Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout216-068MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Friday, October 13, 2023
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Austin McLeod
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
ConocoPhillips Alaska, Inc.
CD5-02A
COLVILLE RIV UNIT CD5-02A
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 10/13/2023
CD5-02A
50-103-20737-01-00
216-068-0
W
SPT
7199
2160680 1800
1638 1640 1640 1640
10 12 13 13
4YRTST P
Austin McLeod
8/19/2023
MITIA
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:COLVILLE RIV UNIT CD5-02A
Inspection Date:
Tubing
OA
Packer Depth
380 2300 2260 2250IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitSAM230820161836
BBL Pumped:3.7 BBL Returned:3.7
Friday, October 13, 2023 Page 1 of 1
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg / DATE: Thursday, August 15, 2019
P.I. Supervisor �Q G [�I /(o� �� SUBJECT: Mechanical Integrity Tests
ConocoPhillips Alaska, Inc.
CD5-02A
FROM: Jeff Jones
COLVILLE RI V UNIT CD5-02A
Petroleum Inspector
See: Inspector
Reviewed By:
P.I. Supry
NON -CONFIDENTIAL Comm
Well Name COLVILLE RIV UNIT CDS-02A API Well Number 50-103-20737-01-00 Inspector Name: Jeff Jones
IDSA Num: miUJ1908141I1015 Permit Number: 216-068-0 - Inspection Date: 8/32019 '
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
*PTD
CDs-02A Type Inj iTVD 2199 Tubing 3153 9 0 3i5s
--a-- � —�
2160680 Type Test SPT Test psi soo IA 930 loo 080 2075
BBL Pumped. 2.2 �BBL Returned: 22 ' OA 450 X35 S 535
Interval arRTST P/F _ P ./
Notes: I well inspected, no exceptions noted.
Thursday, August 15, 2019 Page I of I
• S
Wallace, Chris D (DOA)
From: NSK Well Integrity Supv CPF3 and WNS <n2549@conocophillips.com>
Sent: Wednesday, October 25, 2017 6:05 PM
To: Wallace, Chris D (DOA); Loepp, Victoria T(DOA)
Cc: Senden, R.Tyler
Subject: CRU CD5-02A, CD5-04, and CD5-99A Water Flow in Conductors
Chris/Victoria,
CRU wells CD5-02A(PTD 216-068), CD5-04(PTD 215-072), and CD5-99A(PTD 216-122) have recently been noted as
having water flowing to surface through the surface casing by conductor annulus. CPAI suspects this water to be from
the same shallow source water that was encountered on CD5-313 (PTD 215-084),as well as other CD5 wells. We will
take initial samples for analysis and collect water at the wellhead to monitor the flow volume. Please let us know if you
have any questions or disagree with this plan.
Regards,
Rachel Kautz/Travis Smith
Well Integrity Supervisor,ConocoPhillips Alaska Inc.
Office:907-659-7126 Cell:907-943-0450
SCANNEit to ti ti r „
1
0 cc
CO CD al 0~a • . v
o oNw N s
J m • r M X a3
® cn C ti ~ Y U 2 > L
c� a, 0 3
c o
r` • W � 1a >- o (1
N 3 ° o v E v
C • M m 4-,1.
Okr, N O
co , (0 C Y -6
, O C c
,A. ° C T Q
. itp Q m o m v 0 6 m
J
ow w w v, VI
J0 0 0 v- C -C
c
C " ~ N N N O C
N P t0 0 +�
U u
• ~ 4-* U C O
C Q- Q L
0
w J J JC `7- U 42
} W W W in cu C
_Q > v
0 Q J J J y-
��`' I- Q Q Q a1 0 c w
0 a, o z z z aui r a) ° v
Q' LL LL LL cc C >
u > a; c
K 4 , , C
N L u
0 O z E a u v
U H O c ° r
Z . .- d 2
C ac U < aa.) a in a C a
�j R>>f vUi ..
i. E L. C O W a >
r0 @ W
g E. O '1 z 0 0 w
w E
PI U % c.7-' > U
rtU °
> 0 0.,a p v
e• os
fro O cvW.zy ,, o
J oci o
4t- 11)41 , LU
> > c
Z J J 11
° J _J W
O w > > J
iy J J J +22n -:,,:i_
O O J O'
W V o �_ o
pcv
w co M X cn .-
Imocc 0 0 0 E
W ..-- a o 000
C.) CI F N >
a O CI a
W Q 9
CC S o E 0
0 o u Q
N o 0 0
L M in �+ a
IN 0 0 0 •C — -
N N N N y� L L
N M t9 M C p a
R
o 0 o fLp u 0
01 0 0
ca C C N N N v d U U
O9 i oo d
C ,+'+ Y IQ7� wY OC - E E
4641 �� ~ `d d Q O N a-+ v c i i
E N E
Lpq
in 0 0 z 0 0 0
O▪ CO3 a a a F° F°-
• 2_\Le - °(125
• RECEIVED
ConocoPhillips NOV 10 2016
Alaska
P.O. BOX 100360 . GCC
ANCHORAGE,ALASKA 99510-0360
October 30, 2016
Commissioner Cathy Foerster
Alaska Oil & Gas Commission
333 West 7th Avenue, Suite 100S NtlECD AR i� LC1
Anchorage,AK 99501
Commissioner Cathy Foerster:
Enclosed are the spreadsheets with a list of wells from the Alpine field(CRU).Each of these
wells was found to have a void in the conductor. These voids were filled with cement if needed
and corrosion inhibitor, engineered to prevent water from entering the annular space. As per
previous agreement with the AOGCC,this letter and spreadsheets serves as notification that the
treatments took place and meets the requirements of form 10-404,Report of Sundry Operations.
The cement was pumped October 29th 2016. The corrosion inhibitor/sealant was pumped on
October 30th 2016. The attached spreadsheet presents the well name,top of cement depth prior to
filling,and volumes used on each conductor.
Please call Aaron Applehans or Roger Winter at 907-659-7506,if you have any questions.
Sincerely, •
Aaron Applehans
ConocoPhillips Well Integrity Field Supervisor
• • •
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations(10-404)
Alpine Field
Date 10/30/2016 CD5 PAD
Corrosion
Initial top Vol.of cement Final top of Cement top off Corrosion inhibitor/
Well Name API# PTD# of cement pumped cement date inhibitor sealant date
ft bbls ft gal
CD5-01 50103207360000 2160220 1.33' .17 bbl .66' 10/29/2016 5.1 gal 10/30/2016
a CD5-02 50103207370100 2160680 1' .1 bbl .66' 10/29/2016 5 gal 10/30/2016
/" CD5-03 50103207180000 2151460 1.08' .1 bbl .66' 10/29/2016 5 gal 10/30/2016
CD5-04 50103207110000 2150720 .875' .07 bbl .66' 10/29/2016 5.1 gal 10/30/2016
CD5-05 50103207120000 2150730 2.25' NA 2.25' 5/29/2016 18 gal 10/30/2016
CD5-07 50103207340000 2160040 1.42' .2 bbl 0.66 10/29/2016 5.1 gal 10/30/2016
CD5-08 50103207410000 2160510 4.75' .71 bbl 1.83 10/29/2016
CD5-12 50103207420000 2160520 2.58' .47 bbl 0.66 10/29/2016 5 gal 10/30/2016
CD5-315 50103207160000 2151370 1' .1 bbl 0.66 10/29/2016 5.1 gal 10/30/2016
CD5-21 50103207380000 2160310 .75' .6bbl 0.66 10/29/2016 3.4 gal 10/30/2016
• •
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday,July 11,2016
TO: Jim Regg
P.I.Supervisor 1 7i 7/1 3/j p SUBJECT: Mechanical Integrity Tests
lC CC CONOCOPHILLIPS ALASKA INC
CD5-02A
FROM: Guy Cook COLVILLE RIV UNIT CD5-02A
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry
NON-CONFIDENTIAL Comm
Well Name COLVILLE RN UNIT CD5-02AAPI Well Number 50-103-20737-01-00 Inspector Name: Guy Cook
Permit Number: 216-068-0 Inspection Date: 7/6/2016
Insp Num: mitGDC160707175050
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well CD5-02A Type Inj W 4VD 7199 Tubing 1442 _ 1443 - 1443 - 1443 -
PTD 2160680 - Type Test SPT Test psi 1800 - IA 540 2500 - 2465 - 2465
Interval INITAL P/F P OA 252 288 282 280 -
Notes:
SCANNED NOV 2 22016
Monday,July 11,2016 Page 1 of I
• •
. , ,, —o
9 U) co
—
n w m co co I.
co
n a) 1 \ .....,
N 0 0 0 0 0 0 0 • • o
NI N 00 00 00 U a) 0 4) a) U) a) a) a) `)
>11
I I I a a a. a a a a a O
�o Q . Q � Q . Q � o N o8 E o N o f 8 N o f 0 0 a >
co (1 I d 1 d 1 a-- u)— CO '.' CO= U Y U)— U " N u)
in 1 1 0 0c 0u) 0u) 0u) Cc? 1L I•° Ir Ili IL 1 1
o f
Q 5 Q Q Q ,— Q ,- aM aM Q4 Q4 Q < �1 w
o o f o f N 0 (Ni 0 N 0 N 0 N 0 (N 0 N N
Z E I E I E I E I 00 00 00 00 00 o0 0 0 0
Z m� cad cod cad ui0 �0 �0 �O ui0 61216— 62 1
F. co a) amcce _ ce _ ce _ ce oooooo0 .T o E O
N
4 y o T OC)--I OJUJ UJ 0-I 0J U= U
LL T w it w> �t 1 1 I I I 1 1 I I 1 I I 1 • I • I'='
c co
w _ _ _ _ _ _ _ _ _
c 2
0 o O Un •0 u).0 u).0 u)•0 0 1 U 1 U I O 1 U I U 1 U 1 U U.N
N v) m V) u) u) w co co co co coU
Q C w.. O o �6 0 �0 o y6 0 0
V 0 o C 63 Ce mCt 63 CL ay Ce �0 a)0 •m0 a)0 °)0 a)0 m0 a)0 a)�1
Z r o 0 o 0 o O o 0 a) LL I LL 1 LL 1 LL 1 LL- 1 �t I �t I �t I LL o
o Eon oa 0a oa oo > 0 >, u >, o >, o > o > 0 > 0a
' ''.,, d E -50 'C c) co co C > .0 > C > 'C > 'C '> c > C > c > co
o ou) ou) oU ou) o• o o= o = o• o• o = o ou)
co
co
o V I in n in in in u) in in 1
Ce4 Un J 0 Q 0 Q 0 Q 0 Q 0'm 0'7n 0'rn 0'N 0'7n 0'rn 0 '�n 0 'gin 0 Q
LL J O N O N O N o N 0 0 0 0 0 0 0 0 0 0 o a) 0 0 0 0 O N
Q !, E EDEl C5 ED Ci a] ZSrt wot ED rt di or wot wot CO rt 6] co
Oo. 3 I c v 0 co m oo co co co co co to co co ca
a Y 0 0 0 0 0 0 0 0 0 0 O. 0
J (6 N N N N N N N N N N N N N
W = V O O O O O O O O O O O O O
Ce p m co co co co m cD co co co co cfl co- co
v
W z Z •
U i
N o �
N w to N N %— N N
J o \ z
5 C V COco
N a) u) N N
CO
OV a)
r E o- r
0
O 0 m c o
J N co fY Z a'
Q C d
0 r6 c.
�- co
— O o
S Z o w2
G > N
COCV co To
N
Z LC)
WU
Cn w 0
J 0 I8
Q OO J C
r o
a 2co
QZ O o
Q
d 0 OD w
E J it-
co Ur
Z
2 r0 @ co co as ca co c6 @ co co ro r6
o o N @ co co co co co co @ co co as co
co c E 0 0 0 0 0 0 0 0 0 0 0 0 0
n Z m m m m m m CO CO m m m CO ca
0 04 0) 0) 0) 0) a) _0) 0) _O) rn _0) 0) _m
0o Z 0 _ ` 0 0 0 0 0 0 0 0 0 0 0 0 0
co > 0 J o N N N N N N N N N N N N N
CO *. W 0) 0 0 0) 0) 0) 0) 0) 0) 0) 0) 0) 0)
o CO Q Z . C a) o 7 N N- r r CV N- n CV N- r N- r F-
N 2 O O O W o z N N N N N N N N N N N N N
O Q C E
LL £ �6 E
C)
Q o Z re w ��
c a
0
N r Z W c � 2 0 0 0 0 0 0 0 0 0 0 0 0 0
Q 0 J O
0 U' I— a 0+° 0. 0 0 0 0 0 0 0 0 0 0 0 0 0
a o I 3 -I0I--' w w w w w w w w w w w w w
• •
I coO
O • o
O • N N U Tr
—
M U) ' O a _a O O �i
c o ' w V •• J s 00_ S2 L U .0
o U w "-aa w 4-
-0 4 c 0 Z 'c 0 P2 Z O o c o f O O
a 2 W a E a N OW 0 E a 0 0 o o o 0 >,
6 2 I W 2 2 O 0 0 W
0�I > I �IWI > n 0 U
> > CO NNNN -0
CO CO m m CO ~(0 v CO CO
CO CO m CO Z °icocaaaE E E E
w
Z L6 fH o — ) 2 62 61— oH Z ZZZZZ ZZZZD ow NO =.0
_ ONI
IONIONIDOIDOODin, ‹t
IU T U T U T U T U TU T U T N Q Q Q Q Q
it N N N N N < < Q < >
N N N NC_ oU mU do
4- 0 •
I'= I=' I I'= I'= I'= I'= O w O O O O Ow O 0 O O LL t LL
O 0 O
7.Z a' Q•a Q•w Q.a Q•a Qa Qa to o• ui to to to 0 a to 6 ui to W a - a c
Z n_vn aN aN a� ao5 dv5 aN D • 0 0 0 0 0 0 0 0 0 - ago a) o
Q I0 U 0 U 7) 0 0 0 U g 0 0 0 U U g 0 0 0 U ; co o 00
uice ww occ ore ott o0 gitt o Z o o a) o o Z a) o o a) J m e is c 12 2
Z0
I I I I I I I 7 7 O O O
Z :LL N LL y IL 0. IL 0) Il 0) LL 0) LL N LL it I.L I1 LL co LL LL I1 6: 0 W E
1- o iC) 0 go g0 oo 0o 0o 0o 0o 0 o 0 0 oy 0 0 - 0 0� 0Q gQ 0
7 'c U •c U •c U E8 'c U C 0 •c U 'c N •c •C •c •C C D •C •c 'c _E C •c •c U
N m 2(0 20 2W 2W 2W O c 2(,) 2a 0 0 0 0 0 a O o O O i6 0 29 29 2.5
Q U) 0QI 0QI tQI tQI tQI tQI tQI ° E 0 0 0 0 0 E 0 a 0 0 oQ tin Dui 6 a
N co co _N _N 0 _N 0) 0 0) 0) o) 0) o) O 0 0 _N 0) _W _0 0 00 _0
W O O O W O W O W O W O W O W W LU W W O W LU LU LU N 2 W O W 0 W I-
O COO CO CO
CL U CO CO CO co co co OW O CO O CO CO CO CO CO CO
CL J O O O O O O O O O O O O O O O O O 0 O 0
J N N N N N N N N N N N N N N N N N N N N
LU = _O O_ O O_ O O _O _O O O O O O O O O_ O_ Tr
Ce a.
O CO CO Cfl t0 f0 CO CO CO Cfl CO Cfl (O f0 (O CO CO O O O
C) di
W z z Qy
V
Z LoQcn racol a
0 m
co
co
Tr Tr
J a @ '
am ° cn
c O N
5 G O 0O
N co
°�
0 a1
V0 M
O U 1 0
ra N
Q an c ro
r 0 a
5� coo
G Z N
CO > n
2 LO
W
''^^ J y
V/ J
5 0
Q - c
r 0)
Qo a
0 Z E
0
d 0 c
E oos
z co
co co c0 co co co co co co co t0 co m CO CO coo co N CO co ca
3 co co c0 o Co co N co m CO CO CO CO CO CO CO CO V CO CO co
v 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N 0 0 0
co co co co co a) co co co co co co co CO CO CO m 2 m (0 is
At C) C A. C) rn_ 0) rn a) .o .c rn 'rn 0 '0) '0) .5 5,o a C) rn
O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 J 0 0 0
O > N N N N N N N N NNNNN NNNNN M M M
o) 0) m o O O O O O) cn O D) O) O O O O d) O o) O
O N N N NN N N N N N N N N NNNNN N N N
ID N- n n n n n n n n n n N- n n n n N- n n n r--
V'
r N N N N N N N N N N N N N NNNNN N N N
N
EO 1
ai O_
O N N U
I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U
.� V.
O
N 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 p 0 0 0 d
a W W W W W W W W LU W LU LU LU LU LU LU W J W W W 1I
. •
o -
o 0
r 1 CA
UU U
n a) 0 0 0
o
U O O O V) a)
‘- X17 LC) LO t T � T
co
p
.�in 0 0 U c .
co cow coo a n-o a CO o Z`a rz r O li
r o t t o U dQ_Q o oC O7- O � O N 11_3 I
omO > > o o
Z c c o cc o U U �
00 0 >
II, di
QQ U 011
C. > a) . as N 0 W
z
Q oaa) g0E0 Baa)) m Q
'�0 'C 0 'C 0 E `�GJ lZ1 i .0•
.
w° o 2 2 E } (� > as
et JQ N WH WFO- WH 0 iiN
O _
//�� d co co COm a« n .16 m
Om _J ...'N N N E N E O) co
J 3
W = v v 'v co Z ai
ui
Ce 00.
Io 0 0 m m
C) 1 it E N 1
W ii. 0..
Z . °'
c m o
c) a
Co)
✓ N N II
Q o iii
° (0 rn
to
UJ J a C
J O
A 2
lCi cc) N U
U
G NO aE ,�
V o M
C w
o Q
0(NI }" II ) j E j M
Q v o c°� e
0 as I.
a
a
S E
• co rn o I
C Z N io @ c I
1 akiiiiir
G m
m
w r C al
Cl)V) J @ y 'V N c CUr I
J c
Q O c
o To i0
C) ro
a) c c o.
ao
as 0 1I
Q Z EO
1. III, I
0 li E U 5 M O I
z
CU CO CO CO CO I
N I
3I9 9 0 C Q N N
o Q o o E o thC
O T
0 I- 0) N N .
C W E c O N
CO N N N m 'i. W t O 'i N j d
a of ., a' O C F2 = N .>
E E Z m N a, °'
CG
EO Y N .) o w C
a. 0N as
dZ CF
Q O Z C CO O
Q O D :: •ivVC
UO N 0 0 0 0 aU J Na Cm o w a E oa n o 0 E Ia
E CE ° OooE E Od
aMwww3 LL U 2aad Z a c0 1 0 0 wp
0 1 0
2-1(0-v(06
RECEIVEUz1213
• OCT 13 2016
AOGCC
Schiumberger
13-OCTOBER-2016
Notice of Revision
Please find the enclosed revised SonicScope Top of Cement data for previously
drilled well CD5-02A. Revisions made reflect the corrected well name and
APIN for both graphics and data files.
Stephanie Pacillo
Schlumberger Petro Technical Services
STEPHANIE PACILLO SCIILUMBERGER ALASKA 6411 , Mit}EI'
ANCHORAGE,AK 99518 I EMAIL:SPACILLO(&,SLB.COM I 1)IR
907.273.1770 I FAX 907.273.4760
RECEIVES .272213
OCT 13201b
eblumberger AOGCC Transmittal#: 130CT16-SP01
Drilling & Measurements
MWD/LWD Log Product Delivery
Customer: ConocoPhillips Alaska Dispatched To: AOGCC: Makana Bender
Well No: T.O.C. CD5-02A **REV-1** Date Dispatched: 13-Oct-16
Job#: 15AKA0032 Dispatched By: Stephanie Pacillo
Well/
Product Hardcopy Digital Copy E-Delivery Date
Color Log Prints: N/A Contents on CD N/A
SonicScope Top of Cement x
11,925' - 14,900'
***Revised to reflect corrected name
and APIN ***
LAS Digital Data N/A Contents on CD
x
Directional Data N/A Contents on CD
As-Built Survey N/A Contents on CD
EOW CD -REV1 1 Contents on CD
Data: DLIS/ASCII x
Graphics: pdf x
Please sign and email a copy to: Please sign and email a copy to:
Tom.Osterkamp(aconocophillips.com AlaskaPTSPrintCenterslb.com
Attn: Tom Osterkam•, Attn:Stephanie Pacillo
91 - 63-4795
Received By: -- Q 1 cIN (lb_
RECEIVED
• STATE OF ALASKA 0 JUN 2 1 2016
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT ANIAMCC
la.Well Status: Oil❑ Gas❑ SPLUG❑ Other ❑ Abandoned ❑ Suspended ❑ 1b.Well Class:
20AAC 25.105 20AAC 25.110 Development ❑ Exploratory ❑
GINJ ❑ WINJ❑ WAGE . WDSPL❑ No.of Completions: Service IZ, Stratigraphic Test ❑
2.Operator Name: 6. Date Comp.,Susp.,or 14. Permit to Drill Number/ Sundry:
ConocoPhillips Alaska, Inc. Aband.: 5/27/2016 216-068
3.Address: 7. Date Spudded: 15.API Number:
P.O.Box 100360 Anchorage,AK 99510-0360 5/6/2016 50-103-20737-01-00 •
4a.Location of Well(Governmental Section): 8.Date TD Reached: 16.Well Name and Number:
Surface: 298 FNL,2459 FEL,Sec 18,T11 N, R4E, UM 5/22/2016 CRU CD5-02A
Top of Productive Interval: 9. Ref Elevations: KB:70.9 17.Field/Pool(s):
4899'FNL,4189'FEL,Sec 32,T12N,R4E,UM GL:34.1 BF: Colville River Unit/Alpine Pool
Total Depth: 10.Plug Back Depth MD/TVD: 18.Property Designation:
3595'FNL,2224'FEL,Sec 30,T12N,R4E,UM 22106/7346 • ASRC-NPRA2,ADL 388466 FEE-NPRA4
4b.Location of Well(State Base Plane Coordinates, NAD 27): 11.Total Depth MD/TVD: 19. Land Use Permit:
Surface: x- 349520 y- 5965910 Zone- 4 22106/7346 ' 932128,300634
TPI: x- 353251 y- 5977077 Zone- 4 12.SSSV Depth MD/TVD: 20.Thickness of Permafrost MD/TVD:
Total Depth: x- 350044 y- 5983725 Zone- 4 n/a 1340/1326
5. Directional or Inclination Survey: Yes ❑ (attached) No ❑ 13.Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD:
Submit electronic and printed information per 20 AAC 25.050 n/a (ft MSL) I n/a 2.14t2-4'/ 7,t`t I r-L
22. Logs Obtained: List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days
of completion,suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,
gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and
perforation record. Acronyms may be used.Attach a separate page if necessary
GR/Res/Sonic for TOC
23. CASING, LINER AND CEMENTING RECORD
WT.PER SETTING DEPTH MD SETTING DEPTH ND AMOUNT
CASING FT. GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED
20 78.6 B 37 115 37 115 42 10yds
10 3/4 45.5 L-80 37 2424 37 2189 13 1/2 Stage 1:921 sx 11 ppg
LiteCrete Lead Cement
Stage 2:285 sx 15.8ppg
Class G Tail cement
7 5/8 29.7 L-80 35 14695 35 7347 9 7/8 x 11 Stag 1:741 sx 15.8 ppg
Class G.Stage 2:286 sx
15.8 ppg Class G
24.Open to production or injection? Yes 0 No ❑ 25.TUBING RECORD
If Yes, list each interval open(MD/TVD of Top and Bottom; Perforation SIZE DEPTH SET(MD) PACKER SET(MD/TVD)
Size and Number): 4 1/2 14904 14049/7199
6.75"Open hole completion 14695-22106 MD,7347-7346 ND
26.ACID, FRACTURE,CEMENT SQUEEZE,ETC.
COMP ET!G`N
Was hydraulic fracturing used during completion? Yes❑ No I
`-ATE
Per 20 AAC 25.283(i)(2)attach electronic and printed information
5/Z?:/140 DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED
yE4RI lED
Lt,
27. PRODUCTION TEST
Date First Production: Method of Operation(Flowing,gas lift,etc.):
6/5/2016 GAS LIFT
Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio:
6/8/2016 6 Test Period En+324 832 181 128 Bean 100% 1125
Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr):
Press. 1Rf) nci 1480 osig 24-Hour Rate - 1295 3327 722 40
Form 10-407 Revised 11/ 5 �/7L 01 ' - Li>1' 14, CONTINUED ON PAGE 2 RBDMS L L JUN 2 2 2016 Submit ORIGINIAL onl
• •
28.CORE DATA Conventional Core(s): Yes ❑ No 2 Sidewall Cores: Yes ❑ No E
If Yes, list formations and intervals cored(MD/TVD, From/To),and summarize lithology and presence of oil,gas or water(submit separate pages with this form,
if needed).Submit detailed descriptions,core chips, photographs,and all subsequent laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS
NAME MD ND Well tested? Yes ❑ No 0
Permafrost-Top Surface Surface If yes, list intervals and formations tested,briefly summarizing test results.
Permafrost-Base 1340 1326 Attach separate pages to this form,if needed,and submit detailed test
Top of Productive Interval 14703 7348 information, including reports,per 20 AAC 25.071.
C30 2665 2323
K3 5968 3784
K2 6514 4015
Albian 97 7381 4387
Albian 96 10151 5567
HRZ(FCS) 13590 7026
HRZ 13757 7090
Kalubik 13934 7154
Kuparuk C 14305 7266
LCU/Miluveach 14314 7269
Alpine C 14703 7339
UJU 14717 7350
Formation at total depth: Alpine A '
31. List of Attachments: Daily Operations, Definitive Survey,Schematic
Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,
Paleontological report.production or well test results.per 20 AAC 25.070.
32. I hereby certify that the foregoing is true and correct to the best of my knowledge. / J ��/I�
Contact: William Earhart A 265-1077 Email: William.C.Earhart(a�cop.com lw.V4►.._
Printed Name: G.L.Alvord Title: Alalska Drilling Manager i
Signature: L Phone: 265-6120 Date: fl .1
I o
��� INSTRUCTIONS
General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram
with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.All laboratory analytical
reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted.
Item la: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
Item 1 b: Well Class-Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection,
Observation,or Other.
Item 4b: TPI(Top of Producing Interval).
Item 9: The Kelly Bushing,Ground Level,and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements
given in other spaces on this form and in any attachments.
Item 15: The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00).
Item 20: Report measured depth and true vertical thickness of permafrost.Provide MD and ND for the top and base of permafrost in Box 29.
Item 22: Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of
completion,suspension,or abandonment,whichever occurs first.
Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the
producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain).
Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Pursuant to 20 AAC 25.071,submit
detailed descriptions,core chips,photographs,and all subsequent laboratory analytical results,including,but not limited to:porosity,
permeability,fluid saturation,fluid composition,fluid fluorescence,vitrinite reflectance,geochemical,or paleontology.
Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31: Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and
other tests as required including,but not limited to:core analysis, paleontological report,production or well test results.
Form 10-407 Revised 11/2015 Submit ORIGINAL Only
WNS OD CD5-02A
ConocoPhillips Well Attribu Max Angle TD
Alaska,I11C, Wellbore API/UWI Field Name Wellbore Status nal(°) MD(ftKB) Act Btm(ftKB)
Can000Phttrpo ; 501032073701 ALPINE PROD 92.69 17,374.41 22,106.0
... Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date
CD5-02A,8/21/20169:24:02 AM SSSV: NONE Last WO: 36.81 5/27/2016
Vertical schemabc.(actual)
Annotation Depth(ftKB) End Date Annotation Last Mod By End Date
Last Tag: Rev Reason:GLV C/O,SET Al INJ VALVE pproven 6/19/2016
Casing Strings
Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread
HANGER;31.7 CONDUCTOR 20 19.124 36.8 115.0 115.0 78.60 B
Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread
SURFACE 10 3/4 9.950 37.3 2,424.0 2,189.3 45.50 L-80 Hyd 563
Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(I...Grade Top Thread
INTERMEDIATE 7 5/8 6.875 34.7 14,694.6 7,347.3 29.70 L80 BTCM
Casing Description OD fin) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(I...Grade Top Thread
OPEN HOLE 6 3/4 14,902.3 22.106.0 7,346.1
'Tubing Strings
Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft..'Set Depth(TVD)(...Wt(Ib/ft) Grade Top Connection
TUBING ORIGINAL 4 1/2 3.958 31.7 14,903.7 7,374.2 12.60 L-80 TXP
r' j' Completion Details
Nominal ID
Top(ftKB) Top(TVD)(ftKB) Top Incl F) Item Des Corn (in)
31.7 31.7 0.08 HANGER FMC 4-1/2"Tubing Hanger 3.958
2,145.9 2,004.7 44.27 NIPPLE Landing Nipple DB,4-1/2"X 3.813",L80,TXP BxP 3.813
14,048.9 7,199.4 71.57 PACKER Baker Premier Packer 4-1/2"TC-II x 7-5/8"29.7# 3.870
CONDUCTOR;36.8-115.0 14,077.5 7,208.3 71.85 NIPPLE Landing Nipple DB,4-1/2"X 3.75",L80,TXP B x TXP P 3.750
14,902.4 7,374.0 82.98 SHOE WLEG-Muleshoe type 4.000
Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.)
Top(TVD) Top Incl
VALVE;2,145.0 Top(ftKB) (ftKB) (^) Des Com Run Date ID On)
2,145.0 2,004.0 44.25 VALVE Al INJ.VALVE(SN:HRS-45) 6/18/2016 1.250
Mandrel Inserts
St
ati
N Top(TVD) Valve Latch Port Size TRO Run
Top(ftKB) (ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date Com
1 13,738.4 7,089.7 CAMCO KBMG 1 GAS LIFT DMY BK 0.000 0.0 6/17/2016
Notes:General&Safety
End Date Annotation
NOTE
SURFACE;37.3-2,424.0
GAS LIFT,13,738.4
XO-Threads;14,0388
PACKER;14,048.9
1 tt
XO-Threads;14,057.3
•
•
INTERMEDIATE;34.7-14,694.6
XO-Threads;14,895.5
XO-Threads;14,897.2
OPEN HOLE;14,902.3-22,106.0
perations Summary (with Timelog epths)
, lR y�'>r'K 1
g 3 CD5-02
conocoPhi111ps
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time` End Time Dur(hr)', Phase Op Code :Activity Code Time P-T-X Operation (ftKE) End Depth MMKE),
5/5/2016 5/5/2016 1.25 INTRM1 WHDBOP RURD T Install 5"Test joint and test plug. Fill 0.0 0.0
06:00 07:15 stack and manifold with water.Purge
air from system.
5/5/2016 5/5/2016 4.00 INTRM1 WHDBOP BOPE T BOPE Test:Annular to 250/2,500 psi 0.0 0.0
07:15 11:15 for 5 min each.Test upper and lower 3
1/2"X 6"lower VBR's to 250/3500 psi
for 5 min, Test manual!BOP, FOSV,
dart and choke valves#1 -14 and
needle valve above#1, Demco,HCR
Choke/Kill, Manual Choke/Kill on
stack to 250/3,500 psi for 5 min.
Koomey test;IP=3,000 psi,manifold
press after close=1500 psi,200 psi
recovery 31 sec,full recovery 178 sec,
N2-4 bottle average=2,530 psi.Test
blind rams to 250/3500 psi for 5 min.
Tested gas alarms,Draw down test on
manual and Super choke to 1,100 psi.
- Test waived by Johnny Hill of the
AOGCC.
5/5/2016 5/5/2016 0.75 INTRM1 WHDBOP RURD T Blow down Choke&Kill lines.RD 0.0 0.0
11:15 12:00 testing equipment.Pull test plug.Set
10.0"wear ring. Prep BHA tools and
equip.
5/5/2016 5/5/2016 3.75 INTRM1 PLUG BHAH T PJSM.MU RSS BHA#1 and MWD to 0.0 828.0
12:00 15:45 828'.
5/5/2016 5/5/2016 1.75 INTRM1 PLUG PULD T PU 5"DP from shed and RIH from 828.0 1,890.0
15:45 17:30 828'to 1,890'.Calc/Actual=28.87/
27.0 bbl.
5/5/2016 5/5/2016 1.00 INTRM1 PLUG SLPC T PJSM.Slip and cut 68'of drill line. 1,890.0 1,890.0
17:30 18:30
5/5/2016 5/5/2016 0.50 INTRM1 PLUG SVRG T Service rig-TD,Blocks and 1,890.0 1,890.0
18:30 19:00 Drawworks.
5/5/2016 5/5/2016 0.50 INTRM1 PLUG DI-IEQ T Shallow pulse test MWD with 500 gpm 1,890.0 1,890.0
19:00 19:30 and 1,050 psi-ok.
5/5/2016 5/5/2016 0.25 INTRM1 PLUG WASH T MU to Top Drive and wash down 1,890.0 2,118.0
19:30 19:45 from1,890'to 2,118'with 550 gpm,
1,220 psi and tag hard cement
5/5/2016 5/6/2016 4.25 INTRM1 PLUG DRLG T Drill cement kick off plug from 2,118' 2,118.0 2,328.0
19:45 00:00 to 2,328'with 550-650 gpm, 1,220-
1,360 psi,40-60 rpm and 6.5-8.5K TQ.
PU=130K,SO=115K,ROT=125K Ib,
TQ on/off=8.5K/5.6K at 2,328'.
SPRs-2,125'md,20:30 hrs,MW=
9.9 ppg
MP#1: 30-110, 40-140
MP#2: 30-110, 40-150
5/6/2016 5/6/2016 1.50 INTRM1 PLUG KOST T Drill cement kick off plug from 2,328' 2,328.0 2,424.0
00:00 01:30 to 2,424'with 600-550 gpm, 1,380-
1,170 psi,60 rpm and 6.5-9.0K TQ.
PU= 135K,SO=115K,ROT=125K lb
5/6/2016 5/6/2016 3.50 INTRM2 DRILL DDRL T Drill from 2,424'to 2,538'.(appear to 2,424.0 2,538.0
01:30 05:00 be kicked off at 2,427'but control drill
to move away from old wellbore)
5/6/2016 5/6/2016 1.00 INTRM2 DRILL KOST T PU to 2,522'and ream(trough)to help, 2,522.0 2,538.0
05:00 06:00 BHA drop inclination with 625 gpm,
1,350 psi,60 rpm and 4K TQ.
Page 1/18 Report Printed: 6/2/2016
• Operations Summary (with Timelog 57
AA'ADepths)
C D5-02
ConocoPhillips° z
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation fCK6) End Depth(ftKB)
5/6/2016 5/6/2016 6.00 INTRM2 DRILL DDRL T Drill from 2,538'to 2,652' /2,321'tvd, 2,538.0 2,652.0
06:00 12:00 ADT:8.67 hrs,ECD: 10.67 ppg,with
625 gpm, 1,740 psi,60 rpm
PU=135K,SO=115K,ROT=125K lb,
TQ on/off=4.5K/4.0K at 2,652'.
SPRs-2,611'md,10:15 hrs,MW=
9.9 ppg
MP#1: 30-90, 40-150
MP#2: 30-90, 40-150
5/6/2016 5/6/2016 1.25 INTRM2 DRILL DDRL T Drill from 2,652'to 2,705'.Check shot 2,652.0 2,705.0
12:00 13:15 survey to confirm kick off.
5/6/2016 5/6/2016 0.75 INTRM2 DRILL CIRC T Drop 1.25"activation ball and pump 2,705.0 2,678.0
13:15 14:00 down with 200-100 gpm,Ball went on
seat and tool sheared open at 1,020
psi. TRPM=586 decrease,pressure
decrease 400 psi. Reamed hole with
under-reamer from 2,673'to 2,678'.
Set down with 4K on bottom ledge and
Pull test with 3K lb against upper
ledge at 2,673' confirming 11"cutters
open.
5/6/2016 5/6/2016 1.00 INTRM2 DRILL DISP T Displace hole to 9.6 ppg LSND from 2,678.0 2,705.0
14:00 15:00 9.9 ppg LSND while under-ream hole
from 2,678'to 2,705'with 650 gpm,
1,550 psi,80 rpm and 4.7K TQ.
Change shaker screens,shut down
and clean under shakers.
5/6/2016 5/7/2016 9.00 INTRM2 DRILL DDRL T Drill ahead from 2,705'to 3,880'and/ 2,705.0 3,880.0
15:00 00:00 2,910'tvd, ADT:7.31 hrs, ECD: 10.95
ppg,775 gpm,2,130 psi, PU= 145K,
SO=120K,ROT=125K Ib, 180 rpm,
6.9/4.3K TQ, WOB=17K lb
SPRs-3,742'md,22:00 hrs, MW:
9.6 ppg
MP#1: 30-160, 40-200
MP#2: 30-160, 40-200
5/7/2016 5/7/2016 12.00 INTRM2 DRILL DDRL T Drill ahead from 2,705'to 5,684'and/ 3,880.0 5,684.0
00:00 12:00 3,665'tvd, ADT:8.96 hrs,ECD: 11.4
ppg,775 gpm,2,640 psi,PU=160K,
SO=125K,ROT=138K Ib, 180 rpm,
10.5/10.5K TQ, WOB=17K lb
SPRs-5,247'md,09:00 hrs,MW:
9.6 ppg
MP#1: 30-160, 40-220
MP#2: 30-160, 40-220
5/7/2016 5/8/2016 12.00 INTRM2 DRILL DDRL T Drill ahead from 5,684'to 7,320'and/ 5,684.0 7,320.0
12:00 00:00 4,360'tvd, ADT:8.22 hrs,ECD: 11.26
ppg,775 gpm,2,420 psi,PU=173K,
SO=135K,ROT=153K Ib, 180 rpm,
15.6K/6.7K TQ, WOB=35K lb
SPRs-6,471'md, 17:45 hrs
MP#1: 30-210, 40-250
MP#2: 30-210, 40-250
Page 2/18 Report Printed: 6/2/2016
•
*,< Operations Summary (with Timelog Depths)
orre
CD5-02
ConocoPhiiiips
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X L7perabon (ItKB) End Depth(EKE)
5/8/2016 5/8/2016 12.00 INTRM2 DRILL DDRL T Drill ahead from 7,320'to 9,111'and/ 7,320.0 9,111.0
00:00 12:00 5,129'tvd, ADT:8.85 hrs,ECD: 10.89
ppg,775 gpm,2,470 psi,PU=200K,
S0=1140K,ROT=168K Ib, 180 rpm,
17.0K/8.0K TQ, WOB=23K lb
SPRs-8,170'md,05:50 hrs
MP#1: 30-170, 40-220
MP#2: 30-170, 40-220
5/8/2016 5/9/2016 12.00 INTRM2 DRILL DDRL T Drill ahead from 9,111'to 10,955'and/ 9,111.0 10,955.0
12:00 00:00 5,908'tvd, ADT:8.07 hrs,ECD: 11.25
ppg,775 gpm,2,660 psi,PU=235K,
SO=150K,ROT=180K Ib, 180 rpm,
20.9K/14.5K TQ, WOB=31K lb
SPRs-10,895'md,23:15 hrs
MP#1: 30-350, 40-400
MP#2: 30-350, 40-410
5/9/2016 5/9/2016 12.00 INTRM2 DRILL DDRL T Drill ahead from 10,995'to 12,614' 10,955.0 12,614.0
00:00 12:00 and/6,620'tvd, ADT:8.59 hrs,ECD:
10.82 ppg,775 gpm,2,660 psi,PU=
265K,SO= 160K,ROT=192K Ib, 180
rpm,24.7K/13.0K TQ, WOB=32K lb
SPRs-12,302'md,09:30 hrs
MP#1: 30-280, 40-340
MP#2: 30-280, 40-340
5/9/2016 5/9/2016 1.25 INTRM2 DRILL DDRL T Drill ahead from 12,614'to 12,770' 12,614.0 12,770.0
12:00 13:15 md.
5/9/2016 5/9/2016 3.00 INTRM2 DRILL CIRC T Survey from 12,770'to 12,676'. Pump 12,770.0 ,
12
13:15 16:15 Hi/Low Vis sweep and 3X bottoms up
with 775 gpm,2,780-2,660 psi, 140
rpm, 18.9-21.1 TQ. PJSM for MPD
element installation.
5/9/2016 5/9/2016 0.25 INTRM2 DRILL OWFF T Flo-chk for 10 min-static. 12,676.0 12,676.0
16:15 16:30
5/9/2016 5/9/2016 0.25 INTRM2 DRILL TRIP T POOH from 12,676'to 12,645' 12,676.0 12,645.0
16:30 16:45
5/9/2016 5/9/2016 0.50 INTRM2 DRILL MPDA TPll Trip nipple and install MPD 12,645.0 12,676.0
16:45 17:15 element.
5/9/2016 5/9/2016 0.75 INTRM2 DRILL REAM T Wash/ream and break in MPD 12,645.0 12,676.0
17:15 18:00 bearing from 12,676'to 12,770'with
775 gpm,2,660 psi,50-140 rpm, 13.1
-18.2K TQ
5/9/2016 5/10/2016 6.00 INTRM2 DRILL DDRL T Drill ahead from 12,676'to 13,239' 12,676.0 13,239.0
18:00 00:00 and/6883'tvd, ADT:4.91 hrs,ECD:
11.34 ppg,775 gpm,3,020 psi,
WOB=40K lb
SPRs-13,051'md,22:00 hrs,BP-
285 psi
MP#1: 30-560, 40-610
MP#2: 30-560, 40-630
Page 3/18 Report Printed: 6/2/2016
,.� ` perations Summary (with Timelog!pths)
�., CD5-02
40
ccnacce illlps
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time End Time Dur(hr);, Phase Op Code Activity Code Time P-T-X Operation tftKB) End Depth(ftKB)'
5/10/2016 5/10/2016 12.00 INTRM2 'DRILL DDRL T Drill ahead f113,239'to 14,269'MD/ 13,239.0 14,269.0
00:00 12:00 7,257'TVD,ADT 8.46 hrs,ECD 11.36
ppg,775 gpm,3170 psi,PU 310 k,SO
157 k,ROT 202 k,Trq 26/18,RPM
160,WOB 20/25
5/10/2016 5/10/2016 7.50 INTRM2 DRILL DDRL T Drill ahead f/14,269'to 14,625'MD 14,269.0 14,625.0
12:00 19:30
5/10/2016 5/10/2016 1.00 INTRM2 DRILL CIRC T Circ w/800 gpm&confirm TD with 14,625.0 14,625.0
19:30 20:30 town geologist.
5/10/2016 5/10/2016 2.50 INTRM2 DRILL DDRL T Drill ahead f/14,265'to TD of 14,704' 14,625.0 14,704.0
20:30 23:00 MD/7,349'TVD,ADT 7.78 hrs,ECD
11.26 ppg,800 gpm,3700 psi,PU 310
k,SO 157 k,ROT 202 k,Trq 26/18,
RPM 160,WOB 25/27
5/10/2016 5/11/2016 1.00 INTRM2 CASING CIRC T Pump up final survey, L/D 1 single 14,704.0 14,704.0
23:00 00:00 joint.Circ clean w/800 gpm,3700 psi,
160 rpm,26 k trq,reciprocate full
stand.
5/11/2016 5/11/2016 14.00 INTRM2 CASING CIRC T Circ clean for 12+B/U w/800-850 14,704.0 14,704.0
00:00 14:00 gpm,3700-4000 psi, 160-180 rpm,
22-29 k trq,Reciprocate full stand.
5/11/2016 5/11/2016 0.50 INTRM2 CASING CIRC T Drop deactivation ball&close reamer. 14,704.0 14,704.0
14:00 14:30
Open=1550 psi&3476 trpm w/650
gpm
Close=1960 psi&2890 trpm w/650
gpm
5/11/2016 5/11/2016 7.00 INTRM2 CASING CIRC T Wt up f/10.0 ppg to 10.8 ppg w/700- 14,704.0 14,704.0
14:30 21:30 550 gpm,3340-2250 psi,50 rpm, 18
-20 k trq.Maintain 1.5 ppg ECD max
5/11/2016 5/11/2016 0.25 INTRM2 CASING OWFF T F/C(static) 14,704.0 14,704.0
21:30 21:45
5/11/2016 5/11/2016 0.25 INTRM2 CASING CIRC T Break circ w/525 gpm,2230 psi,50 14,704.0 14,704.0
21:45 22:00 rpm, 18 k trq.Line up MPD
equipment.
5/11/2016 5/12/2016 2.00 INTRM2 CASING SMPD T Strip OOH as per MPD schedule 14,704.0 13,518.0
22:00 00:00 f/14,704'to 13,518'
5/12/2016 5/12/2016 3.50 INTRM2 CASING SMPD T Strip OOH as per MPD schedule 13,518.0 10,053.0
00:00 03:30 f/13,518'to 10,053'(Tight hole @
9,931'¬ able to work through)
5/12/2016 5/12/2016 2.00 INTRM2 CASING CIRC T Circ B/U w/500 gpm, 1810 psi,80 10,053.0 9,959.0
03:30 05:30 rpm, 12 k trq.Rack back 1 stand to
9,959'
5/12/2016 5/12/2016 1.25 INTRM2 CASING SMPD T Strip OOH as per MPD schedule 9,959.0 9,871.0
05:30 06:45 f/9,959'to 9,871'Tight hole¬
making much head way.
5/12/2016 5/12/2016 2.00 INTRM2 CASING BKRM T BROOH f/9,871'to 9,600' w/500 gpm, 9,871.0 9,600.0
06:45 08:45 1750 psi,80 rpm, 14 k trq
5/12/2016 5/12/2016 1.75 INTRM2 CASING SMPD T Strip OOH as per MPD schedule 9,600.0 9,017.0
08:45 10:30 f/9,600'to 9,017'(Tight hole @ 9,017'
¬ able to work through)
5/12/2016 5/12/2016 3.00 INTRM2 CASING BKRM T BROOH(/9,017'to 8,451'w/550 gpm, 9,017.0 8,451.0
10:30 13:30 1900 psi,80 rpm, 12 k trq
5/12/2016 5/12/2016 1.25 INTRM2 CASING SMPD T Strip OOH as per MPD schedule 8,451.0 7,491.0
13:30 14:45 f/8,451'0 7,491 (Tight hole @ 7,491'&
not able to work through)
Page 4/18 Report Printed: 6/2/2016
"' 6. Ara !perations Summary (with Timelog Depths)
I
. „ , CD5-02
!
Ccirmaz:Whillips
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) Cod Depth(ftKt3)'
5/12/2016 5/12/2016 3.75 INTRM2 CASING BKRM T BROOH f/7,491'to 6,755'w/550-600 7,491.0 6,755.0
14:45 18:30 gpm, 1900-2010 psi,80 rpm, 12 k trq
5/12/2016 5/12/2016 1.25 INTRM2 CASING CIRC T Circ B/U w/600 gpm,2060 psi,80 6,755.0 6,755.0
18:30 19:45 rpm, 17.5 k trq.
5/12/2016 5/13/2016 4.25 INTRM2 CASING BKRM T BROOH f/6,755'to 6,264'w/600-650 6,755.0 6,264.0
19:45 00:00 gpm,2100-2500 psi,80-100 rpm,9
-12 k trq.(Tight spots @ 6,808'&
6,620'pipe hung up&had to work
free)
5/13/2016 5/13/2016 3.25 INTRM2 CASING BKRM T BROOH f/6,264'to 5,434'w/650 gpm, 6,264.0 5,434.0
00:00 03:15 2150 psi,80 rpm,8 k trq.ECD trends
increasing f/11.6 ppg to 11.8 ppg
5/13/2016 5/13/2016 1.25 INTRM2 CASING CIRC T Pump nut plug sweep&circ B/U 5,434.0 5,434.0
03:15 04:30 w/630 gpm,2150 psi, 150 rpm,8 k trq.
Saw a noticable increase in cuttings
on shakers
5/13/2016 5/13/2016 1.75 INTRM2 CASING SMPD T Strip OOH as per MPD schedule 5,434.0 2,799.0
04:30 06:15 f/5,434'to 2,799'.Tight hole @ 2,799'
¬ able to work through.
5/13/2016 5/13/2016 0.75 INTRM2 CASING CIRC T Circ B/U w/600 gpm, 1790 psi,50 2,799.0 2,799.0
06:15 07:00 rpm,3 k trq.
5/13/2016 5/13/2016 2.75 INTRM2 CASING BKRM T Attempt to pull on elevators with no 2,799.0 2,424.0
07:00 09:45 success.BROOH f12,799'to 2,424'
w/600 gpm, 1780 psi,50 rpm,3 k trq.
Pull in to 10 3/4"casing with no
rotation.Observed 10 k over pull when
pulling thru shoe.
5/13/2016 5/13/2016 0.50 INTRM2 CASING OWFF T F/C(static). PJSM on RCD bearing. 2,424.0 2,424.0
09:45 10:15
5/13/2016 5/13/2016 0.50 INTRM2 CASING MPDA T Remove RCD bearing&install trip 2,424.0 2,424.0
10:15 10:45 nipple.
5/13/2016 5/13/2016 1.75 INTRM2 CASING CIRC T Circ 2 B/U w/700-730 gpm,2200 psi, 2,424.0 2,424.0
10:45 12:30 130 rpm,3 k trq.Pumped 2 nut plug
sweeps to aid in hole cleaning.
5/13/2016 5/13/2016 2.00 INTRM2 CASING PMPO T Pump OOH f/2,424'to 1,481'w/730 2,424.0 1,481.0
12:30 14:30 gpm,2400 psi. Pump nut plug sweeps
to aid in hole cleaning.
5/13/2016 5/13/2016 0.25 INTRM2 CASING OWFF T F/C(static) 1,481.0 1,481.0
14:30 14:45
5/13/2016 5/13/2016 1.00 INTRM2 CASING TRIP T POOH on elevators on trip tank 1,481.0 185.0
14:45 15:45 f/1,481'to 185'
5/13/2016 5/13/2016 0.25 INTRM2 CASING OWFF T F/C(static).PJSM on BHA 185.0 185.0
15:45 16:00
5/13/2016 5/13/2016 1.75 INTRM2 CASING BHAH T L/D BHA as per SLB 185.0 0.0
16:00 17:45
5/13/2016 5/13/2016 0.75 INTRM2 CASING BHAH T Clean&clear floor of BHA tools& 0.0 0.0
17:45 18:30 equipment.
5/13/2016 5/13/2016 0.75 INTRM2 CASING WWWH T M/U stack washer&flush stack 0.0 0.0
18:30 19:15
5/13/2016 5/13/2016 0.50 INTRM2 CASING RURD T FMC pull wear ring. 0.0 0.0
19:15 19:45
5/13/2016 5/13/2016 1.50 INTRM2 CASING BOPE T C/O upper rams to 7 5/8"casing rams. 0.0 0.0
19:45 21:15 SIMOPS-M/U Volant tool&R/U bale
extensions&250 ton casing elevators.
Page 5/18 Report Printed: 6/2/2016
"l'1 ,'• Aerations Summary (with Timelog epths)
iiif
ComoicoPhillips .
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Tune End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (EKE) End,Depth(ttKE)',
5/13/2016 5/13/2016 2.00 INTRM2 CASING BOPE T Set test plug.R/U testing equip.Test 0.0 0.0
21:15 23:15 with 7 5/8"test jt.Annular 250/2500
psi&upper rams 250/3500 psi&chart
for 5 min.R/D testing
5/13/2016 5/14/2016 0.75 INTRM2 CASING RURD T R/U to run 7 5/8"casing.PJSM on 0.0 0.0
23:15 00:00 running casing
5/14/2016 5/14/2016 2.00 INTRM2 CASING PUTB T M/U shoe track&check floats(good) 0.0 246.0
00:00 02:00 RIH 7 5/8"29.7#L-80 BTC-M casing
to 246'
5/14/2016 5/14/2016 0.50 INTRM2 CASING SVRG T Service top drive 246.0 246.0
02:00 02:30
5/14/2016 5/14/2016 3.75 INTRM2 CASING PUTB T RIH 7 5/8"29.7#L-80 BTC-M casing 246.0 2,408.0
02:30 06:15 to f/246'to 2,408'(60 jts)
5/14/2016 5/14/2016 0.50 INTRM2 CASING CIRC T Circ B/U,stage pumps to 7 bpm @ 2,408.0 2,408.0
06:15 06:45 140 psi.SO wt 115 k
5/14/2016 5/14/2016 2.25 INTRM2 CASING PUTB T RIH 7 5/8"29.7#L-80 BTC-M casing 2,408.0 3,859.0
06:45 09:00 to f/2,408'to 3,859'(96 jts)Drag
trends deminishing
5/14/2016 5/14/2016 1.25 INTRM2 CASING CIRC T Circ B/U,stage pumps to 8 bpm @ 3,859.0 3,859.0
09:00 10:15 190 psi.SO wt 130 k
5/14/2016 5/14/2016 4.75 INTRM2 CASING PUTB T RIH 7 5/8"29.7#L-80 BTC-M casing 3,859.0 6,703.0
10:15 15:00 to f/3,859'to 6,703'(167 jts)
5/14/2016 5/14/2016 1.50 INTRM2 CASING CIRC T Circ B/U,stage pumps to 6 bpm @ 6,703.0 6,703.0
15:00 16:30 220 psi,SO wt 142k
5/14/2016 5/14/2016 6.50 INTRM2 CASING PUTB T RIH 7 5/8"29.7#L-80 BTC-M casing 6,703.0 10,021.0
16:30 23:00 to f/6,703'to 10,021'(250 jts)
5/14/2016 5/15/2016 1.00 INTRM2 CASING CIRC T Circ B/U stage pumps to 2.5 bpm @ 10,021.0 10,021.0
23:00 00:00 310 psi,PU wt 255 k(340 k max
break over)SO wt 150k
5/15/2016 5/15/2016 3.00 INTRM2 CASING CIRC T Circ B/U stage pumps to 4 bpm @ 250 10,021.0 10,021.0
00:00 03:00 psi,PU wt 250 k SO wt 150k
5/15/2016 5/15/2016 8.25 INTRM2 CASING PUTB T RIH 7 5/8"29.7#L-80 BTC-M&Hyd 10,021.0 13,168.0
03:00 11:15 563 casing to f/10,021'to 13,168'(328
jts)
5/15/2016 5/15/2016 0.25 INTRM2 CASING CIRC T Break Circ w/2 bpm @ 580 psi, 100% 13,168.0 13,168.0
11:15 11:30 returns.Attempt to work pipe&would
not break over(375-425k)Decesion
made to continue to run casing.
•
5/15/2016 5/15/2016 4.75 INTRM2 CASING PUTB T RIH 7 5/8"29.7#L-80 Hyd 563 casing 13,168.0 14,657.0
11:30 16:15 to f/13,168'to 14,657'(365 jts)
5/15/2016 5/15/2016 0.25 INTRM2 CASING HOSO T M/U hanger&landing jt. Land casing 14,657.0 14,694.0
16:15 16:30 on hanger @ 14,694'.SO wt 135 k
5/15/2016 5/15/2016 0.50 INTRM2 CEMENT RURD T B/D top drive. R/U cement valves& 14,694.0 14,694.0
16:30 17:00 hoses.
5/15/2016 5/16/2016 7.00 INTRM2 CEMENT CIRC T Circ&cond mud for cement job cut 14,694.0 14,694.0
17:00 00:00 mud wt f/10.8 ppg to 10.3 ppg.Stage
pumps up f/1 bpm @ 650 psi to 7 bpm
@ 700 psi.Full returns.No pipe
reciprocation. 10.3 ppg In/Out.
SIMOPS-L/D casing tools&equip,
work on MP2's,L/D 5"DP via tugger&
90'mouse hole.
5/16/2016 5/16/2016 1.75 INTRM2 CEMENT CIRC T Circ&cond mud for cement job w/8 14,694.0 14,694.0
00:00 01:45 bpm @ 700 psi.Full returns.No pipe
reciprocation. 10.3 ppg In/Out.YP 20.
SIMOPS-PJSM on cementing.
Page 6/18 Report Printed: 6/2/2016
s„ iterations Summary (with Timelog 6epths)
AttoTn
its �' CD5-02
Conoco Blips
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Lag
Start Depth
Start Time End Time Dur(hr); Phase Op Code Activity Code Time P-T-x Operation (ftKB) End';Depth(ttKB)
5/16/2016 5/16/2016 3.25 INTRM2 CEMENT CMNT P F/C(static.Line up to Dowell.Cement 14,694.0 14,694.0
01:45 05:00 1st stage as per Dowell. Flood lines&
pressure test to 4000 psi(good)
Dowell pump 47.3 bbls 12.5 ppg mud
push, 153 bbls 15.8 ppg Class G 1.16
ft3/sx yld cement,drop landing plug,
10.2 bbls H2O,displace w/663.89 bbls
10.3 ppg LSND,did not bump plug.
Pump an additional 1/2 shoe track for
666.69 bbls&did not bump plug.. ICP
6.2 bpm @ 150 psi/FCP 3 bpm @
900 psi.w/full returns.Bleed off
pressure&check floats(good)F/C
annulus(good).CIP @ 4:58 hrs
5/16/2016 5/16/2016 1.00 INTRM2 CEMENT RURD P R/D cement lines&R/D Volant casing 0.0 0.0
05:00 06:00 running tool.R/U to L/D 5"drill pipe.
