Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout219-029/`/I C) ��`
Davies, Stephen F (CED)
From: Davies, Stephen F (CED)
Sent: Wednesday, July 24, 2019 10:29 AM
To: Guhl, Meredith D (CED); Colombie, Jody J (CED); 'tom.mckay@bluecrest.com'
Cc: Roby, David S (CED); Schwartz, Guy L (CED); Rixse, Melvin G (CED)
Subject: RE: REQUEST TO CANCEL PTD_Hansen H13_PTD 219-023_23July2019
Done: Well H-13 and all associated well branches cancelled in RBDMS database (PTDs 219-023 thru 219-030) and
removed from Geographix database. Conservation Orders 768 thru 775 marked as cancelled in RBDMS and on the
website. Copies of this email thread have been printed and they will be scanned and placed in all affected well history
files and order files.
Thanks,
Steve D
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission
(AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use
or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding
it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies alaska.gov.
From: Davies, Stephen F (CED)
Sent: Wednesday, July 24, 2019 9:S8 AM
To: Guhl, Meredith D (CED) <meredith.guhl@alaska.gov>; Colombie, Jody J (CED) <jody.colombie@alaska.gov>;
tom.mckay@bluecrest.com
Cc: Roby, David S (CED) <dave.roby@alaska.gov>; Schwartz, Guy L (CED) <guy.schwartz@alaska.gov>; Rixse, Melvin G
(CED) <melvin.rixse@alaska.gov>
Subject: RE: REQUEST TO CANCEL PTD_Hansen H13_PTD 219-023_23July2019
The eight associated spacing exception Conservation Orders must be cancelled too.
Thanks,
Steve D
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission
(AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use
or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding
it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov.
From: Guhl, Meredith D (CED) <meredith.guhl@alaska.gov>
Sent: Wednesday, July 24, 2019 9:09 AM
To: Colombie, Jody J (CED) <[ody.colombie@alaska.gov>; tom.mckay@bluecrest.com
Cc: Davies, Stephen F (CED) <steve.davies@alaska.gov>; Roby, David S (CED) <dave.roby@alaska.gov>; Schwartz, Guy L
(CED) <guy.schwartz@alaska.gov>; Rixse, Melvin G (CED) <melvin.rixse@alaska.gov>
Subject: RE: REQUEST TO CANCEL PTD_Hansen H13_PTD 219-023_23July2019
I have updated Hansen H-13 (PTD 219-023) and seven associated laterals H-13 L01 through H-13 L07 (PTDs 219-024
through 219-030) as Canceled.
Meredith
Meredith Guhl
Petroleum Geology Assistant
Alaska Oil and Gas Conservation Commission
333 W. 7th Ave, Anchorage, AK 99501
meredith.guhl@alaska.gov
Direct: (907) 793-1235
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.
The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail,
please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at
907-793-1235 or meredith.guhl@alaska.gov.
From: Colombie, Jody J (CED) <jody.colombie@alaska.gov>
Sent: Wednesday, July 24, 2019 9:03 AM
To: Rixse, Melvin G (CED) <melvin.rixse@alaska.gov>; tom.mckay@bluecrest.com
Cc: Davies, Stephen F (CED) <steve.davies@alaska.gov>; Roby, David S (CED) <dave.robv@alaska.gov>; Schwartz, Guy L
(CED) <guy.schwartz@alaska.gov>; Guhl, Meredith D (CED) <meredith.guhl@alaska.gov>
Subject: RE: REQUEST TO CANCEL PTD—Hansen H13—PTD 219-023_23July2019
To m,
Once the AOGCC cancels PTD 219-023, BlueCrest Alaska will not need a bond for this well.
Jody
From: Tom McKay <tom.mckay@bluecrestenergy.com>
Sent: Tuesday, July 23, 2019 2:23 PM
To: Schwartz, Guy L (CED) <guy.schwartz@alaska.gov>; Rixse, Melvin G (CED) <melvin.rixse@alaska.gov>
Cc: 'Tom McKay' <tom.mckay@bluecrestenergy.com>;'Andrew Buchanan' <abuchanan@bluecrestenergy.com>
Subject: REQUEST TO CANCEL PTD—Hansen H13—PTD 219-023_23July2019
Guy and Mel,
Please be advised that BlueCrest Alaska requests the cancellation of the H13 approved PTD (PTD No. 219-023)
since we have no current plans to drill this well at this time.
The well API Number is 50-231-20065-00-00, FYI.
BlueCrest understands that since this PTD will be cancelled, that no further bonding expenses by the AOGCC
would be incurred on H13.
Please advise if this is not the case, and if there are any issues with cancelling and voiding this PTD.
Thanks and best regards,
Tom McKay
Principal Drilling Engineer
BlueCrest
907-350-9544 cell
907-754-9566 office
tom.mckay@bluecrestenergy.com
THE STAT L Alaska Oil and Gas
OfA L SK--A- A COnser vation Commission
333 West Seventh Avenue
GOVERNOR MIKE DUNLEAVY Anchorage, Alaska99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Larry Burgess
Alaska Manager
B1ueCrest Alaska Operating, LLC
3301 C Street, Suite 202
Anchorage, AK 99503
Re: Hansen Field, Undefined Oil Pool, H13-L06
B1ueCrest Alaska Operating, LLC
Permit to Drill Number: 219-029
Surface Location: 2344' FSL, 1524' FEL, SEC. 2, T4S, R15W, SM
Bottomhole Location: 158' FSL, 4740' FEL, SEC. 21, T3S, R15W, SM
Dear Mr. Burgess:
Enclosed is the approved application for the permit to drill the above referenced development well
The permit is for a new wellbore segment of existing well Permit No. 219-023, API No. 50-231-20065-00-
00. Production should continue to be reported as a function of the original API number stated above.
The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce is contingent
upon issuance of a conservation order approving a spacing exception. B1ueCrest Alaska Operating, LLC
assumes the liability of any protest to the spacing exception that may occur.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must
be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well.
This permit to drill does not exempt you from obtaining additional permits or an approval required by law
from other governmental agencies and does not authorize conducting drilling operations until all other
required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw
the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC
order, or the terms and conditions of this permit may result in the revocation or suspension of the permit.
Sincerely,
0-f
Daniel T. Sea unt, Jr.
Commiss' er{
DATED this J day of March, 2019.
STATE OF ALASKA
ALA, t OIL AND GAS CONSERVATION COMMIS: .J FEB 2019
PERMIT TO DRILL
20 AAC 25.005
1a. Type of Work: lb.. Proposed Well Class: Exploratory -Gas ❑Service - WAG ElService - Disp ❑
1 c. Specify if well is proposed for:
Drill ✓ Lat tratigraphic Test FIT Developmen_t_-- Oil, ❑ Service - Winj ❑ Single Zone ❑✓
Coalbed Gas ❑ Gas Hydrates
❑
ev Redrill Reentry xploratory - Oil De opt - Gas Service - Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas
❑
2. Operator Name:
5. Bond: Blanket a Single Well ❑
11. Well Name and Number:
BlueCrest Alaska Operating LLC
Bond No. 5511251547 •
H13 - L06
3. Address:
6. Proposed Depth:
12. Field/Pool(s):
3301 "C" Street, Suite 202, An,,^,horage, AK 99503
MD: 22,772' TVD: 6,730'
Hansen, Undefined Oil Pool
4a. Location of Well (Governmental Section):
7. Property Designation: /�>,L_ -3�I ` c
Surface: 2344' FSL, 1524' FEL, Sec. 2, T4S, R15W SM
ADL 18790, ADL 384403, Fee -Hansen
1 3'1i
Top of Productive Horizon:
8. DNR Approval Number:
13. Approximate Spud Date:
4798' FSL, 3729' FEL, Sec. 28, T3S, R15W SM
LOCI 14-007
3/10/2019
Total Depth:
9. Acres in Property:
14. Distance to Nearest Property:
158' FSL, 4740' FEL, Sec. 21, T3S, R15W SM
14423
3049' (YO1665)
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL (ft): 180.65 -
15. Distance to Nearest Well Open
Surface: x- 168845 y- 2144793.15 . Zone- 4
GL / BF Elevation above MSL (ft): 146.2
to Same Pool: 3200' - H14
16. Deviated wells: Kickoff depth: 21500 feet
17. Maximum Potential Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 115 degrees
Downhole: 3,549 psi Surface: 2,842 psi (using 7,070' TVD)
18. Casing Program:
Specifications
Top - Setting Depth - Bottom
Cement Quantity, c.f. or sacks
Hole
Casing
Weight
Grade
Coupling
I Length
MD
TVD
MD
TVD
(including stage data)
Driven
20
0.5" wall
A252
Welded
152
41
41
193
193
N/A - Rotary Drilled / Driven
17.5
13.375
72
L-80
BTC
4759
40
40
4799
3528
Lead: 564 bbls, 13.0 ppg Class A
Tail: 154 bbls 15.8 ppg Class G
12.25
9.625
47
Pilo
Hyd 563
17389
38
38
17427
7125
Tail: 132 bbls, 15.8 ppg Class G
TOC: 15,927' MD / 6,800' TVD
8.5 1 4.5 1 15.2 1 P110 I Hyd 563 1 6500 1 17227 1 7118 1 23727 1 6998 1 Slotted Liner -No Cement; 200' lap
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured):
Casing Length Size Cement Volume MD TVD
Conductor/Structural
Surface
Intermediate
Production
Liner
Perforation Depth MD (ft): N/A Perforation Depth TVD (ft): N/A
Hydraulic Fracture planned? Yes ❑ No ❑✓ .
20. Attachments: Property Plat O BOP Sketch ✓ Drilling Program Time v. Depth Plot Shallow Hazard Analysis
✓
Diverter Sketch ✓ Seabed Report Drilling Fluid Program ✓ 20 AAC 25.050 requirements `
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be
deviated from without prior written approval. Contact Name: Thomas McKay
Authorized Name: Larry Burgess Contact Email: tom.mckay(a)bluecrestenergy.com
Authorized Title: Alaska Manager Contact Phone: 907-754-9566
Authorized Signature: / Date:
6-11 Commission Use Only
Permit to Drill API Number: / , '/ Permit Approval See cover letter for other
Number: 2 / 17- a � 150-.7__ S f GL� �rlJ � �(j � �' Date: � 5 � requirements.
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales:
Other: Q� Samples req'd: Yes ❑ No Mud log req'd: Yes _
O ins ❑ d
HzS measures: Yes No Directional svy req' es o
Spacing exception req'd: Yes F✓]rNo ❑ Inclination -only svy req'd: Yes o
Post initial injection MIT req'd: Yes Flo n
APPROVED BY 3 /Y G
Approved by: COMMISSIONER THE COMMISSION Date: I
V\ Submit Form and
�l ,'Form 10-401 Revised 5/2017 This permit is valid for 24 nRhftkj.1d t f I per 20 AAC 25.00 (g) Attachment in Duplicate
IuNest
Energy
3301 C Street, Suite 202, Anchorage, AK 99503
Thomas W. McKay, P.E.
Phone: (907) 754-9566
Email: tom.mckay@bluecrestenergy.com
February 11, 2019
Alaska Oil and Gas Conservation Commission
333 West 7tn Avenue, Suite 100
Anchorage, Alaska 99501
Cosmopolitan Project
RE: Application for Permit to Drill: Horizontal Production Well H13-L06
Fishbone Producer Lateral H13-11-06
Form 10-401; Fishbone Multilateral Well Design
Dear Commissioners,
BlueCrest Alaska Operating LLC hereby applies for a Permit to Drill for the onshore horizontal
production well H13-L06 — Fishbone Lateral Producer. This well will be drilled and completed using
BlueCrest Rig #1. The planned spud date could be as early as 10 March 2019. H13 will be a
multilateral producer, employing seven (7) "fishbone" style ribs drilled off the mainbore up into the full
section of reservoir present on this Lease. The 1-113-1-06 well will be an open hole sidetrack off the
H13 mainbore, to be drilled from the H13 slot.
The H13 Fishbone Producer well will not be fracture stimulated but instead will rely on the seven (7)
rib wellbores to drain the hydrocarbon fluids, etc. into the main bore which will be cased with a 4-1/2"
slotted liner. The well will be completed with 3-1/2" tubing and lifted using gas lift as needed. A
Diverter Waiver is also requested for well H13 mainbore, for which the justification for the Waiver can
be provided on request.
