Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout221-107DATA SUBMITTAL COMPLIANCE REPORT
API No.50-029-21706-60-00Well Name/No.KUPARUK RIV UNIT 3M-05L1
Completion Status 1-OILCompletion Date 2/3/2022
Permit to Drill 2211070 Operator ConocoPhillips Alaska, Inc.
MD 10977 TVD 6209 Current Status 1-OIL
8/17/2023
UIC No
Well Log Information:
Digital
Med/Frmt ReceivedStart Stop
OH /
CH Comments
Log
Media
Run
No
Electr
Dataset
Number Name
Interval
List of Logs Obtained:GR/RES
NoNo YesMud Log Samples Directional Survey
REQUIRED INFORMATION
(from Master Well Data/Logs)
DATA INFORMATION
Log/
Data
Type
Log
Scale
DF 3/4/20228452 10977 Electronic Data Set, Filename: 3M-05L1 GAMMA
RES.las
36397ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1 2MD Final Log.cgm36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1 5MD Final Log.cgm36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1 5TVDSS Final Log.cgm36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1 Run 15 PWD Log.cgm36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1 Run 16 PWD Log.cgm36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1 GAMMA RES.ASC36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1_PWD Log Run 15.ASC36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1_PWD Log Run 16.ASC36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1 2MD Final.pdf36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1 5MD Final.pdf36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1 5TVDSS Final.pdf36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1 Run 15 PWD Log.pdf36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1 Run 16 PWD Log.pdf36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1 NAD27 Definitive
Survey Report.pdf
36397ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1 NAD27.txt36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1 NAD83 Definitive
Survey Report.pdf
36397ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1 NAD83.txt36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1 2MD Final Log.tif36397EDDigital Data
Thursday, August 17, 2023AOGCC Page 1 of 6
PB1
3M-05L1 GAMMA
RES.las
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-029-21706-60-00Well Name/No.KUPARUK RIV UNIT 3M-05L1
Completion Status 1-OILCompletion Date 2/3/2022
Permit to Drill 2211070 Operator ConocoPhillips Alaska, Inc.
MD 10977 TVD 6209 Current Status 1-OIL
8/17/2023
UIC No
DF 3/4/2022 Electronic File: 3M-05L1 5MD Final Log.tif36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1 5TVDSS Final Log.tif36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1 Run 15 PWD Log.tif36397EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1 Run 16 PWD Log.tif36397EDDigital Data
DF 3/4/20228452 10400 Electronic Data Set, Filename: 3M-05L1PB1
GAMMA RES.las
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 2MD Final Log.cgm36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 5MD Final Log.cgm36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 5TVDSS Final
Log.cgm
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 01 PWD
Log.cgm
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 02 PWD
Log.cgm
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 03 PWD
Log.cgm
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 04 PWD
Log.cgm
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 05 PWD
Log.cgm
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 06 PWD
Log.cgm
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 07 PWD
Log.cgm
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 08 PWD
Log.cgm
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 09 PWD
Log.cgm
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 10 PWD
Log.cgm
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 11 PWD
Log.cgm
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 12 PWD
Log.cgm
36398ED Digital Data
Thursday, August 17, 2023AOGCC Page 2 of 6
3M-05L1PB1
GAMMA RES.las
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-029-21706-60-00Well Name/No.KUPARUK RIV UNIT 3M-05L1
Completion Status 1-OILCompletion Date 2/3/2022
Permit to Drill 2211070 Operator ConocoPhillips Alaska, Inc.
MD 10977 TVD 6209 Current Status 1-OIL
8/17/2023
UIC No
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 13 PWD
Log.cgm
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 14 PWD
Log.cgm
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 GAMMA RES.ASC36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1_PWD Digital Data
Run 01.ASC
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1_PWD Digital Data
Run 02.ASC
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1_PWD Digital Data
Run 03.ASC
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1_PWD Digital Data
Run 04.ASC
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1_PWD Digital Data
Run 05.ASC
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1_PWD Digital Data
Run 06.ASC
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1_PWD Digital Data
Run 07.ASC
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1_PWD Digital Data
Run 08.ASC
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1_PWD Digital Data
Run 09.ASC
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1_PWD Digital Data
Run 10.ASC
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1_PWD Digital Data
Run 11.ASC
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1_PWD Digital Data
Run 12.ASC
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1_PWD Digital Data
Run 13.ASC
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1_PWD Digital Data
Run 14.ASC
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 2MD Final Log.pdf36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 5MD Final Log.pdf36398EDDigital Data
Thursday, August 17, 2023AOGCC Page 3 of 6
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-029-21706-60-00Well Name/No.KUPARUK RIV UNIT 3M-05L1
Completion Status 1-OILCompletion Date 2/3/2022
Permit to Drill 2211070 Operator ConocoPhillips Alaska, Inc.
MD 10977 TVD 6209 Current Status 1-OIL
8/17/2023
UIC No
DF 3/4/2022 Electronic File: 3M-05L1PB1 5TVDSS Final
Log.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 01 PWD
Log.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 02 PWD
Log.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 03 PWD
Log.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 04 PWD
Log.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 05 PWD
Log.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 06 PWD
Log.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 07 PWD
Log.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 08 PWD
Log.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 09 PWD
Log.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 10 PWD
Log.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 11 PWD
Log.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 12 PWD
Log.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 13 PWD
Log.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 14 PWD
Log.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 NAD27 Definitive
Survey Report.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 NAD27.txt36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 NAD83 Definitive
Survey Report.pdf
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 NAD83.txt36398EDDigital Data
Thursday, August 17, 2023AOGCC Page 4 of 6
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-029-21706-60-00Well Name/No.KUPARUK RIV UNIT 3M-05L1
Completion Status 1-OILCompletion Date 2/3/2022
Permit to Drill 2211070 Operator ConocoPhillips Alaska, Inc.
MD 10977 TVD 6209 Current Status 1-OIL
8/17/2023
UIC No
Well Cores/Samples Information:
ReceivedStart Stop Comments
Total
Boxes
Sample
Set
NumberName
Interval
INFORMATION RECEIVED
Completion Report
Production Test Information
Geologic Markers/Tops
Y
Y / NA
Y
Mud Logs, Image Files, Digital Data
Composite Logs, Image, Data Files
Cuttings Samples
Y / NA
Y
Y / NA
Directional / Inclination Data
Mechanical Integrity Test Information
Daily Operations Summary
Y
Y / NA
Y
Core Chips
Core Photographs
Laboratory Analyses
Y / NA
Y / NA
Y / NA
COMPLIANCE HISTORY
DF 3/4/2022 Electronic File: 3M-05L1PB1 2MD Final Log.tif36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 5MD Final Log.tif36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 5TVDSS Final
Log.tif
36398ED Digital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 01 PWD Log.tif36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 02 PWD Log.tif36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 03 PWD Log.tif36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 04 PWD Log.tif36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 05 PWD Log.tif36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 06 PWD Log.tif36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 07 PWD Log.tif36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 08 PWD Log.tif36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 09 PDW Log.tif36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 10 PDW Log.tif36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 11 PWD Log.tif36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 12 PWD Log.tif36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 13 PWD Log.tif36398EDDigital Data
DF 3/4/2022 Electronic File: 3M-05L1PB1 Run 14 PWD Log.tif36398EDDigital Data
Thursday, August 17, 2023AOGCC Page 5 of 6
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-029-21706-60-00Well Name/No.KUPARUK RIV UNIT 3M-05L1
Completion Status 1-OILCompletion Date 2/3/2022
Permit to Drill 2211070 Operator ConocoPhillips Alaska, Inc.
MD 10977 TVD 6209 Current Status 1-OIL
8/17/2023
UIC No
Comments:
Compliance Reviewed By:Date:
Date CommentsDescription
Completion Date:2/3/2022
Release Date:12/20/2021
Thursday, August 17, 2023AOGCC Page 6 of 6
M. Guhl 8/21/2023
! "# $
%&' %&' &(! )))))))))))))))))) * +*,
&! - !.
. /! &
!0
$
1 2
%&
!
/* (3 ! * 4 5 ,6*-&!&
!
(*
,(
* % 27034
( 87
,
+8*9 :0,; 5 $+
/* (3 8 .&24 , :0,; <&6 &
!
(* #= $= >= /
,% #= $= >= / ; :0,; ,*9(!( :0,;
, #= $= >= /
* %*
$ ?3 *4&1 .(
(( 6=0 ,@:0,;
! * *(! &0 3( :4
+
606
1
8
,,
:
-A B=/ C
<=05A '= 1/<C
2A '= -1-C
=105A =5 -<C
/
* D* E ? &
-
$
*(*
+
+*! E ? &
",B%&,"6;3:4 :
&,&F%&
7:,"6%"
2
7
* : (
37@+.+( . *4
B
,
* ( =:7
,
+*
=:7
$=%3*4
/=B
6
<6(" F8-1(
F
96 70F
96
8#1-.*+.F<<=1-
'
$1.
.1.
7
$./C7&.21C7".*.,1&.65".:
1/-C7.1<C7.*1.,1&.6<".:
6"+
(
<1-=<2C:-55=-<C,;
"+
=8 =8
-5
55555
/-1<
050 2
7@,
+
5<
-2
2-
=8
6
,%
&,",
0/0
(,
=8 =
6 9G
513434 ** *(!
5</5C
(*
-H
1-H
C
6"
-H
22
11/
,
",,%&",B:
(*
(*
&0
B
"%>":
&,
"
.! .@* **
( ,$(+ *
.
! !
+.
.+!!$.
*. $. $.!+ **.! .(! . !
.*!
.*+** .D@$.(
**$!!$
* +(*$
1A
(*
=0/A
(*
":"&,%&6"
6
--5-
",,%&",B,;
-/
,
5<C:0-C,;
<22C,0-<C,;
&5/=15
-C:0-C,;
5-/-C:0-/C,;
-- --</
%&,"6
7,
<21C7.-C7.*<.,1&.6<".:
8
,,
:
,,"
7F
F
%&
&"6;,%
&
::%%
&
*9.%*
010
<12C
/A
/2H
(* /1C
5--C:0-/C,;
52-C:1=0A
%>" ",B",3:4
5/C:0--C,;
F"6",3:0,;4
<2C -55C
%(?. * 3:0,;(,8 !I(
G&
!I (4
%.76,6".":"&,J"">".",
%&.%&"6&":"&,%&6"
6
+
.
112.
! * * @ <$(*! .
5=0A
,8%&6"
6
7!=/26 10
! @ 1$(! .
.!
By Meredith Guhl at 11:05 am, Mar 16, 2022
Completion Date
2/3/2022
MDG
RBDMS 3/16/2022 MDG
GDSR-3/16/22WCB 2023-07-14
010
DLB
F
96 70F
96
!
! &
!0
23.4'
DLB 03/21/2022
!
DLB
Conventional Core(s): Yes No Sidewall Cores:
N/A
30.
MD TVD
Surface Surface
1600' 1600'
Top of Productive Interval
8646'6155'
10977'6209'
10400' 6150'
31. List of Attachments:Schematic, Definitive Survey, Summary of Operations
32. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name: Shane Germann
Contact Email: shane.germann@conocophillips.com
Authorized Contact Phone: (907) 2263-4597
General:
Item 1a:
Item 1b:
Item 4b:
Item 9:
Item 15:
Item 19:
Item 20:
Item 22:
Item 23:
Item 24:
Item 27:
Item 28:
Item 30:
Item 31:
Formation at total depth PB1:
The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements
given in other spaces on this form and in any attachments.
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
TPI (Top of Producing Interval).
INSTRUCTIONS
Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram
with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical
reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and
other tests as required including, but not limited to: core analysis, paleontological report, production or well test results.
Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29.
Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit
detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity,
permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology.
Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345),
and/or Easement (ADL 123456) number.
Authorized Name:
Authorized Title:
Signature w/Date:
Shane Germann
Senior CTD Engineer
The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
FORMATION TESTS
Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion,
suspension, or abandonment, whichever occurs first.
Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other.
Kuparuk A3
Kuparuk A1
Kuparuk A2
Formation at total depth:
If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form,
if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071.
Yes No
Well tested? Yes No
28. CORE DATA
If yes, list intervals and formations tested, briefly summarizing test results.
Attach separate pages to this form, if needed, and submit detailed test
information, including reports, per 20 AAC 25.071.
NAME
Permafrost - Top
Permafrost - Base
29. GEOLOGIC MARKERS (List all formations and markers encountered):
N
No N
Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment
Digitally signed by Jeff ConnellyDN: C=US, OU=CTD, O=ConocoPhillips, CN=Jeff Connelly, E=jeff.s.connelly@conocophillips.com
Reason: I am the author of this document
Location: your signing location hereDate: 2022.03.16 09:52:28-08'00'Foxit PDF Editor Version: 11.0.0Jeff Connelly
3M
-
0
5
F
i
n
a
l
C
T
D
S
c
h
e
m
a
t
i
c
9-
5
/
8
"
3
6
#
J
-
5
5
s
h
o
e
@
4
3
5
1
'
M
D
7"
2
6
#
J
-
5
5
s
h
o
e
@
8
9
4
8
'
M
D
16
"
6
2
.
5
#
H
-
4
0
sh
o
e
@
1
1
5
'
M
D
A-
s
a
n
d
p
e
r
f
s
86
6
6
'
-
8
7
3
9
'
M
D
86
8
5
'
M
D
T
O
W
S
(F
a
i
l
e
d
W
i
n
d
o
w
)
3-
1
/
2
"
N
i
p
p
l
e
(
2
.
8
1
3
"
m
i
n
I
D
)
@
4
7
4
'
M
D
3-
1
/
2
"
9
.
3
#
L
-
8
0
E
U
E
8
r
d
T
u
b
i
n
g
t
o
s
u
r
f
a
c
e
3-
1
/
2
"
C
a
m
c
o
g
a
s
l
i
f
t
m
a
n
d
r
e
l
s
@
29
4
2
'
M
D
48
8
8
'
M
D
61
9
1
'
M
D
71
7
6
'
M
D
78
8
8
'
M
D
84
3
7
'
M
D
Bl
u
e
P
a
c
k
M
a
x
R
H
p
a
c
k
e
r
@
8
5
0
4
'
M
D
3-
1
/
2
"
N
i
p
p
l
e
(
2
.
8
1
3
"
m
i
n
I
D
)
@
8
6
1
6
'
M
D
3-
1
/
2
"
N
i
p
p
l
e
(
2
.
8
1
3
"
m
i
n
I
D
)
@
8
6
7
7
'
M
D
3-
1
/
2
"
N
i
p
p
l
e
(
2
.
8
1
3
"
m
i
n
I
D
)
@
8
6
9
7
'
M
D
3M
-
0
5
L
1
TD
=
1
0
,
9
7
7
'
M
D
To
p
o
f
B
i
l
l
e
t
=
9
3
0
6
'
M
D
3M
-
0
5
L
1
-
0
1
TD
=
1
0
,
9
8
7
'
M
D
To
p
o
f
B
i
l
l
e
t
=
8
7
3
5
'
M
D
3M
-
0
5
L
1
-
0
2
TD
=
1
1
,
7
1
8
'
M
D
To
p
o
f
B
i
l
l
e
t
=
9
5
9
7
'
M
D
3M
-
0
5
L
1
-
0
3
TD
=
1
1
,
7
1
7
'
M
D
Li
n
e
r
t
o
p
p
a
c
k
e
r
=
8
6
3
7
'
M
D
Sl
o
t
t
e
d
l
i
n
e
r
f
r
o
m
T
D
u
p
t
o
8
7
2
3
'
M
D
(
s
w
e
l
l
pa
c
k
e
r
)
Bl
a
n
k
L
i
n
e
r
f
r
o
m
8
7
1
0
'
u
p
t
o
8
6
3
7
'
M
D
(
l
i
n
e
r
to
p
p
a
c
k
e
r
)
No
r
t
h
e
r
n
S
o
l
u
t
i
o
n
s
W
e
d
g
e
*
3
-
1
/
2
"
9
.
3
#
L
-
8
0
B
a
s
e
P
i
p
e
*
6
"
O
D
(
2
0
'
l
o
n
g
)
*
~
4
0
'
T
o
t
a
l
L
e
n
g
t
h
*
0
.
6
2
5
"
B
o
r
e
t
h
r
u
U
p
p
e
r
T
r
a
y
*
1
.
1
2
5
"
B
o
r
e
t
h
r
u
L
o
w
e
r
S
e
c
t
i
o
n
*
H
E
S
2
.
8
1
"
X
N
i
p
p
l
e
b
e
l
o
w
86
6
5
'
M
D
T
O
W
S
(F
a
i
l
e
d
W
i
n
d
o
w
)
86
4
6
'
M
D
TO
W
S
d
e
p
t
h
3M
-
0
5
L
1
P
B
1
PB
T
D
=
1
0
,
4
0
0
'
M
D
An
c
h
o
r
e
d
B
i
l
l
e
t
=
8
9
5
0
'
M
D
3M
-
0
5
F
i
n
a
l
C
T
D
S
c
h
e
m
a
t
i
c
9-
5
/
8
"
3
6
#
J
-
5
5
s
h
o
e
@
4
3
5
1
'
M
D
7"
2
6
#
J
-
5
5
s
h
o
e
@
8
9
4
8
'
M
D
16
"
6
2
.
5
#
H
-
4
0
sh
o
e
@
1
1
5
'
M
D
A-
s
a
n
d
p
e
r
f
s
86
6
6
'
-
8
7
3
9
'
M
D
86
8
5
'
M
D
T
O
W
S
(F
a
i
l
e
d
W
i
n
d
o
w
)
3-
1
/
2
"
N
i
p
p
l
e
(
2
.
8
1
3
"
m
i
n
I
D
)
@
4
7
4
'
M
D
3-
1
/
2
"
9
.
3
#
L
-
8
0
E
U
E
8
r
d
T
u
b
i
n
g
t
o
s
u
r
f
a
c
e
3-
1
/
2
"
C
a
m
c
o
g
a
s
l
i
f
t
m
a
n
d
r
e
l
s
@
29
4
2
'
M
D
48
8
8
'
M
D
61
9
1
'
M
D
71
7
6
'
M
D
78
8
8
'
M
D
84
3
7
'
M
D
Bl
u
e
P
a
c
k
M
a
x
R
H
p
a
c
k
e
r
@
8
5
0
4
'
M
D
3-
1
/
2
"
N
i
p
p
l
e
(
2
.
8
1
3
"
m
i
n
I
D
)
@
8
6
1
6
'
M
D
3-
1
/
2
"
N
i
p
p
l
e
(
2
.
8
1
3
"
m
i
n
I
D
)
@
8
6
7
7
'
M
D
3-
1
/
2
"
N
i
p
p
l
e
(
2
.
8
1
3
"
m
i
n
I
D
)
@
8
6
9
7
'
M
D
3M
-
0
5
L
1
TD
=
1
0
,
9
7
7
'
M
D
To
p
o
f
B
i
l
l
e
t
=
9
3
0
6
'
M
D
3M
-
0
5
L
1
-
0
1
TD
=
1
0
,
9
8
7
'
M
D
To
p
o
f
B
i
l
l
e
t
=
8
7
3
5
'
M
D
3M
-
0
5
L
1
-
0
2
TD
=
1
1
,
7
1
8
'
M
D
To
p
o
f
B
i
l
l
e
t
=
9
5
9
7
'
M
D
3M
-
0
5
L
1
-
0
3
TD
=
1
1
,
7
1
7
'
M
D
Li
n
e
r
t
o
p
p
a
c
k
e
r
=
8
6
3
7
'
M
D
Sl
o
t
t
e
d
l
i
n
e
r
f
r
o
m
T
D
u
p
t
o
8
7
2
3
'
M
D
(
s
w
e
l
l
pa
c
k
e
r
)
Bl
a
n
k
L
i
n
e
r
f
r
o
m
8
7
1
0
'
u
p
t
o
8
6
3
7
'
M
D
(
l
i
n
e
r
to
p
p
a
c
k
e
r
)
No
r
t
h
e
r
n
S
o
l
u
t
i
o
n
s
W
e
d
g
e
*
3
-
1
/
2
"
9
.
3
#
L
-
8
0
B
a
s
e
P
i
p
e
*
6
"
O
D
(
2
0
'
l
o
n
g
)
*
~
4
0
'
T
o
t
a
l
L
e
n
g
t
h
*
0
.
6
2
5
"
B
o
r
e
t
h
r
u
U
p
p
e
r
T
r
a
y
*
1
.
1
2
5
"
B
o
r
e
t
h
r
u
L
o
w
e
r
S
e
c
t
i
o
n
*
H
E
S
2
.
8
1
"
X
N
i
p
p
l
e
b
e
l
o
w
86
6
5
'
M
D
T
O
W
S
(F
a
i
l
e
d
W
i
n
d
o
w
)
86
4
6
'
M
D
TO
W
S
d
e
p
t
h
3M
-
0
5
L
1
P
B
1
PB
T
D
=
1
0
,
4
0
0
'
M
D
An
c
h
o
r
e
d
B
i
l
l
e
t
=
8
9
5
0
'
M
D
Last Tag
Annotation Depth (ftKB) End Date Wellbore Last Mod By
Last Tag: RKB (Est. 3' of Rathole) 8,742.0 11/14/2019 3M-05 zembaej
Last Rev Reason
Annotation End Date Wellbore Last Mod By
Rev Reason: Set LTP 2/17/2022 3M-05 fergusp
Casing Strings
Casing Description
CONDUCTOR
OD (in)
16
ID (in)
15.06
Top (ftKB)
38.0
Set Depth (ftKB)
115.0
Set Depth (TVD) …
115.0
Wt/Len (l…
62.50
Grade
H-40
Top Thread
WELDED
Casing Description
SURFACE
OD (in)
9 5/8
ID (in)
8.92
Top (ftKB)
37.0
Set Depth (ftKB)
4,351.4
Set Depth (TVD) …
3,419.3
Wt/Len (l…
36.00
Grade
J-55
Top Thread
BTC
Casing Description
7" Tie-Back Patch
OD (in)
7
ID (in)
6.28
Top (ftKB)
42.2
Set Depth (ftKB)
2,725.0
Set Depth (TVD) …
2,333.8
Wt/Len (l…
26.00
Grade
L-80
Top Thread
Hyd 563
Casing Description
PRODUCTION
ORIGINAL
OD (in)
7
ID (in)
6.28
Top (ftKB)
2,725.0
Set Depth (ftKB)
8,948.2
Set Depth (TVD) …
6,355.9
Wt/Len (l…
26.00
Grade
J-55
Top Thread
BTC
Casing Description
L1-03 Liner
OD (in)
2 3/8
ID (in)
1.99
Top (ftKB)
8,637.3
Set Depth (ftKB)
11,717.0
Set Depth (TVD) … Wt/Len (l…
4.60
Grade
L-80
Top Thread
STL
Liner Details
Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com
Nominal ID
(in)
8,637.3 6,148.8 48.22 SBR (Seal Bore
Receptacle)
NSAK 225 Sealbore Deployment Sleeve (PBR) 2.250
8,710.6 6,197.7 48.25 Swell Packer Swell Packer - Reactive 1.686
9,576.6 Deployment
Sleeve
NSAK 350-238 OH Permanent QCLL 1.920
10,831.5 Deployment
Sleeve
NSAK 350-238 OH Permanent QCLL 1.920
Casing Description
L1-01 Liner
OD (in)
2 3/8
ID (in)
1.99
Top (ftKB)
8,738.7
Set Depth (ftKB)
10,987.0
Set Depth (TVD) … Wt/Len (l…
4.60
Grade
L-80
Top Thread
STL
Liner Details
Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com
Nominal ID
(in)
8,738.7 6,216.4 48.25 Aluminum Billet Aluminum Liner Top Billet 1.920
9,692.9 Deployment
Sleeve
Shorty deployment sleeve 1.920
Casing Description
L1 Liner
OD (in)
2 3/8
ID (in)
1.99
Top (ftKB)
9,306.9
Set Depth (ftKB)
10,975.0
Set Depth (TVD) … Wt/Len (l…
4.60
Grade
L-80
Top Thread
STL
Liner Details
Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com
Nominal ID
(in)
9,306.9 Aluminum Billet Liner top billet - Northern Solutions 1.920
Casing Description
L1-02 Liner
OD (in)
2 3/8
ID (in)
1.99
Top (ftKB)
9,598.7
Set Depth (ftKB)
11,717.0
Set Depth (TVD) … Wt/Len (l…
4.60
Grade
L-80
Top Thread
STL
Liner Details
Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com
Nominal ID
(in)
9,598.7 Aluminum Billet Aluminum Liner Top Billet 1.920
Tubing Strings
Tubing Description
Tubing – Production
String Ma…
3 1/2
ID (in)
2.99
Top (ftKB)
33.0
Set Depth (ft…
8,760.8
Set Depth (TVD) (…
6,231.1
Wt (lb/ft)
9.30
Grade
L80
Top Connection
EUE
Completion Details
Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Nominal ID (in)
OD Nominal
(in) Make Model
33.0 33.0 0.03 Hanger 3.910 4.500 FMC TC-1A
474.9 474.9 0.29 Nipple - X 2.813 3.770 HES X
2,942.3 2,492.7 43.17 Mandrel – GAS LIFT 2.926 5.679 SLB MMG
4,888.2 3,754.9 50.87 Mandrel – GAS LIFT 2.926 5.679 SLB MMG
6,190.7 4,598.3 49.20 Mandrel – GAS LIFT 2.926 5.679 SLB MMG
7,176.2 5,214.1 51.94 Mandrel – GAS LIFT 2.926 5.679 SLB MMG
7,887.1 5,661.0 50.41 Mandrel – GAS LIFT 2.926 5.679 SLB MMG
8,437.0 6,016.3 48.98 Mandrel – GAS LIFT 2.926 5.679 SLB MMG
8,503.6 6,060.1 48.81 Packer 2.885 6.276 SLB Bluepack
max
8,615.6 6,134.4 48.21 Nipple - X 2.813 3.770 HES "X"
8,663.0 6,166.0 48.23 Wedge Assembly 2.992 5.905 Northern
solutions
8,677.0 6,175.3 48.24 Nipple - X 2.813 4.500 Northern
Solutions
"X"
8,682.8 6,179.2 48.24 Wedge Assembly 2.992 5.905 Northern
solutions
8,696.8 6,188.5 48.25 Nipple - X 2.813 4.500 Northern
Solutions
"X"
8,739.0 6,216.6 48.25 Sleeve - Frac 2.770 4.490 Baker Huges
8,760.3 6,230.8 48.25 Wireline Guide 3.012 4.500 Halliburton
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top
(ftKB)
Top
(TVD)
(ftKB)
Top Incl
(°) Des Com Run Date ID (in) SN
8,626.4 6,141.6 48.21 PACKOFF Set NSAK Mono-Pak LTP. Set into liner top
@ 8637' RKB. (Drawing of LTP in
attachments)
2/17/2022 1.781 A22427201
8,646.0 6,154.7 48.22 WHIPSTOCK TOWS set at 8646', HS 1/28/2022 0.100
8,666.0 6,168.0 48.23 WHIPSTOCK WS set on X-Lock @ 8677 1/23/2022 0.100
8,677.0 6,175.3 48.24 CHOKE 2.813" X-LOCK W/ FLOW THRU SUB (1.75"
ID / 18" OAL)
1/23/2022 1.780
3M-05, 3/8/2022 9:29:46 AM
Vertical schematic (actual)
L1-03 Liner; 8,637.3-11,717.0
L1-02 Liner; 9,598.7-11,717.0
L1-01 Liner; 8,738.7-10,987.0
L1 Liner; 9,306.9-10,975.0
PRODUCTION ORIGINAL;
2,725.0-8,948.2
FISH; 8,807.0
FISH; 8,801.0
Sleeve - Frac; 8,739.0
IPERF; 8,736.0-8,739.0
IPERF; 8,728.0-8,731.0
IPERF; 8,686.0-8,718.0
IPERF; 8,682.0-8,720.0
CHOKE; 8,697.0
Nipple - X; 8,696.8
WHIPSTOCK; 8,685.0
OBSTRUCTION; 8,690.0
FISH; 8,685.0
CHOKE; 8,677.0
Nipple - X; 8,677.0
IPERF; 8,672.0-8,676.0
RPERF; 8,666.0-8,682.0
WHIPSTOCK; 8,666.0
WHIPSTOCK; 8,646.0
OTHER; 8,637.0
PACKOFF; 8,626.4
Nipple - X; 8,615.6
Packer; 8,503.6
Mandrel – GAS LIFT; 8,436.9
Mandrel – GAS LIFT; 7,887.1
Mandrel – GAS LIFT; 7,176.2
Mandrel – GAS LIFT; 6,190.7
Mandrel – GAS LIFT; 4,888.2
SURFACE; 37.0-4,351.4
Mandrel – GAS LIFT; 2,942.3
7" Tie-Back Patch; 42.2-2,725.0
Production String 1 Cement;
34.0 ftKB
Nipple - X; 474.9
CONDUCTOR; 38.0-115.0
Hanger; 33.0
KUP PROD
KB-Grd (ft)
39.61
Rig Release Date
3/24/1987
3M-05
...
