Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout221-108DATA SUBMITTAL COMPLIANCE REPORT API No.50-029-21706-61-00Well Name/No.KUPARUK RIV UNIT 3M-05L1-01 Completion Status 1-OILCompletion Date 2/6/2022 Permit to Drill 2211080 Operator ConocoPhillips Alaska, Inc. MD 10987 TVD 6175 Current Status 1-OIL 8/17/2023 UIC No Well Log Information: Digital Med/Frmt ReceivedStart Stop OH / CH Comments Log Media Run No Electr Dataset Number Name Interval List of Logs Obtained:GR/RES NoNo YesMud Log Samples Directional Survey REQUIRED INFORMATION (from Master Well Data/Logs) DATA INFORMATION Log/ Data Type Log Scale DF 3/4/20228452 10987 Electronic Data Set, Filename: 3M-05L1-01 GAMMA RES.las 36399ED Digital Data DF 3/4/2022################Electronic Data Set, Filename: wellname_PWD Digital Data_Run xx.las 36399ED Digital Data DF 3/4/2022 Electronic File: 3M-05L1-01 2MD Final Log.cgm36399EDDigital Data DF 3/4/2022 Electronic File: 3M-05L1-01 5MD FInal Log.cgm36399EDDigital Data DF 3/4/2022 Electronic File: 3M-05L1-01 5TVDSS Final Log.cgm 36399ED Digital Data DF 3/4/2022 Electronic File: 3M-05L1-01 Run 17 PWD Log.cgm 36399ED Digital Data DF 3/4/2022 Electronic File: 3M-05L1-01 Run 18 PWD Log.cgm 36399ED Digital Data DF 3/4/2022 Electronic File: 3M-05L1-01 Run 19 PWD Log.cgm 36399ED Digital Data DF 3/4/2022 Electronic File: 3M-05L1-01 Run 20 PWD Log.cgm 36399ED Digital Data DF 3/4/2022 Electronic File: 3M-05L1-01 GAMMA RES.ASC36399EDDigital Data DF 3/4/2022 Electronic File: 3M-05L1-01_PWD Log Run 17.ASC 36399ED Digital Data DF 3/4/2022 Electronic File: 3M-05L1-01_PWD Log Run 18.ASC 36399ED Digital Data DF 3/4/2022 Electronic File: 3M-05L1-01_PWD Log Run 19.ASC 36399ED Digital Data DF 3/4/2022 Electronic File: 3M-05L1-01_PWD Log Run 20.ASC 36399ED Digital Data Thursday, August 17, 2023AOGCC Page 1 of 3 05L1-01 GAMMA RES.las 3M--0 DATA SUBMITTAL COMPLIANCE REPORT API No.50-029-21706-61-00Well Name/No.KUPARUK RIV UNIT 3M-05L1-01 Completion Status 1-OILCompletion Date 2/6/2022 Permit to Drill 2211080 Operator ConocoPhillips Alaska, Inc. MD 10987 TVD 6175 Current Status 1-OIL 8/17/2023 UIC No Well Cores/Samples Information: ReceivedStart Stop Comments Total Boxes Sample Set NumberName Interval INFORMATION RECEIVED DF 3/4/2022 Electronic File: wellname_PWD Digital Data_Run xx.ASC 36399ED Digital Data DF 3/4/2022 Electronic File: 3M-05L1-01 2MD Final Log.pdf36399EDDigital Data DF 3/4/2022 Electronic File: 3M-05L1-01 5MD FInal Log.pdf36399EDDigital Data DF 3/4/2022 Electronic File: 3M-05L1-01 5TVDSS Final Log.pdf 36399ED Digital Data DF 3/4/2022 Electronic File: 3M-05L1-01 Run 17 PWD Log.PDF 36399ED Digital Data DF 3/4/2022 Electronic File: 3M-05L1-01 Run 18 PWD Log.pdf36399EDDigital Data DF 3/4/2022 Electronic File: 3M-05L1-01 Run 19 PWD Log.PDF 36399ED Digital Data DF 3/4/2022 Electronic File: 3M-05L1-01 Run 20 PWD Log.pdf36399EDDigital Data DF 3/4/2022 Electronic File: 3M-05L1-01 NAD27 Definitive Survey Report.pdf 36399ED Digital Data DF 3/4/2022 Electronic File: 3M-05L1-01 NAD27.txt36399EDDigital Data DF 3/4/2022 Electronic File: 3M-05L1-01 NAD83 Definitive Survey Report.pdf 36399ED Digital Data DF 3/4/2022 Electronic File: 3M-05L1-01 NAD83.txt36399EDDigital Data DF 3/4/2022 Electronic File: 3M-05L1-01 2MD Final Log.tif36399EDDigital Data DF 3/4/2022 Electronic File: 3M-05L1-01 5MD FInal Log.tif36399EDDigital Data DF 3/4/2022 Electronic File: 3M-05L1-01 5TVDSS Final Log.tif36399EDDigital Data DF 3/4/2022 Electronic File: 3M-05L1-01 Run 17 PWD Log.tif36399EDDigital Data DF 3/4/2022 Electronic File: 3M-05L1-01 Run 18 PWD Log.tif36399EDDigital Data DF 3/4/2022 Electronic File: 3M-05L1-01 Run 19 PWD Log.tif36399EDDigital Data DF 3/4/2022 Electronic File: 3M-05L1-01 Run 20 PWD Log.tif36399EDDigital Data DF 3/4/2022 Electronic File: wellname Run xx PWD Log.tif36399EDDigital Data Thursday, August 17, 2023AOGCC Page 2 of 3 DATA SUBMITTAL COMPLIANCE REPORT API No.50-029-21706-61-00Well Name/No.KUPARUK RIV UNIT 3M-05L1-01 Completion Status 1-OILCompletion Date 2/6/2022 Permit to Drill 2211080 Operator ConocoPhillips Alaska, Inc. MD 10987 TVD 6175 Current Status 1-OIL 8/17/2023 UIC No Completion Report Production Test Information Geologic Markers/Tops Y Y / NA Y Comments: Compliance Reviewed By:Date: Mud Logs, Image Files, Digital Data Composite Logs, Image, Data Files Cuttings Samples Y / NA Y Y / NA Directional / Inclination Data Mechanical Integrity Test Information Daily Operations Summary Y Y / NA Y Core Chips Core Photographs Laboratory Analyses Y / NA Y / NA Y / NA COMPLIANCE HISTORY Date CommentsDescription Completion Date:2/6/2022 Release Date:12/20/2021 Thursday, August 17, 2023AOGCC Page 3 of 3 M. Guhl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y Meredith Guhl at 11:05 am, Mar 16, 2022 Completion Date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igitally signed by Jeff ConnellyDN: C=US, OU=CTD, O=ConocoPhillips, CN=Jeff Connelly, E=jeff.s.connelly@conocophillips.comReason: I am the author of this documentLocation: your signing location here Date: 2022.03.16 09:52:51-08'00'Foxit PDF Editor Version: 11.0.0Jeff Connelly 3M - 0 5 F i n a l C T D S c h e m a t i c 9- 5 / 8 " 3 6 # J - 5 5 s h o e @ 4 3 5 1 ' M D 7" 2 6 # J - 5 5 s h o e @ 8 9 4 8 ' M D 16 " 6 2 . 5 # H - 4 0 sh o e @ 1 1 5 ' M D A- s a n d p e r f s 86 6 6 ' - 8 7 3 9 ' M D 86 8 5 ' M D T O W S (F a i l e d W i n d o w ) 3- 1 / 2 " N i p p l e ( 2 . 8 1 3 " m i n I D ) @ 4 7 4 ' M D 3- 1 / 2 " 9 . 3 # L - 8 0 E U E 8 r d T u b i n g t o s u r f a c e 3- 1 / 2 " C a m c o g a s l i f t m a n d r e l s @ 29 4 2 ' M D 48 8 8 ' M D 61 9 1 ' M D 71 7 6 ' M D 78 8 8 ' M D 84 3 7 ' M D Bl u e P a c k M a x R H p a c k e r @ 8 5 0 4 ' M D 3- 1 / 2 " N i p p l e ( 2 . 8 1 3 " m i n I D ) @ 8 6 1 6 ' M D 3- 1 / 2 " N i p p l e ( 2 . 8 1 3 " m i n I D ) @ 8 6 7 7 ' M D 3- 1 / 2 " N i p p l e ( 2 . 8 1 3 " m i n I D ) @ 8 6 9 7 ' M D 3M - 0 5 L 1 TD = 1 0 , 9 7 7 ' M D To p o f B i l l e t = 9 3 0 6 ' M D 3M - 0 5 L 1 - 0 1 TD = 1 0 , 9 8 7 ' M D To p o f B i l l e t = 8 7 3 5 ' M D 3M - 0 5 L 1 - 0 2 TD = 1 1 , 7 1 8 ' M D To p o f B i l l e t = 9 5 9 7 ' M D 3M - 0 5 L 1 - 0 3 TD = 1 1 , 7 1 7 ' M D Li n e r t o p p a c k e r = 8 6 3 7 ' M D Sl o t t e d l i n e r f r o m T D u p t o 8 7 2 3 ' M D ( s w e l l pa c k e r ) Bl a n k L i n e r f r o m 8 7 1 0 ' u p t o 8 6 3 7 ' M D ( l i n e r to p p a c k e r ) No r t h e r n S o l u t i o n s W e d g e * 3 - 1 / 2 " 9 . 3 # L - 8 0 B a s e P i p e * 6 " O D ( 2 0 ' l o n g ) * ~ 4 0 ' T o t a l L e n g t h * 0 . 6 2 5 " B o r e t h r u U p p e r T r a y * 1 . 1 2 5 " B o r e t h r u L o w e r S e c t i o n * H E S 2 . 8 1 " X N i p p l e b e l o w 86 6 5 ' M D T O W S (F a i l e d W i n d o w ) 86 4 6 ' M D TO W S d e p t h 3M - 0 5 L 1 P B 1 PB T D = 1 0 , 4 0 0 ' M D An c h o r e d B i l l e t = 8 9 5 0 ' M D Last Tag Annotation Depth (ftKB) End Date Wellbore Last Mod By Last Tag: RKB (Est. 3' of Rathole) 8,742.0 11/14/2019 3M-05 zembaej Last Rev Reason Annotation End Date Wellbore Last Mod By Rev Reason: Set LTP 2/17/2022 3M-05 fergusp Casing Strings Casing Description CONDUCTOR OD (in) 16 ID (in) 15.06 Top (ftKB) 38.0 Set Depth (ftKB) 115.0 Set Depth (TVD) … 115.0 Wt/Len (l… 62.50 Grade H-40 Top Thread WELDED Casing Description SURFACE OD (in) 9 5/8 ID (in) 8.92 Top (ftKB) 37.0 Set Depth (ftKB) 4,351.4 Set Depth (TVD) … 3,419.3 Wt/Len (l… 36.00 Grade J-55 Top Thread BTC Casing Description 7" Tie-Back Patch OD (in) 7 ID (in) 6.28 Top (ftKB) 42.2 Set Depth (ftKB) 2,725.0 Set Depth (TVD) … 2,333.8 Wt/Len (l… 26.00 Grade L-80 Top Thread Hyd 563 Casing Description PRODUCTION ORIGINAL OD (in) 7 ID (in) 6.28 Top (ftKB) 2,725.0 Set Depth (ftKB) 8,948.2 Set Depth (TVD) … 6,355.9 Wt/Len (l… 26.00 Grade J-55 Top Thread BTC Casing Description L1-03 Liner OD (in) 2 3/8 ID (in) 1.99 Top (ftKB) 8,637.3 Set Depth (ftKB) 11,717.0 Set Depth (TVD) … Wt/Len (l… 4.60 Grade L-80 Top Thread STL Liner Details Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com Nominal ID (in) 8,637.3 6,148.8 48.22 SBR (Seal Bore Receptacle) NSAK 225 Sealbore Deployment Sleeve (PBR) 2.250 8,710.6 6,197.7 48.25 Swell Packer Swell Packer - Reactive 1.686 9,576.6 Deployment Sleeve NSAK 350-238 OH Permanent QCLL 1.920 10,831.5 Deployment Sleeve NSAK 350-238 OH Permanent QCLL 1.920 Casing Description L1-01 Liner OD (in) 2 3/8 ID (in) 1.99 Top (ftKB) 8,738.7 Set Depth (ftKB) 10,987.0 Set Depth (TVD) … Wt/Len (l… 4.60 Grade L-80 Top Thread STL Liner Details Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com Nominal ID (in) 8,738.7 6,216.4 48.25 Aluminum Billet Aluminum Liner Top Billet 1.920 9,692.9 Deployment Sleeve Shorty deployment sleeve 1.920 Casing Description L1 Liner OD (in) 2 3/8 ID (in) 1.99 Top (ftKB) 9,306.9 Set Depth (ftKB) 10,975.0 Set Depth (TVD) … Wt/Len (l… 4.60 Grade L-80 Top Thread STL Liner Details Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com Nominal ID (in) 9,306.9 Aluminum Billet Liner top billet - Northern Solutions 1.920 Casing Description L1-02 Liner OD (in) 2 3/8 ID (in) 1.99 Top (ftKB) 9,598.7 Set Depth (ftKB) 11,717.0 Set Depth (TVD) … Wt/Len (l… 4.60 Grade L-80 Top Thread STL Liner Details Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com Nominal ID (in) 9,598.7 Aluminum Billet Aluminum Liner Top Billet 1.920 Tubing Strings Tubing Description Tubing – Production String Ma… 3 1/2 ID (in) 2.99 Top (ftKB) 33.0 Set Depth (ft… 8,760.8 Set Depth (TVD) (… 6,231.1 Wt (lb/ft) 9.30 Grade L80 Top Connection EUE Completion Details Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Nominal ID (in) OD Nominal (in) Make Model 33.0 33.0 0.03 Hanger 3.910 4.500 FMC TC-1A 474.9 474.9 0.29 Nipple - X 2.813 3.770 HES X 2,942.3 2,492.7 43.17 Mandrel – GAS LIFT 2.926 5.679 SLB MMG 4,888.2 3,754.9 50.87 Mandrel – GAS LIFT 2.926 5.679 SLB MMG 6,190.7 4,598.3 49.20 Mandrel – GAS LIFT 2.926 5.679 SLB MMG 7,176.2 5,214.1 51.94 Mandrel – GAS LIFT 2.926 5.679 SLB MMG 7,887.1 5,661.0 50.41 Mandrel – GAS LIFT 2.926 5.679 SLB MMG 8,437.0 6,016.3 48.98 Mandrel – GAS LIFT 2.926 5.679 SLB MMG 8,503.6 6,060.1 48.81 Packer 2.885 6.276 SLB Bluepack max 8,615.6 6,134.4 48.21 Nipple - X 2.813 3.770 HES "X" 8,663.0 6,166.0 48.23 Wedge Assembly 2.992 5.905 Northern solutions 8,677.0 6,175.3 48.24 Nipple - X 2.813 4.500 Northern Solutions "X" 8,682.8 6,179.2 48.24 Wedge Assembly 2.992 5.905 Northern solutions 8,696.8 6,188.5 48.25 Nipple - X 2.813 4.500 Northern Solutions "X" 8,739.0 6,216.6 48.25 Sleeve - Frac 2.770 4.490 Baker Huges 8,760.3 6,230.8 48.25 Wireline Guide 3.012 4.500 Halliburton Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Des Com Run Date ID (in) SN 8,626.4 6,141.6 48.21 PACKOFF Set NSAK Mono-Pak LTP. Set into liner top @ 8637' RKB. (Drawing of LTP in attachments) 2/17/2022 1.781 A22427201 8,646.0 6,154.7 48.22 WHIPSTOCK TOWS set at 8646', HS 1/28/2022 0.100 8,666.0 6,168.0 48.23 WHIPSTOCK WS set on X-Lock @ 8677 1/23/2022 0.100 8,677.0 6,175.3 48.24 CHOKE 2.813" X-LOCK W/ FLOW THRU SUB (1.75" ID / 18" OAL) 1/23/2022 1.780 3M-05, 3/8/2022 9:29:46 AM Vertical schematic (actual) L1-03 Liner; 8,637.3-11,717.0 L1-02 Liner; 9,598.7-11,717.0 L1-01 Liner; 8,738.7-10,987.0 L1 Liner; 9,306.9-10,975.0 PRODUCTION ORIGINAL; 2,725.0-8,948.2 FISH; 8,807.0 FISH; 8,801.0 Sleeve - Frac; 8,739.0 IPERF; 8,736.0-8,739.0 IPERF; 8,728.0-8,731.0 IPERF; 8,686.0-8,718.0 IPERF; 8,682.0-8,720.0 CHOKE; 8,697.0 Nipple - X; 8,696.8 WHIPSTOCK; 8,685.0 OBSTRUCTION; 8,690.0 FISH; 8,685.0 CHOKE; 8,677.0 Nipple - X; 8,677.0 IPERF; 8,672.0-8,676.0 RPERF; 8,666.0-8,682.0 WHIPSTOCK; 8,666.0 WHIPSTOCK; 8,646.0 OTHER; 8,637.0 PACKOFF; 8,626.4 Nipple - X; 8,615.6 Packer; 8,503.6 Mandrel – GAS LIFT; 8,436.9 Mandrel – GAS LIFT; 7,887.1 Mandrel – GAS LIFT; 7,176.2 Mandrel – GAS LIFT; 6,190.7 Mandrel – GAS LIFT; 4,888.2 SURFACE; 37.0-4,351.4 Mandrel – GAS LIFT; 2,942.3 7" Tie-Back Patch; 42.2-2,725.0 Production String 1 Cement; 34.0 ftKB Nipple - X; 474.9 CONDUCTOR; 38.0-115.0 Hanger; 33.0 KUP PROD KB-Grd (ft) 39.61 Rig Release Date 3/24/1987 3M-05 ... TD Act Btm (ftKB) 9,110.0 Well Attributes Field Name KUPARUK RIVER UNIT Wellbore API/UWI 500292170600 Wellbore Status PROD Max Angle & MD Incl (°) 52.78 MD (ftKB) 7,100.00 WELLNAME WELLBORE3M-05 Annotation Last WO: End Date 7/10/1992 H2S (ppm) 240 Date 12/10/2015 Comment Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Des Com Run Date ID (in) SN 8,685.0 6,180.6 48.25 WHIPSTOCK Set on X-Lock TOWS 8685' 1/22/2022 0.000 8,685.0 6,180.6 48.25 FISH 2.80 Dimond Speed Mill sitting on wipstock tray @ 8685' 1/22/2022 1.000 8,690.0 6,184.0 48.25 OBSTRUCTION NOTE: TIGHT SPOT BETWEEN LOWER TWO X- NIPPLES WHEN RUNNING LONG ASSEMBLIES (ABLE TO DRIFT 2.80" WITH NO ANOMALIES) 1/14/2022 2.992 8,697.0 6,188.6 48.25 CHOKE 2.813" X-LOCK W/ FLOW THRU SUB (1.75" ID / 18" OAL) 1/14/2022 1.750 8,801.0 6,257.9 48.24 FISH 1 1/2" GLV Empty Pocket; Fell downhole 7/27/1992 7/27/1992 0.000 8,807.0 6,261.9 48.24 FISH 1 1/2" OV Empty Pocket; Fell to Rathole 4/11/1993 4/11/1993 0.000 Mandrel Inserts St ati on N o/Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Make Model OD (in) Serv Valve Type Latch Type Port Size (in) TRO Run (psi) Run Date Com 6 2,942.3 2,492.7 43.17 Camco MMG 1 1/2 GLV RK 1,260.0 1/10/2022 5 4,888.2 3,754.9 50.87 Camco MMG 1 1/2 GLV RK 1,255.0 1/10/2022 4 6,190.7 4,598.3 49.20 Camco MMG 1 1/2 OV RK 0.250 1/13/2022 3 7,176.2 5,214.1 51.94 Camco MMG 1 1/2 DMY RK 1/10/2022 2 7,887.1 5,661.0 50.41 Camco MMG 1 1/2 DMY RK 1/10/2022 1 8,437.0 6,016.3 48.98 Camco MMG 1 1/2 DMY RK 1/10/2022 Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft )Type Com 8,666.0 8,682.0 6,168.0 6,178.6 A-2, 3M-05 3/19/1992 6.0 RPERF 2 1/8" Dyna Strip, 0 deg. ph 8,672.0 8,676.0 6,172.0 6,174.6 A-2, 3M-05 7/5/1987 1.0 IPERF 4" Csg Gun, 120 deg. ph 8,682.0 8,720.0 6,178.6 6,203.9 A-2, A-1, 3M-05 3/19/1992 6.0 IPERF 2 1/8" Dyna Strip, 0 deg. ph 8,686.0 8,718.0 6,181.3 6,202.6 A-1, 3M-05 7/5/1987 1.0 IPERF 4" Csg Gun, 120 deg. ph 8,728.0 8,731.0 6,209.3 6,211.3 A-1, 3M-05 7/5/1987 1.0 IPERF 4" Csg Gun, 120 deg. ph 8,736.0 8,739.0 6,214.6 6,216.6 A-1, 3M-05 7/5/1987 1.0 IPERF 4" Csg Gun, 120 deg. ph Notes: General & Safety End Date Annotation 7/15/2009 NOTE: IA x OA COMMUNICATION 3M-05, 3/8/2022 9:29:47 AM Vertical schematic (actual) L1-03 Liner; 8,637.3-11,717.0 L1-02 Liner; 9,598.7-11,717.0 L1-01 Liner; 8,738.7-10,987.0 L1 Liner; 9,306.9-10,975.0 PRODUCTION ORIGINAL; 2,725.0-8,948.2 FISH; 8,807.0 FISH; 8,801.0 Sleeve - Frac; 8,739.0 IPERF; 8,736.0-8,739.0 IPERF; 8,728.0-8,731.0 IPERF; 8,686.0-8,718.0 IPERF; 8,682.0-8,720.0 CHOKE; 8,697.0 Nipple - X; 8,696.8 WHIPSTOCK; 8,685.0 OBSTRUCTION; 8,690.0 FISH; 8,685.0 CHOKE; 8,677.0 Nipple - X; 8,677.0 IPERF; 8,672.0-8,676.0 RPERF; 8,666.0-8,682.0 WHIPSTOCK; 8,666.0 WHIPSTOCK; 8,646.0 OTHER; 8,637.0 PACKOFF; 8,626.4 Nipple - X; 8,615.6 Packer; 8,503.6 Mandrel – GAS LIFT; 8,436.9 Mandrel – GAS LIFT; 7,887.1 Mandrel – GAS LIFT; 7,176.2 Mandrel – GAS LIFT; 6,190.7 Mandrel – GAS LIFT; 4,888.2 SURFACE; 37.0-4,351.4 Mandrel – GAS LIFT; 2,942.3 7" Tie-Back Patch; 42.2-2,725.0 Production String 1 Cement; 34.0 ftKB Nipple - X; 474.9 CONDUCTOR; 38.0-115.0 Hanger; 33.0 KUP PROD 3M-05 ... WELLNAME WELLBORE3M-05 Page 1/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/19/2022 00:00 1/19/2022 01:00 1.00 MIRU, MOVE NUND P Nipple down bop's 0.0 0.0 1/19/2022 01:00 1/19/2022 04:00 3.00 MIRU, MOVE DMOB P Rig down checklist // Prep rig for move // TH rig down tiger tank line and remove tiger tank // Prep shop and HWH