HomeMy WebLinkAbout221-008From:Guhl, Meredith D (OGC)
To:Abbie Barker; Carrie Janowski; Cody Dinger; Darci Horner - (C); Donna Ambruz; Jerimiah Galloway; Joseph
Lastufka; Josh Allely; Juanita Lovett; Tom Fouts
Subject:MPU Permits to Drill: 221-006, 221-007, 221-008, Permits Expired
Date:Friday, February 24, 2023 10:24:00 AM
Hello,
The following Permits to Drill, issued to Hilcorp Alaska LLC, have expired under Regulation 20 AAC
25.005 (g). The PTDs will be marked expired in the AOGCC database.
MPU F-22L1-01, PTD 221-006, Issued 28 January 2021
MPU F-18L1, PTD 221-007, Issued 1 February 2021
MPU F-18L1-01, PTD 221-008, Issued 1 February 2021
If you have any questions, please contact me.
Thank you,
Meredith
Meredith Guhl (she/her)
Petroleum Geology Assistant
Alaska Oil and Gas Conservation Commission
333 W. 7th Ave, Anchorage, AK 99501
meredith.guhl@alaska.gov
Direct: (907) 793-1235
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain
confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state
or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so
that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at 907-793-1235 or
meredith.guhl@alaska.gov.
CAUTION: This email originated from outside the State of Alaska mail system.
Do not click links or open attachments unless you recognize the sender and know
the content is safe.
From:Rixse, Melvin G (OGC)
To:Trevor Hyatt
Cc:Joseph Lastufka
Subject:20220118 1459 APPROVAL _ PBU V-105A - PTD: 221-080 - Perforate with Rig
Date:Tuesday, January 18, 2022 2:59:23 PM
Trevor,
Thanks for the procedure. Approved to proceed as described below.
Mel Rixse
Senior Petroleum Engineer (PE)
Alaska Oil and Gas Conservation Commission
907-793-1231 Office
907-223-3605 Cell
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or
privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an
unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake
in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov).
From: Trevor Hyatt <Trevor.Hyatt@hilcorp.com>
Sent: Tuesday, January 18, 2022 1:54 PM
To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>
Cc: Joseph Lastufka <Joseph.Lastufka@hilcorp.com>
Subject: RE: HAK PBU V-105A - PTD: 221-080 - Perforate with Rig
Mel,
Sure thing, see below for PBU V-105A Perf Plan:
1. Run liner to TD
2. Cement liner with cementing BHA
3. Circulate wellbore to KWF and flow check to confirm wellbore fluid is overbalanced to the
formation.
4. Trip out of hole and flow check. Lay down cementing BHA
5. Make up ~500’ of 1.56” perf guns, 6 SPF, 60 deg phasing.
a. Deploy guns on 1” CSH and Coil
b. 2” safety joint with crossovers will be available while handling perf guns
6. Perforate wellbore per plan and pull out of hole.
a. Ensure fluid is at surface
b. Flow check wellbore before laying down perf guns
CAUTION: This email originated from outside the State of Alaska mail system.
7. Nozzle run to freeze protect well
8. RDMO
Let me know if you need anything else.
Thanks,
Trevor Hyatt
Hilcorp Alaska, LLC
Drilling Engineer
Trevor.Hyatt@hilcorp.com
Cell: 907-223-3087
From: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>
Sent: Tuesday, January 18, 2022 2:14 PM
To: Trevor Hyatt <Trevor.Hyatt@hilcorp.com>
Subject: RE: [EXTERNAL] RE: HAK PBU V-105A - PTD: 221-080 - Perforate with Rig
Trevor,
Send me a short procedure. I realize it is a couple steps but describe:
you will be overbalanced and that
you will assure the well is dead / overbalanced and/or you will keep hole full before laying
down equipment etc.
Mel Rixse
Senior Petroleum Engineer (PE)
Alaska Oil and Gas Conservation Commission
907-793-1231 Office
907-223-3605 Cell
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or
privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an
unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake
in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov).
From: Trevor Hyatt <Trevor.Hyatt@hilcorp.com>
Sent: Tuesday, January 18, 2022 1:08 PM
To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>
Cc: Joseph Lastufka <Joseph.Lastufka@hilcorp.com>
Subject: RE: [EXTERNAL] RE: HAK PBU V-105A - PTD: 221-080 - Perforate with Rig
Do not click links or open attachments unless you recognize the sender and know
the content is safe.
Thank you, much appreciated. We will perforate V-105A with CDR2 under PTD: 221-080.
Trevor Hyatt
Hilcorp Alaska, LLC
Drilling Engineer
Trevor.Hyatt@hilcorp.com
Cell: 907-223-3087
From: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>
Sent: Tuesday, January 18, 2022 2:02 PM
To: Trevor Hyatt <Trevor.Hyatt@hilcorp.com>
Cc: Joseph Lastufka <Joseph.Lastufka@hilcorp.com>
Subject: [EXTERNAL] RE: HAK PBU V-105A - PTD: 221-080 - Perforate with Rig
Trevor,
Hilcorp is approved to perform extended perforating with CDR2 as has been past practice.
There is a long successful history of perforating with CTD rigs on the North Slope where there us
much more control with hole fill equipment and an annular preventer.
Hilcorp is not approved to perforate with open hole deployed guns from the top of a
wellhouse without lubrication/PCE. More controls will be required before those sundry applications
are approved.
Mel Rixse
Senior Petroleum Engineer (PE)
Alaska Oil and Gas Conservation Commission
907-793-1231 Office
907-223-3605 Cell
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or
privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an
unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake
in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov).
From: Trevor Hyatt <Trevor.Hyatt@hilcorp.com>
Sent: Tuesday, January 18, 2022 12:55 PM
To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>
Cc: Joseph Lastufka <Joseph.Lastufka@hilcorp.com>
Subject: HAK PBU V-105A - PTD: 221-080 - Perforate with Rig
CAUTION: This email originated from outside the State of Alaska mail system.
Do not click links or open attachments unless you recognize the sender and know
the content is safe.
Mel,
The original V-105A perforation plan was to utilize the post rig extended add perf procedure on
service coil. With that practice not being an option currently, we would like to perforate ~500’ on
the rig after we run liner and cement. The perforation guns will be 1.56”, 6 SPF, 60 deg phasing.
Let me know what you think and if you need anything else from us to perform this operation with
CDR2.
Thank you for your time and consideration.
Trevor Hyatt
Hilcorp Alaska, LLC
Drilling Engineer
Trevor.Hyatt@hilcorp.com
Cell: 907-223-3087
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility
is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility
is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Monty M Myers
Drilling Manager
Hilcorp Alaska, LLC
3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Re: Milne Point Field, Kuparuk Oil Pool, MPU F-18L1-01
Hilcorp Alaska, LLC
Permit to Drill Number: 221-008
Surface Location: 1873' FSL, 2340' FWL, Sec. 06, T13N, R10E, UM, AK
Bottomhole Location: 1817' FSL, 1725' FWL, Sec. 25, T14N, R09E, UM, AK
Dear Mr. Myers:
Enclosed is the approved application for the permit to drill the above referenced well.
The permit is for a new wellbore segment of existing well Permit No. 196-100, API No. 50-029-22681-
00-00. Production should continue to be reported as a function of the original API number stated above.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run
must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this
well.
This permit to drill does not exempt you from obtaining additional permits or an approval required by
law from other governmental agencies and does not authorize conducting drilling operations until all
other required permits and approvals have been issued. In addition, the AOGCC reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an
AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension
of the permit.
Sincerely,
Jeremy M. Price
Chair
DATED this ___ day of February, 2021.
Sincerely,
J M P i
1
1a. Type of Work: 1b. Proposed Well Class: Exploratory - Gas Service - WAG Service - Disp 1c. Specify if well is proposed for:
Drill Lateral Stratigraphic Test Development - Oil Service - Winj Single Zone Coalbed Gas Gas Hydrates
Redrill Reentry Exploratory - Oil Development - Gas Service - Supply Multiple Zone Geothermal Shale Gas
2. Operator Name: 5. Bond: Blanket Single Well 11. Well Name and Number:
Bond No.
3. Address: 6. Proposed Depth: 12. Field/Pool(s):
MD: 16,045' TVD: 7,090'
4a. Location of Well (Governmental Section): 7. Property Designation:
Surface:
Top of Productive Horizon: 8. DNR Approval Number: 13. Approximate Spud Date:
Total Depth: 9. Acres in Property: 14. Distance to Nearest Property:
4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 40.65' 15. Distance to Nearest Well Open
Surface: x-541744 y- 6035324 Zone-4 12.4' to Same Pool: 962'
16. Deviated wells: Kickoff depth: 14,435 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 125 degrees Downhole: Surface:
Hole Casing Weight Grade Coupling Length MD TVD MD TVD
4-1/4" 2-7/8" 6.5# L-80 STL 1,745' 14,300' 7,084' 16,045 7,090
19.PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations)
Junk (measured):
14,522'
TVD
112'
4,529'
7,512'
14,434' - 14,522' 7,178' - 7,240'
Hydraulic Fracture planned? Yes No
20. Attachments: Property Plat BOP Sketch Drilling Program Time v. Depth Plot Shallow Hazard Analysis
Diverter Sketch Seabed Report Drilling Fluid Program 20 AAC 25.050 requirements
Contact Name:
Contact Email:
Contact Phone:
Date:
Permit to Drill API Number: Permit Approval
Number: 50-029-22681-Date:
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales:
Samples req'd: Yes No Mud log req'd: Yes No
H2S measures: Yes No Directional svy req'd: Yes No
Spacing exception req'd: Yes No Inclination-only svy req'd: Yes No
Post initial injection MIT req'd: Yes No
APPROVED BY
Approved by: COMMISSIONER THE COMMISSION Date:
Sr Pet Eng Sr Pet Geo Sr Res Eng
April 1, 2021
Authorized Name: Monty Myers
Authorized Title: Drilling Manager
Sean McLaughlin
sean.mclaughlin@hilcorp.com
18. Casing Program: Top - Setting Depth - BottomSpecifications
3206
MPU F-18L1-01
Milne Point Field
Kuparuk Oil Pool
3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503
Hilcorp Alaska, LLC
1873' FSL, 2340' FWL, Sec. 06, T13N, R10E, UM, AK ADL 025509, 388235 & 355018
022224484
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
2489
699' FSL, 947' FWL, Sec. 25, T14N, R09E, UM, AK
1817' FSL, 1725' FWL, Sec. 25, T14N, R09E, UM, AK
94-019
9536 7,335'
Cement Quantity, c.f. or sacks
Cement Volume MDSize
Plugs (measured):
(including stage data)
Effect. Depth TVD (ft):
14,834'
Effect. Depth MD (ft):
7,456'14,941'7,530'
LengthCasing
None
Total Depth MD (ft): Total Depth TVD (ft):
Liner
Intermediate
14,915'7"
Surface
Conductor/Structural 20"80'
7,914'7,914'
14,915'
9-5/8"
Authorized Signature:
220 sx Class 'G'Production
See cover letter for other
requirements.61-00
Perforation Depth MD (ft):
21. I hereby certify that the foregoing is true and the procedure approved herein will not be
deviated from without prior written approval.
Commission Use Only
Perforation Depth TVD (ft):
GL / BF Elevation above MSL (ft):
1600 sx PF 'E', 600 sx 'G', 150 sx PF 'E'
250 sx Arctic Set (Approx.) 112'
Uncemented Solid / Slotted Liner
Form 10-401 Revised 3/2020 This permit is valid for 24 months from the date of approval per 20 AAC 25.005(g)
1.19.2021
By Samantha Carlisle at 11:08 am, Jan 19, 2021
Digitally signed by Monty M Myers
DN: cn=Monty M Myers, c=US,
o=Hilcorp Alaska, LLC, ou=Technical
Services - AK Drilling,
email=mmyers@hilcorp.com
Reason: I am approving this document
Date: 2021.01.19 10:10:04 -09'00'
Monty M
Myers
MGR28JAN2021
BOPE test to 3500 psi.
DSR-1/19/21
221-008
SFD 1/21/2021GR22222228JAN2021
2/1/21
2/1/21
Redacted M. Guhl 8/18/2021
PTD API WELL STATUSDistanceTop ofKuparuk Top of Cement Annulus IntegrityZonal Isolation196100 500292268100 F-18 ESP Producer 0'14,364' MD(7,130' TVD)13,489'MD (est)(6,558' TVD)Tested 7" CSG to 3,500psi 6/15/19967" casing cemented with 220 sks (48 bbls) 15.8 ppgClass G cement inside 8-1/2" hole. Bumped plug.Estimated TOC at 13,489' MD (assumes 30%washout). No CBL ran. 9-5/8" casing cemented inside12-1/4" hole with 741 BBLS cement.195184 500292262300 F-29 ESP Producer 1,200'16,488' MD(7,153' TVD)~15,382' MD(6,458' TVD)Tested 7" CSG to 3,500psi 7/23/19967" casing cemented with 264 sks (54 bbls) Class Gcement inside 8-1/2" hole. Bumped plug. EstimatedCMT top at 15,382' MD (assumes 30% washout). 9-5/8" casing cemented inside 12-1/4" hole with 765BBLS cement.Area of Review MPU F-18L1 & L1-01
To: Alaska Oil & Gas Conservation Commission
From: Sean McLaughlin
Drilling Engineer
Date: January 15, 2021
Re: MPU F-18L1 & F-18L1-01 Permit to Drill Request
Approval is requested for permits to drill two CTD sidetracks laterals from well MPU F-18
with the Nabors CDR2 Coiled Tubing Drilling rig on or around April 2021.
