Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
210-157
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Thursday, October 12, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Sully Sullivan P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL ConocoPhillips Alaska, Inc. 2Z-23A KUPARUK RIV UNIT 2Z-23A Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 10/12/2023 2Z-23A 50-029-22544-01-00 210-157-0 W SPT 5759 2101570 1500 2690 2690 2690 2675 200 260 260 260 4YRTST P Sully Sullivan 8/14/2023 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:KUPARUK RIV UNIT 2Z-23A Inspection Date: Tubing OA Packer Depth 1130 1820 1760 1750IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSTS230816131302 BBL Pumped:1 BBL Returned:0.8 Thursday, October 12, 2023 Page 1 of 1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday, Monday, August 26, 2019 TO: Jim Regg q-31)/1 SUBJECT: Mechanical Integrity Tests P.I. Supervisor �jGt 1 r ConocoPhillips Alaska, Inc. 2Z -23A FROM: Adam Earl KUPARUK RIV UNIT 2Z -23A Petroleum Inspector Src: Inspector Reviewed B P.1. Sopry � NON -CONFIDENTIAL Comm I Well Name KUPARUK RIV UNIT 2Z -23A IInsp Num: mitAGE190825085919 Rel Insp Num: API Well Number 50-029-22544-01-00 Inspector Name: Adam Earl Permit Number: 210-157-0 Inspection Date: 8/20/2019 Packer Well 2Z23A Typelnj I G TVD PTD 2101570 - Type Test' SPT !Test psi BBL Pumped. I - BBL Returned: Interval 4YRTST PIF Notes: MIT IA ' Depth 5759 - Tubing 1500 - IA I OA P Pretest Initial 15 Min 30 Min 45 Min 60 Min 3805 3805 3805 3805 1725 2500 2465 _ 2465 20 - 30 - 30 30 Monday, August 26, 2019 Page 1 of 1 • • 2 % S S.5 WELL LOG TRANSMITTAL# To: Alaska Oil and Gas Conservation Comm. March 4, 2016 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 MAR 08 2111;) DATA LOGGED 3/tel Anchorage, Alaska 99501 /2olte M.K.BENDER A C RE: Multi Finger Caliper: 2Z-23A Run Date: 1/22/2016 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com 2Z-23A Digital Data(LAS), Digital Log file, Casing Inspection Report, 3D Viewer 1 CD Rom 50-029-22544-01 Multi Finger Caliper(Field Log) � � `� '�`'t' 1 color log 50-029-22544-01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline &Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed: rX),tizadzo,,, teLeoc,eeet • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg � d /(3//5" DATE: Wednesday,August 26,2015 P.I.Supervisor v el SUBJECT: Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC 2Z-23A FROM: Johnnie Hill KUPARUK RIV UNIT 2Z-23A Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry -- NON-CONFIDENTIAL Comm Well Name KUPARUK RIV UNIT 2Z-23AAPI Well Number 50-029-22544-01-00 Inspector Name: Johnnie Hill Permit Number: 210-157-0 Inspection Date: 8/6/2015 Insp Num: mitJWH150810105831 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 2z-23AType Inj W 1TVD , 5759 Tubing 2400 - ' zaoo- 1 2400 2400 PTD 1 2101570 - Type Test SPT Nest psi, 1500 - IA 800 1800 - 1730 - 1730 - Interval14YRTST P/F 1 P OA 1110 110 110 110" Notes: scio Wednesday,August 26,2015 Page 1 of 1 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Q.16-.)Q - 457 Well History File Identifier Organizing (done) /Two-sided I IEII 111111111 ❑ Rescan Needed III 11111111111111 RE AN DIGITAL DATA OVERSIZED (Scannable) for Items: ❑ Diskettes, No. ❑ Maps: Greyscale Items: Other, No/Type: G2 ND,j Other Items Scannable by a Large Scanner i-,G,S ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: rr BY: Clti.2.......) Date: 7// /s/ Project Proofing I 111E11111 Ini P BY: Maria Date: �F7Ll../7/4 /s/ Scanning Preparation a x 30 = ( .d + & = TOTAL PAGES 6 (Count does not include cover sheet) BY: ACP Date: 4/7// 1 /s/ fil + f Production Scanning 111111111110 11111 Stage 1 Page Count from Scanned File: b (Count does include cove eet) 7 Page Count Matches Number in ScanningPreparation: YES NO p BY: 420 Date: I L is/Op Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: Is/ Scanning is complete at this point unless rescanning is required. IIIIIIIIIIIIIIIIII ReScanned 111111111IIIIIIIII BY: Maria Date: /5/ Comments about this file: Quality Checked II 11111111111H • • O o Da c v m 3 ti < m Or _ -o CDN ico IN p nOapomuaa a c <U ,.. U 2 F- O To o m Q z o o N y N N N N N U Z E M M M M C N Q o 2 c C C C C C E d Y S S N 0. N N 0 0 it• .; c a n a a o Q U - OU 0 0 0 0 0 0 o coI a '� co a o 0 0 0 o o L O a 3 m $ co 0o co co co d y dCL 7.1 z U -o _ ,, o 0 0 0 0 0 aya Em III J d uco a ) Z 1111 W 0 -) > Co) 0 Z a • (0 as I Z L co z Q S � Z ~ 2 y co o I a 7 co = 0 I CL 0 U) o !1 0 0 0 0 C .2 E I 2g N a) 6 8 y d O to E p_ 0 I N (2) (4) it V ^ 0 E I J I cn M ;! (Q NN , •li j III N OII p r ~ O2 5 Z N• N I II co � �II G m r- Ali ilii co I /� y W cc C I II > > a� I C/) a o I u, Q n • Cz F— °' a I Q o_ ZILu www rn u� .N .y .y E O , .y .y .y .y i ld '� 0 Z 7CD CD 0 CD C I. �'1 C C C C C C --4 y a O O .O O O O n o > > > > o o L L O , H Z a- 5 C V V V •d Z . cmV L E ��^ in o ZO i w . a coo w H m O Q L C d A 7 N C 1 } d r 2 ZO O~ 2 W c Z O N O F- L f° w a y LL �. > LL o 0 •� _O Z V C ,+�_+ Li y _y R J d o a0 D 0 5 �-� ¢ J aas Z Q °) c o- Luu. _ m Z �' c w 5 ! Z W a) " ` \ L O o H 2 1 E co E j Q y J J U Q U O. T.> E Q a) o w i Q a =y 'c) '.3 a a 0 0 0 0 o m 0 m . c a i U o a • � o i- 3 _1o � Q' w J J J w 3 Q 0 Q� MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg ') DATE:Tuesday,September 06,2011 c P.I.Supervisor i 1Cl9 11 SUBJECT:Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC 2Z-23A FROM: John Crisp KUPARUK RIV UNIT 2Z-23A Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry JPr-- NON-CONFIDENTIAL Comm Well Name: KUPARUK RIV UNIT 2Z-23A API Well Number: 50-029-22544-01-00 Inspector Name: John Crisp Insp Num: mitJCr110829095730 Permit Number: 210-157-0 Inspection Date: 8/26/2011 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Type J — r — Well 2Z- 3A T e In . P TVD 5759 ' IA 460 2020 -1 1980 1970 1 2Z-23A � — — I p.T.DI TypeTest Test psi 11500 OA i 30 100 1 100 i 100 I— 1 Interval 4YRTST p/F P Tubing 2600 2625 1 2625 i 2600 1 Notes: 2.1 bbls pumped for test. Tuesday,September 06,2011 Page 1 of 1 STATE OF ALASKA ALASKA, -AND GAS CONSERVATION COMMISSI REPORT OF SUNDRY WELL OPERATIONS 1.Operations Performed: Abandon r Repair well r Plug ltrforations r Stimulate rOther Prod to WAGINJ Alter Casing r Pull Tubing r Perforate New Fbol r Waiver r Time Extension r Change Approved Program r Operat.Shutdown r Perforate r Re-enter Suspended Well IT 2.Operator Name: 4.Well Class Before Work: 5.Permit to Drill Number: ConocoPhillips Alaska, Inc. Development F7 Exploratory r - 210-157-0 3.Address: 6.API Number: P. O. Box 100360,Anchorage,Alaska 99510 Stratigraphic r Service r •• 50-029-22544-01.-0C) 7. 0-029-22544-01•- 7.Property Designation(Lease Number): 8.Well Name and Number: ADL 25646,25645 — 2Z-23A 9.Field/Pool(s): Kuparuk River Field/Kuparuk River Oil Pool 10. Present Well Condition Summary: Total Depth measured 10810 feet Plugs(measured) None true vertical 6073 feet Junk(measured) None Effective Depth measured 10810 feet Packer(measured) 7289, 7299, 7313, 7500,7553 true vertical 6073 feet (true vertucal) 5741, 5748, 5759, 5899, 5932 Casing Length Size MD ND Burst Collapse CONDUCTOR 80 16 121 121 0 0 SURFACE 4201 12 4242 3474 0 0 PRODUCTION 7472 7 7507 6232 0 0 LINER A 2907 2.625 10810 6073 0 0 0 0 0 0 0 0 Perforation depth: Measured depth: 7923-8445, 8447-10810 E E ,. True Vertical Depth: 6065-6073, 6073-6073 J Mt4 21 Tubing(size,grade,MD,and TVD) 2.875,J-55, 7596 MD, 5948 TVD Masks Gil& faPA CAIS. Csrnnnssion AJII CD Packers&SSSV(type,MD,and ND) NIPPLE-CAMCO W-1 CTIVE LANDING NIPPLE @ 7289 MD and 5741.TVDf f g8 PBR-BAKER PBR •► 299 MP and 5748 ND PACKER-BAKER'NFL' 'ETRIEVABLE PACKER l�A 1 and 5759 TVD WINDOW'A-SIDETRACK WINDOW @ 7500 MD an. 5899 ND SLEEVE-C-CAMCO CV-1 SLIDING SLEEVE(CLOSED 11/25/2004)@ 7553 MD and 5932 ND NIPPLE-CAMCO DS LANDING NIPPLE @ 493 MD and 491 ND 11.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 12. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 271 455 330 1198 184 Subsequent to operation 0 2799 633 2166 13.Attachments 14.Well Class after work: Copies of Logs and Surveys run Exploratory r Development r Service- F Stratigraphic I-- . . 15.Well Status after work: Oil r Gas r WDSPL Daily Report of Well Operations GSTOR r WIND r WAG 15 GINJ T r SUSP r SPLUG 16.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: / J �` 311-182 Contact Kelli Wilmot L �c ` (/`.fib' Printed Name Kelli Wilmot ((( Title Drilling &Wells Engineering Technician Signature Phone:265-6309 Date:7/13/11 Form 10-404 Revised 10/2010 RBDMSJ(f 4 20 7./7-i( Submit Original Only A7/ t M 2Z-23A DESCRIPTION OF WORK COMPLETED SUMMARY Date Event Summary 6/16/11 DRIFT TBG TO 2.80"&TAGGED LINER TOP @ 7462' RKB. MEASURED SBHP @ 7450' RKB (2203 psi) & GRADIENT @ 7316' RKB (2197 psi) SET 2.81" MA-2 PLUG @ 7288' 'RRB. P/T TBG TO 2500, PASSED. IN PROGRESS 6/17/11 Summary PULLED OV @ 7245' RKB. LOAD TBG & IA W/245 BBLS DIESEL. SET DMY VLV @ 7245' RKB. MITIA TO 3000 PSI, PASSED. PULLED 2.81" MA-2-PLUG @ 7288' RKB. COMPLETE 6/22/11 MITIA(Passed), Initial T/I/O= 2160/175/180. IA FL @ NS. Pressured up IA with 4 bbl of diesel, Start MITIA. T/I/O= 2160/3000/260 15 min T/I/O= 2160/3000/260, 30 min T/I/O= 2160/3000/260. Bleed IA down, Final T/I/O= 2160/900/180. 6/22/2011 PM Initial State Witnessed MITIA- Passed, (John Crisp). Initial T/I/O= 2270/980/160, Pressured up IA to 3000 psi with 2.4 bbls of diesel. Start MITIA, T/I/O= ✓ 2270/3000/260, 15 min T/I/O=2270/2860/250, 30 min T/I/O= 2270/2820/245, bleed IA down. Final T/I/O= 2270/425/120. { • A N M cO as a) N Q O co .ii \ ) 0 al II \\ Q E co II \\ as ir, inII \\ a) O N Q p m 11 \\ CU N— C W 11 \\ J co .- p E TO T, \ Q O a) E Z -3 Ial -- f,a \\\ \\ -0 0 N aoDo \\ \\\ N II - CC m N O N 11 00 En se 11 m ti N - II II N V N O] ns N. co o 13-1 Y 11 II N. o_ aU ECm m // i CO cn (d - o N Co Y // / occ — ai a) - / a) a E E cK C c @ Lo N. m Y // // ^ N "O ti .N U N M N N Lu c I\ // (1 o^ m v v v m^ N n m m r- '� c w o m CO rn I! 11 a ^ o a 2 Lu 0 @) 0 �' 0 3 Ua \\\ I I 11 d o cn m 2 0 m U 0 .� \\ 1( ,1,- I1 o f in CL U \\ I I w o U -, 0 0 - CZ X 0) I/ I . E M o Co N _, E CO . o_ c 11 Q m o c o 0 rn 0 O c) U U U x O w Ir' pi. /I ^'oo_.m 63 N N N N Y Y N E N N N I• I ~ m F _ CO CO CO CO CO CO (+) U M F- ) A // , / ,I �// E i 0 / �i t III I IIII III .L '� - • oTn c .. • • � EL . Co .. .I -.-,- , pi III N I a N 0 (Si COwwww o t 08 I0 2 U io V IO N In CO (D n) � v ����� � � � cn 00m N @ o) 0-N- J Y J U) V a 0 . CO O O O Q N (p O 00 a) Coa0 in y n (n - co N 22 1(n c a) vv Q � � F-- N. i � m (n nrti N m7- f(0nov < `OU Carr M N N (Si MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Tuesday,June 28,2011 TO: Jim Regg 1i11,7(ZI t P.I.Supervisor ter``(( I SUBJECT:Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC 2Z-23A FROM: John Crisp KUPARUK RIV UNIT 2Z-23A Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry .J NON-CONFIDENTIAL Comm Well Name: KUPARUK RIV UNIT 2Z-23A API Well Number: 50-029-22544-01-00 Inspector Name: John Crisp Insp Num: mitJCr110628112829 Permit Number: 210-157-0 Inspection Date: 6/24/2011 Rel Insp Num: Packer r Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 2Z-23A' Type Inj. W 1 TVD r 5759 - IA 980 3000 2860 2820 ' p.T.D1 21o1570 �TypeTest L PT Test psi 1500 '1 Op 160 260 250 245 Interval INITAL —_ p/F P Tubing 2270 2270 2270 2270 --- Notes: 2.4 bbls pumped for test.This well must have been pre produced before injecting.Permit numbers match with Operator. Tuesday,June 28,2011 Page 1 of 1 simirE ALAsEA "BB�dd SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 Darrell R. Humphery Production Engineering Specialist ConocoPhillips Alaska, Inc. / ✓ I 5 7 P.O. Box 100360 - -�- Anchorage, AK 99510 -mss Re: Kuparuk River Field, Kuparuk River Oil Pool, 2Z-23A Sundry Number: 311-182 Dear Mr. Humphrey: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Chair DATED this 2 day of June, 2011. Encl. • ( '�' ,i RECEIVED x , STATE OF ALASKA Z 1\ 1 ALASK.,JIL AND GAS CONSERVATION COMMISSION vA' u4.Y 2 0 ?LI1 a APPLICATION FOR SUNDRY APPROVALS (4" 20 MC 25.280 Alaska Oil &GAit Cm*.Gaiiniission 1.Type of Request Abandon r Rug for Redrill r Perforate New Pool r Repair well r Change Appr vi Pro_ram [ CI Rug Perforations Perforate (? Pull Tubing gn l'``• Operational Shutdown [ Re-enter Susp.Well r Stimulate r Alter casing [ Other:Prod to WAGINJ P• 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number. ConocoPhillips Alaska,Inc. Devebpment ,y Exploratory [❑ 210-157-0 • 3.Address: Sfratigraphic r Service n e.API Number. P.0.Box 100360,Anchorage,Alaska 99510 50-029-22544-01 • 7.If perforating,closest approach in pool(s)opened by this operation to nearest property line 8.Well Name and Number where ownership or landownership changes: Spacing Exception Required? Yes ❑ No Q 2Z-23A • 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL 25646;25845 Kuparuk River Field/Kuparuk River Oil Pool 11. PRESENT WELL CONDITION SUMMARY __ -- Total depth MD(ft): Total Depth ND(ft): Effective Depth MD(ft): Effective Depth ND(ft): Plugs(measured): Junk(measured): 10810 ' 6073 • 10810' 6073' Casing Length Size MD ND Burst Collapse CONDUCTOR 80 16 121' 121' SURFACE 4201 12 4242' 3474' - PRODUCTION 7472 7 7960' 6232' LINER A 2907 2.625 10810' 6073' Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 7923-8445,8447-10810 6065-6073,6073-6073 2.875 J-55 7596 _ Packers and SSSV Type: Packers and SSSV MD(ft)and ND(ft) NIPPLE-CAMCO W-1 SELECTIVE LANDING NIPPLE MD=7289 ND=5741 PBR-BAKER PBR MD=7299 TVD=5748 PACKER-BAKER'HFL'RETRIEVABLE PACKER MD=7313 ND=5759 WINDOW'A'-SIDETRACK WINDOW MD=7500 TVD=5899 SLEEVE-C-CAMCO CV-1 SLIDING SLEEVE(CLOSED 11/25/2004)MD=7553 TVD=5932 NIPPLE-CAMCO DS LANDING NIPPLE MD=493 ND=491 12.Attachments: Description Summary of Proposal WI 13. Well Class after proposed work: • Detailed Operations Program r BOP Sketch C l Exploratory [ Development ❑ Service C 14.Estimated Date for Commencing Operations: 15. Well Status after proposed work: 6/1/2011 Oil r Gas [ WDSPL fl Suspended r 16.Verbal Approval: Date: WINJ r GINJ r WAG E • Abandoned r Commission Representative: GSTOR[ SPLUG I- 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Darrell Humphrey/Bob Christesen Printed Name Darrell R.Humphrey Title: Production Engineering Specialist Signature Q AU Phone:659-7535 Date 'S- u-/ • j \ Commissi Use Only Sundry Number. 41 I 1a Conditions of approval: Notify Commission so that a representative may witness .1 V Plug Integrity r BOP Test [ Mechanical Integrity Test W Location Clearance Other. Subsequent Form Required: ile)—Yo7! APPROVED BY /2/1 Approved by: ,14—, l .,)1 jCCOMMMMISjSIOONNER THE COMMISSION Da e: �JR161NAt 5 JUN cte I Form 10-403 Revised 1/2010 � Q`,Z mit in Duplicate 4 1 2Z-23A DESCRIPTION,SUMMARY OF PROPOSAL ConocoPhillips Alaska Inc. requests approval to convert KRU Well 2Z-23A, 2Z-23AL1,2Z-23AL1-01 from Oil Production service to WAG Injection service.Well 2Z-23A will be used for reservoir pressure support for 2X- 18. The 16"Conductor was cemented with 200sx ASI (121' and/121'tvd). The 9-5/8"Surface casing (4242' and/ 3474'tvd)was cemented with 890sx AS III, and 480sx Class G. The 7" Production casing (7960' and/6232' tvd)was cemented with 338sx Class G. The top of the Kuparuk B was found at 7500'and/5899'tvd. The top of the Kuparuk A was found at 7792' and/6028'tvd. The injection tubing/casing annulus is isolated via Baker NFL"retrievable packer 3.5"located @ 7313' and/ 5759'tvd. 11/29/10 An MIT-TAG CMT @ 7395'SLM . MIT TBG#2500, PASS. COMPLETE. START MIT, (TBG#300, IA#225, OA#0), TBG#2525, IA#225, OA#0, WATCH 15 MINS, TBG#2450, IA#225, OA#0,WATCH 15 MINS, TBG#2430, IA#225, OA#0, **PASS** z;�„ r►ed rt) t) he Qn (q,Ccrdr rab re rie} (Cv;e'.