Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
222-034
DATA SUBMITTAL COMPLIANCE REPORT API No. 50-103-20170-60-00Well Name/No. KUPARUK RIV UNIT 2M-22L1 Completion Status 1-OILCompletion Date 5/25/2022 Permit to Drill 2220340 Operator ConocoPhillips Alaska, Inc. MD 10769 TVD 6130 Current Status 1-OIL 8/22/2023 UIC No Well Log Information: Digital Med/Frmt ReceivedStart Stop OH / CH Comments Log Media Run No Electr Dataset Number Name Interval List of Logs Obtained:GR/Res NoNo YesMud Log Samples Directional Survey REQUIRED INFORMATION (from Master Well Data/Logs) DATA INFORMATION Log/ Data Type Log Scale DF 6/17/20228126 10769 Electronic Data Set, Filename: 2M-22L1 GAMMA RES.las 36698ED Digital Data DF 6/17/2022 Electronic File: 222-034_2M- 22L1_BKR_Distribution AOGCC.docx 36698ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1 2MD Final Log.cgm36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1 5MD Final Log.cgm36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1 5TVDSS Final Log.cgm36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 10.cgm36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 11.cgm36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 12.cgm36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 13.cgm36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 14.cgm36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 15.cgm36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1 GAMMA RES.ASC36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Digital Data_Run 10.ASC 36698ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Digital Data_Run 11.ASC 36698ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Digital Data_Run 12.ASC 36698ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Digital Data_Run 13.ASC 36698ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Digital Data_Run 14.ASC 36698ED Digital Data Tuesday, August 22, 2023AOGCCPage 1 of 6 PB1 2M-22L1 GAMMA RES.las DATA SUBMITTAL COMPLIANCE REPORT API No. 50-103-20170-60-00Well Name/No. KUPARUK RIV UNIT 2M-22L1 Completion Status 1-OILCompletion Date 5/25/2022 Permit to Drill 2220340 Operator ConocoPhillips Alaska, Inc. MD 10769 TVD 6130 Current Status 1-OIL 8/22/2023 UIC No DF 6/17/2022 Electronic File: 2M-22L1 2MD Final.pdf36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1 5MD Final.pdf36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1 5TVDSS Final.pdf36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 10.PDF36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 11.PDF36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 12.PDF36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 13.PDF36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 14.PDF36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 15.PDF36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1 NAD27 Definitive Surveys.pdf 36698ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1 NAD27 Definitive Surveys.txt 36698ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1 NAD83 Definitive Surveys.pdf 36698ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1 NAD83 Definitive Surveys.txt 36698ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1 2MD Final Log.tif36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1 5MD Final Log.tif36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1 5TVDSS Final Log.tif36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 10.tif36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 11.tif36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 12.tif36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 13.tif36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 14.tif36698EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1_PWD Log_Run 15.tif36698EDDigital Data DF 6/17/20228126 9990 Electronic Data Set, Filename: 2M-22L1PB1 GAMMA RES.las 36699ED Digital Data DF 6/17/2022 Electronic File: 222-034_2M- 22L1PB1_BKR_Distribution AOGCC.docx 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1 2MD Final Log.cgm36699EDDigital Data Tuesday, August 22, 2023AOGCCPage 2 of 6 2M-22L1PB1 GAMMA RES.las DATA SUBMITTAL COMPLIANCE REPORT API No. 50-103-20170-60-00Well Name/No. KUPARUK RIV UNIT 2M-22L1 Completion Status 1-OILCompletion Date 5/25/2022 Permit to Drill 2220340 Operator ConocoPhillips Alaska, Inc. MD 10769 TVD 6130 Current Status 1-OIL 8/22/2023 UIC No DF 6/17/2022 Electronic File: 2M-22L1PB1 5MD Final Log.cgm36699EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1PB1 5TVDSS Final Log.cgm 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 01.cgm 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 02.cgm 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 03.cgm 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 04.cgm 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 05.cgm 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 06.cgm 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 07.cgm 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 08.cgm 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 09.cgm 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1 GAMMA RES.ASC36699EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Digital Data_Run 01.ASC 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Digital Data_Run 02.ASC 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Digital Data_Run 03.ASC 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Digital Data_Run 04.ASC 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Digital Data_Run 05.ASC 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Digital Data_Run 06.ASC 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Digital Data_Run 07.ASC 36699ED Digital Data Tuesday, August 22, 2023AOGCCPage 3 of 6 DATA SUBMITTAL COMPLIANCE REPORT API No. 50-103-20170-60-00Well Name/No. KUPARUK RIV UNIT 2M-22L1 Completion Status 1-OILCompletion Date 5/25/2022 Permit to Drill 2220340 Operator ConocoPhillips Alaska, Inc. MD 10769 TVD 6130 Current Status 1-OIL 8/22/2023 UIC No DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Digital Data_Run 08.ASC 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Digital Data_Run 09.ASC 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1 2MD Final Log.PDF36699EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1PB1 5MD Final Log.PDF36699EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1PB1 5TVDSS Final Log.PDF 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 01.PDF 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 02.PDF 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 03.PDF 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 04.PDF 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 05.PDF 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 06.PDF 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 07.PDF 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 08.PDF 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 09.PDF 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1 NAD27 Definitive Surveys.pdf 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1 NAD27 Definitive Surveys.txt 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1 NAD83 Definitive Surveys.pdf 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1 NAD83 Definitive Surveys.txt 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1 2MD Final Log.tif36699EDDigital Data Tuesday, August 22, 2023AOGCCPage 4 of 6 DATA SUBMITTAL COMPLIANCE REPORT API No. 50-103-20170-60-00Well Name/No. KUPARUK RIV UNIT 2M-22L1 Completion Status 1-OILCompletion Date 5/25/2022 Permit to Drill 2220340 Operator ConocoPhillips Alaska, Inc. MD 10769 TVD 6130 Current Status 1-OIL 8/22/2023 UIC No Well Cores/Samples Information: ReceivedStart Stop Comments Total Boxes Sample Set NumberName Interval INFORMATION RECEIVED Completion Report Production Test Information Geologic Markers/Tops Y Y / NA Y Mud Logs, Image Files, Digital Data Composite Logs, Image, Data Files Cuttings Samples Y / NA Y Y / NA Directional / Inclination Data Mechanical Integrity Test Information Daily Operations Summary Y Y / NA Y Core Chips Core Photographs Laboratory Analyses Y / NA Y / NA Y / NA COMPLIANCE HISTORY Completion Date: 5/25/2022 DF 6/17/2022 Electronic File: 2M-22L1PB1 5MD Final Log.tif36699EDDigital Data DF 6/17/2022 Electronic File: 2M-22L1PB1 5TVDSS Final Log.tif 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 01.tif 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 02.tif 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 03.tif 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 04.tif 