From: Guhl, Meredith D (DOA)
Sent: Monday, November 26, 2018 9:37 AM
To: 'Callahan, Mike S'
Cc: Loepp, Victoria T (DOA); Boyer, David L (DOA)
Subject: KRU 1L-15 L1, L1-01, L1-02 PTDs 216-135, 216-136, 216-138, Permits Expired
Hello Mike,
The following Permits to Drill, issued to ConocoPhillips Alaska, have expired under Regulation 20 AAC 25.005 (g). The
PTDs will be marked expired in the AOGCC database.
• KRU 1L-15 L1, PTD 216-135, Issued 18 November 2016
• KRU 1L-15 L1-01 PTD 216-136, Issued 18 November 2016
• KRU 1L-15 1-1-02, PTD 216-138, Issued 18 November 2016
If you have any questions, please contact me.
Thank you,
Meredith
Meredith Guhl
Petroleum Geology Assistant
Alaska Oil and Gas Conservation Commission
333 W. 7th Ave, Anchorage, AK 99501
meredith.guhl@alaska.gov
Direct: (907) 793-1235
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.
The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail,
please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at
907-793-1235 or meredith.guhl@alaska.gov.
THE STATE
V 0 A 1
411151 WAMID
GOVERNOR BILL WALKER
Gary Eller
CTD Team Lead
ConocoPhillips Alaska, Inc.
P.O. Box 100360
Anchorage, AK 99510-0360
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.olasko.gov
Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1 L-15L 1-02
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 216-138
Surface Location: 387' FNL, 143' FEL, SEC. 31, T11N, RI OE, UM
Bottomhole Location: 3213' FNL, 1103' FEL, SEC. 30, T11N, RI OE, UM
Dear Mr. Eller:
Enclosed is the approved application for permit to re -drill the above referenced development well.
The permit is for a new wellbore segment of existing well Permit No. 184-183, API No. 50-029-
21204-00-00. Production should continue to be reported as a function of the original API number
stated above.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Daniel T. Seamount, Jr.
Commissioner
DATED this day of November, 2016.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
OCT 27 2016
G CC C-D113
1a. Type of Work:
1b. Proposed Well Class: Exploratory - Gas
❑ Service - WAG Service - Disp
1c. Specify if well is proposed for:
Drill ❑ I Lateral [I
Stratigraphic Test ❑ Development - Oil
❑Q Service - Winj ❑ Single Zone
e
Coalbed Gas ❑ Gas Hydrates ❑
Redrill ❑ Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone
Geothermal ❑ Shale Gas ❑
2. Operator Name:
ConocoPhillips Alaska Inc
5. Bond: Blanket Q . Single Well ❑
Bond No. 5952180
11. Well Name and Number:
1 L-15L1-02
3. Address:
6. Proposed Depth:
12. Field/Pool(s):
P.O. Box 100360 Anchorage, AK 99510-0360
MD: 10200' • TVD 5933'
Kuparuk River Field /
Kuparuk Oil Pool
4a. Location of Well (Governmental Section):
Surface: 387' FNL, 143' FEL, Sec 31, T11N, R10E, UM �
7. Property Designation (Lease Number):
ADL 25659 '
8. Land Use Permit:
13. Approximate Spud Date:
Top of Productive Horizon:
1192' FNL, 1084' FEL, Sec 31, T11N, R10E, UM
ALK 2585
11/4/2016
Total Depth:
9. Acres in Property:
14. Distance to Nearest Property:
3213' FNL, 1103' FEL, Sec 30, T11 N, R10E, UM
2490 .
16000'
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL (ft):
118'
15. Distance to Nearest Well Open
Surface: x- 539923 y- 5949191 Zone- 4
GL Elevation above MSL (ft): W
3ZIA
to Same Pool: 136' (1 L-02)
16. Deviated wells: Kickoff depiRMO feet
17. Maximum Potential Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 98 degrees .
Downhole: 3702 % Surface: 3114 -
18. Casing Program:
Specifications
Top - Setting Depth - Bottom
Cement Quantity, c.f. or sacks
Hole
Casing
Weight
Grade
Coupling
Length
MD
TVD
MD
TVD
(including stage data)
' 3"
2-3/8"
4.7#
L-80
ST-L
3875'
6325'
5879'
10200'
5933'
N/A
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft):
Total Depth TVD (ft):
Plugs (measured):
Effect. Depth MD (ft):
Effect. Depth TVD (ft):
Junk (measured):
6705'
6266'
N/A
6704'
6265'
Fish - 6480'
Casing
Length
Size
Cement Volume
MD
ND
Conductor/Structural
102'
16"
214 sx Cold Set II
102'
102'
Surface
3475'
9-5/8"
1025 sx AS II I & 700 sx Class G
3475'
3475'
Intermediate
Production
6704'
7"
275 sx Class G & 250 sx AS 1
6704'
6265'
Liner
Perforation Depth MD (ft): 6235' - 6268'
Perforation Depth TVD (ft):
5923' - 5949'
6393' - 6416'
6044' - 6061'
20. Attachments: Property Plat ❑ BOP Sketch ❑
Drilling Program Q Time v. Depth Plot
❑ Shallow Hazard Analysis❑
Diverter Sketch ❑
Seabed Report ❑ Drilling Fluid Program
Q 20 AAC 25.050 requirements❑✓
21. Verbal Approval: Commission Representative:
Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Mike Callahan 263-4180
Contact
Email mike.callahan()cop.com
Printed Nam Gary Eller
Title CTD Team Lead
Signature
Phone Z - \ Z
Date
Commission Use Only
Permit to Dri
Number:
API Number:
50-11
02 —0(,) 1
Permit Approval
Date: // I���
See cover letter for other
requirements.
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methan gas hydrates, or gas contained in shales:
Other: 3506 ,d S,' 00/ c'S� Samples req'd: Yes ❑, No 1M Mud log req'd: Yes❑iNov
�'f / ,qe �r J [ b J HZS measures: Yes Lr�J-� No❑, Directional svy req'd: Yes rLJ� No
/tZo, l4_r�❑ L Spacing exception req'd: Yes NoLrLr�l Inclination -only svy req'd: Yes ❑ Nov
r eL �— 71r' R lla 1<,� �+r ,`n CL r, ,� Post initial injection MIT req'd: Yes❑ No❑
APPROVED BY
Approved by:
COMMISSIONER THE COMMISSION Date:
Form 10-401 Revised 11/2015)
0RIGINAL
Submit Form and
This permit is v lid f r 24 months from the dat of approval (20 AAC 25.005(g)) Attachments in Duplicate
� 1� t1gi- � ��
Q
ConocoPhilli s
p
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
October 26, 2016
Commissioner - State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Dear Commissioner:
ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill 3 laterals out of the Kuparuk Well 1 L-
15 using the coiled tubing drilling rig, Nabors CDR3-AC.
To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC
25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being
limited to 500' from the original point.
Attached to this application are the following documents:
— 10-401 Applications for 1L-15L1, 1L-151_1-01, and 1L-15L1-02
— Detailed Summary of Operations
— Directional Plans for 1 L-15L1, 1 L-151_1-01, and 1 L-151_1-02
— Proposed CTD Schematic
If you have any questions or require additional information, please contact me at 907-263-4180
Sincerely,
Mike Callahan
ConocoPhillips Alaska
Coiled Tubing Drilling Engineer
Kuparuk CTD Laterals HAeoa� KA
1 L-151-19 1 L-151-1-01 & 1 L-151-1-02 CD?9
Application for Permit to Drill Document 2RC
1.
Well Name and Classification...........................................................................................................2
(Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b))......................................................................................................................2
2.
Location Summary.............................................................................................................................2
(Requirements of 20 AAC 25.005(c)(2))......................................................................................................................................................2
3.
Blowout Prevention Equipment Information...................................................................................2
(Requirements of 20 AAC 25.005(c)(3)).....................................................................................................................................................2
4.
Drilling Hazards Information and Reservoir Pressure....................................................................2
(Requirements of 20 AAC 25.005(c)(4)).....................................................................................................................................................2
5.
Procedure for Conducting Formation Integrity tests.....................................................................2
(Requirements of 20 AAC 25.005(c)(5))......................................................................................................................................................2
6.
Casing and Cementing Program......................................................................................................3
(Requirements of 20 AA C 25.005(c)(6))....................................................................................................................................................
- 3
7.
Diverter System Information.............................................................................................................3
(Requirements of 20 AAC 25.005(c)(7))......................................................................................................................................................3
8.
Drilling Fluids Program.....................................................................................................................3
(Requirements of 20 AAC 25.005(c)(8)).................................................................................................................................................3
9.
Abnormally Pressured Formation Information...............................................................................4
(Requirements of 20 AAC 25.005(c)(9))......................................................................................................................................................4
10.
Seismic Analysis.................................................................................................................................4
(Requirements of 20 AAC 25.005(c)(10))....................................................................................................................................................
4
11.
Seabed Condition Analysis...............................................................................................................4
(Requirements of 20 AAC 25.005(c)(11))....................................................................................................................................................4
12.
Evidence of Bonding.........................................................................................................................4
(Requirements of 20 AAC 25.005(c)(12))....................................................................................................................................................4
13. Proposed Drilling Program...............................................................................................................4
(Requirements of 20 AAC 25.005(c)(13))....................................................................................................................................................4
Summaryof Operations.................................................................................................................................................. 4
LinerRunning.................................................................................................................................................................. 6
14. Disposal of Drilling Mud and Cuttings.............................................................................................6
(Requirements of 20 AAC 25.005(c)(14))....................................................................................................................................................6
15. Directional Plans for Intentionally Deviated Wells..........................................................................6
(Requirements of 20 AAC 25.050(b)).......................................................................................................................................................... 6
16. Attachments.......................................................................................................................................6
Attachment 1: Directional Plans for 1L-15L1, 1L-151-1-01 & 1L-15L1-02 laterals........................................................... 6
Attachment 2: Current Well Schematic for 1 L-15........................................................................................................... 6
Attachment 3: Proposed Well Schematic for 1 L-15L1, 1 L-15L1-01 & 1 L-15L1-02 laterals ............................................. 6
Page 1 of 6 October 26, 2016
PTD Application: 1 L-151-1, 1 L-151-1-01 & 1 L-151-1-02
1. Well Name and Classification
(Requirements of 20 AAC 25.005(t) and 20 AAC 25.005(b))
The proposed laterals described in this document are 1 L-15L1, 1 L-15L1-01 & 1 L-15L1-02. All laterals will be
classified as producer wells.
2. Location Summary
(Requirements of 20 AAC 25.005(c)(2))
These laterals will target the A sand package in the Kuparuk reservoir. See attached 10-401 form for surface
and subsurface coordinates of the 1 L-151-1, 1 L-151-1-01 & 1 L-15L1-02.
3. Blowout Prevention Equipment Information
(Requirements of 20 AAC 25.005 (c)(3))
Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC.
BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations.
— Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3�00 psi. Using the
maximum formation pressure in the area of 3702 psi in 1 L-16 (i.e. 12.1 ppg EMW), the maximum
potential surface pressure in 1 L-15, assuming a gas gradient of 0.1 psi/ft, would be 3102 psi. See the
"Drilling Hazards Information and Reservoir Pressure" section for more details.
— The annular preventer will be tested to 250 psi and 2,500 psi.
4. Drilling Hazards Information and Reservoir Pressure
(Requirements of 20 AAC 25.005 (c)(4))
Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a))
The formation pressure in KRU 1 L-15 was measured to be 2962 psi (9.5 ppg EMW) on 4/24/2015. The
maximum downhole pressure in the 1 L-15 vicinity is to the south in the 1 L-16 injector at 3702 psi (12.1 ppg
EMW) from May of 2014. The 1 L-151-1-01 sidetrack will be drilled south and could encounter formation
pressure from 1 L-16.
Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b))
Wells on 1 L pad have injected gas, so there is a chance of encountering free gas while drilling the 1 L-15
laterals. If significant gas is detected in the returns the contaminated mud can be diverted to a storage tank
away from the rig.
Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c))
The major expected risk of hole problems in the 1 L-15 laterals will be shale instability across faults. Managed
pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings.
5. Procedure for Conducting Formation Integrity tests
(Requirements of 20 AAC 25.005(c)(5))
The 1 L-15 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity
test is not required.
Page 2 of 6 October 26, 2016
PTD Application: 1 L-151-1, 1 L-151-1-01 & 1 L-151-1-02
6. Casing and Cementing Program
(Requirements of 20 AAC 25.005(c)(6))
New Completion Details
Lateral Name
Liner Top
Liner Btm
Liner Top
Liner Btm
Liner Details
MD
MD
TVDSS
TVDSS
1L-15L1
6540'
10200'
5940'
5995`
2-3/8", 4.7#, L-80, ST-L slotted liner;
aluminum billet on top
1L-15L1-01
6380'
9300'
5912'
6001`
2-3/8", 4.7#, L-80, ST-L slotted liner;
aluminum billet on to
1L-15L1-02
6325'
10200'
5879'
5933'
2-3/8", 4.7#, L-80, ST-L slotted liner;
de to ment sleeve on to
Existing Casing/Liner Information
Category
OD
Weight
(ppf)
Grade
Connection
Top MD
Btm MD
Top
TVD
Btm
TVD
Burst
psi
Collapse
psi
Conductor
16"
62.5
H-40
Welded
0'
102'
0'
102'
1640
670
Surface
9-5/8"
36.0
J-55
BTC
0'
3475'
0'
3475'
3520
2220
Production
7"
26.0
J-55
BTC
0'
6704'
0'
6265'
4980
4320
Tubing
3-1/2"
9.3
L-80
EUE-8RD
0
6345'
0
6008'
10160
10530
7. Diverter System Information
(Requirements of 20 AAC 25.005(c)(7))
Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a
diverter system is not required.
