Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
222-005
DATA SUBMITTAL COMPLIANCE REPORT API No.50-029-21235-60-00Well Name/No.KUPARUK RIV UNIT 2W-09L1 Completion Status 1WINJCompletion Date 3/11/2022 Permit to Drill 2220050 Operator ConocoPhillips Alaska, Inc. MD 11295 TVD 6046 Current Status 1WINJ 8/17/2023 UIC Yes Well Log Information: Digital Med/Frmt ReceivedStart Stop OH / CH Comments Log Media Run No Electr Dataset Number Name Interval List of Logs Obtained:GR/Res NoNo YesMud Log Samples Directional Survey REQUIRED INFORMATION (from Master Well Data/Logs) DATA INFORMATION Log/ Data Type Log Scale DF 3/29/20227210 11295 Electronic Data Set, Filename: 2W-09L1 GAMMA RES.las 36434ED Digital Data DF 3/29/2022 Electronic File: 2W-09L1 2MD Final Log.cgm36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1 5MD Final Log.cgm36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1 5TVDSS Final Log.cgm36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 01.cgm36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 02.cgm36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 03.cgm36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 04.cgm36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 05.cgm36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 06.cgm36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 07.cgm36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 09.cgm36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 10.cgm36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 11.cgm36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 12.cgm36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 13.cgm36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 14.cgm36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1 GAMMA RES.ASC36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Digital Data_Run 01.ASC 36434ED Digital Data Thursday, August 17, 2023AOGCC Page 1 of 4 2W-09L1 GAMMA RES.las DATA SUBMITTAL COMPLIANCE REPORT API No.50-029-21235-60-00Well Name/No.KUPARUK RIV UNIT 2W-09L1 Completion Status 1WINJCompletion Date 3/11/2022 Permit to Drill 2220050 Operator ConocoPhillips Alaska, Inc. MD 11295 TVD 6046 Current Status 1WINJ 8/17/2023 UIC Yes DF 3/29/2022 Electronic File: 2W-09L1_PWD Digital Data_Run 02.ASC 36434ED Digital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Digital Data_Run 03.ASC 36434ED Digital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Digital Data_Run 04.ASC 36434ED Digital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Digital Data_Run 05.ASC 36434ED Digital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Digital Data_Run 06.ASC 36434ED Digital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Digital Data_Run 07.ASC 36434ED Digital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Digital Data_Run 09.ASC 36434ED Digital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Digital Data_Run 10.ASC 36434ED Digital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Digital Data_Run 11.ASC 36434ED Digital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Digital Data_Run 12.ASC 36434ED Digital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Digital Data_Run 13.ASC 36434ED Digital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Digital Data_Run 14.ASC 36434ED Digital Data DF 3/29/2022 Electronic File: 2W-09L1 2MD Final Log.pdf36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1 5MD Final Log.pdf36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1 5TVDSS Final Log.pdf36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 01.pdf36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 02.pdf36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 03.pdf36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 04.pdf36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 05.pdf36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 06.pdf36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 07.pdf36434EDDigital Data Thursday, August 17, 2023AOGCC Page 2 of 4 DATA SUBMITTAL COMPLIANCE REPORT API No.50-029-21235-60-00Well Name/No.KUPARUK RIV UNIT 2W-09L1 Completion Status 1WINJCompletion Date 3/11/2022 Permit to Drill 2220050 Operator ConocoPhillips Alaska, Inc. MD 11295 TVD 6046 Current Status 1WINJ 8/17/2023 UIC Yes DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 09.pdf36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 10.pdf36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 11.pdf36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 12.pdf36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 13.pdf36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 14.pdf36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1 NAD27 Definitive Survey.pdf 36434ED Digital Data DF 3/29/2022 Electronic File: 2W-09L1 NAD27.txt36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1 NAD83 Definitive Survey.pdf 36434ED Digital Data DF 3/29/2022 Electronic File: 2W-09L1 NAD83.txt36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1 2MD Final Log.tif36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1 5MD Final Log.tif36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1 5TVDSS Final Log.tif36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 01.tif36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 02.tif36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 03.tif36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 04.tif36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 05.tif36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 06.tif36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 07.tif36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 09.tif36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 10.tif36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 11.tif36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 12.tif36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 13.tif36434EDDigital Data DF 3/29/2022 Electronic File: 2W-09L1_PWD Log_Run 14.tif36434EDDigital Data Thursday, August 17, 2023AOGCC Page 3 of 4 DATA SUBMITTAL COMPLIANCE REPORT API No.50-029-21235-60-00Well Name/No.KUPARUK RIV UNIT 2W-09L1 Completion Status 1WINJCompletion Date 3/11/2022 Permit to Drill 2220050 Operator ConocoPhillips Alaska, Inc. MD 11295 TVD 6046 Current Status 1WINJ 8/17/2023 UIC Yes Well Cores/Samples Information: ReceivedStart Stop Comments Total Boxes Sample Set NumberName Interval INFORMATION RECEIVED Completion Report Production Test Information Geologic Markers/Tops Y Y / NA Y Comments: Compliance Reviewed By:Date: Mud Logs, Image Files, Digital Data Composite Logs, Image, Data Files Cuttings Samples Y / NA Y Y / NA Directional / Inclination Data Mechanical Integrity Test Information Daily Operations Summary Y Y / NA Y Core Chips Core Photographs Laboratory Analyses Y / NA Y / NA Y / NA COMPLIANCE HISTORY Date CommentsDescription Completion Date:3/11/2022 Release Date:2/8/2022 Thursday, August 17, 2023AOGCC Page 4 of 4 M. Guhl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y Meredith Guhl at 2:05 pm, Mar 30, 2022 Completion Date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igitally signed by James J. Ohlinger DN: C=US, OU=ConocoPhillips, O=Wells - Coiled Tubing Drlling, CN=James J. Ohlinger, E=James.J.Ohlinger@cop.comReason: I am the author of this document Location: your signing location here Date: 2022.03.30 11:54:28-08'00'Foxit PDF Editor Version: 11.0.0 James J. Ohlinger !"# $%&&'(')*+, !-./+ 0 1223&434&3453&4535435&324 67252"# 18 0 2"# "!90 .! !)/232324 8 0 2&54"# '2& : 0. !) !-! 882&4 !"3;.<.# +, !- 2&&2&46:# &5$%&&/=. &4 25$%&&/=. 2 55$14/=. & >/ !)8/ 25 25&4 ?@625& :/ !)8/2 2444 / !)8/242 242 *A3& *.8. !B2 Last Tag Annotation Depth (ftKB) End Date Wellbore Last Mod By Last Tag: RKB 7,742.0 1/23/2022 2W-09 fergusp Last Rev Reason Annotation End Date Wellbore Last Mod By Rev Reason: Set LTP post-CTD 3/22/2022 2W-09 spilch Casing Strings Casing Description CONDUCTOR OD (in) 16 ID (in) 15.06 Top (ftKB) 30.2 Set Depth (ftKB) 115.0 Set Depth (TVD) … 115.0 Wt/Len (l… 62.50 Grade H-40 Top Thread WELDED Casing Description SURFACE OD (in) 9 5/8 ID (in) 8.92 Top (ftKB) 30.2 Set Depth (ftKB) 3,549.3 Set Depth (TVD) … 3,086.6 Wt/Len (l… 36.00 Grade J-55 Top Thread BUTT Casing Description PRODUCTION OD (in) 7 ID (in) 6.28 Top (ftKB) 27.0 Set Depth (ftKB) 7,891.3 Set Depth (TVD) … 6,254.2 Wt/Len (l… 26.00 Grade J-55 Top Thread BUTT Casing Description L1 Liner OD (in) 2 3/8 ID (in) 1.99 Top (ftKB) 7,199.6 Set Depth (ftKB) 11,295.0 Set Depth (TVD) … Wt/Len (l… 4.60 Grade L-80 Top Thread STL Liner Details Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com Nominal ID (in) 7,199.6 5,700.4 39.87 SBR (Seal Bore Receptacle) NSAK, 225 Seal Bore Deployment Sleeve, L-80 (Tensile 46k) 2.250 10,099.0 Deployment Sleeve NSAK, 350-238, OH Permanent QCLL, L-80 (Tensile 46k) 1.920 Tubing Strings Tubing Description TUBING String Ma… 3 1/2 ID (in) 2.99 Top (ftKB) 22.5 Set Depth (ft… 7,536.0 Set Depth (TVD) (… 5,962.9 Wt (lb/ft) 9.30 Grade J-55 Top Connection EUE 8RD Completion Details Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Nominal ID (in) OD Nominal (in) Make Model 22.5 22.5 0.09 HANGER 3.500 8.000 1,890.1 1,837.5 32.39 SAFETY VLV 2.810 5.937 1,977.0 1,910.7 32.89 GAS LIFT 2.867 5.312 MMH FMHO 3,354.2 2,978.9 53.94 GAS LIFT 2.867 5.312 MMH FMHO 3,945.4 3,325.8 46.73 GAS LIFT 2.867 5.312 MMH FMHO 4,859.9 3,979.8 43.63 GAS LIFT 2.867 5.312 MMH FMHO 5,467.9 4,418.8 43.62 GAS LIFT 2.867 5.312 MMH FMHO 6,043.2 4,835.7 43.00 GAS LIFT 2.867 5.312 MMH FMHO 6,580.1 5,231.9 41.80 GAS LIFT 2.867 5.312 MMH FMHO 7,124.2 5,642.6 40.02 GAS LIFT 2.867 5.312 MMH FMHO 7,166.7 5,675.2 39.94 PBR 3.000 5.000 7,180.5 5,685.7 39.91 PACKER 2.937 5.968 7,301.0 5,778.6 39.17 BLAST RING 2.992 3.500 7,464.3 5,906.1 38.03 BLAST JT 3.000 5.250 7,504.8 5,938.1 37.61 LOCATOR 3.000 4.500 7,505.6 5,938.8 37.60 PACKER 4.000 5.875 7,508.9 5,941.4 37.55 SBE 4.000 5.000 7,524.0 5,953.3 37.34 NIPPLE 2.750 4.540 7,535.2 5,962.2 37.19 WLEG 2.992 3.500 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Des Com Run Date ID (in) SN 7,169.0 5,676.9 39.93 Casing Leak Leak identified @~7169' by EL (READ Acoustic LDL). BISN bead casing leak repair completed 11/19/21. 