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 05.tif 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 06.tif 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 07.tif 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 08.tif 36699ED Digital Data DF 6/17/2022 Electronic File: 2M-22L1PB1_PWD Log_Run 09.tif 36699ED Digital Data Tuesday, August 22, 2023AOGCCPage 5 of 6 DATA SUBMITTAL COMPLIANCE REPORT API No. 50-103-20170-60-00Well Name/No. KUPARUK RIV UNIT 2M-22L1 Completion Status 1-OILCompletion Date 5/25/2022 Permit to Drill 2220340 Operator ConocoPhillips Alaska, Inc. MD 10769 TVD 6130 Current Status 1-OIL 8/22/2023 UIC No Comments: Compliance Reviewed By:Date: Date CommentsDescription Release Date:4/5/2022 Tuesday, August 22, 2023AOGCCPage 6 of 6 M. Guhl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y Meredith Guhl at 2:47 pm, Jun 21, 2022 5/25/2022 6/16/2002 9/2/1992 Completed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igitally signed by James J. OhlingerDN: C=US, OU=ConocoPhillips, O=Wells - Coiled Tubing Drlling, CN=James J. Ohlinger, E=James.J.Ohlinger@cop.com Reason: I am the author of this documentLocation: your signing location hereDate: 2022.06.21 14:28:06-08'00'Foxit PDF Editor Version: 11.2.1 James J. Ohlinger 2M-22 Final CTD Schematic 9-5/8" 47# L-80 shoe @ 3373' MD 7" 26# J-55 shoe @ 8581' MD 16" 62# H-40 shoe @ 121' MD A-sand perfs 8284' - 8362' MD KOP @ 8286' MD HEW 3-1/2" Camco TRDP SSSV at 1794' MD (locked out) 3-1/2" 9.3# J-55 EUE 8rd Tubing to surface 3-1/2" Camco MMG gas lift mandrels at: 3459' MD 5305' MD 5977' MD 6491' MD 7005' MD 7519' MD 8043' MD Otis 3-1/2" PBR at 8099' MD Otis HVT packer at 8115' MD (3.25" ID) D-nipple at 8134'' MD (2.75" min ID, No-Go) 3-1/2" tubing tail at 8147' MD 2M-22L1 TD @ 10,769' MD 2-3/8" slotted liner Liner bottom @ 8475' MD 2M-22L1PB1 TD @ 9990' MD Anchored billet @ 9000' MD Failed HEW fell downhole Page 1/14 2M-22 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/14/2022 06:00 5/14/2022 09:00 3.00 MIRU, MOVE RURD P Continue prepping to MOB to 2M-22, Disconnect High line power 0.0 0.0 5/14/2022 09:00 5/14/2022 10:30 1.50 MIRU, MOVE RURD P NES trucks on location. Load shop / Prep halfway house for travel 0.0 0.0 5/14/2022 10:30 5/14/2022 13:30 3.00 MIRU, MOVE RURD P Pull modules off well, Jeep up modules. Rig up dragging trucks 0.0 0.0 5/14/2022 13:30 5/14/2022 21:00 7.50 MIRU, MOVE MOB P Doyon 19 has cleared Oiliktok Y. Start moving rig toward 2M pad, Stand by at CPF 2 for field crew change out, Continue on to 2M pad 0.0 0.0 5/14/2022 21:00 5/14/2022 21:42 0.70 MIRU, MOVE RURD P On location, remove jeeps, Prep to spot modules 0.0 0.0 5/14/2022 21:42 5/15/2022 00:00 2.30 MIRU, MOVE RURD P Spot sub module, set mats 0.0 0.0 5/15/2022 00:00 5/15/2022 01:30 1.50 MIRU, MOVE RURD P Spot pits, Lay mats 0.0 0.0 5/15/2022 01:30 5/15/2022 05:00 3.50 MIRU, MOVE RURD P Modules set, Safe out rig, Prep walk ways, lower stairs, Rig up putz. TT spoted, rigged up, hardline air tested. 0.0 0.0 5/15/2022 05:00 5/15/2022 08:00 3.00 MIRU, WHDBOP RURD P RIG ACCEPT 0500, Nipple up BOPE. Reconfig risers. Take stack measurements. Grease crew service tree, 0.0 0.0 5/15/2022 08:00 5/15/2022 10:00 2.00 MIRU, WHDBOP RURD P Lou Laubenstein, AOGCC on location. Flooding stack in prep for shell test, Test gas / H2S monitoring system 0.0 0.0 5/15/2022 10:00 5/15/2022 11:30 1.50 MIRU, WHDBOP BOPE P Fill stack for function test. TV1 leaked on shell test. Pull fluid out of stack. Replace vavle and retest 0.0 0.0 5/15/2022 11:30 5/15/2022 20:30 9.00 MIRU, WHDBOP BOPE P BOP test witness waived by AOGCC Austin McLeod 250/3500 psi Test 1. Swab 2- Pass Test 2. Blind/Shear, BOP TV2, Charlie 4, 5, 8, &12 - Pass Test 3. BOP TV 1, Charlie 3, 7, & 11 - Pass Test 4. Manual choke D & Super choke C - Pass Test 5. Romeo 3, Bleeder 3, Tango 2, Charlie 2, & 10 - Pass Test 6. Charlie 1, 9, Bravo 5, and Tango 1 – Pass - install TIW test joint - Test 7. Lower 2” pipe slip rams, TIW #1, Romeo 1, Bleeder 1 - Pass Test 8. Annular BOP 250/2500- Pass Test 9. Upper 2” pipe slip rams, Bravo 6, & 8- Pass Test 10. Bravo 7 – swap out 2” test joint for 2-3/8”- Pass Test 11. 2-3/8” pipe slip rams, TIW#2 – check N2 levels, swap to 2” test joint- Pass Test 12. Draw down accumulator- Pass 1800 N2 average // Koomy 2950 start 2350 End 23 sec to 200 48 sec to full charge 3000psi Test 13. Stab injector and line up to reverse circulate coil, test inner reel valve and stripper. Tested all gas detectors, pits, cellar, Verified flow alarms - PVT 0.0 0.0 5/15/2022 20:30 5/15/2022 21:30 1.00 MIRU, WHDBOP PRTS P Pressure test PDL's and Tiger Tank Line 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/26/2022 Page 2/14 2M-22 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/15/2022 21:30 5/15/2022 23:00 1.50 PROD1, RPEQPT CTOP P Blow down choke, perform valve checklist, line up for pressure deploy , open SSV , blow down tiger tank line bleed off IA pressure 0.0 0.0 5/15/2022 23:00 5/15/2022 23:45 0.75 PROD1, RPEQPT PULD P Pick up Baker coil track tools and load iin PDL BHA# 1 nozzle run 0.0 0.0 5/15/2022 23:45 5/16/2022 00:00 0.25 PROD1, RPEQPT PULD P PD BHA# 1 Nozzle Run 0.0 0.0 5/16/2022 00:00 5/16/2022 00:45 0.75 PROD1, RPEQPT PULD P PD BHA# 1 Nozzle Assembly 0.0 55.1 5/16/2022 00:45 5/16/2022 02:45 2.00 PROD1, RPEQPT TRIP P RIH with nozzle taking returns to TT swapping well to seawater and then to milling fluid 55.1 8,140.0 5/16/2022 02:45 5/16/2022 03:09 0.40 PROD1, RPEQPT DLOG P Log K1 for +5' correction // get up wt @ 47K 8,140.0 8,196.0 5/16/2022 03:09 5/16/2022 03:21 0.20 PROD1, RPEQPT TRIP P RIH T/ 8310' to ensure setting area clear // Milling fluid at bit pump 5 bbls ahead // 8,196.0 8,310.0 5/16/2022 03:21 5/16/2022 05:21 2.00 PROD1, RPEQPT TRIP P POOH for WS setting assembly chasing milling fluid to surface 8,310.0 55.0 5/16/2022 05:21 5/16/2022 05:57 0.60 PROD1, RPEQPT PULD P PUD BHA #1 55.0 0.0 5/16/2022 05:57 5/16/2022 07:18 1.35 PROD1, RPEQPT WAIT P Wait on NS, Truck broke down on way to location 0.0 0.0 5/16/2022 07:18 5/16/2022 08:54 1.60 PROD1, RPEQPT PULD P Whipstock / Northern Solotions on location, Make up HEW whipstock. PD whipstock. Make up to coil and surface test. 0.0 73.0 5/16/2022 08:54 5/16/2022 10:54 2.00 PROD1, RPEQPT TRIP P RIH w/ whipstock, EDC open 73.0 8,125.0 5/16/2022 10:54 5/16/2022 11:06 0.20 PROD1, RPEQPT DLOG P Log K1 for +1, PUW=47K 8,125.0 8,187.0 5/16/2022 11:06 5/16/2022 11:12 0.10 PROD1, RPEQPT TRIP P RIH to set depth 8298.75, Orient to HS 8,187.0 8,298.8 5/16/2022 11:12 5/16/2022 11:36 0.40 PROD1, RPEQPT WPST P Close EDC, zero DHWOB. Bring pump on to 2500 PSI and hesitate, up to 3000 psi tool sheared. RIH to set weight on whipstock. Not there 8,298.8 8,318.0 5/16/2022 11:36 5/16/2022 13:30 1.90 PROD1, RPEQPT TRIP T Open EDC, POOH 8,318.0 68.6 5/16/2022 13:30 5/16/2022 15:18 1.80 PROD1, RPEQPT PULD T On surface, tag up, space out, PJSM, PUD BHA #2 68.6 0.0 5/16/2022 15:18 5/16/2022 17:42 2.40 PROD1, RPEQPT PULD T PD BHA #3, HEW whipstock #2 0.0 73.0 5/16/2022 17:42 5/16/2022 19:24 1.70 PROD1, RPEQPT TRIP T RIH, EDC open 73.0 8,145.0 5/16/2022 19:24 5/16/2022 19:30 0.10 PROD1, RPEQPT DLOG T Log K1 8,145.0 8,184.0 5/16/2022 19:30 5/16/2022 19:42 0.20 PROD1, RPEQPT TRIP T Continue in well, Stop at 8294.75 8,184.0 8,294.8 5/16/2022 19:42 5/16/2022 19:54 0.20 PROD1, RPEQPT WPST T Stop, Shut down pump, Orient to high side, Close EDC. TOWS=8286. Roll pumps to 2000 PSI, hesatate. Roll to 3000 PSI hesatate, DHWOB coming up. Roll pump. See tool shear at3700 PSI, DHWOB=-5.5K. Looks good 8,294.8 8,294.8 5/16/2022 19:54 5/16/2022 21:30 1.60 PROD1, RPEQPT TRIP P POOH, PUW=46K 8,294.8 70.2 5/16/2022 21:30 5/16/2022 23:00 1.50 PROD1, RPEQPT PULD P At surface, tag up and space out, PUD BHA #3 70.2 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/26/2022 Page 3/14 2M-22 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/16/2022 23:00 5/17/2022 00:00 1.00 PROD1, RPEQPT PULD P Make up / Deploy BHA # 4, Window milling BHA w/ 1° fixed bend motor, 2.80 Window mill, and 2.79 string reamer 0.0 75.0 5/17/2022 00:00 5/17/2022 02:00 2.00 PROD1, RPEQPT TRIP P RIH tie in +3.5' correction , tag WS @ 8292' 75.0 8,292.0 5/17/2022 02:00 5/17/2022 08:45 6.75 PROD1, WHPST WPST P OBM F/ 8291.5 1.83 bpm 4603 pp 597 Diff Free spin Exit @ 8294.6' @ 06:06 8,292.0 8,317.0 5/17/2022 08:45 5/17/2022 09:45 1.00 PROD1, WHPST REAM P Ream windown per plan HS / 30L / 30R Dry drift and confirm TD 8,317.0 8,317.0 5/17/2022 09:45 5/17/2022 11:30 1.75 PROD1, WHPST TRIP P POOH for build BHA 8,317.0 77.0 5/17/2022 11:30 5/17/2022 13:15 1.75 PROD1, WHPST PULD P Tag up and space out, PUD BHA# 4 Window Mill Assembly Mill out 2.80 NG String Reamer out 2.79 NG 77.0 0.0 5/17/2022 13:15 5/17/2022 14:15 1.00 PROD1, WHPST CIRC P Flush stack from milling window 0.0 0.0 5/17/2022 14:15 5/17/2022 16:15 2.00 PROD1, DRILL PULD P Pick up and Deploy BHA# 5 Build assembly, HCC Bi-center bit, 2.4+° AKO xtreme 0.0 77.0 5/17/2022 16:15 5/17/2022 17:51 1.60 PROD1, DRILL TRIP P RIH W/BHA #5 77.0 8,140.0 5/17/2022 17:51 5/17/2022 18:03 0.20 PROD1, DRILL DLOG P Tie into the K1 for a +2' correction. PU Wt 48 k 8,140.0 8,173.0 5/17/2022 18:03 5/17/2022 18:15 0.20 PROD1, DRILL TRIP P Continue to RIH 8,173.0 8,317.0 5/17/2022 18:15 5/17/2022 18:39 0.40 PROD1, DRILL DRLG P Drill ahead to hard stall @ 8,347.5' PU Wt 55 k lbs - OA 485 psi, IA 887 psi 8,317.0 8,347.5 5/17/2022 18:39 5/17/2022 20:39 2.00 PROD1, DRILL DRLG P Drill ahead very slowly, multiple stalls, more than 10. PU Weights to 72 k lbs, WOB to -7 k lbs, dragging weight up hole, heavy white cuttings returned tot he shaker - On sight Geo is calling them frac sand. Work slowly to 8,353. Repeatedly finding bottom higher than where we left it and generally in the 8,349 - 8,350' range. Multiple pick ups and sweeps while attempting to clean up the area, Cutting ratio increasing rapidly to 0.85. 