- f7etessct, fir. v/e II w� - To wrieft, 2 y//7r , • KUP 2Z-23A ConocoPhillips 01 Well Attributes max Angle&MD TD Alaska,Inc. Wellbore APIIUWI Field Name Well Status not(') MD(RKB) Act Btm(RK8) „ywyps 500292254401 KUPARUK RIVER UNIT INJ 101.34 9,495.41 10,810.0 •-" Comment H25(ppm) Date Annotation End Date K8-Grd(R) Rig Release Date "' SSSV:NIPPLE Last WO: 40.60 2/12/1995 We Cont.:-27-23A 1232011 12:39'.39 PM Schematic-Actual Annotation Depth(MB) End Date Annotation Last Mod...End Date Last Tag:SLM Rev Reason:GLV C/O Imosbor 1/29/2011 Casing Strings Casing Description String 0... String ID...Top(Mt B) Set Depth(L.Set Depth(TVD)...String Wt..String... String Top Thrd HANG=_R,37 .. LINER A 2 3/8 1.995 7,902.7 10,810.0 6,073.1 4.60 L-80 STL _ Liner Details Top Depth (TVD) Top not I 1. Noma... Top(RKB) (MB) Ii Item Description Comment ID(in) 7,902.7 6,063.9 87.52 BILLET Liner Top Billiet 1.995 _ 7,911.7 6,064.2 90.65 ANCHOR Open hole anchor 1.995 8,446.2 6,073.2 88.76 SLEEVE Deployment sleeve 1.995 -- 1 Tubing Strings CONDUCTOR, Tubing Description String 0... String ID...Top(RKB) Set Depth If...Set Depth(TVD)... String Wt...String... String Top Th re/ 41.121 TUBING 31/2 2.992 36.9 7,596.6 5,948.5 9.30 J-55 ABM-EUE Completion Details Top Depth (TVD) Top Incl Nora.. NIPPLE,493 Top(RKB) (RKB) (°) Item Description Comment ID(in) 36.9 36.9 -0.11 HANGER FMC E IV TUBING HANGER 3.500 492.5 491.2 9.15 NIPPLE CAMCO DS LANDING NIPPLE 2.812 I 7,288.9 5,741.2 42.23.NIPPLE CAMCO W-1 SELECTIVE LANDING NIPPLE 2.812 7,298.8 5,748.5 41.98 PBR BAKER PBR 3.000 7,312.5 5,758.7 41.25 PACKER BAKER'NFL'RETRIEVABLE PACKER 3.000 7,403.0 5,826.2 41.92 BLAST JTS BLAST JOINTS(FIVE 20',ONE 10') 2.992 SURFACE,__� 7,553.4 5,932.0 60.97 SLEEVE-C CAMCO CV-1 SLIDING SLEEVE(CLOSED 11/25/2004) 2.750 91-4,242 7,568.0 5,937.5 65.33XO Reducing CROSSOVER 3.5"x2.875(ID 2.441,6.3#,J-55,ABM-EUE) 2.875 7,568.8 5,937.9 65.58 LOCATOR TIW LOCATOR SEAL ASSEMBLY 2.437 GAS LIFT, 7,570.7 5,938.8 66.13:PACKER TIW SS PERMANENT PACKER 2.347 7,246 • 7,586.6 5,945.6 70.92 NIPPLE OTIS XN NIPPLE 2.313"PACKING BORE,2.25"NO GO 2.250 Il 7,595.8 5,948.4 73.67 SOS BAKER SHEAROUT SUB 2.441 NIPPLE,7,289 1 F. Perforations&Slots Shot iLTop(TVD) Btm(TVD) Dene Top MB),Btm(RKB) (R1(8) MB) Zone Date (Oh... Type Comment PBR,7,299 MI 7,923.0 8,445.0 6,065.3 6,073.2 12/13/2010 32.0 SLOTS'slotted pipe-0.125'x2.5"@ 4 PACKER,7,313 circumferential adjacent rows,3" centers staggered 18 deg,3' 111+ non-slotted ends �... -- 8,447.0 10,810.0 6,073.2 6,073.1 12/13/2010 32.0 SLOTS slotted pipe-0.125'x2.5"@4 circumferential adjacent rows,3" INJECTION, centers staggered 18 deg,3' 7,357 non-slotted ends IPERF, 7,400PE°R'F - Notes:General&Safety 7,445-7,495 End Date Annotation WHIPSTOCK, 12/27/2010 NOTE:WELL SIDETRACKED 2Z-23A,AL1,AL1-01 7,500 WINDOW.A• 1/1/2011 NOTE VIEW SCHEMATIC w/Alaska Schematic9.0 SLEE 7,560 7,553 ';1 LOCATOR, 7,571 PACKER,7,571 NIPPLE,7,587 U CMTMT PLUG, 7,,39595 STAGE 1, 7,395 `, PRODUCTION, 35-7,960 ]i {I II I 1\- Mandrel Details Top Depth Top Port (TVD) incl 00 Valve Latch Sian TRO Run Stn Top(MB) (RKB) Ii Make _ Model (in) Sery Typo Type (in) (poi) Run Date Com... 1 7,245.6 5,708.9 41.61 CAMCO MMG-2 1 1/2 GAS LIFT OV RK 0.250 0.0 1/15/2011 2 7,357.3 5,792.1 41.37 CAMCO MMM 11/2 INJ DMY RK 0.000 0.010/20/2010 SLOTS. 7,923-8,445 IF, SLOTS, 6,447-10,810 LINER A 7,903-10,810 TD(22-23A), 10,810 oit FW: Status: Well 09-44A- Sung--- set to expire 3/24/11 Page 1 of 2 v Schwartz, Guy L (DOA) From: Schwartz, Guy L(DOA) Sent: Wednesday, March 23, 2011 9:28 AM To: 'Smith, Phil G (ASRC)' D f p 0/0 - / $7 Subject: RE: Status: Well 09-44A-Sundry set to expire 3/24/11 Phil, To extend the Op Shutdown you will have to submit a new 10-403 request with an explanation attached. (As per 20 AAC 25.072 (d) ) Call me if you have any questions. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Smith, Phil G (ASRC) [mailto:Phil.G.Smith@bp.com] Sent: Tuesday, March 22, 2011 2:30 PM To: Schwartz, Guy L (DOA) Subject: FW: Status: Well 09-44A - Sundry set to expire 3/24/11 Guy, This sundry is set to expire in a couple days...what can we do to extend another year? We have no plans to go back into the well in 2011 (maybe 2012). Thanks, Phil From: Barker,Elizabeth R(SAIC) Sent: Tuesday,March 22,2011 11:05 AM To: Smith,Phil G(ASRC) Cc: Barker,Elizabeth R(SAIC); Hubble,Terrie L Subject: Status:Well 09-44A-Sundry set to expire 3/24/11 Phil, Terrie has flagged Well 09-44A Sundry is set to expire on 3/24/11. Please advise what is the well's current status so we can take the appropriate action. I am picking on you because you were the"engineer" but Greg Hobbs was the one who signed as Engineering Team Leader. Thanks Liz Barker 3/23/2011 . FW: Status: Well 09-44A- Sund- et to expire 3/24/11 Page 2 of 2 SAIC,Projects Analyst BP,ADW Support 4-5674 <<09-44A Appr Sundry, 03-24-10.ZIP» 3/23/2011 //M® PRINT DISTRIBUTION LIST BAKER HUGHES COMPANY CONOCOPHILLIPS ALASKA,INC. INTERMEDIATE FINAL Yes (mandatory) WELL NAME RUN NUMBER (mandatory) FIELD KUPARUK RIVER UNIT BH SALESMAN (mandatory) (mandatory) COUNTY NORTH SLOPE BOROUGH BH DISTRICT (mandatory) (mandatory) STATE ALASKA PAGE OF (mandatory) LOG DATE: TODAYS DATE: (mandatory) DISTRIBUTION LIST AUTHORIZED BY: (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY E-LOG E-LOG ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) FIELD FINAL LAS (CD) LIS (CD) FILM PERSON ATTENTION #OF PRINTS #UI-I'HIN I S#OF COPIES#OF COPIES#OF COPIES 1 1ConocoPhillips Alaska,Inc. I I 1 I I I NSK Wells Aide,NSK 69 ATTN:MAIL ROOM 700 G Street, Anchorage,AK 99501 2 :1OGCC I 1 I I 1 I Christine Mahnken 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 0/0 — �7 Do-3-t-0 I � 3 1BP , I 1 I I 1 I Petrotechnical Data Center,MB33 David Douglas P.O.Box 196612 Anchorage,Alaska 99519-6612 ,/0- iS 8 a OSS r 4�CHEVRON/KRU REP I 1 1 I 1 I Glenn Fredrick P.O.Box 196247 f 1IL/ Anchorage,Alaska 99519 Q-0-31D 5 Brandon Tucker,NRT I I I I 1 I State of Alaska;DNR,Div.of Oil and Gas 1550 W.7th Ave,Suite 800 I Anchorage,Alaska 99501-3510 TOTALS FOR THIS PAGE: 0 4 4 TOTALS FOR ALL PAGES: 0 4 0 4 McMains, Stephen E (DOA) From: NSK Prod Engr Specialist[n1139@conocophillips.comj Sent: Tuesday, February 08, 2011 1:34 PM To: McMains, Stephen E (DOA) Subject: Request for changes to 2Z-23A, 2Z-23AL1, and 2Z-23AL1-01 Well Completion Report Importance: High Steve, We are requesting a correction to the recently submitted 10-407's on wells 2Z-23A(PTD 210-157), 2Z-23AL1 (PTD 210- 158), and 2Z-23AL1-01 (PTD 210-184). Specifically, we are requesting a status change from 1WINJ to 1-OIL as these injectors are to be pre-produced for a minimum 60 days with production potentially continuing for an indefinite period. First production is planned to start within 5 days. Bob Christensen / Darrell Humphrey NSK Production Engineering Specialist ConocoPhillips Alaska,Inc. Kuparuk Office: 907.659.7535 Kuparuk Pager: 659.7000; #924 CPAI Internal Mail: NSK-69 This email may contain confidential information.If you receive this e-mail in error,please notify the sender and delete this email immediately. 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la.Well Status: ON] elotkiGas ❑ SPLUG ❑ Other ❑ Abandoned❑ Suspended ❑ lb.Well Class: 20AAC 25.105 20AAC 25.110 Development ❑ Exploratory ❑ GINJ ❑ WINJ WAG El WDSPL ❑ No.of Completions: , Service E] Stratigraphic Test El 12.Operator Name: 12.Permit to Drill Number: 5.Date Comp.,Susp., ConocoPhillips Alaska, Inc. or Aband.: t(m r 27,2010 210-157/ 3.Address: 6.Date Spudded: 13.API Number: P.O.Box 100360,Anchorage,AK 99510-0360 December 6,2010 50-029-22544-01 4a.Location of Well(Governmental Section): 7.Date TD Reached: 14.Well Name and Number: Surface: 1304'FSL,334'FEL,Sec. 11,T11N,R9E,UM December 11,2010 2Z-23A Top of Productive Horizon: 8.KB(ft above MSL): 112'RKB 15.Field/Pool(s): 2229'FSL,608'FEL,Sec. 10,T11N,R9E,UM GL(ft above MSL): . 70.6'AMSL Kuparuk River Field Total Depth: 9.Plug Back Depth(MD+ND): 2537'FNL, 1922'FEL,Sec. 10,T11N,R9E, UM 10810'MD/6073'ND Kuparuk River Oil Pool 4b.Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+ND): 16.Property Designation: Surface: x-529376 y- 5966062 Zone-4 10810'MD/6073'ND ADL 25646,25645 TPI: x-523818 y- 5966968 Zone-4 11.SSSV Depth(MD+ND): 17.Land Use Permit: Total Depth: x-522502 y- 5967477 Zone-4 landing nipple©493'MD/491'ND 2577,2576 18.Directional Survey: Yes ❑✓ No❑ 19.Water Depth,if Offshore: 20.Thickness of Permafrost MD/TVD: (Submit electronic and printed information per 20 AAC 25.050) N/A (ft MSL) 1331'MD/1268'ND 21.Logs Obtained(List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-drill/Lateral Top Window MD/TVD GR/Res 7500'MD/5899'ND 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CEMENTING RECORD CASING SIZE WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE PULLED 16" 62.5# H-40 Surf. 121' Surf. 121' 24" 200 sx AS I - 9.625" 36# J-55 Surf. 4242' Surf. 3474' 12.25" 890 sx ASIII,480 sx Class G 7" 26.0# L-80 Surf. 7960' Surf. 6232' 8.5" 338 sx Class G 2.375" 4.6# L-80 7903' 10810' 6063' 6073' 3" slotted liner 24.Open to production or injection? Yes ❑ No ❑ If Yes,list each 25. TUBING RECORD Interval open(MD+ND of Top&Bottom;Perforation Size and Number): SIZE DEPTH SET(MD) PACKER SET(MD/TVD) 3.5" 7597' 7313'MD/5759'ND slotted liner7571'MD 15939'ND 7923'-8445'MD 6065'-6073'ND 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 8447-10810'MD 6073'-6073'ND (A___143.- DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,gas lift,etc.) shut-in Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO Test Period--> Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API(corr) Press. psi 24-Hour Rate-> 28. CORE DATA Conventional Core(s)Acquired? Yes ❑ No ❑✓ Sidewall Cores Acquired? Yes ❑ No E If Yes to either question,list formations and intervals cored(MD+ND of top and bottom of each),and summarize lithology and presence of oil,gas or water (Submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. RECE NM NONE .lAN 2 0 ;?Ott Vis��j �p�� it0 Gil 2,,iG ons.C iiss10D Form 10-407 Revised 1i /MS JAN 2 010 CONTINUED ON REVERSE 4 n0(peg®riginal only 28. GEOLOGIC MARKERS(List all formations and markers encountered): 29. FORMATION TESTS NAME MD TVD Well tested? Yes ❑✓ No If yes,list intervals and formations tested, Permafrost-Top ground surface ground surface briefly summarizing test results. Attach separate sheets to this form,if Permafrost-Bottom 1331' 1268' needed,and submit detailed test information per 20 AAC 25.071. B3 7542' 5926' B2 7697' 5976' B1 7750' 6012' A6 7792' 6004' A5 7805' 6035' A4 7836' 6049' A5 7978' 6061' A4 8010' 6062' A3 8710' 6098' A2 9280' 6122' N/A A3 9391' 6111' Formation at total depth: Kuparuk A3 30. LIST OF ATTACHMENTS Summary of Daily Operations,schematic,final directional survey 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Jill Long @ 263-4093 Qa 01/0 Printed Na e V. a Title: Alaska Wells Manager ' Signature Phone 263-4619 Date V J/ZGI Sharon Allsup-Drake INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1a: Classification of Service wells: Gas injection,water injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection,Observation,or Other.Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13:The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20:Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 28. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,showing the data pertinent to such interval). Item 26: Method of Operation: Flowing,Gas Lift, Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other (explain). Item 27:Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 29:Provide a list of intervals tested and the corresponding formation,and a brief summary of this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 _1 I \\ N V'k w2 1 \\ R 8 C7 ! \\ °d Q O d o@ 1 m.43 a c Z m m \\ \ m c, J ti N 2 \\ \\ Q O O _ 0 co-o N n °' N Q C „o m o \\ \\ N co Q (v mco E NEm CO lb CC Y CC Q N 11 11 N- - I co c\I �, 1I I cn Ol N- N Q m -- er // 1 r— m m W - o T � Y Y ib J/ / Ct -o a) ---— c ir) co (// // 'Li Es, co Vcr) Jo C cc Et c V�N.11 N- a) Y 11 // r F- "-=-. > O a) V gd cc 11 / v m a co ca Q W C') a) r` n .0 N Q m CD) LC) 1\ III Q o o a c� °� �g c� � � co a \\ If I f oho m Y 0 3 \\ I I o E t £r U a) 26 1 v in Cl_ co U - Z �� `o .- o O -) O O - Q. O0 00 0 X I1 _ `m E 'k N ,1 E m r a N o= m as m a7 (0 `- I (6 U N -C1 1j \ °, U of 0 0 cru 0 o x 0 3 1 v= 1 ' o m N N N N Y Y N ( N >> N N 1i 11 N O m rn U r r r `- a5 O A 3 A A 11 0 m c%) ai (� m m (b �y U m �— M ri Iii i // .1 n i�i� / co V I J� ir,.i Cl \ii IIlIII i- i 4 (I) _r_____n_______1___ i_Hk_____ 1 C Ul ,. - 7.-2t.,-4.'--_3 ,.._ -,'---.J"-- "..111 II -TT . 4 i ,, \ 2 II 111 1 N I a (V Q `mwwww b t co w]� u 0)V CCD N to N CO W i� P- r- a) N C0 a O CO r O (NI U(� 0-N r- J ce V) V g 2 O N 80 O N b CO N = Q 9L a) ..1- d. Qr- r � a N N N co ai it) TO (n O ,t \Q (° g UN- N- M N N N KU P 2Z-23A Conoc©Philli y. v 1 rlbites_ Max Angle&MD TD Aiaska inc. Y 4y' Wellbore APIIUWI Field Name Well Status Incl I°) (ftKB) Act Btrn(11K13) , 5002922544011KUPARUK RIVER UNIT ]Well 101 34 ID 9,495 41 I 10,810.0 I Ca.rfr et+i m Date !Annotation nd Date LE Last -wjC-'14- .- : A 4111132g6,pIL_.---Ann�tab°SPM Pt ( ) IEndDate 1Revtation :SDETRAOCK IELATERALS IKB-G 40.60 Modr9 End Date Release gct0 otates Da h RKB End Dat Annotation 'Last Mod.-E d Date ast Tag Casing Strings Casing Description String 0... String ID...Top(RKB) Set Depth(t...Set Depth(TVD) String Wt...iString...String Top Thrd HANG,,17 so- LINER A I 2 3/8 1 1.995 I 7,902 7 I 10,810.0 1 6,073.1 4.60 L-80 STL Liner Details_ W.."..a_na3iatII Depth - -- ' - - (TVD) Top Intl Hoed... '{ IITop(RKB) (RKB) (7 Item Description Comment - - ID(in) L. 7,902.7 6,063.9 87.52 BILLET Liner Top Billiet 1,995 7,911.7 6,064.2 90.65 ANCHOR Open hole anchor 1.995 8,446.2 6,073.2 88.76 SLEEVE Deployment sleeve 1.995 Tubing Strings CONDUCTOR, o - Tubing Description String 0... String ID...Top(RKB) Set Depth(t...Sat Depth(TVD) String Wt...'String... String Top Thrd 41-121 i•, TUBING 3 1/2 � 2.992 --. 36 9 'Set 6 I 5,948.5 I 9 30.___1 J 55 I ABM EUE_ 1. . Completion Details Top Depth -' (TVD) Top Inol Nomi... NIPPLE,493 Top(MB) 1968) (1 Item Description Comment ID(in) 36.9 36.9 -0.11 HANGER FMC E IV TUBING HANGER 3-500 492.5 491.2 9.15 NIPPLE CAMCO DS LANDING NIPPLE 2.812 7,288.9 5,741.2 42.23 NIPPLE CAMCO W-1 SELECTIVE LANDING NIPPLE 2.812 7,298.8 5,748.5 41.98 PBR BAKER PBR 3.000 7,312.5 5,758.7 4125 PACKER BAKER'HFL'RETRIEVABLE PACKER 3.000 7,103.0 5,826.2 41.92 BLAST JTS BLAST JOINTS(FIVE 20'.ONE 10') - 2.992 SURFACE, 7,553,4 5,932.0 60.97 SLEEVEC CAMCO CV-1 SIJDING SLEEVE(CLOSED 11/25/2004) 2.750 i. 41-4,242 T.. 7,568.0 5,937.5 65.331 XO Reducing CROSSOVER 3.5'x2.875(ID 2.441,6.38,JSS,ABM-EUE) 2.875 7,568.8 5,937.9 65.58 LOCATOR TIW LOCATOR SEAL ASSEMBLY 2.437 GAS 416 7,570.7 5,938.8 66.13 PACKER TIW SS PERMANENT PACKER -- 2.347 ,' 7,586.6 5,945.6 70.92 NIPPLE OTIS XN NIPPLE 2.313"PACKING BORE,2.25"NO GO 2.250 7,595.8 5,948.4 73.67 SOS BAKER SHEAROUT SUB 2.441 NIPPLE,7,289 Perforations&Slots Shot Top(TVD) Btm(TVD) Dens �.- Top(RKB) EMI(11103) (RKB) (ftKB) Zone Date (sh-. Tye Comment l PER,7,299 --- i 7,923.0 8,445.0 6,065.3 6,073.2 12/13/2010 32.0 SLOTS sloped pipe-0.125x2.5"@ 4 circumferential adjacent rows,3" PACKER,7,313 - centers staggered 18 deg,3' 1111 non-slotted ends 8,447.0 10,810.0 6,073.2 6,073.1 12/13/2010 32.0 SLOTS slotted pipe-0.125'X2.5"@ 4 circumferential adjacent rows,3" INJECTION. '. centers staggered 18 deg,3' 7,357 non-slotted ends (PERF,_ 7.4007.416 :i 7,445-7,495 End Date Annotation WHIPSTOCK, _--- -- - -- t� 1227/2010 NOTE:WELL SIDETRACKED 2Z-23A,AL1,AL1-01 7,500 WINDOW A•, ;,F 1/1/2011 NOTE:VIEW SCHEMATIC w/Alaska Schematic9.0 7,500 SLEEVEL,I £ "`-'- -- LOCATOR I „ PACKER,7,571 l 4 NIPPLE,7,587 `5 805,7,5901 ;.'a i- CMT PLUG, 7,395 STAGE 1. 7,305 PRODUCTION, 35-7,960 I L Mandrel Ntails Top Depth Top - ��_---_- Port (TVD) Inc) OD Valve Latch Size TRO Run Ste Top(NCB) (R(B) (") Make Model (In) Som TYPn TYPe lin) (psi) Run Date Com... 1 7,245.6 5,708.9 42.11 CAMCO MMG-2 1 12 GAS LIFT DMY RK 0.000 0.0 5/6/1995 2 7,3573 5,792.1 41.50 CAMCO MMM 1 12 INJ DM9 RK 0.000 0.0 10202010 SLOTS, 7,923-0,445 ---14 I SLOTS, 8,447-10,910 LINER A, TD(2 TO 1223-12-23A), 10,810 111 0 1111 Net Z m V al O Q fL OMNI • ca o U tO .> N _ - N Q EN N L o. L Z CNI Q W - 2 U0 Q Q. Q. MN m ca N 9 (V GJ 0 `1 `1N � m 0 0 co 1 opo -c._, O U (fl N O) N O O (0 O V 1- C V >.w O d M- N O N a V L C r_ > N MO p ;� 'O to c- d N_ V "C W N y 0)) LL < C C.) O--- N .. 0 O >.O O i '... ,- aQ O O o N 7 N N w 10 (O U N N N '6 J p = , c O d J J C7 o) a co Q u c £) r- M M Q N N N N O O > m o `o iB a E O O > a a) CV r C U C_ o M V W --- '' N ` 7j+ -. - C a N N N E } O c. O 70' C « O O y6 N N N N H �W N Q.) '°C- (II N - > U C) N O O U (4 C', c p (n & oN d .c c a,a) m r- C .-. N C c u O M O r-- N 2 N m c) CO O) r N O .0 C4 c D Z CO N a o- p) O (3)_ 1 i0 c : =pd O Q. N 2 ' z i6 V - Ct N-Q Cn N® "Cc CN VR C . b • > O mp ) NN '.. N O C U d m Q rem E .s d 0 O Z O in J 1-• 22 Z N Q E W G - V O p C a 1- O c a) ami t0- 0 2 Q s E _c E w °) z w • N tU (3 Q O O.) O Q N E C M O N o N D m a (n H 0 CO Q 0 T-- .O m M U Z < E p O 0) Q N p w N O W CD w w w ,.° V V :.. j, N c 0 0 0 I. Z 0 0 0 N S > M M cts .� C-,1 Q O O O L N N �. N N U Q O C Q O N d 0 0 (i) N N a > m Z a E O , VI c a N a eZ a r- 0 (4 > N Y N N Z N < O co E _ ar.w 1.4"-3 :..� N @ co M fn cYQi d ' N O .,r: < O L D fl. O) 0 N C �O �` N O p I� -- ...as U M M M M (n Q 0 N Z W N 0 .N F.w„... i) Oc d co N N N Y J Z Q N t } ..T. N m p i '�( 0• Y Y N N N R N O _ co c 0 Til- dE - D y N N O (» 4-.. d4 7 " N .. In r..teC fU %- c.- EO M O c >. N O O O O a) c Z O o > OOCC ,--- p- N 4 CS) dfn Q N d - Q c a) p Ni y OM E - -N a O O. - 'N _ a) .mV y - U. (O IC) d VO NdN O NNN ddO <1.' C'S d 7 N 0 3 r- Nv0 a n 0 a 0 a 0 ¢ > > m 0 O) CO �yy� a �Ai 'r6���ii COinai . Q= � 5 5 5bow 45 r M Oa a Ha a a a o a a) (1) m '� O N N M CON Yn coO n o C aa a) a) a) ! Q C C C C 0 0 C) E CO Z O O H U > U N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 7 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 D > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 v) 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 co (O n n N N CO 0) (0 n n 0) O N- CO CO 0 " O N O n 0) V V O V U) 4) - C V. 0 CON CO N V CO V N O co .- (0 O N M ('? n 0) u) V u) O O M M " O W O , N 1,-D1 10 n g); n O O m V O 10 O M O N M W O 10 n n 10 N O O n M U -- ^N CO O) W O M N O OD O M V up t O n U) O N V O OO O " M N N N U V N N cV N CO CO co V V V V V U7 )0 U) u) U) 4- U) U O O (O co co O n n n n N Nco d v v v v v v v v v v V v v v v v v V v 4 v V v v v v v v v v N > a _ _ O O O_ N O M N N N V (O " N " V 10 a " (0 O O 00 l0 M O O O M O " O O O > d p V M (D N CO n V V " co co (0 V O " n co to O 47 ..