
0.00
3,645.42 -1.85
5,950,958.00
1,679,052.82
Point 14
0.00
3,423.14 45.99
5,950,736.00
1.679,101.83
Point 15
0.00
3.069.33 2.12
5,950,382.00
1,679.059.84
Point 16
0.00
2,715.70 -75.74
5,950,027.99
1,678,983.86
Point 17
0.00
2,403.12-161.39
5,949,714.99
1,678,899.88
Point 18
0.00
2,077.02-149.11
5,949,389.00
1,678,913.89
Point 19
0.00
1,765.13-177.75
5,949,076.99
1,678,886.91
Point20
0.00
1,459.80-311.37
5,948,770.98
1,678,754.92
Point21
0.00
1,127.83-515.13
5,948,437.97
1,678,552.95
Point22
0.00
925.99-550.20
5,948,235.97
1,678,518.95
Point23
0.00
592.57-475.94
5.947,902.98
1,678.594.97
Point24
0.00
390.71-316.98
5,947,701.98
1,678,754.98
Point25
0.00
354.47 -81.15
5,947,667.00
1,678,990.98
Point26
0.00
0.00 0.00
5,947,313.00
1,679,074.00
1 L-151-1 T10 0.00 0.00
5,944.00
-5,374.081,138.867.40
5,949,248.00
1,678,691.00
700 1' 20.010 N 1400 32' 54.062 W
- plan misses target center by 1139799.19usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
- Point
1L-151-1_T03 0.00 0.00
5,932.00
-7,158.421,138,704.92
5,947,463.00
1,678,538.00
700 V 2.923 N 140' 33' 6.325 W
plan misses target center by 1139645.28usft at 6300.00usft MD (5855.75 TVD,-792.86 N. -922.58 E)
Point
1 L-151-1_T07 0.00 0.00
5,915.00
-6,066.81 1,138,613.70
5,948,554.00
1.678.441.00
70° 1' 13.656 N 140° 33' 4.236 W
plan misses target center by 1139548.48usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1 L-151-1_T13 0.00 0.00
5,982.00
-4,228.971,139,060.50
5,950,394.00
1,678,878.00
70' V 30.846 N 140' 32' 43.666 W
- plan misses target center by 1139988.26usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
- Point
11--151-1_Fault2_M 0.00 0.00
0.00
-5,758.571,138.763.35
5,948,863.00
1,678,589.00
70° 1' 16.430 N 140° 32' 58.665 W
plan misses target center by 1139711.79usft at 6300.00usft
MD (5855.75 TVD,-792.86
N,-922.58 E)
Rectangle (sides W1,000.00 1-11.00 D0.00)
1L-151-1_T01 0.00 0.00
5.943.00
-7,187.261,139,051.81
5,947,436.00
1,678,885.00
70' V 2.135 N 140' 32' 56.601 W
plan misses target center by 1139992.32usft at 6300.00usft
MD (5855.75 TVD,-792.86
N,-922.58 E)
Point
1L-151-1_T06 0.00 0.00
5,920.00
-6,400.241,138,499.92
5,948,220.00
1,678,329.00
70' 1' 10.585 N 140' 33' 8.896 W
Ian misses target center by 1139436.29usft at 6300.00usft MD 5855.75 TVD-792.86
N-922.58 E
1012512016 12:12:56PM
Page 7
COMPASS 5000.1 Build 74
ConocoPhillips FGbI
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1 L-15
Wellbore:
1 L-151-1
Design:
1 L-15L1_wp02
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
- Point
1L-15L1_T11
0.00 0.00 5.954.00-4,839.511,138,960.25
5,949,783.00
plan misses target center by 1139890.01 usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1L-151-1_Fault2
0.00 0.00 5,923.00-5,758.571,138,763.35
5,948,863.00
plan misses target center by 1139696.75usft at 6300.00usft MD (5855.75 TVD,-792.86
N,-922.58 E)
Polygon
Point 1
5,923.00 0.00 0.00
5,948,863.00
Point 2
5,923.00 1.00 1.00
5,948,864.01
1L-15L1-01_Faultl
0.00 0.00 5,992.00-8,085.131,138.253.95
5,946,534.00
plan misses target center by 1139199.88usft at 6300.00usft MD (5855.75 TVD,-792.86
N,-922.58 E)
Polygon
Point 1
5,992.00 0.00 0.00
5,946,534.00
Point 2
5,992.00 1.00 1.00
5.946.535.01
Casing Points
Measured
Vertical
Depth
Depth
(usft)
(usft) Name
10,200.00
5,995.03 2 3/8
Well 1L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
1,678,781.00 700 1' 25.065 N 1400 32' 49.132 W
1,678,589.00 700 1' 16.430 N 140° 32' 58.665 W
1, 678, 589.00
1, 678, 589.99
1,678,092.00 70' 0' 54.586 N 140- 33' 23.098 W
1, 678, 092.00
1, 678, 092.99
Casing Hole
Diameter Diameter
(in) (in)
2.375 3.000
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/-S
+E/-W
(usft)
(usft)
(usft)
(usft)
Comment
6,300.00
5,855.75
-792.86
-922.58
TIP
6,330.00
5,878.72
-804.54
-937.94
KOP
6,351.00
5,894.20
-813.13
-949.23
End 20 dls, Start 40 dls
6,464.48
5,936.84
-874.91
-1,030.35
4
6,634.48
5,933.71
-884.15
-1,190.25
End 40 dls, Start 7 dls
6,710.00
5,930.97
-842.69
-1,253.29
6
6,785.00
5,927.96
-795.96
-1,311.84
7
6,860.00
5,926.67
-744.36
-1,366.22
8
6,985.00
5,932.16
-649.41
-1,447.14
9
7,110.00
5,937.59
-544.60
-1,514.81
10
7,210.00
5,933.10
-455.69
-1,560.22
11
7,310.00
5,925.72
-363.11
-1,597.14
12
7,410.00
5,921.32
-266.67
-1,622.96
13
7,570.00
5,915.70
-107.87
-1,639.41
14
7,900.00
5,910.30
213.62
-1,575.78
15
8,160.00
5,914.47
433.73
-1,439.51
16
8,260.00
5,917.40
513.16
-1,378.93
17
8,560.00
5,925.97
786.99
-1.260.86
18
8,635.00
5,931.24
860.16
-1,245.41
19
8,710.00
5,936.75
933.87
-1,232.82
20
8,825.00
5,938.55
1,048.40
-1,223.79
21
8,975.00
5.939.35
1,197.41
-1,208.53
22
9,100.00
5.944.26
1,321.27
-1,193.40
23
9,225.00
5,952.37
1,444.90
-1,177.73
24
9,375.00
5,973.18
1.591.58
-1,155.61
25
9,525.00
5,991.45
1,739.57
-1,141.44
26
9,705.00
5,985.62
1,916.03
-1,108.32
27
9,855.00
5,978.24
2,062.76
-1.079.11
28
9,955.00
5,981.01
2,161.22
-1,062.17
29
10,200.00
5,995.03
2,404.24
-1,044.28
Planned TD at 10200.00
1012512016 12:12:56PM Page 8 COMPASS 5000.1 Build 74
ConocoPh i I I i ps
ConocoPhillips (Alaska) Inc. -Kup2
Kuparuk River Unit
Kuparuk 1 L Pad
1 L-15
1 L-15L1-01
Plan: 1 L-15L1-01_wp03
Standard Planning Report
25 October, 2016
F a-
Z Pp�
BAKER
NUGHES
�. ConocoPhillips Raw
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-1511-01
Design:
1L-151-1-01_wp03
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Project Kuparuk River Unit, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
Site Kuparuk 1 L Pad
Site Position: Northing: 5,949,190.90 usft Latitude: 700 16' 19.650 N
From: Map Easting: 539,916.78 usft Longitude: 1490 40' 37.763 W
Position Uncertainty: 0.00 usft Slot Radius: 0.000in Grid Convergence: 0.30 °
Well 1 L-15
Well Position +N/-S 0.00 usft Northing: 5,948,581.09 usft Latitude: 70° 16' 13.652 N
+E/-W 0.00 usft Easting: 539,922.94 usft Longitude: 149° 40' 37.678 W
Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level- 83.20 usft
Wellbore 1L-15L1-01
I
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
(°) (°) (nT)
BGGM2016 12/1/2016 17.86 80.91 57,543
Design 1 L-1 5L1-01_wp03
Audit Notes:
Version: Phase: PLAN Tie On Depth: 6,540.00
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
(usft) (usft) (usft) (I
-83.20 0.00 0.00 200.00
Plan Sections
Measured TVD Below Dogleg Build Turn