8. Drilling Fluids Program
(Requirements of 20 AAC 25.005(c)(8))
Diagram of Drilling System
A diagram of the Nabors CDR3-AC mud system is on file with the Commission.
Description of Drilling Fluid System
— Window milling operations: Water -based Power-vis milling fluid (8.6 ppg)
— Drilling operations: Water -based Flo -Pro drilling mud (8.6 ppg). This mud weight will not
hydrostatically overbalance the reservoir pressure, overbalanced conditions will be maintained using
MPD practices described below.
— Completion operations: The well will be loaded with 11.8 ppg potassium formate completion fluid in
order to provide formation over -balance and well bore stability while running completions. If higher
pressure is encountered, potassium formate will be used to provide over -balance.
Managed Pressure Drilling Practice
Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on
the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud
weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled
tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3
"Blowout Prevention Equipment Information".
In the 1 L-15 laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target will
be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if
increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be
employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates
or change in depth of circulation will be offset with back pressure adjustments.
Page 3 of 6 October 26, 2016
PTD Application: 1 L-15L1, 1 L-151_1-01 & 1 L-151-1-02
Pressure at the 1L-15 Window 6330' MD, 6001' TVD) Using MPD
Pumps On 1.5 b m
Pumps Off
A -sand Formation Pressure 9.5
2965 psi
2965 psi
Mud Hydrostatic 8.6
2684 psi
2684 psi
Annular friction i.e. ECD, 0.090 si/ft
570 psi
0 psi
Mud + ECD Combined
no choke pressure)
3254 psi
2684 psi
underbalanced —281psi)
Target BHP at Window (11.8 pp)
3683 psi
3683 psi
Choke Pressure Required to Maintain
Target BHP
429 psi
999 psi
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
Background
KRU well 1L-15 is a Kuparuk A Sand producer equipped with 3-1/2" tubing and 7" production casing. The
CTD sidetrack will utilize three laterals to target the A4/A5 Sands to north and A5 Sand to the south of 1L-
15.
A rig workover was performed to install a new upper completion with a tandem wedge assembly. Prior to
CTD operation, an inner wedge will be set at 6330' MD.
Nabors CDR3-AC will kick-off at 6330' MD. All three laterals will be completed with 2-3/8" slotted liner
from TD with the last lateral liner top located inside the tubing tail.
The IL-15L1 northern lateral will exit the big tail pipe at 6330' MD and TD at 10200' MD, targeting the
A4 and A5 sands. It will be completed with 2-3/8" slotted liner from TD up to 6540'MD with an aluminum
billet for kicking off the 1L-15L1-01.
The 1L-15L1-01 lateral will drill to the south to a TD of 9300' MD targeting the A5 sand. It will be
completed with 2-3/8" slotted liner from TD up to 6380' MD with an aluminum billet for kicking off the
1L-15L1-02.
Page 4 of 6 October 26, 2016
PTD Application: 1 L-15L1, 1 L-151_1-01 & 1 L-151_1-02
The 1L-15L1-02 lateral will drill to the north to a TD of 10,200' MD targeting the A4 and A5 sands. It will
be completed with slotted liner from TD to 6325' MD in the tubing tail with a deployment sleeve.
Pre-CTD Work
1. RU Slickline: Obtain SBHP
2. RU E-line: Set inner wedge at 6330' MD.
3. Prep site for Nabors CDR3-AC and set BPV.
Rib Work
1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test.
2. 1L-15L1 Sidetrack (A4/A5 sand - North)
i. Mill 2.80" window at 6330' MD.
ii. Drill 3" bi-center lateral to TD of 10200' MD.
iii. Run 2%" slotted liner with an aluminum billet from TD up to 6540' MD.
3. 1L-15L1-01 Lateral (A5 sand - South)
i. Kick off of the aluminum billet at 6540' MD.
ii. Drill 3" bi-center lateral to TD of 9300' MD.
iii. Run 2%" slotted liner with aluminum billet from TD up to 6380' MD.
4. 1L-15L1-02 Lateral (A4/A5 sand - North)
i. Kickoff of the aluminum billet at 63 80' MD.
ii. Drill 3" bi-center lateral to TD of 10200' MD.
iii. Run 2%" slotted liner with deployment sleeve from TD up to 6325' MD.
5. Freeze protect, set BPV, ND BOPE, and RDMO Nabors CRD3-AC.
Post -Rig Work
1. Pull BPV
2. Obtain SBHP
3. Install gas lift design
4. Put on production
Pressure Deployment of BHA
The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on
the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double
swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the
BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two
barriers to reservoir pressure, both internal and external to the BHA, during the deployment process.
During BHA deployment, the following steps are observed.
— Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is
installed on the BOP riser with the BHA inside the lubricator.
— Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and
the BHA is lowered in place via slick -line.
— When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate
reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate
Page 5 of 6 October 26, 2016
PTD Application: 1 L-15L1, 1 L-151-1-01 & 1 L-151-1-02
reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from
moving when differential pressure is applied. The lubricator is removed once pressure is bled off above
the deployment rams.
— The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the
closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the
double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized,
and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole.
During BHA undeployment, the steps listed above are observed, only in reverse.
Liner Running
— The 1 L-15 laterals will be displaced to an overbalanced fluid (11.8 ppg potassium formate) prior to
running liner. See "Drilling Fluids" section for more details.
— While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for
emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew
conducts a deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will
provide secondary well control while running 2-3/8" liner.
14. Disposal of Drilling Mud and Cuttings
(Requirements of 20 AA 25.005(c)(14))
• No annular injection on this well. /
• All solid waste will be transported to the grind and inject facility at DS-4 Prudhoe Bay for disposal.
• Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18
or 1 B disposal facilities) or Prudhoe DS-4 if a Kuparuk facility is unavailable.
• All wastes and waste fluids hauled from the pad must be properly documented and manifested.
• Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200).
15. Directional Plans for Intentionally Deviated Wells
(Requirements of 20 AAC 25.050(b))
— The Applicant is the only affected owner.
— Please see Attachment 1: Directional Plans
— Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. f
— MWD directional, resistivity, and gamma ray will be run over the entire open hole section. ]
— Distance to Nearest Property Line (measured to KPA boundary at closest point)
Lateral Name
Distance
1 L-15L1
16000'
1 L-15L1-01
14350'
1 L-151_1-02
16000'
— Distance to Nearest Well within Pool
Lateral Name
Distance
Well
1 L-1511_1
167'
1 L-02
1 L-15L1-01
124'
1 L-13
1 L-15L1-02
136'
1 L-02
16.Attachments
Attachment 1: Directional Plans for IL- 15L1, IL- 15L1-01 & IL- 15L1-02laterals
Attachment 2: Current Well Schematic for 1L-15
Attachment 3: Proposed Well Schematic for IL-15L1, 1L-15L1-01 & 1L-15L1-02 laterals
Page 6 of 6 October 26, 2016
ConocoPhillips
ConocoPhillips (Alaska) Inc. -Kup2
Kuparuk River Unit
Kuparuk 1 L Pad
1 L-15
1 L-15L1
Plan: 1 L-15L1 wp02
Standard Planning Report
25 October, 2016
FfAA P ap 2
BAKER
HUGHES
ConocoPhillips
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-15L1
Design:
1 L-15L1_wp02
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
Well 1 L-15
TVD Reference:
Mean Sea Level
MD Reference:
1 L-15 @ 118.00usft (Parker 141)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Project Kuparuk River Unit, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
rrFAI
BAKER
HUGHES
Site Kuparuk 1 L Pad
Site Position: Northing: 5,949,190.90usft Latitude: 70' 16' 19.650 N
From: Map Easting: 539,916.78 usft Longitude: 149' 40' 37.763 W
Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 0.30 °
Well 1 L-15
Well Position +N/-S 0.00 usft Northing: 5,948,581.09 usft Latitude: 70' 16' 13.652 N
+E/-W 0.00 usft Easting: 539,922+94 usft Longitude: 149° 40' 37.678 W
Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 83.20 usft
Wellbore 1 L-151-1
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
(I C) (nT)
BG G M 2016 12/1 /2016 17.86 80.91 57,543
Design 1L-15L1_wp02
Audit Notes:
Version: Phase: PLAN Tie On Depth: 6,300.00
Vertical Section: Depth From (IVD) +N/-S +E/-W Direction
(usft) (usft) (usft) (I
-83.20 0.00 0.00 0.00
1012512016 12:12:56PM Page 2 COMPASS 5000.1 Build 74
ConocoPhillips Fel..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1 L-15
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
1 L-15 @ 118.00usft (Parker 141)
Site:
Kuparuk 1 L Pad
North Reference:
True
Well:
1L-15
Survey Calculation Method:
Minimum Curvature
Wellbore:
1 L-15L1
Design:
1L-151-1 wp02
Plan Sections
Measured
TVD Below
Dogleg
Build
Turn
Depth
Inclination
Azimuth
System
+N/-S
+E/-W
Rate
Rate
Rate
TFO
(usft)
V)
(I
(usft)
(usft)
(usft)
(°/100ft)
(°/100ft)
(°110oft)
(^) Target
6,300.00
39.67
232.80
5,855.75
-792.86
-922.58
0.00
0.00
0.00
0.00
6,330.00
40.41
232.71
5,878.72
-804.54
-937.94
2.47
2.47
-0.30
-4.51
6,351.00
44.61
232.71
5,894.20
-813.13
-949.23
20.00
20.00
0.00
0.00
6,464.48
90.00
232.71
5,936.84
-874.91
-1,030.35
40.00
40.00
0.00
0.00
6,634.48
91.85
300.70
5,933.71
-884.15
-1,190.25
40.00
1.09
39.99
88.00
6,710.00
92.31
305.97
5,930.97
-842.69
-1,253.29
7.00
0.60
6.98
85.00
6,785.00
92.30
311.22
5,927.96
-795.96
-1,311.84
7.00
-0.01
7.01
90.00
6,860.00
89.67
315.77
5,926.67
-744.36
-1,366.22
7.00
-3.51
6.06
120.00
6,985.00
85.31
323.36
5,932.16
-649.41
-1,447.14
7.00
-3.49
6.08
120.00
7,110.00
89.71
330.93
5,937.59
-544.60
-1,514.81
7.00
3.52
6.06
60.00
7,210.00
95.44
334.96
5,933.10
-455.69
-1,560.22
7.00
5.73
4.03
35.00
7,310.00
93.02
341.55
5,925.72
-363.11
-1,597.14
7.00
-2.42
6.59
110.00
7,410.00
92.02
348.48
5,921.32
-266.67
-1,622.96
7.00
-0.99
6.94
98.00
7,570.00
91.98
359.69
5,915.70
-107.87
-1,639.41
7.00
-0.02
7.00
90.00
7,900.00
89.87
22.70
5,910.30
213.62
-1,575.78
7.00
-0.64
6.97
95.00
8,160.00
88.31
40.83
5,914.47
433.73
-1,439.51
7.00
-0.60
6.98
95.00
8,260.00
88.33
33.83
5,917.40
513.16
-1,378.93
7.00
0.01
-7.00
-90.00
8,560.00
88.44
12.82
5,925.97
786.99
-1,260.86
7.00
0.04
-7.00
-90.00
8,635.00
83.51
11.02
5,931.24
860.16
-1,245.41
7.00
-6.58
-2.41
-160.00
8,710.00
88.06
8.39
5,936.75
933.87
-1,232.82
7.00
6.07
-3.50
-30.00
8,825.00
90.15
0.62
5,938.55
1,048.40
-1,223.79
7.00
1.82
-6.76
-75.00
8,975.00
89.24
11.08
5,939.35
1,197.41
-1,208.53
7.00
-0.61
6.97
95.00
9,100.00
86.27
2.84
5,944.26
1,321.27
-1,193.40
7.00
-2.38
-6.59
-110.00
9,225.00
86.31
11.61
5,952.37
1,444.90
-1.177.73
7.00
0.03
7.01
90.00
9,375.00
77.74
5.47
5,973.18
1,591.58
-1,155.61
7.00
-5.71
-4.09
-145.00
9,525.00
88.24
5.47
5,991.45
1.739.57
-1,141.44
7.00
7.00
0.00
0.00
9,705.00
95.46
15.81
5,985.62
1,916.03
-1,108.32
7.00
4.01
5.75
55.00
9,855.00
90.16
6.73
5,978.24
2,062.76
-1,079.11
7.00
-3.53
-6.05
-120.00
9,955.00
86.67
12.80
5,981.01
2,161.22
-1,062.17
7.00
-3.49
6.07
120.00
10,200.00
86.82
355.62
5,995.03
2,404.24
-1,044.28
7.00
0.06
-7.01
-90.00
1012512016 12:12:56PM Page 3 COMPASS 5000.1 Build 74
f
ConocoPhillips ME il.