8,347.5 8,355.0 5/17/2022 20:39 5/17/2022 21:03 0.40 PROD1, DRILL WPRT P PU 62 k lbs, drag up to -2 k WOB, CT Wt cleaned up to 50 k lbs, Pull through window clean. Make jetting passes in the 7" while chasing a 5x5 sweep to surface. Same heavy white cuttings as we've been seeing. 8,355.0 8,135.0 5/17/2022 21:03 5/17/2022 21:30 0.45 PROD1, DRILL TRIP P RBIH, Ct Wt 7-8 k lbs. Set down in window once, Pick up and spin the bit, RIH through window clean. 8,355.0 8,350.0 5/17/2022 21:30 5/18/2022 00:00 2.50 PROD1, DRILL DRLG P Set rate - CT 4,617 psi, @ 1.88 in and 1.80 bpm out, WH 470 psi, IA 903 psi, OA 627 psi, BHP 3843 psi. Free spin 520 psi. Ct Wt 7.5 k lbs, see motor work shallow at 8,348'. Find bottom at 8,349'. Heavy stalls, PU WT to 76 k lbs, sticky, WOB to -6 k lbs. Drilling seemed to clean up after 8,357' Drill slowly ahead ~ 12 ft/hr 8,350.0 8,385.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/26/2022 Page 4/14 2M-22 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/18/2022 00:00 5/18/2022 00:48 0.80 PROD1, DRILL DRLG P Pick up for small BHA wiper, PU Wt 79 k lbs, WOB to -3.6 k lbs, Quick break over to C Wt of 57 k lbs, Set rate, CT 4,725 psi @ 1.89 bpm in, 1.88 bpm out, Free spin 563 psi. BHP 3,862 psi, targeting 11.9 ppg @ the window. 8388' PU Wt 73 k lbs - WOB -3.9 k 8,385.0 8,393.0 5/18/2022 00:48 5/18/2022 02:00 1.20 PROD1, DRILL DRLG P Appear to break out of whatever we had been struggling to drill @ 8,393' Drilling ahead, with WOB and motor work @ ~ 40 ft/hr. Motor work and ROP short lived. Motor work falling with increased WOB. Consult with engineering. 8,393.0 8,418.0 5/18/2022 02:00 5/18/2022 02:21 0.35 PROD1, DRILL WPRT P PU Wt 71 k lbs, POOH to inspect BHA /Bit Slight over pulls with neg WOB @ 8,350, /RBIH to 8,410'. PU Wt 61 k, dragging something, WOB to -3.5 k lbs, CT wt to 65 k lbs. Pulled clean, continued up hole. WOB to -3 k and CT Wt from 60 k to 68k @ 8,284' 8,418.0 8,280.0 5/18/2022 02:21 5/18/2022 04:27 2.10 PROD1, DRILL TRIP P Make jetting passes in the 7" to clean area, PU Wt in casing 54 k lbs. Park and open EDC, POOH pumping 2.2 bpm, targeting 12.0 ppg @ the window to maintain 1 for 1 returns. 8,280.0 72.0 5/18/2022 04:27 5/18/2022 05:57 1.50 PROD1, DRILL PULD P Bump up, PUD BHA #5 - build assembly #1. 72.0 0.0 5/18/2022 05:57 5/18/2022 06:42 0.75 PROD1, DRILL PULD P PD BHA #6, Build assembly #2 0.0 72.0 5/18/2022 06:42 5/18/2022 08:30 1.80 PROD1, DRILL TRIP P Tag up set counters RIH 100'/min pump .42 bpm 72.0 8,145.0 5/18/2022 08:30 5/18/2022 08:42 0.20 PROD1, DRILL DLOG P Log K1 for +1' Correction 8,145.0 8,172.0 5/18/2022 08:42 5/18/2022 08:54 0.20 PROD1, DRILL DRLG P OBD F/ 8418 T/ 8422 Coil not moving and stalled bit Started mud swap 8,172.0 8,322.0 5/18/2022 08:54 5/18/2022 10:00 1.10 PROD1, DRILL REAM P Heavy pick ups and motor work , pull to window to clean 7" 8,322.0 8,250.0 5/18/2022 10:00 5/18/2022 10:30 0.50 PROD1, DRILL CIRC P Circulate new mud around and clean up 7" 8,250.0 8,422.0 5/18/2022 10:30 5/18/2022 14:30 4.00 PROD1, DRILL DRLG P BOBD F/ 8422 T/ 8625 1.8 bpm 4315 pp Diff 700 Ann 3826 FS 502 diff 4227 pp 8,422.0 8,625.0 5/18/2022 14:30 5/18/2022 14:36 0.10 PROD1, DRILL WPRT P BHA Wiper to 8500' 8,625.0 8,625.0 5/18/2022 14:36 5/18/2022 18:42 4.10 PROD1, DRILL DRLG P BOBD F/ 8625 T/ 8,902 1.8 4254pp 604 dif 3824 ann Attempt to pick up @ 8,902'. Ct Wt to 80k +, stuck, squat -14 k, PU to 84k lbs, repeat, pop free **TD L1 build @ 8,902' 8,625.0 8,902.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/26/2022 Page 5/14 2M-22 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/18/2022 18:42 5/18/2022 20:21 1.65 PROD1, DRILL WPRT P Pull BHA wiper and loiter while 10x 10 TD sweep exits the bit. 8,638' start of trouble spot, clean Ct wt 54k pull 7 k over, -2 kWOB, with motor work, turn around, RBIH to clean up area, PUH - clean Same at 8,493' made two passes, Note, large tool face change at 8,450', shows up on neg WOB every pass. Dirty from 8,490 -8,425' - noisy neg WOB and motor work. 8,375' turn around, -4 k WOB, 10 k over on CT Wt, clean up - 8,337' spike in motor work, still seeing 8,350' trouble spot, Setting down, over pulls, motor work, etc. 8,313' Pull to 72 k lbs, -7 k WOB with no motor work, RBIH, PUH through window, 69 k through the window with -3 k WOB. Chased multiple sweeps on trip out. Ugly trip! 8,902.0 8,268.0 5/18/2022 20:21 5/18/2022 22:48 2.45 PROD1, DRILL TRIP P Make jetting passes through 7", Stack out in window - operator error. Park and open EDC, Back on pump to 2.3 bpm. POOH W BHA #6 - targeting 12.0 ppg EMW @ the window - Good trip. 8,268.0 72.0 5/18/2022 22:48 5/19/2022 00:00 1.20 PROD1, DRILL PULD P Bump up with BHA #6, build drilling assembly, PJSM, PUD BHA. ** Bit grade out - 4-6-BT-A-X-1/8-BT-TD 72.0 0.0 5/19/2022 00:00 5/19/2022 01:30 1.50 PROD1, DRILL PULD P PD BHA #7, ER L1 lateral drilling assembly, NOV agitator, 0.6 ° AKO motor and RB HYC A3 bit. 0.0 0.0 5/19/2022 00:00 5/19/2022 01:12 1.20 PROD1, DRILL PULD P PD BHA #7, ER L1 lateral drilling assembly, NOV agitator, 0.6 ° AKO motor and RB HYC A3 bit. 0.0 78.3 5/19/2022 01:12 5/19/2022 03:00 1.80 PROD1, DRILL TRIP P RIH w BHA #7 Park shallow ~ 501', close EDC, shallow test agitator, 1.7 bpm in, free spin diff 756 psi- good Continue to RIH 78.3 8,150.0 5/19/2022 03:00 5/19/2022 03:09 0.15 PROD1, DRILL DLOG P Tie in for +3' correction, PU Wt 50 k lbs 8,150.0 8,167.0 5/19/2022 03:09 5/19/2022 03:36 0.45 PROD1, DRILL TRIP P Continue in hole, window clean, 4 k WOB spike at 8,350', multiple WOB spikes with some motor work to 8,511', Build clean from 8,511 to EOB at 8,902'. Set parameters 8,167.0 8,902.0 5/19/2022 03:36 5/19/2022 07:00 3.40 PROD1, DRILL DRLG P CT 4,453 psi @ 1.85 bpm in and 1.81 bpm out, WH 492 psi, IA 832 psi, OA 597 psi, BHP 3,866 psi, targeting 12 ppg EMW at the window, 12.1 ppg at the bit, BHP 3,864 psi, Free spin diff 820 psi, RIH Wt 8 k lbs, OBD, CT Wt 5 k lbs, WOB 1.5 k lbs, ROP 130 ft/hr - 200 ft/hr - Good drilling. Clean pick up 68 k lbs. 8,902.0 9,300.0 5/19/2022 07:00 5/19/2022 08:00 1.00 PROD1, DRILL WPRT P Wiper through build to make sure its clean , tie in RA tag for +4' correction , wiper back to bottom 9,300.0 9,300.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/26/2022 Page 6/14 2M-22 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/19/2022 08:00 5/19/2022 13:30 5.50 PROD1, DRILL DRLG P CT 4,453 psi @ 1.85 bpm in and 1.81 bpm out, WH 418 psi, IA 842 psi, OA 694 psi, BHP 3,995 psi, targeting 12.1 ppg EMW at the window, 12.7 ppg at the bit, BHP 3,994 psi, Free spin diff 1028 psi, RIH Wt 8 k lbs, OBD, CT Wt 7 k lbs, WOB 1.5 k lbs, ROP 130 ft/hr - 200 ft/hr - Good drilling. Clean pick up 68 k lbs. 9,300.0 9,700.0 5/19/2022 13:30 5/19/2022 14:30 1.00 PROD1, DRILL WPRT P PU 75K , wiper 800' , pump sweeps 9,700.0 9,700.0 5/19/2022 14:30 5/19/2022 17:12 2.70 PROD1, DRILL DRLG P BOBD F/ 9700 T/ 9990 FS 4768 pp 971 diff Ann 3959 1.83 in 1.81 out PU 78K 9,700.0 9,990.0 5/19/2022 17:12 5/19/2022 21:48 4.60 PROD1, DRILL WPRT P PU wt 70 k lbs PUH on wiper trip for billet run. Start pulling heavy @ 8,496' Ct to 80 k lbs, WOB -3 k lbs. Fight to 8,380' RBIH, loiter below safety ~ 8500' and build additional sweeps. PUH attempting to clean up trouble area Starts at ~ 8,475' +/- make it to 8,349' RBIH multiple times, while pumping sweeps in attempt to clean up area and get out of hole. Large amount solids returned to the shaker, lots of white chips. Wellworc booked 1.5 bbls cuttings returned so far. Large overpull after entering 7" to 82 k lbs WOB to -6 k lbs, popped free. 9,990.0 8,245.0 5/19/2022 21:48 5/19/2022 22:51 1.05 PROD1, DRILL CIRC P Make multiple passes jetting the 7", launch another 5x5 sweep and chase to surface. Park and open EDC once sweep ~1000' above the bit. online at 2.3 bpm. 8,245.0 8,055.0 5/19/2022 22:51 5/20/2022 00:00 1.15 PROD1, DRILL TRIP P POOH @ 100 ft/min, -2 k WOB tug at GLM # 6 ~ 7520'. Small rocks back at the shaker as we passed ~5,300'. Slowed pulling speed to 60 ft/min, launched 5x5 sweep and chase surface to surface, nothing significant returned to the shaker, increased pulling speed. 