Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout222-075DATA SUBMITTAL COMPLIANCE REPORT API No.50-029-20813-60-00Well Name/No.KUPARUK RIV UNIT 1G-02L1 Completion Status WAGINCompletion Date 7/12/2022 Permit to Drill 2220750 Operator ConocoPhillips Alaska, Inc. MD 10507 TVD 6196 Current Status WAGIN 7/19/2023 UIC Yes Well Log Information: Digital Med/Frmt ReceivedStart Stop OH / CH Comments Log Media Run No Electr Dataset Number Name Interval List of Logs Obtained:GR/Res NoNo YesMud Log Samples Directional Survey REQUIRED INFORMATION (from Master Well Data/Logs) DATA INFORMATION Log/ Data Type Log Scale DF 8/10/20228436 10507 Electronic Data Set, Filename: 1G-02L1 GAMMA RES.las 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1_222- 075_BKR_Distribution AOGCC.docx 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1 2MD Final Log.cgm36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1 5MD Final Log.cgm36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1 5TVDSS Final Log.cgm36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 01.cgm36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 02.cgm36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 03.cgm36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 04.cgm36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 05.cgm36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 06.cgm36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 07.cgm36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 08.cgm36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 09.cgm36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 10.cgm36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 11.cgm36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 12.cgm36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 13.cgm36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1 GAMMA RES.ASC36857EDDigital Data Wednesday, July 19, 2023AOGCC Page 1 of 4 1G-02L1 GAMMA RES.las DATA SUBMITTAL COMPLIANCE REPORT API No.50-029-20813-60-00Well Name/No.KUPARUK RIV UNIT 1G-02L1 Completion Status WAGINCompletion Date 7/12/2022 Permit to Drill 2220750 Operator ConocoPhillips Alaska, Inc. MD 10507 TVD 6196 Current Status WAGIN 7/19/2023 UIC Yes DF 8/10/2022 Electronic File: 1G-02L1_PWD Digital Data_Run 01.ASC 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Digital Data_Run 02.ASC 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Digital Data_Run 03.ASC 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Digital Data_Run 04.ASC 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Digital Data_Run 05.ASC 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Digital Data_Run 06.ASC 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Digital Data_Run 07.ASC 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Digital Data_Run 08.ASC 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Digital Data_Run 09.ASC 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Digital Data_Run 10.ASC 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Digital Data_Run 11.ASC 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Digital Data_Run 12.ASC 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Digital Data_Run 13.ASC 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1 2MD Final.pdf36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1 5MD Final.pdf36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1 5TVDSS Final.pdf36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 01.PDF36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 02.PDF36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 03.PDF36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 04.PDF36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 05.PDF36857EDDigital Data Wednesday, July 19, 2023AOGCC Page 2 of 4 DATA SUBMITTAL COMPLIANCE REPORT API No.50-029-20813-60-00Well Name/No.KUPARUK RIV UNIT 1G-02L1 Completion Status WAGINCompletion Date 7/12/2022 Permit to Drill 2220750 Operator ConocoPhillips Alaska, Inc. MD 10507 TVD 6196 Current Status WAGIN 7/19/2023 UIC Yes DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 06.PDF36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 07.PDF36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 08.PDF36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 09.PDF36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 10.PDF36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 11.PDF36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 12.PDF36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 13.PDF36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1 NAD27 Definitive Survey.pdf 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1 NAD27.txt36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1 NAD83 Definitive Survey.pdf 36857ED Digital Data DF 8/10/2022 Electronic File: 1G-02L1 NAD83.txt36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1 2MD Final Log.tif36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1 5MD Final Log.tif36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1 5TVDSS Final Log.tif36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 01.tif36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 02.tif36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 03.tif36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 04.tif36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 05.tif36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 06.tif36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 07.tif36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 08.tif36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 09.tif36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 10.tif36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 11.tif36857EDDigital Data DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 12.tif36857EDDigital Data Wednesday, July 19, 2023AOGCC Page 3 of 4 DATA SUBMITTAL COMPLIANCE REPORT API No.50-029-20813-60-00Well Name/No.KUPARUK RIV UNIT 1G-02L1 Completion Status WAGINCompletion Date 7/12/2022 Permit to Drill 2220750 Operator ConocoPhillips Alaska, Inc. MD 10507 TVD 6196 Current Status WAGIN 7/19/2023 UIC Yes Well Cores/Samples Information: ReceivedStart Stop Comments Total Boxes Sample Set NumberName Interval INFORMATION RECEIVED Completion Report Production Test Information Geologic Markers/Tops Y Y / NA Y Comments: Compliance Reviewed By:Date: Mud Logs, Image Files, Digital Data Composite Logs, Image, Data Files Cuttings Samples Y / NA Y Y / NA Directional / Inclination Data Mechanical Integrity Test Information Daily Operations Summary Y Y / NA Y Core Chips Core Photographs Laboratory Analyses Y / NA Y / NA Y / NA COMPLIANCE HISTORY Date CommentsDescription Completion Date:7/12/2022 Release Date:6/28/2022 DF 8/10/2022 Electronic File: 1G-02L1_PWD Log_Run 13.tif36857EDDigital Data Wednesday, July 19, 2023AOGCC Page 4 of 4 M. Guhl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y James Brooks at 3:42 pm, Aug 15, 2022 Completed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igitally signed by James J. OhlingerDN: C=US, OU=ConocoPhillips, O=Wells - Coiled Tubing Drlling, CN=James J. Ohlinger, E=James.J.Ohlinger@cop.com Reason: I am the author of this document Location: your signing location here Date: 2022.08.11 13:38:21-08'00' Foxit PDF Editor Version: 11.2.1 James J. Ohlinger        !"#$%$&' ()*+ ,(&- .  * ,/-+ '&./, 0 1.& './2. /, 0& 340.+&.5 )/. 1.& 6. +  '&./,7 '8 0& 340.+&.5 )/. 1.&## 6. +  '&./,7 '# 9+,:;;/. <= 2 0& 30.& .+ 1.&# 0& 30$7 0& 39$7  / '*;;/.8//.'+ # #77!>77 ,? .7 8!>77,? .  887!4# ,? .# , ';.&-,  # >9# , ';.&-, 8 8 , ';.&-,   2#"# @#<7 0 ++  -/.&#<7 ; -/.&@           2#" @#<7# ; -/.&@# 0 ++  -/.&#< Last Tag Annotation Depth (ftKB) Wellbore End Date Last Mod By Last Tag:RKB 9,026.0 1G-02 5/15/2022 fergusp Last Rev Reason Annotation Wellbore End Date Last Mod By Rev Reason: Set Liner Top Packer 1G-02 7/20/2022 zembaej Notes: General & Safety Annotation End Date Last Mod By NOTE: View Schematic w/ Alaska Schematic9.0 9/15/2010 ninam NOTE: E-LINE CONFIRMED LEAKING CSM @ 8539' 1/5/2003 WV5.3 Conversio n Casing Strings Casing Description CONDUCTOR OD (in) 16 ID (in) 15.06 Top (ftKB) 27.0 Set Depth (ft… 80.0 Set Depth … 80.0 Wt/Len (lb/ft) 65.00 Grade H-40 Top Connection WELDED Casing Description SURFACE OD (in) 10 3/4 ID (in) 9.95 Top (ftKB) 26.9 Set Depth (ft… 2,375.0 Set Depth … 2,117.9 Wt/Len (lb/ft) 45.50 Grade K-55 Top Connection BTC Casing Description PRODUCTION OD (in) 7 ID (in) 6.28 Top (ftKB) 26.8 Set Depth (ft… 9,728.8 Set Depth … 6,630.6 Wt/Len (lb/ft) 26.00 Grade K-55 Top Connection BTC Tubing Strings: string max indicates LONGEST segment of string Top (ftKB) 24.5 Set Depth … 6,106.0 String Ma… 3 1/2 Tubing Description TUBING WO Set Depth (ftKB) 8,872.6 Wt (lb/ft) 9.20 Grade J-55 Top Connection BUTT AB-MOD ID (in) 2.99 Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 24.5 24.5 0.08 HANGER 8.000 MCEVOY TUBING HANGER 3.500 1,798.4 1,678.0 36.19 SAFETY VLV 5.937 CAMCO TRDP-1A-SSA SAFETY VALVE WAS LOCKED OUT 7/18/2016 2.813 8,433.2 5,841.2 50.24 GAS LIFT 5.968 CAMCO MMG 2.920 8,470.9 5,865.1 50.77 SEAL ASSY 4.000 BAKER MODEL