Please find attached for the review of the Commission form 10-401, and the information required by
20 ACC 25.005 for this well. Please note that the eight (8) Spacing Exceptions for this 1-113 well have
already been submitted to the AOGCC. Also note that seven (7) additional yet abbreviated APD
packages will be submitted for each well "rib" numbered L01 through L07, which are proposed to be
open hole sidetracks off the mainbore. As per AOGCC regulations, each rib requires its own unique
name and APD.
If you have any questions or require further information, please do not hesitate to contact Tom McKay
at 907-754-9566 (office) or 907-350-9544 (cell).
Sincerely,
4r-w-� /0 441��
Larry Burgess
Alaska Manager
BlueCrest Alaska Operating LLC
H13 Fishbone Multilateral
Application for Permit to Drill
Package
H13 — L06
H13
BlueCrest H13 Fishbone APD Package - Main Bore + Fishbone Lower Laterals
Section
Topic
A
Cover Letter
B
APD Table of Contents
C
Form 10-401
1
Well Name
2
Location Summary
3
BOPE Information
4-a
Drilling Hazards Information
4-b
Pressure Model Plot
4-c
Drilling Hazards Summary
5
LOT/FIT Procedure
6
Casing & Cementing Program
7
Diverter System Information
8
Drilling Fluid Program
9
Abnormally Pressured Formation Information
10
Seismic Analysis
11
Seabed Condition Analysis
12
Evidence of Bonding
13
Proposed Drilling Program
14
Discussion of Mud & Cuttings Disposal and Annular Disposal
15
Attachments
15-1
Drilling Procedure - Proposed Drilling Program
15-1a
Wellbore Schematic - Cross Sectional Color View
15-1b
Wellbore Schematic - Excel Section Review
15-1c
Wellbore Schematic - Visio Version
15-2
Directional Plan
15-3
Casing Design & Cement Volume Calculations
15-4
Formation Integrity & LOT Procedures
15-5
BOP & Choke Manifold Configuration
15-6
Wellhead & Tree Configuration
15-7
Diverter Configuration & Schematics
15-8
H13 Lease Map
15-9
H13 As -Staked Surface Slot Location
15-10 1
H13 New Well Rig Elevation Form - to be provided when rig is on well
2
2
2E
2
2
2
2
2
2
2
2
c
G
cc
G
/n
2
V)
V)
V)
V)
V)
V)
V)
V)
V)
Ln
In
Ln
Ln
�:
2
U-)
3�
3:
?:
3
�:
�:
3
?:
3
�:
�I
Ln
V)
Ln
Lr)
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
r-I
rl
ri
ri
1-1
_q
-4
1--1
-1
f-i
-1
Ln
ri
N
w
w
KU:
cr
K
w
K
�
cN--I
V)
V)
V)
V1
Vl
L/
V)
Ln
V)
V)
of
l/'I
cc
L/
Ln
M
of
M
M
M
M
M
M
M
m
M
M
H
,
F-
mF-
m
00
00
00
00
00
00
00
00
00
00
00
N
r,
(V
F-
W
N
N
N
N
fV
N
N
rV
N
N
N
O
N
u
LJ
U
U
U
L;
6
U
V
U
N
V
Na)
ki
N
N
0)
N
U)
N
0)
N
(1)(1)(1)N
N
V)
V)
V)
V)
V)
V)
V)
n
L)
V
V)
V)
NV)
V)
U
aj
J
J
J
N
U1
J
J
J
J
J
J
J
J
J
J
N
J
Ln
W
LL
W
LL
W
LL
V)
W
W
LL
W
LL
W
LL
W
LL
W
LL
W
LI.
W
LL
W
LL
W
LL
W
LL
W
W
LL
LJ
V
I
ci
_I
W
LL
lD
0)
O
lD
M
V
i�
LL
LL
D
LL
M
N
N
rq fV
00
r,
h
V
V)
N
N N
O
Ql
LLr
I,
O
M
'Cl
O
'zl
ri
N
Ln
M
.--I
ri
N
-1
N
N
M
M
-Zt
M
r-
V
.-
J
J
J
M
-
J
J
J
J
J
J
J
-
J
J
�t
J
Ln
V)
V)
V)
V)
V)
to
V)
V)
V)
V)
Ln
V)
cn
V)
V)
LL
LL
LL
N
LL
LL
LL
LL
LL
LL
LL
LL
LL
LL
ll
Ln
LL
N
r�
LL
m
M
O
M
lfl
c-i
O
L7)
00
LL
00
LL
@
00
V
00
Ch
N
N
''r
Tr
n
c-1
Q)
N
M
c-i
N
.
O
LO
_
M
O
_
W
Ln
m
Q)
I-
M
'-1
n
N
ry
J
N
V
N
I�
N
M
M
m
M
M
V
Ln
V
c-I
Ln
V
1
Ln
O0
m
r,
n
lD
m
m
ID
Ln
M
M
00
m
m
a
o
ri
ci
r
o
0
0
rn
o
r`
m
m
a
r-i
lD
00
rn
I"
00
m
m
00
1-1
Ln
00
fV
Ln
O
rn
m
r-
lD
O
lD
O)
Ln
lD
-Zt
Ln
M
M
N
r,
.--i
O
1-1
Ln
00
lD
m
00
m
.-1
N
00
lD
N
O
lD
m
O
I"
m
ci
lD
d'
00
O
00
O
00
Tt
O0
00
00
Ln
00
Ln
00
Ln
00
lD
00
LD
O0
to
00
lD
00
I -I
O0
lD
00
n
00
n
00
n
00
n
00
n
00
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
C
O
J
I�
to
c-I
I-
m
m
00
m
N
ci
V
M
NM
m
m
m
0)
00
CD
LD
0)
N
Ct
lD
CDfJ
lD
M
CDrV
m
00
I�
M
m
r,
N
w
r,
M
N
m
lD
V
Ln
M
CD
O
V
0)
O
N
I1-
M
00
0)
O
00
r"
Ln
M
m
00
N
V
00
N
0
lD
C
rl
Ln
Cf
Ln
00
m
LD
r,
co
0
1--1ci
rl
ci
M
0
Ln
00
w
m
h
I-
00
00
m
H
O
M
O)
Tt
m
Ln
Cf
lD
Ln
lD
V)
ww
0)
O0
01
00
0)
0)
0)
00
m
O)
m
0)
m
m
0)
W
fb
00
00
a)
Ln
00
00
00
00
01
00
Lb
00
00
00
00
00
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Y
J
M
00
Q
a
Z
K
Ln
r,
H
O
m
o
Ln
O
-1
0
r1
0
M
o
N
o
0
0
c-I
N
Cl
O
W
O
r-
O
N
O
n
O
lD
O
W
M
H
m
m
n
n
lD
lD
Ln
M
O
M
00
lD
Ln
to
M
r"
m
O
N
O)
It
m
LD
Ln
N
lD
tD
0)
O
00
Ln
N
O
-1
h
lD
Ln
m
Q)
lD
M
.-I
O0
lD
N
O
r-,
lzz
`--1
00
lD
c-I
V
l0
Ln
0)
V)
lD
lD
Il
LO
n
n
00
n
00
00
00
00
Ol
}
v
v
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
r-I
c-1
rl _
c-I
.-i
a-i
.--1
r-1
.--1
�--1
<-1
c-I
N
N
N
N
N
N
N
_
N
_
N
N
N
N
N
N
.
N
N
N
N
n
N
Q
a
zr,
00
O)
O
lD
0
m
CD
m
CD
O
O
r-
O
O
O
O
a
O)
ci
o
v
o
m
o
Ln
o
lD
o
r-
o
Ln
o
lD
o
Ln
O
N
m
I,
Ln
Ln
Ln
Ln
M
00
I,
Ln
M
N
O
m
00
V
M
Ln
Ln
M
N
m
Ln
O
rl
o0
L.O
00
O
.--I
O)
O
V
lD
.--I
Ln
I�
11
V)
m
O
V
c l
M
c}
V
of
lD
I�
O
O
X
00
n
O
V
m
00
Ol
r"
00
r,
n
LO
I-
V)
LD
Ln
V)
Ln
lD
LD
lD
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
rl
ci
c-I
r-1
c-i
c-I
rl
r-I
a -I
rl
r-I
ri
c-1
r-1
1-4
`-1
-4
O
rl
n
N
V
I,
r-
r,
o0
r,
00
I,
00
I-
rl
rl
co
r,o
w
M
N
lD
-!
I-
ei
lD
-i
lD
1-
LD
e-I
1p
-i
O
rl
r
00
M
O
M
O
N
O
M
O
M
O
M
O
M
o
Q
N
LD
m
N
m
N
m
N
00
N
0)
N
T
N
M
N
lD
>
Ln
O
O)
rl
'LiI-i
lD
Ii
Lr
I-
Ln
-1
lD
c-i
ri
00
F-
M
r"
LO
n
lD
n
lD
n
lD
r
LD
(h
l0
r,
lD
r-
lD
G
O
O
N
O
O
O
M
O
m
O
.--I
o
0
O
r,
O
O
00
O
O
LD
O
W
O
00
CD.-i
O
V
O
Ln
O
r,
O
co
O
r-O
o0
O
r-
CD
Ln
O
m
O
'1"
O
r-I
O
M
p
m
r,
N
Ln
lD
O
O
N
N
O
O
O
00
O
rl
0
lD
C
r,
00
r ,
Ln
00
m
00
c-I
O)
Ln
r"
.--I
Ln
r-
M
N
C
lD
M
I,
00
00
O)
O)
O
O)
O
(N
c-I
N
N
M
N
N
N
N
N
N
N
U
D
U
V
O
O
o
O
D
O
D
O
o
O
D
O
D
O
D
V)
In
—
F-
Y
F-
Y
F-
Y
F-
Y
H
Y
O
O
O
O
O
O
O
J
J
J
J
J
J
J
M
M
M
M
M
M
M
M
S
S
2
S
2
2
2
2
IlueNest
Energy
Application for Permit to Drill Document
Cosmopolitan Project
H13 10-401 L06 APD Discussion Sections
Horizontal Multilateral Producer H13-L06 — Fishbone Lateral
Table of Contents
1. Well Name...................................................................................................................3
Requirementsof 20 AAC 25.005(f).............................................................................................................. 3
2. Location Summary........................................................................................................3
Requirements of 20 AAC 25.005(c)(2).......................................................................................................... 3
Requirementsof 20 AAC 25.050(b).............................................................................................................. 3
3. Blowout Prevention Equipment Information..................................................................4
Requirements of 20 AAC 25.005(c)(3).......................................................................................................... 4
4. Drilling Hazards Information.........................................................................................4
Requirements of 20 AAC 25.005 (c)(4)......................................................................................................... 4
DrillingHazards Summary: ..................................................................................................................... 6
5. Procedure for Conducting Formation Integrity Tests.......................................................7
Requirements of 20 AAC 25.005 (c)(5)......................................................................................................... 7
6. Casing and Cementing Program.....................................................................................7
Requirements of 20 AAC 25.005(c)(6).......................................................................................................... 7
7. Diverter System Information.........................................................................................7
Requirements of 20 AAC 25.005(c)(7).......................................................................................................... 7
8. Drilling Fluid Program...................................................................................................8
Requirements of 20 AAC 25.005(c)(8).......................................................................................................... 8
9. Abnormally Pressured Formation Information................................................................8
Requirements of 20 AAC 25.005 (c)(9)......................................................................................................... 8
10. Seismic Analysis...........................................................................................................8
Requirements of 20 AAC 25.005 (c)(1O)....................................................................................................... 8
11. Seabed Condition Analysis............................................................................................8
Requirements of 20 AAC 25.005 (c)(11)....................................................................................................... 8
12. Evidence of Bonding.....................................................................................................9
Requirements of 20 AAC 25.005 (c)(12)....................................................................................................... 9
13. Proposed Drilling Program............................................................................................9
Requirements of 20 AAC 25.005 (c)(13)....................................................................................................... 9
11Page
H13 10-401 L06 APD Discussion Sections
ZuNest
Energy
Cosmopolitan Project
H13 10-401 L06 APD Discussion Sections
14. Discussion of Mud and Cuttings Disposal and Annular Disposal.......................................9
Requirements of 20 AAC 25.005 (c)(14)....................................................................................................... 9
15. Attachments................................................................................................................9
Attachment1 Drilling Procedure................................................................................................................. 9
Attachment2 Directional Plan.................................................................................................................... 9
Attachment 3 Casing Design Calculations.................................................................................................... 9
Attachment 4 Formation Integrity And Leak Off Test Procedure..................................................................... 9
Attachment 5 BOP & Choke Manifold Configuration..................................................................................... 9
Attachment 6 Wellhead & Tree Configuration.............................................................................................. 9
Attachment 7 Diverter Schematics.............................................................................................................. 9
Attachment8 Lease Map....................................................................................................................................... 9
Attachment9 As -Built Slot Survey.......................................................................................................................... 9
Attachment 10 New Well Elevation Form.............................................................................................................. 9
21Page
H13 10-401 LO6 APD Discussion Sections
lueNest
Energy
Cosmopolitan Project
H13 10-401 L06 APD Discussion Sections
1. Well Name
Requirements of 20 AAC 25.005 (f)
Each well must be identified by a unique name designated by the operator and a unique API number assigned by the commission under 20AAC
25.040(b). For a well with multiple well branches, each branch must similarly be identified by a unique name and API number by adding a suffix to the
name designated for the well by the operator and to the number assigned to the well by the commission.