8,055.0 2,825.0 5/20/2022 00:00 5/20/2022 00:45 0.75 PROD1, DRILL TRIP P Continue to POOH 2,825.0 74.0 5/20/2022 00:45 5/20/2022 01:51 1.10 PROD1, DRILL PULD P PUD BHA #7. BIT GRADE OUT - 1-3-BT-S-X-I-WT- BHA 74.0 0.0 5/20/2022 01:51 5/20/2022 03:03 1.20 PROD1, DRILL PULD P PD BHA #8, clean out assembly with 0.6° AKO and 2.80 NG D331 ridge set. Check pack offs, good. 0.0 64.6 5/20/2022 03:03 5/20/2022 05:03 2.00 PROD1, DRILL TRIP P RIH with clean out assembly 64.6 8,150.0 5/20/2022 05:03 5/20/2022 05:15 0.20 PROD1, DRILL DLOG P Tie in for a + 3', close EDC, PU Wt 57 k lbs. 8,150.0 8,170.0 5/20/2022 05:15 5/20/2022 08:30 3.25 PROD1, DRILL WASH P RIH through window clean. Set down 8,355' , 8423' , wash down to 9045', Pick up to 8310', pumps at min rate to drift to 9000' to ensure OHAB can pass, clean build on the way up and jet the tail pipe 8,170.0 8,300.0 5/20/2022 08:30 5/20/2022 10:15 1.75 PROD1, DRILL TRIP P POOH for OHAB 8,300.0 77.0 5/20/2022 10:15 5/20/2022 11:30 1.25 PROD1, DRILL PULD P Tag up space out // PJSM // PUD Bha #8 clean out assembly 77.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/26/2022 Page 7/14 2M-22 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/20/2022 11:30 5/20/2022 13:00 1.50 PROD1, DRILL PULD P Pick up BOT OHAB, Pressure Deploy BHA# 9 , 0.0 77.0 5/20/2022 13:00 5/20/2022 13:15 0.25 PROD1, DRILL SFTY T Prior to running in the hole found bend in coil ~100' back from coil connector, paint bend PJSM for un-deploy 77.0 77.0 5/20/2022 13:15 5/20/2022 14:30 1.25 PROD1, DRILL PULD T PUD BHA# 9 OHAB Setting Assembly 77.0 0.0 5/20/2022 14:30 5/20/2022 15:30 1.00 PROD1, DRILL CTOP T PJSM // LO/TO E-Line // Remove Baker Upper Quick , cut coil connector off and boot e-line , put cart on well 0.0 0.0 5/20/2022 15:30 5/20/2022 16:30 1.00 PROD1, DRILL CTOP T Line up reverse circulate, pump 4 bbls/min to pump wire back 0.0 0.0 5/20/2022 16:30 5/20/2022 18:00 1.50 PROD1, DRILL CTOP T Cut coil to damage spot Trim total of 115' - found wire at 35' back. ** new coil length 17,770' 0.0 0.0 5/20/2022 18:00 5/20/2022 19:00 1.00 PROD1, DRILL CTOP T Dress pipe and instal ne CTC - Pull test to 35 k lbs - good 0.0 0.0 5/20/2022 19:00 5/20/2022 20:00 1.00 PROD1, DRILL CTOP T Install upper quick - test wire, 80 ohms, >200 M ohms - good 0.0 0.0 5/20/2022 20:00 5/20/2022 21:00 1.00 PROD1, DRILL CTOP T Install high flow nozzle and stab injector, Pump slack forward to 3.5 bpm / pressure limited at ~6 k psi. Note could not hear wire moving. Move forward, un stab injector. 0.0 0.0 5/20/2022 21:00 5/20/2022 22:51 1.85 PROD1, DRILL PULD P PD BHa #9 - second attempt, Open Hole Anchored Billet (OHAB) setting assembly 0.0 73.0 5/20/2022 22:51 5/21/2022 00:00 1.15 PROD1, DRILL TRIP P RIH wti h OHAB setting assembly pumping 1.5 bpm 73.0 4,538.0 5/21/2022 00:00 5/21/2022 00:57 0.95 PROD1, DRILL TRIP P Continue to RIH with Open Hole Anchored Billet. Park for 8 minutes, Issue with Orion. Continue to RIH with billet while working Orion issue in parallel. 4,538.0 8,145.0 5/21/2022 00:57 5/21/2022 01:09 0.20 PROD1, DRILL DLOG P Tie intot he K1 for a +3' correction, close EDC, PU Wt 54 k lbs. 8,145.0 8,161.0 5/21/2022 01:09 5/21/2022 01:33 0.40 PROD1, DRILL KOST P Differential pressure started climbing immediately after closing EDC. Manipulated bleeders, could not determine the source of the pressure. Park, diff at 450 psi, attempt to pick up to neutral, Pulling up hole to 9008, CT Wt to 38 k lbs, Pulling up hole. RBIH to 9012 slip oriented at 330 ROHS. Pump at 1.5 bpm, shear at 5,815 psi. WOB to 12 k lbs, good set 8,161.0 9,012.0 5/21/2022 01:33 5/21/2022 03:33 2.00 PROD1, DRILL TRIP P PU Wt 59 k lbs, POOH, review Welllink RT with crew, Pumps down but not bled off completely when EDC closed. Residual pressure with Bingham fluid in coil pressuring up setting tool. Continue out of hole. Clean trip. light mud coming back, export to the tiger tank, 6 bbls, bring mud back inside - good. Park shallow, open EDC, continue out of hole. 9,012.0 60.0 5/21/2022 03:33 5/21/2022 04:45 1.20 PROD1, DRILL PULD P PUD BHA #9, OHAB setting assembly, 60.0 0.0 5/21/2022 04:45 5/21/2022 06:00 1.25 PROD1, DRILL PULD P PD BHA #10, L1 lateral drilling assembly 0.0 77.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/26/2022 Page 8/14 2M-22 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/21/2022 06:00 5/21/2022 07:30 1.50 PROD1, DRILL TRIP P RIH with BHA# 10 Lateral Drilling Assembly .6° AKO xtreme motor w/ HYC A3 , Surface test agitator 1.8 bpm PP 4801 DP 1031 77.0 8,145.0 5/21/2022 07:30 5/21/2022 07:42 0.20 PROD1, DRILL DLOG P Log K1 for +2' correction PU Wt. 51K 8,145.0 8,174.0 5/21/2022 07:42 5/21/2022 08:30 0.80 PROD1, DRILL TRIP P RIH dry tag TOB @ 9000' dry 8,174.0 9,000.0 5/21/2022 08:30 5/21/2022 09:45 1.25 PROD1, DRILL KOST P OBM F/8999.04 T/ 9001.5 1.8bpm 4880pp 950 diff 9,000.0 9,001.5 5/21/2022 09:45 5/21/2022 10:30 0.75 PROD1, DRILL DRLG P Drilling Ahead F/ 9001.5 T/ 9045' 1.8 bpm 4880pp 950diff Ann 4223 PU Wt. 60K 9,001.5 9,045.0 5/21/2022 10:30 5/21/2022 11:15 0.75 PROD1, DRILL WASH P Packing off , pick up and wash back to window cleaning the build 9,045.0 8,300.0 5/21/2022 11:15 5/21/2022 11:45 0.50 PROD1, DRILL TRIP P Trip back to bottom 8,300.0 9,045.0 5/21/2022 11:45 5/21/2022 16:00 4.25 PROD1, DRILL DRLG P BOBD F/ 9045 T/ 9400 1.82 bpm 5000pp 1072 diff Ann 4092 ROP 150-180 ft/min Coil wt. 6K DHWOB 1.6K 9,045.0 9,400.0 5/21/2022 16:00 5/21/2022 16:24 0.40 PROD1, DRILL WPRT P PU Wt 72 k lbs, 8.986, WOBtug to -1 k above billet Wiper to window, neg WOB tugs @ 8,380' 9,400.0 8,352.0 5/21/2022 16:24 5/21/2022 17:00 0.60 PROD1, DRILL WPRT P RBIH 8,360 WOB to 4 k lbs 8,380' WOB to 2 k lbs Clean below 8,485' 8,352.0 9,400.0 5/21/2022 17:00 5/22/2022 00:00 7.00 PROD1, DRILL DRLG P CT 4,686 psi @ 1.82bpm in and 1.81bpm out, BHP 4,135 psi, WH 713 psi, IA 849 psi, OA 760 psi, Free spin 912 psi. Targeting 12.7 ppg EMW at the window, showing 13 ppg at the bit. 9,677 PU Wt 85 k lbs 9740 PU Wt 95 k lbs, RBIH, diff - 985 psi diff found bottom found bottom 9736.6' -3.4' 9796 PU Wt 91 k lbs, RBIH 9,400.0 9,796.0 5/22/2022 00:00 5/22/2022 00:42 0.70 PROD1, DRILL WPRT P Jog while 5x5 exits, PUH at 65 k lbs Ct Wt on wiper to window Pull -1 k WOB @ 8,980' - above billet Some motor work and - WOB to -1.4 k from 8400 to window Window clean, 0.4 bbls cuttings returned on the trip. 9,796.0 8,271.0 5/22/2022 00:42 5/22/2022 01:12 0.50 PROD1, DRILL WPRT P Jog the 7" as 5x5 exited the bit. Chase sweep to surface. 8,200' - Stacked weight ~8,278', WOB to 7 k, pumping 1.7 bpm 8,271.0 8,136.0 5/22/2022 01:12 5/22/2022 01:24 0.20 PROD1, DRILL DLOG P Tie in for a + 19' correction. 8,136.0 8,182.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/26/2022 Page 9/14 2M-22 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/22/2022 01:24 5/22/2022 01:48 0.40 PROD1, DRILL TRIP P RBIH Set down in window at 8,299' WOB to 7 k lbs Pick up 57 k, clean spin the bit, RBIH Set down again in window @ 8,299' Pick up 57 k clean, spin the bit orient 20° left RBIH Set down in window @ 8,299, WOB 7 k lbs, pick up 57 k up spin bit orient 20° right RBIH Set down in window at 8,299' WOB 7 k lbs, PU 57 k clean PUH 8,182.0 8,263.0 5/22/2022 01:48 5/22/2022 02:12 0.40 PROD1, DRILL DLOG T PUH and log K1 again for no correction. Park, open EDC. - consult with engineering 8,263.0 8,176.0 5/22/2022 02:12 5/22/2022 03:48 1.60 PROD1, DRILL TRIP T POOH pumping 2 bpm, holding 12.7 ppg EMW at the window. 8,176.0 78.0 5/22/2022 03:48 5/22/2022 05:18 1.50 PROD1, DRILL PULD T PUD BHA #10 ** Bit grade out 1-2-BT-S-X-I-WT-BHA - heavy damage to reamers, looks we stuck it in the window while pumping. 78.0 0.0 5/22/2022 05:18 5/22/2022 06:18 1.00 PROD1, DRILL PULD T PD BHA #11, window dressing assembly. 