- N co co co O n n to n p O (n O a r- n U) co V O O O O U) o NN ([i n t0 V CO U) co N O n oi V Y Q .7.:.. V co co co NCO M M N M M CO M M CO CO 7000104 N t (V CO CO j E 2 0) n " M O (D OD n a) O N N V M CO N OD O (00 N O V V CONVP CO N N 00 (00 U) C 0 O V N n 0 n V O O M 0i n n n n O OD O O V tri N co N O 6 V N O 6 N N N C co n V co CO M 0) n 0 V M N O O O O O CO a1 (0 CO N O 0) n N (N F W CO---, —O) 0) 0> co co co co CO n n n r- n r n n n n n � co (D (O to co co u co. 6 6 co V V d' V V V V V V V V V V' V V V V V V V R V v v v V V V V V NI W (UP LO LO 01 N (6O (6D 160 l60 (60 l60 l60 l60 (N0 467 l60 160 (60 (N N 6 67 N U N LL 46) (60 (N (N[) U) ptp ai fl) t1, U 0 0. �) (0 CO V_ V N V (O N N N 0) U) 7 V V CO N- n 0) O n V (D (0 N O 0) U) _ X O O 10 co co co co V (0 co Q1 CO n CO CO r0 n n 0) (0 10 n M N- CO CO (O N d O v N .-: N 6 O O N n V (0 O V N6 O O O O O (O V N O (O V O �'' C N V 6 n 0) — V n 0 N (0 co V n 0 co co 0) N V n O co .. Q) C C O. ^n n n n n n n n n n n co OD co 0) co. co. 0) 0 0 0 " " " .-- N N N co co a) -. 0 R .= u, to N N to U) an 47 u) U) to up to (D N N O U) co co co co O OO co OO co co (0 (0 a. N --CO CO O (0 CO CO (.0 (O CO CO CO O (D CO CO (D (0 CO CO CO CO CO CO CO CO O O 40 CO CO /. O '� O 0 O 0) 0) O a) 6) a) a) co O co co O O O 0) a) co co co co O O O O O co co co 0 (// - U• - C — Z 47 l0 u7 N lD U) U) )0 U) U) 4) u1 r0 r[i U) r0 r0 r0 t[i u1 6 U) O U) O U) 6' )0 t0 i0 `") 0 O Q) O C C O () U) a) }' w ry � R C p O w a) 0 U) co to N CO CO V n O n (D (O V (D CO (O CO O V N O CO CO n N- 0) V CO DO °' G 0 U a) N C4 >, R O N O n 0) M " c- N CO n co O co V N N •O CO (0 (O O O 'Q O O CO O O O /1 ig: — S N 4 > M (n O W O (O M n n M n O O O O (O CO n n N V p M ap O M u7 O V a) (II 7� aJ O M N os V (D a0 O N V U) l0 c0 (O O (O n 0 0 0) O N M 10 (O n aO O I8Ji U >0> O O R ^' co V V V V 10 10 r0 (0 co to (O (D c0 (O (O to (0 co co co (O n n n n n n n U) O > 0 Z U) 0 w v v g v q v v v q v v 1" -f y' q q ? q q v q q q' g v v v v v J + n n co n a Ml0 n n n (O O) CO l0 V n CO V O CO O N O V O O M (O O 0 N n l0 O n 10 N N a) O O O a0 N 0) 0) V M aD O N O CO 0) V V O O N M N O V V O O 6 V O N M V M M 6 6 O co D O c0 6 M M' (9 co co co co CO N 7 O CO (O V N a) n V O (0 N co (O W (0n 0 CO O CO' M M c? O? c? M C? M N N N N " " �- N N N N' Z t 00 " n n N CO U) V u7 co to V V O co co N co N co n 6 co (7) n CO V O N N n M CO O O 0 CO n CO OD 7 V M " N V co co co (O V V N 0 0 .- O V " N: r M V O OD n O U) M O U) (Ci 7. N O O O) V 47 (D n 6 0i O V) CO 0 N CO V V 0 CO CO O N M V u) (0 4) V ) l0 u) OO (O O CO co 0 w n 00 OO OO cO aD OD aD co co co CD 0) Orn rn rn rn 0) 0 u) (0 c0 U)0) CD 0) 0) 0) a) 0 0) 0) 0) 0) 0) "-- in- (C) u') UN u7 t0 ..6 (n tri( u7 (0 u) 4) 47 4') N N U) U) 47 U) U) (D 4) CO' (n (C) 4) u) U) H co " n n N co co V U) co (O V 7 V O (O 0 7 O N O) n CO M OO n CO V O) N N n M c0 0 (O N OD n CO U) V CO 7 N V O CO (O (0 V V N O O to CO O) O Cu.; O N O O n (0 N n n M V N M (O n O 0) O N M M M c,:_-i, U j w O) V U) (D O CD 0) " M V (0 V) O (D (O O c0 (O DO (O CO n n n n n n C 00 0) O) 0) O O 63 0) a) O O O 0 0 0 0 0 a 0 a a a 0 0 0 0 0 0 0 0'--. — f" v l) (0 N u) 6 6 u) N u7 O (D O O to (O (O (D co (O O 6 (O (O (O (O O (O (6 (6 (6 R (n C N CO N N V V n n 0 47 n V C) N M CO V O N V CO CO O n CO (O M Q D a " V " 0) 0) n 0) (O 0) M V (O OD N N O O O V ON- O M 0) N (0 u) CO M U) CO M n O M V V V N " O O (O 0) O N O V V 47 O N M V O O n n 6 M 4/1 2 O 4) CL N (O (D n n n OD 0) O N M M COV V l0 V M M 66666 M M M //yy > Q N N N N N N N M M co co M M co co co co M co M co co co co co co co M ida s Q N arr a soma ,-, Y UO i i • •W. O co R CO O M 0- N O CO M CO N" cO CO CO V 0) CO O N O co a) co V `- •- O n (0 n 47 V N O O C 0. CI. N N N O O O " V ao O u) O cocoM O V cococos- " V n (0 N O O O O O C N N N C c O V 6 N 00 6 W N ri N OD 6V 6 6 c6 O M U 0i n d) o6 n c0 0i O 0i C O Y Y N N N — " V (C) O n n n O CO u) to O (D n co O O a) co co co CO O CO CO CO CO CO co O co < n U O N N (0 O 4 s- CO O (D 0) n O CO ^ N UP O CO CO N V " 0) n O _ t" • T O M V O 0 V co V N M M0 MnSM V 000) " O47VVM ‘- to (0 O O O O M O O 0 0 0 0 0 O O O O O a O O O O O 0 0 0 0 O O 0 YOO)d 0 '- OM (OO OOD nVnOM (DOV ) OO Vn 0) M (OOMOO N (0OO=C CR 0 C T ) O COU (0 CO(O CO,f0 OO n n OD COO O COO 0 0 0 O O O O " " " N N N M CO - n O a U . .O T — i f� r r n n r n n n n n dD O O 0 0 D co co Qi O 0 co' FO t , O a` (n330 () v a m co0 o N CO 0 U a) 2 (a z 0 0 F • T N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 u) 25 55555 55525 52255 22255 55252 5552 V co M UO co O 0 (0 10 M 0 CO O V N- N N- CO N ti 0) 10 CO CO N O 00 c0 C n U) O 10 )0 1O c0 cD W. O M (O O V N O N- O V n 0) n n N- 0) N O) O N (°. M U 0 co co (O r U0 O c0 n N O V O CO 1- 0) (() N O 1- V N O CO CD V co O 00 ( (n co co (-) -- ^r 0) M U) co O N 10 r O CO IO a) O co CD 0) •- V N- O N O CO ' V h 0) N (0 N N "' U r r co co. co co a) a) 01 0? 0 0 0 0 .- ,- - N N N CO CO CO CO V 4- V V to (O coRIN U 0 V V V V V C 4 V V V tO 10 1n to 1n t0 1n 10 10 10 U) (0 10 IO O 10 0 10) N) u7 (O C N N > r... 0 Y OCV ----. CO O O N CO N N- LO 10 O CO CO 10 tO V N- CO N- N- a0 O N U) 5- UD 10 CO 0) CO N CO O O Q CO V V 00 IO CO 5- O V N M CO (0 N 0) M V U) CO 0 V V r' 10 CO 0) (0 10 (O O • d (n p O r co a0 ea aD d) O O V O N r 10 n 10 N O O LL) V O 10 t0 co N O Y 0 V G f0 c'D co co 3 _ 00 _ (V W E a c0 oz? CO0 01 1O CV N O 0) N n 0)15- CO O N V 0 0 6LO M) O coMV 0) IOO 10[) N cco N co V co CO 013 CO CO coCO N N r -C 0 O) — a) - LL) O N N 0) r V 1O c0 cV 6 V O N O 1O O V a) M r (D O M N N N I LL Q'CC CO V CO 0) W (D V N 0) 0- u) M O co O co 7 0) co V 0) CD M CO (O M CO N N t0 0 O 0 V '? V V V CO CO M 1M CO N N N N .- .- ,— O 0 O O 0) 0) 0) 0) (0 co V 7 V V V V V V V V V V V 4 V V V V V V V V V V V V M co co co M CV LL (NO 100 U) U) U) U)CV U) 1NO tO 1N0 U) U) 101 CV (j 10O 0) 1CV 0O 100 u0) (00 00) 01 0O 1Nt) 0O U) 1CV CV 0O LOLC)100 u0) N 100 00 t N !1) 0 U -aG C o . d .50) V 10 O V 0- V 0) V 0 N- M V O O V 7 O 00 V CO O M r ID V 0) O N •_ Y U O O. LO N N- Uu) CO O M N 10 UD 7 CO (O CO. U .51. (0 CO 0) 0) M t- t- 0) N- O >` y 0) N O V OV UO S— V (0 1O V cU M O N r. 6 r V n M d1n O (s0 O O C c0 CO CO CO O M N r CO CO 10 0- 0) 0 N V CO 0- 0) O N V 10 1• UO O co Q) I.50 C Q.0 co co V: V V V 10 co 1O 1O in (0 O co co (O n r n n N- n co co co co co co a) io o ^ - o .. O cu +� ��"c0 (0 (O (O co (O (O (o (O (O (O (0 (O (0 (O (O (O (0 (O (O (O (O (o (o (. (O (O (O (O (0 (O — '--'(O to co co co co co co co co co (0 co co co co co (0 co (0 co to co co (D co ID (0 (0 CO CO O C N .. .1 • 0 0) a) 0) 0) 0) 0) 0) 0) 0) a) 0) 0) a) 0) 0) 0) 0 0) 0) 0) 0) 0) 0) 0) 0) 0) 0 0) 0) 0) V z (n L LO Lo U) 1t) 1t) tri In 1n (f) 15 Ln In 1n 1() 1n U) Ln In 16 to 10 U) u7 1() U) u) tri In U) v V C U a) 0 a) O a) C "' O w a) 0 1) N- 0 CO 0) O N V 0- O h N O UO 0O M N CO O O V UD V `- N V a) n O Q` O E 0 a) CC T (6 dD O 0) O O V O m O 15- N (? O M N M N CO O CO N (0 O V •- (0 N N 5)- 0 U — z a) .B M 00 M 6) O M N S M V O M 0) 10 (O 6) M p M UO M O V O O n M 0) Cl) IO s N V t0 N- O co 10 N- Cr) (V V O co .— M (O co O co 1O co O Cr) CO CO M co co U >0 o .0.. • 0.0 M CO.. Uo CO CO 0) CO 0) 0) CO 0 0 0 0 . .- S s N N N Cl. CO CO CO CO V V V V o F- z ti) w v -r v v v v q q y- q v " u ui u) u) (r) u) u) u) (n .9 .9 1L i - 'CC 19 (c) u? (r (n CO V O (0 (O M n CO N CO h (0 0) (D CO CO U) 0) N 0) 1- le) (O CO C) V N CO O N V N- N 10 N N V co co co 0 t0 co co to r N CO •- 0) (O ai 0 r 0 •- 00 ' N N N V O a) ti ui M O) (O N aV V O 10 O 6 . N O (n V n 0) N V (0 0) UU U) N- 0) s— co V (,C, CO O .- M N CD CO 0) 5— CO V CO 15- 0) c") co co co V d- V V 10 1O a) t0 Lo co (0 O co co N- 15-- n n h n r UO co co O 0) 0) Z (.4 0) n a) V a) 10 00 r CO O CO N CD CD O .- CO 0) N 0) .- N N V N O N V co V r 0) O O CO O (0 V O N a) N 0) c0 N 05 — ID CO 0) CO O n 10 (V V W V V O O) O N CO 10 n W M 1O d) �- V O (D 10 V N O r a) (O (O O c0 a) 6 a) UO a) UO o0 a) 0) 0) a) 0) 0) O O O O O O C) .,-_, 6) 0 O 0) O) 0) 0? 0) 0) 0) 0) 0) 0) 0) 0) 6) 0) 0) O O O co. O O O O O O O O O "" 1n (O O 1O )6 (0 L6 10 1O1.6 (0 10 10 1O 1O l0 10 10 1O (O 10 (O O (O (O (0 (O p (O 16 (o I- N O 0) I,- 6) `- V 6) CD 00 N- CD O CO N CO CD O 03 0) N _ 0) N N V N O N V: CO V t` 0) O 0 UD O O V co N 0) N 0) O N N- t0 0) a) CO O r N M M V t0 O M O 0) M O 0O N V N d) (0 r 6 M f0 r O (D V O C) >w r n N- N- UO UO U0 UO 0) 0) O) O O O O O O .- .- N N N N (`) N N N N C 0 0 0 co co 0 D 0 0 co F v cD O (O co O cc (o (0 O O (O O (O co c0 c0 (D co. c0 (0 (O (o c0 (O (O (6 co (O (0 (O (0 co CO O C V O O CO ti N u) N O N 0) (0 N O M V tO Nn 0). CO 0) 10 0) 4) C N r n (0 Q -6 CO CO 6) V W O n CO d) O M CO V; N N n .- 0) ti M �- O O 41 V (n O- O) d I4 iii C0 `^ M N co N N Lo N N O M .- O 0 '' 0 0 CO 0 00000 O O O O O O 0) CO0CO . _ > Q 5 CO M CO CO CO CO M CO M CO CO CO M CO CO M CO M M M M M M CO M M M M N N N .�.) < 0- _ N n- Y • OU i i •� O lII (D CO co co co M O O N 10 N 10 0) M (0 M CO V (D O CO CO Co 10 co V a) CO CO V CO �si� C Ll Q N N N V co a) O '7 03 03 03 .- CO' 0) N- .- N O OO N- CO O V CO CO UO 0) 0) CO CO CO V N p� 0 O N N N o O CO (0 V M CO CO 00 V' V V' c0 0- 0- h CO (O 0) V LO 0- 10 V U) 1- 0) V' V V' V C tipi. U Y Y N N N — — co co co co co co co co co co co co co c0 (O a0 oo co co co co 00 co co co co co 0) p 0) 0) G �0 "'+� O CO O V 10 h CO CO N O (O c0 5— 0 0 0 u) 6) V CO n U) V I (O CO N 5— CO: ti 0 co N CO V M N c? M0 N M N CO ?1co N M (O 10 N (O V ) coN N 1tco V N N CO co .. T ((i u7 10 (O a) u7 (O IO IO N (O 10 (0 O 1O 10 1O 1O 1O (O It) 10 (0 10 IO 10 1O 1O (O 1O 10 O) C C .. 8 .. 0 — V N- O co a7 0) N 10 00 7 V 1- 7 M CO 0) N up co V N. O co co 0) N (0 CO f6 V O C T = VV V: (O 1O 1O 10 (O (0 (O 15- t- 15- UD 0O CO 0O O a) 0) O O O ,-- .- s N N N M V f"'1 a .Q 0) ; co co co co co CO 03 UD CO UD CO CO CO CO CO CO CO CO CO CO a) a) 6 Q1 a) a) a) m O O a) O LiJ .O-. U U o N U a u) �i 0 1A 0 (C M 0 N Q 0 0 U) E m z 0 0 I- T N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N d > 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 n 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 co O N N CO 0) O O M M n V O O - O 0 0) n CO CO CO N- O 1- � N V 73 C N .- co co •- V O) r O NI M M 0 O) V N- V (0 N r n r n co co t0 co O h V 0 M N6 co K O M N - O O co r O O (C) O V V M M N- N- N O O O O O 0) 6) co co U '- ^co V co O N 1O co V O CA N O O ' V N- O co O 67 N co co O co co co N NE U (C? co co co O N- n r O O O O O) O) O) C? 0 0 .- - .-- N N N M M M V V V CO j CD 10 O !n (6 t0 Un O 10 0 0 t0 O 0- 0 O O (O O t0 co O (O (0 O O O O (O O c0 N N y j O O 03 O j ` I- N O 0) O Un O (0 O CO N n 0 0 0 CO t0 CO r O Ns N O n M O CO r' CO 0 0 a U) O co t0 t0 5- I- N N N CO V. 0 s- aO 0 V CD N 0 CO O I- V Cc) N O 1- I� V 4 7 N- CV CV J O t0 r n CO V N N to M N to O .-- O O M N to V O r M (C) 6 M M O O M (v V U 0 Z In a © E_ (N`) N NW c - V' N 0 00 N- 0) O O OD N- 0) N 0 0 CO O N N 0) N 0 O _ 0 0 O N O N M CO CO CO O N- 0 N O N CO O 0 s- n .- 0 O N.- CO O N- O N V M O N < LO 0 V NNNa1)70 CA N r r) o r) N V O r) m of v 0 N.: o (Ni ri o v O co o CV o 0 0 r` M O OD C N u) LO N O N- V N 0) O CO CO O N O n O t() N O N- 0 CO O N N N F W O-�„ W c0 W I- N- h N- co co co I() Ln co co V V V V co co co N N N N .- r 7 0 0 0 m n. ri ri co co M M M ricori M M M M r) coco- M M ri M M M coM M M ri M M c) co N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Li to in Ln to in U) 1() 1n in in Ln 1n 6 6 co in Ln O in 4) 6 6 6 coLn L() co in coN Ln -. 0 U .a U) 0 C O SZ. a) d t co co N N CO O (V m N 7 Un CO CO CO N O C) VO V O O N LC) h O CO I,- (0 _ C V 0) to (O V' (0 (0 V N N 4 in N. O .- Ln CD M _ 0) O Ln (0 N4. CO. 7 O I- N- N- N C)) Ln m V O N (n O S V O O O N6 N O m6 M in O h N- n O N M >. 5 C V Lor- coo .- N V O O n mo ,-- N CO 4c0 N CO 0) O N env O ti O O) o '3) CC C a m m m m O O O O O O O O . . . . . P 7 .7 7 N (N N N N N N N N M CL. *- N O CO co0 (00 C00 co0corcorcor (~0 Cr0 C�0 coNcorcn0 cn0 co� (�0 co� O coN (n0 coNco co~ conconcon (n0 (n0 (N0 c^O T (0 U N O 6) O m CA m m m m co O co., m O m co CA m m 6) 0) co co D1 CA co. O co co m O) m O Z LL) Ln U6 16 in LL) 1n LL) cc (n co l6 Ln Ln Lo Ln (n Lo (n lri 16 Iri (n to 16 1n Ln Ln Ln Ln Lo C)• a) a C c m rn _ O w d 0 , CO N CO O N V CO V 7 OD 7 M CO N V 00 N O 1) O CO V CO V r M CO N- CO m V CI- O .E U N d cc T N V V M O M V n V O m 7 N O O V m m 1` O M O r O 0? 0? 7 V m V V O 16 - N 4 co N- M O co co (n 5- CO O M O O O V CA N- O A O co O N O 0o (0 V o i 03 V O CO V m O n O M O CO V r CO N Ln O V N- O CO CO CO V U >� 0 O = LO O O O c0 O O O I-- N- N- O CO OD CO m m 0) CA 0 O O - .- .- N N N N CO CO 0 3 1- 2 z U) co 0 W '% t? 191ri (ri 1ri Ln ui tri (� Lri (� vi Lri vi t(i 1() ui (ci (n (o c c (Li c (o (o (o (c CV. (D (o 0 LC) O O N O 7 m N N r 0 CD O N- O O LO 10 CA CO O CO CO CO CO 7 7 O - I.-. V co co co O co n O r V O - N N- N CCI n O CO V co co co N CO CO (n O N- 6 6 0) V O N tO OV O m •- M O O m N M V r O m O O_ N M4 O O W O •- M V cor O O N M O O I-- CO m N M V O co r co co N co V0 O O) n) O) 6) n) O) Cn O O O O O O O O O N N N N N N z .z, •- + r O O co N- CO N- CO CO O D 10 0) CO N 0) N O CO rz V VM V n CO V O m L6 (N M O N CO m M V C0 s N CO 0) N M 0) CO 1- n O O 0) 7 O CO. CO CO O CO V V V O V O O U0 0) c0 O M O V N .- .- M LL) r O N M V V VLn N- O 0) 0 0 0 0 W - 6 O 0) O O r N- O O O 0 10 O (0 O O L0 O O O O 000300 co n ti N- N- O w 0 0 0) 0) 0) m 0) m m m m m m m m m 0) 6) 6) m m ( com m m m o) 0) rn m > v O O Mo L6 (n (n tri 1n 16 Ln tri tri Lri In tri LL) 6 to 1n (n 16 N O t cc tri to to co 16 Lei I- m O M r M r CO O CO (n 0 0) M N- 0) N O O 7 V V 7 CO V N- O V LO CO UO NI O N CO m M V CO N CO m N M 0) O n N- O 0 m 7 0 O m M N co V V V O O M co N N r O O 0 O O V M M O n m N V 16 O O O r m 0 7 N N N N ^, .- O O m m O O r r O O O O O O O N- r n r N. h ti h CO CO CO CO CO CO O O O O O O O 0 0 0 0 0 O O O O O C) O O O O 0 0 0 0 0 - I- `-- O C0 (O O O O O O O co' (O O O O O O O (O O CO CO O CO CO CO O CO (O t0 O O '07'3 N 9 = _ C m O O co O N C) I-- O m O O N CO CO O m 0 (0 N C` CO V N CO V N N CO • O CO CO V V n O n CO V V r M V N 0 O M V CO. O O M O 16 m O O m M O id @ m m m co C) O O N V V V V V V M N O m . {j' t'9 C1 y N . m m m m m m m m m m m m m m m m o) o) 0) 0) m m W m CO m m m CO m m 1 = > Q N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N w 0 7 7 Id .— 0 CO CO CO O O M V V V O N r S N O O CO 0) 1n N I- O O CO CO CO 0 0) CO 0) CO n N 1O C 0 N N N C CL 0- _ m V N N M .- C0 0) CO CO CO O V 0 .- N CO O V 00 (O O m co 1- O CO .- 0) co t O V V N N N C .- 0) co 0 0 0 0 0 0) CO CO 00) coMco0cco coOco co coVcco CO 0 co 000 co W 0co co00) 0 co CO G U Y Y N N N - V h. V M O N O (n O N V M O M m (N (6 O V c0 U) N O O O m 0 V V M (N N. V O co )` N N CO N O V M O m co co N N co V co co co V V N 1` O V O N CO V In N O T (6 N (6 LL) Ln LO UO L6 O O cn O Ln 0 cc) v) O LL) UC) N O O O O O O O L0 O Un Ln O) C .. .. 0 V 1- O CO CO m N U6 O 7 V I+ O CO O m N L6 CO V CO V N- 0 CO O 0) N (0 C as .... _ O C T 2 M M V V V V 0 0 0 0 0 O r r n co co. co, m 0) 0) 0 0 0 5 ' S s- N N 0 Q d 4 i CD CD 6) m m m m m m m m m m m m m m 0 0 0) m CO 0 0 0 0 0 0 0 0 0 ~O (. I Ep O U) d N- "in ) a v Ua (n330 a� �- op r co kill I MI m 0 i : M O O CI N CO 0 c CL Q Z 0 0 a) E Z a 0 0 o w t- > N N N N N N N N N N N N N N N N N W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 N 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 0 - co N co to O a) r coV co V N 0 CD C 0) r O r N V CO 0 u? O 0) 0 0 0 (NJ r r O 0 0 0 r r r 0 .- `- u) 6 ui 0 0 V CO ch M O ^0) N u) CO V r V r 0 01 ,-a0 V co N N ti_ U V u) u) 0 0 CO CO N- r r CO CO CO 0 0) 0) 0) 0 N N (D N N 0 (o (o (o (O (O (o (O (D (o (0 (o (o (o (o (D (D N > > w -0 0 C) O ^. 0 N M 0 CO ',- 0) " CO (Cl CO V N 0 0) N- 0 co O to> d O r CO 0 0 cO N 7 N 0) ..- 0 0 N N CO O N N N J O (V `- (V — u) 6 r- C0 a) V O or c0 1` V O co UI Q 0 CO r 1D 0 O 0 V 0) CO N CO N CO N 0 V 4- CV N N N P - u) CO V N r V CO N V 0 N N V CO N CO 0) V N N N LY c 0 0) ai .- of u) co 00 0 r Co ai a) coC ` r 6 a '— ('i v of cv N NF- W Q 00) N- co 0 co ') • 0 u) N 0 r CO 0 0 CO. COCO. r r r r CO0 0 0 0 u) 0 _ ' N N N N N N N N N N N N N N N N N N N w lNC) cv 1N LL N N 0 1(j N UN 1N 07 0 1Cs1 CV NO 10 1CV N 10 1N t N N0- c o O _ 0. a) d •.0 O V r 04 0 CO r V 0 V 0 O co V a0 co w m CO N u) 0 V N N 0 P ,- N. u) 0 CO CO CO a) 0) O. 1O (a u) 0 u) V7 0 u) M N 4) r 0 0 V 0 r 2 C — N C') V co to r a0 0) co (NI (0 V u) 0 r (3) Ce C Q"- co co cOco cO co co co cO V4 V V V 7 V V V Y. ? a) O R w r r n rs n r r 1: 1• r. r- r r r r .. co• '� 0 u co a) 0 6)- 00)_ 00)_ co coO- 00)rn a0)- a0) 0) Co a0)- 0 CO 00) 00) (,� . (.1 0 C Z l() u) u1 u7 u) UD Uriu) u7 u1 6' 6666 u) in U N 0 c 0 O > o` d d '� m C a •'^' 0 a1 0 0 y M 0 0 r aO <F CO M u) 0) 1D 0) 0 O C') N 0) O O c U cc T CS V u) M 0 O cO CO V CO CO N .- CO N CO V 0) O (C R W C a) .0 ? N O 00 (O u) (+) V CO 0 V C7 ,- O a) CO co (Q >^ 0- 0 N u) CO V h 0 CO (D 00 V N- 0) C') CO A O > co <r V V 7 1D 10 10 (O (O (O (O n 1.- n 1.- CO CO LJ J I- 2 Z (n 0 w - (D (Q (o (o (o (c." (o (o ui ui ui (o (a (fl ui (D (o (o CO N CT CO N N CO u) V a0 a) u) u) 0 r co V r o) O) CO 0) 7 _ N. M V 0 (0 r V x co 0 0 0 0 0 6 a) r 0 co N O 6 N C9 r 0 a) 0 7 N CO u) u) 0 r 0 a) O co 'V = N N CVCO. COCIM COC', CO M M COV V V V V + O N CO V CO V V V 0) Co-) N r Cl 10 0 0) (O u) 0 u) V V O 0 Cc) CO V 0 N (D 0 0) 0 N 0 N CO V 0 V V V co r co 0 r u) CO 6 u) -- r r r r r r r r r r N. r r r r co co 0 0 - 0) 0) O) a) a 0 0 0) am a) a) am 0) m rn O) op am > " 1)) 1D U) UD U) Uri u) 1a u) u) u) co u) U) 6 u) u) 6 F O N CD V CO V V V 0) M N r N u) 0 0) 0 u) CD u) V V 0 0 CO CO V 0 N CO 0) 0) .