Well Name: H13-11-06
To include the L06 Fishbone lower lateral drilling and completion only.
NOTE: This well will be proposed as a "fishbone" design with a mainbore named as H13, and seven (7) open hole
"barefoot" laterals drilled by open hole sidetrack from the mainbore to be named as: H13-1-01, H13-1-02, H13-1-03, H13-
L04, H13-1-05, H13-1-06, and H13-1-07. The seven (7) laterals or "ribs" will be drilled upward into all the Hemlock and
Starichkof reservoir layers at an inclination of approx. 115 degrees, and each will have its own APD package to be
submitted. This particular package (1-113-1-06) is for the fishbone lateral 1-113-1-06 drilling and completion operations. `
2. Location Summary
Requirements of 20 AAC 25.005(c)(2)
An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and
identified in the application:
(2) a plat identifying the property and the property's owners and showing
(A)the coordinates of the proposed location of the well at the surface, at the top of each objective formation, and at total depth, referenced
to governmental section lines.
(8) the coordinates of the proposed location of the well at the surface, referenced to the state plane coordinate system for this state as
maintained by the National Geodetic Survey in the National Oceanic and Atmospheric Administration;
(C) the proposed depth of the well at the top of each objective formation and at total depth;
(D) other information required by 20 AAC 25.050(b);
Location at Surface — H13
2344' FSL, 1524' FEL, Sec. 2, T4S, R15W SM -
ASP Zone 4 NAD 27 Coordinates
Northing: 2,144,793.15' Easting: 168,845.47'
RKB Elevation
180.65' AMSL
Pad Elevation
146.2'AMSL
Location at Top of Productive Interval — H13-1-06
4798' FSL, 3729' FEL, Sec. 28, T3S, R15W SM
ASP Zone 4 NAD 27 Coordinates
Northing: 2,158,155.82' Easting: 156,432.50'
Measured Depth, RKB:
21,500'
Total Vertical Depth, RKB:
7,124'
Total Vertical Depth, SS:
6,943'
Location at Total Depth — H13-11-06
158' FSL, 4740' FEL, Sec. 21, T3S, R15W SM -
ASP Zone 4 NAD 27 Coordinates
Northing: 2,158,826.00' Easting: 155,440.00'
Measured Depth, RKB:
22,772'
Total Vertical Depth, RKB:
6,730'
Total Vertical Depth, SS:
6,549'
Requirements of 20 AAC 25.050(b)
If a well is to be intentionally deviated, the application for a Permit to Drill (Form 10 401) must
(1) include a plat drawn to a suitable scale, showing the path of the proposed wellbore, including all adjacent wellbores within 200 feet of any
portion of the proposed well;
Please see Attachment 2: Directional Plan
Please see Attachments 7-8: Diverter Schematics / Lease Map
(2) for all wells within 200 feet of the proposed wellbore
(A) list the names of the operators of those wells, to the extent that those names are known or discoverable in public records, and show that
each named operator has been furnished a copy of the application by certified mail, or
(8) state that the applicant is the only affected owner.
The Applicant is the only affected owner.
3 1 P a g e
H13 10-401 L06 APD Discussion Sections
llueNest
Energy
Cosmopolitan Project
H13 10-401 L06 APD Discussion Sections
3. Blowout Prevention Equipment Information
Requirements of 20 AAC 25.005(c)(3)
An application for a Permit to Drill must be accompanied by each of the following items, except for on item already on file with the commission and
identified in the application:
(3) a diagram and description of the blowout prevention equipment (BOPS) as required by 20 AAC 25,035, 20 AAC 25.036, or 20 AAC 25.037, as
applicable;
Please see Attachment 5: BOP & Choke Manifold Configuration
4. Drilling Hazards Information
Requirements of 20 AAC 25.005 (c)(4)
An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and
identified in the application:
(4) information on drilling hazards, including
(A) the maximum downhole pressure that may be encountered, criteria used to determine it, and maximum potential surface pressure based
on a methane gradient
The expected reservoir pressure in the Starichkof / Hemlock Sands is —0.472 psi/ft, or 9.07 ppg EMW at 6,951' TVDss
taken per MDT's on Cosmopolitan 1. The maximum known pressure in the upper Kenai sands is 9.66 ppg @ 3,841' TVDss
per MDT's taken on Cosmopolitan 1. To be conservative, the highest pressure gradient of 9.66 ppg or 0.502 psi/ft will be
used to determine MPSP at the production interval of 6,900' TVDss.
The maximum potential surface pressure (MPSP) based on the above maximum pressure gradient, a methane gradient
(0.10), and the planned vertical depth of the Starichkof / Hemlock formation is:
MPSP=(6,900TVDss) (0.502 - 0.1 psi/ft)
=2,774 psi
MPSP=(7,070TVD) (0.502 — 0.1 psi/ft)
=2,842 psi (using TVD instead of TVDss for this calculation)
MAX BHP=(7,070TVD) (0.502 psi/ft)
=3,549 psi (using TVD instead of TVDss for this calculation)
(B) data on potential gas zones;
The Sterling, Beluga and Tyonek sands within the Kenai group have been known to contain gas. The intermediate section
will be drilled with a minimum mud weight of 10.5 ppg, the maximum known pressure through these sections is 9.66 ppg
@ 3,841' TVDss per MDT's taken on Cosmopolitan 1.
(C) data concerning potential causes of hole problems such as abnormally geo-pressured strata, lost circulation zones, and zones that have a
propensity for differential sticking;
Please see the Drilling Hazards Overview below.
4 1 P a g e
H13 10-401 L06 APD Discussion Sections
/ue es[
Energy
[ISIAR
,,1
r.. 4000
N
N
L
d 5000
$J 1
Cosmopolitan Project
H13 10-401 L06 APD Discussion Sections
Pressure Model (EMW)
UpperTyonek, 3292.44
Lower Tyonek, 6059.01
5tarichko#, 6874.84
Hemlock, 6902.77
8 9 10 11 12 13 14 15 16 17 18 19 20
EMW (PPG)
-Lithostatic Stress + MDT Data Frac Gradient Moving Average -Planned Mud Weight
5 1 P a g e
H13 10-401 L06 APD Discussion Sections
llueNest
Energy
Drilling Hazards Summary:
17-%" Hole Section / 13-%" Casing
Cosmopolitan Project
H13_10-401_L06_APD Discussion Sections
Event
Risk Level
Mitigation Strategy
Clay Balling
Maintain planned mud parameters, Increase mud weight, use
weighted sweeps, reduce fluid viscosity, control ROP.
Abnormal Pressure in
Surface Formations
Low
Diverter drills, increased mud weight.
Directional Control
BHA design, on -sight geologic review, avoid "drilling the line".
Lost Circulation
Low
Reduced pump rates, mud rheology, lost circulation material, use
of low density cement slurries, control running speeds.
12-W Hole Section / 9-%" Casing
Event
Risk Level
Mitigation Strategy
Reduced pump rates, reduced trip speeds, real time equivalent
Lost Circulation
Low
circulating density (ECD) monitoring, mud rheology, Pre -planned
LCM pills, lost circulation material.
Hole swabbing on
Reduced trip speeds, mud properties, proper hole filling, real time
trips
Low
equivalent circulating density (ECD) monitoring, weighted sweeps.
Sloughing Coals,
Increased mud density and fluid composition according to plan,
Tight Hole
controlled trip speeds, ECD monitoring, optimized hydraulics for
hole cleaning.
Abnormal Reservoir
Low
Well control drills, increased mud weight.
Pressure
Hydrogen Sulfide Gas
Low
H2S drills, detection systems, alarms, standard well control
practices, mud scavengers.
8-%" Hole Section / 4-%" Slotted Liner
Event
Risk Level
Mitigation Strategy
Fluid density according to plan, reduced pump rates, reduced trip
Lost Circulation
Low
speeds, real time equivalent circulating density (ECD) monitoring,
mud rheology, lost circulation material.
Hole swabbing on
Reduced trip speeds, mud properties, proper hole filling, real time
trips
Low
equivalent circulating density (ECD) monitoring, weighted sweeps.
Directional Control
Low
BHA design, on -sight geologic review.
Abnormal Reservoir
Low
Well control drills, increased mud weight.
Pressure
Hydrogen Sulfide Gas
Low
HzS drills, detection systems, alarms, standard well control
practices, mud scavengers.
6 1 P a g e
H13 10-401 L06 APD Discussion Sections
ZuNest
Energy
Cosmopolitan Project
H13 10-401 L06 APD Discussion Sections
5. Procedure for Conducting Formation Integrity Tests (only applies to H13 mainbore)
Requirements of 20 AAC 25.005 (c)(5)
An application for a Permit to Drill must be accompanied by each of the following items, except for on item already on file with the commission and
identified in the application:
(5) a description of the procedure for conducting formation integrity tests, as required under 20 AAC 25.030(f);
Please see Attachment 4: Formation Integrity and Leak Off Test Procedure
6. Casing and Cementing Program (only applies to H13 mainbore)
Requirements of 20 AAC 25.005(c)(6)
An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and
identified in the application:
(6) a complete proposed casing and cementing program as required by 20 AAC 25.030, and a description of any slotted liner, pre -perforated liner,
or screen to be installed;
Casing and Cementing Program
See also Attachment 4: Cement Volume Calculation Summary
CsgTop
OD (in)
OD grog
Hole
Weight
(Ib/ft)
Grade
Conn
length
(ft)
MD/TVD
BtM
MD/ND
Cement Program
(in)
(ft)
(ft)
20"
N/A
.5001
A525
Weld
152'
41'/41'
193'/ 193'
N/A
Wal
718 TOTAL BBLS
13-3/8'
17-1/2"
72
L-80
BTC
4,759'
40'/40'
4 ,799'/
LEAD: 564 bbls 13.00 ppg Kenai "A"
3,528'
Lead
TAIL: 154 bbls 15.8 ppg Class "G"
9-5/8"
12-1/4"
47
P-110
Hydri1563
17,389'
38'/38'
17,427'/
132 TOTAL BBLS
"G"
7,125'
TAIL: 132 bbls 15.8 ppg Class
TOC: 15,927' MD/ 6,800' TVD
No cement required
4 1/2"
8 1/2"
15.2
P-110
Hydril 563
6,500'
1 7,227'/
23,727'/
Slotted liner completion7
118'
6,998'
200' liner lap
Please see Attachment 3: Casing Design Calculations
NOTE: Due to the high inclination at the 9-5/8" intermediate shoe, a tractor would be required to run a CBL/USIT log on
this shoe. In addition, since the H13 well is not to be hydraulically fracture stimulated, it is requested that the AOGCC
waive the CBL /USIT requirement on the 9-5/8" cement job on the H13 well.
7. Diverter System Information (only applies to H13 mainbore)
Requirements of 20 AAC 25.005(c)(7)
An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and
identified in the application:
(7) a diagram and description of the diverter system as required by 20 AAC 25.035, unless this requirement is waived by the commission under 20
AAC 25.035(h)(2);
Please see Attachment 5: BOP and Choke Manifold Configuration. NOTE: BlueCrest requests a waiver to the requirement
for a diverter system while drilling the H13 surface section, just as was approved for wells H12 and H04. A justification
package for this waiver can be provided by BlueCrest to the AOGCC on request.