0.0 78.0 5/22/2022 06:18 5/22/2022 08:00 1.70 PROD1, DRILL TRIP T Tag up space out RIH w/ .6° AKO Drilex motor and NS Crayola Mill 78.0 8,145.0 5/22/2022 08:00 5/22/2022 08:12 0.20 PROD1, DRILL DLOG T Log K1 for +1' Correction // Close EDC and perform PU Wt. 53K 8,145.0 8,175.0 5/22/2022 08:12 5/22/2022 08:48 0.60 PROD1, DRILL TRIP T RIH to window clean pass through @ HS // Confirm RA tag @ 8293' // Drift past 8375' cleaning up hard spot @ 8351' // Overpull @ 8300' -2K DHWOB run down clean 8,175.0 8,290.0 5/22/2022 08:48 5/22/2022 10:48 2.00 PROD1, DRILL REAM T Perform reaming passes in windwo HS, 30L, 30R, LS 8,290.0 8,290.0 5/22/2022 10:48 5/22/2022 12:18 1.50 PROD1, DRILL TRIP T POOH for ER lateral assembly 8,380.0 78.0 5/22/2022 12:18 5/22/2022 13:33 1.25 PROD1, DRILL PULD T Tag up space out // PJSM for Un- deploy // PUD BHA #11 Crayola Assembly // 78.0 0.0 5/22/2022 13:33 5/22/2022 14:18 0.75 PROD1, DRILL BOPE T Function Test BOP's 0.0 0.0 5/22/2022 14:18 5/22/2022 15:18 1.00 PROD1, DRILL PULD T PD BHA #12 ER Lateral Assembly // Shallow test agitator 1.8 bpm 4782pp 962 diff // 0.0 78.0 5/22/2022 15:18 5/22/2022 16:51 1.55 PROD1, DRILL TRIP T RIH - shallow test agitator 967 psi @ 1.8 bpm 78.0 8,150.0 5/22/2022 16:51 5/22/2022 17:03 0.20 PROD1, DRILL DLOG T Tie into K1 for a +2 correction, PU Wt 51 k lbs, 8,150.0 8,167.0 5/22/2022 17:03 5/22/2022 17:21 0.30 PROD1, DRILL DLOG T RIH and park at 8,260.4 MD - 6051.24' TVD Trap 4018 psi - 12.77 ppg EMW Observe bottom hole pressure bleed to 4000 psi over 10 minutes - 12.71 ppg Bleed wellhead from 1,173 psi to 974 psi, Bottom hole pressure dropped to 12.69 psi breifly and then rebounded to 4,000 psi of 12.71 ppg EMW 8,167.0 8,260.0 5/22/2022 17:21 5/22/2022 17:27 0.10 PROD1, DRILL TRIP T RIH, window clean 8,260.0 8,320.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/26/2022 Page 10/14 2M-22 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/22/2022 17:27 5/22/2022 18:15 0.80 PROD1, DRILL TRIP P WOB bobbles 1-2 k lbs at typical 8,349' and 8,385' WOB bobbls to 6 k lbs, starting at 8,476' to set down at 8,488'. PU Wt 54 k lbs, RBIH cutting pumps, pass through area. Billet clean, remianing trip in hole clean. Carried 6 k CT Wt to bottom. 8,320.0 9,796.0 5/22/2022 18:15 5/22/2022 19:39 1.40 PROD1, DRILL DRLG P Set parameters. WH 736 psi, IA 836 psi, OA 652 psi, CT 4992 psi @ 1.82 bpm in and 1.82 bpm out, BHP 4150 psi, Free spin diff 959 psi, Quick pick up weight above bottom 62 k lbs. OBD, CT Wt - 4 k lbs, WOB 0.7 k lbs. Pumping 5x5 and 10x10 sweeps as needed. Note found bottom at 9,807'. 9,853' PU Wt 72 k lbs. Adding 1.5% Low torque to mud system 9,796.0 9,863.0 5/22/2022 19:39 5/23/2022 00:00 4.35 PROD1, DRILL DRLG P Drilling break, reacquired sand, A4 pay, parameters improved. CT Wt 0.8 k lbs, WH 658 psi, IA 849 psi, OA 786 psi, CT 5,131 psi, ROP 40-180 ft/hr 9,880' PU Wt 72 k lbs. 9,902' PU Wt 70 k lbs. ~ 9900' Geo asked for 88 °, rolling over - hard spot 9,958' - A6/A5 top to 9,662' Drew down High vis sweep pit, switched to 2 ppb drill beads in active mud. Targeting 12.7 ppg @ the window, 13.1 ppg EMW at the bit. 10,017' PU Wt 72 k lbs 10,037' PU Wt 83 k lbs 9,863.0 10,096.0 5/23/2022 00:00 5/23/2022 00:15 0.25 PROD1, DRILL DRLG P OBD, 10,085' PU Wt 85 k lbs. 10,096.0 10,106.0 5/23/2022 00:15 5/23/2022 00:33 0.30 PROD1, DRILL DRLG P PU on wiper trip due to second heavy pick up in a row. Wiper number #1 pulled after ~ 300' drilled - pulled ~ 100' early PU Wt 85 k lbs, broke back to 63 k lbs, 9,509' slight tug on WOB w 60 psi motor work 10,106.0 9,362.0 5/23/2022 00:33 5/23/2022 00:48 0.25 PROD1, DRILL DRLG P RBIH as bead sweep exits the bit Carried 7 k Ct Wt to bottom at 1.48 bpm in and 1.76 bpm out. 9,362.0 10,106.0 5/23/2022 00:48 5/23/2022 03:00 2.20 PROD1, DRILL DRLG P Set rate, WH 653 psi, IA 852 psi, OA 840 psi, CT 5030 psi @ 1.79 bpm in & 1.74 bpm out, BHP 4191 psi, free spin dif 920 psi, CT Wt -4 to 0, WOB 1 k lbs Drilled out of sand @ 10,100' 10,115' PU Wt 85 k lbs 10,177 PU Wt 85 k lbs 10,193 PU Wt 80 k lbs 10,106.0 10,212.0 5/23/2022 03:00 5/23/2022 03:54 0.90 PROD1, DRILL WPRT P PU Wt 70 k lbs 1.2 k tug at 8985' - possibly + 15' correction and saw top of billet 8,481' start of trouble spot, motor work,WOB to -1 k lbs. 8386' WOB to -3 k lbs, ST to 70 k lbs, 6 k over. Window clean 10,212.0 8,259.0 5/23/2022 03:54 5/23/2022 04:06 0.20 PROD1, DRILL WPRT P PUH to logging depth 8,259.0 8,135.0 5/23/2022 04:06 5/23/2022 04:12 0.10 PROD1, DRILL DLOG P Tie into the K1 for a +12' correction. 8,135.0 8,171.4 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/26/2022 Page 11/14 2M-22 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/23/2022 04:12 5/23/2022 04:42 0.50 PROD1, DRILL CIRC P Jet 7", chase 5x5 sweep 8,171.4 8,260.0 5/23/2022 04:42 5/23/2022 06:00 1.30 PROD1, DRILL TRIP P RBIH, window clean, set down multiple times at 8,350, bounce through with no pumps, set down multiple times 8,493' bounce through with no pumps at 10 ft/min. Continue in hole. 8,260.0 10,212.0 5/23/2022 06:00 5/23/2022 10:30 4.50 PROD1, DRILL DRLG P OBD F/ 10212 T/ 10439 1.8 in 1.75 out 5333pp Ann 4191 10,212.0 10,439.0 5/23/2022 10:30 5/23/2022 10:45 0.25 PROD1, DRILL WPRT P 500' wiper for wt. transfer 10,439.0 10,439.0 5/23/2022 10:45 5/23/2022 12:45 2.00 PROD1, DRILL DRLG P OBD F/ 10439 T/ 10600 1.8 in 1.75 out 5333pp Ann 4191 10,439.0 10,600.0 5/23/2022 12:45 5/23/2022 14:00 1.25 PROD1, DRILL WPRT P Wiper to window clean 7" 10,600.0 8,200.0 5/23/2022 14:00 5/23/2022 14:09 0.15 PROD1, DRILL DLOG P Log K1 for +12' correction 8,200.0 8,150.0 5/23/2022 14:09 5/23/2022 14:36 0.45 PROD1, DRILL CIRC P Jet 7" casing 8,150.0 8,290.0 5/23/2022 14:36 5/23/2022 16:00 1.40 PROD1, DRILL TRIP P Trip to bottom 8,290.0 10,600.0 5/23/2022 16:00 5/23/2022 18:15 2.25 PROD1, DRILL DRLG P BOBD F/ 10600 T/10769 1.8 bpm 5325pp 998diff Ann4258 1.8 in 1.8 out 8.67ppg in 8.66ppg out 10,600.0 10,769.0 5/23/2022 18:15 5/23/2022 19:30 1.25 PROD1, DRILL WPRT P Wiper to window for pressure check +8' correction tie in K1 10,769.0 8,280.0 5/23/2022 19:30 5/23/2022 20:30 1.00 PROD1, DRILL OWFF P Pressure check @ window MD = 8280.00 TVD= 6066.09 Ann Press= 4113 13.055 Eqiv. TD called due to pressure build, building 13.4 densemax 8,280.0 8,280.0 5/23/2022 20:30 5/23/2022 21:45 1.25 PROD1, DRILL TRIP T POOH for new Resistivity Tool 8,280.0 78.0 5/23/2022 21:45 5/23/2022 23:00 1.25 PROD1, DRILL PULD T Tag up space out // PJSM // PUD BHA # 12 Lateral Drilling Assembly laydown res tool 78.0 0.0 5/23/2022 23:00 5/24/2022 00:00 1.00 PROD1, DRILL PULD T Pick up new res tool , PD BHA # 13 Lateral ER Assembly (confirm td) BHA 0.0 78.0 5/24/2022 00:00 5/24/2022 00:15 0.25 PROD1, DRILL PULD T Test Tol, BHA #13, bad test *** no comms with tool 0.0 78.0 5/24/2022 00:15 5/24/2022 01:15 1.00 PROD1, DRILL PULD T PUD BHA #13 to swap tools 78.0 0.0 5/24/2022 01:15 5/24/2022 02:45 1.50 PROD1, DRILL PULD T Swap upper Coil Trak, PD BHA #13 - good check, ERD assembly, reran same bit, stab injector, inspect pack offs, 0.0 78.0 5/24/2022 02:45 5/24/2022 03:54 1.15 PROD1, DRILL TRIP T RIH W BHA #13 Park at 500' close EDC, test agitatot, 935 psi @ 1.8 bpm, Continue in hole at min rate holding 13.1 ppg. 78.0 8,145.0 5/24/2022 03:54 5/24/2022 04:06 0.20 PROD1, DRILL DLOG T Tie into the K1 for +2.5' correction PU Wt k lbs 8,145.0 8,183.9 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/26/2022 10,769.0 TD called due to pressure build, BOBD F/ 10600 T/10769 Page 12/14 2M-22 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/24/2022 04:06 5/24/2022 05:00 0.90 PROD1, DRILL TRIP T Continue to RIH, Set down in window twice, 8,300' and 8,297' to 7 k WOB, Wash down to 8,289'. Saw small amount of motor work and WOB, PU, cut pumps and pass through window clean. S/D in traditional trouble spots, 8,355' and 8,471'. PU Wt ~ 65 k lbs. Worked pipe at various running speeds 10-50 ft/min, various pump rate from pumps off to 1.4 bpm and various tool faces with no success. 8,183.9 8,475.0 5/24/2022 05:00 5/24/2022 07:21 2.35 PROD1, DRILL TRIP T PUH to 7" pumping 1.86 bpm. Winow clean. Jet 7", park and open EDC, pooh pumping 2.45 bpm. 8,475.0 78.0 5/24/2022 07:21 5/24/2022 08:51 1.50 PROD1, DRILL PULD T PUD BHA #13. Bit out at 1-4-bt-g-x-i-l-hp - note two runs on this bit 78.0 0.0 5/24/2022 08:51 5/24/2022 10:09 1.30 PROD1, DRILL PULD T PD BHA #14, clean out assembly, NOV agitator, 0.6° motor with D331 bit. NG 2.80", Stab injector, check pack offs, bump up, set counters. 