G SEAL ASSEMBLY 2.992 8,494.3 5,879.9 51.09 PACKER 6.156 BROWN HB RETRIEVABLE PACKER 2.891 8,601.8 5,946.6 52.17 BLAST JT 4.500 STEEL BLAST JOINTS (2) 2.867 8,661.7 5,982.8 53.49 BLAST JT 4.500 STEEL BLAST JOINT PUP 2.867 8,700.3 6,005.6 54.33 PACKER 6.156 BROWN HB RETRIEVABLE PACKER 2.891 8,731.4 6,023.7 54.38 BLAST JT 4.500 STEEL BLAST JOINT (1) 2.867 8,831.2 6,081.8 54.27 NIPPLE 4.540 OTIS X NIPPLE 2.813 8,842.1 6,088.1 54.20 LOCATOR 4.000 BROWN LOCATOR SUB 3.000 8,842.9 6,088.6 54.20 PACKER 5.875 BROWN 2B PERMANENT PACKER 4.000 8,845.3 6,090.0 54.18 SBE 5.250 BROWN SEAL BORE EXTENSION 4.000 8,852.6 6,094.3 54.13 MILL 5.750 BROWN MILL OUT EXTENSION 4.750 8,864.2 6,101.1 54.06 NIPPLE 4.540 CAMCO D NIPPLE NO GO (MILLED OUT TO 2.80") MILLED OUT TO 2.80" 2.800 8,871.6 6,105.4 54.01 SOS 4.570 BROWN SHEAR OUT SUB, ELMD TTL @ 8882' during IPROF on 11/17/2002 3.005 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Des Com Make Model SN ID (in) 8,839.0 6,086.3 54.22 PACKER 2.72" Mono-Pack LTP w/ 1.78" RX Nipple (9.41' OAL / 8' From FN to RX Nipple) Norther Solutions NSP02 2 1.780 8,944.0 6,148.2 53.71 WHIPSTOCK HEW WS Northern Solutions HEW 0.000 Mandrel Inserts : excludes pulled inserts Top (ftKB) Top (TVD) (ftKB) Top Incl (°) St ati on No /S Serv Valve Type Latch Type OD (in) TRO Run (psi) Run Date Com Make Model Port Size (in) 8,433.2 5,841.2 50.24 1 GAS LIFT DMY RK 1 1/2 0.0 6/10/2003 0.000 8,532.4 5,903.8 51.48 2 INJ OPEN 1 1/2 5/15/2022 8,683.7 5,995.9 53.97 3 INJ OPEN 1 1/2 5/15/2022 8,714.7 6,013.9 54.35 4 INJ OPEN 1 1/2 5/15/2022 8,802.7 6,065.2 54.46 5 INJ OPEN 1 1/2 5/15/2022 Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft)Type Com 8,611.0 8,674.0 5,952.3 5,990.1 C-4, C-3, 1G-02 9/20/1982 12.0 IPERF 120 deg. GeoVann TCP 8,742.0 8,774.0 6,029.8 6,048.5 C-1, UNIT B, 1G -02 9/20/1982 12.0 IPERF 5" Geo Vann TCP, 120 deg. Phasing 8,992.0 9,072.0 6,176.6 6,224.5 A-4, 1G-02 1/22/1993 4.0 RPERF 2.5" Titan, 180 deg. Ph 8,996.0 9,022.0 6,179.0 6,194.5 A-4, 1G-02 9/27/1982 12.0 IPERF SOS Enerjet, 0 deg. Ph Cement Squeezes Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Des Com Pump Start Date 8,532.0 8,832.0 5,903.5 6,082.2 Cement Plug 29BBLS 15.8 PPG CLASS G CEMENT PUMPED INTO TUBING AND SQUEEZED BEHIND PIPE. 5/26/2022 8,532.0 8,832.0 5,903.5 6,082.2 Cement Plug 29BBLS 15.8 PPG CLASS G CEMENT PUMPED INTO TUBING AND SQUEEZED BEHIND PIPE. 5/26/2022 1G-02, 8/5/2022 1:23:18 PM Vertical schematic (actual) PRODUCTION; 26.8-9,728.8 RPERF; 8,992.0-9,072.0 Slotted Liner; 8,844.1-10,745.0 IPERF; 8,996.0-9,022.0 WHIPSTOCK; 8,944.0 PACKER; 8,842.9 PACKER; 8,839.0 INJECTION; 8,802.8 IPERF; 8,742.0-8,774.0 INJECTION; 8,714.7 PACKER; 8,700.3 INJECTION; 8,683.8 IPERF; 8,611.0-8,674.0 INJECTION; 8,532.4 Cement Plug; 8,532.0 ftKB PACKER; 8,494.3 GAS LIFT; 8,433.2 SURFACE; 26.9-2,375.0 SAFETY VLV; 1,798.4 CONDUCTOR; 27.0-80.0 KUP INJ KB-Grd (ft) 29.50 RR Date 9/19/1982 Other Elev… 1G-02 ... TD Act Btm (ftKB) 9,754.0 Well Attributes Field Name KUPARUK RIVER UNIT Wellbore API/UWI 500292081300 Wellbore Status INJ Max Angle & MD Incl (°) 58.38 MD (ftKB) 5,300.00 WELLNAME WELLBORE1G-02 Annotation Last WO: End Date 7/18/1988 H2S (ppm) DateComment SSSV: TRDP LOCKED OUT Casing Strings Casing Description Slotted Liner OD (in) 2 3/8 ID (in) 1.99 Top (ftKB) 9,025.6 Set Depth (ft… 10,172.0 Set Depth …Wt/Len (lb/ft) 4.60 Grade L-80 Top Connection STL Liner Details: excludes liner, pup, joints, casing, sub , shoe , float... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com Make Model Nominal ID (in) 9,025.6 Aluminum Billet Aluminum Liner Top Billet BOT Billet 1.920 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Des Com Make Model SN ID (in) 10,178.0 FISH OHAB didn;t set Baker Oil Tools OHAB 0.000 10,188.0 FISH OHAB didn;t set Baker Oil Tools OHAB 0.000 1G-02L1, 8/5/2022 1:23:18 PM Vertical schematic (actual) FISH; 10,188.0 FISH; 10,178.0 Slotted Liner; 9,025.6-10,172.0 PRODUCTION; 26.8-9,728.8 Slotted Liner; 8,844.1-10,745.0 WHIPSTOCK; 8,944.0 PACKER; 8,842.9 PACKER; 8,839.0 INJECTION; 8,802.8 IPERF; 8,742.0-8,774.0 INJECTION; 8,714.7 PACKER; 8,700.3 INJECTION; 8,683.8 IPERF; 8,611.0-8,674.0 INJECTION; 8,532.4 Cement Plug; 8,532.0 ftKB PACKER; 8,494.3 GAS LIFT; 8,433.2 SURFACE; 26.9-2,375.0 SAFETY VLV; 1,798.4 CONDUCTOR; 27.0-80.0 KUP SVC KB-Grd (ft) 29.50 RR Date 9/19/1982 Other Elev… 1G-02L1 ... TD Act Btm (ftKB) 10,507.0 Well Attributes Field Name KUPARUK RIVER UNIT Wellbore API/UWI 500292081360 Wellbore Status SVC Max Angle & MD Incl (°) MD (ftKB) WELLNAME WELLBORE1G-02 Annotation End DateH2S (ppm) DateComment Casing Strings Casing Description Slotted Liner OD (in) 2 3/8 ID (in) 1.99 Top (ftKB) 8,844.1 Set Depth (ft… 10,745.0 Set Depth …Wt/Len (lb/ft) 4.70 Grade L-80 Top Connection ST-L Liner Details: excludes liner, pup, joints, casing, sub , shoe , float... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com Make Model Nominal ID (in) 10,035.5 Deployment Sleeve NSAK 350-238 OH Permanent QCLL Northern Solution s 1.920 1G-02L1-01, 8/5/2022 1:23:19 PM Vertical schematic (actual) Slotted Liner; 8,844.1-10,745.0 PRODUCTION; 26.8-9,728.8 RPERF; 8,992.0-9,072.0 IPERF; 8,996.0-9,022.0 WHIPSTOCK; 8,944.0 PACKER; 8,842.9 PACKER; 8,839.0 INJECTION; 8,802.8 IPERF; 8,742.0-8,774.0 INJECTION; 8,714.7 PACKER; 8,700.3 INJECTION; 8,683.8 IPERF; 8,611.0-8,674.0 INJECTION; 8,532.4 Cement Plug; 8,532.0 ftKB PACKER; 8,494.3 GAS LIFT; 8,433.2 SURFACE; 26.9-2,375.0 SAFETY VLV; 1,798.4 CONDUCTOR; 27.0-80.0 KUP SVC KB-Grd (ft) 29.50 RR Date 9/19/1982 Other Elev… 1G-02L1-01 ... TD Act Btm (ftKB) 10,859.0 Well Attributes Field Name KUPARUK RIVER UNIT Wellbore API/UWI 500292081361 Wellbore Status SVC Max Angle & MD Incl (°) MD (ftKB) WELLNAME WELLBORE1G-02 Annotation End DateH2S (ppm) DateComment Page 1/10 1G-02 Report Printed: 7/14/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/30/2022 15:00 6/30/2022 19:00 4.00 MIRU, MOVE RURD P Rig down checklist, load out misc trucks and equipment , remove 4-1/16" swab valve (bad valve) from stack in prepairation of swap Secure stairs and landings, remove fuseable cap, PU and install new 4- 1/16" swab valve Stage equipment out of way 0.0 0.0 6/30/2022 19:00 6/30/2022 19:18 0.30 MIRU, MOVE DMOB P Truck on location 19:00, PJSM w NES rig move crew. 0.0 0.0 6/30/2022 19:18 6/30/2022 21:18 2.00 MIRU, MOVE DMOB P Jack the service mod, attach sow, pull outer mats and start to pull off well row. Sim-ops inspect wind-walls with manlift 0.0 0.0 6/30/2022 21:18 6/30/2022 22:18 1.00 MIRU, MOVE DMOB P Jack the sub and pull the mats. 0.0 0.0 6/30/2022 22:18 6/30/2022 23:00 0.70 MIRU, MOVE MOB P Move modules down pad 0.0 0.0 6/30/2022 23:00 7/1/2022 00:00 1.00 MIRU, MOVE MOB P Spot modules on 1G-02 0.0 0.0 7/1/2022 00:00 7/1/2022 03:00 3.00 MIRU, WHDBOP RURD P Rig spotted, Safe out rig wlkways, stairs, and emergency exits. Work cellar. Work MIRU check lists 0.0 0.0 7/1/2022 03:00 7/1/2022 06:00 3.00 MIRU, WHDBOP NUND P Nipple up BOPE, secure RF obtain RKB's, walk suface lines, MU tiger tank line, air test (good), 0.0 0.0 7/1/2022 06:00 7/1/2022 07:00 1.00 MIRU, WHDBOP CTOP P Fluid pack surface lines Sim-ops grease remaining valves 0.0 0.0 7/1/2022 07:00 7/1/2022 07:30 0.50 MIRU, WHDBOP BOPE P Shell test BOPE 250 low/3,500 high good test 0.0 0.0 7/1/2022 07:30 7/1/2022 14:00 6.50 MIRU, WHDBOP BOPE P BOPE test to 250 psi low / 3,500 psi high Witnessed by AOGCC Brian Bixby** *** Note: Rig on Highline @ 08:00am Test 1. Swab 2- Pass Test 2. Blind/Shear, BOP TV2, Charlie 4, 5, 8, &12 -Pass Test 3. BOP TV 1, Charlie 3, 7, & 11 - Pass Test 4. Manual choke D & Super choke C - Pass Test 5. Romeo 3, Bleeder 3, Tango 2, Charlie 2, & 10 - Pass Test 6. Charlie 1, 9, Bravo 5, and Tango 1 –Tango #1 Fail/Pass - install TIW test joint - Pass Test 7. Lower 2” pipe slip rams, TIW #1, Romeo 1, Bleeder 1 -Pass Test 8. Annular BOP 250/2500- Test 9. Upper 2” pipe slip rams, Bravo 6, & 8-Pass Test 10. Bravo 7 – swap out 2” test joint for 2-3/8”-Pass Test 11. 