TD
Act Btm (ftKB)
9,110.0
Well Attributes
Field Name
KUPARUK RIVER UNIT
Wellbore API/UWI
500292170600
Wellbore Status
PROD
Max Angle & MD
Incl (°)
52.78
MD (ftKB)
7,100.00
WELLNAME WELLBORE3M-05
Annotation
Last WO:
End Date
7/10/1992
H2S (ppm)
240
Date
12/10/2015
Comment
Last Tag
Annotation Depth (ftKB) End Date Wellbore Last Mod By
Last Tag: RKB (Est. 3' of Rathole) 8,742.0 11/14/2019 3M-05 zembaej
Last Rev Reason
Annotation End Date Wellbore Last Mod By
Rev Reason: Set LTP 2/17/2022 3M-05 fergusp
Casing Strings
Casing Description
CONDUCTOR
OD (in)
16
ID (in)
15.06
Top (ftKB)
38.0
Set Depth (ftKB)
115.0
Set Depth (TVD) …
115.0
Wt/Len (l…
62.50
Grade
H-40
Top Thread
WELDED
Casing Description
SURFACE
OD (in)
9 5/8
ID (in)
8.92
Top (ftKB)
37.0
Set Depth (ftKB)
4,351.4
Set Depth (TVD) …
3,419.3
Wt/Len (l…
36.00
Grade
J-55
Top Thread
BTC
Casing Description
7" Tie-Back Patch
OD (in)
7
ID (in)
6.28
Top (ftKB)
42.2
Set Depth (ftKB)
2,725.0
Set Depth (TVD) …
2,333.8
Wt/Len (l…
26.00
Grade
L-80
Top Thread
Hyd 563
Casing Description
PRODUCTION
ORIGINAL
OD (in)
7
ID (in)
6.28
Top (ftKB)
2,725.0
Set Depth (ftKB)
8,948.2
Set Depth (TVD) …
6,355.9
Wt/Len (l…
26.00
Grade
J-55
Top Thread
BTC
Casing Description
L1-03 Liner
OD (in)
2 3/8
ID (in)
1.99
Top (ftKB)
8,637.3
Set Depth (ftKB)
11,717.0
Set Depth (TVD) … Wt/Len (l…
4.60
Grade
L-80
Top Thread
STL
Liner Details
Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com
Nominal ID
(in)
8,637.3 6,148.8 48.22 SBR (Seal Bore
Receptacle)
NSAK 225 Sealbore Deployment Sleeve (PBR) 2.250
8,710.6 6,197.7 48.25 Swell Packer Swell Packer - Reactive 1.686
9,576.6 Deployment
Sleeve
NSAK 350-238 OH Permanent QCLL 1.920
10,831.5 Deployment
Sleeve
NSAK 350-238 OH Permanent QCLL 1.920
Casing Description
L1-01 Liner
OD (in)
2 3/8
ID (in)
1.99
Top (ftKB)
8,738.7
Set Depth (ftKB)
10,987.0
Set Depth (TVD) … Wt/Len (l…
4.60
Grade
L-80
Top Thread
STL
Liner Details
Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com
Nominal ID
(in)
8,738.7 6,216.4 48.25 Aluminum Billet Aluminum Liner Top Billet 1.920
9,692.9 Deployment
Sleeve
Shorty deployment sleeve 1.920
Casing Description
L1 Liner
OD (in)
2 3/8
ID (in)
1.99
Top (ftKB)
9,306.9
Set Depth (ftKB)
10,975.0
Set Depth (TVD) … Wt/Len (l…
4.60
Grade
L-80
Top Thread
STL
Liner Details
Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com
Nominal ID
(in)
9,306.9 Aluminum Billet Liner top billet - Northern Solutions 1.920
Casing Description
L1-02 Liner
OD (in)
2 3/8
ID (in)
1.99
Top (ftKB)
9,598.7
Set Depth (ftKB)
11,717.0
Set Depth (TVD) … Wt/Len (l…
4.60
Grade
L-80
Top Thread
STL
Liner Details
Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com
Nominal ID
(in)
9,598.7 Aluminum Billet Aluminum Liner Top Billet 1.920
Tubing Strings
Tubing Description
Tubing – Production
String Ma…
3 1/2
ID (in)
2.99
Top (ftKB)
33.0
Set Depth (ft…
8,760.8
Set Depth (TVD) (…
6,231.1
Wt (lb/ft)
9.30
Grade
L80
Top Connection
EUE
Completion Details
Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Nominal ID (in)
OD Nominal
(in) Make Model
33.0 33.0 0.03 Hanger 3.910 4.500 FMC TC-1A
474.9 474.9 0.29 Nipple - X 2.813 3.770 HES X
2,942.3 2,492.7 43.17 Mandrel – GAS LIFT 2.926 5.679 SLB MMG
4,888.2 3,754.9 50.87 Mandrel – GAS LIFT 2.926 5.679 SLB MMG
6,190.7 4,598.3 49.20 Mandrel – GAS LIFT 2.926 5.679 SLB MMG
7,176.2 5,214.1 51.94 Mandrel – GAS LIFT 2.926 5.679 SLB MMG
7,887.1 5,661.0 50.41 Mandrel – GAS LIFT 2.926 5.679 SLB MMG
8,437.0 6,016.3 48.98 Mandrel – GAS LIFT 2.926 5.679 SLB MMG
8,503.6 6,060.1 48.81 Packer 2.885 6.276 SLB Bluepack
max
8,615.6 6,134.4 48.21 Nipple - X 2.813 3.770 HES "X"
8,663.0 6,166.0 48.23 Wedge Assembly 2.992 5.905 Northern
solutions
8,677.0 6,175.3 48.24 Nipple - X 2.813 4.500 Northern
Solutions
"X"
8,682.8 6,179.2 48.24 Wedge Assembly 2.992 5.905 Northern
solutions
8,696.8 6,188.5 48.25 Nipple - X 2.813 4.500 Northern
Solutions
"X"
8,739.0 6,216.6 48.25 Sleeve - Frac 2.770 4.490 Baker Huges
8,760.3 6,230.8 48.25 Wireline Guide 3.012 4.500 Halliburton
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top
(ftKB)
Top
(TVD)
(ftKB)
Top Incl
(°) Des Com Run Date ID (in) SN
8,626.4 6,141.6 48.21 PACKOFF Set NSAK Mono-Pak LTP. Set into liner top
@ 8637' RKB. (Drawing of LTP in
attachments)
2/17/2022 1.781 A22427201
8,646.0 6,154.7 48.22 WHIPSTOCK TOWS set at 8646', HS 1/28/2022 0.100
8,666.0 6,168.0 48.23 WHIPSTOCK WS set on X-Lock @ 8677 1/23/2022 0.100
8,677.0 6,175.3 48.24 CHOKE 2.813" X-LOCK W/ FLOW THRU SUB (1.75"
ID / 18" OAL)
1/23/2022 1.780
3M-05, 3/8/2022 9:29:46 AM
Vertical schematic (actual)
L1-03 Liner; 8,637.3-11,717.0
L1-02 Liner; 9,598.7-11,717.0
L1-01 Liner; 8,738.7-10,987.0
L1 Liner; 9,306.9-10,975.0
PRODUCTION ORIGINAL;
2,725.0-8,948.2
FISH; 8,807.0
FISH; 8,801.0
Sleeve - Frac; 8,739.0
IPERF; 8,736.0-8,739.0
IPERF; 8,728.0-8,731.0
IPERF; 8,686.0-8,718.0
IPERF; 8,682.0-8,720.0
CHOKE; 8,697.0
Nipple - X; 8,696.8
WHIPSTOCK; 8,685.0
OBSTRUCTION; 8,690.0
FISH; 8,685.0
CHOKE; 8,677.0
Nipple - X; 8,677.0
IPERF; 8,672.0-8,676.0
RPERF; 8,666.0-8,682.0
WHIPSTOCK; 8,666.0
WHIPSTOCK; 8,646.0
OTHER; 8,637.0
PACKOFF; 8,626.4
Nipple - X; 8,615.6
Packer; 8,503.6
Mandrel – GAS LIFT; 8,436.9
Mandrel – GAS LIFT; 7,887.1
Mandrel – GAS LIFT; 7,176.2
Mandrel – GAS LIFT; 6,190.7
Mandrel – GAS LIFT; 4,888.2
SURFACE; 37.0-4,351.4
Mandrel – GAS LIFT; 2,942.3
7" Tie-Back Patch; 42.2-2,725.0
Production String 1 Cement;
34.0 ftKB
Nipple - X; 474.9
CONDUCTOR; 38.0-115.0
Hanger; 33.0
KUP PROD
KB-Grd (ft)
39.61
Rig Release Date
3/24/1987
3M-05
...
TD
Act Btm (ftKB)
9,110.0
Well Attributes
Field Name
KUPARUK RIVER UNIT
Wellbore API/UWI
500292170600
Wellbore Status
PROD
Max Angle & MD
Incl (°)
52.78
MD (ftKB)
7,100.00
WELLNAME WELLBORE3M-05
Annotation
Last WO:
End Date
7/10/1992
H2S (ppm)
240
Date
12/10/2015
Comment
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top
(ftKB)
Top
(TVD)
(ftKB)
Top Incl
(°) Des Com Run Date ID (in) SN
8,685.0 6,180.6 48.25 WHIPSTOCK Set on X-Lock TOWS 8685' 1/22/2022 0.000
8,685.0 6,180.6 48.25 FISH 2.80 Dimond Speed Mill sitting on wipstock
tray @ 8685'
1/22/2022 1.000
8,690.0 6,184.0 48.25 OBSTRUCTION NOTE: TIGHT SPOT BETWEEN LOWER
TWO X- NIPPLES WHEN RUNNING LONG
ASSEMBLIES (ABLE TO DRIFT 2.80" WITH
NO ANOMALIES)
1/14/2022 2.992
8,697.0 6,188.6 48.25 CHOKE 2.813" X-LOCK W/ FLOW THRU SUB (1.75"
ID / 18" OAL)
1/14/2022 1.750
8,801.0 6,257.9 48.24 FISH 1 1/2" GLV Empty Pocket; Fell downhole
7/27/1992
7/27/1992 0.000
8,807.0 6,261.9 48.24 FISH 1 1/2" OV Empty Pocket; Fell to Rathole
4/11/1993
4/11/1993 0.000
Mandrel Inserts
St
ati
on
N
o/Top (ftKB)
Top (TVD)
(ftKB)
Top
Incl (°) Make Model OD (in) Serv
Valve
Type
Latch
Type
Port Size
(in)
TRO Run
(psi) Run Date Com
6 2,942.3 2,492.7 43.17 Camco MMG 1 1/2 GLV RK 1,260.0 1/10/2022
5 4,888.2 3,754.9 50.87 Camco MMG 1 1/2 GLV RK 1,255.0 1/10/2022
4 6,190.7 4,598.3 49.20 Camco MMG 1 1/2 OV RK 0.250 1/13/2022
3 7,176.2 5,214.1 51.94 Camco MMG 1 1/2 DMY RK 1/10/2022
2 7,887.1 5,661.0 50.41 Camco MMG 1 1/2 DMY RK 1/10/2022
1 8,437.0 6,016.3 48.98 Camco MMG 1 1/2 DMY RK 1/10/2022
Perforations & Slots
Top (ftKB) Btm (ftKB)
Top (TVD)
(ftKB)
Btm (TVD)
(ftKB) Linked Zone Date
Shot
Dens
(shots/ft
)Type Com
8,666.0 8,682.0 6,168.0 6,178.6 A-2, 3M-05 3/19/1992 6.0 RPERF 2 1/8" Dyna Strip, 0 deg. ph
8,672.0 8,676.0 6,172.0 6,174.6 A-2, 3M-05 7/5/1987 1.0 IPERF 4" Csg Gun, 120 deg. ph
8,682.0 8,720.0 6,178.6 6,203.9 A-2, A-1, 3M-05 3/19/1992 6.0 IPERF 2 1/8" Dyna Strip, 0 deg. ph
8,686.0 8,718.0 6,181.3 6,202.6 A-1, 3M-05 7/5/1987 1.0 IPERF 4" Csg Gun, 120 deg. ph
8,728.0 8,731.0 6,209.3 6,211.3 A-1, 3M-05 7/5/1987 1.0 IPERF 4" Csg Gun, 120 deg. ph
8,736.0 8,739.0 6,214.6 6,216.6 A-1, 3M-05 7/5/1987 1.0 IPERF 4" Csg Gun, 120 deg. ph
Notes: General & Safety
End Date Annotation
7/15/2009 NOTE: IA x OA COMMUNICATION
3M-05, 3/8/2022 9:29:47 AM
Vertical schematic (actual)
L1-03 Liner; 8,637.3-11,717.0
L1-02 Liner; 9,598.7-11,717.0
L1-01 Liner; 8,738.7-10,987.0
L1 Liner; 9,306.9-10,975.0
PRODUCTION ORIGINAL;
2,725.0-8,948.2
FISH; 8,807.0
FISH; 8,801.0
Sleeve - Frac; 8,739.0
IPERF; 8,736.0-8,739.0
IPERF; 8,728.0-8,731.0
IPERF; 8,686.0-8,718.0
IPERF; 8,682.0-8,720.0
CHOKE; 8,697.0
Nipple - X; 8,696.8
WHIPSTOCK; 8,685.0
OBSTRUCTION; 8,690.0
FISH; 8,685.0
CHOKE; 8,677.0
Nipple - X; 8,677.0
IPERF; 8,672.0-8,676.0
RPERF; 8,666.0-8,682.0
WHIPSTOCK; 8,666.0
WHIPSTOCK; 8,646.0
OTHER; 8,637.0
PACKOFF; 8,626.4
Nipple - X; 8,615.6
Packer; 8,503.6
Mandrel – GAS LIFT; 8,436.9
Mandrel – GAS LIFT; 7,887.1
Mandrel – GAS LIFT; 7,176.2
Mandrel – GAS LIFT; 6,190.7
Mandrel – GAS LIFT; 4,888.2
SURFACE; 37.0-4,351.4
Mandrel – GAS LIFT; 2,942.3
7" Tie-Back Patch; 42.2-2,725.0
Production String 1 Cement;
34.0 ftKB
Nipple - X; 474.9
CONDUCTOR; 38.0-115.0
Hanger; 33.0
KUP PROD 3M-05
...
WELLNAME WELLBORE3M-05
Page 1/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/19/2022
00:00
1/19/2022
01:00
1.00 MIRU, MOVE NUND P Nipple down bop's 0.0 0.0
1/19/2022
01:00
1/19/2022
04:00
3.00 MIRU, MOVE DMOB P Rig down checklist // Prep rig for move //
TH rig down tiger tank line and remove
tiger tank // Prep shop and HWH for
move //
0.0 0.0
1/19/2022
04:00
1/19/2022
07:00
3.00 MIRU, MOVE DMOB P Continue working checklists. Trucks
requested ol location @ 0700
0.0 0.0
1/19/2022
07:00
1/19/2022
10:12
3.20 MIRU, MOVE DMOB T Trucks arrive on location @ 9:15. Sows
not configured properly to load shop.
Weights loaded onto sows with long
winch cables
0.0 0.0
1/19/2022
10:12
1/19/2022
11:42
1.50 MIRU, MOVE DMOB P PJSM W /NES for rig move, Hook up
pits and pull off
0.0 0.0
1/19/2022
11:42
1/19/2022
13:00
1.30 MIRU, MOVE DMOB T Hook up to sow to sub. Having
tranmission issues with NES SOW.
0.0 0.0
1/19/2022
13:00
1/19/2022
14:00
1.00 MIRU, MOVE DMOB P Pull Sub off well, Rig down cellar
herculite and berming. Pull around pad
past 7ES satalite camp. Hook up Jeeps
on modules
0.0
1/19/2022
14:00
1/19/2022
16:30
2.50 MIRU, MOVE MOB P Leave 1L pad for 3M 0.0 0.0
1/19/2022
16:30
1/19/2022
21:00
4.50 MIRU, MOVE MOB T Stand by for NES to fix brake problem
on sow
0.0 0.0
1/19/2022
21:00
1/19/2022
23:00
2.00 MIRU, MOVE MOB P Continue move to CPF3 0.0 0.0
1/19/2022
23:00
1/20/2022
00:00
1.00 MIRU, MOVE MOB T NES truck on pits failed. Swap out sow. 0.0 0.0
1/20/2022
00:00
1/20/2022
02:00
2.00 MIRU, MOVE MOB P Continue moce CPF 3 to 3M-05 0.0 0.0
1/20/2022
02:00
1/20/2022
02:30
0.50 MIRU, MOVE MOB P Modules on location, Remove jeeps 0.0 0.0
1/20/2022
02:30
1/20/2022
05:00
2.50 MIRU, MOVE MOB P Prep cellar area. Shovel snow from
around well. Lay down herculite, Spot
sub over well. Lay down matting boards
0.0 0.0
1/20/2022
05:00
1/20/2022
07:00
2.00 MIRU, MOVE MOB P Sub in place. Lay down matts for pits.
Spot pits. Lay rest of matts. Set down
sub
0.0 0.0
1/20/2022
07:00
1/20/2022
12:00
5.00 MIRU, MOVE RURD P PJSM. Safe out outside rig. set stairs
and landings. R/U PUTZ.
0.0 0.0
1/20/2022
12:00
1/20/2022
15:00
3.00 MIRU, WHDBOP NUND T Go to lower stack for nipple up. Unable
to get draw works to move, Trouble
shoot. Lift stack off blocke with cellar
bridge cranes. Nipple up stack
0.0 0.0
1/20/2022
15:00
1/20/2022
16:00
1.00 MIRU, WHDBOP NUND P Nipple up, fill stack 0.0 0.0
1/20/2022
16:00
1/21/2022
00:00
8.00 MIRU, WHDBOP BOPE P Start full BOPE test. Test witnessed by
Guy Cook, AOGCC 250/5000
Ann. 250/2500
0.0 0.0
1/21/2022
00:00
1/21/2022
02:00
2.00 MIRU, WHDBOP BOPE P Start full BOPE test. Test witnessed by
Guy Cook, AOGCC 250/5000
Ann. 250/2500
0.0 0.0
1/21/2022
02:00
1/21/2022
05:00
3.00 MIRU, WHDBOP CTOP P Grease valves , extended drawdown
test , valve alignments, clean up test
joint ,
0.0 0.0
1/21/2022
05:00
1/21/2022
09:00
4.00 MIRU, WHDBOP CTOP P Pressure test PDL's and tiger tank line 0.0 0.0
1/21/2022
09:00
1/21/2022
10:00
1.00 SLOT, WELLPR BHAH P PJSM, Bring up Northern Soulotions
whipstock tray Put in well
0.0 0.0
1/21/2022
10:00
1/21/2022
12:18
2.30 PROD1, WHPST BHAH P Pressure deploy BHA #1 NS Whipstock.
Skid injector to floor. Install floats in
UQC. M/U to coiltrack and surface test,
Strip on well
0.0 73.5
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 2/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/21/2022
12:18
1/21/2022
14:12
1.90 PROD1, WHPST TRIP P Trip in well BHA #1, Min rate on
seawater
73.5 8,500.0
1/21/2022
14:12
1/21/2022
14:18
0.10 PROD1, WHPST DLOG P Log K1 for tie in, Correct -6', PUW=35K,
Close EDC
8,500.0 8,532.0
1/21/2022
14:18
1/21/2022
14:30
0.20 PROD1, WHPST TRIP P Continue in well. RIW=15K. 8,532.0 8,696.0
1/21/2022
14:30
1/21/2022
14:48
0.30 PROD1, WHPST TRIP P Set down 8697' with 5K down weight.
Pick up to 35K, RIH to 1000 LBS
DHWOB.Bring pump online See tool
shift @ 3300. DHWOB=7K. PUH off
tray, PUW=35K
8,696.0 8,680.0
1/21/2022
14:48
1/21/2022
16:48
2.00 PROD1, WHPST TRIP P Open EDC. Flush well bore with
seawater, 15 BBls out POOH
8,680.0 70.0
1/21/2022
16:48
1/21/2022
18:18
1.50 PROD1, WHPST PULD P Pressure Un-deploy BHA# 1 WS setting
tool
70.0 0.0
1/21/2022
18:18
1/21/2022
20:25
2.13 PROD1, WHPST PULD P Pressure Deploy BHA# 2 Windown mill
assembly // X-treme .6° AKO w/ NS
string reamer and window mill
0.0 75.0
1/21/2022
20:25
1/21/2022
22:07
1.70 PROD1, WHPST TRIP P Tag up set counters // RIH w/ BHA# 2 X
-treme .6° AKO w/ ns string reamer and
windwo mill //
75.0 8,490.0
1/21/2022
22:07
1/21/2022
22:19
0.20 PROD1, WHPST DLOG P Tie in K1 for -6' correction 8,490.0 8,532.0
1/21/2022
22:19
1/21/2022
22:49
0.50 PROD1, WHPST CIRC P Circulate out seawater 8,665.0 8,665.0
1/21/2022
22:49
1/21/2022
23:00
0.17 PROD1, WHPST TRIP P Dry tag WS @ 8686 // PU Wt. 34K 8,532.0 8,685.0
1/21/2022
23:00
1/22/2022
00:00
1.00 PROD1, WHPST CTOP T Stalled in window // became bit stuck //
pulled up to 45K after consulting town
and popped free // Started pumps and
stalled @ 8678' // Picked up clean and
tied in //
8,686.0 8,686.0
1/22/2022
00:00
1/22/2022
02:06
2.10 PROD1, WHPST MILL P Bring pumps to rate 1.8 3800 psi 520
diff ann 3715 // Work slowly down to
8685.21' WOB .21
OBM 1.8 // 3900 // 518 1'/hr Milled to
8686.73 Stalled and got bit stuck
8,686.0 8,686.0
1/22/2022
02:06
1/22/2022
02:18
0.20 PROD1, WHPST CTOP T Picked up pulled -9 , push down and
pump popped free // picked up and hung
up in x-nipple @ 8677 pull -9k , run
down and popped free picked up clean
8,686.0 8,686.0
1/22/2022
02:18
1/22/2022
03:48
1.50 PROD1, WHPST WAIT T Wait for decision from engineers 8,686.0 8,250.0
1/22/2022
03:48
1/22/2022
05:36
1.80 PROD1, WHPST TRIP T POOH for caliper run 8,250.0 75.0
1/22/2022
05:36
1/22/2022
07:00
1.40 PROD1, WHPST BHAH T At surface, tag up abd space out, PUD
BHA #2, BHA 2 out without NS long
shank window mill
75.0 0.0
1/22/2022
07:00
1/22/2022
10:00
3.00 PROD1, WHPST WAIT T Consult with town team Formulate plan
forward. S/B for slickline unit
0.0 0.0
1/22/2022
10:00
1/22/2022
14:30
4.50 PROD1, WHPST SLKL T Slickline on location, PJSM. R/U
slickline unit on rig
0.0 0.0
1/22/2022
14:30
1/22/2022
19:00
4.50 PROD1, WHPST SLKL T M/U 2.75" LIB, PT Lubricator to 3K, Trip
in well. Set down @ 8667 SLM // RIH
with 2.5 LIB set down at 8677 SLM pull
out of hole with LIB send pics to town for
plan forward
0.0 0.0
1/22/2022
19:00
1/22/2022
19:48
0.80 PROD1, WHPST WAIT T Wait for plan forward 0.0 0.0
1/22/2022
19:48
1/22/2022
21:48
2.00 PROD1, WHPST SLKL T Run blind on slick line to jar down on
mill
0.0 0.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 3/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/22/2022
21:48
1/23/2022
00:00
2.20 PROD1, WHPST SLKL T Run memory caliper on slick line 0.0 0.0
1/23/2022
00:00
1/23/2022
01:30
1.50 PROD1, WHPST SLKL T Run memory caliper on slick line 0.0 0.0
1/23/2022
01:30
1/23/2022
04:00
2.50 PROD1, WHPST SLKL T Run x-lock on slick line set in X-nipple
@ 8677'
0.0 0.0
1/23/2022
04:00
1/23/2022
06:00
2.00 PROD1, WHPST SLKL T Run check set to confirm s-lock is set on
slick line
0.0 0.0
1/23/2022
06:00
1/23/2022
07:30
1.50 PROD1, WHPST SLKL T Check set on surface, sheared pin. Lock
is shut. R/D Slick line unit
0.0 0.0
1/23/2022
07:30
1/23/2022
09:00
1.50 PROD1, WHPST WPST T PJSM, Run Northern whipstock tray,
BHA #3
0.0 73.5
1/23/2022
09:00
1/23/2022
11:00
2.00 PROD1, WHPST TRIP T RIH BHA #3 73.5 8,500.0
1/23/2022
11:00
1/23/2022
11:12
0.20 PROD1, WHPST DLOG T Log K1 for -8' correction, PUW=32K,
Shut EDC
8,500.0 8,677.0
1/23/2022
11:12
1/23/2022
11:30
0.30 PROD1, WHPST TRIP T Continue in well, Set down @ 8677.
Pick up to neutral weight. Pumps online.
See tool shift @ 3800 PSI. PUW=31K,
Top of whipstock=8666
8,677.0 8,677.0
1/23/2022
11:30
1/23/2022
13:12
1.70 PROD1, WHPST TRIP T POOH with whipstock setting tools, BHA
#3
8,677.0 69.0
1/23/2022
13:12
1/23/2022
14:24
1.20 PROD1, WHPST BHAH T At surface, tag up and space out. PJSM
PUD BHA #3
69.0 0.0
1/23/2022
14:24
1/23/2022
15:30
1.10 PROD1, WHPST BHAH T PJSM. PD BHA #4 window milling BHA.
Tag up. Set depth counters
0.0 74.7
1/23/2022
15:30
1/23/2022
17:48
2.30 PROD1, WHPST TRIP T RIH, BHA #4 Tie in K1 -7' correction //
Dry tag 8667'
74.7 8,667.0
1/23/2022
17:48
1/24/2022
00:00
6.20 PROD1, WHPST MILL P Mill window F/ 8665.8' T/8668.54
1.8 bpm // 4000 pp // diff 720 Ann 3701
8,667.0 8,668.5
1/24/2022
00:00
1/24/2022
07:42
7.70 PROD1, WHPST MILL P Mill window F/ 8668.54' T/8669
1.8 bpm // 4200 pp // diff 720 Ann 3667
8,668.5 8,669.5
1/24/2022
07:42
1/24/2022
09:30
1.80 PROD1, WHPST MILL P P/U to check weight on bit Pressure.
Stalled at top of window 8665'. Popped
free Ream back down trat area 2 FPM
8,669.5 8,670.0
1/24/2022
09:30
1/24/2022
15:30
6.00 PROD1, WHPST MILL P 8670, Mill, 1.8 BPM @ 3949 PSI FS.
DHWOB=3.3K. Very low ROP. Get
metal and resin pieces in sample. Try
different WOB minor pump rate
cheangers. Confer with town. Little to no
progress
8,670.0 8,670.4
1/24/2022
15:30
1/24/2022
15:54
0.40 PROD1, WHPST MILL P Pull wiper / ream to top of tray,
PUW=31K, Ream down 1 FPM clean
8,670.4 8,670.4
1/24/2022
15:54
1/24/2022
16:30
0.60 PROD1, WHPST MILL P Back on bottom 1.8 BPM @ 3993 PSI
FS
8,670.4 8,670.0
1/24/2022
16:30
1/24/2022
18:24
1.90 PROD1, WHPST TRIP T POOH BHA #4. PUW=30K 8,670.0 63.0
1/24/2022
18:24
1/24/2022
20:18
1.90 PROD1, WHPST BHAH T Tag up space out. PJSM PUD BHA #4
Mill and string reamer. Mill and reamer
out at 2.80 No Go. Motor felt good
63.0 0.0
1/24/2022
20:18
1/24/2022
21:18
1.00 PROD1, WHPST BHAH T M/U BHA #5 Window milling BHA with
new window mill, different string reamer.
and replacement motor. AKO=.6.
Pressure deploy. Make up to coil and
surface test tool - Good. Strip injector on
well. Tag set counters
0.0 74.3
1/24/2022
21:18
1/24/2022
22:54
1.60 PROD1, WHPST TRIP T RIH BHA #5 74.3 8,500.0
1/24/2022
22:54
1/24/2022
23:12
0.30 PROD1, WHPST DLOG T Log K1 for -6' correction, Close EDC,
PUW=32K
8,500.0 8,529.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 4/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/24/2022
23:12
1/24/2022
23:24
0.20 PROD1, WHPST TRIP T RIH to mill window. Start rolling pump
1.82 BPM @ 3893 PSI FS, Diff press
500 PSI,
8,529.0 8,668.0
1/24/2022
23:24
1/25/2022
00:00
0.60 PROD1, WHPST MILL T Torgue up @ 8668 Get TF back to HS,
1.8 BPM # 3893 PSI FS. See WOB @
8671.4 get DHWOB. Keep rolling in to
8673.1. Stop with 3K WOB, 700 PSI diff.
Set brake. watch for mill off
8,668.0 8,672.0
1/25/2022
00:00
1/25/2022
08:30
8.50 PROD1, WHPST MILL T Mill ahead on window
PP 4000 Diff 615 Ann 3718
8,672.0 8,673.6
1/25/2022
08:30
1/25/2022
09:00
0.50 PROD1, WHPST WPRT T Wiper 15' 8,673.6 8,673.6
1/25/2022
09:00
1/25/2022
16:00
7.00 PROD1, WHPST MILL T OBM
1.8 bpm // 3890 FS // 250 WHP // 473
Diff // 3709 Ann // Free Spin Numbers
ROP - 0.5' / 7 hrs - 0.7 ft/hr
Started to see drill off @ 8674.21 @
16:42
8,673.6 8,674.1
1/25/2022
16:00
1/25/2022
21:36
5.60 PROD1, WHPST MILL T OBM - IA 92 psi, OA 5 psi, WH 266 psi,
CT 4080 psi @ 1.84 bpm in / 1.72 bpm
out. BHP 3719 psi, free spin diff 473
psi.
Pumped 5x5 and it seemed as if we saw
some movement and motor work. Tried
3 more sweeps with limited to no real
change.
8,674.1 8,674.5
1/25/2022
21:36
1/25/2022
21:48
0.20 PROD1, WHPST TRIP T PU Wt 32 k lbs, Park above WS - open
EDC, PUH
8,674.5 8,500.0
1/25/2022
21:48
1/25/2022
21:54
0.10 PROD1, WHPST DLOG T Tie into K1 for zero correction 8,500.0 8,528.0
1/25/2022
21:54
1/25/2022
23:24
1.50 PROD1, WHPST TRIP T POOH w open EDC @ 2.0 bpm in and d
1.62 bpm out
Preload PDL W BHA #5 upper in DS
PDL.
8,528.0 64.5
1/25/2022
23:24
1/26/2022
00:00
0.60 PROD1, WHPST PULD T Tag up, space out, PUD BHA #5 64.5 64.5
1/26/2022
00:00
1/26/2022
00:42
0.70 PROD1, WHPST PULD T Continue to PUD BHA #5
Speed mill 2.80" go, 2.79" no
Reamer 2.81" go, 2.80" no
64.5 0.0
1/26/2022
00:42
1/26/2022
02:30
1.80 PROD1, WHPST PULD T PD BHA #5 - window milling assembly -
note dropped window milling pup and
added agitator, running string mill and
speed mill from first attempt at WS #2 -
BHA #4.
0.0 69.4
1/26/2022
02:30
1/26/2022
04:18
1.80 PROD1, WHPST TRIP T Bump up, set counters, RIH with BHA
#6 window milling assembly + agitator,
park close EDC, shallow test agitator.
69.4 8,500.0
1/26/2022
04:18
1/26/2022
04:30
0.20 PROD1, WHPST DLOG T Tie into the K1 for -6' correction. 8,500.0 8,520.0
1/26/2022
04:30
1/26/2022
04:42
0.20 PROD1, WHPST TRIP T Continue in hole 8,520.0 8,673.8
1/26/2022
04:42
1/26/2022
07:42
3.00 PROD1, WHPST MILL T IA 0 psi, OA 1 psi, WH 336 psi, CT 4235
psi @ 1.84 bpm in 1.67 out, BHP 3747
psi, Free spin diff 856, RIH Wt 14.14 k
lbs, OBM
Tag 8673.86'
8,673.8 8,673.8
1/26/2022
07:42
1/26/2022
09:30
1.80 PROD1, WHPST TRIP T POOH for new mill 8,673.8 70.0
1/26/2022
09:30
1/26/2022
11:00
1.50 PROD1, WHPST PULD T PUD bha 6 and lay down 70.0 0.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 5/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/26/2022
11:00
1/26/2022
12:12
1.20 PROD1, WHPST PULD T PD BHA# 7 .6° AKO w/ NS hybrid mill 0.0 70.0
1/26/2022
12:12
1/26/2022
14:42
2.50 PROD1, WHPST PULD T RIH w/ BHA # 7 // Tie in K1 for -6.5
correction // close EDC // PU Wt. 32K //
Tag @
70.0 8,674.0
1/26/2022
14:42
1/26/2022
21:24
6.70 PROD1, WHPST MILL T IA 0 psi, OA 1 psi, WH 278 psi, CT 3955
psi @ 1.80 bpm in 1.71 out, BHP 3789
psi, Free spin diff 500, RIH Wt 14.14 k
lbs, OBM
Tag 8673.86'
Stack WOB up to 4 k with little to no
respons in motor work. Send two
beaded sweeps with little respons in
motor work of WOB. PU ~ 8 k CT wt
with no change in WOB or motor work. -
BHA appears to be in a bind somewher
above the ream/mill and below the
Drilling Performance Sub
8,674.0 8,674.0
1/26/2022
21:24
1/26/2022
21:42
0.30 PROD1, WHPST DLOG T PU Wt 30 k lbs, PUH and tie into the K1
for +1' correction - pinched choke and
pushed away ~ 1.5 bbls to ensure we
can bulhead methanol during camera
log.
8,674.0 8,531.0
1/26/2022
21:42
1/26/2022
22:00
0.30 PROD1, WHPST DLOG T Park at 8574.75' and paint yellow flag in
anticipation of camera run. Open EDC
8,531.0 8,574.8
1/26/2022
22:00
1/26/2022
23:24
1.40 PROD1, WHPST TRIP T POOH W BHA #7, pumping 2 BPM 8,574.8 74.0
1/26/2022
23:24
1/27/2022
00:00
0.60 PROD1, WHPST PULD T Bump up, space out, PUD BHA # 7
milling assembly.
74.0 74.0
1/27/2022
00:00
1/27/2022
01:24
1.40 PROD1, WHPST PULD T Continue to PUD BHA #7, Fresh water
and MetOH trucks on location. Camera
XO and shroud on location.
74.0 0.0
1/27/2022
01:24
1/27/2022
02:48
1.40 PROD1, WHPST RURD T Camera man on location. Rig up
camera. LRS on location, spot up and
rig up tro MetOH tanker / customer line.
0.0 0.0
1/27/2022
02:48
1/27/2022
06:00
3.20 PROD1, WHPST WAIT T Camera hand round tripping to
deadhorse for female to female BCN
connection.