71Page
H13 10-401 L06 APD Discussion Sections
ZuNest
Energy
Cosmopolitan Project
H13 10-401 L06 APD Discussion Sections
8. Drilling Fluid Program
Requirements of 20 AAC 25.005(c)(8)
An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and
identified in the application:
(8) a drilling fluid program, including a diagram and description of the drilling fluid system, as required by 20 AAC 25.033;
Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. Drilling will be done
with drilling fluids having the following properties over the listed intervals in the following Table. NOTE: the base case
drilling fluid program is to drill the surface section with a fresh water conventional barite based system. The intermediate
section will be drilled with a oil based conventional barite mud system. However, based on the results seen in the H14,
H12, and H16A flowback production test histories, it is planned to drill the H13 production section using a solids free oil
based mud system with no barite, using only salt and calcium carbonate for weighting and bridging material, in order to
minimize near wellbore formation damage in the reservoir section. Since the well design does not allow for any type of
well stimulation or acid clean up after completion, it is vital for well productivity to drill the reservoir with as light a mud
weight as possible, and with as few solids as possible, in an effort to minimize formation damage.
Parameter
Surface
Intermediate
Production
Type
WBM
OBM
OBM
Name
Spud Mud
Versa Pro
VersaPro
Density (ppg)
9.8
10.5
8.8-9.7
Oil:Water Ratio
N/A
80:20
75:25
6/3 RPM
17-20
12-14
8-10
PV (lbs/100ftz)
<28
<28
API Fluid Loss (cc/30min)
NC
HTHP Fluid Loss (cc/30min)
<5.0
<5.0
Electric Stability (mlVolts)
>600
>600
pH
8.5-9.5
Chlorides
<2,000
9. Abnormally Pressured Formation Information
Requirements of 20 AAC 25.005 (c)(9)
An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and
identified in the application:
(9) for an exploratory or stratigraphic test well, a tabulation setting out the depths of predicted abnormally geo-pressured strata as required by 20
AAC 25.033(f);
Not applicable: Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
Requirements of 20 AAC 25.005 (c)(10)
An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and
identified in the application:
(10) for an exploratory or stratigraphic test well, a seismic refraction or reflection analysis as required by 20 AAC 25.061(a);
Not applicable: Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
Requirements of 20 AAC 25.005 (c)(11)
An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and
identified in the application:
(11) for a well drilled from an offshore platform, mobile bottom -founded structure, jack -up rig, or floating drilling vessel, an analysis of seabed
conditions as required by 20 AAC 25.061(b);
Not applicable: Application is not for an offshore well.
8 1 P a g e
H13 10-401 L06 APD Discussion Sections
lueNest
Energy
Cosmopolitan Project
H13.10-401_L06_APD Discussion Sections
12. Evidence of Bonding
Requirements of 20 AAC 25.005 (c)(12)
An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and
identified in the application:
(12) evidence showing that the requirements of 20 AAC 25.025 (Bonding)hove been met;
Evidence of bonding for BlueCrest Alaska Operating LLC is on file with the Commission.
13. Proposed Drilling Program
Requirements of 20 AAC 25.005 (c)(13)
A copy of the proposed drilling program; the drilling program must indicate if a well is proposed for hydraulic fracturing as defined in 20 AAC 25.283(m);
to seek approval to perform hydraulic fracturing, a person must make a separate request by submitting an Application for Sundry Approvals (Form 10-
403) with the information required under 20 AAC 25.280 and 20 AAC 25.283; (13) a copy of the proposed drilling program;
Please refer to Attachment 1 — Drilling and Completion Procedure for Barefoot Fishbone Lateral
Note: The H13 well will NOT be hydraulically stimulated.
14. Discussion of Mud and Cuttings Disposal and Annular Disposal
Requirements of 20 AAC 25.005 (c)(14)
An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and
identified in the application:
(14) a general description of how the operator plans to dispose of drilling mud and cuttings and a statement of whether the operator intends to
request authorization under 20 AAC 25.080 for an annular disposal operation in the well.;
Solid and liquid wastes generated during the drilling process will be disposed of at Hilcorp Alaska, LLC's Kenai Gas Field
(KFG) Grind & Injection (G&I) Facility or AIMM Technologies' (hydrokinetics) facility in Kenai. Dried water base cuttings
from the surface section are planned to be properly disposed of in a local landfill after being tested using the filter paint
test. No annular disposal is planned for this well.
15. Attachments
Attachment 1 Drilling & Completion Procedures with Wellbore Schematics
Attachment 2 Directional Plan
Attachment 3 Casing Design and Cement Volume Calculations
Attachment 4 Formation Integrity And Leak Off Test Procedure
Attachment 5 BOP & Choke Manifold Configuration
Attachment 6 Wellhead & Tree Configuration
Attachment 7 Diverter Schematics — N1, waiver requested
Attachment 8 Lease Map
Attachment 9 As Staked Slot Survey
Attachment 10 New Well Elevation Form — to be provided when rig moves onto well slot
91Page
H13 10-401 L06 APD Discussion Sections
llueNest
Energy
Attachment 1:
Cosmopolitan Project
H13_10-401_L06_Fishbone APD Attachments
H13 10-401 LO& Fishbone APD Attachments
BlueCrest H13 Horizontal Fishbone Lateral Producer
Drilling (7) Fishbone Barefoot Laterals (8-1/2" Production Section)
(NOTE: This one page Drilling Procedure is included in each of the APD Packages for Laterals
1-01-1.07, under Attachment 1, Drilling Procedure. NOTE: This Procedure does not involve
using MPD or displacement of any drilling fluid with LVT)
1. Make up 8-1/2" PDC bit on RSS BHA and RIH.
2. RIH with drilling BHA on 5" and 5-1/2" drill pipe (combination of XT-50 and XT-54 drill
pipe).
3. Circulate bottoms up at float collar.
4. Pressure test 9-5/8" casing to 3500 psi for 30 minutes; chart and report results.
5. Drill out float collar and shoe track.
6. Drill to TD; circulate and condition mud. Drill 20' of new hole.
7. Perform FIT to 13.0 ppg EMW; chart, graph with casing pressure test, and report results.
8. Review results with office staff and AOGCC staff; obtain AOGCC approval to drill ahead.
9. Establish parameters and drill ahead using an 8.8-9.2 ppg low solids, barite free MOBM
drilling fluid, as per directional plan to first sidetrack point for 1-113-1-01.
10. Directionally drill well to L01 target and drill L01 lateral to 1-01 TD as called by Geologists.
11. Circulate and backream the L01 lateral back to the main bore.
12. Initiate trenching and time drilling to execute an open hole sidetrack away from L01 and
to the kickoff point for the L02 lateral.
13. Directionally drill the L02 lateral using the same procedure as L01.
14. Repeat these steps for drilling laterals 2 through 8 in H13.
15. After drilling to well TD in Lateral 8, circulate hole clean.
16. Backream to 9-5/8" casing shoe.
17. Continue backreaming until inside the 9-5/8" casing above the shoe.
18. Spot high viscosity pill and cap well to surface with a 9.7 ppg low solids mud without
barite.
19. Backream / POOH as directed. Manage and lay down drill pipe as wear patterns require.
20. Pull out with the BHA.
21. Lay down same and report wear patterns to office on all BHA components.
22. NOTE: BHA and drill pipe wear, along with the 14-day AOGCC BOP test requirement, will
determine how many laterals can be drilled on each bit run.
23. An RTTS packer for 9-5/8" casing is available on standby in the event a BOP test is
conducted with the drill string hung off below the wellhead using the RTTS.
24. After well TD is reached, rig up to run 4-1/2" slotted liner lower completion as per
approved program.
aD
.�
L
To
i
�S
a
O
L.
0..
.Q
4NO
O
^
L
N
W
m
++
O
L
3
o
v
U6
O
++
J
E
O
V
m
00
5
N p�
n n
O
O
i
J ` C
O t
'CL
n C�
-W O
Ot
d0
•C
*+
.c O
C ea o
y w y
Tn
d C w
L
� C
O O
rL �
cc
4+ in
04
:0.co
d C C.
°°3eaddma
�: •a = Y
L O
i .` .� a
y
0
O 'O N
•=z•mmrc
E— Z
c
E J2 C a
t L L r
.w .0 Q
ii a
_ °' _ m
cc
Ul •�
n
s
0
.s
Ln
J
0
J
M
0
S
s
Q
cla ai
_
�
u
•G G
Oh
d
C
CL
d
iC
= H
L
C C
rn
J
rl N
a a
n
Q
M
Ln &n
of _
2
H
a
a
c
o
O
a`
o0 0c
O -0
0o
v a
a
to
N
v
ca Cl-
a00i -va
v
u,
W m bD
o a
M-
r, M
>
Co oo
O O
0)M
CD
°° a
`~ N
u o
\ a
u E
a
u
O r1
C
-O O
C •�
fl'
C •N
n
o
¢
o
a
ai
X
ro a
00
of
0
v
F
'm
~
o
-a
m
N N '� G1 V1
n
V1 N
+�+ C VI
C
J u ^ 4 u
fMi
li .O u
N J
aJ a
-0 X
Q 9 W w
9 X
u
v
as ooa
;° o
Qm
0 o
"
u
o a�
Ua
-1 O
o Z
O
(Yj N `ti �-1
C
N
O v
0
c
°
=
0
2
V
O
Y
0 u
0 '6
a V)
I
I
1
v
1
v
I
t
N
LO
I
g
1
0
t"
N
I
N U
I
c v
H o
¢
I
u
o\
I
v
a
LL
3
I
cotow
I
v o
v
I
o
00
m
C ro
u
O
M
U
c x
0 Ln
x
Ln
C
I
u
N
O O
I
M
r0
C:5
_
I
i\
\
I
N O
C a--1
to "O
Ln
2
00
3>
J d
= Y
1
-0 N
I
�
o _O
m
CL
I
ti0 v
N
w
N
I
=
it
00
v
Ln v
M C1
I
J pl
'~ E C
N N
I
\ U
G
� = C
4
4 _N
C
O
O
O
'O
N
\ C
\ C
N C
t` Q
N fl
a
O
O
00 O
O
ZZ
J
t
O'
N
y
O
^r
N
N
O
wcc
w
3
0
a
V
u �?
U C
O
O
~
O ti Z
a
>
O ' Z
U N v v Z
a 0
~
d O
a 0 a)0
r
3
N N
00
V U Vn
N
- -O u a-N
0)
o
x 3
n
v 3 u
v v c
u;
.�i Cl- a r0
ti X r° co
\
00 X F (J m
\
0
0
a
N
� Q
IN
r=.+
a)
^
V
n
cc
cc
cc
■
Lf
_
U
�r' ■
cc
Q
O
O
O
O
p
O
LO
O
8
LC
cc
LL
0
Y
Q
Lo
co
V
It
O
F
■
O
CC
Q
LL
Ln
O
Y
=
p
O
N
I�
O
U_
H
O
O
W
Y
=
O
Q
Lf)
cc
t�
Q
LL
Y_
t
V♦
o
M
O
LO
LO
_
o
LC.
H
L
c
N
O
O N
t�
N
O
N 7
O q) m
wm
a
��OF
O �a
Q
=
o
0
�
�\
o
T n
o
1
coo
fq U
o
2
nuest
Energy
Attachment
Cosmopolitan Project
H13 10-401 L06 Fishbone APD Attachments
H13 10-401 L06 Fishbone APD Attachments
P.
r-
O
C.
O
,d
V
WO
N1
O
Q
2
a
N
a
to
Q
J
M
2
a
m
- m
J J S
m o
m�2 S $
Q m m W
m B B E c N m
c$o W mmto� O 2ZOM2
25 a X $Ec7 $Q=
No ao' ovv'i famHo
1'
O
L 2
c m 2�
'J E a C y o a c �m L �
p 0 W C m LL m C m m=
m
C
O O m = LL ..
J9 ;9 2 2 6 0 O C O C C E'M E
O
pT W u K K? C C C C t V U U
>G 0 m m 0 m 0� - 0 ra i go
Z U' F J
3
w
m5$a
� o N
O 2 W6 N m
rn = v a Y o C
C LL N
N m�O j�'SjS� R N
Z. o o
E M N m n N o 0
�mtg ci 2xvmi2-m, �ZZZ� �N
.. E
o
� m m
G � C
W
C W ..
m O z ` O .. Ow22 j.+t
C LL aO.