- CO N 0 M V u) 0 r 0 0 0 h O O O 0) r u) r (') Ci 0^ 0 0 0 0 co 0 0 0 0 0 0) 0) 0 0 0 0 r r C >1L-!, 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 '---.I•' -. 0 0 (o (o Co CO 0 0 0 0 0 co to (o 0 0 0 0 Co N a3 = ConocoPhillips Time Log & Summary W'ellwew Web Reporting Report Well Name: 2Z-23 Rig Name: NABORS CDR2-AC Job Type: DRILLING SIDETRACK Rig Accept: 12/3/2010 6:00:00 PM Rig Release: 12/28/2010 12:00:00 AM Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12/02/2010 24 hr Summary Arrived @ 2Z-23 @ 16:00 MIRU 06:00 16:00 10.00 MIRU MOVE MOB P Move CDR 2 from 3-k to 2Z Pad 16:00 00:00 8.00 MIRU MOVE MOB P Arrive on 2Z Pad,Spot drilling sub and mud pits.MIRU 12/03/2010 Rig maintenance,Change skates. Start testing BOP equipment. State witness waived by Chuck Scheve. 00:00 05:00 5.00 0 0 MIRU MOVE MOB P Continue to rig up 05:00 15:30 10.50 0 0 MIRU RIGMNT RGRP P Unstab coil, R&R Injector skates 15:30 16:00 0.50 0 0 MIRU RIGMNT RGRP P Injector complete, R/U to install pipe in injector 16:00 18:00 2.00 0 0 MIRU RIGMNT RGRP P PJSM to stab pipe 18:00 00:00 6.00 0 0 MIRU WHDBO BOPE P Test BOP equipment.State witness waived by Chuck Scheve elor Rig Accept 18:00 12/04/2010 Complete testing BOP, perform slack management, MU BHA and mill cement from 7387 to 7470' 00:00 06:00 6.00 0 0 MIRU WHDBO BOPE P Continue testing BOP equipment 06:00 09:00 3.00 0 0 MIRU WHDBO BOPE P PJSM, Pull BPV, R/D BPV lubricator and load out 09:00 09:30 0.50 0 0 MIRU WHDBO BOPE P Pressure test PDL 09:30 12:00 2.50 0 0 MIRU WELLPF SLPC P Seal end of a-line,stab on injector, Fill coil, perform slack mgmt PT and chart inner reel valve. 12:00 13:00 1.00 0 0 MIRU WELLPF SLPC P Cut 11 feet coil, Install CTC connector and pull test to 35K 13:00 14:42 1.70 0 0 MIRU WELLPF SLPC P Baker tested E-Line, Head up upper quick connect PT Coil connector to 4K, stab on well and verify no pressure 14:42 15:36 0.90 0 0 SURPRI WELLPF MILL P PJSM, P/U BHA#1Cement milling 0 degree motor and turned down Bi Center, Surface test tool 15:36 16:42 1.10 0 0 SURPRI WELLPF MILL T No surface test. Unstab and trouble shoot 16:42 16:54 0.20 0 0 SURPRI WELLPF MILL P Surface test tool. Problem traced to wire connector in PUTZ corridor, Open EDC, Set counters 16:54 18:54 2.00 0 7,387 SURPRI WELLPF MILL P Trip in well,displace FP diesel to TT with SW,Tie in to K1 at 7274', +2' correction. Page 1 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 18:54 00:00 5.10 7,387 7,470 SURPRI WELLPF MILL P Start used flo-pro for milling operations,dry tag cement at 7387'. Strt pumping at 1.4 BPM, 3200 CTP, 390 down hole differential pressure. Start milling cement, numerous stalls, -20 FPH while milling 12/05/2010 Milled cement to 7500', milled two string window 00:00 02:00 2.00 7,470 7,500 SURPRI WELLPF MILL P Continue milling 02:00 04:00 2.00 7,500 0 SURPRI WELLPF MILL P POOH 04:00 04:30 0.50 0 0 SURPRI WELLPF MILL P Lay down cement milling BHA 04:30 05:00 0.50 0 0 PROD1 WHPST PULD P MU window milling BHA DSM is 2.80"go/2.79'no-go String Reamer is 2.79"go/2.78" no-go 05:00 06:45 1.75 0 7,295 PROD1 WHPST TRIP P RIH 06:45 06:51 0.10 7,295 7,314 PROD1 WHPST DLOG P Log K-1, +.5' 06:51 08:21 1.50 7,314 7,502 PROD1 WHPST TRIP P RIH to tag TOC,Stack out @ 7404 dry, Pumps on,stacked out @ 7412, Start working to bottom. mill cement to top of whipstock 08:21 14:57 6.60 7,502 7,508 PROD1 WHPST MILL P Call pinch point @ 7502,Start time milling 14:57 16:42 1.75 7,508 78 PROD1 WHPST TRIP P Made 6'past pinch point.Good metal filings on ditch magnets. POOH for 2 degree motor 16:42 18:42 2.00 78 74 PROD1 WHPST PULD P At Surface, PJSM while flow checking well for flow. LD BHA#2,Mill still 2.80", string reamer is still 2.79" PU BHA#3 with 2 deg fixed Weatherford motor and fat radius window mill at 2.80"go/2.79"no-go 18:42 20:12 1.50 74 7,295 PROD1 WHPST TRIP P RIH with EDC closed and pumping .25 BPM 20:12 20:24 0.20 7,295 7,507 PROD1 WHPST DLOG P Tie-in, +.5' 20:24 00:00 3.60 7,507 7,509 PROD1 WHPST MILL P 1.4 BPM, 3640 CTP, 780 free spin differential pressure at the BHA, Start time milling,frnm 75n7' 12/06/2010 Completed milling window,TOWS at 7500', RA marker at 7506', BOW at 7507. Drill build to land at 8120' 00:00 03:12 3.20 7,509 7,513 PROD1 WHPST MILL P Continue milling window,WOB dropped off at 7509.5'. Continue time �/-L i5 milling at 1 FPH 1 ►l 03:12 04:36 1.40 7,513 7,520 PROD1 WHPST MILL P Drill ahead at-5 FPH, 2K WOB, 3800 CTP 04:36 06:00 1.40 7,520 7,520 PROD1 WHPST REAM P Ream window, Up at 15, 330,60. Down at 15 deg. Dry Drift was clean d1-2.3 A 06:00 08:06 2.10 7,520 80 PROD1 WHPST TRIP P Trip out of well Page 2 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 08:06 08:36 0.50 80 0 PROD1 WHPST PULD P At surface, PJSM monitor well, lay down window milling BHA Mill 2.79 NoGo 08:36 09:12 0.60 0 62 PROD1 DRILL PULD P M/U BHA#4 "A"Lateral build 2.3 degree motor, Surface test tool 09:12 10:48 1.60 62 7,285 PROD1 DRILL TRIP P Trip in well 10:48 11:00 0.20 7,285 7,301 PROD1 DRILL DLOG P Tie in fora+.5'correction Close EDC 11:00 11:12 0.20 7,301 7,520 PROD1 DRILL TRIP P RIH to drill,Clean pass through window 11:12 13:48 2.60 7,520 7,670 PROD1 DRILL DRLG P 7520', Drill ahead 1.44 BPM @ 3420 PSI FS Start New Mud down Coil 13:48 14:42 0.90 7,670 7,670 PROD1 DRILL WPRT P Wiper to window, Log RA Marker @ 7506.25 Pull up and log K1 for no correction TOW=7500.2, BOW=7508 RBIH to drill 14:42 17:24 2.70 7,670 7,820 PROD1 DRILL DRLG P 7670' Drill Ahead 1.41 BPM @ 3626PSI FS BHP=3866 17:24 18:06 0.70 7,820 7,820 PROD1 DRILL WPRT P Wiper to window, 31K PUW, 14K RIW 18:06 20:06 2.00 7,820 7,970 PROD1 DRILL DRLG P Continue drilling ahead, 1.3 BPM, 3600 CTP, 3780 BHP with WOC 20:06 20:54 0.80 7,970 7,970 PROD1 DRILL WPRT P Wiper to window, 30K PUW, 14K RIW 20:54 00:00 3.10 7,970 8,110 PROD1 DRILL DRLG P Continue drilling ahead, 1.3 BPM, 3600 CTP, 3780 BHP with WOC 12/07/2010 Drilled"A"lateral to 8572' 00:00 00:12 0.20 8,110 8,120 PROD1 DRILL DRLG P Continue drilling ahead, 1.3 BPM, 3600 CTP, 3780 BHP with WOC 00:12 02:36 2.40 8,120 0 PROD1 DRILL TRIP P POOH, open EDC when above window 02:36 04:06 1.50 0 0 PROD1 DRILL PULD P Undeploy BHA 4 04:06 06:24 2.30 0 68 PROD1 DRILL PULD P Deploy BHA#5, Lateral Rib Steer w/ Bi-Center Surface test 06:24 08:00 1.60 68 7,290 PROD1 DRILL TRIP P Trip in well 08:00 08:12 0.20 7,290 7,308 PROD1 DRILL DLOG P Tie in for a-1'correction, Close EDC PUW=27K 08:12 08:42 0.50 7,308 8,120 PROD1 DRILL TRIP P Trip in hole,Clean pass through window 08:42 13:12 4.50 8,120 8,270 PROD1 DRILL DRLG P 8120', Drill Ahead, 1.4 BPM @ 3600 FS BHP=3878 Slow drilling 8140 to 8181, <10 FPH 13:12 16:00 2.80 8,270 8,270 PROD1 DRILL WPRT P Wiper to window with MADD pass from 8135 to 7523 PUW=28K 16:00 18:18 2.30 8,270 8,420 PROD1 DRILL DRLG P 8270', Drill Ahead 1.37 BPM @ 3060 PSI FS BHP=3883, RIW=12.6K Page 3 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 18:18 19:30 1.20 8,420 8,420 PROD1 DRILL WPRT P Wiper trip to window,29K PUW, 16K RIW,clean trip 19:30 22:24 2.90 8,420 8,570 PROD1 DRILL DRLG P Continue drilling ahead, 1.4 BPM, 3600 CTP, 3857 BHP with WOC, 14K RIW 22:24 23:12 0.80 8,570 7,520 PROD1 DRILL WPRT P Wiper to window,29K PUW 23:12 23:24 0.20 7,520 7,550 PROD1 DRILL DLOG P Tie-in,-3' 23:24 23:54 0.50 7,550 8,570 PROD1 DRILL WPRT P Wiper back in hole 23:54 00:00 0.10 8,570 8,572 PROD1 DRILL DRLG P Continue drilling ahead, 1.4 BPM, 3600 CTP, 3875 BHP with WOC, 14K RIW 12/08/2010 Drilled"A"lateral to 9190' 00:00 04:30 4.50 8,572 8,720 PROD1 DRILL DRLG P Continue drilling ahead, 1.4 BPM, 3600 CTP,3880 BHP, 14K RIW 04:30 06:00 1.50 8,720 8,720 PROD1 DRILL WPRT P Wiper trip to window,30K PUW 06:00 10:45 4.75 8,720 8,870 PROD1 DRILL DRLG P 8720', Drill Ahead 1.33 BPM @ 3250 FS RIW=15K, BHP=3954 10:45 12:15 1.50 8,870 8,870 PROD1 DRILL WPRT P 8870 Wipe to window, PUW=31k 12:15 15:30 3.25 8,870 9,020 PROD1 DRILL DRLG P 8870', Drill Ahead 1.38 BPM @ 3380 PSI FS RIW=11.7K, BHP=4000,WOC 15:30 17:24 1.90 9,020 9,020 PROD1 DRILL WPRT P 9020',Wipe to window with Tie into RA for a+1 foot correction PUW=31K 17:24 21:06 3.70 9,020 9,170 PROD1 DRILL DRLG P Continue drilling, 1.34 BPM, 3600 CTP,4000 BHP, 10K RIW 21:06 23:18 2.20 9,170 9,170 PROD1 DRILL WPRT P Wiper to window,29K PUW, 14K RIW 23:18 00:00 0.70 9,170 9,190 PROD1 DRILL DRLG P Drilling ahead, 1.35 BPM, 3750 CTP, 4050 BHP, 10K RIW 12/09/2010 Drilled"A"lateral to 9722' 00:00 05:18 5.30 9,190 9,320 PROD1 DRILL DRLG P Drilling ahead, 1.35 BPM,3750 CTP, 4050 BHP, 10K RIW Mud swap 05:18 07:48 2.50 9,320 9,320 PROD1 DRILL WPRT P Wiper to window PUW=32K, BHP=3922 07:48 11:36 3.80 9,320 9,393 PROD1 DRILL DRLG P 9320', Drill Ahead 1.39 BPM @ 3340 PSI FS BHP=3895 11:36 13:48 2.20 9,393 9,470 PROD1 DRILL DRLG P Pump to hi vis sweep, Hi vis with drill zone No marked difference in ROP 13:48 16:18 2.50 9,470 9,470 PROD1 DRILL WPRT P Wiper trip to window, PUW=33K Tie into RA marker for a-1'correction Clean trip in and out 16:18 19:06 2.80 9,470 9,620 PROD1 DRILL DRLG P 9470, Drill ahead 1.4 BPM @ 3450 PSI FS BHP=3930 19:06 21:42 2.60 9,620 9,620 PROD1 DRILL WPRT P Wiper trip to window, 32K PUW, 14K RIW 21:42 00:00 2.30 9,620 9,722 PROD1 DRILL DRLG P Continue drilling ahead, 1.4 BPM, 3600 CTP, 3940 BHP, 9K RIW Page 4 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12/10/2010 24 hr Summary Drilled"A"lateral to 10380' 00:00 01:24 1.40 9,722 9,770 PROD1 DRILL DRLG P Continue drilling ahead, 1.4 BPM, 3600 CTP,3940 BHP,9K RIW 01:24 04:12 2.80 9,770 9,770 PROD1 DRILL WPRT P Wiper to window, 31K PUW, 14K RIW Clean trip 04:12 06:42 2.50 9,770 9,927 PROD1 DRILL DRLG P Continue drilling ahead, 1.4 BPM, 3700 CTP, 3980 BHP, 10K RIW 06:42 09:42 3.00 9,927 9,927 PROD1 DRILL WPRT P 9927',Wipe to window with tie in for -2'correction PUW=32K 09:42 11:48 2.10 9,927 10,074 PROD1 DRILL DRLG P 9927', Drill ahead 1.39 BPM @ 3650' FS RIW=8K,WOB=1.7K, BHP=4029 11:48 14:48 3.00 10,074 10,074 PROD1 DRILL WPRT P wiper to window, PUW=29K 14:48 16:48 2.00 10,074 10,230 PROD1 DRILL DRLG P 10074', Drill Ahead 1.37 BPM @ 3600 PSI FS RIW=7K,WOB-1.5K, BHP=4040 16:48 20:06 3.30 10,230 10,230 PROD1 DRILL WPRT P 10230',wipe to window, PUW=29K 20:06 22:06 2.00 10,230 10,380 PROD1 DRILL DRLG P Continue drilling ahead, 1.4 BPM, 3700 CTP,4060 BHP,8K RIW 22:06 23:54 1.80 10,380 7,525 PROD1 DRILL WPRT P Wiper to window, 31K PUW 23:54 00:00 0.10 7,525 7,560 PROD1 DRILL DLOG P Tie-in,-3' 12/11/2010 Drilled"A"lateral to TD at 10810',condition hole / 00:00 01:30 1.50 7,560 10,380 PROD1 DRILL WPRT P Wiper trip in hole,start mud swap while RIH. 14K RIW at window, down to 2-4K RIW at bottom 01:30 04:00 2.50 10,380 10,497 PROD1 DRILL DRLG P Drilling ahead, 1.4 BPM,3500 CTP, 3990 BHP with 50 WHP. Able to drill ahead at 4-8K surface weight with 1-2K WOB At 10496 started to stack weight, 100'wiper did not improve situation 04:00 07:30 3.50 10,497 10,497 PROD1 DRILL WPRT P Wiper to window,34K PUW 07:30 11:45 4.25 10,497 10,650 PROD1 DRILL DRLG P 10497', Drill Ahead,Got back to hard spot able to get 3k DHWOB @-1 K surface weight 1.38 BPM @ 3350 PSI FS BHP=3962, Broke through @ 10,528 11:45 15:30 3.75 10,650 10,650 PROD1 DRILL WPRT P Wiper to window PUW=31 K Clean trip in and out. Little motor work @ 10525 going down RIW=4k 200'from bottom 15:30 18:12 2.70 10,650 10,775 PROD1 DRILL DRLG P 10650', Drill Ahead 1.4 BPM @ 3500 PSI FS RIW=-1.3 w/2.4K WOB, ROP=50 FPH Page 5 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 18:12 19:18 1.10 10,775 10,810 PROD1 DRILL DRLG P Stacking weight, pulled up hole to 10500', ran back in and able to drill ahead,-2K sufrace weight, 1 -2K WOB,with 200-300 motor work. 1.4 BPM,3550 CTP,4000 BHP 19:18 23:30 4.20 10,810 80 PROD1 DRILL WPRT P Pump Low/High vs sweeps and POOH for a wiper trip to the swab valve 23:30 00:00 0.50 80 2,500 PROD1 DRILL WPRT P RBIH 12/12/2010 Finished hole conditioning run and circulate well to 12.0 PPG KWF. Run lower liner section to TD at 10810. 00:00 01:00 1.00 2,500 7,250 PROD1 DRILL WPRT P Continue RIH for wiper to swab 01:00 01:12 0.20 7,250 7,300 PROD1 DRILL DLOG P Tie-in,-6' 01:12 03:12 2.00 7,300 10,810 PROD1 DRILL WPRT P Continue RIH 03:12 07:06 3.90 10,810 78 PROD1 DRILL TRIP P Taq TD at 10810', lay in 12.0 ppg liner running pill to wiindow then 12.0 ppg KWF while POOH 07:06 07:18 0.20 78 78 PROD1 DRILL SFTY P At surface, PJSM to lay down laterl drilling BHA#5 Monitor well for flow 07:18 08:18 1.00 78 0 PROD1 DRILL PULD P Lay down lateral drilling BHA#5 08:18 08:54 0.60 0 0 PROD1 DRILL BOPE P Function test BOPE 3 P 08:54 09:30 0.60 0 0 COMPZ CASING SFTY P R/U floor to run"A"lateral Liner, PJSM 09:30 12:30 3.00 0 0 COMPZ CASING PUTB P M/U"Eller"Guide shoe,72 Joints 2 3/8 Tubing For"A"lateral liner Perform BOPE Drill.good drill all hands responded properly 12:30 13:30 1.00 0 0 COMPZ CASING PUTB P Liner in well, M/U Coil track to liner While making up quickconnect a connection above slips below quick connect un tourqued. Undo quick connect and slide injector cart out of the way 13:30 15:00 1.50 0 0 COMPZ CASING PULD T Put lift nubbin on top of coiltrack. Latch up elevators. Bring elevators up to contact nubbin before opening slips Over pulled with top drive.Toolstring slipped up through deployment rams damaging EDC. Break down coiltrack replace EDC One and one half hours Nabors billable rig repair time 15:00 15:30 0.50 0 2,408 COMPZ CASING PULD P Stab injector onto coil track. Surface test 15:30 16:45 1.25 2,408 7,403 COMPZ CASING RUNL P RIH with lower section lateral"A" slotted liner Page 6 of 20 S Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 16:45 18:18 1.55 7,403 10,810 COMPZ CASING RUNL P Correct to flag,+5 correction PUW=31 K,Continue in hole 18:18 19:18 1.00 10,810 7,250 COMPZ CASING RUNL P Taq TD at 10814', Confirmed weights, 44K PUW,-3K WOB,8K RIW, 3K WOB. Pumped off liner with 1.2 BPM,4000 PSI, 28K PUW,+1K WOB. POOH 19:18 21:06 1.80 7,250 0 COMPZ CASING PUTB P Tie in to K1 and correct depth,-2'. Continue POOH 21:06 21:18 0.20 0 0 COMPZ CASING SFTY P PJSM while checking well for no-flow 21:18 22:00 0.70 0 0 COMPZ CASING PUTB P Lay down inteq tools 22:00 00:00 2.00 0 0 COMPZ CASING BOPE T Blow down stack, changeout 2 3/8" li deployment Rams *****1.5 hours Nabors billable rig repair time***** 12/13/2010 Ran upper liner with anchored aluminum billet in"A"lateral at 7903'. Kicked off billet and drilled"ALl"lateral to 8070'and tripped for lateral drilling assembly with resistivity and RSM 00:00 02:30 2.50 0 0 COMPZ CASING RGRP T Change out 2 3/8"Pipe/Slip rams to check for any damage due to pulling BHA into them. Tested rams to 200/3500 psi charted. ****4.5 hours Nabors billable rig repair time*** 02:30 02:48 0.30 0 0 COMPZ CASING SFTY P PJSM for PU liner 02:48 04:48 2.00 0 606 COMPZ CASING PUTB P PU 16 Joints slotted liner, pup joint, anchored billet, 543.56'. MU Inteq tools. 04:48 06:33 1.75 606 7,403 COMPZ CASING RUNL P RIH, BHA#7"A"Liner upper section 06:33 07:03 0.50 7,403 8,447 COMPZ CASING RUNL P Correct+2.8 @ EOP Flag, Close EDC PUW=30K,Continue in hole 07:03 07:15 0.20 8,447 8,447 COMPZ CASING RUNL P Taq Lower deployment sleeve,Set anchor @ 150 Left Pump and set anchor on upper section of liner BOL=8445',TOL=7902, overall BOL=10810 07:15 09:15 2.00 8,447 65 COMPZ CASING TRIP P Trip out of well after setting liner 09:15 10:00 0.75 65 0 COMPZ CASING PULD P Lay down Liner running tools, BHA#7 10:00 11:00 1.00 0 62 PROD2 STK PULD P P/U Drill by(Al Build) BHA#8. 1.1 degree bent motor Bi Center Bit. Install new database for this lateral 11:00 12:30 1.50 62 7,289 PROD2 STK TRIP P RIH, EDC closed 12:30 12:42 0.20 7,289 7,305 PROD2 STK DLOG P Tie in fora+2'correction OPen EDC to circulate out KWF Page 7 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12:42 14:42 2.00 7,305 7,446 PROD2 STK CIRC P RIH just above window Pump Spacer /9.6 PPG Flo Pro Started out.5BPM In-.3 Out Started with 205 BBIs recovered 186 BBIs 12Lb 14:42 15:06 0.40 7,446 7,903 PROD2 STK TRIP P Close EDC,Trip in hole,Clean pass through window 7903.1 Dry tag TOB _ 15:06 17:00 1.90 7,903 7,912 PROD2 STK KOST P Pumps on 1.33 BPM @ 3630 PSI FS Start time milling 105L TF 17:00 19:18 2.30 7,912 8,070 PROD2 DRILL DRLG P Milled 10'per procedure. Drill ahead 1.35 BPM @ 3430 PSI FS RIW=12.2 DHWOB=1.2K BHP=3780 Billet dry drift was clean 19:18 21:30 2.20 8,070 0 PROD2 DRILL TRIP P POOH for lateral drilling assembly with resistivity and RSM 21:30 00:00 2.50 0 0 PROD2 DRILL PULD P Undeploy BHA#8, Deploy BHA#9 12/14/2010 Drill AL1 Lateral 8070'-8240'with BHA data issues,possible magnetic activity. POOH, swap complete BHA. Drill ahead 8240'-8390'with continued BHA issues,magnetic interference. Continue drilling conservative adjusting Azm.toolface to IFR report. 1-2deg survey adjustments. Q 00:00 01:30 1.50 0 68 PROD2 DRILL PULD P Continue with pressure deploy drilling /1'0X3q BHA 1 01:30 03:06 1.60 68 7,290 PROD2 DRILL TRIP P RIH with lateral drilling BHA with resistivity and RSM 03:06 03:18 0.20 7,290 7,308 PROD2 DRILL ,DLOG P Tie-in, +1' Close EDC 03:18 03:48 0.50 7,308 8,070 PROD2 DRILL TRIP P Continue RIH 03:48 04:12 0.40 8,070 8,113 PROD2 DRILL DRLG P Drill ahead, 1.4 BPM, 3500 CTP, 3890 BHP, 14.5K RIW 04:12 05:48 1.60 8,113 8,113 PROD2 DRILL DLOG P Perform MAD pass while trouble shooting survey problem. RBIH. 05:48 06:18 0.50 8,113 8,157 PROD2 DRILL DRLG P Drill ahead, 1.4 BPM, 3495 CTP, 3840 BHP, 10K RIW 06:18 06:30 0.20 8,157 8,157 PROD2 DRILL DLOG P Survey wiper. 