Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout216-169Carlisle, Samantha J (DOA) From: Loepp, Victoria T (DOA) Sent: Tuesday, December 19, 2017 9:16 AM To: Carlisle, Samantha J (DOA) Subject: FW: Withdraw 03-27A Permit (PTD #216-169) and 03-27 Sundry (#316-621) Please handle From: Lastufka, Joseph N [mailto:Joseph.Lastufka@bp.com] Sent: Thursday, December 14, 2017 9:00 AM To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov> Cc: Davies, Stephen F (DOA) <steve.davies@alaska.gov>; Hyatt, Trevor <Trevor.Hyatt@bp.com>; Staudinger, Garret <Garret.Staudinger@bp.com> Subject: Withdraw 03-27A Permit (PTD #216-169) and 03-27 Sundry (#316-621) Victoria, Please withdraw 03-27A Permit to Drill (PTD #216-169) and 03-27 Plug for Redrill (Sundry # 316-621). If you have any questions, please don't hesitate to let me know. Thank you, Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 ----------------------------------------------------------------------------------------- W f A BP Exploration Alaska1900 E. Benson Blvd.lRoom: 788DIAnchorage, AK Davies, Stephen F (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Thursday, December 14, 2017 9:00 AM To: Loepp, Victoria T (DOA) Cc: Davies, Stephen F (DOA); Hyatt, Trevor; Staudinger, Garret Subject: Withdraw 03-27A Permit (PTD #216-169) and 03-27 Sundry (#316-621) Victoria, Please withdraw 03-27A Permit to Drill (PTD #216-169) and 03-27 Plug for Redrill (Sundry # 316-621). If you have any questions, please don't hesitate to let me know. Thank you, Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 ----------------------------------------------------------------------------------------------- r A BP Exploration AlaskaJ900 E. Benson Blvd.lRoom: 788DIAnchorage, AK 1 PT-,o a e 6—/ C 9 Loepp, Victoria T (DOA) From: Loepp, Victoria T (DOA) Sent: Thursday, December 07, 2017 9:53 AM To: 'Lastufka, Joseph N' Cc: zachary.browning@bp.com Subject: RE: Updated BOPE Schematic for the following wells Approval is granted for the change in BOP stack for CDR2 for the listed wells outlined below. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. Loepp(a)a laska.gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria. Loepp@alaska.gov From: Lastufka, Joseph N [mailto:Joseph.Lastufka@bp.com] Sent: Wednesday, November 29, 2017 9:57 AM To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov> Subject: Updated BOPE Schematic for the following wells Victoria, As Zach Browning indicated on Monday, we are changing the BOP stack for Nabors CDR2. This change will affect the approved and out for approval Permit to Drills. Please see list below for well name and PTD # (if available): 03-15C (PTD #217-137) 03-27A (PTD #216-169) 07-03B (currently out for approval) 16-21A (currently out for approval) 17-11A (PTD #217-001) P-041_2 (PTD #217-120) Q-06B (currently out for approval) Thank you, Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 Well Bighole CDR2-AC 4 Ram BOP Schematic Date 21-Nov-17 Quick Test Sub to Otis = ----------- MW Top of7"Otis O.Oft—•—•—•——•—.—.— _ _.—.—•_._._ 4 -- -- CDR2 Rig's Drip Pan Distances from top of riser Excluding quick -test sub Top of Annular 8 0 i Top of Annular Element 6.7 ft Bottom Annular 8.0 ft CL Blind/Shears 9.3 It IN" CL 2-3/8" Pipe/Slips 10.1 ft i 61 62 Kill Line CL 2-3/8" x 3-1/2" VBRs 12.6 ft b CL 2-3/8" Pipe/Slips 13.4 ft No 4--- 7-1116" 5k Flange X 7" Otis Box ARE Hydril 71/16" Annular BS CL of Top Swab 16.0 ft Swab 4e T1 CL of Flow Cross 17.4 ft Master CL of Master 18.8 ft LDS IA OA LDS Ground Level II T2 iC'i iak,rr.- L int= Test Pump Hose THE STATE 'ALASKA GOVERNOR BILL WALKER John Egbejimba Drilling Supervisor BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Alaska ®il and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 03-27A BP Exploration (Alaska), Inc. Permit to Drill Number: 216-169 Surface Location: 780' FSL, 21' FWL, Sec. 11, T10N, R15E, UM Bottomhole Location: 385' FSL, 2334' FWL, Sec. 02, TION, R15E, UM Dear Mr. Egbejimba: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy P Foerster Chair DATED this day of January, 2017. STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMMIT PERMIT TO DRILL 20 AAC 25.005 ECEI VE® DEC 2 0 2016 1 a. Type of Work: 1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ElService - Disp El 1c.Specifyif ell is proposed for: Drill ElLateral ❑ Stratigraphic Test ❑ Development - Oil 0 • Service - Winj ❑ Single Zone 0 [Exploratory • Coalbed Gas' Gas Hydrates El Redrill 0 • Reentry ❑ - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket 0 • Single Well ❑ 11 Well Name and Number: BP Exploration (Alaska), Inc Bond No. 29S105380 PBU 03-27A 3 Address: 6. Proposed Depth: . 12Field/Pool (s ): P.O. Box 196612 Anchorage, AK 99519-6612 MD: 12843' • TVD: 8606'ss PRUDHOE BAY, PRUDHOE OIL 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): ADL 028327, f pf, p ZWI,* Surface: 780' FSL, 21' FWL, Sec. 11, T10N, R15E, UM 8. Land Use Permit: 13. Approximate spud date: Top of Productive Horizon: 5178' FSL, 294' FWL, Sec. 11, T10N, R15E, UM 74-017 February 15, 2017 - 9. Acres in Property: 2560 14. Distance to Nearest Property: Total Depth: 385' FSL, 2334' FWL, Sec. 02, T10N, R15E, UM 18550 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 62 feet 15. Distance to Nearest Well Open Surface: x- 713298 . y- 5936820 Zone - ASP 4 GL Elevation above MSL: 28.72 feet' to Same Pool: 16. Deviated wells: Kickoff Depth: 10240 • feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 110 degrees Downhole: 3234 ' Surface: 2376 ' 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casin Weight Grade Coupling Length MD TVD MD TVD(including stage data 4-1/4" 3-1/2"x3-1/4" 9.3#/6.6# 13Cr85 STLITC-I1 2878' 9965' 8332'ss 12843' 8606'ss 155 sx Class'G' x2-7/8" /6.5# 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): 1 Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 1 10825 9222 10394 10394 8806 10366 Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20" 1850# Poleset 35 - 115 35 - 115 Surface 2373 13-3/8" 2000 sx CS III, 400 sx CS II 34 - 2406 34 - 2406 Intermediate 10172 9-5/8" 500 sx Class'G', 300 sx CS 1 32 - 10204 32 - 8621 Production Liner 7149 7" 340 sx Class'G' 8160 7020 Perforation Depth MD (ft): 10230 - 10357 Perforation Depth TVD (ft): 8647 - 8770 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Tempel, Joshua from without prior written approval. , MC-Le,.AL, �cr- Email •>2AA Joshua.Tempel@bp.com Printed Name John Eqbejimba Title Drillinq Supervisor Signature ,�, >� —�; Phone +1 907 564 4139 Date Pf b ( 7 Commission Use Only Permit to Drill j / J Number: �+ _ !C3 i API Number: 50- 029-21109-01-00 Permit Approval Date: � I � See cover letter for other r requirements: Conditions of approval : If box is checked, well may not be used to explore for, test, or produce Coalbed methane, gas hydrates, or gas contained in shales: Er f Other: %�� P f .L fo 3 d Lco /, Samples req'd: Yes ❑/ No Ed Mud log req'd: Yes ❑ No C� s4✓ �G�/ r�VGtH2S measures Yes Q No ❑ , Directional svy req'd: Yes [ No El �� Spacing exception req'd: Yes ❑ No 50 Inclination -only svy req'd: Yes ❑ No w J Post initial injection MIT req'd: Yes ❑ No APPROVED BY Approved by: /7� tT/�_,�— COMMISSIONER THE COMMISSION Date: vJv fI / -`i T ORIGINAL Form 10-401 Revised 11/2015 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) Submit Form and Attaghments in Duplicate /2 2 -z • /4, To: Alaska Oil & Gas Conservation Commission From: Josh Tempel CTD Engineer Date: December 19, 2016 Re: 03-27A Permit to Drill Request. Obp 03-27A will be drilled from well 03-27 by the Nordic 2 Coiled Tubing Drilling rig on or around Feb 15th, 2016. The 03-27A sidetrack will exit through the existing 7" liner and kick off in the Ivishak, targeting Ivishak reserves. The proposed sidetrack is a —2,610' horizontal Ivishak producer targeting unswept reserves between injection sweeps. The lateral will be completed with a 3-1/2" X 3-1/4" X 2- 7/8" 13Cr-85 liner which will be fully cemented and perforated. Rig Work (scheduled to begin February 15`h' 2017) 1. MIRU and test BOPE 250 psi low and 3,500 psi high. (MASP 2,376 psi) 2. Mill 3.80" window and 10' of rathole. Swap well to drilling mud. 3. Drill build: 4-1/4" OH, 233' (35 deg DLS planned). 4. Drill lateral: 4-1/4" OH, 2,370' (12 deg DLS planned). 5. Run 3-1/2" x 3-1/4" X 2-7/8" 13Cr-85 liner leaving TOL at 9,965' MD. 6. Pump primary cement job: 32 bbls, 15.3 ppg, final TOC at TOL* 7. Run cased hole log. 8. Run guns and perforate —500' 10. Freeze protect well to 2,500' MD. 11. RDMO. Post -Rig Work 1. O Re -install wellhouse 2. F Liner Lap Test to 2400 si 4. S Set 45KB liner top packer if needed " 5. F Test liner top packer if needed 6. T Flow Back Test * Approved alternate plug placement per 20 AAC 25.112(i) Mud Program: • Milling/drilling: minimum 8.4 ppg solids free fluid for milling window and drilling (513 psi over -balance). Disposal: • All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to G&I at DS 4 or Pad 3 at DS 6. • Fluids >1 % hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to G&I. • Fluids with solids that will not pass through 1/4" screen must go to G&I. • Fluids with PH >11 must go to G&I. Hole Size: • 4-1/4" From 10,175' MD to 12,843' MD Liner Program: • 3-1/2", 9.3 Ib/ft, 13Cr-85, STL liner 9,965' MD — 10,190' MD • 3-1/4", 6.6 Ib/ft, 13Cr-85, TC-II Solid liner 10,190' MD — 12,250' MD • 2-7/8", 6.5 Ib/ft, 13Cr-85, STL line 12,250' MD — 12,843' MD - • A minimum of 32 bbls of 15.3 ppg cement will be used for liner cementing (TOC planned to TOL). • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A crossover shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 1100, inclination at kick off point is 150. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property — 18,550'. • Distance to nearest well within pool — 65'. Logging: • MWD directional, gamma ray, and resistivity will be run over all of the open hole section. • Cased hole GR/CCL/RPM logs will be run to confirm PBTD and determine fluid contacts. Perforating: • 2" Millennium, 6 spf, pert guns. • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A crossover shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti -Collision Failures: None Hazards: • 03-27A is considered an H2S pad. • Latest 1­12S reading on parent bore 03-27A was 180 ppm on 04/17/16. • The lost circulation risk in 03-27A is considered to be medium. No expected fault crossings. Potential for losses to parent wellbore. Reservoir Pressure: • The reservoir pressure on 03-27A is expected to be 3,234 psi at 8,578' TVDSS (7.25 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,376 psi. • An EMW of 8.4 ppg for this well will provide 513 psi over -balance to the reservoir. Josh Tempel CC: Well File CTD Engineer Joseph Lastufka WELLHEAD = MCEVOY ACTUATOR = OKB. ELEV = 62' BF. ELEV = KOP = 2756 Max Angle Datum MD = __ Datum TVD = 880Y SS PROPOSED 03 _27A SA NOTES: WELL E' CHROME TBG &LNR• MAMA X DLS: _ 13-3/8- CSG, 72#, L-80 BTC, ID = 12.347" 24" 5-1/2" TBG, 17#, 13CR 80, .0232 bpf, D = 4.892" 3535' TOP OF 7" LNR 366W Minimum ID = _" @ ' 7" SCAB LNR, 29#, M80/L-80, .0371 bpf, ID = 6.184" I 9890' TOP OF 7" LNR—I 9890' TOP OF 3-1/2" X 3-1/4" X 2-7/8" LNR 9966' 14-1/2" TBG, 12.6#, 13CM80, .0152 bpf, D = 3.958" 1 3-1/2' LNR, _#, L-80 STL, .0087 bpf, D = 2.992" 9-5/8" CSG, 47#, L-80 BUTT, D = 8.681" 2193' j—� 5- yr HES X NP, D = 4.562" 3535' j—�5-1/2" X 4-1/2" XO, D = 3.958" 3668' J—� s S/8" x r HGR w lT1�ACK SLy. D = s.1 sa" GAs 1 F T MANr]RR R ST MD TV D I DEV TY PE V LV AT Pow DATE 1 3882 3796 28 CA-KBG-2-LS DOME INT 16 05/27/15 2 6472 5786 42 CA-KBG-2-LS SO INT 24 05/27/15 3 H5 7760 6704 46 CA-KBG-2-LS DAY INT 0 07/31/10 8713 7380 43 CA-KBG-2-LS MY Y INT 0 07/31/10 9708 8160 27 CA-KBG•2-LS DMY INT 0 07/31/10 9890' 9-5/8" X 7' BOT SHORTY HYORAIJLIC HGR _ J 7" X 4-1/2" BKR S-3 PI<R D = 4.00" 9966' 3.70" DEPLOY SLV, D = 3.00" 9970' 4-1 /2 HIES X NIP, D = 3.813" BEHND C T LNR 9976' 3-1/2" _ X NP, D = 2.813" 9992"7 9992' —�4 1/2" WLEG, D= 4.00" BBOND CT LNR 9966' E—M TT LOGGED 10/11l00 10190' 1019 - 3 1 /2" X 3-1 /4" XO. D = 2. 786' 1 10203' 1 112" X 7" BKR DELTA WHIPSTOCK (XX/XX/XX) ! 