2-3/8” pipe slip rams, TIW#2 – Pass- Test 12. Draw down accumulator- 1878 N2 average // Koomy 3050 start 2350 End 19 sec to 200 42 sec to full charge 3050 psi Tested all gas detectors, pits, cellar, Verified flow alarms - PVT 0.0 0.0 7/1/2022 14:00 7/1/2022 14:30 0.50 MIRU, WHDBOP CTOP P Test inner reel valve and stripper-Pass 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 7/12/2022 Page 2/10 1G-02 Report Printed: 7/14/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/1/2022 14:30 7/1/2022 15:15 0.75 MIRU, WHDBOP CTOP P Perfrom Valve Checklist, MU PDL, walk tiger tank line, confirm valves are lined up 0.0 0.0 7/1/2022 15:15 7/1/2022 15:45 0.50 MIRU, WHDBOP CTOP P Fluid pack, PT tiger tank line and ODS PDL - the only PDL 0.0 0.0 7/1/2022 15:45 7/1/2022 16:00 0.25 MIRU, WHDBOP CTOP P Blow down test equipment, PDL and choke 0.0 0.0 7/1/2022 16:00 7/1/2022 18:00 2.00 MIRU, WHDBOP CTOP P Cut BHI UQ off, trim pipe 20', install CTC, pull test 35 k CTSW *** Note: 15,707' Coil Length 0.0 7/1/2022 18:00 7/1/2022 19:00 1.00 MIRU, WHDBOP CTOP P Head up BHI Upper Quick, test e-line, PT 3,500 psi 7/1/2022 19:00 7/1/2022 22:00 3.00 SLOT, WELLPR BHAH P PJSM, PD BHA #1, Drift/FCO wtih Drilex 0.6° ako motor and D331 0.0 64.6 7/1/2022 22:00 7/2/2022 00:00 2.00 SLOT, WELLPR TRIP P Tag up and set counters // RIH min rate EDC open. Shallow test 1.8 BPM 613 PSI diff 64.6 7,990.0 7/2/2022 00:00 7/2/2022 00:06 0.10 SLOT, WELLPR TRIP P Continue in hole 7,990.0 8,470.0 7/2/2022 00:06 7/2/2022 00:18 0.20 SLOT, WELLPR DLOG P Log K1 for -9' correction PUW=39K 8,470.0 8,500.0 7/2/2022 00:18 7/2/2022 01:06 0.80 SLOT, WELLPR TRIP P Continue in displace to milling fluid. Clean out down to 8960. Recip 7" pipe - whipstock setting area 8,500.0 8,960.0 7/2/2022 01:06 7/2/2022 02:42 1.60 SLOT, WELLPR TRIP P Trip out of well 8,960.0 51.0 7/2/2022 02:42 7/2/2022 03:42 1.00 SLOT, WELLPR PULD P Tag up - space out, PJSM, PUD BHA #1 51.0 0.0 7/2/2022 03:42 7/2/2022 05:24 1.70 PROD1, RPEQPT PULD P PJSM, PD BHA #2 NS HEW whipstock 0.0 73.0 7/2/2022 05:24 7/2/2022 07:18 1.90 PROD1, RPEQPT PULD P Tag up, reset counter depths, RIH 73.0 8,480.0 7/2/2022 07:18 7/2/2022 07:36 0.30 PROD1, RPEQPT TRIP P Log K1 marker for depth control correction of minus 10' PUW 38 k CTSW, 0 k DHWOB 8,480.0 8,520.0 7/2/2022 07:36 7/2/2022 07:48 0.20 PROD1, RPEQPT TRIP P Continue IH to setting depth 8,520.0 8,948.8 7/2/2022 07:48 7/2/2022 08:00 0.20 PROD1, RPEQPT TRIP P At depth, PU to neutral weight 35 k CTSW Stage up pressure to shear 3,700 psi Set down addtional WOB 3.5 k 8,948.8 8,940.0 7/2/2022 08:00 7/2/2022 08:12 0.20 PROD1, RPEQPT TRIP P PUH 38 k CTSW, 0.79 k DHWOB Open EDC 8,940.0 8,920.0 7/2/2022 08:12 7/2/2022 10:00 1.80 PROD1, RPEQPT TRIP P POOH 8,920.0 73.0 7/2/2022 10:00 7/2/2022 11:00 1.00 PROD1, RPEQPT BHAH P At surface, spaceout, PUD setting tools 73.0 0.0 7/2/2022 11:00 7/2/2022 12:30 1.50 PROD1, WHPST BHAH P PD BHA #3 Window Milling Assembly w/1.0° ako motor, string and window mill 0.0 77.2 7/2/2022 12:30 7/2/2022 12:42 0.20 PROD1, WHPST TRIP P Tag up, reset counter, RIH 77.2 155.0 7/2/2022 12:42 7/2/2022 13:24 0.70 PROD1, WHPST TRIP T Bring pump online up to 4,700 psi, Troubleshoot (Double Ball Valves still closed) Bleed coil pressue off POOH 155.0 77.2 7/2/2022 13:24 7/2/2022 13:54 0.50 PROD1, WHPST PULD P Tag up, spaceout, close deplyment rams Bleed pressure and blow down Brake INJH off 77.2 77.2 7/2/2022 13:54 7/2/2022 15:42 1.80 PROD1, WHPST TRIP P Tag up, reset counter, RIH 77.2 8,480.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 7/12/2022 Page 3/10 1G-02 Report Printed: 7/14/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/2/2022 15:42 7/2/2022 15:54 0.20 PROD1, WHPST DLOG P Log the K1 marker for depth control correction of minus 11' PUW=40K 8,480.0 8,524.0 7/2/2022 15:54 7/2/2022 16:06 0.20 PROD1, WHPST TRIP P Continue IH Dry tag pinch point @ 8943 PUH, 8,524.0 8,943.0 7/2/2022 16:06 7/2/2022 21:42 5.60 PROD1, WHPST MILL P Pumps on 1.84 BPM @ 3950 PSI FS, See motor work with WOB @ 8942.8 8,942.8 8,948.0 7/2/2022 21:42 7/2/2022 22:30 0.80 PROD1, WHPST MILL P Orienter unable to hold toolface. PUH and trouble shoot. RBIH to drill. Still upable to get proper reaction out of HOT. 8,948.0 8,948.0 7/2/2022 22:30 7/3/2022 00:00 1.50 PROD1, WHPST TRIP P Unable to get orienter to function properly, POOH 1302' midnight depth 8,948.0 1,302.0 7/3/2022 00:00 7/3/2022 00:18 0.30 PROD1, WHPST TRIP P Continue out of well 1,302.0 64.0 7/3/2022 00:18 7/3/2022 01:42 1.40 PROD1, WHPST PULD P On surface, PUD BHA #3 64.0 0.0 7/3/2022 01:42 7/3/2022 02:18 0.60 PROD1, WHPST BHAH P Reconfigure tool string 0.0 0.0 7/3/2022 02:18 7/3/2022 03:36 1.30 PROD1, WHPST PULD P PJSM, M/U and PD BHA #4 with replacement orienter, Make up to coil and surface test, Tag up set counters 0.0 77.2 7/3/2022 03:36 7/3/2022 05:06 1.50 PROD1, WHPST TRIP P RIH, Perform shallow test @ 250', 1.83 BPM @ 4008, Diff=713 77.2 8,480.0 7/3/2022 05:06 7/3/2022 05:12 0.10 PROD1, WHPST DLOG P Log K1 for -12' correction, PUW=34K 8,480.0 8,507.0 7/3/2022 05:12 7/3/2022 05:30 0.30 PROD1, WHPST TRIP P Continue in well 8,507.0 8,949.8 7/3/2022 05:30 7/3/2022 09:30 4.00 PROD1, WHPST MILL P Dry tag bottom 8,949.8' PUH, bring pump online 1.8 bpm/3,601 psi/Diff 490 psi, WHP 316, BHP 3,830, IA 119, OA 23 OBM 8,949.8 8,968.0 7/3/2022 09:30 7/3/2022 10:45 1.25 PROD1, WHPST REAM P Ream casing exit As milled, 30° LOHS, and 30° ROHS Dry Drift clean to 8,968' 8,968.0 8,968.0 7/3/2022 10:45 7/3/2022 13:21 2.60 PROD1, WHPST TRIP P POOH EDC Closed, pumping 1.80 bpm/4,319 psi/Diff 662, WHP 754, BHP 1,864, IA 127, OA 26 8,968.0 77.2 7/3/2022 13:21 7/3/2022 14:57 1.60 PROD1, WHPST BHAH P At surface, spaceout, PUD milling asseembly 77.2 0.0 7/3/2022 14:57 7/3/2022 17:06 2.15 PROD1, DRILL BHAH P PD whole new build section assembly w/2.4° motor. Make up to coil and surface test. Complete PD. Tag up set counters 0.0 72.2 7/3/2022 17:06 7/3/2022 18:36 1.50 PROD1, DRILL TRIP P RIH BHA #5 72.2 8,480.0 7/3/2022 18:36 7/3/2022 18:42 0.10 PROD1, DRILL DLOG P Log K1 for -11' correction, Close EDC, PUW=36K 8,480.0 8,491.0 7/3/2022 18:42 7/3/2022 18:54 0.20 PROD1, DRILL TRIP P Continue in well, Clean pass through window 8,491.0 8,868.0 7/3/2022 18:54 7/3/2022 21:12 2.30 PROD1, DRILL DRLG P Drill, 1.85 BPM @ 4730 PSI FS, BHP=3744. High WOB with low diff pressure. Drag through window 8,868.0 9,009.0 7/3/2022 21:12 7/3/2022 21:24 0.20 PROD1, DRILL WPRT T PUH, Trouble shoot gamma tool. Sending up only zeros. Cycle power to BHA 21:30 start BHI NPT for DGS failure 9,009.0 8,930.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 7/12/2022 Page 4/10 1G-02 Report Printed: 7/14/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/3/2022 21:24 7/3/2022 23:24 2.00 PROD1, DRILL TRIP T Unable to resolve DH problem. POOH, PUW=36K 8,930.0 59.6 7/3/2022 23:24 7/4/2022 00:00 0.60 PROD1, DRILL PULD T At surface, Tag up space out. PUD BHA #5 Failed DGS 59.6 0.0 7/4/2022 00:00 7/4/2022 00:18 0.30 PROD1, DRILL PULD T Undeploy BHA #5 (cont) 0.0 0.0 7/4/2022 00:18 7/4/2022 01:00 0.70 PROD1, DRILL CTOP T Make up swizzle stick. Stab on injector jet stack. Unstab injector 0.0 0.0 7/4/2022 01:00 7/4/2022 02:06 1.10 PROD1, DRILL PULD T M/U PD BHA #6. Make up to coil and surface test. Tag up set counters 0.0 72.2 7/4/2022 02:06 7/4/2022 03:42 1.60 PROD1, DRILL TRIP T RIH, 300' close EDC shallow test tool, 1.55 BPM @ 3515 PSI FS, 510 PSI diff. Open EDC continue in hole 72.2 8,480.0 7/4/2022 03:42 7/4/2022 03:48 0.10 PROD1, DRILL DLOG T Log K1 for -12' correction, PUW=38K 8,480.0 8,507.0 7/4/2022 03:48 7/4/2022 03:48 PROD1, DRILL TRIP T Continue in well. Clean pass through window 8,507.0 8,965.0 7/4/2022 03:48 7/4/2022 03:54 0.10 PROD1, DRILL DLOG T Log RA marker in at 8947, TOWS=8940. TOW=8944, BOW=8948 8,965.0 8,990.0 7/4/2022 03:54 7/4/2022 04:00 0.10 PROD1, DRILL TRIP T Continue in hole 8,990.0 9,009.0 7/4/2022 04:00 7/4/2022 06:00 2.00 PROD1, DRILL DRLG P Drill, 1.83 BPM @ 4154 PSI FS, BHP=3873, IA=120, OQ=24 WHP=191 Off BHI NPT 4 Hrs today 9,009.0 9,184.0 7/4/2022 06:00 7/4/2022 08:00 2.00 PROD1, DRILL DRLG P OBD, 1.83 bpm/4,289 psi/Diff 766, WHP 96, BHP 3,828, IA 124, OA 26 PUW's 40k 9,184.0 9,238.0 7/4/2022 08:00 7/4/2022 10:00 2.00 PROD1, DRILL DRLG P OBD, 1.85 bpm/4,315 psi/Diff 769, WHP 119, BHP 3,844, IA 138, OA 30 PUW's 40k 9,238.0 9,275.0 7/4/2022 10:00 7/4/2022 12:00 2.00 PROD1, DRILL DRLG P OBD, 1.85 bpm/4,315 psi/Diff 769, WHP 119, BHP 3,844, IA 138, OA 30 9,275.0 9,275.0 7/4/2022 12:00 7/4/2022 14:00 2.00 PROD1, DRILL DRLG P OBD, 1.83 bpm/4,327 psi/Diff 773, WHP 129, BHP 3,847, IA 129, OA 33 9,275.0 9,300.0 7/4/2022 14:00 7/4/2022 16:00 2.00 PROD1, DRILL DRLG P OBD, 1.84 bpm/4,304 psi/Diff 766, WHP 113, BHP 3,836, IA 150, OA 34 9,300.0 9,410.0 7/4/2022 16:00 7/4/2022 16:36 0.60 PROD1, DRILL DRLG P OBD, 1.61 bpm/4,041 psi/Diff 849, WHP 127, BHP 3,845, IA 155, OA 36 9,410.0 9,510.0 7/4/2022 16:36 7/4/2022 17:12 0.60 PROD1, DRILL TRIP P POOH for lateral assembly 9,510.0 8,940.0 7/4/2022 17:12 7/4/2022 17:30 0.30 PROD1, DRILL TRIP P Above the window Perfrom jog in 7" Open EDC Continue OOH 8,940.0 8,872.0 7/4/2022 17:30 7/4/2022 19:00 1.50 PROD1, DRILL TRIP P Continue OOH 8,872.0 73.0 7/4/2022 19:00 7/4/2022 20:12 1.20 PROD1, DRILL BHAH P At surface, spaceout, PUD build assembly 73.0 0.0 7/4/2022 20:12 7/4/2022 21:30 1.30 PROD1, DRILL BHAH P PD Lateral assembly Check and change pac-offs Surrface est BHI CoilTrak tools Stab INJH 0.0 72.2 7/4/2022 21:30 7/4/2022 23:00 1.50 PROD1, DRILL TRIP P Tag up, re-set counters, RIH 500', test BHI mud motor Continue IH 72.2 8,470.0 7/4/2022 23:00 7/4/2022 23:12 0.20 PROD1, DRILL DLOG P Log formation for depth control correction of minus 12' PUW 34 k 8,470.0 8,520.0 7/4/2022 23:12 7/4/2022 23:30 0.30 PROD1, DRILL TRIP P Continue IH RIW 11 k 8,520.0 9,510.