Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout218-061Carlisle, Samantha J (DOA) From: Rixse, Melvin G (DOA) Sent: Thursday, June 28, 2018 12:03 PM To: Carlisle, Samantha J (DOA) Subject: FW: PTD 218-061 (lH-104) / 218-062 (1H-1041_1) / 218-063 (1H-104L2) / 218-064 (lH-104L3) / 218-065 (lH-104L4) Sa m, Do I forward this to you? Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-223-3605 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixs�=_�eaiask� . ). From: Brunswick, Scott A [mailto:Scott.A.Brunswick@conocophillips.comj Sent: Thursday, June 28, 2018 11:20 AM To: Rixse, Melvin G (DOA) <melvin.rixse@alaska.gov> Cc: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov>; Lehman, Nick R <Nick.R.Lehman @conocophillips.com>; Rohlfing, Jenaya J<Jenaya.J.Rohlfing@conocophillips.com>; Woodard, Madeline E <Madeline.E.Woodard@conocophillips.com>; Shumway, Kelsey <Kelsey.Shumway@conocophillips.com> Subject: PTD 218-061 (1H-104) / 218-062 (1H-104L1) / 218-063 (1H-104L2) / 218-064 (1H-104L3) / 218-065 (1H-104L4) rim ConocoPhillips would like to rescind the PTD for the following wells with their corresponding approved PTD numbers: 1H-104:218-061 1H-1041_1: 218-062 1H-104L2: 218-063 1 H-104 L3: 218-064 1H-104L4: 218-065 Wet sand were found while drilling the 1H-108 injector, a subsequent pilot hole was drilled that gave further information to move the landing point for the 1H-104 producer. We will be repurposing the 11-1-108 surface casing string to drill the 1H-104 targets at a future time and will send new permit packs to the AOGCC for that project when finalized. Regards Scott Brunswick THE STATE "ALASKA GOVERNOR BILL WALKER G. Alvord Alaska Drilling Manager ConocoPhillips Alaska, Inc. P.O Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Re: Kuparuk River Field, West Sak Oil Pool, KRU 1H-104 ConocoPhillips Alaska, Inc. Permit to Drill Number: 218-061 Surface Location: 5200.56' FNL, 772.31' FEL, SEC. 28, T12N, RI OE, UM Bottomhole Location: 2751.34' FNL, 2120.03' FEL, SEC. 26, T12N, R1OE, UM Dear Mr. Alvord: Enclosed is the approved application for the permit to drill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Hollis S. French Chair A, DATED this 1 � day of June, 2018. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISbION PERMIT TO DRILL 20 AAC 25.005 1 a. Type of Work: 1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1 c. Specify if well is proposed for: Drill [A - Lateral ❑ Stratigraphic Test ❑ Development - Oil El • Service - Winj ❑ Single Zone 0 • Coalbed Gas ❑ Gas Hydrates ❑ Redrill ❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket Single Well ❑ 11. Well Name and Number: ConocoPhillips Bond No. 59-52-180 KRU 1H-104. 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 17,657' TVD: 4 078' • Kuparuk River Field West Sak Oil Pool 4a. Location of Well (Governmental Section): 7. Property Designation: Surface: 5200.56' FNL, 772.31' FEL, Sec 28, T 12N, R010E, UM • ADL025639 & ADL025638 Top of Productive Horizon: 8. DNR Approval Number: 13. Approximate Spud Date: 2330.03' FNL, 32.89' FEL, Sec 33, T 12N, R010E, UM 80-261 & 931695000 7/4/2018 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 2751.34 FNL, 2120.03' FEL, Sec 26, T 12N, R010E, UM 2560 & 2560 2751' to ADL025637 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 93.1' 15. Distance to Nearest Well Open Surface: x- 549568.74 y- 5980782.43 Zone- 4 GL / BF Elevation above MSL (ft): 54.1' Ito Same Pool: 90' to 1 H-01 16. Deviated wells: Kickoff depth: 300 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 95.45 degrees Downhole: 1724 psi Surface: 1339 psi 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42" 20" 94# H-40 Welded 80' Surface Surface 118' 118' Existing, cement to surface 13-1/2" 10-3/4" 45.5# L-80 Hyd 563 1892' Surface Surface 1892' n 1800' 966 sx 11.0 Lead, 201 sx 12.0 Tail 9-7/8" 7-5/8" 29.7# L-80 Hyd 563 6565' Surface Surface 6565' 3855' 871 sx 15.8 Class G 6-3/4" 4-1/2" 12.6# L-80 SLHT/IBTM 11242' 6415' 3820' 17657'- 4078' N/A: Un-cemented slotted liner 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Hydraulic Fracture planned? Yes ❑ No 20. Attachments: Property Plat ❑ BOP Sketch Drilling Program ❑ Time v. Depth Plot ❑ ❑✓ Shallow Hazard Analysis Diverter Sketch Seabed Report Drilling Fluid Program 20 AAC 25.050 requirements❑✓ 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be Madeline Woodard wp deviated from without prior written approval. Contact Name: Authorized Name: G. Alvord Contact Email: madeline.e.woodard co .com Authorized Title: Alaska Drilling Manager Contact Phone: 1-907-265-6086 Authorized Signature: Z _ Date: S 1 Zfl I Commission Use Only Permit to Drill l " API Number: -7 5�E' ' Permit Approval See cover letter for other Number. 50-% L`-�: Date: ` requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: 1J Other: 3.0,P fi� S l f-O try FQ 5 } � � v Samples re d: Yes ❑ No [✓]� Z�"+9zS �asur: Yes � No ❑ Directional Mud log req'd: Yes ❑ No []1'/ Yes [],No ❑ Ail n V � n r p } f Kl � /� svy req'd: a fr F� 7 �-�/� �j/��n4xception req'd: Yes ❑ NoF Inclination -only svy req'd: Yes ❑ No[� C)i `i h Post initial injection MIT req'd: Yes ❑ No Approved by: APPROVED BY ' t� COMMISSIONER THE COMMISSION Date: � �, L {o ��� to rm 10-401 Revised 5/2017 T i permit is vali f f t e�t�of approval per 20 AAC 25.005(g) b�� L Submit Form and Attachments in Duplicate r' Post Office Box 100360 Anchorage, Alaska 99510-0360 Phone (907) 265-6086 Email: madeline.e.woodard(c-)conocophillips.com May 14, 2018 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Application for Permit to Drill, West Sak Producer, 111-104 Dear Commissioner: Application for Permit to Drill, Well 1 H-104 Saved: 17-May-18 i ConocoPhillips Alaska, Inc. hereby applies for a permit to drill a grass roots onshore producer, a penta-lateral horizontal well in the West Sak A2, A3, A4, B and D sands. The expected spud date for this well is July 4, 2018. It is planned to use rig Doyon 142. A 13-1/2" surface hole will be drilled on diverter & 10-3/4" surface casing will be run to total depth and cemented to surface. The remaining intervals will utilize Doyon 142's 13-5/8" x 5000 psi BOP stack with required ram installations and tested on a 14 day cycle in accordance with COP and AOGCC policy. The intermediate hole section will drill a 9- 7/8" hole with 7-5/8" casing run to total depth & cemented in place. The first 1H-104 6-3/4" production lateral will be geo-steered in the West Sak A2 sand and lined with 4-1/2" slotted liner. The subsequent production laterals will again be drilled with 6-3/4" hole and lined with 4-1/2" slotted liner in the following order: West Sak A3, A4, B and D sand. A separate PTD application will be submitted for each lateral: 1H-104, 1H-104L1, 1H-104L2, 1H-104L3, and 1H-104L4 laterals. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: Form 10-401 Application for Permit to Drill per 20 ACC 25.005 (a). Pressure information as required by 20 ACC 25.035 (d) (2). Casing and Cementing program. A drilling fluids program summary. A proposed drilling program. Directional drilling/collision avoidance information as required by 20 ACC 25.050 (b). A proposed completion diagram. Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information, please contact Madeline Woodard at 265-6086 (madeline.e.woodard(&conocophillips.com) or Chip Alvord at 265-6120. Sincerely, Madeline Woodard Drilling Engineer Application for Permit to Drill Document ' Kuparuk Well 1 H-104 Well Name Requirements of 20 AAC 25.005 (f) The well for which this application is submitted will be designated as KRU 1H-104 Location Summary Requirements of 20 AAC 25.005(c)(2) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (2) a plat identifying the property and the property's owners and showing (A)the coordinates of the proposed location of the well at the surface, at the top of each objective formation, and at total depth, referenced to governmental section lines. (B) the coordinates of the proposed location of the well at the surface, referenced to the state plane coordinate system for this state as maintained by the National Geodetic Survey in the National Oceanic and Atmospheric Administration: (C) the proposed depth of the ivell at the top of each objective fortation and at total depth: Location at Surface 5200.56' FNL, 772.31' FEL, Sec 28, T 12N, R010E, UM NGS Coordinates Northings: 5980782.43' • Eastings: 549568.74' IRKB Elevation 93. V AMSL Pad Elevation 54.1' AMSL Location at Surface Casing 175.63' FNL, 1142.53' FEL, Sec 33, T12N, R010E, UM NGS Coordinates Northings: 5980524.96' Eastings: 549200.81 ' Measured Depth, RKB: 1892' Total Vertical Depth, RKB: 1800' Total Vertical Depth, SS: 1707' Location at Intermediate Casing 2519.67' FNL, 4193.45' FEL, Sec 34, T12N, ROIOE, UM NGS Coordinates Northings: 5978196.21 ' Eastings: 551450.33' Measured Depth, RKB: 6565' Total Vertical Depth, RKB: 3855' Total Vertical Depth, SS: 3762' Location at Total Depth 12751.34 FNL, 2120.03' FEL, Sec 26, T 12N, ROIOE, UM NGS Coordinates Northings: 5983297.96' Eastings: 558758.26' Measured Depth, RKB: 17657' Total Vertical Depth, RKB: 4078' Total Vertical Depth, SS: 3985' and (D) other information required by 20 AAC 25.050(b): Requirements of 20 AAC 25.050(b) If a well is to be intentionally deviated, the application for a Permit to Drill (Form 10-401) must (1) include a plat, drawn to a suitable scale, showing the path of the proposed ivellbore, including all adjacent wellbores within 200 feet of any portion of the proposed iv ell: Please see Attachment: Directional Plan And (2) for all wells within 200 feet of the proposed ivellbore (A) list the names of the operators of those wells, to the extent that those names are known or discoverable in public records, and show that each named operator has been fianished a copy of the application by certified mail; or (B) state that the applicant is the only affected owner. The Applicant is the only affected owner. Blowout Prevention Equipment Information Requirements of 20 AAC 25.005(c)(3) An application for a Pernnt to Drill must be accompanied by each of the following items, except far an item already on file with the commission and identified in the application: (3) a diagram and description of the blowout prevention equipment (BOPS) as required by 20 AAC 25.035, 20 AAC 25.036, or 20 AAC 25.037, as applicable; Please reference BOP schematics on file for Doyon 142 & within this PTD application. Due to lower reservoir pressure in the West Sak a fixed stack ram placement will be utilized to fulfill all barrier requirements during well construction operations, graphic attached. Drilling Hazards Information Requirements of 20 AAC 25.005 (c)(4) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (4) information on drilling hazards, including (A) the maximum downhole pressure that may be encountered, criteria used to determine it, and inaxinnmr potential suiface pressure based on a urethane gradient; The maximum potential surface pressure (MPSP) while dr' ing 1H-104 is calculated using an estimated maximum reservoir pressure of 1724 psi (based on JR-05A pressure at a 4005.2' TVD reference datum), ✓ a gas gradient of 0.10 psi/ft, and the estimated depth of the West Sak A2 sand at 3855' TVD: A2 Sand Estimated. BHP = 1,724 psi A2 Sand estimated depth = 3,855' TVD Gas Gradient = 0.10 psi/ft as per 20 AAC 25.005 (c) (4) (A) Hydrostatic of full gas column = 385 psi (3,855' TVD * 0.10 psi/ft) MPSP = BHP — gas column = 1,339 psi (1,724 psi — 385 psi) (B) data on potential gas ones,- The wellbore is not expected to penetrate any shallow gas zones. J -7 And (C) data concerning potential causes of hole problems such as abi7orniall7 geo-pressured su•ata. lost circulation _ones, a21mes that have a propensity for differential sticking: See attached 1H-104 Drilling Hazards Summary Requirements of 20 AAC 25.005 (c)(5) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (5) a description of the procedure for conductingfarmation integrity tests, as required tinder 20 AAC 25.03069r A procedure is on file with the commission for performing FIT/LOT's. The FIT/LOT will be performed on the motherbore of the 1H-104 penta-lateral well (11-1-104). ConocoPhillips requests a waiver on - subsequent laterals FIT/LOT (1H-104L1, 1H-104L2, 1H-104L3, & 1H-104L4). Waiving the upper lateral FIT/LOT may be undertaken if the following criteria are met: 1. Primary cement job pumped as per design with no issues. 2. WellView cement report submitted to AOGCC for review of job before 2nd lateral is drilled (1H-104L1). 3. No abnormal pressure is discovered while drilling the motherbore well (lowest lateral). 4. Kill weight fluid is confirmed using a static flow check at the shoe for 30 minutes post TD of the 1 H-104 motherbore. If any of the above -mentioned criteria are not met, performing an FIT/LOT of the upper laterals will be undertaken. Casing and Cementing Program Requirements of 20 AAC 25.005(c)(6) An application fora Per nut to Drill nmst be accompanied b} each of the following items, except for an item already on file with the commission and identified in the application: (6) a complete proposed casing and cementing program as required by 20 AAC 25.030, and a description of any slotted liner, pre perforated liner, or screen to be installed Casing and Cement Program Hole Csg Weight Grade Coupling Length MD TVD MD TVD Cement Quanti 42" 20" 94# H-40 Welded 80 Surf Surf 80 80 Existing, cement to surface 13.5" 10.75" 45.5# L-80 H563 1892 Surf Surf 1892 1800 966 sx 11.0 Lead, 201 sx 12.0 Tail 9.875" 7.625" 29.7# L-80 H563 6565 Surf Surf 6565 3855 871 sx 15.8 Class G 6.75" 4.5" 12.64 L-80 SLHT/ 11242 6415 3820 17657 4078 Un- IBTM Cemented Liner 11-1-104 Cement Calculations Hole Size ft (TOC) ft (Bottom) OD ID ppf Conductor Depth: 42 39 80 20 19.124 94 Surface Casing Depth: 13.5 39 1892 10.75 9.95 45.5 Intermediate Casing Depth: 9.875 2883 6565 7.625 6.875 29.7 Surface Cement: Surface to 1,850' MD Capacities Lead 1.91 ft3/ sx of 11.0 ppg LiteCRETE ft3/ sx of 12.0 Tail 1.65 DeepCRETE OH 0.177044881 Permafrost (PF) depth 1715 ft 13-1/2" x 10-3/4" 0.064782883 XS% Lead 275 % 20" x 10-3/4" 0.243020085 XS% Tail 50 % 10-3/4" 0.096174956 Tail Cement Length 500 ft 500 x 0.065 x 1.5 48.6 Shoe Track 80 ft 80 x 0.096 x 1 7.7 Open Hole 10 x 0.177 x 1.5 2.7 Total 59 bbl 331 ft3 201 sx Lead Top Tail Cement to Conductor 1273 ft 1273 x 0.065 x 3.75 309.3 bbl Conductor Length 80 ft 80 x 0.243 19.4 bbl Total: 329 bbl 1845 ft3 966 sx Intermediate Cement: Cement from 6,565' MD to 2,883' MD Capacities: Slurry: 15.8ppg Class G yielding 1.16ft^3/sk 9-7/8" x 7-5/8" 0.038250437 XS% for open hole and annulus: 25% 9-7/8" OH 0.094730547 7-5/8" ST 0.045915703 Annulus Cement 3682 x 0.038 x 1.25 176.05 bbls Rathole Cement 2 x 0.095 x 1.25 0.24 bbls Shoe Track 80 x 0.046 x 1 3.67 bbls Total 180 bbls 1010 ft3 871 sx Diverter System Information Requirements of 20 AAC 25.005(c)(7) An application for a Permit to Drill mast be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (7) a diagram and description of the divetter system as required by 20 AAC 25.0351 unless this requirement is waived by the commission under 20 AAC 25.035(h)(2)," Please reference attachment for diverter schematic. Drilling Fluid Program Requirements of 20 AAC 25.005(c)(8) An application for a Permit to Drill must be accompanied by each of the following items. except for an item ah"eady on file with the commission and identified in the application: (8) a drilling fluid program, including a diagram and description of the drilling fluid system, as required by 20 AAC 25.033, Mud Program Summary Surface Intermediate Production 13-1/2" Hole 9-7/8" Hole 6-3/4" Hole 10-3/4" Casing 7-5/8" Casing 4-1/2" Liner Mud System Spud (WBM) LSND (WBM) FloPro (WBM Density 8.8-9.5 9.0-9.4 9.2-9.5 PV ALAP ALAP ALAP YP 30 - 80 20-30 15-30 Funnel Viscosity 250 — 300 Permafrost Base 100-150 to TD N/A N/A Initial Gel 30 - 50 8 -15 5-10 10 minute Gel 30 - 50 < 30 6-15 AN Filtrate NC < 10 < 6 HTHP Fluid Loss at 120 F N/A N/A < 10 H 9.0-10.0 9.0-10.0 9.0-9.5 Diagram of Doyon 142 Mud System is on file with AOGCC. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. Abnormally Pressured Formation Information Requirements of 20 AAC 25.005 (c)(9) N/A - Application is not for an exploratory or stratigraphic test well. Seismic Analysis Requirements of 20 AAC 25.005 (c)(10) N/A - Application is not for an exploratory or stratigraphic test well. Seabed Condition Analysis Requirements of 20 AAC 25.005 (c)(11) N/A - Application is not for an offshore well. Evidence of Bonding Requirements of 20 AAC 25.005 (c)(12) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. Proposed Drilling Program Requirements of 20 AAC 25.005 (c)(13) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file kith the commission and identified in the application: The proposed drilling program follows. Please refer to attachment for proposed well schematic. 1. Move in / rig up Doyon Rig 142. Install 21-1/4" Annular with 16" diverter line and function test. 2. Spud and directionally drill 13-1/2" hole to casing point as per directional plan. Survey & log with MWD, GWD, GR/RES. 3. Run and cement 10-3/4", 45.5#, L80, Hyd-563 casing to surface. Displace cement with mud & check floats upon bumping plug. Perform top job if required after notifying AOGCC. Evacuate top 2 feet of cement from annulus for sealant job (post rig). 