06:30 07:15 0.75 8,157 8,220 PROD2 DRILL DRLG P Drill ahead, 1.4 BPM, 3575 CTP, 3870 BHP, 10K RIW 07:15 09:45 2.50 8,220 8,220 PROD2 DRILL WPRT P Wiper trip to window#1. 09:45 10:15 0.50 8,220 8,240 PROD2 DRILL DRLG P Drill ahead, 1.4 BPM, 3575 CTP, 3870 BHP, 10K RIW. Survey not cleaning up. 10:15 13:15 3.00 8,240 71 PROD2 DRILL TRIP P PUH slow. DD evaluating survey data. Discussions with Geo, BHI, and town. POOH to swap toolstring. 13:15 14:45 1.50 71 0 PROD2 DRILL PULD P PJSM-Undeploy BHA#9 14:45 17:15 2.50 0 68 PROD2 DRILL PULD P Deploy BHA#10 with 2.73"&RSM 17:15 18:45 1.50 800 7,290 PROD2 DRILL TRIP P RIH-close EDC-RIH 18:45 19:00 0.25 7,290 7,300 PROD2 DRILL DLOG P Tie in depth, 0 correection 19:00 20:42 1.70 8,240 8,340 PROD2 DRILL DRLG P Drill Ahead 100-120 FPH, 1.4BPM in, 1.4 BPM out, 3500 CTP 3905 BHP, 11K CTW,2 K WOB, Page 8 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 20:42 21:57 1.25 8,340 7,520 PROD2 DRILL DLOG P PUH 28K, Experiencing magnetic interference, MADD pass 8250-7520'. 7-8 FPM. 21:57 22:39 0.70 7,520 8,340 PROD2 DRILL DLOG P RIH to drill, Request IFR report from Sperry. 22:39 23:39 1.00 8,340 8,390 PROD2 DRILL DRLG P Drill Ahead 50-60 FPH, 1.4BPM in, 1.4 BPM out, 3550 CTP 3895 BHP, 12K CTW, 1K WOB, 23:39 00:00 0.35 8,390 8,390 PROD2 DRILL WPRT P Wiper trip to correct survey data 12/15/2010 Drill AL1 Lateral 8390'-8995'. Pinhole Coil Tubing during wiper trip. POOH. RD CT reel for reel swap. 00:00 01:30 1.50 8,390 8,390 PROD2 DRILL WPRT P Continue wiper trip 01:30 05:00 3.50 8,390 8,545 PROD2 DRILL DRLG P Drill Ahead 30-60 FPH Holding back ROP for TF drop, 1.4 BPM in and out.3471 CTP, 1-1.5K WOB, 3900 BHP, 11K CTW. Start sending new mud down CT,for mud swap, 330am New mud to surface 0430am 05:00 06:00 1.00 8,545 8,545 PROD2 DRILL WPRT P Wiper trip to window 06:00 08:30 2.50 8,545 8,695 PROD2 DRILL DRLG P Drilling ahead-short survey's looking cleaner.Ankerite @ 8550' 08:30 10:00 1.50 8,695 8,695 PROD2 DRILL WPRT P Wiper trip. P/U weight 28K 10:00 11:30 1.50 8,695 8,845 PROD2 DRILL DRLG P Drilling ahead-1.40 BPM, 3500 psi, BHP 3900, ROP 100,WHP 0,WOB 1.8K,CT weight 11 k 11:30 13:00 1.50 8,845 8,845 PROD2 DRILL WPRT P Wiper trip-27K.Samples-good A-4 sand samples with heavy oil. 13:00 14:30 1.50 8,845 8,940 PROD2 DRILL DRLG P Drilling ahead-1.43 bpm,3400psi, BHP 3867, ROP 90, ECD 12.5,CT weight 10K,WOB 1.6K. 14:30 15:00 0.50 8,940 8,995 PROD2 DRILL DRLG P Pull BHA wiper due to weight transfer. P/U weight 27K. Continue drilling ahead-1.42 bpm, 3200, BHP 3860, ECD 12.4,WOB 1.4,CT weight 9K, ROP 110 15:00 15:36 0.60 8,995 8,165 PROD2 DRILL WPRT P Wiper trip-P/U weight 27K, 15:36 16:21 0.75 8,165 8,165 PROD2 DRILL CTOP T Pinhole CT string,. Stop pumping, spraying inside injector chain. Leak stopped.Check valves holding.Shut in well. PJSM for pulling pipe from injector.Set up MPD line to hold pressure on well. Install additional containment outside under reel sump. 16:21 18:21 2.00 8,165 0 PROD2 DRILL TRIP T POOH slowly and watch pinhole through camera on reel. Flag pinhole, POOH pumping down MPD. CT life @ 31%coil life, pinhole-not injector damage. 18:21 18:36 0.25 0 0 PROD2 DRILL SFTY T PJSM Undeploy BHA 18:36 20:36 2.00 0 0 PROD2 DRILL PULD T Undeploy Page 9 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12/15/2010 24 hr Summary Drill AL1 Lateral 8390'-8995'. Pinhole Coil Tubing during wiper trip. POOH. RD CT reel for reel swap. 20:36 21:36 1.00 0 0 PROD2 DRILL CTOP T Flush stack 21:36 21:51 0.25 0 0 PROD2 DRILL CTOP T Blow down CT 21:51 00:00 2.15 0 0 PROD2 DRILL CTOP T Prepare to unstab CT 12/16/2010 Swan out reels. RU/MU reel. 00:00 01:00 1.00 0 0 PROD2 DRILL CTOP T Prepare to unstab CT 01:00 03:00 2.00 0 0 PROD2 DRILL CTOP T Unstab CT and secure to drum 03:00 06:00 3.00 0 0 PROD2 DRILL CTOP T RD reel-lower onto truck 06:00 11:00 5.00 0 0 PROD2 DRILL CTOP T switch flanges on reels&spot truck up to Sub module(tight fit due to hi-line power stand and edge of pad. 11:00 13:00 2.00 0 0 PROD2 DRILL CTOP T Install new Reel into stand. 13:00 17:00 4.00 0 0 PROD2 DRILL CTOP T Inspect injector&stripper prior to stabbing or moving pipe. New CT string thawing out. 17:00 19:00 2.00 0 0 PROD2 DRILL CTOP T Begin stabbing pipe.**5 bbls injected past 12 hours** 19:00 20:00 1.00 0 0 PROD2 DRILL CTOP T RD stabbing device 20:00 21:00 1.00 0 0 PROD2 DRILL CTOP T MU inside reel iron 21:00 00:00 3.00 0 0 PROD2 DRILL CTOP T Cut inner brace to MU stand pipe to reel swival. Fabricate clamp for stand pipe to swival. 12/17/2010 Complete reel swap, Complete Bi-weekly BOP test. Pump slack management, Cut 2'CT finding E-line, MU CTC and drilling head. Pressure and pull test. Deploy BHA 11. Surface test did not pass on electronics. Rewire pressure bulk head,surface test, pressure test.(Pass). Complete deployment BHA 11. RIH 00:00 02:00 2.00 0 0 PROD2 DRILL CTOP T Cont.working on reel, rigging up stand pipe from reel swival to ineer reel iron. 02:00 06:00 4.00 0 0 PROD2 WHDBO BOPE P Start BOP testing-***State Witness waived by John Crisp***. Begin making up inner reel iron and RO build pressure bulk head. 1r� 06:00 09:30 3.50 0 0 PROD2 WHDBO BOPE P Completed Bulk head-Mig line. Completed with BOP test other than inner reel iron.Zero failures. BOP testing complete 09:30 12:00 2.50 0 0 PROD2 DRILL CIRC P Start filling reel for slack management&pressure test inner reel iron. Inner reel iron leaked. Stopped to hammer up. Re-test. 12:00 13:30 1.50 0 0 PROD2 DRILL CIRC P Pump Mud into CT, pop off well&cut back pipe. 13:30 15:00 1.50 0 0 PROD2 DRILL CTOP P Re-head CT string. Pull&pressure test. 15:00 17:15 2.25 0 68 PROD2 DRILL PULD P PJSM-start P/U and deploying new BHA. Page 10 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 17:15 18:00 0.75 68 68 PROD2 DRILL ELOG T Electronic's failed surface test, Lift injector off well. Postion reel to diagnose short. 18:00 00:00 6.00 68 68 PROD2'DRILL ELOG T Re-wire pressure bulk head, and swap out flow tube in BHA drilling head. Surface test, Pressure test, Good. 12/18/2010 RIH BHA 11, Drill AL1 lateral 8995-9167'. Perform MADD pass 9120-7834'. Inner reel iron leak during drilling operations. POOH to repair. 00:00 01:00 1.00 68 68 PROD2 DRILL PULD P Complete deploying BHA 11 01:00 03:00 2.00 68 7,290 PROD2 DRILL TRIP P RIH 03:00 03:06 0.10 7,280 7,280 PROD2 DRILL DLOG P Tie in depth, +2'correction 03:06 03:21 0.25 7,280 7,880 PROD2 DRILL TRIP P RIH to drill 03:21 04:21 1.00 7,880 7,880 PROD2 DRILL WPRT P Wiper trip back to window from top of billet 04:21 06:51 2.50 8,995 9,145 PROD2 DRILL DRLG P Drill Ahead 1.4 BPM in/out, 1-2K WOB,70-120FPH, 11-12K CTW, 3888 CTP,4000BHP, 06:51 07:21 0.50 9,145 9,018 PROD2 DRILL WPRT P Wiper trip-pick up weight 34 K. Weight increased to 41K @ 9020' Cycle pipe to try and clean up. Good returns but annular climbing. movement from 9025'to 9016'.WOB indicates pipe stuck, not BHA. max. P/U 55K. Heavy cuttings coming over shaker. 07:21 08:06 0.75 9,018 9,120 PROD2 DRILL WPRT T Pump 7 bbls low/High sweeps. Slowly move pipe while pumping 1.40 bpm, returns 1.34 bpm. Increase pump rate to 1.55 bpm, 60 fpm speed. Broke through while RIH on 6th attempt. RIH to 9120' 08:06 10:06 2.00 9,120 9,020 PROD2 DRILL WPRT P P/U weight 29K.Wiper trip to window. Heavy cutting coming over shaker with sweeps.Cuttings cleaned up. RIH to 9020' 10:06 14:57 4.85 9,020 9,145 PROD2 DRILL ELOG T Start MADD pass @ 5 fpm. pumping 1.3 bpm. 14:57 15:09 0.20 9,145 9,167 PROD2 DRILL DRLG P Back on bottom drilling-1.40 bpm, 3800 psi, BHP 3930, ECD 12.6, ROP 100,WOB 1.8K,CT weight 9K 15:09 16:39 1.50 9,167 7,400 PROD2 DRILL TRIP T Inner reel iron started leaking. P/U off bottom 36K.-check source, iron is binding-POOH to window to fix. Set up and pump down backside to keep MPD on well-should have clean hole only 20 ft drilled.CT weight 35K. ****6 hours Nabors on billable rig repair rate**** Page 11 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 16:39 17:39 1.00 7,400 7,400 PROD2 DRILL CTOP T PJSM for inner reel iron. Bleed off back to pits,Shut Isolation valve on inner reel.Continue pumping down backside holding MPD, roughly.15 bpm(10 bph). Fix bracket but seal leaking on 1502 wing.Tightening didn't help. 17:39 19:39 2.00 7,400 0 PROD2 DRILL TRIP T POOH to change out seal of 1502 iron. 19:39 20:39 1.00 0 0 PROD2 DRILL PULD T At surface, PJSM, Undeploy BHA, leaving BHA in deployment slips, holding 723psi on well(MP). Double isolate reel from MP line. 20:39 21:00 0.35 0 0 PROD2 DRILL RGRP T PJSM, Repair leak on inner reel iron. ***Nabors Billable rig repair rate expired*** 21:00 00:00 3.00 0 0 PROD2 DRILL RGRP T Conitnue working on reel. Found no T1502 weco seal in leaking union. ****Nabors 3 hours non-billable repair rate**** 12/19/2010 At surface, repaired leak on inner reel iron, rebuild pressure bulk head. Deploy BHA 11 w/Rib Steer Motor, Drill AL1 Lateral 9167-9615'. Lost returns drilling across fault#2B, 9330'. Drilled ahead with .3 BPM losses. Chase low/high sweeps with wiper trips eve y 150'drilled back to window. Mud losses 241 bbls for 24 hours. 00:00 01:30 1.50 0 0 PROD2 DRILL RGRP T Continue working on reel, rebuild pressure bulk head ***Nabors 5 hours non-billable rig repair rate*** 01:30 02:30 1.00 0 0 PROD2 DRILL PULD T Pressure and surface test good. Deploy BHA 11 02:30 04:15 1.75 68 7,290 PROD2 DRILL TRIP T RIH 04:15 04:30 0.25 7,290 7,290 PROD2 DRILL DLOG T Tie in depth,-2'correction,close EDC 04:30 05:00 0.50 7,290 9,167 PROD2 DRILL TRIP T RIH to TD***Nabors NPT ends*** 05:00 07:30 2.50 9,167 9,167 PROD2 DRILL WPRT P Tag TD,wiper trip back to window 07:30 09:30 2.00 9,167 9,315 PROD2 DRILL DRLG P Qrillinq ahead-1.40 bpm, 3700, BHP 3920,ECD 12.6, ROP 70,WOB 1.4, Ct weight 11K.730'of mud system. Stacking weight @ surface 7215'. P/U-BHA wiper 30K and try quicker speed.Good WOB 1.2,CT weight 10K-drill ahead. 09:30 11:30 2.00 9,315 9,315 PROD2 DRILL WPRT P Out rate returns dropped off right before wiper trip to.8 bpm.from 1.28 bpm.Wiper trip-P/U weight 31K. Returns coming back @ 8000' 11:30 12:00 0.50 9,315 9,337 PROD2 DRILL DRLG P Drill ahead-1.40 bpm,3700, BHP 3870, ECD 12.5, ROP 80,WOB 1.5, FA CT weight 8K. 9333'-lost all returns to surface. 1.40 bpm,3500 psi, BHP 3480, ECD 11.0. Page 12 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12:00 13:00 1.00 9,337 9,333 PROD2 DRILL DRLG P P/U for weight check-heavy 46K. BHA sticking. Rate out and annular came up&weight dropped to 30K. BHA wiper-RIH tagged up early @ 9333'-P/U and RIH with rib steer on last 5'due to well Inclination-97. Difficult getting started due to motor stalls&differentail pressure. 5 or 6 attempts. 13:00' 14:00 1.00 9,333 9,360 PROD2 DRILL DRLG P Try drilling ahead from 9332'-1.40 bpm, 3730, BHP 3550,WOB 2.6K, CT weight 7K, ROP 5.Zero returns from 9331'. Started getting better ROP&returns from 9334'. Drill ahead for 20 ft then BHA wiper. Shale in samples. 14:00 15:00 1.00 9,360 9,360 PROD2 DRILL REAM P BHA Wiper 31K-RIH-tagging up @ 9334', P/U try with ribs on,stack, P/U try with low pump rate. Drifted through by working the pumps&Rib steer on then off. RIH to TD-P/U and backream troubled spot.9345'- 9325'. Clean drift. 15:00 17:00 2.00 9,360 9,465 PROD2 DRILL DRLG P Drilling ahead-1.40 bpm,3750, BHP 3890, ECD 12.6, ROP 60,WOB 2.2K, Ct weight 8K, returns.95 bpm. 17:00 19:15 2.25 9,465 9,465 PROD2 DRILL WPRT P Wiper trip-P/U weight 31K.** 170 _ bbls loss for 12 hours"* 19:15 20:00 0.75 9,465 9,515 PROD2 DRILL DRLG P Drill ahead 1.3 BPM in, .94 BPM out, 3780 CTP, 12.7 ECD,3922 BHP, 10K CTW, 100 FPH, (limit ROP to 100 FPH due to losses) 20:00 20:15 0.25 9,515 9,524 PROD2 DRILL DRLG P Limit WOB to 1.8K allowing BHA to drop. Prevent drilling out of the top of A4 20:15 20:30 0.25 9,524 9,524 PROD2 DRILL WPRT P Stall PU 32K, RIH to drill,stack out. PU 40K. PUH for BHA wiper 20:30 22:30 2.00 9,524 9,615 PROD2 DRILL DRLG P Drill ahead 1.3 BPM in, .94 BPM out, 3780 CTP, 12.7 ECD, 3922 BHP, 10K CTW, 100 FPH, (limit ROP to 100 FPH due to losses) Pump 10 bbrl low followed by 10 bbrl high vis sweep 22:30 00:00 1.50 9,615 9,615 PROD2 DRILL WPRT P Wiper trip back to window, chasing sweep 12/20/2010 Drill AL1 Lateral 9615-10215',chasing low/high sweeps with wiper trips back to window every 150'drilled. Current losses.2 BPM.Total losses for last 24 hours, 134 Bbrls. 00:00 01:15 1.25 9,615 9,615 PROD2 DRILL WPRT P Conintue wiper trip to window Tie in depth to RA marker-3', RIH 01:15 05:00 3.75 9,615 9,765 PROD2 DRILL DRLG P Drill ahead 1.3 BPM in, .98 BPM out, 3874 CTP, 12.85 ECD, 3949 BHP, 10K CTW,30-40FPH 05:00 07:45 2.75 9,765 9,765 PROD2 DRILL WPRT P Wiper trip back to window, 132 bbrls loss to formation last 12 hours.A-5 section was good during wiper. Page 13 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 07:45 09:45 2.00 9,765 9,914 PROD2 DRILL DRLG P Drilling ahead-1.40 bpm 3600, BHP 3908, ECD 12.7, ROP 90,WOB 2.2K,Ct weight 6K, rate out 1.10 bpm. 09:45 12:45 3.00 9,914 9,914 PROD2 DRILL WPRT P Wiper trip-32K P/U weight.Time sweep out on bottom. Shale area looked good during wiper. 12:45 16:15 3.50 9,914 10,065 PROD2 DRILL DRLG P Drilling ahead-1.40 bpm, 3800 psi, BHP 3923, ECD 12.7, ROP 28, WOB 3K, CT weight 7K. 1.2 rate out. Stacked out-P/U 30 ft early. BHA wiper-P/U weight 35K. pump sweeps.Good ROP 100 fph. 16:15 19:30 3.25 10,065 10,065 PROD2 DRILL WPRT P Sweep @ bit-Wiper trip 32K- 73 bbls losses in past 12 hours. Tie in depth to RA marker, -2' Correction Did not set down weight through troubled area.9330-9345' Wiper trip looked good 19:30 21:30 2.00 10,065 10,215 PROD2 DRILL DRLG P Drilling ahead-1.32 bpm, 1.2 BPM out, 3925 BHP, 3923 CTP, ECD 12.25,WOB 1-2K, 7-10K CTW surface. 80-100 FPH 21:30 00:00 2.50 10,215 10,215 PROD2 DRILL WPRT P Wiper trip to window,32K PUW 12/21/2010 Drill AL1 lateral 10215 to 10677'TD. Perform wiper trip to surface pumping low/high vis sweeps. RBIH to TD. Total of 118 bbls losses to formation. 00:00 01:00 1.00 10,215 10,215 PROD2 DRILL WPRT P Conitnue wiper trip 01:00 03:00 2.00 10,215 10,365 PROD2 DRILL DRLG P Drilling ahead-1.32 bpm, 1.2 BPM out,3925 BHP,3923 CTP, ECD 12.25,WOB 1-2K, 7-10K CTW surface.60-80 FPH 03:00 06:30 3.50 10,365 10,365 PROD2 DRILL WPRT P Wiper trip to window chasing low/high sweep, 32K PUW 06:30 09:30 3.00 10,365 10,515 PROD2 DRILL DRLG P Drilling ahead-1.40 bpm,3850, BHP 3970, ECD 12.8,WOB 2K, Ct weight 7K, ROP 90,Out rate 1.18 bpm. Cutting looking consulidated clay-silt, heavier than normal. Pump a sweep after 100ft drilled&Pull a mini-wiper of 200'. P/U weight 31K. Drill ahead. 09:30 13:00 3.50 10,515 10,515 PROD2 DRILL WPRT P Wiper trip-31K-cutting cleaned up &brought up more near the top of the wiper.Tie in correction-3 ft. 13:00 15:30 2.50 10,515 10,620 PROD2 DRILL DRLG P Drilling ahead-1.38 bpm, 3700, BHP 3980, ECD 12.9, ROP 100,WOB 1.8, CT weight 7K.Weight transfer @ 10620'-P/U 200'31K. Pump Sweep 7 low,7 high. Page 14 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 15:30 17:00 1.50 10,620 10,677 PROD2 DRILL DRLG P Sweeps at bit while on bottom drilling.Good ROP 100 fph until found ceiling of A-4 @ 10677'ROP slowed to 15 FPH.TD. 17:00 21:30 4.50 10,677 0 PROD2 DRILL WPRT P **TD Lateral**-Wiper trip to Swab valves chasing low/high sweep. P/U rP weight-31K Pump low/high sweep at window, Cont. POOH to surface,drilling rate through bit. 21:30 23:00 1.50 0 7,450 PROD2 DRILL WPRT P At surface, RBIH with EDC open, pumping 1.3 BPM 23:00 23:15 0.25 7,450 7,450 PROD2 DRILL WPRT P At window close EDC. RIH to TD,get SBHP 23:15 00:00 0.75 7,450 10,000 PROD2 DRILL WPRT P Tie in depth to RA marker.-8' correction. RIH to TD 12/22/2010 Lay in liner running pill TD to 8000'. Displace well to 12ppg KWF 8000'to surface.Maintenance/Repair top drive. PU/MU liner segment#1,68jnts slotted liner with shorty deployment sleeve. RIH, releasing liner on bottom 10687',TOL 8447'. POOH keeping well dead. Service/Repair injector head. 00:00 01:00 1.00 10,000 10,677 PROD2 DRILL WPRT P Continue RIH to TD. SBHP 3625 psi 01:00 02:30 1.50 10,677 8,050 PROD2 DRILL TRIP P Tag TD, POOH laying in Liner running pill 1 for 1, paint flag 8368', EOP 8300'. 02:30 04:30 2.00 8,050 0 PROD2 DRILL TRIP P POOH, Displace well to 12ppg KWF from 8050'to surface. Paint flag 5168'. EOP 5300'. 04:30 04:45 0.25 0 0 PROD2 DRILL OWFF P At surface, monitor well for flow 04:45 06:15 1.50 0 0 PROD2 DRILL PULD P PJSM, LD tools 06:15 07:15 1.00 0 0 COMPZ CASING RURD P Prepare riq floor for running liner. Monitor well for losses.Well is taking about 1 bph to keep topped up. 07:15 10:00 2.75 0 0 COMPZ CASING RGRP T Weight sensor not functioning properly on TOP drive system. Troubleshoot-fix hydraulic fittings and replace hose while working out electronic load cell issues. 10:00 11:30 1.50 0 0 COMPZ CASING RGRP T Electrician continuing to work on load sensor&re-calibrate load cell program. ***Nabors 1.5hrs Non Billable Rig .. Repair*** 11:30 14:30 3.00 0 2,228 COMPZ CASING PUTB P PJSM-Start P/U liner assembly total of 68 joints with shorty deployment sleeve. 