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 7/12/2022 Page 5/10 1G-02 Report Printed: 7/14/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/4/2022 23:30 7/5/2022 00:00 0.50 PROD1, DRILL DRLG P BOBD, 1.8 bpm/3,828 psi/Diff 544, WHP 133, BHP 4,126, IA 132, OA 31 9,510.0 9,552.0 7/5/2022 00:00 7/5/2022 03:42 3.70 PROD1, DRILL DRLG P Drill, 1.84 BPM @ 3815 PSI FS, BHP=3855 9,552.0 9,900.0 7/5/2022 03:42 7/5/2022 04:06 0.40 PROD1, DRILL WPRT P Drill, 1.84 BPM @ 3815 PSI FS, BHP=3855 9,900.0 9,900.0 7/5/2022 04:06 7/5/2022 05:42 1.60 PROD1, DRILL DRLG P Drill, 1.84 BPM @ 3815 PSI FS, BHP=3898 9,900.0 10,032.0 7/5/2022 05:42 7/5/2022 05:54 0.20 PROD1, DRILL WPRT P Pull BHA Wiper, PUW=48K 10,032.0 10,032.0 7/5/2022 05:54 7/5/2022 07:12 1.30 PROD1, DRILL DRLG P Drill, 1.82 BPM @ 3905 PSI FS, BHP=3895 10,032.0 10,118.0 7/5/2022 07:12 7/5/2022 12:48 5.60 PROD1, DRILL DRLG P Drill, 1.82 BPM @ 3770 PSI FS, BHP=3895. Drill on ankorite. Low ROP 10,118.0 10,300.0 7/5/2022 12:48 7/5/2022 14:36 1.80 PROD1, DRILL WPRT P Wiper trip #2. Going to window to investigate build section, PUW=46K. 9300' overpulls with pack off events. Unable to RBIH even after reducing pump rate, Pump sweeps and circ down. Continue to work pipe. Come up through at full tate ~ 7 FPM 10,300.0 9,050.0 7/5/2022 14:36 7/5/2022 15:00 0.40 PROD1, DRILL WPRT P 9050 jog down below window. pump sweeps, continue wiper to TT 9,050.0 8,925.0 7/5/2022 15:00 7/5/2022 15:42 0.70 PROD1, DRILL WPRT P Open EDC Jog TT then pull up to K1 tie in 8,925.0 8,470.0 7/5/2022 15:42 7/5/2022 15:48 0.10 PROD1, DRILL DLOG P Log K1 for +6' correction 8,470.0 8,488.0 7/5/2022 15:48 7/5/2022 17:12 1.40 PROD1, DRILL WPRT P Wiper back in hole, stop @ 8940' shut. EDC, continue in set down 9040. 9220, on way back in. Working pipe through build. 9276 to 9290 problematic with set downs 8,488.0 10,300.0 7/5/2022 17:12 7/5/2022 22:36 5.40 PROD1, DRILL DRLG P BOBD F/ 10300 T/ 10507' 1.82 4073 psi 704 diff Ann 3915 Faulted out of Zone @ 11320' Turn up to find structure @ 11450' 10,300.0 10,507.0 7/5/2022 22:36 7/6/2022 00:00 1.40 PROD1, DRILL TRIP P Pump 5X5 sweeps pooh for OHAB 10,507.0 8,950.0 7/6/2022 00:00 7/6/2022 02:00 2.00 PROD1, DRILL TRIP T Jet 7" w/ open EDC , POOH for OHAB 8,950.0 76.0 7/6/2022 02:00 7/6/2022 03:00 1.00 PROD1, DRILL PULD T Tag up space out 1.2' // PUD BHA# 7 Lateral assembly 76.0 0.0 7/6/2022 03:00 7/6/2022 04:00 1.00 PROD1, DRILL PULD T PD BHA# 8 OHAB 0.0 80.0 7/6/2022 04:00 7/6/2022 05:42 1.70 PROD1, DRILL TRIP T Tag up set counters // RIH w/ OHAB 80.0 8,470.0 7/6/2022 05:42 7/6/2022 05:54 0.20 PROD1, DRILL DLOG T Log K1 for -12' correction 8,470.0 8,515.0 7/6/2022 05:54 7/6/2022 06:12 0.30 PROD1, DRILL TRIP T Continue trip in, stop @ 8920 close EDC. PUW=38K Continue in 8,515.0 8,949.0 7/6/2022 06:12 7/6/2022 06:24 0.20 PROD1, DRILL TRIP T 8949 stack out 3 times. got through @ 130LOHS RIH 8,949.0 8,961.0 7/6/2022 06:24 7/6/2022 06:48 0.40 PROD1, DRILL TRIP T Stack out @ 8961. Work orienter - pipe Unable to work past 8,961.0 8,961.0 7/6/2022 06:48 7/6/2022 08:54 2.10 PROD1, DRILL TRIP T POOH for FCO, Stop @ 8920 open EDC. Fill hole across the top tripping out 8,961.0 56.0 7/6/2022 08:54 7/6/2022 10:00 1.10 PROD1, DRILL PULD T At surface, Tag up space out. PJSM, PUD BHA #8. All billet pieces on surface 56.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 7/12/2022 Page 6/10 1G-02 Report Printed: 7/14/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/6/2022 10:00 7/6/2022 11:12 1.20 PROD1, DRILL PULD T Reconfigure BHA for motor D331 FCO. PD BHA #9 FCO, Surface test tools, Tag up set counters 0.0 64.5 7/6/2022 11:12 7/6/2022 12:54 1.70 PROD1, DRILL TRIP T RIH BHA #9 64.5 8,470.0 7/6/2022 12:54 7/6/2022 13:06 0.20 PROD1, DRILL DLOG T Log K1 for -11.5 8,470.0 8,512.0 7/6/2022 13:06 7/6/2022 13:36 0.50 PROD1, DRILL TRIP T Continue in, stop and close EDC @8910 PUW=41K 8,512.0 8,947.0 7/6/2022 13:36 7/6/2022 15:36 2.00 PROD1, DRILL TRIP T Tag up at 1.5 BPM. PUH pumps up to 1.8 BPM @ 3835. Hard stall 8947. Try different tool faces HS, 20L, 20R. Work in @ 1 FPM, 5 fpm. .5 FPM always hard stall 8947'. Never made any footage 8,947.0 8,947.0 7/6/2022 15:36 7/6/2022 17:06 1.50 PROD1, DRILL TRIP T PUH Jet 7" and recip . POOH 8,947.0 80.0 7/6/2022 17:06 7/6/2022 18:24 1.30 PROD1, DRILL PULD T PUD BHA 80.0 0.0 7/6/2022 18:24 7/6/2022 19:24 1.00 PROD1, DRILL PULD T PD BHA# 10 Crayola mill w/ xtreme 1° 0.0 75.0 7/6/2022 19:24 7/6/2022 21:06 1.70 PROD1, DRILL TRIP T Tag up set depth RIH with clean out run bha // Tie in K1 for -11' correction // RIH T 8935' 75.0 8,935.0 7/6/2022 21:06 7/6/2022 21:36 0.50 PROD1, DRILL WASH T Close EDC // Wash F/ 8900' T/ 9050' 1.84 bpm 3669 pp 356 diff 30psi diff while washing through window 8,935.0 9,050.0 7/6/2022 21:36 7/6/2022 22:36 1.00 PROD1, DRILL REAM T Ream window 30°R 30°L 180°R // Dry Drift clean // Min rate T/ 9050' clean 9,050.0 9,050.0 7/6/2022 22:36 7/7/2022 00:00 1.40 PROD1, DRILL TRIP T POOH for OHAB 9,050.0 3,500.0 7/7/2022 00:00 7/7/2022 00:45 0.75 PROD1, DRILL TRIP T POOH for OHAB 3,500.0 76.0 7/7/2022 00:45 7/7/2022 01:30 0.75 PROD1, DRILL PULD T PUD BHA# 10 crayola assembly 76.0 0.0 7/7/2022 01:30 7/7/2022 02:30 1.00 PROD1, DRILL PULD T PD BHA # 11 OHAB 0.0 73.0 7/7/2022 02:30 7/7/2022 05:00 2.50 PROD1, DRILL TRIP T Tag up set counters // RIH w/ EDC open OHAB // Tie in -4' correction// RIH T/ 9037.04' bit depth ( TOB 9025') // Pump .4 bpm 2900 psi 1600 diff .7 DHWOB , sheared pushed to 9140' bad set 73.0 9,140.0 7/7/2022 05:00 7/7/2022 06:48 1.80 PROD1, DRILL TRIP T POOH for second billet 9,140.0 67.0 7/7/2022 06:48 7/7/2022 08:00 1.20 PROD1, DRILL PULD T PJSM, PUD BHA #11. Billet setting tools 67.0 0.0 7/7/2022 08:00 7/7/2022 08:18 0.30 PROD1, DRILL BHAH T Make up Open hole anchor billet 0.0 0.0 7/7/2022 08:18 7/7/2022 10:00 1.70 PROD1, DRILL PULD T Pressure deploy BHA #12 Anchor billit. Make up to coil and surface test. Tag up set countgers 0.0 73.2 7/7/2022 10:00 7/7/2022 11:54 1.90 PROD1, DRILL TRIP T RIH BHA #12 73.2 8,480.0 7/7/2022 11:54 7/7/2022 12:00 0.10 PROD1, DRILL DLOG T Log K1 for -6.5' correction 8,480.0 8,511.0 7/7/2022 12:00 7/7/2022 12:24 0.40 PROD1, DRILL TRIP T Continue in. Close EDC @ 8920, PUW=45K. Clean pass through window clear down to set depth A 9042. 8,511.0 9,042.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 7/12/2022 Page 7/10 1G-02 Report Printed: 7/14/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/7/2022 12:24 7/7/2022 12:36 0.20 PROD1, DRILL CTOP T At set depth. Orient to 30ROHS. Bring pumps online. See tool shift @ 3400 PSI. No DHWOB change 9,042.0 9,042.0 7/7/2022 12:36 7/7/2022 14:54 2.30 PROD1, DRILL TRIP T Attempt to set down weight on anchor billet. Billet moving down hole. Tag up with first billet @ 9127 push both billets down hole to see where they will stop moving down. Run out of push @ 10,190. TOB=10178' 9,042.0 10,178.0 7/7/2022 14:54 7/7/2022 16:30 1.60 COMPZ1, CASING CIRC P Out of push. Formulate plan forward. Mix beaded liner running pill in 8.6 PPG mud. circ downhole 10,178.0 10,178.0 7/7/2022 16:30 7/7/2022 17:00 0.50 COMPZ1, CASING TRIP P Get one BBl LRP out. Start out of hole, PUW=52K 10,178.0 8,934.0 7/7/2022 17:00 7/7/2022 17:45 0.75 COMPZ1, CASING PRTS P Stop, Perform BHSP test, Initial pressure, Annular=3831, TVD @ sensor 6124' 8,934.0 8,934.0 7/7/2022 17:45 7/7/2022 19:00 1.25 COMPZ1, CASING CIRC P Pump KWF to bit 11.9 8,934.0 8,934.0 7/7/2022 19:00 7/7/2022 20:30 1.50 COMPZ1, CASING DISP P POOH swapping well to KWF 8,934.0 75.0 7/7/2022 20:30 7/7/2022 21:00 0.50 COMPZ1, CASING CTOP P 30 min flow check, no flow, PJSM lay down on dead well 75.0 75.0 7/7/2022 21:00 7/7/2022 21:30 0.50 COMPZ1, CASING PULD P Lay down BHA# 12 on dead well 75.0 0.0 7/7/2022 21:30 7/7/2022 22:30 1.00 COMPZ1, CASING RURD P Rig up to run liner 0.0 0.0 7/7/2022 22:30 7/8/2022 00:00 1.50 COMPZ1, CASING PUTB P Pick up and run : 1- Non-Ported Baker Bullnose 37- 2-3/8" slotted ST- L 4.6# jts liner 1- Liner top billet Baker 0.0 1,700.0 7/8/2022 00:00 7/8/2022 00:18 0.30 COMPZ1, CASING RURD P Rig Down Liner Running Equipment 1,700.0 1,700.0 7/8/2022 00:18 7/8/2022 00:48 0.50 COMPZ1, CASING PULD P Pick up BOT liner top billet w/ gs , pick up baker inteq bha, stab cart on well 1,700.0 1,750.0 7/8/2022 00:48 7/8/2022 04:06 3.30 COMPZ1, CASING RUNL P RIH with liner // Tiie into window flag for -10' correction // correct to HRZ for +5' correction // Pu wt 41K at window Stack out 9265' pump worked past, 9730' stack work pipe 1,750.0 9,735.0 7/8/2022 04:06 7/8/2022 06:00 1.90 COMPZ1, CASING RUNL P Tight spot @ 9735 Work pipe work pipe down to 10,180' in compression. Neutral weight estimate 10,172 9,735.0 10,180.0 7/8/2022 06:00 7/8/2022 08:00 2.00 COMPZ1, CASING TRIP P Bring pumps on 1.5 BPM @ 2450 PSI, PUW=36K. Liner released, PUH. above window. Remove liner length left in hole. POOH 10,180.0 65.0 7/8/2022 08:00 7/8/2022 09:24 1.40 COMPZ1, CASING PULD P At surface, PJSM to lay down BHA on dead well. Perform 30 minute flow check. Lay down BHA #13 liner running tools 65.0 0.0 7/8/2022 09:24 7/8/2022 09:42 0.30 COMPZ1, CASING BOPE P Function test BOPE - Good 0.0 0.0 7/8/2022 09:42 7/8/2022 11:24 1.70 PROD2, DRILL PULD P M/U BHA #14. Kick off drill high angle turn. Make up to coil and surface test. Reboot Advantage Machine. Tag up - set counters 0.0 72.2 7/8/2022 11:24 7/8/2022 13:30 2.10 PROD2, DRILL TRIP P RIH BHA #14, Shallow test @ 515 feet. 1.86 BPM @ 4760 PSI FS, 830 PSI Diff, continue in well 72.2 8,470.