4. Remove diverter system, install and test 13-5/8" x 5,000 psi BOP's to 3500 psi (annular preventer to 2500 psi) high and 250 psi low. Notify AOGCC 24 hrs before test. 5. PU 9-7/8" PDC bit and directional drilling assembly, with MWD, Gamma, Resistivity. RIH and clean out to 100' above shoe. Test surface casing to 3,000 psi for 30 minutes. 6. Drill out shoe track and 20' of new formation. Perform FIT to a minimum of 11.5 ppg, maximum of 14 ppg <- EMW LOT/FIT, record results. 7. Directionally drill to intermediate hole TD landing in the West Sak A2 sand package. 8. BROOH to surface shoe, circulate well clean then POOH on elevators. 9. Laydown intermediate BHA. 10. Run 7-5/8", 29.7 L80, Hydril 563 casing from surface to TD. 11. Pump cement job as per Schlumberger proposal. Top cement to be placed @ +/- 2,883' MD (250' TVD minimum above Ugnu C formation). 12. Install 7-5/8" packoff & test to 5000 psi. 13. Flush 10-3/4" x 7-5/8" annulus with water, followed by diesel to freeze protect. 14. PU 6-3/4" bit, and drilling assembly with MWD, Gamma, Resistivity, and Periscope. 15. RIH on 4" DP to top of float equipment. Clean out cement to top of float equipment & test casing to 3,500 psi for 30 minutes, testing against the annular to accommodate the West Sak fixed stack BOP configuration. 16. Drill out shoe track and 20' of new formation. Perform LOT to a minimum of 11.5 ppg EMW maximum FIT of 13.0 ppg, recording results. 17. Directionally drill 6-3/4" hole geo-steering through the West Sak A2 sand to TD per directional plan. 18. Circulate 1 BU after TD and BROOH to 7-5/8" shoe CBU to clean casing & POOH on elevators. 19. Lay down Production BHA. 20. PU and run 4-1/2", 12.6# slotted liner w/ ZXP liner hanger & packer. The top of liner will be placed at -6415' MD, allowing for overlap in the 7-5/8" casing & proper spacing for the whipstock assembly. 21. Set liner hanger & packer using MWD to orient hanger. 22. PT liner top packer to 2,500 psi for 10 minutes, chart results. 23. Flow check well for 30 minutes. 24. POOH with liner running tools and lay down. 25. Run & set Baker whipstock system, placing the KOP for 1H-101L1 at +/-6,664' MD / 3,898' TVD, just below the top of the A3 sand orienting with MWD. 26. Mill 6-3/4" window until top mill across face & clean up window. 27. POOH with milling BHA. 28. PU 6-3/4" bit, motor, MWD, and magnets to perform a clean out run & land the well. (GR, Res) 29. RIH, orient through window and tag bottom. 30. End 1H-104 PTD & begin 1H-104L1 PTD. Discussion of Mud and Cuttings Disposal and Annular Disposal Requirements of 20 AAC 25.005 (c)(14) An application for a Permit to Drill music be accompanied by each of the folloiwutg items, except for an item already on file with the commission and identified in the application: (I 4) a general description of hoar the operator plans to dispose of drilling mud and cuttings and a statement of whether the operator intends to request authori ation under 20 AAC 25.080 for an annular disposal operation in the well.: Waste fluids and cuttings generated during the drilling process will be disposed of by hauling the fluids to a KRU Class II '' disposal well at the 1B Facility. If needed, excess cuttings generated will be hauled to Milne Point or Prudhoe Bay Grind and Inject Facility for temporary storage and eventual processing for injection down an approved disposal well, or stored, tested for hazardous substances, and (if free of hazardous substances) used on pads and roads in the Kuparuk area in accordance with a permit from the State of Alaska. Attachments: Attachment 1 BOP Ram Placement Attachment 2 Well Schematic Attachment 3 Diverter Layout Diaeram Attachment 4 Directional Plan Attachment 5 Drilline Hazards Summary ' III `� ' II I I � � III t 1 III • � t� ' ' 1 t III ' C� q Q t IIII ' ps 1 III , ,...., O III I , � 1 I I ' vim, q ca � III 1 , IIII 1 �M I IIII � 1 III 1 �� ' II 1 M �° ; sO ,', 1 7 � 1 ,I„ I G � IIII I y � I III 1 a � • III ; 1 III 1 • IIII I � , IIII � M � � III � h t` 1 I,I I ; III ; ' IIII 1 IIII 1 - O ' IIII 1 � ; IIII t '� 1 'a' r , III 1 III , ¢ • III 1 1 I 1 V 1 III • ,II ' I • • IIII • v m '-' 1 IIII ' ' III: M .-. ' III 7 I ,', t �� 1 III • t III ' � IIII ; III � �p � III ; 1 I t 1 ' III • III ' ' 1 IIII ' 1 III � ' � IIII ; 1 IIII � 1 IIII ; I,I � III I III � I,I • 1 III t ' ' ' ; III ; IT III • I • I I /� 111 � � III � • IIII ' ' I' I ' ' I I' ' III t ; III • ' IIII • ; "' ' .-7 1 hl /L N W ' III ' ' ; � � IIII � � � ,I, � P-i ; �I� • V a III C 1 III ' 1 III �� IIII 1 O0 1 III • II � ' I ' d O ' III 1 ' III 1� �' IIII 1 IIII �k t s° III 1 _4 I I ' 1 1 • 1 • I I 1 �, III � l� a•' IIII 1 F R III t X FO 1 III �; III; a1 III F'- ,fit IIII t IIII N t ' III 0o I 1, ,II 1 III 1 1 IIII r` W• IIII 1 1 G 1 III 1 � I • 1 � IIII 1 1 1 �l I In I III M I III p]' III @) O 1 t 11 C t C \S1 N > a• vi a`• 1 III 1 I IIII • I 1 > > 50 C 1 10 � ' lit T � T � ' y w M y .a • � a ; III 1 Ih • o y III 1 ; m ' � � ; iiii , Q - X in I N N N N q N Y V] I III ' I in su. v G G y T M R In A C7 C7U v Q" �o � � N x vsOi o � d m U N z o �°iMF -"xp �o� to Yd �003 N ' M OO u > a + 2 h U rn ConocoPhil lips 1H-104 Well Design Revised by Brunswick (Penta Lateral with Slotted Liner) 05/9,78 Alaska 11A3, May 03 2018 1 H-104wp23 - _I i r 1 Base Perm - K-15- UG_ (Na A- WS_A2 - in ]41n G_B \ : \ WS_A3 Permit Pack 0 20" x 42' 3375 7-5/8" x 9-7/8' 10125 13500 easured Depth �oo0 1 Plan: 54.1+39 @ 93.10usft (Doyon 142) v �O O 20" x O00 b a ._ o w I , o a) 10 3/4' n o 4b 0 2500 7-5/8"x 9-7/8� 0 10000 �'� ^0 �1 1 E rn Horizontal Departure ? a • r ����p®tie//' .■...■o�p®-' l 6) I, U 0 1 Equivalent Magnetic Distance 250 560 J1H-108wp?A 750 1000 1250 1500 1750 200 Measured Depth Depth From Depth To Survey/Plan Tool 39.00 900.00 1H-104wp23 (Plan: 1H-104) GYD-GC-SS 900.00 189500 1H-104wp23 (Plan: 1H-104) MWD 900.00 1895:00 1H-104wp23 (Plan: 11-1-104) MWD+IFR-AK-CAZ-SC 1895.00 3395.00 1H-104wp23 (Plan: 1H-104) MWD 1895.00 6565.00 11-1-104wp23 (Plan: 1HA04) MWD+IFR-AK-CAZ-SC 6565.00 8065.00 1H-104wp23 (Plan: 1H-104) MWD 6565.00 17656.89 1H-104wp23 (Plan: 111-104) MWD+IFR-AK-CAZ-SC Pad Elevation: 54.10 10 118.10 20" x 42" 1.001892.22 10 3/4' 006564.82 7-5/8" x 9-7/8" ,.107656.88 4-1/2' x 6-3/4" Plan Summa 4i1 111..• 1 :.1 `dl Ili` Olt"2280 -� 1600 �1= �i����I 0'1•/tiQ'�h ����j1� MOW W7 I it 414 � 13660 4990 1 17657 .• - • 1 ONE - • -• - �- SECTION DETAILS Lithology Column Sec NoInc A ND .NAS +EI-W Db9 TFace vs- Target Ann-t- 1 3900 O.W 0.00 3S.W O.Co O.W 0.00 O.W 000 2 30000 OW 0.00 300.00 O.W 0.00 0.00 O.W O.W KOP: start 1.5'/1W DLS, 242' TF, far3W 3 WO.W 450 242.W 5%.69 -5.53 -10.40 1.50 242oD - Start 2.5'/1 W DLS, O' TF, for WD 4 WO.W 120D 242.W -n -25.n -0"n 2.W 0.W -25.72 Atljust TF to-15'. for 726.76 5 1626.75 29.92 232.69 15]244 -1T227-261.00 250 -1500-172.27 Hold for 115.3T 6 1742.12 2-2 M2.69 1En.44-207.15 -306.77 O.W 0.00-207.15 start25'/1W DLS, 0-TF, for 150.1' 16224 7 1892.22 33.67 232,M 18W.W -255.% �8985 2-0.Do-2S5.08 HOWI.,W 8 1912.22 W,67 232.M 1816.65 IS- -3-47 0.W O.W .261 80 start 2-IIW DLS. 0' V. for 1W Base Perm 9 2012.22 35.67 232.69 1898.89 .2%.28-423.71 2.W 0.00-2%28 S,at4-11WDLS,-S8.37-TF,for 17S3- 10 3796,01 70.11 117.23 W84.13 .1472,W .377.18 4.00 -%.37-1472.88 - for 45245' 1778.2 11 4248.46 7-1 147.23 3238.03.18W.63-146.89 O.W 0.00-1830.63 Sta,t-W DLS,-89%'TF, far 114892 12 5397.38 76.63 %.6o 35.to1 240942 744.W 4.W -89.56-24W.42 iH-1D4 TW WSD OW317 RP Hob for 1167.44' T-3 13 6564.82 76.63 WSo 3855.10-2598.79 1-79 0.W % O.W-25,79 1H-10TooW 84W.a TWSA 0517 RP Atljust TF to 0', for W 14 65.82 76.63 60 3659.73 -2-D4 1SS- 0.00 O.W-2W2.04 shO 4'IIWDIS.904'TF.for335.43' 1992.1 15 6920.25 89.68 101.69 W99.03-2E635D n1a.. 4.W 9.04-266350 HOltl for 150.(W 16 7070.30 as- 101.69 3899.34-2693.% 2357.W O.W oW-2693.90 Sort3.5'11WDLS,-W.51-TF,fo,27681' 17 7347,11 89.W 9200 39W.10 -2n685 2632.04 3.50-W.51-2726.85 1H-104 T0109W17 RP Adj,¢t TFto-98.69',for27859 18 7fi25.70 %.34 82,36 390464 .2713,16 2W9.92 3.50-98.69-2113.16 Hnitl for 79142' 19 8417.12 88.34 82.36 3927.61-2W7.96 3693.% -1) 0.W-2W7.96 Sta,13.11W DLS, 9,173-V,, for 221.99' 20 W39A0 87.80 89.W 3935.10-2591.25 3915.W 3- 90.73.2591.25 --To209o517RP Atljust TF to 99.59', for 55.6 21 86S4.W 8].52 W.64 3937.36 -2-ott 3970.50 3o0 %.59.2591.08 HOltl for 2079.28' 22 1077388 87,52 90.64 4027.20-2614.40 SO47.75 0- 0.00.261440 Sta t2-/1WD1-S.-nU-TF,for45.49 23 1%19.37 87.70 89,75 4029.10-2614.56 W93.19 2.W-78.84-2614.56 1H-161T11011018RP AdjustTFb-71.66-,b,124.W K-15 24 1W43.46 WAS 87.39 403323 -2IS 47 6217.17 2.W-71.66-2611.47 H.Id for 1W.39 25 1185 8848 87.39 403W.49 6326,41 0. 6.13-26W o W -26%49 St.,211W DLS,-91.33' V,, W 2418.58' 26 13471.43 %00 39.W 4115.10-154811 8420.47 2.00 -91.33-1548.71 1-N T12011018 RP Atljust TFto-96.6S-..r347.91' 27 13719.33 87.43 34.07 4124.%-1-:74 8567.89 ].W-%.69-1349.74 H.Id for 1W61' 28 13819.94 87.43 34.07 4129.So-12%A9 %2d.20 O.Do 0.00-126649 start 3'II0Y DLS.-57.79-TF. for/W.43' 29 139W38 W00 3D.00 41MAD-11W.87W.25 W-57.79-1130.56 111-104 T13011018 RP AjuTF O-57.54'. br M7.9,4' 30 42183.822 2233.94125,15 .918.78 W1].W 3.W -57.54 -918,78 r 228 31dd51.93W 97 41W.63 -7W.55 8911.44 0.00 O.W -7W.55 3-DLS,8'TFfer11748 32 14568.579So 4.1.to.59811 8955.77 3W-78.82-598.11 1H-104T14011018 RP Adjust TF b-716,for99- 4045 33 6.29%45 17,.S5 -5IX .24%814 3.W -74..46 5-20fi3414 Holtlbr 34 14922.31 95A5 17.6506E 3526327 S(IS-1 0.00 0.W 27 Stad 3.11W DLS.-105.0Tor 263.W 292].2 35 1518600 9135 10004048to 41.17 9127.67 3W-104 17 0Atljut TF o-1%,07', for 27033 36 15,1W33 9112 2,17 4037.31 2W.19 9156.26 W0.D726o.19 Hbfor 1121.OT UG-C 37 1657].39 91.22 2,17 4013.51 138020 9198.68 0.00 DW 13W.20 Stad 32-1W DLS,-167.53' V.for 38.34' 39 16907.31 So- 359.95 403685 1]%.77 92040.77 3.25 168.2417M 77 1H-104 T16011018 RP W br 1141. �14%24', Ior 291ST 31 UG_B 40 17D2145 W.n 359.95 4055.W 1821,42 9W4.67 D.W OW 182142 Statl 3.25'/1 W MS,03' TF, for 285.4' 41 17W6.85 W.W O.W 4018.10 21W.57 9204.16 3.25 O.W 210557 1H-10aT17011918RP AdjustVt. W.I.,11.R 328 pG A 42 17318.63 W.W 0.38 4078.10 2117.35 920459 3.25 W.002117.35 H.Id b, 33826 336 - 43 1]fi56.89 W.W 0.38 4-AD 2455.W 9206a O.W 0.00 2455.W 111-104 T18011918 RP TD: 17656.89 MD, 4078. 1'ND Na TCRs required for 1 H-11, 361 1 H-17 & 1 H-20 / = By signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured it's completeness, and all surrounding wells are assigned to the proper position, and I approve the scan and collision avoidance plan as set out in the audit pack.) approve it as the basis for the final well plan and wellsite drawings. I also acknowledge = that Itnlacc nntifipri ntharvvica all tnrnats havp a Inn fapt lataral tnlaranra Prepared by: --- Checked by: ..__...-- - - -- - - - - - - -- ccepted by: '-- .---.-. --.-._..--. Approved by: V. Osara Huy Bui Anh Erik Sterk CD 00 L r Q 0 M (ui/,4sn 0009) buiglJON U) 00 of r 00 (D 0 00 N O �- r p of Q r O r Or OD Q� d3 O H r H O LOO r LO O O r pp � r p d r O � r r Di O r O - y: r r O O O �- - p ■� O r r O O 00 --------------------- i- CD x _N F— p N O r 0 _ r r LAn A r 00 O 0 O 0 � _ r o OOOb o �e r :3 = p r o p O 0 LO O N 0 o LO CA. - -'" H CD d + cn r m � � = W = o 0 O 0 - >cn O r ♦� CC) _ r O f / - v `r'LO r ,� = 0 0 00�, o 0 � 0 � pQ � o 1 0 ~ N�, x O 00 C ( _ M r i a p r a� 3 o 0 O o o 0 O o 0 O 0 0 0 LO o LO LO o LO co �G!/ljsn 0090 (+)ulaoN/(-)ulnoS c? IT .y pOD T 0o ri o o p 0) T T O co 00 o N a M Q O T T O T O T T O p0 T y w d T H O T T O O T O T ^W'O}i p O T .y V O H V T � F a V _ T _ 2 T MM O � � i �� O \rl-W \ 0 T T / 1 O r� O T i 1 � O T 0) / I 2 T c M- N O a T F- C0 X 00 T 010 T O004. p p T O T 1 _ T 4 O T N T H \` c c0 0 oo 0 00� - = T (0 cn ° T o U o O 0 LL. N ----_ 0 o c(na W T ti 2 y=.. 0 0 0 o 3 CC)CD o � m N T c LL p 0- o T CD Lo CD ° ti NI o O ° T - 0 � 0 0 a C Cy) O N O O T O � 't O T CL o _ Ir LZ 1 = 0 a1 o a� o 0 0 0 o o O O O 0 o 0 0 0 o O co (ui/}}sn OOOZ) (+)ulaoN/(-)ulnoS c� -- -- £ZdMt�O �-H coL1 59 O m 0 006 N - O OOOL d rn O - o 0 ■� M T— .. O O 0 O U*) O O o `— Q O O O O 00 �' N 0 Q co - N , c 50 0 x O U � � CD_ O N �y Q� o U co40 o `- 006 > M 0 a®000 N co CL- 000£L cl" o LO O 1 o t °O o O - N x Q00 0 � I O O O O O O LO O LO O LO O CO M O Cfl N O 7,-(uilljsn 059) yIdaa leai}aan anal co co 0 0 ti oy o o 0 o OLO ■� EZdMt oO -H r� C m x o N 0 o c CO 4 L99L C ; o i 0 LL o 0 N 0 ,,T LO ° X 0 M O O p O Cal r o o 0 co c. o c 0 0 o o �o o� 0 a0i -5000 CO 000 5° o06 , 4O a� 4000 0 N o CL o oe �{oo 0 � 0 Co o O M CD _ °° 0 0 LO 0 0 0 0 0 0 0 0 0 0 0 (ui/tjsn 009[) utdaa �e�ijjon onal ConocoPhillips (Alaska) Inc. -Kup1 Kuparuk River Unit Kuparuk 1 H Pad Plan: 1 H-104 50029xxxxx00 Plan: 1 H-104 Plan: 1 H-104wp23 Standard Proposal Report 03 May, 2018 ConocoPhillips ConocoPhilli s p Database: OAKEDMP2 Local Co-ordinate Reference Company: ConocoPhillips (Alaska) Inc. -Kupl TVD Reference: Project: Kuparuk River Unit MD Reference: Site: Kuparuk 1 H Pad North Reference: Well: Plan: 1 H-104 Survey Calculation Method: Wellbore: Plan: 1 H-104 Design: 1 H-104wp23 Schlumberger Standard Proposal Report Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) ' Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature Project Kuparuk River Unit, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site Kuparuk 1H Pad Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 usft Slot Radius: Well Plan. 1 H-104 Well Position +N/-S 811.26 usft Northing: +E/-W 376.91 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore Plan: 1 H-104 Magnetics Model Name Sample Date BGGM2017 7/15/2018 Design 1H-104wp23 Audit Notes Latitude: Longitude: 0 " Grid Convergence: Latitude: Longitude: Ground Level: Declination Dip Angle (°) t°) 17.01 80.93 Version: Phase: PLAN Tie On Depth: 39.00 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (I 39.00 0.00 0.00 0.00 0.37 ° 54.10 usft Field Strength (nT) 57,463 51312016 1:09:23PM Page 2 COMPASS 5000.14 Build 85 �►'f ConocoPh i I I i ps Database: OAKEDMP2 Company: ConocoPhillips (Alaska) Inc. -Kup1 Project: Kuparuk River Unit Site: Kuparuk 1 H Pad Well: Plan: 1 H-104 Wellbore: Plan: 1 H-104 Design: 1 H-104wp23 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Schlumberger Standard Proposal Report Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature Plan Survey Tool Program Date 5/3/2018 Depth From Depth To (usft) (usft) Survey (Wellbore) Tool Name Remarks 1 39.00 900.00 1 H-104wp23 (Plan: 1 H-104) GYD-GC-SS Gyrodata gyro single shots 2 900.00 1,895.00 1 H-1 04wp23 (Plan: 1 H-1 04) MWD MWD - Standard 3 900.00 1,895.00 1H-104wp23 (Plan: 1H-104) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 4 1,895,00 3,395.00 1 H-104wp23 (Plan: 1 H-104) MWD MWD - Standard 5 1,895.00 6,565.00 1 H-1 04wp23 (Plan: 1 H-1 04) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 6 6,565.00 8,065.00 1 H-104wp23 (Plan 1 H-104) MWD MWD - Standard 7 6,565.00 17,656.89 1H-104wp23 (Plan: 1H-104) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/3/2018 1:09:23PM Page 3 COMPASS 5000.14 Build 85 ConocoPhilli s p Database: OAKEDMP2 Local Co-ordinate Reference: Company: ConocoPhillips (Alaska) Inc. -Kupl TVD Reference: Project: Kuparuk River Unit MD Reference: Site: Kuparuk 1H Pad North Reference: Well: Plan: 1 H-104 Survey Calculation Method: Wellbore: Plan: 1 H-104 Design: 1 H-104wp23 Plan Sections Schlumberger Standard Proposal Report Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature Measured Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Rate Rate Rate TFO (usft) (°) (°) (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) (^) Target 39.00 0.00 0.00 39.