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1 L-15
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
1 L-15 @ 118.00usft (Parker 141)
Site:
Kupatuk 1L Pad
North Reference:
True
Well:
1L-15
Survey Calculation Method:
Minimum Curvature
Wellbore:
1 L-15L1
Design:
1 L-15L1_wp02
Planned Survey
Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth
Inclination
Azimuth
System
+N/-S
+E/-W
Section
Rate
Azimuth
Northing
Easting
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(°/100ft)
(°}
(usft)
(usft)
6,300.00
39.67
232.80
5,855.75
-792.86
-922.58
-792.86
0.00
0.00
5,947,783.43
539,004.67
TIP
6,330.00
40.41
232.71
5,878.72
-804.54
-937.94
-804.54
2.47
-4.51
5,947,771.67
538,989.37
KOP
6,351.00
44.61
232.71
5,894.20
-813.13
-949.23
-813.13
20.00
0.00
5,947,763.02
538,978.13
End 20
dis, Start 40 dls
6,464.48
90.00
232.71
5,936.84
-874.91
-1,030.35
-874.91
40.00
0.00
5,947,700.81
538,897.34
4
6,634.48
91.85
300.70
5,933.71
-884.15
-1,190.25
-884.15
40.00
88.00
5,947.690.73
538,737.51
End 40
dls, Start 7 dis
6,710.00
92.31
305.97
5,930.97
-842.69
-1,253.29
-842.69
7.00
85.00
5,947,731.84
538,674.26
6
6,785.00
92.30
311.22
5,927.96
-795.96
-1,311.84
-795.96
7.00
90.00
5,947,778.26
538,615.47
7
6,860.00
89.67
315.77
5,926.67
-744.36
-1,366.22
-744.36
7.00
120.00
5,947,829,56
538,560.83
8
6,985.00
85.31
323.36
5.932.16
-649.41
-1,447.14
-649.41
7.00
120.00
5,947,924.07
538,479.41
9
7,110.00
89.71
330.93
5,937.59
-544.60
-1,514.81
-544.60
7.00
60.00
5,948,028.52
538,411.19
10
7,210.00
95.44
334.96
5,933.10
-455.69
-1,560.22
-455.69
7.00
35.00
5,948,117.18
538,365.31
11
7,310.00
93.02
341.55
5,925.72
-363.11
-1,597.14
-363.11
7.00
110.00
5,948,209.55
538,327.91
12
7,410.00
92.02
348.48
5,921.32
-266.67
-1,622.96
-266.67
7.00
98.00
5,948,305.85
538,301.58
13
7,570.00
91.98
359.69
5,915.70
-107.87
-1,639.41
-107.87
7.00
90.00
5,948,464.54
538,284.29
14
7,900.00
89.87
22.70
5,910.30
213.62
-1,575.78
213.62
7.00
95.00
5,948,786,33
538,346.21
15
8,160.00
88.31
40.83
5,914.47
433.73
-1,439.51
433.73
7.00
95.00
5,949,007.13
538,481.29
16
8,260.00
88.33
33.83
5,917.40
513.16
-1,378.93
513.16
7.00
-90.00
5,949,086.88
538,541.44
17
8,560.00
88.44
12.82
5,925.97
786.99
-1,260.86
786.99
7.00
-90.00
5,949,361.30
538,658.04
18
8,635.00
83.51
11.02
5,931.24
860.16
-1,245.41
860.16
7.00
-160.00
5,949,434.55
538,673.10
19
8,710,00
88.06
8.39
5,936.75
933.87
-1,232.82
933.87
7.00
-30.00
5,949,508.31
538,685.31
20
8,825.00
90.15
0.62
5,938.55
1,048.40
-1,223.79
1,048.40
7.00
-75.00
5,949,622.88
538,693.72
21
8,975.00
89.24
11.08
5,939.35
1,197.41
-1,208.53
1,197.41
7.00
95.00
5,949,771.96
538,708.19
22
9,100.00
86.27
2.84
5,944.26
1,321.27
-1,193.40
1,321.27
7.00
-110.00
5,949,895.88
538,722.66
23
9.225.00
86.31
11.61
5,952.37
1,444.90
-1,177.73
1,444.90
7.00
90.00
5,950,019.58
538,737.68
24
9,375.00
77.74
5.47
5,973.18
1,591.58
-1,155.61
1,591.58
7.00
-145.00
5,950,166.36
538,759.01
25
9,525.00
88.24
5.47
5,991.45
1,739.57
-1.141.44
1,739.57
7.00
0.00
5,950,314.41
538,772.40
1012512016 12:12:56PM Page 4 COMPASS 5000.1 Build 74
ConocoPhillips FEW
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-151-1
Design:
1 L-1511_wp02
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1 L-15
Mean Sea Level
1L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Planned Survey
Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth
Inclination
Azimuth
System
+Nl-S
+E/-W
Section
Rate
Azimuth
Northing
Easting
(usft)
(1)
(1)
(usft)
(usft)
(usft)
(usft)
(°/10oft)
(1)
(usft)
(usft)
26
9,705.00
95.46
15.81
5,985.62
1,916.03
-1,108.32
1,916.03
7.00
55.00
5,950,491,03
538,804.58
27
9,855.00
90.16
6.73
5,978.24
2,062.76
-1,079.11
2,062.76
7.00
-120.00
5,950,637.90
538,833.01
28
9,955.00
86.67
12.80
5,981.01
2,161.22
-1,062.17
2,161.22
7.00
120.00
5,950,736.43
538,849.43
29
10,200.00
86.82
355.62
5,995.03
2,404.24
-1,044.28
2,404.24
7.00
-90.00
5,950,979.52
538,866.03
Planned TD at 10200.00
1012512016 12:12:56PM Page 5 COMPASS 5000.1 Build 74
ConocoPhillips welal
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk I Pad
Well:
1L-15
Wellbore:
1 L-15L1
Design:
1 L-15L1_wp02
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Targets
Target Name
hit/miss target Dip Angle Dip Dir. TVD +NI-S +E/-W Northing
Shape (°) (°) (usft) (usft) (usft) (usft)
11--151-1_T04 0.00 0.00 5,942.00-6,900.471.138,532.27 5,947,720.00
plan misses target center by 1139471.22usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1L-1511_T09 0.00 0.00 5,930.00-5,498.981,138,845.74 5,949,123.00
- plan misses target center by 1139778.03usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
- Point
1L-151-1_Fault3 0.00 0.00 5,941.00-5,360.221,138,894.48 5,949,262.00
plan misses target center by 1139826.21 usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Polygon
Point 1 5,941.00 0.00 0.00 5,949,262.00
Point 2 5,941.00 1.00 1.00 5,949,263.01
1L-151-1_T08 0.00 0.00 5,923.00-5,769.521,138,753.29 5,948,852.00
- plan misses target center by 1139686.74usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
- Point
1L-15L1_Fault1_M 0.00 0.00 0.00-6,611.351,138,514.80 5,948,009.00
plan misses target center by 1139467.28usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Rectangle (sides W1,000.00 H1.00 D0.00)
11--151-1_T02 0.00 0.00 5,936.00-7,200.341,138,877.72 5,947,422.00
plan misses target center by 1139818.31 usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1L-151-1_T05 0.00 0.00 5,929.00-6,677.201,138,485.45 5,947,943.00
plan misses target center by 1139423.22usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1L-15L1_T12 0.00 0.00
5,996.00
-4,520.741,139,009.94
5,950,102.00
plan misses target center by 1139938.62usft
at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1L-151-1-01_Fault1_M 0.00 0.00
0.00
-8,085.131,138,253.95
5,946,534.00
plan misses target center by 1139214.92usft at 6300,00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Rectangle (sides W1,000.00 1-11.00 D0.00)
1L-151-1_T14 0.00 0.00
6,001.00
-3,903.131,139,097.23
5,950,720.00
plan misses target center by 1140024.06usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1L-15L1_Faultl 0.00 0.00
5,928.00
-6,611.351,138.514.80
5,948,009.00
plan misses target center by 1139452.23usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Polygon
Point 1
5,928.00
0.00 0.00
5,948,009.00
Point 2
5,928.00
1.00 1.00
5,948,010.01
1L-15 CTD Polygon Sou 0.00 0.00
0.00
-7,318.271,139,240.13
5,947,306.00
- plan misses target center by 1140196.42usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
- Polygon
Point 1
0.00
0.00 0.00
5,947,306.00
Point 2
0.00
-130.08-368.72
5.947,173.98
Point
0.00
-192.21-536.07
5,947,110.97
Point
0.00
-378.39-696.07
5,946,923.96
Point 5
0.00
-580.00-774.13
5,946,721.96
Point 6
0.00
-898.95-789.81
5,946,402.96
Point
0.00
-1,245.77-832.64
5,946,055.95
Point
0.00
-1,641.47-897.72
5,945,659.95
Point 9
0.00
-2,231.27-948.83
5.945,069.95
Point 10
0.00
-2,488.29-950.18
5.944,812.95
Point 11
0.00
-2,403.13-1,359.78
5,944,895.93
Point12
0.00
-1,903.52-1,274.14
5,945,395.94
Well 1 L-15
Mean Sea Level
1L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Easting
(usft) Latitude Longitude
1,678,364.00 70° V 5.681 N 140° 33' 10.121 W
1,678,670.00 70° 1' 18.829 N 140° 32' 55.212 W
1,678,718.00 70° 1' 20.105 N 140° 32' 53.233 W
1, 678, 718.00
1, 678, 718.99
1,678,579.00 70° 1' 16.338 N 140° 32' 58.998 W
1,678,345.00 70° 1' 8.514 N 140° 33' 9.378 W
1,678,711.00 70' 1' 2.263 N 140° 33' 1.599 W
1,678,316.00 70° 1' 7.917 N 140° 33' 10.494 W
1,678,829.00 70' 1' 28.087 N 140° 32' 46.353 W
1,678,092.00 70' 0' S4.586 N 140° 33' 23.098 W
1,678,913.00 70° 1' 33.956 N 140° 32' 41.224 W
1, 678, 345.00
1,678,345.00
1,678,345.99
1, 679, 074.00
1, 679, 074.00
1,678,706.01
1, 678, 539.01
1, 678, 380.02
1, 678, 303.03
1,678,289.05
1,678,248.06
1,678.185.09
1,678,137.11
1,678,137.12
1, 677, 727.12
1, 677, 810.10
700 V 8.514 N 1400 33' 9.378 W I
70° V 0.586 N 140° 32' 51.816 W I
1012512016 12:12:56PM Page 6 COMPASS 5000.1 Build 74
ConocoPhillips Has
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk I Pad
Well:
1L-15
Wellbore:
IL-15L1
Design:
1 L-15L1_wp02
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1L-15
Mean Sea Level
i L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Point 13
0.00
-1,438.66
-1,236.70
5,945,860.94
1,677,845.07
Point 14
0.00
-827.83
-1,191.48
5,946,471.94
1,677,887.04
Point 15
0.00
-418.01
-1,148.32
5,946,881.95
1,677,928.03
Point 16
0.00
-112.79
-993.70
5,947,187.95
1,678,081.01
Point 17
0.00
135.99
-756.37
5,947,437.96
1,678,316.99
Point 18
0.00
266.58
-484.65
5,947,569.98
1,678,587.99
Point 19
0.00
368.47
-81.07
5,947,674.00
1,678,990.98
Point20
0.00
0.00
0.00
5,947,306.00
1,679,074.00
1 L-151-1_Fault3_M 0.00 0.00
0.00
-5,360.221,138,894.48
5,949,262.00
1,678,718.00
70° V 20.105 N 140° 32' 53.233 W
- plan misses target center by 1139841.25usft
at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
- Rectangle (sides W1,000.00 H1.00 D0.00)
1 L-15 CTD Polygon Nort 0.00 0.00
0.00
-7,311.271,139,240.17
5,947,313.00
1,679,074.00
70' V 0.654 N 140' 32' 51.785 W
- plan misses target center by 1140196.42usft
at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Polygon
Point 1
0.00
0.00 0.00
5,947,313.00
1,679,074.00
Point 2
0.00
-75.99 -194A2
5,947,235.99
1,678,880.00
Point
0.00
9.52-479.00
5,947,319.98
1,678,595.00
Point
0.00
246.78-713.78
5,947,555.97
1,678,358.99
Point
0.00
622.80-899.83
5,947,930.96
1,678,170.97
Point
0.00
977.12-952.97
5,948,284.96
1.678.115.95
Point
0.00
1,261.70-868.47
5,948,569.95
1,678,198.94
Point 8
0.00
1,648.28-588.41
5,948,957.97
1,678,476.91
Point
0.00
2,418.87-494.35
5,949,728.98
1,678,566.88
Point 10
0.00
2,759.46-409.55
5,950,069.98
1,678,649.86
Point11
0.00
3,417.93-294.08
5,950,728.99
1,678,761.82
Point 12
0.00
3,660.55-216.80
5,950,971.99
1,678,837.81
Point 13
0.00
3,645.42 -1.85
5,950,958.00
1,679,052.82
Point 14
0.00
3,423.14 45.99
5,950,736.00
1,679,101.83
Point 15
0.00
3,069.33 2.12
5,950,382,00
1,679,059.84
Point 16
0.00
2,715.70 -75.74
5,950,027.99
1,678,983.86
Point 17