Depth Inclination Azimuth System +N/-S +E/-W Rate Rate Rate TFO
(usft) (°) (°) (usft) (usft) (usft) (°1100ft) (°/100ft) (°/100ft) (°) Target
6,540.00 91-01 262.90 5,936.16-903.11-1,099.47 0.00 0.00 0.00 0.00
6,610.00 95.25 260.45 5,932.34-913.22-1,168.61 7.00 6.06 -3.51 -30.00
6,760.00 90.00 251.34 5,925.48-949.70-1,313.73 7.00 -3.50 -6.06-120.00
6,960.00 90.00 237.34 5,925.48-1,036.07-1,493+57 7.00 0.00 -7.00 -90.00
7,110.00 87.28 227.20 5,929.04-1,127.70-1,612.01 7.00 -1.81 -6.77-105.00
7,310.00 87.28 213.18 5,938.52-1,279.93-1,740.61 7.00 0.00 -7.01 -90.00
7,610.00 85.82 192.20 5,956.57-1,554.65-1,855.49 7.00 -0.49 -7.00 -94.00
7,850.00 89.31 175.75 5,966.77-1,793.00-1,872.01 7.00 1.46 -6.85 -78.00
8,050.00 89.31 189.75 5,969.17-1,992+26-1,881.56 7.00 0.00 7.00 90.00
8,150.00 89.31 182.75 5,970.37-2,091.60-1,892.44 7.00 0.00 -7.00 -90.00
8,275.00 87.05 191.20 5,974.34-2,215.49-1,907.59 7.00 -1.81 6.77 105.00
8,375.00 87.05 198.21 5,979.49-2,312.03-1,932+92 7.00 0.00 7.01 90.00
8,575.00 89.00 184.34 5,986.40-2,507.56-1,971.90 7.00 0.97 -6.93 -82.00
8,725.00 89.00 194.84 5,989.02-2,655.24-1,996.85 7.00 0.00 7.00 90.00
9,025.00 89.00 173.84 5,994.28-2,952.66-2,019.42 7.00 0.00 -7.00 -90.00
9,300.00 88.32 193.08 6,000.70-3,225.79-2,035.92 7.00 -0.24 7.00 92.00
1012512016 12:25:34PM Page 2 COMPASS 5000.1 Build 74
`- ConocoPhillips WE..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-151-1-01
Design:
1 L-15L1-01_wp03
Planned Survey
Measured TVD Below
D h
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
ept Inclination Azimuth System +N/-S +E/-W
(usft) (I (I (usft) (usft) (usft)
6,540.00 91.01 262.90 5,936.16-903.11-1,099.47
TIP/KOP
6,610.00 95.25 260.45 5,932.34-913.22-1,168.61
Start 7 dls
6,760.00 90.00 251.34 5,925.48-949.70-1,313.73
3
6,960.00 90.00 237.34 5,925.48-1,036.07-1,493.57
4
7,110.00 87.28 227.20 5,929.04-1,127.70-1,612.01
5
7,310.00 87.28 213.18 5,938.52-1,279.93-1,740.61
6
7,610.00 85.82 192.20 5,956.57-1,554.65-1,855.49
7
7,850.00 89.31 175.75 5,966.77-1,793.00-1,872.01
8
8,050.00 89.31 189.75 5,969.17-1,992.26-1,881.56
9
8,150.00 89.31 182.75 5,970.37-2,091.60-1,892.44
10
8,275.00 87.05 191.20 5,974.34-2,215.49-1,907.59
11
81375.00 87.05 198.21 5,979.49-2,312.03-1,932.92
12
8,575.00 89.00 184.34 51986.40-2,507.56-1,971.90
13
8,725.00 89.00 194.84 5,989.02-2,655.24-1,996.85
14
9,025.00 89.00 173.84 5,994.28-2,952.66-2,019.42
15
9,300.00 88.32 193.08 6,000.70-3,225.79-2,035.92
Planned TD at 9300.00
Well 1L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Vertical
Well 1L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Vertical
Dogleg
Toolface
Map
Rate
(°/100ft)
0.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
Map
Easting
(usft)
538, 828.38
538,759.30
538,614.39
538,435.04
538, 317.09
538,189.32
538,075.90
538, 060.65
538,052.15
538, 041.81
538, 027.32
538,002.50
537,964.56
537, 940.40
537, 919.41
537, 904.36
10/25/2016 12.25:34PM Page 3 COMPASS 5000.1 Build 74
ConocoPhillips NA..
ConocoPhillips Planning Report BAKER
HUGHES
Database: EDM Alaska NSK Sandbox
Company: ConocoPhillips (Alaska) Inc. -Kup2
Project: Kuparuk River Unit
Site: Kuparuk 1 L Pad
Well: 1L-15
Wellbore: 1 L-15L1-01
Design: 1 L-151-1-01_wp03
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1 L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Targets
Target Name
hittmiss target Dip Angle Dip Dir.
TVD
+N/-S +E/-W
Northing
Easting
Shape V) (1)
(usft)
(usft) (usft)
(usft)
(usft)
Latitude Longitude
1L-151-1-01_T02 0.00 0.00
5,933.00
-7,235.331,138,876.53
5,947,387.00
1,678,710.00
70° V 1.925 N 140' 33' 1.783 W
- plan misses target center by 1139993.59usft
at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
- Point
1 L-151-1_Fault3 0.00 0.00
5,941.00
-5,360.221.138.894.48
5,949,262.00
1,678,718.00
700 1' 20.105 N 1400 32' 53.233 W
- plan misses target center by 1140002.67usft
at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
- Polygon
Point 1
5,941.00
0.00 0.00
5,949,262.00
1,678,718.00
Point 2
5,941.00
1.00 1.00
5,949,263.01
1,678,716.99
1 L-1511_Faultl_M 0.00 0.00
0.00
-6,611.351.138,514.80
5,948,009.00
1,678,345.00
70° 1' 8.514 N 140' 33' 9.378 W
- plan misses target center by 1139644.03usft at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
- Rectangle (sides W1,000.00 1-11.00 D0.00)
1L-151-1-01_T03 0.00 0.00
5,930.00
-7,349.181,138,655.90
5,947.272.00
1,678,490.00
70' 1' 1.143 N 140° 33' 8.534 W
plan misses target center by 1139773.60usft at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
Point
1L-151-1-01_T04 0.00 0.00
5,943.00
-7,589.181,138,463.61
5,947,031.00
1,678,299.00
70' 0' 59.094 N 140' 33' 15.022 W
plan misses target center by 1139582.70usft at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
Point
1 L-151-1-01_Faultl_M 0.00 0.00
0.00
-8,085.131,138,253.95
5.946.534.00
1,678,092.00
700 0' 54.586 N 1400 33' 23.098 W
- plan misses target center by 1139391.53usft at 6540.00usft
MD (5936.16 TVD,-903.11
N,-1099.47 E)
- Rectangle (sides W1,000.00 1-11.00 D0.00)
1L-151-1_Faultl 0.00 0.00
5,928.00
-6,611.351,138,514.80
5,948,009.00
1,678,345.00
70° 1' 8.514 N 140' 33' 9.378 W
plan misses target center by 1139628.57usft at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
Polygon
Point 1
5,928.00
0.00 0.00
5,948,009.00
1,678,345.00
Point
5,928.00
1.00 1.00
5,948,010.01
1,678,345.99
1 L-15 CTD Polygon Sou 0.00 0.00
0.00
-7.318.271,139,240.13
5,947,306.00
1,679,074.00
700 1' 0.586 N 140' 32' 51.816 W
- plan misses target center by 1140373.10usft at 6540.00usft
MD (5936.16 TVD,-903.11
N,-1099.47 E)
Polygon
Point 1
0.00
0.00 0.00
5,947,306.00
1,679,074.00
Point
0.00
-130.08-368.72
5,947,173.98
1,678,706.01
Point 3
0.00
-192.21-536.07
5,947,110.97
1,678,539.01
Point
0.00
-378.39-696.07
5,946,923.96
1,678,380.02
Points
0.00
-580.00-774.13
5,946,721.96
1,678,303.03
Point
0.00
-898.95-789.81
5,946,402.96
1,678,289.05
Point
0.00
-1,245.77-832.64
5,946,055.95
1,678,248.06
Point
0.00
-1,641.47-897.72
5,945,659.95
1,678,185.09
Point
0.00
-2,231.27-948.83
5,945,069.95
1,678,137.11
Point 10
0.00
-2,488.29-950.18
5,944,812.95
1.678,137.12
Point 11
0.00
-2,403.13-1,359.78
5,944.895.93
1,677,727.12
Point 12
0.00
-1,903.52-1,274.14
5,945,395.94
1.677,810.10
Point 13
0.00
-1,438.66-1,236.70
5,945.860.94
1.677.845.07
Point 14
0.00
-827.83-1,191.48
5,946,471.94
1.677.887.04