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 600.00 4.50 242.00 599.69 -5.53 -10.40 1.50 1.50 0.00 242.00 900.00 12.00 242.00 896.38 -25.72 -48.38 2.50 2.50 0.00 0.00 1,626.75 29.92 232.69 1,572.44 -172.27 -261.00 2.50 2.47 -1.28 -15.00 1,742.12 29.92 232.69 1,672.44 -207.15 -306.77 0.00 0.00 0.00 0.00 1,892.22 33.67 232.69 1,800.00 -255.08 -369.65 2.50 2.50 0.00 0.00 1,912.22 33.67 232.69 1,816.65 -261.80 -378.47 0.00 0.00 0.00 0.00 2,012.22 35.67 232.69 1,898.89 -296.28 -423.71 2.00 2.00 0.00 0.00 3,796.01 70.11 147.23 3,084.13 -1,472.88 -377.18 4.00 1.93 -4.79 -98.37 4,248.46 70.11 147.23 3,238.03 -1,830.63 -146.89 0.00 0.00 0.00 0.00 5,397.38 76.63 99.60 3,585.10 -2,409.42 744.90 4.00 0.57 -4.15 -89.56 1H-104 T00 WSD 09C 6,564.82 76.63 99.60 3,855.10 -2,598.79 1,864.79 0.00 0.00 0.00 0.00 1 H-104 T00 WSA 09C 6,584.82 76.63 99.60 3,859.73 -2,602.04 1,883.98 0.00 0.00 0.00 0.00 6,920.25 89.88 101.69 3,899.03 -2,663.50 2,210.59 4.00 3.95 0.62 9.04 7,070.30 89.88 101.69 3,899.34 -2,693.90 2,357.53 0.00 0.00 0.00 0.00 7,347.11 89.80 92.00 3.900.10 -2,726.85 2,632.04 3.50 -0.03 -3.50 -90.51 1 H-104 T01 090517 F 7,625.70 88.34 82.36 3,904.64 -2,713.16 2,909.92 3.50 -0.53 -3.46 -98.69 8,417.12 88.34 82.36 3,927.61 -2,607.96 3,693.98 0.00 0.00 0.00 0.00 8,639.10 87.80 89.00 3,935.10 -2,591.25 3,915.09 3.00 -0.24 2.99 94.73 1 H-104 T02 090517 F 8,694.60 87.52 90.64 3,937.36 -2,591.08 3,970.54 3.00 -0.50 2.96 99.59 10,773.88 87.52 90.64 4,027.20 -2,614.40 6,047.75 0.00 0.00 0.00 0.00 10,819.37 87.70 89.75 4,029.10 -2,614.56 6,093.19 2.00 0.39 -1.96 -78.84 1 H-104 T11 011018 R 10,943.46 88.48 87.39 4,033.23 -2,611.47 6,217.17 2.00 0.63 -1.90 -71.66 11,052.85 88.48 87.39 4,036.13 -2,606.49 6,326.41 0.00 0.00 0.00 0.00 13,471.43 88.00 39.00 4.115.10 -1,548.71 8,420.47 2.00 -0.02 -2.00 -91.33 1 H-104 T12 011018 F 13,719.33 87.43 34.07 4,124.99 -1,349.74 8,567.89 2.00 -0.23 -1.99 -96.69 13,819.94 87.43 34.07 4,129.50 -1,266.49 8,624.20 0.00 0.00 0.00 0.00 13,980.38 90.00 30.00 4,133.10 -1,130.56 8,709.25 3.00 1.60 -2.54 -57.79 1H-104 T13 011018 F 14,218.32 93.82 23.97 4,125.15 -918.78 8,817.09 3.00 1.61 -2.54 -57.54 14,451.09 93.82 23.97 4,109.63 -706.55 8,911.44 0.00 0.00 0.00 0.00 14,568.57 94.50 20.50 4,101.10 -598.11 8,955.77 3.00 0.58 -2.95 -78.82 1 H-104 T14 011018 F 14,668.29 95.45 17.65 4,092.45 -504.24 8,988.24 3.00 0.95 -2.86 -71.46 14,922.31 95.45 17.65 4,068.35 -263.27 9,064.91 0.00 0.00 0.00 0.00 15,186.00 93.35 10.00 4,048.10 -8.17 9,127.67 3.00 -0.79 -2.90 -105.04 1 H-104 T15 011018 F 15,456.33 91.22 2.17 4,037.31 260.19 9,156.26 3.00 -0.79 -2.90 -105.07 16,577.39 91.22 2.17 4,013.51 1,380.20 9,198.68 0.00 0.00 0.00 0.00 16,615.74 90.00 1.90 4,013.10 1,418.52 9,200.04 3.25 -3.17 -0.70 -167.53 1 H-104 T16 011018 F 16,907.31 80.72 359.95 4,036.65 1,708.77 9,204.77 3.25 -3.18 -0.67 -168.24 17,021.45 80.72 359.95 4,055.05 1,821.42 9,204.67 0.00 0.00 0.00 0.00 17,306.85 90.00 0.00 4,078.10 2,105.57 9,204.56 3.25 3.25 0.02 0.30 1H-104 T17 011918 F 17,318.63 90.00 0.38 4,078.10 2,117.35 9,204.59 3.25 0.00 3.25 90.00 17,656.89 90.00 0.38 4,078.10 2,455.60 9,206.85 0.00 0.00 0.00 0.00 1 H-104 T18 011918 F 51312018 1:09:23PM Page 4 COMPASS 5000.14 Build 85 ConocoPhilli s p Database: OAKEDMP2 Local Co-ordinate Reference: Company: ConocoPhillips (Alaska) Inc. -Kupl TVD Reference: Project: Kuparuk River Unit MD Reference: Site: Kuparuk I Pad North Reference: Well: Plan: 1 H-104 Survey Calculation Method: Wellbore: Plan: 1 H-104 Design: 1 H-104wp23 Schlumberger Standard Proposal Report Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Section Rate Rate Rate (usft) (°) (°) (usft) (usft) (usft) (usft) (°1100usft) (`/100usft) (°1100usft) 39.00 0.00 0.00 39.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 118.10 0.00 0.00 118.10 0.00 0.00 0.00 0.00 0.00 0.00 20" x 42" 200.00 0.00 0.00 200.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 . 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 KOP: Start 1.5°/100' DLS, 242° TF, for 300' 400.00 1.50 242.00 399.99 -0.61 -1.16 -0.61 1.50 1.50 0.00 500.00 3.00 242.00 499.91 -2.46 -4.62 -2.46 1.50 1.50 0.00 600.00 4.50 242.00 599.69 -5.53 -10.40 -5.53 1.50 1.50 0.00 Start 2.5°/100' DLS, 0° TF, for 300' 700.00 7.00 242.00 699.18 -10.23 -19.24 -10.23 2.50 2.50 0.00 800.00 9.50 242.00 798.14 -16.97 -31.91 -16.97 2.50 2.50 0.00 900.00 12.00 242.00 896.38 -25.72 -48.38 -25.72 2.50 2.50 0.00 Adjust TF to -15°, for 726.76' 1,000.00 14.43 239.40 993.72 -36.95 -68.28 -36.95 2.50 2.43 -2.60 1,100.00 16.88 237.54 1,090.01 -51.08 -91.26 -51.08 2.50 2.45 -1.86 1,200.00 19.34 236.15 1,185.04 -68.10 -117.27 -68.10 2.50 2.46 -1.40 1,300.00 21.81 235.05 1,278.66 -87.97 -146.25 -87.97 2.50 2.47 -1.09 1,400.00 24.29 234.17 1,370.67 -110.65 -178.16 -110.65 2.50 2.48 -0.88 1,500.00 26.77 233.45 1,460.90 -136.11 -212.93 -136.11 2.50 2.48 -0.73 1,600.00 29.25 232.84 1,549.18 -164.28 -250.49 -164.28 2.50 2.48 -0.61 1,626.75 29.92 232.69 1,572.44 -172.27 -261.00 -172.27 2.50 2.49 -0.55 Hold for 116.37' 1,700.00 29.92 232.69 1,635.93 -194.42 -290.06 -194.42 0.00 0.00 0.00 1,715.19 29.92 232.69 1,649.10 -199.01 -296.09 -199.01 0.00 0.00 0.00 PFROST 1,742.12 29.92 232.69 1,672.44 -207.15 -306.77 -207.15 0.00 0.00 0.00 Start 2.5°/100' DLS, 0° TF, for 150.1' 1,800.00 31.36 232.69 1,722.24 -225.03 -330.23 -225.03 2.50 2.50 0.00 1,892.22 33.67 232.69 1,800.00 -255.08 -369.65 -255.08 2.50 2.50 0.00 Hold for 20' - 10 3/4" 1,900.00 33.67 232.69 1,806.47 -257.69 -373.08 -257.69 0.00 0.00 0.00 1,912.22 33.67 232.69 1,816.65 -261.80 -378.47 -261.80 0.00 0.00 0.00 Start 2°/100' DLS, 0° TF, for 100' 1,916.38 33.75 232.69 1,820.10 -263.20 -380.30 -263.20 2.00 2.00 0.00 T-3 2,000.00 35.42 232.69 1,888.94 -291.97 -418.06 -291.97 2.00 2.00 0.00 2,012.22 35.67 232.69 1,898.89 -296.28 -423.71 -296.28 2.00 2.00 0.00 Start 4°/100' DLS,-98.37° TF, for 1783.79' 2,100.00 35.31 226.67 1,970.38 -329.21 -462.53 -329.21 4.00 -0.41 -6.86 2,158.44 35.23 222.62 2,018.10 -353.20 -486.23 -353.20 4.00 -0.13 -6.92 K-16 2,200.00 35.26 219.74 2,052.04 -371.25 -502.02 -371.25 4.00 0.07 -6.93 2,300.00 35.61 212.87 2,133.55 -417.92 -536.29 -417.92 4.00 0.35 -6.88 2,400.00 36.34 206.17 2,214.51 -468.98 -565.17 -468.98 4.00 0.73 -6.70 2,500.00 37.43 199.75 2,294.52 -524.20 -588.51 -524.20 4.00 1.09 -6.41 2,600.00 38.85 193.70 2,373.20 -583.30 -606.22 -583.30 4.00 1.42 -6.06 2,700.00 40.56 188.03 2,450.16 -645.99 -618.19 -645.99 4.00 1.71 -5.66 2,800.00 42.53 182.78 2,525.02 -711.97 -624.38 -711.97 4.00 1.97 -5.25 2,900.00 44.72 177.93 2,597.42 -780.91 -624.75 -780.91 4.00 2.19 -4.85 3,000.00 47.10 173.45 2,667.02 -852.48 -619.29 -852.48 4.00 2.38 -4.48 3,100.00 49.64 169.31 2,733.46 -926.34 -608.05 -926.34 4.00 2.54 -4.13 51312018 1:09:23PM Page 5 COMPASS 5000.14 Build 85 Schlumberger Conocophillips Standard Proposal Report Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: 1H-104 Company: ConocoPhillips (Alaska) Inc. -Kupl TVD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Project: Kuparuk River Unit MD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Site: Kuparuk 1H Pad North Reference: True Well: Plan: 1 H-104 Survey Calculation Method: Minimum Curvature Wellbore: Plan: 1 H-104 Design: 1 H-104wp23 Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Section Rate Rate Rate (usft) (°) (I (usft) (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) 3,200.00 52.32 165.49 2,796.43 -1,002.12 -591.06 -1,002.12 4.00 2.68 -3.83 3,300.00 55.11 161.93 2,855.62 -1,079.45 -568.42 -1,079.45 4.00 2.79 -3.55 3,381.94 57.47 159.20 2,901.10 -1,143.70 -545.73 -1,143.70 4.00 2.88 -3.34 UG-C 3,400.00 58.00 158.62 2,910.74 -1,157.95 -540.23 -1,157.95 4.00 2.92 -3.23 3,500.00 60.97 155.51 2,961.52 -1,237.25 -506.63 -1,237.25 4.00 2.97 -3.11 3,600.00 64.01 152.57 3,007.72 -1,316.96 -467.79 -1,316.96 4.00 3.04 -2.94 3,700.00 67.10 149.79 3,049.11 -1,396.68 -423.89 -1,396.68 4.00 3.09 -2.79 3,796.01 70.11 147.23 3,084.13 -1,472.88 -377.18 -1,472.88 4.00 3.14 -2.66 Hold for 452.46' 3,800.00 70.11 147.23 3,085.49 -1,476.04 -375.15 -1,476.04 0.00 0.00 0.00 3,900.00 70.11 147.23 3,119.50 -1,555.11 -324.25 -1,555.11 0.00 0.00 0.00 3,942.92 70.11 147.23 3,134.10 -1,589.04 -302.41 -1,589.04 0.00 0.00 0.00 UG_B 4,000.00 70.11 147.23 3,153.52 -1,634.18 -273.35 -1,634.18 0.00 0.00 0.00 4,100.00 70.11 147.23 3,187.53 -1,713.25 -222.45 -1,713.25 0.00 0.00 0.00 4,200.00 70.11 147.23 3,221.55 -1,792.32 -171.55 -1,792.32 0.00 0.00 0.00 4,239.85 70.11 147.23 3,235.10 -1,823.83 -151.27 -1,823.83 0.00 0.00 0.00 UG_A 4,248.46 70.11 147.23 3,238.03 -1,830.63 -146.89 -1,830.63 0.00 0.00 0.00 Start 4'/100' DLS,-89.56° TF, for 1148.92' 4,300.00 70.14 145.04 3,255.55 -1,870.88 -119.88 -1,870.88 4.00 0.06 -4.25 4,400.00 70.28 140.79 3,289.42 -1,945.92 -63.15 -1,945.92 4.00 0.13 -4.25 4,500.00 70.51 136.55 3,322.99 -2,016.63 -0.96 -2,016.63 4.00 0.23 -4.24 4,536.38 70.62 135.01 3,335.10 -2,041.22 22.97 -2,041.22 4.00 0.30 -4.23 Na 4,600.00 70.84 132.33 3,356.10 -2,082.68 66.41 -2,082.68 4.00 0.35 -4.22 4,700.00 71.27 128.12 3,388.58 -2,143.74 138.61 -2,143.74 4.00 0.43 -4.21 4,800.00 71.79 123.94 3,420.28 -2,199.51 215.29 -2,199.51 4.00 0.52 -4.18 4,900.00 72.40 119.78 3,451.04 -2,249.72 296.10 -2,249.72 4.00 0.61 -4.15 5,000.00 73.10 115.66 3,480.71 -2,294.13 380.61 -2,294.13 4.00 0.70 -4.12 5,100.00 73.87 111.57 3,509.14 -2,332.51 468.44 -2,332.51 4.00 0.78 -4.09 5,200.00 74.73 107.51 3,536.21 -2.364.70 559.15 -2,364.70 4.00 0.86 -4.06 5,300.00 75.66 103.48 3,561.77 -2,390.51 652.29 -2,390.51 4.00 0.93 -4.02 5,397.38 76.63 99.60 3,585.10 -2,409.42 744.90 -2,409.42 4.00 0.99 -3.99 Hold for 1167.44' - WS D 5,400.00 76.63 99.60 3,585.71 -2,409.84 747.42 -2,409.84 0.00 0.00 0.00 5,500.00 76.63 99.60 3,608.83 -2,426.06 843.35 -2,426.06 0.00 0.00 0.00 5,600.00 76.63 99.60 3,631.96 -2.442.29 939.28 -2,442.29 0.00 0.00 0.00 5,648.16 76.63 99.60 3,643.10 -2,450.10 985.47 -2,450.10 0.00 0.00 0.00 WS_C 5,700.00 76.63 99.60 3,655.09 -2,458.51 1,035.20 -2,458.51 0.00 0.00 0.00 5,751.93 76.63 99.60 3,667.10 -2,466.93 1,085.02 -2,466.93 0.00 0.00 0.00 WS_B 5,800.00 76.63 99.60 3,678.22 -2,474.73 1,131.13 -2,474.73 0.00 0.00 0.00 5,900.00 76.63 99.60 3,701.34 -2,490.95 1,227.06 -2,490.95 0.00 0.00 0.00 5,916.24 76.63 99.60 3,705.10 -2,493.58 1,242.63 -2,493.58 0.00 0.00 0.00 WS_A4 6,000.00 76.63 99.60 3,724.47 -2,507.17 1,322.98 -2,507.17 0.00 0.00 0.00 6,100.00 76.63 99.60 3,747.60 -2,523.39 1,418.91 -2,523.39 0.00 0.00 0.00 6,110.81 76.63 99.60 3,750.10 -2,525.15 1,429.28 -2,525.15 0.00 0.00 0.00 WS_A3 6,200.00 76.63 99.60 3,770.73 -2,539.61 1,514.84 -2,539.61 0.00 0.00 0.00 51312018 1:09:23PM Page 6 COMPASS 5000.14 Build 85 ConocoPh i l l i s p Schlumberger Standard Proposal Report Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: 1 H-104 Company: ConocoPhillips (Alaska) Inc. -Kupl TVD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Project: Kuparuk River Unit MD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Site: Kuparuk 1 H Pad North Reference: True Well: Plan: 1 H-104 Survey Calculation Method: Minimum Curvature Wellbore: Plan:1H-104 Design: 1H-104wp23 Planned Survey Measured Vertical Depth Inclination Azimuth Depth +N/S (usft) (1) (^) (usft) (usft) 6,300.00 76.63 99.60 3,793.85 -2,555.84 6,400.00 76.63 99.60 3,816.98 -2,572.06 6,500.00 76.63 99.60 3,840.11 -2,588.28 6,564.82 76.63 99.60 3,855.10 • -2,598.79 Adjust TF to 0°, for 20' - WS_A2 - 7-5/8" x 9-7/8" 6,584.82 76.63 99.60 3,859.73 -2,602.04 Start 4-/100' DLS, 9.04' TF, for 336.43' 6,600.00 77.23 99.70 3,863.16 -2,604.52 6,700.00 81.18 100.33 3,881.89 -2,621.59 6,800.00 85.13 100.95 3,893.81 -2,639.93 6,900.00 89.08 101.56 3,898.85 -2,659.42 6,920.25 89.88 101.69 3,899.03 -2,663.50 Hold for 160.06' 7,000.00 89.88 101.69 3,899.19 -2,679.66 7,070.30 89.88 101.69 3,899.34 -2,693.90 Start 3.5°1100' DLS,-90.51° TF, for 276.81' 7,100.00 89.88 100.65 3,899.40 -2,699.65 7,200.00 89.84 97.15 3,899.64 -2,715.12 7,300.00 89.81 93.65 3,899.94 -2,724.52 7,347.11 89.80 92.00 3,900.10 -2,726.85 Adjust TF to -98.69°, for 278.69' 7,400.00 89.52 90.17 3,900.41 -2,727.85 7,500.00 88.99 86.71 3,901.71 -2,725.12 7,600.00 88.47 83.25 3,903.92 -2,716.38 7,625.70 88.34 82.36 3,904.64 -2,713.16 Hold for 791.42' 7,700.00 88.34 82.36 3,906.80 -2,703.28 7,800.00 88.34 82.36 3,909.70 -2,689.99 7,900.00 88.34 82.36 3,912.60 -2,676.70 8,000.00 88.34 82.36 3,915.50 -2,663.41 8,100.00 88.34 82.36 3,918.41 -2,650.11 8,200.00 88.34 82.36 3,921.31 -2,636.82 8,300.00 88.34 82.36 3,924.21 -2,623.53 8,400.00 88.34 82.36 3,927.11 -2,610.24 8,417.12 88.34 82.36 3,927.61 -2,607.96 Start 3°/100' DLS, 94.73° TF, for 221.99' 8,500.00 88.13 84.84 3,930.16 -2,598.72 8,600.00 87.89 87.83 3,933.63 -2,592.33 8,639.10 87.80 89.00 3,935.10 -2,591.25 Adjust TF to 99.59°, for 55.5' 8,694.60 87.52 90.64 3,937.36 -2,591.08 Hold for 2079.28' 8,700.00 87.52 90.64 3,937.60 -2,591.14 8,800.00 87.52 90.64 3,941.92 -2,592.26 8,900.00 87.52 90.64 3,946.24 -2,593.38 9,000.00 87.52 90.64 3,950.56 -2,594.51 9,100.00 87.52 90.64 3,954.88 -2,595.63 9,200.00 87.52 90.64 3,959.20 -2,596.75 9,300.00 87.52 90.64 3,963.52 -2,597.87 9,400.00 87.52 90.64 3,967.84 -2,598.99 9,500.00 87.52 90.64 3,972.16 -2,600.11 9,600.00 87.52 90.64 3,976.48 -2,601.24 9,700.00 87.52 90.64 3,980.81 -2,602.36 5/3/2018 1:09:23PM Page 7 Vertical Dogleg Build Turn +E/-W Section Rate Rate Rate (usft) (usft) (°/100usft) (°1100usft) (°1100usft) 1,610.77 -2,555.84 0.00 0.00 0.00 1,706.69 -2,572.06 0.00 0.00 0.00 1,802.62 -2,588.28 0.00 0.00 0.00 1,864.80 -2,598.79 0.00 0.00 0.00 1,883.98 -2,602.04 0.00 0.00 0.00 1,898.56 -2,604.52 4.00 3.95 0.64 1,995.28 -2,621.59 4.00 3.95 0.63 2,092.83 -2,639.93 4.00 3.95 0.62 2,190.77 -2,659.42 4.00 3.95 0.61 2,210.59 -2,663.50 4.00 3.95 0.61 2,288.70 -2,679.66 0.00 0.00 0.00 2,357.53 -2,693.90 0.00 0.00 0.00 2,386.67 -2,699.65 3.50 -0.03 -3.50 2,485.46 -2,715.12 3.50 -0.03 -3.50 2,585.00 -2,724.52 3.50 -0.03 -3.50 2,632.04 -2,726.85 3.50 -0.03 -3.50 2,684.92 -2,727.85 3.50 -0.53 -3.46 2,784.86 -2,725.12 3.50 -0.53 -3.46 2,884.44 -2,716.38 3.50 -0.52 -3.46 2,909.92 -2,713.16 3.50 -0.52 -3.46 2,983.54 -2,703.28 0.00 0.00 0.00 3,082.61 -2,689.99 0.00 0.00 0.00 3,181.68 -2,676.70 0.00 0.00 0.00 3,280.75 -2,663.41 0.00 0.00 0.00 3,379.82 -2,650.11 0.00 0.00 0.00 3,478.89 -2,636.82 0.00 0.00 0.00 3,577.96 -2,623.53 0.00 0.00 0.00 3,677.03 -2,610.24 0.00 0.00 0.00 3,693.98 -2,607.96 0.00 0.00 0.00 3,776.31 -2,598.72 3.00 -0.25 2.99 3,876.03 -2,592.33 3.00 -0.24 2.99 3,915.09 -2,591.25 3.00 -0.24 2.99 3,970.54-2,591.08 3.00 -0.50 2.96 3,975.93 -2,591.14 0.00 0.00 0.00 4,075.83 -2,592.26 0.00 0.00 0.00 4,175.73 -2,593.38 0.00 0.00 0.00 4,275.63 -2,594.51 0.00 0.00 0.00 4,375.53 -2,595.63 0.00 0.00 0.00 4,475.43 -2,596.75 0.00 0.00 0.00 4,575.33 -2,597.87 0.00 0.00 0.00 4,675.23 -2,598.99 0.00 0.00 0.00 4,775.13 -2,600.11 0.00 0.00 0.00 4,875.04 -2,601.24 0.00 0.00 0.00 4,974.94 -2,602.36 0.00 0.00 0.00 COMPASS 5000.14 Build 85 ConocoPs philli Database: OAKEDMP2 Company: ConocoPhillips (Alaska) Inc. -Kup1 Project: Kuparuk River Unit Site: Kuparuk 1 H Pad Well: Plan: 1 H-104 Wellbore: Plan: 11-1-104 Design: 1H-104wp23 Planned Survey Measured Depth Inclination Azimuth (usft) 9,800.00 87.52 90.64 9,900.00 87.52 90.64 10,000.00 87.52 90.64 10,100.00 87.52 90.64 10,200.00 87.52 90.64 10,300.00 87.52 90.64 10,400.00 87.52 90.64 10,500.00 87.52 90.64 10,600.00 87.52 90.64 10,700.00 87.52 90.64 10,773.88 87.52 90.64 Start 2°/100' DLS, -78.84° TF, for 45.49' 10,800.00 87.62 90.13 10,819.37 87.70 89.75 Adjust TF to-71.66°, for 124.09' 10,900.00 88.21 88.22 10,943.46 88.48 87.39 Hold for 109.39' 11,000.00 88.48 87.39 11,052.85 88.48 87.39 Start 2°/100' DLS, -91.33° TF, for 2418.58' 11,100.00 88.46 86.45 11,200.00 88.42 84.45 11,300.00 88.37 82.45 11,400.00 88.33 80.45 11,500.00 88.29 78.45 11,600.00 88.26 76.45 11,700.00 88.22 74.45 11,800.00 88.19 72.45 11,900.00 88.16 70.45 12,000.00 88.13 68.45 12,100.00 88.11 66.44 12.200.00 88.09 64.44 12,300.00 88.06 62.44 12,400.00 88.05 60.44 12,500.00 88.03 58.44 12,600.00 88.02 56.44 12,700.00 88.00 54.44 12,800.00 88.00 52.44 12,900.00 87.99 50.44 13,000.00 87.99 48.43 13,100.00 87.98 46.43 13,200.00 87.99 44.43 13,300.00 87.99 42.43 13,400.00 87.99 40.43 13,471.43 88.00 39.00 Adjust TF to-96.69°, for 247.91' 13,500.00 87.93 38.43 13,600.00 87.70 36.44 13,700.00 87.47 34.46 13,719.33 87.43 34.07 Hold for 100.61' 13.800.00 87.43 34.07 Schlumberger Standard Proposal Report Local Co-ordinate Reference: Well Plan: 11-1-104 TVD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) MD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) North Reference: True Survey Calculation Method: Minimum Curvature Vertical Vertical Dogleg Build Turn Depth +N/-S +E/-W Section Rate Rate Rate (usft) (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) 3,985.13 -2,603.48 5,074.84 -2,603.48 0.00 0.00 0.00 3,989.45 -2,604.60 5,174.74 -2,604.60 0.00 0.00 0.00 3,993.77 -2,605.72 5,274.64 -2,605.72 0.00 0.00 0.00 3,998.09 -2,606.84 5,374.54 -2,606.84 0.00 0.00 0.00 4,002.41 -2,607.97 5,474.44 -2,607.97 0.00 0.00 0.00 4,006.73 -2,609.09 5,574.34 -2,609.09 0.00 0.00 0.00 4,011.05 -2,610.21 5,674.24 -2,610.21 0.00 0.00 0.00 4,015.37 -2,611.33 5,774.14 -2,611.33 0.00 0.00 0.00 4,019.69 -2,612.45 5,874.04 -2,612.45 0.00 0.00 0.00 4,024.01 -2,613.57 5,973.94 -2,613.57 0.00 0.00 0.00 4,027.20 -2,614.40 6,047.75 -2,614.40 0.00 0.00 0.00 4,028.31 -2,614.58 6,073.84 -2,614.58 2.00 0.39 -1.96 4,029.10 -2,614.56 6,093.19 -2,614.56 2.00 0.39 -1.96 4,031.98 0.63 4,033.23 0.63 4,034.73 0.00 4,036.13 0.00 4,037.39 -0.05 4,040.11 -0.04 4,042.91 -0.04 4,045.79 -0.04 4,048.73 -0.04 4,051.74 -0.04 4,054.81 -0.03 4,057.93 -0.03 4,061.11 -0.03 4,064.35 -0.03 4,067.63 -0.03 4,070.95 -0.02 4,074.31 -0.02 4,077.70 -0.02 4,081.12 -0.02 4,084.57 -0.01 4,088.05 -0.01 4,091.54 -0.01 4,095.04 -0.01 4,098.55 0.00 4,102.07 0.00 4,105.58 0.00 4,109.10 0.00 4,112.60 0.01 4,115.10 0.01 4,116.11 -0.23 4,119.92 -0.23 4,124.13 -0.23 4,124.99 -0.23 4,128.61 -1,282.99 8,613.03 -1,282.99 0.00 0.00 -2,613.13 -2, 611.47 -2,608.90 -2,606.49 -2, 603.96 -2,596.03 -2, 584.63 -2,569.77 -2, 551.47 -2,529.75 -2,504.64 -2,476.16 -2,444.36 -2,409.27 -2,370.94 -2,329.40 -2,284.72 -2,236.95 -2,186.14 -2,132.35 -2,075.66 -2, 016.13 -1,953.83 -1,888.85 -1, 821.25 -1,751.12 -1, 678.55 -1,603.62 -1,548.71 -1, 526.43 -1,447.09 -1, 365.71 -1, 349.74 6,173.76-2,613.13 6,217.17-2,611.47 6,273.63-2,608.90 6,326.41-2,606.49 6,373.47-2,603.96 6,473.11-2,596.03 6,572.42-2,584.63 6,671.26-2,569.77 6,769.52-2,551.47 6,867.08-2,529.75 6,963.82-2,504.64 7,059.63-2,476.16 7,154.38-2,444.36 7,247.96-2,409.27 7,340.26-2,370.94 7,431.16-2,329.40 7,520.55-2,284.72 7,608.33-2,236.95 7,694.38-2,186.14 7,778.61-2,132.35 7,860.91-2,075.66 7,941.18-2,016.13 8,019.32-1,953.83 8,095.23-1,888.85 8,168.83-1,821.25 8,240.03-1,751.12 8,308.73-1,678.55 8,374.86-1,603.62 8,420.47-1,548.71 8,438.33 -1,526.43 8,499.07 -1,447.09 8,557.02 -1,365.71 8,567.89 -1,349.74 2.00 2.00 0.00 0.