Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout218-064Carlisle, Samantha J (DOA) From: Rixse, Melvin G (DOA) Sent: Thursday, June 28, 2018 12:03 PM To: Carlisle, Samantha J (DOA) Subject: FW: PTD 218-061 (lH-104) / 218-062 (1H-104L1) / 218-063 (lH-104L2) / 218-064 (lH-104L3) / 218-065 (lH-104L4) Sam, Do I forward this to you? Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-223-3605 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixsenalaska.pov). From: Brunswick, Scott A [mailto:Scott.A.Brunswick@conocophillips.com] Sent: Thursday, June 28, 2018 11:20 AM To: Rixse, Melvin G (DOA) <melvin.rixse@alaska.gov> Cc: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov>; Lehman, Nick R <Nick.R.Lehman @conocophillips.com>; Rohlfing, Jenaya J<Jenaya.J.Rohlfing@conocophillips.com>; Woodard, Madeline E <Madeline.E.Woodard@conocophillips.com>; Shumway, Kelsey <Kelsey.Shumway@conocophillips.com> Subject: PTD 218-061 (11-1-104) / 218-062 (1H-104L1) / 218-063 (1H-104L2) / 218-064 (1H-104L3) / 218-065 (11-1-1041-4) Mel ConocoPhillips would like to rescind the PTD for the following wells with their corresponding approved PTD numbers: 1H-104: 218-061 1H-104L1: 218-062 1H-104L2: 218-063 11-1-1040: 218-064 1H-104L4: 218-065 Wet sand were found while drilling the 11-1-108 injector, a subsequent pilot hole was drilled that gave further information to move the landing point for the 1H-104 producer. We will be repurposing the 1H-108 surface casing string to drill the 11-1-104 targets at a future time and will send new permit packs to the AOGCC for that project when finalized. Regards Scott Brunswick THE STATE 040"Awl 1W.&M I GOVERNOR BILL WALKER G. Alvord Alaska Drilling Manager ConocoPhillips Alaska, Inc. P.O Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Re: Kuparuk River Field, West Sak Oil Pool, KRU 1H-104L3 ConocoPhillips Alaska, Inc. Permit to Drill Number: 218-064 Surface Location: 5200.56' FNL, 772.31' FEL, SEC. 28, T12N, RIOE, UM Bottomhole Location: 2966.4V FNL, 2111.92' FEL, SEC. 26, T12N, RIOE, UM Dear Mr. Alvord: Enclosed is the approved application for the permit to drill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 218-061, API No. 50-029-23606-00- 00. Production should continue to be reported as a function of the original API number stated above. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Hollis S. French l Chair DATED this day of June, 2018. s - J STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MAY 9 P WIIR PERMIT TO DRILL 20 AAC 25.005 1 a. Type of Work: 1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1 c. Specify if well is proposed for: Drill A& Lateral Stratigraphic Test ❑ Development - Oil Q • Service - Winj ❑ Single Zone ❑ • Coalbed Gas ❑ Gas Hydrates ❑ Redrill n Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket Q , Single Well ❑ 11. Well Name and Number: ConocoPhillips Bond No. 59-52-180 • KRU 1 H-104L3 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 17532' TVD: 3908' Kuparuk River Field West Sak Oil Pool , 4a. Location of Well (Governmental Section): 7. Property Designation: Surface: 5200.56' FNL, 772.31' FEL, Sec 28, T 12N, R010E, UM ADL025639 & ADL025638 Top of Productive Horizon: 8. DNR Approval Number: 13. Approximate Spud Date: 2330.03' FNL, 32.89' FEL, Sec 33, T 12N, R01OE, UM 80-261 & 931695000 7/4/2018 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 2966.41' FNL, 2111.92' FEL, Sec 26, T 12N, R010E, UM 2560 & 2560 2966' to ADL025637 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 93.1' 15. Distance to Nearest Well Open Surface: x- 549568.74 y- 5980782.43 . Zone- 4 GL / BF Elevation above MSL (ft): 54.1' to Same Pool: 90' to 1 H-01 16. Deviated wells: Kickoff depth: 5757 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 95 degrees Downhole: 1640 psi Surface: 1274 psi 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42" 20" 94# H-40 Welded 80' Surface Surface 118' 118' Existing, cement to surface 13-1/2" 10-3/4" 45.5# L-80 Hyd 563 1892' Surface Surface 1892' 1800' 966 sx 11.0 Lead, 201 sx 12.0 Tail 9-7/8" 7-5/8" 29.7# L-80 Hyd 563 6565' Surface Surface 6565' 3855' 871 sx 15.8 Class G 6-3/4" 4-1/2" 12.6# L-80 IBTM/TXPM 11775 5757' 3668' 17532' 3908' N/A: Un-cemented slotted liner 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Hydraulic Fracture planned? Yes ❑ No Q ' 20. Attachments: Property Plat ❑ BOP Sketch M, Drilling Program Time v. Depth Plot Shallow Hazard Analysis Diverter Sketch Seabed Report Drilling Fluid Program 20 AAC 25.050 requirements 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be Madeline Woodard .,w, II deviated from without prior written approval. NkVv Contact Name: Authorized Name: G. Alvord Contact Email: madeline.e.woodard CO .com Authorized Title: Alaska Drilling Contact Phone: 1-907-265-6086 �Ma�nager Authorized Signature: A eeA4 Date: S*-7 (2.. f (j 11 Commission Use Only Permit to Drill / �/ 2l�% API Number:rmit l ��lhC.�v - V Pepproval A See cover letter for other Number: 50-V Z� Date: requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane gas hydrates, or gas contained in shales: [ / Other: QU n 1 1 ? J7GD s l q Samples req'd: Yes ❑/ No[� Mud log req'd: Yes❑ No[� r c k'Ch t�Y �JS a H�S,)n�sure fYes [t� No( ] Directional svy req'd: Yes �No ❑ SRa rig exceptio d: es ❑ No -,�( Inclination -only svy req'd: Yes ❑ No[j q , %� W a % w � / u eZ" 5J ��rl'p� r 1/ e-r Post initial injection MIT req'd: Yes ❑ No® AD E7 cc - firrrn rc f a fi10 c 0,lid /1:) 0 5 Jo re�-� svb trr' APPROVED BY / lit I Approved by: COMMISSIONER THE COMMISSION Date: v t�i VL &111l J0 Submit Form and Form 10-401 Revised 5/2 17 This permit is vali o s r hA f approval per 20 AAC 25.005(g) Attachments in Duplicate '�1` � Application for Permit to Drill, Well 1 H-1041-3 Saved: 17-May-18 Post Office Box 100360 Anchorage, Alaska 99510-0360 Phone (907) 265-6086 Email: madeline.e.woodard@conocophillil)s.com May 16, 2018 Alaska Oil and Gas Conservation Commission 333 West 71 Avenue, Suite 100 Anchorage, Alaska 99501 Re: Application for Permit to Drill, West Sak Producer, 1 H-104L3 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby applies for a permit to drill a grass roots onshore producer, a penta-lateral horizontal well in the West Sak A2, A3, A4, B and D sands. The expected spud date for this well is July 4, 2018. It is planned to use rig Doyon 142. A 13-1/2" surface hole will be drilled on diverter & 10-3/4" surface casing will be run to total depth and cemented to surface. The remaining intervals will utilize Doyon 142's 13-5/8" x 5000 psi BOP stack with required ram installations and tested on a 14 day cycle in accordance with COP and AOGCC policy. The intermediate hole section will drill a 9- 7/8" hole with 7-5/8" casing run to total depth & cemented in place. The first 1H-104 6-3/4" production lateral will be geo-steered in the West Sak A2 sand and lined with 4-1/2" slotted liner. The subsequent production laterals will again be drilled with 6-3/4" hole and lined with 4-1/2" slotted liner in the following order: West Sak A3, A4, B and D sand. A separate PTD application will be submitted for each lateral: 1H-104, 1H-104L1, 1H-104L2, 1H-104L3, and 1H-104L4 laterals. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 Application for Permit to Drill per 20 ACC 25.005 (a). 2. Pressure information as required by 20 ACC 25.035 (d) (2). 3. Casing and Cementing program. 4. A drilling fluids program summary. 5. A proposed drilling program. 6. Directional drilling/collision avoidance information as required by 20 ACC 25.050 (b). 7. A proposed completion diagram. Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information, please contact Madeline Woodard at 265-6086 (madeline.e.woodard(&conocophillips.com) or Chip Alvord at 265-6120. Sincerely, Ja ehne Woodard Drilling Engineer Application for Permit to Drill Document Kuparuk Well 1 H-1041-3 Well Name Requirements of 20 AAC 25.005 (f) The well for which this application is submitted will be designated as KRU 1H-104L3 Location Summary Requirements of 20 AAC 25.005(c)(2) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (2) a plat identifying the property and the property's owners and showing (A)the coordinates of the proposed location of the well at the surface, at the top of each objective formation, and at total depth, referenced to governmental section lines. (B) the coordinates of the proposed location of the well at the surface, referenced to the state plane coordinate system for this state as maintained by the National Geodetic Surrey in the National Oceanic and Annospheric Administration: (C) the proposed depth of the well at the top of each objective formation and at total depth: Location at Surface 5200.56' FNL, 772.3 F FEL, Sec 28, T 12N, RO I OE, UM NGS Coordinates Northings: 5980782.43' Eastings: 549568.74' IRKB Elevation 93.1' AMSL Pad Elevation 54.1' AMSL Location at Surface Casing 175.63' FNL, 1142.53' FEL, Sec 33, T12N, R010E, UM NGS Coordinates Northings: 5980524.96' Eastings: 549200.81 ' Measured Depth, RKB: 1892' Total Vertical Depth, RKB: 1800, Total Vertical Depth, SS: 1707' Location at Intermediate Casing 2388.38' FNL, 4968.34' FEL, Sec 34, T12N, R010E, UM NGS Coordinates Northings: 5978322.21 ' Eastings: 550674.37' Measured Depth, RKB: 5757' Total Vertical Depth, RKB: 3668' Total Vertical Depth, SS: 3575' Location at Total Depth 2966.41' FNL, 2111.92' FEL, Sec 26, T 12N, ROIOE, UM NGS Coordinates Northings: 5983082.96' Eastings: 558768.26' Measured Depth, RKB: 17532' Total Vertical Depth, RKB: 3908' Total Vertical Depth, SS: 3815' and (D) other information required by 20 AAC 25.050(b): Requirements of 20 AAC 25.050(b) If a well is to be intentionally deviated, the application for a Permit to Drill (Form 10-401) must (1) include a plat, drawn to a suitable scale, showing the path of the proposed wellbore, including all adjacent wellbores within 200 feel of any portion of the proposed well: Please see Attachment: Directional Plan And (2) for all wells within 200 feet of the proposed wellbore (A) list the names of the operators of those wells, to the extent that those names are known or discoverable in public records, and show that each named operator has been furnished a copy of the application by certified mail,- or (B) state that the applicant is the only affected owner. The Applicant is the only affected owner. Blowout Prevention Equipment Information Requirements of 20 AAC 25.005(c)(3) An application for a Permit to Drill must be accompanied by each of the following itents, exceptfor an item already on file with the commission and identified in the application: (3) a diagram and description of the blowout prevention equipment (BOPS) as required by 20 AAC 25.035. 20 AAC 25.036, or 20 AAC 25.037, as applicable; Please reference BOP schematics on file for Doyon 142 & within this PTD application. Due to lower reservoir pressure in the West Sak a fixed stack ram placement will be utilized to fulfill all barrier requirements during well construction operations, graphic attached. Drilling Hazards Information Requirements of 20 AAC 25.005 (c)(4) An application for a Permit to Drill must be accompanied by each of the following itents, exceptfor an item already on file with the commission and identified in the application: (4) information on drilling hazards, including (A) the maxintunt downhole pressure that may be encountered, criteria used to determine it, and maximum potential surface pressure based on a methane gradient; The maximum potential surface pressure (MPSP) while drilling 1H-104 is calculated using an estimated maximum reservoir pressure of 1640 psi (based on 1 H;,�pressure at a 4005.2' TVD reference datum), a gas gradient of 0.10 psi/ft, and the estimated depth of the West Sak B sand at 3668' TVD: B Sand Estimated. BHP = 1,640 psi B Sand estimated depth = 3,668' TVD Gas Gradient = 0.10 psi/ft as per 20 AAC 25.005 (c)(4)(A) Hydrostatic of full gas column = 366 psi (3,668' TVD * 0.10 psi/ft) MPSP = BHP — gas column = 1,274 psi (1,640 psi — 366 psi) (B) data on potential gas _ones: The wellbore is not expected to penetrate any shallow gas zones. And (C) data concerning potential causes of hole problems such as abnormally geo-pressured strata, lost circulation _ones, and::ones that have a propensity for differential sticking: See attached 1H-104L3 Drilling Hazards Summary Requirements of 20 AAC 25.005 (c)(5) An application for a Permit to Drill must be accompanied by each of the following items, except for• an item already on file with the commission and identified in the application: (5) a description of the procedure for conducting formation integrity tests, as required under 20 AAC 25.030(f); A procedure is on file with the commission for performing FIT/LOT's. The FIT/LOT will be performed on the motherbore of the 1H-104 penta-lateral well (1H-104). ConocoPhillips requests a waiver on subsequent laterals FIT/LOT (1H-104L1, 1H-104L2, 1H-104L3, & 1H-104L4). Waiving the upper lateral FIT/LOT may be undertaken if the following criteria are met: 1. Primary cement job pumped as per design with no issues. 2. WellView cement report submitted to AOGCC for review of job before 2nd lateral is drilled (1H-104L1). 3. No abnormal pressure is discovered while drilling the motherbore well (lowest lateral). 