Point 15
0.00
-418.01-1,148.32
5,946,881.95
1,677,928.03
Point 16
0.00
-112.79-993.70
5,947,187.95
1,678,081.01
Point 17
0.00
135.99-756.37
5,947,437.96
1,678,316.99
Point 18
0.00
266.58-484.65
5,947,569.98
1,678,587.99
Point 19
0.00
368.47 -81.07
5,947,674.00
1,678,990.98
Point 20
0.00
0.00 0.00
5,947,306.00
1,679,074.00
1 L-151-1_Fault3_M 0.00 0.00
0.00
-5,360.221,138,894.48
5,949,262.00
1,678,718.00
70° V 20.105 N 140° 32' 53.233 W
plan misses target center by 1140018.12usft at 6540.00usft
MD (5936.16 TVD,-903.11
N,-1099.47 E)
Rectangle (sides W1,000.00 H1.00 D0.00)
1L-15 CTD Polygon Nor 0.00 0.00
0.00
-7,311.271.139,240.17
5,947,313.00
1,679,074.00
70' V 0.654 N 140' 32' 51.785 W
- plan misses target center by 1140373.10usft at 6540.00usft
MD (5936.16 TVD,-903.11
N,-1099.47 E)
1012512016 12:25:34PM Page 4 COMPASS 5000.1 Build 74
I �
ConocoPhillips ��..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1 L-15
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
1L-15 @ 118.00usft (Parker 141)
Site:
Kuparuk 1 L Pad
North Reference:
True
Well:
1 L-15
Survey Calculation Method:
Minimum Curvature
Wellbore:
1 L-15L1-01
Design:
1 L-15L1-01_wp03
Polygon
Point 1
0.00
0.00
0.00
5,947,313.00
1,679,074.00
Point
0.00
-75.99
-194.42
5,947,235.99
1,678,880.00
Point
0.00
9.52
-479.00
5,947,319.98
1,678,595.00
Point
0.00
246.78
-713.78
5,947,555.97
1,678,358.99
Point 5
0.00
622.80
-899.83
5,947,930.96
1,678,170.97
Point
0.00
977.12
-952.97
5,948,284.96
1,678,115.95
Point
0.00
1,261.70
-868.47
5,948,569.95
1,678,198.94
Point
0.00
1.648.28
-588.41
5,948,957.97
1,678.476.91
Point
0.00
2,418.87
-494.35
5,949,728.98
1,678,566.88
Point 10
0.00
2,759.46
-409.55
5,950,069.98
1.678,649.86
Point 11
0.00
3,417.93
-294.08
5,950,728.99
1,678,761.82
Point 12
0.00
3,660.55
-216.80
5,950,971.99
1,678,837.81
Point 13
0.00
3.645.42
-1.85
5,950,958.00
1,679,052.82
Point 14
0.00
3,423.14
45.99
5,950,736.00
1,679,101.83
Point 15
0.00
3,069.33
2.12
5,950,382,00
1,679,059.84
Point 16
0.00
2,715.70
-75.74
5,950,027.99
1,678,983.86
Point 17
0.00
2,403.12
-161.39
5,949,714.99
1,678,899.88
Point 18
0.00
2,077.02
-149.11
5,949,389.00
1,678,913.89
Point 19
0.00
1.765.13
-177.75
5,949,076.99
1,678,886.91
Point20
0.00
1,459.80
-311.37
5,948,770.98
1,678,754.92
Point21
0.00
1,127.83
-515.13
5,948,437.97
1,678,552.95
Point22
0.00
925.99
-550.20
5,948.235.97
1,678,518.95
Point23
0.00
592.57
-475.94
5,947,902.98
1,678,594.97
Point24
0.00
390.71
-316.98
5,947,701.98
1,678,754.98
Point25
0.00
354.47
-81,15
5,947,667.00
1,678,990.98
Point26
0.00
0.00
0.00
5,947,313.00
1,679,074.00
1 L-151-1-01_T01 0.00 0.00 5.938.00-7,167.421,139,081.91 5,947,456.00
1,678,915.00
70' 1' 2.283 N 140' 32' 55.661 W
plan misses target center by 1140198.60usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Point
1 L-151-1-01_TO5 0.00 0.00 5,969.00-8,065.351,138,297.06 5,946,554.00
1.678,135.00
70' 0' 54.715 N 140° 33' 21.790 W
plan misses target center by 1139419.05usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Point
1L-151-1_Fault2_M 0.00 0.00 0.00-5,758.571,138,763.35 5,948,863.00
1,678,589.00
700 1' 16.430 N 1400 32' 58.665 W
plan misses target center by 1139888.62usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Rectangle (sides W1,000.00 H1.00 D0.00)
1L-151-1-01_T07 0.00 0.00 5,979.00-8,598.881,138,196.22 5.946,020.00
1,678,037.00
70' 0' 49.682 N 140' 33' 26.938 W
plan misses target center by 1139321.69usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Point
1 L-151-1-01_T08 0.00 0.00 5,986.00-8.946.671,138,149.37 5,945,672.00
1,677,992.00
70' 0' 46.374 N 140' 33' 29.757 W
plan misses target center by 1139277.24usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Point
1 L-151-1-01_T06 0.00 0.00 5,971.00-8,320.101,138,243.71 5,946,299.00
1,678,083.00
700 0' 52,319 N 1400 33' 24.396 W
plan misses target center by 1139367.32usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Point
1L-15L1_Fault2 0.00 0.00 5,923.00-5,758.571,138,763.35 5,948,863.00
1,678,589.00
70' 1' 16.430 N 140' 32' 58.665 W
- plan misses target center by 1139873.17usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
- Polygon
Point 1 5,923.00 0.00 0.00 5.948,863.00
1,678,589.00
Point 5,923.00 1.00 1.00 5,948,864.01
1,678,589.99
1 L-151-1-01_Faultl 0.00 0.00 5,992.00-8,085.131,138,253.95 5.946,534.00
1,678,092.00
70' 0' 54.586 N 140° 33' 23.098 W
- plan misses target center by 1139376.07usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
- Polygon
Point 1 5,992.00 0.00 0.00 5,946,534.00
1,678,092.00
Point 5,992.00 1.00 1.00 5,946,535.01
1,678,092.99
1 L-151-1-01_T09 0.00 0.00 5,992.00-9,497.421,138,090.44 5,945,121.00
1,677,936.00
70° 0' 41.112 N 140' 33' 33.787 W
- plan misses target center by 1139222.34usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
- Point
1012512016 12:25:34PM Page 5 COMPASS 5000.1 Build 74
ConocoPhillips
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-15L1-01
Design:
1 L-15L1-01_wp03
Casing Points
Measured Vertical
Depth Depth
(usft) (usft)
9,300.00 6,000.70 2 3/8"
Plan Annotations
Measured
Vertical
Depth
Depth
(usft)
(usft)
6,540.00
5,936.16
6,610.00
5,932.34
6,760.00
5,925.48
6,960.00
5,925.48
7,110,00
5,929.04
7,310.00
5,938.52
7,610.00
5,956.57
7,850.00
5,966.77
8,050.00
5,969.17
8,150.00
5,970.37
8,275.00
5,974.34
8,375.00
5,979.49
8,575.00
5,986.40
8,725.00
5,989.02
9,025.00
5,994.28
9,300.00
6,000.70
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Casing
Hole
Diameter
Diameter
Name (in)
(in)
2.375
3.000
Local Coordinates
+Nl-S
+E/-W
(usft)
(usft)
Comment
-903.11
-1,099.47
TIP/KOP
-913.22
-1,168.61
Start 7 dls
-949.70
-1,313.73
3
-1,036.07
-1,493.57
4
-1,127.70
-1,612.01
5
-1,279.93
-1,740+61
6
-1,554.65
-1,855.49
7
-1,793.00
-1,872.01
8
-1,992.26
-1,881.56
9
-2,091.60
-1,892.44
10
-2,215.49
-1,907.59
11
-2,312+03
-1,93292
12
-2,507.56
-1,971.90
13
-2,655.24
-1,996,85
14
-2,952.66
-2,019.42
15
-3,225.79
-2,035.92
Planned TD at 9300.00
For .I
BAKER
HUGHES
1012512016 12:25:34PM Page 6 COMPASS 5000.1 Build 74
ConocoPhillips
ConocoPhillips (Alaska) Inc. -Kup2
Kuparuk River Unit
Kuparuk 1 L Pad
1 L-15
1 L-15L1-02
Plan: 1 L-15L1-02_wp00
Standard Planning Report
25 October, 2016
WE 0 ap I
BAKER
NIJGHES
10,1 ConocoPhillips FIF..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc.