5/16/2016 5/16/2016 5.75 INTRM2 CEMENT PULD P L/D 38 stands 5"DP&2 stands 0.0 0.0
06:00 11:45 HWDP via 90'mouse hole
5/16/2016 5/16/2016 0.50 INTRM2 CEMENT SVRG P Service rig&ST 80 0.0 0.0
11:45 12:15
5/16/2016 5/16/2016 9.00 INTRM2 CEMENT PULD P L/D 87 stands 5"DP&5 stands 0.0 0.0
12:15 21:15 HWDP via 90'mouse hole
5/16/2016 5/16/2016 0.50 INTRM2 CEMENT RURD P R/U cement head&cement lines.PT 0.0 0.0
21:15 21:45 lines to 3500 psi.
5/16/2016 5/17/2016 2.25 INTRM2 CEMENT CIRC P Open stage collar w/3050 psi @ 87 6,708.0 6,708.0
21:45 00:00 strks.Stage pumps to 8 bpm @ 450
psi&circ&cond for second stage
cement job.
5/17/2016 5/17/2016 0.50 INTRM2 CEMENT CIRC P Circ&cond for second stage cement 6,708.0 6,708.0
00:00 00:30 job w/8 bpm @ 440 psi.
5/17/2016 5/17/2016 1.50 INTRM2 CEMENT OTHR T Observed that cement plug had been 6,708.0 6,708.0
00:30 02:00 inadvertently dropped due to
mechanical cement head failure.
Called town&decesion to attempt tp
reverse circulate plug out of hole.
5/17/2016 5/17/2016 0.25 INTRM2 CEMENT RURD T R/D cement head&lines.&line up to 6,708.0 6,708.0
02:00 02:15 reverse circulate
5/17/2016 5/17/2016 0.75 INTRM2 CEMENT CIRC T Reverse circulate 52.7 bbls w/2.5 bpm 6,708.0 6,708.0
02:15 03:00 @ 200 psi.Recover cement plug.
5/17/2016 5/17/2016 0.25 INTRM2 CEMENT RURD T R/U cement head&cement lines. 6,708.0 6,708.0
03:00 03:15
5/17/2016 5/17/2016 1.75 INTRM2 CEMENT CMNT P Break circ. F/C(static.Line up to 6,708.0 6,708.0
03:15 05:00 Dowell.Cement 2nd stage as per
Dowell.Flood lines&pressure test to
4000 psi(good)Dowell pump 40.1
bbls 12.5 ppg mud push,59 bbls 15.8
ppg Class G 1.16 ft3/sx yld cement,
drop closing plug, 10.2 bbls H2O,
displace w/300 bbls 10.3 ppg LSND.
ICP 6 bpm @ 500 psi/FCP 3 bpm @
390 psi.Bump plug&pressure up to
2000 psi&hold for 5 min.Bleed off
pressure&check floats(good)F/C
annulus(good).CIP @ 4:40 hrs
5/17/2016 5/17/2016 0.75 INTRM2 CEMENT RURD P R/D cement lines&cement head. 0.0 0.0
05:00 05:45
5/17/2016 5/17/2016 0.50 INTRM2 CEMENT WWWH P M/U stack washer&flush stack. 0.0 0.0
05:45 06:15
Page 7/18 Report Printed: 6/2/2016
operations Summary (with Timelog Depths)
P
aYw�.'. u--,
Qt CD5-02
hi lips
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (EKE) End Depth(EKE)'..
5/17/2016 5/17/2016 1.50 INTRM2 CEMENT WWSP P FMC pull wear ring.Set pack off&test 0.0 0.0
06:15 07:45 250/5000 psi for 15 min.
5/17/2016 5/17/2016 1.00 INTRM2 CEMENT BOPE P C/O upper rams f/7 5/8"to 3 1/2"X6" 0.0 0.0
07:45 08:45 VBR's.SIMOPS- C/O saver sub to
XT 39
5/17/2016 5/17/2016 1.25 INTRM2 WHDBOP RURD P Set test plug.Fill stack&lines w/H20. 0.0 0.0
08:45 10:00 R/U to test BOPE.
5/17/2016 5/17/2016 2.75 INTRM2 WHDBOP WAIT T Perform 2000 psi body test on BOPE. 0.0 0.0
10:00 12:45 Wait on AOGCC Guy Cook to arrive
on rig.SIMOPS-work on MP2's
5/17/2016 5/17/2016 5.00 INTRM2 WHDBOP BOPE P BOPE Test:Test with 4"&4 1/2"test 0.0 0.0
12:45 17:45 joints,Test Annular to 250/2,500 psi
for 5 min,Test choke valves#1 -14
and needle valve to 250/3,500 psi for
5 min.HCR Choke and Kill,4"Demco,
5"FOSV,dart&needle valves,auto&
manual IBOP,HCR choke&kill,3 1/2"
X 6"upper&lower VBR's,&blind
rams to 250/3500 psi for 5 min.
Koomey test; IP=3,050 psi,manifold
press after close=1,450 psi,200 psi
recovery 31 sec,full recovery 178 sec,
N2-4 bottle average=2350 psi.
Tested gas&pit level alarms.Draw
down on man&super choke to 1,200
psi. - Test witnessed by Guy Cook of
the AOGCC.
5/17/2016 5/17/2016 1.00 INTRM2 WHDBOP RURD P R/D testing equipment.B/D choke& 0.0 0.0
17:45 18:45 kill lines.Pull test plug&set 7.25"ID
wear ring.
5/17/2016 5/17/2016 0.75 INTRM2 CEMENT BHAH P Bring BHA tools&equipment to rig 0.0 0.0
18:45 19:30 floor.
5/17/2016 5/17/2016 2.00 INTRM2 CEMENT BHAH P M/U BHA as per SLB to 335'(SIMOPS 0.0 335.0
19:30 21:30 -AD/LOT,H2O flush,FP on 10 3/4"X
7 5/8"OA)
5/17/2016 5/17/2016 2.00 INTRM2 CEMENT PULD P RIH w/6 3/4"BHA while P/U 4"DP 335.0 2,229.0
21:30 23:30 f/335'to 2,229'
5/17/2016 5/18/2016 0.50 INTRM2 CEMENT DHEQ P Shallow hole test MWD tools w/220 2,229.0 2,229.0
23:30 00:00 gpm @ 1040 psi
5/18/2016 5/18/2016 2.25 INTRM2 CEMENT PULD P RIH while P/U 4"DP f/2,229'to 4,127' 2,229.0 4,127.0
00:00 02:15
5/18/2016 5/18/2016 0.75 INTRM2 CEMENT SLPC P Slip&cut 75'drill line. 4,127.0 4,127.0
02:15 03:00
5/18/2016 5/18/2016 0.75 INTRM2 CEMENT SVRG P Service blocks&calibrate block height 4,127.0 4,127.0
03:00 03:45
5/18/2016 5/18/2016 2.75 INTRM2 CEMENT PULD P RIH while P/U 4"DP f/4,127'to 6,501' 4,127.0 6,501.0
03:45 06:30
5/18/2016 5/18/2016 0.75 INTRM2 CEMENT PRTS P R/U testing equip.Pressure test 6,501.0 6,501.0
06:30 07:15 casing to 1000 psi.R/D testing equip.
5/18/2016 5/18/2016 0.75 INTRM2 CEMENT COCF P W&R f/6,501'to 6,706'w/140 gpm, 6,501.0 6,706.0
07:15 08:00 720 psi,30 rpm 5 k trq.Tag top of
closing plug @ 6,706'
5/18/2016 5/18/2016 1.00 INTRM2 CEMENT DRLG P Drill stage collar f/6,706'to 6,711 6,706.0 6,711.0
08:00 09:00 w/140-200 gpm,720-1480 psi,30-
80 rpm 5-7.5 k trq.
5/18/2016 5/18/2016 1.50 INTRM2 CEMENT COCF P W&R f/6,711'to 7,069'w/200 gpm, 6,711.0 7,069.0
09:00 10:30 1470 psi,30 rpm 5-7.5 k trq.
Page 8/18 Report Printed: 6/2/2016
•
4 .... Operations Summary (with Timelog Depths)
CD5-02
ConacoPhiiilips
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time End Time Dur(hr)` Phase Op Code Activity Code Time P-T-X Operation (ftKB)' End Depth MKS)'
5/18/2016 5/18/2016 2.00 INTRM2 CEMENT PULD P RIH while P/U 4"DP f/7,069'to 8,968' 7,069.0 8,968.0
10:30 12:30
5/18/2016 5/18/2016 1.50 INTRM2 CEMENT QEVL P Down link to tools. Perform real time 8,968.0 9,157.0
12:30 14:00 LWD sonic TOC pass RIH/MAD pass
f/8,968'to 9,157'w/200 gpm @ 1780-
1900 psi
5/18/2016 5/18/2016 3.25 INTRM2 CEMENT PULD P RIH while P/U 4"DP f/9,157'to 9,157.0 12,006.0
14:00 17:15 12,006'
5/18/2016 5/18/2016 5.25 INTRM2 CEMENT QEVL P Perform sonic LWD TOC pass in 12,006.0 13,528.0
17:15 22:30 recorded mode @ 900 ft/hr.RIH/MAD
pass f/12,006'to 13,528'w/220 gpm
@1900-2160 psi,50 rpm 12-14.5k
trq,PU 235 k,SO 100 k,ROT 145 k
5/18/2016 5/19/2016 1.50 INTRM2 CEMENT QEVL P Perform real time LWD sonic TOC 13,528.0 13,814.0
22:30 00:00 pass @ 450 ft/hr.RIH f/13,528'to
13,814'w/220-250 gpm @ 1850-
2210 psi,50 rpm 16-18 k trq,PU 285
k,SO 105 k,ROT 145 k
5/19/2016 5/19/2016 2.25 INTRM2 CEMENT QEVL P Perform real time LWD sonic TOC 13,814.0 14,289.0
00:00 02:15 pass @ 450 ft/hr.RIH/MAD pass
f/13,814'to 14,289'w/230 gpm @
2070 psi,60 rpm, 18 k trq
5/19/2016 5/19/2016 1.50 INTRM2 CEMENT PRTS P R/U testing equipment.Test casing to 14,289.0 14,289.0
02:15 03:45 3500 psi(good).R/D testing equip.
5/19/2016 5/19/2016 1.50 INTRM2 CEMENT COCF P W&R f/14,289'to 14,524'w/220 gpm, 14,289.0 14,524.0
03:45 05:15 1920 psi,60 rpm, 18.5 k trq.
5/19/2016 5/19/2016 1.75 INTRM2 CEMENT DRLG P Drill shoe track(/14,524'to 14,704' 14,524.0 14,704.0
05:15 07:00 w/220 gpm, 1920 psi,60 rpm, 18.5 k
trq.(Baffle adaptor 14,524',F/C
14,605',&shoe 14,686')
5/19/2016 5/19/2016 0.50 INTRM2 CEMENT DDRL P Drill 20'new hole 14,704'to 14,724' 14,704.0 14,724.0
07:00 07:30 MD/7,352'TVD,ADT.45 hrs,ECD
10.47 ppg,250 gpm,2240 psi,PU 295
k,SO 105 k,ROT 155 k,60 rpm,TRQ
18/19.5 k fUlbs
5/19/2016 5/19/2016 2.50 INTRM2 CEMENT CIRC P Pull inside casing&circ B/U w/250 14,724.0 14,694.0
07:30 10:00 gpm,2250 psi,60 rpm, 19.5 k trq
5/19/2016 5/19/2016 1.00 INTRM2 CEMENT FIT P R/U testing equipment.FIT to 12.5 14,694.0 14,694.0
10:00 11:00 ppg @ 1240 psi.R/D testing equip.
5/19/2016 5/19/2016 1.50 PROD1 DRILL MPDA P Remove trip nipple.Install MPD 14,694.0 14,724.0
11:00 12:30 bearing.F/C(static).Break circ&
break in bearing to 14,724'
5/19/2016 5/20/2016 11.50 PROD1 DRILL DDRL P Drill ahead f/14,724'to 16,101'MD/ 14,724.0 16,101.0
12:30 00:00 7,378'TVD,ADT 8.94 hrs,ECD 10.15
ppg,275 gpm,2430 psi,PU 203 k,SO
133 k,ROT 162 k,180 rpm,TRQ
6.5/11 k ft/lbs
Displace to 9.0 ppg FloPro on the fly.
5/20/2016 5/20/2016 12.00 PROD1 DRILL DDRL P Drill ahead(/16,101'to 17,800'MD/ 16,101.0 17,800.0
00:00 12:00 7,380'TVD,ADT 8.80 hrs, ECD 10.44
ppg,275 gpm,2710 psi,PU 215 k,SO
115 k,ROT 160 k, 180 rpm,TRQ 18/9
k ft/lbs
5/20/2016 5/21/2016 12.00 PROD1 DRILL DDRL P Drill ahead f/17,800'to 19,531'MD/ 17,800.0 19,531.0
12:00 00:00 7,356'TVD,ADT 8.33 hrs,ECD 10.54
ppg,275 gpm,2670 psi,PU 212 k,SO
117 k,ROT 158 k,180 rpm,TRQ 18/9
k fUlbs
Page 9/18 Report Printed: 6/2/2016
!perations Summary (with Timelog epths)
gq$04*,
CD5-02
COnocaPhillips
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
start Depth
Start Time End Time Dur(hr) Phase Op Code Activity Code'. Time P-T-X Operation (ftKB) Erie Depth OtKE)
5/21/2016 5/21/2016 11.25 PROD1 DRILL DDRL P Drill ahead f/19,531'to 21,098'MD/ 19,531.0 21,098.0
00:00 11:15 7,354'TVD,ADT 7.45 hrs,ECD 10.24
ppg,275 gpm,2950 psi,PU 225 k,SO
118 k,ROT 160 k, 160 rpm,TRQ
15/10.5 k ft/lbs.Crossed faults at
20,900'and 20,955'.Mud losses
increased from seepage to 190 bph
max from 20,930',reduced flow rate to
230 gpm and pumped 1st LCM pill,25
ppb,at 21,056'
5/21/2016 5/21/2016 0.75 PROD1 DRILL CIRC T Pump down 1st 25 ppb pill(5 ppb ea 21,098.0 21,098.0
11:15 12:00 Dynared F and M,5 ppb Safecarb
250,5 ppb ea Nut Plug M and F)at
250 gpm 2340 psi,reduce to 180 gpm
1670 psi as pill exited bit.50 rpm,9-5-
10k Tq. Mix and pump LCM pill#2,30
ppb total,5 ppb ea Dynared F and M,
10 ppb Safecarb 250,5 ppb ea Nut
Plug F and M.
Loss for tour=427 bbl
5/21/2016 5/21/2016 1.00 PROD1 DRILL CIRC T Continue pumping down 30 bbl LCM 21,098.0 21,098.0
12:00 13:00 pill#2 @ 3 bpm, 1580 psi,50 rpm 9.5k
Tq,increase to 230 gpm 2350 psi after
pill above BHA.
OA=460 psi @ 12:00
5/21/2016 5/21/2016 1.00 PROD1 DRILL BKRM T Backream out of hole from 21096'to 21,098.0 20,865.0
13:00 14:00 20865'MD @ 3 bpm,920 psi,5-rpm,
9k Tq.
5/21/2016 5/21/2016 4.25 PROD1 DRILL CIRC T Pump 39 bbl LCM pill#3,30 ppb total 20,865.0 20,865.0
14:00 18:15 (5 ppb ea Dynared F and M,5 ppb ea
Safecarb 250 and 500,5 ppb ea Nut
plug F and M,viscosified with 1.5 ppb
Duovis)Pump down at 3 bpm,940
psi,50 rpm,9k Tq.80-bph loss rate.
Held 100 psi on annulus with chokes
as pill exited bit to dynamic squeeze
pill.Circulate @ 3 bpm,840 psi,20
rpm.45 bph loss rate.Pumped 34 bbl,
LCM pill#4(same as#3),held 120 psi
on chokes as pill exits bit.Circulate @
5 bpm, 1840 psi,20 rpm 7.5k,loss
rate 100 bpm.
5/21/2016 5/21/2016 2.25 PROD1 DRILL CIRC T Pump LCM pill#5,30 ppb total LCM, 20,865.0 20,865.0
18:15 20:30 (10 ppb Dynared M,10 ppb Safecarb
500, 10 ppb Nut Plug M,viscosified
with 1.5 ppb polymer)Pump pill down
@ 5 bpm,2000 psi,20 rpm,8k Tq 64
bph loss rate.Apply 120 psi choke
pressure as pill exited bit and
backreamed stand,held 120 psi for 5
min and release.Circulate @ 5.5 bpm
loss rate stabilized @—15 bph.
5/21/2016 5/21/2016 0.50 PROD1 DRILL SMPD T Strip back in hole to 21098'MD while 20,865.0 21,098.0
20:30 21:00 filling pits and building LCM pill#6.
Page 10/18 Report Printed: 6/2/2016
' a; !perations Summary (with Timelog Depths)
,« CD5-02
034x3craPhiliips
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time End Time Out(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB), End Depth(ftKB)'
5/21/2016 5/22/2016 3.00 PROD1 DRILL DDRL P Continue directional drilling ahead 21,098.0 21,342.0
21:00 00:00 from 21098'MD to 21342'MD,7350'
TVD,ADT 2.13 hrs,ECD 9.0-9.6
ppgm,275 gpm, 1800 psi,PU 215 k,
SO 118 k,ROT 165 k, 180 rpm,TRQ
12.5/8.5 k ft/lbs.Losses increased to
70 bph after drilling fault block from
21216'MD to 21300'MD.Decide to
drill ahead through faults,total loss of
returns at times(300 bph)Continue
drilling down to spot pills.
OA=330 psi @ 23:00 hrs.
Losses for tour=625 bbl
Total losses for day=1122 bbl
5/22/2016 5/22/2016 5.50 PROD1 DRILL DDRL P Continue directional drilling ahead 21,342.0 22,106.0
00:00 05:30 from 21342'MD to 22106'MD,7345'
TVD,ADT 3.3 hrs,ECD 9.9-10.33
ppg,230 gpm,2300 psi,PU 225 k,SO
110 k, ROT 167 k, 180 rpm,TRQ 15/9
k ft/lbs.Pumped LCM pills#7 and 8
all 30 bbl,30 ppb while drilling,losses
varied from 60 bph to 144 bph.
5/22/2016 5/22/2016 1.50 PROD1 DRILL CIRC T Pump 40 bbl,30 ppb LCM pill#9, 22,106.0 22,106.0
05:30 07:00 pumped down at 3 bpm,900-960 psi.
Dynamically squeeze into loss zone
using MPDE 20-140 psi annular
pressure.
5/22/2016 5/22/2016 1.50 PROD1 DRILL CIRC T Puymp 39.5 bbl,30 ppb LCM pill 22,106.0 22,106.0
07:00 08:30 across loss zone at 2.5-3.9 bpm,740-
1150 psi,50 rpm,8-9k Tq.Spot pill
across loss zone,pumps off and line
up on MPD.
SIMOPS continue filling rig pits with
Flo Pro.
5/22/2016 5/22/2016 1.00 PROD1 DRILL OWFF T Monitor well with 3 bpm, 120 psi 22,106.0 22,106.0
08:30 09:30 through MPDE,61 bph static loss rate.
5/22/2016 5/22/2016 2.50 PROD1 CASING SMPD T Strip OOH from 22106'MD to 21342' 22,106.0 21,342.0
09:30 12:00 MD with 1.5 bpm,330 psi @ 21380'
MD,25k up wt.P/U=245k,S/0=118k.
Total losses for tour=974 bbl
OA pressure=260 psi @ 11:15 hrs.
5/22/2016 5/22/2016 1.25 PROD1 CASING PMPO T Pump out of hole from 21342'MD to 21,342.0 20,864.0
12:00 13:15 20864'MD @ 1.5 bpm 320 psi.
P/U=240k,S/0=115k.
5/22/2016 5/22/2016 6.00 PROD1 CASING CIRC T Pump 38 bbl LCM pill#11 (50 ppb)@ 20,864.0 20,864.0
13:15 19:15 2 bpm,410 psi,20 rpm,9.5k Tq.(88
bph loss rate).Slow to 165 gpm with
pill at bit, 1250 psi,hold 200 psi on
choke as pill exits bit to squeeze into
loss zone.Circulate 3 bpm 810 psi,20
rpm,8k Tq,(110 bph loss rate).Pump
37 bbl LCM pill#12(50 ppb),hold
200 psi as exiting bit again,cirulate 3
bpm 800 psi 88 bph loss rate.Pump
39 bbl LCM pill#13(50 ppb)@ 3
bpm, 100 bph loss rate.Hold 225 psi
as pill exits bit.
Page 11/18 Report Printed: 6/2/2016
' .x Iterations Summary (with Timelog epths)
CD5-02
Conaccehillips
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time : End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (EKE) End Depth(ftKE)'.
5/22/2016 5/22/2016 0.25 PROD1 CASING OWFF T Monitor static loss with rotary @ 7 20,864.0 20,864.0
19:15 19:30 rpm,8.5k Tq.(15 bph static loss rate)
5/22/2016 5/23/2016 4.50 PROD1 CASING CIRC T Circulate @ 2-3 bpm,500-600 psi 20 20,864.0 20,864.0
19:30 00:00 rpm,9k Tq.(64 bph loss rate.Pumped
65 bbl LCM pill#14(55 ppb)@ 3-4
bpm down string,slowed to 165 gpm
as pill exits bit. Hold 200 psi
backpressure on MPD chokes as pill
exits bit to squeeze.Squeezed 34 bbl
of pill to formation,picked up stand
slowly also for additional 4.5 bbl layed
in.Circulate @ 1 bpm 300 psi,20 rpm,
9.5k Tq(72 bph loss rate)
Losses for tour=1096 bbl
Losses for day=2043 bbl
48 hr losses=3165 bbl
OA pressure=270 psi
5/23/2016 5/23/2016 0.75 PROD1 CASING CIRC T Circulate @ 1 bpm,250 psi,20 rpm, 20,864.0 20,864.0
00:00 00:45 9k Tq(adding LCM @ 2 ppb to active
and building 110 bbl pill.)
5/23/2016 5/23/2016 0.50 PROD1 CASING OWFF T Circulate over top of hole @ 3 bpm, 20,864.0 20,864.0
00:45 01:15 110 psi,5 rpm,8k Tq.Obtain 40 bph
static loss rate.
5/23/2016 5/23/2016 0.75 PROD1 CASING CIRC T Circulate @ 1 bpm,270 psi,5 rpm,8k 20,864.0 20,864.0
01:15 02:00 Tq(adding LCM @ 2 ppb to active
and building 110 bbl pill.)Losses @ 1
bpm=45 bph
5/23/2016 5/23/2016 5.50 PROD1 CASING CIRC T Pump 110 bbl,50 ppb LCM pill(55 bbl 20,864.0 20,864.0
02:00 07:30 returns)@ 4 bpm 1010 psi down
string,reduce to 1 bpm 660 psi,460
psi once pill cleared bit.36 bph
dynamic loss rate @ 1 bpm.Continue
adding 2 ppb to active.
5/23/2016 5/23/2016 1.00 PROD1 CASING OWFF T Circulate over top of hole @ 3 bpm, 20,864.0 20,864.0
07:30 08:30 110 psi 5 rpm,8k TQ. Obtain 21 bph
static loss rate.(SIMOPS-Build 2nd
110 bbl super pill @ 50 ppb)
5/23/2016 5/23/2016 0.25 PROD1 CASING CIRC T Establish circulation thru BHA @ 2 20,864.0 20,864.0
08:30 08:45 bpm,680 psi,25 rpm,9.5k TQ
5/23/2016 5/23/2016 1.25 PROD1 CASING CIRC T Pump 116 bbl of 50 ppb LCM pill(60 20,864.0 20,864.0
08:45 10:00 bbl returned)@ 3-4 bpm,700-1300
psi,25 rpm,9k Tq,
5/23/2016 5/23/2016 1.00 PROD1 CASING CIRC T Dynamically squeeze LCM pill into 20,864.0 20,864.0
10:00 11:00 formation using MPD chokes,holding
240 psi annular pressure,60%
returns.Re,ease pressure,SIMOPS-
build another pill.
5/23/2016 5/23/2016 0.50 PROD1 CASING CIRC T Circulate 4-7-5 bpm, 1740-1830 psi, 20,864.0 20,864.0
11:00 11:30 25 rpm,8k TQ.
5/23/2016 5/23/2016 0.50 PROD1 CASING CIRC T Pump 100 bbl of 50 ppb LCM pill(80 20,864.0 20,864.0
11:30 12:00 bbl returned)@ 5 bpm, 1650 psi,25
rpm,9k Tq,
Page 12/18 Report Printed: 6/2/2016
11' !perations Summary (with Timeloglitths)
,4412:10:40.7005CD5-02
C ma cooPhilihps a,
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time End Time Our(hr) Phase Op Coite Activity CodeTime P-T-X operation (MO) End Depth(ftKB);
5/23/2016 5/23/2016 1.75 PROD1 CASING CIRC T Continue pumnping LCM pill#17 out 20,864.0 20,864.0
12:00 13:45 bit @ 165 gpm, 1290-1370 psi,25
rpm, 10k Tq no back pressure.
Pumped 100 bbl out,lost 23 bbl while
exiting bit.Circulate @ 230 gpm 2340
psi.Drop rate to 210 gpm, 1840 psi,
loss rate 80 bph.
Tour losses=645 bbl
OA pressure=270 psi @ 11:30 hrs
5/23/2016 5/23/2016 0.75 PROD1 CASING OWFF T Line up and monitor static losses(22 20,864.0 20,864.0
13:45 14:30 bph)
5/23/2016 5/23/2016 2.50 PROD1 CASING CIRC T Circulate 5 bpm 1620 psi,20 rpm,9k 20,864.0 20,864.0
14:30 17:00 Tq.(loss rate 56 bph)Pump 84 bbl
LCM pill#18(50 ppb)@ 5 bph, 1550-
1810 psi,20 rpm,9.5k Tq.(loss rate
76 bph while pumpng down)Reduce
rate to 165 gpm and hold 240 psi
annular pressure with MPD chokes to
dynamically squeeze.Pumped 84 bbl
out,39 bbl lost.Circulate @ 5 bpm
1760 psi,20 rpm,9.5k Tq.
5/23/2016 5/23/2016 0.75 PROD1 CASING OWFF T Line up and monitor static losses(13 20,864.0 20,864.0
17:00 17:45 bph)
5/23/2016 5/23/2016 2.75 PROD1 CASING CIRC T Circulate 5 bpm, 1600 psi,20 rpm,9k 20,864.0 20,864.0
17:45 20:30 Tq.Loss rate 56 bph.Pump 120 bbl
LCM pill#19 down @ 5 bpm, 1790
psi,20 rpm,9k(Loss rate 60 bph
while pumping.)Reduce rate to 165
gpm at bit and hold 240-250 psi
annular pressure with chokes as pill
exited bit,(50%returns)
5/23/2016 5/23/2016 0.25 PROD1 CASING MPDA T Rack back 1 stand of DP from 20864' 20,864.0 20,770.0
20:30 20:45 MD to 20770'MD and line up MPD for
stripping.
5/23/2016 5/23/2016 0.75 PROD1 CASING SMPD T Strip out of hole from 20770'MD to 20,770.0 20,484.0
20:45 21:30 20484'MD,320 psi pulling and 30 psi
in slips.Actual E11=23 bbl,Calc Fill
1.87 bbl.MPD chokes not responding
well to losing wellbore.Attempt to
pump out a stand,no returns.
5/23/2016 5/23/2016 1.00 PROD1 CASING OWFF T Pump @ 3 bpm until returns 20,484.0 20,484.0
21:30 22:30 established, 10 bbl pumped,7 bbl lost.
Line up on top of hole to establish
static loss rate, 12 bph.
5/23/2016 5/24/2016 1.50 PROD1 CASING SMPD P Strip out of hole from 20484'MD to 20,484.0 18,860.0
22:30 00:00 18860'MD, 150 psi Annular pressure
pulling,90 psi in slips. Pushing away
20 bph in addition to 10 bph known
static loss.
Tour losses=481 bbl
Daily losses=1126 bbl
Cumulative losses=4291
OA pressure 360 psi @ 22:00 hrs
5/24/2016 5/24/2016 3.00 PROD1 CASING SMPD P Strip out of hole with MPD from 18860' 18,860.0 14,957.0
00:00 03:00 MD to 14957'MD holding 150 psi
Annular pressure pulling and 90 psi in
slips,pulling speed 3000 fph.Losing
average 30 bph in addition to pipe
displacement.
Page 13/18 Report Printed: 6/2/2016
!perations Summary (with Timelog Depths)
� :` CD5-02
C ,i ltp
,�.ExaN:.a
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Tome, End Tune Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB)
5/24/2016 5/24/2016 1.25 PROD1 CASING BKRM P Precautionary backream from 14957 14,957.0 14,670.0
03:00 04:15 MD to 14670'MD into casing shoe @
200 gpm, 1260 psi, 100 rpm,6.5-7k
Tq.P/U=215,S/0=140 ROT=165k.
Observed 3-7k overpull as BHA
stabilizers enter shoe.Dynamic losses
—20-25 bph.
5/24/2016 5/24/2016 1.50 PROD1 CASING CIRC P Circulate and condition @ 200 gpm, 14,670.0 14,575.0
04:15 05:45 1290 psi, 100 rpm,6k Tq.ECD=9.57
ppg EMW.Dynamic losses—30-35
bph.Rack stand back to 14575'MD
after one bottom up.
5/24/2016 5/24/2016 1.50 PROD1 CASING CIRC T Continue circulate and condition @ 14,575.0 14,575.0
05:45 07:15 200 gpm, 1290 psi, 100 rpm,6k Tq.
ECD=9.57 ppg EMW. Dynamic losses
—30-35 bph,perform 2nd bottoms up
to clean up LCM from system and
clean casing.
5/24/2016 5/24/2016 0.25 PROD1 CASING OWFF P Observe well for flow-Static 14,575.0 14,575.0
07:15 07:30
5/24/2016 5/24/2016 0.50 PROD1 CASING OWFF P Line up on MPD and pump across the 14,575.0 14,575.0
07:30 08:00 top of hole @ 2.5 bpm,80 psi to
obtain static loss rate 14 bph.
5/24/2016 5/24/2016 0.50 PROD1 CASING CIRC P Pump 40 bbl 10 ppg dry job @ 200 14,575.0 14,575.0
08:00 08:30 gpm, 1290 psi chase with 8 bbl 9 ppg
Flo Pro.Blow down top drive.
5/24/2016 5/24/2016 3.50 PROD1 CASING SMPD P Continue strip out of hole with MPD 14,575.0 9,821.0
08:30 12:00 from 14575'MD to 9821'MD holding
180 psi Annular pressure pulling and
90 psi in slips,pulling speed 3000-
4000 fph.Losing average 30 bph in
addition to pipe displacement.
5/24/2016 5/24/2016 5.00 PROD1 CASING SMPD P Continue strip out of hole with MPD 9,821.0 4,887.0
12:00 17:00 from 9821'MD to 4887'MD holding
180-90 psi Annular pressure pulling
and 90-50 psi in slips,pulling speed
4000 fph.(Floats not holding)Losing
average 30 bph in addition to pipe
displacement.Attempt to pump briefly
to clear floats of LCM without success.
OA pressure 280 psi @ 11:30 hrs.
5/24/2016 5/24/2016 1.50 PROD1 CASING CIRC P Circulate @ 5 bpm, 1100-960 psi, 4,887.0 4,887.0
17:00 18:30 pump 33 bbl 11.8 ppg dry job,Blow
down top drive.P/U=115,S/0=100.
5/24/2016 5/24/2016 4.50 PROD1 CASING SMPD P Continue strip out of hole with MPD 4,887.0 363.0
18:30 23:00 from 4887'MD to 363'MD reducing
annular pressure to 50 psi in/out of
slips,pulling speed 4000 fph.(Floats
not holding)Losing average 30 bph in
addition to pipe displacement.
5/24/2016 5/24/2016 0.75 PROD1 CASING OWFF P Perform flow check,on vac. 363.0 363.0
23:00 23:45 PJSM,flush MPD system with 20 bbl
water and blow down MPD lines.
SIMOPS-Function rams
6 bbl to refill hole after functioning
rams.
Page 14/18 Report Printed: 6/2/2016
• 4110
Operations Summary (with Timelog Depths)
CD5-02
ConocoPhillips
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-XOperation (EKE) End Depth(EKE)
5/24/2016 5/25/2016 0.25 PROD1 CASING MPDA P Pull RCD bearing and strip from pipe, 363.0 363.0
23:45 00:00 install trip nipple.
OA pressure=250 psi @ 23:50 hrs
Total losses for day=620 bbl
Cummulative losses=4911 bbl
5/25/2016 5/25/2016 0.50 PROD1 CASING OWFF P Observe well for flow,fill hole and 363.0 363.0
00:00 00:30 observe.Good,fluid dropping losing
20 bph.
5/25/2016 5/25/2016 0.50 PROD1 CASING BHAH P Lay down BHA from 363'MD to 112' 363.0 112.0
00:30 01:00 MD.LID HWDP,Jars,NMFC,WEPS,
float subs and XO.
5/25/2016 5/25/2016 0.75 PROD1 CASING BHAH P Continue laying down BHA per SLB 112.0 0.0
01:00 01:45 DD/MWD,break bit.Verify recorded
data pack is present and begin
downloading in pipe shed.
5/25/2016 5/25/2016 1.00 PROD1 CASING BHAH P Clean and clear rig floor,lay down 0.0 0.0
01:45 02:45 BHA tools via Beaver slide.
SIMOPS-FMC pull drilling wear ring
and set completion thin wear ring.24
bph static loss rate.
5/25/2016 5/25/2016 1.50 COMPZN RPCOMP RURD P R/U to run 4W tubing string,power 0.0 0.0
02:45 04:15 tongs with Torque Turn,4W tubing
elevators,FOSV with XO.P/U tubing
tools and XO's via Beaverslide.
SIMOPS-Organize running order in
pipe shed and flag pipe.
5/25/2016 5/25/2016 0.25 COMPZN RPCOMP SFTY P PJSM on running 41/2"tubing 0.0 0.0
04:15 04:30 completion
5/25/2016 5/25/2016 7.50 COMPZN RPCOMP PUTB P P/U and RIH with 4'/2'tubing string per 0.0 6,433.0
04:30 12:00 detail from surface to 6433'MD using
torque turn, 160 jts.Torque TXP up to
7000 ft/lbs, ITBM and H563 to 4000
fUlbs.P/U=110k,S/O=95k.
OA pressure @ 10:00 hrs=230 psi
5/25/2016 5/25/2016 9.25 COMPZN RPCOMP PUTB P Continue to P/U and RIH with 4V2' 6,433.0 14,629.0
12:00 21:15 tubing string per detail from 6433'MD
to 14629'MD using torque turn to joint
370.Torque TXP up to 7000 ft/lbs.
OA pressure @ 10:00 hrs=230 psi
5/25/2016 5/25/2016 0.50 COMPZN RPCOMP RURD P Make up wear ring retrieval tool and 14,629.0 14,629.0
21:15 21:45 pull wear ring with landing joint B,lay
down same.
5/25/2016 5/25/2016 0.50 COMPZN RPCOMP PUTB P RIH with 4'/z'TXP tubing string from 14,629.0 14,868.0
21:45 22:15 14629'MD to 14868'MD torque
turning to 7000 ft/lbs.
5/25/2016 5/25/2016 0.75 COMPZN RPCOMP THGR P Make up hanger/pup to 7000 ft/lbs 14,868.0 14,903.7
22:15 23:00 and landing joint A,SIMOPS-Blow
down choke and hole fill lines.RIH
and land hanger 14903.65'MD.
P/U=190k,S/0=105k.
Page 15/18 Report Printed: 6/2/2016
e ' !perations Summary (with Timelog epths)
CD5-02
ConocoPhiiliips
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth MKS)
5/25/2016 5/25/2016 0.75 COMPZN RPCOMP CIRC P Rig up to circulate while testing 14,903.7 14,903.7
23:00 23:45 hanger seals to ensure hole full.(18
bbl to fill)Pump 2 bpm 170 psi,losses
26 bph.
SIMOPS-Test hanger seals to 250 psi
5 min,5000 psi 10 minutes charted
(no leaks).
5/25/2016 5/26/2016 0.25 COMPZN RPCOMP RURD P Rig up sensor and valves on headpin 14,903.7 14,903.7
23:45 00:00 for displacement.
Calculated displacement=53.2 bbl,
Actual displacement=-269
Loss for day=322 bbl
Cumulative losses=5233
OA=230 psi @ 22:30 hrs
5/26/2016 5/26/2016 0.25 COMPZN RPCOMP RURD P R/U 1502 circ equipment,valves,Tee 14,903.7 14,903.7
00:00 00:15 and headpin for displacement.
5/26/2016 5/26/2016 0.50 COMPZN RPCOMP CIRC P Circulate Flo Pro @ 2 bpm, 190 psi 14,903.7 14,903.7
00:15 00:45 SIMOPS-PJSM on brine
displacement and spotting CI brine.
5/26/2016 5/26/2016 5.25 COMPZN RPCOMP CRIH P Pump 35 bbl of 9.0 ppg HiVis spacer 14,903.7 14,903.7
00:45 06:00 @ 3 bpm,chase with 557 bbl 9.0 ppg
brine @ 3 bpm,230 psi.Shut down,
line up on Corrosion inhibitor truck and
pump 78.5 bbl 9.0 ppg inhibited brine.
Shut down and chase with 235 bbl 9.0
ppg brine @ 3 bpm,220 psi.903 bbl
pumped,758 bbl returned,lost 145
during displacement.Spacer back @
770 bbl,good brine at 820 bbl
pumped.
5/26/2016 5/26/2016 0.25 COMPZN RPCOMP PACK P Drop ball/rod.Rig down headpin and 14,903.7 14,903.7
06:00 06:15 drop 1.3125"ball x 2.625"roller-rod.
Rig up 1502 test equipment.Allow
ball/rod to fall for 10 minutes.
5/26/2016 5/26/2016 0.50 COMPZN RPCOMP PACK P Set packer,pressure up to 4000 psi, 14,903.7 0.0
06:15 06:45 observe packer shift @ 1450 psi
(upper slips)Observe second shift @
1790 psi(lower slips).Hold for 10
minutes,bleed off pressure.
5/26/2016 5/26/2016 0.75 COMPZN RPCOMP PRTS P Pressure test tubing to 3500 psi for 30 0.0 0.0
06:45 07:30 minutes charted,bleed tubing to 2000
psi.
5/26/2016 5/26/2016 0.75 COMPZN RPCOMP PRTS P Pressure test packer-IA to 3500 psi 0.0 0.0
07:30 08:15 for 30 minutes charted. Bleed off all
pressure from annulus then tubing.
5/26/2016 5/26/2016 0.25 COMPZN RPCOMP CIRC P Pressure up on IA to 2700 psi and 0.0 0.0
08:15 08:30 observe shear out of SOV,pump 1
bpm,450 psi for 3 bbl to ensure
communication.
5/26/2016 5/26/2016 0.75 COMPZN WHDBOP MPSP P Observe well for flow,static.SIMOPS 0.0 0.0
08:30 09:15 -Rig down test equipment,pull and
L/D landing joint A.FMC set TWC,
install landing joint B.
5/26/2016 5/26/2016 0.75 COMPZN WHDBOP PRTS P R/U and test TWC to 2500 psi for 15 0.0 0.0
09:15 10:00 minutes.Rig down test equipment.
Lay down landing joint B.
5/26/2016 5/26/2016 0.75 COMPZN WHDBOP WWWH P Flush stack w/650 gpm,20 rpm,60 0.0 0.0
10:00 10:45 psi.Blow down topdrive and lay down
stack washer.L/D 1 stand 4"drill pipe.
Page 16/18 Report Printed: 6/2/2016
,,, Aerations Summary (with Timelog Depths)
, CD5-02
CortocoPhiliiips
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time End Time Our(hr) Phase Op Code Activity Cede: Time P-T-X Operation (ftKB)', End Depth(ftKS)',
5/26/2016 5/26/2016 1.25 COMPZN WHDBOP MPDA P PJSM,Rig down MPDE-Trip nipple, 0.0 0.0
10:45 12:00 flow line,holefill,bleeder and drain
lines,Ketch Kan,MPD return lines,
1502 Lo Torc valves,Tees and
sensors.
SIMOPS-Change out saver sub to
DS50.
5/26/2016 5/26/2016 1.00 COMPZN WHDBOP MPDA P Continue rigging down MPDE,FloBox, 0.0 0.0
12:00 13:00 Orbit valve,bearing clamp,
5/26/2016 5/26/2016 3.25 COMPZN WHDBOP NUND P Loosen bolts on ram doors for BWM, 0.0 0.0
13:00 16:15 Nipple down and set BOP on
pedastal.
5/26/2016 5/26/2016 3.00 COMPZN WHDBOP NUND P Nipple up tree and adapter,FMC test 0.0 0.0
16:15 19:15 tree adapter to 5000 psi CPAI
witnessed.R/U and test tree to
250/5000 psi charted 10 min ea.
5/26/2016 5/26/2016 0.50 COMPZN WHDBOP MPSP P FMC pull TWC 0.0 0.0
19:15 19:45
5/26/2016 5/26/2016 0.75 COMPZN WHDBOP FRZP P Rig up lines to cellar to circulate and U 0.0 0.0
19:45 20:30 -tube freeze protect diesel. Pressure
test lines to 2500 psi. PJSM
5/26/2016 5/26/2016 1.00 COMPZN WHDBOP FRZP P Ball mill pumped diesel freeze protect, 0.0 0.0
20:30 21:30 90 bbl down IA taking returns out the
tubing. 1.7 bpm,890 psi.
5/26/2016 5/26/2016 0.50 COMPZN WHDBOP FRZP P U-Tube tubing and IA for 30 minutes. 0.0 0.0
21:30 22:00 SIMOPS-Install mouse hole.
5/26/2016 5/26/2016 0.75 COMPZN WHDBOP FRZP P Clear lines and rig down tubing side 0.0 0.0
22:00 22:45
5/26/2016 5/27/2016 1.25 COMPZN WHDBOP MPSP P R/U FMC luricator and test to 2000 0.0 0.0
22:45 00:00 psi.Set BPV.(Final IA pressure=275
psi)Test BPV to 2500 psi in direction
of flow for 15 min.
Daily losses=185 bbl
Cumulative losses=5418 bbl
5/27/2016 5/27/2016 0.25 COMPZN WHDBOP MPSP P Continue to test BPV in direction of 0.0 0.0 -
00:00 00:15 flow to 2500 psi, 15 minutes.
5/27/2016 5/27/2016 1.00 DEMOB MOVE RURD P Bleed down IA to 375 psi,OA=225 psi. 0.0 0.0
00:15 01:15 Clear lines and rig down from squeeze
manifold.
5/27/2016 5/27/2016 1.50 DEMOB MOVE RURD P Clear rig floor,rig down skate roller. 0.0 0.0
01:15 02:45 Bring tools and equipment to rig floor.
(SIMOPS-Rig down double annulus
valves and secure well.P/U next BHA
tools to rig floor,PJSM on L/D Drill
pipe.
5/27/2016 5/27/2016 9.25 DEMOB MOVE PULD P Lay down 4"drill pipe via 90' 0.0 0.0
02:45 12:00 mousehole(159 jts)
5/27/2016 5/27/2016 4.25 DEMOB MOVE PULD P Continue laying down 4"DP via 90' 0.0 0.0
12:00 16:15 mousehole(55 stands,214 total)
(SIMOPS-Blow down water and
steam @ 1600 hrs.)
5/27/2016 5/27/2016 0.75 DEMOB MOVE RURD P Install skate roller,change out 0.0 0.0
16:15 17:00 elevators from 4"to 5"DP.P/U 4W IF
FOSV/Dart valves.
(SIMOPS-Electrician de-energize Ball
Mill,SCR's and toip drive.
Page 17/18 Report Printed: 6/2/2016
Operations Summary (with TimelogDepths)
W
CD5-02
CmocoPhillips
Rig: DOYON 19 Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time end Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB}
5/27/2016 5/27/2016 1.00 DEMOB MOVE RURD P Finalize rig move checklist.Rig 0.0 0.0
17:00 18:00 release @ 18:00 hrs
Page 18/18 Report Printed: 6/2/2016
• •
NADConversion
Western North Slope
CD5 Alpine West Pad
CD5-02A
CD5-02A
Definitive Survey Report
31 May, 2016
• SLB •
Definitive Survey Report
Company: NADConversion Local Co-ordinate"Reference Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site:° CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Project Western North Slope,North Slope Alaska,United States
Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
Well CD5-02
Well Position +N/-S 0.00 usft Northing: 5,965,910.31 usft Latitude: 70°18'50.309 N
+E/-W 0.00 usft Easting: 349,520.15 usft Longitude: 151°13'10.621 W
Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 34.10 usft
Iibore CD5-02A
Model Name Sample Date Declination Dip Angle Field Strength
(°) (°) (nT)
BGGM2015 4/1/2016 17.70 80.83 57,468
;'.sign CD5-02A
Audit Notes:
Version: 1.0 Phase: ACTUAL Tie On Depth: 2,360.57
Vertical Section - = e 5p} +N/-S +E/-W Direction
1101-4,i*:, ''' (osit;;, {usft) (°)
36.81 0.00 0.00 333.00
Survey Program �,i_
From To
(usft) (usft) Survey',(WeiiDescription Survey Date
100.00 600.00 CD5-02 Svy1-SLB_NSG+MSHOT(CD5 GYD-GC-MS Gyrodata gyrocompassing m/s 3/28/2016 8:50:'
662.12 2,360.57 CD5-02 Svy2-SLB_MWD+GMAG(CD5 MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 3/28/2016 9:01:'
2,452.74 2,639.97 CD5-02A Svy1-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/6/2016 11:29:0
2,734.99 2,734.99 CD5-02A Svy2-SLB_INC-FILLER(CD5 INC+TREND Inclinometer+known azi trend 5/6/2016 11:29:0
2,828.57 14,638.89 CD5-02A Svy3-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/6/2016 11:29:0
14,705.18 14,705.18 CD5-02A Svy4-SLB_INC+FILLER(CD5 INC+TREND Inclinometer+known azi trend 5/19/2016 10:50
14,800.56 21,948.62 CD5-02A Svy5-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/19/2016 10:52
Sr1C1 ,,r� S '7';''11'; rr' r
'4,1C',,'& '
ki,- , Map llllap �r ; VerjjcaI ,,Ti
'•Ili? r r,Inc :',%"",,,,,,I,:;:0,% 'ND WO'SiS. +NI-S ;.,.. +Elm 3. orthing Sting OLS / %`'
4r u C (usft) (unfit} { , ( )' } Toot Name
i 36.81 0.00 0.00 36.81 -34.10 0.00 0.00 5,965,910.31 349,520.15 0.00 0.00 UNDEFINED
100.00 0.25 21.97 100.00 29.09 0.13 0.05 5,965,910.44 349,520.20 0.40 0.09 GYD-GC-MS(1)
200.00 0.45 336.14 200.00 129.09 0.69 -0.03 5,965,911.00 349,520.14 0.33 0.63 GYD-GC-MS(1)
300.00 0.49 331.59 299.99 229.08 1.42 -0.39 5,965,911.74 349,519.79 0.05 1.45 GYD-GC-MS(1)
400.00 1.00 12.41 399.99 329.08 2.65 -0.40 5,965,912.97 349,519.80 0.71 2.55 GYD-GC-MS(1)
500.00 1.76 29.10 499.96 429.05 4.85 0.53 5,965,915.15 349,520.77 0.85 4.08 GYD-GC-MS(1)
600.00 2.46 21.57 599.89 528.98 8.18 2.07 5,965,918.45 349,522.38 0.75 6.35 GYD-GC-MS(1)
662.12 2.50 4.37 661.95 591.04 10.78 2.66 5,965,921.03 349,523.02 1.20 8.39 MWD+IFR-AK-CAZ-SC(2)
754.58 4.34 355.28 754.24 683.33 16.27 2.53 5,965,926.53 349,523.00 2.07 13.35 MVVD+IFR-AK-CAZ-SC(2)
5/31/2016 3:41:28PM Page 2 COMPASS 5000.1 Build 74
• SLB •
Definitive Survey Report
Company: NADConversion Local Co-ordinate Reference: Well CD5-02
Project Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Survey
9
Map" . Map Vertical
MD Inc Azi TVD TVDSS +N/-S +Ef-W Northing Easting DLS Section
(usft) (°) (°) (usft) (usft) (usft) (WPM (ft) ({t) (1100') (ft) Survey Tool Name
848.35 7.24 354.20 847.53 776.62 25.69 1.64 5,965,935.96 349,522.30 3.09 22.15 MWD+IFR-AK-CAZ-SC(2)
942.30 9.87 357.07 940.42 869.51 39.62 0.63 5,965,949.91 349,521.57 2.84 35.02 MWD+IFR-AK-CAZ-SC(2)
1,036.06 11.67 359.72 1,032.53 961.62 57.13 0.17 5,965,967.43 349,521.46 1.99 50.83 MWD+IFR-AK-CAZ-SC(2)
1,131.13 13.07 1.08 1,125.39 1,054.48 77.50 0.32 5,965,987.78 349,522.02 1.50 68.90 MWD+IFR-AK-CAZ-SC(2)
1,225.92 14.67 4.82 1,217.41 1,146.50 100.18 1.54 5,966,010.43 349,523.69 1.93 88.56 MWD+IFR-AK-CAZ-SC(2)
1,318.58 19.54 12.24 1,305.96 1,235.05 127.03 5.81 5,966,037.19 349,528.50 5.75 110.55 MWD+IFR-AK-CAZ-SC(2)
1,415.08 22.60 15.63 1,396.00 1,325.09 160.67 14.23 5,966,070.65 349,537.59 3.41 136.70 MWD+IFR-AK-CAZ-SC(2)
1,510.04 24.01 16.49 1,483.21 1,412.30 196.76 24.63 5,966,106.53 349,548.71 1.53 16414 MWD+IFR-AK-CAZ-SC(2)
1,604.48 26.76 17.67 1,568.52 1,497.61 235.45 36.54 5,966,144.97 349,561.39 2.96 193.20 MVVD+IFR-AK-CAZ-SC(2)
1,695.70 30.55 17.53 1,648.56 1,577.65 277.14 49.76 5,966,186.38 349,575.45 4.16 224.35 MWD+IFR-AK-CAZ-SC(2)
1,793.42 33.69 14.20 1,731.32 1,660.41 327.12 63.89 5,966,236.06 349,590.58 3.69 262.45 MWD+IFR-AK-CAZ-SC(2)
1,888.31 36.08 12.92 1,809.15 1,738.24 379.87 76.60 5,966,288.54 349,604.34 2.63 303.69 MWD+IFR-AK-CAZ-SC(2)
1,982.46 39.70 11.99 1,883.44 1,812.53 436.33 89.05 5,966,344.73 349,617.92 3.89 348.34 MWD+IFR-AK-CAZ-SC(2)
2,076.91 42.58 14.69 1,954.57 1,883.66 496.76 103.42 5,966,404.86 349,633.50 3.58 395.66 MVVD+IFR-AK-CAZ-SC(2)
2,170.36 44.87 18.26 2,022.11 1,951.20 558.66 121.77 5,966,466.38 349,653.08 3.60 442.49 MWD+IFR-AK-CAZ-SC(2)
2,265.64 47.38 23.17 2,088.16 2,017.25 622.84 146.11 5,966,530.05 349,678.70 4.55 488.62 MWD+IFR-AK-CAZ-SC(2)
2,360.57 51.38 24.84 2,149.95 2,079.04 688.63 175.44 5,966,595.24 349,709.34 4.42 533.93 MWD+IFR-AK-CAZ-SC(2)
2,423.99 52.03 23.98 2,189.26 2,118.35 733.96 196.01 5,966,640.14 349,730.81 1.48 564.98 MWD+IFR-AK-CAZ-SC(3)
1D+3 ; 442
2,452.74 52.33 23.59 2,206.88 2,135.97 754.74 205.17 5,966,660.73 349,740 39 1.48 579.34 MWD+IFR-AK-CAZ-SC(3)
2,545.71 56.39 24.65 2,261.05 2,190.14 823.68 236.05 5,966,729.03 349,772.64 4.46 626.74 MWD+IFR-AK-CAZ-SC(3)
2,639.97 53.99 27.03 2,314.86 2,243.95 893.33 269.76 5,966,797.99 349,807.73 3.28 673.49 MWD+IFR-AK-CAZ-SC(3)
2,734.99 52.91 32.94 2,371.48 2,300.57 959.41 307.85 5,966,863.29 349,847.14 5.12 715.08 INC+TREND(4)
2,828.57 53.50 39.31 2,427.56 2,356.65 1,019.87 352.01 5,966,922.85 349,892.50 5.49 748.91 MWD+IFR-AK-CAZ-SC(5)
2,922.65 54.87 38.81 2,482.61 2,411.70 1,079.11 400.08 5,966,981.11 349,941.74 1.52 779.87 MWD+IFR-AK-CAZ-SC(5)
3,016.89 57.10 35.12 2,535.34 2,464.43 1,141.53 447.01 5,967,042.57 349,989.91 4.02 814.17 MWD+IFR-AK-CAZ-SC(5)
3,112.00 59.29 33.00 2,585.47 2,514.56 1,208.49 492.25 5,967,108.60 350,036.48 2.98 853.29 MVVD+IFR-AK-CAZ-SC(5)
3,206.55 61.41 30.06 2,632.25 2,561.34 1,278.52 535.20 5,967,177.76 350,080.82 3.51 896.20 MWD+IFR-AK-CAZ-SC(5)
3,301.30 63.85 26.69 2,675.81 2,604.90 1,352.55 575.15 5,967,250.96 350,122.24 4.07 944.02 MWD+IFR-AK-CAZ-SC(5)
3,394.10 65.74 24.18 2,715.34 2,644.43 1,428.37 611.19 5,967,326.04 350,159.80 3.18 995.21 MWD+IFR-AK-CAZ-SC(5)
3,488.44 66.22 21.27 2,753.75 2,682.84 1,507.84 644.47 5,967,404.82 350,194.66 2.86 1,050.91 MWD+IFR-AK-CAZ-SC(5)
3,582.42 66.34 17.36 2,791.56 2,720.65 1,589.02 672.92 5,967,485.41 350,224.73 3.81 1,110.32 MWD+IFR-AK-CAZ-SC(5)
3,677.29 66.31 13.39 2,829.67 2,758.76 1,672.77 695.95 5,967,568.68 350,249.43 3.83 1,174.49 MWD+IFR-AK-CAZ-SC(5)
3,772.01 66.54 13.23 2,867.55 2,796.64 1,757.25 715.94 5,967,652.74 350,271.11 0.29 1,240.70 MWD+IFR-AK-CAZ-SC(5)
3,865.20 66.06 13.07 2,905.01 2,834.10 1,840.35 735.35 5,967,735.42 350,292.18 0.54 1,305.92 MVVD+IFR-AK-CAZ-SC(5)
3,959.85 66.15 13.67 2,943.35 2,872.44 1,924.54 755.36 5,967,819.18 350,313.87 0.59 1,371.85 MWD+IFR-AK-CAZ-SC(5)
4,054.08 65.53 14.33 2,981.92 2,911.01 2,007.96 776.16 5,967,902.17 350,336.34 0.92 1,436.74 MWD+IFR-AK-CAZ-SC(5)
4,146.86 65.66 14.61 3,020.25 2,949.34 2,089.77 797.27 5,967,983.53 350,359.08 0.31 1,500.04 MWD+IFR-AK-CAZ-SC(5)
4,241.18 65.57 15.12 3,059.19 2,988.28 2,172.80 819.31 5,968,066.10 350,382.78 0.50 1,564.02 MVVD+IFR-AK-CAZ-SC(5)
4,334.98 65.54 14.77 3,098.01 3,027.10 2,255.30 841.33 5,968,148.13 350,406.45 0.34 1,627.53 MWD+IFR-AK-CAZ-SC(5)
5/31/2016 3.41:28PM Page 3 COMPASS 5000.1 Build 74
• SLB 0
Definitive Survey Report
yam.,,.,„ ....... v.._...,
Company: NADConversion Local Co-ordinate Reference: Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method Minimum Curvature I'
Design: CD5-02A Database: EDM Production
Survey "'
'4,kP.Aialg ,', Map Map Vertical
MD Inc Azi TVD TVDSS` +N/-S : +E/-W Northing Easting DLS Section
(usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) ("J1OO') (ft) Survey Toot tame
4,428.97 65.53 15.61 3,136.94 3,066.03 2,337 86 863.75 5,968,230.22 350,430.51 0.81 1,690.92 MVVD+IFR-AK-CAZ-SC(5)
4,524.52 65.58 16.41 3,176.48 3,105.57 2,421.47 887.74 5,968,313.33 350,456.17 0.76 1,754.52 MWD+IFR-AK-CAZ-SC(5)
4,616.05 65.12 16.77 3,214.65 3,143.74 2,501.20 911.49 5,968,392.56 350,481.51 0.62 1,814.78 MWD+IFR-AK-CAZ-SC(5)
4,709.66 64.92 17.04 3,254.18 3,183.27 2,582.39 936.17 5,968,473.23 350,507.81 0.34 1,875.91 MWD+IFR-AK-CAZ-SC(5)
4,804.04 65.06 17.52 3,294.09 3,223.18 2,664.06 961.57 5,968,554.37 350,534.84 0.48 1,937.15 MWD+IFR-AK-CAZ-SC(5)
4,898.96 65.00 18.21 3,334.16 3,263.25 2,745.95 987.97 5,968,635.71 350,562.87 0.66 1,998.13 MWD+IFR-AK-CAZ-SC(5)
4,991.95 64.90 18.02 3,373.53 3,302.62 2,826.02 1,014.16 5,968,715.23 350,590.66 0.21 2,057.58 MWD+IFR-AK-CAZ-SC(5)
5,087.11 64.85 19.09 3,413.93 3,343.02 2,907.70 1,041.58 5,968,796.34 350,619.71 1.02 2,117.91 MVVD+IFR-AK-CAZ-SC(5)
5,181.94 64.90 18.91 3,454.20 3,383.29 2,988.88 1,069.53 5,968,876.93 350,649.28 0.18 2,177.55 MWD+IFR-AK-CAZ-SC(5)
5,275.90 65.00 19.29 3,493.98 3,423.07 3,069.31 1,097.38 5,968,956.79 350,678.74 0.38 2,236.58 MWD+IFR-AK-CAZ-SC(5)
5,369.98 65.04 19.59 3,533.71 3,462.80 3,149.73 1,125.77 5,969,036.62 350,708.72 0.29 2,295.34 MWD+IFR-AK-CAZ-SC(5)
5,464.84 64.87 19.88 3,573.87 3,502.96 3,230.62 1,154.79 5,969,116.91 350,739.36 0.33 2,354.25 MWD+IFR-AK-CAZ-SC(5)
5,557.91 64.93 20.29 3,613.35 3,542.44 3,309.78 1,183.73 5,969,195.46 350,769.88 0.40 2,411.63 MWD+IFR-AK-CAZ-SC(5)
5,653.33 64.77 20.62 3,653.90 3,582.99 3,390.71 1,213.91 5,969,275.76 350,801.68 0.36 2,470.04 MVVD+IFR-AK-CAZ-SC(5)
5,747.51 64.93 20.17 3,693.93 3,623.02 3,470.61 1,243.62 5,969,355.05 350,832.98 0.46 2,527.75 MWD+IFR-AK-CAZ-SC(5)
5,841.85 64.94 19.78 3,733.90 3,662.99 3,550.93 1,272.82 5,969,434.76 350,863.77 0.37 2,586.05 MWD+IFR-AK-CAZ-SC(5)
5,935.50 64.96 19.70 3,773.55 3,702.64 3,630.78 1,301.47 5,969,514.02 350,894.02 0.08 2,644.20 MWD+IFR-AK-CAZ-SC(5)
6,030.19 65.03 19.99 3,813.57 3,742.66 3,711.50 1,330.60 5,969,594.13 350,924.76 0.29 2,702.89 MVVD+IFR-AK-CAZ-SC(5)
6,124.34 65.07 19.90 3,853.29 3,782.38 3,791.75 1,359.72 5,969,673.77 350,955.48 0.10 2,761.17 MWD+IFR-AK-CAZ-SC(5)
6,218.84 65.09 18.95 3,893.11 3,822.20 3,872.57 1,388.22 5,969,754.00 350,985.60 0.91 2,820.24 MWD+IFR-AK-CAZ-SC(5)
6,312.39 64.99 18.59 3,932.58 3,861.67 3,952.87 1,415.51 5,969,833.73 351,014.49 0.36 2,879.40 MWD+IFR-AK-CAZ-SC(5)
6,406.81 65.07 18.16 3,972.44 3,901.53 4,034.10 1,442.50 5,969,914.40 351,043.09 0.42 2,939.53 MWD+IFR-AK-CAZ-SC(5)
6,500.93 64.52 17.35 4,012.52 3,941.61 4,115.20 1,468.47 5,969,994.95 351,070.68 0.97 3,000.00 MWD+IFR-AK-CAZ-SC(5)
6,595.39 64.53 17.24 4,053.15 3,982.24 4,196.62 1,493.82 5,970,075.84 351,097.65 0.11 3,061.04 MWD+IFR-AK-CAZ-SC(5)
6,690.01 64.56 16.53 4,093.82 4,022.91 4,278.37 1,518.63 5,970,157.07 351,124.10 0.68 3,122.61 MWD+IFR-AK-CAZ-SC(5)
6,784.37 64.60 15.72 4,134.33 4,063.42 4,360.24 1,542.30 5,970,238.45 351,149.40 0.78 3,184.82 MWD+IFR-AK-CAZ-SC(5)
6,879.10 64.56 15.49 4,174.99 4,104.08 4,442.65 1,565.32 5,970,320.37 351,174.06 0.22 3,247.79 MWD+IFR-AK-CAZ-SC(5)
6,973.56 64.56 15.43 4,215.57 4,144.66 4,524.86 1,588.06 5,970,402.11 351,198.44 0.06 3,310.72 MWD+IFR-AK-CAZ-SC(5)
7,067.65 64.52 17.02 4,256.02 4,185.11 4,606.43 1,611.79 5,970,483.17 351,223.81 1.53 3,372.62 MWD+IFR-AK-CAZ-SC(5)
7,161.80 64.56 15.59 4,296.49 4,225.58 4,688.01 1,635.66 5,970,564.26 351,249.30 1.37 3,434.48 MWD+IFR-AK-CAZ-SC(5)
7,254.97 64.37 15.58 4,336.65 4,265.74 4,768.99 1,658.24 5,970,644.76 351,273.50 0.20 3,496.38 MWD+IFR-AK-CAZ-SC(5)
7,349.81 64.39 16.28 4,377.66 4,306.75 4,851.22 1,681.71 5,970,726.50 351,298.62 0.67 3,558.99 MWD+IFR-AK-CAZ-SC(5)
7,443.90 64.50 17.86 4,418.25 4,347.34 4,932.36 1,706.63 5,970,807.12 351,325.15 1.52 3,619.98 MWD+IFR-AK-CAZ-SC(5)
7,537.89 64.55 19.53 4,458.68 4,387.77 5,012.74 1,733.83 5,970,886.92 351,353.95 1.60 3,679.24 MVVD+IFR-AK-CAZ-SC(5)
7,632.01 64.66 20.81 4,499.05 4,428.14 5,092.54 1,763.14 5,970,966.12 351,384.86 1.23 3,737.04 MWD+IFR-AK-CAZ-SC(5)
7,726.45 64.56 20.54 4,539.54 4,468.63 5,172.37 1,793.27 5,971,045.32 351,416.57 0.28 3,794.49 MWD+IFR-AK-CAZSC(5)
7,821 71 64.58 20.86 4,580.45 4,509.54 5,252.84 1,823.68 5,971,125.16 351,448.59 0.30 3,852.39 MWD+IFR-AK-CAZ-SC(5)
7,915.40 64.62 20.51 4,620.63 4,549.72 5,332.02 1,853.57 5,971,203.72 351,480.06 0.34 3,909.36 MWD+IFR-AK-CAZ-SC(5)
8,011.22 64.65 20.41 4,661.68 4,590.77 5,413.14 1,883.84 5,971,284.21 351,511.94 0.10 3,967.90 MVVD+IFR-AK-CAZ-SC(5)
8,104.74 64.63 20.45 4,701.74 4,630.83 5,492.33 1,913.33 5,971,362.79 351,543.02 0.04 4,025.07 MWD+IFR-AK-CAZ-SC(5)
5/31/2016 3.'41'28PM Page 4 COMPASS 5000.1 Build 74
• SLB •
Definitive Survey Report
ny. NADConversion Local Co-ordinate Reference: Well CD5-02
p Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91usft(Doyon 19)
Wstt; CD5-02 North Reference: True
' CD5-02A Survey Calculation Method: ` Minimum Curvature
CD5-02A Database: EDM Production
Suter+.