14:30 15:00 0.50 2,228 2,273 COMPZ CASING PULD P P/U Liner running BHA with Baker GS. 15:00 18:00 3.00 2,273 9,795 COMPZ CASING RUNL P RIH pumping .3 bpm of 12.0 KWF. Tie in+5ft correction to flag.Weight check 30K. RIH weight 18K.Clean through window. Page 15 of 20 s Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 18:00 18:15 0.25 9,795 9,795 COMPZ CASING RUNL P Set down weight-8K at 9795'. BHA is approximately across window. Try to work string down. Had heavy P/U to 52K to 9400', had to work up at a quicker speed to break free. 18:15 18:30 0.25 9,795 10,687 COMPZ CASING RUNL P RIH 70 FPM, past 9795',Continue RIH to TD 18:30 19:00 0.50 10,687 7,265 COMPZ CASING RUNL P Taq bottom 10687',Online with pumps,to release off liner. 1.5 BPM, 4300psi, PUH 31K CTW. Liner 'p t released. Pump KWF across top, PUH to window.Subtract liner length from depth.Swap pumping down the CT KWF. POOH 19:00 19:15 0.25 7,265 7,265 COMPZ CASING DLOG P Tie in depth with gamma.-5' correction 19:15 21:30 2.25 7,265 0 COMPZ CASING RUNL P POOH, Paint flag 7045', EOP 7400' 21:30 22:45 1.25 0 0 COMPZ CASING PULD P At surace, Flow check good, PJSM, lay down tools 22:45 23:45 1.00 0 0 COMPZ CASING RGRP T Found broken dove tail in injector sump from gripper block carrier.Also found broken gripper block bolt on seperate carrier. Hot tap broken stud.**Non-billable time** 23:45 00:00 0.25 0 0 COMPZ CASING SFTY P P.ISM running liner. 12/23/2010 PU/MU 11 jnts Slotted Liner with OH anchored billet. RIH,tag 8447'TOL segment 1,set OH anchor with single slip 180deg.TOL 8076'. POOH keeping well dead. Perform Bi-Weekly BOP function test. PU/MU BHA 13, 1.1 AKO. RIH sidetrack for AL1-01 lateral off alluminum billet. Drill Ahead AL1-01 lateral 8076'-8177'. Gamma component failed. POOH, undeploy BHA 13, Deploy BHA 14 with new Gamma component, 1.1 411/ AKO, RIH.Total 103 bbrls of 12pp• KWF(Sodium Bromide Brine)lost to formation running AL1 liner. 00:00 01:30 1.50 0 0 COMPZ CASING PUTB P PUMU liner segment#2, 11 jnts slotted liner,OH anchored billet and coil track 01:30 03:30 2.00 433 7,433 COMPZ CASING RUNL P RIH 03:30 03:45 0.25 7,433 7,433 COMPZ CASING RUNL P Tie in depth to EOP flag-2' correction, Close EDC, RIH to liner segment#1 Weight check 30K, RIHW 18K 03:45 04:15 0.50 7,433 8,447 COMPZ CASING RUNL P Taq liner segment#1,8447',3K WOB. PUH to neutral weight on WOB. Online with pumps setting OH anchor. single slip 180deg. Set-3500 CTP,3.6K WOB. TOL 8074' 04:15 06:45 2.50 8,447 44 COMPZ CASING TRIP P POOH 06:45 07:45 1.00 44 0 COMPZ CASING PULD P CT @ surface-flow check&lay down BHA. Inspect injector at the same time. No segments found during inspection. 07:45 08:15 0.50 0 0 COMPZ CASING BOPE P Weekly Function test BOP's. PJSM for P/U BHA. 08:15 09:15 1.00 0 72 PROD3 STK PULD T P/U BHA#14-1.1 AKO with 2.73" Bi-center Page 16 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 09:15 11:45 2.50 72 7,465 PROD3 STK TRIP T RIH pumping .3 bpm.Tie in-2ft& swap well over to old drilling mud. P/U weight 27K.**total losses of 103 bbls**during liner runs. 11:45 12:15 0.50 7,465 8,075 PROD3 STK TRIP T RIH clean through window,dry tag @ 8075' P/U &set up to STK. 12:151 14:15 2.00 8,075 8,078 PROD3 STK KOST T Start time milling -1.40 bpm, 3700 l psi, BHP 3780, ECD 12.2, returns 1 I bpm,WOB 1.1K, CT weight 14K. 1/ Light Alum. shaving over shakers 1 ft into. -01 14:15 15:00 0.75 8,078 8,105 PROD3 STK KOST T Increase speed to 15-20 fph. Drill to 8105 and dry run through billet. clean. 15:00 16:00 1.00 8,105 8,177 PROD3 DRILL DRLG T Drilling ahead-1.40 bpm,3800, BHP 3840, ECD 12.4,WOB 1K, CT weight 13K, ROP 100, Rate out 1.3 bpm. 16:00 16:30 0.50 8,177 7,500 PROD3 DRILL WPRT T Geo wiper-P/U weight 30K. Gamma tool failed-try&troubleshoot while wiping to window. 16:30 19:00 2.50 7,500 0 PROD3 DRILL TRIP T Open EDC-POOH to change out Gamma tool ***BHI non-billable rig time*** 19:00 19:15 0.25 0 0 PROD3 DRILL SFTY T At surface, PJSM 19:15 20:15 1.00 0 0 PROD3 DRILL PULD T Undeploy BHA 20:15 21:15 1.00 0 0 PROD3 DRILL PULD T Build BHA with new gamma,same Resistivity tool Service injector head Planned time, ConocoPhillips request to run same Resistivity BHA component. • 21:15 21:30 0.25 0 0 PROD3 DRILL SFTY T PJSM 21:30 22:30 1.00 0 0 PROD3 DRILL PULD T Deploy BHA 14, 1.1 AKO with Bi-Center, new Gamma component, RR resistivity component. 22:30 23:45 1.25 0 7,290 PROD3 DRILL TRIP T RIH 23:45 00:00 0.25 7,290 7,290 PROD3 DRILL DLOG T Tie in depth-4'Correction, RIH 12/24/2010 Drill AL1-01 Lateral 7675-8694', performing wiper trips back to window 7500',every 150'drilled. Drill Ankerite 8643'-8694'. Tie in depth to RA marker every 3rd wiper trip.Total Losses 24hrs.31 bbrls 00:00 02:30 2.50 8,177 8,330 PROD3 DRILL DRLG T Drill Ahead, 1.4 BPM in, 1.26 BPM out, 3500 CTP, 14 CTW,2K WOB, 12.4 ECD, 3734 BHP. Perform mud swap. 02:30 03:30 1.00 8,330 8,330 PROD3 DRILL WPRT T Wiper trip to window, 32K PUW 03:30 05:30 2.00 8,330 8,480 PROD3 DRILL DRLG T Drill Ahead, 1.4 BPM in, 1.26 BPM out, 3500 CTP, 14 CTW, 2K WOB, 12.4 ECD, 3734 BHP. 05:30 07:00 1.50 8,480 8,480 PROD3 DRILL WPRT T Wiper trip-clean Page 17 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 07:00 12:30 5.50 8,480 8,635 PROD3 DRILL DRLG T Drilling ahead in A-3 sand-Hit ankerite 8523'. 1.40 bpm,3800, BHP 3750, ECD 12,WOB 3K, Ct weight 9K, ROP 7. Losing 1 -2 bph. 12:30 14:00 1.50 8,635 8,635 PROD3 DRILL WPRT T Wiper trip with tie in Zero correction. P/U weight 32K 14:00 00:00 10.00 8,635 8,694 PROD3 DRILL DRLG T Drilling ahead-1.37 bpm,3600, BHP 3775, ECD 12.2, ROP 120,WOB 1.6K, CT weight 11K, 1.26 bpm out. More ankerite 8643'.3-7 FPH. Losing 1 -2 bph. 12/25/2010 Drill AL1 Lateral 8694-8900'. Drill thortjgh ankerite stringers starting 8523'to TD.TD AL1 Lateral 8900'. PUH to 5000'chasing low/high sweeps. RIH, layin liner running pill(12ppg KWF with beads)TD to window. Displace KWF from window to surface.24 hr.Total Losses 32 bbrls FloPro 00:00 06:30 6.50 8,694 8,719 PROD3 DRILL DRLG T Drilling ahead-1.37 bpm, 3600, BHP 3775, ECD 12.2,WOB 1.6K, CT weight 11K, 1.26 bpm out. More ankerite 8643'. 3-4 FPH. Losing 1 -2 bph. 06:30 06:45 0.25 8,719 8,719 PROD3 DRILL WPRT T Do a 50'P/U to check weight and bit cleaning. 32K. 06:45 07:00 0.25 8,719 8,722 PROD3 DRILL DRLG T Drilling ahead-1.45 bpm,3900, BHP 3810, ECD 12.1, ROP 15 fph, CT weight 9.5K,WOB 3K. 07:00 11:00 4.00 8,722 8,810 PROD3 DRILL DRLG T ROP change to 110 fph-back into Ankerite 8793' 11:00 12:30 1.50 8,810 8,810 PROD3 DRILL WPRT T Wiper trip-P/U weight 32K.Zero correction on tie in. 12:30 14:30 2.00 8,810 8,850 PROD3 DRILL DRLG T Drilling ahead-1.35 bpm, 3500, BHP 3810, ECD 12.2, ROP 80,WOB 1.5, CT weight 11K, rate out 1.25 bpm. 14:30 16:00 1.50 8,850 8,865 PROD3 DRILL DRLG T Slow ROP-P/U weight 32 K-wipe up 100'- Drill ahead CT weight stacking to zero with 2.6K on bit. ROP 8 fph. Pump 5/5 sweeps. Not much change in weight transfer. Possible bit dulling? 16:00 19:00 3.00 8,865 8,900 PROD3 DRILL DRLG T P/U wiper 200'.Weight 32K. Drill ahead-1.30 bpm, 3560, BHP 3820, ECD 12.2, ROP 2,WOB 3.5K, CT -r-D weight 3K. Spoke with town and 18:00 maybe TD. 19:00 22:00 3.00 8,900 5,000 PROD3 DRILL WPRT T TD AL1-01 Lateral, pump low/high vis sweeps,chasing sweeps back up to 5000'. Returns look good.RIH 22:00 22:15 0.25 5,000 7,290 PROD3 DRILL DLOG T Tie in depth with Gamma 0 correction. 22:15 23:00 0.75 7,290 8,900 PROD3 DRILL WPRT T RIH to TD 23:00 00:00 1.00 8,900 7,500 PROD3 DRILL WPRT T Tag TD, PUH laying KWF with beads to window 12/26/2010 POOH displacing well to 12ppg KWF. PU/MU AL1 liner(32jnts slotted, 1 ljnts solid). RIH setting liner on bottom 8900',TOL 7468'. POOH, keeping well dead. PU/MU, KB Liner Top Packer setting on top AL1 liner. Top of packer 7461.95'. Displace well to Sea Water,freeze protect well 2500'to surface. Undeploy BHA 17. Total bbrls lost 72 bbrls 12ppg KWF. Page 18 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 00:00 02:00 2.00 7,500 0 PROD3 DRILL TRIP T POOH,displacing well to KWF Paint EOP flag 7300'and 5300' 02:00 02:15 0.25 0 0 PROD3 DRILL OWFF T At surface. Monitor well for flow 02:15 03:45 1.50 0 0 PROD3 DRILL PULD T PJSM,Work draw works up and down,-68 below windchill. LD BHA 15. 03:45 04:30 0.75 0 0 COMPZ CASING RURD T Prep floor for running liner 04:30 06:30 2.00 0 0 COMPZ CASING PUTB T PU liner-crew change-top up fluid level 3 bbls. 06:30 09:30 3.00 0 1,474 COMPZ CASING PUTB T Continue P/U Liner. 32 slotted/12 solid&Sealbore Deployment Sleeve &BHI coiltrack assembly 09:30 11:15 1.75 1,474 8,901 COMPZ CASING RUNL T RIH pumping through GS profile @.3 bpm. P/U weight 33 K at the window. Correction +1ft. Clean through window. Set down @ 8901.5'to 6K. P/U weight 38K.Set down 5K. 8901.5' 11:15 11:45 0.50 8,900 7,470 COMPZ CASING DLOG T Increase pump rate to 1.2 bpm, P/U weight 30 K. **Liner&seal bore deployment sleeve set from 8900-7469'** POOH&Log from 7265'-1ft correction. 11:45 13:15 1.50 7,470 55 COMPZ CASING TRIP T POOH laying in KWF 13:15 14:00 0.75 55 55 COMPZ CASING PULD T PJSM-work top drive for 30 mintues prior to P/U BHA due to temperatures. 14:00 14:30 0.50 0 55 COMPZ RPEQP1 PULD T Lay down BHA&P/U Liner top Packer assembly-guage the 5/8" ball. Max. OD is 2.78". Set ball in liner setting tool. 14:30 16:30 2.00 55 7,200 COMPZ RPEQP1 TRIP T RIH @ 50 fpm with EDC open pumping .3bpm from 100'. Slow down during restrictions to 25 fpm. 16:30 17:00 0.50 7,200 7,450 COMPZ RPEQP1 DLOG T Tie in from 7270'-2ft correction. Continue RIH slowly. P/U weight 31K. Stop @ 7450'close EDC. Stop pumping. 17:00 17:30 0.50 7,450 7,471 COMPZ RPEQP1 PACK T Tag @ 7471'-Set down 5K to 7472'. P/U weight 33K. RIH tag again.7471' -P/U 2 ft past break over-7468.5'. Start pumping down CT to 1500psi. Stop pumping and slack off weight. 3/44- Set down 6 Kan 7469.8'Good set of packer element. Pressure up backside to 800 psi. IA 240/OA zero.**Max.differential presure the element is good for is 2500 psi.**Holding 800 solid, Good test. Bleed off to pits. Pressure up to 2800 psi down CT string.Set collets and P/U on CT. Page 19 of 20 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 17:30 19:00 1.50 7,471 7,450 COMPZ CASING DISP P P/U weight 31K.Top of packer @ 7462'.Open EDC and circulate out KWF with SW. 19:00 20:45 1.75 7,450 2,500 COMPZ CASING TRIP T POOH 20:45 21:15 0.50 2,500 2,500 COMPZ CASING DISP P Circulate diesel 28bbrls in CT. Circulate 19bbrls hot diesel through reverse circulating line out to tiget tank to warm up TT line. 21:15 21:45 0.50 2,500 2,500 COMPZ CASING FRZP P Circulate diesel out CT with SW, freeze protecting well. 21:45 22:30 0.75 2,500 0 COMPZ CASING TRIP P POOH, 1 for 1 22:30 00:00 1.50 0 0 COMPZ CASING PULD P At surface, PJSM. Undeploy BHA 12/27/2010 LD BHA 17, Flush and Purge stack and rig. Unstab CT. Swap out skates on Injector.Stab CT Head while waiting on weather. 00:00 00:30 0.50 0 0 COMPZ CASING PULD P LD BHA 00:30 02:00 1.50 0 0 DEMOB WHDBO MPSP P PJSM,set BPV 02:00 04:00 2.00 0 0 DEMOB WHDBO CIRC P Flush and Purge stack and rig 04:00 06:00 2.00 0 0 DEMOB WHDBO RURD P Rig down-low pressure return line _ froze off. Start chasing frozen lines. 06:00 09:00 3.00 0 0 DEMOB WHDBO CIRC P PJSM-set up to ciculate down CT string back to pits to keep fluid moving while thawing out low pressure return lines. Current ambient temp is-47. 09:00 11:00 2.00 0 0 DEMOB WHDBO CIRC P All lines are ice free. Begin purging CT string with compressor. recovered 17 bbls. 11:00 13:00 2.00 0 0 DEMOB WHDBO CIRC P Begin blowing down BOP lines&HP iron. Freeze protect wellhead&swab valves. 13:00 14:30 1.50 0 0 DEMOB WHDBO CTOP P PJSM for unstabbing pipe. Unstab CT from injector. Secure pipe for rig move.Vac truck disabled on location. Last load waiting to be removed. 14:30 16:00 1.50 0 0 DEMOB WHDBO RGRP P Remove stipper from Injector. Roll chains out of injector. removed last load of fluid off location. 16:00 00:00 8.00 0 0 DEMOB WHDBO RGRP T Replace skates in injector and lower top drive to warm up. RD/ND Wait in weather, Charges transfer to 1B-19 Page 20 of 20 rp AL Et ET LASEA SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 V. Cawvey Alaska Wells Manager ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510 Re: Kuparuk River Field, Kuparuk River Oil Pool, 2Z-23A ConocoPhillips Alaska, Inc. Permit No: 210-157 Surface Location: 1304' FSL, 334'FEL, SEC. 11, T11N, R9E, UM Bottomhole Location: 2534' FNL, 1876' FEL, SEC. 10, T11N, R9E, UM Dear Mr. Cawvey: Enclosed is the approved application for permit to redrill the above referenced service well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, a iv Daniel T. Seamount, Jr. Chair DATED this 7day of October, 2010. cc: Department of Fish 86 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) ri.,.i ail J'. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION OCT 2 6 2010 PERMIT TO DRILL AlastatiddieasCons.Comession 20 AAC 25.005 Anchorage la.Type of Work: • lb.Proposed Well Class: Development-Oil ❑ Service-Winj a . Single Zone ❑✓ •lc.Specify if well is proposed for: Drill ❑ Re-drill El Stratigraphic Test ❑ Development-Gas ❑ Service-Supply ❑ Multiple Zone❑ Coalbed Gas ❑ Gas Hydrates❑ Re-entry ❑ Exploratory ❑ Service-WAG ❑ Service-Disp ❑ Shale Gas ❑ 2.Operator Name: 5. Bond: U Blanket U Single Well 11.Well Name and Number: ConocoPhillips Alaska, Inc. Bond No. 59-52-180 • 2Z-23A 3.Address: 6.Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage,AK 99510-0360 MD: 10800' • TVD: 6006' • Kuparuk River Field . 4a. Location of Well(Governmental Section): 7.Property Designation(Lease Number): Surface: 1304'FSL,334'FEL,Sec. 11,T11N,R9E, UM • ADL 25646:25645' Kuparuk River Oil Pool Top of Productive Horizon: 8.Land Use Permit: 13.Approximate Spud Date: 1074'FSL,312'FWL,Sec. 11,T11N,R9E,UM 2577,2576 11/15/2010 Total Depth: 9.Acres in Property: 14.Distance to 2534'FNL, 1876'FEL,Sec. 10,T11N,R9E,UM 2560 Nearest Property: 29800 4b.Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: • 112 feet 15.Distance to Nearest Well Open Surface:x- 529376 • y- 5966062 Zone- 4 GL Elevation above MSL: . 71 feet to Same Pool: 2X-15,1300 16.Deviated wells: Kickoff depth: • 7510 ft. 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 99.6° deg Downhole:3500 psig • Surface:3000 psig - 18.Casing Program: Specifications Top - Setting Depth -Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD ND (including stage data) 3" 2.375" 4.7# L-80 ST-L 2620' 8180' 5964' 10800' 6006' slotted liner R 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured) Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured) 7972 6259 7870 6163 Casing Length Size Cement Volume MD TVD Conductor/Structural 121' 16" 200 sx ASI 121' 121' Surface 4242' 9.625" 890 sx AS III,480 sx Class G 4242' 3465' Intermediate Production 7960' 7" 338 sx Class G 7960'\ 6232' Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): 7400'-7418',7446-7495',7678'-7688',7696-7726',7750'-7770',7804'-7809' 5807'-5821',5841'-5879',6017'-6025',6031'-6054',6072'-6087',6113'-6117' 20.Attachments: Property Plat❑ BOP Sketch❑✓ Drilling Program 0 Time v.Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements ❑� 21.Verbal Approval: Commission Representative: Date: ��//��/J(J� O 22. I hereby certify that the foregoing is true and correct. Contact Jill Long @ 263-4093 L (�� Printed Name V. Cawvey Title Alaska Wells Manager Signature Z Phon 265-6306 Date io/ 77,4061 Commission Use Only / Permit to DrillAPI ber: Permit Approval See cover letter Number: t( I _ 50_0a-7z5 (`1_- �-)I Date: 1,\a_,.\,,, forIother requirements Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained in shales: 12/ �� I'35610 / S;, oP SCS/L Samples req'd: Yes El No Mud log req'd: Yes ❑ No [re Other: 2 r h. /�„n J� e5� 2 measureMIT /`e ss: Yes [r No ❑ Directional svy req'd: Yes z No C]— Lt (+Hilt .. a P t-re f ib� i r. a .,o et- wI Aio 2e ,v- nc.re.o /,///27. .,.."0 jam' APPROVED BY THE COMMISSION DATE: sagoi�A ; ,COMMISSIONER Form 10-401 (R-vised 7/2009) This permit is valid fdrz4 in.n s ••0 t e4date of approval(20 AAC 25.005(9)) �J �,/Submit in Duplicate /6.27•/0 c�- (0 rr'• -(c••fir, ConocoPhillips p Alaska P.O.BOX 100360 ANCHORAGE,ALASKA 99510-0360 October 21, 2010 ECEN EZ M71-1- 2 6 2010 Commissioner- State of Alaska Alaska Oil&Gas Conservation Commission 333 West 7th Avenue Suite 100 Ata6w3 Oil 8th CORS. Anchorage, Alaska 99501 Anchorage Dear Commissioner: ConocoPhillips Alaska, Inc. hereby submits an application for permits to drill two lateral sidetracks out of Kuparuk Weil 2Z-23 using the coiled tubing drilling rig, Nabors CDR2-AC. Work is scheduled to begin on 2Z-23 in later November 2010. The CTD objective is to drill two lateral sidetracks (2Z-23A and 2Z-23AL1); targeting the A3 and A4-sands to access reserves away from the parent wellbore, across isolating faults. The two laterals will be drilled from one, dual string casing exit through the selective interval (3.5"tubing x 7"casing). Attached to this application are the following documents: - Permit to Drill Application Forms for 2Z-23A and 2Z-23AL1 - Detailed Summary of Operations - Proposed Schematic - Directional Plans - Anti-collision Review - BOP Schematic If you have any questions or require additional information please contact me at 907-263-4093. Sincerely, Jill L g Coiled Tubing Drilling Engineer Permit to Drill Summary of Operations KRU 2Z-23 and 2Z-23AL1 Lateral Sidetracks Coiled Tubing Drilling Well History and Obiective Injecting well 2Z-23 was originally drilled and completed as in 1995 as a single, selective completion with both the A and C sands perforated. The 2Z-23 wellbore is in an area that contains many sealing and highly baffling faults, as well as a prolific C-sand. This faulting has caused a significant amount of compartmentalization in the A sands and has resulted in lower than expected oil recovery. The purpose of the CTD project is to drill two CTD lateral sidetracks in the A4 and A3 sands away from the parent . wellbore and across faults that are believed to be isolating. The sidetracks will be injecting laterals, the same as the parent wellbore. The outcome expected is improved sweep efficiency and oil recovery. Both the A and C sand perfortions in the parent wellbore are planned to be plugged using cement prior to CTD rig arrival. The lateral footage drilled in the immediate vicinity of parent well will recover the existing A sand perforations. A review of the C sand in the area confirmed that abandoning the C sand perforations in this parent wellbore should not have a significant impact on the rates of offset producers. Operational Outline Pre-Rig Work Remaining 1. Changeout all gas lift valves to dummy valves and caliper the 3.5"tubing across the selective interval. 