10240' 7" LNR, 29#, L-80, .0371 bpf, D = 6.184"—10240' PERFORATION SLMMARY REF LOG: ON XX/XX/XX ANGLE AT TOP PERF: " § ' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL OpNSxg DATE SQZ 3-1/4' LNR, 6.6#, L-80 TC11, .0079 bpf, D = 2.85' 12260' PBTD — 7/8" LNR, 6.5#, 13-CR TH51 1, .0058 bpf, ID = 2A41" 1286W 10233' —j r MARKER JT 7" MLLOUT WIDOW (03-27A) PUP JT w /RA TAG 12250' 3-1/4" X 2-7/8" XO, ID = 2.377" PUP JT w /RA TAG DATE REV BY COMMENTS DATE REV BY COMMENTS 05121/84 ORIGINAL COMPLETION 04/20/00 LAST WORKOVER CM (03-27A) 06/29/16 JMD BOLT PROPOSED PRLAHOE BAY UNIT WELL 03-27A PERMT No: API No: 50-029-21109-01 SEC 11, T10N, R15E, 780' FSL & 21' FWL BP Exploration (Alaska) 1:t = FMC WELLHEAD= MCEVOY' ACTUATOR = BAKER C OKB. ELEV = 62' BF. G-EV = KOP = 275Y Max Angle = 46' @ 74W Datum MD = 1045Y Datum ND = 8800' SS 113-3/8" CSG, 72#, L-80, D = 12.347" I 24OW 5-1/2- TBG, 17#, 13CR-80, _0232 bpi, D = 4.892" 3535' TOP OF 7" LNR 36W Minimum ID = 2.80" a@ 10330' 4-1/2" MILLED XXN PLUG T SCAB LW 29#, L-80, .0371 bpf, D= 6.184' — TOP OF 7- LNR 4 988T I4-1/2' TBG, 12.6#, 13CR-80, .0152 bpf, D = 3.958" 9992, 9-5/8- CSG, 47#, L-80, D = 8.681' 10203' TOP OF 4-1/2" TBG 1-1 10320' 14-1/2" TBG, 12.6#, 13CR-80, .0152 bpf, D= 3.958' 1—{ 10333' PERFORATION SUMMARY REF LOG: BHCS ON 05/15/84 ANGLE AT TOP PEW: 15 @ 10224' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz DATE SEEPAGE 2 FOR PERFORATION DATA F ET 10773' 7" LNR, 29#, L-80, .0371 bpf, D = 6.184" 1081 T O3 _z 7 SA► _ I NOTES: 4-12" & 5-12" CHROME TBG 2193' 1-15-1/2- HES X NP, D = 4.562" 3535' 1--15-1/2" X 4-1/2" XO CAA S I FT KM KWIP 7 c STI MD I TVDJ DEV TYPE VLV PORT DATE 1 3882 3796 28 CA-KBG-2-LS DOME NT 16 05/27/15 2 6472 5786 42 CA-KBG-2-LS SO NT 24 05/27/15 3 7760 6704 46 CA-KBG-2-LS DMY NT 0 07/31/10 4 8713 7380 43 CA-KBG-2-LS DMY IYT 0 07/31/10 5 9708 8160 27 CA-KBG-2-LS I DMY Kr 0 07/31/10 9946' 1-17" X 4-1/2" BKR S-3 PKR, D = 4.0' 997W 1-�4-1/2- HES X NIP, D = 3.813" 9992' 9966' fl_MD TT LOGG®10/11/00 10320' �7" X 41/2" BKR FB 1 PKR 1033—W 4-1/2" HES XN NIP, MILLED THRU XXN PLUG w /2.80" MILL (03/31/16) 10333' - R 1/2" WLEG, D = 4.0- 10331' (3MD 7T NOT LOGGlD 1036W CTM FISH: BOT 2.80' OD X .44' LONG LE r HANDED DIAMOND PARABOLIC MILL SEE PICS N WELLS FOLDER (03/27/16) 10394' TOP OF CEMENT NT 10503' TOP OF SAND DATE REV BY 05/21/84 PRUCHOE BAY UNIT WELL 03-27 PERMIT No:'1840620 API No: 50-029-21109-00 SEC 11, T1OR R15E. 780' FSL 8 2V FWL COMMENTS DATE REV BY COWA94TS ORIGINAL COMPLETION 04/28/16 CJS/JMD EDITS TO MILLED XXN PLUG (03/31/1 04/20/00 LAST WORKOVER 04/28/16 CJS/JMD ADPERFS (04/25-26/16) 05/04/15 RCT/JMD GLV aO (04127/15) 05/31/16 TBD/JMD GLV C/O (0&27/16) 09/08/15 JLS/JMD REMOVED SAND (08/16/15) 09/08/15 ADDED XXN PLUG FROM 2001 BP Exploration (Alaska) 104/05/161 JTGJMDI MILLED PLUG/SET FISH (3127/16) 03-27 PERFORATION SL* MARY REF LOG BHCS ON 05/15/84 ANGLE AT TOP PERF: 15 @ 1025Y Note: Refer to Production DB for historical perf data SIZE SPF INT RVAL Opn/Sgz BATE 3-1/8" 4 10224 - 10262 S O4125/88 3-3/8" 6 10230 - 10250 O 04/26/16 3-3/8" 6 10250 - 10280 O 03/13/01 2-1/8" 4 10250 - 10282 O 10/18/94 2-1/8" 4 10270 - 10282 S 01/15/89 2-1/8" 6 10270 - 10282 S 06/19/92 2-112" 4 10270 - 10282 S 06/19/92 2-112" 4 10270 - 10282 S 10/14/94 2-112" 4 10286 - 10292 S 10/14/94 2-1/8" 4 10286 - 10308 O 10/18/94 3-3/8" 6 10290 - 10318 S 04/25/88 2-1/8" 4 10290 - 10318 S 01/15/89 2-1/8" 6 10290 - 10318 S 06/19/92 2-112" 4 10290 - 10318 S 06/19/92 2-112" 4 10298 - 10310 S 10/14/94 2-1/2" 2 10350 - 10360 S 10/14/94 2-1/2" 6 10350 - 10355 O 04/25/16 2-112" 6 10352 - 10357 O 04/25/16 2-112" 4 10368 - 10378 S 06/19/92 2-112" 2 10381 - 10398 S 10/14/94 2-1/2" 4 10388 - 10398 S 06/19/92 3-3/8" 1 10503 - 10578 S 04/25/88 3-3/8" 1 10547 - 10569 S 04/25/88 3-3/8" 1 10588 - 10602 S O4125/88 PRIJOHOE BAY UNIT WELL 03-27 PERMT No:/1840620 API No: 50-029-21109-00 SEC 11, T10N, R15E, 780' FSL & 2T FWL DATE REV BY COMMENTS DATE REV BY COWEWS 05/21/84 ORIGINAL COMPLETION 04/28/16 CJS/JMD FDffS TO WLED XXN PLUG (03/31/1 04/20100 LAST WORKOVER 04/28/16 CJS/JMD ADPERFS (04/25-26/16) 05/04/15 RCT/JMD GLV CIO (04/27/15) 05/31/16 TBLYJMD GLV GO (05127/16) 09/08/15 JLS/JMD REMOVED SAND (08/16/15) 09/08/15 QJMEADDED XXN PLUG FROM 2001 BP Exploration (Alaska) 04/05/16 JTC/JMDj NiL.LED PLUG/SET FISH (3/27/16) _ 01 R- 0 J CL Q � v � o a o Q � a _ N 0° Cl) C N M O r' L O L Cl) Q ti ti N N CDw am G�i V � Z a`aoo a m 0 fA OD _ z 4 = 3 ) Sign� ^ \ �z in § zo ~� ~` 2 \ $ � / § ) .o -o 75 }� o \m __ _ / _2§ \\ ))® -5o w §}) ]ƒ\ j/» ` - ; E F /)//§E §/Fn j _� 5 ] R .. . )�k ]]A / ko 2 � f¥ . . en )k)k ( ] - 7 & f R Ln J2«f{; a - a . _ kk§}jk \\� \\\ 8 \ ` . . z ƒ �/ - c z «c jL / J / b _ . � / 3IL #E§ A 9 7 ° co Li \ { \ #)� » o z j J $ § ) . z . f£S . } . j k - & E y .. § E ( § � ! |£« «E§ ci , ± & ()/ / k § °°° }<F- / G _ c �) ) } m \ \ ) - / } \ - co J® ° <0 z&, T ° _ _ o = <o i0M mm <\ f� . =c%%x <zz o z��o== { a 2 ° (@ -- o \ / }cn � § §a¢(- �e@a� £ \£ £�aa■ § AK° _ }LL }t { u(��; a a a § O ❑7 O o O o O O LO m W O N r-, � O O o O O O o M O m O O co m o N (h o 0 0 0 o N 0 N o o M M o m a J NOWa — m LL o 0 �_ LO o c/) o 04 m N Lo N r- V m LD V m V f� V V n M m m N N LD (D m Q. O th m LA m m m m o M r- h m o (D o to o ID N a m (D O N N N N N N N Cl) M Cl) M M M (J F� O > ► m N � o c (u U N Z O O m Q) m m m O O O O O O O O O O O O O Q J C m L V y o O m N M M (+7 M O N O N O N O N O N O C m E CDN J o Y H W m M r: O Cl) LD m r- N M m N m (D m r- n r- N m L[) N rl C) U m O M M o U a C O r- M � C m M V 7 N V V M V V m V V m V O r- V It f- v m r- V N m a m O m O N (A C y M M M M M M ` M M co M M M M N = O W N Ci � u ui c 10 L U` V C m V V N LD Ln Cl) N m V Ln m m n Q ` ` w U � m m N r` N M M m M N m N m n M ID N V O- N m m cm V m m W N N Y) m ID O Q c w C N N N N N (`') V V Ln LD m 0 > 0 7 m J F 2 fp O N U Y N V m V m m m m m m m V m m c m m m m a m m m a c '0 p 2 m u� m L Ln m Ln Ln Lri vi Ln Lri m u� O U N O - m u) OL (U G .V m 'O Q m lt) to N r- V m LD V' m V f` V R r- Cl) m N N - m N o Cl) m N (D m m m O � M r.- f` O N N N N N N N m N O M M O M M M u� M a �x m W ; 0 U m fn Cl) m D O M m r- M m V m O m n N o �D (mD y U m m M m m m O o N m m m O m ID M 17 r- r- M rU E CO M M 7 Ln Ln m m r- r- O) m U N y V V V V V V V V V m Q Z > F Ln m m h M to m M o o m m m m Lq U? M N _ O M M m Lo O m T N m � n o m � m m N m N m LD u� Ln t0 t0 r- r- r- (D (O —ao m m m m ao ao m m m m m m O N i Q r- m M Lf) r", m (l! m m m m M M M N o m v: V m m M r- N N� N M .�- � � � o m m N N O d m Lf) O O 'N ... Q m(D + d O N T T r e Z N g .N- 2 u) 7 t7 rn o m M O m M m � o Cl) ll� o m a o o M � o M m m m m a o o 0 0 U T o to01 o _ a a m a) cod O m U (n Q Q L L N N N r 3 o m AM AE N U1 y p O o Z a d o 0 0` o o O M O O O 3 O o o O O _ O T O N O li f1_ �\ pr Q O TLciV N O Q O Li LD Q N O U o Q V c) O y m 'O O O o O O M O O M O M O Q ELO O ` 1� N h N N N Ol M O V t` 7 N O H O LD O _11i1 p G W O O N O N p N O a 0 a O O O O O O O O W 01 V O r_ y m E ci a in 3 o in a N N O O O m �- M �.(� M m O •- O O (D mi � .; O co O O O m m O O m m N O O M t(] h O Q ri O O O M m N m m N O O m O O m m w m m a) m O O M N O (? O m ( D O m m D LL m o O 00 V M r V n m m .- t0 r m (D N N a0 m O m M (D f� v1 lt1 m (O (D M (O m co V a` z N O V O m (O m m M m O m M M M m N m (f1 m (D m m (O (O M h O L N m N O m m Q O 7 O I' j N U) IL O m m 0 N N 6 (0 > O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O Q J c r- N N N N N N N N N N N O N O N O N O N O N O N O N O N O N O N O N o m 3 0' N 7 c E N J G J ❑ O N y Y Ft W _ m m m O W O M O CC! m M (D (O m m (D M t0 N N V n N N V (D m V m m m N f` (O (D N N (O m (p .- V N V (D m CO Cl? N M ((] m (p V o m n M N m m a) m m m (O C Z S lD u"1 m f, f-- m m m O cl m (D fp m CO M l0 m L w N N m co C-i M co co m m Of A O ti n n ti C` n � c Ill W O A d r O N rd. !d m N V f� O (p V pN O mm (D N <t t0 u') (O N O o f� m 00 M O m N co (N O m (D O .- Omi N co O rd. N U N U N K A M m m � m m m M V m O tf] m f� m N 4) n M r f� f� N T L y L c m (D 1� m (D m m m m O m O m O m O ( m N m N m M m m O m m co r m m m (D m o Z m m m m m m J r2 f% O Z m m m m m m m m m m (O m l0 m u] m (O m N m u7 O O_ V m V M m m (O (O O f- N (Dp N m m O m m (O m Cl)M _ m (p 10 (� f- (p m r N O O (D V M (D O f� M f� M m N m m m O m N M p N m N O m m m m C jL 03 LU F` O U d m M r` o m M (n m M co (O N M O W f- m m m M f- N (V M (n r o O (n V m w Q (n v (D m (O m N W N m IT (O M m V cD N m m t0 Cl) m M f- f` r- m V' N O O m m IT N of V y N V m V m V O l0 O (O O t0 O (D O (O O LO o (O O m O (O O (O O (O O u] O l0 O t0 O (O O (O m V O( L Z � m M (D N m N N (O.- m l0 Lq r,� m m m o (N pmi Cl) V f� m m N O N O N O N O N O m m m m r N N y m m m m m m (D (o cD m co m m m m m m m m m m m m m m m m m m m m >O (n F` m M M m m u? O f- (O N M M m f- O V f� n m m f� f� M (D M (D M m m (O O ti m h m m m N m (O m O m (O m O m N M R m (p O O (p m O r O m m (D m a m C Y m CD NM U) O m V M M O O O N m m (D (O 'r M (O M m m m m N C m m W O m Q O) O dD O O O] m m O m f- m (O (D m M m O r O m m m m m m m m m (p m (n O V O O m a M � c E m o Q o � Q Q L 7 N N N L p N f14 � N O m Z fl d O O O N M (O O O O (P O O O O f- O O O O O O f- O O o o fl- 7 O O O O - o m O O 10 a 01 m O O O O O o O O M f� O O O O O o M M o O o O M m O o O O o O (") M O O m o O O ` a0 m O N M C V (O (p (D h m m m O f� O O N O O O CDc C4 N M N O cn �► Z c ♦ y d rn E c H varn��o a N N . N O O N O N C' O m m O n m W OR O o (O 0 O 0 O 0 W 0 O m M O M �.�z Cl) rn m m (n 0 0 0 O of m m m o m m w NO 0 m U 10 m 0 O O �z U) O J O nj d M t` m W N In m m m (N M W m Cl) f- m M (N m N W Q m U V v o � o (n n m o v) N zi Z r- r- m r- m W m m co o m o p N Q 4) -- c' m m O N O N N N N N N M N U H p cr > _ � � d O 3 Y N (0 o' Z O o O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 -� 3 Q N N N N N N N N N N N 04 MO rn m Q' W 7 T J _ N N 3 C Q O Y F� W m m (n m m rn (n co m M _v Lo v m o o m (; o o c-, m ui () o M m o m m Lo V O r- V O Lo IT CO V (o M CO N v N v m d O C N M Mvi m w w - 7 ui .m N (1] r7 N ui m m w' O o (� m '6 u y O r m m N m m (n Q y c V N m M n n V V M co M W m m m m m W 7 N N m m m O (��. y 01 U N :i N w T(A d W (� M W M m M m r- m V m m m o M m m m m L d L W ao W ao W m W m w r"m r1m o>O>OcA o m mm mmm m mm mm Z J F rq 0 Z � � � - LO - Lo Lo m � m v O C Cl) m N m W (n m Cl) m u') m OR to m M m rl M m W V V O O m f\ m O In m r r W amo T Cl O N N N a 9 N N N N N N m W 7 I U CL n N N V m O M V m W m O m (N pl O M 7 (9 W o V N O O m N W N W oo O O O O Om) mm W p' N N N N N N W R V [t V V Z V M r o r` m m m m m m t` f� m V m O O (() N V' V N N O o m m W Omi OWi O O N m W m eo W W (D W N m LO W co N m N co m m cn W W m >O F` O O N m O cq W W N W V M (A m m O �{ O W m m m m Moo Q d QQ] Y N N m m m O C m O O Q M O M O M O M O N m O m W W m Wm W m W m W O m a V c M E m o Q o L N N N O m Z a L o 0 o r1 �L eo o o ao m 0 o o o v o o v v lo a /+ > 41 oo r� O m O O ui N o O o O (n N o O ri V l O N M M v m lA m r-- r- c W p O N N N N N N N N N N N N O o) m a a m _ E c a o o a« m d y (o oo Ua'u)O d a y m . W a W N rn w a M v 'O p W D) � aD o u) DO c1l LO M w Im D io N N N m � O O �z 7 C O m O (D io u) u) O O J v 04 m U Z O p) a Z Z Z Z Z Z Z Z U (Lp ❑ u� O O n (() (O N � O m d' (� rn m n n a' W Oi ai up a1 to a coa 'a m m m m m Cl) m m C 3 Y r a) Z Q J O n o n O n O n O n O n O n p J n m L O n mC D1a) mw a j C QY o O O (DO O O O O O O o O o O CD O O oO O O O O O O O OOOO OO >�>No Y W N ov O O It CN v (D N w N 0 o O n v n (nD M mwm m y O) W N m V c ER v ui u) W T n (n0 o m LO W) ui M Cl) N w n ER n n � n m r� ui n m � 3 m W U G o N L w d N C O O O o o O C. O O O O O O O O O O O O o CO O O o O o O O O o a0-i @ U m C O m m w W O O O O O 0 0 0 O O O N ui N O O U o C 7 a (('� m Q) Cl) m N m N m D1 -7 O u) O O O N m N v O m N n v v_ v_ ui v m d m rn m- Cl o G rn m n v (o � �- a°)o 4 wv v v v rn a v c v v v v a v v v v w rn rn rn uI u) u) ui ui W m W 01 W rn rn W w m u ui ui u) u) ui ui � u Oa 2 z >> J F z U1 ❑ O O_ m o o O o o Lo N v (O+) O O O O O (Ln (n u) m o u) u] u) (D u) u)Lo W O n u) O O n a. C v u) N (D n N N u) n0 v0) a a o m W m N N N N M O v m LL O O u) w m m m o N_ m O W N n w O 11J m O u.l Cl) O m u) n m O O w o o N O) m m y n '� O o amD o O W V W o co (.0) Iq - um) o o (7 (O p o o w O c (D V Cl) N (7 N O N O N co ui u) Cl) coOr- O u) m '. Z u') N u] N u) ap u) N o a N ui n a Z m n m N Z rn G Z o Z Z Z z Z m 00 Cl) m (p O m v n o m m Z m v o n co to co cn O (OD 0 o o 0 O o O o o o o o o (°no o o o o o O W o v O Goo O v o v o o o o o o o 0 09 0 0 0 o Ci o- u) Ln o N D (o N N N N (o (o (o (o ui 0 o ui u) o o p m o C. o> N❑ (o H N N N N N N W (D (o W W (o Di p W �j co i> r °o °° co rn (p > 1'm aloo, m O o o M Ln H o v O m V co O O ( L m m n u) o m a00 ❑ g ❑ ❑ O O � W fD w tD co v- O j (D op L N 41 . w r 7 p ui m u) n CO n N q (D m n m p M o n N rn O (o co u) O .- m M m � N i0 is N N o O o N O (� y p y f O j O o (n 41 Ci O N O O O O Ln O N p (n g N (o n u) Q N n O) a C ... Q r) o u�n (n V rCD - Cl)m N ao LO (p (J T (o d a d d m o m m a m d o U U U U c a) (n n n n L O m A M A o OI O) O) 12 o) Z a a o 0 o m m m m m `m `m (� � N � N N m V m N N N C N � N m� uI O a) (D O 'E "o "o 'E N o y C C C C C C C N E w N E o 0 o a a a a E E -I E "'ma o'0 'o o o o o 0 a Z E m N c F m 0 m a a m o c H m 0 Cl) e F m o ap c a m 'o (n C c H m 'o o °T) a m o a a a a a a v c m (.j o c a a) m i' L art 41 aaa n a 2a n a oa n n as < as ^ Ha n as a o E- y E� r_ N p m a y N N Cl) N Cl) N N N Cl) N N N (a /��\ U a in ❑ H F o 0 o o o a 0 0 cli m a U d Z Q a � O d a 0 3 Y N A J C (0 d 3 3 E o _ C m T d d d Y N C O H W ui O C d d d � O L � � c d p Gi cd7 C C � C=1 d v 4 U ` d w N r J 2 2 y G O Q N m a m O U CL m CL Q0] Y g Q 0 T m O C N m d M O > Q o L N N N Z D a o 0 o ^ l.L c_ a C O a Ep� 'AtN0 i�33 o U m -o 5 m 0 0 LO m 0 2E zi O U o o o y (n n o N N O O EC G (n n o L N f- O m m O m N r .N E i m U T d T > d d J � 7 u) U) u O o M m m m O co c U U U O rn d v m d Q Q Q � E f� � U 0) M °J E N N N CL -a -a(0 ( O M M A O G C V m m O) 0 a U o 0 o Y W m W m rn F d cc Z M N N I� m m m m O M r O m O V N O W m O Mm m N V O (0 O O m O 3 N N N N N N N M M M f� a) (] f- cp O N M N N N N d I 16 C_ u) 6 O O H U M jp m M M O 0 I- M W V (n h M m O (0 (O (n m M (0 M N M m M h V (O O O N r, O m C U Co O M M N f� M V'T (O V (D N M m W O N M m (D C N m -! N �'. M 0)m M co o V O V N V m (n O M 10 I� m m m O O c O O O c N O O c M O) m m W d N V V V V V v 7 V V 7 (n N N ui N N m N V A + a) n cq V m Y m m R N O Ll N m M m - O m V V O V o m (0 T w m m m m m m o W (fl o M M m O] (0 a) O I� m O N V 0 ,�„ A L N O V O T m O l0 N N V M N m m U M . N (f1 m m (0 (N W (f m l0 m M f� N O m N m m V N m O O I- r- m M m (0 O m W m m N O m i .