0.0 0.0
1/27/2022
06:00
1/27/2022
07:00
1.00 PROD1, WHPST PULD T PU and PD BHA #8 - camera assembly.
Test camera at surface
0.0 16.0
1/27/2022
07:00
1/27/2022
11:15
4.25 PROD1, WHPST WAIT T Trouble shoot camera 16.0 16.0
1/27/2022
11:15
1/27/2022
13:21
2.10 PROD1, WHPST TRIP T Tag up // Pressure up // open master
and RIH with camera assembly // Tie in
EOP flag -.22' correction
16.0 8,616.0
1/27/2022
13:21
1/27/2022
14:21
1.00 PROD1, WHPST DISP T Circulate clean fresh water into well
bore for camera
8,616.0 8,616.0
1/27/2022
14:21
1/27/2022
16:21
2.00 PROD1, WHPST ELOG T Video log well 8,616.0 8,673.0
1/27/2022
16:21
1/27/2022
17:21
1.00 PROD1, WHPST CIRC T Circulate well to Milling fluid 8,673.0 8,615.0
1/27/2022
17:21
1/27/2022
18:57
1.60 PROD1, WHPST TRIP T POOH chasing water out of hole. 8,615.0 16.0
1/27/2022
18:57
1/27/2022
20:33
1.60 PROD1, WHPST PULD T Lay down BHA #8, camera run, over a
closed valve.
16.0 0.0
1/27/2022
20:33
1/27/2022
21:03
0.50 PROD1, WHPST SVRG T Service injector 0.0 0.0
1/27/2022
21:03
1/27/2022
22:21
1.30 PROD1, WHPST PULD T PU and PD BHA #9 - Baker 3.5" XL
whipstock.
0.0 72.9
1/27/2022
22:21
1/28/2022
00:00
1.65 PROD1, WHPST TRIP T RIH W BOT whipstock , EDC open,
counter issue,
72.9 7,562.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 6/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/28/2022
00:00
1/28/2022
00:12
0.20 PROD1, WHPST TRIP T RIH W BOT whipstock , EDC open,
counter issue,
7,562.0 8,500.0
1/28/2022
00:12
1/28/2022
00:18
0.10 PROD1, WHPST DLOG T Tie into the K1 for a -7' correction.
Close EDC. PU Wt 30 k lbs,
8,500.0 8,518.0
1/28/2022
00:18
1/28/2022
00:36
0.30 PROD1, WHPST WPST T Continue to RIH to set depth bit dept
8656.52' PU to 28 k lbs. Tray oriented
HS. CT Wt 24.48 k lbs, WOB 0.15.
Online w pump down the coil. WOB to
4.27 k lbs, Shear at 4462 psi. PU to
WOB at 1.5 k, set down 3 k lbs. Good
set!
8,518.0 8,656.0
1/28/2022
00:36
1/28/2022
02:18
1.70 PROD1, WHPST TRIP T PUH, park, open EDC POOH. 8,656.0 62.0
1/28/2022
02:18
1/28/2022
03:48
1.50 PROD1, WHPST PULD T PUD BHA # 9, whipstock setting
assembly.
62.0 0.0
1/28/2022
03:48
1/28/2022
05:18
1.50 PROD1, WHPST PULD T PD BHA # 10, window milling assembly.
BHC diamond speed mill and reamer.
0.0 74.0
1/28/2022
05:18
1/28/2022
06:48
1.50 PROD1, WHPST TRIP T RIH w BHA #10 74.0 8,500.0
1/28/2022
06:48
1/28/2022
07:00
0.20 PROD1, WHPST DLOG T Tie into the K1 for a 7.5' correction Pu
Wt 31K
Dry Tag WS @ 8646
8,500.0 8,646.0
1/28/2022
07:00
1/28/2022
13:12
6.20 PROD1, WHPST MILL T Mill exit window F/ 8646' T/ 8652'
3.5 exit @ 8649.3'
8,646.0 8,652.0
1/28/2022
13:12
1/28/2022
13:36
0.40 PROD1, WHPST REAM P Perform reaming passes @ HS and dry
drift dry drift good
8,652.0 8,652.0
1/28/2022
13:36
1/28/2022
15:36
2.00 PROD1, WHPST TRIP P POOH for BOP test 8,652.0 70.0
1/28/2022
15:36
1/28/2022
16:42
1.10 PROD1, WHPST PULD P PUD BHA # 10 Window mill assembly 70.0 0.0
1/28/2022
16:42
1/28/2022
16:57
0.25 PROD1, WHPST PULD P Lay down motor and pup jt 0.0 0.0
1/28/2022
16:57
1/28/2022
20:30
3.55 PROD1, WHPST CTOP P Turn coil over to water while jetting the
stack. Pop off, pull checks, stab on, PT
stripperr and inner reel iron to 250/5000
psi - good
0.0 0.0
1/28/2022
20:30
1/28/2022
23:30
3.00 PROD1, WHPST CTOP P Reconfigure, install night cap for shell
test - Crew change, valve check list
grease, valve crew serviced tree and
tangos.
0.0 0.0
1/28/2022
23:30
1/29/2022
00:00
0.50 PROD1, WHPST BOPE P Shell test 250/5000 psi - good - BOP
test, witness waived, Austin McLeod -
AOGCC.
Test 1. Swab 2
0.0 0.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 7/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/29/2022
00:00
1/29/2022
06:30
6.50 PROD1, WHPST BOPE P Test 2. Blind/Shear, BOP TV2, Charlie
4, 5, 8, &12
Test 3. BOP TV 1, Charlie 3, 7, & 11
Test 4. Manual choke D & Super choke
C
Test 5. Romeo 3, Bleeder 3, Tango 2,
Charlie 2, & 10
Test 6. Charlie 1, 9, Bravo 5, and Tango
1 – install TIW test joint
Test 7. Lower 2” pipe slip rams, TIW #1,
Romeo 1, Bleeder 1
Test 8. Annular BOP
Test 9. Upper 2” pipe slip rams, Bravo
6, & 8
Test 10. Bravo 7 – swap out 2” test joint
for 2-3/8”
Test 11. 2-3/8” pipe slip rams, TIW#2 –
check N2 levels, swap to 2” test joint
Test 12. Draw down accumulator.
Koomy pressure, close all record stable
pressure, time to increase 200 psi,
entire recovery time
Test 13. Stab injector and line up to
reverse circulate coil, test inner reel
valve and stripper.
Tested all gas detectors, pits, cellar,
Verified flow alarms - PVT
0.0 0.0
1/29/2022
06:30
1/29/2022
07:30
1.00 PROD1, WHPST CTOP P Rig down test eqipment and prep for
cutting coil connector off // Cut 21' of coil
for flat spot and pitted pipe
0.0 0.0
1/29/2022
07:30
1/29/2022
09:30
2.00 PROD1, WHPST CTOP P Re-head coil and install Baker
Directional upper quick pull test coil
connector to 35K pressure test to 3500
psi
Meg test 70.4 / greater than 2000
Baker Upper quick leaking
0.0 0.0
1/29/2022
09:30
1/29/2022
10:30
1.00 PROD1, WHPST PRTS P Baker to trouble shoot leak in upper
quick
0.0 0.0
1/29/2022
10:30
1/29/2022
11:00
0.50 PROD1, WHPST CIRC P Circulate coil over to milling fluid // blow
down choke
0.0 0.0
1/29/2022
11:00
1/29/2022
11:30
0.50 PROD1, WHPST SFTY P Check valve alignment for pressure
deploy / PJSM for pressure deploy
0.0 0.0
1/29/2022
11:30
1/29/2022
13:00
1.50 PROD1, WHPST PULD P Pressure Deploy BHA# 11 1.25° AKO /
Fat radius mill 2.80
0.0 70.0
1/29/2022
13:00
1/29/2022
15:00
2.00 PROD1, WHPST TRIP P RIH // Tie in K1 for -7.5' correction //
Dry tag WS @
70.0 8,652.0
1/29/2022
15:00
1/29/2022
22:00
7.00 PROD1, WHPST MILL P OBM
Free Spin
1.8 bpm // 4306 pp // Diff 711 // Ann
3766 // WHP 210
Observe drop in WOB & motor work @
8654.8' - mill off
Continue to 8656.25' - Mill 100% out of
7"
Pre load build BHA.
Mill F/ 8652' T/ 8656.25
8,652.0 8,656.3
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 8/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/29/2022
22:00
1/29/2022
23:54
1.90 PROD1, WHPST MILL P Reamer fully out, Start milling ahead
targeting 1.5 k WOB then working up to
2.5k WOB
Derik hand reports seeing dirt on the
shaker. Zero bottoms up, catch sample
for Geo to verify.
OA 4 psi, IA 0 psi, WH 242 psi, CT 4692
psi @ 1.80 bpm. BHP 3783 psi, CT Wt
12.33 k lbs, WOB 1.37 k lbs, ROP 2.9
ft/hr.
* Geo confirms formation in 8657'
sample - C4 with some metal.
* TD Rat hole 8672'
8,656.3 8,672.0
1/29/2022
23:54
1/30/2022
00:00
0.10 PROD1, WHPST REAM P PU Wt 31 k lbs, 10x10 TW sweep timed
out
Start reaming passes
Midnight depth 8,656'
8,672.0 8,656.0
1/30/2022
00:00
1/30/2022
02:00
2.00 PROD1, WHPST REAM P PU Wt 31 k lbs, 10x10 TW sweep timed
out Perform reaming passes @
HS - 50 lbs motor work @ 8650 & 8645'
30R ~50-60 psi motor work 8650.5 and
8645'
30L ~ 34 psi motor work 8560 and 8646'
LS ~ 130 psi motor work 8650 and 8646'
pump additional 5x5 sweep
8,656.3 8,641.0
1/30/2022
02:00
1/30/2022
02:18
0.30 PROD1, WHPST REAM P Dry drift - Clean, Tag TD
* Good window!
8,641.0 8,672.0
1/30/2022
02:18
1/30/2022
03:48
1.50 PROD1, WHPST TRIP P PU Wt 29 k lbs POOH pumping 1.92
bpm, park and open EDCat surface.
8,672.0 74.0
1/30/2022
03:48
1/30/2022
05:24
1.60 PROD1, WHPST TRIP P PUD BHA #11, Window milling
assembly while pumping managed
pressure.
74.0 0.0
1/30/2022
05:24
1/30/2022
06:24
1.00 PROD1, WHPST CIRC P Stab injecter, jet stack, POP off - Crew
change.
0.0 0.0
1/30/2022
06:24
1/30/2022
08:06
1.70 PROD1, DRILL PULD P PJSM // Pick up x-treme 2.3° AKO motor
w/ HCC bit // Pressure Deploy BHA# 12
Build Assembly
0.0 72.0
1/30/2022
08:06
1/30/2022
09:54
1.80 PROD1, DRILL TRIP P Tag up set counters // RIH EDC open
pump min rate //
72.0 8,500.0
1/30/2022
09:54
1/30/2022
10:06
0.20 PROD1, DRILL DLOG P Log K1 for -3.5' correction 8,500.0 8,525.0
1/30/2022
10:06
1/30/2022
10:24
0.30 PROD1, DRILL TRIP P Close EDC // PU Wt. 31K // RIH window
clean
8,525.0 8,672.0
1/30/2022
10:24
1/30/2022
13:42
3.30 PROD1, DRILL DRLG P OBD
1.83 in 1.72 out // pp 4338 // Diff 670 //
Ann 3787 // WHP 282
8,672.0 8,850.0
1/30/2022
13:42
1/30/2022
16:00
2.30 PROD1, DRILL TRIP P POOH for build assembly // jog above
window and open EDC // POOH
Heavy pick ups 8850 - 8700
Multiple pulling heavy at bit -3k DHWOB
stop at 6665 and close EDC
8,850.0 70.0
1/30/2022
16:00
1/30/2022
18:00
2.00 PROD1, DRILL PULD P Tag up // Space out 1.2' // PUD BHA#
12 build assembly
70.0 0.0
1/30/2022
18:00
1/30/2022
18:30
0.50 PROD1, DRILL SVRG P Inspect reel, verify torque on reel hubs. 0.0 0.0
1/30/2022
18:30
1/30/2022
20:30
2.00 PROD1, DRILL PULD P PD BHA # 13, ERD Drilling assembly -
150 hr agitator - 0.6° AKO motor and
HYC A3 bit. Check and replace pack
offs.
0.0 78.2
1/30/2022
20:30
1/30/2022
21:30
1.00 PROD1, DRILL TRIP P Bump up, set counters, RIH 78.2 500.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 9/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/30/2022
21:30
1/30/2022
21:48
0.30 PROD1, DRILL SVRG P Park, inspect and torque saddle clamps,
minimal movement.
500.0 500.0
1/30/2022
21:48
1/30/2022
22:54
1.10 PROD1, DRILL TRIP P Continue to RIH 500.0 8,490.0
1/30/2022
22:54
1/30/2022
23:24
0.50 PROD1, DRILL DLOG P Tie into the K1 for -6' correction. PU Wt
31 k lbs, close EDC
Continue in hole - Window clean -
Log RA tag - 8653
Start new mud down the coil.
8,490.0 8,850.0
1/30/2022
23:24
1/31/2022
00:00
0.60 PROD1, DRILL DRLG P OA 12 psi, IA 0 psi, WH 418 psi, CT
4604 psi @ 1.81 bpm in BHP 3801 psi,
Free spin diff
RIH Wt 12.7, OBD, 11.6 k lbs, 0.8 k lbs,
ROP ~170 ft/hr. Took some gas cut
mud to the tiger tank during mud swap.
* New mud at the bit 8876'
8,850.0 8,890.0
1/31/2022
00:00
1/31/2022
00:42
0.70 PROD1, DRILL DRLG P OBD,
New mud all the way around, bring mud
back inside. PU 32 k lbs
New mud parameters, CT 4472 psi @
1.81 bpm in and 1.79 bpm out, BHP
3824 psi, free spin diff 980 psi.
CT Wt 11.5 k lbs, WOB 1.4 k lbs, Get
driller lined out, start targeting ~2 k
WOB - ROP
8,890.0 8,991.0
1/31/2022
00:42
1/31/2022
01:12
0.50 PROD1, DRILL WPRT P DD computer issue - PU Wt 34 k lbs, 8,991.0 8,991.0
1/31/2022
01:12
1/31/2022
03:30
2.30 PROD1, DRILL DRLG P BOBD - OA 14 psi, IA 0 psi, WH 339 psi,
CT 4847 psi @ 1.81 bpm in and 1.81
bpm out, BHP 3816 psi, Free spin 1087
psi . CT Wt 9.3 k lbs, WOB 2.77 k lbs,
pump 5/5 sweep, PU wt 34 k lbs as
sweep exits,BOBD
ROP over interval drilled 140 ft/hr
8,991.0 9,315.0
1/31/2022
03:30
1/31/2022
04:30
1.00 PROD1, DRILL WPRT P PU Wt 34 k lbs on Geo wiper-
Shelter re-log of build section to verify
high dog legs - no change
Jog while waiting - RBIH
9,315.0 9,315.0
1/31/2022
04:30
1/31/2022
09:54
5.40 PROD1, DRILL DRLG P OA 14 psi, IA 0 psi, WH 359 psi, CT
4634 psi @ 1.85 bpm in and 1.76 bpm
out. BHP 3890 psi, Free spin diff 1004
psi. CT RIH Wt 10.4 k lbs, OBD Ct Wt
6.8 k lbs WOB 2.57, ROP 130 ft/min
9,315.0 9,800.0
1/31/2022
09:54
1/31/2022
10:21
0.45 PROD1, DRILL WPRT P Wiper to 8950' Pumped 5 X 5 sweeps 9,800.0 8,950.0
1/31/2022
10:21
1/31/2022
10:48
0.45 PROD1, DRILL WPRT P Wiper back to bottom stack @ 9415' ,
9500' performed bha wiper RIH to
bottom @ 9800
8,950.0 9,800.0
1/31/2022
10:48
1/31/2022
12:18
1.50 PROD1, DRILL DRLG P BOBD - OA 13 psi , IA 0 psi , WHP 330
psi , CT 4750 psi @ 1.85 bpm in and
1.76 bpm out, BHP 3936, Free spin diff
1084 , CT. WT. 5K lbs, WOB 2.5k PU
WT 37K
Drill F/ 9800 T/ 9962
9,800.0 9,962.0
1/31/2022
12:18
1/31/2022
13:06
0.80 PROD1, DRILL WPRT P PU Wt 37K Geo wiper for tie in // Tie in
RA tag for +5' correction
9,962.0 8,686.0
1/31/2022
13:06
1/31/2022
13:54
0.80 PROD1, DRILL WPRT P Wiper back to bottom T/9962' 8,686.0 9,962.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 10/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/31/2022
13:54
1/31/2022
14:30
0.60 PROD1, DRILL DRLG P BOBD - OA 13 psi , IA 0 psi , WHP 350
psi , CT 4770 psi @ 1.85 bpm in and
1.76 bpm out, BHP 3936, Free spin diff
1084 , CT. WT. 5K lbs, WOB 2.5k PU
WT 37K
Drill F/ 9962 T/ 10020'
9,962.0 10,020.0
1/31/2022
14:30
1/31/2022
18:30
4.00 PROD1, DRILL DRLG T Drilling for data F/ 10020 T/ 10400' 10,020.0 10,400.0
1/31/2022
18:30
1/31/2022
21:00
2.50 PROD1, DRILL TRIP T Pump 5 X 5 sweeps / POOH for
OHAB // PU Wt. 37K // Jog below the
build 2nd 5 X 5 exit the bit
10,400.0 70.0
1/31/2022
21:00
1/31/2022
22:30
1.50 PROD1, DRILL PULD T PJSM // Pressure Un-deploy bha # 13
lateral drilling assembly
70.0 0.0
1/31/2022
22:30
1/31/2022
22:45
0.25 PROD1, DRILL PULD T Blow down and lay down baker houghes
inteq motor and NOV agitator
0.0 0.0
1/31/2022
22:45
2/1/2022
00:00
1.25 PROD1, DRILL PULD T Make up and pick up BOT WS 0.0 0.0
2/1/2022
00:00
2/1/2022
00:36
0.60 PROD1, DRILL PULD T Make up and pick up BOT WS 0.0 72.9
2/1/2022
00:36
2/1/2022
02:18
1.70 PROD1, DRILL TRIP T RIH with BHA #14. - OHAB. 72.9 8,500.0
2/1/2022
02:18
2/1/2022
02:30
0.20 PROD1, DRILL DLOG T Tie into the K1 for a -7' correction. Park,
close EDC. PU Wt 32 klbs.
8,500.0 8,522.6
2/1/2022
02:30
2/1/2022
02:54
0.40 PROD1, DRILL TRIP T Continue to RIH to set depth, Window
clean.
Bit depth 8961.77, PU to 28 k lbs, Slips
oriented 30 °ROHS.
Online w pump - Tool sheared at 4,600
psi, WOB climed to 4 k lbs
PU slightly, RIH and stack 3.2 k lbs on
billet - Good set
8,522.6 8,961.8
2/1/2022
02:54
2/1/2022
04:24
1.50 PROD1, DRILL TRIP T PU Wt 33 klbs -
Pull into cased hole, Park, open EDC
POOH w OHAB setting assembly
8,961.8 72.9
2/1/2022
04:24
2/1/2022
06:06
1.70 PROD1, DRILL PULD T PUD BHA #14, OHAB setting assembly
- Crew change
72.9 0.0
2/1/2022
06:06
2/1/2022
07:42
1.60 PROD1, DRILL PULD T PD BHA # 15 ERD lateral drilling
asembly.
0.0 78.2
2/1/2022
07:42
2/1/2022
09:18
1.60 PROD1, DRILL TRIP T RIH W BHA #15 78.2 8,500.0
2/1/2022
09:18
2/1/2022
09:42
0.40 PROD1, DRILL DLOG T Tie into the K1 for a -7' correction.
Trap pressure and observe.
Pressure stabilized at 3776 psi - sensor
depth 6038.9'
12.05 EMW
8,500.0 8,520.0
2/1/2022
09:42
2/1/2022
10:00
0.30 PROD1, DRILL TRIP T Continue in hole, window clean, dry tag
TOB @ 8950'
PU and set parameters - PU Wt 33 k lbs
8,520.0 8,950.0
2/1/2022
10:00
2/1/2022
14:00
4.00 PROD1, DRILL KOST T OA 11 psi, IA 0 psi, WH 440 psi, CT
4463 pis @ 1.84 bpm in and 1.76 bpm
out. BHP 3899 psi, Fre spin 980 psi,
Sneak up on billet, kiss it, grab a tenth
every 6 minutes, x3 - engage auto drill
at 1Ft/ hr. Increase ROP to 2 ft/hr At
8950.74' Stall at 8,953.42' PU and
restart. drill to 5954.78 at 3 ft/hr, stall
5954.78'. Stall at 5954.98'.
8,949.7 8,970.0
2/1/2022
14:00
2/1/2022
16:48
2.80 PROD1, DRILL DRLG T OA 11, IA 0, WH 282 psi, CT 4796 psi
@ 1.83 bpm, BHP 3864 psi, Free spin
diff 1118 psi.
RIH Wt CT 14.8 k lbs, OBD, CT Wt
Pick ups 34 k lbs
8,970.0 9,544.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 11/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/1/2022
16:48
2/1/2022
17:06
0.30 PROD1, DRILL WPRT T PUH on wiper #1 9,544.0 8,930.0
2/1/2022
17:06
2/1/2022
17:24
0.30 PROD1, DRILL WPRT T Wiper back in hole, RIW 10-12k CTSW 8,930.0 9,544.0
2/1/2022
17:24
2/1/2022
20:36
3.20 PROD1, DRILL DRLG T BOBD, 1.83 bpm/4,691 psi, WHP 235,
BHP 3,907, IA 114, OA 11
Looking for the top @ 92°, found the top
due to slower ROP and Higher Gamma
9,770', Turn down going for 85°, leveling
out and holding 90°
Avg. ROP 145 fph
9,544.0 9,950.0
2/1/2022
20:36
2/1/2022
20:54
0.30 PROD1, DRILL WPRT T WIper up hole, PUW clean 38k CTSW, 9,950.0 9,150.0
2/1/2022
20:54
2/1/2022
21:18
0.40 PROD1, DRILL WPRT T WIper back in hole w/full rate, RIW 8-
10k CTSW
*** Note: current Mud System DS
1.75%, prep pits for mud swap
9,150.0 9,950.0
2/1/2022
21:18
2/1/2022
23:06
1.80 PROD1, DRILL DRLG T BOBD, 1.83 bpm/4,753 psi, WHP 264,
IA 136, OA 12
Line up and send new mud down hole
*** Note: new mud at the bit 10,095',
22:36pm
Drilling ahead 145 fph, negative CTSW -
4k. 1.8 k DHWOB
9,950.0 10,170.0
2/1/2022
23:06
2/1/2022
23:18
0.20 PROD1, DRILL WPRT T New mud all the way around, pull short
BHA wiper to obtain new parameters,
PUW 36k,
10,170.0 10,170.0
2/1/2022
23:18
2/2/2022
00:00
0.70 PROD1, DRILL DRLG T BOBD, 1.83 bpm/4,516 psi, WHP 388,
BHP 3,936, IA 21, OA 19
10,170.0 10,268.0
2/2/2022
00:00
2/2/2022
00:39
0.65 PROD1, DRILL DRLG T OBD, 1.83 bpm/4,865 psi, WHP 360,
BHP 3,963, IA 0, OA 19
140 bph, negative CTSW -4k, 1.5k
DHWOB
Dropping INC down to 88°
10,268.0 10,351.0
2/2/2022
00:39
2/2/2022
01:24
0.75 PROD1, DRILL WPRT T Wiper to the window for tie in, PUW 39lk
Observed -2k CTSW traveling past billet
10,350.0 8,500.0
2/2/2022
01:24
2/2/2022
01:36
0.20 PROD1, DRILL DLOG T Log K1 marker for depth control, plus
6.0'
8,500.0 8,527.0
2/2/2022
01:36
2/2/2022
02:36
1.00 PROD1, DRILL WPRT T Wiper back in hole, clean through
window and past billet
Set down 9,640'-9,850', PUW 39k, lower
pump rate to 0.6-1.0 bpm, pass by
clean, continue IH
8,527.0 10,350.0
2/2/2022
02:36
2/2/2022
02:54
0.30 PROD1, DRILL DRLG T BOBD, 1.81 bpm/4,684 psi, WHP 367,
BHP 3,955 psi, IA 49, OA 13
10,350.0 10,400.0
2/2/2022
02:54
2/2/2022
03:24
0.50 PROD1, DRILL DRLG P BOBD, 1.81 bpm/4,684 psi, WHP 367,
BHP 3,955 psi, IA 49, OA 13
10,400.0 10,430.0
2/2/2022
03:24
2/2/2022
06:18
2.90 PROD1, DRILL DRLG P OBD, 1.81 bpm/4,741 psi, WHP 353,
BHP 3,994, IA 57, OA 13
10,430.0 10,756.0
2/2/2022
06:18
2/2/2022
06:42
0.40 PROD1, DRILL WPRT P PU Wt 38 k lbs, PUH on 850' wiper #1
after window wiper
-600 # wob tug at 10,075'
10,756.0 9,924.0
2/2/2022
06:42
2/2/2022
07:06
0.40 PROD1, DRILL WPRT P RBIH - 560 # WOB spike at 10,072' 9,924.0 10,756.0
2/2/2022
07:06
2/2/2022
07:24
0.30 PROD1, DRILL DRLG P OA 11 psi, IA 103 psi, WH 319 psiu, CT
4969 psi @ 1.81 bpm, BHP 4053 -
12.06 ppg EMW @ the window, 12.57
ppg @ the bit. Free spin 1,091 psi
( sweep was exiting), CT wT -2 k lbs,
WOB 1.5 k lbs
10,756.0 10,880.0
2/2/2022
07:24
2/2/2022
08:12
0.80 PROD1, DRILL WPRT P PU - 37 k lbs, PUH to capture missed
surveys - Geomagnetic storm causing
interference.
10,756.0 10,880.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 12/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/2/2022
08:12
2/2/2022
08:54
0.70 PROD1, DRILL DRLG P CT RIH wt 7.6 k lbs, Free spin 1004 psi,
OBD, CT Wt -4 k lbs, WOB 1.6 k lbs,
holding 12.03 ppg at he window, 12.5
EMW at the bit.
10,880.0 10,975.0
2/2/2022
08:54
2/2/2022
09:18
0.40 PROD1, DRILL DRLG P PU Wt 37 k lbs, PUH on wiper to the
swab. - slow roll at 45 ft/ min
10,975.0 9,852.0
2/2/2022
09:18
2/2/2022
10:30
1.20 PROD1, DRILL WPRT P Dragging heavy, pulling neg WOB, turn
aropund, work pipe / modulate pump
rate, max rate on ups troke, 0.9 blpm
while RIH. Work up slowly throug
trouble spot at 15 ft/min.
Trouble spots 9.650 ' and 9,856-9,890'.
Pull to 9550' clean running, turn around
and RBIH to 9950' below trouble area.
Stacked WOB to 1.5 k lbs @ 9,650 and
9,856 - 9,890'. PUH max pump rate,
Pull heavy @ 9,633 neg WOB to from -6
k to 3.8 k lbs.
9,852.0 9,600.0
2/2/2022
10:30
2/2/2022
11:00
0.50 PROD1, DRILL WPRT P Continue out of hole dragging low side
pumping 1.9 bpm, orient for billet -
clean, orient for window - clean
9,852.0 9,600.0
2/2/2022
11:00
2/2/2022
13:12
2.20 PROD1, DRILL WPRT P POOH in tubing, 1.9 bpm, 9,600.0 83.0
2/2/2022
13:12
2/2/2022
15:00
1.80 PROD1, DRILL TRIP P Bump up, set counters, RBIH 83.0 8,495.0
2/2/2022
15:00
2/2/2022
15:24
0.40 PROD1, DRILL DLOG P Tie into the K1 for -5.5 ' correction. PU
Wt 28 k lbs Park and monitor BHP.
MD 8511.7 TVD 6033.47'
Trap 3790 psi and observe pressure
bleed steadily to 3781 psi
12.07 ppg EMW - round to 12.1 ppg
request 12.3 KW
8,495.0 8,511.7
2/2/2022
15:24
2/2/2022
16:30
1.10 PROD1, DRILL TRIP P RIH to confirm TD
Window clean, Set down on billet with
no pump, PU pass clean with min rate.
Continue in hole - Trouble spot clean.
Tag TD at 10,977
8,511.7 10,977.0
2/2/2022
16:30
2/2/2022
18:54
2.40 PROD1, DRILL TRIP P PUH slowly waiting for LRP completion. 10,977.0 10,977.0
2/2/2022
18:54
2/2/2022
19:54
1.00 COMPZ1, CASING DISP P Pull to window circulating 12.3 ppg
beaded LRP
Paint TD EOP flag Yellow (9,337.84')
10,977.0 8,645.0
2/2/2022
19:54
2/2/2022
21:54
2.00 COMPZ1, CASING TRIP P Continue POOH displacing well to 12.3
ppg completion fluiid
Paint WIndow EOP flag White
(6,878.22')
8,645.0 78.2
2/2/2022
21:54
2/2/2022
22:24
0.50 COMPZ1, CASING OWFF P PJSM for LD Drilling Assembly, check
well for flow
No-Flow,
*** Note: Static loss rate 0.6 bph, lost 38
bbls to formation while displacing to
surface.
78.2 78.2
2/2/2022
22:24
2/2/2022
23:48
1.40 COMPZ1, CASING PULD P LD and Inspect drilling assembly BHA
#15
78.2 0.0
2/2/2022
23:48
2/3/2022
00:00
0.20 COMPZ1, CASING PUTB P Prep RF for liner OPS
KuparukField in Cold Weather
Conditions for equipment and
personnel.
Send variance to Well Support for Off-
loading Super Sucker
Weather -36°, with 6 mph wind, WC -54°
0.0 0.0
2/3/2022
00:00
2/3/2022
00:42
0.70 COMPZ1, CASING PUTB P PJSM w/Rig Crew and NS Rep, finish
prepping RF
Perform inspection of traveling blocks
(good)
0.0 0.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 13/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/3/2022
00:42
2/3/2022
05:00
4.30 COMPZ1, CASING PUTB P PU Tubing 54 jts of solid liner and non-
ported bull nose
*** Note: Kick while tripping drill 3.38
min, with new floor hands. Excellent
mentoring and execution of safety drill.
Perform Quick AAR
0.0 1,668.1
2/3/2022
05:00
2/3/2022
06:18
1.30 COMPZ1, CASING PULD P PU BHA # 16, liner running assembly 1,668.1 1,717.9
2/3/2022
06:18
2/3/2022
08:00
1.70 COMPZ1, CASING RUNL P Bump up, set counters, RIH pumping
min rate down the coil. Tie into window
flag -12.7' correction. PU Wt 36 k lbs,
hanging WOB -3.5 klbs. CT RIH wt 15.6
k lbs.
1,717.9 8,511.8
2/3/2022
08:00
2/3/2022
09:18
1.30 COMPZ1, CASING RUNL P Continue to RIH, window and billet clean
Set down once at 10.383' PU - continue
in hole
8,511.8 10,971.6
2/3/2022
09:18
2/3/2022
11:42
2.40 COMPZ1, CASING TRIP P Pump online to 1.5 bpm, diff to 1025,
PU Wt - 33 k lbs - liner dropped off.
Park, reset depth, PUH, billet and
window clean.
Park and open EDC - POOH 100ft/ min
10,971.6 75.0
2/3/2022
11:42
2/3/2022
12:42
1.00 COMPZ1, CASING PULD P Park shallow PJSM while flow checking
- Good.
Unstab injector - inspect pipe.
LD BHA #16 L1 running assembly.
75.0 0.0
2/3/2022
12:42
2/3/2022
13:48
1.10 PROD2, STK PULD P PU BHA # 17, ERD drilling asembly,
fresh NOV agitator, 0.6° AKO motor, and
RB HCC Dynamus bit. Check pack offs,
replace.
0.0 78.2
2/3/2022
13:48
2/3/2022
15:24
1.60 PROD2, STK TRIP P RIH w BHA #17. 78.2 8,450.0
2/3/2022
15:24
2/3/2022
15:36
0.20 PROD2, STK DLOG P Tie into the K1 for a -3' correction, close
EDC, PU Wt 32k lbs
8,450.0 8,506.0
2/3/2022
15:36
2/3/2022
16:00
0.40 PROD2, STK TRIP P Continue in hole, stacked out in
window, picked up, passed clean, billet
clean. Dry tag TOB @ 9306'. PU Wt 32
k lbs.