� = 2 O C a Wd
y Yp jO U' 0.2
m 2 0 m o'
m LL N N YO- V J J U f7 ::
2
C N
a r O A N i O N 0 m N V 0 O m C 0 N N OI a N 0 m S C A N S Q O.
aOO a v 0 D V M
Ny N O
OO
NO Q
m�
W
mMA
��y p p� y� yN. B
p m �
E m m
m00 OV>Cth amD mS mmS OmD mSOmmD mm mm OmoO m m^mmNC'I �p�pp mS mm mM m�mO mN �mnO �tO'1 am fain^� ON mC^')O MNt00 N
m�O mmmmmmmmNlllm��� W S m m �^�m �
mm mmmm mmm�mmmm
t0-N---m----
--------- -- -
d
y� m �O
0ml0 m�Oy NCNI aS rOOtppO �Mt�pON OmmOOo mS' NO�pOp�OOm . m OONi. 1.ON
N
N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N O
N
F C
W ....
y m o p m
m �MQ h��O {m�pO pNN V 010. tOJ m1p�. m hOm �y�mm mS y�g��yno'�iv�2
(ACMNcli V tV
t�lmmmMNeNMmIhN'h N$M$�do')m S l^h C7C
�p^O C'i l�yhM m1 SOD V nm'ldm �
O
pS Amy
- m m- m N--- N- m- h---- O O
- N � y3h
SmQ�
Nth
tmme0
N�
MNy m �OO p[hM� �mmmSOnN---N-NyO-O� yWN
mt^Nh
I�N
Ca
O
A
m-Gm0��..
---0
....Ommmm
..........
V
c t
0 O
as
=m
u c
NN
C 0
$ S S S S N N M m o m N N N N ya
S000 N O. NN<NN0 Nm �O S W 0 0
0 C
hm HNb NbNNh
T
S
� Y
E
O
N
J
0 0
Q O O O O O O S S h h S S N N N N O 0 0 0 0 0 S$ S S S$$ S O O O S S S S S S S S$$ S$$$ S
0 0 0 N m m
Z COO °- �- � O O � � C G � � fV N M M M M ltl M a7 a7 M tD th M M th M IN M t7 M M th !h fy t7 t7 M C C C G C G
`
d
N
a
a as a . W 8888$,82rnt�i. n.-' man mQ ujm 222x222
N 6eN�' 'dmtcrr clo.6 6vie 6e
LO
N (6
a >
W
^
S O S S 2 a Nm � S
NS U.)^O^ . e
aO
OC9
CGCGV NNVVm a a n.M hoNg6$ m
m N V MS
CNN t7 G
�rr
th u1N CD O V Q i
to
CU
z ,,,,
O m y O m O S O S S S S S S S S O O m m N m l0 W N h N No N O N m O N m h N m m lo. N N S Q O S N E
O O O
600 C C C O O C C C C C C C C G � n'�
p OOyy mp C�
a S Q �
Oi
U ti
D
W
p m m y p
mO OOpO �S w
SSSONNOOOOOOOO N NNmoNoN �O Q�mrO� MO ��Y�OO � NNO R�NO
mOm
�OO
C CCCO Nq(OOth <00�0 m m ONC'-1 N �oNmn �' SN�Y� a�iOmo maS�NNeS'2 (Oran 0,
O
E
O
U
C
NA mm O .
SSSmpSnmSS1mS ^O"NSS1mm QmSOmm NN$S mS1 WOtmrE� aScmphn �OOi O S ONhNm N ya�Nm NP
OSS mY�OO Ome�J
hSSmQ SSS
NMaNn"
�NiJ
NNNN '
N N N N N M M N N M M M u th MMM e
Nam^
N„„
MMMO artO N a� N W m N <O1NNm SSb NS (O Nt�N <rn1(�t�(O Nh� Nbm COIN.
.rn O.
0m{My M�My
t.N
O m C4 m O m�O O
1 A N IN. N N N M d N m IN. 0 S O'y N N O pmp�� m^ t O OmO N 16,616
IQ. (NUJ m f° I o m f O OJ O n S m
�- NNNNNN NNNNNMMtM�IM�
2-
yN
S S 0 0 0 0 .... mm p
O O S SOO 00.Q.
h m N N M N S h CND N O b N S N N S a m m m ro m m m
SO
H
E
pS yN gOg yh
Dorn$®$$a$m®aa$m$aamNlntg,citMnc'icDtNnMMM�mmmcNJnrNi�nMmnNNNNNNNN
S S$ S Im. N S S S IOO $ S O h N 100 S N m n m m N O V t h M N Nm N O O
.9
S�OO
y� D
0 yyN�� m m
0 N 1 1 NI L O C O .- N th m d 0 m rn^ N N N M M (°1 V Q Q b S N h m m S n n r r r A n n
�K$$$$$$$$$$$S$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$
�..
�$p$$ $ $$8S
3888888
O
N N o Q m m S 8 8 8 S N 8 V h ®o ®S 8 0 to.V $S 8 8$$ S S 6 m
aa�O
N N N N N N N N N NIM MN MC'1N M e e a e
N
W
cli
U
$ $ O
$ O
E
Z I
I
K Z a W U U U W
U
W Q
M
m QrOb.-r Nmg NN �OMh�� m��(�mm�OmN� Om� N<n W N<IQ.ONNt� ONhm�t7N�Ot�666
O1n� N O m n O N m r � �C yy yyyyyy yy yy �n
W m�Imn ton V'tDMNN aoo �S"mnmmvoi w in �uNi m t�0000 �1�� � r V th NN� �ON0�mn0m O^t>mGaNNOO'� mO dMM00 m .-H
nm-mmmm--ttmmmm�mm88mmmmmmm$$m���^�a3r��'���i^'�'da3r85���������$� N.
m--mm--mmmmmmmm
W O Q N N Om N n N m M m Q O O y0y ymmtn�Q mmm toiOYm�lmnOlNnOmmhmmd�nONtOm NOyy 0�y0 m0 MmpN0 0N0 QM �y y�Vy� SOmmm0N1py�mN N mO W N N
01p'7 �gN y m Nn mr si0NN�ONNmN<� nm: bON bnONOm N � 0
m t 0 0 0 m ro O O N N I h Q m m 0 r m W Of O N t �1 t 7 cO m m 0 COD 0 O f O 0 0 p 0 0 0 0 0 0 0 0 0 0 0 0 0 0- n N
v m n n n r r n r c a a e v d d d d Q Q d d d d d d d d e Q Q Q Q m m m m m in m m m m m m m m m m m m m m m m m h m m m N m
d d .,• d d Q Q d d d d d d d e Q c v v v a a
N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N
r r r n m 8 N CD Q 0 0 N Nm < S h m n In 8 N V 9 M Om V S 8 N m V 8 S �, 8 ! 2 a a mN rn- M 0 N 0 m N S lO
nh a i c 8 N r 9 9 V 0 0 `r A; 2 S 8- v 8 N mO M O
mmm Qm mo mm Nmao pp yy ppi�nn ��nn
m . . C G
N N N 01 �I NI N N N 0 N 0 0 N 0 0 0 N m NNN 0 NO NN N NN N N N N N N N N N N N N N N N N
........ V V V V V V V ...
V V V V V V V V V V V V d d Q e Q Q Q d d d d d d e e d e Q Q d d< V O V V V V d d V d V V V d V V V V d V V V V V V V
mm mmm m mOOO)OO tD O o�OOOOOOp�O piOOp�p.000000000000000000000000000- - -. -.-- - - - - - - -.-- - -
0 Cth� CC�� �h th C�h� C�h� C�h� CNtDh N{N{yyNNNNNNNNN CNth�CN�h�NNNNNNNNCNNNNNNNNCN�CN�NNCNNN NNNNNNNNN
ro m m m m m m m 0 m m m m m m m m 0 m 0 0 m tO m m m m ro m m m m m m m m m m m m m m m m m tL1 m m m m 0 m 0 m m mmm 0 0 0 0 0 0 m m 0 m 222222 m m m m
M O p d O V N H N H H m m 0 m m mO N n n r m r W 0 m 0 CD m m m IR OCO N 0 0 W 0 N W N 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N
h totem mmmui. m.to........ N ham. Nto NHN m mmh to N. h NNoNhhm.... mmm. m. m 000 60 mm666 m tO mm. Dm.m m..m
SSS888SSSSSSSS88888SSSSS88888S8SSS88S8SS88SSSSS888S.SSSS88SSSSS88SSS8SSSS888885
d dpocdddddddddddddddddddddddddddddd6dd6dddddddti6ddodddddddddddddddddd6dddddddd d
d
2 2 2 2 2 2 2 2 2 2 2 2 S 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 S S S i 2 2 2 2 2 2 2 2 2 2 i i 2 2 2 2 2 2 2 2 i 2 2 2 2 2 2 i 2 N
a
x
N
yy mm mm yy ��nn C�h� pp mm mm pp pp aV a
y�y � mom O �000M p�pmh�yMt�n pO Or NN ON mN� �M NM tmOgi'NQ �m nm Cm�Om frO ^m dtS O`o" �pNOri ntVh dN8mh�dm�mrmmC D Vm �O �N OIMh Oi C0ONt0 v� oO]O mn hN OnON0m0� NN�.thm(OfnpO m�NimC1NY OOnGY 6NY 0NV6A Ogr "igO Nn rNQONO
M m N r N N�p mONyOtyDNh�nOm NOOQi
Ntn�hN77NN NN N NNNN. ah Y'Ir'lh I0n x� Ym1
a
yy�� ��nn tton ��nn tton ��nn y�n� Y�n� ��nn YY11 ��nn tton ��nn tton ��nn ��nn ��nn ��nn aa pp yy yy aa aa aa pp yy yy yy aa �h �h {{�h _�
m ^�N m<O(O NCOdO ci 00Nmd0f0 NCD V OtpN�OSlO NN m�QO N� <00 Na0 dOmN�<O mNCDQO mN0 d0 mNp00p0 mN0 V O�mn mNmQO n
pO th mCG ^6 V 6O M00�r Nmpp 1�CM��yy �mn �0n m�� mp0mp� th0 nOON�OC Nh_fmm� O�N�0�0nN00 yy� th �10� MOyy ���yy N(O Un�I+ NmONOmthOON E
C D ��yy pp n 0 A 8 W O t h l h Mmn (h 0 t h m M C] t h V Q Q Q M pm �pn m lO r Cm� O 0 N l h p' m m 0 t t'm 5 9 mpn M N N y y � � n (D
0 O N N N N N N N N N N N N N N M M M l0 Q Q< d d d d< e e m m m m m in m m 0-1 N m m m f0 0 m m m m t0 m m 662
0^ n r O
U
c
9 mm0 N n r ��mnn my� ro vri vMi V Q V t7 0 N N N m 0 0 0 W OO 0 m n N m N N h 0 0 th th pp N N O O N O� GD OD OA ��n p r m fD l0 t[mf h Q V pV tCmnJ CN'i N N N O y O O �O�h 0 lt OVy 0
90 m�Nth00mA O�pNp ObQ�pnOp ��rnnmrmOMNMm�'�nnm�000O�th<NtWn om0 �OMOp yO�m lm. mm O�O�NM V inmN W OOD NOrNO �pOn �mn fD d m000 O
N N N N N N N N N N N th i i M M M Cl lh M d d d d d d Q e Q Q m m m m in m m m m m m fO m m m m r n n n n n n r r n n m m m m m m m m m m Of o
E
fn
O
U
A nrrmm O nOMmm N V �OM00Nh m� QrOtOhm � m V n OMfD�NNCND� V N�NNm�drSO)ONNb NOC'1 fO�Nh m� <n Ot]mN�p� Otmhm OiN
pp9 �Nn O �mn �mn � O m m tV to to to th Cp �n �y CCyy y� tp�p
p ttOnn N ��t nnh �f� nn0 ��0nn m N m OmnD O n m Om tm h m m N N b Cm D 0 � 0�nn $ d n O t h m O N �C M�Cnn�� tm+ MmtyJ p V p rp C tctnnl t mtnn � W�nn m m mm m Q n O m CmO COD N m m 0 0 0 O n N N N N l h l h t h e pNN^m l0 4 D n n
i( J m m m m m m m ...
m p m d I O tmh f D 0 N 0N Nm O N B N N m V n y M m 0 N Y] m t0+] m N m O Q
O). n O t0h yb 0 �mn O ��n O t te mm W �Nn mN p'm pV m mO N N
D t+N�b��nnhm m Vym m�On �Mn �mn p0 tOp�Nh W N<mNN00m OOmO rNM NNtN� th' em�On tOhm ��nmromAi�r �yN NpN CJm W N u�61� V nONmOt N th C"j ilJ mYmJNh�
n (h o`�$Mn op. th c�, to to c�tmh tmh tmh to to on rot�'i th n`i MMto t�daQ e e ed V dee e � e � V <d V ed d eQ Q d V> V aC V voi CCm voi u�in v� vNi to uNi vNi v`hi mm
O m p mN m ro (p m 8 m m 0 m m m mmm 0 m 0 m m 0 ro m m m m m m 0 m m 0 m m m m m m m m m 0 m m m ro m m m 0 0 m ro m m 0 m m m m m ro m m ro m m m m m m m m m m
F O CC OI !Am t--—C —O ---ai
tD tF !D m!A tD tp Oi tS Oi Oi tD W O m tD mtF tD Oi O tS t5 n)m tL !D Qi tp fY tD tPO tL m!p tL tD tF tS ni t>!D nl t>O tS ni fL tD t5 fLO t>tD Oi Oi tL ni Oi !p !D
h i ti i i i i M M M M M M M i i i
p3 p8p m88 p88So8 o888885888888 ooS S o8 SS88�8 p8888 oS 88S88t8h 88n8 o8858888p8 8n t8p88p888t8y8 y8 8n fSp8SS 888E �8888SSSOp8 o88
>< R d d 8 N N N N 0 m 0 ro m 0 m 0 8 O ...........