for move // 0.0 0.0 1/19/2022 04:00 1/19/2022 07:00 3.00 MIRU, MOVE DMOB P Continue working checklists. Trucks requested ol location @ 0700 0.0 0.0 1/19/2022 07:00 1/19/2022 10:12 3.20 MIRU, MOVE DMOB T Trucks arrive on location @ 9:15. Sows not configured properly to load shop. Weights loaded onto sows with long winch cables 0.0 0.0 1/19/2022 10:12 1/19/2022 11:42 1.50 MIRU, MOVE DMOB P PJSM W /NES for rig move, Hook up pits and pull off 0.0 0.0 1/19/2022 11:42 1/19/2022 13:00 1.30 MIRU, MOVE DMOB T Hook up to sow to sub. Having tranmission issues with NES SOW. 0.0 0.0 1/19/2022 13:00 1/19/2022 14:00 1.00 MIRU, MOVE DMOB P Pull Sub off well, Rig down cellar herculite and berming. Pull around pad past 7ES satalite camp. Hook up Jeeps on modules 0.0 1/19/2022 14:00 1/19/2022 16:30 2.50 MIRU, MOVE MOB P Leave 1L pad for 3M 0.0 0.0 1/19/2022 16:30 1/19/2022 21:00 4.50 MIRU, MOVE MOB T Stand by for NES to fix brake problem on sow 0.0 0.0 1/19/2022 21:00 1/19/2022 23:00 2.00 MIRU, MOVE MOB P Continue move to CPF3 0.0 0.0 1/19/2022 23:00 1/20/2022 00:00 1.00 MIRU, MOVE MOB T NES truck on pits failed. Swap out sow. 0.0 0.0 1/20/2022 00:00 1/20/2022 02:00 2.00 MIRU, MOVE MOB P Continue moce CPF 3 to 3M-05 0.0 0.0 1/20/2022 02:00 1/20/2022 02:30 0.50 MIRU, MOVE MOB P Modules on location, Remove jeeps 0.0 0.0 1/20/2022 02:30 1/20/2022 05:00 2.50 MIRU, MOVE MOB P Prep cellar area. Shovel snow from around well. Lay down herculite, Spot sub over well. Lay down matting boards 0.0 0.0 1/20/2022 05:00 1/20/2022 07:00 2.00 MIRU, MOVE MOB P Sub in place. Lay down matts for pits. Spot pits. Lay rest of matts. Set down sub 0.0 0.0 1/20/2022 07:00 1/20/2022 12:00 5.00 MIRU, MOVE RURD P PJSM. Safe out outside rig. set stairs and landings. R/U PUTZ. 0.0 0.0 1/20/2022 12:00 1/20/2022 15:00 3.00 MIRU, WHDBOP NUND T Go to lower stack for nipple up. Unable to get draw works to move, Trouble shoot. Lift stack off blocke with cellar bridge cranes. Nipple up stack 0.0 0.0 1/20/2022 15:00 1/20/2022 16:00 1.00 MIRU, WHDBOP NUND P Nipple up, fill stack 0.0 0.0 1/20/2022 16:00 1/21/2022 00:00 8.00 MIRU, WHDBOP BOPE P Start full BOPE test. Test witnessed by Guy Cook, AOGCC 250/5000 Ann. 250/2500 0.0 0.0 1/21/2022 00:00 1/21/2022 02:00 2.00 MIRU, WHDBOP BOPE P Start full BOPE test. Test witnessed by Guy Cook, AOGCC 250/5000 Ann. 250/2500 0.0 0.0 1/21/2022 02:00 1/21/2022 05:00 3.00 MIRU, WHDBOP CTOP P Grease valves , extended drawdown test , valve alignments, clean up test joint , 0.0 0.0 1/21/2022 05:00 1/21/2022 09:00 4.00 MIRU, WHDBOP CTOP P Pressure test PDL's and tiger tank line 0.0 0.0 1/21/2022 09:00 1/21/2022 10:00 1.00 SLOT, WELLPR BHAH P PJSM, Bring up Northern Soulotions whipstock tray Put in well 0.0 0.0 1/21/2022 10:00 1/21/2022 12:18 2.30 PROD1, WHPST BHAH P Pressure deploy BHA #1 NS Whipstock. Skid injector to floor. Install floats in UQC. M/U to coiltrack and surface test, Strip on well 0.0 73.5 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 2/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/21/2022 12:18 1/21/2022 14:12 1.90 PROD1, WHPST TRIP P Trip in well BHA #1, Min rate on seawater 73.5 8,500.0 1/21/2022 14:12 1/21/2022 14:18 0.10 PROD1, WHPST DLOG P Log K1 for tie in, Correct -6', PUW=35K, Close EDC 8,500.0 8,532.0 1/21/2022 14:18 1/21/2022 14:30 0.20 PROD1, WHPST TRIP P Continue in well. RIW=15K. 8,532.0 8,696.0 1/21/2022 14:30 1/21/2022 14:48 0.30 PROD1, WHPST TRIP P Set down 8697' with 5K down weight. Pick up to 35K, RIH to 1000 LBS DHWOB.Bring pump online See tool shift @ 3300. DHWOB=7K. PUH off tray, PUW=35K 8,696.0 8,680.0 1/21/2022 14:48 1/21/2022 16:48 2.00 PROD1, WHPST TRIP P Open EDC. Flush well bore with seawater, 15 BBls out POOH 8,680.0 70.0 1/21/2022 16:48 1/21/2022 18:18 1.50 PROD1, WHPST PULD P Pressure Un-deploy BHA# 1 WS setting tool 70.0 0.0 1/21/2022 18:18 1/21/2022 20:25 2.13 PROD1, WHPST PULD P Pressure Deploy BHA# 2 Windown mill assembly // X-treme .6° AKO w/ NS string reamer and window mill 0.0 75.0 1/21/2022 20:25 1/21/2022 22:07 1.70 PROD1, WHPST TRIP P Tag up set counters // RIH w/ BHA# 2 X -treme .6° AKO w/ ns string reamer and windwo mill // 75.0 8,490.0 1/21/2022 22:07 1/21/2022 22:19 0.20 PROD1, WHPST DLOG P Tie in K1 for -6' correction 8,490.0 8,532.0 1/21/2022 22:19 1/21/2022 22:49 0.50 PROD1, WHPST CIRC P Circulate out seawater 8,665.0 8,665.0 1/21/2022 22:49 1/21/2022 23:00 0.17 PROD1, WHPST TRIP P Dry tag WS @ 8686 // PU Wt. 34K 8,532.0 8,685.0 1/21/2022 23:00 1/22/2022 00:00 1.00 PROD1, WHPST CTOP T Stalled in window // became bit stuck // pulled up to 45K after consulting town and popped free // Started pumps and stalled @ 8678' // Picked up clean and tied in // 8,686.0 8,686.0 1/22/2022 00:00 1/22/2022 02:06 2.10 PROD1, WHPST MILL P Bring pumps to rate 1.8 3800 psi 520 diff ann 3715 // Work slowly down to 8685.21' WOB .21 OBM 1.8 // 3900 // 518 1'/hr Milled to 8686.73 Stalled and got bit stuck 8,686.0 8,686.0 1/22/2022 02:06 1/22/2022 02:18 0.20 PROD1, WHPST CTOP T Picked up pulled -9 , push down and pump popped free // picked up and hung up in x-nipple @ 8677 pull -9k , run down and popped free picked up clean 8,686.0 8,686.0 1/22/2022 02:18 1/22/2022 03:48 1.50 PROD1, WHPST WAIT T Wait for decision from engineers 8,686.0 8,250.0 1/22/2022 03:48 1/22/2022 05:36 1.80 PROD1, WHPST TRIP T POOH for caliper run 8,250.0 75.0 1/22/2022 05:36 1/22/2022 07:00 1.40 PROD1, WHPST BHAH T At surface, tag up abd space out, PUD BHA #2, BHA 2 out without NS long shank window mill 75.0 0.0 1/22/2022 07:00 1/22/2022 10:00 3.00 PROD1, WHPST WAIT T Consult with town team Formulate plan forward. S/B for slickline unit 0.0 0.0 1/22/2022 10:00 1/22/2022 14:30 4.50 PROD1, WHPST SLKL T Slickline on location, PJSM. R/U slickline unit on rig 0.0 0.0 1/22/2022 14:30 1/22/2022 19:00 4.50 PROD1, WHPST SLKL T M/U 2.75" LIB, PT Lubricator to 3K, Trip in well. Set down @ 8667 SLM // RIH with 2.5 LIB set down at 8677 SLM pull out of hole with LIB send pics to town for plan forward 0.0 0.0 1/22/2022 19:00 1/22/2022 19:48 0.80 PROD1, WHPST WAIT T Wait for plan forward 0.0 0.0 1/22/2022 19:48 1/22/2022 21:48 2.00 PROD1, WHPST SLKL T Run blind on slick line to jar down on mill 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 3/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/22/2022 21:48 1/23/2022 00:00 2.20 PROD1, WHPST SLKL T Run memory caliper on slick line 0.0 0.0 1/23/2022 00:00 1/23/2022 01:30 1.50 PROD1, WHPST SLKL T Run memory caliper on slick line 0.0 0.0 1/23/2022 01:30 1/23/2022 04:00 2.50 PROD1, WHPST SLKL T Run x-lock on slick line set in X-nipple @ 8677' 0.0 0.0 1/23/2022 04:00 1/23/2022 06:00 2.00 PROD1, WHPST SLKL T Run check set to confirm s-lock is set on slick line 0.0 0.0 1/23/2022 06:00 1/23/2022 07:30 1.50 PROD1, WHPST SLKL T Check set on surface, sheared pin. Lock is shut. R/D Slick line unit 0.0 0.0 1/23/2022 07:30 1/23/2022 09:00 1.50 PROD1, WHPST WPST T PJSM, Run Northern whipstock tray, BHA #3 0.0 73.5 1/23/2022 09:00 1/23/2022 11:00 2.00 PROD1, WHPST TRIP T RIH BHA #3 73.5 8,500.0 1/23/2022 11:00 1/23/2022 11:12 0.20 PROD1, WHPST DLOG T Log K1 for -8' correction, PUW=32K, Shut EDC 8,500.0 8,677.0 1/23/2022 11:12 1/23/2022 11:30 0.30 PROD1, WHPST TRIP T Continue in well, Set down @ 8677. Pick up to neutral weight. Pumps online. See tool shift @ 3800 PSI. PUW=31K, Top of whipstock=8666 8,677.0 8,677.0 1/23/2022 11:30 1/23/2022 13:12 1.70 PROD1, WHPST TRIP T POOH with whipstock setting tools, BHA #3 8,677.0 69.0 1/23/2022 13:12 1/23/2022 14:24 1.20 PROD1, WHPST BHAH T At surface, tag up and space out. PJSM PUD BHA #3 69.0 0.0 1/23/2022 14:24 1/23/2022 15:30 1.10 PROD1, WHPST BHAH T PJSM. PD BHA #4 window milling BHA. Tag up. Set depth counters 0.0 74.7 1/23/2022 15:30 1/23/2022 17:48 2.30 PROD1, WHPST TRIP T RIH, BHA #4 Tie in K1 -7' correction // Dry tag 8667' 74.7 8,667.0 1/23/2022 17:48 1/24/2022 00:00 6.20 PROD1, WHPST MILL P Mill window F/ 8665.8' T/8668.54 1.8 bpm // 4000 pp // diff 720 Ann 3701 8,667.0 8,668.5 1/24/2022 00:00 1/24/2022 07:42 7.70 PROD1, WHPST MILL P Mill window F/ 8668.54' T/8669 1.8 bpm // 4200 pp // diff 720 Ann 3667 8,668.5 8,669.5 1/24/2022 07:42 1/24/2022 09:30 1.80 PROD1, WHPST MILL P P/U to check weight on bit Pressure. Stalled at top of window 8665'. Popped free Ream back down trat area 2 FPM 8,669.5 8,670.0 1/24/2022 09:30 1/24/2022 15:30 6.00 PROD1, WHPST MILL P 8670, Mill, 1.8 BPM @ 3949 PSI FS. DHWOB=3.3K. Very low ROP. Get metal and resin pieces in sample. Try different WOB minor pump rate cheangers. Confer with town. Little to no progress 8,670.0 8,670.4 1/24/2022 15:30 1/24/2022 15:54 0.40 PROD1, WHPST MILL P Pull wiper / ream to top of tray, PUW=31K, Ream down 1 FPM clean 8,670.4 8,670.4 1/24/2022 15:54 1/24/2022 16:30 0.60 PROD1, WHPST MILL P Back on bottom 1.8 BPM @ 3993 PSI FS 8,670.4 8,670.0 1/24/2022 16:30 1/24/2022 18:24 1.90 PROD1, WHPST TRIP T POOH BHA #4. PUW=30K 8,670.0 63.0 1/24/2022 18:24 1/24/2022 20:18 1.90 PROD1, WHPST BHAH T Tag up space out. PJSM PUD BHA #4 Mill and string reamer. Mill and reamer out at 2.80 No Go. Motor felt good 63.0 0.0 1/24/2022 20:18 1/24/2022 21:18 1.00 PROD1, WHPST BHAH T M/U BHA #5 Window milling BHA with new window mill, different string reamer. and replacement motor. AKO=.6. Pressure deploy. Make up to coil and surface test tool - Good. Strip injector on well. Tag set counters 0.0 74.3 1/24/2022 21:18 1/24/2022 22:54 1.60 PROD1, WHPST TRIP T RIH BHA #5 74.3 8,500.0 1/24/2022 22:54 1/24/2022 23:12 0.30 PROD1, WHPST DLOG T Log K1 for -6' correction, Close EDC, PUW=32K 8,500.0 8,529.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 4/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/24/2022 23:12 1/24/2022 23:24 0.20 PROD1, WHPST TRIP T RIH to mill window. Start rolling pump 1.82 BPM @ 3893 PSI FS, Diff press 500 PSI, 8,529.0 8,668.0 1/24/2022 23:24 1/25/2022 00:00 0.60 PROD1, WHPST MILL T Torgue up @ 8668 Get TF back to HS, 1.8 BPM # 3893 PSI FS. See WOB @ 8671.4 get DHWOB. Keep rolling in to 8673.1. Stop with 3K WOB, 700 PSI diff. Set brake. watch for mill off 8,668.0 8,672.0 1/25/2022 00:00 1/25/2022 08:30 8.50 PROD1, WHPST MILL T Mill ahead on window PP 4000 Diff 615 Ann 3718 8,672.0 8,673.6 1/25/2022 08:30 1/25/2022 09:00 0.50 PROD1, WHPST WPRT T Wiper 15' 8,673.6 8,673.6 1/25/2022 09:00 1/25/2022 16:00 7.00 PROD1, WHPST MILL T OBM 1.8 bpm // 3890 FS // 250 WHP // 473 Diff // 3709 Ann // Free Spin Numbers ROP - 0.5' / 7 hrs - 0.7 ft/hr Started to see drill off @ 8674.21 @ 16:42 8,673.6 8,674.1 1/25/2022 16:00 1/25/2022 21:36 5.60 PROD1, WHPST MILL T OBM - IA 92 psi, OA 5 psi, WH 266 psi, CT 4080 psi @ 1.84 bpm in / 1.72 bpm out. BHP 3719 psi, free spin diff 473 psi. Pumped 5x5 and it seemed as if we saw some movement and motor work. Tried 3 more sweeps with limited to no real change. 8,674.1 8,674.5 1/25/2022 21:36 1/25/2022 21:48 0.20 PROD1, WHPST TRIP T PU Wt 32 k lbs, Park above WS - open EDC, PUH 8,674.5 8,500.0 1/25/2022 21:48 1/25/2022 21:54 0.10 PROD1, WHPST DLOG T Tie into K1 for zero correction 8,500.0 8,528.0 1/25/2022 21:54 1/25/2022 23:24 1.50 PROD1, WHPST TRIP T POOH w open EDC @ 2.0 bpm in and d 1.62 bpm out Preload PDL W BHA #5 upper in DS PDL. 8,528.0 64.5 1/25/2022 23:24 1/26/2022 00:00 0.60 PROD1, WHPST PULD T Tag up, space out, PUD BHA #5 64.5 64.5 1/26/2022 00:00 1/26/2022 00:42 0.70 PROD1, WHPST PULD T Continue to PUD BHA #5 Speed mill 2.80" go, 2.79" no Reamer 2.81" go, 2.80" no 64.5 0.0 1/26/2022 00:42 1/26/2022 02:30 1.80 PROD1, WHPST PULD T PD BHA #5 - window milling assembly - note dropped window milling pup and added agitator, running string mill and speed mill from first attempt at WS #2 - BHA #4. 0.0 69.4 1/26/2022 02:30 1/26/2022 04:18 1.80 PROD1, WHPST TRIP T Bump up, set counters, RIH with BHA #6 window milling assembly + agitator, park close EDC, shallow test agitator. 69.4 8,500.0 1/26/2022 04:18 1/26/2022 04:30 0.20 PROD1, WHPST DLOG T Tie into the K1 for -6' correction. 8,500.0 8,520.0 1/26/2022 04:30 1/26/2022 04:42 0.20 PROD1, WHPST TRIP T Continue in hole 8,520.0 8,673.8 1/26/2022 04:42 1/26/2022 07:42 3.00 PROD1, WHPST MILL T IA 0 psi, OA 1 psi, WH 336 psi, CT 4235 psi @ 1.84 bpm in 1.67 out, BHP 3747 psi, Free spin diff 856, RIH Wt 14.14 k lbs, OBM Tag 8673.86' 8,673.8 8,673.8 1/26/2022 07:42 1/26/2022 09:30 1.80 PROD1, WHPST TRIP T POOH for new mill 8,673.8 70.0 1/26/2022 09:30 1/26/2022 11:00 1.50 PROD1, WHPST PULD T PUD bha 6 and lay down 70.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 5/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/26/2022 11:00 1/26/2022 12:12 1.20 PROD1, WHPST PULD T PD BHA# 7 .6° AKO w/ NS hybrid mill 0.0 70.0 1/26/2022 12:12 1/26/2022 14:42 2.50 PROD1, WHPST PULD T RIH w/ BHA # 7 // Tie in K1 for -6.5 correction // close EDC // PU Wt. 32K // Tag @ 70.0 8,674.0 1/26/2022 14:42 1/26/2022 21:24 6.70 PROD1, WHPST MILL T IA 0 psi, OA 1 psi, WH 278 psi, CT 3955 psi @ 1.80 bpm in 1.71 out, BHP 3789 psi, Free spin diff 500, RIH Wt 14.14 k lbs, OBM Tag 8673.86' Stack WOB up to 4 k with little to no respons in motor work. Send two beaded sweeps with little respons in motor work of WOB. PU ~ 8 k CT wt with no change in WOB or motor work. - BHA appears to be in a bind somewher above the ream/mill and below the Drilling Performance Sub 8,674.0 8,674.0 1/26/2022 21:24 1/26/2022 21:42 0.30 PROD1, WHPST DLOG T PU Wt 30 k lbs, PUH and tie into the K1 for +1' correction - pinched choke and pushed away ~ 1.5 bbls to ensure we can bulhead methanol during camera log. 8,674.0 8,531.0 1/26/2022 21:42 1/26/2022 22:00 0.30 PROD1, WHPST DLOG T Park at 8574.75' and paint yellow flag in anticipation of camera run. Open EDC 8,531.0 8,574.8 1/26/2022 22:00 1/26/2022 23:24 1.40 PROD1, WHPST TRIP T POOH W BHA #7, pumping 2 BPM 8,574.8 74.0 1/26/2022 23:24 1/27/2022 00:00 0.60 PROD1, WHPST PULD T Bump up, space out, PUD BHA # 7 milling assembly. 74.0 74.0 1/27/2022 00:00 1/27/2022 01:24 1.40 PROD1, WHPST PULD T Continue to PUD BHA #7, Fresh water and MetOH trucks on location. Camera XO and shroud on location. 74.0 0.0 1/27/2022 01:24 1/27/2022 02:48 1.40 PROD1, WHPST RURD T Camera man on location. Rig up camera. LRS on location, spot up and rig up tro MetOH tanker / customer line. 0.0 0.0 1/27/2022 02:48 1/27/2022 06:00 3.20 PROD1, WHPST WAIT T Camera hand round tripping to deadhorse for female to female BCN connection. 0.0 0.0 1/27/2022 06:00 1/27/2022 07:00 1.00 PROD1, WHPST PULD T PU and PD BHA #8 - camera assembly. Test camera at surface 0.0 16.0 1/27/2022 07:00 1/27/2022 11:15 4.25 PROD1, WHPST WAIT T Trouble shoot camera 16.0 16.0 1/27/2022 11:15 1/27/2022 13:21 2.10 PROD1, WHPST TRIP T Tag up // Pressure up // open master and RIH with camera assembly // Tie in EOP flag -.22' correction 16.0 8,616.0 1/27/2022 13:21 1/27/2022 14:21 1.00 PROD1, WHPST DISP T Circulate clean fresh water into well bore for camera 8,616.0 8,616.0 1/27/2022 14:21 1/27/2022 16:21 2.00 PROD1, WHPST ELOG T Video log well 8,616.0 8,673.0 1/27/2022 16:21 1/27/2022 17:21 1.00 PROD1, WHPST CIRC T Circulate well to Milling fluid 8,673.0 8,615.0 1/27/2022 17:21 1/27/2022 18:57 1.60 PROD1, WHPST TRIP T POOH chasing water out of hole. 8,615.0 16.0 1/27/2022 18:57 1/27/2022 20:33 1.60 PROD1, WHPST PULD T Lay down BHA #8, camera run, over a closed valve. 16.0 0.0 1/27/2022 20:33 1/27/2022 21:03 0.50 PROD1, WHPST SVRG T Service injector 0.0 0.0 1/27/2022 21:03 1/27/2022 22:21 1.30 PROD1, WHPST PULD T PU and PD BHA #9 - Baker 3.5" XL whipstock. 