4. Kill weight fluid is confirmed using a static flow check at the shoe for 30 minutes post TD of the 1H-104 motherbore. If any of the above -mentioned criteria are not met, performing an FIT/LOT of the upper laterals will be undertaken. Casing and Cementing Program Requirements 2f 20 AAC 25.005(c)(6) An application fora Pernut to Drill must be accompanied by each gl the following items, except for an item already on file with the commission and identified in the application: (6) a complete proposed casing and cementing program as required by 20 AAC 25.030, and a description of any slotted liner, pre -perforated liner, at - screen to be installed Casing and Cement Program Hole Csg Weight Grade Coupling Length MD TVD MD TVD Cement Quanti 42" 20" 94# H-40 Welded 80 Surf Surf 80 80 Existing, cement to surface 13.5" 10.75" 45.59 L-80 H563 1892 Surf Surf 1892 1800 966 sx 11.0 Lead, 201 sx 12.0 Tail 9.875" 7.625" 29.7# L-80 H563 6565 Surf Surf 6565 3855 871 sx 15.8 Class G 6.75" 4.5" 12.6# L-80 IBTM / 11775 5757 3668 17532 3908 Un- TXPM Cemented Liner 1H-104 Cement Calculations Hole Size ft (TOC) ft (Bottom) OD ID ppf Conductor Depth: 42 39 80 20 19.124 94 Surface Casing Depth: 13.5 39 1892 10.75 9.95 45.5 Intermediate Casing Depth: 9.875 2883 6565 7.625 6.875 29.7 Surface Cement: Surface to 1,850' MD Capacities Lead 1.91 ft3/ sx of 11.0 ppg LiteCRETE ft3/ sx of 12.0 Tail 1.65 DeepCRETE OH 0.177044881 Permafrost (PF) depth 1715 ft 13-1/2" x 10-3/4" 0.064782883 XS% Lead 275 % 20" x 10-3/4" 0.243020085 XS% Tail 50 % 10-3/4" 0.096174956 Tail Cement Length 500 ft 500 x 0.065 x 1.5 48.6 Shoe Track 80 ft 80 x 0.096 x 1 7.7 Open Hole 10 x 0.177 x 1.5 2.7 Total 59 bbl 331 ft3 201 sx Lead Top Tail Cement to Conductor 1273 ft 1273 x 0.065 x 3.75 309.3 bbl Conductor Length 80 ft 80 x 0.243 19.4 bbl Total: 329 bbl 1845 ft3 966 sx Intermediate Cement: Cement from 6,565' MD to 2,883' MD Capacities: Slurry: 15.8ppg Class G yielding 1.16ft^3/sk 9-7/8" x 7-5/8" 0.038250437 XS% for open hole and annulus: 25% 9-7/8" OH 0.094730547 7-5/8" ST 0.045915703 Annulus Cement 3682 x 0.038 x 1.25 176.05 bbls Rathole Cement 2 x 0.095 x 1.25 0.24 bbls Shoe Track 80 x 0.046 x 1 3.67 bbls Total 180 bbls 1010 ft3 871 sx Diverter System Information Requirements of 20 AAC 25.005(c)(7) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on fare with the commission and identified in the application: (7),3 diagram and description of the divelter system as required by 20 AA C 25.035, unless this requirement is waived by the commission under 20 AAC 25.035(h)(2),- Please reference attachment for diverter schematic. Drilling Fluid Program Requirements of 20 AAC 25.005(c)(8) An application for a Permit to Drill nmst be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (8) a drilling fluid program, including a diagram and description of the drilling fluid system, as required by 20 AAC 25.033, Mud Program Summary Surface Intermediate Production 13-1/2" Hole 9-7/8" Hole 6-3/4" Hole 10-3/4" Casing 7-5/8" Casing 4-1/2" Liner Mud System Spud (WBM) LSND (WBM) FloPro (WBM Density 8.8-9.5 9.0-9.4 9.2-9.5 PV ALAP ALAP ALAP YP 30 - 80 20-30 15-30 Funnel Viscosity 250 — 300 Permafrost Base 100-150 to TD N/A N/A Initial Gel 30 - 50 8 -15 5 -10 10 minute Gel 30 - 50 < 30 6-15 API Filtrate NC < 10 < 6 HTHP Fluid Loss at 120 F N/A N/A < 10 H 9.0-10.0 9.0-10.0 9.0-9.5 Diagram of Doyon 142 Mud System is on file with AOGCC. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. Abnormally Pressured Formation Information Requirements of 20 AAC 25.005 (c)(9) N/A - Application is not for an exploratory or stratigraphic test well. Seismic Analysis Requirements of 20 AAC 25.005 (c)(10) N/A - Application is not for an exploratory or stratigraphic test well. Seabed Condition Analysis Requirements of 20 AAC 25.005 (c)(11) N/A - Application is not for an offshore well. Evidence of Bonding Requirements of 20 AAC 25.005 (c)(12) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. Proposed Drilling Program Requirements of 20 AAC 25.005 (c)(13) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: The proposed drilling program follows. Please refer to attachment for proposed well schematic. 1. With 6-3/4" bit, motor, GR/Res, and magnets, and drill —200' of new hole in the B sand. POOH. 2. Pick up 6-3/4" RSS lateral drilling assembly with GR, Res, periscope and RIH. 3. Drill lateral to B Sand TD per directional plan. 4. BROOH to window and circulate clean before coming out and laying down BHA. 5. RIH with whipstock retrieval tool. Retrieve whipstock and POOH. 6. Run 4.5" slotted liner with hook hanger and MWD for orientation. POOH with running tools. 7. Make up and run in hole to install LEM (lateral entry module) with ZXP packer. POOH with running tools. 8. Run & set Baker whipstock system, placing the top of the window just below the top of the D sand orienting with MWD. 9. Mill 6-3/4" window until top mill across face & clean up window. 10. Perform formation integrity test to minimum of 11.5 ppg, maximum of 13.0 ppg EMW, recording results. 11. POOH with milling BHA. 12. PU 6-3/4" bit, motor, MWD (GR/Res), and magnets to perform a clean out run & land the well. 13. RIH, orient through window and tag bottom. 14. End 1H-104L3 PTD & begin 1H-104L4 PTD. Discussion of Mud and Cuttings Disposal and Annular Disposal Requirements of 20 AAC 25.005 (c)(14) An application for a Permit to Drill music be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (14) a general description of how the operator plans to dispose of drilling Hued and cuttings and a statement of whether the operator intends to request authori_ation under 20 AAC 25.080 for an annular disposal operation in the well.; Waste fluids and cuttings generated during the drilling process will be disposed of by hauling the fluids to a KRU Class II disposal well at the I Facility. If needed, excess cuttings generated will be hauled to Milne Point or Prudhoe Bay Grind and Inject Facility for temporary storage and eventual processing for injection down an approved disposal well, or stored, tested for hazardous substances, and (if free of hazardous substances) used on pads and roads in the Kuparuk area in accordance with a permit from the State of Alaska. Attachments: Attachment 1 BOP Ram Placement Attachment 2 Well Schematic Attachment 3 Diverter Layout Diagram Attachment 4 Directional Plan Attachment 5 Drilling Hazards Summary 7 r- , III 1 C, I IIII I 1 ; ; IJI v M 1 III ' M � I IIII ' %a � 1 III ; � � , III ' III j � M ' IIII 1 N ' III O I III I N l� 1 III ' G� i III 1 a i IIII 1 m <•" i III I � F I III f `p o i III i Q N ; III I , IIII 1 V M ; IIII I I III 1 ; I'I I CV 1 III ' vMi 1 IIII ' G 1 III ; N ; III a r 1 III 1 7t Qj I III 1 1 IIII � 7 h 1 III ' ; 111 ; I I I I •� I III ; i {�{ i � ; III I `D I hl I M � III ; III ; , III ; I IIII 1 1 III 1 , III , I 1 II ; III I � III � , IIII , III o0 � III C I 1 1 1 1 IIII , O I III 1 � III ' 1 I I 1 1 111 ; �1 III I NI IIII 1 Q CF, III I �I III I F G,, IIII 1 M t�. 1 III I c3 1 I I I I ^y, IIII I 1 III I ' �l , III I �O 1 III I M� I IIII I � a 1 I I I .Grj 1 III 1 III ; ' 0., IIII C; IIII I �O F iii p I ' 'O c ; ul O0 III Q ' I❑ 1 V] un ° � 1 III ' V M pj I III ' �" aC l IIII I 3- I IIII I `� N I 111 j 1 III 1 ^ NI III 1 I IIII I V' > > 50 I I � 1 Ip a 1 IIII � ' y ; III p1 III IIII I ", O O 0 1 III ; G V] 1 III 1 IIII 1 ,-7 IN. m N 0o p, O G al ry III , III ..� W N4 v' v E ❑ a .3 q en it v v a o0 aRi .X C � � � � ❑ a a: � •T• I� O G 0 ao z , N 80 Z to N � ❑ M b0 � y 0. z o� O 7 ._N-. V q V •T F r-7 M � h rCD �a h W � C � IH-104 Well Desi n ConocoPhil l i ps g Revised by Brun19118 Alaska (Penta Lateral with Slotted Liner) osi�i�a 8:34, May 04 2018 1H-10411.3wp23 C' required Plan Summarl 5-K-15.UG_(Na-WS_D I m N WS_B rn a� o n n 10IN% 0 I T-3 JST l UG A WS F WS A3 WS A2 - - -it 0ill Ill ifli'llil 1" -� o i 20" x 42' 3375 6750 10125 13500 4 1/2" x 6-3/4' I Measured Depth ` \ L �000 Plan: 54.1+39 @ 93.1Ousft (Doyon 142) ! ' ooa 20"XO-ti ooQ jfI Iz I 3 0 c 10 3/4" ^o ° ° o ° ° TrDo 0 o 5757 o ° m Do 63 c, a0 �� 5757 - 5950 0 2 U� 0 10000 003 2500 �^ 7-5/8" x 9-7/8' ---- .-- 330 �,, 30 5950 - 6140 4 K 6-3/4' Horizontal Departure ° ° 6140 - 6330 2wp23 6330 - 6530 oc 6530 - 6720 300 60 6720 - 6910 OU 60 6910 - 7100 (D 7100 - 7540 1n y 7540 7980 7980 8410 c) 30 270 (#/ 90 8410 - 8850 o /(1 8850 - 9290 „rl ff I, szso - 9720 .I,, d I 9720 - 10160 m U 0 I 1 H-104 10160 - 10600 10600 - 11470 7500 9000 10500 12000 13500 15000 16500 18000 240 120 11470 - 12330 Measured Depth 12330 - 13200 SURVEY PROGRAM 13200 - 14070 14070 - 14930 Depth From Depth To Survey/Plan Tool Pad Elevation: 54.10 210 150 39.00 900.00 1H-104wp23 (Plan: 1H-104) GYD-GC-SS 14930 15800 900.00 1895.00 11­1-104wp23 (Plan: 1H-104) MWD+IFR-AK-CAZ-SC 180 15800 16670 1895.00 5756.70 1H-104wp23 (Plan: 1H-104) MWD+IFR-AK-CAZ-SC 16670 - 17532 5756.70 6200,00 1H-104L3wp23 (Plan: 1H-104L3)MVVD-INC_ONLY 3667 655757 70 7-5/8" X 9am 6200.00 7700.00 1H-104L3wp23(Plan: 1H-104L3MWD 3908.107531:75 41/2"X6-3/4" Magnetic Model & Date: BGGM20191-Aug-17 6200.00175R7050 1H-104L3wp23 (Plan: 1H-104L3)MVVD+IFR-AK-CAZ-SC Magnetic North is 17.56° East of True North (Magnetic Declination) Magnetic Dip & Field Strength: 80.95o 57494nT SECTION DETAILS Lithology Column Sec MD Inc TVD tNI-S 4F.SS Dlag TFace Target Annotation ,z 6VS.d7,70 1 5756.70 76.63 99 60 3668.20-2467.70 1110-3 -13 0.00.26]31 2 5769.50 7. 98.89 3670.95-269.71 1101.93 1590-20.0p-2472.74 KOPH.V 15.9'/100' OLS, -20' TF, for 12.8' Hod forI 3 56.9.50 ]8 54 W73 3703.42-2472.74 1121.30 0.OD 0.00 -2515 57 4 60560E 89.17 99.73 3703.42-2515.5] 4.00 Start 4 282 DLS, 4.5G TF, for 26fi.56 for 282E ISIS1.2-M ON-2515.5] S 6338.66 S9.17 99.73 36].51-2573.85 1660.9E 1,50 0.60-25172.62 73.85 1H-104L301.T01O9-11-1)RP 6 ­.83 57.53 So fired 1 VY 17O.6, 1]292' V. br 81 9' •'for62T 1649.1 99.9E 371D68 I582.15 1 69,46 1.50 170,93-2582.85 a 6854,41 87.53 99.96 3728.12 -2652.26 216655 0.00 000-2652.2E Hoiltlfor405.S8' SmA-W DO., 88.49' TF for 293.W PFROST 9 7153.to 17:11 91.00 3740.30-2680.74 2465.33 3.00 -08.49.2680.74 1H-104L302,TO209-14-17 csd 107S81.03 88.04 UA6 376.59-2671.13 2692.77 300 -08.14-2671.13 11 8083.91 88.P1 84,16 3772.67-2599.68 3391.59 0.00 a M0 2599.68 Adjust TF to 88.14%1or 227.93' Hold for 702.8T Sort 2'/10% DL6, 92.81- TF far 142' 1820.1 T-3 12 8225.90 57.90 87.00 3777.70-2588.14 3533.0E 2.00 92.81-2588.74 1 H-1 NO 03- 09-11-17 RP 13 S417.33 87.81 90.83 3784.87-2585.12 3724,28 2.00 91.42-25S5.12 14107MS2 87.81 90.83 38]5.42 -26196 63391.79 0.00 D.00-2619,43 Adj . TF to 91.42', for 191 AS Hold far2369.6 Stall 2'1100 MS. 41321'TF, for 191.64' 2018.1 1510978 46 87,613 87.00 3883.10-2615.81 6283.21 2.00-93.21.2615 81 1H-1041.3 T11 012318 RP 1611080.]9 89.60 8].45 3885.60-2610.85 6385.38 2-12.58.261085 A11us1 TF to 12.58', for 102.33' Holtl for 264.13 1 ]11284.92 W 60 87.45 3587.04-2601.75 6589.31 D00 000.2601.75 1813495.41 87.00 37.75 3957.10 -161 ].18 8490.03 2.25 .93.59-1617.18 1H-INU T12012318 RP 191353329 WAS 37.74 3959.36-158I37 8513.18 225 -16.44.158].27 Stad 2.25'11WMS,-93.59' TF far 2210.49' Ad-TF ta-16A4', for 37.88' Hold for 16.61' 2013708.91 SSA5 3734 3971A6 .1448.72 8620.43 0.00 D00-146.72 2114063.5E 9000 29.]5 3983.10.1154.27 8817.11 2.50 E4.43-1154.27 1H-104L3 T13012318 RP 221437].35 9353 22.74 39]341 4173.1E 8955.72 2.50 4i3.16 -083.18 Stall2.5"'DO, A AX TF for 354.65 Adlurt TF to 4i3.16', for 313.6 HOW for63.BT K-15 2314" 22 93.53 22.74 3969.E -014.39 8980.3E 0.00 0.00 -014 39 2414661.24 95.00 18.00 3953.10 -008.78 9056.72 225 .7260 60838 1H-1 NO T14012318 RP 2514719.16 84,S9 16,70 396.11-553.69 9073.92 2.25 -9427 .553.69 Start 2.25'/100 DO. -72.6' V,, for 22002' Adj..TF to-94.T!', for 57.93' Hold for 84.32' 2614803.48 94.89 16.]0 396.92 d6.23 9098.06 0.00 0.00 473.23 271 US M 93,25 3.25 3898.10 115,36 9201.49 2.25 -96.46 115,36 1H-104L3T15012318 RP Start 225'I10%DL6. -98.6' TF, for 600.53' Adlurt TF b-121,4', for 163.1% 2815567.19 91.SS D.12 3891.57 278,32 9206,27 2.25 -121.6 278.32 2916327.72 91,33 D.12 3373- 1036.64 9207.80 0.00 0.001a... Hold for ]6053' -2'/10%DLS, 17837-TF. for 6S6 3016394.52 90.00 0,20 3873.10 1115.43 920].99 200 176,371105.43 1HAUL3 T16012318 RP 31IN 96 88.77 0,39 3973.77 116711 9208.31 2.1 171A71167.87 321:676.12 SS77 0,39 3878.49 1386.97 9209.81 000 D. 13W 07 Adjust TF to 1]1.17', br 62.44' Hddfor219.15' Start 4'/100' DO,-179.9' TF, for 169.15' 2901.1 331686.27 8200 0,38 3S92.16 1555.47 9210.94 4.00-17S901555,47 1HANO Tt 7012316 RP Adjust TF to-178.77%for 25.73' 3416171.1 8097 US 389591 1580.91 9211.11 4.00-178,771W8 el HOW br 11.12' UG C 3116882.12 80.97 6.3E 389].66 1591 90 9211.18 0.00 0.00 1591.90 3617026.60 86.15 0.40 3913.10 1735.E 921113 4.00 0.421]35.6 1H-104OT18012318RP 371)13329 91.02 0.3] 3915.18 1842.13 9212.85 400 -0.361842.13 51aH 4'/10%OL6, 0.42- TF for 1"AS Atllost T107D ,13,4210G.T MOW for 3WAS' - 313f'G B 3817531.]5 91.02 0.37 3908.10 226.52 9215.44 0.00 0.002240.13 1H-104L3 T19012318 RP TD: 1753175' MD. 3908.1' WD uu 323UG Failed AC with Motherbore, L1 & 3335.1 _A L2. Has CLose approach with Na 1 H-11. TCRs 358 required. 117o71 3BSW�-A2 By signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured it's completeness, and all surrounding wells are assigned to the proper position, and I approve the scan and collision avoidance plan as set out in the audit pack.) approve it as the basis for the final well plan and wellsite drawings. I also acknowledge that unless notified otherwise all tarqets have a 100 feet lateral tolerance. V. Osara I lHuy Bui Anhj I Erik Sterk z H O L m U L a z o cn w = _ LCJ W- 11 N f (6 N W CJ N� Q {QQN,�� O N M � O J J 1p� m p N J O� m M mco �Q M O �9- N M N M O r OO `"- NO cmd. � �„� U� M OC7m C fir, M � —O U Ci m O N M M O N co O O � U co M LO O V co U U co co .- V co O U O� N O � Q N J Q N mp co N U r-- vU U v o � � U L ,n fj 4 U o � U M M J. N tt(ak�'w_/� Q M a J v 0 = M co T� ►�I'At —• ■■ \\ �\ \'' I'' h ► / u ■■ u ■ � �i • a c w 73 0 0 C M w Q I'll 1 Q V Q N O o M N a � o m e�8 N M o � N N M N N � N N N N O N ao c ao 0o ao L- a_ M C r M r Cl) r CO ap r N C N N N CO O r O r O r O r O (V r r M M N r O M 04 _ J J J J Q J p') i— N J a OT Or J O; r0 ' p H i i r r O r _ CD � r X 4. O M N y � o M 14 � o r o N x ar a� O O CDo O CDO O LO O m co 7ui/4sn oo5�) (+)gIJON/(-)u}flog x co L9 r- u O O LO O r O O LO I— C) O O O � U) O O LO O It + U) to W O O O M O O r O 1 O LO r- £Zdmtlo �-H JIM-IU4L-IWPZ,51 1H-104L2wp23 ------------+ 1 H-104L3wp23 - Q� OOOL 6 o 00 .68 0 0 0 N 4) co b 0 O O O � O o O O O O O C.0 `-' o <O OO D p a O O O O - N c O X p O U O N CO (n N M U _ O � N OOOR - 0 0 N C M a J 00 000£ , O t �o o0 0 N 0 X co i O O O O r— O CO co O Cfl N O �(ui/jsn 099) yjda�eai�analan M co £zdmto �-H z , 1H-104L1wp23 1H-104L2wp23 - - -- - - - - - -- 0 N - 532 __------- 1H-104L3wp23 ' M 0001 6 x `- 0 o T- CV O °68 0 O CN 000 0 0 0 co 0 ° 0 0 0 000 c o U N C/) O U M N N 000R _ - 0 0 -N M J -- 0 0 -00 O 000£6 , r _ zL r °° � a m LO o U") o U') o 14- CN o M LO M CD M I- 00 0 o O co (u!