,f` / , Map Map Wildat
gInc Azi TVD 'TVOSS lei' +Et-W Northing Easting DLS Sectionir"
(usft) (1 f1 (usft) (rift) (usft) (usft) (ft) (ft) (°i100') (ft) Survey Tool Name'
8,197.85 64.56 20.57 4,741.68 4,670.77 5,571.11 1,942.80 5,971,440.95 351,574.06 0.14 4,081.88 MWD+IFR-AK-CAZ-SC(5)
8,292.11 64.54 20.71 4,782.19 4,711.28 5,650.76 1,972.80 5,971,519.98 351,605.65 0.14 4,139.23 MWD+IFR-AK-CAZ-SC(5)
8,386.20 64.47 21.63 4,822.69 4,751.78 5,729.95 2,003.47 5,971,598.54 351,637.90 0.89 4,195.87 MWD+IFR-AK-CAZ-SC(5)
8,480.45 64.34 20.61 4,863.40 4,792.49 5,809.24 2,034.10 5,971,677.19 351,670.11 0.99 4,252.61 MWD+IFR-AK-CAZ-SC(5)
8,575.29 64.56 20.11 4,904.31 4,833.40 5,889.46 2,063.87 5,971,756.79 351,701.48 0.53 4,310.57 MWD+IFR-AK-CAZ-SC(5)
8,669.85 64.50 19.10 4,944.97 4,874.06 5,969.88 2,092.52 5,971,836.62 351,731.72 0.97 4,369.22 MWD+IFR-AK-CAZ-SC(5)
8,764.27 64.39 18.30 4,985.71 4,914.80 6,050.57 2,119.83 5,971,916.73 351,760.64 0.77 4,428.71 MWD+IFR-AK-CAZ-SC(5)
8,856.36 64.91 17.90 5,025.13 4,954.22 6,129.67 2,145.68 5,971,995.30 351,788.08 0.69 4,487.46 MWD+IFR-AK-CAZ-SC(5)
8,951.27 65.00 19.71 5,065.31 4,994.40 6,211.06 2,173.40 5,972,076.11 351,817.42 1.73 4,547.40 MWD+IFR-AK-CAZ-SC(5)
9,046.24 65.13 19.44 5,105.35 5,034.44 6,292.20 2,202.25 5,972,156.65 351,847.89 0.29 4,606.59 MWD+IFR-AK-CAZ-SC(5)
9,140.37 64.99 20.25 5,145.04 5,074.13 6,372.49 2,231.22 5,972,236.33 351,878.46 0.79 4,664.97 MWD+IFR-AK-CAZ-SC(5)
9,234.78 65.09 20.30 5,184.88 5,113.97 6,452.78 2,260.88 5,972,316.00 351,909.72 0.12 4,723.05 MWD+IFR-AK-CAZ-SC(5)
9,328.39 65.00 20.39 5,224.38 5,153.47 6,532.35 2,290.39 5,972,394.97 351,940.82 0.13 4,780.55 MWD+IFR-AK-CAZ-SC(5)
9,422.26 65.00 20.98 5,264.05 5,193.14 6,611.94 2,320.44 5,972,473.93 351,972.45 0.57 4,837.82 MWD+IFR-AK-CAZ-SC(5)
9,516.86 64.84 20.60 5,304.15 5,233.24 6,692.04 2,350.85 5,972,553.40 352,004.46 0.40 4,895.39 MWD+IFR-AK-CAZ-SC(5)
9,610.96 64.78 20.77 5,344.20 5,273.29 6,771.71 2,380.93 5,972,632.44 352,036.13 0.18 4,952.71 MVVD+IFR-AK-CAZ-SC(5)
9,705.84 64.97 20.74 5,384 49 5,313.58 6,852.03 2,411.37 5,972,712.14 352,068.17 0.20 5,010.47 MWD+IFR-AK-CAZ-SC(5)
9,799.43 65.04 20.61 5,424.03 5,353.12 6,931.40 2,441.32 5,972,790.88 352,099.70 0.15 5,067.58 MWD+IFR-AK-CAZ-SC(5)
9,894.11 65.00 19.59 5,464.02 5,393.11 7,011.99 2,470.82 5,972,870.86 352,130.80 0.98 5,126.00 MWD+IFR-AK-CAZ-SC(5)
9,987.56 64.97 18.35 5,503.53 5,432.62 7,092.07 2,498.34 5,972,950.37 352,159.93 1.20 5,184.86 MWD+IFR-AK-CAZ-SC(5)
10,081.55 64.93 18.04 5,543.33 5,472.42 7,172.96 2,524.93 5,973,030.70 352,188.13 0.30 5,244.86 MWD+IFR-AK-CAZ-SC(5)
10,175.01 64.90 17.10 5,582.95 5,512.04 7,253.66 2,550.48 5,973,110.86 352,215.29 0.91 5,305.16 MWD+IFR-AK-CAZ-SC(5)
10,268.88 64.97 15.94 5,622.72 5,551.81 7,335.18 2,574.66 5,973,191.87 352,241.10 1.12 5,366.82 MWD+IFR-AK-CAZ-SC(5)
10,362.70 65.07 16.35 5,662.34 5,591.43 7,416.87 2,598.31 5,973,273.07 352,266.38 0.41 5,428.87 MWD+IFR-AK-CAZ-SC(5)
10,456.06 65.07 16.19 5,701.70 5,630.79 7,498.14 2,622.03 5,973,353.84 352,291.72 0.16 5,490.51 MWD+IFR-AK-CAZ-SC(5)
10,549.71 64.98 15.78 5,741.24 5,670.33 7,579.75 2,645.41 5,973,434.96 352,316.72 0.41 5,552.62 MWD+IFR-AK-CAZ-SC(5)
10,643.31 64.52 15.97 5,781.16 5,710.25 7,661.18 2,668.56 5,973,515.90 352,341.51 0.52 5,614.66 MWD+IFR-AK-CAZ-SC(5)
10,737.14 64.53 16.40 5,821.52 5,750.61 7,742.53 2,692.17 5,973,596.76 352,366.74 0.41 5,676.42 MWD+IFR-AK-CAZ-SC(5)
10,830.73 64.53 17.15 5,861.77 5,790.86 7,823.42 2,716.56 5,973,677.14 352,392.74 0.72 5,737.43 MW0+IFR-AK-CAZ-SC(5)
10,924.38 64.57 17.87 5,902.01 5,831.10 7,904.07 2,742.00 5,973,757.25 352,419.79 0.70 5,797.73 MWD+IFR-AK-CAZ-SC(5)
11,018.14 64.63 17.21 5,942.23 5,871.32 7,984.82 2,767.53 5,973,837.48 352,446.93 0.64 5,858.10 MWD+IFR-AK-CAZ-SC(5)
11,111.87 64.46 16.95 5,982.52 5,911.61 8,065.72 2,792.38 5,973,917.86 352,473.40 0.31 5,918.90 MWD+IFR-AK-CAZ-SC(5)
11,205.39 64.55 18.11 6,022.77 5,951.86 8,146.21 2,817.81 5,973,997.82 352,500.43 1.12 5,979.07 MWD+IFR-AK-CAZ-SC(5)
11,299.08 64.46 19.73 6,063.10 5,992.19 8,226.21 2,845.23 5,974,077.24 352,529.45 1.56 6,037.90 MWD+IFR-AK-CAZ-SC(5)
11,392.62 64.47 20.87 6,103.42 6,032.51 8,305.37 2,874.51 5,974,155.79 352,560.31 1.10 6,095.14 MWD+IFR-AK-CAZ-SC(5)
11,486.42 64.56 21.91 6,143.78 6,072.87 8,384.21 2,905.39 5,974,233.99 352,592.76 1.01 6,151.36 MWD+IFR-AK-CAZ-SC(5)
11,580.30 64.54 22.36 6,184.13 6,113.22 8,462.73 2,937.33 5,974,311.85 352,626.26 0.43 6,206.83 MWD+IFR-AK-CAZ-SC(5)
11,674.33 64.46 22.52 6,224.61 6,153.70 8,541.17 2,969.73 5,974,389.62 352,660.22 0.18 6,262.01 MWD+IFR-AK-CAZ-SC(5)
11,768.58 64.46 22.42 6,265.24 6,194.33 8,619.76 3,002.23 5,974,467.53 352,694.29 0.10 6,317.27 MWD+IFR-AK-CAZ-SC(5)
11,861.69 64.50 21.80 6,305.36 6,234.45 8,697.60 3,033.86 5,974,544.72 352,727.47 0.60 6,372.28 MWD+IFR-AK-CAZ-SC(5)
5/31/2016 3'41'2BPM Page 5 COMPASS 5000.1 Build 74
• SLB •
Definitive Survey Report
Company: NADConversion Local Co-ordinate Reference: Well CD5-02
Project Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well:` CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Survey
Map Map Vertical
MD Inc Azi TVD TVDSS +NI$ +E{W Northing Easting DLS Section
(usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/10(y) (ft) Survey Tool Name
11,955.72 64.46 21.03 6,345.87 6,274.96 8,776.60 3,064.84 5,974,623.08 352,760.03 0.74 6,428.60 MWD+IFR-AK-CAZ-SC(5)
12,048.98 64.46 20.63 6,386.08 6,315.17 8,855.25 3,094.76 5,974,701.10 352,791.52 0.39 6,485.09 MWD+IFR-AK-CAZ-SC(5)
12,142.16 64.46 19.46 6,426.25 6,355.34 8,934.23 3,123.58 5,974,779.48 352,821.91 1.13 6,542.38 MWD+IFR-AK-CAZ-SC(5)
12,236.62 65.01 18.82 6,466.57 6,395.66 9,014.93 3,151.59 5,974,859.60 352,851.52 0.85 6,601.57 MWD+IFR-AK-CAZ-SC(5)
12,330.18 64.88 19.55 6,506.19 6,435.28 9,094.98 3,179.44 5,974,939.07 352,880.97 0.72 6,660.25 MWD+IFR-AK-CAZ-SC(5)
12,423.70 65.01 19.79 6,545.79 6,474.88 9,174.75 3,207.95 5,975,018.25 352,911.08 0.27 6,718.38 MWD+IFR-AK-CAZ-SC(5)
12,517.46 65.01 18.71 6,585.41 6,514.50 9,254.98 3,235.97 5,975,097.90 352,940.70 1.04 6,777.15 MWD+IFR-AK-CAZ-SC(5)
12,611.56 64.91 18.21 6,625.23 6,554.32 9,335.85 3,262.97 5,975,178.20 352,969.31 0.49 6,836.95 MVVD+IFR-AK-CAZ-SC(5)
12,705.00 65.04 17.31 6,664.76 6,593.85 9,416.48 3,288.79 5,975,258.30 352,996.74 0.88 6,897.07 MWD+IFR-AK-CAZ-SC(5)
12,798.22 65.01 16.69 6,704.12 6,633.21 9,497.29 3,313.50 5,975,338.59 353,023.06 0.60 6,957.85 MWD+IFR-AK-CAZ-SC(5)
12,892.14 65.04 15.62 6,743.78 6,672.87 9,579.07 3,337.19 5,975,419.87 353,048.38 1.03 7,019.96 MWD+IFR-AK-CAZ-SC(5)
12,985.83 65.07 15.33 6,783.29 6,712.38 9,660.94 3,359.85 5,975,501.26 353,072.68 0.28 7,082.62 MWD+IFR-AK-CAZ-SC(5)
13,079.99 65.01 16.97 6,823.03 6,752.12 9,742.93 3,383.60 5,975,582.75 353,098.06 1.58 7,144.89 MWD+IFR-AK-CAZ-SC(5)
13,174.22 65.03 18.03 6,862.82 6,791.91 9,824.39 3,409.28 5,975,663.68 353,125.37 1.02 7,205.81 MWD+IFR-AK-CAZ-SC(5)
13,267.06 65.10 17.94 6,901.96 6,831.05 9,904.46 3,435.27 5,975,743.21 353,152.96 0.12 7,265.36 MVVD+IFR-AK-CAZ-SC(5)
13,360.23 65.21 18.15 6,941.11 6,870.20 9,984.85 3,461.46 5,975,823.05 353,180.76 0.24 7,325.10 MWD+IFR-AK-CAZ-SC(5)
13,454.36 66.25 15.89 6,979.80 6,908.89 10,066.90 3,486.57 5,975,904.57 353,207.50 2.45 7,386.80 MVVD+IFR-AK-CAZ-SC(5)
13,548.12 67.43 13.85 7,016.68 6,945.77 10,150.21 3,508.69 5,975,987.41 353,231.28 2.36 7,450.99 MWD+IFR-AK-CAZ-SC(5)
13,641.45 67.37 12.22 7,052.55 6,981.64 10,234.15 3,528.12 5,976,070.94 353,252.39 1.61 7,516.96 MWD+IFR-AK-CAZ-SC(5)
13,734.73 67.57 10.04 7,088.30 7,017.39 10,318.68 3,544.75 5,976,155.12 353,270.71 2.17 7,584.73 MWD+IFR-AK-CAZ-SC(5)
13,828.66 68.58 7.28 7,123.37 7,052.46 10,404.81 3,557.86 5,976,240.96 353,285.54 2.93 7,655.52 MWD+IFR-AK-CAZ-SC(5)
13,922.51 69.16 4.61 7,157.21 7,086.30 10,491.87 3,566.92 5,976,327.82 353,296.35 2.72 7,728.98 MVVD+IFR-AK-CAZ-SC(5)
14,015.86 71.24 2.49 7,188.83 7,117.92 10,579.53 3,572.35 5,976,415.34 353,303.53 3.09 7,804.61 MWD+IFR-AK-CAZ-SC(5)
14,109.74 72.17 1.17 7,218.30 7,147.39 10,668.61 3,575.19 5,976,504.34 353,308.16 1.66 7,882.70 MVVD+IFR-AK-CAZ-SC(5)
14,203.20 73.56 359.42 7,245.84 7,174.93 10,757.92 3,575.65 5,976,593.61 353,310.40 2.33 7,962.06 MWD+IFR-AK-CAZ-SC(5)
14,297.60 74.82 357.41 7,271.56 7,200.65 10,848.70 3,573.13 5,976,684.42 353,309.70 2.45 8,044.10 MWD+IFR-AK-CAZ-SC(5)
14,391.41 76.65 353.89 7,294.68 7,223.77 10,939.34 3,566.22 5,976,775.17 353,304.62 4.13 8,127.99 MWD+IFR-AK-CAZ-SC(5)
14,485.80 79.80 349.28 7,313.95 7,243.04 11,030.70 3,552.69 5,976,866.79 353,292.91 5.83 8,215.54 M1.ND+IFR-AK-CAZ-SC(5)
14,579.41 80.82 347.43 7,329.71 7,258.80 11,121.07 3,534.06 5,976,957.50 353,276.10 2.23 8,304.52 MWD+IFR-AK-CAZ-SC(5)
14,638.89 80.89 346.75 7,339.16 7,268.25 11,178.31 3,520.94 5,977,014.99 353,264.13 1.13 8,361.48 MWD+IFR-AK-CAZ-SC(5)
14,694.60 82.26 346.19 7,347.33 7,276.42 11,231.89 3,508.05 5,977,068.81 353,252.32 2.65 8,415.07 INC+TREND(6)
r F.rt
::t1.4/8"X 9-718"by 11"
14,705.18 82.52 346.09 7,348.73 7,277.82 11,242.07 3,505.54 5,977,079.04 353,250.01 2.65 8,425.28 INC+TREND(6)
14,800.56 82.63 345.15 7,361.05 7,290.14 11,333.69 3,482.05 5,977,171.10 353,228.37 0.98 8,517.57 MWD+IFR-AK-CAZ-SC(7)
14,896.02 82.73 346.07 7,373.22 7,302.31 11,425.40 3,458.52 5,977,263.26 353,206.68 0.96 8,609.97 MWD+IFR-AK-CAZ-SC(7)
14,903.65 83.03 345.72 7,374.16 7,303.25 11,432.74 3,456.67 5,977,270.64 353,204.98 6.05 8,617.35 MWD+IFR-AK-CAZ-SC(7)
4112"'x6314 '.
14,991.28 86.53 341.72 7,382.13 7,311.22 11,516.48 3,432.21 5,977,354.84 353,182.20 6.05 8,703.07 MWD+IFR-AK-CAZ-SC(7)
15,086.72 87.45 341.68 7,387.14 7,316.23 11,606.96 3,402.28 5,977,445.90 353,154.10 0.96 8,797.28 MWD+IFR-AK-CAZ-SC(7)
15,182.10 89.13 339.29 7,389.99 7,319.08 11,696.82 3,370.44 5,977,536.37 353,124.06 3.06 8,891.79 MWD+IFR-AK-CAZ-SC(7)
5/31/2016 3:41:28PM Page 6 COMPASS 5000.1 Build 74
• SLB •
Definitive Survey Report
Company: NADConversion Local Co-ordinate Reference: Well CD5-02
Project; Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Cit lculatit�kt Method -` 'Minimum Curvature
•
Design: CD5-02A Database:', EDM Production
Survey
Map Map Ver(tcel
MD % ® 'N/$ +E/-W Northing Easting DLS Section
( 1$1 r r !M ) (usft) (ft) (ft) 0100') (ft) Survey Too(Name
15,277.63 91.92 337.35 7,389.12 7,318.21 11,785.57 3,335.15 5,977,625.80 353,090 57 3.56 8,986.89 MWD+IFR-AK-CAZ-SC(7)
15,372.06 91.30 336.64 7,386.46 7,315.55 11,872.46 3,298.27 5,977,713.40 353,055.43 1.00 9,081.05 MWD+IFR-AK-CAZ-SC(7)
15,467.88 90.64 336.36 7,384.84 7,313.93 11,960.32 3,260.06 5,977,802.00 353,019.00 0.75 9,176.68 MWD+IFR-AK-CAZ-SC(7)
15,562.83 90.19 334.82 7,384.15 7,313.24 12,046.77 3,220.83 5,977,889.22 352,981.51 1.69 9,271.53 MWD+IFR-AK-CAZ-SC(7)
15,658.54 90.20 333.60 7,383.83 7,312.92 12,132.95 3,179.19 5,977,976.21 352,941.60 1.27 9,367.22 MWD+IFR-AK-CAZ-SC(7)
15,754.40 90.47 332.23 7,383.27 7,312.36 12,218.29 3,135.54 5,978,062.41 352,899.68 1.46 9,463.07 MWD+IFR-AK-CAZ-SC(7)
15,849.11 90.96 331.16 7,382.08 7,311.17 12,301.67 3,090.64 5,978,146.66 352,856.46 1.24 9,557.75 MVVD+IFR-AK-CAZ-SC(7)
15,944.62 91.03 330.32 7,380.43 7,309.52 12,384.98 3,043.96 5,978,230.88 352,811.47 0.88 9,653.17 MWD+IFR-AK-CAZ-SC(7)
16,041.42 90.17 330.23 7,379.41 7,308.50 12,469.04 2,995.97 5,978,315.88 352,765.17 0.89 9,749.85 MWD+IFR-AK-CAZ-SC(7)
16,136.33 89.30 329.43 7,379.85 7,308.94 12,551.09 2,948.27 5,978,398.86 352,719.13 1.25 9,844.61 MWD+IFR-AK-CAZ-SC(7)
16,231.27 88.79 327.31 7,381.43 7,310.52 12,631.91 2,898.49 5,978,480.66 352,670.99 2.30 9,939.23 MWD+IFR-AK-CAZ-SC(7)
16,326.82 88.73 327.14 7,383.50 7,312.59 12,712.23 2,846.78 5,978,561.99 352,620.90 0.19 10,034.27 MWD+IFR-AK-CAZ-SC(7)
16,421.37 87.99 327.13 7,386.21 7,315.30 12,791.61 2,795.49 5,978,642.38 352,571.21 0.78 10,128.28 MWD+IFR-AK-CAZ-SC(7)
16,516.28 88.50 327.49 7,389.11 7,318.20 12,871.45 2,744.26 5,978,723.23 352,521.59 0.66 10,222.68 MWD+IFR-AK-CAZ-SC(7)
16,612.09 88.10 327.65 7,391.96 7,321.05 12,952.28 2,692.90 5,978,805.07 352,471.87 0.45 10,318.02 MWD+IFR-AK-CAZ-SC(7)
16,707.39 88.52 326.90 7,394.77 7,323.86 13,032.42 2,641.40 5,978,886.21 352,421.99 0.90 10,412.80 MWD+IFR-AK-CAZ-SC(7)
16,802.85 88.78 326.89 7,397.02 7,326.11 13,112.36 2,589.28 5,978,967.18 352,371.49 0.27 10,507.69 MWD+IFR-AK-CAZ-SC(7)
16,897.48 90.07 326.52 7,397.97 7,327.06 13,191.46 2,537.33 5,979,047.29 352,321.14 1.42 10,601.75 MWD+IFR-AK-CAZ-SC(7)
16,993.13 90.41 326.20 7,397.57 7,326.66 13,271.09 2,484.35 5,979,127.96 352,269.76 0.49 10,696.75 MWD+IFR-AK-CAZ-SC(7)
17,088.44 90.37 327.56 7,396.92 7,326.01 13,350.91 2,432.27 5,979,208.80 352,219.30 1.43 10,791.52 MWD+IFR-AK-CAZ-SC(7)
17,183.65 90.67 329.81 7,396.05 7,325.14 13,432.24 2,382.79 5,979,291.10 352,171.47 2.38 10,886.45 MWD+IFR-AK-CAZ-SC(7)
17,279.11 91.39 331.60 7,394.34 7,323.43 13,515.47 2,336.09 5,979,375.25 352,126.45 2.02 10,981.81 MWD+IFR-AK-CAZ-SC(7)
17,374.41 92.69 333.20 7,390.94 7,320.03 13,599.87 2,291.97 5,979,460.51 352,084.03 2.16 11,077.04 MVVD+IFR-AK-CAZ-SC(7)
17,469.90 92.38 334.38 7,386.72 7,315.81 13,685.46 2,249.84 5,979,546.92 352,043.63 1.28 11,172.43 MWD+IFR-AK-CAZ-SC(7)
17,565.11 90.27 335.38 7,384.52 7,313.61 13,771.63 2,209.44 5,979,633.88 352,004.96 2.45 11,267.55 MWD+IFR-AK-CAZ-SC(7)
17,660.35 91.16 336.01 7,383.33 7,312.42 , 13,858.42 2,170.24 5,979,721.43 351,967.51 1.14 11,362.68 MWD+IFR-AK-CAZ-SC(7)
17,756.34 91.86 337.23 7,380.80 7,309.89 13,946.50 2,132.16 5,979,810.25 351,931.21 1.46 11,458.44 MWD+IFR-AK-CAZ-SC(7)
17,851.20 89.07 337.91 7,380.03 7,309.12 14,034.17 2,095.97 5,979,898.62 351,896.79 3.03 11,552.99 MWD+IFR-AK-CAZ-SC(7)
17,946.61 89.22 337.58 7,381.45 7,310.54 14,122.46 2,059.84 5,979,987.61 351,862.44 0.38 11,648.06 MWD+IFR-AK-CAZ-SC(7)
18,042.17 90.76 336.40 7,381.47 7,310.56 14,210.42 2,022.49 5,980,076.29 351,826.86 2.03 11,743.38 MWD+IFR-AKCAZ-SC(7)
18,137.04 91.66 335.78 7,379.47 7,308.56 14,297.12 1,984.05 5,980,163.74 351,790.17 1.15 11,838.09 MWD+IFR-AK-CAZ-SC(7)
18,233.10 91.08 334.89 7,377.17 7,306.26 14,384.39 1,943.97 5,980,251.79 351,751.85 1.11 11,934.04 MVVD+IFR-AK-CAZ-SC(7)
18,328.85 91.05 333.50 7,375.39 7,304.48 14,470.58 1,902.30 5,980,338.79 351,711.92 1.45 12,029.75 MWD+IFR-AK-CAZ-SC(7)
18,422.92 91.44 332.28 7,373.35 7,302.44 14,554.29 1,859.44 5,980,423.34 351,670.75 1.36 12,123.80 MWD+IFR-AK-CAZ-SC(7)
18,518.07 91.67 332.85 7,370.76 7,299.85 14,638.71 1,815.62 5,980,508.61 351,628.63 0.65 12,218.91 MWD+IFR-AK-CAZ-SC(7)
18,613.24 92.23 332.52 7,367.53 7,296.62 14,723.22 1,771.97 5,980,593.97 351,586.69 0.68 12,314.02 MVVD+IFR-AK-CAZ-SC(7)
18,708.23 92.05 332.66 7,363.98 7,293.07 14,807.48 1,728.28 5,980,679.09 351,544.69 0.24 12,408.94 MWD+IFR-AK-CAZ-SC(7)
18,803.79 92.07 332.88 7,360.54 7,289.63 14,892.40 1,684.58 5,980,764.86 351,502.71 0.23 12,504.44 MWD+IFR-AK-CAZ-SC(7)
18,898.92 90.28 333.20 7,358.59 7,287.68 14,977.17 1,641.46 5,980,850.47 351,461.30 1.91 12,599.55 MVVD+IFR-AK-CAZ-SC(7)
18,993.36 90.51 333.47 7,357.94 7,287.03 15,061.56 1,599.08 5,980,935.69 351,420.62 0.38 12,693.98 MWD+IFR-AK-CAZ-SC(7)
5/31/2016 3.'41:28PM Page 7 COMPASS 5000.1 Build 74
• SLB •
Definitive Survey Report
_..e.......-- ,.mss
Company: NADConversion Local Co-ordinate Reference: Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Survey
d :-*1 . Map Map Cap;,,..,,
MD Inc Awe# VOSS +N/-S +E/-W Northing Easting DLS Section
(usft) () r) ; :,. .::(b�� (usk ,� (usft) (ft) (ft) (°f1OO (ft) Survey Tool Name
0,:,.„::4:44-
19,088
4,vim
19,08829 90.34 334.21 7,357.24 7,286.33 15,146.77 1,557.23 5,981,021 70 351,380.49 0.80 12,788.90 MWD+IFR-AK-CAZ-SC(7)
19,184.57 89.99 335.03 7,356.96 7,286.05 15,233.75 1,515.96 5,981,109.49 351,340.98 0.93 12,885.14 MWD+IFR-AK-CAZ-SC(7)
19,280.54 90.28 334.36 7,356.74 7,285.83 15,320.51 1,474.94 5,981,197.05 351,301.71 0.76 12,981.07 MVVD+IFR-AK-CAZ-SC(7)
19,375.26 89.84 335.10 7,356.64 7,285.73 15,406.17 1,434.51 5,981,283.49 351,263.00 0.91 13,075.74 MWD+IFR-AK-CAZ-SC(7)
19,470.92 90.42 335.06 7,356.42 7,285.51 15,492.92 1,394.20 5,981,371.03 351,224.44 0.61 13,171.34 MWD+IFR-AK-CAZ-SC(7)
19,566.20 89.92 333.67 7,356.14 7,285.23 15,578.82 1,352.98 5,981,457.73 351,184.96 1.55 13,266.59 MWD+IFR-AK-CAZ-SC(7)
19,661.88 89.63 331.81 7,356.51 7,285.60 15,663.87 1,309.16 5,981,543.64 351,142.85 1.97 13,362.26 MWD+IFR-AK-CAZ-SC(7)
19,756.90 90.72 331.55 7,356.22 7,285.31 15,747.51 1,264.08 5,981,628.16 351,099.46 1.18 13,457.26 MWD+IFR-AK-CAZ-SC(7)
19,851.65 91.31 331.43 7,354.54 7,283.63 15,830.76 1,218.86 5,981,712.29 351,055.93 0.64 13,551.96 MWD+IFR-AK-CAZ-SC(7)
19,947.51 91.22 330.77 7,352.43 7,281.52 15,914.66 1,172.55 5,981,797.10 351,011.30 0.69 13,647.74 MWD+IFR-AK-CAZ-SC(7)
20,043.00 91.63 330.48 7,350.05 7,279.14 15,997.85 1,125.72 5,981,881.20 350,966.16 0.53 13,743.12 MWD+IFR-AK-CAZ-SC(7)
20,137.95 90.34 332.24 7,348.42 7,277.51 16,081.16 1,080.22 5,981,965.40 350,922.34 2.30 13,838.01 MWD+IFR-AK-CAZ-SC(7)
20,233.02 89.08 332.63 7,348.90 7,277.99 16,165.44 1,036.23 5,982,050.54 350,880.05 1.39 13,933.07 MWD+IFR-AK-CAZ-SC(7)
20,328.02 89.18 332.16 7,350.34 7,279.43 16,249.62 992.22 5,982,135.57 350,837.73 0.51 14,028.06 MWD+IFR-AK-CAZ-SC(7)
20,422.84 88.72 334.98 7,352.08 7,281.17 16,334.50 950.02 5,982,221.28 350,797.25 3.01 14,122.85 MWD+IFR-AK-CAZ-SC(7)
20,518.71 88.83 333.79 7,354.13 7,283.22 16,420.93 908.59 5,982,308.51 350,757.56 1.25 14,218.66 MWD+IFR-AK-CAZ-SC(7)
20,613.26 88.99 333.90 7,355.93 7,285.02 16,505.78 866.92 5,982,394.18 350,717.60 0.21 14,313.19 MWD+IFR-AK-CAZ-SC(7)
20,709.19 89.76 332.15 7,356.98 7,286.07 16,591.27 823.41 5,982,480.51 350,675.82 1.99 14,409.11 MWD+IFR-AK-CAZ-SC(7)
20,804.26 90.21 331.98 7,357.00 7,286.09 16,675.26 778.87 5,982,565.37 350,632.97 0.51 14,504.16 MWD+IFR-AK-CAZ-SC(7)
20,900.16 89.91 330.48 7,356.90 7,285.99 16,759.32 732.71 5,982,650.33 350,588.52 1.60 14,600.02 MWD+IFR-AK-CAZ-SC(7)
20,994.46 90.78 328.88 7,356.33 7,285.42 16,840.71 685.11 5,982,732.66 350,542.56 1.93 14,694.15 MWD+IFR-AK-CAZ-SC(7)
21,089.89 89.43 330.11 7,356.16 7,285.25 16,922.93 636.67 5,982,815.83 350,495.78 1.91 14,789.40 MWD+IFR-AK-CAZ-SC(7)
21,185.21 92.10 330.80 7,354.89 7,283.98 17,005.84 589.68 5,982,899.66 350,450.46 2.89 14,884.61 MWD+IFR-AK-CAZ-SC(7)
21,281.17 90.90 331.37 7,352.37 7,281.46 17,089.81 543.30 5,982,984.53 350,405.78 1.38 14,980.48 MWD+IFR-AK-CAZ-SC(7)
21,376.71 91.02 331.70 7,350.77 7,279.86 17,173.79 497.77 5,983,069.40 350,361.94 0.37 15,075.97 MWD+IFR-AK-CAZ-SC(7)
21,472.20 91.19 330.96 7,348.93 7,278.02 17,257.55 451.96 5,983,154.06 350,317.83 0.79 15,171.41 MWD+IFR-AK-CAZ-SC(7)
21,567.37 91.35 331.40 7,346.82 7,275.91 17,340.91 406.10 5,983,238.32 350,273.65 0.49 15,266.50 MWD+IFR-AK-CAZ-SC(7)
21,662.92 90.30 333.19 7,345.45 7,274.54 17,425.50 361.68 5,983,323.77 350,230.94 2.17 15,362.03 MWD+IFR-AK-CAZ-SC(7)
21,759.64 89.49 333.11 7,345.62 7,274.71 17,511.79 318.00 5,983,410.91 350,188.99 0.84 15,458.75 MWD+IFR-AK-CAZ-SC(7)
21,854.74 90.32 333.03 7,345.78 7,274.87 17,596.57 274.93 5,983,496.54 350,147.63 0.88 15,553.85 MWD+IFR-AK-CAZ-SC(7)
21,948.62 89.85 334.78 7,345.64 7,274.73 17,680.88 233.63 5,983,581.65 350,108.04 1.93 15,647.71 MWD+IFR-AK-CAZ-SC(7)
22,106.00 89.85 334.78 7,346.05 7,275.14 17,823.26 166.58 5,983,725.33 350,043.86 0.00 15,805.02 PROJECTED to TD
5/31/2016 3'41'28PM Page 8 COMPASS 5000.1 Build 74
• •
Final Definitive Survey
Verified and Signed-off
All targets and/or well position objectives have been achieved.
Yes ❑ No
I have checked to the best of my ability that the following data is correct:
2 Surface Coordinates
0 Declination & Convergence
GRS Survey Corrections Digitally signed by Brij
El Survey Tool Codes Hall-Potnis
Date:2016.05.31
SLB DE: ti 15:43:20-08'00'
William Ear hart Digitally signed by William Earhart
Client Representative: Date:2016.oss„e:,r„-08�
Date:
•: - Cement Detail Report
OFR
h✓��� CD5-02
ConocoPhilllps
String: Surface Casing Cement
Job: DRILLING ORIGINAL, 3/27/2016 14:00
Cement Details
Description Cementing Start Date Cementing End Date Wellbore Name
Surface Casing Cement 3/30/2016 09:07 3/30/2016 10:58 CD5-02A
Comment
.5 ppb Cemnet in first 100 bbls lead pumped to prevent possible losses.
Cement Stages
Stage#1
Description Objective Top Depth(ftKB) Bottom Depth(ftKB) Full Return? Vol Cement...Top Plug? Btm Plug?
Surface Casing Cement- Cement to surface 39.0 1,898.0 Yes 155.0 No Yes
Lead
Q Pump Init(bbl/m...Q Pump Final(bbl/...Q Pump Avg(bbl/... P Pump Final(psi) P Plug Bump(psi) Recip? Stroke(ft) Rotated? Pipe RPM(rpm)
7 5 7 283.0 Yes 8.00 No
Tagged Depth(ftKB) Tag Method Depth Plug Drilled Out To(ftKB) Drill Out Diameter(in)
Comment
Cement Fluids&Additives
Fluid
Fluid Type Fluid Description Estimated Top(ftKB) Est Btm(ftKB) Amount(sacks) Class Volume Pumped(bbl)
Lead Cement 39.0 1,898.0 921 LiteCRETE 313.2
Yield(ft'/sack) Mix H2O Ratio(gal/sa... Free Water(%) Density(lb/gal) Plastic Viscosity(Pa•s) Thickening Time(hr) CmprStr 1(psi)
1.91 6.82 0.00 11.00 259.3 4.66 50.0
Additives
Additive Type Concentration Conc Unit label
Antifoam D046 0.2 %BWOB
Additive Type Concentration Conc Unit label
Fluid Loss Control D167 0.5 %BWOB
Additive Type Concentration Conc Unit label
Retarder D177 0.005 gal/sx
Additive Type Concentration Conc Unit label
Dispersant D230 0.06 gal/sx
Stage#2
Description Objective Top Depth(ftKB) Bottom Depth(ftKB) Full Return? Vol Cement...Top Plug? Btm Plug?
Surface Casing Cement- 1,898.0 2,424.0 Yes Yes No
Tail
Q Pump Init(bbl/m...Q Pump Final(bbl/...Q Pump Avg(bbl/... P Pump Final(psi) P Plug Bump(psi) Recip? Stroke(ft) Rotated? Pipe RPM(rpm)
4 3 4 161.0 550.0 Yes 8.00 No
Tagged Depth(ftKB) Tag Method Depth Plug Drilled Out To(ftKB) Drill Out Diameter(in)
Comment
Cement Fluids 8.Additives l
Fluid
Fluid Type Fluid Description Estimated Top(ftKB) Est Btm(ftKB) Amount(sacks) Class Volume Pumped(bbl)
Tail Cement 1,898.0 2,424.0 285 G 59.3
Yield(ft'/sack) Mix H2O Ratio(gal/sa... Free Water(%) Density(lb/gal) Plastic Viscosity(Pa.$) Thickening Time(hr) CmprStr 1(psi)
1.17 5.09 15.80 135.4 3.83 50.0
Additives
Additive Type Concentration Conc Unit label
Antifoam D046 0.2 %BWOC
Additive Type Concentration Conc Unit label
Dispersant D065 0.3 %BWOC
Additive Type Concentration Conc Unit label
Fluid Loss Control D167 0.7 %BWOC
Additive Type Concentration Conc Unit label
Dispersant D230 0.13 gal/sx
Additive Type Concentration Conc Unit label
Acelerator(Calcium Chloride) S002 0.8 %BWOC
Page 1/1 Report Printed: 6/17/2016
Cement Detail Report
v, Drirbing
yok*AVVElits
CD5-02
ConocoPhillips
String: Intermediate Casing Cement
Job: DRILLING ORIGINAL; 3/27/2016 14:00
Cement Details
Description Cementing Start Date Cementing End Date Wellbore Name
Intermediate Casing Cement 5/16/2016 02:00 5/17/2016 04:45 CD5-02A
Comment
Did not bump plug. Pump 666.69 bbls(includes 1/2 shoe track)
Cement Stages
Stage#1
Description Objective Top Depth(ftKB) Bottom Depth(ftKB) Full Return? Vol Cement...Top Plug? Btm Plug?
Intermediate Casing Isolate Shoe 13,750.0 14,694.6 Yes Yes No
Cement
Q Pump Init(bbl/m...Q Pump Final(bbl/...Q Pump Avg(bbl/... P Pump Final(psi) P Plug Bump(psi) Recip? Stroke(ft) Rotated? Pipe RPM(rpm)
6 3 6 900.0 No No
Tagged Depth(ftKB) Tag Method Depth Plug Drilled Out To(ftKB) Drill Out Diameter(in)
Comment
Did not bump plug. Pump 666.69 bbls(includes 1/2 shoe track)
Cement Fluids&Additives
Fluid
Fluid Type Fluid Description Estimated Top(ftKB) Est Btm(ftKB) Amount(sacks) Class Volume Pumped(bbl)
Intermediate Cement 13,750.0 14,694.6 741 G 153.0
Yield(W/sack) Mix H2O Ratio(gal/sa... Free Water(%) Density(lb/gal) Plastic Viscosity(Pa•s) Thickening Time(hr) CmprStr 1 (psi)
1.16 5.09 15.80 4.50 500.0
Additives
Additive Type Concentration Conc Unit label
Stage#2
Description Objective Top Depth(ftKB) Bottom Depth(ftKB) Full Return? Vol Cement...Top Plug? Btm Plug?
Intermediate Casing Isolate Qannik 6,014.0 6,708.0 Yes Yes No
Cement
Q Pump Init(bbl/m...Q Pump Final(bbl/...Q Pump Avg (bbl/... P Pump Final(psi) P Plug Bump(psi) Recip? Stroke(ft) Rotated? Pipe RPM(rpm)
6 3 6 390.0 2,000.0 No No
Tagged Depth(ftKB) Tag Method Depth Plug Drilled Out To(ftKB) Drill Out Diameter(in)
Comment
Cement Fluids&Additives
Fluid
Fluid Type Fluid Description Estimated Top(ftKB) Est Btm(ftKB) Amount(sacks) Class Volume Pumped(bbl)
Intermediate Cement 6,014.0 6,708.0 286 G 59.0
Yield(ft'/sack) Mix H2O Ratio(gal/sa... Free Water(%) Density(lb/gal) Plastic Viscosity(Pa•s) Thickening Time(hr) CmprStr 1(psi)
1.16 5.09 15.80 4.00 500.0
Additives
Additive Type Concentration Conc Unit label
Page 1/1 Report Printed: 6/9/2016
• . pro 2/4 -04$
Loepp. Victoria T (DOA)
From: Njoku,Johnson <Johnson.Njoku@conocophillips.com>
Sent: Wednesday, May 25,2016 7:18 AM
To: Loepp,Victoria T(DOA); Kanady, Randall B
Cc: Quick, Michael J (DOA);Schwartz,Guy L(DOA)
Subject: RE:CRU CD5-02A(PTD 216-068) Sonic Log
Attachments: ConocoPhillips CD5-02ASonic Top of Cement Evaluation 480.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
Good Morning Victoria.
Please find attached the sonic memory log for CD5-02,The log shows presence of cement behind pipe from 14900ft to
11,925ft which is the depth we started the sonic logging. CPA believes that the TOC is above 11,925ft due to the large
cement excess we routinely pump on our jobs. We are looking forward to having a good discussion with you on path
forward soon.
Let me know ifyou have any questions or concerns.
Best regards,
Johnson Njoku
+907 317 1529
From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov]
Sent:Tuesday, May 24,2016 4:39 PM
To:Njoku,Johnson<Johnson.Njoku@conocophillips.com>; Kanady, Randall B<Randall.B.Kanady@conocophillips.com>
Cc:Quick, Michael J (DOA)<michael.quick@alaska.gov>;Schwartz,Guy L(DOA)<guy.schwartz@alaska.gov>
Subject: [EXTERNAL]CRU CD5-02A(PTD 216-068)Sonic Log
Njoku,
Conditional approval is granted to proceed with the completion under the following conditions:
1. Forward the memory sonic log to the AOGCC as soon as it is available for interpretation.
2. For future reference, and this is the second time CPAI has been apprised of this, Randy,we will not accept the
results of the sonic log without a definitive TOC.
3. Meeting will be scheduled to discuss alternatives to the BATT Sonic ASAP.
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil&Gas Conservation Commission
333 W.7th Ave
Anchorage,AK 99501
Work: (907)793-1247
Victoria.LoeppAa laska.qov
CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged
information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended
1
w
• S
111,
recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to
you,contact Victoria Loepp at(907)793-1247 or Victoria.Loepp@alaska.gov
From: Njoku,Johnson [mailto:Johnson.Njoku@conocophillips.com]
Sent:Tuesday, May 24, 2016 4:14 PM
To: Loepp, Victoria T(DOA)
Subject: RE: [EXTERNAL]RE: CRU CD5-02A(PTD 216-068) Sonic Log
See attached reports through FIT of 12.5ppge
Let me know ifyou have any questions or concerns.
Best regards,
Johnson Njoku
+907 317 1529
From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov]
Sent:Tuesday, May 24,2016 3:56 PM
To: Njoku,Johnson<Johnson.Njoku@conocophillips.com>
Subject: RE: [EXTERNAL]RE: CRU CD5-02A(PTD 216-068)Sonic Log
From 1st stage through FIT
From: Loepp, Victoria T(DOA)
Sent:Tuesday, May 24, 2016 3:54 PM
To: 'Njoku,Johnson'
Subject: RE: [EXTERNAL]RE: CRU CD5-02A(PTD 216-068) Sonic Log
Please send the daily operating rig report-
From: Njoku,Johnson [mailto:Johnson.Njoku@conocophillios.com]
Sent:Tuesday, May 24, 2016 3:48 PM
To: Loepp,Victoria T(DOA)
Cc: Quick, Michael 3 (DOA); Schwartz, Guy L(DOA); Alvord, Chip
Subject: RE: [EXTERNAL]RE: CRU CD5-02A(PTD 216-068) Sonic Log
Per your request, please find attached the cement job report and charts.
Let me know ifyou have any questions or concerns.
Best regards,
Johnson Njoku
+907 317 1529
From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov]
Sent:Tuesday, May 24,2016 1:05 PM
To: Njoku,Johnson<Johnson.Njoku@conocophillips.com>
Cc:Quick, Michael 1 (DOA)<michael.quick@alaska.gov>;Schwartz,Guy L(DOA)<guy.schwartz@alaska.gov>;Alvord,
Chip<Chip.Alvord@conocophillips.com>
Subject: Re: [EXTERNAL]RE: CRU CD5-02A(PTD 216-068)Sonic Log
2
• •
We're all at the SPEWRM-
Sent from my iPhone
On May 24,2016,at 11:03 AM, Njoku,Johnson<Johnson.Njoku@conocophillips.com>wrote:
We expect to be on surface sometime tonight and download the sonic memory log.
We would like to have the opportunity to visit with you in your office today.
Please let me know a good time to visit.
Best regards,
WNS Supervising Drilling Engineer
Johnson Njoku
+907 317 1529
From: Loepp,Victoria T(DOA) [mailto:victoria.Ioepp@alaska.gov]
Sent:Tuesday,May 24,2016 10:24 AM
To: Njoku,Johnson<Johnson.Nioku@conocophillips.com>
Cc:Quick, Michael J (DOA)<michael.quick@alaska.gov>;Schwartz,Guy L(DOA)
<guy.schwartz@alaska.gov>
Subject: Re: [EXTERNAL]RE:CRU CD5-02A(PTD 216-068)Sonic Log
Review of the sonic memory log is required before approval is granted to run the completion.When will
this log be available?
Sent from my iPhone
On May 23,2016,at 5:27 PM, Njoku,Johnson<Johnson.Njoku@conocophillips.com>wrote:
Hello Victoria,
Thank you for taking the time to provide comments on the real time sonic log data for
the CD5-02A Intermediate casing cement job that Will Earhart forwarded to you last
week.
Your comments that the real time sonic log should have captured the TOC is well
noted. CPA was not able to capture TOC in real-time due to the amount of rig time and
cost involved with logging higher up in the well. CPA routinely pumps a large volume of
excess cement to ensure that we are meeting the regulatory standards in 20 AAC 25.030
Casing and Cementing. The good news is that the real-time log on CD5-02A shows over
1000ft cement above the planned injection zone vs. state requirement of
500ft. Additionally, after drilling out the production casing shoe we achieved a
12.5ppge FIT. CPA believes that the 1000ft of documented cement and the 12.5ppg FIT
demonstrates good annular isolation per section 20 AAC 25.030 Casing and Cementing.
In addition, as we have provided the results of the real-time sonic log we believe we
have satisfied all the conditions in the permit to drill. While we understand that the
memory data may provide additional information concerning the height of cement,
based on the information above that we already possess,we believe the well is fit for
service.
3
MIPF
w
• •
Our plan forward is to proceed with running the completion after tripping out of hole
with the 6 3/" BHA. CPA will provide AOGCC with the memory sonic log data as soon as
this information is available.
Let me know ifyou have any questions or concerns.
Best regards,
Johnson Njoku
WNS Supervising Drilling Engineer
+907 317 1529
From: Earhart,Will C
Sent:Thursday, May 19,2016 2:27 PM
To: Njoku,Johnson<Johnson.Nioku@conocophillips.com>;Alvord,Chip
<Chip.Alvord@conocophillips.com>
Subject: FW: [EXTERNAL]RE:CRU CD5-02A(PTD 216-068)Sonic Log
From: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov>
Sent:Thursday, May 19,2016 2:12:33 PM
To: Earhart,Will C
Cc:Quick, Michael J (DOA);Schwartz,Guy L(DOA)
Subject: [EXTERNAL]RE:CRU CD5-02A(PTD 216-068)Sonic Log
Will,
As outlined in the approved PTD,we look forward to reviewing the sonic log and TOC
after you have drilled the 6-3/4" hole. Running the completion is not approved at this
time but approval will be based on the results of the memory log.
Thank you for the updates.
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil&Gas Conservation Commission
333 W.7th Ave
Anchorage,AK 99501
Work: (907)793-1247
Victoria.Loepp a(�.alaska.gov
CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from
the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of
the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized
review,use or disclosure of such information may violate state or federal law.If you are an unintended
recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is
aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or
Victoria.Loem@alaska.gov
From: Earhart, Will C [mailto:William.C.Earhart@conocophillips.com]
Sent: Thursday, May 19, 2016 12:46 PM
To: Loepp,Victoria T(DOA)
4
• i
Cc: Schwartz, Guy L(DOA); Quick, Michael J (DOA); Alvord, Chip; Njoku,Johnson
Subject: RE: CRU CD5-02A(PTD 216-068) Sonic Log
Victoria,
We performed a memory log with the sonic tool from 12,000'to 13,500' MD to ensure
we capture the TOC per the previous feedback.Given the incremental rig time
associated with running real-time vs recorded mode,we elected to break it up and only
perform real-time 500'above the proposed packer setting depth.Traditionally with
Schlumberger,we only receive recorded mode data to save costs and rig time so the
information is only available after the interval is complete.
We will provide the recorded mode sonic log and TOC as soon as the sonic LWD is laid
down following the drilling of the interval. I would anticipate that being
Monday/Tuesday of next week if drilling operations are smooth over the weekend.
In the event the tool failed or log results are unsatisfactory,we will run a wireline
cement evaluation log to examine the interval.
Thanks
Will
Will Earhart
Drilling Engineer-ConocoPhillips Alaska,Inc
William.C.Earhart@conocophillips.com
ATO-1706
Office:+1.907.265.1077
Mobile:+1.540.448.1789
From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov]
Sent:Thursday, May 19,2016 11:42 AM
To: Earhart,Will C<William.C.Earhart@conocophillips.com>
Cc:Schwartz,Guy L(DOA)<guy.schwartz@alaska.gov>; Quick, Michael J (DOA)
<michael.quick@alaska.gov>
Subject: [EXTERNAL]FW: CRU CD5-02A(PTD 216-068)Sonic Log
Will,
This log shows no TOC for reference and is very subjective. We would like logging to
commence well above the predicted TOC so a definitive TOC is apparent on the log.This
requirement was conveyed to CPAI last week when the log for 3S-613 also did not show
TOC. Please run a definitive cement evaluation log showing TOC.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil&Gas Conservation Commission
333 W.7th Ave
Anchorage,AK 99501
Work: (907)793-1247
Victoria.Loepp a(�alaska.gov
5
w
• •
CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from
the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of
the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized
review,use or disclosure of such information may violate state or federal law.If you are an unintended
recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is
aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or
Victoria.Loepp@alaska.gov
From: Earhart, Will C [mailto:William.C.EarhartPconocophillips.com]
Sent:Thursday, May 19, 2016 10:51 AM
To: Loepp,Victoria T(DOA)
Subject: CRU CD5-02A(PTD 216-068) Sonic Log
Victoria,
Attached please find the sonic log pass for cement evaluation for CRU CD5-02A(PTD
216-068).We evaluated the first stage intermediate cement job last night starting at
-13,500' MD/6,998'TVD.The top of cement appears to be above that depth per
Schlumberger's interpretation.