�., c0 00 m m m m W m qo co (O co m m m co 4o m co m o M O d L M M O O 7 7 o o O O O o (A l0 N N 7 p_ N N m N 'p O O O O O O � M m m m m m m M d u) O N O Y N f� O m O O O m M M N (A m M M "i (7 m c0 aD 6 6 C6 d Q_ N N N N M f� M m M f- � m N N V o O O O O O O o � N 0 0 R 0 o O c c (o c o IL a W W W a= N m o 0 (V � � a� a U z Q n O a) a � � 3 Y N OI C J N O Q N 3 M ) m O rC O Y F LW ei U 'O C O W L d � d � C � O i6 N a: c u (i c 0 o c u m y c � 6 ) N V v w r u Z >0> J F m 2 m 0 O Q Q) m d C m 0 U n. CO CL Qm Y g Q U T 0 C @ O N M , E N O Q O N N N O in A M Z CL O O O (y ` a N o/N4 E P3 w ci 1` ( r) t40 O O M O O N I a F yT T T VJ t%J w 12 Q Q Q O �mmm��m�mmmm�mmm`am�"`oam d3 �m r >--N-------m' �t2 tmNoo �om;�oo��oo�o��000000 oz oomo'-moo--c00000^00000�oo y m No w H w �cq cq IR cq "v� wi ^om^'n ,saioo�� r v m c%j csi o m m��� m m m m m m o o m o v m om m o^ m �m .c-^mo��mrioao-imm-icii'omm L o o m r d � o J m oo m o0 00 m m oo C O. l0 (U?/k}Sn OL) q;d3G jEotuan crud, U 8� ƒ» ( Gm m)(+)qiioN/(-)mmS ! \ / i a m g 0 a Z c0 ti E E¢%—m L E� y .2U z ��FWa: J L N r L FT w (b U)2 O C C OI z �w �W'E z a O U U cy N 0 r � o �o CM, cn N U C z l0 F y r N cy p in M ui Cr �O cn O y m O UI y oEmc� -� C. y O d U F MEw om-,it z -X ¢ o�E � a cOd� ti N M O O N N ` M M a a o 0 3 u:_3=y0Q N d N 0 IL o c a 12800 12700 oa>>>a Z o ^ ° a 6 12600 w o<A C? 9 m 8 12500 $ o 9 o m ¢ + 12400 12300 12200 12100 12000 C d 11900 O 11800 11700 7 11600 00 _ t 11500 U 11400 3 O_ N ca °1 11300 C C D __ 11200 C 11100 11000 CD 10900 35 10800 -2 G? 10700 O d 10600 10500 r- N 10400 c� O 10300 10200 0 6 6 COY Cam') 6 M 6 6 tO'1 N 6 6 0 0 0 0 0 N N N N (ui/usn OZ) uoilejedag ai;uao of ailuao o 0 0 0 0 o 0 i ���Q�m�PPW�nPemr�r NNv�Wm . � mPYI�N t+lN mmmrNCl t�l m N NC1 t�l C)Pr W �'�'m N NN ,IN N 0 0 0 0 0 0 0 0 0 0 0 0 0 p 00 V O N n m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 'p LLO �p tGOG OOOOOOOCOG O owll WOO m m .......... 0 0 0 0 0 0 0 N W m 0 0 0 0 0 0 0 0 0 0 0 0 0 U O1$ d] uj N� qe LQ c4 q (p . INN O. Wit. yd ^ � nmOt7�m�Nwmm<H 9� � N NNNAn OOPOOm wPmn W .-00 F(7� a NN t�l Ol �+1PAw �^^^m NN N NmYl t`9mt7�mthmmmt7N�mA O NOQ O r w P n O m m m W sn m P m O n m ZmTT00 NNO�uPI<N�p a H' g O n 9 m. mPO�Pn W �o �'o` jeDm�m W ul t7�C]� W hwOAm ONP �il � a �-�uiovc�c�aimcviP N n�nm W�mn�"m nm on�mc�o rnmw �' g L cR mmmm`�$ `a8mmmmmmm`�mmomo m �>a w- W m m N n w-- m � O OO Q o Nwm��v��n a7�m o m $ do n�^�o m�mui om o.-ny wU c�� rw 'orw^o ram. ova E E¢3,Vm ^w ¢ =u�U3 �n L E � >" NR "MainnN OOv'i 0o on wN W No SOOOi O too C �"� f0 d vi c O � v Em v e a J L.e L N L p0000O0�(f vI^�^��nmmm0v $ 000 WO6 ¢ 'MO o m N � N �� ONOOt70�+1 t+1 t7 t7mmm QHh rl F rNeGi mO r�hwClN At'Im[In Aw NN P �� �� � NNNNCI PNmr.-PtpwN Nt'1 ��9n m c wo •-���� ��- z�wrnLLj E o d sp o-N-Prom--Wo 7 CO) — Nmnm w----.---- N OU U O O C. O m 1l- LO O O -q O c) N N U M r• N o u) O 0 0 I o V O O O O u) N�8 C Z N F y A FF N O w C O O Z UpO�o U 2 -Ud T o to oEmCM e o yLL y M U 2 O,E Iq Z o1J12 � MM ¢ e. IDo� O �. O o O o 0 c) o O o o o rn_ co r• co u� v ti N CT6 A T N p A O co N N C'7 0) a- Cl) c IL 07 _ y ¢ ' M a)" a 'rn y — M i Cl) C Q- l6 a � hi U y o C M M U � O C7'1 d O CU p O N Li M O d NE Q O a - - - e 8 N Z o 0 0 0 0 c� P } # # } CD V CD r C o O (0 0- (1) O � c N CD 0 o Mo O Cl CD 0 0 0 0 o O N N OCh LLD) CD f- Co M ti N N O co r C O 7 N � ti co U ap a O � s O o Z N C 2 C�C C Q Etz _ U w am 8 0 0 0 U v�� V Ito Uaop m _ -QQ yq rnN O m rn U j Z[^ `M C CN > j m s O o } d U CO CD Obp North America - ALASKA - BP Prudhoe Bay PB DS 03 03-27 03-27A 03-27A WP05 Travelling Cylinder Report 06 December, 2016 F p P �_- BAKER NUGNES �,...,, BP WE Fag Travelling Cylinder Report BAKER 0% HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 03 Site Error: 0.00 usft Reference Well: 03-27 Well Error: 0.00 usft Reference Wellbore 03-27A Reference Design: 03-27A WP05 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 03-27 Mean Sea Level Kelly Bushing / Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD - ANCP1 Offset Datum Reference 03-27A WP05 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 10,175.00 to 12,843.31usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,481.17 usft Error Surface: Elliptical Conic Survey Tool Program Date 12/6/2016 From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 10,175.00 Survey #2 (03-27) GYD-CT-CMS Gyrodata cont.casing m/s 10,175.00 12,843.31 03-27A WP05 (03-27A) MWD MWD - Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2,404.00 2,341.47 13 3/8" 13.375 17.500 10,203.00 8,558.89 9 5/8" 9.625 12.250 10,240.00 8,594.67 7" Planned TOWS 7.000 7.000 12.843.31 8,606.49 2 7/8" 2.875 4.250 Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) PB DS 03 03-01 - 03-01 A - 03-01 A 10,185.27 11,125.00 911.87 180.80 736.72 Pass - Major Risk 03-27 - 03-27 - 03-27 10,175.00 10,175.00 0.00 0.07 0.00 Pass - NOERRORS 03-28 - 03-28 - 03-28 Out of range PB DS 09 09-04 - 09-04 - 09-04 11,814.77 9,625.00 734.90 353.31 384.83 Pass - Major Risk 09-04 - 09-04A - 09-04A 11,900.00 9,575.00 731.14 321.78 409.87 Pass - Major Risk 09-16 - 09-16 - 09-16 10,975.00 10,750.00 1,264.71 499.80 857.11 Pass - Major Risk 09-31 - 09-31 D - 09-31 D 11,158.05 14, 925.00 236.15 165.93 130.93 Pass - Major Risk Offset Design PB DS 03 - 03-01 - 03-01 A - 03-01 A Offset Site Error: 0.00 usft Survey Program: 100-GYD-CT-CMS, 9318-MWD Rule Assigned: Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Tootface + Offset Wellbore Centre Casing - Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) m usft (usft) (usft) (usft) 10,185.27 8,541.76 11,125.00 8,687.52 30,24 21.67 -110.10 4,094.60 -586.11 6.937 91187 180.80 736.72 Pass- Major Risk, CC, ES, SF 10,203.88 8,559.74 11,150,00 8,702,02 30.24 21.71 -109.20 4,10765 -601.73 6.937 924,63 181.24 748.75 Pass - Major Risk 10,224,46 8,57963 11,175.00 8,718,08 30.24 21.75 -108.45 4,119,22 -616.99 6.937 937.89 181,69 761.35 Pass - Major Risk 10,241.99 8,596.59 11,200.00 8,736.04 30.24 21.79 -107.85 4,129.13 -631.25 5,625 951.09 181.92 774,20 Pass - Major Risk 10,254.44 8,608.60 11,225,00 8,755.85 30.24 21.82 -107.44 4,137.47 -644.00 3.562 963.76 181.99 786,81 Pass - Major Risk 10,263.72 8,617.49 11,250.00 8,777A7 30.24 21.84 -107,22 4,144.33 -655,07 3.562 975.73 182,12 798.74 Pass - Major Risk 10,270,00 8,623,43 11,275.00 8,799.64 30,24 21.86 -107.17 4,149,78 -664.57 3,562 987,12 182,14 810.26 Pass - Major Risk 10,280,00 8,632.72 11,300.00 8,822.99 30,24 21.87 -107,32 4,153,98 -672.40 3.562 997.78 181.95 821,09 Pass - Major Risk U ; - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 12/6/2016 2:32:09PM Page 2 COMPASS 5000.1 Build 61B %4000 BP Z t" Travelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 03 Site Error: 0.00 usft Reference Well: 03-27 Well Error: 0.00 usft Reference Wellbore 03-27A Reference Design: 03-27A WP05 Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 03-27 Mean Sea Level Kelly Bushing / Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 03 - 03-01 - 03-01 A - 03-01 A Offset Site Error: 0.00 usft Survey Program: 100-GYD-CT-CMS, 9318-MWD Rule Assigned: Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toofface + Offset Wellbore Centre Casing - Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (I (usft) (usft) (in) (usft) (usft) (usft) 10,283.73 8,636,12 11,325,00 8,847,20 30.24 21,87 -107.60 4,156.68 -677.97 3.562 1,007,21 181.90 830.94 Pass - Major Risk 10,290.00 8,641.76 11,350,00 8.871,75 30.24 21,88 -108,04 4,157.86 -682.53 3.562 1,016.54 181.70 840.74 Pass - Major Risk 10,296.08 8,647.14 11,375.00 8,896,32 30.24 21.88 -108,60 4,157.25 -68L08 3,562 1,026.73 181.65 851.47 Pass - Major Risk 10,300,00 8,650.54 11400,00 8,920.84 30,24 21.88 -109.26 4,154,72 -691,18 3.562 1,037,37 181.58 862.79 Pass - Major Risk 10,305.68 8,655.38 11,425.00 8,945,38 30.24 21,88 -110.00 4,150.69 -693.68 3.562 1.047.32 181_37 873.47 Pass - Major Risk 10,310.00 8,659.00 11,450.00 8,969,97 30.24 21.88 -110.82 4,146.23 -693.81 3.562 1.055,65 181.18 882,63 Pass - Major Risk 10,313.89 8,66221 11,475.00 8,994.54 30,24 21.89 -111.67 4,141.98 -692,12 3,562 1,062.71 180,92 890.60 Pass - Major Risk 10,320.00 8,667,13 11,494.00 9,013.22 30.24 21.90 -112.32 4,138.77 -690.73 3,562 1,068.32 180,59 896.24 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 12/6/2016 2:32.09PM Page 3 COMPASS 5000.1 Build 81B BP ?►• ?, p 00 Travelling Cylinder Report Company: North America - ALASKA- BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 03 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 03-27 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 03-27A Database: Reference Design: 03-27A WP05 Offset TVD Reference: ri.2 BAKER HUGHES Well 03-27 Mean Sea Level Kelly Bushing / Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Onset Datum Offset Design PB DS 03 - 03-27 - 03-27 - 03-27 Offset Site Error: 0.00 usft Survey Program: 100-GYD-CT-CMS, 10400-BOSS-GYRO Rule Assigned: NOERRORS Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset 7oolface+ Offset Wellbore Centre Casing - Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 10,175.00 8,531.85 10,175.00 8,531.85 0.00 0.00 17.36 4,386.83 263.58 0.000 0.00 0.07 0.00 Pass - NOERRORS, CC, ES, SI 10,200.00 8,555.99 10,200.00 8,555.99 0.00 0.05 17.75 4,393.05 265.55 0.000 0.00 0.16 0.00 Pass-NOERRORS 10,225.00 8,580.16 10,225.00 8,580.16 0.00 0.11 17.29 4,399.13 267.47 0.000 0.00 0.22 0.00 Pass - NOERRORS 10,250.00 8,604.32 10,250.00 8,604.34 0,00 0.16 -170.48 4,405.21 269.33 0.000 0.07 0.09 0.07 Pass - NOERRORS 10,274.88 8,627.99 10,275.00 8,628.50 0,00 0.21 -173.59 4,411.35 271.20 0.000 1.39 1.25 1.39 Pass-NOERRORS 10,298.89 8,649+58 10,300.00 8,652.65 0.01 0.27 -174.14 4,417.52 273.06 0.000 6.17 2.95 6.17 Pass - NOERRORS 10,321.14 8,668.04 10,325.00 8,676.81 0.02 0.29 -173.35 4,423.71 274.84 0.000 14.36 4.46 14.36 Pass - NOERRORS 10,341.11 8,683.03 10,350.00 8,700.97 0.04 0.32 -172.36 4,429.91 276.50 0.0D0 25.52 5.77 25.52 Pass-NOERRORS 10,358.62 8,694.77 10,375.00 8,725.14 0.05 0.35 -171.60 4,436.11 278.04 0.000 39.17 6.85 39.17 Pass-NOERRORS 10,373.76 8,703.76 10,400.00 8,749.32 0.06 0.37 -171.02 4,442.32 279.46 0.000 54.85 7,73 54.85 Pass-NOERRORS 10,386.79 8,710.57 10,425.00 8,773.49 0.06 0.38 -170.61 4,448.57 280.82 0.000 72.13 8.43 72.13 Pass-NOERRORS 10,398.00 8,715.70 10,450.00 8,797.65 0.07 0.38 -170.33 4,454.85 282.18 0.000 90.66 8.99 90.66 Pass-NOERRORS 10,407+68 8,719.58 10,475.00 8,821.79 0,07 0.38 -170.14 4,461.18 283.55 0.000 110.20 9.45 110.20 Pass - NOERRORS 10,416.06 8,722.51 10,500.00 8,845.93 0.08 0.38 -169.99 4,467.55 284.93 0.000 130.54 9.81 130.54 Pass-NOERRORS 10,423.34 8,724.72 10,525.00 8,870.06 0.08 0.38 -169.88 4,473.94 286.29 0.000 151.55 10.11 151.55 Pass-NOERRORS 10,430.00 8,726.47 10,550.00 8,894.20 0.09 0.39 -169.77 4,480.32 287.60 0.0D0 173.11 10,37 173.11 Pass - NOERRORS 10,435.28 8,727.68 10,575.00 8,918.34 0.09 0.39 -169.67 4,486.69 288.87 0.000 195.12 10,56 195.12 Pass-NOERRORS 10,440.00 8,728.61 10,600.00 8,942.48 0.09 0.39 -169.58 4,493.06 290.09 0.000 217.51 10.72 217.51 Pass-NOERRORS 10,444.58 8,729.39 10,625.00 8,966.63 0.10 0.40 -169.50 4,499.44 291.30 0,000 240.21 10.87 240.21 Pass - NOERRORS 10,450.00 8,730+15 10,650.00 8,990.76 0.10 0.40 -169.44 4,505.85 292.50 0.000 263.15 11.04 263.15 Pass-NOERRORS 10,450.00 8,730.15 10,675.00 9,014.88 0.10 0.41 -169.38 4,512.31 293.72 0.000 286.30 11.04 286.30 Pass-NOERRORS 10,455.23 8,730.72 10,700.00 9,038.99 0.11 0.41 -169.33 4,518.80 294.93 0.000 309.59 11.19 309.59 Pass - NOERRORS 10,460.00 8,731+08 10,725.00 9,063.10 0.11 0.42 -169.29 4,525.31 296.15 0.000 333.08 11.31 333.08 Pass-NOERRORS 10,460.00 8,731.08 10,750.00 9,087.20 0.11 0.43 -169,25 4,531.83 297,37 0.000 356.68 11.31 356.68 Pass - NOERRORS 10,460.00 8,731.08 10,776.00 9,111.31 0.11 0.44 -169.22 4,538.34 298.59 0.000 380.46 11.31 380.46 Pass-NOERRORS 10,465.40 8,731.33 10,800.00 9,135+41 0.12 0.44 -169.19 4,544.85 299.81 0.000 404.27 11.44 404.27 Pass-NOERRORS 10,470.00 8,731.41 10,a25.00 9,159.52 0.12 0.45 -169.16 4,551.37 301.03 0.000 428.24 11.54 428.24 Pass-NOERRORS CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 121612016 2.-32.'09PM Page 4 COMPASS 5000.1 Build 81B .04"il BP rr..