Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
217-017
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Friday, October 13, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Austin McLeod P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL ConocoPhillips Alaska, Inc. CD5-17 COLVILLE RIV UNIT CD5-17 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 10/13/2023 CD5-17 50-103-20754-00-00 217-017-0 W SPT 7250 2170170 1812 2118 2117 2117 2117 175 201 202 202 4YRTST P Austin McLeod 8/19/2023 MITIA 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:COLVILLE RIV UNIT CD5-17 Inspection Date: Tubing OA Packer Depth 580 2810 2765 2750IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSAM230820162938 BBL Pumped:4 BBL Returned:4 Friday, October 13, 2023 Page 1 of 1 21 7017 SchlumbogerlAOGCC PTS - PRINT CENTER 6411 A Street 9518 Anchorage,•1 /1 main •Y .I fax ' 'SERVICE ORDER'r WELL NAME API # # '" ATTN: Natural Resources Technician 11 Alaska Oil & Gas Conservation Commision 333 W. 7th Ave, Suite 11 Anchorage, AK 99501196 SERVICE FIELD NAME DESCRIPTION DELIVERABLE DESCRIPTION COLVILLE RIVER TRANSMITTAL DATE TRANSMITTAL# •. -Pb DATA TYPE DATE LOGGED ��'1 6 Color Prints CD's A Transmittal Receipt signature confirms that a package (box, /J envelope, etc.) has been received and the contents of the X (� package have been verified to match the media noted above. " am Signature Date specific content of the CDs and/or hardcopy prints may or may not have been verified for correctness or quality level at this return via courier or sign/scan and email a copy to c lumberger and CPAI. point. i • Wallace, Chris D (DOA) From: NSK Well Integrity Supv CPF3 and WNS <n2549@conocophillips.com> Sent: Tuesday, February 20, 2018 6:31 PM To: Wallace, Chris D (DOA); Loepp,Victoria T (DOA) Cc: Senden, R.Tyler Subject: CRU CD5-17 (PTD 217-017) Conductor Water Flow Report Chris/Victoria, CRU injector CD5-17 (PTD 217-017) has recently been noted by operations to have water flowing to surface through the surface casing by conductor annulus. CPAI suspects this water to be from the same shallow source water that was encountered on CD5-313 (PTD 215-084),as well as other CD5 wells. At present,the water flow rate is—2 gallons per day. We intend to take an initial sample for analysis and collect water at the wellhead to monitor the flow volume. Please let us know if you have any questions or disagree with this plan. Regards, Rachel Kautz/Travis Smith Well Integrity Supervisor,ConocoPhillips Alaska Inc. Office:907-659-7126 Cell:907-943-0450 1 • S O 0 0 0' . co _ Oo N G N N N m v) N to \ m m m ▪ Z C O D O O O O O Lci0 O 0 NCT3 J 00 00 00 0 0 0 O O O O O O J E co 0 wl n 00 00 00 U 0 0 0 0 0 0 0 - > o 5 } coo eo a -J a -J "7,-t.- --I QU1 Q CO -J - DI Z U) co 0 a a 10_ I0_ < d- �I Cl)I Cl)I �I Cl)I it) 0 U Uu) U< U< UJ UU Cl) Ct H a) J a)J Cl)J a) a)J J J J J J J 1 'O Z l l � = . eeel -I21 SI 21 SISI D S F 45 > ccccl ce CY 0 CL D CC 0CL DDDIa) 0cC a)CC a CLUUUUUUUmQ o I ° 2LL TW >.! ii. wii E ii w > > > > > > EC m Z o a�.? 5.? ? lb' m 15 2 d .2 d .2 d .? d •? d •? a .? EL m C) o J (n n In n Ci") o (n L7 N U n U n U N U h U N U n U U • 0 Q O C J a) a) a) cD a) a) a) m a) a) a) a) a) a) a) a) a) a) a) Z a� Q mCL a3 CL mCL m a m� _ � _ � _ � _ _ a o E U m 0 1 ° 1 ° 1 ° 2 0 0 ILL ILL ILL ILL I W ILL 1 W o ow o a) 0 a) U 0 a) 0a) 00 00 00 o a) o a) U d E O 'c °- 'c °- 'c °- 'c o C °- 'c °' 'c °' 'c °- 'c O- 'c °- 'c °- 'c N m O r_W ,_o ° o ° o ° o o ° o ° O ° o ° ,_0 ° o ° o ° o co c:n I— N 0 0 p Q v v U U~ U U U U U U U U~ y J r`W m 1 a) N.1 a) N.I a) 1 mN.1 m 1 m I mN.I a) 1 NN.I a) 1 a) N.I is Ce Q NT w ,- we- W W W W W W W W L.1.1 ,- Wo co a ° c v r` r` r` r` r` r` r` r- r• r` r• r- 0- J 0 Y ; O O O O J m N N N N N N N N N N N N LU = O) O) m O) CT c) a) m o) O) O) (T y co a) N N N N N N N N N N N N IX 0 as Ce co c0 co CO CO co CO co co CO co c0 U LU z Z U 0 < 0 0 ZN- U) co Lo Q O _ O O CO W CD co y 3 o V) c\i in coco N co a CO6./� 0 °I d CL r- C Z C r M C O G O Y 0 m N V - N � u) N N v v O a N E a O 0 T O co 0 r V) Ja zlo Q il) 00 0 P-, CO ✓ c 0'O o Om Z r, _1 2 C o m G N_ 2 c W > O) OU co Ta O C) R' co c.) N M W a O ''/^� J N I- V/ J 0 U Q O cei U o 'a) c Ti Z°I ° Q ° E in O z U o c m cn E J i2 co co Z j C co co CO co co co co co co co co co d y v co co co co co m co co co co co m o c E a3 0 0 00 0 0 0 0 0 0 0 0 0 3 Z co co co co co co m co co co co co co to CC Z 0 'rn a m m m rn m m rn m o) m 0 Z 0 J 0 0 0 0 0 0 0 0 0 0 0 0 0▪ > O J N a ro co co co co co co CO CO CO CO c° CO G > Q U m N N N N N N N N N N N N N co co N- Q z . C N co 7 coMco co co co CO co co co co CO co CO N 12 0 0 p W 0 Z N N N N N N N N N N N N N O a ° E E LLLO z Ts 2 N I'' Z u. W o 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TO T csb OOd W Q O m W W W W W W LU W W W W WC H J 0 H • i G co N Oi O0 N N co N N N N co co o- in o co co a co co co co co b N Z JI y O o O o y O O O O ❑ o II' E _ fa 0 0 0 0 co 0 0 0 0 U N �� 0 a a I= > ca 5 ❑1 ti E w v 4- v E E QU Z o r a 4 E - o 0 0 0 0 o 0 0 0 0 a ch in M 05 N g g O w LU w w 0 LU w w w U 2 wI J J Q' h h I� n h M M M M M °- c -o I I N N N N N M aD OD M O a) C �,' z ❑1 ❑1 ❑I 0 ❑i ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ E -5 5._ 0 ce 1 0� 0� 0� 01- 02 0I- z z z z z z z z z z c. Q U a) U--1 U-� UN1 UNI 0u' Uu)1 N- n 1 N- N- N- n N- n N 2N- z a % (4.:' a .> a ' a .> a .5 a .5 0 0V 0 0 0s o 0 . 0 0 LTc �,`�' 5 00 U.N 0S. 0S. 0S. U.- c.)-.2. U U w UE UE U• U U y UB US U T m m C j >a ai a ai a� ai a� ai a� ci a� ui d aid ai ui co ui o a.) a.) o ai ai co ••••o ai ai a� @ 2 ? > it 8 it�1 it �1 it �1 it�1 it�1 U �1 it,_ ll. N it N it N LL i] 4 Il N lL N ii N it 0 N � 0� o a) g a) g a) g a) g a) o a) gv gU o c.)a_ 0w .i.)-o 0U gg 90 .i.)co 9 1 o c a) c a c o c o c o c a c o c o- •c c c c c o- c c c c c I w o5E 2o 20 20 2o 20 20 oaTi om om om om oa'i om of om o ,t o? gonly _y rI _a) I _a) I a) i _0 I _y nl y 3 m m m m a) 3 m o �nl Ce Q w,- w,- w,- w ,- w,- w,- w,- W U) W U) W U) W U) LU 0 W U) W O W co W co W O W,- O a V N. N- N- N- N- N- N- N- N- n N- N- N- N- N- N- N- a. N- a 0 -J N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0N N N N N N N N N N N N N N N N N W = O) O) O) a) O) O) O) O) O) O) a) O) a) C) O) O) O) N N N N cg�c ,, N N N N N N N N N N N N N Ce p m co m cd.� cog). m 4.co( ,m m m co co m co m co m rn W Z z V 0 C) 0 < Z to co a)._ a v J 0. G. ti 0 • o = O N o o U 0 J N Q b0 V7 r` 0 a ~ r- z 2 m o CO > Na coW J a) ,w J Q O- c ✓ o I rll < c o. z E Q E U m z a3 CO a) CO CO a) CO CO CO N N CO CO CO CO CO ca a) m co ci N N a) ca CO - CO CO CO N CO CO l6 tN N fa 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Coo a) a) 03 a) mal a) a) a) a) a) .9 a) a) N a)a ) a) ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 5 b" ❑ ❑ ❑ o ❑ ❑ o > co to m to co to cfl co co CO to CO CO co CO CO co in ' N N N N N N N N N N N N N N N N N CO O ~ M M M M M M M M CO M M CO M M M CO M U) is CO CO CO 00 CO CO CO CO CO a0 CO CO CO W CO 00 CO CO N N N N N N N N N N N N N N N N N N N T.- to O ,a- 2 a0O NU w U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CC.) E d ❑ ❑ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a M w LU LU w w W w w w w w w w w w LU w w • • 0 0 0 N co O a) as a 0 4)Q Z N Z 2 M M Q O > > > a N N Z_ y 4- 5 Q1 �� WI t >. Z cO a r— Q IR) U D D) EO U N C b o a) a %I-Z 12 �I 5 >. F- a o Z Z m m 6 E m p ! . .0 O 4 4, 1 0E p o p . > U a m F Q it 0�o U�c U�N 2 2 .0 K a�N Qa0 a_ ch do' W 0al 0 V < mco 2 y N u) N a N t J y Z p N f0 it C it y it U O C Ate\ ` y v'-1 v a) c.) a) c��I O a. d Vi'(/1 c.9 ,�jv, m °( E °m °a o� r-w E I'"'" g �_ 0ply _yam y, _ypl oQ COy 7 p p W V a) Ce Q C W U W N W N W N 2 co d t c n r n r a. O.« a .2 CO Cl. J V o 0 0 o Ey E p W _ N N N N co 7 Q _ N N N N y Z ui aS ce a. CD67 rn 0 o) rn rn rn W i Z �' °' E a) V VC79 a)0 m coco O 0) a Z m CC U w co Q +t0 0.. N O O 0) V) O O - I 0. C Oo. 'a U U aQ. � a) r O O W Na) O aE Q w v Vr U aa)) o Jr (1) r 0 E cn < { O 0 o V 0. co E z E. `° coco a ro COo 0 m c a) E 5 0 1— E W .2 to' w O 1 co ♦///�� —I .2 of v/ j p co c N CD J C O 4:1( O C N D. 0 N 0 Q O Q ° Z E " .` O a) U d 0 co p 2 0 E `8 Z cn a) a) a) a) N r m O 0 0 0 0 CO E Q N N cfl TOO TOO m 2 o z 57_., rn �I N i+ N ; o p p 0 p J E G�61:1 } O co � O ►� j )n )n )n w W } co ce o ~ Loo On IOn t) IC)o co c WE a 0 NN N N N N d 0 co oo co oo co w N C Q d O = N E E Z a) ti m in co co O a a) v co Qj id co N z H co C NUU 0 0 0 JN Q o U a n m u E C) Oo. 0 2 O E pdd 0 p 0 0 0 o d (i a re2 LI- 0c 0 a m w w w w $ Z U Cl_ 0 0 0 f 0 • • 0 N o 0 O N O vO vt O z c N v c0 > 7 Z N `'F b o g z L F. z 0 ;-- z w CO COo c F2 0 CO a U IL J W = Ce a 0 C.) W z Z V � a Z 5. Q .. co m3 J O e+ a n C 20 0 01 0 O Zr, 1 O V U o 0 Jr oQcs O. HCIC.) Z 2 , o /� > N W 0) COre CO ) > o Q o °N Q c a z £ I Q o £ U z 1 3▪ 0 4 F > 'm o d n 3 N d d ce 77 co • N m U Q 0 O a. 2 c °) ¢ 1110 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: `I DATE: Friday,July 28,2017 Jim Regg ���f�. c;( 4 11 P.I.Supervisor r SUBJECT:Mechanical Integrity Tests CONOCOPHILLIPS ALASKA,INC. CD5-17 FROM: Adam Earl COLVILLE RIV UNIT CD5-17 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry NON-CONFIDENTIAL Comm Well Name COLVILLE RIV UNIT CD5-17 API Well Number 50-103-20754-00-00 Inspector Name: Adam Earl Permit Number: 217-017-0 Inspection Date: 7/26/2017 Insp Num: mitAGE 170727081758 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well CD5-17 -Type Inj W TVD 7250 Tubing 1310 1310 1310 V 1310 - PTD l 2170170 Type Test SPT Test psi j 1812 IA 80 2020 - 1990 - 1985 - — BBL Pumped: 3.6 ' BBL Returned: 3.6 OA 300 340 , 340 . 340 Interval INITAL !P/F P V 1 Notes: MITIA Friday,July 28,2017 Page 1 of 1 t, x 0 i � 11-02 r-1 cera 0 t..,.. r _ o N W N ) _7m p ,- — tip u CD Q -Y V ra Y u I N r. N 0 o v, +-' P N N p1 OC N O pp w H > O co O co V a u N E }% O co > a c 0 O 'p O co . co >- a a 0 l7 r s Ou a = m o 3 c^ _c c C co E }' (o W L 'D _O a 6 il I-< N ,•.,=,•.,= C 41 ? > > H Z:; Q C (6 a 4' O N E O >' I',' O N C c C 0 c13D i Q W J C +' �- W Op C (B O LL ' , a E • co 1- Q a co c < ? V (o (Do O Q (f) y„ a1 _c(13 (� i1 Li E a) E v v o 0 O r; Z v, a N -' _O C O c p H ►, O > > c a f' F ro 0 U Q v _c ° > ro k" W F. �+ 'E Lo cv U o m =CO v w U E > U A V: a1 W ; STATE OF ALASKA AL KA OIL AND GAS CONSERVATION COM1vIISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a.Well Status: Oil Gas SPLUG Other Abandoned Suspended 1 b.Well Class: 20AAC 25.105 20AAC 25.110 Development Exploratory GINJ WINJ WAG X' WDSPL No.of Completions: Service X+ Stratigraphic Test 2.Operator Name: 6.Date Comp.,Susp.,or(►Igtti.. 14. Permit to Drill Number/ Sundry: ConocoPhillips Alaska,Inc. Aband.: 6/10/201 L` 217-017 ' 3.Address: 7. Date Spudded: 15.API Number: P.O.Box 100360 Anchorage,AK 99510-0360 4/25/2017 50-103-20754-00-00 ' 4a.Location of Well(Governmental Section): 8. Date TD Reached: 16.Well Name and Number: Surface: 385'FNL,2747'FEL,Sec 18,T11 N,R4E, UM 5/20/2017CRU CD5-17 ' Top of Productive Interval: 9. Ref Elevations: KB:70.28 ' 17. F.-�� r z--- ;_��� 2016'FNL,3080'FEL,Sec 21,T11 N,R4E,UM GL:34 BF: - 0i1341 �:1!T�f!i:' - _ °;re 'l Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: , 2765'FNL,2390'FEL,Sec 34,T11 N,R4E,UM N/A ASRC-NPR4,ADL 387208,ASRC-NPR2,ADL 387209 4b. Location of Well(State Base Plane Coordinates,NAD 27): 11.Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- 349231 y- 5965829 Zone- 4 28645/7640 ' 932669,932193,932128,932195 TPI: x- 359343 y- 5958722 Zone- 4 12.SSSV Depth MD/TVD: 20.Thickness of Permafrost MD/TVD: Total Depth: x- 365129 y- 5947306 Zone- 4 N/A 1320/1316 5. Directional or Inclination Survey: Yes (attached) No 13.Water Depth,if Offshore: 21.Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL)I N/A 22. Logs Obtained: List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential, gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary RECEIVED GR/Res/Sonic-CMT top correlation LAS " J U L 1 3`2201177 AO ' CC 23. CASING, LINER AND CEMENTING RECORD WT.PER SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING GRADE HOLE SIZE CEMENTING RECORD FT. TOP BOTTOM TOP BOTTOM PULLED 20 78.6 H-40 37 114 37 114 42 10 yds 10 3/4 45.5 L-80 37 2222 37 2181 13 1/2 1001 sx 11.0 ppg, Class G Surface Cement 290 sx 15.8 ppg,Class G Tail Cement 7 5/8 29.7 L-80 34 15831 34 7604 9.875 x 10 1/2 Stage 1:888 sx 15.8ppg, Class G cement C4anc 9.T37 ev 1A A nnn rbee 4 1/2 12.6 L-80 14931 21169 7670 7670 6 3/4 Liner 24.Open to production or injection?Yes X No 25.TUBING RECORD If Yes, list each interval open(MD/TVD of Top and Bottom; Perforation SIZE DEPTH SET(MD) PACKER SET(MD/TVD) Size and Number; Date Perfd): 4 1/2 14974 13742 Perforations @ 16094-21165 MD and 7619-7670 TVD COMPLETION 26.ACID, FRACTURE,CEMENT SQUEEZE,ETC. 21169-21169 MD and 7670-7670 TVD 1)AT Was hydraulic fracturing used during completion? Yes No . /-'___ Per 20 AAC 25.283(i)(2)attach electronic and printed information VERIFIED DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,gas lift,etc.): WAITING FOR HOOK-UP Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press. 24-Hour Rate - - Form 10-407 Revised 5/f kb 11/+421` VTI- HP'CONTINUEED ON PAGE 2 Submit ORIGINIAL only 7// r1/4sal RBDMS v-JUL 1 3 2017 G • 28.CORE DATA Conventional Core(s): Yes No X Sidewall Cores: Yes No X If Yes,list formations and intervals cored(MD/TVD,From/To),and summarize lithology and presence of oil,gas or water(submit separate pages with this form, if needed).Submit detailed descriptions,core chips,photographs,and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes No X Permafrost-Top Surface Surface If yes, list intervals and formations tested,briefly summarizing test results. Permafrost-Base 1320 1316 Attach separate pages to this form,if needed,and submit detailed test Top of Productive Interval 15831 7604 information, including reports,per 20 AAC 25.071. Formation @ TPI-Alpine A C-30 2370 2315 K-3 5163 3785 K-2 5767 4027 Albian 97 7482 4723 Albian 96 10145 5803 Kalubik 13558 7185 Kuparuk C 13887 7296 LCU 13897 7325 Alpine 14636 7474 Alpine C 14708 7483 Alpine A 15802 7601 TD 28645 7640 Formation at total depth: Alpine A • 31. List of Attachments: Daily Operations Summary, Definitive Survey,Cement Report,Schematics Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis, paleontoloaical report.production or well test results.per 20 AAC 25.070. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: G. L.Alvord Contact Name: Kurt Alexa Authorized Title: Alaska Drilling Manager Contact Email: Kurt.J.AlexaAcop.com Authorizede n Contact Phone: 2634933 C. Signature: /rj, . U A- Date: 7(( f'7 INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item la: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b: Well Class-Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Item 4b: TPI(Top of Producing Interval). Item 9: The Kelly Bushing,Ground Level,and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 19: Report the Division of Oil&Gas/Division of Mining Land and Water:Plan of Operations(LO/Region YY-123), Land Use Permit(LAS 12345), and/or Easement(ADL 123456)number. Item 20: Report measured depth and true vertical thickness of permafrost.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Pursuant to 20 AAC 25.071,submit detailed descriptions,core chips,photographs,and all subsequent laboratory analytical results,including,but not limited to:porosity, permeability,fluid saturation,fluid composition,fluid fluorescence,vitrinite reflectance,geochemical,or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including, but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only • CD5 - 17 Alpine A & C Multi-Lat Injector. Schematic updated with actual depths 6/21/17 20"94#H-40 Welded Upper Completion: Conductor to 114' 1)4-'/2" 12.6#/ft TXP 2) Shallow nipple profile 3)4-'/z"x 1"Camco KBMG GLM (xx°)w/DCK2 pinned for 2500 psi casing to tbg shear 4) Baker Premier Packer x Landing Nipple, 3.813"X 5)CMU sliding sleeve 2,119' MD 6) DB nipple 3.75" ID Lower Completion: <' 7) Two 4.5" 12.6#L80 TXP Liners with Perf Pups 8) ZXP liner top packer&Flexlock Liner Hanger 10-3/4"60#L-80 H563 XO 5" Hydril 521 Box X 4-1/z"TXP pin Surface Casing Tandem Wedge with DB profile for future CTD optionality 2,223' MD 4.5" 12.6#TXP Liner with Perf Pups cemented to surface 4-1/2" 12.6#L-80 HYD563 14974 7 5/8"29#L-80 Hyd 563/BTCM Intermediate Csg 15,821' MD C sand Lateral Gas Lift Mandrel 4-1/2" 12.6#L-80 TXP Liners 6 3/4" Hole TD 13,677' MD with Perf Pups 14,844'—22,957' MD Alpine C sand Liner from 411> 0 0D 14,906'-15,600' MD& 0 0 0 0 0 19,493'-22,675' MD i, Baker Premier Production Packer , 13,742'MD ** ' 0 0 0 0 Alpine A sand Liner from 14,931-21,166' MD CMU Sliding Sleeve A sand Lateral 6 3/4" Hole TD Zxp liner top packer Landing Nipple, 3.813"X 14,931' MD 28,645' MD 13,873' MD Tandem Wedge, 3.687"DB Profile 15,044' MD WNS 46OD CD5-17 nocoPhiflips .,- Well Attrib Max AngD TD AlR'4A-I 4,s ', Wellbore API/UWI Field Name Wellbore Status ncl(°) MD( ) Act Btm(ftKB) carwmohigips ' 501032075400 ALPINE PROD 93.64 28,537.73 28,645.0 ... Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date MULTIPLE LATERALS-CD5-17,7/11/20172:48:51 PM SSSV. NIPPLE Last WO: 3628 6/11/2017 Vertical achemabc(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date Last Tag' Rev Reason: NEW WELL pproven 6/23/2017 HANGER;31.2- 'It Casing Strings Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len g...Grade Top Thread CONDUCTOR 20 19.124 36.6 114.0 114.0 78.60 H-40 'L Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread B 'Or" SURFACE 10 3/4 9.950 36.6 2,222.5 2,181.3 45.50 L-80 Hyd 563 Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread INTERMEDIATE 75/8 6.875 34.1 15,830.6 7,604.3 29.70 L80 TXP Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread ME LINER A Sand 41/2 3.958 14,931.2 21,169.5 7,670.0 12.60 L-80 TXP CONDUCTOR;36.6-114.0Liner Details Nominal ID Top(ftKB) Top(TVD)(ftKB) Top Incl(°) Item Des Com (in) NIPPLE,2,119.6 ' I 14,950.9 7,513.0 83.15 NIPPLE 5-1/2"RS Nipple 5-1/2"Hyd 563 Box x Box 4.870 l14,953.7 7,513.3 83.15 HANGER 5-1/2 17#x 7-5/8"29.7-39#DG FL pinned 2500 psi 4.840 • • SURFACE;36.8-2,222.5 L 14,962.0 7,514.3 83.17 SBE Seal Bore 190-47 x 19.20'w/5-1/2"Hyd 563 box x 4.750 pin 14,981.7 7,516.6 83.28 XO Cross-over 5-1/2"L-80 Hyd 563 box x 4-1/2"12.6# 3.958 REDUCING TXP pin 15,032.4 7,522.4 83.64 WHIPSTOCK Tandem Wedge,4 1/2"TXP 3.958 ' 15,044.9 7,523.8 83.73 TRIPLE Triple connect bushing 3.958 CONNECTION BUSHING 15,047.5 I 7,524.1 83.74 NIPPLE DB Nipple w/3.687"Profile 3.687 GAS LIFT,13,677.2 111 Tubing Strings Tubing Description String Ma... ID(in) Top(ftKB) Set Depth(ft..Set Depth(TVD)I. Wt(lb/ft) Grade Top Connection inli TUBING 41/2 3.958 31.2 14,974.5 7,515.8 12.60 L-80 Hyd563 Completion Details PACKER,13,742.5 -- '� Nominal ID • II Top(ftKB) Top(TVD)(ftKB) Top Incl(°1 Item Des Corn (in) 31.2 31.2 0.00 HANGER FMC 4-1/2"Tubing Hanger Hydril 563 3.958 in 2,119.6 2,086.4 21.50 NIPPLE NIPPLE,LANDING,41/2",X,3.813",Hydril 563 3.813 SLIDING SLV,13,613.5 13,740.7 7,249.2 70.60 XO JOINT XO 4 1/2",12.6#,L80,Hydril 563 x TC2 3.958 IR 13,742.5 7,249.8 70.62 PACKER Baker premier production packer 4.5"TC2 x 7 5/8"298 3.850 NIPPLE;13,873.3 - 13,803.8 7,269.8 71.36 XO JOINT XO 4 1/2",12.6#,L80,Hydril 563 x TXP 3.938 13,813.5 7,272.9 71.48 SLIDING SLV SLEEVE,SLIDING,CMU,4 1/2",SCHLUMBERGER 3.812 3.813"DB-6,TXP'Not Useable No-Go OD 3.843"" 13,818.7 7,274.5 71.54 XO JOINT XO 4 1/2",12.6#,L80,TXP x Hydril 563 3.938 it 13,873.3• 7,291.5 72.34 NIPPLE NIPPLE,LANDING,4 1/2",X,3.813",HYD563 with RHC 3.813 Plug Body Installed LOCATOR;14,938.1 Al 14,936.1 7,511.2 83.12 LOCATOR Locator,5.38"OD,GBH-22 3.860 it 14,937.6 7,511.4 83.12 SEAL ASSY Seal Assy,Baker,192-47 3.870 SEAL ASSY;14,9376 :I Perforations&Slots Shot Dens Top(TVD) Btm(TVD) (shots/ Top(ftKB) Btm(ftKB) (ftKB) (ftKB) Zone Date ft) Type Corn 16,094.0 21,165.0 7,619.2 7,669.8 ALPA,CD5- 8.0 IPERF 17 21,169.0 21,169.0 7,669.9 7,669.9 ALPA,CD5- 1.0 (PERF 17 Mandrel Inserts St ati [I on Top(TVD) Valve Latch Port Size TRO Run Top(ftKB) (ftKB) Make Model OD(in) Sew Type Type (in) (psi) Run Date Com 1 -K 13,677.2 7,227.7 CAMCO BMG 1 SOV •BEK 6/9/2017 Shea red Open I.\TCRMrIJI ArF 341-1,.8306 j.' Notes:General&Safety End Date �) Annotation NOTE 11?I:i' al.-- il1)1'. 1)1)1/ 01)1: M AA 1)1)1:' IPERF;18,084.0-21,180.0 tit. flit :1:1: /1)1: E16'. (PERF;21,189.0 LINER A Sand;14,931.2- 21,189.5 WNS PROD CD5-17L1 ConocCJF til(p ,t,!'''''':6;' s Well Attrib Max Ang D TD Alaska Inc, Wellbore APUUWI Field Name Wellbore Status ncl(°) MD Act Btm(ftKB) CceroccPhillips 501032075460 ALPINE PROD 92.89 15,184.77 22,957.0 --- Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date MULTIPLE LATERALS-CD5-17L1,7/11/20172:50:00 PM SSSV: NIPPLE Last WO: 3628 6/11/2017 Vertical schemabc.:(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date - -- - Last Tag' Rev Reason' NEW WELL jennalt 6/23/2017 HANGER;31.2 I Casing Strings L.. ..,.... Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)...Wt/Len p...Grade Top Thread OPEN HOLE Section 1 6 3/4 14,858.0 14,905.7 7,505.7 C-Sand Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len It...Grade Top Thread OPEN HOLE Section 2 6 3/4 (5,600.0 19,492.6 7,511.7 C-Sand Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)... Wt/Len It...Grade Top Thread LINER L2 C-Sand 4 1/2 3.958 14,905.7 15,600.0 7,494.5 12.60 L-80 TXP 111 Liner Details Nominal ID CONDUCTOR;38.8-1140 Top(ftKB) Top(TVD)(ftKB) Top Incl(°) Item Des Com (in) 14,921.5 7,506.6 87.79 XO X0,5-1/2,H563 Box X 4-1/2",TXP Pin 3.958 REDUCING (Casing) NIPPLE;2,1196 Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)... WtlLen(I...Grade Top Thread II LINER L1 C-Sand 41/2 3.958 19,492.6 22,675.0 7,560.7 12.60 L-80 TXP-M II I Liner Details I Nominal ID SURFACE;36.6-2,222.5-. 1 Top(kKB) Top(ND)(ftKB) Top Incl(°) Item Des Com (in) 19,492.6 7,511.7 88.57 SETTING SLV HRDE Liner Setting Sleeve 4.910 19,506.6 7,512.0 88.54 XO X0,5-1/2",H563 Box X 4-1/2",TXP Pin 3.920 a REDUCING Perforations&Slots • Shot 1 Dens S ! Top(TVD) Bhn(ND) (shots/ Top(ftKB) Btm(ftKB) (161(8) (ftKB) Zone Date ft) Type Com 14,844.0 14,906.0 7,500.0 7,505.7 ALPC,CD5- (PERF 17L1 GAS LIFT;13,6772 15,331.0 15,591.0 7,494.5 7,494.6 ALPC,CD5- 8.0 IPERF 17L1 15,600.0 15,600.0 7,494.5 7,494.5 ALPC,CD5- 1.0 IPERF 17L1 PACKER 13,7a2s 15,600.0 19,493.0 7,494.5 7,511.7 ALPC,CD5- IPERF 17L1 19,913.0 22,671.0 7,539.8 7,560.8 ALPC,CD5- 8.0 IPERF 17L1 ( .€ 22,675.0 22,675.0 7,560.7 7,560.7 ALPC,CD5- 1.0 IPERF SLIDING SLV;13,813.5 I , 17L1 Notes:General&Safety End DateAnnotation IS NOTE' NIPPLE;13,873.3 - in INTERMEDIATE;34.1-15,830.6 IPERF;14,844.0-14,906.0 OPEN HOLE Section 1 C- A Sand,14,858.0-14,905.7 a IS __ IPERF;15,331.0-15,591.0 000;(. 800; IPERF;15,600.0 1100' LINER L2 C-Sand;14,905 7- .._W.. 15.so0.0 ...... IPERF;15,600 0-19,493.0N °`"' OPEN HOLE Section 2 C- •4...a a Sand;15,600.0-19,492.6 o 10 a03 IT IM II IPERF;19,913.0-22,671.0 :1:f: AI 1i%'. LINER L1 C-Send,19,492.6- £;a:I: 22,675.0 -- IPERF;22,675.0 :.i., Operations Summary (with Timelog epths) 0 CD5-17 ConocoPt ititps Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 4/23/2017 4/23/2017 12.00 MIRU MOVE MOB P Mobilized the ball mill,pipe shed,and 0.0 0.0 08:00 20:00 DSM to CD5. Spotted the ball mill and DSM near CD5-17. Prepped the area around CD5-17,installed diverter,and started heating. Before moving the sub modal off CD4 Ice pad damage was observed on the drillers side tire. 4/23/2017 4/24/2017 4.00 MIRU MOVE MOB T Removed wind walls to access tire w/ 0.0 0.0 20:00 00:00 pronounced bubble under the sub. Moved spare tire to the shop in order to thaw and remove snow. SimOps, continued to transport supplies f/CD4 to CD5 and spot equipment near CD5- 17 4/24/2017 4/24/2017 9.00 MIRU MOVE MOB T Replaced tire on the Sub and installed 0.0 0.0 00:00 09:00 windwalls. 4/24/2017 4/24/2017 14.00 MIRU MOVE MOB P Mobilized sub to CD5. 0.0 0.0 09:00 23:00 4/24/2017 4/25/2017 1.00 MIRU MOVE MOB P Installed beaver slide on Sub. 0.0 0.0 23:00 00:00 4/25/2017 4/25/2017 2.00 MIRU MOVE MOB P PJSM,Install beaver slide. 0.0 0.0 00:00 02:00 SIMOPS-Move pits/Motors away to make room for sub. 4/25/2017 4/25/2017 2.50 MIRU MOVE MOB P PJSM,Remove rig floor lock ears. 0.0 0.0 02:00 04:30 Move and spot sub over CD5-17. Center and shim in place. 4/25/2017 4/25/2017 1.00 MIRU MOVE RURD P Lower rig floor support stompers. 0.0 0.0 04:30 05:30 Position MPDE on stomper feet in cellar.Lower rear wind walls. SIMOPS-Move pipe shed. 4/25/2017 4/25/2017 0.75 MIRU MOVE MOB P Skid rig floor into drilling position. 0.0 0.0 05:30 06:15 SIMOPS-Continue moving pipe shed. 4/25/2017 4/25/2017 0.50 MIRU MOVE MOB P PJSM,Spot Pits/Motors into position, 0.0 0.0 06:15 06:45 make up to sub. 4/25/2017 4/25/2017 1.25 MIRU MOVE MOB P PJSM,Spot pipe shed and ball mill. 0.0 0.0 06:45 08:00 Steam on sub @ 07:00 hrs. SIMOPS-Connect power from motors to sub and connect service lines.Sub on generator power @ 08:00 hrs. 4/25/2017 4/25/2017 1.00 MIRU MOVE RURD P Connect service lines @ sub/pits 0.0 0.0 08:00 09:00 innerconnect,water to sub @ 08:45 hrs. Sperry Gyro obtain rig floor orientation. 4/25/2017 4/25/2017 2.00 MIRU MOVE RURD P Work on rig acceptance checklist. 0.0 0.0 09:00 11:00 Function drag chain and knive valve in pits,function top drive,drawworks and rotary table.Load pits with 9.6 ppg Drilplex surface mud,prime pumps. Rig accepted @ 11:00 hrs. 4/25/2017 4/25/2017 1.00 MIRU MOVE RURD P Rig up 4"x 2"1502 equipment on 0.0 0.0 11:00 12:00 conductor,M/U studs on 20"annular. Connect accumulator lines to annular. R/U split surface riser on 20"annular. Page 1/34 Report Printed: 6/12/2017 IA 41 Operations Summary (with TimeloRepths) 0 CD5-17 'Phillips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKE) End Depth(ftKE). 4/25/2017 4/25/2017 4.00 MIRU MOVE RURD P Contnue torque surface annular,R/U 0.0 0.0 12:00 16:00 split riser,flowline,turnbuckles, holefill,bleeder,Quadco work on PVT for pill pit and shaker air pressure alarms.Install drain hoses,P/U safety valves to rig floor,install manifold on conductor.Rig on Hiline @ 13:10 hrs. Obtain RKB's,RKB-GL=36.28',RKB- Landing ring=36.62'. 4/25/2017 4/25/2017 2.00 MIRU MOVE RURD P P/U BHA equipment to rig floor,UD 4" 0.0 0.0 16:00 18:00 equipment. 4/25/2017 4/25/2017 0.50 MIRU MOVE RURD P Install 90'mousehole. 0.0 0.0 18:00 18:30 4/25/2017 4/25/2017 0.50 MIRU MOVE SVRG P Service top drive,PJSM on M/U BHA. 0.0 0.0 18:30 19:00 4/25/2017 4/25/2017 2.25 MIRU MOVE BHAH P M/U BHA#1 as per DD/MWD to 94' 0.0 94.0 19:00 21:15 MD.Orient UBHO to motor.MWD- Motor TFO=322.95°. 4/25/2017 4/25/2017 0.25 MIRU MOVE SFTY P Pre-Spud meeting with DDI,SLB,MI, 94.0 94.0 21:15 21:30 CPAI.Discuss objectives and hazards,rig evacuation and muster points. 4/25/2017 4/25/2017 1.00 MIRU MOVE SEQP P Function test annular,test with water 94.0 94.0 21:30 22:30 on top-good.Fill surface riser and check for leaks-good.Test mud lines to 3500 psi-good. SIMOPS-Test rig gas alarms. 4/25/2017 4/25/2017 1.00 MIRU MOVE BHAH P M/U BHA to 185',RIH and tag @ 114' 94.0 114.0 22:30 23:30 MD. 4/25/2017 4/26/2017 0.50 SURFAC DRILL DDRL P Drill from 114'MD to 160'MD, 160' 114.0 160.0 23:30 00:00 TVD.ADT=.5 hrs,P/U=77k,S/O=77k, ROT=77k,Tq on/off=1k/1k,445 gpm @ 500 psi. 4/26/2017 4/26/2017 12.00 SURFAC DRILL DDRL P Directional drill from 160'MD to 1,081' 160.0 1,081.0 00:00 12:00 MD, 1,080'TVD.ADT 6.51, ART=3.99,AST=2.52.P/U=105k, S/0=100k,ROT=102k,WOB=20-30k, Tq on/off=6k/2k.525 gpm/1300 psi rotating 40-60 rpm,440 gpm/1050 psi sliding.Maintaining mud weight 9.6- 9.8 ppg.Gyro surveys from 400'to 724'. 4/26/2017 4/27/2017 12.00 SURFAC DRILL DDRL P Directional drill from 1,081'MD to 1,081.0 2,145.0 12:00 00:00 2,145'MD,2,110'TVD.ADT 8.42, ART=6.38,AST=2.08.P/U=126k, S/0=114k,ROT=118k,WOB=20-30k, Tq on/off=5.5/2.5k @ 80 rpm.750 gpm @ 2200 psi.Maintaining mud weight 9.6-9.8 ppg,start weight up to 10.0 ppg. 4/27/2017 4/27/2017 1.25 SURFAC DRILL DDRL P Directional drill from 2,145'MD to 2,145.0 2,232.0 00:00 01:15 2,232'MD,2,190'TVD.ADT 1.25, ART=.23,AST=1.02.P/U=130k, S/0=125k,ROT=120k,WOB=20-30k, Tq on/off=5/2k @ 80 rpm.775 gpm @ 2300 psi.Weight up to 10.0 ppg on the fly. 4/27/2017 4/27/2017 1.00 SURFAC CASING CIRC P Circulate 2 bottoms up,pump around 2,232.0 2,047.0 01:15 02:15 34 bbl Nut Plug sweep @ 775 gpm, 2220 psi,80 rpm,2k Tq.Rack back stand after each BU. Page 2/34 Report Printed: 6/12/2017 '' •perations Summary (with TimeloRepths) c CD5-17 ititps 4g:�ka Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Our(Er) Phase Op Code Activity Code Time P-T-X Operation (EKE) End Depth(EKE) 4/27/2017 4/27/2017 0.75 SURFAC CASING OWFF P Monitor well for flow,static for 30 2,047.0 2,047.0 02:15 03:00 minutes.Blow down top drive. 4/27/2017 4/27/2017 1.00 SURFAC CASING TRIP P POOH on elevators from 2,047'MD to 2,047.0 1,674.0 03:00 04:00 1,674'MD observe improper displacement,Calculated 3.2 bbl, Actual 1 bbl.Pull 35k over @ 1,913', 1,881', 1,806'MD,able to work through OK. 4/27/2017 4/27/2017 0.25 SURFAC CASING CIRC P Circulate bottoms up @ 750 gpm, 1,674.0 1,580.0 04:00 04:15 1990 psi,80 rpm,2k Tq.Observe shakers unloading clay. 4/27/2017 4/27/2017 0.50 SURFAC CASING PMPO P Pump out of hole from 1,580'MD to 1,580.0 1,297.0 04:15 04:45 1,297'MD @ 500 gpm,970 psi. 4/27/2017 4/27/2017 2.50 SURFAC CASING PMPO P Continue pumping out of hole from 1,297.0 185.0 04:45 07:15 1,297'MD to 185'MD @ 300 gpm 420 psi(reduced rate in permafrost).Hole unloaded clay @ 563'MD. 4/27/2017 4/27/2017 0.25 SURFAC CASING TRIP P POOH on trip tank from 185'MD to 94' 185.0 94.0 07:15 07:30 MD. 4/27/2017 4/27/2017 1.00 SURFAC CASING BHAH P PJSM,L/D BHA#1 from 94'per 94.0 0.0 07:30 08:30 DD/MWD.Calc fill=31.91 bbl,Actual fill=53 bbl. 4/27/2017 4/27/2017 0.75 SURFAC CASING BHAH P Clean and clear rig floor of BHA 0.0 0.0 08:30 09:15 components. SIMOPS-Prepare pumps for casing run,install air boot on pollution pan. 4/27/2017 4/27/2017 1.50 SURFAC CASING RURD P R/U to run 10-3/4"casing, R/U Volant 0.0 0.0 09:15 10:45 CRT,bail extensions,elevators,350T spiders.Monitor well on TT, 1 bbl lost. 4/27/2017 4/27/2017 1.25 SURFAC CASING PUTB P PJSM,P/U and RIH with 10-3/4" 0.0 182.0 10:45 12:00 casing per detail to 182'MD.P/U shoe,2 jts and float collar,Establish circulation and check floats-Good. 4/27/2017 4/27/2017 8.25 SURFAC CASING PUTB P Continue P/U and RIH with 10-3/4" 182.0 1,487.0 12:00 20:15 45.5#L-80 Hydril 563 casing from 182' MD to 1,497'MD.Tight @ 388'MD, wash down @ 3 bpm 30-150 psi from 388'to 837'MD.Ran 11 total bow springs,switch to Centek centrilizers due large OD and rigidity of bow springs. 4/27/2017 4/27/2017 1.00 SURFAC CASING CIRC P Circulate bottoms up below 1,487.0 1,487.0 20:15 21:15 permafrost,stage pumps up to 6 bpm, 160 psi.P/U=125k,5/0=112k. Pumped 120 bbl total. 4/27/2017 4/27/2017 1.50 SURFAC CASING PUTB P Continue P/U and RIH with 10-3/4" 1,487.0 2,183.0 21:15 22:45 45.5#L-80 Hydril 563 casing from 1,487'MD to 2,183'MD. 4/27/2017 4/27/2017 0.25 SURFAC CASING CIRC P Establish circulation,stage up to 2.5 2,183.0 2,183.0 22:45 23:00 bpm, 180 psi,P/U=135k,5/0=110k. 4/27/2017 4/27/2017 0.50 SURFAC CASING PUTB P Make up hanger and split landing joint. 2,183.0 2,183.0 23:00 23:30 4/27/2017 4/27/2017 0.25 SURFAC CASING HOSO P Land hanger,casing on depth @ 2,183.0 2,222.0 23:30 23:45 2,222'MD 4/27/2017 4/28/2017 0.25 SURFAC CEMENT CIRC P Establish circulation stage pumps up 2,222.0 2,222.0 23:45 00:00 to 2 bpm, 170 psi.P/U=135k, S/0=110k. Page 3/34 Report Printed: 6/12/2017 • 6 ; Operations Summary (with Timelog Depths) CD5-17 ConocoPhitliips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr); Phase Op Code Activity Code Time P-T-X Operation (ftKS) End Depth(ftKS) 4/28/2017 4/28/2017 1.25 SURFAC CEMENT CIRC P Circulate and condition for cement job, 2,222.0 2,222.0 00:00 01:15 stage up to 8 bpm,200 psi. SIMOPS-UD bail extensions and casing elevators. 4/28/2017 4/28/2017 1.00 SURFAC CEMENT CIRC P Pump around 31.5 bbl weighted Nut 2,222.0 2,222.0 01:15 02:15 Plug sweep with dye to gauge hole size @ 8 bpm,200 psi.Calculated return @ 3749 stks,Actual return @ 3430 stks. 4/28/2017 4/28/2017 0.25 SURFAC CEMENT RURD P Rig up 1502 cement hose to swivel. 2,222.0 2,222.0 02:15 02:30 Close auto and manual IBOP. 4/28/2017 4/28/2017 1.00 SURFAC CEMENT CIRC P Continue circulate and condition @ 8 2,222.0 2,222.0 02:30 03:30 bpm,400 psi through cement lines. SIMOPS-PJSM on cement job. 4/28/2017 4/28/2017 2.75 SURFAC CEMENT CMNT P SLB pressure test lines to 3100 psi, 2,222.0 2,222.0 03:30 06:15 good.Pump 75.1 bbl 10.5 ppg MudPush II,drop bottom plug.Pump 302 bbl 11 ppg lead cement @ 5.5 bpm 280 psi WHP.Observe MudPush on shaker @ 285 away.Swap to tail cement,pump 60.2 bbl 15.8 ppg tail @ 4 bpm,340 psi wWHP.Drop top plug and kick out with 10 bbl water. Rig displace @ 8 bpm,850 psi for 1850 stks,slow to 3 bpm 540 psi to bump,bump plug @ 1935 stks. Pressure up to 1050 psi and hold 5 min.Bleed off pressure and check floats good.CIP @ 06:06 hrs. 110 bbl good 11.0 ppg cement to surface after a clabbered/thick fluids cleared 4/28/2017 4/28/2017 1.25 SURFAC CEMENT RURD P Flush riser and 20"annular,function 2,222.0 0.0 06:15 07:30 annular 3X flushing with black water @ 9.5 bpm,close annular on 4th function. Blow down and rig down cement equipment,rig down Volant CRT,lay down split landing joint. 4/28/2017 4/28/2017 2.50 SURFAC CEMENT WOC P Perform derrick inspection,clean and 0.0 0.0 07:30 10:00 inspect top drive,clean pits.Load pipe shed with 5"DP. 4/28/2017 4/28/2017 2.00 SURFAC CEMENT WOC P Mechanic work on pipe skate,perform 0.0 0.0 10:00 12:00 MP2 work orders,clean 5"drill pipe box and pin,prepare for NCS30 high friction facter pipe dope application for top 3,000'of intermediate section. 4/28/2017 4/28/2017 4.00 SURFAC CEMENT WOC P Continue cleaning box and pin on 102 0.0 0.0 12:00 16:00 jts 5"DP for NCS30 pipe dope application.Cleaning pits,complete work on pipe skate. 4/28/2017 4/28/2017 1.00 SURFAC CEMENT WOC P Break down NM flex collars in derrick, 0.0 0.0 16:00 17:00 M/U NM stabilizer and 10V2'under reaner,stand back in derrick. 4/28/2017 4/28/2017 1.50 SURFAC CEMENT WOC P Continue cleaning pipe connections 0.0 0.0 17:00 18:30 on 5"DP,cleaning pits. 4/28/2017 4/28/2017 1.00 SURFAC CEMENT OWFF P Verify annular pressure 0 psi,open 0.0 0.0 18:30 19:30 and monitor for flow,static.Open annular,make up split landing joint and lay down.Lay down mousehole. Page 4/34 Report Printed: 6/12/2017 operations Summary (with Timelog Depths) CD5-17 ConcxoPhilliprs Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKS) 4/28/2017 4/28/2017 1.50 SURFAC CEMENT NUND P PJSM,Flush riser and N/D flowline, 0.0 0.0 19:30 21:00 mud bucket,hole fill lines,L/D upper and lower risers. 4/28/2017 4/28/2017 1.00 SURFAC CEMENT NUND P N/D surface annular and starting 0.0 0.0 21:00 22:00 head. 4/28/2017 4/28/2017 1.50 SURFAC WHDBOP NUND P Prep and N/U wellhead.Test wellhead 0.0 0.0 22:00 23:30 to hanger neck seals to 1000 psi for 10 minutes,good. 4/28/2017 4/29/2017 0.50 SURFAC WHDBOP NUND P N/U new FMC speedhead adapter to 0.0 0.0 23:30 00:00 wellhead.Prep stack for N/U. 4/29/2017 4/29/2017 1.75 SURFAC WHDBOP NUND P Continue changing out FMC speed 0.0 0.0 00:00 01:45 head adapter.N/U BOPE,torque studs. SIMOPS-L/D surface riser.Prep BOP test equipment.Continue cleaning 5" drill pipe conenctions for DSC30 pipe dope. 4/29/2017 4/29/2017 2.75 SURFAC WHDBOP MPDA P R/U MPDE clamp,Orbit valve,flow 0.0 0.0 01:45 04:30 box,Katch Kan, 1502 equipment,4" drain/return lines. SIMOPS-Continue cleaning 5"DP, prep test equipment,cleanand clear rig floor,take on LSND to rig pits. 4/29/2017 4/29/2017 2.00 SURFAC WHDBOP MPDA P R/U and test MPDE,set lower test 0.0 0.0 04:30 06:30 plug and MPD test cap,replace seal on test cap.Fill and test to 250/1200 psi.Pull MPD test cap and install trip nipple. 4/29/2017 4/29/2017 0.75 SURFAC WHDBOP RURD P R/U to test BOPE,set 5"test joint,fill 0.0 0.0 06:30 07:15 lines with water and purge air. 4/29/2017 4/29/2017 3.25 SURFAC WHDBOP BOPE P Test BOPE with 5"TJ,Annular 0.0 0.0 07:15 10:30 250/2500 psi,all other 250/3500 psi. AOGCC Matt Hererra waived witness. Tested annular,Upper and lower 3%" x 6"VBR's,Choke valves#1-14, Needle valve above#1,4"Demco kill valve,HCR choke and kill,5"FOSV and Dart valve,Auto and maunual IBOP,Manual choke and kill all 5 min each on chart. 4/29/2017 4/29/2017 0.25 SURFAC WHDBOP BOPE P Perform accumulator function test, 0.0 0.0 10:30 10:45 System pressure=2950 psi,Pressure after functioning all rams annular and HCR's=1500 psi,200 psi attained=33 sec,Full system recovery=157 sec.4 bottle N2 average=1950 psi. 4/29/2017 4/29/2017 1.00 SURFAC WHDBOP BOPE P Pull test joint.Test blind rams to 0.0 0.0 10:45 11:45 250/3500 psi 5 min each charted,Test manual and super auto choke to 1100 psi.Flush poor boy de-gasser with water @ 3 bpm.Tested gas alarms, flowline sensor and PVT. 4/29/2017 4/29/2017 0.25 SURFAC WHDBOP RURD P Blow down lines and rig down test 0.0 0.0 11:45 12:00 equipment. SIMOPS during testing-Continue cleaning 5"DP and protectors in pipe shed. 4/29/2017 4/29/2017 0.50 SURFAC WHDBOP RURD P FMC set 10"ID wear ring.Blow down 0.0 0.0 12:00 12:30 choke manifold and lines. Page 5/34 Report Printed: 6/12/2017 '= operations Summary (with Timelog%pths) 0 '4 CD5-17 ConocoPhill>ips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dor(hr) Phase. Op Code Activity Code Time P-TA Operation (ftKB) End Depth(ftKB) 4/29/2017 4/29/2017 1.50 SURFAC CEMENT BHAH P PJSM,M/U BHA#2 to 818'MD 0.0 818.0 12:30 14:00 4/29/2017 4/29/2017 1.00 SURFAC CEMENT TRIP P Trip in hole with 5"DP from derrick 818.0 1,945.0 14:00 15:00 from 818'MD to 1,945'MD. S/0=110k. 4/29/2017 4/29/2017 1.00 SURFAC CEMENT COCF P Wash and ream to 2,039'MD @ 510 1,945.0 2,039.0 15:00 16:00 gpm, 1330 psi,40 rpm, .5k Tq while CBU,condition mud. 4/29/2017 4/29/2017 1.00 SURFAC CEMENT PRTS P R/U and pressure test surface casing 2,039.0 2,039.0 16:00 17:00 to 3500 psi for 30 minutes charted.3.3 bbl pumped to pressure up,bled back 3.3 bbl.R/D and blow down equipment. 4/29/2017 4/29/2017 0.75 SURFAC CEMENT COCF P Wash and ream down 550 gpm, 1300 2,039.0 2,138.0 17:00 17:45 psi,50 rpm.Tag top of wiper plugs on depth @ 2,138'MD 4/29/2017 4/29/2017 3.50 SURFAC CEMENT DRLG P Drill out plugs,float collar,shoe track, 2,138.0 2,232.0 17:45 21:15 shoe and rathole to 2,232'MD.Float collar @ 2,140',shoe @ 2,219'MD. 4/29/2017 4/29/2017 0.75 SURFAC CEMENT DDRL P Drill 20'new formation to 2,252'MD, 2,232.0 2,252.0 21:15 22:00 SIMOPS-displace well to 9.6 ppg LSND.P/U=125k,S/0=115k.Obtain SPR's. 4/29/2017 4/29/2017 0.50 SURFAC CEMENT BKRM P Backream out from 2,252'MD to 2,252.0 2,197.0 22:00 22:30 2,197'MD @ drilling rates 550 gpm, 50 rpm. 4/29/2017 4/29/2017 0.50 SURFAC CEMENT FIT P R/U and perform FIT to 18.0 ppg 2,197.0 2,197.0 22:30 23:00 EMW.Pumped 1.1 bbl 9.6 ppg LSND to 950 psi.Chart for 10 minutes.Blow down and rig down. 4/29/2017 4/29/2017 0.50 SURFAC CEMENT TRIP P RIH from 2,197'MD to 2,252 MD, 2,197.0 2,252.0 23:00 23:30 S/0=110k. 4/29/2017 4/30/2017 0.50 INTRM1 DRILL DDRL P Directional drill from 2,252'MD to 2,252.0 2,277.0 23:30 00:00 2,277'MD,2,027'TVD.700 gpm 1830 psi,50 rpm,2.5k Tq. P/U=123k, S/0=120k,ROT=125k,ADT=.5. 4/30/2017 4/30/2017 1.00 INTRM1 DRILL DDRL P Directional drill from 2,277'MD to 2,277.0 2,357.0 00:00 01:00 2,357'MD,2,304'TVD.ADT=.8 hrs. P/U to 2,352'MD to open Under reamer. 4/30/2017 4/30/2017 0.75 INTRM1 DRILL CIRC P Obtain parameters 650 gpm, 1630 psi, 2,357.0 2,357.0 01:00 01:45 50 rpm,2.5k Tq,MTRPM=2695.Drop 1.25"OD activation ball and pump down @ 150 gpm,140 psi,30 rpm 2k. Ball on seat @ 245 stks,pressure up to 1370 psi and observe under reamer shift.Pump 650 gpm,observe 1320 psi,50 rpm,2.5k Tq,MTRPM=2344 indicating under reamer open. Increase rate to 800 gpm, 1930 psi, MTRPM=3164.BROOH to 2,332'MD @ 800 rpm.S/D rotary and pull test against 10-3/4"shoe observe 10k overpull.2,322'bit depth.Drop back down to 2,357'MD. Page 6/34 Report Printed: 6/12/2017 operations Summary (with Timelofepths) 1 4 &Wens" e. CD5-17 ConocoPhillips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 4/30/2017 4/30/2017 10.25 INTRMI DRILL DDRL P Directional drill from 2,357'MD to 2,357.0 3,829.0 01:45 12:00 3,829'MD,3,234'TVD.Tour ADT=8.66 hrs.800 gpm @ 2420 psi,8 -12k WOB, 150 rpm,TQ on/off=7.5k/3.5k,ECD 11.0 ppg @ 200 fph.P/U=135k,S/0=125k, ROT=122k. 4/30/2017 5/1/2017 12.00 INTRM1 DRILL DDRL P Directional drill from 3,829'MD to 3,829.0 5,613.0 12:00 00:00 5,613'MD,3,965'TVD.Tour ADT=8.94 hrs.800 gpm @ 2800 psi, 10-12k WOB, 150 rpm,TQ on/off= 9k/6k,ECD 11.17 ppg @ 200 fph. P/U=140k,S/0=115k,ROT=135k. 5/1/2017 5/1/2017 12.00 INTRM1 DRILL DDRL P Directional drill from 5,613'MD to 5,613.0 7,528.0 00:00 12:00 7,528'MD,4,740'TVD.Tour ADT=9.41 hrs.800 gpm @ 3000 psi, 15-20k WOB, 150 rpm,TQ on/off= 13k/7.5k,ECD 11.25 ppg @ 200 fph. P/U=170k,S/0=145k,ROT=155k. 5/1/2017 5/2/2017 12.00 INTRM1 DRILL DDRL P Directional drill from 7,528'MD to 7,528.0 9,352.0 12:00 00:00 9,352'MD,5,483'TVD.Tour ADT= 9.04 hrs.800 gpm @ 2915 psi, 16-20k WOB, 150 rpm,TQ on/off=18k/11.5k, ECD 10.91 ppg @ 200 fph.P/U=210k, S/0=140k,ROT=160k. 5/2/2017 5/2/2017 12.00 INTRM1 DRILL DDRL P Directional drill from 9,352'MD to 9,352.0 11,184.0 00:00 12:00 11,184'MD,6,224'TVD.Tour ADT=9.09 hrs.800 gpm @ 3400 psi, 27-31k WOB, 150 rpm,TQ on/off= 23k/17k,ECD ppg @ 200 fph. P/U=255k,S/0=147k,ROT=180k. 5/2/2017 5/2/2017 8.00 INTRM1 DRILL DDRL P Directional drill from 11,184 MD to 11,184.0 12,485.0 12:00 20:00 12,485'MD,6,749'TVD.Tour ADT= _hrs.800 gpm @ 3470 psi,26k WOB, 150 rpm,TQ on/off=23- 26k/_k,ECD 11.12 ppg @ 150 fph. P/U=_k,S/O=_k,ROT=_k. 5/2/2017 5/2/2017 0.25 INTRM1 DRILL RGRP T Airboot leaking on flow line.Remove 12,485.0 12,485.0 20:00 20:15 old airboot and install new airboot. Rotate slowly while making repairs. 16 rpm,0 gpm. 5/2/2017 5/2/2017 2.25 INTRM1 DRILL DDRL P Directional drill from 12,485 MD to 12,485.0 12,674.0 20:15 22:30 12,674'MD,6,826'TVD.Tour ADT= 7.98 hrs.800 gpm @ 3500 psi,23-25k WOB, 150 rpm,TQ on/off=27k/22k, ECD 11.16 ppg @ 160 fph.P/U=300k, S/0=145k,ROT=195k. 5/2/2017 5/3/2017 1.50 INTRM1 DRILL CIRC T Circulate and condition mud @8 00 12,674.0 12,674.0 22:30 00:00 gpm,3460 psi ICP,3420 psi FCP, 180 rpm,21k TQ.Recip 12,674'MD T/ 12,580'MD 5/3/2017 5/3/2017 4.50 INTRM1 DRILL CIRC T Circulate and condition mud, 12,674.0 12,486.0 00:00 04:30 From12764 to 12,486 800 gpm,3460 -3310 psi, 180 rpm, 16-20k Tq.,Rack back 1 std per 3 BU for atotal of 2 stands and 6 BU's. 5/3/2017 5/3/2017 0.25 INTRM1 DRILL CIRC T Obtain parameters w/715 gpm,2790 12,486.0 12,486.0 04:30 04:45 psi,50 rom, 14.k Tq,TRPM=2891 5/3/2017 5/3/2017 0.25 INTRM1 DRILL OWFF T OWFF 10 min,static dropped 1"in 12,486.0 12,486.0 04:45 05:00 annulus,5-10 rpm, 12-15k Tq,0 gpm Page 7/34 Report Printed: 6/12/2017 0„. Itperations Summary (with TimeloRepths) CD5-17 ConocoPhiilips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (MKS) End Depth(8KB) 5/3/2017 5/3/2017 0.75 INTRM1 DRILL CIRC T Close under reamer,drop 1.625"OD 12,486.0 12,486.0 05:00 05:45 Deactivation ball and pump down w/ 250 gpm for 15 min and 150 gpm for 20 mi,580-390 psi,30 rpm, 12-17k Tq,recipricate slowly.Ball on seat at 1784 stks(matched calculated time to seat),pressure upto 1960 psi and observe shift close,pump 715 gpm 2860 psi,TRPM=2125 5/3/2017 5/3/2017 0.25 INTRM1 DRILL CIRC T Obtain SPR's with 9.9+ppg,under 12,486.0 12,486.0 05:45 06:00 reamer closed 5/3/2017 5/3/2017 6.00 INTRM1 DRILL TRIP T POOH on elevators12,486'MD to 12,486.0 7,033.0 06:00 12:00 10,321'MD,pump dry job,35 bbls at 7 BPM,710-580 psi,chase w/9.5 bbls 10#LSND.POOH on elevators 10,321'MD to 7,033'MD. 5/3/2017 5/3/2017 5.50 INTRM1 DRILL TRIP T POOH on elevators 7,033'MD to 7,033.0 2,200.0 12:00 17:30 2,200'MD,P/U=130,S/O=125k 5/3/2017 5/3/2017 0.25 INTRM1 DRILL OWFF T Monitor well for flow,static 2,200.0 2,200.0 17:30 17:45 5/3/2017 5/3/2017 0.75 INTRMI DRILL CIRC T CBU at 700 gpm, 1950 psi,60 rpm,3k 2,200.0 2,137.0 17:45 18:30 Tq,pump 30 bbl viscosified nut plug sweep 5/3/2017 5/3/2017 0.25 INTRM1 DRILL OWFF T Monitor well for flow 5 min,static 2,137.0 2,137.0 18:30 18:45 5/3/2017 5/3/2017 1.00 INTRM1 DRILL TRIP T POOH on elevators 2,137'MD to 818 2,137.0 818.0 18:45 19:45 MD,P/U=90k 5/3/2017 5/3/2017 0.25 INTRM1 DRILL OWFF T Monitor well for flow 5 min,static 818.0 818.0 19:45 20:00 5/3/2017 5/3/2017 2.50 INTRM1 DRILL BHAH T PJSM.lay down BHA#2 from 816'MD 818.0 0.0 20:00 22:30 to 0'MD,Heavy amounts of clay on BHA.Stabilizers packed mainly on one side. 5/3/2017 5/4/2017 1.50 INTRM1 DRILL WWWH T Clear rig floor,flush BOP stack,blow 0.0 0.0 22:30 00:00 donw line,pull wear bushing,set test plug 5/4/2017 5/4/2017 0.50 INTRM1 WHDBOP BOPE T Fill Stack and Choke Manifold with 0.0 0.0 00:00 00:30 water. 5/4/2017 5/4/2017 0.25 INTRMI WHDBOP BOPE T Function test Manual and Super 0.0 0.0 00:30 00:45 Chokes t/1,100psi to confirm pressure regulation. 5/4/2017 5/4/2017 2.75 INTRM1 WHDBOP BOPE T Test BOPE with 5"test joint as 0.0 0.0 00:45 03:30 follows: Annular 250/3,500 psi,all other 250/3,500 psi.AOGCC Bill Bixby waived witness.Tested annular, Upper and lower 3W x 6"VBR's, Choke valves#1-14,Needle valve above#1,4"Demco kill valve,HCR choke and kill,5"FOSV and Dart valve,Test Gas Alarms,flow show equipment and pit level indicators.All tests on chart 5min each pressure test.No Failures. Page 8/34 Report Printed: 6/12/2017 O'' tz !perations Summary (with Timelog!epths) CD5-17 Conocigps Adzks Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(MKS) 5/4/2017 5/4/2017 0.25 INTRM1 WHDBOP BOPE T Accumulator test: 0.0 0.0 03:30 03:45 Initial System Pressure 2,975 psi, System pressure after function 1,550 psi N2 precharge in accumulator bottles 1,000psi First 200psi in 30 seconds with single electric pump Final 3,000psi 151 seconds with electric pump and 3 air pumps., N2 Emergency Back-up Bottles 4@1,975 psi 5/4/2017 5/4/2017 0.25 INTRM1 WHDBOP BOPE T Test Blind rams 250/3,500psi-No 0.0 0.0 03:45 04:00 Failures 5/4/2017 5/4/2017 0.50 INTRM1 WHDBOP RURD T Drain stack,blow down lines and rig 0.0 0.0 04:00 04:30 down test equipment 5/4/2017 5/4/2017 0.50 INTRM1 WHDBOP RURD T Set 9.98"ID Wear Ring 0.0 0.0 04:30 05:00 5/4/2017 5/4/2017 1.75 INTRM1 DRILL BHAH T PJSM,M/U BHA to 178'MD Per SLB 0.0 178.0 05:00 06:45 5/4/2017 5/4/2017 0.25 INTRM1 DRILL TRIP T RIH f/178'MD to 2,136'MD,with 7 178.0 2,136.0 06:45 07:00 stands HWDP and 5"DP 5/4/2017 5/4/2017 1.00 INTRM1 DRILL DHEQ T Shallow test MWD w 550 gpm, 1350 2,136.0 2,136.0 07:00 08:00 psi,Test Good B/D TD 5/4/2017 5/4/2017 1.50 INTRM1 DRILL SLPC T Slip and Cut 60'Drill line,lubricate T/D 2,136.0 2,136.0 08:00 09:30 D/W&I/R 5/4/2017 5/4/2017 2.50 INTRM1 DRILL TRIP T RIH F/2,136'MD to 5,710'MD,filling 2,136.0 5,710.0 09:30 12:00 pipe every 20 stds. 5/4/2017 5/4/2017 6.00 INTRM1 DRILL TRIP T RIH f/5,710'MD to 12,488'MD, 5,710.0 12,488.0 12:00 18:00 P/U=260 S/0=130k 5/4/2017 5/4/2017 4.00 INTRM1 DRILL REAM T Wash and Ream to 12,674'MD,stage 12,488.0 12,674.0 18:00 22:00 pumps rates to 640 gpm,3150 psi,50 rpm, 10K Tq,pump,inititial 275 bbl, 9.9+ppg Dilution while CBU,Recip f/12,674'MD to 12,579'MD, 12 ppf Initial ECD,Hole unloaded large amount of clay, 10.0 ppg mud in,upto 12 ppg mud out,Stage pump rate to 715 gpm,3590 psi,gas increased to 600 units for short while then fell back to 50 units,added aditional 275 bbl 10.0 ppg black product spike,for a total of 3x BU's.P/U=240k,S/0=140K, Rot=190K, 10K Tq 5/4/2017 5/4/2017 1.25 INTRM1 DRILL CIRC T Initial parameters 715 gpm 3540 psi, 12,674.0 12,674.0 22:00 23:15 50 rpm,TRPM 3085,Tq 12.3K,Up 260k,down 160k,ROT 195k.Drop ball and open rhino reamer,6BPM 620 psi for 15 min and 85 bbls,slow to 3.5 bpm 360 psi for 37 min t/217bbls total,No sign of shear,Increase flow to 6 bpm for 16 min,no sign of shear, increase flow to 715 gpm 2950 psi,50 rpm,TRPM 2617,Tq 15.4k,Up 260k, down 160k,ROT 195k.Three positive indications reamer opened. 5/4/2017 5/4/2017 0.25 INTRM1 DRILL OWFF P Attempt to OWFF,MPD manifold on 12,674.0 12,674.0 23:15 23:30 stack blocked,unblock and OWFF 5 min.Static. Page 9/34 Report Printed: 6/12/2017 `�0 •Operations Summary (with Timelo Depths) t k CD5-17 Conoco hittips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 5/4/2017 5/5/2017 0.50 INTRM1 DRILL MPDA P Pull trip nipple and install MPD 12,674.0 12,674.0 23:30 00:00 5/5/2017 5/5/2017 0.25 INTRM1 DRILL MPDA P Break in MPD bearing 50-150 rpm, 17 12,674.0 12,674.0 00:00 00:15 -22k Tq,800 gpm 3650psi 5/5/2017 5/5/2017 11.75 INTRM1 DRILL DDRL P Directional drill from 12,674'MD to 12,674.0 13,688.0 00:15 12:00 13,688'MD,7,225'TVD.Tour ADT= 8.53 hrs.800 gpm @ 3,800 psi,33k WOB, 150 rpm,TQ on/off=26k/18k, ECD 11.60 ppg @ 150 fph.P/U=310k, S/0=150k,ROT=200k. 5/5/2017 5/6/2017 12.00 INTRM1 DRILL DDRL P Directional drill from 13,688'MD to 13,688.0 14,832.0 12:00 00:00 14,832'MD,7,497'TVD.Tour ADT= 8.86 hrs.800 gpm @ 3970 psi,27k WOB, 150 rpm,TQ on/off=28k/21 k, ECD 11.55 ppg @ 120 fph.P/U= 300k,S/O=143k,ROT=190k. 5/6/2017 5/6/2017 12.00 INTRM1 DRILL DDRL P Directional drill from 14,832'MD to 14,832.0 15,575.0 00:00 12:00 15,575'MD,7,576'TVD.Tour ADT= 9.23 hrs.800 gpm @ 3,840 psi,25k WOB, 130 rpm,TQ on/off=29k/27.5k, ECD 11.38 ppg @ 50 fph.P/U=310k, S/0=138k,ROT=200k. 5/6/2017 5/6/2017 4.50 INTRM1 DRILL DDRL P Directional drill from 15,575'MD to 15,575.0 15,846.0 12:00 16:30 15,846'MD,7,615'TVD.Tour ADT= 3.39 hrs.800 gpm @ 3,870 psi,25k WOB, 120 rpm,TQ on/off=30k/25k, ECD 11.44 ppg @ 105 fph.P/U=320k, S/0=130k,ROT=200k. 5/6/2017 5/6/2017 4.00 INTRM1 CASING CIRC P Circulate 3 BU's and weight up sustem 15,846.0 15,846.0 16:30 20:30 from 10.3 to 10.5 ppg at 800 gpm 3800 psi,140 rpm,27k Tq..REcip F/15,846'MD to Rack back one stand. 5/6/2017 5/6/2017 0.25 INTRM1 CASING RGRP T Rig Pump#1 rod wash system broke 15,846.0 15,846.0 20:30 20:45 a T.T was replaced. No fluids spilled. Operated with one pump and deminished capacity. 5/6/2017 5/6/2017 1.75 INTRM1 CASING CIRC P Continue to circulate and weight up t/ 15,846.0 15,693.0 20:45 22:30 10.5 ppg,recip f/15,788'MD to15,693' MD,P/U=310k,S/O=130k,ROT= 190k,Tq=24k$x BU Total 5/6/2017 5/6/2017 0.50 INTRM1 CASING CIRC P Perform Fingerprint Test at 15,788' 15,693.0 15,693.0 22:30 23:00 MD,ROT at 10 rpom,23k Tq,Chokes closed 1-2 psi build,no build after 10 min 5/6/2017 5/7/2017 1.00 INTRM1 CASING CIRC P Circulate BU and weight up from 10.5 15,693.0 15,693.0 23:00 00:00 ppg to 10.8 ppg,800 gpm,3980 psi, 120 rpm,24k Tq.MWD signal maintained, ECD 11.58, 10.6 ppg MW achieved at midnight. 5/7/2017 5/7/2017 1.75 INTRM1 CASING CIRC P Cont.to weight up to 10.8 ppg at 800 15,693.0 15,693.0 00:00 01:45 gpm 4030 psi, 120 rpm,23k Tq,Rack back one stand per BU 5/7/2017 5/7/2017 0.25 INTRM1 CASING CIRC P Obtain parameters before ball drop to 15,693.0 15,693.0 01:45 02:00 clsoe under reamer,690 gpm,3220 psi,50 rpm,24 Tq,Rot=200k,P/U= 259k,S/O= 137k,TRPM=2500. Drop 1.625"Torlon Ball as per SLB Page 10/34 Report Printed: 6/12/2017 0 0 Operations Summary (with TimeloRepths) CD5-17 r'hitiaps #kxaka Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Antiuity Code Time P-T-X Opera('pn MICE) End Depth(ftKS) 5/7/2017 5/7/2017 0.75 INTRM1 CASING CIRC P circ ball downw/250-150 gpm 820-590 15,693.0 15,693.0 02:00 02:45 psi,30 rpm,21-221 Tq,Shear out with 2190 psi at 2215 strokes. Bring pumps up tp 690 gpm 3560 psi,50 rpm,21k Tq,TRPM=2968,Three positive indications reamer is closed. 5/7/2017 5/7/2017 0.25 INTRM1 CASING CIRC P obtain new SPR's 15,693.0 15,693.0 02:45 03:00 5/7/2017 5/7/2017 0.25 INTRM1 CASING OWFF P OWFF(Static)w/10 rpm,22k Tq 15,693.0 15,693.0 03:00 03:15 5/7/2017 5/7/2017 0.25 INTRM1 CASING MPDA P B/D and line up MPD to Strip out of 15,693.0 15,693.0 03:15 03:30 hole 5/7/2017 5/7/2017 1.75 INTRM1 CASING SMPD P SOOH f/15,693'MD to 14,553'MD 15,693.0 14,553.0 03:30 05:15 holding back pressure 420/260 in/out slips,encounter tight spots f/14,617' MD to 14,553'MD.Overpull 55k at 14,553'MD,attempt to pull through unsuccesfull,decision made to CBU and BROOH 5/7/2017 5/7/2017 2.75 INTRM1 CASING CIRC T Break circulation w/2 BPM 420 psi,30 14,553.0 14,553.0 05:15 08:00 rpm,22k Tq,stage pumps to 690 gpm 3480-3430 psi, 100 rpm, 18-19.5k Tq,CBU 2x 5/7/2017 5/7/2017 4.00 INTRM1 CASING BKRM P BROOH f/14,561'MD to 13,901'MD 14,553.0 13,901.0 08:00 12:00 w/690 gpm 3440 psi, 100 rpm, 19k Tq 5/7/2017 5/7/2017 9.50 INTRM1 CASING BKRM P BROOH f/13,901'MD at 120 rpm,22k 13,901.0 12,676.0 12:00 21:30 Tq,690 gpm 3440 psi, 11.6-11.8 ECD/ at 13,700'MD reduce rotary to 50 rpm, 20-22k Tq for HRZ,continue to BROOH to above HRZ,at 13,100'MD increase rotary to 120 rpm,20K Tq, 690 gpm,3250 psi, 11.5 ecd to 12,676'MD 5/7/2017 5/8/2017 2.50 INTRM1 CASING CIRC T Circulate and condition mud at 690 12,676.0 12,492.0 21:30 00:00 gpm 3200 psi, 120 rpm, 19k Tq, 11.57 ECD,rack back one stand per BU,to 12,492'MD,BU 2x„P/U=265k, S/0=147k,ROT=198k, 17k Tq 5/8/2017 5/8/2017 1.50 INTRM1 CASING CIRC T Cont 3rd BU w/690 gpm 3220 psi,210 12,492.0 12,395.0 00:00 01:30 rpm, 19.5k tq, F/12,492'MD to 12,395' MD,Perform 275 bbl dilution,racking 1 stand back per BU 5/8/2017 5/8/2017 2.00 INTRM1 CASING CIRC T Continue CBU 2x w/690 gpm 3100 12,395.0 12,395.0 01:30 03:30 psi, 120 rpm, 17k Tq 5/8/2017 5/8/2017 0.25 INTRM1 CASING OWFF T OWFF(static), 10 min, 10 rpm, 16k 12,395.0 12,395.0 03:30 03:45 Tq 5/8/2017 5/8/2017 0.25 INTRMI CASING RURD P B/D TD,line up to strip out of hole, 12,395.0 12,395.0 03:45 04:00 P/U=250k S/O=140k 5/8/2017 5/8/2017 5.75 INTRMI CASING SMPD P SOOH f/12,395 to 7,553'MD working 12,395.0 7,553.0 04:00 09:45 pipe through tight spots,35-55k overpull,holding back pressure 260/400 psi in/out of slip,pull 60k over (250k)(P/U=190k)at 7,553'MD, Decision made to RIH 2 stand,CBU 2x.Tight spots: 12368, 12363, 12258, 12244, 12237, 10265,8301,8268, 8194,8180,7913,7794,7680,7553' MD Page 11/34 Report Printed: 6/12/2017 Operations Summary (with Timelog epths) 0 r� • CD5-17 Conoco liflips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Der(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKE) End.Depth(ftKB) 5/8/2017 5/8/2017 0.25 INTRM1 CASING TRIP T RIH f/7,553'MD to 7,747'MD 7,553.0 7,747.0 09:45 10:00 P/U=190k S/O 125k 5/8/2017 5/8/2017 1.25 INTRM1 CASING CIRC T at 7,747'MD break circulation w/2 BM 7,747.0 7,687.0 10:00 11:15 250 psi,40 rpm, 11 k Tq,stage pumps to 690 gpm 2670 psi, 120 rpm,9k Tq 5/8/2017 5/8/2017 0.75 INTRMI CASING CIRC T Rotate and reciprocate f/7,782'MD to 7,687.0 7,782.0 11:15 12:00 7,687'MD,pump 43 bbl visc nut plug sweep w/690 gpm 2670 psi, 120 rpm, 9k Tq 5/8/2017 5/8/2017 0.50 INTRM1 CASING CIRC T Condition mud and circulate t 690 7,687.0 7,782.0 12:00 12:30 gpm,2650 psi, 120 rpm, 10 Tq, reciprocate 7,782'MD to 7,687'MD 5/8/2017 5/8/2017 1.00 INTRM1 CASING SMPD T attempt to SOOH f/7,782'MD to 7,782.0 7,593.0 12:30 13:30 7,593'MD w/230 psi back pressure, encounter overpull, P/U=200 k,stage up to 25-45k overpull 5/8/2017 5/8/2017 8.50 INTRM1 CASING BKRM P BROOH w/MPD ramp connection, 7,593.0 6,083.0 13:30 22:00 holding 230 psi,f/7,593'MD to 6,083' MD at 690 gpm, 120 rpm,8k Tq, 11.43 ECD 5/8/2017 5/9/2017 2.00 INTRM1 CASING BKRM P BROOH f/6,083'MD to 5,710'MD 6,083.0 5,710.0 22:00 00:00 with full open chokes at 690 gpm 2400 psi, 120 rpm, 10k Tq,ROT= 145k, 8kTq 5/9/2017 5/9/2017 0.50 INTRM1 CASING BKRM P BROOH f/5,710'MD to 5,615'MD 5,710.0 5,615.0 00:00 00:30 with full open chokes at 690 gpm 2400 psi, 120 rpm,8.5k Tq. 5/9/2017 5/9/2017 1.00 INTRM1 CASING CIRC P Circulate 2x BU at 690 gpm,2450 psi, 5,615.0 5,521.0 00:30 01:30 120 rpm,8.5k TQ. SimOps,held pre job for removing bearing. 5/9/2017 5/9/2017 0.25 INTRM1 CASING OWFF P OWFF,Well Static. 5,521.0 5,521.0 01:30 01:45 5/9/2017 5/9/2017 0.75 INTRM1 CASING MPDA P Removed RCD bearing and installed 5,521.0 5,521.0 01:45 02:30 trip nipple. 5/9/2017 5/9/2017 12.00 INTRM1 CASING BKRM P BROOH f/5,562'to 2,222;MD w/690 5,521.0 2,222.0 02:30 14:30 gpm,2050 psi, 120 rpm,8-2k TQ. 5/9/2017 5/9/2017 0.50 INTRM1 CASING CIRC P Pumped 30 bbl Nut Plug sweep and 2,222.0 2,222.0 14:30 15:00 circulated hole clean w/690 gpm, 2050 psi, 100 rpm,3k TQ. P/U=125, S/O= 122. 5/9/2017 5/9/2017 1.50 INTRM1 CASING TRIP P OWFF and POOH f/2,222'to 820' 2,222.0 820.0 15:00 16:30 MD. 5/9/2017 5/9/2017 1.00 INTRM1 CASING BHAH P R/B HWDP,Jars,and L/D saver sub. 820.0 175.0 16:30 17:30 5/9/2017 5/9/2017 1.50 INTRMI CASING BHAH P L/D BHA as per SLB. 175.0 0.0 17:30 19:00 5/9/2017 5/9/2017 2.00 INTRM1 CASING RURD P Clean and clear rig floor. Pull wear 0.0 0.0 19:00 21:00 bushing. R/U Volant tool,bail extensions and elevators. 5/9/2017 5/9/2017 1.00 INTRM1 CASING BOPE P Installed test plug and tested top 7 0.0 0.0 21:00 22:00 5/8"rams and annular w/7 5/8"test joint. Annular 250/2500 psi,Top ram to 250/3500 psi. 5/9/2017 5/9/2017 1.00 INTRM1 CASING BOPE P R/D test equipment,pull test plug and 0.0 0.0 22:00 23:00 installed casing running wear ring. 5/9/2017 5/9/2017 0.50 INTRM1 CASING RURD P Finished R/U casing running 0.0 0.0 23:00 23:30 equipment. Page 12/34 Report Printed: 6/12/2017 0.1 It perations Summary (with TimeloPepths) 0 CD5-17 ccxvoc*to ps A1,a ka Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Cur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKE3) 5/9/2017 5/10/2017 0.50 INTRM1 CASING SVRG P Serviced rig,inspected and lubricated 0.0 0.0 23:30 00:00 TD and drawworks. 5/10/2017 5/10/2017 12.00 INTRM1 CASING PUTB P RIH with 7 5/8"casing as per tally to 0.0 5,665.0 00:00 12:00 5,665'MD. M/U shoe track w/ Bakerlok and verified floats held. Installed bow spring centralizers 3/2 joints from shoe track to 2580'while RIH. No centralizers on jnts#24-27 for whipstock and window. 5/10/2017 5/10/2017 1.00 INTRM1 CASING CIRC P Circulated BU.Staged pumps up to 5,665.0 5,705.0 12:00 13:00 5.5 bpm w/220 psi. P/U=175,S/0= 140. 5/10/2017 5/10/2017 6.50 INTRM1 CASING PUTB P Continue RIH w/7 5/8"casing f/5,705' 5,705.0 9,256.0 13:00 19:30 to 9,256'MD. S/0=150. 5/10/2017 5/10/2017 0.50 INTRM1 CASING CIRC P Broke circulation and pumped 50 bbl 9,256.0 9,256.0 19:30 20:00 staging up to 3 bpm,200 psi. P/U= 300,S/O=150. 5/10/2017 5/11/2017 4.00 INTRM1 CASING PUTB P Continued RIH f/9,256'to 10,936'MD. 9,256.0 10,936.0 20:00 00:00 Installed HES Stage tool and Bakerloked pin/box. Installed bow spring centralizers 3/2 jts from jt#247- 259. 5/11/2017 5/11/2017 4.00 INTRM1 CASING PUTB P RIH f/10,936'to 12,981'MD with 7 10,936.0 12,981.0 00:00 04:00 5/8"casing. 5/11/2017 5/11/2017 0.50 INTRM1 CASING CIRC P Break circulation w/1.5 bpm,420 psi 12,981.0 12,981.0 04:00 04:30 and attempt to reciprocate pipe. worked up to 435k P/U and decided to continue running casing. 5/11/2017 5/11/2017 9.00 INTRM1 CASING PUTB P RIH w/7 5/8"casing f/12,981'to 12,981.0 15,793.0 04:30 13:30 15,793'MD as per tally. S/0=125. 5/11/2017 5/11/2017 0.50 INTRM1 CASING HOSO P M/U hanger and landing joint. Land 15,793.0 15,831.0 13:30 14:00 casing @ 15,831'MD,S/O=125. 5/11/2017 5/11/2017 7.00 INTRM1 CEMENT CIRC P Circulate and conditioned mud for cmt 15,831.0 15,831.0 14:00 21:00 job. Staged pumps up from 1/2 bpm to 8 bpm as old mud was circulated out,425-810 psi. Attempted to reciprocate pipe w/425k P/U with out breaking over. SimOps,rigged up cmt lines. 5/11/2017 5/11/2017 2.00 INTRM1 CEMENT CMNT P Held Prejob,tested lines to 4000 psi, 15,831.0 15,831.0 21:00 23:00 and pumped 40 bbl of 12.5 ppg MudPush II at 4 bpm. Dropped bottom dart and chased with 184 bbl of 15.8 ppg cmt at 4.8 bpm,400 psi. Dropped top dart and chased with 10 bbl of water from the cmt unit. 5/11/2017 5/12/2017 1.00 INTRM1 CEMENT CMNT P Start displacement with 10.8 ppg 15,831.0 15,831.0 23:00 00:00 LSND at 8 bpm,420 psi. Pumped 380 bbl. 5/12/2017 5/12/2017 1.00 INTRM1 CEMENT CMNT P Finish displacing 1st stage cmt w/8 0.0 0.0 00:00 01:00 bpm,400-1130 psi.Slowed the last 15 bbl to 3 bpm and bumped plug @ 7102 stks. Pressured up to 1200 psi and held for 5 min. Bleed off and checked floats. floats held. 5/12/2017 5/12/2017 1.25 INTRM1 CEMENT CIRC P Pressured up to 3090 psi and opened 0.0 0.0 01:00 02:15 stage tool as per HES. proceeded to pump 550 bbl surface to surface at 8 bpm,510 psi. Page 13/34 Report Printed: 6/12/2017 0 v. ` operations Summary (with TimeloPepths) CD5-17 ConocoPhitHps Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(Er) Phase Op Code Activity Code Time P-T-X Operation ORB) End Depth(ftKB) 5/12/2017 5/12/2017 1.75 INTRM1 CEMENT CMNT P Pumped 40.1 bbl of 12.5 ppg 0.0 0.0 02:15 04:00 MudPush II followed by 48 bbl of 15.8 ppg cmt. Dropped closing plug and chased with 10 bbl of water. Swapped over to rig pumps and displaced at 8 bpm,300-600 psi. Slowed pumps to 4 bpm and landed plug at 2619 stk. Pressured up to 2000 psi to close stage tool and held for 5 min. Bleed off and confirmed tool closed. "CMT IN PLACE 03:45" 5/12/2017 5/12/2017 0.50 INTRM1 CEMENT RURD P B/D cmt lines and R/D cement 0.0 0.0 04:00 04:30 equipment. Back out landing joint and L/D. Drained stack. 5/12/2017 5/12/2017 1.50 INTRM1 CEMENT WWSP P Retrieved wear ring and installed 0.0 0.0 04:30 06:00 packoff as per FMC. Tested packoff to 5000 psi for 10 min.SimOps, L/D Volant tool,R/U 5"elevators,and removed skate roller. 5/12/2017 5/12/2017 17.75 INTRM1 CEMENT PULD P L/D 20 jts of 5"HWDP,jars,and 160 0.0 0.0 06:00 23:45 stands of 5"DP. SimOps,ball mill performed freeze protect w/84 bbl of diesel. 5/12/2017 5/13/2017 0.25 INTRM1 CEMENT RURD P Changed out saver sub from 5"to 4" 0.0 0.0 23:45 00:00 XT-39. 5/13/2017 5/13/2017 0.25 INTRM1 CEMENT RURD P Changed out saver sub from 5"to 4" 0.0 0.0 00:00 00:15 XT-39. 5/13/2017 5/13/2017 0.75 INTRM1 WHDBOP RURD P P/U Test plug and set. R/U to test 0.0 0.0 00:15 01:00 BOPE and B/D chokes. 