8,506.0 9,306.0
2/3/2022
16:00
2/3/2022
17:12
1.20 PROD2, STK DISP P Displace well to drilling fluid. RBIH. 9,306.0 9,305.9
2/3/2022
17:12
2/3/2022
19:12
2.00 PROD2, STK KOST P KO liner top billet, 9,305.9'
1.81 bpm/4,950 psi, WHP 374, BHP
3,933, IA 0. OA 19
1.83 bpm in/1.78 bpm out, 1' ft/hr 9,307',
2' ft/hr 9,308', 3' ft/hr 9,309'
9,305.9 9,308.9
2/3/2022
19:12
2/3/2022
21:27
2.25 PROD2, DRILL DRLG P Drill ahead
1.82 bpm/4,950 psi, WHP 374, BHP
3,933, IA 0, OA 19
Holding 95° INC looking for the A2
9,308.9 9,700.0
2/3/2022
21:27
2/3/2022
21:45
0.30 PROD2, DRILL WPRT P 800' wiper up hole, PUW 32 k 9,700.0 9,000.0
2/3/2022
21:45
2/3/2022
22:03
0.30 PROD2, DRILL WPRT P Wiper back in hole, RIW 11 k
Dry drift billet (clean)
9,000.0 9,700.0
2/3/2022
22:03
2/3/2022
23:30
1.45 PROD2, DRILL DRLG P BOBD, 1.9 bpm/4,971 psi, WHP 266, IA
0, OA 20
9,700.0 10,013.0
2/3/2022
23:30
2/3/2022
23:42
0.20 PROD2, DRILL WPRT P 10,013', BHA wiper PUW 36 k, checking
differential pressures (good)
10,013.0 10,013.0
2/3/2022
23:42
2/4/2022
00:00
0.30 PROD2, DRILL DRLG P BOBD, 1.9 bpm/5,363 psi, WHP 205, IA
0, OA 20
10,013.0 10,059.0
2/4/2022
00:00
2/4/2022
00:15
0.25 PROD2, DRILL DRLG P OBD, 1.9 bpm/5,363 psi, WHP 205, IA
0, OA 20
10,059.0 10,100.0
2/4/2022
00:15
2/4/2022
00:33
0.30 PROD2, DRILL WPRT P Wiper up to 9,348', 36 k CTSW 10,100.0 9,348.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 14/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/4/2022
00:33
2/4/2022
00:51
0.30 PROD2, DRILL WPRT P Wiper back in hole, RIW 7 k CTSW
Clean wiper both ways
9,348.0 10,100.0
2/4/2022
00:51
2/4/2022
03:15
2.40 PROD2, DRILL DRLG P BOBD, 1.88 bpm/5,393 psi, WHP 283,
BHP 3,971, IA 10, OA 17
10,100.0 10,500.0
2/4/2022
03:15
2/4/2022
04:09
0.90 PROD2, DRILL WPRT P Wiper to the window 37 k CTSW, clean
pickup
Pass billet #1 & #2, window clean
10,500.0 8,500.0
2/4/2022
04:09
2/4/2022
04:21
0.20 PROD2, DRILL DLOG P Log K1 marker for depth control,
correction of + 6.0'
PUW 31 k CTSW
8,500.0 8,523.0
2/4/2022
04:21
2/4/2022
05:15
0.90 PROD2, DRILL WPRT P Wiper back in hole, RIW 12 k CTSW 8,523.0 10,500.0
2/4/2022
05:15
2/4/2022
10:00
4.75 PROD2, DRILL DRLG P OA 20 psi, IA 84 psi, WH 319 psi, CT
5,290 psi, @ 1.85 bpm in 1.84 bpm out,
BHP 3971, free spin diff 1,533 psi, CT
Wt -4 k lbs, WOB 1.5 k lbs,
10,625' PU Wt 35 k lbs, PUH to grab
missed survey.
Swap mud, new mud at the bit - 10,734'
all the way around 10,778'
Town decision to extend TD to 11,100'
10,985' PU Wt 37 k lbs Drill ahead to
10987' Town called TD
**TD
10,500.0 10,987.0
2/4/2022
10:00
2/4/2022
10:24
0.40 PROD2, DRILL WPRT P PU Wt 37 k lbs, Pump 10x10 TD
sweeps, PU slow while sweeps pumped
to bit.
RBIH to bottom as sweeps exit.
10,987.0 10,987.0
2/4/2022
10:24
2/4/2022
11:54
1.50 PROD2, DRILL WPRT P PUH on swab wiper trip chasing sweeps
to surface
Dragging low side and PUH@ 40 ft/min.
Billets and window clean
10,987.0 8,625.0
2/4/2022
11:54
2/4/2022
14:18
2.40 PROD2, DRILL WPRT P Continue to POOH in tubing to swab.
Pump pressure increased to 6500 psi.
Reduce rate from 1.8 bpm to 1.6 bpm,
CT pressure climbed up to 6500 psi
again. reduced rate.
Park, down on the pump, Open EDC.
Pressures normal
POOH pumping 2 bpm pulling 75 ft/ min
to swab.
Preload coil trak
8,625.0 62.0
2/4/2022
14:18
2/4/2022
16:00
1.70 PROD2, DRILL PULD T PUD BHA #17, erd drilling assembly 62.0 0.0
2/4/2022
16:00
2/4/2022
17:48
1.80 PROD2, DRILL PULD T PUD BHA #17, ERD drilling assembly -
new coil trak motor and bit.
0.0 62.6
2/4/2022
17:48
2/4/2022
19:21
1.55 PROD2, DRILL TRIP P RIH with BHA # 18, 62.6 8,500.0
2/4/2022
19:21
2/4/2022
19:33
0.20 PROD2, DRILL DLOG P Log K1 marker for depth control,
correction -8.0'
PUW 32 k CTSW
8,500.0 8,523.0
2/4/2022
19:33
2/4/2022
19:45
0.20 PROD2, DRILL TRIP P Continue IH 8,523.0 8,636.1
2/4/2022
19:45
2/4/2022
20:45
1.00 PROD2, DRILL CTOP P Obtain SBHP
6,126' TVD, Annular pressure 3,969 psi,
ECD 12.46 ppg
Discuss planforward with TT
Order out Formate and Returns truck for
completion fluid swap
8,636.1 8,636.1
2/4/2022
20:45
2/4/2022
22:03
1.30 PROD2, DRILL TRIP P RIH, through window and billets clean
Set down 9,400', work pipe to pass
Set down 10,645', work pipe, lower
pump rate 0.3 bpm, speed 30 fpm to
pass.
8,636.1 10,987.1
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 15/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/4/2022
22:03
2/4/2022
23:03
1.00 PROD2, DRILL TRIP T Confirm TD 10,987', recip pipe
Wait on beaded LRP 8.7 ppg drilling
mud.
10,987.1 10,987.1
2/4/2022
23:03
2/4/2022
23:21
0.30 PROD2, DRILL TRIP T RBIH, line up and start pumping beaded
LRP into coil
10,987.1 10,987.1
2/4/2022
23:21
2/5/2022
00:00
0.65 PROD2, DRILL DISP P POOH, laying in beaded Drilling Mud
8.7 ppg LRP up to 9,150'
10,987.1 9,350.0
2/5/2022
00:00
2/5/2022
00:15
0.25 PROD2, DRILL DISP P Continue POOH laying in 8.77 ppg
beaded LRP
9,350.0 9,150.0
2/5/2022
00:15
2/5/2022
06:39
6.40 PROD2, DRILL TRIP T Continue pulling into tubing, reciprocate
pipe
Wait on Fomate
9,150.0 8,405.0
2/5/2022
06:39
2/5/2022
07:00
0.35 PROD2, DRILL DISP P RIH while displacing coil to weighted
liner running pill.
Window and upper billet @ 8,950' both
clean
8,405.0 9,150.0
2/5/2022
07:00
2/5/2022
07:12
0.20 PROD2, DRILL DISP P PUH while displacing open hole and
tubing to 12.8 beaded liner running pill. -
22 bbl's total vol LRP
Billet and window both clean
9,150.0 8,552.0
2/5/2022
07:12
2/5/2022
09:00
1.80 PROD2, DRILL DISP P Continue to POOH while displacing
tubing with remaining LRP and KW
* top of LRP @ 7230'
* White flag 7262.26'
8,552.0 83.0
2/5/2022
09:00
2/5/2022
10:06
1.10 COMPZ2, CASING PULD P Park shallow, flow check while PJSM -
good
static losses 2.4 bph, Strip off and
inspect pipe.
Lay down BHA over a dead well.
83.0 0.0
2/5/2022
10:06
2/5/2022
10:36
0.50 COMPZ2, CASING BOPE P Function test BOPE - Good 0.0 0.0
2/5/2022
10:36
2/5/2022
11:12
0.60 COMPZ2, CASING RURD P Prep floor to run liner - PJSM 0.0 0.0
2/5/2022
11:12
2/5/2022
13:48
2.60 COMPZ2, CASING PUTB P PU L1-01 liner - 42 joints 2-3/8" ST-L
slotted liner under a Baker shorty
deployment sleeve with a non-ported
bullnose on bottom. Liner length
( 1292.82', lower completion LOA
1294.06')
0.0 1,294.1
2/5/2022
13:48
2/5/2022
14:06
0.30 COMPZ2, CASING RURD P Clean and clear rig floor from picking up
liner.
1,294.1 1,294.1
2/5/2022
14:06
2/5/2022
14:54
0.80 COMPZ2, CASING PULD P PU BHA # 19, liner running assembly, 1,294.1 1,338.0
2/5/2022
14:54
2/5/2022
16:36
1.70 COMPZ2, CASING RUNL P Bump up and set counters, RIH with
Lower L1-01 completion.
Tie into flag for -15' correction
PU Wt 33 k lbs, WOB -3.45
1,338.0 8,537.9
2/5/2022
16:36
2/5/2022
17:24
0.80 COMPZ2, CASING RUNL P Continue to run in open hole with L1-01
liner
Land at 10982.44' and + 2 feet past our
flag for a + 2.5' correction.
TD 10984.9'
8,537.9 10,984.9
2/5/2022
17:24
2/5/2022
17:48
0.40 COMPZ2, CASING TRIP P PUH, park, reset counters,
PUH paint a window flag
10,984.9 10,984.9
2/5/2022
17:48
2/5/2022
18:30
0.70 COMPZ2, CASING TRIP P POOH, line up pumping across the top. 10,984.9 5,764.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 16/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/5/2022
18:30
2/5/2022
19:00
0.50 COMPZ2, CASING TRIP P Kick while tripping Drill, derrick man
(new to position), needed to shut down
charge pump to move fliuid, radio to
drilller to shut down charge pump.
Derrick man noticed fluid continuing to
flow across shaker, after checking his
line up and discussing with driller what
could be going on and checking trip
sheet 4 bbls gain, Park coil 5,764',
trouble shoot. Flow died off to no flow
eventually. Checked valve on riser (vac)
confirmed well is dead,AAR discussed
pumping across the top takes a while for
the flow to deminish, and the fluid falling
out of coil while pulling out of hole could
mess with trip sheet volumes. Great
Team work and good response to things
not looking right in the pits.
5,764.0 5,764.0
2/5/2022
19:00
2/5/2022
20:12
1.20 COMPZ2, CASING TRIP P Continue POOH 5,764.0 44.2
2/5/2022
20:12
2/5/2022
20:42
0.50 COMPZ2, CASING OWFF P Stop close to surface, check well for
flow, PJSM
44.2 44.2
2/5/2022
20:42
2/5/2022
20:54
0.20 COMPZ2, CASING CTOP P Unstab INJH, inspect coiled tubing
above coil connector while tagging up.
44.2 0.0
2/5/2022
20:54
2/5/2022
21:09
0.25 COMPZ2, CASING PULD P LD & Inspect setting tools (good) 0.0 0.0
2/5/2022
21:09
2/5/2022
21:24
0.25 COMPZ2, CASING PUTB P Prep RF for LIner OPS, PSJM 0.0 0.0
2/5/2022
21:24
2/5/2022
23:30
2.10 COMPZ2, CASING PUTB P PU upper L1-01 liner section 30 joints of
slotted liner, ported bullnose, and Liner
Top Billet
0.0 954.2
2/5/2022
23:30
2/6/2022
00:00
0.50 COMPZ2, CASING PULD P PU BHI CoilTrak tools 954.2 999.3
2/6/2022
00:00
2/6/2022
00:00
COMPZ2, CASING RUNL P Stab INJH, tag up, reset counter depths 999.3 999.3
2/6/2022
00:00
2/6/2022
00:00
COMPZ2, CASING RUNL P RIH, w/upper L1-01 liner section w/30 jts
of slotted liner, ported bullnose, and LTB
999.3
2/6/2022
00:00
2/6/2022
00:15
0.25 COMPZ2, CASING PULD P Stab INJH, tag up, reset counter depths 999.3 999.3
2/6/2022
00:15
2/6/2022
01:45
1.50 COMPZ2, CASING RUNL P RIH, w/upper L1-01 liner section w/30 jts
of slotted liner, ported bullnose, and LTB
999.3 8,499.2
2/6/2022
01:45
2/6/2022
01:57
0.20 COMPZ2, CASING RUNL P Minus 15.6' Correction at Window Flag
PUW 31 k CTSW
8,499.2 8,499.2
2/6/2022
01:57
2/6/2022
02:27
0.50 COMPZ2, CASING RUNL P RIH
Pass through window clean
8,499.2 9,685.0
2/6/2022
02:27
2/6/2022
02:39
0.20 COMPZ2, CASING RUNL P 9,685', Set down 5 k DHWOB, PUW 38
k CTSW, DHOWB -9 k
Bring pump online 1.25 bpm/879 psi diff
PUW 30k CTSW, DHWOB -3 k
Remove liner Length from counters,
9,685.0 8,738.8
2/6/2022
02:39
2/6/2022
03:57
1.30 COMPZ2, CASING TRIP P POOH 8,738.8 44.2
2/6/2022
03:57
2/6/2022
04:27
0.50 COMPZ2, CASING OWFF P Close to surface, check well for flow,
PJSM
44.2 44.2
2/6/2022
04:27
2/6/2022
05:12
0.75 COMPZ2, CASING CTOP P Unstab INJH, inspect CT above coil
connector ~20' (good), LD and inspect
setting tools BHA #20
44.2 0.0
2/6/2022
05:12
2/6/2022
06:24
1.20 PROD3, STK PULD P PU/MU L1-02 Build Assembly, BHA #21 0.0 72.2
2/6/2022
06:24
2/6/2022
08:12
1.80 PROD3, STK TRIP P RIH while displacing coil to power pro 72.2 8,449.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 17/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/6/2022
08:12
2/6/2022
08:48
0.60 PROD3, STK DLOG P Tie in, drove past, had to pick up, relog,
faked out by early peak. Tie in for -7.5'
correction. Geology not 100% happy
with tie in, RIH to Log RA tag. Start
displacing KW at the same time start
logging Ra tag. 0.5' difference. PUH
into tubing.
8,449.0 8,684.0
2/6/2022
08:48
2/6/2022
09:36
0.80 PROD3, STK DISP P Displace K-formate with power pro
drilling fluid
Park, close EDC
8,684.0 8,584.0
2/6/2022
09:36
2/6/2022
10:06
0.50 PROD3, STK TRIP P RIH, window clean, saw 4.2 WOB spike
at 8686'. coil connector near X nipple.
dry tag billet8736', PU Wt 31 k lbs. PU
and set rate.
8,584.0 8,736.0
2/6/2022
10:06
2/6/2022
12:30
2.40 PROD3, STK KOST P KO billet 300° LOHS.
OA 19 psi, IA 0 psi, WH 505 psi, CT
4673 psi @ 1.83 bpm in, 1.73 bpm out,
free spin 592 psi, BHP 4152 psi. CT RIH
Wt 14.8
RIH, see motor work @ 8735.11' - CT
Wt 15.5 k lbs, grab a tenth every 6 min
x2 - engage auto @ 1'/hr
bump up to 2' /hr @ 8736.15' , issue
with setting drilled at 15'/hr then caught.
bump to 3' / hr @ 9737.19' ,
8,736.0 8,743.0
2/6/2022
12:30
2/6/2022
13:48
1.30 PROD3, DRILL DRLG P Drill ahead to
Some slip stick with big bend, Kicked
some 58° - 59° dog legs.
* TD 8,862'.
8,743.0 8,862.0
2/6/2022
13:48
2/6/2022
16:00
2.20 PROD3, DRILL TRIP P PU Wt 30 k lbs
Pull slow waiting for sweeps to clear the
bit.
RBIH, dry drift, PUH window clean.
Park, open EDC, POOH pumping 2
bpm.
8,862.0 72.0
2/6/2022
16:00
2/6/2022
17:45
1.75 PROD3, DRILL PULD P PUD BHA #21 - build turn drilling
assembly
72.0 0.0
2/6/2022
17:45
2/6/2022
20:00
2.25 PROD3, DRILL PULD P PJSM., PD L1-02 ERD Driilling
Assembly, BHA #22, with 0.6° ako and
agitator
Stab INJH
0.0 78.2
2/6/2022
20:00
2/6/2022
22:00
2.00 PROD3, DRILL TRIP P Inspect pac-off, Tag up, reset counter
depths, RIH
78.2 8,490.0
2/6/2022
22:00
2/6/2022
22:12
0.20 PROD3, DRILL DLOG P Log K1 marker for depth control,
correction of -6.0'
8,490.0 8,526.0
2/6/2022
22:12
2/6/2022
22:30
0.30 PROD3, DRILL TRIP P Continue IH through window and past
billet
8,526.0 8,862.0
2/6/2022
22:30
2/6/2022
22:48
0.30 PROD3, DRILL DRLG P OBD,
1.6 bpm/1,940 psi diff/5,600 pump
1.8 bpm/2,130 psi diff/6,050 psi pump
Agitator Failure
Confer with town team
8,862.0 8,874.0
2/6/2022
22:48
2/7/2022
00:00
1.20 PROD3, DRILL TRIP T POOH to swap out agitator (26 hrs total
time)
8,874.0 2,332.0
2/7/2022
00:00
2/7/2022
00:30
0.50 PROD3, DRILL TRIP T Continue OOH 2,332.0 78.2
2/7/2022
00:30
2/7/2022
01:30
1.00 PROD3, DRILL PULD T At surface, PJSM, PUD BHA #22 78.2 40.1
2/7/2022
01:30
2/7/2022
03:30
2.00 PROD3, DRILL PULD T
Sheave's are froze, man rider is froze
40.1 40.1
2/7/2022
03:30
2/7/2022
04:00
0.50 PROD3, DRILL PULD T Swap out agitator, MU new agitator and
motor, mark scribe line
40.1 0.0
2/7/2022
04:00
2/7/2022
05:30
1.50 PROD3, DRILL PULD T Work to free PDL's and Man Rider
Sheaves.
0.0 78.2
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 18/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/7/2022
05:30
2/7/2022
07:06
1.60 PROD3, DRILL PULD T PD BHA #23 - ERD drilling assembly,
fresh agitator, motor and Dynamus.
0.0 78.2
2/7/2022
07:06
2/7/2022
08:42
1.60 PROD3, DRILL PULD T RIH 78.3 8,450.0
2/7/2022
08:42
2/7/2022
08:54
0.20 PROD3, DRILL PULD T Tie into the K1 for -7' correction, PU Wt,
31 k lbs
8,450.0 8,523.1
2/7/2022
08:54
2/7/2022
09:06
0.20 PROD3, DRILL TRIP T Continue in hole, window and billet
clean.
Set rate and gather parameters.
OA 14 psi, IA 0 psi, WH 631 psi, CT
4861 psi at 1.83 bpm in, free spin 974
psi, BHP 4022 psi, RIH Wt 12.6 k lbs,
8,523.1 8,874.0
2/7/2022
09:06
2/7/2022
14:54
5.80 PROD3, DRILL DRLG T OBD, CT Wt 11 k lbs, WOB 2.5 k lbs,
ROP 150-250 ft/hr
9,066' PU Wt 33 k lbs - 5x5 sweep
9,276' PU Wt 33 k lbs, - 5x5 sweep
9,553' PU Wt 33 k lbs, - 5x5 sweep
ROP over interval - 117 ft/hr
8,874.0 9,553.0
2/7/2022
14:54
2/7/2022
15:09
0.25 PROD3, DRILL WPRT P PU on long wiper - 850' 9,553.0 8,870.0
2/7/2022
15:09
2/7/2022
15:27
0.30 PROD3, DRILL WPRT P RBIH 8,870.0 9,553.0
2/7/2022
15:27
2/7/2022
19:33
4.10 PROD3, DRILL DRLG P OA 17 psi, IA 0 psi, WH 403 psi, CT
4031 psi, free spin 1,065 psi, BHP 4086
psi, RIH WT 9.6 k lbs, OBD, CT Wt 2.8 k
lbs, WOB 2 k lbs.
9,826' PU Wt 33 k lbs - 5x5 sweep
10,037 - PU 37 k lbs,
10,055' - PU 33 k lbs - chasing sweep
9,553.0 10,055.0
2/7/2022
19:33
2/7/2022
20:15
0.70 PROD3, DRILL DRLG P PUH on wiper to the window
Slight tugs on CT wt and WOB @ 9,828'
and 9,608', minor motor work at 9,492
amd 9,076' - hole clean, CT weight
increased from 33 to 36 k lbs in the
build, no motor work. window clean
10,055.0 8,621.0
2/7/2022
20:15
2/7/2022
20:33
0.30 PROD3, DRILL DRLG P Park, open EDC, pump 2.5 bpm,
chasing bottoms up while pulling to
logging depth.
8,621.0 8,448.0
2/7/2022
20:33
2/7/2022
20:45
0.20 PROD3, DRILL DLOG P Tie into the K1 for a +3' correction. 8,448.0 8,519.6
2/7/2022
20:45
2/7/2022
21:03
0.30 PROD3, DRILL DRLG P Complete circ of bottoms up, Park and
close EDC.
8,605.5' MD 6,032.3' TVD
Trapped 3,964 psi and watched it bleed
to 3,903 psi in 5 minutes
** SBHP 12.47 ppg EMW and falling.
8,519.6 8,605.5
2/7/2022
21:03
2/7/2022
22:00
0.95 PROD3, DRILL TRIP P PU Wt 34 k lbs, RBIH to drill
0.65 bbls cuttings returned on the trip
8,605.5 10,055.0
2/7/2022
22:00
2/8/2022
00:00
2.00 PROD3, DRILL TRIP P OA 10 psi, IA 0 psi, WH 374 psi, CT
4917 psi @ 1.82 bpm, BHP 4161 psi,
free spin 1,027 psi, CT 3 k lbs, WOB 2 k
lbs.
10,055.0 10,332.0
2/8/2022
00:00
2/8/2022
01:30
1.50 PROD3, DRILL DRLG P OBD, 1.8 bpm/5,224 psi, WHP 371,
BHP 4,181, IA 30. OA 17
10,332.0 10,450.0
2/8/2022
01:30
2/8/2022
02:06
0.60 PROD3, DRILL WPRT P 10,450', Wiper up hole chasing 5x5
sweep, PUW 34k CTSW
10,450.0 9,600.0
2/8/2022
02:06
2/8/2022
02:36
0.50 PROD3, DRILL WPRT P 9,600', Wiper back in hole, RIW 11 k
CTSW
9,600.0 10,450.0
2/8/2022
02:36
2/8/2022
06:00
3.40 PROD3, DRILL DRLG P BOBD, 1.8 bpm/5,009 psi, WHP 455,
BHP 4,245, IA 37, OA 0
10,450.0 10,833.0
2/8/2022
06:00
2/8/2022
06:12
0.20 PROD3, DRILL WPRT P BHA Wiper up hole, PUW 10,833.0 10,833.0
2/8/2022
06:12
2/8/2022
06:30
0.30 PROD3, DRILL DRLG P BOBD, 1.82 bpm/4,822 psi, WHP 357,
BHP 4,223, IA 122, OA 0
10,833.0 10,900.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 19/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/8/2022
06:30
2/8/2022
06:48
0.30 PROD3, DRILL WPRT P 10,900', Wiper up hole PUW 33 k
CTSW
10,900.0 10,000.0
2/8/2022
06:48
2/8/2022
07:06
0.30 PROD3, DRILL WPRT P Wiper back in hole, RIW 8 k CTSW 10,000.0 10,900.0
2/8/2022
07:06
2/8/2022
08:36
1.50 PROD3, DRILL DRLG P BOBD, 1.82 bpm/4,822 psi, WHP 357,
BHP 4,223, IA 122, OA 0
10,900.0 11,050.0
2/8/2022
08:36
2/8/2022
09:36
1.00 PROD3, DRILL WPRT P Wiper to the window, PUW 35 k CTSW 11,050.0 8,450.0
2/8/2022
09:36
2/8/2022
10:12
0.60 PROD3, DRILL WPRT P Pull through window clean, circulate
bottoms up, while PUH @ 5m fpm
8,450.0 8,450.0
2/8/2022
10:12
2/8/2022
10:24
0.20 PROD3, DRILL WPRT P RBIH 8,450.0 8,490.0
2/8/2022
10:24
2/8/2022
10:42
0.30 PROD3, DRILL DLOG P Log formation for depth control plus 6.0'
PUW 32 k CTSW, Perform static check
*** Note: Obtain 10 min static above
window
12.447 ppg, 3,904 psi annular pressure,
6,037.6' TVD
8.9 ppg in MM/9.04 ppg out MM
8,490.0 8,523.0
2/8/2022
10:42
2/8/2022
11:27
0.75 PROD3, DRILL WPRT P Wiper back in hole, RIW 12 k CTSW 8,523.0 11,050.0
2/8/2022
11:27
2/8/2022
13:57
2.50 PROD3, DRILL DRLG P BOBD, 1.82 bpm/4,896 psi, WHP 288,
BHP 4,229, IA 4, OA 0
11,050.0 11,350.0
2/8/2022
13:57
2/8/2022
14:06
0.15 PROD3, DRILL WPRT P 11,350' 200' Wiper up hole, PUW 40 k
CTSW
11,350.0 11,150.0
2/8/2022
14:06
2/8/2022
14:15
0.15 PROD3, DRILL WPRT P 11,150', Wiper back in hole RIW 8 k
CTSW
11,150.0 11,350.0
2/8/2022
14:15
2/8/2022
15:00
0.75 PROD3, DRILL DRLG P BOBD, 1.82 bpm/4,981 psi, WHP 423,
BHP 4,280, IA 0, OA 0
11,350.0 11,457.0
2/8/2022
15:00
2/8/2022
15:12
0.20 PROD3, DRILL WPRT P Short Geo Wiper, PUW 32 k CTSW,
RBIH
11,457.0 11,457.0
2/8/2022
15:12
2/8/2022
16:12
1.00 PROD3, DRILL DRLG P BOBD, 1.82 bpm/4,981 psi, WHP 423,
BHP 4,280, IA 0, OA 0
11,457.0 11,565.0
2/8/2022
16:12
2/8/2022
16:30
0.30 PROD3, DRILL WPRT P 11,565', Wiper up hole PUW 34 k CTSW 11,565.0 10,750.0
2/8/2022
16:30
2/8/2022
16:54
0.40 PROD3, DRILL WPRT P 10,750', Wiper back in hole, chasing
sweeps, RIW 7.5 k CTSW
10,750.0 11,565.0
2/8/2022
16:54
2/8/2022
18:54
2.00 PROD3, DRILL DRLG P BOBD, 1.82 bpm/4,981 psi, WHP 423,
BHP 4,280, IA 0, OA 0
11,565.0 11,715.0
2/8/2022
18:54
2/8/2022
19:12
0.30 PROD3, DRILL DRLG P Reach plan TD @ 11715', pump 10 X 10
sweeps
11,715.0 11,715.0
2/8/2022
19:12
2/8/2022
22:12
3.00 PROD3, DRILL WPRT P Start wiper trip to swab, Jog below build
@ 8850. Pump 10 X 10 window sweeps.
Clean past billet @ 8736. Clean through
window. Continue out, Jog @ 100'
11,715.0 78.3
2/8/2022
22:12
2/9/2022
00:00
1.80 PROD3, DRILL WPRT P RIH, Midnight depth 8490 78.3 8,490.0
2/9/2022
00:00
2/9/2022
00:06
0.10 PROD3, DRILL WPRT P Continue in well 8,490.0 8,528.0
2/9/2022
00:06
2/9/2022
00:12
0.10 PROD3, DRILL DLOG P Log K1 for -7' correction 8,528.0 8,420.8
2/9/2022
00:12
2/9/2022
00:54
0.70 PROD3, DRILL PRTS P Obtain SBHP. Sensor TVD 6048.
Pressure stabilized @ 3903 PSI, EMW=
12.42PPG
8,420.8 8,630.0
2/9/2022
00:54
2/9/2022
02:48
1.90 PROD3, DRILL WPRT P Continue in hole to confirm TD. Clean
through window. clean past billet. 1K
bump @ 9325'. Very minor. Tag up @
11718' confirmed TD. PUH 2 BBls until
beaded 8.6 PPG Liner running pill exits
nozzel. PUW=35K
8,630.0 11,718.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 20/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/9/2022
02:48
2/9/2022
03:48
1.00 PROD3, DRILL TRIP P POOH laying in 8.6 PPG liner running
pill to 9000', PUW=34K, Pump 12.8
PPG liner pill followed with 12.8 PPG to
surface. Pump EOP flags 9550 and
6400'
11,718.0 8,600.0
2/9/2022
03:48
2/9/2022
05:30
1.70 PROD3, DRILL TRIP P Continue POOH displacing well to
completion fluid
8,600.0 78.2
2/9/2022
05:30
2/9/2022
06:00
0.50 PROD3, DRILL OWFF P Check well for flow, PJSM 78.2 78.2
2/9/2022
06:00
2/9/2022
07:30
1.50 PROD3, DRILL PULD P LD and inspect drilling assembly over a
dead well
Bit grade: 1-3-BT-A-X-I-CT-TD
78.2 0.0
2/9/2022
07:30
2/9/2022
08:30
1.00 COMPZ3, CASING PUTB P Prep RF for liner OPS 0.0 0.0
2/9/2022
08:30
2/9/2022
11:30
3.00 COMPZ3, CASING PUTB P PU L1-02 Liner assembly w/68 jts of
slotted liner, non-ported Bullnose
0.0 2,118.5
2/9/2022
11:30
2/9/2022
12:12
0.70 COMPZ3, CASING PULD P PJSM, PU Liner running assembly BHA
#24
2,118.5 2,162.7
2/9/2022
12:12
2/9/2022
14:12
2.00 COMPZ3, CASING RUNL P RIH, w/L1-02 Sloitted liner, 68 jts, non-
ported bullnose, and LTB, BHA #24
2,162.7 8,562.0
2/9/2022
14:12
2/9/2022
15:42
1.50 COMPZ3, CASING RUNL P Correct depth at 6,400' EOP minus
14.0', continue IH
Work liner down 10,780'-10,946'.