® �00� by Travelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 03 Site Error: 0.00 usft Reference Well: 03-27 Well Error: 0.00 usft Reference Wellbore 03-27A Reference Design: 03-27A WP05 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 03-27 Mean Sea Level Kelly Bushing 1 Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Offset Design PB DS 09 - 09-04 - 09-04 09-04 - Offset Site Error: 0.00 usft Survey Program: 149-CB-MAG-MS Rule Assigned: Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toofface + Offset Wellbore Centre Casing - Centre to No Go Allowable Wammg Depth Depth Depth Depth Azimuth +NIS +FJ-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) PI (usft) (usft) (in) (usft) (usft) (usft) 11,693.34 8,702.55 10,250.00 9,099.16 32.20 99.26 -31.86 5,966.39 1,081.41 6.937 984.04 362.54 647.93 Pass - Major Risk 11,700.00 8,702.56 10.175.00 9,039.26 32.22 98.62 -28.33 5,945.93 1,121.64 10.937 937.73 363.96 599.72 Pass - Major Risk 11,700.00 8,702.56 10,200.00 9,059.23 32.22 98.83 -29.27 5,952.75 1,108.23 10.937 952.79 363.16 616.73 Pass - Major Risk 11,700.00 8,702.56 10,225.00 9,079.19 32.22 99.05 -30.18 5,959.57 1,094.82 8.312 968.25 362.14 632.43 Pass - Major Risk 11,710.78 8,702.58 10,150.00 9,019.27 32.23 98.23 -26.07 5,939.04 1,134.99 10.937 922.88 364.91 583.23 Pass - Major Risk 11,715.20 8,702.59 10,125.00 8,999.23 32.24 97.81 -24.53 5,932.05 1,148.20 10.937 908.36 364.54 566.96 Pass - Major Risk 11,725.00 8,702.60 10,050.00 8,938.90 32.26 96.58 -20.10 5,911.15 1,187.55 10.937 867.35 362.78 520.89 Pass - Major Risk 11,725.00 8,702.60 10,075.00 8,959.03 32.26 96.99 -21.22 5,918.10 1,174.46 10.937 880.57 363.88 535.82 Pass - Major Risk 11,725.00 8,702.60 10,100.00 8,979.15 32.26 97.40 -22.31 5,925.07 1,161.34 10.937 894.29 364.97 551.34 Pass - Major Risk 11,733.29 8,702.62 10,025.00 8,918.76 32.28 96.17 -17.95 5,904.21 1,200.63 10,937 854.56 362.89 506.68 Pass - Major Risk 11,737.94 8,702.62 10.000.00 8,898.60 32.28 95.75 -16.19 5,897.29 1,213.69 10.937 842.29 362.44 492.99 Pass - Major Risk 11,742.65 8,702.63 9,975.00 8,878.43 32.29 95.34 -14.39 5,890.44 1,226.79 10.937 830.59 361.97 479.96 Pass - Major Risk 11,750.00 8,702.64 9,925.00 8,838.11 32.30 94.52 -10.93 5,876.92 1,253.08 10.937 808.94 360.69 456.01 Pass - Major Risk 11,750.00 8,702.64 9,950.00 8,858.27 32.30 94.93 -12.24 5,883.65 1,239.92 10A37 819.47 361.81 467.68 Pass - Major Risk 11,757.19 8,702.65 9,900.00 8,817.95 32.31 94.11 -8.72 5,870.29 1,266.29 10.937 799.08 360.44 445.27 Pass- Major Risk 11,762.18 8,702.66 9,875.00 8,797.78 32.32 93.70 -6.74 5,863.80 1,279.55 10.937 789.94 359.90 435.38 Pass - Major Risk 11,767.24 8,702.67 9,850.00 8,777.60 32.33 93.29 -4.72 5,857.43 1,292.87 10.937 781.54 359.33 426.40 Pass - Major Risk 11,775.00 8,702.68 9,800.00 8,737.24 32.34 92.47 -0.87 5,844.82 1,319.56 10.937 766.76 357.87 411.08 Pass - Major Risk 11,775.00 8,702.68 9,825.00 8,757.42 32.34 92.88 -2.35 5,851.17 1,306.23 10.937 773.88 359.03 418.38 Pass - Major Risk 11,782.72 8,702.69 9,775.00 8,717.07 32.35 92.06 1.55 5,838.33 1,332.82 10.937 760.17 357.51 404.54 Pass - Major Risk 11,787.95 8,702.70 9,750.00 8,696.90 32.35 91.65 3.70 5,831.71 1,346.04 10.937 754.12 356.86 398.80 Pass - Major Risk 11,793.21 8,702.71 9,725.00 8,676.74 32.36 91.23 5.88 5,825.04 1,359.22 10.937 748.71 356.19 393.92 Pass - Major Risk 11,800.00 8,702.72 9,675.00 8,636.37 32.37 90.41 9.85 5.811.89 1,385.63 10.937 740.25 354.46 387.34 Pass - Major Risk 11,800.00 8,702.72 9,700.00 8,656.56 32.37 90.82 8.27 5,818.43 1,372.42 10.937 744.08 355.63 390.06 Pass - Major Risk 11,809.32 8,702.73 9,650.00 8,616.17 32.38 90.01 12.57 5,805.42 1,398.86 10.937 737.18 354.06 385.53 Pass - Major Risk 11,814.77 8,702.74 9,625.00 8,595.94 32.38 89.60 14.84 5,798.99 1,412.07 10.937 734.90 353.31 384.83 Pass - Major Risk, ES, SF 11,825.00 8,702.75 9,550.00 8,535.00 32.39 88.38 20.95 5,779.84 1,451.37 10.937 732.76 350.51 389.17 Pass - Major Risk 11,825.00 8,702.75 9,575.00 8,555.35 32.39 88.79 19.32 5,786.21 1,438.32 10.937 732.67 351.69 386.57 Pass- Major Risk, CC 11,825.00 8,702.75 9.600.00 8,575.66 32.39 89.19 17.69 5,792.59 1,425.22 10.937 733.44 352.88 385.12 Pass - Major Risk 11,836.81 8,702.77 9,525.00 8,514.63 32.40 87.98 23.99 5,773.43 1,464.37 10.937 733.43 350Al 392.30 Pass - Major Risk 11,842.38 8,702.78 9,500.00 8,494.25 32.40 87.58 26.28 5,766.98 1,477.32 10.937 734.86 349.26 396.60 Pass - Major Risk 11,850.00 8,702.79 9,450.00 8,453.42 32.41 86.79 30.41 5,753.95 1,503.09 10.937 739.85 347.31 408.13 Pass - Major Risk 11,850.00 8,702.79 9,475.00 8,473.84 32.41 87.18 28.81 5,760.47 1,490.22 10.937 736.99 348.49 401.77 Pass - Major Risk 11,859.23 8,702.80 9,425.00 8,432.98 32.41 86.39 33.10 5,747.50 1,515.96 10.937 743.46 346.59 415.14 Pass - Major Risk 11,864.92 8,702.81 9,400.00 8,412.53 32.41 85.99 35.34 5,741.11 1,528.84 10.937 747.88 345.65 423.26 Pass - Major Risk 11,875.00 8,702.82 9,350.00 8,371.59 32.42 85.20 39.59 5,728.55 1,554.64 10.937 759.01 343.66 442.32 Pass - Major Risk 11,875.00 8,702.82 9,375.00 8,392.06 32.42 85.60 38.08 5,734.80 1,541.73 10.937 753.10 344.85 432.16 Pass - Major Risk 11,882.17 8,702.83 9,325.00 8,351.12 32.42 84.80 41.92 5,722.35 1,567.60 10.937 765.66 342.70 463.03 Pass - Major Risk 11,888.00 8,702.84 9,300.00 8,330.67 32.42 84.40 44.05 5,716.21 1,580.60 10.937 773.01 341.67 464.59 Pass - Major Risk 11,900.00 8,702.86 9,250.00 8,289.79 32.42 83.61 48.25 5,704.05 1,606.69 10.937 789.67 339.53 489.90 Pass - Major Risk 11,900.00 8,702.86 9,275.00 8,310.24 32.42 84.01 46.89 5,710.12 1,593.65 10.937 781.09 340.74 476.67 Pass - Major Risk 12,314.94 8,625.21 9,225.00 8,269.33 33.10 83.21 19.03 5,697.99 1,619.72 10,937 791.20 351.11 480.30 Pass - Major Risk 12,325.00 8,622.84 9,175.00 8,228.38 33.15 82.42 23.27 5,685.91 1,645.74 10.937 794.30 350.64 490.20 Pass - Major Risk 12,325.00 8,622.84 9,200.00 8,248.86 33.15 82.81 21.92 5,691.93 1,632.73 10.937 792.42 351.69 484.91 Pass- Major Risk 12,335.24 8,620.43 9,150.00 8,207.90 33.19 82.02 26.15 5,680.00 1,658.81 10.937 796.89 351.12 496.43 Pass - Major Risk 12,342.21 8,618.80 9,126.00 8,187.42 33.23 81.62 28.51 5,674.22 1,671.93 10A37 800.21 351.03 503.48 Pass - Major Risk 12,350.00 8,616.97 9,100.00 8,166.95 33.26 81.22 30.96 5,668.56 1,685.10 10.937 804.24 351.00 511.32 Pass - Major Risk 12,356.46 8,615.47 9,075.00 8,146.47 33.29 80.83 33.19 5,663.00 1,698.32 10.937 808.94 350.72 519.92 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 121612016 2:32.-09PM Page 5 COMPASS 5000.1 Build 81B 4e••0, BP • Travelling Cylinder Report Company: North America - ALASKA- BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 03 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 03-27 Survey Calculation Method: Well Error. 0.00 usft Output errors are at Reference Wellbore 03-27A Database: Reference Design: 03-27A WP05 Offset TVD Reference: rG.9 BAKER HUGHES Well 03-27 Mean Sea Level Kelly Bushing / Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 09 - 09-04 - 09-04 - 09-04 offset site Error: 0.00 use Survey Program: 149-CB-MAG-MS Rule Assigned: Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference offset Toofface+ Onset Wellbore Centre Casing - Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +FJ-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (') (usft) (usft) (in) (usft) (usft) (usft) 12,363.71 8,613.78 9,050.00 8,126.99 33.33 80.43 35.50 5,657.50 1,711.56 10.937 814.27 350.49 529.21 Pass - Major Risk 12,375.00 8.611.15 9,000.00 8,085.03 33.38 79.63 39.55 5,646.68 1,738.12 10.937 826.78 349.50 549.88 Pass - Major Risk 12,375.00 8,611.15 9,025.00 8,105.51 33.38 80.03 38.40 5,652.06 1,724.83 10.937 820.24 350.63 539.11 Pass - Major Risk 12,385.93 8,608.63 8,975.00 8,064.56 33.43 79.23 42.32 5,641.37 1,751.45 10.937 833.88 349.47 560.97 Pass- Major Risk 12,398.81 8,605.67 8,950.00 8,044.10 33.49 78.83 45.36 5,636.11 1,764.83 10.937 841.59 349.47 572.56 Pass - Major Risk 12,400.00 8,605.40 8,925.00 8,023.66 33.49 78.43 46.49 5,630.91 1,778.24 10.937 849.76 348.40 585.04 Pass - Major Risk 12,407.32 8,603.78 8,900.00 8,003.22 33.52 78.03 48.06 5,625.75 1,791.68 10.937 858.50 347.73 597.85 Pass - Major Risk 12,413.71 8,602.45 8,875.00 7,982.79 33.55 77.63 49.54 5,620.59 1,805.14 10.937 867.73 346.99 611.21 Pass - Major Risk 12,425.00 8,600.28 8.800.00 7,921.54 33.60 76.42 53.25 5,605.14 1,845.57 10.937 898.37 344.19 654.53 Pass - Major Risk 12,425.00 8,600.28 8,825.00 7,941.95 33.60 76.83 52.31 5,610.27 1,832.07 10.937 887.64 345.36 639.41 Pass - Major Risk 12,425.00 8,600.28 8,860.00 7,962.37 33.60 77.23 51.34 5,615.43 1,818.60 10.937 877.49 346.53 624.87 Pass - Major Risk 12,438.15 8,598.03 8,775.00 7,901.16 33.66 76.02 55A0 5,600.05 1,859.13 10,937 909A0 343.80 669.29 Pass - Major Risk 12,450.00 8,596.28 8,700.00 7,840.13 33.72 74.81 58.53 5,585.08 1,900.07 10.937 945.41 340.92 717.48 Pass - Major Risk 12,450.00 8,596.28 8,725.00 7,860.46 33.72 75.21 57.68 5,590.05 1,886.39 10.937 932.96 342.11 700.82 Pass - Major Risk 12,450.00 8,596.28 8,750.00 7,880.80 33.72 75.62 56.81 5,595.02 1,872.73 10.937 921.02 343.30 684.64 Pass - Major Risk 12,460.90 8,594.89 8,675.00 7,819.80 33.77 74.40 60.09 5,580.11 1,913.74 10.937 958.17 340.32 733.84 Pass - Major Risk 12,466.32 8,594.28 8,650.00 7,799.46 33.79 73.99 61.26 5,575.15 1,927.41 10A37 971.35 339.41 750.85 Pass - Major Risk 12,475.00 8,593.41 8,575.00 7,738.45 33.83 72.78 64.12 5,560.25 1,968.40 10.937 1,013.17 336.26 804.07 Pass - Major Risk 12,475.00 8,593.41 8,600.00 7,758.79 33.83 73.18 63.38 5,565.22 1,954.74 10.937 998.83 337.45 785.86 Pass - Major Risk 12,475.00 8,593.41 8,625.00 7,779.13 33.83 73.59 62.61 5,570.18 1,941.08 10.937 984.92 338.65 768.01 Pass - Major Risk 12,486.90 8,592.44 8,550.00 7,718.10 33.89 72.37 65.61 5,555.30 1,982.05 10.937 1,027.71 335.64 821.82 Pass - Major Risk 12,491.78 8,592.12 8,525.00 7,697.73 33.91 71.97 66,62 5,550.38 1,995.68 10.937 1,042.67 334.68 840.26 Pass - Major Risk 12,500.00 8,591.67 8,450.00 7,636.41 33.95 70.76 69.10 5,536.10 2,036.45 10.937 1,089.84 331.47 897.58 Pass - Major Risk 12,500.00 8,591.67 8,475.00 7,656.88 33.95 71.16 68.47 6,540.78 2,022.88 10.937 1,073.73 332.67 878.06 Pass - Major Risk 12,500.00 8,591.67 8,5D0.00 7,677.32 33.95 71.57 67,81 5,545.54 2,009.29 10.937 1,058.04 333.86 858.84 Pass - Major Risk 12,510.26 8,591.29 8,425.00 7,615.94 34.00 70.36 70.34 5,531.50 2.050.03 10.937 1,106.16 330.73 916.75 Pass - Major Risk 12,514.64 8,591.19 8,400.00 7,595.46 34.02 69.97 71.20 5,526.95 2,063.63 10.937 1,122.82 329.73 936.43 Pass - Major Risk 12,525.46 8,591.08 8,325.00 7,534.01 34.07 68.77 73.51 5,513.54 2.1 D4.49 10.937 1,174.38 326.60 996.63 Pass - Major Risk 12,525.46 8,591.08 8,350.00 7,554.50 34.07 69.17 72.97 5,518.04 2,090.88 10.937 1,156.97 327.79 976.27 Pass - Major Risk 12,525.46 8,591.08 8,375.00 7,574.98 34.07 69.57 72.41 5,522.48 2,077.25 10.937 1,139.83 328.98 956.08 Pass - Major Risk 12,533.80 8,591.09 8,300.00 7,513.52 34.11 68.37 75.01 5,508.98 2,118.07 10.937 1,191.96 326.58 1,016.74 Pass - Major Risk 12,539.57 8,591.12 8,275.00 7,493.03 34.14 67.97 76.20 5,504.37 2,131.62 10.937 1,209.72 324.47 1,037.06 Pass - Major Risk 12,550.00 8,591.19 8,225.00 7,451.94 34.19 67.18 78.37 5,495.10 2,158.57 10.937 1,245.85 322.20 1,078.12 Pass - Major Risk 12,550.00 8,591.19 8,250.00 7,472.51 34.19 67.58 77.91 5,499.72 2,145.12 10.937 1,227.70 323.38 1,057.30 Pass - Major Risk 12,556.62 8,591.26 8,200.00 7,431.33 34.22 66.79 79.59 5,490.51 2,171.95 10.937 1,264.24 321.04 1,098.78 Pass - Major Risk 12,562.22 8,591.32 8,175.00 7,410.68 34.25 66.40 80.67 5,485.93 2,185.27 10.937 1,282.84 319.84 1,119.62 Pass - Major Risk 12,567.80 8,591.40 8,150.00 7,390.04 34.28 66.01 81.72 5,481.39 2,198.63 10.937 1,301.59 318.63 1,140.54 Pass - Major Risk 12,575.00 8,591.52 8,100.00 7,348.86 34.31 65.22 83.31 5,472.47 2,225.55 10.937 1,339.54 316.19 1,182.77 Pass - Major Risk 12,575.00 8,591.52 8,125.00 7,369.43 34.31 65.61 82.95 5,476.91 2,212.06 10,937 1,320.49 317.37 1,161.45 Pass - Major Risk 12,584.52 8,591.71 8,075.00 7,328.31 34.35 64.83 84.76 5,468.08 2,239.10 10.937 1,358.70 314.85 1,203.66 Pass - Major Risk 12,590.03 8,591.84 8,050.00 7,307.74 34.38 64.43 85.73 5,463.77 2,252.63 10.937 1,378.06 313.54 1,224.87 Pass - Major Risk 12,600.00 8,592.09 7,975.00 7,245.81 34.42 63.26 87.77 5,451.31 2,293.06 10,937 1,437.21 309.74 1,289.48 Pass - Major Risk 12,600.00 8,592.09 8,000.00 7,266.48 34.42 63.65 87.48 5,455.39 2,279.60 10.937 1,417.31 310.91 1,267.67 Pass - Major Risk 12,600.00 8,592.09 8,025.00 7,287.12 34.42 64.04 87.19 5,459.54 2,266.13 10.937 1,397.62 312.09 1,245.99 Pass - Major Risk 12,611.58 8,592.42 7,950.00 7,225.12 34,47 62.87 89.36 5,447.30 2,306.51 10.937 1,457.19 308.18 1,310.74 Pass - Major Risk 12,616.84 8,592.59 7,925.00 7,204.41 34.49 62.48 90.21 5,443.37 2,319.95 10.937 1,477.35 306.81 1,332.42 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 12/6/2016 2:32:09PM Page 6 COMPASS 5000.1 Build 81B .0400. BP !0„01 p Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB IDS 03 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 03-27 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 03-27A Database: Reference Design: 03-27A WP05 Offset TVD Reference: r/..2 BAKER HUGHES Well 03-27 Mean Sea Level Kelly Bushing / Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 09 - 09-04 - 09-04A - 09-04A offset site Error: 0.00 usft Survey Program: 149-CBMAG-MS. 8886-EMS Rule Assigned: Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference offset Toofface + Offset Wellbore Centre Casing - Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +El-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 11,839.34 8.702.77 10,106.00 9,152.82 32.40 78.54 -20.14 5,855.82 1,483.48 9,625 912.05 322.68 621.20 Pass - Major Risk 11,839.98 8,702.77 10,100.00 9,147.13 32.40 78.53 -19.77 5,854.73 1,485.04 9.625 908.54 322.27 618.89 Pass - Major Risk 11,842.67 8,702.78 10,075.00 9,123.42 32.40 78.51 -18.23 5,850.21 1,491.56 9.625 894.21 321.68 606.89 Pass - Major Risk 11,850.00 8,702.79 9,950.00 9,005.04 32.41 78.30 -10.65 5,827.54 1,524.67 9.625 829.99 321.44 528.72 Pass - Major Risk 11,850.00 8,702.79 9,975.00 9,028.70 32.41 78.34 -12.07 5,832.11 1,518.01 9.625 841.77 321.55 543.14 Pass- Major Risk 11,850.00 8,702.79 10,000.00 9,052.37 32.41 78.38 -13.45 5,836.64 1,511.38 9.625 854.11 321.67 558.20 Pass - Major Risk 11,850.00 8,702.79 10,025.00 9,076.06 32.41 78.43 -14.79 5,841.15 1,504.77 9.625 866.98 321.78 573.86 Pass - Major Risk 11,850.00 8,702.79 10,050.00 9,099.73 32.41 78.47 -16.09 5,845.68 1,498.14 9.625 880.37 321.89 590.10 Pass - Major Risk 11,859.39 8,702.80 9,925.00 8,981.39 32.41 78.26 -8.06 5,822.94 1,531.35 9.625 818.63 321.70 514.65 Pass - Major Risk 11,862.25 8,702.81 9,900.00 8,957.76 32.41 78.22 -6.21 5,818.31 1,538.06 9.625 807.92 321.70 501.44 Pass - Major Risk 11,865.14 8,702.81 9,875.00 8,934.12 32.41 78.18 4.33 5,813.66 1,544.75 9.625 797.79 321.68 488.95 Pass - Major Risk 11,868.03 8,702.81 9,850.00 8,910.49 32.41 78.14 -2.40 5,808.99 1,551.43 9.625 788.28 321.67 477.21 Pass - Major Risk 11,875.00 8,702.82 9,750.00 8,815.97 32.42 77.98 5.11 5,790.21 1,578.14 9.625 756.98 321.50 438.91 Pass - Major Risk 11,875.00 8,702.82 9,775.00 8,839.59 32.42 78.02 3.39 5,794.91 1,571.44 9.625 763.72 321.63 447.04 Pass - Major Risk 11,875.00 8,702.82 9,800.00 8,863.22 32.42 78.06 1.71 5,799.61 1,564.76 9.625 771.21 321.76 456.16 Pass - Major Risk 11,875.00 8,702.82 9,825.00 