Proposed plan for MPU F-18L1 and F-18L1-01 Injector:
Prior to drilling activities the wellbore will be prepared for a sidetrack (see F-18 Sundry request). The ESP
completion will be pulled, a CBL run, and a 4-1/2” injection string run. An E-line unit will set a CTD whipstock in
the Kuparuk interval at 14432’.
CDR2 will mill a 3.80” window through 7” casing and into the A sand. The first lateral with be drilled into a
neighbouring fault block to 15,900’. The 2-7/8” solid/slotted liner will be run with a liner top billet placed at 14,750’.
The second lateral will target a different fault block and will be drilled to 16,045’. This lateral will be completed with
a 2-7/8” solid/slotted liner brought back to the tubing. A liner top pack will isolate injection for the near wellbore
area.
The following describes the work planned. A wellbore schematic of the current well and proposed sidetrack is
attached for reference.
Pre-Rig Work:
1. Reference MPU F-18 Sundry submitted in concert with this PTD request
2. General work scope of Pre-Rig work:
a. Rig: Pull ESP completion
b. Eline: Run CBL
c. Rig: Run 4-1/2” Injection string
d. E-line: Set 4-1/2” x 7” whipstock at 14,432’, 0 deg ROHS
Rig Work:
3. MIRU and test BOPE to 3500 psi. MASP with gas (0.10 psi/ft) to surface is 2489 psi
a. Give AOGCC 24hr notice prior to BOPE test
b. Test against swab and master valves (No TWC)
c. Load pits with 8.8 ppg mud
d. Open well and ensure zero pressure
4. Mill 3.80” single string window plus 10’ of rathole.
a. TOWS at 14432’, 0 ROHS.
b. Mill window with straight motor
c. MPD or pressure deployment is not required for the window milling run
i. SBHPS run 12/20/20 -8.6 ppg EMW at window
5. Drill and complete the “L1” sidetrack
a. 3.0” BHA with GR/RES
b. Drill with bicenter bit (4.25”)
i. Target constant bottom hole pressure of 11.8 ppg for entire sidetrack
ii. Pressure deployment will be required
c. 40 deg build section – 326’
d. 12 deg lateral section - 1142’
e. Planned fault crossing at 15540’.
i. Transition from an 8.6 ppg to a 5.4 ppg reservoir.
f. Planned TD 15900’
g. After TD and on the last trip out of hole lay in KWF in preparation for liner run
PTDs
Sundry 321-024
h. Run 2-7/8” solid/slotted liner with liner top billet placed at 14750’.
i. Solid liner run to the fault, Slotted liner past fault to TD
ii. Have 2-3/8” safety joint with TIW valve ready to be picked up while running liner
iii. Liner may be run in two sections if weight transfer or hole conditions is poor
6. Drill and complete the L1-01 sidetrack
a. Recover KWF and swap well to 8.8 ppg mud
b. Mill off billet with bicenter bit and continue drilling lateral
c. Planned fault crossing at 15680’
i. Transition from a 8.6 ppg to a 3.6 ppg reservoir
d. Planned TD of 16045’
e. After TD and on the last trip out of hole lay in KWF in preparation for liner run
f. Run 2-7/8” solid/slotted liner with liner top placed in the tubing tail
i. Soild liner run to the fault
ii. Have 2-3/8” safety joint with TIW valve ready to be picked up while running liner
iii. Liner may be run in two sections if weight transfer or hole conditions is poor
g. After releasing from the liner swap the well over to 2% KCl
i. The well will be 75 psi underbalanced.
h. Freeze protect well from 2000’
Post Rig:
1. V: Tree work as necessary
2. S: Install LTP
Managed Pressure Drilling:
The history of CTD at KRU in the Kuparuk reservoir, has demonstrated the benefits of a managed pressure drilling
technique. Due to uncertainties about the bottom hole pressures to be encountered as this sidetrack is drilled,
managed pressure drilling techniques will be employed on this well. The intent is to provide constant bottom hole
pressure by using 8.8 ppg drilling fluid in combination with annular friction losses and applied surface pressure.
Constant BHP will be utilized to reduce pressure fluctuations to help with hole stability. Applying annular friction
and choke pressure also allow use of lighter drilling fluid and minimizes fluid losses and/or fracturing at the end of
the long well bores. A MPD choke for regulating surface pressure is located between the WC choke manifold and
the mud pits and will be independent of the WC choke.
Deployment of the BHA under trapped wellhead pressure will be necessary. Pressure deployment of the BHA will
be accomplished utilizing 3” pipe/slip rams (see attached BOP configurations). The annular preventer will act as a
secondary containment during deployment and not as a stripper.
Operating parameters and fluid densities will be adjusted based on real-time bottom hole pressure measurements
while drilling and shale behavior. The following scenario is expected for MPF-18L1 and F-18L1-01:
x Latest reservoir pressure in the parent well: 3206 psi (8.6 ppg)
MPD Pressure at the MPU F-18A & AL1 Planned Window (14432’ MD - 7137’ TVD)
Pumps On Pumps Off
A Target BHP at Window (ppg) 4380 psi 4380 psi
11.8
B Annular friction - ECD (psi/ft) 866 psi 0 psi
0.06
C Mud Hydrostatic (ppg) 3266 psi 3266 psi
8.8
B+C Mud + ECD Combined 4132 psi 3266 psi
(no choke pressure)
A-(B+C) Choke Pressure Required to Maintain 248 psi 1114 psi
Target BHP at window and deeper
Operation Details:
Reservoir Pressure:
x The maximum reservoir pressure for F-18L1 and F-18L1-01 is expected to be 3206 psi at 7170’ TVDSS
(8.6 ppg equivalent).
x Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2489 psi.
Mud Program:
x Drilling: Minimum MW of 8.8 ppg KCL with Geovis for drilling. Managed pressure used to maintain
constant BHP.
x Completion: A minimum MW 8.8 ppg KWF to be used for liner deployment (11.8ppg brine may be used to
maintain constant bottom hole pressure while running liner).
Disposal:
x All cuttings & mud generated during drilling operations will be hauled to the Milne Point “B” pad G&I facility.
Hole Size:
x 4.25” bicenter hole for entirety of the sidetrack.
Liner Program:
x F-18L1: 2-7/8”, 6.5#, L-80 solid liner: 14750’ MD – 15540’ MD (run with liner top billet)
x F-18L1: 2-7/8”, 6.5#, L-80 slotted liner: 15540’ MD – 15900’ MD (from fault to TD)
x F-18L1-01: 2-7/8”, 6.5#, L-80 solid liner: 14300’ MD – 15680’ MD (liner top inside 4-1/2 tubing tail)
x F-18L1-01: 2-7/8”, 6.5#, L-80 slotted liner: 15680’ MD – 16045’ MD (from fault to TD)
x No Cement. A liner top packer will be run post rig to facilitate injection into the new fault block.
Well Control:
x Primary well control will be a minimum MW of 8.8 ppg KCL (75 psi overbalanced)
x 4 Ram BOP diagram is attached. MPD and pressure deployment is planned.
x Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi.
x The annular preventer will be tested to 250 psi and 3,500 psi.
x An X-over shall be made up to a 2-3/8” safety joint including a TIW valve for all tubulars ran in hole.
o Exemption request to 20 AAC 25.036 - Liner rams in the BOPE. A 2-3/8” safety joint will be
utilized while running 2-7/8” slotted liner. The desire is to keep the same standing orders for the
entire liner run and not change shut in techniques (run safety joint with pre-installed TIW valve).
When closing on a 2-3/8” safety joint 2 sets of rams will be available, above and below the flow
cross providing better well control options.
Directional:
x Directional plan attached. Maximum planned hole angle is 120°
x Inclination at kick off point is 45°.
x Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
x Distance to nearest property line – 7335’
x Distance to nearest well within pool – 962’ (F-29)
Logging:
x MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section.
x Real time bore pressure to aid in MPD and ECD management.
Perforating:
x No perforating, slotted liner.
Anti-Collision Failures:
x No failures for F-18L1 or F-18L1-01
Hazards:
x MPU F-pad is not considered a high H2S pad. The highest recorded H2S well on the pad was from MPU
F-69 (47 ppm) in 2009. The maximum recorded value on F-18 is 6 ppm (12/17/2009). Drilling F-18
laterals has a low H2S risk.
x Fault crossing planned in each lateral. Potential to go from an 8.8 ppg EMW to 3.6 ppg EWM. Use mud
viscosity to mitigate differential sticking and losses.
x Medium lost circulation risk.
Sean McLaughlin CC: Well File
CTD Engineer Joseph Lastufka
907-223-6784
Potential to go from an 8.8 ppg EMW to 3.6 ppg EWM.
highest recorded H2S well on the pad was from MPU p
F-69 (47 ppm) in 2009.
_____________________________________________________________________________________
Revised By: TDF 12/22/2020
PROPOSED
Milne Point Unit
Well: MPU F-18
Last Completed: 3/5/2015
PTD: 196-100
TD =14,941’(MD) / TD = 7,530’(TVD)
20”
7” Short joint f/
14,196’ to 14,236’.
RA Tag @ 14,196’
Orig. KB Elev.: 40.65’/ GL Elev.: 12.40’ (N 22E)
7”
3
5
9-5/8 ”
1
2
PBTD =14,834’ (MD) / PBTD = 7,456’(TVD)
4
Fish-Centralizer
pushed to 14,522’KUP Sands
CASING DETAIL
Size Type Wt/ Grade/ Conn ID Top Btm
20" Conductor 91.1 / H-40 / N/A N/A Surface 112'
9-5/8" Surface 40 / L-80 / BTC 8.835 Surface 7,914’
7" Production 26 / L-80 / BTC 6.276 Surface 14,915’
TUBING DETAIL
4-1/2” Tubing 12.6 / L-80 / TXP 3.958 Surface ±14,324’
JEWELRY DETAIL
No Depth Item
1 ±2,300’ X-Nipple – 3.813 ID
2 ±14,232’ Packer
3 ±14,262’ X-Nipple – 3.813 ID
4 ±14,320’ Magnum Burst Disk 4,500psi
5 ±14,322’ WLEG – Bottom at ±14,324’
PERFORATION DETAIL
Kuparuk Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status
A3/A2 Sands 14,434’ 14,470’ 7,178’ 7,204’ 36’ 6/20/1996 Open
A1/ Sand 14,482’ 14,522’ 7,212’ 7,240’ 40’ 6/19/1996 Open
WELL INCLINATION DETAIL
KOP @ 600’
Max Hole Angle = 67 to 71 deg. f/ 3,700’ to 13,300’
Hole Angle thru perfs = 45 Deg. No DLS = 3 Deg. / 100’
TREE & WELLHEAD
Tree 2-9/16”5M FMC
Wellhead 11” 5M FMC
Tubing Hanger 2-7/8”WKM w/ 3” LH Acme Threads, 2.5” CIW H BPV Profile
GENERAL WELL INFO
API: 50-029-22681-00-00
Drilled and Cased by Nabors 22E - 6/16/1996
Perforated – 6/20/1996
ESP Completion by Polar 1– 7/16/1996
ESP RWO by Nabors 4ES – 7/8/2001
ESP RWO by Doyon 14 – 6/5/2004
ESP RWO by Nabors 3S – 7/17/2008
ESP RWO by Doyon 16 – 6/15/2012
ESP RWO by Nordic 3 – 4/13/2015
ESP RWO by ASR#1 – 3/5/2018
OPEN HOLE / CEMENT DETAIL
20” 250 sx Arcticset I(Approx.) in a 24” Hole
9-5/8” 1,600 sx PF ‘E’, 600 sx ‘G’, 150 sx PF ‘E’ in a 12.25” Hole
7” 220 sx Class “G” in a 8.5” Hole
STIMULATION DETAIL
Interval: 14,434’ to 14,470’ & 14,482’ to 14,522’. Frac’d w/
154,100lbs. of 16-20 Carbolite behind pipe.
_____________________________________________________________________________________
Revised By: JNL 1/18/2021
PROPOSED (Post Sundry
w/ whipstock
Milne Point Unit
Well: MPU F-18
Last Completed: TBD
PTD: 196-100
TD =14,941’(MD) / TD = 7,530’(TVD)
20”
7” Short joint f/
14,196’ to 14,236’.