Full returns and no losses were experienced during the cement job.We just completed a
successful FIT of the casing shoe to 12.Sppg EMW.
We propose to set the production packer at 14,000' MD/7,184'ND.The intermediate
casing shoe was set at 14,694' MD/7,348'TVD.
Please let me know if you approve of the packer setting depth and the waiver to set
>200ft above the top perforation.
Thanks
Will
Will Earhart
Drilling Engineer-ConocoPhillips Alaska,Inc
Williann.C.Earhart(@.conocophillips.com
ATO-1706
Office:+1.907.265.1077
Mobile:+1.540.448.1789
6
W
v�nv■�'r r i. vu unw i unw rrwna, a n..
VII
0m0aO � mO FlWa
r/ C
C D r r- STATE Alaska
zmPrD caunrrRv USA _ 0 �■
xi z = ='r
-< _< t omlicn .
7,
n
Z n D % �, a
cnSD � o0 @0 l) 1 = W 0 0 CD
cp %.- c:::, 0 V 0 N)O
7 ^ P CD
013rn o moo
Cr) <
SI) So c
... f
-f,
5- mom � n
o mum�• D 0 CD
E
Z3m = 2 0
I r
o 3 ,2 �
CD cn
0
ry.
FOLD HERE: lhe well rare,location ad borehde reference data were furished by the as9cmer.
Any iberprelatim,reseadi,araysis,data,nasalis,estirretes,a reccrrrnendalicn furrshed with the services cr dhawise comrnurcated by ScNunberger th the astcmxx at
ay time in=palm with the services ae opinions based an irfererrces firm measuar>t,empirical rdaicnships,axVor assurptias;wtldh,irferences,empirical
rda6aships anclicr assure o s ae rct irfdlible axi will respect b which pro(essiaxals in the industry may dfier:Award y,Shcurtmrger c aitt ad does rrt warat the
acaracy,arectness,or campleeness of ay such inbaprefatia,research,a clysis,data,results,estimates,a recarmert icn The a.stcrer adviarvledges that it is
accepting the services"as is,"that Sdiurberger rrskes no representation or wars ty,express a implied,at ay kind a desarip on in resped them,ad fief such services
ae delivered with the explicit urderstaxtrx3 ad aperient ent that ay action taken based al the services received shell beatits own risk ad responsibility,and no dam shall be
made against Schkrrberger as a ccnsapence thereof.
vc.Order#: OP Vers: Processed by: Process Date: May. 19 2016
)cation: Tedilog Vers: 2015.3 e-rreil:jburl2@s1b.com
Remarks:
w
• •
OT- NM � LC) CDN- O
0 0 0 0 0 0 0 0 0
ro bion
eferenc
GR RMXWRT (ft) SPJ MHRT AMP 1 CSG
0 gAPI 150 1:240 0 us/ft 1 0 unitless 100
1 , , 1 1 I I , , I i
1 1 I I I I 1 , , I I f
I I 1 1 _ _ , , 1 , , I 1 1
I I I I 13425 , 1 1 , I I I 1
I I I I I I I I I I I I
1 1 1 1 1 1 , i , , I ,
_ _ , 1 1 , 1 1 1
, , I 1 , 1 , , , , 1 1
I 1 I I I I I 1 I I I f
I 1 1 1 - 1 1 1 1
I I I I i i I I
1 1 1 I 1 1 1 1
1 1 - , 1 1
I I I I I I 1 I
1 I 1 1
1 1 - 1 1
1 , , 1 1 1
1 I 1 I I 1 I
1 1 1
_ 1 ,
I i 1 I 13450 ' i i i
_ _ , 1 , , , I I
1 1 1 , , I , 1 , 1
! ! 1 ! 1 ! 1 1 1 ! 1
1 1 I I I I 1 1 I I 1 ,
I I I I I 1 I I I I I I
1 1 , I , 1 , , 1 1 1
_ _ 1
I II I I I I I I II I I I
__
I 1 1 1 , I 1 , 1 1
1
1 I 1 I 1 1 I 1 I I I I
I , I , 1 I , 1 I , I
, - - I 1 , 1
I 1 , , I 1 1 1 1 , , 1
! ! I 13475 ! ! ! !
I , I - _ I , I
I , 1 1 1 , I I 1 1 , ,
I 1 I I I 1 1 I , I I I I
I , , , 1 , 1 , 1 1 1 I
, , , , I , 1 , , 1 1 1
1 I I I 1 I 1 I I 1 I I
, I 1 , 1 , 1 , , I 1 I
1 t I f I I 1 i I I I
I
1 I / I I I 1 1 1
1 1 I 1 13500 I I 1 1
1 i 1 I _ 1111111111 1 1 1
I 1 I I '
I I I I 1 - 1 1 I
1 1
I 1 I I
1 1 1 1
! I I I _ 1 1
1 I I I
I I 1 1 1 I 1 1
_ 1
1 1 1 1
11 1 I _ 13525 111
i i 1 i —� 1 1
i i ! 11111111111V 1 1
_ 1 1 1
i i '` i i 1 1 1
i i i 111
1 I 1
- i
1 1 1 1
1 ' 1 I 13550 I 1 1
I � ,' I 1 - 1 1 1
I ! _ 1 1
1 I 1
1 , 1 1
I I I 1 1
1 1 I - 1 1
I I I I I
1 I I �_1e 1 1
13575ii
1 1 1 1 - 1 1 1 1
1 1 �.: 1 - 1 1 1 1
Schlumberger CD5-02 Real Time
Sonic Top of Cement
(TOC) Evaluation
• •
Of Cement Detail Report
CD5-02
Cnnotilips
nuke,
String: Intermediate Casing Cement
Job: DRILLING ORIGINAL, 3/27/2016 14:00
Cement Details
Description Cementing Start Date Cementing End Date Wellbore Name
Intermediate Casing Cement 5/16/2016 02:00 5/17/2016 04:45 CD5-02A
Comment
Did not bump plug. Pump 666.69 bbls(includes 1/2 shoe track)
Cement Stages
Stage#1
Description Objective Top Depth(ftKB) Bottom Depth(ftKB) Full Return? Vol Cement..Top Plug? Btm Plug?
Intermediate Casing Isolate Shoe 13,750.0 14,694.6 Yes Yes No
Cement
Q Pump Init(bbl/m...0 Pump Final(bbl/... 0 Pump Avg(bbl/... P Pump Final(psi) P Plug Bump(psi) Recip? Stroke(ft) Rotated? Pipe RPM(rpm)
6 3 6 900.0 No No
Tagged Depth(ftKB) Tag Method Depth Plug Drilled Out To(ftKB) Drill Out Diameter(in)
Comment
Did not bump plug.Pump 666.69 bbls(includes 1/2 shoe track)
Cement Fluids&Additives
Fluid
Fluid Type Fluid Description Estimated Top(ftKB) Est Btm(ftKB) Amount(sacks) Class Volume Pumped(bbl)
Intermediate Cement 13,750.0 14,694.6- 741 G 153.0
Yield(ft/sack) Mix H2O Ratio(gal/sa... Free Water(%) Density(lb/gal) Plastic Viscosity(Pam) Thickening Time(hr) CmprStr 1(psi)
1.16 5.09 15.80 4.50 500.0
Additives
Additive Type Concentration Conc Unit label
Stage#2
Description Objective Top Depth(ftKB) Bottom Depth(ftKB) Full Return? Vol Cement...Top Plug? Btm Plug?
Intermediate Casing Isolate Qannik 6,014.0 6,708.0 Yes Yes No
Cement
Q Pump Init(bbl/m...0 Pump Final(bbl/... Q Pump Avg(bbl/... P Pump Final(psi) P Plug Bump(psi) Recip? Stroke(ft) Rotated? Pipe RPM(rpm)
6 3 6 390.0 2,000.0 No No
Tagged Depth(ftKB) Tag Method Depth Plug Drilled Out To(ftKB) Drill Out Diameter(in)
Comment
Cement Fluids&Additives
Fluid
Fluid Type Fluid Description Estimated Top(ftKB) Est Btm(ftKB) Amount(sacks) Class Volume Pumped(bbl)
Intermediate Cement 6,014.0 6,708.0 286 G 59.0
Yield(ft'/sack) Mix H2O Ratio(gal/sa... Free Water(%) Density(lb/gal) Plastic Viscosity(Pa•s) Thickening Time(hr) CmprStr 1(psi)
1.16 5.09 15.80 4.00 500.0
Additives
Additive Type Concentration Conc Unit label
Page 1/1 Report Printed: 5/24/2016
Customer: • Conoco Phillips Alpine 0
Schlumberger District: PAK
Representative: Adam Dore
DS Supervisor: Todd Jaggers
Job Date:05-16-2016 Well: CD5-02A
Time Flow Rate CMT TREAT PRES CMT DENS CMT STG VOL WHP
mm:dd:yyyy:hh:mm:ss bbl/min I psi lb/gal bbl psi
05:16:2016:01:09:29 0.0 53 0.00 0.0 698
05:16:2016:01:10:44 0.0 53 0.01 0.0 703
05:16:2016:01:11:59 0.0 55 0.01 0.0 691
05:16:2016:01:13:14 0.0 53 0.01 0.0 684
05:16:2016:01:14:29 0.0 56 0.00 0.0 712
05:16:2016:01:15:44 0.0 54 0.00 0.0 709
05:16:2016:01:16:59 0.0 53 0.00 0.0 710
05:16:2016:01:18:14 0.0 53 0.01 0.0 702
05:16:2016:01:19:29 0.0 55 0.00 0.0 702
05:16:2016:01:20:44 0.0 52 0.00 0.0 699
05:16:2016:01:21:59 0.0 53 0.00 0.0 696
05:16:2016:01:23:14 0.0 55 0.00 0.0 710
05:16:2016:01:24:29 0.0 54 0.00 0.0 703
05:16:2016:01:25:44 0.0 54 0.01 0.0 701
05:16:2016:01:26:59 0.0 52 0.01 0.0 700
05:16:2016:01:28:14 0.0 61 0.00 0.0 707
05:16:2016:01:29:29 0.0 253 0.00 0.0 693
05:16:2016:01:30:44 0.0 217 0.01 0.0 690
05:16:2016:01:31:59 0.0 153 0.00 0.0 698
05:16:2016:01:33:14 0.0 178 0.00 0.0 704
05:16:2016:01:34:29 0.0 81 0.00 0.0 710
05:16:2016:01:35:44 0.0 138 8.33 0.0 712
05:16:2016:01:36:59 0.0 69 7.98 0.0 699
05:16:2016:01:38:14 0.0 61 7.88 0.0 706
05:16:2016:01:39:29 0.0 61 7.84 0.0 694
05:16:2016:01:40:44 0.0 64 7.81 0.0 705
05:16:2016:01:41:59 0.0 64 7.79 0.0 690
05:16:2016:01:43:14 0.0 62 7.77 0.0 698
05:16:2016:01:44:29 0.0 62 7.77 0.0 711
05:16:2016:01:45:44 0.0 61 7.77 0.0 710
05:16:2016:01:46:59 0.0 60 7.76 0.0 707
05:16:2016:01:48:14 0.0 60 7.75 0.0 416
05:16:2016:01:49:29 0.0 58 7.76 0.0 14
05:16:2016:01:50:07 PJSM
05:16:2016:01:50:07 0.0 59 7.76 0.0 18
05:16:2016:01:50:44 0.0 58 7.76 0.0 19
05:16:2016:01:51:59 0.0 59 7.76 0.0 19
05:16:2016:01:53:14 0.0 56 7.75 0.0 19
05:16:2016:01:54:04 Line up to CMT Unit
05:16:2016:01:54:04 0.0 58 7.76 0.0 15
05:16:2016:01:54:29 0.0 54 7.75 0.0 18
05:16:2016:01:55:43 Flood surface lines
05:16:2016:01:55:43 0.8 6 7.58 0.1 17
05:16:2016:01:55:44 0.8 5 7.57 0.2 20
05:16:2016:01:56:59 1.9 296 7.57 1.9 243
05:16:2016:01:57:23 Shut in for PT
05:16:2016:01:57:23 0.0 131 7.57 2.0 135
05:16:2016:01:58:14 0.0 1167 7.57 2.0 1215
05:16:2016:01:59:29 0.0 3930 7.56 2.0 3964
05:16:2016:01:59:50 PT lines
05:16:2016:01:59:50 0.0 3919 7.57 2.0 3936
05:16:2016:02:00:17 Bleed Off Pressure
05:16:2016:02:00:17 0.0 3912 7.56 2.0 3921
05:16:2016:02:00:44 0.0 13 7.56 2.0 18
05:16:2016:02:00:50 Reset Total,Vol= 1.99 bbl
05:16:2016:02:00:50 0.0 11 7.56 2.0 19
05:16:2016:02:01:01 Batch tub of Spacer
05:16:2016:02:01:01 0.0 184 7.56 0.0 58
05:16:2016:02:01:59 0.0 68 8.33 0.0 71
05:16:2016:02:03:14 0.0 63 8.34 0.0 70
05:16:2016:02:04:29 0.0 63 8.54 0.0 73
Page 1 of 5
Well:CD5-02A • • Job Date:05-16-2016
Time Flow RateCMT TREAT PRES CMT DENS CMT STG VOL WHP
mm:dd:yyyy:hh:mm:ss bbl/min psi lb/gal bbl psi
05:16:2016:02:05:49 Start Spacer
05:16:2016:02:05:49 0.0 64 12.69 0.0 72
05:16:2016:02:06:59 5.8 1134 13.08 3.8 500
05:16:2016:02:08:14 5.8 1062 12.44 11.1 475
05:16:2016:02:09:29 6.1 1131 12.37 18.6 473
05:16:2016:02:10:44 6.1 1126 12.63 26.3 462
05:16:2016:02:11:59 6.1 1087 12.90 33.9 434
05:16:2016:02:13:14 6.1 1036 12.38 41.6 407
05:16:2016:02:14:29 0.0 21 12.16 47.3 29
05:16:2016:02:14:44 Reset Total,Vol=47.32 bbl
05:16:2016:02:14:44 0.0 18 12.14 47.3 27
05:16:2016:02:14:50 End Spacer
05:16:2016:02:14:50 0.0 18 12.16 0.0 26
05:16:2016:02:15:00 Mix tub of cement
05:16:2016:02:15:00 0.0 17 12.09 0.0 23
05:16:2016:02:15:44 0.0 15 11.79 0.0 25
05:16:2016:02:16:59 0.0 14 14.25 0.0 25
05:16:2016:02:18:14 0.7 33 15.79 0.0 27
05:16:2016:02:18:21 Start Cement Slurry
05:16:2016:02:18:21 2.1 119 15.78 0.1 40
05:16:2016:02:19:29 4.6 936 15.68 5.1 316
05:16:2016:02:20:44 6.4 1661 15.86 12.7 478
05:16:2016:02:21:59 6.4 1551 15.62 20.7 427
05:16:2016:02:23:14 5.4 1164 15.97 27.6 310
05:16:2016:02:24:29 5.1 920 15.42 34.2 224
05:16:2016:02:25:44 5.0 974 16.12 40.5 207
05:16:2016:02:26:59 5.1 987 15.81 46.9 213
05:16:2016:02:28:14 5.8 1213 15.86 53.5 261
05:16:2016:02:29:29 5.8 1208 15.85 60.7 239
05:16:2016:02:30:44 5.8 1212 15.85 67.8 239
05:16:2016:02:31:59 6.2 1421 16.04 75.2 298
05:16:2016:02:33:14 6.2 1430 15.94 83.0 303
05:16:2016:02:34:29 6.2 1378 15.73 90.7 273
05:16:2016:02:35:44 6.9 1701 15.87 98.9 340
05:16:2016:02:36:59 6.6 1549 15.77 107.2 312
05:16:2016:02:38:14 6.3 1375 15.68 115.4 281
05:16:2016:02:39:29 6.5 1565 15.85 123.4 323
05:16:2016:02:40:44 6.5 1554 16.06 131.6 306
05:16:2016:02:41:59 6.5 1520 15.91 139.7 307
05:16:2016:02:43:14 6.5 1411 15.88 147.9 332
05:16:2016:02:44:21 End Cement Slurry
05:16:2016:02:44:21 0.0 21 15.59 153.0 32
05:16:2016:02:44:23 Reset Total,Vol= 152.97 bbl
05:16:2016:02:44:23 0.0 21 15.58 153.0 33
05:16:2016:02:44:29 0.0 21 15.57 0.0 31
05:16:2016:02:45:44 0.0 20 9.39 0.0 25
05:16:2016:02:46:59 0.0 21 8.81 0.0 26
05:16:2016:02:47:57 Drop Plug
05:16:2016:02:47:57 0.0 21 8.70 0.0 28
05:16:2016:02:48:14 0.0 17 8.68 0.0 29
05:16:2016:02:49:29 0.0 17 8.63 0.0 29
05:16:2016:02:50:44 0.0 19 8.62 0.0 25
05:16:2016:02:51:30 Kick out plug
05:16:2016:02:51:30 4.1 270 8.56 2.0 51
05:16:2016:02:51:59 4.5 331 8.47 4.1 65
05:16:2016:02:53:14 4.5 318 8.37 9.7 66
05:16:2016:02:53:36 End water behind
05:16:2016:02:53:36 0.0 17 8.35 10.2 17
05:16:2016:02:53:55 Reset Total,Vol= 10.16 bbl
05:16:2016:02:53:55 0.0 13 8.38 10.2 14
05:16:2016:02:54:29 0.0 8 8.39 0.0 15
05:16:2016:02:54:32 Start mud displacement
05:16:2016:02:54:32 0.0 7 8.39 0.0 15
05:16:2016:02:55:44 2.1 76 8.40 0.4 24
05:16:2016:02:56:59 6.2 631 8.35 7.6 124
05:16:2016:02:58:14 6.2 621 8.35 15.3 132
05:16:2016:02:59:29 6.2 591 8.35 23.0 136
Page 2 of 5
Well: CD5-02A • • Job Date:05-16-2016
Time Flow Rate CMT TREAT PRES CMT DENS CMT STG VOL WHP
mm:dd:yyyy:hh:mm:ss bbl/min psi lb/gal bbl psi
05:16:2016:03:00:44 6.2 622 8.34 30.8 151
05:16:2016:03:01:59 6.2 637 8.34 38.5 145
05:16:2016:03:03:14 6.2 644 8.33 46.2 133
05:16:2016:03:04:29 6.2 616 8.33 53.9 135
05:16:2016:03:05:44 6.2 630 8.32 61.7 146
05:16:2016:03:06:59 6.2 635 8.32 69.4 149
05:16:2016:03:08:14 6.2 607 8.32 77.1 128
05:16:2016:03:09:29 6.2 610 8.31 84.9 134
05:16:2016:03:10:44 6.2 592 8.31 92.6 153
05:16:2016:03:11:59 6.2 614 8.31 100.3 136
05:16:2016:03:13:14 6.2 588 8.31 108.0 142
05:16:2016:03:14:29 6.2 581 8.31 115.8 148
05:16:2016:03:15:44 6.2 632 8.30 123.5 143
05:16:2016:03:16:59 6.2 615 8.31 131.2 130
05:16:2016:03:18:14 6.2 621 8.28 138.9 137
05:16:2016:03:19:29 6.2 580 8.30 146.7 141
05:16:2016:03:20:44 6.2 628 8.30 154.4 147
05:16:2016:03:21:59 6.2 597 8.30 162.1 130
05:16:2016:03:23:14 6.2 587 8.30 169.8 116
05:16:2016:03:24:29 6.2 597 8.30 177.6 141
05:16:2016:03:25:44 6.2 566 8.30 185.3 135
05:16:2016:03:26:59 6.2 591 8.30 193.0 122
05:16:2016:03:28:14 6.2 600 8.30 200.7 131
05:16:2016:03:29:29 6.2 590 8.30 208.5 148
05:16:2016:03:30:44 6.2 567 8.30 216.2 142
05:16:2016:03:31:59 6.2 608 8.30 223.9 137
05:16:2016:03:33:14 6.2 580 8.30 231.7 132
05:16:2016:03:34:29 6.2 572 8.29 239.4 126
05:16:2016:03:35:44 6.2 582 8.30 247.1 159
05:16:2016:03:36:59 6.2 573 8.30 254.8 165
05:16:2016:03:38:14 6.2 635 8.29 262.6 185
05:16:2016:03:39:29 6.2 580 8.30 270.3 178
05:16:2016:03:40:44 6.2 614 8.30 278.0 182
05:16:2016:03:41:59 6.2 607 8.30 285.7 168
05:16:2016:03:43:14 6.2 623 8.30 293.5 176
05:16:2016:03:44:29 6.2 655 8.30 301.2 170
05:16:2016:03:45:44 3.4 168 8.30 307.1 48
05:16:2016:03:46:59 3.4 167 8.30 311.4 51
05:16:2016:03:48:14 3.4 189 8.29 315.6 53
05:16:2016:03:49:29 3.4 187 8.30 319.9 55
05:16:2016:03:50:44 4.2 260 8.30 324.2 71
05:16:2016:03:51:59 6.0 585 8.30 331.5 134
05:16:2016:03:53:14 5.9 576 8.30 339.0 147
05:16:2016:03:54:29 6.0 627 8.30 346.5 173
05:16:2016:03:55:44 6.0 576 8.30 353.9 194
05:16:2016:03:56:59 5.9 592 8.30 361.4 219
05:16:2016:03:58:14 5.9 570 8.30 368.8 197
05:16:2016:03:59:29 5.9 598 8.30 376.3 242
05:16:2016:04:00:44 5.9 651 8.30 383.7 233
05:16:2016:04:01:59 6.0 623 8.30 391.2 247
05:16:2016:04:03:14 6.0 679 8.30 398.6 271
05:16:2016:04:04:29 6.0 664 8.30 406.1 279
05:16:2016:04:05:44 5.9 700 8.30 413.5 320
05:16:2016:04:06:59 5.9 763 8.31 421.0 316
05:16:2016:04:08:14 5.9 765 8.30 428.4 342
05:16:2016:04:09:29 5.9 824 8.30 435.8 379
05:16:2016:04:10:44 5.8 1259 8.31 443.2 875
05:16:2016:04:11:59 5.9 1020 8.30 450.6 624
05:16:2016:04:13:14 5.9 958 8.30 457.9 585
05:16:2016:04:14:29 5.9 938 8.30 465.3 561
05:16:2016:04:15:44 5.9 977 8.30 472.7 637
05:16:2016:04:16:59 5.9 1035 8.31 480.1 652
05:16:2016:04:18:14 6.1 1116 8.30 487.5 692
05:16:2016:04:19:29 6.1 1177 8.30 495.1 715
05:16:2016:04:20:44 6.0 1123 8.31 502.6 707
05:16:2016:04:21:59 6.0 1152 8.30 510.1 728
05:16:2016:04:23:14 6.0 1194 8.31 517.7 820
Pape 3of5
Well: CD5-02A • . Job Date: 05-16-2016
Time Flow Rate CMT TREAT PRES CMT DENS CMT STG VOL WHP
mm:dd:yyyy:hh:mm:ss 1 bbl/min psi 1 lb/gal bbl psi
05:16:2016:04:24:29 6.0 1217 8.30 525.2 865
05:16:2016:04:25:44 6.0 1236 8.30 532.7 816
05:16:2016:04:26:59 6.0 1279 8.31 540.2 848
05:16:2016:04:28:14 6.0 1309 8.30 547.7 943
05:16:2016:04:29:29 6.0 1346 8.30 555.3 941
05:16:2016:04:30:44 6.0 1388 8.30 562.8 877
05:16:2016:04:31:59 6.0 1411 8.30 570.3 918
05:16:2016:04:33:14 6.0 1406 8.30 577.8 923
05:16:2016:04:34:29 6.0 1423 8.31 585.3 1012
05:16:2016:04:35:44 6.0 1427 8.31 592.8 1023
05:16:2016:04:36:59 6.0 1448 8.30 600.3 954
05:16:2016:04:38:14 6.0 1469 8.31 607.8 945
05:16:2016:04:39:29 6.0 1389 8.30 615.3 1066
05:16:2016:04:40:44 6.0 1417 8.31 622.8 1030
05:16:2016:04:41:59 6.0 1439 8.31 630.3 991
05:16:2016:04:43:14 6.0 1455 8.31 637.7 995
05:16:2016:04:44:29 6.0 1438 8.31 645.2 1052
05:16:2016:04:45:44 6.0 1419 8.31 652.7 1054
05:16:2016:04:46:59 6.0 1542 8.31 660.2 1019
05:16:2016:04:48:14 6.0 1556 8.31 667.7 1079
05:16:2016:04:49:29 6.0 1534 8.31 675.2 1107
05:16:2016:04:50:44 3.4 1016 8.31 681.8 857
05:16:2016:04:51:59 3.1 945 8.31 685.7 870
05:16:2016:04:53:14 3.1 932 8.31 689.5 848
05:16:2016:04:54:29 3.1 979 8.31 693.4 814
05:16:2016:04:55:44 3.0 887 8.31 697.2 888
05:16:2016:04:56:57 664 bbl away
05:16:2016:04:56:57 0.0 667 8.31 700.1 671
05:16:2016:04:56:59 0.0 655 8.31 700.1 663
05:16:2016:04:57:08 Shut down
05:16:2016:04:57:08 0.0 629 8.31 700.1 637
05:16:2016:04:58:14 0.0 580 8.31 700.1 587
05:16:2016:04:59:29 0.0 748 8.31 702.4 756
05:16:2016:04:59:38 666 bbl away
05:16:2016:04:59:38 0.0 688 8.31 702.4 695
05:16:2016:04:59:43 Shutdown-ISIP
05:16:2016:04:59:43 0.0 665 8.31 702.4 674
05:16:2016:05:00:44 0.0 584 8.31 702.4 595
05:16:2016:05:01:59 0.0 572 8.31 702.4 580
05:16:2016:05:03:14 0.0 569 4.78 702.4 576
05:16:2016:05:04:29 0.0 570 0.00 702.4 579
05:16:2016:05:05:44 0.0 572 -0.00 702.4 581
05:16:2016:05:06:56 Bleed Off Pressure
05:16:2016:05:06:56 0.0 576 0.00 702.4 583
05:16:2016:05:06:59 0.0 576 0.00 702.4 585
05:16:2016:05:07:08 Check floats
05:16:2016:05:07:08 0.0 576 0.00 702.4 583
05:16:2016:05:08:14 0.0 55 0.00 702.4 232
05:16:2016:05:09:29 0.0 21 0.00 702.4 25
05:16:2016:05:10:06 Floats hold
05:16:2016:05:10:06 0.0 -5 0.00 702.4 29
05:16:2016:05:10:10 Reset Total,Vol=702.36 bbl
05:16:2016:05:10:10 0.0 -6 0.00 702.4 27
05:16:2016:05:10:26 WOC
05:16:2016:05:10:26 0.0 -5 0.00 0.0 31
05:16:2016:05:10:44 0.0 -6 0.00 0.0 29
05:16:2016:05:11:59 0.0 -8 0.00 0.0 33
05:16:2016:05:13:14 0.0 -1 0.01 0.0 35
05:16:2016:05:14:29 0.0 61 -0.00 0.0 32
05:16:2016:05:15:44 0.0 -2 0.00 0.0 30
05:16:2016:05:16:59 0.0 -7 0.01 0.0 29
05:16:2016:05:18:14 0.0 -10 -0.00 0.0 32
05:16:2016:05:19:29 0.0 -3 0.01 0.0 8
05:16:2016:05:20:44 0.0 17 0.00 0.0 9
05:16:2016:05:21:59 0.0 -7 0.00 0.0 7
05:16:2016:05:23:14 0.0 -8 8.30 0.0 10
05:16:2016:05:24:29 0.0 -10 8.30 0.0 6
Pacie 4 of 5
Well: CD5-02A • • Job Date: 05-16-2016
Time Flow Rate 1 CMT TREAT PRES CMT DENS I CMT STG VOL WHP
mm:dd:yyyy:hh:mm:ss bbl/min psi lb/gal bbl psi
05:16:2016:05:25:44 0.0 17 0.00 0.0 7
05:16:2016:05:26:59 0.0 10 0.00 0.0 28
05:16:2016:05:28:14 0.0 7 0.00 0.0 10
05:16:2016:05:29:29 0.0 113 0.00 0.0 11
05:16:2016:05:30:44 0.0 -0 0.00 0.0 12
05:16:2016:05:31:59 0.0 -3 0.00 0.0 11
05:16:2016:05:33:14 0.0 -5 0.01 0.0 12
05:16:2016:05:34:29 0.0 -2 0.00 0.0 11
05:16:2016:05:35:44 0.0 -2 0.00 0.0 8
05:16:2016:05:35:53 Stopped Acquisition
05:16:2016:05:35:53 0.0 -4 0.00 0.0 11
05:16:2016:05:36:05 Started Acquisition
05:16:2016:05:36:05 0.0 -3 0.00 0.0 10
Paae 5 of 5
Schlumberger • Cementing )oteport CemCATv1.5
Well CD5-02A Client Conoco Phillips Alpine
Field Alpine SIR No.
Engineer Todd Jaggers Job Type 7.625 Intermediate 2 stage
Country United States Job Date 05-16-2016
Time Pressure Rate Density WHP Messages
01:09:29
01:29:00
01:49:00
P]SM
— Line up to CMT Unit
Flood surface lines
Shut in for PT
PT lines
02:09:00 Bleed Off Pressure
Reset Total,Vol=1.99 bbl
Batch tub of Spacer
StartSpacer
Reset Total,Vol=47.32 bbl
End Spacer
Mix tub of cement
02:29:00 Start Cement Slurry
i
End Cement Slurry
02:49:00 ( Reset Total,Vol=152.97 bbl
!!!i Drop Plug
l ~ l Kick out plug
End water behind
Reset Total,Vol=10.16 bbl
Start mud displacement
03:09:00
03:29:00
03:49:00
04:09:00
04:29:00
04:49:00
664 bbl away
Shut down
666 bbl away
Shutdown-ISIP
05:09:00 Bleed Off Pressure
Check floats
Floats hold
Reset Total,Vol=702.36 bbl
WOC
t
05:29:00
05:36:07 Stopped Acquisition
Started Acquisition
hh:mm:ss 0.00 1000 2000 3000 4000 5000 0.00 2.0 4.0 6.0 0.0 10.0 5.0 A0 13.0 17.0 21.0 25.0 0.00 1000 2000 3000 4000 5000
oynoo0111os36:07 PSI B/M LB/G PSI
RE4IVED
• 21 60 68
JUN 102U1'6 27292
chiunuiberger Transmittal#: 10JUN16-SPO2
Drilling & Measurements
-ATA LOGGED
MWD/LWD Log Product Delivery /%3/2014.
K.BENGEF
Customer: ConocoPhillips Alaska Dispatched To: AOGCC: Makana Bender
Well No: CD5-02A Date Dispatched: 10-Jun-16
Job#: 15AKA0032 Dispatched By: Stephanie Pacillo
Well/
Product Hardcopy Digital Copy E-Delivery Date
Color Log Prints: 4 Contents on CD N/A
Scope Resistivity 2" MD x x
Scope Resistivity 2"TVD x x
Scope Resistivity 5'MD x x
Scope Resistivity 5"TVD x x
LAS Digital Data N/A Contents on CD
x
Directional Data 1 Contents on CD
Nad27 x x
As-Built Survey 1 Contents on CD
Nad83 x x
EOW CD 1 Contents on CD
Data: DLIS/ASCII x
Graphics:pdf/tiff x
Survey:pdf/txt x
Please sign and email a copy to: Please sign and email a copy to:
Tom.Osterkamp(aconocophillips.com AlaskaPTSPrintCenterslb.com
Attn: Tom Osterkamp Attn: Stephanie Pacillo
907-263-4795 ✓��� '../✓�%�c
Received By:
. • 21f � 68
eiVe 27 292
.� 2p1�i
FINAL
NADConversion
Western North Slope
CD5 Alpine West Pad
CD5-02A
CD5-02A
NAD 27
Definitive Survey Report
31 May, 2016
• •
SLB
Definitive Survey Report
Company: NADConversion Local Co-ordinate Reference: Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Project Western North Slope,North Slope Alaska,United States
Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
Well CD5-02
Well Position +N/-S 0.00 usft Northing: 5,965,910.31 usft Latitude: 70°18'50.309 N
+E/-W 0.00 usft Easting: 349,520.15 usft Longitude: 151°13'10.621 W
Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 34.10 usft
Wellbore CD5-02A
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
(°) (°) (nT)
BGGM2015 4/1/2016 17.70 80.83 57,468
Design CD5-02A
Audit Notes:
Version: 1.0 Phase: ACTUAL Tie On Depth: 2,360 57
Vertical Section: Depth From(TVD) +N/-S +E/-W Direction
(usft) (usft) (usft) (0)
36.81 0.00 0.00 333.00
Survey Program Date
From To
(usft) (usft) Survey(Wellbore) Tool Name Description Survey Date
100.00 600.00 CD5-02 Svy1-SLB_NSG+MSHOT(CD5 GYD-GC-MS Gyrodata gyrocompassing m/s 3/28/2016 8:50:
662.12 2,360.57 CD5-02 Svy2-SLB_MWD+GMAG(CD5 MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 3/28/2016 9:01:
2,452.74 2,639.97 CD5-02A Svy1-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/6/2016 11:29:0
2,734.99 2,734.99 CD5-02A Svy2-SLB_INC-FILLER(CD5 INC+TREND Inclinometer+known azi trend 5/6/2016 11:29:0
2,828.57 14,638.89 CD5-02A Svy3-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/6/2016 11:29:0
14,705.18 14,705.18 CD5-02A Svy4-SLB_INC+FILLER(CD5 INC+TREND Inclinometer+known azi trend 5/19/2016 10:50
14,800.56 21,948.62 CD5-02A Svy5-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/19/2016 10:52
Survey
Map Map Vertical
MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section
(usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name
36.81 0.00 0.00 36.81 -34.10 0.00 0.00 5,965,910.31 349,520.15 0.00 0.00 UNDEFINED
100.00 0.25 21.97 100.00 29.09 0.13 0.05 5,965,910.44 349,520.20 0.40 0.09 GY0-GC-MS(1)
200.00 0.45 336.14 200.00 129.09 0.69 -0.03 5,965,911.00 349,520.14 0.33 0.63 GYD-GC-MS(1)
300.00 0.49 331.59 299.99 229.08 1.42 -0.39 5,965,911.74 349,519.79 0.05 1.45 GYD-GC-MS(1)
400.00 1.00 12.41 399.99 329.08 2.65 -0.40 5,965,912.97 349,519.80 0.71 2.55 GYD-GC-MS(1)
500.00 1.76 29.10 499.96 429.05 4.85 0.53 5,965,915.15 349,520.77 0.85 4.08 GYD-GC-MS(1)
600.00 2.46 21.57 599.89 528.98 8.18 2.07 5,965,918.45 349,522.38 0.75 6.35 GYD-GC-MS(1)
662.12 2.50 4.37 661.95 591.04 10.78 2.66 5,965,921.03 349,523.02 1.20 8.39 MWD+1FR-AK-CAZ-SC(2)
754.58 4.34 355.28 754.24 683.33 16.27 2.53 5,965,926.53 349,523.00 2.07 13.35 MWD+1FR-AK-CAZ-SC(2)
5/31/2016 3:41:28PM Page 2 COMPASS 5000.1 Build 74
• •
SLB
Definitive Survey Report
Company: NADConversion Local Co-ordinate Reference: Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Survey
Map Map Vertical
MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section
(usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) (0/100') (ft) Survey Tool Name
848.35 7.24 354.20 847.53 776.62 25.69 1.64 5,965,935.96 349,522.30 3.09 22.15 MWD+IFR-AK-CAZ-SC(2)
942.30 9.87 357.07 940.42 869.51 39.62 0.63 5,965,949.91 349,521.57 2.84 35.02 MWD+IFR-AK-CAZ-SC(2)
1,036.06 11.67 359.72 1,032.53 961.62 57.13 0.17 5,965,967.43 349,521.46 1.99 50.83 MWD+IFR-AK-CAZ-SC(2)
1,131.13 13.07 1.08 1,125.39 1,054.48 77.50 0.32 5,965,987.78 349,522.02 1.50 68.90 MWD+IFR-AK-CAZ-SC(2)
1,225.92 14.67 4.82 1,217.41 1,146.50 100.18 1.54 5,966,010.43 349,523.69 1.93 88.56 MWD+IFR-AK-CAZ-SC(2)
1,318.58 19.54 12.24 1,305.96 1,235.05 127.03 5.81 5,966,037.19 349,528.50 5.75 110.55 MWD+IFR-AK-CAZ-SC(2)
1,415.08 22.60 15.63 1,396.00 1,325.09 160.67 14.23 5,966,070.65 349,537.59 3.41 136.70 MWD+IFR-AK-CAZ-SC(2)
1,510.04 24.01 16.49 1,483.21 1,412.30 196.76 24.63 5,966,106.53 349,548.71 1.53 164.14 MWD+IFR-AK-CAZ-SC(2)
1,604.48 26.76 17.67 1,568.52 1,497.61 235.45 36.54 5,966,144.97 349,561.39 2.96 193.20 MWD+IFR-AK-CAZ-SC(2)
1,695.70 30.55 17.53 1,648.56 1,577.65 277.14 49.76 5,966,186.38 349,575.45 4.16 224.35 MWD+IFR-AK-CAZ-SC(2)
1,793.42 33.69 14.20 1,731.32 1,660.41 327.12 63.89 5,966,236.06 349,590.58 3.69 262.45 MWD+IFR-AK-CAZ-SC(2)
1,888.31 36.08 12.92 1,809.15 1,738.24 379.87 76.60 5,966,288.54 349,604.34 2.63 303.69 MWD+IFR-AK-CAZ-SC(2)
1,982.46 39.70 11.99 1,883.44 1,812.53 436.33 89.05 5,966,344.73 349,617.92 3.89 348.34 MWD+IFR-AK-CAZ-SC(2)
2,076.91 42.58 14.69 1,954.57 1,883.66 496.76 103.42 5,966,404.86 3.49,633.50 3.58 395.66 MWD+IFR-AK-CAZ-SC(2)
2,170.36 44.87 18.26 2,022.11 1,951.20 558.66 121.77 5,966,466.38 349,653.08 3.60 442.49 MWD+IFR-AK-CAZ-SC(2)
2,265.64 47.38 23.17 2,088.16 2,017.25 622.84 146.11 5,966,530.05 349,678.70 4.55 488.62 MWD+IFR-AK-CAZ-SC(2)
2,360.57 51.38 24.84 2,149.95 2,079.04 688.63 175.44 5,966,595.24 349,709.34 4.42 533.93 MWD+IFR-AK-CAZ-SC(2)
2,423.99 52.03 23.98 2,189.26 2,118.35 733.96 196.01 5,966,640.14 349,730.81 1.48 564.98
10-3/4"x 13-1/2"
2,452.74 52.33 23.59 2,206.88 2,135.97 754.74 205.17 5,966,660.73 349,740.39 1.48 579.34 WD+IFR-AK-CAZ-SC(3)
2,545.71 56.39 24.65 2,261.05 2,190.14 823.68 236.05 5,966,729.03 349,772.64 4.46 626.74 MWD+IFR-AK-CAZ-SC(3)
2,639.97 53.99 27.03 2,314.86 2,243.95 893.33 269.76 5,966,797.99 349,807.73 3.28 673.49 MWD+IFR-AK-CAZ-SC(3)
2,734.99 52.91 32.94 2,371.48 2,300.57 959.41 307.85 5,966,863.29 349,847.14 5.12 715.08 INC+TREND(4)
2,828.57 53.50 39.31 2,427.56 2,356.65 1,019.87 352.01 5,966,922.85 349,892.50 5.49 748.91 MWD+IFR-AK-CAZ-SC(5)
2,922.65 54.87 38.81 2,482.61 2,411.70 1,079.11 400.08 5,966,981.11 349,941.74 1.52 779.87 MWD+IFR-AK-CAZ-SC(5)
3,016.89 57.10 35.12 2,535.34 2,464.43 1,141.53 447.01 5,967,042.57 349,989.91 4.02 814.17 MWD+IFR-AK-CAZ-SC(5)
3,112.00 59.29 33.00 2,585.47 2,514.56 1,208.49 492.25 5,967,108.60 350,036.48 2.98 853.29 MWD+IFR-AK-CAZ-SC(5)
3,206.55 61.41 30.06 2,632.25 2,561.34 1,278.52 535.20 5,967,177.76 350,080.82 3.51 896.20 MWD+IFR-AK-CAZ-SC(5)
3,301.30 63.85 26.69 2,675.81 2,604.90 1,352.55 575.15 5,967,250.96 350,122.24 4.07 944.02 MWD+IFR-AK-CAZ-SC(5)
3,394.10 65.74 24.18 2,715.34 2,644.43 1,428.37 611.19 5,967,326.04 350,159.80 3.18 995.21 MWD+IFR-AK-CAZ-SC(5)
3,488.44 66.22 21.27 2,753.75 2,682.84 1,507.84 644.47 5,967,404.82 350,194.66 2.86 1,050.91 MWD+IFR-AK-CAZ-SC(5)
3,582.42 66.34 17.36 2,791.56 2,720.65 1,589.02 672.92 5,967,485.41 350,224.73 3.81 1,110.32 MWD+IFR-AK-CAZ-SC(5)
3,677.29 66.31 13.39 2,829.67 2,758.76 1,672.77 695.95 5,967,568.68 350,249.43 3.83 1,174.49 MWD+IFR-AK-CAZ-SC(5)
3,772.01 66.54 13.23 2,867.55 2,796.64 1,757.25 715.94 5,967,652.74 350,271.11 0.29 1,240.70 MWD+IFR-AK-CAZ-SC(5)
3,865.20 66.06 13.07 2,905.01 2,834.10 1,840.35 735.35 5,967,735.42 350,292.18 0.54 1,305.92 MWD+IFR-AK-CAZ-SC(5)
3,959.85 66.15 13.67 2,943.35 2,872.44 1,924.54 755.36 5,967,819.18 350,313.87 0.59 1,371.85 MWD+IFR-AK-CAZ-SC(5)
4,054.08 65.53 14.33 2,981.92 2,911.01 2,007.96 776.16 5,967,902.17 350,336.34 0.92 1,436.74 MWD+IFR-AK-CAZ-SC(5)
4,146.86 65.66 14.61 3,020.25 2,949.34 2,089.77 797.27 5,967,983.53 350,359.08 0.31 1,500.04 MWD+IFR-AK-CAZ-SC(5)
4,241.18 65.57 15.12 3,059.19 2,988.28 2,172.80 819.31 5,968,066.10 350,382.78 0.50 1,564.02 MWD+IFR-AK-CAZ-SC(5)
4,334.98 65.54 14.77 3,098.01 3,027.10 2,255.30 841.33 5,968,148.13 350,406.45 0.34 1,627.53 MWD+IFR-AK-CAZ-SC(5)
5/31/2016 3:41:28PM Page 3 COMPASS 5000.1 Build 74
• •
SLB
Definitive Survey Report
Company: NADConversion Local Co-ordinate Reference: Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
i
Survey
Map Map Vertical
MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section
(usft) (°) (0) (usft) (usft) (usft) (usft) (ft) (ft) (0/100') (ft) Survey Tool Name
4,428.97 65.53 15.61 3,136.94 3,066.03 2,337.86 863.75 5,968,230.22 350,430.51 0.81 1,690.92 MWD+IFR-AK-CAZ-SC(5)
4,524.52 65.58 16.41 3,176.48 3,105.57 2,421.47 887.74 5,968,313.33 350,456.17 0.76 1,754.52 MWD+IFR-AK-CAZ-SC(5)
4,616.05 65.12 16.77 3,214.65 3,143.74 2,501.20 911.49 5,968,392.56 350,481.51 0.62 1,814.78 MWD+IFR-AK-CAZ-SC(5)
4,709.66 64.92 17.04 3,254.18 3,183.27 2,582.39 936.17 5,968,473.23 350,507.81 0.34 1,875.91 MWD+IFR-AK-CAZ-SC(5)
4,804.04 65.06 17.52 3,294.09 3,223.18 2,664.06 961.57 5,968,554.37 350,534.84 0.48 1,937.15 MWD+IFR-AK-CAZ-SC(5)
4,898.96 65.00 18.21 3,334.16 3,263.25 2,745.95 987.97 5,968,635.71 350,562.87 0.66 1,998.13 MWD+IFR-AK-CAZ-SC(5)
4,991.95 64.90 18.02 3,373.53 3,302.62 2,826.02 1,014.16 5,968,715.23 350,590.66 0.21 2,057.58 MWD+IFR-AK-CAZ-SC(5)
5,087.11 64.85 19.09 3,413.93 3,343.02 2,907.70 1,041.58 5,968,796.34 350,619.71 1.02 2,117.91 MWD+IFR-AK-CAZ-SC(5)
5,181.94 64.90 18.91 3,454.20 3,383.29 2,988.88 1,069.53 5,968,876.93 350,649.28 0.18 2,177.55 MWD+IFR-AK-CAZ-SC(5)
5,275.90 65.00 19.29 3,493.98 3,423.07 3,069.31 1,097.38 5,968,956.79 350,678.74 0.38 2,236.58 MWD+IFR-AK-CAZ-SC(5)
5,369.98 65.04 19.59 3,533.71 3,462.80 3,149.73 1,125.77 5,969,036.62 350,708.72 0.29 2,295.34 MWD+IFR-AK-CAZ-SC(5)
5,464.84 64.87 19.88 3,573.87 3,502.96 3,230.62 1,154.79 5,969,116.91 350,739.36 0.33 2,354.25 MWD+IFR-AK-CAZ-SC(5)
5,557.91 64.93 20.29 3,613.35 3,542.44 3,309.78 1,183.73 5,969,195.46 350,769.88 0.40 2,411.63 MWD+IFR-AK-CAZ-SC(5)
5,653.33 64.77 20.62 3,653.90 3,582.99 3,390.71 1,213.91 5,969,275.76 350,801.68 0.36 2,470.04 MWD+IFR-AK-CAZ-SC(5)
5,747.51 64.93 20.17 3,693.93 3,623.02 3,470.61 1,243.62 5,969,355.05 350,832.98 0.46 2,527.75 MWD+IFR-AK-CAZ-SC(5)
5,841.85 64.94 19.78 3,733.90 3,662.99 3,550.93 1,272.82 5,969,434.76 350,863.77 0.37 2,586.05 MWD+IFR-AK-CAZ-SC(5)
5,935.50 64.96 19.70 3,773.55 3,702.64 3,630.78 1,301.47 5,969,514.02 350,894.02 0.08 2,644.20 MWD+IFR-AK-CAZ-SC(5)
6,030.19 65.03 19.99 3,813.57 3,742.66 3,711.50 1,330.60 5,969,594.13 350,924.76 0.29 2,702.89 MWD+IFR-AK-CAZ-SC(5)
6,124.34 65.07 19.90 3,853.29 3,782.38 3,791.75 1,359.72 5,969,673.77 350,955.48 0.10 2,761.17 MWD+IFR-AK-CAZ-SC(5)
6,218.84 65.09 18.95 3,893.11 3,822.20 3,872.57 1,388.22 5,969,754.00 350,985.60 0.91 2,820.24 MWD+IFR-AK-CAZ-SC(5)
6,312.39 64.99 18.59 3,932.58 3,861.67 3,952.87 1,415.51 5,969,833.73 351,014.49 0.36 2,879.40 MWD+IFR-AK-CAZ-SC(5)
6,406.81 65.07 18.16 3,972.44 3,901.53 4,034.10 1,442.50 5,969,914.40 351,043.09 0.42 2,939.53 MWD+IFR-AK-CAZ-SC(5)
6,500.93 64.52 17.35 4,012.52 3,941.61 4,115.20 1,468.47 5,969,994.95 351,070.68 0.97 3,000.00 MWD+IFR-AK-CAZ-SC(5)
6,595.39 64.53 17.24 4,053.15 3,982.24 4,196.62 1,493.82 5,970,075.84 351,097.65 0.11 3,061.04 MWD+IFR-AK-CAZ-SC(5)
6,690.01 64.56 16.53 4,093.82 4,022.91 4,278.37 1,518.63 5,970,157.07 351,124.10 0.68 3,122.61 MWD+IFR-AK-CAZ-SC(5)
6,784.37 64.60 15.72 4,134.33 4,063.42 4,360.24 1,542.30 5,970,238.45 351,149.40 0.78 3,184.82 MWD+IFR-AK-CAZ-SC(5)
6,879.10 64.56 15.49 4,174.99 4,104.08 4,442.65 1,565.32 5,970,320.37 351,174.06 0.22 3,247.79 MWD+IFR-AK-CAZ-SC(5)
6,973.56 64.56 15.43 4,215.57 4,144.66 4,524.86 1,588.06 5,970,402.11 351,198.44 0.06 3,310.72 MWD+IFR-AK-CAZ-SC(5)
7,067.65 64.52 17.02 4,256.02 4,185.11 4,606.43 1,611.79 5,970,483.17 351,223.81 1.53 3,372.62 MWD+IFR-AK-CAZ-SC(5)
7,161.80 64.56 15.59 4,296.49 4,225.58 4,688.01 1,635.66 5,970,564.26 351,249.30 1.37 3,434.48 MWD+IFR-AK-CAZ-SC(5)
7,254.97 64.37 15.58 4,336.65 4,265.74 4,768.99 1,658.24 5,970,644.76 351,273.50 0.20 3,496.38 MWD+IFR-AK-CAZ-SC(5)
7,349.81 64.39 16.28 4,377.66 4,306.75 4,851.22 1,681.71 5,970,726.50 351,298.62 0.67 3,558.99 MWD+IFR-AK-CAZ-SC(5)
7,443.90 64.50 17.86 4,418.25 4,347.34 4,932.36 1,706.63 5,970,807.12 351,325.15 1.52 3,619.98 MWD+IFR-AK-CAZ-SC(5)
7,537.89 64.55 19.53 4,458.68 4,387.77 5,012.74 1,733.83 5,970,886.92 351,353.95 1.60 3,679.24 MWD+IFR-AK-CAZ-SC(5)
7,632.01 64.66 20.81 4,499.05 4,428.14 5,092.54 1,763.14 5,970,966.12 351,384.86 1.23 3,737.04 MWD+IFR-AK-CAZ-SC(5)
7,726.45 64.56 20.54 4,539.54 4,468.63 5,172.37 1,793.27 5,971,045.32 351,416.57 0.28 3,794.49 MWD+IFR-AK-CAZ-SC(5)
7,821.71 64.58 20.86 4,580.45 4,509.54 5,252.84 1,823.68 5,971,125.16 351,448.59 0.30 3,852.39 MWD+IFR-AK-CAZ-SC(5)
7,915.40 64.62 20.51 4,620.63 4,549.72 5,332.02 1,853.57 5,971,203.72 351,480.06 0.34 3,909.36 MWD+IFR-AK-CAZ-SC(5)
8,011.22 64.65 20.41 4,661.68 4,590.77 5,413.14 1,883.84 5,971,284.21 351,511.94 0.10 3,967.90 MWD+IFR-AK-CAZ-SC(5)
8,104.74 64.63 20.45 4,701.74 4,630.83 5,492.33 1,913.33 5,971,362.79 351,543.02 0.04 4,025.07 MWD+IFR-AK-CAZ-SC(5)
5/31/2016 3:41:28PM Page 4 COMPASS 5000.1 Build 74
• •
SLB
Definitive Survey Report
Company: NADConversion Local Co-ordinate Reference: Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Survey
Map Map Vertical
MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section
(usft) (') (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/1001 (ft) Survey Tool Name
8,197.85 64.56 20.57 4,741.68 4,670.77 5,571.11 1,942.80 5,971,440.95 351,574.06 0.14 4,081.88 MWD+IFR-AK-CAZ-SC(5)
8,292.11 64.54 20.71 4,782.19 4,711.28 5,650.76 1,972.80 5,971,519.98 351,605.65 0.14 4,139.23 MWD+IFR-AK-CAZ-SC(5)
8,386.20 64.47 21.63 4,822.69 4,751.78 5,729.95 2,003.47 5,971,598.54 351,637.90 0.89 4,195.87 MWD+IFR-AK-CAZ-SC(5)
8,480.45 64.34 20.61 4,863.40 4,792.49 5,809.24 2,034.10 5,971,677.19 351,670.11 0.99 4,252.61 MWD+IFR-AK-CAZ-SC(5)
8,575.29 64.56 20.11 4,904.31 4,833.40 5,889.46 2,063.87 5,971,756.79 351,701.48 0.53 4,310.57 MWD+IFR-AK-CAZ-SC(5)
8,669.85 64.50 19.10 4,944.97 4,874.06 5,969.88 2,092.52 5,971,836.62 351,731.72 0.97 4,369.22 MWD+IFR-AK-CAZ-SC(5)
8,764.27 64.39 18.30 4,985.71 4,914.80 6,050.57 2,119.83 5,971,916.73 351,760.64 0.77 4,428.71 MWD+IFR-AK-CAZ-SC(5)
8,856.36 64.91 17.90 5,025.13 4,954.22 6,129.67 2,145.68 5,971,995.30 351,788.08 0.69 4,487.46 MWD+IFR-AK-CAZ-SC(5)
8,951.27 65.00 19.71 5,065.31 4,994.40 6,211.06 2,173.40 5,972,076.11 351,817.42 1.73 4,547.40 MWD+IFR-AK-CAZ-SC(5)
9,046.24 65.13 19.44 5,105.35 5,034.44 6,292.20 2,202.25 5,972,156.65 351,847.89 0.29 4,606.59 MWD+IFR-AK-CAZ-SC(5)
9,140.37 64.99 20.25 5,145.04 5,074.13 6,372.49 2,231.22 5,972,236.33 351,878.46 0.79 4,664.97 MWD+IFR-AK-CAZ-SC(5)
9,234.78 65.09 20.30 5,184.88 5,113.97 6,452.78 2,260.88 5,972,316.00 351,909.72 0.12 4,723.05 MWD+IFR-AK-CAZ-SC(5)
9,328.39 65.00 20.39 5,224.38 5,153.47 6,532.35 2,290.39 5,972,394.97 351,940.82 0.13 4,780.55 MWD+IFR-AK-CAZ-SC(5)
9,422.26 65.00 20.98 5,264.05 5,193.14 6,611.94 2,320.44 5,972,473.93 351,972.45 0.57 4,837.82 MWD+IFR-AK-CAZ-SC(5)
9,516.86 64.84 20.60 5,304.15 5,233.24 6,692.04 2,350.85 5,972,553.40 352,004.46 0.40 4,895.39 MWD+IFR-AK-CAZ-SC(5)
9,610.96 64.78 20.77 5,344.20 5,273.29 6,771.71 2,380.93 5,972,632.44 352,036.13 0.18 4,952.71 MWD+IFR-AK-CAZ-SC(5)
9,705.84 64.97 20.74 5,384.49 5,313.58 6,852.03 2,411.37 5,972,712.14 352,068.17 0.20 5,010.47 MWD+IFR-AK-CAZ-SC(5)
9,799.43 65.04 20.61 5,424.03 5,353.12 6,931.40 2,441.32 5,972,790.88 352,099.70 0.15 5,067.58 MWD+IFR-AK-CAZ-SC(5)
9,894.11 65.00 19.59 5,464.02 5,393.11 7,011.99 2,470.82 5,972,870.86 352,130.80 0.98 5,126.00 MWD+IFR-AK-CAZ-SC(5)
9,987.56 64.97 18.35 5,503.53 5,432.62 7,092.07 2,498.34 5,972,950.37 352,159.93 1.20 5,184.86 MWD+IFR-AK-CAZ-SC(5)
10,081.55 64.93 18.04 5,543.33 5,472.42 7,172.96 2,524.93 5,973,030.70 352,188.13 0.30 5,244.86 MWD+IFR-AK-CAZ-SC(5)
10,175.01 '64.90 17.10 5,582.95 5,512.04 7,253.66 2,550.48 5,973,110.86 352,215.29 0.91 5,305.16 MWD+IFR-AK-CAZ-SC(5)
10,268.88 64.97 15.94 5,622.72 5,551.81 7,335.18 2,574.66 5,973,191.87 352,241.10 1.12 5,366.82 MWD+IFR-AK-CAZ-SC(5)
10,362.70 65.07 16.35 5,662.34 5,591.43 7,416.87 2,598.31 5,973,273.07 352,266.38 0.41 5,428.87 MWD+IFR-AK-CAZ-SC(5)
10,456.06 65.07 16.19 5,701.70 5,630.79 7,498.14 2,622.03 5,973,353.84 352,291.72 0.16 5,490.51 MWD+IFR-AK-CAZ-SC(5)
10,549.71 64.98 15.78 5,741.24 5,670.33 7,579.75 2,645.41 5,973,434.96 352,316.72 0.41 5,552.62 MWD+IFR-AK-CAZ-SC(5)
10,643.31 64.52 15.97 5,781.16 5,710.25 7,661.18 2,668.56 5,973,515.90 352,341.51 0.52 5,614.66 MWD+IFR-AK-CAZ-SC(5)
10,737.14 64.53 16.40 5,821.52 5,750.61 7,742.53 2,692.17 5,973,596.76 352,366.74 0.41 5,676.42 MWD+IFR-AK-CAZ-SC(5)
10,830.73 64.53 17.15 5,861.77 5,790.86 7,823.42 2,716.56 5,973,677.14 352,392.74 0.72 5,737.43 MWD+IFR-AK-CAZ-SC(5)
10,924.38 64.57 17.87 5,902.01 5,831.10 7,904.07 2,742.00 5,973,757.25 352,419.79 0.70 5,797.73 MWD+IFR-AK-CAZ-SC(5)
11,018.14 64.63 17.21 5,942.23 5,871.32 7,984.82 2,767.53 5,973,837.48 352,446.93 0.64 5,858.10 MWD+IFR-AK-CAZ-SC(5)
11,111.87 64.46 16.95 5,982.52 5,911.61 8,065.72 2,792,38 5,973,917.86 352,473.40 0.31 5,918.90 MWD+IFR-AK-CAZ-SC(5)
11,205.39 64.55 18.11 6,022.77 5,951.86 8,146.21 2,817.81 5,973,997.82 352,500.43 1.12 5,979.07 MWD+IFR-AK-CAZ-SC(5)
11,299.08 64.46 19.73 6,063.10 5,992.19 8,226.21 2,845.23 5,974,077.24 352,529.45 1.56 6,037.90 MWD+IFR-AK-CAZ-SC(5)
11,392.62 64.47 20.87 6,103.42 6,032.51 8,305.37 2,874.51 5,974,155.79 352,560.31 1.10 6,095.14 MWD+IFR-AK-CAZ-SC(5)
11,486.42 64.56 21.91 6,143.78 6,072.87 8,384.21 2,905.39 5,974,233.99 352,592.76 1.01 6,151.36 MWD+IFR-AK-CAZ-SC(5)
11,580.30 64.54 22.36 6,184.13 6,113.22 8,462.73 2,937.33 5,974,311.85 352,626.26 0.43 6,206.83 MWD+IFR-AK-CAZ-SC(5)
11,674.33 64.46 22.52 6,224.61 6,153.70 8,541.17 2,969.73 5,974,389.62 352,660.22 0.18 6,262.01 MWD+IFR-AK-CAZ-SC(5)
11,768.58 64.46 22.42 6,265.24 6,194.33 8,619.76 3,002.23 5,974,467.53 352,694.29 0.10 6,317.27 MWD+IFR-AK-CAZ-SC(5)
11,861.69 64.50 21.80 6,305.36 6,234.45 8,697.60 3,033.86 5,974,544.72 352,727.47 0.60 6,372.28 MWD+IFR-AK-CAZ-SC(5)
5/31/2016 3:41:28PM Page 5 COMPASS 5000.1 Build 74
• i
SLB
Definitive Survey Report
Company: NADConversion Local Co-ordinate Reference: Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Survey
Map Map Vertical
MD Inc Azi TVD TVDSS +NI-S +E/-W Northing Easting DLS Section
(usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name
11,955.72 64.46 21.03 6,345.87 6,274.96 8,776.60 3,064.84 5,974,623.08 352,760.03 0.74 6,428.60 MWD+IFR-AK-CAZ-SC(5)
12,048.98 64.46 20.63 6,386.08 6,315.17 8,855.25 3,094.76 5,974,701.10 352,791.52 0.39 6,485.09 MWD+IFR-AK-CAZ-SC(5)
12,142.16 64.46 19.46 6,426.25 6,355.34 8,934.23 3,123.58 5,974,779.48 352,821.91 1.13 6,542.38 MWD+1FR-AK-CAZ-SC(5)