5/13/2017 5/13/2017 0.75 INTRM1 WHDBOP RURD P Fill stack with H2O and purge system 0.0 0.0 01:00 01:45 of air. 5/13/2017 5/13/2017 5.25 INTRM1 WHDBOP BOPE T Tested BOPE,Test witnessed by 0.0 0.0 01:45 07:00 AOGCC Guy Cook. Tested rig alarms and pit sensors. Tested annular 4" Demco,valves 1-14,auto and manual IBOP,needle valve,HRC choke and kill,mannual choke and kill,4"dart, FOSV,3.5"x 6"VBRs w/4"and 4.5" test joints,and blind rams to 250/3500 psi for 5 min. Tested manual and supper chokes to 1500 psi and bleed off. Performed accumulator test. Starting pressure 3010 psi,after functioning 1475 psi. 20 psi build in 31 sec,fully charged in 153 sec. N2 average=1881 psi. 5/13/2017 5/13/2017 0.75 INTRM1 WHDBOP RURD P B/D choke and kill lines. Removed 0.0 0.0 07:00 07:45 test plug and installed 7.25"wear ring. 5/13/2017 5/13/2017 1.25 INTRM1 CEMENT RURD P Installed bell guide and safety wire. 0.0 0.0 07:45 09:00 installed split bushings and 4" elevators. 5/13/2017 5/13/2017 1.75 INTRM1 CEMENT BHAH P M/U 6 3/4"A sand production BHA as 0.0' 335.0 09:00 10:45 per SLB to 335'MD. 5/13/2017 5/13/2017 2.50 INTRM1 CEMENT PULD P Single in the hole w/4"DP from shed 335.0 2,222.0 10:45 13:15 f/335'to 2,222'MD. 5/13/2017 5/13/2017 0.25 INTRM1 CEMENT DHEQ P Shallow test MWD at 220 gpm, 1420 2,222.0 2,222.0 13:15 13:30 psi. Test Good. 5/13/2017 5/13/2017 3.75 INTRM1 CEMENT PULD P Single in f/2,222'to 5,727'MD filling 2,222.0 5,727.0 13:30 17:15 pipe every 20 stands. Page 14/34 Report Printed: 6/12/2017 • ' operations Summary (with Timelog Depths) 0 CD5-17 CtanocoPhillips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P T-X Operation (ftKB) End Depth(ftKB) 5/13/2017 5/13/2017 1.25 INTRM1 CEMENT COCF P Wash and ream down f/5,727'to 5,727.0 5,927.0 17:15 18:30 5,927'MD w/180 gpm, 1270 psi,60 rpm,ad 3.5k TQ. Top of cmt tagged at 5,902'MD. 5/13/2017 5/13/2017 1.00 INTRMI CEMENT DRLG P Drilled out stage collar with 180 gpm, 5,927.0 5,929.0 18:30 19:30 1270 psi,60 rpm,and 5k Tq. Polished off collar and drifted through. P/U= 122,S/O=95,ROT=110. 5/13/2017 5/13/2017 1.00 INTRM1 CEMENT COCF P Washed and reamed down 3 stands f/ 5,929.0 6,594.0 19:30 20:30 5,292'to 6,294'MD w/250 gpm,2160 psi,60 rpm,and 4.5k TQ. 5/13/2017 5/13/2017 3.00 INTRM1 CEMENT PULD P Single in hole f/6,294'to 9,025'MD. 6,594.0 9,025.0 20:30 23:30 5/13/2017 5/14/2017 0.50 INTRM1 CEMENT SLPC P Slip and cut 90'of DL. 9,025.0 9,025.0 23:30 00:00 5/14/2017 5/14/2017 0.50 INTRM1 CEMENT SLPC P Slip and cut 90'of DL. 9,025.0 9,025.0 00:00 00:30 5/14/2017 5/14/2017 0.50 INTRM1 CEMENT SVRG P Serviced TD,and blocks. 9,025.0 9,025.0 00:30 01:00 5/14/2017 5/14/2017 0.75 INTRMI CEMENT QEVL P Break circulation and activate sonic 9,025.0 9,119.0 01:00 01:45 logging tool w/250 gpm,2550 psi,50 rpm,and 8.5 TQ. P/U=156,S/O= 102,ROT=125. Logged free ringing pipe f/9,025'to 9,119'MD. 5/14/2017 5/14/2017 1.75 INTRM1 CEMENT QEVL P RIH w/4"14#DP f/9,119'to 11,012' 9,119.0 11,012.0 01:45 03:30 MD. P/U=185,S/O=95. 5/14/2017 5/14/2017 7.00 INTRM1 CEMENT QEVL P Activate sonicscope memory mode 11,012.0 14,610.0 03:30 10:30 and log f/11,012'to 14,610'MD at 900 ft/hr. 5/14/2017 5/14/2017 0.75 INTRM1 CEMENT QEVL P Logged RA Tag f/14,610'to 14,649' 14,610.0 14,649.0 10:30 11:15 MD @ 200 ft/hr w/250 gpm,2700 psi, 60 rpm,and 12.5k TQ. RA tag @ 14,588.5'MD. 5/14/2017 5/14/2017 1.00 INTRM1 CEMENT QEVL P Logged Alpine C f/14,649'to 14,834' 14,649.0 14,834.0 11:15 12:15 MD @ 200 ft/hr,240 gpm,2590 psi. 5/14/2017 5/14/2017 1.75 INTRM1 CEMENT QEVL P Continue sonic logging cmt f/14,834' 14,834.0 15,575.0 12:15 14:00 to 15,575'MD at 900 ft/hr. Installed WWT SS, 1/jt. 5/14/2017 5/14/2017 0.50 INTRM1 CEMENT RURD P Rigged up to pressure test casing. 15,575.0 15,575.0 14:00 14:30 5/14/2017 5/14/2017 1.25 INTRM1 CEMENT PRTS P Pressure test casing to 3800 psi and 15,575.0 15,575.0 14:30 15:45 held for 30 min. Test Held. 5/14/2017 5/14/2017 0.25 INTRM1 CEMENT RURD P R/D testing equipment. 15,575.0 15,575.0 15:45 16:00 5/14/2017 5/14/2017 0.75 INTRM1 CEMENT COCF P washed and reamed down f/15,575' 15,575.0 15,883.0 16:00 16:45 to 15,696'MD w/240 gpm,2550 psi, 50 rpm, 12.5 TQ, 5/14/2017 5/14/2017 4.75 INTRM1 CEMENT DRLG P Drilled out shoe track f/15,696 to 15,883.0 15,833.0 16:45 21:30 15,833'MD w/180-245 gpm, 1760- 3190 psi, 15-19k TQ,and 60 rpm. Baffle collar came in at 15,696',F/C at 15,737',and shoe at 15,820'MD. Once out of the shoe a pack off was observed and 30 bbl were lost to formation. 5/14/2017 5/14/2017 0.75 INTRM1 CEMENT CIRC T Pulled back in to the shoe and 15,833.0 15,833.0 21:30 22:15 established stable conditions. No losses observed at 240 gpm, 11.8 ppg ECD. Polished shoe 2x. Page 15/34 Report Printed: 6/12/2017 0 operations Summary (with Timelog''epths) ,0 CD5-17 cono irr Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 5/14/2017 5/14/2017 1.00 INTRM1 CEMENT DDRL P Drilled rat hole and 20'of new 15,833.0 15,866.0 22:15 23:15 formation to 15,866'MD w/220 gpm, 2320 psi,60 rpm, 16.5-18k TQ. 5/14/2017 5/15/2017 0.75 INTRM1 CEMENT CIRC P Pulled back in to shoe to 15,809'MD 15,866.0 15,809.0 23:15 00:00 and started CBU for FIT test. 200 gpm,2330 psi. 5/15/2017 5/15/2017 1.00 INTRM1 CEMENT CIRC P CBU for FIT test. 200 gpm,2330 psi. 15,809.0 15,809.0 00:00 01:00 5/15/2017 5/15/2017 0.25 INTRM1 CEMENT OWFF P OWFF,slight flow. 15,809.0 15,809.0 01:00 01:15 5/15/2017 5/15/2017 1.25 INTRM1 CEMENT FIT P Performed LOT to 12.1 ppg EMW w/ 15,809.0 15,809.0 01:15 02:30 10.6 ppg mud to 7605'MD at 600 psi. Bleed off pressure and R/D equipment. Pumped 2.5 bbl,received 2.5 bbl. 5/15/2017 5/15/2017 0.50 PROD1 DRILL MPDA P Removed Trip nipple and installed 15,809.0 15,809.0 02:30 03:00 RCD bearing. Broke in bearing with 220 gpm,2590 psi,50 rpm, 16.5k TQ. 5/15/2017 5/15/2017 0.50 PROD1 DRILL REAM P Washed and reamed back to bottom 15,809.0 15,866.0 03:00 03:30 at 15866'MD w/210 gpm,2240 psi, 17.5k TQ. 5/15/2017 5/15/2017 8.50 PROD1 DRILL DDRL P Drilled f/15,866'to 16,780'MD w/15k 15,866.0 16,780.0 03:30 12:00 WOB, 140 rpm,280 gpm,2450 psi, 10.43 ECD,P/U=207,S/O=120, ROT=153. Displaced to 9 ppg FloPro on the fly. 5/15/2017 5/16/2017 12.00 PROD1 DRILL DDRL P Drilled f/16,780'to 18,216'MD,7626' 16,780.0 18,216.0 12:00 00:00 TVD. 10.63 ppg ECD, 150 rpm, 13k TQ,20k WOB,260 gpm,2650 psi, P/U=206,SIO=122,ROT=152. 5/16/2017 5/16/2017 9.00 PROD1 DRILL DDRL P Drilled f/18,216'to 19,583'MD,7628' 18,216.0 19,583.0 00:00 09:00 TVD. 10.91 ppg ECD, 150 rpm, 19k TQ, 16k WOB,260 gpm,2910 psi, P/U=210,S/O=115,ROT=149. 5/16/2017 5/16/2017 2.50 PROD1 DRILL SMPD T A Wash out occurred in the pump 19,583.0 17,398.0 09:00 11:30 room flow line and took the pumps off line. SOOH f/19,583'to 17,398'MD while cleaning and patching the flow line. Held 100/50 psi out/in slips. Once patched the mud lines were pressure tested to 5000 psi. 5/16/2017 5/16/2017 2.00 PROD1 DRILL TRIP T Ran back to bottom at 19,583'MD. 17,398.0 19,583.0 11:30 13:30 Washed down the last stand at 260 gpm,2850 psi. 5/16/2017 5/16/2017 1.25 PROD1 DRILL DDRL P Drilled f/19,583'to 19,742'MD 19,583.0 19,742.0 13:30 14:45 5/16/2017 5/16/2017 0.25 PROD1 DRILL OWFF P P/U to 19,647'MD and OWFF. Well 19,742.0 19,647.0 14:45 15:00 static. 5/16/2017 5/16/2017 1.00 PROD1 DRILL MPDA P Installed new RCD bearing and broke 19,647.0 19,647.0 15:00 16:00 in w/260 gpm,2980 psi,50/100 rpm, 8.5k TQ. 5/16/2017 5/17/2017 8.00 PROD1 DRILL DDRL P Drilled f/19,742'to 20,844'MD,7,655' 19,647.0 20,844.0 16:00 00:00 TVD w/11.05 ppg ECD, 150 rpm,25k WOB, 160 gpm,2910 psi,P/U=220, S/O=110,ROT=148. Page 16/34 Report Printed: 6/12/2017 0:. operations Summary (with TimeloRepths) 0 __________ CD5-17 Conocatuilips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log_ Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 5/17/2017 5/17/2017 12.00 PROD1 DRILL DDRL P Drilled f/20,844'to 22,408'MD,7,674' 20,844.0 22,408.0 00:00 12:00 TVD w/11.29 ppg ECD, 150 rpm, 15k WOB,260 gpm,3150 psi,P/U=230, S/O=N/A,ROT= 145. 5/17/2017 5/18/2017 12.00 PROD1 DRILL DDRL P Drilled f/22,408'to 24,075'MD,7,693' 22,408.0 24,075.0 12:00 00:00 TVD w/11.66 ppg ECD, 150 rpm,24k WOB,260 gpm,3490 psi,P/U=238, S/O=N/A,ROT=144. 5/18/2017 5/18/2017 9.00 PROD1 DRILL DDRL P Drilled f/24,075'to 25,000'MD,7,706' 24,075.0 25,000.0 00:00 09:00 TVD w/11.72 ppg ECD, 150 rpm, 12k WOB,260 gpm,3650 psi,P/U=250, S/O=N/A, ROT=170. 5/18/2017 5/18/2017 4.75 PROD1 DRILL DDRL X Drilled f/25,000'to 25,553'MD,7,706' 25,000.0 25,553.0 09:00 13:45 TVD w/11.9 ppg ECD, 150 rpm, 14k WOB,260 gpm,3700 psi,P/U=250, S/O=N/A,ROT=142. 5/18/2017 5/18/2017 1.00 PROD1 DRILL CIRC X Racked back a stand and circulated at 25,553.0 25,456.0 13:45 14:45 260 gpm,3650 psi,80 rpm, 14.5k TQ. OWFF,well static. 5/18/2017 5/18/2017 0.75 PROD1 DRILL MPDA X Pulled RCD bearing and installed trip 25,456.0 25,553.0 14:45 15:30 nipple. Broke circulation and washed back to bottom at 25,553'MD w/260 gpm,3570 psi,30 rpm, 10.5k TQ. 5/18/2017 5/19/2017 8.50 PROD1 DRILL DDRL X Drilled f/25,553'to 26,503'MD,7,718' 25,553.0 26,503.0 15:30 00:00 TVD w/11.92 ppg ECD, 150 rpm, 18k WOB,260 gpm,3730 psi,P/U=244, S/O=N/A,ROT=142. 5/19/2017 5/19/2017 12.00 PROD1 DRILL DDRL X Drilled f/26,503'to 27,647'MD,7,694' 26,503.0 27,647.0 00:00 12:00 TVD w/11.69 ppg ECD, 150 rpm,20k WOB,260 gpm,3900 psi,P/U=222, S/O=N/A,ROT=150. 5/19/2017 5/20/2017 12.00 PROD1 DRILL DDRL X Drilled f/27,647'to 28,578'MD,7,647' 27,647.0 28,578.0 12:00 00:00 TVD w/12.06 ppg ECD, 150 rpm,20k WOB,260 gpm,4030 psi,P/U=265, S/O=N/A,ROT= 144. 5/20/2017 5/20/2017 0.75 PROD1 DRILL DDRL X Drilled f/28,578'to TD @ 28,645'MD, 28,578.0 28,645.0 00:00 00:45 7,641'TVD w/12.21 ppg ECD, 150 rpm, 15k WOB,260 gpm,3840 psi,P/U=265,SIO=N/A,ROT=145. "Longest well in AK to date" 5/20/2017 5/20/2017 13.00 PROD1 CASING CIRC P Circulated well clean while racking 28,645.0 28,034.0 00:45 13:45 back stands to 28,034'MD w/260 gpm,3970 psi, 120 rpm, 14.5k TQ. 5/20/2017 5/20/2017 3.25 PROD1 CASING DISP P Displaced well to 9.5 ppg viscosified 28,034.0 28,034.0 13:45 17:00 brine at 290 gpm,3240 psi, 120 rpm, and 14k TQ. 5/20/2017 5/20/2017 0.50 PROD1 CASING OWFF P OWFF,slight drop. 28,034.0 28,034.0 17:00 17:30 5/20/2017 5/20/2017 3.50 PROD1 CASING BKRM X BROOH f/28,024'to 26,218'MD w/ 28,034.0 26,218.0 17:30 21:00 260 gpm,2990 psi,120 rpm,and 18k TQ. Dropped 2.1"hollow drift on stand#290. Checked S/O at 26,218' MD with 90k. 5/20/2017 5/20/2017 2.00 PROD1 CASING CIRC X Circulated BU w/280 gpm,3270 psi, 26,218.0 26,218.0 21:00 23:00 120 rpm,and 13.5k TQ. 5/20/2017 5/21/2017 1.00 PROD1 CASING TRIP X POOH on elevators f/26,218'to 26,218.0 25,353.0 23:00 00:00 25,353'MD. Page 17/34 Report Printed: 6/12/2017 • operations Summary (with Timeiog�epths) 0t CD5-17 conacithps - .BLa:ka Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 5/21/2017 5/21/2017 3.75 PROD1 CASING TRIP P POOH on elevators f/25,353'to 25,353.0 20,218.0 00:00 03:45 20,156'MD and pulled in to tight spot w/30-40k overpull.Worked back down below tight spot to 20,218'MD. P/U=235,SIO=120. 5/21/2017 5/21/2017 2.25 PROD1 CASING BKRM P BROOH f/20,218'to 20,027'MD w/ 20,218.0 20,027.0 03:45 06:00 280 from,2730-1510 psi, 100 rpm, and 10-9k TQ. Observed pack off at 20,156'MD and worked several times. Wiped entire section down to ensure clear and backereamed out. 5/21/2017 5/21/2017 0.75 PROD1 CASING CIRC P Circulated 1.5x open hole volume at 20,027.0 19,932.0 06:00 06:45 280 gpm,2660 psi, 120 rpm,9k TQ. OWFF,well static. 5/21/2017 5/21/2017 2.75 PROD1 CASING TRIP P POOH f/19,932'to 15,747'MD. P/U= 19,932.0 15,747.0 06:45 09:30 225,S/O= 120. 5/21/2017 5/21/2017 1.25 PROD1 CASING CIRC P Circulated BU at shoe w/280 gpm, 15,747.0 15,747.0 09:30 10:45 2390 psi, 120 rpm,7-5.5k TQ. 5/21/2017 5/21/2017 0.75 PROD1 CASING OWFF P OWFF,Well Static. Pump 25 bbl 15,747.0 15,747.0 10:45 11:30 11.5#dry job. 5/21/2017 5/21/2017 6.50 PROD1 CASING TRIP P POOH f/15,747'to 992'MD. 15,747.0 992.0 11:30 18:00 5/21/2017 5/21/2017 0.50 PROD1 CASING PULD P L/D 7 stands 4"14#DP in pipe shed f/ 992.0 335.0 18:00 18:30 992'to 335'MD. 5/21/2017 5/21/2017 0.25 PROD1 CASING OWFF P OWFF,Well Static. 335.0 335.0 18:30 18:45 5/21/2017 5/21/2017 1.50 PROD1 CASING BHAH P UD 6 3/4"BHA as per SLB. Trip calc 335.0 0.0 18:45 20:15 fill=160.6 bbl. Actual=250.5 bbl. 5/21/2017 5/21/2017 1.50 COMPZ1 CASING RURD P Clean and clear floor,rig up double 0.0 0.0 20:15 21:45 stack tongs and 4 1/2"liner running tools. 5/21/2017 5/22/2017 2.25 COMPZ1 CASING PUTB P M/U shoe and RIH with 4 1/2"12.6# 0.0 0.0 21:45 00:00 L80 TXP liner to 1,456'MD 5/22/2017 5/22/2017 5.00 COMPZ1 CASING PUTB P RIH w/4 1/2"Liner f/1456'to 6180' 1,456.0 6,180.0 00:00 05:00 MD as per tally. 5/22/2017 5/22/2017 2.00 COMPZ1 CASING OTHR P Changed out elevators to 4"and M/U 6,180.0 6,359.0 05:00 07:00 SBE,XO,and hanger assy and XO to 4"DP. 5/22/2017 5/22/2017 0.25 COMPZ1 CASING CIRC P Broke circulation at 3 bpm to ensure 6,359.0 6,359.0 07:00 07:15 string was clear. P/U=115,S/O=100. 5/22/2017 5/22/2017 5.50 COMPZ1 CASING RUNL P RIH on 4"DP f/6,351'to 15,761'MD. 6,359.0 15,761.0 07:15 12:45 5/22/2017 5/22/2017 2.50 COMPZ1 CASING CIRC P Circulated a BU at the shoe w/3 bpm, 15,761.0 15,761.0 12:45 15:15 400 psi. SimOps,M/U and R/B 20 stands of HWDP. 5/22/2017 5/22/2017 0.50 COMPZ1 CASING RURD P Rigged down circulating equipment 15,761.0 15,761.0 15:15 15:45 and took parameters. P/U=210,S/O= 130,ROT=168,TQ=7k. 5/22/2017 5/22/2017 3.50 COMPZ1 CASING RUNL P Continued RIH f/15,761'to 21,154' 15,761.0 21,154.0 15:45 19:15 MD. Page 18/34 Report Printed: 6/12/2017 • :, •perations Summary (with TimeloPepths) r.. , ' CD5-17 ConotoPhitlips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Our.(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(EKE) 5/22/2017 5/22/2017 1.00 COMPZ1 CASING HOSO P Dropped the 1.625"ball and pumped 21,154.0 21,154.0 19:15 20:15 down at 3 bpm. Ball hit at 1100 stk and pressured up to 2600 psi to engage slips. S/O and did not see slips engage. P/U to liner set depth and pressured up to 2700 psi to attempt to set slips again. S/O and did not see slips engage. P/U to set depth and noted 15k reduction in P/U weight. Attempted to pressure up but saw returns to surface. "Liner had released from running tool." 5/22/2017 5/22/2017 1.00 COMPZ1 CASING WAIT T Discussed plan forward with town, 21,154.0 21,154.0 20:15 21:15 Baker,and rig.Decision was made to attempt to re-engage the hanger. 5/22/2017 5/22/2017 0.75 COMPZ1 CASING PACK T Rolled the pumps while S/O to see 21,154.0 21,166.0 21:15 22:00 seals engage liner hanger. Saw pressure increase at 21155'MD. Continued down to 21164'MD and pressured up to 4000 psi to set hanger slips and packer. bleed off and 5/0 to 60k and confirmed hanger had set. 5/22/2017 5/22/2017 0.50 COMPZ1 CASING PRTS P Rigged up and pressure tested casing 21,166.0 21,166.0 22:00 22:30 to 2000 psi for 10 min. Test held. 5/22/2017 5/22/2017 0.75 COMPZ1 WELLPR TRIP P P/U 6'to 240k and 5/0 to tag TOL,set 14,927.0 14,927.0 22:30 23:15 down 5k. Trapped pressure in string and POOH to see pressure drop. TOL @ 14,927'MD 5/22/2017 5/23/2017 0.75 COMPZ1 WELLPR CIRC P POOH to 14,734'MD and circulated 14,927.0 14,734.0 23:15 00:00 BU at 6 bpm, 1260 psi. 5/23/2017 5/23/2017 0.75 COMPZ1 WELLPR CIRC P Continue CBU @ 6 bpm, 1260 psi. 14,734.0 14,734.0 00:00 00:45 Blow down top drive. 5/23/2017 5/23/2017 0.25 COMPZ1 WELLPR OWFF P Flow check well,observe aired up Vis 14,734.0 14,734.0 00:45 01:00 Brine.Well static. 5/23/2017 5/23/2017 0.75 COMPZI WELLPR TRIP P POOH on elevators from 14,734'MD 14,734.0 14,460.0 01:00 01:45 to 14,460'MD racking back 4"DP and HWDP in derrick. 5/23/2017 5/23/2017 1.25 COMPZ1 WELLPR PULD P POOH on elevators from 14,4670'MD 14,460.0 12,798.0 01:45 03:00 to 12,798'MD laying down 4"HWDP to shed. 5/23/2017 5/23/2017 5.00 COMPZ1 WELLPR TRIP P POOH on elevators from 12,798'MD 12,798.0 155.0 03:00 08:00 to 155'MD racking back 4"DP in derrick. 5/23/2017 5/23/2017 0.25 COMPZI WELLPR OWFF P Observe well for flow,static. Function 155.0 155.0 08:00 08:15 rams. 5/23/2017 5/23/2017 0.50 COMPZ1 WELLPR BHAH P POOH from 155'MD,lay down(liner 155.0 0.0 08:15 08:45 running tools. Inspect and verify running tools in order.Calc Fill=99 bbl, Actual fill=124 bbl. 5/23/2017 5/23/2017 1.25 PROD2 EVALWB BHAH P Clean and clear floor.Pick up BOT 0.0 0.0 08:45 10:00 whipstock components to rig floor while waiting on E-line. 5/23/2017 5/23/2017 1.50 PROD2 EVALWB SLPC P PJSM,Cut and slip 98'drilling line, 0.0 0.0 10:00 11:30 calibrate block height while waiting on E-line. Page 19/34 Report Printed: 6/12/2017 .oz it rations Summary (with Timelo�e the �pe9 p CD5-17 CcoocciPhitlips ;4€cxek;a Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 5/23/2017 5/23/2017 0.50 PROD2 EVALWB SVRG P Serrvice top drive and draw works, 0.0 0.0 11:30 12:00 adjust brakes. Monitor well on trip tank,-1 bph loss. 5/23/2017 5/23/2017 3.25 PROD2 EVALWB FLOG P Bring up E-Line tools to rig floor.Rig 0.0 0.0 12:00 15:15 up sheaves and tools. 5/23/2017 5/23/2017 2.25 PROD2 EVALWB FLOG P E-Line USIT from 4,000'MD to 0.0 0.0 15:15 17:30 surface @ low resolution 10°Az,3" VR. 5/23/2017 5/23/2017 4.25 PROD2 EVALWB ELOG P Repeat pass E-Line USIT from 4,000' 0.0 0.0 17:30 21:45 MD to surface @ high resolution 10° Az and 1.5"VR. 5/23/2017 5/23/2017 0.50 PROD2 EVALWB FLOG P Rig down and lay down E-Line tools 0.0 0.0 21:45 22:15 and equipment. 5/23/2017 5/24/2017 1.75 PROD2 WHPST BHAH P PJSM,M/U Baker Whipstock 0.0 62.0 22:15 00:00 assembly,M/U and rack back Mills, HWDP and MWD in derrick.M/U lower whipstock assembly,locator, unloader,magnet,space out pup,3- 1/2"HWDP,magnet,blank sub, anchor to 62'MD 5/24/2017 5/24/2017 1.25 PROD2 WHPST BHAH P Continue M/U Whipstock/Mill BHA per 62.0 224.0 00:00 01:15 Baker rep from 62'MD to 224'MD. 5/24/2017 5/24/2017 1.25 PROD2 WHPST TRIP P RIH with Whipstock/Mill assy from 224.0 1,640.0 01:15 02:30 224'MD to 1,640'MD with 4"DP from derrick. 5/24/2017 5/24/2017 0.25 PROD2 WHPST DHEQ P Shallow pulse test MWD @ 230 gpm, 1,640.0 1,640.0 02:30 02:45 660 psi.(Good, 148°Tool face) 5/24/2017 5/24/2017 9.25 PROD2 WHPST TRIP P Continue RIH with Whipstock/Mill 1,640.0 13,629.0 02:45 12:00 assy from 1,640'MD to 13,629'MD with 4"DP from derrick filling pipe every 20 stands. OA pressure @ 11:30 hrs=200 psi 5/24/2017 5/24/2017 0.75 PROD2 WHPST TRIP P Continue RIH with Whipstock/Mill 13,629.0 14,678.0 12:00 12:45 assy from 13,629'MD to 14,678'MD with 4"DP from derrick. 5/24/2017 5/24/2017 1.00 PROD2 WHPST DLOG P Log RA tag twice @ 220 gpm, 1340 14,678.0 14,750.0 12:45 13:45 psi.Locate @ 14,583'MD.P/U=207k, S/O=143k. 5/24/2017 5/24/2017 0.75 PROD2 WHPST WASH P Wash down @ 220 gpm, 1260 psi, 14,750.0 14,933.0 13:45 14:30 orient whipstock tray to 45L of high side. 5/24/2017 5/24/2017 0.50 PROD2 WHPST WPST P Slack off and enter TOL @ 14,933' 14,933.0 14,844.0 14:30 15:00 MD,P/U=210k,SD/0=145k.Tag no- go @ 14,941'MD.Set achor with 16k down weight.P/U to 215k to confirm anchor set.S/O to 120k,P/U to 220k, S/O and shear off mill from whipstock with 60k down weight.(45k bolt) 5/24/2017 5/24/2017 0.50 PROD2 WHPST PRTS P Pressure test PBR dual packoff seals 14,941.0 14,844.0 15:00 15:30 to 1000 psi for 10 minutes,good. 5/24/2017 5/24/2017 2.25 PROD2 WHPST DISP P Displace well to 9.1 ppg used FloPro 14,844.0 14,844.0 15:30 17:45 milling fluid @ 250-310 gpm, 1240- 2030 psi.40 bbl HiVis spacer followed by FloPro.Obtain SPR's. 5/24/2017 5/24/2017 0.25 PROD2 WHPST OWFF P Flow check well,static.Obtain 14,844.0 14,844.0 17:45 18:00 parameters P/U=205k,S/0=130k, ROT=165k,Tq=6k @ 80 rpm. Page 20/34 Report Printed: 6/12/2017 Operations Summary (with Timelo Depths) 0, gx CD5-17 Co cc hilliips ,,. Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 5/24/2017 5/25/2017 6.00 PROD2 WHPST WPST P Mill window from 14,844'MD to 14,844.0 14,858.0 18:00 00:00 14,858'MD per Baker fishing rep @ 250 gpm, 1840-2070 psi,80-100 rpm, 7-10k Tq, 1-5 WOB.TOW=14,844' MD,BOW=14,858'MD. OA @ 23:00 hrs=350 psi 5/25/2017 5/25/2017 3.00 PROD2 WHPST WPST P Continue milling from 14,858'MD to 14,858.0 14,869.0 00:00 03:00 14,869'MD @ 90 rpm,7.5-9.5k Tq, 250 gpm,2020 psi,4-15k WOB. Upper gauge mill 2'out window, 13'of formation drilled. 5/25/2017 5/25/2017 0.50 PROD2 WHPST WPST P Polish window per Baker rep,pump 30 14,869.0 14,869.0 03:00 03:30 bbl Super Sweep.Work mills through window with no rotaion,then with nu pump no rotaion.Window appears smooth P/U=220k,S/0=140k. 5/25/2017 5/25/2017 1.00 PROD2 WHPST CIRC P Pull up to 14,769'MD,circulate super 14,869.0 14,769.0 03:30 04:30 sweep around @ 300 gpm,2530 psi, 80 rpm 7.5k Tq. 5/25/2017 5/25/2017 2.00 PROD2 WHPST DISP P Displace well to 9.5 ppg Viscosified 14,769.0 14,674.0 04:30 06:30 brine,pump 40 bbl Hi Vis spacer followed by Vis Brine @ 300 gpm, 2530-2310 psi,40 rpm,5.5k Tq.Rack back stand to 14,674'MD.Monitor returns for bbl in/out. 5/25/2017 5/25/2017 0.25 PROD2 WHPST CIRC P Obtain SPR's,blow down top drive. 14,674.0 14,674.0 06:30 06:45 5/25/2017 5/25/2017 0.25 PROD2 WHPST OWFF P Monitor well for flow,aired up but 14,674.0 14,674.0 06:45 07:00 static. 5/25/2017 5/25/2017 1.00 PROD2 WHPST TRIP P POOH on elevators from 14,674'MD 14,674.0 14,195.0 07:00 08:00 to 14,195'MD. Brine airing up,difficult to get proper hole fill. 5/25/2017 5/25/2017 0.25 PROD2 WHPST OWFF P Monitor well for flow,aired up but 14,195.0 14,195.0 08:00 08:15 static.Add de-foamer,Skreenclean and screen down shakers to 120/120 to help reduce airation. 5/25/2017 5/25/2017 3.75 PROD2 WHPST TRIP P POOH on elevators from 14,195'MD 14,195.0 8,008.0 08:15 12:00 to 8,008'MD.Good hole fill. 5/25/2017 5/25/2017 3.25 PROD2 WHPST TRIP P Continue POOH on elevators from 8,008.0 126.0 12:00 15:15 8,008'MD to 126'MD. 5/25/2017 5/25/2017 0.25 PROD2 WHPST OWFF P Monitor well for flow,Static. 126.0 126.0 15:15 15:30 5/25/2017 5/25/2017 1.25 PROD2 WHPST BHAH P Lay down milling assembly as per 126.0 0.0 15:30 16:45 Baker from 126'MD.Clean magnets (fully loaded).Inspect mills,lower mill 1/8"under gauge,center mill 1/16" under gauge,upper mill in gauge, Calc Fill=92.22 bbl,Actual Fill=98.5 bbl. 5/25/2017 5/25/2017 0.50 PROD2 WHPST BHAH P Clean and clear rig floor. 0.0 0.0 16:45 17:15 5/25/2017 5/25/2017 1.50 PROD2 WHDBOP RURD P Make up stack washer with magnet on 0.0 0.0 17:15 18:45 drill pipe,flush stack.Drain stack and cycle rams and annular.Repeat stack flush.Clean magnets,lay down stackwasher.FMC pull wear ring and set test plug. Page 21/34 Report Printed: 6/12/2017 operations Summary (with Timelog Depths) 0 P CD5-17 Yf t►iIitps • �f:akm Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 5/25/2017 5/25/2017 1.00 PROD2 WHDBOP RURD P Rig up to test BOPE,M/U floor valve, 0.0 0.0 18:45 19:45 Dart,4"test joint..Fill stack and lines with H2O and purge system of air. 5/25/2017 5/25/2017 4.00 PROD2 WHDBOP BOPE P Test BOPE with 4"and 4W test joints. 0.0 0.0 19:45 23:45 AOGCC Brian Bixby waived witness. With 4"TJ,test Annular to 250/3500 psi(To save time on 1 test)all rams and valves to 250/3500 psi 5 min each charted.Tested choke valves #1,12,13,14,Upper IBOP/Upper VBR, 4"Demco kill/CV#9,11,lower IBOP, HCR kill/CV#5,8,10/CV#4,6,7/CV #2/HCR Choke/Manual choke and kill/Lower VBR's.Change to 4W TJ, test annular to 250/2500 psi/Upper VBR's,4"XT-39 Dart/Lower VBR's, XT-39 FOSV 250/3500 psi. Tested gas detecters,function flow meter, check PVT alarms. 5/25/2017 5/26/2017 0.25 PROD2 WHDBOP BOPE P Perform accumulator function test. 0.0 0.0 23:45 00:00 System pressure=2975 psi,Manifold pressure=1425 psi,Annular pressure=960 psi.System pressure after functioning all rams and HCR's=1500 psi.200 psi attained @ 31 sec,Full system recovery @ 153 sec.4 bottle N2 average=1900 psi. Operate remote stations. 5/26/2017 5/26/2017 0.50 PROD2 'WHDBOP BOPE P Test blind rams to 250/3500 psi 5 min 0.0 0.0 00:00 00:30 ea,test manual and super auto chokes to 1100 psi-good. 5/26/2017 5/26/2017 0.50 PROD2 WHDBOP RURD P Blow down lines and rig down test 0.0 0.0 00:30 01:00 equipment. FMC set 7.25"ID wear ring. 5/26/2017 5/26/2017 1.00 PROD2 WHPST BHAH P PJSM,M/U 1.5°bend motor and mill 0.0 103.0 01:00 02:00 tooth BHA#6 to 103'per SLB, DD/MWD.Scribe MWD/motor,verify toolface offeset 9.09°. 5/26/2017 5/26/2017 0.50 PROD2 WHPST TRIP P RIH from 103'to 568'with 4"DP and 103.0 568.0 02:00 02:30 HWDP.Change out HWDP joint for Jars on the way in. 5/26/2017 5/26/2017 0.50 PROD2 WHPST TRIP P Continue RIH from 568'MD to 1,511' 568.0 1,511.0 02:30 03:00 MD. 5/26/2017 5/26/2017 0.50 PROD2 WHPST DHEQ P Shallow pulse test MWD 200-250 1,511.0 1,511.0 03:00 03:30 gpm,850-1150 psi,good. 5/26/2017 5/26/2017 5.50 PROD2 WHPST TRIP P Continue RIH with BHA#6 from 1,511' 1,511.0 14,547.0 03:30 09:00 MD to 14,547'MD filling pipe every 20 stands. 5/26/2017 5/26/2017 0.50 PROD2 WHPST DLOG P Wash down and log PIP tag from 14,547.0 14,642.0 09:00 09:30 14,547'MD to 14,642'MD @ 230 gpm, 1810 psi.Locate PIP @ 14,628' bit depth(PIP=14,583') 5/26/2017 5/26/2017 0.25 PROD2 WHPST REAM P Wash and ream from 14,642'MD to 14,642.0 14,738.0 09:30 09:45 14,738'MD 230 gpm, 1780 psi,40 rpm,5.5-6.5k Tq., Page 22/34 Report Printed: 6/12/2017 • ` Operations Summary (with Timelo Pepths) 0 0 CD5-17 CortocoPhitlips ifx:}:s Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (EKE) End Depth(ftKB) 5/26/2017 5/26/2017 2.25 PROD2 WHPST DISP P Displace well from 9.5 ppg Vis Brine to 14,738.0 14,738.0 09:45 12:00 8.8 ppg Flo Pro.Pump 37 bbl HV spacer ahead displace @ 230 gpm, 1780-2020 psi,40 rpm,5-6k Tq. Monitor returns throughout displacement no losses. OA pressure @ 12:00 hrs=300 psi 5/26/2017 5/26/2017 0.25 PROD2 WHPST CIRC P Circulate and condition @ 230 gpm, 14,738.0 14,738.0 12:00 12:15 2020 psi.Orient motor to 42°L of high side.Obtain SPR's with 8.8 ppg FloPro. 5/26/2017 5/26/2017 0.25 PROD2 WHPST OWFF P Shut down and monitor well for flow, 14,738.0 14,738.0 12:15 12:30 static. 5/26/2017 5/26/2017 0.25 PROD2 WHPST WASH P Wash down from 14,738'MD to 14,738.0 14,833.0 12:30 12:45 14,833'MD @ 230 gpm, 1820 psi. Verify tool face @ 42°L. 5/26/2017 5/26/2017 0.25 PROD2 WHPST TRIP P RIH through window from 14,833'MD 14,833.0 14,869.0 12:45 13:00 to 14,869'MD with 6%"Mill tooth bit, no pump or rotary. 5/26/2017 5/26/2017 2.50 PROD2 DRILL DDRL P Directional drill from 14,869'MD to 14,869.0 14,955.0 13:00 15:30 14,955'MD,7,508'TVD.Holding 42°L TF,slide/rotate until 6.5'projected separation at bit.AST=.67,ART=.77, ADT=1.44.Bit hrs=1.44.P/U=220k, S/0=145k,Tq on/off=8k/6k.230 gpm, 1900 psi. 5/26/2017 5/26/2017 0.50 PROD2 DRILL TRIP P Observe well,static.Pull up hole 14,955.0 14,738.0 15:30 16:00 through window from 14,955'to 14,738'MD @ 220k P/U wt. 5/26/2017 5/26/2017 0.50 PROD2 DRILL CIRC P Establish circulation @ 240 gpm, 1650 14,738.0 14,738.0 16:00 16:30 psi,rotate 40 rpm 7k Tq. SIMOPS-PJSM asnd prep for dispalcement. 5/26/2017 5/26/2017 2.25 PROD2 DRILL DISP P Displace well form 8.8 ppg FloPro to 14,738.0 14,738.0 16:30 18:45 9.5 ppg Viscocified brine.Pump 40 bbl HiVis spacer,chase with 570 bbl 9.5 Vis Brine @ 240 gpm, 1650 psi,40 rpm 6k Tq.Take SPR's @ 9.5 ppg. 5/26/2017 5/26/2017 0.25 PROD2 DRILL OWFF P Shut down and flow check static for 14,738.0 14,738.0 18:45 19:00 10 min.blow down top drive. 5/26/2017 5/27/2017 5.00 PROD2 DRILL TRIP P POOH on elevators from 14,738'MD 14,738.0 7,860.0 19:00 00:00 to 7,860'MD.P/U=150k,S/0=125k. Monitor pipe displacement via trip tank,3.1-3.5 bbl per 5 stands. OA pressure @ 22:00 hrs=200 psi 5/27/2017 5/27/2017 2.00 PROD2 DRILL TRIP P Continue POOH on elevators from 7,860.0 3,405.0 00:00 02:00 7,860'MD to 3,405'MD.P/U=105k, S/0=102k. 5/27/2017 5/27/2017 1.50 PROD2 DRILL TRIP P Continue POOH from 3,405'MD to 3,405.0 2,648.0 02:00 03:30 2,648'MD on elevators,inspecting and adjusting supersliders on each joint on the way out per WWT rep. 5/27/2017 5/27/2017 2.75 PROD2 DRILL PULD P Continue POOH slick pipe,culling out 2,648.0 103.0 03:30 06:15 14#DP with worn hard banding from 2,648'MD to 103'MD.Lay down 40 jts on the way out. 5/27/2017 5/27/2017 0.75 PROD2 DRILL BHAH P PJSM,L/D BHA#6 per SLB DD/MWD 103.0 0.0 06:15 07:00 from 103'MD to surface. Calc Fill=96 bbl,Actual Fill=102 bbl. Page 23/34 Report Printed: 6/12/2017 ~' •Operations Summary (with Timelog'Depths) CD5-17 Ct tocoPhillips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (itKB) End Depth(MKB) 5/27/2017 5/27/2017 0.50 PROD2 DRILL BHAH P Clean and clear rig floor.SLB program 0.0 0.0 07:00 07:30 tools for next run in pipe shed. 5/27/2017 5/27/2017 0.75 PROD2 DRILL BHAH P PJSM,M/U Rotary steerable 0.0 125.0 07:30 08:15 production BHA#7 to 125 MD per SLB DD/MWD. 5/27/2017 5/27/2017 1.25 PROD2 DRILL TRIP P RIH from 125'MD to 1723'MD out of 125.0 1,723.0 08:15 09:30 derrick.Lay down 1 HWDP. 5/27/2017 5/27/2017 0.50 PROD2 DRILL DHEQ P Shallow pulse test MWD @ 240 gpm, 1,723.0 1,723.0 09:30 10:00 1130 psi-Good. 5/27/2017 5/27/2017 2.00 PROD2 DRILL PULD P RIH from 1,723'MD to 3,146'MD, 1,723.0 3,146.0 10:00 12:00 inspecting and culling out 14#DP with worn hard banding on the way in. 14 more Jts,54 total. OA pressure @ 12:00 hrs=200 psi 5/27/2017 5/27/2017 10.50 PROD2 DRILL PULD P Continue RIH with BHA#7 from 3,146' 3,146.0 10,225.0 12:00 22:30 MD to 10,225'MD,inspecting,culling out and replacing 49 more joints 14# DP.(103 jts total) 5/27/2017 5/28/2017 1.50 PROD2 DRILL TRIP P Continue RIH from 10,225'MDF to 10,225.0 11,648.0 22:30 00:00 11,648'MD,removing Super Sliders from stands#121-129.P/U=175k, S/0=125k. OA pressure @ 23:00 hrs=200 psi 5/28/2017 5/28/2017 2.50 PROD2 DRILL TRIP P RIH from 11,648'MD to 14,108'MD. 11,648.0 14,108.0 00:00 02:30 Remove 27 supersliders and change out 45 top clamps on the way in. 5/28/2017 5/28/2017 0.50 PROD2 DRILL TRIP P Continue RIH from 14,108'MD to 14,108.0 14,581.0 02:30 03:00 14,581'MD on elevators. 5/28/2017 5/28/2017 1.00 PROD2 DRILL DLOG P Wash down @ 210 gpm, 1400 psi 14,581.0 14,676.0 03:00 04:00 from 14,581'MD to 14,676'MD logging for PIP tag,locate PIP(-400 gAPI)@ 14,583'MD(14,645'bit depth). 5/28/2017 5/28/2017 0.25 PROD2 DRILL REAM P Continue wash/ream down to 14,770' 14,676.0 14,770.0 04:00 04:15 MD @ 265 gpm, 1810 psi,60 rpm,4.5 -6.5k Tq.Downlink to Powerdrive. 5/28/2017 5/28/2017 2.25 PROD2 DRILL SVRG P PJSM,Change out XT39 saver sub on 14,770.0 14,770.0 04:15 06:30 top drive for drilling C lateral. 5/28/2017 5/28/2017 1.00 PROD2 DRILL SLPC P Cut/Slip 75'drilling line.Calibrate 14,770.0 14,770.0 06:30 07:30 block height.Monitor gain/loss on TT=0 G/L 5/28/2017 5/28/2017 0.50 PROD2 DRILL SVRG P Service top drive and draw works, 14,770.0 14,770.0 07:30 08:00 adjust brakes.Monitor gain/loss on TT=0 G/L 5/28/2017 5/28/2017 0.50 PROD2 DRILL MPDA P P/U to 14,739',pull trip nipple and 14,770.0 14,739.0 08:00 08:30 install MPD bearing/element. 5/28/2017 5/28/2017 0.25 PROD2 DRILL TRIP P RIH from 14,739'to 14,865'MD 14,739.0 14,865.0 08:30 08:45 5/28/2017 5/28/2017 0.50 PROD2 DRILL REAM P Wash/ream to bottom 14,955'MD 14,865.0 14,955.0 08:45 09:15 265 gpm, 1810-1760 psi,80 rpm 6k Tq. 5/28/2017 5/28/2017 1.50 PROD2 DRILL DDRL P Directional drill from 14,955'MD to 14,955.0 15,055.0 09:15 10:45 15,055'MD,7,506'TVD.ADT=1.1. Begin displacement on the fly to 8.8 ppg FloPro,40 bbl spacer ahead. 5/28/2017 5/28/2017 0.75 PROD2 DRILL DISP P Circulate and complete FloPro 15,055.0 15,055.0 10:45 11:30 displacement@ 230 gpm 1770 psi,80 rpm,6k Tq.Obtain SPR's with 8.8 PPg, Page 24/34 Report Printed: 6/12/2017 • Driiifingt Operations Summary (with TimelolDepths) &thesis ,. CD5-17 ConocoPhitltps 0, Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKS) 5/28/2017 5/28/2017 0.50 PROD2 DRILL DDRL P Directional drill from 15,055'MD to 15,055.0 15,109.0 11:30 12:00 15,109'MD,7,503'TVD.Tour ADT=1.64,P/U=195k,S/0=140k, ROT=155k, 100 rpm,Tq on/off=8.5k/5.5k,275 gpm,2100 psi, ECD=9.5 ppg EMW. 5/28/2017 5/29/2017 12.00 PROD2 DRILL DDRL P Directional drill from 15,109'MD to 15,109.0 15,910.0 12:00 00:00 15,910'MD,7,496'TVD.ADT=9.8, P/U=200k,S/0=120k,ROT=160k, 160 rpm,Tq on/off=11k/9k,275 gpm,2250 psi,ECD=9.89 ppg EMW. Bit=11.44 hrs,Jars=88.77 hrs. Adding 2 ppb Nut Plug F per circulation in active system,total concentration @ 00:00 hrs= 12 ppb. Shakers in recovery mode,API 45/60 screens middle deck,API 170 lower deck. OA pressure @ 22:00 hrs=200 psi 5/29/2017 5/29/2017 12.00 PROD2 DRILL DDRL P Directional drill from 15,910'MD to 15,910.0 17,626.0 00:00 12:00 17,626'MD,7,504'TVD.ADT=9.54, P/U=210k,S/0=115k,ROT=150k, 140 rpm,Tq on/off=14k/10k,270 gpm, 2700 psi, ECD=10.85 ppg EMW. Jars=98.31 hrs. Adding 2 ppb Nut Plug F per circulation in active system,total concentration @ 12:00 hrs=25 ppb. Shakers in recovery mode,API 45/60 screens middle deck,API 170 lower deck. Max gas units=-700,Average—500 units. OA pressure @ 12:00 hrs=300 psi 5/29/2017 5/30/2017 12.00 PROD2 DRILL DDRL P Directional drill from 17,626'MD to 17,626.0 19,530.0 12:00 00:00 19,530'MD,7,510'TVD.ADT=8.20, P/U=220k,S/0=105k, ROT=150k, 140 rpm,Tq on/off=16.5/11 k,270 gpm, 3000 psi, ECD=11.22 ppg EMW. Bit=28.18 hrs,Jars=98.31 hrs. Maintaining 25 ppb Nut Plug F in active system.Shakers in recovery mode,API 45/60 screens middle deck, API 200 lower deck. Max gas units=-3000 drilled gas from —18,500'-19,000',Average—500 units. OA pressure @ 22:00 hrs=250 psi Page 25/34 Report Printed: 6/12/2017 3:¢ perations Summary (with TimeloPepths) ifiV,.14 CD5-17 ConocoPhitlips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB). 5/30/2017 5/30/2017 12.00 PROD2 DRILL DDRL P Directional drill from 19,530'MD to 19,530.0 20,578.0 00:00 12:00 20,578'MD,7,554'TVD.ADT=9.41, P/U=232k,S/O=95k,ROT=140k, 140 rpm,Tq on/off=14.7/12k,270 gpm, 3250 psi,ECD=11.60 ppg EMW. Bit=37.59 hrs,Jars=115.92 hrs. Maintaining 25 ppb Nut Plug F in active system.Shakers in recovery mode,API 45/60 screens middle deck, API 200 lower deck. Max gas units=-500 units. Exited Alpine C base @ 19,715'to cross fault,re-entered @ 20,900'MD. OA pressure @ 11:15 hrs=350 psi -Pumping HiVis/LoVis 20/20 bbl anti- jamming sweeps two per tour. -Made 1320 bbl injection run at GIS into CD5-03,due to latent LCM in mud. 5/30/2017 5/31/2017 12.00 PROD2 DRILL DDRL P Directional drill from 20,578'MD to 20,578.0 21,909.0 12:00 00:00 21,909'MD,7,571'TVD.ADT=8.24, P/U=245k,S/O=N/A,ROT=140k, 140 rpm,Tq on/off=16/13k,270 gpm,3280 psi,ECD=11.28 ppg EMW. Bit=46.83 hrs,Jars=124.16 hrs. Maintaining 25 ppb Nut Plug F in active system.Shakers in recovery mode,API 45/60 screens middle deck, API 200 lower deck. Average gas units-500. OA pressure @ 22:00 hrs=300 psi -Performed 430 bbl whole mud dilution @ 20,700'MD for AIS,DS and mud weight. -GIS kicked out 8 yds Nut Plug today to clean cell.Cumulative well=25 yds. Lost Slack off weight @ 20,672'MD. 5/31/2017 5/31/2017 9.50 PROD2 DRILL DDRL P Directional drill from 21,909'MD to 21,909.0 22,957.0 00:00 09:30 22,957'MD,7,558'TVD.ADT=7.15, P/U=245k,S/O=N/A,ROT=175-140k, 140 rpm,Tq on/off=14/12.5k,270 gpm,3280 psi,ECD=11.28 ppg EMW. Bit=46.83 hrs,Jars=124.16 hrs. Maintaining 25 ppb Nut Plug F in active system.Shakers in recovery mode,API 45/60 screens middle deck, API 200 lower deck. Called TD @ 22,957'MD due -+100gAPI Alpine B instability, observe ECD climbing and attempting to pack off. Start making dynamic connections holding 500 psi on annulus to reduce cycling from 22,200'MD 5/31/2017 5/31/2017 2.50 PROD2 CASING CIRC P Circulate and condition @ 270 gpm, 22,957.0 22,957.0 09:30 12:00 3680-3400 psi, 120-100 rpm, 14.5k- 12.5k Tq.Strip out LCM from mud system. ECD from 11.93 ppg to 11.27 ppg EMW. OA pressure @ 11:00 hrs=200 psi Page 26/34 Report Printed: 6/12/2017 "O. Operations Summary (with Timelog�epths) ..0a CD5-17 "- _inp Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase - Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 5/31/2017 5/31/2017 2.00 PROD2 CASING CIRC P Continue C&C stripping out LCM @ 22,957.0 22,957.0 12:00 14:00 270 gpm,3400 psi, 100 rpm, 12k Tq. Reciprocate from 22,957'MD to 22,8965'MD. Total Nut Plug kicked out @ GIS today=25 yd,Cumulative=50 yd 5/31/2017 6/1/2017 10.00 PROD2 CASING BKRM T Backream out of hole from 22,957'MD 22,957.0 22,396.0 14:00 00:00 to 22,396'MD @ 270 gpm,3300 psi 60 rpm, 10-14k Tq,ECD=11.2-11.4 ppg EMW.ROT=153k.Making dynamic connections holding 500 psi on annulus to reduce cycling.Very slow backreaming 10-30 fph due shale instability,ECD climbing and brief packoffs. OA pressure @ 22:00 hrs=200 psi 6/1/2017 6/1/2017 5.75 PROD2 CASING BKRM T Backream out of hole from 22,396'MD 22,396.0 22,275.0 00:00 05:45 to 22,275'MD @ 270 gpm,3300-3450 psi 60 rpm, 10-14k Tq, ECD=11.2- 11.4 ppg EMW.ROT=153k. Making dynamic connections holding 500 psi on annulus to reduce cycling.Very slow backreaming 10-30 fph due shale instability, ECD erratic and minor packoffs. Losses—15 bph 6/1/2017 6/1/2017 2.25 PROD2 CASING BKRM T Continue BROOH,increase rotary 22,275.0 22,013.0 05:45 08:00 speed to 120 rpm 10.5-15.5k Tq while in between shale intervals,attempting to P/U dunes and clean lateral. Observe packoff @ 22,013'MD 6/1/2017 6/1/2017 4.00 PROD2 CASING BKRM T Continue backream out of hole from 22,013.0 21,909.0 08:00 12:00 22,013'MD to 21,909'MD @ 270 gpm,3360-3450 psi 60 rpm, 10-14k Tq,ECD=11.2-11.4 ppg EMW. ROT=165k.Making dynamic connections holding 500 psi on annulus to reduce cycling. OA pressure @ 12:00 hrs=400 psi 6/1/2017 6/1/2017 10.50 PROD2 CASING BKRM T Continue backream out of hole from 21,909.0 21,529.0 12:00 22:30 21,909'MD to 21,529'MD @ 270 gpm,3150-3300 psi 60 rpm, 10-14k Tq,ECD=11.2-11.4 ppg EMW. ROT=165k.Making dynamic connections holding 500 psi on annulus to reduce cycling. Out of ratty section @ 21,715'MD, increase rotary to 140 rpm 13k Tq for hole cleaning. OA pressure @ 12:00 hrs=400 psi 6/1/2017 6/2/2017 1.50 PROD2 CASING CIRC P Circulate and condition,CBU @ 270 21,529.0 21,529.0 22:30 00:00 gpm,3300 psi, 140 rpm, 13k Tq, ECD=11.44 ppg EMW,Reciprocate from 21,529'-21,433'MD. OA pressure @ 22:00 hrs=480 psi 234 bbl mud lost past 24 hrs,628 bbl lost cumulative interval. Page 27/34 Report Printed: 6/12/2017 !perations Summary (with Timeloggepths) CD5-17 Conoccehiiiips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time ` End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/2/2017 6/2/2017 0.50 PROD2 CASING OWFF P Perform MPD drawdown,shut in with 21,529.0 21,529.0 00:00 00:30 500 psi,slowly reduce pressure 50 psi at a time until chokes open for 2 min. Shut in and monitor for 7 minutes 0 psi.Open chokes and monitor for flow, no flow. 6/2/2017 6/2/2017 1.75 PROD2 CASING CIRC P Obtain SPR's with 9.3 ppg.CBU @ 21,529.0 21,529.0 00:30 02:15 270 gpm,3350 psi,140 rpm, 15k Tq. P/U=240k,S/O=N/A,ROT=165k. Shale returns at shaker diminished. S/D and drop 2.11"hollow drift with 110' tail @ stand#224 in hole. 6/2/2017 6/2/2017 0.50 PROD2 CASING PMPO P Attempt to pump out of hole from 21,529.0 21,400.0 02:15 02:45 21,529'MD to 21,400'MD @ 270 gpm,3010-3250 psi,pull 35k over. 6/2/2017 6/2/2017 7.00 PROD2 CASING BKRM P Backream out of hole from 21,400'MD 21,400.0 19,625.0 02:45 09:45 to 19,625'MD@ 270 gpm,3010-3270 psi, 140 rpm, 16-15k,Take MWD survey @ 20,575'MD.Maiking dynamicc connections holding 500- 400 psi on annulus. Rig off high line @ 07:55,back on @ 10:30. 6/2/2017 6/2/2017 2.25 PROD2 CASING CIRC P Circulate 1.75 bottoms up @ 270 gpm, 19,625.0 19,625.0 09:45 12:00 2930 psi, 140 rpm,13.8k Tq, 10.78 ppg ECD. 6/2/2017 6/2/2017 1.00 PROD2 CASING CIRC P Continue C&C until shakers cleaned 19,625.0 19,625.0 12:00 13:00 up(2.5 BU total)@ 270 gpm,2900 psi, 140 rpm, 13k Tq, 10.75 ECD. Reciprocate 19,625'to 19,530'MD. 6/2/2017 6/3/2017 11.00 PROD2 CASING PMPO P Pump out of hole from 19,625'MD to 19,625.0 15,395.0 13:00 00:00 15,395'MD @ 270 gpm,2250 psi, 10.2 ppg ECD.Continue dynamic connections holding 400 psi on annulus.P/U=200k,S/0=125k. Daily losses to formation=297 bbl, Cumulative interval=925 bbl. OA pressure @ 22:00 hrs=200 psi 6/3/2017 6/3/2017 1.50 PROD2 CASING PMPO P Pump out of hole from 15,395'MD to 15,395.0 14,964.0 00:00 01:30 14,964'MD @ 270 gpm,2300 psi, 10.13 ppg ECD.Continue dynamic connections holding 400 psi on annulus.Re-shoot MWD survey @ 15,244'MD.Pulling BHA into window from 15,165'to 14,964'.P/U=201k, S/0=123k. 6/3/2017 6/3/2017 0.50 PROD2 CASING SMPD P Reduce back pressure to 50 psi(due 14,964.0 14,844.0 01:30 02:00 sliders)and strip BHA into window from 14,964'MD to 14,844'.Observe no overpull through window. 6/3/2017 6/3/2017 0.25 PROD2 CASING SMPD P Continue stripping with 50 psi AP from 14,844.0 14,568.0 02:00 02:15 14,844'MD to 14,568'. 6/3/2017 6/3/2017 2.00 PROD2 CASING DISP P PJSM,displace well to 9.5 ppg Vis 14,568.0 14,568.0 02:15 04:15 Brine @ 270 gpm,pump 36 bbl HV spacer followed by 601 bbl Vis brine. ICP=2350,FCP=2090.No rotary or reciprocation. 6/3/2017 6/3/2017 0.25 PROD2 CASING OWFF P Flow check well,static. 14,568.0 14,568.0 04:15 04:30 SIMOPS-PJSM on remove RCD, install trip nipple. Page 28/34 Report Printed: 6/12/2017 ' Operations Summary (with Timelog!epths) 00._ ... ,, CD5-17 ConocoM aps h�xek.n Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-x Operation MKS) End,Depth(ftKB) 6/3/2017 6/3/2017 0.75 PROD2 CASING MPDA P Flush MPD system with 20 bbl water. 14,568.0 14,568.0 04:30 05:15 Blow down system.Pull RCD element, install trip nipple. OWFF still static,slight drop. Obtain SPR's with 9.5 ppg,blow down top drive,prep to POOH. 6/3/2017 6/3/2017 6.75 PROD2 CASING TRIP P POOH on elevators from 14,568'MD 14,568.0 2,985.0 05:15 12:00 to 2,985'MD.P/U=104k,S/0=100k. Calc fill plus—1.5 bph static loss. 6/3/2017 6/3/2017 1.75 PROD2 CASING TRIP P POOH on elevators from 2,985'MD to 2,985.0 398.0 12:00 13:45 398'MD. 6/3/2017 6/3/2017 0.25 PROD2 CASING OWFF P Monitor well,static slight drop. 398.0 398.0 13:45 14:00 6/3/2017 6/3/2017 1.00 PROD2 CASING BHAH P L/D BHA#7.Observe significant 398.0 0.0 14:00 15:00 restrictor erosion,remaining carrier wedged in bottom of bit with J slots missing.eccentric wear on stabilizers, Powerdrive 2 extruded seals,bit showed erosion. 6/3/2017 6/3/2017 0.75 PROD2 CASING BHAH P Clean and clear rig floor,L/D excess 0.0 0.0 15:00 15:45 tools and equipment. 6/3/2017 6/3/2017 0.75 COMPZ2 CASING RURD P Mobilize casing running equipment to 0.0 0.0 15:45 16:30 rig floor and R/U. 6/3/2017 6/3/2017 3.50 COMPZ2 CASING PUTB P P/U and run 4W TXP-M liner/Perf 0.0 3,163.0 16:30 20:00 pups per running order to 3,163'MD P/U=85k,S/O=85k. 6/3/2017 6/3/2017 1.00 COMPZ2 CASING RUNL P Make up liner running tools,bumper 3,163.0 3,203.0 20:00 21:00 sub and XO to 3,203'MD. 6/3/2017 6/3/2017 0.50 COMPZ2 CASING CIRC P M/U stand DP to 3,294'MD,establish 3,203.0 3,294.0 21:00 21:30 circulation through liner @ 2 bpm,70 psiu for 15 bbl.Blow down top drive. P/U=90k,S/0=90k. 6/3/2017 6/4/2017 2.50 COMPZ2 CASING RUNL P Run liner on 4"14#DP from 3,294' 3,294.0 7,082.0 21:30 00:00 MD to 7,082'MD. Daily formation losses=78 bbl Cumulative interval=1003 bbl OA pressure @ 22:00 hrs=0 psi. 6/4/2017 6/4/2017 3.75 COMPZ2 CASING RUNL P Run liner on 4"DP from 7,082'MD to 7,082.0 14,730.0 00:00 03:45 14,730'MD.S/0=130k. 6/4/2017 6/4/2017 2.25 COMPZ2 CASING PULD P Pick up and rack back 20 stands 4" 14,730.0 14,730.0 03:45 06:00 HWDP in derrick. Monitor well on trip tank,3 bbl lost to formation in 2.25 hrs. 6/4/2017 6/4/2017 0.50 COMPZ2 CASING CIRC P Break circulation @ 2 bpm, 15 total 14,730.0 14,730.0 06:00 06:30 bbl pumped.Obtain parameters before window exit.P/U=195k, S/0=130k,ROT=155k.Torque @ 10 rpm=5.4k,20 rpm=4.9k. Blow down top drive,line up on trip tank. 6/4/2017 6/4/2017 5.50 COMPZ2 CASING RUNL P Continue RIH with 4W TXP-M liner on 14,730.0 18,590.0 06:30 12:00 4"DP from 14,728'MD to 18,590'MD. P/U=210k,S/0=120-k©17,434'MD. Observe 10-15k reduction in S/O @ 17,434'-18,025'MD. OA pressure©12:00 hrs=0 psi Page 29/34 Report Printed: 6/12/2017 kOperations Summary (with Timelog!epths) CD5-17 CeelocoPhiilips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time.. End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/4/2017 6/4/2017 7.50 COMPZ2 CASING RUNL P Continue RIH with 4Y2'TXP-M liner on 18,590.0 22,528.0 12:00 19:30 4"DP from 18,590'MD to 22,528'MD. Observe loss of S/0 weight @ 21,605'.P/U 250k,20k break over. Work liner down through shale to 21,975',liner ran good with-120k S/O weight to 22,275'back into shale section.Continue working liner down to 22,528'MD.Repeated attempts unsuccessful to pass apparent ledge @ 22,528'.P/U=270k,S/0=0. 6/4/2017 6/4/2017 1.50 COMPZ2 CASING RUNL P Establish 20 rpm rotation @ 10.5k free 22,528.0 22,687.0 19:30 21:00 torque,continue in hgole @ 20 rpm from 22,528'MD to 22,6787'MD picking up single to place liner on depth.No issues running in with 20 rpm, 155k ROT weight, 1-4k WOB. Shut down and work out torque. 6/4/2017 6/4/2017 2.00 COMPZ2 CASING HOSO P Pull string in tension to set depth 22,687.0 22,671.0 21:00 23:00 22,675', P/U=250k.Break circulation @ 2 bpm,470 psi circulate 20 bbl after pipe filled.Shut down and drop 29/32" setting ball. Pump down @ 3 bpm, 710 psi for 115 bbl,slow to 1.5 bpm then 1 bpm @ 150 bbl.Ball on seat @ 185 bbl. 6/4/2017 6/4/2017 0.50 COMPZ2 CASING HOSO P Release liner per Baker rep,pressure 22,671.0 19,540.0 23:00 23:30 up to 3200 psi,slack off to 138k.P/U and observe free travel @ 230k(Liner Released)Pressure up to 4250 psi and shear out ball seat.Liner shoe=22,675'MD, TOL=19,492.57' MD.(Running tool BHA=48') 6/4/2017 6/5/2017 0.50 COMPZ2 CASING TRIP P Pull running tools clear of liner top,lay 19,540.0 19,404.0 23:30 00:00 down single.Rack back 1 stand DP. P/U=230k. 44 bbl lost to formation today. OA pressure @ 22:00 hrs=0 psi. 6/5/2017 6/5/2017 3.75 COMPZ2 CASING TRIP P POOH with HRDE liner running tool 19,404.0 14,695.0 00:00 03:45 from 19,404'MD to 14,695'MD.P/U 232k to 203k @ 14,696'.Pull slowly through window,observe no overpull at all. 6/5/2017 6/5/2017 1.00 COMPZ2 CASING CIRC P Circulate bottoms up 490 bbl,stage up 14,695.0 14,695.0 03:45 04:45 from 1 bpm to 8 bpm, ICP-170 psi, FCP=1420 psi.Mud weight in/out 9.5+ PPg. 6/5/2017 6/5/2017 0.50 COMPZ2 CASING OWFF P Flow check well static. 14,695.0 14,695.0 04:45 05:15 6/5/2017 6/5/2017 1.50 COMPZ2 CASING TRIP P Continue POOH from 14,695'MD to 14,695.0 11,858.0 05:15 06:45 11,858'MD on trip tank.P/U=195k- 175k. 6/5/2017 6/5/2017 5.25 COMPZ2 CASING PULD P Continue POOH with liner running 11,858.0 6,104.0 06:45 12:00 tools,layng down slick 4"14#drill pipe to pipe shed from 11,858'MD to 6,104'MD. 6/5/2017 6/5/2017 5.00 COMPZ2 CASING PULD P Continue POOH with liner running 6,104.0 44.0 12:00 17:00 tools,layng down slick 4"14#drill pipe to pipe shed from 6,104'MD to 44' MD. Page 30/34 Report Printed: 6/12/2017 x 3* •Operations Summary (with Timelofepths) CD5-17 ConocoPhiilips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth dtKB) 6/5/2017 6/5/2017 0 75 COMPZ2 CASING BHAH P L/D liner running tools,clean and clear 44.0 0.0 17:00 17:45 rig floor. 6/5/2017 6/5/2017 1.25 COMPZ2 CASING RURD P Mobilize liner tools and equipment, 0.0 0.0 17:45 19:00 perf pups to rig floor.R/U casing equipment.PJSM. 6/5/2017 6/5/2017 0.50 COMPZ2 CASING PUTB P P/U and RIH with 16 jts 4W TXP-M 0.0 674.0 19:00 19:30 liner and 4 perf pups to 674'MD. 6/5/2017 6/5/2017 0.50 COMPZ2 CASING PUTB P M/U Baker liner setting sleeve,ball 674.0 716.0 19:30 20:00 seat sub and HRDE running tool to 716'MD 6/5/2017 6/5/2017 0.50 COMPZ2 CASING CIRC P XO to XT-39 drill pipe,run 1 stand to 716.0 811.0 20:00 20:30 811'MD.Break circulation @ 1 bpm 50 psi,2 bpm 60 psi to ensure flow path. 6/5/2017 6/6/2017 3.50 COMPZ2 CASING RUNL P Run liner on drill pipe from 811'MD to 811.0 7,365.0 20:30 00:00 7,365'MD.S/0=120k. Daily losses to formation 37 bbl OA pressure @ 22:00 hrs=0 psi. 6/6/2017 6/6/2017 5.25 COMPZ2 CASING RUNL P Run liner on drill pipe from 7,365'MD 7,365.0 14,661.0 00:00 05:15 to window at 14,661'MD and take parameters.S/0=150k P/U=226k, ROT= 150,20 rpm,7k TQ. 6/6/2017 6/6/2017 1.50 COMPZ2 CASING RUNL P Continue to run liner on DP f/14,661' 14,661.0 15,600.0 05:15 06:45 to 15,600'MD. P/U=235k,Calc Disp= 101.14 bbl,Actual=94.5 bbl. 6/6/2017 6/6/2017 1.75 COMPZ2 CASING HOSO P Dropped 29/32"ball and pumped 15,600.0 14,906.0 06:45 08:30 down 3 bpm for 90 bbl and reduced to 1.5 bpm to seat ball at 125 bbl pumped. Pressured up to 3140 psi and SIO to 150k. P/U to 235k and confirmed free w/free travel. Pressured up to 3800 psi and sheared ball seat. "TOL=14,906',Shoe= 15,600'MD" 6/6/2017 6/6/2017 1.50 COMPZ2 WELLPR CIRC P Pull running tool through window to 14,906.0 14,728.0 08:30 10:00 14,728'MD and CBU w/8 bpm,2010 psi. 499 bbl pumped. 6/6/2017 6/6/2017 0.25 COMPZ2 WELLPR OWFF P OWFF,well static. 14,728.0 14,728.0 10:00 10:15 6/6/2017 6/6/2017 1.00 COMPZ2 WELLPR SLPC P Slip and cut 98'of DL. 14,728.0 14,728.0 10:15 11:15 6/6/2017 6/6/2017 0.75 COMPZ2 WELLPR SVRG P B/D TD and lubricated rig. 14,728.0 14,728.0 11:15 12:00 6/6/2017 6/6/2017 0.50 COMPZ2 WELLPR RURD P Rig up to L/D DP. SimOps calibrated 14,728.0 14,728.0 12:00 12:30 block high. 6/6/2017 6/6/2017 2.00 COMPZ2 WELLPR PULD P POOH and L/D 20 stands of HWDP f/ 14,728.0 12,311.0 12:30 14:30 14,730'to 12,311'MD. 6/6/2017 6/6/2017 5.00 COMPZ2 WELLPR TRIP P POOH and rack back f/12,311'to 137' 12,311.0 137.0 14:30 19:30 MD. 6/6/2017 6/6/2017 0.50 COMPZ2 WELLPR BHAH P L/D liner running tool as per Baker. 137.0 0.0 19:30 20:00 6/6/2017 6/6/2017 1.00 COMPZ2 WHDBOP RURD P Pulled wear ring and set test plug. 0.0' 0.0 20:00 21:00 R/U to test BOPE. Page 31/34 Report Printed: 6/12/2017 operations Summary (with Timelogepths) 014 CD5-17 ConocoPhillips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKE) End Depth(ftKB) 6/6/2017 6/7/2017 3.00 COMPZ2 WHDBOP BOPE P Tested BOPE w/4"test joint. Annular, 0.0 0.0 21:00 00:00 Valves 1, 12, 13, 14,Kill Demco,Auto IBOP,Top VBRs,HCR Kill,#9, 11, Manual IBOP,8, 10,needle valve,XT- 39 Dart,4,6,7,FOSV,2,HCR Choke,manual choke,manual kill, and lower VBRs to 250/3500 psi. Test witness waived by AOGCC Matt Herrera. 6/7/2017 6/7/2017 2.50 COMPZ2 WHDBOP BOPE P Continued to test BOPE w/4.5"test 0.0 0.0 00:00 02:30 joint. Annular,upper and lower VREs, Blinds,and valve#3 to 250/3500 psi. Tested supper and manual chokes to 1100 psi and gas alarms. Performed accumulator test,200 psi in 25 sec, full psi at 147 sec. Test witness waived by AOGCC Matt Herrera. 6/7/2017 6/7/2017 0.50 COMPZ2 WHDBOP 'RURD P B/D lines and rig down BOP test 0.0 0.0 02:30 03:00 equipment. Installed 9"wear ring. 6/7/2017 6/7/2017 0.50 COMPZ2 FISH RURD P Clear floor and P/U BHA parts. 0.0 0.0 03:00 03:30 6/7/2017 6/7/2017 0.75 COMPZ2 FISH BHAH P M/U whipstock retrieval BHA as per 0.0 91.0 03:30 04:15 Baker. Scribe MWD to the flow port on hook. 6/7/2017 6/7/2017 0.50 COMPZ2 FISH TRIP P RIH f/91'to 1,508'MD, S/O=90k. 91.0 1,508.0 04:15 04:45 6/7/2017 6/7/2017 0.50 COMPZ2 FISH DHEQ P Shallow test MWD,good. 300 gpm, 1,508.0 1,508.0 04:45 05:15 640 psi. 6/7/2017 6/7/2017 0.75 COMPZ2 FISH TRIP P RIH f/1,508'to 1,890'MD while filling 1,508.0 1,890.0 05:15 06:00 pipe every 20 stands. 6/7/2017 6/7/2017 0.50 COMPZ2 FISH SVRG P Serviced top drive. 1,890.0 1,890.0 06:00 06:30 6/7/2017 6/7/2017 7.00 COMPZ2 FISH TRIP P RIH f/1,890'to 14,546'MD. 1,890.0 14,546.0 06:30 13:30 6/7/2017 6/7/2017 1.50 COMPZ2 FISH DLOG P Logged for RA tag down to 14,641' 14,546.0 14,642.0 13:30 15:00 MD while orienting hook jet. RA tag seen at 14,592'MD 6/7/2017 6/7/2017 1.00 COMPZ2 FISH WASH P Washed down f/14,641'to 14,860' 14,642.0 14,860.0 15:00 16:00 MD w/210 gpm, 1000 psi. Cleaned out whipstock slot w/300 gpm, 1750 psi. P/U=215,S/O=140. 6/7/2017 6/7/2017 1.00 COMPZ2 FISH FISH P Orient hook to slot and wash down. 14,860.0 14,845.0 16:00 17:00 Locate slot @ 14,845'MD and set down 10k. P/U and engage hook. Pull 20k over and fired jars at 250k. continued to pull to 295k and free whipstock assy. P/U=218. OWFF, slight drop. 6/7/2017 6/7/2017 2.00 COMPZ2 FISH CIRC P Pull up to 14,770'MD and circulate BU 14,845.0 14,770.0 17:00 19:00 at 6 bpm, 1330 psi. B/D TD. 6/7/2017 6/8/2017 5.00 COMPZ2 FISH TRIP P POOH f/14,770'to 10,007'MD,P/U= 14,770.0 10,007.0 19:00 00:00 175. 6/8/2017 6/8/2017 7.00 COMPZ2 FISH TRIP P POOH f/10,007'to 220'MD,P/U=175 10,007.0 220.0 00:00 07:00 -62. Calculated fill 100.1 bbl. Actual= 145 bbl. 6/8/2017 6/8/2017 0.50 COMPZ2 FISH OWFF P OWFF,slight drop. Held PJSM for 220.0 220.0 07:00 07:30 UD BHA and whipstock. 6/8/2017 6/8/2017 1.25 COMPZ2 FISH BHAH P UD BHA and whipstock as per Baker 220.0 0.0 07:30 08:45 and Slb. Page 32/34 Report Printed: 6/12/2017 1,0 , Operations Summary (with Timelog Depths) CD5-17 rill Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(EKE) 6/8/2017 6/8/2017 1.50 COMPZ2 WELLPR RURD P Clean and cleared rig floor. R/D 0.0 0.0 08:45 10:15 whipstock tools and R/U tubing running equipment,swapped elevators,and P/U tongs. 6/8/2017 6/8/2017 0.50 COMPZ2 WELLPR SVRG P Serviced rig equipment. 0.0 0.0 10:15 10:45 6/8/2017 6/9/2017 13.25 COMPZ2 WELLPR PUTB P RIH with 4 1/2"12.6#Hyd563 upper 0.0 13,666.0 10:45 00:00 completion string as per tally to 13,666'MD. S/0=115. 6/9/2017 6/9/2017 1.50 COMPZ2 RPCOMP PUTB P RIH with 4 1/2"12.6#Hyd563 f/ 13,666.0 14,931.0 00:00 01:30 13,666' to 14,931'MD. S/0=115 6/9/2017 6/9/2017 1.50 COMPZ2 RPCOMP HOSO P Broke circulation and S/O with 1 bpm, 14,931.0 14,976.0 01:30 03:00 90 psi. Observed seals enter SBE w/ 270 psi and shut off pumps. Worked pipe down w/15k,pushing debris and no goed out at 14,976'MD. P/U=170, S/O=115. 6/9/2017 6/9/2017 1.25 COMPZ2 RPCOMP HOSO P Pulled 3 joints for space out and the 14,976.0 14,942.0 03:00 04:15 wear ring. M/U space out pups,tubing hanger and landing joint. 6/9/2017 6/9/2017 1.50 COMPZ2 RPCOMP CIRC P Spotted 32 bbl of CI brine in the 14,942.0 14,942.0 04:15 05:45 annulus at 5 bpm,440 psi. 6/9/2017 6/9/2017 1.00 COMPZ2 RPCOMP THGR T Key slot in the tubing hanger was 180 14,942.0 14,942.0 05:45 06:45 deg.off of where it should be. Situation was assessed and the hanger was reoriented. 6/9/2017 6/9/2017 1.50 COMPZ2 RPCOMP THGR P Landed 4 1/2"tubing hanger while 14,942.0 14,974.0 06:45 08:15 washing down w/.5 bpm,60 psi. Verified seals engaged SBE w/220 psi build. Confirmed hanger aligned through production port. 6/9/2017 6/9/2017 0.75 COMPZ2 RPCOMP PRTS P Attempted to pressure test hanger 14,974.0 14,974.0 08:15 09:00 seals. Upper seals failed. 6/9/2017 6/9/2017 2.25 COMPZ2 RPCOMP THGR T R/D test equipment pull hanger to floor 14,974.0 14,974.0 09:00 11:15 and replace seals. S/0 and hang up at 14,964'MD with 20k. Role pumps and wash down until seals engage. Landed hanger and confirmed alignment through production port. 6/9/2017 6/9/2017 0.50 COMPZ2 RPCOMP PRTS T Tested hanger seals to 250/5000 psi 14,974.0 14,974.0 11:15 11:45 for 5 min and test held. 6/9/2017 6/9/2017 1.00 COMPZ2 RPCOMP RUNL P Dropped 1 7/8"ball and rod. filed 14,974.0 14,974.0 11:45 12:45 lines w/9.5 brine and pressure tested surface lines to 4300 psi. 6/9/2017 6/9/2017 1.75 COMPZ2 RPCOMP PRTS P Pressure test tubing to 500 psi for 5 14,974.0 14,974.0 12:45 14:30 min,continued up to 3800 psi for 30 min. Tests held. Packer set at 1800 psi. Built pressure up to 4200 psi and held for 30 min. Test held. 6/9/2017 6/9/2017 1.00 COMPZ2 .RPCOMP PRTS P Bleed tubing to 2200 psi and tested IA 14,974.0 14,974.0 14:30 15:30 to 3300 psi for 30 min,Test held. bleed IA and tubing to 0 psi. Pressured up IA to 2950 psi and sheared SOV. Confirmed clear w/10 bbls pumped at 1 bpm, 1450 psi. 6/9/2017 6/9/2017 1.25 COMPZ2 WHDBOP MPSP P R/D test equipment and pulled landing 14,974.0 0.0 15:30 16:45 joint. Installed HP-BPV as per FMC and tested to 2500 psi for 15 min. Page 33/34 Report Printed: 6/12/2017 Operations Summary (with TimeloRepths) ;, a.We115 CD5-17 ConocoPhillips OIda k.$ Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P T-X Operation (ftKB) End Depth(ftKB) 6/9/2017 6/9/2017 1.25 COMPZ2 WHDBOP WWWH P M/U stack washer and flush stack. 0.0 0.0 16:45 18:00 B/D choke and kill lines. 6/9/2017 6/9/2017 1.25 COMPZ2 WHDBOP NUND P N/D MPD equipment. 0.0 0.0 18:00 19:15 6/9/2017 6/9/2017 1.75 COMPZ2 WHDBOP NUND P N/D BOPE and change out saver sub. 0.0 0.0 19:15 21:00 6/9/2017 6/9/2017 2.00 COMPZ2 WHDBOP NUND P N/U tree and adapter as per FMC. 0.0 0.0 21:00 23:00 Continue to C/O saver sub. 6/9/2017 6/10/2017 1.00 COMPZ2 WHDBOP PRTS P Fill tree w/diesel and test to 250/5000 0.0 0.0 23:00 00:00 psi for 10 min each. 6/10/2017 6/10/2017 0.50 COMPZ2 WHDBOP PRTS P Finish testing tree to 5000 psi for 10 0.0 0.0 00:00 00:30 min. 6/10/2017 6/10/2017 0.50 COMPZ2 WHDBOP RURD P Secure well and rig down test 0.0 0.0 00:30 01:00 equipment. Clear and clean rig floor. 6/10/2017 6/10/2017 22.00 COMPZ2 MOVE PULD P L/D 4"DP from derrick and remove 0.0 0.0 01:00 23:00 WWT SS. 6/10/2017 6/11/2017 1.00 COMPZ2 MOVE DMOB P L/D mouse hole, B/D steam lines,and 0.0 23:00 00:00 work on rig move check list. "Released rig at 24:00 hrs" Page 34/34 Report Printed: 6/12/2017 • S NADConversion Western North Slope CD5 Alpine West Pad CD5-17 CD5-17 Definitive Survey Report 23 June, 2017 • • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Project Western North Slope,North Slope Alaska,United States Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well CD5-17 Well Position +N/-S 0.00 usft Northing: 5,965,829.15 usft Latitude: 70°18'49.454 N +E/-W 0.00 usft Easting: 349,231.16 usft Longitude: 151°13'19.003 W Position Uncertainty 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 34.00 usft Wellbore CD5-17 Magnetics Model Name Sample Date Declination Dip Angitt • Field Strength{ ..'. n BGGM2016 5/1/2017 17.18 80.81 57,504 Design CD5-17 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 36.28 Vertical Section Depth From(TVD) +N/-S ' +E1-W Direction / i,% usfk %(usft) (usft) i 11 3 - 36.28 0.00 0.00 119.65 Survey Program Date ,l'% t From To � F (usft) (usft) Survey(Wellbore) Tool Mame Desctiption �; Sury Coate 75.00 724.00 CD5-17 Srvy 1-SLB_NSG+SShot(CD5 GYD-GC-SS Gyrodata gyro single shots 4/26/2017 1:49:' 752.26 2,158.50 CD5-17 Srvy 2-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 4/26/2017 2:02:' 2,258.39 12,610.16 CD5-17 Srvy 3-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 4/29/2017 8:02: 12,710.15 15,781.33 CD5-17 Srvy 4-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/4/2017 9:35:0' 15,875.88 28,585.18 CD5-17 Srvy 5-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/14/2017 1:31:' Survey "..•..: II Map Map Vertical ,MD Me, ,!fes"':'' TVOSS +N/.S +E/-W Northing Easting DLS_, Section ((usft) (1 ,,° (usft) ('usft) > (usft) (usft) (ft) (ft) (°/100')' (ft) Survey Tool Name 75.00 0.30 225.88 75.00 4.72 -0.07 -0.07 5,965,829.08 349,231.09 0.77 -0.03 GYD-GC-SS(1) 174.00 0.23 163.07 174.00 103.72 -0.44 -0.20 5,965,828.71 349,230.95 0.29 0.04 GYD-GC-SS(1) 265.00 0.16 166.95 265.00 194.72 -0.74 -0.12 5,965,828.41 349,231.03 0.08 0.26 GYD-GC-SS(1) 357.00 0.46 311.15 357.00 286.72 -0.62 -0.37 5,965,828.54 349,230.78 0.65 -0.01 GYD-GC-SS(1) 449.00 0.92 346.56 448.99 378.71 0.32 -0.89 5,965,829.49 349,230.27 0.62 -0.93 GYD-GC-SS(1) 540.00 2.20 359.56 539.96 469.68 2.75 -1.15 5,965,831.93 349,230.07 1.50 -2.36 GYD-GC-SS(1) 637.00 3.21 4.98 636.85 566.57 7.32 -0.93 5,965,836.49 349,230.38 1.07 -4.43 GYD-GC-SS(1) 724.00 4.00 8.00 723.67 653.39 12.75 -0.29 5,965,841.91 349,231.12 0.93 -6.56 GYD-GC-SS(1) 752.26 3.90 7.31 751.87 681.59 14.68 -0.03 5,965,843.83 349,231.42 0.39 -7.29 MWD+IFR-AK-CAZ-SC(2) 846.03 3.83 42.96 845.44 775.16 20.14 2.51 5,965,849.23 349,234.07 2.52 -7.79 MVVD+IFR-AK-CAZ-SC(2) 6/23/2017 9:23:57AM Page 2 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method:. Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey df . � ' MD Inc Azi TVD TVDSS iNJ-S * W- Northing Easting DLS Section (usft) (°) (0) (usft) (waft) (usft) (us�f) (ft) (ft) (°/1007 (ft) Survey'( olgame 940.46 3.50 87.83 939.69 869.41 22.56 7.54 5,965,851.55 349,239.15 2.98 -4.61 MWD+IFR-AK-CAZ-SC(2) 1,033.37 5.09 109.77 1,032.34 962.06 21.27 14.25 5,965,850.13 349,245.83 2.43 1.86 MWD+IFR-AK-CAZ-SC(2) 1,127.46 7.31 115.82 1,125.88 1,055.60 17.25 23.57 5,965,845.92 349,255.07 2.46 11.95 MWD+IFR-AK-CAZ-SC(2) 1,221.27 8.37 123.44 1,218.81 1,148.53 10.89 34.64 5,965,839.34 349,266.01 1.58 24.72 M1MD+IFR-AK-CAZ-SC(2) 1,315.61 9.72 126.32 1,311.98 1,241.70 2.39 46.79 5,965,830.60 349,277.98 1.51 39.48 MWD+IFR-AK-CAZ-SC(2) 1,409.83 11.35 130.09 1,404.61 1,334.33 -8.30 60.29 5,965,819.65 349,291.26 1.88 56.50 MWD+IFR-AK-CAZ-SC(2) 1,504.04 13.36 128.38 1,496.63 1,426.35 -21.03 75.91 5,965,806.61 349,306.63 2.17 76.37 MWD+IFR-AK-CAZ-SC(2) 1,598.23 14.58 123.99 1,588.04 1,517.76 -34.41 94.28 5,965,792.86 349,324.72 1.71 98.95 MWD+IFR-AK-CAZ-SC(2) 1,693.35 15.38 120.55 1,679.93 1,609.65 -47.52 115.07 5,965,779.34 349,345.24 1.26 123.50 MWD+IFR-AK-CAZ-SC(2) 1,787.28 15.98 120.65 1,770.36 1,700.08 -60.44 136.92 5,965,765.98 349,366.82 0.64 148.89 MWD+IFR-AK-CAZ-SC(2) 1,881.01 16.66 122.75 1,860.31 1,790.03 -74.29 159.32 5,965,751.69 349,388.94 0.96 175.20 MWD+IFR-AK-CAZ-SC(2) 1,974.87 17.59 127.09 1,950.01 1,879.73 -90.12 181.95 5,965,735.40 349,411.25 1.68 202.70 MWD+IFR-AK-CAZ-SC(2) 2,067.51 20.00 131.08 2,037.71 1,967.43 -108.97 205.06 5,965,716.09 349,433.97 2.95 232.12 MWD+IFR-AK-CAZ-SC(2) 2,158.50 22.62 131.70 2,122.47 2,052.19 -130.84 229.86 5,965,693.73 349,458.33 2.89 264.49 MWD+IFR-AK-CAZ-SC(2) 2,222.00 23.57 130.00 2,180.88 2,110.60 -147.13 248.70 5,965,677.07 349,476.84 1.83 288.92 MVVD+IFR-AK-CAZ-SC(3) 103f4"x 13-1/2" „° F, 2,258.39 24.13 129.08 2,214.17 2,143.89 -156.50 260.05 5,965,667.48 349,488.00 1.83 303.42 MWD+IFR-AK-CAZ-SC(3) 2,350.92 26.30 124.23 2,297.88 2,227.60 -179.95 291.69 5,965,643.39 349,519.16 3.24 342.52 MWD+IFR-AK-CAZ-SC(3) 2,445.50 29.68 116.85 2,381.41 2,311.13 -202.33 329.93 5,965,620.25 349,556.93 5.11 386.82 11WD+IFR-AK-CAZ-SC(3) 2,539.25 32.95 112.44 2,461.51 2,391.23 -222.55 374.22 5,965,599.14 349,600.81 4.26 435.32 MWD+IFR-AK-CAZ-SC(3) 2,633.14 35.50 113.03 2,539.13 2,468.85 -242.97 422.92 5,965,577.76 349,649.08 2.74 487.74 MWD+IFR-AK-CAZ-SC(3) 2,728.03 38.47 114.03 2,614.92 2,544.64 -265.77 475.24 5,965,553.91 349,700.93 3.19 544.49 MWD+IFR-AK-CAZ-SC(3) 2,820.61 41.14 114.32 2,686.04 2,615.76 -290.04 529.30 5,965,528.56 349,754.49 2.89 603.48 MWD+IFR-AK-CAZ-SC(3) 2,913.65 44.15 114.56 2,754.47 2,684.19 -316.12 586.68 5,965,501.34 349,811.33 3.24 666.25 MWD+IFR-AK-CAZ-SC(3) 3,008.09 47.32 115.43 2,820.38 2,750.10 -344.71 647.96 5,965,471.53 349,872.02 3.42 733.64 MWD+IFR-AK-CAZ-SC(3) 3,103.13 50.50 117.13 2,882.83 2,812.55 -376.44 712.16 5,965,438.52 349,935.57 3.61 805.14 MWD+IFR-AK-CAZ-SC(3) 3,197.52 53.49 119.35 2,940.95 2,870.67 -411.65 777.66 5,965,402.00 350,000.34 3.67 879.47 MWD+IFR-AK-CAZ-SC(3) 3,291.64 56.93 120.82 2,994.65 2,924.37 -450.41 844.51 5,965,361.91 350,066.40 3.87 956.75 MWD+IFR-AK-CAZ-SC(3) 3,385.92 60.47 122.40 3,043.62 2,973.34 -492.64 913.10 5,965,318.31 350,134.11 4.02 1,037.25 MWD+IFR-AK-CAZ-SC(3) 3,480.20 63.08 122.55 3,088.21 3,017.93 -537.24 983.17 5,965,272.32 350,203.27 2.77 1,120.21 MWD+IFR-AK-CAZ-SC(3) 3,574.10 65.58 121.83 3,128.88 3,058.60 -582.32 1,054.79 5,965,225.82 350,273.97 2.75 1,204.75 MWD+IFR-AK-CAZ-SC(3) 3,668.21 65.48 121.84 3,167.86 3,097.58 -627.50 1,127.56 5,965,179.19 350,345.81 0.11 1,290.34 MWD+IFR-AK-CAZ-SC(3) 3,762.57 66.12 122.24 3,206.54 3,136.26 -673.16 1,200.52 5,965,132.07 350,417.83 0.78 1,376.34 MWD+IFR-AK-CAZ-SC(3) 3,857.38 66.13 123.47 3,244.92 3,174.64 -720.19 1,273.34 5,965,083.59 350,489.69 1.19 1,462.90 MWD+IFR-AK-CAZ-SC(3) 3,950.33 65.93 124.85 3,282.68 3,212.40 -767.88 1,343.62 5,965,034.50 350,559.00 1.37 1,547.57 MWD+IFR-AK-CAZ-SC(3) 4,044.30 65.98 124.50 3,320.97 3,250.69 -816.70 1,414.20 5,964,984.28 350,628.57 0.34 1,633.05 MWD+IFR-AK-CAZ-SC(3) 4,138.39 66.02 124.74 3,359.24 3,288.96 -865.54 1,484.93 5,964,934.04 350,698.31 0.24 1,718.68 MWD+IFR-AK-CAZ-SC(3) 4,233.64 65.21 124.56 3,398.56 3,328.28 -914.86 1,556.30 5,964,883.29 350,768.66 0.87 1,805.11 MWD+IFR-AK-CAZ-SC(3) 4,328.19 65.41 121.55 3,438.07 3,367.79 -961.71 1,628.29 5,964,835.01 350,839.69 2.90 1,890.85 MWD+IFR-AK-CAZ-SC(3) 4,421.96 65.25 120.68 3,477.20 3,406 92 -1,005.74 1,701.24 5,964,789.53 350,911.74 0.86 1,976.03 MWD+IFR-AK-CAZ-SC(3) 6/23/2017 9:23:57AM Page 3 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey T Map Map Vertical MD Inc Azi TVD TVDSS +N1-S +El-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) „ (ft) (°1100') (ft) Survey Tool Name 4,515.82 65.45 118.69 3,516.35 3,446.07 -1,047.99 1,775.35 5,964,745.81 350,984.98 1.94 2,061.33 MWD+IFR-AK-CAZ-SC(3) 4,609.24 65.37 117.86 3,555.23 3,484.95 -1,088.23 1,850.16 5,964,704.08 351,058.96 0.81 2,146.25 MWD+IFR-AK-CAZ-SC(3) 4,704.90 65.47 117.80 3,595.02 3,524.74 -1,128.84 1,927.09 5,964,661.93 351,135.05 0.12 2,233.20 MWD+IFR-AK-CAZ-SC(3) 4,799.97 65.60 117.53 3,634.39 3,564.11 -1,169.01 2,003.73 5,964,620.23 351,210.87 0.29 2,319.68 MWD+IFR-AK-CAZ-SC(3) 4,892.17 65.18 118.84 3,672.79 3,602.51 -1,208.60 2,077.61 5,964,579.16 351,283.93 1.37 2,403.48 MWD+IFR-AK-CAZ-SC(3) 4,984.27 65.38 119.69 3,711.30 3,641.02 -1,249.50 2,150.60 5,964,536.81 351,356.07 0.87 2,487.14 MWD+IFR-AK-CAZ-SC(3) 5,078.77 65.73 119.40 3,750.41 3,680.13 -1,291.92 2,225.44 5,964,492.90 351,430.04 0.46 2,573.16 MWD+IFR-AK-CAZ-SC(3) 5,173.62 65.75 118.22 3,789.38 3,719.10 -1,333.59 2,301.21 5,964,449.72 351,504.96 1.13 2,659.63 MWD+IFR-AK-CAZ-SC(3) 5,266.91 66.24 117.73 3,827.34 3,757.06 -1,373.57 2,376.47 5,964,408.24 351,579.40 0.71 2,74481 MWD+IFR-AK-CAZ-SC(3) 5,360.46 66.45 116.21 3,864.87 3,794.59 -1,412.43 2,452.84 5,964,367.86 351,654.96 1.51 2,830.40 MWD+IFR-AK-CAZ-SC(3) 5,454.61 66.54 116.02 3,902.42 3,832.14 -1,450.43 2,530.36 5,964,328.31 351,731.70 0.21 2,916.58 MWD+IFR-AK-CAZ-SC(3) 5,547.91 66.56 117.44 3,939.55 3,869.27 -1,488.93 2,606.81 5,964,288.29 351,807.35 1.40 3,002.06 MWD+IFR-AK-CAZ-SC(3) 5,642.49 66.44 118.33 3,977.27 3,906.99 -1,529.50 2,683.47 5,964,246.20 351,883.18 0.87 3,088.75 MWD+IFR-AK-CAZ-SC(3) 5,736.57 66.47 119.22 4,014.85 3,944.57 -1,571.01 2,759.07 5,964,203.17 351,957.92 0.87 3,174.98 MWD+IFR-AK-CAZ-SC(3) 5,827.97 66.50 119.49 4,051.32 3,981.04 -1,612.10 2,832.11 5,964,160.63 352,030.13 0.27 3,258.79 MWD+IFR-AK-CAZ-SC(3) 5,922.64 66.37 119.40 4,089.17 4,018.89 -1,654.76 2,907.68 5,964,116.47 352,104.81 0.16 3,345.57 MWD+IFR-AK-CAZ-SC(3) 6,016.58 66.57 120.46 4,126.67 4,056.39 -1,697.73 2,982.32 5,964,072.01 352,178.57 1.06 3,431.69 MWD+IFR-AK-CAZ-SC(3) 6,111.44 66.40 121.50 4,164.52 4,094.24 -1,742.50 3,056.89 5,964,025.75 352,252.23 1.02 3,518.65 MWD+IFR-AK-CAZ-SC(3) 6,206.13 66.64 121.41 4,202.25 4,131.97 -1,787.82 3,130.98 5,963,978.96 352,325.38 0.27 3,605.46 MWD+IFR-AK-CAZ-SC(3) 6,299.83 66.39 121.85 4,239.59 4,169.31 -1,832.89 3,204.15 5,963,932.43 352,397.63 0.51 3,691.35 MWD+IFR-AK-CAZ-SC(3) 6,394.66 65.76 121.49 4,278.04 4,207.76 -1,878.40 3,277.93 5,963,885.45 352,470.47 0.75 3,777.97 MWD+IFR-AK-CAZ-SC(3) 6,488.51 65.43 120.38 4,316.82 4,246.54 -1,922.33 3,351.23 5,963,840.06 352,542.87 1.13 3,863.41 MWD+IFR-AK-CAZ-SC(3) 6,582.69 65.40 119.99 4,356.00 4,285.72 -1,965.39 3,425.26 5,963,795.53 352,616.01 0.38 3,949.05 MWD+IFR-AK-CAZ-SC(3) 6,677.49 65.25 119.38 4,395.58 4,325.30 -2,008.05 3,500.10 5,963,751.37 352,689.98 0.61 4,035.20 MVVD+IFR-AK-CAZ-SC(3) 6,772.09 65.43 117.93 4,435.05 4,364.77 -2,049.28 3,575.54 5,963,708.65 352,764.57 1.41 4,121.15 MWD+IFR-AK-CAZ-SC(3) 6,865.63 65.50 117.01 4,473.90 4,403.62 -2,088.53 3,651.04 5,963,667.89 352,839.26 0.90 4,206.18 MWD+IFR-AK-CAZ-SC(3) 6,960.60 65.92 118.11 4,512.96 4,442.68 -2,128.58 3,727.78 5,963,626.31 352,915.17 1.14 4,292.69 MWD+IFR-AK-CAZ-SC(3) 7,054.41 65.87 117.03 4,551.28 4,481.00 -2,168.21 3,803.68 5,963,585.16 352,990.26 1.05 4,378.26 MWD+IFR-AK-CAZ-SC(3) 7,148.47 66.03 117.67 4,589.61 4,519.33 -2,207.68 3,879.97 5,963,544.18 353,065.74 0.64 4,464.08 MWD+IFR-AK-CAZ-SC(3) 7,243.58 66.19 118.79 4,628.13 4,557.85 -2,248.81 3,956.59 5,963,501.52 353,141.51 1.09 4,551.01 MWD+IFR-AK-CAZ-SC(3) 7,337.39 66.61 119.75 4,665.69 4,595.41 -2,290.84 4,031.58 5,963,458.00 353,215.63 1.04 4,636.97 MWD+IFR-AK-CAZ-SC(3) 7,431.42 66.50 120.46 4,703.10 4,632.82 -2,334.11 4,106.21 5,963,413.24 353,289.37 0.70 4,723.24 MWD+IFR-AK-CAZ-SC(3) 7,526.27 66.64 121.35 4,740.81 4,670.53 -2,378.81 4,180.88 5,963,367.05 353,363.12 0.87 4,810.25 MWD+IFR-AK-CAZ-SC(3) 7,620.32 66.41 122.87 4,778.28 4,708.00 -2,424.66 4,253.94 5,963,319.75 353,435.25 1.50 4,896.43 MWD+IFR-AK-CAZ-SC(3) 7,714.93 66.32 122.68 4,816.21 4,745.93 -2,471.58 4,326.82 5,963,271.38 353,507.16 0.21 4,982.97 MWD+IFR-AK-CAZ-SC(3) 7,808.66 66.28 121.68 4,853.89 4,783.61 -2,517.29 4,399.46 5,963,224.22 353,578.86 0.98 5,068.71 MVVD+IFR-AK-CAZ-SC(3) 7,903.34 66.39 119.52 4,891.89 4,821.61 -2,561.43 4,474.10 5,963,178.60 353,652.59 2.09 5,155.41 M1M3+IFR-AK-CAZ-SC(3) 7,998.36 66.40 118.48 4,929.94 4,859.66 -2,603.64 4,550.25 5,963,134.87 353,727.88 1.00 5,242.48 MW1D+IFR-AK-CAZ-SC(3) 8,093.00 65.91 117.98 4,968.20 4,897.92 -2,644.58 4,626.51 5,963,092.40 353,803.30 0.71 5,329.01 MWD+IFR-AK-CAZ-SC(3) 8,186.18 65.34 117.70 5,006.66 4,936.38 -2,684.22 4,701.56 5,963,051.27 353,877.53 0.67 5,413.84 MWD+IFR-AK-CAZ-SC(3) 6/23/2017 9:23:57AM Page 4 COMPASS 5000.1 Build 74 • • Definitive Survey Report • Com,'ny.,, NADConversion Local Co-ordinate Reference: Well CD5-17 Proms'; , Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual©70.28usft(D19) Vlfelh CD5-17 North Reference: True tifetlboon CD5-17 Survey Calculation Method: Minimum Curvature sign; CD5-17 Database: OAKEDMP2 ey i Map Map Vertical .!! TVD TOW +N14 +E1-1Ai Northing Fasting DLS Section '40t) .( } (aft} t) (weft) {ft) (ft) (°i100') (ft) Survey Tool Name 8,280.66 65.35 117.35 5,046.07 4,975.79 -2,723.90 4,777.71 5,963,010.07 353,952.86 0.34 5,499.65 MWD+IFR-AK-CAZ-SC(3) 8,375.48 65.52 116.07 5,085.49 5,015.21 -2,762.66 4,854.74 5,962,969.77 354,029.09 1.24 5,585.77 MWD+IFR-AK-CAZ-SC(3) 8,470.22 65.44 117.09 5,124.81 5,054.53 -2,801.23 4,931.83 5,962,929.67 354,105.38 0.98 5,671.84 MWD+IFR-AK-CAZ-SC(3) 8,564.22 65.42 117.51 5,163.90 5,093.62 -2,840.44 5,007.79 5,962,888.95 354,180.54 0.41 5,757.26 MWD+IFR-AK-CAZ-SC(3) 8,658.87 65.54 117.13 5,203.18 5,132.90 -2,879.96 5,084.30 5,962,847.90 354,256.24 0.39 5,843.30 MWD+IFR-AK-CAZ-SC(3) 8,751.81 65.37 116.57 5,241.79 5,171.51 -2,918.15 5,159.73 5,962,808.21 354,330.88 0.58 5,927.74 MWD+IFR-AK-CAZ-SC(3) 8,846.18 65.84 118.36 5,280.77 5,210.49 -2,957.78 5,235.98 5,962,767.05 354,406.31 1.80 6,013.62 MWD+IFR-AK-CAZ-SC(3) 8,941.31 65.49 118.83 5,319.97 5,249.69 -2,999.27 5,312.09 5,962,724.05 354,481.56 0.58 6,100.28 MWD+IFR-AK-CAZ-SC(3) 9,035.98 66.20 118.94 5,358.71 5,288.43 -3,041.00 5,387.72 5,962,680.82 354,556.34 0.76 6,186.65 MWD+IFR-AK-CAZ-SC(3) 9,128.38 66.61 119.62 5,395.69 5,325.41 -3,082.41 5,461.58 5,962,637.93 354,629.34 0.81 6,271.32 MWD+IFR-AK-CAZ-SC(3) 9,222.00 66.47 121.23 5,432.96 5,362.68 -3,125.90 5,535.63 5,962,592.97 354,702.50 1.58 6,357.19 MWD+IFR-AK-CAZ-SC(3) 9,315.92 66.45 121.79 5,470.47 5,400.19 -3,170.90 5,609.04 5,962,546.51 354,774.98 0.55 6,443.25 MWD+IFR-AK-CAZ-SC(3) 9,408.74 66.38 121.77 5,507.61 5,437.33 -3,215.70 5,681.35 5,962,500.27 354,846.38 0.08 6,528.26 MWD+IFR-AK-CAZ-SC(3) 9,502.55 66.39 121.50 5,545.19 5,474.91 -3,260.78 5,754.53 5,962,453.73 354,918.63 0.26 6,614.16 MWD+IFR-AK-CAZ-SC(3) 9,597.09 66.41 121.98 5,583.04 5,512.76 -3,306.36 5,828.21 5,962,406.68 354,991.37 0.47 6,700.74 MWD+IFR-AK-CAZ-SC(3) 9,691.58 66.38 121.74 5,620.88 5,550.60 -3,352.06 5,901.75 5,962,359.52 355,063.98 0.23 6,787.26 MWD+IFR-AK-CAZ-SC(3) 9,785.26 66.44 120.19 5,658.37 5,588.09 -3,396.23 5,975.36 5,962,313.88 355,136.68 1.52 6,873.08 MVVD+IFR-AK-CAZ-SC(3) 9,879.51 66.61 118.65 5,695.92 5,625.64 -3,438.69 6,050.66 5,962,269.92 355,211.11 1.51 6,959.53 MWD+IFR-AK-CAZ-SC(3) 9,973.79 66.55 118.53 5,733.39 5,663.11 -3,480.09 6,126.62 5,962,227.01 355,286.22 0.13 7,046.03 MWD+IFR-AK-CAZ-SC(3) 10,066.44 65.97 119.87 5,770.69 5,700.41 -3,521.46 6,200.65 5,962,184.16 355,359.40 1.46 7,130.83 MWD+IFR-AK-CAZ-SC(3) 10,161.22 66.07 119.43 5,809.21 5,738.93 -3,564.30 6,275.91 5,962,139.82 355,433.78 0.44 7,217.43 MWD+IFR-AK-CAZ-SC(3) 10,255.83 65.99 119.44 5,847.65 5,777.37 -3,606.79 6,351.20 5,962,095.83 355,508.19 0.09 7,303.88 MWD+IFR-AK-CAZ-SC(3) 10,350.32 65.85 119.79 5,886.20 5,815.92 -3,649.42 6,426.20 5,962,051.71 355,582.32 0.37 7,390.15 MWD+IFR-AK-CAZ-SC(3) 10,444.68 65.85 119.01 5,924.80 5,854.52 -3,691.69 6,501.21 5,962,007.95 355,656.46 0.75 7,476.25 MWD+IFR-AK-CAZ-SC(3) 10,538.98 65.94 117.89 5,963.32 5,893.04 -3,732.69 6,576.89 5,961,965.43 355,731.29 1.09 7,562.30 MWD+IFR-AK-CAZ-SC(3) 10,632.74 66.08 118.43 6,001.44 5,931.16 -3,773.12 6,652.41 5,961,923.50 355,805.98 0.55 7,647.93 MWD+IFR-AK-CAZ-SC(3) 10,727.62 65.95 119.06 6,040.01 5,969.73 -3,814.81 6,728.42 5,961,880.30 355,881.13 0.62 7,734.61 MWD+IFR-AK-CAZ-SC(3) 10,819.25 65.94 118.24 6,077.36 6,007.08 -3,854.92 6,801.85 5,961,838.72 355,953.73 0.82 7,818.27 MWD+IFR-AK-CAZ-SC(3) 10,913.44 65.89 119.22 6,115.80 6,045.52 -3,896.26 6,877.25 5,961,795.88 356,028.28 0.95 7,904.25 MWD+IFR-AK-CAZ-SC(3) 11,007.68 65.92 119.20 6,154.27 6,083.99 -3,938.24 6,952.34 5,961,752.41 356,102.51 0.04 7,990.27 MWD+IFR-AK-CAZ-SC(3) 11,101.82 65.86 118.46 6,192.73 6,122.45 -3,979.68 7,027.61 5,961,709.47 356,176.93 0.72 8,076.19 MWD+IFR-AK-CAZ-SC(3) 11,197.31 65.92 118.40 6,231.73 6,161.45 -4,021.17 7,104.26 5,961,666.45 356,252.73 0.09 8,163.33 MWD+IFR-AK-CAZ-SC(3) 11,291.96 65.97 117.94 6,270.31 6,200.03 -4,061.97 7,180.46 5,961,624.13 356,328.08 0.45 8,249.73 MWD+IFR-AK-CAZ-SC(3) 11,386.07 66.39 118.51 6,308.32 6,238.04 -4,102.69 7,256.31 5,961,581.90 356,403.09 0.71 8,335.80 MWD+IFR-AK-CAZ-SC(3) 11,481.39 66.45 118.11 6,346.45 6,276.17 -4,144.12 7,333.22 5,961,538.93 356,479.15 0.39 8,423.13 MWD+IFR-AK-CAZ-SC(3) 11,574.65 66.29 119.02 6,383.84 6,313.56 -4,184.97 7,408.26 5,961,496.59 356,553.35 0.91 8,508.56 M1M3+IFR-AK-CAZ-SC(3) 11,668.96 66.42 118.83 6,421.66 6,351.38 -4,226.76 7,483.88 5,961,453.29 356,628.11 0.23 8,594.94 MWD+IFR-AK-CAZ-SC(3) 11,763.99 66.36 119.54 6,459.72 6,389.44 -4,269.22 7,559.90 5,961,409.32 356,703.25 0.69 8,682.01 MWD+IFR-AK-CAZ-SC(3) 11,857.95 66.36 119.68 6,497.40 6,427.12 -4,311.75 7,634.73 5,961,365.30 356,777.21 0.14 8,768.09 MWD+IFR-AK-CAZ-SC(3) 11,952.69 66.48 119.55 6,535.30 6,465.02 -4,354.66 7,710.22 5,961,320.89 356,851.82 0.18 8,854.92 MWD+IFR-AK-CAZ-SC(3) 6/23/2017 9:23:57AM Page 5 COMPASS 5000.1 Build 74 • . Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope ND Reference: CD5-17 actual©70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Sunray Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +NI-S +EI-W Northing Easting OLS Section (usft) „ (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) r,100') (ft) Survey Tool Name 12,046.22 66.45 120.74 6,572.64 6,502.36 -4,397.72 7,784.37 5,961,276 35 356,925.08 1.17 8,940.66 MWD+IFR-AK-CAZ-SC(3) 12,140.19 66.43 120.20 6,610.21 6,539.93 -4,441.40 7,858.61 5,961,231.19 356,998.43 0.53 9,026.79 MWD+IFR-AK-CAZ-SC(3) 12,234.50 65.94 119.92 6,648.29 6,578.01 -4,484.61 7,933.29 5,961,186.49 357,072.21 0.59 9,113.07 MWD+IFR-AK-CAZ-SC(3) 12,328.29 65.78 122.06 6,686.65 6,616.37 -4,528.68 8,006.65 5,961,140.96 357,144.67 2.09 9,198.63 MWD+IFR-AK-CAZ-SC(3) 12,420.99 65.85 121.04 6,724.63 6,654.35 -4,572.92 8,078.71 5,961,095.28 357,215.83 1.01 9,283.14 MW1D+IFR-AK-CAZ-SC(3) 12,516.42 65.92 120.24 6,763.62 6,693.34 -4,617.31 8,153.65 5,961,049.40 357,289.86 0.77 9,370.23 MWD+IFR-AK-CAZ-SC(3) 12,610.16 65.86 120.52 6,801.91 6,731.63 -4,660.59 8,227.47 5,961,004.66 357,362.78 0.28 9,455.79 MWD+IFR-AK-CAZ-SC(3) 12,710.15 66.18 121.14 6,842.55 6,772.27 -4,707.41 8,305.92 5,960,956.27 357,440.27 0.65 9,547.12 MWD+IFR-AK-CAZ-SC(4) 12,801.12 66.21 120.91 6,879.26 6,808.98 -4,750.31 8,377.24 5,960,911.95 357,510.71 0.23 9,630.33 MVVD+IFR-AK-CAZ-SC(4) 12,892.95 66.15 121.75 6,916.35 6,846.07 -4,793.99 8,449.00 5,960,866.84 357,581.57 0.84 9,714.30 MWD+IFR-AK-CAZ-SC(4) 12,988.30 66.16 122.56 6,954.90 6,884.62 -4,840.40 8,522.83 5,960,818.96 357,654.45 0.78 9,801.43 MWD+IFR-AK-CAZ-SC(4) 13,082.95 66.22 122.77 6,993.11 6,922.83 -4,887.14 8,595.73 5,960,770.77 357,726.39 0.21 9,887.90 MWD+IFR-AK-CAZ-SC(4) 13,176.69 66.23 123.28 7,030.90 6,960.62 -4,933.89 8,667.65 5,960,722.59 357,797.36 0.50 9,973.54 MWD+IFR-AK-CAZ-SC(4) 13,271.16 66.02 124.22 7,069.14 6,998.86 -4,981.88 8,739.48 5,960,673.17 357,868.20 0.94 10,059.70 MWD+IFR-AK-CAZ-SC(4) 13,366.06 66.03 124.19 7,107.70 7,037.42 -5,030.63 8,811.19 5,960,623.00 357,938.92 0.03 10,146.14 MWD+IFR-AK-CAZ-SC(4) 13,459.68 66.00 124.06 7,145.75 7,075.47 -5,078.61 8,882.00 5,960,573.60 358,008.74 0.13 10,231.42 MWD+IFR-AK-CAZ-SC(4) 13,553.48 67.42 123.06 7,182.84 7,112.56 -5,126.24 8,953.80 5,960,524.55 358,079.56 1.80 10,317.37 MWD+IFR-AK-CAZ-SC(4) 13,647.26 69.47 123.67 7,217.29 7,147.01 5,174.21 9,026.64 5,960,475.13 358,151.42 2.27 10,404.41 MWD+IFR-AK-CAZ-SC(4) 13,741.76 70.61 127.33 7,249.56 7,179.28 -5,225.78 9,098.93 5,960,422.12 358,222.65 3.83 10,492.75 MWD+IFR-AK-CAZ-SC(4) 13,836.07 71.75 129.94 7,279.99 7,209.71 -5,281.52 9,168.65 5,960,365.00 358,291.23 2.88 10,580.91 MWD+IFR-AK-CAZ-SC(4) 13,930.32 73.24 133.45 7,308.35 7,238.07 -5,341.30 9,235.74 5,960,303.88 358,357.11 3.89 10,668.80 MWD+IFR-AK-CAZ-SC(4) 14,024.65 73.73 134.67 7,335.16 7,264.88 -5,404.19 9,300.73 5,960,239.71 358,420.82 1.34 10,756.39 MWD+IFR-AK-CAZ-SC(4) 14,118.08 74.47 136.74 7,360.76 7,290.48 5,468.50 9,363.47 5,960,174.15 358,482.25 2.27 10,842.73 M1IvD+IFR-AK-CAZ-SC(4) 14,213.13 75.55 139.49 7,385.35 7,315.07 -5,536.86 9,424.76 5,960,104.59 358,542.15 3.02 10,929.81 MWD+IFR-AK-CAZ-SC(4) 14,307.40 76.12 141.39 7,408.42 7,338.14 -5,607.32 9,482.97 5,960,032.97 358,598.93 2.05 11,015.26 MWD+IFR-AK-CAZ-SC(4) 14,401.35 77.45 144.16 7,429.90 7,359.62 -5,680.14 9,538.29 5,959,959.06 358,652.77 3.20 11,099.36 MWD+IFR-AK-CAZ-SC(4) 14,495.74 78.51 146.18 7,449.56 7,379.28 -5,755.92 9,591.01 5,959,882.25 358,703.95 2.38 11,182.67 MWD+IFR-AK-CAZ-SC(4) 14,590.65 80.46 147.99 7,466.88 7,396.60 -5,834.25 9,641.71 5,959,802.92 358,753.07 2.78 11,265.49 M1MD+IFR-AK-CAZ-SC(4) 14,684.00 82.99 146.87 7,480.32 7,410.04 -5,912.09 9,691.44 5,959,724.10 358,801.22 2.96 11,347.22 MWD+IFR-AK-CAZ-SC(4) 14,777.45 82.87 147.40 7,491.82 7,421.54 -5,989.99 9,741.76 5,959,645.21 358,849.97 0.58 11,429.49 MWD+IFR-AK-CAZ-SC(4) 14,872.28 82.99 147.77 7,503.49 7,433.21 -6,069.44 9,792.21 5,959,564.78 358,898.80 0.41 11,512.64 MWD+IFR-AK-CAZ-SC(4) 14,967.00 83.18 147.28 7,514.89 7,444.61 -6,148.76 9,842.70 5,959,484.46 358,947.68 0.55 11,595.76 MWD+IFR-AK-CAZ-SC(4) 15,061.18 83.84 148.58 7,525.54 7,455.26 -6,228.06 9,892.38 5,959,404.19 358,995.76 1.54 11,678.17 MWD+IFR-AK-CAZ-SC(4) 15,155.45 83.85 150.84 7,535.65 7,465.37 -6,308.98 9,939.65 5,959,322.34 359,041.39 2.38 11,759.29 MWD+IFR-AK-CAZ-SC(4) 15,250.30 84.43 151.32 7,545.33 7,475.05 -6,391.57 9,985.28 5,959,238.85 359,085.35 0.79 11,839.80 MWD+IFR-AK-CAZ-SC(4) 15,344.66 85.02 152.61 7,554.01 7,483.73 -6,474.50 10,029.44 5,959,155.06 359,127.84 1.50 11,919.21 M1.ND+IFR-AK-CAZ-SC(4) 15,439.04 84.79 152.15 7,562.39 7,492.11 -6,557.80 10,073.02 5,959,070.91 359,169.73 0.54 11,998.30 MWD+IFR-AK-CAZ-SC(4) 15,533.83 83.93 152.86 7,571.71 7,501.43 -6,641.47 10,116.57 5,958,986.39 359,211.59 1.17 12,077.54 MWD+IFR-AK-CAZ-SC(4) 15,628.12 83.59 152.60 7,581.95 7,511.67 -6,724.79 10,159.52 5,958,902.23 359,252.85 0.45 12,156.09 MWD+IFR-AK-CAZ-SC(4) 15,722.90 83.51 152.19 7,592.60 7,522.32 -6,808.25 10,203.16 5,958,817.92 359,294.80 0.44 12,235.30 MWD+IFR-AK-CAZ-SC(4) 6/23/2017 9'23'57AM Page 6 COMPASS 5000.1 Budd 74 • • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi " TVD TVDSS +Ni-S +E/-W Northing Easting DLS Section (usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) 01000 (ft) Survey Tool Name 15,781 33 83.74 152.15 7,599.09 7,528.81 -6,859.60 10,230.27 5,958,766 04 359,320.88 0.40 12,284.27 MWD+IFR-AK-CAZ-SC(4) 15,831.00 84.14 151.08 7,604.33 7,534.05 -6,903.05 10,253.75 5,958,722.13 359,343.48 2.29 12,326.17 MWD+IFR-AK-CAZ-SC(5) 7-5/8"x 1D4/ :- l 15,875.88 84.50 150.11 7,608.78 7,538.50 -6,941.96 10,275.67 5,958,682.79 359,364.62 2.29 12,364.48 MWD+IFR-AK-CAZ-SC(5) 15,970.67 86.42 150.13 7,616.28 7,546.00 -7,023.88 10,322.75 5,958,599.94 359,410.03 2.03 12,445.92 MWD+IFR-AK-CAZ-SC(5) 16,065.16 89.96 151.18 7,619.26 7,548.98 -7,106.19 10,369.02 5,958,516.72 359,454.64 3.91 12,526.86 MWD+IFR-AK-CAZ-SC(5) 16,160.57 91.60 150.50 7,617.97 7,547.69 -7,189.50 10,415.50 5,958,432.51 359,499.44 1.86 12,608.47 MW13+IFR-AK-CAZ-SC(5) 16,255.35 91.27 150.32 7,615.59 7,545.31 -7,271.89 10,462.29 5,958,349.20 359,544.56 0.40 12,689.90 MWD+IFR-AK-CAZ-SC(5) 16,350.12 90.55 150.19 7,614.09 7,543.81 -7,354.17 10,509.30 5,958,266.00 359,589.91 0.77 12,771.46 MWD+IFR-AK-CAZ-SC(5) 16,444.57 89.76 149.53 7,613.83 7,543.55 -7,435.85 10,556.73 5,958,183.39 359,635.68 1.09 12,853.08 MWD+IFR-AK-CAZ-SC(5) 16,539.10 89.66 150.46 7,614.31 7,544.03 -7,517.70 10,604.00 5,958,100.61 359,681.29 0.99 12,934.66 MWD+IFR-AK-CAZ-SC(5) 16,634.15 89.53 151.51 7,614.98 7,544.70 -7,600.82 10,650.10 5,958,016.59 359,725.71 1.11 13,015.85 MWD+IFR-AK-CAZ-SC(5) 16,728.82 89.53 151.57 7,615.76 7,545.48 -7,684.05 10,695.21 5,957,932.48 359,769.14 0.06 13,096.23 MVVD+IFR-AK-CAZ-SC(5) 16,823.52 89.83 152.31 7,616.29 7,546.01 -7,767.61 10,739.76 5,957,848.04 359,812.00 0.84 13,176.29 MWD+IFR-AK-CAZ-SC(5) 16,918.44 89.59 153.72 7,616.77 7,546.49 -7,852.20 10,782.83 5,957,762.62 359,853.35 1.51 13,255.57 MWD+IFR-AK-CAZ-SC(5) 17,014.02 89.73 153.52 7,617.33 7,547.05 -7,937.82 10,825.30 5,957,676.16 359,894.09 0.26 13,334.84 MWD+IFR-AK-CAZ-SC(5) 17,109.42 89.42 154.28 7,618.04 7,547.76 -8,023.49 10,867.26 5,957,589.68 359,934.33 0.86 13,413.70 MWD+IFR-AK-CAZ-SC(5) 17,204.34 89.49 155.69 7,618.94 7,548.66 -8,109.50 10,907.40 5,957,502.88 359,972.72 1.49 13,491.13 MWD+IFR-AK-CAZ-SC(5) 17,299.71 89.42 155.32 7,619.85 7,549.57 -8,196.28 10,946.94 5,957,415.33 360,010.51 0.39 13,568.43 MWD+IFR-AK-CAZ-SC(5) 17,395.44 89.63 154.79 7,620.65 7,550.37 -8,283.08 10,987.31 5,957,327.75 360,049.13 0.60 13,646.46 MWD+IFR-AK-CAZ-SC(5) 17,490.52 89.70 154.71 7,621.20 7,550.92 -8,369.07 11,027.87 5,957,240.96 360,087.95 0.11 13,724.25 MWD+IFR-AK-CAZ-SC(5) 17,585.67 89.42 155.31 7,621.93 7,551.65 -8,455.31 11,068.06 5,957,153.94 360,126.40 0.70 13,801.85 MWD+IFR-AK-CAZ-SC(5) 17,680.69 89.46 154.71 7,622.86 7,552.58 -8,541.43 11,108.20 5,957,067.04 360,164.80 0.63 13,879.34 MWD+IFR-AK-CAZ-SC(5) 17,775.95 89.97 153.12 7,623.33 7,553.05 -8,626.99 11,150.09 5,956,980.67 360,204.96 1.75 13,958.07 MWD+IFR-AK-CAZ-SC(5) 17,871.22 89.66 152.81 7,623.64 7,553.36 -8,711.85 11,193.39 5,956,894.96 360,246.54 0.46 14,037.69 MWD+IFR-AK-CAZ-SC(5) 17,966.20 89.73 151.63 7,624.15 7,553.87 -8,795.88 11,237.66 5,956,810.07 360,289.11 1.24 14,117.73 MWD+IFR-AK-CAZ-SC(5) 18,061.50 89.70 150.43 7,624.62 7,554.34 -8,879.25 11,283.82 5,956,725.79 360,333.58 1.26 14,199.09 MWD+IFR-AK-CAZ-SC(5) 18,156.90 89.77 148.92 7,625.06 7,554.78 -8,961.59 11,331.98 5,956,642.50 360,380.08 1.58 14,281.69 MWD+IFR-AK-CAZ-SC(5) 18,251.61 89.56 147.97 7,625.62 7,555.34 -9,042.30 11,381.54 5,956,560.83 360,428.01 1.03 14,364.69 MWD+IFR-AK-CAZ-SC(5) 18,347.36 89.42 148.49 7,626.47 7,556.19 -9,123.70 11,431.95 5,956,478.44 360,476.77 0.56 14,448.77 MWD+IFR-AK-CAZ-SC(5) 18,442.64 89.28 149.79 7,627.55 7,557.27 -9,205.48 11,480.82 5,956,395.69 360,523.99 1.37 14,531.71 MWD+IFR-AK-CAZ-SC(5) 18,538.38 89.87 149.54 7,628.26 7,557.98 -9,288.11 11,529.18 5,956,312.12 360,570.67 0.67 14,614.61 MWD+IFR-AK-CAZ-SC(5) 18,634.14 89.90 150.67 7,628.45 7,558.17 -9,371.13 11,576.90 5,956,228.16 360,616.71 1.18 14,697.16 MWD+IFR-AK-CAZ-SC(5) 18,728.69 89.66 152.32 7,628.82 7,558.54 -9,454.21 11,622.02 5,956,144.20 360,660.15 1.76 14,777.48 MWD+IFR-AK-CAZ-SC(5) 18,824.48 90.04 152.91 7,629.07 7,558.79 -9,539.26 11,666.08 5,956,058.28 360,702.49 0.73 14,857.85 MWD+IFR-AK-CAZ-SC(5) 18,920.06 89.94 153.04 7,629.08 7,558.80 -9,624.41 11,709.51 5,955,972.29 360,744.20 0.17 14,937.72 MWD+IFR-AK-CAZ-SC(5) 19,015.38 89.94 155.22 7,629.18 7,558.90 -9,710.17 11,751.10 5,955,885.72 360,784.06 2.29 15,016.29 MWD+IFR-AK-CAZ-SC(5) 7.03 11 790.00 5 955 798.09 360 821.20 1.39 15,093.08 MWD+IFR-AK-CAZ-SC 5 19,110.56 89.77 156.53 7,629.42 7,559.14 -9,79 ( ) 19,205.89 90.08 156.20 7,629.55 7,559.27 -9,88437 11,828.22 5,955,710.02 360,857.66 0.47 15,169.50 MVVD+IFR-AK-CAZ-SC(5) 19,300.98 90.08 156.34 7,629.42 7,559.14 -9,971.42 11,866.49 5,955,622.22 360,894.17 0.15 15,245.82 MW13+IFR-AK-CAZ-SC(5) 19,396.02 90.14 158.16 7,629.23 7,558.95 -10,059.06 11,903.24 5,955,533.87 360,929.15 1.92 15,321.12 MWD+IFR-AK-CAZ-SC(5) 6/23/2017 9:23:57AM Page 7 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi ' TND TVDS$ • +W-S +El-W Northing Ea sting DLS Section (usft) (°) (°) (usft) (usft) ,1uS t) (usft) (ft) „ (ft) (°l100') (ft) Survey Tool Name 19,491.43 90.32 156.18 7,628.85 7,558.57 -10,146.99 11,940.26 5,955,445.22 360,964.39 2.08 15,396.80 MVVD+1FR-AK-CAZ-SC(5) 19,586.58 90.93 154.42 7,627.81 7,557.53 -10,233.43 11,980.01 5,955,358.01 361,002.40 1.96 15,474.11 MWD+IFR-AK-CAZ-SC(5) 19,680.92 91.00 153.87 7,626.22 7,555.94 -10,318.31 12,021.15 5,955,272.32 361,041.82 0.59 15,551.86 MVVD+IFR-AK-CAZ-SC(5) 19,777.36 90.13 153.78 7,625.27 7,554.99 -10,404.86 12,063.69 5,955,184.95 361,082.61 0.91 15,631.64 MWD+IFR-AK-CAZ-SC(5) 19,872.23 90.35 152.78 7,624.88 7,554.60 -10,489.59 12,106.34 5,955,099.37 361,123.55 1.08 15,710.64 MWD+IFR-AK-CAZ-SC(5) 19,967.07 90.52 151.71 7,624.16 7,553.88 -10,573.52 12,150.51 5,955,014.59 361,166.02 1.14 15,790.54 MWD+IFR-AK-CAZ-SC(5) 20,062.15 90.01 151.57 7,623.72 7,553.44 -10,657.19 12,195.67 5,954,930.04 361,209.49 0.56 15,871.19 MWD+IFR-AK-CAZ-SC(5) 20,157.10 90.02 149.90 7,623.69 7,553.41 -10,740.01 12,242.08 5,954,846.30 361,254.23 1.76 15,952.50 MWD+IFR-AK-CAZ-SC(5) 20,252.26 88.70 150.47 7,624.75 7,554.47 -10,822.57 12,289.39 5,954,762.81 361,299.87 1.51 16,034.46 MWD+IFR-AK-CAZ-SC(5) 20,347.63 86.72 151.35 7,628.56 7,558.28 -10,905.84 12,335.72 5,954,678.64 361,344.51 2.27 16,115.92 MWD+IFR-AK-CAZ-SC(5) 20,443.91 86.95 150.81 7,633.88 7,563.60 -10,989.98 12,382.21 5,954,593.58 361,389.29 0.61 16,197.95 MWD+IFR-AK-CAZ-SC(5) 20,538.71 87.09 149.44 7,638.81 7,568.53 -11,072.07 12,429.37 5,954,510.57 361,434.79 1.45 16,279.55 MWD+IFR-AK-CAZ-SC(5) 20,634.16 86.92 148.96 7,643.80 7,573.52 -11,153.95 12,478.17 5,954,427.74 361,481.94 0.53 16,362.47 MWD+IFR-AK-CAZ-SC(5) 20,730.29 87.19 146.33 7,648.74 7,578.46 -11,235.04 12,529.55 5,954,345.64 361,531.67 2.75 16,447.24 MWD+IFR-AK-CAZ-SC(5) 20,824.53 87.23 147.27 7,653.32 7,583.04 -11,313.80 12,581.09 5,954,265.86 361,581.62 1.00 16,531.00 MWD+IFR-AK-CAZ-SC(5) 20,877.83 87.19 147.93 7,655.92 7,585.64 -11,358.75 12,609.61 5,954,220.35 361,609.23 1.24 16,578.03 MWD+IFR-AK-CAZ-SC(5) 20,919.40 87.19 148.02 7,657.96 7,587.68 -11,393.95 12,631.63 5,954,184.72 361,630.53 0.22 16,614.58 MWD+IFR-AK-CAZ-SC(5) 20,963.25 87.26 148.49 7,660.08 7,589.80 -11,431.20 12,654.67 5,954,147.02 361,652.82 1.08 16,653.03 MWD+IFR-AK-CAZ-SC(5) 21,015.41 87.30 149.66 7,662.55 7,592.27 -11,475.89 12,681.45 5,954,101.80 361,678.70 2.24 16,698.41 MWD+IFR-AK-CAZ-SC(5) -11 518.65 12 707.04 5 954 058.54 361 703.42 2.25 21,065.30 87.23 148.54 7,664.93 7,594.65 16,741.81 MWD+IFR-AK-CAZ-SC(5) 21,111.05 87.23 148.45 7,667.15 7,596.87 -11,557.61 12,730.92 5,954,019.11 361,726.51 0.20 16,781.84 MWD+IFR-AK-CAZ-SC(5) 21,158.50 87.21 149.21 7,669.45 7,599.17 -11,598.16 12,755.45 5,953,978.08 361,750.22 1.60 16,823.22 MWD+IFR-AK-CAZ-SC(5) 21,166.00 87.35 149.08 7,669.80 7,599.52 -11,604.59 12,759.29 5,953,971 57 361,753.93 2.55 16,829.74 MWD+IFR-AK-CAZ-SC(5) 4112"x6314 21,206.22 88.12 148.40 7,671.39 7,601.11 -11,638.95 12,780.15 5,953,936.81 361,774.09 2.55 16,864.86 MWD+IFR-AK-CAZ-SC(5) 21,255.42 88.84 148.92 7,672.70 7,602.42 -11,680.96 12,805.73 5,953,894.30 361,798.82 1.80 16,907.87 MWD+IFR-AK-CAZ-SC(5) 21,301.24 89.18 148.81 7,673.49 7,603.21 -11,720.17 12,829.41 5,953,854.62 361,821.71 0.78 16,947.86 MWD+IFR-AK-CAZ-SC(5) 21,349.46 89.66 150.29 7,673.98 7,603.70 -11,761.73 12,853.85 5,953,812.58 361,845.31 3.23 16,989.66 MWD+IFR-AK-CAZ-SC(5) 21,396.35 89.80 150.12 7,674.20 7,603.92 -11,802.43 12,877.15 5,953,771.43 361,867.78 0.47 17,030.04 MWD+IFR-AK-CAZ-SC(5) 21,443.09 89.92 151.41 7,674.31 7,604.03 -11,843.21 12,899.98 5,953,730.20 361,889.79 2.77 17,070.06 MWD+IFR-AK-CAZ-SC(5) 21,491.42 90.71 152.40 7,674.05 7,603.77 -11,885.84 12,922.74 5,953,687.12 361,911.68 2.62 17,110.93 MWD+IFR-AK-CAZ-SC(5) 21,532.54 90.45 153.58 7,673.63 7,603.35 -11,922.48 12,941.41 5,953,650.12 361,929.62 2.94 17,145.28 MWD+IFR-AK-CAZ-SC,(5) 21,586.14 90.42 152.66 7,673.22 7,602.94 -11,970.28 12,965.64 5,953,601.84 361,952.88 1.72 17,189.99 MWD+IFR-AK-CAZ-SC(5) 21,682.11 90.49 152.35 7,672.46 7,602.18 -12,055.41 13,009.95 5,953,515.85 361,995.47 0.33 17,270.61 MWD+1FR-AK-CAZ-SC(5) 21,777.09 90.66 151.23 7,671.51 7,601.23 -12,139.10 13,054.84 5,953,431.27 362,038.67 1.19 17,351.04 MWD+1FR-AK-CAZ-SC(5) 21,871.36 90.45 153.47 7,670.59 7,600.31 -12,222.60 13,098.58 5,953,346.92 362,080.72 2.39 17,430.36 MWD+IFR-AK-CAZ-SC(5) 21,966.69 90.69 152.55 7,669.64 7,599.36 -12,307.54 13,141.85 5,953,261.14 362,122.27 1.00 17,509.98 MWD+IFR-AK-CAZ-SC(5) 22,061.58 89.94 153.43 7,669.12 7,598.84 -12,392.08 13,184.94 5,953,175.76 362,163.65 1.22 17,589.26 MWD+IFR-AK-CAZ-SC(5) 22,156.80 89.49 153.00 7,669.60 7,599.32 -12,477.08 13,227.85 5,953,089.92 362,204.84 0.65 17,668.60 MWD+IFR-AK-CAZ-SC(5) 22,251.84 89.15 152.74 7,670.72 7,600.44 -12,561.66 13,271.18 5,953,004.49 362,246.47 0.45 17,748.11 MWD+IFR-AK-CAZ-SC(5) 6/232017 9:23:57AM Page 8 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Wen; CD5-17 North Reference: True Wellborn: CD5-17 Survey Calculation Method: Minimum Curvature Design;, „ CD5-17 Database: OAKEDMP2 Sum! Map Map Vertical'. MD Inc Azi TVD TVDSS +N/-S +El-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) .4u) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 22,347.46 88.69 152.67 7,672.53 7,602.25 -12,646.62 13,315.02 5,952,918.68 362,288.59 0.49 17,828.24 MWD+IFR-AK-CAZ-SC(5) 74 7 604.18 -12 731.21 13,358.39 5 952 833.24 362,330 .24 0.50 17 907.78 MWD+IFR-AK-CAZ-SC 5 22,442.54 88.98 153.05 7,6 .46 ( ) 22,537.71 89.18 152.48 7,675.99 7,605.71 -12,815.82 13,401.94 5,952,747.78 362,372.08 0.63 17,987.49 MWD+IFR-AK-CAZ-SC(5) 22,633.37 88.60 152.84 7,677.84 7,607.56 -12,900.78 13,445.86 5,952,661 96 362,414.29 0.71 18,067.69 MWD+IFR-AK-CAZ-SC(5) 22,728.34 88.26 153.02 7,680.44 7,610.16 -12,985.31 13,489.06 5,952,576.58 362,455.78 0.41 18,147.06 MWD+IFR-AK-CAZ-SC(5) 22,823.57 88.25 154.59 7,683.34 7,613.06 -13,070.72 13,531.08 5,952,490.36 362,496.07 1.65 18,225.83 MWD+IFR-AK-CAZ-SC(5) 22,918.53 89.15 154.70 7,685.50 7,615.22 -13,156.51 13,571.73 5,952,403.77 362,534.99 0.95 18,303.61 MWD+IFR-AK-CAZ-SC(5) 23,013.05 89.80 153.92 7,686.36 7,616.08 -13,241.68 13,612.71 5,952,317.80 362,574.24 1.07 18,381.35 MWD+IFR-AK-CAZ-SC(5) 23,108.26 89.70 153.34 7,686.78 7,616.50 -13,326.98 13,654.99 5,952,231.68 362,614.80 0.62 18,460.31 MWD+IFR-AK-CAZ-SC(5) 23,203.78 89.70 154.18 7,687.28 7,617.00 -13,412.66 13,697.22 5,952,145.18 362,655.30 0.88 18,539.40 MWD+IFR-AK-CAZ-SC(5) 23,299.09 89.59 153.20 7,687.87 7,617.59 -13,498.09 13,739.47 5,952,058.92 362,695.82 1.03 18,618.38 MWD+IFR-AK-CAZ-SC(5) 23,395.24 89.73 152.52 7,688.44 7,618.16 -13,583.65 13,783.33 5,951,972.50 362,737.95 0.72 18,698.83 MVVD+IFR-AK-CAZ-SC(5) 23,488.94 89.80 153.75 7,688.83 7,618.55 -13,667.24 13,825.67 5,951,888.09 362,778.60 1.31 18,776.98 MWD+IFR-AK-CAZ-SC(5) 23,584.64 89.70 154.35 7,689.24 7,618.96 -13,753.29 13,867.54 5,951,801.22 362,818.74 0.64 18,855.94 MWD+IFR-AK-CAZ-SC(5) 23,679.33 89.83 155.18 7,689.63 7,619.35 -13,838.94 13,907.91 5,951,714.78 362,857.37 0.89 18,933.40 MWD+IFR-AK-CAZ-SC(5) 23,774.35 89.73 154.63 7,690.00 7,619.72 -13,924.99 13,948.21 5,951,627.95 362,895.94 0.59 19,011.00 MWD+IFR-AK-CAZ-SC(5) 23,869.77 89.10 153.80 7,690.97 7,620.69 -14,010.90 13,989.72 5,951,541.22 362,935.70 1.09 19,089.58 MWD+IFR-AK-CAZ-SC(5) 23,964.07 89.80 155.15 7,691.88 7,621.60 -14,095.99 14,030.35 5,951,455.34 362,974.62 1.61 19,166.98 MWD+IFR-AK-CAZ-SC(5) 24,061.01 89.87 153.32 7,692.15 7,621.87 -14,183.29 14,072.48 5,951,367.22 363,014.99 1.89 19,246.79 MWD+IFR-AK-CAZ-SC(5) 24,155.80 90.38 153.72 7,691.95 7,621.67 -14,268.13 14,114.75 5,951,281.55 363,055.54 0.68 19,325.50 M1ND+IFR-AK-CAZ-SC(5) 24,251.86 90.36 152.87 7,691.33 7,621.05 -14,353.94 14,157.92 5,951,194.90 363,096.97 0.89 19,405.47 MWD+IFR-AK-CAZ-SC(5) 24,346.04 91.91 153.03 7,689.46 7,619.18 -14,437.80 14,200.74 5,951,110.20 363,138.09 1.65 19,484.18 MWD+IFR-AK-CAZ-SC(5) 24,441.81 91.73 152.08 7,686.42 7,616.14 -14,522.75 14,244.85 5,951,024.39 363,180.49 1.01 19,564.54 MWD+IFR-AK-CAZ-SC(5) 24,537.42 90.32 151.32 7,684.71 7,614.43 -14,606.92 14,290.17 5,950,939.34 363,224.11 1.68 19,645.57 MWD+IFR-AK-CAZ-SC(5) 24,633.14 88.74 151.78 7,685.50 7,615.22 -14,691.07 14,335.77 5,950,854.29 363,268.01 1.72 19,726.83 MWD+IFR-AK-CAZ-SC(5) 24,728.33 89.61 150.56 7,686.87 7,616.59 -14,774.45 14,381.67 5,950,770.01 363,312.21 1.57 19,807.97 MWD+IFR-AK-CAZ-SC(5) 24,823.64 88.26 150.08 7,688.64 7,618.36 -14,857.24 14,428.85 5,950,686.30 363,357.72 1.50 19,889.94 MWD+IFR-AK-CAZ-SC(5) 24,918.83 87.35 150.20 7,692.28 7,622.00 -14,939.73 14,476.21 5,950,602.88 363,403.41 0.96 19,971.91 MWD IFR-AK-CAZ-SC(5) 25,014.62 87.32 149.37 7,696.74 7,626.46 -15,022.42 14,524.36 5,950,519.25 363,449.89 0.87 20,054.66 MWD+IFR-AK-CAZ-SC(5) 25,109.55 88.39 150.26 7,700.29 7,630.01 -15,104.42 14,572.06 5,950,436.32 363,495.93 1.47 20,136.68 MWD+IFR-AK-CAZ-SC(5) 25,205.31 88.87 152.20 7,702.58 7,632.30 -15,188.33 14,618.13 5,950,351.50 363,540.30 2.09 20,218.24 MWD+IFR-AK-CAZ-SC(5) 25,300.68 89.39 151.60 7,704.03 7,633.75 -15,272.45 14,663.05 5,950,266.51 363,583.52 0.83 20,298.89 MWD+IFR-AK-CAZ-SC(5) 25,395.98 89.32 150.87 7,705.10 7,634.82 -15,355.98 14,708.90 5,950,182.07 363,627.68 0.77 20,380.07 MWD+IFR-AK-CAZ-SC(5) 25,491.25 88.65 150.43 7,706.79 7,636.51 -15,439.01 14,755.59 5,950,098.13 363,672.69 0.84 20,461.72 MWD+IFR-AK-CAZ-SC(5) 25,585.52 89.59 151.82 7,708.24 7,637.96 -15,521.55 14,801.11 5,950,014.70 363,716.54 1.78 20,542.11 MWD+IFR-AK-CAZ-SC(5) 25,681.54 89.77 151.03 7,708.77 7,638.49 -15,605.87 14,847.03 5,949,929.48 363,760.76 0.84 20,623.75 MWD+IFR-AK-CAZ-SC(5) 25,777.03 89.46 151.84 7,709.41 7,639.13 -15,689.73 14,892.69 5,949,844.73 363,804.72 0.91 20,704.92 MWD+IFR-AK-CAZ-SC(5) 25,873.49 89.29 149.53 7,710.47 7,640.19 -15,773.83 14,939.91 5,949,759.70 363,850.24 2.40 20,787.56 MWD+IFR-AK-CAZ-SC(5) 25,967.29 88.45 149.88 7,712.32 7,642.04 -15,854.80 14,987.22 5,949,677.80 363,895.91 0.97 20,868.74 MWD+IFR-AK-CAZ-SC(5) 26,062.64 89.15 148.26 7,714.31 7,644.03 -15,936.57 15,036.22 5,949,595.07 363,943.25 1.85 20,951.77 MWD+IFR-AK-CAZ-SC(5) 6/23/2017 9:23 57AM Page 9 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True • Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CDS-17 Database: OAKEDMP2 Survey :f; y' " Map MapVertical MD Inc Azi TVD TVDSS +N/-S + !Yltp (r� fasting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) , (ft) (ft) (°/100') (ft) Survey Tool Name 26,157.64 89.77 148.27 7,715.21 7,644.93 -16,01736 15,086.18 5,949,513.30 363,991 58 0.65 21,035 17 MWD+IFR-AK-CAZ-SC(5) 26,252.63 89.77 147.74 7,715.59 7,645.31 -16,097.92 15,136.51 5,949,431.75 364,040.28 0.56 21,118.77 MWD+IFR-AK-CAZ-SC(5) 26,348.22 89.66 149.54 7,716.07 7,645.79 -16,179.55 15,186.26 5,949,349.15 364,088.37 1.89 21,202.38 MWD+IFR-AK-CAZ-SC(5) 26,442.73 89.70 149.36 7,716.59 7,646.31 -16,260.93 15,234.29 5,949,266.82 364,134.76 0.20 21,284.39 MWD+IFR-AK-CAZ-SC(5) 26,538.16 89.14 149.08 7,717.56 7,647.28 -16,342.92 15,283.13 5,949,183.88 364,181.93 0.66 21,367.39 MWD+IFR-AK-CAZ-SC(5) 26,633.78 89.56 149.49 7,718.64 7,648.36 -16,425.12 15,331.96 5,949,100.72 364,229.11 0.61 21,450.50 MVVD+IFR-AK-CAZ-SC(5) 26,728.55 89.73 149.67 7,719.23 7,648.95 -16,506.84 15,379.95 5,949,018.06 364,275.44 0.26 21,532.64 MWD+IFR-AK-CAZ-SC(5) 26,824.03 89.48 149.52 7,719.89 7,649.61 -16,589.19 15,428.27 5,948,934.76 364,322.09 0.31 21,615.37 MWD+IFR-AK-CAZ-SC(5) 26,919.11 90.25 150.58 7,720.11 7,649.83 -16,671.57 15,475.74 5,948,851.45 364,367.89 1.38 21,697.38 MWD+IFR-AK-CAZ-SC(5) 27,013.22 91.04 149.85 7,719.05 7,648.77 -16,753.24 15,522.48 5,948,768.87 364,412.98 1.14 21,778.41 MWD+IFR-AK-CAZ-SC(5) 27,109.37 92.42 150.75 7,716.15 7,645.87 -16,836.72 15,570.10 5,948,684.46 364,458.91 1.71 21,861.09 MVVD+IFR-AK-CAZ-SC(5) 27,204.71 92.41 150.88 7,712.13 7,641.85 -16,919.88 15,616.55 5,948,600.38 364,503.68 0.14 21,942.61 MWD+IFR-AK-CAZ-SC(5) 27,299.78 92.34 152.81 7,708.19 7,637.91 -17,003.62 15,661.37 5,948,515.76 364,546.80 2.03 22,022.99 MWD+IFR-AK-CAZ-SC(5) 27,395.24 92.44 154.52 7,704.21 7,633.93 -17,089.10 15,703.67 5,948,429.46 364,587.38 1.79 22,102.05 MWD+IFR-AK-CAZ-SC(5) 27,490.67 92.51 155.65 7,700.09 7,629.81 -17,175.57 15,743.84 5,948,342.21 364,625.80 1.19 22,179.73 MWD+IFR-AK-CAZ-SC(5) 27,586.41 92.48 156.00 7,695.92 7,625.64 -17,262.83 15,783.01 5,948,254.19 364,663.21 0.37 22,256.95 MWD+IFR-AK-CAZ-SC(5) 27,681.79 92.51 155.14 7,691.77 7,621.49 -17,349.58 15,822.42 5,948,166.66 364,700.87 0.90 22,334.12 MWD+IFR-AK-CAZ-SC(5) 27,777.00 92.32 155.13 7,687.76 7,617.48 -17,435.89 15,862.42 5,948,079.58 364,739.12 0.20 22,411.58 MWD+IFR-AK-CAZ-SC(5) 27,871.79 93.41 153.99 7,683.02 7,612.74 -17,521.38 15,903.08 5,947,993.29 364,778.06 1.66 22,489.22 MWD+IFR-AK-CAZ-SC(5) 27,966.73 93.09 152.61 7,677.64 7,607.36 -17,606.06 15,945.67 5,947,907.79 364,818.93 1.49 22,568.12 MVVD+IFR-AK-CAZ-SC(5) 28,062.35 92.46 152.20 7,673.01 7,602.73 -17,690.70 15,989.91 5,947,822.28 364,861.46 0.79 22,648.45 MWD+IFR-AK-CAZ-SC(5) 28,158.67 92.99 151.07 7,668.43 7,598.15 -17,775.36 16,035.62 5,947,736.72 364,905.46 1.29 22,730.06 MWD+IFR-AK-CAZ-SC(5) 28,252.86 92.96 151.30 7,663.54 7,593.26 -17,857.78 16,080.96 5,947,653.42 364,949.13 0.25 22,810.23 MWD+IFR-AK-CAZ-SC(5) 28,348.09 93.54 151.61 7,658.14 7,587.86 -17,941.29 16,126.39 5,947,569.01 364,992.87 0.69 22,891.04 MWD+IFR-AK-CAZ-SC(5) 28,443.09 93.47 152.32 7,652.34 7,582.06 -18,024.99 16,170.96 5,947,484.45 365,035.75 0.75 22,971.18 MWD+IFR-AK-CAZ-SC(5) 28,537.72 93.64 150.30 7,646.47 7,576.19 -18,107.84 16,216.30 5,947,400.71 365,079.41 2.14 23,051.57 MWD+IFR-AK-CAZ-SC(5) 28,585.18 93.51 151.37 7,643.51 7,573.23 -18,149.20 16,239.38 5,947,358.90 365,101.66 2.27 23,092.09 MWD+IFR-AK-CAZ-SC(5) 28,645.00 93.51 151.37 7,639.85 7,569.57 -18,201.61 16,267.99 5,947,305.93 365,129.20 0.00 23,142.88 PROJECTED to TD • 6/23/2017 9'23'57AM Page 10 COMPASS 5000.1 Build 74 • Dindrens Cement Detail Report ` &Mai CD5-17 corK) cd hiliipi String: Surface Casing Cement Job: DRILLING ORIGINAL,4/23/2017 08:00 Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Surface Casing Cement 4/28/2017 03:30 4/28/2017 06:00 CD5-17 Comment Pumped 75 bbl 11 ppg MudPushll,302 bbl 11 ppg Lead cement,60.8 bbl 15.8 ppg tail cement.Bumped plugs and floats held. No losses. Cement Stages Stage#1 Description Objective Top Depth(ftKB) Bottom Depth(ftKB) Full Return? Vol Cement...Top Plug? Btm Plug? Surface Casing Cement Cement to surface 36.6 2,232.0 Yes 110.0 Yes Yes Q Pump[nit(bbl/m...Q Pump Final(bbl/...Q Pump Avg(bbl/... P Pump Final(psi) P Plug Bump(psi) Recip? Stroke(ft) Rotated? Pipe RPM(rpm) 5 3 7 540.0 1,030.0 No No Tagged Depth(ftKB) Tag Method Depth Plug Drilled Out To(ftKB) Drill Out Diameter(in) Comment Pumped 75 bbl 11 ppg MudPushll,302 bbl 11 ppg Lead cement,60.8 bbl 15.8 ppg tail cement. Bumped plugs and floats held. 110 bbl 11 ppg lead to surface. No losses. Cement Fluids&Additive3' Fluid Fluid Type Fluid Description Estimated Top(ftKB) Est Btm(ftKB) Amount(sacks) Class Volume Pumped(bbl) Surface Cement 36.6 1,732.0 1,001 G 302.0 Yield(W/sack) Mix H2O Ratio(gal/sa... Free Water(%) Density(lb/gal) Plastic Viscosity(Pa•s) Thickening Time(hr) CmprStr 1(psi) 1.91 6.76 11.00 252.0 . 4.75 Additives Additive Type Concentration Conc Unit label Antifoam D046 0.2 %BWOC Additive Type Concentration Conc Unit label Fluid Loss Control D167 0.5 %BWOC Additive Type Concentration Conc Unit label Dispersant D185 0.06 gal/sx Fluid Fluid Type Fluid Description Estimated Top(ftKB) Est Btm(ftKB) Amount(sacks) Class Volume Pumped(bbl) Tail Cement 1,732.0 2,232.0 290 G 60.8 Yield(W/sack) Mix H2O Ratio(gal/sa... Free Water(%) 'Density(lb/gal) Plastic Viscosity(Pa-s) Thickening Time(hr) CmprStr 1(psi) 1.16 5.09 15.80 143.0 4.25 Additives Additive Type Concentration Conc Unit label Antifoam D046 0.2 %BWOC Additive Type Concentration Conc Unit label Dispersant D065 0.3 %BWOC Additive Type Concentration Conc Unit label Fluid Loss Control D167 0.4 %BWOC Page 1/1 Report Printed: 7/10/2017 Cement Detail Report , • • I' ,... . .,:, CD5-17 1 onaco, . _ . , _ fthillips S s,ke, String: Intermediate CasingCement 9 Job: DRILLING ORIGINAL,4/23/2017 08:00 Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Intermediate Casing Cement 5/11/2017 20:40 5/12/2017 03:50 CD5-17 Comment Pumped 40 bbl of MPII,dropped bottom dart,and pumped 184.3 bbl of 15.8 ppg cement. Dropped top dart and displaced. Bumped dart and floats held. Pressured up and opened stage tool. Pumped 40 bbl of MPII and 48 bbl of 15.8 ppg cmt. Dropped closing plug and bumped. Shifted the stage tool closed and checked at surface. Cement Stages Stage#1 Description Objective Top Depth(ftKB) Bottom Depth(ftKB) Full Return? Vol Cement...Top Plug? Btm Plug? Intermediate Casing Cement intermediate, 13,300.0 15,830.0 Yes Yes Yes Cement 500'above Kup C Q Pump Init(bbl/m...Q Pump Final(bbl/... Q Pump Avg(bbl/... P Pump Final(psi) P Plug Bump(psi) Recip? Stroke(ft) Rotated? Pipe RPM(rpm) 4 8 7 700.0 1,200.0 No No Tagged Depth(ftKB) Tag Method Depth Plug Drilled Out To(ftKB) Drill Out Diameter(in) Drill Bit 6 3/4 Comment Cement Fluids&Additives Fluid Fluid Type Fluid Description Estimated Top(ftKB) Est Btm(ftKB) Amount(sacks) Class Volume Pumped(bbl) Intermediate Cement 13,300.0 15,830.0 888 G 184.0 Yield(ft'/sack) Mix H2O Ratio(gal/sa... Free Water(%) Density(lb/gal) Plastic Viscosity(Pa•s) Thickening Time(hr) CmprStr 1(psi) 1.16 5.09 15.80 105.0 6.25 Additives Additive Type Concentration Conc Unit label D046 AntiFoam 0.2 %BWOC Additive Type Concentration Conc Unit label D065 Dispersant 0.3 %BWOC Additive Type Concentration Conc Unit label D167 Fluid Loss 0.4 %BWOC Additive Type Concentration Conc Unit label D177 Retarder 0.03 gal/sx Stage#2 Description Objective Top Depth(ftKB) Bottom Depth(ftKB) Full Return? Vol Cement...Top Plug? Btm Plug? Intermediate Casing Isolate Qannik,500' 5,265.0 5,929.0 Yes Yes No Cement above Q Pump Init(bbl/m...Q Pump Final(bbl/...Q Pump Avg(bbl/... P Pump Final(psi) P Plug Bump(psi) Recip? Stroke(ft) Rotated? Pipe RPM(rpm) 3 8 7 400.0 2,000.0 No No Tagged Depth(ftKB) Tag Method Depth Plug Drilled Out To(ftKB) Drill Out Diameter(in) Drill Bit 6 3/4 Comment Cement Fluids&Additives Fluid Fluid Type Fluid Description Estimated Top(ftKB) Est Btm(ftKB) Amount(sacks) Class Volume Pumped(bbl) Intermediate Cement 5,265.0 5,929.0 237 G 48.0 Yield(ft'/sack) Mix H2O Ratio(gal/sa... Free Water(%) Density(lb/gal) Plastic Viscosity(Pa-s) Thickening Time(hr) CmprStr 1(psi) 1.16 5.09 15.80 124.0 4.91 Additives Additive Type Concentration Conc Unit label D046 AntiFoam 0.2 %BWOC Additive Type Concentration Conc Unit label D065 Dispersant 0.3 %BWOC Additive Type Concentration Conc Unit label D167 Fluid Loss 0.4 %BWOC Additive Type Concentration Conc Unit label D177 Retarder 0.01 gal/sx Page 1/1 Report Printed: 7/10/2017 21 7017 • • 28326 RECEIVED S CI1IUI'IlberJUN 2 9 2017 Transmittal#: 29JUN17-SPO1 AOG Drilling & Measurement?; C DATA LOGGEL' Product Delivery '{ i $%2ot'7 M.K.BENDER Customer: ConocoPhillips Alaska Dispatched To: AOGCC: Makana Bender Well Name: CD5-17 Date Dispatched: 29-Jun-17 Service Order#: 16AKA0117 Dispatched By: Stephanie Pacillo Product Description Hardcopy Digital Copy Logging Date Color Log Prints: 4 Contents on CD 21-May-17 Scope Resistivity 2" MD x x 2"TVD x x 5" MD x x 5"TVD x x Digital Data N/A Contents on CD LAS/DLIS Data x Surveys 2 Contents on CD Nad27 x x Nad83 x x CD 1 Contents on CD Data: DLIS/LAS x Graphics: PDF x Surveys: PDF/TXT x Please sign and email a copy to: Please sign and email a copy to: Tom.Osterkamp(a�conocophillips.com AlaskaPTSPrintCenter c(Dslb.com Attn:Tom Osterkamp Attn:Stephanie Pacillo Received By: MALC447-/X-4) ,X�gtg • 21 7017 28326 RECEIVED JUN 292017 FINAL , AOGCC NADConversion Western North Slope CD5 Alpine West Pad CD5-17 CD5-17 NAD 27 Definitive Survey Report 23 June, 2017 • • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Project Western North Slope,North Slope Alaska,United States Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well CD5-17 Well Position +N/-S 0.00 usft Northing: 5,965,829.15 usft Latitude: 70°18'49.454 N +E/-W 0.00 usft Easting: 349,231.16 usft Longitude: 151°13'19.003 W Position Uncertainty 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 34.00 usft Wellbore CD5-17 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2016 5/1/2017 17.18 80.81 57,504 I Design CD5-17 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 36.28 Vertical Section: Depth From(TVD) +N/-S +EI-W Direction (usft) (usft) (usft) (°) 36.28 0.00 0.00 119.65 Survey Program Date From To (usft) (usft) Survey(Wellbore) Tool Name Description Survey Date 75.00 724.00 CD5-17 Srvy 1-SLB_NSG+SShot(CD5 GYD-GC-SS Gyrodata gyro single shots 4/26/2017 1:49: 752.26 2,158.50 CD5-17 Srvy 2-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 4/26/2017 2:02: 2,258.39 12,610.16 CD5-17 Srvy 3-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 4/29/2017 8:02: 12,710.15 15,781.33 CD5-17 Srvy 4-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/4/2017 9:35:0 15,875.88 28,585.18 CD5-17 Srvy 5-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/14/2017 1:31: Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 75.00 0.30 225.88 75.00 4.72 -0.07 -0.07 5,965,829.08 349.231 09 0.77 -0.03 GYD-GC-SS(1) 174.00 0.23 163.07 174.00 103.72 -0.44 -0.20 5,965,828.71 349,230.95 0.29 0.04 GYD-GC-SS(1) 265.00 0.16 166.95 265.00 194.72 -0.74 -0.12 5,965,828.41 349,231.03 0.08 0.26 GYD-GC-SS(1) 357.00 0.46 311.15 357.00 286.72 -0.62 -0.37 5,965,828.54 349,230.78 0.65 -0.01 GYD-GC-SS(1) 449.00 0.92 340.56 448.99 378.71 0.32 -0.89 5,965,829.49 349,230.27 0.62 -0.93 GYD-GC-SS(1) 540.00 2.20 359.56 539.96 469.68 2.75 -1.15 5,965,831.93 349,230.07 1.50 -2.36 GYD-GC-SS(1) 637.00 3.21 4.98 636.85 566.57 7.32 -0.93 5,965,836.49 349,230.38 1.07 -4.43 GYD-GC-SS(1) 724.00 4.00 8.00 723.67 653.39 12.75 -0.29 5,965,841.91 349,231.12 0.93 -6.56 GYD-GC-SS(1) 752.26 3.90 7.31 751.87 681.59 14.68 -0.03 5,965,843.83 349,231.42 0.39 -7.29 MWD+IFR-AK-CAZ-SC(2) 846.03 3.83 42.96 845.44 775.16 20.14 2.51 5,965,849.23 349,234.07 2.52 -7.79 MWD+IFR-AK-CAZ-SC(2) 6/23/2017 9:23:57AM Page 2 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N1-S +E/-W Northing Easting DLS Section (usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) (0/100') (ft) Survey Tool Name 940.46 3.50 87.83 939.69 869.41 22.56 7.54 5,965,851.55 349,239.15 2.98 -4.61 MWD+IFR-AK-CAZ-SC(2) 1,033.37 5.09 109.77 1,032.34 962.06 21.27 14.25 5,965,850.13 349,245.83 2.43 1.86 MWD+IFR-AK-CAZ-SC(2) 1,127.46 7.31 115.82 1,125.88 1,055.60 17.25 23.57 5,965,845.92 349,255.07 2.46 11.95 MWD+IFR-AK-CAZ-SC(2) 1,221.27 8.37 123.44 1,218.81 1,148.53 10.89 34.64 5,965,839.34 349,266.01 1.58 24.72 MWD+IFR-AK-CAZ-SC(2) 1,315.61 9.72 126.32 1,311.98 1,241.70 2.39 46.79 5,965,830.60 349,277.98 1.51 39.48 MWD+IFR-AK-CAZ-SC(2) 1,409.83 11.35 130.09 1,404.61 1,334.33 -8.30 60.29 5,965,819.65 349,291.26 1.88 56.50 MWD+IFR-AK-CAZ-SC(2) 1,504.04 13.36 128.38 1,496.63 1,426.35 -21.03 75.91 5,965,806.61 349,306.63 2.17 76.37 MWD+IFR-AK-CAZ-SC(2) 1,598.23 14.58 123.99 1,588.04 1,517.76 -34.41 94.28 5,965,792.86 349,324.72 1.71 98.95 MWD+IFR-AK-CAZ-SC(2) 1,693.35 15.38 120.55 1,679.93 1,609.65 -47.52 115.07 5,965,779.34 349,345.24 1.26 123.50 MWD+IFR-AK-CAZ-SC(2) 1,787.28 15.98 120.65 1,770.36 1,700.08 -60.44 136.92 5,965,765.98 349,366.82 0.64 148.89 MWD+IFR-AK-CAZ-SC(2) 1,881.01 16.66 122.75 1,860.31 1,790.03 -74.29 159.32 5,965,751.69 349,388.94 0.96 175.20 MWD+IFR-AK-CAZ-SC(2) 1,974.87 17.59 127.09 1,950.01 1,879.73 -90.12 181.95 5,965,735.40 349,411.25 1.68 202.70 MWD+IFR-AK-CAZ-SC(2) 2,067.51 20.00 131.08 2,037.71 1,967.43 -108.97 205.06 5,965,716.09 349,433.97 2.95 232.12 MWD+IFR-AK-CAZ-SC(2) 2,158.50 22.62 131.70 2,122.47 2,052.19 -130.84 229.86 5,965,693.73 349,458.33 2.89 264.49 MWD+IFR-AK-CAZ-SC(2) 2.222.00 23.57 130.00 2,180.88 2,110.60 -147.13 248.70 5,965,677.07 349,476.84 1.83 288.92 NOT an Actual Survey 10 3/4"x 13-1/2" 2,258.39 24.13 129.08 2,214.17 2,143.89 -156.50 260.05 5,965,667.48 349,488.00 1.83 303.42 MWD+IFR-AK-CAZ-SC(3) 2,350.92 26.30 124.23 2,297.88 2,227.60 -179.95 291.69 5,965,643.39 349,519.16 3.24 ' 342.52 MWD+IFR-AK-CAZ-SC(3) 2,445.50 29.68 116.85 2,381.41 2,311.13 -202.33 329.93 5,965,620.25 349,556.93 5.11 386.82 MWD+IFR-AK-CAZ-SC(3) 2,539.25 32.95 112.44 2,461.51 2,391.23 -222.55 374.22 5,965,599.14 349,600.81 4.26 435.32 MWD+IFR-AK-CAZ-SC(3) 2,633.14 35.50 113.03 2,539.13 2,468.85 -242.97 422.92 5,965,577.76 349,649.08 2.74 487.74 MWD+IFR-AK-CAZ-SC(3) 2,728.03 38.47 114.03 2,614.92 2,544.64 -265.77 475.24 5,965,553.91 349,700.93 3.19 544.49 MWD+IFR-AK-CAZ-SC(3) 2,820.61 41.14 114.32 2,686.04 2,615.76 -290.04 529.30 5,965,528.56 349,754.49 2.89 603.48 MWD+IFR-AK-CAZ-SC(3) 2,913.65 44.15 114.56 2,754.47 2,684.19 -316.12 586.68 5,965,501.34 349,811.33 3.24 666.25 MWD+IFR-AK-CAZ-SC(3) 3,008.09 47.32 115.43 2,820.38 2,750.10 -344.71 647.96 5,965,471.53 349,872.02 3.42 733.64 MWD+IFR-AK-CAZ-SC(3) 3,103.13 50.50 117.13 2,882.83 2,812.55 -376.44 712.16 5,965,438.52 349,935.57 3.61 805.14 MWD+IFR-AK-CAZ-SC(3) 3,197.52 53.49 119.35 2,940.95 2,870.67 -411.65 777.66 5,965,402.00 350,000.34 3.67 879.47 MWD+IFR-AK-CAZ-SC(3) 3,291.64 56.93 120.82 2,994.65 2,924.37 -450.41 844.51 5,965,361.91 350,066.40 3.87 956.75 MWD+IFR-AK-CAZ-SC(3) 3,385.92 60.47 122.40 3,043.62 2,973.34 -492.64 913.10 5,965,318.31 350,134.11 4.02 1,037.25 MWD+IFR-AK-CAZ-SC(3) 3,480.20 63.08 122.55 3,088.21 3,017.93 -537.24 983.17 5,965,272.32 350,203.27 2.77 1,120.21 MWD+IFR-AK-CAZ-SC(3) 3,574.10 65.58 121.83 3,128.88 3,058.60 -582.32 1,054.79 5,965,225.82 350,273.97 2.75 1,204.75 MWD+IFR-AK-CAZ-SC(3) 3,668.21 65.48 121.84 3,167.86 3,097.58 -627.50 1,127.56 5,965,179.19 350,345.81 0.11 1,290.34 MWD+IFR-AK-CAZ-SC(3) 3,762.57 66.12 122.24 3,206.54 3,136.26 -673.16 1,200.52 5,965,132.07 350,417.83 0.78 1,376.34 MWD+IFR-AK-CAZ-SC(3) 3,857.38 66.13 123.47 3,244.92 3,174.64 -720.19 1,273.34 5,965,083.59 350,489.69 1.19 1,462.90 MWD+IFR-AK-CAZ-SC(3) 3,950.33 65.93 124.85 3,282.68 3,212.40 -767.88 1,343.62 5,965,034.50 350,559.00 1.37 1,547.57 MWD+IFR-AK-CAZ-SC(3) 4,044.30 65.98 124.50 3,320.97 3,250.69 -816.70 1,414.20 5,964,984.28 350,628.57 0.34 1,633.05 MWD+IFR-AK-CAZ-SC(3) 4,138.39 66.02 124.74 3,359.24 3,288.96 -865.54 1,484.93 5,964,934.04 350,698.31 0.24 1,718.68 MWD+IFR-AK-CAZ-SC(3) 4,233.64 65.21 124.56 3,398.56 3,328.28 -914.86 1,556.30 5,964,883.29 350,768.66 0.87 1,805.11 MWD+IFR-AK-CAZ-SC(3) 4,328.19 65.41 121.55 3,438.07 3,367.79 -961.71 1,628.29 5,964,835.01 350,839.69 2.90 1,890.85 MWD+IFR-AK-CAZ-SC(3) 4,421.96 65.25 120.68 3,477.20 3,406.92 -1,005.74 1,701.24 5,964,789.53 350,911.74 0.86 1,976.03 MWD+IFR-AK-CAZ-SC(3) 6/23/2017 9:23:57AM Page 3 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 4,515.82 65.45 118.69 3,516.35 3,446.07 -1,047.99 1,775.35 5,964,745.81 350,984.98 1.94 2,061.33 MWD+1FR-AK-CAZ-SC(3) 4,609.24 65.37 117.86 3,555.23 3,484.95 -1,088.23 1,850.16 5,964,704.08 351,058.96 0.81 2,146.25 MWD+IFR-AK-CAZ-SC(3) 4,704.90 65.47 117.80 3,595.02 3,524.74 -1,128.84 1,927.09 5,964,661.93 351,135.05 0.12 2,233.20 MWD+IFR-AK-CAZ-SC(3) 4,799.97 65.60 117.53 3,634.39 3,564.11 -1,169.01 2,003.73 5,964,620.23 351,210.87 0.29 2,319.68 MWD+IFR-AK-CAZ-SC(3) 4,892.17 65.18 118.84 3,672.79 3,602.51 -1,208.60 2,077.61 5,964,579.16 351,283.93 1.37 2,403.48 MWD+IFR-AK-CAZ-SC(3) 4,984.27 65.38 119.69 3,711.30 3,641.02 -1,249.50 2,150.60 5,964,536.81 351,356.07 0.87 2,487.14 MWD+1FR-AK-CAZ-SC(3) 5,078.77 65.73 119.40 3,750.41 3,680.13 -1,291.92 2,225.44 5,964,492.90 351,430.04 0.46 2,573.16 MWD+IFR-AK-CAZ-SC(3) 5,173.62 65.75 118.22 3,789.38 3,719.10 -1,333.59 2,301.21 5,964,449.72 351,504.96 1.13 2,659.63 MWD+IFR-AK-CAZ-SC(3) 5,266.91 66.24 117.73 3,827.34 3,757.06 -1,373.57 2,376.47 5,964,408.24 351,579.40 0.71 2,744.81 MWD+IFR-AK-CAZ-SC(3) 5,360.46 66.45 116.21 3,864.87 3,794.59 -1,412.43 2,452.84 5,964,367.86 351,654.96 1.51 2,830.40 MWD+IFR-AK-CAZ-SC(3) 5,454.61 66.54 116.02 3,902.42 3,832.14 -1,450.43 2,530.36 5,964,328.31 351,731.70 0.21 2,916.58 MWD+1FR-AK-CAZ-SC(3) 5,547.91 66.56 117.44 3,939.55 3,869.27 -1,488.93 2,606.81 5,964,288.29 351,807.35 1.40 3,002.06 MWD+1FR-AK-CAZ-SC(3) 5,642.49 66.44 118.33 3,977.27 3,906.99 -1,529.50 2,683.47 5,964,246.20 351,883.18 0.87 3,088.75 MWD+IFR-AK-CAZ-SC(3) 5,736.57 66.47 119.22 4,014.85 3,944.57 -1,571.01 2,759.07 5,964,203.17 351,957.92 0.87 3,174.98 MWD+IFR-AK-CAZ-SC(3) 5,827.97 66.50 119.49 4,051.32 3,981.04 -1,612.10 2,832.11 5,964,160.63 352,030.13 0.27 3,258.79 MWD+1FR-AK-CAZ-SC(3) 5,922.64 66.37 119.40 4,089.17 4,018.89 -1,654.76 2,907.68 5,964,116.47 352,104.81 0.16 3,345.57 MWD+IFR-AK-CAZ-SC(3) 6,016.58 66.57 120.46 4,126.67 4,056.39 -1,697.73 2,982.32 5,964,072.01 352,178.57 1.06 3,431.69 MWD+IFR-AK-CAZ-SC(3) 6,111.44 66.40 121.50 4,164.52 4,094.24 -1,742.50 3,056.89 5,964,025.75 352,252.23 1.02 3,518.65 MWD+IFR-AK-CAZ-SC(3) 6,206.13 66.64 121.41 4,202.25 4,131.97 -1,787.82 3,130.98 5,963,978.96 352,325.38 0.27 3,605.46 MWD+IFR-AK-CAZ-SC(3) 6,299.83 66.39 121.85 4,239.59 4,169.31 -1,832.89 3,204.15 5,963,932.43 352,397.63 0.51 3,691.35 MWD+1FR-AK-CAZ-SC(3) 6,394.66 65.76 121.49 4,278.04 4,207.76 -1,878.40 3,277.93 5,963,885.45 352,470.47 0.75 3,777.97 MWD+1FR-AK-CAZ-SC(3) 6,488.51 65.43 120.38 4,316.82 4,246.54 -1,922.33 3,351.23 5,963,840.06 352,542.87 1.13 3,863.41 MWD+IFR-AK-CAZ-SC(3) 6,582.69 65.40 119.99 4,356.00 4,285.72 -1,965.39 3,425.26 5,963,795.53 352,616.01 0.38 3,949.05 MWD+IFR-AK-CAZ-SC(3) 6,677.49 65.25 119.38 4,395.58 4,325.30 -2,008.05 3,500.10 5,963,751.37 352,689.98 0.61 4,035.20 MWD+IFR-AK-CAZ-SC(3) 6,772.09 65.43 117.93 4,435.05 4,364.77 -2,049.28 3,575.54 5,963,708.65 352,764.57 1.41 4,121.15 MWD+IFR-AK-CAZ-SC(3) 6,865.63 65.50 117.01 4,473.90 4,403.62 -2,088.53 3,651.04 5,963,667.89 352,839.26 0.90 4,206.18 MWD+1FR-AK-CAZ-SC(3) 6,960.60 65.92 118.11 4,512.96 4,442.68 -2,128.58 3,727.78 5,963,626.31 352,915.17 1.14 4,292.69 MWD+IFR-AK-CAZ-SC(3) 7,054.41 65.87 117.03 4,551.28 4,481.00 -2,168.21 3,803.68 5,963,585.16 352,990.26 1.05 4,378.26 MWD+IFR-AK-CAZ-SC(3) 7,148.47 66.03 117.67 4,589.61 4,519.33 -2,207.68 3,879.97 5,963,544.18 353,065.74 0.64 4,464.08 MWD+IFR-AK-CAZ-SC(3) 7,243.58 66.19 118.79 4,628.13 4,557.85 -2,248.81 3,956.59 5,963,501.52 353,141.51 1.09 4,551.01 MWD+1FR-AK-CAZ-SC(3) 7,337.39 66.61 119.75 4,665.69 4,595.41 -2,290.84 4,031.58 5,963,458.00 353,215.63 1.04 4,636.97 MWD+IFR-AK-CAZ-SC(3) 7,431.42 66.50 120.46 4,703.10 4,632.82 -2,334.11 4,106.21 5,963,413.24 353,289.37 0.70 4,723.24 MWD+IFR-AK-CAZ-SC(3) 7,526.27 66.64 121.35 4,740.81 4,670.53 -2,378.81 4,180.88 5,963,367.05 353,363.12 0.87 4,810.25 MWD+IFR-AK-CAZ-SC(3) 7,620.32 66.41 122.87 4,778.28 4,708.00 -2,424.66 4,253.94 5,963,319.75 353,435.25 1.50 4,896.43 MWD+IFR-AK-CAZ-SC(3) 7,714.93 66.32 122.68 4,816.21 4,745.93 -2,471.58 4,326.82 5,963,271.38 353,507.16 0.21 4,982.97 MWD+1FR-AK-CAZ-SC(3) 7,808.66 66.28 121.68 4,853.89 4,783.61 -2,517.29 4,399.46 5,963,224.22 353,578.86 0.98 5,068.71 MWD+1FR-AK-CAZ-SC(3) 7,903.34 66.39 119.52 4,891.89 4,821.61 -2,561.43 4,474.10 5,963,178.60 353,652.59 2.09 5,155.41 MWD+IFR-AK-CAZ-SC(3) 7,998.36 66.40 118.48 4,929.94 4,859.66 -2,603.64 4,550.25 5,963,134.87 353,727.88 1.00 5,242.48 MWD+IFR-AK-CAZ-SC(3) 8,093.00 65.91 117.98 4,968.20 4,897.92 -2,644.58 4,626.51 5,963,092.40 353,803.30 0.71 5,329.01 MWD+IFR-AK-CAZ-SC(3) 8,186.18 65.34 117.70 5,006.66 4,936.38 -2,684.22 4,701.56 5,963,051.27 353,877.53 0.67 5,413.84 MWD+IFR-AK-CAZ-SC(3) 6/23/2017 9:23:57AM Page 4 COMPASS 5000.1 Build 74 III) • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 8,280 66 65.35 117.35 5,046.07 4,975.79 -2,723.90 4,777.71 5,963,010.07 353,952.86 0.34 5,499.65 MWD+IFR-AK-CAZ-SC(3) 8,375.48 65.52 116.07 5,085.49 5,015.21 -2,762.66 4,854.74 5,962,969.77 354,029.09 1.24 5,585.77 MWD+IFR-AK-CAZ-SC(3) 8,470.22 65.44 117.09 5,124.81 5,054.53 -2,801.23 4,931.83 5,962,929.67 354,105.38 0.98 5,671.84 MWD+IFR-AK-CAZ-SC(3) 8,564.22 65.42 117.51 5,163.90 5,093.62 -2,840.44 5,007.79 5,962,888.95 354,180.54 0.41 5,757.26 MWD+IFR-AK-CAZ-SC(3) 8,658.87 65.54 117.13 5,203.18 5,132.90 -2,879.96 5,084.30 5,962,847.90 354,256.24 0.39 5,843.30 MWD+IFR-AK-CAZ-SC(3) 8,751.81 65.37 116.57 5,241.79 5,171.51 -2,918.15 5,159.73 5,962,808.21 354,330.88 0.58 5,927.74 MWD+IFR-AK-CAZ-SC(3) 8,846.18 65.84 118.36 5,280.77 5,210.49 -2,957.78 5,235.98 5,962,767.05 354,406.31 1.80 6,013.62 MWD+IFR-AK-CAZ-SC(3) 8,941.31 65.49 118.83 5,319.97 5,249.69 -2,999.27 5,312.09 5,962,724.05 354,481.56 0.58 6,100.28 MWD+IFR-AK-CAZ-SC(3) 9,035.98 66.20 118.94 5,358.71 5,288.43 -3,041.00 5,387.72 5,962,680.82 354,556.34 0.76 6,186.65 MWD+IFR-AK-CAZ-SC(3) 9,128.38 66,61 119.62 5,395.69 5,325.41 -3,082.41 5,461.58 5,962,637.93 354,629.34 0.81 6,271.32 MWD+IFR-AK-CAZ-SC(3) 9,222.00 66.47 121.23 5,432.96 5,362.68 -3,125.90 5,535.63 5,962,592.97 354,702.50 1.58 6,357.19 MWD+1FR-AK-CAZ-SC(3) 9,315.92 66.45 121.79 5,470.47 5,400.19 -3,170.90 5,609.04 5,962,546.51 354,774.98 0.55 6,443.25 MWD+IFR-AK-CAZ-SC(3) 9,408.74 66.38 121.77 5,507.61 5,437.33 -3,215.70 5,681.35 5,962,500.27 354,846.38 0.08 6,528.26 MWD+IFR-AK-CAZ-SC(3) 9,502.55 66.39 121.50 5,545.19 5,474.91 -3,260.78 5,754.53 5,962,453.73 354,918.63 0.26 6,614.16 MWD+IFR-AK-CAZ-SC(3) 9,597.09 66.41 121.98 5,583.04 5,512.76 -3,306.36 5,828.21 5,962,406.68 354,991.37 0.47 6,700.74 MWD+IFR-AK-CAZ-SC(3) 9,691.58 66.38 121.74 5,620.88 5,550.60 -3,352.06 5,901.75 5,962,359.52 355,063.98 0.23 6,787.26 MWD+IFR-AK-CAZ-SC(3) 9,785.26 66.44 120.19 5,658.37 5,588.09 -3,396.23 5,975.36 5,962,313.88 355,136.68 1.52 6,873.08 MWD+IFR-AK-CAZ-SC(3) 9,879.51 66.61 118.65 5,695.92 5,625.64 -3,438.69 6,050.66 5,962,269.92 355,211.11 1.51 6,959.53 MWD+IFR-AK-CAZ-SC(3) 9,973.79 66.55 118.53 5,733.39 5,663.11 -3,480.09 6,126.62 5,962,227.01 355,286.22 0.13 7,046.03 MWD+IFR-AK-CAZ-SC(3) 10,066.44 65.97 119.87 5,770.69 5,700.41 -3,521.46 6,200.65 5,962,184.16 355,359.40 1.46 7,130.83 MWD+IFR-AK-CAZ-SC(3) 10,161.22 66.07 119.43 5,809.21 5,738.93 -3,564.30 6,275.91 5,962,139.82 355,433.78 0.44 7,217.43 MWD+1FR-AK-CAZ-SC(3) 10,255.83 65.99 119.44 5,847.65 5,777.37 -3,606.79 6,351.20 5,962,095.83 355,508.19 0.09 7,303.88 MWD+IFR-AK-CAZ-SC(3) 10,350.32 65.85 119.79 5,886.20 5,815.92 -3,649.42 6,426.20 5,962,051.71 355,582.32 0.37 7,390.15 MWD+IFR-AK-CAZ-SC(3) 10,444.68 65.85 119.01 5,924.80 5,854.52 -3,691.69 6,501.21 5,962,007.95 355,656.46 0.75 7,476.25 MWD+IFR-AK-CAZ-SC(3) 10,538.98 65.94 117.89 5,963.32 5,893.04 -3,732.69 6,576.89 5,961,965.43 355,731.29 1.09 7,562.30 MWD+IFR-AK-CAZ-SC(3) 10,632.74 66.08 118.43 6,001.44 5,931.16 -3,773.12 6,652.41 5,961,923.50 355,805.98 0.55 7,647.93 MWD+IFR-AK-CAZ-SC(3) 10,727.62 65.95 119.06 6,040.01 5,969.73 -3,814.81 6,728.42 5,961,880.30 355,881.13 0.62 7,734.61 MWD+IFR-AK-CAZ-SC(3) 10,819.25 65.94 118.24 6,077.36 6,007.08 -3,854.92 6,801.85 5,961,838.72 355,953.73 0.82 7,818.27 MWD+IFR-AK-CAZ-SC(3) 10,913.44 65.89 119.22 6,115.80 6,045.52 -3,896.26 6,877.25 5,961,795.88 356,028.28 0.95 7,904.25 MWD+IFR-AK-CAZ-SC(3) 11,007.68 65.92 119.20 6,154.27 6,083.99 -3,938.24 6,952.34 5,961,752.41 356,102.51 0.04 7,990.27 MWD+IFR-AK-CAZ-SC(3) 11,101.82 65.86 118.46 6,192.73 6,122.45 -3,979.68 7,027.61 5,961,709.47 356,176.93 0.72 8,076.19 MWD+IFR-AK-CAZ-SC(3) 11,197.31 65.92 118.40 6,231.73 6,161.45 -4,021.17 7,104.26 5,961,666.45 356,252.73 0.09 8,163.33 MWD+IFR-AK-CAZ-SC(3) 11,291.96 65.97 117.94 6,270.31 6,200.03 -4,061.97 7,180.46 5,961,624.13 356,328.08 0.45 8,249.73 MWD+IFR-AK-CAZ-SC(3) 11,386.07 66.39 118.51 6,308.32 6,238.04 -4,102.69 7,256.31 5,961,581.90 356,403.09 0.71 8,335.80 MWD+1FR-AK-CAZ-SC(3) 11,481.39 66.45 118.11 6,346.45 6,276.17 -4,144.12 7,333.22 5,961,538.93 356,479.15 0.39 8,423.13 MWD+IFR-AK-CAZ-SC(3) 11,574.65 66.29 119.02 6,383.84 6,313.56 -4,184.97 7,408.26 5,961,496.59 356,553.35 0.91 8,508.56 MWD+IFR-AK-CAZ-SC(3) 11,668.96 66.42 118.83 6,421.66 6,351.38 -4,226.76 7,483.88 5,961,453.29 356,628.11 0.23 8,594.94 MWD+IFR-AK-CAZ-SC(3) 11,763.99 66.36 119.54 6,459.72 6,389.44 -4,269.22 7,559.90 5,961,409.32 356,703.25 0.69 8,682.01 MWD+IFR-AK-CAZ-SC(3) 11,857.95 66.36 119.68 6,497.40 6,427.12 -4,311.75 7,634.73 5,961,365.30 356,777.21 0.14 8,768.09 MWD+IFR-AK-CAZ-SC(3) 11,952.69 66.48 119.55 6,535.30 6,465.02 -4,354.66 7,710.22 5,961,320.89 356,851.82 0.18 8,854.92 MWD+IFR-AK-CAZ-SC(3) 6/23/2017 9:23:57AM Page 5 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey I Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 12,046.22 66.45 120.74 6,572.64 6,502.36 -4,397.72 7,784.37 5,961,276.35 356,925.08 1.17 8,940.66 MWD+IFR-AK-CAZ-SC(3) 12,140.19 66.43 120.20 6,610.21 6,539.93 -4,441.40 7,858.61 5,961,231.19 356,998.43 0.53 9,026.79 MWD+IFR-AK-CAZ-SC(3) 12,234.50 65.94 119.92 6,648.29 6,578.01 -4,484.61 7,933.29 5,961,186.49 357,072.21 0.59 9,113.07 MWD+IFR-AK-CAZ-SC(3) 12,328.29 65.78 122.06 6,686.65 6,616.37 -4,528.68 8,006.65 5,961,140.96 357,144.67 2.09 9,198.63 MWD+IFR-AK-CAZ-SC(3) 12,420.99 65.85 121.04 6,724.63 6,654.35 -4,572.92 8,078.71 5,961,095.28 357,215.83 1.01 9,283.14 MWD+IFR-AK-CAZ-SC(3) 12,516.42 65.92 120.24 6,763.62 6,693.34 -4,617.31 8,153.65 5,961,049.40 357,289.86 0.77 9,370.23 MWD+IFR-AK-CAZ-SC(3) 12,610.16 65.86 120.52 6,801.91 6,731.63 -4,660.59 8,227.47 5,961,004.66. 