RA Tag @ 14,196’
Orig. KB Elev.: 40.65’/ GL Elev.: 12.40’ (N 22E)
7”
3
5
9-5/8 ”
1
2
Top of
Whipstock
@14,432’
PBTD =14,834’ (MD) / PBTD = 7,456’(TVD)
4
Fish-Centralizer
pushed to 14,522’KUP Sands
CASING DETAIL
Size Type Wt/ Grade/ Conn ID Top Btm
20" Conductor 91.1 / H-40 / N/A N/A Surface 112'
9-5/8" Surface 40 / L-80 / BTC 8.835 Surface 7,914’
7" Production 26 / L-80 / BTC 6.276 Surface 14,915’
TUBING DETAIL
4-1/2” Tubing 12.6 / L-80 / TXP 3.958 Surface ±14,324’
JEWELRY DETAIL
No Depth Item
1 ±2,300’ X-Nipple – 3.813 ID
2 ±14,232’ Packer
3 ±14,262’ X-Nipple – 3.813 ID
4 ±14,320’ Magnum Burst Disk 4,500psi
5 ±14,322’ WLEG – Bottom at ±14,324’
PERFORATION DETAIL
Kuparuk Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status
A3/A2 Sands 14,434’ 14,470’ 7,178’ 7,204’ 36’ 6/20/1996 Open
A1/ Sand 14,482’ 14,522’ 7,212’ 7,240’ 40’ 6/19/1996 Open
WELL INCLINATION DETAIL
KOP @ 600’
Max Hole Angle = 67 to 71 deg. f/ 3,700’ to 13,300’
Hole Angle thru perfs = 45 Deg. No DLS = 3 Deg. / 100’
TREE & WELLHEAD
Tree 2-9/16”5M FMC
Wellhead 11” 5M FMC
Tubing Hanger 2-7/8”WKM w/ 3” LH Acme Threads, 2.5” CIW H BPV Profile
GENERAL WELL INFO
API: 50-029-22681-00-00
Drilled and Cased by Nabors 22E - 6/16/1996
Perforated – 6/20/1996
ESP Completion by Polar 1– 7/16/1996
ESP RWO by Nabors 4ES – 7/8/2001
ESP RWO by Doyon 14 – 6/5/2004
ESP RWO by Nabors 3S – 7/17/2008
ESP RWO by Doyon 16 – 6/15/2012
ESP RWO by Nordic 3 – 4/13/2015
ESP RWO by ASR#1 – 3/5/2018
OPEN HOLE / CEMENT DETAIL
24” 250 sx Arcticset I(Approx.)
12-1/4” 1,600 sx PF ‘E’, 600 sx ‘G’, 150 sx PF ‘E’
8-1/2” 220 sx Class ‘G’
STIMULATION DETAIL
Interval: 14,434’ to 14,470’ & 14,482’ to 14,522’. Frac’d w/
154,100lbs. of 16-20 Carbolite behind pipe.
_____________________________________________________________________________________
Revised By: JNL 1/18/2021
PROPOSED
Milne Point Unit
Well: MPU F-18 / L1 / L1-01
Last Completed: TBD
PTD: 196-100 / TBD / TBD
F-18L1
TD = 15,900’ (MD) / 7,132’ (TVD)
PBTD = 15,900’ (MD) / 7,132’ (TVD)
2-7/8” XO Solid to Slotted Liner @15,540’
Liner Top Billet @14,750’
2-7/8” XO Solid to Slotted Liner @15,680’
F-18L1-01
TD = 16,045’ (MD) / 7,090’ (TVD)
PBTD = 16,045’ (MD) / 7,090’ (TVD)
TD =14,941’(MD) / TD = 7,530’(TVD)
20”
7” Short joint f/
14,196’ to 14,236’.
RA Tag @ 14,196’
Orig. KB Elev.: 40.65’/ GL Elev.: 12.40’ (N 22E)
7”
3
5
9-5/8 ”
1
2
Top of
Whipstock
@14,432’
Top of 2-7/8”
Liner @14,300’
PBTD =14,834’ (MD) / PBTD = 7,456’(TVD)
4
Fish-Centralizer
pushed to 14,522’KUP Sands
CASING DETAIL
Size Type
Wt/ Grade/
Conn ID Top Btm
20" Conductor 91.1 / H-40 / N/A N/A Surface 112'
9-5/8" Surface 40 / L-80 / BTC 8.835 Surface 7,914’
7" Production 26 / L-80 / BTC 6.276 Surface 14,915’
L1: 2-7/8” Solid/Slotted Liner 6.5 / L-80 / STL 14,750’ 15,900’
L1-01: 2-7/8” Solid/Slotted Liner 6.5 / L-80 / STL 14,300’ 16,045’
TUBING DETAIL
4-1/2” Tubing 12.6 / L-80 / TXP 3.958 Surface ±14,324’
JEWELRY DETAIL
No Depth Item
1 ±2,300’ X-Nipple – 3.813 ID
2 ±14,232’ Packer
3 ±14,262’ X-Nipple – 3.813 ID
4 ±14,320’ Magnum Burst Disk 4,500psi
5 ±14,322’ WLEG – Bottom at ±14,324’
PERFORATION DETAIL
Kuparuk Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status
F-18: A3/A2 Sands 14,434’ 14,470’ 7,178’ 7,204’ 36’ 6/20/1996 Open
F-18: A1/ Sands 14,482’ 14,522’ 7,212’ 7,240’ 40’ 6/19/1996 Open
L1: Kup A
L1-01: Kup A
WELL INCLINATION DETAIL
KOP @ 600’
Max Hole Angle = 67 to 71 deg. f/ 3,700’ to 13,300’
Hole Angle thru perfs = 45 Deg. No DLS = 3 Deg. / 100’
TREE & WELLHEAD
Tree 2-9/16”5M FMC
Wellhead 11” 5M FMC
Tubing Hanger 2-7/8”WKM w/ 3” LH Acme Threads, 2.5” CIW H BPV Profile
GENERAL WELL INFO
API: 50-029-22681-00-00 / 60-00 / 61-00
Drilled and Cased by Nabors 22E - 6/16/1996
Perforated – 6/20/1996
ESP RWO by ASR#1 – 3/5/2018
RWO Tubing Swap: TBD
L1 & L1-01 Sidetrack: TBD
OPEN HOLE / CEMENT DETAIL
24” 250 sx Arcticset I(Approx.)
12-1/4” 1,600 sx PF ‘E’, 600 sx ‘G’, 150 sx PF ‘E’
8-1/2” 220 sx Class ‘G’
4-1/4” Uncemented Solid/Slotted Liner (MPU F-18L1 & L1-01)
STIMULATION DETAIL
Interval: 14,434’ to 14,470’ & 14,482’ to 14,522’. Frac’d w/
154,100lbs. of 16-20 Carbolite behind pipe.
18 January, 2021
Plan: MPU F-18L1-01 wp04
Milne Point
M Pt F Pad
MPF-18
MPU F-18L-01
Project:
Company:
Local Co-ordinate Reference:
TVD Reference:
Site:
Hilcorp Alaska, LLC
Milne Point
M Pt F Pad
Standard Proposal Report
Well:
Wellbore:
MPF-18
MPU F-18L-01
Survey Calculation Method:Minimum Curvature
F-18 Gyrodata @ 40.65usft
Design:MPU F-18L1-01 wp04
Database:NORTH US + CANADA
MD Reference:F-18 Gyrodata @ 40.65usft
North Reference:
Well MPF-18
True
Map System:
Geo Datum:
Project
Map Zone:
System Datum:US State Plane 1927 (Exact solution)
NAD 1927 (NADCON CONUS)
Milne Point, ACT, MILNE POINT
Alaska Zone 04
Mean Sea Level
Using Well Reference Point
Using geodetic scale factor
Site Position:
From:
Site
Latitude:
Longitude:
Position Uncertainty:
Northing:
Easting:
Grid Convergence:
M Pt F Pad, TR-13-10
usft
Map usft
usft
°0.25Slot Radius:"0
6,029,958.490
531,814.440
0.00
70° 29' 34.438 N
149° 44' 23.616 W
Well
Well Position
Longitude:
Latitude:
Easting:
Northing:
usft
+E/-W
+N/-S
Position Uncertainty
usft
usft
usftGround Level:
MPF-18, MPF-18
usft
usft
0.00
0.00
6,035,324.040
541,744.200
12.40Wellhead Elevation:usft0.00
70° 30' 26.728 N
149° 39' 30.474 W
Wellbore
Declination
(°)
Field Strength
(nT)
Sample Date Dip Angle
(°)
MPU F-18L-01
Model NameMagnetics
BGGM2020 12/23/2020 15.79 80.89 57,366.63141658
Phase:Version:
Audit Notes:
Design MPU F-18L1-01 wp04
PLAN
Vertical Section: Depth From (TVD)
(usft)
+N/-S
(usft)
Direction
(°)
+E/-W
(usft)
Tie On Depth:14,750.00
24.700.000.0028.25
Inclination
(°)
Azimuth
(°)
+E/-W
(usft)
Tool Face
(°)
+N/-S
(usft)
Measured
Depth
(usft)
Vertical
Depth
(usft)
Dogleg
Rate
(°/100usft)
Build
Rate
(°/100usft)
Turn
Rate
(°/100usft)
Plan Sections
TVD
System
usft
0.000.000.000.00-6,705.769,620.587,241.0346.9990.4714,750.00 7,200.38
88.0012.000.3912.00-6,535.649,722.897,238.0170.9891.2414,950.00 7,197.36
-90.00-12.00-0.0712.00-6,314.969,880.467,232.3837.9791.0415,225.00 7,191.73
90.0012.00-0.0412.00-6,162.9610,008.137,228.8561.9790.9515,425.00 7,188.20
-72.00-11.743.1312.00-5,910.8710,354.387,161.639.15105.0515,875.00 7,120.98
-10.00-2.5011.7912.00-5,891.6710,506.327,089.934.91125.0916,045.00 7,049.28
1/18/2021 11:35:59PM COMPASS 5000.15 Build 91E Page 2
Project:
Company:
Local Co-ordinate Reference:
TVD Reference:
Site:
Hilcorp Alaska, LLC
Milne Point
M Pt F Pad
Standard Proposal Report
Well:
Wellbore:
MPF-18
MPU F-18L-01
Survey Calculation Method:Minimum Curvature
F-18 Gyrodata @ 40.65usft
Design:MPU F-18L1-01 wp04
Database:NORTH US + CANADA
MD Reference:F-18 Gyrodata @ 40.65usft
North Reference:
Well MPF-18
True
Measured
Depth
(usft)
Inclination
(°)
Azimuth
(°)
+E/-W
(usft)
Map
Northing
(usft)
Map
Easting
(usft)
+N/-S
(usft)
Planned Survey
Vertical
Depth
(usft)
TVDss
usft
DLS
-12.40
Vert Section
28.25 0.00 28.25 0.00 0.000.00 541,744.2006,035,324.040-12.40 0.000 0.00
110.00 0.32 110.00 -0.09 0.21114.35 541,744.4086,035,323.94769.35 0.391 0.00
210.00 0.34 210.00 -0.46 0.62148.15 541,744.8216,035,323.582169.35 0.193 -0.16
310.00 0.37 310.00 -0.86 1.06117.58 541,745.2666,035,323.183269.35 0.189 -0.34
410.00 0.18 409.99 -1.12 1.47130.89 541,745.6736,035,322.933369.34 0.199 -0.40
510.00 0.04 509.99 -1.25 1.58192.88 541,745.7846,035,322.797469.34 0.165 -0.48
610.00 1.49 609.98 -0.38 0.64314.03 541,744.8376,035,323.661569.33 1.511 -0.08
660.00 2.54 659.95 0.83 -0.63313.67 541,743.5626,035,324.871619.30 2.100 0.49
710.00 3.33 709.89 2.67 -2.41317.69 541,741.7736,035,326.700669.24 1.632 1.42
760.00 3.89 759.79 4.99 -4.54317.12 541,739.6286,035,329.004719.14 1.122 2.63
810.00 4.42 809.66 7.68 -6.97318.78 541,737.1906,035,331.682769.01 1.087 4.07
860.00 4.86 859.49 10.77 -9.58320.84 541,734.5656,035,334.759818.84 0.941 5.79
910.00 6.48 909.24 14.57 -12.74319.76 541,731.3846,035,338.537868.59 3.247 7.92
960.00 8.27 958.83 19.43 -16.93318.71 541,727.1626,035,343.369918.18 3.590 10.57
1,010.00 9.56 1,008.22 25.19 -22.10317.59 541,721.9566,035,349.107967.57 2.603 13.65
1,060.00 10.66 1,057.45 31.56 -28.15315.47 541,715.8786,035,355.4351,016.80 2.322 16.91
1,110.00 12.08 1,106.46 38.57 -35.08315.22 541,708.9106,035,362.4061,065.81 2.842 20.38
1,160.00 12.96 1,155.28 46.24 -42.73314.91 541,701.2126,035,370.0341,114.63 1.765 24.15
1,210.00 13.62 1,203.94 54.42 -50.80315.87 541,693.0976,035,378.1721,163.29 1.392 28.22
1,260.00 14.56 1,252.43 63.17 -59.27315.99 541,684.5836,035,386.8691,211.78 1.881 32.62
1,310.00 16.49 1,300.60 72.85 -68.51316.66 541,675.2926,035,396.4981,259.95 3.877 37.56
1,360.00 17.89 1,348.37 83.72 -78.51318.03 541,665.2256,035,407.3121,307.72 2.915 43.25
1,410.00 19.84 1,395.68 95.67 -89.40317.33 541,654.2726,035,419.1991,355.03 3.926 49.56
1,460.00 20.21 1,442.66 108.39 -100.86318.60 541,642.7396,035,431.8511,402.01 1.142 56.33
1,510.00 20.57 1,489.53 121.58 -112.24319.81 541,631.2866,035,444.9741,448.88 1.109 63.55
1,560.00 21.75 1,536.15 135.23 -124.05318.52 541,619.4066,035,458.5571,495.50 2.537 71.02
1,610.00 23.47 1,582.31 149.83 -136.54320.32 541,606.8316,035,473.0891,541.66 3.708 79.07
1,660.00 24.95 1,627.91 165.72 -149.50321.27 541,593.7876,035,488.9051,587.26 3.061 88.09
1,710.00 26.40 1,672.97 182.63 -163.04321.32 541,580.1486,035,505.7331,632.32 2.900 97.79
1,760.00 27.69 1,717.51 200.60 -176.96323.14 541,566.1326,035,523.6261,676.86 3.065 108.30
1,810.00 28.60 1,761.59 219.60 -190.94324.13 541,552.0456,035,542.5381,720.94 2.046 119.72