OS 8 m CD W m m m S NN W Of Oi W ON O O 0 0 0 0 O O O O N CO] V N m0 m O N N
r nma' '^'.-'''''
O
N
d
O
N
l(i
CO
N
O7
U_
0
0)
C
0
f
C N
�y mm y pp mm NN y p pp
. .OrDN S� amS�e OrS N V n .NNn V mm a NQNO SSNe th �r NN S
msl NhN SmN GN00 Cl Ln . . )
Q m m aa
00 N Nnh N. . . . . . . N m(ONSO
('7
b C
O O pW O o S O O O O O M O i f: S
SSp N m O ama n N n 0 V 0 N n S r S n m O 1.91
2 1- 2 � � � O m l0 M N O O S S
m m m m m m
�m---mmmmmmmmmmmm-mmmmmmmmmmmm-m-m-BSS-Sm�mmm���
p
m m O a 0 0 S M O N M A S h 0 0 n N ro M t 9 m
m m m mp N N W 00 m 0 Of S
S S 0 0 0 m O Ol Ol O1 O1 S S m m
N
a
pp op o m y pC No
(ON^�1 tNNl S NmmM om OASnOSS
SnN
mNN
rNN MnN bON rONpO
S�N m$N
9hhmSN
m
C7
O
NyOyO
mNN'NNY1NptNO NadO y
NhV �NS
NNmNN mONy�NN
NON
NNNM
NNyyM
NN NrNm OmNO
mmmmmm�pmmhmb mmm
NO mN rNO�N mNmNN NON'NSbN N��N NV� ON NS�NN NN tNVh<N NV N NtmON MN nN NmN aNO NW
ma 88y
<t O S
N S m m m m m NIm m m m yyySZ
N n�V
b N Sm m m m m
N
cy)a�
^
—
Lf�q
Wy �mSm n Nm O m 0
C
mNrQ M Imnm S N m mNam SmoN0nmmoNnmmV
�NO)MN0I mA�tNOyyh cMM9M �pptN+�INSNN�Ny N�Ny m�y MmmI7mNNmd QOQ O <OOd V Nh YM�1NmmN2NNNV9r N-,-
aN aNaNaNaN
Nm m
1`OmOin
aa0aSySm
0y SSmy mmpa^pN'a
� O
MN
o
NppV Nyye Nyy��Oyy�
Nd m�
� me N � O
06000 NNmm NNOOr 000r 000mO�NNNNNNNN W Nm 00�� M �
p
QQQQeQaeQaeaaaeaeQQaQeaeeaaaaeaeeeeeQemmmmu�in
SNNNCo e �aCQoqQ ma Optt �Q
N0
h
�
inmmm Y11
N NNmmmmm N� hNm m NNNN.
C'
a pp pp
NN N N N N NNN N N N N N N N N N N NSNNNNNNN MSnmmMmNA MrnNr
nam
N mm
Npmm0
mam(LpONym
bymbGyO
N C
C
O
W
lmNNNNNNNNNN
h.o�mmm�y ymGyD
..M..2 mrom
..m..2..SSSSSSSSSS0SSS0mmyO0
yNm
�S phcO
pc0 aD mMmymOmy yNmGm
pCSM pOmpNtO
W
C C
0 0
ma
w j
X
• •
m
mmmmn nm O G400 NNMMe eeY. Y. Nm mNNSN �w, a as aea o e vC V hm NNNNNhNm m
NNNN. NN NNMMMMMMMM (��11 Mth
p p p m
l0 m m .mmm S mm mmm m go, OOO
p C
O�GmmmOfG fC tG tGmmmmmmro mmm mmOfG fG fG (G tG �C IG tGmm mmfGmmm mmmmmmm m. mlG tCmmm m
rG O fG 6 tG mm mmo tp'G mmm m mm mom
G u
C
O
O 0 0 0 0 0 0 0 0 S O 0 0 0 S S S S S h N b h N N N N h N S N h h h h S
G C G O C C O O G C G O O O O G G G C G C G C G G O G C C C C G C O G G G ....... -- .- O
S. N N S S SSSSSS S S S S 8 0 0 S S S
o M C J N CV f V lV C C 1 G C) O C t O t h t h N NNN O
a
N
a
t2
V.^_
NmmmNmmU/mNmmmmmmmNfANmNNNNmNNNfAmmmmmNJJJJJJJJJJJJJJ m N
IIIII I II I22 II I I I I I I I I I I I I I I 12 I I I I I I I M O n N N N m N V 2 2
JJ J J mJ m m N m N N O_' a: a: m NK O'NN
J 222222mmm J J mI2
N
�cc m of
d
2 y
N fp
W—
M OSNN On .N . . . .NmOa m mSS SN t. S m h NSrQNN and NS0 «O Xi r'neMNNN m
N0 n SS< Ntm+] ShS N S �ro�n
pp yy m p
N a V) N N N M m r S m N 0 S S; 1 n e N N 1 ID 1� 0 O e m 14 12 l` m m S 0 N^ W m yr N 1 W N M
�m� m n�rrn n�maowwmm �m$�mMw�am
y� o pp
m r N S V' N N N m m O N ro M O N ry CO,
as yma m°�m�a��o o ootoVbo
@
v
C—Nr
nO Om mO
Nm
NOnNNnNn
S3.��mo
+
N�m�
C_m
9A n 4 8 myy NmmN a NNmh
OA MrpQrmnrOmm�- mMmmm�`�mm
rm�Nm0mo ppOmoomNoeCCw''l) $��o,mm$arot 000000 -
NN X
88
O
nnm
o oo
'c
M
yVjj
OOO OO.yymmnnm mN NNO> aNVVO> SOmo
uk . .. N .. . .. .N
<mnS
NMnSm�mSS
nSmNSmmmfO
Sho °riomNmMa`' NN t+1 yym�
@
ynyOrtttt.-mNmO
l V^Hh�G
nN tMmm mmSaQ'mNmnmS mO�.-
n�pp�
aamNNSr�! mm'
m<
NOrN�httlNppO
N�
a N a♦maM miS
nRQhN-mS'M
-
N
O
U
c�
�—
o`a3 m�mci oNvmim�am'S'. maN�n m�MmayN vymi, 14Tt uui ��q qq . .n"oy3. . . .�. °fmo 0
Oi 0i00
00 o 0 n 0 1 `rwe�nonoa m a�a�w
OMmgN SOi
<nOt'�1 mNN VNf 0pyMy MO CJ mSNmSt�n� mSSm m W SmS0000000 ��
m .mmm
vmi umi umi vmi°'Oi�og�mmmmmmmmmmmdi o'�'�'�'����mmmmmmommmmmnnnrnnnnrnnn r
N' ' ' NNN^NNN N NNNN
r:n n nnrrnri nnn�n n � nnnr
y.
m
0 Qn$�. . . I .no�nmmrmi,virN�,o mm°jaiNv". . . . .cl!1 `. . . a
av a mmmNa.ma�M�n NvmnN
O
. .vn°rmN�vw'
m t Otpp O O �- .- � .- fV N fV t7 M t7 m V e e m S Y� S N N� r^ n r O th m S O m S S N Q n S N N N Oi
um..........
i m m m m m m m m m m m m m m m m m ro m m m m m gym' m� 2$�� `� ���� m m m m m� m
yy
• o
2—mmmmmmmmmmmmmmmm....
N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q m N n M m r Y> a eN O OQ O N S O
m m m m m m m mmmmm�ommmmamrmmmmaaemm
O S S S 0 0 N N N N N N N N t7 cm] M M O Q Q
Ny
Oi OI O)Oi Oi Oi Di Oi Oi Qi Oi Oi Oi Oi Oi Oi 0i 0i Oi Oi0 Oi OW Oi 0I mOi 0101 G40i 0i Oi Oi 0i 0i0 o>n�GhOwi fV OSOO—m m S M
M th thM MMMMMMt] MMt'+IM MIhM MMMMMM m M MMMt�+I t7M MMMIhMMMt7MMM m MM M M MM M M M (h
p o �y
Mm M t0+1 MthM MM pN 00000 O m NSStO]
I�MMMMM M
—
MMth MthM ]Mn MMMth th th MMMM(r�. t7N t. 11mmM MNM th th lhMS NCJ NO tpOrm Nth SS O
MAr
OO M c''] mmmmm rom Oh [NJ, nrn
yOy
nAn1� rrrA nlN.n AArr rnrn nrrnrnrn nA r rrrrnn nN^N�Sm mGOS00SSS S
SS N mI0 SSISmm0 S� N Sm m0S
O O O O O S S S S O O S O O S O S S S S S S O O O O O O O O O S O O S S m S S S O S O 0 0 0 S O 0 0 0 S 0 0 O
O S O O O O aD S S S O O O N S S S O O< O
O O O O S S S S S O O S S O O O O O S S S S O O O G C C O o 0 0 S O S S N S S O S S S 0 0 0 0 0 0 0 0 0 0 th O
o4iQmmrma,oM---------aa------$$------n-n
S S O O O N YmJ S S S S O M< S N S O O S
N N N
- - - nro mm--m�m$g�
m -----
N
r-
0 o
a a
W
N
U
g
E
g
o U
0
E
t
U `o> mm
N O S S O S
z z
aU a U
m
c
U
U W cA FU
H UW OF F U w
Q
a y^
c �
a C
W v
my
C 7
O
L f
~ C
g
0
C O e
O C
C Q
O
ti
W
f
E
0
U
i
mB�NaooM mnmAONmm�dBoaNvmiNv�e�m$`rv"'i,8�i`a,"�,��'o,vmi, `3nn"a3 a `a SoNmma ^m ^o �Momnmumi8 d mmom a r�mnaoao,on u�
ci o+�c oio oioy Mao.=mui$$mmrld.mmmmvNi3M^mnvmi�ooa"a3$mnm 122 a a' 22 o N g 9 m m m`9 m�v�goy rn
m����N c�im mmmmm8 mm m88�mmNvmi vmi in u'S
m m h n b n n b m m- ------ m m N
a
mI` nm O01 V� hNtr th 0 fF v O0 O) N Oi C m O g a G NN 0O :E fm m 0 cq aappdm �n0 h . n . NaC. NmN0 dM m m N 0
M m O m n 0 N O N m O) N N N N N N F d N 1100 N �n r �n n n n �n �n n A. . . 0
C)
N
h 0 0 n r N 0 n V N N N N O N b N pr NNm N N O m N N N N .. d m 0 f0 N p< O OO O N q upp b th cOO O N< M d h m�m � Qyy �Nyy n h m M
O1 C N. N N N N N N O' N W W W m amD W mm W N O W 6 N m N N N Oo N O m N N N N N N N N N N N a o v v v v e d m m
Y� N N N N N N m N� m m m� h h h h h h N m h N h h YJ N h h N h h h h N N h h h h h N N h h h h m m m m in m m Y1 h N h
mdmN N NN N N N V 4 9 NYN m[NNNN N
BA�SIt9m m 111
mml2991y919195molo2 mmnnnnnnAr.