8,562.0 11,718.0
2/9/2022
15:42
2/9/2022
15:54
0.20 COMPZ3, CASING RUNL P Land liner, bring pump online 1.5
bpm/1,122 psi, PUW 41 k brake over to
32 k CTSW, DHWOB 6 k - 0 k. remove
liner length from counters
11,718.0 9,599.5
2/9/2022
15:54
2/9/2022
17:48
1.90 COMPZ3, CASING TRIP P POOH 9,599.5 55.0
2/9/2022
17:48
2/9/2022
18:18
0.50 COMPZ3, CASING OWFF P Tag up. Perform no flow test - Good. 55.0 55.0
2/9/2022
18:18
2/9/2022
19:00
0.70 COMPZ3, CASING BHAH P Lay down BHA # 24 on dead well 55.0 0.0
2/9/2022
19:00
2/9/2022
20:00
1.00 PROD4, STK BHAH P Make up lateral drilling BHA # 26 to drill
L1-03. Make up to coil and surface test -
Good. Tag up and set counters
0.0 78.3
2/9/2022
20:00
2/9/2022
22:06
2.10 PROD4, STK TRIP P Trip in well, BHA #25 78.3 8,490.0
2/9/2022
22:06
2/9/2022
22:12
0.10 PROD4, STK DLOG P Tie into K1 for -1' 8,490.0 8,517.0
2/9/2022
22:12
2/9/2022
22:18
0.10 PROD4, STK TRIP P Continue in well 8,517.0 8,625.0
2/9/2022
22:18
2/9/2022
23:00
0.70 PROD4, STK DISP P Displace well to 8.6 PPG Pwr Pro 8,625.0 8,625.0
2/9/2022
23:00
2/9/2022
23:36
0.60 PROD4, STK TRIP P Close EDC trip in well, Stacked out in
bottom of window, PUH roll pump. Shut
down pump. Clean pass through
window past billet
8,625.0 9,597.0
2/9/2022
23:36
2/9/2022
23:42
0.10 PROD4, STK MILL P Dry tag liner top billet @ 9597, PUH,
PUW=32K. Bring pump online 1.8 BPM
@ 5180 PSI FS
9,597.0 9,596.7
2/9/2022
23:42
2/10/2022
00:00
0.30 PROD4, STK MILL P Set down on billet, Start milling 1 FPH
@ 9596.7, 30° LOHS
Midnight depth 9596.9
9,596.7 9,596.9
2/10/2022
00:00
2/10/2022
00:42
0.70 PROD4, STK MILL P Continue milling off billet @ 1 FPH, 30°
LOHS
9,596.9 9,597.7
2/10/2022
00:42
2/10/2022
01:12
0.50 PROD4, STK MILL P Go to 2 FPH, 1.8 BPM @ 5180 PSI FS,
BHP=4087 PSSI, 30° LOHS
9,597.7 9,598.7
2/10/2022
01:12
2/10/2022
01:36
0.40 PROD4, DRILL MILL P Go to 3 FPH, 1.8 BPM @ 5180 PSI FS,
BHP=4081. 30° LOHS
9,598.7 9,600.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 21/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/10/2022
01:36
2/10/2022
06:36
5.00 PROD4, DRILL DRLG P Drill ahead, 1.8 BPM @ 5180 PSI FS,
BHP=4080
9,600.0 10,031.0
2/10/2022
06:36
2/10/2022
07:00
0.40 PROD4, DRILL WPRT P 10,031'. Wiper up hole to 9,200', PUW
36 k CTSW
10,031.0 9,200.0
2/10/2022
07:00
2/10/2022
07:18
0.30 PROD4, DRILL WPRT P Wiper back in hole RIW 9 k CTSW, dry
drift past billet clean
9,200.0 10,031.0
2/10/2022
07:18
2/10/2022
10:18
3.00 PROD4, DRILL DRLG P BOBD, 1.83 bpm/4,945 psi, WHP 280,
BHP 4,162, IA 0, OA 14
*** Note: Increase EDC's at the window
12.65 ppg
10,031.0 10,400.0
2/10/2022
10:18
2/10/2022
11:18
1.00 PROD4, DRILL WPRT P Wiper up hole to the window, PUW 35 k
CTSW
10,400.0 8,500.0
2/10/2022
11:18
2/10/2022
11:30
0.20 PROD4, DRILL DLOG P Circulate bottoms up with EDC closed,
Log K1 marker for depth control plus
5.0', RIH
8,500.0 8,630.4
2/10/2022
11:30
2/10/2022
11:48
0.30 PROD4, DRILL CTOP P Obtain 10 min static above window
8,630',
*** Note: 12.378 ppg/3,929 psi
AP/6,111.84' TVD/WHP 1000/8.8 out-9.0
-in
8,630.4 8,630.0
2/10/2022
11:48
2/10/2022
12:24
0.60 PROD4, DRILL WPRT P RBIH, through window, notice 4k drop in
CTSW, continue to bottom
8,630.0 10,400.0
2/10/2022
12:24
2/10/2022
15:24
3.00 PROD4, DRILL DRLG P BOBD, 1.82 bpm/4,968 psi, WHP 418,
BHP 4,232, IA 0, OA 14
10,400.0 10,624.0
2/10/2022
15:24
2/10/2022
17:48
2.40 PROD4, DRILL DRLG P BOBD, 1.81 bpm/5,195 psi, WHP 446,
BHP 4,251, IA 17, OA 14
10,624.0 10,800.0
2/10/2022
17:48
2/10/2022
18:30
0.70 PROD4, DRILL WPRT P Wiper trip #1 800' up. PUW=35K Clean
trip up and down
10,800.0 10,800.0
2/10/2022
18:30
2/10/2022
19:24
0.90 PROD4, DRILL DRLG P Drill ahead, 1.84 BPM @ 4810 PSI FS,
BHP=4147
10,800.0 10,868.0
2/10/2022
19:24
2/10/2022
19:30
0.10 PROD4, DRILL WPRT P BHA wiper, stacking, PUW=41K 10,868.0 10,868.0
2/10/2022
19:30
2/10/2022
21:00
1.50 PROD4, DRILL DRLG P Drill, 1.86 BPM @ 5155 PSI FS,
BHP=4238
10,868.0 10,990.0
2/10/2022
21:00
2/10/2022
21:06
0.10 PROD4, DRILL WPRT P Pick up, loosing diff pressure,
PUW=41K
10,990.0 10,990.0
2/10/2022
21:06
2/11/2022
00:00
2.90 PROD4, DRILL DRLG P Drill, 1.82 BPM @ 5155 PSI FS,
BHP=4251
10,990.0 11,147.0
2/11/2022
00:00
2/11/2022
00:42
0.70 PROD4, DRILL DRLG P Drill, 1.81 BPM @ 5155 PSI FS,
BHP=4200
11,147.0 11,200.0
2/11/2022
00:42
2/11/2022
01:24
0.70 PROD4, DRILL WPRT P Wiper trip #2 800', PUW=34K 11,200.0 11,200.0
2/11/2022
01:24
2/11/2022
02:06
0.70 PROD4, DRILL DRLG P Drill, 1.82 BPM @ 5044 PSI FS,
BHP=4381
11,200.0 11,250.0
2/11/2022
02:06
2/11/2022
02:12
0.10 PROD4, DRILL WPRT P BHA wiper, Stacked out, PUW=41K 11,250.0 11,250.0
2/11/2022
02:12
2/11/2022
03:42
1.50 PROD4, DRILL DRLG P Drill, 1.83 BPM @ 5070 PSI FS,
BHP=4272
11,250.0 11,323.3
2/11/2022
03:42
2/11/2022
03:54
0.20 PROD4, DRILL WPRT P BHA wiper up hole, PUW 46 k CTSW 11,323.3 11,323.0
2/11/2022
03:54
2/11/2022
06:54
3.00 PROD4, DRILL DRLG P BOBD, 1.82 bpm/5,061 psi, WHP 236,
BHP 4,280, IA 64, OA 14
11,323.0 11,642.0
2/11/2022
06:54
2/11/2022
07:06
0.20 PROD4, DRILL WPRT P BHA wiper up hole, PUW 40 k CTSW 11,642.0 11,642.0
2/11/2022
07:06
2/11/2022
08:36
1.50 PROD4, DRILL DRLG P BOBD, 1.82 bpm/5,061 psi, WHP 236,
BHP 4,280, IA 64, OA 14
11,642.0 11,710.0
2/11/2022
08:36
2/11/2022
08:48
0.20 PROD4, DRILL WPRT P 11,710', TD Lateral, recip pipe for sweep
to get to bit.
11,710.0 11,710.0
2/11/2022
08:48
2/11/2022
10:24
1.60 PROD4, DRILL WPRT P Wiper to window, PUW 40 k CTSW 11,710.0 8,650.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 22/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/11/2022
10:24
2/11/2022
12:54
2.50 PROD4, DRILL WPRT P Continue POOH to surface, pumping 1.9
bpm/4.764 psi, WHP 776, BHP 3,329, IA
44, OA 14
Perform jog back in hole 100' @ 1,500';
8,650.0 78.2
2/11/2022
12:54
2/11/2022
14:36
1.70 PROD4, DRILL TRIP P At surface, reset counter depths, RBIH 78.2 8,490.0
2/11/2022
14:36
2/11/2022
14:48
0.20 PROD4, DRILL DLOG P Log the K1 marker for depth control,
correction of - 7.0'
Continue RIH to logging depth
8,490.0 8,523.0
2/11/2022
14:48
2/11/2022
15:12
0.40 PROD4, DRILL CTOP P 8,630', obtain Static Pressure survey
above window
8,523.0 8,630.0
2/11/2022
15:12
2/11/2022
17:00
1.80 PROD4, DRILL TRIP P RIH, clean through window
Bobble seen @ 9,960'
8,630.0 11,717.0
2/11/2022
17:00
2/11/2022
18:24
1.40 PROD4, DRILL CIRC P Recip pipe waiting on LRP 11,717.0 11,717.0
2/11/2022
18:24
2/11/2022
21:18
2.90 PROD4, DRILL TRIP P POOH pumping 12.5 PPG liner running
pill followed with 12.5 completion fluid,
Paint EOP flags @ 10,785 and 7600'.
11,717.0 75.0
2/11/2022
21:18
2/11/2022
21:48
0.50 PROD4, DRILL OWFF P At surface, Perform 30 min no flow test.
PJSM to lay down drilling BHA
75.0 75.0
2/11/2022
21:48
2/11/2022
22:30
0.70 PROD4, DRILL BHAH P Unstab injuector. Inspect coil coming to
stripper. Lay down BHA #25. Bit out @ 1
-2
75.0 0.0
2/11/2022
22:30
2/11/2022
23:30
1.00 COMPZ4, CASING RURD P Rig up floor to run liner. Inspect safety
joint. PJSM liner running ops
0.0 0.0
2/11/2022
23:30
2/12/2022
00:00
0.50 COMPZ4, CASING PUTB P P/U L1-03 Lower liner segment with non
ported bull nose, 29 Jts slotted 2 3/8"
liner and QCLL receptical. 5 joints in at
midnight
0.0 150.0
2/12/2022
00:00
2/12/2022
01:18
1.30 COMPZ4, CASING PUTB P Continue P/U L1-03 lower liner segment 150.0 885.0
2/12/2022
01:18
2/12/2022
02:00
0.70 COMPZ4, CASING BHAH P Tubing in well. Rig down floor from liner
ops. Make up NS QCLL receptical to
tubing, P/U coiltrak. Make up to copil
and surface test
885.0 929.4
2/12/2022
02:00
2/12/2022
03:42
1.70 COMPZ4, CASING TRIP P RIH BHA #26 929.5 8,544.0
2/12/2022
03:42
2/12/2022
03:48
0.10 COMPZ4, CASING DLOG P Tie into flag for -16', PUW=32K 8,544.0 8,529.7
2/12/2022
03:48
2/12/2022
04:00
0.20 COMPZ4, CASING TRIP P Continue in well 8,529.7 9,350.0
2/12/2022
04:00
2/12/2022
04:06
0.10 COMPZ4, CASING DLOG P Log K1 for +8'. Make correction 9,350.0 9,385.0
2/12/2022
04:06
2/12/2022
05:30
1.40 COMPZ4, CASING TRIP P Continue in well, Set down @ 10,487.
Work through, continue in.to setdown @
10,660'. Work through
9,385.0 11,717.0
2/12/2022
05:30
2/12/2022
05:36
0.10 COMPZ4, CASING TRIP P Tag bottom, PUW=41K, DHWOB=-2.4.
Set back down. Pumps on 1.5 BPM,
PUW=31K, DHWOB=-.9 TOL=10,831
11,717.0 11,717.0
2/12/2022
05:36
2/12/2022
08:06
2.50 COMPZ4, CASING TRIP P POOH,
Paint EOP flag @ 9,530' White
Paint EOP flag @ 7,200' Yellow
11,717.0 44.3
2/12/2022
08:06
2/12/2022
08:36
0.50 COMPZ4, CASING OWFF P At surface, check well for flow, PJSM 44.3 44.3
2/12/2022
08:36
2/12/2022
09:06
0.50 COMPZ4, CASING PULD P LD setting tools over a dead well\
** Valve Crew on location to service well
head in prep for BOP testing
44.3 0.0
2/12/2022
09:06
2/12/2022
10:36
1.50 COMPZ4, CASING CTOP P Prep for BOP testing, grease choke
manifold, tango valves, romeo valves,
etc.
0.0 0.0
2/12/2022
10:36
2/12/2022
11:30
0.90 COMPZ4, CASING CTOP P Obtain shell test 5,000 psi 0.0 0.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 23/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/12/2022
11:30
2/12/2022
20:00
8.50 COMPZ4, CASING BOPE P Start BOPE testing, Low test pressure
250 psi/High test pressure 5,000
psi/Annular 2,500 psi.
Wintess waived by AOGCC Guy Cook
Test 1. Swab 2-Fail/Pass
Test 2. Blind/Shear, BOP TV2, Charlie
4, 5, 8, &12 - Pass
Test 3. BOP TV 1, Charlie 3, 7, & 11 -
Pass
Test 4. Manual choke D & Super choke
C - Pass
Test 5. Romeo 3, Bleeder 3, Tango 2,
Charlie 2, & 10 - Pass
Test 6. Charlie 1, 9, Bravo 5, and Tango
1 – install TIW test joint -Pass
Test 7. Lower 2” pipe slip rams, TIW #1,
Romeo 1, Bleeder 1 - Pass
Test 8. Annular BOP 250/2500-Pass
Test 9. Upper 2” pipe slip rams, Bravo
6, & 8-Pass
Test 10. Bravo 7 – swap out 2” test joint
for 2-3/8”-Pass
Test 11. 2-3/8” pipe slip rams, TIW#2 –
check N2 levels, swap to 2” test joint-
Pass
Test 12. Draw down accumulator-Pass
Test 13. Stab injector and line up to
reverse circulate coil, test inner reel
valve and stripper.
Tested all gas detectors, pits, cellar,
Verified flow alarms - PVT
Only fail pass was swab two. Recall
grease crew and service valve
0.0 0.0
2/12/2022
20:00
2/12/2022
21:18
1.30 COMPZ4, CASING RURD P Rig down from BOPE test, Install floats
in UQC. Prep floor for liner ops, Fill hole.
0.0 0.0
2/12/2022
21:18
2/13/2022
00:00
2.70 COMPZ4, CASING PUTB P PJSM, P/U L1-03 intermediate liner
section, Disolvable bullnose, 41 Jts
slotted liner, and NS QCLL
0.0 0.0
2/13/2022
00:00
2/13/2022
00:12
0.20 COMPZ4, CASING PUTB P Continue picking up L1-03 intermediate
liner segment, Make up coiltrak to liner.
Make up to coil and surface test
0.0 1,298.9
2/13/2022
00:12
2/13/2022
01:48
1.60 COMPZ4, CASING TRIP P RIH BHA # 27 1,298.9 8,510.0
2/13/2022
01:48
2/13/2022
01:54
0.10 COMPZ4, CASING DLOG P Correct to flag for -11', PUW=31K 8,510.0 8,499.0
2/13/2022
01:54
2/13/2022
02:18
0.40 COMPZ4, CASING TRIP P Continue in well, RIW=16K 8,499.0 9,720.0
2/13/2022
02:18
2/13/2022
02:24
0.10 COMPZ4, CASING DLOG P Log K1 for +3'. Continue in hole 9,720.0 9,731.0
2/13/2022
02:24
2/13/2022
02:42
0.30 COMPZ4, CASING TRIP P Continue in hole 9,731.0 10,750.0
2/13/2022
02:42
2/13/2022
02:48
0.10 COMPZ4, CASING TRIP P 10,750' Wt Chk, PUW=38.
DHWOB=4.2K. Continue in to setdown
@ 10,831. PUH to 40 K. DHWOB=-8K.
Latched up. Bring pumjps online @ 1.5
BPM. PUW=30K, DHWOB=.7K,
TOL=9577
10,750.0 10,831.0
2/13/2022
02:48
2/13/2022
04:18
1.50 COMPZ4, CASING TRIP P Remove liner length from counters,
1254.94', Trip out of hole, Paint flags @
8633 and 7643.98 for 7500 and 8590'
EOP
10,831.0 91.0
2/13/2022
04:18
2/13/2022
04:48
0.50 COMPZ4, CASING OWFF P At surface, perform 30 min no flow,
PJSM lay down BHA on dead well
91.0 91.0
2/13/2022
04:48
2/13/2022
05:36
0.80 COMPZ4, CASING BHAH P Lay down BHA #27 liner running tools 91.0 0.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
Page 24/24
3M-05
Report Printed: 2/24/2022
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/13/2022
05:36
2/13/2022
06:36
1.00 COMPZ4, CASING PUTB P Prep RF for liner ops 0.0 0.0
2/13/2022
06:36
2/13/2022
08:36
2.00 COMPZ4, CASING PUTB P PU L1-03 Upper liner segment 0.0 939.3
2/13/2022
08:36
2/13/2022
09:36
1.00 COMPZ4, CASING BHAH P PU, BHI CoilTrak tools and NS setting
tool
939.3 983.3
2/13/2022
09:36
2/13/2022
12:06
2.50 COMPZ4, CASING RUNL P Stab INJH, tag up, reset counters, RIH
Correct to the flag - 8.0', PUW 33 k
CTSW
983.3 9,410.0
2/13/2022
12:06
2/13/2022
12:18
0.20 COMPZ4, CASING DLOG P Log K1 marker for depth control
correction of + 2.0'
9,410.0 9,439.0
2/13/2022
12:18
2/13/2022
12:30
0.20 COMPZ4, CASING RUNL P Continue IH 9,439.0 9,577.0
2/13/2022
12:30
2/13/2022
12:48
0.30 COMPZ4, CASING RUNL P 9,577', Set down 8 k CTSW, PUH 41 k
CTSW to confirm lactched, set back
down 8k, bring pump online 1.5 bpm/Diff
1,126 psi,
PUH 29 k CTSW, 8,623'
9,577.0 8,637.3
2/13/2022
12:48
2/13/2022
13:18
0.50 DEMOB, WHDBOP WAIT P Vac trucks on location, spot after truck
repair
8,637.3 8,623.0
2/13/2022
13:18
2/13/2022
14:18
1.00 DEMOB, WHDBOP DISP P Diplace well to SW 8,623.0 8,623.0
2/13/2022
14:18
2/13/2022
16:18
2.00 DEMOB, WHDBOP TRIP P POOH,
LRS on location, PJSM, spot in, RU, PT
4,500 psi
8,623.0 2,600.0
2/13/2022
16:18
2/13/2022
18:12
1.90 DEMOB, WHDBOP FRZP P Freeze Protect well from 2,600', Tag up
and space out
2,600.0 50.0
2/13/2022
18:12
2/13/2022
20:00
1.80 DEMOB, WHDBOP BHAH P On surface, Tag up. Space out PJSM.
PUD BHA # 28
50.0 0.0
2/13/2022
20:00
2/13/2022
21:00
1.00 DEMOB, WHDBOP CTOP P Make up Swizzle stick, Stab on well. Jet
stack / Flush rig
0.0 0.0
2/13/2022
21:00
2/14/2022
00:00
3.00 DEMOB, WHDBOP RURD Unstab, Blow down rig TT line.
Disconnect from tiger tank and release
to tool house. Replace UQC rehead E-
line, Start RDMO Check list
0.0 0.0
Rig: NABORS CDR3-AC
RIG RELEASE DATE 2/14/2022
!"#$%&'#!$(%#!'&)#*+*,-'!'&(##-)# .'&
**#!%(
/
01&'!$!)--#'')2#!'!3!(''%24
)4,/
51
#-!%(!$-2#!'!66#'')!'!%!!$(,-($(%.'78
'!3+#'!*,!$4/95:5&;<9596(!%878$(%)(=%#-4 8
>
'!!(!-&%#-4 8>3(%3 --$'' 2-475?$,3(''!($ $(%
3(%3 --&+$(%!(=5.**!(&
%4!$3'/959676&2*$ ! #%!$(%#*,%)#$(%=!%(.
**!(&3,%%3(!;$(%'!$!% --(/95967
;+- --(3(%32!2*$ '!)*,&3+-!!('!$!%$$(2*$ '!)*,
! '&#)--%)!+-$(%)(% --!2-!(+-&%)#'-*,-(
$(%$( 2-*,'&$(%*$-#
=
@=" A 7B0..C76.. .D8/959.
@EA7ED8;8
;75.. F/959. 780.
D959. B". @D;C&D88
959. CF= A779
"..F=;
D;8 /95BB. CD;87
D7
'!'$*+$%!"%--((!3,
0
B6B
"
D('+%*$-#-%! (%!+$!332-32$*,)#3(%3G=-*,'!#(!&
#*,%)#G=-*,('-*,-('!(%#!+&$('!*+*,!(')'!(G=-*,&
%%3('-*,-()(!& 8>"3+#'!*,!$4&!/95BB&;<9556
#)! 8>03(%3 --78!(=B.**!(&%4!$3'/955B.
'!$!% --(3(%3/955679.9559760
0
(!() --(3(%3D9559760.!95B7B7)*+'-3#''!+(G#*!%7
)-- 8('#*!(&*+$(% --$(% !='!$!% --(3(%3
6
(!() --(3(%3 95B7B.!95B07(!()!' )*+'-3
#''!+(G#*!%783 8>6('#*!($(%*()$!(7
8$! %(+!7
5
8>53!+)'% --$(%'!($ &8!(=5.**!(&'!$!%
--(/95B"763!+(#''&8$(% 8>5&$4%3($!$!$(%
#*,)#3(%3 --(#)#$(%+42% --& 8>B8%(!
=576.
**!('!$!% --(/95B0767#''7($(#$(!-$(##$$!(
*$ $-78$(%'!$!! 8>B7
B
#-! 8>B7+!-&*$ $=3$!(-*!*$-*''
+!'+!7 8>9*$ $&8!)((!+3--!'+3$!&#) #%
"22-'($!!8!*-7E%((3%($-! 7!)(3--!%--(
-)%78$(%*$ $ 87 8>: $,F3+#'!*,'!!(
$'' 2-478! %(+!%#!+B&5.7
9
(!()(+-!'!%#!+7!;$!9505.!$4(!%878&
8>:7 8>
&3(%3 --($'' 2-4>
78$(%%4!$;9&505.7
--G!3(%3!9&56.2' --"76H/9&50:7".7 %8$ (
#$'''&%4%!=*-$(&87 8>
7!'!$*,3+-!)((*-!
'+3$!7'!((-($(%'!##!6,#'=%7+--!'!!66
#'=%7!$! !'!=3!(''3$%24)'!(*$%=7
:
(!()!!'! 7 %)##I)*,$(%*)!
.*--$!'#!$(%
#!!%##&=+$%%*-#)--!'!!"6&('!$-- $,)##I)*,$(%#'')
!'!!"6#'&#*,%)# 8>
$(%#'')%#-4%
76?$, !3!+$!
$%)'2!&!%(=B76.**!($(%%4!$%!+ ;/9567--G!
3(%3(BH$(%$!+-!9&5B.7
"=6
) $4#$!('
!;$!9505.!
"
%$ (#$'''/8&"&"&$(%74%!3(%3=-$(7$
2!! 78*+$'('3#'7 8>
&(%'!$3(%3 --(
$'' 2-47!'!$*,$(% 8>
&2)-%%--($'' 2-478!3(%3!(
="76.**!(&3(%3*-$(%--2)-%!996#+
$'' 2-47
%--($'' 2-4&$!$!&75? !8
"2!78$(%%--
! %(+!%#!+9&9:.7
"
(!()!%--$+$% 9&9:.!:&"
6.78(3#&-2)-%'*!(&
4($--4-%%-'!2**!7 8$(%%--$+$%!
.&
%*'( $%!#-)2$*,%--%$+$%%$!$!
0&88 &
#''))(%#-4%2+$
"-$!$-$'' 2-4&*,%)#$(%%#-4%2+$
0
8
8&!C*,%8 --!/9&96.&%--%$+$%!
&59.7 )%'3$#/
&:6.&# (3#'$(%#) #('3#'$'(%%7
(!()!%--$+$%
&59.!
&"6.7)---(3#!3(%3!(7
;(%3$(%+-*-$((!#)!7!)-!8 :50=:96.*)!#) #$!
$(%)((('#%'!#$''7(!()(+-$(%%--$+$%!3#
&B65.&%--%
$+$%!#-$((%
&:B6.&# '3$23#$(%*-$(+-&2!$( 8
7
##$(%$--(&*( %
&:BB.&-$%(2$%%
7"##&%'#-$*%3--!
* #-!(-)%3+-8&$(%('#*!%%--($'' 2-4&2!$%
=
7#
D-(7
"
D('+###(D-(&)2(&8$(%-$'%
'-!!%-(
* #-!((%#!+&8&,*,%--($'' 2-4 8>
B&8&*,%
(# --!/:&"5.&%--%$+$%!
&6:.&# (3#'$(%#) #(
'3#'$'(%%7
0
(!()--($+$%
&6:.!
&:9B.&# (3#'$(%#) #(
'3#'$'(%%
)--%'3$23#&$!')$*'3$##%)!%--($'' 2-4%)!$2( $-%
#'')'& 8&-%
%#!+*(!-&2!$(% 8"&:5:#'
76##&
*(%3!+!3(!$ &'3$##%)!* #-!(-)%! $!
79##&
*(!()%8&*( %
&:9B.&-$%(2$%%)#!:&
6.&
6
(!()-$4((&3$!( $!&-$4(
79##2$%%)#!B&".&
%--($'' 2-4& )(*!(!'!7)(-3-(' (!30J!'
'-!!%-(&((=#!%2)--('&$(%'+!4%#-4 (!'-&-$'(2!! &
8&'!!(!-'$%$%3--&
=
)##-(' (!3"J!'
'-!!%-(&#!%2)--('&$(%(# --!& 8-$,!-'
5
!$28&83
=
)##-(' (!&**!%!!+3(%3-$=
67.&-$'-((2!! &8&!!(!-'7 8>
& )-%%--(
$'' 2-478&!)(3--!374!$ /9&B"5.7%!$*,
2--!$(%%--2)-%!)(!9&95.78 8>
&%--($'' 2-4&
$!$!&75? !$(%4($ )'2!78$(%%--!9&9B6.&#) #$(%%!
++&8$!$!$-)@970:+'A&"". %(+!%#!+
B
(!()8& 8>&'3$#)!$!$!&--($'' 2-4 8>"&
8&- $!(%#!+*(!-&--+$% 9&9B6.!:&66".78(-(
3#!9&9B.&J)'!2-32)-%7 8$(%%--!
&66.&)---(3#!3(%3
!(%#!+*(!-7$##'')$(% (!6 (72'% 8
705##;$(%$--(7 8$(%%--! %(+!%#!+
&"".7
9
((!)%--($+$%$(%3#%
&"".!
&B
6..&3#'
&06.&
&:.&
&6.&
&656.3*-$(7
(! 8$23(%3
706##"&:0#'&87--!#-$(/
&B
6.7
) #'3#' '3$23#7 8%(+!%#!+90:((('3$2
3#
:
#-!'3$23#!*( %/
&B
9.*-$(!#7$4(()(((#--
--3%3!+
79 #-!(-)-%!')$*7$(%)(
=-(!
B
9.7
#%--( 8>67#(7(=
'#-$*3--2$*,!9753
&4!$ --!/:6:B&!$! --(/:6:57B
Above the red line is the 3M-05L1 lateral. -WCB
*( %
&:BB.&
8$(%-$'%
'-!!%-(###
* #-!((%#!+&
--2--!/:6:B7B.&--$+$%-
="-$!$-!
&
0B.
)--
="-$!$-
&
0B!#-$(/
&B
B7 '3$23#7 8*(
7#)!%'#-$*(!
752$%%-()(((#--* #-!(-)%7
)#$(%)(
="'-!!%-(-3' (!
)-- !'!&'!3!('3$%24)4,&&
="
(! %$!-(' (!
"
#-!(! %$!$(%)##-(' (!'7--3--!'$3$!7#)!7
DK#!*!!)2( 6.
B =
D 79HD/95"B. 7 8
DD/95"B. @":"0#'A 8D8
E77BH=@<
756.A3
7B9
HF7=6&7 7
9 =
7B9HFD
/95"B. 7
!"
!#$%&
50-029-21706-60
'(
) ( %#"
(
*+
(
(
,-.
/(
/0(
!""(#
#
$%&
' (
.( !"0
()*" +
( $%&
' (
(
,++
*
)(
1)(
'
2(
))(+"-.')/0
+
(
"-.'11(
2 3++
2
+
45
!+
6,++ 0
660
0+0
/
/
%."(
%"(
3
.(
.(
435#/
45#
1"%(
&
&
%2"%2-5&7
%2"% &.
&/"3(
&
.8.9&%7
"5-8 %9 7&7..,
/0
678
9".
6*8
) .
678
!"
").
:;;" "<"< " &- 7&.. .2 &"-.5%"
(+
(
"
(
. !"
"& *!
+( 9)6*+8
6
8
45#
6
8
678
435#/
6
8
*: (72-5"&"
" &&&%&
9)
6
8
.)
*)6/08
*
6
8
<<
;* 03+
#= 6 ;*#
+
3"& 72%& ' ("<" <"">
,1,; 1,;, 72%5%& 72-5"&" !":"' !":"("<"<5>7>
,1,; 1,;, 72- & "2-..& !"' !"(<<">"">
6
8
;
678
<
678
435#/
6
8
45#
6
8
*+
6
8
*+
6
8
.
6
8
3
.
6
8
+
6
8
%
675&=8 *)
72-5"&" 7-& " 7& - %2&" . %&5 27&%2".&" %2" 2 5&7 ""2-7.&5 "5&7 52% "&7% ,1,;'(
*;
)!#$%&,&
72- & 7-&" " -& %2& .%5&. 27 & %2".& %2" 2 5& ""2--&% "&- 52% -&- ,1,;'(
:#*
,
72-7&7 -&5 " %&75 %2& .-& 27%&-%2".& %2" 2 %& "2&" -&% 52%77& ,1,;'(
-2"& -"&"5 " &7" %2& 7& 2757&7%2".& %2" 25.7&- "2"&- 5&5 52." &. ,1,;'(
-25&5 -&" " &7 %2"--& 75-&% 27%"&-%2"%& %2" 255-&. "2.&" &% 52.5 &.5 ,1,;'(
-2.&" -&" " 5& %2"-.&7 7..&5 27.5&7%2"5&7 %2" 25"&- "25& 5& 52..5&5- ,1,;'(
-2""&% -&. " 5&" %2"-%&5 -& 277.&"%2"&5 %2" 2-%& "2 & &. 527"&5 ,1,;'(
-2""& - & " 5&"7 %2"-5&" --&% 2-&%2""&" %2" 2%-&% "2% & 5&5 527-&% ,1,;'(
-2"%"& -.& " &"% %2"-&- - %&% 2-"&7%2".&- %2" 25&% "2.7& .&5 527 .&- ,1,;'(
-2"-"&% -&7% " 5& %2"77& -75& 2- &.%2" & %2" 2" & "2-"& "5&" 5277 &75 ,1,;'(
'(
) ( %#"
(
*+
(
(
,-.
/(
/0(
!""(#
#
$%&
' (
.( !"0
()*" +
( $%&
' (
(
,++
*
6
8
;
678
<
678
435#/
6
8
45#
6
8
*+
6
8
*+
6
8
.
6
8
3
.