/Ijsn 58) y}daa leoi1jeA anal ConocoPhillips (Alaska) Inc. -Kup1 Kuparuk River Unit Kuparuk 1 H Pad Plan: 1 H-104 50029xxxxx00 Plan: 1 H-1041-3 Plan: 1 H-104L3wp23 Standard Proposal Report 04 May, 2018 ConocoPhillips ConocoPhilli s p Database: OAKE DM P2 Company: ConocoPhillips (Alaska) Inc. -Kup1 Project: Kuparuk River Unit Site: Kuparuk 1 H Pad Well: Plan: 1 H-104 Wellbore: Plan: 1 H-1041-3 Design: 1 H-104L3wp23 Schiumberger Standard Proposal Report Local Co-ordinate Reference: Well Plan: 1 H-104 TVD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) MD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) North Reference: True Survey Calculation Method: Minimum Curvature - Project Kuparuk River Unit, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site Kuparuk 1 H Pad Site Position: Northing: Latitude: From: Map Easting: Longitude: Position Uncertainty: 0.00 usft Slot Radius: 0 " Grid Convergence: 0.37 ° Well Plan: 1 H-104 Well Position +N/-S 811.26 usft Northing: Latitude: +E/-W 376.91 usft Easting: Longitude: Position Uncertainty 0.00 usft Wellhead Elevation: Ground Level: 54.10 usft Wellbore Plan: 1 H-104L3 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (1) (°) (nT) BGGM2017 8/1/2017 17.56 80.95 57,494 Design 1 H-104L3wp23 Audit Notes: Version: Phase: PLAN Tie On Depth: 5,756.70 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (I 39.00 0.00 0.00 0.00 Plan Survey Tool Program Date 5/4/2018 Depth From Depth To (usft) (usft) Survey (Wellbore) Tool Name Remarks 1 5,756.70 6,200.00 1H-104L3wp23 (Plan: 1H-1041-3) MWD-INC_ONLY MWD-INC—ONLY—FILLER 2 6,200 00 7.700.00 1 H-104L3wp23 (Plan: 1 H-1041-3) MWD MWD - Standard 3 6,200.00 17,531.75 1H-104L3wp23 (Plan: 1H-1041-3) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/4/2018 9:32:06AM Page 2 COMPASS 5000.14 Build 85 4 ConocoPhilli s p Database: Company: Project: Site: Well: Wellbore: Design: Plan Sections Measured Depth (usft) OAKEDMP2 ConocoPhillips (Alaska) Inc. -Kupl Kuparuk River Unit Kuparuk 1H Pad Plan: 1 H-104 Plan: 1 H-104L3 1H-104L3wp23 Inclination Azimuth (1) (`) 5,756.70 76.63 99.60 5,769.50 78.54 98.89 5,789.50 78.54 98.89 6,056.06 89.17 99.73 6,338.66 89.17 99.73 6,400.56 88.25 99.85 6,448.83 87.53 99.96 6,854A1 87.53 99.96 7,153.10 87.80 91.00 7,381.03 88.04 84.16 8,083.91 88.04 84.16 8,225.90 87.90 87.00 8,417.33 87.81 90.83 10,786.82 87.81 90.83 10,978.46 87.60 87.00 11,080.79 89.60 87.45 11,284.92 89.60 87.45 13,495.41 87.00 37.75 13,533.29 86.15 37.74 13,708.91 86.15 37.74 14,063.56 90.00 29.75 14,377.35 93.53 22.74 14,441.22 93.53 22.74 14,661.24 95.00 18.00 14,719.16 94.89 16.70 14,803.48 94.89 16.70 15,404.00 93.25 3.25 15,567.19 91.33 0.12 16,327.72 91.33 0.12 16,394.52 90.00 0.20 16,456.96 88.77 0.39 16,676.12 88.77 0.39 16,845.27 82.00 0.38 16,871.00 80.97 0.36 16,882.12 80.97 0.36 17,026.60 86.75 0.40 17,133.29 91.02 0.37 17,531.75 91.02 0.37 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Schlumberger Standard Proposal Report Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature Vertical Dogleg Build Turn Depth +N/-S +E/-W Rate Rate Rate (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) 3,668.20 -2,467.70 1,089.59 0.00 0.00 0.00 3,670.95 -2,469.71 1,101.93 15.90 14.95 -5.55 3,674.93 -2,472.74 1,121.30 0.00 0.00 0.00 3,703.42 -2,515.57 1,382.45 4.00 3.99 0.32 3,707.51 -2,563.33 1,660.96 0.00 0.00 0.00 3,708.90 -2,573.85 1,721.94 1.50 -1.49 0.19 3,710.68 -2,582.15 1,769.46 1.50 -1.48 0.24 3.728.12 -2,652.26 2,168.56 0.00 0.00 0.00 3,740.30 -2.680.75 2,465.33 3.00 0.09 -3.00 3,748.59 -2,671.13 2,692.77 3.00 0.10 -3.00 3,772.67 -2,599.68 3,391.59 0.00 0.00 0.00 3,777.70 -2,588.74 3,533.06 2.00 -0.10 2.00 3,784.87 -2,585.12 3,724.28 2.00 -0.05 2.00 3,875.42 -2,619.43 6,091.79 0.00 0.00 0.00 3,883.10 -2,615.81 6,283.21 2.00 -0.11 -2.00 3,885.60 -2,610.85 6,385.38 2.00 1.95 0.44 3,887.04 -2.601.75 6,589.31 0.00 0.00 0.00 3,957.10 -1,617.18 8,490.03 2.25 -0.12 -2.25 3,959.36 -1,587.27 8,513.18 2.25 -2.25 -0.02 3,971.16 -1,448.72 8,620.43 0.00 0.00 0.00 3,983.10 -1,154.27 8,817.11 2.50 1.09 -2.25 3,973.41 -873.18 8,955.72 2.50 1.13 -2.23 3,969.48 -814.39 8,980.36 0.00 0.00 0.00 3,953.10 -608.78 9,056.72 2.25 0.67 -2.16 3,948.11 -553.69 9,073.92 2.25 -0.19 -2.25 3,940.92 -473.23 9,098.06 0.00 0.00 0.00 3,898.10 115.36 9,201.49 2.25 -0.27 -2.24 3,891.57 278.32 9,206.27 2.25 -1.17 -1.92 3,873.88 1,038.64 9,207.81 0.00 0.00 0.00 3,873.10 1,105.43 9,207.99 2.00 -2.00 0.13 3,873.77 1,167.87 9,208.31 2.00 -1.98 0.31 3,878.49 1,386.97 9,209.81 0.00 0.00 0.00 3,892.10 1,555.47 9,210.94 4.00 -4.00 -0.01 3,895.91 1,580.91 9,211.11 4.00 -4.00 -0.09 3,897.66 1,591.90 9,211.18 0.00 0.00 0.00 3,913.10 1,735.48 9,212.13 4.00 4.00 0.03 3,915.18 1,842.13 9,212.85 4.00 4.00 -0.02 3,908.10 2,240.52 9,215.44 0.00 0.00 0.00 TFO (°) Target 0.00 -20.00 0.00 4.56 0.00 172.62 1H-104L3 01.T01 09- 170.93 0.00 -88.49 1 H-1041-3 02.T02 09- -88.14 0.00 92.81 1 H-1041-3 03303 09- 91.42 0.00 -93.21 1 H-1041-3 T11 01231 E 12.58 0.00 -93.59 1 H-104L3 T12 012311 -179.44 0.00 -64.43 1H-1041-3 T13 012311 -63.16 0.00 -72.60 1H-1041-3 T14 012311 -94.77 0.00 -96.46 1 H-1041-3 T15 012311 -121.40 0.00 176.37 1 H-1041-3 T16 012311 171.17 0.00 -179.90 1 H-104L3 T17 012311 -178.77 0.00 0.42 1 H-1041-3 T18 012311 -0.36 0.00 1 H-1041-3 T19 012311 51412018 9:32:06AM Page 3 COMPASS 5000.14 Build 85 ConocoPhilli s p Schlumberger Standard Proposal Report Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: 1 H-104 Company: ConocoPhillips (Alaska) Inc. -Kupl TVD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Project: Kuparuk River Unit MD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Site: Kuparuk 1 H Pad North Reference: True Well: Plan: 1H-104 Survey Calculation Method: Minimum Curvature Wellbore: Plan: 1 H-1041-3 Design: 1H-104L3wp23 Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Section Rate Rate Rate (usft) V) (I (usft) (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) 5,756.70 76.63 99.60 3,668.20 -2,467.70 1,089.59 -2,467.70 0.00 0.00 0.00 KOP: 15.9°/100' DLS, -20' TF, for 12.8' 5,757.70 76.78 99.54 3,668.43 -2,467.87 1,090.55 -2,467.87 15.90 14.94 -5.59 7-5/8" x 9-7/8" 5,769.50 78.54 98.89 3,670.95 -2,469.71 1,101.93 -2,469.71 15.90 14.95 -5.54 Hold for 20' 5,789.50 78.54 98.89 3,674.93 -2,472.74 1,121.30 -2,472.74 0.00 0.00 0.00 Start 4°/100' DLS, 4.56° TF, for 266.66' 5,800.00 78.96 98.92 3,676.98 -2,474.33 1,131.47 -2,474.33 4.00 3.99 0.32 5,900.00 82.95 99.24 3,692.70 -2,489.92 1,228.97 -2,489.92 4.00 3.99 0.32 6,000.00 86.94 99.56 3,701.51 -2,506.18 1,327.22 -2,506.18 4.00 3.99 0.31 6,056.06 89.17 99.73 3,703.42 -2,515.57 1,382.45 -2.515.57 4.00 3.99 0.31 Hold for 282.6' 6,100.00 89.17 99.73 3,704.05 -2,523.00 1,425.76 -2,523.00 0.00 0.00 0.00 6,172.35 89.17 99.73 3,705.10 -2,535.22 1,497.06 -2,535.22 0.00 0.00 0.00 WS_A4 6,200.00 89.17 99.73 3,705.50 -2,539.90 1,524.31 -2,539.90 0.00 0.00 0.00 6,300.00 89.17 99.73 3,706.95 -2,556.80 1,622.86 -2,556.80 0.00 0.00 0.00 6,338.66 89.17 99.73 3,707.51 -2,563.33 1,660.96 -2,563.33 0.00 0.00 0.00 Start 1.5°/100' DLS, 172.62° TF, for 61.9' 6,400.00 88.26 99.85 3,708.88 -2,573.76 1,721.39 -2,573.76 1.50 -1.49 0.19 6,400+56 88.25 99.85 3,708.90 -2,573.85 1,721.94 -2,573.85 1.50 -1.49 0.19 Adjust TF to 170.93°, for 48.27' 6,448.83 87.53 99.96 3,710.68 -2,582.15 1,769.46 -2,582.15 1.50 -1.48 0.24 Hold for 405.58' 6,500.00 87.53 99.96 3,712.88 -2,591.00 1,819.81 -2,591.00 0.00 0.00 0.00 6,600.00 87.53 99.96 3,717.18 -2,608.28 1,918.21 -2,608.28 0.00 0.00 0.00 6,700.00 87.53 99.96 3,721.48 -2,625.57 2,016.61 -2,625.57 0.00 0.00 0.00 6,800.00 87.53 99.96 3,725.78 -2,642.86 2,115.01 -2,642.86 0.00 0.00 0.00 6,854.41 87.53 99.96 3,728.12 -2,652.26 2,168.56 -2,652.26 0.00 0.00 0.00 Start 3'/100' DLS,-88.49° TF, for 298.69' 6,900.00 87.57 98.60 3,730.07 -2,659.61 2,213.50 -2,659.61 3.00 0.08 -3.00 7,000.00 87.66 95.59 3,734.23 -2,671.95 2,312.64 -2,671.95 3.00 0.09 -3.00 7,100.00 87.75 92.59 3,738.24 -2,679.08 2,412.29 -2,679.08 3.00 0.09 -3.00 7,153.10 87+80 91.00 3,740.30 -2,680.75 2,465.33 -2,680.75 3.00 0.10 -3.00 Adjust TF to-88.14°, for 227.93' 7,200.00 87.85 89.59 3,742.08 -2,680.99 2,512.19 -2,680.99 3.00 0.10 -3.00 7,300.00 87.95 86.59 3,745.75 -2,677.66 2,612.06 -2,677.66 3.00 0.10 -3.00 7,381.03 88.04 84.16 3,748.59 -2,671.13 2,692.77 -2,671.13 3.00 0.11 -3.00 Hold for 702.87' 7,400.00 88.04 84.16 3,749.24 -2,669.21 2,711+63 -2,669.21 0.00 0.00 0.00 7,425.15 88.04 84.16 3,750.10 -2,666.65 2,736.64 -2,666.65 0.00 0.00 0.00 WS_A3 7,500.00 88.04 84.16 3,752.66 -2,659.04 2,811.05 -2,659.04 0.00 0.00 0.00 7,600.00 88.04 84.16 3,756+09 -2,648.87 2,910.47 -2,648.87 0.00 0.00 0.00 7,700.00 88.04 84.16 3,759.51 -2,638.71 3,009.90 -2,638.71 0.00 0.00 0.00 7,800.00 88.04 84.16 3,762.94 -2,628.54 3,109.32 -2,628.54 0.00 0.00 0.00 7,900.00 88.04 84.16 3,766.37 -2,618.37 3,208.74 -2,618.37 0.00 0.00 0.00 8,000.00 88.04 84.16 3,769.79 -2,608.21 3,308.17 -2,608.21 0.00 0.00 0.00 8,083.91 88.04 84.16 3,772.67 -2,599.68 3,391.59 -2,599.68 0.00 0.00 0.00 Start 2°/100' DLS, 92.81' TF, for 142' 8,100.00 88.02 84.48 3,773.22 -2,598.09 3.407.59 -2,598.09 2.00 -0A0 2.00 8,200.00 87.92 86.48 3,776.76 -2,590.22 3,507.22 -2,590.22 2.00 -0.10 2.00 51412018 9:32:06AM Page 4 COMPASS 5000.14 Build 85 I Con Philli oco ps Database: OAKEDMP2 Company: ConocoPhillips (Alaska) Inc. -Kup1 Project: Kuparuk River Unit Site: Kuparuk 1 H Pad Well: Plan: 1 H-104 Wellbore: Plan:1H-104L3 Design: 1 H-104L3wp23 Planned Survey Measured Depth Inclination Azimuth (usft) (I V) 8,225.90 87.90 87.00 Adjust TF to 91.42°, for 191.43' 8,300.00 87.86 88.48 8,400.00 87.82 90.48 8,417.33 87.81 90.83 Hold for 2369.48' 8,500.00 87.81 90.83 8,600.00 87.81 90.83 8,700.00 87.81 90.83 8,800.00 87.81 90.83 8,900.00 87.81 90.83 9,000.00 87.81 90.83 9,100.00 87.81 90.83 9,200.00 87.81 90.83 9,300.00 87.81 90.83 9,400.00 87.81 90.83 9,500.00 87.81 90.83 9,600.00 87.81 90.83 9,700.00 87.81 90.83 9,800.00 87.81 90.83 9,900.00 87.81 90.83 10,000.00 87.81 90.83 10,100.00 87.81 90.83 10,200.00 87.81 90.83 10,255.05 87.81 90.83 WS_A2 10,300.00 87.81 90.83 10,400.00 87.81 90.83 10,500.00 87.81 90.83 10,600.00 87.81 90.83 10,700.00 87.81 90.83 10,786.82 87.81 90.83 Start 2°/100' DLS,-93.21° TF, for 191.64' 10,800.00 87.80 90.57 10,900.00 87.68 88.57 10,978.46 87.60 87.00 Adjust TF to 12.58°, for 102.33' 11,000.00 88.02 87.09 11,080.79 89.60 87.45 Hold for 204.13' 11,100.00 89.60 87.45 11,200.00 89.60 87.45 11,284.92 89.60 87.45 Start 2.25'/100' DLS,-93.59° TF, for 2210.49' 11,300.00 89.58 87.11 11,400.00 89.44 84.86 11,500.00 89.30 82.62 11,600.00 89.16 80.37 11,700.00 89.02 78.12 11,800.00 88.88 75.88 11,900.00 88.75 73.63 12,000.00 88.62 71.38 12,100.00 88.49 69.14 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Vertical Depth +N/-S (usft) (usft) 3,777.70 -21588 74 Vertical +E/-W Section (usft) (usft) 3,533.06-2,588.74 Schlumberger Standard Proposal Report Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature Dogleg Build Turn Rate Rate Rate ("1100usft) (°/100usft) (°/100usft) 2.00 -0.10 2.00 3,780.44 -2,585.83 3,607.05 -2,585.83 2.00 -0.05 2.00 3,784.21 -2,584.92 3,706.97 -2,584.92 2.00 -0.05 2.00 3,784.87 -2,585.12 3,724.28 -2,585.12 2.00 -0.04 2.00 3,788.03 -2,586.32 3,806.88 -2,586.32 0.00 0.00 0.00 3,791.85 -2,587.77 3,906.80 -2,587.77 0.00 0.00 0.00 3,795.67 -2,589.22 4,006.72 -2,589.22 0.00 0.00 0.00 3,799.49 -2,590.66 4,106.63 -2,590.66 0.00 0.00 0.00 3,803.31 -2,592.11 4,206.55 -2,592.11 0.00 0.00 0.00 3,807.14 -2,593.56 4,306.46 -2,593.56 0.00 0.00 0.00 3,810.96 -2,595.01 4,406.38 -2,595.01 0.00 0.00 0.00 3,814.78 -2,596.46 4,506.30 -2,596.46 0.00 0.00 0.00 3,818.60 -2,597.90 4,606.21 -2,597.90 0.00 0.00 0.00 3,822.42 -2,599.35 4,706.13 -2,599.35 0.00 0.00 0.00 3,826.24 -2,600.80 4,806.05 -2,600.80 0.00 0.00 0.00 3,830.07 -2,602.25 4,905.96 -2,602.25 0.00 0.00 0.00 3,833.89 -2,603.69 5,005.88 -2,603.69 0.00 0.00 0.00 3,837.71 -2,605.14 5,105.80 -2,605.14 0.00 0.00 0.00 3,841.53 -2,606.59 5,205.71 -2,606.59 0.00 0.00 0.00 3,845.35 -2,608.04 5,305.63 -2,608.04 0.00 0.00 0.00 3,849.17 -2,609.49 5,405.55 -2,609.49 0.00 0.00 0.00 3,853.00 -2,610.93 5,505.46 -2,610.93 0.00 0.00 0.00 3,855.10 -2,611.73 5,560.47 -2,611.73 0.00 0.00 0.00 3,856.82 -2,612.38 5,605.38 -2,612.38 0.00 0.00 0.00 3,860.64 -2,613.83 5,705.30 -2,613.83 0.00 0.00 0.00 3,864.46 -2,615.28 5,805.21 -2,615.28 0.00 0.00 0.00 3,868.28 -2,616.73 5,905.13 -2,616.73 0.00 0.00 0.00 3,872.10 -2,618.17 6,005.04 -2,618.17 0.00 0.00 0.00 3,875.42 -2,619.43 6,091.79 -2,619.43 0.00 0.00 0.00 3,875.93 -2,619.59 6,104.96 -2,619.59 2.00 -0.11 -2.00 3,879.87 -2,618.84 6,204.88 -2,618.84 2.00 -0.11 -2.00 3,883.10 -2,615.81 6,283.21 -2,615.81 2.00 -0.11 -2.00 3,883.92 -2,614.70 6,304.70 -2,614.70 2.00 1.95 0.44 3,885.60 -2,610.85 6,385.38 -2,610.85 2.00 1.95 0.44 3,885.74 -2,609.99 6,404.57 -2,609.99 0.00 0.00 0.00 3,886.44 -2,605.54 6,504.47 -2,605.54 0.00 0.00 0.00 3,887.04 -2,601.75 6,589.31 -2,601.75 0.00 0.00 0.00 3,887.15 -2,601.04 6,604.37 -2,601.04 2.25 -0.14 -2.25 3,888.01 -2,594.03 6.704.11 -2,594.03 2.25 -0.14 -2.25 3,889.11 -2,583.13 6,803.50 -2,583.13 2.25 -0.14 -2.25 3,890.46 -2,568.34 6,902.39 -2,568.34 2.25 -0.14 -2.25 3,892.05 -2,549.68 7,000.61 -2,549.68 2.25 -0.14 -2.25 3,893.88 -2,527.19 7,098.03 -2,527.19 2.25 -0.14 -2.25 3,895.95 -2,500.91 7,194.48 -2,500.91 2.25 -0.13 -2.25 3,898.24 -2,470.86 7,289.82 -2,470.86 2.25 -0.13 -2.25 3,900.77 -2,437.10 7,383.91 -2,437.10 2.25 -0.13 -2.25 51412018 9:32:06AM Page 5 COMPASS 5000.14 Build 85 i ConocoPhilli s p Database: Company: Project: Site: Well: Wellbore: Design: Planned Survey 0AKEDMP2 ConocoPhillips (Alaska) Inc. -Kup1 Kuparuk River Unit Kuparuk 1 H Pad Plan: 1 H-104 Plan: 1 H-104L3 1H-104L3wp23 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Schiumberger Standard Proposal Report Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +NI-S +E/-W Section Rate Rate Rate (usft) V) (^) (usft) (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) 12,200.00 88.36 66.89 3,903.51 -2,399.68 7,476.60 -2,399.68 2.25 -0.13 -2.25 12,300.00 88.24 64.64 3,906.48 -2,358.65 7,567.74 -2,358.65 2.25 -0.13 -2.25 12,400.00 88.11 62.39 3,909.67 -2,314.08 7,657.20 -2,314.08 2.25 -0.12 -2.25 12,500.00 87.99 60.15 3,913.07 -2,266.05 7,744.83 -2,266.05 2.25 -0.12 -2.25 12,600.00 87.88 57.90 3,916.67 -2,214.61 7,830.51 -2,214.61 2.25 -0.12 -2.25 12,700.00 87.76 55.65 3,920.47 -2,159.86 7,914.09 -2,159.86 2.25 -0.11 -2.25 12,800.00 87.65 53.40 3,924.47 -2,101.88 7,995.46 -2,101.88 2.25 -0.11 -2.25 12,900.00 87.55 51.15 3,928.66 -2,040.75 8,074.48 -2,040.75 2.25 -0.11 -2.25 13,000.00 87.45 48.90 3,933.02 -1,976.57 8,151.04 -1,976.57 2.25 -0.10 -2.25 13,100.00 87.35 46.65 3,937.57 -1,909.44 8,225.01 -1,909.44 2.25 -0.10 -2.25 13,200.00 87.25 44.40 3,942.28 -1,839.46 8,296.28 -1.839.46 2.25 -0.09 -2.25 13,300.00 87.16 42.15 3,947.15 -1,766.75 8,364.74 -1,766.75 2.25 -0.09 -2.25 13,400.00 87.08 39.90 3,952.17 -1,691.41 8,430.29 -1,691.41 2.25 -0.09 -2.25 13.495.41 87.00 37.75 3,957.10 -1,617.18 8,490.03 -1,617.18 2.25 -0.08 -2.25 Adjust TF to-179.44°, for 37.88' 13,500.00 86.90 37.75 3,957.34 -1,613.55 8,492.83 -1,613.55 2.25 -2.25 -0.02 13,533.29 86.15 37.74 3,959.36 -1,587.27 8,513.18 -1,587.27 2.25 -2.25 -0.02 Hold for 175.61' 13,600.00 86.15 37.74 3,963.85 -1,534.64 8,553.91 -1,534.64 0,00 0.00 0.00 13,700.00 86.15 37.74 3,970.56 -1,455.75 8,614.99 -1,455.75 0.00 0.00 0.00 13,708.91 86.15 37.74 3,971.16 -1,448.72 8,620.43 -1,448.72 0.00 0.00 0.00 Start 2.5°/100' DLS,-64.43° TF, for 364.65' 13,800.00 87.13 35.68 3,976.50 -1,375.82 8,674.78 -1,375.82 2.50 1.08 -2.26 13,900.00 88.22 33.43 3,980.56 -1,293.54 8,731.46 -1,293.54 2.50 1.09 -2.25 14,000.00 89.31 31.18 3,982.72 -1,209.05 8,784.88 -1,209.05 2.50 1.09 -2.25 14,063.56 90.00 29.75 3,983.10 -1,154.27 8,817.11 -1,154.27 2.50 1.09 -2.25 Adjust TF to-63.16°, for 313.8' 14,100.00 90.41 28.94 3,982.97 -1,122.50 8,834.96 -1,122.50 2.50 1.13 -2.23 14,200.00 91.54 26.71 3,981.27 -1,034.08 8,881.63 -1,034.08 2.50 1.13 -2.23 14,300.00 92.67 24.47 3,977.60 -943.96 8,924.78 -943.96 2.50 1.13 -2.23 14,377.35 93.53 22.74 3,973.41 -873.18 8,955.72 -873.18 2.50 1.12 -2.24 Hold for 63.87' 14,400.00 93.53 22.74 3,972.02 -852.34 8,964.45 -852.34 0.00 0.00 0.00 14,441.22 93.53 22.74 3,969.48 -814.39 8,980.36 -814.39 0.00 0.00 0.00 Start 2.25*/100' DLS, -72.6° TF, for 220.02' 14,500.00 93.93 21.48 3,965.65 -760.05 9,002.43 -760.05 2.25 0.67 -2.15 14,600.00 94.59 19.32 3,958.22 -666.59 9,037.19 -666.59 2.25 0.67 -2.15 14,661.24 95.00 18.00 3,953.10 -608.78 9,056.72 -608.78 2.25 0.66 -2.16 Adjust TF to-94.77°, for 67.93' 14,700.00 94.93 17.13 3,949.75 -571.96 9,068.37 -571.96 2.25 -0.19 -2.25 14,719.16 94.89 16.70 3,948.11 -553.69 9,073.92 -553.69 2.25 -0.19 -2.25 Hold for 84.32' 14,800.00 94.89 16.70 3,941.22 -476.55 9,097.06 -476.55 0.00 0.00 0.00 14,803.48 94.89 16.70 3,940.92 -473.23 9,098.06 -473.23 0.00 0.00 0.00 Start 2.25*1100' DLS,-96.46° TF, for 600.63' 14,900.00 94.64 14.53 3,932.90 -380.59 9,123.95 -380.59 2.25 -0.26 -2.24 15,000.00 94.38 12.29 3,925.03 -283.63 9,147.07 -283.63 2.25 -0.26 -2.24 15,100.00 94.11 10.05 3,917.63 -185.80 9,166.38 -185.80 2.25 -0.27 -2.24 15,200.00 93.83 7.81 3,910.71 -87.25 9,181.87 -87.25 2.25 -0.28 -2.24 15,300.00 93.55 5.58 3,904.27 11.85 9,193.50 11.85 2.25 -0.28 -2.24 15,400.00 93.26 3.34 3,898.33 111.37 9,201.26 111.37 2.25 -0.29 -2.24 15,404.00 93.25 3.25 3,898.10 115.36 9,201A9 115.36 2.25 -0.29 -2.24 Adjust TF to-121.4°, for 163.19' 51412018 9:32.06AM Page 6 COMPASS 5000.14 Build 85 ` / Y I ConocoPhillips Database: OAKEDMP2 Company: ConocoPhillips (Alaska) Inc. -Kupl Project: Kuparuk River Unit Site: Kuparuk 1 H Pad Well: Plan: 1 H-104 Wellbore: Plan: 1H-104L3 Design: 1 H-104L3wp23 Local Co-ordinate Reference TVD Reference: MD Reference: North Reference: Survey Calculation Method: Schlumberger Standard Proposal Report Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Section Rate Rate Rate (usft) (°) (°) (usft) (usft) (usft) (usft) (°/10ousft) (°/100usft) (°1100usft) 15,500.00 92.12 1.41 3,893,60 211.16 9,205.38 211.16 2.25 -1.17 -1.92 15,567.19 91.33 0.12 3,891.57 278.32 9,206.27 278.32 2.25 -1.18 -1.92 Hold for 760.63' 15,600.00 91.33 0.12 3,890.81 311.12 9,206.34 311.12 0.00 0.00 0.00 15,700.00 91.33 0.12 3,888.48 411.09 9,206.54 411.09 0.00 0.00 0.00 15,800.00 91.33 0.12 3,886.16 511.06 9,206.74 511.06 0.00 0.00 0.00 15,900.00 91.33 0.12 3,883.83 611.03 9,206.94 611.03 0.00 0.00 0.00 16,000.00 91.33 0.12 3,881.50 711.01 9,207.14 711.01 0.00 0.00 0.00 16,100.00 91.33 0.12 3,879.18 810.98 9,207.35 810.98 0.00 0.00 0.00 16,200.00 91.33 0.12 3,876.85 910.95 9,207.55 910.95 0.00 0.00 0.00 16,300.00 91.33 0.12 3,874.52 1,010.93 9,207.75 1,010.93 0.00 0.00 0.00 16,327.72 91.33 0.12 3,873.88 1,038.64 9,207.81 1,038.64 0.00 0.00 0.00 Start 2°/100' DLS, 176.37' TF, for 66.8' 16,394.52 90.00 0.20 3,873.10 1,105.43 9,207.99 1,105.43 2.00 -2.00 0.13 Adjust TF to 171.17°, for 62.44' 16,400.00 89.89 0.22 3,873.11 1,110.91 9,208.01 1,110.91 2.00 -1.98 0.31 16,456.96 88.77 0.39 3,873.77 1,167.87 9,208.31 1,167.87 2.00 -1.98 0.31 Hold for 219.15' 16,500.00 88.77 0.39 3,874.70 1,210.89 9,208.61 1,210.89 0.00 0.00 0.00 16,600.00 88.77 0.39 3,876.85 1,310.87 9,209.29 1,310.87 0.00 0.00 0.00 16,676.12 88.77 0.39 3,878.49 1,386.97 9,209.81 1,386.97 0.00 0.00 0.00 Start 4°/100' DLS,-179.9° TF, for 169.16' 16,700.00 87.81 0.39 3,879.21 1,410.84 9,209.97 1,410.84 4.00 -4.00 -0.01 16,800.00 83.81 0.38 3,886.51 1,510.55 9,210.65 1,510.55 4.00 -4.00 -0.01 16,845.27 82.00 0.38 3,892.10 1,555.47 9,210.94 1,555.47 4.00 -4.00 -0.01 Adjust TF to-178.77°, for 25.73' 16,871.00 80.97 0.36 3,895.91 1,580.91 9,211.11 1,580.91 4.00 -4.00 -0.09 Hold for 11.12' 16,882.12 80.97 0.36 3,897.66 1,591.90 9,211.18 1,591.90 0.00 0.00 0.00 Start 4°/100' DLS, 0.42° TF, for 144.48' 16,900.00 81.69 0.36 3,900.35 1,609.57 9,211.29 1,609.57 4.00 4.00 0.03 17,000.00 85.69 0.39 3,911.35 1,708.94 9,211.94 1,708.94 4.00 4.00 0.03 17,026.60 86.75 0.40 3,913.10 1,735.48 9,212.13 1,735.48 4.00 4.00 0.03 Adjust TF to-0.36°, for 106.7' 17,100.00 89.69 0.38 3,915.38 1,808.84 9,212.63 1,808.84 4.00 4.00 -0.02 17,133.29 91.02 0.37 3,915.18 1,842.13 9,212.85 1,842.13 4.00 4.00 -0.02 Hold for 398.46' 17,200.00 91.02 0.37 3,913.99 1,908.82 9,213.28 1,908.82 0.00 0.00 0.00 17,300.00 91.02 0.37 3,912.22 2,008.81 9,213.93 2,008.81 0.00 0.00 0.00 17,400.00 91.02 0.37 3,910.44 2,108.79 9,214.58 2,108.79 0.00 0.00 0.00 17,500.00 91.02 0.37 3,908.66 2,208.77 9,215.24 2,208.77 0.00 0.00 0.00 17,531.75 91.02 0.37 3,908.10 , 2,240.52 9,215.44 2,240.52 0.00 0.00 0.00 TD: 17531.75' MD, 3908.1' TVD - 4 1/2" x 6-3/4" 51412018 9:32:06AM Page 7 COMPASS 5000-14 Build 85 ConocoPhilli s p Database: OAKEDMP2 Local Co-ordinate Reference: Company: ConocoPhillips (Alaska) Inc. -Kupl TVD Reference: Project: Kuparuk River Unit MD Reference: Site: Kuparuk 1 H Pad North Reference: Well: Plan: 1 H-104 Survey Calculation Method: Welibore: Plan: 1 H-1041-3 Design: 1 H-104L3wp23 F - Design Targets Target Name hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Shape (°) (°) (usft) (usft) (usft) 1H-1041-301.T0109-11- 0.00 0.00 3,708.90 -2,573.85 1,721.94 - plan hits target center - Circle (radius 100.00) 1 H-1041-3 02302 09-14- 0.00 0.00 3,740.30 -2,680.75 2,465.33 - plan hits target center - Circle (radius 100.00) 1 H-104L3 03.T03 09-11- 0.00 0.00 3,777.70 -2,588.74 3,533.06 plan hits target center Circle (radius 100.00) 1H-1041-3T16012318F 0.00 0,00 3,873.10 1,105.43 9,207,99 - plan hits target center - Circle (radius 100.00) 1 H-104L3 T11 012318 R 0.00 0.00 3,883.10 -2,615.81 6,283.21 plan hits target center Circle (radius 100.00) 1H-1041-3 T17 012318 F 0.00 0.00 3,892.10 1,555.47 9,210.94 - plan hits target center - Circle (radius 100.00) 1 H-1041-3 T15 012318 F 0.00 0.00 3,898.10 115.36 9,201.49 - plan hits target center - Circle (radius 100.00) 1 H-1041-3 T19 012318 F 0.00 0.00 3,908.10 2,24052 9,215.44 - plan hits target center - Circle (radius 100.00) 1H-1041-3 T18 012318 F 0.00 0.00 3,913.10 1,735.48 9,212.13 - plan hits target center - Circle (radius 100.00) 1 H-1041-3 T14 012318 F 0.00 0.00 3,953.10 -608.78 9,056.72 - plan hits target center - Circle (radius 100.00) 1H-1041-3T12012318F 0.00 0.00 3,957.10 -1,617.18 8,490.03 - plan hits target center - Circle (radius 100.00) 1 H-1041-3 T13 012318 F 0.00 0.00 3,983.10 -1,154.27 8,817.11 - plan hits target center - Circle (radius 100.00) Schlumberger Standard Proposal Report Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name 118.10 118.10 20" x 42" 20 42 1,892.22 1,800.00 10 3/4" 10-3/4 13-1 /2 5,757.70 3,667.65 7-5/8" x 9-7/8" 7-5/8 9-7/8 17,531.75 3,908.10 4 1/2" x 6-3/4" 4-1/2 6-3/4 5/4/2018 9:32:06AM Page 8 COMPASS 5000.14 Build 85 ConocoPhilli s p Database: OAKEDMP2 Local Co-ordinate Reference: Company: ConocoPhillips (Alaska) Inc. -Kupl TVD Reference: Project: Kuparuk River Unit MD Reference: Site: Kuparuk 1 H Pad North Reference: Well: Plan: 1 H-104 Survey Calculation Method: Wellbore: Plan: 1 H-1041-3 Design: 1 H-104L3wp23 Schlumberger Standard Proposal Report Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature Formations Measured Vertical Dip Depth Depth Dip Direction (usft) (usft) Name Lithology (°) (°) 1,715.19 1,649.10 PFROST 1,916.38 1,820.10 T-3 2,158.44 2,018.10 K-15 3,381.94 2,901.10 UG_C 3,942.92 3,134.10 UG_B 4,239.85 3,235.10 UG_A 4,536.38 3,335.10 Na 5,397.38 3,585.10 WS_D 5,648.16 3,643.10 WS_C 5,754.99 3,667.10 WS_B 6,172.35 3,705.10 WS_A4 7,425.15 3,750.10 WS_A3 10,255.05 3,855.10 WS_A2 5/4/2018 9*32:06AM Page 9 COMPASS 5000.14 Build 85 ConocoPhilli s p Database: OAKEDMP2 Local Co-ordinate Reference: Company: ConocoPhillips (Alaska) Inc. -Kupl TVD Reference: Project: Kuparuk River Unit MD Reference: Site: Kuparuk 1 H Pad North Reference: Well: Plan: 1 H-104 Survey Calculation Method: Wellbore: Plan: 1 H-1041-3 Design: 1 H-104L3wp23 Schlumberger Standard Proposal Report Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 5,756.70 3,668.20 -2,467.70 1,089.59 KOP: 15.9°/100' DLS, -20' TF, for 12.8' 5,769.50 3,670.95 -2,469.71 1,101.93 Hold for20' 5,789.50 3,674.93 -2,472.74 1,121.30 Start 4'/100' DLS, 4.56' TF, for 266.56' 6,056.06 3,703.42 -2,515.57 1,382.45 Hold for282.6' 6,338.66 3,707.51 -2,563.33 1,660.96 Start 1.5°/100' DLS, 172.62° TF, for 61.9' 6,400.56 3,708.90 -2,573.85 1,721.94 Adjust TFto170.93°,for 48.27' 6,448.83 3,710.68 -2,582.15 1,769.46 Hold for 405.58' 6,854.41 3,728.12 -2,652.26 2,168.56 Start 3*/100' DLS,-88.49° TF, for 298.69' 7,153.10 3,740.30 -2,680.75 2,465.33 Adjust TF to-88.14°, for 227.93' 7,381.03 3,748.59 -2,671.13 2,692.77 Hold for 702.87' 8,083.91 3,772.67 -2,599.68 3,391.59 Start 2°/100' DLS, 92.81 ° TF, for 142' 8,225.90 3,777.70 -2,588.74 3,533.06 Adjust TF to 91.42°, for 191.43' 8,417.33 3,784.87 -2,585.12 3,724.28 Hold for 2369.48' 10,786.82 3,875.42 -2,619.43 6,091.79 Start 2°/100' DLS, -93.21 ° TF, for 191.64' 10,978.46 3,883.10 -2,615.81 6,283.21 Adjust TF to 12.58°, for 102.33' 11,080.79 3,885.60 -2,610.85 6,385.38 Hold for 204.13' 11,284.92 3,887.04 -2,601.75 6,589.31 Start 2.25'/100' DLS,-93.59' TF, for 2210.49' 13,495.41 3,957.10 -1,617.18 8,490.03 Adjust TF to-179.44°, for 37.88' 13,533.29 3,959.36 -1,587.27 8,513.18 Hold for 175.61' 13,708.91 3,971.16 -1,448.72 8,620.43 Start 2.5'/100' DLS,-64.43' TF, for 354.65' 14,063.56 3,983.10 -1,154.27 8,817.11 Adjust TF to-63.16", for 313.8' 14,377.35 3,973.41 -873.18 8,955.72 Hold for 63.87' 14,441.22 3,969.48 -814.39 8,980.36 Start 2.25°/100' DLS, -72.6° TF, for 220.02' 14,661.24 3,953.10 -608.78 9,056.72 Adjust TF to-94.77°, for 57.93' 14,719.16 3,948.11 -553.69 9,073.92 Hold for 84.32' 14,803.48 3,940.92 -473.23 9,098.06 Start 2.25'/100' DLS,-96.46° TF, for 600.53' 15,404.00 3,898.10 115.36 9,201.49 Adjust TF to-121.4°, for 163.19' 15,567.19 3,891.57 278.32 9,206.27 Hold for 760.53' 16,327.72 3,873.88 1,038.64 9,207.81 Start2'/100' DLS, 176.37' TF, for66.8' 16,394.52 3,873.10 1,105.43 9,207.99 Adjust TF to 171.17°, for 62.44' 16,456.96 3,873.77 1,167.87 9,208.31 Hold for219.15' 16,676.12 3,878.49 1,386.97 9,209.81 Start 4'/100' DLS,-179.9' TF, for 169.15' 16.845.27 3,892.10 1,555.47 9,210.94 Adjust TF to-178.77°, for 25.73' 16,871.00 3,895.91 1,580.91 9,211.11 Hold for 11.12' 16,882.12 3,897.66 1,591.90 9,211.18 Start 4*/100' DLS, 0.42' TF, for 144.48' 17,026.60 3,913.10 1,735.48 9,212.13 Adjust TF to-0.36°, for 106.7' 17,133.29 3,915.18 1,842.13 9,212.85 Hold for398.46' 17,531.75 3,908.10 2,240.52 9,215.44 TD: 17531.75' MD, 3908.1' TVD 5/4/2018 9:32:06AM Page 10 COMPASS 5000.14 Build 85 (A CL s 0 O r O u a m E c N_ 1 c O U1 � � C m N M a N W 3 d U a •_ /\ ` W O J ,f) x 'A 0 a a o V/ N L r= c Q O O c c y 3 � N cL d a N m w o ° m � c a � a (q O c ` U � /A ° 0CL 3 V� T c LL 0 ■_ ._ U N CL u W - Cl)° pr N R a__/ O c a ' a_■ _ ■ _ W Q ) a, d m tiIf Y M m M M a ci .L x r= .Q c o n O a '� !� N O a d' N¢- m o x 3 C� ca O 0 ` CA Q. Y r mo Q Q x 1 00 m i5 m o vi O = x _I O L C/ O Z N a LL N N N N a E L d CU o a) C is c y 'O .� L51 (n N Q w c a a a V Y 1 a a o o Ew M N^ CL 3 M J r" 2 r Q r C a L 0 ACL NNW O .O 2 i al V � c p t0 r+ � c) L6 LL LL d U Y Y Y N Mn N Y Y Y-- N N N - Y Y Y Y Y NNNN Y- Y Y Y Y NN Y Y Y Y Y Y 0NN N O O O O O O O O O O O O O O O O O O O O O O O O O O i i i i N N N i r N N N N N i i i i i i N N N N N N i i i i i i N N N N N N i i i i i i N N N N N N N N N (6 (0 (0 N N N N N f0 lQ N (II (D N N N N N N (6 (0 (6 (6 (0 f6 m N N N N N l6 O N N N (0 N N N N N N N LO (0 L6 (0 f0 ��a_ a- a o_ a a a a�a_ d a a n_ am a n. a_ O O O O O O U O O O O O O O U O O O O O N O O O U O U U U U U U U U m m U U U U U U m m U U U U U U U U U U U U Lm Li Li Li LLm ti LL LL LL N LL m LL LL 2 LL a LL LL N 4) 0 N N N N N N N m N m N N N y N N N N N rn N N N C C C C C C C C C C C lD (0 N (0 N N N (Q N (Lp N N N N C N (0 N l6 N ld C C C N (0 N LO (0 N m N caC C C C C C C C C N C C C N N N N N O O N O N N LU O N O N O N N N O Ul N N N N U U U U U U U C) U U U U U U U U U U U U U U U U U U m m m r r M M M M M O O O 0 V _ Cl) E;V r Itm O m m r- m V m m V m � m r- m r", m V m O O O O f` m m m m m m O m O m O m m m m m m m r_ M m e- e- r- r- r- r r-- r- r- r- r r- In m to m Lo 6 Lo Lo Lo 0 o O 0 0 0 Lri Lri Lri co N V m � m m m 04 rn N m - m m M Ln m V r m Ln o M m N O N m M V m V m M m O m � m m M m m v r- m Ln O M m N O N m CO N a m o gr ❑' C O w0 l6 LL O c L6 U m y c a z Z m O r N ` 0O m c0i a P% m m N M U T Lq O O V E K m 3 m a U U U Z � r Y n m � � U c Ln .