1,860.00 29.06 1,805.40 239.18 -205.01324.50 541,537.8736,035,562.0411,764.75 0.987 131.63
1,910.00 29.43 1,849.02 258.99 -219.29323.92 541,523.4776,035,581.7721,808.37 0.932 143.66
1,960.00 30.88 1,892.26 279.24 -234.15323.55 541,508.5076,035,601.9361,851.61 2.924 155.85
2,010.00 31.89 1,934.94 300.18 -249.63323.48 541,492.9086,035,622.7831,894.29 2.021 168.40
2,060.00 33.90 1,976.92 322.33 -265.33325.84 541,477.0946,035,644.8471,936.27 4.767 181.97
2,110.00 35.41 2,018.05 345.82 -281.35325.53 541,460.9356,035,668.2361,977.40 3.041 196.61
2,160.00 36.96 2,058.41 369.91 -298.40323.93 541,443.7526,035,692.2322,017.76 3.630 211.37
2,210.00 37.74 2,098.15 394.52 -316.14324.52 541,425.8836,035,716.7402,057.50 1.716 226.32
2,260.00 39.01 2,137.35 419.95 -333.94325.48 541,407.9426,035,742.0652,096.70 2.806 241.99
2,310.00 39.78 2,175.99 446.18 -351.79326.05 541,389.9466,035,768.1972,135.34 1.701 258.36
2,360.00 40.73 2,214.15 473.02 -369.79326.24 541,371.7986,035,794.9242,173.50 1.916 275.22
2,410.00 41.54 2,251.81 500.45 -387.93326.81 541,353.5056,035,822.2552,211.16 1.785 292.56
2,460.00 42.62 2,288.92 528.56 -406.17327.22 541,335.1086,035,850.2572,248.27 2.229 310.48
2,510.00 43.71 2,325.39 557.20 -424.87326.48 541,316.2446,035,878.7842,284.74 2.404 328.68
1/18/2021 11:35:59PM COMPASS 5000.15 Build 91E Page 3
Project:
Company:
Local Co-ordinate Reference:
TVD Reference:
Site:
Hilcorp Alaska, LLC
Milne Point
M Pt F Pad
Standard Proposal Report
Well:
Wellbore:
MPF-18
MPU F-18L-01
Survey Calculation Method:Minimum Curvature
F-18 Gyrodata @ 40.65usft
Design:MPU F-18L1-01 wp04
Database:NORTH US + CANADA
MD Reference:F-18 Gyrodata @ 40.65usft
North Reference:
Well MPF-18
True
Measured
Depth
(usft)
Inclination
(°)
Azimuth
(°)
+E/-W
(usft)
Map
Northing
(usft)
Map
Easting
(usft)
+N/-S
(usft)
Planned Survey
Vertical
Depth
(usft)
TVDss
usft
DLS
2,320.58
Vert Section
2,560.00 44.69 2,361.23 586.31 -444.04326.80 541,296.9156,035,907.7882,320.58 2.010 347.12
2,610.00 45.73 2,396.46 616.20 -463.16327.97 541,277.6276,035,937.5672,355.81 2.662 366.28
2,660.00 46.35 2,431.17 646.51 -482.57326.76 541,258.0486,035,967.7612,390.52 2.138 385.70
2,710.00 46.91 2,465.50 676.86 -502.57326.50 541,237.8876,035,997.9992,424.85 1.182 404.93
2,760.00 47.14 2,499.59 707.56 -522.45327.64 541,217.8326,036,028.5882,458.94 1.730 424.51
2,810.00 48.63 2,533.12 738.90 -542.30327.67 541,197.8156,036,059.8082,492.47 2.980 444.69
2,860.00 49.73 2,565.80 770.61 -562.93326.24 541,177.0046,036,091.4022,525.15 3.086 464.88
2,910.00 51.47 2,597.54 802.01 -585.42322.59 541,154.3426,036,122.6732,556.89 6.627 484.01
2,960.00 52.73 2,628.26 833.55 -609.12323.55 541,130.4656,036,154.0762,587.61 2.940 502.76
3,000.00 54.06 2,652.11 859.69 -627.76325.45 541,111.6796,036,180.1102,611.46 5.059 518.72
3,100.00 55.80 2,709.56 926.76 -674.66324.63 541,064.4076,036,246.9082,668.91 1.865 560.05
3,150.00 56.49 2,737.42 960.52 -698.84324.14 541,040.0406,036,280.5232,696.77 1.602 580.62
3,200.00 58.06 2,764.45 994.51 -723.61323.71 541,015.0836,036,314.3762,723.80 3.222 601.15
3,250.00 59.18 2,790.48 1,028.87 -748.95323.48 540,989.5596,036,348.5852,749.83 2.274 621.78
3,300.00 60.52 2,815.60 1,063.55 -774.76323.21 540,963.5556,036,383.1202,774.95 2.720 642.50
3,350.00 61.68 2,839.76 1,098.59 -801.00323.13 540,937.1226,036,418.0052,799.11 2.324 663.37
3,400.00 62.91 2,863.01 1,133.96 -827.62322.94 540,910.3076,036,453.2202,822.36 2.483 684.38
3,450.00 63.81 2,885.42 1,169.55 -854.64322.64 540,883.0836,036,488.6572,844.77 1.878 705.42
3,500.00 65.07 2,907.00 1,205.32 -882.13322.27 540,855.3986,036,524.2622,866.35 2.607 726.43
3,550.00 65.76 2,927.80 1,241.21 -910.03322.02 540,827.2986,036,560.0002,887.15 1.453 747.38
3,600.00 66.02 2,948.22 1,277.14 -938.18321.82 540,798.9516,036,595.7612,907.57 0.635 768.26
3,650.00 65.84 2,968.62 1,313.00 -966.43321.71 540,770.5006,036,631.4582,927.97 0.412 789.03
3,700.00 65.95 2,989.04 1,348.82 -994.71321.71 540,742.0216,036,667.1172,948.39 0.220 809.76
3,750.00 67.25 3,008.89 1,384.79 -1,023.20321.53 540,713.3326,036,702.9232,968.24 2.621 830.53
3,800.00 68.29 3,027.81 1,420.97 -1,052.07321.30 540,684.2666,036,738.9352,987.16 2.123 851.34
3,850.00 68.17 3,046.35 1,457.20 -1,081.11321.27 540,655.0246,036,774.9993,005.70 0.246 872.12
3,900.00 67.85 3,065.08 1,493.33 -1,110.16321.14 540,625.7776,036,810.9663,024.43 0.684 892.81
3,950.00 67.64 3,084.01 1,529.41 -1,139.14321.30 540,596.5936,036,846.8743,043.36 0.514 913.47
4,000.00 67.52 3,103.08 1,565.51 -1,168.00321.43 540,567.5366,036,882.8123,062.43 0.340 934.21
4,050.00 68.33 3,121.87 1,601.78 -1,196.83321.61 540,538.5046,036,918.9183,081.22 1.654 955.12
4,100.00 68.19 3,140.39 1,638.19 -1,225.67321.61 540,509.4616,036,955.1543,099.74 0.280 976.14
4,150.00 68.22 3,158.96 1,674.61 -1,254.46321.75 540,480.4736,036,991.4123,118.31 0.267 997.20
4,200.00 68.52 3,177.39 1,711.15 -1,283.19321.89 540,451.5416,037,027.7823,136.74 0.654 1,018.39
4,250.00 69.24 3,195.40 1,747.87 -1,311.95321.97 540,422.5786,037,064.3353,154.75 1.448 1,039.73
4,300.00 69.01 3,213.22 1,784.68 -1,340.72322.01 540,393.6056,037,100.9793,172.57 0.466 1,061.15
4,350.00 68.85 3,231.20 1,821.45 -1,369.43322.02 540,364.6876,037,137.5873,190.55 0.321 1,082.56
4,400.00 68.98 3,249.18 1,858.26 -1,398.10322.17 540,335.8226,037,174.2323,208.53 0.382 1,104.03
4,450.00 68.91 3,267.15 1,895.14 -1,426.68322.28 540,307.0356,037,210.9503,226.50 0.249 1,125.59
4,500.00 69.06 3,285.08 1,932.20 -1,455.05322.85 540,278.4596,037,247.8473,244.43 1.106 1,147.40
4,550.00 69.42 3,302.80 1,969.58 -1,483.14323.30 540,250.1646,037,285.0613,262.15 1.108 1,169.62
4,600.00 69.26 3,320.44 2,007.03 -1,511.18323.06 540,221.9196,037,322.3513,279.79 0.551 1,191.93
4,650.00 69.10 3,338.21 2,044.34 -1,539.33322.86 540,193.5606,037,359.4943,297.56 0.492 1,214.06
4,700.00 68.96 3,356.11 2,081.52 -1,567.56322.74 540,165.1276,037,396.5193,315.46 0.359 1,236.05
4,750.00 68.85 3,374.10 2,118.68 -1,595.76322.87 540,136.7206,037,433.5173,333.45 0.327 1,258.03
4,800.00 68.95 3,392.10 2,156.15 -1,623.55324.00 540,108.7246,037,470.8223,351.45 2.118 1,280.45
1/18/2021 11:35:59PM COMPASS 5000.15 Build 91E Page 4
Project:
Company:
Local Co-ordinate Reference:
TVD Reference:
Site:
Hilcorp Alaska, LLC
Milne Point
M Pt F Pad
Standard Proposal Report
Well:
Wellbore:
MPF-18
MPU F-18L-01
Survey Calculation Method:Minimum Curvature
F-18 Gyrodata @ 40.65usft
Design:MPU F-18L1-01 wp04
Database:NORTH US + CANADA
MD Reference:F-18 Gyrodata @ 40.65usft
North Reference:
Well MPF-18
True
Measured
Depth
(usft)
Inclination
(°)
Azimuth
(°)
+E/-W
(usft)
Map
Northing
(usft)
Map
Easting
(usft)
+N/-S
(usft)
Planned Survey
Vertical
Depth
(usft)
TVDss
usft
DLS
3,369.51
Vert Section
4,850.00 68.70 3,410.16 2,193.95 -1,650.85324.32 540,081.2156,037,508.4603,369.51 0.779 1,303.38
4,900.00 68.21 3,428.53 2,231.65 -1,678.08324.00 540,053.7766,037,546.0043,387.88 1.147 1,326.26
4,950.00 68.08 3,447.14 2,269.15 -1,705.40323.85 540,026.2436,037,583.3543,406.49 0.381 1,348.91
5,000.00 67.86 3,465.89 2,306.57 -1,732.76323.81 539,998.6816,037,620.6123,425.24 0.446 1,371.48
5,050.00 67.62 3,484.83 2,343.92 -1,760.08323.81 539,971.1516,037,657.8003,444.18 0.480 1,393.99
5,100.00 67.51 3,503.92 2,381.20 -1,787.38323.76 539,943.6406,037,694.9303,463.27 0.239 1,416.45
5,150.00 67.32 3,523.12 2,418.57 -1,814.49324.33 539,916.3276,037,732.1433,482.47 1.119 1,439.08
5,200.00 67.77 3,542.22 2,456.29 -1,841.19325.09 539,889.4236,037,769.7063,501.57 1.668 1,462.19
5,250.00 67.41 3,561.28 2,494.19 -1,867.64325.08 539,862.7566,037,807.4573,520.63 0.720 1,485.57
5,300.00 67.05 3,580.63 2,531.98 -1,894.06325.01 539,836.1336,037,845.0903,539.98 0.731 1,508.86
5,350.00 67.78 3,599.83 2,569.79 -1,920.54324.98 539,809.4416,037,882.7513,559.18 1.461 1,532.15
5,400.00 67.97 3,618.66 2,607.76 -1,947.07325.12 539,782.6976,037,920.5633,578.01 0.460 1,555.55
5,450.00 67.95 3,637.43 2,645.77 -1,973.60325.06 539,755.9636,037,958.4153,596.78 0.118 1,579.00
5,500.00 67.77 3,656.27 2,683.74 -2,000.11325.08 539,729.2356,037,996.2323,615.62 0.362 1,602.41
5,550.00 67.65 3,675.23 2,721.65 -2,026.62325.01 539,702.5196,038,033.9973,634.58 0.273 1,625.79
5,600.00 67.80 3,694.19 2,759.57 -2,053.13325.07 539,675.7966,038,071.7633,653.54 0.320 1,649.16
5,650.00 68.95 3,712.61 2,797.67 -2,079.76325.03 539,648.9596,038,109.7073,671.96 2.301 1,672.64
5,700.00 68.85 3,730.61 2,835.89 -2,106.50325.00 539,622.0016,038,147.7713,689.96 0.208 1,696.19
5,750.00 68.31 3,748.87 2,874.01 -2,133.22324.96 539,595.0796,038,185.7353,708.22 1.083 1,719.66
5,800.00 67.94 3,767.50 2,911.98 -2,159.88324.89 539,568.2056,038,223.5553,726.85 0.751 1,743.02
5,850.00 67.17 3,786.59 2,949.80 -2,186.44324.94 539,541.4336,038,261.2173,745.94 1.543 1,766.27
5,900.00 66.44 3,806.29 2,987.61 -2,212.56325.81 539,515.1106,038,298.8833,765.64 2.166 1,789.72
5,950.00 67.10 3,826.01 3,025.74 -2,238.19326.35 539,489.2596,038,336.8623,785.36 1.651 1,813.64
6,000.00 68.02 3,845.09 3,064.23 -2,263.78326.41 539,463.4586,038,375.1973,804.44 1.843 1,837.91
6,050.00 68.88 3,863.46 3,102.99 -2,289.47326.52 539,437.5526,038,413.8123,822.81 1.732 1,862.40
6,100.00 68.13 3,881.78 3,141.80 -2,315.13326.55 539,411.6846,038,452.4733,841.13 1.501 1,886.93
6,150.00 67.33 3,900.73 3,180.42 -2,340.61326.61 539,385.9856,038,490.9453,860.08 1.604 1,911.37
6,200.00 67.29 3,920.01 3,218.99 -2,365.92326.84 539,360.4626,038,529.3653,879.36 0.432 1,935.83