12,236.62 65.01 18.82 6,466.57 6,395.66 9,014.93 3,151.59 5,974,859.60 352,851.52 0.85 6,601.57 MWD+IFR-AK-CAZ-SC(5)
12,330.18 64.88 19.55 6,506.19 6,435.28 9,094.98 3,179.44 5,974,939.07 352,880.97 0.72 6,660.25 MWD+IFR-AK-CAZ-SC(5)
12,423.70 65.01 19.79 6,545.79 6,474.88 9,174.75 3,207.95 5,975,018.25 352,911.08 0.27 6,718.38 MWD+IFR-AK-CAZ-SC(5)
12,517.46 65.01 18.71 6,585.41 6,514.50 9,254.98 3,235.97 5,975,097.90 352,940.70 1.04 6,777.15 MWD+IFR-AK-CAZ-SC(5)
12,611.56 64.91 18.21 6,625.23 6,554.32 9,335.85 3,262.97 5,975,178.20 352,969.31 0.49 6,836.95 MWD+IFR-AK-CAZ-SC(5)
12,705.00 65.04 17.31 6,664.76 6,593.85 9,416.48 3,288.79 5,975,258.30 352,996.74 0.88 6,897.07 MWD+IFR-AK-CAZ-SC(5)
12,798.22 65.01 16.69 6,704.12 6,633.21 9,497.29 3,313.50 5,975,338.59 353,023.06 0.60 6,957.85 MWD+IFR-AK-CAZ-SC(5)
12,892.14 65.04 15.62 6,743.78 6,672.87 9,579.07 3,337.19 5,975,419.87 353,048.38 1.03 7,019.96 MWD+IFR-AK-CAZ-SC(5)
12,985.83 65.07 15.33 6,783.29 6,712.38 9,660.94 3,359.85 5,975,501.26 353,072.68 0.28 7,082.62 MW0+IFR-AK-CAZ-SC(5)
13,079.99 65.01 16.97 6,823.03 6,752.12 9,742.93 3,383.60 5,975,582.75 353,098.06 1.58 7,144.89 MWD+IFR-AK-CAZ-SC(5)
13,174.22 65.03 18.03 6,862.82 6,791.91 9,824.39 3,409.28 5,975,663.68 353,125.37 1.02 7,205.81 MWD+IFR-AK-CAZ-SC(5)
13,267.06 65.10 17.94 6,901.96 6,831.05 9,904.46 3,435.27 5,975,743.21 353,152.96 0.12 7,265.36 MWD+IFR-AK-CAZ-SC(5)
13,360.23 65.21 18.15 6,941.11 6,870.20 9,984.85 3,461.46 5,975,823.05 353,180.76 0.24 7,325.10 MWD+IFR-AK-CAZ-SC(5)
13,454.36 66.25 15.89 6,979.80 6,908.89 10,066.90 3,486.57 5,975,904.57 353,207.50 2.45 7,386.80 MWD+IFR-AK-CAZ-SC(5)
13,548.12 67.43 13.85 7,016.68 6,945.77 10,150.21 3,508.69 5,975,987.41 353,231.28 2.36 7,450.99 MWD+IFR-AK-CAZ-SC(5)
13,641.45 67.37 12.22 7,052.55 6,981.64 10,234.15 3,528.12 5,976,070.94 353,252.39 1.61 7,516.96 MWD+IFR-AK-CAZ-SC(5)
13,734.73 67.57 10.04 7,088.30 7,017.39 10,318.68 3,544.75 5,976,155.12 353,270.71 2.17 7,584.73 MWD+IFR-AK-CAZ-SC(5)
13,828.66 68.58 7.28 7,123.37 7,052.46 10,404.81 3,557.86 5,976,240.96 353,285.54 2.93 7,655.52 MWD+IFR-AK-CAZ-SC(5)
13,922.51 69.16 4.61 7,157.21 7,086.30 10,491.87 3,566.92 5,976,327.82 353,296.35 2.72 7,728.98 MWD+IFR-AK-CAZ-SC(5)
14,015.86 71.24 2.49 7,188.83 7,117.92 10,579.53 3,572.35 5,976,415.34 353,303.53 3.09 7,804.61 MWD+IFR-AK-CAZ-SC(5)
14,109.74 72.17 1.17 7,218.30 7,147.39 10,668.61 3,575.19 5,976,504.34 353,308.16 1.66 7,882.70 MWD+IFR-AK-CAZ-SC(5)
14,203.20 73.56 359.42 7,245.84 7,174.93 10,757.92 3,575.65 5,976,593.61 353,310.40 2.33 7,962.06 MWD+IFR-AK-CAZ-SC(5)
14,297.60 74.82 357.41 7,271.56 7,200.65 10,848.70 3,573.13 5,976,684.42 353,309.70 2.45 8,044.10 MWD+IFR-AK-CAZ-SC(5)
14,391.41 76.65 353.89 7,294.68 7,223.77 10,939.34 3,566.22 5,976,775.17 353,304.62 4.13 8,127.99 MWD+IFR-AK-CAZ-SC(5)
14,485.80 79.80 349.28 7,313.95 7,243.04 11,030.70 3,552.69 5,976,866.79 353,292.91 5.83 8,215.54 MWD+IFR-AK-CAZ-SC(5)
14,579.41 80.82 347.43 7,329.71 7,258.80 11,121.07 3,534.06 5,976,957.50 353,276.10 2.23 8,304.52 MWD+IFR-AK-CAZ-SC(5)
14,638.89 80.89 346.75 7,339.16 7,268.25 11,178.31 3,520.94 5,977,014.99 353,264.13 1.13 8,361.48 MWD+IFR-AK-CAZ-SC(5)
14,694.60 82.26 346.19 7,347.33 7,276.42 11,231.89 3,508.05 5,977,068.81 353,252.32 2.65 8,415.07
100.00000010
7-5/8"X 9-7/8"by 11"
14,705.18 82.52 346.09 7,348.73 7,277.82 11,242.07 3,505.54 5,977,079.04 353,250.01 2.65 8,425.28 1NC+TREND(6)
14,800.56 82.63 345.15 7,361.05 7,290.14 11,333.69 3,482.05 5,977,171.10 353,228.37 0.98 8,517.57 MWD+IFR-AK-CAZ-SC(7)
14,896.02 82.73 346.07 7,373.22 7,302.31 11,425.40 3,458.52 5,977,263.26 353,206.68 0.96 8,609.97 MWD+IFR-AK-CAZ-SC(7)
14,903.65 83.03 345.72 7,374.16 7,303.25 11,432.74 3,456.67 5,977,270.64 353,204.98 6.05 8,617.35 1•. , ,-.-- -� ')
4-1/2"x 6-314" m _J
14,991.28 86.53 341.72 7,382.13 7,311.22 11,516.48 3,432.21 5,977,354.84 353,182.20 6.05 8,703.07 MWD+IFR-AK-CAZ-SC(7)
15,086.72 87.45 341.68 7,387.14 7,316.23 11,606.96 3,402.28 5,977,445.90 353,154.10 0.96 8,797.28 MWD+IFR-AK-CAZ-SC(7)
15,182.10 89.13 339.29 7,389.99 7,319.08 11,696.82 3,370.44 5,977,536.37 353,124.06 3.06 8,891.79 MWD+IFR-AK-CAZ-SC(7)
5/31/2016 3:41:28PM Page 6 COMPASS 5000.1 Build 74
Ill i
SLB
Definitive Survey Report
Company: NADConversion Local Co-ordinate Reference: Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Survey
Map Map Vertical
MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section
(usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name
15,277.63 91.92 337.35 7,389.12 7,318.21 11,785.57 3,335.15 5.977,625.80 353,090.57 3.56 8,986.89 MWD+IFR-AK-CAZ-SC(7)
15,372.06 91.30 336.64 7,386.46 7,315.55 11,872.46 3,298.27 5,977,713.40 353,055.43 1.00 9,081.05 MWD+IFR-AK-CAZ-SC(7)
15,467.88 9064 336.36 7,384.84 7,313.93 11,960.32 3,260.06 5,977,802.00 353,019.00 0.75 9,176.68 MWD+IFR-AK-CAZ-SC(7)
15,562.83 90.19 334.82 7,384.15 7,313.24 12,046.77 3,220.83 5,977,889.22 352,981.51 1.69 9,271.53 MWD+IFR-AK-CAZ-SC(7)
15,658.54 90.20 333.60 7,383.83 7,312.92 12,132.95 3,179.19 5,977,976.21 352,941.60 1.27 9,367.22 MWD+IFR-AK-CAZ-SC(7)
15,754.40 90.47 332.23 7,383.27 7,312.36 12,218.29 3,135.54 5,978,062.41 352,899.68 1.46 9,463.07 MWD+IFR-AK-CAZ-SC(7)
15,849.11 90.96 331.16 7,382.08 7,311.17 12,301.67 3,090.64 5,978,146.66 352,856.46 1.24 9,557.75 MWD+IFR-AK-CAZ-SC(7)
15,944.62 91.03 330.32 7,380.43 7,309.52 12,384.98 3,043.96 5,978,230.88 352,811.47 0.88 9,653.17 MWD+IFR-AK-CAZ-SC(7)
16,041.42 90.17 330.23 7,379.41 7,308.50 12,469.04 2,995.97 5,978,315.88 352,765.17 0.89 9,749.85 MWD+IFR-AK-CAZ-SC(7)
16,136.33 89.30 329.43 7,379.85 7,308.94 12,551.09 2,948.27 5,978,398.86 352,719.13 1.25 9,844.61 MWD+IFR-AK-CAZ-SC(7)
16,231.27 88.79 327.31 7,381.43 7,310.52 12,631.91 2,898.49 5,978,480.66 352,670.99 2.30 9,939.23 MWD+IFR-AK-CAZ-SC(7)
16,326.82 88.73 327.14 7,383.50 7,312.59 12,712.23 2,846.78 5,978,561.99 352,620.90 0.19 10,034.27 MWD+IFR-AK-CAZ-SC(7)
16,421.37 87.99 327.13 7,386.21 7,315.30 12,791.61 2,795.49 5,978,642.38 352,571.21 0.78 10,128.28 MWD+IFR-AK-CAZ-SC(7)
16,516.28 88.50 327.49 7,389.11 7,318.20 12,871.45 2,744.26 5,978,723.23 352,521.59 0.66 10,222.68 MWD+IFR-AK-CAZ-SC(7)
16,612.09 88.10 327.65 7,391.96 7,321.05 12,952.28 2,692.90 5,978,805.07 352,471.87 0.45 10,318.02 MWD+IFR-AK-CAZ-SC(7)
16,707.39 88.52 326.90 7,394.77 7,323.86 13,032.42 2,641.40 5,978,886.21 352,421.99 0.90 10,412.80 MWD+IFR-AK-CAZ-SC(7)
16,802.85 88.78 326.89 7,397.02 7,326.11 13,112.36 2,589.28 5,978,967.18 352,371.49 0.27 10,507.69 MWD+IFR-AK-CAZ-SC(7)
16,897.48 90.07 326.52 7,397.97 7,327.06 13,191.46 2,537.33 5,979,047.29 352,321.14 1.42 10,601.75 MWD+IFR-AK-CAZ-SC(7)
16,993.13 90.41 326.20 7,397.57 7,326.66 13,271.09 2,484.35 5,979,127.96 352,269.76 0.49 10,696.75 MWD+IFR-AK-CAZ-SC(7)
17,088.44 90.37 327.56 7,396.92 7,326.01 13,350.91 2,432.27 5,979,208.80 352,219.30 1.43 10,791.52 MWD+IFR-AK-CAZ-SC(7)
17,183.65 90.67 329.81 7,396.05 7,325.14 13,432.24 2,382.79 5,979,291.10 352,171.47 2.38 10,886.45 MWD+IFR-AK-CAZ-SC(7)
17,279.11 91.39 331.60 7,394.34 7,323.43 13,515.47 2,336.09 5,979,375.25 352,126.45 2.02 10,981.81 MWD+IFR-AK-CAZ-SC(7)
17,374.41 92.69 333.20 7,390.94 7,320.03 13,599.87 2,291.97 5,979,460.51 352,084.03 2.16 11,077.04 MWD+IFR-AK-CAZ-SC(7)
17,469.90 92.38 334.38 7,386.72 7,315.81 13,685.46 2,249.84 5,979,546.92 352,043.63 1.28 11,172.43 MWD+IFR-AK-CAZ-SC(7)
17,565.11 90.27 335.38 7,384.52 7,313.61 13,771.63 2,209.44 5,979,633.88 352,004.96 2.45 11,267.55 MWD+IFR-AK-CAZ-SC(7)
17,660.35 91.16 336.01 7,383.33 7,312.42 13,858.42 2,170.24 5,979,721.43 351,967.51 1.14 11,362.68 MWD+IFR-AK-CAZ-SC(7)
17,756.34 91.86 337.23 7,380.80 7,309.89 13,946.50 2,132.16 5,979,810.25 351,931.21 1.46 11,458.44 MWD+IFR-AK-CAZ-SC(7)
17,851.20 89.07 337.91 7,380.03 7,309.12 14,034.17 2,095.97 5,979,898.62 351,896.79 3.03 11,552.99 MWD+IFR-AK-CAZ-SC(7)
17,946.61 89.22 337.58 7,381.45 7,310.54 14,122.46 2,059.84 5,979,987.61 351,862.44 0.38 11,648.06 MWD+IFR-AK-CAZ-SC(7)
18,042.17 90.76 336.40 7,381.47 7,310.56 14,210.42 2,022.49 5,980,076.29 351,826.86 2.03 11,743.38 MWD+IFR-AK-CAZ-SC(7)
18,137.04 91.66 335.78 7,379.47 7,308.56 14,297.12 1,984.05 5,980,163.74 351,790.17 1.15 11,838.09 MWD+IFR-AK-CAZ-SC(7)
18,233.10 91.08 334.89 7,377.17 7,306.26 14,384.39 1,943.97 5,980,251.79 351,751.85 1.11 11,934.04 MWD+IFR-AK-CAZ-SC(7)
18,328.85 91.05 333.50 7,375.39 7,304.48 14,470.58 1,902.30 5,980,338.79 351,711.92 1.45 12,029.75 MWD+IFR-AK-CAZ-SC(7)
18,422.92 91.44 332.28 7,373.35 7,302.44 14,554.29 1,859.44 5,980,423.34 351,670.75 1.36 12,123.80 MWD+IFR-AK-CAZ-SC(7)
18,518.07 91.67 332.85 7,370.76 7,299.85 14,638.71 1,815.62 5,980,508.61 351,628.63 0.65 12,218.91 MWD+IFR-AK-CAZ-SC(7)
18,613.24 92.23 332.52 7,367.53 7,296.62 14,723.22 1,771.97 5,980,593.97 351,586.69 0.68 12,314.02 MWD+IFR-AK-CAZ-SC(7)
18,708.23 92.05 332.66 7,363.98 7,293.07 14,807.48 1,728.28 5,980,679.09 351,544.69 0.24 12,408.94 MWD+IFR-AK-CAZ-SC(7)
18,803.79 92.07 332.88 7,360.54 7,289.63 14,892.40 1,684.58 5,980,764.86 351,502.71 0.23 12,504.44 MWD+IFR-AK-CAZ-SC(7)
18,898.92 90.28 333.20 7,358.59 7,287.68 14,977.17 1,641.46 5,980,850.47 351,461.30 1.91 12,599.55 MWD+IFR-AK-CAZ-SC(7)
18,993.36 90.51 333.47 7,357.94 7,287.03 15,061.56 1,599.08 5,980,935.69 351,420.62 0.38 12,693.98 MWD+IFR-AK-CAZ-SC(7)
5/31/2016 3:41:28PM Page 7 COMPASS 5000.1 Build 74
. •
SLB
Definitive Survey Report
Company: NADConversion Local Co-ordinate Reference: Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Survey
Map Map Vertical
MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section
(usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name
19,088.29 90.34 334.21 7,357.24 7,286.33 15,146.77 1,557.23 5,981,021.70 351,380.49 0.80 12,788.90 MWD+IFR-AK-CAZ-SC(7)
19,184.57 89.99 335.03 7,356.96 7,286.05 15,233.75 1,515.96 5,981,109.49 351,340.98 0.93 12,885.14 MWD+IFR-AK-CAZ-SC(7)
19,280.54 90.28 334.36 7,356.74 7,285.83 15,320.51 1,474.94 5,981,197.05 351,301.71 0.76 12,981.07 MWD+IFR-AK-CAZ-SC(7)
19,375.26 89.84 335.10 7,356.64 7,285.73 15,406.17 1,434.51 5,981,283.49 351,263.00 0.91 13,075.74 MWD+IFR-AK-CAZ-SC(7)
19,470.92 90.42 335.06 7,356.42 7,285.51 15,492.92 1,394.20 5,981,371.03 351,224.44 0.61 13,171.34 MWD+IFR-AK-CAZ-SC(7)
19,566.20 89.92 333.67 7,356.14 7,285.23 15,578.82 1,352.98 5,981,457.73 351,184.96 1.55 13,266.59 MWD+IFR-AK-CAZ-SC(7)
19,661.88 89.63 331.81 7,356.51 7,285.60 15,663.87 1,309.16 5,981,543.64 351,142.85 1.97 13,362.26 MWD+IFR-AK-CAZ-SC(7)
19,756.90 90.72 331.55 7,356.22 7,285.31 15,747.51 1,264.08 5,981,628.16 351,099.46 1.18 13,457.26 MWD+IFR-AK-CAZ-SC(7)
19,851.65 91.31 331.43 7,354.54 7,283.63 15,830.76 1,218.86 5,981,712.29 351,055.93 0.64 13,551.96 MWD+IFR-AK-CAZ-SC(7)
19,947.51 91.22 330.77 7,352.43 7,281.52 15,914.66 1,172.55 5,981,797.10 351,011.30 0.69 13,647.74 MWD+IFR-AK-CAZ-SC(7)
20,043.00 91.63 330.48 7,350.05 7,279.14 15,997.85 1,125.72 5,981,881.20 350,966.16 0.53 13,743.12 MWD+IFR-AK-CAZ-SC(7)
20,137.95 90.34 332.24 7,348.42 7,277.51 16,081.16 1,080.22 5,981,965.40 350,922.34 2.30 13,838.01 MWD+IFR-AK-CAZ-SC(7)
20,233.02 89.08 332.63 7,348.90 7,277.99 16,165.44 1,036.23 5,982,050.54 350,880.05 1.39 13,933.07 MWD+IFR-AK-CAZ-SC(7)
20,328.02 89.18 332.16 7,350.34 7,279.43 16,249.62 992.22 5,982,135.57 350,837.73 0.51 14,028.06 MWD+IFR-AK-CAZ-SC(7)
20,422.84 88.72 334.98 7,352.08 7,281.17 16,334.50 950.02 5,982,221.28 350,797.25 3.01 14,122.85 MWD+IFR-AK-CAZ-SC(7)
20,518.71 88.83 333.79 7,354.13 7,283.22 16,420.93 908.59 5,982,308.51 350,757.56 1.25 14,218.66 MWD+IFR-AK-CAZ-SC(7)
20,613.26 88.99 333.90 7,355.93 7,285.02 16,505.78 866.92 5,982,394.18 350,717.60 0.21 14,313.19 MWD+IFR-AK-CAZ-SC(7)
20,709.19 89.76 332.15 7,356.98 7,286.07 16,591.27 823.41 5,982,480.51 350,675.82 1.99 14,409.11 MWD+IFR-AK-CAZ-SC(7)
20,804.26 90.21 331.98 7,357.00 7,286.09 16,675.26 778.87 5,982,565.37 350,632.97 0.51 14,504.16 MWD+IFR-AK-CAZ-SC(7)
20,900.16 89.91 330.48 7,356.90 7,285.99 16,759.32 732.71 5,982,650.33 350,588.52 1.60 14,600.02 MWD+IFR-AK-CAZ-SC(7)
20,994.46 90.78 328.88 7,356.33 7,285.42 16,840.71 685.11 5,982,732.66 350,542.56 1.93 14,694.15 MWD+IFR-AK-CAZ-SC(7)
21,089.89 89.43 330.11 7,356.16 7,285.25 16,922.93 636.67 5,982,815.83 350,495.78 1.91 14,789.40 MWD+IFR-AK-CAZ-SC(7)
21,185.21 92.10 330.80 7,354.89 7,283.98 17,005.84 589.68 5,982,899.66 350,450.46 2.89 14,884.61 MWD+IFR-AK-CAZ-SC(7)
21,281.17 90.90 331.37 7,352.37 7,281.46 17,089.81 543.30 5,982,984.53 350,405.78 1.38 14,980.48 MWD+IFR-AK-CAZ-SC(7)
21,376.71 91.02 331.70 7,350.77 7,279.86 17,173.79 497.77 5,983,069.40 350,361.94 0.37 15,075.97 MWD+IFR-AK-CAZ-SC(7)
21,472.20 91.19 330.96 7,348.93 7,278.02 17,257.55 451.96 5,983,154.06 350,317.83 0.79 15,171.41 MWD+IFR-AK-CAZ-SC(7)
21,567.37 91.35 331.40 7,346.82 7,275.91 17,340.91 406.10 5,983,238.32 350,273.65 0.49 15,266.50 MWD+IFR-AK-CAZ-SC(7)
21,662.92 90.30 333.19 7,345.45 7,274.54 17,425.50 361.68 5,983,323.77 350,230.94 2.17 15,362.03 MWD+IFR-AK-CAZ-SC(7)
21,759.64 89.49 333.11 7,345.62 7,274.71 17,511.79 318.00 5,983,410.91 350,188.99 0.84 15,458.75 MWD+IFR-AK-CAZ-SC(7)
21,854.74 90.32 333.03 7,345.78 7,274.87 17,596.57 274.93 5,983,496.54 350,147.63 0.88 15,553.85 MWD+IFR-AK-CAZ-SC(7)
21,948.62 89.85 334.78 7,345.64 7,274.73 17,680.88 233.63 5,983,581.65 350,108.04 1.93 15,647.71 MWD+IFR-AK-CAZ-SC(7)
22,106.00 89.85 334.78 7,346.05 7,275.14 17,823.26 166.58 5,983,725.33 350,043.86 0.00 15,805.02 PROJECTED to TD
5/31/2016 3:41:28PM Page 8 COMPASS 5000.1 Build 74
• •
Final Definitive Survey
Verified and Signed-off
All targets and/or well position objectives have been achieved.
Yes ❑ No
I have checked to the best of my ability that the following data is correct:
0 Surface Coordinates
Declination & Convergence
GRS Survey Corrections Digitally signed by Brij
El Survey Tool Codes A Hall-Potnis
Date:2016.05.31
SLB DE: 15:43:20-08'00'
m Digitallysigned by William hart
Client Representative: viii a't' LarFlart Da[e 2016.0531161]11-0Ear8'00'
Date:
• 216068
27292
14eic.°44
i
FINAL
\ J
ConocoPhillips(Alaska) Inc. -WNS
Western North Slope
CD5 Alpine West Pad
CD5-02A
CD5-02A
NAD 83
Definitive Survey Report
31 May, 2016
• •
SLB
Definitive Survey Report
Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Project Western North Slope,North Slope Alaska,United States
Map System: US State Plane 1983 System Datum: Mean Sea Level
Geo Datum: North American Datum 1983 Using Well Reference Point
Map Zone: Alaska Zone 4 Using geodetic scale factor
Well CD5-02
Well Position +N/-S 0.00 usft Northing: 5,965,656.28 usft Latitude: 70°18'49.099 N
+El-W 0.00 usft Easting: 1,489,553.29 usft Longitude: 151°13'21.934 W
Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 34.10 usft
Wellbore CD5-02A
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
(0) (0) (nT)
BGGM2015 4/1/2016 17.70 80.83 57,468
Design CD5-02A
Audit Notes:
Version: 1.0 Phase: ACTUAL Tie On Depth: 2,360.57
Vertical Section: Depth From(TVD) +N/-S +EI-W Direction
(usft) (usft) (usft) (0)
36.81 0.00 0.00 333.00
Survey Program Date 5/31/2016
From To
(usft) (usft) Survey(Wellbore) Tool Name Description Survey Date
100.00 600.00 CD5-02 Svy1-SLB_NSG+MSHOT(CD5 GYD-GC-MS Gyrodata gyrocompassing m/s 3/28/2016 8:50:.
662.12 2,360.57 CD5-02 Svy2-SLB_MWD+GMAG(CD5 MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 3/28/2016 9:01:
2,452.74 2,639.97 CD5-02A Svy1-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/6/2016 11:29:2
2,734.99 2,734.99 CD5-02A Svy2-SLB_INC-FILLER(CD5 INC+TREND Inclinometer+known azi trend 5/6/2016 11:29:2
2,828.57 14,638.89 CD5-02A Svy3-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/6/2016 11:29:2
14,705.18 14,705.18 CD5-02A Svy4-SLB_INC+FILLER(CD5 INC+TREND Inclinometer+known azi trend 5/19/2016 10:50
14,800.56 21,948.62 CD5-02A Svy5-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/19/2016 10:52
Survey
Map Map Vertical
MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section
(usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) 0100') (ft) Survey Tool Name
36.81 0.00 0.00 36.81 -34.10 0.00 0.00 5,965,656.28 1,489:553.29 0.00 0.00 UNDEFINED
100.00 0.25 21.97 100.00 29.09 0.13 0.05 5,965,656.41 1,489,553.34 0.40 0.09 GYD-GC-MS(1)
200.00 0.45 336.14 200.00 129.09 0.69 -0.03 5,965,656.97 1,489,553.28 0.33 0.63 GYD-GC-MS(1)
300.00 0.49 331.59 299.99 229.08 1.42 -0.39 5,965,657.71 1,489,552.93 0.05 1.45 GYD-GC-MS(1)
400.00 1.00 12.41 399.99 329.08 2.65 -0.40 5,965,658.94 1,489,552.94 0.71 2.55 GYD-GC-MS(1)
500.00 1.76 29.10 499.96 429.05 4.85 0.53 5,965,661.11 1,489,553.92 0.85 4.08 GYD-GC-MS(1)
600.00 2.46 21.57 599.89 528.98 8.18 2.07 5,965,664.42 1,489,555.52 0.75 6.35 GYD-GC-MS(1)
662.12 2.50 4.37 661.95 591.04 10.78 2.66 5,965,667.00 1,489,556.17 1.20 8.39 MWD+IFR-AK-CAZ-SC(2)
754.58 4.34 355.28 754.24 683.33 16.27 2.53 5,965,672.50 1,489,556.14 2.07 13.35 MWD+IFR-AK-CAZ-SC(2)
5/31/2016 2:16:44PM Page 2 COMPASS 5000.1 Build 74
• •
SLB
Definitive Survey Report
Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Survey
Map Map Vertical
MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section
(usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) (°l100') (ft) Survey Tool Name
848.35 7.24 354.20 847.53 776.62 25.69 1.64 5,965,681.93 1,489,555.44 3.09 22.15 MWD+IFR-AK-CAZ-SC(2)
942.30 9.87 357.07 940.42 869.51 39.62 0.63 5,965,695.88 1,489,554.71 2.84 35.02 MWD+IFR-AK-CAZ-SC(2)
1,036.06 11.67 359.72 1,032.53 961.62 57.13 0.17 5,965,713.39 1,489,554.61 1.99 50.83 MWD+IFR-AK-CAZ-SC(2)
1,131.13 13.07 1.08 1,125.39 1,054.48 77.50 0.32 5,965,733.75 1,489,555.17 1.50 68.90 MWD+IFR-AK-CAZ-SC(2)
1,225.92 14.67 4.82 1,217.41 1,146.50 100.18 1.54 5,965,756.40 1,489,556.84 1.93 88.56 MWD+IFR-AK-CAZ-SC(2)
1,318.58 19.54 12.24 1,305.96 1,235.05 127.03 5.81 5,965,783.16 1,489,561.65 5.75 110.55 MWD+IFR-AK-CAZ-SC(2)
1,415.08 22.60 15.63 1,396.00 1,325.09 160.67 14.23 5,965,816.62 1,489,570.74 3.41 136.70 MWD+IFR-AK-CAZ-SC(2)
1,510.04 24.01 16.49 1,483.21 1,412.30 196.76 24.63 5,965,852.50 1,489,581.87 1.53 164.14 MWD+IFR-AK-CAZ-SC(2)
1,604.48 26.76 17.67 1,568.52 1,497.61 235.45 36.54 5,965,890.93 1,489,594.55 2.96 193.20 MWD+IFR-AK-CAZ-SC(2)
1,695.70 30.55 17.53 1,648.56 1,577.65 277.14 49.76 5,965,932.35 1,489,608.60 4.16 224.35 MWD+IFR-AK-CAZ-SC(2)
1,793.42 33.69 14.20 1,731.32 1,660.41 327.12 63.89 5,965,982.02 1,489,623.74 3.69 262.45 MWD+IFR-AK-CAZ-SC(2)
1,888.31 36.08 12.92 1,809.15 1,738.24 379.87 76.60 5,966,034.51 1,489,637.50 2.63 303.69 MWD+IFR-AK-CAZ-SC(2).
1,982.46 39.70 11.99 1,883.44 1,812.53 436.33 89.05 5,966,090.70 1,489,651.08 3.89 348.34 MWD+IFR-AK-CAZ-SC(2)
2,076.91 42.58 14.69 1,954.57 1,883.66 496.76 103.42 5,966,150.82 1,489,666.66 3.58 395.66 MWD+IFR-AK-CAZ-SC(2)
2,170.36 44.87 18.26 2,022.11 1,951.20 558.66 121.77 5,966,212.34 1,489,686.25 3.60 442.49 MWD+IFR-AK-CAZ-SC(2)
2,265.64 47.38 23.17 2,088.16 2,017.25 622.84 146.11 5,966,276.01 1,489,711.87 4.55 488.62 MWD+IFR-AK-CAZ-SC(2)
2,360.57 51.38 24.84 2,149.95 2,079.04 688.63 175.44 5,966,341.20 1,489,742.52 4.42 533.93 MWD+IFR-AK-CAZ-SC(2)
2,423.99 52.03 23.98 2,189.26 2,118.35 733.96 196.01 5,966,386.10 1,489,763.99 1.48 564.98
10-3/4"x 13-112
2,452.74 52.33 23.59 2,206.88 2,135.97 754.74 205.17 5,966,406.69 1,489,773.57 1.48 579.34 MWD+IFR-AK-CAZ-SC(3)
2,545.71 56.39 24.65 2,261.05 2,190.14 823.68 236.05 5,966,474.99 1,489,805.83 4.46 626.74 MWD+IFR-AK-CAZ-SC(3)
2,639.97 53.99 27.03 2,314.86 2,243.95 893.33 269.76 5,966,543.94 1,489,840.92 3.28 673.49 MWD+IFR-AK-CAZ-SC(3)
2,734.99 52.91 32.94 2,371.48 2,300.57 959.41 307.85 5,966,609.24 1,489,880.34 5.12 715.08 INC+TREND(4)
2,828.57 53.50 39.31 2,427.56 2,356.65 1,019.87 352.01 5,966,668.80 1,489,925.69 5.49 748.91 MWD+IFR-AK-CAZ-SC(5)
2,922.65 54.87 38.81 2,482.61 2,411.70 1,079.11 400.08 5,966,727.06 1,489,974.94 1.52 779.87 MWD+IFR-AK-CAZ-SC(5)
3,016.89 57.10 35.12 2,535.34 2,464.43 1,141.53 447.01 5,966,788.51 1,490,023.11 4.02 814.17 MWD+IFR-AK-CAZ-SC(5)
3,112.00 59.29 33.00 2,585.47 2,514.56 1,208.49 492.25 5,966,854.54 1,490,069.69 2.98 853.29 MWD+IFR-AK-CAZ-SC(5)
3,206.55 61.41 30.06 2,632.25 2,561.34 1,278.52 535.20 5,966,923.70 1,490,114.03 3.51 896.20 MWD+IFR-AK-CAZ-SC(5)
3,301.30 63.85 26.69 2,675.81 2,604.90 1,352.55 575.15 5,966,996.90 1,490,155.46 4.07 944.02 MWD+IFR-AK-CAZ-SC(5)
3,394.10 65.74 24.18 2,715.34 2,644.43 1,428.37 611.19 5,967,071.98 1,490,193.01 3.18 995.21 MWD+IFR-AK-CAZ-SC(5)
3,488.44 66.22 21.27 2,753.75 2,682.84 1,507.84 644.47 5,967,150.76 1,490,227.88 2.86 1,050.91 MWD+IFR-AK-CAZ-SC(5)
3,582.42 66.34 17.36 2,791.56 2,720.65 1,589.02 672.92 5,967,231,34 1,490,257.95 3.81 1,110.32 MWD+IFR-AK-CAZ-SC(5)
3,677.29 66.31 13.39 2,829.67 2,758.76 1,672.77 695.95 5,967,314.61 1,490,282.66 3.83 1,174.49 MWD+IFR-AK-CAZ-SC(5)
3,772.01 66.54 13.23 2,867.55 2,796.64 1,757.25 715.94 5,967,398.67 1,490,304.34 0.29 1,240.70 MWD+IFR-AK-CAZ-SC(5)
3,865.20 66.06 13.07 2,905.01 2,834.10 1,840.35 735.35 5,967,481.34 1,490,325.42 0.54 1,305.92 MWD+IFR-AK-CAZ-SC(5)
3,959.85 66.15 13.67 2,943.35 2,872.44 1,924.54 755.36 5,967,565.11 1,490,347.11 0.59 1,371.85 MWD+IFR-AK-CAZ-SC(5)
4,054.08 65.53 14.33 2,981.92 2,911.01 2,007.96 776.16 5,967,648.09 1,490,369.58 0.92 1,436.74 MWD+IFR-AK-CAZ-SC(5)
4,146.86 65.66 14.61 3,020.25 2,949.34 2,089.77 797.27 5,967,729.45 1,490,392.33 0.31 1,500.04 MWD+IFR-AK-CAZ-SC(5)
4,241.18 65.57 15.12 3,059.19 2,988.28 2,172.80 819.31 5,967,812.02 1,490,416.03 0.50 1,564.02 MWD+IFR-AK-CAZ-SC(5)
4,334.98 65.54 14.77 3,098.01 3,027.10 2,255.30 841.33 5,967,894.06 1,490,439.70 0.34 1,627.53 MWD+IFR-AK-CAZ-SC(5)
5/31/2016 2.16:44PM Page 3 COMPASS 5000.1 Build 74
•
• •
SLB
Definitive Survey Report
Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Survey
Map Map Vertical
MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section
(usft) (0) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name
4,428.97 65.53 15.61 3,136.94 3,066.03 2,337.86 863.75 5,967,976.14 1.490,463.77 0.81 1,690.92 MWD+IFR-AK-CAZ-SC(5)
4,524.52 65.58 16.41 3,176.48 3,105.57 2,421.47 887.74 5,968,059.25 1,490,489.44 0.76 1,754.52 MWD+IFR-AK-CAZ-SC(5)
4,616.05 65.12 16.77 3,214.65 3,143.74 2,501.20 911.49 5,968,138.48 1,490,514.78 0.62 1,814.78 MWD+IFR-AK-CAZ-SC(5)
4,709.66 64.92 17.04 3,254.18 3,183.27 2,582.39 936.17 5,968,219.14 1,490,541.08 0.34 1,875.91 MWD+IFR-AK-CAZ-SC(5)
4,804.04 65.06 17.52 3,294.09 3,223.18 2,664.06 961.57 5,968,300.28 1,490,568.12 0.48 1,937.15 MWD+IFR-AK-CAZ-SC(5)
4,898.96 65.00 18.21 3,334.16 3,263.25 2,745.95 987.97 5,968,381.63 1,490,596.16 0.66 1,998.13 MWD+IFR-AK-CAZ-SC(5)
4,991.95 64.90 18.02 3,373.53 3,302.62 2,826.02 1,014.16 5,968,461.15 1,490,623.95 0.21 2,057.58 MWD+IFR-AK-CAZ-SC(5)
5,087.11 64.85 19.09 3,413.93 3,343.02 2,907.70 1,041.58 5,968,542.25 1,490,653.00 1.02 2,117.91 MWD+IFR-AK-CAZ-SC(5)
5,181.94 64.90 18.91 3,454.20 3,383.29 2,988.88 1,069.53 5,968,622.84 1,490,682.58 0.18 2,177.55 MWD+IFR-AK-CAZ-SC(5)
5,275.90 65.00 19.29 3,493.98 3,423.07 3,069.31 1,097.38 5,968,702.70 1,490,712.04 0.38 2,236.58 MWD+IFR-AK-CAZ-SC(5)
5,369.98 65.04 19.59 3,533.71 3,462.80 3,149.73 1,125.77 5,968,782.52 1,490,742.03 0.29 2,295.34 MWD+IFR-AK-CAZ-SC(5)
5,464.84 64.87 19.88 3,573.87 3,502.96 3,230.62 1,154.79 5,968,862.81 1,490,772.67 0.33 2,354.25 MWD+IFR-AK-CAZ-SC(5)
5,557.91 64.93 20.29 3,613.35 3,542.44 3,309.78 1,183.73 5,968,941.36 1,490,803.19 0.40 2,411.63 MWD+IFR-AK-CAZ-SC(5)
5,653.33 64.77 20.62 3,653.90 3,582.99 3,390.71 1,213.91 5,969,021.66 1,490,834.99 0.36 2,470.04 MWD+IFR-AK-CAZ-SC(5)
5,747.51 64.93 20.17 3,693.93 3,623.02 3,470.61 1,243.62 5,969,100.95 1,490,866.30 0.46 2,527.75 MW0+IFR-AK-CAZ-SC(5)
5,841.85 64.94 19.78 3,733.90 3,662.99 3,550.93 1,272.82 5,969,180.66 1,490,897.10 0.37 2,586.05 MWD+IFR-AK-CAZ-SC(5)
5,935.50 64.96 19.70 3,773.55 3,702.64 3,630.78 1,301.47 5,969,259.91 1,490,927.35 0.08 2,644.20 MWD+IFR-AK-CAZ-SC(5)
6,030.19 65.03 19.99 3,813.57 3,742.66 3,711.50 1,330.60 5,969,340.02 1,490,958.10 0.29 2,702.89 MWD+IFR-AK-CAZ-SC(5)
6,124.34 65.07 19.90 3,853.29 3,782.38 3,791.75 1,359.72 5,969,419.66 1,490,988.82 0.10 2,761.17 MWD+IFR-AK-CAZ-SC(5)
6,218.84 65.09 18.95 3,893.11 3,822.20 3,872.57 1,388.22 5,969,499.89 1,491,018.94 0.91 2,820.24 MWD+IFR-AK-CAZ-SC(5)
6,312.39 64.99 18.59 3,932.58 3,861.67 3,952.87 1,415.51 5,969,579.62 1,491,047.83 0.36 2,879.40 MWD+IFR-AK-CAZ-SC(5)
6,406.81 65.07 18.16 3,972.44 3,901.53 4,034.10 1,442.50 5,969,660.29 1,491,076.44 0.42 2,939.53 MWD+IFR-AK-CAZ-SC(5)
6,500.93 64.52 17.35 4,012.52 3,941.61 4,115.20 1,468.47 5,969,740.84 1,491,104.03 0.97 3,000.00 MWD+IFR-AK-CAZ-SC(5)
6,595.39 64.53 17.24 4,053.15 3,982.24 4,196.62 1,493.82 5,969,821.73 1,491,131.01 0.11 3,061.04 MWD+IFR-AK-CAZ-SC(5)
6,690.01 64.56 16.53 4,093.82 4,022.91 4,278.37 1,518.63 5,969,902.96 1,491,157.46 0.68 3,122.61 MWD+IFR-AK-CAZ-SC(5)
6,784.37 64.60 15.72 4,134.33 4,063.42 4,360.24 1,542.30 5,969,984.33 1,491,182.77 0.78 3,184.82 MWD+IFR-AK-CAZ-SC(5)
6,879.10 64.56 15.49 4,174.99 4,104.08 4,442.65 1,565.32 5,970,066.25 1,491,207.44 0.22 3,247.79 MWD+IFR-AK-CAZ-SC(5)
6,973.56 64.56 15.43 4,215.57 4,144.66 4,524.86 1,588.06 5,970,147.99 1,491,231.82 0.06 3,310.72 MWD+IFR-AK-CAZ-SC(5)
7,067.65 64.52 17.02 4,256.02 4,185.11 4,606.43 1,611.79 5,970,229.05 1,491,257.19 1.53 3,372.62 MWD+IFR-AK-CAZ-SC(5)
7,161.80 64.56 15.59 4,296.49 4,225.58 4,688.01 1,635.66 5,970,310.14 1,491,282.68 1.37 3,434.48 MWD+IFR-AK-CAZ-SC(5)
7,254.97 64.37 15.58 4,336.65 4,265.74 4,768.99 1,658.24 5,970,390.64 1,491,306.89 0.20 3,496.38 MWD+IFR-AK-CAZ-SC(5)
7,349.81 64.39 16.28 4,377.66 4,306.75 4,851.22 1,681.71 5,970,472.37 1,491,332.01 0.67 3,558.99 MWD+IFR-AK-CAZ-SC(5)
7,443.90 64.50 17.86 4,418.25 4,347.34 4,932.36 1,706.63 5,970,552.99 1,491,358.55 1.52 3,619.98 MWD+IFR-AK-CAZ-SC(5)
7,537.89 64.55 19.53 4,458.68 4,387.77 5,012.74 1,733.83 5,970,632.80 1,491,387.35 1.60 3,679.24 MWD+IFR-AK-CAZ-SC(5)
7,632.01 64.66 20.81 4,499.05 4,428.14 5,092.54 1,763.14 5,970,711.99 1,491,418.26 1.23 3,737.04 MWD+IFR-AK-CAZ-SC(5)
7,726.45 64.56 20.54 4,539.54 4,468.63 5,172.37 1,793.27 5,970,791.19 1,491,449.98 0.28 3,794.49 MWD+IFR-AK-CAZ-SC(5)
7,821.71 64.58 20.86 4,580.45 4,509.54 5,252.84 1,823.68 5,970,871.03 1,491,482.00 0.30 3,852.39 MWD+IFR-AK-CAZ-SC(5)
7,915.40 64.62 20.51 4,620.63 4,549.72 5,332.02 1,853.57 5,970,949.59 1,491,513.48 0.34 3,909.36 MWD+IFR-AK-CAZ-SC(5)
8,011.22 64.65 20.41 4,661.68 4,590.77 5,413.14 1,883.84 5,971,030.08 1,491,545.36 0.10 3,967.90 MWD+IFR-AK-CAZ-SC(5)
8,104.74 64.63 20.45 4,701.74 4,630.83 5,492.33 1,913.33 5,971,108.66 1,491,576.45 0.04 4,025.07 MWD+IFR-AK-CAZ-SC(5)
5/31/2016 2:16:44PM Page 4 COMPASS 5000.1 Build 74
... ......__
•
•
SLB
Definitive Survey Report
Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Survey
Map Map Vertical
MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section
(usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name
8,197.85 64.56 20.57 4,741.68 4,670.77 5,571.11 1,942.80 5,971,186.82 1,491,607.49 0.14 4,081.88 MWD+IFR-AK-CAZ-SC(5)
8,292.11 64.54 20.71 4,782.19 4,711.28 5,650.76 1,972.80 5,971,265.84 1,491,639.08 0.14 4,139.23 MWD+IFR-AK-CAZ-SC(5)
8,386.20 64.47 21.63 4,822.69 4,751.78 5,729.95 2,003.47 5,971,344.40 1,491,671.34 0.89 4,195.87 MWD+IFR-AK-CAZ-SC(5)
8,480.45 64.34 20.61 4,863.40 4,792.49 5,809.24 2,034.10 5,971,423.05 1,491,703.55 0.99 4,252.61 MWD+IFR-AK-CAZ-SC(5)
8,575.29 64.56 20.11 4,904.31 4,833.40 5,889.46 2,063.87 5,971,502.65 1,491,734.92 0.53 4,310.57 MWD+IFR-AK-CAZ-SC(5)
8,669.85 64.50 19.10 4,944.97 4,874.06 5,969.88 2,092.52 5,971,582.47 1,491,765.17 0.97 4,369.22 MWD+IFR-AK-CAZ-SC(5)
8,764.27 64.39 18.30 4,985.71 4,914.80 6,050.57 2,119.83 5,971,662.59 1,491,794.10 0.77 4,428.71 MWD+IFR-AK-CAZ-SC(5)
8,856.36 64.91 17.90 5,025.13 4,954.22 6,129.67 2,145.68 5,971,741.15 1,491,821.53 0.69 4,487.46 MWD+IFR-AK-CAZ-SC(5)
8,951.27 65.00 19.71 5,065.31 4,994.40 6,211.06 2,173.40 5,971,821.96 1,491,850.88 1.73 4,547.40 MWD+IFR-AK-CAZ-SC(5)
9,046.24 65.13 19.44 5,105.35 5,034.44 6,292.20 2,202.25 5,971,902.50 1,491,881.35 0.29 4,606.59 MWD+IFR-AK-CAZ-SC(5)
9,140.37 64.99 20.25 5,145.04 5,074.13 6,372.49 2,231.22 5,971,982.18 1,491,911.93 0.79 4,664.97 MWD+IFR-AK-CAZ-SC(5)
9,234.78 65.09 20.30 5,184.88 5,113.97 6,452.78 2,260.88 5,972,061.85 1,491,943.20 0.12 4,723.05 MWD+IFR-AK-CAZ-SC(5)
9,328.39 65.00 20.39 5,224.38 5,153.47 6,532.35 2,290.39 5,972,140.81 1,491,974.30 0.13 4,780.55 MWD+IFR-AK-CAZ-SC(5)
9,422.26 65.00 20.98 5,264.05 5,193.14 6,611.94 2,320.44 5,972,219.78 1,492,005.94 0.57 4,837.82 MWD+IFR-AK-CAZ-SC(5)
9,516.86 64.84 20.60 5,304.15 5,233.24 6,692.04 2,350.85 5,972,299.24 1,492,037.95 0.40 4,895.39 MWD+IFR-AK-CAZ-SC(5)
9,610.96 64.78 20.77 5,344.20 5,273.29 6,771.71 2,380.93 5,972,378.28 1,492,069.62 0.18 4,952.71 MWD+IFR-AK-CAZ-SC(5)
9,705.84 64.97 20.74 5,384.49 5,313.58 6,852.03 2,411.37 5,972,457.97 1,492,101.67 0.20 5,010.47 MWD+IFR-AK-CAZ-SC(5)
9,799.43 65.04 20.61 5,424.03 5,353.12 6,931.40 2,441.32 5,972,536.71 1,492,133.20 0.15 5,067.58 MWD+IFR-AK-CAZ-SC(5)
9,894.11 65.00 19.59 5,464.02 5,393.11 7,011.99 2,470.82 5,972,616.69 1,492,164.31 0.98 5,126.00 MWD+IFR-AK-CAZ-SC(5)
9,987.56 64.97 18.35 5,503.53 5,432.62 7,092.07 2,498.34 5,972,696.20 1,492,193.44 1.20 5,184.86 MWD+IFR-AK-CAZ-SC(5)
10,081.55 64.93 18.04 5,543.33 5,472.42 7,172.96 2,524.93 5,972,776.53 1,492,221.64 0.30 5,244.86 MWD+IFR-AK-CAZ-SC(5)
10,175.01 64.90 17.10 5,582.95 5,512.04 7,253.66 2,550.48 5,972,856.69 1,492,248.81 0.91 5,305.16 MWD+IFR-AK-CAZ-SC(5)
10,268.88 64.97 15.94 5,622.72 5,551.81 7,335.18 2,574.66 5,972,937.70 1,492,274.62 1.12 5,366.82 MWD+IFR-AK-CAZ-SC(5)
10,362.70 65.07 16.35 5,662.34 5,591.43 7,416.87 2,598.31 5,973,018.90 1,492,299.90 0.41 5,428.87 MWD+IFR-AK-CAZ-SC(5)
10,456.06 65.07 16.19 5,701.70 5,630.79 7,498.14 2,622.03 5,973,099.67 1,492,325.24 0.16 5,490.51 MWD+IFR-AK-CAZ-SC(5)
10,549.71 64.98 15.78 5,741.24 5,670.33 7,579.75 2,645.41 5,973,180.78 1,492,350.26 0.41 5,552.62 MWD+IFR-AK-CAZ-SC(5)
10,643.31 64.52 15.97 5,781.16 5,710.25 7,661.18 2,668.56 5,973,261.73 1,492,375.04 0.52 5,614.66 MWD+IFR-AK-CAZ-SC(5)
10,737.14 64.53 16.40 5,821.52 5,750.61 7,742.53 2,692.17 5,973,342.58 1,492,400.28 0.41 5,676.42 MWD+IFR-AK-CAZ-SC(5)
10,830.73 64.53 17.15 5,861.77 5,790.86 7,823.42 2,716.56 5,973,422.96 1,492,426.29 0.72 5,737.43 MWD+IFR-AK-CAZ-SC(5)
10,924.38 64.57 17.87 5,902.01 5,831.10 7,904.07 2,742.00 5,973,503.07 1,492,453.34 0.70 5,797.73 MWD+IFR-AK-CAZ-SC(5)
11,018.14 64.63 17.21 5,942.23 5,871.32 7,984.82 2,767.53 5,973,583.30 1,492,480.48 0.64 5,858.10 MWD+IFR-AK-CAZ-SC(5)
11,111.87 64.46 16.95 5,982.52 5,911.61 8,065.72 2,792.38 5,973,663.67 1,492,506.96 0.31 5,918.90 MWD+IFR-AK-CAZ-SC(5)
11,205.39 64.55 18.11 6,022.77 5,951.86 8,146.21 2,817.81 5,973,743.63 1,492,533.99 1.12 5,979.07 MWD+IFR-AK-CAZ-SC(5)
11,299.08 64.46 19.73 6,063.10 5,992.19 8,226.21 2,845.23 5,973,823.05 1,492,563.01 1.56 6,037.90 MWD+IFR-AK-CAZ-SC(5)
11,392.62 64.47 20.87 6,103.42 6,032.51 8,305.37 2,874.51 5,973,901.60 1,492,593.88 1.10 6,095.14 MWD+IFR-AK-CAZ-SC(5)
11,486.42 64.56 21.91 6,143.78 6,072.87 8,384.21 2,905.39 5,973,979.80 1,492,626.33 1.01 6,151.36 MWD+IFR-AK-CAZ-SC(5)
11,580.30 64.54 22.36 6,184.13 6,113.22 8,462.73 2,937.33 5,974,057.66 1,492,659.84 0.43 6,206.83 MWD+IFR-AK-CAZ-SC(5)
11,674.33 64.46 22.52 6,224.61 6,153.70 8,541.17 2,969.73 5,974,135.43 1,492,693.80 0.18 6,262.01 MWD+IFR-AK-CAZ-SC(5)
11,768.58 64.46 22.42 6,265.24 6,194.33 8,619.76 3,002.23 5,974,213.34 1,492,727.88 0.10 6,317.27 MWD+IFR-AK-CAZ-SC(5)
11,861.69 64.50 21.80 6,305.36 6,234.45 8,697.60 3,033.86 5,974,290.53 1,492,761.06 0.60 6,372.28 MWD+IFR-AK-CAZ-SC(5)
5/31/2016 2:16:44PM Page 5 COMPASS 5000.1 Build 74
• •
SLB
Definitive Survey Report
Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Survey
Map Map Vertical
MD Inc Azi TVD TVDSS +N/-S +EI-W Northing Easting DLS Section
(usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name
11,955.72 64.46 21.03 6,345.87 6,274.96 8,776.60 3,064.84 5,974,368.88 1,492,793.62 0.74 6,428.60 MWD+IFR-AK-CAZ-SC(5)
12,048.98 64.46 20.63 6,386.08 6,315.17 8,855.25 3,094.76 5,974,446.90 1,492,825.11 0.39 6,485.09 MWD+IFR-AK-CAZ-SC(5)
12,142.16 64.46 19.46 6,426.25 6,355.34 8,934.23 3,123.58 5,974,525.28 1,492,855.51 1.13 6,542.38 MWD+IFR-AK-CAZ-SC(5)
12,236.62 65.01 18.82 6,466.57 6,395.66 9,014.93 3,151.59 5,974,605.40 1,492,885.13 0.85 6,601.57 MWD+IFR-AK-CAZ-SC(5)
12,330.18 64.88 19.55 6,506.19 6,435.28 9,094.98 3,179.44 5,974,684.87 1,492,914.58 0.72 6,660.25 MWD+IFR-AK-CAZ-SC(5)
12,423.70 65.01 19.79 6,545.79 6,474.88 9,174.75 3,207.95 5,974,764.05 1,492,944.69 0.27 6,718.38 MWD+IFR-AK-CAZ-SC(5)
12,517.46 65.01 18.71 6,585.41 6,514.50 9,254.98 3,235.97 5,974,843.69 1,492,974.32 1.04 6,777.15 MWD+IFR-AK-CAZ-SC(5)
12,611.56 64.91 18.21 6,625.23 6,554.32 9,335.85 3,262.97 5,974,923.99 1,493,002.93 0.49 6,836.95 MWD+IFR-AK-CAZ-SC(5)
12,705.00 65.04 17.31 6,664.76 6,593.85 9,416.48 3,288.79 5,975,004.09 1,493,030.37 0.88 6,897.07 MWD+IFR-AK-CAZ-SC(5)
12,798.22 65.01 16.69 6,704.12 6,633.21 9,497.29 3,313.50 5,975,084,38 1,493,056.69 0.60 6,957.85 MWD+IFR-AK-CAZ-SC(5)
12,892.14 65.04 15.62 6,743.78 6,672.87 9,579.07 3,337.19 5,975,165.65 1,493,082.01 1.03 7,019.96 MWD+IFR-AK-CAZ-SC(5)
12,985.83 65.07 15.33 6,783.29 6,712.38 9,660.94 3,359.85 5,975,247.04 1,493,106.32 0.28 7,082.62 MWD+IFR-AK-CAZ-SC(5)
13,079.99 65.01 16.97 6,823.03 6,752.12 9,742.93 3,383.60 5,975,328.54 1,493,131.70 1.58 7,144.89 MWD+IFR-AK-CAZ-SC(5)
13,174.22 65.03 18.03 6,862.82 6,791.91 9,824.39 3,409.28 5,975,409.46 1,493,159.02 1,02 7,205.81 MWD+IFR-AK-CAZ-SC(5)
13,267.06 65.10 17.94 6,901.96 6,831.05 9,904.46 3,435.27 5,975,488.99 1,493,186.61 0.12 7,265.36 MWD+IFR-AK-CAZ-SC(5)
13,360.23 65.21 18.15 6,941.11 6,870.20 9,984.85 3,461.46 5,975,568.83 1,493,214.41 0.24 7,325.10 MWD+IFR-AK-CAZ-SC(5)
13,454.36 66.25 15.89 6,979.80 6,908.89 10,066.90 3,486.57 5,975,650.35 1,493,241.16 2.45 7,386.80 MWD+IFR-AK-CAZ-SC(5)
13,548.12 67.43 13.85 7,016.68 6,945.77 10,150.21 3,508.69 5,975,733.19 1,493,264.94 2.36 7,450.99 MWD+IFR-AK-CAZ-SC(5)
13,641.45 67.37 12.22 7,052.55 6,981.64 10,234.15 3,528.12 5,975,816.72 1,493,286.06 1.61 7,516.96 MWD+IFR-AK-CAZ-SC(5)
13,734.73 67.57 10.04 7,088.30 7,017.39 10,318.68 3,544.75 5,975,900.89 1,493,304.38 2.17 7,584.73 MWD+IFR-AK-CAZ-SC(5)
13,828.66 68.58 7.28 7,123.37 7,052.46 10,404.81 3,557.86 5,975,986.74 1,493,319.22 2.93 7,655.52 MWD+IFR-AK-CAZ-SC(5)
13,922.51 69.16 4.61 7,157.21 7,086.30 10,491.87 3,566.92 5,976,073.59 1,493,330.03 2.72 7,728.98 MWD+IFR-AK-CAZ-SC(5)
14,015.86 71,24 2.49 7,188.83 7,117.92 10,579.53 3,572.35 5,976,161.11 1,493,337.21 3.09 7,804.61 MWD+IFR-AK-CAZ-SC(5)
14,109.74 72.17 1.17 7,218.30 7,147.39 10,668.61 3,575.19 5,976,250.12 1,493,341.85 1.66 7,882.70 MWD+IFR-AK-CAZ-SC(5)
14,203.20 73.56 359.42 7,245.84 7,174.93 10,757.92 3,575.65 5,976,339.39 1,493,344.09 2.33 7,962.06 MWD+IFR-AK-CAZ-SC(5)
14,297.60 74.82 357.41 7,271.56 7,200.65 10,848.70 3,573.13 5,976,430.20 1,493,343.40 2.45 8,044.10 MWD+IFR-AK-CAZ-SC(5)
14,391.41 76.65 353.89 7,294.68 7,223.77 10,939.34 3,566.22 5,976,520.95 1,493,338.32 4.13 8,127.99 MWD+IFR-AK-CAZ-SC(5)
14,485.80 79.80 349.28 7,313.95 7,243.04 11,030.70 3,552.69 5,976,612.56 1,493,326.62 5.83 8,215.54 MWD+IFR-AK-CAZ-SC(5)
14,579.41 80.82 347.43 7,329.71 7,258.80 11,121.07 3,534.06 5,976,703.28 1,493,309.82 2.23 8,304.52 MWD+IFR-AK-CAZ-SC(5)
14,638.89 80.89 346.75 7,339.16 7,268.25 11,178.31 3,520.94 5,976,760.77 1,493,297.85 1.13 8,361.48 MWD+IFR-AK-CAZ-SC(5)
14,694.60 82.26 346.19 7,347.33 7,276.42 11,231.89 3,508.05 5,976,814.59 1,493,286.04 2.65 8,415.07
7-5/8"X 9-7/8"by 11"
14,705.18 82.52 346.09 7,348 73 7,277.82 11,242.07 3,505.54 5,976,824.82 1,493,283.73 2.65 8,425.28 INC+TREND(6)
14,800.56 82.63 345.15 7,361.05 7,290.14 11,333.69 3,482.05 5,976,916.88 1,493,262.09 0.98 8,517.57 MWD+IFR-AK-CAZ-SC(7)
14,896.02 82.73 346.07 7,373.22 7,302.31 11,425.40 3,458.52 5,977,009.04 1,493,240.41 0.96 8,609.97 MWD+IFR-AK-CAZ-SC(7)
14,903.65 83.03 345.72 7,374.16 7,303.25 11,432.74 3,456.67 5,977,016.42 1,493.238.71 6.05 8,617.35 .. i.,,.,,. r-
4-1/2"x 6-3/4"
.14.991 28 86.53 341.72 7,382.13 7,311.22 11,516.48 3,432.21 5,977,100.62 1,493,215.94 6.05 8,703.07 MWD+IFR-AK-CAZ-SC(7)
15,086.72 87.45 341.68 7,387.14 7,316.23 11,606.96 3,402.28 5,977,191.68 1,493,187.84 0.96 8,797.28 MWD+IFR-AK-CAZ-SC(7)
15,182.10 89.13 339.29 7,389.99 7,319.08 11,696.82 3,370.44 5,977,282.15 1,493,157.81 3.06 8,891.79 MWD+IFR-AK-CAZ-SC(7)
5/31/2016 2:16:44PM Page 6 COMPASS 5000.1 Build 74
• •
SLB
Definitive Survey Report
Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Survey
Map Map Vertical
MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section
(usft) (°) (0) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name
15,277.63 91.92 337.35 7,389.12 7.318.21 11,785.57 3,335.15 5,977,371.59 1,493,124.32 3.56 8,986.89 MWD+IFR-AK-CAZ-SC(7)
15,372.06 91.30 336.64 7,386.46 7,315.55 11,872.46 3,298.27 5,977,459.19 1,493,089.18 1.00 9,081.05 MWD+IFR-AK-CAZ-SC(7)
15,467.88 90.64 336.36 7,384.84 7,313.93 11,960.32 3,260.06 5,977,547.79 1,493,052.76 0.75 9,176.68 MWD+IFR-AK-CAZ-SC(7)
15,562.83 90.19 334.82 7,384.15 7,313.24 12,046.77 3,220.83 5,977,635.02 1,493,015.27 1.69 9,271.53 MWD+IFR-AK-CAZ-SC(7)
15,658.54 90.20 333.60 7,383.83 7,312.92 12,132.95 3,179.19 5,977,722.00 1,492,975.37 1.27 9,367.22 MWD+IFR-AK-CAZ-SC(7)
15,754.40 90.47 332.23 7,383.27 7,312.36 12,218.29 3,135.54 5,977,808.20 1,492,933.45 1.46 9,463.07 MWD+IFR-AK-CAZ-SC(7)
15,849.11 90.96 331.16 7,382.08 7,311.17 12,301.67 3,090.64 5,977,892.46 1,492,890.24 1.24 9,557.75 MWD+IFR-AK-CAZ-SC(7)
15,944.62 91.03 330.32 7,380.43 7,309.52 12,384.98 3,043.96 5,977,976.68 1,492,845.25 0.88 9,653.17 MWD+IFR-AK-CAZ-SC(7)
16,041.42 90.17 330.23 7,379.41 7,308.50 12,469.04 2,995.97 5,978,061.68 1,492,798.96 0.89 9,749.85 MWD+IFR-AK-CAZ-SC(7)
16,136.33 89.30 329.43 7,379.85 7,308.94 12,551.09 2,948.27 5,978,144.67 1,492,752.92 1.25 9,844.61 MWD+IFR-AK-CAZ-SC(7)
16,231.27 88.79 327.31 7,381.43 7,310.52 12,631.91 2,898.49 5,978,226.47 1,492,704.78 2.30 9,939.23 MWD+IFR-AK-CAZ-SC(7)
16,326.82 88.73 327.14 7,383.50 7,312.59 12,712.23 2,846.78 5,978,307.80 1,492,654.69 0.19 10,034.27 MWD+IFR-AK-CAZ-SC(7)