- p Z m n c U U U Lq y £ a G Z a O. o o� c w c :o E U Y U U U W U U F � U) N 0 0 0 0 o O O O o 0 0 O O O o 0 o O O o 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Ln m Lo Lo o to o Lri o Ln o ) o o 0 0 o o o o o o o N r- r O r O rl- O r O r� O Lo O m O l0 O Lo O to O O r-b r N M N co N co N M N c' m� m r'm n m r m r,, Lo m Lo v v -zr v v v v v v v Lo Lo Ln Lo m m o 'o Ln m m m m O O O O O O O O O O N m N m N m N m co m N m Lo m Ln m Lo m Lo m Lo m m rl m n m r- m f` m r O r- m O O O O O O m O m O m O m O m Lo m m m m O, m m m, m m Lo It Ln V Lo It IT Lo V r- -- m m m m m m m m m m r- r-_ � rl- r- r- � r- rl- � O m CO V' m V m IT V m V' m _ m _ m _ m _ m _ LO . LO M m M m M m C7 m M m O O O O O m N Ln N N N N N N N N N N Lo N Ln N Ln N Ln N N N m_ V Lo r- o r- m r- m r- Lo r- m N_ m N_ m N m N_ m N N N N N N N N N N N O O O O O Ln m m m m m m m m m m m m m m m m m m m m m m M M m F- M � M M M � M m m m m m m m m m m CO m m r . r r M r M rl� M r M r M r- N V M M y' M V M V M r N � N N � N N m m m N N N N N N N N N N O O O O O O O O O O m M M O O IDO IDO C C O O m m m m m m m m m m O m m V m V m V m d' m V M _ m _ m m m _ Mo O m co m M m M m M m co m O O O O O m N Lo N N N N N N N N N N LO N Ln N Lo _ N Ln _ N m N m _ '7 LO LO r--Mn n M r- to r- m N_ m N_ m N_ m N_ m N r-N N N N N N N N N N O O O O O Lo m m m m m m m m m m m m m m m m m m m m m m J J J J J J J J J J J J J J J J N N N N N N N N O O O O O O O O O O O O O O O O �- O a o 0 o S S � � �� � •- 2 2 � � `� � T N N N N N N N N N N N N ' m m fl. o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O o 0 0 0 0 0 S S 2 2 S S S S S S- S- S S S S 2 2- S 2 2 CO CO a U O O N ol 44 4A 0 0 c 0 V Im Cl U C `O F `+ U N LL U u E z O a Gl E z Y Y Y Y Y Y Y Y Y Y Y Y N N N N N N N N N N N N O O O O O O O O O O O O N N N N N N N N N N N N N N N N N N N N N N w N (0 l9 N (0 l9 (6 (0 (Q l6 (0 l0 (0 LL a LL LL LL LL a a a d a o_ O O O O U O O O O O O N U U U U U U U U U U U U C (p C cp C cp C (p C (6 (p C N LL N LL Co LL N LL (0 LL LL (0 N N .N U 0 U 0 U Q U U U N N T (6 N T N (0 N 10 ` N N U N N N U N O N N O N U U U U U U U U U U U U CO r f- M fl V CO V M (O O 01 M O f` O co O1 (O O) (O N f- M M C` M Cl M M clJ M M N N M M M M c0 (O (O M M M r r O O o 0 0 0 O o 0 0 0 0 O O o 0 0 o O o 0 0 0 0 O LO O (O O (O O c0 O 0 0 N LO r M r M I` (O f- (O � h N M M co M co M M M M M N M LO m m M m N M m m O f� N QJ O M M M l0 r N r N N N N V r O f- O r O O r O M r N (O N M N M N M N (O (O r M m M M M V M V M V M V M M M M M M M M M N M M M M M M M M M M co N f` V M V M V M V M V M O C M M M M M M M M M (O O) N N N N N N N N N N N O (n (n (n (n (n (n (n (n (n (n It 'It N N r O r O f- O r O O M r N co N M N co N (O N M h r co (O co (O M (O M (O M 'O 4 Of M V' M V M It M M M M M n M M Co Co M N M M M M M M co M M M co f` f-- S 2 2 = S = 2 2= 2 2 T 0 N N O O O 2E 2E :5 N N N N N N co O a a n_ a O O O U U U (9 l6 (0 LL LL LL U N N U U U C C C N (0 (0 N N N U U U (O V r r M l0 V (O (n o O O o O O (O (O c0 r- N N M M N M M M (O OJ (O (q V (D N r r (O 7 (O f- M C M M cl) W O) N � r � m rn v M (O M V m M N N O LO M N c0 N M r- O> O V M M Cl) Q) O N O) O V M M M W O m r N M CO N I- O I'll (O co N m !P M 0 M M M ti l(] O (O M N O) � 112 M O M M M 2 2 Y Y Y Y N tl1 N N 0 0 0 0 0 0 0 0 l0 0 O O f- N r-_O wt` N IT r I-- V O M M M r M M V (O V (O O] M M N M M M r O 0 V O f- (O (O r N N O) M O (O O) (O M N N r N O O O r r r o M O N V (q V (O (O M l0 (O N N O O) O) V O n (O M r N N O M O l0 O) (O M N N f� c0 O O c0 � CO U) 4 g 0 U 10 U U U U U U F N N N cu U U >1 U Y Y z Y In U) Q ¢ O O U U li LL z u C7 + + — + 0 r) = 2 2 O O O O O LO O O r-, O O � O LO co O O O O LO O O M FO N m a0 � N r N 0 o 0 0 0 O o O o r- o O m O Lc] m o O M O m LO O O N 6 N r N N LLO v s— LO (9 (O El cN a 0 N .a N Q -0 O N C � U N N N p_ L N N yC O c6 (p N U Q co a 0 U O R N Ol m a M Of co O O R N U U) 4:36, May 04 2018 30 0- cu �20 m U) m c aU U 0 01 c 0 U 06 0 •111 1 H-1 04L3wp23 Ladder View 8000 10000 12000 14000 16000 18000 20000 Measured Depth Depth Fro@epth To Survey/Plan Tool 39.00 900.00 1 H-104wp23 (Plan: 1 H©'00�-GC-SS 900.00895.00 1H-104wp23 (Plan: 1HMVA?+IFR-AK-CAZ-SC 1895.05756.70 1 H-104wp23 (Plan: 1 HAI VA?+IFR-AK-CAZ-SC 5756.76200.00 1 H-104L3wp23 (Plan: MWID4W_ONLY 6200.09700.00 1 H-104L3wp23 (Plan: MWD41-3) 6200.09531.75 1 H-104L3wp23 (Plan: MWID4113-AK-CAZ-SC $ M � n O � y O 2 TVD MD Name 3667.5Y57.7(Y-5/8" x 9-7/8" 3908.71531.754 1 /2" x 6-3/4" cn N d 3 N V _O S � 5750 6000 6250 6500 6750 7000 7250 7500 Partial Measured Depth 9:35, May 04 2018 1 H-1 04L3wp23 TIC View SURVEY PROGRAM MD Inc Azi TVD Dleg TFace Target Annotation Depth Frol®epth To TOOI 756.70 76.63 99.60 3668.20 0.00 0.00 KOP: 15.9°/100' DLS, -20° TF, for 12.8' 39.00 900.00 GYD-GC-SS 69.50 78.54 98.89 3670.95 15.90 -20.00 Hold for 20' 89.50 78.54 98.89 3674.93 0.00 0.00 Start 4°/100' DLS, 4.56° TF, for 266.56' 900.001895.00 MWD+IFR-AK-CAZ-SC 356.06 89.17 99.73 3703.42 4.00 4.56 Hold for 282.6' 1895.005756.70 MWD+IFR-AK-CAZ-SC 338.66 89.17 99.73 3707.51 0.00 0.00 Start 1.5°/100' DLS, 172.62' TF, for 61.9' 00.56 88.25 99.85 3708.90 1.50 172.62 1 H-104L3 01.T01 09-11-17 RFAdjust TF to 170.93°, for 48.27' 5756.705200.00 MWD-INC_ONLY 448.83 87.53 99.96 3710.68 1.50 170.93 Hold for405.58' 6200.007700.00 MWD 354.41 87.53 99.96 3728.12 0.00 0.00 Start 3°/100' DLS,-88.49° TF, for 298.69' akdust TF to 6200.09531.75 MWD+IFR-AK-CAZ-SC 81. 3 88.04 84.116 3748.59 3.00 -88.14 1H-104L3 02.T02 09-14-17 csHold for 702.87 14°, for 227.93' 83.91 88.04 84.16 3772.67 0.00 0.00 Start 2°/100' DLS, 92.81 ° TF, for 142' 25.90 87.90 87.00 3777.70 2.00 92.81 1 H-1041-3 03703 09-11-17 RPAdjust TF to 91.42°, for 191.43' 17.33 87.81 90.83 3784.87 2.00 91.42 Hold for 2369.48' 86.82 87.81 90.83 3875.42 0.00 0.00 Start 2°/100' DLS, -93.21 ° TF, for 191.64' 78.46 87.60 87.00 3883.10 2.00 -93.21 1 H-104L3 T11 012318 RP Adjust TF to 12.58°, for 102.33' 80.79 89.60 87.45 3885.60 2.00 12.58 Hold for 204.13' 84.92 89.60 87.45 3887.04 0.00 0.00 Start 2.25°/100' DLS,-93.59° TF, for 2210 4 95.41 87.00 37.75 3957.10 2.25 -93.59 1 H-1041-3 T12 012318 RP Adjust TF to-179.44°, for 37.88' 33.29 86.15 37.74 3959.36 2.25-179.44 Hold for 175.61' 08.91 86.15 37.74 3971.16 0.00 0.00 Start 2.5°/100' DLS,-64.43° TF, for 354.E ' CASING DETAILS 63.56 90.00 29.75 3983.10 2.50 -64.43 1 H-104L3 T13 012318 RP Adjust TF to-63.16°, for 313.8' 77.35 93.53 22.74 3973.41 2.50 -63.16 Hold for 63.87' 41.22 93.53 22.74 3969.48 0.00 0.00 Start 2.25°/100' DLS, -72.6° TF, for 220.0 ' TVD M D Name 61.24 95.00 18.00 3953.10 2.25 -72.60 1 H-1041-3 T14 012318 RP Adjust TF to-94.77°, for 57.93' 19.16 94.89 16.70 3948.11 2.25 -94.77 Hold for 84.32' 3667.655757.70 7-5/8" x 9-7/8" 03.48 94.89 16.70 3940.92 0.00 0.00 Start 2.25°/100' DLS,-96.46° TF, for 600. 2 3908.1®7531.75 4 112" x 6-3/4" 04.00 93.25 3.25 3898.10 2.25 -96.46 1H-10413 T15 012318 RP Adjust TF to-121.40, for 163.19' 67.19 91.33 0.12 3891.57 2.25-121.40 Hold for 760.53' 27.72 91.33 0.12 3873.88 0.00 0.00 Start 2°/100' DLS, 176.37' TF, for 66.8' 94.52 90.00 0.20 3873.10 2.00 176.37 1 H-1041-3 T16 012318 RP Adjust TF to 171.17°, for 62.44' 56.96 88.77 0.39 3873.77 2.00 171.17 Hold for 219.15' 76.12 88.77 0.39 3878.49 0.00 0.00 Start 4°/100' DLS,-179.9° TF, for 169.15' 45.27 82.00 0.38 3892.10 4.00-179.90 1 H-1041-3 T17 012318 RP Adjust TF to-178.77°, for 25.73' 71.00 80.97 0.36 3895.91 4.00-178.77 Hold for 11.12' 82.12 80.97 0.36 3897.66 0.00 0.00 Start 4°/100' DLS, 0.42° TF, for 144.48' 26.60 86.75 0.40 3913.10 4.00 0.42 1 H-1041-3 T18 012318 RP Adjust TF to-0.36°, for 106.7' 33.29 91.02 0.37 3915.18 4.00 -0.36 Hold for 398.46' 31.75 91.02 0.37 3908.10 0.00 0.00 1 H-1041-3 T19 012318 RP To: 17531.75' MD, 3908.1' TVD 0 330 i 30 0 5757 5757 5950 5950 -- 6140 300 60 6140 6330 6330 6530 6530 ____ _. 6720 ;a 6720 - 6910 t 6910 7100 7100 -- 7540 7540 7980 270 ��� 90 7980 8410 8410 -_- 8850 8850 9290 9290 9720 11 9720 10160 10160 10600 10600 11470 11470 . - 12330 240 wai..�i ,/ __ n, 120 / 12330 13200 ! Al 13200 14070 14070 14930 14930 15800 15800 16670 210 ff �` %i� 150 16670 17532 1H-104wp23---------- 180 O co N Q J V Q Cl)CCD L co 0- M NCL 3 M J 7 O V O _ LO J i ■ N co N LO 3 U O CY) 0 U OJ S M C — N d O N J N O � 3 O O = _ L v O O O LO R LO TIC g- Z w o N = Q co r S No W W J = M J = N m QN O J o coJ O V = C? W O O M J d' O r m 0 N V O T A g (uiMsn 000£) 5ulglJON ConocoPhillips (Alaska) Inc. -Kup1 Kuparuk River Unit Kuparuk 1 H Pad Plan: 1 H-104 50029xxxxx00 Plan: 1 H-104L3 Plan: 1 H-104L3wp23 Error Ellipse Survey Report 04 May, 2018 Company: ConocoPhillips (Alaska) Inc. -Kupl Project: Kuparuk River Unit Site: Kuparuk 1 H Pad Well: Plan 1 H-104 Wellbore: Plan 11-1-1041-3 Design: 1 H-104L3wp23 Schlumberger Error Ellipse Report Local Co-ordinate Reference: Well Plan: 11-1-104 TVD Reference: Plan: 54 1+39 @ 93.10usft (Doyon 142) MD Reference: Plan 54.1+39 @ 93.10usft (Doyon 142) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: OAKE DM P2 Project Kuparuk River Unit, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site Kuparuk I Pad Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 usft Slot Radius: Well Plan: 1 H-104 Well Position +N/-S 0.00 usft Northing: +E/-W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore Plan:1H-104L3 Magnetics Model Name Sample Date BGGM2017 8/1/2017 Latitude: Longitude: 0 " Grid Convergence Latitude: Longitude: Ground Level: Declination Dip Angle (°) (°) 17.56 80.95 0.37 ° 54.10 usft Field Strength (nT) 57,494 F esign 1H-104L3wp23 udit Notes: Version: Phase: PLAN Tie On Depth: 5,756.70 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (I 39.00 0.00 0.00 0.00 Survey Tool Program Date 5/4/2018 From To (usft) (usft) Survey (Wellbore) Tool Name Description 39.00 900.00 1 H-104wp23 (Plan: 1 H-104) GYD-GC-SS Gyrodata gyro single shots 900.00 1,895.00 1 H-1 04wp23 (Plan: 1 H-1 04) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 1,895.00 5,756.70 1 H-1 04wp23 (Plan: 1 H-1 04) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5,756.70 6,200.00 1H-104L3wp23(Plan:1H-10413) MWD-INC_ONLY MWD-INC_ONLY_FILLER 6,200.00 7,700.00 1H-104L3wp23(Plan:1H-10413) MWD MWD- Standard 6,200.00 17,531.75 1H-104L3wp23(Plan:1H-1041-3) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 51412018 10:02:16AM Page 2 COMPASS 5000.14 Build 85 Company: ConocoPhillips (Alaska) Inc. -Kup1 Project: Kuparuk River Unit Site: Kuparuk 1 H Pad Well: Plan: 1 H-104 Wellbore: Plan: 1H-104L3 Design: 1H-104L3wp23 Plan Survey Tool Program Date 5/4/2018 Depth From Depth To (usft) (usft) Survey (Wellbore) 1 39.00 900.00 1 H-104wp23 (Plan: 1 H-104) 2 900.00 1,895.00 1 H-104wp23 (Plan: 1 H-104) Schlumberger Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Tool Name Remarks GYD-GC-SS Gyrodata gyro single shots M WD+I FR-AK-CAZ-SC MWD+IFR AK CAZ SCC 3 1,895.00 5,756.70 1H-104wp23 (Plan: 1H-104) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 4 5,756.70 6,200001H-104L3wp23(Plan 1H-1041-3 MWD-INC-ONLY MWD-INC-ONLY-FILLER 5 6,200.00 7,700.00 1H-104L3wp23 (Plan: 1H-104L3 MWD MWD - Standard 6 6,20000 17,531.75 1 H-1 04L3wp23 (Plan: 1 H-1 04L3 MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature 1.00 sigma OAKEDMP2 Position uncertainty and bias at survey station Measured inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semi+najor Semi -minor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (^j 5,756.70 76.63 99.60 3,668.20 5,93 -1.22 10.64 1.26 5.23 1.46 2.19 15.00 5.68 148.48 MWD-INC_ONLY (1, 4) 5,757.70 76.78 99.54 3,668.43 5.93 -1.22 10.64 1.26 5.23 1As 2.19 15.00 5.68 148.48 MWD-INC _ONLY (1, 4) 5,769.50 78.54 98.89 3,670.95 5.93 -1.22 10.64 1.26 5.23 1.46 2.19 15.00 5.68 148.48 MWD-INC_ONLY (1,4) 5,789.50 78.54 98.89 3,674.93 5.93 -1.22 10.68 1.26 5.23 1.46 2.20 15.01 5.72 148.37 MWD-INC_ONLY (1, 4) 5,800.00 78.96 98.92 3,676.98 5.89 -1.23 10.72 1.26 5.23 1.46 2.20 15.02 5.76 148.27 MWD-INC _ONLY (1, 4) 5,900.00 82.95 99.24 3,692.70 5.61 -1.32 11.91 1.25 5.26 1.47 2.24 15.42 6.86 144.43 MWD-INC_ONLY (1, 4) 6,000.00 86.94 99.56 3,701.51 5.43 -1.41 15.82 1.24 5.31 1.48 2.27 17.48 9.33 129.68 MWD-INC_ONLY (1, 4) 6,056.06 89.17 99.73 3,703.42 5.38 -1.46 19.53 1.24 5.35 1As 2.29 20.35 10.45 118.75 MWD-INC-ONLY (1, 4) 6,100.00 89.17 99.73 3,704.05 5.41 -1.46 23.17 1.24 5.39 1.48 2.30 23.62 10.98 112.39 MWD-INC_ONLY(1, 4) 6,172.35 89.17 99.73 3,705.10 5.46 -1.46 27.89 1.52 5.44 1.48 2.49 28.15 11.28 108.23 MWD(1, 5) 6,200.00 89.17 99.73 3,705.50 5.46 -1.46 27.89 1.52 5.44 1.48 2.49 28.15 11.28 108.23 MWD (1, 5) 6,300.00 89.17 99.73 3,706.95 5.49 -1.46 28.21 2.09 5.46 1.48 2.90 28.50 11.18 108.70 MWD (1, 5) 6,338.66 89.17 99.73 3,707.51 5.51 -1.46 28.36 2.32 5.48 1.48 3.07 28.67 11.15 108.85 MWD (1, 5) 6,400.00 88.26 99.85 3,708.88 5.57 -1.44 28.63 2.66 5.51 1.48 3.35 28.95 11.09 109.07 MWD (1, 5) 6,400.56 88.25 99.85 3,708.90 5.57 -1.44 28.63 2.66 5.51 1.48 3.35 28.95 11.09 109.07 MWD (1, 5) 6,448.83 87.53 99.96 3,710.68 5.63 -1.42 28.88 2.94 5.55 1.48 3.59 29.20 11.05 109.21 MWD (1, 5) 6,500.00 87.53 99.96 3,712.88 5.67 -1.42 29.15 3.23 5.59 1.48 3.84 29.49 11.01 109.33 MWD(1, 5) 6,600.00 87.53 99.96 3,717.18 5.77 -1.42 29.75 3.80 5.68 1.49 4.35 30.11 10.93 109.51 MWD (1, 5) 6,700.00 87.53 99.96 3,721.48 5.88 -1.42 30.44 4.37 5.80 1.49 4.87 30.82 10.86 109.60 MWD (1, 5) 6,800.00 87.53 99.96 3,725.78 6.02 -1.42 31.20 4.94 5.93 1.49 5.41 31.59 10.79 109.62 MWD (1, 5) 6,854.41 87.53 99.96 3,728.12 6.10 -1.42 31.65 5.25 6.02 1.49 5.70 32.05 10.76 109.60 MWD (1, 5) 6,900.00 87.57 98.60 3,730.07 6.17 -1.43 31.91 5.55 6.09 1.49 5.95 32.44 10.73 109.57 MWD (1, 5) 7,000.00 87.66 95.59 3,734.23 6.34 -1.44 32.48 6.19 6.26 1.49 6.49 33.34 10.66 109.39 MWD (1, 5) 7,100.00 87.75 92.59 3,738.24 6.53 -1.46 33.01 6.80 6.45 1.50 7.04 34.28 10.59 109.07 MWD(1, 5) 7,153.10 8T80 91.00 3,740.30 6.63 -1.47 33.28 7.12 6.56 1.50 7.33 34.80 10.56 108.85 MWD (1, 5) 7,200.00 87.85 89.59 3,742.08 6.73 -1.47 33.50 7.40 6.66 1.50 7.58 35.26 10.53 108.63 MWD (1, 5) 7,300.00 87.95 86.59 3,745.75 6.94 -1.49 33.96 7.97 6.88 1.50 8.12 36.26 10.47 108.07 MWD (1, 5) 7,381.03 88.04 84.16 3,748.59 7.12 -1.50 34.29 8.41 7.06 1.50 8.54 37.08 10.43 107.54 MWD (1, 5) 5/4/2018 10.02:16AM Page 3 COMPASS 5000.14 Build 85 Company: ConocoPhillips (Alaska) Inc. -Kup1 Project: Kuparuk River Unit Site: Kuparuk 1H Pad Well: Plan: 1 H-104 Wellbore: Plan: 1 H-1041-3 Design: 1 H-1D4L3wp23 Position uncertainty and bias at survey station Schlumberger Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature 1.00 sigma OAKEDMP2 Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semi -major Semi -minor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (°) 7,400.00 88.04 84.16 3,749.24 7.17 -1.50 34.49 8.51 7.11 1.50 8.64 37.27 10.42 107.41 MWD (1, 5) 7,425.15 88.04 84.16 3,750.10 7.41 -1.50 35.61 9.04 7.35 1.50 9.16 38.32 10.40 106.72 MWD (1, 5) 7,500.00 88.04 84.16 3,752.66 7.41 -1.50 35.61 9.04 7.35 1.50 9.16 38.32 10.40 106.72 MWD (1, 5) 7,600.00 88.04 84.16 3,756.09 7.66 -1.50 36.77 9.56 7.60 1.51 9.68 39.40 10.40 106.02 MWD (1, 5) 7,700.00 88.04 84.16 3,759.51 6.17 -1.45 28.02 1.67 6.10 1.51 2.81 30.36 10.82 108.52 MWD+IFR-AK-CAZ-SC (2, 5) 7,800.00 88.04 84.16 3,762.94 6.25 -1.45 28.24 1.67 6.19 1.51 2.84 30.58 10.79 108.38 MWD+IFR-AK-CAZ-SC (2, 5) 7,900.00 88.04 84.16 3,766.37 6.34 -1.45 28.47 1.67 6.27 1.51 2.88 30.80 10.76 108.21 MWD+IFR-AK-CAZ-SC (2,5) 8,000.00 88.04 84.16 3,769.79 6.43 -1.45 28.71 1.67 6.37 1.51 2.91 31.03 10.74 108.04 MWD+IFR-AK-CAZ-SC (2,5) 8,083.91 88.04 84.16 3,772.67 6.51 -1.45 28.92 1.67 6.45 1.52 2.94 31.23 10.73 107.89 MWD+IFR-AK-CAZ-SC (2,5) 8,100.00 88.02 84.48 3,773.22 6.52 -1.45 29.02 1.66 6.46 1.52 Z95 31.27 10.72 107.86 MWD+IFR-AK-CAZ-SC (2,5) 8,200.00 87.92 86.48 3,776.76 6.63 -1.44 29.63 1.59 6.56 1.52 2.98 31.51 10.71 107.69 MWD+IFR-AK-CAZ-SC (2, 5) 8,225.90 87.90 87.00 3,777.70 6.65 -1.44 29.78 1.57 6.59 1.52 2.99 31.57 10.71 107.65 MWD+IFR-AK-CAZ-SC (2, 5) 8,300.00 87.86 88.48 3,780.44 6.73 -1.44 30.22 1.52 6.66 1.52 3.02 31.76 10.70 107.53 MWD+IFR-AK-CAZ-SC (2, 5) 8,400.00 87.82 90.48 3,784.21 6.83 -1.44 30.79 1.44 6.77 1.52 3.06 32.02 10.69 107.38 MWD+IFR-AK-CAZ-SC (2,5) 8,417.33 87.81 90.83 3,784.87 6.85 -1.43 30.89 1.43 6.78 1.52 3.07 32.07 10.69 107.35 MWD+IFR-AK-CAZ-SC (2,5) 8,500.00 87.81 90.83 3,788+03 6.94 -1.43 31.13 1.43 6.87 1.52 3.10 32.29 10.69 107.23 MWD+IFR-AK-CAZ-SC (2,5) 8,600.00 87.81 90.83 3,791.85 7.05 -1.43 31.42 1.43 6.99 1.53 3.14 32.58 10.69 107.07 MWD+IFR-AK-CAZ-SC (2, 5) 8,700.00 87.81 90.83 3,795.67 7.16 -1.43 31.73 1.43 7.10 1.53 3.18 32.88 10.70 106.91 MWD+IFR-AK-CAZ-SC (2,5) 8,800.00 87.81 90.83 3,799.49 7.28 -1.43 32.04 1.43 7.22 1.53 3.22 33.18 10.70 106.74 MWD+IFR-AK-CAZ-SC (2, 5) 8,900.00 87.81 90.83 3,803.31 7.40 -1.43 32.36 1.43 7.33 1.53 3.27 33.49 10.71 106.57 MWD+IFR-AK-CAZ-SC (2,5) 9,000.00 87.81 90.83 3,807.14 7.52 -1.43 32.69 1.43 7.46 1.53 3.31 33.80 10.72 106.40 MWD+IFR-AK-CAZ-SC (2, 5) 9,100.00 8T81 90.83 3,810.96 7.64 -1.43 33.02 1.43 7.58 1.54 3.35 34.13 10.73 106.22 MWD+IFR-AK-CAZ-SC (2, 5) 9,200.00 87.81 90.83 3,814.78 7.76 -1.43 33.37 1.43 7.71 1.54 3.40 34.46 10.74 106.04 MWD+IFR-AK-CAZ-SC (2,5) 9,300.00 87.81 90.83 3,818.60 7.89 -1.43 33.71 1.43 7.83 1.54 3.44 34.79 10.75 105.87 MWD+IFR-AK-CAZ-SC (2, 5) 9,400.00 87.81 90.83 3,822.42 8.02 -1.43 34.07 1.43 7.96 1.54 3.48 35.13 10.76 105.68 MWD+IFR-AK-CAZ-SC (2, 5) 9,500.00 87.81 90.83 3,826.24 8.15 -1.43 34.43 1.43 8.09 1.54 3.53 35.48 10.78 105.50 MWD+IFR-AK-CAZ-SC (2,5) 9,600.00 87.81 90.83 3,830.07 8.28 -1.43 34.80 1.43 8.23 1.55 3.57 35.83 10.79 105.32 MWD+IFR-AK-CAZ-SC (2,5) 9,700.00 87.81 90.83 3,833.89 8.42 -1.43 35.17 1.43 8.36 1.55 3.62 36.19 10.81 105A4 MWD+IFR-AK-CAZ-SC (2,5) 9,800.00 87.81 90.83 3,837.71 8.55 -1.43 35.55 1.43 8.50 1.55 3.67 36.56 10.82 104.95 MWD+IFR-AK-CAZ-SC (2,5) 9,900.00 87.81 90.83 3.841.53 8.69 -1.43 35.93 1.43 8.64 1.55 3.71 36.93 10.84 104.77 MWD+IFR-AK-CAZ-SC (2,5) 10,000.00 87.81 90.83 3,845.35 8.83 -1.43 36.32 1.43 8.78 1.55 3.76 37.30 10.86 104.59 MWD+1FR-AK-CAZ-SC (2.5) 10,100.00 87.81 90.83 3,849.17 8.97 -1.43 36.72 1.43 8.92 1.56 3.80 37.68 10.88 104.41 MWD+IFR-AK-CAZ-SC (2, 5) 10,200.00 87.81 90.83 3,853.00 9.11 -1.43 37.12 1.43 9.06 1.56 3.85 38.07 10.90 104.23 MWD+IFR-AK-CAZ-SC (2,5) 10,255.05 87.81 90.83 3,865.10 9.26 -1.43 37.52 1.43 9.21 1.56 3.90 38.46 10.92 104.05 MWD+IFR-AK-CAZ-SC (2,5) 10,300.00 87.81 90.83 3,856.82 9.26 -1.43 37.52 1.43 9.21 1.56 3.90 38.46 10.92 104.05 MWD+IFR-AK-CAZ-SC (2,5) 10,400.00 87.81 90.83 3,860.64 9A0 -1.43 37.93 1.43 9.35 1.56 3.95 38.86 10.94 103.87 MWD+IFR-AK-CAZ-SC (2,5) 10,500.00 87.81 90.83 3,864.46 9.55 -1.43 38.35 1.43 9.50 1.57 4.00 39.26 10.96 103.70 MWD+IFR-AK-CAZ-SC (2,5) 10,600.00 87.81 90.83 3,868.28 9.69 -1.43 38.77 1.43 9.65 1.57 4.04 39.66 10.98 103.52 MWD+IFR-AK-CAZ-SC (2,5) 10,700.00 87.81 90.83 3,872.10 9.84 -1.43 39.19 1.43 9.79 1.57 4.09 40.07 11.00 103.35 MWD+IFR-AK-CAZ-SC (2, 5) 10,786.82 87.81 90.83 3,875.42 9.97 -1.43 39.56 1.43 9.92 1.57 4.13 40.43 11.02 103.21 MWD+IFR-AK-CAZ-SC (2,5) 10,800.00 87.80 90.57 3,875.93 9.99 -1.43 39.58 1.45 9.94 1.57 4.14 40.48 11.02 103.18 MWD+IFR-AK-CAZ-SC (2,5) 10,900.00 87.68 88.57 3,879.87 10.15 -1.43 39.68 1.57 10.09 1.57 4.19 40.88 11.04 103.01 MWD+IFR-AK-CAZ-SC (2, 5) 10,978.46 87.60 87.00 3,883.10 10.27 -1.43 39.74 1.67 10.21 1.58 4.23 41.19 11.06 102.87 MWD+IFR-AK-CAZ-SC (2,5) 11,000.00 88.02 87.09 3,883.92 10.29 -1.45 39.85 1.66 10.24 1.58 4.24 41.28 11.06 102.83 MWD+IFR-AK-CAZ-SC (2,5) 11,080.79 89.60 87.45 3,885.60 10.38 -1.55 40.26 1.64 10.37 1.58 4.28 41.62 11.09 102.67 MWD+IFR-AK-CAZ-SC (2,5) 11,100.00 89.60 87.45 3,885.74 10.41 -1.55 40.35 1.64 10.40 1.58 4.28 41.70 11.09 102.63 MWD+IFR-AK-CAZ-SC (2,5) 11,200.00 89.60 87.45 3,886.44 10.56 -1.55 40.79 1.64 10.55 1.58 4.33 42.12 11.12 102.43 MWD+IFR-AK-CAZ-SC (2,5) 11,284.92 89.60 87.45 3,887.04 10.69 -1.55 41.16 1.64 10.68 1.58 4.37 42.48 11.14 102.26 MWD+IFR-AK-CAZ-SC (2, 5) 11,300.00 89.58 87.11 3,887.15 10.71 -1.55 41.17 1.66 10.70 1.58 4.37 42.54 11.15 102.24 MWD+IFR-AK-CAZ-SC (2,5) 11,400.00 89.44 84.86 3,888.01 10.87 -1.54 41.16 1.81 10.86 1.58 4.42 42.94 11.17 102.05 MWD+IFR-AK-CAZ-SC (2,5) 11,500.00 89.30 82.62 3,889.11 11.03 -1.53 41.09 1.95 11.01 1.58 4.46 43.34 11.19 101.84 MWD+IFR-AK-CAZ-SC (2,5) 11,600.00 89.16 80.37 3,890.46 11.19 -1.53 40.97 2.10 11.17 1.58 4.50 43.74 11.22 101.61 MWD+IFR-AK-CAZ-SC (2,5) 11,700.00 89.02 78.12 3,892.05 11.36 -1.52 40.79 2.24 11.33 1.58 4.55 44.13 11.25 101.37 MWD+IFR-AK-CA7-SC (2, 5) 11,800.00 88.88 75.88 3,893.88 11.52 -1.51 40.55 2.38 11.49 1,58 4.59 44.51 11.29 101.11 MWD+IFR-AK-CAZ-SC (2, 5) 5/4/2018 10:02:16AM Page 4 COMPASS 5000.14 Build 85 Company: ConocoPhillips (Alaska) Inc. -Kupl Project: Kuparuk River Unit Site: Kuparuk 1 H Pad Well: Plan: 1 H-104 Wellbore: Plan: 1 H-1041-3 Design: 1H-104L3wp23 IPosition uncertainty and bias at survey station Schlumberger Error Ellipse Report Local Co-ordinate Reference TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature 1.00 sigma OAKEDMP2 Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semi -major Semi-rninor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (°) 11,900.00 88.75 73.63 3,895.95 11.69 -1.50 40.25 2.52 11.64 1.58 4.63 44.88 11.32 100.84 MWD+IFR-AK-CAZ-SC (2,5) 12,000.00 88.62 71.38 3,898.24 11.85 -1.50 39.90 2.66 11.80 1.58 4.67 45.25 11.36 100.55 MWD+IFR-AK-CAZ-SC (2,5) 12,100.00 88.49 69.14 3,900.77 12.02 -1.49 39.49 2.80 11.96 1.59 4.72 45.61 11.41 100.25 MWD+IFR-AK-CAZ-SC (2,5) 12,200.00 88.36 66.89 3,903.51 12.19 -1.49 39.02 2.93 12.12 1.59 4.76 45.96 11.45 99.94 MWD+IFR-AK-CAZ-SC (2, 5) 12,300,00 88.24 64.64 3,906.48 12.36 -1.49 38.50 3.06 12.28 1.59 4.80 46.30 11.50 99.61 MWD+IFR-AK-CAZ-SC (2,5) 12,400.00 88.11 62.39 3,909.67 12.54 -1.48 37.93 3.19 12.44 1.59 4.84 46.62 11.56 99.28 MWD+IFR-AK-CAZ-SC (2,5) 12,500.00 87.99 60.15 3,913.07 12.71 -1.48 37.31 3.32 12.60 1.59 4.87 46.94 11.62 98.94 MWD+IFR-AK-CAZ-SC (2,5) 12,600.00 87.88 57.90 3,916.67 12.89 -1.48 36.63 3.44 12.77 1.59 4.91 47.25 11.68 98.59 MWD+IFR-AK-CAZ-SC (2,5) 12,700.00 87.76 55.65 3,920.47 13.07 -1.48 35.90 3.56 12.93 1.60 4.95 47.55 11.75 98.23 MWD+IFR-AK-CAZ-SC (2,5) 12,800.00 87.65 53.40 3,924.47 13.25 -1.48 35.13 3.68 13.09 1.60 4.98 47.83 11.82 97.86 MWD+IFR-AK-CAZ-SC (2,5) 12,900.00 87.55 51.15 3,928.66 13.43 -1.48 34.30 3.80 13.25 1.60 5.02 48.10 11.90 97.49 MWD+IFR-AK-CAZ-SC (2,5) 13,000.00 87.45 48.90 3,933.02 13.61 -1.48 33.44 3.91 13.42 1.60 5.05 48.36 11.99 97.12 MWD+IFR-AK-CAZ-SC (2, 5) 13,100.00 87.35 46.65 3,937.57 13.80 -1.48 32.53 4.01 13.58 1.61 5.09 48.60 12.08 96.74 MWD+IFR-AK-CAZ-SC (2, 5) 13,200.00 87.25 44.40 3,942.28 13.98 -1.48 31.59 4.12 13.74 1.61 5.12 48.84 12.18 96.36 MWD+IFR-AK-CAZ-SC (2,5) 13,300.00 87.16 42.15 3,947.15 14.16 -1.49 30.61 4.22 13.91 1.61 5.15 49.06 12.29 95.97 MWD+IFR-AK-CAZ-SC (2,5) 13,400.00 87.08 39.90 3,952.17 14.35 -1.49 29.60 4.31 14.07 1.62 5.18 49.26 12.41 95.59 MWD+IFR-AK-CAZ-SC (2,5) 13,495.41 87.00 37.75 3,957.10 14.53 -1.50 28.61 4.40 14.23 1.62 5.20 49.45 12.52 95.22 MWD+IFR-AK-CAZ-SC (2,5) 13,500.00 86.90 37.75 3,957.34 14.55 -1.49 28.62 4.40 14.24 1.62 5.21 49.46 12.53 95.20 MWD+IFR-AK-CAZ-SC (2,5) 13,533.29 86.15 37.74 3,959.36 14.72 -1.46 28.70 4.40 14.29 1.62 5.22 49.50 12.53 95.11 MWD+IFR-AK-CAZ-SC (2,5) 13,600.00 86.15 37.74 3,963.85 14.83 -1.46 28.89 4.40 14.40 1.62 5.24 49.61 12.54 94.91 MWD+IFR-AK-CAZ-SC (2, 5) 13,700.00 86.15 37.74 3,970.56 15.00 -1.46 29.22 4.40 14.57 1.63 5.27 49.80 12.56 94.55 MWD+IFR-AK-CAZ-SC (2,5) 13,708.91 86.15 37.74 3,971.16 15.01 -1.46 29.25 4.40 14.58 1.63 5.27 49.82 12.57 94.51 MWD+IFR-AK-CAZ-SC (2,5) 13,800.00 87.13 35.68 3,976.50 15.02 -1.51 28.26 4.48 14.74 1.63 5.29 49.99 12.64 94.17 MWD+IFR-AK-CAZ-SC (2,5) 13,900.00 88.22 33.43 3,980.56 15.05 -1.56 27.19 4.57 14.90 1.63 5.32 50.17 12.77 93.78 MWD+IFR-AK-CAZ-SC (2,5) 14,000.00 89.31 31.18 3,982.72 15.11 -1.61 26.10 4.65 15.07 1.63 5.34 50.33 12.91 93.39 MWD+IFR-AK-CAZ-SC (2,5) 14,063.56 90.00 29.75 3,983.10 15.18 -1.63 25.41 4.70 15.18 1.63 5.36 50.43 13.01 93.14 MWD+IFR-AK-CAZ-SC (2, 5) 14,100.00 90.41 28.94 3,982.97 15.22 -1.65 25.01 4.73 15.24 1.63 5.36 50.49 13.07 93.00 MWD+IFR-AK-CAZ-SC (2, 5) 14,200.00 91.54 26.71 3,981.27 15.37 -1.68 23.94 4.80 15.40 1.63 5.38 50.63 13.25 92.62 MWD+IFR-AK-CAZ-SC (2,5) 14,300.00 92.67 24.47 3,977.60 15.56 -1.71 22.89 4.87 15.57 1.63 5.39 50.75 13.44 92.23 MWD+IFR-AK-CAZ-SC (2,5) 14,377.35 93.53 22.74 3,973.41 15.75 -1.72 22.09 4.92 15.70 1.63 5.40 50.84 13.60 91.93 MWD+IFR-AK-CAZ-SC (2,5) 14,400.00 93.53 22.74 3,972.02 15.79 -1.72 22.16 4.92 15.74 1.63 5.40 50.87 13.63 91.85 MWD+IFR-AK-CAZ-SC (2,5) 14,441.22 93.53 22.74 3,969.48 15.86 -1.72 22.27 4.92 15.81 1.63 5.41 50.91 13.65 91.72 MWD+IFR-AK-CAZ-SC (2,5) 14,500.00 93.93 21.48 3,965.65 15.99 -1.72 21.67 4.95 15.91 1.63 5.41 50.97 13.73 91.51 MWD+IFR-AK-CAZ-SC (2,5) 14,600.00 94.59 19.32 3,958.22 16.24 -1.72 20.73 5.00 16.07 1.62 5.42 51.07 13.95 91.14 MWD+IFR-AK-CAZ-SC (2,5) 14,661.24 95.00 18.00 3,953.10 16.40 -1.72 20.18 5.03 16.18 1-62 5.43 51.12 14.10 90.92 MWD+IFR-AK-CAZ-SC (2, 5) 14,700.00 94.93 17.13 3,949.75 16.46 -1.71 19.81 5.05 16.24 1.62 5.43 51.15 14.18 90.78 MWD+IFR-AK-CAZ-SC (2,5) 14,719.16 94.89 16.70 3,948.11 16.49 -1.71 19.62 5.06 16.27 1.62 5.43 51.17 14.21 90.72 MWD+IFR-AK-CAZ-SC (2,5) 14,800.00 94.89 16.70 3,941.22 16.62 -1.71 19.85 5.06 16.41 1.62 5.44 51.23 14.32 90.46 MWD+IFR-AK-CA7-SC (2,5) 14,803.48 94.89 16.70 3,940.92 16.62 -1.71 19.86 5.06 16.42 1.62 5.44 51.23 14.32 90.45 MWD+IFR-AK-CAZ-SC (2,5) 14,900.00 94.64 14.53 3,932.90 16.76 -1.69 18.93 5.10 16.58 1.62 5.44 51.29 14.45 90.15 MWD+IFR-AK-CAZ-SC (2,5) 15,000.00 94.38 12.29 3,925.03 16.89 -1.67 18.09 5.14 16.75 1.61 5.45 51.35 14.65 89.84 MWD+IFR-AK-CAZ-SC (2,5) 15,100.00 94.11 10.05 3,917.63 17.03 -1.65 17.36 5.17 16.91 1.61 5.45 51.40 14.86 89.53 MWD+IFR-AK-CAZ-SC (2,5) 15,200.00 93.83 7.81 3,910.71 17.17 -1.64 16.77 5.19 17.08 1.61 5.46 51.44 15.09 89.24 MWD+IFR-AK-CAZ-SC (2, 5) 15,300.00 93.55 5.58 3,904.27 17.31 -1.62 16.34 5.21 17.25 1.60 5.46 51.47 15.32 88.96 MWD+IFR-AK-CAZ-SC (2,5) 15,400.00 93.26 3.34 3,898.33 17.46 -1.61 16.07 5.22 17.42 1.60 5.46 51.49 15.57 88.70 MWD+IFR-AK-CAZ-SC (2,5) 15,404.00 93.25 3.25 3,898.10 17.47 -1.61 16.06 5.22 17.43 1.60 5.46 51.49 15.58 88.68 MWD+IFR-AK-CAZ-SC (2,5) 15,500.00 92.12 1.41 3,893.60 17.57 -1.60 15.99 5.22 17.59 1.60 5.46 51.50 15.79 88.46 MWD+IFR-AK-CAZ-SC (2,5) 15,567.19 91.33 0.12 3,891.57 17.67 -1.60 16.00 5.22 17.71 1.60 5.46 51.50 15.93 88.32 MWD+IFR-AK-CAZ-SC (2,5) 15,600.00 91.33 0.12 3,890.81 17.73 -1.60 16.05 5.22 17.76 1.60 5.46 51.51 15.97 88.25 MWD+IFR-AK-CAZ-SC (2,5) 15,700.00 91.33 0.12 3,888.48 17.90 -1.60 16.14 5.22 17.93 1.60 5.46 51.51 16.04 88.02 MWD+IFR-AK-CAZ-SC (2, 5) 15,800.00 91.33 0.12 3,886.16 18.07 -1.60 16.24 5.22 18.10 1.60 5.46 51.52 16.12 87.79 MWD+IFR-AK-CAZ-SC (2,5) 15,900.00 91.33 0.12 3,883.83 18.24 -1.60 16.37 5.22 18.28 1.60 5.46 51.53 16.23 87.56 MWD+IFR-AK-CAZ-SC (2,5) 16,000.00 91.33 0.12 3,881+50 18.41 -1.60 16.52 5.22 18.45 1.60 5.46 51.54 16.35 87.33 MWD+IFR-AK-CAZ-SC (2,5) 16,100.00 91.33 0.12 3,879.18 18.58 -1.60 16.69 5.22 18.62 1.59 5.46 51.54 16.49 87.10 MWD+IFR-AK-CAZ-SC (2,5) 5/4/2018 10:02:16AM Page 5 COMPASS 5000.14 Build 85 Company: ConocoPhillips (Alaska) Inc. -Kup1 Project: Kuparuk River Unit Site: Kuparuk I Pad Well: Plan: 1 H-104 Wellbore: Plan:1H-104L3 Design: 1 H-104 L3wp23 Position uncertainty and bias at survey station Schlumberger Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature 1.00 sigma OAKEDMP2 Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semiana)or Semi -minor Depth Depth Error Bias Error Bias Ertor Bias of Bias Error Error Azimuth Tool (usft) (°) (°) (usft) {usft) (usft) (usft) (usft) (usft). (usft) (usft) (usft) (usft) M 16,200.00 91.33 0.12 3,876.85 18.75 -1.60 16.88 5.22 18.79 1.59 5.46 51.56 16.65 86.86 MWD+IFR-AK-CAZ-SC (2,5) 16,300.00 91.33 0.12 3,874.52 18.92 -1.60 17.08 5.22 18.96 1.59 5.46 51.57 16.82 86.63 MWD+IFR-AK-CAZ-SC (2,5) 16,327.72 91.33 0.12 3,873.88 18.97 -1.60 17.14 5.22 19.01 1.59 5.46 51.57 16.87 86.56 MWD+IFR-AK-CAZ-SC (2,5) 16,394.52 90.00 0.20 3,873.10 19.12 -1.59 17.21 5.22 19.12 1.59 5.47 51.57 16.91 86.45 MWD+IFR-AK-CAZ-SC (2, 5) 16,400.00 89s9 0.22 3,873.11 19.14 -1.59 17.21 5.22 19.13 1.59 5.47 51.58 16.91 86.45 MWD+IFR-AK-CAZ-SC (2, 5) 16,456.96 88.77 0.39 3,873.77 19.33 -1.58 17.19 5.22 19.23 1.59 5.47 51.58 16.86 86.40 MWD+IFR-AK-CAZ-SC (2, 5) 