7/11/2019 6.260 7,193.6 5,695.8 39.88 PACKER NORTHERN SOLUTIONS MONO-PAK LINER TOP PACKER W/ 1.781" X NIPPLE (TOP OF LTP 7193.6' RKB, X NIPPLE 7203.1' RKB) 3/21/2022 1.781 A22427201- R00 7,220.0 5,716.1 39.73 LEAK - GLM LDL. LEAK DETECTED AT KNOWN PRE- EXISTING LEAK @ 7220' Inj Mandrel #9 5/29/2011 Mandrel Inserts St ati on N o/Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Make Model OD (in) Serv Valve Type Latch Type Port Size (in) TRO Run (psi) Run Date Com 1 1,977.0 1,910.7 32.89 1 GAS LIFT DMY BK-2 0.000 0.0 12/2/1984 2 3,354.2 2,978.9 53.94 1 GAS LIFT DMY BK-2 0.000 0.0 12/2/1984 3 3,945.4 3,325.8 46.73 1 GAS LIFT DMY BK-2 0.000 0.0 12/2/1984 4 4,859.9 3,979.8 43.63 1 GAS LIFT DMY BK-2 0.000 0.0 12/2/1984 5 5,467.9 4,418.8 43.62 1 GAS LIFT DMY BK-2 0.000 0.0 12/2/1984 6 6,043.2 4,835.7 43.00 1 GAS LIFT DMY BK-2 0.000 0.0 12/2/1984 7 6,580.1 5,231.9 41.80 1 GAS LIFT DMY BK-2 0.000 0.0 12/2/1984 8 7,124.2 5,642.6 40.02 1 GAS LIFT DMY BK-2 0.000 0.0 12/10/2021 9 7,219.4 5,715.6 39.73 INJ OPEN 1/24/2022 1 0 7,291.9 5,771.5 39.23 1 1/2 INJ DMY RM 0.000 0.0 2/12/1993 1 1 7,487.6 5,924.5 37.80 INJ OPEN 1/24/2022 Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft )Type Com 7,333.0 7,444.0 5,803.5 5,890.1 C-4, C-3, C-1, UNIT B, 2W-09 2/8/1985 12.0 IPERF 120° phasing; 5" Dressler Atlas HD 7,470.0 7,478.0 5,910.6 5,916.9 UNIT B, 2W-09 2/8/1985 12.0 IPERF 120° phasing; 5" Dressler Atlas JJ 2W-09, 3/29/2022 2:43:58 PM Vertical schematic (actual) L1 Liner; 7,199.6-11,295.0 PRODUCTION; 27.0-7,891.3 IPERF; 7,600.0-7,654.0 PACKER; 7,505.6 INJECTION; 7,487.6 IPERF; 7,470.0-7,478.0 IPERF; 7,333.0-7,444.0 Squeeze – Reservoir Squeeze; 7,220.0 ftKB INJECTION; 7,291.9 INJECTION; 7,219.4 LEAK - GLM; 7,220.0 PACKER; 7,193.6 PACKER; 7,180.5 Casing Leak; 7,169.0 Remedial; 7,145.0 ftKB GAS LIFT; 7,124.2 GAS LIFT; 6,580.1 GAS LIFT; 6,043.2 GAS LIFT; 5,467.9 GAS LIFT; 4,859.9 GAS LIFT; 3,945.4 SURFACE; 30.2-3,549.3 GAS LIFT; 3,354.2 GAS LIFT; 1,977.0 SAFETY VLV; 1,890.1 CONDUCTOR; 30.2-115.0 KUP INJ KB-Grd (ft) 34.29 RR Date 12/2/1984 Other Elev… 2W-09 ... TD Act Btm (ftKB) 7,920.0 Well Attributes Field Name KUPARUK RIVER UNIT Wellbore API/UWI 500292123500 Wellbore Status INJ Max Angle & MD Incl (°) 58.00 MD (ftKB) 3,500.00 WELLNAME WELLBORE2W-09 Annotation Last WO: End DateH2S (ppm) DateComment SSSV: LOCKED OUT Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft )Type Com 7,600.0 7,654.0 6,014.2 6,057.9 A-4, A-3, 2W-09 2/8/1985 4.0 IPERF 120° phasing; 5" Dressler Atlas JJ Cement Squeezes Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Des Com Pump Start Date 7,145.0 7,153.0 5,658.5 5,664.7 Remedial BiSN Bead Repair 11/19/2021 7,220.0 7,505.0 5,716.1 5,938.3 Squeeze – Reservoir Squeeze 2/3/2022 Notes: General & Safety End Date Annotation 5/29/2011 NOTE: IDENTIFIED LEAK AT INJECTION MANDREL 7221' RKB (STA 9) BY LDL 2W-09, 3/29/2022 2:43:58 PM Vertical schematic (actual) L1 Liner; 7,199.6-11,295.0 PRODUCTION; 27.0-7,891.3 IPERF; 7,600.0-7,654.0 PACKER; 7,505.6 INJECTION; 7,487.6 IPERF; 7,470.0-7,478.0 IPERF; 7,333.0-7,444.0 Squeeze – Reservoir Squeeze; 7,220.0 ftKB INJECTION; 7,291.9 INJECTION; 7,219.4 LEAK - GLM; 7,220.0 PACKER; 7,193.6 PACKER; 7,180.5 Casing Leak; 7,169.0 Remedial; 7,145.0 ftKB GAS LIFT; 7,124.2 GAS LIFT; 6,580.1 GAS LIFT; 6,043.2 GAS LIFT; 5,467.9 GAS LIFT; 4,859.9 GAS LIFT; 3,945.4 SURFACE; 30.2-3,549.3 GAS LIFT; 3,354.2 GAS LIFT; 1,977.0 SAFETY VLV; 1,890.1 CONDUCTOR; 30.2-115.0 KUP INJ 2W-09 ... WELLNAME WELLBORE2W-09 Page 1/13 2W-09 Report Printed: 3/29/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/23/2022 18:00 2/23/2022 20:30 2.50 MIRU, MOVE DMOB P NES trucks on location 19:30, Pick shop, prep halfway house. 2/23/2022 20:30 2/23/2022 21:00 0.50 MIRU, MOVE SFTY P PJSM w NES rig move crew and rig crew. 2/23/2022 21:00 2/23/2022 21:30 0.50 MIRU, MOVE DMOB P Jack service mod, sow up, pull mats. Pull service mod from well row, stage on pad, back to jack, drop sow. 2/23/2022 21:30 2/23/2022 22:00 0.50 MIRU, MOVE DMOB P Jack sub mod, sow up, pull mats. Pull sub mod from well row, stage on pad, back to jack, drop sow. 2/23/2022 22:00 2/23/2022 22:42 0.70 MIRU, MOVE DMOB P Jeep up service and sup, attach sows and weighted sows, 2/23/2022 22:42 2/23/2022 22:48 0.10 MIRU, MOVE DMOB P Round up all crews, final walk around, load up 2/23/2022 22:48 2/24/2022 00:00 1.20 MIRU, MOVE MOB P Roll off 3G pad toward CPF3 2/24/2022 00:00 2/24/2022 05:00 5.00 MIRU, MOVE MOB P Continue to move rig from 3G pad to 2W -09. 0.0 0.0 2/24/2022 05:00 2/24/2022 06:30 1.50 MIRU, MOVE MOB P Stop at CPF 2 for re-fuel 0.0 0.0 2/24/2022 06:30 2/24/2022 08:30 2.00 MIRU, MOVE MOB P Move rig from CPF 2 to 2W pad 0.0 0.0 2/24/2022 08:30 2/24/2022 09:30 1.00 MIRU, MOVE MOB P Remove jeeps and prep pad , pad in poor shape contact roads and pads to come level pad 0.0 0.0 2/24/2022 09:30 2/24/2022 11:30 2.00 MIRU, MOVE PRLO T Roads and pads level location and remove overburden snow for setting rig // Transport shop and half way house while waiting on pad 0.0 0.0 2/24/2022 11:30 2/24/2022 12:45 1.25 MIRU, MOVE MOB P Spot shop and halfway house 0.0 0.0 2/24/2022 12:45 2/24/2022 13:30 0.75 MIRU, MOVE MOB P Spot sub over 2W-09 0.0 0.0 2/24/2022 13:30 2/24/2022 14:45 1.25 MIRU, MOVE MOB P Mat and shim up sub section 0.0 0.0 2/24/2022 14:45 2/24/2022 15:15 0.50 MIRU, MOVE MOB P Spot pits 0.0 0.0 2/24/2022 15:15 2/24/2022 16:15 1.00 MIRU, MOVE MOB P Mat and shim up pits 0.0 0.0 2/24/2022 16:15 2/24/2022 18:00 1.75 MIRU, MOVE MOB P Adjust shimms on sub and service side to align walkways. Set down both mods, release final sow. **Accept rig at 18:00 0.0 0.0 2/24/2022 18:00 2/25/2022 00:00 6.00 MIRU, WHDBOP RURD P RU to well, work RU checklist, nipple up stack. Install risers. 0.0 0.0 2/25/2022 00:00 2/25/2022 01:00 1.00 MIRU, WHDBOP RURD P Continue to work RU check list, RU interconnect, harvest fresh RKB's. 0.0 0.0 2/25/2022 01:00 2/25/2022 01:30 0.50 MIRU, WHDBOP RURD P Prespud 0.0 0.0 2/25/2022 01:30 2/25/2022 04:00 2.50 MIRU, WHDBOP RURD P Contiune to work RU check list, complet valve check list. ASRC valve crew serviced tree, swabs and tangos. PJSM 0.0 0.0 2/25/2022 04:00 2/25/2022 05:00 1.00 MIRU, WHDBOP RURD P Fluid pack and purge, Regrease B valves 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 3/11/2022 Page 2/13 2W-09 Report Printed: 3/29/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/25/2022 05:00 2/25/2022 12:00 7.00 MIRU, WHDBOP BOPE P BOP test wintess waived by AOGCC Robert Noble 250/3500 psi Test 1. Swab 2- Pass Test 2. Blind/Shear, BOP TV2, Charlie 4, 5, 8, &12- Pass Test 3. BOP TV 1, Charlie 3, 7, & 11 - Charlie 11 F/P greased and cycled Test 4. Manual choke D & Super choke C - Pass Test 5. Romeo 3, Bleeder 3, Tango 2, Charlie 2, & 10 - Romeo 3 Fail Test 6. Charlie 1, 9, Bravo 5, and Tango 1 – install TIW test joint - Pass Test 7. Lower 2” pipe slip rams, TIW #1, Romeo 1, Bleeder 1 - Pass Test 8. Annular BOP - Pass Test 9. Upper 2” pipe slip rams, Bravo 6, & 8 - Pass Test 10. Bravo 7 – swap out 2” test joint for 2-3/8” - Pass Test 11. 2-3/8” pipe slip rams, TIW#2 – check N2 levels, swap to 2” test joint - Pass Test 12. Draw down accumulator. Koomy pressure, close all record stable pressure, time to increase 200 psi 22, entire recovery time 50 - Test 13. Stab injector and line up to reverse circulate coil, test inner reel valve and stripper. - Tested all gas detectors, pits, cellar, Verified flow alarms - 0.0 0.0 2/25/2022 12:00 2/26/2022 00:00 12.00 MIRU, WHDBOP WAIT T Phase 3 weather Convoy crew change behind blade / blower. Fuel truck convoy topped of ULSD and LEPD. 0.0 0.0 2/26/2022 00:00 2/26/2022 15:45 15.75 MIRU, WHDBOP WAIT T Wait on weather - Phase 3 weather 0.0 0.0 2/26/2022 15:45 2/26/2022 16:00 0.25 MIRU, WHDBOP SFTY P Safety meeting with crews to get them focused on the task getting back to work // prep for testing inner reel valve stripper and R3 0.0 0.0 2/26/2022 16:00 2/26/2022 18:00 2.00 MIRU, WHDBOP BOPE P Lay down test joint and install QTS for inner reel valve stripper / R3 Fail inner reel valve, grease and retest. Test - 250/350 psi - pass 0.0 0.0 2/26/2022 18:00 2/26/2022 20:00 2.00 MIRU, WHDBOP CTOP P Crew change, PJSM, unstab injector, make up ODS PDL, fluid pack, PT to 2,500 psi, - good 0.0 0.0 2/26/2022 20:00 2/26/2022 22:00 2.00 MIRU, WHDBOP CTOP P Make up DS PDL, fluid pack, Push fluid to the Tiger tank, PT both to 2,500 psi, - good, Blow down TT line, blow down well control choke. 