0.0 72.9 1/27/2022 22:21 1/28/2022 00:00 1.65 PROD1, WHPST TRIP T RIH W BOT whipstock , EDC open, counter issue, 72.9 7,562.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 6/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/28/2022 00:00 1/28/2022 00:12 0.20 PROD1, WHPST TRIP T RIH W BOT whipstock , EDC open, counter issue, 7,562.0 8,500.0 1/28/2022 00:12 1/28/2022 00:18 0.10 PROD1, WHPST DLOG T Tie into the K1 for a -7' correction. Close EDC. PU Wt 30 k lbs, 8,500.0 8,518.0 1/28/2022 00:18 1/28/2022 00:36 0.30 PROD1, WHPST WPST T Continue to RIH to set depth bit dept 8656.52' PU to 28 k lbs. Tray oriented HS. CT Wt 24.48 k lbs, WOB 0.15. Online w pump down the coil. WOB to 4.27 k lbs, Shear at 4462 psi. PU to WOB at 1.5 k, set down 3 k lbs. Good set! 8,518.0 8,656.0 1/28/2022 00:36 1/28/2022 02:18 1.70 PROD1, WHPST TRIP T PUH, park, open EDC POOH. 8,656.0 62.0 1/28/2022 02:18 1/28/2022 03:48 1.50 PROD1, WHPST PULD T PUD BHA # 9, whipstock setting assembly. 62.0 0.0 1/28/2022 03:48 1/28/2022 05:18 1.50 PROD1, WHPST PULD T PD BHA # 10, window milling assembly. BHC diamond speed mill and reamer. 0.0 74.0 1/28/2022 05:18 1/28/2022 06:48 1.50 PROD1, WHPST TRIP T RIH w BHA #10 74.0 8,500.0 1/28/2022 06:48 1/28/2022 07:00 0.20 PROD1, WHPST DLOG T Tie into the K1 for a 7.5' correction Pu Wt 31K Dry Tag WS @ 8646 8,500.0 8,646.0 1/28/2022 07:00 1/28/2022 13:12 6.20 PROD1, WHPST MILL T Mill exit window F/ 8646' T/ 8652' 3.5 exit @ 8649.3' 8,646.0 8,652.0 1/28/2022 13:12 1/28/2022 13:36 0.40 PROD1, WHPST REAM P Perform reaming passes @ HS and dry drift dry drift good 8,652.0 8,652.0 1/28/2022 13:36 1/28/2022 15:36 2.00 PROD1, WHPST TRIP P POOH for BOP test 8,652.0 70.0 1/28/2022 15:36 1/28/2022 16:42 1.10 PROD1, WHPST PULD P PUD BHA # 10 Window mill assembly 70.0 0.0 1/28/2022 16:42 1/28/2022 16:57 0.25 PROD1, WHPST PULD P Lay down motor and pup jt 0.0 0.0 1/28/2022 16:57 1/28/2022 20:30 3.55 PROD1, WHPST CTOP P Turn coil over to water while jetting the stack. Pop off, pull checks, stab on, PT stripperr and inner reel iron to 250/5000 psi - good 0.0 0.0 1/28/2022 20:30 1/28/2022 23:30 3.00 PROD1, WHPST CTOP P Reconfigure, install night cap for shell test - Crew change, valve check list grease, valve crew serviced tree and tangos. 0.0 0.0 1/28/2022 23:30 1/29/2022 00:00 0.50 PROD1, WHPST BOPE P Shell test 250/5000 psi - good - BOP test, witness waived, Austin McLeod - AOGCC. Test 1. Swab 2 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 7/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/29/2022 00:00 1/29/2022 06:30 6.50 PROD1, WHPST BOPE P Test 2. Blind/Shear, BOP TV2, Charlie 4, 5, 8, &12 Test 3. BOP TV 1, Charlie 3, 7, & 11 Test 4. Manual choke D & Super choke C Test 5. Romeo 3, Bleeder 3, Tango 2, Charlie 2, & 10 Test 6. Charlie 1, 9, Bravo 5, and Tango 1 – install TIW test joint Test 7. Lower 2” pipe slip rams, TIW #1, Romeo 1, Bleeder 1 Test 8. Annular BOP Test 9. Upper 2” pipe slip rams, Bravo 6, & 8 Test 10. Bravo 7 – swap out 2” test joint for 2-3/8” Test 11. 2-3/8” pipe slip rams, TIW#2 – check N2 levels, swap to 2” test joint Test 12. Draw down accumulator. Koomy pressure, close all record stable pressure, time to increase 200 psi, entire recovery time Test 13. Stab injector and line up to reverse circulate coil, test inner reel valve and stripper. Tested all gas detectors, pits, cellar, Verified flow alarms - PVT 0.0 0.0 1/29/2022 06:30 1/29/2022 07:30 1.00 PROD1, WHPST CTOP P Rig down test eqipment and prep for cutting coil connector off // Cut 21' of coil for flat spot and pitted pipe 0.0 0.0 1/29/2022 07:30 1/29/2022 09:30 2.00 PROD1, WHPST CTOP P Re-head coil and install Baker Directional upper quick pull test coil connector to 35K pressure test to 3500 psi Meg test 70.4 / greater than 2000 Baker Upper quick leaking 0.0 0.0 1/29/2022 09:30 1/29/2022 10:30 1.00 PROD1, WHPST PRTS P Baker to trouble shoot leak in upper quick 0.0 0.0 1/29/2022 10:30 1/29/2022 11:00 0.50 PROD1, WHPST CIRC P Circulate coil over to milling fluid // blow down choke 0.0 0.0 1/29/2022 11:00 1/29/2022 11:30 0.50 PROD1, WHPST SFTY P Check valve alignment for pressure deploy / PJSM for pressure deploy 0.0 0.0 1/29/2022 11:30 1/29/2022 13:00 1.50 PROD1, WHPST PULD P Pressure Deploy BHA# 11 1.25° AKO / Fat radius mill 2.80 0.0 70.0 1/29/2022 13:00 1/29/2022 15:00 2.00 PROD1, WHPST TRIP P RIH // Tie in K1 for -7.5' correction // Dry tag WS @ 70.0 8,652.0 1/29/2022 15:00 1/29/2022 22:00 7.00 PROD1, WHPST MILL P OBM Free Spin 1.8 bpm // 4306 pp // Diff 711 // Ann 3766 // WHP 210 Observe drop in WOB & motor work @ 8654.8' - mill off Continue to 8656.25' - Mill 100% out of 7" Pre load build BHA. Mill F/ 8652' T/ 8656.25 8,652.0 8,656.3 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 8/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/29/2022 22:00 1/29/2022 23:54 1.90 PROD1, WHPST MILL P Reamer fully out, Start milling ahead targeting 1.5 k WOB then working up to 2.5k WOB Derik hand reports seeing dirt on the shaker. Zero bottoms up, catch sample for Geo to verify. OA 4 psi, IA 0 psi, WH 242 psi, CT 4692 psi @ 1.80 bpm. BHP 3783 psi, CT Wt 12.33 k lbs, WOB 1.37 k lbs, ROP 2.9 ft/hr. * Geo confirms formation in 8657' sample - C4 with some metal. * TD Rat hole 8672' 8,656.3 8,672.0 1/29/2022 23:54 1/30/2022 00:00 0.10 PROD1, WHPST REAM P PU Wt 31 k lbs, 10x10 TW sweep timed out Start reaming passes Midnight depth 8,656' 8,672.0 8,656.0 1/30/2022 00:00 1/30/2022 02:00 2.00 PROD1, WHPST REAM P PU Wt 31 k lbs, 10x10 TW sweep timed out Perform reaming passes @ HS - 50 lbs motor work @ 8650 & 8645' 30R ~50-60 psi motor work 8650.5 and 8645' 30L ~ 34 psi motor work 8560 and 8646' LS ~ 130 psi motor work 8650 and 8646' pump additional 5x5 sweep 8,656.3 8,641.0 1/30/2022 02:00 1/30/2022 02:18 0.30 PROD1, WHPST REAM P Dry drift - Clean, Tag TD * Good window! 8,641.0 8,672.0 1/30/2022 02:18 1/30/2022 03:48 1.50 PROD1, WHPST TRIP P PU Wt 29 k lbs POOH pumping 1.92 bpm, park and open EDCat surface. 8,672.0 74.0 1/30/2022 03:48 1/30/2022 05:24 1.60 PROD1, WHPST TRIP P PUD BHA #11, Window milling assembly while pumping managed pressure. 74.0 0.0 1/30/2022 05:24 1/30/2022 06:24 1.00 PROD1, WHPST CIRC P Stab injecter, jet stack, POP off - Crew change. 0.0 0.0 1/30/2022 06:24 1/30/2022 08:06 1.70 PROD1, DRILL PULD P PJSM // Pick up x-treme 2.3° AKO motor w/ HCC bit // Pressure Deploy BHA# 12 Build Assembly 0.0 72.0 1/30/2022 08:06 1/30/2022 09:54 1.80 PROD1, DRILL TRIP P Tag up set counters // RIH EDC open pump min rate // 72.0 8,500.0 1/30/2022 09:54 1/30/2022 10:06 0.20 PROD1, DRILL DLOG P Log K1 for -3.5' correction 8,500.0 8,525.0 1/30/2022 10:06 1/30/2022 10:24 0.30 PROD1, DRILL TRIP P Close EDC // PU Wt. 31K // RIH window clean 8,525.0 8,672.0 1/30/2022 10:24 1/30/2022 13:42 3.30 PROD1, DRILL DRLG P OBD 1.83 in 1.72 out // pp 4338 // Diff 670 // Ann 3787 // WHP 282 8,672.0 8,850.0 1/30/2022 13:42 1/30/2022 16:00 2.30 PROD1, DRILL TRIP P POOH for build assembly // jog above window and open EDC // POOH Heavy pick ups 8850 - 8700 Multiple pulling heavy at bit -3k DHWOB stop at 6665 and close EDC 8,850.0 70.0 1/30/2022 16:00 1/30/2022 18:00 2.00 PROD1, DRILL PULD P Tag up // Space out 1.2' // PUD BHA# 12 build assembly 70.0 0.0 1/30/2022 18:00 1/30/2022 18:30 0.50 PROD1, DRILL SVRG P Inspect reel, verify torque on reel hubs. 0.0 0.0 1/30/2022 18:30 1/30/2022 20:30 2.00 PROD1, DRILL PULD P PD BHA # 13, ERD Drilling assembly - 150 hr agitator - 0.6° AKO motor and HYC A3 bit. Check and replace pack offs. 0.0 78.2 1/30/2022 20:30 1/30/2022 21:30 1.00 PROD1, DRILL TRIP P Bump up, set counters, RIH 78.2 500.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 9/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/30/2022 21:30 1/30/2022 21:48 0.30 PROD1, DRILL SVRG P Park, inspect and torque saddle clamps, minimal movement. 500.0 500.0 1/30/2022 21:48 1/30/2022 22:54 1.10 PROD1, DRILL TRIP P Continue to RIH 500.0 8,490.0 1/30/2022 22:54 1/30/2022 23:24 0.50 PROD1, DRILL DLOG P Tie into the K1 for -6' correction. PU Wt 31 k lbs, close EDC Continue in hole - Window clean - Log RA tag - 8653 Start new mud down the coil. 8,490.0 8,850.0 1/30/2022 23:24 1/31/2022 00:00 0.60 PROD1, DRILL DRLG P OA 12 psi, IA 0 psi, WH 418 psi, CT 4604 psi @ 1.81 bpm in BHP 3801 psi, Free spin diff RIH Wt 12.7, OBD, 11.6 k lbs, 0.8 k lbs, ROP ~170 ft/hr. Took some gas cut mud to the tiger tank during mud swap. * New mud at the bit 8876' 8,850.0 8,890.0 1/31/2022 00:00 1/31/2022 00:42 0.70 PROD1, DRILL DRLG P OBD, New mud all the way around, bring mud back inside. PU 32 k lbs New mud parameters, CT 4472 psi @ 1.81 bpm in and 1.79 bpm out, BHP 3824 psi, free spin diff 980 psi. CT Wt 11.5 k lbs, WOB 1.4 k lbs, Get driller lined out, start targeting ~2 k WOB - ROP 8,890.0 8,991.0 1/31/2022 00:42 1/31/2022 01:12 0.50 PROD1, DRILL WPRT P DD computer issue - PU Wt 34 k lbs, 8,991.0 8,991.0 1/31/2022 01:12 1/31/2022 03:30 2.30 PROD1, DRILL DRLG P BOBD - OA 14 psi, IA 0 psi, WH 339 psi, CT 4847 psi @ 1.81 bpm in and 1.81 bpm out, BHP 3816 psi, Free spin 1087 psi . CT Wt 9.3 k lbs, WOB 2.77 k lbs, pump 5/5 sweep, PU wt 34 k lbs as sweep exits,BOBD ROP over interval drilled 140 ft/hr 8,991.0 9,315.0 1/31/2022 03:30 1/31/2022 04:30 1.00 PROD1, DRILL WPRT P PU Wt 34 k lbs on Geo wiper- Shelter re-log of build section to verify high dog legs - no change Jog while waiting - RBIH 9,315.0 9,315.0 1/31/2022 04:30 1/31/2022 09:54 5.40 PROD1, DRILL DRLG P OA 14 psi, IA 0 psi, WH 359 psi, CT 4634 psi @ 1.85 bpm in and 1.76 bpm out. BHP 3890 psi, Free spin diff 1004 psi. CT RIH Wt 10.4 k lbs, OBD Ct Wt 6.8 k lbs WOB 2.57, ROP 130 ft/min 9,315.0 9,800.0 1/31/2022 09:54 1/31/2022 10:21 0.45 PROD1, DRILL WPRT P Wiper to 8950' Pumped 5 X 5 sweeps 9,800.0 8,950.0 1/31/2022 10:21 1/31/2022 10:48 0.45 PROD1, DRILL WPRT P Wiper back to bottom stack @ 9415' , 9500' performed bha wiper RIH to bottom @ 9800 8,950.0 9,800.0 1/31/2022 10:48 1/31/2022 12:18 1.50 PROD1, DRILL DRLG P BOBD - OA 13 psi , IA 0 psi , WHP 330 psi , CT 4750 psi @ 1.85 bpm in and 1.76 bpm out, BHP 3936, Free spin diff 1084 , CT. WT. 5K lbs, WOB 2.5k PU WT 37K Drill F/ 9800 T/ 9962 9,800.0 9,962.0 1/31/2022 12:18 1/31/2022 13:06 0.80 PROD1, DRILL WPRT P PU Wt 37K Geo wiper for tie in // Tie in RA tag for +5' correction 9,962.0 8,686.0 1/31/2022 13:06 1/31/2022 13:54 0.80 PROD1, DRILL WPRT P Wiper back to bottom T/9962' 8,686.0 9,962.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 10/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/31/2022 13:54 1/31/2022 14:30 0.60 PROD1, DRILL DRLG P BOBD - OA 13 psi , IA 0 psi , WHP 350 psi , CT 4770 psi @ 1.85 bpm in and 1.76 bpm out, BHP 3936, Free spin diff 1084 , CT. WT. 5K lbs, WOB 2.5k PU WT 37K Drill F/ 9962 T/ 10020' 9,962.0 10,020.0 1/31/2022 14:30 1/31/2022 18:30 4.00 PROD1, DRILL DRLG T Drilling for data F/ 10020 T/ 10400' 10,020.0 10,400.0 1/31/2022 18:30 1/31/2022 21:00 2.50 PROD1, DRILL TRIP T Pump 5 X 5 sweeps / POOH for OHAB // PU Wt. 37K // Jog below the build 2nd 5 X 5 exit the bit 10,400.0 70.0 1/31/2022 21:00 1/31/2022 22:30 1.50 PROD1, DRILL PULD T PJSM // Pressure Un-deploy bha # 13 lateral drilling assembly 70.0 0.0 1/31/2022 22:30 1/31/2022 22:45 0.25 PROD1, DRILL PULD T Blow down and lay down baker houghes inteq motor and NOV agitator 0.0 0.0 1/31/2022 22:45 2/1/2022 00:00 1.25 PROD1, DRILL PULD T Make up and pick up BOT WS 0.0 0.0 2/1/2022 00:00 2/1/2022 00:36 0.60 PROD1, DRILL PULD T Make up and pick up BOT WS 0.0 72.9 2/1/2022 00:36 2/1/2022 02:18 1.70 PROD1, DRILL TRIP T RIH with BHA #14. - OHAB. 72.9 8,500.0 2/1/2022 02:18 2/1/2022 02:30 0.20 PROD1, DRILL DLOG T Tie into the K1 for a -7' correction. Park, close EDC. PU Wt 32 klbs. 8,500.0 8,522.6 2/1/2022 02:30 2/1/2022 02:54 0.40 PROD1, DRILL TRIP T Continue to RIH to set depth, Window clean. Bit depth 8961.77, PU to 28 k lbs, Slips oriented 30 °ROHS. Online w pump - Tool sheared at 4,600 psi, WOB climed to 4 k lbs PU slightly, RIH and stack 3.2 k lbs on billet - Good set 8,522.6 8,961.8 2/1/2022 02:54 2/1/2022 04:24 1.50 PROD1, DRILL TRIP T PU Wt 33 klbs - Pull into cased hole, Park, open EDC POOH w OHAB setting assembly 8,961.8 72.9 2/1/2022 04:24 2/1/2022 06:06 1.70 PROD1, DRILL PULD T PUD BHA #14, OHAB setting assembly - Crew change 72.9 0.0 2/1/2022 06:06 2/1/2022 07:42 1.60 PROD1, DRILL PULD T PD BHA # 15 ERD lateral drilling asembly. 0.0 78.2 2/1/2022 07:42 2/1/2022 09:18 1.60 PROD1, DRILL TRIP T RIH W BHA #15 78.2 8,500.0 2/1/2022 09:18 2/1/2022 09:42 0.40 PROD1, DRILL DLOG T Tie into the K1 for a -7' correction. Trap pressure and observe. Pressure stabilized at 3776 psi - sensor depth 6038.9' 12.05 EMW 8,500.0 8,520.0 2/1/2022 09:42 2/1/2022 10:00 0.30 PROD1, DRILL TRIP T Continue in hole, window clean, dry tag TOB @ 8950' PU and set parameters - PU Wt 33 k lbs 8,520.0 8,950.0 2/1/2022 10:00 2/1/2022 14:00 4.00 PROD1, DRILL KOST T OA 11 psi, IA 0 psi, WH 440 psi, CT 4463 pis @ 1.84 bpm in and 1.76 bpm out. BHP 3899 psi, Fre spin 980 psi, Sneak up on billet, kiss it, grab a tenth every 6 minutes, x3 - engage auto drill at 1Ft/ hr. Increase ROP to 2 ft/hr At 8950.74' Stall at 8,953.42' PU and restart. drill to 5954.78 at 3 ft/hr, stall 5954.78'. Stall at 5954.98'. 8,949.7 8,970.0 2/1/2022 14:00 2/1/2022 16:48 2.80 PROD1, DRILL DRLG T OA 11, IA 0, WH 282 psi, CT 4796 psi @ 1.83 bpm, BHP 3864 psi, Free spin diff 1118 psi. RIH Wt CT 14.8 k lbs, OBD, CT Wt Pick ups 34 k lbs 8,970.0 9,544.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 11/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/1/2022 16:48 2/1/2022 17:06 0.30 PROD1, DRILL WPRT T PUH on wiper #1 9,544.0 8,930.0 2/1/2022 17:06 2/1/2022 17:24 0.30 PROD1, DRILL WPRT T Wiper back in hole, RIW 10-12k CTSW 8,930.0 9,544.0 2/1/2022 17:24 2/1/2022 20:36 3.20 PROD1, DRILL DRLG T BOBD, 1.83 bpm/4,691 psi, WHP 235, BHP 3,907, IA 114, OA 11 Looking for the top @ 92°, found the top due to slower ROP and Higher Gamma 9,770', Turn down going for 85°, leveling out and holding 90° Avg. ROP 145 fph 9,544.0 9,950.0 2/1/2022 20:36 2/1/2022 20:54 0.30 PROD1, DRILL WPRT T WIper up hole, PUW clean 38k CTSW, 9,950.0 9,150.0 2/1/2022 20:54 2/1/2022 21:18 0.40 PROD1, DRILL WPRT T WIper back in hole w/full rate, RIW 8- 10k CTSW *** Note: current Mud System DS 1.75%, prep pits for mud swap 9,150.0 9,950.0 2/1/2022 21:18 2/1/2022 23:06 1.80 PROD1, DRILL DRLG T BOBD, 1.83 bpm/4,753 psi, WHP 264, IA 136, OA 12 Line up and send new mud down hole *** Note: new mud at the bit 10,095', 22:36pm Drilling ahead 145 fph, negative CTSW - 4k. 1.8 k DHWOB 9,950.0 10,170.0 2/1/2022 23:06 2/1/2022 23:18 0.20 PROD1, DRILL WPRT T New mud all the way around, pull short BHA wiper to obtain new parameters, PUW 36k, 10,170.0 10,170.0 2/1/2022 23:18 2/2/2022 00:00 0.70 PROD1, DRILL DRLG T BOBD, 1.83 bpm/4,516 psi, WHP 388, BHP 3,936, IA 21, OA 19 10,170.0 10,268.0 2/2/2022 00:00 2/2/2022 00:39 0.65 PROD1, DRILL DRLG T OBD, 1.83 bpm/4,865 psi, WHP 360, BHP 3,963, IA 0, OA 19 140 bph, negative CTSW -4k, 1.5k DHWOB Dropping INC down to 88° 10,268.0 10,351.0 2/2/2022 00:39 2/2/2022 01:24 0.75 PROD1, DRILL WPRT T Wiper to the window for tie in, PUW 39lk Observed -2k CTSW traveling past billet 10,350.0 8,500.0 2/2/2022 01:24 2/2/2022 01:36 0.20 PROD1, DRILL DLOG T Log K1 marker for depth control, plus 6.0' 8,500.0 8,527.0 2/2/2022 01:36 2/2/2022 02:36 1.00 PROD1, DRILL WPRT T Wiper back in hole, clean through window and past billet Set down 9,640'-9,850', PUW 39k, lower pump rate to 0.6-1.0 bpm, pass by clean, continue IH 8,527.0 10,350.0 2/2/2022 02:36 2/2/2022 02:54 0.30 PROD1, DRILL DRLG T BOBD, 1.81 bpm/4,684 psi, WHP 367, BHP 3,955 psi, IA 49, OA 13 10,350.0 10,400.0 2/2/2022 02:54 2/2/2022 03:24 0.50 PROD1, DRILL DRLG P BOBD, 1.81 bpm/4,684 psi, WHP 367, BHP 3,955 psi, IA 49, OA 13 10,400.0 10,430.0 2/2/2022 03:24 2/2/2022 06:18 2.90 PROD1, DRILL DRLG P OBD, 1.81 bpm/4,741 psi, WHP 353, BHP 3,994, IA 57, OA 13 10,430.0 10,756.0 2/2/2022 06:18 2/2/2022 06:42 0.40 PROD1, DRILL WPRT P PU Wt 38 k lbs, PUH on 850' wiper #1 after window wiper -600 # wob tug at 10,075' 10,756.0 9,924.0 2/2/2022 06:42 2/2/2022 07:06 0.40 PROD1, DRILL WPRT P RBIH - 560 # WOB spike at 10,072' 9,924.0 10,756.0 2/2/2022 07:06 2/2/2022 07:24 0.30 PROD1, DRILL DRLG P OA 11 psi, IA 103 psi, WH 319 psiu, CT 4969 psi @ 1.81 bpm, BHP 4053 - 12.06 ppg EMW @ the window, 12.57 ppg @ the bit. Free spin 1,091 psi ( sweep was exiting), CT wT -2 k lbs, WOB 1.5 k lbs 10,756.0 10,880.0 2/2/2022 07:24 2/2/2022 08:12 0.80 PROD1, DRILL WPRT P PU - 37 k lbs, PUH to capture missed surveys - Geomagnetic storm causing interference. 