16,500.00 88.77 0.39 3,874.70 19.40 -1.58 17.23 5.22 19.30 1.59 5.47 51.58 16.88 86.33 MWD+IFR.AK-CAZ-SC (2,5) 16,600.00 88.77 0.39 3,876.85 19.57 -1.58 17.47 5.22 19.48 1.59 5.48 51.60 17.08 86.09 MWD+IFR-AK-CAZ-SC (2,5) 16,676.12 88.77 0.39 3,878.49 19.70 -1.58 17.66 5.22 19.61 1.59 5.48 51.61 17.25 85.91 MWD+IFR-AK-CAZ-SC (2,5) 16,700.00 87.81 0.39 3,879.21 19.85 -1.57 17.69 5.22 19.65 1.59 5.48 51.61 17.27 85.87 MWD+IFR-AK-CAZ-SC (2,5) 16,800.00 83.81 0.38 3,886.51 20.80 -1.53 17.66 5.22 19.82 1.60 5.49 51.62 17.23 85.78 MWD+IFR-AK-CAZ-SC (2,5) 16,845.27 82.00 0.38 3,892.10 21.38 -1.50 17.66 5.22 19.90 1.60 5.49 51.62 17.21 85.74 MWD+IFR-AK-CAZ-SC (2,5) 16,871.00 80.97 0.36 3,895.91 21.75 -1.49 17.65 5.22 19.94 1.61 5.50 51.62 17.21 85.71 MWD+IFR-AK-CAZ-SC (2, 5) 16,882.12 80.97 0.36 3,897.66 21.76 -1.49 17.67 5.22 19.96 1.61 5.50 51.62 17.22 85.69 MWD+IFR-AK-CAZ-SC (2,5) 16,900.00 81.69 0.36 3,900.35 21.56 -1.50 17.72 5.22 19.99 1.61 5.50 51.63 17.26 85.65 MWD+IFR-AK-CAZ-SC (2,5) 17,000.00 85.69 0.39 3,911.35 20.71 -1.56 17.99 5.22 20.16 1.62 5.51 51.65 17.49 85.40 MWD+IFR-AK-CAZ-SC (2,5) 17,026.60 86.75 0.40 3,913.10 20.56 -1.57 18.07 5.22 20.20 1.62 5.52 51.65 17.55 85.34 MWD+IFR-AK-CAZ-SC (2, 5) 17,100.00 89.69 0.38 3,915.38 20.35 -1.62 18.27 5.22 20.33 1.62 5.52 51.66 17.73 85.16 MWD+IFR-AK-CAZ-SC (2,5) 17,133.29 91.02 0.37 3,915.18 20.35 -1.64 18.37 5.22 20.39 1.62 5.53 51.67 17.81 85.07 MWD+IFR-AK-CAZ-SC (2,5) 17,200.00 91.02 0.37 3,913.99 20.46 -1.64 18.56 5.22 20.50 1.62 5,53 51.68 17.98 84.90 MWD+IFR-AK-CAZ-SC (2,5) 17,300.00 91.02 0.37 3,912.22 20.64 -1.64 18.87 5.22 20.68 1.62 5.54 51.70 18.24 84.65 MWD+IFR-AK-CAZ-SC (2,5) 17,400.00 91.02 0.37 3,910.44 20.81 -1.64 19.19 5.22 20.85 1.62 5.55 51.72 18.52 84.39 MWD+IFR-AK-CAZ-SC (2,5) 17,500.00 91.02 0.37 3,908.66 20.98 -1.64 19.52 5.22 21.02 1.62 5.55 51.74 18.80 84.12 MWD+IFR-AK-CAZ-SC (2, 5) 17,531.75 91.02 0.37 3,908.10 21.04 -1.64 19.63 5.22 21.08 1.62 5.56 51.75 18.90 84.04 MWD+IFR-AK-CAZ-SC (2,5) 51412018 10.02:16AM Page 6 COMPASS 5000.14 Build 85 Schlumberger Error Ellipse Report Company: ConocoPhillips (Alaska) Inc. -Kupl Local Co-ordinate Reference: Well Plan: 1 H-104 Project: Kuparuk River Unit TVD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Site: Kuparuk 1 H Pad MD Reference: Plan: 54.1+39 @ 93.10usft (Doyon 142) Well: Plan: 1H-104 North Reference: True Wellbore: Plan: 1 H-1041-3 Survey Calculation Method: Minimum Curvature Design: 1 H-104L3wp23 Output errors are at 1.00 sigma Database: OAKEDMP2 Design Targets Target Name hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Shape V) (I (usft) (usft) (usft) 1H-1041-30130109-11- 0.00 0.00 3,708.90 -2,573.85 1,721.94 - plan hits target center - Circle (radius 1,320.00) 1 H-1041-3 01301 09-11- 0.00 0.00 3,708.90 -2,573.85 1,721.94 plan hits target center Circle (radius 100.00) 1 H-1041-3 02302 09-14- 0.00 0.00 3,740.30 -2,680.75 2,465.33 - plan hits target center - Circle (radius 100.00) 1 H-1041-3 03303 09-11- 0.00 0.00 3,777.70 -2,588.74 3,533.06 - plan hits target center - Circle (radius 100.00) 1H-1041303.T0309-11- 0.00 0.00 3,777.70 -2,588.74 3,533.06 - plan hits target center - Circle (radius 1,320.00) 1H-1041-3T16012318F 0.00 0.00 3,873.10 1,105.43 9,207.99 - plan hits target center - Circle (radius 100.00) 1 H-1041-3 T11 012318 R 0.00 0.00 3,883.10 -2,615.81 6,283.21 - plan hits target center - Circle (radius 100.00) 1H-1041-3 T11 012318 R 0.00 0.00 3,883.10 -2,615.81 6,283.21 - plan hits target center - Circle (radius 1,320.00) 1H-1041-3 T17 012318 F 0.00 0.00 3,892.10 1,555.47 9,210.94 - plan hits target center - Circle (radius 100.00) 1 H-1041-3 T15 012318 F 0.00 0.00 3,898.10 115.36 9,201.49 - plan hits target center - Circle (radius 1,320.00) 1 H-1041-3 T15 012318 F 0.00 0.00 3,898.10 115.36 9,201.49 - plan hits target center - Circle (radius 100.00) 1 H-1041-3 T19 012318 F 0.00 0.00 3,908.10 2,240.52 9,215.44 - plan hits target center - Circle (radius 1,320.00) 1 H-1041-3 T19 012318 F 0.00 0.00 3,908.10 2,240.52 9,215.44 - plan hits target center - Circle (radius 100.00) 1 H-104L3 T18 012318 F 0.00 0.00 3,913.10 1,735.48 9,212.13 plan hits target center Circle (radius 100.00) 1H-1041-3 T14 012318 F 0.00 0.00 3,953.10 -608.78 9,056.72 - plan hits target center - Circle (radius 100.00) 1 H-1041-3 T12 012318 F 0.00 0.00 3,957.10 -1,617.18 8,490.03 - plan hits target center - Circle (radius 100.00) 1H-1041-3T13012318F 0.00 0.00 3,983.10 -1,154.27 8,817.11 - plan hits target center - Circle radius 1 320.00 5/4/2018 10:02:16AM Page 7 COMPASS 5000.14 Build 85 Company: ConocoPhillips (Alaska) Inc. -Kupl Project: Kuparuk River Unit Site: Kuparuk 1 H Pad Well: Plan: 1 H-104 Wellbore: Plan: 1H-104L3 Design: 1 H-104L3wp23 Schlumberger Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: 1 H-1041-3 T13 012318 F 0.00 0.00 3,983.10-11154.27 8,817,11 plan hits target center Circle (radius 100.00) Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature 1.00 sigma OAKEDMP2 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name 118.10 118.10 20" x 42" 20 42 1,892.22 1,800.00 10 3/4" 10-3/4 13-1/2 5,757.70 3,667.65 7-5/8" x 9-7/8" 7-5/8 9-7/8 17,531.75 3,908.10 41/2"x6-3/4" 4-1/2 6-3/4 Formations Measured Vertical Depth Depth (usft) (usft) 1,715.19 1,649.10 PFROST 1,916.38 1,820.10 T-3 2,158.44 2,018.10 K-15 3,381.94 2,901.10 UG_C 3,942.92 3,134.10 UG_B 4,239.85 3,235.10 UG_A 4,536.38 3,335.10 Na 5,397.38 3,585.10 WS_D 5,648.16 3,643.10 WS_C 5,754.99 3,667.10 WS_B 6,172.35 3,705.10 WS_A4 7,425.15 3,750.10 WS_A3 10,255.05 3,855.10 WS_A2 Name Dip Dip Direction Lithology (1 (1) 5/4/2018 10:02:16AM Page 8 COMPASS 5000.14 Build 85 Company: ConocoPhillips (Alaska) Inc. -Kupl Project: Kuparuk River Unit Site: Kuparuk I Pad Well: Plan: 1 H-104 Wellbore: Plan: 1 H-104L3 Design: 1H-104L3wp23 Plan Annotations Schlumberger Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: 1 H-104 Plan: 54.1+39 @ 93.10usft (Doyon 142) Plan: 54.1+39 @ 93.10usft (Doyon 142) True Minimum Curvature 1.00 sigma OAKEDMP2 Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 5,756.70 3,668.20 -2,467.70 1,089.59 KOP: 15.9°/100' DLS, -20' TF, for 12.8' 5,769.50 3,670.95 -2,469.71 1,101.93 Hold for20' 5,789.50 3,674.93 -2,472.74 1,121.30 Start 4*/100' DLS, 4.56' TF, for 266.56' 6,056.06 3,703.42 -2,515.57 1,382.45 Hold for282.6' 6,338.66 3,707.51 -2,563.33 1,660.96 Start 1.5*/100' DLS, 172.62' TF, for 61.9' 6,400.56 3,708.90 -2,573.85 1,721.94 Adjust TF to 170.93°, for 48.27' 6,448.83 3,710.68 -2,582.15 1,769.46 Hold for 405.58' 6,854.41 3,728.12 -2,652.26 2,168.56 Start 3*/100' DLS,-88.49' TF, for 298.69' 7,153.10 3,740.30 -2,680.75 2,465.33 Adjust TF to-88.14°, for 227.93' 7,381.03 3,748.59 -2,671.13 2,692.77 Hold for 702.87' 8,083.91 3,772.67 -2,599.68 3,391.59 Start 2'/100' DLS, 92.81 ° TF, for 142' 8,225.90 3,777.70 -2,588.74 3,533.06 Adjust TF to 91.42°, for 191.43' 8,417.33 3,784.87 -2,585.12 3,724.28 Hold for 2369.48' 10,786.82 3,875.42 -2,619.43 6,091.79 Start 2'/100' DLS, -93.21 ° TF, for 191.64' 10,978.46 3,883.10 -2,615.81 6,283.21 Adjust TF to 12.58°, for 102.33' 11,080.79 3,885.60 -2,610.85 6,385.38 Hold for 204.13' 11,284.92 3,887.04 -2,601.75 6,589.31 Start 2.25°/l00' DLS,-93.59' TF, for 2210.49' 13,495.41 3,957.10 -1,617.18 8,490.03 Adjust TF to-179.44°, for 37.88' 13,533.29 3,959.36 -1,587.27 8,513.18 Hold for 175.61' 13,708.91 3,971.16 -1,448.72 8,620.43 Start 2.5'/100' DLS,-64.43° TF, for 354.65' 14,063.56 3,983.10 -1,154.27 8,817.11 Adjust TF to-63.16°, for 313.8' 14,377.35 3,973.41 -873.18 8,955.72 Hold for 63.87' 14,441.22 3,969.48 -814.39 8,980.36 Start 2.25'/100' DLS, -72.6° TF, for 220.02' 14,661.24 3,953.10 -608.78 9,056.72 Adjust TF to-94.77°, for 57.93' 14,719.16 3,948.11 -553.69 9,073.92 Hold for 84.32' 14,803.48 3,940.92 -473.23 9,098.06 Start 2.25'/100' DLS,-96.46° TF, for 600.53' 15,404.00 3,898.10 115.36 9,201.49 Adjust TF to-121.4°, for 163.19' 15,567.19 3,891.57 278.32 9,206.27 Hold for 760.53' 16,327.72 3,873.88 1,038.64 9,207.81 Start 2'/100' DLS, 176.37' TF, for 66.8' 16,394.52 3,873.10 1,105.43 9,207.99 Adjust TF to 171.17°, for 62.44' 16,456.96 3,873.77 1,167.87 9,208.31 Hold for219.15' 16,676.12 3,878.49 1,386.97 9,209.81 Start 4'/100' DLS,-179.9' TF, for 169.15' 16,845.27 3,892.10 1,555.47 9,210.94 Adjust TF to-178.77°, for 25.73' 16,871.00 3,895.91 1,580.91 9,211.11 Hold for 11.12' 16,882.12 3,897.66 1,591.90 9,211.18 Start 4'/100' DLS, 0.42' TF, for 144.48' 17,026.60 3,913.10 1,735.48 9,212.13 Adjust TF to-0.36°, for 106.7' 17,133.29 3,915.18 1,842.13 9,212.85 Hold for 398.46' 17,531.75 3,908.10 2,240.52 9,215.44 TD: 17531.75' MD, 3908.1' TVD Checked By: Approved By: Date: 5/4/2018 10:02 16AM Page 9 COMPASS 5000.14 Build 85 Pool Report M O O 3 O i � N sosso �ososeaso ' o � omoom O U -2 -2 4Ugg. \ O NaUUU2.T W yU UUUU UU UUU U UU UUUU_U.iJ _... _. _. _... Q \ U, O Z \ U a ¢ o0000 Imor'r' 0 00000 moi ri rirc�vi 4+" O O O w 00 � CI 6 39 J � o a m CLw W� w a:a car a a a�aaaaa�aaaaa O 00000 mm mmmmmm NNNNNN NNN NN. t - - O moo oornms7€QL�01, F-r-1-HI- 9 t Lo Gz;" �=�-rrr'-������ eccev ea a 'm'-'JJJJJ 00 000000o ham£ a � -r 7 CD a rn a M M S rr N M 8 £ 8t O O 0 �f "tQMM MM 00 M O O W N 3 N N 9 � j •� C. > N �p N loot O t �bst. ti! �p m tit oa t !� 8dlp., a _ � � 1P O O O d. i co 0 N ',.. Q O O O O O O O O O O O O O O O O O C° Iui/}}sn oob�) (+)u;aoN/(-)u}noS cv d 1 H-104L3wp23 Surface Location M CPAI Coordinate Converter { o { 0- __ -- From: _ _ -- —------- -- __ _ _ �--_—�-- — - - — -�-� To: Datum: NApg3 Region: alaska Datum: NAD27 Region: alaska.....�_-. w LatitudeiLongitude Decimal Degrees ; Latitude/Longitude Decimal Degrees i I— UTM Zone: I— F South E UTM Zone: True South i t State Plane Zone: 4 Units: us ft �. State Plane Zone: 4 Units: us ft Legal Description (NAD27 only) I C` Legal Description (NAD27 only) Starting Coordinates: - -- —I Ending Coordinates: - - X: 11689600.36 X: 549568.736474514 Y: 5980534.24 Y: 5980782.43086254 Transform Quit Help 1 H-104L3wp23 Surface Casing CPAs?Coordinate Con,eerter From: _ _ _ ___ To: Datum: NAD83 Region: alaskaDatum: i �NAD-27 Region: alaska LatitudeiLongitude Decimal Degrees Latitude/Longitude Decimal Degrees UTM Zone: ( South f- UTM Zone: True South 4-State Plane Zone:., 4 � Units: us-fk � �" Skate Plane Zone: � Units: us-ft I 4 ,_. Legal Description (NAD27 only) C Legal Description (NAD27 only) .--- _...____.___________._.._....__._._. Starting Coordinates: ___.. ___.__. - Ending Coordinates: 1689232.43 X: 549200.810385368� Y: 5980276.76 Y: 5980524.96388168 .... ..... ............... Transform Quit Help 1 H-104L3wp23 Top of Window CPA[ Coordinate Converter Datum: NAD83 7,] Region: alaska { ' Latitude/Longitude Decimal Degrees UTM Zone: r South 4' State Plane Zone: 4 + Units: us-ft + Legal Description (NAD27 only) Starting Coordinates: X: ji66070E03 Y: 15978073.98 i n I To: Datum: NAD27 Region: alaska _+ r Latitude/Longitude Decimal Degrees +j r UTM Zone: True South f*` Skate Plane Zone: Units: us ft + r Legal Description (NAD27 only) Ending Coordinates: i i i X: 550674.373237508 I Y: 5978322.20801044 .......................................................... Transform Quit Help 1 H-104L3wp23 Top of Production Horizon rj CPAz-CoordinateCon-ver'ter �. [ o I O ( 1 From: Datum: JUD83 Region: jalaska r Latitude/Longitude IDecimalDegrees UTM Zone: r— South State Plane Zone: 4 Units:us-ft t— Legal Description (NAD27 only) --------------------- Starting Coordinates: X: 1690 661 To: Datum: jNR527 Region: alaska Latitude/Longitude Decimal Degrees ,"' UTM Zone: True r South t State Plane Zone: 4 Units: us-ft + (— Legal Description (NAD27 only) Ending Coordinates: X: 550329.348949870 I Y: 5970378.23318258 ..-- Transform Quit Help 1H-104L3wD23 TD 1 E!3, CPA7 Coordinate Converter 7 ��� t = [ UJI I I rom: Datum: INAD83 Region: Fa_I,,ka Latitude/Longitude Decimal Degrees t- UTM Zone: r— r South State Plane Zone: 14 ;1 Units: [,u­S.`ft---,j Legal Description (NAD27 only) - - ---- - ---- ---- tarting Coordinates: X: 1098-800 Y: 15982835 To:___ ----- Datum: FNA�D27� Region: 1,_j,­,k-, ;I r Latitude/Longitude [Decimal Degrees t- UTM Zone: fTrue— r- South Stake Plane Zone: Units: us ft r Legal Description (NAD27 only) ----------- - Ending Coordinates: ---- X: 558768.255038833 Y: 5983082.96155_79 --------- - ----- - ...Transform Quit H elp 1 H-104L3wp23 Surface Location 1!3. CPS;; Coordinate Converter�- From: - — - - — Datum: INZ83 Dw Region: alaska _- Latitude/Longitude Decimal Degrees r UTM Zone: �� (" South Skate Plane Zone: 4 Units: us it i Legal Description tNt' D 1-17 CFnlY) a Starting Coordinates: _ ------ X: 11689600.36 3 Y: 15980534.24 i 1 H-104L3wp23 Surface Casin CRAI Coordinate Converter From: Datum: NAD83 T Region: alaska C' Latitude/Longitude Decimal Degrees r UTM Zone: I— South r` State Plane Zone: 14 Units: us-ft Datum: jNA577 I Region: alaska f- Latitude/Longitude Decimal Degrees r UTM Zone: True South I" State Plane Zone: 4 Units: us ft T Legal Description (NAD27 only) Legal Description �i Township: 012 N Range: 010 E . I Meridian: JU Section: 28 . FNL 15200.5597 FEL 772.31441 ......................................................... Transform Quit Help Starting Coordinates: X: 11689232.43 YT 5980276 76 # To: - -- Datum: NAD27 Region: alaska - i Latitude/Longitude Decimal Degrees UTM Zone: True South State Plane Zone: 14 1 Units: us ft Legal Description (NAD27 only) Legal Description Township: 012 N . Range: 010 E . Meridian: I� Sectiorr' 3g FNL 1175.62581 IFF .111142.5333 Transform Quit Help I H-104L3wp23 Top of Window CPAI Coordinate Converte:r S rom: Datum: FN-A-D-8-3----,l Region: alaska r Latitude/Longitude DecimalDegrees r UTM Zone: I F South r- Skate Plane Zone: 14 Units: 1us-.ft tarting Coordinates: -------- X: 1690706.03 Y: 15978073.98 T o: Datum: INAD27 Region: 1;1;;ka I- Latitude/Longitude iDecimal Degrees UTM Zone: FT —rue r South Skate Plane Zone: R-�- Units: I us-ft Legal Description (NAD27 only) Legal Description Township: [0-12 FN---,] Range: [0-10 Meridian: U Section:134 JFNL 2388.3815 FFE L --I 49E3386 Transform ................................................. —2-UitHelp—j ... I H-104L3wp23 Top of Production Horizon CPAj C,nvrtea, From: Datum: fN--A-D--B3---,-1 Region: alaska r Latitude/Longitude IDecimal Degrees r UTM Zone: F— F South r* State Plane Zone: 14 T Units: ]us-ft r Legal D e.,�cripooi , !N'AD 2-7 on. ! Starting Coordinates: ....... ...... .... X: 11690361 Y: 5978130 I U. Datum: rN—ADZI Region: fa`lask-a---�j f- Latitude/Longitude Decimal Degrees UTM Zone: [True South State Plane Zone: Units: us-ft Legal Description (NAD27 only) Legal Township: 01-2 Range: F01-0 Meridian: Section:F33— FNL j f2330.0321 FEL f32 894349 ........................................................... Transform Quit Help .......................................................... IH-104U CPA! Coordinate Converter As -built REV I DATE I BY I CK I APP DESCRIPTION 77TREV I DATE BY CK APP DESCRIPTION 1 2/05/0 MRT I CC I Rev. Per K05014ACS 1 2 02/01/1 JAH I LGM Rev. Per K170005ACS N3D 29 28 27 25 1 -- - 1 'a6 31 1H US 32 33,734 35 36 T12NRl E T11NR of 6 5 4 3 2 1 0120 1 Kam. — — rA - ASP GRID NORTH 0119 CPF1 '� 7 10 . c 0118 a 9 (sO�tiF 11 12 0117 �o 0116 0.115 18 7 16 15 "4 13 0114 1E LEGEND 0113 0112 1F -- 1D 24 sill 24 15 s 20 21 2 23 O AS —BUILT CONDUCTOR silo VICINITY MAP • EXISTING CONDUCTOR 0109 SCALE: 1" = 2 MILES 0104 0108 0103 28 27 33 34102 0'�� 0106 0101 •20 •19 •22 •17 •16 •15 •l •2 •3 04 •UGNU 01 •14 •5 •12 •11 010 •6 •21 •13 •9 •7 •18 NOTES: 1. BASIS OF LOCATION AND ELEV. IS DS1H MONUMENTATION PER LOUNSBURY & ASSOC. 