0.0 0.0 2/26/2022 22:00 2/26/2022 23:00 1.00 MIRU, WHDBOP PULD P PJSM, valve alignment check list - set valves for PD. 0.0 0.0 2/26/2022 23:00 2/27/2022 00:00 1.00 MIRU, WHDBOP PULD P PJSM, PU & PD BHA #1 - Cement / composite bride plug milling assembly. 0.0 0.0 2/27/2022 00:00 2/27/2022 01:12 1.20 SLOT, WELLPR PULD P Continue to PD BHA #1 - Cement / composite bride plug milling assembly. Inspect and replace stripper. Bump up set counters, 0.0 57.2 2/27/2022 01:12 2/27/2022 02:42 1.50 SLOT, WELLPR TRIP P RIH with BHA #1. flushing well with seawater. 57.2 7,250.0 2/27/2022 02:42 2/27/2022 02:54 0.20 SLOT, WELLPR DLOG P Tie into the K1 for a -17' correction. PU Wt 33 k lbs 7,250.0 7,271.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 3/11/2022 Page 3/13 2W-09 Report Printed: 3/29/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/27/2022 02:54 2/27/2022 03:42 0.80 SLOT, WELLPR DLOG P Increase pump to 2.25 bpm, swap to Duo vis, displace well to duovis. Close EDC, PU Wt 34 k lbs. RIH and dry tag TOC @ 7,313' PU Wt 33 k lbs, 7,250.0 7,313.0 2/27/2022 03:42 2/27/2022 06:33 2.85 SLOT, WELLPR MILL P Set parameters, OA 5 psi, A 0 psi, WH 0 psi, CT 4412 psi, @ 1.80 bpm in free spin 1012 psi. Mill cement from 7313. 7,313.0 7,418.0 2/27/2022 06:33 2/27/2022 06:48 0.25 SLOT, WELLPR DLOG P Geo question tie in // pick up to tie in // +1' Correction 7,418.0 7,418.0 2/27/2022 06:48 2/27/2022 09:57 3.15 SLOT, WELLPR MILL P Set parameters, OA 5 psi, A 0 psi, WH 0 psi, CT 4412 psi, @ 1.80 bpm in free spin 1012 psi. Mill cement from 7313. Tagged GLM @ 7479' Tagged Bridge Pulg @ 7483.79 Tagged GLM @ 7486' Free past 7486' down to 7500' 7,418.0 7,500.0 2/27/2022 09:57 2/27/2022 10:21 0.40 SLOT, WELLPR REAM P Back ream through jewelery and cement @ 10'/min to 7300' // PU Wt. 32K // Clean no motor work 7,500.0 7,300.0 2/27/2022 10:21 2/27/2022 11:57 1.60 SLOT, WELLPR TRIP P POOH for cleanout BHA# 2 // Jog @ 600' // Open EDC // Tag up space out 1.2' 7,300.0 56.0 2/27/2022 11:57 2/27/2022 13:27 1.50 SLOT, WELLPR PULD P PUD BHA# 1 Cement milling assembly 56.0 0.0 2/27/2022 13:27 2/27/2022 13:42 0.25 SLOT, WELLPR PULD P Lay down BOT mill and motor // 2.79NG 0.0 0.0 2/27/2022 13:42 2/27/2022 13:57 0.25 SLOT, WELLPR PULD P Pick up HOT and NS motor and mill // Mill 2.73NG 0.0 0.0 2/27/2022 13:57 2/27/2022 15:03 1.10 SLOT, WELLPR PULD P Pressure Deploy BHA# 2 NS 1° AKO fix bend w/ 2.73 NG DSM 0.0 65.0 2/27/2022 15:03 2/27/2022 16:33 1.50 SLOT, WELLPR TRIP P Tag up set depth 65.00 // RIH w/ BHA# 2 clean out assembly 65.0 7,250.0 2/27/2022 16:33 2/27/2022 16:39 0.10 SLOT, WELLPR DLOG P Tie in K1 -21' Correction 7,250.0 7,270.0 2/27/2022 16:39 2/27/2022 16:51 0.20 SLOT, WELLPR TRIP P Pick up to 6150' 7,270.0 6,150.0 2/27/2022 16:51 2/27/2022 18:39 1.80 SLOT, WELLPR COCF P Perform clean out of cement sheath T/7670' oriented HS 6,150.0 7,670.0 2/27/2022 18:39 2/27/2022 20:33 1.90 SLOT, WELLPR COCF P PUH, PU Wt 35 k lbs. Orient TF to LS once in TT. Launch 10 x10, RBIH to let sweep exit bit at 7,670', chase sweep up hole, large unload of cement at the shaker. 7,670.0 6,130.0 2/27/2022 20:33 2/27/2022 21:33 1.00 SLOT, WELLPR TRIP P Complete reaming passes of clean out, RIH to logging start depth, open EDC, establish rate of 2.5 bpm CT 4787 psi. OA 13 psi, IA 0 psi. 6,130.0 7,350.0 2/27/2022 21:33 2/27/2022 22:21 0.80 SLOT, WELLPR DLOG P Log CCL from 7,350' to 7670' bit depth. CCL offset 53.2' Logging interval 7,297' - 7,617', RIH @ 18 ft/min. Stack out at 7,614'. Pick up clean 31 k lbs, RBIH, same issue, CT WQt from 11.7 k to -4 k lbs @ 7,618. Abort CCL. Swap Coiltrack back to normal mode W WOB reading. register 8 k WOB 6,130.0 7,614.0 2/27/2022 22:21 2/28/2022 00:00 1.65 SLOT, WELLPR WASH P Perform a clean out to 7670' with multiple passes chasing gel sweeps to the tubing tail. Obstruction at 7614 seems to have moved down hole to 7670'. Dry drift to 7670' - clean. 7,614.0 7,340.0 2/28/2022 00:00 2/28/2022 00:30 0.50 SLOT, WELLPR TRIP P RIH logging CCL to 7670' bit depth - 7617' sensor depth 7,342.0 7,670.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 3/11/2022 Page 4/13 2W-09 Report Printed: 3/29/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 2/28/2022 00:30 2/28/2022 02:12 1.70 SLOT, WELLPR TRIP P POOH chasing sweeps 7,670.0 40.0 2/28/2022 02:12 2/28/2022 03:42 1.50 SLOT, WELLPR PULD P Preasure undeploy BHA #2 - 2.74" clean out BHA 40.0 0.0 2/28/2022 03:42 2/28/2022 04:42 1.00 SLOT, WELLPR PULD P Stab on and jet stack, unstab. 0.0 0.0 2/28/2022 04:42 2/28/2022 06:24 1.70 SLOT, WELLPR PULD P PD Northern Solutions High Expansion Wedge. 0.0 73.0 2/28/2022 06:24 2/28/2022 09:25 3.02 SLOT, WELLPR PULD P RIH W HEW. Tie in K1 -20.5' Correction // Pu. Wt. 31K // RIH to set depth @ 7613.75 bit depth 7606 TOWS // Stage up pump 1500, 2500, 3000, 4250 psi W/ 2150 Diff // no change on DHWOB tool sheared// RIH T 7622 no DHWOB change // Bad Set // Clean up through tubing tail 73.0 7,622.0 2/28/2022 09:25 2/28/2022 11:04 1.65 SLOT, WELLPR TRIP T POOH for caliper run 7,622.0 72.0 2/28/2022 11:04 2/28/2022 11:55 0.85 SLOT, WELLPR PULD T Tag up space out 1.2' // PJSM // PUD BHA# 3 NS HES setting tool 72.0 0.0 2/28/2022 11:55 2/28/2022 12:25 0.50 SLOT, WELLPR PULD T Lay down HEW Setting tool 0.0 0.0 2/28/2022 12:25 2/28/2022 13:55 1.50 SLOT, WELLPR WAIT T Wait for Read Cased Hole to arrive on location ( 13:20 ) // Read Cased Hole programing tools 0.0 0.0 2/28/2022 13:55 2/28/2022 15:25 1.50 SLOT, WELLPR PULD T Pick up and deploy BHA# 4 Caliper run // Read Caliper and BHI BHA 0.0 50.0 2/28/2022 15:25 2/28/2022 17:25 2.00 SLOT, WELLPR TRIP T RIH with caliper to caliper depth 7650' // Tie in K1 -21' Correction 50.0 7,650.0 2/28/2022 17:25 2/28/2022 18:01 0.60 SLOT, WELLPR WAIT T Wait on caliper to open up 7,650.0 7,650.0 2/28/2022 18:01 2/28/2022 18:16 0.25 SLOT, WELLPR DLOG T Caliper F/ 7650 T/ 7450' 7,650.0 7,450.0 2/28/2022 18:16 2/28/2022 19:52 1.60 SLOT, WELLPR TRIP T POOH to render caliper data 7,450.0 72.0 2/28/2022 19:52 2/28/2022 20:52 1.00 SLOT, WELLPR PULD T Tag up space out 1.2' // PUD BHA# 4 caliper run 72.0 0.0 2/28/2022 20:52 2/28/2022 21:28 0.60 SLOT, WELLPR WAIT T Wait on caliper data rendering 0.0 0.0 2/28/2022 21:28 2/28/2022 23:00 1.53 SLOT, WELLPR PULD T PJSM // Pick up BOT 0° AKO fixed bend motor w/ Hailey 4 blade underreamer and 2.72 junk mill // Pressure Deploy BHA# 5 0.0 70.0 2/28/2022 23:00 3/1/2022 00:00 1.00 SLOT, WELLPR RGRP T Fix CTES counter for depth tracking 70.0 70.0 3/1/2022 00:00 3/1/2022 06:12 6.20 SLOT, WELLPR RGRP T Fix CTES counter for depth tracking / coil fatigue calculations. Repair issue, bump up, set counters. 70.0 70.0 3/1/2022 06:12 3/1/2022 07:42 1.50 SLOT, WELLPR TRIP T Fix CTES counter for depth tracking / coil fatigue calculations RIH 70.0 7,250.0 3/1/2022 07:42 3/1/2022 07:54 0.20 SLOT, WELLPR DLOG T Tie into the K1 for a -21' correction, 7,250.0 7,267.0 3/1/2022 07:54 3/1/2022 09:06 1.20 SLOT, WELLPR UREM T RIH, Close EDC, PU Wt 35 k lbs. Set rate, CT 4995 psi @ 1.80 bpm in and 1.80 bpm out, IA 0 psi OA 12 psi, WH zero , holding 1 for 1, BHP 2,358 psi. free spin 1,853 psi. CT weight 15 k lbs, ream down to 7,637' at 0.5 ft/ min. PU and ream up, coil pressured up at 7633'. Blead down very slowly. Tried to pump min rate, coil pressure increased rapidly. 7,267.0 7,637.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 3/11/2022 Page 5/13 2W-09 Report Printed: 3/29/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 3/1/2022 09:06 3/1/2022 12:18 3.20 SLOT, WELLPR TRIP T Park, open EDC, pump 2.5 bpm, pump 5x5 sweep while PUH slowly Once sweep exits 7" and all in tubing increase pulling speed. Tool hand suggested we try pumping again once blades pulled into the 3.5" Parked closed EDC, pumped with reasonable pressures. RBIH to 7" Online at 1.8 bpm, low pressure, 190 psi diff. Something still wrong. Open EDC POOH pumping 2.5 bpm 7,637.0 64.0 3/1/2022 12:18 3/1/2022 13:48 1.50 SLOT, WELLPR PULD T Bump up, PUD BHA #5. Motor parted. Bottom half of motor, underreamer, and bit left in hole. Rotor, trnasmition, underreamer, and junk mill left in hole. LOA 12' 64.0 0.0 3/1/2022 13:48 3/1/2022 14:00 0.20 SLOT, WELLPR CTOP T Consult with town engineering. 0.0 0.0 3/1/2022 14:00 3/1/2022 15:24 1.40 SLOT, WELLPR PULD T PD BHA #6, underreamer run #2. 0.0 54.0 3/1/2022 15:24 3/1/2022 16:48 1.40 SLOT, WELLPR TRIP T RIH 54.0 7,250.0 3/1/2022 16:48 3/1/2022 17:00 0.20 SLOT, WELLPR DLOG T Tie into the K1 for -20.5' 7,250.0 7,265.3 3/1/2022 17:00 3/1/2022 17:15 0.25 SLOT, WELLPR DLOG T Continue to RIH., park and close EDC 7,250.0 7,265.3 3/1/2022 17:15 3/1/2022 17:30 0.25 SLOT, WELLPR TRIP T RIH, tag TOF @ 7,635' DHWOB 500lbs, PUH clean 7,265.3 7,635.0 3/1/2022 17:30 3/1/2022 17:48 0.30 SLOT, WELLPR UREM T PUH to 7,590', bring pump online 1.8 bpm @ 2,797 psi / Diff 785 psi 7,635.0 7,590.0 3/1/2022 17:48 3/1/2022 18:12 0.40 SLOT, WELLPR UREM T 7,590' - 7,620' x 2 clean no motor work observed, WHP 0, BHP 3203, IA 0, OA 12 7,590.0 7,620.0 3/1/2022 18:12 3/1/2022 19:42 1.50 SLOT, WELLPR TRIP T PUH, open EDC, POOH 7,620.0 54.4 3/1/2022 19:42 3/1/2022 21:00 1.30 SLOT, WELLPR BHAH T At surface, space out, PUD UR assembly 54.4 0.0 3/1/2022 21:00 3/1/2022 21:45 0.75 SLOT, WELLPR CTOP T HES on location with caliper, load in tools, confirm measurments 4.6" from bullnose to center of caliper. 