0.00
2,403.12-161.39
5,949,714.99
1,678,899.88
Point 18
0.00
2,077.02-149.11
5,949,389.00
1,678,913.89
Point 19
0.00
1,765.13-177.75
5,949,076.99
1,678,886.91
Point20
0.00
1,459.80-311.37
5,948,770,98
1,678,754.92
Point21
0.00
1,127.83-515.13
5,948,437.97
1,678,552.95
Point22
0.00
925.99-550.20
5,948,235.97
1,678,518.95
Point23
0.00
592.57-475.94
5,947,902.98
1,678,594.97
Point24
0.00
390.71-316.98
5,947,701.98
1,678,754.98
Point25
0.00
354.47 -81.15
5,947,667.00
1,678,990.98
Point 26
0.00
0.00 0.00
5,947,313.00
1,679,074.00
1 L-151-1_T10 0.00 0.00
5,944.00
-5,374.081,138,867.40
5,949,248.00
1,678,691.00
70' 1' 20.010 N 140' 32' 54.062 W
plan misses target center by 1139799.19usft at 6300.00usft MD (5855.75 TVD,-792.86
N,-922.58 E)
Point
1L-151-1_T03 0.00 0.00
5,932.00
-7,158.421,138,704.92
5,947,463.00
1,678,538.00
70' 1' 2.923 N 140° 33' 6.325 W
plan misses target center by 1139645.28usft at 6300.00usft
MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1L-151-1_T07 0.00 0.00
5,915.00
-6,066.81 1,138,613.70
5,948,554.00
1,678,441.00
70' V 13.656 N 140' 33' 4.236 W
plan misses target center by 1139548.48usft at 6300.00usft MD (5855.75 TVD,-792.86
N,-922.58 E)
Point
1 L-151-1_T13 0.00 0.00
5,982.00
-4.228.971,139,060.50
5,950,394.00
1,678,878.00
70' 1' 30.846 N 140' 32' 43.666 W
plan misses target center by 1139988.26usft at 6300.00usft MD (5855.75 TVD,-792.86
N,-922.58 E)
Point
11--151-1_Fault2_M 0.00 0.00 0.00-5,758.571,138,763.35 5,948,863.00 1,678,589.00 70' 1' 16.430 N 140° 32' 58.665 W
plan misses target center by 1139711.79usft at 6300.O0usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Rectangle (sides W1,000.00 H1.00 D0.00)
1L-151-1 T01 0.00 0.00 5,943.00-7,187.261,139,051.81 5,947,436.00 1,678,885.00 70° V 2.135 N 140' 32' 56.601 W
plan misses target center by 1139992.32usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1L-151-1_T06 0.00 0.00 5,920.00-6,400.241,138,499.92 5,948,220.00 1,678,329.00 70' 1' 10.585 N 140° 33' 8.896 W
Ian misses target center by 1139436.29usft at 6300.O0usft MD 5855.75 TVD-792.86 N-922.58 E
1012512016 12:12:56PM Page 7 COMPASS 5000.1 Build 74
ConocoPhillips wed..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-15L1
Design:
1 L-15L1_Wp02
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1 L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
- Point
1 L-151-1_T11 0.00 0.00 5,954.00-4,839.51 1,138,960.25 5,949,783.00
1,678,781.00 70' 1' 25.065 N 140' 32' 49.132 W
plan misses target center by 1139890.01 usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1 L-15L1_Fault2 0.00 0.00 5,923.00-5,758.571,138,763.35 5,948,863.00
1,678,589.00 70' 1' 16.430 N 140' 32' 58.665 W
plan misses target center by 1139696.75usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Polygon
Point 1 5,923.00 0.00 0.00 5,948,863.00
1,678,589.00
Point 5,923.00 1.00 1.00 5,948,864.01
1,678,589.99
1L-1511-01_Faultl 0.00 0.00 5,992.00-8,085.131,138,253.95 5,946,534.00
1,678,092.00 70' 0' 54.586 N 140' 33' 23.098 W
plan misses target center by 1139199.88usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Polygon
Point 1 5,992.00 0.00 0.00 5,946,534.00
1,678,092.00
Point 5,992.00 1.00 1.00 5,946,535.01
1,678,092.99
Casing Points
Measured Vertical Casing Hole
Depth Depth Diameter Diameter
(usft) (usft) Name (in) (in)
10,200.00 5,995.03 2 3/8 2.375 3 000
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/-S
+E/-W
(usft)
(usft)
(usft)
(usft)
Comment
6,300.00
5,855.75
-792.86
-922.58
TIP
6,330.00
5,878.72
-804.54
-937.94
KOP
6,351.00
5,894.20
-813.13
-949.23
End 20 dls, Start 40 dls
6,464.48
5,936.84
-874.91
-1,030.35
4
6,634.48
5,933.71
-884.15
-1,190.25
End 40 dls, Start 7 dls
6,710.00
5,930.97
-842.69
-1,253.29
6
6,785.00
5,927.96
-795.96
-1,311.84
7
6,860.00
5,926.67
-744.36
-1,366.22
8
6,985.00
5,932.16
-649.41
-1,447.14
9
7,110.00
5,937.59
-544.60
-1,514.81
10
7,210.00
5,933.10
-455.69
-1,560.22
11
7,310.00
5,925.72
-363.11
-1,597.14
12
7,410.00
5,921.32
-266.67
-1,622.96
13
7.570.00
5,915.70
-107.87
-1,639.41
14
7,900.00
5,910.30
213.62
-1,575.78
15
8,160.00
5,914.47
433.73
-1,439.51
16
8,260.00
5,917.40
513.16
-1,378.93
17
8,560.00
5.925.97
786.99
-1,260.86
18
8,635.00
5,931.24
860.16
-1,245.41
19
8,710.00
5,936.75
933.87
-1,232.82
20
8,825.00
5,938.55
1,048.40
-1,223.79
21
8,975.00
5,939.35
1,197.41
-1,208.53
22
9,100.00
5,944.26
1,321.27
-1,193.40
23
9,225.00
5,952.37
1,444.90
-1,177.73
24
9,375.00
5,973.18
1,591.58
-1,155.61
25
9,525.00
5,991.45
1,739.57
-1,141.44
26
9,705.00
5,985.62
1,916.03
-1,108.32
27
9,855.00
5,978.24
2,062.76
-1,079.11
28
9,955.00
5,981.01
2,161.22
-1,062.17
29
10,200.00
5,995.03
2,404.24
-1,044.28
Planned TD at 10200.00
1012512016 12:12:56PM Page 8 COMPASS 5000.1 Build 74
ConocoPhillips
ConocoPhillips (Alaska) Inc. -Kup2
Kuparuk River Unit
Kuparuk 1 L Pad
1 L-15
1 L-15L1-01
Plan: 1 L-15L1-01_wpO
Standard Planning Report
25 October, 2016
WOM"i I
BAKER
HUGHES
ConocoPhillips
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1L Pad
Well:
1L-15
Wellbore:
1 L-15L1-01
Design:
1 L-151-1-01_wp03
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1 L-15
Mean Sea Level
1L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Project Kuparuk River Unit, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
ri.g
BAKER
HUGHES
Site Kuparuk 1 L Pad
Site Position: Northing: 5,949,190.90usft Latitude: 70' 16' 19.650 N
From: Map Easting: 539,916.78 usft Longitude: 149' 40' 37.763 W
Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 0.30 °
Well 1L-15
Well Position +N/-S
0.00 usft Northing:
5,948,581.09 usft
Latitude: 70' 16' 13,652 N
+E/-W
0.00 usft Easting:
539,922.94 usft
Longitude: 149° 40' 37.678 W
Position Uncertainty
0.00 usft Wellhead Elevation:
usft
Ground Level: 83.20 usft
Wellbore 1 L-151-1-01
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
(°) (°) (nT)
BG G M 2016 12/ 1 /2016 17.86 80.91 57,543
Design 1L-15L1-01 wp03
Audit Notes:
Version: Phase: PLAN Tie On Depth: 6,540.00
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
(usft) (usft) (usft) (°)
-83.20 0.00 0.00 200.00
Plan Sections
Measured
TVD Below
Dogleg
Build
Turn
Depth
Inclination
Azimuth
System
+N/-S
+E/-W
Rate
Rate
Rate
TFO
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(°/100ft)
(°/100ft)
(°/100ft)
(°) Target
6,540.00
91.01
262.90
5,936.16
-903.11
-1,099.47
0.00
0.00
0.00
0.00
6,610.00
95.25
260.45
5,932.34
-913.22
-1,168.61
7.00
6.06
-3.51
-30.00
6,760.00
90.00
251.34
5,925.48
-949.70
-1,313.73
7.00
-3.50
-6.06
-120.00
6,960.00
90.00
237.34
5,925.48
-1,036.07
-1,493.57
7.00
0.00
-7.00
-90.00
7,110.00
87.28
227.20
5,929.04
-1,127.70
-1,612.01
7.00
-1.81
-6.77
-105.00
7,310.00
87.28
213.18
5,938.52
-1,279.93
-1,740.61
7.00
0.00
-7.01
-90.00
7,610.00
85.82
192.20
5,956.57
-1,554.65
-1,855.49
7.00
-0.49
-7.00
-94.00
7,850.00
89.31
175.75
5,966.77
-1,793.00
-1,872.01
7.00
1.46
-6.85
-78.00
8,050.00
89.31
189.75
5,969.17
-1,992.26
-1,881.56
7.00
0.00
7.00
90.00
8,150.00
89.31
182.75
5,970.37
-2,091.60
-1.892.44
7.00
0.00
-7.00
-90.00
8,275.00
87.05
191.20
5,974.34
-2,215.49
-1,907.59
7.00
-1.81
6.77
105.00
8,375.00
87.05
198.21
5,979.49
-2,312.03
-1,932.92
7.00
0.00
7.01
90.00
8,575.00
89.00
184.34
5,986.40
-2,507.56
-1,971.90
7.00
0.97
-6.93
-82.00
8,725.00
89.00
194.84
5,989.02
-2,655.24
-1,996.85
7.00
0.00
7.00
90.00
9,025.00
89.00
173.84
5,994.28
-2,952.66
-2,019.42
7.00
0.00
-7.00
-90.00
9,300.00
88.32
193.08
6,000.70
-3,225.79
-2,035.92
7.00
-0.24
7.00
92.00
1012512016 12:25.34PM Page 2 COMPASS 5000.1 Build 74
✓ ConocoPhillips FGrI
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1 L-15
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
1 L-15 @ 118-00usft (Parker 141)
Site:
Kuparuk 1 L Pad
North Reference:
True
Well:
1L-15
Survey Calculation Method:
Minimum Curvature
Wellbore:
1 L-15L1-01
Design:
1 L-15L1-01_wp03
Planned Survey
Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth Inclination
Azimuth
System
+N/-S
+E/-W
Section
Rate
Azimuth
Northing
Easting
(usft)
(I
(I
(usft)
(usft)
(usft)
(usft)
(°1100ft)
(°)
(usft)
(usft)
6,540.00
91.01
262.90
5,936.16
-903.11
-1,099.47
1,224.69
0.00
0.00
5,947,672.25
538,828.38
TIP/KOP
6,610.00
95.25
260.45
5,932.34
-913.22
-1,168.61
1,257.84
7.00
-29.95
5,947,661.77
538,759.30
Start 7 dls
6.760.00
90.00
251.34
5,925.48
-949.70
-1,313.73
1,341.75
7.00
-119.72
5,947,624.53
538,614.39
3
6,960.00
90.00
237.34
5,925.48
-1,036.07
-1,493.57
1,484.42
7.00
-90.00
5,947,537.21
538,435.04
4
7,110.00
87.28
227.20
5,929.04
-1,127.70
-1,612.01
1,611.03
7.00
-105.08
5,947,444.96
538,317.09
5
7,310.00
87.28
213.18
5,938.52
-1,279.93
-1,740.61
1,798.06
7.00
-90.33
5,947,292.07
538,189.32
6
7,610.00
85.82
192.20
5,956.57
-1,554.65
-1,855.49
2,095.51
7.00
-94.59
5,947,016.77
538,075.90
7
7,850.00
89.31
175.75
5,966.77
-1,793.00
-1,872.01
2,325.14
7.00
-78.43
5,946,778.36
538,060.65
8
8,050.00
89.31
189.75
5,969.17
-1,992.26
-1,881.56
2,515.65
7.00
90.08
5,946,579.07
538,052.15
9
8,150.00
89.31
182.75
5,970.37
-2,091.60
-1,892.44
2,612.71
7.00
-90.04
5,946,479.69
538,041.81
10
8,275.00
87.05
191.20
5,974.34
-2,215.49
-1,907.59
2,734.31
7.00
105.11
5,946,355.73
538,027.32
11
8.375.00
87.05
198.21
5,979.49
-2,312.03
-1,932.92
2,833.69
7.00
90.18
5,946,259.07
538,002.50
12
8,575.00
89.00
184.34
5,986.40
-2,507.56
-1,971.90
3,030.77
7.00
-82.28
5,946,063.35
537,964.56
13
8,725.00
89.00
194.84
5,989.02
-2,655.24
-1,996.85
3,178.07
7.00
90.09
5,945,915.56
537,940.40
14
9,025.00
89.00
173.84
5,994.28
-2,952.66
-2,019.42
3,465.27
7.00
-90.19
5,945,618.05
537,919,41
15
9,300.00
88.32
193.08
6,000.70
-3,225.79
-2,035.92
3,727.58
7.00
92.21
5,945,344.86
537,904.36
Planned TD at 9300.00
1012512016 12:25:34PM Page 3 COMPASS 5000.1 Build 74
i
ConocoPhillips rew..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1L-15
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
1 L-15 @ 118.00usft (Parker 141)
Site:
Kuparuk 1 L Pad
North Reference:
True
Well:
1 L-15
Survey Calculation Method:
Minimum Curvature
Wellbore:
1L-151-1-01
Design:
1L-15L1-01_wp03
Targets
Target Name
hit/miss target Dip Angle Dip Dir.