357,362.78 0.28 9,455.79 MWD+IFR-AK-CAZ-SC(3) 12,710.15 66.18 121.14 6,842.55 6,772.27 -4,707.41 8,305.92 5,960,956.27 357,440.27 0.65 9,547.12 MWD+IFR-AK-CAZ-SC(4) 12,801.12 66.21 120.91 6,879.26 6,808.98 -4,750.31 8,377.24 5,960,911.95 357,510.71 0.23 9,630.33 MWD+IFR-AK-CAZ-SC(4) 12,892.95 66.15 121.75 6,916.35 6,846.07 -4,793.99 8,449.00 5,960,866.84 357,581.57 0.84 9,714.30 MWD+IFR-AK-CAZ-SC(4) 12,988.30 66.16 122.56 6,954.90 6,884.62 -4,840.40 8,522.83 5,960,818.96 357,654.45 0.78 9,801.43 MWD+IFR-AK-CAZ-SC(4) 13,082.95 66.22 122.77 6,993.11 6,922.83 -4,887.14 8,595.73 5,960,770.77 357,726.39 0.21 9,887.90 MWD+IFR-AK-CAZ-SC(4) 13,176.69 66.23 123.28 7,030.90 6,960.62 -4,933.89 8,667.65 5,960,722.59 357,797.36 0.50 9,973.54 MWD+IFR-AK-CAZ-SC(4) 13,271.16 66.02 124.22 7,069.14 6,998.86 -4,981.88 8,739.48 5,960,673.17 357,868.20 0.94 10,059.70 MWD+IFR-AK-CAZ-SC(4) 13,366.06 66.03 124.19 7,107.70 7,037.42 -5,030.63 8,811.19 5,960,623.00 357,938.92 0.03 10,146.14 MWD+IFR-AK-CAZ-SC(4) 13,459.68 66.00 124.06 7,145.75 7,075.47 -5,078.61 8,882.00 5,960,573.60 358,008.74 0.13 10,231.42 MWD+IFR-AK-CAZ-SC(4) 13,553.48 67.42 123.06 7,182.84 7,112.56 -5,126.24 8,953.80 5,960,524.55 358,079.56 1.80 10,317.37 MWD+IFR-AK-CAZ-SC(4) 13,647.26 69.47 123.67 7,217.29 7,147.01 -5,174.21 9,026.64 5,960,475.13 358,151.42 2.27 10,404.41 MWD+IFR-AK-CAZ-SC(4) 13,741.76 70.61 127.33 7,249.56 7,179.28 -5,225.78 9,098.93 5,960,422.12 358,222.65 3.83 10,492.75 MWD+IFR-AK-CAZ-SC(4) 13,836.07 71.75 129.94 7,279.99 7,209.71 -5,281.52 9,168.65 5,960,365.00 358,291.23 2.88 10,580.91 MWD+IFR-AK-CAZ-SC(4) 13,930.32 73.24 133.45 7,308.35 7,238.07 -5,341.30 9,235.74 5,960,303.88 358,357.11 3.89 10,668.80 MWD+IFR-AK-CAZ-SC(4) 14,024.65 73.73 134.67 7,335.16 7,264.88 -5,404.19 9,300.73 5,960,239.71 358,420.82 1.34 10,756.39 MWD+IFR-AK-CAZ-SC(4) 14,118.08 74.47 136.74 7,360.76 7,290.48 -5,468.50 9,363.47 5,960,174.15 358,482.25 2.27 10,842.73 MWD+IFR-AK-CAZ-SC(4) 14,213.13 75.55 139.49 7,385.35 7,315.07 -5,536.86 9,424.76 5,960,104.59 358,542.15 3.02 10,929.81 MWD+IFR-AK-CAZ-SC(4) 14,307.40 76.12 141.39 7,408.42 7,338.14 -5,607.32 9,482.97 5,960,032.97 358,598.93 2.05 11,015.26 MWD+IFR-AK-CAZ-SC(4) 14,401.35 77.45 144.16 7,429.90 7,359.62 -5,680.14 9,538.29 5,959,959.06 358,652.77 3.20 11,099.36 MWD+IFR-AK-CAZ-SC(4) 14,495.74 78.51 146.18 7,449.56 7,379.28 -5,755.92 9,591.01 5,959,882.25 358,703.95 2.38 11,182.67 MWD+IFR-AK-CAZ-SC(4) 14,590.65 80.46 147.99 7,466.88 7,396.60 -5,834.25 9,641.71 5,959,802.92 358,753.07 2.78 11,265.49 MWD+IFR-AK-CAZ-SC(4) 14,684.00 82.99 146.87 7,480.32 7,410.04 -5,912.09 9,691.44 5,959,724.10 358,801.22 2.96 11,347.22 MWD+IFR-AK-CAZ-SC(4) 14,777.45 82.87 147.40 7,491.82 7,421.54 -5,989.99 9,741.76 5,959,645.21 358,849.97 0.58 11,429.49 MWD+IFR-AK-CAZ-SC(4) 14,872.28 82.99 147.77 7,503.49 7,433.21 -6,069.44 9,792.21 5,959,564.78 358,898.80 0.41 11,512.64 MWD+IFR-AK-CAZ-SC(4) 14,967.00 83.18 147.28 7,514.89 7,444.61 -6,148.76 9,842.70 5,959,484.46 358,947.68 0.55 11,595.76 MWD+IFR-AK-CAZ-SC(4) 15,061.18 83.84 148.58 7,525.54 7,455.26 -6,228.06 9,892.38 5,959,404.19 358,995.76 1.54 11,678.17 MWD+IFR-AK-CAZ-SC(4) 15,155.45 83.85 150.84 7,535.65 7,465.37 -6,308.98 9,939.65 5,959,322.34 359,041.39 2.38 11,759.29 MW0+IFR-AK-CAZ-SC(4) 15,250.30 84.43 151.32 7,545.33 7,475.05 -6,391.57 9,985.28 5,959,238.85 359,085.35 0.79 11,839.80 MWD+IFR-AK-CAZ-SC(4) 15,344.66 85.02 152.61 7,554.01 7,483.73 -6,474.50 10,029.44 5,959,155.06 359,127.84 1.50 11,919.21 MWD+IFR-AK-CAZ-SC(4) 15,439.04 84.79 152.15 7,562.39 7,492.11 -6,557.80 10,073.02 5,959,070.91 359,169.73 0.54 11,998.30 MWD+IFR-AK-CAZ-SC(4) 15,533.83 83.93 152.86 7,571.71 7,501.43 -6,641.47 10,116.57 5,958,986.39 359,211.59 1.17 12,077.54 MWD+IFR-AK-CAZ-SC(4) 15,628.12 83.59 152.60 7,581.95 7,511.67 -6,724.79 10,159.52 5,958,902.23 359,252.85 0.45 12,156.09 MWD+IFR-AK-CAZ-SC(4) 15,722.90 83.51 152.19 7,592.60 7,522.32 -6,808.25 10,203.16 5,958,817.92 359,294.80 0.44 12,235.30 MWD+IFR-AK-CAZ-SC(4) 6/23/2017 9:23:57AM Page 6 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) (0/100') (ft) Survey Tool Name 15,781.33 83.74 152.15 7,599.09 7,528.81 -6,859.60 10,230.27 5,958,766.04 359,320.88 0.40 12,284.27 MWD+IFR-AK-CAZ-SC(4) 15,831.00 84.14 151.08 7,604.33 7,534.05 -6,903.05 10,253.75 5,958,722.13 359,343.48 2.29 12,326.17 NOT an Actual Survey 7-6/8"x 10.112" 15,875.88 84.50 150.11 7,608.78 7,538.50 -6,941.96 10,275.67 5,958,682.79 359,364.62 2.29 12,364.48 MWD+IFR-AK-CAZ-SC(5) 15,970.67 86.42 150.13 7,616.28 7,546.00 -7,023.88 10,322.75 5,958,599.94 359,410.03 2.03 12,445.92 MWD+IFR-AK-CAZ-SC(5) 16,065.16 89.96 151.18 7,619.26 7,548.98 -7,106.19 10,369.02 5,958,516.72 359,454.64 3.91 12,526.86 MWD+IFR-AK-CAZ-SC(5) 16,160.57 91.60 150.50 7,617.97 7,547.69 -7,189.50 10,415.50 5,958,432.51 359,499.44 1.86 12,608.47 MWD+IFR-AK-CAZ-SC(5) 16,255.35 91.27 150.32 7,615.59 7,545.31 -7,271.89 10,462.29 5,958,349.20 359,544.56 0.40 12,689.90 MWD+IFR-AK-CAZ-SC(5) 16,350.12 90.55 150.19 7,614.09 7,543.81 -7,354.17 10,509.30 5,958,266.00 359,589.91 0.77 12,771.46 MWD+IFR-AK-CAZ-SC(5) 16,444.57 89.76 149.53 7,613.83 7,543.55 -7,435.85 10,556.73 5,958,183.39 359,635.68 1.09 12,853.08 MWD+IFR-AK-CAZ-SC(5) 16,539.10 89.66 150.46 7,614.31 7,544.03 -7,517.70 10,604.00 5,958,100.61 359,681.29 0.99 12,934.66 MWD+IFR-AK-CAZ-SC(5) 16,634.15 89.53 151.51 7,614.98 7,544.70 -7,600.82 10,650.10 5,958,016.59 359,725.71 1.11 13,015.85 MWD+1FR-AK-CAZ-SC(5) 16,728.82 89.53 151.57 7,615.76 7,545.48 -7,684.05 10,695.21 5,957,932.48 359,769.14 0.06 13,096.23 MWD+IFR-AK-CAZ-SC(5) 16,823.52 89.83 152.31 7,616.29 7,546.01 -7,767.61 10,739.76 5,957,848.04 359,812.00 0.84 13,176.29 MWD+IFR-AK-CAZ-SC(5) 16,918.44 89.59 153.72 7,616.77 7,546.49 -7,852.20 10,782.83 5,957,762.62 359,853.35 1.51 13,255.57 MWD+IFR-AK-CAZ-SC(5) 17,014.02 89.73 153.52 7,617.33 7,547.05 -7,937.82 10,825.30 5,957,676.16 359,894.09 0.26 13,334.84 MWD+IFR-AK-CAZ-SC(5) 17,109.42 89.42 154.28 7,618.04 7,547.76 -8,023.49 10,867.26 5,957,589.68 359,934.33 0.86 13,413.70 MWD+IFR-AK-CAZ-SC(5) 17,204.34 89.49 155.69 7,618.94 7,548.66 -8,109.50 10,907.40 5,957,502.88 359,972.72 1.49 13,491.13 MWD+IFR-AK-CAZ-SC(5) 17,299.71 89.42 155.32 7,619.85 7,549.57 -8,196.28 10,946.94 5,957,415.33 360,010.51 0.39 13,568.43 MWD+1FR-AK-CAZ-SC(5) 17,395.44 89.63 154.79 7,620.65 7,550.37 -8,283.08 10,987.31 5,957,327.75 360,049.13 0.60 13,646.46 MWD+IFR-AK-CAZ-SC(5) 17,490.52 89.70 154.71 7,621.20 7,550.92 -8,369.07 11,027.87 5,957,240.96 360,087.95 0.11 13,724.25 MWD+IFR-AK-CAZ-SC(5) 17,585.67 89.42 155.31 7,621.93 7,551.65 -8,455.31 11,068.06 5,957,153.94 360,126.40 0.70 13,801.85 MWD+IFR-AK-CAZ-SC(5) 17,680.69 89.46 154.71 7,622.86 7,552.58 -8,541.43 11,108.20 5,957,067.04 360,164.80 0.63 13,879.34 MWD+IFR-AK-CAZ-SC(5) 17,775.95 89.97 153.12 7,623.33 7,553.05 -8,626.99 11,150.09 5,956,980.67 360,204.96 1.75 13,958.07 MWD+1FR-AK-CAZ-SC(5) 17,871.22 89.66 152.81 7,623.64 7,553.36 -8,711.85 11,193.39 5,956,894.96 360,246.54 0.46 14,037.69 MWD+IFR-AK-CAZ-SC(5) 17,966.20 89.73 151.63 7,624.15 7,553.87 -8,795.88 11,237.66 5,956,810.07 360,289.11 1.24 14,117.73 MWD+IFR-AK-CAZ-SC(5) 18,061.50 89.70 150.43 7,624.62 7,554.34 -8,879.25 11,283.82 5,956,725.79 360,333.58 1.26 14,199.09 MWD+1FR-AK-CAZ-SC(5) 18,156.90 89.77 148.92 7,625.06 7,554.78 -8,961.59 11,331.98 5,956,642.50 360,380.08 1.58 14,281.69 MWD+IFR-AK-CAZ-SC(5) 18,251.61 89.56 147.97 7,625.62 7,555.34 -9,042.30 11,381.54 5,956,560.83 360,428.01 1.03 14,364.69 MWD+IFR-AK-CAZ-SC(5) 18,347.36 89.42 148.49 7,626.47 7,556.19 -9,123.70 11,431.95 5,956,478.44 360,476.77 0.56 14,448.77 MWD+IFR-AK-CAZ-SC(5) 18,442.64 89.28 149.79 7,627.55 7,557.27 -9,205.48 11,480.82 5,956,395.69 360,523.99 1.37 14,531.71 MW0+IFR-AK-CAZ-SC(5) 18,538.38 89.87 149.54 7,628.26 7,557.98 -9,288.11 11,529.18 5,956,312.12 360,570.67 0.67 14,614.61 MWD+IFR-AK-CAZ-SC(5) 18,634.14 89.90 150.67 7,628.45 7,558.17 -9,371.13 11,576.90 5,956,228.16 360,616.71 1.18 14,697.16 MWD+IFR-AK-CAZ-SC(5) 18,728.69 89.66 152.32 7,628.82 7,558.54 -9,454.21 11,622.02 5,956,144.20 360,660.15 1.76 14,777.48 MWD+IFR-AK-CAZ-SC(5) 18,824.48 90.04 152.91 7,629.07 7,558.79 -9,539.26 11,666.08 5,956,058.28 360,702.49 0.73 14,857.85 MWD+IFR-AK-CAZ-SC(5) 18,920.06 89.94 153.04 7,629.08 7,558.80 -9,624.41 11,709.51 5,955,972.29 360,744.20 0.17 14,937.72 MWD+IFR-AK-CAZ-SC(5) 19,015.38 89.94 155.22 7,629.18 7,558.90 -9,710.17 11,751.10 5,955,885.72 360,784.06 2.29 15,016.29 MWD+1FR-AK-CAZ-SC(5) 19,110.56 89.77 156.53 7,629.42 7,559.14 -9,797.03 11,790.00 5,955,798.09 360,821.20 1.39 15,093.08 MWD+IFR-AK-CAZ-SC(5) 19,205.89 90.08 156.20 7,629.55 7,559.27 -9,884.37 11,828.22 5,955,710.02 360,857.66 0.47 15,169.50 MWD+IFR-AK-CAZ-SC(5) 19,300.98 90.08 156.34 7,629.42 7,559.14 -9,971.42 11,866.49 5,955,622.22 360,894.17 0.15 15,245.82 MWD+IFR-AK-CAZ-SC(5) 19,396.02 90.14 158.16 7,629.23 7,558.95 -10,059.06 11,903.24 5,955,533.87 360,929.15 1.92 15,321.12 MWD+IFR-AK-CAZ-SC(5) 6/23/2017 9:23:57AM Page 7 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +EI-W Northing Easting DLS Section (usft) (°) ( ) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 19,491.43 90.32 156.18 7,628.85 7,558.57 -10,146.99 11,940.26 5,955,445.22 360,964.39 2.08 15,396.80 MWD+IFR-AK-CAZ-SC(5) 19,586.58 90.93 154.42 7,627.81 7,557.53 -10,233.43 11,980.01 5,955,358.01 361,002.40 1.96 15,474.11 MWD+IFR-AK-CAZ-SC(5) 19,680.92 91.00 153.87 7,626.22 7,555.94 -10,318.31 12,021.15 5,955,272.32 361,041.82 0.59 15,551.86 MWD+IFR-AK-CAZ-SC(5) 19,777.36 90.13 153.78 7,625.27 7,554.99 -10,404.86 12,063.69 5,955,184.95 361,082.61 0.91 15,631.64 MWD+IFR-AK-CAZ-SC(5) 19,872.23 90.35 152.78 7,624.88 7,554.60 -10,489.59 12,106.34 5,955,099.37 361,123.55 1.08 15,710.64 MWD+IFR-AK-CAZ-SC(5) 19,967.07 90.52 151.71 7,624.16 7,553.88 -10,573.52 12,150.51 5,955,014.59 361,166.02 1.14 15,790.54 MWD+IFR-AK-CAZ-SC(5) 20,062.15 90.01 151.57 7,623.72 7,553.44 -10,657.19 12,195.67 5,954,930.04 361,209.49 0.56 15,871.19 MWD+IFR-AK-CAZ-SC(5) 20,157.10 90.02 149.90 7,623.69 7,553.41 -10,740.01 12,242.08 5,954,846.30 361,254.23 1.76 15,952.50 MWD+IFR-AK-CAZ-SC(5) 20,252.26 88.70 150.47 7,624.75 7,554.47 -10,822.57 12,289.39 5,954,762.81 361,299.87 1.51 16,034.46 MWD+IFR-AK-CAZ-SC(5) 20,347.63 86.72 151.35 7,628.56 7,558.28 -10,905.84 12,335.72 5,954,678.64 361,344.51 2.27 16,115.92 MWD+IFR-AK-CAZ-SC(5) 20,443.91 86.95 150.81 7,633.88 7,563.60 -10,989.98 12,382.21 5,954,593.58 361,389.29 0.61 16,197.95 MWD+IFR-AK-CAZ-SC(5) 20,538.71 87.09 149.44 7,638.81 7,568.53 -11,072.07 12,429.37 5,954,510.57 361,434.79 1.45 16,279.55 MWD+IFR-AK-CAZ-SC(5) 20,634.16 86.92 148.96 7,643.80 7,573.52 -11,153.95 12,478.17 5,954,427.74 361,481.94 0.53 16,362.47 MWD+IFR-AK-CAZ-SC(5) 20,730.29 87.19 146.33 7,648.74 7,578.46 -11,235.04 12,529.55 5,954,345.64 361,531.67 2.75 16,447.24 MWD+IFR-AK-CAZ-SC(5) 20,824.53 87.23 147.27 7,653.32 7,583.04 -11,313.80 12,581.09 5,954,265.86 361,581.62 1.00 16,531.00 MWD+IFR-AK-CAZ-SC(5) 20,877.83 87.19 147.93 7,655.92 7,585.64 -11,358.75 12,609.61 5,954,220.35 361,609.23 1.24 16,578.03 MWD+IFR-AK-CAZ-SC(5) 20,919.40 87.19 148.02 7,657.96 7,587.68 -11,393.95 12,631.63 5,954,184.72 361,630.53 0.22 16,614.58 MWD+IFR-AK-CAZ-SC(5) 20,963.25 87.26 148.49 7,660.08 7,589.80 -11,431.20 12,654.67 5,954,147.02 361,652.82 1.08 16,653.03 MWD+IFR-AK-CAZ-SC(5) 21,015.41 87.30 149.66 7,662.55 7,592.27 -11,475.89 12,681.45 5,954,101.80 361,678.70 2.24 16,698.41 MWD+IFR-AK-CAZ-SC(5) 21,065.30 87.23 148.54 7,664.93 7,594.65 -11,518.65 12,707.04 5,954,058.54 361,703.42 2.25 16,741.81 MWD+IFR-AK-CAZ-SC(5) 21,111.05 87.23 148.45 7,667.15 7,596.87 -11,557.61 12,730.92 5,954,019.11 361,726.51 0.20 16,781.84 MWD+IFR-AK-CAZ-SC(5) 21,158.50 87.21 149.21 7,669.45 7,599.17 -11,598.16 12,755.45 5,953,978.08 361,750.22 1.60 16,823.22 MWD+IFR-AK-CAZ-SC(5) 21,166.00 87.35 149.08 7,669.80 7,599.52 -11,604.59 12,759.29 5,953,971.57 361,753.93 2.55 16,829.74 NOT an Actual Survey 41/2"x63/4" 21,206.22 88.12 148.40 7,671.39 7,601.11 -11,638.95 12,780.15 5,953,936.81 361,774.09 2.55 16,864.86 MWD+IFR-AK-CAZ-SC(5) 21,255.42 88.84 148.92 7,672.70 7,602.42 -11,680.96 12,805.73 5,953,894.30 361,798.82 1.80 16,907.87 MWD+IFR-AK-CAZ-SC(5) 21,301.24 89.18 148.81 7,673.49 7,603.21 -11,720.17 12,829.41 5,953,854.62 361,821.71 0.78 16,947.86 MWD+IFR-AK-CAZ-SC(5) 21,349.46 89.66 150.29 7,673.98 7,603.70 -11,761.73 12,853.85 5,953,812.58 361,845.31 3.23 16,989.66 MWD+IFR-AK-CAZ-SC(5) 21,396.35 89.80 150.12 7,674.20 7,603.92 -11,802.43 12,877.15 5,953,771.43 361,867.78 0.47 17,030.04 MWD+IFR-AK-CAZ-SC(5) 21,443.09 89.92 151.41 7,674.31 7,604.03 -11,843.21 12,899.98 5,953,730.20 361,889.79 2.77 17,070.06 MWD+IFR-AK-CAZ-SC(5) 21,491.42 90.71 152.40 7,674.05 7,603.77 -11,885.84 12,922.74 5,953,687.12 361,911.68 2.62 17,110.93 MWD+IFR-AK-CAZ-SC(5) 21,532.54 90.45 153.58 7,673.63 7,603.35 -11,922.48 12,941.41 5,953,650.12 361,929.62 2.94 17,145.28 MWD+IFR-AK-CAZ-SC(5) 21,586.14 90.42 152.66 7,673.22 7,602.94 -11,970.28 12,965.64 5,953,601.84 361,952.88 1.72 17,189.99 MWD+IFR-AK-CAZ-SC(5) 21,682.11 90.49 152.35 7,672.46 7,602.18 -12,055.41 13,009.95 5,953,515.85 361,995.47 0.33 17,270.61 MWD+IFR-AK-CAZ-SC(5) 21,777.09 90.66 151.23 7,671.51 7,601.23 -12,139.10 13,054.84 5,953,431.27 362,038.67 1.19 17,351.04 MWD+IFR-AK-CAZ-SC(5) 21,871.36 90.45 153.47 7,670.59 7,600.31 -12,222.60 13,098.58 5,953,346.92 362,080.72 2.39 17,430.36 MWD+IFR-AK-CAZ-SC(5) 21,966.69 90.69 152.55 7,669.64 7,599.36 -12,307.54 13,141.85 5,953,261.14 362,122.27 1.00 17,509.98 MWD+IFR-AK-CAZ-SC(5) 22,061.58 89.94 153.43 7,669.12 7,598.84 -12,392.08 13,184.94 5,953,175.76 362,163.65 1.22 17,589.26 MWD+IFR-AK-CAZ-SC(5) 22,156.80 89.49 153.00 7,669.60 7,599.32 -12,477.08 13,227.85 5,953,089.92 362,204.84 0.65 17,668.60 MWD+IFR-AK-CAZ-SC(5) 22,251.84 89.15 152.74 7,670.72 7,600.44 -12,561.66 13,271.18 5,953,004.49 362,246.47 0.45 17,748.11 MWD+IFR-AK-CAZ-SC(5) 6/23/2017 9:23:57AM Page 8 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 i Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 22,347.46 88.69 152.67 7,672.53 7,602.25 -12,646.62 13.315.02 5,952,918.68 362,288.59 0.49 17,828.24 MWD+IFR-AK-CAZ-SC(5) 22,442.54 88.98 153.05 7,674.46 7,604.18 -12,731.21 13,358.39 5,952,833.24 362,330.24 0.50 17,907.78 MWD+IFR-AK-CAZ-SC(5) 22,537.71 89.18 152.48 7,675.99 7,605.71 -12,815.82 13,401.94 5,952,747.78 362,372.08 0.63 17,987.49 MWD+IFR-AK-CAZ-SC(5) 22,633.37 88.60 152.84 7,677.84 7,607.56 -12,900.78 13,445.86 5,952,661.96 362,414.29 0.71 18,067.69 MWD+IFR-AK-CAZ-SC(5) 22,728.34 88.26 153.02 7,680.44 7,610.16 -12,985.31 13,489.06 5,952,576.58 362,455.78 0.41 18,147.06 MWD+IFR-AK-CAZ-SC(5) 22,823.57 88.25 154.59 7,683.34 7,613.06 -13,070.72 13,531.08 5,952,490.36 362,496.07 1.65 18,225.83 MWD+IFR-AK-CAZ-SC(5) 22,918.53 89.15 154.70 7,685.50 7,615.22 -13,156.51 13,571.73 5,952,403.77 362,534.99 0.95 18,303.61 MWD+IFR-AK-CAZ-SC(5) 23,013.05 89.80 153.92 7,686.36 7,616.08 -13,241.68 13,612.71 5,952,317.80 362,574.24 1.07 18,381.35 MWD+IFR-AK-CAZ-SC(5) 23,108.26 89.70 153.34 7,686.78 7,616.50 -13,326.98 13,654.99 5,952,231.68 362,614.80 0.62 18,460.31 MWD+IFR-AK-CAZ-SC(5) 23,203.78 89.70 154.18 7,687.28 7,617.00 -13,412.66 13,697.22 5,952,145.18 362,655.30 0.88 18,539.40 MWD+IFR-AK-CAZ-SC(5) 23,299.09 89.59 153.20 7,687.87 7,617.59 -13,498.09 13,739.47 5,952,058.92 362,695.82 1.03 18,618.38 MWD+IFR-AK-CAZ-SC(5) 23,395.24 89.73 152.52 7,688.44 7,618.16 -13,583.65 13,783.33 5,951,972.50 362,737.95 0.72 18,698.83 MWD+IFR-AK-CAZ-SC(5) 23,488.94 89.80 153.75 7,688.83 7,618.55 -13,667.24 13,825.67 5,951,888.09 362,778.60 1.31 18,776.98 MWD+IFR-AK-CAZ-SC(5) 23,584.64 89.70 154.35 7,689.24 7,618.96 -13,753.29 13,867.54 5,951,801.22 362,818.74 0.64 18,855.94 MWD+IFR-AK-CAZ-SC(5) 23,679.33 89.83 155.18 7,689.63 7,619.35 -13,838.94 13,907.91 5,951,714.78 362,857.37 0.89 18,933.40 MWD+IFR-AK-CAZ-SC(5) 23,774.35 89.73 154.63 7,690.00 7,619.72 -13,924.99 13,948.21 5,951,627.95 362,895.94 0.59 19,011.00 MWD+IFR-AK-CAZ-SC(5) 23,869.77 89.10 153.80 7,690.97 7,620.69 -14,010.90 13,989.72 5,951,541.22 362,935.70 1.09 19,089.58 MWD+IFR-AK-CAZ-SC(5) 23,964.07 89.80 155.15 7,691.88 7,621.60 -14,095.99 14,030.35 5,951,455.34 362,974.62 1.61 19,166.98 MWD+IFR-AK-CAZ-SC(5) 24,061.01 89.87 153.32 7,692.15 7,621.87 -14,183.29 14,072.48 5,951,367.22 363,014.99 1.89 19,246.79 MWD+IFR-AK-CAZ-SC(5) 24,155.80 90.38 153.72 7,691.95 7,621.67 -14,268.13 14,114.75 5,951,281.55 363,055.54 0.68 19,325.50 MWD+IFR-AK-CAZ-SC(5) 24,251.86 90.36 152.87 7,691.33 7,621.05 -14,353.94 14,157.92 5,951,194.90 363,096.97 0.89 19,405.47 MWD+IFR-AK-CAZ-SC(5) 24,346.04 91.91 153.03 7,689.46 7,619.18 -14,437.80 14,200.74 5,951,110.20 363,138.09 1.65 19,484.18 MWD+IFR-AK-CAZ-SC(5) 24,441.81 91.73 152.08 7,686.42 7,616.14 -14,522.75 14,244.85 5,951,024.39 363,180.49 1.01 19,564.54 MWD+IFR-AK-CAZ-SC(5) 24,537.42 90.32 151.32 7,684.71 7,614.43 -14,606.92 14,290.17 5,950,939.34 363,224.11 1.68 19,645.57 MWD+IFR-AK-CAZ-SC(5) 24,633.14 88.74 151.78 7,685.50 7,615.22 -14,691.07 14,335.77 5,950,854.29 363,268.01 1.72 19,726.83 MWD+IFR-AK-CAZ-SC(5) 24,728.33 89.61 150.56 7,686.87 7,616.59 -14,774.45 14,381.67 5,950,770.01 363,312.21 1.57 19,807.97 MWD+IFR-AK-CAZ-SC(5) 24,823.64 88.26 150.08 7,688.64 7,618.36 -14,857.24 14,428.85 5,950,686.30 363,357.72 1.50 19,889.94 MWD+IFR-AK-CAZ-SC(5) 24,918.83 87.35 150.20 7,692.28 7,622.00 -14,939.73 14,476.21 5,950,602.88 363,403.41 0.96 19,971.91 MWD+IFR-AK-CAZ-SC(5) 25,014.62 87.32 149.37 7,696.74 7,626.46 -15,022.42 14,524.36 5,950,519.25 363,449.89 0.87 20,054.66 MWD+IFR-AK-CAZ-SC(5) 25,109.55 88.39 150.26 7,700.29 7,630.01 -15,104.42 14,572.06 5,950,436.32 363,495.93 1.47 20,136.68 MWD+IFR-AK-CAZ-SC(5) 25,205.31 88.87 152.20 7,702.58 7,632.30 -15,188.33 14,618.13 5,950,351.50 363,540.30 2.09 20,218.24 MWD+IFR-AK-CAZ-SC(5) 25,300.68 89.39 151.60 7,704.03 7,633.75 -15,272.45 14,663.05 5,950,266.51 363,583.52 0.83 20,298.89 MWD+IFR-AK-CAZ-SC(5) 25,395.98 89.32 150.87 7,705.10 7,634.82 -15,355.98 14,708.90 5,950,182.07 363,627.68 0.77 20,380.07 MWD+IFR-AK-CAZ-SC(5) 25,491.25 88.65 150.43 7,706.79 7,636.51 -15,439.01 14,755.59 5,950,098.13 363,672.69 0.84 20,461.72 MWD+IFR-AK-CAZ-SC(5) 25,585.52 89.59 151.82 7,708.24 7,637.96 -15,521.55 14,801.11 5,950,014.70 363,716.54 1.78 20,542.11 MWD+IFR-AK-CAZ-SC(5) 25,681.54 89.77 151.03 7,708.77 7,638.49 -15,605.87 14,847.03 5,949,929.48 363,760.76 0.84 20,623.75 MWD+IFR-AK-CAZ-SC(5) 25,777.03 89.46 151.84 7,709.41 7,639.13 -15,689.73 14,892.69 5,949,844.73 363,804.72 0.91 20,704.92 MWD+IFR-AK-CAZ-SC(5) 25,873.49 89.29 149.53 7,710.47 7,640.19 -15,773.83 14,939.91 5,949,759.70 363,850.24 2.40 20,787.56 MWD+IFR-AK-CAZ-SC(5) 25,967.29 88.45 149.88 7,712.32 7,642.04 -15,854.80 14,987.22 5,949,677.80 363,895.91 0.97 20,868.74 MWD+IFR-AK-CAZ-SC(5) 26,062.64 89.15 148.26 7,714.31 7,644.03 -15,936.57 15,036.22 5,949,595.07 363,943.25 1.85 20,951.77 MWD+IFR-AK-CAZ-SC(5) 6/23/2017 9:23:57AM Page 9 COMPASS 5000.1 Build 74 • 411 , • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 26,157.64 89.77 148.27 7,715.21 7,644.93 -16,017.36 15,086.18 5,949,513.30 363,991.58 0.65 21,035.17 MWD+IFR-AK-CAZ-SC(5) 26,252.63 89.77 147.74 7,715.59 7,645.31 -16,097.92 15,136.51 5,949,431.75 364,040.28 0.56 21,118.77 MWD+IFR-AK-CAZ-SC(5) 26,348.22 89.66 149.54 7,716.07 7,645.79 -16,179.55 15,186.26 5,949,349.15 364,088.37 1.89 21,202.38 MWD+IFR-AK-CAZ-SC(5) 26,442.73 89.70 149.36 7,716.59 7,646.31 -16,260.93 15,234.29 5,949,266.82 364,134.76 0.20 21,284.39 MWD+IFR-AK-CAZ-SC(5) 26,538.16 89.14 149.08 7,717.56 7,647.28 -16,342.92 15,283.13 5,949,183.88 364,181.93 0.66 21,367.39 MWD+IFR-AK-CAZ-SC(5) 26,633.78 89.56 149.49 7,718.64 7,648.36 -16,425.12 15,331.96 5,949,100.72 364,229.11 0.61 21,450.50 MWD+IFR-AK-CAZ-SC(5) 26,728.55 89.73 149.67 7,719.23 7,648.95 -16,506.84 15,379.95 5,949,018.06 364,275.44 0.26 21,532.64 MWD+IFR-AK-CAZ-SC(5) 26,824.03 89.48 149.52 7,719.89 7,649.61 -16,589.19 15,428.27 5,948,934.76 364,322.09 0.31 21,615.37 MWD+IFR-AK-CAZ-SC(5) 26,919.11 90.25 150.58 7,720.11 7,649.83 -16,671.57 15,475.74 5,948,851.45 364,367.89 1.38 21,697.38 MWD+IFR-AK-CAZ-SC(5) 27,013.22 91.04 149.85 7,719.05 7,648.77 -16,753.24 15,522.48 5,948,768.87 364,412.98 1.14 21,778.41 MWD+IFR-AK-CAZ-SC(5) 27,109.37 92.42 150.75 7,716.15 7,645.87 -16,836.72 15,570.10 5,948,684.46 364,458.91 1.71 21,861.09 MWD+IFR-AK-CAZ-SC(5) 27,204.71 92.41 150.88 7,712.13 7,641.85 -16,919.88 15,616.55 5,948,600.38 364,503.68 0.14 21,942.61 MWD+IFR-AK-CAZ-SC(5) 27,299.78 92.34 152.81 7,708.19 7,637.91 -17,003.62 15,661.37 5,948,515.76 364,546.80 2.03 22,022.99 MWD+IFR-AK-CAZ-SC(5) 27,395.24 92.44 154.52 7,704.21 7,633.93 -17,089.10 15,703.67 5,948,429.46 364,587.38 1.79 22,102.05 MWD+IFR-AK-CAZ-SC(5) 27,490.67 92.51 155.65 7,700.09 7,629.81 -17,175.57 15,743.84 5,948,342.21 364,625.80 1.19 22,179.73 MWD+IFR-AK-CAZ-SC(5) 27,586.41 92.48 156.00 7,695.92 7,625.64 -17,262.83 15,783.01 5,948,254.19 364,663.21 0.37 22,256.95 MWD+IFR-AK-CAZ-SC(5) 27,681.79 92.51 155.14 7,691.77 7,621.49 -17,349.58 15,822.42 5,948,166.66 364,700.87 0.90 22,334.12 MWD+IFR-AK-CAZ-SC(5) 27,777.00 92.32 155.13 7,687.76 7,617.48 -17,435.89 15,862.42 5,948,079.58 364,739.12 0.20 22,411.58 MWD+IFR-AK-CAZ-SC(5) 27,871.79 93.41 153.99 7,683.02 7,612.74 -17,521.38 15,903.08 5,947,993.29 364,778.06 1.66 22,489.22 MWD+IFR-AK-CAZ-SC(5) 27,966.73 93.09 152.61 7,677.64 7,607.36 -17,606.06 15,945.67 5,947,907.79 364,818.93 1.49 22,568.12 MWD+IFR-AK-CAZ-SC(5) 28,062.35 92.46 152.20 7,673.01 7,602.73 -17,690.70 15,989.91 5,947,822.28 364,861.46 0.79 22,648.45 MWD+IFR-AK-CAZ-SC(5) 28,158.67 92.99 151.07 7,668.43 7,598.15 -17,775.36 16,035.62 5,947,736.72 364,905.46 1.29 22,730.06 MWD+IFR-AK-CAZ-SC(5) 28,252.86 92.96 151.30 7,663.54 7,593.26 -17,857.78 16,080.96 5,947,653.42 364,949.13 0.25 22,810.23 MWD+IFR-AK-CAZ-SC(5) 28,348.09 93.54 151.61 7,658.14 7,587.86 -17,941.29 16,126.39 5,947,569.01 364,992.87 0.69 22,891.04 MWD+IFR-AK-CAZ-SC(5) 28,443.09 93.47 152.32 7,652.34 7,582.06 -18,024.99 16,170.96 5,947,484.45 365,035.75 0.75 22,971.18 MWD+IFR-AK-CAZ-SC(5) 28,537.72 93.64 150.30 7,646.47 7,576.19 -18,107.84 16,216.30 5,947,400.71 365,079.41 2.14 23,051.57 MWD+IFR-AK-CAZ-SC(5) 28,585.18 93.51 151.37 7,643.51 7,573.23 -18,149.20 16,239.38 5,947,358.90 365,101.66 2.27 23,092.09 MWD+IFR-AK-CAZ-SC(5) 28,645.00 93.51 151.37 7,639.85 7,569.57 -18,201.61 16,267.99 5,947,305.93 365,129.20 0.00 23,142.88 PROJECTED to TO Final Definitive Survey Verified and Signed-off AN targets and/or welt position objectives have been achieved. D+ Yes Nu I have checked to the best of my ability that the following date is correct: p Surface Coordinates ID Decimation&Convergence fEi GRS Survey Corrections ,r_ Survey Tool Codes SLB DE' BIL/ gime Representative' / V. Data: 6/23/2017 6/23/2017 9:23:57AM Page 10 • COMPASS 5000.1 Build 74 21 7017 28326 RECEIVED JUN 29 2017 FINAL AOGCC ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad CD5-17 CD5-17 NAD 83 Definitive Survey Report 22 June, 2017 0 • Definitive Survey Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Project Western North Slope,North Slope Alaska,United States Map System: US State Plane 1983 System Datum: Mean Sea Level Geo Datum: North American Datum 1983 Using Well Reference Point Map Zone: Alaska Zone 4 Using geodetic scale factor Well CD5-17 Well Position +N/-S 0.00 usft Northing: 5,965,575.11 usft Latitude: 70°18'48.243 N +E/-W 0.00 usft Easting: 1,489,264.31 usft Longitude: 151°13'30.316 W Position Uncertainty 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 34.00 usft Wellbore CD5-17 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (0) (nT) BGGM2016 5/1/2017 17.18 80.81 57,504 Design CD5-17 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 36.28 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (0) 36.28 0.00 0.00 119.65 Survey Program Date 6/9/2017 From To (usft) (usft) Survey(Wellbore) Tool Name Description Survey Date 75.00 724.00 CD5-17 Srvy 1-SLB_NSG+SShot(CD5 GYD-GC-SS Gyrodata gyro single shots 4/26/2017 1:49: 752.26 2,158.50 CD5-17 Srvy 2-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 4/26/2017 2:02: 2,258.39 12,610.16 CD5-17 Srvy 3-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 4/29/2017 8:02: 12,710.15 15,781.33 CD5-17 Srvy 4-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/4/2017 9:35:5 15,875.88 28,585.18 CD5-17 Srvy 5-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/14/2017 1:31: Survey Map Map Vertical MD Inc Azi TVD TVDSS +N1-S +E/-W Northing Easting DLS Section (usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) 0100') (ft) Survey Tool Name 75.00 0.30 225.88 75.00 4.72 -0.07 -0.07 5,965,575.04 1,489,264.24 0.77 -0.03 GYD-GC-SS(1) 174.00 0.23 163.07 174.00 103.72 -0.44 -0.20 5,965,574.67 1,489,264.10 0.29 0.04 GYD-GC-SS(1) 265.00 0.16 166.95 265.00 194.72 -0.74 -0.12 5,965,574.37 1,489,264.18 0.08 0.26 GYD-GC-SS(1) 357.00 0.46 311.15 357.00 286.72 -0.62 -0.37 5,965,574.50 1,489,263.93 0.65 -0.01 GYD-GC-SS(1) 449.00 0.92 340.56 448.99 378.71 0.32 -0.89 5,965,575.45 1,489,263.42 0.62 -0.93 GYD-GC-SS(1) 540.00 2.20 359.56 539.96 469.68 2.75 -1.15 5,965,577.89 1,489,263.22 1.50 -2.36 GYD-GC-SS(1) 637.00 3.21 4.98 636.85 566.57 7.32 -0.93 5,965,582.45 1,489,263.53 1.07 -4.43 GYD-GC-SS(1) 724.00 4.00 8.00 723.67 653.39 12.75 -0.29 5,965,587.86 1,489,264.27 0.93 -6.56 GYD-GC-SS(1) 752.26 3.90 7.31 751.87 681.59 14.68 -0.03 5,965,589.79 1,489,264.57 0.39 -7.29 MWD+IFR-AK-CAZ-SC(2) 846.03 3.83 42.96 845.44 775.16 20.14 2.51 5,965,595.19 1,489,267.22 2.52 -7.79 MWD+IFR-AK-CAZ-SC(2) 6/22/2017 1:53:07PM Page 2 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 940.46 3.50 87.83 939.69 869.41 22.56 7.54 5,965,597.51 1,489,272.30 2.98 -4.61 MWD+IFR-AK-CAZ-SC(2) 1,033.37 5.09 109.77 1,032.34 962.06 21.27 14.25 5,965,596.09 1,489,278.98 2.43 1.86 MWD+IFR-AK-CAZ-SC(2) 1,127.46 7.31 115.82 1,125.88 1,055.60 17.25 23.57 5,965,591.88 1,489,288.22 2.46 11.95 MWD+IFR-AK-CAZ-SC(2) 1,221.27 8.37 123.44 1,218.81 1,148.53 10.89 34.64 5,965,585.30 1,489,299.16 1.58 24.72 MWD+IFR-AK-CAZ-SC(2) 1,315.61 9.72 126.32 1,311.98 1,241.70 2.39 46.79 5,965,576.55 1,489,311.13 1.51 39.48 MWD+IFR-AK-CAZ-SC(2) 1,409.83 11.35 130.09 1,404.61 1,334.33 -8.30 60.29 5,965,565.60 1,489,324.41 1.88 56.50 MWD+IFR-AK-CAZ-SC(2) 1,504.04 13.36 128.38 1,496.63 1,426.35 -21.03 75.91 5,965,552.56 1,489,339.78 2.17 76.37 MWD+IFR-AK-CAZ-SC(2) 1,598.23 14.58 123.99 1,588.04 1,517.76 -34.41 94.28 5,965,538.81 1,489,357.87 1.71 98.95 MWD+IFR-AK-CAZ-SC(2) 1,693.35 15.38 120.55 1,679.93 1,609.65 -47.52 115.07 5,965,525.29 1,489,378.39 1.26 123.50 MWD+IFR-AK-CAZ-SC(2) 1,787.28 15.98 120.65 1,770.36 1,700.08 -60.44 136.92 5,965,511.93 1,489,399.97 0.64 148.89 MWD+IFR-AK-CAZ-SC(2) 1,881.01 16.66 122.75 1,860.31 1,790.03 -74.29 159.32 5,965,497.64 1,489,422.09 0.96 175.20 MWD+IFR-AK-CAZ-SC(2) 1,974.87 17.59 127.09 1,950.01 1,879.73 -90.12 181.95 5,965,481.35 1,489,444.39 1.68 202.70 MWD+IFR-AK-CAZ-SC(2) 2,067.51 20.00 131.08 2,037.71 1,967.43 -108.97 205.06 5,965,462.04 1,489,467.12 2.95 232.12 MWD+IFR-AK-CAZ-SC(2) 2,158.50 22.62 131.70 2,122.47 2,052.19 -130.84 229.86 5,965,439.68 1,489,491.47 2.89 264.49 MWD+IFR-AK-CAZ-SC(2) 2,222.00 23.57 130.00 2,180.88 2,110.60 -147.13 248.70 5,965,423.02 1,489,509.98 1.83 288.92 NOT an Actual Survey 10 3/4"x 13-1/2" 2,258.39 24.13 129.08 2,214.17 2,143.89 -156.50 260.05 5,965,413.42 1,489,521.14 1.83 303.42 MWD+IFR-AK-CAZ-SC(3) 2,350.92 26.30 124.23 2,297.88 2,227.60 -179.95 291.69 5,965,389.33 1,489,552.30 3.24 342.52 MWD+IFR-AK-CAZ-SC(3) 2,445.50 29.68 116.85 2,381.41 2,311.13 -202.33 329.93 5,965,366.19 1,489,590.07 5.11 386.82 MWD+IFR-AK-CAZ-SC(3) 2,539.25 32.95 112.44 2,461.51 2,391.23 -222.55 374.22 5,965,345.09 1,489,633.94 4.26 435.32 MWD+IFR-AK-CAZ-SC(3) 2,633.14 35.50 113.03 2,539.13 2,468.85 -242.97 422.92 5,965,323.70 1,489,682.22 2.74 487.74 MWD+IFR-AK-CAZ-SC(3) 2,728.03 38.47 114.03 2,614.92 2,544.64 -265.77 475.24 5,965,299.85 1,489,734.07 3.19 544.49 MWD+IFR-AK-CAZ-SC(3) 2,820.61 41.14 114.32 2,686.04 2,615.76 -290.04 529.30 5,965,274.49 1,489,787.63 2.89 603.48 MWD+IFR-AK-CAZ-SC(3) 2,913.65 44.15 114.56 2,754.47 2,684.19 -316.12 586.68 5,965,247.26 1,489,844.46 3.24 666.25 MWD+IFR-AK-CAZ-SC(3) 3,008.09 47.32 115.43 2,820.38 2,750.10 -344.71 647.96 5,965,217.45 1,489,905.15 3.42 733.64 MWD+IFR-AK-CAZ-SC(3) 3,103.13 50.50 117.13 2,882.83 2,812.55 -376.44 712.16 5,965,184.44 1,489,968.70 3.61 805.14 MWD+IFR-AK-CAZ-SC(3) 3,197.52 53.49 119.35 2,940.95 2,870.67 -411.65 777.66 5,965,147.92 1,490,033.46 3.67 879.47 MWD+IFR-AK-CAZ-SC(3) 3,291.64 56.93 120.82 2,994.65 2,924.37 -450.41 844.51 5,965,107.83 1,490,099.52 3.87 956.75 MWD+IFR-AK-CAZ-SC(3) 3,385.92 60.47 122.40 3,043.62 2,973.34 -492.64 913.10 5,965,064.23 1,490,167.24 4.02 1,037.25 MWD+IFR-AK-CAZ-SC(3) 3,480.20 63.08 122.55 3,088.21 3,017.93 -537.24 983.17 5,965,018.23 1,490,236.39 2.77 1,120.21 MWD+IFR-AK-CAZ-SC(3) 3,574.10 65.58 121.83 3,128.88 3,058.60 -582.32 1,054.79 5,964,971.72 1,490,307.09 2.75 1,204.75 MWD+IFR-AK-CAZ-SC(3) 3,668.21 65.48 121.84 3,167.86 3,097.58 -627.50 1,127.56 5,964,925.09 1,490,378.93 0.11 1,290.34 MWD+IFR-AK-CAZ-SC(3) 3,762.57 66.12 122.24 3,206.54 3,136.26 -673.16 1,200.52 5,964,877.97 1,490,450.94 0.78 1,376.34 MWD+IFR-AK-CAZ-SC(3) 3,857.38 66.13 123.47 3,244.92 3,174.64 -720.19 1,273.34 5,964,829.49 1,490,522.81 1.19 1,462.90 MWD+IFR-AK-CAZ-SC(3) 3,950.33 65.93 124.85 3,282.68 3,212.40 -767.88 1,343.62 5,964,780.39 1,490,592.10 1.37 1,547.57 MWD+IFR-AK-CAZ-SC(3) 4,044.30 65.98 124.50 3,320.97 3,250.69 -816.70 1,414.20 5,964,730.17 1,490,661.68 0.34 1,633.05 MWD+IFR-AK-CAZ-SC(3) 4,138.39 66.02 124.74 3,359.24 3,288.96 -865.54 1,484.93 5,964,679.92 1,490,731.41 0.24 1,718.68 MWD+IFR-AK-CAZ-SC(3) 4,233.64 65.21 124.56 3,398.56 3,328.28 -914.86 1,556.30 5,964,629.17 1,490,801.76 0.87 1,805.11 MWD+IFR-AK-CAZ-SC(3) 4,328.19 65.41 121.55 3,438.07 3,367.79 -961.71 1,628.29 5,964,580.89 1,490,872.79 2.90 1,890.85 MWD+IFR-AK-CAZ-SC(3) 4,421.96 65.25 120.68 3,477.20 3,406.92 -1,005.74 1,701.24 5,964,535.40 1,490,944.84 0.86 1,976.03 MWD+IFR-AK-CAZ-SC(3) 6/22/2017 1:53:07PM Page 3 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: ConocoPhiliips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +NI-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 4,515.82 65.45 118.69 3,516.35 3,446.07 -1,047.99 1,775.35 5,964,491.68 1,491,018.07 1.94 2,061.33 MWD+IFR-AK-CAZ-SC(3) 4,609.24 65.37 117.86 3,555.23 3,484.95 -1,088.23 1,850.16 5,964,449.94 1,491,092.05 0.81 2,146.25 MWD+IFR-AK-CAZ-SC(3) 4,704.90 65.47 117.80 3,595.02 3,524.74 -1,128.84 1,927.09 5,964,407.79 1,491,168.14 0.12 2,233.20 MWD+IFR-AK-CAZ-SC(3) 4,799.97 65.60 117.53 3,634.39 3,564.11 -1,169.01 2,003.73 5,964,366.08 1,491,243.95 0.29 2,319.68 MWD+IFR-AK-CAZ-SC(3) 4,892.17 65.18 118.84 3,672.79 3,602.51 -1,208.60 2,077.61 5,964,325.02 1,491,317.02 1.37 2,403.48 MWD+IFR-AK-CAZ-SC(3) 4,984.27 65.38 119.69 3,711.30 3,641.02 -1,249.50 2,150.60 5,964,282.66 1,491,389.16 0.87 2,487.14 MWD+IFR-AK-CAZ-SC(3) 5,078.77 65.73 119.40 3,750.41 3,680.13 -1,291.92 2,225.44 5,964,238.75 1,491,463.13 0.46 2,573.16 MWD+IFR-AK-CAZ-SC(3) 5,173.62 65.75 118.22 3,789.38 3,719.10 -1,333.59 2,301.21 5,964,195.56 1,491,538.04 1.13 2,659.63 MWD+IFR-AK-CAZ-SC(3) 5,266.91 66.24 117.73 3,827.34 3,757.06 -1,373.57 2,376.47 5,964,154.08 1,491,612.47 0.71 2,744.81 MWD+IFR-AK-CAZ-SC(3) 5,360.46 66.45 116.21 3,864.87 3,794.59 -1,412.43 2,452.84 5,964,113.70 1,491,688.04 1.51 2,830.40 MWD+IFR-AK-CAZ-SC(3) 5,454.61 66.54 116.02 3,902.42 3,832.14 -1,450.43 2,530.36 5,964,074.14 1,491,764.77 0.21 2,916.58 MWD+IFR-AK-CAZ-SC(3) 5,547.91 66.56 117.44 3,939.55 3,869.27 -1,488.93 2,606.81 5,964,034.12 1,491,840.42 1.40 3,002.06 MWD+IFR-AK-CAZ-SC(3) 5,642.49 66.44 118.33 3,977.27 3,906.99 -1,529.50 2,683.47 5,963,992.02 1,491,916.25 0.87 3,088.75 MWD+IFR-AK-CAZ-SC(3) 5,736.57 66.47 119.22 4,014.85 3,944.57 -1,571.01 2,759.07 5,963,948.99 1,491,990.99 0.87 3,174.98 MWD+IFR-AK-CAZ-SC(3) 5,827.97 66.50 119.49 4,051.32 3,981.04 -1,612.10 2,832.11 5,963,906.45 1,492,063.19 0.27 3,258.79 MWD+IFR-AK-CAZ-SC(3) 5,922.64 66.37 119.40 4,089.17 4,018.89 -1,654.76 2,907.68 5,963,862.28 1,492,137.88 0.16 3,345.57 MWD+IFR-AK-CAZ-SC(3) 6,016.58 66.57 120.46 4,126.67 4,056.39 -1,697.73 2,982.32 5,963,817.82 1,492,211.63 1.06 3,431.69 MWD+IFR-AK-CAZ-SC(3) 6,111.44 66.40 121.50 4,164.52 4,094.24 -1,742.50 3,056.89 5,963,771.56 1,492,285.28 1.02 3,518.65 MWD+IFR-AK-CAZ-SC(3) 6,206.13 66.64 121.41 4,202.25 4,131.97 -1,787.82 3,130.98 5,963,724.76 1,492,358.44 0.27 3,605.46 MWD+IFR-AK-CAZ-SC(3) 6,299.83 66.39 121.85 4,239.59 4,169.31 -1,832.89 3,204.15 5,963,678.23 1,492,430.68 0.51 3,691.35 MWD+IFR-AK-CAZ-SC(3) 6,394.66 65.76 121.49 4,278.04 4,207.76 -1,878.40 3,277.93 5,963,631.25 1,492,503.52 0.75 3,777.97 MWD+IFR-AK-CAZ-SC(3) 6,488.51 65.43 120.38 4,316.82 4,246.54 -1,922.33 3,351.23 5,963,585.85 1,492,575.92 1.13 3,863.41 MWD+IFR-AK-CAZ-SC(3) 6,582.69 65.40 119.99 4,356.00 4,285.72 -1,965.39 3,425.26 5,963,541.31 1,492,649.06 0.38 3,949.05 MWD+IFR-AK-CAZ-SC(3) 6,677.49 65.25 119.38 4,395.58 4,325.30 -2,008.05 3,500.10 5,963,497.15 1,492,723.02 0.61 4,035.20 MWD+IFR-AK-CAZ-SC(3) 6,772.09 65.43 117.93 4,435.05 4,364.77 -2,049.28 3,575.54 5,963,454.42 1,492,797.61 1.41 4,121.15 MWD+IFR-AK-CAZ-SC(3) 6,865.63 65.50 117.01 4,473.90 4,403.62 -2,088.53 3,651.04 5,963,413.66 1,492,872.30 0.90 4,206.18 MWD+IFR-AK-CAZ-SC(3) 6,960.60 65.92 118.11 4,512.96 4,442.68 -2,128.58 3,727.78 5,963,372.08 1,492,948.21 1.14 4,292.69 MWD+IFR-AK-CAZ-SC(3) 7,054.41 65.87 117.03 4,551.28 4,481.00 -2,168.21 3,803.68 5,963,330.93 1,493,023.29 1.05 4,378.26 MWD+IFR-AK-CAZ-SC(3) 7,148.47 66.03 117.67 4,589.61 4,519.33 -2,207.68 3,879.97 5,963,289.94 1,493,098.77 0.64 4,464.08 MWD+IFR-AK-CAZ-SC(3) 7,243.58 66.19 118.79 4,628.13 4,557.85 -2,248.81 3,956.59 5,963,247.28 1,493,174.54 1.09 4,551.01 MWD+IFR-AK-CAZ-SC(3) 7,337.39 66.61 119.75 4,665.69 4,595.41 -2,290.84 4,031.58 5,963,203.75 1,493,248.66 1.04 4,636.97 MWD+IFR-AK-CAZ-SC(3) 7,431.42 66.50 120.46 4,703.10 4,632.82 -2,334.11 4,106.21 5,963,158.99 1,493,322.39 0.70 4,723.24 MWD+IFR-AK-CAZ-SC(3) 7,526.27 66.64 121.35 4,740.81 4,670.53 -2,378.81 4,180.88 5,963,112.80 1,493,396.15 0.87 4,810.25 MWD+IFR-AK-CAZ-SC(3) 7,620.32 66.41 122.87 4,778.28 4,708.00 -2,424.66 4,253.94 5,963,065.49 1,493,468.27 1.50 4,896.43 MWD+IFR-AK-CAZ-SC(3) 7,714.93 66.32 122.68 4,816.21 4,745.93 -2,471.58 4,326.82 5,963,017.11 1,493,540.18 0.21 4,982.97 MWD+IFR-AK-CAZ-SC(3) 7,808.66 66.28 121.68 4,853.89 4,783.61 -2,517.29 4,399.46 5,962,969.96 1,493,611.88 0.98 5,068.71 MWD+IFR-AK-CAZ-SC(3) 7,903.34 66.39 119.52 4,891.89 4,821.61 -2,561.43 4,474.10 5,962,924.33 1,493,685.61 2.09 5,155.41 MWD+IFR-AK-CAZ-SC(3) 7,998.36 66.40 118.48 4,929.94 4,859.66 -2,603.64 4,550.25 5,962,880.60 1,493,760.89 1.00 5,242.48 MWD+IFR-AK-CAZ-SC(3) 8,093.00 65.91 117.98 4,968.20 4,897.92 -2,644.58 4,626.51 5,962,838.13 1,493,836.31 0.71 5,329.01 MWD+IFR-AK-CAZ-SC(3) 8,186.18 65.34 117.70 5,006.66 4,936.38 -2,684.22 4,701.56 5,962,796.99 1,493,910.54 0.67 5,413.84 MWD+IFR-AK-CAZ-SC(3) 6/22/2017 1:53:07PM Page 4 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 8,280.66 65.35 117.35 5,046.07 4,975.79 -2,723.90 4,777.71 5,962,755.79 1,493,985.87 0.34 5,499.65 MWD+IFR-AK-CAZ-SC(3) 8,375.48 65.52 116.07 5,085.49 5,015.21 -2,762.66 4,854.74 5,962,715.49 1,494,062.10 1.24 5,585.77 MWD+IFR-AK-CAZ-SC(3) 8,470.22 65.44 117.09 5,124.81 5,054.53 -2,801.23 4,931.83 5,962,675.38 1,494,138.38 0.98 5,671.84 MWD+IFR-AK-CAZ-SC(3) 8,564.22 65.42 117.51 5,163.90 5,093.62 -2,840.44 5,007.79 5,962,634.65 1,494,213.54 0.41 5,757.26 MWD+IFR-AK-CAZ-SC(3) 8,658.87 65.54 117.13 5,203.18 5,132.90 -2,879.96 5,084.30 5,962,593.60 1,494,289.23 0.39 5,843.30 MWD+IFR-AK-CAZ-SC(3) 8,751.81 65.37 116.57 5,241.79 5,171.51 -2,918.15 5,159.73 5,962,553.91 1,494,363.87 0.58 5,927.74 MWD+IFR-AK-CAZ-SC(3) 8,846.18 65.84 118.36 5,280.77 5,210.49 -2,957.78 5,235.98 5,962,512.74 1,494,439.30 1.80 6,013.62 MWD+IFR-AK-CAZ-SC(3) 8,941.31 65.49 118.83 5,319.97 5,249.69 -2,999.27 5,312.09 5,962,469.74 1,494,514.55 0.58 6,100.28 MWD+IFR-AK-CAZ-SC(3) 9,035.98 66.20 118.94 5,358.71 5,288.43 -3,041.00 5,387.72 5,962,426.50 1,494,589.33 0.76 6,186.65 MWD+IFR-AK-CAZ-SC(3) 9,128.38 66.61 119.62 5,395.69 5,325.41 -3,082.41 5,461.58 5,962,383.61 1,494,662.33 0.81 6,271.32 MWD+IFR-AK-CAZ-SC(3) 9,222.00 66.47 121.23 5,432.96 5,362.68 -3,125.90 5,535.63 5,962,338.65 1,494,735.48 1.58 6,357.19 MWD+IFR-AK-CAZ-SC(3) 9,315.92 66.45 121.79 5,470.47 5,400.19 -3,170.90 5,609.04 5,962,292.18 1,494,807.96 0.55 6,443.25 MWD+IFR-AK-CAZ-SC(3) 9,408.74 66.38 121.77 5,507.61 5,437.33 -3,215.70 5,681.35 5,962,245.93 1,494,879.36 0.08 6,528.26 MWD+IFR-AK-CAZ-SC(3) 9,502.55 66.39 121.50 5,545.19 5,474.91 -3,260.78 5,754.53 5,962,199.39 1,494,951.61 0.26 6,614.16 MWD+IFR-AK-CAZ-SC(3) 9,597.09 66.41 121.98 5,583.04 5,512.76 -3,306.36 5,828.21 5,962,152.35 1,495,024.35 0.47 6,700.74 MWD+IFR-AK-CAZ-SC(3) 9,691.58 66.38 121.74 5,620.88 5,550.60 -3,352.06 5,901.75 5,962,105.18 1,495,096.95 0.23 6,787.26 MWD+IFR-AK-CAZ-SC(3) 9,785.26 66.44 120.19 5,658.37 5,588.09 -3,396.23 5,975.36 5,962,059.54 1,495,169.65 1.52 6,873.08 MWD+IFR-AK-CAZ-SC(3) 9,879.51 66.61 118.65 5,695.92 5,625.64 -3,438.69 6,050.66 5,962,015.57 1,495,244.07 1.51 6,959.53 MWD+IFR-AK-CAZ-SC(3) 9,973.79 66.55 118.53 5,733.39 5,663.11 -3,480.09 6,126.62 5,961,972.65 1,495,319.18 0.13 7,046.03 MWD+IFR-AK-CAZ-SC(3) 10,066.44 65.97 119.87 5,770.69 5,700.41 -3,521.46 6,200.65 5,961,929.80 1,495,392.36 1.46 7,130.83 MWD+IFR-AK-CAZ-SC(3) 10,161.22 66.07 119.43 5,809.21 5,738.93 -3,564.30 6,275.91 5,961,885.46 1,495,466.74 0.44 7,217.43 MWD+IFR-AK-CAZ-SC(3) 10,255.83 65.99 119.44 5,847.65 5,777.37 -3,606.79 6,351.20 5,961,841.47 1,495,541.15 0.09 7,303.88 MWD+IFR-AK-CAZ-SC(3) 10,350.32 65.85 119.79 5,886.20 5,815.92 -3,649.42 6,426.20 5,961,797.34 1,495,615.27 0.37 7,390.15 MWD+IFR-AK-CAZ-SC(3) 10,444.68 65.85 119.01 5,924.80 5,854.52 -3,691.69 6,501.21 5,961,753.58 1,495,689.41 0.75 7,476.25 MWD+IFR-AK-CAZ-SC(3) 10,538.98 65.94 117.89 5,963.32 5,893.04 -3,732.69 6,576.89 5,961,711.06 1,495,764.25 1.09 7,562.30 MWD+IFR-AK-CAZ-SC(3) 10,632.74 66.08 118.43 6,001.44 5,931.16 -3,773.12 6,652.41 5,961,669.12 1,495,838.93 0.55 7,647.93 MWD+IFR-AK-CAZ-SC(3) 10,727.62 65.95 119.06 6,040.01 5,969.73 -3,814.81 6,728.42 5,961,625.92 1,495,914.08 0.62 7,734.61 MWD+IFR-AK-CAZ-SC(3) 10,819.25 65.94 118.24 6,077.36 6,007.08 -3,854.92 6,801.85 5,961,584.33 1,495,986.68 0.82 7,818.27 MWD+IFR-AK-CAZ-SC(3) 10,913.44 65.89 119.22 6,115.80 6,045.52 -3,896.26 6,877.25 5,961,541.49 1,496,061.23 0.95 7,904.25 MWD+IFR-AK-CAZ-SC(3) 11,007.68 65.92 119.20 6,154.27 6,083.99 -3,938.24 6,952.34 5,961,498.01 1,496,135.45 0.04 7,990.27 MWD+IFR-AK-CAZ-SC(3) 11,101.82 65.86 118.46 6,192.73 6,122.45 -3,979.68 7,027.61 5,961,455.07 1,496,209.87 0.72 8,076.19 MWD+IFR-AK-CAZ-SC(3) 11,197.31 65.92 118.40 6,231.73 6,161.45 -4,021.17 7,104.26 5,961,412.04 1,496,285.66 0.09 8,163.33 MWD+IFR-AK-CAZ-SC(3) 11,291.96 65.97 117.94 6,270.31 6,200.03 -4,061.97 7,180.46 5,961,369.72 1,496,361.01 0.45 8,249.73 MWD+IFR-AK-CAZ-SC(3) 11,386.07 66.39 118.51 6,308.32 6,238.04 -4,102.69 7,256.31 5,961,327.49 1,496,436.03 0.71 8,335.80 MWD+IFR-AK-CAZ-SC(3) 11,481.39 66.45 118.11 6,346.45 6,276.17 -4,144.12 7,333.22 5,961,284.52 1,496,512.08 0.39 8,423.13 MWD+IFR-AK-CAZ-SC(3) 11,574.65 66.29 119.02 6,383.84 6,313.56 -4,184.97 7,408.26 5,961,242.17 1,496,586.28 0.91 8,508.56 MWD+IFR-AK-CAZ-SC(3) 11,668.96 66.42 118.83 6,421.66 6,351.38 -4,226.76 7,483.88 5,961,198.87 1,496,661.03 0.23 8,594.94 MWD+IFR-AK-CAZ-SC(3) 11,763.99 66.36 119.54 6,459.72 6,389.44 -4,269.22 7,559.90 5,961,154.89 1,496,736.18 0.69 8,682.01 MWD+IFR-AK-CAZ-SC(3) 11,857.95 66.36 119.68 6,497.40 6,427.12 -4,311.75 7,634.73 5,961,110.87 1,496,810.14 0.14 8,768.09 MWD+IFR-AK-CAZ-SC(3) 11,952.69 66.48 119.55 6,535.30 6,465.02 -4,354.66 7,710.22 5,961,066.45 1,496,884.74 0.18 8,854.92 MWD+IFR-AK-CAZ-SC(3) 6/22/2017 1:53:07PM Page 5 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual©70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 12,046.22 66.45 120.74 6,572.64 6,502.36 -4,397.72 7,784.37 5,961,021.91 1,496,958.00 1.17 8,940.66 MWD+IFR-AK-CAZ-SC(3) 12,140.19 66.43 120.20 6,610.21 6,539.93 -4,441.40 7,858.61 5,960,976.75 1,497,031.34 0.53 9,026.79 MWD+IFR-AK-CAZ-SC(3) 12,234.50 65.94 119.92 6,648.29 6,578.01 -4,484.61 7,933.29 5,960,932.04 1,497,105.13 0.59 9,113.07 MWD+IFR-AK-CAZ-SC(3) 12,328.29 65.78 122.06 6,686.65 6,616.37 -4,528.68 8,006.65 5,960,886.51 1,497,177.58 2.09 9,198.63 MWD+IFR-AK-CAZ-SC(3) 12,420.99 65.85 121.04 6,724.63 6,654.35 -4,572.92 8,078.71 5,960,840.83 1,497,248.74 1.01 9,283.14 MWD+IFR-AK-CAZ-SC(3) 12,516.42 65.92 120.24 6,763.62 6,693.34 -4,617.31 8,153.65 5,960,794.94 1,497,322.76 0.77 9,370.23 MWD+IFR-AK-CAZ-SC(3) 12,610.16 65.86 120.52 6,801.91 6,731.63 -4,660.59 8,227.47 5,960,750.20 1,497,395.68 0.28 9,455.79 MWD+IFR-AK-CAZ-SC(3) 12,710.15 66.18 121.14 6,842.55 6,772.27 -4,707.41 8,305.92 5,960,701.81 1,497,473.17 0.65 9,547.12 MWD+IFR-AK-CAZ-SC(4) 12,801.12 66.21 120.91 6,879.26 6,808.98 -4,750.31 8,377.24 5,960,657.49 1,497,543.61 0.23 9,630.33 MWD+IFR-AK-CAZ-SC(4) 12,892.95 66.15 121.75 6,916.35 6,846.07 -4,793.99 8,449.00 5,960,612.37 1,497,614.47 0.84 9,714.30 MWD+IFR-AK-CAZ-SC(4) 12,988.30 66.16 122.56 6,954.90 6,884.62 -4,840.40 8,522.83 5,960,564.49 1,497,687.35 0.78 9,801.43 MWD+IFR-AK-CAZ-SC(4) 13,082.95 66.22 122.77 6,993.11 6,922.83 -4,887.14 8,595.73 5,960,516.29. 1,497,759.28 0.21 9,887.90 MWD+IFR-AK-CAZ-SC(4) 13,176.69 66.23 123.28 7,030.90 6,960.62 -4,933.89 8,667.65 5,960,468.11 1,497,830.25 0.50 9,973.54 MWD+IFR-AK-CAZ-SC(4). 13,271.16 66.02 124.22 7,069.14 6,998.86 -4,981.88 8,739.48 5,960,418.68 1,497,901.09 0.94 10,059.70 MWD+IFR-AK-CAZ-SC(4) 13,366.06 66.03 124.19 7,107.70 7,037.42 -5,030.63 8,811.19 5,960,368.50 1,497,971.80 0.03 10,146.14 MWD+IFR-AK-CAZ-SC(4) 13,459.68 66.00 124.06 7,145.75 7,075.47 -5,078.61 8,882.00 5,960,319.11 1,498,041.62 0.13 10,231.42 MWD+IFR-AK-CAZ-SC(4) 13,553.48 67.42 123.06 7,182.84 7,112.56 -5,126.24 8,953.80 5,960,270.05 1,498,112.44 1.80 10,317.37 MWD+IFR-AK-CAZ-SC(4) 13,647.26 69.47 123.67 7,217.29 7,147.01 -5,174.21 9,026.64 5,960,220.63 1,498,184.29 2.27 10,404.41 MWD+IFR-AK-CAZ-SC(4) 13,741.76 70.61 127.33 7,249.56 7,179.28 -5,225.78 9,098.93 5,960,167.61 1,498,255.53 3.83 10,492.75 MWD+IFR-AK-CAZ-SC(4) 13,836.07 71.75 129.94 7,279.99 7,209.71 -5,281.52 9,168.65 5,960,110.49 1,498,324.10 2.88 10,580.91 MWD+IFR-AK-CAZ-SC(4) 13,930.32 73.24 133.45 7,308.35 7,238.07 -5,341.30 9,235.74 5,960,049.37 1,498,389.98 3.89 10,668.80 MWD+IFR-AK-CAZ-SC(4) 14,024.65 73.73 134.67 7,335.16 7,264.88 -5,404.19 9,300.73 5,959,985.19 1,498,453.68 1.34 10,756.39 MWD+IFR-AK-CAZ-SC(4) 14,118.08 74.47 136.74 7,360.76 7,290.48 -5,468.50 9,363.47 5,959,919.63 1,498,515.11 2.27 10,842.73 MWD+IFR-AK-CAZ-SC(4) 14,213.13 75.55 139.49 7,385.35 7,315.07 -5,536.86 9,424.76 5,959,850.07 1,498,575.01 3.02 10,929.81 MWD+IFR-AK-CAZ-SC(4) 14,307.40 76.12 141.39 7,408.42 7,338.14 -5,607.32 9,482.97 5,959,778.45 1,498,631.78 2.05 11,015.26 MWD+IFR-AK-CAZ-SC(4) 14,401.35 77.45 144.16 7,429.90 7,359.62 -5,680.14 9,538.29 5,959,704.53 1,498,685.62 3.20 11,099.36 MWD+IFR-AK-CAZ-SC(4) 14,495.74 78.51 146.18 7,449.56 7,379.28 -5,755.92 9,591.01 5,959,627.72 1,498,736.80 2.38 11,182.67 MWD+IFR-AK-CAZ-SC(4) 14,590.65 80.46 147.99 7,466.88 7,396.60 -5,834.25 9,641.71 5,959,548.38 1,498,785.91 2.78 11,265.49 MWD+IFR-AK-CAZ-SC(4) 14,684.00 82.99 146.87 7,480.32 7,410.04 -5,912.09 9,691.44 5,959,469.56 1,498,834.05 2.96 11,347.22 MWD+IFR-AK-CAZ-SC(4) 14,777.45 82.87 147.40 7,491.82 7,421.54 -5,989.99 9,741.76 5,959,390.68 1,498,882.80 0.58 11,429.49 MWD+IFR-AK-CAZ-SC(4) 14,872.28 82.99 147.77 7,503.49 7,433.21 -6,069.44 9,792.21 5,959,310.24 1,498,931.63 0.41 11,512.64 MWD+IFR-AK-CAZ-SC(4) 14,967.00 83.18 147.28 7,514.89 7,444.61 -6,148.76 9,842.70 5,959,229.92 1,498,980.51 0.55 11,595.76 MWD+IFR-AK-CAZ-SC(4) 15,061.18 83.84 148.58 7,525.54 7,455.26 -6,228.06 9,892.38 5,959,149.64 1,499,028.58 1.54 11,678.17 MWD+IFR-AK-CAZ-SC(4) 15,155.45 83.85 150.84 7,535.65 7,465.37 -6,308.98 9,939.65 5,959,067.79 1,499,074.21 2.38 11,759.29 MWD+IFR-AK-CAZ-SC(4) 15,250.30 84.43 151.32 7,545.33 7,475.05 -6,391.57 9,985.28 5,958,984.30 1,499,118.16 0.79 11,839.80 MWD+IFR-AK-CAZ-SC(4) 15,344.66 85.02 152.61 7,554.01 7,483.73 -6,474.50 10,029.44 5,958,900.51 1,499,160.64 1.50 11,919.21 MWD+IFR-AK-CAZ-SC(4) 15,439.04 84.79 152.15 7,562.39 7,492.11 -6,557.80 10,073.02 5,958,816.36 1,499,202.54 0.54 11,998.30 MWD+IFR-AK-CAZ-SC(4) 15,533.83 83.93 152.86 7,571.71 7,501.43 -6,641.47 10,116.57 5,958,731.83 1,499,244.39 1.17 12,077.54 MWD+IFR-AK-CAZ-SC(4) 15,628.12 83.59 152.60 7,581.95 7,511.67 -6,724.79 10,159.52 5,958,647.67 1,499,285.65 0.45 12,156.09 MWD+IFR-AK-CAZ-SC(4) 15,722.90 83.51 152.19 7,592.60 7,522.32 -6,808.25 10,203.16 5,958,563.36 1,499,327.59 0.44 12,235.30 MWD+IFR-AK-CAZ-SC(4) 6/22/2017 1:53:07PM Page 6 COMPASS 5000.1 Build 74 • II is Definitive Survey Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100) (ft) Survey Tool Name 15,781.33 83.74 152.15 7,599.09 7,528.81 -6,859.60 10,230.27 5,958,511.48 1,499,353.66 0.40 12,284.27 MWD+IFR-AK-CAZ-SC(4) 15,831.00 84.14 151.08 7,604.33 7,534.05 -6,903.05 10,253.75 5,958,467.56 1,499,376.26 2.29 12,326.17 NOT an Actual Survey 7-5/8"x 10-1/2" 15,875.88 84.50 150.11 7,608.78 7,538.50 -6,941.96 10,275.67 5,958,428.23 1,499,397.40 2.29 12,364.48 MWD+IFR-AK-CAZ-SC(5) 15,970.67 86.42 150.13 7,616.28 7,546.00 -7,023.88 10,322.75 5,958,345.37 1,499,442.81 2.03 12,445.92 MWD+IFR-AK-CAZ-SC(5) 16,065.16 89.96 151.18 7,619.26 7,548.98 -7,106.19 10,369.02 5,958,262.15 1,499,487.42 3.91 12,526.86 MWD+IFR-AK-CAZ-SC(5) 16,160.57 91.60 150.50 7,617.97 7,547.69 -7,189.50 10,415.50 5,958,177.94 1,499,532.21 1.86 12,608.47 MWD+IFR-AK-CAZ-SC(5) 16,255.35 91.27 150.32 7,615.59 7,545.31 -7,271.89 10,462.29 5,958,094.62 1,499,577.32 0.40 12,689.90 MWD+IFR-AK-CAZ-SC(5) 16,350.12 90.55 150.19 7,614.09 7,543.81 -7,354.17 10,509.30 5,958,011.43 1,499,622.67 0.77 12,771.46 MWD+IFR-AK-CAZ-SC(5) 16,444.57 89.76 149.53 7,613.83 7,543.55 -7,435.85 10,556.73 5,957,928.82 1,499,668.43 1.09 12,853.08 MWD+IFR-AK-CAZ-SC(5) 16,539.10 89.66 150.46 7,614.31 7,544.03 -7,517.70 10,604.00 5,957,846.03 1,499,714.04 0.99 12,934.66 MWD+IFR-AK-CAZ-SC(5) 16,634.15 89.53 151.51 7,614.98 7,544.70 -7,600.82 10,650.10 5,957,762.01 1,499,758.46 1.11 13,015.85 MWD+IFR-AK-CAZ-SC(5) 16,728.82 89.53 151.57 7,615.76 7,545.48 -7,684.05 10,695.21 5,957,677.89 1,499,801.88 0.06 13,096.23 MWD+IFR-AK-CAZ-SC(5) 16,823.52 89.83 152.31 7,616.29 7,546.01 -7,767.61 10,739.76 5,957,593.45 1,499,844.74 0.84 13,176.29 MWD+IFR-AK-CAZ-SC(5) 16,918.44 89.59 153.72 7,616.77 7,546.49 -7,852.20 10,782.83 5,957,508.03 1,499,886.09 1.51 13,255.57 MWD+IFR-AK-CAZ-SC(5) 17,014.02 89.73 153.52 7,617.33 7,547.05 -7,937.82 10,825.30 5,957,421.57 1,499,926.82 0.26 13,334.84 MWD+IFR-AK-CAZ-SC(5) 17,109.42 89.42 154.28 7,618.04 7,547.76 -8,023.49 10,867.26 5,957,335.08 1,499,967.05 0.86 13,413.70 MWD+IFR-AK-CAZ-SC(5) 17,204.34 89.49 155.69 7,618.94 7,548.66 -8,109.50 10,907.40 5,957,248.29 1,500,005.45 1.49 13,491.13 MWD+IFR-AK-CAZ-SC(5) 17,299.71 89.42 155.32 7,619.85 7,549.57 -8,196.28 10,946.94 5,957,160.73 1,500,043.23 0.39 13,568.43 MWD+IFR-AK-CAZ-SC(5) 17,395.44 89.63 154.79 7,620.65 7,550.37 -8,283.08 10,987.31 5,957,073.15 1,500,081.84 0.60 13,646.46 MWD+IFR-AK-CAZ-SC(5) 17,490.52 89.70 154.71 7,621.20 7,550.92 -8,369.07 11,027.87 5,956,986.36 1,500,120.66 0.11 13,724.25 MWD+IFR-AK-CAZ-SC(5) 17,585.67 89.42 155.31 7,621.93 7,551.65 -8,455.31 11,068.06 5,956,899.34 1,500,159.11 0.70 13,801.85 MWD+IFR-AK-CAZ-SC(5) 17,680.69 89.46 154.71 7,622.86 7,552.58 -8,541.43 11,108.20 5,956,812.43 1,500,197.50 0.63 13,879.34 MWD+IFR-AK-CAZ-SC(5) 17,775.95 89.97 153.12 7,623.33 7,553.05 -8,626.99 11,150.09 5,956,726.06 1,500,237.65 1.75 13,958.07 MWD+IFR-AK-CAZ-SC(5) 17,871.22 89.66 152.81 7,623.64 7,553.36 -8,711.85 11,193.39 5,956,640.35 1,500,279.24 0.46 14,037.69 MWD+IFR-AK-CAZ-SC(5) 17,966.20 89.73 151.63 7,624.15 7,553.87 -8,795.88 11,237.66 5,956,555.46 1,500,321.80 1.24 14,117.73 MWD+IFR-AK-CAZ-SC(5) 18,061.50 89.70 150.43 7,624.62 7,554.34 -8,879.25 11,283.82 5,956,471.18 1,500,366.26 1.26 14,199.09 MWD+IFR-AK-CAZ-SC(5) 18,156.90 89.77 148.92 7,625.06 7,554.78 -8,961.59 11,331.98 5,956,387.89 1,500,412.76 1.58 14,281.69 MWD+IFR-AK-CAZ-SC(5) 18,251.61 89.56 147.97 7,625.62 7,555.34 -9,042.30 11,381.54 5,956,306.21 1,500,460.68 1.03 14,364.69 MWD+IFR-AK-CAZ-SC(5) 18,347.36 89.42 148.49 7,626.47 7,556.19 -9,123.70 11,431.95 5,956,223.81 1,500,509.44 0.56 14,448.77 MWD+IFR-AK-CAZ-SC(5) 18,442.64 89.28 149.79 7,627.55 7,557.27 -9,205.48 11,480.82 5,956,141.07 1,500,556.65 1.37 14,531.71 MWD+IFR-AK-CAZ-SC(5) 18,538.38 89.87 149.54 7,628.26 7,557.98 -9,288.11 11,529.18 5,956,057.49 1,500,603.33 0.67 14,614.61 MWD+IFR-AK-CAZ-SC(5) 18,634.14 89.90 150.67 7,628.45 7,558.17 -9,371.13 11,576.90 5,955,973.54 1,500,649.37 1.18 14,697.16 MWD+IFR-AK-CAZ-SC(5) 18,728.69 89.66 152.32 7,628.82 7,558.54 -9,454.21 11,622.02 5,955,889.57 1,500,692.81 1.76 14,777.48 MWD+IFR-AK-CAZ-SC(5) 18,824.48 90.04 152.91 7,629.07 7,558.79 -9,539.26 11,666.08 5,955,803.65 1,500,735.14 0.73 14,857.85 MWD+IFR-AK-CAZ-SC(5) 18,920.06 89.94 153.04 7,629.08 7,558.80 -9,624.41 11,709.51 5,955,717.65 1,500,776.84 0.17 14,937.72 MWD+IFR-AK-CAZ-SC(5) 19,015.38 89.94 155.22 7,629.18 7,558.90 -9,710.17 11,751.10 5,955,631.08 1,500,816.70 2.29 15,016.29 MWD+IFR-AK-CAZ-SC(5) 19,110.56 89.77 156.53 7,629.42 7,559.14 -9,797.03 11,790.00 5,955,543.45 1,500,853.84 1.39 15,093.08 MWD+IFR-AK-CAZ-SC(5) 19,205.89 90.08 156.20 7,629.55 7,559.27 -9,884.37 11,828.22 5,955,455.38 1,500,890.29 0.47 15,169.50 MWD+IFR-AK-CAZ-SC(5) 19,300.98 90.08 156.34 7,629.42 7,559.14 -9,971.42 11,866.49 5,955,367.58 1,500,926.79 0.15 15,245.82 MWD+IFR-AK-CAZ-SC(5) 19,396.02 90.14 158.16 7,629.23 7,558.95 -10,059.06 11,903.24 5,955,279.22 1,500,961.77 1.92 15,321.12 MWD+IFR-AK-CAZ-SC(5) 6/22/2017 1:53:07PM Page 7 COMPASS 5000.1 Build 74 • Definitive Survey Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +NI-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 19,491.43 90.32 156.18 7,628.85 7,558.57 -10,146.99 11,940.26 5,955,190.57 1.500,997.00 2.08 15,396.80 MWD+IFR-AK-CAZ-SC(5) 19,586.58 90.93 154.42 7,627.81 7,557.53 -10,233.43 11,980.01 5,955,103.36 1,501,035.01 1.96 15,474.11 MWD+IFR-AK-CAZ-SC(5) 19,680.92 91.00 153.87 7,626.22 7,555.94 -10,318.31 12,021.15 5,955,017.67 1,501,074.42 0.59 15,551.86 MWD+IFR-AK-CAZ-SC(5) 19,777.36 90.13 153.78 7,625.27 7,554.99 -10,404.86 12,063.69 5,954,930.29 1,501,115.21 0.91 15,631.64 MWD+IFR-AK-CAZ-SC(5) 19,872.23 90.35 152.78 7,624.88 7,554.60 -10,489.59 12,106.34 5,954,844.72 1,501,156.15 1.08 15,710.64 MWD+IFR-AK-CAZ-SC(5) 19,967.07 90.52 151.71 7,624.16 7,553.88 -10,573.52 12,150.51 5,954,759.93 1,501,198.61 1.14 15,790.54 MWD+IFR-AK-CAZ-SC(5) 20,062.15 90.01 151.57 7,623.72 7,553.44 -10,657.19 12,195.67 5,954,675.38 1,501,242.08 0.56 15,871.19 MWD+IFR-AK-CAZ-SC(5) 20,157.10 90.02 149.90 7,623.69 7,553.41 -10,740.01 12,242.08 5,954,591.64 1,501,286.81 1.76 15,952.50 MWD+IFR-AK-CAZ-SC(5) 20,252.26 88.70 150.47 7,624.75 7,554.47 -10,822.57 12,289.39 5,954,508.15 1,501,332.45 1.51 16,034.46 MWD+IFR-AK-CAZ-SC(5) 20,347.63 86.72 151.35 7,628.56 7,558.28 -10,905.84 12,335.72 5,954,423.97 1,501,377.08 2.27 16,115.92 MWD+IFR-AK-CAZ-SC(5) 20,443.91 86.95 150.81 7,633.88 7,563.60 -10,989.98 12,382.21 5,954,338.91 1,501,421.87 0.61 16,197.95 MWD+IFR-AK-CAZ-SC(5) 20,538.71 87.09 149.44 7,638.81 7,568.53 -11,072.07 12,429.37 5,954,255.90 1,501,467.36 1.45 16,279.55 MWD+IFR-AK-CAZ-SC(5) 20,634.16 86.92 148.96 7,643.80 7,573.52 -11,153.95 12,478.17 5,954,173.06 1,501,514.50 0.53 16,362.47 MWD+IFR-AK-CAZ-SC(5) 20,730.29 87.19 146.33 7,648.74 7,578.46 -11,235.04 12,529.55 5,954,090.96 1,501,564.23 2.75 16,447.24 MWD+IFR-AK-CAZ-SC(5) 20,824.53 87.23 147.27 7,653.32 7,583.04 -11,313.80 12,581.09 5,954,011.18 1,501,614.17 1.00 16,531.00 MWD+IFR-AK-CAZ-SC(5) 20,877.83 87.19 147.93 7,655.92 7,585.64 -11,358.75 12,609.61 5,953,965.67 1,501,641.78 1.24 16,578.03 MWD+IFR-AK-CAZ-SC(5) 20,919.40 87.19 148.02 7,657.96 7,587.68 -11,393.95 12,631.63 5,953,930.04 1,501,663.09 0.22 16,614.58 MWD+IFR-AK-CAZ-SC(5) 20,963.25 87.26 148.49 7,660.08 7,589.80 -11,431.20 12,654.67 5,953,892.34 1,501,685.37 1.08 16,653.03 MWD+IFR-AK-CAZ-SC(5) 21,015.41 87.30 149.66 7,662.55 7,592.27 -11,475.89 12,681.45 5,953,847.12 1,501,711.24 2.24 16,698.41 MWD+IFR-AK-CAZ-SC(5) 21,065.30 87.23 148.54 7,664.93 7,594.65 -11,518.65 12,707.04 5,953,803.85 1,501,735.97 2.25 16,741.81 MWD+IFR-AK-CAZ-SC(5) 21,111.05 87.23 148.45 7,667.15 7,596.87 -11,557.61 12,730.92 5,953,764.42 1,501,759.05 0.20 16,781.84 MWD+IFR-AK-CAZ-SC(5) 21,158.50 87.21 149.21 7,669.45 7,599.17 -11,598.16 12,755.45 5,953,723.39 1,501,782.76 1.60 16,823.22 MWD+IFR-AK-CAZ-SC(5) 21,166.00 87.35 149.08 7,669.80 7,599.52 -11,604.59 12,759.29 5,953,716.88 1,501,786.47 2.55 16,829.74 NOT an Actual Survey 4 1/2"x 6 3/4" 21,206.22 88.12 148.40 7,671.39 7,601.11 -11,638.95 12,780.15 5,953,682.12 1,501,806.63 2.55 16,864.86 MWD+IFR-AK-CAZ-SC(5) 21,255.42 88.84 148.92 7,672.70 7,602.42 -11,680.96 12,805.73 5,953,639.61 1,501,831.36 1.80 16,907.87 MWD+IFR-AK-CAZ-SC(5) 21,301.24 89.18 148.81 7,673.49 7,603.21 -11,720.17 12,829.41 5,953,599.93 1,501,854.25 0.78 16,947.86 MWD+IFR-AK-CAZ-SC(5) 21,349.46 89.66 150.29 7,673.98 7,603.70 -11,761.73 12,853.85 5,953,557.88 1,501,877.84 3.23 16,989.66 MWD+IFR-AK-CAZ-SC(5) 21,396.35 89.80 150.12 7,674.20 7,603.92 -11,802.43 12,877.15 5,953,516.73 1,501,900.31 0.47 17,030.04 MWD+IFR-AK-CAZ-SC(5) 21,443.09 89.92 151.41 7,674.31 7,604.03 -11,843.21 12,899.98 5,953,475.50 1,501,922.31 2.77 17,070.06 MWD+IFR-AK-CAZ-SC(5) 21,491.42 90.71 152.40 7,674.05 7,603.77 -11,885.84 12,922.74 5,953,432.42 1,501,944.21 2.62 17,110.93 MWD+IFR-AK-CAZ-SC(5) 21,532.54 90.45 153.58 7,673.63 7,603.35 -11,922.48 12,941.41 5,953,395.42 1,501,962.14 2.94 17,145.28 MWD+IFR-AK-CAZ-SC(5) 21,586.14 90.42 152.66 7,673.22 7,602.94 -11,970.28 12,965.64 5,953,347.14 1,501,985.40 1.72 17,189.99 MWD+IFR-AK-CAZ-SC(5) 21,682.11 90.49 152.35 7,672.46 7,602.18 -12,055.41 13,009.95 5,953,261.14 1,502,027.98 0.33 17,270.61 MWD+IFR-AK-CAZ-SC(5) 21,777.09 90.66 151.23 7,671.51 7,601.23 -12,139.10 13,054.84 5,953,176.57 1,502,071.18 1.19 17,351.04 MWD+IFR-AK-CAZ-SC(5) 21,871.36 90.45 153.47 7,670.59 7,600.31 -12,222.60 13,098.58 5,953,092.22 1,502,113.23 2.39 17,430.36 MWD+IFR-AK-CAZ-SC(5) 21,966.69 90.69 152.55 7,669.64 7,599.36 -12,307.54 13,141.85 5,953,006.43 1,502,154.77 1.00 17,509.98 MWD+IFR-AK-CAZ-SC(5) 22,061.58 89.94 153.43 7,669.12 7,598.84 -12,392.08 13,184.94 5,952,921.05 1,502,196.15 1.22 17,589.26 MWD+IFR-AK-CAZ-SC(5) 22,156.80 89.49 153.00 7,669.60 7,599.32 -12,477.08 13,227.85 5,952,835.21 1,502,237.33 0.65 17,668.60 MWD+IFR-AK-CAZ-SC(5) 22,251.84 89.15 152.74 7,670.72 7,600.44 -12,561.66 13,271.18 5,952,749.78 1,502,278.96 0.45 17,748.11 MWD+IFR-AK-CAZ-SC(5) 6/22/2017 1.53:07PM Page 8 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 22,347.46 88.69 152.67 7,672.53 7,602.25 -12,646.62 13,315.02 5,952,663.96 1,502,321.07 0.49 17,828.24 MWD+IFR-AK-CAZ-SC(5) 22,442.54 88.98 153.05 7,674.46 7,604.18 -12,731.21 13,358.39 5,952,578.52 1,502,362.72 0.50 17,907.78 MWD+IFR-AK-CAZ-SC(5) 22,537.71 89.18 152.48 7,675.99 7,605.71 -12,815.82 13,401.94 5,952,493.06 1,502,404.56 0.63 17,987.49 MWD+IFR-AK-CAZ-SC(5) 22,633.37 88.60 152.84 7,677.84 7,607.56 -12,900.78 13,445.86 5,952,407.24 1,502,446.76 0.71 18,067.69 MWD+IFR-AK-CAZ-SC(5) 22,728.34 88.26 153.02 7,680.44 7,610.16 -12,985.31 13,489.06 5,952,321.86 1,502,488.25 0.41 18,147.06 MWD+IFR-AK-CAZ-SC(5) 22,823.57 88.25 154.59 7,683.34 7,613.06 -13,070.72 13,531.08 5,952,235.63 1,502,528.53 1.65 18,225.83 MWD+IFR-AK-CAZ-SC(5) 22,918.53 89.15 154.70 7,685.50 7,615.22 -13,156.51 13,571.73 5,952,149.05 1,502,567.45 0.95 18,303.61 MWD+IFR-AK-CAZ-SC(5) 23,013.05 89.80 153.92 7,686.36 7,616.08 -13,241.68 13,612.71 5,952,063.07 1,502,606.70 1.07 18,381.35 MWD+IFR-AK-CAZ-SC(5) 23,108.26 89.70 153.34 7,686.78 7,616.50 -13,326.98 13,654.99 5,951,976.94 1,502,647.25 0.62 18,460.31 MWD+IFR-AK-CAZ-SC(5) 23,203.78 89.70 154.18 7,687.28 7,617.00 -13,412.66 13,697.22 5,951,890.44 1,502,687.75 0.88 18,539.40 MWD+IFR-AK-CAZ-SC(5) 23,299.09 89.59 153.20 7,687.87 7,617.59 -13,498.09 13,739.47 5,951,804.18 1,502,728.26 1.03 18,618.38 MWD+IFR-AK-CAZ-SC(5) 23,395.24 89.73 152.52 7,688.44 7,618.16 -13,583.65 13,783.33 5,951,717.76 1,502,770.39 0.72 18,698.83 MWD+IFR-AK-CAZ-SC(5) 23,488.94 89.80 153.75 7,688.83 7,618.55 -13,667.24 13,825.67 5,951,633.35 1,502,811.03 1.31 18,776.98 MWD+IFR-AK-CAZ-SC(5) 23,584.64 89.70 154.35 7,689.24 7,618.96 -13,753.29 13,867.54 5,951,546.48 1,502,851.17 0.64 18,855.94 MWD+IFR-AK-CAZ-SC(5) 23,679.33 89.83 155.18 7,689.63 7,619.35 -13,838.94 13,907.91 5,951,460.04 1,502,889.80 0.89 18,933.40 MWD+IFR-AK-CAZ-SC(5) 23,774.35 89.73 154.63 7,690.00 7,619.72 -13,924.99 13,948.21 5,951,373.20 1,502,928.35 0.59 19,011.00 MWD+IFR-AK-CAZ-SC(5) 23,869.77 89.10 153.80 7,690.97 7,620.69 -14,010.90 13,989.72 5,951,286.47 1,502,968.12 1.09 19,089.58 MWD+IFR-AK-CAZ-SC(5) 23,964.07 89.80 155.15 7,691.88 7,621.60 -14,095.99 14,030.35 5,951,200.59 1,503,007.03 1.61 19,166.98 MWD+IFR-AK-CAZ-SC(5) 24,061.01 89.87 153.32 7,692.15 7,621.87 -14,183.29 14,072.48 5,951,112.47 1,503,047.39 1.89 19,246.79 MWD+IFR-AK-CAZ-SC(5) 24,155.80 90.38 153.72 7,691.95 7,621.67 -14,268.13 14,114.75 5,951,026.80 1,503,087.94 0.68 19,325.50 MWD+IFR-AK-CAZ-SC(5) 24,251.86 90.36 152.87 7,691.33 7,621.05 -14,353.94 14,157.92 5,950,940.14 1,503,129.37 0.89 19,405.47 MWD+IFR-AK-CAZ-SC(5) 24,346.04 91.91 153.03 7,689.46 7,619.18 -14,437.80 14,200.74 5,950,855.44 1,503,170.49 1.65 19,484.18 MWD+IFR-AK-CAZ-SC(5) 24,441.81 91.73 152.08 7,686.42 7,616.14 -14,522.75 14,244.85 5,950,769.63 1,503,212.88 1.01 19,564.54 MWD+IFR-AK-CAZ-SC(5) 24,537.42 90.32 151.32 7,684.71 7,614.43 -14,606.92 14,290.17 5,950,684.57 1,503,256.49 1.68 19,645.57 MWD+IFR-AK-CAZ-SC(5) 24,633.14 88.74 151.78 7,685.50 7,615.22 -14,691.07 14,335.77 5,950,599.53 1,503,300.38 1.72 19,726.83 MWD+IFR-AK-CAZ-SC(5) 24,728.33 89.61 150.56 7,686.87 7,616.59 -14,774.45 14,381.67 5,950,515.24 1,503,344.59 1.57 19,807.97 MWD+IFR-AK-CAZ-SC(5) 24,823.64 88.26 150.08 7,688.64 7,618.36 -14,857.24 14,428.85 5,950,431.53 1,503,390.09 1.50 19,889.94 MWD+IFR-AK-CAZ-SC(5) 24,918.83 87.35 150.20 7,692.28 7,622.00 -14,939.73 14,476.21 5,950,348.11 1,503,435.78 0.96 19,971.91 MWD+IFR-AK-CAZ-SC(5) 25,014.62 87.32 149.37 7,696.74 7,626.46 -15,022.42 14,524.36 5,950,264.47 1,503,482.25 0.87 20,054.66 MWD+IFR-AK-CAZ-SC(5) 25,109.55 88.39 150.26 7,700.29 7,630.01 -15,104.42 14,572.06 5,950,181.54 1,503,528.29 1.47 20,136.68 MWD+IFR-AK-CAZ-SC(5) 25,205.31 88.87 152.20 7,702.58 7,632.30 -15,188.33 14,618.13 5,950,096.72 1,503,572.66 2.09 20,218.24 MWD+IFR-AK-CAZ-SC(5) 25,300.68 89.39 151.60 7,704.03 7,633.75 -15,272.45 14,663.05 5,950,011.72 1,503,615.87 0.83 20,298.89 MWD+IFR-AK-CAZ-SC(5) 25,395.98 89.32 150.87 7,705.10 7,634.82 -15,355.98 14,708.90 5,949,927.29 1,503,660.03 0.77 20,380.07 MW0+IFR-AK-CAZ-SC(5) 25,491.25 88.65 150.43 7,706.79 7,636.51 -15,439.01 14,755.59 5,949,843.34 1,503,705.03 0.84 20,461.72 MWD+IFR-AK-CAZ-SC(5) 25,585.52 89.59 151.82 7,708.24 7,637.96 -15,521.55 14,801.11 5,949,759.91 1,503,748.87 1.78 20,542.11 MWD+IFR-AK-CAZ-SC(5) 25,681.54 89.77 151.03 7,708.77 7,638.49 -15,605.87 14,847.03 5,949,674.69 1,503,793.09 0.84 20,623.75 MWD+IFR-AK-CAZ-SC(5) 25,777.03 89.46 151.84 7,709.41 7,639.13 -15,689.73 14,892.69 5,949,589.93 1,503,837.05 0.91 20,704.92 MWD+IFR-AK-CAZ-SC(5) 25,873.49 89.29 149.53 7,710.47 7,640.19 -15,773.83 14,939.91 5,949,504.91 1,503,882.56 2.40 20,787.56 MWD+IFR-AK-CAZ-SC(5) 25,967.29 88.45 149.88 7,712.32 7,642.04 -15,854.80 14,987.22 5,949,423.00 1,503,928.23 0.97 20,868.74 MW0+IFR-AK-CAZ-SC(5) 26,062.64 89.15 148.26 7,714.31 7,644.03 -15,936.57 15,036.22 5,949,340.27 1,503,975.56 1.85 20,951.77 MWD+IFR-AK-CAZ-SC(5) 6/22/2017 1:53:07PM Page 9 COMPASS 5000.1 Build 74 • • Definitive Survey Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-17 Project: Western North Slope TVD Reference: CD5-17 actual @ 70.28usft(D19) Site: CD5 Alpine West Pad MD Reference: CD5-17 actual @ 70.28usft(D19) Well: CD5-17 North Reference: True Wellbore: CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 26,157.64 89.77 148.27 7,715.21 7,644.93 -16,017.36 15,086.18 5,949,258.49 1,504,023.89 0.65 21,035.17 MWD+IFR-AK-CAZ-SC(5) 26,252.63 89.77 147.74 7,715.59 7,645.31 -16,097.92 15,136.51 5,949,176.94 1,504,072.59 0.56 21,118.77 MWD+IFR-AK-CAZ-SC(5) 26,348.22 89.66 149.54 7,716.07 7,645.79 -16,179.55 15,186.26 5,949,094.34 1,504,120.67 1.89 21,202.38 MWD+IFR-AK-CAZ-SC(5) 26,442.73 89.70 149.36 7,716.59 7,646.31 -16,260.93 15,234.29 5,949,012.01 1,504,167.06 0.20 21,284.39 MWD+IFR-AK-CAZ-SC(5) 26,538.16 89.14 149.08 7,717.56 7,647.28 -16,342.92 15,283.13 5,948,929.07 1,504,214.23 0.66 21,367.39 MWD+IFR-AK-CAZ-SC(5) 26,633.78 89.56 149.49 7,718.64 7,648.36 -16,425.12 15,331.96 5,948,845.91 1,504,261.40 0.61 21,450.50 MWD+IFR-AK-CAZ-SC(5) 26,728.55 89.73 149.67 7,719.23 7,648.95 -16,506.84 15,379.95 5,948,763.24 1,504,307.72 0.26 21,532.64 MWD+IFR-AK-CAZ-SC(5) 26,824.03 89.48 149.52 7,719.89 7,649.61 -16,589.19 15,428.27 5,948,679.94 1,504,354.37 0.31 21,615.37 MWD+IFR-AK-CAZ-SC(5) 26,919.11 90.25 150.58 7,720.11 7,649.83 -16,671.57 15,475.74 5,948,596.63 1,504,400.17 1.38 21,697.38 MWD+IFR-AK-CAZ-SC(5) 27,013.22 91.04 149.85 7,719.05 7,648.77 -16,753.24 15,522.48 5,948,514.04 1,504,445.26 1.14 21,778.41 MWD+IFR-AK-CAZ-SC(5) 27,109.37 92.42 150.75 7,716.15 7,645.87 -16,836.72 15,570.10 5,948,429.63 1,504,491.18 1.71 21,861.09 MWD+IFR-AK-CAZ-SC(5) 27,204.71 92.41 150.88 7,712.13 7,641.85 -16,919.88 15,616.55 5,948,345.55 1,504,535.94 0.14 21,942.61 MWD+IFR-AK-CAZ-SC(5) 27,299.78 92.34 152.81 7,708.19 7,637.91 -17,003.62 15,661.37 5,948,260.93 1,504,579.06 2.03 22,022.99 MWD+IFR-AK-CAZ-SC(5) 27,395.24 92.44 154.52 7,704.21 7,633.93 -17,089.10 15,703.67 5,948,174.63 1,504,619.64 1.79 22,102.05 MWD+IFR-AK-CAZ-SC(5) 27,490.67 92.51 155.65 7,700.09 7,629.81 -17,175.57 15,743.84 5,948,087.37 1,504,658.05 1.19 22,179.73 MWD+IFR-AK-CAZ-SC(5) 27,586.41 92.48 156.00 7,695.92 7,625.64 -17,262.83 15,783.01 5,947,999.35 1,504,695.45 0.37 22,256.95 MWD+IFR-AK-CAZ-SC(5) 27,681.79 92.51 155.14 7,691.77 7,621.49 -17,349.58 15,822.42 5,947,911.82 1,504,733.11 0.90 22,334.12 MWD+IFR-AK-CAZ-SC(5) 27,777.00 92.32 155.13 7,687.76 7,617.48 -17,435.89 15,862.42 5,947,824.73 1,504,771.36 0.20 22,411.58 MWD+IFR-AK-CAZ-SC(5) 27,871.79 93.41 153.99 7,683.02 7,612.74 -17,521.38 15,903.08 5,947,738.45 1,504,810.29 1.66 22,489.22 MWD+IFR-AK-CAZ-SC(5) 27,966.73 93.09 152.61 7,677.64 7,607.36 -17,606.06 15,945.67 5,947,652.94 1,504,851.16 1.49 22,568.12 MWD+IFR-AK-CAZ-SC(5) 28,062.35 92.46 152.20 7,673.01 7,602.73 -17,690.70 15,989.91 5,947,567.43 1,504,893.69 0.79 22,648.45 MWD+IFR-AK-CAZ-SC(5) 28,158.67 92.99 151.07 7,668.43 7,598.15 -17,775.36 16,035.62 5,947,481.87 1,504,937.68 1.29 22,730.06 MWD+IFR-AK-CAZ-SC(5) 28,252.86 92.96 151.30 7,663.54 7,593.26 -17,857.78 16,080.96 5,947,398.57 1,504,981.34 0.25 22,810.23 MWD+IFR-AK-CAZ-SC(5) 28,348.09 93.54 151.61 7,658.14 7,587.86 -17,941.29 16,126.39 5,947,314.16 1,505,025.08 0.69 22,891.04 MWD+IFR-AK-CAZ-SC(5) 28,443.09 93.47 152.32 7,652.34 7,582.06 -18,024.99 16,170.96 5,947,229.59 1,505,067.95 0.75 22,971.18 MWD+IFR-AK-CAZ-SC(5) 28,537.72 93.64 150.30 7,646.47 7,576.19 -18,107.84 16,216.30 5,947,145.85 1,505,111.61 2.14 23,051.57 MWD+IFR-AK-CAZ-SC(5) 28,585.18 93.51 151.37 7,643.51 7,573.23 -18,149.20 16,239.38 5,947,104.03 1,505,133.85 2.27 23,092.09 MWD+IFR-AK-CAZ-SC(5) 28,645.00 93.51 151.37 7,639.85 7,569.57 -18,201.61 16,267.99 5,947,051.07 1,505,161.40 0.00 23,142.88 PROJECTED to TD Final Definitive Survey Verified and Signed-off AC targets and/or well position objectives have been achieved. p yes p tic I have checked toffs but of my ability that the following data is correct: p Surface coordinates 9 Declination 8 Convergence O3 GRS Survey Corrections ID Survey Tool Codes SLB DE' gtaadlot./e Client Representative: /< -4 Date: 6/23/2017 6/22/2017 1:53:07PM Page 10 COMPASS 5000.1 Build 74 1110 P21. ^Gly Loepp, Victoria T (DOA) From: Loepp,Victoria T(DOA) Sent: Friday,June 02, 2017 10:03 AM To: Alexa, Kurt J Subject: RE: [EXTERNAL]RE:CRU CD5-17(PTD 217-017 Revised) Packer Setting Depth Waiver Kurt, Approval is granted to move the production packer to 13,720' MD. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp(a�alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loeoo@alaska.gov From:Alexa, Kurt J [mailto:Kurt.J.Alexa@conocophillips.com] Sent:Friday,June 02,2017 10:00 AM To: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov> Cc: Njoku,Johnson<Johnson.Njoku@conocophillips.com> Subject: RE: [EXTERNAL]RE: CRU CD5-17(PTD 217-017 Revised) Packer Setting Depth Waiver Victoria, Wanted to check with you on a move in our production packer setting depth for the CRU CD5-17 well. Completions has come back and requested to move the production packer up from "13,850' MD/7,284'TVD to—13,720' MD(7,242' TVD) in the CRU CD5-17 well. The top of cement in the 7-5/8" intermediate casing was up to 12,200' MD/6,634'ND. In your response earlier,you stated that we were approved for the 13,850' MD position of our production packer. Although the depth from top of cement to new production packer setting depth still exceeds the required 1,200' MD,as per permit, I felt that I should check with you and verify that the 130' MD shift is not a concern from your side.This move is being done to simplify future slickline work. If you feel there is a concern, please let me know and we will stay with the original approved depth. Thanks and apologize for the inconvenience. Kurt Alexa Staff Drilling Engineer ConocoPhillips Alaska 1 (907) 263-4933 ( Office ) 1110 (907) 787-9637 ( Cell ) From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent:Tuesday, May 30,2017 10:30 AM To:Alexa, Kurt J<Kurt.J.Alexa@conocophillips.com> Subject: [EXTERNAL]RE: CRU CD5-17(PTD 217-017 Revised) Packer Setting Depth Waiver Kurt, Approval is granted to set the production packer at"'13,850' MD/7,284'ND. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loem ialaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loepp@alaska.gov From:Alexa, KurtJ [mailto:Kurt.J.Alexa@conocophillips.com] Sent:Tuesday, May 30,2017 8:41 AM To: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov> Cc:Sylte, Hanna<Hanna.Sylte@conocophillips.com> Subject: RE:CRU CD5-17(PTD 217-017 Revised)Packer Setting Depth Waiver Victoria, I wanted to give you an update on the CD5-17L1(PTD 217-018)well,we are currently drilling ahead in our Alpine C lateral at 20,000' MD and are looking at being completed drilling by June 2/3rd and preparing to run our upper completion. Have you had a chance to review the previously supplied cement information? If you have any questions or concerns, please do not hesitate to contact me. Thanks. Kurt Alexa Staff Drilling Engineer ConocoPhillips Alaska (907) 263-4933 ( Office ) (907) 787-9637 ( Cell ) 2 11110 0 From:Alexa, Kurt J Sent:Wednesday, May 24,2017 2:54 PM To: 'Loepp,Victoria T(DOA)'<victoria.loepp@alaska.gov> Subject:CRU CD5-17(PTD 217-017 Revised) Packer Setting Depth Waiver Victoria, We got our sonic data processed for the CD5-17 well and is attached in this email. Schlumberger's and my(attached), the TOC is at 12,200' MD/6,634'ND.The intermediate casing shoe is at 15,831' MD/7,604'ND. Attached are the various versions of the Schlumberger job report,the ConocoPhillips Wellview Cementing Report,and the processed recorded-mode sonic log. As per the approved PTD,ConocoPhillips recommends setting the production packer at"'13,850' MD/7,284'ND to better facilitate wellbore access for isolation via slickline in the future. Please let me know if you have any questions and/or approve of this waiver to 20 MC 25.412(b). Thanks Kurt Alexa Staff Drilling Engineer ConocoPhillips Alaska (907) 263-4933 ( Office ) (907) 787-9637 ( Cell ) 3 SOF Tg Iyy,7A THE STATE Alaska Oil and Gas 7�, fALASI�;A o Conservation Commission 333 West Seventh Avenue ' ' r GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 Off' ALAS� Fax: 907.276.7542 www.aogcc.alaska.gov Chip Alvord Drilling Manager ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Re: Colville River Field, Alpine Oil Pool, CRU CD5-17 ConocoPhillips Alaska, Inc. Permit to Drill Number: 217-017 (revised) Surface Location: 385' FNL,2747' FEL, SEC. 18, T11N, R4E, UM Bottomhole Location: 2368' FNL,2623' FEL, SEC. 34, T11N, R4E, UM Dear Mr. Alvord: Enclosed is the approved application for permit to drill the above referenced service well. Per Statute AS 31.05.030(d)(2)(B)and Regulation 20 AAC 25.071,composite curves for well logs run must be submitted to the AOGCC within 90 days after completion,suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition,the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20,Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05,Title 20,Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, i� CathyOlf7 Foerster Chair DATED this 1L day of May, 2017. RECEIVED STATE OF ALASKA AL OIL AND GAS CONSERVATION COMMON opiAl 06 2017 PERMIT TO DRILL ��C�i 20 AAC 25.005 1a.Type of Work: lb.Proposed Well Class: Exploratory-Gas El Service- WAG 0 Service-Disp ❑ 1c.Specify if well is proposed for: Drill ❑., Lateral ❑ Stratigraphic Test ❑ Development-Oil ❑ Service- Winj D Single Zone ❑ Coalbed Gas El Gas Hydrates ❑ Redrill❑ Reentry❑ Exploratory-Oil ❑ Development-Gas ❑ Service-Supply ❑ Multiple Zone CI Geothermal ❑ Shale Gas ❑ 2.Operator Name: 5. Bond: Blanket a Single Well ❑ 11.Well Name and Number: ConocoPhillips Alaska,Inc. Bond No. 59-52-180 CRU CD5-17 3.Address: 6.Proposed Depth: 12.Field/Pool(s): P.O.Box 100360 Anchorage,AK 99510-0360 MD: 28195* TVD: • 7674 Colville River Unit 4a. Location of Well(Governmental Section): 7.Property Designation(Lease Number): Alpine Pool Surface: 385'FNL,2747' FEL,Sec.18,T11N,R4E,UM ASRC-NPR4,ADL387208,ASRC-NPR2,ADL387209 Top of Productive Horizon: 8.Land Use Permit: 13.Approximate Spud Date: 1997'FNL,3142'FEL,Sec.21,T11N,R4E,UM 932669,932193,932128,932195 4/25/2017 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 2368'FNL,2623'FEL,Sec.34,T11N,R4E,UM 5032.03,1145.67,8838.21,639.93 3090'from ADL388905 4b.Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL(ft): 70.3 15.Distance to Nearest Well Open Surface:x- 349231 y- 5965829 Zone•4 GL Elevation above MSL(ft): 34 to Same Pool: 1400' 16.Deviated wells: Kickoff depth: 500 feet 17.Maximum Potential Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 92.84 degrees t Downhole: 3600 Surface: 2840 18.Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42" 20" 94 H-40 Welded 78 36 36 114 114 10 yds. 13-1/2" 10-3/4" 45.5 L-80 H-563/BTC 2196 36 36 2232 2185 887 sx 11.0 ppg,288sx 15.8 ppg G(Actual) 9.875x10.5"7-5/8" 29.7 L-80 H-563/BTC 15773 36 36 15809 7598 1st::868 sx 15.8 ppg G/2nd:214sx 15.8ppg I 6-3/4" Open Hole n/a n/a n/a 12386 15809 7598 28195 7674 Barefoot completion 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effect.Depth MD(ft): Effect.Depth TVD(ft): Junk(measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program Q Time v.Depth Plot ❑ Shallow Hazard Analysis❑ Diverter Sketch ❑ Seabed Report El Drilling Fluid Program Q 20 AAC 25.050 requirements 21. Verbal Approval: Commission Representative: Date 22.I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Kurt Alexa 263-4933 Email Kurt.J.Alexa@COP.com Printed Name //Chip Alvord Title Drilling Manager Signature /tel_'(.04 Phone 265-6120 Date (c Z t 1 9r �J Commission Use Only Permit to Drill API Number: Permit Approval See cover letter for other Number:2.,t1-017 «.V6€ 50-)03-2.G76'-G0 -0G Date: 3 -2q-20I'.f requirements. Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained in shales: 0 Other: O ) 5 Samples req'd: Yes No r-._,( Mud log req'd:Yes ❑ No ®, fjd(� tis t� 3 s h 5-r LTJ f''t' - vda v pVr v-i!�., rT/5- f O/ ZS�/�I2 measures: Yes No ❑ Directional svy req'd:Yes No ❑ ,C i i/e Kt-yr in fa/ rr rcrvi/lCl Spacing exception req'd: Yes ❑ No ri Inclination-only svy req'd:Yes ❑ No p-c r .t> 44 C „25, 0 35-60(2-) Post initial injection MIT req'd:Yes �No El APPROVED BY Approved by: T_ COMMISSIONER THE COMMISSION Date:-/2 5-1 L 5 q`` Submit Form and Form 10-401,(f vised 11/2015) Ot4tIsNdA1_mOnths from the date of approval(20 AAC 25.005(g)) Attachments in Duplicate • i ConocoPhillips Alaska,Inc. Post Office Box 100360 Anchorage,Alaska 99510-0360 ConocoPhillips Telephone 907-276-1215 May 3,2017 Alaska Oil and Gas Conservation Commission RECEIVED 333 West 7th Avenue, Suite 100 Anchorage,Alaska 99501 MAY p 4 2017 Re: Application for Permit to Extend Drilling of CRU CD5-17 to 28,195' MD AOGCC Dear Sir or Madam: ConocoPhillips Alaska,Inc.hereby applies to extend drilling of the CRU CD5-17 well. Currently there is a Permit to Drill (217-017)in place for the onshore WAG injection well and ConocoPhillips Alaska Inc. is drilling in the intermediate section of this well from the CD5 drilling pad with rig Doyon 19. The spud date for this well was 4/25/17. CRU CD5-17 is planned to be an Alpine A and C dual lateral injection well,with the Alpine C lateral coverd in the CD5-17L1 PTD.The 13-1/2"surface hole will TD above the C-30 sand. The surface hole will then be cased with 10-3/4"casing and cemented to surface.The intermediate section will be drilled with a 9-7/8"x 10-1/2"underreamer BHA and Managed Pressure Drilling technology.This hole will be subsequently cased with a 7-5/8"casing string to surface and cemented to 500' above the uppermost hydrocarbon bearing interval.The suface by intermediate casing annulus will then be evaluated for future annular disposal by performing a leak-off test. The 6-3/4"production section will then be horizontally drilled and completed as an injector in the Alpine A reservoir.The well will be completed as a barefoot completion. A second lateral, CD5-17L1 (Permit#217-018),will then be drilled in the Alpine C Sand,with the upper completion covered in the corresponding PTD application. Please fmd attached the information required by 20 AAC 25.005 (a) and(c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 Application For Permit to Drill per 20 AAC 25.005 (a) 2. A proposed drilling program 3. A proposed completion diagram 4. A drilling fluids program summary 5. Pressure information as required by 20 AAC 25.035 (d)(2) 6. Directional drilling/collision avoidance information as required by 20 AAC 25.050(b) Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 AAC 25.035(a)and(b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information,please contact Kurt Alexa at 263-4933 or Chip Alvord at 265-6120. Sincerely, cc: CD5-17 Well File/Ann Haggerty-Sherrod ATO 1530 Johnson Njoku ATO 1720 Chip Alvord ATO 1570 Kurt Alexa Jason McLennan ATO 1790 Drilling Engineer Lanston Chin Kuukpik Corp • Applicallor Permit to Drill,Well CRU CD5-17 Saved:3-May-17 CD5-17 Application for Permit to Drill Document pp Drilling &wells ConocoPhiII ps Table of Contents 1. Well Name (Requirements of 20 AAC 25.005 (1)) 3 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) 3 Requirements of 20 AAC 25.050(b) 3 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005(c)(3)) 3 4. Drilling Hazards Information (Requirements of 20 AAC 25.005 (c)(4)) 4 5. Procedure for Conducting Formation Integrity Tests (Requirements of 20 AAC 25005 (c)(5)) 5 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) 5 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) 5 8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8)) 6 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005 (c)(9)) 7 10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10)) 7 11. Seabed Condition Analysis (Requirements of20AAC 25.005 (c)(11)) 7 12. Evidence of Bonding (Requirements of 20 AAC 25.005 (c)(12)) 7 13. Proposed Drilling Program (Requirements of 20 AAC 25.005 (c)(13)) 7 14. Discussion of Mud and Cuttings Disposal and Annular Disposal 9 (Requirements of 20 AAC 25.005 (c)(14)) 9 15. Attachments 10 Attachment 1 Cement Summary 10 CD5-17 APD Page 1 of 15 Printed:3-May-17 11 • A lica r Permit to Drill,Well CRU CD5-17 pp Saved:3-May-17 Attachment 2 Drilling Hazards Summary 10 Attachment 3 Completion Schematic 10 Attachment 4 Directional Plan 10 CD5-17 APD Page 2 of 15 Printed:3-May-17 • Applica•or Permit to Drill,Well CRU CD5-17 Saved:3-May-17 1. Well Name (Requirements of 20 AAC 25.005(f)) The well for which this application is submitted will be designated as CRU CD5-17. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) Location at Surface 385'FNL,2747'FEL, Sec. 18,T11N,R4E,UM NAD 1927 RKB Elevation 70.3'AMSL Northings: 5,965,829 Eastings:349,231 Pad Elevation 34'AMSL Top of Productive Horizon(Heel) 1997'FNL,3142'FEL, Sec.21,T11N,R4E,UM NAD 1927 Measured Depth, RKB: 15,809' Northings: 5,958,742 Total Vertical Depth, RKB: 7,598' Eastings: 359,282 Total Vertical Depth, SS: 7,528' Total Depth (Toe) 2368'FNL,2623'FEL, Sec. 34,T11N,R4E,UM NAD 1927 Measured Depth, RKB: 28,195' Northings: 5,947,707 Total Vertical Depth, RKB: 7,674' Eastings: 364,903 Total Vertical Depth, SS: 7,604' Requirements of 20 AAC 25.050(b) Please see Attachment 4: Directional Plan The Applicant is the only affected owner. 3. Blowout Prevention Equipment Information (Requirements of20AAC 25.005(c)(3)) Please reference BOP and diverter schematics on file for Doyon 19. CD5-17 APD Page 3of15 Printed:3-May-17 Applica r Permit to Drill,Well CRU CD5-17 • Saved:3-May-17 4. Drilling Hazards Information (Requirements of 20 AAC 25.005(c)(4)) The following presents data used for calculation of anticipated surface pressure(ASP)during drilling of this well: Casing Size Csg Setting Depth Fracture Pore pressure ASP Drilling (in) MD/TVD(ft) Gradient(ppg) (psi) (psi) 20 114/ 114 10.9 52 54 10.75 2,232/2,185 14.5 989 1,430 7.625 15,809/7,598 12.5 3,600 2,840 N/A 28,195/7,674 12.5 3,600 n/a PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE(ASP) ASP is determined as the lesser of 1)surface pressure at breakdown of the formation casing seat with a gas gradient to the surface,or 2)formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP=[(FG x 0.052)-0.1]*D Where: ASP=Anticipated Surface pressure in psi FG=Fracture gradient at the casing seat in lb/gal 0.052=Conversion from lb./gal to psi/ft 0.1 =Gas gradient in psi/ft D=true Vertical depth of casing seat in ft RKB OR 2) ASP=FPP-(0.1 x D) Where: FPP=Formation Pore Pressure at the next casing point FPP=0.4525 x TVD 1. ASP CALCULATIONS 1. Drilling below 20"conductor ASP=[(FG x 0.052)-0.1] D =[(10.9 x 0.052)-0.1]x 114=53 psi OR ASP=FPP-(0.1 x D) =989-(0.1 x 2185')=771 psi 2. Drilling below 10-3/4"surface casing ASP= [(FG x 0.052)-0.1]D = [(14.5 x 0.052)-0.1]x 2185' = 1430 psi OR ASP=FPP-(0.1 x D) =3600-(0.1 x 7598')=2840 psi 3. Drilling below 7-5/8"intermediate casing ASP=[(FG x 0.052)-0.1]D =[(12.5 x 0.052)-0.1]x 7598=4179 psi OR ASP=FPP-(0.1 x D) =3600-(0.1 x 7598')=2840 psi CD5-17 APD Page 4 of 15 Printed:3-May-17 iApplicallor Permit to Drill,Well CRU CD5-17 Saved:3-May-17 (B)data on potential gas zones; The well bore is not expected to penetrate any gas zones. (C) data concerning potential causes of hole problems such as abnormally geo-pressured strata,lost circulation zones,and zones that have a propensity for differential sticking; Please see Attachment 2-Drilling Hazards Summary 5. Procedure for Conducting Formation Integrity Tests (Requirements of20AAC 25.005(c)(5)) Drill out surface casing shoe and perform LOT test or FIT in accordance with the Alpine LOT/FIT procedure that ConocoPhillips Alaska has on file with the Commission. 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) Casing and Cementin Program Csg/Tbg Hole Weight Length Top MD/TVD Btm MD/TVD OD(in) ��) (lb/ft) Grade Conn. (ft) (ft) (ft) Cement Program 20 42 94 H-40 Welded 80 36/36 116/116 10 yrds HYD Cement to Surface with 10-3/4 13.5 45.5 L-80 563 X 2,196 36/36 2,232/2,185 972 sx DeepCrete Lead 11.0 ppg, BTCM 271 sx Class G Tail Slurry 15.8 ppg 7-5/8 9'875 29.7 L-80 63DX 15,809 36/36 15,809/7,598 Stage 1: 1037 sx Class G at 15.8 ppg x11 BTCM Stage 2: 171 sx Class G at 15.8 ppg n/a 6.75 n/a n/a n/a 11,386 15,809/7,598 28,195/7,674 N/A—Barefoot Completion 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) It is requested that a waiver of the diverter requirement under 20 AAC 25.035(h)(2)is granted. At CD5,fifteen penetrations have been completed and there has not been a significant indication of shallow gas or gas hydrates above the C30 where casing will be set. CD5-17 APD Page 5 of 15 Printed:3-May-17 • Applica.r Permit to Drill,Well CRU CD5-17 Saved:3-May-17 8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8)) Surface Intermediate Production Hole Size in. 13.5 9.875 x 10.5 6.75 Casing Size in. 10.75 7.625 4.5 Density PPG 9.0- 10.0 9.6-11.0 9.0-9.5 PV cP 30-80 10 10 YP Ib./100 ft2 100-200 20- 28 10- 15 Funnel Viscosity s/qt. 300 50-60 40- 50 Initial Gels Ib./100 ft2 50 10 6 10 Minute Gels Ib./100 ft2 60 15 8 API Fluid Loss cc/30 min. N.C. - 15.0 5.0 4.0 HPHT Fluid Loss cc/30 min. n/a 8.0- 12.0 10.0 pH 11.0 9.5- 10.0 9.0-9.5 Surface Hole: (Completed) A mixed-metal oxide fresh water drilling fluid(Drilplex)was used for the surface interval. Kept flow line viscosity at±200 sec/qt while drilling and running casing.Reduced viscosity prior to cementing.Maintained mud weight <l0.0 ppg by use of solids control system and dilutions where necessary. 110bbls of good cement was returned to surface during surface cement job. Intermediate: Fresh water polymer mud system.Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. There is a slight potential for lost circulation,particularly after the reservoir is penetrated. Maintain mud weight at 9.6ppg prior to HRZ and 10.3ppg after HRZ and be prepared to add loss circulation material if losses occur. Good filter cake quality,hole cleaning and maintenance of low drill solids(by diluting as required) will all be important in maintaining wellbore stability.The mud will be weighted up to 10.8-11.0 ppg before pulling out of the hole. Note:Managed Pressure Drilling(MPD)will be utilized for adding backpressure during connections to mitigate shale instability and cycling. Production Hole: The horizontal production interval will be drilled with a water-based mud drill-in fluid(FloPro)weighted to 9.0- 9.5 ppg with calcium carbonate and KC1. Diagram of Doyon 19 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. CD5-17 APD Page 6 of 15 Printed:3-May-17 Applicaar Permit to Drill,Well CRU CD5-17 Saved:3-May-17 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A-Application is not for an exploratory or stratigraphic test well. pp p rY 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A-Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A-Application is not for an offshore well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska,Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of20AAC25.005(c)(13)) The proposed drilling program is listed below. Please refer to Attachment 3: Completion Schematic. 1. MIRU Doyon 19 onto CD5-17. 2. Rig up and test riser,dewater cellar as needed. 3. Drill 13.5"hole to the surface casing point as per the directional plan(LWD Program: GR). 4. Run and cement 10-3/4"surface casing to surface. 5. Install BOPE and MPD equipment. 6. Test BOPE to 250 psi low/3500 psi high(24 hr.AOGCC notice). 7. Pick up and run in hole with 9-7/8"x 10.5"drilling BHA to drill the intermediate hole section. 8. Chart casing pressure test to 3500 psi for 30 minutes. 9. Drill out 20' of new hole and perform LOT.Maximum LOT to 18.0 ppg(obtained). Minimum LOT required to drill ahead is 13.0 ppg EMW. 10. Drill 9-7/8"x 10.5"hole to section TD using Managed Pressure Drilling to maintain constant bottom hole pressure on connections(LWD Program: GR/Res). 11. Change out upper pipe rams to 7-5/8"solid bodies and test same to 3,500 psi. 12. Run 7-5/8"casing and cement to 500' above hydrocarbon bearing zones(cementing schematic attached). 13. Change upper pipe rams to 3-1/2"x 6"VBRs. 14. Test BOPE to 250 psi low/3,500 psi high(24 hr.AOGCC notice). 15. Pick up and run in hole with 6-3/4"drilling BHA.Verify top of cement with sonic tool in recorded mode. 16. Chart casing pressure test to 3500 psi for 30 minutes. 17. Drill out shoe track and 20 feet of new formation.Perform LOT to a maximum of 16.0 ppg.Minimum required leak-off value is 11.0 ppg EMW. 18. Drill 6-3/4"hole to section TD(LWD Program: GR/RES/Sonic for TOC evaluation). 19. Pull out of hole with drilling BHA. 20. Run and set whipstock for kickoff in the Alpine C Sand. 21. Mill window and at least 13-20 feet of new formation. CD5-17 APD Page 7 of 15 Printed:3-May-17 • Applicaleor Permit to Drill,Well CRU CD5-17 Saved:3-May-17 22. POOH and lay down milling BHA. 23. End PTD for CD5-17 and begin PTD for CD5-17L1. CD5-17 APD Page 8of15 Printed:3-May-17 • ApplicaDr Permit to Drill,Well CRU CD5-17 Saved:3-May-17 14. Discussion of Mud and Cuttings Disposal and Annular Disposal (Requirements of 20 AAC 25.005(c)(14)) Incidental fluids developed from drilling operations on well CD5-17 will be injected into a permitted surface casing x production casing annulus on CD5. The CD5-17 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000'TVD. Significant hydrocarbon zones include only the Alpine and Kuparuk sand based on pre-drill interpretations. There will be 500' of cement placed above the top of the Kuparuk reservoir. Once CD5-17 has been drilled and completed,consideration may be given to permit this well for annular injection. An application for Sundry Operations form 10-403 will then be filed. Annular pumping of fluids occurring due to drilling operations,per regulation 20 AAC 25.080 could then begin once properly permitted. As stated above,any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the base of the Schrader Bluff Formation(C-40). These 450-500'thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes.Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection,the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure =(12.0 ppg)*(0.052) *(Surf. Shoe TVD)+ 1,500 psi =(12.0 ppg) *(0.052) *(2,185')+ 1,500 psi =2864 psi Pore Pressure = 1,049 psi Therefore Differential=2864— 1049= 1815 psi. The internal casing pressure is conservative,since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85%collapse and burst ratings listed in the following table: OD Wt Grade Range Connection Collapse 85%of Burst 85%of (PM Type Collapse Burst 10-3/4" 45.5 L-80 3 HYD563/BTCM 2470 psi 2100 psi 5210 psi 4429 psi 7-5/8" 29.7 L-80 3 HYD563/BTCM 4790 psi 4071 psi 6890 psi 5856 psi CD5-17 APD Page 9 of 15 Printed:3-May-17 • ApplicalPor Permit to Drill,Well CRU CD5-17 Saved:3-May-17 15. Attachments Attachment 1 Cement Summary Attachment 2 Drilling Hazards Summary Attachment 3 Completion Schematic Attachment 4 Directional Plan CD5-17 APD Page 10 of 15 Printed:3-May-17 • Applicatikr Permit to Drill,Well CRU CD5-17 Saved:3-May-17 Attachment 1 —Cement Summary CD5-17 Cementing Program: CD5-17 wp07 Schematic 20" H Welded Conductor94# -40 to 114' 10-3/4"45.5#L-80 HYD563/BTCM 2,232' MD/2,185'TVD @ 25°inc. Top of Cement 2"d Stage 5,265' MD/3818'TVD K2-Qannik 5,765'MD/4,022'TVD Stage Collar set at 5800' MD/ 3967'TVD 9-7/8"x 11" Hole Top of Cement 1st Stage 13,300' MD/7,080'TVD Kuparuk C 13,882' MD/7,298'TVD 7-5/8"29.7 L-80 HYD563 X BTCM Casing 15,809' MD/7,598'TVD @ 86° \\\ Alpine C NN 14,791' MD/7,487'TVD �NN NNNN Alpine A 15,809' MD/7,598'TVD `N, 6-3/4" Hole 28,195' MD/7,674 @ 90° CD5-17 APD Page 11 of 15 Printed:3-May-17 • Applica.r Permit to Drill,Well CRU CD5-17 Saved:3-May-17 10.75"Surface Casing run to 2,232' MD/2,185' TVD Cement from 2232' MD to 1732'(500' of tail)with Class G+Adds. @ 15.8 PPG,and from 1732'to surface with 11.0 ppg DeepCrete. Assume 250%excess annular volume in permafrost and 50%excess below the permafrost (1323' MD),zero excess in 20"conductor. Lead slurry from 1,744' MD to surface with Arctic Lite Crete @ 11.0 ppg Conductor (114'-36') X 1.3645 ft3/ft X 1.0 (0%excess) = 106 ft3 Permafrost to Conductor (1,323'- 114') X 0.3637 ft3/ft X 3.5 (250%excess) = 1,538ft3 Top of Tail to Permafrost (1,732'- 1,323')X 0.3637 ft3/ft X 1.5 (50%excess) = 223 ft3 Total Volume = 106+ 1,538 + 223 = 1,867 ft3=> 967 sx of 11.0 ppg DeepCrete @ 1.93 ft3/sk Tail slurry from 2,244'MD to 1,744' MD with 15.8 ppg Class G +additives Shoe to Top of Tail (2,232'-1,732')X 0.3637 ft3/ft X 1.50 (50%excess) = 273 ft3 Shoe Joint (80')X 0.5400 ft3/ft X 1.0 (0%excess) = 43 ft3 Total Volume = 273 + 43 = 316 ft3 => 271 sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8%S002 accelerator @ 1.17 ft3/sk Actual Pumped during Surface Job: 887sx of 11.0ppg DeepCrete and 288sx of 15.8ppg Class G (110bbis returned to surface) 7.625" Intermediate Casing run to 15,809' MD/7,598' TVD Top of slurry is designed to be at 13,300' MD,which is 500' above the Kuparuk C.Assume 40%excess annular volume. *10.5"Under reamer is 120' above the 9-7/8"bit. 1St Stage: 15,809'MD to 13,300'MD with 15.8 ppg Class G + additives Shoe to top of 9-7/8"Hole (15,809'- 15,689')X 0.2148 ft3/ft X 1.40 (40%excess) = 36 ft3 10.5"Hole to Top of Cement (15,689'- 13,300')X 0.2842 ft3/ft X 1.40(40%excess) = 950ft3 Shoe Joint (80')X 0.2578 ft3/ft X 1.0(0%excess) = 21 ft3 Total Volume = 36+ 950 + 21 = 1007 ft3 => 868 sx of 15.8 ppg Class G + 0.2% D046 antifoamer,0.3% D065 dispersant and 0.8%S002 accelerator @ 1.16 ft3/sk 2nd Stage: 5800' MD to 5265' MD with 15.8ppg Class G +Additives 500'Above Qannik Top from (5800-5265)x 0.2842 ft3/ft x 1.40 (40%excess) = 215 ft3 Stage Collar Total Volume for 2nd Stage: 214ft3 => 185sx of 15.8ppg Class G + + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% S002 accelerator @ 1.16ft3/sk CD5-17 APD Page 12 of 15 Printed:3-May-17 • Applicator Permit to Drill,Well CRU CD5-17 Saved:3-May-17 Attachment 2— Drilling Hazards Summary (To be posted in Rig Floor Doghouse Prior to Spud) 13-1/2" Hole/10-3/4"Casing Interval Event Risk Level Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low Gyro single shots,traveling cylinder diagrams Monitor well at base of permafrost,increased mud weight,decreased Gas Hydrates Low mud viscosity,increased circulating times,controlled drilling rates, low mud temperatures Running Sands and Gravel Low Maintain planned mud parameters,Increase mud weight,use weighted sweeps. Lost Circulation Low Reduced pump rates,mud rheology,lost circulation material,use of low density cement slurries 9-7/8"x 11"Hole/7-5/8"Casing Interval Event Risk Level Mitigation Strategy Reduced pump rates,reduced trip speeds,real time equivalent Lost circulation Low circulating density(ECD)monitoring,mud rheology,lost circulation material Hole swabbing on trips Low Annular pressure applied by managed pressure drilling equipment. Abnormal Reservoir Pressure Low Well control drills,increased mud weight.No mapped faults occur across the path of the planned wellbore. Hydrogen Sulfide gas Low H2S drills,detection systems, alarms,standard well control practices, mud scavengers 6-3/4"Open Hole Production Interval Event Risk Level Mitigation Strategy Reduced pump rates,reduced trip speeds,real time equivalent Lost circulation Low circulating density(ECD)monitoring,mud rheology,lost circulation material Hole swabbing on trips Low Annular pressure applied by managed pressure drilling equipment. Abnormal Reservoir Pressure Low Well control drills,increased mud weight. Hydrogen Sulfide gas Low H2S drills,detection systems,alarms,standard well control practices, mud scavengers CD5-17 APD Page 13 of 15 Printed:3-May-17 • Applicator Permit to Drill,Well CRU CD5-17 Saved:3-May-17 Well Proximity Risks: Directional drilling/collision avoidance information as required by 20 ACC 25.050(b)is provided in the following attachments. Drilling Area Risks: Reservoir Pressure: Offset production has the potential to reduce the reservoir pressure. LCM material will be on location to deal with losses. Weak sand stringers could be present in the overburden. LCM material will be available to seal in losses in the intermediate section. Lower Shale Stability:HRZ/Kalubik/Miluveach and instability in the intermediate interval will require higher mud weights and managed pressure drilling in order to stabilize the formations. Standard LCM material and well bore strengthening pills are expected to be effective in dealing with lost circulation if needed. CD5-17 APD Page 14 of 15 Printed:3-May-17 • Applicator Permit to Drill,Well CRU CD5-17 Saved: 3-May-17 Attachment 3— Completion Schematic (includes Alpine C lateral, as detailed in CD5-17L1 PTD) CD5 - 17 Alpine A/C Dual Lateral Injector Proposed Schematic 20"94#H 40 Welded Upper Completion: t i:`: 1)4-'/z"12.6#/ft TXP Conductor to 116'MD 2)Shallow nipple profile 3)4-'/z°x 1"Camco KBMG GLM(xx°)w/DCK2 pinned for 2500 psi casing to tbg shear ii 4)Baker Premier Packer =- iii 5)CMU sliding sleeve — 6)DB nipple 3.75"ID Lower Completion: " `'` 7) Open Hole Completion in NC sand A."" "" 10-314"45#L-80 H563 ILSurface Casing at 2,244'MD -no junction 8)ZXP liner top packer&Flexlock Liner Hanger XO 5"Hydril 521 Box X 4-'/2"IBTM pin 100'4.5" 12.6#L-80 Tail(-100') 4-1/2" 12.6#L-80 TXP 7 5/8"29#L-80 Hyd 563/BTCM Intermediate Casing at 15,809'MD 1 i� C sand Lateral 6 3/4"Hole TD I 14,926'-27,219'MD Production Packer /4,4p A sand Lateral at 13,900'MD \ 6 3/4"Hole TD "-,*iii::... :� 15,809'-28,195'MD I CMU Sliding sleeve L"' j imu for Selectivity -����1: iti: =�_..,W_ii; ZXP liner top packer(whipstock base)at 15,100'MD CD5-17 APD Page 15 of 15 Printed:3-May-17 • S cD5-1 7wCD5-1 7wfaii Permit Pack Plan Summary \� :� , oma' o >..3 , _3 �0 �7 _ . olla1 s (• C:::::.O m _ \ Alpin C _ _ 1111r111.1°.°10; To, Base Permafli4X-2 Bklbian 97Albian 96 FCS 714 TOW 0 O I I I I I I I I ‘ i I I I I-D 0 6500\ 13000 19500 26000MIN S .�i �e•" - � 120"x"42"1 110-314"x 13-1/21 Measured Depth I7-5/8"X 9-7/8"by 10-1/21 - r ` �0`_ 20"x42" •• 0i11 !' CD I I I I I I I I I I I I ,pp 36 500 0 3000 6000 9000 12000 15000 18000 21000 240t 0 Horizontal Departure 121. 690 - 670 330 i 690 - 870 .... .-..,6.0.01,.. 4 0 870 - 1060 .1141_' MB 1060 - 1240 g 60 . : ^i.� 1240 - 1430 `` 300i.�4 1'‘o, 60 1430 - 1610 0. -. 1744,3,7,41' .1 �i...:;;„---.•:. 1610 1610 - 1800 co - .' P� CO �A�� 4 1800 -2860 2 -- -- - .-4,-trig. ' s53 2860 3930 d 30 - rrc '- 3930 -4990 U ii''�F2* :' �' ea< 4990 - 6050 270 " „• :_O. ,: 6050 - 7110 . e - 7110 -8170 ii 0 Rig:CDS-7 _. E 1 Lg --, 98170 240 - 9240 I .. ..w21 �.�s��� i 9�`a' - 10301 I I I I I I I III I I I i I I I I I `.- a l'ir-Q! !.V.''. 10300 - 12411 0 4000 8000 12000 16000 20000 24000 28000 240 �\`\ ��.qwo 120 12410 - 14521 SURVEY PROGRAM w� �, '4�� 4., r 14520 - 166,1 Surface Location :4.V.;- 16640- 1e751 depth From Depth To Survey/Plan Tool North/Y: -0✓ ;���! East/X: 18750 - 20861 36.30 400.00 CD5-17wp11(Toe Up)(Rig:CD5-17) INC 210 ' 36.30 1000.00 CD5-17 11(Toe Up)(Rig:CD5-17) GYD-GC-SS Pad Elevation:34.00 :"-34x:71.820860 22971 1000.00 2000.00 CD5-17wp11(Toe Up)(Rig:CD5-17) MWD l0 22970 "`"" 25081 1000.00 2224.15 CD5-17wp11(Toe Up)(Rig:CD5-17)MWD+IFR-AK-CAZ-SC CASING DETAILS 25080 - 2719- 2224.15 3724.15 CD5-17wp11(Toe Up)(Rig:CD5-17) MWD TVD MD Name M 2224.15 15809.06 C05-17wp11(Toe Up)(Rig:CD5-17)NIWD+IFR-AK-CAZ-SC 115.30 115.30 20"x 42" Magnetic Model: BGGM2016 T 15809.06 17309.06 CD5-17wp11(Toe Up)(Rig:CD5-17) MWD 2185.30 2224.15 10-3/4"x 13-1/2" Magnetic Model Date: 22-Apr-17 15809.06 28195.19 CD5-17wp11(Toe Up)(Rig:CD5-17)MWD+IFR-AK-CAZ-SC 7598.30 15809.09-5/8"X 9-7/8"by 10-1/2" Magnetic Declination: 17.20° 7673.75 28195.19 4-1/2"x 6-3/4" To convert a Magnetic Direction to a True Direction,Add 17.20°East SECTION DETAILS =1320.3 Sec MD Inc Azi TVD +N/-S +E/-W Dleg TFace VSect Target Annotation 1 36.30 0.00 0.00 36.30 0.00 0.00 0.00 0.00 0.00 Base Permafrost 2 500.00 0.00 0.00 500.00 0.00 0.00 0.00 0.00 0.00 Start Build 1.50 3 600.01 1.50 10.00 600.00 1.29 0.23 1.50 10.00 -1.03 Start Build 2.00 -2321.1 4 750.23 4.50 10.00 750.00 9.04 1.59 2.00 0.00 -7.23 Start DLS 2.00 TFO 140.00 5 1272.17 7.56 127.69 1270.30 8.23 32.40 2.00 140.00 7.94 Start 100.88 hold at 1272.17 MD C-30 6 1373.04 7.56 127.69 1370.30 0.12 42.90 0.00 0.00 20.03 Start DLS 2.00 TFO-7.82 -2854.3 7 2224.15 24.53 122.19 2185.30 -129.17 238.15 2.00 -7.82 225.86 Start 20.00 hold at 2224.15 MD 8 2244.15 24.53 122.19 2203.49 -133.59 245.18 0.00 0.00 233.06 Start DLS 3.00 TFO-3.74 9 3630.07 66.07 119.47 3157.19 -620.01 1076.93 3.00 -3.74 1053.02 Start 9837.17 hold at 3630.07 MD C-10 10 13467.24 66.07 119.47 7147.14 -5043.77 8905.12 0.00 0.00 8634.09 Start DLS 3.00 TFO 67.23 11 14700.82 83.63 153.42 7477.30 -5899.29 9697.98 3.00 67.23 9761.69 Start 225.33 hold at 14700.82 MD 12 14926.15 83.63 153.42 7502.30 -6099.56 9798.18 0.00 0.00 9985.56 CD5-17 00.L1TOW 011117 DK Start 788.02 hold at 14926.47 MD -38981 13 14926.47 83.63 153.42 7502.34 -6099.85 9798.33 1.00 -74.88 9985.88 Start 788.02 hold at 14926.47 MD =VW 14 15714.49 83.63 153.42 7589.75 -6800.21 10148.79 0.00 0.0010768.80 Start DLS 3.00 TFO-33.46 15 15809.06 86.00 151.85 7598.30 -6883.85 10192.08 3.00 -33.4610862.97 CD5-17 01.Heel 011117 DK Start 20.00 hold at 15809.06 MD K-2 Base 16 15829.06 86.00 151.85 7599.70 -6901.44 10201.49 0.00 0.0010882.92 Start DLS 3.00 TFO 0.00 17 15943.89 89.44 151.85 7604.26 -7002.59 10255.62 3.00 0.0010997.64 Start 11251.30 hold at 15943.89 MD -4819.5 18 27195.19 89.44 151.85 7713.30-16922.50 15563.64 0.00 0.0022248.37 CD5-17 02.Toe 011117 DK Start Build 1.00 19 27535.19 92.84 151.85 7706.51 -17222.18 15724.00 1.00 0.00 22588.25 Start 660.00 hold at 27535.19 MD 20 28195.19 92.84 151.85 7673.75-17803.39 16035.00 0.00 0.00 23247.43 TD at 28195.19 Albian 97 CD4-321 minor risked at-5691.7 .'„, .. , , 1 in 50. Alban 96 Minor Risked Rig: CD5-17 dilled " II -71 ,7°P ..' interval of this well plan.=73K-1 C 33 1Ili1 TOW •tit,egning cels I acknowledge mall nave peen manse of an nses,cmecredmal me data is ronea,ersurea a''s comp mess.ana an surrwming wars areasvgnee to meproper position an.l approve the scan aru Galleon avoidance 90 as set out In Ole audit pack l approve it as the ease for the firel well plan and wellsle drawings.I also acknowledge that,unless note.dderwlse,all targets have a 1001ee1 lateral tolerance. Prepared by: Checked by: Accepted by: Approved by: B.Temple H.Anh E.Stark K.Alcoa • • Spider View • • 11:18 May s Easting(4500 usft/in) . - 'odi ' -44 CD2-5• �� ` /��� CD• �/ . sem...._—lir _� � 4ii D2-0 Nui. ut 1 ��� iik 1?2-29 /i,/ //II \ 6 CD2-44 / .—�' • D2-4... 1 ��• DIII ��-�oP61 1. •� D2-51 _ / a 3 CD4-07 I \ 'IP D2-45 V/ 11%.,---14 ��- - CD s 2-52 CD5 Alpine West Pad ���-' ..2-33A ' �� 'C86 l , ., v 1.12-44 CD2•C(D s: (Sa. — 15-21 \‘, ::2 :t D2\: t2-27 LZ - CD2- Z i,... CD 8L1 3 cCD5-0 CD2- CD2-4 0 a- CD5-05 CD '&7,V.; D2-' -53 rn- \I'\-\, ,, D5-:f.9 1a a4 ix'•61 0– D5-OS CD4-2: ` ,6 yif. ineCD55 \D4.04•:c _ 2�• ���- e Z A CD4 Nanuq Pad: . `• coagimm - CD5-315PB1 CD5-313PB �1-r,t�,,_34., 1'�®&-.�� \� CD4 2' :. /14-3 ,/�+ 1 #i 76/4 - CD5-313 CD5 8L1 _ •• v\B2 ` CD5-99A \CD + :gA��1 otP...,•711 D4 y: z oe-214 CD5-18-�- CD5-17wp11 �•B1 CD4-27'B3 - CD5-315 _ CD4-208A I i . t t t i t t t , i i i , , i . . . i i i i i i i , i i • p r-, t i t t t t i i i i , i T. . , i i i i i i t t , H , , , , i i i i i i i i t :,;-....-. . .:78-03 Easting(4500 usft/in) Plan View • • CD5-17wp 11 Plan View 19500— Oz' G 6 14 oie 13000- 2 --------- t,o-- O -- - G 6500— , N I 0 1f9r4e*?7 Lir* AL cfl ; y ' ct.,,41'. fr,$' 20"x 42" .._;�:,«•.r e iL, 0-6500— N.-f.-�Lr�y1.I i 10 3/4"x 13-1/2 ,..miii, 0-,464d. ��i ,� -13000— 7-5/8"X 9-7/8" 10-1/2" �►y2`Op 0 8�� __ ?..„,,,,_,,,,0 .1 �p--- - 05 P D5 313 . ®0 6 4-1/2"x 6-3/4" , -------- G05,� 19500— 315 • ..c\ GD5 O ..�44PI I -19500 -13000 -6500 0 6500 13000 19500 26000 32500 39000 West(-)/East(+) (6500 usft/in) i • Section View • i CD5-17wp11 Section View -3000– 1 20"x 42" _------ 0- -"E 0. _____ Base Permafrost -_" S -- --000 _C-30 ��-� _ -_-C-10___--____10-3/4" x 13-1/2" nxo L 3000 _ -' K-3) 000 0 __ K 2 ^oo oo° 0 7-5/8"X 9-7/8"by 10-1/2" 4-1/2"x 6-3/4" 0 0 o -- --- -K-2 Base 4,oeo 000 00 • • 45 6000------ —Albian 97— +•..- �0 0 0 0 0 0 0 0 0 ° 0 0 0 0 c, ,o a) Albian 96 �ao + N N CON N N N N I ,,—,—,-- I-- 1--- rr-r -r- 7- = = = V - FCS Top-- a Kalubik mo 9000– LCU CM i'uparuk C ,Alpine C UJU CD5-17 00.L1TOW 011117 DKCD5-17 01.Heel 011117 ON CD5-17 02.Toe 011117 DK 12000– Alpine A 1 I I I I I I 1 1 0 3000 6000 9000 12000 15000 18000 21000 24000 Vertical Section at 152.00°(3000 usft/in) ! i Plan Report i i ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: CD5-17 Rig: CD5-17 Plan: CD5-17wp11 Report 03 May, 2017 0 • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 Project Western North Slope,North Slope Alaska,United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site CD5 Alpine West Pad Site Position: Northing: Latitude: From: Map Easting: Longitude: Position Uncertainty: 0.00 usft Slot Radius: 13-3/16" Grid Convergence: -1.15° Weil Rig:CD5-17 Well Position +N/-S 0.00 usft Northing: Latitude: +E/-W 0.00 usft Easting: Longitude: Position Uncertainty 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 34.00 usft Wellbore Rig:CD5-17 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2016 4/22/2017 17.20 80.81 57,504 Design, CD5-17wp11 Audit Notes: Version: Phase: PLAN Tie On Depth: 36.30 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 36.30 0.00 0.00 152.00 Survey Tool Program Date 5/3/2017 From To (usft) (usft) Survey(Wellbore) Tool Name Description 36.30 400.00 CD5-17wp11 (Rig:CD5-17) INC Inclinometer(Totco/Teledrift) 36.30 1,000.00 CD5-17wp11 (Rig:CD5-17) GYD-GC-SS Gyrodata gyro single shots 1,000.00 2,000.00 CD5-17wp11 (Rig:CD5-17) MWD MWD-Standard 1,000.00 2,224.15 CD5-17wp11 (Rig:CD5-17) MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 2,224.15 3,724.15 CD5-17wp11 (Rig:CD5-17) MWD MWD-Standard 2,224.15 15,809.06 CD5-17wp11 (Rig:CD5-17) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 15,809.06 17,309.06 CD5-17wp11 (Rig:CD5-17) MWD MWD-Standard 15,809.06 28,195.19 CD5-17wp11 (Rig:CD5-17) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Planned Survey MD Inc Azi(azimuth) ND TVDSS DLeg TFace Lat Error (usft) (°) (°) (usft) (usft) (°/10Ousft) (°) (usft) 100.00 0.00 0.00 100.00 29.70 0.00 0.00 0.42 115.30 0.00 0.00 115.30 45.00 0.00 0.00 1.61 20"x 42" 200.00 0.00 0.00 200.00 129.70 0.00 0.00 1.61 300.00 0.00 0.00 300.00 229.70 0.00 0.00 2.65 400.00 0.00 0.00 400.00 329.70 0.00 0.00 3.67 5/3/2017 3:55:00PM Page 2 COMPASS 5000.1 Build 74 • 410 Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLeg TFace Lat.Error (usft) (°) (°) (usft) (usft) (°/100usft) (°) (usft) 500.00 0.00 0.00 500.00 429.70 0.00 0.00 0.63 600.01 1.50 10.00 600.00 529.70 1.50 10.00 0.77 700.00 3.50 10.00 699.89 629.59 2.00 0.00 0.91 750.23 4.50 10.00 750.00 679.70 2.00 0.00 0.99 800.00 3.80 19.71 799.63 729.33 2.00 140.00 1.06 900.00 2.93 51.08 899.47 829.17 2.00 130.32 1.20 1,000.00 3.28 88.15 999.33 929.03 2.00 98.99 1.30 1,100.00 4.57 110.88 1,099.10 1,028.80 2.00 61.98 1.36 1,200.00 6.25 122.60 1,198.66 1,128.36 2.00 39.29 1.38 1,272.17 7.56 127.69 1,270.30 1,200.00 2.00 27.63 1.41 1,300.00 7.56 127.69 1,297.89 1,227.59 0.00 0.00 1.43 1,373.04 7.56 127.69 1,370.30 1,300.00 0.00 0.00 1.49 1,400.00 8.09 127.17 1,397.00 1,326.70 2.00 -7.82 1.52 1,500.00 10.08 125.72 1,495.74 1,425.44 2.00 -7.30 1.65 1,600.00 12.07 124.74 1,593.88 1,523.58 2.00 -5.87 1.84 1,700.00 14.06 124.04 1,691.28 1,620.98 2.00 -4.91 2.10 1,800.00 16.06 123.50 1,787.84 1,717.54 2.00 -4.22 2.42 1,900.00 18.06 123.09 1,883.44 1,813.14 2.00 -3.71 2.81 2,000.00 20.05 122.75 1,977.96 1,907.66 2.00 -3.31 3.27 2,100.00 22.05 122.47 2,071.28 2,000.98 2.00 -2.99 2.24 2,200.00 24.05 122.24 2,163.29 2,092.99 2.00 -2.73 2.45 2,224.15 24.53 122.19 2,185.30 2,115.00 2.00 -2.52 2.51 10314"x 13-1/2" 2,244.15 24.53 122.19 2,203.49 2,133.19 0.00 177.51 2.55 2,300.00 26.20 121.94 2,253.96 2,183.66 3.00 -3.74 2.68 2,400.00 29.20 121.56 2,342.49 2,272.19 3.00 -3.52 3.07 2,500.00 32.19 121.25 2,428.47 2,358.17 3.00 -3.18 3.65 2,600.00 35.19 120.99 2,511.66 2,441.36 3.00 -2.92 4.38 2,700.00 38.19 120.76 2,591.84 2,521.54 3.00 -2.70 5.25 2,800.00 41.18 120.56 2,668.79 2,598.49 3.00 -2.51 6.23 2,900.00 44.18 120.38 2,742.29 2,671.99 3.00 -2.36 7.32 3,000.00 47.18 120.22 2,812.15 2,741.85 3.00 -2.23 8.50 3,100.00 50.18 120.08 2,878.17 2,807.87 3.00 -2.12 9.75 3,200.00 53.18 119.94 2,940.17 2,869.87 3.00 -2.02 11.08 3,300.00 56.17 119.82 2,997.99 2,927.69 3.00 -1.94 12.46 3,400.00 59.17 119.71 3,051.46 2,981.16 3.00 -1.87 13.90 3,500.00 62.17 119.60 3,100.43 3,030.13 3.00 -1.81 15.38 3,600.00 65.17 119.50 3,144.78 3,074.48 3.00 -1.76 16.90 3,630.07 66.07 119.47 3,157.19 3,086.89 3.00 -1.71 17.37 3,700.00 66.07 119.47 3,185.56 3,115.26 0.00 0.00 18.45 3,800.00 66.07 119.47 3,226.12 3,155.82 0.00 0.00 8.48 3,900.00 66.07 119.47 3,266.68 3,196.38 0.00 0.00 9.04 4,000.00 66.07 119.47 3,307.24 3,236.94 0.00 0.00 9.60 4,100.00 66.07 119.47 3,347.80 3,277.50 0.00 0.00 10.17 4,200.00 66.07 119.47 3,388.36 3,318.06 0.00 0.00 10.74 5/3/2017 3:55:00PM Page 3 COMPASS 5000.1 Build 74 • • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLeg TFace Lat.Error (usft) (°) (°) (usft) (usft) (°/100usft) (°) (usft) 4,300.00 66.07 119.47 3,428.92 3,358.62 0.00 0.00 11.31 4,400.00 66.07 119.47 3,469.48 3,399.18 0.00 0.00 11.88 4,500.00 66.07 119.47 3,510.04 3,439.74 0.00 0.00 12.46 4,600.00 66.07 119.47 3,550.60 3,480.30 0.00 0.00 13.04 4,700.00 66.07 119.47 3,591.16 3,520.86 0.00 0.00 13.62 4,800.00 66.07 119.47 3,631.72 3,561.42 0.00 0.00 14.20 4,900.00 66.07 119.47 3,672.28 3,601.98 0.00 0.00 14.78 5,000.00 66.07 119.47 3,712.84 3,642.54 0.00 0.00 15.36 5,100.00 66.07 119.47 3,753.40 3,683.10 0.00 0.00 15.94 5,200.00 66.07 119.47 3,793.96 3,723.66 0.00 0.00 16.53 5,300.00 66.07 119.47 3,834.52 3,764.22 0.00 0.00 17.11 5,400.00 66.07 119.47 3,875.08 3,804.78 0.00 0.00 17.69 5,500.00 66.07 119.47 3,915.64 3,845.34 0.00 0.00 18.28 5,600.00 66.07 119.47 3,956.20 3,885.90 0.00 0.00 18.87 5,700.00 66.07 119.47 3,996.76 3,926.46 0.00 0.00 19.45 5,800.00 66.07 119.47 4,037.32 3,967.02 0.00 0.00 20.04 5,900.00 66.07 119.47 4,077.88 4,007.58 0.00 0.00 20.63 6,000.00 66.07 119.47 4,118.44 4,048.14 0.00 0.00 21.21 6,100.00 66.07 119.47 4,159.00 4,088.70 0.00 0.00 21.80 6,200.00 66.07 119.47 4,199.56 4,129.26 0.00 0.00 22.39 6,300.00 66.07 119.47 4,240.11 4,169.81 0.00 0.00 22.98 6,400.00 66.07 119.47 4,280.67 4,210.37 0.00 0.00 23.57 6,500.00 66.07 119.47 4,321.23 4,250.93 0.00 0.00 24.16 6,600.00 66.07 119.47 4,361.79 4,291.49 0.00 0.00 24.74 6,700.00 66.07 119.47 4,402.35 4,332.05 0.00 0.00 25.33 6,800.00 66.07 119.47 4,442.91 4,372.61 0.00 0.00 25.92 6,900.00 66.07 119.47 4,483.47 4,413.17 0.00 0.00 26.51 7,000.00 66.07 119.47 4,524.03 4,453.73 0.00 0.00 27.10 7,100.00 66.07 119.47 4,564.59 4,494.29 0.00 0.00 27.69 7,200.00 66.07 119.47 4,605.15 4,534.85 0.00 0.00 28.28 7,300.00 66.07 119.47 4,645.71 4,575.41 0.00 0.00 28.87 7,400.00 66.07 119.47 4,686.27 4,615.97 0.00 0.00 29.46 7,500.00 66.07 119.47 4,726.83 4,656.53 0.00 0.00 30.05 7,600.00 66.07 119.47 4,767.39 4,697.09 0.00 0.00 30.64 7,700.00 66.07 119.47 4,807.95 4,737.65 0.00 0.00 31.23 7,800.00 66.07 119.47 4,848.51 4,778.21 0.00 0.00 31.83 7,900.00 66.07 119.47 4,889.07 4,818.77 0.00 0.00 32.42 8,000.00 66.07 119.47 4,929.63 4,859.33 0.00 0.00 33.01 8,100.00 66.07 119.47 4,970.19 4,899.89 0.00 0.00 33.60 8,200.00 66.07 119.47 5,010.75 4,940.45 0.00 0.00 34.19 8,300.00 66.07 119.47 5,051.31 4,981.01 0.00 0.00 34.78 8,400.00 66.07 119.47 5,091.87 5,021.57 0.00• 0.00 35.37 8,500.00 66.07 119.47 5,132.43 5,062.13 0.00 0.00 35.96 8,600.00 66.07 119.47 5,172.99 5,102.69 0.00 0.00 36.55 5/3/2017 3:55.00PM Page 4 COMPASS 5000.1 Build 74 • • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLeg TFace Lat.Error (usft) (0) (°) (usft) (usft) (°/100usft) (°) (usft) 8,700.00 66.07 119.47 5,213.55 5,143.25 0.00 0.00 37.15 8,800.00 66.07 119.47 5,254.11 5,183.81 0.00 0.00 37.74 8,900.00 66.07 119.47 5,294.67 5,224.37 0.00 0.00 38.33 9,000.00 66.07 119.47 5,335.23 5,264.93 0.00 0.00 38.92 9,100.00 66.07 119.47 5,375.79 5,305.49 0.00 0.00 39.51 9,200.00 66.07 119.47 5,416.35 5,346.05 0.00 0.00 40.10 9,300.00 66.07 119.47 5,456.91 5,386.61 0.00 0.00 40.70 9,400.00 66.07 119.47 5,497.47 5,427.17 0.00 0.00 41.29 9,500.00 66.07 119.47 5,538.03 5,467.73 0.00 0.00 41.88 9,600.00 66.07 119.47 5,578.59 5,508.29 0.00 0.00 42.47 9,700.00 66.07 119.47 5,619.15 5,548.85 0.00 0.00 43.06 9,800.00 66.07 119.47 5,659.71 5,589.41 0.00 0.00 43.66 9,900.00 66.07 119.47 5,700.27 5,629.97 0.00 0.00 44.25 10,000.00 66.07 119.47 5,740.83 5,670.53 0.00 0.00 44.84 10,100.00 66.07 119.47 5,781.39 5,711.09 0.00 0.00 45.43 10,200.00 66.07 119.47 5,821.95 5,751.65 0.00 0.00 46.02 10,300.00 66.07 119.47 5,862.51 5,792.21 0.00 0.00 46.62 10,400.00 66.07 119.47 5,903.07 5,832.77 0.00 0.00 47.21 10,500.00 66.07 119.47 5,943.63 5,873.33 0.00 0.00 47.80 10,600.00 66.07 119.47 5,984.19 5,913.89 0.00 0.00 48.39 10,700.00 66.07 119.47 6,024.75 5,954.45 0.00 0.00 48.99 10,800.00 66.07 119.47 6,065.31 5,995.01 0.00 0.00 49.58 10,900.00 66.07 119.47 6,105.87 6,035.57 0.00 0.00 50.17 11,000.00 66.07 119.47 6,146.43 6,076.13 0.00 0.00 50.76 11,100.00 66.07 119.47 6,186.99 6,116.69 0.00 0.00 51.36 11,200.00 66.07 119.47 6,227.55 6,157.25 0.00 0.00 51.95 11,300.00 66.07 119.47 6,268.11 6,197.81 0.00 0.00 52.54 11,400.00 66.07 119.47 6,308.67 6,238.37 0.00 0.00 53.13 11,500.00 66.07 119.47 6,349.23 6,278.93 0.00 0.00 53.72 11,600.00 66.07 119.47 6,389.79 6,319.49 0.00 0.00 54.32 11,700.00 66.07 119.47 6,430.35 6,360.05 0.00 0.00 54.91 11,800.00 66.07 119.47 6,470.91 6,400.61 0.00 0.00 55.50 11,900.00 66.07 119.47 6,511.47 6,441.17 0.00 0.00 56.09 12,000.00 66.07 119.47 6,552.03 6,481.73 0.00 0.00 56.69 12,100.00 66.07 119.47 6,592.59 6,522.29 0.00 0.00 57.28 12,200.00 66.07 119.47 6,633.15 6,562.85 0.00 0.00 57.87 12,300.00 66.07 119.47 6,673.71 6,603.41 0.00 0.00 58.47 12,400.00 66.07 119.47 6,714.27 6,643.97 0.00 0.00 59.06 12,500.00 66.07 119.47 6,754.83 6,684.53 0.00 0.00 59.65 12,600.00 66.07 119.47 6,795.39 6,725.09 0.00 0.00 60.24 12,700.00 66.07 119.47 6,835.95 6,765.65 0.00 0.00 60.84 12,800.00 66.07 119.47 6,876.51 6,806.21 0.00 0.00 61.43 12,900.00 66.07 119.47 6,917.07 6,846.77 0.00 0.00 62.02 13,000.00 66.07 119.47 6,957.63 6,887.33 0.00 0.00 62.61 5/3/2017 3:55:00PM Page 5 COMPASS 5000.1 Build 74 Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLegTFace Lat.Error (usft) (0) (0) (usft) (usft) (°/100usft) (0) (usft) 13,100.00 66.07 119.47 6,998.19 6,927.89 0.00 0.00 63.21 13,200.00 66.07 119.47 7,038.75 6,968.45 0.00 0.00 63.80 13,300.00 66.07 119.47 7,079.31 7,009.01 0.00 0.00 64.39 li 13,400.00 66.07 119.47 7,119.87 7,049.57 0.00 0.00 64.99 13,467.24 66.07 119.47 7,147.14 7,076.84 0.00 0.00 65.38 13,500.00 66.45 120.46 7,160.33 7,090.03 3.00 67.23 65.57 13,600.00 67.66 123.44 7,199.31 7,129.01 3.00 66.83 65.96 13,700.00 68.93 126.37 7,236.30 7,166.00 3.00 65.67 66.17 13,800.00 70.24 129.25 7,271.20 7,200.90 3.00 64.59 66.20 13,900.00 71.59 132.08 7,303.90 7,233.60 3.00 63.58 66.08 14,000.00 72.99 134.87 7,334.32 7,264.02 3.00 62.65 65.79 14,100.00 74.43 137.61 7,362.37 7,292.07 3.00 61.81 65.36 14,200.00 75.90 140.32 7,387.99 7,317.69 3.00 61.04 64.78 14,300.00 77.39 142.99 7,411.09 7,340.79 3.00 60.34 64.05 14,400.00 78.92 145.63 7,431.61 7,361.31 3.00 59.73 63.20 14,500.00 80.47 148.24 7,449.51 7,379.21 3.00 59.18 62.21 14,600.00 82.03 150.83 7,464.72 7,394.42 3.00 58.72 61.10 14,700.82 83.63 153.42 7,477.30 7,407.00 3.00 58.32 59.86 14,800.00 83.63 153.42 7,488.30 7,418.00 0.00 0.00 60.26 14,900.00 83.63 153.42 7,499.40 7,429.10 0.00 0.00 60.74 14,926.15 83.63 153.42 7,502.30 7,432.00 0.00 0.00 60.86 14,926.47 83.63 153.42 7,502.34 7,432.04 1.00 -74.88 60.86 15,000.00 83.63 153.42 7,510.49 7,440.19 0.00 0.00 61.23 15,100.00 83.63 153.42 7,521.59 7,451.29 0.00 0.00 61.72 15,200.00 83.63 153.42 7,532.68 7,462.38 0.00 0.00 62.21 15,300.00 83.63 153.42 7,543.77 7,473.47 0.00 0.00 62.69 15,400.00 83.63 153.42 7,554.87 7,484.57 0.00 0.00 63.18 15,500.00 83.63 153.42 7,565.96 7,495.66 0.00 0.00 63.68 15,600.00 83.63 153.42 7,577.05 7,506.75 0.00 0.00 64.17 15,700.00 83.63 153.42 7,588.15 7,517.85 0.00 0.00 64.66 15,714.49 83.63 153.42 7,589.75 7,519.45 0.00 0.00 64.74 15,809.06 86.00 151.85 7,598.30 7,528.00 3.00 -33.46 66.23 7-5/8"X 9-7/8"by 10-1/2" 15,829.06 86.00 151.85 7,599.70 7,529.40 0.00 -33.32 66.36 15,900.00 88.13 151.85 7,603.33 7,533.03 3.00 0.00 66.83 15,943.89 89.44 151.85 7,604.26 7,533.96 3.00 0.00 67.12 16,000.00 89.44 151.85 7,604.80 7,534.50 0.00 0.00 67.51 16,100.00 89.44 151.85 7,605.77 7,535.47 0.00 0.00 68.23 16,200.00 89.44 151.85 7,606.74 7,536.44 0.00 0.00 68.97 16,300.00 89.44 151.85 7,607.71 7,537.41 0.00 0.00 69.74 16,400.00 89.44 151.85 7,608.68 7,538.38 0.00 0.00 70.54 16,500.00 89.44 151.85 7,609.65 7,539.35 0.00 0.00 71.37 16,600.00 89.44 151.85 7,610.62 7,540.32 0.00 0.00 72.22 16,700.00 89.44 151.85 7,611.59 7,541.29 0.00 0.00 73.10 5/3/2017 3:55:00PM Page 6 COMPASS 5000.1 Build 74 • . Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLeg TFace Lat.Error (usft) (°) (°) (usft) (usft) (°/100usft) (°) (usft) 16,800.00 89.44 151.85 7,612.55 7,542.25 0.00 0.00 74.00 16,900.00 89.44 151.85 7,613.52 7,543.22 0.00 0.00 74.93 17,000.00 89.44 151.85 7,614.49 7,544.19 0.00 0.00 75.87 17,100.00 89.44 151.85 7,615.46 7,545.16 0.00 0.00 76.84 17,200.00 89.44 151.85 7,616.43 7,546.13 0.00 0.00 77.83 17,300.00 89.44 151.85 7,617.40 7,547.10 0.00 0.00 78.84 17,400.00 89.44 151.85 7,618.37 7,548.07 0.00 0.00 69.53 17,500.00 89.44 151.85 7,619.34 7,549.04 0.00 0.00 69.78 17,600.00 89.44 151.85 7,620.31 7,550.01 0.00 0.00 70.04 17,700.00 89.44 151.85 7,621.28 7,550.98 0.00 0.00 70.30 17,800.00 89.44 151.85 7,622.25 7,551.95 0.00 0.00 70.57 17,900.00 89.44 151.85 7,623.22 7,552.92 0.00 0.00 70.84 18,000.00 89.44 151.85 7,624.18 7,553.88 0.00 0.00 71.11 18,100.00 89.44 151.85 7,625.15 7,554.85 0.00 0.00 71.39 18,200.00 89.44 151.85 7,626.12 7,555.82 0.00 0.00 71.67 18,300.00 89.44 151.85 7,627.09 7,556.79 0.00 0.00 71.95 18,400.00 89.44 151.85 7,628.06 7,557.76 0.00 0.00 72.24 18,500.00 89.44 151.85 7,629.03 7,558.73 0.00 0.00 72.53 18,600.00 89.44 151.85 7,630.00 7,559.70 0.00 0.00 72.83 18,700.00 89.44 151.85 7,630.97 7,560.67 0.00 0.00 73.13 18,800.00 89.44 151.85 7,631.94 7,561.64 0.00 0.00 73.43 18,900.00 89.44 151.85 7,632.91 7,562.61 0.00 0.00 73.73 19,000.00 89.44 151.85 7,633.88 7,563.58 0.00 0.00 74.04 19,100.00 89.44 151.85 7,634.85 7,564.55 0.00 0.00 74.35 19,200.00 89.44 151.85 7,635.81 7,565.51 0.00 0.00 74.67 19,300.00 89.44 151.85 7,636.78 7,566.48 0.00 0.00 74.99 19,400.00 89.44 151.85 7,637.75 7,567.45 0.00 0.00 75.31 19,500.00 89.44 151.85 7,638.72 7,568.42 0.00 0.00 75.63 19,600.00 89.44 151.85 7,639.69 7,569.39 0.00 0.00 75.96 19,700.00 89.44 151.85 7,640.66 7,570.36 0.00 0.00 76.29 19,800.00 89.44 151.85 7,641.63 7,571.33 0.00 0.00 76.62 19,900.00 89.44 151.85 7,642.60 7,572.30 0.00 0.00 76.96 20,000.00 89.44 151.85 7,643.57 7,573.27 0.00 0.00 77.29 20,100.00 89.44 151.85 7,644.54 7,574.24 0.00 0.00 77.64 20,200.00 89.44 151.85 7,645.51 7,575.21 0.00 0.00 77.98 20,300.00 89.44 151.85 7,646.48 7,576.18 0.00 0.00 78.33 20,400.00 89.44 151.85 7,647.44 7,577.14 0.00 0.00 78.68 20,500.00 89.44 151.85 7,648.41 7,578.11 0.00 0.00 79.03 20,600.00 89.44 151.85 7,649.38 7,579.08 0.00 0.00 79.38 20,700.00 89.44 151.85 7,650.35 7,580.05 0.00 0.00 79.74 20,800.00 89.44 151.85 7,651.32 7,581.02 0.00 0.00 80.10 20,900.00 89.44 151.85 7,652.29 7,581.99 0.00 0.00 80.47 21,000.00 89.44 151.85 7,653.26 7,582.96 0.00 0.00 80.83 21,100.00 89.44 151.85 7,654.23 7,583.93 0.00 0.00 81.20 5/32017 3:55:00PM Page 7 COMPASS 5000.1 Build 74 • . Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature iI Design: CD5-17wp11 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLeg TFace Lat.Error (usft) (0) (0) (usft) (usft) (*MOO usft) (0) (usft) 21,200.00 89.44 151.85 7,655.20 7,584.90 0.00 0.00 81.57. 21,300.00 89.44 151.85 7,656.17 7,585.87 0.00 0.00 81.94 21,400.00 89.44 151.85 7,657.14 7,586.84 0.00 0.00 82.32 21,500.00 89.44 151.85 7,658.10 7,587.80 0.00 0.00 82.69 21,600.00 89.44 151.85 7,659.07 7,588.77 0.00 0.00 83.07 21,700.00 89.44 151.85 7,660.04 7,589.74 0.00 0.00 83.46 21,800.00 89.44 151.85 7,661.01 7,590.71 0.00 0.00 83.84 21,900.00 89.44 151.85 7,661.98 7,591.68 0.00 0.00 84.23 22,000.00 89.44 151.85 7,662.95 7,592.65 0.00 0.00 84.61 22,100.00 89.44 151.85 7,663.92 7,593.62 0.00 0.00 85.01 22,200.00 89.44 151.85 7,664.89 7,594.59 0.00 0.00 85.40 22,300.00 89.44 151.85 7,665.86 7,595.56 0.00 0.00 85.79 22,400.00 89.44 151.85 7,666.83 7,596.53 0.00 0.00 86.19 22,500.00 89.44 151.85 7,667.80 7,597.50 0.00 0.00 86.59 22,600.00 89.44 151.85 7,668.77 7,598.47 0.00 0.00 86.99 22,700.00 89.44 151.85 7,669.73 7,599.43 0.00 0.00 87.39 22,800.00 89.44 151.85 7,670.70 7,600.40 0.00 0.00 87.80 22,900.00 89.44 151.85 7,671.67 7,601.37 0.00 0.00 88.21 23,000.00 89.44 151.85 7,672.64 7,602.34 0.00 0.00 88.61 23,100.00 89.44 151.85 7,673.61 7,603.31 0.00 0.00 89.02 23,200.00 89.44 151.85 7,674.58 7,604.28 0.00 0.00 89.44 23,300.00 89.44 151.85 7,675.55 7,605.25 0.00 0.00 89.85 23,400.00 89.44 151.85 7,676.52 7,606.22 0.00 0.00 90.27 23,500.00 89.44 151.85 7,677.49 7,607.19 0.00 0.00 90.69 23,600.00 89.44 151.85 7,678.46 7,608.16 0.00 0.00 91.11 23,700.00 89.44 151.85 7,679.43 7,609.13 0.00 0.00 91.53 23,800.00 89.44 151.85 7,680.40 7,610.10 0.00 0.00 91.95 23,900.00 89.44 151.85 7,681.36 7,611.06 0.00 0.00 92.38 24,000.00 89.44 151.85 7,682.33 7,612.03 0.00 0.00 92.80 24,100.00 89.44 151.85 7,683.30 7,613.00 0.00 0.00 93.23 24,200.00 89.44 151.85 7,684.27 7,613.97 0.00 0.00 93.66 24,300.00 89.44 151.85 7,685.24 7,614.94 0.00 0.00 94.09 24,400.00 89.44 151.85 7,686.21 7,615.91 0.00 0.00 94.52 24,500.00 89.44 151.85 7,687.18 7,616.88 0.00 0.00 94.96 24,600.00 89.44 151.85 7,688.15 7,617.85 0.00 0.00 95.39 24,700.00 89.44 151.85 7,689.12 7,618.82 0.00 0.00 95.83 24,800.00 89.44 151.85 7,690.09 7,619.79 0.00 0.00 96.27 24,900.00 89.44 151.85 7,691.06 7,620.76 0.00 0.00 96.71 25,000.00 89.44 151.85 7,692.03 7,621.73 0.00 0.00 97.15 25,100.00 89.44 151.85 7,692.99 7,622.69 0.00 0.00 97.60 25,200.00 89.44 151.85 7,693.96 7,623.66 0.00 0.00 98.04 25,300.00 89.44 151.85 7,694.93 7,624.63 0.00 0.00 98.49 25,400.00 89.44 151.85 7,695.90 7,625.60 0.00 0.00 98.94 25,500.00 89.44 151.85 7,696.87 7,626.57 0.00 0.00 99.38 25,600.00 89.44 151.85 7,697.84 7,627.54 0.00 0.00 99.83 5/3/2017 3:55:00PM Page 8 COMPASS 5000.1 Build 74 • • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLeg TFace Lat.Error (usft) (°) (°) (usft) (usft) 0100usft) (°) (usft) 25,700.00 89.44 151.85 7,698.81 7,628.51 0.00 0.00 100.29 25,800.00 89.44 151.85 7,699.78 7,629.48 0.00 0.00 100.74 25,900.00 89.44 151.85 7,700.75 7,630.45 0.00 0.00 101.19 26,000.00 89.44 151.85 7,701.72 7,631.42 0.00 0.00 101.65 26,100.00 89.44 151.85 7,702.69 7,632.39 0.00 0.00 102.10 26,200.00 89.44 151.85 7,703.66 7,633.36 0.00 0.00 102.56 26,300.00 89.44 151.85 7,704.62 7,634.32 0.00 0.00 103.02 26,400.00 89.44 151.85 7,705.59 7,635.29 0.00 0.00 103.48 26,500.00 89.44 151.85 7,706.56 7,636.26 0.00 0.00 103.94 26,600.00 89.44 151.85 7,707.53 7,637.23 0.00 0.00 104.41 26,700.00 89.44 151.85 7,708.50 7,638.20 0.00 0.00 104.87 26,800.00 89.44 151.85 7,709.47 7,639.17 0.00 0.00 105.33 26,900.00 89.44 151.85 7,710.44 7,640.14 0.00 0.00 105.80 27,000.00 89.44 151.85 7,711.41 7,641.11 0.00 0.00 106.27 27,100.00 89.44 151.85 7,712.38 7,642.08 0.00 0.00 106.74 27,195.19 89.44 151.85 7,713.30 7,643.00 0.00 0.00 107.18 27,200.00 89.49 151.85 7,713.34 7,643.04 1.00 0.00 107.20 27,300.00 90.49 151.85 7,713.36 7,643.06 1.00 0.00 107.67 27,400.00 91.49 151.85 7,711.62 7,641.32 1.00 0.00 108.15 27,500.00 92.49 151.85 7,708.15 7,637.85 1.00 0.00 108.62 27,535.19 92.84 151.85 7,706.51 7,636.21 1.00 0.00 108.78 27,600.00 92.84 151.85 7,703.29 7,632.99 0.00 0.00 109.09 27,700.00 92.84 151.85 7,698.33 7,628.03 0.00 0.00 109.56 27,800.00 92.84 151.85 7,693.37 7,623.07 0.00 0.00 110.04 27,900.00 92.84 151.85 7,688.40 7,618.10 0.00 0.00 110.52 28,000.00 92.84 151.85 7,683.44 7,613.14 0.00 0.00 110.99 28,100.00 92.84 151.85 7,678.48 7,608.18 0.00 0.00 111.47 28,195.19 92.84 151.85 7,673.75 7,603.45 0.00 0.00 111.93 5/3/2017 3:55:00PM Page 9 COMPASS 5000.1 Build 74 i • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (••) (••) 115.30 115.30 20"x 42" 20 42 2,224.15 2,185.30 10-3/4"x 13-1/2" 10-3/4 13-1/2 15,809.06 7,598.30 7-5/8"X 9-7/8"by 10-1/2" 7-5/8 10-1/2 28,195.19 7,673.75 4-1/2"x6-3/4" 4-1/2 6-3/4 Formations Measured Vertical Dip Depth Depth Dip Direction (usft) (usft) Name Lithology (°) (°) 2,375.58 2,321.10 C-30 0.00 5,802.43 4,038.30 K-2 10,371.97 5,891.70 Albian 96 14,790.95 7,487.30 Alpine C 13,894.95 7,302.30 LCU 14,817.99 7,490.30 UJU 15,809.06 7,598.30 AlpineA 14,926.15 7,502.30 CD5-17L1 TOW 5,966.14 4,104.70 K-2 Base 1,322.61 1,320.30 Base Permafrost 0.00 13,166.35 7,025.10 FCS Top 7,728.47 4,819.50 Albian 97 3,063.15 2,854.30 C-10 0.00 13,882.38 7,298.30 Kuparuk C 5,228.21 3,805.40 K-3 0.00 13,560.90 7,184.30 Kalubik Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 500.00 500.00 0.00 0.00 Start Build 1.50 600.01 600.00 1.29 0.23 Start Build 2.00 750.23 750.00 9.04 1.59 Start DLS 2.00 TFO 140.00 1,272.17 1,270.30 8.23 32.40 Start 100.88 hold at 1272.17 MD 1,373.04 1,370.30 0.12 42.90 Start DLS 2.00 TFO-7.82 2,224.15 2,185.30 -129.17 238.15 Start 20.00 hold at 2224.15 MD 2,244.15 2,203.49 -133.59 245.18 Start DLS 3.00 TFO-3.74 3,630.07 3,157.19 -620.01 1,076.93 Start 9837.17 hold at 3630.07 MD 13,467.24 7,147.14 -5,043.77 8,905.12 Start DLS 3.00 TFO 67.23 14,700.82 7,477.30 -5,899.29 9,697.98 Start 225.33 hold at 14700.82 MD 14,926.47 7,502.34 -6,099.85 9,798.33 Start 788.02 hold at 14926.47 MD • 15,714.49 7,589.75 -6,800.21 10,148.79 Start DLS 3.00 TFO-33.46 15,809.06 7,598.30 -6,883.85 10,192.08 Start 20.00 hold at 15809.06 MD 15,829.06 7,599.70 -6,901.44 10,201.49 Start DLS 3.00 TFO 0.00 15,943.89 7,604.26 -7,002.59 10,255.62 Start 11251.30 hold at 15943.89 MD 27,195.19 7,713.30 -16,922.50 15,563.64 Start Build 1.00 27,535.19 7,706.51 -17,222.18 15,724.00 Start 660.00 hold at 27535.19 MD 28,195.19 7,673.75 -17,803.39 16,035.00 TD at 28195.19 Checked By: Approved By: Date: 5/3/2017 3:55:00PM Page 10 COMPASS 5000.1 Build 74 AC Summary • • I, ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: CD5-17 '°� Rig: CD5-17 It 501032075400 CD5-17wp11 (Toe Up) 1 ,u ,P Minor Risked r Clearance Summary Anticollision Report 03 May,2017 Tray.Cylinder North Proximity Scan on Current Survey Data(North Reference) a Reference Design: CD5 Alpine West Pad-Rig:CD5-17-Rig:CD5-17-CD5-17wp11(Toe Up) Well Coordinates: 5,965,575.11 N,1,489,264.31 E(70°18'48.24"N,151°13'30.32"W) EN Datum Height: Plan:34+36.3 @ 70.30usft(Doyon 19) gi. " Scan Range: 0.00 to 28,195.19 usft.Measured Depth. iii ,a` Scan Radius is 3,015.89 usft.Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Geodetic Scale FactorApplied i? Version: 5000.1 Build: 74 _ Scan Type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Scan Type: 25.00 41 Iii II • Anticollision Report for Rig: CD5-17 -CD5-17wp11 (Toe Up) Tray.Cylinder North Proximity Scan on Current Survey Data(North Reference) Reference Design: CD5 Alpine West Pad-Rig:CD5-17-Rig:CD5-17-CD5-17wp11(Toe Up) Scan Range: 0.00 to 28,195.19 usft.Measured Depth. Scan Radius is 3,015.89 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name-Wellbore Name-Design (usft) (usft) (usft) (usft) usft CD4 Nanuq Pad CD4-321-CD4-321-CD4-321 21,525.73 222.56 21,525.73 221.91 18,800.00 344.071 Clearance Factor Pass-Minor 1/50 CD4-322-CD4-322-CD4-322 16,240.88 1,525.91 16,240.88 1,156.03 19,450.00 4.125 Clearance Factor Pass-Major Risk CD5 Alpine West Pad CD5-02-CD5-02-CD5-02 49.39 300.19 49.39 297.23 50.00 101.275 Centre Distance Pass-Major Risk CD5-02-CD5-02-CD5-02 988.61 300.59 988.61 284.44 975.00 18.614 Clearance Factor Pass-Major Risk CD5-02-CD5-02A-CD5-02A 49.39 300.19 49.39 297.61 50.00 116.412 Centre Distance Pass-Major Risk CD5-02-CD5-02A-CD5-02A 988.61 300.59 988.61 284.44 975.00 18.614 Clearance Factor Pass-Major Risk CD5-03-CD5-03-CD5-03 885.13 273.23 885.13 258.88 875.00 19.051 Centre Distance Pass-Major Risk CD5-03-CD5-03-CD5-03 959.25 273.77 959.25 258.34 950.00 17.743 Clearance Factor Pass-Major Risk CD5-04-CD5-04-CD5-04 399.16 259.04 399.16 243.87 400.00 17.084 Clearance Factor Pass-Major Risk CD5-04-CD5-04-CD5-04 757.15 257.74 757.15 245.46 750.00 20.988 Centre Distance Pass-Major Risk CD5-05-CD5-05-CD5-05 984.92 236.02 984.92 218.80 975.00 13.709 Centre Distance Pass-Major Risk CD5-05-CD5-05-CD5-05 1,009.69 236.26 1,009.69 218.64 1,000.00 13.407 Clearance Factor Pass-Major Risk CD5-06-CD5-06-CD5-06 883.24 217.56 883.24 202.43 875.00 14.376 Centre Distance Pass-Major Risk CD5-06-CD5-06-CD5-06 932.93 217.83 932.93 201.84 925.00 13.625 Clearance Factor Pass-Major Risk CD5-06-CD5-06L1-CD5-06L1 883.24 217.56 883.24 202.43 875.00 14.376 Centre Distance Pass-Major Risk CD5-06-CD5-06L1-CD5-06L1 932.93 217.83 932.93 201.84 925.00 13.625 Clearance Factor Pass-Major Risk CD5-07-CD5-07-CD5-07 934.28 190.74 934.28 175.20 925.00 12.278 Centre Distance Pass-Major Risk CD5-07-CD5-07-CD5-07 1,035.93 191.43 1,035.93 174.57 1,025.00 11.356 Clearance Factor Pass-Major Risk CD5-08-CD5-08-CD5-08 931.94 171.64 931.94 156.55 925.00 11.372 Centre Distance Pass-Major Risk CD5-08-CD5-08-CD5-08 13,900.00 336.57 13,900.00 144.89 20,150.00 1.756 Clearance Factor Pass-Major Risk CD5-09-CD5-09-CD5-09 929.07 156.25 929.07 140.99 925.00 10.238 Centre Distance Pass-Major Risk CD5-09-CD5-09-CD5-09 953.31 156.37 953.31 140.74 950.00 10.010 Clearance Factor Pass-Major Risk CD5-10-CD5-10-CD5-10 828.85 134.62 828.85 120.72 825.00 9.690 Centre Distance Pass-Major Risk CD5-10-CD5-10-CD5-10 854.05 134.90 854.05 120.62 850.00 9.452 Clearance Factor Pass-Major Risk CD5-11-CD5-11-CD5-11 1,281.18 90.51 1,281.18 70.88 1,275.00 4.612 Centre Distance Pass-Major Risk CD5-11-CD5-11-CD5-11 1,305.69 90.81 1,305.69 70.84 1,300.00 4.547 Clearance Factor Pass-Major Risk 03 May,2017- 9:42 Page 2 of 8 COMPASS • • Anticollision Report for Rig: CD5-17-CD5-17wp11 (Toe Up) Tray.Cylinder North Proximity Scan on Current Survey Data(North Reference) Reference Design: CD5 Alpine West Pad-Rig:CD5-17-Rig:CD5-17-CD5-17wp11(Toe Up) Scan Range: 0.00 to 28,195.19 usft.Measured Depth. Scan Radius is 3,015.89 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name-Wellbore Name-Design (usft) (usft) (usft) (usft) usft CD5-12-CD5-12-CD5-12 929.17 95.70 929.17 80.68 925.00 6.371 Centre Distance Pass-Major Risk CD5-12-CD5-12-CD5-12 978.87 96.07 978.87 80.36 975.00 6.114 Clearance Factor Pass-Major Risk CD5-18-CD5-18-CD5-18 224.47 18.87 224.47 10.62 225.00 2.288 Centre Distance Pass-Major Risk CD5-18-CD5-18-CD5-18 324.24 20.75 324.24 8.50 325.00 1.695 Clearance Factor Pass-Major Risk CD5-18-CD5-18L1-CD5-18L1 224.47 18.87 224.47 10.62 225.00 2.288 Centre Distance Pass-Major Risk CD5-18-CD5-18L1-CD5-18L1 324.24 20.75 324.24 8.50 325.00 1.695 Clearance Factor Pass-Major Risk CD5-20-CD5-20-CD5-20 50.02 59.84 50.02 56.86 50.00 20.068 Centre Distance Pass-Major Risk CD5-20-CD5-20-CD5-20 399.98 61.51 399.98 46.19 400.00 4.016 Clearance Factor Pass-Major Risk CD5-20-CD5-20L1-CD5-20L1 50.02 59.84 50.02 56.86 50.00 20.068 Centre Distance Pass-Major Risk CD5-20-CD5-20L1-CD5-20L1 399.98 61.51 399.98 46.19 400.00 4.016 Clearance Factor Pass-Major Risk CD5-21-CD5-21-CD5-21 184.00 80.05 184.00 73.41 175.00 12.052 Centre Distance Pass-Major Risk CD5-21-CD5-21-CD5-21 384.00 80.61 384.00 65.90 375.00 5.478 Clearance Factor Pass-Major Risk CD5-21-Plan:CD5-21A-CD5-21Awp10(13B) 175.20 80.05 175.20 73.80 175.00 12.802 Centre Distance Pass-Major Risk CD5-21-Plan:CD5-21A-CD5-21Awp10(13B) 400.20 80.68 400.20 65.35 400.00 5.262 Clearance Factor Pass-Major Risk CD5-313-CD5-313-CD5-313 725.23 74.21 725.23 62.06 725.00 6.109 Centre Distance Pass-Major Risk CD5-313-CD5-313-CD5-313 775.00 74.63 775.00 61.62 775.00 5.737 Clearance Factor Pass-Major Risk CD5-313-CD5-313PB1-CD5-313PB1 725.23 74.21 725.23 62.06 725.00 6.109 Centre Distance Pass-Major Risk CD5-313-CD5-313PB1-CD5-313PB1 775.00 74.63 775.00 61.62 775.00 5.737 Clearance Factor Pass-Major Risk CD5-314-CD5-314-CD5-314 773.89 53.11 773.89 40.43 775.00 4.189 Centre Distance Pass-Major Risk CD5-314-CD5-314-CD5-314 798.87 53.25 798.87 40.17 800.00 4.070 Clearance Factor Pass-Major Risk CD5-315-CD5-315-CD5-315 823.96 28.50 823.96 14.55 825.00 2.043 Centre Distance Pass-Major Risk CD5-315-CD5-315-CD5-315 848.80 28.89 848.80 14.51 850.00 2.010 Clearance Factor Pass-Major Risk CD5-315-CD5-315PB1-CD5-315PB1 823.96 28.50 823.96 14.55 825.00 2.043 Centre Distance Pass-Major Risk CD5-315-CD5-315PB1-CD5-315PB1 848.80 28.89 848.80 14.51 850.00 2.010 Clearance Factor Pass-Major Risk CD5-99-CD5-99-CD5-99 939.41 332.11 939.41 316.79 925.00 21.687 Centre Distance Pass-Major Risk CD5-99-CD5-99-CD5-99 1,016.67 332.60 1,016.67 316.11 1,000.00 20.169 Clearance Factor Pass-Major Risk CD5-99-CD5-99A-CD5-99A 939.41 332.11 939.41 316.79 925.00 21.687 Centre Distance Pass-Major Risk CD5-99-CD5-99A-CD5-99A 14,464.15 470.80 14,464.15 169.62 14,025.00 1.563 Clearance Factor Pass-Major Risk CD5-99-CD5-99AL1-CD5-99AL1 939.41 332.11 939.41 316.79 925.00 21.687 Centre Distance Pass-Major Risk CD5-99-CD5-99AL1-CD5-99AL1 14,464.15 470.80 14,464.15 169.64 14,025.00 1.563 Clearance Factor Pass-Major Risk 03 May,2017- 9:42 Page 3 of 8 COMPASS • • Anticollision Report for Rig: CD5-17 -CD5-17wp11 (Toe Up) Tray.Cylinder North Proximity Scan on Current Survey Data(North Reference) Reference Design: CD5 Alpine West Pad-Rig:CD5-17-Rig:CD5-17-CD5-17wp11(Toe Up) Scan Range: 0.00 to 28,195.19 usft.Measured Depth. Scan Radius is 3,015.89 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name-Wellbore Name-Design (usft) (usft) (usft) (usft) usft Plan:CD5-19-Plan:CD5-19-CD5-19wp08(8D) 400.10 39.87 400.10 24.51 400.00 2.596 Clearance Factor Pass-Major Risk Plan:CD5-19-Plan:CD5-19-CD5-19wp08(8D) 475.10 39.87 475.10 29.38 475.00 3.801 Centre Distance Pass-Major Risk Plan:CD5-19-Plan:CD5-19L1-CD5-19L1wp08(8D) 400.10 39.87 400.10 24.51 400.00 2.596 Clearance Factor Pass-Major Risk Plan:CD5-19-Plan:CD5-19L1-CD5-19L1wp08(8D) 475.10 39.87 475.10 29.38 475.00 3.801 Centre Distance Pass-Major Risk Plan:CD5-22-Plan:CD5-22-CD5-22wp07(9A) 400.30 99.88 400.30 84.53 400.00 6.509 Clearance Factor Pass-Major Risk Plan:CD5-22-Plan:CD5-22-CD5-22wp07(9A) 475.30 99.88 475.30 89.40 475.00 9.534 Centre Distance Pass-Major Risk Plan:CD5-23-Plan:CD5-23-CD5-23wp04(10BC) 400.30 119.96 400.30 104.62 400.00 7.818 Clearance Factor Pass-Major Risk Plan:CD5-23-Plan:CD5-23-CD5-23wp04(10BC) 475.30 119.96 475.30 109.49 475.00 11.451 Centre Distance Pass-Major Risk Plan:CD5-24-Plan:CD5-24-CD5-24wp06(9C) 400.30 139.86 400.30 124.51 400.00 9.114 Clearance Factor Pass-Major Risk Plan:CD5-24-Plan:CD5-24-CD5-24wp06(9C) 475.30 139.86 475.30 129.38 475.00 13.350 Centre Distance Pass-Major Risk Plan:CD5-314X-Plan:CD5-314X-CD5-314Xwp08 674.49 49.18 674.49 37.67 675.00 4.275 Centre Distance Pass-Major Risk Plan:CD5-314X-Plan:CD5-314X-CD5-314Xwp08 699.09 49.41 699.09 37.49 700.00 4.143 Clearance Factor Pass-Major Risk Plan:CD5-316-Plan:CD5-316-CD5-316wp03.1 399.50 20.01 399.50 4.66 400.00 1.304 Clearance Factor Pass-Major Risk Plan:CD5-316-Plan:CD5-316-CD5-316wp03.1 649.25 16.48 649.25 5.49 650.00 1.500 Centre Distance Pass-Major Risk Plan:CD5-316-Plan:CD5-316PB1-CD5-316PB1wp0 399.50 20.01 399.50 4.66 400.00 1.304 Clearance Factor Pass-Major Risk Plan:CD5-316-Plan:CD5-316PB1-CD5-316PB1wp0 649.25 16.48 649.25 5.49 650.00 1.500 Centre Distance Pass-Major Risk Prelim:CD5-25-Prelim:CD5-25-CD5-25wp06(10AB 400.30 159.96 400.30 144.61 400.00 10.425 Clearance Factor Pass-Major Risk Prelim:CD5-25-Prelim:CD5-25-CD5-25wp06(10AB 475.30 159.96 475.30 149.48 475.00 15.269 Centre Distance Pass-Major Risk Prelim:CD5-26-Prelim:CD5-26-CD5-26wp02(14B) 400.30 179.90 400.30 164.56 400.00 11.724 Clearance Factor Pass-Major Risk Prelim:CD5-26-Prelim:CD5-26-CD5-26wp02(14B) 475.30 179.90 475.30 169.42 475.00 17.172 Centre Distance Pass-Major Risk Prelim:CD5-27-Prelim:CD5-27-CD5-27wp02(15A) 400.30 199.85 400.30 184.51 400.00 13.025 Clearance Factor Pass-Major Risk Prelim:CD5-27-Prelim:CD5-27-CD5-27wp02(15A) 475.30 199.85 475.30 189.38 475.00 19.077 Centre Distance Pass-Major Risk Prelim:CD5-28-Prelim:CD5-28-CD5-28wp02(15B) 400.40 219.99 400.40 204.65 400.00 14.343 Clearance Factor Pass-Major Risk Prelim:CD5-28-Prelim:CD5-28-CD5-28wp02(15B) 475.40 219.99 475.40 209.52 475.00 21.013 Centre Distance Pass-Major Risk Prelim:CD5-29-Prelim:CD5-29-CD5-29wp02(14C) 400.40 239.88 400.40 224.54 400.00 15.640 Clearance Factor Pass-Major Risk Prelim:CD5-29-Prelim:CD5-29-CD5-29wp02(14C) 475.40 239.88 475.40 229.41 475.00 22.913 Centre Distance Pass-Major Risk Prelim:CD5-88-Prelim:CD5-88-CD5-88wp03(11B) 3,011.89 348.40 3,011.89 301.53 2,800.00 7.433 Centre Distance Pass-Major Risk Prelim:CD5-88-Prelim:CD5-88-CD5-88wp03(11B) 3,114.31 351.28 3,114.31 299.13 2,900.00 6.736 Clearance Factor Pass-Major Risk Prelim:CD5-90-Prelim:CD5-90-CD5-90wp05(110) 2,704.81 275.62 2,704.81 234.83 2,575.00 6.757 Centre Distance Pass-Major Risk Prelim:CD5-90-Prelim:CD5-90-CD5-90wp05(11C) 2,728.79 276.20 2,728.79 234.54 2,600.00 6.630 Clearance Factor Pass-Major Risk 03 May,2017- 9:42 Page 4 of 8 COMPASS • • Anticollision Report for Rig: CD5-17 -CD5-17wp11 (Toe Up) Tray.Cylinder North Proximity Scan on Current Survey Data(North Reference) Reference Design: CD5 Alpine West Pad-Rig:CD5-17-Rig:CD5-17-CD5-17wp11(Toe Up) Scan Range: 0.00 to 28,195.19 usft.Measured Depth. Scan Radius is 3,015.89 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name-Wellbore Name-Design (usft) (usft) (usft) (usft) usft Prelim:CD5-92-Prelim:CD5-92-CD5-92wp03(12C) 2,618.75 201.90 2,618.75 162.84 2,525.00 5.168 Centre Distance Pass-Major Risk Prelim:CD5-92-Prelim:CD5-92-CD5-92wp03(12C) 2,641.95 201.93 2,641.95 162.05 2,550.00 5.063 Clearance Factor Pass-Major Risk Prelim:CD5-94-Prelim:CD5-94-CD5-94wp04(Slive 2,509.74 220.28 2,509.74 183.30 2,425.00 5.958 Centre Distance Pass-Major Risk Prelim:CD5-94-Prelim:CD5-94-CD5-94wp04(Slive 2,533.72 220.80 2,533.72 183.23 2,450.00 5.877 Clearance Factor Pass-Major Risk Prelim:CD5-95-Prelim:CD5-95-CD5-95wp03(13A) 1,862.17 349.04 1,862.17 318.32 1,850.00 11.362 Centre Distance Pass-Major Risk Prelim:CD5-95-Prelim:CD5-95-CD5-95wp03(13A) 1,883.48 349.30 1,883.48 318.08 1,875.00 11.190 Clearance Factor Pass-Major Risk Prelim:CD5-96-Prelim:CD5-96-CD5-96wp04(Slive 2,254.83 212.01 2,254.83 178.33 2,200.00 6.295 Clearance Factor Pass-Major Risk Prelim:CD5-97-Prelim:CD5-97-CD5-97wp02(14A) 2,116.77 180.34 2,116.77 147.97 2,125.00 5.571 Clearance Factor Pass-Major Risk Prelim:CD5-98-Prelim:CD5-98-CD5-98wp04(13C) 2,045.26 203.59 2,045.26 172.15 2,025.00 6.476 Centre Distance Pass-Major Risk Prelim:CD5-98-Prelim:CD5-98-CD5-98wp04(13C) 2,069.23 203.76 2,069.23 172.12 2,050.00 6.440 Clearance Factor Pass-Major Risk Rig:CD5-17-Rig:CD5-17-Rig:CD5-17 MIMI - Rig:CD5-17-Rig:CD5-17-Rig:CD5-17 MM. - Survey tool program From To Survey/Plan Survey Tool (usft) (usft) 36.30 400.00 CD5-17wp11(Toe Up) INC 36.30 1,000.00 CD5-17wp11(Toe Up) GYD-GC-SS 1,000.00 2,000.00 CD5-17wp11(Toe Up) MWD 1,000.00 2,224.15 CD5-17wp11(Toe Up) MWD+IFR-AK-CAZ-SC 2,224.15 3,724.15 C05-17wp11(Toe Up) MWD 2,224.15 15,809.06 CD5-17wp11(Toe Up) MWD+IFR-AK-CAZ-SC 15,809.06 17,309.06 CD5-17wp11(Toe Up) MWD 15,809.06 28,195.19 CD5-17wp11(Toe Up) MWD+IFR-AK-CAZ-SC 03 May,2017- 9:42 Page 5 of 8 COMPASS • • Anticollision Report for Rig: CD5-17 -CD5-17wp11 (Toe Up) Ellipse error terms are correlated across survey tool tie-on points. Calculated ellipses incorporate surface errors. Separation is the actual distance between ellipsoids. Distance Between centres is the straight line distance between wellbore centres. Clearance Factor=Distance Between Profiles/(Distance Between Profiles-Ellipse Separation). All station coordinates were calculated using the Minimum Curvature method. 03 May,2017- 9:42 Page 6 of 8 COMPASS Ladder View • • Ladder View8 "aY °' 2B1 CD5-17wp11 The Reference Well is along the X-axis. Error Ellipses are the Sum of the Reference and Offset Well Errors. a 33 o1 L.3112- a comm® o OIMIIMIL%Xm U 300 ii I C o I e I E cz0. a) V t", 150 ika U L.0 L.m c U I)� '.Equlvelant Magnetic DIstatnceI ¢' 0 i 1 i I I I 1 1 1 1 -I I I I I l i I I I I I i I I I 1 0 4000 8000 12000 16000 20000 24000 28000 Displayed interval could be less than entire well:Measured Depth 36.30 To 28195.19 SURVEY PROGRAM CASING DETAILS Depth From Depth To Survey/Plan Tool TVD MD Name 36.30 400.00 CD5-17wp11 (Rig: CD5-17) INC 115.30 115.30 20"x 42" 36.30 1000.00 CD5-17wp11 (Rig: CD5-17) GYD-GC-SS 2185.30 2224.15 10-3/4"x 13-1/2" 1000.00 2000.00 CD5-17wp11 (Rig: CD5-17) MWD 7598.30 15809.D6/8"X 9-7/8"by 10-1/2" 1000.00 2224.15 CD5-17wp11 (Rig: CD5-17) MWD+IFR-AK-CAZ-SC 7673.75 28195.19 4-1/2"x 6-3/4" 2224.15 3724.15 CD5-17wp11 (Rig: CD5-17) MWD 2224.15 15809.06 CD5-17wp11 (Rig: CD5-17) MWD+IFR-AK-CAZ-SC 15809.06 17309.06 CD5-17wp11 (Rig: CD5-17) MWD ir,R(lq ns 2R1gr, 1q C.flr,-17wnll /Pin. C.flq-171 MWfI-0FR-AK-CA7-4C or m N. ES IL m i ii IN♦1 5, • 77,• • O O 2 2.2 2 U U U UUU U so b- 4 / 1, I�i�) 0 11�I gill M��Ilti 'rVi'I 1 20 4 I ,I t30 pi*(1' pc .2 cogi / 11 U /Equivelant Magnetic Distance i ---_-_-- --�-..- 0 1 I 1 I 1 I 1111 1111 1111 1111 111111 0 500 1000 1500 2000 2500 3000 3500 Partial Measured Depth TC View MD Inc Ar TVD 1% tot DIe9 TF4w vO% 799 30 00 0.00 0.00 36.30 000 0.00 0.00 0.00 0 00 42660 000 6.896 500.00 0.00 0.00 000 0.00 0.00 36 500 C D 5-1 7 w p 1 1 600.01 1.50 10.00 600.00 1.29 0 23 1.50 10.00 -1.03 750.23 4.50 10.00 750.00 9.04 1.59 200 0.00 423 1272.17 7.56 127.89 1270.30 8.23 32 40 200 140.00 7.94 500 690 36.30 To 28195.19 13]3.15 1.56 12219 2185.30 0.12 42.90 2.00 7.00 20.03 2224.15 24.53 122.19 2185.30 -129.11 238.15 2.00 -7.82 225.88 p 2244.15 24.53 122.19 2203.49 -133.59 245.18 000 0.00 233.06 690 070 3630.07 66.07 119.47 3157.19 -62001 1078.93 3.00 . 1053.02 13467.24 66 07 119.47 7147.14 -5043 7] 8905.12 0.00 0.00 8834.09 14700.82 63.83 153.42 7471.30 -589929 9697.98 3.00 6723 9181.69 1492.15 83.83 153.42 7502.30 409956 9798.18 0.00 0.00 9985.58 C05170011TOW 87U 1060 01111]OK O 10.34,May 03 2017 149266.47 83.63 153.42 7502.34 4099.85 9798 33 1.00 -74.88 998588 814 49 83.63 153.42 7589.75 -6800 21 0148.79 0.00 0.00 809.06 88.00 151 85 7598.30 4883.85 0192 08 3.00 -33.46 .80 1510862.97 005-17 01.068 011117 0K 1060 - 1 240 15829.06 86.00 151.85 7599.70 4901.44 0201.49 0.00 0.00 10882.92 SURVEY PROGRAM 15943.89 89.44 151.85 7604.28 -700259 0255.62 3.00 0.00 10997.64 1240 1430 27195.19 89.44 151.85 7713.30 -16922.50 5583.64 0.00 0.00 22248.37 C05-17 02.789 011117 OK [pIM1 Rom Depth To SurveylRan Tool 27535.19 92.84 151.85 7706.51 -17222.18 5724.00 1.00 0.00 22588.25 28195.19 9282 151.85 ]613.75 -1780339 8035.00 600 000 23247 13 36.30 400.00 C135-1742p11(flip:C135-17) INC 1430 1610 36.30 1000.00 025-1742811(Rip:CD5-17) GYDGC-SS 1000.00 2000.00 005.1746711(Rig:00617) MWD 1000.00 2224.15 00 8 517wp11(Rig:C05-17) MWD.IFR-AKLAZ-SC p 2224.15 3724.15 C05-1742711(Rig:CD517) MWD 1610 1800 2224.16 15809.06 0251T2711(Rig:00517) MW12.I8RAKGA25C 15809.06 17309.06 C0 0061.811(Rig:C13517) MWD 15809.06 2819619 005-1142,11(Rig:C06-17) MW.180.50CO2-SC 1800 2900 CASING DETAILS 2900 4000 TVD MD Name Size 4000 5100 115.30 115.30 20"x 42" 20 2185.30 2224.15 10-3/4"x 13-1/2" 10-3/4 7598.30 15909/00 ______9-7/8"by 10-1/2" 7-5/8 5100 6200 7673.75 28195.19 4-1/2"x 6-3/4' 4-1/2 6200 7300 7300 - 8400 8400 --------- 9500 9500 10600 10600 12800 0/360 12800 '" 15000 150 15000 17200 140 ,.�-/,` 17200 19400 -30/330 ":4140._::_4M� 130 p 719400 21600 't _44147141!'00',, 21600 23790 120 .ai�.,►-iitagf i,o 1"1�al►'11*-"(5"0®1\ 23790 26000 ‘/ 110 ��l10�:•1V�.�, �`� 100 ���:Os j4,�'( \Ilk 26000 _ 28195 iik-60/300 / T 80 t�'or404.�•',14 ` 60 '�� �� NNW 70 �6jolts.,8.6•,;+11; �► ac'i1't)b Y1„,-togat44. A,5,7441 50 .A!a��0!,. :, o 1 p6..© s i ��1,1x �i��I�®�'`.��/�f�I/�� 40 !r�'•.,� 1-'s Or eirAfili orI i I���t431 \ ,. 5aY -,,o,"--",/r 1�°io "` '4:N it Vie.o�IiA .t. A�kk P ,<* 21/5 3t .��r�)t.0 �r 1. arr�� �I�i w'� �' ""i`' 1"+ '-^24.89 +I. +sem'♦+ c EIZ'a.. . •40//,Pt+�1���! / 6 '� 1��ij1►89114 :tii,1♦ r4! �1,. -90/270 'r�4.:, 1+ i'i/s y �gi ,- M4-1;i, i`, ..:::';,t,'2...".a `.5t�' SrLrte�1 + %'.L�1��rtl11 , i.4tvi 4 _ L `i'-" -- r ti, ` N'tt. w+M-� 4� e1 90 PIM �� 1// r \® �N i � 1 � ,� `Y ..�rr'�- e.e i►1 � H4��r�4i CD5.2 . g •v ( r� , ia a11:'Ax?c...ji 1♦ ,,y1 +O�t: I e� ,*tea,- ,,,'4.--',::,,r,',CJI "� paw^ ® ®►SOA 41,4114,-10,1 I /104,7,...."4:061 7 \�II�'111//�t " +#, tr, 4 .*,....,..,-,1,4 V c ie t O♦woy`•d, P/ �� A . �\ e i / � 1 �'� 1 1_ ♦..fJll iel 1♦1T•-11 111��1wir a 9F a err i Vi` 4 > i '`tl ��s a j 1�li"6;44V 41� ,4 ®$-.: c -^;yr �� fix}'^t 44,;:•#;:f( i ~ -r /O . 1t1$Ir�� Ie r II • r y`r K'.9 .1 / 4 r 11� ,,t .� i .4 i4 rte/•sf2/ fj`zol 1e s1. 4.7 .� ) �' �� d♦ ? ✓* ��.ry • /� .I) ♦ ♦N 11�,�is .,+x, 4,.;;',2.;',,,i..,-':4,-/-1,.f �w`qz.•+ ,�L6/ iic. I diii.+e��1 ♦O.1'�/♦141 ;*, $,, a 1 ., .4: s Rem v ,I.‘r a ,i, tYs1/\ I •\�,,�♦ri / -. /y ia litteeigfif401, 1 iys 4 ?j ��1, .raq\ ♦�4 s. 5�. f 7/��� �7• vL:u��'fe '��I/1 jam%-"""T4 x °.�•00 :%e.l*\ �♦+e*� i - 4 it- 5896 Oa� ♦ !14 itlt f �iaa\ *4y ��ar �fi .-p+ ,1 -VCM s♦( »x'14• NAP .'�. '...,-----,<",:024* .a � C�♦d i Ie► �t� eat +:) � t. r.. �►q♦ O .t:..```.Nit !/...♦ ...i►Z .... ®A ®111 +. Jaw !♦1�/O 111 + `+7 ! ,1 P.;:�1- 1+.er."' 0 Lt, �.iVi CD5- ''!iia '� "'•q �r4.� / lid w "'� Y r 3®+ ♦♦i �•.:: iKC� 1t1♦i 4,4114,10;,;411Wit, -',47:,',110.14016.",/ s +.� 111Pi�rL1'®♦1G11 ad. ��1►►vu/s ♦" .w. ♦ Y1`�O,LWI -120/240 .4.! .4114,1114;,..„outrr�• lir,.= %1'' �..%,411`?a.p►...*, 120 s 5222 - C .`! / 4 ai®r 89895\iegtilliNkt`� _ . ��vte -s f. aA �. ..��=uu.4 r/►sikkValliblo v•zigil a 4,V 11R. ........,...401:„:..... . .�I _4 iii �4►.O. OQ+4% ®11 �!�pp�r�wtC®V►r'' lSt�i♦..�� t 'i*r4; J e ® `1/' M\\1s® ® e i \I°(1 71 i • AC Wells Only • Easting(4500 usft/in) fls17,May 0320t7i eds' 10D5„. Ds bid1a5 AA , I . - 1 - 1 „ „ 1 . . . . I . . . . 1 . - 1 - 1 - 1 - 1 „ „ i I ,�C wells ONLY NOT a spider) 05-04 CD- 0/ itt%A CD5 Alpine West Pad '� �J' .5-z, _ 7 � Z N 7 O _ CD5-05 rn— CD5-' 95�. ��•:CD5-17 cCC SCD5-2U• • : 08 :L CD4 Nanuq Pad:CD5-315P01 CD5-313P8 14-3 .4-3 CDS-313 CD5 8L1 CD5-99A — CD5-18- CD5-17wp11 CD5-315 1 1 h 1 1 , 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Easting(4500 usft/in) AC Flipbook 0 S casing Details Deptf Fwm Depth To Survey/Plan Tool C D ND MD Name 30.30 40oo.0o 0,5-17wp11(Rig:CO517) INC 5_ 7 215.30 15.3o 4x" 36.30 000 CD517wpn(m CD5-17) GVD SS 1+ x185.30 22x4.15 Io-311 x 13-1/0 00 CDS-17wp11(Rlg-CDS-17) MWD 7598.30 1580906 7-5/8"K9-7/8"by.0 IA'. 2224.15 CD5-17wp11(RIgi Cos-17) MWD.IFR-AK.CAZ-5C 1000.00 10oo.a0 7673.75 x819519 4-1/x"x 6-3/4" 2224.15 372415 CD5-17wp1I(Rig:CO5-17) MWD 36.3o To 1000.00 22x4.15 1580%06 CD5-IT+Pn(mg:CD5.17) MWD.IFR-AK{g2-SC 00 15809.06 tA0906 CDS-t7wpll(P)g:CDS-t7) MWD 365 I 52-5-- 2"9,9 C-5,P C..C.,5) MD Azi 0 / 360 5o0 690 36.30 0.00 690 87o 500.00 0.00 600.01 10.00 -30 / 33. 0 0 870 ,060 750.23 10.00 1060 1240 1272.17 127.69 1373.04 127.69 1240 1430 2224.15 122.19 60 1430 1610 2244.15 122.19 /y. 1610 1800 3630.07 119.47 -60 / 300t i,., 60 13467.24 119.47 1800 2900 14700.82 153.42 Ac; 2900 4000 14926.15 153.42 00 Kt 14926.47 153.42 5,14,\, 3 -- 4000 5100 C D „� o , e 15714.49 153.42 %I���.1 / / �, /"• ` �, q 1 5100 6200 4,1414-4••414/00.4. 4 15809.06 1 1.8 %� �, . ° 5 5 � iii+r 6200 7300 tib„ 9 15829.06 151.85 DSI��'ir wars 01701 f ��I/�� >J� R1�rr 'a ° .' ��A' 7300 8400 15943.89 151.85 - O2 0 �� /�' , g ' r aR .. ®rr�' 0 27195.19 151.85 9 / 7 W'1U �! /��1 l ( r� ta SLA'/� =«410100�1i 8400 9500 / F1 x .110.7, 114n���1 27535.19 151.85 l 'r' ,rt. ( F1r1i�`'�9'� c �s�,4). ®�F *4i �r �a ��sjll►. .; ,rr �o� 1 ���, 00 -_ 10600 28195.19 151.85 ,4 / V b �. '�4►:.�Ir��.�Q �j,/1�M4Vi 95 @} •J Q!\ ,. .. itiviStIVS;1111111'.1��41/0/ ®fid+��1 L.:• "' ''.:4"1.4a.1-'41*?'; aaw`c 1. ..11?;'`I.' .' fp7.1.1N II'_1/;".-:i ��P�_� 4 10600 12800 CD 21AW `'{� .���►••�, � ��+..� �.:w® Asx�.• t ' 12800 15000 5- -%i l 3�1�►1��a".0��, „eg,4�.►C�et���6,�.��� �%'� 1 000 1 200 -120 / �� a.//1� 120 17200 19400 CD5t-Tftw- y:� ��i�►1i 'v���:�rs /������= �' 19400 21600 ----- woe..,//• � $G ISII �i 2,600 23790 U „,X41 tat... �� a vw i pip4,10r/0017,, 23790 26000 _150 , 210 ,�►�!i%'j A � $ 26000 28195 -ivv i 1 0 10:42,May o3 2017 • S Casing Details Depth From Depth To Survey/Plan Tool CD5-17wp11 D MD xo"Name 36.30 400.00 C05-17wpi1(PigCDS-17) INC 215.30 115.30 248" 36.30 000 COS-+TW1+(Rig:CD5-17) GYDGC-55 x185.30 88x4.15 +x314"X 13-1h" 2000.00 CDYgwp+1(Rig:CDS t]) MWD 7598.30 15809.06 7-5/8"X9-7/8"by+o-+h" 2224.+5 CD5-R+N11(Rig:CD547) MWDa1FR-AK-CA2-SC 1000.00 To 20000.00 7673.75 28195.19 4�h"z 6.3/4" +80x4.+5 3714.15 CD5.17wpil Ig:CD5_7) MWD 1.9.6 1530906 CD5-17wpn(AIg:CDS-+7) MWDrIFR-AK- SC-SC 00 1580906 17329.26 CDS-1Jwp+1(Rig:CDS-I]) MWD 365 l8',,C -8,5.9 (85," fP n.0'3,) MD Azi 0 / 360 500 690 36.3o o.o0 690 87o 500.00 0.00 600.01 10.00 -30 / 331 90 0 870 1060 750.23 10.00 i '1\ 1060 1240 1272.17 127.69 IIS 1240 -1430 1373.04 127.69 ' ♦'� 2224.15 122.19 ��.'`• 1430 1610 2244.15 122.19 6 0 1��F�;•♦. ►4...`fir, 1610 1800 3630.07 119.47 -60 / 300 �/ y�1w"r1� 60 \,1 �A. 1800 2900 13467.24 119.47 \�► 14700.82 153.42 / toVie2900 4000 14926.15 153.42 At Ott 'TO At 14926.47 153.42r i 3 0 Q \"�1 �1� 4000 5100 / \I 5100 6200 15714.49 153.42 1r Q(;) ����i//O' 15809.06 151.85 r``l / •. oc �\` .ws 15829.06 151.85 u'2� `�?y 6200- 7300 15943.89 151.85 -90 / 270' 7300 8400 Rig: CD 9 0 27195.19 151.85 V � � �' o 5- 7 8400 9500 27535.19 151.85 = - `"4.'% 9500 10600 0 28195.19 151.85 \ \ .- �`c u y, 1060o 12800 0 12800 15000 � 15000 17200 rte. -120 / 240 /# �1,140 t120 17200 19400 1„ 1 i�� �� Sf���r:�� 19400 21600 eli ]�/ 'i�0"r M��i t�� 1%411'r� 21600 23790 lx 5- 9 ,'J�M/��0®/.0�il�:���®:\���., A379 - Ale • s ��\�.is 4,111 ,':.�=...• 0 0 26000 28195 CD5-316' . ,, •. �ii"-314Xwpo8 Eu 10:46,May 03 2017 0 • Casing Details Depth From Deptlr To Survey/Plan Tool CD5-l7wp11 TVD MD 2O x42"ame 36.30 4o00.0000 C175-17wpt1(Ilig CD517) INC 115.30 05.30 "x 4x" 36.30 000 CDS-+]WP+t(Rig:CDY+]) GYD-GC-55 ne5.30 1224./5 /o-3/4"x13-1/1" CD5-t7wpt/(Rig CD3-37) MWD 7598.30 15809.06 7-5/8"X99/8"by 10-1/0" lxss4+5 CD5-37w00(.4,CDS-/]) MWDAFR-RK{AZSC 1000.00 7673.75 2819519 4-U1"x6-314" 2224.15 3724.15 C05-17wp,1(Rig:CD5.i7) MWD 20000.00 To 28195.19 4./5:5.9" CD5-t wpn(tig CDS-/]) MWD IF0.AKU2-SC36 500 +5800.06 ]309CD547WPP(Rig CDS-,]) MWD(W 10 CD5..) MWDA.'1^YFAZ:C MD Azi 0 / 360 500 690 36.30 0.00 690 870 500.00 0.00 600.01 10.00 -30 / 33• 0 0 870 1060 750.23 10.00 1060 1240 1272.17 127.69 1240 1430 1373.04 127.69 2224.15 122.19 / .N../ \\ 1430 1610 __ 2244.15 122.19 6 0 /; 1610 1800 3630.07 119.47 -6o /3o0 r', 9 13467.24 119.47 / / ,J\ %� 6 0 1800 z o0 14700.82 153.42 /-.. ..,--'x 2900 4000 14926.15 153.42 1 ' -.,,,,y \ 4000 5100 14926.47 153.42 / 30 ` / 5100 6200 15714.49 153.42 fi J N 15809.06 151.85 �j/ / \ 15829.06 151.85 I I 6200 7300 15943.89 151.85 -90 / 2700 7300 8400 27195.19 151.85 ; \ �. 9 8400 9500 27535.19 151.85 hr_ \ \ - 28195.19I 151.85 .`r \ / 9500 10600 V_);/ V V "��// 10600 12800 \. \` /\ / - 0 N / j 112800 15000 � - % / 15000-----17200 "^ -120 / 240 i --- 120 17200 19400 �\ .., 6 f` 0 / \ \, 19400 21600 \ : k 1 21600 23790 \. j-- 23790 26000 -150 210 150 26000- 28195 90 -180180 10:54,May 03 2017 Errors Report • 0 ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: CD5-17 Rig: CD5-17 Plan: CD5-17wp11 Errors Report 03 May, 2017 0 S Errors Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 Project Western North Slope,North Slope Alaska,United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site CD5 Alpine West Pad Site Position: Northing: Latitude: From: Map Easting: Longitude: Position Uncertainty: 0.00 usft Slot Radius: 13-3/16" Grid Convergence: -1.15° Well Rig:CD5-17 Well Position +N/-S 0.00 usft Northing: Latitude: +E/-W 0.00 usft Easting: Longitude: Position Uncertainty 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 34.00 usft Wellbore Rig:CD5-17 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2016 4/22/2017 17.20 80.81 57,504 Design CD5-17wp11 Audit Notes: Version: Phase: PLAN Tie On Depth: 36.30 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 36.30 0.00 0.00 152.00 Survey Tool Program Date 5/3/2017 From To (usft) (usft) Survey(Wellbore) Tool Name Description -OA- 36.30 400.00 CD5-17wp11 (Rig:CD5-17) INC Inclinometer(Totco/Teledrift) 36.30 1,000.00 CD5-17wp11 (Rig:CD5-17) GYD-GC-SS Gyrodata gyro single shots 1,000.00 2,000.00 CD5-17wp11 (Rig:CD5-17) MWD MWD-Standard 1,000.00 2,224.15 CD5-17wp11 (Rig:CD5-17) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 2,224.15 3,724.15 CD5-17wp11 (Rig:CD5-17) MWD MWD-Standard 2,224.15 15,809.06 CD5-17wp11 (Rig:CD5-17) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 15,809.06 17,309.06 CD5-17wp11 (Rig:CD5-17) MWD MWD-Standard 15,809.06 28,195.19 CD5-17wp11 (Rig:CD5-17) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat Error Horz.Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 100.00 1.15 0.00 0.00 29.70 1.15 0.42 0.42 115.30 1.15 0.00 0.00 45.00 1.15 1.61 1.61 20"x 42" 200.00 1.15 0.00 0.00 129.70 1.15 1.61 1.61 300.00 1.15 0.00 0.00 229.70 1.15 2.65 2.65 400.00 1.15 0.00 0.00 329.70 1.15 3.67 3.67 5/3/2017 4:03:58PM Page 2 COMPASS 5000.1 Build 74 s • Errors Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (0) (0) (usft) (usft) (usft) (usft) 500.00 1.15 0.00 0.00 429.70 1.15 0.63 0.63 600.01 1.16 1.50 135.00 529.70 1.16 0.77 0.77 700.00 1.16 3.50 100.22 629.59 1.16 0.91 0.91 750.23 1.16 4.50 100.21 679.70 1.16 0.99 0.99 800.00 1.16 3.80 107.22 729.33 1.16 1.06 1.06 900.00 1.17 2.93 12.97 829.17 1.16 1.20 1.19 1,000.00 1.17 3.28 28.14 929.03 1.17 1.30 1.30 1,100.00 1.18 4.57 36.28 1,028.80 1.17 1.36 1.35 1,200.00 1.19 6.25 95.57 1,128.36 1.18 1.38 1.36 1,272.17 1.20 7.56 117.82 1,200.00 1.18 1.41 1.37 1,300.00 1.20 7.56 120.09 1,227.59 1.18 1.43 1.38 1,373.04 1.20 7.56 123.93 1,300.00 1.18 1.49 1.40 1,400.00 1.21 8.09 124.63 1,326.70 1.18 1.52 1.41 1,500.00 1.22 10.08 125.93 1,425.44 1.19 1.65 1.44 1,600.00 1.24 12.07 126.26 1,523.58 1.19 1.84 1.49 1,700.00 1.26 14.06 126.18 1,620.98 1.19 2.10 1.54 1,800.00 1.28 16.06 125.92 1,717.54 1.19 2.42 1.61 1,900.00 1.31 18.06 125.62 1,813.14 1.20 2.81 1.69 2,000.00 1.33 20.05 125.30 1,907.66 1.21 3.27 1.78 2,100.00 1.36 22.05 132.34 2,000.98 1.20 2.24 1.75 2,200.00 1.39 24.05 131.42 2,092.99 1.21 2.45 1.82 2,224.15 1.40 24.53 131.28 2,115.00 1.21 2.51 1.84 10-3/4"x 13-1/2" 2,244.15 1.41 24.53 131.09 2,133.19 1.19 2.55 1.84 2,300.00 1.44 26.20 129.43 2,183.66 1.19 2.68 1.83 2,400.00 1.49 29.20 126.75 2,272.19 1.19 3.07 1.82 2,500.00 1.54 32.19 124.95 2,358.17 1.20 3.65 1.84 2,600.00 1.60 35.19 123.82 2,441.36 1.21 4.38 1.88 2,700.001.66 38.19 123.09 2,521.54 1.25 5.25 1.94 2,800.00 1.73 41.18 122.58 2,598.49 1.31 6.23 2.04 2,900.00 1.79 44.18 122.20 2,671.99 1.39 7.32 2.17 3,000.00 1.86 47.18 121.90 2,741.85 1.50 8.50 2.31 3,100.00 1.94 50.18 121.66 2,807.87 1.65 9.75 2.49 3,200.00 2.02 53.18 121.45 2,869.87 1.82 11.08 2.68 3,300.00 2.11 56.17 121.28 2,927.69 2.02 12.46 2.89 3,400.00 2.21 59.17 121.12 2,981.16 2.24 13.90 3.11 3,500.00 2.31 62.17 120.97 3,030.13 2.49 15.38 3.34 3,600.00 2.43 65.17 120.84 3,074.48 2.76 16.90 3.58 3,630.07 2.47 66.07 120.81 3,086.89 2.84 17.37 3.65 3,700.00 2.47 66.07 120.73 3,115.26 3.05 18.45 3.87 3,800.00 2.28 66.07 122.42 3,155.82 1.97 8.48 2.49 3,900.00 2.29 66.07 122.26 3,196.38 2.11 9.04 2.64 4,000.00 2.29 66.07 122.11 3,236.94 2.26 9.60 2.79 4,100.00 2.30 66.07 121.99 3,277.50 2.40 10.17 2.95 4,200.00 2.31 66.07 121.88 3,318.06 2.55 10.74 3.10 5/3/2017 4:03:58PM Page 3 COMPASS 5000.1 Build 74 • • Errors Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 4,300.00 2.32 66.07 121.78 3,358.62 2.70 11.31 3.26 4,400.00 2.33 66.07 121.70 3,399.18 2.84 11.88 3.42 4,500.00 2.34 66.07 121.62 3,439.74 2.99 12.46 3.58 4,600.00 2.35 66.07 121.55 3,480.30 3.14 13.04 3.74 4,700.00 2.36 66.07 121.49 3,520.86 3.29 13.62 3.91 4,800.00 2.37 66.07 121.44 3,561.42 3.45 14.20 4.07 4,900.00 2.38 66.07 121.39 3,601.98 3.60 14.78 4.23 5,000.00 2.39 66.07 121.34 3,642.54 3.75 15.36 4.40 5,100.00 2.40 66.07 121.30 3,683.10 3.90 15.94 4.56 5,200.00 2.41 66.07 121.26 3,723.66 4.06 16.53 4.73 5,300.00 2.42 66.07 121.22 3,764.22 4.21 17.11 4.90 5,400.00 2.43 66.07 121.19 3,804.78 4.36 17.69 5.06 5,500.00 2.44 66.07 121.16 3,845.34 4.52 18.28 5.23 5,600.00 2.45 66.07 121.13 3,885.90 4.67 18.87 5.40 5,700.00 2.46 66.07 121.10 3,926.46 4.83 19.45 5.56 5,800.00 2.48 66.07 121.08 3,967.02 4.98 20.04 5.73 5,900.00 2.49 66.07 121.05 4,007.58 5.14 20.63 5.90 6,000.00 2.50 66.07 121.03 4,048.14 5.29 21.21 6.07 6,100.00 2.51 66.07 121.01 4,088.70 5.45 21.80 6.24 6,200.00 2.52 66.07 120.99 4,129.26 5.60 22.39 6.40 6,300.00 2.54 66.07 120.97 4,169.81 5.76 22.98 6.57 6,400.00 2.55 66.07 120.95 4,210.37 5.91 23.57 6.74 6,500.00 2.56 66.07 120.94 4,250.93 6.07 24.16 6.91 6,600.00 2.58 66.07 120.92 4,291.49 6.22 24.74 7.08 6,700.00 2.59 66.07 120.91 4,332.05 6.38 25.33 7.25 6,800.00 2.60 66.07 120.89 4,372.61 6.54 25.92 7.42 6,900.00 2.62 66.07 120.88 4,413.17 6.69 26.51 7.59 7,000.00 2.63 66.07 120.87 4,453.73 6.85 27.10 7.76 7,100.00 2.64 66.07 120.85 4,494.29 7.00 27.69 7.93 7,200.00 2.66 66.07 120.84 4,534.85 7.16 28.28 8.10 7,300.00 2.67 66.07 120.83 4,575.41 7.32 28.87 8.27 7,400.00 2.68 66.07 120.82 4,615.97 7.47 29.46 8.44 7,500.00 2.70 66.07 120.81 4,656.53 7.63 30.05 8.61 7,600.00 2.71 66.07 120.80 4,697.09 7.79 30.64 8.78 7,700.00 2.73 66.07 120.79 4,737.65 7.94 31.23 8.95 7,800.00 2.74 66.07 120.78 4,778.21 8.10 31.83 9.12 7,900.00 2.76 66.07 120.77 4,818.77 8.26 32.42 9.29 8,000.00 2.77 66.07 120.76 4,859.33 8.41 33.01 9.46 8,100.00 2.79 66.07 120.76 4,899.89 8.57 33.60 9.63 8,200.00 2.80 66.07 120.75 4,940.45 8.73 34.19 9.80 8,300.00 2.82 66.07 120.74 4,981.01 8.88 34.78 9.97 8,400.00 2.83 66.07 120.73 5,021.57 9.04 35.37 10.14 8,500.00 2.85 66.07 120.73 5,062.13 9.20 35.96 10.32 8,600.00 2.87 66.07 120.72 5,102.69 9.35 36.55 10.49 5/3/2017 4:03:58PM Page 4 COMPASS 5000.1 Build 74 0 • Errors Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 8,700.00 2.88 66.07 120.71 5,143.25 9.51 37.15 10.66 8,800.00 2.90 66.07 120.71 5,183.81 9.67 37.74 10.83 8,900.00 2.91 66.07 120.70 5,224.37 9.82 38.33 11.00 9,000.00 2.93 66.07 120.70 5,264.93 9.98 38.92 11.17 9,100.00 2.95 66.07 120.69 5,305.49 10.14 39.51 11.34 9,200.00 2.96 66.07 120.68 5,346.05 10.29 40.10 11.51 9,300.00 2.98 66.07 120.68 5,386.61 10.45 40.70 11.68 9,400.00 3.00 66.07 120.67 5,427.17 10.61 41.29 11.85 9,500.00 3.01 66.07 120.67 5,467.73 10.76 41.88 12.02 9,600.00 3.03 66.07 120.66 5,508.29 10.92 42.47 12.20 9,700.00 3.05 66.07 120.66 5,548.85 11.08 43.06 12.37 9,800.00 3.06 66.07 120.65 5,589.41 11.24 43.66 12.54 9,900.00 3.08 66.07 120.65 5,629.97 11.39 44.25 12.71 10,000.00 3.10 66.07 120.65 5,670.53 11.55 44.84 12.88 10,100.00 3.11 66.07 120.64 5,711.09 11.71 45.43 13.05 10,200.00 3.13 66.07 120.64 5,751.65 11.86 46.02 13.22 10,300.00 3.15 66.07 120.63 5,792.21 12.02 46.62 13.39 10,400.00 3.17 66.07 120.63 5,832.77 12.18 47.21 13.57 10,500.00 3.18 66.07 120.63 5,873.33 12.33 47.80 13.74 10,600.00 3.20 66.07 120.62 5,913.89 12.49 48.39 13.91 10,700.00 3.22 66.07 120.62 5,954.45 12.65 48.99 14.08 10,800.00 3.24 66.07 120.61 5,995.01 12.81 49.58 14.25 10,900.00 3.26 66.07 120.61 6,035.57 12.96 50.17 14.42 11,000.00 3.27 66.07 120.61 6,076.13 13.12 50.76 14.59 11,100.00 3.29 66.07 120.60 6,116.69 13.28 51.36 14.77 11,200.00 3.31 66.07 120.60 6,157.25 13.44 51.95 14.94 11,300.00 3.33 66.07 120.60 6,197.81 13.59 52.54 15.11 11,400.00 3.35 66.07 120.60 6,238.37 13.75 53.13 15.28 11,500.00 3.37 66.07 120.59 6,278.93 13.91 53.72 15.45 11,600.00 3.38 66.07 120.59 6,319.49 14.06 54.32 15.62 11,700.00 3.40 66.07 120.59 6,360.05 14.22 54.91 15.79 11,800.00 3.42 66.07 120.58 6,400.61 14.38 55.50 15.97 11,900.00 3.44 66.07 120.58 6,441.17 14.54 56.09 16.14 12,000.00 3.46 66.07 120.58 6,481.73 14.69 56.69 16.31 12,100.00 3.48 66.07 120.58 6,522.29 14.85 57.28 16.48 12,200.00 3.50 66.07 120.57 6,562.85 15.01 57.87 16.65 12,300.00 3.51 66.07 120.57 6,603.41 15.16 58.47 16.82 12,400.00 3.53 66.07 120.57 6,643.97 15.32 59.06 17.00 12,500.00 3.55 66.07 120.57 6,684.53 15.48 59.65 17.17 12,600.00 3.57 66.07 120.56 6,725.09 15.64 60.24 17.34 12,700.00 3.59 66.07 120.56 6,765.65 15.79 60.84 17.51 12,800.00 3.61 66.07 120.56 6,806.21 15.95 61.43 17.68 12,900.00 3.63 66.07 120.56 6,846.77 16.11 62.02 17.85 13,000.00 3.65 66.07 120.56 6,887.33 16.27 62.61 18.03 5/3/2017 4:03:58PM Page 5 COMPASS 5000.1 Build 74 • s Errors Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 i Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (0) (0) (usft) (usft) (usft) (usft) 13,100.00 3.67 66.07 120.55 6,927.89 16.42 63.21 18.20 13,200.00 3.69 66.07 120.55 6,968.45 16.58 63.80 18.37 13,300.00 3.71 66.07 120.55 7,009.01 16.74 64.39 18.54 13,400.00 3.73 66.07 120.55 7,049.57 16.90 64.99 18.71 13,467.24 3.74 66.07 120.55 7,076.84 17.00 65.38 18.83 13,500.00 3.85 66.45 120.55 7,090.03 17.05 65.57 18.82 13,600.00 5.51 67.66 120.56 7,129.01 17.21 65.96 18.87 13,700.00 8.11 68.93 120.59 7,166.00 17.37 66.17 18.99 13,800.00 11.00 70.24 120.65 7,200.90 17.53 66.20 19.14 13,900.00 14.00 71.59 120.72 7,233.60 17.69 66.08 19.30 14,000.00 17.04 72.99 120.80 7,264.02 17.85 65.79 19.46 14,100.00 20.08 74.43 120.89 7,292.07 18.02 65.36 19.59 14,200.00 23.10 75.90 121.00 7,317.69 18.18 64.78 19.69 14,300.00 26.09 77.39 121.12 7,340.79 18.35 64.05 19.74 14,400.00 29.03 78.92 121.24 7,361.31 18.52 63.20 19.76 14,500.00 31.91 80.47 121.38 7,379.21 18.69 62.21 19.74 14,600.00 34.73 82.03 121.52 7,394.42 18.86 61.10 19.69 14,700.82 37.49 83.63 121.66 7,407.00 19.03 59.86 19.63 14,800.00 37.49 83.63 121.84 7,418.00 19.20 60.26 19.80 14,900.00 37.49 83.63 122.05 7,429.10 19.38 60.74 19.97 14,926.15 37.49 83.63 122.10 7,432.00 19.42 60.86 20.02 14,926.47 37.49 83.63 122.10 7,432.04 19.42 60.86 20.02 15,000.00 37.49 83.63 122.26 7,440.19 19.55 61.23 20.14 15,100.00 37.49 83.63 122.46 7,451.29 19.72 61.72 20.31 15,200.00 37.50 83.63 122.67 7,462.38 19.89 62.21 20.49 15,300.00 37.50 83.63 122.87 7,473.47 20.06 62.69 20.66 15,400.00 37.50 83.63 123.08 7,484.57 20.24 63.18 20.83 15,500.00 37.50 83.63 123.28 7,495.66 20.41 63.68 21.00 15,600.00 37.50 83.63 123.48 7,506.75 20.58 64.17 21.17 15,700.00 37.50 83.63 123.68 7,517.85 20.75 64.66 21.34 15,714.49 37.51 83.63 123.71 7,519.45 20.78 64.74 21.37 15,809.06 36.05 86.00 123.84 7,528.00 20.84 66.23 21.17 7-5/8"X 9-7/8"by 10-1/2" 15,829.06 36.05 86.00 123.89 7,529.40 20.84 66.36 21.17 15,900.00 36.16 88.13 124.07 7,533.03 20.84 66.83 20.97 15,943.89 36.22 89.44 124.18 7,533.96 20.85 67.12 20.88 16,000.00 36.22 89.44 124.33 7,534.50 20.86 67.51 20.89 16,100.00 36.23 89.44 124.60 7,535.47 20.87 68.23 20.91 16,200.00 36.23 89.44 124.88 7,536.44 20.90 68.97 20.93 16,300.00 36.23 89.44 125.17 7,537.41 20.93 69.74 20.96 16,400.00 36.23 89.44 125.48 7,538.38 20.97 70.54 21.00 16,500.00 36.24 89.44 125.79 7,539.35 21.01 71.37 21.05 16,600.00 36.24 89.44 126.11 7,540.32 21.06 72.22 21.10 16,700.00 36.24 89.44 126.43 7,541.29 21.12 73.10 21.15 5/3/2017 4:03:58PM Page 6 COMPASS 5000.1 Build 74 • 0 Errors Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 16,800.00 36.24 89.44 126.76 7,542.25 21.18 74.00 21.22 16,900.00 36.25 89.44 127.10 7,543.22 21.25 74.93 21.28 17,000.00 36.25 89.44 127.44 7,544.19 21.33 75.87 21.36 17,100.00 36.25 89.44 127.78 7,545.16 21.41 76.84 21.44 17,200.00 36.25 89.44 128.13 7,546.13 21.49 77.83 21.53 17,300.00 36.26 89.44 128.48 7,547.10 21.59 78.84 21.62 17,400.00 36.26 89.44 125.12 7,548.07 21.04 69.53 21.08 17,500.00 36.26 89.44 125.22 7,549.04 21.07 69.78 21.10 17,600.00 36.27 89.44 125.32 7,550.01 21.10 70.04 21.13 17,700.00 36.27 89.44 125.42 7,550.98 21.13 70.30 21.16 17,800.00 36.27 89.44 125.53 7,551.95 21.16 70.57 21.19 17,900.00 36.27 89.44 125.63 7,552.92 21.19 70.84 21.22 18,000.00 36.28 89.44 125.74 7,553.88 21.22 71.11 21.25 18,100.00 36.28 89.44 125.85 7,554.85 21.26 71.39 21.29 18,200.00 36.28 89.44 125.96 7,555.82 21.29 71.67 21.32 18,300.00 36.28 89.44 126.07 7,556.79 21.33 71.95 21.36 18,400.00 36.29 89.44 126.18 7,557.76 21.37 72.24 21.40 18,500.00 36.29 89.44 126.30 7,558.73 21.41 72.53 21.44 18,600.00 36.29 89.44 126.41 7,559.70 21.45 72.83 21.48 18,700.00 36.30 89.44 126.52 7,560.67 21.49 73.13 21.53 18,800.00 36.30 89.44 126.64 7,561.64 21.54 73.43 21.57 18,900.00 36.30 89.44 126.76 7,562.61 21.58 73.73 21.62 19,000.00 36.31 89.44 126.88 7,563.58 21.63 74.04 21.66 19,100.00 36.31 89.44 126.99 7,564.55 21.68 74.35 21.71 19,200.00 36.31 89.44 127.11 7,565.51 21.73 74.67 21.76 19,300.00 36.31 89.44 127.23 7,566.48 21.78 74.99 21.81 19,400.00 36.32 89.44 127.36 7,567.45 21.83 75.31 21.87 19,500.00 36.32 89.44 127.48 7,568.42 21.89 75.63 21.92 19,600.00 36.32 89.44 127.60 7,569.39 21.94 75.96 21.98 19,700.00 36.33 89.44 127.72 7,570.36 22.00 76.29 22.03 19,800.00 36.33 89.44 127.85 7,571.33 22.06 76.62 22.09 19,900.00 36.33 89.44 127.97 7,572.30 22.12 76.96 22.15 20,000.00 36.34 89.44 128.09 7,573.27 22.18 77.29 22.21 20,100.00 36.34 89.44 128.22 7,574.24 22.24 77.64 22.27 20,200.00 36.34 89.44 128.34 7,575.21 22.30 77.98 22.34 20,300.00 36.35 89.44 128.47 7,576.18 22.37 78.33 22.40 20,400.00 36.35 89.44 128.60 7,577.14 22.43 78.68 22.47 20,500.00 36.35 89.44 128.72 7,578.11 22.50 79.03 22.53 20,600.00 36.36 89.44 128.85 7,579.08 22.57 79.38 22.60 20,700.00 36.36 89.44 128.98 7,580.05 22.64 79.74 22.67 20,800.00 36.36 89.44 129.10 7,581.02 22.71 80.10 22.74 20,900.00 36.37 89.44 129.23 7,581.99 22.78 80.47 22.81 21,000.00 36.37 89.44 129.36 7,582.96 22.85 80.83 22.89 21,100.00 36.37 89.44 129.48 7,583.93 22.93 81.20 22.96 5/3/2017 4:03:58PM Page 7 COMPASS 5000.1 Build 74 • . Errors Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (0) (0) (usft) (usft) (usft) (usft) 21,200.00 36.38 89.44 129.61 7,584.90 23.00 81.57 23.04 21,300.00 36.38 89.44 129.74 7,585.87 23.08 81.94 23.11 21,400.00 36.38 89.44 129.87 7,586.84 23.16 82.32 23.19 21,500.00 36.39 89.44 129.99 7,587.80 23.24 82.69 23.27 21,600.00 36.39 89.44 130.12 7,588.77 23.32 83.07 23.35 21,700.00 36.39 89.44 130.25 7,589.74 23.40 83.46 23.43 21,800.00 36.40 89.44 130.37 7,590.71 23.48 83.84 23.51 21,900.00 36.40 89.44 130.50 7,591.68 23.56 84.23 23.59 22,000.00 36.40 89.44 130.63 7,592.65 23.65 84.61 23.68 22,100.00 36.41 89.44 130.75 7,593.62 23.73 85.01 23.76 22,200.00 36.41 89.44 130.88 7,594.59 23.82 85.40 23.85 22,300.00 36.41 89.44 131.01 7,595.56 23.91 85.79 23.94 22,400.00 36.42 89.44 131.13 7,596.53 23.99 86.19 24.02 22,500.00 36.42 89.44 131.26 7,597.50 24.08 86.59 24.11 22,600.00 36.42 89.44 131.38 7,598.47 24.17 86.99 24.20 22,700.00 36.43 89.44 131.51 7,599.43 24.27 87.39 24.30 22,800.00 36.43 89.44 131.63 7,600.40 24.36 87.80 24.39 22,900.00 36.43 89.44 131.76 7,601.37 24.45 88.21 24.48 23,000.00 36.44 89.44 131.88 7,602.34 24.55 88.61 24.57 23,100.00 36.44 89.44 132.00 7,603.31 24.64 89.02 24.67 23,200.00 36.44 89.44 132.13 7,604.28 24.74 89.44 24.77 23,300.00 36.45 89.44 132.25 7,605.25 24.83 89.85 24.86 23,400.00 36.45 89.44 132.37 7,606.22 24.93 90.27 24.96 23,500.00 36.46 89.44 132.49 7,607.19 25.03 90.69 25.06 23,600.00 36.46 89.44 132.61 7,608.16 25.13 91.11 25.16 23,700.00 36.46 89.44 132.73 7,609.13 25.23 91.53 25.26 23,800.00 36.47 89.44 132.85 7,610.10 25.33 91.95 25.36 23,900.00 36.47 89.44 132.97 7,611.06 25.44 92.38 25.46 24,000.00 36.47 89.44 133.09 7,612.03 25.54 92.80 25.57 24,100.00 36.48 89.44 133.21 7,613.00 25.64 93.23 25.67 24,200.00 36.48 89.44 133.33 7,613.97 25.75 93.66 25.77 24,300.00 36.49 89.44 133.45 7,614.94 25.85 94.09 25.88 24,400.00 36.49 89.44 133.56 7,615.91 25.96 94.52 25.99 24,500.00 36.49 89.44 133.68 7,616.88 26.07 94.96 26.09 24,600.00 36.50 89.44 133.79 7,617.85 26.17 95.39 26.20 24,700.00 36.50 89.44 133.91 7,618.82 26.28 95.83 26.31 24,800.00 36.51 89.44 134.02 7,619.79 26.39 96.27 26.42 24,900.00 36.51 89.44 134.14 7,620.76 26.50 96.71 26.53 25,000.00 36.51 89.44 134.25 7,621.73 26.61 97.15 26.64 25,100.00 36.52 89.44 134.36 7,622.69 26.73 97.60 26.75 25,200.00 36.52 89.44 134.47 7,623.66 26.84 98.04 26.87 25,300.00 36.52 89.44 134.58 7,624.63 26.95 98.49 26.98 25,400.00 36.53 89.44 134.69 7,625.60 27.07 98.94 27.09 25,500.00 36.53 89.44 134.80 7,626.57 27.18 99.38 27.21 25,600.00 36.54 89.44 134.91 7,627.54 27.30 99.83 27.32 5/3/2017 4:03:58PM Page 8 COMPASS 5000.1 Build 74 . Errors Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 25,700.00 36.54 89.44 135.02 7,628.51 27.41 100.29 27.44 25,800.00 36.54 89.44 135.13 7,629.48 27.53 100.74 27.56 25,900.00 36.55 89.44 135.24 7,630.45 27.65 101.19 27.67 26,000.00 36.55 89.44 135.34 7,631.42 27.77 101.65 27.79 26,100.00 36.56 89.44 135.45 7,632.39 27.88 102.10 27.91 26,200.00 36.56 89.44 135.55 7,633.36 28.00 102.56 28.03 26,300.00 36.57 89.44 135.66 7,634.32 28.12 103.02 28.15 26,400.00 36.57 89.44 135.76 7,635.29 28.24 103.48 28.27 26,500.00 36.57 89.44 135.86 7,636.26 28.37 103.94 28.39 26,600.00 36.58 89.44 135.97 7,637.23 28.49 104.41 28.51 26,700.00 36.58 89.44 136.07 7,638.20 28.61 104.87 28.63 26,800.00 36.59 89.44 136.17 7,639.17 28.73 105.33 28.76 26,900.00 36.59 89.44 136.27 7,640.14 28.86 105.80 28.88 27,000.00 36.59 89.44 136.37 7,641.11 28.98 106.27 29.01 27,100.00 36.60 89.44 136.47 7,642.08 29.11 106.74 29.13 27,195.19 36.60 89.44 136.56 7,643.00 29.22 107.18 29.25 27,200.00 36.60 89.49 136.56 7,643.04 29.23 107.20 29.25 27,300.00 36.64 90.49 136.66 7,643.06 29.36 107.67 29.34 27,400.00 36.68 91.49 136.76 7,641.32 29.48 108.15 29.43 27,500.00 36.71 92.49 136.85 7,637.85 29.61 108.62 29.52 27,535.19 36.72 92.84 136.89 7,636.21 29.66 108.78 29.55 27,600.00 36.72 92.84 136.95 7,632.99 29.74 109.09 29.64 27,700.00 36.73 92.84 137.04 7,628.03 29.87 109.56 29.76 27,800.00 36.73 92.84 137.13 7,623.07 29.99 110.04 29.89 27,900.00 36.73 92.84 137.23 7,618.10 30.12 110.52 30.02 28,000.00 36.74 92.84 137.32 7,613.14 30.25 110.99 30.15 28,100.00 36.74 92.84 137.41 7,608.18 30.38 111.47 30.28 28,195.19 36.75 92.84 137.50 7,603.45 30.51 111.93 30.41 5/3/2017 4:03:58PM Page 9 COMPASS 5000.1 Build 74 • • Errors Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: > Rig:CD5-17 North Reference: True Wellbore: Rig:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp11 Database: OAKEDMP2 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name C) n' 115.30 115.30 20"x 42" 20 42 2,224.15 2,185.30 10-3/4"x 13-1/2" 10-3/4 13-1/2 15,809.06 7,598.30 7-5/8"X 9-7/8"by 10-1/2" 7-5/8 10-1/2 28,195.19 7,673.75 4-1/2"x 6-3/4" 4-1/2 6-3/4 Formations Measured Vertical Dip ;, Depth Depth Dip Direction ;---,;,..: ; < (usft) (usft) Name Lithology C) (1 2,375.58 2,321.10 C-30 0.00 5,802.43 4,038.30 K-2 10,371 97 5,891.70 Albian 96 14,790 95 7,487.30 Alpine C 13,894.95 7,302.30 LCU 14,817.99 7,490.30 UJU 15,809.06 7,598.30 Alpine A 14,926.15 7,502.30 CD5-17L1 TOW 5,966.14 4,104.70 K-2 Base 1,322.61 1,320.30 Base Permafrost 0.00 13,166.35 7,025.10 FCS Top 7,728.47 4,819.50 Albian 97 3,063.15 2,854.30 C-10 0.00 13,882.38 7,298.30 Kuparuk C 5,228.21 3,805.40 K-3 0.00 13,560.90 7,184.30 Kalubik Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 500.00 500.00 0.00 0.00 Start Build 1.50 600.01 600.00 1.29 0.23 Start Build 2.00 750.23 750.00 9.04 1.59 Start DLS 2.00 TFO 140.00 1,272.17 1,270.30 8.23 32.40 Start 100.88 hold at 1272.17 MD 1,373.04 1,370.30 0.12 42.90 Start DLS 2.00 TFO-7.82 2,224.15 2,185.30 -129.17 238.15 Start 20.00 hold at 2224.15 MD 2,244.15 2,203.49 -133.59 245.18 Start DLS 3.00 TFO-3.74 3,630.07 3,157.19 -620.01 1,076.93 Start 9837.17 hold at 3630.07 MD 13,467.24 7,147.14 -5,043.77 8,905.12 Start DLS 3.00 TFO 67.23 14,700.82 7,477.30 -5,899.29 9,697.98 Start 225.33 hold at 14700 82 MD 14,926.47 7,502.34 -6,099.85 9,798.33 Start 788.02 hold at 14926.47 MD 15,714.49 7,589.75 -6,800.21 10,148.79 Start DLS 3.00 TFO-33.46 15,809.06 7,598.30 -6,883.85 10,192.08 Start 20.00 hold at 15809.06 MD 15,829.06 7,599.70 -6,901.44 10,201.49 Start DLS 3.00 TFO 0.00 15,943.89 7,604.26 -7,002.59 10,255.62 Start 11251.30 hold at 15943.89 MD 27,195.19 7,713.30 -16,922.50 15,563.64 Start Build 1.00 27,535.19 7,706.51 -17,222.18 15,724.00 Start 660.00 hold at 27535.19 MD 28,195.19 7,673.75 -17,803.39 16,035.00 TD at 28195.19 Checked By: Approved By: Date: 5/3/2017 4:03:58PM Page 10 COMPASS 5000.1 Build 74 Pool Report 0 • CD5-17wp11 Surface Location n: CPA:Coordinate Converter From: — To: Datum: 1NAD83 _I Region: lalaska +I Datum: 1NAD27 �' Region: jalaska Latitude/Longitude Decimal Degrees _.:! C Latitude/Longitude 'Decimal Degrees '. 1"- UTM Zone:I r South C" UTM Zone: "True r South C*' State Plane Zone: F47-7,31 Units: us-ft 1 State Plane Zone: IY .1 Units: 17;71171, I"- Legal Description(NAD27 only) r Legal Description(NAD27 only) Starting Coordinates: —- Ending Coordinates: — --, X: 11489264.31 X: 1349231.159642637 Y: 15965575.11 Y: 15965829.15031473 Transform _I Quit j Help I 6. CD5-17wp11 Surface Location N CPA:Coo-dinate Converter .•' From: — I To: — Datum: NAD83 Region: Jalaska 1 Datum: NAD27 7j Region: lalaska C Latitude/Longitude 'Decimal Degrees I C" Latitude/Longitude 'Decimal Degrees _J UTM Zone: 1 E South C. UTM Zone: True r South t q State Plane Zone: Units: us ft C State Plane Zone: q Units: Jus-ft ,I C` Legal Description(NAD27 only) ( Legal Description(NAD27 only) Starting Coordinates: -- Legal Description-- — — X: 11489264.31 Township: ion N N.. Range: 1004E Y: 15965575.11 Meridian jU Section:118 __ IFNL J 1385.35159 FE—CI 12746.6855 i 1 Transform Quit I Help 1 • • CD5-17wp11 Surface Casing I CPA:.C_oo-dinate Converter = ir E3 '. From: --Ta Datum: -NAD 83 Region: Ialaska _-_----.1 Datum: INAD27 ..i Rogion: alaska (_- Latitude/Longitude 'Decimal Degrees C Latitude/Longitude Decimal Degrees . 1 ('" UTM Zone: I l— South C UTM Zone: True [a South is State Plane Zone: 14 Units: 1us-ft . 4— State Plane Zone: 14 Units: Jus-ft . C"` Legal Description(NAD27 only) C Legal Description(NAD27 only) r_.Starting Coordinates: Ending Coordinates: X: 11489499.80 X: 1 349466.647414236 1 1 Y: 15965441.18 Y: 1 5965695.2121584T- . Transform Quit Help 1 it _. N._ .n-ll-V___p--r—wry— CD5-17wp11 Surface Casing f CPA:Coordinate Converter E ,gym. � s, .r; . u From: — — __ , To: — Datum: 1NAD83 .1 Region: lalaska Datum: INAD27 Region: lalaska _. i :_- Latitude/Longitude 1Decimal Degrees C Latitude/Longitude 'Decimal Degrees . ,W_ UTM Zone: I la South C. UTM Zone: True r South t'+ State Plane Zone: 4 . Units: us ft . C State Plane Zone: 4 Units: us-ft . C Legal Description(NAD27 onlyj t+- Legal Description(NAD27 only) Starting Coordinates: r Legal Description _____X , : 11489499.80 Township: 1011 N .'; Range: 004 IE j Y: 15965441.18 Meridian: luSection:I18 1 FN L . 1514.56419 FEL . 12509.0425 Transform Quit 1 Help l • • C D5-17wp11 Kick-off Point fti CPr, ^_ ro-dinate Converter' ��. �* �^� From: _j —To: Datum: NAD63a_- . Region: alaska Datum: IqNAD27 .: Rogan: alaska . C" Latitude/Longitude 'Decimal Degrees . C Latitude/Longitude 'Decimal Degrees . C' UTM Zone: r South (_" UTM Zone: True I— South 4 State Plane Zone: 4 Units: 'us-ft . (: State Plane Zone: R--,,i. Units: jus-ft • C Legal Description(NAD27 only) C' Legal Description(NAD27 only) Starting Coordinates: —Ending Coordinates: : 11489264.31 X: 1 349231.159642637 Y: 15965575.11 Y: 1 5965829.15031473 Transform i Quit Help CD5-17wp11 Kick-off Point r X N CPA.:- C-oo-Uinate Converter e From: _ To:._ 1 Datum: NAD83 i Region: lalaska . Datum: `NAD27 Region: lalaska f__ Latitude/Longitude FDecimal Degrees .r1 C Latitude/Longitude [Decimal Degrees t UTM Zone: I Fa South C UTM Zone: ITrue E South r+- State Plane Zone: 14 ,I Units: 'us-ft .3 C State Plane Zone: 4 Units: jus-ft . C' Legal Description(NAD27 only) Legal Description(NAD27 only) ) -Starting Coordinates:"" - Legal Description 1469264.31 Township: 011 IN .I Range: r---- 1004 E . Y: 15965575.11 Meridian: 1U ,.I Section:11 8 FNL 1385.35159 FEL • 12746.6855 ` Transform 11 Quit I Help • • CD5-17wp11 Top of Production Ino CPA:Coordinate I Converter �: From: ; To: Datum: INAD63 .j Rcgion: Ialaska zi Datum: 1NAD27 . Rcgion: alaska . Latitude/Longitude Decimal Degrees —CI C.- Latitude/Longitude !Decimal Degrees zi UTM Zone: fl South C" UTM Zone: True f South _ Com' State Plane Zone: 4cl. Units: us ft . ;+ State Plane Zone: 4—� Units: us fk C- Legal Description(NAD27 only) C Legal Description(NAD27 only) Starting Coordinates: ___ _______-_.__._._...__ Ending Coordinates: X: 1499315.00_ X: 1359281.681633345 Y: 15958488.00 Y: 15958741.67028855 Transform Quit I Help 1 t - 1111- '1' - - i frill 11111111T I l l 111 W I.1 /11.1AI I __7_.. -r -i- CD5-17wp11 Top of Production CEJ CPA._ �..co-oinate Converter ' D X From: — To: Datum: Region: NAD 83 .I 9 lalaska ,. 1 Datum: NAD27 Region: alaska .i C. Latitude/Longitude [Decimal Degrees_ -- -1 `" Latitude/Longitude Decimal Degrees t" UTM Zone: South C UTM Zone: True fa- South 0' State Plane Zone: FE-Fa77A Units: 17-6—A. C State Plane Zone: 14 Units: us4t .! C Legal Description(NAD27 only) +t«- Legal Description(NAD27 only) —Starting Starting Coordinates: — Legal Description -- 1499315.00 Township: 011 1'".. J Range: 004 1-E ... Y: 15958488.00 Meridian: lu J Section:121 ___ FNL . 11997.0572 '..FEL `w. 13141.8712 Transform Quit I Help 4 .. I.I_L... 1.11...1 \ I " • i CD5-17wp11 Intermediate Casing I o n CPA Coordinate Converter , p`` u From: To: Datum: INAD83 H I Region: Alaska —CI Dokum: NAD27 Region: Alaska H •-- Latitude/Longitude ]Decimal Degrees _1 C Latitude/Longitude IDecimal Degrees i n UTM Zone: i— South C UTM Zone: True r South 1 li State Plane Zone: 4 T Units: Ius-it ., C* State Plane Zone: '4�—�IUnits: us-ft , 1 Legal Description(NAD27 only) ( Legal Description(NAD27 only) Starting Coordinates: ___________ ______.___ _ —Ending Coordinates: X: 11499315.00 X: 1 359281.681633345 Y: 15958488.00 Y: 15958741.67028855 Transform iiQuit I Help 1 i CD5-17wp11 Intermediate Casing I r C9 CPA:Coo.dinate Co�n�.erter'+ 1 I_ From: To: — -___-- Datum: �NAD83 Region: Ialaska _I Datum: 1NAD27 Region: Ialaska 2:1 C`" Latitude/Longitude Decimal Degrees , C Latitude/Longitude (Decimal Degrees IC UTM Zone: I —_ E South ( UTM Zone: True E South C; State Plane Zone: 14 Units: us-ft C State Plane Zone: 14 I Units: us-ft C Legal Description(NAD27 only) Cf- Legal Description(NAD27 only) Starting Coordinates: - — i Legal Description - -- I X: 11499315.00 Township: 1011 N Range: 1.5174— IE J Y: 15958488.00 Meridian: U Section:12i FN L 11997.0572 :FEL j 13141.8712 1 Transform Quit Help 0 • CD5-17wp11 TD 1,,,,=0-ffl t3 CPA:Coo-dinate Converter .."je..;;;;;;ele,;;;;;;;;;;;;;;WJr.4,,;iee,t• ••• .-..- ••.••••••••-- , •, ••; ;„e• .;.•.e.eee,L,,, ,e• From: To: Datum: 1NAD83 . Region: Ialaska ...7.1 Datum: 1NAD27 ..7.1 Region: lalaska • r LatitudelLongitude Decimal Degrees _II C Latitude/Longitude !Decimal Degrees 1 '1 C UTM Zone:1 Ell South C UTM Zone: True - r South ( State Plane Zone:14 -;; 1 Units: luot i a State Plane Zone: 147 : Units: 11.7 C Legal Description(NAD27 only) I r Legal Description(NAD27 only) -Starting Coordinates: Ending Coordinates: ; X: 11504936.49 _ X: 1 364902.667351545 ; ......... Y: 1---9-474-5-9187 Yl [5947707.20961148 i 1.,•' ,. Transform Quit I Help 1 4l." li CD5-17wp1 1 TD 11fIt CPA:Coordinate Cce•nver:er ; ...........- From: -To: 0 atUM: INAD83 . Region: lalaska1 Datum: INAD27 zRegion: __•. j lalaska ...7.3 C Latitude/Longitude 'Decimal Degrees zi C Latitude/Longitude !Decimal Degrees _ C UTM Zone:r - r South C UTM Zone:!True F South 4" State Plane Zone:14 - , Units:Jus-ft zi C State Plane Zone:14 ,T Units: luot ... .'.! C Legal Description(NAD27 only) C4' Legal Description(NAD27 only) Starting Coordinates: Legal Description X: 11504936.49 Township: loll F;a1 Range: 1004 rE--... .. Y: 15947453.87 Meridiem lu ., Section:134 1 IFNLm•-• 12367.4887 I [ 1 12622.4513 ' el -;..; Transform 1 Quit I Help 1 4 - ....................-0, 0 • 11:15, May 03 2017 C D 5-17w p 11Name WELLBORE TARGET DETAILS(MAP CO-ORDINATES) TVD Shape 005-1700.L1TOW 011117 DK 7502.30 Cade(Radius:100.00) Quarter Mile View 005-il 1.Hee1 1117 IX )598.30 Cade Madam 1320.00) CD5-1]02.7 0111111 DK 7513.30 Cede(Ratlius:1320.00) ''i G' GI i' 13000--- God I .5.0" C j S 6500 + — ,,o – `n ,(.0 \A .. loviii o ane' P .. • 0 � --6500- .. `'' U •9- 0 CD5-315P81 Gpy'S 1 13000-............... �. . — — c0`�413 G` • y.9 P 0c� -_ 19500 Go ,1�Q. I I -13000 -6500 0 6500 13000 19500 26000 32500 39000 West(-)/East(+) (6500 usft/in) 0 • CD5-17wp11 3-D View 1 Rg.CD5-17,Rig.CDS 17,Pg:0051 • • ....._ ......................__...- CD5-08.CD5-08.CDS... • • CD520 CDS20L1,CD520L CD506L1,CDS06L \/ ',, ., CD5-05,CD5-05,CD5-0' ................."'--""--"-'.......................-.-.-.........---._-.-. CD5-2 ... 0,CD5-20,CD5-25-06,CD5-06,CD5-0: I CD3 CD5-99,CDS99AL7,C05-99AL CD5-11,CD5-11,CD5-1 CD5-99,CD5-99,CD5-•• ......----""-""""---------.-.- C / 1 . 005313,CD5-313PB1,C05-313PB :/ • • ...........-.-. 004321,CD4-321,CD432 • CD5-313,CD5 313,CD5-31 -'--- -- .- ' Prelim:CD5-92,Prelim:CD5-92,C05-920903(120)W9 COO-900905(11 C)WiP05 23v.504(10B• li: CD5-18,CD5-18L1,CD5-18L • CD5-99,CD5-99A,CD5-99• • -----------------------------Plan:CD5-19,Plan:CD5-19L7,CD5-19L1wp08(81 • Plan:C05-19,Plan:C05-19,CD5-190908(8�: ----""-'' -_-___Rig:CDS17,Rig:CD5-17,CDS77wpl ( CD5-18,CD5-18,CD5-1: • CD5-17wp11 3-D View CD5-05,CD5-05,CD5.0- CD5-08,CD5-08, CD5-11,CD5-11,CD5-1 CD4-322,CD4-322,CCD5-99,CD5-99AL1,CD5-99AL CD5-99,CD5-99,CD5-•• • • CD5-17wp11 3-D View CD5-18,CD5-18L1,CD5-181 • • ' Plan:CD5-19,Plan:CD5-19L7,CD5-19L1wp08(e� Plan:CD5-19,Plan:CD5-19,CD5.19wp08(8� / \ GD5-99,CD5-99A,CD5-99• CD5-18,CD5.18,CD5-1: Rig:CD5-17,Rig:CD5-17,CD5.17wp1 • Tollerable Collision Risk Worksheet ! 0 Conoc PhillipsCon coo i llips Alaska,Inc Drilling Anti-Collision Management Alaska A Tolerable Collision . Collision of CD5-17L1 with CD5-17 Risk Worksheet 5 i ..IIR 11Z-�W a a., aWiir M , �-Xr ilti._„ :r '---7- _ based on Rev.1-29 Jul 99 Well CD5-17L1 fails anti-colision with our lower lateral CD5-17. There Is no immediate danger to life or impact to the environment if well CD5-17 11 Intersects CD5-17 as this well was just drilled Use this sheet to describe a well interference scenario where QRA and we know our mud weights with ECD are sufficient and will have MPD available. There Is a may be applicable.Check first that the scenario really is different cost impact if we hit the CD5-17 wellbore as if we hit our lower lateral the well may have to be from those described on existing worksheets. redrllled. ; When we window out of the mother bore we will be trying to steer up with a 1.5deg motor a .-eco "" Kurt Alexa 7'4. , assembly and to the left to gel away from the wellbore as quickly as possible. •-Avi nio#.,H::)'A Johnson Njok &me_ Ile r / Do the consequences Are the SF0 p 'Q10 of collision include a Org Oto risk to personnel or the consequences of collision environment? .. Major risk {{� g-',dt'i,-3LS95f3C b i iii '' J'' .. ?.f' . :...'''K,a ON0 V geiVIA it_VI:giltA °ilii.._If'4$ir °s 5aLAR2, No HSE risks exist with C05-17L1 intersecting CD5-17. The only economic risk if we hit the exsislirrg wellbore Is that we may loose the lower lateral and $30,000,000 the well may have to be redrilledb This risk is minimized as we will be drilling the L1 lateral with periscope and we will know If we are drilling out of zone towards our lower lateral.•.-/ M 0 1;OK r Off6 Mgt" � lik. q5L— VV" Al IAL, C. WileV1- (. a t e. tesi..‘"it uw"02 y't vi(_ redti.. cad. ;t I 9go+J - ° i -tri i'k`� E7 'tier Ir�.3t ;! n C= $30,000,000 _ '. '1!.', -021-'1��°1ingi r.S itiB ',hRR7f 1 i' b foi9lt?Jreti.-_.;..�..., ., Is there a practical way u= t t -, to substantially reduce Org either the probability of tom° ' ' " 1A' collision or the severity V= $33,000,000 of the consequences? NAG trig"sE r-4Z,--U1112 aldol 71 Fiisj r.W,EAw� •ri i+ 'tri, f rviLi ,ii iiitiViii a . : o a. AW-0..1r if 3¢1x .is iii lr • .,.- - r + F= 0.01 t irlJtll4' aT 1k+1'iii_c V= $0 V F/C= 0.011 v ;-1 it.:; . i-c4Z. 1i rifo- °11Ig'a ter'zigz.ii }.iIT.:0~' la 1ita t if VF > 1 then close approach tolerances need not be set V 1i",,3 II,1 44t teat_=,1-q n illy-iuTi firtLfq Iaf fdi C If VF g9 of M.4 MP it4i7M i Pili P l 1ivr11 r ;a g C < 1 then Tolerable Collision Risk=1 in C/V F M= 20 F=1/M= 0.05 ' Tolerable Collision Risk= 1 in 91 i • Conoc Phil lipsConocoPhillips Alaska, Inc Drilling Anti-Collision Management Alaska Tolerable Collision (r-gr Li-; ... f 4/. -.- _ Collision or CD5-i 7 WP09 with CD4-321 �� w � - Risk Worksheet :4,aa e�F { u Cu_s4iTla m` ;r itf.e.1 .. Ji`h^u.,".-°i'u r-: I[R1"s^'i�3 based on Rev.1-29 Jul 99 Well CD5-17 fails anti-collision with the Injector CD4-321. There is no immediate danger to life or impact lo the environment as we can use geological cenatnly to to pass our anti-collision. When Use this sheet to describe a well interference scenario where QRA we are driling CD5-17 and anti-collision starts failing with CD4-321 we wil be In the Alpine A sand may be applicable.Check first that the scenario really is different drilling ahead(CD4-321 is above us geologically). By the time CD4-321 penetrates the Alpine A from those described on existing worksheets. sand the arid-collision Is no longer failing. We win ensure that we are drilling in the Alpine A sand using periscope to avoid the anti-collision risk and lake checkshot surveys beginning 500'ahead of `_ d "rli 1$� Kuri Alexa nearest collision point. Our anti-collision is failing with CD4-321 from 21505-21525(CD5-17),CD4- 321 penetrates the Alpine A at 1911aa.. 6'MD. CO4-321 will be shut in as we dril towards the near approach point. Anil-collision will have to be re run Nwe are right of the Hoe while drilling ahead. 6z rajei- bl Njoku the consequences0-7-'s— Do'�'"0 of collision include a eras Are the �risk to personnel or theconsequences environment? of collision fires 49410 DI elf=VIVA_s`. - _.egii .E # tC'a'ry-r.m.. z_ 22100Ort No HSE risks exist with CD5-17 intersecting CD4-321 as we can use geological certainty to pass our anti-cotision $15,000,000 eea a a � � 1 e �trri b . :say r _.•' . C— $15,000,000 a it1ill 4 � } a i s L.,„.„_.,,,,,,.11 . ?e �� . f gypp� Is there a practical way �, �� to substantially reduce o 9$ 't ..- �t p' either the probability of a �i .ilii. . w collision or the severity V= $33,000,000 of the consequences? 7 TZll l ll Aptii ilr:1;LuaaiAaiiireti-ht dei i' i j F= 0.01 14.A`r;tkriil i dA.111 V= $0 ,. ..[>y = .. .. —. ._ VF/C= 0.022 i�C fifth}a i0ale i1 it , if -r 1 r3 r If V F > 1 then close approach tolerances need not be set riffat'FAAJ. ift.T !o r J i II iIr'a a`3 'LI II V F rOliti4saY.pi. au �a ll . . i....,__11 __ ®a C < I then Tolerable Colision Risk=i In C!V F M= 20 F=1/M= 0.05 . Tolerable Collision Risk= 1 in 45 • • Conor Ph i lli psConocoPhillips Alaska,Inc Drilling Anti-Collision Management Alaska A Tolerable Collision Collision of CD5-17L1 WP09 with CD4-321 Risk Worksheet vY �� °l+ale<Sli .+I�.i_:_ -— based on Rev.1-29 Jul 99 Wet CD5-17L1 falls anti-collision with the injector CD4-321. There is no immediate danger to life or impact to the environment as we shifted the wellplan to the east so we can use geological Use this sheet to describe a well interference scenario where ORA certainty to pass our anti-collision. When we are drilling CD5-17L1 and anti-collislon starts failing may be applicable.Check first that the scenario really Is different with CD4-321 we will be ki the Alpine C sand drilling ahead(CD4-321 is above us geologically). By from those described on extsling worksheets. the time CD4-321 penetrates the Alpine C sand the anti-collision Is no longer falling. We will ensure That we are drilling in the Alpine C sand using periscope to avoid the anti-collision risk. Our Kurt Alexa anti-collision Is failing with CD4-321 from 21584-21615(CD5-17 depths),CD4-321 penetrates the Alpine C at 16933'MD.CD4-321 will be shut in as we drill towards the near approach.Anti .hnson Maim collision will have to be re run if we are right of the line whitedr$ling ahead. • Do the consequences p � ag 0 of collision include a ' Are the OVOS 0 risk to personnel or the consequences environment? of collision Major risk • • No HSE risks exist with CD5-17L1 intersecting CD4-321 as we can use geological certainty to pass our anti-collision $15,000,000 .-e, .Blit'+ c `P15,o00,000 It4131ri»�i tai+iSl [TkWz As we approach the position in the lateral $370,000 close to CD4-321 (500f from near approach),shorter course lengths 30- will be used to confirm Is there a practical way 50ft surveys 3 +rl iT3C='fir off position of CD5-17L1 lateral and make prey to substantially reduce CPI0 probability the e appropriate steering corrections If eP Y of needed. This risk reduction will cost collision or the severity V= $33,000,000 additional rig time associated with the of the consequences? additional surveys. Once past the near appoach,survey will continue as normal.(90-100ft). In the event that the corrections are not sufficient,a trip for a motor will need to be made to steer accordingly 9 iW[r ,4,14:' �•'lyq, dItf * po-rei4i 7dir VJ J fls rtf ^�a t tt7e� 1 `r T F= 0.01 - V= $370,000 • V F/C= 0.001233333 PP If V F > 1 then close approach tolerances need not be set erCt3 ll E +9 11brri f + 46TIS 01 If VF C < 1 then Tolerable Collision Risk=1 m C I V F M= 20 F=1/M= 0.05 Tolerable Collision Risk= 1 in 811 As - built REV DATE BY CK APP • DESCRIPTION REV DATE BY APP DESCRIPTION 1 4/24/15 CZ DB C.A. UPDATED PER K150003ACS 2 5/2/16 CZ GD C.A. UPDATED PER K160003ACS ALPINE SATELLITE DEVELOPMENT E--- , ___rt . LOCATION OF ��} h� j: THIS SURVEY T12IO C/ ` b CPAD T11 N , ,�- �" CD4 TO ALPINE ( D2 �e CD5 * ` ACCESS ROAD G ffr t.� CD5111../..""h" f '‘ '6111% 41111."1"4111 Iti -4 O '` z irk PR•, a iiiw =a p pro IpLL lirs "4, col QIP mini 111M- MEW 1 VICINITY MAP NOT TO SCALE LEGEND: O PROPOSED CONDUCTOR • EXISTING CONDUCTOR SECTION 7, T. 11 N., R. 4 E., U.M. SECTION 18, T. 11 N., R. 4 E., U.M. CD-5 QPP° �� R o, oPAD NSNOa ,013, �OES, sQo 002,,,,s,,,,, , \ ;‘, 00,0 . . 3.0 O�O`%X NN�N��•�;•• •• 401' t,i . O, e eN - PLANT N N 0 NOTE: 15'40 52" p01 CONDUCTOR CD5-x14 WAS PLUGGED AND _ r p ABANDONED APRIL 2016. Z y KUUKPIK . I UMIAQ ALPINE SURVEY OFFICE PHONE:907-670-4739 `,V ALPINE MODULE:CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD-5 WELL CONDUCTORS Alaska, Inc. AS-BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 15-03-02-1 04/18/2015 CE-CD50-1025 I 1 OF 3 1 2 REV DATE BY CK APP • DESCRIPTION REV DATE BY r APP DESCRIPTION 1 4/24/15 CZ DB C.A. UPDATED PER K150003ACS 2 5/2/16 CZ GD C.A. UPDATED PER K160003ACS ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC. 18, T 11 N, R 4 E, U.M. SEC.LINE 0/S EXIST. WELL 'Y' 'X' LAT.(N) LONG.