0.0 0.0 3/1/2022 21:45 3/1/2022 22:00 0.25 SLOT, WELLPR SFTY T PJSM w/rig crew and HES rep 0.0 0.0 3/1/2022 22:00 3/1/2022 22:30 0.50 SLOT, WELLPR BHAH T MU, camera adaptor sub, and HES caliper in hole, confirm caliper arms operation (good) 0.0 19.6 3/1/2022 22:30 3/1/2022 23:00 0.50 SLOT, WELLPR TRIP T Stab INJH, tag up, reset counter depths, RIH, test caliper to confirm tool operation (good) 19.6 100.0 3/1/2022 23:00 3/2/2022 00:00 1.00 SLOT, WELLPR TRIP T RIH, pumping min rate 0.38 bpm at 976 pump pressure 100.0 5,166.0 3/2/2022 00:00 3/2/2022 00:15 0.25 SLOT, WELLPR TRIP T Continue IH, 5,166' 5,166.0 7,200.0 3/2/2022 00:15 3/2/2022 00:27 0.20 SLOT, WELLPR DLOG T Log formation for depth control w/HES gamma - 19.5' 7,200.0 7,305.0 3/2/2022 00:27 3/2/2022 00:39 0.20 SLOT, WELLPR TRIP T RIH 7,305.0 7,625.0 3/2/2022 00:39 3/2/2022 01:09 0.50 SLOT, WELLPR DLOG T Park open caliper arms, Log up at 50 fpm to 7,200', good data. 7,625.0 7,200.0 3/2/2022 01:09 3/2/2022 02:39 1.50 SLOT, WELLPR TRIP T POOH, PUW 33 k CTSW, pumping 1.1 bpm at 1690 psi pump pressure 7,200.0 19.6 3/2/2022 02:39 3/2/2022 03:09 0.50 SLOT, WELLPR BHAH T At surface, close swab #2, LD and inspect caliper, all arms accounted for, 19.6 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 3/11/2022 Page 6/13 2W-09 Report Printed: 3/29/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 3/2/2022 03:09 3/2/2022 03:54 0.75 PROD1, WHPST BHAH T PU HEW place into well, stand by for HES data 0.0 0.0 3/2/2022 03:54 3/2/2022 05:00 1.10 PROD1, WHPST BHAH T Continue PD HEW setting Assembly BHA #8 0.0 73.0 3/2/2022 05:00 3/2/2022 07:30 2.50 PROD1, WHPST BHAH T Tool failure, troubleshoot, wire good, tool bad, - PUD, swap coiltrak - PD BHA #9 - HEw setting assembly 73.0 73.0 3/2/2022 07:30 3/2/2022 09:24 1.90 PROD1, WHPST TRIP T Tag up, reset counter depths, RIH 73.0 72,500.0 3/2/2022 09:24 3/2/2022 09:36 0.20 PROD1, WHPST DLOG T Log K1 marker for depth control - 21' correction 7,250.0 7,282.6 3/2/2022 09:36 3/2/2022 10:30 0.90 PROD1, WHPST WPST T RIH to set depth of 7613.72' PU to neutral weight, 28 k lbs. Close EDC. CT Wt 27.8 WOB 0.00. Pump on to 0.5 bpm stage to 1,500 psi, WOB to 2 k lbs, CT wt 26 k lbs, stage to 2,000 psi, WOB 2.9 k lbs, CT Wt 25.8 k lbs, stage to 2,500 psi, WOB 3.5 CT Wt 22.6, Sheared 2500 psi and 2100 diff. Set down 2.5 k lbs, PU Wt 35 k lbs Good set **TOWS 7605' 7,282.6 7,613.7 3/2/2022 10:30 3/2/2022 12:06 1.60 PROD1, WHPST TRIP P PUH, park and open EDC, POOH 7,613.7 53.0 3/2/2022 12:06 3/2/2022 13:18 1.20 PROD1, WHPST PULD P PUD BHA # 9. 53.0 0.0 3/2/2022 13:18 3/2/2022 14:30 1.20 PROD1, WHPST PULD P PUD BHA # 10. Check stripper - ok. 0.0 77.0 3/2/2022 14:30 3/2/2022 15:48 1.30 PROD1, WHPST TRIP P RIH W BHA #10- milling assembly - string mill 2.73" NG, DSM 2.72" NG 77.0 7,270.0 3/2/2022 15:48 3/2/2022 16:00 0.20 PROD1, WHPST DLOG P tie into the K1 for a -20.5' correction 7,270.0 7,289.1 3/2/2022 16:00 3/2/2022 16:24 0.40 PROD1, WHPST TRIP P Continue to RIH, close EDC, PU Wt 35 k lbs, dry tag TOWC @ 7609.92 PU and set parameters. 7,289.1 7,609.7 3/2/2022 16:24 3/2/2022 18:00 1.60 PROD1, WHPST MILL P OA 0 psi, IA 13 psi, WH 341 psi, CT 4058 psi @ 1.80 bpm in and 1.80 bpm out, free spin diff 665 psi, CT Wt 13.2 k lbs, Start milling 7,609.7 - 50-60 lbs motor work 7,609.7 7,610.8 3/2/2022 18:00 3/2/2022 20:00 2.00 PROD1, WHPST MILL P OBM, 1.78 bpm @ 4,340 psi, WHP 323, BHP 3,659, IA 0, OA 14 7,610.8 7,612.8 3/2/2022 20:00 3/2/2022 22:00 2.00 PROD1, WHPST MILL P Mill exited casing @ 7,612.8', continue milling ahead allowing string reamer to dress exit, 1.79 bpm @ 4,228 psi, WHP 324, BHP 3,667, IA 0, OA 16 *** Note: Sample indicating casing exit *** Note: Losing 0.10 bpm to formation 7,612.8 7,614.5 3/2/2022 22:00 3/3/2022 00:00 2.00 PROD1, WHPST MILL P Drill rat hole, 1.80 bpm @ 4,317 psi, WHP 321, BHP 3,683, IA 0, OA 18, 1.3 k DHWOB 7,614.5 7,626.0 3/3/2022 00:00 3/3/2022 00:45 0.75 PROD1, WHPST MILL P Continue drilling rat hole, 1.80 bpm @ 4,317 psi, WHP 321, BHP 3,683, IA 0, OA 18, 1.3 k DHWOB 7,626.0 7,634.0 3/3/2022 00:45 3/3/2022 01:45 1.00 PROD1, WHPST REAM P PUH, PUW 30 k CTSW, 60 fph, 20 LOHS, 30 ROHS, 7,616'-7,608', 1.79 bpm/4,308 psi, WHP 309, BHP 3.735, IA 0, OA 18 7,634.0 7,634.0 3/3/2022 01:45 3/3/2022 03:21 1.60 PROD1, WHPST TRIP P Perform dry drift clean down to TD 7,634', POOH 7,634.0 73.8 Rig: NABORS CDR3-AC RIG RELEASE DATE 3/11/2022 Page 7/13 2W-09 Report Printed: 3/29/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 3/3/2022 03:21 3/3/2022 04:33 1.20 PROD1, WHPST BHAH P At surface, spaceout, PUD milling assembly BHA #10, LD and inspect *** Note: Gauge DSM 2.73 go, DSR 2.74 go 73.8 0.0 3/3/2022 04:33 3/3/2022 05:03 0.50 PROD1, WHPST BHAH P MU and load build assembly BHA #11 0.0 0.0 3/3/2022 05:03 3/3/2022 05:51 0.80 PROD1, WHPST CIRC P Stab injector, jet stack, unstab injector 0.0 0.0 3/3/2022 05:51 3/3/2022 07:27 1.60 PROD1, DRILL BHAH P PD, build assembly, 2.5 ° AKO motor overa HCC Dynamus bit. 0.0 72.2 3/3/2022 07:27 3/3/2022 08:45 1.30 PROD1, DRILL TRIP P RIH w build assembly 72.2 7,270.0 3/3/2022 08:45 3/3/2022 08:57 0.20 PROD1, DRILL DLOG P Tie into the K1 for -20', PU Wt 30 k lbs, close EDC. 7,270.0 7,268.0 3/3/2022 08:57 3/3/2022 09:09 0.20 PROD1, DRILL TRIP P Continue to RIH, stacked out @ 7,495' bounced though. GLM #11 7,268.0 7,634.0 3/3/2022 09:09 3/3/2022 10:57 1.80 PROD1, DRILL DRLG P set paparmeters, OA 0, IA 15, WH 306 psi, CT 4401 psi @ 1.82 bpm in and out. Free spin diff 535 psi, BHP 3740 psi targetting 11.8 EMW. OBD, CT Wt 7.4 k lbs, WOB 3.6 k lbs. Start mud swap ** New mud at the bit 7699' 7,634.0 7,698.0 3/3/2022 10:57 3/3/2022 12:45 1.80 PROD1, DRILL DRLG P PU Wt 34 k lbs, harvest new parameters, CT 3891 psi @ 1.80 bpm in and 1.75 bpm out, Free spin 574 psi, BHP 3700 psi, CT Wt 12 k. On a hard spot, 7,690' broke out an found sand 7,700' ** TD build @ 7,798' 7,698.0 7,798.0 3/3/2022 12:45 3/3/2022 15:09 2.40 PROD1, DRILL TRIP P PU 33 k lbs, loiter in build for 5x5 to exit the bit Jog the 7" up down up park and open EDC, RBIH to jet 7" POOH 7,798.0 70.0 3/3/2022 15:09 3/3/2022 16:33 1.40 PROD1, DRILL PULD P PUD BHA #11 *** Note: Bit grade 2-3-BT-A-X-I-PN- BHA 70.0 0.0 3/3/2022 16:33 3/3/2022 18:03 1.50 PROD1, DRILL PULD P PD BHA #12, agitator, 0.5 ° AKO motor over a HCC bit. 0.0 78.3 3/3/2022 18:03 3/3/2022 19:33 1.50 PROD1, DRILL TRIP P Tag up, reset counter depths, RIH 78.3 7,250.0 3/3/2022 19:33 3/3/2022 19:42 0.15 PROD1, DRILL DLOG P Log the K1 marker for depth control, minus 20' correction 7,250.0 7,301.0 3/3/2022 19:42 3/3/2022 19:54 0.20 PROD1, DRILL TRIP P Contiinue IH, weight check @ 7,500' 32k CTSW 7,301.0 7,630.0 3/3/2022 19:54 3/3/2022 20:03 0.15 PROD1, DRILL DLOG P Log RA marker for official depth, 7,612.5' 7,630.0 7,630.0 3/3/2022 20:03 3/3/2022 22:03 2.00 PROD1, DRILL DRLG P Obtain pumping parameters, OBD, 1.80 bpm/4,211 psi, FS Diff 960 psi, WHP 309, WHP 3,699, IA 0, OA 11 ***Note:AVG ROP 30 fph to 7,853', increasing to 118 fph AVG 7,798.0 7,868.0 3/3/2022 22:03 3/4/2022 00:00 1.95 PROD1, DRILL DRLG P OBD, 1.8 bpm/4,613 psi, WHP 330, BHP 3,759, IA 0, OA 13 7,868.0 8,051.0 3/4/2022 00:00 3/4/2022 00:30 0.50 PROD1, DRILL DRLG P OBD, 1.8 bpm/4,488 psi, WHP 349, BHP 3,766, IA 0, OA 13 8,051.0 8,081.0 3/4/2022 00:30 3/4/2022 00:45 0.25 PROD1, DRILL WPRT P Stack out 4k DHWOB, brake through, loose all returns, PUW 39 k CTSW, -0.5 DHWOB, continue up hole, pull early wiper up to below the window 8,081.0 7,630.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 3/11/2022 Page 8/13 2W-09 Report Printed: 3/29/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 3/4/2022 00:45 3/4/2022 01:00 0.25 PROD1, DRILL WPRT P Wiper back in hole, RIW 13 k CTSW 7,630.0 8,081.0 3/4/2022 01:00 3/4/2022 03:00 2.00 PROD1, DRILL DRLG P BOBD, 1.8 bpm/4,182 psi, MM/In 1.8 bpm, MM/Out 0,0, WHP 606, BHP 3,711, IA 0, OA 13, returns slowly healing up. *** Note: MM/In 1.78 bpm MM/Out 0.64 8,081.0 8,327.0 3/4/2022 03:00 3/4/2022 04:30 1.50 PROD1, DRILL DRLG P OBD, 1.8 bpm/4,595 psi, MM/in 1.8 bpm, MM/Out 1.18, WHP 415, BHP 3,758, IA 0, OA 13 8,327.0 8,480.0 3/4/2022 04:30 3/4/2022 05:42 1.20 PROD1, DRILL WPRT P Wiper up hole PUW 35 k lbs Hole, build and window clean. Jet 7' with multiple passes spinning the bit. 8,480.0 7,250.0 3/4/2022 05:42 3/4/2022 05:48 0.10 PROD1, DRILL DLOG P Tie into the K1 for a +3' correction 7,250.0 7,279.1 3/4/2022 05:48 3/4/2022 06:18 0.50 PROD1, DRILL TRIP P RBIH, window build and hole clean. 7,279.1 8,480.0 3/4/2022 06:18 3/4/2022 07:00 0.70 PROD1, DRILL DRLG P Set parameters, OA 14 psi, IA 0 psi, WH 400 psi, CT 4369 psi, @ 1.80 bpm in and 1.22 bpm out, BHP 3,652 psi. CT Wt 7.8 k lbs WOB 2.6 k lbs. free spin diff 904 psi Adjust window pressure target to 11.7 - Wellworc holing 11.58 ppg Losses increased 8,480.0 8,548.0 3/4/2022 07:00 3/4/2022 07:48 0.80 PROD1, DRILL WPRT P PU Wt 38 k - pull short BHA wiper, 100% losses Loses slowly healed, targeting ~ 300 psi welhead, giving 11.26 ppg EMW PU to 8060, clena hole, RBIH slowly. returns fluctuating between 0.6 and 0.9 bpm. 8,548.0 8,548.0 3/4/2022 07:48 3/4/2022 12:48 5.00 PROD1, DRILL DRLG P CT 4,500 psi at 1.80 bpm in and 0.5-0.9 bpm out, free spin diff 894 psi, BHP 3603 psi. CT Wt 11 k, drill 50' PU 35 k lbs, BHA wiper, RBIH and drill to 8650' PU Wt 35k, BHA wiper, RBIH, drill ahead. 