16,421.37 87.99 327.13 7,386.21 7,315.30 12,791.61 2,795.49 5,978,388.20 1,492,605.01 0.78 10,128.28 MWD+IFR-AK-CAZ-SC(7)
16,516.28 88.50 327.49 7,389.11 7,318.20 12,871.45 2,744.26 5,978,469.04 1,492,555.40 0.66 10,222.68 MWD+IFR-AK-CAZ-SC(7)
16,612.09 88.10 327.65 7,391.96 7,321.05 12,952.28 2,692.90 5,978,550.88 1,492,505.68 0.45 10,318.02 MWD+IFR-AK-CAZ-SC(7)
16,707.39 88.52 326.90 7,394.77 7,323.86 13,032.42 2,641.40 5,978,632.04 1,492,455.81 0.90 10,412.80 MWD+IFR-AK-CAZ-SC(7)
16,802.85 88.78 326.89 7,397.02 7,326.11 13,112.36 2,589.28 5,978,713.00 1,492,405.30 0.27 10,507.69 MWD+IFR-AK-CAZ-SC(7)
16,897.48 90.07 326.52 7,397.97 7,327.06 13,191.46 2,537.33 5,978,793.11 1,492,354.96 1.42 10,601.75 MWD+IFR-AK-CAZ-SC(7)
16,993.13 90.41 326.20 7,397.57 7,326.66 13,271.09 2,484.35 5,978,873.79 1,492,303.59 0.49 10,696.75 MWD+IFR-AK-CAZ-SC(7)
17,088.44 90.37 327.56 7,396.92 7,326.01 13,350.91 2,432.27 5,978,954.63 1,492,253.13 1.43 10,791.52 MWD+IFR-AK-CAZ-SC(7)
17,183.65 90.67 329.81 7,396.05 7,325.14 13,432.24 2,382.79 5,979,036.94 1,492,205.30 2.38 10,886.45 MWD+IFR-AK-CAZ-SC(7)
17,279.11 91,39 331.60 7,394.34 7,323.43 13,515.47 2,336.09 5,979,121.09 1,492,160.29 2.02 10,981,81 MWD+IFR-AK-CAZ-SC(7)
17,374.41 92.69 333.20 7,390.94 7,320.03 13,599.87 2,291.97 5,979,206.35 1,492,117.87 2.16 11,077.04 MWD+IFR-AK-CAZ-SC(7)
17,469.90 92.38 334.38 7,386.72 7,315.81 13,685.46 2,249.84 5,979,292.76 1,492,077.47 1.28 11,172.43 MWD+IFR-AK-CAZ-SC(7)
17,565.11 90.27 335.38 7,384.52 7,313.61 13,771.63 2,209.44 5,979,379.72 1,492,038.81 2.45 11,267.55 MWD+IFR-AK-CAZ-SC(7)
17,660.35 91.16 336.01 7,383.33 7,312.42 13,858.42 2,170.24 5,979,467.27 1,492,001.37 1.14 11,362.68 MWD+IFR-AK-CAZ-SC(7)
17,756.34 91.86 337.23 7,380.80 7,309.89 13,946.50 2,132.16 5,979,556.09 1,491,965.07 1.46 11,458.44 MWD+IFR-AK-CAZ-SC(7)
17,851.20 89.07 337.91 7,380.03 7,309.12 14,034.17 2,095.97 5,979,644.47 1,491,930.65 3,03 11,552.99 MWD+IFR-AK-CAZ-SC(7)
17,946.61 89.22 337.58 7,381.45 7,310.54 14,122.46 2,059.84 5,979,733.46 1,491,896.31 0.38 11,648.06 MWD+IFR-AK-CAZ-SC(7)
18,042.17 90.76 336.40 7,381.47 7,310.56 14,210.42 2,022.49 5,979,822.14 1,491,860.73 2.03 11,743.38 MWD+IFR-AK-CAZ-SC(7)
18,137.04 91.66 335.78 7,379.47 7,308.56 14,297.12 1,984.05 5,979,909.59 1,491,824.04 1.15 11,838.09 MWD+IFR-AK-CAZ-SC(7)
18,233.10 91.08 334.89 7,377.17 7,306.26 14,384.39 1,943.97 5,979,997.65 1,491,785.73 1.11 11,934.04 MWD+IFR-AK-CAZ-SC(7)
18,328.85 91.05 333.50 7,375.39 7,304.48 14,470.58 1,902.30 5,980,084.64 1,491,745.80 1.45 12,029.75 MWD+IFR-AK-CAZ-SC(7)
18,422.92 91.44 332.28 7,373.35 7,302.44 14,554.29 1,859.44 5,980,169.19 1,491,704.64 1.36 12,123.80 MWD+IFR-AK-CAZ-SC(7)
18,518.07 91.67 332.85 7,370.76 7,299.85 14,638.71 1,815.62 5,980,254.47 1,491,662.53 0.65 12,218.91 MWD+IFR-AK-CAZ-SC(7)
18,613.24 92.23 332.52 7,367.53 7,296.62 14,723.22 1,771.97 5,980,339.83 1,491,620.59 0.68 12,314.02 MWD+IFR-AK-CAZ-SC(7)
18,708.23 92.05 332.66 7,363.98 7,293.07 14,807.48 1,728.28 5,980,424.95 1,491,578.60 0.24 12,408.94 MWD+IFR-AK-CAZ-SC(7)
18,803.79 92.07 332.88 7,360.54 7,289.63 14,892.40 1,684.58 5,980,510.72 1,491,536.62 0.23 12,504.44 MWD+IFR-AK-CAZ-SC(7)
18,898.92 90.28 333.20 7,358.59 7,287.68 14,977.17 1,641.46 5,980,596.34 1,491,495.21 1.91 12,599.55 MWD+IFR-AK-CAZ-SC(7)
18,993.36 90.51 333.47 7,357.94 7,287.03 15,061.56 1,599.08 5,980,681.56 1,491,454.54 0.38 12,693.98 MWD+IFR-AK-CAZ-SC(7)
5/31/2016 2:16:44PM Page 7 COMPASS 5000.1 Build 74
•
0 ID
SLB
Definitive Survey Report
Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: CD5-02 North Reference: True
Wellbore: CD5-02A Survey Calculation Method: Minimum Curvature
Design: CD5-02A Database: EDM Production
Survey
Map Map Vertical
MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section
(usft) (0) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name
19,088.29 90.34 334.21 7,357.24 7,286.33 15,146.77 1.55723 5,980,767.58 1,491,414.41 0.80 12,788.90 MWD+IFR-AK-CAZ-SC(7)
19,184.57 89.99 335.03 7,356.96 7,286.05 15,233.75 1,515.96 5,980,855.37 1,491,374.91 0.93 12,885.14 MWD+IFR-AK-CAZ-SC(7)
19,280.54 90.28 334.36 7,356.74 7,285.83 15,320.51 1,474.94 5,980,942.93 1,491,335.64 0.76 12,981.07 MWD+IFR-AK-CAZ-SC(7)
19,375.26 89.84 335.10 7,356.64 7,285.73 15,406.17 1,434.51 5,981,029.37 1,491,296.94 0.91 13,075.74 MWD+IFR-AK-CAZ-SC(7)
19,470.92 90.42 335.06 7,356.42 7,285.51 15,492.92 1,394.20 5,981,116.91 1,491,258.38 0.61 13,171.34 MWD+IFR-AK-CAZ-SC(7)
19,566.20 89.92 333.67 7,356.14 7,285.23 15,578.82 1,352.98 5,981,203.62 1,491,218.90 1.55 13,266.59 MWD+IFR-AK-CAZ-SC(7)
19,661.88 89.63 331.81 7,356.51 7,285.60 15,663.87 1,309.16 5,981,289.52 1,491,176.80 1.97 13,362.26 MWD+IFR-AK-CAZ-SC(7)
19,756.90 90.72 331.55 7,356.22 7,285.31 15,747.51 1,264.08 5,981,374.05 1,491,133.42 1.18 13,457.26 MWD+IFR-AK-CAZ-SC(7)
19,851.65 91.31 331.43 7,354.54 7,283.63 15,830.76 1,218.86 5,981,458.18 1,491,089.88 0.64 13,551.96 MWD+IFR-AK-CAZ-SC(7)
19,947.51 91.22 330.77 7,352.43 7,281.52 15,914.66 1,172.55 5,981,542.99 1,491,045.27 0.69 13,647.74 MWD+IFR-AK-CAZ-SC(7)
20,043.00 91.63 330.48 7,350.05 7,279.14 15,997.85 1,125.72 5,981,627.10 1,491,000.13 0.53 13,743.12 MWD+IFR-AK-CAZ-SC(7)
20,137.95 90.34 332.24 7,348.42 7,277.51 16,081.16 1,080.22 5,981,711.30 1,490,956.31 2.30 13,838.01 MWD+IFR-AK-CAZ-SC(7)
20,233.02 89.08 332.63 7,348.90 7,277.99 16,165.44 1,036.23 5,981,796.44 1,490,914.03 1.39 13,933.07 MWD+IFR-AK-CAZ-SC(7)
20,328.02 89.18 332.16 7,350.34 7,279.43 16,249.62 992.22 5,981,881.48 1,490,871.71 0.51 14,028.06 MWD+IFR-AK-CAZ-SC(7)
20,422.84 88.72 334.98 7,352.08 7,281.17 16,334.50 950.02 5,981,967.19 1,490,831.24 3.01 14,122.85 MWD+IFR-AK-CAZ-SC(7)
20,518.71 88.83 333.79 7,354.13 7,283.22 16,420.93 908.59 5,982,054.42 1,490,791.55 1.25 14,218.66 MWD+IFR-AK-CAZ-SC(7)
20,613.26 88.99 333.90 7,355.93 7,285.02 16,505.78 866.92 5,982,140.09 1,490,751.59 0.21 14,313.19 MWD+IFR-AK-CAZ-SC(7)
20,709.19 89.76 332.15 7,356.98 7,286.07 16,591.27 823.41 5,982,226.42 1,490,709.81 1.99 14,409.11 MWD+IFR-AK-CAZ-SC(7)
20,804.26 90.21 331.98 7,357.00 7,286.09 16,675.26 778.87 5,982,311.29 1,490,666.98 0.51 14,504.16 MWD+IFR-AK-CAZ-SC(7)
20,900.16 89.91 330.48 7,356.90 7,285.99 16,759.32 732.71 5,982,396.25 1,490,622.52 1.60 14,600.02 MWD+IFR-AK-CAZ-SC(7)
20,994.46 90.78 328.88 7,356.33 7,285.42 16,840.71 685.11 5,982,478.58 1,490,576.57 1.93 14,694.15 MWD+IFR-AK-CAZ-SC(7)
21,089.89 89.43 330.11 7,356.16 7,285.25 16,922.93 636.67 5,982,561.75 1,490,529.80 1.91 14,789.40 MWD+IFR-AK-CAZ-SC(7)
21,185.21 92.10 330.80 7,354.89 7,283.98 17,005.84 589.68 5,982,645.58 1,490,484.48 2.89 14,884.61 MWD+IFR-AK-CAZ-SC(7)
21,281.17 90.90 331.37 7,352.37 7,281.46 17,089.81 543.30 5,982,730.46 1,490,439.80 1.38 14,980.48 MWD+IFR-AK-CAZ-SC(7)
21,376.71 91.02 331.70 7,350.77 7,279.86 17,173.79 497.77 5,982,815.32 1,490,395.97 0.37 15,075.97 MWD+IFR-AK-CAZ-SC(7)
21,472.20 91.19 330.96 7,348.93 7,278.02 17,257.55 451.96 5,982,899.99 1,490,351.86 0.79 15,171.41 MWD+IFR-AK-CAZ-SC(7)
21,567.37 91.35 331.40 7,346.82 7,275.91 17,340.91 406.10 5,982,984.25 1,490,307.68 0.49 15,266.50 MWD+IFR-AK-CAZ-SC(7)
21,662.92 90.30 333.19 7,345.45 7,274.54 17,425.50 361.68 5,983,069.70 1,490,264.98 2.17 15,362.03 MWD+IFR-AK-CAZ-SC(7)
21,759.64 89.49 333.11 7,345.62 7,274.71 17,511.79 318.00 5,983,156.85 1,490,223.04 0.84 15,458.75 MWD+IFR-AK-CAZ-SC(7)
21,854.74 90.32 333.03 7,345.78 7,274.87 17,596.57 274.93 5,983,242.47 1,490,181.69 0.88 15,553.85 MWD+IFR-AK-CAZ-SC(7)
21,948.62 89.85 334.78 7,345.64 7,274.73 17,680.88 233.63 5,983,327.59 1,490,142.10 1.93 15,647.71 MWD+IFR-AK-CAZ-SC(7)
22,106.00 89.85 334.78 7,346.05 7,275.14 17,823.26 166.58 5,983,471.27 1,490,077.92 0.00 15,805.02 PROJECTED to TD
0.0446401
5/31/2016 2:16:44PM Page 8 COMPASS 5000.1 Build 74
i r
Final Definitive Survey
Verified and Signed-off
All targets and/or well position objectives have been achieved.
Yes ❑ No
1 have checked to the best of my ability that the following data is correct:
El Surface Coordinates
Declination & Convergence
GRS Survey Corrections Digitally signed by Brij
El Survey Tool Codes
Hall-Potnis
•c1 Date:2016.05.31
SLB DE: 14:20:22-08'00'
William Earhart Digitally signed by William Earhart
Client Representative: Date:2016.05.31 162058-08'00
Date:
OF T�
i
,v, THE STATE Alaska Oil and Gas
f ® Conservation Commission
741:6 oALASKA.
- .F 333 West Seventh Avenue
GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
ALAS
www.aogcc.alaska.gov
Chip Alvord
Drilling Manager
ConocoPhillips Alaska, Inc.
P.O. Box 100360
Anchorage, AK 99510-0360
Re: Colville River Field, Alpine Oil Pool, CRU CD5-02A
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 216-068
Surface Location: 298' FNL, 2459', FEL, Sec. 18, T11N, R4E, UM
Bottomhole Location: 2877' FNL, 2620' FEL, Sec. 30, T12N, R4E, UM
Dear Mr. Alvord:
Enclosed is the approved application for permit to redrill the above referenced service well.
This permit to drill does not exempt you from obtaining additional permits or an approval
required by law from other governmental agencies and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
AOGCC reserves the right to withdraw the permit in the event it was erroneously issued.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well
logs run must be submitted to the AOGCC within 90 days after completion, suspension or
abandonment of this well.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to
comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result
in the revocation or suspension of the permit.
Sincerely,
.!/6
Cathy P. oerster
Chair
DATED this S day of May, 2016.
RECEIVED
STATE OF ALASKA
AIA OIL AND GAS CONSERVATION COMMON MAY 0 4 2016
PERMIT TO DRILL
20 AAC 25.005
1 a.Type of Work: 1 b.Proposed Well Class: Exploratory Gas r
y p p ry- ❑ Service- WAG ❑� Service-Disp ❑ 1 c.Specify if welt is propose for:
Drill ❑ Lateral ❑ Stratigraphic Test ❑ Development-Oil ❑ Service- Winj ❑ Single Zone ❑., Coalbed Gas ❑ Gas Hydrates ❑
Redrill❑., 'Reentry❑ Exploratory-Oil ❑ Development-Gas ❑ Service-Supply ❑ Multiple Zone Ll' Geothermal ❑ Shale Gas ❑
2.Operator Name: 5. Bond: Blanket Q ' Single Well ❑ 11.Well Name and Number:
ConocoPhillips Alaska, Inc.- Bond No. 59-52-180 • CRU CD5-02A `
3.Address: 6.Proposed Depth: 12.Field/Pool(s):
P.O.Box 100360 Anchorage,AK 99510-0360 MD: 22901. ND: ` 7316 Colville River Unit `
4a. Location of Well(Governmental Section): 7.Property Designation(Lease Number): Alpine Pool
Surface: 298'FNL,2459' FEL,Sec.18,T11 N,R4E,UM • ASRC-NPRA2,ADL388466,NPRA4
Top of Productive Horizon: 8.Land Use Permit: 13.Approximate Spud Date:
4965'FNL,4176'FEL,Sec.32,T12N,R4E,UM 932128,300634 5/5/2016
Total Depth: 9.Acres in Property: 14.Distance to Nearest Property:
2877'FNL,2620'FEL,Sec.30,Tl 2N,R4E,UM • 8,838.21,1,733.05,15912 2,236 to ASRC-NPRA1
4b.Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL(ft): . 70.4 15.Distance to Nearest Well Open
Surface:x- 349520 y- 5965910 ZQne- 4 GL Elevation above MSL(ft): , 34.1 to Same Pool: 1,559 to CD5-03
16.Deviated wells: Kickoff depth: 11S9 0 feet '41 17.Maximum Potential Pressures in psig(see 20 AAC 25.035)
Maximum Hole Angle: 90 degrees • Downhole: )5 3zs0Tti Surface: 2319-
18.Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity,c.f.or sacks
Hole Casing Weight Grade Coupling Length MD TVD MD ND (including stage data)
42" 20" 94 H-40 Welded 80 36 36 115 115 10yds
13-1/2" 10-3/4" 45.5 L-80 H-563/BTC 2388 36 36 2424 2189 921 sx 11.0 ppg,285 sx 15.8 ppg G
9-7/8 x 11" 7-5/8" 29.7 L-80 H-563/BTC 14584 36 36 14620 7340 341 sx 15.8 ppg G;249 sx 15.8 ppg G
6-3/4" OH Openhole barefoot completion
19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-Entry Operations)
Total Depth MD(ft): Total Depth ND(ft): Plugs(measured): Effect.Depth MD(ft): Effect.Depth ND(ft): Junk(measured):
2224-2749 2224 2060
Casing Length Size Cement Volume MD TVD
Conductor/Structural 79.00 20" 10yds 115 115
Surface 2,388.00 10-3/4" 921sx 11.0 ppg,285sx 15.8 ppg G 2424 2189
Intermediate
Production
Liner
Perforation Depth MD(ft): Perforation Depth ND(ft):
20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program Q Time v.Depth Plot ❑ Shallow Hazard Analysis❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program ❑ 20 AAC 25.0505/ requirements❑
21. Verbal Approval: Commission Representative: Date -" j \ "t... 5/3/2016
22. I hereby certify that the foregoing is true and the procedure approved herein will not William Earhart 265-1077
be deviated from without prior written approval. Contact
W it liam.C.EarhartaCO P.com
Email
Printed Name Chip Alvord Title Drilling Manager
Signature /r' - Q 4 Phone 265-6120 Date `> f; '2-') I L
Commission Use Only
Permit to Drill API Number: Permit Approval See cover letter for other
Number: a 1(0,-• OG?) 50- 10 3^01,0737. -01.-0 Date: S"S^ \L..p requirements. /
Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained in shales: L�
Other: 3 o p I-e51 fp 35-0 C, p S/cl Samples req'd: Yes❑ No 14 Mud log req'd:Yes❑ No['
4 n n v 1 cc r-/3 rC v i- ?Ltk- f fo5-Dc2p s H2S measures: Yes[ti No,❑/ Directional svy req'd:Yes[,]/No❑
4 W 1 a v C r 1 5 f ra N / -J 11 a w Spacirt'exception req'd: Yes 111 No Li Inclination-only svy req'd:Yes❑ 1Vo AI
P a C,4--fr--it'd be: pi a Cl'& A' e)o/Art Q a IjG v:! top p fY *F(2C�.- C Post initial injection MIT req'd:Yes rLc I No CI12tvr`lw o f 50), )-c w/ A-067ee rfyl,/�Ytd 2S 142C6)
r i D/ 17, rvvzvzt v1q O✓� -j� I t -Ft 0-1.-,l
APPROVED BY
Approved by: COMMISSIONER( THE
A/C COMMISSIIO`N/ Date: ..5 -S-
V 1- 57 5//L. .1)K3SIM 1 I° /4`z 17"" ``.b Submit Form and
Form 10-401(Revised 11/2015) 0 Rile'NiAtonths from the date of approval(20 AAC 25.005(g)) Attachments in Duplicate
•
ConocoPhillips Alaska,Inc.
Post Office Box 100360
Anchorage,Alaska 99510-0360 ConocoPhillips
Telephone 907-276-1215
May 3,2016
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue,Suite 100
Anchorage,Alaska 99501
Re: Application for Permit to Drill CRU CD5-02A V
Dear Sir or Madam:
ConocoPhillipp Alaska,Inc.hereby applies for a Permit to Drill for an onshore production well from the CD5 drilling pad with
rig Doyon 19. It is intended to commence sidetrack operations for this well is 5/5/2016.
CRU CD5-02A is planned to be an Alpine A sand WAG injection well.The well will sidetrack out of the existing 10-3/4"
surface casing of parent wellbore CD5-02.Following failed primary and remedial cement jocbs on CD5-02 was plugged back
and a cement kick off plug was up into the surface casing shoe.The sidetrack intermediate section will be drilled with 9-7/8"x
11"underreamer BHA and Managed Pressure Drilling technology.This hole will be subsequently cased with a 7-5/8"casing
string to surface and cemented to 500'above the uppermost hydrocarbon bearing interval and 250'above the planned packer
setting depth.The suface by intermediate casing annulus will then be evaluated for future annular disposal by performing a
leak-off test.
The 6-3/4"production section will then be horizontally drilled and completed as an Alpine A sand WAG injector.No
production liner is planned and the lateral will be left with a barefoot completion.A 4-1/2"completion string with production
packer will be run and the packer set approximately 600' MD above the casing shoe to allow slickline access to nipple directly
below the packer.
Please find attached the information required by 20 AAC 25.005(a)and(c) for your review. Pertinent information
attached to this application includes the following:
1. Form 10-401 Application For Permit to Drill per 20 AAC 25.005(a)
2. A proposed drilling program
3. A proposed completion diagram
4. A drilling fluids program summary
5. Pressure information as required by 20 AAC 25.035(d)(2)
6. Directional drilling/collision avoidance information as required by 20 AAC 25.050(b)
Information pertinent to the application that is presently on file at the AOGCC:
1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20
AAC 25.035(a)and(b).
2. A description of the drilling fluids handling system.
3. Diagram of riser set up.
If you have any questions or require further information,please contact Will Earhart at 265-1077
(William.C.Earhart(a ConocoPhillips.com)or Chip Alvord at 265-6120.
Sincerely, cc:
CD5-02 Well File/Ann Haggerty-Sherrod ATO 1530
Johnson Njoku ATO 1720
Chip Alvord ATO 1570
Will Earhart Jason McLennan ATO 1790
Drilling Engineer Lanston Chin Kuukpik Corp
• •
Application for Permit to Drill,Well CRU CD5-02
Saved:3-May-16
CD5-02A
Application for Permit to Drill Document
conocoPhifips
Table of Contents
1. Well Name (Requirements of 20 AAC 25.005(f)) 3
2. Location Summary(Requirements of 20 AAC 25.005(C)(2)) 3
Requirements of 20 AAC 25.050(b) 3
3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005(C)(3)) 3
4. Drilling Hazards Information (Requirements of 20 AAC 25.005 (c)(4)) 4
5. Procedure for Conducting Formation Integrity Tests (Requirements of 20 AAC 25.005 (c)(5))5
6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) 5
7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) 5
8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8)) 6
9. Abnormally Pressured Formation Information (Requirements of 20AAC 25.005 (c)(9)) 7
10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10)) 7
11. Seabed Condition Analysis (Requirements of 20 AAC 25.005 (c)(11)) 7
12. Evidence of Bonding(Requirements of 20 AAC 25.005 (c)(12)) 7
13. Proposed Drilling Program (Requirements of 20 AAC 25.005 (c)(13)) 8
14. Discussion of Mud and Cuttings Disposal and Annular Disposal 9
(Requirements of 20 AAC 25.005 (c)(14)) 9
15. Attachments 10
Attachment 1 Cement Summary 101
CD5-02 APD
Page 1 of 15
Printed:3-May-16
• •
Application for Permit to Drill,Well CRU CD5-02
Saved:3-May-16
Attachment 2 Drilling Hazards Summary 102
Attachment 3 Completion Schematic 13
Attachment 4 Directional Plan 14
CD5-02 APD
Page 2 of 15
Printed:3-May-16
• •
Application for Permit to Drill,Well CRU CD5-02
Saved:3-May-16
1. Well Name (Requirements of 20AAC25.005(f))
The well for which this application is submitted will be designated as CRU CD5-02A.
2. Location Summary(Requirements of 20 AAC 25.005(c)(2))
This well is planned for:
Location at Surface 298' FNL,2459' FEL,Sec. 18,T11N, R4E, UM
NAD 1927 RKB Elevation 70.4'AMSL
Northings: 5,965,910
Eastings:349,520 Pad Elevation 34.1'AMSL
Top of Productive Horizon(Heel) 4965' FNL,4176' FEL,Sec.32,T12N, R4E, UM
NAD 1927 Measured Depth, RKB: 14,620'
Northings:5,977,011 Total Vertical Depth, RKB: 7,340'
Eastings:353,263 Total Vertical Depth,SS: 7,269'
Total Depth (Toe) 2877' FNL,2620' FEL,Sec.30,T12N, R4E, UM
NAD 1927 Measured Depth, RKB: 22,901,
Northings: 5,984,451 Total Vertical Depth, RKB: 7,316'
Eastings: 349,660 Total Vertical Depth,SS: 7,245'
Requirements of 20 AAC 25.050(b)
Please see Attachment 4: Directional Plan
The Applicant is the only affected owner.
3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005(c)(3))
Please reference BOP and diverter schematics on file for Doyon 19.
CD5-02 APD
Page 3 of 15
Printed:3-May-16
Application for Permit to Drill,Well CRU CD5-02
Saved:3-May-16
4. Drilling Hazards Information (Requirements of 20 AAC 25.005(c)(4))
The following presents data used for calculation of anticipated surface pressure(ASP)during drilling of this well:
Casing Size Csg Setting Depth Fracture Pore pressure ASP Drilling
(in) MD/TVD(ft) Gradient(ppg) (psi) (psi)
20 115/115 10.9 50 54
10.75 2,424/2,189 14.5 1011 ') 1432
7.625 14,620'/7,340 12.5 U 32�6 2316
n/a 22,901'/7,316 12.5 3050 N/A
PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE(ASP)
ASP is determined as the lesser of 1)surface pressure at breakdown of the formation casing seat with a gas
gradient to the surface, or 2)formation pore pressure at the next casing point less a gas gradient to the surface as
follows:
1) ASP=[(FG x 0.052)-0.1]*D
Where: ASP=Anticipated surface pressure in psi
FG=Fracture gradient at the casing seat in lb/gal
0.052=Conversion from lb./gal to psi/ft
0.1=Gas gradient in psi/ft
D=True vertical depth of casing seat in ft RKB
OR
2) ASP=FPP-(0.1 x D)
Where: FPP= Formation Pore Pressure at the next casing point
FPP=0.4525 x TVD
1. ASP CALCULATIONS
1. Drilling below 20"conductor(surface casing already set)
ASP=[(FG x 0.052)-0.1] D
=[(10.9 x 0.052)-0.1]x 115'=54 psi
OR
ASP= FPP-(0.1 x D)
=1011-(0.1x2189')=792 psi
2. Drilling below 10-3/4"surface casing
ASP=[(FG x 0.052)-0.1] D
=[(14.5 x 0.052)-0.1]x 2189' =1432 psi
OR
ASP= FPP-(0.1 x D)
=3250-(0.1 x 7340')=2516 psi
3. Drilling below 7-5/8"intermediate casing
ASP= [(FG x 0.052)-0.1] D
=[(12.5 x 0.052)-0.1]x 7340' =4037 psi
OR
ASP=FPP-(0.1 x D)
=3050-(0.1 x 7340')=2316 psi
CD5-02 APD
Page 4 of 15
Printed:3-May-16
S
Application for Permit to Drill,Well CRU CD5-02
Saved:3-May-16
(B)data on potential gas zones;
The well bore is not expected to penetrate any gas zones.
(C)data concerning potential causes of hole problems such as abnormally geo-pressured strata,lost circulation
zones,and zones that have a propensity for differential sticking;
Please see Attachment 2-Drilling Hazards Summary
5. Procedure for Conducting Formation Integrity Tests (Requirements of 20AAC 25.005(c)(5))
Drill out surface casing shoe and perform LOT test or FIT in accordance with the Alpine LOT/FIT procedure that
ConocoPhillips Alaska has on file with the Commission.
6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6))
Casing and Cementing Program
Csg/Tbg Hole Weight Grade Conn. Length Top MD/TVD Btm MD/TVD Cement Program
OD(in) Size(in) (lb/ft) (ft) (ft) (ft)
20 42 94 H-40 Welded 80 36/36 115/115 Previously Installed
HYD Previously Installed
10-3/4 13.5 45.5 L-80 563 X 2,388 36/36 2,424/2,189 Cemented to Surface with
BTCM 921 sx DeepCRETE Lead 11.0 ppg,
285 sx Class"G"Tail Slurry 15.8 ppg
9.875x1 HYD 563 14,620/ Planned
7 5/8 1 29.7 L 80 X BTCM 14,584 36/36 7 340 Stage 1: 341 sx Class G at 15.8 ppg
Stage 2: 249 sx Class G at 15.8 ppg
N/A 6.75 Open hole barefoot completion
7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7))
Not applicable.Well will sidetrack below existing CD5-02 surface casing set at 2,424' MD/2,189'ND.
CD5-02 APD
Page 5 of 15
Printed:3-May-16
110 •
Application for Permit to Drill,Well CRU CD5-02
Saved:3-May-16
8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8))
Intermediate Production
Hole Size in. 9.875 x 11 6.75
Casing Size in. 7.625 n/a
Density PPG 9.6—11.1 9.0
PV cP 14 11-15
YP lb./100 ft2 11-16 13-16
Funnel Viscosity s/qt. 50-60 40-50
Initial Gels lb./100 ft2 10 6
10 Minute Gels lb./100 ft2 15 8
API Fluid Loss cc/30 min. 5.0-10.0 4.0
HPHT Fluid Loss cc/30 min. 8.0—12.0 <10.0
pH 9.5-10.0 9.0-9.5
Intermediate#1:
Fresh water gel/polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid
annular velocity. There is a slight potential for lost circulation, particularly after the reservoir is penetrated.
Maintain mud weight at or below 9.6 ppg and be prepared to add loss circulation material. Good filter cake quality,
hole cleaning and maintenance of low drill solids(by diluting as required)will all be important in maintaining
wellbore stability.The mud will be weighted up to 11.1 before pulling out of the hole.
Note: Managed Pressure Drilling(MPD)will be utilized for added backpressure to mitigate shale instability and
cycling.
Production Hole:
The horizontal production interval will be drilled with a water-based mud drill-in fluid(Flo-Pro NT)weighted to 9.0
ppg with calcium carbonate and KCI.
Diagram of Doyon 19 Mud System on file.
Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033.
CD5-02 APD
Page 6 of 15
Printed:3-May-16
Application for Permit to Drill,Well CRU CD5-02
Saved:3-May-16
9. Abnormally Pressured Formation Information (Requirements of 20AAC 25.005(c)(9))
N/A-Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10))
N/A-Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis (Requirements of 20AAC 25.005(c)(11))
N/A-Application is not for an offshore well.
12. Evidence of Bonding(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
CD5-02 APD
Page 7 of 15
Printed:3-May-16
• •
Application for Permit to Drill,Well CRU CD5-02
Saved:3-May-16
13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13))
The proposed drilling program is listed below. Please refer to Attachment 3:Completion Schematic.
Continuation of current PTD 216-029 through setting of 17.0ppg cement kick-off Plug.Transfer to CD5-02A PTD at
testing of BOPE.
1. Test BOPE to 250 psi low/3500 psi high. Provide AOGCC 24hr notice prior to testing.
2. Pick up and run in hole with 9-7/8"x 11"rotary steerable drilling BHA to drill the intermediate hole section.
3. Kick-off 17.0ppg KO plug with RSS BHA.Once kick-off is confirmed, pull up to TOC and open underreamer.
4. Drill 9-7/8"x 11" hole to section TD. Use Managed Pressure Drilling to maintain constant bottom hole
pressure on connections once drilling the lower shales(LWD Program:GR/Res)../
5. Pull out of hole with drilling BHA. Install 7-5/8"casing rams and test to 3500 psi.
6. Run 7-5/8"casing and cement to 500'above hydrocarbon bearing zones.
7. Install variable bore rams in BOP.
8. Test BOPE to 250 psi low/3500 psi high. Provide AOGCC 24hr notice prior to testing.
9. Pick up and run in hole with 6-3/4"drilling BHA.Verify top of cement with sonic tool in recorded mode.
Provide TOC and log to AOGCC prior to running completion.
10. Pressure test casing to 3,500 psi for 30 minutes and chart.
11. Drill out shoe track and 20 feet of new formation. Perform FIT to 12.0ppg. Minimum required leak-off value is
11.0 ppg EMW.
12. Drill 6-3/4" hole to section TD(LWD Program:GR/Res/Sonic for TOC evaluation). /
13. Pull out of hole with drilling BHA to the casing shoe. rt I �ktr- /`rG Ll C
p --
14. Displace casing over to completion fluid.
✓-ir� ¢G VIre-?1 CO'" p
15. Pull out of hole to surface with drilling BHA.
16. RIH with 4.5"tubing with Baker Premier production packer.
17. Space out and land hanger.
18. Install 2-way check and pressure test hanger seals to 5000 psi. Nipple down BOP.
19. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2-way check.
20. Test tubing and tubing-casing annulus separately to 3500 psi/30 mins.
21. Shear circulation valve in GLM.
22. Circulate tubing to diesel and install freeze protection in the annulus.
23. Set BPV and secure well. RDMO.
CD5-02 APD
Page 8 of 15
Printed:3-May-16
S •
Application for Permit to Drill,Well CRU CD5-02
Saved:3-May-16
14. Discussion of Mud and Cuttings Disposal and Annular Disposal
(Requirements of 20 AAC25.005(c)(14))
Incidental fluids developed from drilling operations on well CD5-02 will be injected into the surface casing x
production casing annulus of CD5-05 and/or CD5-03 and/or CD5-315 wells upon approval.Well CD1-01A will be
used as a backup disposal well or for excess fluid volumes.
The CD5-02A surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze
protecting with diesel to 2000'TVD. Significant hydrocarbon zones include only the Alpine sand based on pre-drill
interpretations.There will be 500'of cement fill placed above the top of the Alpine reservoir.
Once CD5-02A has been drilled and completed,consideration may be given to permit this well for annular
injection.
An application for Sundry Operations form 10-403 will then be filed. Annular pumping of fluids occurring due to
drilling operations, per regulation 20 AAC 25.080 could then begin once properly permitted. As stated above,any
zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no
USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference
the enclosed directional drilling plan for other formation markers in this well.
Surface casing will be set near the base of the Schrader Bluff Formation (C-40). These 450-500'thick shales are
part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas.
The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the
specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid
wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection,
the maximum pressure at the surface casing shoe is estimated by:
Max Shoe Pressure =(12.0 ppg) * (0.052)*(Surf.Shoe TVD)+1,500 psi
=(12.0 ppg) * (0.052)*(2,189')+1,500 psi
=2866 psi
Pore Pressure = 1,061 psi
Therefore
Differential=2866—1061=1805 psi.
The internal casing pressure is conservative,since frictional losses while pumping have not been taken into
consideration. The surface and intermediate casing strings exposed to the annular pumping operations have
sufficient strength by using the 85%collapse and burst ratings listed in the following table:
OD Wt Grade Range Connection Collapse 85%of Burst 85%of
(ppf) Type Collapse Burst
10-3/4" 45.5 L-80 3 HYD563/BTCM 2470 psi 2100 psi 5210 psi 4429 psi
7-5/8" 29.7 L-80 3 HYD563/BTCM 4790 psi 4071 psi 6890 psi 5856 psi
CD5-02 APD
Page 9 of 15
Printed:3-May-16
• S
Application for Permit to Drill,Well CRU CD5-02
Saved:3-May-16
15.Attachments
Attachment 1 Cement Summary
Attachment 2 Drilling Hazards Summary
Attachment 3 Completion Schematic
Attachment 4 Directional Plan
CD5-02 APD
Page 10 of 15
Printed:3-May-16
• S
Application for Permit to Drill,Well CRU CD5-02
Saved:3-May-16
7.625"Intermediate Casing run to 15,137'MD/7,318'TVD
Top of slurry is designed to be at 14,369' MD,which is 500' above the Alpine C.Assume 40%excess annular
volume.
Tail slurry from 14,620'MD to 13,800'MD with 15.8 ppg Class G+additives
Under reamer to Top of (14,515'—13,800')X 0.3429 ft3/ft X 1.40(40%excess) =343 ft3
Cement
Shoe to Under reamer (14,620'—14,515')X 0.2148 ft3/ft X 1.40(40%excess) =32 ft3
Shoe Joint (80')X 0.2578 ft3/ft X 1.0(0%excess)=21 ft3
Total Volume=343+32+21=396 ft3=>341 sx of 15.8 ppg Class G+0.2%D046 antifoamer,0.3%
D065 dispersant and 0.8%S002 accelerator @ 1.16 ft3/sk
Qannik Second Stage from 6,740'-6,140'MD with 15.8 ppg Class G+additives
1050' MD Across Qannik (6,740'—6,140')X 0.3429 ft3/ft X 1.40(40%excess) =288ft3
Total Volume=288 ft3=>249 sx of 15.8 ppg Class G+0.2%D046 antifoamer,0.3%D065 dispersant
and 0.8%5002 accelerator @ 1.16 ft3/sk
CD5-02 APD
Page 11 of 15
Printed:3-May-16
Application for Permit to Drill,Well CRU CD5-02
Saved:3-May-16
Attachment 2—Drilling Hazards Summary
(to be posted in Rig Floor Doghouse Prior to Spud)
(See Well Plan Attachment: Detailed Risk Information for further discussion of these risks)
9-7/8"x 11"Hole/7-5/8"Casing Interval
Event Risk Level Mitigation Strategy
Reduced pump rates, reduced trip speeds, real time equivalent
Lost circulation Low circulating density(ECD) monitoring, mud rheology, lost circulation
material
Hole swabbing on trips Low Annular pressure applied by managed pressure drilling equipment.
Abnormal Reservoir Pressure Low Well control drills,increased mud weight. No mapped faults occur
across the path of the planned wellbore.
Hydrogen Sulfide gas Low H25 drills,detection systems, alarms,standard well control
practices, mud scavengers
6-3/4"Open Hole Production Interval
Event Risk Level Mitigation Strategy
Reduced pump rates, reduced trip speeds, real time equivalent
Lost circulation Low circulating density(ECD) monitoring, mud rheology, lost circulation
material
Hole swabbing on trips Low Annular pressure applied by managed pressure drilling equipment.
Abnormal Reservoir Pressure Low Well control drills,increased mud weight.
Hydrogen Sulfide gas Low H2S drills,detection systems,alarms,standard well control
practices, mud scavengers
Well Proximity Risks:
Directional drilling/collision avoidance information as required by 20 ACC 25.050(b) is provided in the following
attachments.
Drilling Area Risks:
Reservoir Pressure:Offset injection has the potential to increase reservoir pressure over predicted. Although this
is unlikely,the rig will be prepared to weight up if required.
Weak sand stringers could be present in the overburden. LCM material will be available to seal in losses in the
intermediate section.
Lower Shale Stability: HRZ/Kalubik and instability in the production interval will require higher mud weights and
managed pressure drilling in order to stabilize the formations. Standard LCM material and well bore strengthening
pills are expected to be effective in dealing with lost circulation if needed.
CD5-02 APD
Page 12 of 15
Printed:3-May-16
•
Application for Permit to Drill,Well CRU CD5-02
Saved:3-May-16
Attachment 3—Completion Schematic
CD5-02A wp11 —Alpine A Injector- Barefoot Completion
Proposed Schematic updated 5/3/2016
2094#H-40 Welded Upper Completion: Length
"
k Conductor to 115' 1)4-/"12 6#/ft TXP Tubing
2)DB 3.813" 1.5'
3)4-1/2"x 1"Camco KBMG GLM(<68°)w/DCK2 7'
pinned for 2500 psi casing to tbg shear
4)Baker Premier production packer 6'
5)DB nipple 3 750"ID 1.5'
6)VVLEG 1.5'
LI
iT ,1i 10-3/4"45.5#L-80
10,1
Hyd 563/BTC Lower Completion:
Surface Casing N/A(barefoot/OH completion)
2,423 MD/2,188TVD
,s 0
ilov
12i°
/(0°
\P
(11)
Baker Premier packer
14„050'MD!7,203'TVD
Planned TOC
•'•,.
13,800'MD/7,120'TVD
6 3/4”Hole TD
22,901'MD/7,316'ND
7 5/8"29.7 L-80
HYD563 x BTCM
Intermediate Casing
14,620'MD/7,340'TVD
e 677 .4 .631
CD5-02 APD
Page 13 of 15
Printed:3-May-16
• •
I s'!To.c \\
fTo Ii !{
§F
E §\
(
E -
■ II 1
; 2
/ \\ /
- ! .
a -
/%
■ 3 , ka ;! \?"
k /){ (:
ct! a
` [ \
$
®ƒoN
i ` ( !®!
E . .v mk{}I
of ,!
MS
z .
13) |( ® —
az 2
Et \� 1 }\?
tI 12 ikk
.
!
cc .8t
Q .r
a) -
I: :
2
.i
Q
�ƒ } (
ag
B
i +
| 7
) F
$ ;
9 §
\ j
5's /
• ID-
CD5-O2wpll 7ll08-i Plan Summary
Kalubik Kuparuk C y
Fault 1
.>5 ---C30 020 Kalubik repeat LCU/Miluveach 5
I Albian 97HRZ I Alpine D
( 8 1 1 1 _Alpine C
a) Albian II1, ---
_-
o) K2 Basal , -"-"
m '2 1 Albion 94' . .
m , i i , , ,HR -
0 1 Cl, K3 Be-AMU I Albian 95, ' \ '
K3 �, i 11 Albion 96 ` '� ` 175/8"X9-7/8"by 11"1
CD2-78��-
10 3/4"x 13-1/2" 5500 11000 1 65 00 22000 , Ipt t ,
Measured Depth 14-1/2"x 6-3/4"
110 3/4"x 13-1/21 Depth Reference: CD5-02:34.1+36.81 @ 70.91usf1(Doyon 19)
4..•e-e,-- Rig: Doyon 19 PA,"AIPNIk
r
`'o - " <.„, c? a 0 175/8"X 9-7/8"by 111
m o0 00 a 0 , 141/2"x 6-3/4"1
o
co i
.... r1 -4i -k/ N/ i Ni. Nr f
I I I 1 I I I 1 I i i 1 18 1,4 I pI 'g i 18 i ,1 ^�i 1 ,.
0 2500 5000 7500 10000 92560 0 1 00o 97560 ° 20000 o 2454 ----22650
2454 - 2650
Horizontal Departure 2650 - 2840
330 30
r 2840 - 3030
,1I(��N ,�� 3030 - 3220
p `TD CDS-0 PB1 ,.i : ,
- ,,.• 3220 - 3410
60 - 300 °� 60 3410 - 3610
acc
ai - TCR required 3610 - 3800
Cl) -.. 1 .............. e ......... __. ......... ............. - '\. _ 3800 - 4600
y
-8 - :... / ". i 4600 5400
30-_ _ CD2-78 Fails AC t , 5400 - 6200
O 270 -- +------r---4A 90 6200 - 7000
N
' 7000 " " 7800
,_TCR required 7800 - asoo
c1 • * asoo saoo
. 9400 - 10200
0 I I I I I I II I I ' I I I I I I I I II I III I `•�, �`-� ". 10200 - 11790
0 3000 6000 9000 12000 15000 18000 21000 240 120 11790 - 13380
SURVEY PROGRAM 41,41, -00 .
�=� 13380 - 14970
epth From Depth To Survey/Plan Tool 4� � 14970 - 16550
Pad Elevation: 34.10 16550 - 18140
100.00 600.00 CD5-02PB1 Srvy 1-SLB NSG+MSHOT(TD:C®FMEallOAS 210�� '`+ 150 18140 19730
662.12 2360.57 CD5-02PB1 Srvy 2-SLB_MWD+GMFI®!('EBdE3D&626'.®33SC
2460.02 2454.00 CD5-02PB1 Srvy 3-SLB_MWD+GMAMV(/03fOD&62B.831SC 180 19730 - 21310
2454.00 3923.99 CD5-02wp11(Plan:CD5-02) MWD CASING DETAILS 21310 - 22901
2423.99 14619.95 CD5-02wp11(Plan:CD5-02) MWD+IFR-AK-CAZSC ND MD Name
14619.95 16119.95 CD5-02wp11(Plan:CD5-02) MWD 7339.91 14619.95 7-5/8"X 9-7/8"by 11" Magnetic Model: BGGM2015 T
14619.95 22900.89 CD5-02wp11(Plan:CD5-02) MWD+IFR-AK-CAZ-SC 7315.91 22900.89 4-1/2"x6-3/4" Magnetic Model Date: 01-Apr-16
Magnetic Declination: 17.70°
To convert a Magnetic Direction to a True Direction,Add 17.70°East
SECTION DETAILS
Sec MD Inc Azi TVD +N/-S +E/-W Dleg TFace VSect Target Annotation
1 2454.00 53.78 23.30 2206.72 756.38 205.69 0.00 0.00 580.56 KOP:30100'DLS,150°TF,for 30'
2 2484.00 53.01 23.86 2224.61 778.46 215.32 3.00 150.00 595.85 Start 3.250100'DLS,120°TF,for 20' -2323.9
3 2504.00 52.68 24.57 2236.69 792.99 221.86 3.25 120.00 605.84 Adjust TF to 90",for 199.33' C30
4 2703.33 52.96 32.69 2357.27 932.18 297.87 3.25 90.00 695.35 Start 30100'DLS,-48.5°TF,for 554.61' -2640221
5 3257.94 64.81 18.98 2644.36 1358.75 500.49 3.00 -48.50 983.44 Hold for 10170.93' -2861.
6 13428.87 64.81 18.98 6973.82 10061.57 3494.55 0.00 0.00 7378.44 Start 3°/100'DLS,-70.49°TF,for 1173.32'
7 14602.19 80.00 345.50 7336.91 11157.59 3523.51 3.00 -70.49 8341.85 CD5-02 01.Heel 050216 DK Start 3.110100'DLS,0°TF,for 17.76'
8 14619.95 80.55 345.50 7339.91 11174.54 3519.12 3.11 0.00 8358.94 Hold for 20' C10
9 14639.95 80.55 345.50 7343.19 11193.64 3514.18 0.00 0.00 8378.20 Start 3.080100'DLS,0°TF,for 210'
10 14849.95 87.02 345.50 7365.91 11395.65 3461.94 3.08 0.00 8581.91 Start 3°1100'DLS,0°TF,for 99.32' -37 1
i
11 14949.27 90.00 345.50 7368.49 11491.76 3437.09 3.00 0.00 8678.83 Adjust TF to-88.27°,for 446.2'
12 15395.47 90.40 332.12 7366.93 11906.84 3276.17 3.00 -88.27 9121.73 Hold for 7505.42' = sal Mbr
13 22900.89 90.38 332.12 7315.91 18540.93 -233.49 0.00 -177.7416626.09 CD5-02 02.Toe 050216 DK TD:22900.89'MD,7315.91'TVD 1(2 Basal
-4383.3
Albian 97
KO 30' below 80° INC at top Set intermediate Drill 100' to the Fail AC against -5604.7
surface casing Alpine C casing at 7269' east of previously CD2-78. TCR Alblan 96
shoe with 150° TF. SSTVD planned lateral. required. =639i)l$an 95
fi6ai en 94
Albian 93
FCS)
Fails AC againstparent well, CD5-02PB1, = `11°lk repeat
9 = ,'. lvveach
near the heel. TCR required. , TCR required
Alpine C
By signing this I acknowledge that I have been informed of all risks,checked that the data is correct,ensured it's completeness,and all surrounding wells are assigned to the proper position and I approve the scan and
collision avoid nre olan as set out in the audit pack aoorove it an(ye basis for the final well plan and wPllsi e drawings I also acknowledge that unless notified otherwise all targets have a 100 feet lateral tolerance
Prepared by: Checked by: Accepted by: Approved by:
Brij Potnis Nate Beck Ifeanyi Ifesie Earhart,Knock
ECP- Efflig' 0- ,-CT
a) .. •• ....I
CV "
-0 0
•
im) •••• ''.1-M r8 0°°,-(C) 7
0,1
o eL
":5 GT00 a 1,10 a a 0'11E01111j RI (65ao#ft/in) an 3
0-0 cki, - -
.7ni .. sl(z 7 . - ••
1
_
CCI 01
E.0
cat) 0
- ct_
CD a
0— •-• _
CV Cs1
-
-
.)