6,250.00 67.46 3,939.25 3,257.60 -2,391.19326.76 539,334.9766,038,567.8373,898.60 0.371 1,960.36
6,300.00 68.44 3,958.02 3,296.32 -2,416.66326.56 539,309.2926,038,606.4053,917.37 1.995 1,984.89
6,350.00 69.18 3,976.09 3,335.11 -2,442.52326.08 539,283.2236,038,645.0493,935.44 1.730 2,009.33
6,400.00 70.17 3,993.46 3,373.96 -2,468.77325.80 539,256.7496,038,683.7403,952.81 2.048 2,033.65
6,450.00 70.63 4,010.23 3,412.89 -2,495.28325.72 539,230.0306,038,722.5263,969.58 0.932 2,057.95
6,500.00 70.35 4,026.93 3,451.82 -2,521.85325.65 539,203.2466,038,761.2983,986.28 0.575 2,082.21
6,550.00 70.04 4,043.87 3,490.64 -2,548.42325.56 539,176.4576,038,799.9624,003.22 0.643 2,106.37
6,600.00 70.12 4,060.91 3,529.42 -2,574.98325.63 539,149.6806,038,838.5944,020.26 0.207 2,130.51
6,650.00 69.91 4,078.00 3,568.25 -2,601.44325.83 539,123.0066,038,877.2724,037.35 0.564 2,154.73
6,700.00 69.87 4,095.19 3,607.12 -2,627.79325.89 539,096.4406,038,915.9804,054.54 0.138 2,179.03
6,750.00 69.75 4,112.44 3,645.86 -2,654.27325.40 539,069.7446,038,954.5684,071.79 0.951 2,203.16
6,800.00 70.20 4,129.57 3,684.20 -2,681.41324.03 539,042.3956,038,992.7564,088.92 2.727 2,226.66
6,850.00 70.05 4,146.56 3,722.19 -2,709.12323.74 539,014.4706,039,030.5824,105.91 0.623 2,249.58
6,900.00 69.79 4,163.73 3,760.04 -2,736.92323.68 538,986.4666,039,068.2744,123.08 0.532 2,272.36
6,950.00 69.74 4,181.02 3,797.81 -2,764.75323.55 538,958.4276,039,105.8814,140.37 0.264 2,295.04
7,000.00 69.49 4,198.44 3,835.50 -2,792.60323.53 538,930.3666,039,143.4154,157.79 0.501 2,317.65
7,050.00 69.41 4,215.99 3,873.17 -2,820.40323.62 538,902.3586,039,180.9274,175.34 0.232 2,340.26
1/18/2021 11:35:59PM COMPASS 5000.15 Build 91E Page 5
Project:
Company:
Local Co-ordinate Reference:
TVD Reference:
Site:
Hilcorp Alaska, LLC
Milne Point
M Pt F Pad
Standard Proposal Report
Well:
Wellbore:
MPF-18
MPU F-18L-01
Survey Calculation Method:Minimum Curvature
F-18 Gyrodata @ 40.65usft
Design:MPU F-18L1-01 wp04
Database:NORTH US + CANADA
MD Reference:F-18 Gyrodata @ 40.65usft
North Reference:
Well MPF-18
True
Measured
Depth
(usft)
Inclination
(°)
Azimuth
(°)
+E/-W
(usft)
Map
Northing
(usft)
Map
Easting
(usft)
+N/-S
(usft)
Planned Survey
Vertical
Depth
(usft)
TVDss
usft
DLS
4,193.02
Vert Section
7,100.00 69.19 4,233.67 3,910.82 -2,848.15323.59 538,874.3986,039,218.4154,193.02 0.444 2,362.87
7,150.00 68.80 4,251.59 3,948.41 -2,875.83323.69 538,846.5176,039,255.8454,210.94 0.802 2,385.45
7,200.00 68.26 4,269.89 3,985.88 -2,903.42323.56 538,818.7146,039,293.1504,229.24 1.107 2,407.96
7,250.00 68.04 4,288.50 4,023.20 -2,931.00323.51 538,790.9266,039,330.3134,247.85 0.450 2,430.34
7,300.00 67.87 4,307.26 4,060.47 -2,958.55323.55 538,763.1726,039,367.4234,266.61 0.348 2,452.69
7,350.00 69.14 4,325.59 4,097.94 -2,986.11323.78 538,735.4016,039,404.7404,284.94 2.576 2,475.22
7,400.00 69.15 4,343.39 4,135.69 -3,013.66323.97 538,707.6466,039,442.3224,302.74 0.356 2,497.99
7,450.00 69.05 4,361.22 4,173.46 -3,041.14323.97 538,679.9616,039,479.9384,320.57 0.200 2,520.83
7,500.00 68.63 4,379.27 4,211.19 -3,068.53324.06 538,652.3546,039,517.5104,338.62 0.857 2,543.66
7,550.00 68.16 4,397.68 4,248.84 -3,095.81324.09 538,624.8716,039,554.9974,357.03 0.942 2,566.47
7,600.00 67.89 4,416.39 4,286.37 -3,123.03324.01 538,597.4426,039,592.3764,375.74 0.560 2,589.19
7,650.00 67.73 4,435.28 4,323.81 -3,150.26323.92 538,569.9996,039,629.6574,394.63 0.361 2,611.82
7,700.00 67.99 4,454.12 4,361.28 -3,177.49324.07 538,542.5666,039,666.9654,413.47 0.590 2,634.49
7,750.00 69.21 4,472.36 4,399.00 -3,204.77324.18 538,515.0776,039,704.5294,431.71 2.449 2,657.36
7,800.00 69.27 4,490.08 4,436.90 -3,232.14324.16 538,487.4996,039,742.2774,449.43 0.126 2,680.36
7,850.00 70.08 4,507.45 4,474.92 -3,259.58324.21 538,459.8526,039,780.1394,466.80 1.623 2,703.43
7,900.00 69.91 4,524.56 4,513.03 -3,287.06324.20 538,432.1616,039,818.0894,483.91 0.341 2,726.57
7,914.00 69.73 4,529.39 4,523.69 -3,294.74324.26 538,424.4216,039,828.7074,488.74 1.351 2,733.05
9 5/8"
7,950.00 69.27 4,541.99 4,551.09 -3,314.39324.43 538,404.6156,039,855.9934,501.34 1.351 2,749.73
8,000.00 69.26 4,559.70 4,589.13 -3,341.59324.43 538,377.2036,039,893.8724,519.05 0.020 2,772.92
8,050.00 68.71 4,577.63 4,627.05 -3,368.81324.24 538,349.7806,039,931.6344,536.98 1.156 2,796.00
8,100.00 68.42 4,595.90 4,664.76 -3,396.09323.99 538,322.2916,039,969.1854,555.25 0.744 2,818.86
8,150.00 68.45 4,614.28 4,702.34 -3,423.47323.84 538,294.6956,040,006.6054,573.63 0.285 2,841.55
8,200.00 68.08 4,632.79 4,739.74 -3,451.01323.43 538,266.9496,040,043.8474,592.14 1.062 2,864.03
8,250.00 68.86 4,651.14 4,777.01 -3,478.83323.11 538,238.9276,040,080.9624,610.49 1.670 2,886.27
8,300.00 68.99 4,669.12 4,814.25 -3,506.94322.79 538,210.6116,040,118.0364,628.47 0.651 2,908.35
8,350.00 68.61 4,687.20 4,851.30 -3,535.23322.48 538,182.1156,040,154.9234,646.55 0.955 2,930.19
8,400.00 68.25 4,705.58 4,888.16 -3,563.57322.42 538,153.5726,040,191.6254,664.93 0.729 2,951.84
8,450.00 68.47 4,724.02 4,925.30 -3,591.52323.64 538,125.4186,040,228.5954,683.37 2.310 2,973.89
8,500.00 68.45 4,742.38 4,962.80 -3,619.02323.85 538,097.7066,040,265.9404,701.73 0.393 2,996.47
8,550.00 69.17 4,760.45 5,000.62 -3,646.28324.59 538,070.2406,040,303.6034,719.80 1.994 3,019.44
8,600.00 68.98 4,778.31 5,038.65 -3,673.39324.43 538,042.9166,040,341.4724,737.66 0.483 3,042.66
8,650.00 68.54 4,796.43 5,076.48 -3,700.60324.12 538,015.4956,040,379.1494,755.78 1.053 3,065.66
8,700.00 68.06 4,814.91 5,114.07 -3,727.90323.92 537,987.9946,040,416.5854,774.26 1.029 3,088.41
8,750.00 67.52 4,833.81 5,151.43 -3,755.23323.69 537,960.4526,040,453.7844,793.16 1.161 3,110.93
8,800.00 68.14 4,852.68 5,188.82 -3,782.54324.01 537,932.9316,040,491.0154,812.03 1.374 3,133.48
8,850.00 68.71 4,871.07 5,226.50 -3,809.79324.25 537,905.4786,040,528.5364,830.42 1.224 3,156.33
8,900.00 68.55 4,889.29 5,264.28 -3,837.00324.24 537,878.0616,040,566.1654,848.64 0.321 3,179.29
8,950.00 68.89 4,907.43 5,302.19 -3,864.09324.65 537,850.7606,040,603.9134,866.78 1.023 3,202.41
9,000.00 68.64 4,925.54 5,340.20 -3,891.05324.65 537,823.5856,040,641.7704,884.89 0.500 3,225.67
9,050.00 68.42 4,943.84 5,378.14 -3,917.99324.60 537,796.4376,040,679.5544,903.19 0.450 3,248.89
9,100.00 69.16 4,961.93 5,416.31 -3,944.74325.36 537,769.4776,040,717.5734,921.28 2.049 3,272.39
9,150.00 69.15 4,979.72 5,454.87 -3,971.13325.85 537,742.8686,040,755.9784,939.07 0.916 3,296.39
9,200.00 69.92 4,997.21 5,493.83 -3,997.15326.67 537,716.6346,040,794.7814,956.56 2.175 3,320.91
1/18/2021 11:35:59PM COMPASS 5000.15 Build 91E Page 6
Project:
Company:
Local Co-ordinate Reference:
TVD Reference:
Site:
Hilcorp Alaska, LLC
Milne Point
M Pt F Pad
Standard Proposal Report
Well:
Wellbore:
MPF-18
MPU F-18L-01
Survey Calculation Method:Minimum Curvature
F-18 Gyrodata @ 40.65usft
Design:MPU F-18L1-01 wp04
Database:NORTH US + CANADA
MD Reference:F-18 Gyrodata @ 40.65usft
North Reference:
Well MPF-18
True
Measured
Depth
(usft)
Inclination
(°)
Azimuth
(°)
+E/-W
(usft)
Map
Northing
(usft)
Map
Easting
(usft)
+N/-S
(usft)
Planned Survey
Vertical
Depth
(usft)
TVDss
usft
DLS
4,973.76
Vert Section
9,250.00 69.83 5,014.41 5,533.09 -4,022.89326.84 537,690.6796,040,833.8964,973.76 0.366 3,345.82
9,300.00 69.45 5,031.81 5,572.32 -4,048.55326.78 537,664.8016,040,872.9764,991.16 0.768 3,370.74
9,350.00 69.15 5,049.48 5,611.41 -4,074.24326.60 537,638.8996,040,911.9155,008.83 0.688 3,395.52
9,400.00 68.74 5,067.44 5,650.34 -4,099.96326.49 537,612.9596,040,950.6975,026.79 0.845 3,420.14
9,450.00 68.50 5,085.67 5,689.13 -4,125.70326.37 537,586.9996,040,989.3425,045.02 0.529 3,444.63
9,500.00 68.03 5,104.19 5,727.81 -4,151.41326.41 537,561.0756,041,027.8735,063.54 0.943 3,469.02
9,550.00 68.20 5,122.82 5,766.41 -4,177.15326.20 537,535.1226,041,066.3265,082.17 0.517 3,493.34
9,600.00 69.12 5,141.02 5,805.08 -4,203.11326.06 537,508.9536,041,104.8455,100.37 1.858 3,517.62
9,650.00 69.49 5,158.69 5,843.88 -4,229.23326.03 537,482.6136,041,143.4915,118.04 0.742 3,541.95
9,700.00 70.01 5,175.99 5,882.76 -4,255.48325.93 537,456.1526,041,182.2205,135.34 1.057 3,566.31
9,750.00 69.65 5,193.23 5,921.61 -4,281.81325.82 537,429.6076,041,220.9205,152.58 0.749 3,590.61
9,800.00 69.38 5,210.73 5,960.31 -4,308.19325.62 537,403.0126,041,259.4695,170.08 0.657 3,614.74
9,850.00 68.97 5,228.51 5,998.87 -4,334.59325.58 537,376.3956,041,297.8775,187.86 0.823 3,638.74
9,900.00 68.41 5,246.68 6,037.28 -4,360.95325.51 537,349.8296,041,336.1345,206.03 1.128 3,662.63
9,950.00 69.22 5,264.75 6,075.70 -4,387.36325.48 537,323.2066,041,374.4005,224.10 1.621 3,686.49
10,000.00 69.16 5,282.51 6,114.22 -4,413.83325.52 537,296.5206,041,412.7655,241.86 0.141 3,710.43
10,050.00 68.82 5,300.44 6,152.70 -4,440.25325.54 537,269.8896,041,451.0935,259.79 0.681 3,734.35
10,100.00 68.36 5,318.69 6,191.06 -4,466.62325.43 537,243.3016,041,489.2965,278.04 0.943 3,758.17
10,150.00 68.15 5,337.21 6,229.33 -4,492.93325.57 537,216.7846,041,527.4185,296.56 0.494 3,781.95
10,200.00 68.31 5,355.76 6,267.60 -4,519.22325.45 537,190.2786,041,565.5385,315.11 0.390 3,805.74
10,250.00 69.38 5,373.80 6,306.08 -4,545.56325.76 537,163.7246,041,603.8635,333.15 2.217 3,829.69
10,300.00 69.37 5,391.41 6,344.76 -4,571.89325.75 537,137.1776,041,642.3935,350.76 0.027 3,853.83
10,350.00 68.92 5,409.21 6,383.32 -4,598.28325.47 537,110.5726,041,680.7985,368.56 1.041 3,877.83
10,400.00 69.27 5,427.05 6,421.75 -4,624.83325.27 537,083.8166,041,719.0785,386.40 0.793 3,901.65