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-1511-02
Design:
1 L-1 5L1-02_wp00
Local Co-ordinate Reference:
Kup2 TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1 L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Project Kuparuk River Unit, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
Site
Kuparuk 1 L Pad
Site Position:
Northing:
5,949,190.90usft Latitude:
700 16' 19.650 N
From:
Map
Easting:
539,916.78 usft Longitude:
149° 40' 37.763 W
Position Uncertainty:
0.00
usft Slot Radius:
0.000 in Grid Convergence:
0.30
J
—
-
I Well
1 L-15
Well Position
+N/-S
0.00 usft Northing:
5,948,581.09 usft Latitude:
70° 16' 13.652 N
+E/-W
0.00 usft Easting:
539,922.94 usft Longitude:
1490 40' 37.678 W
Position Uncertainty
0.00 usft Wellhead Elevation:
usft Ground Level:
83.20 usft
Wellbore
1 L-15L1-02
Magnetics
Model Name
Sample Date
Declination Dip Angle
Field Strength
(nT)
BG G M 2016
12/1 /2016
17.86 80.91
57,543
Design
1L-15L1-02_wp00
Audit Notes:
Version:
Phase: PLAN
Tie On Depth:
6,380.00
Vertical Section:
Depth From (TVD)
+N/-S +E/-W
Direction
(usft)
(usft) (usft)
(°)
-83.20
0.00 0.00
0.00
1012512016 12:27.12PM Page 2 COMPASS 5000.1 Build 74
- ConocoPhillips FS..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-15L1-02
Design:
1 L-15L1-02_wp00
Local Co-ordinate Reference
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Plan Sections
Measured
TVD Below
Dogleg
Build
Turn
Depth
Inclination
Azimuth
System
+N/-S
+E/-W
Rate
Rate
Rate
TFO
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(°/100ft)
(°/100ft)
(°/100ft)
(°) Target
6,380.00
56.21
232.71
5,912.65
-826.65
-966.98
0.00
0.00
0.00
0.00
6,450.00
84.21
232.71
5,936.11
-866.16
-1,018.86
40.00
40.00
0.00
0.00
6,630.00
90.11
304.60
5,946,42
-869.79
-1,186,89
40.00
3.28
39.94
88.00
6,700.00
90.53
309.48
5,946.03
-827.63
-1,242.75
7.00
0.61
6.97
85.00
6,770.00
90.53
314.38
5,945.38
-780.87
-1,294.80
7.00
0.00
7.00
90.00
6,870.00
87.03
320.45
5,947.51
-707.30
-1,362.41
7.00
-3.50
6.07
120.00
1 6,995.00
91.42
328.02
5,949.19
-605.97
-1,435.38
7.00
3.51
6.06
60.00
7,095.00
97.15
332.06
5,941.72
-519.64
-1,485.16
7.00
5.73
4.04
35.00
7,195.00
94.71
338.66
5,931.38
-429.28
-1,526.58
7.00
-2.44
6.60
110.00
7,295.00
93.71
345.61
5,924.03
-334.41
-1,557+15
7.00
-1.01
6.95
98.00
7,455.00
93.63
356.83
5,913.76
-176.87
-1,581.49
7.00
-0.04
7.01
90.00
8,065.00
89.29
39.33
5,897.44
389.40
-1,396.36
7.00
-0.71
6.97
95.00
8,365+00
89.34
18.33
5,901.08
650.71
-1,252.49
7.00
0.02
-7.00
-90.00
8,440.00
84.40
16.53
5,905.17
722.14
-1,230.07
7.00
-6.58
-2.40
-160.00
8,515.00
88.96
13.91
5,909.51
794.36
-1,210.42
7.00
6.07
-3.50
-30.00
8,630.00
91.04
6.13
5,909.52
907.51
-1,190.43
7.00
1.81
-6.76
-75.00
8,700.00
90.61
11.01
5,908.51
976.70
-1,179.99
7.00
-0.61
6.97
95.00
8,825.00
87.62
2.79
5,910+43
1,100.66
-1,164.99
7.00
-2.39
-6.58
-110.00
8,950.00
87.65
11.55
5,915.60
1,224.46
-1,149.42
7.00
0.02
7.01
90.00
9,100.00
79.08
5.44
5,932.93
1,371.60
-1,127+38
7.00
-5.71
-4.07
-145.00
9,250.00
89.58
5.44
5,947.73
1,519.99
-1,113+26
7.00
7.00
0.00
0.00
9,430.00
97.65
15.14
5,936.37
1,696+40
-1,081.31
7.00
4.48
5.39
50.00
9,580.00
92.32
6.05
5,923.32
1,843.08
-1,053.91
7.00
-3.55
-6.06
-120.00
9,680+00
88.82
12.11
5,922.33
1,941.76
-1,038.13
7.00
-3.51
6.06
120.00
9,880.00
88.85
358.11
5,926.42
2,140.43
-1,020.36
7.00
0.02
-7.00
-90.00
10,200.00
88.94
20.52
5,932.68
2,454.14
-968.91
7.00
0.03
7.00
90.00
1012512016 12:27:12PM Page 3 COMPASS 5000.1 Build 74 1
ConocoPhillips NA, kI
ConocoPhillips Planning Report RAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1 L-15
Company:
ConocoPhillips (Alaska)
Inc. -Kup2
TVD Reference:
Mean
Sea Level
Project:
Kuparuk River Unit
MD Reference:
1 L-15
@ 118.00usft (Parker 141)
Site:
Kuparuk 1 L Pad
North Reference:
True
Well:
1L-15
Survey Calculation Method:
Minimum Curvature
Wellbore:
1 L-15L1-02
Design:
1 L-15L1-02_wp00
Planned Survey
Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth
Inclination
Azimuth
System
+N/-S
+E/-W
Section
Rate
Azimuth
Northing
Easting
(usft)
(1)
(1)
(usft)
(usft)
(usft)
(usft)
(°/100ft)
r)
(usft)
(usft)
6,380.00
56.21
232.71
5,912.65
-826.65
-966.98
-826.65
0.00
0.00
5,947,749.41
538,960.46
TIP
6,450.00
84.21
232.71
5,936.11
-866.16
-1,018.86
-866.16
40.00
0.00
5,947,709.63
538,908.79
KOP
6,630.00
90.11
304.60
5,946.42
-869.79
-1,186.89
-869.79
40.00
88.00
5,947,705.11
538,740.80
Start 40 dls
6,700.00
90.53
309.48
5,946.03
-827.63
-1,242.75
-827.63
7.00
85.00
5,947,746.96
538,684.72
End 40
dls, Start 7 dis
6,770.00
90.53
314.38
5,945.38
-780.87
-1.294.80
-780.87
7.00
90.00
5,947,793.44
538,632.43
5
6,870.00
87.03
320.45
5,947.51
-707.30
-1,362.41
-707.30
7.00
120.00
5,947,866.64
538,564.43
6
6,995.00
91.42
328.02
5,949.19
-605.97
-1,435.38
-605.97
7.00
60.00
5,947,967.57
538,490.93
7
7,095.00
97.15
332.06
5.941.72
-519.64
-1,485.16
-519.64
7.00
35.00
5,946,053.64
538,440.71
8
7,195.00
94.71
338.66
5,931.38
-429.28
-1,526.58
-429.28
7.00
110.00
5,948,143.76
538,398.81
9
7,295.00
93.71
345.61
5,924.03
-334.41
-1,557.15
-334.41
7.00
98.00
5,948,238.45
538,367.74
10
7,455.00
93.63
356.83
5,913.76
-176.87
-1,581.49
-176.87
7.00
90.00
5.948,395.85
538,342.57
11
8,065.00
89.29
39.33
5,897.44
389.40
-1,396.36
389.40
7.00
95.00
5,948,963.04
538,524.68
12
8,365.00
89.34
18.33
5,901.08
650.71
-1,252.49
650.71
7.00
-90.00
5,949,225.09
538,667.14
13
8,440.00
84.40
16.53
5,905.17
722.14
-1,230.07
722.14
7.00
-160.00
5.949,296.62
538,689.18
14
8,515.00
88.96
13.91
5,909.51
794.36
-1,210.42
794.36
7.00
-30.00
5,949,368.94
538,708.44
15
8,630.00
91.04
6.13
5,909.52
907.51
-1,190.43
907.51
7.00
-75.00
5,949,482.19
538,727.83
16
8.700.00
90.61
11.01
5,908.51
976.70
-1,179.99
976.70
7.00
95.00
5,949.551.42
538,737.90
17
8,825.00
87.62
2.79
5,910.43
1,100.66
-1,164.99
1.100.66
7.00
-110.00
5,949,675.45
538.752.25
18
8,950.00
87.65
11.55
5,915.60
1.224.46
-1,149.42
1,224.46
7.00
90.00
5.949,799.31
538,767.16
19
9,100.00
79.08
5.44
5,932,93
1,371.60
-1,127.38
1,371.60
7.00
-145.00
5,949,946.56
538,788.41
20
9,250.00
89.58
5.44
5,947.73
1,519.99
-1,113.26
1,519.99
7.00
0.00
5,950,095.00
538.801.74
21
9,430.00
97.65
15.14
5,936.37
1,696.40
-1,081.31
1,696.40
7.00
50.00
5,950,271.56
538,832.76
22
9.580.00
92.32
6.05
5,923.32
1,843.08
-1,053.91
1,843.08
7.00
-120.00
5,950,418.37
538,859.37
23
9,680.00
88.82
12.11
5,922.33
1,941.76
-1,038.13
1,941.76
7.00
120.00
5.950,517.12
538,874.63
24
9,880.00
88.85
358.11
5,926.42
2,140.43
-1,020.36
2,140.43
7.00
-90.00
5.950,715.86
538.891.34
25
10,200.00
88.94
20.52
5,932.68
2,454.14
-968.91
2,454.14
7.00
90.00
5,951,029.82
538,941.12
1012512016 12:27:12PM
Page 4
COMPASS 5000.1 Build 74
ConocoPhillips
Database: EDM Alaska NSK Sandbox
Company: ConocoPhillips (Alaska) Inc. -Kup2
Project: Kuparuk River Unit
Site: Kuparuk 1 L Pad
Well: 1L-15
Wellbore: 1 L-1511-02
Design: 1 L-151-1-02_wp00
Planned Survey
Measured TVD Below
Depth Inclination Azimuth System
(usft) (a) (1 (usft)
Planned TD at 10200.00
ConocoPhillips
Planning Report