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 -1.90 -1.90 0.00 0.00 -2 00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -1.99 -1.99 -1.99 -1.99 0.00 5/3/2018 1:09:23PM Page 8 COMPASS 5000.14 Build 85 ConocoPh i l l i s p Database: OAKEDMP2 Local Co-ordinate Reference: Company: ConocoPhillips (Alaska) Inc. -Kupl TVD Reference: Project: Kuparuk River Unit MD Reference: Site: Kuparuk 1H Pad North Reference: Well: Plan: 1 H-104 Survey Calculation Method: Wellbore: Plan: 1H-104 Design: 1 H-104wp23 Schlumberger Standard Proposal Report Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Section Rate Rate Rate (usft) V) (1) (usft) (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) 13,819.94 87.43 34.07 4,129.50 -1,266.49 8,624.20 -1,266.49 0.00 0.00 0.00 Start 3°/100' DLS,-57.79° TF, for 160.43' 13,900.00 88.71 32.04 4,132.20 -1,199.43 8,667.83 -1,199.43 3.00 1.60 -2.54 13,980.38 90.00 30.00 4,133.10 -1,130.56 8,709.25 -1,130.56 3.00 1.60 -2.54 Adjust TF to-57.64°, for 237.94' 14,000.00 90.32 29.50 4,133.05 -1,113.52 8,718.99 -1,113.52 3.00 1.61 -2.53 14,100.00 91.93 26.97 4,131.09 -1,025.45 8,766.28 -1,025.45 3.00 1.61 -2.53 14,200.00 93.53 24.43 4,126.33 -935.46 8,809.60 -935.46 3.00 1.61 -2.54 14,218.32 93.82 23.97 4,125.15 -918.78 8,817.09 -918.78 3.00 1.60 -2.54 Hold for 232.78' 14,300.00 93.82 23.97 4,119.71 -844.31 8,850.20 -844.31 0.00 0.00 0.00 14,400.00 93.82 23.97 4,113.04 -753.14 8,890.73 -753.14 0.00 0.00 0.00 14,451.09 93.82 23.97 4,109.63 -706.55 8,911.44 -706.55 0.00 0.00 0.00 Start 3°/100' DLS,-78.82' TF, for 117.48' 14,500.00 94.11 22.52 4,106.25 -661.73 8,930.70 -661.73 3.00 0.58 -2.95 14,568.57 94.50 20.50 4,101.10 -598.11 8,955.77 -598.11 3.00 0.57 -2.95 Adjust TF to-71.46°, for 99.72' 14,600.00 94.80 19.60 4,098.55 -568.69 8,966.51 -568.69 3.00 0.95 -2.85 14,668.29 95.45 17.65 4,092.45 -504.24 8,988.24 -504.24 3.00 0.95 -2.86 Hold for 264.02' 14,700.00 95.45 17.65 4,089.45 -474.16 8,997.81 -474.16 0.00 0.00 0.00 14,800.00 95.45 17.65 4,079.96 -379.30 9,027.99 -379.30 0.00 0.00 0.00 14,900.00 95.45 17.65 4,070.47 -284.43 9,058.18 -284.43 0.00 0.00 0.00 14,922.31 95.45 17.65 4,068.35 -263.27 9,064.91 -263.27 0.00 0.00 0.00 Start 3°/100' DLS,-106.04° TF, for 263.69' 15,000.00 94.84 15.39 4,061.39 -189.09 9,086.92 -189.09 3.00 -0.78 -2.91 15,100.00 94.04 12.49 4,053.64 -92.34 9,110.93 -92.34 3.00 -0.79 -2.90 15,186.00 93.35 10.00 4,048.10 -8.17 9,127.67 -8.17 3.00 -0.80 -2.90 Adjust TF to-106.07°, for 270.33' 15,200.00 93.24 9.59 4,047.30 5.60 9,130.05 5.60 3.00 -0.78 -2.90 15,300.00 92.46 6.69 4,042.33 104.46 9,144.19 104.46 3.00 -0.78 -2.90 15,400.00 91.66 3.80 4,038.73 203.96 9,153.33 203.96 3.00 -0.79 -2.90 15,456.33 91.22 2.17 4,037.31 260.19 9,156.26 260.19 3.00 -0.79 -2.89 Hold for 1121.07' 15,500.00 91.22 2.17 4,036.39 303.83 9,157.91 303.83 0.00 0.00 0.00 15,600.00 91.22 2.17 4,034.26 403.73 9,161.70 403.73 0.00 0.00 0.00 15,700.00 91.22 2.17 4,032.14 503.64 9,165.48 503.64 0.00 0.00 0.00 15,800.00 91.22 2.17 4,030.02 603.54 9,169.27 603.54 0.00 0.00 0.00 15,900.00 91.22 2.17 4,027.89 703.45 9,173.05 703.45 0.00 0.00 0.00 16,000.00 91.22 2.17 4,025.77 803.35 9,176.83 803.35 0.00 0.00 0.00 16,100.00 91.22 2.17 4,023.64 903.26 9,180.62 903.26 0.00 0.00 0.00 16.200.00 91.22 2.17 4,021.52 1,003.17 9,184.40 1,003.17 0.00 0.00 0.00 16,300.00 91.22 2.17 4,019.40 1,103.07 9,188.19 1,103.07 0.00 0.00 0.00 16,400.00 91.22 2.17 4,017.27 1,202.98 9,191.97 1,202.98 0.00 0.00 0.00 16,500.00 91.22 2.17 4,015.15 1,302.88 9,195.75 1,302.88 0.00 0.00 0.00 16,577.39 91.22 2.17 4,013.51 1,380.20 9,198.68 1,380.20 0.00 0.00 0.00 Start 3.26*1100' DLS,-167.63' TF, for 38.34' 16,600.00 90.50 2.01 4,013.17 1,402.79 9,199.51 1,402.79 3.25 -3.17 -0.70 16,615.74 90.00 1.90 4,013.10 1,418.52 9,200.04 1,418.52 3.25 -3.17 -0.70 Adjust TF to-168.24°, for 291.67' 16,700.00 87.32 1.34 4,015.07 1,502.72 9,202.43 1,502.72 3.25 -3.18 -0.66 16,800.00 84.14 0.68 4,022.52 1.602.41 9,204.18 1,602.41 3.25 -3.18 -0.67 51312018 1:09:23PM Page 9 COMPASS 5000.14 Build 85 ConocoPhilli s p Schlumberger Standard Proposal Report Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: 1 H-104 Company: ConocoPhillips (Alaska) Inc. -Kup1 TVD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Project: Kuparuk River Unit MD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Site: Kuparuk 1 H Pad North Reference: True Well: Plan: 1 H-104 Survey Calculation Method: Minimum Curvature Wellbore: Plan: 1 H-104 Design: 1 H-104wp23 Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Section Rate Rate Rate (usft) V) (_) (usft) (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) 16,900.00 80.96 0.00 4,035.49 1,701.55 9,204.77 1,701.55 3.25 -3.18 -0.67 16,907.31 80.72 359.95 4,036.65 1,708.77 9,204.77 1,708.77 3.25 -3.18 -0.68 Hold for 114.14' 17,000.00 80.72 359.95 4,051.59 1,800.25 9,204.69 1,800.25 0.00 0.00 0.00 17,021.45 80.72 359.95 4,055.05 1,821.42 9,204.67 1,821.42 0.00 0.00 0.00 Start 3.25°/100' DLS, 0.3° TF, for 285.4' 17,100.00 83.28 359.97 4,065.98 1,899.20 9,204.62 1,899.20 3.25 3.25 0.02 17,200.00 86.53 359.98 4,074.86 1,998.79 9,204.57 1,998.79 3.25 3.25 0.02 17,300.00 89.78 360.00 4,078.09 2,098.72 9,204.56 2,098.72 3.25 3.25 0.02 17,306.85 90.00 0.00 4,078.10 2,105.57 9,204.56 2,105.57 3.25 3.25 0.02 Adjust TF to 90°, for 11.77' 17,318.63 90.00 0.38 4,078.10 2,117.35 9,204.59 2,117.35 3.25 0.00 3.25 Hold for 338.26' 17,400.00 90.00 0.38 4,078.10 2,198.72 9,205.14 2,198.72 0.00 0.00 0.00 17,500.00 90.00 0.38 4,078.10 2,298.72 9,205.81 2,298.72 0.00 0.00 0.00 17,600.00 90.00 0.38 4,078.10 2,398.72 9,206.47 2,398.72 0.00 0.00 0.00 17,656.89 - 90.00 0.38 4,078.10 . 2,455.60 9,206.85 2,455.60 0.00 0.00 0.00 TD: 17656.89' MD, 4078.1' TVD - 4-1/2" x 6-3/4" 5/3/2018 1:09:23PM Page 10 COMPASS 5000.14 Build 85 ConocoPhilli s p Database: OAKEDMP2 Local Co-ordinate Reference: Company: ConocoPhillips (Alaska) Inc. -Kupl TVD Reference: Project: Kuparuk River Unit MD Reference: Site: Kuparuk 1 H Pad North Reference: Well: Plan: 1 H-104 Survey Calculation Method: Wellbore: Plan: 1 H-104 Design: 1 H-104wp23 Design Targets Target Name hittmiss target Dip Angle Dip Dir. TVD +N/-S +E/-W Shape V) V) (usft) (usft) (usft) 1 H-104 T00 WSD 09051 0.00 0.00 3,585.10 -2,409.42 744.90 - plan hits target center - Circle (radius 1,320.00) 1 H-104 T00 WSD 09051 0.00 0.00 3,585.10 -2,409 42 744.90 - plan hits target center - Circle (radius 100.00) 1 H-104 T00 WSA 09051 0.00 0.00 3,855.10 -2,598.79 1,864.79 - plan hits target center - Circle (radius 100.00) 1 H-104 T01 090517 RP 0.00 0.00 3,900.10 -2,726.85 2,632.04 - plan hits target center - Circle (radius 1,320.00) 1 H-104 T01 090517 RP 0.00 0.00 3,900.10 -2,726.85 2,632.04 - plan hits target center - Circle (radius 100.00) 1 H-104 T02 090517 RP 0.00 0.00 3,935.10 -2,591.25 3,915.09 - plan hits target center - Circle (radius 100.00) 1 H-104 T16 011018 RP 0.00 0.00 4,013.10 1,418.52 9,200.04 - plan hits target center -Circle (radius 100.00) 1H-104 T11 011018 RP 0.00 0.00 4,029.10 -2,614.56 6,093.19 plan hits target center Circle (radius 100.00) 1 H-104 T11 011018 RP_ 0.00 0.00 4,029.10 -2,614.56 6,093.19 plan hits target center Circle (radius 1,320.00) 1 H-104 T15 011018 RP 0.00 0.00 4,048.10 -8.17 9,127.67 - plan hits target center - Circle (radius 1,320.00) 11-1-104 T15 011018 RP 0.00 0.00 4,048.10 -8.17 9,127.67 - plan hits target center - Circle (radius 100.00) 1 H-104 T17 011918 RP 0.00 0.00 4,078.10 2,105.57 9,204.56 - plan hits target center - Circle (radius 100.00) 1 H-104 T18 011918 RP 0.00 0.00 4,078.10 2,455.60 9,206.85 - plan hits target center - Circle (radius 100.00) 1 H-104 T18 011918 RP 0.00 0.00 4,078.10 2,455.60 9,206.85 - plan hits target center - Circle (radius 1,320.00) 1H-104 T14 011018 RP 0.00 0.00 4,101.10 -598.11 8,955.77 - plan hits target center - Circle (radius 100.00) 1 H-104 T12 011018 RP 0.00 0.00 4,115.10 -1,548.71 8,420.47 - plan hits target center - Circle (radius 100.00) 1 H-104 T12 011018 RP_ 0.00 0.00 4,115.10 -1,548.71 8,420.47 - plan hits target center - Circle (radius 1,320.00) Schlumberger Standard Proposal Report Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature 51312018 1:09:23PM Page 11 COMPASS 5000.14 Build 85 `'� Schlumberger OM Standard Proposal Report Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: 1H-104 Company: ConocoPhillips (Alaska) Inc. -Kupl TVD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Project: Kuparuk River Unit MD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Site: Kuparuk 1H Pad North Reference: True Well: Plan: 1 H-104 Survey Calculation Method: Minimum Curvature Wellbore: Plan: 1 H-104 Design: 1 H-104wp23 1H-104 T13 011018 RP 0.00 0.00 4,133.10-1,130.56 8,709.25 - plan hits target center - Circle (radius 100.00) Casing Points rmations Measured Vertical Depth Depth (usft) (usft) 118.10 118.10 20" x 42" 1,892.22 1,800.00 10 3/4" 6,564.82 3,855.10 7-5/8" x 9-7/8" 17,656.89 4,078.10 4-1/2" x 6-3/4" Measured Vertical Depth Depth (usft) (usft) 1,715.19 1,649.10 PFROST 1,916.38 1,820.10 T-3 2,158.44 2,018.10 K-15 3,381.94 2,901.10 UG_C 3,942.92 3,134.10 UG_B 4,239.85 3,235.10 UG_A 4,536.38 3,335.10 Na 5,397.38 3,585.10 WS_D 5,648.16 3,643.10 WS_C 5,751.93 3,667.10 WS_B 5,916.24 3,705.10 WS_A4 6,110.81 3,750.10 WS_A3 6,564.82 3,855.10 WS_A2 Name Name Lithology Casing Hole Diameter Diameter 20 42 10-3/4 13-1/2 7-5/8 9-7/8 4-1/2 6-3/4 Dip Dip Direction C) (1) 0.00 0.00 0.00 0.00 0.00 0.00 5/3/2018 1:09:23PM Page 12 COMPASS 5000.14 Build 85 i ConocoPh i l l i s p Database: OAKEDMP2 Local Co-ordinate Reference: Company: ConocoPhillips (Alaska) Inc. -Kupl TVD Reference: Project: Kuparuk River Unit MD Reference: Site: Kuparuk 1H Pad North Reference: Well: Plan: 1H-104 Survey Calculation Method: Wellbore: Plan: 1 H-104 Design: 1 H-104wp23 Schlumberger Standard Proposal Report Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 300.00 300.00 0.00 0.00 KOP: Start 1.5°/100' DLS, 242' TF, for 300' 600.00 599.69 -5.53 -10.40 Start 2.5*/100' DLS, 0° TF, for 300' 900.00 896.38 -25.72 -48.38 Adjust TF to -15°, for 726.75' 1,626.75 1,572.44 -172.27 -261.00 Hold for 115.37' 1,742.12 1,672.44 -207.15 -306.77 Start 2.5°/100' DLS, 0° TF, for 150.1' 1,892.22 1,800.00 -255.08 -369.65 Hold for 20' 1,912.22 1,816.65 -261.80 -378.47 Start 2-/100' DLS, 0° TF, for 100' 2,012.22 1,898.89 -296.28 -423.71 Start 4°/100' DLS,-98.37° TF, for 1783.79' 3,796.01 3,084.13 -1,472.88 -377.18 Hold for 452.45' 4,248.46 3,238.03 -1,830.63 -146.89 Start 4'/100' DLS,-89.56' TF, for 1148.92' 5,397.38 3,585.10 -2,409.42 744.90 Hold for 1167.44' 6,564.82 3,855.10 -2,598.79 1,864.79 Adjust TF to 0°, for 20' 6,584.82 3,859.73 -2,602.04 1,883.98 Start 4'/100' DLS, 9.04' TF, for 335.43' 6,920.25 3,899.03 -2,663.50 2,210.59 Hold for 150.05' 7,070.30 3,899.34 -2,693.90 2,357.53 Start 3.5'/100' DLS, -90.51 ° TF, for 276.81' 7,347.11 3,900.10 -2,726.85 2,632.04 Adjust TF to-98.69°, for 278.59' 7,625.70 3,904.64 -2,713.16 2,909.92 Hold for 791.42' 8,417.12 3,927.61 -2,607.96 3,693.98 Start Y/100' DLS, 94.73' TF, for 221.99' 8,639.10 3,935.10 -2.591.25 3,915.09 Adjust TF to 99.59°, for 55.5' 8,694.60 3,937.36 -2,591.08 3,970.54 Hold for 2079.28' 10,773.88 4,027.20 -2,614.40 6,047.75 Start 2'/100' DLS,-78.84' TF, for 45.49' 10,819.37 4,029.10 -2,614.56 6,093.19 Adjust TF to-71.66°, for 124,09' 10,943.46 4,033.23 -2,611.47 6,217.17 Hold for 109.39' 11,052.85 4,036.13 -2,606.49 6,326.41 Start 2°/100' DLS,-91.33' TF, for 2418.58' 13,471.43 4,115.10 -1,548.71 8,420.47 Adjust TFto-96.69°,for 247.91' 13,719.33 4,124.99 -1,349.74 8,567.89 Hold for 100.61' 13,819.94 4,129.50 -1,266.49 8,624.20 Start Y/100' DLS,-57.79' TF, for 160.43' 13,980.38 4,133.10 -1,130.56 8,709.25 Adjust TF to-57.54°, for 237.94' 14,218.32 4,125.15 -918.78 8,817.09 Hold for 232.78' 14,451.09 4,109.63 -706.55 8,911.44 Start 3°/100' DLS,-78.82' TF, for 117.48' 14,568.57 4,101.10 -598.11 8,955.77 Adjust TF to-71.46°, for 99.72' 14,668.29 4,092.45 -504.24 8,988.24 Hold for 254.02' 14,922.31 4,068.35 -263.27 9,064.91 Start Y/100' DLS,-105.04' TF, for 263.69' 15,186.00 4,048.10 -8.17 9,127.67 Adjust TF to-105.07°, for 270.33' 15,456.33 4,037.31 260.19 9,156.26 Hold for 1121.07' 16,577.39 4,013.51 1,380.20 9,198.68 Start 3.25°/l00' DLS,-167.53' TF, for 38.34' 16,615.74 4,013.10 1,418.52 9,200.04 Adjust TF to-168.24°, for 291.57' 16,907.31 4,036.65 1,708.77 9,204.77 Hold for 114.14' 17,021.45 4,055.05 1,821.42 9,204.67 Start 3.25°/100' DLS, 0.3° TF, for 285.4' 17,306.85 4,078.10 2,105.57 9,204.56 Adjust TF to 90°, for 11.77' 17,318.63 4,078.10 2,117.35 9,204.59 Hold for 338.26' 17,656.89 4,078.10 2,455.60 9,206.85 TD: 17656.89' MD, 4078.1' TVD 5/3/2018 1:09:23PM Page 13 COMPASS 5000.14 Build 85 P Cd ■ N_ C O is C r C N N w fn N w o w o K i r o + w o Z � N x s Q � �c 3 � N «N d N 0 L i � t (6 �- (q o 3 Ci CL o A O C U. N w ■_ � = a w � w ■ o m c10i a m y a a a v cn Ld M00J Q ¢ oo /oVO =TY OTT KiC MLO L�/i�// o N)d:oQm O'A G2 =O•T}� X N L L T T x O }i I Of UJ Gi ci OCa Q. Q. •• O T o w o d c a a o. c c° cT V cC � U ♦ 1 > d v 0 N c m m Y Y a a T v o ��3o�nu,c�>�ncn CL s O O c CO a U � O N N Ul N N N N N N N N N N N N N N L N N L N N N N N R O O O O O O O O .0 O O O O O O O O O O O �(6 O O O O O O O O. (6 f6c0 N (6 (0 (0 2 2 2i 2.2i (Q (0 (0 (Qc0 2i:5 :5 :5 2 (0 (6 (0 (0 (6 :E 2: 2 2E:5 2 N f0 (0 N cQ �(6 2i 2 2E i5 i5 2 (0 2 r r r r r r r r r r r r r r r r r r r r r r r r r r N N N N N N N N N N N N N N N N N N N N N N N N N N cN N N co R co N N N N N R R R (0 N N N N N R R R R N N N N N N N R R R R R (0 N N N N N N (0 R R R m R (o R LL LL a a LL LL n. LL a LL LL a LL a LL LL a. LL LL LL LL LL a a LL LL c 0 a -0 O O O O O OU O O O O O O U U U N O U U U U U O N N O U 0 U 0 U0 N U UmE UM NUC NCR '?C R R m LL LL LL R co RmRw LL LL LL LL m LL LL LL p (Q pC LL LL LL CNU M _LL N LL LL RN N N N 0 N N N N N N (➢ N n N w N m N y N N O N a)CDN C U U U C C U U U U U C C C C C O p U O p C C C p O p O p O C C C p O O 0 U C C C 0 CC G N N N N (6 N N N R N N R N N N N N N N l6 (0 N N N N C C C G C C C U) TC _ C U U U U U U ii U U U U U U U U U c� U U U U U c) U U LO m M LO m m CO r- O M M m LO CO M M CO t` N y m c0 m OJ m V Ln O7 M V f-r (D N M O r O O N OJ N W V V V W N V V O O0 V t0 C O r- CO M N LO M r- LO r- LO r 0 r W V 0 V R R co V M ;I-W ITx V N 'ITM N V N LL U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a d o 0 0 In l0 t!] 0 0 0 0 0 0 O 0 LO m 0 0 0 0 o m O Lo O In O o 0 0 0 0 LO LO In IN In LO 0 0 0 0 0 0 LO LO m LO O LO Cr O y Q .�" W N V N O N n r C m M 00 N r r LO t` W m m N N N N N N -- N N N N N N N O N N � N O a- R d 7 C\ C\ C\l V N N N Cl N M M m LO V V LO V (D N N N I� r m O M O M O c2 O M O m m 00 C (Q r r N LO O0 N N V M (O O O M cl) M clJ O �' O V N N 00 V (O w0 (O m N M r co I� w f� wr co L� M t` O N M LO co N r N O mM Nc- N V V f� L� r n r f� - R W N N O a 00 LO (O O r 0 n O co W OJ OR M O M m M ('l W (O O O O 0 o O o O f- O O o O V [{ 0 It N N (fl O M N LO m m m N LO co m LO LO LO LO m m LO LO LO O LO O N O L 3' LO CO O N LO M r M LO N N r M CO N N N M M N N N N N N N N N N O r O R y �2 T LO M N Co M M M co N Om a �m E 'C M W f- O m N N N r� O V LO V c{ r M N M d O N O m V co 00 M M 0'J m V M O O M OJ I:O r O Ln wIh 0 _'T N N NNE O O c- O r _ M O 0 O r O y 7 U N N N O W CO N N N M c O .� E C y V �M `M �M M Mm er .- N � o Q R 3 a v N r M O M M �q W m N M w (q O O 0 O O O O O O O O N r M OT N (n a L r- N (O O M N m LO LO m N m M LO LO LO LO LO 0 O 0 0 0 l!] Ln LO LO O lO O r 3 - w y O N �_ M ^ U N r-- N O] a0 M M ,-- N N N N N N e- N N N N O N O r- 1 N W Q v Cl) (N LO M N M m M M M co ao 2 R 1 � � O C y T r n'R > r o C al m V CL 7 N (n O 41 U Q L R 7 C LL E R U R al 2 Jq c a 02m 2 v �-+ c v o O 0 jL N tv = y J N N J J M M It V J T J J 00 (V U o O O 04 ii O O V J C?O O O O O N N r- ,�' E O O O S S =2-- 2 /y R 'a U U U N M V O O O O 2 co W m m O O O O 2 r r { 2 2 O O. tZ m Z r r r d a-- ' O S 2 2 S r r J J J J r r r r J J J J r r J O cli O 9 LO ' J J O If ,, o 0 U •- •- _ 0 0 0 0 0 0 0 0 O O O O O O O O O O O O a Z ,y c O U U U o 0 S S S 2 2 S S S S 2 S S S o N N N Y �. �- '. y S S 2 2 2 S S S 2 S � � � � � � .- .-- � � .