(W) FNL FWL GND PAD CD5-x99 5,965,666.90 1,489,591.67 70' 18' 49.211" 151' 3' 20.820" 287' 2508' 27.5 33.9 CD5-x01 5,965,661.64 1,489,572.44 70' 18' 49.155" 151' 3' 21.378" 293' 2489' 27.6 34.1 CD5-x02 5,965,656.28 1,489,553.29 70' 18' 49.099" 151' 3' 21.934" 299' 2470' 28.1 34.1 CD5-x03 5,965,650.92 1,489,534.00 70' 18' 49.042" 151' 3' 22.493" 305' 2451' 28.4 34.1 CD5-x04 5,965,645.24 1,489,514.77 70' 18' 48.982" 151' 3' 23.051" 311' 2432' 26.6 34.2 CD5-x05 5,965,639.80 1,489,495.46 70' 18' 48.925" 151' 3' 23.611" 316' 2412' 28.1 34.3 CD5-x06 5,965,634.56 1,489,476.20 70' 18' 48.870" 151' 3' 24.170" 322' 2393' 27.7 34.3 CD5-x07 5,965,629.08 1,489,457.08 70' 18' 48.812" 151' 3' 24.724" 328' 2374' 27.9 34.3 CD5-x08 5,965,623.88 1,489,437.69 70' 18' 48.757" 151' 3' 25.287" 334' 2355' 28.1 34.3 CD5-x09 5,965,618.27 1,489,418.53 70' 18' 48.698" 151' 3' 25.842" 340' 2336' 27.3 34.2 CD5-x10 5,965,613.12 1,489,399.13 70' 18' 48.644" 151' 3' 26.405" 345' 2317' 28.1 34.1 CD5-x11 5,965,607.66 1,489,379.86 70' 18' 48.586" 151' 3' 26.964" 351' 2297' 27.9 34.1 CD5-x12 5,965,602.23 1,489,360.56 70' 18' 48.529" 151' 3' 27.524" 357' 2278' 28.0 34.1 CD5-x13 5,965,596.59 1,489,341.43 70' 18' 48.470" 151' 3' 28.079" 363' 2259' 26.1 34.2 CD5 x14 1,489,322.33 70' 18' 48.414" 151' 3' 28.633" 368' 2240' 27.6 34.2 CD5-14X 5,965,589.94 1,489,317.35 70' 18' 48.400" 151' 3' 28.777" 370' 2235' 27.5 33.8 CD5-x15 5,965,586.10 1,489,303.11 70' 18' 48.359" 151' 3' 29.190" 373' 2221' 26.8 34.2 CD5-x16 5,965,580.48 1,489,283.58 70' 18' 48.300" 151' 3' 29.757" 380' 2202' 27.6 34.0 CD5-x17 5,965,575.11 1,489,264.31 70° 18' 48.243" 151' 3' 30.316" 386' 2183' 27.7 34.0 CD5-x18 5,965,569.79 1,489,245.23 70' 18' 48.187" 151' 3' 30.869" 391' 2164' 27.7 33.9 CD5-x19 5,965,564.42 1,489,225.90 70' 18' 48.131" 151' 3' 31.430" 397' 2144' 28.0 33.9 CD5-x20 5,965,558.96 1,489,206.70 70' 18' 48.073" 151' 3' 31.987" 403' 2125' 25.8 33.8 CD5-x21 5,965,553.51 1,489,187.22 70' 18' 48.016" 151' 3' 32.552" 409' 2106' 27.8 33.8 CD5-x22 5,965,548.14 1,489,168.15 70' 18' 47.959" 151' 3' 33.105" 415' 2087' 27.7 33.7 CD5-x23 5,965,542.72 1,489,148.81 70° 18' 47.902" 151' 3' 33.666" 420' 2068' 26.4 33.7 CD5-x24 5,965,537.42 1,489,129.64 70' 18' 47.846" 151' 3' 34.222" 426' 2049' 28.0 33.7 CD5-x25 5,965,532.01 1,489,110.28 70' 18' 47.789" 151' 3' 34.783" 432' 2029' 27.7 33.7 CD5-x26 5,965,526.59 1,489,091.09 70' 18' 47.732" 151' 3' 35.340" 438' 2010' 26.3 33.7 CD5-x27 5,965,521.20 1,489,071.88 70' 18' 47.675" 151' 3' 35.897" 444' 1991' 27.5 33.7 CD5-x28 5,965,515.81 1,489,052.48 70' 18' 47.618" 151' 3' 36.460" 449' 1972' 27.4 33.6 CD5-x29 5,965,510.40 1,489,033.34 70' 18' 47.561" 151' 3' 37.015" 455' 1953' 27.6 33.6 CD5-x30 5,965,504.97 1,489,014.02 70' 18' 47.504" 151' 3' 37.575" 461' 1934' 1 25.3 33.6 CD5-x31 5,965,499.57 1,489,994.73 70' 18' 47.447" 151' 3' 38.135" 467' 1915' 26.6 33.6 CD5-x32 5,965,494.13 1,488,975.45 70' 18' 47.390" 151' 3' 38.694" 473' 1895' 26.8 33.6 CD5-x33 5,965,488.75 1,488,956.35 70' 18' 47.333" 151' 3' 39.248" 478' 1876' 27.0 33.6 NOTES 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 83. 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL KU77��UKPIK (B.P.M.S.L.) U JYl I A. Q 3. CONDUCTOR CD5-x14 WAS PLUGGED AND ABANDONED APRIL, 2016. ALPINE SURVEY OFFICE PHONE:907-670-4739 ALPINE MODULE:CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD-5 WELL CONDUCTORS Alaska, Inc. AS-BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 15-03-02-1 04/18/2015 CE-CD50-1025 1 OF 3 2 • S TRANSMITTAL LETTER CHECKLIST • WELL NAME: - ' PTD: a i-T -01 ?- Development /Service Exploratory Stratigraphic Test _Non-Conventional FIELD: al/d/L ?s.\f&r d .i— POOL: CA /k. I�✓ ��I 1' Jt� ��nE �� Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - . (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10'sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a)authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are also required for this well: Well Logging Requirements / Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion,suspension or abandonment of this well. Revised 2/2015 • 0 El il N , , a a; ; a), L° ° 0) E 0 0. a 0, : . a o L C a Q, , M. co, E. o, V G >, O) O' O, a E 0 : a O. 2 o'. „ , a) o ate). Z j o >,r a u , . . =. r Er) w o. v, 3. a C,, '� i---: 0. _ •c 0 . 8 w o : a) °o E. N 2. of E 3. o E rn ; 0 05 o ' :Cl - ' ' al. �, a o . a) 2'0. '0, 3 o w' U d O O. W CO CO' �, M, N' pj� C� Q. 4 O� H a. c' .(y a) E. L. -O' O: Q o) 0 N, O G n z o v, °; N a : c'. , CO U. U¢' a a, N , 0) Q a a)) N. _� .0 b' c,) E o' , a , o. Q, O, O' , M. N a �. O ' ' m; m. v' �' v as.w0' ' 0, N' 0, Uo C J 0 z. a ' —, . 0 w, CO 0. d N m. o, �, , o,� ° oN' y3 � ! HI !a) fp. U, o , o CY L' 3' �. U (6 a) as N� N N N. 0 C7 , d, 0: ,� m' m 0, ; U 0. a -o; x -' N'. N' 3'. €: N. 0, O, a1°i. y. . �, n z ' z. U �'. ,r'. o. , ca, U. �'. o, 0. d g; ° , Ti �. 0 E' 0, E. �. _ . 0 m O ' LL' v' O 0 O ; �, Q. 0 ' m u)'- . a.2. m Q 5. g. 2, _; 0 M.. W. r. 0 a '°--- , , , , w or Q Ni8NN, N, N, Na, 8 0 ) aia) <, yCl)ma) 0; 0 'C m < aa ): N (aNiml, NN0SQ < < Cz - - >- - z >', }, >- Zz >- >- z >- >- -, >- - -, >- >- >- z •, zzZ ,... . ,. a E: 3. _ , at, N o U 'N LL O. o. o # c , a). x U o, a), E, 3. a 0 3 O .CO' : w 0' O 0. N U N V a) V J Q •C h v'p, N �'. IC; 7 . • • c.) '� , . . vpN't, 0, 9 0 a >. E. , N W O 3, • N, �• V' y N Oy � N 0NN COp � N OD f : N L' o . c34 O cL . c '' • ' CO' Q' ' N, or' 0co ' ' ca) ti) ° ( 4, yNit 1 2 U c ' ° ' . a) . ' wZ •0 0 c •°' O ) E. a D UC. CD' m 'O O a) 0. N 11' -c CC' 0. - a '� co • 0. >. ' ' y > O. 4 0. - ce CO, wa0: OOa °)C J - EE = a. C, cE 0, N. O M , C c, co,, V 1- wn cOe.5 C N OD . N L. •C O . 4- Cp � 0Q3N. C 'C . W - - H O _ O ° ONT, nO0'' • p 'O U. 0, `, Y N' Y N.Nwp, 'DfO ,e O O O yO+ OOO0N o \ �: ac0 ' - C ° % 0, o 3. 0c -,. CD . , CO, . C, �, ; . a), o o E ' Q a C, •p, a; a. ca. O, a .8° _ _ >' 07 0; v, `E, pN. - a : a. M. pN. V. 0, a 'aar N' ' ' 3` �a) 6' NO w CO NN : U .oa ° c ° 0 ° vC' ' � , . o -a41 oL - O 2c ' O. °O. >. ,- 0, a V,, O. O' 0, E' pcc, O, 0. 0 0 c. CO' ON' ° ' NO0O ON' aw' T C a ad0a D0GEE 0 7. O' C d' N a0' N0Y .° 0 , y .{s N' E' Ni.; a C o C o oJNLa E "0' a a O Na O. y cna •L' .. .. =L@ cco o 3 , ° Nd 0' aCO' OOcpc) _ ,- G co O) a a) a) a) m0pN; O2. C' 0 O. p @ ` T T c. Y co -0 '� O' 0NO co - � a f6 0,, . .C a a 0. : c, , a0(a3C, ° rn c Nv >: Cc ayE, : ° .a ' '. ' 0 E LLOl. L' c ' '°. '°. U. NC' 2 _a - �, r, U N' N O .a? W t: c: 'a co c0 0 acm . U Cl) mCl), a;, a. u �. p. Lc, c c " . '3' C o V' 'O. °. N _ 0 ° m m, o o 0 c. opoc O ' ° m. a CD 0 as7o C cco ci . � co o' c ' ' ' ' .s co ' cotewa § c `' yo , 0V/ 0a) 7' ° ° ° ' ' m ” a ° m. z " > > c = 6. = a) 2 w 0 mt '- a E m 21. c) . TI) g' a4ya0' ° ' c o ` ; _ Cl) c � o; 00 ' .0 .71)' m ' -o ; . c; ' . �; � 22' a , V _' OO ° a '03 co a .J2 �; �', �', CA, = ooa a' U ', ¢: a; zU; cn , 000, UQ - a, � m mU ; o; , : _' Mr)_ 0 (,), (00r)_ 0 (,), (00W a O — N M u) co r co co O r- N CO C U) CO N. CO 0) O N CO Lo CO t- CO O) I o E 4- N M � (C) CO B co O � r- N N N N N N N N N N COM M M M M CO M CO M V °U f`bi. N N p 0 0 w O O 0 �'.,. o O a V O a m 0 V_ o _N W o w to E � 0 E J N E d O 0 J 1.- a m c a J o a m 0 O) a 1- 0 0. Y s. Q Q a w a ' t7 Q a • • 2/7-0 /4 Loepp, Victoria T (DOA) From: Alexa, Kurt J <Kurt.J.Alexa@conocophillips.com> Sent: Monday,April 10, 2017 10:16 AM To: Loepp,Victoria T(DOA) Subject CD5-17 Change in Spud Date Follow Up Flag: Follow up Flag Status: Flagged Victoria, Just wanted to give you a heads up that the CD5-17 well (Dual Lateral Injector with permits,#217-017 and#217-018)will be moving up in our schedule and will have an anticipated spud date of April 20,2017. There are no changes to the well design. Is there anything that you require from our end for this change? This well will move ahead of the CD5-314X well. Please let me know if there are any issues or concerns. Kurt Alexa Staff Drilling Engineer ConocoPhillips Alaska (907) 263-4933 ( Office ) (907) 787-9637 ( Cell ) 1 OF ? • �eA THE STATE Alaska Oil and Gas OfALASKA Sr�t Conservation Commission �„ � 333 West Seventh Avenue 1. GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 OFA S�� Fax: 907.276.7542 www.aogcc.alaska.gov Chip Alvord Drilling Manager ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Re: Colville River Field, Alpine Oil Pool, CRU CD5-17 ConocoPhillips Alaska, Inc. Permit to Drill Number: 217-017 Surface Location: 385' FNL, 2747' FEL, SEC. 18, Ti 1N, R4E,UM Bottomhole Location: 1486' FNL, 3090' FEL, SEC. 34, T11N, R4E, UM Dear Mr. Alvord: Enclosed is the approved application for permit to drill the above referenced service well. Per Statute AS 31.05.030(d)(2)(B)and Regulation 20 AAC 25.071,composite curves for well logs run must be submitted to the AOGCC within 90 days after completion,suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition,the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05,Title 20,Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy . Foerster Chair DATED this day of March, 2017. STATE OF ALASKA FEB 0 9 2011 ALA OIL AND GAS CONSERVATION COMIIIJN PERMIT TO DRILL ` ' 20 AAC 25.005 la.Type of Work: lb.Proposed Well Class: Exploratory-Gas ❑ Service- WAG E '. Service-Disp ❑40l�lc.Specify if well is proposed for: Drill D. Lateral ❑ Stratigraphic Test ❑ Development-Oil ❑ Service- Winj ❑ Single Zone [l Coalbed Gas Li Gas Hydrates ❑ Redrill❑ Reentry❑ Exploratory-Oil ❑ Development-Gas ❑ Service-Supply ❑ Multiple Zone [ _Geothermal ❑ Shale Gas ❑ 2.Operator Name: 5. Bond: Blanket ❑ . Single Well ❑ 11.Well Name and Number: ConocoPhillips Alaska, Inc. Bond No. 59-52-180 ' CRU CD5-17 ' 3.Address: 6.Proposed Depth: 12.Field/Pool(s): P.O.Box 100360 Anchorage,AK 99510-0360 MD: 27195 TVD: • 7713 Colville River Unit • 4a. Location of Well(Governmental Section): 7.Property Designation(Lease Number): Alpine Pool ' Surface: 385'FNL,2747' FEL,Sec.18,T11N,R4E,UM ` ASRC-NPR4,ADL387208,ASRC-NPR2,ADL387209 Top of Productive Horizon: 8.Land Use Permit: 13.Approxim a Spud Da e: vrt._ 1997'FNL,3142'FEL,Sec.21,T11N,R4E,UM 932669,932193,932128,932195 4/1/ 17 71/// I7 Total Depth: 9.Acres in Property: 14.Dist ce to Nearest roperty: 1486'FNL,3090'FEL,Sec.34,T11N,R4E,UM ,, 5032.03,1145.67,8838.21,639.93 3090'from ADL388905 4b.Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL(ft): 70.3 .• 15.Distance to Nearest Well Open Surface:x- 349231 y- 5965829 Zone-4 -, GL Elevation above MSL(ft): 34 - to Same Pool: 1400' 16.Deviated wells: Kickoff depth: 500 feet , 17.Maximum Potential Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 89.4 degrees . Downhole: 3600 + Surface: 2840 ' 18.Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42" 20" 94 H-40 Welded 80 36 36 116 116 10 yds. 13-1/2" 10-3/4" 45.5 L-80 H-563/BTC 2244 36 36 2244 2185 972 sx 11.0 ppg,271 sx 15.8 ppg G 9-7/8 x 11" 7-5/8" 29.7-L-80 H-563/BTC 15809 36 36 15809 7598 1037 sx 15.8 ppg G 6-3/4" Open Hole n/a n/a n/a 11386 15809 7598 27195 7713 Barefoot completion 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effect.Depth MD(ft): Effect.Depth TVD(ft): Junk(measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface .. Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program E Time v.Depth Plot ❑ Shallow Hazard Analysis EI Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program Q 20 AAC 25.050 requirements Q 21. Verbal Approval: Commission Representative: Date CL1r44'4k 'L ( (7 22.I hereby certify that the foregoing is true and the procedure approved herein will not David Lee 263-3741 be deviated from without prior written approval. Contact David.L.Lee(a�co p.com Email Printed Name Chip Alvord Title Drilling Manager Signature ( Phone 265 6120 Date 249(L(-7 /1 A Commission Use Only Permit to Drill API Number: Permit Approve( See cover letter for other Number: a'I r Dt} 50- /3^07,-Q75'.1-00Q0 Date: 31;0 1 ii requirements. ' Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained in shales: r-/ Other: L3�p f c5 f to 35-06) � lC1 1 1 _ Samples req'd: Yes ❑ No El Mud log req'd:Yes ❑ No �V_,/ /1 v`Q y pr—cv cv7 ' ± 5 i "lam z5� rtii sures: Yes ,No ❑ Directional svy req'd:Yes 1_1 ❑(J al ver Pre— NG l'1./?-r. r- i ,�G Spacing exception req'd: Yes ❑ No Inclination-only svy req'd:Yes L❑d No 17 c 1- 2 c A C Z 5• c 3 0---,)Z. Z\ Post initial injection MIT req'd:Yes ,No ❑ APPROVED BY �7 Approved by: //�,� COMMISSIONER THE COMMISSION Date:3—24—( / /i.:-Rae_44 fr7, -'3124/ t- L Submit Form and Form 10-401( evised 11/2015) TI cF itts0i1 f Ant from the date of approval(20 C 25,005(g)) Attachments in Duplicate • ConocoPhillips Alaska,Inc. Post Office Box 100360 Anchorage,Alaska 99510-0360 ConocoPhillips Telephone 907-276-1215 February 6,2017 Alaska Oil and Gas Conservation Commission ECEI VE 333 West 7th Avenue, Suite 100 Anchorage,Alaska 99501 FEB 0 9 2017 Re: Application for Permit to Drill CRU CD5-17 AOGCC Dear Sir or Madam: ConocoPhillipp Alaska,Inc.hereby applies for a Permit to Drill an onshore WAG injection well from the CD5 drilling pad with rig Doyon 19.1 The intended spud date for this well is 4/1/17. CRU CD5-17 is planned to be an Alpine A and C dual lateral injection well,with the Alpine C lateral coverd in the CD5-17L1 PTD.The 13-1/2"surface hole will TD above the C-30 sand.The surface hole will then be cased with 10-3/4"casing and cemented to surface.The intermediate section will be drilled with a 9-7/8"x 11"underreamer BHA and Managed Pressure Drilling technology.This hole will be subsequently cased with a 7-5/8"casing string to surface and cemented to 500' above the uppermost hydrocarbon bearing interval.The suface by intermediate casing annulus will then be evaluated for future annular disposal by performing a leak-off test. The 6-3/4"production section will then be horizontally drilled and completed as an injector in the Alpine A reservoir.The well will be completed as a barefoot completion. A second lateral,CD5-17L1,will then be drilled in the Alpine C Sand,with the upper completion covered in the corresponding PTD application. Please find attached the information required by 20 AAC 25.005 (a) and(c)for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 Application For Permit to Drill per 20 AAC 25.005 (a) 2. A proposed drilling program 3. A proposed completion diagram 4. A drilling fluids program summary 5. Pressure information as required by 20 AAC 25.035 (d)(2) 6. Directional drilling/collision avoidance information as required by 20 AAC 25.050 (b) Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 AAC 25.035 (a)and(b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information,please contact David Lee at 263-3741 (David.L.Lee@cop.com)or Chip Alvord at 265-6120. Sincerely, cc: CD5-17 Well File/Ann Haggerty-Sherrod ATO 1530 Johnson Njoku ATO 1720 Chip Alvord ATO 1570 David Lee Jason McLennan ATO 1790 Drilling Engineer Lanston Chin Kuukpik Corp • Applicalpor Permit to Drill,Well CRU CD5-17 Saved: 9-Feb-17 CD5-17 Application for Permit to Drill Document ConocoPhillips Table of Contents 1. Well Name (Requirements of 20 AAC 25.005 (2) 3 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) 3 Requirements of 20 AAC 25.050(b) 3 3. Blowout Prevention Equipment Information (Requirements of20 AAC 25.005(c)(3)) 3 4. Drilling Hazards Information (Requirements of20AAC 25.005 (c)(4)) 4 5. Procedure for Conducting Formation Integrity Tests (Requirements of 20 AAC 25005 (c)(5)) 5 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) 5 7. Diverter System Information (Requirements of20AAC 25.005(c)(7)) 5 8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8)) 6 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005 (c)(9)) 7 10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10)) 7 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005 (c)(11)) 7 12. Evidence of Bonding (Requirements of20AAC 25.005 (c)(12)) 7 13. Proposed Drilling Program (Requirements of20AAC 25.005 (c)(13)) 7 14. Discussion of Mud and Cuttings Disposal and Annular Disposal 9 (Requirements of 20 AAC 25.005 (c)(14)) 9 15. Attachments 10 Attachment 1 Cement Summary 10 CD5-17 APD Page 1 of 15 Printed:9-Feb-17 • Applicallor Permit to Drill,Well CRU CD5-17 Saved:9-Feb-17 Attachment 2 Drilling Hazards Summary 10 Attachment 3 Completion Schematic 10 Attachment 4 Directional Plan 10 CD5-17 APD Page 2 of 15 Printed:9-Feb-17 Applicator Permit to Drill,Well CRU CD5-17 Saved:9-Feb-17 1. Well Name (Requirements of 20 AAC 25.005(fl) The well for which this application is submitted will be designated as CRU CD5-17. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) Location at Surface 385'FNL,2747'FEL, Sec. 18,T11N,R4E,UM NAD 1927 RKB Elevation 70.3'AMSL Northings: 5,965,829 Eastings: 349,231 Pad Elevation 34'AMSL Top of Productive Horizon(Heel) 1997'FNL,3142'FEL,Sec.21,Ti 1N,R4E,UM NAD 1927 Measured Depth, RKB: 15,809' Northings:5,958,742 Total Vertical Depth, RKB: 7,598' Eastings:359,282 Total Vertical Depth, SS: 7,528' Total Depth (Toe) 1486'FNL,3090'FEL, Sec.34,T11N,R4E,UM NAD 1927 Measured Depth, RKB: 27,195' Northings: 5,948,597 Total Vertical Depth, RKB: 7,713' Eastings: 364,449 Total Vertical Depth, SS: 7,643' Requirements of 20 AAC 25.050(b) Please see Attachment 4: Directional Plan The Applicant is the only affected owner. 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005(c)(3)) Please reference BOP and diverter schematics on file for Doyon 19.f CD5-17 APD Page 3 of 15 Printed:9-Feb-17 Applicalior Permit to Drill,Well CRU CD5-17 Saved: 9-Feb-17 4. Drilling Hazards Information (Requirements of 20 AAC 25.005(c)(4)) The following presents data used for calculation of anticipated surface pressure(ASP)during drilling of this well: CasingSize Cs SettingDepth Fracture Porepressure ASP Drilling 9 P _ _ (in) MD/TVD(ft) Gradient(ppg) (psi) (psi) 20 116/ 116 10.9 52 54 10.75 2,244/2,185 14.5 989 1,430 7.625 15,809/7,598 12.5 3,600 2,840 N/A 27,195/7,713 12.5 3,600 n/a PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE(ASP) ASP is determined as the lesser of 1)surface pressure at breakdown of the formation casing seat with a gas gradient to the surface,or 2)formation pore pressure at the next casing point less a gas gradient to the )face as follows: • 1) ASP=[(FG x 0.052)-0.1]*D !y-9v co) Where: ASP=Anticipated Surface pressure in psi � FG=Fracture gradient at the casing seat in lb/gal 0.052=Conversion from lb./gal to psi/ft 0.1 =Gas gradient in psi/ft D=true Vertical depth of casing seat in ft RKB OR 2) ASP=FPP-(0.1 x D) Where: FPP=Formation Pore Pressure at the next casing point FPP=0.4525 x TVD 1. ASP CALCULATIONS 1. Drilling below 20"conductor ASP=[(FG x 0.052)-0.1]D =[(10.9 x 0.052)-0.1]x 116=54 psi OR ASP=FPP-(0.1 x D) =989-(0.1 x 2185')=771 psi 2. Drilling below 10-3/4"surface casing ASP=[(FG x 0.052)-0.1]D =[(14.5 x 0.052)-0.1]x 2185' = 1430 psi OR ASP=FPP-(0.1 x D) =3600-(0.1 x 7598')=2840 psi 3. Drilling below 7-5/8"intermediate casing ASP=[(FG x 0.052)-0.1]D =[(12.5 x 0.052)-0.1]x 7598=4179 psi OR ASP=FPP-(0.1 x D) =3600-(0.1 x 7598')=2840 psi f CD5-17 APD Page 4 of 15 Printed:9-Feb-17 • Applicar Permit to Drill,Well CRU CD5-17 Saved:9-Feb-17 (B)data on potential gas zones; The well bore is not expected to penetrate any gas zones. (C) data concerning potential causes of hole problems such as abnormally geo-pressured strata,lost circulation zones,and zones that have a propensity for differential sticking; Please see Attachment 2-Drilling Hazards Summary 5. Procedure for Conducting Formation Integrity Tests (Requirements of 20AAC 25.005(c)(5)) Drill out surface casing shoe and perform LOT test or FIT in accordance with the Alpine LOT/FIT procedure that ConocoPhillips Alaska has on file with the Commission. 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) Casing_and Cementing Program Csg/Tbg Hole Weight Length Top MD/TVD Btm MD/TVD OD(in) Size �J (Ib/ft) Grade Conn. (ft) (ft) (ft) Cement Program 20 42 94 H-40 Welded 80 36/36 116/116 10 yrds HYD Cement to Surface with 10-3/4 13.5 45.5 L-80 563 X 2,244 36/36 2,244/2,185 972 sx DeepCrete Lead 11.0 ppg, BTCM 271 sx Class G Tail Slurry 15.8 ppg 7-5/8 9 8i5 29.7 L-80 63DX 15,809 36/36 15,809/7,598 Stage 1: 1037 sx Class G at 15.8 ppg BTCM n/a 6.75 n/a n/a n/a 11,386 15,809/7,598 27,195/7,713 N/A—Barefoot Completion 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) It is requested that a waiver of the diverter requirement under 20 AAC 25.035 (h)(2)is granted. At CD5, fifteen penetrations have been completed and there has not been a significant indication of shallow gas or gas hydrates above the C30 where casing will be set. Ak.c4M ;043 CD5-17 APD Page 5 of 15 Printed:9-Feb-17 • Applicallor Permit to Drill,Well CRU CD5-17 Saved:9-Feb-17 8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8)) Surface Intermediate Production Hole Size in. 13.5 9.875 x 11 6.75 Casing Size in. 10.75 7.625 4.5 Density PPG 9.0— 10.0 9.6— 11.0 9.0—9.5 PV cP 30-80 10 10 YP Ib./100 ft2 100-200 20 - 28 10 - 15 Funnel Viscosity s/qt. 300 50 - 60 40 - 50 Initial Gels Ib./100 ft2 50 10 6 10 Minute Gels Ib./100 ft2 60 15 8 API Fluid Loss cc/30 min. N.C.— 15.0 5.0 4.0 HPHT Fluid Loss cc/30 min. n/a 8.0— 12.0 10.0 pH 11.0 9.5- 10.0 9.0-9.5 Surface Hole: A mixed-metal oxide fresh water drilling fluid(Drilplex)will be used for the surface interval. Keep flow line viscosity at±200 sec/qt while drilling and running casing.Reduce viscosity prior to cementing.Maintain mud weight<10.0 ppg by use of solids control system and dilutions where necessary. Intermediate: Fresh water polymer mud system.Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. There is a slight potential for lost circulation,particularly after the reservoir is penetrated. Maintain mud weight at or below 9.6 ppg and be prepared to add loss circulation material.Good filter cake quality, hole cleaning and maintenance of low drill solids(by diluting as required)will all be important in maintaining wellbore stability.The mud will be weighted up to 10.8—11.0 ppg before pulling out of the hole. Note: Managed Pressure Drilling(MPD)will be utilized for adding backpressure during connections to mitigate shale instability and cycling. Production Hole: The horizontal production interval will be drilled with a water-based mud drill-in fluid(FloPro)weighted to 9.0— 9.5 ppg with calcium carbonate and KCl. Diagram of Doyon 19 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. CD5-17 APD Page 6 of 15 Printed.9-Feb-17 • Applicallor Permit to Drill,Well CRU CD5-17 Saved:9-Feb-17 9. Abnormally Pressured Formation Information (Requirements of20AAC25.005(c)(9)) N/A-Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A-Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of20AAC25.005(c)(1 1)) N/A-Application is not for an offshore well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) The proposed drilling program is listed below. Please refer to Attachment 3: Completion Schematic. 1. MIRU Doyon 19 onto CD5-17. 2. Rig up and test riser,dewater cellar as needed. 3. Drill 13.5"hole to the surface casing point as per the directional plan(LWD Program: GR). 4. Run and cement 10-3/4" surface casing to surface. 5. Install BOPE and MPD equipment. 6. Test BOPE to 250 psi low/3500 psi high(24 hr.AOGCC notice). 7. Pick up and run in hole with 9-7/8"x 11"drilling BHA to drill the intermediate hole section. 8. Chart casing pressure test to 3500 psi for 30 minutes. 9. Drill out 20' of new hole and perform LOT.Maximum LOT to 18.0 ppg.Minimum LOT required to drill ahead is 13.0 ppg EMW. 10. Drill 9-7/8"x 11"hole to section TD using Managed Pressure Drilling to maintain constant bottom hole pressure on connections(LWD Program: GR/Res). ✓ 11. Change out upper pipe rams to 7-5/8"solid bodies and test same to 3,500 psi. 12. Run 7-5/8"casing and cement to 500' above hydrocarbon bearing zones(cementing schematic attached). 13. Change upper pipe rams to 3-1/2"x 6"VBRs. 14. Test BOPE to 250 psi low/3,500 psi high(24 hr.AOGCC notice). 15. Pick up and run in hole with 6-3/4"drilling BHA.Verify top of cement with sonic tool in recorded mode. 16. Chart casing pressure test to 3500 psi for 30 minutes. 17. Drill out shoe track and 20 feet of new formation.Perform LOT to a maximum of 16.0 ppg.Minimum required leak-off value is 11.0 ppg EMW. 18. Drill 6-3/4"hole to section TD(LWD Program: GR/RES/Sonic for TOC evaluation). • 19. Pull out of hole with drilling BHA. 20. Run and set whipstock for kickoff in the Alpine C Sand. 21. Mill window and at least 20 feet of new formation. CD5-17 APD Page 7 of 15 Printed:9-Feb-17 • Applicalbor Permit to Drill,Well CRU CD5-17 Saved: 9-Feb-17 22. POOH and lay down milling BHA. 23. End PTD for CD5-17 and begin PTD for CD5-17L1. CD5-17 APD Page 8 of 15 Printed:9-Feb-17 • Applic.or Permit to Drill,Well CRU CD5-17 Saved:9-Feb-17 14. Discussion of Mud and Cuttings Disposal and Annular Disposal (Requirements of 20 AAC 25.005 (c)(14)) Incidental fluids developed from drilling operations on well CD5-17 will be injected into a permitted surface casing x production casing annulus on CD5. J The CD5-17 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000'TVD. Significant hydrocarbon zones include only the Alpine and Kuparuk sand based on pre-drill interpretations. There will be 500' of cement placed above the top of the Kuparuk reservoir. Once CD5-17 has been drilled and completed, consideration may be given to permit this well for annular injection. An application for Sundry Operations form 10-403 will then be filed. Annular pumping of fluids occurring due to drilling operations,per regulation 20 AAC 25.080 could then begin once properly permitted. As stated above,any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the base of the Schrader Bluff Formation(C-40). These 450-500'thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection,the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure =(12.0 (0.052) (Surf. Shoe TVD)+ 1 500 psi ppg) =(12.0 ppg) * (0.052) * (2,185')+ 1,500 psi =2864 psi Pore Pressure = 1,049 psi Therefore Differential=2864— 1049= 1815 psi. The internal casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85%collapse and burst ratings listed in the following table: OD Wt Grade Range Connection Collapse 85%of Burst 85%of (PO Type Collapse Burst 10-3/4" 45.5 L-80 3 HYD563/BTCM 2470 psi 2100 psi 5210 psi 4429 psi 7-5/8" 29.7 L-80 3 HYD563/BTCM 4790 psi 4071 psi 6890 psi 5856 psi CD5-17 APD Page 9 of 15 Printed:9-Feb-17 • Applic.or Permit to Drill,Well CRU CD5-17 Saved: 9-Feb-17 15. Attachments Attachment 1 Cement Summary Attachment 2 Drilling Hazards Summary Attachment 3 Completion Schematic Attachment 4 Directional Plan CD5-17 APD Page 10 of 15 Printed:9-Feb-17 • Applicallor Permit to Drill,Well CRU CD5-17 Saved:9-Feb-17 Attachment 1 —Cement Summary CD5-17 Cementing Program: CD5-17_wp07 Schematic oL 20"94#H-40 Welded Conductor to 116' I 10-3/4"45.5#L-80 HYD563/BTCM bit 2,244' MD/2,185'TVD @ 25°inc. K2-Qannik 5,802'MD/4,038'TVD 9-7/8"x 11" Hole Top of Cement 13,300' MD/7,080'TVD Kuparuk C 13,882' MD/7,298'TVD 7-5/8"29.7 L-80 HYD563 X BTCM Casing y ' F.0 15,809' MD/7,598'TVD @ 86° Alpine C ‘. 14,791' MD/7,487'TVD \ 1 ` Alpine A 15,809' MD/7,598'TVD v 6-3/4" Hole 27,195'MD/7,713@90° CD5-17 APD Page 11 of 15 Printed:9-Feb-17 S Applicalkr Permit to Drill,Well CRU CD5-17 Saved: 9-Feb-17 10.75"Surface Casing run to 2,244'MD/2,185' TVD Cement from 2244' MD to 1744'(500' of tail)with Class G+Adds. @ 15.8 PPG,and from 1744'to surface with 11.0 ppg DeepCrete.Assume 250%excess annular volume in permafrost and 50%excess below the permafrost (1323' MD),zero excess in 20"conductor. Lead slurry from 1,744'MD to surface with Arctic Lite Crete @ 11.0 ppg Conductor (116'—36') X 1.3645 ft3/ft X 1.0 (0%excess) = 109 ft3 Permafrost to Conductor (1,323'— 116') X 0.3637 ft3/ft X 3.5 (250%excess) = 1,536 ft3 Top of Tail to Permafrost (1,744'— 1,323')X 0.3637 ft3/ft X 1.5 (50%excess) = 230 ft3 Total Volume = 109 + 1,536 + 230 = 1,875 ft3=> 972 sx of 11.0 ppg DeepCrete @ 1.93 ft3/sk Tail slurry from 2,244'MD to 1,744'MD with 15.8 ppg Class G + additives Shoe to Top of Tail (2,244'—1,744')X 0.3637 ft3/ft X 1.50 (50%excess) = 273 ft3 Shoe Joint (80')X 0.5400 ft3/ft X 1.0(0%excess) = 43 ft3 Total Volume = 273 + 43 = 316 ft3 => 271 sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8%S002 accelerator @ 1.17 ft3/sk 7.625"Intermediate Casing run to 15,809' MD/7,598' TVD Top of slurry is designed to be at 13,300' MD,which is 500' above the Kuparuk C.Assume 40%excess annular volume. *11"Under reamer is 120' above the 9-7/8"bit. Tail slurry from 15,809'MD to 13,300'MD with 15.8 ppg Class G + additives Shoe to top of 9-7/8"Hole (15,809'— 15,689')X 0.2148 ft3/ft X 1.40 (40%excess) = 36 ft3 11"Hole to to Top of Cement (15,689'— 13,300')X 0.3428 ft3/ft X 1.40 (40%excess) = 1146ft3 Shoe Joint (80')X 0.2578 ft3/ft X 1.0 (0%excess) = 21 ft3 Total Volume = 36+ 1146 + 21 = 1203 ft3 => 1037 sx of 15.8 ppg Class G + 0.2% D046 antifoamer,0.3% D065 dispersant and 0.8%S002 accelerator @ 1.16 ft3/sk CD5-17 APD Page 12 of 15 Printed:9-Feb-17 • ApplicalOor Permit to Drill,Well CRU CD5-17 Saved: 9-Feb-17 Attachment 2— Drilling Hazards Summary (To be posted in Rig Floor Doghouse Prior to Spud) 13-1/2" Hole/10-3/4"Casing Interval Event Risk Level Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low Gyro single shots,traveling cylinder diagrams Monitor well at base of permafrost,increased mud weight,decreased Gas Hydrates Low mud viscosity,increased circulating times,controlled drilling rates, low mud temperatures Running Sands and Gravel Low Maintain planned mud parameters,Increase mud weight,use weighted sweeps. Lost Circulation Low Reduced pump rates,mud rheology,lost circulation material,use of low density cement slurries 9-7/8"x 11" Hole/7-5/8"Casing Interval Event Risk Level Mitigation Strategy Reduced pump rates,reduced trip speeds,real time equivalent Lost circulation Low circulating density(ECD)monitoring,mud rheology,lost circulation material Hole swabbing on trips Low Annular pressure applied by managed pressure drilling equipment. Abnormal Reservoir Pressure Low Well control drills,increased mud weight.No mapped faults occur across the path of the planned wellbore. Hydrogen Sulfide gas Low H25 drills,detection systems, alarms,standard well control practices, mud scavengers 6-3/4"Open Hole Production Interval Event Risk Level Mitigation Strategy Reduced pump rates,reduced trip speeds,real time equivalent Lost circulation Low circulating density(ECD)monitoring,mud rheology,lost circulation material Hole swabbing on trips Low Annular pressure applied by managed pressure drilling equipment. Abnormal Reservoir Pressure Low Well control drills,increased mud weight. Hydrogen Sulfide gas Low H2S drills,detection systems,alarms,standard well control practices, mud scavengers CD5-17 APD Page 13 of 15 Printed:9-Feb-17 Applicaillor Permit to Drill,Well CRU CD5-17 Saved:9-Feb-17 Well Proximity Risks: Directional drilling/collision avoidance information as required by 20 ACC 25.050(b)is provided in the following attachments. Drilling Area Risks: Reservoir Pressure: Offset production has the potential to reduce the reservoir pressure. LCM material will be on location to deal with losses. Weak sand stringers could be present in the overburden. LCM material will be available to seal in losses in the intermediate section. Lower Shale Stability: HRZ/Kalubik/Miluveach and instability in the intermediate interval will require higher mud weights and managed pressure drilling in order to stabilize the formations. Standard LCM material and well bore strengthening pills are expected to be effective in dealing with lost circulation if needed. CD5-17 APD Page 14 of 15 Printed:9-Feb-17 • Applicator Permit to Drill,Well CRU CD5-17 Saved: 9-Feb-17 Attachment 3—Completion Schematic (includes Alpine C lateral, as detailed in CD5-17L1 PTD) CD5- 17 Alpine A/C Dual Lateral Injector Proposed Schematic 20"94#H 40 Welded Upper Completion: AH11 1k Conductor to 116'MD 1)4-'/2'12.6#/ft TXP 2)Shallow nipple profile 3)4-W x 1"Cameo KBMG GLM(xx°)w/DCK2 pinned for 2500 psi casing to tbg shear 4)Baker Premier Packer 5)CMU sliding sleeve 6)DB nipple 3.75"ID '` Lower Completion: "'`I ' ` 7) Open Hole Completion in A/C sand ._ 10-3/4"45#L-80 H563 M. Surface Casing at 2,244'MD no junction 8)ZXP liner top packer&Flexlock Liner Hanger XO 5"Hydril 521 Box X 4-1/2"IBTM pin 100'4.5"12.6#L-80 Tail(-100') 4-1/2" 12.6#L-80 TXP 7 5/8"29#L-80 Hyd 563/BTCM Intermediate Casing at 15,809'MD 'fqii QC sand Lateral 6 3/4"Hole TD 14,926'-27,219'MD Production Packer ~ 7/'' I at 13,900'MD I'" A sand Lateral 6 3/4"Hole TD 15,809'-27,195'MD CMU Sliding sleeve -,,,,,,„,,„,,,,,g,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, for Selectivity ZXP liner top packer(whipstock base)at 15,100'MD CD5-17 APD Page 15 of 15 Printed:9-Feb-17 • • CD5-17wp09 7.279 Plan Summary '.5 C-0310 164. 1a11tlt the A -5 --- N - I I I,I 1 - , III I • -• B.,: , BaUOian 97Albian 96 FCS e' , • Ii - o ,f 1 1 ' ti I I 1 1 I I I I I I I 1- 1 o7 �1�1�\k, r0 6500 13000 19500 26000 '` I20"x 42"� Measured Depth o--.'0° 120"x 421 Depth Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) r�00� Rig: Doyon 19 . i..•0 110-3/4"x 13-1/2'j I ... . 1 o .00-00---- • o o v h0 $ 00 0 ....---- °' _ r° ^0 00°00 00 o I7-5/8"X 9-7/8"by 11" �4-12"x 6-314"I 0 • m 000 00 00 00 o / o ^ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05 o - ^ ^0°�°v $ 0 0 0 0 0" o 0 0 0 o I0- 0 ie. ao a) O .'-�N th C O Iry,. yr (D - rr .-- r N NOJN N N N N I(•QJ , I 1 , I , i l 1 i I 1 'y/ p Q pp I I I I I I I I I I I I I I I I I I I I I I~I I /.� t5 O DO OO Q 36 s d 0 2500 5000 7500 10000 12500 15000 17500 20000 22500 2500( 0 500 - 690 Horizontal Departure • 690 - 970 336 ••......, ....„. .. Not - i3 870 - 1060 Ili 60 2 I) 111.11111 ' A: ® luso - 1240 9 300,:t • �� 60 1430 - 1610 a .--ASI I- ,` ��0' _ tl, 1610 - 1800 UJ .. r,� I ',W,.---;.::: 1800- 2860 cli 30 .��• s 3930 - 4990 �r Uo ._.... 270/ior I I +. � - 90 4990 - 6050 .�o _ _ .,...."--..t,:;.1- 6050 - 7110 1 !' - 7110 - 8170 ecu ..,e I ,)I f`c ` 8170 - 9240 D F Rte.%oa P. �>• 9240 - 10300 ew - 10300- 12410 0 4000 8000 12000 16000 20000 24000 28000 240\` \��` �T s#Q�g 3���.y' 128 12410- 14520 SURVEY PROGRAM .`��\o`��. Alp?: .1.I..';-=. :� 14520 - 16640 '-'="•:. .� o,`t�?, - • 16640 - 18750 epth From Depth To Survey/Plan Tool jj :s Pad Elevati on:34.00 .�, i�, . 18750 - 20860 36.30 400.00 CD5-17wp09(Plan:CD5-17) INC a10 �- _ ., .. 20860 22970 36.30 1000.00 CD5-17wp09(Plan:CD5-17) GYD-GC-SS • 19iti��:yjall R5s7 1000.00 2000.00 CD5-17wp09(Plan:CD5-17) MWD CASING DETAILS 22970 25080 1000.00 2224.15 CD5-17wp09(Plan:CD5-17) MWD+IFR-AK-CAZ-SC 25080 - 27195 2224.15 3724.15 CD5-17wp09(Plan:CD5-17) MWD TVD MD Name - M 2224.15 15809.06 CD5-17wp09(Plan:CD5-17) MWD+IFR-AK-CAZ-SC 115.30 115.30 20"x 42" Magnetic Model: BGGM2016 T 15809.06 17309.06 CD5-17wp09(Plan:CD5-17) MWD 2185.30 2224.15 10-3/4"x 13-12" Magnetic Model Date: 22-Apr-17 15809.06 27195.19 CD5-17wp09(Plan:CD5-17) MWD+IFR-AK-CAZ-SC 7598.30 15809.06 7-5/8"X 9-7/8"by 11" Magnetic Declination: 17.20° 7713.30 27195.19 4-1/2"x 6-3/4" To convert a Magnetic Direction to a True Direction,Add 17.20°East SECTION DETAILS = 1320.3 Sec MD Inc Azi TVD +N/-S +E/-W Dleg TFace VSect Target Annotation 1 36.30 0.00 0.00 36.30 0.00 0.00 0.00 0.00 0.00 Base Permafrost 2 500.00 0.00 0.00 500.00 0.00 0.00 0.00 0.00 0.00 KOP:Start 1.51100'DLS,10°TF,for 100.01' 3 600.01 1.50 10.00 600.00 1.29 0.23 1.50 10.00 -1.03 Start 21100'DLS,0°TF,for 150.22' 4 750.23 4.50 10.00 750.00 9.04 1.59 2.00 0.00 -7.23 Adjust TF to 140°,for 521.93' -2321.1 5 1272.17 7.56 127.69 1270.30 8.23 32.40 2.00 140.00 7.94 Hold for 100.88' G30 6 1373.04 7.56 127.69 1370.30 0.12 42.90 0.00 0.00 20.03 Start 21100'DLS,-7.82°TF for 851.1' 7 2224.15 24.53 122.19 2185.30 -129.17 238.15 2.00 -7.82 225.86 Hold for 20' -2854.3 8 2244.15 24.53 122.19 2203.49 -133.59 245.18 0.00 0.00 233.06 Start 31100'DLS.-3.74°TF,for 1385.92' 9 3630.07 66.07 119.47 3157.19 -620.01 1076.93 3.00 -3.74 1053.02 Hold for 9837.17' 10 13467.24 66.07 119.47 7147.14 -5043.77 8905.12 0.00 0.00 8634.09 Start 3°/100'DLS,67.23°TF,for 1233.58' C-10 11 14700.82 83.63 153.42 7477.30 -5899.29 9697.98 3.00 67.23 9761.69 Hold for 225.33' 12 14926.15 83.63 153.42 7502.30 -6099.56 9798.18 0.00 0.00 9985.56 CD5-17 00.L1TOW 011117 DK Start 11100'DLS,-74.88°TF,for 0.32' 13 14926.47 83.63 153.42 7502.34 -6099.85 9798.33 1.00 -74.88 9985.88 Start 11100'DLS,-74.88°TF,for 0.32' -3805.4 14 15714.49 83.63 153.42 7589.75 -6800.21 10148.79 0.00 0.00 10768.80 Start 31100'DLS,-33.46°TF,for 94.57' K-3 15 15809.06 86.00 151.85 7598.30 -6883.85 10192.08 3.00 -33.4610862.97 CD5-17 01.Heel 011117 DK Hold for 20' -VI 16 15829.06 86.00 151.85 7599.70 -6901.44 10201.49 0.00 0.00 10882.92 Start 31100'DLS,0°TF,for 114.82' 17 15943.89 89.44 151.85 7604.26 -7002.59 10255.62 3.00 0.0010997.64 Hold for 11251.3' K-2 Base 18 27195.19 89.44 151.85 7713.30-16922.50 15563.64 0.00 0.0022248.37 CD5-17 02.Toe 011117 DK TD:27195.19'MD,7713.3'TVD -4819.5 Alban 97 TCR required -5891.7 �y� /► � � . . .. : Alban 96 ern •a4 -70 Top _;1.1r 7;g :•3 .1 TOW By signing this I acknowledge that I have been informed of all risks,checked that the data is correct,ensured it's completeness,and all surrounding wells are assigned to the proper position and I approve the scan and collision avoid nce plan as set out in the audit sack annrove it as the hasis for the final well plan and wellsite drawings I also acknowledge that unless notified otherwise all targets t)ave a 1011 feet lateral tolerance Prepared by: Checked by: Accepted by: Approved by. Brij Potnis Nate Beck Erik Stark Lee,Njoku Compass Workspace • • a) 5 a3 P 5_ • 0 C p .3 00- ,- cp r�� Y o o 0 .3 �<> o e Ns- •� o r LA0 00 0 °0 °`�C, vo 0 00 s� -o tit; Z I- 0 % °°cam �� = o 0 o 0 0, ael 0. j , O 00 0� co co Q o 0 Op O! x —o U \ 00 II Op (� N O 0 �! / .- 1 p o Opp ' `- O4 2 *4 °0° o n GL (5 Nia) 00 . W u O ° , _ °°00z Viz O a) O 4.4 3Co °°°6. X CO ° °°°8 N- (4 °°<' V Q °°° ♦ 9 O O 00 °p°S\ co O C. filij °n N t ° _ 11k- o �, - x Q = CNO •► x O i -o CO a ' O O O O O O O O O O O O O O O O COCO a) Nin r (+)410N/(-)1-11noS • • -/ , -00 O _ N if N i Iv wd O c.'S a a.) x , Q � _ -i- • ■N 0 c; r ; N (/) O , rO In l co % / 0,, 40 -O _ w N a. CL } O �� C Q -Q Ca T 4. W ca + Wcu Q w O —N U) Z 0 CO U) 0) 0 O 0 I I 0 `rr-,..... LO Q. 0 Z - Ii N a = o 1- Z s TII_ I O o 0 0 o 0 "Si" 00 N (0 I x- T- (+)ypoN/(-)gTnoS 111111111 I I 1 I ! 866. ii, , 00002 E ' o o � 1-, CO O x 000 Z I ' (...N....1 G� 000 000 o o _ 1 00 000eg o r III MEM vima 00 0) DDOC o col) i i LO O 0 a B N— U \ `\ 0002 r p . `\ I O 0 `\ . , O N 121_ .\\\ `,0uOL,I ° o v e = N - CI)Y , . ca U ` . . ' YJ94. c ,�r' � o (6 0151.` ; 0) O U Q O0 X o co 07 > �, LI c /, r as f6 \ n, N Q \ coC) 0 ,' 0 0 O o ..- • CO 10 E °Qo ; a r r' o 1 a) c? U O 14 m 0 00, C , o O 0c 0 --.Q 1 N 0 r i \, 1 oI O O O O O Ln x O LO O Ln CO !p ldea IeoeA anal x co r� 0 N 0 • O O co LOdM6-5aa----- N 1 o ,odmz L10 N CD Poo- - . C 0 0 . N W CO O O 0 0 O O 1 N Lo r d O ii O C N/ O ) O Q� U 009 0 o - o o co 2 U r O ^L^,, ^W L ) Q CTS / � , m P 1 C7 �, c t" O \ N ►� ` a_ -o O X X M O o N O —0 1- I 1 I I I O O O O O O LU O co O in cc co 0) (0 N q daa Ie3!1JN CO A anJ± • ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Plan: CD5-17 Plan: CD5-17 Plan: CD5-17wp09 Standard Proposal Report s� rt 03 February, 2017 Y id rhp 1111 1'11'1111 110 • • SLB Standard Proposal Report EDM Production Local Co-ordinate Reference„ Well Plan:CD5-17 Company: ConocoPhillips(Alaska)Inc.-WNS + '" Plan:34+36.3©70 30usft(Doyon 19) Project: Western North Slope MD eference Plan:34 +36.3 @ 70.30usft(Doyon 19) CD5 Alpine West Pad North Reference m True Plan:CD5-17 Survey t!,,„, . Ali Minimum Curvature Wellbore: Plan:CD5-17 Design: CD5-17wp09 Western North Slope,North Slope Alaska,United States System Datum: Mean Sea Level Using Well Reference Point Using geodetic scale factor oma Sit-1,;,1/11'1:10' CD5 Alpine West Pad Site Position: From: Map Position Uncertainty: 0.00 usft Slot Radius: 13-3/16" Well Plan:CD5-17 Well Position +N/-S 0.00 usft +E/-W 0.00 usft Position Uncertainty 0.00 usft Ground Level: 34.00 usft Wellbore Plan:CD5-17 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) O (nT) BGGM2016 4/22/2017 17.20 80.81 57,504 Design CD5-17wp09 ,Ama 1maiiiidm 011 _� ?''t9a'l"J'TT✓91WW3 Audit Notes: Version: Phase: PROTOTYPE Tie On Depth: 36.30 Vertical Section: Depth From(TVD) +NI-S ` (usft) l'IL.PR ( �1:th rll'9, 36.30 0.00 0.00 152.00 2/3/2017 3.26:06PM Page 2 COMPASS 5000.1 Build 74 • 0 SLB Standard Proposal Report 11 Database: EDM Production Local Co-ordinate Reference: Well Plan:CD5-17 rr Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) r Project: Western North Slope MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan:CD5-17 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD5-17 Design: CD5-17wp09 4,, E Plan Sections Measured Vertical TVD Dogleg Build Turn Depth Inclination Azimuth Depth System +NI-S +E/-W Rate Rate Rate Tool Face (usft) (°) (°) (usft) usft (usft) (usft) (°/100usft) (°/100usft) (°/100usft) O ,w 36.30 0.00 0.00 36.30 -34.00 0.00 0.00 0.00 0.00 0.00 0.00 500.00 0.00 0.00 500.00 429.70 0.00 0.00 0.00 0.00 0.00 0.00 600.01 1.50 10.00 600.00 529.70 1.29 0.23 1.50 1.50 0.00 10.00 750.23 4.50 10.00 750.00 679.70 9.04 1.59 2.00 2.00 0.00 0.00 1,272.17 7.56 127.69 1,270.30 1,200.00 8.23 32.40 2.00 0.58 22.55 140.00 1,373.04 7.56 127.69 1,370.30 1,300.00 0.12 42.90 0.00 0.00 0.00 0.00 2,224.15 24.53 122.19 2,185.30 2,115.00 -129.17 238.15 2.00 1.99 -0.65 -7.82 2,244.15 24.53 122.19 2,203.49 2,133.19 -133.59 245.18 0.00 0.00 0.00 0.00 3,630.07 66.07 119.47 3,157.19 3,086.89 -620.01 1,076.93 3.00 3.00 -0.20 -3.74 13,467.24 66.07 119.47 7,147.14 7,076.84 -5,043.77 8,905.12 0.00 0.00 0.00 0.00 14,700.82 83.63 153.42 7,477.30 7,407.00 -5,899.29 9,697.98 3.00 1.42 2.75 67.23 14,926.15 83.63 153.42 7,502.30 7,432.00 -6,099.56 9,798.18 0.00 0.00 0.00 0.00 14,926.47 83.63 153.42 7,502.34 7,432.04 -6,099.85 9,798.33 1.00 0.26 -0.97 -74.88 15,714.49 83.63 153.42 7,589.75 7,519.45 -6,800.21 10,148.79 0.00 0.00 0.00 0.00 15,809.06 86.00 151.85 7,598.30 7,528.00 -6,883.85 10,192.08 3.00 2.51 -1.66 -33.46 15,829.06 86.00 151.85 7,599.70 7,529.40 -6,901.44 10,201.49 0.00 0.00 0.00 0.00 15,943.89 89.44 151.85 7,604.26 7,533.96 -7,002.59 10,255.62 3.00 3.00 0.00 0.00 27,195.19 89.44 151.85 7,713.30 7,643.00 -16,922.50 15,563.64 0.00 0.00 0.00 0.00 2/3/2017 3:26:06PM Page 3 COMPASS 5000.1 Build 74 • SLB Standard Proposal Report Database: EDM Production ;Local Co-ordinate Reference: Well Plan:CD5-17 Company: ConocoPhillips(Alaska)Inc.-WNS + = /C6t Plan:34+36.3 @ 70.30usft(Doyon 19) Project: Western North Slope DReference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan:CD5-17 $tt , Minimum Curvature Wellbore: Plan:CD5-17 Design: CD5-17wp09 Planned Survey Measured Vertical Depth Inclination Azimuth Depth TVDss +N/-S +E/-W DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) -34.00 36.30 0.00 0.00 36.30 -34.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00 100.00 29.70 0.00 0.00 0.00 0.00 115.30 0.00 0.00 115.30 45.00 0.00 0.00 0.00 0.00 20"x 42" 200.00 0.00 0.00 200.00 129.70 0.00 0.00 0.00 0.00 300.00 0.00 0.00 300.00 229.70 0.00 0.00 0.00 0.00 400.00 0.00 0.00 400.00 329.70 0.00 0.00 0.00 0.00 500.00 0.00 0.00 500.00 429.70 0.00 0.00 0.00 0.00 KOP:Start 1.5°/100'DLS,10°TF,for 100.01' 600.00 1.50 10.00 599.99 529.69 1.29 0.23 1.50 -1.03 600.01 1.50 10.00 600.00 529.70 1.29 0.23 1.50 -1.03 _, "Start 2°/100'DLS,0°TF,for 150.22' 700.00 3.50 10.00 699.89 629.59 5.58 0.98 2.00 -4.47 750.23 4.50 10.00 750.00 679.70 9.04 1.59 2.00 -7.23 Adjust TF to 140°,for 521.93' 800.00 3.80 19.71 799.63 729.33 12.51 2.49 2.00 -9.88 900.00 2.93 51.08 899.47 829.17 17.24 5.59 2.00 -12.59 1,000.00 3.28 88.15 999.33 929.03 18.93 10.44 2.00 -11.82 1,100.00 4.57 110.88 1,099.10 1,028.80 17.60 17.02 2.00 -7.55 1,200.00 6.25 122.60 1,198.66 1,128.36 13.25 25.33 2.00 0.19 1,272.17 7.56 127.69 1,270.30 1,200.00 8.23 32.40 2.00 7.94 Hold for 100.88' 1,300.00 7.56 127.69 1,297.89 1,227.59 5.99 35.30 0.00 11.28 1,322.61 7.56 127.69 1,320.30 1,250.00 4.18 37.65 0.00 13.99 Base Permafrost 1,373.04 7.56 127.69 1,370.30 1,300.00 0.12 42.90 0.00 20.03 Start 2°/100'DLS,-7.82°TF,for 851.1' 1,400.00 8.09 127.17 1,397.00 1,326.70 -2.11 45.81 2.00 23.37 1,500.00 10.08 125.72 1,495.74 1,425.44 -11.47 58.53 2.00 37.61 1,600.00 12.07 124.74 1,593.88 1,523.58 -22.54 74.22 2.00 54.75 1,700.00 14.06 124.04 1,691.28 1,620.98 -35.30 92.89 2.00 74.78 1,800.00 16.06 123.50 1,787.84 1,717.54 -49.74 114.49 2.00 97.67 1,900.00 18.06 123.09 1,883.44 1,813.14 -65.84 139.01 2.00 123.39 2,000.00 20.05 122.75 1,977.96 1,907.66 -83.57 166.42 2.00 151.92 2,100.00 22.05 122.47 2,071.28 2,000.98 -102.93 196.68 2.00 183.21 2,200.00 24.05 122.24 2,163.29 2,092.99 -123.88 229.75 2.00 217.24 2,224.15 24.53 122.19 2,185.30 2,115.00 -129.17 238.15 2.00 225.86 Hold for 20'-10-3/4"x 13-1/2" 2,244.15 24.53 122.19 2,203.49 2,133.19 -133.59 245.18 0.00 233.06 Start 3°/100'DLS,-3.74°TF,for 1385.92' 2,300.00 26.20 121.94 2,253.96 2,183.66 -146.30 265.46 3.00 253.80 2,375.58 28.47 121.65 2,321.10 2,250.80 -164.58 294.96 3.00 283.79 C-30 2,400.00 29.20 121.56 2,342.49 2,272.19 -170.75 304.99 3.00 293.94 2,500.00 32.19 121.25 2,428.47 2,358.17 -197.34 348.55 3.00 337.88 2/3/2017 3:26:06PM Page 4 COMPASS 5000.1 Build 74 • S SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Plan.CD5-17 Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Project: Western North Slope MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan:CD5-17 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD5-17 Design: CD5-17wp09 y' Planned Survey Measured Vertical Depth Inclination Azimuth Depth TVDss +N/-S +E/-W DLS Vert Section (usft) (°) (0) (usft) usft (usft) (usft) 2,441.36 2,600.00 35.19 120.99 2,511.66 2,441.36 -226.00 396.04 3.00 385.48 2,700.00 38.19 120.76 2,591.84 2,521.54 -256.65 447.32 3.00 436.61 2,800.00 41.18 120.56 2,668.79 2,598.49 -289.20 502.24 3.00 491.14 2,900.00 44.18 120.38 2,742.29 2,671.99 -323.57 560.67 3.00 548.92 3,000.00 47.18 120.22 2,812.15 2,741.85 -359.67 622.44 3.00 609.78 3,063.15 49.07 120.13 2,854.30 2,784.00 -383.30 663.08 3.00 649.73 C-10 3,100.00 50.18 120.08 2,878.17 2,807.87 -397.38 687.37 3.00 673.57 3,200.00 53.18 119.94 2,940.17 2,869.87 -436.61 755.30 3.00 740.10 3,300.00 56.17 119.82 2,997.99 2,927.69 -477.26 826.03 3.00 809.19 3,400.00 59.17 119.71 3,051.46 2,981.16 -519.20 899.38 3.00 880.66 3,500.00 62.17 119.60 3,100.43 3,030.13 -562.33 975.13 3.00 954.31 3,600.00 65.17 119.50 3,144.78 3,074.48 -606.53 1,053.09 3.00 1,029.93 3,630.07 66.07 119.47 3,157.19 3,086.89 -620.01 1,076.93 3.00 1,053.02 Hold for 9837.17' 3,700.00 66.07 119.47 3,185.56 3,115.26 -651.46 1,132.58 0.00 1,106.92 3,800.00 66.07 119.47 3,226.12 3,155.82 -696.43 1,212.16 0.00 1,183.98 3,900.00 66.07 119.47 3,266.68 3,196.38 -741.40 1,291.74 0.00 1,261.05 4,000.00 66.07 119.47 3,307.24 3,236.94 -786.37 1,371.31 0.00 1,338.12 4,100.00 66.07 119.47 3,347.80 3,277.50 -831.34 1,450.89 0.00 1,415.18 4,200.00 66.07 119.47 3,388.36 3,318.06 -876.31 1,530.47 0.00 1,492.25 4,300.00 66.07 119.47 3,428.92 3,358.62 -921.28 1,610.05 0.00 1,569.31 4,400.00 66.07 119.47 3,469.48 3,399.18 -966.25 1,689.62 0.00 1,646.38 4,500.00 66.07 119.47 3,510.04 3,439.74 -1,011.22 1,769.20 0.00 1,723.44 4,600.00 66.07 119.47 3,550.60 3,480.30 -1,056.19 1,848.78 0.00 1,800.51 4,700.00 66.07 119.47 3,591.16 3,520.86 -1,101.16 1,928.36 0.00 1,877.57 4,800.00 66.07 119.47 3,631.72 3,561.42 -1,146.13 2,007.94 0.00 1,954.64 4,900.00 66.07 119.47 3,672.28 3,601.98 -1,191.10 2,087.51 0.00 2,031.70 5,000.00 66.07 119.47 3,712.84 3,642.54 -1,236.07 2,167.09 0.00 2,108.77 5,100.00 66.07 119.47 3,753.40 3,683.10 -1,281.04 2,246.67 0.00 2,185.84 5,200.00 66.07 119.47 3,793.96 3,723.66 -1,326.01 2,326.25 0.00 2,262.90 5,228.21 66.07 119.47 3,805.40 3,735.10 -1,338.70 2,348.70 0.00 2,284.65 K-3 5,300.00 66.07 119.47 3,834.52 3,764.22 -1,370.98 2,405.82 0.00 2,339.97 5,400.00 66.07 119.47 3,875.08 3,804.78 -1,415.95 2,485.40 0.00 2,417.03 5,500.00 66.07 119.47 3,915.64 3,845.34 -1,460.92 2,564.98 0.00 2,494.10 5,600.00 66.07 119.47 3,956.20 3,885.90 -1,505.89 2,644.56 0.00 2,571.16 5,700.00 66.07 119.47 3,996.76 3,926.46 -1,550.86 2,724.13 0.00 2,648.23 5,800.00 66.07 119.47 4,037.32 3,967.02 -1,595.83 2,803.71 0.00 2,725.29 5,802.43 66.07 119.47 4,038.30 3,968.00 -1,596.92 2,805.64 0.00 2,727.16 K-2 5,900.00 66.07 119.47 4,077.88 4,007.58 -1,640.80 2,883.29 0.00 2,802.36 5,966.14 66.07 119.47 4,104.70 4,034.40 -1,670.54 2,935.92 0.00 2,853.33 K-2 Base 6,000.00 66.07 119.47 4,118.44 4,048.14 -1,685.77 2,962.87 0.00 2,879.43 2/3/2017 3:26:06PM Page 5 COMPASS 5000.1 Build 74 • 0 SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Plan:CD5-17 Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Project: Western North Slope MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan:CD5-17 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD5-17 Design: CD5-17wp09 Planned Survey Measured Vertical Depth Inclination Azimuth Depth TVDss +N/-S +E/-W DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) 4,088.70 6,100.00 66.07 119.47 4,159.00 4,088.70 -1,730.74 3,042.45 0.00 2,956.49 6,200.00 66.07 119.47 4,199.56 4,129.26 -1,775.71 3,122.02 0.00 3,033.56 6,300.00 66.07 119.47 4,240.11 4,169.81 -1,820.68 3,201.60 0.00 3,110.62 6,400.00 66.07 119.47 4,280.67 4,210.37 -1,865.65 3,281.18 0.00 3,187.69 6,500.00 66.07 119.47 4,321.23 4,250.93 -1,910.62 3,360.76 0.00 3,264.75 6,600.00 66.07 119.47 4,361.79 4,291.49 -1,955.59 3,440.33 0.00 3,341.82 6,700.00 66.07 119.47 4,402.35 4,332.05 -2,000.55 3,519.91 0.00 3,418.88 6,800.00 66.07 119.47 4,442.91 4,372.61 -2,045.52 3,599.49 0.00 3,495.95 6,900.00 66.07 119.47 4,483.47 4,413.17 -2,090.49 3,679.07 0.00 3,573.01 7,000.00 66.07 119.47 4,524.03 4,453.73 -2,135.46 3,758.64 0.00 3,650.08 7,100.00 66.07 119.47 4,564.59 4,494.29 -2,180.43 3,838.22 0.00 3,727.15 7,200.00 66.07 119.47 4,605.15 4,534.85 -2,225.40 3,917.80 0.00 3,804.21 7,300.00 66.07 119.47 4,645.71 4,575.41 -2,270.37 3,997.38 0.00 3,881.28 7,400.00 66.07 119.47 4,686.27 4,615.97 -2,315.34 4,076.96 0.00 3,958.34 7,500.00 66.07 119.47 4,726.83 4,656.53 -2,360.31 4,156.53 0.00 4,035.41 7,600.00 66.07 119.47 4,767.39 4,697.09 -2,405.28 4,236.11 0.00 4,112.47 7,700.00 66.07 119.47 4,807.95 4,737.65 -2,450.25 4,315.69 0.00 4,189.54 7,728.47 66.07 119.47 4,819.50 4,749.20 -2,463.06 4,338.34 0.00 4,211.48 Albian 97 7,800.00 66.07 119.47 4,848.51 4,778.21 -2,495.22 4,395.27 0.00 4,266.60 7,900.00 66.07 119.47 4,889.07 4,818.77 -2,540.19 4,474.84 0.00 4,343.67 8,000.00 66.07 119.47 4,929.63 4,859.33 -2,585.16 4,554.42 0.00 4,420.73 8,100.00 66.07 119.47 4,970.19 4,899.89 -2,630.13 4,634.00 0.00 4,497.80 8,200.00 66.07 119.47 5,010.75 4,940.45 -2,675.10 4,713.58 0.00 4,574.87 8,300.00 66.07 119.47 5,051.31 4,981.01 -2,720.07 4,793.15 0.00 4,651.93 8,400.00 66.07 119.47 5,091.87 5,021.57 -2,765.04 4,872.73 0.00 4,729.00 8,500.00 66.07 119.47 5,132.43 5,062.13 -2,810.01 4,952.31 0.00 4,806.06 8,600.00 66.07 119.47 5,172.99 5,102.69 -2,854.98 5,031.89 0.00 4,883.13 8,700.00 66.07 119.47 5,213.55 5,143.25 -2,899.95 5,111.46 0.00 4,960.19 8,800.00 66.07 119.47 5,254.11 5,183.81 -2,944.92 5,191.04 0.00 5,037.26 8,900.00 66.07 119.47 5,294.67 5,224.37 -2,989.89 5,270.62 0.00 5,114.32 9,000.00 66.07 119.47 5,335.23 5,264.93 -3,034.86 5,350.20 0.00 5,191.39 9,100.00 66.07 119.47 5,375.79 5,305.49 -3,079.83 5,429.78 0.00 5,268.46 9,200.00 66.07 119.47 5,416.35 5,346.05 -3,124.80 5,509.35 0.00 5,345.52 9,300.00 66.07 119.47 5,456.91 5,386.61 -3,169.77 5,588.93 0.00 5,422.59 9,400.00 66.07 119.47 5,497.47 5,427.17 -3,214.74 5,668.51 0.00 5,499.65 9,500.00 66.07 119.47 5,538.03 5,467.73 -3,259.71 5,748.09 0.00 5,576.72 9,600.00 66.07 119.47 5,578.59 5,508.29 -3,304.68 5,827.66 0.00 5,653.78 9,700.00 66.07 119.47 5,619.15 5,548.85 -3,349.65 5,907.24 0.00 5,730.85 9,800.00 66.07 119.47 5,659.71 5,589.41 -3,394.62 5,986.82 0.00 5,807.91 9,900.00 66.07 119.47 5,700.27 5,629.97 -3,439.59 6,066.40 0.00 5,884.98 10,000.00 66.07 119.47 5,740.83 5,670.53 -3,484.56 6,145.97 0.00 5,962.04 10,100.00 66.07 119.47 5,781.39 5,711.09 -3,529.53 6,225.55 0.00 6,039.11 10,200.00 66.07 119.47 5,821.95 5,751.65 -3,574.50 6,305.13 0.00 6,116.18 10,300.00 66.07 119.47 5,862.51 5,792.21 -3,619.47 6,384.71 0.00 6,193.24 2/3/2017 3:26:06PM Page 6 COMPASS 5000.1 Build 74 SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Plan:CD5-17 Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Project: Western North Slope MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan:CD5-17 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD5-17 Design: CD5-17wp09 Planned Survey 0-070-0,0001100,0;:00000"000„0-00410 Measured Vertical Depth Inclination Azimuth Depth TVDss +N/-S +E/-W DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) 5,821.40 10,371.97 66.07 119.47 5,891.70 5,821.40 -3,651.83 6,441.98 0.00 6,248.70 Albian 96 10,400.00 66.07 119.47 5,903.07 5,832.77 -3,664.44 6,464.29 0.00 6,270.31 10,500.00 66.07 119.47 5,943.63 5,873.33 -3,709.41 6,543.86 0.00 6,347.37 10,600.00 66.07 119.47 5,984.19 5,913.89 -3,754.38 6,623.44 0.00 6,424.44 10,700.00 66.07 119.47 6,024.75 5,954.45 -3,799.35 6,703.02 0.00 6,501.50 10,800.00 66.07 119.47 6,065.31 5,995.01 -3,844.32 6,782.60 0.00 6,578.57 10,900.00 66.07 119.47 6,105.87 6,035.57 -3,889.29 6,862.17 0.00 6,655.63 11,000.00 66.07 119.47 6,146.43 6,076.13 -3,934.26 6,941.75 0.00 6,732.70 11,100.00 66.07 119.47 6,186.99 6,116.69 -3,979.23 7,021.33 0.00 6,809.76 11,200.00 66.07 119.47 6,227.55 6,157.25 -4,024.20 7,100.91 0.00 6,886.83 11,300.00 66.07 119.47 6,268.11 6,197.81 -4,069.17 7,180.48 0.00 6,963.90 11,400.00 66.07 119.47 6,308.67 6,238.37 -4,114.14 7,260.06 0.00 7,040.96 11,500.00 66.07 119.47 6,349.23 6,278.93 -4,159.11 7,339.64 0.00 7,118.03 11,600.00 66.07 119.47 6,389.79 6,319.49 -4,204.08 7,419.22 0.00 7,195.09 11,700.00 66.07 119.47 6,430.35 6,360.05 -4,249.05 7,498.79 0.00 7,272.16 11,800.00 66.07 119.47 6,470.91 6,400.61 -4,294.02 7,578.37 0.00 7,349.22 11,900.00 66.07 119.47 6,511.47 6,441.17 -4,338.99 7,657.95 0.00 7,426.29 12,000.00 66.07 119.47 6,552.03 6,481.73 -4,383.96 7,737.53 0.00 7,503.35 12,100.00 66.07 119.47 6,592.59 6,522.29 -4,428.93 7,817.11 0.00 7,580.42 12,200.00 66.07 119.47 6,633.15 6,562.85 -4,473.90 7,896.68 0.00 7,657.49 12,300.00 66.07 119.47 6,673.71 6,603.41 -4,518.87 7,976.26 0.00 7,734.55 12,400.00 66.07 119.47 6,714.27 6,643.97 -4,563.84 8,055.84 0.00 7,811.62 12,500.00 66.07 119.47 6,754.83 6,684.53 -4,608.81 8,135.42 0.00 7,888.68 12,600.00 66.07 119.47 6,795.39 6,725.09 -4,653.78 8,214.99 0.00 7,965.75 12,700.00 66.07 119.47 6,835.95 6,765.65 -4,698.75 8,294.57 0.00 8,042.81 12,800.00 66.07 119.47 6,876.51 6,806.21 -4,743.72 8,374.15 0.00 8,119.88 12,900.00 66.07 119.47 6,917.07 6,846.77 -4,788.69 8,453.73 0.00 8,196.94 13,000.00 66.07 119.47 6,957.63 6,887.33 -4,833.66 8,533.30 0.00 8,274.01 13,100.00 66.07 119.47 6,998.19 6,927.89 -4,878.63 8,612.88 0.00 8,351.07 13,166.35 66.07 119.47 7,025.10 6,954.80 -4,908.46 8,665.68 0.00 8,402.21 FCS Top 13,200.00 66.07 119.47 7,038.75 6,968.45 -4,923.60 8,692.46 0.00 8,428.14 13,300.00 66.07 119.47 7,079.31 7,009.01 -4,968.57 8,772.04 0.00 8,505.21 13,400.00 66.07 119.47 7,119.87 7,049.57 -5,013.54 8,851.62 0.00 8,582.27 13,467.24 66.07 119.47 7,147.14 7,076.84 -5,043.77 8,905.12 0.00 8,634.09 Start 3°/100'DLS,67.23°TF,for 1233.58' 000, 13,500.00 66.45 120.46 7,160.33 7,090.03 -5,058.75 8,931.10 3.00 8,659.51 13,560.90 67.18 122.28 7,184.30 7,114.00 -5,087.89 8,978.90 3.00 8,707.68 Kalubik 13,600.00 67.66 123.44 7,199.31 7,129.01 -5,107.49 9,009.22 3.00 8,739.22 13,700.00 68.93 126.37 7,236.30 7,166.00 -5,160.65 9,085.40 3.00 8,821.92 13,800.00 70.24 129.25 7,271.20 7,200.90 -5,218.11 9,159.42 3.00 8,907.40 13,882.38 71.35 131.59 7,298.30 7,228.00 -5,268.55 9,218.64 3.00 8,979.74 Kuparuk C 2/3/2017 3:26:06PM Page 7 COMPASS 5000.1 Build 74 i • SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Plan:CD5-17 Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Project: Western North Slope MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan:CD5-17 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD5-17 Design: CD5-17wp09 Planned Survey Measured Vertical Depth Inclination Azimuth Depth TVDss +N/-S +E/-W DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) 7,232.00 13,894.95 71.52 131.94 7,302.30 7,232.00 -5,276.48 9,227.53 3.00 8,990.92 LCU 13,900.00 71.59 132.08 7,303.90 7,233.60 -5,279.69 9,231.09 3.00 8,995.42 14,000.00 72.99 134.87 7,334.32 7,264.02 -5,345.23 9,300.20 3.00 9,085.74 14,100.00 74.43 137.61 7,362.37 7,292.07 -5,414.55 9,366.57 3.00 9,178.10 14,200.00 75.90 140.32 7,387.99 7,317.69 -5,487.46 9,430.02 3.00 9,272.27 14,300.00 77.39 142.99 7,411.09 7,340.79 -5,563.76 9,490.37 3.00 9,367.97 14,400.00 78.92 145.63 7,431.61 7,361.31 -5,643.24 9,547.46 3.00 9,464.95 14,500.00 80.47 148.24 7,449.51 7,379.21 -5,725.69 9,601.13 3.00 9,562.94 14,600.00 82.03 150.83 7,464.72 7,394.42 -5,810.88 9,651.22 3.00 9,661.67 14,700.00 83.62 153.40 7,477.21 7,406.91 -5,898.56 9,697.62 3.00 9,760.88 14,700.82 83.63 153.42 7,477.30 7,407.00 -5,899.29 9,697.98 3.00 9,761.69 Hold for 225.33' 14,790.95 83.63 153.42 7,487.30 7,417.00 -5,979.40 9,738.06 0.00 9,851.24 Alpine C 14,800.00 83.63 153.42 7,488.30 7,418.00 -5,987.44 9,742.09 0.00 9,860.23 14,817.99 83.63 153.42 7,490.30 7,420.00 -6,003.43 9,750.09 0.00 9,878.10 UJU 14,900.00 83.63 153.42 7,499.40 7,429.10 -6,076.32 9,786.56 0.00 9,959.58 14,926.15 83.63 153.42 7,502.30 7,432.00 -6,099.56 9,798.18 0.00 9,985.56 CD5-17L1 TOW 14,926.47 83.63 153.42 7,502.34 7,432.04 -6,099.85 9,798.33 1.00 9,985.88 Start 1°/100'DLS,-74.88°TF,for 0.32' 15,000.00 83.63 153.42 7,510.49 7,440.19 -6,165.20 9,831.03 0.00 10,058.94 15,100.00 83.63 153.42 7,521.59 7,451.29 -6,254.07 9,875.50 0.00 10,158.29 15,200.00 83.63 153.42 7,532.68 7,462.38 -6,342.95 9,919.98 0.00 10,257.64 15,300.00 83.63 153.42 7,543.77 7,473.47 -6,431.83 9,964.45 0.00 10,356.99 15,400.00 83.63 153.42 7,554.87 7,484.57 -6,520.70 10,008.92 0.00 10,456.35 15,500.00 83.63 153.42 7,565.96 7,495.66 -6,609.58 10,053.40 0.00 10,555.70 15,600.00 83.63 153.42 7,577.05 7,506.75 -6,698.46 10,097.87 0.00 10,655.05 15,700.00 83.63 153.42 7,588 15 7,517.85 -6,787.33 10,142.34 0.00 10,754.40 15,714.49 83.63 153.42 7,589.75 7,519.45 -6,800.21 10,148.79 0.00 10,768.80 Hold for 788.02' 15,800.00 85.77 152.00 7,597.65 7,527.35 -6,875.87 10,187.83 3.00 10,853.93 15,809.06 86.00 151.85 7,598.30 7,528.00 -6,883.85 10,192.08 3.00 10,862.97 Start 3°/100'DLS,-33.46°TF,for 94.57'-Alpine A-7-5/8"X 9-7/8"by 11" 15,829.06 86.00 151.85 7,599.70 7,529.40 -6,901.44 10,201.49 0.00 10,882.92 Hold for 20' 15,900.00 88.13 151.85 7,603.33 7,533.03 -6,963.90 10,234.92 3.00 10,953.76 15,943.89 89.44 151.85 7,604.26 7,533.96 -7,002.59 10,255.62 3.00 10,997.64 Start 3°/100'DLS,0°TF,for 114.82' 16,000.00 89.44 151.85 7,604.80 7,534.50 -7,052.06 10,282.09 0.00 11,053.75 16,100.00 89.44 151.85 7,605.77 7,535.47 -7,140.23 10,329.27 0.00 11,153.74 16,200.00 89.44 151.85 7,606.74 7,536.44 -7,228.39 10,376.44 0.00 11,253.74 16,300.00 89.44 151.85 7,607.71 7,537.41 -7,316.56 10,423.62 0.00 11,353.73 2/3/2017 3:26:06PM Page 8 COMPASS 5000.1 Build 74 • • SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Plan:CD5-17 h' Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Project: Western North Slope MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) I' Site: CD5 Alpine West Pad North Reference: True il Well: Plan:CD5-17 Survey Calculation Method: Minimum Curvature ,I Wellbore: Plan:CD5-17 Design: CD5-17wp09 Planned Survey Measured Vertical Depth Inclination Azimuth Depth TVDss +N/-S +El-W DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) 7,538.38 16,400.00 89.44 151.85 7,608.68 7,538.38 -7,404.73 10,470.80 0.00 11,453.73 16,500.00 89.44 151.85 7,609.65 7,539.35 -7,492.89 10,517.97 0.00 11,553.72 16,600.00 89.44 151.85 7,610.62 7,540.32 -7,581.06 10,565.15 0.00 11,653.72 16,700.00 89.44 151.85 7,611.59 7,541.29 -7,669.23 10,612.33 0.00 11,753.71 16,800.00 89.44 151.85 7,612.55 7,542.25 -7,757.39 10,659.50 0.00 11,853.71 16,900.00 89.44 151.85 7,613.52 7,543.22 -7,845.56 10,706.68 0.00 11,953.70 17,000.00 89.44 151.85 7,614.49 7,544.19 -7,933.73 10,753.86 0.00 12,053.70 17,100.00 89.44 151.85 7,615.46 7,545.16 -8,021.89 10,801.04 0.00 12,153.69 17,200.00 89.44 151.85 7,616.43 7,546.13 -8,110.06 10,848.21 0.00 12,253.69 17,300.00 89.44 151.85 7,617.40 7,547.10 -8,198.23 10,895.39 0.00 12,353.68 17,400.00 89.44 151.85 7,618.37 7,548.07 -8,286.39 10,942.57 0.00 12,453.68 17,500.00 89.44 151.85 7,619.34 7,549.04 -8,374.56 10,989.74 0.00 12,553.67 17,600.00 89.44 151.85 7,620.31 7,550.01 -8,462.73 11,036.92 0.00 12,653.67 17,700.00 89.44 151.85 7,621.28 7,550.98 -8,550.89 11,084.10 0.00 12,753.66 17,800.00 89.44 151.85 7,622.25 7,551.95 -8,639.06 11,131.27 0.00 12,853.66 17,900.00 89.44 151.85 7,623.22 7,552.92 -8,727.23 11,178.45 0.00 12,953.65 18,000.00 89.44 151.85 7,624.18 7,553.88 -8,815.39 11,225.63 0.00 13,053.65 18,100.00 89.44 151.85 7,625.15 7,554.85 -8,903.56 11,272.81 0.00 13,153.64 18,200.00 89.44 151.85 7,626.12 7,555.82 -8,991.73 11,319.98 0.00 13,253.64 18,300.00 89.44 151.85 7,627.09 7,556.79 -9,079.90 11,367.16 0.00 13,353.63 18,400.00 89.44 151.85 7,628.06 7,557.76 -9,168.06 11,414.34 0.00 13,453.63 18,500.00 89.44 151.85 7,629.03 7,558.73 -9,256.23 11,461.51 0.00 13,553.62 18,600.00 89.44 151.85 7,630.00 7,559.70 -9,344.40 11,508.69 0.00 13,653.61 18,700.00 89.44 151.85 7,630.97 7,560.67 -9,432.56 11,555.87 0.00 13,753.61 18,800.00 89.44 151.85 7,631.94 7,561.64 -9,520.73 11,603.04 0.00 13,853.60 18,900.00 89.44 151.85 7,632.91 7,562.61 -9,608.90 11,650.22 0.00 13,953.60 19,000.00 89.44 151.85 7,633.88 7,563.58 -9,697.06 11,697.40 0.00 14,053.59 19,100.00 89.44 151.85 7,634.85 7,564.55 -9,785.23 11,744.58 0.00 14,153.59 19,200.00 89.44 151.85 7,635.81 7,565.51 -9,873.40 11,791.75 0.00 14,253.58 19,300.00 89.44 151.85 7,636.78 7,566.48 -9,961.56 11,838.93 0.00 14,353.58 19,400.00 89.44 151.85 7,637.75 7,567.45 -10,049.73 11,886.11 0.00 14,453.57 19,500.00 89.44 151.85 7,638.72 7,568.42 -10,137.90 11,933.28 0.00 14,553.57 19,600.00 89.44 151.85 7,639.69 7,569.39 -10,226.06 11,980.46 0.00 14,653.56 19,700.00 89.44 151.85 7,640.66 7,570.36 -10,314.23 12,027.64 0.00 14,753.56 19,800.00 89.44 151.85 7,641.63 7,571.33 -10,402.40 12,074.82 0.00 14,853.55 19,900.00 89.44 151.85 7,642.60 7,572.30 -10,490.56 12,121.99 0.00 14,953.55 20,000.00 89.44 151.85 7,643.57 7,573.27 -10,578.73 12,169.17 0.00 15,053.54 20,100.00 89.44 151.85 7,644.54 7,574.24 -10,666.90 12,216.35 0.00 15,153.54 20,200.00 89.44 151.85 7,645.51 7,575.21 -10,755.07 12,263.52 0.00 15,253.53 20,300.00 89.44 151.85 7,646.48 7,576.18 -10,843.23 12,310.70 0.00 15,353.53 20,400.00 89.44 151.85 7,647.44 7,577.14 -10,931.40 12,357.88 0.00 15,453.52 20,500.00 89.44 151.85 7,648.41 7,578.11 -11,019.57 12,405.05 0.00 15,553.52 20,600.00 89.44 151.85 7,649.38 7,579.08 -11,107.73 12,452.23 0.00 15,653.51 20,700.00 89.44 151.85 7,650.35 7,580.05 -11,195.90 12,499.41 0.00 15,753.51 20,800.00 89.44 151.85 7,651.32 7,581.02 -11,284.07 12,546.59 0.00 15,853.50 2/3/2017 3:26:06PM Page 9 COMPASS 5000.1 Build 74 0 • SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Plan:CD5-17 Company: ConocoPhillips(Alaska)Inc.