Local Co-ordinate Reference
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1 L-15
Mean Sea Level
1L-15 @ 118.00usft (Parker141)
True
Minimum Curvature
Vertical Dogleg Toolface
+N/-S +E/-W Section Rate Azimuth
(usft) (usft) (usft) (°/100ft) (I
Map
Northing
(usft)
E k I
BAKER
HUGHES
Map
Easting
(usft)
1012512016 12:27:12PM Page 5 COMPASS 5000.1 Build 74
V,. ConocoPhillips WE..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1L Pad
Well:
1L-15
Wellbore:
1 L-15L1-02
Design:
1 L-15L1-02_wp00
Targets
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1 L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Target Name
hit/miss target Dip Angle Dip Dir. TVD +N!-S +E/-W Northing Easting
Shape (1) (1) (usft) (usft) (usft) (usft) (usft)
1L-1511_Fault3 0.00 0.00 5,941.00-5,360.221,138.894.48 5,949,262.00
- plan misses target center by 1139870.47usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
- Polygon
Point 1 5,941.00 0.00 0.00 5,949,262.00
Point 5,941.00 1.00 1.00 5,949,263.01
1L-151-1_Faultl_M 0.00 0.00 0.00-6,611.351,138,514.80 5,948,009.00
- plan misses target center by 1139511.80usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
- Rectangle (sides W1,000.00 1-11.00 D0.00)
11--151-1-01_Faultl_M 0.00 0.00 0.00-8,085.131,138,253.95 5,946,534.00
plan misses target center by 1139259.40usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
Rectangle (sides W1,000.00 1-11.00 D0.00)
1L-151-1_Faultl 0.00 0.00 5,928.00-6,611.351,138,514.80 5,948,009.00
plan misses target center by 1139496.46usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
Polygon
Point 1 5,928.00 0.00 0.00 5,948,009.00
Point 5,928.00 1.00 1.00 5,948,010.01
1L-151-1-02_T01 0.00 0.00 5,933.00-3,842.441,139,157.56 5,950,781.00
- plan misses target center by 1140128.52usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
- Point
1 L-15 CTD Polygon Sou
0.00 0.00 0.00
-7,318.271,139,240.13
5,947,306.00
- plan misses target center by 1140240.92usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
Polygon
Point 1
0.00
0.00
0.00
5,947,306.00
Point
0.00
-130.08
-368.72
5,947,173.98
Point
0.00
-192.21
-536.07
5,947,110.97
Point 4
0.00
-378.39
-696.07
5,946,923.96
Point 5
0.00
-580.00
-774.13
5,946,721.96
Point 6
0.00
-898.95
-789.81
5,946,402.96
Point?
0.00
-1,245.77
-832.64
5,946,055.95
Point 8
0.00
-1,641.47
-897.72
5,945,659.95
Point 9
0.00
-2,231.27
-948.83
5,945,069.95
Point 10
0.00
-2,488.29
-950.18
5,944,812.95
Point 11
0.00
-2,403.13
-1.359.78
5,944,895.93
Point 12
0.00
-1,903.52
-1,274.14
5,945,395.94
Point 13
0.00
-1,438.66
-1,236.70
5,945,860.94
Point 14
0.00
-827.83
-1,191.48
5,946,471.94
Point 15
0.00
-418.01
-1,148.32
5,946,881.95
Point 16
0.00
-112.79
-993.70
5,947,187.95
Point 17
0.00
135.99
-756.37
5,947,437.96
Point 18
0.00
266.58
-484.65
5,947,569.98
Point 19
0.00
368.47
-81.07
5,947,674.00
Point 20
0.00
0.00
0.00
5,947,306.00
1,678,718.00
1, 678, 718.00
1, 678, 718.99
1, 678, 345.00
1, 678, 092.00
1, 678, 345.00
1,678.345.00
1, 678, 345.99
1, 678, 973.00
1, 679, 074.00
1,679.074.00
1,678,706.01
1, 678, 539.01
1, 678, 380.02
1, 678, 303.03
1, 678, 289.05
1, 678, 248.06
1,678,185.09
1,678,137.11
1,678,137.12
1,677,727.12
1, 677, 810.10
1, 677, 845.07
1, 677, 887.04
1, 677, 928.03
1,678,081.01
1,678, 316.99
1,678.587.99
1,678.990.98
1, 679, 074.00
Latitude Longitude
70° V 20.105 N 140° 32' 53.233 W
70' 1' 8.514 N 140° 33' 9.378 W
70° 0' 54.586 N 140° 33' 23.098 W
70'V8.514N 140' 33'9.378 W I
700 1' 34.456 N 1400 32' 39.250 W
70° 1' 0.586 N 140° 32' S1.816 W I
1 L-15L1_Fault3_M 0.00 0.00
0.00
-5,360.221.138,894.48
5,949,262.00
1,678,718.00 700 1' 20.105 N 1400 32' 53.233 W
plan misses target center by 1139885.81 usft at
6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
Rectangle (sides W1,000.00 111.00 D0.00)
1L-15 CTD Polygon Nora 0.00 0.00
0.00
-7,311.271,139,240.17
5,947,313.00
1,679,074.00 700 1' 0.654 N 1400 32' 51.785 W
- plan misses target center by 1140240.92usft at
6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
- Polygon
Point 1
0.00
0.00 0.00
5,947,313.00
1,679,074.00
Point
0.00
-75.99-194.42
5,947,235.99
1,678,880.00
Point
0.00
9.52-479.00
5,947,319.98
1,678,595.00
Point4
0.00
246.78-713.78
5,947.555.97
1,678,358.99
Point
0.00
622.80-899.83
5,947,930.96
1,678,170.97
Point
0.00
977.12-952.97
5,948,284.96
1,678,115.95
1012512016 12:27:12PM Page 6 COMPASS 5000.1 Build 74
ConocoPhillips
ConocoPhillips
Planning Report
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Project:
Kuparuk River Unit
MD Reference:
Site:
Kuparuk 1L Pad
North Reference:
Well:
1 L-15
Survey Calculation Method:
Wellbore:
1 L-151-1-02
Design:
1 L-15L1-02_wp00
Point
0.00
1,261.70
-868.47
5.948.569.95
Point
0.00
1,648.28
-588.41
5,948,957.97
Point 9
0.00
2,418.87
-494.35
5,949,728.98
Point 10
0.00
2,759.46
-409.55
5.950,069.98
Point 11
0.00
3,417.93
-294.08
5,950.728.99
Point 12
0.00
3,660.55
-216.80
5,950,971.99
Point 13
0.00
3,645.42
-1.85
5,950,958.00
Point 14
0.00
3,423.14
45.99
5,950,736.00
Point 15
0.00
3,069.33
2.12
5.950,382.00
Point 16
0.00
2,715.70
-75.74
5,950.027.99
Point 17
0.00
2,403.12
-161.39
5,949,714.99
Point 18
0.00
2,077.02
-149.11
5,949,389.00
Point 19
0.00
1,765.13
-177.75
5.949,076.99
Point20
0.00
1,459.80
-311.37
5,948,770.98
Point21
0.00
1,127.83
-515.13
5,948,437.97
Point 22
0.00
925.99
-550.20
5,948,235.97
Point 23
0.00
592.57
-475.94
5,947,902.98
Point 24
0.00
390.71
-316.98
5,947,701.98
Point25
0.00
354.47
-81.15
5,947.667.00
Point 26
0.00
0.00
0.00
5,947.313.00
11--151-1 Fault2 M 0.00 0.00
0.00
-5,758.571,138,763.35
5,948,863.00
plan misses target center by 1139756.33usft
at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
Rectangle (sides W1,000.00 H1.00 D0.00)
1L-15L1_Fault2 0.00 0.00
5,923.00
-5,758.571,138,763.35
5,948,863.00
plan misses target center by 1139741.00usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
Polygon
Point 1
5,923.00
0.00
0.00
5,948,863.00
Point 2
5,923.00
1.00
1.00
5,948,864.01
1L-151-1-01_Fault1 0.00 0.00
5,992.00
-8,085.131,138,253.95
5.946,534.00
plan misses target center by 1139244.06usft at 6380.00usft MD (5912.65 TVD,-826.65 N. -966.98 E)
Polygon
Point 1
5,992.00
0.00
0.00
5,946,534.00
Point 2
5,992.00
1.00
1.00
5,946,535.01
Casing Points
Measured Vertical
Depth Depth
(usft) (usft) Name
10,200.00 5,932.68 2 3/8"
Well 1 L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
1,678,198.94
1,678,476.91
1, 678, 566.88
1,678,649.86
1, 678, 761.82
1,678,837.81
1,679,052.82
1,679,101.83
1, 679, 059.84
1, 678, 983.86
1, 678, 899.88
1, 678, 913.89
1, 678, 886.91
1,678,754.92
1, 678, 552.95
1, 678, 518.95
1, 678, 594.97
1, 678, 754.98
1, 678, 990.98
1, 679, 074.00
1, 678, 589.00
ri.2
BAKER
HUGHES
70' 1' 16.430 N 140' 32' 58.665 W
1,678,589.00 70' 1' 16.430 N 140' 32' S8.665 W
1, 678, 589.00
1, 678, 589.99
1,678,092.00 70' 0' 54.586 N 140' 33' 23.098 W
1, 678, 092.00
1, 678, 092.99
Casing
Hole
Diameter
Diameter
(in)
(in)
2 375
3-000
1012512016 12:27:12PM Page 7 COMPASS 5000.1 Build 74
�-
ConocoPhillips
rS..