- c- N E ` ` - �- - r - - - - �- i O O � tU L77 f0 ti r o o O O O C y c v Z O. E CLCL LO N c0 V V o 0 0 0 o V 00 W m m O Cr O o 0 O O O O O O O O aU Y U U U Y S 2 2- 2 S S S S S S S S S S S S S S S S- S Q t` W m 0 zo 'c `m Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y EC Y Y Y Y .Y Y Y Y Y Y Y Y O N N N N N N N N N N N N Mn N N N N N N N N N N N N N N N N N Ir Of ol a� (if af Of x x a� a� 0� Of fr a� Of x LL w x ol 0� 0� 0� x Q� 0� Of Q' N N N N N N N N N N N N N N N N N N N N U) N N N N N N N N N N N N N N M M M M M N N N N N N M M M M M M N N N N N N M M N M N M N N N N N N M M M M M N N N N N N N N N M M N M N M LL a d o_ a d LL LL a n_ a LL a a_ a- o_ a LL a a d a n. LL a LL a. o- a 0- 0 a m O NO NO N O N O NO NO O O O N y O N O O N O N= O ON M t5o m M C (p C (p C O C (p C C (p C (p C (p C (p (p C C (p C C O C (p C 'C LL M LL O LL O LL O LL L M MLLNLL_N LL M LL LL Co M LL _N LL M LL M LL M N N U/ N N N N N N N N N N N N N (D N N N N to N N N N a)N O N M o 'p o p o 'p u p o p o 0 o p O 0 o 0 o o 0 0 o 0 u p o 0 o 0 c c c c c c c c c c c c c c c m v m m v2 m m d m m m 2 M C M C M C M C M C M C M C M C M C M M C C M C M C M C M C (n N O N O N O N O N N N O N O N O N O N N O N U U U U U U U U U U U U U U U 0 U U U U U U U U U U U U U U V N V N V N V' n M N (D n (D O N O O V' V' OD N n N (D O y m V m Itm V' o] a1 (D n co N In l0 t0 M N o m O lD U t (D V' (q V' M V' n n V N O] O Cl? lfl (M (() M m O VJ N o (O m n V O C O (O O m O m O (n O co (D (D O m O M N r- co m (O (D m r (D V U N V' N V' N It N N r N r r r r r r r r r n N M N r 6 M d LL U 0 O o 0 o O O o 0 0 o O o 0 0 0 o O O o 0 o O o 0 0 0 0 0 0 a o o O O O O o 0 o O o 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 o O O d Lo O (n o vi o 0 O In O to 0 (n 0 LO o (n u7 o ui 0 0 0 0 0 o O m L n O r- O r- O n (D m m � (n r-(N n (n F- No r-O O O (O (D (D In r- n n y Q$ N �- N r N N N N N N N V l0 (O M V' V (O M M V lD N N j (O r0 r p) o G N M N W N W N O m V l(] r N N W W M N N M V m M M m O O (fl C (O (D (D (D M N m (D N V M M (") (n N V' N M n Lq O W V O (D n (D n (D ( r m n (O (D (n (o Ln o m O N co ri O m r- o o m (M M LO( LO LO U1 U� (O N N r N N M O V c- M n n M N N r r N N (O _a W a N rn n M n w n co r- m m � (D n co r� M n (D a V V' V V V 7 V O O O O O O O O O O d (O O (n o m O (O O o O (D O (D O m O m O L n O n o n O n (D n (D n (D n m n (O r� N r N r N r N N N N N N (p O N N ( M M co M N M CO (f) m m m N m to to LoG (i M M M O m O m O m O m O m d O O O O O O O O O O O O O y O U N N N N N N N O M O (D M w (D (D o o O £ A y r r r r r r r O C N m a d V CO O M n r O (D M n N m m (O n M V oD m r m r V V' m (D V' O m (D M o m N O N N m N't O m V' V' W V n n n n n n r (D N M w n r- m N V m r N N O (D (O O M(x) O m r M N M m m QD n m m O7 m m N o m co n N N (D N n O n W r- w n n 0 n (D m m r� 0 n (D IT M C. m n O (D m r- r-N m •V V' V' V' V O O O O O O O O O O (D m (O n M V CO (D r r m V' Co (O O m O (D (O O Lo O u-) O ( O 0 O m V' M (D V' O m N (D M O m N O CCI N L n O n o r- O m m �- (D n (O n (n n (O n N m N v O m V V (D V' n n n v va - y 6 y N - N - N r N N N N N N V V V' M M 'V (n M M V n W y p n n v o m L •- * m 0 0 Z � � � c m 7 O c y a r o C rn 7 ? a m N E U N N LL m N Z 0 a 2 m o c `o c a N M M V V 'J7 2 O („) N N N N N O 0 0 O O N N Cl) co O O O O M M M M M M M M E y E S SS S S S S S S S S S S r — r r r r — r r �- 'i (O O O O O O M M M O O 0 o O O M M M M M M O O O O O O m m r r 0 0 M M V V M M O� p CII Z ,y G O �- r r r r S S S S S S S S S S S S S S S S S S S== S S S S S S S S O = d O D W j W A a N N N N N o 0 0 0 N N M Cl) M M O O M M M M M M m m r `' M M O (O Z o o 0 0 0 00 0 O 0 0 0 0 (n ;•� d O SS S S S S S S S S S S S S S S S 2 2 S S S S S S S S S N U - r � - r r .- �� .- r .- r r r r r � r �� .- r r r .- r r r r r r � co CO CO a O U n O cn co CD O N c(6 K O MW tA s �(L V O c W m C y7m` G w � N N An N N (ll U) .0 N 0 N N N N N N N y (/1 N N M y y N y y w N A O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O m w m m W W W W W W W W W .W W W .W .W .W W W W m W W W .W W W W y m N y N N N N N N N y N y N N N N N N y N N N N In N N m N N N w w w w N In 0) y N N w N w N w w N N N N w w U) w w N w w m m m w w w m w w w (0 w w m m m m N w w m w (0 w w m m w m m LL o a a o a a a a LL LL m m m m n m a. a a m o_ a d CL a a. a LL a c 0 a m `o `o `o `o `o o `o `o `0 o `o `o o` 0 `o o` 0 o o i� u u u %u u iv i� i[u u u viU vom�mm m m m m m w w w m m m m m m w m m C mE ` c 2, 'E LL LL LL LL LL LL LL (a LL LL LL LL LL LL LL LL LL w LL m LL _m LL m LL w LL m LL �0 m 0 0 m 0 w a) m m a) 0 0 m m m o m� m N a) N m N m N m N m N m U U U U U U 0 p U u U U U U U U o p U p o p U 0 U � o p o p E c c c c c c c c c c c c c c c c c c c c c C rn m m m m m m A m m m N N m m m m m m m m m m m4) md) m 4) m 4) U U U U U U U U U U U U U U U U U U U U U U U U U 0 U U U U N N V' 't ItN N m a "r V 7 V "t ' r V n m a0 N O O m m 00 u) (O m (O N In co d' V' V (O (O M co co co co co co co (0 m V r- m C) CA w N u) U I: 0 0 0 O (O (O � r r���� r N O C) m N O m N O N M [t C O M M m M m r N N N 0 (O m (O tO (O m r 0 V (O (O w O O O co M N n V („� r N N N r .-- N w w _N LL U 0 0 0 0 0 0 0 a O O O O O O O O O o 0 0 0 0 0 0 0 O o O o 0 a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 v ui 0 0 0 o tri 0 LO 0 0 0 0 0 0 0 0 LO 0 ui LO 0 0 Ln 0 ui LO 0 LO o m L N M u) to t0 N O N u) LO LO u) LO LO (O (O N 0 r r, O O N M N N to r O r y CL �" c0 N u) u] u) O r t` oc oct CI oc oc N oc oc r v <t M V M V N M u) CO N LO N w d w r N N N N N V V r r r r r r r r r N N r r m p � m N O O O O 0 0 O O m O M N 0 (0 M N 0 m m V M w C N O M M M (0 O 07 O O O O O O O O M r C) (0 V (0 n O) M d O N m (0 m (O N m m CI N 40 C) m a0 a0 OD O f� u) MLO r m m (OC) t0 V V wONO w N (O tO tO LO N N (NO 'r w m O r r r r N N N N N N N N N N N N r .-- r r .-- a= w � ti N (O M (0 (D N 'V' m m m M M M M M M f- m LO 0 r O M m m m M r,O m (A m m m m m m m N O u) N M u) t0 M O L- r n ti n (0 N N N N N N N N O N u) r O r O LO LO 0 u) W to L N N N N V to r N N N N N N N N m m r (O r O N to N N (O r m n w CL a m C1 C) C) CCO N N m m (A (A CA m m m (O CO C'N Cl) 7 N M tO LO N V' N d y r N N N N N CO (O r r r r r -- - r N N r v � a 0 0 0 N N O to m O (O O V N 0) N C7 C7 M W M r tO O O O O O O O O M r r n 7 O m M O M N m r m w 7 N N Cl N N N (O r r V 7 V It v ct V V' o3 O r C] O O o r co co m CD Oi U t` M M M M w CO O (D O O c0 O (O (0 w w n n m m u) tO m m N N CO (0 'C E ycw, w (0 N N N N M M N N N N N N N N M M r r r r r M ° w N p Q a 3 �y N N O m (0 C1 N V N M M C0 M M M M M (1 q CO CI � O M O V V O O c O V M N d m m m m m C) fl N m m m m m m m O m N O (O N r r r M tO tf1 r M r O r r n t` n 0 N N N N N N N N O N to L- O � O 0 Lo O 0 m (n C 3 Q. 0 N y C7 oc oc oc oc O N N ONi 0 00 CNI a C ONI ONi W c(C (m0 � N N M V N LO M LO N N V' N ` W C p 7 r N N N N N c0 (O r r r r r r r r N N r r � L � w 7 p c w m 2 a r o m m tt a 7 N M O (p O y S m r d N N N N a0 m E aaaa a fl- aaa 0 C LL w O U w 10 y Z 0] m (O (O n N m 030 O O N c a N C � o Q a 0 0 0 0 0 0 yam—+ o y, m w w m Q -� Q O ("n a w 0) LL _ U Q Q Q 0) _ m m (� m m 0 0 N O m= 2 m o 0 0 0 0 0 Q Q E` W LL x N CO r r t N N N O p,w 0] r m Z _ t LL _ _ _ S t O O C C C C C C C C G J 2 2 2 w w m m w w w w m Om ° ¢ a a Q a¢ a a a a a a a a d a a O t0 O CO m CO C) W O m m m m m m m O N N S S .N O a1 O r t= .-- r r r r r r r r r r .-- r r r r N N N Z Z O 0 r r w M O O N '� O w a 2 M: 2 M x a: x x x 2 2 2 2 2 2 2 2 2 S(D j O O O O O O Oa p rn .r .@ r r r r r r r r r r r r. r r r r. = r r r r C y C a Z a u) (0 0 O ' V E r r r c- r r r r r r r r r r r r N N N ij d x x x x x x x 2 x x 2 2 2 x x x x x 2 2 2 a a CL m m CL a a c c � � � � r r r r r r r r r .- r r r r r r r CO U) U U 11 OOt CT co N N O V E m Y Y Y O y y y R O. O O O 6 6 (6 0 w y w y y w R R R C O a y E m E O N O N C co C LL R LL R y E C ❑ 0 E ca (p aR (D U U U r (0 7 y U r r (o N M O n of h R R LL U 0 0 0 a o 0 0 0 0 0 = CL w 0 Lo V Cl)V y y Q 7 p� V w O O O O M V Cl) y A r O O N N G N = R w CL w U) N O M a r O (D d M 0 (O y Co y R 01 = N � E _ t r Cl)M N N O y = [ { O O E Ry N N CO) E n = 04 ❑ Q R 3 n d i r O (Mo V O M N N a00 a C — y a N � It v LU d y p � r r c a m Ir- R ❑ C y � T R o rn i a s = v n. 3 w (n O N U Q R E _ LL R Q O O 3 3 3 O � C d v C O ` U v > r r �+ CO ` 25 y E 2 2 r Y y m d a n- •V% O m 0 O QI O r C N (n (n •� z 'y O y y O y d v❑ m w m m — c 'a z a T C R R +r U m 2 r OE R R R y C c U (A a. a- a_j Q N U U E CA Q 0 C U 0 U I? �) C9 F N N N m U U U UJ Q Q Q lncoc�� � U LL LL LL Y M M M M M M M N N N N N N N v v v v v v v 0 0 0 0 0 0 0 0 0 0 0 0 0 m 0 0 0 0 0 0 W 0 Lo (o Lo Lo Lo (o F yo m m m (o 0 o W w� M (n o (o r co(o W O O 0 O O O O 0 0 0 0 0 0 0 E F M O O O1 m O M LL V r r Co ( Q) a C U r- 0 IT 11:24, May 03 2018 1 H-1 04wp23 Ladder View N I N E 3 3 d Q d JJQ 3 0 0 ---- — _ _ — —---- — J E 3 a, ' a I � .2 j ) U a 100 — — C U ar � I 0 0 2500 5000 7500 10000 12500 15000 17500 Measured Depth SURVEY PROGRAM CASING DETAILS Depth Froldrepth To Survey/Plan Tool TVD MD Name 39.00 900.00 1 H-104wp23 (Plan: 1 HG'@gGC-SS 118.10118.10 20" x 42" 900.00895.00 1 H-104wp23 (Plan: 1 HMUg 1800.M2.22 10 3/4" 900.00895.00 1H-104wp23 (Plan: 1HM?4�+IFR-AK-CAZ-SC 3855.6664.877-5/8" x 9-7/8" 1895.03395.00 1 H-104wp23 (Plan: 1 HMgg 4078.71656.884-1 /2" x 6-3/4" 1895.06565.00 1 H-104wp23 (Plan: 1 HMVA?+IFR-AK-CAZ-SC 6565.03065.00 1 H-104wp23 (Plan: 1 HMUg 6565.09656.89 1 H-104wp23 (Plan: 1 HMVd�+IFR-AK-CAZ-SC M J M J O o M 00 N _ 3 d o 3 CDMo o = 0 co 0 o .. I fl 76 L / ,CLn vJ 1 030 o I) I I c m U I i 0 0 500 1000 1500 2000 2500 3000 3500 Partial Measured Depth 11.25, May 03 2018 1 H-104wp23 SURVEY epth Froffiepth To 39.00 900.00 900.001895.00 900.001895.00 1895.003395.00 1895.006565.00 6565.003065.00 6565.0W656.89 Tool GYD-GC-SS MWD MWD+IFR-AK-CAZ-SC MWD MWD+IFR-AK-CAZ-SC MWD MWD+IFR-AK-CAZ-SC TVD MD 118.10 118.10 1800.001892.22 3855.106564.82 4078.1 m7656.88 Name 20" x 42" 10 3/4" 7-5/8" x 9-7/8" 4-1/2" x 6-3/4" MD Inc Azi TVD 39.00 0.00 0.00 39.00 300.00 0,00 0.00 300.00 600.00 4,50 242.00 599.69 900.00 12,00 242,00 896.38 1626.75 29,92 232.69 1572,44 1742A2 29.92 232.69 1672.44 1892.22 33.67 232.69 1800.00 1912.22 33.67 232.69 1816.65 2012,22 35.67 232.69 1898.89 3796,01 70.11 147.23 3084.13 4248.46 70A1 147.23 3238.03 5397.38 76.63 99.60 3585.10 6564.82 76.63 99.60 3855.10 6584,82 76,63 99.60 3859.73 6920.25 89.88 101.69 3899,03 7070.30 89.88 101.69 3899.34 7347,11 89.80 92. 00 3900,10 7625.70 88.34 82,36 3904.64 8417A2 88.34 82,36 3927.61 8639.10 87.80 89.00 3935.10 8694.60 87.52 90.64 3937.36 10773.88 87.52 90.64 4027,20 10819.37 87.70 89.75 4029.10 10943.46 88.48 87.39 4033.23 11052.85 88.48 87.39 4036,13 13471.43 88,00 39,00 4115.10 13719.33 87.43 34,07 4124,99 13819,94 87.43 34.07 4129.50 13980.38 90.00 30.00 4133.10 14218.32 93.82 23.97 4125,15 14451,09 93.82 23.97 4109.63 14568.57 94.50 20.50 4101.10 14668,29 95.45 17.65 4092.45 14922.31 95,45 17,65 4068.35 15186,00 93,35 10.00 4048.10 15456.33 91.22 �222.717,,z7z 4037.31 046577.39 91.224013.51 6615.74 90.00 34.b6 4013.10 16907,31 80.72 359.95 4036.65 17021.45 80.72 4055,05 17306.85 90.00 4078,10 17318.63 90.00 0,38 4078.10 17656.89 90.00 0,38 4078.10 H-04L1-01-_ _H-04L1., 0 IHH 1H-20 --- -- -- - 1 H-01------------330 270 300 240 210 .tom-} 1 H-106wp2 - - - 180 1 H-1 TC View Dleg TFace Target Annotation 0.00 0.00 0.00 0.00 KOP: Start 1.5'/100' DLS, 242' TF, for 300' 1.50 242.00 Start 2.5°/100' DLS, 0° TF, for 300' 2.50 0.00 Adjust TF to -15°, for 726.75' 2.50 -15.00 Hold for 115,37' 0.00 0.00 Start 2.5°/100' DLS, 0° TF, for 150.1' 2.50 0.00 Hold for 20' 0.00 0.00 Start 2°/100' DLS, 0° TF, for 100' 2.00 0.00 Start 4"/100' DLS,-98.37' TF, for 1783.79' 4.00 -98.37 Hold for 452.45' 0.00 0.00 Start 4°/100' DLS,-89.56° TF, for 1148.92' 4.00 -89.56 1 H-104 T00 WSD 090517Ff6M for 1167.44' 0.00 0,00 1 H-104 T00 WSA 090517AdFist TF to 0°, for 20' 0.00 0.00 Start 4"/100' DLS, 9.04" TF, for 335.43' 4.00 9.04 Hold for 150.05' 0.00 0.00 Start 3.5'/100' DLS, -90.51 ° TF, for 276.81' 3,50 -90,51 1 H-104 T01 090517 RP Adjust TF to-98.69°, for 278.59' 3.50 -98,69 Hold for 791.42' 0,00 0.00 Start 3°/100' DLS, 94.73' TF, for 221.99' 3.00 94.73 1 H-104 T02 090517 RP Adjust TF to 99.59°, for 55.5' 3.00 99,59 Hold for 2079.28' &00 0.00 Start 2*1100' DLS,-78.84' TF, for 45.49' 2.00 -78.84 1 H-104 T11 011018 RP Adjust TF to-71,660, for 124.09' 2.00 -71,66 Hold for 109.39' 0,00 0,00 Start 2*/100' DLS,-91.33' TF, for 2418.58' 2.00 -91,33 1 H-104 T12 011018 RP Adjust TF to-96.69", for 247.91' 2,00 -96.69 Hold for 100.61' 0.00 0.00 Start 3°/100' DLS,-57.79° TF, for 160.43' 3.00 -57.79 1 H-104 T13 011018 RP Adjust TF to-57.54', for 237.94' 3,00 -57,54 Hold for 232.78' 0.00 0.00 Start 3'/100' DLS,-78.82° TF, for 117.48' 3.00 -78.82 1 H-104 T14 011018 RP Adjust TF to-71.46", for 99.72' 3.00 -71.46 Hold for 254.02' 0.00 0.00 Start 3°/100' DLS,-105.040 TF, for 263,69' 3.00-105.04 1 H-104 T15 011018 RP Adjust TF to-105.07°, for 270.33' 3.00-105.07 Hold for 1121.07' 0.00 0.00 Start 3.25'/100' DLS,-167.53° TF, for 38.34' 3.25-167.53 1 H-104 T16 011018 RP Adjust TF to-168.24", for 291.57' 3.25-168.24 Hold for 114,14' 0,00 0.00 Start 3.25*/100' DLS, 0.3° TF, for 285.4' 3,25 0.30 1 H-104 T17 011918 RP Adjust TF to 90', for 11.77' 3.25 90.00 Hold for 338.26' 0,00 0.00 1 H-104 T18 011918 RP TD: 17656.89' MD, 4078.1' TVD 39 300 300 - 490 490 670 670 860 860 1040 1040 1230 1230 1410 1410 1600 1600 2280 2280 2950 2950 3630 3630 4300 4300 4980 4980 5650 5650 6330 6330 - 7000 7000 8330 8330 9660 9660-- 11000 11000 12330 12330 -- 13660 13660 14990 14990 16320 16320 17657 0 0 a Cl) a 3 v 0 ooQ � N 3 � O CC) N • ,n , M Q 3 U o = v C7 o U � `— j = p M- 12 r N { N N C, I � O O =a� � O 1 O .- O /�� V � ®, O M 0 = W iAm J _ CO (¢p M C) ce J � N J J m am M J O V � M o CL a rn •- J rn � ,Z Q = _ Co Q s t r 0 N M O (ui/1}sn 000£) 6uiU1JON AC Flipbook ConocoPhillips (Alaska) Inc. -Kup1 Kuparuk River Unit Kuparuk 1 H Pad Plan: 1 H-104 50029xxxxx00 Plan: 1 H-104 Plan: 1 H-104wp23 Error Ellipse Survey Report 03 May, 2018 Company: ConocoPhillips (Alaska) Inc. -Kupl Project: Kuparuk River Unit Site: Kuparuk 1 H Pad Well: Plan: 1 H-104 Wellbore: Plan: 1H-104 Design: 1 H-104wp23 Schlumberger Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature 1.00 sigma OAKEDMP2 Project Kuparuk River Unit, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor �Sfte Kuparuk 1 H Pad Position: Northing: Latitude: From: Map Easting: Longitude: Position Uncertainty: 0.00 usft Slot Radius: 0 " Grid Convergence: 0.37 ° Well Plan: 1 H-104 Well Position +N/-S 0.00 usft Northing: +E/-W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore Plan 1 H-104 Magnetics Model Name BGGM2017 Design 1 H-104wp23 Audit Notes: Sample Date 7/1512018 Version: Phase: Vertical Section: Depth From (TVD) (usft) 39.00 Latitude: Longitude: Ground Level: 54.10 usft Declination Dip Angle Field Strength (nT) 17.01 80.93 57,463 PLAN Tie On Depth: +Nl-S +E/-W (usft) (usft) 0.00 0.00 Survey Tool Program Date 5/3/2018 From To (usft) (usft) Survey (Wellbore) Tool Name Description 39.00 900.00 1 H-104wp23 (Plan: 1 H-104) GYD-GC-SS Gyrodata gyro single shots 900.00 1,895.00 1 H-104wp23 (Plan: 1 H-104) MWD MWD - Standard 900.00 1,895.00 1 H-1 04wp23 (Plan: 1 H-1 04) MWD+IFR-AK-CAZ-SC MWD+IFR AKCAZSCC 1,895.00 3,395.00 1 H-1 04wp23 (Plan: 1 H-1 04) MWD MWD- Standard 1,895.00 6,565.00 1 H-1 04wp23 (Plan: 1 H-1 04) MWD+IFR-AK-CAZ-SC MWD+IFR AKCAZSCC 6,565.00 8,065.00 1 H-104wp23 (Plan: 1 H-104) MWD MWD - Standard 6,565.00 17,656.89 1 H-104wp23 (Plan: 1 H-104) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 51312018 11:13.04AM Page 2 COMPASS 5000.14 Build 85 Schlumberger Error Ellipse Report Company: ConocoPhillips (Alaska) Inc. -Kup1 Local Co-ordinate Reference: Well Plan: 1 H-104 Project: Kuparuk River Unit TVD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Site: Kuparuk 1 H Pad MD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Well: Plan: 1 H-104 North Reference: True Wellbore: Plan: 1H-104 Survey Calculation Method: Minimum Curvature Design: 1 H-104wp23 Output errors are at 1.00 sigma Database: OAKEDMP2 Plan Survey Tool Program Date 5/3/2018 Depth From Depth To (usft) (usft) Survey (Wellbore) Tool Name Remarks 1 39.00 900.00 1 H-104wp23 (Plan: 1 H-104) GYD-GC-SS Gyrodata gyro single shots 2 900.00 1,895.00 1 H-1 04wp23 (Plan: 1 H-1 04) MWD MWD - Standard 3 900.00 1,895.00 1H-104wp23 (Plan: 1H-104) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 4 1,895.00 3,395.00 1H-104wp23 (Plan: 1H-104) MWD MWD - Standard 5 1,895.00 6,565.00 1 H-1 04wp23 (Plan: I H-1 04) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 6 6,565.00 8,065.001H-104wp23(Plan:1H-104) MWD MWD - Standard 7 6,565.00 17,656.89 1 H-1 04wp23 (Plan: 1 H-1 04) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Position uncertainty and bias at survey station Measured Inclination Azimuth Vertical Nighside lateral Vertical Magnitude Semi-cnajor Semi -minor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (usft) (°) t°) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usit) (°) 39.00 0.00 0.00 39.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 UNDEFINED 100.00 0.00 0.00 100.00 0.04 0.00 0.04 0.00 1.15 0.00 0.00 0.04 0.04 0.00 GYD-GC-SS (1, 1) 118.10 0.00 0.00 118.10 0.19 0.00 0.19 0.00 1.15 0.00 0.00 0.19 0.19 0.00 GYD-GC-SS (1, 1) 200.00 0.00 0.00 200.00 0.19 0.00 0.19 0.00 1.15 0.00 0.00 0.19 0.19 0.00 GYD-GC-SS (1, 1) 300.00 0.00 0.00 300.00 0.33 0.00 0.33 0.00 1.15 0.01 0.01 0.33 0.33 0.00 GYD-GC-SS (1, 1) 400.00 1.50 242.00 399.99 0.43 0.00 0.43 0.00 1.15 0.01 0.01 0.43 0.43 135.00 GYD-GC-SS (1, 1) 500.00 3.00 242.00 499.91 0.52 0.00 0.52 0.00 1.15 0.02 0.02 0.52 0.52 151.37 GYD-GC-SS (1, 1) 600.00 4.50 242.00 599.69 0.62 0.00 0.62 0.00 1A5 0.03 0.03 0.63 0.62 150.67 GYD-GC-SS (1, 1) 700.00 7.00 242.00 699.18 0.74 0.00 0.75 0.00 1.15 0.05 0.05 0.75 0.75 147.14 GYD-GC-SS (1, 1) 800.00 9.50 242.00 798.14 0.87 -0.01 0.89 0.00 1.15 0.07 0.07 0.89 0.89 66.15 GYD-GC-SS(1, 1) 900.00 12.00 242.00 896.38 1.01 -0.01 1.05 0.00 1.15 0.09 0.09 1.05 1.03 63.40 GYD-GC-SS (1, 1) 1,000.00 14.43 239.40 993.72 1.08 -0.01 1.15 -0.01 1.14 0.11 0.11 1.15 1.12 62.89 MWD (1, 2) 1,100.00 16.88 237.54 1,090.01 1.09 -0.02 1.30 -0.04 1.14 0.13 0.14 1.30 1.15 59.46 MWD (1, 2) 1,200.00 19.34 236.15 1,185.04 1.12 .0.02 1.59 -0.07 1.13 0.16 0.18 1.59 1.20 57.85 MWD (1, 2) 1,300.00 21.81 235.05 1,278.66 1.18 .0.03 2.01 -0.12 1.13 0.19 0.22 101 1.27 56.83 MWD (1, 2) 1,400.00 24.29 234.17 1,370.67 1.26 -0.04 2.54 -0.17 1.13 0.22 0.28 2.54 1.36 56.05 MWD (1, 2) 1,500.00 26.77 233.45 1,460.90 1.36 -0.04 3.15 -0.23 1.14 0.25 0.35 3.15 1.47 55.40 MWD (1, 2) 1,600.00 29.25 232.84 1,549.18 1.49 -0.05 3.84 -0.31 1.15 0.28 0.43 3.84 1.59 54.85 MWD (1, 2) 1,626.75 29.92 232.69 1,572.44 1.52 -0.06 4.04 -0.33 1.15 0.29 0.45 4.04 1.63 54.72 MWD (1, 2) 1,684.43 29.92 232.69 1,622.44 1.64 -0.06 4.59 -0.39 1.18 0.31 0.51 4.59 1.73 54.38 MWD (1, 2) 1,700.00 29.92 232.69 1,635.93 1.64 -0.06 4.59 -0.39 1.18 0.31 0.51 4.59 1.73 54.38 MWD (1. 