8,886.85 32.42 78.10 0.05 5,804.31 1,558.09 9.625 779.44 321.88 466.21 Pass - Major Risk 11,882.73 8,702.83 9,725.00 8,792.35 32.42 77.94 7.79 5,785.51 1,584.85 9.625 750.92 321.77 431.48 Pass - Major Risk 11,885.72 8,702.84 9,700.00 8,768.73 32.42 77.90 9.93 5,780.81 1,591.55 9,625 745.65 321.78 425.21 Pass - Major Risk 11,888.71 8,702.84 9,675.00 8,745.10 32.42 77.86 12.09 5,776.10 1,598.24 9.625 741.15 321.80 419.97 Pass - Major Risk 11,891.72 8,702.85 9,650.00 8,721.48 32.42 77.82 14.27 5,771.39 1,604.91 9.625 737.42 321.80 415.78 Pass - Major Risk 11,900.00 8,702.86 9,550.00 8,626.82 32.42 77.67 22.68 5,752.74 1,631.23 9.625 730.74 321.65 410.30 Pass- Major Risk, CC 11,900.00 8,702.86 9,575.00 8,650.52 32.42 77.71 20.82 5,757.35 1,624.73 9.625 731.14 321.78 409,87 Pass - Major Risk, ES, SF 11,900.00 8,702.86 9,600.00 8,674.19 32.42 77.75 18.95 5,762.00 1,618.17 9.625 732.40 321.90 410.62 Pass - Major Risk 11,900.00 8,702.86 9,625.00 8,697.84 32.42 77.78 17A0 5,766.68 1,611.57 9.625 734.54 322.02 412.56 Pass - Major Risk 11,906.70 8,702.87 9,525.00 8,603.11 32.42 77.63 25.36 5.748,16 1,637.69 9.625 731.14 321.78 411.59 Pass - Major Risk 11,909.68 8,702.87 9,500.00 8,579.39 32.42 77.60 27.58 5,743.59 1,644.13 9.625 732.39 321.75 414A4 Pass - Major Risk 11,912.66 8,702.88 9,475.00 8,555.66 32.42 77.56 29.79 5,739.03 1,650.56 9,625 734.46 321.72 417.76 Pass- Major Risk 11,915.65 8,702.88 9,450.00 8,531.93 32.42 77.52 31.99 5,734.47 1,656.98 9.625 737.35 321.69 422.47 Pass - Major Risk 12,311.09 8,626.12 9,425.00 8,508.21 33.08 77.48 0.47 5,729.91 1,663.41 9.625 736.77 334.78 411.94 Pass - Major Risk 12,315.52 8,625.07 9,400.00 8,484.51 33.10 77.44 2.88 5,725.33 1,669.90 9,625 735.27 335.36 411.50 Pass - Major Risk 12,325.00 8,622.84 9,325.00 8,413.50 33.15 77.33 9.54 5,711.49 1,689.70 9.625 735.29 336.47 416.31 Pass- Major Risk 12,325.00 8,622.84 9,350.00 8,437.15 33.15 77.36 7.80 5,716.12 1,683.05 9.625 734.51 336.56 413.71 Pass - Major Risk 12,325.00 8,622.84 9,375.00 8,460.82 33.15 77.40 6.07 5,720.74 1,676.45 9.625 734.56 336.65 412.24 Pass - Major Risk 12,333.76 8,620.78 9,300.00 8,389.87 33.19 77.29 12.60 5,706.85 1,696.39 9.625 736.76 337.58 419.96 Pass- Major Risk 12,338.45 8,619.68 9,275.00 8,366.24 33.21 77.25 15.02 5,702.19 1,703.12 9.625 739.01 338.11 424.59 Pass - Major Risk 12,343.20 8,618.56 9,250.00 8,342.64 33.23 77.21 17.44 5,697.51 1,709.90 9.625 741.98 338.63 430.17 Pass - Major Risk 12,350.00 8,616.97 9,200.00 8,295.57 33.26 77.13 21.80 5,687.97 1,723.80 9.625 749.91 339.27 443.96 Pass- Major Risk 12,350.00 8,616.97 9,225.00 8,319.08 33.26 77.17 20.15 5,692.77 1,716.79 9.625 745.62 339.37 436.63 Pass - Major Risk 12,357.90 8,615.13 9,175.00 8,272.11 33.30 77.09 24.63 5,683.09 1,730.92 9.625 754.79 340.10 452.02 Pass - Major Risk 12,362.95 8,613.95 9,150.00 8,248.70 33.32 77.05 26.99 5,678.15 1,738.16 9.625 760.30 340.57 460.89 Pass - Major Risk 12,368.08 8,612.76 9,125.00 8,225.33 33.35 77.00 29.33 5,673.12 1,745.50 9.625 766.40 341.02 470.48 Pass - Major Risk 12,375.00 8,611.15 9,075.00 8,178.75 33.38 76.92 33.42 5,662.83 1,760.48 9.625 780.30 341.52 491.85 Pass - Major Risk 12,375.00 8,611.15 9,100.00 8,202.02 33.38 76.96 31.92 5,668.02 1,752.94 9.625 773.07 341.62 480.75 Pass - Major Risk 12,383.91 8,609.09 9,050.00 8,155.53 33.42 76.88 36.23 5,657.60 1,768.11 9.625 788.07 342.27 503.35 Pass - Major Risk 12,389.34 8,607.84 9,025.00 8,132.34 33.44 76.83 38.48 5,652.36 1,775.86 9.625 796.44 342.65 515.62 Pass - Major Risk 12,398.81 8,605.67 9,000.00 8,109.19 33.49 76.79 41.30 5,647.13 1,783.72 9.625 805.40 343.33 528.37 Pass - Major Risk 12,400.00 8,605.40 8,950.00 8,063.03 33.49 76.70 44.04 5,636.67 1,799.84 9.625 824.89 343.19 556.22 Pass - Major Risk 12,400.00 8,605.40 8,975.00 8,086.08 33.49 76.75 42.73 5,641.90 1,791.69 9.625 814.86 343.30 541.96 Pass - Major Risk CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 121612016 2:32:09PM Page 7 COMPASS 5000.1 Build 81B 'poilliq h BP [/,b� DPTravelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 03 Site Error: 0.00 usft Reference Well: 03-27 Well Error: 0.00 usft Reference Wellbore 03-27A Reference Design: 03-27A WP05 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 03-27 Mean Sea Level Kelly Bushing / Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 09 - 09-04 - 09-04A - 09-04A offset site Error: 0.00 use Survey Program: 149-CB-MAG-MS, 8886-EMS Rule Assigned: Major Risk Offset Well Error: 0.00 use Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference offset Toofface + Offset Wellbore Centre Casing - Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (I (usft) (usft) (in) (usft) (usft) (usft) 12,410.31 8,603.15 8,925.00 8,040+06 33.54 76.66 46.08 5,631+45 1,808.20 9.625 835.32 343.75 570.45 Pass - Major Risk 12,415.25 8,602.14 8,900.00 8,017.16 33.56 76.61 47.68 5.626.25 1,816.78 9.625 846.26 343.95 585.40 Pass- Major Risk 12,425.00 8,600.28 8,825.00 7,949.32 33.60 76.03 51.84 5,610.70 1,844.70 9.625 881.35 342.89 633.45 Pass - Major Risk 12,425.00 8,600+28 8,850.00 7,971.73 33.60 76.26 50.73 5,615.87 1,834.89 9.625 869.33 343.55 616.95 Pass - Major Risk 12,425.00 8,600.28 8,875.00 7,994.35 33.60 76.49 49.58 5,621.05 1,825.60 9.625 857.67 344.20 600.76 Pass - Major Risk 12,435A3 8,598.52 8,800.00 7,927.15 33.65 75.81 53.63 5,605.55 1,855.02 9.625 893.55 342.85 649.56 Pass - Major Risk 12,440.22 8,597.71 8,775.00 7,9D5.21 33.67 75.58 55.00 5,6D0.42 1,865.86 9.625 906.04 342.49 666.11 Pass - Major Risk 12,450.00 8,596.28 8,700.00 7,840.93 33.72 74.90 58.49 5,585.17 1,901.34 9.625 944.77 341.07 716.73 Pass - Major Risk 12,450.00 8,596.28 8,725.00 7,862.09 33.72 75.13 57.59 5,590.23 1,889.02 9.625 931.64 341.73 699.57 Pass - Major Risk 12,450.00 8,596.28 8,750.00 7,883.52 33.72 75.35 56.65 5,595.31 1,877.19 9.625 918.77 342.38 682.59 Pass - Major Risk 12,461.03 8,594.87 8,675.00 7,820.06 33.77 74.67 60.09 5,580.14 1,914.15 9.625 957.95 341.01 733.30 Pass - Major Risk 12,466.33 8,594.27 8,650.00 7,799.48 33.79 74.44 61.26 5,575.15 1,927.43 9.625 971.34 340.63 750.24 Pass - Major Risk 12,475.00 8,593.41 8,575.00 7,738.45 33.83 73.28 64.12 5,560.25 1,968A0 10.937 1,013.17 337.75 803.32 Pass - Major Risk 12,475.00 8,593.41 8,600+00 7,758.79 33.83 73.69 63.38 5,565.22 1,954.74 10.937 998.83 338.95 785.10 Pass - Major Risk 12,475.00 8,593.41 8,625.00 7,779.13 33.83 74.09 62.61 5,570.18 1,941.08 10.937 984.92 340.16 767.23 Pass- Major Risk 12,486.90 8,592.44 8,550.00 7,718.10 33.89 72.87 65.61 5,555.30 1,982.05 10.937 1,027.71 337.12 821.09 Pass- Major Risk 12,491.78 8,592.12 8,525.00 7,697.73 33.91 72.46 66.62 5,550.38 1,995.68 10.937 1,042.67 336.16 839.55 Pass - Major Risk 12,500.00 8,591.67 8,450.00 7,636.41 33.95 71.25 69.10 5,536.10 2,036.45 10.937 1,089.84 332.93 896.92 Pass- Major Risk 12,500.00 8,591.67 8,475.00 7,656.88 33.95 71.66 68.47 5,540.78 2,022.88 10.937 1,073.73 334.13 877.38 Pass - Major Risk 12,500.00 8,591.67 8,500.00 7,677.32 33.95 72.06 67.81 5,545+54 2,OD9.29 10.937 1,058.04 335.33 858.15 Pass - Major Risk 12,510.26 8,591.29 8,425+00 7,615.94 34.00 70.85 70.34 5,531.50 2,050.03 10.937 1,106.16 332.19 916.10 Pass - Major Risk 12,514.64 8,591.19 8,400.00 7,595.46 34.02 70.45 71.20 5,526.95 2,063.63 10.937 1,122.82 331.17 935.80 Pass - Major Risk 12,525+46 8,591.08 8,325.00 7,534.01 34.07 69.25 73.51 5,513.54 2,104.49 10.937 1,174.38 328.02 996.04 Pass - Major Risk 12,525.46 8,591.08 8,350.00 7,554.50 34.07 69.65 72.97 5,518.04 2,090.88 10.937 1,156.97 329.22 975.67 Pass - Major Risk 12,525.46 8,591+08 8,375.00 7,574.98 34.07 70.05 72.41 5,522.48 2,077.25 10.937 1,139.83 330.42 955.47 Pass - Major Risk 12,533.80 8,591.09 8,300.00 7,513.52 34.11 68.84 75.01 5,508.98 2, 118.07 10.937 1,191.96 326.99 1,016.17 Pass - Major Risk 12,539.57 8,591.12 8,275.00 7,493.03 34.14 68.44 76.20 5,504.37 2,131.62 10.937 1,209.72 325.88 1,036.50 Pass - Major Risk 12,550.00 8,591.19 8,225.00 7,451.94 34A9 67.65 78.37 5,495.10 2,158.57 10.937 1,245.85 323.60 1,077.58 Pass - Major Risk 12,550.00 8,591+19 8,250.00 7,472.51 34.19 68.05 77.91 5,499.72 2,145.12 10.937 1,227.70 324.79 1,056.75 Pass - Major Risk 12,556.62 8,591.26 8,200.00 7,431.33 34.22 67.25 79.59 5,490.51 2,171.95 10.937 1,264.24 322.42 1,098.26 Pass - Major Risk 12,562.22 8,591.32 8,175.00 7,410.68 34.25 66.86 80.67 5,485.93 2,185.27 10.937 1,2a2.84 321.22 1,119.11 Pass - Major Risk 12,567.80 8,591.40 8,150.00 7,390.04 34.28 66.46 81.72 5,481.39 2,198.63 10.937 1,301.59 320.00 1,140.04 Pass - Major Risk 12,575.00 8,591.52 8,100.00 7,348.86 34.31 65.67 83.31 5,472.47 2,225.55 10.937 1,339.54 317.54 1,182.29 Pass - Major Risk 12,575.00 8,591.52 8,126.00 7,369.43 34.31 66.07 82.95 5,476.91 2,212.06 10.937 1,320.49 318.73 1,160.96 Pass - Major Risk 12,584.52 8,691.71 8,075.00 7,328.31 34.35 65.28 84.76 5,468.08 2,239.10 10.937 1,358.70 316.19 1,203.20 Pass - Major Risk 12,590.03 8,591.84 8,050.00 7,307.74 34.38 64.88 85.73 5,463.77 2,252.63 10.937 1,378.06 314.88 1,224.42 Pass - Major Risk 12,600.00 8,592+09 7,975.00 7,245.81 34.42 63.70 87.77 5,451.31 2,293.06 10.937 1,437.21 311.06 1,289.06 Pass - Major Risk 12,600.00 8,592.09 8,000.00 7,266.48 34.42 64.09 87.48 5,455.39 2,279.60 10.937 1,417.31 312.23 1,267.23 Pass - Major Risk 12,600.00 8,592.09 8,025.00 7,287.12 34.42 64.49 87.19 5,459.54 2,266.13 10.937 1,397.62 313.42 1,245.54 Pass - Major Risk 12,611.58 8,592.42 7,950.00 7,225.12 34.47 63.31 89.36 5,447.30 2,306.51 10,937 1,457.19 309.49 1,310.32 Pass - Major Risk 12,616.84 8,592.59 7,925.00 7,204.41 34A9 62.92 90.21 5,443.37 2,319.95 10.937 1,477.35 308.11 1,332.01 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 12/6/2016 2:32:09PM Page 8 COMPASS 5000.1 Build 81B BP pTravelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 03 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 03-27 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 03-27A Database: Reference Design: 03-27A WP05 Offset TVD Reference: rG.I BAKER HUGHES Well 03-27 Mean Sea Level Kelly Bushing / Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 09 - 09-16 - 09-16 - 09-16 Offset Site Error. 0.00 usft Survey Program: 530-CB-MAG-MS Rule Assigned: Major Risk Offset Well Error. 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference offset Toolface+ Offset Wellbore Centre Casing - Cemre to No Go Allowable Warning Depth Depth Depth Depth ALmuth +NI-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (') (usft) (usft) (in) (usft) (usft) (usft) 10,864.01 8,629.58 11,425.00 8,328.61 31.10 183.09 -33.34 5,854.52 -648.48 3.562 1,479.32 475.90 1,041.98 Pass - Major Risk 10,875.00 8,626.58 11,300.00 8,244.31 31.12 180.25 -28.46 5,839.20 -557.47 3.562 1,423.21 477.00 985.59 Pass- Major Risk 10,875+00 8,626.58 11,325.00 8,261+01 31.12 180.81 -29.13 5,842.18 -575.83 3.562 1,433.87 478.13 996.68 Pass - Major Risk 10,875.00 8,626.58 11,350.00 8,277.79 31.12 181.38 -29.79 5,845.20 -594.11 3.562 1,444.84 479.25 1,008.13 Pass - Major Risk 10,875.00 8,626.58 11,375+00 8,294.65 31.12 181.95 -30.44 5,848.27 -612.32 3.562 1,456.10 480.38 1,019.93 Pass - Major Risk 10,875.00 8,626.58 11,400.00 8,311.59 31.12 182.52 -31.09 5,851.37 -630.44 3.562 1,467.65 481.50 1,032.08 Pass- Major Risk 10,886.62 8,623.51 11,275.00 8,227.69 31.15 179.68 -26.10 5,836.25 -539.02 3.562 1,412.66 482.59 977.16 Pass - Major Risk 10,890.57 8,622.49 11,250.00 8,211.15 31.15 179.11 -24.85 5,833.35 -520.50 3.562 1,402.47 483.66 967.49 Pass- Major Risk 10,900.00 8,620.11 11,150.00 8,145.82 31.18 176S3 -20.71 5,822.16 -445.62 3.562 1,364.60 484.12 931.02 Pass - Major Risk 10,900+00 8,620AI 11,175.00 8,162.03 31.18 177.40 -21.42 5,824.89 -464.46 3.562 1,373.60 485.30 940.04 Pass - Major Risk 10,900.00 8,620,11 11,200.00 8,178.32 31.18 177.97 -22.12 5,827.67 483.2.2 3.562 1,382.93 486.48 949.49 Pass - Major Risk 10,900.00 8,620.11 11,225.00 8,194.70 31.18 178.54 -22.82 5,830.49 -501.90 3.562 1,392.60 487.67 959.36 Pass - Major Risk 10,911.07 8,617.40 11,125.00 8,129.70 31.20 176.26 -18.44 5,819.46 -426.71 3.562 1,355.78 488.72 924.47 Pass - Major Risk 10,915.33 8,616.39 11,100.00 8,113.66 31.21 175.69 -17.12 5,816.81 -407.72 3.562 1,347.33 489.68 916.98 Pass - Major Risk 10,925.00 8,614.14 11,000.00 8,050.34 31.23 173.41 -12.85 5,806.61 -331.00 3.562 1,316.70 489.54 889.51 Pass- Major Risk 10,925.00 8,614.14 11,025.00 8,066.04 31.23 173.98 -13.59 5,809.09 -350.29 3.562 1,323.83 490.77 896.20 Pass - Major Risk 10,925.00 8,614.14 11,050.00 8,081.83 31.23 174.55 -14.33 5,811.62 -369.51 3.562 1,331.34 492.01 903.35 Pass - Major Risk 10,925.00 8,614.14 11,075.00 8,097.70 31.23 175.12 -15.06 5,814.19 -388.65 3.562 1,339.22 493.25 910.98 Pass - Major Risk 10,937.43 8,611.36 10,975.00 8,034+72 31.26 172.84 -10.41 5,804.16 -311.63 3.562 1.309.73 494.13 885.41 Pass - Major Risk 10,950.00 8,608+69 10,875.00 7,972.76 31.28 170.49 -5.69 5,794.62 -233.72 3.562 1,285.81 494.73 867.08 Pass - Major Risk 10,950.00 8,608.69 10,900.00 7,988.24 31.28 171.09 -6.45 5,797.00 -253.21 3.562 1,291.17 496.07 871.42 Pass- Major Risk 10,950.00 8,608.69 10,925.00 8,003.71 31.28 171.68 -7.21 5,799.38 -272.70 3.562 1,296.99 497.42 876.36 Pass - Major Risk 10,950.00 8,608.69 10,950.00 8,019.19 31.28 172.28 -7.96 5,801.75 -292.19 3.562 1,303.27 498.75 881.90 Pass - Major Risk 10,960.76 8,606.51 10,850.00 7,957.28 31.31 169.90 -3.48 5,792.24 -214.23 3.562 1,280.74 498.69 865.03 Pass- Major Risk 10,965.54 8,605.58 10,825.00 7,941.80 31.32 169.31 -2.08 5,789.86 -194.74 3.562 1,276.14 499.60 862.49 Pass- Major Risk 10,975+00 8,603.78 10,750.00 7,895.48 31.34 167.52 1.51 5,782.72 -136.20 3.562 1,264.71 499.80 857.11 Pass- Major Risk, ES, SF 