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 7/12/2022 Page 8/10 1G-02 Report Printed: 7/14/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/8/2022 13:30 7/8/2022 13:36 0.10 PROD2, DRILL DLOG P Log K1 for -5' correction 8,470.0 8,498.1 7/8/2022 13:36 7/8/2022 13:42 0.10 PROD2, DRILL TRIP P Continue in well 8,498.1 8,929.0 7/8/2022 13:42 7/8/2022 14:54 1.20 PROD2, DRILL CIRC P Displace 11.9 PPG NaBr out of well with PwrPro SYS #1, Close EDC 8,929.0 8,929.0 7/8/2022 14:54 7/8/2022 15:06 0.20 PROD2, DRILL TRIP P Trip in well, Clean pass through window, Dry tag liner top billet @ 9029', PUH 8,929.0 8,915.0 7/8/2022 15:06 7/8/2022 16:42 1.60 PROD2, DRILL MILL P Bring pumps online 1.83 BPM @ 4046 PSI FS, BHP=3838. Stall on first attemp to get milling, P/U and restartStart milling @ 9028.77 8,915.0 9,028.8 7/8/2022 16:42 7/8/2022 18:12 1.50 PROD2, DRILL KOST P Mill off billet per proceedure 9,028.8 9,032.0 7/8/2022 18:12 7/8/2022 21:48 3.60 PROD2, DRILL DRLG P Drill Ahead F/ 9032 T/ 9380 Drill 50' dry drift billet // drift clean 1.82 bpm 4300psi 835diff 3826ann 9,032.0 9,380.0 7/8/2022 21:48 7/9/2022 00:00 2.20 PROD2, DRILL TRIP P Pick up 45K, pump sweeps, POOH for lateral bha // Jet 7" Tubing // 9,380.0 1,500.0 7/9/2022 00:00 7/9/2022 00:30 0.50 PROD2, DRILL TRIP P POOH tag up as surface, space out 1.2' 1,500.0 74.0 7/9/2022 00:30 7/9/2022 01:42 1.20 PROD2, DRILL PULD P PJSM// PUD BHA# 14 build assembly BHA unable to move in pdl when un- deploying, pump across top, pump down through edc and spin bit, no movement, decision made to make up injector and orient 74.0 74.0 7/9/2022 01:42 7/9/2022 02:27 0.75 PROD2, DRILL PULD T Start pressure deploy checklist to get cart back on well to orient tools and/or run tools back into well // Orient tools no over amp// close edc and RIH 250' // POOH tag up space out .9' 74.0 74.0 7/9/2022 02:27 7/9/2022 03:27 1.00 PROD2, DRILL PULD P PUD BHA# 14 // lay down xtreme motor and bit Bit out 1-3-BT-G-X-0-PN-BHA 74.0 0.0 7/9/2022 03:27 7/9/2022 04:42 1.25 PROD2, DRILL PULD P Pick up and deploy BHA# 15 .6° AKO Xtreme motor w/ Hyc A3 bit 0.0 75.0 7/9/2022 04:42 7/9/2022 06:12 1.50 PROD2, DRILL TRIP P RIH w/ BHA# 15 75.0 8,480.0 7/9/2022 06:12 7/9/2022 06:18 0.10 PROD2, DRILL DLOG P Log K1 for -5' correction, PUW=40K 8,480.0 8,497.0 7/9/2022 06:18 7/9/2022 07:12 0.90 PROD2, DRILL TRIP P Continue in well, Clean pass through window to stack out @ 9350. PUH to 9320. Reduce pump rate to 1 BPM RIH to 9380. Bring pump up to 1.8 BPM @ 4180 PSI. Back ream uphole to 9330, Trip back to bottom 8,497.0 9,380.0 7/9/2022 07:12 7/9/2022 11:06 3.90 PROD2, DRILL DRLG P Drill, 1.83 BPM @ 4189 PSI FS, BHP=3939, 9,380.0 9,780.0 7/9/2022 11:06 7/9/2022 11:36 0.50 PROD2, DRILL WPRT P Wiper trip #1, PUW=44K. Clean up and down 9,780.0 9,780.0 7/9/2022 11:36 7/9/2022 14:42 3.10 PROD2, DRILL DRLG P Drill, 1.87 BPM @ 4236PSI FS, BHP=3885 9,780.0 10,180.0 7/9/2022 14:42 7/9/2022 15:06 0.40 PROD2, DRILL WPRT P Wiper trip #2 800' PUW=44K, RIW=10K 10,180.0 10,180.0 7/9/2022 15:06 7/9/2022 20:42 5.60 PROD2, DRILL DRLG P Drill, 1.84 BPM @ 4309PSI FS, BHP=3829 New mud @ Bit 10613' @ 20:32 10,180.0 10,615.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 7/12/2022 Page 9/10 1G-02 Report Printed: 7/14/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/9/2022 20:42 7/9/2022 22:00 1.30 PROD2, DRILL WPRT P Wiper to window for tie in 45K pu wt Tie in RA tag for +5.5' correction Pull into 7" and jet tubing 10,615.0 8,900.0 7/9/2022 22:00 7/9/2022 23:24 1.40 PROD2, DRILL TRIP P Trip to bottom 8,900.0 10,615.0 7/9/2022 23:24 7/10/2022 00:00 0.60 PROD2, DRILL DRLG P OBD F/ 10615' T/ 10618 1.8 bpm 3700psi 657diff 10,615.0 10,618.0 7/10/2022 00:00 7/10/2022 05:06 5.10 PROD2, DRILL DRLG P OBD F/ 10618' T/ 10,802 1.8 bpm 3700psi 657diff 10,618.0 10,859.0 7/10/2022 05:06 7/10/2022 05:12 0.10 PROD2, DRILL WPRT P 10859', Pull 400' wiper, PUW=46K 10,859.0 10,765.0 7/10/2022 05:12 7/10/2022 05:54 0.70 PROD2, DRILL WPRT P Overpull and packing off, Unable to RIH. Work pipe, 65K to -2K. DHWOB not responding to tension of compression. Struggle to POOH until 10,727. Poor hole conditions 10,765.0 10,727.0 7/10/2022 05:54 7/10/2022 07:12 1.30 PROD2, DRILL WPRT P Smoothed out. Pull wiper to jet 7" 10,727.0 8,890.0 7/10/2022 07:12 7/10/2022 08:12 1.00 PROD2, DRILL WPRT P Jet 7" with sweeps while town is formulating plan forward 8,890.0 8,937.0 7/10/2022 08:12 7/10/2022 08:24 0.20 PROD2, DRILL WPRT P Call TD, RBIH, Stack out in window. PUH, roll pump shut down pump RIH through window 8,937.0 9,010.0 7/10/2022 08:24 7/10/2022 08:30 0.10 PROD2, DRILL WPRT P Hanging up in Build Billet area. PUH to tie into RA marker 9,010.0 8,950.0 7/10/2022 08:30 7/10/2022 08:36 0.10 PROD2, DRILL DLOG P Log RA for +7.5' 8,950.0 8,975.1 7/10/2022 08:36 7/10/2022 10:12 1.60 PROD2, DRILL WPRT P Continue wiper to bottom. Build turn section tight. Stacking in build no set downs, stacking @ 10,225, 10,395, 10423, 10637, 10683 8,975.1 10,707.0 7/10/2022 10:12 7/10/2022 12:54 2.70 PROD2, DRILL WPRT P Poor hole conditions. Plan to run liner to 10725'. Start swab wiper from here. Hole choppy with overpulls coming off bottom 10,707.0 72.0 7/10/2022 12:54 7/10/2022 14:30 1.60 PROD2, DRILL WPRT P Tag up, set counters, RBIH 72.0 8,480.0 7/10/2022 14:30 7/10/2022 14:36 0.10 PROD2, DRILL DLOG P Log K1 for -9' correction 8,480.0 8,492.2 7/10/2022 14:36 7/10/2022 14:48 0.20 PROD2, DRILL WPRT P Continue in well 8,492.2 8,931.0 7/10/2022 14:48 7/10/2022 15:06 0.30 PROD2, DRILL PRTS P Obtain SBHP @ 6025' SSTVD, Annular =3505 8,931.0 8,931.0 7/10/2022 15:06 7/10/2022 15:12 0.10 PROD2, DRILL WPRT P Continue in well, Clean through window. Stacking in build no set downs. Continue in. Load 25 BBls beaded pill in ct 8,931.0 10,708.0 7/10/2022 15:12 7/10/2022 16:48 1.60 PROD2, DRILL WPRT P Set down, Pull off bottom beads coming out, PUW-52K 10,708.0 10,708.0 7/10/2022 16:48 7/10/2022 19:18 2.50 PROD2, DRILL DISP P Lay in LRP to windown and 11.8+ KWF to surface 10,708.0 50.0 7/10/2022 19:18 7/10/2022 20:24 1.10 PROD2, DRILL PULD P Stop @ 50' flow check well // No Flow // Lay down lateral BHA // Bit Out 1-3-BT-G-X-I-WT-TD 50.0 0.0 7/10/2022 20:24 7/10/2022 20:39 0.25 COMPZ2, CASING RURD P Rig up to run liner 0.0 0.0 7/10/2022 20:39 7/10/2022 21:39 1.00 COMPZ2, CASING PUTB P Pick up = 1 - Non-ported Bull Nose 23 - Jtst 2-3/8" slotted ST-L 4.6# liner 1- QCLL Total footage = 709.44' 0.0 705.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 7/12/2022 OBD F/ 10618' T/ 10,802 10,859.0 10859', Page 10/10 1G-02 Report Printed: 7/14/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 7/10/2022 21:39 7/10/2022 22:15 0.60 COMPZ2, CASING PULD P Pick up Baker BHA # 16 705.0 754.0 7/10/2022 22:15 7/11/2022 00:00 1.75 COMPZ2, CASING RUNL P Tag up set depth // RIH w/ BHA# 16 // Tie in formation -7.5' correction 754.0 10,725.0 7/11/2022 00:00 7/11/2022 01:00 1.00 COMPZ2, CASING RUNL P Run liner T/ 10745' // PU Wt. 49K // Pump off GS profile of QCLL PU Wt. 36K liner off 10,745.0 10,745.0 7/11/2022 01:00 7/11/2022 01:48 0.80 COMPZ2, CASING CIRC P Pump LRP to bit 10,745.0 100,045.0 7/11/2022 01:48 7/11/2022 03:48 2.00 COMPZ2, CASING TRIP P Lay in new LRP pooh for upper liner section 10,045.0 45.0 7/11/2022 03:48 7/11/2022 04:24 0.60 COMPZ2, CASING PULD P Stop @ 40' , flow check well well dead//lay down BHA# 16 liner running assembly 45.0 0.0 7/11/2022 04:24 7/11/2022 04:36 0.20 COMPZ2, CASING RURD P Rig up to run liner 0.0 0.0 7/11/2022 04:36 7/11/2022 07:12 2.60 COMPZ2, CASING PUTB P M/U L1-01 upper liner segment with dissolvable bullnosem , 34 jts slotted liner, swell packer, 4 jts blank liner, and 4' deployment sleeve. Make up coil to coil trak and surface test 0.0 1,235.3 7/11/2022 07:12 7/11/2022 08:12 1.00 COMPZ2, CASING PULD T Coiltrak failed surface test. Bore pressure reading 21,176 PSI. Pull coiltrak, Replace DPS. Make up to liner and. Surface test good 1 Hr BHI NPT 1,235.3 1,235.3 7/11/2022 08:12 7/11/2022 10:18 2.10 COMPZ2, CASING TRIP P Tag up set counters, RIH. 1,235.3 8,835.0 7/11/2022 10:18 7/11/2022 10:24 0.10 COMPZ2, CASING DLOG P Tie into EOP window flag for -8.6' correction 8,835.0 8,835.0 7/11/2022 10:24 7/11/2022 10:48 0.40 COMPZ2, CASING TRIP P Continue in hole. Clean through window, Tie into formation for +2' correction. First tight spot 9043. Work liner to 10035 8,835.0 10,035.0 7/11/2022 10:48 7/11/2022 11:30 0.70 COMPZ2, CASING TRIP P Set down on lower liner, PUW=61K. Latched up. Bring pumps online, PUW=48 K off liner. PUH 10' stop. Renove liner length left in hole from counters Tighten tree bolts. Obtain SBHP of 3793 10,035.0 8,754.0 7/11/2022 11:30 7/11/2022 12:24 0.90 DEMOB, WHDBOP CIRC P Start circulating seawater down CT 8,754.0 8,754.0 7/11/2022 12:24 7/11/2022 14:30 2.10 DEMOB, WHDBOP TRIP P POOH, Freeze protect from 2500' to surface 8,754.0 38.0 7/11/2022 14:30 7/11/2022 15:30 1.00 DEMOB, WHDBOP PULD P Tag up space out, PJSM, PUD BHA #17, Lay down tools 38.0 0.0 7/11/2022 15:30 7/11/2022 17:00 1.50 DEMOB, WHDBOP RURD P M/U swizzle stick, stab injector back on well, Jet stack flush rig, Unstab injector. Lay down swizzle stick Rack back injector and chain down. 0.0 0.0 7/11/2022 17:00 7/12/2022 00:00 7.00 DEMOB, WHDBOP Continue Rig down, Chain storage reel, F/P tree, R/D cellar, R/D Putz. Off load Pits, R/D TT line. Work Rig down check list 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 7/12/2022 Set down on lower liner, PUW=61K. Latched up. M/U L1-01 upper liner segment withpp g dissolvable bullnosem , 34 jts slotted,j liner, swell packer, 4 jts blank liner, and,p,j 4' deployment sleeve. Run liner T/ 10745'                                  !                        " #$ %   &     $                    '  # '         " () * % & + %)) , #)   + *   " (##) * %  &-) &  # " $$) . $#) * %   ) " $$') . $') * %     &+   &   .  %    &   / ' " $') * + &+  % #           - -  -      - -  - -    % #$         +                     &      $()        & $()  $')% & + + +  &  -           $(%)  0 '$$  $)  0 '$''%   $         + * +    " (#) *    " $$')%  +  % & -  #%  0 #'  %  0 # %   %  #          & %    &  #%$     &+ #     +  * &+ (  &    %    &    $$')  $% & /    '   !  %       1 )% &        !  %      +  !!%     !  %  +    $/''% & &  !      !  %  +      $')       &% +    '       % (           $/)%    $$#) * %       %    &%     %   #$  %(  " ' % +     &    +   - %  ('        +     $)  ) & -  ' " %   #$ " %(    #  & #$         !     $$)   2222    2222 $ /       & +*        ! +    - &     '/  #   #  " '#  $$    #  2222    2222 #   344567 89 :;65<=8>? #/          +    " $() %    & % # % #   $ %  +  $$)       &   %    +  $() *   +    %    #             $$/)     %$@  & % & +*  %   + *    $(#) ()  +  ##     %@   + * +  ()  &    ')  &      % #( '              -    +   %    () %  0 '/%   #'%#  &%     $$) %  0 '/(%$   0 #%(  &%      /     & ()  $/)   & %   % ' '   * 8><=>3; 6=A B8C> DE;DF G=?< H;6 E53G E8F;  ;I3=GB - 986 <6;;% 6;:G5D; # 4: I6;5F;6 ?3I ?=B; -&% 8H; # #' <8 #  :8< 48B3G;? # #   *   =::G; 3:   <;?<% ;69864   <;?< % ;?< C=<>;??;B I7 6=5> =,I7 % 6=4  986 9G5< ?:8<%   J#% % 6=: => C;GG <8 (( 4=B>=AE< B;:<E222 =A 8> =AEG=>; " $54  #   * ;<  + CE=:?<8DF " $(/ % 6=: 986 C=>B8C 4=GG=>A  J%  =GG=>A :=>DE :8=>< " $(/%(% =GG <8 $(/$% 6=;><;6 95=G36;% 6=: 986 6;:G5D;4;>< ' #   * 84:G;<; <6=: 83< 89 C;GG 986 =665<=D 86=;><;6%   J'%   J/ C=<E B=99;6;>< 86=;><;6% 6=: =>% 84:G;<6; 65<E8G;% ;54  B6=9< C=>B8C :;6 :68D;B36;% 6=: 986 I3=GB ?;D<=8>  J%  B6=GG I3=GB ?;D<=8> $($ <8 (( CE;6; A5445 <88G ?<8::;B ?;>B=>A % >5IG; <8 A;< =< C86F=>A  / #   *  95=G;B    6;:G5D;4;>< <88G?  B6=GG;B I3=GB ?;D<=8> (() <8 (#)  986 G5<;65G 5??;4IG7   J  # 5<;65G 6=GG=>A ??;4IG7  J  ?C5: 43B " (#) 6=GG;B 5E;5B 9684 (#) <8 (  #   * 8><=>3;B <8 B6=GG 5E;5B " #') 953G<;B 83< 89 K8>; =><8  36>;B 3: " #/) <8 G8D5<; ?<63D<36;  # " #) :34:;B ?C;;:? 5>B  986   #   *  C   ?<5DF;B 83< => C=>B8C 43G<=:G; 86=;><5<=8>? D83GB >8< :5?? :88E 986 DG;5> 83< 5??;4IG7 ''# D83GB >8< :5?? <E683AE C=>B8C 43G<=:G; ?<5GG? " $(/) :88E 986 DG;5> 83< 5??;4IG7J  D6578G5 4=GG  :34:? 8> " $(') C5?E B8C> () ' :?= 48<86 C86F 5< C=>B8C B6;?? C=>B8C ' ' #$ B6=9< <8 () DG;5> L;< @ 5>B  986   #   * =DF 3: 5>B 63>  J# 5<<;4:< ?;< " (   A88B :6;??36; ?;< :3?E;B <8 (#/) I5B ?;< :88E 986  J  5<<;4:< ?;< " (') A88B :6;??36; ?;< :3?E;B I8<E I=GG;<?  ##$) I5B ?;< :88E 5>B :=DF 3: ' L<? ?G8<<;B G=>;6 986 G=>;6 <8: I=GG;< $ #   * 3> G=>;6 <8 ?;< B;:<E ##$)  :34: 899 :88E 986 I3=GB 5??;4IG7 <5A <8I " (') 4=GG 899 (M 5>B B6=GG I3=GB  ('$) :88E 986 G5< 5??;4IG7 ( #   * 8><=>3;B 83< 89 <E; E8G;  J #/ I3=GB 5??;4IG7 J    J # G5<;65G 5??;4IG7  <=; => *# 986 ) D866;D<=8> G;5> :5?? <E683AE C=>B8C% 6=GG;B 5E;5B  ##$) :3GG=>A C=:;6? ;H;67 /) C=:;6 <8 C=>B8C 986 <=; => N%) D866;D<=8> B6=GG 5E;5B  ##$ # #   * 6=GG 5E;5B  #$()  :=DF;B 3: 986 C=:;6 I;D54; <;4:% B;<5=>;B% C86F;B :=:; 96;; 5>B D8><=>3;B 83< <8 C=>B8C <8 L;< @  D5GG;B   <8 D8>9=64  45B; =< <8 #) :88E 986 ?C5I C=:;6   <=; => 986 () D866;D<=8>  5>B G57 I;5B? 9684 #$ <8 C=>B8C FC9 ##%$N <8 ?3695D; :88E 5>B 9G8C DE;DF C;GG G57 B8C> IE5 6=A 3: <8 63> G=>;6 :=DF 3: ' L<? ?G8<<;B G=>;6 5>B 65> => E8G; C=<E G8C;6 # D84:G;<=8> ## #   * 3> # # G8C;6 G=>;6 ?;D<=8> <8 #/ 0#'% 6=: 83<   J# 3::;6 G=>;6 ?;A4;><%  G5>B " #'%  $$//)% =?:G5D; C;GG <8 ?;5C5<;6% & 9684 ) C=<E  G? B=;?;G% &G3?E ?<5DF 5>B 6=A% =::G; B8C> ?<5DF  =A ;G;5?; # ::: D83GB >8< :5?? <E683AE C=>B8C 43G<=:G; ?<5GG? " $(/) Liner run for 1G-02L1-01 lateral. -WCB 6=GG 5E;5B  #$()  3> G=>;6 <8 ?;< B;:<E ##$)  :34:899 :88E 986 I3=GB 5??;4IG7 : ?36; ?;< :3?E;B I8<E I=GG;<?  ##$) I5B ?;< :88E 5>B :=DF 3: ' L<? ?G8<<;B G=>;6 986 G=>;6 <8: I=GG;< Here they drilled 1G-02L1 lateral - WCB 8><=>3;B <8 B6=GG 5E;5B " #') 953G<;B 83< 89 K8>; =><8  36>;B 3: " #/) " <8 G8D5<; ?<63D<36;  # " #) ;<  + CE=:?<8DF " $(/ Here they ran the liner for the 1G-02L1 lateral. -WCB C=>B8C% 6=GG;B 5E;5B  ##$) :3GG=>A C=:;6? ;H;67 /) 1G-02L1-01 lateral drilled. -WCB #$        &    " $$//)* + %     " $$//) * '//#   >&    " $$//)* %    * +      " $$//)*      & 2 2 #(         +    * " $$'() * & /   &  O  ' #@ * '     &   &  O  ' #@  &   " $$'() * .    O  #%$@ 1   " $$/) * .  %@   " $$'() *    +  %  %  '        %@  *     + #%$@ 1       " $$'() *   " $$//) "      %  #%$@ 1   .    " $$/) * %   %               !"  "#$ "#%&" 50-029-20813-60 ' ( ) ( &%$    ( *+    (  (          , -       . ( . / (    0 $(!  " "   #$% &' (  / (()*+   0    (#$% &'    ( ,++ )  0   )( #  )( '  0 1 (   ) )(+$-&(./ +  ' $-&00'     1 2++ 1  + 34 ! +  5,++ /   55 / /+/ .  .   &$ ( &$ ( 2 ( (  324%. 34%       #$&  (    % % *1$617*-%6 *417%$- %.  $2 ( % -89:6%$-$ 4$8496%4*, . /  567 8 $  5*7 )      567   0$ ) 0  ;! -<< *% 6%- *-1-%*7  (+  ( $ (   % ) +  ( 8)5*+ 7 5 7 34% 5 7   567 324%. 5 7 * 9 (61$% *%%%$% 8) 5 7  )  *)  5. / 7 * 5 7  6<4<   =>(! =  " + 2% 61$% &'<6<?? !,0, 0,!, 61$4% 1*-%  & '-<7<?? 0 5 7 : 567 ; 567 324%. 5 7 34% 5 7   *+ 5 7 *+  5 7 0   5 7 0  2  5 7 +    5 7 & 564"<7  *) 61$% *:%6 4%7- 71%* 416*% :1::*%471:%* *1$-716:*%4 *:71-*:%74 %77 *1-74%* !,0,&' * %%  )"#% 61$4% *:%- 4%-: 714*%-$ 416%$ :1:7:%*471**%-$ *1$-716$%47 *:71-*%*$ %6 *1-$%-: !,0,&' 9%*  .  61$7$%$4 *$%4- 4%4$ 717%- 416:%$6 :1:6*%471-%- *1$-716-%6 *:71-:%-6 $%: *16%$ !,0,&' :   $;) $1%4 -%:7 4%4 71-*%7 4164*%$6 :14$%-716*%7 *1$-71-$4%4 *:717-$%*- :*%6 *16:%$* !,0,&' :   $;) $17%*$ -$%$ 4%7* 716% 416*-%76 :14:%671$% *1$-71-6%:: *:717*-%7 :4%* *16*:% !,0,&' $17%6 66%76 4%66 716*%*$ 416-:%* :147%-71$*%*$ *1$-71-77%:* *:717-%7 -%*: *166%- !,0,&' $1$7%: $4%- **%- 7164%76 41667%4 :14$4%$471$4%76 *1$-71-*:%6 *:71*$4%*7 4%6 *1$*%7 !,0,&' $1:%6 $% 7$%6 716%$* 416$%:- :1*:%:71$%$* *1$-71-46% *:71**6%4 :$% *1$*%4 !,0,&' $17%:$ 6$%*4 6%4* 716%-$ 4166$%7 :1**6%*671$%-$ *1$-71-*%6 *:71*:%$4 4%4 *1$:4%$ !,0,&'    ' ( ) ( &%$    ( *+    (  (          , -       . ( . / (    0 $(!  " "   #$% &' (  / (()*+   0    (#$% &'    ( ,++ )  0 5 7 : 567 ; 567 324%. 5 7 34% 5 7   *+ 5 7 *+  5 7 0   5 7 0  2  5 7 +    5 7 & 564"<7  *) $1$%6 67%6 $%*$ 716:%-4 4166%6* :1*6-%*71$:%-4 *1$-71-*6%:: *:71*%:: :6%46 *1$:$%** !,0,&' $1%6 64%: ::%:- 7167%:: 4167*%66 :17*%$*71$7%:: *1$-71--:%4 *:714-:%47 :7%$ *1$:6%* !,0,&' $1*%$ 6*%$ :4%7 7166%- 41646%76 :17:-%$71$6%- *1$-71-$%: *:714*% 4%6 *1$:%*4 !,0,&' $16%* 6:%* :7%7 71$%* 416*%7- :17*7%$71%* *1$-716:%4 *:714::% 4%7 *1$6%7- !,0,&' $1:%: 6%- ::6%* 71$*%4$ 41-$$%:4 :177$%$71*%4$ *1$-716:$%:$ *:714$%* :6%4$ *1$%7* !,0,&' $1:4%*6 -$%- :46%7 71%7- 41-7$%67 :17-6%6471%7- *1$-71676%6 *:714%7 :%*- *16--%- !,0,&' $1:-%7$ -$%7 :*$%$ 717%$ 41-4%47 :176%717%$ *1$-716$6%$ *:7147%74 :*%:6 *16*%44 !,0,&' $14%* 64%6 6%: 71%- 41-%4- :176%671%- *1$-71$-%$ *:7146%: :4%$$ *16*%4 !,0,&' $14:%- 6$%$4 -%6* 71%47 4176% :17-:%*:71%47 *1$-71$*7%7 *:7144%$ :7%7 *1-$*%$ !,0,&' $147%:- 66%6 $%6 71%6 417*:%- :177%$$71%6 *1$-71$6*%7 *:714-%$ :6%77 *1-74%6$ !,0,&' $14$*%67 67%:- 4%47 71:% 4177%*7 :174%*:71:% *1$--1%: *:71447%7 :*%4- *1-:%7 !,0,&' $1**% 67%: 4-%7 71*%$ 417*%-7 :17%771*%$ *1$--1::% *:71477%$* % *1-4%*- !,0,&' $1**7%46 66%$ 4$%-7 717%*$ 41*6*%6 :1*$-%*:717%7 *1$--1*4% *:714$%:- $%- *17-*%66 !,0,&' $1*67% 66% *%67 71-%* 41*77%:6 :1*-4%*671-%* *1$--1-%64 *:71*:% -%$ *174$%: !,0,&' $17*%* 6$%* *-%* 716% 41*4$%:6 :1**%*$716% *1$--16$%$7 *:71*:-% $%-: *17:%76 !,0,&' $17*:%7 6$% *$%6 716%*7 41*$%:$ :1*6%7716%*- *1$--1% *:71*7$%4: 4%46 *1*$%67 !,0,&' $176%$ 6$%*4 *6% 716%6$ 41*4%$- :14$4%**716%6$ *1$--14%77 *:71*$%$- 4%*4 *1*76%6 !,0,&' $1-%*7 6$% **%- 71$%7 414$6%$- :14-%471$%7 *1$--14%-$ *:717-%:6 -%$$ *1*4:%$7 !,0,&' $1-4%- 66%6 *%7 71$%64 4146%7 :144*%:71$%64 *1$--1*6%64 *:7174%$ % *1*-%: !,0,&' $1--%*$ 66%: 4$% 71%77 4147%4$ :14%4:71:%77 *1$--1--%* *:71774%-$ %6 *14$%-- !,0,&' $16%-* 6-%*- 47%*- 71%6 4144%7 :14%71:%6 *1$--1$-%6- *:7176-% 6%* *147:% !,0,&' $16:%* 6-% 4:%$$ 71:%: 414%6: :1:-6%4*71::%: *1$--1$%4 *:71-6%** 6%*6 *14:4%4 !,0,&' $167%$7 66%:- 4%66 714%4 41:$6%$ :1:*6%471:4%4 *1$--14%4: *:71-6%47 %$ *147% !,0,&' $16$%$: $%:* 4%* 714%4- 41:-7% :1::6%$-71:4%4- *1$--174%:: *:71-4-%-6 %: *1:--% !,0,&' $1$%:: $%7 :-%$4 71:%*- 41:*%* :1:$%6*71::%*- *1$--166%* *:71-77%-- -%: *1:4-%-4 !,0,&' $1$*%*- $4%*6 :7%74 71%66 41:$%$ :1:%-71:%66 *1$--1:%:7 *:71-64%:: $%7$ *1:$% !,0,&' $1$64%6 $*%:- ::%4 716%$ 41:%: :16%7:716%$ *1$--1::$%4: *:716:%- %* *16*%7 !,0,&' 1%6: $*%7 :%$* 717%* 41-$%:6 :176%6-717%* *1$--1:7%44 *:716-%:7 6%6 *1*$%$ !,0,&' 14%* $7%* $%- 71:%*$ 41*:%6 :1*4%$71:%*$ *1$--1:6-% *:716:% -%: *1:%4$ !,0,&' 17%:* $*%-6 -% 71%*: 41:7%:$ :144%671%*: *1$--144%** *:7164%- %* *1%-$ !,0,&' 16$%** $*%$ 4%4 716%** 41%6 :1:%:716%** *1$--14:%6 *:716*:%** %: *16%-* !,0,&' 1:%6 $4%** %4* 71*%4$ 41-$%:$ :1$%471*%4$ *1$--147%76 *:71677%$ 6%- *146%:$ !,0,&' 1*%** $%7$ $%- 714% 41*:%- :1$%-7714% *1$--146-%4 *:716-*%-$ %6 *1%* !,0,&' 16%$: 66% *%-7 714%7 414%-$ :1%*714%7 *1$--1*7%:6 *:71664%6$ -%*- *1$%$ !,0,&' 1%7$ 6-%- %$- 71*%7 41$*%$$ :1$:%:71*%7 *1$--1*4*% *:716$% $%-- *17%- !,0,&' 14-%4 66%:- $%: 717%7* 417%* :167%717%7* *1$--1*6%6 *:716$6%$4 %77 *17%* !,0,&' 1-%: 6$%6 $%* 71-%: 41:7%*6 :16%71-%: *1$--174%7- *:71$%- 7%6 *1:%* !,0,&' 1:%6 $%* -%64 71-%: 41-%-- :1--%671-%: *1$--17::%* *:71$7%$* *%64 41$-*%6 !,0,&' 1::%*7 $%-4 *%4* 717%6 :1$--%- :1-4%:717%6 *1$--177:%*$ *:71$%$ 6%: 41$47%*4 !,0,&' 1:7%4- $%44 :%* 717%: :1$4-%66 :1-%-717%: *1$--17$:%4 *:71$%:- 6%4 41$6%*- !,0,&'    ' ( ) ( &%$    ( *+    (  (          , -       . ( . / (    0 $(!  " "   #$% &' (  / (()*+   0    (#$% &'    ( ,++ )  0 5 7 : 567 ; 567 324%. 5 7 34% 5 7   *+ 5 7 *+  5 7 0   5 7 0  2  5 7 +    5 7 & 564"<7  *) 1:$%: $%$6 %$4 71*%6 :1$6%- :1-%71*%6 *1$--1-:%: *:71$:%6 $% 416$% !,0,&' 14%4 $*% % 71:% :1666%:: :1-%-771:% *1$--1-*%$- *:71$:%:- -%46 41674%4 !,0,&' 14*%7: $:%4- :*6%- 71%-* :16*-%$: :1-%-71%-* *1$--1-6:%:7 *:71$%7$ 6% 416:7%- !,0,&' 14-6% $4%* :*7%4 71$6%$4 :16:%*4 :1-%7*716%$4 *1$--16%-4 *:71$%7 -%: 416%4- !,0,&' 1*-% $4%* :*7%4 71$7%$ :16%-$ :1-4%*$717%$ *1$--16:$%46 *:71$$%- % 41-6-%: !,0,&' ' *    T + 1 337.856-7201 1058 Baker Hughes Drive Broussard, LA 70518, USA Aug 08, 2022 AOGCC Attention: Kayla Junke 333 W. 7th Ave., Suite 100 Anchorage, Alaska 99501-3539 Subject:Final Log Distribution for ConocoPhillips Alaska, Inc. 1G-02L1 Kuparuk River API #: 50-029-20813-60-00 Permit No: 222-075 Rig: CDR3 The final Coil deliverables were uploaded via https://copsftp.sharefile.com/ for the above well. Items delivered: Digital Las Data, Graphic Images CGM/PDF and Survey Files. Thank you. Signature of receiver & date received: Please return transmittal letter to: Jenny Jones Jenny.E.Jones@conocophillips.com Luis G Arismendi Luis.arismendi@bakerhughes.com PTD: 222-075 T36857 Kayla Junke Digitally signed by Kayla Junke Date: 2022.08.10 09:02:28 -08'00' STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________KUPARUK RIV UNIT 1G-02L1 JBR 07/22/2022 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:1 Kill line valve Tango 1 Failed was greased and passed retest. Closer Times = Ann.= 17 sec., 3 RAMS = 4 sec. each, 2 HCR's = 1 sec each, Precharge pressures 8 total = 2@1150psi, 1@1120psi,4@1100psi, 1@1050psi. Test Results TEST DATA Rig Rep:R. Madson / K. EnfieldOperator:ConocoPhillips Alaska, Inc.Operator Rep:S.Kiser / J. Newell Contractor/Rig No.:Nabors CDR3AC PTD#:2220750 DATE:7/1/2022 Type Operation:DRILL Annular: 250/2500Type Test:INIT Valves: 250/3500 Rams: 250/3500 Test Pressures:Inspection No:bopBDB220704080045 Inspector Brian Bixby Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 6.5 MASP: 3267 Sundry No: Location Gen.:P Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Drl. Rig P Hazard Sec.P Misc NA Upper Kelly 0 NA Lower Kelly 0 NA Ball Type 2 P Inside BOP 0 NA FSV Misc 0 NA 12 PNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 0 NACH Misc Stripper 1 2"P Annular Preventer 1 7 1/16"P #1 Rams 1 Blind/Shear P #2 Rams 1 2" Combi P #3 Rams 1 2 3/8" Combi P #4 Rams 1 2" Combi P #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 2 1/16"P HCR Valves 2 2 1/16"P Kill Line Valves 5 2 1/16"FP Check Valve 0 NA BOP Misc 3 4 1/16" Swab P System Pressure P3050 Pressure After Closure P2400 200 PSI Attained P20 Full Pressure Attained P42 Blind Switch Covers:PYES Nitgn. Bottles (avg):P4@1787 ACC Misc NA0 P PTrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector 0 NAMS Misc Inside Reel Valves 1 P 9 9 9 999 9 9 9 9 FP Kill line valve Tango 1 Failed Closer Times = Ann.= 17 sec., 3 RAMS = 4 sec. each, 2 HCR's = 1 sec each, Žƒ•ƒ‹Žƒ† ƒ• ‘•‡”˜ƒ–‹‘‘‹••‹‘ 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov   James Ohlinger Staff CTD Engineer ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510 Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1G-02L1 ConocoPhillips Alaska, Inc. Permit to Drill Number: 222-075 Surface Location: 1012' FSL, 289' FWL, Sec. 29, T12N, R10E, UM Bottomhole Location: 2O22' FNL, 211O' FWL, Sec. 31, T12N, R1OE, UM Dear Mr. Ohlinger: Enclosed is the approved application for the permit to drill the above referenced well. The permit is for a new wellbore segment of existing well Permit No. 182-138, API No. 50-029-20183- 00-00.Production should continue to be reported as a function of the original API number stated above. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Jeremy M. Price Chair DATED this ___ day of June, 2022.  Jerem y Price Digitally signed by Jeremy Price Date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y Samantha Carlisle at 8:34 am, Jun 09, 2022 'LJLWDOO\VLJQHGE\-DPHV-2KOLQJHU '1& 8628 &RQRFR3KLOOLSV2 :HOOV&RLOHG7XELQJ'UOOLQJ &1 -DPHV-2KOLQJHU( -DPHV-2KOLQJHU#FRSFRP 5HDVRQ,DPWKHDXWKRURIWKLVGRFXPHQW /RFDWLRQ\RXUVLJQLQJORFDWLRQKHUH 'DWH  )R[LW3')(GLWRU9HUVLRQ -DPHV-2KOLQJHU ; '/%  $YDULDQFH WR  $$&  E LV JUDQWHG WR DOORZ WKH NLFNRII SRLQW WR EH DQ\ SRLQW DORQJ WKH SDUHQW ODWHUDO ; ; 66 ; '65  97/  '/% ;   '/% ;  .% %23 WHVW SUHVVXUH WR  SVLJ $QQXODU SUHYHQWHU WHVW SUHVVXUH WR  SVLJ ; 'ULOOHUV 79' ; VV  dts 6/28/2022 JLC 6/28/2022 6/28/22 Jeremy Price Digitally signed by Jeremy Price Date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ƒ XVIWLQ **/ZS7LHLQSRLQWIURP*.237RSRI:KLSVWRFN7'6(&7,21'(7$,/66HF0' ,QF $]L 79'VV16(: 'OHJ 7)DFH96HFW                                                                                                                     :(// '(7$,/6 *16 (: 1RUWKLQJ (DVWLQJ /DWLWWXGH /RQJLWXGH    ƒ 1 ƒ :3URMHFW .XSDUXN5LYHU8QLWB6LWH .XSDUXN*3DG:HOO *:HOOERUH */3ODQ */ZS:(//%25('(7$,/6 */3DUHQW :HOOERUH *7LHRQ0' $]LPXWKVWR7UXH1RUWK0DJQHWLF1RUWKƒ0DJQHWLF)LHOG6WUHQJWKQ7'LS$QJOHƒ'DWH0RGHO %**0706RXWK  1RUWK   XVIWLQ      :HVW  (DVW   XVIWLQ **/ZS7LHLQSRLQWIURP*.237RSRI:KLSVWRFN7'5()(5(1&( ,1)250$7,21&RRUGLQDWH 1( 5HIHUHQFH :HOO*7UXH1RUWK9HUWLFDO 79' 5HIHUHQFH 0HDQ6HD/HYHO6HFWLRQ 96 5HIHUHQFH 6ORW 1( 0HDVXUHG'HSWK5HIHUHQFH *#XVIW * &DOFXODWLRQ0HWKRG 0LQLPXP&XUYDWXUH*/ZS*/ZS 3URMHFW .XSDUXN5LYHU8QLWB6LWH .XSDUXN*3DG:HOO *:HOOERUH */3ODQ */ZS:(//%25('(7$,/6 */3DUHQW :HOOERUH *7LHRQ0' $]LPXWKVWR7UXH1RUWK0DJQHWLF1RUWKƒ0DJQHWLF)LHOG6WUHQJWKQ7'LS$QJOHƒ'DWH0RGHO %**0706RXWK  1RUWK   XVIWLQ                :HVW  (DVW   XVIWLQ 6RXWK  1RUWK   XVIWLQ                :HVW  (DVW   XVIWLQ *  **/*/*     **$/*$/******* **/*/3%<<<  <  <*/ZS5()(5(1&( ,1)250$7,21&RRUGLQDWH 1( 5HIHUHQFH :HOO*7UXH1RUWK9HUWLFDO 79' 5HIHUHQFH *#XVIW * 6HFWLRQ 96 5HIHUHQFH 6ORW 1( 0HDVXUHG'HSWK5HIHUHQFH *#XVIW * &DOFXODWLRQ0HWKRG 0LQLPXP&XUYDWXUH*/ZS          !  "##$ % & "##$   ' ( ) (    *  (  +, *  (              -$ .# / !    0  0 1    #  (#   /  ! !   "  ! # 1! $%&    *  ( '() *+, / *  (  - %  ! )  #) ' ( 2  ! )#)""(.+$/0   , (.+11",     2 3" 2 "  45 "  -* 0    0 0*0   !   3)    #   #  !  %(   /   4!      (    *  * * 6)7   #! ) &2(82&5).8 &528() ) .697.)8: 5(659.).&- 0 0 !    #   #  4!   /   * 5460 56 !  %(   * * *#   * * ) ) &2(82:&.)8 &52:)(. )0 / 4   *) .6978)(.( 5(6598)5&- 0 1  (   789 3   / 7+9 )    789   )    (! ;  7<< &)5 8). &.28&)75 /! , !  #  !  ! # 1%1%=$ ,  (  (   /3)7+,9 7#!*9 56 7#!*9   (  789 5460 7#!*9 + : /82() &)))) ;(   789 < )#/ 789 5460 7#!*9 +3: 789 56 7#!*9  !#   / 7#!*9 +,-  ! ) 7#!*9   786#!*9 -#   786#!*9 +#  786#!*9   ( ! +  ))))7277&)5528&):27)&5):.&7)882() &)8&):)5).727:.):528)88:2&8).&5).5&7).82(5&) ))8)8)72788)52875):.:2.5)85).5&8)(782(.5) ))5&)5&)7255&)57528::).(:2(7)(5).5()(257)5 (&)5&))575&)72:).52:.)7:25).55)888)5:(257)5 (7):)(()7&.)72&7)52&88)5:28)5&)(88)5(2&7) ().))&.)728)(:52()7.:27)(85)&888)5(2(7) .8)5)8()&&)72)(752&5).:27)(5)7:()8:2&7) .&):).8).(.)7287)75728.:)77:2&)&):(5)82777) 8):)::)(.)72.5):&72.&:)8(:2()7&8)&()5&25&7) ):)8().)727)72&8)8::28)&)&:8()&2:77) ().)).)72.8)728()&:2)7&()&:8()72(77) ().)).)727():7277):2&)7.).:8()772(7)      ' ( ) (    *  (  +, *  (              -$ .# / !    0  0 1    #  (#   /  ! !   "  ! # 1! $%&    *  ( '() *+, / *  (  - %   !#   / 7#!*9 ;(   789 < )#/ 789 5460 7#!*9 ,  (  (  7#!*9   786#!*9 56 7#!*9   #  +,-  ! ) 7#!*9  /  7#!*9  4!  7#!*9 + *( < )#/ 789 82() &7)8 5):. :27)& &2.:5)& )528&) 7277&)5 &2(.:287&)5 &7:2.&7):5) +   *) 82(5&) &7). 5).5 :2&8).& &2.(5) ).528)88 727:.): &2(.:28.)5. &7:2.)(&)8& ":+*0/ !($ 82(.5) &8)(7 5).5 :2.5)8 &287)&8 8)52875):. 72788) &2(.:28&)&. &7:2.)) (2) .):7 5).5 :28&)88 &287):5 5&)5285:)& 7258)&( &2(.:2.(7)(8 &7:2:8):8) (257)5 () 5).5 :2(7)( &28::)( 5&)528::).( 7255&)57 &2(.:2..7)& &7:2:57)(:) (2) 8.)85 ::)8 :2(5)8 &2(5)77 5&)5288)8 725(()&8 &2(.:2.&:)87 &7:2&8()((&) (2) 8&)8 7)7 :2)& &2(5)8( 5&)528&)&& 72&():: &2(.:2.8.): &7:25(.):.(5)& (27) 8&)5( 7&:)5: :28)(( &28&7)(: 5&)52.:5)78 72:75)7( &2(.:28.5)&5 &7:25&5)5.():: (25) 88)75 5)55 :25):: &2.&.) 5&)52:.)78 72:).: &2(.:2(::):( &7:258&):8.)87 (257)5 88)5: 5)8 :25).5 &2.&5)7 5&)52:.)7 72:). &2(.:2(:8)(: &7:258.):58&)8 (2&) 88) 5()&( :2.):& &2::5) .)52:7)8 72&7)8 &2(..27:)7. &7:2&&.).(7) (2&7) 88)5 &)( :28)5 &2:57)7 .)52&88)5 72&7) &2(..2&) &7:2&.5)8()8 (2:) 88)5 5&)8 :2): &2&.):8 .)52&7.)5& 725&&)5( &2(..2)7( &7:2:7)5() (2.) 