8,548.0 8,915.0 3/4/2022 12:48 3/4/2022 13:06 0.30 PROD1, DRILL WPRT P PU Wt 36k lbs, PUH on 800' wiper trip Clean trip 8,915.0 8,900.0 3/4/2022 13:06 3/4/2022 13:24 0.30 PROD1, DRILL WPRT P RBIH CT Wt 11 - 10 k lbs 8,900.0 8,915.0 3/4/2022 13:24 3/4/2022 16:18 2.90 PROD1, DRILL DRLG P Set parameters, OA 15 psi, IA 0 psi, WH 230 psi, CT 4095 psi, @ 1.82 bpm in and 1.45 bpm out. Free spin 840 psi, BHP 3661 psi, RIH Wt 10.7 k lbs. OBD, CT Wt 6.5 k lbs, WOB 1.7 k lsb ROP 200 ft/hr PU Wt 36 k lbs bypass high pressure screens - add 1 ppb to high vis pill pit. 8,915.0 9,245.0 3/4/2022 16:18 3/4/2022 17:12 0.90 PROD1, DRILL WPRT P PU Wt 35 k lbs, PUH on wiper to the window, chase 10x10 sweep out of hole, jog build and chase 5x5 sweep through the window. - clean trip 9,245.0 7,685.0 3/4/2022 17:12 3/4/2022 17:24 0.20 PROD1, DRILL WPRT P Pull through window clean, at the TOWS 7,609', overpull 6 k CTSW (42k), minus 1.3 k DHWOB 7,685.0 7,609.0 3/4/2022 17:24 3/4/2022 18:24 1.00 PROD1, DRILL WPRT P Jog 7" x 6 w/sweeps, lower pump rate 1.25 bpm 4,190 psi, pull up through the tubing tail clean 7,609.0 7,250.0 3/4/2022 18:24 3/4/2022 18:36 0.20 PROD1, DRILL DLOG P Log the K1 for depth control, + 6.0' 7,250.0 7,275.0 3/4/2022 18:36 3/4/2022 19:36 1.00 PROD1, DRILL WPRT P Wiper back in hole, RIW 13 k 7,275.0 9,245.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 3/11/2022 Page 9/13 2W-09 Report Printed: 3/29/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 3/4/2022 19:36 3/4/2022 21:36 2.00 PROD1, DRILL DRLG P BOBD, 1.8 bpm/4,209 psi, MM/in 1.86 bpm, MM/Out 1.38 bpm, WHP 293, BHP 3,755 psi, IA 0, OA 14 9,245.0 9,379.0 3/4/2022 21:36 3/4/2022 23:36 2.00 PROD1, DRILL DRLG P OBD, 9,379', 1.82 bpm/4,368 psi, -3.0k CTSW, 1.3 k DHWOB, MM/Out 1.49 bpm, WHP 257, BHP 3,763, IA 0, OA 15, PUW 39 k CTSW *** Note: On beaded pills 5 & 10 bbl 9,379.0 9,468.0 3/4/2022 23:36 3/4/2022 23:48 0.20 PROD1, DRILL DRLG P OBD, 9,468', 1.83 bpm/4,262 psi, -2.0k CTSW, 900k DHWOB, MM/Out 1.52, WHP 267, BHP 3,779, IA 0, OA 16 9,468.0 9,472.0 3/4/2022 23:48 3/5/2022 00:00 0.20 PROD1, DRILL P Wiper up hole, friction out @ 9,383', hesitate for beads to get to the bit. 9,472.0 9,386.0 3/5/2022 00:00 3/5/2022 00:12 0.20 PROD1, DRILL WPRT P Beads at the bit, Continue IH 20 fpm. 9,386.0 9,472.0 3/5/2022 00:12 3/5/2022 00:54 0.70 PROD1, DRILL DRLG P 9,472', BOBD, MM/Out 1.34 bpm, 1.86 bpm/3,683 psi, WHP 258, BHP 3,777, IA 0, OA 16 9,472.0 9,523.0 3/5/2022 00:54 3/5/2022 02:54 2.00 PROD1, DRILL DRLG P 9,523', returns drop to 55% losses, continue drilling ahead, 1.85 bpm/4,478 psi, WHP 439, BHP 3,747, IA 0, OA 17 *** Note: Returns coming back slowly, pumping 5 bbl beaded pill every 25-30 bbl of non-beaded fluid. 9,523.0 9,665.0 3/5/2022 02:54 3/5/2022 03:24 0.50 PROD1, DRILL DRLG P OBD, 1.83 bpm/4,608 psi, MM/Out 1.50 bpm, WHP 249, BHP 3,796, IA 0., OA 17 Pumping 5 bbl beaded pills every 25-30 bbl of non-beaded fluid, 9,665.0 9,700.0 3/5/2022 03:24 3/5/2022 03:42 0.30 PROD1, DRILL WPRT P Wiper up hole PUW 39 k CTSW (800') 9,700.0 8,900.0 3/5/2022 03:42 3/5/2022 04:12 0.50 PROD1, DRILL WPRT P Wiper back in hole, RIW 0-3 k CTSW 8,900.0 9,700.0 3/5/2022 04:12 3/5/2022 08:18 4.10 PROD1, DRILL DRLG P BOBD, 1.88 bpm/4,400 psi, MM/Out 1.65 bpm, WHP 215, BHP 3,818, IA 0., OA 17 Pumping 5 bbl beaded pills every 25-30 bbl of non-beaded fluid, Drilling break ~ 9955 and 100% losses 9,700.0 9,965.0 3/5/2022 08:18 3/5/2022 08:48 0.50 PROD1, DRILL WPRT P PU while losses heal - PU Wt 41 k lbs, PUH slowly ~10-15 ft/min while losses heal. Target ~350 psi surface pressure returns increase to 1 bpm + returned to drilling Drilled ahead in fast sands to 9982 complete losses 9,965.0 9,982.0 3/5/2022 08:48 3/5/2022 11:36 2.80 PROD1, DRILL DRLG P Set parameters, OA 18, IA 0 WH 305 psi, CT 4349 psi, @ 1.89 bpm in and 0.88 bpm out. Free spin 850 psi. OBD CT Wt 0 k lbs, WOB 1 k lbs, ROP 100 ft/ hr. Struggling to turn around now, need to have beads to turn around. 9,982.0 10,028.0 3/5/2022 11:36 3/5/2022 11:51 0.25 PROD1, DRILL WPRT P PU 43 k lsb - full losses, pull 800' wiper #2 10,028.0 9,768.0 3/5/2022 11:51 3/5/2022 12:09 0.30 PROD1, DRILL WPRT P RBIH 9,768.0 10,028.0 3/5/2022 12:09 3/5/2022 18:09 6.00 PROD1, DRILL WPRT P BOBD, CT 4778 psi @ 1.86 bpm in and 1-1.4 bpm out. Free spin 908 psi. CT Wt 0 to -2 k lbs.pumping 5-10 bbls 1 ppb beads every ~20 min 10,028.0 10,260.0 3/5/2022 18:09 3/5/2022 18:39 0.50 PROD1, DRILL DRLG P OBD, 1.86 bpm/4,447 psi, MM/out 1.42 bpm, WHP 363, BHP 3,799, IA 0, OA 20 10,260.0 10,298.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 3/11/2022 Page 10/13 2W-09 Report Printed: 3/29/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 3/5/2022 18:39 3/5/2022 21:09 2.50 PROD1, DRILL DRLG P Loss of differientual pressxure, pull BHA wiper, lower pump rate 1.5 bpm/3,470 psi/560 psi, WHP 375, BHP 3,773, IA 0, OA 20 10,298.0 10,359.0 3/5/2022 21:09 3/5/2022 22:09 1.00 PROD1, DRILL WPRT P Wiper to the window PUW 41 k CTSW, chasing sweeps 10,359.0 7,613.0 3/5/2022 22:09 3/5/2022 22:54 0.75 PROD1, DRILL WPRT P Pull through window clean, jog the 7" x 5 with sweeps 7,613.0 7,555.0 3/5/2022 22:54 3/5/2022 23:06 0.20 PROD1, DRILL WPRT P PUH to log formation 7,555.0 7,240.0 3/5/2022 23:06 3/5/2022 23:18 0.20 PROD1, DRILL DLOG P Log the K1 marker for depth control correction of + 10.0' 7,240.0 7,274.0 3/5/2022 23:18 3/6/2022 00:00 0.70 PROD1, DRILL WPRT P Wiper back in hole clean through window and build section, RIW 12 k 7,274.0 9,037.0 3/6/2022 00:00 3/6/2022 01:00 1.00 PROD1, DRILL WPRT P 9,037', Continue wiper in hole, RIW 8 k to minus 1 k CTSW 9,037.0 10,359.0 3/6/2022 01:00 3/6/2022 01:30 0.50 PROD1, DRILL WPRT P Continue IH trying to find bottom, 1.75 bpm/4,410 psi, MM/out 1.44 bpm, WHP 288, BHP 3,917, IA 0, OA 18 Munipulate pump rate difficultly sliding in, PUH, pull 73 k CTSW to pull free, Differential Sticking, Pull 200' wiper up hole. 10,359.0 10,359.0 3/6/2022 01:30 3/6/2022 03:30 2.00 PROD1, DRILL DRLG P OBD, 1.81 bpm/4,426 psi, MM/out 1.24 bpm, WHP 306, BHP 3,834, IA 0, OA 18 10,359.0 10,436.0 3/6/2022 03:30 3/6/2022 06:48 3.30 PROD1, DRILL DRLG P OBD, 1.77 bpm/4,309 psi, MM/out 1.34 bpm, WHP 322, BHP 3,840, IA 0, OA 18 10,436.0 10,534.6 3/6/2022 06:48 3/6/2022 07:06 0.30 PROD1, DRILL WPRT P BHA wiper, PU Wt 38 k lbs RBIH 10,534.6 10,534.6 3/6/2022 07:06 3/6/2022 13:00 5.90 PROD1, DRILL DRLG P OA 19 psi, IA 0 psi, WH 270 psi, CT 4328 psi @ 1.84 bpm in an 1.49 bpm out. Free spin 926, BHP 3849 psi, window 11.58 ppg EMW, 12. 3 ppg @ the bit. OBD Ct Wt -1 k lbs WOB 0.97 k lbs. 10,534.6 10,672.0 3/6/2022 13:00 3/6/2022 14:00 1.00 PROD1, DRILL WPRT P PU on wiper #1 PU Wt 39 k lbs drug up to 41 k Wiper to 9,000' 10,500 - 10,260 saw coil wt to 53 k lbs, - WOB to -3 k lbs drug low side Some pack off events 10,672.0 8,960.0 3/6/2022 14:00 3/6/2022 15:30 1.50 PROD1, DRILL WPRT P RBIH Start at 8 k CT Wt and 40 ft/min, CTwt gone by 10,300' and RIH speed down to a crawl Clean trip 8,960.0 10,672.0 3/6/2022 15:30 3/6/2022 18:00 2.50 PROD1, DRILL DRLG P Set parameters, OA 19 psi, IA 0 psi, WH 315 CT 4670 @ 1.89 bpm in and 1.54 bpm out. free spin 900 psi, BHP 3862 psi, CT Wt 0 k lbs, WOB 0.88 k lbs 10,672.0 10,768.0 3/6/2022 18:00 3/6/2022 19:00 1.00 PROD1, DRILL DRLG P OBD, 1.89 bpm/4,732 psi, MM/out 1.50 bpm, WHP 286, BHP 3872, IA 0, OA 19 PUW's 59 k CTSW 10,768.0 10,807.0 3/6/2022 19:00 3/6/2022 21:00 2.00 PROD1, DRILL DRLG P OBD, 1.82 bpm/4,637 psi, MM/out 1.40 bpm, WHP 279, BHP 3885, IA 0, OA 19 PUW's 61 k CTSW 10,807.0 10,837.0 3/6/2022 21:00 3/6/2022 23:00 2.00 PROD1, DRILL DRLG P OBD, 1.86 bpm/4,651 psi, MM/out 1.44 bpm, WHP 284, BHP 3881, IA 0, OA 19 PUW's 10,837.0 10,879.0 3/6/2022 23:00 3/7/2022 00:00 1.00 PROD1, DRILL DRLG P OBD, 1.81 bpm/4,671 psi, MM/out 1.42, bpm,. WHP 296, BHP 3,887, IA 0, OA 19 10,879.0 10,900.