10,975.00 8,603.78 10,775.00 7,910.90 31.34 168.11 0.73 5,785.10 -155.73 3,562 1,268.10 501.20 858.89 Pass - Major Risk 10,975.00 8,603.78 10,800.00 7,926.34 31.34 168.71 -0.05 5,787.48 -175.25 3.562 1,271.96 502.60 861.27 Pass- Major Risk 10,985.02 8,601.97 10,725.00 7,880,08 31.36 166.92 3.60 5,780.32 -116.65 3.562 1,261.63 502.83 857.33 Pass- Major Risk 10,989.95 8,601.11 10,700.00 7,864.65 31.37 166.33 5.03 5,777.79 -97.14 3.562 1,258.96 503.53 857.28 Pass - Major Risk 11,000.00 8,599.42 10,625.00 7,818.10 31.39 164.54 8,73 5,769.14 -38.98 3.562 1,253.20 503.41 859.58 Pass - Major Risk 11,000.00 8,599.42 10,650.00 7,833.65 31.39 165.14 7,92 5,772.19 -58.31 3.562 1,254.73 504.83 858.77 Pass - Major Risk 11,000.00 8,599.42 10,675.00 7,849.17 31.39 165.73 7.11 5,775.08 -77.70 3.562 1,256.70 506.26 858.56 Pass - Major Risk 11,009.65 8,597.89 10,600.00 7,802.59 31.41 163.95 10.77 5,765.99 -19.63 3.562 1,251.94 505.77 862.13 Pass - Major Risk 11,014.61 8,597.14 10,575.00 7,787.12 31.42 163.35 12.20 5,762.74 -0.26 3.562 1,251+04 506.21 864.49 Pass- Major Risk 11,025.00 8,595.63 10,500.00 7,741.07 31.44 161.55 15.93 5,752.72 58.08 3.562 1,250.45 505.59 873.62 Pass - Major Risk 11,025.00 8,595.63 10,525.00 7,756.34 31.44 162.15 15.13 5,756.02 38.57 3.562 1,250.26 507.07 870.56 Pass - Major Risk, CC 11,025.00 8,595.63 10,550.00 7,771.70 31.44 162.75 14.32 5,759.40 19.13 3.562 1,250.51 508.55 868.02 Pass - Major Risk 11,034.80 8,594.30 10,475.00 7,725.89 31.46 160.94 17.94 5,749.50 77.69 3.562 1,250+95 507.46 878.25 Pass- Major Risk 11,039.99 8,593.63 10,450.00 7,710.81 31.47 160.34 19.36 5,746.36 97.38 3.562 1,251.86 507.66 882.74 Pass - Major Risk 11,050.00 8,592.41 10,375.00 7,666.13 31.49 158.49 22.90 5,736.98 156.88 3.562 1,256.62 506.15 898.02 Pass - Major Risk 11,050.00 8,592.41 10,400+00 7,680.93 31.49 159.11 22.13 5,740.12 136.98 3.562 1,254.68 507.72 892.88 Pass - Major Risk 11,050.00 8,592.41 10,425.00 7,695.83 31.49 159.72 21.36 5,743.24 117.15 3.562 1,253.14 509.28 888.21 Pass - Major Risk 11,061A8 8,591.15 10,350.00 7,651.42 31.51 157.88 25.00 5,733.84 176.85 3.562 1,258.79 507.88 904.58 Pass - Major Risk 11,066+57 8,590.59 10,325.00 7,636.73 31.52 157.26 26.40 5,730+77 196.84 3.562 1.261.44 507.79 911.07 Pass - Major Risk 11,075.00 8,589.77 10,250.00 7,592.65 31.54 155.39 29.59 5,722.10 256.90 3.562 1,272.18 505.19 932.75 Pass - Major Risk 11,075.00 8,589.77 10,275+00 7,607.34 31.54 156.02 28.86 5,724.93 236.87 3.562 1,268.12 506.82 925.26 Pass- Major Risk 11,075.00 8,589.77 10,300.00 7,622.03 31.54 156.64 28.13 5,727.80 216.85 3.562 1,264.56 508.45 918.31 Pass- Major Risk CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 121612016 2:32:09PM Page 9 COMPASS 5000.1 Build 81B z N,4W by 00 Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 03 Site Error: 0.00 usft Reference Well: 03-27 Well Error: 0.00 usft Reference Wellbore 03-27A Reference Design: 03-27A WP05 BP Travelling Cylinder Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: ri.a BAKER HUGHES Well 03-27 Mean Sea Level Kelly Bushing / Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Offset Design PB DS 09 - 09-16 - 09-16 - 09-16 Offset site Error: 0.00 usft Survey Program: 530-CB-MAG-MS Rule Assigned: Major Risk Offset Well Error: 0.00 usft Reference offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toogace + Offset Wellbore Centre Casing - Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) 1'1 (usft) (usft) (in) (usft) (usft) (usft) 11,088.50 8,588.58 10,225.00 7,578.01 31.56 154.77 31.87 5,719.18 276.96 4.937 1,276.37 507.04 941.42 Pass - Major Risk 11,100.00 8,587.71 10,150.00 7,534.38 31.58 152.90 35.30 5,7D9.88 337.25 7.562 1,291.04 504.90 967.47 Pass - Major Risk 11,100.00 8,587.71 10,175.00 7,548.88 31.58 153.53 34.61 5,713.05 317.13 - 7.562 1,285.82 506.58 958.63 Pass - Major Risk 11,100.00 8,587.71 10,200.00 7,563.42 31.58 154.15 33.91 5,716.16 297.03 7.562 1,281.00 508.26 950.23 Pass - Major Risk 11,110.73 8,587.02 10,125.00 7,519.94 31.60 152.27 37.20 5,706.70 357.40 7.562 1,296.52 505.49 977.30 Pass - Major Risk 11,116.34 8,586.70 10,100.00 7,505.54 31.61 151.64 38.50 5,703.52 377.59 7.562 1,302.35 504.91 987.13 Pass - Major Risk 11,125.00 8,586.26 10,050+00 7,476.84 31.62 150.38 40.77 5,697.21 418.05 7.562 1,315.07 503.09 1,007.63 Pass - Major Risk 11,125.00 8,586.26 10,075.00 7,491.18 31,62 151.01 40.13 5,700.33 397.81 7.562 1,308.53 504.83 997.45 Pass - Major Risk 11,133.31 8,585.91 10,025.00 7,462.50 31.63 149.75 42.33 5,694.19 438.30 7.562 1,322.00 502.82 1,018.63 Pass - Major Risk 11,139.01 8,585.70 10,000.00 7,448.16 31,64 149.12 43.57 5,691.26 458.57 7.562 1,329.34 502.02 1,029.84 Pass - Major Risk 11,150.00 8,585.40 9,925.00 7,405.37 31.66 147.22 46.52 5,683.01 519.60 7.562 1,353.50 498.63 1,065.04 Pass - Major Risk 11,150.00 8,585.40 9,950.00 7,419.56 31.66 147.86 45.95 5,685.67 499.20 7.562 1,345.11 500.39 1,053.17 Pass - Major Risk 11,150.00 8,585.40 9,975.00 7,433.83 31.66 148.49 45.37 5,688.42 478.85 7.562 1,337.10 502.15 1,041.65 Pass - Major Risk 11,162.05 8,585.20 9,900+00 7,391.24 31.68 146.59 48.37 5,680.44 540.07 7.562 1,362.09 498.80 1,077.51 Pass - Major Risk 11,173.17 8,585.14 9,850.00 7,363.14 31.69 145.32 50.62 5,675.43 581.12 7.562 1,380.24 496.82 1,102.74 Pass - Major Risk 11.173.17 8,585.14 9,875.00 7,377.18 31.69 145.95 50.10 5,677.93 560.59 7.562 1,371.05 498.62 1,090.22 Pass - Major Risk 11,175.00 8,585.14 9,800.00 7,335.13 31.70 144.04 51.74 5,670.41 622.23 7.562 1,399.65 493.36 1,128.76 Pass - Major Risk 11,175.00 8,585.14 9,825.00 7,349.12 31.70 144.68 51.24 5,672.92 601.67 7.562 1,389.77 495.17 1,115.62 Pass - Major Risk 11,188.54 8,585+36 9,775.00 7,321.19 31.71 143.40 53.03 5,667.90 642.83 7.562 1,409.60 492.65 1,142.34 Pass - Major Risk 11,200.00 8,585.79 9,675+00 7,266.12 31.73 140.82 55.59 5,657.87 725.70 7.562 1,452.25 486.16 1,197.66 Pass - Major Risk 11,200.00 8,585.79 9,700.00 7,279.81 31.73 141.46 55.13 5,660.32 704.92 7.562 1,441.15 488.02 1,183.57 Pass - Major Risk 11,200.00 8,555.79 9,725.00 7,293.53 31.73 142.11 54.66 5,662.85 684.18 7.562 1,430.41 489.86 1,169.76 Pass - Major Risk 11,200.00 8,585.79 9,750.00 7,307.32 31.73 142.75 54.18 5,665.38 663.48 7.562 1,419.95 491.70 1,156.19 Pass - Major Risk 11,212.66 8,586.55 9,650.00 7,252.46 31.74 140.17 56.76 5,655.51 746.50 7.562 1,463.49 485.21 1,212.18 Pass - Major Risk 11,225.00 8,587.58 9,625.00 7,238.82 31.75 139.52 57.97 5,653.25 767.33 7.562 1,475.19 484.19 1,227.06 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 12/6/2016 2:32:09PM Page 10 COMPASS 5000.1 Build 81B BP FS&§ ��; by Travelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 03 Site Error: 0.00 usft Reference Well: 03-27 Well Error: 0.00 usft Reference Wellbore 03-27A Reference Design: 03-27A WP05 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 03-27 Mean Sea Level Kelly Bushing / Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 09 - 09-31 - 09-31 D - 09-31 D Survey Program: 113-BOSS-GYRO, 3505-GYD-GC-SS, 3889-MWD+IFR+MS-WOCA, 11256-MWD+IFR+MSW0CA, 11756-MWD+IF Rule Assigned: Major Risk Reference Offset Semi Major Axis Offset Site Error: 0,00 usft Offset Well Error. 0,00 usft Measured Vertical Measured Vertical Reference Offset Toofface+ Offset Wellbom Centre Casing - Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N1.5 +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (') (usft) (usft) (in) (usft) (usft) (usft) 11,011.99 8,597.53 13,375.00 8,805.19 31.41 33.93 -37.23 6,275.54 -115.73 3.562 1,465.69 165.53 1,305.29 Pass - Major Risk 11,012.42 8,597.47 13,400.00 8,805.14 31.41 33.92 -37.33 6,254A4 -102.32 3,562 1,441.03 165.50 1,280+70 Pass - Major Risk 11,012.79 8,597.41 13,425.00 8,805.09 31.41 33.91 -37.44 6,233.21 -89.13 3.562 1,416.35 165.47 1,256.11 Pass- Major Risk 11,013.11 8,597.36 13,450.00 8,805.08 31.42 33.90 -37.55 6,211.88 -76.08 3.562 1,391.68 165.44 1,231.52 Pass - Major Risk 11,013.39 8,597.32 13,475.00 8,805.11 31.42 33.88 -37.68 6,190.47 -63.18 3.562 1,367.02 165.41 1,206.95 Pass - Major Risk 11,013.63 8,597.28 13,500.00 8,805+17 31.42 33.87 -37A2 6,168.97 -50.41 3.562 1,342.36 165.38 1,182.38 Pass - Major Risk 11,013.91 8,597.24 13,526+00 8,805.22 31 A2 33.86 -37.97 6,147.53 -37.56 3.562 1,317.73 165.35 1,157.85 Pass - Major Risk 11,014.25 8,597+19 13,550.00 8,805.25 31.42 33.85 -38.11 6,126.17 -24.56 3.562 1,293.11 165.33 1,133.33 Pass - Major Risk 11,014.66 8,597.13 13,575.00 8,805.27 31.42 33.84 -38.25 6,104.92 -11.40 3,562 1,268.52 165.30 1,108.85 Pass - Major Risk 11,015.14 8,597.06 13,600.00 8,805.27 31.42 33.83 -38.39 6,083.74 1.89 3.562 1,243,96 165.27 1,084.40 Pass - Major Risk 11,015.64 8,596.98 13,625.00 8,805.27 31.42 33.83 -38.54 6,062.60 15.22 3.562 1,219.41 165.24 1,059.98 Pass - Major Risk 11,016.18 8,596.90 13,650.00 8,805.26 31.42 33.82 -38.69 6,041.48 28.60 3.562 1,194+89 165.21 1,035.59 Pass - Major Risk 11,016.75 8,596.82 13,675.00 8,805.25 31.42 33.81 -38.85 6,020.38 42.01 3.562 1,170.40 165.17 1,011.22 Pass - Major Risk 11,017.34 8,596.73 13,700.00 8,805.24 31.42 33.80 -39.01 5,999.29 55.44 3.562 1,145.92 165.14 986.89 Pass - Major Risk 11,025.00 8,595.63 13,725.00 8,805.23 31 A4 33.79 -38.31 5,978.19 68.85 3.562 1,121.53 165.14 962.52 Pass - Major Risk 11,025+00 8,595.63 13,750.00 8,805.22 31.44 33.79 -38.56 5,957.06 82.21 3.562 1,097.08 165.10 938.24 Pass - Major Risk 11,025.00 8,595.63 13,775.00 8,805.22 31.44 33.78 -38.83 5,935.92 95.55 3.562 1,072.66 165.06 914.00 Pass- Major Risk 11,025.00 8,595.63 13,800.00 8,805.22 31.44 33.78 -39.11 5,914.73 108.81 3.562 1,048.25 165.03 889.78 Pass - Major Risk 11,025.00 8,595.63 13,825.00 8,805.23 31.44 33.77 -39.41 5,893.46 121.95 3.562 1,023.87 165.00 865.59 Pass - Major Risk 11,025.00 8,595.63 13,850.00 8,805.23 31.44 33.76 -39.71 5,872.11 134.97 3.562 999.50 164.96 841.43 Pass- Major Risk 11,025.00 8,595.63 13,875+00 8,805.25 31.44 33.76 -40.03 5,850.69 147.86 3.562 975.15 164.93 817.28 Pass - Major Risk 11,025.00 8,595.63 13,900.00 8,805.26 31.44 33.76 -40.37 5,829.18 160.60 3.562 950.82 164.90 793.13 Pass - Major Risk 11,025.00 8,595.63 13,925.00 8,805.26 31.44 33.75 -40.72 5,807.59 173.20 3.562 926.52 164.87 769.01 Pass - Major Risk 11,025.00 8,595.63 13,950.00 8,805.27 31.44 33.75 -41.09 5,785.91 185.65 3.562 902.24 164.84 744.94 Pass - Major Risk 11,025.00 8,595.63 13,975.00 8,805+27 31.44 33.75 -41.48 5,764.15 197.95 3.562 877.99 164.81 720.91 Pass- Major Risk 11,025.00 8,595.63 14,000.00 8,805.27 31.44 33.74 -41.89 5,742.38 210.24 3.562 853.78 164.78 696.95 Pass - Major Risk 11,025.00 8,595.63 14,025.00 8,805.26 31.44 33.74 -42.33 5,720.62 222.56 3.562 829.62 164.75 673.05 Pass - Major Risk 11,025.00 8,595.63 14,050.00 8,805.25 31.44 33.74 -42.79 5,698.88 234.90 3.562 805.51 164.72 649.24 Pass - Major Risk 11,025.00 8,595.63 14,075.00 8,805.24 31.44 33.73 -43.27 5,677.17 247.30 3.562 781.46 164.68 625.51 Pass - Major Risk 11,025.00 8,595.63 14,100+00 8,805.24 31.44 33.73 -43.80 5,655.54 259.84 3.562 757.49 164.65 601.89 Pass - Major Risk 11,025.00 8,595.63 14,125.00 8,805.25 31.44 33.73 -44.36 5,634.01 272.54 3.562 733.60 164.62 578.39 Pass - Major Risk 11,025.00 8,595.63 14,150.00 8,805.27 31.44 33.73 -44.96 5,612.57 285.40 3.562 709.82 164.59 555.03 Pass - Major Risk 11,025.00 8,595.63 14,175+00 8,805.30 31.44 33.73 -45.60 5,591.21 298.39 3.562 686.14 164.55 531.83 Pass - Major Risk 11,025.00 8,595.63 14,200.00 8,805.33 31.44 33.73 -46.29 5,569+89 311.45 3.562 662.56 164.52 508.78 Pass - Major Risk 11,025.00 8,595.63 14,225.00 8,805.36 31.44 33.73 -47.03 5,548.62 324.57 3.562 639.11 164,49 485.91 Pass - Major Risk 11,029.81 8,594.96 14,250.00 8,805.39 31.45 33.73 -47.23 5,527.38 337.77 3.562 615.75 164.44 463.16 Pass - Major Risk 11,030.96 8,594.81 14,275.00 8,805.42 31.45 33.73 -47.95 5,506.17 351.00 3.562 592.55 164.40 440.68 Pass - Major Risk 11,032.19 8,594.64 14,300.00 8,805.44 31.45 33.74 -48.72 5,484.98 364.26 3.562 569.49 164.36 418.43 Pass- Major Risk 11,033.50 8,594.47 14,325.00 8,805.45 31.46 33.74 49.57 5,463.80 377.55 3.562 546.61 164.32 396.45 Pass - Major Risk 11,034.90 8,594.28 14,350.00 8,805+45 31.46 33.74 -50.49 5,442.63 390.85 3.562 523.91 164.28 374.76 Pass - Major Risk 11,036.43 8,594.08 14,375.00 8,805.45 31.46 33.75 -51.49 5,421.52 404.23 3.562 501.44 164.23 353.44 Pass - Major Risk 11,038.13 8,593.87 14,400.00 8,805.45 31.47 33.76 -52.59 5,400.46 417.71 3.562 479.22 164.19 332.54 Pass - Major Risk 11,040.00 8,593.63 14,425.00 8,805+45 31.47 33.76 -53.78 5,379.47 431.30 3.562 457.31 164.14 312.11 Pass - Major Risk 11,042.06 8,593.37 14,450.00 8,805.45 31.47 33.76 -55.10 5,358.56 444.98 3.562 435.73 164.09 292.24 Pass - Major Risk 11,044.33 8,593.09 14,475.00 8,805.46 31.48 33.77 -56.56 5,337.69 458.75 3.562 414.54 164.03 273.01 Pass - Major Risk 11,046.83 8,592.78 14,500.00 8,805.47 31.48 33.78 -58.17 5,316.88 472.62 3.562 393.81 163.97 254.54 Pass - Major Risk 11,050.00 8,592.41 14,525.00 8,805.50 31.49 33.79 -59.91 5,296.14 486.57 3.562 373.60 163.90 236.94 Pass - Major Risk 11,052.56 8,592.11 14,550.00 8,805.63 31.49 33.80 -61.96 5,275.44 500.59 3.562 353.99 163.95 220.36 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 12/612016 2:32.09PM Page 11 COMPASS 5000.1 Build 81B byTravelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 03 Site Error: 0.00 usft Reference Well: 03-27 Well Error: 0.00 usft Reference Wellbore 03-27A Reference Design: 03-27A WP05 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 03-27 Mean Sea Level Kelly Bushing / Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 09 - 09-31 - 09-31 D - 09-31 D offset site Error. 