ConocoPhillips
Planning Report
BAKER
HUGHES
Database: EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1 L-15
Company: ConocoPhillips (Alaska) Inc. -Kup2
ND Reference:
Mean Sea Level
Project: Kuparuk River Unit
MD Reference:
1 L-15 @ 118.00usft (Parker 141)
Site: Kuparuk 1 L Pad
North Reference:
True
Well: 1L-15
Survey Calculation Method:
Minimum Curvature
Wellbore: 1 L-151-1-02
Design: 1 L-151-1-02_wp00
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/-S
+E/-W
(usft)
(usft)
(usft)
(usft)
Comment
6,380.00
5,912.65
-826.65
-966.98
TIP
6,450.00
5,936.11
-866.16
-1,018.86
KOP
6,630.00
5,946.42
-869.79
-1,186.89
Start 40dls
6,700.00
5,946.03
-827.63
-1,242.75
End 40 dls, Start 7 dls
6,770.00
5,945.38
-780.87
-1,294.80
5
6,870.00
5,947.51
-707.30
-1,362.41
6
6,995.00
5,949.19
-605.97
-1,435.38
7
7,095.00
5,941.72
-519.64
-1,485.16
8
7,195.00
5,931.38
-429.28
-1,526.58
9
7,295.00
5,924.03
-334.41
-1,557.15
10
7,455+00
5,913.76
-176.87
-1,581.49
11
8,065+00
5,897.44
389.40
-1,396.36
12
8,365.00
5,901.08
650.71
-1,252.49
13
8,440.00
5,905.17
722.14
-1,230.07
14
8,515.00
5,909.51
794.36
-1,210+42
15
8,630.00
5,909.52
907.51
-1,190.43
16
8,700+00
5,908.51
976.70
-1,179.99
17
8,825+00
5,910.43
1,100.66
-1,164.99
18
8,950.00
5,915.60
1,224.46
-1,149.42
19
9,100.00
5,932.93
1,371.60
-1,127.38
20
9,250.00
5,947.73
1,519.99
-1,113+26
21
9,430.00
5,936.37
1,696.40
-1,081.31
22
9,580+00
5,923.32
1,843.08
-1,053.91
23
9,680+00
5,922.33
1,941.76
-1,038.13
24
9,880.00
5,926.42
2,140.43
-1,020.36
25
10,200.00
5,932.68
2,454.14
-968.91
Planned TD at 10200.00
1012512016 12:27:12PM Page 8 COMPASS 5000.1 Build 74
�
1
W
-
N
=
_009.
__
Y
I
VIM
-
IT
�
Fv
ry
�
o
_
m
o
a
-
o
O
jo
�
p
�
rn E
rn� o Etj
-
o
r�
z
_•_
_
w
d
'
_
o
w
¢¢¢¢c
,
rn
p
a
—
r
N
O
r
r O
m `
<
_
Eul
x
jQ.
5
sr
7'y
m
C
yp
O
J
J
m
r
47
Z �Q
_
N.
-
I
r
�f a�
a
m
-
rm
� mmoa
I
0
4
�
N
_
_
O
-
O
N
b
tl
�
`
ro
V
N N
a O 7
..
C
v.
o
V
°
016,
o
0
I
t
0
o
�a
�
N
r
O
�
'
b
N
CACL
_
_
O
r
v
0
0
u
o
U
(utMsn oob) (+)t{uoN/(-)ulnoS
G
1
KUP PROD 1 L-15
LonocONhlllip5
Well Attributes
Max Angle & MD
TD
1
Alaska, Inc.
Wellbore API/UWI Fieltl Name Wellbore Status
nel C) MD (ftKB)
Act Sim (ftKB)
500292120400 KUPARUK RIVER UNIT PROD
46.58 6,700.00
6,705.0
-
Comment H2S (ppm) Date
50 12/21/2015
Annotation End Data
Last WO:
KB-Grd (ft) Rig Release Date
34.80 10/24/1984
1L-15, 10/1920162: 15:37 PM
-ral schematic actual
Annotation Depth (ftKB) End Date
Annotation
Last Mod By
End Dat¢
.._..._..__... _.....__.
_.. __
Last Tag SLM 6,372.0 4124/2015
Rev Reason: TAG, H25, GLV C/O, SET PLUG &
pproven
10/5/2016
CATCHER, CUT TUBING(3X)
Hamer:27.s
asmg r ngs
Casing Description OD
(in)
ID (in)
Top (ftKB)
Set Depth (ftKB)
Set Depth (TVD)...
e
Wt/Le#H450e
Top Thread
CONDUCTOR
16
15.060
35.0
102.0
102.0
0
WELDED
Casing Description OD
(in)
ID (in)
Top(ftKB)
Set Depth (ftKB) Set
Depth (ND)...
Wt/Lee
Top Thread
SURFACE
9518
8.921
34,3
3,475.0
3,474.7
BTC
Casing Description OD
(in)ID
(in)
Top (ftKB)
Sel Depth (ftKB) Set
Depth (TVD)...
Wt/Lee
Top Thread
PRODUCTION
7
6276
34.3
6,704.0
6,265.1
Tubing Strings
Tubing Description String
Ma...
ID (in)
Top (ftKB)
Set Depth (ft.-
Set Depth (TVD) (... Wt
(Ib/ft)
Grade
Top Connection
CONDUCTOR: 350-102.0
Upper Sele ctive 31/2
2.992
0.0
6, 285.3
5,962,4
9.30
L-80
EUE 8rd Mod
Completion
Completion Details
Top (ftKB)
Top (ND) (ftKB)
Top Incl (°)
Item Des
Com
Nominal 10
(in)
Mandrel; 2,42 4 5
27.6
27.6
0.00 Hanger
Tubing Hanger, FMC TC-to-EN, 7-1/16" x 3-1/2" EUE
8rd 2.950
Box x Box
SURFACE; 34.3-3,4750-
6,027.5
5,755.8
35.60 Locator
Locator Sub, Baker, GBH-22
3.000
6,028.5
5,756.6
35.56 Seal
Assembly
Seal Assembly, Baker, 80-40 (Seal Assy 21.54' Total
3.000
Length)
Mandrel; 3,494.0
6,035.3
5,762.2
35.26 Polished
Bore
PBR, Baker, 80-40 (shear release pinned at 40K)
4.000
Receptacle
6,079.6
5,798.4
35.44 Nipple
-DB,
X Nipple, HES, 2.813"
2.813
XN,
DS, D
Mandrel: 4,373,6
6,213.3
5,906.0
37.51 Carbide
Blast
Blast Joint. 9.3# L-80 3Y/ EUEM box x 3% HYD 511 pin
2.992
Rings
6,245.0
5,931.0
38.30 Carbide
Blast
Blastjoint 3%9.3# L-80 HYD 511 box x pin
2.992
Rings
Mandrel: s,osz.e
6,283.8
5,961.3
39.27 Locator
Locator Sub, Baker, GBH-22
3,000
6,284.3
5,961.E
39.28 1 Seal
Assembly
Seal Assembly, Baker, 80-40 (seal assembly 11.77')
3.000
Tubing Description String Ma... 10 (in) Top (ftKB) Set Depth (ft.. Set Depth (ND) (... Wt (IbMt) Grade Top Connection
Lower Completion 5.9E 2.992 6.285-3 6,345.4 6,008.4 8rd EUE
Mandrel; 5,594 6
Completion Details
Top (ftKB)
Top (ND) (ftKB)
Top Ind (°)
Item Des
Coro
Nominal ID
(in)
6,288.6
5,965.0
39.39 SBE
(Seal
Baker 80-4012.26'SBE
4.000
Bore
Mandrel: 5,970 ]
Extension)
6,307.8
5,979.7
39.86 Deployment
Upper Wedge Assembly #2
2.992
Sleeve
6,32t8
5,990.4
40.21 Nipple
-DB,
GX Nipple, HES, 2.813", SN: 7256
2.813
Locator; 6,02T5
XN,
DS, D
Seal Ass -by; 6,028.5
6,327.5
5,994.8
40.35 Deployment
Lower Wedge Assembly #1
2.992
Polistud Bore Race,--:,
Sleeve
6,035.3
6,341.5
6,005.4
40.69 Nipple
- DB,
GX Nipple, HES, 2.813" w/PXX plug and prong SN:
2.813
Packer (Tut, g)', 6,057.7
XN,
DS, D
6,344.9
6,008.0
40.77 Mule
Shoe
WLEG 4.57" OD x 3" ID. Drifted 2,91".