2) 1,742.12 29.92 232.69 1,672.44 1.71 -0.06 4.91 -0.43 1.21 0.33 0.55 4.91 1.78 54.23 MWD (1, 2) 1,800.00 31.36 232.69 1,722.24 1.80 -0.06 5.36 -0.48 1.23 0.35 0.60 5.36 1.86 54.05 MWD (1, 2) 1,866.13 33.02 232.69 1,778.20 1.95 -0.08 6.13 -0.57 1.28 0.38 0.70 6.13 2.00 53.81 MWD (1, 2) 51312018 11:13:04AM Page 3 COMPASS 5000.14 Build 85 Company: ConocoPhillips (Alaska) Inc. -Kup1 Project: Kuparuk River Unit Site: Kuparuk 1 H Pad Well: Plan: 1 H-104 Wellbore: Plan: 1H-104 Design: 1 H-104wp23 Position uncertainty and bias at survey station Schlumberger Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature 1.00 sigma OAKEDMP2 Measured Inclination Azimuth vertical Highside Lateral Vertical Magnitude Semitnajor Semi -minor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (�) 1,892.22 33.67 232.69 1,800.00 1.95 -0.08 6.13 -0.57 1.28 0.38 0.70 6.13 2.00 53,81 MWD (2, 3) 1,900.00 33.67 232.69 1,806.47 1.53 -0.09 2.91 0.00 1.14 0.38 0.41 2.91 1.69 51.63 MWD(2,3) 1,912.22 33.67 232.69 1,816.65 1.53 -0.09 2.95 -0.01 1.15 0.39 0.41 2.95 1.69 51.70 MWD (2,3) 2,000.00 35.42 232.69 1,888.94 1.53 -0.10 3.32 -0.11 1.15 0.42 0.46 3.32 1.71 52.08 MWD (2,3) 2,012.22 35.67 232.69 1,898.89 1.54 -0.11 3.39 -0.12 1.14 0.42 0.47 3.39 1.72 52.12 MWD (2, 3) 2,100.00 35.31 226.67 1,970.38 1.60 -0.09 3.85 -0.19 1.17 0.46 0.54 3.86 1.75 52.01 MWD (2,3) 2,126.61 35.26 224.83 1,992.10 1.77 -0.07 4.38 -0.25 1.22 0.50 0.62 4.45 1.80 50.74 MWD (2,3) 2,200.00 35.26 219.74 2,052.04 1.77 -0.07 4.38 -0.25 1.22 0.50 0.62 4.45 1.80 50.74 MWD (2, 3) 2,300.00 35.61 212.87 2,133.55 2.04 -0.04 4.93 -0.28 1.27 0.54 0.69 5.10 1.87 48.54 MWD (2, 3) 2,400.00 36.34 206.17 2,214.51 2.38 -0.03 5.50 -0.28 1.34 0.58 0.75 5.79 1.97 45.79 MWD (2,3) 2,500.00 37.43 199.75 2,294.52 2.77 -0.02 6.06 -0.25 1.42 0.62 0.81 6.52 2.10 42.72 MWD (2, 3) 2,600.00 38.85 193.70 2,373.20 3.19 -0.02 6.62 -0.20 1.51 0.67 0.87 7.27 2.25 39.45 MWD (2,3) 2,700.00 40.56 188.03 2,450.16 3.61 -0.03 7.20 -0.12 1.61 0.71 0.92 8.06 2.42 36.07 MWD (2, 3) 2,800.00 42.53 182.78 2,525.02 4.01 -0.06 7.80 -0.01 1.72 0.75 0,97 8.87 2.60 32.61 MWD (2, 3) 2,900.00 44.72 177.93 2,597.42 4.38 -0.10 8.44 0.12 1.86 0.80 1.04 9.72 2.80 29A3 MWD (2, 3) 3,000.00 47.10 173.45 2,667.02 4.71 -0.15 9.12 0.28 2.01 0.84 1.12 10.61 3.01 25.64 MWD (2, 3) 3,100.00 49.64 169.31 2,733.46 5.00 -0.22 9.85 0.47 2.18 0.88 1.22 11.53 3.23 22.17 MWD (2, 3) 3,200.00 52.32 165.49 2,796.43 5.24 -0.29 10.63 0.69 2.37 0.92 1.35 12.51 3.47 18.75 MWD (2,3) 3,300.00 55.11 161.93 2,855.62 5.44 -0.38 11.47 0.94 2.58 0.96 1.52 13.53 3.70 15.39 MWD (2, 3) 3,400.00 58.00 158.62 2,910.74 3.06 -0.58 5.49 0.40 1.79 0.99 1.17 6.62 2.88 17.06 MWD+IFR-AK-CAZ-SC (3,3) 3,431.39 58.92 157.62 2,927.16 3.08 -0.64 5.84 0.42 1.89 1.02 1.22 7.03 3.01 13.51 MWD+IFR-AK-CAZ-SC (3,3) 3,500.00 60.97 155.51 2,961.52 3.08 -0.64 5.84 0.42 1.89 1.02 1.22 7.03 3.01 13.51 MWD+IFR-AK-CAZ-SC (3,3) 3,600.00 64.01 152.57 3,007.72 3.09 -0.70 6.21 0.45 2.00 1.05 1.27 7.45 3.13 10.10 MWD+IFR-AK-CAZ-SC (3,3) 3,700.00 67.10 149.79 3,049.11 3.09 -0.76 6.59 0.48 2.12 1.07 1.31 7.88 3.24 6.86 MWD+IFR-AK-CAZ-SC (3,3) 3,796.01 70.11 147.23 3,084.13 3.08 -0.82 6.96 0.51 2.24 1.09 1.35 8.31 3.35 3.91 MWD+IFR-AK-CAZ-SC (3,3) 3,800.00 70.11 147.23 3,085.49 3.08 -0.82 6.98 0.51 2.24 1.09 1.35 8.33 3.35 3.83 MWD+IFR-AK-CAZ-SC (3, 3) 3,90aw 70.11 147.23 3,119.50 3.21 -0.82 7.45 0.51 2.39 1.11 1.39 8.71 3.42 1.51 MWD+IFR-AK-CAZ-SC (3,3) 4,000.00 70.11 147.23 3,153.52 3.35 -0.82 7.94 0.51 2.54 1.13 1.43 9.11 3.50 179.36 MWD+IFR-AK-CAZ-SC (3,3) 4,009.30 70.11 147.23 3,156.68 3.49 -0.82 8.44 0.51 2.68 1.15 1.48 9,53 3.58 177.37 MWD+IFR-AK-CAZ-SC (3, 3) 4,100.00 70.11 147.23 3,187.53 3.49 -0.82 8.44 0.51 2.68 1.15 1.48 9.53 3.58 177.37 MWD+IFR-AK-CAZ-SC (3,3) 4,200.00 70.11 147.23 3,221.55 3.63 -0.82 8.94 0.51 2.83 1.17 1.53 9.97 3.66 175.54 MWD+IFR-AK-CAZ-SC (3, 3) 4,248.46 70.11 147.23 3,238.03 3.70 -0.82 9.19 0.51 2.91 1.18 1.55 10.18 3.69 174.71 MWD+IFR-AK-CAZ-SC (3,3) 4,300.00 70.14 145.04 3,255.55 3.81 -0.83 9.27 0.54 2.99 1.20 1.57 10.39 3.72 173.98 MWD+IFR-AK-CAZ-SC (3, 3) 4,393.56 70.26 141.06 3,287.25 4.03 -0.85 9.32 0.60 3.14 1.22 1.62 10.73 3.76 172.71 MWD+IFR-AK-CAZ-SC (3,3) 4,400.00 70.28 140.79 3,289.42 4.03 -0.85 9.32 0.60 3.14 1.22 1.62 10.73 3.76 172.71 MWD+IFR-AK-CAZ-SC (3, 3) 4,500.00 70.51 136.55 3,322.99 4.24 -0.87 9.35 0.67 3.29 1.24 1.67 11.07 3.82 171.32 MWD+IFR-AK-CAZ-SC (3,3) 4,600.00 70.84 132.33 3,356.10 4.44 -0.89 9.36 0.74 3.44 1.26 1.72 11.40 3.89 169.80 MWD+IFR-AK-CAZ-SC (3,3) 4,621.44 70.92 131.42 3,363.12 4.63 -0.92 9.34 0.80 3.60 1.28 1.76 11.74 3.99 168.18 MWD+IFR-AK-CAZ-SC (3, 3) 4,700.00 71.27 128.12 3,388.58 4.63 -0.92 9.34 0.80 3.60 1.28 1.76 11.74 3.99 168.18 MWD+IFR-AK-CAZ-SC (3,3) 4,800.00 71.79 123.94 3,420.28 4.81 -0.95 9.31 0.87 3.76 1.30 1.81 12.06 4.10 166.49 MWD+IFR-AK-CAZ-SC (3, 3) 4,900.00 72.40 119.78 3,451.04 4.98 -0.98 9.26 0.93 3.91 1.32 1.85 12.38 4.23 164.73 MWD+IFR-AK-CAZ-SC (3,3) 5,000.00 73.10 115.66 3,480.71 5.13 -1.02 9.19 1.00 4.07 1.34 1.90 12.68 4.38 162.91 MWD+IFR-AK-CAZ-SC (3,3) 5,100.00 73.87 111.57 3,509.14 5.26 -1.06 9.11 1.06 4.23 1.36 1.94 12.97 4.54 161.06 MWD+IFR-AK-CAZ-SC (3, 3) 5,200.00 74.73 107.51 3,536.21 5.38 -1.10 9.02 1.13 4.39 1.37 1.98 13.25 4.72 159.17 MWD+IFR-AK-CAZ-SC (3,3) 5,300.00 75.66 103.48 3,561.77 5.49 -1.14 8.92 1.19 4.55 1.39 2.02 13.52 4.92 157.25 MWD+IFR-AK-CAZ-SC (3,3) 5,397.38 76.63 99.60 3,585.10 5.57 -1.1B 8.83 1.24 4.71 1.41 2.05 13.76 5.13 155.37 MWD+IFR-AK-CAZ-SC (3,3) 5,400.00 76.63 99.60 3,585.71 5.58 -1.18 8.84 1.24 4.71 1.41 2.05 13.77 5.13 155.31 MWD+IFR-AK-CAZ-SC (3,3) 5,500.00 76.63 99.60 3,608.83 5.73 -1.18 9.39 1.24 4.87 1.42 2.09 14.08 5.29 153.09 MWD+IFR-AK-CAZ-SC (3, 3) 5,529.08 76.63 99.60 3,615.56 5.88 -1.18 9.95 1.24 5.04 1.44 2.12 14.41 5.44 150.95 MWD+IFR-AK-CAZ-SC (3,3) 5,600.00 76.63 99.60 3,631.96 5.88 -1.18 9.95 1.24 5.04 1.44 2.12 14.41 5.44 150.95 MWD+IFR-AK-CAZ-SC (3, 3) 5,700.00 76.63 99.60 3,655.09 6.03 -1.18 10.51 1.24 5.20 1.45 2.16 14.75 5.58 148.89 MWD+IFR-AK-CAZ-SC (3,3) 5,746.79 76.63 99.60 3,665.91 6.19 -1.18 11.07 1.24 5.37 1.47 2.20 15.12 5.71 146.92 MWD+IFR-AK-CAZ-SC (3,3) 5,800.00 76.63 99.60 3,678.22 6.19 -1.18 11.07 1.24 5.37 1.47 2.20 15.12 5.71 146.92 MWD+IFR-AK-CAZ-SC (3,3) 5,845.37 76.63 99.60 3,688.71 6.35 -1.18 11.64 1.24 5.53 1.48 2.25 15.50 5.83 145.03 MWD+IFR-AK-CAZ-SC (3,3) 51312018 11:13:04AM Page 4 COMPASS 5000.14 Build 85 Company: ConocoPhillips (Alaska) Inc. -Kupl Project: Kuparuk River Unit Site: Kuparuk 1 H Pad Well: Plan: 1 H-104 Wellbore: Plan: 1H-104 Design: 1 H-104wp23 Position uncertainty and bias at survey station Schlumberger Error Ellipse Report Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature 1.00 sigma OAKEDMP2 Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semi -major Semi -minor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (usft) (°) M (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (") 5,900.00 76.63 99.60 3,701.34 6.35 -1.18 11.64 1.24 5.53 1.48 2.25 15.50 5.83 145.03 MWD+IFR-AK-CAZ-SC (3, 3) 5,997.57 76.63 99.60 3,723.91 6.50 -1.18 12.21 1.24 5.70 1.50 2.29 15.89 5.94 143.24 MWD+IFR-AK-CAZ-SC (3, 3) 6,000.00 76.63 99.60 3,724.47 6.50 -1.18 12.21 1.24 5.70 1.50 2.29 15.89 5.94 143.24 MWD+IFR-AK-CAZ-SC (3,3) 6,100.00 76.63 99.60 3,747.60 6.66 -1.18 12.78 1.24 5.86 1.51 2.34 16.30 6.05 141.54 MWD+IFR-AK-CAZ-SC (3,3) 6,200.00 76.63 99.60 3,770.73 6.82 -1.18 13.36 1.24 6.03 1.53 2.38 16.73 6.15 139.93 MWD+IFR-AK-CAZ-SC (3,3) 6,220.72 76.63 99.60 3,775.52 6.98 -1.18 13.94 1.24 6.20 1.54 2.43 17.16 6.25 138.41 MWD+IFR-AK-CAZ-SC (3,3) 6,300.00 76.63 99.60 3,793.85 6.98 -1.18 13.94 1.24 6.20 1.54 2.43 17.16 6.25 138A1 MWD+IFR-AK-CAZ-SC (3,3) 6,400.00 76.63 99.60 3,816.98 7.14 -1.18 14.51 1.24 6.36 1.56 2.48 17.61 6.33 136.97 MWD+IFR-AK-CAZ-SC (3,3) 6,500.00 76.63 99.60 3,840+11 7.30 -1.18 15.09 1.24 6.53 1.58 2.53 18.07 6.41 135.62 MWD+1FR-AK-CAZ-SC (3,3) 6,564.82 76.63 99.60 3,855.10 7.41 -1.18 15.47 1.24 6.64 1.59 2.57 18.37 6.46 134.78 MWD (3, 4) 6,584.82 76.63 99.60 3,859.73 7.43 -1.18 15.59 1.30 6.63 1.59 2.60 18.52 6.55 134.90 MWD (3,4) 6,600.00 77.23 99.70 3,863.16 7.38 -1.20 15.69 1.38 6.63 1.59 2.65 18.61 6.53 134.73 MWD (3,4) 6,639.62 78.79 99.95 3,871.39 7.10 -1.32 16.48 1.91 6.64 1.60 3.02 19.22 6.48 133.43 MWD (3.4) 6,700.00 81.18 100.33 3,881.89 7.10 -1.32 16.48 1.91 6.64 1.60 3.02 19.22 6.48 133.43 MWD (3.4) 6,800.00 85.13 100.95 3,893.81 6.89 -1.45 17.42 2.45 6.68 1.61 3.43 19.93 6.52 131.90 MWD (3, 4) 6,900.00 89.08 101.56 3,898.85 6.76 -1.58 18.48 3.01 6.73 1.61 3.89 20.74 6.64 130.24 MWD (3,4) 6,920.25 89.88 101.69 3,899.03 6.75 -1.61 18.70 3.12 6.74 1.61 3.98 20.92 6.67 129.90 MWD (3, 4) 7,000.00 89.88 101.69 3,899.19 6.81 -1.61 19.56 3.57 6.80 1.61 4.37 21.65 6.80 128.53 MWD (3,4) 7,070.30 89.88 101.69 3,899.34 6.87 -1.61 20.36 3.98 6.87 1.61 4.72 22.34 6.93 127.32 MWD (3, 4) 7,100.00 89.88 100.65 3,899.40 6.90 -1.61 20.55 4AS 6.89 1.61 4.87 22.64 6.99 126.81 MWD(3,4) 7,200.00 89.84 97.15 3,899.64 7.01 -1.61 21.20 4.86 7.00 1.61 5.39 23.68 7.21 125.02 MWD (3, 4) 7,300+00 89.81 93.65 3,899.94 7.14 -1.61 21.85 5.52 7.13 1.61 5.92 24.75 7.46 123.14 MWD (3, 4) 7,347.11 89.80 92.00 3,900.10 7.20 -1.61 22.16 5.82 7.20 1.61 6.17 25.27 7.58 122.23 MWD (3,4) 7,400.00 89.52 90.17 3,900+41 7.29 -1.61 22.51 6.15 7.28 1.61 6.46 25.85 7.73 121.20 MWD (3,4) 7,500.00 88.99 86.71 3,901.71 7.47 -1.60 23.14 6.76 7.43 1.62 6.99 26.97 8.03 119.22 MWD (3,4) 7,600.00 88.47 83.25 3,903.92 7.66 -1.61 23.76 7.32 7.61 1.62 7.51 28.09 8.34 117.23 MWD (3, 4) 7,625.70 88.34 82.36 3,904.64 7.72 -1.61 23.91 7.46 7.65 1.62 7.64 28.38 8.42 116.71 MWD (3,4) 7,700.00 88.34 82.36 3,906,80 7.86 -1.61 24.99 7.85 7.79 1.62 8.03 29.23 8.65 115.26 MWD (3,4) 7,800.00 88.34 82.36 3,909.70 8.05 -1.61 26.46 8.38 7.99 1.62 8.54 30.41 8.95 113.42 MWD (3,4) 7,900.00 88.34 82.36 3,912.60 8.26 -1.61 27.95 8.90 8.20 1.62 9.06 31.64 9.23 111.70 MWD (3, 4) 8,000.00 88.34 82.36 3,915.50 8.48 -1.61 29.47 9.42 8.42 1.62 9.57 32.91 9.49 110.09 MWD (3,4) 8,100.00 88.34 82.36 3,918.41 7.23 -1.57 16.69 1.80 7.16 1.62 3.12 21.76 7.49 125.45 MWD+IFR-AK-CAZ-SC (4,4) 8,200.00 88.34 82.36 3,921.31 7.30 -1.57 17.09 1.80 7.23 1.63 3.16 22.02 7.64 124.58 MWD+IFR-AK-CAZ-SC (4,4) 8,300.00 88.34 82.36 3,924.21 7.37 -1.57 17.51 1.80 7.31 1.63 3.19 22.29 7.80 123.70 MWD+IFR-AK-CAZ-SC (4,4) 8,400.00 88.34 82.36 3,927.11 7.45 -1.57 17.93 1.80 7.39 1.63 3.23 22.57 7.96 122.82 MWD+IFR-AK-CAZ-SC (4,4) 8,417.12 88.34 82.36 3,927.61 7.46 -1.57 18.00 1.80 7.40 1.63 3.24 22.62 7.99 122.67 MWD+IFR-AK-CAZ-SC (4,4) 8,500.00 88.13 84.84 3,930.16 7.54 -1.56 18.87 1.70 7.47 1.63 3.27 22.86 8.11 121.96 MWD+IFR-AK-CAZ-SC (4,4) 8,600.00 87.89 87.83 3,933.63 7.63 -1.54 19.87 1.58 7.55 1.63 3.31 23.16 8.25 121.17 MWD+IFR-AK-CAZ-SC (4,4) 8,639.10 87.80 89.00 3,935.10 7.66 -1.54 20.26 1.53 7.58 1.63 3.32 23.29 8.30 120.86 MWD+IFR-AK-CAZ-SC (4,4) 8,694.60 87.52 90.64 3,937.36 7.72 -1.52 20.79 1.46 7.63 1.64 3.35 23.47 8.37 120.44 MWD+IFR-AK-CAZ-SC (4, 4) 8,700.00 87.52 90.64 3,937.60 7.73 -1.52 20.81 1.46 7.64 1.64 3.35 23.49 8.38 120.40 MWD+IFR-AK-CAZ-SC (4,4) 8,800.00 87.52 90.64 3,941.92 7.82 -1.52 21.26 1.46 7.73 1.64 3.39 23.84 8.51 119.64 MWD+IFR-AK-CAZ-SC (4,4) 8,900.00 87.52 90.64 3,946.24 7.91 -1.52 21.71 1.46 7.82 1.64 3.44 24.20 8.64 118.88 MWD+IFR-AK-CAZ-SC (4,4) 9,000.00 87.52 90.64 3,950.56 8.01 -1.52 22.17 1.46 7.92 1.64 3.48 24.57 8.76 118.15 MWD+IFR-AK-CAZ-SC (4,4) 9,100.00 87.52 90,64 3,954.88 8.10 -1.52 22.63 1.46 8.02 1.65 3.53 24.95 8.88 117.42 MWD+IFR-AK-CAZ-SC (4,4) 9,200.00 87.52 90.64 3,959.20 8.21 -1.52 23.10 1.46 8.12 1.65 3.58 25.34 9.00 116.71 MWD+IFR-AK-CAZ-SC (4,4) 9,300.00 87.52 90.64 3,963.52 8.31 -1.52 23.58 1.46 8.23 1.65 3.62 25.73 9.11 116.02 MWD+IFR-AK-CAZ-SC (4,4) 9,400.00 87.52 90.64 3,967.84 8.42 -1.52 24.06 1.46 8.33 1.65 3.67 26.14 9.22 115.35 MWD+IFR-AK-CAZ-SC (4,4) 9,500.00 87.52 90.64 3,972.16 8.52 -1.52 24.54 1.46 8.44 1.65 3.72 26.55 9.33 114.69 MWD+IFR-AK-CAZ-SC (4,4) 9,600.00 87.52 90.64 3,976.48 8.64 -1.52 25.03 1.46 8.55 1.66 3.76 26.97 9.43 114.06 MWD+IFR-AK-CAZ-SC (4,4) 9,700.00 87.52 90.64 3,980.81 8.75 -1.52 25.52 1.46 8.67 1.66 3.81 27.39 9.53 113.44 MWD+IFR-AK-CAZ-SC (4,4) 9,800+00 87.52 90.64 3,985.13 8.86 -1.52 26.02 1.46 8.79 1.66 3.86 27.82 9.63 112.84 MWD+IFR-AK-CAZ-SC (4,4) 9,900.00 87.52 90.64 3,989.45 8.98 -1.52 26,52 1.46 8.90 1.66 3.91 28.26 9.72 112.26 MWD+IFR-AK-CAZ-SC (4,4) 10,000.00 87.52 90.64 3,993.77 9.10 -1.52 27.02 1.46 9.02 1.67 3.96 28.71 9.81 111.69 MWD+IFR-AK-CAZ-SC (4,4) 51312018 11:13:04AM Page 5 COMPASS 5000.14 Build 85 Company: ConocoPhillips (Alaska) Inc. -Kupl Project: Kuparuk River Unit Site: Kuparuk 1H Pad Well: Plan: 1 H-104 Wellbore: Plan: 1H-104 Design: 1 H-104wp23 Position uncertainty and bias at survey station Schlumberger Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature 1.00 sigma OAKEDMP2 Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semi -major Semi -minor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (usft) (`) (°) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (°) 10,100.00 87.52 90.64 3,998.09 9.22 -1.52 27.53 1.46 9.15 1.67 4.01 29.16 9.90 111.15 MWD+IFR-AK-CAZ-SC (4, 4) 10,200.00 87.52 90.64 4,002.41 9.35 -1.52 28.04 1.46 9.27 1.67 4.06 29.61 9.98 110.63 MWD+IFR-AK-CAZ-SC (4,4) 10,300.00 87.52 90.64 4,006.73 9.47 -1.52 28.55 1.46 9.40 1.67 4.11 30.07 10.07 110.12 MWD+IFR-AK-CAZ-SC (4,4) 10,400.00 87.52 90.64 4,011.05 9.60 -1.52 29.06 1.46 9.52 1.68 4.16 30.54 10.14 109.63 MWD+IFR-AK-CAZ-SC (4,4) 10,500.00 87.52 90.64 4,015.37 9.73 -1.52 29.58 1.46 9.65 1.68 4.21 31.01 10.22 109.15 MWD+IFR-AK-CAZ-SC (4,4) 10,600.00 87.52 90.64 4,019.69 9.86 -1.52 30.10 1A6 9.78 1.68 4.26 31.48 10.29 108.70 MWD+IFR-AK-CAZ-SC (4,4) 10,700.00 87.52 90.64 4,024.01 9.99 -1.52 30.62 1.46 9.92 1.69 4.31 31.96 10.36 108.26 MWD+IFR-AK-CAZ-SC (4,4) 10,773.88 87.52 90.64 4,027.20 10.09 -1.52 31.01 1.46 10.02 1.69 4.35 32.32 10.41 107.94 MWD+IFR-AK-CAZ-SC (4,4) 10,800.00 87.62 90.13 4,028.31 10.12 -1.53 31.07 1.49 10.05 1.69 4.36 32.44 10.43 107.83 MWD+IFR-AK-CAZ-SC (4,4) 10,819.37 87.70 89.75 4,029.10 10.14 -1.54 31.11 1.52 10.08 1.69 4.37 32.53 10.44 107.75 MWD+IFR-AK-CAZ-SC (4,4) 10,900.00 88.21 88.22 4,031.98 10.24 -1.57 31.27 1.62 10.19 1.69 4.41 32.91 10.49 , 107.42 MWD+IFR-AK-CAZ-SC (4,4) 10,943.46 88A8 87.39 4,033.23 10.29 -1.59 31.36 1.67 10.25 1.69 4.43 33.12 10.52 107.23 MWD+IFR-AK-CAZ-SC (4,4) 11,000.00 88.48 87.39 4,034.73 10.37 -1.59 31.65 1.67 10.32 1.69 4.46 33.39 10.56 106.99 MWD+IFR-AK-CAZ-SC (4,4) 11,052.85 88.48 87.39 4,036.13 10.44 -1.59 31.93 1.67 10.40 1.69 4.48 33.64 10.60 106.76 MWD+IFR-AK-CAZ-SC (4,4) 11,100.00 88.46 86.45 4,037.39 10.51 -1.59 32.01 1.73 10.46 1.69 4.51 33.86 10.63 106.56 MWD+IFR-AK-CAZ-SC (4,4) 11,200.00 88.42 84.45 4,040.11 10.65 -1.59 32.14 1.87 10.60 1.69 4.56 34.33 10.70 106.14 MWD+IFR-AK-CAZ-SC (4,4) 11,300.00 88.37 82.45 4,042.91 10.79 -1.59 32.24 2.00 10.74 1.70 4.60 34.78 10.77 105.71 MWD+IFR-AK-CAZ-SC (4,4) 11,400.00 88.33 80.45 4,045.79 10.94 -1.59 32.30 2.13 10.88 1.70 4.65 35.23 10.84 105.27 MWD+IFR-AK-CAZ-SC (4,4) 11,500.00 88.29 78.45 4,048.73 11.08 -1.59 32.33 2.26 11.02 1.70 4.70 35.68 10.91 104.81 MWD+IFR-AK-CAZ-SC (4,4) 11,600.00 88.26 76.45 4,051.74 11.23 -1.59 32.33 2.39 11.17 1.70 4.74 36.11 10.99 104.35 MWD+IFR-AK-CAZ-SC (4,4) 11,700.00 88.22 74.45 4,054.81 11.38 -1.59 32.29 2.52 11.31 1.70 4.79 36.54 11.06 103.87 MWD+IFR-AK-CAZ-SC (4, 4) 11,800.00 88.19 72.45 4,057.93 11.53 -1.59 32.22 2.65 11.46 1.70 4.83 36.97 11.14 103.39 MWD+IFR-AK-CAZ-SC (4,4) 11,900.00 88.16 70.45 4,061.11 11.68 -1.59 32.11 2.78 11.61 1.71 4.88 37.38 11.23 102.89 MWD+IFR-AK-CAZ-SC (4,4) 12,000.00 88.13 68.45 4,064.35 11.83 -1.59 31.97 2.91 11.75 1.71 4.92 37.78 11.31 102.39 MWD+IFR-AK-CAZ-SC (4,4) 12,100.00 88.11 66A4 4,067.63 11.99 -1.59 31.80 3.03 11.90 1.71 4.97 38.18 11.39 101.88 MWD+IFR-AK-CAZ-SC (4,4) 12,200.00 88.09 64.44 4,070.95 12.14 -1.59 31.59 3.15 12.05 1.71 5.01 38.57 11.48 101.37 MWD+IFR-AK-CAZ-SC(4,4) 12,300.00 88.06 62.44 4,074.31 12.29 -1.60 31.35 3.27 12.20 1.71 5.05 38.94 11.57 100.85 MWD+IFR-AK-CAZ-SC (4,4) 12,400.00 88.05 60.44 4,077.70 12.45 -1.60 31.08 3.39 12.35 1.72 5.09 39.31 11.66 100.32 MWD+IFR-AK-CAZ-SC (4, 4) 12,500.00 88.03 58.44 4,081.12 12.61 -1.60 30.77 3.51 12.50 1.72 5.13 39.66 11.75 99.79 MWD+IFR-AK-CAZ-SC (4,4) 12,600.00 88.02 56.44 4,084.57 12.76 -1.61 30.43 3.62 12.65 1.72 5.17 40.01 11.85 99.26 MWD+IFR-AK-CAZ-SC (4,4) 12,700.00 88.00 54.44 4,088.05 12.92 -1.61 30.06 3.74 12.81 1.72 5.20 40.34 11.95 98.72 MWD+IFR-AK-CAZ-SC (4, 4) 12,800.00 88.00 52.44 4,091.54 13.08 -1.61 29.66 3.85 12.96 1.72 5.24 40.67 12.05 98.18 MWD+IFR-AK-CAZ-SC (4,4) 12,900.00 87.99 50.44 4,095.04 13.24 -1.62 29.23 3.95 13.12 1.73 5.28 40.98 12.15 97.63 MWD+IFR-AK-CAZ-SC (4,4) 13,000.00 87.99 48.43 4,098.55 13.40 -1.62 28.78 