10,450.00 69.88 5,444.50 6,460.28 -4,651.49325.36 537,056.9386,041,757.4535,403.85 1.232 3,925.52
10,500.00 69.50 5,461.86 6,498.84 -4,678.18325.25 537,030.0346,041,795.8535,421.21 0.788 3,949.39
10,550.00 69.17 5,479.50 6,537.25 -4,704.88325.15 537,003.1226,041,834.1145,438.85 0.686 3,973.13
10,600.00 68.79 5,497.44 6,575.57 -4,731.54325.20 536,976.2566,041,872.2745,456.79 0.766 3,996.80
10,650.00 68.47 5,515.66 6,613.84 -4,758.05325.37 536,949.5276,041,910.3945,475.01 0.714 4,020.50
10,700.00 69.37 5,533.64 6,652.40 -4,784.32326.10 536,923.0476,041,948.7995,492.99 2.257 4,044.55
10,750.00 69.77 5,551.09 6,691.36 -4,810.35326.40 536,896.8006,041,987.6075,510.44 0.978 4,069.07
10,800.00 69.50 5,568.49 6,730.38 -4,836.32326.32 536,870.6176,042,026.4815,527.84 0.560 4,093.67
10,850.00 69.22 5,586.12 6,769.34 -4,862.24326.40 536,844.4806,042,065.2865,545.47 0.580 4,118.23
10,900.00 70.22 5,603.45 6,808.51 -4,888.03326.88 536,818.4736,042,104.3095,562.80 2.193 4,143.04
10,950.00 70.42 5,620.29 6,847.98 -4,913.69327.05 536,792.5896,042,143.6295,579.64 0.512 4,168.17
11,000.00 70.17 5,637.15 6,887.49 -4,939.28327.10 536,766.7846,042,182.9925,596.50 0.509 4,193.38
11,050.00 69.93 5,654.21 6,926.93 -4,964.84327.00 536,741.0026,042,222.2835,613.56 0.516 4,218.53
11,100.00 71.15 5,670.86 6,966.47 -4,990.51327.02 536,715.1146,042,261.6765,630.21 2.440 4,243.72
11,150.00 71.04 5,687.06 7,006.15 -5,016.25327.04 536,689.1526,042,301.2125,646.41 0.223 4,269.02
11,200.00 70.84 5,703.39 7,045.79 -5,041.98326.98 536,663.2006,042,340.7025,662.74 0.416 4,294.28
11,250.00 70.35 5,720.00 7,085.29 -5,067.75326.79 536,637.2176,042,380.0525,679.35 1.043 4,319.40
11,300.00 70.98 5,736.56 7,124.88 -5,093.42327.29 536,611.3306,042,419.4905,695.91 1.574 4,344.64
11,350.00 71.38 5,752.69 7,164.77 -5,118.88327.61 536,585.6456,042,459.2355,712.04 1.003 4,370.24
11,400.00 71.24 5,768.71 7,204.77 -5,144.25327.61 536,560.0526,042,499.0835,728.06 0.280 4,395.98
11,450.00 70.87 5,784.94 7,244.71 -5,169.58327.63 536,534.5046,042,538.8745,744.29 0.741 4,421.68
1/18/2021 11:35:59PM COMPASS 5000.15 Build 91E Page 7
Project:
Company:
Local Co-ordinate Reference:
TVD Reference:
Site:
Hilcorp Alaska, LLC
Milne Point
M Pt F Pad
Standard Proposal Report
Well:
Wellbore:
MPF-18
MPU F-18L-01
Survey Calculation Method:Minimum Curvature
F-18 Gyrodata @ 40.65usft
Design:MPU F-18L1-01 wp04
Database:NORTH US + CANADA
MD Reference:F-18 Gyrodata @ 40.65usft
North Reference:
Well MPF-18
True
Measured
Depth
(usft)
Inclination
(°)
Azimuth
(°)
+E/-W
(usft)
Map
Northing
(usft)
Map
Easting
(usft)
+N/-S
(usft)
Planned Survey
Vertical
Depth
(usft)
TVDss
usft
DLS
5,760.86
Vert Section
11,500.00 70.43 5,801.51 7,284.52 -5,194.89327.48 536,508.9746,042,578.5395,760.86 0.924 4,447.27
11,550.00 70.17 5,818.37 7,324.17 -5,220.26327.28 536,483.3796,042,618.0405,777.72 0.642 4,472.69
11,600.00 69.81 5,835.47 7,363.68 -5,245.67327.24 536,457.7516,042,657.4115,794.82 0.724 4,497.97
11,650.00 69.61 5,852.81 7,403.08 -5,271.12327.04 536,432.0866,042,696.6575,812.16 0.548 4,523.13
11,700.00 69.29 5,870.36 7,442.34 -5,296.61326.97 536,406.3736,042,735.7775,829.71 0.653 4,548.15
11,750.00 68.68 5,888.29 7,481.40 -5,322.17326.62 536,380.5966,042,774.6825,847.64 1.384 4,572.95
11,800.00 68.77 5,906.44 7,520.27 -5,347.86326.46 536,354.6926,042,813.4045,865.79 0.348 4,597.53
11,850.00 69.92 5,924.07 7,559.23 -5,373.77326.29 536,328.5686,042,852.2115,883.42 2.322 4,622.10
11,900.00 69.36 5,941.47 7,598.18 -5,399.85326.10 536,302.2726,042,891.0115,900.82 1.175 4,646.59
11,950.00 69.13 5,959.19 7,636.94 -5,426.00325.90 536,275.9126,042,929.6215,918.54 0.593 4,670.88
12,000.00 68.91 5,977.09 7,675.53 -5,452.27325.60 536,249.4246,042,968.0595,936.44 0.712 4,694.96
12,050.00 68.77 5,995.14 7,713.96 -5,478.67325.42 536,222.8076,043,006.3395,954.49 0.437 4,718.84
12,100.00 69.27 6,013.04 7,752.31 -5,505.30325.04 536,195.9706,043,044.5345,972.39 1.226 4,742.55
12,150.00 70.12 6,030.39 7,790.71 -5,532.21324.92 536,168.8486,043,082.7815,989.74 1.715 4,766.20
12,200.00 69.87 6,047.50 7,829.15 -5,559.22324.88 536,141.6196,043,121.0646,006.85 0.506 4,789.83
12,250.00 69.62 6,064.81 7,867.48 -5,586.27324.70 536,114.3616,043,159.2346,024.16 0.603 4,813.35
12,300.00 69.50 6,082.27 7,905.75 -5,613.29324.86 536,087.1296,043,197.3536,041.62 0.384 4,836.83
12,350.00 69.48 6,099.79 7,944.01 -5,640.30324.68 536,059.9026,043,235.4506,059.14 0.340 4,860.30
12,400.00 69.26 6,117.40 7,982.15 -5,667.41324.53 536,032.5886,043,273.4386,076.75 0.522 4,883.63
12,450.00 69.42 6,135.04 8,020.22 -5,694.61324.37 536,005.1766,043,311.3466,094.39 0.438 4,906.84
12,500.00 69.61 6,152.54 8,058.21 -5,721.99324.07 535,977.5806,043,349.1866,111.89 0.678 4,929.92
12,550.00 69.76 6,169.90 8,096.09 -5,749.63323.71 535,949.7376,043,386.9086,129.25 0.739 4,952.79
12,600.00 69.53 6,187.29 8,133.77 -5,777.52323.26 535,921.6346,043,424.4226,146.64 0.961 4,975.36
12,650.00 69.59 6,204.75 8,171.26 -5,805.62323.04 535,893.3296,043,461.7516,164.10 0.429 4,997.68
12,700.00 69.53 6,222.22 8,208.64 -5,833.86322.81 535,864.8776,043,498.9696,181.57 0.447 5,019.84
12,750.00 69.58 6,239.68 8,245.94 -5,862.22322.71 535,836.3196,043,536.1036,199.03 0.212 5,041.88
12,800.00 69.19 6,257.29 8,283.12 -5,890.63322.51 535,807.6966,043,573.1226,216.64 0.865 5,063.78
12,850.00 69.20 6,275.05 8,320.12 -5,919.19322.16 535,778.9316,043,609.9566,234.40 0.655 5,085.46
12,900.00 69.28 6,292.77 8,356.99 -5,947.95321.93 535,749.9726,043,646.6556,252.12 0.459 5,106.94
12,950.00 69.01 6,310.57 8,393.71 -5,976.83321.70 535,720.8846,043,683.2156,269.92 0.690 5,128.23
13,000.00 67.21 6,329.21 8,430.31 -6,005.35322.45 535,692.1656,043,719.6456,288.56 3.860 5,149.56
13,050.00 65.78 6,349.15 8,466.66 -6,033.30322.44 535,664.0186,043,755.8326,308.50 2.860 5,170.91
13,100.00 63.94 6,370.39 8,502.71 -6,060.65323.19 535,636.4616,043,791.7326,329.74 3.923 5,192.24
13,150.00 63.15 6,392.67 8,538.75 -6,087.21324.03 535,609.7046,043,827.6126,352.02 2.181 5,213.88
13,200.00 62.32 6,415.57 8,574.84 -6,113.14324.59 535,583.5746,043,863.5596,374.92 1.936 5,235.83
13,250.00 62.04 6,438.91 8,611.12 -6,138.42325.67 535,558.0926,043,899.6936,398.26 1.991 5,258.23
13,300.00 61.99 6,462.37 8,647.78 -6,163.03326.58 535,533.2786,043,936.2086,421.72 1.610 5,281.25
13,350.00 60.15 6,486.56 8,684.18 -6,187.32325.98 535,508.7866,043,972.4656,445.91 3.827 5,304.17
13,400.00 59.81 6,511.57 8,720.03 -6,211.59325.82 535,484.3166,044,008.1746,470.92 0.734 5,326.60
13,450.00 58.33 6,537.27 8,755.54 -6,235.65325.96 535,460.0686,044,043.5446,496.62 2.970 5,348.81
13,500.00 58.13 6,563.59 8,790.72 -6,259.50325.78 535,436.0236,044,078.5946,522.94 0.504 5,370.81
13,550.00 56.24 6,590.69 8,825.44 -6,283.17325.62 535,412.1526,044,113.1696,550.04 3.790 5,392.45
13,600.00 56.08 6,618.53 8,859.64 -6,306.72325.29 535,388.4136,044,147.2406,577.88 0.635 5,413.69
13,650.00 53.88 6,647.22 8,893.26 -6,330.11325.06 535,364.8456,044,180.7176,606.57 4.416 5,434.45
13,700.00 53.02 6,677.00 8,926.10 -6,353.23324.65 535,341.5426,044,213.4286,636.35 1.842 5,454.63
1/18/2021 11:35:59PM COMPASS 5000.15 Build 91E Page 8
Project:
Company:
Local Co-ordinate Reference:
TVD Reference:
Site:
Hilcorp Alaska, LLC
Milne Point
M Pt F Pad
Standard Proposal Report
Well:
Wellbore:
MPF-18
MPU F-18L-01
Survey Calculation Method:Minimum Curvature
F-18 Gyrodata @ 40.65usft
Design:MPU F-18L1-01 wp04
Database:NORTH US + CANADA
MD Reference:F-18 Gyrodata @ 40.65usft
North Reference:
Well MPF-18
True
Measured
Depth
(usft)
Inclination
(°)
Azimuth
(°)
+E/-W
(usft)
Map
Northing
(usft)
Map
Easting
(usft)
+N/-S
(usft)
Planned Survey
Vertical
Depth
(usft)
TVDss
usft
DLS
6,667.04
Vert Section
13,750.00 51.25 6,707.69 8,958.23 -6,376.16324.31 535,318.4336,044,245.4226,667.04 3.580 5,474.24
13,800.00 50.54 6,739.23 8,989.73 -6,398.81324.24 535,295.6046,044,276.7906,698.58 1.424 5,493.39
13,850.00 49.40 6,771.39 9,020.86 -6,421.09324.58 535,273.1506,044,307.7946,730.74 2.339 5,512.36
13,900.00 48.60 6,804.19 9,051.58 -6,443.00324.43 535,251.0706,044,338.3906,763.54 1.616 5,531.12
13,950.00 46.97 6,837.78 9,081.66 -6,464.60324.22 535,229.3096,044,368.3476,797.13 3.275 5,549.42
14,000.00 45.49 6,872.37 9,110.91 -6,485.77323.96 535,207.9716,044,397.4686,831.72 2.984 5,567.14
14,050.00 44.39 6,907.76 9,139.39 -6,506.66323.54 535,186.9316,044,425.8306,867.11 2.279 5,584.29
14,100.00 44.77 6,943.38 9,167.63 -6,527.49323.63 535,165.9416,044,453.9526,902.73 0.770 5,601.25
14,150.00 45.03 6,978.79 9,196.04 -6,548.44323.56 535,144.8386,044,482.2376,938.14 0.529 5,618.30
14,200.00 45.30 7,014.05 9,224.55 -6,569.51323.52 535,123.6096,044,510.6326,973.40 0.543 5,635.40
14,250.00 45.53 7,049.14 9,253.17 -6,590.70323.42 535,102.2546,044,539.1257,008.49 0.482 5,652.54
14,300.00 45.60 7,084.15 9,281.81 -6,612.02323.28 535,080.7846,044,567.6457,043.50 0.244 5,669.66
14,350.00 45.26 7,119.24 9,310.32 -6,633.38323.03 535,059.2676,044,596.0277,078.59 0.768 5,686.63
14,400.00 45.10 7,154.48 9,338.65 -6,654.71323.00 535,037.7736,044,624.2347,113.83 0.323 5,703.45
14,435.00 44.95 7,179.22 9,358.42 -6,669.61322.99 535,022.7616,044,643.9207,138.57 0.441 5,715.19
14,455.00 46.75 7,193.15 9,369.88 -6,678.25322.99 535,014.0606,044,655.3277,152.50 9.000 5,721.99
14,460.00 48.75 7,196.51 9,372.83 -6,680.48322.99 535,011.8166,044,658.2697,155.86 40.000 5,723.74
14,470.00 52.75 7,202.84 9,379.01 -6,685.14322.99 535,007.1216,044,664.4247,162.19 40.000 5,727.41
14,480.00 56.75 7,208.61 9,385.53 -6,690.06322.99 535,002.1706,044,670.9157,167.96 40.000 5,731.28