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 3/11/2022 Page 11/13 2W-09 Report Printed: 3/29/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 3/7/2022 00:00 3/7/2022 00:30 0.50 PROD1, DRILL DRLG P OBD, 1.84 bpm/4,605 psi, MM/out 1.50, WHP 304, BHP 3,877, IA 0, OA 19 Drilling on 5-10 bbl beaded/Lube/DrillZone pills 10,900.0 10,913.0 3/7/2022 00:30 3/7/2022 00:45 0.25 PROD1, DRILL WPRT P 100' wiper up hole, PUW 60 k, RBIH, RIW 2 k CTSW on beads 10,913.0 10,913.0 3/7/2022 00:45 3/7/2022 01:00 0.25 PROD1, DRILL DRLG P BOBD, 1.87 bpm/4,663 psi, MM/out 1.52, WHP 269, BHP 3,881, IA 0, OA 19 Drilling on 5-10 bbl beaded pills 10,913.0 10,929.0 3/7/2022 01:00 3/7/2022 01:15 0.25 PROD1, DRILL WPRT P 100' wiper up hole, PUW 62 k CTSW, RBIH on beads 10,929.0 10,929.0 3/7/2022 01:15 3/7/2022 04:15 3.00 PROD1, DRILL DRLG P BOBD, 1.89 bpm/4,811 psi, MM/out 1.42 bpm, WHP 281, BHP 3924, IA 0, OA 19 Drilling on 15 bbl beaded pills 10,929.0 11,050.0 3/7/2022 04:15 3/7/2022 05:45 1.50 PROD1, DRILL WPRT P Wiper to the window, clean PU 46 k CTSW One lslight tug 356 k to 43 k CT wt @ 10,560' - other than that clean trip. 11,050.0 7,605.0 3/7/2022 05:45 3/7/2022 06:15 0.50 PROD1, DRILL WPRT P Jet 7" 7,555' to 7,585', PUH to log K1 7,605.0 7,200.0 3/7/2022 06:15 3/7/2022 06:27 0.20 PROD1, DRILL WPRT P Log the K1 for depth control, correction of +17' 7,200.0 7,280.7 3/7/2022 06:27 3/7/2022 08:03 1.60 PROD1, DRILL WPRT P Wiper back in hole,window and build clean. CT Wt 13k diminishing to 6 K lbs at bottom Rode in on 20 bls of beads exiting the bit at ~10,000 with reduced pump rate to 0.9 bpm. Carried 50 -45 ft/minute running speed till set downs at 10,580' and 10,570' in the fault A5/A6 wraped gamma transition zone. 7,280.7 11,050.0 3/7/2022 08:03 3/7/2022 15:15 7.20 PROD1, DRILL DRLG P Set parameters, OA 19 psi, IA 0 psi, WH 230 psi, CT 4672 psi at 1.86 bm in and 1.53 bpm out. Free spin diff 833 psi, BHP 3958 with 11.66 emw at the window and 12.59 ppg at the bit. OBD Ct wt -1 to 1 k lbs, WOB 0.9, ROP 30 - 100 ft/ hr. 11,050.0 11,295.0 3/7/2022 15:15 3/7/2022 18:33 3.30 PROD1, DRILL WPRT P Geos called TD early, PU Wt 38 k lbs, Pull slow once broke over waiting on construction of high vis sweep. RBIH to bottom, as 10x10 exits, PUH at 40 ft/min dragging low side pumping 1.91 bpm. Clean Ct Wt 35 k lbs, Pulled 16 k over on CT wt and -6 k WOB from 10,580 - 10,500'. Jogged the build sectin while 10x10 sweep exited, pulled through the window clean. * * TD 11,295, called early by Geo's. - unconfirmed. 11,295.0 7,566.0 3/7/2022 18:33 3/7/2022 21:09 2.60 PROD1, DRILL WPRT P Jog 7" casing from WS to TT while chasing last 10 x10 sweep to surface. 7,566.0 60.0 3/7/2022 21:09 3/7/2022 22:39 1.50 PROD1, DRILL TRIP P RBIH 60.0 7,250.0 3/7/2022 22:39 3/7/2022 22:51 0.20 PROD1, DRILL DLOG P Tie into the K1 for a -18', PU Wt 30 k lbs. 7,250.0 7,279.9 3/7/2022 22:51 3/7/2022 23:21 0.50 PROD1, DRILL TRIP P Continue in hole and park @ 7550.05 MD 5935.43 TVD Close the choke and trap 11.6 ppg EMW - 3,575 psi. Observed pressure bleed to 3,375 psi - 11.0 ppg EMW 7,279.9 7,550.1 3/7/2022 23:21 3/8/2022 00:00 0.65 PROD1, DRILL TRIP P Set down 7,612', PU and run in clean. Midnight depth 8800' 7,550.1 8,750.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 3/11/2022 Page 12/13 2W-09 Report Printed: 3/29/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 3/8/2022 00:00 3/8/2022 01:45 1.75 PROD1, DRILL TRIP P Set down 7,612', PU and run in clean. Midnight depth 8800' Line up and start beaded pill to assist weight transfer to confirm TD 8,750.0 11,295.0 3/8/2022 01:45 3/8/2022 02:30 0.75 PROD1, DRILL TRIP P Confirm TD 11,295', PUH Heisitate for LRP to finish being built 11,295.0 11,295.0 3/8/2022 02:30 3/8/2022 06:00 3.50 PROD1, DRILL DISP P POOH, laying in beaded 11.2 ppg liner running pill 11,295.0 51.0 3/8/2022 06:00 3/8/2022 06:30 0.50 PROD1, DRILL OWFF P Check well for flow, PJSM *** Note: Static loss rate 6 bph 78.2 78.2 3/8/2022 06:30 3/8/2022 07:30 1.00 PROD1, DRILL BHAH P LD and inspect drilling assembly 4-2-BT-A-X-I-CT-TD 78.2 0.0 3/8/2022 07:30 3/8/2022 08:00 0.50 PROD1, DRILL CTOP P Function test BOPE 0.0 3/8/2022 08:00 3/8/2022 08:30 0.50 COMPZ1, CASING PUTB P Prep RF for liner ops, PJSM 0.0 0.0 3/8/2022 08:30 3/8/2022 11:15 2.75 COMPZ1, CASING PUTB P PU, L1 lower liner segment w/39 joints 0.0 1,196.0 3/8/2022 11:15 3/8/2022 12:00 0.75 COMPZ1, CASING BHAH P PU BHI CoilTrak Tools 1,196.0 1,239.9 3/8/2022 12:00 3/8/2022 13:48 1.80 COMPZ1, CASING RUNL P MU INJH, tag up, reset counters, RIH w/liner segment #1 39 joints, non ported bullnose, and OH QCLL Liner Latch. 1,239.9 7,565.0 3/8/2022 13:48 3/8/2022 15:48 2.00 COMPZ1, CASING RUNL P Correct to the EOP flag, - 25.6, PUW 34 k, Continue IH 7,565.0 11,295.0 3/8/2022 15:48 3/8/2022 16:00 0.20 COMPZ1, CASING RUNL P Set down on bottom, PUW 41 k, set back down, bring pump online 1.5 bpm/Diff 1,086 psi, PUW 34 k 11,295.0 11,295.0 3/8/2022 16:00 3/8/2022 18:12 2.20 COMPZ1, CASING CTOP P Heistate for second LRP, Recep pipe in open hole, while building pill 11,295.0 10,099.0 3/8/2022 18:12 3/8/2022 20:48 2.60 COMPZ1, CASING TRIP P POOH, laying in beaded 11.2 ppg LRP up to 6900'. Paint flags @ 7150 & 4600 10,099.0 14.0 3/8/2022 20:48 3/8/2022 21:48 1.00 COMPZ1, CASING PULD P At surface, Flow check well, Lay down BHA #13 Liner running tools 14.0 0.0 3/8/2022 21:48 3/8/2022 22:12 0.40 COMPZ1, CASING RURD P Prep floor to run liner, BHA #14 0.0 0.0 3/8/2022 22:12 3/9/2022 00:00 1.80 COMPZ1, CASING PUTB P P/U BHA #14 with disolvable bullnore, 79 Jts slotted liner, 15 Jts blank liner, 6' pup, and 6' seal bore depoloyment sleeve, 30 JTs in hole @ midnight 0.0 900.0 3/9/2022 00:00 3/9/2022 04:00 4.00 COMPZ1, CASING PUTB P Continue picking up L1 upper liner segment 900.0 2,943.0 3/9/2022 04:00 3/9/2022 04:48 0.80 COMPZ1, CASING PULD P All liner in well, Make up coil track, Swap out floats on UQC. Make up coil and surface test 2,943.0 2,943.0 3/9/2022 04:48 3/9/2022 06:48 2.00 COMPZ1, CASING TRIP P Trip in hole BHA #14, correct to EOP - 21' PUW 34 k 2,943.0 10,099.0 3/9/2022 06:48 3/9/2022 07:18 0.50 COMPZ1, CASING TRIP P Liner on bottom, PUW 42 k, -11k DHWOB, Set back down, bring pump online 1.5 bpm/1,043 psi diff, PUW 29 k, -1k DHWOB, PUH 50', remove liner from counters. 10,099.0 7,199.6 3/9/2022 07:18 3/9/2022 08:03 0.75 DEMOB, WHDBOP DISP P Recep pipe circulating SW to GS 7,199.6 7,150.0 3/9/2022 08:03 3/9/2022 10:03 2.00 DEMOB, WHDBOP DISP P POOH, displacing well to SW 7,150.0 5,147.0 3/9/2022 10:03 3/9/2022 10:48 0.75 DEMOB, WHDBOP DISP P PJSM with LRS and rig crew, spot in equipment, RU/PT hose 3,500 psi 5,147.0 5,147.0 3/9/2022 10:48 3/9/2022 12:18 1.50 DEMOB, WHDBOP FRZP P Line up and load coil with 39 bbls of deisel, while POOH 5,147.0 43.4 Rig: NABORS CDR3-AC RIG RELEASE DATE 3/11/2022 RIH,gp, , w/liner segment #1 39 joints, non portedgj,p bullnose, and OH QCLL Liner Latch. All liner in wel POOH, laying in beaded 11.2 ppg LRP Liner on bottom, Heistate for second LRP, Confirm TD 11,295', Set down on bottom, P/U BHA #14 with disolvable bullnore,, 79 Jts slotted liner, 15 Jts blank liner, 6', pup, and 6' seal bore depoloymentpp, sleeve, Page 13/13 2W-09 Report Printed: 3/29/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 3/9/2022 12:18 3/9/2022 14:18 2.00 DEMOB, WHDBOP BHAH P At surface, tag up, space out, PJSM, PUD and LD setting tools 43.4 0.0 3/9/2022 14:18 3/9/2022 16:18 2.00 DEMOB, WHDBOP CTOP P MU, nozzle, stab INJH PJSM w/HES N2 and rig crew Come online 1,500 SCF/15 mins 0.0 0.0 3/9/2022 16:18 3/9/2022 18:00 1.70 DEMOB, WHDBOP CTOP P Bleed down Coil, RD HES N2 0.0 0.0 3/9/2022 18:00 3/9/2022 20:00 2.00 DEMOB, WHDBOP CTOP P Crew change, Cut CTC, Install grapple connector, Pull test to 2500 Lbs. 0.0 0.0 3/9/2022 20:00 3/9/2022 21:30 1.50 DEMOB, WHDBOP CTOP P PJSM, Remove inner reel iron / pressure bulkhead. 0.0 0.0 3/9/2022 21:30 3/9/2022 23:00 1.50 DEMOB, WHDBOP CTOP P PJSM, R/U unstabbing gear. Unstab CT and pull back to spool 0.0 0.0 3/9/2022 23:00 3/10/2022 00:00 1.00 DEMOB, WHDBOP CTOP P Trim and secure CT to spool, Remove saddle clamps. Rig up CT Kevlar sling. Lift reel out of saddles. Clean up hub and shim area on reel stand 0.0 0.0 3/10/2022 00:00 3/10/2022 01:30 1.50 DEMOB, WHDBOP CTOP P PJSM w / NES to lower reel on flatbed. Swap out flatbeds. Hoist storage reel into saddles and secure 0.0 0.0 3/10/2022 01:30 3/10/2022 02:00 0.50 DEMOB, WHDBOP CTOP P Close bomb bay doors, Install king pin. Start working saddle clamps 0.0 0.0 3/10/2022 02:00 3/10/2022 06:00 4.00 DEMOB, WHDBOP CTOP P PJSM, Plan forwrward install shims in spool. Install saddle clamps. Remove snow form inside reel core and outside. Knock TT line off rig 0.0 0.0 3/10/2022 06:00 3/10/2022 12:00 6.00 DEMOB, WHDBOP CTOP P Finish shimming reel, and torque on hubs, replace all 2" gaskets on iron, Install Inner Reel Iron, prep to install e- line bulkhead. 0.0 0.0 3/10/2022 12:00 3/10/2022 18:00 6.00 DEMOB, WHDBOP CTOP P Swap out stuffing box brass with new. Mark old brass for previous reel. reinstall stuffing box, Make up stabbing grapple connector. Rig up stabbing cable. Stab coil in injector 0.0 0.0 3/10/2022 18:00 3/11/2022 00:00 6.00 DEMOB, WHDBOP CTOP P Hook up TT line, PT with rig air. Install horse head counter. Skid injector to floor. Rig down stabbing gear. Cut grapple connector. Test wire - Good. Prep coil for internal dimple connector. Install connector and crimp on. Pull test to 35K 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 3/11/2022 ! "# "$%&' 50-029-21235-60 () * ) &$# ) +, ) ) -./ ") "0) !#)"# # $%& '( /) !0 ))*!+, )$%& '( ) ,, * *) 1*) ( 2) **),!-')./ , ( !-'00( 1 2,, 1 , 3% " , 4,, / 44/ /,/ " " &/#) &#) 3 /) /) 435$" 45$ 1#&) & & +1-156&5+ +!51-5&7! &"#3) & -8!96&667 !%8+9+&57+ "0 678 9#/ 6+8 * / 678 ! #*/ :;;"! <+< !+& 5&- +-1&++7-- ), ) # ) / ! !& * ,) 9*6+,8 6 8 45$ 6 8 678 435$" 6 8 +: )-17& !&&&%& 9* 6 8 /* +*6"08 + 6 8 6<+< ;*" /2, #= 4 ;*# , 2!& -17& '(!<!7<!!> "0; 0;" -17+& !!1+& !' !(6<+<!!>!+> 6 8 ; 678 < 678 435$" 6 8 45$ 6 8 +, 6 8 +, 6 8 / 6 8 3 / 6 8 , 6 8 & 675'=8 +* -17& 67&5 +&6+ 71!%& !155&7 617%5&+1& +15!157%&! +!+1!6&! !&% !1-&6 "0;'( +$$ *"$% -17+& 67&! +&67 71!5& !15& 617+&+1%& +15!157+&% +!+1!-&% !&% !15&!- "0;'( :$+ " -176%&7 %%&7 +&% 71%&5 !15& 61775&!+1%7&5 +15!15-6&+ +!+1!!&! -& !166&% "0;'( ; #<* -177+&! +5&!7 & 71+& !15&+ 6175&+17+& +15!155& +!+155&6 %7&6 !165&- "0;'( ; #<* -17+&+ 75&+% 57&7! 