88)8 78)8 :25)55 &25..)7 .)525:7)&8 72788). &2(..2.:): &7:2:(8)(&8()8 (28) 88)& 7).( :2.).5 &27.()& .)5278)& 7277)&: &2(..2&8)55 &7:2.&:)8()&8 (2() 88)5 5).( :27)8( &2.()7 .)52(5) 7287) &2(..275:):5 &7:287)(8()7& (2(7) 88)5 5)&8 :27)(8 &2.:)7 .)52()7. 728)(: &2(..275()78 &7:285)778()7 2) 8(): ()85 :277) &2.()5( &)52): 725&)7 &2(..257()7 &7:285)5(.8) 2) ()7 5)(& :277)58 &28)5 &)52:) 72&)55 &2(..2&75)8: &7:28:()8:..)( 2&7) ()8: )7: :27)(5 &28)55 &)52&5). 72)(7 &2(..2&8:)5 &7:288)(..)88 2) (). ()8 :27)8( 52(8)( .)528)&. 72(5)& &2(..2:7): &7:28():.&) 27) (7)& )5 :2.)75 52888):7 .)72(()& 7285). &2(..2.7)(8 &7:2()..&). 2777) (5)8 ): :2&)& 528&8)58 .)728.:)77 7287)75 &2(..2.:5)( &7:2().7.&)78 25) (): 5):7 :2)5 52.(:).: .)728()& 728)&5 &2(..287). &7:2(7):8) 25&7) ()5& 8)& :2()7& 52.5:)&: .)72.&:)8( 72.5):& &2(..2885)7. &7:2(8).88): 2&) ()88 )7( :28)5 52.)7 .)72.)&( 72::):. &2(..2(7). &7:2(:)&) 2:) 8():& 8)8 :2.)(7 52:)8. .)72:7)(( 725)8 &2(.82.)55 &7:2(5)&.). 2:77) 8()& )&: :28)& 52&.) .)72&8)8: 727) &2(.82&8): &7:2(&)7.) 2.) 8()& &)8. :2()7 52&7)& .)72&()& 72()8 &2(.82)75 &7:2(.)(:() 28) 8(): 8)8. :2)57 525:) .)725):5 728.).8 &2(.82)& &7:2((7)858()(5 2() 8()( )8. :2):( 527)8( .)727)& 72.8)57 &2(.827()&8 &7.2):&8()8& 2(77) 8()7 7&()&: :2) 528)8 .)728()& 72.8) &2(.827&)&8 &7.2)8(8().: 2) 8()7 5)& :2)( 52) .)72) 72.&)8 &2(.825()& &7.25).&() 2) 8()7 )& :25)7 525).. .)727) 72:)75 &2(.82&8): &7.2.):(8()(5 2(7) 8()77 .).: :2&)7 5277)7( .)7277) 727(): &2(.82:8):( &7.25)5.8()8: +      ' ( ) (    *  (  +, *  (              -$ .# / !    0  0 1    #  (#   /  ! !   "  ! # 1! $%&    *  ( '() *+, / *  (  - %  + ) / 6) !!  / +, 7#!*9 /  7#!*9 4!  7#!*9 56 7#!*9 5460 7#!*9 + !  #  #   789   = 789 > () &2(.:28()& &7:2.)7:52.5:)5 728:)57) ).69&)8( 5(659()(.- !   0 ?>:5)7 *8() * +:7)&%@258&)2777&)5$, > ) &2(.:28()& &7:2.)7:() ) ). &2(.:28(5)&5 &7:2.7)7&() 57)& 7&)5 7 &2(..25.)&& &7:2(&.)77() :8:)(5 ..)88 5 &2(..2:::)&: &7.2:)7() .(5). 2:)( &&2(.82&.)&: &7.2::)7() 8).8 2&7:)85 :&2(.8257)&: &7.28).() 88)7 2.).( .&2(.82::)&: &7.2(5).() 87): 2&): 8 &2(.(2)&: &7.27:)&() 8.&)7 2.) (&2(.(2)&& &7:287&)&() &.5)8 2&..): &2(.825.)&& &7:28&)8() &&)5 27&)7 &2(.82()&5 &7:2.(8)(() &77)8 (()&7 &2(..288&)&5 &7:2.&5)7() 58.)7 .5)(7 7 &2(..2&(8)&5 &7:2:.5)7() 5&).8 &:)7( 5 &2(..27(()&7 &7:2&87)77() 77). ,  (   / 7#!*9  !#   / 7#!*9 !   )   7 9 .  )   7 9) !   ! 7<8A:2&)72(7))7.& 7)  !#   / 7#!*9 ,  (  / 7#!*9 5460 7#!*9 56 7#!*9 (   ! ))    ! 82() :27)& 528&) 7277&)5 %   * ! 82(5&) :2&8).& 528)88 727:.): 1%*-3  0 2(7) :2&)7 7277) 727(): %                    !  "# "$  "$ % "$ %&  '()     %$#  * +       +  !" # $%,-.* +    & '/ +  !" # $%.* +      (*  + ) 0 * +" # 1+ *  &      #+* 2+ 3   " + 21+" # * 24,. 4+-.) /   ( 0## .  * . ) +, 13** ,-.* +     #+ .  )+ *  1#+   #+ 1*+ 5   +    ) &" ( 2  3( (   & ,04, 5,)- ,-.6  1  1 78 9 # # *. &  /" # :;!"  ;!<" # * =     # <;" # , 1  %  #4+  )2 )% 1  # + ">! (((  - ?   ) #+ 5 6* 7  ,) .   ,0 6247 , 6* 7 . /9<9 52.-* . 5( " :;!" $% *. 0  0  *.   ( (:;!" ;!<", 1 $,% 3** 2$24$. ) *  # .  6* 7 3** # .  6* 7 ' &   6* 7 ' & 1  6* 7   5  2 )   0 .          ( ; - ; 5    !;" !;@/" <@"A <!"!> >@"!/> - ; 5>  >,  >,;!!"> :;!!" !>"@< :@":< A"AA/ >  >,  >,;!>"@> :;!>/" !A!">< :@":> A"A!@        *    (   &+ ; 5      # ; -        '()     %$#  * +       +  !" # $%,-.* +    & '/ +  !" # $%.* +      (*  + ) 0 * +" # 1+ *  &      #+* 2+ 3   " + 21+" # * 24,. 4+-.) /   ( 0## .  * . ) +, 13** ,-.* +  A  : @       @ A :   *  ( . , ((  ; ;  ?>; >,; >, ? , -  - 2 . (    & 6  (    '     !:<;   B @ ( &+  #  6 "<C  *(   /C 7 "  0## .   &  0## .  # .   &   !" # $%        *    (   &+ ; 5      # ; -        '()     %$#  * +       +  !" # $%,-.* +    & '/ +  !" # $%.* +      (*  + ) 0 * +" # 1+ *  &      #+* 2+ 3   " + 21+" # * 24,. 4+-.) /   ( 0## .  * . ) +, 13** ,-.* + " <" A" !"    5   @ A :  *  ( . 2  0     *  )   (   )0 .+    5   ; ;  ?>; >,; >, ? , -  - 2 . (    & 6  (    '     !:<;   B @ ( &+  #  6 "<C  *(   /C 7 "  0## .   &  0## .  # .   &   !" # $%        *    (   &+ ; 5      # ; -        /DVW7DJ $QQRWDWLRQ 'HSWK IW.% (QG'DWH :HOOERUH /DVW0RG%\ /DVW7DJ5.% (VW RI)LOO/HDYLQJ RI2SHQ$ 6DQGV   * ]HPEDHM /DVW5HY5HDVRQ $QQRWDWLRQ (QG'DWH :HOOERUH /DVW0RG%\ 5HY5HDVRQ8SGDWHG7DJ'HSWK  * ]HPEDHM &DVLQJ6WULQJV &DVLQJ'HVFULSWLRQ &21'8&725 2' LQ  ,' LQ  7RS IW.%  6HW'HSWK IW.%  6HW'HSWK 79' «  :W/HQ O«  *UDGH + 7RS7KUHDG :(/'(' &DVLQJ'HVFULSWLRQ 685)$&( 2' LQ  ,' LQ  7RS IW.%  6HW'HSWK IW.%  6HW'HSWK 79' «  :W/HQ O«  *UDGH . 7RS7KUHDG %7& &DVLQJ'HVFULSWLRQ 352'8&7,21 2' LQ  ,' LQ  7RS IW.%  6HW'HSWK IW.%  6HW'HSWK 79' «  :W/HQ O«  *UDGH . 7RS7KUHDG %7& 7XELQJ6WULQJV 7XELQJ'HVFULSWLRQ 78%,1*:2 6WULQJ0D«  ,' LQ  7RS IW.%  6HW'HSWK IW«  6HW'HSWK 79'  «  :W OEIW  *UDGH - 7RS&RQQHFWLRQ %877$%02' &RPSOHWLRQ'HWDLOV 7RS IW.% 7RS 79'  IW.% 7RS,QFO ƒ ,WHP'HV &RP 1RPLQDO ,' LQ    +$1*(5 0&(92<78%,1*+$1*(5     6$)(7<9/9 &$0&275'3$66$6$)(7<9$/9(:$6/2&.('287       6($/$66< %$.(502'(/*6($/$66(0%/<     3$&.(5 %52:1+%5(75,(9$%/(3$&.(5     %/$67-7 67((/%/$67-2,176      %/$67-7 67((/%/$67-2,17383     3$&.(5 %52:1+%5(75,(9$%/(3$&.(5     %/$67-7 67((/%/$67-2,17      1,33/( 27,6;1,33/(     /2&$725 %52:1/2&$72568%     3$&.(5 %52:1%3(50$1(173$&.(5     6%( %52:16($/%25((;7(16,21     0,// %52:10,//287(;7(16,21     1,33/( &$0&2'1,33/(12*2     626 %52:16+($528768%(/0'77/# GXULQJ,352)RQ    3HUIRUDWLRQV 6ORWV 7RS IW.% %WP IW.% 7RS 79'  IW.% %WP 79'  IW.% /LQNHG=RQH 'DWH 6KRW 'HQV VKRWVIW 7\SH &RP     &&*   ,3(5) GHJ*HR9DQQ7&3     &81,7%*    ,3(5) *HR9DQQ7&3GHJ  3KDVLQJ     $*   53(5) 7LWDQGHJ3K     $*   ,3(5) 626(QHUMHWGHJ3K 0DQGUHO,QVHUWV 6W DWL RQ 1 R7RS IW.% 7RS 79'  IW.% 0DNH 0RGHO 2' LQ 6HUY 9DOYH 7\SH /DWFK 7\SH 3RUW6L]H LQ 7525XQ SVL 5XQ'DWH &RP    &$0&2 00*  *$6/,)7 '0< 5.       &$0&2 00*  ,1- '0< 5.       &$0&2 00*  ,1- '0< 5.       &$0&2 00*  ,1- &9 5.       &$0&2 00*  ,1- &9 5.    1RWHV*HQHUDO 6DIHW\ (QG'DWH $QQRWDWLRQ  127(9LHZ6FKHPDWLFZ$ODVND6FKHPDWLF  127((/,1(&21),50('/($.,1*&60# *$0 9HUWLFDOVFKHPDWLF DFWXDO 352'8&7,21 53(5) ,3(5) 626 1,33/( 0,// 6%( 3$&.(5 /2&$725 1,33/( ,1-(&7,21 ,3(5) ,1-(&7,21 3$&.(5 ,1-(&7,21 ,3(5) ,1-(&7,21 3$&.(5 6($/$66< *$6/,)7 685)$&( 6$)(7<9/9 &21'8&725 +$1*(5 .83,1- .%*UG IW  5LJ5HOHDVH'DWH  *  7' $FW%WP IW.%  :HOO$WWULEXWHV )LHOG1DPH .83$58.5,9(581,7 :HOOERUH$3,8:,  :HOOERUH6WDWXV ,1- 0D[$QJOH 0' ,QFO ƒ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ŽĚŝĨŝĞĚ ďLJ::KϯͬϮϮͬϮϬϮϮ &VDQGSHUIV   0' */ZS 3ODQQHG7'a 0' 7RSRIOLQHUa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ompanyConocoPhillips Alaska, Inc.Well Name:KUPARUK RIV UNIT 1G-02L1Initial Class/TypeSER / PENDGeoArea890Unit11160On/Off ShoreOnProgramSERField & PoolWell bore segAnnular DisposalPTD#:2220750KUPARUK RIVER, KUPARUK RIV OIL - 490100NA1Permit fee attachedYes2Lease number appropriateYes3Unique well name and numberYes4Well located in a defined poolYes5Well located proper distance from drilling unit boundaryYes6Well located proper distance from other wellsYes7Sufficient acreage available in drilling unitYesDirectional plan view included, no land plat.8If deviated, is wellbore plat includedYes9Operator only affected partyYes10Operator has appropriate bond in forceYes11Permit can be issued without conservation orderYes12Permit can be issued without administrative approvalYes13Can permit be approved before 15-day waitYesAIO 2C14Well located within area and strata authorized by Injection Order # (put IO# in comments) (ForYes15All wells within 1/4 mile area of review identified (For service well only)YesWell will not be pre-produced.16Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA17Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)NA18Conductor string providedNA19Surface casing protects all known USDWsNA20CMT vol adequate to circulate on conductor & surf csgNA21CMT vol adequate to tie-in long string to surf csgNo22CMT will cover all known productive horizonsYes23Casing designs adequate for C, T, B & permafrostYes24Adequate tankage or reserve pitNA25If a re-drill, has a 10-403 for abandonment been approvedYes26Adequate wellbore separation proposedNA27If diverter required, does it meet regulationsYesMax formation pressure is 3880 psig(12.1 ppg EMW); will drill w/ 8.6 ppg EMW and maintain overbal w/ MPD28Drilling fluid program schematic & equip list adequateYes29BOPEs, do they meet regulationYesMPSP is 3267 psig; will test BOPs to 3500 psig30BOPE press rating appropriate; test to (put psig in comments)Yes31Choke manifold complies w/API RP-53 (May 84)Yes32Work will occur without operation shutdownYes33Is presence of H2S gas probableYes34Mechanical condition of wells within AOR verified (For service well only)NoWells on 1G-Pad are H2S-bearing. H2S measures required. (KRU 1G-11A reportedly measured 100 ppm35Permit can be issued w/o hydrogen sulfide measuresYeson 12/16/2013.)36Data presented on potential overpressure zonesNA37Seismic analysis of shallow gas zonesNA38Seabed condition survey (if off-shore)NA39Contact name/phone for weekly progress reports [exploratory only]ApprDLBDate6/23/2022ApprVTLDate6/23/2022ApprDLBDate6/15/2022AdministrationEngineeringGeologyGeologic Commissioner:Date:Engineering Commissioner:DatePublic CommissionerDate-03JLC 6/28/2022