0.0 78.0 5/24/2022 10:09 5/24/2022 11:36 1.45 PROD1, DRILL TRIP T RIH with BHA #14, 78.0 8,145.0 5/24/2022 11:36 5/24/2022 11:48 0.20 PROD1, DRILL DLOG T Tie into the K1 for a +1' correction, Close EDC, PU Wt 54 k lbs, 8,129.0 8,218.0 5/24/2022 11:48 5/24/2022 12:00 0.20 PROD1, DRILL DLOG T Park @ 8,231.1 MD adn 6029.21 TVD, trap 4,132 psi, observ fall and pleateu at 4,103 psi. - 13.08 ppg EMW - aka 13.1 ppg 8,218.0 8,231.1 5/24/2022 12:00 5/24/2022 13:21 1.35 PROD1, DRILL WASH T RIH, down on pumps through window - clean, S/D @ 8,373 6 times. Work down hole slowly at 1.25 bpm, to 8486' where WOB was building with out good motor workk feedback. 8,231.1 8,486.0 5/24/2022 13:21 5/24/2022 14:03 0.70 PROD1, DRILL WASH T PU Wt 65 k lbs, PUH to 8358 at 1.8 bpm, turn around, cut rate to 1.25 bpm, work back down to 8487. Stacking out, 8,486.0 8,487.0 5/24/2022 14:03 5/24/2022 16:21 2.30 PROD1, DRILL WASH T PU Wt 65 k lbs, pull at 1.86 bpm up through window - clean. Turn around at 8,388'. Attempt to RBIH, set down in window. PU and wash though window, chase high vis sweep around whill washing back into 7". Chase sweep to tubing tail. Tie in 8,487.0 8,162.0 5/24/2022 16:21 5/24/2022 16:27 0.10 PROD1, DRILL WASH T Tie in for +6.5' correction. 8,162.0 8,169.0 5/24/2022 16:27 5/24/2022 17:57 1.50 PROD1, DRILL WASH T RIH through window, Pumping 1.85 ppg, 880 psi free spin. cut pump to pass 8,350 trouble spot, stacked out a 8,339'. PU Wt 61 k lbs, back on the pump, RIH, 8,493' stall, PU Wt 61 k lbs, RBIH, massive unload of cuttings at the shaker, MM out 9.2 ppg. Stall again at 8493' PU restart, Massive unload of mostly whole frac sand at the shaker. 8,162.0 8,493.0 5/24/2022 17:57 5/24/2022 19:21 1.40 PROD1, DRILL WASH T Pu Wt 53 k lbs, Inc reading 35 °... Sweep back to the window. Jet the can. Confirm with DGS and NBI (HOT) inc to be at ~38° PUH, discuss with town team plan forward 8,493.0 8,493.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/26/2022 Page 13/14 2M-22 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/24/2022 19:21 5/24/2022 19:39 0.30 PROD1, DRILL WASH T Found Original hole, NBI and DGS reading 91° Confer with town team Clean 7" with sweeps PUH to log 8,493.0 8,305.0 5/24/2022 19:39 5/24/2022 19:57 0.30 PROD1, DRILL WASH T Log the RA marker, 8,293' 8,305.0 8,326.0 5/24/2022 19:57 5/24/2022 21:09 1.20 PROD1, DRILL WASH T Confer with town team 8,326.0 8,145.0 5/24/2022 21:09 5/24/2022 21:27 0.30 PROD1, DRILL WASH T Log the K1 marker +4' correction 8,145.0 8,155.0 5/24/2022 21:27 5/24/2022 21:57 0.50 PROD1, DRILL WASH T Pass through window x 3 clean into original well bore. DGS ~91°, NBI (HOT) 91° 8,155.0 8,493.0 5/24/2022 21:57 5/24/2022 23:15 1.30 PROD1, DRILL WASH T Recep pipe inside pipe, Bring pump online 1.8 bpm/5,279 psi/Diff 746 psi, BHP 4,118, WHP 684, IA 862, OA 991 Unable to pass hard spot 8,394' Waiting on orders 8,493.0 8,493.0 5/24/2022 23:15 5/25/2022 00:00 0.75 PROD1, DRILL CIRC P Pull above window and wait on KWF 8,493.0 8,170.0 5/25/2022 00:00 5/25/2022 01:30 1.50 PROD1, DRILL CIRC T Continue to recep pipe waiting on completion fluid to arrive, weather very foggy, slowly making way to locaion. bring fluid into pits off of AES Truck, plugging off rock catcher screen with sticks and rocks from so called ultra clean truck, swap back and forth muliple times. 8,170.0 8,260.0 5/25/2022 01:30 5/25/2022 03:45 2.25 PROD1, DRILL CIRC T NES Truck on location, send driver to CDR3 Orientation, Continue bringing on fluid from AES Truck with continued screen problems. 8,260.0 8,260.0 5/25/2022 03:45 5/25/2022 04:09 0.40 PROD1, DRILL CIRC P Swap over to NES/Peak truck bring on addtional 75 bbls total 250 bbls into pits before sending down hole. 8,260.0 8,260.0 5/25/2022 04:09 5/25/2022 04:45 0.60 PROD1, DRILL DISP P Send 13.5 ppg to the coil. 8,260.0 8,488.0 5/25/2022 04:45 5/25/2022 07:27 2.70 PROD1, DRILL DISP P POOH, displacing wellbore to KW fluid while painting TD and window flags, @ 8,158.1' and 7878' respectively 8,488.0 124.0 5/25/2022 07:27 5/25/2022 09:00 1.55 PROD1, DRILL PULD P Park shallow, PJSM, Flow check - Good, Unstab injector and inspect pipe. Starts of a flat spot ~13' back approx 2- 3' long wall thickness 0.153" out of 0.204" original wall thickness. LD BHA # 14. Static losses - 124.0 0.0 5/25/2022 09:00 5/25/2022 10:00 1.00 COMPZ1, CASING PUTB P Prep floor for picking up liner, PJSM, new floor hand 1st time running liner. 0.0 0.0 5/25/2022 10:00 5/25/2022 11:00 1.00 COMPZ1, CASING PUTB P Pick up L1 completion, 11 joints, three pups for space out, with solid bull nose and seal bore deployment sleeve. - LOA 363.21', Kick while running liner, after4 action review. 0.0 363.2 5/25/2022 11:00 5/25/2022 11:48 0.80 COMPZ1, CASING PULD P PU BHA #15 - Liner running assembly, check pack offs 363.2 407.4 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/26/2022 PU BHA #15 - Liner running assembly, Page 14/14 2M-22 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/25/2022 11:48 5/25/2022 14:42 2.90 COMPZ1, CASING RUNL P RIH W liner - inspect and tighten tree bolts as needed. Tie into window flag for +3.71' correction, PU Wt 58 k lbs, WOB -3.59 klbs Continue in hole, Tie into formation from 8244 - 8274' for +54' correction. Did not reset counters, RIH to hard tag. TD flag 15' back. Hard bottom 8475.38' Pump 1.5 bpm, diff to 1000 psi, PU Wt 50 k lbs, WOB to 0 k lbs Released liner top - 8112.17' bottom - 8475.38' 407.4 8,475.4 5/25/2022 14:42 5/25/2022 17:30 2.80 COMPZ1, CASING DISP P Reset depth, Displace kill weight to seawater. 8.58 ppg in and 8.67 out. Park at 6267' TVD, 4477' TVD, BHP 3565 psi, 15.3 ppg Pump 20 bbls of diesel to the well while pulling out of hole. 8,475.4 4,000.0 5/25/2022 17:30 5/25/2022 19:00 1.50 COMPZ1, CASING BHAH P At surface, spaceout, PUD setting tools *** Note Final Tubing Pressure 1,644 psi 4,000.0 44.3 5/25/2022 19:00 5/25/2022 21:00 2.00 DEMOB, WHDBOP BHAH P LD tools, clean RF for rig move 44.3 0.0 5/25/2022 21:00 5/25/2022 22:00 1.00 DEMOB, WHDBOP RURD P MU Nozzle, stab INJH, jet stack and flush surface lines Load out fluild and clean pits 0.0 0.0 5/25/2022 22:00 5/25/2022 23:30 1.50 DEMOB, WHDBOP RURD P Blow down stack and surface lines to tiger tank Move Vac truck into Tiger remove fluids *** Note: borescope stack internally (all good) 0.0 0.0 5/25/2022 23:30 5/26/2022 00:00 0.50 DEMOB, WHDBOP RURD P RU to stack, perform valve checklist, lock out tag out INJH Bleed down Kommey Unit Rig release 5-25-22 24:00 - midnight 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/26/2022 RIH to hard tag. , Released liner top - 8112.17' bottom - 8475.38' RIH W liner !" #$ #%& 50-103-20170-60 '( ) ( &%$ ( *+ ( ( , -. /( /0( #$( !"#$% &"'( .(0 ()*'+ # (!"#$% &"'( ( ,++ * # )( 1)( ' # 2( ))(+-.&)/0 + ( -.&11( 2 3++ 2 + 4%" + 5,++ 0 550 0+0 / / &.$( &$( 3 .( .( 435%/ 45% ! 1$&( %$% %$% '2-"62-6'$.. "6627""$"% %'$%/$3( %$% .%8#96$'6' '%8'97-$7#", /0 678 9$. 6*8 ) . 678 #$)#. :;;% '<-<% '$% 6%$#% '.2#$7%6#%'- (+ ( $ ( . $% * +( 9)6*+8 6 8 45% 6 8 678 435%/ 6 8 *: (62-6$ %$%%%$%%$%"$% 9) 6 8 .) *)6/08 * 6 8 #<#<% ;* 03+ = 5 ;* + 3'%$6 62'-$% :;*&(.<6<-->%% ,1,; 1,;, 626.$% 62-6$ :&:('<-<%6>7%>% ,1,; 1,;, -2%%%$% %2.#-$% &('<"<%>77> # 6 8 ; 678 < 678 435%/ 6 8 45% 6 8 *+ 6 8 *+ 6 8 # . 6 8 # 3 . 6 8 + 6 8 & 675=8 *) 62-6$ -%$ 7%-$## #2'%$ 72.'$7 72'7$7#2%%"$ '2-"'2#'$" "-26#$# "$% "2-%6$-7 ,1,;&( *%% )#%&, -2%%%$% 6-$"- 7%6$-6 #2'%$ 72.%7$7 72'%6$.#2%%"$ '2-"'2..$" "-26".$% '$7 "26-%$- ,1,;&7( :%* , -2%7$# -$"7 7%$ #2"-$# 72#67$ 72"6"$"#2%%7$# '2-"'2-.$' "-26$. %$% "26'-$# ,1,;&7( -2%'-$6 -"$ 7%$. #2"6$% 72##'$% 72"#$-#2%%$% '2-"'27'$6 "-26%$7 #$. "267$"6 ,1,;&7( -2%6-$" -7$6. 7%$ #2"'$- 72#"'$6 72""%$"'2---$- '2-"'277'$% "-2..6$6 $ "26%$" ,1,;&7( -2'$" -7$%' 7%-$%. #2""$7 72#-$7 72"%$''2--6$7 '2-"'27'$# "-2.'6$- '$" "2..#$6. ,1,;&7( -2"-$7 -$6. 7%.$7" #2"$6 72#%6$7 727-7$6'2--#$6 '2-"'27.$# "-2.7$7 #$ "2."7$- ,1,;&7( -26%$' 6-$- 7%7$". #2"$" 72'-%$ 727#6$"'2--#$" '2-"'27-%$. "-2.%#$- 7$- "2.$# ,1,;&7( -2-$- 6-$#7 7%%$6. #2"$' 72'#-$7 7277'$'2--#$' '2-"'2"$. "-2#.7$# #$# "2#.$66 ,1,;&7( -2"-$' 6.$. -.$- #2"7$7 72''"$. 727%-$7'2--.$7 '2-"'2"#$7 "-2#".$6 $6 "2#"7$# ,1,;&7( '( ) ( &%$ ( *+ ( ( , -. /( /0( #$( !"#$% &"'( .(0 ()*'+ # (!"#$% &"'( ( ,++ * # 6 8 ; 678 < 678 435%/ 6 8 45% 6 8 *+ 6 8 *+ 6 8 # . 6 8 # 3 . 6 8 + 6 8 & 675=8 *) -26%$% 6-$# -.$"% #2""$ 72'"%$# 726$7'2--6$ '2-"'2""%$" "-2#%$- #$6 "2#$-% ,1,;&7( -27%-$6 6-$66 -6$' #2""$' 72'#$. 72'#$%'2--6$' '2-"'2"'"$" "-2'-"$# 7$7 "2'67$% ,1,;&7( -27""$. -%$%7 -#$'. #2""$' 72'%$# 72"$-'2--6$' '2-"'2".%$' "-2'#7$' "$' "2'"6$# ,1,;&7( -27#-$. -%$7" -"$.# #2""$" 72"--$6 72%$"'2--6$" '2-"'2"6$7 "-2'"$ .$" "2'7$7 ,1,;&7( -27--$- 66$# -$7% #2""$. 72"66$% 72."$#'2--6$. '2-"'2"-7$ "-2'7$7 $6 "2"-7$77 ,1,;&7( -2"7%$% 6-$- 6.