6
8
+
6
8
%
675&=8 *)
-2&% -&" " & " %2"7.&% "2"& 2-7&%2"5&% %2" 27-&" "2"& "&5 52-"&" ,1,;'(
-25-& 77&5% " .&-5 %2"7.&- "2%&. 2-5-&5%2"5&- %2" 2%&% "2""5&. "& 52--&- ,1,;'(
-275& 7-&. "%&"5 %2"77& "2%-&" 2-%"&%2" & %2" 2& "2"%& "&. 52-."&". ,1,;'(
-2"&5 -"& " "%.&%" %2"77& "2-%&% 2-%7&%%2" & %2" 2&7 "2"&- & 52-- &7 ,1,;'(
-25& 7-&7 "%-&7% %2"7.&7 "2"%&" 2-.5& %2"5&7 %2" 2".& "2"-&- -& 2&7% ,1,;'(
-2.& 77&.. "%7&5. %2"77& "2" &% 2-7&"%2" & %2" 2"5&7 "2"5 & &- 25 &%- ,1,;'(
-25& 7-&. "%%&7 %2"77& "2"75&% 2-7%&5%2" & %2" 2""5&7 "2" "&- %&5 2.&%7 ,1,;'(
-25& 7-&% "%& 5 %2"77&. "2"5& 2--5&%2" &. %2" 27 &" "2" -&7 "&. 2-.& ,1,;'(
-25%"&5 77&7- "%&.- %2"7-&" "25"&5 %2&%2"%&" %2" 2 7& "2"%7& "& 2"& 7 ,1,;'(
-25-"& -&%" "%&-- %2"77&. "2%-& %2"&7%2" &. %2" 2-&- "2".7& "& 2"5-&% ,1,;'(
-2 "& -& " %&.% %2"7.&5 "2-.&. %2&.%2"5&5 %2" 2"&. "2"7-& "5& 2"..& ,1,;'(
-2 "& -"&5. " &" %2"7%&5 "25& %2%&%2"&5 %2"52-. & "2"&. "& 25&.5 ,1,;'(
-2 7"& 7-&- "5%&%" %2"7%& "2 &7 %2 "& %2"& %2"52-57&% "2".& & 25& ,1,;'(
-2%"& -"&5 "5 &5 %2"7%&" "2.5&. %2%.&%%2"&" %2"52-5&7 "2& .&5 2%&5- ,1,;'(
-2%5"&" -&5 "5&- %2"7 & "2--&% %27 & %2"& %2"527--&7 "2 "& -&" 2-&7" ,1,;'(
-2%."& -&. "5&-% %2"7& "25& %2"&-%2"& %2"527.%& "2%-& 7&" 2&5 ,1,;'(
-2."&" -&" "7&5 %2"7"&. "255%&" %2"&%2""7&. %2"527 &5 "27-& -&7 2 &7 ,1,;'(
-2."& -& "%&- %2"7&5 "25%7&" %2"5&%%2"".&5 %2"527"&5 "2-& 7& 27& ,1,;'(
-2.%"&" -"&% "&%- %2".-& "257-& %2"%5&-%2""%& %2"527"& "2&% 7& 25"& ,1,;'(
-2.-"&" 7-& "&5" %2".-&" "2 -&5 %2"7.&%2""%&" %2"52.-&" "2 &- "& 255& ,1,;'(
-27&- 7.&. "7&-- %2"7& "2 7&5 %2"&"%2"".& %2"52.."& "2. &7 7&" 25."&- ,1,;'(
-27 &7 75&- ".&5 %2"7& "2 5%&7 %2& %2""-& %2"52. &7 "2--& -&7 2 "& ,1,;'(
-277& 75&75 "5&5 %2"75&7 "2 % & %2 7&7%2""&7 %2"52.5&% "255& 7&- 2 &7 ,1,;'(
-2-""& 75&" "&.5 %2"7.&% "2 7& %27&%2"5&% %2"52."-&" "2557&7 "&" 2 %&7 ,1,;'(
-2-%&5 7& "&5 %2"-&5 "2 -&. %25&%%2".&5 %2"52. &- "25.&5 &. 2 75&-% ,1,;'(
-2-."& 7&%7 "%&5 %2"-5&. "2%"&" %2&"%2""&. %2"52%7%&% "25-7&- "&% 2%"7&7% ,1,;'(
"2"&7 7& "&- %2"-7&5 "2%& %2 .&%2" &5 %2"52%%.&. "2 &7 "&. 2%5-&7 ,1,;'(
"2&7 75& ""&%" %2"& "2% &- %2.7&7%2"7& %2"52%57&7 "2 55&% %&5 2%..&7 ,1,;'(
"2%"& 7.& "5& %2&7 "2%."& %25&-%2"5&7 %2"52%7& "2 %%&. "& 2.7&. ,1,;'(
"2-&- 77&." "&-7 %25&- "2%-&" %25&%2"5"&- %2"52%.&% "2 77&" &7 2..&. ,1,;'(
"2"&. 7.& "%&-5 %2 &- "2."&5 %255&"%2"5&- %2"52 7%&5 "2%-& ""& 2.%.& ,1,;'(
"2" "& 7-&. "7&77 %2%&. "2. &- %25%&5%2"5&. %2"52 %&- "2%-& "& 2.-.&.. ,1,;'(
"2"7&. -&5 "5&%% %2%&. "2. 7&- %257&%2"5&. %2"52 5&- "2%57&" "&- 27.&. ,1,;'(
"2""& -&%5 "5&- %2%&5 "2.7& %2 &.%2"5&5 %2"52 "%&. "2%%%& "& 27 .& 5 ,1,;'(
"25&7 -"& "5"&" %2 &- "27%& %2 "7&-%2"5&- %2"525-&5 "2%75&7 .&" 277%&- ,1,;'(
"2.&. -"&7 "7& %2 &" "27-& %2 7&%2"5&" %2"525.&% "2.5& -& 2-"%&. ,1,;'(
"2&. -&% "%&" %25&7 "27 "& %2 7&.%2"5"&7 %2"52557&% "2.5&% 7&. 2-5%&." ,1,;'(
"2&% 77& % "5&7" %2 &" "27.& %2 .-&.%2"5&" %2"525.&5 "2.5 &% %&5 2-.%& - ,1,;'(
"2%"&" 7.& "&5- %2%& "27-&% %2%"&.%2"5& %2"525%&5 "2.%.&. 7&% %2.&% ,1,;'(
"2-& 77& ""&5 %2.& "2-"& %2%&%%2"55& %2"527%&. "2.7-& 5&. %2%&5 ,1,;'(
'(
) ( %#"
(
*+
(
(
,-.
/(
/0(
!""(#
#
$%&
' (
.( !"0
()*" +
( $%&
' (
(
,++
*
6
8
;
678
<
678
435#/
6
8
45#
6
8
*+
6
8
*+
6
8
.
6
8
3
.
6
8
+
6
8
%
675&=8 *)
"25&7 7-&- "-&-- %27& "2-& %2%5%& %2"5 & %2"52%.& "27"& %& %2%%&% ,1,;'(
"25 & 7-&% "7&.. %27& "2- "&7 %2%%-& %2"5 & %2"5257& "27 & 5& %2-%&" ,1,;'(
"257& -&5% "%&% %27& "2-.& %2%-&%2"5 & %2"52-&- "27 -& .&7 %2" &- ,1,;'(
"2 "&- -& "&-5 %27& "2-7.&. %2."7&%2"5 & %2"52"& "2775& 7&7 %2" &7% ,1,;'(
"2 5& -"&%- "&7 %2.&5 2&7 %2.5&-%2"55&5 %2"52-%& "2-7&- .&5 %2"75&7% ,1,;'(
"2 .&- -&5. "&5. %2%& 2"-&% %2.%7&7%2"5& %2"527& "2-5&7 .&- %2"5& ,1,;'(
"2%& - & ""-&5- %2&7 25& %2.-5&%2"5&7 %2"52% &7 "2-%&5 %& %25&.7 ,1,;'(
"2%"& -5&%. ""%&" %2"& 257&% %27"&5%2"7& %2"52 "& "2-7.& ""& %2.& ,1,;'(
"2%%&- -5&. ""&55 %2"-7&7 2%&7 %2757&5%2" &7 %2"52-&5 "2"5& "&5 %2--&. ,1,;'(
"2%-"&- -&"- "-& 5 %2"-%&. 2."&7 %27..&%2"&. %2"527& "25& "&% %2.&-% ,1,;'(
"2."& 7-& " &.7 %2"-%&" 27&. %2-5&-%2"&" %2"52"-& "2."& "7&7 %2 &.. ,1,;'(
"2. "&" 7%&- "&5 %2"-.&" 277& %2-5&"%2"5&" %2"52"& "2"& ""& %2.-&. ,1,;'(
"2.7& 7.&. "& %2"-7&. 2-5&% %2-%5&%2" &. %2"52 &. "2"&5 -&- %25 & . ,1,;'(
"27"& 7.&7 -.& %2& 2-7&7 %2--"&-%2".& %2"52"&5 "2" 7& ""&7 %257&" ,1,;'(
"275"& 7%&% -5&7 %2"&. 2""&- .2&-%2"7&. %2"52"-7&5 "2"7-& 7&. %25 & ,1,;'(
"27.&7 7.& -&5 %2&5 2"&. .2 &5%2"5&5 %2"52"-%&% "2"7& %&. %25.5& ,1,;'(
"2-"&5 7.&"" 7-&%- %25&- 2"5& .27&-%2"5"&- %2"52"-%&" "25-& 7&- %25-%&" ,1,;'(
"2-5"& 7%&% 7 &5" %2.&" 2"& .2"&7%2"55&" %2"52"-.&7 "277&- "&7 %2 & ,1,;'(
"2-. & 7%&% 7 &5" %2-&" 2--&- .2" %&%2"5%&" %2"52&% "2&5 & %2 5 &. ,1,;'(
'*
"2-..& 7%&% 7 &5" %2-& 2--&. .2" 7&%2"5%& %2"52&. "25&5 & %2 5%&. ,1,;'(
!"
!#$%&'&
()
* ) %#"
)
+,
)
)
'-.
/)
/0)
!"#"")$
$
%&'
( )
.) !"#"0
)*+" ,
) %&'
( )
)
-,,
+
*)
1*)
(
2)
**),"./(*01
,
)
"./(22)
3 4,,
3
,
56
!,
7-,, 1
771
1,1
/
/
%.")
%")
3
.)
.)
435#/
45#
1"%)
'
'
&3"&3.6'8
&3"& '/
'/"3)
'
/9/:'&8
"6.9 &: 8'8//-
/0
678
9".
6+8
* .
678
!"#"
"*.
#;;" "<8< " '. 8'// /3 '6..
),
)
"
)
. !"#"
"' +!
,) 9*6+,8
6
8
45#
6
8
678
435#/
6
8
+: )83&'
" '''&'
9*
6
8
.*
+*6/08
+
6
8
<<
;+ 14,
$= 7 ;+$
,
4"' 83&' ( )"<" <"">
-2-; 2-;- 83&6&' "36' !"#"( !"#")"<"<6>8>
6
8
;
678
<
678
435#/
6
8
45#
6
8
+,
6
8
+,
6
8
.
6
8
3
.
6
8
,
6
8
%
675&=8 +*
83&' 68' .'& &3"6' &""' 3 /'"&3&"' &3" 3&88' ""3/ ' '/ 63/'/" -2-;()
+;
*!#$
83&6&' 68' .'6 &3" 6'& &"'8 3&6'6&3."'& &3" 3&8&' ""3/&.'6 '" 63.&' -2-;()
:#+
/
83&/"' '. .6'.8 &3"/' &"6' 3&6' &3"/' &3" 3&86'8 ""3/8.' '. 636""'6 -2-;()
; "<*
83/"'. &&'./ .&'86 &3"86'8 &"/' 3& "'&3""'8 &3" 3&8' ""38"&' &'& 636'" -2-;()
; "<*
83/"'& /8'/ .8'6 &3".' &'/ 3&/.'&3"' &3" 3&/8' ""3866' 6' 636 6' . -2-;()
83/&"'8 8/'68 "&'6 &3"./' &/' 3/8'&3"6' &3" 3&/"'. ""38/' .' 636/.'8. -2-;()
; "<*
83/.' 88'/ ""&'6 &3".8' &8' 3/&' &3" ' &3" 3&&'8 ""3."' ' 63 /'&& -2-;()
838'8 .'/& "' &3".8' & 6'& 3/ .'8&3" ' &3" 3&66' ""3.6'. &"'8 63 '&/ -2-;()
838 ' 88' "66'" &3"./'& &/&'. 3//.'6&3"6'& &3" 3&' ""3.66'6 8'" 63 & ' -2-;()
()
* ) %#"
)
+,
)
)
'-.
/)
/0)
!"#"")$
$
%&'
( )
.) !"#"0
)*+" ,
) %&'
( )
)
-,,
+
6
8
;
678
<
678
435#/
6
8
45#
6
8
+,
6
8
+,
6
8
.
6
8
3
.
6
8
,
6
8
%
675&=8 +*
8388"'" 8/'8 "6.' &3".8'& /' 3/.&'&3" '& &3" 3 .&'/ ""3.&"' "8' 63 . '6 -2-;()
83."'" 88'8& " 6'66 &3"..' /'/ 38""'&3"&' &3" 3 &8' ""3./&' " '& 63& '/. -2-;()
83.6"'" 8.' " 8' . &3'" / &'6 38'&3"/'" &3" 3 6'8 ""3.8/'6 "6'8 63& "'8& -2-;()
83./'/ 8.'6 "&'" &3' /8/'" 38'&3"/' &3" 3 "'" ""3..8'6 "'. 63&8"'. -2-;()
.3"'" .' "&/'.8 &3'" 8"' 386'&3"/'" &3" 368 '/ "3 ' '. 63/6'./ -2-;()
.3"' .'&" "&8'/ &3"..' 86'. 386&' &3"&' &3" 36 &' "3""'/ '. 63/'" -2-;()
.3&"'" 88'8 "&8'6 &3"..' 8/' 38 ' &3"&' &3" 36/' "3"/'/ &'" 63/ '. -2-;()
.3."' 8/'/ "&6'"6 &3'6 ."'8 38 .'/&3"/'6 &3" 3./'6 "3 ' "6' 63/8"'"" -2-;()
.3""'6 8&'/ "&"'& &3"'. .' 38&8' &3"8'. &3" 3&8'. "3'8 .' 638/'6. -2-;()
.3" "' 8 '/. " 8' &36' . 8' 38/8'/&3"6"' &3" 36"' "366' ""' 6386'6 -2-;()
.3"8'8 8&' " &'6" &3&' .8 '6 38.'"&3"6' &3" 3"'8 "3 '6 &'& 638&"'/6 -2-;()
.3""' 8/' " '6 &3/'/ "3"' 3.'&3"66'/ &3" 38&' "3&8' .'. 638.'& -2-;()
.36"'" 8/'"8 " '8" &3.' "3.'& 3."&' &3"6&' &3" 3 .'/ "38"'8 '" 63."8'&6 -2-;()
.3/"' 8/'" " 6'8 &3"'& "3&&' 3..'/&3"6/'& &3" 3'8 "3. '" &'/ 63.6/'" -2-;()
.3'/ 8&' " /'.& &3"' "3.' 3.6"' &3"6.' &3" 3 '8 "3"&'. ""'" 63./6' -2-;()
.3' 8 '& " .'.. &3"6' "3""' 3. '&3" "' &3" 3"/8' "3""/'& /'6 3"'/ -2-;()
.3&'. 8"'86 "&'8 &3"/'. "3"6.'/ 3.&'&3" 6'. &3" 3"6.'& "3"/'/ ""'. 38'.6 -2-;()
.3.'/ 8"'6 "&'. &3' "3"//'& 3./'&3" .' &3" 3""'/ "3"/'6 "' 3 ' " -2-;()
.36' 8'"/ "&'. &3&' "3 '& 3.8"'"&3"&' &3" 3.'/ "3"6&'& 8'. 38"'8 -2-;()
.36 '6 8 '8 "&6' &3.' "36' 3.8.'&&3"&&' &3" 3& '" "3" ' /'/ 3"/'.. -2-;()
.368'& 8/'/& "&6'. &3"' "3&' 3../'/&3"&8' &3" 3&' "3"&' 8'. 3"6' -2-;()
.3 "'" .' "& ' &3"'/ "3.' &3&'&3"&8'/ &3" 3 '8 "3"/"'& .' 3"&"' . -2-;()
.3 6'8 .'& "& '"6 &3'/ "3"' &3"'6&3"&/'/ &3"63./8'" "3"/.' .'6 3"8&'6 -2-;()
.3 /"'" .'. "&'/ &38'8 "3 ' &3"'.&3"& '8 &3"63.6.'" "3"8/' .'/ 3"'. -2-;()
.3&'8 .6'/ "&'& &3&'& "3/8'6 &3"'6&3"&'& &3"63."' "3"./' &'" 3.' -2-;()
.3&"' .6' 8 " /' / &36'" "36&' &36'"&3"&"'" &3"638.'. "3/'/ "'" 3&&'./ -2-;()
.3&&"'" .6'6. " '/8 &3"'8 "366' &3 6'&3" 8'8 &3"638& '6 "3".'& '. 3.6'8 -2-;()
.3&."'" .6'8. " '6 &3".' "36&"'" &3&&'8&3" &' &3"6388' "3' /'. 3'6 -2-;()
.3/"' .6'.8 " "' &3"&'/ "368/'/ &38'/&3" '/ &3"638""'8 "36&'6 /'6 3 "'&/ -2-;()
.3/ '8 .6'& "68'6. &3"6' "3 "'" &3. ' &3" "' &3"63/8&' "3&"' .' 38'"6 -2-;()
.3/8'/ .6'6 "6 ' 6 &3""'. "3 8'" &3"""'8&3"68'. &3"63/&"'6 "3//' .'. 36.'8 -2-;()
.38"'. .' "6' &3.'8 "3 &'& &3".'&3"6&'8 &3"63/&'. "3. '" 8' 36.'" -2-;()
.386'8 .'/ "6'& &38'" "3 8&'" &3"6/'/&3"6 '" &3"63/"'6 "3"' .' 36&8'&8 -2-;()
.38/'/ ."'/ "/'/& &3/'" "3&8'/ &3"&/'&3"66'" &3"63&.'8 "3' ""'" 36.8'66 -2-;()
.3.'/ 8.'8 " '". &3&'. "3&' &3"8/'.&3"6'. &3"63&&.'" "3 '/ .' 3 8'6 -2-;()
.3.'. .'8 "'/ &3&'. "3& "' &3.'&&3"6'. &3"63&68' "3/ '6 &' 3 8'&6 -2-;()
.3.&'8 8.'&& ""' &3&'. "3&/"'/ &3"'/&3"6'. &3"63&/'. "3./' &'. 3 88'6. -2-;()
.3..'/ ."'& "' &3&'& "3&."'& &3 6'&3"6'& &3"63&8'" "36".'8 /' 3&"8' -2-;()
"3'8 .'/ ""' 6 &3 ' "3/""'/ &3/&'6&3"6' &3"63 88' "366' ' 3&68'6" -2-;()
"3 "'6 . ' "'" &3' "3/' &3.8'.&3"6' &3"63 &/' "36&6'/ 8'6 3&/8'8" -2-;()
()
* ) %#"
)
+,
)
)
'-.
/)
/0)
!"#"")$
$
%&'
( )
.) !"#"0
)*+" ,
) %&'
( )
)
-,,
+
6
8
;
678
<
678
435#/
6
8
45#
6
8
+,
6
8
+,
6
8
.
6
8
3
.
6
8
,
6
8
%
675&=8 +*
"38'8 ./'&. "' & &3"..'. "3/ ' &3'&3"&'. &3"63 6/'6 "368&' .' 3/8'. -2-;()
"3"""'" .&'& "'.8 &3".&' "3//' &36'6&3"' &3"63 /' "3 8' "' 3/8'" -2-;()
"3"6'& .8'6 ""'. &3".' "3/.'& &3&&'/&3".' &3"63 &'" "3 '& /' 3//' -2-;()
"3"/' ..'. ""'" &3"8/'. "38""' &38&' &3"6'. &3"63688'8 "3 '6 '/ 3/.&' -2-;()
"3'& ..' "8'/ &3"8'8 "38' &36.'6&3"".'8 &3"636&.'& "3 / '6 8' 38&'/ -2-;()
"3'& ..'8 "&'66 &3"//'. "3868' &36'.&3""6'. &3"636 "' "3 .8'. /' 38 '/" -2-;()
"3&"' ..' . "6'6 &3"/'. "38& '/ &36 /'&&3".'. &3"6366'" "3&' /' 388 '6& -2-;()
"3.'8 ..'6& ""'&" &3"&8' "388"'& &368'&3" ' &3"636"8' "3&68' 8'8 3."'. -2-;()
"3"' ..' . ""8'. &3"&' "38.&'& &3 8'&3"' &3"636' "3&/6' "'8 3.6'.6 -2-;()
"3 '& ..'6 ""&'. &3" 8'" "3..'8 &3 '8&3. '" &3"63.' "3&..'8 &'/ 3./' 6 -2-;()
"3& ' ..'6 ""6'/ &3" '/ "3."&' &3 6/'&3.'/ &3"638'/ "3/"' "' 3.86'& -2-;()
"36' ..'6 ""6'/ &3" ' "3.'6 &3 //'.&38/' &3"63&.' "3/6'. ' &3"&'" -2-;()
(+
T + 1 337.856-7201
1058 Baker Hughes Drive
Broussard, LA 70518, USA
March 3, 2022
AOGCC
Attention: Natural Resources Technician
333 W. 7th Ave., Suite 100
Anchorage, Alaska 99501-3539
Subject:Final Log Distribution for ConocoPhillips Alaska, Inc.
3M-05L1
Kuparuk River
API #: 50-029-21706-60-00
Permit No: 221-107
Rig: CDR3
The final Coil deliverables were uploaded via https://copsftp.sharefile.com/ for the above well.
Items delivered: Digital Las Data, Graphic Images CGM/PDF and Survey Files.
Thank you.
Signature of receiver & date received:
Please return transmittal letter to:
Jenny Jones
Jenny.E.Jones@conocophillips.com
A. Carolina Martinez
Arelys.Martinez@bakerhughes.com
221-107
T36397
Meredith Guhl Digitally signed by Meredith Guhl
Date: 2022.03.04 10:53:53 -09'00'
T + 1 337.856-7201
1058 Baker Hughes Drive
Broussard, LA 70518, USA
March 3, 2022
AOGCC
Attention: Natural Resources Technician
333 W. 7th Ave., Suite 100
Anchorage, Alaska 99501-3539
Subject:Final Log Distribution for ConocoPhillips Alaska, Inc.
3M-05L1PB1
Kuparuk River
API #: 50-029-21706-70-00
Permit No: 221-107
Rig: CDR3
The final Coil deliverables were uploaded via https://copsftp.sharefile.com/ for the above well.
Items delivered: Digital Las Data, Graphic Images CGM/PDF and Survey Files.
Thank you.
Signature of receiver & date received:
Please return transmittal letter to:
Jenny Jones
Jenny.E.Jones@conocophillips.com
A. Carolina Martinez
Arelys.Martinez@bakerhughes.com
221-107
T36398
Meredith Guhl Digitally signed by Meredith Guhl
Date: 2022.03.04 10:56:22 -09'00'
STATE OF ALASKA Reviewed By: `T RI
OIL AND GAS CONSERVATION COMMISSION P. I. Supry 2 1 Z 2111-
BOPE Test Report for: KUPARUK RIV UNIT 3M -05L1 Comm
Contractor/Rig No.: Nabors CDR3AC PTD#: 2211070 DATE: 1/21/2022 Inspector Guy Cook Insp Source
Operator: ConocoPhillips Alaska, Inc. Operator Rep: J. Newell/Chase Erdman Rig Rep: C. Coyne/ K. Endfield Inspector
Type Operation: DRILL Sundry No: Test Pressures: Inspection No: bopGDC220119190429
Rams: Annular: Valves: MASP:
Type Test: INIT 250/5000 - 250/2500 , 250/5000 - 4479, Related Insp No:
MISC. INSPECTIONS:
FLOOR SAFTY VALVES:
P/F
Location Gen.:
P
Housekeeping:
P
PTD On Location
P
Standing Order Posted
--P
Well Sign
P_
Drl. Rig
P
Hazard Sec.
P
Misc
NA
FLOOR SAFTY VALVES:
TEST DATA
MUD SYSTEM:
Quantity
P/F
Upper Kelly
0 _
NA_"
Lower Kelly
_ 0
NA
Ball Type
_ 2 "
P _
Inside BOP
0
NA -
FSV Misc
0
NA'
TEST DATA
MUD SYSTEM:
ACCUMULATOR SYSTEM:
Visual Alarm
Time/Pressure P/F
Trip Tank
_NA- NA
System Pressure 3000_ P_ _-
Pit Level Indicators
P P
Pressure After Closure 2400 P
Flow Indicator
P P
200 PSI Attained 23 P
Meth Gas Detector
P P '
Full Pressure Attained _48 -P
H2S Gas Detector
P P -
Blind Switch Covers: All Stations ' P
MS Misc
NA_ NA
Nitgn. Bottles (avg): 4(&,1920 P
ACC Misc 0 NA
BOP STACK:
CHOKE MANIFOLD:
Quantity Size
P/F Quantity P/F
Stripper 1 -
2"_ -_-
NT No. Valves 12 _ P
Annular Preventer 1
7 1/16" 5000 - P Manual Chokes 1 P "
#1 Rams ---I-
Blind/Sh_ear_ -
P_-_ Hydraulic Chokes --_1 -__ _-P
#2 Rams I -
2" Solid
P - CH Misc 0 NA
#3 Rams 1 -
2 3/8" Solid -
P
#4 Rams 1
2" Solid
P "
#5 Rams 0
NA INSIDE REEL VALVES:
#6 Rams 0
NA (Valid for Coil Rigs Only)
_
Choke Ln. Valves 1
2 1/16" 5000
P- Quantity P/F
HCR Valves 2
2 1/16" 5000,
P Inside Reel Valves 1 NT -
Kill Line Valves 5 -
2 1/16" 5000 -
FP
Check Valve 0
NA
BOP Misc 1
_Flange- ,
FP-✓
Number of Failures: 2 ✓ Test Results Test Time 10
Remarks: A combination 2"x 2 3/8" test joint was used for testing. On test #3 the flange on the top of the mud cross started to leak on the
high. The flange was tightened and the test was done again for a pass. This test is captured in BOP Misc. During test #5 the
kill line valve R-03 failed. The valve was serviced and passed the retest. Tested the recovery times for the accumulator
system. The results were as follows: Annular - 10 seconds, Upper Rams - 4 seconds, Lower Rams 2" - 5 seconds, Lower
Rams 2 3/8" - 3 seconds, HCR Kill - 1 second, HCR Choke - 1.5 seconds, Blinds (simulated) - 3.5 seconds. The precharge for
all eight charge bottles were checked and were as follows starting at bottle 1 to bottle 8: 1150, 1150, 1150, 1150, 1150, 1180,
1100, 1100. 1 did not stay for the testing of the Inside Reel Valve or the Stripper.
,�Frl
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Ty Senden
CTD/RWO Engineering Director
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage, AK 99510
Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 3M-05L1
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 221-107
Surface Location: 1204’ FNL, 1703’ FEL, SEC. 25, T13N, R8E, UM
Bottomhole Location: 1880’ FSL, 76’ FWL, SEC. 29, T13N, R9E, UM
Dear Mr. Senden:
Enclosed is the approved application for the permit to drill the above referenced well.
The permit is for a new wellbore segment of existing well Permit 187-025, API 50-029-21706-00-
00.Production should continue to be reported as a function of the original API number stated
above.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs
run must be submitted to the AOGCCwithin 90days after completion, suspension or abandonment
of this well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Jeremy M. Price
Chair
DATED this ___ day of December, 2021.
Jeremy Price
Digitally signed by
Jeremy Price
Date: 2021.12.20
13:32:53 -09'00'
D7\SHRI:RUN E3URSRVHG:HOO&ODVV ([SORUDWRU\*DV 6HUYLFH:$* 6HUYLFH'LVS F6SHFLI\LIZHOOLVSURSRVHGIRU
'ULOO /DWHUDO 6WUDWLJUDSKLF7HVW 'HYHORSPHQW2LO 6HUYLFH:LQM 6LQJOH=RQH &RDOEHG*DV *DV+\GUDWHV
5HGULOO 5HHQWU\ ([SORUDWRU\2LO 'HYHORSPHQW*DV 6HUYLFH6XSSO\ 0XOWLSOH=RQH *HRWKHUPDO 6KDOH*DV
2SHUDWRU1DPH %RQG %ODQNHW 6LQJOH:HOO :HOO1DPHDQG1XPEHU
%RQG1R
$GGUHVV 3URSRVHG'HSWK )LHOG3RROV
0'
79'
D/RFDWLRQRI:HOO*RYHUQPHQWDO6HFWLRQ 3URSHUW\'HVLJQDWLRQ
6XUIDFH
7RSRI3URGXFWLYH+RUL]RQ '15$SSURYDO1XPEHU $SSUR[LPDWH6SXG'DWH
7RWDO'HSWK$FUHVLQ3URSHUW\'LVWDQFHWR1HDUHVW3URSHUW\
E/RFDWLRQRI:HOO6WDWH%DVH3ODQH&RRUGLQDWHV1$' .%(OHYDWLRQDERYH06/IW 'LVWDQFHWR1HDUHVW:HOO2SHQ
6XUIDFH[\=RQH WR6DPH3RRO
,/
'HYLDWHGZHOOV .LFNRIIGHSWK IHHW 0D[LPXP3RWHQWLDO3UHVVXUHVLQSVLJVHH$$&
0D[LPXP+ROH$QJOH GHJUHHV 'RZQKROH 6XUIDFH
+ROH &DVLQJ :HLJKW *UDGH &RXSOLQJ /HQJWK 0' 79' 0' 79'
/ 67/
35(6(17:(//&21',7,216800$5<7REHFRPSOHWHGIRU5HGULOODQG5H(QWU\2SHUDWLRQV
-XQNPHDVXUHG
79'
+\GUDXOLF)UDFWXUHSODQQHG" <HV 1R
$WWDFKPHQWV 3URSHUW\3ODW %236NHWFK 'ULOOLQJ3URJUDP 7LPHY'HSWK3ORW 6KDOORZ+D]DUG$QDO\VLV
'LYHUWHU6NHWFK 6HDEHG5HSRUW 'ULOOLQJ)OXLG3URJUDP $$&UHTXLUHPHQWV
&RQWDFW1DPH 6KDQH*HUPDQQ
7\6HQGHQ &RQWDFW(PDLO6KDQH*HUPDQQ#FRQRFRSKLOOLSVFRP
&7'5:2(QJLQHHULQJ'LUHFWRU &RQWDFW3KRQH
'DWH
3HUPLWWR'ULOO $3,1XPEHU 3HUPLW$SSURYDO
1XPEHU'DWH
&RQGLWLRQVRIDSSURYDO ,IER[LVFKHFNHGZHOOPD\QRWEHXVHGWRH[SORUHIRUWHVWRUSURGXFHFRDOEHGPHWKDQHJDVK\GUDWHVRUJDVFRQWDLQHGLQVKDOHV
6DPSOHVUHT
G<HV1R 0XGORJUHT
G<HV1R
+6PHDVXUHV<HV1R 'LUHFWLRQDOVY\UHT
G<HV1R
6SDFLQJH[FHSWLRQUHT
G<HV1R ,QFOLQDWLRQRQO\VY\UHT
G<HV1R
3RVWLQLWLDOLQMHFWLRQ0,7UHT
G<HV1R
$33529('%<
$SSURYHGE\ &200,66,21(5 7+(&200,66,21 'DWH
&RPP &RPP 6U3HW(QJ 6U3HW*HR 6U5HV(QJ
.580/
.XSDUXN5LYHU3RRO
.XSSDUXN5LYHU2LO3RRO
&HPHQW4XDQWLW\FIRUVDFNV
&RPPLVVLRQ8VH2QO\
6HHFRYHUOHWWHUIRURWKHU
UHTXLUHPHQWV
V[&6,,WRSMRE
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
3(50,772'5,//
$$&
)1/
)(/6HF715(80
)6/
):/6HF715(80
/216
32%R[$QFKRUDJH$.