4.06 13.27 1.73 5.31 41.28 12.25 97.09 MWD+IFR-AK-CAZ-SC (4,4) 13,100.00 87.98 46.43 4,102.07 13.55 -1.63 28.29 4.16 13.43 1.73 5.34 41.56 12.36 96.54 MWD+IFR-AK-CAZ-SC (4,4) 13,200.00 87.99 44.43 4,105.58 13.71 -1.63 27.78 4.26 13.58 1.73 5.38 41.84 12.48 96.00 MWD+IFR-AK-CAZ-SC (4,4) 13,300.00 87.99 42.43 4,109.10 13.87 -1.64 27.25 4.36 13.74 1.73 5.41 42.10 12.59 95.45 MWD+IFR-AK-CAZ-SC (4,4) 13,400.00 87.99 40.43 4,112.60 14.03 -1.64 26.70 4.45 13.89 1.74 5.44 42.35 12.71 94.91 MWD+IFR-AK-CAZ-SC(4,4) 13,471.43 88.00 39.00 4,115.10 14.15 -1.65 26.29 4.51 14.01 1.74 5.46 42.53 12.80 94.52 MWD+IFR-AK-CAZ-SC (4,4) 13,500.00 87.93 38.43 4,116.11 14.20 -1.65 26.12 4.54 14.05 1.74 5.47 42.59 12.84 94.36 MWD+IFR-AK-CAZ-SC (4,4) 13,600.00 87.70 36.44 4,119.92 14.38 -1.64 25.53 4.62 14.21 1.74 5.50 42.82 12.96 93.83 MWD+IFR-AK-CAZ-SC (4,4) 13,700.00 87.47 34.46 4,124.13 14.57 -1.64 24.93 4.70 14.37 1.74 5.52 43.03 13.10 93.29 MWD+IFR-AK-CAZ-SC (4,4) 13,719.33 87.43 34.07 4,124.99 14.61 -1.64 24.81 4.72 14.40 1.74 5.53 43.07 13.13 93.19 MWD+IFR-AK-CAZ-SC(4,4) 13,800.00 87.43 34.07 4,128.61 14.73 -1.64 25.12 4.72 14.53 1.75 5.55 43.23 13.18 92.78 MWD+IFR-AK-CAZ-SC(4,4) 13,819.94 87.43 34.07 4,129.50 14.77 -1.64 25.19 4.72 14.56 1.75 5.55 43.27 13.19 92.69 MWD+IFR-AK-CAZ-SC (4,4) 13,900.00 88.71 32.04 4,132.20 14.77 -1.70 24.43 4.80 14.69 1.75 5.58 43.43 13.24 92.28 MWD+IFR-AK-CAZ-SC (4,4) 13,980.38 90.00 30.00 4,133.10 14.82 -1.75 23.69 4.88 14.82 1.75 5.59 43.59 13.34 91.85 MWD+IFR-AK-CAZ-SC (4,4) 14,000.00 90.32 29.50 4,133.05 14.83 -1.76 23.51 4.90 14.85 1.75 5.60 43.63 13.37 91.74 MWD+IFR-AK-CAZ-SC (4,4) 14,100.00 91.93 26.97 4,131.09 14.96 -1.81 22.60 4.98 15.01 1.75 5.61 43.80 13.51 91.20 MWD+IFR-AK-CAZ-SC(4,4) 14,200.00 93.53 24.43 4,126.33 15.17 -1.85 21.69 5.06 15.17 1.75 5.63 43.96 13.67 90.67 MWD+IFR-AK-CAZ-SC (4,4) 14,218.32 93.82 23.97 4,125,15 15.21 -1.85 21.52 5.08 15.20 1.75 5.63 43.99 13.70 90.57 MWD+IFR-AK-CAZ-SC (4,4) 14,300.00 93.82 23.97 4,119.71 15.34 -1.85 21.81 5.08 15.33 1.74 5.64 44.11 13.78 90.17 MWD+IFR-AK-CAZ-SC (4,4) 14,40D.00 93.82 23.97 4,113.04 15.50 -1.85 22A0 5.08 15.49 1.74 5.65 44.25 13.80 89.72 MWD+IFR-AK-CAZ-SC (4,4) 14,451.09 93.82 23.97 4,109.63 15.58 -1.85 22.26 5.08 15.57 1.74 5.66 44.32 13.82 89.49 MWD+IFR-AK-CAZ-SC (4,4) 5/3/2018 11:13:04AM Page 6 COMPASS 5000.14 Build 85 Company: ConocoPhillips (Alaska) Inc. -Kupl Project: Kuparuk River Unit Site: Kuparuk 1 H Pad Well: Plan: 1 H-104 Wellbore: Plan: 1 H-104 Design: 1 H-104wp23 Position uncertainty and bias at survey station Schlumberger Error Ellipse Report Local Co-ordinate Reference TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature 1.00 sigma OAKEDMP2 Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Senn-jor Semi -minor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (°) 14,500.00 94.11 22.52 4,106.25 15.68 -1.85 21.68 5.12 15.65 1.74 5.66 44.39 13.87 89.26 MWD+IFR-AK-CAZ-SC (4,4) 14,568.57 94.50 20.50 4,101.10 15.82 -1.85 20.91 5.18 15.76 1.74 5.67 44.48 13.99 88.91 MWD+IFR-AK-CAZ-SC (4,4) 14,600.00 94.80 19.60 4,098.55 15.90 -1.85 20.58 5.20 15.81 1.74 5.67 44.52 14.05 88.75 MWD+IFR-AK-CAZ-SC (4,4) 14,668.29 95A5 17.65 4,092.45 16.08 -1.85 19.89 5.25 15.92 1.73 5.68 44.60 14.19 88.40 MWD+IFR-AK-CAZ-SC (4.4) 14,700.00 95.45 17.65 4,089.45 16.13 -1.85 19.99 5.25 15.98 1.73 5.68 44.64 14.22 88.25 MWD+IFR-AK-CAZ-SC (4,4) 14,800.00 95.45 17.65 4,079.96 16.29 -1.85 20.26 5.25 16.14 1.73 5.69 44.74 14.27 87.83 MWD+IFR-AK-CAZ-SC (4,4) 14,900.00 95.45 17.65 4,070.47 16.45 -1.85 20.53 5.25 16.30 1.73 5.70 44.85 14.32 87.40 MWD+IFR-AK-CAZ-SC (4,4) 14,922.31 95.45 17.65 4,068+35 16.48 -1.85 20.60 5.25 16.34 1.72 5.70 44.87 14.34 87.30 MWD+IFR-AK-CAZ-SC (4,4) 15,000.00 94.84 15.39 4,061.39 16.56 -1.82 19.72 5.30 16.46 1.72 5.70 44.95 14.41 86.97 MWD+IFR-AK-CAZ-SC (4, 4) 15,100.00 94.04 12.49 4,053.64 16.66 -1.78 18.67 5.36 16.62 1.72 5.71 45.04 14.54 86.55 MWD+IFR-AK-CAZ-SC (4,4) 15,186.00 93.35 10.00 4,048.10 16.76 -1.76 17.85 5.39 16.77 1.72 5.71 45.11 14.66 86.19 MWD+IFR-AK-CAZ-SC(4,4) 15,200.00 93.24 9.59 4,047.30 16.78 -1.76 17.72 5.40 16.79 1.72 5.71 45.11 14.68 86.13 MWD+IFR-AK-CAZ-SC (4,4) 15,300.00 92.46 6.69 4,042.33 16.92 -1.73 16.90 5.43 16.95 1.71 5.72 45.17 14.83 85.74 MWD+IFR-AK-CAZ-SC (4, 4) 15,400.00 91.66 3.80 4,038.73 17.08 -1.72 16.26 5.45 17.12 1.71 5.72 45.22 15.00 85.36 MWD+IFR-AK-CAZ-SC (4,4) 15,456.33 91.22 2.17 4,037.31 17.17 -1.72 15.98 5.46 17.21 1.71 5.72 45.24 15.10 85.15 MWD+IFR-AK-CAZ-SC (4,4) 15,500.00 91.22 2.17 4,036.39 17.24 -1.72 16.06 5.46 17.28 1.71 5.72 45.25 15.15 85.00 MWD+IFR-AK-CAZ-SC (4, 4) 15,600.00 91.22 2.17 4,034.26 17.41 -1.72 16.20 5.46 17.45 1.71 5.72 45.28 15.21 84.66 MWD+IFR-AK-CAZ-SC (4,4) 15,700.00 91.22 2.17 4,032.14 17.58 -1.72 16.36 5.46 17.61 1.71 5.73 45.31 15.29 84.32 MWD+IFR-AK-CAZ-SC (4,4) 15,800.00 91.22 2.17 4,030.02 17.74 -1.72 16.54 5.46 17.78 1.71 5.73 45.35 15.38 83.97 MWD+IFR-AK-CAZ-SC (4,4) 15,900.00 91.22 2.17 4,027.89 17.91 -1.72 16.74 5.46 17.95 1.71 5.73 45.38 15.49 83.62 MWD+IFR-AK-CAZ-SC (4,4) 16,000.00 91.22 2.17 4,025.77 18.07 -1.72 16.95 5.46 18.11 1.71 5.73 45.42 15.62 83.27 MWD+IFR-AK-CAZ-SC (4,4) 16,100.00 91.22 2.17 4,023.64 18.24 -1.72 17.19 5.46 18.28 1.71 5.74 45.46 15.76 82.91 MWD+IFR-AK-CAZ-SC(4,4) 16,200.00 91.22 2.17 4,021.52 18.41 -1.72 17.43 5.46 18.45 1.70 5.74 45.50 15.91 82.55 MWD+IFR-AK-CAZ-SC (4,4) 16,300.00 91.22 2.17 4,019.40 18.57 -1.72 17.70 5.46 18.61 1.70 5.74 45.54 16.08 82.19 MWD+IFR-AK-CAZ-SC (4,4) 16,400.00 91.22 2.17 4,017.27 18.74 -1.72 17.98 5.46 18.78 1.70 5.75 45.58 16.27 81.82 MWD+IFR-AK-CAZ-SC (4,41) 16,500.00 91.22 2.17 4,015.15 18.91 -1.72 18.27 5.46 18.95 1.70 5.75 45.63 16.47 81.45 MWD+IFR-AK-CAZ-SC (4,4) 16,577.39 91.22 2.17 4,013.51 19.04 -1.72 1&51 5,46 19.08 1.70 5.76 45.66 16.63 81.16 MWD+IFR-AK-CAZ-SC (4,4) 16,600.00 90.50 2.01 4,013.17 19.10 -1.71 18.49 5.46 19.12 1.70 5.76 45.67 16.64 81.09 MWD+IFR-AK-CAZ-SC (4, 4) 16,616.74 90.00 1.90 4,013.10 19.14 -1.70 18.45 5.46 19.14 1.70 5.76 45.68 16.63 81.07 MWD+IFR-AK-CAZ-SC (4,4) 16,700.00 87.32 1.34 4,015.07 19.51 -1.67 18.25 5.47 19.29 1.70 5.77 45.70 16.55 80.93 MWD+IFR-AK-CAZ-SC (4,4) 16,800.00 84.14 0.68 4,022.52 20.18 -1.63 18.03 5.48 19.45 1.71 5.78 45.72 16.47 80.76 MWD+IFR-AK-CAZ-SC (4,4) 16,900.00 80.96 0.00 4,035.49 21.06 -1.59 17.83 5.48 19.62 1.72 5.79 45.74 16.41 80.61 MWD+IFR-AK-CAZ-SC (4,4) 16,907.31 80.72 359.95 4,036.65 21.13 -1.58 17.81 5.48 19.63 1.72 5.79 45.74 16.40 80.60 MWD+IFR-AK-CAZ-SC (4,4) 17,000.00 80.72 359.95 4,051.59 21.28 -1.58 17.95 5.48 19.78 1.73 5.80 45.77 16.48 80.36 MWD+IFR-AK-CAZ-SC (4,41) 17,021.45 80.72 3%95 4,055.05 21.31 -1.58 18.02 5.48 19.82 1.73 5.81 45.78 16.53 80.28 MWD+IFR-AK-CAZ-SC (4,4) 17,100.00 83.28 359.97 4,065.98 20.84 -1.63 18.26 5.48 19.95 1.74 5.82 45.81 16.70 80.00 MWD+IFR-AK-CAZ-SC(4,4) 17,200.00 86.53 359.98 4,074.86 20.44 -1.69 18.59 5.48 20.12 1.75 5.83 45.86 16.94 79.63 MWD+IFR-AK-CAZ-SC (4,4) 17,300.00 89.78 360.00 4,078.09 20.30 -1.75 18.92 5.48 20.29 1.75 5.84 45.90 17.18 79.26 MWD+IFR-AK-CAZ-SC (4,4) 17,306.85 90.00 0.00 4,078.10 20.30 -1.75 18.94 5.48 20.30 1.75 5.85 45.91 17.19 79.23 MWD+IFR-AK-CAZ-SC (4,41) 17,318.63 90.00 0.38 4,078.10 20.32 -1.75 19.08 5.48 20.32 1.75 5.85 45.91 17.20 79.20 MWD+IFR-AK-CAZ-SC (4,4) 17,400.00 90.00 0.38 4,078.10 20.46 -1.75 19.19 5.48 20.46 1.75 5.85 45.94 17.26 79.01 MWD+IFR-AK-CAZ-SC (4,4) 17,600.00 90.00 0.38 4,078.10 20.63 -1.75 19.54 5.48 20.63 1.75 5.87 45.99 17.52 78.62 MWD+IFR-AK-CAZ-SC (4,4) 17,600.00 90.00 0.38 4,078.10 20.79 -1.75 19.91 5.48 20.79 1.75 5.88 46.04 17.79 78.23 MWD+IFR-AK-CAZ-SC (4,4) 17,656.89 90.00 0.38 4,078.10 20.89 -1.75 20.12 5.48 20.89 1.75 5.88 46.07 17.94 78.00 MWD+IFR-AK-CAZ-SC (4,4) 51312018 11:13:04AM Page 7 COMPASS 5000.14 Build 85 Schlumberger Error Ellipse Report Company: ConocoPhillips (Alaska) Inc. -Kupl Local Co-ordinate Reference: Well Plan: 1 H-104 Project: Kuparuk River Unit TVD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Site: Kuparuk 1 H Pad MD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Well: Plan: 1 H-104 North Reference: True Wellbore: Plan: 1H-104 Survey Calculation Method: Minimum Curvature Design: 1H-104wp23 Output errors are at 1.00 sigma Database: OAKEDMP2 Design Targets Target Name hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Shape (°) (°) (usft) (usft) (usft) 1 H-104 T00 WSD 09051 0.00 0.00 3,585.10 -2,409.42 744.90 - plan hits target center - Circle (radius 100.00) 1 H-1 04 TOO WSA 09051 0.00 0.00 3,855.10 -2,598.79 1,864.79 - plan hits target center - Circle (radius 100.00) 1 H-104 T01 090517 RP 0.00 0.00 3,900.10 -2,726.85 2,632.04 - plan hits target center - Circle (radius 100.00) 1 H-104 T02 090517 RP 0.00 0.00 3,935.10 -2,591.25 3,915.09 - plan hits target center - Circle (radius 100.00) 1H-104 T16 011018 RP 0.00 0.00 4,013.10 1,418.52 9,200.04 - plan hits target center - Circle (radius 100.00) 11-1-104 T11 011018 RP 0.00 0.00 4,029.10 -2,614.56 6,093.19 - plan hits target center - Circle (radius 100.00) 1H-104 T15 011018 RP 0.00 0.00 4,048.10 -8.17 9,127.67 plan hits target center Circle (radius 100.00) 1 H-104 T17 011918 RP 0.00 0.00 4,078.10 2,105.57 9,204.56 - plan hits target center - Circle (radius 100.00) 1 H-104 T18 011918 RP 0.00 0.00 4,078.10 2,455.60 9,206.85 - plan hits target center - Circle (radius 100.00) 1H-104 T14 011018 RP 0.00 0.00 4,101.10 -598.11 8,955.77 - plan hits target center - Circle (radius 100.00) 1H-104T12011018RP 0.00 0.00 4,115.10 -1,548.71 8,420.47 - plan hits target center - Circle (radius 100.00) 111-104 T13 011018 RP 0.00 0.00 4,133.10 -1,130.56 8,709.25 - plan hits target center - Circle (radius 100.00) Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name 118.10 118.10 20" x 42" 20 42 1,892.22 1,800.00 10 3/4" 10-3/4 13-1/2 6,564.82 3,855.10 7-5/8" x 9-7/8" 7-5/8 9-7/8 17,656.89 4,078.10 4-1/2" x 6-3/4" 4-1/2 6-3/4 5/3/2018 11:13:04AM Page 8 COMPASS 5000.14 Build 85 Company: ConocoPhiliips (Alaska) Inc. -Kupl Project: Kuparuk River Unit Site: Kuparuk 1 H Pad Well: Plan: 1 H-104 Wellbore: Plan: 1H-104 Design: 1 H-104wp23 Schlumberger Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature 1.00 sigma OAKEDMP2 Formations Measured Vertical Dip Depth Depth pip Direction (usft) (usft) Name Lithology 1,684.43 1,622.44 Base Perm 0.00 1,866.13 1,778.20 T-3 0.00 2,126.61 1,992.10 K-15 0.00 3,431.39 2,927.16 UG_C 0.00 4,009.30 3,156.68 UG_B 0.00 4,393.56 3,287.25 UG_A 0.00 4,621.44 3,363.12 Na 0.00 5,529.08 3,615.56 WS_D 5,746.79 3,665.91 WS_C 5,845.37 3,688.71 WS_B 5,997.57 3,723.91 WS_A4 6,220.72 3,775.52 WS_A3 6,639.62 3,871.39 WS_A2 51312018 11:13:04AM Page 9 COMPASS 5000.14 Build 85 Schlumberger Error Ellipse Report Company: ConocoPhillips (Alaska) Inc. -Kupl Local Co-ordinate Reference: Well Plan: 1H-104 Project: Kuparuk River Unit TVD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Site: Kuparuk 1 H Pad MD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Well: Plan: 1 H-104 North Reference: True Wellbore: Plan: 1 H-104 Survey Calculation Method: Minimum Curvature Design: 1H-104wp23 Output errors are at 1.00 sigma Database: OAKEDMP2 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 300.00 300.00 0.00 0.00 KOP: Start 1.5'/100' DLS, 242' TF, for 300' 600.00 599.69 -5.53 -10.40 Start 2.5*/100' DLS, 0° TF, for 300' 900.00 896.38 -25.72 -48.38 Adjust TF to -15°, for 726.75' 1,626.75 1,572.44 -172.27 -261.00 Hold for 115.37' 1,742.12 1,672.44 -207.15 -306.77 Start 2.5°/100' DLS, 0° TF, for 150.1' 1,892.22 1,800.00 -255.08 -369.65 Hold for20' 1,912.22 1,816.65 -261.80 -378.47 Start 2*/100' DLS, 0° TF, for 100' 2,012.22 1,898.89 -296.28 -423.71 Start 4'/100' DLS,-98.37' TF, for 1783.79' 3,796.01 3,084.13 -1,472.88 -377.18 Hold for 452.45' 4,248.46 3,238.03 -1,830.63 -146.89 Start 4'/100' DLS,-89.56' TF, for 1148.92' 5,397.38 3,585.10 -2,409.42 744.90 Hold for 1167.44' 6,564.82 3,855.10 -2,598.79 1,864.79 Adjust TF to 0°, for 20' 6,584.82 3,859.73 -2,602.04 1,883.98 Start 4'/100' DLS, 9.04' TF, for 335.43' 6,920.25 3,899.03 -2,663.50 2,210.59 Hold for 150,05' 7,070.30 3,899.34 -2,693.90 2,357.53 Start 3.5'/100' DLS, -90.51 ° TF, for 276.81' 7,347.11 3,900.10 -2,726.85 2,632.04 Adjust TF to-98.69°, for 278.59' 7,625.70 3,904.64 -2,713.16 2,909.92 Hold for 791.42' 8,417.12 3,927.61 -2,607.96 3,693.98 Start 3'/100' DLS, 94.73' TF, for 221.99' 8,639.10 3,935.10 -2,591.25 3,915.09 Adjust TF to 99.59°, for 55.5' 8,694.60 3,937.36 -2,591.08 3,970.54 Hold for 2079.28' 10,773.88 4,027.20 -2,614.40 6,047.75 Start 2'/100' DLS,-78.84' TF, for 45.49' 10,819.37 4,029.10 -2,614.56 6,093.19 Adjust TF to-71.66°, for 124.09' 10,943.46 4,033.23 -2,611.47 6,217.17 Hold for 109.39' 11,052.85 4,036.13 -2,606.49 6,326.41 Start 2°/100' DLS,-91.33' TF, for 2418.58' 13,471.43 4,115.10 -1,548.71 8,420.47 Adjust TF to-96.69°, for 247.91' 13,719.33 4,124.99 -1,349.74 8,567.89 Hold for 100.61' 13,819.94 4,129.50 -1,266.49 8,624.20 Start 3'/100' DLS,-57.79' TF, for 160.43' 13,980.38 4,133.10 -1,130.56 8,709.25 Adjust TF to-57.54°, for 237.94' 14,218.32 4,125.15 -918.78 8,817.09 Hold for 232.78' 14,451.09 4,109.63 -706.55 8,911.44 Start 3*/100' DLS,-78.82' TF, for 117.48' 14,568.57 4,101.10 -598.11 8,955.77 Adjust TF to-71.46°, for 99.72' 14,668.29 4,092.45 -504.24 8,988.24 Hold for 254.02' 14,922.31 4,068.35 -263.27 9,064.91 Start Y/100' DLS,-105.04' TF, for 263.69' 15,186.00 4,048.10 -8.17 9,127.67 Adjust TF to-105.07°, for 270.33' 15,456.33 4,037.31 260.19 9,156.26 Hold for 1121.07' 16,577.39 4,013.51 1,380.20 9,198.68 Start 3.25°/100' DLS,-167.53' TF, for 38.34' 16,615.74 4,013.10 1,418.52 9,200.04 Adjust TF to-168.24°, for 291.57' 16,907.31 4,036.65 1,708.77 9,204.77 Hold for 114.14' 17,021.45 4,055.05 1,821.42 9,204.67 Start 3.25°/100' DLS, 0.3° TF, for 285.4' 17,306.85 4,078.10 2,105.57 9,204.56 Adjust TF to 90°, for 11.77' 17,318.63 4,078.10 2,117.35 9,204.59 Hold for 338.26' 17,656.89 4,078.10 2,455.60 9,206.85 TO: 17656.89' MD, 4078.1' TVD Checked By: Approved By: Date: 51312018 11:13:04AM Page 10 COMPASS 5000.14 Build 85 Pool Report o$o 7 6 6 N 5 O N ....... N O OOMO OOc'>00_e'i0 N U U U U U U U U U U U U U U U U O O O O C O 0 0 0 0 �m��nOOm OOn�rC�ltOn r MnMnM vvovvrivvav Q NJ w ¢a d O d O O 3 n�aa�a aa�aa�aaa¢aaa �a�n' 000marn0000 <n �n000 3300 000poao o ooao V t2n Rm2;! r2 o2 r rrrr HH���M�F-:r ter= a '°vec 'o 00000000 E� x22x2 xxxx22=Tsx S. J 00 V i N N O O MQ W t O 'O V i M O O N O m C) i� V O + O Lr) .�..i y W O 0000 C N O O N 0��0� ogs N a CL m�m�a aaaaaaa 3 a==3' mm my vmmyvmmgi dgil O :, r�UUUUU UUUUU4IUUUUUU i ', T '.. 00000 000000000000 vi vi vioo '�+immmmmei ci .-vi vi vi F .hwMM eeeeeeeeeee d i nrn £01. ooa n'omrn o000 o o 333o0o sbbssam�obsb' �� m���nh en�vn p,�E FHh-1=F FV-1-Ft=�F�f HRH; c1 zxxxxx xxxxxxxxxxx='.... _ � u co O O O O O O O O O O O O O O O O co It (uin}sn OMZ) (+)HIJO /(-)u}nos c� I I I 1 H-104wp23 Surface Location CPA� Coordinate Converter (� Datum: NA683 Region: alaska Datum: NA627 Region: jalaska rj C Latitude/Lon itude g 9 Decimal Degrees � � Latitude/Lon itude g 9� Decimal Degrees UTM Zone: —� - F South r UTM Zone: True r South i+- Skate Plane Zone: 4 Units: us ft r- State Plane Zone: 4 Units: us-ft • r Legal Description (NAD27 only) f Legal Description (NAD27 only) Starting Coordinates: - ----- -- - -- - - - - Ending Coordinates: X: 1689600.36 549568.736474514 Y: 15980534.24 Y: 5980782.43086254 ! i Transform Quit Help 1 H-104wp23 Surface Casing CPAI Coordinate Converter � d From: _.. To: _ Datum: INAD83 Region: alaska Datum: fRAD27 � Region: alaska C Latitude/Longitude pecimal Degrees t� C Latitude/Longitude Decimal Degrees r UTM Zone: � - F South r UTM Zone: True South +' Stake Plane Zone: 4 Units: us ft ; i Skate Plane Zone: �} Units: us ft C Legal Description (NAD27 only) Legal Description (NAD27 only) Starting Coordinates: ------ -- Ending Coordinates: - - --- --- 1689232.43 ? X: I 549200 810385368 s Y: 5980276.76 Y: 5980524.96388168 .. Transform Quit Help M 1 H-104w 23 Intermediate Casing P CPAI Coordinate Converter o From: _ _ .- _ __---- _ _ - -_. _ ._ _ ___ _ _ To: -..7_ . . Datum: NAD83 T Region: alaska Datum: NAD27 � Region: alaska ILatitude/Longitude Decimal Degrees j Latitude/Longitude Decimal Degrees -_ South r UTM Zone: r UTM Zone: True r South State Plane Zone: 4 Units: us fk �� State Plane Zone: 4 Units: us ft w Legal Description (NAD27 only) f Legal Description (NAD27 only] Starting Coordinates: _ .