TVD
+N/-S +E/-W
Northing
Easting
Shape (1) (1)
(usft)
(usft) (usft)
(usft)
(usft)
Latitude Longitude
1L-15L1-01_T02 0.00 0.00
5,933.00
-7,235.331,138,876.53
5,947,387.00
1,678,710.00
700 1' 1.925 N 140° 33' 1.783 W
plan misses target center by 1139993.59usft
at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Point
1L-151-1_Fault3 0.00 0.00
5,941.00
-5,360.221,138,894.48
5,949,262.00
1,678,718.00
70' 1' 20.105 N 140' 32' 53.233 W
- plan misses target center by 1140002.67usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
- Polygon
Point 1
5,941.00
0.00 0.00
5,949,262.00
1,678,718.00
Point
5,941.00
1.00 1.00
5,949,263.01
1,678,718.99
11--151-1_Fault1_M 0.00 0.00
0.00
-6,611.351,138,514.80
5,948,009.00
1,678,345.00
70' V 8.514 N 140' 33' 9.378 W
plan misses target center by 1139644.03usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Rectangle (sides W1,000.00 1-11.00 D0.00)
1L-15L1-01_T03 0.00 0.00
5,930.00
-7,349.181,138,655.90
5,947,272.00
1,678,490.00
70' V 1.143 N 140° 33' 8.534 W
plan misses target center by 1139773.60usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Point
1L-151-1-01_T04 0.00 0.00
5,943.00
-7,589.181,138,463.61
5,947,031.00
1,678,299.00
70' 0' 59.094 N 140' 33' 15.022 W
plan misses target center by 1139582.70usft at 6540.00usft MD (5936.16 TVD,-903.11
N. -1099.47 E)
Point
1L-15L1-01_Faultl_M 0.00 0.00
0.00
-8,085.131,138.253.95
5,946,534.00
1,678,092.00
70' 0' S4.586 N 140° 33' 23.098 W
plan misses target center by 1139391.53usft at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
Rectangle (sides W1,000.00 1-11.00 D0.00)
1L-151-1_Faultl 0.00 0.00
5,928.00
-6,611.351,138,514.80
5,948,009.00
1,678,345.00
70° V 8.514 N 140' 33' 9.378 W
plan misses target center by 1139628.57usft at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
Polygon
Point 1
5,928.00
0.00 0.00
5,948,009.00
1,678,345.00
Point
5,928.00
1.00 1.00
5,948,010.01
1,678,345.99
1L-15 CTD Polygon Sou 0.00 0.00
0.00
-7,318.271,139,240.13
5,947,306.00
1,679,074.00
70' V 0.586 N 140' 32' 51.816 W
- plan misses target center by 1140373.10usft at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
Polygon
Point 1
0.00
0.00 0.00
5,947,306.00
1,679,074.00
Point
0.00
-130.08-368.72
5,947,173.98
1.678,706.01
Point
0.00
-192.21-536.07
5,947,110.97
1,678,539.01
Point
0.00
-378.39-696.07
5,946,923.96
1,678,380.02
Points
0.00
-580.00-774.13
5,946,721.96
1,678,303.03
Point
0.00
-898.95-789.81
5,946,402.96
1,678,289.05
Point
0.00
-1,245.77-832.64
5,946,055.95
1,678,248.06
Point
0.00
-1,641.47-897.72
5,945,659.95
1,678,185.09
Point
0.00
-2,231.27-948.83
5,945,069.95
1,678,137.11
Point 10
0.00
-2,488.29-950.18
5,944,812.95
1,678,137.12
Point 11
0.00
-2,403.13-1,359.78
5,944,895.93
1,677,727.12
Point12
0.00
-1,903.52-1,274.14
5,945,395.94
1,677,810.10
Point13
0.00
-1,438.66-1,236.70
5,945,860.94
1,677,845.07
Point14
0.00
-827.83-1.191.48
5,946,471.94
1,677,887.04
Point 15
0.00
-418.01-1,148.32
5,946,881.95
1,677,928.03
Point 16
0.00
-112.79-993.70
5,947,187.95
1,678,081.01
Point17
0.00
135.99-756.37
5,947,437.96
1,678,316.99
Point18
0.00
266.58-484.65
5,947,569.98
1,678,587.99
Point19
0.00
368.47 -81.07
5,947,674.00
1,678,990.98
Point20
0.00
0.00 0.00
5,947,306.00
1,679,074.00
1L-15L1_Fault3_M 0.00 0.00
0.00
-5,360.221,138,894.48
5,949,262.00
1,678,718.00
70' V 20.105 N 140° 32' S3.233 W
plan misses target center by 1140018.12usft at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
Rectangle (sides W1,000.00 1-11.00 D0.00)
1L-15 CTD Polygon Non 0.00 0.00
0.00
-7,311.271,139,240.17
5,947,313.00
1,679,074.00
70' V 0.654 N 140' 32' S1.785 W
- plan misses target center by 1140373.10usft at 6540.00usft MD (5936.16 TVD-903.11
N-1099.47 E)
1012512016 12:25:34PM Page 4 COMPASS 5000.1 Build 74
ConocoPhillips
reS..
ConocoPhillips
Planning Report
BAKER
HUGHES
Database: EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1L-15
Company: ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project: Kuparuk River Unit
MD Reference:
iL-15 @ 118.00usft (Parker 141)
Site: Kuparuk 1 L Pad
North Reference:
True
Well: 1L-15
Survey Calculation Method:
Minimum Curvature
Wellbore: 1 L-15L1-01
Design: 1L-15L1-01 wp03
Polygon
Point 1
0.00
0.00
0.00
5,947,313.00
1,679,074.00
Point
0.00
-75.99
-194.42
5,947,235.99
1,678,880.00
Point 3
0.00
9.52
-479.00
5,947,319.98
1,678,595.00
Point
0.00
246.78
-713.78
5,947,555.97
1,678,358.99
Points
0.00
622.80
-899.83
5,947,930.96
1,678,170.97
Point
0.00
977.12
-952.97
5,948,284.96
1,678,115.95
Point
0.00
1,261.70
-868.47
5,948,569.95
1,678,198.94
Point
0.00
1,648.28
-588.41
5,948,957.97
1,678,476.91
Point
0.00
2,418.87
-494.35
5,949,728.98
1,678,566.88
Point 10
0.00
2,759.46
-409.55
5,950,069.98
1,673,649.86
Point 11
0.00
3,417.93
-294.08
5,950.728.99
1,678,761.82
Point 12
0.00
3,660.55
-216.80
5,950,971.99
1,678,837.81
Point 13
0.00
3,645.42
-1.85
5,950,958.00
1,679,052.82
Point 14
0.00
3,423.14
45.99
5,950,736.00
1,679,101.83
Point 15
0.00
3,069.33
2.12
5,950,382.00
1,679,059.84
Point 16
0.00
2,715.70
-75.74
5,950.027.99
1,678,983.86
Point 17
0.00
2,403.12
-161.39
5,949,714.99
1,678,899.88
Point 18
0.00
2,077.02
-149.11
5,949,389.00
1,678,913.89
Point 19
0.00
1,765.13
-177.75
5,949,076.99
1,678,886.91
Point20
0.00
1,459.80
-311.37
5,948,770.98
1,678,754.92
Point21
0.00
1,127.83
-515.13
5,948,437.97
1,678,552.95
Point22
0.00
925.99
-550.20
5,948,235.97
1,678,518.95
Point23
0.00
592.57
-475.94
5,947,902.98
1,678,594.97
Point 24
0.00
390.71
-316.98
5,947,701.98
1,678,754.98
Point25
0.00
354.47
-81.15
5,947,667.00
1.678,990.98
Point26
0.00
0.00
0.00
5,947,313.00
1,679,074.00
1L-151-1-01_T01 0.00 0.00 5,938.00-7,167.421,139,081.91 5,947,456.00 1,678,915.00 70' V 2.283 N 140° 32' 55.661 W
- plan misses target center by 1140198.60usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
- Point
11--151-1-01_T05 0.00 0.00 5,969.00-8,065.351,138,297.06 5,946,554.00 1,678,135.00 70° 0' 54.715 N 140' 33' 21.790 W
plan misses target center by 1139419.05usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Point
1L-151-1_Fault2_M 0.00 0.00 0.00-5,758.571,138,763,35 5,948,863.00 1,678,589.00
plan misses target center by 1139888.62usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Rectangle (sides W1,000.00 1-11.00 D0.00)
1L-151-1-01_T07 0.00 0.00 5,979.00-8.598.881,138,196.22 5,946,020.00
plan misses target center by 1139321.69usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Point
1L-151-1-01 T08 0.00 0.00 5,986.00-8,946.671.138,149.37 5,945,672.00
plan misses target center by 1139277.24usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Point
1L-151-1-01_T06 0.00 0.00 5,971.00-8,320.101.138,243.71 5,946,299.00
plan misses target center by 1139367.32usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Point
1L-151-1_Fault2 0.00 0.00 5,923.00-5,758.571,138,763.35 5,948,863.00
plan misses target center by 1139873.17usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Polygon
Point 1 5,923.00 0.00 0.00 5,948,863.00
Point 5,923.00 1.00 1.00 5,948,864.01
1, 678, 037.00
1,677,992.00
1, 678, 083.00
70' 1' 16.430 N 140' 32' 58.665 W I
70° 0' 49.682 N 140' 33' 26.938 W
70' 0' 46.374 N 140° 33' 29.757 W I
70° 0' 52.319 N 140° 33' 24.396 W
1,678,589.00 70° 1' 16.430 N 140° 32' 58.665 W
1, 678, 589.00
1,678, 589.99
1 L-151-1-01_Faultl 0.00 0.00 5,992.00-8,085.131,138,253.95 5,946,534.00
1,678,092.00 70° 0' 54.586 N 140' 33' 23.098 W
plan misses target center by 1139376.07usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Polygon
Point 1 5,992.00 0.00 0.00 5,946,534.00
1,678,092.00
Point 5,992.00 1.00 1.00 5,946,535.01
1,678,092.99
1 L-151-1-01_T09 0.00 0.00 5,992.00-9,497.421,138,090.44 5,945,121.00
1.677,936.00 700 0' 41.112 N 1400 33' 33.787 W
- plan misses target center by 1139222.34usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
- Point
1012512016 12:25:34PM Page 5 COMPASS 5000.1 Build 74
ConocoPhillips
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-15L1-01
Design:
11--151-1-01_wp03
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1L-15
Mean Sea Level
1L-15 @ 118.00usft (Parker141)
True
Minimum Curvature
Casing Points
Measured Vertical Casing Hole
Depth Depth Diameter Diameter
(usft) (usft) Name (in) (in)
9,300.00 6,000.70 2 3/8" 2.375 3.000
ri.s
BAKER
HUGHES
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/-S
+E/-W
(usft)
(usft)
(usft)
(usft)
Comment
6,540.00
5,936.16
-903.11
-1,099.47
TIP/KOP
6,610.00
5,932.34
-913.22
-1,168.61
Start 7 dis
6,760.00
5,925.48
-949.70
-1,313.73
3
6,960.00
5,925.48
-1,036.07
-1,493.57
4
7,110.00
5,929.04
-1,127.70
-1,612.01
5
7,310.00
5,938.52
-1,279.93
-1,740.61
6
7,610.00
5,956.57
-1,554.65
-1,855.49
7
7,850.00
5,966.77
-1,793.00
-1,872.01
8
8,050.00
5,969.17
-1,992.26
-1,881.56
9
8,150.00
5,970.37
-2,091.60
-1,892.44
10
8,275.00
5,974.34
-2,215.49
-1,907.59
11
8,375.00
5,979.49
-2,312.03
-1,932.92
12
8,575.00
5,986.40
-2,507.56
-1,971.90
13
8,725.00
5,989.02
-2,655.24
-1,996.85
14
9,025.00
5,994.28
-2,952.66
-2,019A2
15
9,300.00
6,000.70
-3,225.79
-2,035.92
Planned TD at 9300.00
1012512016 12:25:34PM Page 6 COMPASS 5000.1 Build 74
W
Nwe
C
a
ID
00
�G
C
J M
O
O
N O
a O
o
m
U)
h O
o
O
� C
O � �
C d O
Q H Y C n W u 7 O N m.-.- N N N C V N N d
6)
U (D O M 1 O 1 V CO 1 O c D O (D (D O m O W (O C") d'
N (O� nCO OD MmOOD -(M (O I, CO V'OO V O n V e-
NZ
(nOOmC> � Dm.Zt(DOON't coC> V m(DM O V'
ONa CIJ
-6N
�N(O �O u7N0 r-C) m V V V �
OO OO OD T'��'T V (? m;: O ODmN N
U')
Lo
N O
N O O O O O O O O O O O O O O O O O O O O O O O O O O
J M
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
J
� 6 6 co 0 O 666 u' > o c O 6 Lo 6 6 6 u i 6 66 ((") 6 0 0 0 t 7 o
OD OD O Nm O D) O(? I�- m.-01 CNN Q)m
m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Cl 0 0 0 0 0 0 Cl 0 0 0 0
°o
T 0 0 0 0 0 0 0 0 0 0 0 0 0 C) 0 0 0 0 0 0 0 0 0 0 0 0
r
� r-- ti r- P- r-I--� n I�
)? aO COO u)O m D W u)m GOO I-N MOm NOD 10 1.0 �
O OD OD IOC! u� V O V V 00 V MNMO
.C*
LJ.I (p aO ON V'N CO M W OOp
mV
C O)
(D OO V m(D MOON GD ODm u7M�OI�GO�N�00 C',
+ mO N N M e f G O D M N N N
Ni
i i i i i
J
w0)
(n to O m c")� (D B O O CO O m Cl00 O M�
Q
O)
to F O O D (") m O N W" (M t o� O V; (D O V O 1�� �
�.