10,756.0 10,880.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 12/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/2/2022 08:12 2/2/2022 08:54 0.70 PROD1, DRILL DRLG P CT RIH wt 7.6 k lbs, Free spin 1004 psi, OBD, CT Wt -4 k lbs, WOB 1.6 k lbs, holding 12.03 ppg at he window, 12.5 EMW at the bit. 10,880.0 10,975.0 2/2/2022 08:54 2/2/2022 09:18 0.40 PROD1, DRILL DRLG P PU Wt 37 k lbs, PUH on wiper to the swab. - slow roll at 45 ft/ min 10,975.0 9,852.0 2/2/2022 09:18 2/2/2022 10:30 1.20 PROD1, DRILL WPRT P Dragging heavy, pulling neg WOB, turn aropund, work pipe / modulate pump rate, max rate on ups troke, 0.9 blpm while RIH. Work up slowly throug trouble spot at 15 ft/min. Trouble spots 9.650 ' and 9,856-9,890'. Pull to 9550' clean running, turn around and RBIH to 9950' below trouble area. Stacked WOB to 1.5 k lbs @ 9,650 and 9,856 - 9,890'. PUH max pump rate, Pull heavy @ 9,633 neg WOB to from -6 k to 3.8 k lbs. 9,852.0 9,600.0 2/2/2022 10:30 2/2/2022 11:00 0.50 PROD1, DRILL WPRT P Continue out of hole dragging low side pumping 1.9 bpm, orient for billet - clean, orient for window - clean 9,852.0 9,600.0 2/2/2022 11:00 2/2/2022 13:12 2.20 PROD1, DRILL WPRT P POOH in tubing, 1.9 bpm, 9,600.0 83.0 2/2/2022 13:12 2/2/2022 15:00 1.80 PROD1, DRILL TRIP P Bump up, set counters, RBIH 83.0 8,495.0 2/2/2022 15:00 2/2/2022 15:24 0.40 PROD1, DRILL DLOG P Tie into the K1 for -5.5 ' correction. PU Wt 28 k lbs Park and monitor BHP. MD 8511.7 TVD 6033.47' Trap 3790 psi and observe pressure bleed steadily to 3781 psi 12.07 ppg EMW - round to 12.1 ppg request 12.3 KW 8,495.0 8,511.7 2/2/2022 15:24 2/2/2022 16:30 1.10 PROD1, DRILL TRIP P RIH to confirm TD Window clean, Set down on billet with no pump, PU pass clean with min rate. Continue in hole - Trouble spot clean. Tag TD at 10,977 8,511.7 10,977.0 2/2/2022 16:30 2/2/2022 18:54 2.40 PROD1, DRILL TRIP P PUH slowly waiting for LRP completion. 10,977.0 10,977.0 2/2/2022 18:54 2/2/2022 19:54 1.00 COMPZ1, CASING DISP P Pull to window circulating 12.3 ppg beaded LRP Paint TD EOP flag Yellow (9,337.84') 10,977.0 8,645.0 2/2/2022 19:54 2/2/2022 21:54 2.00 COMPZ1, CASING TRIP P Continue POOH displacing well to 12.3 ppg completion fluiid Paint WIndow EOP flag White (6,878.22') 8,645.0 78.2 2/2/2022 21:54 2/2/2022 22:24 0.50 COMPZ1, CASING OWFF P PJSM for LD Drilling Assembly, check well for flow No-Flow, *** Note: Static loss rate 0.6 bph, lost 38 bbls to formation while displacing to surface. 78.2 78.2 2/2/2022 22:24 2/2/2022 23:48 1.40 COMPZ1, CASING PULD P LD and Inspect drilling assembly BHA #15 78.2 0.0 2/2/2022 23:48 2/3/2022 00:00 0.20 COMPZ1, CASING PUTB P Prep RF for liner OPS KuparukField in Cold Weather Conditions for equipment and personnel. Send variance to Well Support for Off- loading Super Sucker Weather -36°, with 6 mph wind, WC -54° 0.0 0.0 2/3/2022 00:00 2/3/2022 00:42 0.70 COMPZ1, CASING PUTB P PJSM w/Rig Crew and NS Rep, finish prepping RF Perform inspection of traveling blocks (good) 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 13/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/3/2022 00:42 2/3/2022 05:00 4.30 COMPZ1, CASING PUTB P PU Tubing 54 jts of solid liner and non- ported bull nose *** Note: Kick while tripping drill 3.38 min, with new floor hands. Excellent mentoring and execution of safety drill. Perform Quick AAR 0.0 1,668.1 2/3/2022 05:00 2/3/2022 06:18 1.30 COMPZ1, CASING PULD P PU BHA # 16, liner running assembly 1,668.1 1,717.9 2/3/2022 06:18 2/3/2022 08:00 1.70 COMPZ1, CASING RUNL P Bump up, set counters, RIH pumping min rate down the coil. Tie into window flag -12.7' correction. PU Wt 36 k lbs, hanging WOB -3.5 klbs. CT RIH wt 15.6 k lbs. 1,717.9 8,511.8 2/3/2022 08:00 2/3/2022 09:18 1.30 COMPZ1, CASING RUNL P Continue to RIH, window and billet clean Set down once at 10.383' PU - continue in hole 8,511.8 10,971.6 2/3/2022 09:18 2/3/2022 11:42 2.40 COMPZ1, CASING TRIP P Pump online to 1.5 bpm, diff to 1025, PU Wt - 33 k lbs - liner dropped off. Park, reset depth, PUH, billet and window clean. Park and open EDC - POOH 100ft/ min 10,971.6 75.0 2/3/2022 11:42 2/3/2022 12:42 1.00 COMPZ1, CASING PULD P Park shallow PJSM while flow checking - Good. Unstab injector - inspect pipe. LD BHA #16 L1 running assembly. 75.0 0.0 2/3/2022 12:42 2/3/2022 13:48 1.10 PROD2, STK PULD P PU BHA # 17, ERD drilling asembly, fresh NOV agitator, 0.6° AKO motor, and RB HCC Dynamus bit. Check pack offs, replace. 0.0 78.2 2/3/2022 13:48 2/3/2022 15:24 1.60 PROD2, STK TRIP P RIH w BHA #17. 78.2 8,450.0 2/3/2022 15:24 2/3/2022 15:36 0.20 PROD2, STK DLOG P Tie into the K1 for a -3' correction, close EDC, PU Wt 32k lbs 8,450.0 8,506.0 2/3/2022 15:36 2/3/2022 16:00 0.40 PROD2, STK TRIP P Continue in hole, stacked out in window, picked up, passed clean, billet clean. Dry tag TOB @ 9306'. PU Wt 32 k lbs. 8,506.0 9,306.0 2/3/2022 16:00 2/3/2022 17:12 1.20 PROD2, STK DISP P Displace well to drilling fluid. RBIH. 9,306.0 9,305.9 2/3/2022 17:12 2/3/2022 19:12 2.00 PROD2, STK KOST P KO liner top billet, 9,305.9' 1.81 bpm/4,950 psi, WHP 374, BHP 3,933, IA 0. OA 19 1.83 bpm in/1.78 bpm out, 1' ft/hr 9,307', 2' ft/hr 9,308', 3' ft/hr 9,309' 9,305.9 9,308.9 2/3/2022 19:12 2/3/2022 21:27 2.25 PROD2, DRILL DRLG P Drill ahead 1.82 bpm/4,950 psi, WHP 374, BHP 3,933, IA 0, OA 19 Holding 95° INC looking for the A2 9,308.9 9,700.0 2/3/2022 21:27 2/3/2022 21:45 0.30 PROD2, DRILL WPRT P 800' wiper up hole, PUW 32 k 9,700.0 9,000.0 2/3/2022 21:45 2/3/2022 22:03 0.30 PROD2, DRILL WPRT P Wiper back in hole, RIW 11 k Dry drift billet (clean) 9,000.0 9,700.0 2/3/2022 22:03 2/3/2022 23:30 1.45 PROD2, DRILL DRLG P BOBD, 1.9 bpm/4,971 psi, WHP 266, IA 0, OA 20 9,700.0 10,013.0 2/3/2022 23:30 2/3/2022 23:42 0.20 PROD2, DRILL WPRT P 10,013', BHA wiper PUW 36 k, checking differential pressures (good) 10,013.0 10,013.0 2/3/2022 23:42 2/4/2022 00:00 0.30 PROD2, DRILL DRLG P BOBD, 1.9 bpm/5,363 psi, WHP 205, IA 0, OA 20 10,013.0 10,059.0 2/4/2022 00:00 2/4/2022 00:15 0.25 PROD2, DRILL DRLG P OBD, 1.9 bpm/5,363 psi, WHP 205, IA 0, OA 20 10,059.0 10,100.0 2/4/2022 00:15 2/4/2022 00:33 0.30 PROD2, DRILL WPRT P Wiper up to 9,348', 36 k CTSW 10,100.0 9,348.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 14/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/4/2022 00:33 2/4/2022 00:51 0.30 PROD2, DRILL WPRT P Wiper back in hole, RIW 7 k CTSW Clean wiper both ways 9,348.0 10,100.0 2/4/2022 00:51 2/4/2022 03:15 2.40 PROD2, DRILL DRLG P BOBD, 1.88 bpm/5,393 psi, WHP 283, BHP 3,971, IA 10, OA 17 10,100.0 10,500.0 2/4/2022 03:15 2/4/2022 04:09 0.90 PROD2, DRILL WPRT P Wiper to the window 37 k CTSW, clean pickup Pass billet #1 & #2, window clean 10,500.0 8,500.0 2/4/2022 04:09 2/4/2022 04:21 0.20 PROD2, DRILL DLOG P Log K1 marker for depth control, correction of + 6.0' PUW 31 k CTSW 8,500.0 8,523.0 2/4/2022 04:21 2/4/2022 05:15 0.90 PROD2, DRILL WPRT P Wiper back in hole, RIW 12 k CTSW 8,523.0 10,500.0 2/4/2022 05:15 2/4/2022 10:00 4.75 PROD2, DRILL DRLG P OA 20 psi, IA 84 psi, WH 319 psi, CT 5,290 psi, @ 1.85 bpm in 1.84 bpm out, BHP 3971, free spin diff 1,533 psi, CT Wt -4 k lbs, WOB 1.5 k lbs, 10,625' PU Wt 35 k lbs, PUH to grab missed survey. Swap mud, new mud at the bit - 10,734' all the way around 10,778' Town decision to extend TD to 11,100' 10,985' PU Wt 37 k lbs Drill ahead to 10987' Town called TD **TD 10,500.0 10,987.0 2/4/2022 10:00 2/4/2022 10:24 0.40 PROD2, DRILL WPRT P PU Wt 37 k lbs, Pump 10x10 TD sweeps, PU slow while sweeps pumped to bit. RBIH to bottom as sweeps exit. 10,987.0 10,987.0 2/4/2022 10:24 2/4/2022 11:54 1.50 PROD2, DRILL WPRT P PUH on swab wiper trip chasing sweeps to surface Dragging low side and PUH@ 40 ft/min. Billets and window clean 10,987.0 8,625.0 2/4/2022 11:54 2/4/2022 14:18 2.40 PROD2, DRILL WPRT P Continue to POOH in tubing to swab. Pump pressure increased to 6500 psi. Reduce rate from 1.8 bpm to 1.6 bpm, CT pressure climbed up to 6500 psi again. reduced rate. Park, down on the pump, Open EDC. Pressures normal POOH pumping 2 bpm pulling 75 ft/ min to swab. Preload coil trak 8,625.0 62.0 2/4/2022 14:18 2/4/2022 16:00 1.70 PROD2, DRILL PULD T PUD BHA #17, erd drilling assembly 62.0 0.0 2/4/2022 16:00 2/4/2022 17:48 1.80 PROD2, DRILL PULD T PUD BHA #17, ERD drilling assembly - new coil trak motor and bit. 0.0 62.6 2/4/2022 17:48 2/4/2022 19:21 1.55 PROD2, DRILL TRIP P RIH with BHA # 18, 62.6 8,500.0 2/4/2022 19:21 2/4/2022 19:33 0.20 PROD2, DRILL DLOG P Log K1 marker for depth control, correction -8.0' PUW 32 k CTSW 8,500.0 8,523.0 2/4/2022 19:33 2/4/2022 19:45 0.20 PROD2, DRILL TRIP P Continue IH 8,523.0 8,636.1 2/4/2022 19:45 2/4/2022 20:45 1.00 PROD2, DRILL CTOP P Obtain SBHP 6,126' TVD, Annular pressure 3,969 psi, ECD 12.46 ppg Discuss planforward with TT Order out Formate and Returns truck for completion fluid swap 8,636.1 8,636.1 2/4/2022 20:45 2/4/2022 22:03 1.30 PROD2, DRILL TRIP P RIH, through window and billets clean Set down 9,400', work pipe to pass Set down 10,645', work pipe, lower pump rate 0.3 bpm, speed 30 fpm to pass. 8,636.1 10,987.1 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 15/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/4/2022 22:03 2/4/2022 23:03 1.00 PROD2, DRILL TRIP T Confirm TD 10,987', recip pipe Wait on beaded LRP 8.7 ppg drilling mud. 10,987.1 10,987.1 2/4/2022 23:03 2/4/2022 23:21 0.30 PROD2, DRILL TRIP T RBIH, line up and start pumping beaded LRP into coil 10,987.1 10,987.1 2/4/2022 23:21 2/5/2022 00:00 0.65 PROD2, DRILL DISP P POOH, laying in beaded Drilling Mud 8.7 ppg LRP up to 9,150' 10,987.1 9,350.0 2/5/2022 00:00 2/5/2022 00:15 0.25 PROD2, DRILL DISP P Continue POOH laying in 8.77 ppg beaded LRP 9,350.0 9,150.0 2/5/2022 00:15 2/5/2022 06:39 6.40 PROD2, DRILL TRIP T Continue pulling into tubing, reciprocate pipe Wait on Fomate 9,150.0 8,405.0 2/5/2022 06:39 2/5/2022 07:00 0.35 PROD2, DRILL DISP P RIH while displacing coil to weighted liner running pill. Window and upper billet @ 8,950' both clean 8,405.0 9,150.0 2/5/2022 07:00 2/5/2022 07:12 0.20 PROD2, DRILL DISP P PUH while displacing open hole and tubing to 12.8 beaded liner running pill. - 22 bbl's total vol LRP Billet and window both clean 9,150.0 8,552.0 2/5/2022 07:12 2/5/2022 09:00 1.80 PROD2, DRILL DISP P Continue to POOH while displacing tubing with remaining LRP and KW * top of LRP @ 7230' * White flag 7262.26' 8,552.0 83.0 2/5/2022 09:00 2/5/2022 10:06 1.10 COMPZ2, CASING PULD P Park shallow, flow check while PJSM - good static losses 2.4 bph, Strip off and inspect pipe. Lay down BHA over a dead well. 83.0 0.0 2/5/2022 10:06 2/5/2022 10:36 0.50 COMPZ2, CASING BOPE P Function test BOPE - Good 0.0 0.0 2/5/2022 10:36 2/5/2022 11:12 0.60 COMPZ2, CASING RURD P Prep floor to run liner - PJSM 0.0 0.0 2/5/2022 11:12 2/5/2022 13:48 2.60 COMPZ2, CASING PUTB P PU L1-01 liner - 42 joints 2-3/8" ST-L slotted liner under a Baker shorty deployment sleeve with a non-ported bullnose on bottom. Liner length ( 1292.82', lower completion LOA 1294.06') 0.0 1,294.1 2/5/2022 13:48 2/5/2022 14:06 0.30 COMPZ2, CASING RURD P Clean and clear rig floor from picking up liner. 1,294.1 1,294.1 2/5/2022 14:06 2/5/2022 14:54 0.80 COMPZ2, CASING PULD P PU BHA # 19, liner running assembly, 1,294.1 1,338.0 2/5/2022 14:54 2/5/2022 16:36 1.70 COMPZ2, CASING RUNL P Bump up and set counters, RIH with Lower L1-01 completion. Tie into flag for -15' correction PU Wt 33 k lbs, WOB -3.45 1,338.0 8,537.9 2/5/2022 16:36 2/5/2022 17:24 0.80 COMPZ2, CASING RUNL P Continue to run in open hole with L1-01 liner Land at 10982.44' and + 2 feet past our flag for a + 2.5' correction. TD 10984.9' 8,537.9 10,984.9 2/5/2022 17:24 2/5/2022 17:48 0.40 COMPZ2, CASING TRIP P PUH, park, reset counters, PUH paint a window flag 10,984.9 10,984.9 2/5/2022 17:48 2/5/2022 18:30 0.70 COMPZ2, CASING TRIP P POOH, line up pumping across the top. 10,984.9 5,764.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 16/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/5/2022 18:30 2/5/2022 19:00 0.50 COMPZ2, CASING TRIP P Kick while tripping Drill, derrick man (new to position), needed to shut down charge pump to move fliuid, radio to drilller to shut down charge pump. Derrick man noticed fluid continuing to flow across shaker, after checking his line up and discussing with driller what could be going on and checking trip sheet 4 bbls gain, Park coil 5,764', trouble shoot. Flow died off to no flow eventually. Checked valve on riser (vac) confirmed well is dead,AAR discussed pumping across the top takes a while for the flow to deminish, and the fluid falling out of coil while pulling out of hole could mess with trip sheet volumes. Great Team work and good response to things not looking right in the pits. 5,764.0 5,764.0 2/5/2022 19:00 2/5/2022 20:12 1.20 COMPZ2, CASING TRIP P Continue POOH 5,764.0 44.2 2/5/2022 20:12 2/5/2022 20:42 0.50 COMPZ2, CASING OWFF P Stop close to surface, check well for flow, PJSM 44.2 44.2 2/5/2022 20:42 2/5/2022 20:54 0.20 COMPZ2, CASING CTOP P Unstab INJH, inspect coiled tubing above coil connector while tagging up. 44.2 0.0 2/5/2022 20:54 2/5/2022 21:09 0.25 COMPZ2, CASING PULD P LD & Inspect setting tools (good) 0.0 0.0 2/5/2022 21:09 2/5/2022 21:24 0.25 COMPZ2, CASING PUTB P Prep RF for LIner OPS, PSJM 0.0 0.0 2/5/2022 21:24 2/5/2022 23:30 2.10 COMPZ2, CASING PUTB P PU upper L1-01 liner section 30 joints of slotted liner, ported bullnose, and Liner Top Billet 0.0 954.2 2/5/2022 23:30 2/6/2022 00:00 0.50 COMPZ2, CASING PULD P PU BHI CoilTrak tools 954.2 999.3 2/6/2022 00:00 2/6/2022 00:00 COMPZ2, CASING RUNL P Stab INJH, tag up, reset counter depths 999.3 999.3 2/6/2022 00:00 2/6/2022 00:00 COMPZ2, CASING RUNL P RIH, w/upper L1-01 liner section w/30 jts of slotted liner, ported bullnose, and LTB 999.3 2/6/2022 00:00 2/6/2022 00:15 0.25 COMPZ2, CASING PULD P Stab INJH, tag up, reset counter depths 999.3 999.3 2/6/2022 00:15 2/6/2022 01:45 1.50 COMPZ2, CASING RUNL P RIH, w/upper L1-01 liner section w/30 jts of slotted liner, ported bullnose, and LTB 999.3 8,499.2 2/6/2022 01:45 2/6/2022 01:57 0.20 COMPZ2, CASING RUNL P Minus 15.6' Correction at Window Flag PUW 31 k CTSW 8,499.2 8,499.2 2/6/2022 01:57 2/6/2022 02:27 0.50 COMPZ2, CASING RUNL P RIH Pass through window clean 8,499.2 9,685.0 2/6/2022 02:27 2/6/2022 02:39 0.20 COMPZ2, CASING RUNL P 9,685', Set down 5 k DHWOB, PUW 38 k CTSW, DHOWB -9 k Bring pump online 1.25 bpm/879 psi diff PUW 30k CTSW, DHWOB -3 k Remove liner Length from counters, 9,685.0 8,738.8 2/6/2022 02:39 2/6/2022 03:57 1.30 COMPZ2, CASING TRIP P POOH 8,738.8 44.2 2/6/2022 03:57 2/6/2022 04:27 0.50 COMPZ2, CASING OWFF P Close to surface, check well for flow, PJSM 44.2 44.2 2/6/2022 04:27 2/6/2022 05:12 0.75 COMPZ2, CASING CTOP P Unstab INJH, inspect CT above coil connector ~20' (good), LD and inspect setting tools BHA #20 44.2 0.0 2/6/2022 05:12 2/6/2022 06:24 1.20 PROD3, STK PULD P PU/MU L1-02 Build Assembly, BHA #21 0.0 72.2 2/6/2022 06:24 2/6/2022 08:12 1.80 PROD3, STK TRIP P RIH while displacing coil to power pro 72.2 8,449.