..---,......- •
_
. ,:r f
- g 9 8 0 'e_44,.•-• .......c ' ill / / c? - , . o
..--cp c..) .:•
— ... (3..24- 111„ a ' r. / ,...00.......0 7 k .
• • CO A. ' •e
_
- _........,w'--,-----.
- ,...„, .1 .n. . -
de on,. ;:ii,,,,cs 4
.
_ ci. _ • -_...•- •
r'-'(g 0 c-7 "r"" , i `011 . .24 t.,. 0
_
II LO
4•
i \ ,10.7p.(.17; 0 '
.1. ,._
CV
0 a- a° alrr ,7..4k 4110 .:4
.m.
-2. o , .a d,. o , . -
, ,._
r .1'' '
ac-EL 4. CO / •co /
(3133 C (I AoK -
.... T;Si.:
1 i• ,_ a-.
• 0')
...Z•d .....• -.4011,4%; ".. ,,
f: 0 co • .,ft., „._ ,--
----- ..7:-Oridlirilit:;:, t i.
4:.,
..ii. , •„,...• .41. , "Iiiiit ....:. ..„;,..
c,30 . . ..s4gew•N tes
cze .E,. _.-.. .- •.: 7, _. AllW.' nc° I-- 7
-.--,,
;-• .. ,!Ai" al/ 4Its,.,
• Ai -4p, 0 i , - :-....... •vAllip,...,.....:;. ....- . 0... di
Z.:
CS/ ....4 • .a.rir,..--•Iki , 0 .,,- 3,00'flit,....4110"" !....., ; I. . t,`,...4. ',........t•Imp:"..-,.....4 4•41........ , <
. cl,,co . . i.-; •-•1 _. U.- .1,: i F._ Y' di.% 0 • , TA. ,,, ,.40. 'd ....-
:
.•:. ..- NI-A.:...."- -;,,. "Afr ,,,....,,,-- ' *I.., ,I 'IL1111›.-:-W.; 0 q 9)
. Ari X , ..•.,-- (1) , '. //r/ AO- /le . • .Iii r,‘, -... ,Ir....0.11111-__an''. V..' ' 7. 0 :.fc4; -
r- , .1 i ,o,-I
. IL.. .... ' • .= .III I ra.' o•_„„,.••'-' a 'It V i 11111 .'. ' °0 -
,-, '„---- ---=-1,i,;- - ,, i ‘44,....,.....-- --fs: <_, -
........ „._ _ ' ----:-..... _
_ _ -r. ..-
CO di .,) 1 ',411r/ ', ilMr• —
° .4/01111.1..." .-..VOI.:411111app•, ,,•"A, '-0 4 i
Iv _
-- --"--A.--'-,-, --.--=..Igidlig I I I 11.--- .•..1 1...-..--7"- 0 . ,1 41101".a....._=.6-io, N-< ' -1-
.. - _:•:...-____..,_----....0.10.10.,- _
- IfFrilk:11111111Pr-" CV sr ,f...c,i, ill' '
---
N 0 di a(0 .J. • A ,A1111.7- -
/Ai' 0 Li-) .6 C. )1 A . Lc)
:9-
,, _
.:, „.....!•••____' ..:00,..,, , ,.., di MN ;Pit MB *
eill
7
L„„_,
• to - a -
A ,c7ri ..40V OW" CO 0'6- 1 _ .a
/' I I !'n. 10 ,• CV .
S -
-
- 0
0 ., c, ••, :11:1•• LC), 0 :I.
C1 • ir
- (-) 0 - =
•, (.-.) ,_0
::,...... ..,,,
c.) .0
•...
o CD - LO
7 1,1 g 0 all (_)
0 0 IA _ CO
.....
CO .., . ,--.
"Ii• CI 0 • c.1
0.6b
• . 0 - al
-'" i it C° . 0 . M. v-
CI i C° . (N ,- CO - C
C ... r-
A
Lc')
' c'S 0 • • 0 o_ 0 ,a1 0 CA
0) q.4- 0 a CO •
II - CO
0 - ill
al -al,-- 0 •, co 6.)) 0
•
_
C) 0 .o.
a w _
CV .ct —
.4:1,1110,
1111
'I' _
_
_
_
—
s_LC)
a CV a (3 1
01
_ 0
co
I 0 -.-....... ...e...
a
...,
LO
CI -.--
0_
co
o
o
3W41111611P-. 4° / 0 a. o
o_
3‘-.
0 ' 03 X _
.1-
Cl.
_ .
„._
a.
X co
.1-
•
6-
co 0
a
Li) 0 -
Lc) • Ca / .., 0
0 a / a. 0 ,r _
---1 0 0 CI. / 3 co co _
(N `4011ww."--- ; CD
/ O. -
- tO , ,.. .,..
CO 3 _
_
4D / cN 0 C -,-co _
---
_co
__ 0 co
j> • •<-
(L)
0 0 _
_
C 0 _
Ca.—
_
- < _
L _
,!,-).
_
C.1 _
—
_ 0 _
_
ex• -
z; —
csi - -
tea -
_
0 _
al -
2 , 11ii IIIIIIIIIIIIIIIIIIIIIIIIIiiiiiiIIIIIIIIIIIIIIIIIIIIIIIII IIII
cr; (umisn 0099) 6umpoN
9,
..-
0 •
Q)
y
•� o
O o
-C —o
O `r
0 0
w CO
•_ 0 Cu o
o
0
cc) o -o
COC .512
Na)
O =
VZS O o EO
N
O 0) O
O
N a_ 0 o
O0 NN 0 r`
N9 '
O � 1 I
Lo i 0
03
U '
U
No 0 0 +
CD o
co
0o CO to
4� i h CD --,
o
q► �` ' M M OcsiD a)
�
1 O 2` O
.t x
1
i 00
in N
M
M x o
co
V x �cl M M
O o
N s
=O O
N I-1
o
O a
o '
LO ftt
oo
0
CD
t
3 I I-
(�)qtoN/(-)qno
I I I I
0 g
ci
U)
,� o
4) o
w -o
0 `r
^, -- 0
W
■N 0
a N O
n O O
(4 0 co O Lo
O
N
o a)
CU
N
0O _
0O O co
(N
›, 9 O
N d 0 —a
`.. o N 0 ti
O N 0 ,
oLn ,
Lo o , ii
m 0 U
G> o o
CU Oo +
0 o ...._-
O � 0a co co
O i O w
O
O
i i 00 0(j N
�e- tp op
...... N.
C',
3 i x
moo-
o
`nca ',E0 N
s
0 N
r 0 "r) !� O x o
' o- 1- —co
Te" v 3� co coI
CL 0 N s O
0
g4
o
O o
O '
14
0
Oo
0
i LU
21 O
r
0
1
1
o o O o O O
o o O O O
U) o In O Lf)
= co
(+)111eN/(-)uPoS
• •
(0) o
__o
d-
in
Q)
0
in
G) T rn
■— 0
> 0C Y
p
Ccr
N ce
MS Z 0 UO
O Lo
O
CD 00
Q. N N
0 t o Q
o
C O� i O
I
co 0 ; in
O
>> U o
11 i
iiiii -F-
CES i
N '
O o W
O O
O M N
o
03M
i
i
Z1 c0
Vim i
i in
V i~ O
N
I 0
CV
LO 4 s° N
0 =
V
o
Z.
T I 7 7
O o O O o o O
O Ln o 1.0 O 1.0 O
co ti N ao Cr) rn
N N
T- (+)upoN/ )u}nos o o rn
• •
O
O
I •
- O
I CO
CD5-02wp11
0 if
i'2901 O
a) - O
- O
_Q co' co
a) Q �'L000 �°
` X
.5
■- V 5
CV
> as
> +'.411100 -. O
a •
2 a) U `\
O .� a) +0000 r
mom U Q 2-
-J J Q
Va) $000
O
W a) - ` `� O
as
15a a. 1$000
n LL is
Y `1 `,
, • \ ‘
,
`n 1?000 °
U O O
CO Ll. \ ` ` ` , 5 I O NO
0) N I ` \ I ` O co
c
, , 1$000 T CO
` CO
�_ • `• •• ,/r�C,
41'5000 —
C ` , o p O U
u) as . Q ). '`rII', o N
o 2 O �,I I ' — O W
11 ` 00
CID e,‘\ u T U
JT
�
(6 ,vimtt II
O s) O u
C Q II 00
ca 00� II o
W.( L I 0
CO O n 0) O
- mQ II X CO
11
�. CO •
Y Y O i i o\o
r m ` X06 I I Lr)
II 1
Clii 11
CO •\000.99
8 11 p
CO • 11 O
O 11 0
o II
0411 1 R°
O Cr)U p.(
11
]` 11
II
U O II
O 11
0,911O
11
11 0
CD
`!+` II
11 N
O- ' II
11
O • V\`' 11
CM) O 1I
II
p °�� p ' CV II
O on •/ n
O , '
T— II
I NN CO II
�'♦' ' 1 T II I I —a
`' I ' '`` II ii
, I I X it I1
I i I I I
CD O O O O O O
O O co O CD O O
0 O o O O CD O
N N T (0 CO 0
T
yldea leolpen anal
• 0
0
0
--0
00
CD5-02wp11
,
u
1, 901 _ o
o
a o
c; 0
A, Q ��000 C°
W x
■� Uas
CV
1000 4 O
= 0 O
O D .I 3 p1y000
■� 0 , < . -
l U
J
V aas
) ,(� 1'9000 0
Cill) = as ca �a z 15000
. � Y ,Y `
--,,
U1'70000 0
LL
N V 0 0
_C ` ,
--o co
o
C 1 i?000 co
,
- 8 Z0-5aC
Q oQF';' 1000 .0
C` o U
co (6 Q OOpp. _Q co
O b „ i _ U
_ oj�� " co t
Q 00 i a)
To 0 Q col
000 `\�� ' , CD2-78 X O
m I O
CO CD
OD Q % Ln O
N N 1,
O
r mas � Y 0% ,,
co °
„ ,
00ps9 0
co •
8 „ o
i, ' 0
o •Opo i„
N CD �o; ” '
I, 1
CO CO•••'
Q0
' U OOO 1I ,
s o
„ i o
Q I 11o
is N
0
I4HHI„
I I I .-
O O O V o O O O
O o m 0 O o 0
O 0 0 0 0 0 0
NN V CO CO 0
yldea 1e3i}-lan anal
i •
1-6000`
CD5-02wp 11
O
1.0
-4-
a)
^+ p U
W a) a)
IIIIIIIIIE U
Q Q iadzo-5a0 :a a
C
O
♦J
toll 0
O
06 - 115000 N-
Cl) a `
,
,
` \` " ` 0 °O
= \ \ \ C)
I \ O-
, ,
/ • ., co cr)M
aa))sa, �' Y , M
a) (6 ,\, >' "-'
L CO
LL \,
-Y 00 0
O --R.
as LU 0
YX CO CO
5 CO
U
O��L �
U) Na)
U `
_ • 50
0
N
N" ` r—
CD2-78
r
\`
O
M
•
•
N 0°�'t
O
co —O
III O O
O
Q C i ti
c6
0 Q
CD
LU
CO
CO
0 0 O CD O
O O 0 CD O
CO 0) N Ln 00
CO CO ujdaa je3i}aan anal
S •
ConocoPhillips(Alaska) Inc. -WNS
Western North Slope
CD5 Alpine West Pad
Rig: CD5-02
Plan: CD5-02
Plan: CD5-02wp11
Standard Proposal Report
03 May, 2016
3T
L
S0 SLB
Standard Proposal Report
Database: EDM Production Local Co-ordinate Reference: Well Rig:CD5-02 -
Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: CD5-02:34.1+36.81 @ 70.91usft(Doyon 19)
Project: Western North Slope MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19) a
Site: CD5 Alpine West Pad North Reference: True
Well: Rig:CD5-02 Survey Calculation Method: Minimum Curvature
Wellbore: Plan:CD5-02
Design: CD5-02wp11 kC,W 411l1MO M:1'
Project Western North Slope,North Slope Alaska,United States
Map System: System Datum: Mean Sea Level
Geo Datum: Using Well Reference Point
Map Zone: Using geodetic scale factor
Site CD5 Alpine West Pad
Site Position:
From: Map
Position Uncertainty: 0.00 usft Slot Radius: 13-3/16"
Well Rig:CD5-02
Well Position +N/-S 0.00 usft
+E/-W 0.00 usft
Position Uncertainty 0.00 usft Ground Level: 34.10 usft
Wellbore Plan:CD5-02
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
BGGM2015 4/1/2016 17.70 80.83 57,468
Design CD5-02wp11
Audit Notes:
Version: Phase: PLAN Tie On Depth: 2,454 00
Vertical Section: Depth From(TVD) +N/-S +E/-W Direction 4
(usft) (usft) (usft) (°) Plii.-
36.81 0.00 0.00 333.00
Plan Sections
Measured Vertical TVD Dogleg Build Turn
Depth Inclination Azimuth Depth System +N/-S +E/-W Rate Rate Rate Tool Face
(usft) (0) (°) (usft) usft (usft) (usft) (°/100usft) (°/100usft) (°/100usft) (0)
2,454.00 53.78 23.30 2,206.72 2,135.81 756.38 205.69 0.00 0.00 0.00 0.00
2,484.00 53.01 23.86 2,224.61 2,153.70 778.46 215.32 3.00 -2.59 1.88 150.00
2,504.00 52.68 24.57 2,236.69 2,165.78 792.99 221.86 3.25 -1.61 3.54 120.00
2,703.33 52.96 32.69 2,357.27 2,286.36 932.18 297.87 3.25 0.14 4.08 90.00
3,257.94 64.81 18.98 2,644.36 2,573.45 1,358.75 500.49 3.00 2.14 -2.47 -48.50
13,428.87 64.81 18.98 6,973.82 6,902.91 10,061.57 3,494.55 0.00 0.00 0.00 0.00
14,602.19 80.00 345.50 7,336.91 7,266.00 11,157.59 3,523.51 3.00 1.29 -2.85 -70.49
14,619.95 80.55 345.50 7,339.91 7,269.00 11,174.54 3,519.12 3.11 3.11 0.00 0.00
14,639.95 80.55 345.50 7,343.19 7,272.28 11,193.64 3,514.18 0.00 0.00 0.00 0.00
14,849.95 87.02 345.50 7,365.91 7,295.00 11,395.65 3,461.94 3.08 3.08 0.00 0.00
14,949.27 90.00 345.50 7,368.49 7,297.58 11,491.76 3,437.09 3.00 3.00 0.00 0.00
15,395.47 90.40 332.12 7,366.93 7,296.02 11,906.84 3,276.17 3.00 0.09 -3.00 -88.27
22,900.89 90.38 332.12 7,315.91 7,245.00 18,540.93 -233.49 0.00 0.00 0.00 -177.74
5/3/2016 10:47:10AM Page 2 COMPASS 5000.1 Build 74
• 0 SLB
Standard Proposal Report
Database: EDM Production Local Co-ordinate Reference: Well Rig:CD5-02
Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Project: Western North Slope MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad North Reference: True
Well: Rig:CD5-02 Survey Calculation Method: Minimum Curvature
Wellbore: Plan:CD5-02
Design: CD5-02wp11
Planned Survey
Measured Vertical
Depth Inclination Azimuth Depth TVDss +N/-S +E/-W DLS Vert Section
(usft) (0) (°) (usft) usft (usft) (usft) 2,135.81
2,454.00 53.78 23.30 2,206.72 2,135.81 756.38 205.69 2.89 580.56
KOP:3°/100'DLS,150°TF,for 30'
2,484.00 53.01 23.86 2,224.61 2,153.70 778.46 215.32 3.00 595.85
Start 3.25°/100'DLS,120°TF,for 20'
2,500.00 52.75 24.43 2,234.27 2,163.36 790.10 220.54 3.25 603.86
2,504.00 52.68 24.57 2,236.69 2,165.78 792.99 221.86 3.25 605.84
Adjust TF to 90°,for 199.33'
2,600.00 52.75 28.49 2,294.86 2,223.95 861.31 255.97 3.25 651.23
2,648.03 52.83 30.45 2,323.91 2,253.00 894.61 274.78 3.25 672.36
C30
2,700.00 52.95 32.56 2,355.26 2,284.35 929.94 296.44 3.25 694.01
2,703.33 52.96 32.69 2,357.27 2,286.36 932.18 297.87 3.25 695.35
Start 3°I100'DLS,-48.5°TF,for 554.61'
2,800.00 54.91 30.04 2,414.18 2,343.27 998.91 338.52 3.00 736.35
2,900.00 56.99 27.43 2,470.17 2,399.26 1,071.56 378.32 3.00 783.01
3,000.00 59.12 24.93 2,523.09 2,452.18 1,147.70 415.73 3.00 833.87
3,100.00 61.29 22.55 2,572.78 2,501.87 1,227.14 450.65 3.00 888.80
3,200.00 63.51 20.27 2,619.11 2,548.20 1,309.63 482.98 3.00 947.63
3,252.65 64.69 19.10 2,642.11 2,571.20 1,354.23 498.93 3.00 980.12
C20
3,257.94 64.81 18.98 2,644.36 2,573.45 1,358.75 500.49 3.00 983.44
Hold for 10170.93'
3,300.00 64.81 18.98 2,662.27 2,591.36 1,394.74 512.87 0.00 1,009.88
3,400.00 64.81 18.98 2,704.84 2,633.93 1,480.30 542.31 0.00 1,072.76
3,500.00 64.81 18.98 2,747.40 2,676.49 1,565.87 571.74 0.00 1,135.63
3,600.00 64.81 18.98 2,789.97 2,719.06 1,651.43 601.18 0.00 1,198.51
3,700.00 64.81 18.98 2,832.54 2,761.63 1,737.00 630.62 0.00 1,261.38
3,767.59 64.81 18.98 2,861.31 2,790.40 1,794.84 650.52 0.00 1,303.88
C10
3,800.00 64.81 18.98 2,875.10 2,804.19 1,822.57 660.06 0.00 1,324.26
3,900.00 64.81 18.98 2,917.67 2,846.76 1,908.13 689.49 0.00 1,387.13
4,000.00 64.81 18.98 2,960.24 2,889.33 1,993.70 718.93 0.00 1,450.01
4,100.00 64.81 18.98 3,002.80 2,931.89 2,079.26 748.37 0.00 1,512.89
4,200.00 64.81 18.98 3,045.37 2,974.46 2,164.83 777.81 0.00 1,575.76
4,300.00 64.81 18.98 3,087.94 3,017.03 2,250.39 807.24 0.00 1,638.64
4,400.00 64.81 18.98 3,130.51 3,059.60 2,335.96 836.68 0.00 1,701.51
4,500.00 64.81 18.98 3,173.07 3,102.16 2,421.53 866.12 0.00 1,764.39
4,600.00 64.81 18.98 3,215.64 3,144.73 2,507.09 895.56 0.00 1,827.26
4,700.00 64.81 18.98 3,258.21 3,187.30 2,592.66 924.99 0.00 1,890.14
4,800.00 64.81 18.98 3,300.77 3,229.86 2,678.22 954.43 0.00 1,953.01
4,900.00 64.81 18.98 3,343.34 3,272.43 2,763.79 983.87 0.00 2,015.89
5,000.00 64.81 18.98 3,385.91 3,315.00 2,849.35 1,013.30 0.00 2,078.76
5,100.00 64.81 18.98 3,428.47 3,357.56 2,934.92 1,042.74 0.00 2,141.64
5,200.00 64.81 18.98 3,471.04 3,400.13 3,020.49 1,072.18 0.00 2,204.51
5,300.00 64.81 18.98 3,513.61 3,442.70 3,106.05 1,101.62 0.00 2,267.39
5/3/2016 10:47:10AM Page 3 COMPASS 5000.1 Build 74
SS SLB
Standard Proposal Report
Database: EDM Production Local Co-ordinate Reference: Well Rig:CD5-02
Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Project: Western North Slope MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad North Reference: True
Well: Rig:CD5-02 Survey Calculation Method: Minimum Curvature
Wellbore: Plan:CD5-02
Design: CD5-02wp11
Planned Survey
Measured Vertical
Depth Inclination Azimuth Depth TVDss +N/-S +E/-W DLS Vert Section
(usft) (°) (°) (usft) usft (usft) (usft) 3,485.27
5,400.00 64.81 18.98 3,556.18 3,485.27 3,191.62 1,131.05 0.00 2,330.26
5,500.00 64.81 18.98 3,598.74 3,527.83 3,277.18 1,160.49 0.00 2,393.14
5,600.00 64.81 18.98 3,641.31 3,570.40 3,362.75 1,189.93 0.00 2,456.01
5,700.00 64.81 18.98 3,683.88 3,612.97 3,448.31 1,219.37 0.00 2,518.89
5,800.00 64.81 18.98 3,726.44 3,655.53 3,533.88 1,248.80 0.00 2,581.76
5,900.00 64.81 18.98 3,769.01 3,698.10 3,619.45 1,278.24 0.00 2,644.64
5,933.12 64.81 18.98 3,783.11 3,712.20 3,647.79 1,287.99 0.00 2,665.47
K3
6,000.00 64.81 18.98 3,811.58 3,740.67 3,705.01 1,307.68 0.00 2,707.52
6,100.00 64.81 18.98 3,854.14 3,783.23 3,790.58 1,337.12 0.00 2,770.39
6,200.00 64.81 18.98 3,896.71 3,825.80 3,876.14 1,366.55 0.00 2,833.27
6,300.00 64.81 18.98 3,939.28 3,868.37 3,961.71 1,395.99 0.00 2,896.14
6,400.00 64.81 18.98 3,981.84 3,910.93 4,047.27 1,425.43 0.00 2,959.02
6,414.48 64.81 18.98 3,988.01 3,917.10 4,059.67 1,429.69 0.00 2,968.12
K3 Basal Mbr
6,478.85 64.81 18.98 4,015.41 3,944.50 4,114.75 1,448.64 0.00 3,008.60
K2
6,500.00 64.81 18.98 4,024.41 3,953.50 4,132.84 1,454.87 0.00 3,021.89
6,600.00 64.81 18.98 4,066.98 3,996.07 4,218.41 1,484.30 0.00 3,084.77
6,640.01 64.81 18.98 4,084.01 4,013.10 4,252.64 1,496.08 0.00 3,109.92
K2 Basal
6,700.00 64.81 18.98 4,109.55 4,038.64 4,303.97 1,513.74 0.00 3,147.64
6,800.00 64.81 18.98 4,152.11 4,081.20 4,389.54 1,543.18 0.00 3,210.52
6,900.00 64.81 18.98 4,194.68 4,123.77 4,475.10 1,572.62 0.00 3,273.39
7,000.00 64.81 18.98 4,237.25 4,166.34 4,560.67 1,602.05 0.00 3,336.27
7,100.00 64.81 18.98 4,279.81 4,208.90 4,646.23 1,631.49 0.00 3,399.14
7,200.00 64.81 18.98 4,322.38 4,251.47 4,731.80 1,660.93 0.00 3,462.02
7,300.00 64.81 18.98 4,364.95 4,294.04 4,817.37 1,690.37 0.00 3,524.89
7,343.14 64.81 18.98 4,383.31 4,312.40 4,854.28 1,703.07 0.00 3,552.02
Albian 97
7,400.00 64.81 18.98 4,407.51 4,336.60 4,902.93 1,719.80 0.00 3,587.77
7,500.00 64.81 18.98 4,450.08 4,379.17 4,988.50 1,749.24 0.00 3,650.64
7,600.00 64.81 18.98 4,492.65 4,421.74 5,074.06 1,778.68 0.00 3,713.52
7,700.00 64.81 18.98 4,535.22 4,464.31 5,159.63 1,808.12 0.00 3,776.40
7,800.00 64.81 18.98 4,577.78 4,506.87 5,245.19 1,837.55 0.00 3,839.27
7,900.00 64.81 18.98 4,620.35 4,549.44 5,330.76 1,866.99 0.00 3,902.15
8,000.00 64.81 18.98 4,662.92 4,592.01 5,416.33 1,896.43 0.00 3,965.02
8,100.00 64.81 18.98 4,705.48 4,634.57 5,501.89 1,925.87 0.00 4,027.90
8,200.00 64.81 18.98 4,748.05 4,677.14 5,587.46 1,955.30 0.00 4,090.77
8,300.00 64.81 18.98 4,790.62 4,719.71 5,673.02 1,984.74 0.00 4,153.65
8,400.00 64.81 18.98 4,833.18 4,762.27 5,758.59 2,014.18 0.00 4,216.52
8,500.00 64.81 18.98 4,875.75 4,804.84 5,844.15 2,043.62 0.00 4,279.40
8,600.00 64.81 18.98 4,918.32 4,847.41 5,929.72 2,073.05 0.00 4,342.27
8,700.00 64.81 18.98 4,960.89 4,889.98 6,015.29 2,102.49 0.00 4,405.15
8,800.00 64.81 18.98 5,003.45 4,932.54 6,100.85 2,131.93 0.00 4,468.02
5/3/2016 10:47:10AM Page 4 COMPASS 5000.1 Build 74
4110
• SLB
Standard Proposal Report
Database: EDM Production Local Co-ordinate Reference: Well Rig:CD5-02
Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Project: Western North Slope MD Reference: CD5-02:34.1+36.81 @ 70.91usft(Doyon 19)
a
Site: CD5 Alpine West Pad North Reference: True
Well: Rig:CD5-02 Survey Calculation Method: Minimum Curvature
Wellbore: Plan:CD5-02
Design: CD5-02wp11
Planned Survey
Measured Vertical
Depth Inclination Azimuth. Depth TVDss +NI-S +Et-W DLS Vert Section
(usft) (°) (°) (usft) usft (usft) (usft) 4,975.11
8,900.00 64.81 18.98 5,046.02 4,975.11 6,186.42 2,161.37 0.00 4,530.90
9,000.00 64.81 18.98 5,088.59 5,017.68 6,271.98 2,190.80 0.00 4,593.77
9,100.00 64.81 18.98 5,131.15 5,060.24 6,357.55 2,220.24 0.00 4,656.65
9,200.00 64.81 18.98 5,173.72 5,102.81 6,443.11 2,249.68 0.00 4,719.52
9,300.00 64.81 18.98 5,216.29 5,145.38 6,528.68 2,279.12 0.00 4,782.40
9,400.00 64.81 18.98 5,258.85 5,187.94 6,614.25 2,308.55 0.00 4,845.27
9,500.00 64.81 18.98 5,301.42 5,230.51 6,699.81 2,337.99 0.00 4,908.15
9,600.00 64.81 18.98 5,343.99 5,273.08 6,785.38 2,367.43 0.00 4,971.03
9,700.00 64.81 18.98 5,386.55 5,315.64 6,870.94 2,396.87 0.00 5,033.90
9,800.00 64.81 18.98 5,429.12 5,358.21 6,956.51 2,426.30 0.00 5,096.78
9,900.00 64.81 18.98 5,471.69 5,400.78 7,042.07 2,455.74 0.00 5,159.65
10,000.00 64.81 18.98 5,514.26 5,443.35 7,127.64 2,485.18 0.00 5,222.53
10,100.00 64.81 18.98 5,556.82 5,485.91 7,213.21 2,514.62 0.00 5,285.40
10,200.00 64.81 18.98 5,599.39 5,528.48 7,298.77 2,544.05 0.00 5,348.28
10,212.50 64.81 18.98 5,604.71 5,533.80 7,309.47 2,547.73 0.00 5,356.14
Albian 96
10,300.00 64.81 18.98 5,641.96 5,571.05 7,384.34 2,573.49 0.00 5,411.15
10,400.00 64.81 18.98 5,684.52 5,613.61 7,469.90 2,602.93 0.00 5,474.03
10,500.00 64.81 18.98 5,727.09 5,656.18 7,555.47 2,632.37 0.00 5,536.90
10,600.00 64.81 18.98 5,769.66 5,698.75 7,641.03 2,661.80 0.00 5,599.78
10,700.00 64.81 18.98 5,812.22 5,741.31 7,726.60 2,691.24 0.00 5,662.65
10,800.00 64.81 18.98 5,854.79 5,783.88 7,812.17 2,720.68 0.00 5,725.53
10,900.00 64.81 18.98 5,897.36 5,826.45 7,897.73 2,750.12 0.00 5,788.40
11,000.00 64.81 18.98 5,939.93 5,869.02 7,983.30 2,779.55 0.00 5,851.28
11,100.00 64.81 18.98 5,982.49 5,911.58 8,068.86 2,808.99 0.00 5,914.15
11,200.00 64.81 18.98 6,025.06 5,954.15 8,154.43 2,838.43 0.00 5,977.03
11,300.00 64.81 18.98 6,067.63 5,996.72 8,239.99 2,867.87 0.00 6,039.90
11,400.00 64.81 18.98 6,110.19 6,039.28 8,325.56 2,897.30 0.00 6,102.78
11,500.00 64.81 18.98 6,152.76 6,081.85 8,411.13 2,926.74 0.00 6,165.66
11,600.00 64.81 18.98 6,195.33 6,124.42 8,496.69 2,956.18 0.00 6,228.53
11,700.00 64.81 18.98 6,237.89 6,166.98 8,582.26 2,985.61 0.00 6,291.41
11,800.00 64.81 18.98 6,280.46 6,209.55 8,667.82 3,015.05 0.00 6,354.28
11,900.00 64.81 18.98 6,323.03 6,252.12 8,753.39 3,044.49 0.00 6,417.16
12,000.00 64.81 18.98 6,365.60 6,294.69 8,838.95 3,073.93 0.00 6,480.03
12,058.77 64.81 18.98 6,390.61 6,319.70 8,889.24 3,091.23 0.00 6,516.98
Albian 94
12,059.00 64.81 18.98 6,390.71 6,319.80 8,889.44 3,091.30 0.00 6,517.13
Albian 95
12,100.00 64.81 18.98 6,408.16 6,337.25 8,924.52 3,103.36 0.00 6,542.91
12,200.00 64.81 18.98 6,450.73 6,379.82 9,010.09 3,132.80 0.00 6,605.78
12,300.00 64.81 18.98 6,493.30 6,422.39 9,095.65 3,162.24 0.00 6,668.66
12,400.00 64.81 18.98 6,535.86 6,464.95 9,181.22 3,191.68 0.00 6,731.53
12,500.00 64.81 18.98 6,578.43 6,507.52 9,266.78 3,221.11 0.00 6,794.41
12,568.08 64.81 18.98 6,607.41 6,536.50 9,325.04 3,241.16 0.00 6,837.21
Albian 93
5/3/2016 10:47:10AM Page 5 COMPASS 5000.1 Build 74
• S SLB
Standard Proposal Report
Database: EDM Production Local Co-ordinate Reference: Well Rig:CD5-02
Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Project: Western North Slope MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site:` CD5 Alpine West Pad North Reference: True
Well: Rig:CD5-02 Survey Calculation Method: Minimum Curvature
Wellbore: Plan:CD5-02
Design: CD5-02wp11
Planned Survey
Measured Vertical
Depth Inclination Azimuth Depth TVDss +N/-S +El-W DLS Vert Section
(usft) (°) (°) (usft) usft (usft) (usft) 6,550.09
12,600.00 64.81 18.98 6,621.00 6,550.09 9,352.35 3,250.55 0.00 6,857.28
12,700.00 64.81 18.98 6,663.56 6,592.65 9,437.91 3,279.99 0.00 6,920.16
12,800.00 64.81 18.98 6,706.13 6,635.22 9,523.48 3,309.43 0.00 6,983.03
12,900.00 64.81 18.98 6,748.70 6,677.79 9,609.05 3,338.86 0.00 7,045.91
13,000.00 64.81 18.98 6,791.26 6,720.35 9,694.61 3,368.30 0.00 7,108.78
13,100.00 64.81 18.98 6,833.83 6,762.92 9,780.18 3,397.74 0.00 7,171.66
13,179.35 64.81 18.98 6,867.61 6,796.70 9,848.08 3,421.10 0.00 7,221.55
HRZ(FCS)
13,200.00 64.81 18.98 6,876.40 6,805.49 9,865.74 3,427.18 0.00 7,234.53
13,293.53 64.81 18.98 6,916.21 6,845.30 9,945.77 3,454.71 0.00 7,293.34
HRZ
13,300.00 64.81 18.98 6,918.97 6,848.06 9,951.31 3,456.61 0.00 7,297.41
13,400.00 64.81 18.98 6,961.53 6,890.62 10,036.87 3,486.05 0.00 7,360.29
13,428.87 64.81 18.98 6,973.82 6,902.91 10,061.57 3,494.55 0.00 7,378.44
Start 3°7100'DLS,-70.49°TF,for 1173.32'
13,500.00 65.54 16.78 7,003.69 6,932.78 10,123.01 3,514.37 3.00 7,424.18
13,517.98 65.73 16.22 7,011.11 6,940.20 10,138.71 3,519.02 3.00 7,436.06
Kalubik repeat
13,600.00 66.61 13.71 7,044.25 6,973.34 10,211.19 3,538.38 3.00 7,491.84
13,690.70 67.64 10.98 7,079.51 7,008.60 10,292.81 3,556.24 3.00 7,556.46
Fault
13,700.00 67.75 10.70 7,083.04 7,012.13 10,301.27 3,557.86 3.00 7,563.26
13,800.00 68.94 7.74 7,119.95 7,049.04 10,393.00 3,572.74 3.00 7,638.24
13,900.00 70.18 4.82 7,154.87 7,083.96 10,486.13 3,582.98 3.00 7,716.57
13,907.81 70.28 4.60 7,157.51 7,086.60 10,493.45 3,583.58 3.00 7,722.82
Kalubik
14,000.00 71.47 1.95 7,187.71 7,116.80 10,580.40 3,588.55 3.00 7,798.04
14,100.00 72.80 359.13 7,218.39 7,147.48 10,675.56 3,589.44 3.00 7,882.42
14,200.00 74.17 356.35 7,246.81 7,175.90 10,771.35 3,585.65 3.00 7,969.49
14,273.36 75.20 354.33 7,266.19 7,195.28 10,841.87 3,579.90 3.00 8,034.94
Kuparuk C
14,287.63 75.40 353.94 7,269.81 7,198.90 10,855.60 3,578.49 3.00 8,047.81
LCU/Miluveach
14,300.00 75.58 353.60 7,272.91 7,202.00 10,867.50 3,577.19 3.00 8,059.01
14,400.00 77.01 350.89 7,296.60 7,225.69 10,963.76 3,564.07 3.00 8,150.72
14,500.00 78.48 348.21 7,317.83 7,246.92 11,059.84 3,546.34 3.00 8,244.39
14,548.47 79.20 346.92 7,327.21 7,256.30 11,106.28 3,536.10 3.00 8,290.41
Alpine D
14,600.00 79.97 345.56 7,336.53 7,265.62 11,155.50 3,524.05 3.00 8,339.74
14,602.19 80.00 345.50 7,336.91 7,266.00 11,157.59 3,523.51 3.00 8,341.85
Start 3.11'1100'DLS,0°TF,for 17.76'-Alpine C
14,619.95 80.55 345.50 7,339.91 7,269.00 11,174.54 3,519.13 3.11 8,358.94
Hold for 20'-7-5/8"X 9-7/8"by 11"
14,639.95 80.55 345.50 7,343.19 7,272.28 11,193.64 3,514.18 0.00 8,378.20
Start 3.08°/100'DLS,0°TF,for 210'
5/3/2016 10:47:10AM Page 6 COMPASS 5000.1 Build 74
• S SLB
Standard Proposal Report
Database: EDM Production Local Co-ordinate Reference: Well Rig:CD5-02
Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Project: Western North Slope MD Reference: CD5 02:34.1+36.81 @ 70.91 usft(Doyon 19)
Site: CD5 Alpine West Pad North Reference: True
Well: Rig:CD5-02 Survey Calculation Method: Minimum Curvature
Wellbore: Plan:CD5-02
Design: CD5-02wp11
Planned Survey
Measured Vertical
Depth Inclination Azimuth Depth TVDss +N/-S +E/-W DLS Vert Section
(usft) (°) (°) (usft) usft (usft) (usft) 7,281.18
14,700.00 82.40 345.50 7,352.09 7,281.18 11,251.13 3,499.32 3.08 8,436.18
14,800.00 85.48 345.50 7,362.64 7,291.73 11,347.39 3,474.42 3.08 8,533.25
14,849.95 87.02 345.50 7,365.91 7,295.00 11,395.65 3,461.94 3.08 8,581.91
Start 3°/100'DLS,0°TF,for 99.32'
14,900.00 88.52 345.50 7,367.86 7,296.95 11,444.07 3,449.42 3.00 8,630.73
14,949.27 90.00 345.50 7,368.49 7,297.58 11,491.76 3,437.09 3.00 8,678.83
Adjust TF to-88.27°,for 446.2'
15,000.00 90.05 343.98 7,368.47 7,297.56 11,540.70 3,423.73 3.00 8,728.50
15,100.00 90.14 340.98 7,368.31 7,297.40 11,636.05 3,393.63 3.00 8,827.12
15,200.00 90.23 337.98 7,368.00 7,297.09 11,729.70 3,358.58 3.00 8,926.47
15,300.00 90.32 334.98 7,367.52 7,296.61 11,821.38 3,318.69 3.00 9,026.27
15,395.47 90.40 332.12 7,366.93 7,296.02 11,906.84 3,276.17 3.00 9,121.73
Hold for 7505.42'
15,400.00 90.40 332.12 7,366.90 7,295.99 11,910.85 3,274.05 0.00 9,126.26
15,500.00 90.40 332.12 7,366.20 7,295.29 11,999.24 3,227.29 0.00 9,226.24
15,600.00 90.40 332.12 7,365.50 7,294.59 12,087.63 3,180.53 0.00 9,326.23
15,700.00 90.40 332.12 7,364.80 7,293.89 12,176.02 3,133.77 0.00 9,426.21
15,800.00 90.40 332.12 7,364.11 7,293.20 12,264.41 3,087.01 0.00 9,526.20
15,900.00 90.40 332.12 7,363.41 7,292.50 12,352.80 3,040.25 0.00 9,626.18
16,000.00 90.40 332.12 7,362.72 7,291.81 12,441.19 2,993.49 0.00 9,726.17
16,100.00 90.40 332.12 7,362.02 7,291.11 12,529.58 2,946.72 0.00 9,826.16
16,200.00 90.40 332.12 7,361.33 7,290.42 12,617.97 2,899.96 0.00 9,926.14
16,300.00 90.40 332.12 7,360.63 7,289.72 12,706.37 2,853.20 0.00 10,026.13
16,400.00 90.40 332.12 7,359.94 7,289.03 12,794.76 2,806.44 0.00 10,126.11
16,500.00 90.40 332.12 7,359.25 7,288.34 12,883.15 2,759.68 0.00 10,226.10
16,600.00 90.40 332.12 7,358.55 7,287.64 12,971.54 2,712.92 0.00 10,326.09
16,700.00 90.40 332.12 7,357.86 7,286.95 13,059.93 2,666.16 0.00 10,426.07
16,800.00 90.40 332.12 7,357.17 7,286.26 13,148.32 2,619.40 0.00 10,526.06
16,900.00 90.40 332.12 7,356.48 7,285.57 13,236.71 2,572.63 0.00 10,626.04
17,000.00 90.40 332.12 7,355.79 7,284.88 13,325.10 2,525.87 0.00 10,726.03
17,100.00 90.40 332.12 7,355.10 7,284.19 13,413.49 2,479.11 0.00 10,826.01
17,200.00 90.39 332.12 7,354.41 7,283.50 13,501.88 2,432.35 0.00 10,926.00
17,300.00 90.39 332.12 7,353.72 7,282.81 13,590.27 2,385.59 0.00 11,025.99
17,400.00 90.39 332.12 7,353.03 7,282.12 13,678.66 2,338.83 0.00 11,125.97
17,500.00 90.39 332.12 7,352.34 7,281.43 13,767.05 2,292.07 0.00 11,225.96
17,600.00 90.39 332.12 7,351.66 7,280.75 13,855.44 2,245.31 0.00 11,325.94
17,700.00 90.39 332.12 7,350.97 7,280.06 13,943.83 2,198.54 0.00 11,425.93
17,800.00 90.39 332.12 7,350.28 7,279.37 14,032.23 2,151.78 0.00 11,525.92
17,900.00 90.39 332.12 7,349.60 7,278.69 14,120.62 2,105.02 0.00 11,625.90
18,000.00 90.39 332.12 7,348.91 7,278.00 14,209.01 2,058.26 0.00 11,725.89
18,100.00 90.39 332.12 7,348.23 7,277.32 14,297.40 2,011.50 0.00 11,825.87
18,200.00 90.39 332.12 7,347.54 7,276.63 14,385.79 1,964.74 0.00 11,925.86
18,300.00 90.39 332.12 7,346.86 7,275.95 14,474.18 1,917.98 0.00 12,025.84
18,400.00 90.39 332.12 7,346.17 7,275.26 14,562.57 1,871.21 0.00 12,125.83
18,500,00 90.39 332.12 7,345.49 7,274.58 14,650.96 1,824.45 0.00 12,225.82
5/3/2016 10:47:10AM Page 7 COMPASS 5000.1 Build 74
• 0 SLB
Standard Proposal Report
Database: EDM Production Local Co-ordinate Reference: Well Rig:CD5-02
Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Project: Western North Slope MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19) Ii
Site: CD5 Alpine West Pad North Reference: True
Well: Rig:CD5-02 Survey Calculation Method: Minimum Curvature
Wellbore: Plan:CD5-02 III.
Design: CD5-02wp11
Planned Survey
Measured Vertical
Depth Inclination Azimuth Depth TVDss +N/-S +E/-W DLS Vert Section
(usft) (°) (°) (usft) usft (usft) (usft) 7,273.90
18,600.00 90.39 332.12 7,344.81 7,273.90 14,739.35 1,777.69 0.00 12,325.80
18,700.00 90.39 332.12 7,344.13 7,273.22 14,827.74 1,730.93 0.00 12,425.79
18,800.00 90.39 332.12 7,343.44 7,272.53 14,916.13 1,684.17 0.00 12,525.77
18,900.00 90.39 332.12 7,342.76 7,271.85 15,004.52 1,637.41 0.00 12,625.76
19,000.00 90.39 332.12 7,342.08 7,271.17 15,092.91 1,590.64 0.00 12,725.75
19,100.00 90.39 332.12 7,341.40 7,270.49 15,181.30 1,543.88 0.00 12,825.73
19,200.00 90.39 332.12 7,340.72 7,269.81 15,269.69 1,497.12 0.00 12,925.72
19,300.00 90.39 332.12 7,340.04 7,269.13 15,358.08 1,450.36 0.00 13,025.70
19,400.00 90.39 332.12 7,339.36 7,268.45 15,4.46.47 1,403.60 0.00 13,125.69
19,500.00 90.39 332.12 7,338.69 7,267.78 15,534.86 1,356.84 0.00 13,225.68
19,600.00 90.39 332.12 7,338.01 7,267.10 15,623.25 1,310.07 0.00 13,325.66
19,700.00 90.39 332.12 7,337.33 7,266.42 15,711.65 1,263.31 0.00 13,425.65
19,800.00 90.39 332.12 7,336.65 7,265.74 15,800.04 1,216.55 0.00 13,525.63
19,900.00 90.39 332.12 7,335.98 7,265.07 15,888.43 1,169.79 0.00 13,625.62
20,000.00 90.39 332.12 7,335.30 7,264.39 15,976.82 1,123.03 0.00 13,725.60
20,100.00 90.39 332.12 7,334.63 7,263.72 16,065.21 1,076.26 0.00 13,825.59
20,200.00 90.39 332.12 7,333.95 7,263.04 16,153.60 1,029.50 0.00 13,925.58
20,300.00 90.39 332.12 7,333.28 7,262.37 16,241.99 982.74 0.00 14,025.56
20,400.00 90.39 332.12 7,332.60 7,261.69 16,330.38 935.98 0.00 14,125.55
20,500.00 90.39 332.12 7,331.93 7,261.02 16,418.77 889.22 0.00 14,225.53
20,600.00 90.39 332.12 7,331.26 7,260.35 16,507.16 842.45 0.00 14,325.52
20,700.00 90.39 332.12 7,330.58 7,259.67 16,595.55 795.69 0.00 14,425.51
20,800.00 90.38 332.12 7,329.91 7,259.00 16,683.94 748.93 0.00 14,525.49
20,900.00 90.38 332.12 7,329.24 7,258.33 16,772.33 702.17 0.00 14,625.48
21,000.00 90.38 332.12 7,328.57 7,257.66 16,860.72 655.41 0.00 14,725.46
21,100.00 90.38 332.12 7,327.90 7,256.99 16,949.11 608.64 0.00 14,825.45
21,200.00 90.38 332.12 7,327.23 7,256.32 17,037.50 561.88 0.00 14,925.44
21,300.00 90.38 332.12 7,326.56 7,255.65 17,125.89 515.12 0.00 15,025.42
21,400.00 90.38 332.12 7,325.89 7,254.98 17,214.28 468.36 0.00 15,125.41
21,500.00 90.38 332.12 7,325.22 7,254.31 17,302.67 421.60 0.00 15,225.39
21,600.00 90.38 332.12 7,324.56 7,253.65 17,391.06 374.83 0.00 15,325.38
21,700.00 90.38 332.12 7,323.89 7,252.98 17,479.45 328.07 0.00 15,425.37
21,800.00 90.38 332.12 7,323.22 7,252.31 17,567.84 281.31 0.00 15,525.35
21,900.00 90.38 332.12 7,322.55 7,251.64 17,656.23 234.55 0.00 15,625.34
22,000.00 90.38 332.12 7,321.89 7,250.98 17,744.62 187.79 0.00 15,725.32
22,100.00 90.38 332.12 7,321.22 7,250.31 17,833.01 141.02 0.00 15,825.31
22,200.00 90.38 332.12 7,320.56 7,249.65 17,921.41 94.26 0.00 15,925.30
22,300.00 90.38 332.12 7,319.89 7,248.98 18,009.80 47.50 0.00 16,025.28
22,400.00 90.38 332.12 7,319.23 7,248.32 18,098.19 0.74 0.00 16,125.27
22,500.00 90.38 332.12 7,318.57 7,247.66 18,186.58 -46.03 0.00 16,225.25
22,600.00 90.38 332.12 7,317.90 7,246.99 18,274.97 -92.79 0.00 16,325.24
22,700.00 90.38 332.12 7,317.24 7,246.33 18,363.36 -139.55 0.00 16,425.23
22,800.00 90.38 332.12 7,316.58 7,245.67 18,451.75 -186.31 0.00 16,525.21
22,900.00 90.38 332.12 7,315.92 7,245.01 18,540.14 -233.08 0.00 16,625.20
5/3/2016 10:47:10AM Page 8 COMPASS 5000.1 Build 74
410
0 SLB
Standard Proposal Report
Database: EDM Production Local Co-ordinate Reference: Well Rig:CD5-02
Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Project: Western North Slope MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19) v
Site: CD5 Alpine West Pad North Reference: True
Well: Rig:CD5-02 Survey Calculation Method: Minimum Curvature
Wellbore: Plan:CD5-02
Design: CD5-02wp11
Planned Survey
Measured Vertical
Depth Inclination Azimuth Depth TVDss +N1-S +El-W DLS Vert Section
(usft) (°) (°) (usft) usft (usft) (usft) 7,245.00
22,900.89 90.38 332.12 7,315.91 7,245 00 18540.92 -233.49 0.00 16,626.09
TD:22900.89'MD,7315.91'TVD-4-1/2"x 6-3/4"
Targets
Target Name
-hit/miss target Dip Angle Dip Dir. TVD +N/-S +El-W
-Shape (0) (0) (usft) (usft) (usft)
CD5-. 050216 DK 0.00 0.00 7,315 91 18,540.93 -233.49
-plan hits target center
-Circle(radius 100.00)
CD5-02 01.Heel 050216 DK 0.00 0.00 7,336.91 11,157.59 3,523.51
-plan hits target center
-Circle(radius 100.00)
CD5-02 Polygon 050216 BP 0.00 0.00 0.00 11,953.61 3,364.56
-plan misses target center by 7092.58usft at 12040.99usft MD(6383.04 TVD,8874.03 N,3085.99 E)
-Polygon
Point 1 0.00 2.01 -0.53
Point 2 0.00 6,636.10 -3,510.19
Point 3 0.00 6,542.56 -3,686.98
Point 4 0.00 -91.53 -177.32
1 Casing Points
Measured Vertical Casing Hole
Depth Depth Diameter Diameter
(usft) (usft) Name (") (")
14,619.95 7,339.91 7-5/8"X 9-7/8"by 11" 7-5/8 11
22,900 89 7,315.91 4-1/2"x 6-3/4" 4-1/2 6-3/4
5/3/2016 10:47:10AM Page 9 COMPASS 5000.1 Build 74
• 0 SLB
Standard Proposal Report
Database: EDM Production Local Co-ordinate Reference: Well Rig:CD5-02
Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Project: Western North Slope MD Reference: CD5-02:34.1+36.81 @ 70.91usft(Doyon 19)
Site: CD5 Alpine West Pad North Reference: True
Well: Rig:CD5-02 Survey Calculation Method: Minimum Curvature
Wellbore: Plan:CD5-02
Design: CD5-02wp11
Formations
Measured Vertical Vertical Dip
Depth Depth Depth SS Dip Direction
(usft) (usft) Name Lithology (°) (°)
2,648.03 2,323.91 C30
12,059.00 6,390.71 Albian 95
14,548.47 7,327.21 Alpine D
12,058.77 6,390.61 Albian 94
6,640.01 4,084.01 K2 Basal
14,273.36 7,266.19 Kuparuk C
10,212.50 5,604.71 Albian 96
3,767.59 2,861.31 C10
13,907.81 7,157.51 Kalubik
6,414.48 3,988.01 K3 Basal Mbr
13,293.53 6,916.21 HRZ
7,343.14 4,383.31 Albian 97
3,252.65 2,642.11 C20
5,933.12 3,783.11 K3
14,602.19 7,336.91 Alpine C 0.00
13,690.70 7,079.51 Fault
13,179.35 6,867.61 HRZ(FCS)
13,517.98 7,011.11 Kalubik repeat
12,568.08 6,607.41 Albian 93
14,287.63 7,269.81 LCU/Miluveach
6,478.85 4,015.41 K2
Plan Annotations p
°Measured Vertical Local Coordinates > f y
Depth Depth +N/-S +E/-W '' i^
(usft) (usft) (usft) h,'
(usft) Comment
2,454.00 2,206.72 756.38 205.69 KOP:3°/100'DLS,150°TF,for 30'
2,484.00 2,224.61 778.46 215.32 Start 3.25°/100'DLS,120°TF,for 20'
2,504.00 2,236.69 792.99 221.86 Adjust TF to 90°,for 199.33'
2,703.33 2,357.27 932.18 297.87 Start 3°/100'DLS,-48.5°TF,for 554.61'
3,257.94 2,644.36 1,358.75 500.49 Hold for 10170.93'
13,428.87 6,973.82 10,061.57 3,494.55 Start 3°/100'DLS,-70.49°TF,for 1173.32'
14,602.19 7,336.91 11,157.59 3,523.51 Start 3.11°/100'DLS,0°TF,for 17.76'
14,619.95 7,339.91 11,174.54 3,519.12 Hold for 20'
14,639.95 7,343.19 11,193.64 3,514.18 Start 3.08°/100'DLS,0°TF,for 210'
14,849.95 7,365.91 11,395.65 3,461.94 Start 3°/100'DLS,0°TF,for 99.32'
14,949.27 7,368.49 11,491.76 3,437.09 Adjust TF to-88.27°,for 446.2'
15,395.47 7,366.93 11,906.84 3,276.17 Hold for 7505.42'
22,900.89 7,315.91 18,540.93 -233.49 TD:22900.89'MD,7315.91'TVD
5/3/2016 10:47:10AM Page 10 COMPASS 5000.1 Build 74
0 0
c
0
CO
.o
O .L
L; i
te
13C)
a 1—
cu
V) 13
Z ff
L
. ' Ii N
L. o mQ C i o
2 t
• p o n = C)-
(/)
V/ CD U - m 2 a)
A = mm Q
■
=• 10 Or V W
■- Q A d Q d
■..CI) 0 �, m cq o V w
QL N O T., o,• p
po a Q
-o
vzQ) NI O Mr Uo O . a _
m
o
a w = u' v m� 0 JON LrO = a + 0 O L 0 O zY Nyt
• LQ V ( O � ? u)>, c - m uui aci
O N u, — c O 6 A+ c4 T °
R o ''
U Q w
c c a c c
M
U � d n U U o � � o ln ct
t o _.. a0 Nit, ° ,,gym R,« 142, ac. _
•
S .
zo u)
= 0) C
o
ci
a 0 £ o
~ z 0
C Y Y
N M N N N N N N N N N N N N
M N LY LY LY E LY iiE E E E EEE
ett O O 00000 00000 O O O
0 ca
Q 3 m co co as ccs as as
2 2 2 2 2 2 2 2 2 2 2 2 2
y
Q N N N N N N N N N N N N N N N
m Of m m m m m N m a) 037 m m m
o_ a 0- 0- 0_ 0_ 0. 0- 0- 0- 0- 0- 0- 0- 0-
= LLa
0 c
CO
0
O 'O
C d N £ a) `o `o `p m o` `5 0 `0 `0 `0 `0 p` `o `o
0 m E c m m m m m m mmmmm m m m
U m LL LL LL m LL LL LL LL LL LL LL LL L.L. LL
C y N CD N a) a) a) CD a) Cl) N N N a)
N 'p U 0 0 0 0 0 0 0 0 0 0 0 0 0
E c CC CC CCCCC c c c
E a) m m m a) m m 01770003 m m m
E. y N 03 NN NV) N N a) N a) ata
a)
U U UN UN U UN U
U U U U U U U U
O r 00 O M '1.-
f� M 7 a0 V1 a0 N CO m
W 7 O r 0) r OD UO r 1` r 2 O
a) 7 O) N- 0) N tO N. CO CO CO M M 00
C O co W N N 7 0 7O u) N r 1` O 7
a) m
N LL
U
. o 0 0 0 0 0 0 0 0 0 0 0 0 0
a C o 0 0 0 0 0 o O o O O O O O
` O O )O O 6 6 O O 6 6 N u) a O O
• L O O N- O N- N u) LO N N N N. N- 00
Iy) G M N 7 (O 7 N- CO N. CO a- CO u7 UO CO N-
I
Q 7 N N N N O W N N N M N N N N N
V
C u1 (OO) OCOO (O nN- O O 7 OONn N
O O Cr (NW VO O N M M N N Vr 1� W
0 W CO O O) N. CO N 7 7 N
CO
Q N MM 7 r r 7 0 7 O N N N N 7
W N a
co
lU
--o-
co co
1
N 7O 2 O O uN N O O O O O 0) ` N
N 7 7 UO W (O 1. UO 7 (O N 7 7 M O
O t r CD CO CO N. LO N- CO N u) u) N- co
G�" 7 0 7 7 co N- 7 7 7 7 7 7 7 7 7 Cl
p���Q v O N N N N N N N N N N N N N N
N V
E
N N O re)
O m O O M N V7 '1.&) P-. 6-)
C a- O (D O) O N- UD u7 r N r
E N O r CV - (O N 1` (D O U 6 O O 7 7
CC 7 N W O V (MO u a- CONCO CO CO (N
O C _N 2
d
li
N M CD u7 u) O O CD N O O O N
N 3 a) 0 7 CO (O O M 7) aD 7) 0 0 Cl 0 O rn
N N ` UO 7 7 W W (O t` W 7 O W 7 7 M O
0 U 4 O. O L .' co co co N. 0 N- CO u) (O u) N- CO
1 C tp - N 0. N O 7 Cl CO r 7 7 7 7 7 7 7 7 7
` U M a 0 7 (D N N N N N N N N N N N N N N
CI w X r r
Ud CV q 2
R
1 t 0 N
N 0v E
11 m m 2
1$ )m E 0
Q ❑ . L N
dO.