M
LO
Z (O U MC 6 I-- V m m dr CO m O (V -.a- r CO O V' ;z i!? m C v.
N(DON0000
W
} N M I�OO Lo m ICON I��m V''r (O
(O GOON
OO OD M m-t` Is m m.-Z2
0
�2 �2 N
J
J
W
ODOOM(D V'OD MO Cl) (")I.- NCl) NN
co (D E O M f) I� M O I l O u") C O u) V G O a,f� M M M�( D
m O
p N Cp t D (D V 7 cm•- V M 1 (() m m 00 O (O N 1 (O eM N c O N
_
��M" MN� m00000�`-M V MNNNM
U�
0 LL7
Zc c>
'N�� Oap 00 un N cO<0 mc) "')M�M� m(O";r V u);Z
O
Q n n(p V M V OO GD tO CO MM ([)m�01� V V' �"•Of-�(f)
u7
NN'-TO»_O OD N OD cc)(D m 0O(O M(O�N� LO(0 L6 nj O00
MMMM (MM
M MM 9 M M- LoN
N N M (")
mq4- 0 (O e, N V 7 a 0 .0 u) N N u 7 V
CNN�u7 LOO V (D NM V m0(D(O(D O u) cD M OD OOO
�O
c0 V m m m V 00 OI-I.- m m r.- W mm
O
u9OD mmmOO mm m mmOD GG OOOOmm � OO(M Omm Op'
W O
p o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
00MID M"LO 1)o0M
aD ") I� 1� GD V M O N m O u) M OD OD OO O
-cr 03 -T
M C'GD I�ID ODmO� N�OMmm O.0 .0 NR(O(O OON
m
DID (D (O (D (D c01� � � � OO OD OOD W oO OO OO m mmmmm0
�O
O
USN M�(O co I, OOmO�NM� u)O� OOmO'-NMmr u")(O
ZO
U) .-� r'�- -C4 CIJ"N
IJL- / .) " l In A, ���� ?4
(U!/ljsn 001) yldaa jeoijan anal,
IV-,*'
ConocoPh i I I i ps
ConocoPhillips (Alaska) Inc. -Kup2
Kuparuk River Unit
Kuparuk 1 L Pad
1 L-15
1 L-151-1-02
Plan: 1 L-15L1-02_wp00
Standard Planning Report
25 October, 2016
F ppl_-
BAKER
NUGHES
ConocoPhillips
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-15L1-02
Design:
1 L-15L1-02_wp00
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
Well 1 L-15
TVD Reference:
Mean Sea Level
MD Reference:
1L-15 @ 118.00usft (Parker141)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Project Kuparuk River Unit, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
rG.I
BAKER
HUGHES
Site Kuparuk 1 L Pad
Site Position: Northing: 5,949,190.90usft Latitude: 70' 16' 19.650 N
From: Map Easting: 539,916.78 usft Longitude: 149' 40' 37.763 W
Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 0.30 °
Well 1 L-15
Well Position +N/-S
0.00 usft Northing:
5,948,581.09 usft
Latitude: 70° 16' 13.652 N
+E/-W
0.00 usft Easting:
539,922.94 usft
Longitude: 149' 40' 37.678 W
Position Uncertainty
0.00 usft Wellhead Elevation:
usft
Ground Level: 83.20 usft
Wellbore 1L-1511-02
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
(°) (°) (nT)
BG G M 2016 12/1 /2016 17.86 80.91 57,543
Design 1 L-15L1-02_wp00
Audit Notes:
Version: Phase: PLAN Tie On Depth: 6,380.00
Vertical Section: Depth From (TVD) +N/S +E/-W Direction
(usft) (usft) (usft) (°)
-83.20 0.00 0.00 0.00
1012512016 12:27.12PM Page 2 COMPASS 5000,1 Build 74
I,,., ConocoPhillips rel..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1 L-15
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
1 L-15 @ 118.00usft (Parker 141)
Site:
Kuparuk I Pad
North Reference:
True
Well:
1 L-15
Survey Calculation Method:
Minimum Curvature
Wellbore:
1 L-15L1-02
Design:
1 L-15L1-02_wp00
Plan Sections
Measured
TVD Below
Dogleg
Build
Turn
Depth
Inclination
Azimuth
System
+N/-S
+E/-W
Rate
Rate
Rate
TFO
(usft)
V)
V)
(usft)
(usft)
(usft)
(°NOOft)
("/1o0ft)
(°/looft)
(1) Target
6,380.00
56.21
232.71
5,912.65
-826.65
-966.98
0.00
0.00
0.00
0.00
6,450.00
84.21
232.71
5,936.11
-866.16
-1,018.86
40.00
40.00
0.00
0.00
6,630.00
90.11
304.60
5,946.42
-869.79
-1,186.89
40.00
3.28
39.94
88.00
6,700.00
90.53
309.48
5,946.03
-827.63
-1,242.75
7.00
0.61
6.97
85.00
6,770.00
90.53
314.38
5,945.38
-780.87
-1,294.80
7.00
0.00
7.00
90.00
6,870.00
87.03
320.45
5,947.51
-707.30
-1,362.41
7.00
-3.50
6.07
120.00
6,995.00
91.42
328.02
5,949.19
-605.97
-1,435.38
7.00
3.51
6.06
60.00
7,095.00
97.15
332.06
5,941.72
-519.64
-1,485.16
7.00
5.73
4.04
35.00
7,195.00
94.71
338.66
5,931.38
-429.28
-1,526.58
7.00
-2.44
6.60
110.00
7,295.00
93.71
345.61
5,924.03
-334.41
-1,557.15
7.00
-1.01
6.95
98.00
7,455.00
93.63
356.83
5,913.76
-176.87
-1,581.49
7.00
-0.04
7.01
90.00
8,065.00
89.29
39.33
5,897.44
389.40
-1,396.36
7.00
-0.71
6.97
95.00
8.365.00
89.34
18.33
5,901.08
650.71
-1,252.49
7.00
0.02
-7.00
-90.00
8,440.00
84A0
16.53
5,905.17
722.14
-1,230.07
7.00
-6.58
-2.40
-160.00
8,515.00
88.96
13.91
5,909.51
794.36
-1,210.42
7.00
6.07
-3.50
-30.00
8,630.00
91.04
6.13
5,909.52
907.51
-1,190.43
7.00
1.81
-6.76
-75.00
8,700.00
90.61
11.01
5,908.51
976.70
-1,179.99
7.00
-0.61
6.97
95.00
8.825.00
87.62
2.79
5,910.43
1,100.66
-1,164.99
7.00
-2.39
-6.58
-110.00
8,950.00
87.65
11.55
5,915.60
1,224.46
-1,149A2
7.00
0.02
7.01
90.00
9,100.00
79.08
5.44
5,932.93
1,371.60
-1,127.38
7.00
-5.71
-4.07
-145.00
9,250.00
89.58
5A4
5,947.73
1,519.99
-1,113.26
7.00
7.00
0.00
0.00
9,430.00
97.65.
15.14
5,936.37
1,696.40
-1,081.31
7.00
4.48
5.39
50.00
9,580.00
92.32
6.05
5,923.32
1,843.08
-1,053.91
7.00
-3.55
-6.06
-120.00
9,680.00
88.82
12.11
5,922.33
1,941.76
-1,038.13
7.00
-3.51
6.06
120.00
9,880.00
88.85
358.11
5,926.42
2,140.43
-1,020.36
7.00
0.02
-7.00
-90.00
10,200.00
88.94
20.52
5,932.68
2,454.14
-968.91
7.00
0.03
7.00
90.00
1012512016 12:27.12PM Page 3 COMPASS 5000.1 Build 74
P
ConocoPhillips FZA..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1L-15
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
1 L-15 @ 118.00usft (Parker 141)
Site:
Kuparuk 1L Pad
North Reference:
True
Well:
1L-15
Survey Calculation Method:
Minimum Curvature
Wellbore:
11--151-1-02
Design:
1 L-15L1-02_wp00
Planned Survey
Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth
Inclination
Azimuth
System
+N/-S
+E/-W
Section
Rate
Azimuth
Northing
Easting
(usft)
V)
(1)
(usft)
(usft)
(usft)
(usft)
(°1100ft)
C)
(usft)
(usft)
6,380.00
56.21
232.71
5,912.65
-826.65
-966.98
-826.65
0.00
0.00
5,947,749.41
538,960.46
TIP
6,450.00
84.21
232.71
5,936.11
-866.16
-1,018.86
-866.16
40.00
0.00
5,947,709.63
538,908.79
KOP
6,630,00
90.11
304.60
5,946.42
-869.79
-1,186.89
-869.79
40.00
88.00
5,947,705.11
538,740.80
Start 40 dls
6,700.00
90.53
309.48
5,946.03
-827.63
-1,242.75
-827.63
7.00
85.00
5,947,746.96
538,684.72
End 40
dis, Start 7 dls
6,770.00
90.53
314.38
5,945.38
-780.87
-1,294.80
-780.87
7.00
90.00
5,947,793.44
538,632.43
5
6,870.00
87.03
320.45
5,947.51
-707.30
-1,362.41
-707.30
7.00
120.00
5,947,866.64
538,564.43
6
6.995.00
91.42
328.02
5,949A9
-605.97
-1,435.38
-605.97
7.00
60.00
5,947,967.57
538,490.93
7
7,095.00
97.15
332.06
5,941.72
-519.64
-1,485.16
-519.64
7.00
35.00
5,948,053.64
538,440.71
8
7,195.00
94.71
338.66
5,931.38
-429.28
-1,526.58
-429.28
7.00
110.00
5,948,143.76
538,398.81
9
7.295.00
93.71
345.61
5,924.03
-334.41
-1,557.15
-334.41
7.00
98.00
5,948,238.45
538,367.74
10
7,455.00
93.63
356.83
5,913.76
-176.87
-1,581.49
-176.87
7.00
90.00
5,948,395.85
538,342.57
11
8,065.00
89.29
39.33
5,897.44
389.40
-1,396 36
389.40
7.00
95.00
5,948,963.04
538,524.68
12
8,365.00
89.34
18.33
5,901.08
650.71
-1,252.49
650.71
7.00
-90.00
5,949,225.09
538,667.14
13
8,440.00
84.40
16.53
5,905.17
722.14
-1,230.07
722.14
7.00
-160.00
5,949,296.62
538,689.18
14
8,515.00
88.96
13.91
5,909.51
794.36
-1,210.42
794.36
7.00
-30.00
5,949,368.94
538,708.44
15
8,630.00
91.04
6.13
5,909.52
907.51
-1,190.43
907.51
7.00
-75.00
5,949,482.19
538,727.83
16
8,700.00
90.61
11.01
5,908.51
976.70
-1,179.99
976.70
7.00
95.00
5,949,551.42
538,737.90
17
8,825.00
87.62
2.79
5,910.43
1,100.66
-1,164.99
1,100.66
7.00
-110.00
5,949,675.45
538,752.25
18
8,950.00
87.65
11.55
5,915.60
1,224.46
-1,149.42
1,224.46
7.00
90.00
5,949,799.31
538,767.16
19
9,100.00
79.08
5.44
5,932.93
1,371.60
-1,127.38
1,371.60
7.00
-145.00
5,949,946.56
538,788.41
20
9,250.00
89.58
5.44
5,947.73
1,519.99
-1,113.26
1,519.99
7.00
0.00
5,950,095.00
538,801.74
21
9,430.00
97.65
15.14
5,936.37
1,696.40
-1,081.31
1,696.40
7.00
50.00
5,950,271.56
538,832.76
22
9,580.00
92.32
6.05
5,923.32
1,843.08
-1,053.91
1,843.08
7.00
-120.00
5,950,418.37
538,859.37
23
9,680.00
88.82
12.11
5,922.33
1,941.76
-1,038.13
1,941.76
7.00
120.00
5,950,517.12
538,874.63
24
9,880.00
88.85
358.11
5,926.42
2,140.43
-1,020.36
2,140.43
7.00
-90.00
5,950,715.86
538,891.34
25
10,200.00
88,94
20.52
5,932.68
2,454.14
-968.91
2,454A4
7.00
90.00
5,951,q29.82
538 941.12
1012512016 12:27.12PM Page 4 COMPASS 5000.1 Build 74
ConocoPhillips
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1L Pad
Well:
1L-15
Wellbore:
1 L-15L1-02
Design:
1 L-15L1-02_wp00
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1L-15
Mean Sea Level
1L-15 @ 118.00usft (Parker141)
True
Minimum Curvature
ri.s
BAKER
HUGHES
Planned Survey
Measured TVD Below Vertical Dogleg Toolface Map Map
Depth Inclination Azimuth System +N/-S +E/-W Section Rate Azimuth Northing Easting
(usft) V) V) (usft) (usft) (usft) (usft) (°/100ft) V) (usft) (usft)
Planned TD at 10200.00
1012512016 12:27:12PM Page 5 COMPASS 5000.1 Build 74
ConocoPhillips HIM
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1L Pad
Well:
1L-15
Wellbore:
1 L-15L1-02
Design:
1 L-15L1-02_wp00
Targets
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1L-15
Mean Sea Level
1L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Target Name
hit/miss target Dip Angle Dip Dir. TVD +NI-S +El-W Northing Easting
-Shape (1) (1) (usft) (usft) (usft) (usft) (usft)
1L-151-1_Fault3 0.00 0.00 5,941.00-5,360.221,138,894.48 5,949,262.00
- plan misses target center by 1139870.47usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
- Polygon
Point 1 5,941.00 0.00 0.00 5,949,262.00
Point 2 5,941.00 1.00 1.00 5,949,263.01
IL-15L1_Fault1_M 0.00 0.00 0.00-6,611.351,138,514.80 5,948,009.00
plan misses target center by 1139511.80usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
Rectangle (sides W1,000.00 H1.00 D0.00)
1L-151-1-01_Faultl_M 0,00 0.00 0.00-8,085.131,138,253.95 5,946,534.00
plan misses target center by 1139259.40usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
Rectangle (sides W1,000.00 H1.00 D0.00)
1L-15L1_Faultl 0.00 0.00 5,928.00-6,611.351,138,514.80 5,948,009.00
plan misses target center by 1139496.46usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
Polygon
Point 1 5,928.00 0.00 0.00 5,948,009.00
Point 5,928.00 1.00 1.00 5,948,010.01
1L-15L1-02_T01 0.00 0.00 5,933.00-3,842.441,139,157.56 5.950,781.00
plan misses target center by 1140128.52usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
Point
1,678,718.00
1,678,718.00
1,678,718.99
1,678,345.00
Latitude Longitude
70' V 20.105 N 140' 32' 53.233 W
70'V8.514N 140' 33'9.378 W I
1,678,092.00 70' 0' 54.586 N 140° 33' 23.098 W
1,678, 345.00
1, 678, 345.00
1,678,345.99
1,678,973.00
70'V8.514N 140' 33'9.378 W
70' 1' 34.456 N 140' 32' 39.250 W
1L-15 CTD Polygon Sou 0.00 0.00
0.00
-7,318.271,139,240.13
5,947,306.00
1,679,074.00 70' V 0.586 N 140' 32' 51.816 W
- plan misses target center by 1140240.92usft at
6380.00usft MD (5912.65 TVD,-826.65 N. -966.98 E)
Polygon
Point 1
0.00
0.00
0.00
5,947,306.00
1,679,074.00
Point2.