&RQRFR3KLOOLSV$ODVND,QF
)1/
)(/6HF715(80 $'/$'/
&DVLQJ3URJUDP 7RS6HWWLQJ'HSWK%RWWRP6SHFLILFDWLRQV
LQFOXGLQJVWDJHGDWD
6ORWWHGZDOXPLQXPELOOHW
$XWKRUL]HG7LWOH
$XWKRUL]HG6LJQDWXUH
V[&ODVV* V[&6,3URGXFWLRQ
$XWKRUL]HG1DPH
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEH
GHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
6XUIDFH
3HUIRUDWLRQ'HSWK79'IW
*/%)(OHYDWLRQDERYH06/IW
3HUIRUDWLRQ'HSWK0'IW
V[&6,,
V[&6,,, V[&ODVV*
(IIHFW'HSWK0'IW
&RQGXFWRU6WUXFWXUDO
/HQJWK
.3$ERXQGDU\
(IIHFW'HSWK79'IW
&DVLQJ
1RQH
&HPHQW9ROXPH 0'6L]H
3OXJVPHDVXUHG
6WUDWLJUDSKLF7HVW
1R 0XGORJUHT
G<HV1R
1R 'LUHFWLRQDOVY\UHT
G<HV1R
6HDEHG5HSRUW'ULOOLQJ)OXLG3URJUDP $$&UHTXLUHPHQWV
%236NHWFK'ULOOLQJ3URJUDP 7LPHY'HSWK3ORW 6KDOORZ+D]DUG$QDO\VLV
6LQJOH:HOO
*DV+\GUDWHV
1R ,QFOLQDWLRQRQO\VY\UHT
G<HV1R
([SORUDWRU\2LO 'HYHORSPHQW*DV 6HUYLFH6XSSO\ 0XOWLSOH=RQH *HRWKHUPDO
1R
1R
)RUP5HYLVHG7KLVSHUPLWLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDOSHU$$&J
By Samantha Carlisle at 8:56 pm, Dec 08, 2021
'LJLWDOO\VLJQHGE\57\OHU6HQGHQ
'1&1 57\OHU6HQGHQ2 ,QWHUYHQWLRQDQG,QWHJULW\28 $.:HOOV
( UW\OHUVHQGHQ#FRQRFRSKLOOLSVFRP& 86
5HDVRQ,DPWKHDXWKRURIWKLVGRFXPHQW
/RFDWLRQ\RXUVLJQLQJORFDWLRQKHUH'DWH
)R[LW3')(GLWRU9HUVLRQ
57\OHU6HQGHQ
;
'/%
;
;
; ;
97/
;
%23 WHVW SUHVVXUH WR SVLJ
$QQXODU WHVW SUHVVXUH WR SVLJ
;
;
'65dts 12/20/2021
12/20/21
Jeremy Price Digitally signed by Jeremy Price
Date: 2021.12.20 13:33:06 -09'00'
32%2;
$1&+25$*($/$6.$
'HFHPEHU
&RPPLVVLRQHU6WDWHRI$ODVND
$ODVND2LO *DV&RQVHUYDWLRQ&RPPLVVLRQ
:HVWWK$YHQXH6XLWH
$QFKRUDJH$ODVND
'HDU&RPPLVVLRQHU
&RQRFR3KLOOLSV$ODVND,QFKHUHE\VXEPLWVDSSOLFDWLRQVIRUSHUPLWVWRGULOOIRXUODWHUDOVRXWRIWKH.580
37'XVLQJWKHFRLOHGWXELQJGULOOLQJULJ1DERUV&'5$&
&7'RSHUDWLRQVDUHVFKHGXOHGWREHJLQLQODWH'HFHPEHU7KHREMHFWLYHZLOOEHWRGULOOIRXUODWHUDOV.58
0/0/0/DQG0/WDUJHWLQJWKH.XSDUXN$VDQGLQWHUYDO
$5:2LVFXUUHQWO\XQGHUZD\RQ0DVRIWRLQVWDOO7DQGHP:HGJHVWRIDFLOLWDWH&7'RSHUDWLRQV
7RDFFRXQWIRUJHRORJLFDOXQFHUWDLQWLHV&RQRFR3KLOOLSVUHTXHVWVDYDULDQFHIURPWKHUHTXLUHPHQWVRI
$$&WRDOORZWKHDFWXDONLFNRIISRLQWWREHDQ\ZKHUHDORQJWKHOHQJWKRIWKHSDUHQWODWHUDOLQVWHDGRI
EHLQJOLPLWHGWR¶IURPWKHRULJLQDOSRLQW
$WWDFKHGWRSHUPLWWRGULOODSSOLFDWLRQVDUHWKHIROORZLQJGRFXPHQWV
3HUPLWWR'ULOO$SSOLFDWLRQ)RUPVIRU0/0/0/DQG0/
'HWDLOHG6XPPDU\RI2SHUDWLRQV
'LUHFWLRQDO3ODQVIRU0/0/0/DQG0/
&XUUHQW:HOOERUH6FKHPDWLF
3URSRVHG&7'6FKHPDWLF
,I\RXKDYHDQ\TXHVWLRQVRUUHTXLUHDGGLWLRQDOLQIRUPDWLRQSOHDVHFRQWDFWPHDW
6LQFHUHO\
6KDQH*HUPDQQ
&RLOHG7XELQJ'ULOOLQJ(QJLQHHU
&RQRFR3KLOOLSV$ODVND
'LJLWDOO\VLJQHGE\6KDQH*HUPDQQ
'12 &RQRFR3KLOOLSV$ODVND&1 6KDQH
*HUPDQQ( VKDQHJHUPDQQ#FRSFRP
5HDVRQ,DPWKHDXWKRURIWKLVGRFXPHQW
/RFDWLRQ\RXUVLJQLQJORFDWLRQKHUH
'DWH
)R[LW3')(GLWRU9HUVLRQ
.XSDUXN&7'/DWHUDOV
0/0/0/ 0/
Application for Permit to Drill Document
3DJHRI 'HFHPEHU
:HOO1DPHDQG&ODVVLILFDWLRQ
(Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b)) .................................................................................................................. 2
/RFDWLRQ6XPPDU\
(Requirements of 20 AAC 25.005(c)(2)) ................................................................................................................................................. 2
%ORZRXW3UHYHQWLRQ(TXLSPHQW,QIRUPDWLRQ
(Requirements of 20 AAC 25.005 (c)(3)) ................................................................................................................................................ 2
'ULOOLQJ+D]DUGV,QIRUPDWLRQDQG5HVHUYRLU3UHVVXUH
(Requirements of 20 AAC 25.005 (c)(4)) ................................................................................................................................................ 2
3URFHGXUHIRU&RQGXFWLQJ)RUPDWLRQ,QWHJULW\WHVWV
(Requirements of 20 AAC 25.005(c)(5)) ................................................................................................................................................. 2
&DVLQJDQG&HPHQWLQJ3URJUDP
(Requirements of 20 AAC 25.005(c)(6)) ................................................................................................................................................. 3
'LYHUWHU6\VWHP,QIRUPDWLRQ
(Requirements of 20 AAC 25.005(c)(7)) ................................................................................................................................................. 3
'ULOOLQJ)OXLGV3URJUDP
(Requirements of 20 AAC 25.005(c)(8)) ................................................................................................................................................. 3
$EQRUPDOO\3UHVVXUHG)RUPDWLRQ,QIRUPDWLRQ
(Requirements of 20 AAC 25.005(c)(9)) ................................................................................................................................................. 4
6HLVPLF$QDO\VLV
(Requirements of 20 AAC 25.005(c)(10)) ............................................................................................................................................... 4
6HDEHG&RQGLWLRQ$QDO\VLV
(Requirements of 20 AAC 25.005(c)(11)) ............................................................................................................................................... 4
(YLGHQFHRI%RQGLQJ
(Requirements of 20 AAC 25.005(c)(12)) ............................................................................................................................................... 4
3URSRVHG'ULOOLQJ3URJUDP
(Requirements of 20 AAC 25.005(c)(13)) ............................................................................................................................................... 4
6XPPDU\RI2SHUDWLRQV
/LQHU5XQQLQJ
'LVSRVDORI'ULOOLQJ0XGDQG&XWWLQJV
(Requirements of 20 AAC 25.005(c)(14)) ............................................................................................................................................... 6
'LUHFWLRQDO3ODQVIRU,QWHQWLRQDOO\'HYLDWHG:HOOV
(Requirements of 20 AAC 25.050(b)) ..................................................................................................................................................... 6
$WWDFKPHQWV
$WWDFKPHQW'LUHFWLRQDO3ODQVIRU0/0/0/ 0/ODWHUDOV
$WWDFKPHQW&XUUHQW:HOO6FKHPDWLFIRU*
$WWDFKPHQW3URSRVHG:HOO6FKHPDWLFIRU0/0/0/ 0/ODWHUDOV
37'$SSOLFDWLRQ0/0/0/ 0/
3DJHRI 'HFHPEHU
:HOO1DPHDQG&ODVVLILFDWLRQ
(Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b))
7KHSURSRVHGODWHUDOVGHVFULEHGLQWKLVGRFXPHQWDUH0/0/0/ 0/$OO
ODWHUDOVZLOOEHFODVVLILHGDV³Service´ZHOOV
/RFDWLRQ6XPPDU\
(Requirements of 20 AAC 25.005(c)(2))
7KHVHODWHUDOVZLOOWDUJHWWKH$VDQGSDFNDJHLQWKH.XSDUXNUHVHUYRLU6HHDWWDFKHGIRUPIRUVXUIDFH
DQGVXEVXUIDFHFRRUGLQDWHVRIWKH0/0/0/ 0/
%ORZRXW3UHYHQWLRQ(TXLSPHQW,QIRUPDWLRQ
(Requirements of 20 AAC 25.005 (c)(3))
3OHDVHUHIHUHQFHEORZRXWSUHYHQWLRQ%23VFKHPDWLFVRQILOHZLWKWKH&RPPLVVLRQIRU1DERUV&'5$&
%23HTXLSPHQWLVDVUHTXLUHGSHU$$&IRUWKUXWXELQJGULOOLQJRSHUDWLRQV
3LSHUDPVEOLQGUDPVDQGWKH&7SDFNRIIZLOOEHSUHVVXUHWHVWHGWRSVLDQGWRSVL8VLQJWKH
PD[LPXPIRUPDWLRQSUHVVXUHLQWKHDUHDRISVLLQ0LHSSJ(0:WKHPD[LPXP
SRWHQWLDOVXUIDFHSUHVVXUHLQ0DVVXPLQJDJDVJUDGLHQWRISVLIWZRXOGEHSVL6HHWKH
³Drilling Hazards Information and Reservoir Pressure´VHFWLRQIRUPRUHGHWDLOV
7KHDQQXODUSUHYHQWHUZLOOEHWHVWHGWRSVLDQGSVL
'ULOOLQJ+D]DUGV,QIRUPDWLRQDQG5HVHUYRLU3UHVVXUH
(Requirements of 20 AAC 25.005 (c)(4)
Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a))
7KHIRUPDWLRQSUHVVXUHLQ.580ZDVPHDVXUHGWREHSVLDW79'SSJ(0:RQ
7KHPD[LPXPGRZQKROHSUHVVXUHLQWKH0YLFLQLW\LVWRWKHVRXWKZHVWLQWKH03UHVVXUH
ZDVPHDVXUHGWREHSVLDW79'6:+3FRQYHUWHGWR%+3SSJ(0:RQ
Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b))
7KHUHLVDSRVVLELOLW\RIHQFRXQWHULQJIUHHJDVZKLOHGULOOLQJWKH0ODWHUDOVGXHWRSUHYLRXVJDVLQMHFWLRQLQ
WKHDUHD,IJDVLVGHWHFWHGLQWKHUHWXUQVWKHFRQWDPLQDWHGPXGFDQEHGLYHUWHGWRDVWRUDJHWDQNDZD\IURP
WKHULJ
Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c))
7KHPDMRUH[SHFWHGULVNRIKROHSUREOHPVLQWKH0ODWHUDOVZLOOEHVKDOHLQVWDELOLW\DFURVVIDXOWV0DQDJHG
SUHVVXUHGULOOLQJ03'ZLOOEHXVHGWRUHGXFHWKHULVNRIVKDOHLQVWDELOLW\DVVRFLDWHGZLWKIDXOWFURVVLQJV
3URFHGXUHIRU&RQGXFWLQJ)RUPDWLRQ,QWHJULW\WHVWV
(Requirements of 20 AAC 25.005(c)(5))
7KH0ODWHUDOVZLOOEHGULOOHGXQGHU $$&IRUWKUXWXELQJGULOOLQJRSHUDWLRQVVRDIRUPDWLRQLQWHJULW\
WHVWLVQRWUHTXLUHG
37'$SSOLFDWLRQ0/0/0/ 0/
3DJHRI 'HFHPEHU
&DVLQJDQG&HPHQWLQJ3URJUDP
(Requirements of 20 AAC 25.005(c)(6))
New Completion Details
/DWHUDO1DPH/LQHU7RS
0'
/LQHU%WP
0'
/LQHU7RS
79'66
/LQHU%WP
79'66/LQHU'HWDLOV
0/¶ ¶ ¶ ¶
/67/VORWWHGOLQHU
DOXPLQXPELOOHWRQWRS
0/ ¶ ¶ ¶ ¶
/67/VORWWHGOLQHU
DOXPLQXPELOOHWRQWRS
0/ ¶ ¶ ¶ ¶
/67/VORWWHGOLQHU
DOXPLQXPELOOHWRQWRS
0/¶ ¶ ¶ ¶
/67/VORWWHGOLQHU
ZLWKVKRUW\GHSOR\PHQWVOHHYHRQWRS
Existing Casing/Liner Information
&DWHJRU\ 2'
:HLJKW
SSI*UDGH &RQQHFWLRQ 7RS0' %WP0'
7RS
79'
%WP
79'
%XUVW
SVL
&ROODSVH
SVL
&RQGXFWRU ´ + :HOGHG ¶ ¶ ¶ ¶
6XUIDFH ´ - %7& ¶ ¶ ¶ ¶
3URGXFWLRQ ´ - %7& ¶ ¶ ¶ ¶
'LYHUWHU6\VWHP,QIRUPDWLRQ
Requirements of 20 AAC 25.005(c)(7)
1DERUV&'5$&ZLOOEHRSHUDWLQJXQGHU$$&IRUWKUXWXELQJGULOOLQJRSHUDWLRQV7KHUHIRUHD
GLYHUWHUV\VWHPLVQRWUHTXLUHG
'ULOOLQJ)OXLGV3URJUDP
(Requirements of 20 AAC 25.005(c)(8))
Diagram of Drilling System
$GLDJUDPRIWKH1DERUV&'5$&PXGV\VWHPLVRQILOHZLWKWKH&RPPLVVLRQ
Description of Drilling Fluid System
:LQGRZPLOOLQJRSHUDWLRQV:DWHU%DVHG3RZHU9LVPLOOLQJIOXLGSSJ
'ULOOLQJRSHUDWLRQV:DWHUEDVHG3RZHU9LVPXGSSJThis mud weight will not hydrostatically
overbalance the reservoir pressure, overbalanced conditions will be maintained using MPD practices
described below.
&RPSOHWLRQRSHUDWLRQV7KHZHOOZLOOEHORDGHGZLWKaSSJ1D%UFRPSOHWLRQIOXLGLQRUGHUWR
SURYLGHIRUPDWLRQRYHUEDODQFHDQGZHOOERUHVWDELOLW\ZKLOHUX QQLQJFRPSOHWLRQV
Managed Pressure Drilling Practice
0DQDJHGSUHVVXUHGULOOLQJ03'WHFKQLTXHVZLOOEHHPSOR\HGWRPDLQWDLQDFRQVWDQWRYHUEDODQFHGSUHVVXUHRQ
WKHRSHQKROHIRUPDWLRQDQGSURPRWHZHOOERUHVWDELOLW\WKURXJKRXWWKHFRLOHGWXELQJGULOOLQJ&7'SURFHVV0XG
ZHLJKWLVQRWLQPDQ\FDVHVWKHSULPDU\ZHOOFRQWUROEDUULHU7KLVLVVDWLVILHGZLWKWKHSVLUDWHGFRLOHG
WXELQJSDFNRIIDQG03'FKRNH%23(HTXLSPHQWSURYLGHVWKHVHFRQGDU\ZHOOFRQWURODVGHWDLOHGLQVHFWLRQ
³%ORZRXW3UHYHQWLRQ(TXLSPHQW,QIRUPDWLRQ´
,QWKH0ODWHUDOVZHZLOOWDUJHWDFRQVWDQW%+3RIaSSJ(0:DWWKHZLQGRZ7KHFRQVWDQW%+3WDUJHW
ZLOOEHDGMXVWHGWKURXJKFKRNHSUHVVXUHDQGRUPXGZHLJKWLQFUHDVHVWRPDLQWDLQRYHUEDODQFHGFRQGLWLRQVLI
LQFUHDVHGUHVHUYRLUSUHVVXUHLVHQFRXQWHUHG$GGLWLRQDOFKRNHSUHVVXUHRULQFUHDVHGPXGZHLJKWPD\DOVREH
HPSOR\HGIRULPSURYHGERUHKROHVWDELOLW\$Q\FKDQJHRIFLUFXODWLQJIULFWLRQSUHVVXUHGXHWRFKDQJHLQSXPSUDWHV
RUFKDQJHLQGHSWKRIFLUFXODWLRQZLOOEHRIIVHWZLWKEDFNSUHVVXUHDGMXVWPHQWV
Managed Pressure Drilling Practice
0DQDJHGSUHVVXUHGULOOLQJ03'WHFKQLTXHVZLOOEHHPSOR\HGWRPDLQWDLQDFRQVWDQWRYHUEDODQFHGSUHVVXUHRQJS J T S\S
WKHRSHQKROHIRUPDWLRQDQGSURPRWHZHOOERUHVWDELOLW\WKURXJKRXWWKHFRLOHGWXELQJGULOOLQJ&7'SURFHVV0XGSS \J
ZHLJKWLVQRWLQPDQ\FDVHVWKHSULPDU\ZHOOFRQWUROEDUULHU
,QWKH0ODWHUDOVZHZLOOWDUJHWDFRQVWDQW%+3RIaSSJ(0:DWWKHZLQGRZ
'/%
37'$SSOLFDWLRQ0/0/0/ 0/
3DJHRI 'HFHPEHU
3UHVVXUHDWWKH0:LQGRZ¶0'¶79'8VLQJ03'
3XPSV2QESP3XPSV2II
$VDQG)RUPDWLRQ3UHVVXUHSSJ SVL SVL
0XG+\GURVWDWLFSSJ SVL SVL
$QQXODUIULFWLRQLH(&'SVLIW SVL SVL
0XG(&'&RPELQHG
QRFKRNHSUHVVXUH
SVL
RYHUEDODQFHGaSVL
SVL
XQGHUEDODQFHGaSVL
7DUJHW%+3DW:LQGRZSSJ SVL SVL
&KRNH3UHVVXUH5HTXLUHGWR0DLQWDLQ
7DUJHW%+3SVL SVL
$EQRUPDOO\3UHVVXUHG)RUPDWLRQ,QIRUPDWLRQ
(Requirements of 20 AAC 25.005(c)(9))
1$$SSOLFDWLRQLVQRWIRUDQH[SORUDWRU\RUVWUDWLJUDSKLFWHVWZHOO
6HLVPLF$QDO\VLV
(Requirements of 20 AAC 25.005(c)(10))
1$$SSOLFDWLRQLVQRWIRUDQH[SORUDWRU\RUVWUDWLJUDSKLFWHVWZHOO
6HDEHG&RQGLWLRQ$QDO\VLV
(Requirements of 20 AAC 25.005(c)(11))
1$$SSOLFDWLRQLVIRUDODQGEDVHGZHOO
(YLGHQFHRI%RQGLQJ
(Requirements of 20 AAC 25.005(c)(12))
(YLGHQFHRIERQGLQJIRU&RQRFR3KLOOLSV$ODVND,QFLVRQILOHZLWKWKH&RPPLVVLRQ
3URSRVHG'ULOOLQJ3URJUDP
Requirements of 20 AAC 25.005(c)(13
Summary of Operations
.58ZHOO0LVD.XSDUXN$6DQGSURGXFHUHTXLSSHGZLWK´WXELQJDQG´SURGXFWLRQFDVLQJ0LV
FXUUHQWO\EHLQJZRUNHGRYHUWRLQVWDOOD7DQGHP:HGJHWRIDFLOLWDWH&7'RSHUDWLRQV7KH&7'VLGHWUDFNZLOOXWLOL]H
IRXUODWHUDOVWRWDUJHWWKH$VDQGVWRWKHQRUWKDQGVRXWKHDVWRI07KH0&7'ODWHUDOVZLOOLQFUHDVH$
VDQGUHVRXUFHUHFRYHU\DQGWKURXJKSXW
3ULRUWR&7'ULJXS(/LQHZLOOVHWDPHFKDQLFDOZKLSVWRFNLQQHUZHGJHLQVLGHWKH´WXELQJDWWKHSODQQHG
NLFNRIISRLQWRI¶0'7KH0/ODWHUDOZLOOH[LWWKURXJKWKH´WXELQJDQG´FDVLQJDW¶0'DQG
GULOOWRDSODQQHG7'DW¶0'WDUJHWLQJWKH$VDQGWRWKHVRXWKHDVW7KHODWHUDOZLOOEHFRPSOHWHGZLWK
´VORWWHGOLQHUIURP7'XSWR¶0'ZLWKDQDOXPLQXPELOOHWIRUNLFNLQJRII
7KH0/ODWHUDOZLOONLFNRIIDW¶0'DQGGULOOWRDSODQQHG7'RI¶0'WDUJHWLQJWKH$VDQGWR
WKHVRXWKHDVW,WZLOOEHFRPSOHWHGZLWK´VORWWHGOLQHUIURP7'XSWR¶0'ZLWKDQDOXPLQXPELOOHWIRU
NLFNLQJRII
7KH0/ODWHUDOZLOONLFNRIIDW¶0'DQGGULOOWRDSODQQHG7'RI¶0'WDUJHWLQJWKH$VDQGWR
WKHQRUWK,WZLOOEHFRPSOHWHGZLWK´VORWWHGOLQHUIURP7'XSWR¶0'ZLWKDQDOXPLQXPELOOHWIRU
NLFNLQJRII
7KH0/ODWHUDOZLOONLFNRIIDW¶0'DQGGULOOWRDSODQQHG7'RI¶0'WDUJHWLQJWKH$VDQGWR
WKHQRUWK,WZLOOEHFRPSOHWHGZLWK´VORWWHGOLQHUIURP7'XSWRWRSRIZKLSVWRFN
37'$SSOLFDWLRQ0/0/0/ 0/
3DJHRI 'HFHPEHU
&7''ULOODQG&RPSOHWH0/DWHUDOV
3UH&7':RUNSRVWFXUUHQW5:2LQVWDOOLQJ7DQGHP:HGJH
6OLFNOLQH%UXVKDQGIOXVKQLSSOHSURILOHVGXPP\ZKLSVWRFNGULIWVHWORFNPDQGUHO FKHFNVHWIRU
LQQHUZHGJH
(/LQH/RJ*5 &&/VHWLQQHUZHGJH
3UHSVLWHIRU1DERUV&'5$&
5LJ:RUN
0,581DERUV&'5$&ULJXVLQJ´FRLOWXELQJ18´%23(WHVW
0//DWHUDO$VDQG6RXWKHDVW
D 0LOO´ZLQGRZDW¶0'
E 'ULOO´ELFHQWHUODWHUDOWR7'RI¶0'
F 5XQ´VORWWHGOLQHUZLWKDQDOXPLQXPELOOHWIURP7'XSWR¶0'
0//DWHUDO$VDQG6RXWKHDVW
D .LFNRIIRIWKHDOXPLQXPELOOHWDW¶0'
E 'ULOO´ELFHQWHUODWHUDOWR7'RI¶0'
F 5XQ´VORWWHGOLQHUZLWKDQDOXPLQXPELOOHWIURP7'XSWR¶0'
0//DWHUDO$VDQG1RUWK
D .LFNRIIRIWKHDOXPLQXPELOOHWDW¶0'
E 'ULOO´ELFHQWHUODWHUDOWR7'RI¶0'
F 5XQ´VORWWHGOLQHUZLWKDQDOXPLQXPELOOHWIURP7'XSWR¶0'
0//DWHUDO$VDQG1RUWK
D .LFNRIIRIWKHDOXPLQXPELOOHWDW¶0'
E 'ULOO´ELFHQWHUODWHUDOWR7'RI¶0'
F 5XQ´VORWWHGOLQHUZLWKGHSOR\PHQWVOHHYHIURP7'XSWR¶0'
2EWDLQ6%+3IUHH]HSURWHFW1'%23(DQG5'021DERUV&5'$&
3RVW5LJ:RUN
5HWXUQWRSURGXFWLRQ
3UHVVXUH'HSOR\PHQWRI%+$
7KHSODQQHGERWWRPKROHDVVHPEOLHV%+$VDUHWRRORQJWRVLPSO\LVRODWHE\FORVLQJWKHGRXEOHVZDEYDOYHVRQ
WKH&KULVWPDVWUHH03'RSHUDWLRQVUHTXLUHWKH%+$WREHOXEULFDWHGXQGHUSUHVVXUHXVLQJDV\VWHPRIGRXEOH
VZDEYDOYHVRQWKH&KULVWPDVWUHHGHSOR\PHQWUDPVWKHDQQXODUSUHYHQWHUZLOOVHUYHDVDVHFRQGDU\EDUULHU
GXULQJ%+$SUHVVXUHGHSOR\PHQWGRXEOHFKHFNYDOYHVDQGGRXEOHEDOOYDOYHVLQWKH%+$DQGDVOLFNOLQH
OXEULFDWRUFDQEHXVHG7KLVSUHVVXUHFRQWUROHTXLSPHQWOLVWHGHQVXUHVWKHUHDUHDOZD\VWZREDUULHUVWRUHVHUYRLU
SUHVVXUHERWKLQWHUQDODQGH[WHUQDOWRWKH%+$GXULQJWKHGHSOR\PHQWSURFHVV
'XULQJ%+$GHSOR\PHQWWKHIROORZLQJVWHSVDUHREVHUYHG
,QLWLDOO\WKHGRXEOHVZDEYDOYHVRQWKHWUHHDUHFORVHGWRLVRODWHUHVHUYRLUSUHVVXUH7KHOXEULFDWRULV
LQVWDOOHGRQWKH%23ULVHUZLWKWKH%+$LQVLGHWKHOXEULFDWRU
3UHVVXUHLVDSSOLHGWRWKHOXEULFDWRUWRHTXDOL]HDFURVVWKHVZDEYDOYHV7KHVZDEYDOYHVDUHRSHQHGDQG
WKH%+$LVORZHUHGLQSODFHYLDVOLFNOLQH
:KHQWKH%+$LVVSDFHGRXWSURSHUO\WKHGHSOR\PHQWUDPVDUHFORVHGRQWKH%+$WRLVRODWHUHVHUYRLU
SUHVVXUHYLDWKHDQQXOXVWKHDQQXODUSUHYHQWHUZLOOVHUYHDVDVHFRQGDU\EDUULHUGXULQJ%+$SUHVVXUH
GHSOR\PHQW$FORVHGVHWRIGRXEOHEDOOYDOYHVDQGGRXEOHFKHFNYDOYHVLVRODWHUHVHUYRLUSUHVVXUH
LQWHUQDOWRWKH%+$6OLSVRQWKHGHSOR\PHQWUDPVSUHYHQWWKH%+$IURPPRYLQJZKHQGLIIHUHQWLDO
SUHVVXUHLVDSSOLHG7KHOXEULFDWRULVUHPRYHGRQFHSUHVVXUHLVEOHGRIIDERYHWKHGHSOR\PHQWUDPV
37'$SSOLFDWLRQ0/0/0/ 0/
3DJHRI 'HFHPEHU
7KHFRLOHGWXELQJLVPDGHXSWRWKH%+$ZLWKWKHGRXEOHEDOOYDOYHVSOXVWKHGRXEOHFKHFNYDOYHVLQWKH
FORVHGSRVLWLRQ3UHVVXUHLVDSSOLHGWRWKHFRLOHGWXELQJWRHTXDOL]HLQWHUQDOSUHVVXUHDQGWKHQWKH
GRXEOHEDOOYDOYHVDUHRSHQHG7KHLQMHFWRUKHDGLVPDGHXSWRWKHULVHUDQQXODUSUHVVXUHLVHTXDOL]HG
DQGWKHGHSOR\PHQWUDPVDUHRSHQHG7KH%+$DQGFRLOHGWXELQJDUHQRZUHDG\WRUXQLQWKHKROH
'XULQJ%+$XQGHSOR\PHQWWKHVWHSVOLVWHGDERYHDUHREVHUYHGRQO\LQUHYHUVH
Liner Running
7KHODWHUDOZLOOEHGLVSODFHGWRDQRYHUEDODQFLQJIOXLGSULRUWRUXQQLQJOLQHU6HH³Drilling Fluids´VHFWLRQ
IRUPRUHGHWDLOV
:KLOHUXQQLQJ´VORWWHGOLQHUDMRLQWRI´QRQVORWWHGWXELQJZLOOEHVWDQGLQJE\IRU
HPHUJHQF\GHSOR\PHQW$IORRUYDOYHLVPDGHXSRQWRWKLVMRLQWDKHDGRIWLPHDQGWKHULJFUHZ
FRQGXFWVDGHSOR\PHQWGULOOZLWKWKLVHPHUJHQF\MRLQWRQHYHU\VORWWHGOLQHUUXQ7KH´UDPVZLOO
SURYLGHVHFRQGDU\ZHOOFRQWUROZKLOHUXQQLQJ´OLQHU
'LVSRVDORI'ULOOLQJ0XGDQG&XWWLQJV
Requirements of 20 AAC 25.005(c)(14
x 1RDQQXODULQMHFWLRQRQWKLVZHOO
x $OOVROLGZDVWHZLOOEHWUDQVSRUWHGWRWKHJULQGDQGLQMHFWIDFLOLW\DW'63UXGKRH%D\IRUGLVSRVDO
x ,QFLGHQWDOIOXLGVJHQHUDWHGIURPGULOOLQJRSHUDWLRQVZLOOEHLQMHFWHGLQD.XSDUXN&ODVV,,GLVSRVDOZHOO5
RU%GLVSRVDOIDFLOLWLHVRU3UXGKRH'6LID.XSDUXNIDFLOLW\LVXQDYDLODEOH
x $OOZDVWHVDQGZDVWHIOXLGVKDXOHGIURPWKHSDGPXVWEHSURSHUO\GRFXPHQWHGDQGPDQLIHVWHG
x &RQWDFW.XSDUXN(QYLURQPHQWDO&RRUGLQDWRUIRUTXHVWLRQVUHJDUGLQJZDVWHFODVVLILFDWLRQ
'LUHFWLRQDO3ODQVIRU,QWHQWLRQDOO\'HYLDWHG:HOOV
(Requirements of 20 AAC 25.050(b))
7KH$SSOLFDQWLVWKHRQO\DIIHFWHGRZQHU
3OHDVHVHH$WWDFKPHQW'LUHFWLRQDO3ODQV
0DJQHWLFDQGLQFOLQDWLRQVXUYH\VZLOOEHWDNHQHYHU\IW1RJ\URZLOOEHUXQ
0:'GLUHFWLRQDOUHVLVWLYLW\DQGJDPPDUD\ZLOOEHUXQRYHUWKHHQWLUHRSHQKROHVHFWLRQ
'LVWDQFHWR1HDUHVW3URSHUW\/LQHPHDVXUHGWR.3$ERXQGDU\DWFORVHVWSRLQW
/DWHUDO1DPH'LVWDQFH
0/¶
0/¶
0/¶
0/¶
'LVWDQFHWR1HDUHVW:HOOZLWKLQ3RRO
/DWHUDO1DPH'LVWDQFH:HOO
0/ ¶ ,/
0/¶ ,/
0/¶ 0
0/¶ 0
$WWDFKPHQWV
Attachment 1: Directional Plans for 3M-05L1, 3M-05L1-01, 3M-05L1-02 & 3M-05L1-03 laterals
Attachment 2: Current Well Schematic for 3M-05
Attachment 3: Proposed Well Schematic for 3M-05L1, 3M-05L1-01, 3M-05L1-02 & 3M-05L1-03 laterals
7UXH9HUWLFDO'HSWKXVIWLQ
9HUWLFDO6HFWLRQDWXVIWLQ0/70/70/70/ 70/70/700/ZS 7LH,Q3RLQW.237'6(&7,21 '(7$,/66HF0' ,QF $]L 79'VV16(: 'OHJ 7)DFH96HFW :(// '(7$,/6 016 (: 1RUWKLQJ (DVWLQJ /DWLWWXGH /RQJLWXGH
1
:3URMHFW .XSDUXN5LYHU8QLWB6LWH .XSDUXN03DG:HOO 0:HOOERUH 0/3ODQ 0/ZS:(//%25('(7$,/6 0/3DUHQW :HOOERUH 07LHRQ0' $]LPXWKVWR7UXH1RUWK0DJQHWLF1RUWK0DJQHWLF)LHOG6WUHQJWKQ7'LS$QJOH'DWH0RGHO %**0706RXWK1RUWKXVIWLQ
:HVW(DVWXVIWLQ0/70/70/ 70/70/70/7,/,/,/001/3%0/ZS7LH,Q3RLQW.237'5()(5(1&( ,1)250$7,21&RRUGLQDWH1(5HIHUHQFH :HOO07UXH1RUWK9HUWLFDO79'5HIHUHQFH 0HDQ6HD/HYHO6HFWLRQ965HIHUHQFH 6ORW1(0HDVXUHG'HSWK5HIHUHQFH 0#XVIW0&DOFXODWLRQ 0HWKRG 0LQLPXP&XUYDWXUH0/ZS0/ZS
Standard Planning Report
01 December, 2021
Plan: 3M-05L1 wp02
ConocoPhillips Alaska Inc_Kuparuk
Kuparuk River Unit_2
Kuparuk 3M Pad
3M-05
3M-05L1
Project:
Company:
Local Co-ordinate Reference:
TVD Reference:
Site:
ConocoPhillips Alaska Inc_Kuparuk
Kuparuk River Unit_2
Kuparuk 3M Pad
Baker Hughes
Planning Report
Well:
Wellbore:
3M-05
3M-05L1
Survey Calculation Method:Minimum Curvature
Mean Sea Level
Design:3M-05L1 wp02
Database:EDT 15 Alaska Prod
MD Reference:3M-05 @ 63.00usft (3M-05)
North Reference:
Well 3M-05
True
Map System:
Geo Datum:
Project
Map Zone:
System Datum:US State Plane 1983
North American Datum 1983
Kuparuk River Unit_2, North Slope Alaska, United States
Alaska Zone 4
Mean Sea Level
Using Well Reference Point
Using geodetic scale factor
Site Position:
From:
Site
Latitude:
Longitude:
Position Uncertainty:
Northing:
Easting:
Grid Convergence:
Kuparuk 3M Pad
usft
Map usft
usft
°0.04Slot Radius:in0.000
6,015,953.75
1,646,158.55
0.00
70° 27' 18.721 N
149° 57' 11.307 W
Well
Well Position
Longitude:
Latitude:
Easting:
Northing:
usft
+E/-W
+N/-S
Position Uncertainty
usft
usft
usftGround Level:
3M-05
usft
usft
0.00
0.00
6,016,045.86
