Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout220-023From:Guhl, Meredith D (OGC) To:"Taylor, Jenna"; "Conklin, Amy A"; "Hobbs, Greg S" Subject:Expired CRU Permits Date:Wednesday, May 18, 2022 3:12:31 PM Hello, The following Permits to Drill, issued to ConocoPhillips Alaska, have expired under Regulation 20 AAC 25.005 (g). The PTDs will be marked expired in the AOGCC database. CRU CD4-28, PTD 220-023, Issued 5 May 2020 CRU CD4-28L1, PTD 220-024, Issued 5 May 2020 If you have any questions, please contact me. Thank you, Meredith Meredith Guhl (she/her) Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission 333 W. 7th Ave, Anchorage, AK 99501 meredith.guhl@alaska.gov Direct: (907) 793-1235 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at 907-793-1235 or meredith.guhl@alaska.gov. Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Chip Alvord Drilling Manager ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510-0360 Re: Colville River Field, Alpine Oil Pool, CRU CD5-28 ConocoPhillips Alaska, Inc. Permit to Drill Number: 220-023 Surface Location:449’ FNL, 2958’ FEL, SEC. 18, T11N, R4E, UM Bottomhole Location:682’ FNL, 4553’ FEL, SEC. 09, T10N, R4E, UM Dear Mr. Alvord: Enclosed is the approved application for the permit to drill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Jeremy M. Price Chair DATED this ___ day of May, 2020. JMPi 5 02/2021 See attached Conditions of Approval for the intermediate cement job and running the sonic logging. VTL 5/4/20 BOP test pressure to 3500 psig Annular preventer test pressure tp 2500 5/5/2020 5/5/2020 CRU CD5-28 (PTD 220-023) Conditions of Approval: Approval is granted to run the LWD-Sonic on upcoming well CRU CD5-28 with the following provisions: 1. CPAI will provide a written log evaluation/interpretation to the AOGCC along with the log as soon as they become available. The evaluation is to include/highlight the intervals of competent cement (and lengths) that CPAI is using to meet the objective requirements for annular isolation, reservoir isolation, or confining zone isolation etc. Providing the log without an evaluation/interpretation is not acceptable. 2. LWD sonic logs must show free pipe and Top of Cement, just as the e-line log does. CPAI must start the log at a depth to ensure the free pipe above the TOC is captured as well as the TOC. Starting the log below the actual TOC based on calculations predicting a different TOC will not be acceptable. 3. CPAI will provide a cement job summary report and evaluation along with the cement log and evaluation to the AOGCC when they become available 4. CPAI will provide the results of the FIT when available. 5. Depending on the cement job results indicated by the cement job report, the logs and the FIT, remedial measures or additional logging may be required. WELL PERMIT CHECKLISTCompanyConocoPhillips Alaska, Inc.Well Name:COLVILLE RIV UNIT CD5-28Initial Class/TypeDEV / PENDGeoArea890Unit50360On/Off ShoreOnProgramDEVField & PoolWell bore segAnnular DisposalPTD#:2200230COLVILLE RIVER, ALPINE OIL - 120100NA1Permit fee attachedYesASRC-NPR4 is a split lease containing surface location and a portion of the productive interval.2Lease number appropriateYesASRC-AA092344 contains top of prod interval; ASRC-NPR5 contains TD.3Unique well name and numberYesCOLVILLE RIVER, ALPINE OIL - 120100, governed by CO 443C.4Well located in a defined poolYesCO No. 443C has no interwell spacing restrictions. Wellbore will be more than 500'5Well located proper distance from drilling unit boundaryYesfrom an external property line where ownership or landownership changes.6Well located proper distance from other wellsYesToe of well lies in NW/4 of Section 9, outside of CO 443C Affected Area. Statewide spacing applies.7Sufficient acreage available in drilling unitYesAs planned, well will conform to all spacing requirements.8If deviated, is wellbore plat includedYes9Operator only affected partyYes10Operator has appropriate bond in forceYes11Permit can be issued without conservation orderYes12Permit can be issued without administrative approvalYes13Can permit be approved before 15-day waitNA14Well located within area and strata authorized by Injection Order # (put IO# in comments) (For sNA15All wells within 1/4 mile area of review identified (For service well only)NA16Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA17Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)Yes80' conductor driven18Conductor string providedYesSurface casing set to 2249' MD19Surface casing protects all known USDWsYes146% excess planned20CMT vol adequate to circulate on conductor & surf csgNo21CMT vol adequate to tie-in long string to surf csgNoProductive interval will be completed with perforated pipe and frac ports22CMT will cover all known productive horizonsYes23Casing designs adequate for C, T, B & permafrostYesRig has steel tanks; all waste to approved disposal wells24Adequate tankage or reserve pitNA25If a re-drill, has a 10-403 for abandonment been approvedYesAnti-collision analysis complete; no major risk failures26Adequate wellbore separation proposedYesDiverter size and route meet regulations27If diverter required, does it meet regulationsYesMax formation pressure is 3477 psig(8.5 ppg EMW); will drill w/ 8.8-10.8 ppg EMW28Drilling fluid program schematic & equip list adequateYes29BOPEs, do they meet regulationYesMPSP is 2687 psig; will test BOPs to 3500 psig30BOPE press rating appropriate; test to (put psig in comments)Yes31Choke manifold complies w/API RP-53 (May 84)Yes32Work will occur without operation shutdownYesH2S measures required33Is presence of H2S gas probableNA34Mechanical condition of wells within AOR verified (For service well only)NoH2S has been encountered in Alpine Oil Pool wells drilled from CD5 Pad. H2S measures required.35Permit can be issued w/o hydrogen sulfide measuresYesPlanned mud weights appear adequate to control the operator's forecast of most likely pore pressures36Data presented on potential overpressure zonesNAin the operator's geologic prognosis. No abnormally geo-pressured strata are anticipated. Managed37Seismic analysis of shallow gas zonesNAPressure Drilling technique and higher mud weights will be used to maintain borehole stability in shale38Seabed condition survey (if off-shore)NAsections.39Contact name/phone for weekly progress reports [exploratory only]ApprSFDDate3/5/2020ApprVTLDate4/21/2020ApprSFDDate3/5/2020AdministrationEngineeringGeologyGeologic Commissioner:Date:Engineering Commissioner:DatePublic CommissionerDateDaniel T. Seamount, Jr.Digitally signed by Daniel T. Seamount, Jr. Date: 2020.05.04 15:02:38 -08'00'JMP 5/5/2020JLC 5/4/2020