T
a a a
o00
N N th lh d d YJ m m m m m O m 0 0 N N N M < O N N N 1..N m mm m Om 00 cm .. N NO N N N S ..... O O p
.. r r n r r n .. r r r r m m m m m m m m w... m m c0
mroro�crorororoai
2
roro�croromm ro �c mai ai �cro c�c �cro mmmmmromaimmmmmmmmmmrommromroainnnnnn An
0 0 0
Q°p
SoSC6
2 2 S
o 0 0 0 0 0 0 0 0 0 o S 8 8 8 8 S 8 8 S mp 8 8 8 S e e e S 8 8 8 8 8 8 8 8 8 8 8 8 8 S 8 8 8 8 8 8 8 8 8 S oo 00 00 o 8 8 D 0 0 0 0 0 0 O N O O O
^
G O G G C M M M N N lV C O G O 0 0 t�l m M N N fV fV O C o 0 0 o.. m lV lV lV C C o o 0 o o m cM c6 c] M th M o (� M C o 0 0 C O
d
G
F
U U d
AO m
fo 0 0 to J co Vl N J J w u) V) fo (o (o K K K (o fo d' K N m (o N 0 N J J J N N J (o N m N !o m N K O: K K K K K K K LL' 0 fo 0 w to �
C9 U�
p + _
U 3 3
fo
J
S 2 S 2 S S J m W S S S 2 S S N m J d d S 2 2 2 S 2 m m 2 2 2 2 2 S S O S S 2 S 2 2 T
N m M J O O O J J N S 8 8 8 8 8 0 0 0
I� N
m I�
d mm L600 mm moo v00000000.
ymN 0-
N
=
N f0
a>
•`
yy op m mm m cc�� yy
d m r m N m N YW1 N N h< W N m N O d 0 M m$ V n O N lh (O r N m m m N n m N m n O N O N N N O h N Q m Id. % cc
d m N N
a
y yy y pp c� D a m rrVNVpp m m Sm N m m' Q N O N O m n O m N S< S v m 0 8 m 8 1 m 0 8 m 0 N N O GD N N O m y
O N M M M d d d m N N m r m m N 0 0 0 N N lh d d m m 298 O N m r A 9 C p
=
L
7 0 0 0 O O O O
' ' ' ' 1 -- ' 1' 1' ' '' 1 N N N N N N N N N N N N N N N N th M S, N N N M m M L
D Qf
a
g s
io
W
au
m�
O 8 N N N
Wm
hmm pN
0N 0N 1N ONN mmA
1M nN
mN NNN
O[O
ho0CJ
mfMV NNm
9NJ mCJ mN
E
y�yJ N �
NmQNmNNVVNJJ NN
NN
OCa')
rMccy)
N Oth
NNNmmN N AnmN 0ttp+1
NN <N
�
OOi00- 2
N NNNN N N N tmp+� N A
m
U
C
�
yy .
rm C N . N N ..h S N .. ciN
NM
Nm
NN mN ....8fG
«ro O°d
C(a+O
8 0C16 �O
- - m
N -
m-bm M y
-
6
- -
C- - - - - - - - -
- - - - - m
- - c
O
to
O
U
y� ttVV aa m pp yy c� m y�
Q N -0O O M 8 m m r N n n m m W O Q O� r n m m r r r N m N 0 d M N O O m m M O 0 0 < Am N th d l� m
O O
y
h h a G Oi Ol Qi O N th d a Y> d N C Oi Oi Oi O N N N N N V �2-- N- N N
�ni rrrA r nn rrArnAnnnrnrrrnnAr=�nAnrA Anl�amrrrl=Ari rrrrro.8mm8�8mm
pS
O
E
ia�am
'Nn ia� N gcRq . . .00S vrm.N�o��.0000ro a�nm8aa a c"iv uri����amamvoi �
.a
ogo
y g
np mrrr ym y yryi pN oaai rcnn yn ayi �+i �yiNN�ppi Oy va' y d
����� m'SH m8 mn m' mmr°m Nm vNi S e
0. W N N. N. m N N Qi � � m
ooc
m m m
D m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m
U �
m
ommmm �nNMineriNoee"�,aa�nvi,v>�nv�v`"i,voov. . . . . . . . . ..".�.avvoavaea$$ova o=
$88
N� oNp N N N N O O O O O O p Np o N N
h M N N M N t� th m t0 M M M th th th th M M th th M M M M ch M M M M M lh N N N N m M M m th N o p
8 8
O
�
yy pp pp dd pp aa p�
O N N n m d d d d d d d O m A m A m
r n M1 n 0 4 A cl th d M lh Ol M lh M lh O N N N N M d d� O d V O S ... V h h YO> h h h N h 8 iA N N H h h h N �� m m
S m 0 O m 0 m m O m m m m m m b^ m m m m m O O m m 0 O Oi m O m m O m. C G. � N a a 6 e a a a LL
9 m m m m m m W m m m Oi m m m m O� m b Qi m m m m m m m m m m m N N 0 0 0 0 m
- - - - - - -
Q
N
� U
p p p p N
O 8 8 m W S O O O O V O O O O O O O S O O O Yn1 O O O S O N m S O S O O O 8 Oo Sp S O h N O S Sp O O O Oo S N Op O O O O m
g p o p
pm p
m 0 p N S
D[0 0 d N .. m IN m W N N N. W. W W . O 0 0 0 o 0 0 8 O O O O O O O 8 g g g g a O d N m o m N O o N N N N N N N
N
pp O
8 O O - n
t`
OJ
N
_
a A A 'o � ro
f m
cOi
IL 0 a
z � A t t w A z g z" A z g t" ❑ >>
—
Q
_r,,
W N
O
0
z
i
0
N N N N N
i a a a a a a a a
L S x x S x S x S
b c5 of of o5 �_ �_ cS oS
L x x x x 2 2 2 S
c� c�0c�c�0c�
�3�333333
L m m m M, m m m m
C
E
E
O
V
0
�n
0
m
a
2
a
04
C)
O
N
0
N
a
2
a
LO
N f0
d �
L
a
m W
a "
a cu
m -0
0
E
0 �
O
U c%
C
C
f0
O
LL
O
E
0
0
U
0
Vertical Section Plane
(0.00 ft N, 0.00 ft E) @ 310.00° Vertical Section (ft)
Vertical Section Plane
(0.00 ft N, 0.00 ft E) @ 310.000 Vertical Section (ft)
Schlumberger-Private
.i
WEST (ft) EAST
-2a000 -16" -120DO -BOW -4000 6 3�
WEST (ft) EAST
SchIumberger-Private
N
LO
O
� O
L �
a
m `m d
� � c
LL
U p
c0 c U
N N O —
�pdoU �o'o
Nai o ' y
ii m CC,
J Q M. 'L*q L .
J c`7 y 2 0 0 m
� 2 W C] Q N 0
m m
m
m m 0 0 L
N F � eo L1 L
��//��
m y C N
cn N m C N O m m
m ro a m a .N m E
C_
O Q
•N m C
m v
a
; C
O m
V w
N m
V
O i
Q X J
N m
/\ o T J
N m'
a E
\� tT N
ID
� C
m
r a�
= o cD
f
U c, ?
O 7 ` 3
O m O O
m O16 M
m C m O) O T L
m m 7 07 3 O
0 o O O 'O
fn C
�, m a a > o O Q mc
0 o o n c
C O O O M f7 U N w t
•mi m U U 2 2 2 N
L V U
C •p V .. ` C m C o
C m O m O U ` m
a-ui7L 3mv� F .0 N
m
a
G t U
N —
>m
Ln
N
O
)
E r
w
m
N
-
m m
Li
o
p o °c a m 0
3 d
O
a
a
a
a
a
a p
N
d c Q
c =
Q Q
c
c
c
Q
.. x
W
f
E
W
C LU
L
`o
.m
O
>
m p
'm
L
L
Y
0
0
�
O
O
N
t0
O
C
LL
lL
0
O
0
0
0 0
v
_m
Q
A
v A
0
O
00
LA
n
n
m n
n n
j L.OA°
M
M
M
N V LO O
IWO
Lh CO
2 N N
M O
N
Lh O
M p
NN�m
n
n
n n n
E
n
N M
N M
•`
m
n m
LAo
n cno
F
m
O
O O O O O M
O O M
O M
O M
O M
C x
O
O O O O O m
O O m
O m
O m
O m
m
O
M
O O O O O M
V t() W A m
0 0 L7
M N m
O M
M m
O M
M m
O M
M m
O
O O O O O O
O O O
O O
0 0
0 0
C
O
LL
LL LL LL LL LL LLCf)
fL LL LL
LL LL
LL LL
LL LL
�
co
O
M M M 0 to 0
O 0 0 0 0 0
N M N
0
M M
M N
M
G
ao w o
0 0
v n M
0 0
o m
0 0
ao M
0 0 0
m
O m n
O
N N
v
N O
L1 V
O
O O r- Nl LA a0
r- N
to m
tp
O M
N
V
M A
fA IL
t0
fp A M N V f0
N O
N M
O R
n
N
N < m O m M
m O
m
fp N
N
V ,-
3
O
M
O N n O O
M t0
m CO
M V
M
O
A A
O A
n 0
Q
Q
N
O N M N A
V N
rp m
m N
O N
O M
N
N N N M
O � K
V
m W
O
O
N
m
N
M
W
C
� �+
O
N
O A O N N A
O O W O O M
M N O
n N ap
O O
N W
ry
�
M
M r N M n R
W t0 (O m O
t0 m 12
LO O
O O
m
m a
�'
m f
y
O
O O O M N N
O n o
f0 M
7 M
M N
'-
N M
to
FL
o
0 0
m �'
rn N o
m
m
`r
cm,
N�2
Lmv
to N
N
n
m M
U
�
N
a
m
m
'`
N
M d
N Ul
0
o
00
of p
of p
o p
F
N
N
C2 N
AN C
as
xaa
xaa
xaa
0
/
Da.\
N
\ -0 -0
{
(SEE
)I33±77\
� ;
k _ t5
2
@ 0
4§�a�■mm
4,
| §
)
\
_
§
E
-
U.
\6>55«®R
fa
`p
k
$ $`/§
J
J
k
s s ] x
k
3
w
01
(D
CD«2
\
§
c
c
§
{
A
■
\
/
_
2
\
k
\
�■
IFw
*
www=
*w
�
§
Cl)
(
(j\§
\\
k§
�
C
\
\
\\\\
\\
s
3
«2$2
$R
/ m
LL
■
\
'
,
,
,
■
co
J
,
a
�w
s�°
§
c =
C4 co m
co
J
E
3
\/
)
}
}\)
0
k
ƒ ƒ ƒ
§\� ]\� ]\�
}\) }\) }\)
Traveling Cylinder Plot
NoGo Reglcn EOU's based on Onontod EOU Dimension - Minor Risk W
Ant, -Collis -on ruin used. DBM AnIiCOlhmon Standard 5002 v5 115.2
280
270
260
North
350 0 10
190 180 170
Production
TRAVELING CYLINDER PLOT
Client
eiuocrosi
Field
Cos-opoiitan Unit
Structure
Cosmopolitan Pad
'Nell
H13
6orohole
H13-LO®
Date
30-Jan-2019
80
90
100
Sch lumberger-Private
llueNest
Energy
Attachmer
kf$t
Cosmopolitan Project
H13 10-401 L06 Fishbone APD Attachments
H13 10-401 L06 Fishbone APD Attachments
NOTE:
The Rib Laterals in H13 are left as open
hole completions after drilling, and as
such, there are no casing design nor
cement volume calculations to present in
this section of the respective L01 through
L07 Lateral APD's.
llueNest
Energy
Attachment 4:
4010
Cosmopolitan Project
H 13 10-401 L06 Fishbone APD Attachments
H13 10-401 !06 Fishbone APD Attachments
NOTE:
The Rib Laterals in H13 are left as open
hole completions after drilling, and the
only FIT's taken in H13 will be below the
13-3/8" and 9-5/8" shoes in the mainbore.
As such there are no FIT Procedures to
present in this section of the respective
L01 through L07 Lateral APD's.