0 a) C
o 0 20) N
o ) a m m
co N 0 £ 3 LL LL
:
a G N N O O O
J
re N u)
` d m £ 3 (0 3 3 ❑ ❑
7 LL
O -0 a, Z o O o - U U
p a H c i `U U 6 6 ❑ ❑
c y o .0 U U U
m m rn m co
O y dco a) N J
OO V 7 7 co M 7 7 (O N- W o 0 0 0 a a O
0�t�. ' c_ p) • N. N. 1- R{ 0 0 0 o O O o .- N- (r) in )i) Ln o 0
CD C N N N N N 0. (n u7 (n U N (n (n (n U ❑ ❑ ❑ ❑
O Ce LO 74 w O Z D U U U U U U U U 0 ° U ° C C CCOO 7p
C it O a -77''
t6 ' N (a (u m N
O U O t0 y d 7 7 a0 M 7 7 (O O) O a a -a-- ❑ ❑
t 1� O O O O O O OF F
't' 7 7 d N N N d N u) (A u) (I) (t) u) u) (nCO N m
.y O N C C ❑ ❑ ❑ C ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 C O - N N
_ y N N y p a U U U a U U U U U U U U U ui U) ui (0 7) 0 0
N _
O d N .N Q 7 `I CO Q M 7 7 LI)C 1� 0 O U U U U 0 0
Co) C p) p, h f� Ni. 0 0 0 0 0 0 0 •- ,- U U
.j. C A laa Z £ N N N in u7 u) N (n N U) (n u) u) c C C C
c c u CD CD
us c.) C.) (Jou C.) 00000 U U U U a a a a E E
< Et c2 °U 0
0 •
CA
2- 0
u O
G O U
--, z
v▪)
• i-
et ro'
• 3
a.
a
O
U
O
0
O
V
12 N N N N
>1>• U U U U
Z Y Y Y Y
N 0) Q Q Q Q
0• + + + +
O 0 0 0 0 0 0
}
(r)
O
C a)
El:
T
N
Z
7
C
O
T
T iN
Q N
0)
N ,--
o a- .-a Ti a r a)
C 92
YOo0o w
Cl .9o o o C
'O
vo
O U U U U 0
a)
1 n '' E
N a) 0
0
w
oteorno) m a m
I no) a 2
_ o o v m oo o
M uo ( O" oQ o (O V a)) CO N- o)
v N N M V (0 N CoU
• Uj
U O
9 C
N (0
A 2N C
CI oa N o Ce .-
m y N
a Y
�` O N N O W a) N L- N d N W a)
N
O � O O O O m N
O O O Ni 6(o O LO N 6) O) N O` C — 0 N
14— O O N ,- (O a- V a- (O (O N :F.,
N L d 7
t i LL v N N N a- V O U C U
U N N O O co
(Q a) N N o a
Q. O 0 0) 'a w a) a) o
-2 d c m
d � N 0) 8 N
re oup
d o a -o m m m o
o`
� 3 c ac) o ai
O u) U U II N
— 0 N N O O v M
d d " N O O
O N O LL O
U
✓ N N O m U O
C
C (u W N C N 0
O Q V O N N ro y
Q
0 U (n O U Q
• •
o50 May 632016
Ladder View
CD 5-0 2 w p 1 1 The Reference Well is along the X-axis.
Error Ellipses are the Sum of the Reference and Offset Well Errors.
I s TCR required
c
U
3004 f I /1\
I
d
N
N
150
U �
U
0 I I I I I I I I I I III
Equivelant Magnetic Distance 6000 9000 12000 15000 18000 21000
Displayed interval could be less than entire well:Measured Depth2454.00 To 22900.89
SURVEY PROGRAM CASING DETAILS
Depth From Depth To Survey/Plan Tool TVD MD Name
100.00 600.00 CD5-02PB1 Srvy 1 - SLB_NSG+MSHOT(TOYD D2631) 7339.91 14619.95 7-5/8"X 9-7/8" by 11"
662.12 2360.57 CD5-02PB1 Srvy 2- SLB_MWD+GMAC (TIVI)AZ1351-10163B4-)CAZ-SC 7315.91 22900.89 4-1/2"x 6-3/4"
2460.02 2454.00 CD5-02PB1 Srvy 3- SLB_MWD+GMAC (T191)ED51433Br1P4�CAZ-SC
2454.00 3923.99 CD5-02wp11 (Plan: CD5-02) MWD
2423.99 14619.95 CD5-02wp11 (Plan: CD5-02) MWD+IFR-AK-CAZ-SC
14619.95 16119.95 CD5-02wp11 (Plan: CD5-02) MWD
14619.95 22900.89 CD5-02wp11 (Plan: CD5-02) MWD+IFR-AK-CAZ-SC
a
60
U
U
O
I-
//11/
30
U
O I
I
C
O
0 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I
2500 3000 3500 4000 4500 5000 5500 6000
Partial Measured Depth
• 111/1 U L4S4
CD5-02wp11 MD Inc Azi TVD Dleg TFace Target 2454 2650
2454.00 53.78 23.30 2206.72 0.00 0.00
2454.00 To 22900.89 2484.00 53.01 23.86 2224.61 3.00 150.00 2650 2840
2504.00 52.68 24.57 2236.69 3.25 120.00
2703.33 52.96 32.69 2357.27 3.25 90.00 2840 3030
10:52,M8 03 2016 3257.94 64.81 18.98 2644.36 3.00 -48.50 3030 3220
Y 13428.87 64.81 18.98 6973.82 0.00 0.00
CASING DETAILS 14602.19 80.00 345.50 7336.91 3.00 -70.49 CD5-02 01.Heel 050216 DK 3220 3410
14619.95 80.55 345.50 7339.91 3.11 0.00
TVD MD Name 14639.95 80.55 345.50 7343.19 0.00 0.00 3410 3610
7339.91 14619. 18' X 9-7/8" by 11^ 14849.95 87.02 345.50 7365.91 3.08 0.00
7315.91 22900.89 4-1/2" x 6-3/4" 14949.27 90.00 345.50 7368.49 3.00 0.00 3610 3800
15395.47 90.40 332.12 7366.93 3.00 -88.27
22900.89 90.38 332.12 7315.91 0.00 -177.74 CD5-02 02.Toe 050216 DK 3800 4600
SUPROGRAM4600 5400
lee88X600.BB CD5-2.01 a5rvy 1-S09_5SGHISHOIGI(hOC .02.01) 5400 6200
662.12 2380.57 C05-02PB1 St,2-SLB_MMGMAG MDhraa6I.0®4SC
2460.02 2454.00 C05-02P81 Srvy 3-SLBJ11D+GMAG MODnIPD6118A1684SG __
245d.OB 392].99 CD5-B211 (Plan:CDS-112) MA 6200 7000
2423.99 14819 95 cos-024,11 (Plan:805-02) MDaIFR-AK-CAZ-SC
14619 95 18119.95 CD5-023.11 (Plan:685-02) MD
14619.95 22900.09 COS-023.11 (Plan:C.-02) M-0.IFO-AK-CAZ-SC 7000 7800
7800 -____..- 8600
8600 """"" 9400
9400 10200
10200 11790
TCR required 0/360 11790 -- 13380
13380
- 13380 14970
', 14970 16550
-30/33 �� I.�, 30
a
1 �:� ° 16550 18140
a \- ' 18140 19730
,,;/,,,,,, � 'i 19730 21310
("yerl! /, ,, elNtll L 21310 22901
d ,
�°l'i 'I/lr;, )I VIII a ./
60/300 ; ;,� � �;- �� �, � / ,�i `\ 60
- "0"..r,...,�.�HI4b°`�-. q11���\11!0// if � � �����
~se a; „.4(6110;,'; !,'. •i '! i \.1)\I1,
II
-5--/;/ ;� /1 4 _ ,��
i 1 -M'O i 4 k ,. i Xtiltit4.r
443:04111tr/ 'e I i \ \ \ \
�` � - psisir )i,111 1 A I
I I I I I i VIA tei I : ' / / ; .\ \ \ Pi 2/ 1 1 , 1
90/270 - -1 ' i r- _ %i �� A�� f { j 90
i I
% \ \ l --A -" 1 ,--, \\ 4 s'o- ' \- ----ji 40149, ' / i 1 , I 1 i
\ , _A-- \ \ ,<, 4.1swiii, ' :.....,......-,7 // / / / / / /
A--\ \ \ \ \ 04 AfAirfora viwurl°,, °,, •, 1".:... 0.0.# / / / / / /
TD: CD5-02PB1 \ v vi , ',_ -r , 1 ; . ,, i w - ..,,.,,,,,,,,)/ 1
,,♦- �'�s� 1 / /
i,-,\ \ \ ..d4 IfofrOSA4f*'.001.--"-:- / / / ' //
--\ L,•,,\
120/240 \\��� � AP-
� ow
�-� .1 �1' 13___..-� / 120
ill kW.11116111111111117111°
�'' - 11 5 .-,
�IIP�'' - 1'80 \-,' CD2-78
' 195______--- •j �'
150/210 ~�` --- 210-�� 150
-- - 22_5_____--------
-180/ 180
• 0
Northing (6500 usft/in)
IiiiiIiiiiliiiilliiiiliiiiliiiiliiiiliiiiliiiiliiiiliiiiliiiiliiiiliiiiIii
- -
- -0 -
- CC _
- CI.
_ c -
- a.
_ -
_ -
-
— 0 -0 _
-
0
_
- -
- = -
_ C -
- CO
- -
-0 Nt
- CO
0 -
- 0-
o- -
_ CD _
_ C
- o_
•-
a
- -
a,...
_ . _
,..
o
la
... I -
——
0 N
)_
CO
03 LC1)
,
u) 11 g A a
0
Lu _
., co
A-.
,- •:1-
- CL
3 ci IP
a 0) 8:. iiiilli 0
o ,,
NIIII7 _
. co a) v.
,, ? _-.6.--.4,ith.i. .
, ,; ,. 0 ....w.
. iiiiiillik.m.......__%.„.„74., a
3 c
ca. -
3 -
0 ' ia3 X _
- fki* 0_ vt
— , ,- —
. / X
, •,4-
ch, / ,-- 6 _
cp
7 75 / (Y?
Lo 0
0 -
Lo • (13 /'
0
- 0 a
— 0 0 a. / 0 -
- -
I -.......---
_ _
17; /
_
-
-
_
_ (-D -
c -
cl. _
-
0
_ ,.... _
00 0 -
L
'i= b
a 1; -
a
as -
a 1 , , , , Iiiiiii , iii , , , , IiIIIIIiIIIIIIIIII , III , , , IIIiiiiiiiiiiiiIIIIIIIIIII , ,
tsi
9 (uimsn 0099) 6umpoN
s-
AC Flipbook
• •
O 0 O 0 0 O O
in in d- m 0 0 0 0 0 0 0 0 0 0 0 o rn oo �n d- rn
'Kt' .0 00 0 N d' CO d- N 0 CO O d' N. 'r,',- O- O O a' rn N
N N N M r\ M r rn d" Ln 'D N. N. CO 0, ems- — N N
0 r 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Ln Ln d- rn N `- 0 0 0 0 0 0 0 0 0 rn 00 r\ in d- rn
d co 0 N d' kD CO d" N 0 00 �0 d- N N. r O' � N.
N N N rr\ M rr1 M M d to k.0 N. N. 00 O\ 0 rn d- .O CO N
x—
O
88 -- 0
a N
,,,,,, LL LL
obob
x3333 /
p V e 0
V
p 0
EV
E Vob
n
O N _--r 0
to z8888 t^
A-9 ''''31`3'g"
i mi ig r
. jirVVVV
Z Z za,a,d
x 3 3 3 3
i!m00
O O 0Oa cav q) i \
E
l'ir At 301-rOlWAilefe*' ''' ,
._t,'L's‘ 10 OT# 4,,(416)1°.
% ' ��', �V
Po
I-- •kr O
(Y1 ry
om / O
m
• rrl N
r- O
L1 O N
M i r M
O O
N O O 01 00 00 O O O O O N �i� A
N (I)
O E- < moo q) Ch ICT in in in �.n �.n 1- .�. E
I
rr� N'1 d' N 00 00 In to in V1 V1 M M
Q 0 N N N M .- .- d- d' d' d' d' M rn 4
M M rn M re) in
•
V 0 0 0 M a1 00 O- O� O' O� N d' 00
O
LA d' d' d' M n o0 N O'� a IA O
�. in co O
N N N- N N N. mrdnd- 7 �d- �d- � LnN
r ‘- c- r N
0 ,
• _
d' O O O O O O O O o O O O 0 O 0 O co r.,. Ln O M 0 O
Ln t_n d- rn N ,- o O o 0 0 0 o O N rn m rn v, fn rn
Cr VO CO 0 N Cr 'O 00 1/4O d N 0 00 d
N N N M M rn M M d Ln 'O N r\ 0o 0 - -- N N
0 Cr 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
in Ln d- M N0 0 0 0 0 0 0 0 0 O� 00 N. Ln d- M '-
Cr �O 00 0 N d- CO l0 Cr- N 0 00 VD Cr N N. M 01 '- N. M
N N N M M M M M d" Ln q) N. N. CO 01 0 M f VD 00 d, N
•
0
k.k LL
75111 11
66
p
V V V
D��
8`< t'
VU
2��
SaoV V
0
X33.
to m o00
in
o m
m0000 r-
3 3 3 3
Z o 0 0 0 0 0 0
vel V V V V V V V
:MUM
0
0 O O (----
0 O O °C)_
o
2-.,i, \ ,)
X v )\\
'
Fpn_ til 1
3 N
� P • o
mo
O \ in
O o
/o
O o
.-� O
iio N
/i O N N
0 0
N 0 'N0 `O O1 00 00 0 0 0 0 0 N cp >'
O I— Q rn co rn rn Ln Ln in Ln Ln 7
rn r-, d- N co 0o Ln Lt.)LLr u �n M M
Q O N N N rn 1- N- Cr Cr Cr Cr Cr rn" CO
M rn rn M rn
V • 0 0 0 0 rn d- n a1 V1 V1 n N- O
O 0 0 0 rn O, 00 1- a, o' a N d- 00
0 Cr Cr CrrnN. oo N C\ (3• oa �no
; � .
O in o0 0 0 in N 0 — rn d- d- 0
M N NN N N rn M d- d- Cr- .-- Ct 1.11 N
,- c- e- N
✓ LL( dr m NN 0 0 0 0 0 0 0 0 0 0 0 rn o00 L M y o
d- lO 00 0 N d' k.O 00 �0 d- N 0 00 '.0 d- N - rn N Ln N. rn N
N N N M rn rn rn rn d- Ln l0 I� N. CO N �O - - - - 00 - N N
O d- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Ln Ln d- rn Nr_ 0 0 0 0 0 0 0 0 0 N 00 N. Ln d- rn 7
d" 1/4..000 0 N d' `O CO k.0 d- N 0 00 k.0 - N N. rn N Ln N. M
N N N rn rn rn rn rn •cr in kr) N. I. 00 N o 1- rn d- .O 00 0'•' N
0
M
z 0 — ` -,,_
0
LL 7
qj \_
_ oaoo �.
X 3333 N
0 0 0
V
D 0
o
''z'
E o 0
h
V V O
X33
m
t
maaao "
.n v u
x 3 3 3 3
i66666^66
a —
0 0 0 0 0 0 o a
�/1 V V V V V V V
v n "
O
OO O O O O O 00
i O
O 00
1
z 2
to x
x<
0
O
mN
i-
m i
z M O
L
O O O
O O
.- O 0 N
N
G. O 0 o
N0 1 enQ
N 0 �O N N o0 co 0 0 0 0 0 N (7,
0 Q rn 00 Vl \O N Ol Ln in in in in 7 `l
in (Y\ d- N 00 00 Ln in Ln Ln '- N rr
LA 0 N N N rn d- d d- d' d'" M cr) CO
0 0 rn rn M rn rn Ln
V O 0 0 0 0 m d- N. N Ln in Ln N. N. N
0 0 0 rn N CO 7 N N N N d' 00
O rn Ndn 00 N N N N n O
0
0
N N N rn en d' d- N
N
,— r- r r- r- N
0 •
00
0 0 0 0 0 0 O O 0 0 0 0 O O 0 O co if\ O M 0O
Ln in M N r- r- 0 0 0 0 0 0 0 0 N M Lnr, r 1 a'
.CD 00 0 N • O t" ' 00 .O d' N 0 CO d
NN
N N N M M M M M Ci" in 'O N. N. 00 a' —
,' M --N N
0 Cr 0 0 0 O 0 0 0 0 0 0 0 0 O O 0 0 0 0 0 0 0 0
1.n Ln .t- rn N 0 0 0 0 0 0 0 0 o rn 00 in a- M r'
d' q:,� 00 0 N qp 00 CJ- N 0 00 fit' N N M O' V\ N, M
N N N M M " M M 71-- in 'O t, I, co O1 0M d- 00 Q1 r71
,-- r- r r r'
O
v
.Y . \ N
Q Q Q Q
1�.1_ti LL u �\
F3333
0 V
0 0
V
0 rj
8 V
VV O'^
0 0 0 0
S'0000c ,,
\�"mmN \c c
N •NZ�a'a'a' \
,;,8,
a a o 0 0 _ \ 1
-- 0
vm
66666:46 \
� pm ,,, O
o " ttl 11,
E o O l ti�, n 0 0 CO
1
------. ----) N'-'•
K C
V 0 in p
0
" M N
oM O
M
0
O o \, / 71-
O �,
C. LA O NN
M
"1 O 1
o
N 0 'N 0 LO 00 00 0 0 0 0 0 N �i` co
(.J E. Q M 00 L1 k.0 0- 01 1-11 Ln is. Ln LI1
/1
M (Y\ �" N00 00 in in L/1tI
l Th lIl rNYI M
.L . 0 N N N M , ,- d- d" 'd- z J- 'C f m m E
M M M M M O
V • p 0 0 0 rn d- N. CYN Ln 1-n N. N. rn
0 0 o m a' 00 r' a N t 00
0 d- d- d Cr n 00
N a'
a1 a' a' Ln O
O or- 7rdA` NNNNM M d d" 01 Cr 1 N
•,-- x— r- r- r r N
• •
O O O O O O O O O O O O O
I
0O
Ln cr mo O N aN
M O� MO M , r,- N
N
1
O d' 0 0 0 0 0 _0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
'd- �O o0 0 N . q) CO �O c1- 0 0 CO qO J- 0 01 00 C L.r\ d" n M
N N N M rn M m rn Ln 1O r r oo cp-\ 0 N- rn d- 'O CO rn N
0
0
`0 \''''>(:: k ,1/40.4 \VSNII\1111\k\,\ \ \,,' \ - 0,_:),,/,:/,,,.„,„ ,,,' ,04x1, 1 ,-Ni , ii ,
itii 111
,'‘' \f\‘\41\\/Cr) i
__
, , 00
ii, lii ,‘ ,
0 .
, \
4\\\\\ ' \ ‘ '14111k; 1
• I, 1 „, 11410\I 11 hIllikl2r4
:il. '''' 1410 li
TCI
- i kg1410 0 ,_
._
. . ,
. C7
11*1
re M ni
Lt1 1— p r.
N p o
CL `p N N
Nil
i eY1
N0 'N O lO G 00 CO 0 0 0 0 0 N ro
0 Q rn 00If) LO d> C1 Ln Ln Ln Lin `L c.�
' rr� r; d- ,,i op op Lf1 Ln L!1 L(1 LA m m
Lin
O N N N M .- N- 'd- Cf' Cr" d' 'I" M M N
rrl M M rn rn O
V O C O Q O O M I. O\ 1 I'1 I\ 01
0 0 0 rn 0, 00 0L/ 0Lr• 0 LJ1 N d- 00
0 c 4 4 4 M 06 rn 0 Ln o
1 N
Lrt in co 0 0 L1ON rn' rn 't" d"' isl O
M N N N N rn rrl '71-- d" �- Ln rn r
v.. r r r- r c- r N
• •
d- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 i inm 0 o
in V1 d M N r r N n rY\ 01 V 1 ;_•., f� rn 01
d- .O 00 0 N Cr .0 00 •0 Cr N 0 00 d
N N N M rn M M M d V1 .f) I� N. co 0r , M d N N
l
0 d- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Ln in d- rn N ' r 0 0 0 0 0 0 0 0 0 a CO N. Ln d- M r
d' .fl 0o 0 N d' S 00 l.0 d- N 0 CO .O d- N. M a
N f1 N. M
N N N M M M M M d' LI `0 N. N. CO O\ 0 M d- .0 C7\ j
r r r r r r
0
6\
- � O
0 `\ e--
¢m LL LL
�
Xto
111333
O
X13
m Zo C o 8
am�m�m�00p1
,;“.L,:„: ;
a T T 1 d m m
2 a a a 3 3 3 3
o 0 0 0 0 0 0 % \
Z0000000 \ /^
vii V V V V V U V \
0 0 0 P Pap
O
fit
`7,7.:4
n P P 00 �.___.__......
ddN
N N P�;O P
d C n
p n /
E$ o o 9',m , \
s?�nnn�Ov O O O O O O O
O
O o0
E 7
Z"`
43
X c
k"
UO
V p m P O
pP O
ON
pQ O\� / O
O 4. m - o N
V" O .fl
e— O N O o
G. N _ rel
N '
O 0
N 0 •N 0 .0 N. rn 00 co 0 0 0 0 0 N �ias
O E-- < r!1 0o .0 rn O Lr, Lr, Ln 1r, in r �-
IM rn 7" N 00 00 in •in in Ln Ln rNn N
LA 0 N N N M r r d- Cr d- d-' d" o
0 0 rn M M MMM M
.-
VQ 0 0 0 M d- N. C' Ln in in N. N
O 0 0 0 M
oNCO c o rn N d- oo
O • N ' •00
- �- d- rr) I00 o � a\ CCLr, 0
LA
r
tztILA N N N N. Cr)rrm fid-' 1- 7r- N
I'mr r r r r r r N
• 0
ConocoPhillips(Alaska) Inc.
-WNS
Western North Slope
CD5 Alpine West Pad
Rig: CD5-02
501032073700
Plan: CD5-02
Plan: CD5-02wp11
Error Ellipse
Survey Report
03 May, 2016
• S
SLB
Error Ellipse Report
Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-02
Project: Western North Slope TVD Reference: CD5-02:34.1+36.81 @ 70.91usft(Doyon 19)
Site: CD5 Alpine West Pad MD Reference: CD5-02:34.1+36.81 @ 70.91 usft(Doyon 19)
Well: Rig:CD5-02 North Reference: True
Wellbore: Plan:CD5-02 Survey Calculation Method: Minimum Curvature
Design: CD5-02wp11 Output errors are at 1.00 sigma
Database: EDM Production
Survey Tool Program Date 5/3/2016
From To
(usft) (usft) Survey(Wellbore) Tool Name Description
100.00 600.00 CD5-02PB1 Srvy 1-SLB_NSG+MSHOT( GYD-GC-MS Gyrodata gyrocompassing m/s
662.12 2,360.57 CD5-02PB1 Srvy 2-SLB_MWD+GMAG( MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC
2,460.02 2,454.00 CD5-02PB1 Srvy 3-SLB_MWD+GMAG( MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC
2,454.00 3,923.99 CD5-02wp11 (Plan:CD5-02) MWD MWD-Standard
2,423.99 14,619.95 CD5-02wp11 (Plan:CD5-02) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC
14,619.95 16,119.95 CD5-02wp11 (Plan:CD5-02) MWD MWD-Standard
14,619.95 22,900.89 CD5-02wp11 (Plan:CD5-02) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC
Position uncertainty and bias at survey station
Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semi-major Semi-minor
Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool
(usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (°)
2,454.00 53.78 23.30 2,206.72 2.02 -0.29 4.47 -0.02 1.29 0.59 0.67 4.50 2.30 15.73 MWD(1,3)
2,484.00 53.01 23.86 2,224.61 2.05 -0.28 4.66 -0.01 1.29 0.59 0.68 4.69 2.31 16.20 MWD(1,3)
2,504.00 52.68 24.57 2,236.69 2.07 -0.27 4.78 -0.01 1.31 0.60 0.69 4.82 2.31 16.48 MWD(1,3)
2,648.03 52.83 30.45 2,323.91 2.32 -0.28 6.27 0.08 1.48 0.66 0.79 6.40 2.39 20.42 MWD(1,3)
2,703.33 52.96 32.69 2,357.27 2.32 -0.28 6.27 0.08 1.48 0.66 0.79 6.40 2.39 20.42 MWD(1,3)
3,252.65 64.69 19.10 2,642.11 3.20 -0.48 12.20 0.50 2.54 0.81 1.13 1223 2.82 2329 MWD(1,3)
3,257.94 64.81 18.98 2,644.36 3.20 -0.48 12.20 0.50 2.54 0.81 1.13 12.23 2.82 2329 MWD(1,3)
3,767.60 64.81 18.98 2,861.31 4.80 -0.48 18.77 0.56 4.07 0.94 1.40 18.79 3.31 21.80 MWD(1,3)
5,933.12 64.81 18.98 3,783.11 6.31 -0.45 18.94 0.03 5.56 1.62 2.87 18.94 3.80 19.53 MWD+IFR-AK-CAZ-SC(2,3)
6,41448 64.81 18.98 3,988.01 7.13 -0.45 21.45 0.03 6.32 1.80 3.30 21.45 4.10 19.47 MWD+IFR-AK-CAZ-SC(2,3)
6,478.85 64.81 18.98 4,015.41 7.13 -0.45 21.45 0.03 6.32 1.80 3.30 21.45 4.10 19.47 MWD+IFR-A4CAZ-SC(2,3)
6,640.01 64.81 18.98 4,084.01 7.47 -0.45 22.45 0.03 6.63 1.88 3.49 22.45 4.23 19.45 MWD+IFR-AK-CAZ-SC(2,3)
7,343.14 64.81 18.98 4,383.31 8.83 -0.45 25.99 0.03 7.70 2.17 4.16 25.99 4.68 19.39 MWD+IFR-AK-CAZ-SC(2,3)
10,212.50 64.81 18.98 5,604.71 13.53 -0.45 40.81 0.03 12.17 3.61 7.54 40.81 6.68 19.26 MWD+IFR-AK-CAZ-SC(2,3)
12,058.77 64.81 18.98 6,390.61 16.59 -0.45 50.06 0.03 14.95 4.71 10.12 50.06 7.97 19.21 MWD+IFR-AK-CAZ-SC(2,3)
12,059.00 64.81 18.98 6,390.71 16.59 -0.45 50.06 0.03 14.95 4.71 10.12 50.06 7.97 1921 MWD+IFR-AK-CAZ-SC(2,3)
12,568.08 64.81 18.98 6,607.41 17.44 -0.45 52.63 0.03 15.73 5.05 10.91 52.63 8.34 1920 MWD+IFR-AK-CAZ-SC(2,3)
13,179.35 64.81 18.98 6,867.61 18.47 -0.45 55.72 0.03 16.66 5.47 11.89 55.72 8.78 19.19 MWD+IFR-AK-CAZ-SC(2,3)
13,293.53 64.81 18.98 6,916.21 18.64 -0.45 56.23 0.03 16.81 5.54 12.05 56.23 8.85 19.19 MWD+IFR-AK-CAZ-SC(2,3)
13,428.87 64.81 18.98 6,973.82 18.86 -0.45 56.90 0.03 17.01 5.63 1227 56.90 8.94 19.19 MWD+IFR-AK-CAZ-SC(2,3)
13,517.98 65.73 16.22 7,011.11 19.24 -0.86 57.27 1.04 17.27 5.75 12.56 57.52 9.07 19.16 MWD+IFR-AK-CAZ-SC(2,3)
13,690.70 67.64 10.98 7,079.51 19.51 -1.14 57.24 1.63 17.43 5.81 12.72 57.85 9.14 19.12 MWD+IFR-AK-CAZ-SC(2,3)
13,907.81 7028 4.60 7,157.51 20.31 -2.09 56.38 3.35 17.91 5.98 13.19 58.86 9.35 18.88 MWD+IFR-AK-CAZ-SC(2,3)
14,273.36 7520 354.33 7,266.19 20.74 -3.15 54.47 4.98 18.40 6.11 13.61 59.88 9.58 18.48 MWD+IFR-AK-CAZ-SC(2,3)
14,287.63 75.40 353.94 7,269.81 20.74 -3.15 54.47 4.98 18.40 6.11 13.61 59.88 9.58 18.48 MWD+IFR-AK-CAZ-SC(2,3)
14,548.47 79.20 346.92 7,327.21 20.69 -425 51.67 6.52 18.91 6.20 13.97 60.89 9.85 17.91 MWD+IFR-AK-CAZ-SC(2,3)
14,602.19 80.00 345.50 7,336.91 20.69 -4.25 51.67 6.52 18.91 6.20 13.97 60.89 9.85 17.91 MWD+IFR-AK-CAZ-SC(2,3)
14,619.95 80.55 345.50 7,339.91 20.58 -4.36 51.77 6.50 18.90 6.20 13.97 61.03 9.81 17.93 MWD(2,4)
14,639.95 80.55 345.50 7,343.19 20.58 -4.36 51.92 6.44 18.90 6.20 13.97 61.15 9.82 17.86 MWD(2,4)
14,849.95 87.02 345.50 7,365.91 19.35 -5.65 53.55 5.80 18.92 6.23 13.90 62.51 10.02 17.01 MWD(2,4)
14,94927 90.00 345.50 7,368.49 18.94 -6.23 54.37 5.49 18.94 6.23 13.85 63.19 10.18 16.59 MIND(2,4)
15,395.47 90.40 332.12 7,366.93 19.07 -6.30 49.68 6.37 19.11 623 13.48 66.23 11.42 14.29 MWD(2,4)
22,900.89 90.38 332.12 7,315.91 24.00 -6.30 73.85 8.96 24.03 6.18 20.13 82.80 24.50 0.38 MWD+IFR-AK-CAZ-SC(3,4)
5/3/2016 11:04:48AM Page 2 COMPASS 5000.1 Build 74
Pool Report
0 •
c5-02wp11 Surface Location
f t �, - I i� 4 .
CPA:In ,_oordinate Cont.e.° �
From: To:
Datum: NAD83 .+1 Region: lalaska Datum: 3NAD27 Region: lalaska +'
r1. Latitude/Longitude Decimal Degrees ..r.! C_ Latitude/Longitude Decimal Degrees +1
y C UTM Zone: ) r South C UTM Zone: True r South
4' State Plane Zone: �� Units: rus-ft f State Plane Zone: True Units: us-ft _+
r Legal D e:criprion(NAD: �,, l'i Legal Description(NAD27 only)
Starting Coordinates: — — Legal Description
X: 11489553.29
Township: r-----
101 l -141-;11 Range: J 004 JE zal
Y: 15965656.28 Meridian: j "T Section:118
FN L -i 1298.41984 1 FE L H 2459.0287
Transform Quit Help
graiLir - -- -
5-02wp1 1 Kick-off Point
nCPAI uoc dinate Converted '` °'wtx -,-,=.1.3.'.-.F.:--„:f-:,-;-11=4„ ',,4.=-:,'-.a",. .a :.j �� Imo*:-: `
From: T o:
Datum: 11.4461181811-11-111-1,1 Region: lalaska ...7.1 Datum: NAD27 +` Region: alaska
C Latitude/Longitude Decimal Degrees Latitude/Longitude Decimal Degrees Tri
r __._____
UTM Zone: ( F- South C UTM Zone: True (- South
C+ State Plane Zone: 114 + Units: bus ft State Plane Zone: 1True + Units: us ft
C Legal Description(NAD27 only) C+ Legal Description(NAD27 only)
-Starting Coordinates: Legal Description
X: 11489774.12 Township: 011 N Range: 004 E
Y: 5966408.32
Meridian: lu - Section: ?
FE-1.3 4822.0187 FEL + 12250.3581
Transform i Quit I Help
0 nentarmeasumasverms
0 •
c 5-02wp11 Intermediate Casing I
x _ E k.
CPA: Coordinate Converter 1" ? -- M'`
From: __ To:
Datum: 'NAD83 Region: lalaska Datum: NAD27 Region: alaska 2.71
1- Latitude/Longitude Decimal Degrees C LatitudelLongitude !Decimal Degrees L'J
UTM Zone: € — j-` South C UTM Zone:
True r Southco
State Plane Zone: F� Units: us-ft . C State Plane Zone: 177u7-"E Units: 1-11,;11-1;"
_ t_c�s�l 0e-_:cription[NAD 27 onlyi ( Legal Description(NAD27 only)
Starting Coordinates: Legal Description
X: 1493295.96
Township: 1012 N ±I Range: 004 E�
Y: 5976757.03
Meridian: U ,I1 Section:132
JFNL J [4964.8238 FEL ' k175.8789
Transform Quit Help
5-02wp11 TD
In CPA:Coordinate Convert .1'1c_` i '--1
... •.<.s :; 4 ,y n., 3 ,, e ate.';`, k,e7,„ �+ %'tx,�
From: To:
Datum: pp83 Region: alaska Datum: NAD27 Region: Ialaska I
Latitude/Longitude Decimal Degrees C Latitude/Longitude Decimal Degrees
UTM Zone: I r South <"" UTM Zone: 'True E South
( State Plane Zone:IT---D, Units: us-ftmalC State Plane Zone: True Units: ius-ft 7
'
C Legal Description?)NAD27 onM 1`+ Legal Description(NAD27 only)
, j
. -Starting Coordinates:------- Legal Description -- —
i X: 11489692.38 ---
1489692.38
Township: 1012 iN ,' Range: 1004 E
Y: 15984196.78 Meridian: IU � Section: ip
FNL 12877.2580 FEL 2619.5928
Transform Quit I Help
fie. N O F
c. 4
o 4 _ i
p °
s ! J / 3
s
//,
O
�j •cI O
4 c4
CS) 0124(
t OJ P
OJ OJ
a IMO
O
Z BS�Ps {c' ' J O
M w
�� �c, t 03• .1111111
E, C3=3111 CV
S) V c)a8OJ (.1
�mwm N CI
oM�M�o oo i
w4m r 2
c,
2 58 a
m� O cx O
m
ct
i' , )0
00000
0000a
NNNNN
.panno C/1
ZUUUUU O
BOJ 0 O =
• a- O
sp o m O
J
.t *.117 O
CI
til) / O 74.
` CO
O z.• U)
` W
m
o^
c':,. J N
) ,,.,.,.._ }
r
o
pi ./.... o
N 2 o
Oco
i
to N
Veas0CDO
O
a .O
O
O
07
0
M 1 I I I
O O O O O O
01 O O O O O O
O O O O O O
N N( ui/4911 000£) (+)tfi oN/(-)gTnS
0 •
O
O
O
LO
N-
N
Q kg-
O
Z O OO
L 0
❑ N O m._00o
$ aa N
2
U
L--] mcnr, o O
r°
c
O
0000m
No moo`8 E ^�.
44;41v No;N O O •—
coa
'Ann cp
�00000 O �/�
ZUUUUU V/
0
'so
v OO
;
C • M
V 4. Oa..+
t W
�G p
sj J
O • N
•
O CD
CD
} rto
0O
•— O
CV 2 O
cr)
Lo CD
U CU
OJ CD
O
O
O
O
0
O
0
O O O O O O
co O O O O O O
O O O O O O
N N (ui/}MS" 000€) (+ 1-1oN/(-)u4rS
O
O
O
LO
oaao co
s ,soM i' O
0
d --__ N
8
w
J!h
��
O
0yy 0 3 0)
HpJ
/—
E,tai ooa.�i o O I
c.
oo
NNNNN
Oo
O
00000 a \ TTT ik
o
!i� LJ.I
s°/ u)
o
r
Q A.
o
.— O
O ct)
1 L
1.0 CD
+11
0 L
U C4 O
— O
co
O
O
O
O
CD I5
CV
T Q Q O i --
(ui,q4stt
OS
0000) (+)q oN/(-)u1 S rn
0
0
—o
03
CD5-02wp11
-N901 901
,. CD5-03 0
- O
ice —
C 1 M O(p
O rIii00
V VL-Za0_
W -- I, 1100
I
I O
COCD
—O
0 '
a) ,►ZT000
Q CD0
-900 1 coM
O
O c0
—O
C
BC�Z�'_ap .a 6003 r 0
U 1 >' a)
> ` 0\0To
= di `
N , 7010 O)
TT; U — C� x O
D CO J . \` i ` � O
13 ToQ. • ,I� & ,010 ti N--
CO Y Y _.I 1• ` `
Tmmi Y
1 1 •
T"'
1000
CD5-04
Po' CD2 Z8 O
0
N
O
CD2-751-
,
0
0 o
0
0
7
O o 0 0 0
CD LO 0 ►n o
O) O N M
co y}daa je3!peA awl_
Ar
E
W
a
0
.j
•
Q ❑
U
M
I
E{
E
E
I
c
CO
•Tim
0
p_
CIN
O -
Q U
m
r
N
FLN
m -g U
Y
In
N
.0 ..........................
II /
N
s
\-m
(1100)
Q s
m
a
l
..................... ' ---' —
9 - -
ii
A
Or
o m
0
II
.
m --
N_, U ❑
c
, � Q ❑,
.." si.s.s.................................................
ii
11
t v"wri+r 1
N
N
0
I
ilLC) 11
.
. ' ' . .. ...
Q N^
........... n ani -... '
3 m
m
ire ........
CD i U
E -
• N k�A
U
0
I
M
N
.
N ----B....__
a
N
N
I
-
• •
Tollerable Collision
Risk
:�, sp;:'''''''''''' -a;-s `°.. �iv�.� „� ,,,
g �;»°s` ..� .ro, „,,, ,„, .... ,#6a t'4� lis ,�a
„, ,
..,.
„„
Incomplete
As - built
REV DATE BY CK APP • DESCRIPTION REV DATE BY (.n APP DESCRIP110N
1 4/24/15 CZ DB C.A. UPDATED PER K150003ACS
ALPINE SATELLITE DEVELOPMENT c-,-, ; 1
LOCATION OF 1 k LOPi
. - it
THIS SURVEY do
`� f
CD-5 �: T11 N
hAt.P. '
PAD a �"���-
CD4 TO ALPINE l D Mr/Mt
CD5 ACCESS ROAD o
N CD!
m,.... .,,, ,t ,,____
4 ---wi.-- -----ur ', 41 iiir
-0.":,,, Ilik 4,4, ", i
4
cn
Z Do 0< CD1 =1RE lars
'.1
ila
VICINITY MAP NOT TO SCALE
LEGEND:
O PROPOSED CONDUCTOR
• EXISTING CONDUCTOR
SECTION 7, T. 11 N., R. 4 E., U.M.
SECTION 18, T. 11 N., R 4 E., U.M.
CD-5
Ov�pER OF PPp ��oo aI, PAD
SN o
pEs\CN osS�°� �\ o0o;,,e.".
002,07,0u\' ‘ ‘ ,,!--%-_-, t1 -
nAg�s�`P� 1x yf!AWN •• ••a • .
T1' ;,. 0'2,,,5"" •!1 - . - - - \ : ,
0.0'3 . .••
PLANT �_-----`
N N
a
15'4152' -p Cil
'O —1
--...0__
�O
ZT
KUUKPIK
UMIAQ
ALPINE SURVEY OFFICE
PHONE:907 6744739
yV ALPINE MODULE:CD50 UNIT: CD
ConocoPhi I lips ALPINE PROJECT
CD-5 WELL CONDUCTORS
Alaska, Inc. AS-BUILT LOCATIONS
CADD FILE NO. DRAWING NO: PART: REV:
15-03-02-1 04/18/2015 CE-CD50-1025 1 OF 3 2
REV DATE BY CK APP • DESCRIPTION REV DATE BY Cr. APP DESCRIP110N
1 4/24/15 CZ DB C.A. UPDATED PER K150003ACS
ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC. 18, T 11 N, R 4 E, U.M.
SEC.LINE 0/S EXIST.
WELL 'Y' 'X' LAT.(N) LONG.(W) FNL FWL GND PAD
C05-x01 5,965 661.64 ,489,572.44 ' 70' 8' 49.155" 151' 3' 21.378" 293' 2489' 27.6 34.1
1 I Cox l ,489 553.770' 8_49.0-97- 151'_x'- 299' 2470' 28.1 34.1 -1
CD5-x03 5,965,650.92 ,489,534.00 70' 8' 49.042" 151' 3' 22.493" 305' 2451' 28.4 34.1
CD5-x04 5,965,645.24 ,489,514.77 70' 8' 48.982" 151' 3' 23.051" 311' 2432' 26.6 34.2
CD5-x05 5,965,639.80 ,489,495.46 70' 8' 48.925" 151' 3' 23.611" 316' 2412' 28.1 34.3
CD5-x06 5,965,634.56 ,489,476.20 70' 8' 48.870" 151' 3' 24.170" 322' 2393' 27.7 34.3
CD5-x07 5,965,629.08 ,489,457.08 70' 8' 48.812" 151' 3' 24.724" 328' 2374' 27.9 34.3
CD5-x08 5,965,623.88 ,489,437.69 70' 8' 48.757" 151' 3' 25.287" 334' 2355' 28.1 34.3
CD5-x09 5,965,618.27 ,489,418.53 70' 8' 48.698" 151' 3' 25.842" 340' 2336' 27.3 34.2
CD5-x10 5,965,613.12 ,489,399.13 70' 8' 48.644" 151' 3' 26.405" 345' 2317' 28.1 34.1
CD5-x11 5,965,607.66 ,489,379.85 70' 8' 48.586" 151' 3' 26.964" 351' 2297' 27.9 34.1
CD5-x12 5,965,602.23 ,489,360.56 70' 8' 48.529" 151' 3' 27.524" 357' 2278' 28.0 34.1
CD5-x13 5,965,596.59 ,489,341.43 70' 8' 48.470" 151' 3' 28.079" 363' 2259' 26.1 34.2
0D5-x14 5,965,591.36 ,489,322.33 70' 8' 48.414" 151' 3' 28.633" 368' 2240' 27.6 34.2
CD5-x15 5,965,586,10 1,489,303.11 70' 8' 48.359" 151' 3' 29,190" 373' 2221' 26.8 34.2
CD5-x16 5,965,580.48 ,489,283.58 70' 8' 48.300" 151' 3' 29.757" 380' 2202' 27.6 34.0
CD5-x17 5,965,575.11 ,489,264.31 70' 8' 48.243" 151' 3' 30.316" 386' 2183' 27.7 34.0
CD5-x18 5,965,569.79 1,489,245.23 70' 8' 48.187" 151' 3' 30.869" 391' 2164' 27.7 33.9
CD5-x19 5,965,564.42 1,489,225.90 70' 8' 48.131" 151' 3' 31.430" 397' 2144' 28.0 33.9
CD5-x20 5,965,558.96 1,489,206.70 70' 8' 48.073" 151' 3' 31.987" 403' 2125' 25.8 33.8
CD5-x21 5,965,553.51 1,489,187.22 70' 8' 48.016" 151' 3' 32.552" 409' 2106' 27.8 33.8
CD5-x22 5,965,548.14 1,489,168.15 70' 8' 47.959" 151' 3' 33.105" 415' 2087' 27.7 33.7
CD5-x23 5,965,542.72 1,489,148.81 70' 8' 47.902" 151' 3' 33.666" 420' 2068' 26.4 33.7
CD5-x24 5,965,537.42 1,489,129.64 70' 8' 47.846" 151' 3' 34.222" 426' 2049' 28.0 33.7
CD5-x25 5,965,532.01 1,489,110.28 70' 8' 47.789" 151' 3' 34.783" 432' 2029' 27.7 33.7
CD5-x26 5,965,526.59 1,489,091.09 70' 8' 47.732" 151' 3' 35.340" 438' 2010' 26.3 33.7
CD5-x27 5,965,521.20 1,489,071.88 70' 8' 47.675" 151' 3' 35.897" 444' 991' 27.5 33.7
CD5-x28 5,965,515.81 1,489,052.48 70' 8' 47.618" 151' 3' 36.460" 449' 972' 27.4 33.6
CD5-x29 5,965,510.40 1,489,033.34 70' 8' 47.561" 151' 3' 37.015" 455' 953' 27.6 33.6
CD5-x30 5,965,504.97 1,489,014.02 70' 8' 47.504" 151' 3' 37.575" 461' 934' 25.3 33.6
CD5-x31 , 5,965,499.57 1,489,994.73 70' 8' 47.447" 151' 3' 38,135" 467' 915' 26.6 33.6
CD5-x32 5,965,494.13 1,488,975.45 70' 8' 47.390" 151' 3' 38.694" 473' 895' 26.8 33.6
CD5-x33 5,965,488.75 1,488,956.35 70' 8' 47.333" 151' 3' 39.248" 478' 876' 27.0 33.6
NAD 83
NOTES KUUKPIK
1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE
4, NAD 83.
2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL ALPINE SURVEY OFFICE
(B.P.M.S.L.) PHONE:907 6704739
ALPINE MODULE:CD50 UNIT: CD
ConocoPhillips ALPINE PROJECT
CD-5 WELL CONDUCTORS
Alaska, Inc. AS-BUILT LOCATIONS
CADD FILE NO. DRAWING NO: PART: REV:
15-0.3-02-1 04/18/2015 CE-CD50-1025 1 of 3 2
REV DATE BY CK APP DESCRIPTION REV DATE BY I APP DESCRIP110N
1 4/24/15 CZ DB C.A. UPDATED PER K150003ACS
NOTES:
1. ALL COORDINATES SHOWN ARE ALASKA STATE PLANE, ZONE 4, NAD 83.
2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL. ORIGINAL GROUND
ELEVATIONS WERE DERIVED FROM THE AVERAGE ELEVATION ALONG THE TOE OF THE CD-4
GRAVEL PAD.
3. BASIS OF COORDINATES: ALPINE PERMANENT CONTROL MONUMENTS PER SURVEY BY
KUUKPIK/LCMF, JUNE 2013.
4. DATES OF AS-BUILT SURVEYS: WELL CONDUCTORS CD5-X12, CD5-X13, CD5-X14, CD5-X15,
4/10/15, FB 2015-12 PGS 4-7, 9; CD5-X01 THRU CD5-X11, 4/17/15, FB 2015-10 PGS.
49-52; CD5-X21, 2/29/16, FB 2016-03, PG. 59; CD5-X16, CD5-X17, CD5-X22, 3/4/16,
FB 2016-03, PG. 69; CD5-X18, CD5-X19 & CD5-X20, 3/5/16, FB 2016-03, PG. 75;
CD5-X23, CD5-X24, 3/11/16, FB2016-05, PG. 30; CD5-X25, CD5-X26, 3/12/16,
FB2016-05, PGS 34-35; CD5-27 THRU CD5-30, FB 2016-05, PGS 38-39, 3/13/16;
CD5-X30 THRU CD5-X33, 03/15/16, FB 2016-05, PG. 53.
SURVEYOR'S CERTIFICATE
I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED
ALASKA, THAT THIS
.O F, ALA S 414. TO AS-BUILT PRACTICE
REPRESENTS RAEYING IN THE SURVEY MADE BY STATE
MEEFOR UNDER MY DIRECT
•
• G '' 9 /1� SUPERVISION, THAT THE MONUMENTS SHOWN HEREON ACTUALLY EXIST
♦ AS DESCRIBED, AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE
• *'49th • CORRECT.
• 0 DATE: REGISTRATION NO. LS-5077
•• teDonald G. Bruce o:
•A�p FP No. LS-5077 r
KUUKPIK
UMIAQ
/�LF'INE SURVEY OFFICE
PI IONE:907-6704739
ALPINE MODULE:CD50 UNIT: CD
ConocoPhil lips ALPINE PROJECT
CD-5 WELL CONDUCTORS
Alaska, Inc. AS-BUILT LOCATIONS
CADD FILE NO. DRAWING NO: PART: REV:
15-03-02-1 04-18-2015 CE-CD50-1025 1 OF 3 2
• S
Häagen
azs
Necessary Plan Request (NPR)
Incomplete
• •
Loepp, Victoria T (DOA)
From: Earhart,Will C <William.C.Earhart@conocophillips.com>
Sent: Thursday, May 05, 2016 10:29 AM
To: Loepp, Victoria T(DOA)
Subject: FW: CRU CD5-02A(PTD 216-068)
Attachments: CD5-02A Quarter Mile Plots.pdf; CD5-02A AOR 5.5.16.xlsx
From: Earhart,Will C
Sent:Thursday, May 05, 2016 10:24 AM
To: 'Loepp,Victoria T(DOA)' <victoria.loepp@alaska.gc >
Subject: RE: CRU CD5-02A(PTD 216-068)
Victoria,
As mentioned on the phone, below are the responses to your questions.
1. Max formation pressure for sidetrack is 3250 psig.After experiencing losses at the reservoir during the CD5-02
penetration,the high pressure case was proven false removed in the reservoir modeling.
2. Well CRU CD2-78 has been minor risked via the TCR process by ConocoPhillips.The well is currently shut-in and
fluid packed and will remain SI until the rig releases from CD5-02A.The AC failure point is at the toe of CD2-78;
the lateral is unlined at this location.
3. Table and schematic attached.The intermediate cement job on CRU CD2-78 went well with full returns during
job. Sonic LWD log attached.
4. ConocoPhillips requests a packer setting depth waiver pending positive TOC results to set the production packer
>200ft above the productive zone.
Will Earhart
Drilling Engineer-ConocoPhillips Alaska,Inc
William.C.Earhart(a�conocophillips.con
ATO-1706
Office:+1.907.265.1077
Mobile:+1.540.448.1789
From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov]
Sent:Thursday, May 05, 2016 9:09 AM
To: Earhart,Will C<!JVilliam.C.Earhart@conocophillips.com>
Subject: [EXTERNAL]CRU CD5-02A(PTD 216-068)
Will,
1. Max formation pressure in ASP table is 3250 psig but listed on 10-407 as 3550 psig. Max form pressure for CD5-
02 was 3550 psig. Please clarify.
2. Anti-collision; CD2-78 fails major risk;what will CPAI do to mitigate risk? Will the well be SI during drilling or a
deep plug set?
3. AOR: CD2-78 falls within the 1/4 mile radius; please fill out attached table for this well
4. Packer is set>200' above production zone; packer depth waiver required
Thanx,
Victoria
1
Victoria Loepp • •
Senior Petroleum Engineer
State of Alaska
Oil&Gas Conservation Commission
333 W.7th Ave
Anchorage,AK 99501
Work: (907)793-1247
Victoria.LoeppCc�alaska.gov
CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation
Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged
information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended
recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to
you,contact Victoria Loepp at(907)793-1247 or Victoria.Loem@alaska.gov
2
• •
OVERSIZED DOCUMENT
INSERT
This file contains one or more
oversized documents. These
materials may be found in the
original hard file or check the parent
folder to view it in digital format.
• 411111
TRANSMITTAL LETTER CHECKLIST
WELL NAME: C75
PTD: a) 6 - OCS'
Development Service Exploratory Stratigraphic Test Non-Conventional
FIELD: U�tl f AINAr POOL: /t/►,I/6. 2 ac-, ✓'1' ��/� QJ/
Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter
CHECK OPTIONS TEXT FOR APPROVAL LETTER
MULTI The permit is for a new wellbore segment of existing well Permit
LATERAL No. , API No. 50- - - -
(If last two digits Production should continue to be reported as a function of the original
in API number are API number stated above.
between 60-69)
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole name ( PH) and API number (50-
- - ) from records, data and logs acquired for well
(name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample than 30' sample intervals from below the permafrost or from where
samples are first caught and 10'sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non-Conventional (name of well) until after (Company Name) has designed and
Well implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application,the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
• •
III 171
raN
O, °
a) a ,
N
N E co
C' c
E a) co' E
d M'
I,
m
cW
O c'
a d ay 0
O N' a' c , a) c,
c o 0
E 0 o, O; 0 3 ap '
�� Vi
0) 0 , .0 a), °
co' o 3' d, > 0
0, 0 -
'COU ' o' , � N C, V
L E, ; a a d ai $' 0
0 a y, E .
c O E `a co
0, o 01
o c 0 c0icil 4 E
3' O'
, ~, oOa) ; OC. ' d; , V"
w' , o ' 00'0 N 0 C C, a
U 0
COfd O �a 4 CO,M, d
Z a, - L a . aai 0 o 0
Z _, a m �' co„. as U, a, Q c aa)
o, •
W' C a U) o' O , 4-, N' N -r � � � L' a) 11 -0
W 'v N, T U 0) E O, V), N' a)
W LL' Z a) - c'CO, �' 'D' 0. m O' E LO CU 3 y a
5 o o, a. 0 °)' ; m o v a 3 M 0 M a CO -d co, -a, o'
Q c. 0' a CO'N3 0. E; o; 3. o �' '3, N 3 4 .0 )y
@ w o E' �' o �', v°)i Z c; m n a U, o 3'
ar
2 �' < > 2 C, � co' U; W OD y, ;d U@C co y, N' co, �'� �� _o,
Q � < N' IT, C, co , cV, 0, y W' -, C, , a) N• C' , O, M. 7. N- O d, t E
E O �� O. t, O. �p� t6 'C a)' O' o' -lV N CO a co C co,
E 0 ' Z; 0 �; m; m, ; 2 0 iu
0 3 0; 0 0 >' y m; =' € e y E a0i' CD. -�; 0
Z (17
oo, U y � o U v v g m' c\I' 8; 42' , a, E' c4 E' . ,, 0,
CD Z w' ce' 0 o O a) O, re' = 0 ,, o _rn 0, '8, m' a co'' 0 N' a o. c
W LL' 0 0 0 0 ' Q' 0 �' 0 U' U) a. E' a' < 2 2 2' Q' I. W. a 0
Q.
W
U)
U> q) N' U> V) U) N' U) V) U> U' U' tl) a) a) O V) 0 . U) 0. N' U)' 0. 0 U) ' U
Q' Q' a), a), co, a), co, a), a), a), a), a> co 0, a), a), o, <, < < o, o, a), a), a), co <, a), a), a), co, a), a), 0, o, a), < < <
a Z; z; >- >- >- > > >- >- >- } � >- >- >- >- z z, Z z z z, > > >- > z >- > >- > >- >- >- z, >- z z z
N ... T (U
E. 0,
O. o.
° Z C
75.0
Na a E
o , , � a); x U
, o•
o
v N
J_ 0 a Z, aai E' a, o, \mac
E_ Q, p 4) a. co CO 0 a). N O. U /
C'
ce O' O a) ... C' > '.' N, E, a, , y, O, 7, C, N �� f0 C co a) N,
M 3, I I O a3 0 y O, , U W N. a) , C. . 0 - ' O_ 3, , �� a. N. , u)
jo. °c-' 0' 7 � a) 'co . > S aji 0 -o ° 0 E aa) .co .= o; ,n' �' O' c• v')' co
re 0 o = t o c Z .co, co 3 ' CO C o C 0 c Q O' Q' U) O' 0' a) O
W Z .C' -O' O, N C l?' co a) a �' U C' a) CO. O O o a)' N a' y' �' C O O O Li
)
- M, E EH! a C, C E i° o, `) O � C C N, �^ ,«,� C O` �� C' +0-' �, C� a) L coOE N y' a C C
-_ q co o' o a 0 0p -o c 3' o m 0 ca 0, a 3 0, 0' co > °
Y Q' � �, U � 'O' U' a) �' N O O' O, C 7. V' .� a N O, a) a. • a) >' fa' Y .a)-
to a 0 0' 0, c o > > ° v � o 0 0 o E' �, �, T a c .
O g N :3• E °- c c. 0. - ' .' o o' a)' c• aa, m, m. a o Z' o - E' �' 3' a' o' a)' t m' 3' E
U 0' a m as' t L' a@ 0, a, �' c')' .A.- 0 0 4- CO, • a) O) Or a a 3 0' - o 3' c E
Q �, N, C' V ..0.. .@.,' f6 .,0., fa' @� 'O� a), N' -' C 2 M. V), a) O� N' o, C� o
o to o •c 0 o y a) a m, , . aa); m. m, :0 5 - 3 c o a 0 o, 0 ' �' . o; 3 -c 0 °' W U
O a a C ,� °O. °O. >� aa�), 'O -O, > > U' ° Q a). '°O. N. n O. co C, a, D: W. 3; a)
c 2 O' o� a a)' E a O' w �' �' c' `o' o' N E' 0 E w 0 0 c
- U N' O' a); a' O' 0 N 'CIL> O`' C C d C . N. C. O` o ra Y� a' N a, - O E. 0 0 ' N y; CC 0 CO,� 0
a') d a d d 0, O' a L' d ' O) m' a' 'a 3 'p' ,
S y ° ,6, E� O O, O. OS N' a W. Ula al . E. oI fa f0 co,NN' O O , a c, N O _
- m' a) 3' a) m i ci 0' 0' Y vi -' -- o 0 m = a y d
O O Of v' a) C' C, d d 0, N K N 4),
a 3, L a' C N N >, c. .0 a) a w yU O ° 9 ,91 T .O a)
E. 0 ' CO L, C C • N c0)', N' N. O O 0 O .� O, o' C O; ° lG C aC) c p m
U c' a) E. m' 0, 2, ,2 m o' 3 ° m m' 0 a m _ U 0 m U c
O > a 0 3, 8' mE. as. v' o, ° _ a •c :?' y. =' a E a •E c�
Z c, .. c ° 0 0 0 w O 3, a) o o, - m, v, m. -c v; 3 v,' a' 7, �a
N O U - 0, =, a o, o, - m m; -- -- a ° D,, a a' o, �, I. c w > c a a a 0. E .�, � c m �`
U o 0 a`°i' a) a) 0' z -00 a a �, m o a), 3, 2, o, 0' M, 2, M', m a, @ -o = O, o, L, 0 0 0 coa), 0, o, p
Yf z: a � D', 5' 5' S' co _ o o a. a; U s' Q' a U cn U O, U U' c, ; Q, 0,, m, m, 0,, ..', �,.=,, a; 0', CO, co,, 0,, _
- N N N N N N N N
w
N LJ
W d N CO ,n coco co O r N co v ,n CO N- CO 0) 0 N M v ,n CO CO 0)
�.� E � ‘- N co V In CO N- Co O O . N N CO CO M CO M M M M CO M
- O O (9 a)
C a) o d 0 0 0 U C
G W O R N 0 ,n to d' O 7)
�, - D V co 0)
Lti o C n n a°)
,..I N •
E a) co +.: U 0
c O co U
W FIv a s w a j Q a
a Q