71-6&+ !1!-&% 61-!+&++1-&+ +15!15!&5 +!+17&- 6-&7 !1%6&! "0;'( -1-+&- 5&% &+ 715!&- !1-& 61-%&5+15-&- +15!1!&+ +!+16+&% %&+ !1%5& "0;'( -1-++&+ & 6&7! 7156&- !1%&+ 61-7&6+15&- +15!1!%&- +!+15&5 %5&+ !1+7&% "0;'( -1--+&! 5&7 6&% 715!& !1+!&7 61-5+&+15-& +15!1+&5 +!%1& ++& !17%&75 "0;'( -1-5&- !&6% 6!-&5 71-5& !17-&- 615&!+15%& +15!1%!&5 +!%1-7& 6+& !1--&+5 "0;'( () * ) &$# ) +, ) ) -./ ") "0) !#)"# # $%& '( /) !0 ))*!+, )$%& '( ) ,, * 6 8 ; 678 < 678 435$" 6 8 45$ 6 8 +, 6 8 +, 6 8 / 6 8 3 / 6 8 , 6 8 & 675'=8 +* -15& !& 6& 71-&7 !1&+ 615!&-+1-5&7 +15!17%&7 +!%1+7&% !& !17&76 "0;'( -15+&! !& 66&+ 717-&6 1!6&5 6156&-+1-6&6 +15!15-&5 +!%165&6 5&7 !16!7&% "0;'( -155&+ &6! 6+&+! 717&! 165& 615+-&!+175&! +151!&! +!%1&5 -&! !166-&% "0;'( -1!& -&%6 6-&!! 71+-&5 17&7 615-6&%+176&5 +15167&+ +!%1%&+ 5&6 !16+5&77 "0;'( -1%5&7 +&77 6&-% 71+%&+ 15-&% 61555&7+17&+ +1517!&6 +!%155&! !&- !165&%5 "0;'( -1-&6 !&77 6&+6 71+&+ 1!!6& 61%&!+1+5&+ +1515-&5 +!%15-6&7 !6& !1%6&5% "0;'( 515& !&! 6&+ 71+!&5 1!6&% 61!&+1+-&5 +151!!6& +!%15+5&7 &7 !1%7&6- "0;'( 5165& & 666& 71+!& 1!7+&5 6166&%+1+-& +151!6&+ +!%15%%& !&5 !1%%&5+ "0;'( 517& 6&-5 66%& 71%&+ 1!& 61%7&5+1++&+ +151!77&7 +!%156&- 7& !1%-%&% "0;'( 51&6 6&+ 665&57 71%-&+ 1&% 61+5&5+1+6&+ +151!%&! +!%15!5&- !+&% !1%&5 "0;'( 51!6!& %&!+ 6%!&% 71%+&% 1+&% 617&7+1+!&% +151%&! +!%15-&5 5& !1+7&! "0;'( 51!+& %&!+ 6%&%5 71%6&% 1-7&5 61-5&-+1%&% +151+&% +!%1-5&7 6&6 !1++!&6! "0;'( 51!5&% !& 6%&% 71%!&5 16+&! 6155&5+1%-&5 +151-5&- +!%1-55&% -&+ !1+--&%7 "0;'( 51!&6 !& 665&6 71%&5 1666&! 61&%+1%7&5 +15167&- +!%1---&- 7&- !176&!5 "0;'( 51%&! !&! 667&-5 71%& 167&7 %1!&5+1%7& +15166%& +!%1-77&6 +&- !175& "0;'( 51-&- !&%! 66%&7- 716&6 1655&+ %16&%+1%+&6 +15167& +!%1-+6&7 -& !17+6&+5 "0;'( 516&5 !&6+ 66&!+ 7165&7 1%!+&% %167&+1%%&7 +151655& +!%1-%&! 5&% !17--&-% "0;'( 516%& !& 6&5! 716-& 1%%&7 %1+&+1%6& +151%!7&! +!%1-%& -&+ !1-!&5 "0;'( 5167&! &-! 6-&% 716-&% 1%77&- %177&-+1%6&% +151%%&! +!%1-!& 5&5 !1-6&7 "0;'( 516-&5 & 65&-- 716-& 1%!& %15!&5+1%6& +151%7%&% +!%17+& +&6 !1-%%&65 "0;'( 51%&+ !&6 66!&7+ 7167&5 1+!5&7 %1-&7+1%&5 +151%!& +!%17-&! &- !1-75&-5 "0;'( 51%7& !& 66+&6 7167& 1+%+&5 %1!!!&6+1%& +151+!&! +!%177+&% !!&6 !1-6& "0;'( 51%&6 !&- 665&% 716+& 1+-6&- %1!6&!+1%!& +151+%7& +!%17+6&+ !6& !15!5&7 "0;'( 51+& &%7 6%!&%6 716%&5 17!&- %1!66&+1%&5 +151+-+& +!%17%6&6 5&7 !15%%&% "0;'( 51++&+ & 6%6&5! 716%&! 176&- %1!%&6+1%&! +15176& +!%176%& &% !15-!&% "0;'( 51+5&! 6&! 6%7&% 716&5 17+&6 %1!%&+165&5 +15176&+ +!%177&+ 5& !155&- "0;'( 517+&5 6&-5 6%5& 716!&6 175%&6 %1!++&7+16-&6 +1517+-&+ +!%17&- -&+ !1!&! "0;'( 517%& 6&6 6+!&!5 71& 1-!5&- %1!7!&+16+& +1517!&5 +!%17!%&6 &! !1+%&7- "0;'( 517-&7 +&%- 6+6& 717& 1-%5&! %1!7+&5+16& +151-!& +!%17!&% !!& !15&5 "0;'( 51-&+ %&-6 6+7& 71%& 1---&5 %1!75&!+16& +151-+& +!%175& !&6 1!!&5! "0;'( 51-6!&5 %&+ 6+5&-7 71!&5 155& %1!7&6+1-&5 +151-5& +!%177&- 7&! 1%&- "0;'( 51-7&6 &+ 6+&66 71&- 156-&% %1!7&-+17&- +1515!&+ +!%177& !6&+ 1-&6 "0;'( 51-& 55&6 &6+ 71!& 1575&! %1!7&5+1-& +1515%!& +!%177& +&% 1!&% "0;'( 515&! 55&+ 6++&7 71!&- 15-& %1!-&5+1-&- +1515-&6 +!%17%& !7&% 1!5&% "0;'( 515+& 5-&5+ 7&!- 71&- 1-& %1!-&%+15&- +151&! +!%17+&6 6+&% 1!+5&6 "0;'( 5155&7 5+&-6 &7 71%&% 1+-&6 %1!77&6+16&% +1516&% +!%17&6 !!&- 1!55&! "0;'( 51!!&6 5+&%+ !!& 717&5 15-&% %1!7!&+16&5 +1517&+ +!%17!%&+ 7&% 1!&%5 "0;'( 51%& 5-&- !&76 715&+ 61!7&+ %1!++&%+16%&+ +1515&7 +!%17& 5&7 1%&7 "0;'( 51-&5 5&!! 5&+5 71& 61%7& %1!+&++16+& +1561!&! +!%17%& -&5 1-5&7 "0;'( 1&- 57& -&-5 716&6 61-+&+ %1!%7&+167&6 +1561%5&- +!%17&! -& 165&5% "0;'( () * ) &$# ) +, ) ) -./ ") "0) !#)"# # $%& '( /) !0 ))*!+, )$%& '( ) ,, * 6 8 ; 678 < 678 435$" 6 8 45$ 6 8 +, 6 8 +, 6 8 / 6 8 3 / 6 8 , 6 8 & 675'=8 +* 16&+ 57&5- +&7 716!& 61!+& %1!%&-+16-& +1561-5& +!%176&+ -&6 1665&% "0;'( 17&- 5-&6 &%7 7166&% 61!6+& %1!%&7+16&% +1561!5&6 +!%176%&7 !&+ 1675&+% "0;'( 1& 5-&55 6+&-- 716%&- 61!7+&6 %1!%&+1%&- +1561!65&+ +!%176+&! &! 165&6! "0;'( 1!& 5-&- 6+-&+- 716+&- 61!+&6 %1!%&-+1%!&- +1561!75&% +!%176%&6 -&6 1%-&-! "0;'( 1!+&- 57& 6++&!7 716-&! 61+& %1!%&7+1%6&! +1561!5&! +!%176&6 5&5 1%+7&7+ "0;'( 1!5!& 5-&- 6+6&7 7165&+ 61++&! %1!%+&-+1%%&+ +15615& +!%17& -&+ 1%5+&-+ "0;'( 1!&- 55&- 6+&%! 716&7 615%&+ %1!+&+1%+&7 +1561+-&7 +!%17%&5 & 1+!6&- "0;'( 1%&6 5-&7 6%5&% 71%&- 616!6&+ %1!++&6+1%7&- +156157&7 +!%17!&+ +& 1+%!&76 "0;'( 1-&6 55&% 6%7&7% 71%!&- 616%& %1!7!&7+1%-&- +15616!+& +!%17!6& 5&! 1+7&%! "0;'( 16& &-% 6%7&7% 71%!& 616-!& %1!75&++1%-& +15616%+& +!%177&! -&5 1+7&5+ "0;'( 166& !&6 6%5&%% 71%!&% 61%!& %1!-+&+1%-&% +15616-%&6 +!%1+&+ 7& 17%&+- "0;'( 167&! &5 6+&!+ 71%&% 61%6&7 %1!5&7+1%7&% +1561%6&7 +!%1+6& -&5 17+&++ "0;'( 16& &-- 6+&-6 7165& 61%7&6 %1!5+&+1%%& +1561%66&6 +!%1+5&6 5&7 175!&! "0;'( 1%&6 +&- 6+%& 7167& 61%&! %1!55&%+1%& +1561%76&! +!%1+5+&5 &! 1-&-5 "0;'( 1%+&% 7&% 6+-& 7166& 61+& %1!&-+16& +1561%6& +!%1+56&+ !&+ 1-65&57 "0;'( 1%5&- 7&7+ 6+-&5 716&7 61++&! %1!&+167&7 +1561+6&! +!%1+5& 6& 1-75&+ "0;'( 1+!& 5&! 6+&% 717&5 61+-&% %1!&++16&5 +1561++&% +!%1+5!&+ 5&6 1-7& "0;'( 1+%&% 5&6 &6- 71&7 617&6 %1!!&+15&7 +1561+5&6 +!%1+5&! 5& 157&+% "0;'( 1+-&! +&-5 &! 71!& 61765&- %1!&7+1+& +15617!!&- +!%1+56&6 -&5 15++&- "0;'( 17&6 %&- +&!% 71!7&6 61775&- %1!55&++1&6 +15617%!&- +!%1+5+&% 5& 155+&77 "0;'( 176&% &7! 7&5+ 71!%&6 6175&+ %1!5+&6+1&6 +15617-!&+ +!%1+55&% & 1!+&+ "0;'( 177!&- !&77 7&7+ 71!6&! 61-&7 %1!5!&7+1!&! +1561-&7 +!%1+& 6&! 1%7&5 "0;'( 17!& !&7 &+ 71!&6 61-+5&5 %1!--&%+1!5&6 +1561-6!&5 +!%1+7& !!& 1-7&- "0;'( 1-&6 & !&! 71!!&! 61-5-&+ %1!-&6+1!-&! +1561-7&+ +!%17!& %& 61+&%6 "0;'( 1-+&+ &7% !%& 71&7 615!-& %1!77&!+1!+&7 +1561-& +!%17-&% !6&6 616+&+7 "0;'( 1-5&% &+5 !5& 715&6 615%+&+ %1!+-&7+1!%&6 +15615!5&7 +!%17!+&5 !7&% 617+&!+ "0;'( 15!!&% &-6 !& 717& 615-%&5 %1!%-&7+1!& +15615%-& +!%17+&5 &+ 61+&-7 "0;'( 15%&% !&6 !5&66 71+&5 61&6 %1!65&6+1!!&5 +15615-+&% +!%176+& +&% 61!%&% "0;'( 15-&+ !&! !+&-7 71+& 616!&! %1!&%+1!!& +1561%& +!%17%6&- 5&7 61!+%&6 "0;'( 1&+ 5&% !&56 71+& 617& %1!!&7+1!!& +15616+&! +!%17+!&+ !&7 61!57&!+ "0;'( 16&7 !&% !&+5 71%& 615&7 %1!!+&+1!& +15617&- +!%17+-& & 61!%&- "0;'( 17&7 &57 -&57 71%&% %1!& %1!!!&!+1!&% +1561&6 +!%177!& &! 61%%&% "0;'( 1&+ 5&76 +&7% 71%&6 %1%5& %1!-&++1!&6 +15%1&! +!%177+&6 5&+ 61-%&!% "0;'( !1& 5-&!% 6&7 71+&! %1-5&6 %1!+&!+1!!&! +15%1+!&% +!%177-&- !&- 6166&%- "0;'( !1+&+ 57&!7 &!5 717& %1!5&- %1!%&!+1!& +15%15!&5 +!%1775&7 !!& 61666&+ "0;'( !15&6 57&7+ 6+5&- 715&5 %1!65&% %1!%&%+1!%&5 +15%1!!!&7 +!%1775&6 %& 6167&5% "0;'( !1!!&7 57&6! 6+7&7 71!&7 %1!75&7 %1!+&-+1!7&7 +15%1!%!&5 +!%1777&5 &! 616&6% "0;'( !1!%& 57&+ 6++&!! 71!&+ %1!5&! %1!5&+1!5&+ +15%1!-!& +!%177%&+ 6&6 61%& "0;'( !1!-& 5+&7- 6+& 71!%&+ %1-&- %1!!!&6+1&+ +15%1&5 +!%177!&! !&! 61%%&+6 "0;'( !1&! 5+&77 6+!&% 71!7&5 %1+-&% %1!!+&%+1&5 +15%16&+ +!%17+7& & 61%-5&!! "0;'( () * ) &$# ) +, ) ) -./ ") "0) !#)"# # $%& '( /) !0 ))*!+, )$%& '( ) ,, * 6 8 ; 678 < 678 435$" 6 8 45$ 6 8 +, 6 8 +, 6 8 / 6 8 3 / 6 8 , 6 8 & 675'=8 +* !16& 57&7 6%-&55 71!& %157& %1!&-+1+& +15%17& +!%17+!&7 !6&+ 61+7&+ "0;'( !17& 57&-+ 6%+&- 71& %16!+& %1!-&++17& +15%15& +!%17%%&- -&7 61+66&76 "0;'( !1&! 57& 6%6&7 71&+ %16%%& %1!6+&%+15&+ +15%16!-& +!%1767&- -& 61+7&-+ "0;'( !16& 5-&! 6%!&-- 71%&! %16-6&% %1!%%&6+16&! +15%16%7&% +!%17-&5 7&6 61+5-&- "0;'( !16+&! 5-& 66&6+ 71+&7 %1%!&- %1!+%&6+16!&7 +15%16-%&- +!%17!-&- 5&! 617!6&%7 "0;'( !165& 5-&66 667&+6 71-&! %1%&% %1!7+&++166&! +15%1%&6 +!%177&% &+ 61765&-7 "0;'( !1%!&! 5-&- 665&- 715&+ %1%+-& %1!--&+16%&+ +15%1%6&! +!%1+%& -&6 6177%&!% "0;'( !1%%& 57& 6%&6% 716& %1%5+& %1!5-&%+167& +15%1%+5&! +!%1+5%&% +&+ 6175&! "0;'( !1%-&! 57&!6 6%&+ 716!&5 %1+!6&7 %1!-&+16-&5 +15%1%57&+ +!%1+-%&5 -&7 61-!7&- "0;'( !1+& 5+&7% 6%%&- 716%& %1+%&6 %1+&%+1%& +15%1+!+&! +!%1+77&6 -&5 61-%6&% "0;'( !1+6& 5+&!! 6%7&%- 7167&% %1+-!& %1!&5+1%&% +15%1+%%&! +!%1++5&5 +& 61--&% "0;'( !1+7& 57& 6%&+% 7165&- %17&+ %1!&+1%%&- +15%1+-6&6 +!%1++&+ !&- 61-5& "0;'( !1+&+ 57&% 6+!&+ 71%&5 %176&+ %1%&!+1%7&5 +15%176&6 +!%1+%-&6 +&7 6157&7% "0;'( !17& 56&++ 6+6&!5 71%6&+ %17+&7 %15&!+1%&+ +15%176&% +!%1+%6&6 !&- 615+%&7 "0;'( !17+&! 56&56 6+%&!6 71%7&5 %175&6 %16!&%+1+&5 +15%177&! +!%1+6& 6&6 61556&6! "0;'( !175+& 57& 6+-&7% 71%&7 %1-%& %166&+1++&7 +15%17-& +!%1+6-&6 !6&% 61!-&6 "0;'( !1-!+& 5&!% 6+&- 71+&7 %1-+%& %16%&++1+7&7 +15%1--& +!%1+67&7 !&7 61%7&77 "0;'( !1-%& 5&% !&6- 71+& %1--&! %16%&+1+7& +15%1-+!& +!%1+67&5 +&- 61-!&- "0;'( !1--& 5& -&! 71+!&6 %155& %16&+1+-&6 +15%1-5!&- +!%1+6& !&7 %1&5 "0;'( !15&+ 5&7 7&-5 71+!&5 %156& %15&6+1+-&5 +15%15!!& +!%1+%&7 !&7 %16!&%6 "0;'( !156& 5&%5 &% 71+&! %157&6 %1%&+1+5&! +15%15%& +!%1+%7&5 5&! %17!&- "0;'( !157&! !& !&75 71+!&- %15-& %1!5&++1+-&- +15%15-&- +!%1++&6 !%&7 %1&+ "0;'( !15&5 & !&-+ 71+&7 %1-&5 %1!!&-+1+7&7 +15%1&7 +!%1++5& &% %1!!&+- "0;'( !1&6 6&75 !7&5- 71%&! %1+7&6 %1%&+1++&! +15%1&! +!%1+77&% !%& %1!+&% "0;'( !1+&6 &-- !5&5- 71%-&+ %15%&5 %1!+&+1+6&+ +15%1+-&7 +!%1+-+&+ -&6 %1!5&76 "0;'( !15&6 &67 &+7 71%7&! +1!6& %1!5%&+1+&! +15%15+&5 +!%1+5+&7 +&5 %1!&!% "0;'( !!1!&6 !& 6&! 71%+& +1%& %1!-6&-+1+!& +15+1!6&- +!%1+7&- &7 %16&+% "0;'( !!1%&- !&7 %&-+ 71%%&% +175&7 %1!7!&%+1+&% +15+1%!&+ +!%17& +& %17& "0;'( !!1-& !&- -&6 71%6&5 +1+&! %1!%5&++1%&5 +15+175&! +!%17!&- -& %1-&6% "0;'( !!1!&! 55&7 &% 71%6&- +1!!&+ %1!6%&%+1%&- +15+1%&% +!%176+&5 !&- %16+&-% "0;'( !!1!& 5-&% 6!&- 71%%&- +1!%-&! %1!!&+1+&- +15+1!&! +!