IuNest
Energy
Attachment 5:
J! anifold
Cosmopolitan Project
H13 10-401 L06Fishbone APD Attachments
H13 10-401 L06 Fishbone APD Attachments
O
Z
C�
m
CD
m
w
Z
w
Cn
w
m
U
IJ
J
m
00
1-1
O
�
�
O
O
O
O
c
E
c
cn
laf U-)
O
clf Ln
O
It
LO
_
�>
N
Cl->
N N
m
N
\ 00
N
cn O
C�
\
N
O
_O
---- O
_O
J
p
U)
O
p- V
N
p Ul
—
=
(n
>x
O
°4-1
Cl)
_p
p
O\
O
Q
O
O O
U (�
E =
O
O
_
Oran
_
+-
1
C ')
,�
O
N
N
O
r�
rn
N
Y
0
C
O U N N U N O N U U U Q)
> > > > > > > > > > >
O O O O O O O O O O O O
> > > > > > > > > > > Y
'O "_O "_O -O _0 'O 'O -_O -O "O "O O
O O O O O O O O O O O
�t �t v- It- It wt t- t-- �L- �L- U
3 C C C C C C C C C C C (U -`1
O O O O O O v O O O v 1 O
E E E E E E E E E E E 0 U
V) to (n (n co w w (n (n (n (n (n U U
J J J J J J J J J J J J U
LL LL LL LL LL LL LL LL LL LL LL LL — O
O
C C C C C C C C C C C C O N
O O O O O O O O O O O O L
L L L. L L L. L L L L. L '0
U U U U U U U U U U U U >� U
E E E E E E E E E E E E = O
O v v v O v v v v v v v
U U U U U U U U U U U U O 0
U �
Y Y Y Y Y Y Y Y Y Y Y Y Q C
O O O O O O O O O O O O 3
O cD cD cD w cD cD cD cD cD CO cD cD cD
\ \ \ \ \ \ \ \ \ \ \ \ \ \
00000000000000
n n n
0
z �
U O
n,, E
a�
z
(D U v
n Cn E
z
U
W O
C /
W �
ry
U O
W
D O
m U
'it
W
0
c
O
0
O
(L)
0
>
a>
0
>
a)
0
>
a)
0
>
(1)
0
>
a>
0
>
a)
0
>
m
0
>
a>
0
>
(L)
0
>
a)
0
>
Y
N
-O
O
70
O
U
O
'0
O
"0
O
_0
O
_0
O
_0
O
'O
O
-O
O
_
O
O
m
C
E
C
O
E
C
0
E
C
0
E
C
0
E
C
0
E
C
a
E
C
0
E
C
0
E
C
0
E
C
O
E
O
Y
0
O
U
Un
J
LL
Un
J
LL
Un
J
Li
(n
J
Li
Un
J
LL
Un
J
Li
Un
J
LL
(n
J
LL.
Un
J
L.L
(n
J
LL
N
_i
LL
(n
J
LL
U
_V
5
N
a
0
C
O
E
C
O
E
C
O
E
C
O
E
C
O
E
C
O
E
C
O
E
C
O
E
C
O
E
C
O
E
C
O
E
C
O
E
0
L
_
U
�_
U
O
U
O
U
O
U
O
0
O
U
O
U
O
U
O
U
O
U
O
U
O
U
O
O
U
?i
0
�
0
�_
\
c0
\
w
\
w
\
cD
\
O
\
w
\
c0
\
cD
\
cD
\
cD
\
cD
\
cD
.71
cD
\
N
O
r7
O
V) rM
O O
r7
O
r )
O
M
O
O
r7
O
O
O
M
O
M
O
r�)
O
O
C—
O
z u
.T�
O
0
W C
-C E
L.J_ 0
O
W U
z �
w O
C
O
W �
O
m O
N
c
O
O
m
c
L
0
r
U)
IuNest
Energy
Attachment 6:
Cosmopolitan Project
H13 10-401 L06 Fishbone APD Attachments
H13 10-401 L06 Fishbone APD Attachments
/ue)erst
Energy
M
I
......_x 15i
e
A '
i
(
I
t
I
I
(
I
I I
,'O- 00 C$/r_ _ �
9 Sla1COM— +_
1/lb, S,OW Psi MSF
23 SV 5.an, v1i
i�
-Va, 9I-Kof f
--4 we, CSG HGR
13 Slb' S,Xm PSI
I
—13 M'fLUTED
i MMDREI MA%tQ
Cosmopolitan Project
Wellhead/Tree
10-401 APD Attachments
Wellhead/Tree
llueNest
Energy
Attach
Cosmopolitan Project
H13_10-401_L06_Fishbone APD Attachments
H13 10-401 L06 Fishbone APD Attachments
NOTE:
The Rib Laterals in H13 are to be drilled
below the 9-5/8" casing shoe using the
BlueCrest Rig 1 BOP stack and choke
manifold for well control (no Diverter
system applicable), and as such, there are
no Diverter Schematics to present in this
section of the respective L01 through L07
Lateral APD's.
llueNest
Energy
Attachment 8:
Cosmopolitan Project
H13 10-401 L06 Fishbone APD Attachments
H13 10-401 L06 Fishbone APD Attachments
H-13 Multi -Lateral Producer
Scale
Date
1:30000
04/01/2019
Prepared by.•
Field
ABuchanan
Cosmopolitan
Exception
0 1000 2000 3000 4000 5000ftUS
lueNest
Energy
Attach
Cosmopolitan Project
H13 10-401 1-06 Fishbone APD Attachments
H13 10-401 LOG Fishbone APD Attachments
WELL #13
N.A.D.83
N: 2144552.25 E: 1308873.45
LAT: 59'51'29.25"N LON: 151'48'13.05"W
N.A.D.27
N: 2144793.15 E: 168845.47
LAT: 59'51'31.42"N LON: 151'48'05.31 "W
1504' F.E.L.
2285' F.S.L.
GROUND (PAD) ELEVATION
PLANT: 98.5'
NAVD 88: 146.2'
3.77
WELL #13 OW
W
NOTE:
1. STATE PLANE AND GEOGRAPHIC COORDINATES ARE ALASKA STATE
PLANE, ZONE 4, N.A.D.83 AND AND N.A.D.27 AS LABELED.
2. COORDINATES ESTABLISHED FROM STATIC CPS OBSERVATIONS.
3. ALL DISTANCES SHOWN ARE GROUND.
4. THE NGS COORDINATE CONVERSION AND TRANSFORMATION TOOL
(NCAT) WAS USED FOR NAD83(2011) TO NATO 27 CONVERSIONS.
O = AS STAKED CONDUCTOR LOCATION
I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO
PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT
REPRESENTS A SURVEY DONE BY ME OR UNDER MY DIRECT SUPERVISION
AND THAT ALL DIMENSIONS AND OTHER DETAILS PER THIS REVISION ARE
CORRECT AS OF DECEMBER 19, 2018.
b 1 TALL TREE AVEN\\Ij N
N
4S R15W Ok T,
MP 150
SEC 2 C e ;
ys v�f StARisci ,
Y I— Pig (+ DCE RD
O LU
O J NA7 NA DR
U 2 AMAN ROSE D
N
m
J� Z 4J
's% = T4S R15W
SEC 1
I3 rrTHI�S� SURVEY
i
T4S R15W
SEC 11
MP 151
l VICINITY MAP 1" = 1 /2 MILE I
1V
0 5 10
( IN FEET )
1 inch = 10 ft
C- 7
i
i
. . ......................
.JACOB GERONDALE:'
LS-11758
r1III t�{l\ IO \-
AS STAKED SURVEY
BLUECREST ENERGY
WELL #13
WITHIN SECTION 2 T4S R15W S.M., AK.
LOUNSBURY & ASSOCIATES, INC.
Surveyors — Engineers — Planners
5300 A STREET, ANCHORAGE, ALASKA 272-5451
)ATE OF SURVEY: 1 10 2019 STAKED: 1 10 2019
FIELD BOOK No.: 16-014-1 AS BUILT:
GRID: ANCHOR POINT RECERT:
llueNest
Energy
Attachment 10:
Cosmopolitan Project
H13_10-401_L0o_Fishbone APD Attachments
H13 10-401 L06 Fishbone APD Attachments
TRANSMITTAL LETTER CHECKLIST
WELL NAME:
PTD:
Development _ Service _ Exploratory Stratigraphic Test _ Non -Conventional
FIELD: �� POOL: etG , /
'/
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. 21- API No. 50- 2��_�=
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
- from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. ompany Name) Operator
assumes the liability of any rote t to a spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool HANSEN, HANSEN UNDEF OIL - 290100
_ _
_ Well Name: HANSEN H-13-LO6 — Program DEV Well bore seg SePTD#:2190290
Company BLUECREST ALASKA OPERATING LLC -_ Initial Class/Type
DEV / PEND-_GeoArea 820 - Unit 10370 - _ On/Off Shore On Annular Disposal ❑
Administration
17
Nonconven. gas conforms to AS31.05.0306.1.A),(j.2.A-D)
NA
1
Permit fee attached
NA
2
Lease number appropriate- - -
Yes
Surface location in Fee Hansen property, -well passes through ADL018790 and ADL 391309'
3
Unique well name and number
Yes -
top of productive interval and TD-in ADL 384403.
4
Well located in a defined pool - -
No
HANSEN_, HANSEN UNDEF OIL - 290100, governed by statewide spacing regulations.
5
Well located proper distance from drilling unit boundary- -
Yes
6
Well located proper distance from other wells
No
SPACING EXCEPTION NEEDED:- Well branch lies within same governmentalquartersection and
7
Sufficient acreageavailablein drilling unit - - - - -
Yes
1,000' of H-13 and separate, fish -bone lateral well branches. Order issued 2/22/2019. SFD -
8
If deviated, is wellbore platincludedYes
-
9
Operator only affected party - -
Yes
10
Operator has appropriate_ bond in force
Yes
Appr Date
11
Permit can be issued without conservation order-
No
SFD 2/22/2019
12
Permit can be issued without administrativeapproval-
Yes
13
Can permit be approved before 15-day wait-
Yes -
�14
Well located within area and strata authorized byInjectionOrder# (put 10# in comments) -(For
NA
15
All wells within 1/4 mile area of review identified (For service well only)
NA
16
Pre -produced injector: duration of pre production less_ than 3 months (For service well only)
NA
118
Conductor string provided
Yes
See -PTD 219-023 for details. H-13 motherbore
Engineering
19
Surface casing protects all known- USDWs
Yes
20
CMT vol adequate to circulate -on conductor & Surf csg
Yes
- -
I21
CMT voladequateto tie-in long string to surf csg-
No-
22
CMT will cover all known productive horizons
Yes
23
Casing designs adequate for C, T, B & permafrost-
Yes
24
Adequate tankage or reserve pit -
Yes -
'25
If a re -drill, has a 10-403 for abandonment been approved
NA
grassroots well... laterals will be drilled of motherbore.
26
Adequate wellbore separation proposed -
Yes -
- - -
i27
If-diverter required, does it meetregulationsNA-
-
Diverter waived,
Appr Date
28
Drilling fluid program schematic-& equip list adequate
Yes -
-
GLS 3/4/2019
29
BOPEs, do they meet regulation
Yes
30
B-OPE-press rating appropriate; test to _(put psig in comments)
Yes
31
Chokemanifoldcomplies w/API RP-53 (May 84)_ - -
Yes
32
Work will occur without operation shutdown- -
Yes
33
Is presence of H2S gas probable
No
H2S not expected. Rig has sensors -and alarms.
I34
Mechanicalconditionof wells within AOR verified (For service well only)
NA -
135
Permit can be issued w/o hydrogen sulfide measures
Yes
H2S not observed in nearby Hansen wells. Rig has sensors -and alarms.
Geology
36
Data presented on potential overpressure zones
Yes
"J-shaped" well branch targeting Starichkof sand and Hemlock. Planned mud weights in -conjunction with
Appr Date
37
Seismic analysis of shallow gas -zones
NA
Managed Pressure Drilling technique appear adequate to control maximum anticipated downhole
SFD 2/13/2019
i38
Seabed condition survey (if off -shore)
NA
pressure of 9.66 ppg, which is based on MDT measurements of reservoirpressureinnearbywell.
39
Contact name/phone for weekly progress reports_ [exploratory only] -
NA
- -
Geologic Engineering Public Approval awaiting spacing exception order. SFD Order issued 2/22/2019. SFD
Date: Date Commissioner Date