2.992
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (ND)
Top Incl
Mandrel; 6,122.9
Top (ftKB)
(ftKB)
N
Des
Can Run Date
ID (in)
6,480.0
6,108.0
43.44
Fish
Packer & tubing tail from 6313' milled and chased 10/11/2016
down to 6480'. Prior to Setting Tandem Wedge & F
Perm Packer
6,520.0
6,136.9
44.24
FISH
JK Running Tool 4.5" x 1.2" OD, lost 81241, 8/24/2004
Mandrel; 6.194.2
6,526.0
6,141.2
44.38
FISH
Parts of 2 Broken GL In Rathole; Also Trash around 2/14/1990
Mandrels
Carbide Blast Rings; 6,2133
Perforations & Slots
IPERF; 6,235.0-6,248.0--
Shot
IPERF; 6,248.0-6,268.0,-
Ca md. Blast Ri ngs; 6,245.0
Top (ftKB)
B[m (ftKB)
Top (ND) Blm
(ftKB)
(TVO)
(ftKB)
Zon¢
Dale
Dens
(shI)
t)
Type
Co.
6,235.0
6,248.0
5,923A
5,933.4 CA,
1 L-15
3/7/1985
12.0
IPERF 5" Scalloped
Guns, 120
deg. phasing
Locator; 6,283.8
6,248.0
6,268.0
5,933.4
5,949.0 C-4,
1 L-15
3/7/1985
12.0
IPERF 5" Scalloped
Guns, 120
Seal Assemby; 6.284.3
deg. phasing
Packer( Tubing); 6,285 3
58E (Seal Bore Extension);
6,393.0
6,416.0
6,044.1
6,061.2 A-5,
IL-15
3/7/1985
4.0
IPERF 4" JJ II,
phasing
120 deg.
s 2Be.s
%O Reducing (TUMrg); 6,298.0
Mandrel Inserts
St
ali
Depbymenl Sleeve; 6,30T8
on
N Top (ftKB)
Top (ND)
(ftKB)
Make Model
OD (in)
So,
Valve
Type
Latch Port
Type (in)
Size
TRO Run
(psi) Run
Date
Co.
1 2,424.5
2,424.3 Camco
MMG
11/2
DMY
10/14/2016
Nipple - DB, XN, DS, D; 6,321.8
2 3,494.0
3,493.7 Camoo
MMG
11/2
SOV
10/14/2016
Depby-nt Sleeve; 6,327.s
3 4,373.6
4,337.8 Camco
MMG
11/2
DMY
10/14/2016
Nipple - DB, XN, US, D; 61341.5
4 5,062.9
4,944.3 Camco
MMG
11/2
DMY
10/14/2016
Mule Since: 6,344.9
5 5,594.6
5,400.6 Camco
MMG
11/2
DMY
10/14/2016
IPERF; 6,393.0-6,416A
6 5,970.7
5,709.3 Camco
MMG
11/2
DMY
10114I2016
7 6,122.9
5,833.6 Camco
MMG
1112
DMY
10/14/2016
FISH; 6,520.0
8 6,194.2
5,890.8 Camco
MMG
11/2
DMY
10/14/2016
FISH; 6,526 0
PRODUCTION; 34.3-6,704.0
1 L-15 CTD Proposed Schematic
10' e2.F# 1-"C
shoe � 102' fdD
9-513' 360 J-55
shoe @ 34.5' MD
C4-sand perfs
6235-0268' MD
33C' MD praposeo
=.OWS depth
A5-sand petfs
6393-6410' MD
7' 26# J-65 shoe
@ MC MD
3-112" 9.3# L-80 EUE 8rd Tubing to surface
3-112" Camco gas lift mandrels @ TBD
Baker packer @ XXXX' MD
Production Mandrel at )0=' MD
Baker packer at XXXX MD (below C-sand perfs)
Baker SBE atXXXX' MD
3-1/2" X-nipple - lotxx' MD (2.812" min ID)
Northern Solutions WEDGE (see details)
1 L-15LI-02
M @ 102CCr MD
Liner top @ 632U MD
- �t-----------------
1L-15L1-01
M @ 9300' 1610
L'mer top gy� e380' R4D
1L-15L1
_ Q 10,200' MD
Liner Billet @ 6540' 1610
Baker Hughes INTEQ IGFAI
ConocoPhillips Travelling Cylinder Report BAKER
HUGHES
Company:
Project:
Reference Site:
Site Error:
Reference Well:
Well Error:
Reference Wellbore
Reference Design:
ConocoPhillips (Alaska) Inc. -Kup2
Kuparuk River Unit
Kuparuk 1 L Pad
0.00 usft
1 L-15
0.00 usft
1L-15L1-02
1 L-15L1-02_wp00
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 1 L-15
1L-15 @ 118.00usft (Parker 141)
1L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
1.00 sigma
OAKEDMP2
Offset Datum
Reference Depths are relative to 1 L-15 @ 118.00usft (Parker 141) Coordinates are relative to: 1 L-15
Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 Alaska Zone 4
Central Meridian is 150' 0' 0.000 W Grid Convergence at Surface is: 0.30 °
Ladder Plot
0 200D 4000 60M 8000 1000D 12D00
Meastred Depth
1 F-20,1 F-20,1 F-20 V 1
1 L-02,1 L-02,1 L-02 V 1
LEGEND
1 L-13,1 L-13A,1 L-13A VO
1 L-15,1 L-15,1 L-15 V3
1 L-15,1 1--151-1,1 L-15L1_wp02 V0
1L-15,1L-151-1-01,1L-151-1-01 wp03VO
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
10/25/2016 11:28.06AM Page 14 COMPASS 5000.1 Build 74
Baker Hughes INTEQ Has
ConocoPhillips Travelling Cylinder Report BAKER
HUGHES
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Reference Site:
Kuparuk 1 L Pad
Site Error:
0.00 usft
Reference Well:
1 L-15
Well Error:
0.00 usft
Reference Wellbore
1L-151-1-01
Reference Design:
1 L-15L1-01_wp03
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 1L-15
1L-15 @ 118.00usft (Parker141)
1L-15 @ 118.00usft (Parker141)
True
Minimum Curvature
1.00 sigma
OAKEDMP2
Offset Datum
Reference Depths are relative to 1 L-15 @ 118-00usft (Parker 141) Coordinates are relative to: 1 L-15
Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927, Alaska Zone 4
Central Meridian is 150° 0' 0.000 W Grid Convergence at Surface is: 0.30 °
Ladder Plot
1
900—
120
a
a)
07
c
v
U
0
a�
c
W
U
0 2000 4000 6000 8000 10000 12000
MeasLred Depth
LEGEND
6`— 1 L-13,1 L-13,1 L-13 V3 1 L-13,1 L-13AL1,1 L-13AL1 VO 1 L-15,1 L-151-1,1 L-15L1_wp02V0
1 L-13,1 L-13A,1 L-13A VO -i&- 1 L-15,1 L-15,1 L-15 V3 1 L-15,1 L-15L1-02,1 L-15L1-02vp00 VO
CC -Min centre to center distance or covergent point, SF -min separation factor, ES -min ellipse separation
10/25/2016 10:56:02AM Page 13 COMPASS 5000.1 Build 74
Baker Hughes INTEQ HIM
ConocoPhillips Travelling Cylinder Report BAKER
HUGHES
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Reference Site:
Kuparuk 1 L Pad
Site Error:
0.00 usft
Reference Well:
1 L-15
Well Error:
0.00 usft
Reference Wellbore
11--151-1
Reference Design:
1L-15L1_wp02
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 1 L-15
1L-15 @ 118.00usft (Parker 141)
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
1.00 sigma
OAKEDMP2
Onset Datum
Reference Depths are relative to 1 L-15 @ 118.00usft (Parker 141) Coordinates are relative to: 1 L-15
Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927, Alaska Zone 4
Central Meridian is 150' 0' 0.000 W Grid Convergence at Surface is: 0.30 °
Ladder Plot
i
1
----'---- - -- --- -----------
0
o -' - - - - -- -'----------'-------- -
-----
a)
U)
600�-
--- -- -
U
o
a)
ol
0 2000 4000 6000 8000 10000 12000
Mem ed Depth
LEGEND
1 L-02,1 L-02,1 L-02 V 1 1 L-15,1 L-15,11- 15 V3 1 L-15,1 L-15L1-02,1 L-15L1-02_v;M VO
1 L-13,1 L-13A,1 L-13A VO 1 L-15,1 L-15L1-01,1 L-15L1-01vpO3 VO
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
1012512016 10:40:40AM Page 13 COMPASS 5000.1 Build 74
Bettis, Patricia K (DOA)
From: Callahan, Mike S <Mike.Callahan@conocophillips.com>
Sent: Thursday, October 27, 2016 3:03 PM
To: Bettis, Patricia K (DOA)
Subject: RE: KRU 11--151-1: Permit to Drill Application
Attachments: 1L-15L1_wp02 VPO - NAD27.pdf; 1L-15L1-01_wp03 VPO - NAD27.pdf; 11--151-1-02
_wp00 VPO - NAD27.pdf
Good afternoon Patricia,
Please find the attached sectional plats for each of the three laterals. If you have any other questions or find anything
else missing, please let me know.