0.00 usft Survey Program: 113-BOSS-GYRO, 3505-GYD-GC-SS, 3889-MWD+IFR+MS-WOCA, 11256-MWD+IFR+MS-WOCA, 11756-MWD+IF Rule Assigned: Major Risk Onset Well Error. 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing - Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/.W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (I (usft) (usft) (in) (usft) (usft) (usft) 11,055.75 8.591.75 14,575.00 8,805.58 31.50 33.81 -64.20 5,254.73 514.59 3.562 335.06 164.03 204.94 Pass - Major Risk 11,059.16 8,591.37 14,600.00 8,805.65 31.51 33.81 -66.73 5,234.00 528.56 3.562 316.94 164.11 190.88 Pass- Major Risk 11,062.80 8,590.98 14,625.00 8,805.73 31.51 33.82 -69.57 5,213.25 542.51 3.562 299.77 164.19 178.38 Pass - Major Risk 11,066+76 8,590.57 14,650.00 8,805.82 31.52 33.83 -72.75 5,192.51 556.47 3.562 283.72 164.27 167.67 Pass - Major Risk 11,071.16 8,590.13 14,675.00 8,805.94 31.53 33.85 -76.30 5,171.84 570.54 3.562 269.00 164.36 158.94 Pass - Major Risk 11,076.07 8,589.67 14,700.00 8,806.06 31.54 33.86 -80.22 5,151.24 584.70 3.562 255.82 164.78 152.28 Pass - Major Risk 11,081.54 8,589.17 14,725.00 8,806.21 31.55 33.87 -84.51 5,130.71 598.97 3.562 244.42 164.87 147.60 Pass - Major Risk 11,087.68 8,588.65 14,750.00 8,806.37 31.56 33.88 -89.15 5,110.26 613.34 3.562 235.05 164.96 144.59 Pass - Major Risk 11,094.57 8,588.11 14,775.00 8,806.57 31.57 33.90 -94.07 5,089.89 627.83 3.562 227.91 165.06 142.69 Pass - Major Risk 11,102.35 8,587.55 14,800.00 8,806.80 31.58 33.91 -99.17 5,069+59 642.43 3.562 223.20 165.17 141.25 Pass - Major Risk 11,111.15 8,586.99 14,825.00 8,807.07 31.60 33.93 -104.31 5,049.38 657.13 3.562 221.00 165.29 139.60 Pass - Major Risk, CC 11,120.96 8,586.45 14,850.00 8,807.34 31.62 33.94 -109.36 5,029.16 671.84 3.562 221.31 165.42 137.12 Pass - Major Risk 11,131.90 8,585.96 14,875.00 8,807.61 31.63 33.96 -114.17 5,008.91 686.49 3.562 224.05 165.57 134.12 Pass- Major Risk 11,144.17 8,585.55 14,900.00 8,807.88 31.65 33.98 -118.62 4,988.62 701.09 3.562 229.07 165.73 131.72 Pass - Major Risk 11,158.05 8,585.25 14,925.00 8,808.15 31.67 33.99 -122.56 4,968.30 715.65 3.562 236.15 165.93 130.93 Pass- Major Risk, ES, SF 11,174.08 8,585.14 14,950.00 8,808.42 31.69 34.01 -125.94 4,947.96 730.19 3.562 245.02 166.19 132.21 Pass- Major Risk 11,195.89 8,585.61 14,975.00 8,808.70 31.72 34.03 -129.31 4,927.63 744.74 3.562 255.27 166.60 135.31 Pass - Major Risk 11,219.98 8,587.13 15,000.00 8,808.98 31.75 34.04 -132.22 4,907.29 759.27 3.562 266.56 166.96 139.40 Pass- Major Risk 11,246,59 8,590.02 15,025.00 8,809.27 31.78 34.06 -134.70 4,886.94 773.79 3.562 278.63 167.63 144.50 Pass - Major Risk 11,275.85 8,594.67 15,050.00 8,809.56 31.81 34.08 -136.79 4,866.56 788.26 3.562 291.25 168.51 150.41 Pass- Major Risk 11,307.96 8,601.51 15,075.00 8,809.87 31.83 34.10 -138.53 4,846.14 802.68 3.562 304.20 169.65 156.75 Pass - Major Risk 11,343.05 8,611.04 15,100.00 8,810.19 31.86 34A2 -139.98 4,825.68 817.04 3.562 317.27 171.14 163.26 Pass - Major Risk 11,381.02 8,623.70 15,125.00 8,810.52 31.88 34.14 -141.18 4,805.14 831.29 3.562 330.32 173.07 169.77 Pass - Major Risk 11,421.56 8,639+84 15,150.00 8,810.84 31.89 34.16 -142.20 4,784.46 845.34 3.562 343.27 175.52 176.34 Pass - Major Risk 11,439.37 8,647.70 15,175.00 8,811.16 31.90 34.18 -144.56 4,76365 859.19 3.562 356.38 176.24 187.34 Pass - Major Risk 11,450.00 8,652.27 15,200.00 8,811.48 31.90 34.20 -147.36 4,742.70 872,83 3.562 370.51 176A6 200.68 Pass - Major Risk 11,456.01 8,654.77 15,225.00 8,811.76 31.91 34.23 -149.80 4,721.70 886.39 3.562 385.49 176,15 215.51 Pass - Major Risk 11,464.14 8,658.05 15,250.00 8,811.97 31.91 34.25 -152.14 4,700.70 899.95 3.562 401.16 176.14 230.76 Pass - Major Risk 11,475.00 8,662.27 15,275.00 8,812.12 31.92 34.27 -154.42 4,679+70 913.52 3.562 417.47 176.14 246.39 Pass - Major Risk 11,480.06 8,664.17 15,300.00 8,812.20 31.92 34.29 -156.33 4,658.70 927.08 3.562 434.31 176.18 263.14 Pass- Major Risk 11,487.80 8,666.99 15,325.00 8,812.27 31.93 34.32 -158.19 4,637.63 940.53 3.562 451.78 176.23 280.23 Pass - Major Risk 11,495.36 8,669.64 15,350.00 8,812.34 31.93 34.34 -159.92 4,616.46 953.83 3.562 469.81 176.29 297.91 Pass- Major Risk 11,500.00 8,671.22 15,375.00 8,812.41 31.93 34.37 -161.41 4,595.20 966.98 3562 488.38 176.34 316.34 Pass - Major Risk 11,509.90 8,674.46 15,400.00 8,812.46 31.94 34.39 -163.00 4,573.85 980.00 3.562 507.39 176.44 334.82 Pass - Major Risk 11,516.92 8,676.66 15,425.00 8,812.45 31.95 34.42 -164.38 4,552.45 992.92 3.562 526.78 176.53 353.89 Pass- Major Risk 11,525.00 8,679.08 15,450.00 8,812.35 31.95 34.44 -165.72 4,531.00 1,005.75 3.562 546.51 176.64 373.24 Pass - Major Risk 11,530.43 8,680.64 15,475+00 8,812.18 31.96 34.47 -166.88 4,509.49 1,018.50 3.562 566.55 176.74 393.05 Pass- Major Risk 11,536.99 8,682.46 15,500.00 8,811.96 31.97 34.50 -168.01 4,487.98 1,031.24 3.562 586.82 176.85 413.04 Pass - Major Risk 11,543.55 8,684.19 15,525.00 8,811.75 31.97 34.53 -169.08 4,466.58 1,044.16 3.562 607.22 176.96 433.15 Pass - Major Risk 11,550.00 8,685.83 15,550.00 8,811.54 31.98 34.55 -170.09 4,445.30 1,057.28 3.562 627.70 177.08 453.37 Pass- Major Risk 11,556.65 8,687.44 15,575+00 8,811.35 31.99 34.58 -171.05 4,424.14 1,070.59 3.562 648.27 177.21 473.66 Pass - Major Risk 11,563.18 8,688.94 15,600.00 8,811.14 31.99 34.61 -171.96 4,403.08 1,084+06 3.562 668.92 177.34 494.05 Pass - Major Risk 11,569.65 8,690.35 15,625.00 8,810.87 32.00 34.65 -172.83 4,382.09 1,097.63 3.562 689.67 177.47 514.54 Pass - Major Risk 11,575.00 8,691.46 15,650.00 8,810.54 32.01 34.68 -173.61 4,361.16 1,111.31 3.562 710.51 177.59 535.17 Pass - Major Risk 11,582+44 8,692.92 15,675.00 8,810.15 32.02 34.71 -174.45 4,340.31 1,125.10 3.562 731.43 177.74 555.79 Pass - Major Risk 11,588.76 8,694.07 15,700.00 8,809.77 32.03 34.75 -175.20 4,319.53 1,138.98 3.562 752.43 177.88 576.54 Pass - Major Risk 11,595.02 8,695.15 15,725.00 8,809.44 32.04 34.78 -175.92 4,298.80 1,152.96 3.562 773.53 178.02 597.40 Pass - Major Risk 11,600.00 8,695.95 15,750.00 8,809A7 32,04 34.82 -176.55 4,278.14 1,167.03 3.562 794.71 178.14 618.40 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 12/6/2016 2:32.09PM Page 12 COMPASS 5000.1 Build 81B N�` bhh BP y Travelling Cylinder Report BAKER RUCHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 03 Site Error: 0.00 usft Reference Well: 03-27 Well Error: 0.00 usft Reference Wellbore 03-27A Reference Design: 03-27A WP05 Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 03-27 Mean Sea Level Kelly Bushing / Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB IDS 09 - 09-31 - 09-31 D - 09-31 D Offset Site Error: 0.00 usft Survey Program: 113-BOSS-GYRO, 3505-GYD-GC-SS, 3889-MWD+IFR+MS-WOCA, 11256-MWD+IFR+MS-WOCA, 11756-MWD+IF Rule Assigned: Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing - Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) 1'1 (usft) (usft) (in) (usft) (usft) (usft) 11,607.40 8,697,06 15,775.00 8,808.94 3205.34,86 -177.25 4,257.53 1,181.18 3,562 815.98 17831 639.37 Pass - Major Risk 11,613,42 8,697.88 15,800.00 8,808,69 32,06 34.89 -177,88 4.236,89 1,195.28 3,562 837.39 178,45 660.56 Pass -Major Risk 11,619.29 8,698.62 15,825.00 8,808,42 32,07 34.93 -178.47 4,216,17 1,209,28 3.562 858.97 177.79 681.01 Pass -Major Risk 11,625.00 8,699.28 15,850,00 8,808,13 3208.34,95 -179.03 4,195.44 1,223.24 3,562 880,67 18945 690.88 Pass -Major Risk 11,625,00 8,699.28 15,855,00 8,808.08 32.08 34,96 -179.09 4,191.30 1,226.04 3,562 885,02 191.73 692.88 Pass -Major Risk CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 12/6/2016 2:32.09PM Page 13 COMPASS 5000.1 Build 81B 01#00!61 BP FUG b✓ Travelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB IDS 03 Site Error: 0.00 usft Reference Well: 03-27 Well Error: 0.00 usft Reference Wellbore 03-27A Reference Design: 03-27A WPO5 Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 03-27 Mean Sea Level Kelly Bushing / Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to Kelly Bushing / Rotary Table @ 62.00 Coordinates are relative to: 03-27 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27 ' OGP-Usa AK / Central Meridian is 150' 0' 0.000 W Grid Convergence at Surface is: 1.62 ° Ladder Plot 1600 --- _._,._.. T_._._.__�_ i J _ ..... 1 I I I i I I I 1 - --_- C I I I t I O I 1 I 4% I p 800 I I C) J- - J- ----- - --�-----�---- --- -I- a) () _I_ _ _ _ - _ _ _ - - _ _ J _ - _ - J _ ''.. I I 0 0 2500 5000 7500 10000 12500 15000 Measured Depth LEGEND $ 09-31, 09-31 D, 09-31 D VO = u 03-27, 03-27, 03-27 V1 09-04, 09-04, 09-04 V 1 03-01,03-01A,03-01AVO 09-16,09-16,09-16V1 09-04,09-04A,09-04AV2 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 12/6/2016 2.32:09PM Page 14 COMPASS 5000.1 Build 81B 'e..o BP ri.e Z � p Travelling Cylinder Report BAKER POW HUGHES Company: Project: Reference Site: Site Error: Reference Well: Well Error: Reference Welibore Reference Design: North America - ALASKA - BP Prudhoe Bay PB DS 03 0.00 usft 03-27 0.00 usft 03-27A 03-27A WP05 Local Co-ordinate Reference: Well 03-27 TVD Reference: Mean Sea Level MD Reference: Kelly Bushing / Rotary Table @ 62.00usft North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K - Alaska PROD - ANCP1 Offset TVD Reference: Offset Datum Reference Depths are relative to Kelly Bushing / Rotary Table @ 62.00 Coordinates are relative to: 03-27 Jffset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27 * OGP-Usa AK / central Meridian is 150° 0' 0.000 W Grid Convergence at Surface is: 1.62 ° Separation Factor u 25uu 5000 7500 10000 12500 Meastred Depth LEGEND —9- 09-31, 09-31 D, 09-31 D VO — 03-27, 03-27, 03-27 V1 09-04, 09-04, 09-04 V1 --i4r-- 03-01, 03-01 A, 03-01 A VO , 09-16, 09-16, 09-16 V 1 - — 09-04, 09-04A, 09-04A V2 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 12/6/2016 2:32:09PM Page 15 COMPASS 5000.1 Build 8 1 B U„Nr,L BF z,N by Travelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 03 Site Error: 0.00 usft Reference Well: 03-27 Well Error: 0.00 usft Reference Wellbore 03-27A Reference Design: 03-27A WP05 Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 03-27 Mean Sea Level Kelly Bushing / Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum aference Depths are relative to Kelly Bushing / Rotary Table @ 62.00 Coordinates are relative to: 03-27 ffset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27 . OGP-Usa AK / entral Meridian is 150' 0' 0.000 W Grid Convergence at Surface is: 1.62 ° Travelling Cylinder Pent 1995- 330 30 1710 10975 10�875 11075 300 1140 - -- 60 11025 11862 11175 8652407 11025 57 , 12515 270 11082 90 10185 1�7456 570 11595- 240 1140 120 1425 ; _ 1710_ 210��150 1995 180 Azimuth from North [°] vs Centre to Centre Separation [950 usft/in] LEGEND $ 09-31, 09-31 D, 09-31 D VO - 03-27, 03-27, 03-27 V1 09-04, 09-04, 09-04 V1 -A- 03-01, 03-01A, 03-01A VO -- v - 09-16, 09-16, 09-16 V1 --t— 09-04, 09-04A, 09-04A V2 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 121612016 2:32.09PM Page 16 COMPASS 5000.1 Build 81B W Lug I ; __ m _m .0*'!& I eit by North America - ALASKA - BP Prudhoe Bay PB DS 03 03-27 03-27A 03-27A WP05 Plus 500ft MD AOGCC Offset Well Report 06 December, 2016 BAKER FIU6NE5 BP VbpAnticollision Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 03 Site Error: O.00usft Reference Well: 03-27 Well Error: O.00usft Reference Wellbore 03-27A Reference Design: 03-27A WPO5 Plus 500ft MD Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 03-27 Mean Sea Level Kelly Bushing / Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 03-27A WP05 Plus 500ft MD Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 10,175.00 to 13,343.3lusft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic Survey Tool Program Date 12/6/2016 From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 10,175.00 Survey #2 (03-27) GYD-CT-CMS Gyrodata cont.casing m/s 10,175.00 13,343.31 03-27A WP05 Plus 500ft MD (03-27A) MWD MWD - Standard Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) PB DS 03 03-27 - 03-27 - 03-27 10,175.00 10,175.00 0.00 03-27 - 03-27A - 03-27A WP05 12,843.31 12,843.31 0.00 PB DS 09 12/6/2016 3:45:27PM Page 2 of 7 COMPASS 5000.1 Build 81B BP 41 p Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 03-27 Project: Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB DS 03 MD Reference: Kelly Bushing / Rotary Table @ 62.00usft Site Error: 0.00usft North Reference: True Reference Well: 03-27 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 03-27A Database: EDM R5K - Alaska PROD - ANCP1 Reference Design: 03-27A WP05 Plus 500ft MD Offset ND Reference: Offset Datum Offset Design PB DS 03 - 03-27 - 03-27 - 03-27 Survey Program: 100-GYD-CT-CMS, 10400-BOSS-GYRO Reference Offset Measured Vertical Measured Vertical Offset Wellbore Centre Centre to Depth Depth Depth Depth +N/S +E/-W Centre (usft) (usft) (usft) (usft) (usft) (usft) (usft) 10.175.00 8,531,85 10,175.00 8,531.85 4,366,83 263.58 0.00 10,200.00 8,555.99 10.200.00 8,555.99 4,393,05 265,55 0.00 10,225.00 8,580.16 10,225.00 8,580.16 4,399.13 267,47 0.00 10,250.00 8,604.32 10,250.00 8,604.34 4405,21 269.33 0,07 10,274.88 8,627.99 10,275.00 8,628,50 4411,35 27120 1.39 10,298.89 8,649.58 10,300,00 8,652.65 4,417.52 273.06 6.17 10,321.14 8,668,04 10,325,00 8,676.81 4,423.71 274.84 14.36 10,341.11 8,683.03 10,350,00 8.700,97 4429.91 276,50 25.52 10,358.62 8,694.77 10,375.00 8,725.14 4.436.11 278.04 39,17 10,373.76 8,703,76 10,400.00 8.749.32 4,442.32 279.46 54.85 10,386.79 8,710,57 10,425.00 8,773.49 4,448.57 280.82 72.13 10,398.00 8,715,70 10,450.00 8,797.65 4,454.85 282.18 90.66 10,407.68 8,719,58 10.475.00 8,821.79 4,461.18 283.55 110.20 10.416.06 8.722.51 10,500.00 8,845.93 4,467.55 284.93 130,54 