2. Set a plug just above the bottom packer, isolating the A sand perforations. Pressure test the tubing to confirm integrity of the selective. 3. Punch holes —5' of holes below the sliding sleeve (to ensure cement in the annulus below the sliding sleeve). 4. Set EZSV cement retainer 5. Pump cement into the 3.5" x 7" annulus, squeezing off the A and C sand perforations and placing good cement in the annulus across from the CTD KOP 6. Perform a dummy whipstock drift. Set the lower whipstock at—7510' 7. Set BPV and prepare wellsite for rig arrival. . igoP re"s� P4A Rig Work General Plan 35o0105. 1. MIRU Nabors CDR2-AC rig using 2"coil tubing. NU 7-1/16" BOPE, test. 2. Mill a 2.80", dual-string window exit with high-side orientation off of the whipstock set pre-rig arrival 3. 2Z-23A Lateral a. Drill 2.70"x 3" bi-center lateral in the A4 sand • - b. Load well with kill weight fluid. Run 2%" slotted liner with an aluminum liner-top billet from TD to 'g the kickoff point for the 2Z-23AL1 lateral 4. 2Z-23AL1 Lateral a. Drill 2.70"x 3" bi-center lateral in the A3 sand • b. Load well with kill weight fluid. Run 2%"slotted liner with a deployment sleeve on top from TD to just inside the window 5. Freeze protect. ND BOPE. RDMO Nabors CRD2-AC. Handover to Production group. Page 1 of 3 MAL 10/21/2010 PTD Applications KRU 2Z-23A and 2Z-23AL1 Operational Details Hazards — Shale stability is a potential problem. Well 2Z-23 is in close proximity to 2Z-13 which encountered • significant shale problems while drilling. Managed pressure drilling (MPD) will be utilized on this well to minimize exposure problems. — Drillsite 2Z is an H2S pad. The maximum recorded H2S reading on the pad in 2010 was 135 ppm on well . 2Z-10 measured on 01/13/2010. Well 2Z-29 is the closest producing well to 2Z-23 (located —90' to the right on surface) and had an H2S reading of 50 ppm on 01/13/2010. All H2S monitoring equipment will be operational. Fluids Program — Chloride-based Biozan brine (8.6 ppg)will be used for window milling operations. • • — Chloride-based Flo-Pro mud (9.8 ppg)for drilling operations. — 2Z-23 does not contain a subsurface safety valve so completion kill weight fluid will be used for running completions. Disposal — No annular injection on this well. — Class II liquids to KRU 1R Pad Class II disposal well — Class II drill solids to Grind & Inject at PBU Drill site 4 — Class I wastes will go to Pad 3 for disposal. New Completion Details Lateral Name Liner Liner Liner Liner Liner Details Top Btm Top Btm MD MD SSTVD SSTVD 2Z-23A 8180' 10800' 5970' 6006' 2% 4.7#, L-80, ST-L slotted liner; aluminum liner top billet on top. 2%", 4.7#, L-80, ST-L slotted liner; 2Z-23AL1 7500' 10620' 5787' 6000' deployment sleeve on top. Blank liner will, be placed across the Build section and shale sections. Existing Casing/Liner Information Category OD Weight Grade Connection Top Btm Top Btm Burst Collapse (ppf) MD MD TVD TVD psi psi Conductor 16" 65 H-40 Welded 0 121 0 121 1640 630 Surface 9%" 40 L-80 BTC 0 4242 0 3474 5750 3090 Casing 7" 26 L-80 BTC-Mod 0 7960 0 6250 7240 5410 Tubing 3'/2" 9.3 L-80 ABM-EUE 0 7568 0 5950 10160 10540 Tubing 2-'/8" 6.5 J-55 ABM-EUE, IPC 7568 7597 5950 5972 7260 7680 Page 2 of 3 ORIG1N , \L 10/21/2010 PTD Applications KRU 2Z-23A and 2Z-23AL1 Directional Planning - See attached directional plans for each of the three laterals. - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. - Distance to Nearest Property Line(measured to KPA boundary at closest point) Lateral Name Distance 2Z-23A 29800' • 2Z-23AL1 30400' - Distance to Nearest Well within Pool (toe measured to offset well) Lateral Name Distance Well 2Z-23A 1300' Toe measured r to 2X-15 • 2Z-23AL1 1250' Toe measured to 2X-15 Logging MWD directional, resistivity, and gamma ray will be run over the entire openhole section. • Reservoir Pressure The most recent static BHP survey in well 2Z-23 was taken August 2009. The reservoir pressure was measured at 2725 psi at 7567' MD/5840'TVDss, corresponding to 9.0 ppg EMW. • Well Control - Two well bore volumes (-190 bbl) of 12.0 ppg kill weight fluid will be within a short drive to the rig during drilling operations. In this situation, a"wellbore volume" is defined as the tubing volume plus the volume of the longest lateral. - BOP diagram is attached for operations with 2" coil tubing. - Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. Maximum surface pressure anticipated while sidetracking out of 2Z-23 is -3000 psi, assuming a gas gradient to surface. This maximum potential surface pressure is calculated using the maximum expected reservoir pressure from 2Z-23 based on recent injection wellhead pressures at 2Z-23. (Recent wellhead pressure readings have been -950 psi which correlates to a bottomhole pressure at the kickoff point of -3500 psi. Assuming a gas gradient of 0.1 psi/ft, the maximum surface pressure expected would be -3000 psi.) - The annular preventer will be tested to 250 psi and 2500 psi. Managed Pressure Drilling Managed pressure drilling (MPD) techniques will be employed to provide constant bottomhole pressure by using - 9.8 ppg drilling fluid in combination with annular friction losses and applied surface pressure. Constant BHP will be utilized to reduce pressure fluctuations to help with hole stability. Applying annular friction and choke pressure also allows use of less expensive drilling fluid and minimizes fluid losses and/or fracturing at the end of the long well bores. A hydraulic choke for regulating surface pressure is installed between the BOPE choke D manifold and the mud pits, and is independent of the BOPE choke. Using this technique will require deployment of the BHA under trapped wellhead pressure. Pressure deployment of the 2%" BHA will be accomplished utilizing the 2%" pipe rams and slip rams. The annular preventer will act as a secondary containment during deployment and not as a stripper. The well will be loaded with overbalanced fluid prior to running completions. Operating parameters and fluid densities will be adjusted based on real-time bottom hole pressure measurements while drilling and shale behavior. Page 3 of 3 I � �- 10/21/2010 PTD Applications KRU 2Z-23A and 2Z-23AL1 A D e. Quarter-Mile Injection Review The following wells lay within one-quarter mile of the proposed 2Z-23 CTD laterals. The distances noted are the closest proximity between these wellbores and any point along the planned CTD laterals. • - 2X-16 (active producer)-This wellbore is located -1245' to the southwest of laterals 2Z-23A and 2Z-23AL1. This well is a single completion with commingled production from perforations in both the A and C sands. - 2X-15 (active producer)-This wellbore is located -1285' to the northeast of laterals 2Z-23A and 2Z-23AL1.• This well is a selective completion with capability to produce from both the A and C sands. - 2Z-03 (shut-in injector) -This wellbore is located -1295' to the west of laterals 2Z-23A and 2Z-23AL1. This • well is a selective completion with capability to inject into both the A and C sands. The well is currently shut-in awaiting a flowline repair that will not likely occur until the year 2011. Page 4 of 3 ORIGINAL 10/21/2010 0 c Z p g H 0 2 ❑ c F- ❑ m CC .-- — LO m p o CC Y v � � Q (0 o CC inQ c',.2 N V OJ co N N M co 0 O m �) rr11 m v Y Noo N ©/�� N 0 V Y d' N O N LJ CO u7i v O N CC MY Y N g . m (a-o N CO -_ N -Co ca _Q YY 2 r--- co r /v E c c �`N �N1 0) co Ll ~ j M . j V V Q fy O co U F— 00 c0 -- a) co U N M N a) 0) W C CD Q 0) �N`N) ;c N > C D () c V`-' (7 o) N m /����` /���1 C U) W CC 0) 2 - 2 3 -C V V co 9 "p m o - o o -CL n 8 tO o X o) 3 2 * 2 2 N __I 2 CDN" m n C -.- U N N N N Y Y N E N - N N Eco C) C r- l- OS c) .-- 03 _ Z W O M M M M cO co M U M F- M M Q W U co UN u) imo) IP I IIII 1 I II \I 11 1 III 8 , E _HL___ .1 .t(1( J t 9 i CI .AL V ,� It U I III O 2 alwWWW O co N m v co rn o L J V r n n n n N O W m L o � ❑ g -o ^ oro * � CD N Nr g o moo _ 2 (f7 L Q V V fn Q In n In m N r 1` a, CO N -o . ) \J N o � ccooir) a t (nov 0 N `OU UNN Y ORIGINAL ConocoPhilhi s Alaska ConocoPhillips(Alaska) Inc. Kuparuk River Unit Kuparuk 2Z Pad 2Z-23 2Z-23A Plan: 2Z-23A_wp03 Standard Planning Report 12 October, 2010 'flu BAKER HUGHES ORIGINAL ConocoPhillips .rr ConocoPhillips Planning Report BAKER Alaska HUGHES Database: EDM Alaska Prod v16 Local Co-ordinate Reference: Well 2Z-23 Company: ConocoPhillips(Alaska)Inc. TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 2Z-23 @ 112.00ft(2Z-23) • Site: Kuparuk 2Z Pad North Reference: True Well: 2Z-23 Survey Calculation Method: Minimum Curvature Wellbore: 2Z-23A Design: 2Z-23A_wp03 Project Kuparuk River Unit Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor I Site Kuparuk 2Z Pad Site Position: Northing: 5,966,526.92ft Latitude: 70°19'10.651 N From: Map Easting: 529,130.68ft Longitude: 149°45'49.854 W Position Uncertainty: 0.00 ft Slot Radius: " Grid Convergence: 0.22° Well 2Z-23 Well Position +N/-S 0.00 ft Northing: 5,966,062.01 ft • Latitude: 70°19'6.069 N +EI-W 0.00 ft Easting: 529,376.25 ft • Longitude: 149°45'42.741 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 71.00ft • Wellbore 2Z-23A Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2010 12/20/2010 16.90 79.84 57,348 Design 2Z-23A_wp03 Audit Notes: Version: Phase: PLAN Tie On Depth: 7,500.00 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction ! (ft) (ft) (ft) (0) -71.00 0.00 0.00 330.00 10/12/2010 2:25:20PM Page 2 COMPASS 2003.16 Build 69 ORIGINAL l.' � ConocoPhillips /G" anocoPhdllips Planning Report BAKER Alaska HUGHES Database: EDM Alaska Prod v16 Local Co-ordinate Reference: Well 2Z-23 Company: ConocoPhillips(Alaska)Inc. TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 2Z-23 @ 112.00ft(2Z-23) Site: Kuparuk 2Z Pad North Reference: True Well: 2Z-23 Survey Calculation Method: Minimum Curvature Wellbore: 2Z-23A Design: 2Z-23A_wp03 Plan Sections Measured TVD Below Dogleg Build Turn Depth Inclination Azimuth System +N/-S +E/-W Rate Rate Rate TFO (ft) (°) (°) (ft) (ft) (ft) (°/100ft) (°/100ft) (°/100ft) (°) Target 7,500.00 40.81 263.12 5,787.28 -330.87 -4,383.03 0.00 0.00 0.00 0.00 7,510.00 41.06 262.94 5,794.83 -331.66 -4,389.53 2.76 2.50 -1.80 -25.32 7,530.00 49.06 262.94 5,808.95 -333.40 -4,403.57 40.00 40.00 0.00 0.00 7,560.00 59.56 262.94 5,826.42 -336.39 -4,427.72 35.00 35.00 0.00 0.00 7,630.00 81.29 275.05 5,849.81 -337.06 -4,493.13 35.00 31.05 17.30 30.00 7,750.00 51.74 308.26 5,898.23 -301.04 -4,593.75 35.00 -24.62 27.68 140.00 7,940.15 90.00 7.81 5,964.75 -142.37 -4,645.39 35.00 20.12 31.32 70.00 8,000.15 90.32 346.81 5,964.58 -82.77 -4,648.18 35.00 0.54 -35.00 270.90 8,250.15 90.32 336.81 5,963.18 154.44 -4,726.11 4.00 0.00 -4.00 270.00 8,450.15 83.91 329.13 5,973.27 332.16 -4,816.73 5.00 -3.21 -3.84 230.00 8,650.15 87.55 319.79 5,988.19 494.21 -4,932.55 5.00 1.82 -4.67 291.00 8,750.15 89.25 316.16 5,990.98 568.45 -4,999.46 4.00 1.69 -3.63 295.00 9,050.15 90.01 304.19 5,992.92 761.63 -5,228.26 4.00 0.25 -3.99 273.60 9,275.15 91.57 295.32 5,989.80 873.17 -5,423.37 4.00 0.69 -3.94 280.00 9,425.15 95.00 290.39 5,981.20 931.32 -5,561.30 4.00 2.29 -3.29 305.00 9,540.15 99.60 290.39 5,966.59 971.06 -5,668.19 4.00 4.00 0.00 0.00 9,715.15 93.85 286.37 5,946.10 1,025.79 -5,833.03 4.00 -3.29 -2.30 215.00 9,890.15 90.02 292.24 5,940.19 1,083.59 -5,997.99 4.00 -2.19 3.35 123.00 10,190.15 86.14 303.60 5,950.26 1,223.71 -6,262.45 4.00 -1.29 3.79 109.00 1 10,340.15 86.16 297.59 5,960.34 1,299.85 -6,391.21 4.00 0.01 -4.01 270.00 10,800.00 82.59 279.45 6,005.78 1,444.80 -6,823.16 4.00 -0.78 -3.94 258.00 10/12/2010 2.25:20PM Page 3 COMPASS 2003.16 Build 69 ConocoPhillips Fr ConocoPhillips Planning Report BAKER Alaska HUGHES Database: EDM Alaska Prod v16 Local Co-ordinate Reference: Well 2Z-23 Company: ConocoPhillips(Alaska)Inc. TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 2Z-23 @ 112.00ft(2Z-23) Site: Kuparuk 2Z Pad North Reference: True Well: 2Z-23 Survey Calculation Method: Minimum Curvature Wellbore: 2Z-23A Design: 2Z-23A_wp03 Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N/-S +E/-W Section Rate Azimuth Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°) (ft) (ft) 7,500.00 40.81 263.12 5,787.28 -330.87 -4,383.03 1,904.98 0.00 0.00 5,965,714.03 524,994.98 TIP • 7,510.00 41.06 262.94 5,794.83 -331.66 -4,389.53 1,907.54 2.76 -25.32 5,965,713.21 524,988.48 KOP 7,530.00 49.06 262.94 5,808.95 -333.40 -4,403.57 1,913.05 40.00 0.00 5,965,711.42 524,974.45 End of DLS 40 7,560.00 59.56 262.94 5,826.42 -336.39 -4,427.72 1,922.54 35.00 0.00 5,965,708.33 524,950.32 4 7,600.00 71.88 270.25 5,842.86 -338.44 -4,464.02 1,938.92 35.00 30.00 5,965,706.14 524,914.03 7,630.00 81.29 275.05 5,849.81 -337.06 -4,493.13 1,954.66 35.00 26.97 5,965,707.40 524,884.92 5 7,700.00 63.14 292.43 5,871.25 -321.87 -4,557.43 1,999.97 35.00 140.00 5,965,722.34 524,820.56 7,750.00 51.74 308.26 5,898.23 -301.04 -4,593.75 2,036.16 35.00 134.59 5,965,743.02 524,784.17 6 7,800.00 59.35 327.44 5,926.68 -270.52 -4,620.95 2,076.20 35.00 70.00 5,965,773.43 524,756.85 7,900.00 80.57 357.35 5,961.45 -182.23 -4,647.21 2,165.78 35.00 59.06 5,965,861.61 524,730.25 7,940.15 90.00 7.81 5,964.75 -142.37 -4,645.39 2,199.40 35.00 48.42 5,965,901.48 524,731.92 7 8,000.00 90.32 346.87 5,964.58 -82.91 -4,648.15 2,252.27 35.00 -89.10 5,965,960.92 524,728.92 8,000.15 90.32 346.81 5,964.58 -82.77 -4,648.18 2,252.41 35.00 -89.16 5,965,961.06 524,728.89 End of OLS 35 8,100.00 90.32 342.82 5,964.02 13.58 -4,674.33 2,348.92 4.00 -90.00 5,966,057.30 524,702.37 8,200.00 90.32 338.82 5,963.46 108.01 -4,707.17 2,447.12 4.00 -90.02 5,966,151.59 524,669.16 8,250.15 90.32 336.81 5,963.18 154.44 -4,726.11 2,496.80 4.00 -90.04 5,966,197.94 524,650.04 9 8,300.00 88.72 334.90 5,963.60 199.93 -4,746.49 2,546.39 5.00 -130.00 5,966,243.34 524,629.48 8,400.00 85.51 331.06 5,968.64 288.88 -4,791.84 2,646.09 5.00 -129.98 5,966,332.10 524,583.79 8,450.15 83.91 329.13 5,973.27 332.16 -4,816.73 2,696.02 5.00 -129.79 5,966,375.28 524,558.73 10 8,500.00 84.80 326.79 5,978.17 374.21 -4,843.05 2,745.60 5.00 -69.00 5,966,417.23 524,532.25 8,600.00 86.63 322.12 5,985.65 455.32 -4,901.01 2,844.82 5.00 -68.77 5,966,498.10 524,473.98 8,650.15 87.55 319.79 5,988.19 494.21 -4,932.55 2,894.28 5.00 -68.42 5,966,536.87 524,442.29 11 8,700.00 88.40 317.98 5,989.95 531.74 -4,965.31 2,943.16 4.00 -65.00 5,966,574.27 524,409.38 8,750.15 89.25 316.16 5,990.98 568.45 -4,999.46 2,992.02 4.00 -64.94 5,966,610.84 524,375.10 12 8,800.00 89.37 314.17 5,991.58 603.80 -5,034.60 3,040.21 4.00 -86.40 5,966,646.05 524,339.82 8,900.00 89.63 310.18 5,992.45 670.93 -5,108.69 3,135.39 4.00 -86.38 5,966,712.88 524,265.48 9,000.00 89.88 306.19 5,992.87 732.73 -5,187.28 3,228.21 4.00 -86.34 5,966,774.37 524,186.66 9,050.15 90.01 304.19 5,992.92 761.63 -5,228.26 3,273.72 4.00 -86.32 5,966,803.10 524,145.57 13 9,100.00 90.36 302.22 5,992.76 788.93 -5,269.97 3,318.22 4.00 -80.00 5,966,830.24 524,103.75 9,200.00 91.05 298.28 5,991.52 839.30 -5,356.33 3,405.02 4.00 -80.01 5,966,880.26 524,017.21 9,275.15 91.57 295.32 5,989.80 873.17 -5,423.37 3,467.88 4.00 -80.05 5,966,913.87 523,950.04 14 9,300.00 92.14 294.51 5,989.00 883.64 -5,445.90 3,488.20 4.00 -55.00 5,966,924.24 523,927.47 9,400.00 94.43 291.22 5,983.27 922.42 -5,537.88 3,567.78 4.00 -55.03 5,966,962.66 523,835.36 9,425.15 95.00 290.39 5,981.20 931.32 -5,561.30 3,587.20 4.00 -55.21 5,966,971.47 523,811.90 15 9,500.00 98.00 290.39 5,972.73 957.23 -5,631.01 3,644.49 4.00 0.00 5,966,997.11 523,742.10 9,540.15 99.60 290.39 5,966.59 971.06 -5,668.19 3,675.05 4.00 0.00 5,967,010.78 523,704.86 16 10/12/2010 2:25:20PM Page 4 COMPASS 2003.16 Build 69 fR ! riN i 1.