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 17/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/6/2022 08:12 2/6/2022 08:48 0.60 PROD3, STK DLOG P Tie in, drove past, had to pick up, relog, faked out by early peak. Tie in for -7.5' correction. Geology not 100% happy with tie in, RIH to Log RA tag. Start displacing KW at the same time start logging Ra tag. 0.5' difference. PUH into tubing. 8,449.0 8,684.0 2/6/2022 08:48 2/6/2022 09:36 0.80 PROD3, STK DISP P Displace K-formate with power pro drilling fluid Park, close EDC 8,684.0 8,584.0 2/6/2022 09:36 2/6/2022 10:06 0.50 PROD3, STK TRIP P RIH, window clean, saw 4.2 WOB spike at 8686'. coil connector near X nipple. dry tag billet8736', PU Wt 31 k lbs. PU and set rate. 8,584.0 8,736.0 2/6/2022 10:06 2/6/2022 12:30 2.40 PROD3, STK KOST P KO billet 300° LOHS. OA 19 psi, IA 0 psi, WH 505 psi, CT 4673 psi @ 1.83 bpm in, 1.73 bpm out, free spin 592 psi, BHP 4152 psi. CT RIH Wt 14.8 RIH, see motor work @ 8735.11' - CT Wt 15.5 k lbs, grab a tenth every 6 min x2 - engage auto @ 1'/hr bump up to 2' /hr @ 8736.15' , issue with setting drilled at 15'/hr then caught. bump to 3' / hr @ 9737.19' , 8,736.0 8,743.0 2/6/2022 12:30 2/6/2022 13:48 1.30 PROD3, DRILL DRLG P Drill ahead to Some slip stick with big bend, Kicked some 58° - 59° dog legs. * TD 8,862'. 8,743.0 8,862.0 2/6/2022 13:48 2/6/2022 16:00 2.20 PROD3, DRILL TRIP P PU Wt 30 k lbs Pull slow waiting for sweeps to clear the bit. RBIH, dry drift, PUH window clean. Park, open EDC, POOH pumping 2 bpm. 8,862.0 72.0 2/6/2022 16:00 2/6/2022 17:45 1.75 PROD3, DRILL PULD P PUD BHA #21 - build turn drilling assembly 72.0 0.0 2/6/2022 17:45 2/6/2022 20:00 2.25 PROD3, DRILL PULD P PJSM., PD L1-02 ERD Driilling Assembly, BHA #22, with 0.6° ako and agitator Stab INJH 0.0 78.2 2/6/2022 20:00 2/6/2022 22:00 2.00 PROD3, DRILL TRIP P Inspect pac-off, Tag up, reset counter depths, RIH 78.2 8,490.0 2/6/2022 22:00 2/6/2022 22:12 0.20 PROD3, DRILL DLOG P Log K1 marker for depth control, correction of -6.0' 8,490.0 8,526.0 2/6/2022 22:12 2/6/2022 22:30 0.30 PROD3, DRILL TRIP P Continue IH through window and past billet 8,526.0 8,862.0 2/6/2022 22:30 2/6/2022 22:48 0.30 PROD3, DRILL DRLG P OBD, 1.6 bpm/1,940 psi diff/5,600 pump 1.8 bpm/2,130 psi diff/6,050 psi pump Agitator Failure Confer with town team 8,862.0 8,874.0 2/6/2022 22:48 2/7/2022 00:00 1.20 PROD3, DRILL TRIP T POOH to swap out agitator (26 hrs total time) 8,874.0 2,332.0 2/7/2022 00:00 2/7/2022 00:30 0.50 PROD3, DRILL TRIP T Continue OOH 2,332.0 78.2 2/7/2022 00:30 2/7/2022 01:30 1.00 PROD3, DRILL PULD T At surface, PJSM, PUD BHA #22 78.2 40.1 2/7/2022 01:30 2/7/2022 03:30 2.00 PROD3, DRILL PULD T Sheave's are froze, man rider is froze 40.1 40.1 2/7/2022 03:30 2/7/2022 04:00 0.50 PROD3, DRILL PULD T Swap out agitator, MU new agitator and motor, mark scribe line 40.1 0.0 2/7/2022 04:00 2/7/2022 05:30 1.50 PROD3, DRILL PULD T Work to free PDL's and Man Rider Sheaves. 0.0 78.2 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 18/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/7/2022 05:30 2/7/2022 07:06 1.60 PROD3, DRILL PULD T PD BHA #23 - ERD drilling assembly, fresh agitator, motor and Dynamus. 0.0 78.2 2/7/2022 07:06 2/7/2022 08:42 1.60 PROD3, DRILL PULD T RIH 78.3 8,450.0 2/7/2022 08:42 2/7/2022 08:54 0.20 PROD3, DRILL PULD T Tie into the K1 for -7' correction, PU Wt, 31 k lbs 8,450.0 8,523.1 2/7/2022 08:54 2/7/2022 09:06 0.20 PROD3, DRILL TRIP T Continue in hole, window and billet clean. Set rate and gather parameters. OA 14 psi, IA 0 psi, WH 631 psi, CT 4861 psi at 1.83 bpm in, free spin 974 psi, BHP 4022 psi, RIH Wt 12.6 k lbs, 8,523.1 8,874.0 2/7/2022 09:06 2/7/2022 14:54 5.80 PROD3, DRILL DRLG T OBD, CT Wt 11 k lbs, WOB 2.5 k lbs, ROP 150-250 ft/hr 9,066' PU Wt 33 k lbs - 5x5 sweep 9,276' PU Wt 33 k lbs, - 5x5 sweep 9,553' PU Wt 33 k lbs, - 5x5 sweep ROP over interval - 117 ft/hr 8,874.0 9,553.0 2/7/2022 14:54 2/7/2022 15:09 0.25 PROD3, DRILL WPRT P PU on long wiper - 850' 9,553.0 8,870.0 2/7/2022 15:09 2/7/2022 15:27 0.30 PROD3, DRILL WPRT P RBIH 8,870.0 9,553.0 2/7/2022 15:27 2/7/2022 19:33 4.10 PROD3, DRILL DRLG P OA 17 psi, IA 0 psi, WH 403 psi, CT 4031 psi, free spin 1,065 psi, BHP 4086 psi, RIH WT 9.6 k lbs, OBD, CT Wt 2.8 k lbs, WOB 2 k lbs. 9,826' PU Wt 33 k lbs - 5x5 sweep 10,037 - PU 37 k lbs, 10,055' - PU 33 k lbs - chasing sweep 9,553.0 10,055.0 2/7/2022 19:33 2/7/2022 20:15 0.70 PROD3, DRILL DRLG P PUH on wiper to the window Slight tugs on CT wt and WOB @ 9,828' and 9,608', minor motor work at 9,492 amd 9,076' - hole clean, CT weight increased from 33 to 36 k lbs in the build, no motor work. window clean 10,055.0 8,621.0 2/7/2022 20:15 2/7/2022 20:33 0.30 PROD3, DRILL DRLG P Park, open EDC, pump 2.5 bpm, chasing bottoms up while pulling to logging depth. 8,621.0 8,448.0 2/7/2022 20:33 2/7/2022 20:45 0.20 PROD3, DRILL DLOG P Tie into the K1 for a +3' correction. 8,448.0 8,519.6 2/7/2022 20:45 2/7/2022 21:03 0.30 PROD3, DRILL DRLG P Complete circ of bottoms up, Park and close EDC. 8,605.5' MD 6,032.3' TVD Trapped 3,964 psi and watched it bleed to 3,903 psi in 5 minutes ** SBHP 12.47 ppg EMW and falling. 8,519.6 8,605.5 2/7/2022 21:03 2/7/2022 22:00 0.95 PROD3, DRILL TRIP P PU Wt 34 k lbs, RBIH to drill 0.65 bbls cuttings returned on the trip 8,605.5 10,055.0 2/7/2022 22:00 2/8/2022 00:00 2.00 PROD3, DRILL TRIP P OA 10 psi, IA 0 psi, WH 374 psi, CT 4917 psi @ 1.82 bpm, BHP 4161 psi, free spin 1,027 psi, CT 3 k lbs, WOB 2 k lbs. 10,055.0 10,332.0 2/8/2022 00:00 2/8/2022 01:30 1.50 PROD3, DRILL DRLG P OBD, 1.8 bpm/5,224 psi, WHP 371, BHP 4,181, IA 30. OA 17 10,332.0 10,450.0 2/8/2022 01:30 2/8/2022 02:06 0.60 PROD3, DRILL WPRT P 10,450', Wiper up hole chasing 5x5 sweep, PUW 34k CTSW 10,450.0 9,600.0 2/8/2022 02:06 2/8/2022 02:36 0.50 PROD3, DRILL WPRT P 9,600', Wiper back in hole, RIW 11 k CTSW 9,600.0 10,450.0 2/8/2022 02:36 2/8/2022 06:00 3.40 PROD3, DRILL DRLG P BOBD, 1.8 bpm/5,009 psi, WHP 455, BHP 4,245, IA 37, OA 0 10,450.0 10,833.0 2/8/2022 06:00 2/8/2022 06:12 0.20 PROD3, DRILL WPRT P BHA Wiper up hole, PUW 10,833.0 10,833.0 2/8/2022 06:12 2/8/2022 06:30 0.30 PROD3, DRILL DRLG P BOBD, 1.82 bpm/4,822 psi, WHP 357, BHP 4,223, IA 122, OA 0 10,833.0 10,900.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 19/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/8/2022 06:30 2/8/2022 06:48 0.30 PROD3, DRILL WPRT P 10,900', Wiper up hole PUW 33 k CTSW 10,900.0 10,000.0 2/8/2022 06:48 2/8/2022 07:06 0.30 PROD3, DRILL WPRT P Wiper back in hole, RIW 8 k CTSW 10,000.0 10,900.0 2/8/2022 07:06 2/8/2022 08:36 1.50 PROD3, DRILL DRLG P BOBD, 1.82 bpm/4,822 psi, WHP 357, BHP 4,223, IA 122, OA 0 10,900.0 11,050.0 2/8/2022 08:36 2/8/2022 09:36 1.00 PROD3, DRILL WPRT P Wiper to the window, PUW 35 k CTSW 11,050.0 8,450.0 2/8/2022 09:36 2/8/2022 10:12 0.60 PROD3, DRILL WPRT P Pull through window clean, circulate bottoms up, while PUH @ 5m fpm 8,450.0 8,450.0 2/8/2022 10:12 2/8/2022 10:24 0.20 PROD3, DRILL WPRT P RBIH 8,450.0 8,490.0 2/8/2022 10:24 2/8/2022 10:42 0.30 PROD3, DRILL DLOG P Log formation for depth control plus 6.0' PUW 32 k CTSW, Perform static check *** Note: Obtain 10 min static above window 12.447 ppg, 3,904 psi annular pressure, 6,037.6' TVD 8.9 ppg in MM/9.04 ppg out MM 8,490.0 8,523.0 2/8/2022 10:42 2/8/2022 11:27 0.75 PROD3, DRILL WPRT P Wiper back in hole, RIW 12 k CTSW 8,523.0 11,050.0 2/8/2022 11:27 2/8/2022 13:57 2.50 PROD3, DRILL DRLG P BOBD, 1.82 bpm/4,896 psi, WHP 288, BHP 4,229, IA 4, OA 0 11,050.0 11,350.0 2/8/2022 13:57 2/8/2022 14:06 0.15 PROD3, DRILL WPRT P 11,350' 200' Wiper up hole, PUW 40 k CTSW 11,350.0 11,150.0 2/8/2022 14:06 2/8/2022 14:15 0.15 PROD3, DRILL WPRT P 11,150', Wiper back in hole RIW 8 k CTSW 11,150.0 11,350.0 2/8/2022 14:15 2/8/2022 15:00 0.75 PROD3, DRILL DRLG P BOBD, 1.82 bpm/4,981 psi, WHP 423, BHP 4,280, IA 0, OA 0 11,350.0 11,457.0 2/8/2022 15:00 2/8/2022 15:12 0.20 PROD3, DRILL WPRT P Short Geo Wiper, PUW 32 k CTSW, RBIH 11,457.0 11,457.0 2/8/2022 15:12 2/8/2022 16:12 1.00 PROD3, DRILL DRLG P BOBD, 1.82 bpm/4,981 psi, WHP 423, BHP 4,280, IA 0, OA 0 11,457.0 11,565.0 2/8/2022 16:12 2/8/2022 16:30 0.30 PROD3, DRILL WPRT P 11,565', Wiper up hole PUW 34 k CTSW 11,565.0 10,750.0 2/8/2022 16:30 2/8/2022 16:54 0.40 PROD3, DRILL WPRT P 10,750', Wiper back in hole, chasing sweeps, RIW 7.5 k CTSW 10,750.0 11,565.0 2/8/2022 16:54 2/8/2022 18:54 2.00 PROD3, DRILL DRLG P BOBD, 1.82 bpm/4,981 psi, WHP 423, BHP 4,280, IA 0, OA 0 11,565.0 11,715.0 2/8/2022 18:54 2/8/2022 19:12 0.30 PROD3, DRILL DRLG P Reach plan TD @ 11715', pump 10 X 10 sweeps 11,715.0 11,715.0 2/8/2022 19:12 2/8/2022 22:12 3.00 PROD3, DRILL WPRT P Start wiper trip to swab, Jog below build @ 8850. Pump 10 X 10 window sweeps. Clean past billet @ 8736. Clean through window. Continue out, Jog @ 100' 11,715.0 78.3 2/8/2022 22:12 2/9/2022 00:00 1.80 PROD3, DRILL WPRT P RIH, Midnight depth 8490 78.3 8,490.0 2/9/2022 00:00 2/9/2022 00:06 0.10 PROD3, DRILL WPRT P Continue in well 8,490.0 8,528.0 2/9/2022 00:06 2/9/2022 00:12 0.10 PROD3, DRILL DLOG P Log K1 for -7' correction 8,528.0 8,420.8 2/9/2022 00:12 2/9/2022 00:54 0.70 PROD3, DRILL PRTS P Obtain SBHP. Sensor TVD 6048. Pressure stabilized @ 3903 PSI, EMW= 12.42PPG 8,420.8 8,630.0 2/9/2022 00:54 2/9/2022 02:48 1.90 PROD3, DRILL WPRT P Continue in hole to confirm TD. Clean through window. clean past billet. 1K bump @ 9325'. Very minor. Tag up @ 11718' confirmed TD. PUH 2 BBls until beaded 8.6 PPG Liner running pill exits nozzel. PUW=35K 8,630.0 11,718.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 20/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/9/2022 02:48 2/9/2022 03:48 1.00 PROD3, DRILL TRIP P POOH laying in 8.6 PPG liner running pill to 9000', PUW=34K, Pump 12.8 PPG liner pill followed with 12.8 PPG to surface. Pump EOP flags 9550 and 6400' 11,718.0 8,600.0 2/9/2022 03:48 2/9/2022 05:30 1.70 PROD3, DRILL TRIP P Continue POOH displacing well to completion fluid 8,600.0 78.2 2/9/2022 05:30 2/9/2022 06:00 0.50 PROD3, DRILL OWFF P Check well for flow, PJSM 78.2 78.2 2/9/2022 06:00 2/9/2022 07:30 1.50 PROD3, DRILL PULD P LD and inspect drilling assembly over a dead well Bit grade: 1-3-BT-A-X-I-CT-TD 78.2 0.0 2/9/2022 07:30 2/9/2022 08:30 1.00 COMPZ3, CASING PUTB P Prep RF for liner OPS 0.0 0.0 2/9/2022 08:30 2/9/2022 11:30 3.00 COMPZ3, CASING PUTB P PU L1-02 Liner assembly w/68 jts of slotted liner, non-ported Bullnose 0.0 2,118.5 2/9/2022 11:30 2/9/2022 12:12 0.70 COMPZ3, CASING PULD P PJSM, PU Liner running assembly BHA #24 2,118.5 2,162.7 2/9/2022 12:12 2/9/2022 14:12 2.00 COMPZ3, CASING RUNL P RIH, w/L1-02 Sloitted liner, 68 jts, non- ported bullnose, and LTB, BHA #24 2,162.7 8,562.0 2/9/2022 14:12 2/9/2022 15:42 1.50 COMPZ3, CASING RUNL P Correct depth at 6,400' EOP minus 14.0', continue IH Work liner down 10,780'-10,946'. 8,562.0 11,718.0 2/9/2022 15:42 2/9/2022 15:54 0.20 COMPZ3, CASING RUNL P Land liner, bring pump online 1.5 bpm/1,122 psi, PUW 41 k brake over to 32 k CTSW, DHWOB 6 k - 0 k. remove liner length from counters 11,718.0 9,599.5 2/9/2022 15:54 2/9/2022 17:48 1.90 COMPZ3, CASING TRIP P POOH 9,599.5 55.0 2/9/2022 17:48 2/9/2022 18:18 0.50 COMPZ3, CASING OWFF P Tag up. Perform no flow test - Good. 55.0 55.0 2/9/2022 18:18 2/9/2022 19:00 0.70 COMPZ3, CASING BHAH P Lay down BHA # 24 on dead well 55.0 0.0 2/9/2022 19:00 2/9/2022 20:00 1.00 PROD4, STK BHAH P Make up lateral drilling BHA # 26 to drill L1-03. Make up to coil and surface test - Good. Tag up and set counters 0.0 78.3 2/9/2022 20:00 2/9/2022 22:06 2.10 PROD4, STK TRIP P Trip in well, BHA #25 78.3 8,490.0 2/9/2022 22:06 2/9/2022 22:12 0.10 PROD4, STK DLOG P Tie into K1 for -1' 8,490.0 8,517.0 2/9/2022 22:12 2/9/2022 22:18 0.10 PROD4, STK TRIP P Continue in well 8,517.0 8,625.0 2/9/2022 22:18 2/9/2022 23:00 0.70 PROD4, STK DISP P Displace well to 8.6 PPG Pwr Pro 8,625.0 8,625.0 2/9/2022 23:00 2/9/2022 23:36 0.60 PROD4, STK TRIP P Close EDC trip in well, Stacked out in bottom of window, PUH roll pump. Shut down pump. Clean pass through window past billet 8,625.0 9,597.0 2/9/2022 23:36 2/9/2022 23:42 0.10 PROD4, STK MILL P Dry tag liner top billet @ 9597, PUH, PUW=32K. Bring pump online 1.8 BPM @ 5180 PSI FS 9,597.0 9,596.7 2/9/2022 23:42 2/10/2022 00:00 0.30 PROD4, STK MILL P Set down on billet, Start milling 1 FPH @ 9596.7, 30° LOHS Midnight depth 9596.9 9,596.7 9,596.9 2/10/2022 00:00 2/10/2022 00:42 0.70 PROD4, STK MILL P Continue milling off billet @ 1 FPH, 30° LOHS 9,596.9 9,597.7 2/10/2022 00:42 2/10/2022 01:12 0.50 PROD4, STK MILL P Go to 2 FPH, 1.8 BPM @ 5180 PSI FS, BHP=4087 PSSI, 30° LOHS 9,597.7 9,598.7 2/10/2022 01:12 2/10/2022 01:36 0.40 PROD4, DRILL MILL P Go to 3 FPH, 1.8 BPM @ 5180 PSI FS, BHP=4081. 30° LOHS 9,598.7 9,600.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 21/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/10/2022 01:36 2/10/2022 06:36 5.00 PROD4, DRILL DRLG P Drill ahead, 1.8 BPM @ 5180 PSI FS, BHP=4080 9,600.0 10,031.0 2/10/2022 06:36 2/10/2022 07:00 0.40 PROD4, DRILL WPRT P 10,031'. Wiper up hole to 9,200', PUW 36 k CTSW 10,031.0 9,200.0 2/10/2022 07:00 2/10/2022 07:18 0.30 PROD4, DRILL WPRT P Wiper back in hole RIW 9 k CTSW, dry drift past billet clean 9,200.0 10,031.0 2/10/2022 07:18 2/10/2022 10:18 3.00 PROD4, DRILL DRLG P BOBD, 1.83 bpm/4,945 psi, WHP 280, BHP 4,162, IA 0, OA 14 *** Note: Increase EDC's at the window 12.65 ppg 10,031.0 10,400.0 2/10/2022 10:18 2/10/2022 11:18 1.00 PROD4, DRILL WPRT P Wiper up hole to the window, PUW 35 k CTSW 10,400.0 8,500.0 2/10/2022 11:18 2/10/2022 11:30 0.20 PROD4, DRILL DLOG P Circulate bottoms up with EDC closed, Log K1 marker for depth control plus 5.0', RIH 8,500.0 8,630.4 2/10/2022 11:30 2/10/2022 11:48 0.30 PROD4, DRILL CTOP P Obtain 10 min static above window 8,630', *** Note: 12.378 ppg/3,929 psi AP/6,111.84' TVD/WHP 1000/8.8 out-9.0 -in 8,630.4 8,630.0 2/10/2022 11:48 2/10/2022 12:24 0.60 PROD4, DRILL WPRT P RBIH, through window, notice 4k drop in CTSW, continue to bottom 8,630.0 10,400.0 2/10/2022 12:24 2/10/2022 15:24 3.00 PROD4, DRILL DRLG P BOBD, 1.82 bpm/4,968 psi, WHP 418, BHP 4,232, IA 0, OA 14 10,400.0 10,624.0 2/10/2022 15:24 2/10/2022 17:48 2.40 PROD4, DRILL DRLG P BOBD, 1.81 bpm/5,195 psi, WHP 446, BHP 4,251, IA 17, OA 14 10,624.0 10,800.0 2/10/2022 17:48 2/10/2022 18:30 0.70 PROD4, DRILL WPRT P Wiper trip #1 800' up. PUW=35K Clean trip up and down 10,800.0 10,800.0 2/10/2022 18:30 2/10/2022 19:24 0.90 PROD4, DRILL DRLG P Drill ahead, 1.84 BPM @ 4810 PSI FS, BHP=4147 10,800.0 10,868.0 2/10/2022 19:24 2/10/2022 19:30 0.10 PROD4, DRILL WPRT P BHA wiper, stacking, PUW=41K 10,868.0 10,868.0 2/10/2022 19:30 2/10/2022 21:00 1.50 PROD4, DRILL DRLG P Drill, 1.86 BPM @ 5155 PSI FS, BHP=4238 10,868.0 10,990.0 2/10/2022 21:00 2/10/2022 21:06 0.10 PROD4, DRILL WPRT P Pick up, loosing diff pressure, PUW=41K 10,990.0 10,990.0 2/10/2022 21:06 2/11/2022 00:00 2.90 PROD4, DRILL DRLG P Drill, 1.82 BPM @ 5155 PSI FS, BHP=4251 10,990.0 11,147.0 2/11/2022 00:00 2/11/2022 00:42 0.70 PROD4, DRILL DRLG P Drill, 1.81 BPM @ 5155 PSI FS, BHP=4200 11,147.0 11,200.0 2/11/2022 00:42 2/11/2022 01:24 0.70 PROD4, DRILL WPRT P Wiper trip #2 800', PUW=34K 11,200.0 11,200.0 2/11/2022 01:24 2/11/2022 02:06 0.70 PROD4, DRILL DRLG P Drill, 1.82 BPM @ 5044 PSI FS, BHP=4381 11,200.0 11,250.0 2/11/2022 02:06 2/11/2022 02:12 0.10 PROD4, DRILL WPRT P BHA wiper, Stacked out, PUW=41K 11,250.0 11,250.0 2/11/2022 02:12 2/11/2022 03:42 1.50 PROD4, DRILL DRLG P Drill, 1.83 BPM @ 5070 PSI FS, BHP=4272 11,250.0 11,323.3 2/11/2022 03:42 2/11/2022 03:54 0.20 PROD4, DRILL WPRT P BHA wiper up hole, PUW 46 k CTSW 11,323.3 11,323.0 2/11/2022 03:54 2/11/2022 06:54 3.00 PROD4, DRILL DRLG P BOBD, 1.82 bpm/5,061 psi, WHP 236, BHP 4,280, IA 64, OA 14 11,323.0 11,642.0 2/11/2022 06:54 2/11/2022 07:06 0.20 PROD4, DRILL WPRT P BHA wiper up hole, PUW 40 k CTSW 11,642.0 11,642.0 2/11/2022 07:06 2/11/2022 08:36 1.50 PROD4, DRILL DRLG P BOBD, 1.82 bpm/5,061 psi, WHP 236, BHP 4,280, IA 64, OA 14 11,642.0 11,710.0 2/11/2022 08:36 2/11/2022 08:48 0.20 PROD4, DRILL WPRT P 11,710', TD Lateral, recip pipe for sweep to get to bit. 11,710.0 11,710.0 2/11/2022 08:48 2/11/2022 10:24 1.60 PROD4, DRILL WPRT P Wiper to window, PUW 40 k CTSW 11,710.0 8,650.