2. COORDINATES SHOWN ARE ALASKA STATE PLANE, ZONE 4, N.A.D. 27, AND GEODETIC COORDINATES ARE NAD 27. 3. ELEVATIONS ARE B.P.M.S.L. 4. ALL CONDUCTORS ARE LOCATED WITHIN PROTRACTED SECTIONS 28 AND 33, TOWNSHIP 12 NORTH, RANGE 10 EAST, UMIAT MERIDIAN, ALASKA. 5. DATES OF SURVEY: 12-26-16 THRU 1-31-17 FIELD BOOKS L16-35, L16-40, L17-02 & L17-03. 6. ALL DISTANCES SHOWN ARE GROUND. GRAPHIC SCALE 0 100 200 4D0 •g 1 inch = 200 ft. SEE SHEET 2 & 3 FOR COORDINATE TABLE LOUNSBURY & ASSOCUTES, INC. SURVEYORS ENGINEERS PLANNERS 46 AREA:IH MODULE: XXXX UNIT: D1 ConocoPhilli S DS1H WELL CONDUCTOR Alaska, Inc. ASBUILT LOCATIONS CADD FILE NO. DRAWING NO. PART. REV: LK6108d31 2 05 05 CEA-D1 HX-6108D31 1 OF 3 1 2 J 11 12/05/01MRT I CC I IRev. Per K05014ACS 12 102/01/11 JAH I LGM I IRev. Per K170005ACS CONDUCTORS ARE LOCATED IN PROTRACTED SECTION 33, T. 12 N., R. 10 E., UMIAT MERIDIAN Well No. NAD 27 ASP Coordinates NAD 27 Geographic Coordinates Section Offset. Elev. Y X Lat. Long. F.N.L F.E.L O.G. PAD 1 5,979,969.32' 549,197.55' N 70' 21' 21.836" W 149' 36' 01.664" 732' 1151' 49.9' 54.4' 2 5,979,939.43' 549,199.75' N 70' 21' 21.542" W 149' 36' 01.605" 762' 1149' 49.8' 54.2' 3 5,979,909.70' 549,201.04' N 70' 21' 21.249" W 149' 36' 01.573" 791' 1148' N/A N/A 4 5,979,789.20' 549,210.20' N 70* 21' 20.064" W 149' 36' 01.328" 911' 1140' N/A N/A 5 5,980,174.54' 549,543.27' N 70' 21' 23.832" W 149' 35' 51.517" 528' 803' N/A N/A 6 5,980,054.85' 549,551.90' N 70' 21' 22.654" W 149' 35' 51.288" 648' 796' N/A N/A 7 5,979,935.13' 549,560.55' N 70' 21' 21.476" W 149' 35' 51.058" 768' 788' N/A N/A 8 5,979,815.46' 549,569.18' N 70' 21' 20.299" W 149' 35' 50.829" 888' 781' N/A N/A 9 5,979,964.85' 549,559.64' N 70' 21' 21.769" W 149' 35' 51.079" 738' 789, 50.2' 54.6' 10 5,980,084.49' 549,550.97' N 70' 21' 22.946" W 149' 35' 51.309" 619' 796' 50.3' 54.4' 11 5,980,114.39' 549,548.80' N 70' 21' 23.240" W 149' 35' 51.367" 589' 798' 50.4, 54.3, 12 5,980,144.15' 549,546.49' N 70' 21' 23.533" W 149' 35' 51.428" 559, 800, 50.3' 54.3, 13 5,979,993.93' 549,557.42' N 70' 21' 22.055" W 149' 35' 51.138" 709' 791' 50.3' 54.4, 14 5,980,204.14' 549,542.05' N 70' 21' 24.123" W 149' 35' 51.547" 499' 804' 50.1' 54.2' 15 5,979,999.18' 549,195.34' N 70' 21' 22.130" W 149' 36' 01.722" 702' 1153' 50.0' 54.5' 16 5,980,029.08' 549,192.10' N 70' 21' 22.424" W 149' 36' 01.811" 671' 1156' N/A N/A 17 5,980,058.86' 549,191.00' N 70' 21' 22.717" W 149' 36' 01.838" 642' 1156' 49.7' 54.4' 18 5,979,904.84' 549,564.14' N 70' 21' 21.178" W 149' 35' 50.959" 799' 785' 50.4' 54.5' 19 5,980,118.88' 549,186.59' N 70' 21' 23.308" W 149' 36' 01.955" 582' 1160' 49.5' 54.6' 20 5,980,148.10' 549,183.14' N 70' 21' 23.595" W 149' 36' 02.050" 552' 1164' N/A N/A 21 5,980,024.57' 549,555.22' N 70' 21' 22.356" W 149' 35' 51.196" 679' 793' 50.2' 54.4' 22 5,980,089.04' 549,188.93' N 70' 21' 23.014" W 149' 36' 01.893" 612' 1158, 49.6' 54.7' UGNU 01 5 980,234.12' ' 549,542.20' N 70' 21' 24.418" W 149' 35' 51.536" 469' 804' 50.0' 54.1' *101 5,980,602.66' 549,581.92' N 70' 21' 28.040" W 149' 35' 50.304" 101' 761' 48.0' 54.0' *102 5,980,662.56' 549,577.46' N 70' 21' 28.630" W 149' 35' 50.423" 41' 765' 48.0' 54.0, *106 5,980,632.86' 549,579.90' N 70' 21' 28.337" W 149' 35' 50.357" 70' 762' 48.0' 54.0' *107 5,980,692.31' 549,575.52' N 70' 21' 28.922" W 149' 35' 50.474" 11' 766' 48.0' 54.0' * CONDUCTOR ASBUILT THIS SURVEY LOUNSBURY & ASSOCUTES, INC. �w SURVEYORS ENGINEERS PLANNERS AREA:IH MODULE: XXXX UNIT: D1 ConocoPhillips DS1H WELL CONDUCTOR Alaska, Inc. ASBUILT LOCATIONS rCADD FILE NO. DRAWING N0. PART: REV: LK6108d31 2 05 05 CEA-D1 HX-6108D31 2 of 3 2 11 102/01/11 JAH I LGM I lCreate Per K170005ACS CONDUCTORS ARE LOCATED IN PROTRACTED SECTION 28, T. 12 N., R. 10 E., UMIAT MERIDIAN Well No. NAD 27 ASP Coordinates NAD 27 Geographic Coordinates Section Offset. Elev. Y X Lot. Long. F.S.L F.E.L. O.G. PAD *103 5,980,722.55' 549,573.20' N 70' 21' 29.220" W 149' 35' 50.536" 19' 768' 48.0' 54.1' *104 5,980,782.43' 549,568.74' N 70' 21' 29.809" W 149' 35' 50.655" 79' 772' 48.0' 54.1' *108 5,980,752.52' 549,570.98' N 70' 21' 29.515" W 149' 35' 50.595" 49' 770' 48.0' 54.0' *109 5,980,812.20' 549,566.50' N 70' 21' 30.102" W 149' 35' 50.714" 109' 774' 48.0' 54.0' *110 5,980,842.21' 549,564.40' N 70' 21' 30.398" W 149' 35' 50.770" 139' 776' 48.0' 54.0' *111 5,980,872.05' 549,562.21' N 70' 21' 30.691" W 149' 35' 50.828" 169' 778' 48.0' 54.1' *112 5,980,902.08' 549,559.94' N 70' 21' 30.987" W 149' 35' 50.889" 199' 780' 48.0' 54.0' *113 5,980,932.00' 549,557.76' N 70' 21' 31.281" W 149' 35' 50.947" 229' 782' 48.0' 54.0' *114 5,980,961.86' 549,555.50' N 70' 21' 31.575" W 149' 35' 51.006" 259' 784' 48.0' 54.1' *115 5,980,991.68' 549,553.43' N 70' 21' 31.868" W 149' 35' 51.062" 289' 786' 48.0' 54.1' *116 5,981,021.61' 549,551.58' N 70' 21' 32.163" W 149' 35' 51.1101, 319' 787' 48.0' 54.1' *117 5,981,051.73' 549,548.80' N 70' 21' 32.459" W 149' 35' 51.185" 349' 790' 48.0' 54.0' *118 5,981,081.22' 549,546.95' N 70' 21' 32.750" W 149' 35' 51.234" 378' 791' 48.0' 54.0' *119 5,981,111.42' 549,544.52' N 70' 21' 33.047" W 149' 35' 51.299" 408' 794' 48.0' 54.2' *120 5,981,141.33' 549,542.48' N 70' 21' 33.341" W 149' 35' 51.353" 438' 795' 48.0' 54.1' * CONDUCTOR ASBUILT THIS SURVEY • OF =••APE " ':�` •1 1� SURVEYOR'S CERTIFICATE A d '.. 1 HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND 49th !ll���VVV LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF 0 ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY 0,''�"""""""""""""""""^""'0 DONE BY ME OR UNDER MY DIRECT SUPERVISION AND .JEREMIAH F. CORNELL.- ,0 THAT ALL DIMENSIONS AND OTHER DETAILS PER THIS REVISION OV �� s��•;.• LS-12663 ,�"AV ARE CORRECT AS OF JANUARY 31, 2017. pR�•............�P�♦a�••• LOUNSBURY �O`FESSIONA0w 1�& & ASSOCIATES, INC. �`'"�`�'• SUURR`VEYORS ENGINEERS PLANNERS AREA:IH MODULE: XXXX UNIT: D1 ConocoPhillips DS1H WELL CONDUCTOR Alaska, Inc. ASBUILT LOCATIONS CADD FILE NO. DRAWING NO. PART: REV: LK6108d31 12 27 16 CEA-D1HX-6108D31 3 OF 3 1 Fixed BOP configuration for West SakOperations 1H-104 Drillinf4 Hazards Summary 13-1/2" Open Hole / 10-3/4" Casina Interval Hazard Risk Level Mitigation Strategy Broach of Conductor Low Monitor cellar continuously during interval. Gas Hydrates Moderate Reduced pump rates, Reduced drilling fluid temperatures, Additions of ScreenKleen Running Sands and Gravels Low Maintain planned mud parameters, Increase mud weight, use weighted sweeps. Hole swabbing on trips Moderate Trip speeds, proper hole filling (use of trip sheets), pumping out Washouts / Hole Sloughing Low Cool mud temperatures, minimize circulating times when possible Anti -Collision Moderate Follow real time surveys very closely, shut in nearby wells that we have collision concerns with, gyro survey to ensure survey accuracy. 9-7/8" Open Hole / 7-5/8" CasinM Interval Hazard Risk Level I Mitigation Strategy Running Sands and Gravels Low Maintain planned mud parameters, increase mud weight, use weighted sweeps. Stuck Pipe Low Good hole cleaning, pre-treatment with lost circulation material, stabilized BHA, decreased mud weight. Abnormal Reservoir Pressure Low BOP training and drills, increased mud weight. Lost circulation Moderate Reduced pump rates, mud rheology, LCM. Hole swabbing on trips Moderate Trip speeds, proper hole filling (use of trip sheets), pumping out. 6-3/4" Open Hole / 4-1/2" Liner Intervals Hazard Risk Level I Mitigation Strategy Abnormal Reservoir Pressure Low Stripping drills, shut-in drills, increased mud weight. Stuck Pipe Low Good hole cleaning, PWD tools monitoring and analysis, decreased mud weight if possible if pipe does get stuck. Lost Circulation Moderate ., Reduced pump rates, mud rheology, LCM program, additional fluid stored on location during completion run. Differential Sticking Moderate Follow mud program, keep pipe moving when able. Hole Swabbing on Trips Moderate Trip speeds, proper hole filling (use of trip sheets), pumping out or backreamin . Fault Crossings and Concretions Moderate Use developed best practices for concretion drilling. Anti -Collision Moderate Follow real time surveys very closely, shut in nearby wells that we have collision concerns with. Utilize periscope to maintain geological certainty to stay within zone. Casing wear Moderate Maintain low dog legs in the surface interval and utilize super sliders for drilling, milling, and liner running operations to minimize casing wear. Consider logging casing thickness to calibrate casing wear model. Getting Liner to Bottom Moderate Properly clean hole on the trip out with the BHA, perform clean out run if necessary, utilize super sliders for weight transfer, monitor torque and drag. Whipstock Retrieval Moderate A dedicated clean out run prior to attempting to pull whipstock can be used to reduce the risk of fishing operations. 1H-104 Drilling Hazards Summary.doc 511712018 9:34:53 AM ov D Email g z sm cu r g Onto m i o 0 O v I 1 Z tD D r m ---i F- � r m 0 o = r D O o C Z7 D < Z G) F-m u 1-1 EJ Co TRANSMITTAL LETTER CHECKLIST WELL NAME: PTD: ✓ Development Service Exploratory Stratigraphic Test _ Non -Conventional FIELD:Z � POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. 2%v�-�j(U / , API No. 50_0 - -Q"i - cb. (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -) from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) Regulation 20 AAC 25.071, and composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, WEST SAK OIL - 490150 PTD#:2180640 Company CONOCOPHILLIPS ALASKA, INC. Initial Class/Type Well Name: KUPARUK RIV U WSAK 1H-104L3 Program DEV Well bore seg ❑�/ DEV / PEND GeoArea 890 Unit 11160 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven, gas conforms to AS31.05.030(j.1.A),(j.2.A-D) NA 1 Permit fee attached 2 Lease number appropriate Yes Surf Loc & Top Prod Int lie in ADL0025639, TD lies in ADL0025638. 3 Unique well name and number Yes 4 Well located in a defined pool Yes Kuparuk River, West Sak Oil Pool - 490150, governed by CO 406C 5 Well located proper distance_ from drilling unit boundary Yes CO 406C, Rule 3; no restrictions as to well spacing except that no pay shall be opened in a_well closer 6 Well located proper distance from other wells_ Yes than 500 feet to an external_ property line where ownership or landownership changes. 7 Sufficient acreage available in drilling unit - Yes Well is more than 500 feet from an external property line. 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Appr Date 11 Permit can be issued without conservation order Yes 12 Permit can be issued without administrative approval Yes SFD 5/21/2018 13 Can permit be approved before 15-day wait Yes 14 Well located within area and strata authorized by Injection Order # (put_ 10# in comments) (For_: _NA 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre -produced injector: duration of pre -production less than 3 months (For service well only) NA 18 Conductor string_ provided NA Conductor set in KRU 1H-104 Engineering 19 Surface casing protects all known_ USDWs NA Surface casing will be set in KRU 1H-104 120 CMT vol adequate to circulate on conductor & surf csg NA Surface casing will be fully cemented 121 CMT vol adequate to tie-in long string to surf csg NA 22 CMT will cover all known productive horizons No Productive interval will be completed with u_ncemented slotted liner 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate_tan_kage_or reserve pit Yes Rig has steel tanks; all waste to approved disposal wells 25 If a re -drill, has_a 10-403 for abandonment been approved NA 26 Adequate wellbore separation_ proposed - Yes Anti -collision analysis complete; no major risk failures j27 If diverter required, does it meet regulations - NA Appr Date 128 Drilling fluid program schematic & equip list adequate Yes Max formation pressure is 1640 psig(8.6 ppg EMW); will drill w/ 8.8-9.5 ppg EMW VTL 5/31/2018 29 BOPEs, do they meet regulation Yes 30 BOPE-press rating appropriate; test to _(put psig in comments)_ - Yes MPSP is 1274 psig; will test BOPs to 3500 psig 31 Choke manifold complies w/API RP-53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas_ probable Yes H2S measures required 34 Mechanical condition of wells within AOR verified (For service well only) NA ------- -- - - 135 Permit can be issued w/o hydrogen sulfide measures - No_ H2S measures required. Well 1H-102 measured 20 ppm H2S_ on November 20, 2017. Geology 136 Data presented on potential overpressure zones Yes Expected res. pressure is -8.4 ppg EMW; production hole will be drilled with 9.2 - 9.5 ppg mud, Appr Date '37 Seismic analysis of shallow gas zones NA SFD 5/21/2018 38 Seabed condition survey (if off -shore) NA 39 Contact name/phone for weekly progress reports [exploratory only] NA_ Geologic Engineering Public Date: Date Date Commissioner: Com�F-t.. � /// m issi e