%17+!& !&6 %16+6&76 "0;'( !!1!7& 5-&5+ 6+& 71%7& +1!-&6 %1!&%+1+& +15+1!%+&6 +!%177-&7 !&5 %165!&6% "0;'( !!1!& 55&!7 65&!! 71%-&! +1!7& %15%&7+1+6&! +15+1!7&6 +!%175+&% &5 %1%-&5 "0;'( !!1& 5&7 %&% 71%-&- +1!&+ %17+&-+1+6&- +15+1!&7 +!%1-%&6 5&7 %1%6%&!- "0;'( !!17& & %!& 71%-&! +1%&7 %16&%+1+6&! +15+1&- +!%1-6&% -&% %1%75&67 "0;'( !!1+& & %!& 71%+& +1-+&7 %1!7&+1+!& +15+1%5&5 +!%1-+6&5 & %1%5&7 "0;'( (+ T + 1 337.856-7201 1058 Baker Hughes Drive Broussard, LA 70518, USA Ma rch 25, 2022 AOGCC Attention: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Alaska 99501-3539 Subject: FFin a ll Lo gg Dis t r ib u t io nn fo rr C o n o c o P h illip ss Ala s k a ,, In c .. 2 W -0 9 L11 Ku p a r u kk Riv e rr AP II #:: 5 0 -0 2 9 -2 12 3 5 -6 0 -0 00 P e r m itt No :: 2 2 2 -0 0 55 Rig :: C DR33 The final Coil deliverables were uploaded via https://copsftp.sharefile.com/ for the above well. Items delivered: Digital Las Data, Graphic Images CGM/PDF and Survey Files. Thank you. Signature of receiver& date received: Please return transmittal letter to: Jerissa Hampton jerissa.hampton@conocophillips.com A. Ca rolina Ma rtine z Arelys.Martinez@bakerhughes.com 222-005 T36434 Meredith Guhl Digitally signed by Meredith Guhl Date: 2022.03.29 10:05:21 -08'00' STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION *All BOPE reports are due to the agency within 5 days of testing* SSub m i t t o :jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Owner/Contractor: Rig No.:CDR3AC DATE: 2/26/22 Rig Rep.: Rig Phone: 907-670-6082 Operator: Op. Phone:907-670-6050 Rep.: E-Mail Well Name:PTD #22220050 Sundry # Operation: Drilling: X Workover: Explor.: Test: Initial: X Weekly: Bi-Weekly: Other: Rams:250/3500 Annular:250/2500 Valves:250/3500 MASP:2268 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen.P Well Sign P Upper Kelly 0NA Housekeeping P Rig P Lower Kelly 0NA PTD On Location P Hazard Sec.P Ball Type 2P Standing Order Posted P Misc.NA Inside BOP 0NA FSV Misc 0NA BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 1 2''P Trip Tank NA NA Annular Preventer 1 7 1/16''P Pit Level Indicators PP #1 Rams 1 Blind Shear P Flow Indicator PP #2 Rams 1 2'' Combi P Meth Gas Detector PP #3 Rams 1 2 3/8'' Combi P H2S Gas Detector PP #4 Rams 1 2'' Combi P MS Misc 0NA #5 Rams 0NA #6 Rams 0NA Quantity Test Result Choke Ln. Valves 1 2 1/16''P Inside Reel valves 1P HCR Valves 2 2 1/16''P Kill Line Valves 5 2 1/16''FP Check Valve 0NAACCUMULATOR SYSTEM: BOP Misc 3 3 1/8'' / swab P Time/Pressure Test Result System Pressure (psi)3050 P CHOKE MANIFOLD:Pressure After Closure (psi)2550 P Quantity Test Result 200 psi Attained (sec)19 P No. Valves 12 FP Full Pressure Attained (sec)50 P Manual Chokes 1P Blind Switch Covers: All stations Yes Hydraulic Chokes 1P Nitgn. Bottles # & psi (Avg.): 4 @ 1950 P CH Misc 0NA ACC Misc 0NA Test Results Number of Failures:2 Test Time:9.0 Hours Repair or replacement of equipment will be made within days. Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 2/23/22 09:17 Waived By Test Start Date/Time:2/25/2022 5:00 (date) (time)Witness Test Finish Date/Time:2/26/2022 18:00 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Bob Noble Nabors Pit level alarms tested, LEL and H2S alarms tested. Verified flow through Micromotion. C-11 failed greased and retested all good. R-3 Failed, changed out valve and tested replacement all good. NOTE: Testing was suspended due to Phase 3 weather conditions. Cleve Coyne/Robert Coyne Conoco Phillips Alaska Chase Erdman/Perry Klein KRU 2W-09L1 Test Pressure (psi): cdr3.companyman@conocophillips.com Form 10-424 (Revised 02/2022) 2022-0226_BOP_Nabors_CDR3AC_KRU_2W -09L1 9 9 9 9 9 9 9 9 9 -%5 2/26/22 C-11 failed greased and retestedg all good. R-3 Failed, changed out valve and tested replacement all good. 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov James Ohlinger Staff CTD Engineer ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510 Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 2W-09L1 &RQRFR3KLOOLSV$ODVND,QF Permit to Drill Number: 222-005 Surface Location: 579' FNL, 304' FEL, Sec. 33, T12N, R9E, UM Bottomhole Location: 353' FNL, 4172' FEL, Sec. 28, T12N, R9E, UM Dear Mr.2KOLQJHU: Enclosed is the approved application for the permit to drill the above referenced well. The permit is for a new wellbore segment of existing well Permit 184-219, API 50-029-21235-00- 00. Injection should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Jeremy M. Price Chair DATED this ___ day of February, 2022. Jeremy Price Digitally signed by Jeremy Price Date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y Samantha Carlisle at 4:03 pm, Jan 24, 2022 'LJLWDOO\VLJQHGE\-DPHV2KOLQJHU '1&1 -DPHV2KOLQJHU2 &RQRFR3KLOOLSV28 &7' ( -DPHV-2KOLQJHU#FRQRFRSKLOOLSVFRP& 86 5HDVRQ,DPWKHDXWKRURIWKLVGRFXPHQW /RFDWLRQ\RXUVLJQLQJORFDWLRQKHUH 'DWH )R[LW3')(GLWRU9HUVLRQ -DPHV2KOLQJHU 6)' 6)' 97/ '65 ; %23 WHVW WR SVLJ $QQXODU SUHYHQWHU WHVW WR SVLJ dts 2/8/2022 JLC 2/8/2022 2/8/22 Jeremy Price Digitally signed by Jeremy Price Date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« :W/HQO« *UDGH + 7RS7KUHDG :(/'(' &DVLQJ'HVFULSWLRQ 685)$&( 2'LQ ,'LQ 7RSIW.% 6HW'HSWKIW.% 6HW'HSWK79'« :W/HQO« *UDGH - 7RS7KUHDG %877 &DVLQJ'HVFULSWLRQ 352'8&7,21 2'LQ ,'LQ 7RSIW.% 6HW'HSWKIW.% 6HW'HSWK79'« :W/HQO« *UDGH - 7RS7KUHDG %877 7XELQJ6WULQJV 7XELQJ'HVFULSWLRQ 78%,1* 6WULQJ0D« ,'LQ 7RSIW.% 6HW'HSWKIW« 6HW'HSWK79'« :WOEIW *UDGH - 7RS&RQQHFWLRQ (8(5' &RPSOHWLRQ'HWDLOV 7RSIW.% 7RS79' IW.% 7RS,QFO ,WHP'HV 1RPLQDO,' LQ 2' 1RPLQDO LQ0DNH 0RGHO &RP +$1*(5 )0&78%,1*+$1*(5 6$)(7<9/9 %$.(5)9/6$)(7< 9$/9(/2&.('287 *$6/,)7 00+ )0+2 *$6/,)7 00+ )0+2 *$6/,)7 00+ )0+2 *$6/,)7 00+ )0+2 *$6/,)7 00+ )0+2 *$6/,)7 00+ )0+2 *$6/,)7 00+ )0+2 *$6/,)7 00+ )0+2 3%5 %$.(53%5 3$&.(5 %$.(5)+/ 5(75,(9$%/(3$&.(5 %/$675,1* %/$675,1*6 %/$67-7 %$.(5%/$67-2,17 /2&$725 %$.(5)%/2&$725 68% 3$&.(5 %$.(5)% 3(50$1(173$&.(5 6%( %$.(56($/%25( (;7(16,21 1,33/( &$0&2'1,33/(12*2 :/(* %$.(5:,5(/,1(5( (175<*8,'( 2WKHU,Q+ROH:LUHOLQHUHWULHYDEOHSOXJVYDOYHVSXPSVILVKHWF 7RS IW.% 7RS 79' IW.% 7RS,QFO 'HV &RP 5XQ'DWH ,'LQ 61 &DVLQJ/HDN /HDNLGHQWLILHG#a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ompanyConocoPhillips Alaska, Inc.Well Name:KUPARUK RIV UNIT 2W-09L1Initial Class/TypeSER / PENDGeoArea890Unit11160On/Off ShoreOnProgramSERField & PoolWell bore segAnnular DisposalPTD#:2220050KUPARUK RIVER, KUPARUK RIV OIL - 490100NA1Permit fee attachedYesEntire well within ADL0025642.2Lease number appropriateYes3Unique well name and numberYesKuparuk River Oil Pool, governed by Conservation Order No. 432E4Well located in a defined poolYesAs planned, well conforms with spacing requirements.5Well located proper distance from drilling unit boundaryYes6Well located proper distance from other wellsYes7Sufficient acreage available in drilling unitYes8If deviated, is wellbore plat includedYes9Operator only affected partyYes10Operator has appropriate bond in forceYes11Permit can be issued without conservation orderYes12Permit can be issued without administrative approvalYes13Can permit be approved before 15-day waitYesArea Injection Order No. 2C - Kuparuk River Unit14Well located within area and strata authorized by Injection Order # (put IO# in comments) (ForYesKRU 2W-10, a long-term shut in injector inactive since 2011.15All wells within 1/4 mile area of review identified (For service well only)Yes16Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA17Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)NA18Conductor string providedNA19Surface casing protects all known USDWsNA20CMT vol adequate to circulate on conductor & surf csgNA21CMT vol adequate to tie-in long string to surf csgNoProductive interval will be completed with uncemented slotted liner22CMT will cover all known productive horizonsYes23Casing designs adequate for C, T, B & permafrostYesRig has steel tanks; all waste to approved disposal wells24Adequate tankage or reserve pitNA25If a re-drill, has a 10-403 for abandonment been approvedYesAnti-collision analysis complete; no major risk failures26Adequate wellbore separation proposedNA27If diverter required, does it meet regulationsYesMax formation pressure is 2837 psi(9.6 ppg EMW); will drill w/8.6 ppg EMW & maintain overbal w/ MPD28Drilling fluid program schematic & equip list adequateYes29BOPEs, do they meet regulationYesMPSP is 2268 psi; will test BOPs to 3500 psi30BOPE press rating appropriate; test to (put psig in comments)Yes31Choke manifold complies w/API RP-53 (May 84)Yes32Work will occur without operation shutdownYes33Is presence of H2S gas probableYesKRU 2W-10 LTSI34Mechanical condition of wells within AOR verified (For service well only)NoH2S measures required. Wells on 2W-Pad are H2S-bearing.35Permit can be issued w/o hydrogen sulfide measuresYesAnticipated pressure is 9.6 ppg EMW. Well will be drilled with 8.6 ppg mud using36Data presented on potential overpressure zonesNAMPD to maintain 11.8 ppg EMW.37Seismic analysis of shallow gas zonesNA38Seabed condition survey (if off-shore)NA39Contact name/phone for weekly progress reports [exploratory only]ApprSFDDate2/3/2022ApprVTLDate1/31/2022ApprSFDDate2/3/2022AdministrationEngineeringGeologyGeologic Commissioner:Date:Engineering Commissioner:DatePublic CommissionerDate-03JLC 2/8/2022