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 22/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/11/2022 10:24 2/11/2022 12:54 2.50 PROD4, DRILL WPRT P Continue POOH to surface, pumping 1.9 bpm/4.764 psi, WHP 776, BHP 3,329, IA 44, OA 14 Perform jog back in hole 100' @ 1,500'; 8,650.0 78.2 2/11/2022 12:54 2/11/2022 14:36 1.70 PROD4, DRILL TRIP P At surface, reset counter depths, RBIH 78.2 8,490.0 2/11/2022 14:36 2/11/2022 14:48 0.20 PROD4, DRILL DLOG P Log the K1 marker for depth control, correction of - 7.0' Continue RIH to logging depth 8,490.0 8,523.0 2/11/2022 14:48 2/11/2022 15:12 0.40 PROD4, DRILL CTOP P 8,630', obtain Static Pressure survey above window 8,523.0 8,630.0 2/11/2022 15:12 2/11/2022 17:00 1.80 PROD4, DRILL TRIP P RIH, clean through window Bobble seen @ 9,960' 8,630.0 11,717.0 2/11/2022 17:00 2/11/2022 18:24 1.40 PROD4, DRILL CIRC P Recip pipe waiting on LRP 11,717.0 11,717.0 2/11/2022 18:24 2/11/2022 21:18 2.90 PROD4, DRILL TRIP P POOH pumping 12.5 PPG liner running pill followed with 12.5 completion fluid, Paint EOP flags @ 10,785 and 7600'. 11,717.0 75.0 2/11/2022 21:18 2/11/2022 21:48 0.50 PROD4, DRILL OWFF P At surface, Perform 30 min no flow test. PJSM to lay down drilling BHA 75.0 75.0 2/11/2022 21:48 2/11/2022 22:30 0.70 PROD4, DRILL BHAH P Unstab injuector. Inspect coil coming to stripper. Lay down BHA #25. Bit out @ 1 -2 75.0 0.0 2/11/2022 22:30 2/11/2022 23:30 1.00 COMPZ4, CASING RURD P Rig up floor to run liner. Inspect safety joint. PJSM liner running ops 0.0 0.0 2/11/2022 23:30 2/12/2022 00:00 0.50 COMPZ4, CASING PUTB P P/U L1-03 Lower liner segment with non ported bull nose, 29 Jts slotted 2 3/8" liner and QCLL receptical. 5 joints in at midnight 0.0 150.0 2/12/2022 00:00 2/12/2022 01:18 1.30 COMPZ4, CASING PUTB P Continue P/U L1-03 lower liner segment 150.0 885.0 2/12/2022 01:18 2/12/2022 02:00 0.70 COMPZ4, CASING BHAH P Tubing in well. Rig down floor from liner ops. Make up NS QCLL receptical to tubing, P/U coiltrak. Make up to copil and surface test 885.0 929.4 2/12/2022 02:00 2/12/2022 03:42 1.70 COMPZ4, CASING TRIP P RIH BHA #26 929.5 8,544.0 2/12/2022 03:42 2/12/2022 03:48 0.10 COMPZ4, CASING DLOG P Tie into flag for -16', PUW=32K 8,544.0 8,529.7 2/12/2022 03:48 2/12/2022 04:00 0.20 COMPZ4, CASING TRIP P Continue in well 8,529.7 9,350.0 2/12/2022 04:00 2/12/2022 04:06 0.10 COMPZ4, CASING DLOG P Log K1 for +8'. Make correction 9,350.0 9,385.0 2/12/2022 04:06 2/12/2022 05:30 1.40 COMPZ4, CASING TRIP P Continue in well, Set down @ 10,487. Work through, continue in.to setdown @ 10,660'. Work through 9,385.0 11,717.0 2/12/2022 05:30 2/12/2022 05:36 0.10 COMPZ4, CASING TRIP P Tag bottom, PUW=41K, DHWOB=-2.4. Set back down. Pumps on 1.5 BPM, PUW=31K, DHWOB=-.9 TOL=10,831 11,717.0 11,717.0 2/12/2022 05:36 2/12/2022 08:06 2.50 COMPZ4, CASING TRIP P POOH, Paint EOP flag @ 9,530' White Paint EOP flag @ 7,200' Yellow 11,717.0 44.3 2/12/2022 08:06 2/12/2022 08:36 0.50 COMPZ4, CASING OWFF P At surface, check well for flow, PJSM 44.3 44.3 2/12/2022 08:36 2/12/2022 09:06 0.50 COMPZ4, CASING PULD P LD setting tools over a dead well\ ** Valve Crew on location to service well head in prep for BOP testing 44.3 0.0 2/12/2022 09:06 2/12/2022 10:36 1.50 COMPZ4, CASING CTOP P Prep for BOP testing, grease choke manifold, tango valves, romeo valves, etc. 0.0 0.0 2/12/2022 10:36 2/12/2022 11:30 0.90 COMPZ4, CASING CTOP P Obtain shell test 5,000 psi 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 23/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/12/2022 11:30 2/12/2022 20:00 8.50 COMPZ4, CASING BOPE P Start BOPE testing, Low test pressure 250 psi/High test pressure 5,000 psi/Annular 2,500 psi. Wintess waived by AOGCC Guy Cook Test 1. Swab 2-Fail/Pass Test 2. Blind/Shear, BOP TV2, Charlie 4, 5, 8, &12 - Pass Test 3. BOP TV 1, Charlie 3, 7, & 11 - Pass Test 4. Manual choke D & Super choke C - Pass Test 5. Romeo 3, Bleeder 3, Tango 2, Charlie 2, & 10 - Pass Test 6. Charlie 1, 9, Bravo 5, and Tango 1 – install TIW test joint -Pass Test 7. Lower 2” pipe slip rams, TIW #1, Romeo 1, Bleeder 1 - Pass Test 8. Annular BOP 250/2500-Pass Test 9. Upper 2” pipe slip rams, Bravo 6, & 8-Pass Test 10. Bravo 7 – swap out 2” test joint for 2-3/8”-Pass Test 11. 2-3/8” pipe slip rams, TIW#2 – check N2 levels, swap to 2” test joint- Pass Test 12. Draw down accumulator-Pass Test 13. Stab injector and line up to reverse circulate coil, test inner reel valve and stripper. Tested all gas detectors, pits, cellar, Verified flow alarms - PVT Only fail pass was swab two. Recall grease crew and service valve 0.0 0.0 2/12/2022 20:00 2/12/2022 21:18 1.30 COMPZ4, CASING RURD P Rig down from BOPE test, Install floats in UQC. Prep floor for liner ops, Fill hole. 0.0 0.0 2/12/2022 21:18 2/13/2022 00:00 2.70 COMPZ4, CASING PUTB P PJSM, P/U L1-03 intermediate liner section, Disolvable bullnose, 41 Jts slotted liner, and NS QCLL 0.0 0.0 2/13/2022 00:00 2/13/2022 00:12 0.20 COMPZ4, CASING PUTB P Continue picking up L1-03 intermediate liner segment, Make up coiltrak to liner. Make up to coil and surface test 0.0 1,298.9 2/13/2022 00:12 2/13/2022 01:48 1.60 COMPZ4, CASING TRIP P RIH BHA # 27 1,298.9 8,510.0 2/13/2022 01:48 2/13/2022 01:54 0.10 COMPZ4, CASING DLOG P Correct to flag for -11', PUW=31K 8,510.0 8,499.0 2/13/2022 01:54 2/13/2022 02:18 0.40 COMPZ4, CASING TRIP P Continue in well, RIW=16K 8,499.0 9,720.0 2/13/2022 02:18 2/13/2022 02:24 0.10 COMPZ4, CASING DLOG P Log K1 for +3'. Continue in hole 9,720.0 9,731.0 2/13/2022 02:24 2/13/2022 02:42 0.30 COMPZ4, CASING TRIP P Continue in hole 9,731.0 10,750.0 2/13/2022 02:42 2/13/2022 02:48 0.10 COMPZ4, CASING TRIP P 10,750' Wt Chk, PUW=38. DHWOB=4.2K. Continue in to setdown @ 10,831. PUH to 40 K. DHWOB=-8K. Latched up. Bring pumjps online @ 1.5 BPM. PUW=30K, DHWOB=.7K, TOL=9577 10,750.0 10,831.0 2/13/2022 02:48 2/13/2022 04:18 1.50 COMPZ4, CASING TRIP P Remove liner length from counters, 1254.94', Trip out of hole, Paint flags @ 8633 and 7643.98 for 7500 and 8590' EOP 10,831.0 91.0 2/13/2022 04:18 2/13/2022 04:48 0.50 COMPZ4, CASING OWFF P At surface, perform 30 min no flow, PJSM lay down BHA on dead well 91.0 91.0 2/13/2022 04:48 2/13/2022 05:36 0.80 COMPZ4, CASING BHAH P Lay down BHA #27 liner running tools 91.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022 Page 24/24 3M-05 Report Printed: 2/24/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/13/2022 05:36 2/13/2022 06:36 1.00 COMPZ4, CASING PUTB P Prep RF for liner ops 0.0 0.0 2/13/2022 06:36 2/13/2022 08:36 2.00 COMPZ4, CASING PUTB P PU L1-03 Upper liner segment 0.0 939.3 2/13/2022 08:36 2/13/2022 09:36 1.00 COMPZ4, CASING BHAH P PU, BHI CoilTrak tools and NS setting tool 939.3 983.3 2/13/2022 09:36 2/13/2022 12:06 2.50 COMPZ4, CASING RUNL P Stab INJH, tag up, reset counters, RIH Correct to the flag - 8.0', PUW 33 k CTSW 983.3 9,410.0 2/13/2022 12:06 2/13/2022 12:18 0.20 COMPZ4, CASING DLOG P Log K1 marker for depth control correction of + 2.0' 9,410.0 9,439.0 2/13/2022 12:18 2/13/2022 12:30 0.20 COMPZ4, CASING RUNL P Continue IH 9,439.0 9,577.0 2/13/2022 12:30 2/13/2022 12:48 0.30 COMPZ4, CASING RUNL P 9,577', Set down 8 k CTSW, PUH 41 k CTSW to confirm lactched, set back down 8k, bring pump online 1.5 bpm/Diff 1,126 psi, PUH 29 k CTSW, 8,623' 9,577.0 8,637.3 2/13/2022 12:48 2/13/2022 13:18 0.50 DEMOB, WHDBOP WAIT P Vac trucks on location, spot after truck repair 8,637.3 8,623.0 2/13/2022 13:18 2/13/2022 14:18 1.00 DEMOB, WHDBOP DISP P Diplace well to SW 8,623.0 8,623.0 2/13/2022 14:18 2/13/2022 16:18 2.00 DEMOB, WHDBOP TRIP P POOH, LRS on location, PJSM, spot in, RU, PT 4,500 psi 8,623.0 2,600.0 2/13/2022 16:18 2/13/2022 18:12 1.90 DEMOB, WHDBOP FRZP P Freeze Protect well from 2,600', Tag up and space out 2,600.0 50.0 2/13/2022 18:12 2/13/2022 20:00 1.80 DEMOB, WHDBOP BHAH P On surface, Tag up. Space out PJSM. PUD BHA # 28 50.0 0.0 2/13/2022 20:00 2/13/2022 21:00 1.00 DEMOB, WHDBOP CTOP P Make up Swizzle stick, Stab on well. Jet stack / Flush rig 0.0 0.0 2/13/2022 21:00 2/14/2022 00:00 3.00 DEMOB, WHDBOP RURD Unstab, Blow down rig TT line. Disconnect from tiger tank and release to tool house. Replace UQC rehead E- line, Start RDMO Check list 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 2/14/2022            !"#$%&'#!$(%#!'&)#*+*,-'!'&(##-)#  .'& **#!%( / 01&'!$!)--#'')2#!'!3!(''%24 )4,/ 51      #-!%(!$-2#!'!66#'')!'!%!!$(,-($(% .'78 '!3+#'!*,!$4/95:5&;<9596(!%87 8$(%)(=%#-4 8 > '!!(!-&%#-4 8>3(%3 --$'' 2-475?$,3(''!($ $(% 3(%3 --&+$(%!(=5.**!(& %4!$3'/959676&2*$ ! #%!$(%#*,%)#$(%=!%(. **!(&3,%%3(!;$(%'!$!% --(/95967    ;+- --(3(%32!2*$ '!)*,&3+-!!('!$!%$$(2*$ '!)*, ! '&#)--%)!+-$(%)(% --!2-!(+-&%)#'-*,-( $(%$( 2-*,'&$(%*$-#   =   @=" A  7B0..C76.. .D8/959.  @ E  A7 ED8;8  ;75..  F/959. 780.  D959. B". @D;C &D8 8 959. CF=    A779 "..F=; D;8  /95BB. CD;87  D7  '!'$*+$%!"%--((!3, 0 B6B "   D('+%*$-#-%! (%!+$!332-32$*,)#3(%3G=-*,'!#(!& #*,%)#G=-*,('-*,-('!(%#!+&$('!*+*,!(')'!(G=-*,& %%3('-*,-()(!&  8>"3+#'!*,!$4&!/95BB&;<9556 #)! 8>03(%3 --78!(=B.**!(&%4!$3'/955B. '!$!% --(3(%3/955679.9559760 0   (!() --(3(%3D9559760.!95B7B7)*+'-3#''!+(G#*!%7 )-- 8('#*!(&*+$(% --$(% !='!$!% --(3(%3 6   (!() --(3(%3 95B7B.!95B07(!()!' )*+'-3 #''!+(G#*!%7 83 8>6('#*!($(%*()$!(7  8$! %(+!7 5    8>53!+)'% --$(%'!($ &8!(=5.**!(&'!$!% --(/95B"763!+(#''& 8$(%  8>5&$4%3($!$!$(% #*,)#3(%3 --(#)#$(%+42% --&  8>B8%(! =576. **!('!$!% --(/95B0767#''7($(#$(!-$(##$$!( *$ $-7 8$(%'!$!!  8>B7 B    #-!  8>B7 +!-& *$ $=3$!(-*!*$-*'' +!'+!7  8>9*$ $&8!)((!+3--!'+3$!&#) #% "22-'($!!8!*-7E%((3%($-! 7!)(3--!%--( -)%7 8$(%*$ $ 87  8>: $,F3+#'!*,'!!( $'' 2-478! %(+!%#!+B&5.7 9   (!()(+-!'!%#!+7!;$!9505.!$4(!%87 8&  8>:7  8> &3(%3 --($'' 2-4> 78$(%%4!$;9&505.7 --G!3(%3!9&56.2' --"76H/9&50:7".7  %8$ ( #$'''&%4%!=*-$(& 87  8> 7!'!$*,3+-!)((*-! '+3$!7'!((-($(%'!##!6,#'=%7+--!'!!66 #'=%7!$!  !'!=3!(''3$%24)'!(*$%=7 :   (!()!!'!  7 %)##I)*,$(%*)! .*--$!'#!$(% #!!%##&=+$%%*-#)--!'!!"6&('!$-- $,)##I)*,$(%#'') !'!!"6#'&#*,%)# 8> $(%#'')%#-4% 76?$, !3!+$! $%)'2!&!%(=B76.**!($(%%4!$%!+ ;/9567--G! 3(%3(BH$(%$!+-!9&5B.7 "=6 ) $4#$!(' "    %$ (#$'''/8&"&"&$(%74%!3(%3=-$(7$ 2!! 7 8*+$'('3#'7  8> &(%'!$3(%3 --( $'' 2-47!'!$*,$(%  8> &2)-%%--($'' 2-478!3(%3!(  ="76.**!(&3(%3*-$(%--2)-%!996#+ $'' 2-47 %--($'' 2-4&$!$!&75? !8 "2!78$(%%-- ! %(+!%#!+9&9:.7 "    (!()!%--$+$% 9&9:.!:&" 6.7 8(3#&-2)-%'*!(& 4($--4-%%-'!2**!7 8$(%%--$+$%! .& %*'( $%!#-)2$*,%--%$+$%%$!$! 0& 88 & #''))(%#-4%2+$ "-$!$-$'' 2-4& *,%)#$(%%#-4%2+$ 0 8     8&!C*,%8 --!/9&96.&%--%$+$%! &59.7 )%'3$#/ &:6.&# (3#'$(%#) #('3#'$'(%%7    (!()!%--$+$%  &59.! &"6.7 )---(3#!3(%3!(7 ;(%3$(%+-*-$((!#)!7!)-!8 :50=:96.*)!#) #$! $(%)((('#%'!#$''7(!()(+-$(%%--$+$%!3# &B65.&%--% $+$%!#-$((% &:B6.&# '3$23#$(%*-$(+-&2!$( 8  7 ##$(%$--(&*( % &:BB.&-$%(2$%% 7"## &%'#-$*%3--! * #-!(-)%3+- 8&$(%('#*!%%--($'' 2-4&2!$% = 7 # D-( 7 "   D('+###(D-( & )2(&8$(%-$'% '-!!%-( * #-!((%#!+& 8& ,*,%--($'' 2-4 8> B&8&*,% (# --!/:&"5.&%--%$+$%! &6:.&# (3#'$(%#) #( '3#'$'(%%7 0   (!()--($+$%  &6:.! &:9B.&# (3#'$(%#) #( '3#'$'(%% )--%'3$23#&$!')$*'3$##%)!%--($'' 2-4%)!$2( $-% #'')'& 8&-% %#!+*(!-&2!$(% 8 "&:5:#' 76##& *(%3!+!3(!$ &'3$##%)!* #-!(-)%! $! 79##& *(!()%8&*( % &:9B.&-$%(2$%% )#!:& 6.& 6   (!()-$4(( &3$!( $!&-$4( 79##2$%% )#!B&".& %--($'' 2-4&    )(*!(!'!7 )(-3-(' (!30J!' '-!!%-(&((=#!%2)--('&$(%'+!4%#-4 (!'-&-$'(2!! & 8&'!!(!-'$%$%3--&   = )##-(' (!3"J!' '-!!%-(&#!%2)--('&$(%(# --!&  8-$,!-' 5   !$28&83 = )##-(' (!&**!%!!+3(%3 -$= 67.&-$'-((2!! & 8&!!(!-'7  8> & )-%%--( $'' 2-478&!)(3--! 3 74!$ /9&B"5.7%!$*, 2--!$(%%--2)-%!)(!9&95.7 8  8> & %--($'' 2-4& $!$!&75? !$(%4($ )'2!78$(%%--!9&9B6.&#) #$(%%! ++& 8$!$!$-)@970:+'A&"". %(+!%#!+ B   (!()8&  8>&'3$#)!$!$!& --($'' 2-4 8>"& 8&- $!(%#!+*(!-&--+$% 9&9B6.!:&66".7 8(-( 3#!9&9B.&J)'!2-32)-%7 8$(%%--! &66.& )---(3#!3(%3 !(%#!+*(!-7$##'')$(% (!6 (72'% 8  705##;$(%$--(7 8$(%%--! %(+!%#!+ &"".7 9   ((!)%--($+$%$(%3#% &"".! &B 6..&3#'  &06.& &:.& &6.& &656.3*-$(7 (! 8 $23(%3 706##"&:0#'&87--!#-$(/ &B 6.7 ) #'3#'  '3$23#7 8%(+!%#!+90:((('3$2 3# :    #-!'3$23#!*( %/ &B 9.*-$(!#7$4(()(((#-- --3%3!+ 79 #-!(-)-%!')$*7 $(%)( =-(! B 9.7 #%--( 8>67#(7(= '#-$*3--2$*,!975  3 &4!$ --!/:6:B&!$! --(/:6:57B ## -$'-((2!! & (!()--($+$%  &6:.! &:9B.& 4 4 ### %--($'' 2-4&    )(*!(!'!7 )(-3-(' (!30J!'4 J '-!!%-(&((=#!%2)--('&$(%'+!4%#-4 (!'-&-$'(2!! & *( % &:9B.& Below this red line is the 3M-05L1-01 lateral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aker Hughes Drive Broussard, LA 70518, USA March 3, 2022 AOGCC Attention: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Alaska 99501-3539 Subject:Final Log Distribution for ConocoPhillips Alaska, Inc. 3M-05L1-01 Kuparuk River API #: 50-029-21706-61-00 Permit No: 221-108 Rig: CDR3 The final Coil deliverables were uploaded via https://copsftp.sharefile.com/ for the above well. Items delivered: Digital Las Data, Graphic Images CGM/PDF and Survey Files. Thank you. Signature of receiver & date received: Please return transmittal letter to: Jenny Jones Jenny.E.Jones@conocophillips.com A. Carolina Martinez Arelys.Martinez@bakerhughes.com 221-108 T36399 Meredith Guhl Digitally signed by Meredith Guhl Date: 2022.03.04 10:59:19 -09'00' Žƒ•ƒ‹Žƒ† ƒ• ‘•‡”˜ƒ–‹‘‘‹••‹‘ 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov   Ty Senden CTD/RWO Engineering Director ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510 Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 3M-05L1-01 ConocoPhillips Alaska, Inc. Permit to Drill Number: 221-108 Surface Location: 1204’ FNL, 1703’ FEL, SEC. 25, T13N, R8E, UM Bottomhole Location: 1953’ FSL, 162’ FWL, SEC. 29, T13N, R9E, UM Dear Mr. Senden: Enclosed is the approved application for the permit to drill the above referenced well. The permit is for a new wellbore segment of existing well Permit 187-025, API 50-029-21706-00- 00. Production should continue to be reported as a function of the original API number stated above. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,composite curves for well logs run must be submitted to the AOGCCwithin 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Jeremy M. Price Chair DATED this ___ day of December, 2021. Jeremy Price Digitally signed by Jeremy Price Date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y Samantha Carlisle at 8:56 pm, Dec 08, 2021 'LJLWDOO\VLJQHGE\57\OHU6HQGHQ '1&1 57\OHU6HQGHQ2 ,QWHUYHQWLRQDQG,QWHJULW\28 $.:HOOV( UW\OHUVHQGHQ#FRQRFRSKLOOLSVFRP& 86 5HDVRQ,DPWKHDXWKRURIWKLVGRFXPHQW /RFDWLRQ\RXUVLJQLQJORFDWLRQKHUH 'DWH  )R[LW3')(GLWRU9HUVLRQ 57\OHU6HQGHQ ; %23 WHVW SUHVVXUH WR  SVLJ $QQXODU WHVW SUHVVXUH WR  SVLJ ; ;  '/%  ; ; ; '65  $YDULDQFH WR  $$&  E LV JUDQWHG WR DOORZ WKH NLFNRII SRLQW WR EH DQ\ SRLQW DORQJ WKH SDUHQW ODWHUDO 97/  ; ; dts 12/20/21 12/20/21 Jeremy Price Digitally signed by Jeremy Price Date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¶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pplication for Permit to Drill Document  3DJHRI  'HFHPEHU    :HOO1DPHDQG&ODVVLILFDWLRQ (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b)) .................................................................................................................. 2 /RFDWLRQ6XPPDU\ (Requirements of 20 AAC 25.005(c)(2)) ................................................................................................................................................. 2 %ORZRXW3UHYHQWLRQ(TXLSPHQW,QIRUPDWLRQ (Requirements of 20 AAC 25.005 (c)(3)) ................................................................................................................................................ 2 'ULOOLQJ+D]DUGV,QIRUPDWLRQDQG5HVHUYRLU3UHVVXUH (Requirements of 20 AAC 25.005 (c)(4)) ................................................................................................................................................ 2 3URFHGXUHIRU&RQGXFWLQJ)RUPDWLRQ,QWHJULW\WHVWV (Requirements of 20 AAC 25.005(c)(5)) ................................................................................................................................................. 2 &DVLQJDQG&HPHQWLQJ3URJUDP (Requirements of 20 AAC 25.005(c)(6)) ................................................................................................................................................. 3 'LYHUWHU6\VWHP,QIRUPDWLRQ (Requirements of 20 AAC 25.005(c)(7)) ................................................................................................................................................. 3 'ULOOLQJ)OXLGV3URJUDP (Requirements of 20 AAC 25.005(c)(8)) ................................................................................................................................................. 3 $EQRUPDOO\3UHVVXUHG)RUPDWLRQ,QIRUPDWLRQ (Requirements of 20 AAC 25.005(c)(9)) ................................................................................................................................................. 4 6HLVPLF$QDO\VLV (Requirements of 20 AAC 25.005(c)(10)) ............................................................................................................................................... 4 6HDEHG&RQGLWLRQ$QDO\VLV (Requirements of 20 AAC 25.005(c)(11)) ............................................................................................................................................... 4 (YLGHQFHRI%RQGLQJ (Requirements of 20 AAC 25.005(c)(12)) ............................................................................................................................................... 4 3URSRVHG'ULOOLQJ3URJUDP (Requirements of 20 AAC 25.005(c)(13)) ............................................................................................................................................... 4 6XPPDU\RI2SHUDWLRQV /LQHU5XQQLQJ 'LVSRVDORI'ULOOLQJ0XGDQG&XWWLQJV (Requirements of 20 AAC 25.005(c)(14)) ............................................................................................................................................... 6 'LUHFWLRQDO3ODQVIRU,QWHQWLRQDOO\'HYLDWHG:HOOV (Requirements of 20 AAC 25.050(b)) ..................................................................................................................................................... 6 $WWDFKPHQWV $WWDFKPHQW'LUHFWLRQDO3ODQVIRU0/0/0/ 0/ODWHUDOV $WWDFKPHQW&XUUHQW:HOO6FKHPDWLFIRU* $WWDFKPHQW3URSRVHG:HOO6FKHPDWLFIRU0/0/0/ 0/ODWHUDOV   37'$SSOLFDWLRQ0/0/0/ 0/  3DJHRI  'HFHPEHU  :HOO1DPHDQG&ODVVLILFDWLRQ  (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b)) 7KHSURSRVHGODWHUDOVGHVFULEHGLQWKLVGRFXPHQWDUH0/0/0/ 0/$OO ODWHUDOVZLOOEHFODVVLILHGDV³Service´ZHOOV   /RFDWLRQ6XPPDU\  (Requirements of 20 AAC 25.005(c)(2)) 7KHVHODWHUDOVZLOOWDUJHWWKH$VDQGSDFNDJHLQWKH.XSDUXNUHVHUYRLU6HHDWWDFKHGIRUPIRUVXUIDFH DQGVXEVXUIDFHFRRUGLQDWHVRIWKH0/0/0/ 0/   %ORZRXW3UHYHQWLRQ(TXLSPHQW,QIRUPDWLRQ (Requirements of 20 AAC 25.005 (c)(3)) 3OHDVHUHIHUHQFHEORZRXWSUHYHQWLRQ %23 VFKHPDWLFVRQILOHZLWKWKH&RPPLVVLRQIRU1DERUV&'5$& %23HTXLSPHQWLVDVUHTXLUHGSHU$$&IRUWKUXWXELQJGULOOLQJRSHUDWLRQV    3LSHUDPVEOLQGUDPVDQGWKH&7SDFNRIIZLOOEHSUHVVXUHWHVWHGWRSVLDQGWRSVL8VLQJWKH PD[LPXPIRUPDWLRQSUHVVXUHLQWKHDUHDRISVLLQ0 LHSSJ(0: WKHPD[LPXP SRWHQWLDOVXUIDFHSUHVVXUHLQ0DVVXPLQJDJDVJUDGLHQWRISVLIWZRXOGEHSVL6HHWKH ³Drilling Hazards Information and Reservoir Pressure´VHFWLRQIRUPRUHGHWDLOV  7KHDQQXODUSUHYHQWHUZLOOEHWHVWHGWRSVLDQGSVL   'ULOOLQJ+D]DUGV,QIRUPDWLRQDQG5HVHUYRLU3UHVVXUH (Requirements of 20 AAC 25.005 (c)(4) Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a)) 7KHIRUPDWLRQSUHVVXUHLQ.580ZDVPHDVXUHGWREHSVLDW79' SSJ(0: RQ 7KHPD[LPXPGRZQKROHSUHVVXUHLQWKH0YLFLQLW\LVWRWKHVRXWKZHVWLQWKH03UHVVXUH ZDVPHDVXUHGWREHSVLDW79' 6:+3FRQYHUWHGWR%+3SSJ(0: RQ  Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) 7KHUHLVDSRVVLELOLW\RIHQFRXQWHULQJIUHHJDVZKLOHGULOOLQJWKH0ODWHUDOVGXHWRSUHYLRXVJDVLQMHFWLRQLQ WKHDUHD,IJDVLVGHWHFWHGLQWKHUHWXUQVWKHFRQWDPLQDWHGPXGFDQEHGLYHUWHGWRDVWRUDJHWDQNDZD\IURP WKHULJ Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c)) 7KHPDMRUH[SHFWHGULVNRIKROHSUREOHPVLQWKH0ODWHUDOVZLOOEHVKDOHLQVWDELOLW\DFURVVIDXOWV0DQDJHG SUHVVXUHGULOOLQJ 03' ZLOOEHXVHGWRUHGXFHWKHULVNRIVKDOHLQVWDELOLW\DVVRFLDWHGZLWKIDXOWFURVVLQJV   3URFHGXUHIRU&RQGXFWLQJ)RUPDWLRQ,QWHJULW\WHVWV (Requirements of 20 AAC 25.005(c)(5)) 7KH0ODWHUDOVZLOOEHGULOOHGXQGHU $$&IRUWKUXWXELQJGULOOLQJRSHUDWLRQVVRDIRUPDWLRQLQWHJULW\ WHVWLVQRWUHTXLUHG  37'$SSOLFDWLRQ0/0/0/ 0/  3DJHRI  'HFHPEHU  &DVLQJDQG&HPHQWLQJ3URJUDP (Requirements of 20 AAC 25.005(c)(6)) New Completion Details /DWHUDO1DPH/LQHU7RS 0' /LQHU%WP 0' /LQHU7RS 79'66 /LQHU%WP 79'66/LQHU'HWDLOV 0/¶ ¶ ¶ ¶ /67/VORWWHGOLQHU DOXPLQXPELOOHWRQWRS 0/ ¶ ¶ ¶ ¶ /67/VORWWHGOLQHU DOXPLQXPELOOHWRQWRS 0/ ¶ ¶ ¶ ¶ /67/VORWWHGOLQHU DOXPLQXPELOOHWRQWRS 0/¶ ¶ ¶ ¶ /67/VORWWHGOLQHU ZLWKVKRUW\GHSOR\PHQWVOHHYHRQWRS Existing Casing/Liner Information &DWHJRU\ 2' :HLJKW SSI *UDGH &RQQHFWLRQ 7RS0' %WP0' 7RS 79' %WP 79' %XUVW SVL &ROODSVH SVL &RQGXFWRU ´  + :HOGHG ¶ ¶ ¶ ¶   6XUIDFH ´  - %7& ¶ ¶ ¶ ¶   3URGXFWLRQ ´  - %7& ¶ ¶ ¶ ¶    'LYHUWHU6\VWHP,QIRUPDWLRQ Requirements of 20 AAC 25.005(c)(7) 1DERUV&'5$&ZLOOEHRSHUDWLQJXQGHU$$&IRUWKUXWXELQJGULOOLQJRSHUDWLRQV7KHUHIRUHD GLYHUWHUV\VWHPLVQRWUHTXLUHG   'ULOOLQJ)OXLGV3URJUDP (Requirements of 20 AAC 25.005(c)(8)) Diagram of Drilling System $GLDJUDPRIWKH1DERUV&'5$&PXGV\VWHPLVRQILOHZLWKWKH&RPPLVVLRQ  Description of Drilling Fluid System  :LQGRZPLOOLQJRSHUDWLRQV:DWHU%DVHG3RZHU9LVPLOOLQJIOXLG SSJ   'ULOOLQJRSHUDWLRQV:DWHUEDVHG3RZHU9LVPXG SSJ This mud weight will not hydrostatically overbalance the reservoir pressure, overbalanced conditions will be maintained using MPD practices described below.  &RPSOHWLRQRSHUDWLRQV7KHZHOOZLOOEHORDGHGZLWKaSSJ1D%UFRPSOHWLRQIOXLGLQRUGHUWR SURYLGHIRUPDWLRQRYHUEDODQFHDQGZHOOERUHVWDELOLW\ZKLOHUX QQLQJFRPSOHWLRQV Managed Pressure Drilling Practice 0DQDJHGSUHVVXUHGULOOLQJ 03' WHFKQLTXHVZLOOEHHPSOR\HGWRPDLQWDLQDFRQVWDQWRYHUEDODQFHGSUHVVXUHRQ WKHRSHQKROHIRUPDWLRQDQGSURPRWHZHOOERUHVWDELOLW\WKURXJKRXWWKHFRLOHGWXELQJGULOOLQJ &7' SURFHVV0XG ZHLJKWLVQRWLQPDQ\FDVHVWKHSULPDU\ZHOOFRQWUROEDUULHU7KLVLVVDWLVILHGZLWKWKHSVLUDWHGFRLOHG WXELQJSDFNRIIDQG03'FKRNH%23(HTXLSPHQWSURYLGHVWKHVHFRQGDU\ZHOOFRQWURODVGHWDLOHGLQVHFWLRQ ³%ORZRXW3UHYHQWLRQ(TXLSPHQW,QIRUPDWLRQ´ ,QWKH0ODWHUDOVZHZLOOWDUJHWDFRQVWDQW%+3RIaSSJ(0:DWWKHZLQGRZ7KHFRQVWDQW%+3WDUJHW ZLOOEHDGMXVWHGWKURXJKFKRNHSUHVVXUHDQGRUPXGZHLJKWLQFUHDVHVWRPDLQWDLQRYHUEDODQFHGFRQGLWLRQVLI LQFUHDVHGUHVHUYRLUSUHVVXUHLVHQFRXQWHUHG$GGLWLRQDOFKRNHSUHVVXUHRULQFUHDVHGPXGZHLJKWPD\DOVREH HPSOR\HGIRULPSURYHGERUHKROHVWDELOLW\$Q\FKDQJHRIFLUFXODWLQJIULFWLRQSUHVVXUHGXHWRFKDQJHLQSXPSUDWHV RUFKDQJHLQGHSWKRIFLUFXODWLRQZLOOEHRIIVHWZLWKEDFNSUHVVXUHDGMXVWPHQWV  ,QWKH0ODWHUDOVZHZLOOWDUJHWDFRQVWDQW%+3RIaSSJ(0:DWWKHZLQGRZ Managed Pressure Drilling Practice 0DQDJHGSUHVVXUHGULOOLQJ 03' WHFKQLTXHVZLOOEHHPSOR\HGWRPDLQWDLQDFRQVWDQWRYHUEDODQFHGSUHVVXUHRQJS J T S\S WKHRSHQKROHIRUPDWLRQDQGSURPRWHZHOOERUHVWDELOLW\WKURXJKRXWWKHFRLOHGWXELQJGULOOLQJ &7' SURFHVV0XGSS \J ZHLJKWLVQRWLQPDQ\FDVHVWKHSULPDU\ZHOOFRQWUROEDUULHU '/%  37'$SSOLFDWLRQ0/0/0/ 0/  3DJHRI  'HFHPEHU  3UHVVXUHDWWKH0:LQGRZ ¶0'¶79' 8VLQJ03' 3XPSV2Q ESP 3XPSV2II $VDQG)RUPDWLRQ3UHVVXUH SSJ  SVL SVL 0XG+\GURVWDWLF SSJ  SVL SVL $QQXODUIULFWLRQ LH(&'SVLIW  SVL SVL 0XG(&'&RPELQHG QRFKRNHSUHVVXUH  SVL RYHUEDODQFHGaSVL  SVL XQGHUEDODQFHGaSVL  7DUJHW%+3DW:LQGRZ SSJ  SVL SVL &KRNH3UHVVXUH5HTXLUHGWR0DLQWDLQ 7DUJHW%+3SVL SVL   $EQRUPDOO\3UHVVXUHG)RUPDWLRQ,QIRUPDWLRQ (Requirements of 20 AAC 25.005(c)(9)) 1$$SSOLFDWLRQLVQRWIRUDQH[SORUDWRU\RUVWUDWLJUDSKLFWHVWZHOO   6HLVPLF$QDO\VLV (Requirements of 20 AAC 25.005(c)(10)) 1$$SSOLFDWLRQLVQRWIRUDQH[SORUDWRU\RUVWUDWLJUDSKLFWHVWZHOO   6HDEHG&RQGLWLRQ$QDO\VLV (Requirements of 20 AAC 25.005(c)(11)) 1$$SSOLFDWLRQLVIRUDODQGEDVHGZHOO   (YLGHQFHRI%RQGLQJ (Requirements of 20 AAC 25.005(c)(12)) (YLGHQFHRIERQGLQJIRU&RQRFR3KLOOLSV$ODVND,QFLVRQILOHZLWKWKH&RPPLVVLRQ   3URSRVHG'ULOOLQJ3URJUDP Requirements of 20 AAC 25.005(c)(13 Summary of Operations .58ZHOO0LVD.XSDUXN$6DQGSURGXFHUHTXLSSHGZLWK´WXELQJDQG´SURGXFWLRQFDVLQJ0LV FXUUHQWO\EHLQJZRUNHGRYHUWRLQVWDOOD7DQGHP:HGJHWRIDFLOLWDWH&7'RSHUDWLRQV7KH&7'VLGHWUDFNZLOOXWLOL]H IRXUODWHUDOVWRWDUJHWWKH$VDQGVWRWKHQRUWKDQGVRXWKHDVWRI07KH0&7'ODWHUDOVZLOOLQFUHDVH$ VDQGUHVRXUFHUHFRYHU\DQGWKURXJKSXW  3ULRUWR&7'ULJXS(/LQHZLOOVHWDPHFKDQLFDOZKLSVWRFN LQQHUZHGJH LQVLGHWKH´WXELQJDWWKHSODQQHG NLFNRIISRLQWRI¶0'7KH0/ODWHUDOZLOOH[LWWKURXJKWKH´WXELQJDQG´FDVLQJDW¶0'DQG GULOOWRDSODQQHG7'DW¶0'WDUJHWLQJWKH$VDQGWRWKHVRXWKHDVW7KHODWHUDOZLOOEHFRPSOHWHGZLWK ´VORWWHGOLQHUIURP7'XSWR¶0'ZLWKDQDOXPLQXPELOOHWIRUNLFNLQJRII  7KH0/ODWHUDOZLOONLFNRIIDW¶0'DQGGULOOWRDSODQQHG7'RI¶0'WDUJHWLQJWKH$VDQGWR WKHVRXWKHDVW,WZLOOEHFRPSOHWHGZLWK´VORWWHGOLQHUIURP7'XSWR¶0'ZLWKDQDOXPLQXPELOOHWIRU NLFNLQJRII  7KH0/ODWHUDOZLOONLFNRIIDW¶0'DQGGULOOWRDSODQQHG7'RI¶0'WDUJHWLQJWKH$VDQGWR WKHQRUWK,WZLOOEHFRPSOHWHGZLWK´VORWWHGOLQHUIURP7'XSWR¶0'ZLWKDQDOXPLQXPELOOHWIRU NLFNLQJRII  7KH0/ODWHUDOZLOONLFNRIIDW¶0'DQGGULOOWRDSODQQHG7'RI¶0'WDUJHWLQJWKH$VDQGWR WKHQRUWK,WZLOOEHFRPSOHWHGZLWK´VORWWHGOLQHUIURP7'XSWRWRSRIZKLSVWRFN   37'$SSOLFDWLRQ0/0/0/ 0/  3DJHRI  'HFHPEHU &7''ULOODQG&RPSOHWH0/DWHUDOV  3UH&7':RUN SRVWFXUUHQW5:2LQVWDOOLQJ7DQGHP:HGJH    6OLFNOLQH%UXVKDQGIOXVKQLSSOHSURILOHVGXPP\ZKLSVWRFNGULIWVHWORFNPDQGUHO FKHFNVHWIRU LQQHUZHGJH  (/LQH/RJ*5 &&/VHWLQQHUZHGJH  3UHSVLWHIRU1DERUV&'5$&  5LJ:RUN   0,581DERUV&'5$&ULJXVLQJ´FRLOWXELQJ18´%23(WHVW   0//DWHUDO $VDQG6RXWKHDVW  D 0LOO´ZLQGRZDW¶0' E 'ULOO´ELFHQWHUODWHUDOWR7'RI¶0' F 5XQ´VORWWHGOLQHUZLWKDQDOXPLQXPELOOHWIURP7'XSWR¶0'   0//DWHUDO $VDQG6RXWKHDVW  D .LFNRIIRIWKHDOXPLQXPELOOHWDW¶0' E 'ULOO´ELFHQWHUODWHUDOWR7'RI¶0' F 5XQ´VORWWHGOLQHUZLWKDQDOXPLQXPELOOHWIURP7'XSWR¶0'   0//DWHUDO $VDQG1RUWK  D .LFNRIIRIWKHDOXPLQXPELOOHWDW¶0' E 'ULOO´ELFHQWHUODWHUDOWR7'RI¶0' F 5XQ´VORWWHGOLQHUZLWKDQDOXPLQXPELOOHWIURP7'XSWR¶0'   0//DWHUDO $VDQG1RUWK  D .LFNRIIRIWKHDOXPLQXPELOOHWDW¶0' E 'ULOO´ELFHQWHUODWHUDOWR7'RI¶0' F 5XQ´VORWWHGOLQHUZLWKGHSOR\PHQWVOHHYHIURP7'XSWR¶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iner Running 7KHODWHUDOZLOOEHGLVSODFHGWRDQRYHUEDODQFLQJIOXLGSULRUWRUXQQLQJOLQHU6HH³Drilling Fluids´VHFWLRQ IRUPRUHGHWDLOV :KLOHUXQQLQJ´VORWWHGOLQHUDMRLQWRI´QRQVORWWHGWXELQJZLOOEHVWDQGLQJE\IRU HPHUJHQF\GHSOR\PHQW$IORRUYDOYHLVPDGHXSRQWRWKLVMRLQWDKHDGRIWLPHDQGWKHULJFUHZ FRQGXFWVDGHSOR\PHQWGULOOZLWKWKLVHPHUJHQF\MRLQWRQHYHU\VORWWHGOLQHUUXQ7KH´UDPVZLOO SURYLGHVHFRQGDU\ZHOOFRQWUROZKLOHUXQQLQJ´OLQHU   'LVSRVDORI'ULOOLQJ0XGDQG&XWWLQJV Requirements of 20 AAC 25.005(c)(14 x 1RDQQXODULQMHFWLRQRQWKLVZHOO x $OOVROLGZDVWHZLOOEHWUDQVSRUWHGWRWKHJULQGDQGLQMHFWIDFLOLW\DW'63UXGKRH%D\IRUGLVSRVDO x ,QFLGHQWDOIOXLGVJHQHUDWHGIURPGULOOLQJRSHUDWLRQVZLOOEHLQMHFWHGLQD.XSDUXN&ODVV,,GLVSRVDOZHOO 5 RU%GLVSRVDOIDFLOLWLHV RU3UXGKRH'6LID.XSDUXNIDFLOLW\LVXQDYDLODEOH x $OOZDVWHVDQGZDVWHIOXLGVKDXOHGIURPWKHSDGPXVWEHSURSHUO\GRFXPHQWHGDQGPDQLIHVWHG x &RQWDFW.XSDUXN(QYLURQPHQWDO&RRUGLQDWRUIRUTXHVWLRQVUHJDUGLQJZDVWHFODVVLILFDWLRQ     'LUHFWLRQDO3ODQVIRU,QWHQWLRQDOO\'HYLDWHG:HOOV (Requirements of 20 AAC 25.050(b))  7KH$SSOLFDQWLVWKHRQO\DIIHFWHGRZQHU  3OHDVHVHH$WWDFKPHQW'LUHFWLRQDO3ODQV  0DJQHWLFDQGLQFOLQDWLRQVXUYH\VZLOOEHWDNHQHYHU\IW1RJ\URZLOOEHUXQ  0:'GLUHFWLRQDOUHVLVWLYLW\DQGJDPPDUD\ZLOOEHUXQRYHUWKHHQWLUHRSHQKROHVHFWLRQ  'LVWDQFHWR1HDUHVW3URSHUW\/LQH PHDVXUHGWR.3$ERXQGDU\DWFORVHVWSRLQW   /DWHUDO1DPH'LVWDQFH 0/¶ 0/¶ 0/¶ 0/¶  'LVWDQFHWR1HDUHVW:HOOZLWKLQ3RRO /DWHUDO1DPH'LVWDQFH:HOO 0/ ¶ ,/ 0/¶ ,/ 0/¶ 0 0/¶ 0    $WWDFKPHQWV Attachment 1: Directional Plans for 3M-05L1, 3M-05L1-01, 3M-05L1-02 & 3M-05L1-03 laterals Attachment 2: Current Well Schematic for 3M-05 Attachment 3: Proposed Well Schematic for 3M-05L1, 3M-05L1-01, 3M-05L1-02 & 3M-05L1-03 laterals  7UXH9HUWLFDO'HSWK XVIWLQ                9HUWLFDO6HFWLRQDWƒ XVIWLQ 0/70/70/ 70/70/700/ZS0/ ZS.237RSRI%LOOHW7'6(&7,21 '(7$,/66HF0' ,QF $]L 79'VV16(: 'OHJ 7)DFH96HFW                                                                        :(// '(7$,/6 016 (: 1RUWKLQJ (DVWLQJ /DWLWWXGH /RQJLWXGH    ƒ 1 ƒ :3URMHFW .XSDUXN5LYHU8QLWB6LWH .XSDUXN03DG:HOO 0:HOOERUH 0/3ODQ 0/ZS:(//%25('(7$,/6 0/3DUHQW :HOOERUH 0/7LHRQ0' $]LPXWKVWR7UXH1RUWK0DJQHWLF1RUWKƒ0DJQHWLF)LHOG6WUHQJWKQ7'LS$QJOHƒ'DWH0RGHO %**0706RXWK  1RUWK   XVIWLQ     :HVW  (DVW   XVIWLQ 0/70/70/ 70/70/3RO\JRQ0/7,/,/,/000/ZS1/3%0/ ZS.237RSRI%LOOHW7'5()(5(1&( ,1)250$7,21&RRUGLQDWH 1( 5HIHUHQFH :HOO07UXH1RUWK9HUWLFDO 79' 5HIHUHQFH 0HDQ6HD/HYHO6HFWLRQ 96 5HIHUHQFH 6ORW 1( 0HDVXUHG'HSWK5HIHUHQFH 0#XVIW 0 &DOFXODWLRQ 0HWKRG 0LQLPXP&XUYDWXUH0/ ZS0/ ZS Standard Planning Report 01 December, 2021 Plan: 3M-05L1-01 wp01 ConocoPhillips Alaska Inc_Kuparuk Kuparuk River Unit_2 Kuparuk 3M Pad 3M-05 3M-05L1-01 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: ConocoPhillips Alaska Inc_Kuparuk Kuparuk River Unit_2 Kuparuk 3M Pad Baker Hughes Planning Report Well: Wellbore: 3M-05 3M-05L1-01 Survey Calculation Method:Minimum Curvature Mean Sea Level Design:3M-05L1-01 wp01 Database:EDT 15 Alaska Prod MD Reference:3M-05 @ 63.00usft (3M-05) North Reference: Well 3M-05 True Map System: Geo Datum: Project Map Zone: System Datum:US State Plane 1983 North American Datum 1983 Kuparuk River Unit_2, North Slope Alaska, United States Alaska Zone 4 Mean Sea Level Using Well Reference Point Using geodetic scale factor Site Position: From: Site Latitude: Longitude: Position Uncertainty: Northing: Easting: Grid Convergence: Kuparuk 3M Pad usft Map usft usft °0.04Slot Radius:in0.000 6,015,953.75 1,646,158.55 0.00 70° 27' 18.721 N 149° 57' 11.307 W Well Well Position Longitude: Latitude: Easting: Northing: usft +E/-W +N/-S Position Uncertainty usft usft usftGround Level: 3M-05 usft usft 0.00 0.00 6,016,045.86 1,646,196.63 0.00Wellhead Elevation:usft0.00 70° 27' 19.627 N 149° 57' 10.186 W Wellbore Declination (°) Field Strength (nT) Sample Date Dip Angle (°) 