____ Ending Coordinates: X: f1691482 I X: f 551450.330376748 Y: 15977948 ! Y: 5978196.216381 44 ... .... Transform Quit Help 1 H-104wp23 Top of Production Horizon CPAs Coordinate Converter o 0- From: __ ._._ _.. _; To Datum: NAp83---wl Region: alaska j Datum: NAD27 Region: alaska Latitude/Longitude Decimal Degrees „ � ' Latitude/Lon etude 9 Decimal Degrees f t UTM Zone: F South i r UTM Zone: fTrue South i to- State Plane Zone: 4 � Units: us ft c`: State Plane Zone: 4 T Units: us Ft 4 Legal Description (NAD27 only) It Legal Description [NAD27 only] Starting Coordinates: Ending Coordinates: X: 1690361 j X: 550329.348949878 Y: 5978130 j Y: j 5978378.23318258 ... .... Transform Quit Help I H-104w 23 TD CPAf Coordinate Converter OLM, " From. Datum: J pA66 Region: jalaska Latitude/Longitude Decimal Degrees i ' UTM Zone: F South State Plane Zone: 4 Units: us-ft Legal Description (NAD27 only) Starting Coordinates: To: ----------------- Datum: HgD27 Region: alaska Latitude/Longitude Decimal Degrees t' UTM Zone: True r South f- State Plane Zone: 4 Units: us Fk j I— Legal Description (NAD27 only) -Ending Coordinates: X: 1698790 Y: 5983050 ..... Transform X: 558758.256835944 Y: 5983297.95674675� Quit I Help I I H-104wp23 Surface Location CPA[ Coordinate C,,,,rte, From: ------- Datum: FN —AD —83 Region: alaskaLatitudelLongitude lDecimal Degrees r UTM Zone: F South {- Stake Plane Zone: Units: Fu s-f -t:-] r Legal (NAD27 &-ity) Starting Coordinates: To: Datum: JNAD27 Region: pja�'�' Latitude/Longitude Decimal Degrees UTM Zone: TrueSouthSouth State Plane Zone: Units: 14 _Tj fus-ft Legal Description (NAD27 only) Legal Description ---- X: 11689600.36 Township: [0-12 f-N-'-,l Range: f—olo Y: 15980534.24 Meridian: ju t Section:1-28 JFNl- 5200-5597 FFEL F-72 .31441 L... k .......... . . ........ iHelp ..... . .. Transform.. Qut :1 ..................... ; IH-104wp23 Surface Casing CPAI Coordinate Converter Datum: INAD63 Region: J,Iaska Latitude/Longitude IDecimal Degrees UTM Zone: South (o State Plane Zone: 14 Units: fus-fl: -1 Leqal De,<.cnpbon I.NAD27 onI-,,,.l Starting Coordinates: X: 11689232.43 Y: 15980276W To: Datum: INAD27 _7j Region: faa-lask—a--,j r Latitude/Longitude IDecimal Degrees r UTM Zone: f—True South r State Plane Zone: Units: 14 us-ft r* Legal Description (NAD27 only) - Legal Township: 0-12FN--,-1 Range: jolo t '- I i-ZJ Meridian: Section:133 JFNL 1-76.-62-5-81 IFEL 1142-5333 ..................... Transform Quik Help .......... 1 H-104wp23 Intermediate Casing F-�} CPAI Coordinate Conve 1p^°� i Datum: NAD83 Region: alaska -. Datum: NAD27 Region: alaska t Latitude/Longitude IDecimalDegrees r Latitude/Longitude Decimal Degrees +, UTM Zone:" South t UTM Zone: True South i State Plane Zone: 4 Units: us ft + ? State Plane Zone: F4 Units: lus-ft + Le . l C:E r_:ri�etictt I.i1, Civet or,14.g 3 t-' Legal Description (NAD27 only) Starting Coordinates: Legal Description X: 11691482 ; Township: 012 N + Range: 010 IL + Y597794$ Meridian: Fu -7D Section: �4 FNL 2519.6705 FEL + 4193.4532 i .... Transform '• Quit Help 1 H-104wp23 Top of Production Horizon CPAI Coordinate Converter � From. To: ------- Datum: NAD83 + Region: alaska T gg I Datum: NAD27 + Region: alaska + t- LatitudelLongitude Decimal Degrees - Latitude/Longitude Decimal Degrees r UTM Zone: (" South E UTM Zone: True � South ; C* State Plane Zone: 4 �+ Units: us ft + Skate Plane Zone: 14 +1 Units: us-ft + r Leg,=il De_ofiption (t,,, D27 onl!rj Legal Description (NAD27 only] Starting Coordinates: - --- - -� 1690361 L f Legal Description- — — Township: 012 N + Range: 010 E + Y: 5978130 � Meridian: JU+ Section:33 _. FNL +1 12330.0321 IFEL 13E894349 .... Transform Quit Help I H-104wp23 TD CPAR C,ordlint, C,n,,,t,, From: Datum: NAD83 Region: lalaska Latitude/Longitude DecimalDegrees t- UTM Zone: F South C- Skate Plane Zone: F Units: fus —ft r Legal De riptirjn (NAD-97 onLtlj Starting Coordinates: - X: irl .9096 Y: 19983050 Datum: rNA_D2_7_'__,I Region: Latitude/Longitude Decimal Degrees r UTM Zone: uue r South r State Plane Zone: q Units: us it f-- Legal Description (NAD27 only) Legal Description Township: fo 1-2 fN--",-1 Range: ro—jo f-E—,-1 Meridian: Section:, 2-6 JFNL I 2751-3389 FFEL 212-0.627-0 .......... ­ * ............. ; Transform _11 Quit H elp1 ................................ 111, As -built REVI DATE IBY ICK IAPPI DESCRIPTION IREVI DATE IBYICK APP DESCRIPTION 1 2/05/0 MRT I CC I I Rev. Per K05014ACS 1 2 02/01/1 JAH I LGM Rev. Per K170005ACS N 25 29 28 27 25 zG 36 J31 KCS32 33 34 35 1 s5 T12N 10E F11NR OE 5 4 3 2 i 6 1 0120 it X1,P. i - - -- -- ASP GRID NORTH 0119 CPFI u . �C 0118 a 12 0117 _ �0 0116 0115 18 17 1s 15 14 13 0114 rg LEGEND 0113 - ID -LL 24 0112 �i 20 21 2 23 0 AS —BUILT CONDUCTOR 0111 o110 VICINITY MAP • EXISTING CONDUCTOR 0109 SCALE: 1" = 2 MILES 0104 0108 0103 28 27 + _ — �1-�� ---- 33 34 0102 0106 0101 DS1 H •20 •19 •22 •17 •16 015 •1 •2 •3 •UGNU 01 •14 •5 •12 •11 •10 •6 •21 •13 •9 •7 •18 NOTES: 1. BASIS OF LOCATION AND ELEV. IS DS1H MONUMENTATION PER LOUNSBURY & ASSOC. 2. COORDINATES SHOWN ARE ALASKA STATE PLANE, ZONE 4, N.A.D. 27, AND GEODETIC COORDINATES ARE NAD 27. 3. ELEVATIONS ARE B.P.M.S.L. 4. ALL CONDUCTORS ARE LOCATED WITHIN PROTRACTED SECTIONS 28 AND 33, TOWNSHIP 12 NORTH, RANGE 10 EAST, UMIAT MERIDIAN, ALASKA. 5. DATES OF SURVEY: 12-26-16 THRU 1-31-17 FIELD BOOKS L16-35, L16-40, L17-02 & L17-03. 6. ALL DISTANCES SHOWN ARE GROUND. GRAPHIC SCALE 0 100 200 400 •g LSHEET 1 inch = 200 ft. & 3 FOR COORDINATE TABLE LOUNSBURY & ASSOCIATES, INC. SURVEYORS ENGINEERS PLANNERS AREA:IH MODULE: XXXX UNIT: D1 ConocoPhillips DS1H WELL CONDUCTOR Alaska, Inc. ASBUILT LOCATIONS CADD FILE NO. DRAWING NO. PART: REV: LK6108d31 2 05 05 CEA—D1HX-6108D31 1 of 3 2 1 1 12/05/051 MRT I CC I I Rev. Per K05014ACS 1 2 102/01/171 JAH I LGM I I Rev. Per K170005ACS CONDUCTORS ARE LOCATED IN PROTRACTED SECTION 33, T. 12 N., R. 10 E., UMIAT MERIDIAN Well No. NAD 27 ASP Coordinates NAD 27 Geographic Coordinates Section Offset. Elev. Y X Lat. Long. F.N.L F.E.L O.G. PAD 1 5,979,969.32' 549,197.55' N 70* 21' 21.836" W 149' 36' 01.664" 732' 1151' 49.9' 54.4' 2 5,979,939.43' 549,199.75' N 70' 21' 21.542" W 149' 36' 01.605" 762' 1149' 49.8' 54.2' 3 5,979,909.70' 549,201.04' N 70' 21' 21.249" W 149' 36' 01.573" 791' 1148' N/A N/A 4 5,979,789.20' 549,210.20' N 70' 21' 20.064" W 149' 36' 01.328" 911' 1140' N/A N/A 5 5,980,174.54' 549,543.27' N 70' 21' 23.832" W 149' 35' 51.517" 528' 803' N/A N/A 6 5,980,054.85' 549,551.90' N 70' 21' 22.654" W 149' 35' 51.288" 648' 796' N/A N/A 7 5,979,935.13' 549,560.55' N 70' 21' 21.476" W 149' 35' 51.058" 768' 788' N/A N/A 8 5,979,815.46' 549,569.18' N 70' 21' 20.299" W 149' 35' 50.829" 888' 781' N/A N/A 9 5,979,964.85' 549,559.64' N 70' 21' 21.769" W 149' 35' 51.079" 738' 789, 50.2' 54.6' 10 5,980,084.49' 549,550.97' N 70' 21' 22.946" W 149' 35' 51.309" 619' 796' 50.3' 54.4' 11 5,980,114.39' 549,548.80' N 70' 21' 23.240" W 149' 35' 51.367" 589' 798' 50.4' 54.3' 12 5,980,144.15' 549,546.49' N 70' 21' 23.533" W 149' 35' 51.428" 559' 800' 50.3' 54.3' 13 5,979,993.93' 549,557.42' N 70' 21' 22.055" W 149' 35' 51.138" 709' 791' 50.3' 54.4' 14 5,980,204.14' 549,542.05' N 70' 21' 24.123" W 149' 35' 51.547" 499' 804' 50.1' 54.2' 15 5,979,999.18' 549,195.34' N 70' 21' 22.130" W 149' 36' 01.722" 702' 1153' 50.0' 54.5' 16 5,980,029.08' 549,192.10' N 70' 21' 22.424" W 149' 36' 01.811" 671' 1156' N/A N/A 17 5, 980, 058.86' 549,191.00' N 70' 21' 22.717" W 149' 36' 01.838" 642' 1156' 49.7' 54.4' 18 5,979,904.84' 549,564.14' N 70* 21' 21.178" W 149' 35' 50.959" 799' 785' 50.4' 54.5' 19 5,980,118.88' 549,186.59' N 70' 21' 23.308" W 149' 36' 01.955" 582' 1160' 49.5' 54.6' 20 5,980,148.10' 549,183.14' N 70' 21' 23.595" W 149' 36' 02.050" 552' 1164, N/A N/A 21 5,980,024.57' 549,555.22' N 70' 21' 22.356" W 149' 35' 51.196" 679, 793' 50.2' 54.4, 22 5,980,089.04' 549,188.93' N 70' 21' 23.014" W 149' 36' 01.893" 612' 1158' 49.6' 54.7' UGNU 01 5,980,234.12' 549,542.20' N 70' 21' 24.418" W 149' 35' 51.536" 469' 804' 50.0' 54.1' *101 5,980,602.66' 549,581.92' N 70' 21' 28.040" W 149' 35' 50.304" 101' 761' 48.0' 54.0' *102 5,980,662.56' 549,577.46' N 70' 21' 28.630" W 149' 35' 50.423" 41' 765, 48.0' 54.0' *106 5,980,632.86' 549,579.90' N 70' 21' 28.337" W 149' 35' 50.357" 70' 762' 48.0' 54.0' *107 5,980,692.31' 549,575.52' N 70' 21' 28.922" 1 W 149' 35' 50.474" 11' 766' 48.0' 1 54.0' * CONDUCTOR ASBUILT THIS SURVEY ConocoPhilli s p Alaska, Inc. CADD FILE NO. LK6108d31 LOUNSBURY & ASSOCUTES, INC. SURVEYORS ENGINEERS PLANNERS AREA:IH MODULE: XXXX UNIT: D1 DS1 H WELL CONDUCTOR ASBUILT LOCATIONS PART: REV: CEA-D1 HX-6108D31 2 of 3 2 11 102/01/11 JAH I LGM I lCreate Per K170005ACS CONDUCTORS ARE LOCATED IN PROTRACTED SECTION 28, T. 12 N.. R. 10 E., UMIAT MERIDIAN Well No. NAD 27 ASP Coordinates NAD 27 Geographic Coordinates Section Offset. Elev. Y X Lat. Long. F.S.L F.E.L. O.G. PAD *103 1 5,980,722.55' 549,573.20' N 70' 21' 29.220" W 149' 35' 50.536" 19' 768' 48.0' 54.1' *104 5,980,782.43' 549,568.74' N 70' 21' 29.809" W 149' 35' 50.655" 79' 772' 48.0' 54.1' *108 5,980,752.52' 549,570.98' N 70' 21' 29.515" W 149' 35' 50.595" 49' 770' 48.0' 54.0' *109 5,980,812.20' 549,566.50' N 70' 21' 30.102" W 149' 35' 50.714" 109' 774' 48.0' 54.0' *110 5,980,842.21' 549,564.40' N 70' 21' 30.398" W 149' 35' 50.770" 139' 776' 48.0' 54.0' *111 5,980,872.05' 549,562.21' N 70' 21' 30.691" W 149' 35' 50.828" 169' 778' 48.0' 54.1' *112 5,980,902.08' 549,559.94' N 70' 21' 30.987" W 149' 35' 50.889" 199' 780' 48.0' 54.0' *113 5,980,932.00' 549,557.76' N 70' 21' 31.281" W 149' 35' 50.947" 229' 782, 48.0' 54.0' *114 5,980,961.86' 549,555.50' N 70' 21' 31.575" W 149' 35' 51.006" 259' 784' 48.0' 54.1' *115 5,980,991.68' 549,553.43' N 70' 21' 31.868" W 149' 35' 51.062" 289' 786' 48.0' 54.1' *116 5,981,021.61' 549,551.58' N 70' 21' 32.163" W 149' 35' 51.110" 319' 787' 48.0' 54.1' *117 5,981,051.73' 549,548.80' N 70' 21' 32.459" W 149' 35' 51.185" 349' 790' 48.0, 54.0' *118 5,981,081.22' 549,546.95' N 70' 21' 32.750" W 149' 35' 51.234" 378' 791' 48.0' 54.0' *119 5,981,111.42' 549,544.52' N 70' 21' 33.047" W 149' 35' 51.299" 408' 794' 48.0, 54.2' *120 5,981,141.33' 549,542.48' N 70' 21' 33.341" W 149' 35' 51.353" 438' 795' 48.0' 54.1' * CONDUCTOR ASBUILT THIS SURVEY • OF =••APE"'qS'�4�i� SURVEYOR'S CERTIFICATE Ar 49th 1 HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ................................................. ............................................ ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY %''"""""""""�"� ? JEREMIAH F. CORNELL: DONE BY ME OR UNDER MY DIRECT SUPERVISION AND moo: THAT ALL DIMENSIONS AND OTHER DETAILS PER THIS REVISION J'�'•. LS-12663 .•' J�"Ar ARE CORRECT AS OF JANUARY 31, 2017. .•'� ��jeFo A .............••' Pia:••• LOUNSBURY IN `���••• SC. UUR`VEYOARSSSOCIATES ENGINEERS LANNERS AREA:IH MODULE: XXXX UNIT: D1 ConocoPhillips DS1H WELL CONDUCTOR Alaska, Inc. ASBUILT LOCATIONS CADD FILE NO. LK6108d31 12 27 1s DRAWING NO. 1 CEA-D1HX-6108D31 PART: 1 3 OF 3 REV: 1 1 Fixed BOP configuration for West Sak Operations Tc t_a:e: 4 --*1191X)IINX)ble�,t� C is 01 l 3 1H-104 Drilling Hazards Summary 13-1/2" Open Hole / 10-3/4" Casing Interval Hazard Risk Level Mitigation Strategy Broach of Conductor Low Monitor cellar continuously during interval. Gas Hydrates Moderate ' Reduced pump rates, Reduced drilling fluid temperatures, Additions of ScreenKleen Running Sands and Gravels Low Maintain planned mud parameters, Increase mud weight, use weighted sweeps. Hole swabbing on trips Moderate Trip speeds, proper hole filling (use of trip sheets), pumping out Washouts / Hole Sloughing Low Cool mud temperatures, minimize circulating times when possible Anti -Collision Moderate Follow real time surveys very closely, shut in nearby wells that we have collision concerns with, gyro survey to ensure survey accuracy. 9-7/8" Open Hole / 7-5/8" Casing Interval Hazard Risk Level Mitigation Strategy Running Sands and Gravels Low Maintain planned mud parameters, increase mud weight, use weighted sweeps. Stuck Pipe Low Good hole cleaning, pre-treatment with lost circulation material, stabilized BHA, decreased mud weight. Abnormal Reservoir Pressure Low BOP training and drills, increased mud weight. Lost circulation Moderate Reduced pump rates, mud rheology, LCM. Hole swabbing on trips Moderate Trip speeds, proper hole filling (use of trip sheets), pumping out. 6-3/4" Open Hole / 4-1/2" Liner Intervals Hazard Risk Level Mitigation Strategy Abnormal Reservoir Pressure Low Stripping drills, shut-in drills, increased mud weight. Stuck Pipe Low Good hole cleaning, PWD tools monitoring and analysis, decreased mud weight if possible if pipe does get stuck. Lost Circulation Moderate Reduced pump rates, mud rheology, LCM program, additional fluid • stored on location during completion run. Differential Sticking Moderate Follow mud program, keep pipe moving when able. Hole Swabbing on Trips Moderate Trip speeds, proper hole filling (use of trip sheets), pumping out or backreamin . Fault Crossings and Concretions Moderate Use developed best practices for concretion drilling. Anti -Collision Moderate Follow real time surveys very closely, shut in nearby wells that we have collision concerns with. Utilize periscope to maintain geological certainty to stay within zone. Casing wear Moderate Maintain low dog legs in the surface interval and utilize super sliders for drilling, milling, and liner running operations to minimize casing wear. Consider logging casing thickness to calibrate casing wear model. Getting Liner to Bottom Moderate Properly clean hole on the trip out with the BHA, perform clean out run if necessary, utilize super sliders for weight transfer, monitor torque and drag. Whipstock Retrieval Moderate A dedicated clean out run prior to attempting to pull whipstock can be used to reduce the risk of fishing operations. 1H-104 Drilling Hazards Summary.doc 511512018 4:42:08 PM c� z Q 0 � s 0 N Q o a n _ � U U W � J F— W Y J r m Z {n U Q rFF I ,aQ io�l�me U 4�. G01-Xl 1IY1 . . 201-XI if3r 014-XI t�Itltill l[i�1 11111111 zittill 1[YI cii-Nl fur. _ � 111-NI fur. LI1-HI ,lliMN � J g � f ozrxi mr b m ■� Q Remark: INPUT Geographic, NAD27 AOGCC PTD 218-061 18 May 2018 KRU 1 H-104 Latitude: 70 21 29.80900 Longitude: 149 35 50.65500 OUTPUT State Plane, NAD27 5004 -Alaska 4, U.S. Feet Northing/Y: 5980782 .397 Easting/X: 549568.722 Convergence: 0 22 45.01443 Scale Factor: 0. 999902791 Corpscon v6.0.1, U.S. Army Corps of Engineers TRANSMITTAL LETTER CHECKLIST WELL NAME: Afed /'W /t> 7 PTD: V/ Development Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: �f,� 40— /crfv� 'A POOL: ��� e= (C I Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -� from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, WEST SAK OIL - 490150 PTD#: 2180610 Company CONOCOPHILLIPS ALASKA. INC. Initial Class/Type Well Name: KUPARUK RIV U WSAK 1H-104 Program DEV Well bore seg ❑ DEV / PEND GeoArea 890 Unit 11160 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven, gas conforms to AS31.05.030(j.1-.A),(j.2.A-D) NA 1 Permit fee attached NA 2 Lease number appropriate Yes Surf Loc & Top Prodlnt -lie in-ADL0025639; TD lies in ADL0025638. 3 Unique well name and number Yes A Well located in -a defined pool - Yes Kuparuk River, West Salk Oil Pool - 490150, governed by CO 406C 5 Well located proper distance from drilling unitboundaryYes CO 406C, Rule 3: no restrictions as to well spacing except that no pay shall be opened in a well closer 6 Welllocatedproper distance from other wells Yes than 500 feet to an externalpropertyline where ownership or landownership changes. 7 Sufficient acreage available in drilling unit Yes Well is more than 500 feet from an external property line. 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate_ bond in force Yes Appr Date 11 Permit can be issued without conservation order Yes SFD 5/18/2018 12 Permit can be issued without administrative approval Yes 13 Can permit be approved before 15-day wait - - - - Yes 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For: NA 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre -produced injector: duration of pre -production less than 3 months (For service well only) NA 18 Conductor string provided Yes 80' conductor set Engineering 19 Surface casing protects all known USDWs Yes Surface casing shoe at 1892' MD 20 CMT vol adequate to circulate on conductor & surf csg Yes 217% excess cement 21 CMT vol adequate to tie-in long string to surf csg No 22 CMT will cover all known productive horizons No Productive interval will be completed with uncemented slotted liner 23 Casing designs adequate for C, T, B &_ permafrost Yes 24 Adequate tankage or reserve pit Yes Rig has steel tanks; all waste to approved disposal wells 25 If a re -drill, has a 10-403 for abandonment been approved NA 26 Adequate wellbore separation proposed Yes Anti -collision analysis complete; no major risk failures 127 If-diverter required, does it meet regulations - - Yes Diverter size and route meet regulation - Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Max formation pressure is 1724 psig(8.6 ppg EMW); will drill w/ 8.8-9.5 ppg EMW VTL 5/31/2018 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to -(put psig in comments) Yes MPSP is 1339 psig; will test BOPs to 3500 psig 131 Choke manifold complies w/API RP-53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S measures required 34 Mechanical condition of wells within AOR verified (Forservicewell only) NA 35 Permit_can be issued w/o hydrogen sulfide measures No H2S measures required._ Well 1H-102 measured 20 ppm_ H2S on November 20, 2017. - - Geology 36 Datapresentedon potential overpressure zones Yes Expected res. pressure is —8.4 ppg EMW; production int will be drilled with 8.8 - 9.5 ppg mud. Appr Date �37 Seismic analysis of shallow gas zones NA No shallow gas expected. Some risk of encountering gas hydrates while drilling surface hole. SFD 5/18/2018 38 Seabed condition survey (if off -shore) NA Mitigation measures discussed in Drilling Hazards Summary. 39 Contact name/phone for weekly progress reports [exploratory only] - NA_ Geologic Engineering Pu Commissioner: Date: Commissioner. ate C mis ' er Da e