14,490.00 60.75 7,213.80 9,392.36 -6,695.20322.99 534,996.9876,044,677.7107,173.15 40.000 5,735.33
14,500.00 64.75 7,218.38 9,399.45 -6,700.55322.99 534,991.5976,044,684.7767,177.73 40.000 5,739.54
14,510.00 68.75 7,222.32 9,406.79 -6,706.08322.99 534,986.0266,044,692.0797,181.67 40.000 5,743.89
14,520.00 72.75 7,225.62 9,414.33 -6,711.76322.99 534,980.3026,044,699.5837,184.97 40.000 5,748.37
14,530.00 76.75 7,228.25 9,422.03 -6,717.57322.99 534,974.4536,044,707.2517,187.60 40.000 5,752.94
14,538.14 80.00 7,229.89 9,428.39 -6,722.37322.99 534,969.6216,044,713.5857,189.24 40.000 5,756.71
14,540.00 80.13 7,230.21 9,429.86 -6,723.46323.73 534,968.5176,044,715.0537,189.56 40.000 5,757.59
14,550.00 80.86 7,231.87 9,438.01 -6,729.02327.72 534,962.9196,044,723.1697,191.22 40.000 5,762.68
14,560.00 81.63 7,233.39 9,446.54 -6,734.00331.69 534,957.8886,044,731.6727,192.74 40.000 5,768.35
14,570.00 82.44 7,234.78 9,455.42 -6,738.39335.65 534,953.4476,044,740.5217,194.13 40.000 5,774.57
14,580.00 83.28 7,236.02 9,464.59 -6,742.17339.59 534,949.6186,044,749.6727,195.37 40.000 5,781.33
14,590.00 84.16 7,237.11 9,474.02 -6,745.31343.51 534,946.4216,044,759.0807,196.46 40.000 5,788.58
14,600.00 85.06 7,238.05 9,483.65 -6,747.81347.43 534,943.8706,044,768.7007,197.40 40.000 5,796.29
14,610.00 85.99 7,238.83 9,493.45 -6,749.65351.33 534,941.9796,044,778.4867,198.18 40.000 5,804.42
14,620.00 86.93 7,239.45 9,503.36 -6,750.82355.23 534,940.7556,044,788.3887,198.80 40.000 5,812.94
14,630.00 87.89 7,239.90 9,513.34 -6,751.31359.11 534,940.2066,044,798.3607,199.25 40.000 5,821.79
14,638.14 88.68 7,240.15 9,521.47 -6,751.212.27 534,940.2596,044,806.4897,199.50 40.000 5,829.22
14,640.00 88.70 7,240.19 9,523.33 -6,751.123.02 534,940.3356,044,808.3527,199.54 40.000 5,830.95
14,650.00 88.85 7,240.41 9,533.29 -6,750.257.02 534,941.1536,044,818.3137,199.76 40.000 5,840.36
14,660.00 89.00 7,240.59 9,543.16 -6,748.6811.01 534,942.6636,044,828.1947,199.94 40.000 5,849.99
14,670.00 89.15 7,240.76 9,552.90 -6,746.4315.01 534,944.8596,044,837.9457,200.11 40.000 5,859.77
14,680.00 89.31 7,240.89 9,562.46 -6,743.5119.01 534,947.7306,044,847.5207,200.24 40.000 5,869.68
14,690.00 89.47 7,241.00 9,571.79 -6,739.9223.01 534,951.2616,044,856.8727,200.35 40.000 5,879.66
14,700.00 89.63 7,241.07 9,580.85 -6,735.7027.00 534,955.4356,044,865.9567,200.42 40.000 5,889.66
14,710.00 89.80 7,241.12 9,589.60 -6,730.8531.00 534,960.2336,044,874.7267,200.47 40.000 5,899.63
14,720.00 89.97 7,241.14 9,597.98 -6,725.4135.00 534,965.6306,044,883.1417,200.49 40.000 5,909.52
1/18/2021 11:35:59PM COMPASS 5000.15 Build 91E Page 9
Project:
Company:
Local Co-ordinate Reference:
TVD Reference:
Site:
Hilcorp Alaska, LLC
Milne Point
M Pt F Pad
Standard Proposal Report
Well:
Wellbore:
MPF-18
MPU F-18L-01
Survey Calculation Method:Minimum Curvature
F-18 Gyrodata @ 40.65usft
Design:MPU F-18L1-01 wp04
Database:NORTH US + CANADA
MD Reference:F-18 Gyrodata @ 40.65usft
North Reference:
Well MPF-18
True
Measured
Depth
(usft)
Inclination
(°)
Azimuth
(°)
+E/-W
(usft)
Map
Northing
(usft)
Map
Easting
(usft)
+N/-S
(usft)
Planned Survey
Vertical
Depth
(usft)
TVDss
usft
DLS
7,200.49
Vert Section
14,730.00 90.14 7,241.14 9,605.97 -6,719.3938.99 534,971.6006,044,891.1597,200.49 40.000 5,919.29
14,740.00 90.30 7,241.10 9,613.51 -6,712.8342.99 534,978.1156,044,898.7427,200.45 40.000 5,928.88
14,750.00 90.47 7,241.03 9,620.58 -6,705.7646.99 534,985.1436,044,905.8527,200.38 40.000 5,938.26
KOP : Start Dir 12º/100' : 14750' MD, 7241.03'TVD : 88° RT TF
14,775.00 90.57 7,240.80 9,637.15 -6,687.0549.98 535,003.7646,044,922.5237,200.15 12.000 5,961.14
14,800.00 90.67 7,240.53 9,652.72 -6,667.4952.98 535,023.2316,044,938.1977,199.88 12.000 5,983.45
14,825.00 90.77 7,240.22 9,667.24 -6,647.1555.98 535,043.4926,044,952.8317,199.57 12.000 6,005.14
14,850.00 90.87 7,239.86 9,680.68 -6,626.0758.98 535,064.4896,044,966.3857,199.21 12.000 6,026.16
14,875.00 90.97 7,239.45 9,692.99 -6,604.3261.98 535,086.1666,044,978.8227,198.80 12.000 6,046.43
14,900.00 91.06 7,239.01 9,704.15 -6,581.9664.98 535,108.4646,044,990.1077,198.36 12.000 6,065.92
14,925.00 91.15 7,238.53 9,714.13 -6,559.0467.98 535,131.3216,045,000.2097,197.88 12.000 6,084.56
14,950.00 91.24 7,238.01 9,722.89 -6,535.6470.98 535,154.6746,045,009.1027,197.36 12.000 6,102.30
14,975.00 91.24 7,237.46 9,731.65 -6,512.2367.98 535,178.0276,045,017.9957,196.81 12.000 6,120.04
15,000.00 91.23 7,236.92 9,741.63 -6,489.3264.97 535,200.8836,045,028.0987,196.27 12.000 6,138.68
15,025.00 91.22 7,236.39 9,752.79 -6,466.9661.97 535,223.1786,045,039.3837,195.74 12.000 6,158.16
15,050.00 91.21 7,235.86 9,765.11 -6,445.2158.97 535,244.8526,045,051.8217,195.21 12.000 6,178.44
15,075.00 91.20 7,235.33 9,778.54 -6,424.1455.97 535,265.8466,045,065.3767,194.68 12.000 6,199.45
15,100.00 91.18 7,234.81 9,793.07 -6,403.8052.97 535,286.1016,045,080.0117,194.16 12.000 6,221.14
15,125.00 91.16 7,234.30 9,808.63 -6,384.2549.97 535,305.5626,045,095.6877,193.65 12.000 6,243.46
15,150.00 91.13 7,233.80 9,825.20 -6,365.5446.97 535,324.1776,045,112.3607,193.15 12.000 6,266.33
15,175.00 91.11 7,233.31 9,842.73 -6,347.7343.97 535,341.8936,045,129.9847,192.66 12.000 6,289.70
15,200.00 91.07 7,232.84 9,861.17 -6,330.8540.97 535,358.6636,045,148.5127,192.19 12.000 6,313.50
15,225.00 91.04 7,232.38 9,880.46 -6,314.9637.97 535,374.4406,045,167.8937,191.73 12.000 6,337.66
15,250.00 91.04 7,231.92 9,899.75 -6,299.0840.97 535,390.2176,045,187.2747,191.27 12.000 6,361.83
15,275.00 91.03 7,231.47 9,918.19 -6,282.2043.97 535,406.9876,045,205.8027,190.82 12.000 6,385.63
15,300.00 91.03 7,231.02 9,935.72 -6,264.3846.97 535,424.7046,045,223.4277,190.37 12.000 6,409.00
15,325.00 91.02 7,230.57 9,952.29 -6,245.6749.97 535,443.3196,045,240.1007,189.92 12.000 6,431.87
15,350.00 91.00 7,230.13 9,967.85 -6,226.1252.97 535,462.7826,045,255.7777,189.48 12.000 6,454.19
15,375.00 90.99 7,229.70 9,982.38 -6,205.7855.97 535,483.0386,045,270.4137,189.05 12.000 6,475.88
15,400.00 90.97 7,229.27 9,995.82 -6,184.7158.97 535,504.0336,045,283.9697,188.62 12.000 6,496.90
15,425.00 90.95 7,228.85 10,008.13 -6,162.9661.97 535,525.7096,045,296.4087,188.20 12.000 6,517.17
15,450.00 91.88 7,228.23 10,020.42 -6,141.2059.12 535,547.3976,045,308.8167,187.58 12.000 6,537.43
15,475.00 92.80 7,227.22 10,033.77 -6,120.0956.26 535,568.4296,045,322.2837,186.57 12.000 6,558.38
15,500.00 93.71 7,225.80 10,048.15 -6,099.6953.40 535,588.7476,045,336.7717,185.15 12.000 6,579.97
15,525.00 94.62 7,223.98 10,063.51 -6,080.0550.53 535,608.2956,045,352.2417,183.33 12.000 6,602.13
15,550.00 95.51 7,221.78 10,079.81 -6,061.2347.66 535,627.0206,045,368.6497,181.13 12.000 6,624.80
15,575.00 96.39 7,219.18 10,097.02 -6,043.2844.77 535,644.8716,045,385.9527,178.53 12.000 6,647.93
15,600.00 97.25 7,216.22 10,115.07 -6,026.2541.88 535,661.7986,045,404.1017,175.57 12.000 6,671.45
15,625.00 98.10 7,212.88 10,133.93 -6,010.1938.97 535,677.7556,045,423.0477,172.23 12.000 6,695.30
15,650.00 98.92 7,209.18 10,153.54 -5,995.1336.06 535,692.6996,045,442.7397,168.53 12.000 6,719.40
15,675.00 99.72 7,205.13 10,173.85 -5,981.1333.13 535,706.5886,045,463.1217,164.48 12.000 6,743.71
15,700.00 100.50 7,200.74 10,194.79 -5,968.2130.18 535,719.3846,045,484.1387,160.09 12.000 6,768.13
15,725.00 101.25 7,196.02 10,216.32 -5,956.4227.23 535,731.0536,045,505.7337,155.37 12.000 6,792.62
15,750.00 101.97 7,190.99 10,238.38 -5,945.7924.25 535,741.5626,045,527.8467,150.34 12.000 6,817.10
15,775.00 102.65 7,185.66 10,260.90 -5,936.3421.26 535,750.8826,045,550.4177,145.01 12.000 6,841.51
1/18/2021 11:35:59PM COMPASS 5000.15 Build 91E Page 10
Project:
Company:
Local Co-ordinate Reference:
TVD Reference:
Site:
Hilcorp Alaska, LLC
Milne Point
M Pt F Pad
Standard Proposal Report
Well:
Wellbore:
MPF-18
MPU F-18L-01
Survey Calculation Method:Minimum Curvature
F-18 Gyrodata @ 40.65usft
Design:MPU F-18L1-01 wp04
Database:NORTH US + CANADA
MD Reference:F-18 Gyrodata @ 40.65usft
North Reference:
Well MPF-18
True
Measured
Depth
(usft)
Inclination
(°)
Azimuth
(°)
+E/-W
(usft)
Map
Northing
(usft)
Map
Easting
(usft)
+N/-S
(usft)
Planned Survey
Vertical
Depth
(usft)
TVDss
usft
DLS
7,139.39
Vert Section
15,800.00 103.31 7,180.04 10,283.82 -5,928.1018.26 535,758.9896,045,573.3847,139.39 12.000 6,865.78
15,825.00 103.93 7,174.16 10,307.09 -5,921.1015.24 535,765.8596,045,596.6837,133.51 12.000 6,889.84
15,850.00 104.51 7,168.01 10,330.62 -5,915.3512.20 535,771.4746,045,620.2527,127.36 12.000 6,913.63
15,875.00 105.05 7,161.63 10,354.38 -5,910.879.15 535,775.8196,045,644.0257,120.98 12.000 6,937.08
15,900.00 108.01 7,154.52 10,378.05 -5,907.188.60 535,779.3856,045,667.7207,113.87 12.000 6,960.13
15,925.00 110.96 7,146.18 10,401.37 -5,903.768.04 535,782.6646,045,691.0547,105.53 12.000 6,982.74
15,950.00 113.91 7,136.64 10,424.26 -5,900.657.45 535,785.6506,045,713.9647,095.99 12.000 7,004.84
15,975.00 116.86 7,125.93 10,446.67 -5,897.846.83 535,788.3326,045,736.3867,085.28 12.000 7,026.37
16,000.00 119.80 7,114.07 10,468.53 -5,895.356.18 535,790.7046,045,758.2587,073.42 12.000 7,047.28
16,025.00 122.74 7,101.09 10,489.79 -5,893.175.49 535,792.7606,045,779.5227,060.44 12.000 7,067.50
16,045.00 125.09 7,089.93 10,506.32 -5,891.674.91 535,794.1726,045,796.0567,049.28 12.000 7,083.14
Total Depth : 16045' MD, 7089.93' TVD - 2 3/8" x 3 1/4"
Target Name
- hit/miss target
- Shape
TVD
(usft)
Northing
(usft)
Easting
(usft)
+N/-S
(usft)
+E/-W
(usft)
Tar gets
Dip Angle
(°)
Dip Dir.