-WNS ND Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Project: Western North Slope MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan:CD5-17 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD5-17 Design: CD5-17wp09 Planned Survey I,II II Measured Vertical Depth Inclination Azimuth Depth TVDss +N/-S +E/-W DLS Vert Section (usft) (0) (I) (usft) usft (usft) (usft) 7,581.99 20,900.00 89.44 151.85 7,652.29 7,581.99 -11,372.23 12,593.76 0.00 15,953.50 21,000.00 89.44 151.85 7,653.26 7,582.96 -11,460.40 12,640.94 0.00 16,053.49 21,100.00 89.44 151.85 7,654.23 7,583.93 -11,548.57 12,688.12 0.00 16,153.49 21,200.00 89.44 151.85 7,655.20 7,584.90 -11,636.73 12,735.29 0.00 16,253.48 21,300.00 89.44 151.85 7,656.17 7,585.87 -11,724.90 12,782.47 0.00 16,353.48 21,400.00 89.44 151.85 7,657.14 7,586.84 -11,813.07 12,829.65 0.00 16,453.47 21,500.00 89.44 151.85 7,658.10 7,587.80 -11,901.23 12,876.82 0.00 16,553.47 21,600.00 89.44 151.85 7,659.07 7,588.77 -11,989.40 12,924.00 0.00 16,653.46 21,700.00 89.44 151.85 7,660.04 7,589.74 -12,077.57 12,971.18 0.00 16,753.46 21,800.00 89.44 151.85 7,661.01 7,590.71 -12,165.73 13,018.36 0.00 16,853.45 21,900.00 89.44 151.85 7,661.98 7,591.68 -12,253.90 13,065.53 0.00 16,953.45 22,000.00 89.44 151.85 7,662.95 7,592.65 -12,342.07 13,112.71 0.00 17,053.44 22,100.00 89.44 151.85 7,663.92 7,593.62 -12,430.23 13,159.89 0.00 17,153.44 22,200.00 89.44 151.85 7,664.89 7,594.59 -12,518.40 13,207.06 0.00 17,253.43 22,300.00 89.44 151.85 7,665.86 7,595.56 -12,606.57 13,254.24 0.00 17,353.43 22,400.00 89.44 151.85 7,666.83 7,596.53 -12,694.74 13,301.42 0.00 17,453.42 22,500.00 89.44 151.85 7,667.80 7,597.50 -12,782.90 13,348.60 0.00 17,553.42 22,600.00 89.44 151.85 7,668.77 7,598.47 -12,871.07 13,395.77 0.00 17,653.41 22,700.00 89.44 151.85 7,669.73 7,599.43 -12,959.24 13,442.95 0.00 17,753.41 22,800.00 89.44 151.85 7,670.70 7,600.40 -13,047.40 13,490.13 0.00 17,853.40 22,900.00 89.44 151.85 7,671.67 7,601.37 -13,135.57 13,537.30 0.00 17,953.40 23,000.00 89.44 151.85 7,672.64 7,602.34 -13,223.74 13,584.48 0.00 18,053.39 23,100.00 89.44 151.85 7,673.61 7,603.31 -13,311.90 13,631.66 0.00 18,153.39 23,200.00 89.44 151.85 7,674.58 7,604.28 -13,400.07 13,678.83 0.00 18,253.38 23,300.00 89.44 151.85 7,675.55 7,605.25 -13,488.24 13,726.01 0.00 18,353.38 23,400.00 89.44 151.85 7,676.52 7,606.22 -13,576.40 13,773.19 0.00 18,453.37 23,500.00 89.44 151.85 7,677.49 7,607.19 -13,664.57 13,820.37 0.00 18,553.37 23,600.00 89.44 151.85 7,678.46 7,608.16 -13,752.74 13,867.54 0.00 18,653.36 23,700.00 89.44 151.85 7,679.43 7,609.13 -13,840.90 13,914.72 0.00 18,753.36 23,800.00 89.44 151.85 7,680.40 7,610.10 -13,929.07 13,961.90 0.00 18,853.35 23,900.00 89.44 151.85 7,681.36 7,611.06 -14,017.24 14,009.07 0.00 18,953.35 24,000.00 89.44 151.85 7,682.33 7,612.03 -14,105.40 14,056.25 0.00 19,053.34 24,100.00 89.44 151.85 7,683.30 7,613.00 -14,193.57 14,103.43 0.00 19,153.34 24,200.00 89.44 151.85 7,684.27 7,613.97 -14,281.74 14,150.60 0.00 19,253.33 24,300.00 89.44 151.85 7,685.24 7,614.94 -14,369.90 14,197.78 0.00 19,353.33 24,400.00 89.44 151.85 7,686.21 7,615.91 -14,458.07 14,244.96 0.00 19,453.32 24,500.00 89.44 151.85 7,687.18 7,616.88 -14,546.24 14,292.14 0.00 19,553.32 24,600.00 89.44 151.85 7,688.15 7,617.85 -14,634.41 14,339.31 0.00 19,653.31 24,700.00 89.44 151.85 7,689.12 7,618.82 -14,722.57 14,386.49 0.00 19,753.31 24,800.00 89.44 151.85 7,690.09 7,619.79 -14,810.74 14,433.67 0.00 19,853.30 24,900.00 89.44 151.85 7,691.06 7,620.76 -14,898.91 14,480.84 0.00 19,953.30 25,000.00 89.44 151.85 7,692.03 7,621.73 -14,987.07 14,528.02 0.00 20,053.29 25,100.00 89.44 151.85 7,692.99 7,622.69 -15,075.24 14,575.20 0.00 20,153.29 25,200.00 89.44 151.85 7,693.96 7,623.66 -15,163.41 14,622.37 0.00 20,253.28 25,300.00 89.44 151.85 7,694.93 7,624.63 -15,251.57 14,669.55 0.00 20,353.28 2/3/2017 3:26:06PM Page 10 COMPASS 5000.1 Build 74 SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Plan:CD5-17 Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Project: Western North Slope MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan:CD5-17 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD5-17 Design: CD5-17wp09 Planned Survey Measured Vertical Depth Inclination Azimuth Depth TVDss +N/-S +E/-W DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) 7,625.60 hi 25,400.00 89.44 151.85 7,695.90 7,625.60 -15,339.74 14,716.73 0.00 20,453.27 25,500.00 89.44 151.85 7,696.87 7,626.57 -15,427.91 14,763.91 0.00 20,553.27 25,600.00 89.44 151.85 7,697.84 7,627.54 -15,516.07 14,811.08 0.00 20,653.26 25,700.00 89.44 151.85 7,698.81 7,628.51 -15,604.24 14,858.26 0.00 20,753.26 25,800.00 89.44 151.85 7,699.78 7,629.48 -15,692.41 14,905.44 0.00 20,853.25 25,900.00 89.44 151.85 7,700.75 7,630.45 -15,780.57 14,952.61 0.00 20,953.25 26,000.00 89.44 151.85 7,701.72 7,631.42 -15,868.74 14,999.79 0.00 21,053.24 26,100.00 89.44 151.85 7,702.69 7,632.39 -15,956.91 15,046.97 0.00 21,153.24 26,200.00 89.44 151.85 7,703.66 7,633.36 -16,045.07 15,094.15 0.00 21,253.23 26,300.00 89.44 151.85 7,704.62 7,634.32 -16,133.24 15,141.32 0.00 21,353.23 26,400.00 89.44 151.85 7,705.59 7,635.29 -16,221.41 15,188.50 0.00 21,453.22 26,500.00 89.44 151.85 7,706.56 7,636.26 -16,309.57 15,235.68 0.00 21,553.22 26,600.00 89.44 151.85 7,707.53 7,637.23 -16,397.74 15,282.85 0.00 21,653.21 26,700.00 89.44 151.85 7,708.50 7,638.20 -16,485.91 15,330.03 0.00 21,753.21 26,800.00 89.44 151.85 7,709.47 7,639.17 -16,574.08 15,377.21 0.00 21,853.20 26,900.00 89.44 151.85 7,710.44 7,640.14 -16,662.24 15,424.38 0.00 21,953.20 27,000.00 89.44 151.85 7,711.41 7,641.11 -16,750.41 15,471.56 0.00 22,053.19 27,100.00 89.44 151.85 7,712.38 7,642.08 -16,838.58 15,518.74 0.00 22,153.19 89.44151.85 7 643.00 -16 922.50 15 563.64 0.00 22 27,195.19 ,248.37 Hold for 11251.3' 2/3/2017 3:26:06PM Page 11 COMPASS 5000.1 Build 74 • • SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Plan:CD5-17 Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Project: Western North Slope MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan:CD5-17 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD5-17 Design: CD5-17wp09 J""ttktg0,:, Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W -Shape (°) (°) (usft) (usft) (usft) CD5-17 02.Toe 011117 DK 0.00 0.00 7,713.30 -16,922.50 15,563.64 -plan hits target center -Circle(radius 100.00) CD5-17 Polygon 092216 BP 0.00 0.00 7,688.30 -6,144.43 9,708.80 -plan misses target center by 210.16usft at 14946.91 usft MD(7504.60 TVD,-6118.01 N,9807.42 E) -Polygon Point 1 7,688.30 0.00 0.00 Point 2 7,688.30 -786.67 394.94 Point 3 7,688.30 -8,722.64 4,641.89 Point 4 7,688.30 -10,825.23 5,767.10 Point 5 7,688.30 -10,730.86 5,943.45 Point 6 7,688.30 -8,628.27 4,818.24 Point 7 7,688.30 -692.71 571.52 Point 8 7,688.30 89.74 178.76 C05-06D 02.Toe 041416 JD 0.00 0.00 7,688.30 -14,819.89 14,438.87 -plan misses target center by 1.91 usft at 24810.50usft MD(7690.19 TVD,-14820.00 N,14438.62 E) -Circle(radius 100.00) CD5-06D 01.Heel 041416 JD 0.00 0.00 7,592.30 -6,884.12 10,192.04 -plan misses target center by 6.00usft at 15808.85usft MD(7598.29 TVD,-6883.66 N,10191.98 E) -Circle(radius 100.00) CD5-06D 00.AIpCKO 041916 JD 0.00 0.00 7,474.30 -6,099.56 9,798.18 -plan misses target center by 27.83usft at 14923.04usft MD(7501.96 TVD,-6096.80 N,9796.80 E) -Circle(radius 100.00) CD5-17 00.L1TOW 011117 DK 0.00 0.00 7,502.30 -6,099.56 9,798.18 -plan hits target center -Circle(radius 100.00) CD5-17 01.Heel 011117 DK 0.00 0.00 7,598.30 -6,883.85 10,192.08 -plan hits target center -Circle(radius 100.00) Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter s (usft) (usft) Name. O O � 115.30 115.30 20"x 42" 20 42 27,195.19 7,713.30 4-1/2"x 6-3/4" 4-1/2 6-3/4 15,809.06 7,598.30 7-5/8"X 9-7/8"by 11" 7-5/8 11 2,224.15 2,185.30 10-3/4"x 13-1/2" 10-3/4 13-1/2 2/3/2017 3:26:06PM Page 12 COMPASS 5000.1 Build 74 • • SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Plan:CD5-17 Company: ConocoPhillips(Alaska)Inc.-WNS TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Project: Western North Slope MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan:CD5-17 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD5-17 Design: CD5-17wp09 Formations Measured Vertical Vertical Dip Depth Depth Depth SS Dip Direction (usft) (usft) Name Lithology (1 (°) 1,322.61 1,320.30 Base Permafrost 0.00 15,809.06 7,598.30 Alpine A 7,728.47 4,819.50 Albian 97 5,966.14 4,104.70 K-2 Base 13,894.95 7,302.30 LCU 10,371.97 5,891.70 Albian 96 14,926.15 7,502.30 CD5-17L1 TOW 5,802.43 4,038.30 K-2 14,790.95 7,487.30 Alpine C 13,560.90 7,184.30 Kalubik 3,063.15 2,854.30 C-10 0.00 14,817.99 7,490.30 UJU 5,228.21 3,805.40 K-3 0.00 13,882.38 7,298.30 Kuparuk C 2,375.58 2,321.10 C-30 0.00 13,166.35 7,025.10 FCS Top Plan Annotations Measured Vertical Local Coordinates � Depth Depth +N/-S +E/-W e- 1, ?'14 k,, ,0 ,1H. (usft) (usft) (usft) (usft) Comment - ° v 500.00 500.00 0.00 0.00 KOP.Start 1.5°/100'DLS,10°TF,for 100.01' 600.01 600.00 1.29 0.23 Start 2°/100'DLS,0°TF,for 150.22' 750.23 750.00 9.04 1.59 Adjust TF to 140°,for 521.93' 1,272.17 1,270.30 8.23 32.40 Hold for 100.88' 1,373.04 1,370.30 0.12 42.90 Start 2°/100'DLS,-7.82°TF,for 851.1' 2,224.15 2,185.30 -129.17 238.15 Hold for 20' 2,244.15 2,203.49 -133.59 245.18 Start 3°/100'DLS,-3.74°TF,for 1385.92' 3,630.07 3,157.19 -620.01 1,076.93 Hold for 9837.17' 13,467.24 7,147.14 -5,043.77 8,905.12 Start 3°/100'DLS,67.23°TF,for 1233.58' 14,700.82 7,477.30 -5,899.29 9,697.98 Hold for 225.33' 14,926.47 7,502.34 -6,099.85 9,798.33 Start 1°/100'DLS,-74.88°TF,for 0.32' 15,714.49 7,589.75 -6,800.21 10,148.79 Hold for 788.02' 15,809.06 7,598.30 -6,883.85 10,192.08 Start 3°/100'DLS,-33.46°TF,for 94.57' 15,829.06 7,599.70 -6,901.44 10,201.49 Hold for 20' 15,943.89 7,604.26 -7,002.59 10,255.62 Start 3°/100'DLS,0°TF,for 114.82' 27,195.19 7,713.30 -16,922.50 15,563.64 Hold for 11251.3' 2/3/2017 3:26:06PM Page 13 COMPASS 5000.1 Build 74 • • CD L Cr CD L.. Ish i '- r CO x "! r/ a m Z c n c 1 o 2 U c ii16 0as 5 CL 0 c- a(1,• 0 c a 1.)0 E �/ y oas 3 = a Q d a LL_^. ■— = U• a v D o aao U a M ■. I_ S o a O N© ° " E YIC.) •- T x • aL. M t2 = d r J O L N- ti C a = O a Q M N '; ¢ a m o OL pm NZ c in in fp- 0 a 'Qo o V L 'V+ c Zi d N„ • dLQUU x ti co •— ' Q t • m o Lcma e 0 2 ) O 4”' .o m c a a s CO III Ln v. C U T LL mU £ ap `1 Q 0 CG cc V < owi- ay m m o F mm5. c) a s in 0 i in u) 0 > in in fkalti _ --------- =' Iii . • o a. co MP Q C E0 0 - z 3 ct 0 C Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y y _y N 0 M N tll N N N N N N N N N N N N N N N N N) C/_) N • N O 'f:71') ,O O O (c+) O O O CL O O O ,O O O O O O O O cc O O. '(p 'C^p (0 N IO CU <0 CU N C6 C6 (0 CO (0 (0 N N <0 C6 (0 C(+3'' N (0 CO CU CU co C. N N Cl) N N N N N N N N N N y N co N N N N N N N N N N N N N N N N N N N N N Cl) N N N N N N N N N N , . IIIIII <0 CO CO CO N CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO C6 CQ N a a a a a a a a a a a a a CL a a a a a a a CL n. a 4 Or C 0 O U C a S a E ` ` ` ` ` 0 ` ` o ` 0 0 O o 0 m Vm V o V V 0 U V 1) U m 6 o (U 0 1) 0 0 0 U m E LLo mLLmILmmmLLm LLmmLL C m LL LL LL LL LL LL 1) 5 OU N O N U N N C) 0 N N N N N O N y N N N O NN N, 2 '02 '02 2 '0 '02 0 U Q U 6 U 6 U in U 6 C E CN CN NN C <00 CN N feat! CN dC 0N NC lN to O C(U aim N NN C N C NN Cl d N C N CU) N C) N N C) N N N N C) w N N N N N NN 0 W UUU 0 0 0 U 0 0 000000 00000 0[) u7 V NV' M •7 CO 0) n CO (O CO CO CO O N (O CO O O N N_ d N n _ CO V' CO 0O 0 0 N- N n N n CO n CO M 0) CO Cr N CO C CO O n 0 0) n V' M CO M CO N M 0 N- N 0 CO V' O ` y V' O co co CO co n n O M M V M V M N r O O 6) O) V N aa R r r r r r r r d 1.1- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 112 o o ui o ui ui o 0 1) ui o Cd ui Cd 6 6 Cd ui o Cd o h o ui • LCO CO n CO n n N O CO n 0 N- N n N N N N CO N CO N CO n y G C=" 1 V' co O) CO 0) V' n 0) 0 CO C) CO O) 0) 0 0) r 0) 0) CO CO Cl) 1) y = ID) r r O q2 p N V a` co CV OOuN V (O 4 CO M CO V' CO CV COCV' CO N O CO CO On- n O CO 03 N.: V n VM uW 0 N N CO 7 O V O O O O O O CO co co COCO CO VVO O O O n f` uV VV' N N n NNNNNN NNNNNN NNrrrr rr r r _w al .... N a NW OG NO criMOQ)CCO mDCO (0rM CONCO MC)rO nN C)CON OO NCON 0MM COCONV' O)MmM Cr OMM Cl)MVQ)OO NOf- mCM COCCOCO Ii0 N(CNQ d Q II .- - CJ n COV 6) M N M N V uO rir U E .- CC) C) 0) M N- V' V N CO CO M CO M V0 CO n CO n N 0 C O o o N N- 0 f� 0 N CO CO CO CO n V CO CO N M CO W u) E Ud 6 O O co O V 4 O •y = Ny• N o O O O n r CO CO M M C) 0) n M CO O M M 6) MMMMNN NNNNNN NN .- .- N- 03 rrrr CE o C N O O 5 0 Q. ` °' o o a a d N Q) C) coCOVM COM C) n CO CO(O CO N 0) V M ' O CO co r W a co co co M CO r N r r 0) CO N 0) N O N 0) C) 0 0 M CO 0 r 1 y^ y El r O CN C) CC N O C) n V C) M N M N V uO W M C6 V LOU • NC N C N VC)N VO(O COCO Q)u) Q1M nCO OCO OO COCO C)M COCO CM CM OM CM CDC' C)N C)A CON COu NM QWV WA0 ` KO r M .- 0 V wn •a 1 N 1.... o o m Z E •E 1 ._ L() o c Q o 'a C) T C i u) .0 O o) C c U a 3 d u) d u o _ c E 0 p d t d a u E R E I O ' O LL R 7.= U a w 2 ;0 0 3 NO NU (W y N N M M CO NN CO CO OO 0 lO .° N N 0 0 M M VV CO CO CO CO n N- CO CO C) C) 0 0 CO ON 00 O 0 OOOO COCOOO O O O O r r e X Q m E E DU U U w 0 0 c0j 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.6 r� o U, 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C O. 13 N ? CO N N N d C ' < < i C C C i i C i = = i i C i i i i i N M CO M N N N N M M 4 4 (O CO CO Co CO co n n CO CO co O) 0 O O tE U o m ° d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o r r 6 C m 3 a 0 0 0 d n n n n n u) ( n n v) n n n n n v) n n v) n n v) v) o O C o N C 7 C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 •_N Z •w p y y y C U U U 'a 0 0 0 0 0 0 0 0 0 0 0 0 U U U U U U 0 0 0 0 0 a a CI d y . co Z N N N Q N N N N M M V V CO CO CO CO CO CO n n CO CO O) 0) 0 0 IL .O C rn O. M M M O 9 O O O O 0 0 0 0 O O O O 0 0 0 0 0 O r r 7 co V U N W C) E V 7 7 U' 6 (n (f) (5 6 6 (() CO Cn Cn CO CO (() CO Cn V) Cn Cn (() 1f) C() (n Cn O '' r O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U m Ce re C.) 000U c) c) c) Uc� c� c� c� cpc> c> () c� c� cicicic) 00000 c c co U > d < E N U V F d' N CO • z o 2 1 CAZ _ o ., 0 3 � C+ C Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N N N N N N 0 0 0 N N N N 0) N N N N N N N N N N N N N N rn I)y Ct W W ce cC CC EC c[ cY re cr lY cC c[ rt W CC CC CC CC CC CC CC CC O O O O O O O O O O O O O O O O O O O O O O O O O O O O 3 a m 'm 'm 'm 'm m m m m m 'm m m 'm 'm m .� m 'm 'm m 'm 'm m 'm m 'm m N C. N N N N N N N N N N N N N N N N N N N N N N Cl) N N N N N N N N N N N Cl) N Cl) N CO y y N N N N CO CO CO CO CO CO N N N N CO R R R CO R R R CO R CO R R R R CO CO R R (6 R R CO R R R R R R CL a a a a a a a a a a a a a a a a a a a a a a a s a s a 4 200 O c U O O a C w E `o O co ° ( ` u ( C ( u ( ` Co C ` 8 ( ( II ( u U m E ( CR( CR CCC (p CC ( C ( C (pCCC co u_ R a ta R a R LL R a R LL R a R a R a g a R a LL R aC) .nC) . N N C) !� C) !� N N C) !' N N N N C) y N N N N !, C) U ❑ U ❑ U pU ❑ U ❑ 0 ❑ U ❑ U ❑ U ❑ U ❑ U ❑ U c) o ()C C C C C C C C C C C C C C E R N R C) R C) R (1) R C) R (1) RC) RC) R C) R (1) RC) R R i) R• R C R C Ry NNa) NC)UUU UU UUUUUU UUUUUU UUUUUU 00 0 N- r V CO (O CO O N CO C) 1- C) N- C) O CO O M O N- O n CO r CO (WO O CO ti; V1- CO C) CO C) CO r OM 0 CO CO 1- V V 03 CO CO CO CO (O (OM ,- NCO CO (0O V _ N- r O O O O O co. (O CO O CO CO CO CO R O V O O N r N r N (O O ui O N V V N N N N NNO c71z.,,-, N M CO ALLi .- 0 U 0 0 0 0 0 0 0 0 0 0 0 O O 0 0 0 0 0 0 0 0 0 0 O O O O o 'p 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O p 0 0 0 O O 0 o O 0, ci ui Lri ui ui ui (f'i ui ui u) ui ui ui u7 dud r1v6 6 O N uu (i O u) O g L " O N) 1O N N N N r N- N� r Nr N- r O NOO O N N ON O N0) N ON N ON O V V V 2 y 2 r r VV p2 CI a V CO CO CO O CO O O CO N CO N M N CO CO r O) O) O ON CO C CO CO CO CO CO CO CO V O) O CO. O CO V COCOCOCO(O ( ) I- r 1- CO N- COM CO(O CO CO COCOCOl jO O O O O 6O W M u) N N O O V V V V (O (O (O O) (O O) V O) V - CO CO r r N- COV V r r CO CO CO CO CO C 17, IM M M r M W a— ) N O -O 4r `O N-V V N- V O O MN O NM O Cm NN- O O (O O V N-O V rO p COr C M O L O F.'; cN-0 V V V V V V (NO (ON- (N (r M N1 M VV M W MO) (O Ci V OM V d (O O O r O yig co cr, M N- N- N. O CO CO CO p O O) NI- O V V V V Ra as g V o d A E r O O. n CO r CO (O r r M r M r (O O CO O O r_ 37- 3 r O r O CO n C CO P. O CO CO 1,9 O (O N O CO (O N N CO CO CO 3 CO CO N CO EV O h (O C7 O a0 O6 V V V V M M W 40 6W N N N O N O O) d) C) y O C O d) O) r N r N COCO N- N N- N- CO CO CO CO CO CO M M M ` M r.,-1.- M M co E t VC O O t co 12 CI °' a o 45a U) O N- N- N- V M- 00010 N- M O O N- CO O CO O 1- (O CO 00 O T n N 'O CO r CO V N V N O O N O N O CO CO O) CO O) CO V (O V r V r r r r y 2 .c (O O CO V V V V V V CO CO CO CO MN M CO M CO 6 CO OV 0) V O CO O C 2• WON 1- N N NNCOCO N1- NN n m N V N V M M co M co O N O to — NO. M C) CM N- 1N- N- N- CO CO CO CO CO W V V V V V Cl E12 v w m 0 gr r -1-- C.) Uw v .0 Ctio o ' 7 z E Et to „ ” Uoa U • c . _I co,, .. .,, , ., 2 .c) Q) d) co C CO U y V CA a) -0 a a W W a CC c O of CD 3 3 co m 3 C R 'O r L J J O O J 0. ▪ a % E '� 3 3 rn mO m m EIS °) r) LALU v 2 y z 0cR W O as a s L.J . J Un 'AI '71. (() U aC ` M_ h O (O J 0 � E a CO ( M (h Q Q U U CU CLI 4. Acoco Q V CO(O CON CO CO O Cr) ( i CO QO• 7U• d c0 M Q 0 O O) � 41 O 41 N N m co 0U U U . A 'c r 2 N N ❑ ❑ ❑ ❑ ❑ ❑ O rn n n OO (n n uun NEa "; ch U U us us U U _ U U U U LO 'o ❑ ❑ o ❑ ❑ ❑ ❑ LL •K QN 3 E 00000 ❑ ❑ O_ m ❑ ❑ UU (DUO () 0 O a U U U U U J U U Mi co' V V u)( Ni (O OO <i U 71 NC a Qm J r r r r r r QQQ Q C C C C C V w _ N N CO CO CO O M CO CO CO CO CO CO CO M M C) O) C) C) O Oa a a a a O L ,a r r N N a) 0 ui l'O , Lb uN O) O) a) CC) O) Z . E o IA (n (h (n (n a, CO ui (n ❑ ❑ o ❑ ❑ o ❑ ❑ ❑ ❑ ui (n (n v) CO v) rn O CO 0o po r c 000000 0 0 o U U U U U U U U 000000 o o r` r rn r mr _ Z 'y Cy N 2 U U U U U U U U , , U U U U U UCO Ul 5 ,O N y 'co E ( i ( ( ( i co co CO V V O O O (O i ( o ❑ ❑ o 0 N O ❑ w A r CO CO CO CO CO CO r co O C) m O O CD UUUU UU- C CD d pr r r r r r r CONMM MMMMMM MMC (i) Tc? OOco C.) ucm E us (n nn (n (n (n u; nn 5 us (n nn n C CCC C o U ` aaw O ❑ ❑ ❑ 0 000000000000 o ❑ ❑ ❑ ❑ ❑ ❑ O R R R R R _ ; to o 00000 000000 U U U U U U U U U U U U U U a a a a a 4,2 F3 gi Q 4 K y 43 • • z 0 up cn0, r r a 0 E 0 .. .7. 3 VS C C Y Y Y Y Y Y Y Y Y Y Y Y Y Y N N N N N N N N N N N N N N cn Y'. i t CC W W CC rY CC rt EC ce W CC CC RI 0 0 0 0 COa )0 'm 'm ')0 'm m 'm 'm 'm m 'm m 'm 'm m 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Qy N N N N N N N N N N N CI) N CO N co co N N co N N N N N N N N • CO O O 0 CO CO CO CO CO CO CO CO CO O LL a LL a a LL a a 0_ a LL a a a 4 O. O c u O a C a E o `o `o `o `o `o O 0 0 0 0 0 .:(5.. 0 0 o o 0 0 0 0 U r E CO LL O O IO LL CO03 C IN C CO N u_ IO CO LL 11 O N N 0) N N 0) N N 0) O N 0) E O C 0 0 C C 0 C 0 0 C C 0 C 0 0 0 E a.' N N 2_, N N N N N N N 2 °_' f0 (0 U O c m c c m m c m c C w m c <0 I- N N N (n N O N 0) O O 0) O 0) 0) OO O N T < < < 00000 000000 0 0 0 m 0 0 0 m M N- v (0 v (0 I� m m m m Y Y Y m O 0) CO 0) m o) m '7 0) m u) U Q Q Q U m V N O 0) N V N V co O m 0 O (9 d' & fl 0 66 ,- 46 s- .- ,- ,- C) 7 M O 7 0 LL LL LL 0 CO CO U' T T } N I.1- x 0 0 0 0 0 0 U } 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 U o o vi o 0 0 0 0 0 0 0 0 0 c L N. 0 0 CO (0 0 )0 0 (0 (0 0 0 )f) 0 N aN,, V V (0 r r V CO V m V 'C 'V 0 01 y 0 = 2 m co O N- 0) (0 CO 0) m '7 0) CO m O) C CO CO CO IN CO l0 CO (o CO N V' m S0 N 0 00) M M 7 N ( CO V 7 N .4- r3 (0 y O V LT, a m 0 O O O m 0) O CO O CO (s, CO O N CO a m CO a 0) N N 1.0 N 0 0) N O 0) 7 6 6 m V m O O) O) 6 O o) O O o1 C 0 12 L N- 0) 0) N V 0) 7 0) V (0 0) 0 In 0) O y a S' V CO V s. r M m M m M V M d Nu. v d d e C co (m0 (00 CO CO N 0 CO 0 CO W U0 CO W LO 0) m O m m 0) ,, QW i y E 01 m m m O C co 0) 0) V 7 N N (0 m )0 )0 m O C 3 O Q. •R 2 0 , °' O 0, 0 G 0) I'S co 0 O O 03 7 0 )0 0 (1) N CO 0 N CO N 0) a m m V 0) (0 N (0 N 0 0) N 0 CO 0) 0) 0) CO 0) 0) 0) 0) 0Oa 01 N LO a 10 G2 L 0 OO V m o) O aaO O Q . 0. 0. . O. _ 0. N- 0) 0) CON v 0) v 0) v )n 0) 0 `0 0) 3 3 3 3 3 3 3 3 CO W l30 d 7 V CO V r r CO CO CO CO CO V M N. n N- r N. r n p Vic? do — V d x U) (0 (0 (0U LI) LOL0 1 L▪ (e U U U U U U U U C 0 at • ? c E 0 0 0 (0 (0 CO m 0) 1 O) = 0 0 0 N- ,- 0 0 c- LO 2 c ci Q OW a 0 O O 0 0 0 N N 0 0 0) U N Q d O V O O N m M T r C 0 0 3 3 1-- T. N N M N Z at 0 L r Cf m 0_ a 0] m C y U y ((7 01 0. XX O O m m 0 0 C 0 0 3 V V O. d " M OU_ a C CO a w OOM M (13 c- am ` d y 8 J O3 d3 6 co JE OOOJ 000 L 0 0 0 0 m CO > 0 CO i O OMMU U N O CL CMM O ON- LO ) LC' N N 0 0 3m m 0 0 VV o) o) C O o0 O . O O <0 N NOO EwMMOONNOO 4.1 p a t C NU O O X X U U op ,:72O O U U UU0 2 O O N N CO CO id U U O Ommmm 0i Lt it 5 .- .- N N U) U) Qy 7 V j 0) N N yj N M M CO M J J ' O O • (p CI p C v O O V) V) LO LO csi NNN[ N uj DUO O O O � N E a 6 a0 01 0 V) N LL Ecc a °) NNNad Lo 000 o = 0 cc! - dd C COC m m o U 0 Li d aXX Q st VV mmmm0_ dLLLLLLZ • C O Q) CO CO r/ Z IT O N CO N M M M M M M 0 0 O O 0 N C N 0 y) (O (f) (0 N 0) i[) 6 0 u) N N N N N .Q N E 0 0 0 0 0 0000 <0 <0 0 ,0 <0 CO Q C 0 IT - Z 0. 00000 U U U U U U 000U U co V U C aC C C C C C C C C 0 j C O O r E (0 O CO CO O CO CO CO O CO O) O) O) O) �▪ + (') i wee (0 0 LL LL LL LL LL LL Cl_ 0_ 0_ CC Ir CC CC Ir C c il Q itfxm0 . I CA Di 's 0.1 U O 0 O V 0 u) m za R. • Es- 0) 9 O m Q Q a) ti co N 1 to N W CI c ' a 00 0 E a a I «i 3 aa) m cc 2 Q po a) a) 7 m m U U o g � E E U W Al OO a7 02 LZ CL O a) c .Q Cl O m ` 0 d o :g rnC T) 8 'C 2alaa) N a ww,A. a)) 2 C ` m Nc. LW 92 a1N N U N Oo- -o ) 0 WOU o 2 ,_ cmw . a)i a a) . U ov NN • c II N N J N E N `o .= aw 6` J QO _ N O o V Q � amUU L. N d? a) () O a) — mC 2 Y coO UIQ N W U i4 O O • . Ladder View CD5-17wp09 TheReference e Well isalongthe X-axis. Error Ellipses are the Sum of the Reference and Offset Well Errors. I'i 0 k7r,-.. N O G mom= u 1I P11�ill���ui 300 C .1t lik co a ILASId u) i 1 2 4 150 :A j411)41 ..® U 0 till C V U Equivelant Magnetic Distance - A 0 V V 0 4000 8000 12000 16000 20000 24000 28000 Displayed interval could be less than entire well:Measured Depth 36.30 To 27195.19 SURVEY PROGRAM CASING DETAILS Depth From Depth To Survey/Plan Tool TVD MD Name 36.30 400.00 CD5-17wp09 (Plan: CD5-17) INC 115.30 115.30 20"x 42" 36.30 1000.00 CD5-17wp09 (Plan: CD5-17) GYD-GC-SS 2185.30 2224.15 10-3/4" x 13-1/2" 1000.00 2000.00 CD5-17wp09 (Plan: CD5-17) MWD 7598.30 15809.06 7-5/8"X 9-7/8" by 11" 1000.00 2224.15 CD5-17wp09 (Plan: CD5-17) MWD+IFR-AK-CAZ-SC 7713.30 27195.19 4-1/2"x 6-3/4" 2224.15 3724.15 CD5-17wp09 (Plan: CD5-17) MWD 2224.15 15809.06 CD5-17wp09 (Plan: CD5-17) MWD+IFR-AK-CAZ-SC 15809.06 17309.06 CD5-17wp09 (Plan: CD5-17) MWD 15R(lg(16 27115 14 ('IIS-17wnf4 (Plan. CII'-171 MWII+IFR-AK-CA7-SC St T., LE�na m n 9 o ®co o c CLI V <e)00 0 o �.1I, , ��L 11 il -,_ -11, Nig y, ii o - ------------ I N - Equivelant Magnetic Distance / - - - - --- - - - - i 0 III I ..... '/1/ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1111 1 0 500 1000 1500 2000 2500 3000 3500 Partial Measured Depth Sb bUU CD5-17wp09 1111 MD Inc Azi TVD Dleg TFace Targ a 500 690 36.30 0.00 0.00 36.30 0.00 0.00 36.30 To 27195.19 500.00 0.00 0.00 500.00 0.00 0.00 690 870 600.01 1.50 10.00 600.00 1.50 10.00 750.23 4.50 10.00 750.00 2.00 0.00 870 1060 15:32,February 03 2017 1272.17 7.56 127.69 1270.30 2.00 140.00 1060 1240 1373.04 7.56 127.69 1370.30 0.00 0.00 CASING DETAILS 2224.15 24.53 122.19 2185.30 2.00 -7.82 1240 -- 1430 _ 2244.15 24.53 122.19 2203.49 0.00 0.00 TVD MD Name 3630.07 66.07 119.47 3157.19 3.00 -3.74 1430 1610 115.30 115.30 20" x 42' 13467.24 66.07 119.47 7147.14 0.00 0.00 2185.30 2224.15 10-3/4" x 13-1/2" 14700.82 83.63 153.42 7477.30 3.00 67.23 1610 . 1800 7598.30 15809.16/8" X 9-7/8" by 11 14926.15 83.63 153.42 7502.30 0.00 0.00 CD5-17 00.L1TOW 011117 DK 7713.30 27195.19 4-1/2" x 6-3/4" 14926.47 83.63 153.42 7502.34 1.00 -74.88 1800 2850 15714.49 83.63 153.42 7589.75 0.00 0.00 SURVEY PROGRAM 15809.06 86.00 151.85 7598.30 3.00 -33.46 CD5-17 01.Heel 011117 DK 2850 3900 aP1K FFam DaPm 7a suway,P,a, 7aa, 15829.06 86.00 151.85 7599.70 0.00 0.00 3900 4950 36.38 406.90 C05-17wp09 (Plan:C05-17) INC 15943.89 89.44 151.85 7604.26 3.00 0.00 36.38 1909.90 C05-17wp09 (Plan:CD5-17) GYO-GC-SS 1900.99 2000.00 C05-17ap09(Plan:CD5-17) NSA 27195.19 89.44 151.85 7713.30 0.00 0.00 CD5-17 02.Tae 011117 DK 1000.00 2224.15 CO5-17.09 (Plan:C95-17) IAA+IFR-AK-CAE-SC 4950 6000 2224.15 3724.15 C05-17wp09(Plan:C95-171 RIA 2224.15 15809.06 C05-17wp09 (Plan:C05-17) MA•IFR-AK-CAE-SC 15809.06 17309.96 C05-17,09(Plan:CD5-17) MIA 6`000 -/050 15809.06 27195.19 C05-17,09 (Plan:CD5-17) RIA+IFR.AR-CA2-SC V 7050 8100 8100 9150 9150 10200 10200 12310 0/360 12310 14410 14410 `^___ 16520 75 -30/330 70 30 16520 18630 18630 - 20740 65 20740 22840 I C. ��� � -----\ 22840 � 24950 -- 155-��� ,. / /' "�50�\ N • 24950 27055 -60/300, p ‘\\\\ \ 60 '// 3cD517WP0; d-11\)itk`, 7 ,----- 25------ -...N\'\ / 2 I 7., \\ > :- .Lit Alm ;•ni:Iv.'.. 7(2c! ; '',� ! Ye90/270 , - c tee. ;,„, ,1 ei ; -! 90 Otti X1 �� ' tea. � k/ a00•4,~f til R 1� t A �\ 01117'''''::44',164V1-7` fir .eg 4,i ieg�I l /p��$040 � Not t`1 ,. 1 1 .� l:a i m ' }y�V1 ��r 07'004��t� >*'.1 V/ . ..: idgi 11,...�. It, " ~t,�e0a • sir �� ' a �i!kl,��j� c,i ►i� '�it 1 !., D - 13PB1 16,r 120/240 i► '0, tel: 4410 IJP 1"1, , 1) .� 11 X-►i.�►��(41.0��ttordellijkira 'moi.," . 0 04011011111 !' 1 /l it S a�iO A. 0. ' �' A i t' NIlI /// VIII `',R' Il CD5-19L w.I [r .p4�►_ VP a� 0 r. 1 -150/210 �_V/10:%,4--;,, �r 11 .login"nl�ek -L• -- 150 2*ik..VVIINI CD5-316A...,,w;►..m=.any A-1,a 0,..- -3 4Xwp07 V VJ-J J , 80 CL •t(1) • c Northing (6000 usft/in) 1 1 1 , 1 1 1 1 1 1 1 1 1 CL I I I I I I I I I I I I I I I I I I I I I I I 1 1 1 1 1 1 I 1 1 1 1 1 I I I I I 1 I I I 1 1 1 1 1 1 1 1 1 1 1 1 - Q - tl) - C S = t" N - C Q _ — ,Q 0- — O - O c - - -►-' CO - (N — o _ - 0 a _ as U - — c — - sz - ' < m - a 3 — 12) (3 0 i U - rn� — T o- - 0 - In - o�fg@� - u5138-00 — " — J rnU _ Lo O ■I U 0 7 - CO M I 111) CI U— /� U —CO 01 a INc o / c w - o _ u �'' 03 in co—W— U ' in C).1 ----- .....,1.....:....„40 i,„,„„0,,, . ._ . ........ ;„ N% a _ - � am .m� _.,-olU r�Q -o o U 0 ( v - U z r> — 123 / in U - Ur Z3 3 `n co 0 N n M _ U CL 3 Li, ' N 0 00 0 — `n U ccoo U — 7 co in 3 — - I — 410 eL U - n — 1- 1.... — 0 o ? 3 - "Rt„ - - - .0 H LL I I 1 I I I I I I 1 III 1 1 I 1 1 1 1 1 1 1 1 1 III 1 1 1 ii I 1 III 1 1 III 1 IliI II IIIIIIIIII M (uig}sn 0009) 6ulypoN in AC Flipbook • • ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Plan: CD5-17 50103xxxxx00 Plan: CD5-17 Plan: CD5-17wp09 Error Ellipse Survey Report 08 February, 2017 III • SLB Error Ellipse Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-17 Project: Western North Slope TVD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34+36.3 @ 70.30usft(Doyon 19) Well: Plan:CD5-17 North Reference: True Wellbore: Plan:CD5-17 Survey Calculation Method: Minimum Curvature Design: CD5-17wp09 Output errors are at 1.00 sigma Database: EDM Production Survey Tool Program Date 2/8/2017 From To (usft) (usft) Survey(Wellbore) Tool Name Description 36.30 400.00 CD5-17wp09(Plan:CD5-17) INC Inclinometer(Totco/Teledrift) 36.30 1,000.00 CD5-17wp09(Plan:CD5-17) GYD-GC-SS Gyrodata gyro single shots 1,000.00 2,000.00 CD5-17wp09(Plan:CD5-17) MWD MWD-Standard 1,000.00 2,224.15 CD5-17wp09(Plan:CD5-17) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 2,224.15 3,724.15 CD5-17wp09(Plan:CD5-17) MWD MWD-Standard 2,224.15 15,809.06 CD5-17wp09(Plan:CD5-17) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 15,809.06 17,309.06 CD5-17wp09(Plan:CD5-17) MWD MWD-Standard 15,809.06 27,195.19 CD5-17wp09(Plan:CD5-17) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Position uncertainty and bias at survey station Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semi-major Semi-minor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (°) 36.30 0.00 0.00 36.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 UNDEFINED 115.30 0.00 0.00 115.30 1.61 0.00 1.61 0.00 1.15 0.00 0.00 1.61 1.61 0.00 INC 1,1) 500.00 0.00 0.00 500.00 0.63 0.00 0.63 0.00 1.15 0.03 0.03 0.63 0.63 0.00 GYD-GC-SS(2,1) 600.01 1.50 10.00 600.00 0.77 0.00 0.77 0.00 1.16 0.04 0.04 0.77 0.77 135.00 GYD-GC-SS(2,1) 750.23 4.50 10.00 750.00 0.99 0.00 0.99 0.00 1.16 0.07 0.07 0.99 0.99 100.21 GYD-GC-SS(2,1) 1,272.17 7.56 127.69 1,270.30 1.37 -0.02 1.41 0.01 1.18 0.20 0.20 1.41 1.39 117.82 MWD(2,2) 1,322.61 7.56 127.69 1,320.30 1.40 -0.02 1.49 0.02 1.18 0.23 0.23 1.49 1.42 123.93 MWD(2,2) 1,373.04 7.56 127.69 1,370.30 1.40 -0.02 1.49 0.02 1.18 0.23 0.23 1.49 1.42 123.93 MWD(2,2) 2,224.15 24.53 122.19 2,185.30 1.84 -0.14 2.51 0.00 1.21 0.60 0.61 2.52 1.95 131.28 MWD(3,3) 2,244.15 24.53 122.19 2,203.49 1.84 -0.14 2.55 0.01 1.19 0.61 0.63 2.56 1.97 131.09 MWD(3,3) 2,375.58 28.47 121.65 2,321.10 1.82 -0.19 3.07 0.19 1.19 0.69 0.74 3.08 2.02 126.75 MWD(3,3) 3,063.15 49.07 120.13 2,854.30 2.49 -0.51 9.75 1.80 1.65 1.02 2.11 9.76 2.68 121.66 MWD(3,3) 3,630.07 66.07 119.47 3,157.19 3.65 -0.82 17.37 3.95 2.84 1.20 4.18 17.37 3.34 120.81 MWD(3,3) 5,228.22 66.07 119.47 3,805.40 4.90 -0.80 17.11 0.01 4.21 1.68 2.46 17.12 3.44 121.22 MWD+IFR-AK-CAZ-SC(4,3) 5,802.43 66.07 119.47 4,038.30 5.90 -0.80 20.63 0.01 5.14 1.88 2.93 20.63 3.78 121.05 MWD+IFR-AK-CAZ-SC(4,3) 5,966.14 66.07 119.47 4,104.70 6.07 -0.80 21.21 0.01 5.29 1.91 3.02 21.22 3.84 121.03 MWD+IFR-AK-CAZ-SC(4,3) 7,728.47 66.07 119.47 4,819.50 9.12 -0.80 31.83 0.01 8.10 2.62 4.72 31.83 4.96 120.78 MWD+IFR-AK-CAZ-SC(4,3) 10,371.97 66.07 119.47 5,891.70 13.57 -0.80 47.21 0.01 12.18 3.89 7.83 47.22 6.70 120.63 MWD+IFR-AK-CAZ-SC(4,3) 13,166.35 66.07 119.47 7,025.10 18.37 -0.80 63.80 0.01 16.58 5.60 12.02 63.81 8.64 120.55 MWD+IFR-AK-CAZ-SC(4,3) 13,467.24 66.07 119.47 7,147.14 18.83 -0.80 65.38 0.01 17.00 5.78 12.46 65.39 8.83 120.55 MWD+IFR-AK-CAZ-SC(4,3) 13,560.90 67.18 122.28 7,184.30 18.87 -1.16 65.96 -0.76 17.21 5.86 12.68 66.04 8.92 120.56 MWD+1FR-AK-CAZ-SC(4,3) 13,882.39 71.35 131.59 7,298.30 19.30 -2.11 66.08 -2.47 17.69 6.03 13.16 67.37 9.10 120.72 MWD+IFR-AK-CAZ-SC(4,3) 13,894.95 71.52 131.94 7,302.30 19.30 -2.11 66.08 -2.47 17.69 6.03 13.16 67.37 9.10 120.72 MWD+IFR-AK-CAZ-SC(4,3) 14,700.82 83.63 153.42 7,477.30 19.63 -5.04 59.86 -6.66 19.03 6.28 14.17 70.15 9.50 121.66 MWD+IFR-AK-CAZ-SC(4,3) 14,790.95 83.63 153.42 7,487.30 19.80 -5.04 60.26 -6.66 19.20 6.29 14.27 70.49 9.55 121.84 MWD+1FR-AK-CAZ-SC(4,3) 14,817.99 83.63 153.42 7,490.30 19.97 -5.04 60.74 -6.66 19.38 6.31 14.36 70.90 9.58 122.05 MWD+IFR-AK-CAZ-SC(4,3) 14,926.15 83.63 153.42 7,502.30 20.02 -5.04 60.86 -6.66 19.42 6.31 14.39 71.01 9.59 122.10 MWD+IFR-AK-CAZ-SC(4,3) 14,926.47 83.63 153.42 7,502.34 20.02 -5.04 60.86 -6.66 19.42 6.31 14.39 71.01 9.59 122.10 MWD+IFR-AK-CAZ-SC(4,3) 15,714.49 83.63 153.42 7,589.75 21.37 -5.04 84.74 -6.66 20.78 6.42 15.19 74.32 9.94 123.71 MWD+1FR-AK-CAZ-SC(4,3) 15,809.06 86.00 151.85 7,598.30 21.17 -5.55 66.23 -6.14 20.84 6.43 15.21 74.83 10.05 123.84 MWD(4,4) 15,829.06 86.00 151.85 7,599.70 21.17 -5.55 66.36 -6.05 20.84 6.43 15.20 74.94 10.06 123.89 MWD(4,4) 15,943.89 89.44 151.85 7,604.26 20.88 -6.31 67.12 -5.59 20.85 6.44 15.12 75.61 10.14 124.18 MWD(4,4) 27,195.19 89.44 151.85 7,713.30 29.25 -6.31 107.18 -6.33 29.22 6.55 25.96 110.94 22.84 136.56 MWD+IFR-AK-CAZ-SC(5,4) 2/8/2017 3:35:06PM Page 2 COMPASS 5000.1 Build 74 Pool Report • • CD5-17wp09 Surface Casing n CPA: Coo-dinate Con O From: - To:__ _---_ __ Datum: [I4AD83 ;1 Region: lalaska Datum: INAD27 '] Region: lalaska �', l ='-'" Latitude/Longitude 1Decimal Degrees jJ V Latitude/Longitude Decimal Degrees +' - UTM Zone. ._.._-.___ (— South C1 UTM Zone: True f South State Plane Zone: 14 '._l Units: us-ft T (: State Plane Zone: —4-1;1 Units: us ft C Legal Description(NAD27 only) r- Legal Description(NAD27 only) Starting Coordinates: -------- Ending Coordinates: -- ___—..__ - X: 11489499.80 X: 1 349466.647414236 = Y: 15965441.18 Y: 15965695.21215847 Transform Quit I Help I CD5-17wp09 Surface Casing E=9 CPA:coo-dinate Con p x From: To: Datum: NAD83 Region: alaska Datum: r---- NAD27 .I Region: 1alaska w C Latitude/LongitudeDecimal Degrees ;1 C Latitude/Longitude !Decimal Degrees ' C UTM Zone: 1 South C UTM Zone: ITrue P South 4" State Plane Zone: 4 j Units: lus-ft w C State Plane Zone: 4 T I Units: 111,1T57,1 { C Legal Description(NAD27 only) C. Legal Description(NAD27 only) IStarting Coordinates: Legal Description — 1489499.80 Township: 011 IN � Range: 004 E Y: 15965441.18 Meridian: 1U Section:118 FN L j 1514.56419 FEL 12509.0425 Transform l Quit Help ill • CD5-17wp09 Surface Location CPA!coordinate Con�rerb��' , ' �= . 1E1. (; . w From: To: — — Datum: [NAD83 Region: alaska Datum: NAD27 .1 Region: lalaska `__ Latitude/Longitude Decimal Degrees J C- Latitude/Longitude 'Decimal Degrees (i LITM Zone: I— South C. UTM Zone: True r South ((" State Plane Zone: •4-----W.1 Units: us-ft + ( State Plane Zone: 4 Units: us-ft + r[ Legal Description(NAD27 only) C Legal Description(NAD27 only) Starting Coordinates: — — Ending Coordinates: X: 11489264.31 X: 1 349231.159642637 Y: 15965575.11 Y: 15965829.15031473 I i Transform Quit I Help CD5-17wp09 Surface Location r CPA:Coo=dinate Converter From: To: Datum: NAD83 J Region: alaska Datum: I---NAD27] Region: alaska • Latitude/Longitude )Decimal Degrees +' C Latitude/Longitude Decimal Degrees (-- UTM Zone:1 r South C UTM Zone: IT rue E South C*" State Plane Zone: 4 +1 Units: lus-ft +; C State Plane Zone: 14 , Units: us-ft C Legal Description(NAD27 only) C: Legal Description(NAD27 only) - Starting Coordinates: --- Legal Description X: 11489264.31 Township: 1011 N Range: 004 E Y: 1 5965575.11 Meridian: Uzj Section:11$ i__ FNL 1385.35159 FEL 12746.6855 Transform Quit I Help • • CD5-17wp09 Kick-off Point r Efj CPFS . _ 1 o Coo-diSlate Converter From: —To: Datum: _ Rc ion: Datum: Rc ion: N.�D$3 9alaska 1--- NAD-2-7 9 alaska ...�f C Latitude/Longitude Decimal Degrees ,! C Latitude/Longitude Decimal Degrees C UTM Zone: ® 1— South C UTM Zone: .._T_.. rue I— South ('+' State Plane Zone: 4 Units: us_ft State Plane Zone: 4 Units: us-ft T t' Legal Description(NAD27 only) C Legal Description(NAD27 only) Starting Coordinates: Ending Coordinates: X: 11489264.31 X: 1 349231.159642637 Y: 15965575.11 Y: I 5965829.15031473 Transform 11 Quit I Help 1 CD5-17wp09 Kick-off Point t ri_ CPA:Coordinate Converter . From: _ ------- —To: --- Datum: INAD83 Region: lalaska �.! Datum: NAD27 Region: 'alaska J C Latitude/Longitude !Decimal Degrees C Latitude/Longitude !Decimal Degrees _:f C UTM Zone: - E South r UTM Zone: True E South it State Plane Zone: 4 Units: us-ft T r State Plane Zone: 14 I Units: us-ft r Legal Description(NAD27 only) 1 Legal Description(NAD27 only) Starting Coordinates: , Legal Description X: 11489264.31 _� Township: fair N Range: 1004 E Y: .5965575.11 Meridian: IU ,1 Section: 18 Fir-CI 1385.35159 FEL 12746.6855 Transform Quit I Help 0 • • CD5-17wp09 Top of Production ti CPA:Coordinate Convertere From: —To: Datum: 1NAD83 .1 Rogian: lalaska jj Datum: {NAD27 ' Rogion: alaska '1 C Latitude/Longitude Decimal Degrees r Latitude/Longitude (Decimal Degrees zi UTM Zone: J f South C UTM Zone: True I— South State Plane Zone: 14---;!" Units: us ft C`•' State Plane Zone: 14 t j Units: us-ft . C Legal Description(NAD27 only) C Legal Description(NAD27 only) Starting Coordinates: _ __._ Ending Coordinates: _ X: 1499315.00 X: r 359281.681633345 Y: 15958488.00 Y: 15958741.67028855 Transform ii Quit I Help 01111101/11111111111 CD5-17wp09 Top of Production I x- N CPA.:_ oo-dinate Ccn r-er From: To:— _ Datum: — NAD83 . Region: Ialaska Datum: NAD27 Region: lalaska C Latitude/Longitude !Decimal Degrees . C Latitude/Longitude Decimal Degrees . C UTM Zone: I P South C UTM Zone: 1True r South 4" State Plane Zone: 14 71 Units: us-ft C State Plane Zone: KT,.-1! Units: us-ft ( C Legal Description(NAD27 only) Ci' Legal Description(NAD27 only) Starting Coordinates: ----- -__—__--- Legal Description X: 1499315.00 _ Township: 011 IRE Range: 004E Y: 15958488.00 - Meridian: u -'.:f S ection:1 21 FNL 11997.0572 FEL 13141.8712 t Transform l. Quit I Help • • CD5-17wp09 Intermediate Casing I [`.g CPA ;oordinate Corr: r-er (-_"` 151 From: To: Dotum: INAD83 j Region: alaska +' Datum: 1—NAD27 w -d Rcgion: ialaska LatitudelLongitude Decimal Degrees ._:J +'-" Latitude/Longitude Decimal Degrees --;"1 UTM Zone: --- fl South C UTM Zone: 11-6;11 — r (- South ri"- State Plane Zone: F4-1-1.-1. Units: us-ii—;1 r: State Plane Zone: 4 + Units: us ft i C Legal Description(NAD27 only) r Legal Description(NAD27 only) - Starting Coordinates: — Ending Coordinates: -- X: 11499315.00 X: 1359281.681633345 Y: 15958488.00 Y: 15958741.67028855 Transform Quit Help CD5-17wp09 Intermediate Casing I GPA- Go fciinate From: To: — Datum: Ngp83 Region: lalaska I Datum: 1-NAD 27 Region: lalaska L__ Latitude/Longitude 'Decimal Degrees +I `- Latitude/Longitude 'Decimal Degrees 21.1 C UTM Zone: I r South C UTM Zone: 'True ISouth '+ State Plane Zone: F47—+ Units: rus-ft C State Plane Zone: 4 + Units: us-ft + Legal Description(NAD27 only) (+- Legal Description(NAD27 only) Starting Coordinates: ! Legal Description — 1499315.00 Township: j011 IN Range: 004 E + Y: 5958488.00 Meridian: lu Section:121 FNL 1997.0572 FEL 13141.8712 Transform I Quit I Help I m----sn rw._"_rtr,_.r... -.r • • CD5-17wp09 TD r In CPA:Coofdinate Converter ;; O From: _ _ To: _._. Datum: 1NAD83 -; Region: lalaska :_nj Datum: 1NAD27 � Region: rata-,T.;—":71 C Latitude/Longitude 'Decimal Degrees C Latitude/Longitude Decimal Degrees C UTM Zone: 1-- South C' UTM Zone: True f South t4" State Plane Zone: IYUnits: lus-ft j aState Plane Zone: IY __-__, Units. us-ft C`" Legal Description(NAD27 only) } - Legal Description(NAD27 only) Starting Coordinates:--- ---- --- Ending Coordinates: -.- .... -- X: 11504483.00 X: 364449.220592777 Y: 15948344.00 Y: 15948597.36833557 Transform ii Quit I Help CD5-17wp09 TD I. r CPA:Coo-dinate Converter i ,•, From:- -- — — ---- To: Datum: INAD83 Region: lalaska zi i Datum: NAD27 7.-1 Region: lalaska C Latitude/Longitude 'Decimal Degrees C Latitude/Longitude ]Decimal Degrees 21.1 C UTM Zone: I I— South C UTM Zone: 1True r South Com" State Plane Zone: I4 Units: us-ft C State Plane Zone: II-71 Units: us-ft ✓ Legal Description INAD27 on12,M) 4- Legal Description(NAD27 only) Starting Coordinates: Legal Description X: 11504483.00 Township: 1011 IN w Range: 004 E D., Y: 15948344.00 Meridian: IU ..- Section:134 1._._._.__- _ _.._.._..._ __ FN L + ITE.-F 13090.2858 TransformQuit Help I 0 IIa� d �� eo IS o ��► `i as �sr 3t a cs A 7G a pJ BOJ ZO£ ] J n �D pJ a <<OJ •-• % `no, PJ A Z cl a O o `c� 0 CD Zs 111 C1 00 03 :slug . es o 1� f,888 ;'� J/ u AJ I 111\ ` � • i461. OJ �¢d ��. O �e� • d e ��£ Nt off..... . , tli —O Soo b• \�\\ 0.....OJ c� '� 1 �i °OJ (0 J N pJ J as o22^ N m , mp .... .11k,1 - O �/ II IS Y Y O O�Mr J t'� gp�V „ O 3 0 0 ~pre* •'do' ec'.'... t �r. IINo_v a a M ° Ja_� O , IpJ a J ` 6c S+ _ Sao t Gtli v Sr , OJ 5 Zoon o s OJ o `. O `aOJ ,aodIF — ::: co 0 00 e )o d' o� �6 1 s J ++ s, J p�4.32� O N ....................._....-....zlCit a° , . ..................................................-._.......... O C13N W sri / , I a) O _,Agiri _ ‹. 1 el el VI An 0 o > CO s s°J J ;0____1( O el •CrI Sow LO al m itlL `o, M v o U (Q 1 u ' V wii 0 T; 0 N 0 o Cid - I V R O O o Q o coo1 3 o O o O o y Q O o Q Q LL CO ("\I (.0 o (u!/4Sn 0000 (+)WJoN/(-)u0noS c� I O O O CO ., ti888 o .888 6 a a N w a 222Q L O O O YY O T'-_•- r 0� 41.0 0 Q• O O- Q. ! N i1 0 E000 ZUUU O U) O r�F _ C (.0! Sp0 ,- O )6 s 5— 61 pJ + 0 O JJ 1 4-I C0-4.32 O to ,p ZZVIRCID0 Ca s I N W s o +' N CD c)/ 0 > 19 i Qt.: of • CO CL W ,:c>0 II MIMI ''l tee' O . .._...... 0 It c-• 1 v U t� M • .1� O J N. O N O li co 0 O CI . d- cc6O O O O O O 1 i O O O O O d O O O 0 O u- CO N CO O Lo iii (ui�T4sn 0000 (+)W�oN/NLIVoS cI 0 • O O O CO N N pp_QQ_ Q Np0p00 g ,088 K a, aKK o N UUU 'cr N W 0 rsm . o x O �o O 000 3 g a << N oss a; , s° _ ' v E000 z000 O N o !) (0 c 0 Nr Oi 'J aJi itp 0ZZvao , ' D .321 ON O al o, N W °v' �4 sp N 3 W O o 0 > / \-e., oo ..... N. E r O 1 L O LO G) NI- Ci L U = CI \,i O �� O a O CV .......... .................. _.__. .............. ........-O a 0 O O O O O ' O 0 0 O O LL 0 0 0 0 O CO N (fl O (u!/}4sn 0000 (+)WjaoN/(-)innoS c� II • V66-9C10 9 1.-9aO1 6Qd/AL 6-5aol_-OO1ZZ 00 , - N c N M 00092 co X ■_ N 679;.`5401 00052 Q C ° 1 O ON C moo '0iiZ _ oi a) ' 00�£Z o O N co co oo,zz I 0 o ' O b69 ' I N 09062 o ..- -O (a CO c r 0 00002 aa) co To 0 CD5-99AL1 01061. o ami \\ 00091. \ II1 r II Q II O so-gda 1— CO — C) :: ti C J �\ ` II O \ y \ II\ 40 o 1 ,.I \ ha:LI0 CL ', I Q o U 0 N 009'6 P_ . s-• / W 00` u i -/. Q Q ` ii I 0o • \\♦ II a-ga X 0.•G \ .I II i CO Gs VJ 1 90-9a4 _ F.I II 1 II 1 I! t i 11 I I I T 0 0 0 0 0 0 0 o O o O N co In co co CA gTdaa Ie3!iieA anal . • N � U aU ;UID \ U a) 5 t( -i M 0 U .a � Q o 1 Hi � L U M 1 p U .f.. 1:.,, , .:::::,::,... .0...! ' ' ..,/„... M A L 4q' Los: , ',-', w L6,p U 0 0 'lm" M ''I lin 7 , 0 As - built REV DATE _ BY CK APP • DESCRIPTION REV DATE BY 0 APP DESCRIP110N 1 4/24/15 CZ DB C.A. UPDATED PER K150003ACS 2 5/2/16 CZ GD C.A. UPDATED PER K160003ACS ALPINE SATELLITE DEVELOPMENT LOCATION OF - �' 'r ' 14.THIS SURVEY T12�,PADCD-5 0 T11N ...--CD4 TO ALPINE l D2 �i �'CDS�* �� 4 .�+`` ACCESS ROAD tr — �, .� CD5 411116.. 1 1 '/ N '%-P-711 1 �� PR•113% , �y D ISI Mr - =' .1 VICINITY MAP NOT TO SCALE LEGEND: O PROPOSED CONDUCTOR • EXISTING CONDUCTOR SECTION 7, T. 11 N., R. 4 E., U.M. SECTION 18, T. 11 N., R. 4 E., U.M. CD-5 R OF pPp � ag�a� PAD ff OES�GN s\-\(0"-° �0 oQ,-,02,(30'3,,,,,-;� x x oo 9.00 \ rcx et - \ ‘ -AY- 00 N -� •• ,Wi0�• • . . - - - r,,,, v3,:,_,, x PLANT N N 0 NOTE: 15.4052" o�` CONDUCTOR CD5-x14 WAS PLUGGED AND ir oABANDONED APRIL 2016. �ll Z 37\ KUUKPIK I rn cc, UMIAQ rn ALPINE SURVEY OFFICE PHONE:907-670-4739 `/ ALPINE MODULE:CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD-5 WELL CONDUCTORS Alaska, Inc. AS-BUILT LOCATIONS CADD FILE NO. DRAWING NO: I PART: REV: 15-03-02-1 04/18/2015 CE—CD50-1025 1 OF 3 1 2 REV DATE BY CK APP DESCRIPTION REV DATE BY APP DESCRIPTION 1 4/24/15 CZ DB C.A. UPDATED PER K150003ACS 2 5/2/16 CZ GD C.A. UPDATED PER K160003ACS ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC. 18, T 11 N, R 4 E, U.M. SEC.LINE 0/S EXIST. WELL 'Y' 'X' LAT.(N) LONG.(W) FNL FWL GND PAD CD5-x99 5,965,666.90 ,489,591.67 70' 8' 49.211" 151' 13' 20.820" 287' 2508' 27.5 33.9 CD5-x01 5,965,661.64 ,489,572.44 70' 8' 49.155" 151' 13' 21.378" 293' 2489' _ 27.6 34.1 CD5-x02 5,965,656.28 ,489,553.29 70' 8' 49.099" 151' 13' 21.934" 299' 2470' 28.1 34.1 CD5-x03 5,965,650.92 ,489,534.00 70' 8' 49.042" 151' 13' 22.493" 305' 2451' 28.4 34.1 CD5-x04 5,965,645.24 ,489,514.77 70° 8' 48.982" 151' 13' 23.051" 311' 2432' 26.6 34.2 CD5-x05 5,965,639.80 ,489,495.46 70' 8' 48.925" 151' 13' 23.611" 316' 2412' 28.1 34.3 CD5-x06 5,965,634.56 ,489,476.20 70' 8' 48.870" 151' 13' 24.170" 322' 2393' 27.7 34.3 CD5-x07 5,965,629.08 ,489,457.08 70' 8' 48.812" 151' 13' 24.724" 328' 2374' 27.9 34.3 CD5-x08 5,965,623.88 ,489,437.69 70' 8' 48.757" 151' 13' 25.287" 334' 2355' 28.1 34.3 CD5-x09 5,965,618.27 ,489,418.53 70' 8' 48.698" 151' 13' 25.842" 340' 2336' 27.3 34.2 CD5-x10 5,965,613.12 ,489,399.13 70' 8' 48.644" 151' 13' 26.405" 345' 2317' 28.1 34.1 CD5-x11 5,965,607.66 ,489,379.86 70' 8' 48.586" 151' 13' 26.964" 351' 2297' 27.9 34.1 CD5-x12 5,965,602.23 ,489,360.56 70' 8' 48.529" 151' 13' 27.524" 357' 2278' 28.0 34.1 CD5-x13 5,965,596.59 ,489,341.43 70° 8' 48.470" 151' 13' 28.079" 363' 2259' 26.1 34.2 CD5 x14 .5,96-6,591.36 ,489,322.33 70' 8' 48.414" 151' 13' 28.633" 368' 2240' 27.6 34.2 CD5-14X 5,965,589.94 ,489,317.35 70' 8' 48.400" 151' 13' 28.777" 370' 2235' 27.5 33.8 CD5-x15 5,965,586.10 ,489,303.11 70' 8' 48.359" 151° 13' 29.190" 373' 2221' 26.8 34.2 CD5-x16 5,965,580.48 1,489,283.58 70' 8' 48.300" 151' 13' 29.757" 380' 2202' 27.6 34.0 CD5-x17 5,965,575.11 ,489,264.31 70' 8' 48.243" 151' 13' 30.316" 386' 2183' 27.7 34.0 CD5-x18 5,965,569.79 ,489,245.23 70' 8' 48.187" 151' 13' 30.869" 391' 2164' 27.7 33.9 CD5-x19 5,965,564.42 ,489,225.90 70' 8' 48.131" 151' 13' 31.430" 397' 2144' 28.0 33.9 CD5-x20 5,965,558.96 ,489,206.70 70° 8' 48.073" 151' 13' 31.987" 403' 2125' 25.8 33.8 CD5-x21 5,965,553.51 ,489,187.22 70' 8' 48.016" 151' 13' 32.552" 409' 2106' 27.8 33.8 CD5-x22 5,965,548.14 ,489,168.15 70' 8' 47.959" 151' 13' 33.105" 415' 2087' 27.7 33.7 CD5-x23 5,965,542.72 ,489,148.81 70' 8' 47.902" 151' 13' 33.666" 420' 2068' 26.4 33.7 CD5-x24 5,965,537.42 ,489,129.64 70' 8' 47.846" 151' 13' 34.222" 426' 2049' 28.0 33.7 CD5-x25 5,965,532.01 ,489,110.28 70' 8' 47.789" 151' 13' 34.783" 432' 2029' 27.7 33.7 CD5-x26 5,965,526.59 ,489,091.09 70' 8' 47.732" 151° 13' 35.340" 438' 2010' 26.3 33.7 CD5-x27 5,965,521.20 ,489,071.88 70' 8' 47.675" 151' 13' 35.897" 444' 991' 27.5 33.7 CD5-x28 5,965,515.81 ,489,052.48 70' 8' 47.618" 151' 13' 36.460" 449' 972' 27.4 33.6 CD5-x29 5,965,510.40 ,489,033.34 70' 8' 47.561" 151' 13' 37.015" 455' 953' 27.6 33.6 CD5-x30 5,965,504.97 ,489,014.02 70° 8' 47.504" 151° 13' 37.575" 461' 934' 25.3 33.6 CD5-x31 5,965,499.57 ,489,994.73 70' 8' 47.447" 151' 13' 38.135" 467' 915' 26.6 33.6 CD5-x32 5,965,494.13 ,488,975.45 70' 8' 47.390" 151' 13' 38.694" 473' 895' 26.8 33.6 CD5-x33 5,965,488.75 ,488,956.35 70' 8' 47.333" 151° 13' 39.248" 478' 876' 27.0 33.6 ` 111! t NOTES 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 83. 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL KU7�UKPIK (B.P.M.S.L.) U N. I A Q 3. CONDUCTOR CD5-x14 WAS PLUGGED AND ABANDONED APRIL, 2016. ALPINE SURVEY OFFICE PHONE:907-670-4739 `,V ALPINE MODULE:CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD-5 WELL CONDUCTORS Alaska, Inc. AS-BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 15-03-02-1 04/18/2015 CE-CD50-1025 1 OF 3 2 • iJi31i7 CD5-17 Area of Review This Area of Review is required as CD5-17 is being permitted as an Alpine C and A injector. This AOR discussed the wells that fall within 1/4 mile of the wells entry point into the Alpine C sand. The table below review the wells that fall within the 1/4 mile radius of CD5-17. Top of Alpine C Top of Alpine C Top of Cement Top of Cement Top of Cement Cement Mechanical Well Name Status Sand(ND) Sand(MD) (ND) (MD) Determination Reservoir Status Zonal Isolation Operations Intergrity MITIA on 1/27/2017 to 3500 Well open to psi and MITT to Production in CBL top of 155 bbl 15.8 Class 4600 psi CDS-99A Producing 7473 15032 6768 13078 Sonic CBL Alpine A cement at 13078 G 1/27/2017 Well barefoot Good cement job MITIA on completion in and top of 11466115.8 ppg 7/24/2016 to 2600 CDS-O8 Injecting 7407 10351 6371 8300 Sonic CBL Alpine A cement at 8300 Class G psi Shut In Injector Calculated based Perforated and Good cement job MITIA on (surface casing on gauge hole(8-injecting into and perforations 62 bbl 15.8 Class 1/27/2017 to 3500 CD4-321 leak) 7548 18933 6823 169713/4"x7) Kuparuk C sand just in Kuparuk C G psi CD5-99A 9-7/8"x 11" intermediate section was drilled and cased with 7-5/8" casing down to 15571' MD. The Alpine C zone was penetrated at 15,082'. The intermediate casing was cemented with 155 bbl of Class G cement(plugs bumped and floats held) and top of cement was measured with a CBL at 13078'. A horizontal production section was drilled in the Alpine A and completed with frac ports. A second lateral was attempted in the Alpine C but due to drilling challenges was not completed. The well is completed as a single lateral producer in the Alpine A sand. A passing MITIA to 3500 psi was completed on 1/27/2017. CD5-08 9-7/8"x 11" intermediate section was drilled and cased with 7-5/8" casing down to 10872'. The Alpine C zone was penetrated at 10351'. The intermediate casing was cemented with 114 bbl of Class G cement (plugs bumped and floats held) and top of cement was measured with a CBL at 8300'. A horizontal production section was drilled in the Alpine A sand and was a barefoot completions. The well was completed as a single lateral injector in the Alpine A sand. A passing MITIA to 2600 psi was completed on 7/24/2016. CD4-321 8-3/4" production section (slant well with just two casing strings)was drilled and cased with 7" casing down to 19321'. The Alpine C zone was penetrated at 18933'. The production casing was cemented with 62 bbl of Class G cement(plugs bumped and floats held)and top of cement is calculated based on gauge hole at 16,971'. The well was then perforated and set up for injection into the Kuparuk C sand. A passing MITIA to 3500 psi was completed on 1/27/2017. • 0 8 YO N 8 2 O 2 To• Y C •- O O -O ') O 00 0 O rg CV u `� Q ^ C a...... a V Q • v N. Fhi — H _ F- 2 c a C. r-1 n O. 2 ri C N vt co Q N U o. f6 VI 00 CO U C V1 V) co 4+ O "� a."I .vi C a) fO .O -0 0 £ N V cu CLLf1 L.) O e- c.7 r�-1 U LO IO 00 -0 -C2 . U O O c C r, 80 i O - L e-I N v 00 ..•fi 00 CO E E O 7OO ( OfO ` N G al a CD C O C U O C V O C TO .. aJ 'O a-. aJ 'O O. .- C J E O C E 00 "O N mc N U u C.9 co u C7 fa N 7 'O '0 .. C •+' C C O C CO O O m f0 N C O C -O C V C11O o 0 j d CO cu CO N %.- C L. aJ = 'O •C — a• c w U m al o a aJ E •n v a z a Q iV Q d .E Y v 0c C , O E f0J J t a) C m m aL.' '_ w E U U fO 3 n O N u U U , x o. N C c a I- C3 VOi vN. p8ii CO O m N. O m on C m r-1 aJ E v U ,..- o O I- pp l0 h N aJ E CJ U w O 0 a N .-i CO M V1 M U al VV) O CO al .--I r-I 1-1 C a 0 a 2 O 71 Q c O cc I- vl M N U n al C_ _ Q E az O -O ac O CO I- N ilL CO CD p0 N Z Owl O M LA IA 4 ) 0 0 0 • • Loepp, Victoria T (DOA) From: Loepp,Victoria T(DOA) Sent: Friday, March 24, 2017 9:36 AM To: Dai,Weifeng Subject: RE: [EXTERNAL]CD5-17(PTD 217-017)Anti-collision t tl Thank you Weifeng,that is what I needed to know. From: Dai,Weifeng [mailto:Weifeng.Dai@conocophillips.com] Sent: Friday, March 24, 2017 9:35 AM To: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov> Subject: RE: [EXTERNAL]CD5-17(PTD 217-017)Anti-collision Victoria, Current status of CD4-321 is still on injection,we plan to shut it in only when drilling CD5-17 laterals. Weifeng Office:(907)-263-4324 Cell Phone:(907)-342-9508 From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent:Thursday, March 23,2017 1:36 PM To: Dai,Weifeng<Weifeng.Dai@conocophillips.com> Subject: RE: [EXTERNAL)CD5-17(PTD 217-017)Anti-collision Weifeng, What is the current status of CD4-321 and what will be the status while drilling CD5-17? Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp a.alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victorialoem@alaska.gov From: Dai,Weifeng[mailto:Weifeng.Dai@conocophillips.com] Sent:Wednesday, March 22,2017 6:20 AM 1 To: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov> • Subject: RE: [EXTERNAL]CD5-17(PTD 217-017)Anti-collision Victoria, As per the CD5-17wp09,when geo-steering from 21,531'to 21,478' in Alpine A sand, CD5-17 has collision with CD4-321 from 18,775'to 19,050'. In CD4-321,the A sand top is 19,116' MD,that means, at the collision depth,these 2 wells actually is separated geologically. In other words,the CD4-321 already geologically above CD5-17 at the collision depth range. As per the CD5-17L1wp09,when geo-steering from 21,635'to 21,526' in Alpine C sand, CD5-17L1 has collision with CD4- 321 from 18,375'to 18,925'. In CD4-321,the C sand top is 18,933',the C sand bottom is 18,955',that means,at the collision depth,there 2 wells actually is separated geologically too. In other words,the CD4-321 already geologically below CD5-17L1 at the collision depth range. The failed anti-collision is majorly due to survey uncertainty,the center to center distance is actually more than 200',see the attached collision report. Another mitigation is MWD survey,if we see magnetic interference on MWD survey,we know this 2 wells are close. Please let me know if you have any questions. Weifeng Office:(907)-263-4324 Cell Phone:(907)-342-9508 From:Alexa, Kurt J Sent: Monday, March 20,2017 6:54 AM To: Dai,Weifeng<Weifeng.Dai@conocophillips.com> Subject: FW: (EXTERNAL]CD5-17(PTD 217-017)Anti-collision Dave forwarded this to me. Are you doing 17 or am I. Kurt Alexa Staff Drilling Engineer ConocoPhillips Alaska (907) 263-4933 ( Office ) (907) 787-9637 ( Cell ) From: Lee, David L Sent: Friday, March 17, 2017 10:06 AM To:Alexa, Kurt J<Kurt.J.Alexa@conocophillips.com> Subject: Fwd: [EXTERNAL]CD5-17(PTD 217-017)Anti-collision Begin forwarded message: From:"Loepp,Victoria T(DOA)"<victoria.loepp@alaska.gov> Date: March 17,2017 at 11:02:46 AM PDT To:"david.l.lee@conocophillips.com" <david.l.lee@conocophillips.com> Subject: [EXTERNAL]CDS-17(PTD 217-017)Anti-collision David. 2 • • CD4-321 fails major risk in the anti-collision analysis. What measures will be used to mitigate this risk? Will CD4-321 be SI while drilling,or a deep plug set? Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepn alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793- 1247 or Victoricaoem@alaska.gov 3 • • Well: CRU CD5-17 <_=Data Input MR "Int Name: CPAI <_=Data Input Mud Weight(ppg) 11.00 <==Data Input Weak point or LOT-Measured depth(ft) 2,244' <==Data Input Weak point or LOT True vertical depth(ft) 2,185' <==Data Input Weak point or LOT-Hole angle(deg) 24.0° <==Data Input Weak point or LOT-Hole size(in) 13.500" <==Data Input Weak point pressure or LOT-EMW(ppg) 13.00 <_=Data Input ler Zone of interest-Measured depth(ft) 15,809' <==Data Input Zone of interest-True vertical depth (ft) 7,598' <==Data Input Zone of interest-Hole angle(deg) 86.0° <==Data Input Zone of interest-Hole size(in) 11.000" <==Data Input Zone of interest-Pore pressure EMW(ppg) 9.10 <_=Data Input Gas gradient(psi/ft) 0.10 <==Data Input Bottom hole assembly OD(in) 8.0" <==Data Input Bottom hole assembly length(ft) 151' <==Data Input Drill pipe OD(in) 5.000" <==Data Input BHA annular vol.@ zone of interest(bbl/ft) 0.0554 DP annular vol.@ zone of interest (bbl/ft) 0.0933 -•DP annular vol. n weak point(bbl/ft 0.1528 411111.0111F , Additional safety margin(psi) 0.00 <==Data Input Weak point pressure(psi): Pio 1,477 psi Weak point pressure-Safety margin: Pmax 1,477 psi Pmax EMW 13.00 ppg Max anticipated formation pressure(psi): Pf 3,595 psi Weak Pt to Zone of Interest distance(TVD ft): OH {TVD} 5,413' Weak Pt to Zone of Interest distance(MD ft): OH MD} 13,565' Maximum influx height at the bit (TVD ft): H {TVD} 2,072' Maximum influx height at the bit (MD ft): H (MD 29,701' Calc.volume of(H)around BHA: V1 bha 8.4 bbl Calc.volume of(H)around drill pipe: V1 dp 2755.8 bbl Calc.volume that H equals @ initial shut in: V1 2764.1 bbl Calc.vol.that H equals @ weak point(MD ft): Vwp 346.4 bbl Calc.volume of Vwp @ initial shut in: V2 142.3 bbl INIONEr Kick Tolerance: V2 142.3 bbl NOTE: V Loe• • 3/17117 NM l... . S Bettis, Patricia K (DOA) From: Lee, David L <David.L.Lee@conocophillips.com> Sent: Monday, February 13, 2017 3:40 PM To: Bettis, Patricia K (DOA) Subject: RE: CRU CD5-17 (PTD 217-017): Permit to Drill Application Attachments: CD5-17 AOR.docx Patricia, attached please find the AOR for CD5-17. If the AOGCC needs anything else please let me know. Thanks David From: Bettis, Patricia K(DOA) (mailto:patricia.bettis@alaska.gov] Sent: Friday, February 10, 2017 2:52 PM To: Lee, David L<David.L.Lee@conocophillips.com> Subject: [EXTERNALJCRU CD5-17 (PTD 217-017): Permit to Drill Application David, I talked with Guy Schwartz and he gave me another"go-by chart" that he recommends to use. Please see Attachment. Thank you, Patricia From: Bettis, Patricia K(DOA) Sent: Friday, February 10, 2017 1:50 PM To: Lee, David L(David.L.Lee@conocophillips.com) <David.L.Lee@conocophillips.com> Cc: Loepp,Victoria T(DOA) (victoria.loepp@alaska.gov) <victoria.loepp@alaska.gov> Subject: CRU CD5-17 (PTD 217-017): Permit to Drill Application David, We appreciate ConocoPhillips providing the plats for the AOR, including the 3-D view; however, at times it is difficult to determine from those plats what wells are within the AOR. I attached a guidance document for ConocoPhillips' use and a AOR "go-by" that includes a table that includes distance from proposed injection well, completion details, and annulus integrity/cement conditions and discussion of other wells within the AOR. Submittal of this type of form with the Permit to Drill Application for an injector or for a request to convert a producer to injector would greatly aid the AOGCC's review of ConocoPhillips' applications. Please submit a detailed discussion for the AOR for CRU CD5-17 that includes an evaluation of the integrity/cement conditions of all wells within the AOR. Thank you, • • Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 2 • • Bettis, Patricia K (DOA) From: Lee, David L <David.L.Lee@conocophillips.com> Sent: Monday, February 13, 2017 2:51 PM To: Bettis, Patricia K (DOA) Subject: RE: CRU CD5-17 (PTD 217-017): Permit to Drill Application Good afternoon Patricia,yes ConocoPhillips does plan to pre produce CD5-17, and will pre produce it for about 1 month. Thanks David From: Bettis, Patricia K(DOA) [mailto:patricia.bettis@alaska.gov] Sent: Friday, February 10, 2017 11:46 AM To: Lee, David L<David.L.Lee@conocophillips.com> Subject: [EXTERNAL]CRU CD5-17 (PTD 217-017): Permit to Drill Application Good morning David, Does ConocoPhillips plan to pre-produce CRU CD5-17; and if so,for what duration? Thank you, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 Tel: (907)793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 1 • • TRANSMITTAL LETTER CHECKLIST WELL NAME: CR(l, C j - 1 7- PTD: ( )7" — d Development /Service Exploratory Stratigraphic Test Non-Conventional FIELD: /ti /)6.. 1(1 � POOL: c1 U I/i.. R V J A-/70 i\e1/' Ct') Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10'sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a)authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are also required for this well: Well Logging Requirements / Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 0 • III , S' ; m Co .!? a. v; Jo c`a , o ; o ,, Q Q. ; o' -o . a c, L rn o' ' El . a .o , c. a a) a 4 �S va , o, e - m �o o ' t- o E O , d , O' 2 oco a E'_' w _' O. • C c' _ o. z a •a .' , 'o, , 6 .0.c, 0 , oO' ' I a mcu 0) ' p o ' E. c , ' E o co L' 01 a c' , 4 1-. per°„' .-' .r' @ @� O' �'T. N. O' M Q 4 a)' z N; E �, .' a Q U' CO• CO CO, rn, a n, 0' r N C . , , N p, a, a U. Q� p� a� . N, , coi Q, .g > N. J, E. .�, b' M' E 0, a ° a' o. 0. CO a _ a' O' c, a , o ,� X E O S. co 4, y, p; .` c, a u? N, a, -0 J JZ' a co ca ' U' O, , �' ' a, 17)"' E a N � V, y' o, J Cl.' a, N 2. .L.. CO, a N. o —. <°j. -O '8, S. �. 8. �. O, J O Q' Q, c a' ' a> �' a' �15, 9. �; 5 4 a ; .. O' ai O CO 0. sr0) :a c a a �' a U Q �, �' �, rn' _, , , a) .n; a; c ul , ; a' ?'' a ; �, �; a' �; y. r'co, , 'Z, al E a , W. ul)' W �. L' '3 6 °' V a U' , 0) a °' O P. , N CO uc, CO O) , CO, '. co O a, 0' -I' m'' m'' E, U 0, -a y 41' , 7' , C' w 3'' €, N' �; 0. f°' -)'' z,)' .2' Z Z U ]. a. �. a' co, U. a o, o ; , 0 a' 0 o' a' E, 0. E' ° _ 0 I • Z , w, CC' O O O a)' O, re' o 0 o;, , o' rn , 'E, > 6' a' , N' N' a o ' C LU LL O' C? C? O ' Q' C) co cn a' W. • Q .' 2' 2' z' U =' w' r" 0 rt- W — } , . . > > } }, } } ' } , . } z } , } } 0, , zz o -,t z } } } } - } , >- } ' } } >- zz >- } >- > }' > } ' } , ZCf1 a) co co U �> p, :c E, , , , , — EEa). , , , 8 , , , , . , , . , 4-)(pE a' c .:co') 'CO o, o ) p, ; o U o E, _ U C' E' Z, '' ' �^ ..-. Cl)O Q' ; ' O CNA' V NJ O ' O Co : a N, C ' , Y `Z 7 E. OQ' aaya d -OO (0' FH `' ' C. a) , 05 Nr Ih tw ' o O ' ; y, M cn oO c m a, ' a, '� a, T t v_ 4 ' a' v $ 'o' .5 E a' @. .? o M •o O 5 N' ° 2, , of , ` Z y, o, ° 3 m, cry c' a) - c' CO ° •6 u? a",-4..' CO ° a' m m Z O o c' v' ' a a E. '0, C) N' a ' Q, a c, a) m' a a 07 a' a -cc . C a' C' ,-' 0 N J co' E' N' , `_' tl> • o' ' a• �, ' C' V' .y >' H r c Q ,' o 5 ' 0' I, co a� L NO'1 a N' L a O J Q (.0 O' O' V 3' ' pC a' �' ` a C 3 O co, V' a' a U C O. O, a' N' T S Q' ' .' F. V' •O' <.> <0' N' N O O' a a) C 7• U' a a' �' O' N' �• �• 3 > a' •,�'' Y N .N J !n o" , a' O. a. a. -' C. C. ' p. , - , , C, O. Q' "' a' f6' 0. o, 'o' o. Q. a 2. to '°, a p) p' a> N _ O 5 , E' d °' O a> ' -' a' a o y' 0 y, m, , Y' c' c a o. ' `o'. m -. cE. 5' c' 3' a E a t ia. 3, w. 3 •c E U Q E. ; a), c, a :° m'' a a%' w' '. v, a CU; 'a ate); a' c a' 6'' co, 6' y, -c, a0, o w °' a 3, °' q -, i w o CO 'c �i' u; u) <c 3; 3. a' 0 �, �, �' '0, w' 3` a' m o a a) 0 a W o, 3'' :J' a' a' °'' 0 p• a aO, -p, , > ,- -p > •.' ..' V. O, O, 1' a O ' 45, a �'. 3' a' o L' Z a J n a' Lp, a' V. 'O. '�, d' °' N' O �7. CD p. f0, �, O' O`a' 2 a' a -. (2) 0'0. °' a.. E' O) 0' -C O 0 a C O' CO p, V = uJ =' a, a a O) N' ' a N N' a t_ a' co a <0 <6 N. a. cc a). p' a. `6C U 3. N. fy N p, N, c t' Lc_ a a '. a, o' o, a. 3, a. co f6. . .c. C oi O' a. 0 3 N -. - p. a @ -O ' _, C, -p, -a, o. a N rn a' C' ' a a N' v; x w a> •a> a 3' C V' " C Cr Or a`). c C <0' ) d a Y' p 3' o, O, a' a> , C LL _ o, a' .a -o V U , C' <0' a -0' ' .a L-. a) •y. 0 a o .N 0 t 3 a V. O, N .0 O a' c'' ..C.' , c' U c, N N N a, a -C, c c , a' ,, <0 tp N o c � a' E. �' v' 3 ° o a a m °' a' a = a ° a , a' a . . ' a' 7. 3. a a O �, -, a a' E' v; a .. .. a E ' z C' w c' a' $ O' o' a), <a S te a, o' o' a' 0 o o, 3' o) a v, a r' os va a)Lii Lu 3. C, o ' 0. C' aa))' 15 fl2 4 • o a' aa), c v a a aEi, aa), co, 3' co' a, �, �' co, v a v o c a0' a0; t°, ° ° 0.) a0 CO 0' a), o, a z; aJ, n - ' <nw0, O' aa, U. �, < a U <nUU; 00Q, '~ Q 0 m; CO 0, 5 2, a0, u), co, 0, a cn O '— N CO a u) CO CO O) O n- N M 7 u) CO n CO O) O N CO e7 CO CO r CO a) p N CO a u1 CO r CO a) ,- ,- ,- r' ,- N N N N N N N N N N CO CO CO CO CO CO CO CO CO CO 0 no r- N Cl) g. oC CN ) o 0) o c V O ° a oO N a --- as 0O O N ILI O R NC co N a°) N N a O 0 O J o m 0 W olV < a < 5 0 Q a yy a Q Eli 10