Thanks,
Mike
From: Bettis, Patricia K (DOA) [mailto:patricia.bettis@alaska.gov]
Sent: Thursday, October 27, 2016 2:56 PM
To: Callahan, Mike S <Mike.Callahan@conocophillips.com>
Subject: [EXTERNAL]KRU 1L-151-1: Permit to Drill Application
Good afternoon Mike,
A map showing the wellbore trajectory for the proposed KRU 1L-15L1 and other planned laterals was provided in the
permit to drill application. However, no sectional plats were provided for the wells. Please provide a sectional plat for
each proposed laterals. These may be sent to me and I'll place them within the appropriate applications.
Thank you,
Patricia
Patricia Bettis
Senior Petroleum Geologist
Alaska Oil and Gas Conservation Commission
333 West 71h Avenue
Anchorage, AK 99501
Tel: (907) 793-1238
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential
and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If
you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware
of the mistake in sending it to you, contact Patricia Bettis at (907) 793-1238 or patricia.bettis@alaska.gov.
TRANSMITTAL LETTER CHECKLIST
WELL NAME: M. �� L _ - /S j,
PTD: a / � - /3S-
✓ Development Service Exploratory Stratigraphic Test Non -Conventional
FIELD: AIV64J— POOL: /� I�f
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
/
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. a Rol — / R3 , API No. 50-�q- a�,og- 00 - pp.
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69)
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
- -� from records, data and logs acquired for well
(name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL - 490100
Well Name: KUPARUK RIV UNIT 1L-15L1 Program DEV _ _ Well bore seg ❑�/
PTD#: 2161350 Company CONOCOPHILLIPS ALASKA INC Initial Class/Type
DEV / PEND GeoArea 890 Unit 11160. ____ OnlOff Shore On Annular Disposal ❑
Administration 17
Nonconven, gasconformsto AS31,05:030Q.1_.A),(j.2.A-D)
NA_
1
Permitfeeattached - - - - - - - -
NA
- - - . - - - - - - - - - -
2
Lease number appropriate_
Yes
ADL0025659, entire wellbore.
3
Unique well name and number -
Yes
KRU 1 L-15L1 - - - - - - - - - - - - - ... _ _ . _ _ _ . - - - - - - - -
4
Well located in_a_defined -pool _ _ _
Yes
KUPARUK RIVER, KUPARUK-RIV OIL _- 490100,_governed by Conservation_ Order_N_o. 432D_
K-
5
Well -located proper distance from drilling unit -boundary
Yes
- CO 432D contains no spacing restrictions with respect to drilling unit boundaries. _ _ _ -
6
Well located proper distance from_ other wells - .. .
Yes
CO 432D has no interwell spacing_restrictions._--------------
17
Sufficient acreageavailable in drilling unit
Yes
I8
If deviated, is wellbore plat. included
Yes
I9
Operator only affected party_ - -
Yes -
Wellbore will be more than 500' from an external property line where_ ownership or landownership_ changes._ -
10
Operator has appropriate_ bond in -force ______
Yes
--------------- - - -_- - - - -_-
Appr Date
11
Permit_can be issued without conservation order. - - - . -
Yes -
12
Permit. can be issued_w_ithout administrative.approval
Yes
PKB 10/27/2016
- -
- - - - - -
13
-Can permit be approved before 15-day wait_
Yes _
14
Well.located within area and strata authorized by Injection Order # (put_10# in- comments) (For-
NA- -
- - - - - - - - - - - - - - -----------------------------------------------
15
All wells_ within _114_mile _area_of review identified (For service well only)- - - _
NA_
16
Pre -produced injector: duration -of pre production Less_ than 3 months_ (For -service well only)
N_A_
118
Conductor string -provided - - - - - - - - - - - - - - - _ - - - - - - - - - - - - - - - - - - - - -
NA_ -
- Conductor set_ in 1 L-15 parent well.
Engineering
I19
Surface casing_ protects all known USDWs - - - - - - - - - _ _ _ -. - - - - - -
N_A_
Surface casing set in 1-L-1.5_
20
CMT_vol adequate to circulate -on conductor & surf_csg - - - - - - - - - - - - - - - - - - - - - -
NA_ -
_ - _ - _ - _ _ .. - - - - _ - - - - - - . - - .. - - . - _ -
21
CMT_voi adequate -to tie -in -long string to -surf csg_ - - - _ - _ - -- ---
NA_ .
_ _ _ _ - . . - -
22
CMT_will coverall known -productive horizons_ -
Yes -
. - - _ - Setting-2 3/8" slotted_ liner_in a11_ later _al_s, No cement.
23
Casing designs adequate for C,_T, B &_ permafrost- - - - - - - - - - - - - - _ - - -
Yes
No press ure_differential on slotted liners- - - - - - - - - - - - -
24
Adequatetankage_or reserve pit - - - - - - - -
Yes
All waste -to be transported to approved_disposal wells.. Cutting -to DS4 G_&_ 1_
25
If a_ re -drill, has a 10-403 for abandonment been approved . - -
NA-
Well not abandoned.. Laterals out of parent wellbore._
26
Adequate wellbore separation -proposed -----------
Yes
Proximity analysis performed_.._No_issues. - - - -- - -- -
27
If_diverter required, does it meet_ regulations_ - - - - - - - - - - -
NA_
Wellhead in place ..BOPE will be used to drill well. -
Appr Date
28
Drilling fluid_ program schematic_& equip list -adequate_ - - - - - -Yes
-
- - - - - _Max formation_ pressure =-3702 psi (12.1 ppg EMW) Will drill with 8,6_ppg mud but maintain 1.1.8 ppg with MPD_ -
GLS 11/10/2016
29
BOPEs,_do-they meet regulation - - - -
Yes .
- - CDR3 has 5000 psi BOPE - - - - - - - - - - - - - - - - - - - - -
30
BOPE press rating appropriate; test to -(put psig in comments)_ - - - - - - _ _ _ - - - -
Yes -
- - MASP = 311.4_p_si_ Will -test BOPE tot 3500_psi_ - - - - - - - - - - - - - - - - - - - - - - - - - - -
31
Choke manifold complies w/API_ RP-53 (May 84)- - - - - - - - - - - - - -
Yes
32
Work will occur without operation shutdown - - - -
Yes
33
Is presence_ of H2S gas- probable - - - - - - -
Yes -
H2S on pad._ Rig_has sensors and_ alarms
34
Mechanical_condition of wells within AOR verified (For_service well only) _ - - - -
NA_
35 Permit can be issued w/o hydrogen- sulfide measures - - - - No WelIs_on_1L-Pad are_H2S-bearing._ H2S measures required. - - -
Geology 36 Data -presented on potential overpressure zones - - - - - - Yes - - - - - - - Maximum potential-res_ervoir pressure_ is 12.1 ppg_EMW;_will be drilled_ using 8.6_ppg mud and MPD technique.
Appr Date 37 Seismic_ analysis_ of shallow gas -zones- - - - - - - - - NA - - - - - - - - - - - - - - - - - - - -
PKB 10/27/2016 38 Seabed condition survey -(if off -shore) - - - - - - - . - - - - - - - - - _ - - NA- -
39 Contact name/phone for weekly_ progress reports_ [exploratory only] NA- - - _ .. - Onshore development lateral to be drilled_.
-
Geologic Engineering Public 1 L-151-1 is first lateral out of the parent wellbore. Targeting A4/A5 sand north of existing BHL. GIs
Commissioner: Date: Commissioner: Date C Date