$6" #2"'$ 72"..$- 72"#$'2---$ '2-"'2'%7$7 "-2"6"$- $. "2"#7$#- ,1,;&7( -2"'-$ -%$67 6.$7' #2"'$ 72"#-$ 726$"'2---$ '2-"'2'$ "-2"'.$ '$' "2"7'$ ,1,;&7( -2"-#$7 6-$7' 67$.- #2"'$ 72"'-$ 72%6$.'2---$ '2-"'2'$ "-2"$" %$" "27--$7 ,1,;&7( -2'$ -$"- 6"$7 #2""$. 72"'7$ 72%'6$#'2--6$. '2-"'2'6$7 "-27-.$7 $6 "27.'$7# ,1,;&7( -2'"%$# -$-. 67$"' #2""$% 72""6$' 72%7-$6'2--6$% '2-"'2'7$- "-27.6$' '$ "27'#$.' ,1,;&7( -2''%$' -$- 6$.7 #2"7$. 72""#$ 72%7%$'2--.$. '2-"'2'7'$ "-27#6$6 %$% "27".$" ,1,;&7( -2'67$. -$-" 6$76 #2"$6 72"7-$7 2--.$#'2--#$6 '2-"'2'"$ "-277#$" "$' "27'$#. ,1,;&7( -2#%$# -$. 6$ #2"$- 72"7"$ 2-.$7'2--'$- '2-"'2'".$' "-27%$ $7 "2-%$7 ,1,;&7( -2#"%$7 -$. 67$6" #2"$% 72".$# 2-"$7'2--'$% '2-"'2''7$- "-26$ -$ "2#$-' ,1,;&7( -2##-$ -$.' 67$." #2"%$ 72"%$. 2-"$'2--"$ '2-"'2'#%$- "-2'7$% %$" "27"$. ,1,;&7( -2.%$" -"$'6 6#$"% #27.$- 72"%$ 26."$''2--$- '2-"'2'.$# "-27$" -$" "2-"$"# ,1,;&7( -2.7%$" -'$6' 6'$'' #27#$ 72"%"$# 26''$"'2--%$ '2-"'2'..$ "-2-"$ .$# "2.'$' ,1,;&7( -2.#.$7 -.$# 6"$%. #27$. 727-'$ 26-$-'2-6'$. '2-"'2'6#$' "-2'6$6 #$ "27-$.7 ,1,;&7( -2.-"$% -.$.' 6'$.7 #26$ 72766$" 2.-"$"'2-6$ '2-"'2'-7$" "-277$7 #$ "2"$ ,1,;&7( -26'$ -#$7- 66$76 #2"$7 727.-$7 2.#"$.'2-.6$7 '2-"'2#%$' "-2%7$# -$' "2%67$-- ,1,;&7( -26''$# -7$'% -%$7 #2$. 727#-$7 2.7#$'2-.'$. '2-"'2#$# "-2%.'$ $" "2%'"$7 ,1,;&7( -266'$ -7$% -$"# #2%$% 727'6$' 2.%6$.'2-."$% '2-"'2#7$" "-2%".$# .$" "2%'$%7 ,1,;&7( -2-'$' -7$- -#$%" #26$" 727"#$ 2#6$'2-.$" '2-"'2#7'$- "-2%%$% $6 72--"$- ,1,;&7( -2-"'$# 6-$7' -.$# #2.$. 7277$' 2#'"$7'2-.$. '2-"'2#"-$' "-%2--7$ 7$6 72-#"$- ,1,;&7( -2-.'$7 6#$6- --$- #26$. 7276$" 2#6$'2-.$. '2-"'2##7$# "-%2-#.$ -$6 72-7'$" ,1,;&7( %2%%#$ 6.$ 7%$7' #2%$7 727%$6 2#%$''2-."$7 '2-"'2#.-$ "-%2-"%$' .$% 72-%"$7' ,1,;&7( %2%7'$# 6.$## 7%$- #2$# 726.$7 2'.#$.'2-.'$# '2-"'2#-"$- "-%2-'$. '$. 726.'$%- ,1,;&7( %2%.%$# 66$"- 7%.$%" #2$6 72#.$ 2'"6$%'2-.#$6 '2-"'2.'$% "-%266.$ $% 726"%$ ,1,;&7( %2%-6$% 66$# 7%-$" #27$# 72'%$ 2'#$"'2-..$# '2-"'2.7$% "-%26#'$# 6$6 7267$%. ,1,;&7( %27-$% 6-$.' 7%.$. #2"$" 72"$6 2"-"$7'2-.6$" '2-"'2.'.$" "-%2677$' #$' 72..$'6 ,1,;&7( %26$% 66$6% 7%"$#' #2"$- 72--$# 2"'-$''2-.6$- '2-"'2.6$. "-%2.-6$. #$' 72.-$6% ,1,;&7( %2%'$- 6.$" 7%"$76 #2'$. 726#$% 2"7-$-'2-.-$. '2-"'2.-#$7 "-%2..-$ '$- 72.%#$% ,1,;&7( %2"%$" 6'$6' 7%$"6 #2.$. 72#.$7 2"%$-'2-6$. '2-"'26'$ "-%2.'%$ -$' 72#.$'. ,1,;&7( %2.#$6 6.$'. 7%%$%- #2-$6 72"6$. 27.-$.'2-67$6 '2-"'2677$. "-%2.-$% #$ 72#7'$ ,1,;&7( %27%'$. 6.$66 --$%7 #27$% 727"$' 27'"$#'2-6'$% '2-"'26"6$% "-%2#-7$- 7$6 72#%#$76 ,1,;&7( %277'$" 6-$ -6$% #27$. 72%$7 276$''2-6'$. '2-"'26#$ "-%2##.$- '$" 72'.#$.7 ,1,;&7( %27.%$" -%$- -#$-% #27$. 72%"$ 2-.$''2-6'$. '2-"'26.6$" "-%2#7#$6 #$ 72'"$.7 ,1,;&7( %2"%%$ -%$#" -"$6" #27$7 72%-$ 2.%$#'2-6'$7 '2-"'26-$" "-%2#%$% .$% 72'$-6 ,1,;&7( %2"'$# -7$7 -'$7% #27%$" 72%6%$" 2".$.'2-6"$" '2-"'2-%$ "-%2'6.$ %$. 72"6#$.7 ,1,;&7( %2"''$. -$' -7$' #2-$% 72%#6$% 2%$'2-67$% '2-"'2-"$# "-%2''-$# .$6 72"'#$.# ,1,;&7( '( ) ( &%$ ( *+ ( ( , -. /( /0( #$( !"#$% &"'( .(0 ()*'+ # (!"#$% &"'( ( ,++ * # 6 8 ; 678 < 678 435%/ 6 8 45% 6 8 *+ 6 8 *+ 6 8 # . 6 8 # 3 . 6 8 + 6 8 & 675=8 *) %2"6'$. -$7 -7$' #26$ 72%'#$ 2-$.'2-6$ '2-"'2-#$# "-%2'7$ 7$ 72".$%% ,1,;&7( %2''$6 -%$ -#$7 #2.$. 72%"7$" 2#'$"'2-6$. '2-"'2-7-$7 "-%2'%"$- -$- 727-.$% ,1,;&7( %2'"'$. 6-$7 -6$'" #2.$- 72%-$. 276$-'2-6$- '2-"'2-'7$ "-%2".6$7 6$% 727#.$7 ,1,;&7( %2'6$% 6-$%' 7%%$". #26$" 72%$6 2%.$"'2-6$" '2-"'2-.$% "-%2""#$- '$" 7277%$-" ,1,;&7( %2#$" 6-$#- 7%$'7 #26$. 2--#$. 2%6$'2-6$. '2-"'2-6#$ "-%2"$. "$ 727%$'7 ,1,;&7( %2#7'$. 66$-# 7%%$6# #2-$% 2-6"$ 2%#$7'2-67$% '2-"'2--6$6 "-%2"%%$- "$ 72..$- ,1,;&7( %2##'$# 66$-7 --$# #2-$' 2-#-$ 2%7'$"'2-67$' '2-"#2%7$6 "-%27.'$% '$" 72".$7% ,1,;&7( %2#6'$7 -%$ 7%%$7- #2-$. 2-'-$7 2%6$"'2-67$. '2-"#2%7$# "-%27'6$% 6$7 72.$#% ,1,;&7( %2.'$. -%$6 -6$% #2-$# 2-""$" 2--$-'2-67$# '2-"#2%76$' "-%277$' .$ 72-.$ ,1,;&7( %2.7'$ 66$-' -.$" #2-$6 2-7'$" 2-."$#'2-67$6 '2-"#2%".$. "-%27"$7 .$' 72..$.. ,1,;&7( %2.#-$% 66$-' -.$" #27%$" 2--$6 2-""$#'2-6"$" '2-"#2%#7$7 "-%26"$7 %$% 72"7$-. ,1,;&7( '* !" #$ #%&' 50-103-20170-70 () * ) &%$ ) +, ) ) ' -. /) /0) #$)! ! "#$%& '#() .) 0 )*+(, # )"#$%& '#() ) -,, + # *) 1*) ( # 2) **),./'*01 , ) ./'22) 3 4,, 3 , 5&# , 6-,, 1 661 1,1 / / &.$) &$) 3 .) .) 435%/ 45% ! 1$&) &%& &%& (3.#73.7(%// #7738##%#& &(%&/$3) &%& /&9$:7%(7( (&9(:8.%8$#- /0 678 9$. 6+8 * . 678 #$*#. ;;& (<(<& (%& 7&%$ (/3$%/.(#(#.7 ), ) $ ) . %& + ,) 9*6+,8 6 8 45% 6 8 678 435%/ 6 8 +: )73(.%& &%&&&%&&%&#%& 9* 6 8 .* +*6/08 + 6 8 $<$<& ;+ 14, != 6 ;+! , 4(&%7 73(.%& ;+')/<7<..>&& -2-; 2-;- 737/%& .3..&%& ' )(<.<&7>8&>& # 6 8 ; 678 < 678 435%/ 6 8 45% 6 8 +, 6 8 +, 6 8 # . 6 8 # 3 . 6 8 , 6 8 & 675=8 +* 73(.%& #&%# 87%/. $3&7/% 8377% 838&8%/(3.#% (3.#(3&.7%. #.3$#%/ %( #37&%# -2-;') +%% *#% 737/%& 8.%7# 8.%&# $3&7%$ 837.(%7 838(%((3.$%$ (3.#(3&7(%8 #.3$(8%( %( #37.%7 -2-;') :%+ / 738%$ #.%/7 #&%&/ $388%7 83.#%7 8388%/(3.7/%7 (3.#(3&$$% #.3$$.%/ 7%& #37#%/7 -2-;') ; $<* 738#/%( (.%.( #&%$ $3#7% 83.8&%( 838##%/$3&&% (3.#(3&(&%( #.3$7%/ #&%. #37$%7 -2-;') 7387&%8 /(%.( #%$ $3$&%# 83.(#% 838$8%$$3&#%# (3.#(3&$%7 #.3/&%( #.%& #37.&%&8 -2-;') 73#&.%/ 7$%.. #8%# $3$#%/ 83.//%# 8387%$3&7%/ (3.#(3&&8%$ #.3/.%& 8/%/ #3.$%78 -2-;') 73##&%. .%&# 8&%&( $3$(%8 #3&&&%& 83#&%#$3&.%8 (3.##3.7&%. #.3/#&%8 ##%. #3.#$%(/ -2-;') 73#/&% .&%/# $%. $3$#%7 #3&$% 83#$%7$3&7%7 (3.##3.$#%/ #.3/$#%$ ##%7 #3./(%// -2-;') 73(&% .%# &$%$7 $3$#%& #3&/%$ 83#((%($3&7%& (3.##3.(8% #.3/.8%8 88%# (3&&$%8/ -2-;') 73(8%# .8%$8 .#%88 $3$%( #3&88% 83#7(%$3&$%( (3.##3.#/%/ #.378%& #%& (3&8#%78 -2-;') () * ) &%$ ) +, ) ) ' -. /) /0) #$)! ! "#$%& '#() .) 0 )*+(, # )"#$%& '#() ) -,, + # 6 8 ; 678 < 678 435%/ 6 8 45% 6 8 +, 6 8 +, 6 8 # . 6 8 # 3 . 6 8 , 6 8 & 675=8 +* 73($&%. .#%&8 7%8$ $3$&%( #3&8%& 83(#%($3&#%( (3.##3.#7%/ #.37(%8 ##%& (3&(.%$8 -2-;') 73(.% .(%$8 $.%# $3(/%. #3&#%# 83(#8%/$3&%. (3.##3.($%8 #.377%( 8.%( (3&7%( -2-;') 73$%8 .#%78 ((%.$ $3((% #3&&%/ 83(/&%$3&&.% (3.##3.$.%. #.3.&7% ##%/ (3&./%$ -2-;') 73$(&%# .%. #8%(8 $3(8% 83..%& 83(.%8$3&&/% (3.##3.77%$ #.3.8&% #8% (3&/%&# -2-;') 73$7&%( .%#. 8%(( $3(%7 83.$7%8 83$&%7$3&&(%7 (3.#(3&% #.3.#7%/ 8$%( (3%# -2-;') 73/&%$ .%8 %($ $3(&%7 83.#%/ 83$#%/$3&&#%7 (3.#(3&87%. #.3.$%/ 88%# (3&.%.$ -2-;') 73/#&%8 .%& &%78 $3(&% 83.8%8 83$88%$3&&#% (3.#(3&$/% #.3./% 8.%( (3&8%# -2-;') 73//% .&%.( 8(7%$8 $3#.%$ 8377%$ 83$8(%7$3&&8%$ (3.#(3&./%. #.3./8%7 8.%( (3&7.%.. -2-;') 737&&%( .%& 8#7%7( $3#.% 837(8%( 83$8%$$3&&8% (3.#(3/%& #.3./&%/ 88%# (3&/%$. -2-;') 7378%/ 7.%$& 887% $3#7%. 8378%$ 83$8%/$3&&%. (3.#(3(/%& #.3.$%7 8#%/ (3&(&%& -2-;') 737$% 77%#8 8$%# $3#.%# 83/./%$ 83$&%&$3&&8%# (3.#(378%& #.3.#7% #&%7 (3&(%&. -2-;') 737.%& 7/%.# 8(%# $3(&%8 83//#%( 83(.%$3&&#%8 (3.#(3&$%& #.3..%# 8$%& #3../%8 -2-;') 73.%. .&%(( 8&%&7 $3(&%/ 83/(8%$ 83($7%($3&&#%/ (3.#(3/%& #.3.&$%/ .%8 #3.$/%8 -2-;') 73.(%& .&%7$ 8&%$. $3(&%# 83/8#%/ 83(#$%8$3&&#%# (3.#(3#(%. #.377#%$ %8 #3.87%(. -2-;') 73.7% .&% 8&.%$$ $3(&% 83/(%8 83(8%8$3&&#% (3.#(3$(%# #.37$%$ #%& #3.&7%.8 -2-;') .3&%$ 7.%&( 8&7%($ $3(&%8 83$.$% 83#..%/$3&&#%8 (3.#(37#%/ #.3787%& (%8 #37/7%7# -2-;') .3&#%& 77%// 8&/%7 $3(&%7 83$//%. 83#/$%$$3&&#%7 (3.#(38&%7 #.37#%. %/ #37#.%/$ -2-;') .3&/%& 7$%.. 8&8%($ $3(%. 83$$&%# 83#(%$3&&(%. (3.#(38&%# #.3/.&%$ (%8 #37.%77 -2-;') .3&&%( 77%& 8&%$$ $3(8% 83$##%8 83#/%($3&&/% (3.#(388$%( #.3/$(%. #%7 #3/.&%#( -2-;') .38&% 7/%7 8&%& $3(#%8 83$7%$ 83#&%8$3&&7%8 (3.#(38(% #.3/#&%/ (%$ #3/$&%// -2-;') .3$&%# 7/%( ..%. $3((%( 83$8%( 838/$%$3&&.%( (3.#(38$/%# #.3/#%/ (%7 #3/8&%$ -2-;') .3.&%/ 77%&8 ./%#$ $3($%/ 83(..% 838#.%($3&&%/ (3.#(387%. #.3$77%& $%8 #3/&&%8# -2-;') .3&%$ 77%&& .(%#( $3(/%/ 83(7(%7 838%7$3&%/ (3.#(38.(% #.3$$%# $%/ #3$/&%(7 -2-;') .3(&%. 77%$7 .8%7 $3(7%$ 83(/8%8 83.(%8$3&%$ (3.#(3#&/%/ #.3$88%7 /%( #3$#&%#( -2-;') .37&%. 77%/ .&%7$ $3(.%8 83($% 83$/%($3&8%8 (3.#(3#.%& #.3$&$%& 7% #3$&%/# -2-;') .38%& 7$%.. 77%7 $3$&%# 83((%7 838.%$3&#%# (3.#(3#.%8 #.3(//%/ 7%. #3(7%&7 -2-;') .38#&%/ 7$%#& 7$%& $3$% 83(#%. 83&%7$3&$% (3.#(3#87% #.3(#.%# .%$ #3((%8 -2-;') .38/&%$ 7$%8/ 7#%#& $3$#%& 83(8(% 837%$3&7%& (3.#(3##$% #.3(&%/ (%# #3(8%8( -2-;') .3#&&%/ 7$%7 7%&/ $3$(%. 83(7%8 83(%.$3&.%. (3.#(3#(8%& #.3#.%( /%/ #3#.#%(. -2-;') .3#8&%$ 7/% 78%#( $3$/%$ 83(%/ 838%/$3&%$ (3.#(3#(.%$ #.3#$%# (%# #3#$$%&7 -2-;') .3#$&%$ 77%.. 7(%& $3$7%/ 83(#%8 83&.#%/$3&%/ (3.#(3#$/%& #.3#88%8 7% #3#8/% -2-;') .3#.&%# .%$$ 7(%/7 $3$7%( 83(&$%# 83&$(%.$3&%( (3.#(3#/(%& #.3#&#%$ .%8 #3#&7%87 -2-;') .3(&%# .8%/( 7$%7/ $3$/% 83#.7%& 83&8/%$3&% (3.#(3#78%( #.38/(%. /%. #38/.%. -2-;') .3((&%# .(%7 7/%$& $3$#%$ 83#7.% 83&&7%$$3&7%$ (3.#(3#.%# #.38#/%8 /%8 #38(&%&/ -2-;') .3(7&%7 ./%& 7.%$# $3$% 83#/.