0.00
-130.08
-368.72
5,947,173.98
1,678,706.01
Point
0.00
-192.21
-536.07
5,947,110.97
1,678,539.01
Point
0.00
-378.39
-696.07
5,946,923.96
1.678,380.02
Point
0.00
-580.00
-774.13
5,946,721.96
1,678,303.03
Point
0.00
-898.95
-789.81
5,946,402.96
1,678,289.05
Point?
0.00
-1,245.77
-832.64
5,946,055.95
1,678,248.06
Point
0.00
-1,641.47
-897.72
5,945,659.95
1,678,185.09
Point
0.00
-2,231.27
-948.83
5,945,069.95
1,678,137.11
Point 10
0.00
-2,488.29
-950.18
5,944,812.95
1,678,137.12
Point 11
0.00
-2,403.13
-1,359.78
5,944,895.93
1,677,727.12
Point12
0.00
-1,903.52
-1,274.14
5,945,395.94
1.677,810.10
Point13
0.00
-1,438.66
-1,236.70
5,945,860.94
1,677,845.07
Point14
0.00
-827.83
-1,191.48
5,946,471.94
1,677,887.04
Point 15
0.00
-418.01
-1.148.32
5,946,881.95
1,677,928.03
Point 16
0.00
-112.79
-993.70
5,947,187.95
1,678,081.01
Point 17
0.00
135.99
-756.37
5,947,437.96
1,678,316.99
Point18
0.00
266.58
-484.65
5,947,569.98
1,678,587.99
Point19
0.00
368.47
-81.07
5,947,674.00
1,678,990.98
Point20
0.00
0.00
0.00
5,947,306.00
1,679,074.00
1 L-151-1_Fault3_M 0.00 0.00
0.00
-5,360.221,138,894.48
5,949,262.00
1,678,718.00 70' 1' 20.105 N 140' 32' 53.233 W
- plan misses target center by 1139885.81 usft at
6380.00usft MD (5912.65
TVD,-826.65 N,-966.98 E)
- Rectangle (sides W1,000.00 H1.00 D0.00)
1L-15 CTD Polygon Nod 0.00 0.00
0.00
-7,311.271,139,240.17
5,947,313.00
1,679,074.00 70° V 0.654 N 140° 32' S1.785 W
- plan misses target center by 1140240.92usft at
6380.00usft
MD (5912.65
TVD,-826.65 N,-966.98 E)
- Polygon
Point
0.00
0.00
0.00
5,947,313.00
1,679,074.00
Point
0.00
-75.99
-194.42
5,947,235.99
1,678,880.00
Point 3
0.00
9.52
-479.00
5.947,319.98
1.678,595.00
Point
0.00
246.78
-713.78
5,947,555.97
1,678,358.99
Point
0.00
622.80
-899.83
5,947,930.96
1,678,170.97
Point
0.00
977.12
-952.97
5,948,284.96
1,678,115.95
1012512016 12:27.12PM Page 6 COMPASS 5000.1 Build 74
ConocoPhillips
ConocoPhillips Planning Report
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Project:
Kuparuk River Unit
MD Reference:
Site:
Kuparuk I Pad
North Reference:
Well:
1L-15
Survey Calculation Method:
Wellbore:
1 L-151-1-02
Design:
1L-15L1-02_wp00
Well 1 L-15
Mean Sea Level
iL-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
BAKrER%•
HUGHES
Point
0.00
1,261.70
-868.47
5,948,569.95
1,678,198.94
Point 8
0.00
1,648.28
-588.41
5,948,957.97
1,678,476.91
Point 9
0.00
2,418.87
-494.35
5,949,728.98
1,678,566.88
Point 10
0.00
2,759.46
-409.55
5,950,069.98
1,678,649.86
Point 11
0.00
3,417.93
-294.08
5,950,728.99
1,678,761.82
Point 12
0.00
3,660.55
-216.80
5,950,971.99
1,678,837.81
Point 13
0.00
3,645.42
-1.85
5,950,958.00
1,679,052.82
Point 14
0.00
3,423.14
45.99
5,950,736.00
1,679,101.83
Point 15
0.00
3,069.33
2.12
5,950,382.00
1,679,059.84
Point 16
0.00
2,715.70
-75.74
5,950,027.99
1,678,983.86
Point 17
0.00
2,403.12
-161.39
5,949,714.99
1,678,899.88
Point 18
0.00
2,077.02
-149.11
5,949,389.00
1,678,913.89
Point 19
0.00
1,765.13
-177.75
5,949,076.99
1,678,886.91
Point20
0.00
1,459.80
-311.37
5,948,770.98
1,678,754.92
Point21
0.00
1.127.83
-515.13
5,948,437.97
1,678,552.95
Point22
0.00
925.99
-550.20
5,948,235.97
1,678,518.95
Point23
0.00
592.57
-475.94
5,947,902.98
1,678,594.97
Point24
0.00
390.71
-316.98
5,947,701.98
1,678,754.98
Point25
0.00
354.47
-81.15
5,947,667.00
1,678.990.98
Point26
0.00
0.00
0.00
5,947,313.00
1,679,074.00
1L-151-1_Fault2_M 0.00 0.00
0.00
-5,758.571,138,763.35
5,948,863.00
1,678,589.00 70' 1' 16.430 N 140' 32' 58.665 W
plan misses target center by 1139756.33usft
at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
Rectangle (sides W1,000.00 H1.00 D0.00)
1L-151-1_Fault2 0.00 0,00
5,923.00
-5,758.571,138,763.35
5,948,863.00
1,678,589.00 70° 1' 16.430 N 14W 32' 58.665 W
- plan misses target center by 1139741.00usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
- Polygon
Point 1
5,923.00
0.00
0.00
5,948,863.00
1,678,589.00
Point
5,923.00
1.00
1.00
5,948,864.01
1,678,589.99
1L-151-1-01_Faultl 0.00 0.00
5,992.00
-8,085.131,138.253.95
5,946,534.00
1,678,092.00 700 0' 54.586 N 1400 33' 23.098 W
- plan misses target center by 1139244.06usft at 6380.00usft MD (5912.65 TVD,-826.65
N,-966.98 E)
- Polygon
Point 1
5,992.00
0.00
0.00
5,946,534.00
1,678,092.00
Point
5,992.00
1.00
1.00
5,946,535.01
1,678,092.99
Casing Points
Measured Vertical Casing Hole
Depth Depth Diameter Diameter
(usft) (usft) Name (in) (in)
10,200.00 5,932.68 2 3/8" 2.375 3.000
1012512016 12:27:12PM Page 7 COMPASS 5000.1 Build 74
., -
ConocoPhillips
.eA..
ConocoPhillips
Planning Report
BAKER
HUGHES
Database: EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1 L-15
Company: ConocoPhillips (Alaska) Inc. -Kup2
ND Reference:
Mean Sea Level
Project: Kuparuk River Unit
MD Reference:
1 L-15 @ 118.00usft (Parker 141)
Site: Kuparuk 1 L Pad
North Reference:
True
Well: 1L-15
Survey Calculation Method:
Minimum Curvature
Wellbore: 1 L-15L1-02
Design: 1 L-15L1-02_wp00
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/-S
+E1-W
(usft)
(usft)
(usft)
(usft)
Comment
6,380.00
5,912.65
-826.65
-966.98
TIP
6,450.00
5,936.11
-866A6
-1,018.86
KOP
6,630.00
5,946.42
-869.79
-1,186.89
Start 40dls
6,700.00
5,946.03
-827.63
-1,242.75
End 40 dls, Start 7 dls
6,770.00
5,945.38
-780.87
-1,294.80
5
6,870.00
5.947.51
-707.30
-1,362.41
6
6,995.00
5,949.19
-605.97
-1,435.38
7
7,095.00
5,941.72
-519.64
-1,485.16
8
7,195.00
5,931.38
-429.28
-1,526.58
9
7,295.00
5,924.03
-334.41
-1.557.15
10
7,455.00
5,913.76
-176.87
-1,581.49
11
8,065.00
5,897.44
389.40
-1,396.36
12
8,365.00
5,901.08
650.71
-1,252.49
13
8,440.00
5.905.17
722.14
-1,230.07
14
8,515.00
5,909.51
794.36
-1,210.42
15
8,630.00
5,909.52
907.51
-1,190.43
16
8,700.00
5,908.51
976.70
-1,179.99
17
8,825.00
5,910.43
1,100.66
-1,164.99
18
8.950.00
5,915.60
1,224.46
-1,149.42
19
9,100.00
5,932.93
1,371.60
-1,127.38
20
9,250.00
5,947.73
1,519.99
-1,113.26
21
9,430.00
5,936.37
1,696.40
-1,081.31
22
9,580.00
5,923.32
1,843.08
-1,053.91
23
9,680.00
5,922.33
1,941.76
-1,038.13
24
9,880.00
5,926.42
2,140.43
-1,020.36
25
10,200.00
5,932.68
2,454.14
-968.91
Planned TO at 10200.00
1012512016 12:27:12PM Page 8 COMPASS 5000.1 Build 74
n_
a
(uygsn OOV) (+)uljoN/(-)ulnoS
I CUP PROD 1 L-15
ItiOt'111IIIp - WcBAttributes Max Angle & MD TD
Alaska. Inc. Wellbore API/l1Wi Field Name Wellbore Status ncl (') MD (ftKB) Act Dim (ftKB)
500292120400 KUPARUK RIVER UNIT PROD 46.58 6,700.00 6,705.0
•• Comment H2S (ppm) Date Annotation End Data KB-Grtl (ft) Rig Releas¢ Date
1L-15, 1011 W0162:15:37 PM 50 12/21/2015 Last WO: 34.80 10/24/1984
Vertical schematic (actual)
_...._.............._.__......._....._......_.._...... ....._._.._...._.__............._........._..
Annotation Depth (ftKB) Entl Dat¢
Last Tag: SLM 6,372.0 4/24/2015
Annotation
Rev Reason: TAG, H2S, GLV C/O, SET PLUG
CATCHER, CUT TUBING(3X)
Last Mod By End
& ppmven
Dale
10/5/2016
Hanger, Z7.6
asmg - ngs
Casing Description
CONDUCTOR
OD (in) ID (in)
16
15.060
Top (ftKB)
35.0
Set Depth (ftKB)
102.0
Set Depth (TVD)...
102.0
Wt/Len (I...
62.50
Grade
H-40
Top Thread
WELDED
Casing Description
SURFACE
OD (in) ID (in)
9 5/8
8.921
Top (ftKB)
34.3
Set Depth (ftKB)
3,475.0
Set Depth (ND)...