(°)
F-18A L1 wp01 tgt4 7,090.65 6,045,726.000 535,774.00010,436.37 -5,912.230.00 0.00
- plan misses target center by 39.09usft at 15981.29usft MD (7123.05 TVD, 10452.23 N, -5897.18 E)
- Point
F-18A L1 wp01 tgt1 7,215.65 6,044,810.000 535,263.0009,523.16 -6,428.420.00 0.00
- plan misses target center by 225.76usft at 14975.00usft MD (7237.46 TVD, 9731.65 N, -6512.23 E)
- Point
F-18A L1 wp01 tgt3 7,165.65 6,045,659.000 535,757.00010,369.46 -5,929.610.00 0.00
- plan misses target center by 22.05usft at 15885.37usft MD (7158.83 TVD, 10364.24 N, -5909.31 E)
- Point
F-18A L1 wp01 tgt2 7,215.65 6,045,354.000 535,682.00010,064.85 -6,006.330.00 0.00
- plan misses target center by 49.01usft at 15577.36usft MD (7218.92 TVD, 10098.69 N, -6041.63 E)
- Point
Vertical
Depth
(usft)
Measured
Depth
(usft)
Casing
Diameter
(")
Hole
Diameter
(")Name
Casing Points
2 3/8" x 3 1/4"7,089.9316,045.00 2-3/8 3-1/4
Measured
Depth
(usft)
Vertical
Depth
(usft)
+E/-W
(usft)
+N/-S
(usft)
Local Coordinates
Comment
Plan Annotations
14,750.00 7,241.03 9,620.58 -6,705.76 KOP : Start Dir 12º/100' : 14750' MD, 7241.03'TVD : 88° RT TF
16,045.00 7,089.93 10,506.32 -5,891.67 Total Depth : 16045' MD, 7089.93' TVD
1/18/2021 11:35:59PM COMPASS 5000.15 Build 91E Page 11
18 January, 2021Milne PointM Pt F PadMPF-18MPU F-18L-015002922681MPU F-18L1-01 wp04Reference Design: M Pt F Pad - MPF-18 - MPU F-18L-01 - MPU F-18L1-01 wp04Closest Approach 3D Proximity Scan on Current Survey Data (Highside Reference)Well Coordinates: 6,035,324.04 N, 541,744.20 E (70° 30' 26.73" N, 149° 39' 30.47" W)Datum Height: F-18 Gyrodata @ 40.65usftScan Range: 14,750.00 to 16,045.00 usft. Measured Depth.Geodetic Scale Factor AppliedVersion: 5000.15 Build: 91EScan Radius is Unlimited . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,500.00 usftGLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of referenceScan Type:Scan Type:25.00
Milne PointHilcorp Alaska, LLCAnticollision Report for MPF-18 - MPU F-18L1-01 wp04Comparison Well Name - Wellbore Name - Design@MeasuredDepth(usft)MinimumDistance(usft)EllipseSeparation(usft)@MeasuredDepthusftClearanceFactorScan Radius is Unlimited . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,500.00 usftSite NameScan Range: 14,750.00 to 16,045.00 usft. Measured Depth. Closest Approach 3D Proximity Scan on Current Survey Data (Highside Reference)Reference Design: M Pt F Pad - MPF-18 - MPU F-18L-01 - MPU F-18L1-01 wp04MeasuredDepth(usft)Summary Based on MinimumSeparation WarningM Pt F PadMPF-10 - MPF-10 - MPF-10 1,558.47 14,750.00 1,179.43 14,571.50 4.11214,750.00Centre Distance Pass - MPF-10 - MPF-10 - MPF-101,558.47 14,750.00 1,179.43 14,571.50 4.11214,750.00Ellipse Separation Pass - MPF-10 - MPF-10 - MPF-10 1,633.07 14,850.00 1,233.24 14,562.13 4.08414,850.00Clearance Factor Pass - MPF-18 - MPF-18 - MPF-18174.78 14,750.00 171.36 14,644.14 50.98814,750.00Ellipse Separation Pass - MPF-18 - MPF-18 - MPF-18194.90 14,775.00 189.45 14,645.25 35.73614,775.00Clearance Factor Pass - MPF-18 - MPU F-18L1 - MPU F-18L1 wp04127.02 15,050.00 125.23 14,992.23 71.19215,050.00Ellipse Separation Pass - MPF-18 - MPU F-18L1 - MPU F-18L1 wp04400.14 16,025.00 392.79 15,806.46 54.43116,025.00Clearance Factor Pass - MPF-29 - MPF-29 - MPF-291,459.22 14,775.00 1,057.91 15,119.62 3.63614,775.00Clearance Factor Pass - MPF-29 - MPF-29 - MPF-29705.82 16,025.00 569.74 15,469.87 5.18716,025.00Ellipse Separation Pass - MPF-50 - MPF-50 - MPF-501,349.06 16,025.00 846.18 15,068.73 2.68316,025.00Clearance Factor Pass - MPF-90 - MPF-90 - MPF-901,614.36 14,750.00 1,253.85 14,118.58 4.47814,750.00Centre Distance Pass - MPF-90 - MPF-90 - MPF-901,614.36 14,750.00 1,253.85 14,118.58 4.47814,750.00Ellipse Separation Pass - MPF-90 - MPF-90 - MPF-901,786.85 15,025.00 1,338.49 14,055.77 3.98515,025.00Clearance Factor Pass - MPF-90 - MPF-90PB1 - MPF-90PB11,614.36 14,750.00 1,253.74 14,118.58 4.47714,750.00Centre Distance Pass - MPF-90 - MPF-90PB1 - MPF-90PB11,614.36 14,750.00 1,253.74 14,118.58 4.47714,750.00Ellipse Separation Pass - MPF-90 - MPF-90PB1 - MPF-90PB11,786.85 15,025.00 1,338.37 14,055.77 3.98415,025.00Clearance Factor Pass - Survey tool programFrom(usft)To(usft)Survey/Plan Survey Tool110.00 14,435.003_Gyro-CT_pre-1998_Pipe14,435.00 14,750.003_MWD14,750.00 16,045.00 MPU F-18L1-01 wp04 3_MWD18 January, 2021-23:39COMPASSPage 2 of 5
Milne PointHilcorp Alaska, LLCAnticollision Report for MPF-18 - MPU F-18L1-01 wp04Ellipse error terms are correlated across survey tool tie-on points.Separation is the actual distance between ellipsoids.Calculated ellipses incorporate surface errors.Clearance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation).Distance Between centres is the straight line distance between wellbore centres.All station coordinates were calculated using the Minimum Curvature method.18 January, 2021-23:39COMPASSPage 3 of 5
Well Bighole Date
Quick Test Sub to Otis -1.1 ft
Top of 7" Otis 0.0 ft
Distances from top of riser
Excluding quick-test sub
Top of Annular 6.0 ft
Top of Annular Element 6.7 ft
Bottom Annular 8.0 ft
CL Blind/Shears 9.3 ft
CL 2-3/8" Pipe/Slips 10.1 ft
B1 B2 B3 B4 Choke Line
Kill Line
CL 3" Pipe/Slips 12.6 ft
CL 2-3/8" Pipe/Slips 13.4 ft
CL of Top Swab 16.0 ft
Swab Test Pump Hose
T1 T2
Swab 1
CL of Flow Cross 17.4 ft
Master
CL of Master 18.8 ft
LDS
IA
OA
LDS
Ground Level
CDR2-AC 4 Ram BOP Schematic 15-Jan-21
CDR2 Rig's Drip Pan
7-1/16" 5k Flange X 7" Otis Box
Hydril 7 1/16"
Annular
2-3/8" Pipe/Slips
7-1/16"
5k Mud
Cross
2-3/8"Pipe/Slips
Blind/Shear
7-1/16"
5 Mud
Cross
3" Pipe/Slips
Revised 2/2015
TRANSMITTAL LETTER CHECKLIST
WELL NAME: ______________________________________
PTD: _____________________________________________
___ Development ___ Service ___ Exploratory ___ Stratigraphic Test ___ Non-Conventional
FIELD: ____________________________ POOL: ______________________________________
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK OPTIONS TEXT FOR APPROVAL LETTER
MULTI
LATERAL
(If last two digits
in API number are
between 60-69)
The permit is for a new wellbore segment of existing well Permit
No. _____________, API No. 50-_______________________.
Production should continue to be reported as a function of the original
API number stated above.
Pilot Hole
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both
well name (_______________________PH) and API number
(50-_____________________) from records, data and logs acquired for
well (name on permit).
Spacing
Exception
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of
a conservation order approving a spacing exception.
(_____________________________) as Operator assumes the liability
of any protest to the spacing exception that may occur.
Dry Ditch Sample
All dry ditch sample sets submitted to the AOGCC must be in no greater
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Non-
Conventional
Well
Please note the following special condition of this permit:
Production or production testing of coal bed methane is not allowed for
well ( ) until after ( )
has designed and implemented a water well testing program to provide
baseline data on water quality and quantity.
(________________________) must contact the AOGCC to obtain
advance approval of such water well testing program.
Well Logging
Requirements
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types
of well logs to be run. In addition to the well logging program proposed
by (_______________________________) in the attached application,
the following well logs are also required for this well:
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this
well.
196-100X
X
221-008
Milne Point Kuparuk River Oil
029-22681-00-00
Milne Point Unit F-18L1-01
:(//3(50,7&+(&./,67&RPSDQ\+LOFRUS$ODVND//&:HOO1DPH0,/1(3781,7)/,QLWLDO&ODVV7\SH6(53(1'*HR$UHD8QLW2Q2II6KRUH2Q3URJUDP6(5)LHOG 3RRO:HOOERUHVHJ$QQXODU'LVSRVDO37'0,/1(32,17.83$58.5,9(52,/1$ 3HUPLWIHHDWWDFKHG<HV 6XUIDFH/RFDWLRQOLHVZLWKLQ$'/3RUWLRQRI:HOO3DVVHV7KUX$'/ /HDVHQXPEHUDSSURSULDWH<HV 7RS3URG,QW 7'OLHZLWKLQ$'/ 8QLTXHZHOOQDPHDQGQXPEHU<HV 0LOQH3RLQW.XSDUXN5LYHU2LO3RROJRYHUQHGE\&RQVHUYDWLRQ2UGHU1R' :HOOORFDWHGLQDGHILQHGSRRO<HV :HOOERUHZLOOEHPRUHWKDQ
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dts 2/1/2021JLC 2/1/2021