1,646,196.63
0.00Wellhead Elevation:usft0.00
70° 27' 19.627 N
149° 57' 10.186 W
Wellbore
Declination
(°)
Field Strength
(nT)
Sample Date Dip Angle
(°)
3M-05L1
Model NameMagnetics
BGGM2021 1/1/2022 15.32 80.77 57,307.99
Phase:Version:
Audit Notes:
Design 3M-05L1 wp02
PLAN
Vertical Section: Depth From (TVD)
(usft)
+N/-S
(usft)
Direction
(°)
+E/-W
(usft)
Tie On Depth:8,600.00
135.000.000.00-26.80
Inclination
(°)
Azimuth
(°)
+E/-W
(usft)
TFO
(°)
+N/-S
(usft)
Measured
Depth
(usft)
TVD Below
System
(usft)
Dogleg
Rate
(°/100usft)
Build
Rate
(°/100usft)
Turn
Rate
(°/100usft)
Plan Sections
Target
0.000.000.000.005,570.14-610.976,060.9793.0648.208,600.00
-29.23-0.040.050.055,633.44-614.346,117.6093.0348.248,685.00
0.000.0030.0030.005,653.09-615.386,132.9893.0355.748,710.00
0.000.0045.0045.005,724.67-619.176,155.0793.0390.008,786.13
83.0044.874.4745.005,833.85-693.046,146.72155.3496.218,925.00
120.006.05-3.547.005,891.62-857.606,137.22165.9390.019,100.00
112.006.51-2.607.005,917.89-1,055.166,146.29178.9584.819,300.00
-80.00-6.891.297.005,959.70-1,300.156,162.01161.7188.049,550.00
-88.00-5.000.205.006,180.02-1,689.036,174.00139.2288.9510,000.00
-80.00-4.930.855.006,716.28-2,040.206,154.12107.1794.4610,650.00
95.004.99-0.495.007,029.27-2,192.186,131.91124.6292.7611,000.00
12/1/2021 10:19:23AM COMPASS 5000.15 Build 91E Page 2
Project:
Company:
Local Co-ordinate Reference:
TVD Reference:
Site:
ConocoPhillips Alaska Inc_Kuparuk
Kuparuk River Unit_2
Kuparuk 3M Pad
Baker Hughes
Planning Report
Well:
Wellbore:
3M-05
3M-05L1
Survey Calculation Method:Minimum Curvature
Mean Sea Level
Design:3M-05L1 wp02
Database:EDT 15 Alaska Prod
MD Reference:3M-05 @ 63.00usft (3M-05)
North Reference:
Well 3M-05
True
Measured
Depth
(usft)
Inclination
(°)
Azimuth
(°)
+E/-W
(usft)
Vertical
Section
(usft)
Dogleg
Rate
(°/100usft)
+N/-S
(usft)
Planned Survey
TVD Below
System
(usft)
Map
Northing
(usft)
Map
Easting
(usft)
Toolface
Azimuth
(°)
8,600.00 48.20 93.06 6,060.97 4,370.71 0.00-610.97 5,570.14 6,015,439.27 1,651,766.690.00
Tie-In-Point
8,685.00 48.24 93.03 6,117.60 4,417.85 0.05-614.34 5,633.44 6,015,435.95 1,651,829.98-29.23
KOP - Top of Whipstock
8,700.00 52.74 93.03 6,127.14 4,426.45 30.00-614.95 5,644.99 6,015,435.35 1,651,841.530.00
8,710.00 55.74 93.03 6,132.98 4,432.48 30.00-615.38 5,653.09 6,015,434.93 1,651,849.630.00
8,786.13 90.00 93.03 6,155.07 4,485.77 45.00-619.17 5,724.67 6,015,431.20 1,651,921.210.00
8,800.00 90.76 99.22 6,154.98 4,496.56 45.00-620.65 5,738.45 6,015,429.73 1,651,934.9983.00
8,900.00 95.45 144.06 6,149.27 4,591.19 45.00-671.61 5,821.32 6,015,378.84 1,652,017.8883.04
8,925.00 96.21 155.34 6,146.72 4,615.21 45.00-693.04 5,833.85 6,015,357.41 1,652,030.4385.60
9,000.00 93.56 159.90 6,140.34 4,684.16 7.00-762.12 5,862.28 6,015,288.36 1,652,058.91120.00
9,100.00 90.01 165.93 6,137.22 4,772.42 7.00-857.60 5,891.62 6,015,192.91 1,652,088.33120.39
9,200.00 87.39 172.43 6,139.49 4,855.08 7.00-955.74 5,910.38 6,015,094.80 1,652,107.16112.00
9,300.00 84.81 178.95 6,146.29 4,930.69 7.00-1,055.16 5,917.89 6,014,995.40 1,652,114.74111.85
9,400.00 86.06 172.04 6,154.26 5,006.45 7.00-1,154.47 5,925.72 6,014,896.10 1,652,122.65-80.00
9,500.00 87.37 165.15 6,160.00 5,089.56 7.00-1,252.28 5,945.45 6,014,798.32 1,652,142.46-79.45
9,550.00 88.04 161.71 6,162.01 5,133.49 7.00-1,300.15 5,959.70 6,014,750.46 1,652,156.74-79.05
9,600.00 88.12 159.21 6,163.68 5,178.60 5.00-1,347.24 5,976.41 6,014,703.39 1,652,173.48-88.00
9,700.00 88.31 154.21 6,166.79 5,271.43 5.00-1,439.02 6,015.91 6,014,611.65 1,652,213.05-87.92
9,800.00 88.51 149.22 6,169.56 5,367.14 5.00-1,527.02 6,063.26 6,014,523.70 1,652,260.47-87.76
9,900.00 88.73 144.22 6,171.97 5,465.00 5.00-1,610.57 6,118.11 6,014,440.20 1,652,315.37-87.62
10,000.00 88.95 139.22 6,174.00 5,564.26 5.00-1,689.03 6,180.02 6,014,361.80 1,652,377.34-87.50
10,100.00 89.82 134.30 6,175.07 5,664.17 5.00-1,761.85 6,248.50 6,014,289.03 1,652,445.87-80.00
10,200.00 90.69 129.38 6,174.62 5,763.99 5.00-1,828.53 6,322.98 6,014,222.42 1,652,520.39-79.95
10,300.00 91.56 124.45 6,172.65 5,862.94 5.00-1,888.56 6,402.89 6,014,162.46 1,652,600.35-79.97
10,400.00 92.42 119.52 6,169.18 5,960.29 5.00-1,941.49 6,487.63 6,014,109.60 1,652,685.12-80.07
10,500.00 93.25 114.59 6,164.23 6,055.27 5.00-1,986.90 6,576.55 6,014,064.26 1,652,774.06-80.24
10,600.00 94.07 109.64 6,157.84 6,147.19 5.00-2,024.46 6,668.98 6,014,026.78 1,652,866.51-80.48
10,650.00 94.46 107.17 6,154.12 6,191.77 5.00-2,040.20 6,716.28 6,014,011.08 1,652,913.82-80.80
10,700.00 94.24 109.66 6,150.33 6,236.35 5.00-2,055.95 6,763.58 6,013,995.37 1,652,961.1395.00
10,800.00 93.77 114.65 6,143.33 6,328.25 5.00-2,093.56 6,855.94 6,013,957.83 1,653,053.5195.19
10,900.00 93.28 119.64 6,137.18 6,423.23 5.00-2,139.09 6,944.73 6,013,912.37 1,653,142.3295.54
11,000.00 92.76 124.62 6,131.91 6,520.55 5.00-2,192.18 7,029.27 6,013,859.35 1,653,226.8995.85
TD
12/1/2021 10:19:23AM COMPASS 5000.15 Build 91E Page 3
Project:
Company:
Local Co-ordinate Reference:
TVD Reference:
Site:
ConocoPhillips Alaska Inc_Kuparuk
Kuparuk River Unit_2
Kuparuk 3M Pad
Baker Hughes
Planning Report
Well:
Wellbore:
3M-05
3M-05L1
Survey Calculation Method:Minimum Curvature
Mean Sea Level
Design:3M-05L1 wp02
Database:EDT 15 Alaska Prod
MD Reference:3M-05 @ 63.00usft (3M-05)
North Reference:
Well 3M-05
True
Target Name
- hit/miss target
- Shape
TVD
(usft)
Northing
(usft)
Easting
(usft)
+N/-S
(usft)
+E/-W
(usft)
Targets
LongitudeLatitude
Dip Angle
(°)
Dip Dir.
(°)
3M-05L1 Polygon 0.00 6,015,517.00 1,652,121.00-533.51 5,924.55 0.00 0.00 70° 27' 14.357 N 149° 54' 16.154 W
- plan misses target center by 6071.81usft at 8600.00usft MD (6060.97 TVD, -610.97 N, 5570.14 E)
- Polygon
0.00Point 1 6,015,517.00 1,652,121.000.00 0.00
-584.18Point 2 6,014,933.00 1,652,283.000.00 161.56
-922.33Point 3 6,014,595.00 1,652,429.000.00 307.32
-1,099.45Point 4 6,014,418.00 1,652,564.000.00 442.19
-1,240.62Point 5 6,014,277.00 1,652,757.000.00 635.10
-1,407.93Point 6 6,014,110.00 1,653,142.000.00 1,020.01
-1,595.16Point 7 6,013,923.00 1,653,408.000.00 1,285.89
-1,861.02Point 8 6,013,657.00 1,653,200.000.00 1,077.66
-1,693.83Point 9 6,013,824.00 1,652,970.000.00 847.77
-1,547.50Point 10 6,013,970.00 1,652,569.000.00 446.84
-1,354.27Point 11 6,014,163.00 1,652,299.000.00 176.97
-1,125.12Point 12 6,014,392.00 1,652,132.000.00 10.13
-692.95Point 13 6,014,824.00 1,651,965.000.00 -156.55
-176.79Point 14 6,015,340.00 1,651,830.000.00 -291.17
3M-05L1 T2 6,135.00 6,015,224.00 1,652,056.00-826.49 5,859.32 0.00 0.00 70° 27' 11.476 N 149° 54' 18.077 W
- plan misses target center by 23.15usft at 9060.83usft MD (6137.70 TVD, -819.82 N, 5881.32 E)
- Point
3M-05L1 T2.5 6,153.00 6,014,013.00 1,652,913.00-2,038.28 6,715.46 0.00 0.00 70° 26' 59.551 N 149° 53' 52.961 W
- plan misses target center by 2.01usft at 10648.70usft MD (6154.22 TVD, -2039.82 N, 6715.05 E)
- Point
3M-05L1 T3 6,159.00 6,014,694.00 1,652,033.00-1,356.52 5,835.90 0.00 0.00 70° 27' 6.263 N 149° 54' 18.777 W
- plan misses target center by 135.37usft at 9561.62usft MD (6162.40 TVD, -1311.16 N, 5963.40 E)
- Point
3M-05L1 T1 6,145.00 6,015,408.00 1,651,881.00-642.34 5,684.44 0.00 0.00 70° 27' 13.288 N 149° 54' 23.210 W
- plan misses target center by 25.54usft at 8745.34usft MD (6148.60 TVD, -617.05 N, 5684.63 E)
- Point
3M-05L1 T2.4 6,175.00 6,014,319.00 1,652,416.00-1,731.86 6,218.65 0.00 0.00 70° 27' 2.569 N 149° 54' 7.544 W
- plan misses target center by 0.25usft at 10057.69usft MD (6174.80 TVD, -1731.76 N, 6218.76 E)
- Point
3M-05L1 T2.6 6,132.00 6,013,890.00 1,653,267.00-2,161.56 7,069.40 0.00 0.00 70° 26' 58.335 N 149° 53' 42.570 W
- plan misses target center by 50.48usft at 11000.00usft MD (6131.91 TVD, -2192.18 N, 7029.27 E)
- Point
Vertical
Depth
(usft)
Measured
Depth
(usft)
Casing
Diameter
(in)
Hole
Diameter
(in)Name
Casing Points
2 3/8"6,131.9111,000.00 2.375 3.500
Measured
Depth
(usft)
Vertical
Depth
(usft)
+E/-W
(usft)
+N/-S
(usft)
Local Coordinates
Comment
Plan Annotations
8,600.00 6,060.97 -610.97 5,570.14 Tie-In-Point
8,685.00 6,117.60 -614.34 5,633.44 KOP - Top of Whipstock
11,000.00 6,131.91 -2,192.18 7,029.27 TD
12/1/2021 10:19:23AM COMPASS 5000.15 Build 91E Page 4
Baker Hughes
Anticollision Summary Report
Well 3M-05Local Co-ordinate Reference:ConocoPhillips Alaska Inc_KuparukCompany:
Mean Sea LevelTVD Reference:Kuparuk River Unit_2Project:
3M-05 @ 63.00usft (3M-05)MD Reference:Kuparuk 3M PadReference Site:
TrueNorth Reference:0.00 usftSite Error:
Minimum CurvatureSurvey Calculation Method:3M-05Reference Well:
Output errors are at 2.00 sigmaWell Error:0.00 usft
Reference Wellbore 3M-05L1 Database:EDT 15 Alaska Prod
Offset DatumReference Design:3M-05L1 wp02 Offset TVD Reference:
Interpolation Method:
Depth Range:
Reference
Error Model:
Scan Method:
Error Surface:
Filter type:
ISCWSA
Trav. Cylinder North
Combined Pedal Curve
GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
MD Interval 25.00usft
8,600.00 to 11,000.00usft
Maximum ellipse separation of 3,000.00usft
3M-05L1 wp02
Results Limited by:
SigmaWarning Levels Evaluated at: 2.79 Added to Error ValuesCasing Method:
From
(usft)
Survey Tool Program
DescriptionTool NameSurvey (Wellbore)
To
(usft)
Date 12/1/2021
GCT-MS Schlumberger GCT multishot100.00 8,600.00 3M-05 (3M-05)
MWD OWSG OWSG MWD - Standard8,600.00 11,000.00 3M-05L1 wp02 (3M-05L1)
Offset Well - Wellbore - Design
Reference
Measured
Depth
(usft)
Offset
Measured
Depth
(usft)
Between
Centres
(usft)
Between
Ellipses
(usft)
Separation
Factor
Warning
Summary
Site Name
Distance
Kuparuk 3I Pad
Normal Operations, CC, ES, 3I-01 - 3I-01L1-03 - 3I-01L1-03 10,626.88 12,090.00 477.38 263.57 2.233
Normal Operations, CC, ES, 3I-01 - 3I-01L1-04 - 3I-01L1-04 10,500.00 12,133.00 484.56 270.81 2.267
Normal Operations, CC, ES, 3I-01 - 3I-01L1-05 - 3I-01L1-05 10,817.78 12,066.00 490.93 270.12 2.223
Kuparuk 3M Pad
CC, ES, SF3M-02 - 3M-02 - 3M-02 9,800.00 8,486.00 2,397.16 2,212.49 12.981
Normal Operations, CC, ES3M-04 - 3M-04 - 3M-04 10,500.00 9,650.00 705.76 460.87 2.882
Normal Operations, SF3M-04 - 3M-04 - 3M-04 10,530.57 9,725.00 707.49 461.85 2.880
CC, ES, SF3M-05 - 3M-05 - 3M-05 8,900.00 9,075.00 253.61 249.30 58.871
CC, ES3M-13 - 3M-13 - 3M-13 8,600.00 8,850.00 2,808.71 2,535.56 10.283
SF3M-13 - 3M-13 - 3M-13 8,790.00 8,900.00 2,823.06 2,545.02 10.154
Kuparuk 3N Pad
CC, ES, SF3N-05 - 3N-05L1 - 3N-05L1 11,000.00 9,775.00 1,725.75 1,490.43 7.334
CC, ES, SF3N-05 - 3N-05L1PB1 - 3N-05L1PB1 11,000.00 9,700.00 1,608.12 1,364.87 6.611
12/1/2021 9:56:24AM COMPASS 5000.15 Build 91E
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
Page 2
3URMHFW .XSDUXN5LYHU8QLWB6LWH .XSDUXN03DG:HOO 0:HOOERUH 0/3ODQ 0/ZS:(//%25('(7$,/6 0/3DUHQW :HOOERUH 07LHRQ0' $]LPXWKVWR7UXH1RUWK0DJQHWLF1RUWK0DJQHWLF)LHOG6WUHQJWKQ7'LS$QJOH'DWH0RGHO %**0706RXWK1RUWKXVIWLQ
:HVW(DVWXVIWLQ6RXWK1RUWKXVIWLQ
:HVW(DVWXVIWLQ0/3RO\JRQ0/3RO\JRQ0/3RO\JRQ0/3RO\JRQ0000/ZS0/ZS0/ZS
0
0
0 ,/,/,/11 1/1/1/3%11$/1$/1$/1$/111$
1 $/1$/1$/1$/0/ZS5()(5(1&( ,1)250$7,21&RRUGLQDWH1(5HIHUHQFH :HOO07UXH1RUWK9HUWLFDO79'5HIHUHQFH 0HDQ6HD/HYHO6HFWLRQ965HIHUHQFH 6ORW1(0HDVXUHG'HSWK5HIHUHQFH 0#XVIW0&DOFXODWLRQ0HWKRG 0LQLPXP&XUYDWXUH0/ZS0/ZS0/ZS0/ ZS
/DVW7DJ
$QQRWDWLRQ 'HSWKIW.% (QG'DWH :HOOERUH /DVW0RG%\
/DVW7DJ5.%(VW
RI5DWKROH 0 ]HPEDHM
/DVW5HY5HDVRQ
$QQRWDWLRQ (QG'DWH :HOOERUH /DVW0RG%\
5HY5HDVRQ6HWKROGRSHQVOHHYHLQWKH6669 0 IHUJXVS
&DVLQJ6WULQJV
&DVLQJ'HVFULSWLRQ
&21'8&725
2'LQ
,'LQ
7RSIW.%
6HW'HSWKIW.%
6HW'HSWK79'«
:W/HQO«
*UDGH
+
7RS7KUHDG
:(/'('
&DVLQJ'HVFULSWLRQ
685)$&(
2'LQ
,'LQ
7RSIW.%
6HW'HSWKIW.%
6HW'HSWK79'«
:W/HQO«
*UDGH
-
7RS7KUHDG
%7&
&DVLQJ'HVFULSWLRQ
352'8&7,21
2'LQ
,'LQ
7RSIW.%
6HW'HSWKIW.%
6HW'HSWK79'«
:W/HQO«
*UDGH
-
7RS7KUHDG
%7&
7XELQJ6WULQJV
7XELQJ'HVFULSWLRQ
78%,1*
6WULQJ0D«
,'LQ
7RSIW.%
6HW'HSWKIW«
6HW'HSWK79'«
:WOEIW
*UDGH
/
7RS&RQQHFWLRQ
$%0(8(
&RPSOHWLRQ'HWDLOV
7RSIW.% 7RS79'IW.% 7RS,QFO ,WHP'HV
1RPLQDO,'
LQ 0DNH 0RGHO
2'1RPLQDO
LQ
+$1*(5 9(7&2
*5$<
6$)(7<9/9 2WLV )0;
3%5 &DPFR 2(-
3$&.(5 &DPFR +5363
1,33/( &DPFR '
626 %DNHU
2WKHU,Q+ROH:LUHOLQHUHWULHYDEOHSOXJVYDOYHVSXPSVILVKHWF
7RS
IW.%
7RS
79'
IW.%
7RS,QFO
'HV &RP 5XQ'DWH ,'LQ 61
,626/((9( 6HWKROGRSHQVOHHYHLQ6669[
,'2$/
&87 &KHP&XW
&$7&+(5 &DWFKHU2$/6HWRQ3OXJ
78%,1*3/8* &$3OXJ2$/
),6+ */9(PSW\3RFNHW)HOOGRZQKROH
),6+ 29(PSW\3RFNHW)HOOWR5DWKROH
0DQGUHOV
7RSIW.%
7RS79'
IW.% 7RS,QFO ,WHP'HV 1RPLQDO,'LQ 0DNH 0RGHO
2'1RPLQDO
LQ
*$6/,)7 00+ )0+2
*$6/,)7 00+ )0+2
*$6/,)7 00+ )0+2
*$6/,)7 00+ )0+2
*$6/,)7 00+ )0+2
*$6/,)7 00+ )0+2
0DQGUHO,QVHUWV
6W
DWL
RQ
1
R7RSIW.%
7RS79'
IW.%
7RS
,QFO 0DNH 0RGHO 2'LQ 6HUY
9DOYH
7\SH
/DWFK
7\SH
3RUW6L]H
LQ
7525XQ
SVL 5XQ'DWH &RP
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %70
*$6/,)7 '0< %.
*$6/,)7 23(1 23(1
3HUIRUDWLRQV 6ORWV
7RSIW.% %WPIW.%
7RS79'
IW.%
%WP79'
IW.% /LQNHG=RQH 'DWH
6KRW
'HQV
VKRWVIW
7\SH &RP
$0 53(5) '\QD6WULSGHJSK
$0 ,3(5) &VJ*XQGHJSK
$$0 ,3(5) '\QD6WULSGHJSK
$0 ,3(5) &VJ*XQGHJSK
$0 ,3(5) &VJ*XQGHJSK
$0 ,3(5) &VJ*XQGHJSK
1RWHV*HQHUDO 6DIHW\
(QG'DWH $QQRWDWLRQ
127(,$[2$&20081,&$7,21
030
9HUWLFDOVFKHPDWLFDFWXDO
352'8&7,21
),6+
),6+
,3(5)
,3(5)
,3(5)
,3(5)
,3(5)
53(5)
626
78%,1*3/8*
1,33/(
&$7&+(5
3$&.(5
3%5
&87
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
685)$&(
*$6/,)7
,626/((9(
6$)(7<9/9
&21'8&725
+$1*(5
.83352'
.%*UGIW
5LJ5HOHDVH'DWH
0
7'
$FW%WPIW.%
:HOO$WWULEXWHV
)LHOG1DPH
.83$58.5,9(581,7
:HOOERUH$3,8:,
:HOOERUH6WDWXV
352'
0D[$QJOH 0'
,QFO
0'IW.%
:(//1$0( :(//%25(0
$QQRWDWLRQ
/DVW:2
(QG'DWH
+6SSP
'DWH
&RPPHQW
666975'3
03URSRVHG&7'6FKHPDWLF-VKRH#
0'-VKRH#
0'+VKRH#
0'$VDQGSHUIV
0'
0'SURSRVHG72:6GHSWK1LSSOHPLQ,'/(8(UG7XELQJWRVXUIDFH&DPFRJDVOLIWPDQGUHOV#7%'%DNHU)+/SDFNHU#
0'[7DQGHP:HGJH$VVHPEO\ )LQDOGHSWKVWREHFDSWXUHGSRVW5:20/ZS7'a
0'7RSRI%LOOHWa
0'0/ZS7'a
0'7RSRI%LOOHWa
0'0/ZS7'a
0'7RSRI%LOOHWa
0'0/ZS7'a
0'7RSRI/LQHUa
0'1RUWKHUQ6ROXWLRQV:HGJH
/%DVH3LSH
2'
ORQJ
a
7RWDO/HQJWK
%RUHWKUX8SSHU7UD\
%RUHWKUX/RZHU6HFWLRQ
+(6;1LSSOHEHORZ
5HYLVHG
75$160,77$//(77(5&+(&./,67
:(//1$0(BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
37'BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
BBB'HYHORSPHQWBBB6HUYLFHBBB([SORUDWRU\BBB6WUDWLJUDSKLF7HVWBBB1RQ&RQYHQWLRQDO
),(/'BBBBBBBBBBBBBBBBBBBBBBBBBBBB322/BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
&KHFN%R[IRU$SSURSULDWH/HWWHU3DUDJUDSKVWREH,QFOXGHGLQ7UDQVPLWWDO/HWWHU
&+(&. 237,216 7(;7)25$33529$//(77(5
08/7,
/$7(5$/
,IODVWWZRGLJLWV
LQ$3,QXPEHUDUH
EHWZHHQ
7KH SHUPLW LV IRU D QHZ ZHOOERUH VHJPHQW RI H[LVWLQJ ZHOO 3HUPLW
1R BBBBBBBBBBBBB $3, 1R BBBBBBBBBBBBBBBBBBBBBBB
3URGXFWLRQVKRXOGFRQWLQXHWREHUHSRUWHGDVDIXQFWLRQRIWKHRULJLQDO
$3,QXPEHUVWDWHGDERYH
3LORW+ROH
,QDFFRUGDQFH ZLWK $$& I DOO UHFRUGV GDWD DQG ORJV
DFTXLUHG IRU WKH SLORW KROH PXVW EH FOHDUO\ GLIIHUHQWLDWHG LQ ERWK
ZHOO QDPH BBBBBBBBBBBBBBBBBBBBBBB3+ DQG $3, QXPEHU
BBBBBBBBBBBBBBBBBBBBBIURPUHFRUGVGDWDDQGORJVDFTXLUHGIRU
ZHOOQDPHRQSHUPLW
6SDFLQJ
([FHSWLRQ
7KHSHUPLWLVDSSURYHGVXEMHFWWRIXOOFRPSOLDQFHZLWK$$&
$SSURYDO WR SURGXFHLQMHFW LV FRQWLQJHQW XSRQ LVVXDQFH RI
D FRQVHUYDWLRQ RUGHU DSSURYLQJ D VSDFLQJ H[FHSWLRQ
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBDV2SHUDWRUDVVXPHVWKHOLDELOLW\
RIDQ\SURWHVWWRWKHVSDFLQJH[FHSWLRQWKDWPD\RFFXU
'U\'LWFK6DPSOH
$OOGU\GLWFKVDPSOHVHWVVXEPLWWHGWRWKH$2*&&PXVWEHLQQRJUHDWHU
WKDQ
VDPSOHLQWHUYDOVIURPEHORZWKHSHUPDIURVWRUIURPZKHUH
VDPSOHVDUHILUVWFDXJKWDQG
VDPSOHLQWHUYDOVWKURXJKWDUJHW]RQHV
1RQ
&RQYHQWLRQDO
:HOO
3OHDVHQRWHWKHIROORZLQJVSHFLDOFRQGLWLRQRIWKLVSHUPLW
3URGXFWLRQRUSURGXFWLRQWHVWLQJRIFRDOEHGPHWKDQHLVQRWDOORZHGIRU
ZHOO XQWLODIWHU
KDVGHVLJQHGDQGLPSOHPHQWHGDZDWHUZHOOWHVWLQJSURJUDPWRSURYLGH
EDVHOLQH GDWD RQ ZDWHU TXDOLW\ DQG TXDQWLW\
BBBBBBBBBBBBBBBBBBBBBBBB PXVW FRQWDFW WKH $2*&& WR REWDLQ
DGYDQFHDSSURYDORIVXFKZDWHUZHOOWHVWLQJSURJUDP
:HOO/RJJLQJ
5HTXLUHPHQWV
5HJXODWLRQ$$&DDXWKRUL]HVWKH$2*&&WRVSHFLI\W\SHV
RIZHOOORJVWREHUXQ,QDGGLWLRQWRWKHZHOOORJJLQJSURJUDPSURSRVHG
E\BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBLQWKHDWWDFKHGDSSOLFDWLRQ
WKHIROORZLQJZHOOORJVDUHDOVRUHTXLUHGIRUWKLVZHOO
3HU6WDWXWH$6G%DQG5HJXODWLRQ$$&
FRPSRVLWHFXUYHVIRUZHOOORJVUXQPXVWEHVXEPLWWHGWRWKH$2*&&
ZLWKLQGD\VDIWHUFRPSOHWLRQVXVSHQVLRQRUDEDQGRQPHQWRIWKLV
ZHOO
.58 0/
;
;
.XSDUXN 5LYHU 2LO
;
.XSDUXN 5LYHU
;
WELL PERMIT CHECKLISTCompanyConocoPhillips Alaska, Inc.Well Name:KUPARUK RIV UNIT 3M-05L1Initial Class/TypeDEV / PENDGeoArea890Unit11160On/Off ShoreOnProgramDEVField & PoolWell bore segAnnular DisposalPTD#:2211070KUPARUK RIVER, KUPARUK RIV OIL - 490100NA1Permit fee attachedYes2Lease number appropriateYes3Unique well name and numberYes4Well located in a defined poolYes5Well located proper distance from drilling unit boundaryYes6Well located proper distance from other wellsYes7Sufficient acreage available in drilling unitYesDirectional plan view included , no land plat in package.8If deviated, is wellbore plat includedYes9Operator only affected partyYes10Operator has appropriate bond in forceYes11Permit can be issued without conservation orderYes12Permit can be issued without administrative approvalYes13Can permit be approved before 15-day waitNA14Well located within area and strata authorized by Injection Order # (put IO# in comments) (For NA15All wells within 1/4 mile area of review identified (For service well only)NA16Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA17Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)NA18Conductor string providedNA19Surface casing protects all known USDWsNA20CMT vol adequate to circulate on conductor & surf csgNA21CMT vol adequate to tie-in long string to surf csgNo22CMT will cover all known productive horizonsYes23Casing designs adequate for C, T, B & permafrostYes24Adequate tankage or reserve pitNA25If a re-drill, has a 10-403 for abandonment been approvedYes26Adequate wellbore separation proposedNA27If diverter required, does it meet regulationsYesMax formation pressure is 5097 psig(15.74 ppg EMW); will drill w/ 8.6 ppg EMW and maintain overbal w/ MPD28Drilling fluid program schematic & equip list adequateYes29BOPEs, do they meet regulationYesMPSP is 4479 psig; will test BOPs to 5000 psig30BOPE press rating appropriate; test to (put psig in comments)Yes31Choke manifold complies w/API RP-53 (May 84)Yes32Work will occur without operation shutdownYes33Is presence of H2S gas probableNA34Mechanical condition of wells within AOR verified (For service well only)No3M-Pad wells are H2S-bearing. H2S measures are required.35Permit can be issued w/o hydrogen sulfide measuresYes36Data presented on potential overpressure zonesNA37Seismic analysis of shallow gas zonesNA38Seabed condition survey (if off-shore)NA39Contact name/phone for weekly progress reports [exploratory only]ApprDLBDate12/9/2021ApprVTLDate12/20/2021ApprDLBDate12/9/2021AdministrationEngineeringGeologyGeologic Commissioner:Date:Engineering Commissioner:DatePublic CommissionerDate-03