%( 3.7&%&$3&(% (3.#(3(&%& #.387%/ /%7 #38&%( -2-;') .3$&%( .7%&# .% $3(/%8 83#$7%. 3.(%($3&%8 (3.#(3(%$ #.3.% .%8 #3.%# -2-;') .3$#&%/ .$%8. .#% $3(8%( 83#(/% 3.(%&$3&&/%( (3.#(3(#%# #.3$8%/ 7%8 #3$%$$ -2-;') .3$/% .%7. .$%/. $3(%& 83###% 37./%($3&&(%& (3.#(3(8/%( #.38$%8 #%# #38%#& -2-;') .3/&(%( 7.%/ ..%.& $3(&% 83#/%7 37$/%#$3&&#% (3.#(3((8%7 #.3&$% %. #3./%8 -2-;') .3/8&%/ 7/%/$ 8&%# $3(&%7 83##%. 37#(%$$3&&#%7 (3.#(3($$%7 #.37#%( .%7 #3/%7/ -2-;') () * ) &%$ ) +, ) ) ' -. /) /0) #$)! ! "#$%& '#() .) 0 )*+(, # )"#$%& '#() ) -,, + # 6 8 ; 678 < 678 435%/ 6 8 45% 6 8 +, 6 8 +, 6 8 # . 6 8 # 3 . 6 8 , 6 8 & 675=8 +* .3/$% 7/%88 8&%(# $3(% 838.7%. 37.%.$3&&$% (3.#(3(7%. #.3(7%7 8%. #3#%(( -2-;') .3/.&%7 7.%7( 8&#%#/ $3(%7 8387%( 3/.(%$3&&$%7 (3.#(3(..%8 #.38#%& &%/ #3%. -2-;') .37&%8 7.%$& 8&%/( $3(8%& 838$$% 3//&%$$3&&/%& (3.#(3$(%$ #.3&.%( (%. #3&7%(& -2-;') .37(%$ 7.%$. 8&%($ $3(8% 838#.%( 3/##%$3&&/% (3.#(3$8%8 #.3&78% 8%7 #3&(%( -2-;') .377$%# 7.%88 ..%8& $3(8%( 8388%. 3/#%$3&&/%( (3.#(3$(&%& #.3&(8% $%$ #3&$%## -2-;') .3.%# .&%8 ..%8& $3(8%( 838.% 3$.%#$3&&/%( (3.#(3$$%7 #.3&8&%# 8%7 83..&%#8 -2-;') .3.#(%8 .&%$( ./%// $3(8%8 838&8%# 3$$%($3&&/%8 (3.#(3$/7%$ #.3&&%( #%7 83.(/%#. -2-;') .3..&%& .&%$( ./%// $3(%7 837%$ 3$8%&$3&&$%7 (3.#(3$..%# #.&3.$%& &%& 83.%7/ -2-;') (+ T + 1 337.856-7201 1058 Baker Hughes Drive Broussard, LA 70518, USA Jun 14, 2022 AOGCC Attention: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Alaska 99501-3539 Subject:Final Log Distribution for ConocoPhillips Alaska, Inc. 2M-22L1PB1 Kuparuk River API #: 50-103-20170-70-00 Permit No: 222-034 Rig: CDR3 The final Coil deliverables were uploaded via https://copsftp.sharefile.com/ for the above well. Items delivered: Digital Las Data, Graphic Images CGM/PDF and Survey Files. Thank you. Signature of receiver & date received: Please return transmittal letter to: Jenny Jones Jenny.E.Jones@conocophillips.com Luis G Arismendi Luis.arismendi@bakerhughes.com PTD:222-034 T36699 Kayla Junke Digitally signed by Kayla Junke Date: 2022.06.17 09:25:01 -08'00' T + 1 337.856-7201 1058 Baker Hughes Drive Broussard, LA 70518, USA Jun 14, 2022 AOGCC Attention: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Alaska 99501-3539 Subject:Final Log Distribution for ConocoPhillips Alaska, Inc. 2M-22L1 Kuparuk River API #: 50-103-20170-60-00 Permit No: 222-034 Rig: CDR3 The final Coil deliverables were uploaded via https://copsftp.sharefile.com/ for the above well. Items delivered: Digital Las Data, Graphic Images CGM/PDF and Survey Files. Thank you. Signature of receiver & date received: Please return transmittal letter to: Jenny Jones Jenny.E.Jones@conocophillips.com Luis G Arismendi Luis.arismendi@bakerhughes.com PTD:222-034 T36698 Kayla Junke Digitally signed by Kayla Junke Date: 2022.06.17 09:26:26 -08'00' STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________KUPARUK RIV UNIT 2M-22L1 JBR 06/14/2022 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:0 Test Results TEST DATA Rig Rep:C Coyne / K EnfieldOperator:ConocoPhillips Alaska, Inc.Operator Rep:C Erdman/ J Newell Contractor/Rig No.:Nabors CDR3AC PTD#:2220340 DATE:5/15/2022 Type Operation:DRILL Annular: 250/2500Type Test:INIT Valves: 250/4500 Rams: 250/4500 Test Pressures:Inspection No:bopLOL220516090538 Inspector Lou Laubenstein Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 10.5 MASP: 4183 Sundry No: Location Gen.:P Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Drl. Rig P Hazard Sec.P Misc NA Upper Kelly 0 NA Lower Kelly 0 NA Ball Type 2 P Inside BOP 0 NA FSV Misc 0 NA 12 PNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 0 NACH Misc Stripper 1 2"P Annular Preventer 1 7 1/16"P #1 Rams 1 Blind/shear P #2 Rams 1 2" combi P #3 Rams 1 2 3/8" combi P #4 Rams 1 2" combi P #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 2 1/16"P HCR Valves 2 2 1/16"P Kill Line Valves 5 2 1/16"P Check Valve 0 NA BOP Misc 3 4 1/16" / Swa P System Pressure P2950 Pressure After Closure P2350 200 PSI Attained P23 Full Pressure Attained P48 Blind Switch Covers:P Nitgn. Bottles (avg):P4 @ 1800 ACC Misc NA0 P PTrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector NA NAMS Misc Inside Reel Valves 1 P 99 9 9 9 9 9 9 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Adam Klem Senior RWO/CTD Engineer ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510-0360 Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 2M-22L1 ConocoPhillips Alaska, Inc. Permit to Drill Number: 222-034 Surface Location: 5162' FNL, 4775' FEL, Sec. 27. T11N, R8E, UM Bottomhole Location: 2370' FNL, 3895' FEL, Sec. 34, T11N, R8E, UM Dear Mr. Klem: Enclosed is the approved application for the permit to drill the above referenced well. The permit is for a new wellbore segment of existing well Permit No. 192-049, API No. 50-103- 20170-00-00. Production should continue to be reported as a function of the original API number stated above. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCCwithin 90days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Jeremy M. Price Chair DATED this ___ day of April, 2022. Jeremy Price Digitally signed by Jeremy Price Date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y Samantha Carlisle at 1:43 pm, Mar 16, 2022 Adam Klem Digitally signed by Adam Klem Date: 2022.03.16 10:52:25 -08'00' ; '/% ; '/% 79' 79' %23( WHVW WR SVLJ $QQXODU SUHYHQWHU WHVW WR SVLJ $YDULDQFH WR $$& % LV JUDQWHG WR DOORZ WKH NLFNRII SDLQW WR EH DQ\ SRLQW DORQJ WKH SDUHQW ODWHUDO 97/ 66 ; ; ; '65 ; ; ; dts 4/4/2022 4/5/22 Jeremy Price Digitally signed by Jeremy Price Date: 2022.04.05 14:53:54 -08'00' !! " ## $ % &' ()*+!*'' ' ,- ! ./0 1 12&3$4# 5#6!" ,!*","" 7* $/) 3$ ' ,!, *"' )3 *8-* ,- ./0 1 1 "".!'!,) 3 ! " "! -! ' *+- "" ', *", 9 "' ) , ' ,'' -", !% & $'' : 256 1 1 $,!+ ' $ & 1 1 !* & ' ,3$ (+ !+;! ;!,, ' 2# 6 <5 # + ,. ,3!*"$"=" &' Adam Klem Digitally signed by Adam Klem Date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ompanyConocoPhillips Alaska, Inc.Well Name:KUPARUK RIV UNIT 2M-22L1Initial Class/TypeDEV / PENDGeoArea890Unit11160On/Off ShoreOnProgramDEVField & PoolWell bore segAnnular DisposalPTD#:2220340KUPARUK RIVER, KUPARUK RIV OIL - 490100NA1Permit fee attachedYes2Lease number appropriateYes3Unique well name and numberYes4Well located in a defined poolYes5Well located proper distance from drilling unit boundaryYes6Well located proper distance from other wellsYes7Sufficient acreage available in drilling unitYesDirectional plan view enclosed, no land plat in package.8If deviated, is wellbore plat includedYes9Operator only affected partyYes10Operator has appropriate bond in forceYes11Permit can be issued without conservation orderYes12Permit can be issued without administrative approvalYes13Can permit be approved before 15-day waitNA14Well located within area and strata authorized by Injection Order # (put IO# in comments) (ForNA15All wells within 1/4 mile area of review identified (For service well only)NA16Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA17Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)NA18Conductor string providedNA19Surface casing protects all known USDWsNA20CMT vol adequate to circulate on conductor & surf csgNA21CMT vol adequate to tie-in long string to surf csgNoProductive interval will be completed with uncemented slotted liner22CMT will cover all known productive horizonsYes23Casing designs adequate for C, T, B & permafrostYes24Adequate tankage or reserve pitNA25If a re-drill, has a 10-403 for abandonment been approvedYes26Adequate wellbore separation proposedNA27If diverter required, does it meet regulationsYesMax formation pressure is 4749 psig(15.1 ppg EMW); will drill w/ MPD & maintain 11.8 ppg at the window28Drilling fluid program schematic & equip list adequateYes29BOPEs, do they meet regulationYesMPSP is 4183 psig; will test BOPE to 4500 psig30BOPE press rating appropriate; test to (put psig in comments)Yes31Choke manifold complies w/API RP-53 (May 84)Yes32Work will occur without operation shutdownYes33Is presence of H2S gas probableNA34Mechanical condition of wells within AOR verified (For service well only)NoWells on 2M-Pad are H2S-bearing. H2S measures required.35Permit can be issued w/o hydrogen sulfide measuresYes36Data presented on potential overpressure zonesNA37Seismic analysis of shallow gas zonesNA38Seabed condition survey (if off-shore)NA39Contact name/phone for weekly progress reports [exploratory only]ApprDLBDate3/18/2022ApprVTLDate4/4/2022ApprDLBDate3/18/2022AdministrationEngineeringGeologyGeologic Commissioner:Date:Engineering Commissioner:DatePublic CommissionerDate-03