10,423.34 8,724.72 10,525.00 8,870.06 4473.94 286,29 151.55 10,430.00 8,726.47 10,550.00 8,894,20 4,480.32 287.60 173,11 10,435.28 8,727,68 10,575.00 8,918.34 4,486.69 288.87 195.12 Has BAKER HUGHES 121612016 3.45.27PM Page 3 of 7 COMPASS 5000.1 Build 81B b BP r'� s p Anticollision Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 03-27 Project: Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB IDS 03 MD Reference: Kelly Bushing i Rotary Table @ 62.00usft Site Error: 0.00usft North Reference: True Reference Well: 03-27 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 03-27A Database: EDM R5K - Alaska PROD - ANCP1 Reference Design: 03-27A WP05 Plus 500ft MD Offset ND Reference: Offset Datum Offset Design PB DS 03 - 03-27 - 03-27A - 03-27A WP05 Survey Program: 100-GYD-CT-CMS, 10175-MWD Reference offset Measured Vertical Measured Vertical Offset Wellbore Centre Centre to Depth Depth Depth Depth +N/S +EI-W Centre (usft) (usft) Nan) (usft) (usft) (usft) (usft) 10,175.00 8,531.85 10,175.00 8,531,85 4,386.83 263.58 0.00 10,200.00 8.555.99 10,200.00 8,555.99 4,393.05 265.55 0.00 10,225.00 8,580.16 10,225.00 8,580.16 4,399+13 267.47 0.00 10,250.00 8,604.32 10.250.00 8.604.32 4,405.27 269.34 0.00 10,275.00 8,628.07 10,275.00 8,628.10 4,412.68 271.34 0.08 10,300.00 8,650.54 10,300.00 8,650.54 4,423.41 273.64 0.00 10,325.00 8,671.05 10,325.00 8,671.05 4,437.38 276.39 0.00 10,350.00 8,689.16 10,350.00 8,689.16 4,454.26 279.71 0.00 10,375.00 8,704.45 10,375.00 8,704.45 4,473.64 283.52 0.00 10,400.00 8,716+55 10,400.00 8,716.55 4,495.08 287.74 0.00 10.425.00 8,725.18 10,425.00 8,726.18 4,518.07 292.26 0.00 10,450.00 8,730.15 10,450.00 8,730.15 4,542.09 296.98 0.00 10,475.00 8,731.35 10,475.00 8,731.35 4,566.57 301.80 0.00 10.500.00 8,730.21 10,500.00 8,730.21 4,591.12 306.37 0.00 10,525.00 8,727.85 10,525.00 8,727+85 4,615.64 310.60 0.00 10,550.00 8,724.35 10,550.00 8.724.35 4,639.94 315.30 0.00 10,575.00 8,719.74 10,575.00 8,719.74 4,663.93 320.62 0.00 10,600.00 8,714.03 10.600.00 8,714.03 4,687.54 326.52 0.00 10,625+00 8,707.23 10,625.00 8,707.23 4,710.70 333.01 0.00 10,650.00 8,699.36 10,650+00 8,699.36 4,733.36 340.06 0.00 10,675.00 8,690.83 10,675.00 8,690+83 4,755.50 347.90 0.00 10,700.00 8,682.30 10,700.00 8,682.30 4,777.18 356.96 0.00 10,725.00 8,673.81 10,725.00 8,673.81 4,798.34 367.21 0.00 10,750.00 8,665.39 10,750.00 8,665.39 4,818.92 378.64 0.00 10,775.00 8,657.07 10,775.00 8,657.07 4,838.86 391.21 0.00 10,800.00 8,648.85 10,800.00 8,648.85 4,858.11 404.88 0.00 10,825.00 8,640.97 10,825.00 8,640.97 4,876.69 419.62 0.00 10,850+00 8,633.54 10,850.00 8,633.54 4,894.61 435.39 0.00 10,875.00 8,626.58 10,875.00 8,626.58 4,911.80 452.15 0.00 10,900.00 8,620.11 10,900.00 8,620.11 4,928.23 469.84 0.00 10,925.00 8,614.14 10,925.00 8,614.14 4,943.84 488.43 0.00 10,950.00 8,608.69 10,950.00 8,608.69 4,958.59 507.86 0.00 10,975.00 8,603.78 10,975.00 8,603.78 4,972.45 528.08 0.00 11,000.00 8,599.42 11,000.00 8,599.42 4,985.37 549.03 0.00 11,025.00 8,595.63 11,025.00 8,595.63 4,997.33 570.65 0.00 11,050.00 8,592,41 11,050.00 8,592.41 5,008.28 592.89 0.00 11,075.00 8,589.77 11,075.00 8,589.77 5,018.20 615.68 0.00 11,100.00 8,587.71 11,100.00 8,587.71 5,027.06 638.97 0.00 11,125.00 8,586.26 11,125.00 8,586.26 5,034.83 662.68 0.00 11,150+00 8,585.40 11,150.00 8,585.40 5,041.50 686.75 0.00 11,175.00 8,585.14 11,175.00 8,585+14 5,047.04 711.13 0.00 11,200.00 8,585.79 11,200.00 8,585.79 5,051.73 735.67 0.00 11,225.00 8,587.57 11,225.00 8,587.57 5,065.77 760.28 0.00 11,250.00 8,590.48 11,250.00 8,590.48 5,059.14 784.87 0.00 11,275.00 8,594,51 11,275.00 8,594+51 5,061.83 809.40 0.00 11,300.00 8,599.64 11,300.00 8,599.64 5,063.85 833.78 0.00 11,325.00 8,605.87 11,325.00 8,605.87 5,065.17 857.95 0.00 11,350.00 8,613.18 11,350.00 8,613.18 5,065.81 881.85 0.00 12/6/2016 3.45:27PM Page 4 of 7 COMPASS 5000. 1 Build 81B .144 BP IK pAnticollision Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 03-27 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 03 MD Reference: Kelly Bushing / Rotary Table @ 62.00usft Site Error: 0.00usft North Reference: True Reference Well: 03-27 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 03-27A Database: EDM R5K - Alaska PROD - ANCP1 Reference Design: 03-27A WP05 Plus 500ft MD Offset TVD Reference: Offset Datum Offset Design PB DS 03 - 03-27 - 03-27A - 03-27A WP05 survey Program: 100-GYD•CT-CMS, 10175-MWD Reference Offset Measured Vertical Measured Vertical Offset Wellbore Centre Centre to Depth Depth Depth Depth +N/S +PJ-W Centre (usft) (usft) (usft) (usft) (usft) (usft) (usft) 11,375.00 8,621.54 11,375.00 8,621,54 5,065.75 905.41 0.00 11,400.00 8,630.93 11,400,00 8,630.93 5,064.99 928.56 0.00 11,425.00 8,641.33 11,425.00 8,641.33 5,063.55 951.24 0.00 11,450.00 8,652.27 11,450.00 8,652.27 5,061.71 973.65 0.00 11,475.00 8,662.27 11,475.00 8,662.27 5,060.41 996.52 0.00 11,500.00 8,671.22 11,500.00 8,671.22 5,059.73 1,019.85 0.00 11,525.00 8,679.08 11,525.00 8,679.08 5,059.65 1,043.58 0.00 11,550.00 8,685.83 11,550.00 8,685+83 5,060.20 1,067.64 0.00 11,575.00 8,691.46 11,575.00 8,691.46 5,061.36 1,091.97 0.00 11,600.00 8,695.95 11,600.00 8,695.95 5,063.12 1,116.50 0.00 11,625.00 8,699.28 11,625+00 8,699.28 5,065.50 1,141.16 0.00 11,650.00 8,701.46 11,650.00 8,701.46 5,068.47 1,165.88 0.00 11,675.00 8,702.46 11,675.00 8,702.46 5,072.03 1,190.60 0.00 11,700.00 8,702.56 11,700.00 8,702.56 5,075.75 1,215.32 0.00 11,725.00 8,702.60 11,725.00 8,702.60 5,078.27 1,240.19 0.00 11,750.00 8,702.64 11,750.00 8,702.64 5,079.49 1,265.16 0.00 11,775.00 8,702.68 11,775.00 8,702.68 5,079.40 1,290.16 0.00 11,800.00 8,702.72 11,800.00 8,702.72 5,078.00 1,315.11 0.00 11,825.00 8,702.75 11,825.00 8,702.75 5,075.29 1,339.97 0.00 11,850.00 8,702.79 11,850.00 8,702.79 5,071.29 1,364.64 0.00 11,875.00 8,702.82 11,875.00 8,702.82 5,066.00 1,389.07 0.00 11,900.00 8,702.86 11.900.00 8,702.86 5,059.45 1.413.19 0.00 11,925.00 8,702.89 11,925+00 8,702.89 5,051.63 1,436.94 0.00 11,950.00 8,702.67 11,950.00 8,702.67 5,043.01 1,460.40 0.00 11,975.00 8,701.37 11,975.00 8,701.37 5,034.91 1,484.01 0.00 12,000.00 8,698.95 12,000.00 8,698.95 5,027.46 1,507.75 0.00 12,025.00 8,695.40 12,025+00 8,695.40 5,020.68 1,531.55 0.00 12,050.00 8,690.74 12,050.00 8,690.74 5,014.59 1,555.34 0.00 12,075.00 8,684.98 12,075.00 8,684.98 5,009+21 1,579.06 0.00 12,100.00 8,678.52 12,100.00 8,678+52 5,004.74 1,602+79 0.00 12,125.00 8,672.07 12,125.00 8,672.07 5,001.56 1,626.73 0.00 12,150.00 8,665.65 12,150.00 8,665.65 4,999.69 1,650.82 0.00 12,175.00 8,659.28 12,175.00 8,659.28 4,999.11 1,674.98 0.00 12,200.00 8,652s8 12,200.00 8,652+98 4,999.85 1,699.16 0.00 12,225.00 8,646.76 12,225.00 8,646.76 5,001+88 1,723.29 0.00 12,250.00 8,640.64 12,250+00 8,640.64 5,005.22 1,747.29 0.00 12,275.00 8,634.65 12,275.00 8,634.65 5,009.85 1,771.12 0.00 12,300.00 8,628.73 12,300.00 8,628.73 5,014.84 1,794.89 0.00 12,325.00 8,622.84 12,325.00 8,622.84 5,018.57 1,818.89 0.00 12.350.00 8,616.97 12,350.00 8,616.97 5,021.01 1,843.07 0.00 12,375.00 8,611.15 12,375.00 8,611.15 5,022.14 1,867.35 0.00 12,400.00 8,605.40 12,400.00 8,605.40 5,021.97 1,891.68 0.00 12,425.00 8,600.28 12,425.00 8,600.28 5,020.84 1,916.12 0.00 12,450.00 8,596.28 12,450.00 8,596.28 5,019.05 1,940.73 0.00 12,475.00 8,593.41 12,475.00 8,593+41 5.016.61 1,965.44 0.00 12,500.00 8,591.67 12,500.00 8,591.67 5,013.52 1,990.18 0.00 12,525.00 8,591+08 12,525.00 8,591.08 5,009.79 2,014.89 0.00 12,550.00 8,591.19 12,550.00 8,591.19 5,005.13 2,039.45 0.00 121612016 3:45:27PM Page 5 of 7 COMPASS 5000.1 Build 81B BP , �✓� Anticolli ion Report �K R�■ HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 03 Site Error: O.00usft Reference Well: 03-27 Well Error: O.00usft Reference Wellbore 03-27A Reference Design: 03-27A WP05 Plus 500ft MD Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Offset Design PB DS 03 - 03-27 - 03-27A - 03-27A WP05 Survey Program: 100-GYD-CT-CMS, 10175-MWD Reference offset Measured Vertical Measured Vertical Offset WellboreCentre Centre to Depth Depth Depth Depth +N/S +E/-W Centre (usft) (usft) (usft) (usft) (usft) (usft) (usft) 12,575.00 8,591.52 12,575,00 8,591_52 4,999.20 2,063.73 0.00 12,600,00 8,592,09 12,600.00 8,592,09 4,992.04 2,087.68 0.00 12,625.00 8,592.87 12,625.00 8,592.87 4,983.64 2,111.21 0.00 12,650,00 8,593,88 12,650.00 8,593.88 4,974.05 2,134.27 0.00 12,675,00 8,595.11 12,675,00 8,595.11 4,963.29 2,156.80 0.00 12,700.00 8,596,56 12,700.00 8,596.56 4,951,38 2,178,73 0.00 12,725.00 8,598.21 12,725,00 8,598,21 4,938.36 2,200,00 0.00 12,750,00 8,599,98 12,750.00 8,599.98 4,925.30 2,221.25 0,00 12,775.00 8,601.74 12,775.00 8,601.74 4,913,39 2,243.15 0.00 12,800,00 8,603,49 12,800.00 8,603,49 4,902,63 2,265.65 0.00 12,825.00 8,605,23 12,825,00 8,605,23 4,893.07 2,288.68 0.00 12,843.31 8,606,49 12,843.31 8,606,49 4,886,84 2,305.85 0.00 Well 03-27 Mean Sea Level Kelly Bushing / Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum 12/6/2016 3.45:27PM Page 6 of 7 COMPASS 5000.1 Build 81B BP reA.s Vbp Anticollision Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB IDS 03 Site Error: 0.00usft Reference Well: 03-27 Well Error: 0.00usft Reference Wellbore 03-27A Reference Design: 03-27A WP05 Plus 500ft MD Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 03-27 Mean Sea Level Kelly Bushing / Rotary Table @ 62.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to Kelly Bushing / Rotary Table @ Coordinates are relative to: 03-27 Dfset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27 ' OGP-Usa AK central Meridian is 150' 0' 0.000 W ° Grid Convergence at Surface is: 1.62° 12/6/2016 3:45:27PM Page 7 of 7 COMPASS 5000.1 Build 81B ----------------------------------------------- | 1010 | | M % . ■§ � /»� � ' � ._r • � - \ i i!. ■ § � |. 46 a ,y e •� , -,. a |► .. ._ . ,.e ■, w ' 2» . ' |)|) : | ! , § | � ■:,- � | § _ . ■ .\ . � . � . !§4 • � | o 2 • ' ! ! | q o ■AD c z • ,� !� . _v r • x | � •. • : x \ � , ` | w /:_:§ � • • . ] � LLI # x . Q ! c � a o ) z ■ ; / TRANSMITTAL LETTER CHECKLIST WELL NAME: za��Z PTD: /Development _ Service Exploratory _ Stratigraphic Test _ Non -Conventional FIELD:, POOL: 2t� Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole' name ( PH) and API number (50- - - -� from records, data and logs acquired for well (name onpermit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where sam les are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 PTD#: 2161690 Company BP EXPLORATION (ALASKA) INC. Initial Class/Type Well Name: PRUDHOE BAY UNIT 03-27A Program DEV Well bore seg DEV / PEND GeoArea 890 Unit 11650 On/Off Shore On Annular Disposal Administration 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D) NA 1 Permit fee attached NA 2 Lease number appropriate Yes Surf Loc, Top PI & TD lie within ADL0028327; Portion of Well Passes Thru ADL0028328. 3 Unique well name and number Yes 4 Well located in a defined pool Yes PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341F 5 Well located proper distance from drilling unit boundary Yes CO 341 F, Rule 2: There shall be no restrictions as to well spacing except that no pay shall be 6 Well located proper distance from other wells Yes opened in a well closer than 500 feet to the boundary of the affected area. Planned well conforms to CO 7 Sufficient acreage available in drilling unit Yes 341 F, Rule 2. 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Appr Date 11 Permit can be issued without conservation order Yes 12 Permit can be issued without administrative approval Yes SFD 12/22/2016 13 Can permit be approved before 15-day wait Yes 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For NA 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre -produced injector: duration of pre -production less than 3 months (For service well only) NA 18 Conductor string provided NA Conductor set in PBU 03-27 Engineering 19 Surface casing protects all known USDWs NA Surface casing set in PBU 03-27 20 CMT vol adequate to circulate on conductor & surf csg NA Surface casing set and fully cemented 21 CMT vol adequate to tie-in long string to surf csg NA 22 CMT will cover all known productive horizons Yes Productive interval will be completed with slotted liner and perforated 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig has steel tanks; all waste to approved disposal wells 25 If a re -drill, has a 10-403 for abandonment been approved Yes PTD 184-062, Sundry 316-621 26 Adequate wellbore separation proposed Yes Anti -collision analysis complete; no major risk failures 27 If diverter required, does it meet regulations NA Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Max formation pressure is 3234 psig(7.25 ppg EMW); will drill w/ 8.4 ppg VTL 1/6/2017 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MPSP is 2376 psig; will test BOPs to 3500 psig 31 Choke manifold complies w/API RP-53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S measures required 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No DS 03 wells are H2S-bearing. H2S measures are required. Geology 36 Data presented on potential overpressure zones Yes Planned drilling mud program (about 8.4 ppg) appears adequate to control operator's forecast Appr Date 37 Seismic analysis of shallow gas zones NA pore pressure gradient (about 7.25 ppg). Should higher pore pressures be encountered, SFD 12/22/2016 38 Seabed condition survey (if off -shore) NA BP has immediate access to nearby fluid mixing facilities. 39 Contact name/phone for weekly progress reports [exploratory only] NA Geologic Engineering Public Commissioner: Date: Commissioner: Date Commissioner Date ors 1113)12 C;A<,1-t, �l3 l/