-- ,, ConocoPhillips Vir ConocoPhiltips Planning Report BAKER Alaska HUGHES Database: EDM Alaska Prod v16 Local Co-ordinate Reference: Well 2Z-23 Company: ConocoPhillips(Alaska)Inc. TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 2Z-23 @ 112.00ft(2Z-23) Site: Kuparuk 2Z Pad North Reference: True Well: 2Z-23 Survey Calculation Method: Minimum Curvature Wellbore: 2Z-23A Design: 2Z-23A_wp03 Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N/-S +E/-W Section Rate Azimuth Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°) (ft) (ft) 9,600.00 97.64 289.01 5,957.62 991.00 -5,723.90 3,720.18 4.00 -145.00 5,967,030.51 523,649.08 9,700.00 94.35 286.72 5,947.18 1,021.49 -5,818.55 3,793.91 4.00 -145.21 5,967,060.62 523,554.33 9,715.15 93.85 286.37 5,946.10 1,025.79 -5,833.03 3,804.88 4.00 -145.45 5,967,064.87 523,539.83 17 9,800.00 92.00 289.22 5,941.78 1,051.69 -5,913.70 3,867.65 4.00 123.00 5,967,090.45 523,459.06 9,890.15 90.02 292.24 5,940.19 1,083.59 -5,997.99 3,937.41 4.00 123.15 5,967,122.02 523,374.66 18 9,900.00 89.89 292.61 5,940.19 1,087.35 -6,007.10 3,945.22 4.00 109.00 5,967,125.74 523,365.54 10,000.00 88.59 296.40 5,941.52 1,128.82 -6,098.06 4,026.61 4.00 109.00 5,967,166.84 523,274.42 10,100.00 87.30 300.18 5,945.10 1,176.17 -6,186.05 4,111.61 4.00 108.95 5,967,213.84 523,186.26 10,190.15 86.14 303.60 5,950.26 1,223.71 -6,262.45 4,190.98 4.00 108.81 5,967,261.08 523,109.68 19 10,200.00 86.14 303.21 5,950.93 1,229.12 -6,270.65 4,199.77 4.00 -90.00 5,967,266.46 523,101.46 10,300.00 86.15 299.20 5,957.65 1,280.80 -6,355.98 4,287.19 4.00 -89.97 5,967,317.80 523,015.94 10,340.15 86.16 297.59 5,960.34 1,299.85 -6,391.21 4,321.31 4.00 -89.70 5,967,336.71 522,980.64 20 10,400.00 85.67 295.24 5,964.61 1,326.40 -6,444.68 4,371.04 4.00 -102.00 5,967,363.05 522,927.07 10,500.00 84.86 291.31 5,972.87 1,365.78 -6,536.20 4,450.90 4.00 -101.83 5,967,402.07 522,835.40 10,600.00 84.07 287.37 5,982.52 1,398.74 -6,630.10 4,526.39 4.00 -101.51 5,967,434.65 522,741.38 10,700.00 83.32 283.42 5,993.51 1,425.12 -6,725.91 4,597.14 4.00 -101.13 5,967,460.66 522,645.48 10,800.00 • 82.59 279.45 6,005.78 • 1,444.80 -6,823.16 4,662.81 4.00 -100.69 5,967,479.95 522,548.16 TD 10/12/2010 2:25:20PM Page 5 COMPASS 2003.16 Build 69 OR !ORiciilo ConocoPhillipFri ConocoPhillips Planning Report BAKER Alaska HUGHES Database: EDM Alaska Prod v16 Local Co-ordinate Reference: Well 2Z-23 Company: ConocoPhillips(Alaska)Inc. TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 2Z-23 @ 112.00ft(2Z-23) Site: Kuparuk 2Z Pad North Reference: True Well: 2Z-23 Survey Calculation Method: Minimum Curvature Wellbore: 2Z-23A Design: 2Z-23A wp03 Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Northing Easting -Shape (0) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 2Z-23A t1 0.00 0.00 5,963.00 -166.87 -4,647.31 5,965,876.97 524,730.09 70° 19'4.414 N 149°47'58.342 W -plan hits target center -Circle(radius 1,320.00) 2Z-23A,AL1 Polygon 0.00 0.00 0.00 1,665.78 -6,808.43 5,967,700.97 522,562.03 70°19'22.421 N 149°49'1.448 W -plan misses target center by 5985.32ft at 10400.00ft MD(5964.61 TVD,1326.40 N,-6444.68 E) -Polygon Point 1 0.00 1,665.78 -6,808.43 5,967,700.97 522,562.03 Point 2 0.00 1,168.00 -5,584.22 5,967,208.03 523,788.06 Point 3 0.00 660.92 -4,800.10 5,966,704.07 524,574.08 Point 4 0.00 -132.52 -4,451.12 5,965,912.08 524,926.12 Point 5 0.00 -92.33 -4,238.95 5,965,953.10 525,138.11 Point 6 0.00 -397.11 -4,305.13 5,965,648.09 525,073.13 Point 7 0.00 -448.93 -4,610.36 5,965,595.08 524,768.14 Point 8 0.00 -284.42 -4,738.74 5,965,759.07 524,639.13 Point 9 0.00 521.12 -5,116.67 5,966,563.05 524,258.09 Point 10 0.00 822.24 -5,655.56 5,966,862.03 523,718.08 Point 11 0.00 1,332.20 -6,926.73 5,967,366.96 522,445.05 Point 12 0.00 1,665.78 -6,808.43 5,967,700.97 522,562.03 2Z-23A,AL1 fault 2 0.00 0.00 0.00 1,247.95 -5,589.90 5,967,287.95 523,782.06 70°19'18.322 N 149°48'25.876 W -plan misses target center by 5953.83ft at 9800.00ft MD(5941.78 TVD,1051.69 N,-5913.70 E) -Polygon Point 1 0.00 1,247.95 -5,589.90 5,967,287.95 523,782.06 Point 2 0.00 943.93 -5,594.07 5,966,983.95 523,779.08 Point 3 0.00 862.25 -5,679.40 5,966,901.95 523,694.08 Point 4 0.00 943.93 -5,594.07 5,966,983.95 523,779.08 2Z-23A t7 0.00 0.00 5,982.00 1,397.03 -6,625.46 5,967,432.97 522,746.03 70°19'19.780 N 149°48'56.101 W -plan hits target center -Point 2Z-23A,AL1 Hard Lin 0.00 0.00 0.00 1,167.92 -5,584.21 5,967,207.96 523,788.06 70°19'17.535 N 149°48'25.708 W -plan misses target center by 5952.04ft at 9800.00ft MD(5941.78 TVD,1051.69 N,-5913.70 E) -Polygon Point 1 0.00 1,167.92 -5,584.21 5,967,207.96 523,788.06 Point 2 0.00 1,664.70 -6,808.42 5,967,699.89 522,562.04 Point 3 0.00 1,331.12 -6,926.72 5,967,365.89 522,445.06 Point 4 0.00 1,664.70 -6,808.42 5,967,699.89 522,562.04 2Z-23A t8 0.00 0.00 6,006.00 1,444.82 -6,823.30 5,967,479.97 522,548.03 70°19'20.248 N 149°49'1.877 W -plan hits target center -Circle(radius 1,320.00) 2Z-23A t2 0.00 0.00 5,964.00 200.55 -4,746.89 5,966,243.96 524,629.08 70°19'8.027 N 149°48'1.254 W -plan hits target center -Point 2Z-23A t5 0.00 0.00 5,977.00 943.94 -5,594.09 5,966,983.96 523,779.06 70°19'15.332 N 149°48'25.992 W -plan hits target center -Point 2Z-23A t3 0.00 0.00 5,986.00 455.18 -4,900.91 5,966,497.96 524,474.08 70°19'10.530 N 149°48'5.753 W -plan hits target center -Point 2Z-23A t6 0.00 0.00 5,940.00 1,095.65 -6,025.56 5,967,133.97 523,347.05 70°19'16.821 N 149°48'38.586 W -plan hits target center -Point 2Z-23A,AL1 fault 1 0.00 0.00 0.00 859.54 -4,984.34 5,966,901.95 524,389.08 70°19'14.506 N 149°48'8.196 W -plan misses target center by 5938.96ft at 7500.008 MD(5787.28 TVD,-330.87 N,-4383.03 E) -Polygon- 10/12/2010 2:25:20PM Page 6 COMPASS 2003.16 Build 69 OR i6I AL �, ConocoPhillips Frill ConocoPhi1Iips Planning Report BAKER Alaska HUGHES Database: EDM Alaska Prod v16 Local Co-ordinate Reference: Well 2Z-23 Company: ConocoPhillips(Alaska)Inc. TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 2Z-23 @ 112.00ft(2Z-23) Site: Kuparuk 2Z Pad North Reference: True Well: 2Z-23 Survey Calculation Method: Minimum Curvature Wellbore: 2Z-23A Design: 2Z-23A_wp03 Point 1 0.00 859.54 -4,984.34 5,966,901.95 524,389.08 Point 2 0.00 455.17 -4,900.89 5,966,497.95 524,474.10 Point 3 0.00 474.10 -5,140.85 5,966,515.94 524,234.10 Point 4 0.00 455.17 -4,900.89 5,966,497.95 524,474.10 2Z-23A t4 0.00 0.00 5,993.00 747.41 -5,207.81 5,966,788.96 524,166.07 70°19'13.402 N 149°48'14.715 W -plan hits target center -Point Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name n n 4,242.00 3,362.28 9-5/8" 9-5/8 12-1/4 10,800.00 6,005.78 2 3/8" 2-3/8 3 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-5 +E/-W I (ft) (ft) (ft) (ft) Comment 7,500.00 5,787.28 -330.87 -4,383.03 TIP 7,510.00 5,794.83 -331.66 -4,389.53 KOP 7,530.00 5,808.95 -333.40 -4,403.57 End of DLS 40 7,560.00 5,826.42 -336.39 -4,427.72 4 7,630.00 5,849.81 -337.06 -4,493.13 5 7,750.00 5,898.23 -301.04 -4,593.75 6 7,940.15 5,964.75 -142.37 -4,645.39 7 8,000.15 5,964.58 -82.77 -4,648.18 End of DLS 35 8,250.15 5,963.18 154.44 -4,726.11 9 I 8,450.15 5,973.27 332.16 -4,816.73 10 8,650.15 5,988.19 494.21 -4,932.55 11 8,750.15 5,990.98 568.45 -4,999.46 12 9,050.15 5,992.92 761.63 -5,228.26 13 9,275.15 5,989.80 873.17 -5,423.37 14 9,425.15 5,981.20 931.32 -5,561.30 15 9,540.15 5,966.59 971.06 -5,668.19 16 9,715.15 5,946.10 1,025.79 -5,833.03 17 9,890.15 5,940.19 1,083.59 -5,997.99 18 10,190.15 5,950.26 1,223.71 -6,262.45 19 10,340.15 5,960.34 1,299.85 -6,391.21 20 10,800.00 6,005.78 1,444.80 -6,823.16 TD 10/12/2010 2:25:20PM Page 7 COMPASS 2003.16 Build 69 n�uelanlewro WELLBORE DETAILS:2Z-23A REFERENCE WFa6051M �� Project:KuparukRiver Uni ^° My,ee,.eae.21s1- Sit Kuparuk2Z Pad CourGuele(WE)R6rrare:WeY 22.13,True North WNC 2L21 s 5>lapu��T Parent o o MD 22.23 Ve1w t1V0)Reference:Mean Sea3.Tru r/'y���/���-y�'e Tie an MD:7600.00 Vedic. `W N`Va a r�li Welber*:22-290 Op Wat0010 Seclon(VS)Reference:Set-(O.MW,a03E) JkRI PM:2Z-29A_wp09(22-2122-ZSA) wOPAe'euisno Mmsuen Depth Reverence:u-n@nzoan(2Z-23) Cadleeon Method:M ornumGonave • 2011( 1/27.-230 � -T j . 7 -i- __L__, + I-.-- ---. -230 WELL DETALS:22-23 1600 �. �.. �. ON/-S r • i. Ground Level: 71.00 »FJ-W Northing Easti25 L6.0691 Longitude Slot I. 1 3D I ;. .... Sec MD Inc Axl 7VDSS 6M/-S 4E4W Slog "IT ace VSec Target Annofalon - 0.00 0.00 5966062.01 529376.25 70°14 6.069 N 149 45'42.741 W 'b- - 0 SECTION DETAILS ANNOTATIONS 14(b 1 7500.00 40.81 263.12 5787.28 -33007 -4303.03 0.00 0.00 190498 TIP I 2 751000 41.06 262.94 5794.83 -331.66 4300.53 2.76 -25.32 190754 KOP ^I _.__.. 7 .. _.3 7530.00 49.06 262.94 5808.95 -33340 -440357 40.00 0.00 191305 End ofDLS 40 - 4 7560.00 59.56 262.94 5826.42 -33639 -4427.72 35.00 0.00 1922.54 4 P 6 5 783000 81.29 275.05 5849.81 -337.06 -4496.13 35.00 30.00 1954.86 5 0=6 0 4 -4- - I - 6 7750.00 51.74 30826 5898.23 301.04 -4593.75 35.00 140.00 2036.16 6 8 ,'1 I 7 7940.15 90.00 7.81 5964,75 -14237 -4645.39 35.00 7000 2199.40 7 v, 1 -. j.-.- -1 - _ �` - 8 8000.15 90.32 346.81 5964.58 -62.77 4648.18 35.00 27090 2252.41 End ofDL035 9 8250.15 90.32 336.81 5963.18 154.44 -4726,11 4.00 27000 2406.80 9 v ' 10 8450.15 83.91 329.13 5973.27 332.16 4816.73 5.00 23000 269602 10 .c It 11 8650.15 87.55 319.79 5988.19 49421 4932.55 5.00 29100 289428 11 c 12 8750.15 8925 316.16 5990.98 566.45 -4999.46 400 29500 2992.0 12 211 I • 13 9050.15 90.01 304.19 5992.92 761.63 -522826 4.00 27360 3273.72 13 14 9275.75 91.57 29532 5989.80 873.17 -5423.37 400 280.00 3467.86 14 ! 15 9425.15 95.00 29039 598120 931.32 -5561.30 4.00 30500 358720 15 'w 0 16 9540.15 99.60 29039 5966.99 971.06 -5668.19 4.00 000 3675.05 16 0 Bad°iD1935- 17 9715.15 93.85 28637 5946.10 1025.79 5833.03 4.00 21560 3804.86 17 44-211 I I - I i 18 9890.75 9092 29224 594019 1083.59 -5997.99 4.00 123.00 3937.41 18 ----- 19 10190.15 86.14 303.60 595026 1223.71 -6262.45 4.00 10900 4190.98 19 • ,-_ I 1 _-+_ i 20 10340.15 86.16 297.59 596034 7299.85 -639121 4.00 270.00 4327.31 20 I ' 2 ��� 1 5 4 21 1080000 82.59 279.45 6005.78 1444.80 582316 4.00 25800 4662.81 TD ! 22- 9.223; I 0/61P, ' PO4 0M3L8 40 .. . .. . ....i... ... ....I.. 1.. - .0005000 -7200-7000-6600 x600-6900 62110 5000-S6W-5600-59W-5200-5000-4600-0600-0400-42(10-0(KK/-3800 i i West(-)/East(+)(200 ft/in) I 551. I 5600SII I I spar o sa�rnLsw G ' M1lal OaA urblA 3f IO 11 12 13 ]4 IS is X17 1$ 9 20 _. �- �.. 6(x10 \ , _. _.-r-- -.. t 1 f 2.2I2Z-230 'u m 6204 -.. 1 -- I • 1 -. I l I i 1 f II 1 1 --LHl I01. rt 6 r1 1'_- .�.. L r I - I t i , 6600[-.f ... :,-rte. ._.-.+ ..- 1- .. .-.-.... 3200 4: --F I. -706 26W 2'X10 3 T .,6 90046 -..-.-:.- . . .-.-f.W... 14W 15W 1600 17W 16W 1900 20W 21W 2200 23-41 24110 25W 26W � 000 31W 3200 3000 3400 35W 3600 37W 36-41 39W 9000 41W 4240 43W 44W 4300 4ti00 4700 9606 4W0 50(10 5106 52W Vertical Section at 330.00°(100 ft/in) Project:Kuparuk RkwUnit A' ups h�1. Sil WELLBORE DETAILS:22-23A CoKdUaTbk �t• Kuparuk22 Pad ,,y„KF Parent Wellbore:2Z-23 a3'ele,NE)Itdererce:V#1 22-23.NueMNall, Wolk 22.23 ems.....r Ta on MD-)500.00 W4ctl(P,$)Rd �.zz-z3@++2-omt+2-zit NKY�NES /''�.�.,,,��" • • w IEan:22-234 491510 so.er - Seden(VS)Reference 9d Isom.00(2 WINf.VI-(�{l'{�,)$ Pem 2223Awp03(22-24122-234) m'"a�a,0 Mr03313 Deem Reference:Y-23011zm1(22 Cicld MdME:!Amman Curvdve 311 ... .. 1 tI �_ .... 1'7 / , I 2400 . 12 23L2A11 -V`---� w �1 O { , .x'-03 i _I t 1 -l „ ! _22 1 I I � .I..-,I—.. I i, is —., , .I. .!. �. :i .;_ -9400-9zm-9000-aero-aero-aom-azm-am0-Txoo a600-7400-nm-Tow-awo-acro smo ozro.afro-sem sauo-sem-szm.soon aam-0mo aaoo dzoo.a000 aero aero-3aoo-3zm-3000-zaw zmo zaw-2200 2Z-23 5112.00a(2Z-23) West(-)/East(+)(200 ft/in) OR ! GINA L ConocoPhillips e' ' ConocoPhillips Travelling Cylinder Report BAKER HUGHES Company: ConocoPhillips(Alaska)Inc.-Kup2 Local Co-ordinate Reference: Well 2Z-23 Project: Kuparuk River Unit TVD Reference: 2Z-23 @ 112.00ft(2Z-23) Reference Site: Kuparuk 2Z Pad MD Reference: 2Z-23 @ 112.00ft(2Z-23) Site Error: 0.00ft North Reference: True Reference Well: 2Z-23 - Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore 2Z-23A Database: EDM Alaska Prod v16 Reference Design: 2Z-23A wp03 Offset TVD Reference: Offset Datum Reference 2Z-23A_wp03 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of referen Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 7,500.00 to 10,800.00ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,275.90ft Error Surface: Elliptical Conic Survey Tool Program Date 10/12/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 60.00 7,500.00 2Z-23 GyroData(2Z-23) GYD-CT-CMS Gyrodata cont.casing mis 7,500.00 10,800.00 2Z-23A wp03(2Z-23A) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name C') (") 4,242.00 3,474.28 9-5/8" 9-5/8 12-1/4 10,800.00 6,117.78 2 3/8" 2-3/8 3 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) Kuparuk 2X Pad 2X-15-2X-15-2X-15 10,465.88 8,390.00 1,242.24 322.17 936.28 Pass-Major Risk 2X-16-2X-16-2X-16 10,000.00 8,825.00 1,173.57 311.13 868.20 Pass-Major Risk Kuparuk 2Z Pad 2Z-03-2Z-03-2Z-03 7,524.49 7,925.00 898.95 246.26 758.16 Pass-Major Risk 2Z-14-2Z-14-2Z-14 Out of range 2Z-16-2Z-16-2Z-16 Out of range 2Z-23-2Z-23-2Z-23 7,500.00 7,500.00 0.00 0.23 -0.22 FAIL-No Errors 2Z-23-2Z-23AL1 -2Z-23AL1_wp01 8,100.00 8,100.00 0.00 0.34 -0.22 FAIL-No Errors CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 10/21/2010 2:31:42PM Pae 2.of 11 COMPASS 2003.16 Build 69 Nabors CDR-2AC Kuparuk Managed Pressure Coil Tubing Drilling BOP Configuration for 2" Coil Tubing Lubricator I .1 Riser Annular Blind/Shear 2" Pipe/Slip(CT) Pump into Lubricator ��J L above BHA rams ►>/� /\>- 1 T Choke 1 2-3/8" Pipe/Slip(BHA) Choke Equalize Manifold 2-3/8" Pipe/Slip(BHA) Kin ►>O> L><L L 1 1 Blind/Shear 2" Pipe/Slip (CT) Choke 2 i Swab Valves MIL Wing Valves 44 4i Tree Flow Cross (> Surface Safety Valve BOPE: 7-1/16", 5M psi, TOT �� CC Choke Line: 2-1/16", 5M psi (> Master Valve Kill Line: 2-1/16", 5M psi �� CC Equalizing Lines: 2-1/16", 5M psi Choke Manifold: 3-1/8", 5M psi Riser: 7-1/16", 5M psi, CO62 Union ORIGINAL OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME ric.t%'� (, PTD# 2_10 1. 7 Development ✓ Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: t.' < Lt c e (_;c4- POOL: f� ?`�c t �° �' L '(,-)-� / Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 I To co co 0 a) a (a cn Q) O O ID ui7 ° a) _ C yr Q _c 0 a) 0 a II 0) con E O n o c 0 I- ` Co () `o a) p o U �_ E vi L 2 a 3 _ L .3 w 0 c 3 = -0 co o Z •c a) c v0) 0o92 a c° 0 3 0 = c a .5 M c 2 N C ca 2 D '0 C L6 0c p) 5 c—° a°) o O) 0 X 0 _ �. C Ln •O '0 CO C ° O 0 -2 O a) o E .c N' CO CO J 0 .0 (0 O 0- �, 'y. E ' E. -c 0 N U) p ` N. • a a 0 a a) ° C o c .N c > ° L� m 3 E a) N c U U) 0 3 c a a)tii 0 o Loon E a m U Z m a co 3 c°i ▪ o o as o a o '0 0 'a s c N o0 - o a) a Ln ` c n o aa) > c 0 a 3 aa> N M ") Q z a o o a0 o w n °) 3 X � ti3> 0 U) a) U M C N N ) N - LOn 0 m 3 N 'O o U) No O m N .� O N O N Q E O M ° N U N > ° > o C �c N m c c o a ti) U) m 3 N c n -J _ N U M N C C 't _ co a) a Q eL a0 Z o co Q N .- E o) a cn n m N a y co Q o a w E YC. - C a �' N' N N a) O) U) _c (� ar cn U •N LC a) c 'p Co N c co 0 c 0 n 0 a CO 0 -0 c N o m 0) v, a) 3 m c C -o, O 'o �, 0 0 < Z c. �. (0 c c Co c •O co q O. O O Co D. 2) CO. 0 U ai O a) > N co N 0 - a) c c (n O a E ° Cl) O) a) E a) C �. CO Co C -0 a co c M N p U) •c C a) Y Co . Cl) N - O 0 0 O a N > N O �� N 0 CO 7 0 Z 2 2 aa) -Q0 cco 3 7 cp) U U 0 0- Ln E 0 o 'o a C •N E U 0 C N Q a co C r c 't •tt "O N a) co •'x L x N cn 0) X O_ N vm) • Z O ° O O O X >a) O ° ° ° = O O 2 N fO Q N O N X •- Q W Y U Q N > U Q) cn a 0 E M a 2 = < x w -o a o a a w a) o a U) U) U) U) U) N U) U) U) N N U) CO) U) U) U) U) U) U) CON U) U) U) U) \ n z >- r >- >- >- >- >- >- >- >- >- >- >- >- z Z z z Z Z >- >- >- >- >- Z >- >- >- >- >- >- >- z >- z z z ' l co T i- o Co 0 N Zs, co U -c-ii o TO Uci E E 3 - E a) O 0 O Z c N a) V) C 0It O O O U'- O a O a >, w c a�, coc ..c o - It o o m 0 - -�0 3 E N 3 0 M a) U • U C c Z O c •> Lo O f6 a O w o a) E o c6 O coco a N) O` E N O o O O cn a v -0 o '5 O O •N U a a) U LL N x N as D r Q c O Q U) U N O) a) a) m n > w c q .� IhHI 0 o ° o a a) o a iY O w > ° 0 fo co a U --c m Z' U) @ ° 3 N. O u 'O O) -c o?$ c U) j °6 .2 to 3 Q U) U) a) N Cr) •/ • Z a` 0 c -0 0 a) C 7) CO U). fl, •_ n 0 a) m 0 o coa) a r C c c p E E a C C E @ a o co c c w > F _ c 2 - 0 a> cc c 0 t co a o r a m e Q Ytr, 2 2 0 a m °) N o o Q o ° 0) ° U a ° o o m a � -a 3 2 > co ' ,->� 'EA a Q .Q 7 a) Cl) ' .0 >, O ° 7 "O Co O Y O p o a) O EC 11) co @ @ QQ (6 (� O 0) O a) C Nom. o 0 0 0 _o o 0 a) c - Z o E ° 3 a`) o Cl) t Co 3 _ a) . EC � Q °) E a o@ m m R. w Q CO ns ° N 0 ns •c m @ _co t o o co o n 3 0 o 3 °c)E O m e a'i w .CO a a m 3 a°) aa) a) - o -° v,—31-2 .- 3 c 2 o a a) v0i `) Q. '� co 0 3 m r m ° w U�J O a o CO C 'a > p a> .n -o >p CoO C > 2 o O C O' N �° N a O O) C 'O d U) a) a _ -p 0 .� m p a) a) E ,� 0 o o E m E s o_ a) N c ot3 J U) 0.a 0 0 a s a) a) a U 0 Q C V „s° OU a 2 Cl) a) - 0 a) 2 •O 2 E0) C OU N 0 C O C 0 "0 = p (o E O O O N a) N a U) U) O L .. 0 0) x CO -r13 7 ° O U) co Co a) 0 T '° 3 = c - N O a m a CO o CO c `Q_ a a) N > a) a) a) a) 3 c -0 co E c) 0• 0• a`) c c m - - a w c� o v o ° a) m >. a) O 0 a -0 r a) a) > rn a) 0 W c._) N - N N N @ o f c C --' N U C N Al 'O a O .N yD 3 0 co C O 4) (o N CO coE },, O m E 3 m m m m v v E m 3 -0 > 0 0 m ns _ a = c .0 Co CO 0 c z c 0 000 0 0 0 0 0 o c 0 a) o o CO -`o Co r - Ui a 3 o c0 o (ry O 0 ° 0 0 0 .5 .> ca 2 • a 0 — a p 0 > > 3 m Q a a) c w w Y c a E 0 ai U E CO Q - - - a) m m c - 3 c c t F F F .N o a) — a. o Q U �° ns c m a) 8 •c a) a) a) ° -° a Or a) a) co a) - 2 o o ° 2 2 ca 0 a). -o `0 C O O .c 0 a) a) co a) a) o c a J D cn w 0 0 a a U Q a z U cn U U U U Q '• Q 0 m m U 2 a a co U U Sal a O N M V LC) CQ h W °) O N M V Ln (° N W O O N M V to O r CO 0) EO ,- N M V in (0 r CO 0) N N N N N N N N N N C) C'') c`') c) C') M f'') f`') C) C) U o O O d, O .�,, CV O w ON U c N O c l6 (.0 Lo co LO o ii. O Ci N O N Cl N 0'yILI L-o + O c O O 0 O. N 'E c W o Q.E p c a -I O a U d co a Q Q w Q C9 Q