3M-05L1-01 Model NameMagnetics BGGM2021 1/1/2022 15.32 80.77 57,307.99 Phase:Version: Audit Notes: Design 3M-05L1-01 wp01 PLAN Vertical Section: Depth From (TVD) (usft) +N/-S (usft) Direction (°) +E/-W (usft) Tie On Depth:9,200.00 135.000.000.00-26.80 Inclination (°) Azimuth (°) +E/-W (usft) TFO (°) +N/-S (usft) Measured Depth (usft) TVD Below System (usft) Dogleg Rate (°/100usft) Build Rate (°/100usft) Turn Rate (°/100usft) Plan Sections Target 0.000.000.000.005,910.38-955.746,139.49172.4387.399,200.00 -10.00-1.226.897.005,920.12-1,025.046,139.72171.5892.229,270.00 -110.00-4.70-1.725.005,959.50-1,200.476,137.61163.1289.139,450.00 -90.00-5.000.015.006,057.49-1,429.906,141.39150.6289.159,700.00 -80.00-4.930.865.006,347.57-1,770.046,132.76128.4593.0210,150.00 -100.00-4.92-0.895.006,603.71-1,924.316,123.90113.6890.3510,450.00 -90.00-5.000.005.006,792.93-1,988.296,122.70103.6890.3410,650.00 75.004.841.275.007,115.53-2,119.546,106.93120.6394.7911,000.00 12/1/2021 10:35:22AM COMPASS 5000.15 Build 91E Page 2 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: ConocoPhillips Alaska Inc_Kuparuk Kuparuk River Unit_2 Kuparuk 3M Pad Baker Hughes Planning Report Well: Wellbore: 3M-05 3M-05L1-01 Survey Calculation Method:Minimum Curvature Mean Sea Level Design:3M-05L1-01 wp01 Database:EDT 15 Alaska Prod MD Reference:3M-05 @ 63.00usft (3M-05) North Reference: Well 3M-05 True Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Vertical Section (usft) Dogleg Rate (°/100usft) +N/-S (usft) Planned Survey TVD Below System (usft) Map Northing (usft) Map Easting (usft) Toolface Azimuth (°) 9,200.00 87.39 172.43 6,139.49 4,855.08 0.00-955.74 5,910.38 6,015,094.80 1,652,107.160.00 KOP - Top of Billet 9,270.00 92.22 171.58 6,139.72 4,910.97 7.00-1,025.04 5,920.12 6,015,025.52 1,652,116.95-10.00 9,300.00 91.70 170.17 6,138.70 4,935.26 5.00-1,054.64 5,924.88 6,014,995.92 1,652,121.73-110.00 9,400.00 89.99 165.47 6,137.22 5,019.27 5.00-1,152.35 5,945.97 6,014,898.24 1,652,142.90-110.05 9,450.00 89.13 163.12 6,137.61 5,062.87 5.00-1,200.47 5,959.50 6,014,850.13 1,652,156.46-110.12 9,500.00 89.13 160.62 6,138.37 5,107.46 5.00-1,247.98 5,975.05 6,014,802.64 1,652,172.05-90.00 9,600.00 89.13 155.62 6,139.89 5,199.39 5.00-1,340.74 6,012.30 6,014,709.92 1,652,209.37-89.96 9,700.00 89.15 150.62 6,141.39 5,294.38 5.00-1,429.90 6,057.49 6,014,620.80 1,652,254.62-89.89 9,800.00 90.02 145.70 6,142.11 5,391.73 5.00-1,514.82 6,110.23 6,014,535.93 1,652,307.42-80.00 9,900.00 90.89 140.77 6,141.32 5,490.66 5.00-1,594.90 6,170.06 6,014,455.90 1,652,367.31-79.96 10,000.00 91.75 135.85 6,139.02 5,590.43 5.00-1,669.54 6,236.53 6,014,381.33 1,652,433.83-80.00 10,100.00 92.60 130.92 6,135.22 5,690.29 5.00-1,738.15 6,309.14 6,014,312.78 1,652,506.48-80.12 10,150.00 93.02 128.45 6,132.76 5,740.01 5.00-1,770.04 6,347.57 6,014,280.93 1,652,544.93-80.30 10,200.00 92.58 125.98 6,130.32 5,789.49 5.00-1,800.24 6,387.33 6,014,250.76 1,652,584.72-100.00 10,300.00 91.70 121.06 6,126.58 5,887.39 5.00-1,855.41 6,470.62 6,014,195.66 1,652,668.04-100.12 10,400.00 90.80 116.14 6,124.40 5,983.27 5.00-1,903.25 6,558.37 6,014,147.89 1,652,755.81-100.30 10,450.00 90.35 113.68 6,123.90 6,030.22 5.00-1,924.31 6,603.71 6,014,126.87 1,652,801.17-100.41 10,500.00 90.34 111.18 6,123.60 6,076.38 5.00-1,943.39 6,649.92 6,014,107.83 1,652,847.39-90.00 10,600.00 90.34 106.18 6,123.00 6,165.99 5.00-1,975.41 6,744.62 6,014,075.89 1,652,942.11-90.02 10,650.00 90.34 103.68 6,122.70 6,209.26 5.00-1,988.29 6,792.93 6,014,063.04 1,652,990.42-90.05 10,700.00 90.99 106.10 6,122.12 6,252.50 5.00-2,001.13 6,841.24 6,014,050.24 1,653,038.7475.00 10,800.00 92.27 110.93 6,119.28 6,341.94 5.00-2,032.86 6,936.00 6,014,018.58 1,653,133.5175.03 10,900.00 93.54 115.77 6,114.20 6,434.74 5.00-2,072.43 7,027.66 6,013,979.09 1,653,225.1975.17 11,000.00 94.79 120.63 6,106.93 6,530.18 5.00-2,119.54 7,115.53 6,013,932.05 1,653,313.0975.41 TD 12/1/2021 10:35:22AM COMPASS 5000.15 Build 91E Page 3 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: ConocoPhillips Alaska Inc_Kuparuk Kuparuk River Unit_2 Kuparuk 3M Pad Baker Hughes Planning Report Well: Wellbore: 3M-05 3M-05L1-01 Survey Calculation Method:Minimum Curvature Mean Sea Level Design:3M-05L1-01 wp01 Database:EDT 15 Alaska Prod MD Reference:3M-05 @ 63.00usft (3M-05) North Reference: Well 3M-05 True Target Name - hit/miss target - Shape TVD (usft) Northing (usft) Easting (usft) +N/-S (usft) +E/-W (usft) Targets LongitudeLatitude Dip Angle (°) Dip Dir. (°) 3M-05L1-01 T4 6,124.00 6,013,995.00 1,652,968.00-2,056.32 6,770.45 0.00 0.00 70° 26' 59.373 N 149° 53' 51.347 W - plan misses target center by 71.45usft at 10645.81usft MD (6122.73 TVD, -1987.29 N, 6788.86 E) - Point 3M-05L1-01 Polygon 0.00 6,015,517.00 1,652,121.00-533.51 5,924.55 0.00 0.00 70° 27' 14.357 N 149° 54' 16.154 W - plan misses target center by 6154.00usft at 9200.00usft MD (6139.49 TVD, -955.74 N, 5910.38 E) - Polygon 0.00Point 1 6,015,517.00 1,652,121.000.00 0.00 -584.18Point 2 6,014,933.00 1,652,283.000.00 161.56 -823.39Point 3 6,014,694.00 1,652,512.000.00 390.40 -1,000.51Point 4 6,014,517.00 1,652,648.000.00 526.28 -1,141.67Point 5 6,014,376.00 1,652,840.000.00 718.19 -1,308.99Point 6 6,014,209.00 1,653,226.000.00 1,104.10 -1,496.21Point 7 6,014,022.00 1,653,491.000.00 1,368.98 -1,762.08Point 8 6,013,756.00 1,653,283.000.00 1,160.75 -1,594.88Point 9 6,013,923.00 1,653,054.000.00 931.86 -1,448.56Point 10 6,014,069.00 1,652,653.000.00 530.93 -1,256.33Point 11 6,014,261.00 1,652,382.000.00 260.05 -1,026.18Point 12 6,014,491.00 1,652,215.000.00 93.21 -692.95Point 13 6,014,824.00 1,651,965.000.00 -156.55 -176.79Point 14 6,015,340.00 1,651,830.000.00 -291.17 3M-05L1-01 T3 6,133.00 6,014,249.00 1,652,489.00-1,801.92 6,291.60 0.00 0.00 70° 27' 1.879 N 149° 54' 5.404 W - plan misses target center by 60.01usft at 10127.31usft MD (6133.92 TVD, -1755.77 N, 6329.95 E) - Point 3M-05L1-01 T1 6,141.00 6,015,061.00 1,652,111.00-989.55 5,914.20 0.00 0.00 70° 27' 9.872 N 149° 54' 16.469 W - plan misses target center by 1.04usft at 9234.03usft MD (6140.34 TVD, -989.44 N, 5914.99 E) - Point 3M-05L1-01 T5 6,107.00 6,013,890.00 1,653,267.00-2,161.56 7,069.40 0.00 0.00 70° 26' 58.335 N 149° 53' 42.570 W - plan misses target center by 59.54usft at 10979.24usft MD (6108.62 TVD, -2109.16 N, 7097.64 E) - Point 3M-05L1-01 T2 6,142.00 6,014,613.00 1,652,213.00-1,437.67 6,015.86 0.00 0.00 70° 27' 5.464 N 149° 54' 13.494 W - plan misses target center by 40.20usft at 9688.12usft MD (6141.21 TVD, -1419.52 N, 6051.72 E) - Point Vertical Depth (usft) Measured Depth (usft) Casing Diameter (in) Hole Diameter (in)Name Casing Points 2 3/8"6,106.9311,000.00 2.375 3.500 Measured Depth (usft) Vertical Depth (usft) +E/-W (usft) +N/-S (usft) Local Coordinates Comment Plan Annotations 9,200.00 6,139.49 -955.74 5,910.38 KOP - Top of Billet 11,000.00 6,106.93 -2,119.54 7,115.53 TD 12/1/2021 10:35:22AM COMPASS 5000.15 Build 91E Page 4 Baker Hughes Anticollision Summary Report Well 3M-05Local Co-ordinate Reference:ConocoPhillips Alaska Inc_KuparukCompany: Mean Sea LevelTVD Reference:Kuparuk River Unit_2Project: 3M-05 @ 63.00usft (3M-05)MD Reference:Kuparuk 3M PadReference Site: TrueNorth Reference:0.00 usftSite Error: Minimum CurvatureSurvey Calculation Method:3M-05Reference Well: Output errors are at 2.00 sigmaWell Error:0.00 usft Reference Wellbore 3M-05L1-01 Database:EDT 15 Alaska Prod Offset DatumReference Design:3M-05L1-01 wp01 Offset TVD Reference: Interpolation Method: Depth Range: Reference Error Model: Scan Method: Error Surface: Filter type: ISCWSA Trav. Cylinder North Combined Pedal Curve GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference MD Interval 25.00usft 9,200.00 to 11,000.00usft Maximum ellipse separation of 3,000.00usft 3M-05L1-01 wp01 Results Limited by: SigmaWarning Levels Evaluated at: 2.79 Added to Error ValuesCasing Method: From (usft) Survey Tool Program DescriptionTool NameSurvey (Wellbore) To (usft) Date 12/1/2021 GCT-MS Schlumberger GCT multishot100.00 8,600.00 3M-05 (3M-05) MWD OWSG OWSG MWD - Standard8,600.00 9,200.00 3M-05L1 wp02 (3M-05L1) MWD OWSG OWSG MWD - Standard9,200.00 11,000.00 3M-05L1-01 wp01 (3M-05L1-01) Offset Well - Wellbore - Design Reference Measured Depth (usft) Offset Measured Depth (usft) Between Centres (usft) Between Ellipses (usft) Separation Factor Warning Summary Site Name Distance Kuparuk 3I Pad Normal Operations, CC, ES, 3I-01 - 3I-01L1-03 - 3I-01L1-03 10,565.95 12,090.00 548.12 337.47 2.602 Normal Operations, CC, ES, 3I-01 - 3I-01L1-04 - 3I-01L1-04 10,438.88 12,133.00 557.41 347.39 2.654 Normal Operations, CC, ES, 3I-01 - 3I-01L1-05 - 3I-01L1-05 10,658.11 12,066.00 572.91 360.86 2.702 Kuparuk 3M Pad 3M-01 - 3M-01 - 3M-01 Out of range CC, ES, SF3M-02 - 3M-02 - 3M-02 9,739.93 8,486.00 2,444.61 2,261.31 13.337 3M-03 - 3M-03 - 3M-03 Out of range 3M-03 - 3M-03A - 3M-03A Out of range 3M-03 - 3M-03APB1 - 3M-03APB1 Out of range CC3M-04 - 3M-04 - 3M-04 10,429.25 9,625.00 778.21 538.44 3.246 ES, SF3M-04 - 3M-04 - 3M-04 10,450.00 9,650.00 778.63 538.24 3.239 CC3M-05 - 3M-05L1 - 3M-05L1 wp02 9,518.98 9,525.00 38.34 33.24 7.518 Normal Operations, ES, SF3M-05 - 3M-05L1 - 3M-05L1 wp02 10,957.18 11,000.00 108.00 28.43 1.357 3M-07 - 3M-07 - 3M-07 Out of range 3M-08 - 3M-08 - 3M-08 Out of range 3M-21 - 3M-21 - 3M-21 Out of range 3M-22 - 3M-22 - 3M-22 Out of range 3M-24 - 3M-24L1 - 3M-24L1 Out of range 3M-24 - 3M-24L1-01 - 3M-24L1-01 Out of range 3M-24 - 3M-24L1-01PB1 - 3M-24L1-01PB1 Out of range 3M-24 - 3M-24L1-02 - 3M-24L1-02 Out of range 3M-24 - 3M-24L1PB2 - 3M-24L1PB2 Out of range 3M-24 - 3M-24L1PB3 - 3M-24L1PB3 Out of range 3M-28 - 3M-28 - 3M-28 Out of range 3M-29 - 3M-29 - 3M-29 Out of range 3M-29 - 3M-29A - 3M-29A Out of range 3M-29 - 3M-29APB1 - 3M-29APB1 Out of range 12/1/2021 10:36:42AM COMPASS 5000.15 Build 91E CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation Page 2 Baker Hughes Anticollision Summary Report Well 3M-05Local Co-ordinate Reference:ConocoPhillips Alaska Inc_KuparukCompany: Mean Sea LevelTVD Reference:Kuparuk River Unit_2Project: 3M-05 @ 63.00usft (3M-05)MD Reference:Kuparuk 3M PadReference Site: TrueNorth Reference:0.00 usftSite Error: Minimum CurvatureSurvey Calculation Method:3M-05Reference Well: Output errors are at 2.00 sigmaWell Error:0.00 usft Reference Wellbore 3M-05L1-01 Database:EDT 15 Alaska Prod Offset DatumReference Design:3M-05L1-01 wp01 Offset TVD Reference: Offset Well - Wellbore - Design Reference Measured Depth (usft) Offset Measured Depth (usft) Between Centres (usft) Between Ellipses (usft) Separation Factor Warning Summary Site Name Distance Kuparuk 3N Pad CC, ES, SF3N-05 - 3N-05L1 - 3N-05L1 11,000.00 9,925.00 1,745.95 1,516.36 7.605 CC, ES, SF3N-05 - 3N-05L1PB1 - 3N-05L1PB1 11,000.00 9,775.00 1,542.46 1,304.50 6.482 12/1/2021 10:36:42AM COMPASS 5000.15 Build 91E CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation Page 3 3URMHFW .XSDUXN5LYHU8QLWB6LWH .XSDUXN03DG:HOO 0:HOOERUH 0/3ODQ 0/ZS:(//%25('(7$,/6 0/3DUHQW :HOOERUH 07LHRQ0' $]LPXWKVWR7UXH1RUWK0DJQHWLF1RUWKƒ0DJQHWLF)LHOG6WUHQJWKQ7'LS$QJOHƒ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«  :W/HQ O«  *UDGH + 7RS7KUHDG :(/'(' &DVLQJ'HVFULSWLRQ 685)$&( 2' LQ  ,' LQ  7RS IW.%  6HW'HSWK IW.%  6HW'HSWK 79' «  :W/HQ O«  *UDGH - 7RS7KUHDG %7& &DVLQJ'HVFULSWLRQ 352'8&7,21 2' LQ  ,' LQ  7RS IW.%  6HW'HSWK IW.%  6HW'HSWK 79' «  :W/HQ O«  *UDGH - 7RS7KUHDG %7& 7XELQJ6WULQJV 7XELQJ'HVFULSWLRQ 78%,1* 6WULQJ0D«  ,' LQ  7RS IW.%  6HW'HSWK IW«  6HW'HSWK 79'  «  :W OEIW  *UDGH / 7RS&RQQHFWLRQ $%0(8( &RPSOHWLRQ'HWDLOV 7RS IW.% 7RS 79'  IW.% 7RS,QFO ƒ ,WHP'HV 1RPLQDO,' LQ 0DNH 0RGHO 2'1RPLQDO LQ    +$1*(5  9(7&2 *5$<     6$)(7<9/9  2WLV )0;     3%5  &DPFR 2(-     3$&.(5  &DPFR +5363     1,33/(  &DPFR '     626  %DNHU  2WKHU,Q+ROH :LUHOLQHUHWULHYDEOHSOXJVYDOYHVSXPSVILVKHWF 7RS IW.% 7RS 79'  IW.% 7RS,QFO ƒ 'HV &RP 5XQ'DWH ,' LQ 61    ,626/((9( 6HWKROGRSHQVOHHYHLQ6669 [  ,'2$/       &87 &KHP&XW      &$7&+(5 &DWFKHU 2$/ 6HWRQ3OXJ      78%,1*3/8* &$3OXJ 2$/     ),6+ */9(PSW\3RFNHW)HOOGRZQKROH        ),6+ 29(PSW\3RFNHW)HOOWR5DWKROH     0DQGUHOV 7RS IW.% 7RS 79'  IW.% 7RS,QFO ƒ ,WHP'HV 1RPLQDO,' LQ 0DNH 0RGHO 2'1RPLQDO LQ    *$6/,)7  00+ )0+2     *$6/,)7  00+ )0+2     *$6/,)7  00+ )0+2     *$6/,)7  00+ )0+2     *$6/,)7  00+ )0+2     *$6/,)7  00+ )0+2  0DQGUHO,QVHUWV 6W DWL RQ 1 R7RS IW.% 7RS 79'  IW.% 7RS ,QFO ƒ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ƒ  0' IW.%  :(//1$0( :(//%25(0 $QQRWDWLRQ /DVW:2 (QG'DWH  +6 SSP  'DWH  &RPPHQW 666975'3 03URSRVHG&7'6FKHPDWLF-VKRH# 0'-VKRH# 0'+VKRH# 0'$VDQGSHUIV   0' 0'SURSRVHG72:6GHSWK1LSSOH PLQ,' /(8(UG7XELQJWRVXUIDFH&DPFRJDVOLIWPDQGUHOV#7%'%DNHU)+/SDFNHU# 0'[7DQGHP:HGJH$VVHPEO\ )LQDOGHSWKVWREHFDSWXUHGSRVW5:20/ZS7'a 0'7RSRI%LOOHWa 0'0/ZS7'a 0'7RSRI%LOOHWa 0'0/ZS7'a 0'7RSRI%LOOHWa 0'0/ZS7'a 0'7RSRI/LQHUa 0'1RUWKHUQ6ROXWLRQV:HGJH /%DVH3LSH 2'  ORQJ a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ompanyConocoPhillips Alaska, Inc.Well Name:KUPARUK RIV UNIT 3M-05L1-01Initial Class/TypeDEV / PENDGeoArea890Unit11160On/Off ShoreOnProgramDEVField & PoolWell bore segAnnular DisposalPTD#:2211080KUPARUK RIVER, KUPARUK RIV OIL - 490100NA1Permit fee attachedYes2Lease number appropriateYes3Unique well name and numberYes4Well located in a defined poolYes5Well located proper distance from drilling unit boundaryYes6Well located proper distance from other wellsYes7Sufficient acreage available in drilling unitYesDirectional plan view included; no land plat in package.8If deviated, is wellbore plat includedYes9Operator only affected partyYes10Operator has appropriate bond in forceYes11Permit can be issued without conservation orderYes12Permit can be issued without administrative approvalYes13Can permit be approved before 15-day waitNA14Well located within area and strata authorized by Injection Order # (put IO# in comments) (For NA15All wells within 1/4 mile area of review identified (For service well only)NA16Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA17Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)NA18Conductor string providedNA19Surface casing protects all known USDWsNA20CMT vol adequate to circulate on conductor & surf csgNA21CMT vol adequate to tie-in long string to surf csgNo22CMT will cover all known productive horizonsYes23Casing designs adequate for C, T, B & permafrostYes24Adequate tankage or reserve pitNA25If a re-drill, has a 10-403 for abandonment been approvedYes26Adequate wellbore separation proposedNA27If diverter required, does it meet regulationsYesMax formation pressure is 5097 psig(15.74 ppg EMW); will drill w/ 8.6 ppg EMW and maintain overbal w/ MPD28Drilling fluid program schematic & equip list adequateYes29BOPEs, do they meet regulationYesMPSP is 4479 psig; will test BOPs to 5000 psig30BOPE press rating appropriate; test to (put psig in comments)Yes31Choke manifold complies w/API RP-53 (May 84)Yes32Work will occur without operation shutdownYes33Is presence of H2S gas probableNA34Mechanical condition of wells within AOR verified (For service well only)No3M-Pad wells are H2S-bearing. H2S measures are required.35Permit can be issued w/o hydrogen sulfide measuresYes36Data presented on potential overpressure zonesNA37Seismic analysis of shallow gas zonesNA38Seabed condition survey (if off-shore)NA39Contact name/phone for weekly progress reports [exploratory only]ApprDLBDate12/9/2021ApprVTLDate12/20/2021ApprDLBDate12/9/2021AdministrationEngineeringGeologyGeologic Commissioner:Date:Engineering Commissioner:DatePublic CommissionerDate-03