3,474.7
WBLen (I...
36.00
Grade
J-55
Top Thread
BTC
Casing Description
PRODUCTION
Do (in) ID (in)
7
6276
Top (ftKB)
34.3
Set Depth (ftKB)
6,704.0
Set Depth (TVD)...
A 265.1
WI/Len (I...
26.00
Grade
J-55
Top Thread
Tubing Strings
CONDUCTOR; 35.0-102.0
Tubing Description Stdng Ma... ID (in)
Upper Sele ctive 31/2 2.992
Completion
Top (ftKB)
0.0
Set Depth (ft..
6,285.3
S¢t Depth (ND) (...
5,962.4
Wt (Ibfft) Grade
9.30 L-80
Top
EUE
Connection
8rd Mod
Completion Details
Mandrel; 2,424.5
Top (ftKB)
Tap (ND) (ftKB)
Top Incl
(') Item Des
Co.
Nominal ID
(in)
27.6
27.6
0.00
Hanger
Tubing Hanger, FMC TC-IA-EN, 7-1/16" x 3-1/2" EUE 8rd
2.950
Box x Box
SURFACE; 34.3-3,475.0-
6,027.5
5,755.8
35.60
Locator
Locator Sub, Baker, GBH-22
3.000
6,028.5
5,756.6
35.56
Seal Assembly
Seat Assembly, Baker, 80-40 (Sea[ Assy 21.54' Total
3.000
Length)
Mandrel; 3,494.0
6,035.3
5,762.2
35.26
Polished Bore
Receptacle
PBR, Baker, 8040 (shear release pinned at 40K)
4.000
6,079.6
5,798.4
35.44
Nipple - DB,
X Nipple, HES, 2.813"
2.813
XN, DS, D
MaMral; 4,373.6
6,213.3
5,906.0
37.51
Carbide Blast
Rings
Blast Joint. 9.3# L-80 31/: EUEM box x 31/. HYD 511 pin
2.992
6,245.0
5,931.0
38.30
Carbide Blast
Rings
Blast joint 3%9.3# L-80 HYD 511 box x pin
2.992
Mandrel 5,062.8
6,283.8
5,961.3
39.27
Locator
Locator Sub, Baker, GBH-22
3.000
6,284.3
5,961.6
39.28
Seal Assembly
Seal Assembly, Baker, 80-40 (seal assembly 11.77')
3.000
McMrel; 5,5946
Tubing Description String Ma... ID (in) Top (ftKB) Set Depth (5% Set Depth (ND) I... Wt (Ib/fQ Grade Top Connection
Lower Completion 5.96 2.992 6,285.3 6,345.4 6,008.4 8rd EUE
Completion Details
Top (ftKB)
Top (ND) (ftKB)
Top Incl
(") Item Des
Com
Nominal ID
(n)
6,288.6
5,965.0
39.39
SBE (Seal
Baker 804012.26'SBE
4.000
Mandrel; 5,970.7
Bore
Extension)
6,307.8
5,979.7
39.86
Deployment
Upper Wedge Assembly #2
2.992
Sleeve
Locator, 6,027.5
6,321.8
5,990.4
40.21
Nipple -DB,
XN, DS, D
GX Nipple, HES, 2.813", SN: 7256
2-813
Seal Assembly; 6,028.5
Patished Bore Receptacle;
6,035.3
6,327.5
5,994.8
40.35
Deployment
Sleeve
Lower Wedge Assembly#1
2.992
Packer (Tubing); 6,057 ]
6,341.5
6,005.4
40.6
Nipple - DB,
GX Nipple, HES, 2.813" w/PXX plug and prong SN:
2.813
XN, DS, D
6,344.9
6,008.01
40.77
Mule Shoe
WLEG 4.57" OD x 3" ID. Drifted 2.91".
2.992
Other In Hole
(Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (ND)
Top 1ncl
Mandrel; 6,122.9
Top (ftKB)
(ftKB)
(') Des
Com
Run Date
ID (in)
6,480.0
6,108.0
43.44 Fish
Packer& tubing tail from 6313' milled and chased 10/11/2016
down to 6480'. Prior to Setting Tandem Wedge & F
Perm Packer
6,520.0
6,136.9
44.24 FISH
JK Running Tool 4.5" x 1.2" OD, lost 8/24/2004 8/24/2004
Mandrel; 6.1942
6,526.0
6,141.2
44.38 FISH
Parts of 2 Broken GL In Rathole; Also Trash around 2/14/1990
Mandrels
Carbide Blast Rings; 6,213.3
Perforations & Slots
IPERF; B 235.0-6,248.0-
-
Shot
IPERF; 6,246.0-6,26B.0,_
Carlide Blast Rings; 6.245.0
Top (ftKB)
Btm (ftKB)
Top (ND)
(ftKB)
Btm (TVD)
(ftKB)
Zone
Date
Dens
(shoL4f
t)
Type
Com
6,235.0
6,248.0
5,923.1
5,933.4 C4,
1 L-15
3/7/1985
12.0
IPERF 5"
Scalloped Guns, 120
deg.
phasing
Locator,6,283.8
6,248.0
6,268.0
5,933.4
5,949.0 G4,
1L-15
317/1985
12.0
IPERF 5"
Scalloped Guns, 120
Seal Assembly; 6,284.3
deg.
phasing
Packs,(TuNng); 6,285.3
6,393.0
6,416.0
6,044.1
6,061.2 A-5,1L-15
3/7/1985
4.0
IPERF 4"JJ11,
120 deg.
seE (Seel Bore Extension);
phasing
j
6,288.6
XO Reducing (Tubing); 6 298.0
Mandrel Inserts
Sl
a0
Depbyment Sleeve; 6,307.8
Nipple - OB. %N, OS, 0; 6,321.8
on
N Top (ftKB)
Top(TVD)
(ftKB)
Make
Model
OD (in)
Seine
Valve
Type
Latch Port
Type
Size
(in)
TRO Run
(psi)
Run Dale
Co.
1 2,424.5
2,424.3
Camco
MMG
1112
DMY
10/14/2016
2 3,494.0
3,493.7
Camco
MMG
1 112
SOV
10/14/2016
Depbyment Sleeve; 6,327.5
3 4,373.6
4.337.8
Camco
MMG
1112
DMY
10/1412016
Nipple - DB, XN, DS, 0; 6,341.5
4 5,062.9
4,944.3
Camco
MMG
1 1/2
DMY
10/14/2016
Mule SMe; 6,349.9
5 5,594.E
5,400.6
Camco
MMG
1 11/2
DMY
1011412016
IPERF;6,393.0-6,416.0-
6 5,970.7
5,709.3
Camco
MMG
11/2
DMY
10/142016
7 6,122.9
5,833.6
Camco
MMG
11/2
DMY
1011412016
FISH; 6.520.0
8 6,194.2
5,890.8
Camco
MMG
1112
DMY
10/14/2016
FISH; 6,526.0
PRODUCTION; 34.3-6.704.0
1 L-15 CTD Proposed Schematic
1d"82.E4 H40
=_hoe � 162` RED
1L&8" 32 J-55
shoe a@ 3475' MID
C4-sand peas
8235-B268' MID
03C' h'D praposec
G4'vS depth
AE-sard per-
t}393-0416' M4D
r 2W J-55 shoe
@ UD4' 100
3-1/2" 9.3# L-80 EUE Ord Tubing to surface
3-112" Camco gas lift mandrels @ TBD
Baker packer @ XXXX' MD
Production Mandrel at XXXX' MD
Baker packer at XXXX MD (below C-sand perfs)
Baker 5BE atXXXX' MD
3-112" X-nipple -- xxxx' tVID (2.812" min ID)
Northem Solutions WEDGE (see details)
1L--15L7 32
TD @ 102CU MID
Liner top @ 3326 MID
1L-1E1-1-D1
TD I t73C9' A.1r7
Linertop Ea3tY R1D
1 L-19
1 D.2L9 MD
Liner Billet !mil 6540' 1610
TRANSMITTAL LETTER CHECKLIST
WELL NAME:
PTD:
'Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional
FIELD: && Va — POOL:
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
/
LATERAL
No. — API No. 50-C)�q - I , a oy - M -s�(z.
1/
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69)
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
- -� from records, data and logs acquired for well
(name onpermit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL - 490100
PTD#:2161380 Coml
Administration 17
1
Appr Date
PKB 10/28/2016
Engineering
7
8
9
10
11
12
13
14
15
16
18
I19
I20
I; 21
22
23
24
25
26
Appr Date I28
GLS 11/10/2016 29
30
31
Geology
Appr Date
PKB 10/28/2016
Initial
Well Name: KUPARUK RIV UNIT 1L-151-1-02 _Program DEV
DEV / PEND GeoArea 890 Unit 11160 On/Off Shore On
Well bore seg ❑�
Annular Disoosal n
Nonconven. gas conforms to AS31.05.030(j.1_.A),0.2.A-D)
NA_
Permit_fee attached_ _ _ _ _
NA
Lease -number appropriate
Yes
ADL0025659,.entire wellbore-
.Unique well name and number
Yes
KRU 1 L-15L1-02
Well located in_a_ defined -pool
Yes
KUPARUK RIVER, _KUPARUK _RIV OIL - 4901.00,_governed by Conservation_ Order No. 432D.
Well located proper distance_ from_ drilling unit_boundary
Yes
CO 432D contains no spacing restrictions with respect.to drilling unit boundaries. - - -
Well located proper distance from other wells_
Yes
CO 432D has no interwell_spacing-restrictions..-
Sufficient acreage -available in drilling unit_
Yes
If deviated, is_wellbore plat inc_lu_ded
Yes
Operator only affected party ..
Yes
Wellbore will be more than 509 from an external property line where_ ownership or landownership_ changes.
Operator has -appropriate bond in force - - -
Yes
Permit- can be issued without conservation order_
Yes
Permit_can be issued without administrative_appr_oval
Yes
Can permit be approved before 15-day wait_
Yes
Well.located within area and strata authorized by Injection Order # (put_ 10# in comments) (For_
NA_
- - - - _
All wells -within 1/4_mile_area.of review identified (For service well only)_
NA_
--------------------------------------
Pre-produced injector: duration_of pre production less than 3 months_ (For service well only)
NA_
Conductor string -provided - - -
NA
Conductor set in mot_herbore 1 L-15
Surface casing protects all known USDWs - - - - - -
NA_
Surface casing set and fully cemented in moth_erbore_1L-15._
CMT vol adequate to circulate -on conductor_ & surf-csg ...
NA
CMT. vol adequate_ to tie -in -long string to -surf csg- -
NA
CM.T will coverall known _productive horizons- - -
Yes -
Casing designs adequate for C,_T, B &_ permafrost_ - - - -
Yes
2 3/8" slotted _liner _will _b_e set in the lateral.... Extending up past the window.
Adequate -tankage or reserve pit - - ..
Yes
Rig has steel pits. All drilling waste will be transported to approved_ disposal wells._ - - - - .
If a, re -drill, has a 1.0-403 for abandonment been approved
NA_
Motherbore not abandoned._
Adequate_wellbore separation _proposed_ - - - _
Yes
Proximity analysis performed. No issues. - - - -
If_diverter required, does it meet_ regulations- - - - - - - - -
NA_
wellhead -in place. _CT BOPE will be place -on -top production tree,
Drilling fluid_ program schematic_& equip_list_adequat_e_ - -
Yes .
Max formation pressure = 3702 psi (12.1 ppg EMW) Will drill with 8.6 ppg mud_ but maintain 11.8ppg with MPD
BOPEs,_do they meet regulation - - - - - - - - - - - - - - - - -
Yes
CDR3 has 5000 psi BOPE - - - - - - - - - - - - - - - - - - - -
BOPE-press rating appropriate; test to -(put psig in comments)_
Yes
MASP = 3114_pis_ Will test BOPE to 3500 psi (annular_to 2500 pis)
Choke manifold complies w/API_ RP-53 (May 84)_ - - - - - -
Yes - -
- - - -
Work will occur without operation shutdown_ - - - - - - - - - - - - - - - - - - _
Yes -
- - - -
Is presence of H2S gas probable_
Yes
H2s-on-pad._ Rig has sensors and alarms. - - _ -
Mechanical_condition of wells within AOR verified (For service well only) - -
NA
- - - - - - - - - - - - - -
Permit_can be issued w/o hydrogen -sulfide measures - - -
No
Wells _on_1L-Pad are-H2S-bearing.- H25 measures required. - - - - - - -
Data_p_resented on potential overpressure zones- - - -
Yes
Maximum potential -reservoir pressure -is 12.1 ppg_EMW;_will be drilled_ using 8.6_ppg mud and MPD technique.- _
Seismic_analysisofshallowgas_zones, - - - - - - - - - - - - -
NA
- - _ - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - - - - -- -- - - - _ _ - - _ - .
Seabed condition survey_(ifoff-shore)- - - - - - _ _ - _ - - - -
NA_
- - _ _ _ _ _ _ _ _ - - - - - - - - -
Contact name/phone for weekly -progress reports_ [exploratory only] - _ - - - - - _ _
NA_ _ _ _ _
_ _ _ Onshore development lateral to be drilled_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - -
Geologic Engineering Public 1 L-15L1-02 is third planned lateral. Will target A4/A5 sands north of the motherbore existing BHL. GIs
Commissioner: Date: Commissioner: Date Co ner Date
t I �1���