Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout167-0691a. Well Status:Oil SPLUG Other Abandoned Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Exploratory GINJ WINJ WDSPL No. of Completions: _0 Service Stratigraphic Test 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: Aband.: 3. Address: 7. Date Spudded: 15. API Number: 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: Top of Productive Interval: 9. Ref Elevations: KB: 17. Field / Pool(s): GL: N/A BF: N/A Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- y- Zone- 4 TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- y- Zone- 4 5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic information per 20 AAC 25.050 92 (ft MSL) 22.Logs Obtained: N/A 23. BOTTOM 36"259 20" B 647 13-3/8"1,955 9-5/8" S-95, 80 10,410 24. Open to production or injection? Yes No 25. 26. Was hydraulic fracturing used during completion? Yes No DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. Date First Production: Method of Operation (Flowing, gas lift, etc.): Hours Tested: Production for Gas-MCF: Test Period Casing Press: Calculated Gas-MCF: Oil Gravity - API (corr): Press. 24-Hour Rate If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date perf'd or liner run): ACID, FRACTURE, CEMENT SQUEEZE, ETC. CASING, LINER AND CEMENTING RECORD List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion, TUBING RECORD 95643-1/2" BOTTOM Surf 40#, 43.5#, 47# Surf Surf 647 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Hilcorp Alaska, LLC WAG Gas 10/9/2022 167-069 / 322-358 50-733-20058-00-00 S MGS Unit 07 ADL0018746 690' FSL, 1880' FWL, Sec 35, T8N, R13W, SM, AK N/A 11/2/1967 10,750 / 10,426 Surface 100 3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503 229325.9615 2463861.678 N/A 1516' FNL, 1764' FWL, Sec 2, T7N, R13W, SM, AK CASING WT. PER FT.GRADE 1/16/1968 CEMENTING RECORD N/A N/A SETTING DEPTH TVD 2461659.4824 TOP HOLE SIZE AMOUNT PULLED N/A 229161.2075 TOP SETTING DEPTH MD suspension, or abandonment; or within 90 days of acquisition of the log, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page only if necessary. N/A Surf Surf Per 20 AAC 25.283 (i)(2) attach electronic information 54.5# 10,734 Surf Surf 85# 259 Surf 1,988 SIZE DEPTH SET (MD) N/A PACKER SET (MD/TVD) Flow Tubing N/A N/A Gas-Oil Ratio:Choke Size: Sr Res EngSr Pet GeoSr Pet Eng Middle Ground Shoal / E,F and G Oil, Middle Grnd Shoal Oil N/A Oil-Bbl: Water-Bbl: Water-Bbl: PRODUCTION TEST N/A Date of Test: Oil-Bbl: Form 10-407 Revised 10/2022 Due within 30 days of Completion, Suspension, or Abandonment By James Brooks at 11:09 am, Nov 08, 2022 Abandoned 10/9/2022 JSB RBDMS JSB 111422 xGDSR-11/16/22BJM 11/9/23 SFD 11/16/2022 Conventional Core(s): Yes No Sidewall Cores: 30. MD TVD N/A N/A N/A N/A Top of Productive Interval N/A N/A N/A N/A 31. List of Attachments: Wellbore schematic, Well operations summary 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Aras Worthington Digital Signature with Date:Contact Email:Aras.Worthington@hilcorp.com Contact Phone:907 564-4763 Operations Manger General: Item 1a: Item 1b: Item 4b: Item 9: Item 15: Item 19: Item 20: Item 22: Item 23: Item 24: Item 27: Item 28: Item 30: Item 31: Formation Name at TD: If Yes, list formations and intervals cored (MD/TVD, From/To), and briefly summarize lithology and presence of oil, gas or water (submit separate pages if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071 no matter when acquired. Yes No Well tested? Yes No 28. CORE DATA If Yes, list intervals and formations tested, briefly summarizing test results for each. Attach separate pages if needed and submit detailed test info including reports and Excel or ASCII tables per 20 AAC 25.071. NAME Permafrost - Top Permafrost - Base 29. GEOLOGIC MARKERS and POOL BOUNDARIES: (list all encountered) FORMATION TESTS Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion, suspension, or abandonment; or 90 days after log acquisition, whichever occurs first. Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Authorized Title: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a current well schematic diagram with each 10-407. Submit 10-407 and attachments in PDF format to aogcc.permitting@alaska.gov. All laboratory analytical reports from a well must be submitted to the AOGCC, no matter when the analyses are conducted per 20 AAC 25.071. Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, as-built, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. TPI (Top of Producing Interval). Authorized Name and INSTRUCTIONS Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Digitally signed by Dan Marlowe (1267) DN: cn=Dan Marlowe (1267), ou=Users Date: 2022.11.08 10:36:12 -09'00' Dan Marlowe (1267) Size Type Wt/Grade/Conn I.D. Top Shoe Cmt sx TOC 36" Structural ? ? Surf 259' Drive n/a 20" Conductor 85# "B" 19.186" calc Surf 647 1,200 calc. surf 13-3/8" Surface 54.5# 12.459" Surf 1,988.22' 1,200 sx Calc 655' 9-5/8" Production 40, 43.5, 47, S-95,80 ST&C/Butt USS Surf 10,734' 1,550 sx 7,303' CBL 20” shoe 647’ TD is 9Û @ 6,788’ MD MSL RKB 102’ 118’ 34’RKB - Tbg Hgr Lease: SMGS 18746 Well: Di-07 API #: 50-133-20058-00 PTD: 167-069 Leg 2, Slot 4 Casing Detail JLL 10/27/22 13-3/8” shoe 2,010’ 18϶ PBTD = 10,675’ MD & 10,351’ TVD TD = 10,750’ & 10,425’ TVD @ 15° Max Hole angle = 19.8ȗ @ 9,209’ MD Top Btm 9,785 10,424' Comments Perforation information: All perfs isolated by Baker CI Bridge Plug at 9,571' MD. Depth Length I.D. O.D. 34.15' 9,564' 3-1/2" 9,571' Buttress 9.2# N-80, w/ ABC couplings Other Description Cameron 10" sigle donut hanger Baker CIBP Completion: 3-1/2", 9.2#, N-80 Jewelry Detail BP @ 9,571’ Csg rollered tight spot @ 9,772’ 6-3/4” tight spot @ 9,791’ 9-5/8” shoe 10,734’ Perfs 9785’ – 10424’ NOTES: No access to tree w/blind flange on top of single master valve. Collapsed casing below bridge plug at 9571’. No Eline/Slickline work since tubing ran in 1985. 8/2011 – Well circulated with 9.8 ppg brine. Confirmed packer is holding. Well Dead. Freeze protected w/diesel. CBL TOC @ 7303’ OOA TOC tagged 1” below outlet valve G&G Oil Top @ 5670’ Cement Plug #1 Tubing: TOC tagged @ 3527’ SLM – 9564’ MD IA: Est. 3,000’ MD – 9564’ MD 9.8 ppg brine Tbg x IA: 400’ – Est. 3,000’ MD Cement Plug #2 pumped through perforations @ 400’ MD TxIAxOA: Surface – 400’ MD OOA: Cemented to surface and squeezed from 400’ MD to surface Tag cmt in tbg @ 3527’ SLM Rig Start Date End Date SL 8/7/22 10/9/22 08/08/22 - Monday Pump down Tubing out IA circulating FIW checking & capturing 9.8 brine for cmt plugging. Weight up as needed. 08/07/22 - Sunday PTSM, R/d move circ lines to Di-07 Tubing & IA, check pressures, T-0, IA-0. Rev circ out to clean fluid, 3.6 bbls, pump down tubing out IA till recovering good 9.8 brine, 14bbls. Daily Operations: Hilcorp Alaska, LLC Well Operations Summary API Number Well Permit NumberWell Name S MGS Unit 07 50-733-20058-00-00 167-069 Held PJSM with crews, pump 93 bbls oily water injecting into D-17 well at 3.5 bpm ICP pressure at 2300 FCP AT 2800. Halliburton Break circulation with 5 bbl. mud push, test lines to 1000 psi & 3000 psi, (good), pump 20 bbl. of Mud push II at 3 bpm, swap over to rig pump pumping 186 bbl. of 9.8 ppg brine at 3.5 bpm ICP AT 6.30 psi FCP at 430 psi, holding 200 psi back pressure on choke. Halliburton mixed and pump 464 bbl. of class G cmt 1675 sxs, mixed at 14.0 ppg with 1.56 yld 8.08 gal/sxs mix water total 322 bbls. pumped at 5 bpm @ 125. Psi holding 400 to 500 psi back pressure on choke, launch nerf ball and displace with 26 bbls of 9.8 brine. Shut down pump with 450 psi on tbg and 250 on IA. bleed off tbg pressure to "0" IA bleed down to 110 psi, Bleed off IA to "0" well static, had full return during job. Cmt in place at 14:05 hrs. Perform static sheen test on cmt clean up excess (no sheen) wash up unit and clean up, total gallons; excess cmt discharged 1472, no sheen. Calculated displacement 515 bbls, total returns to returns tank 530 bbls. Rig up and line up to inject excess water from DI -07 cmt job into DI - 17 well. Pump 320 bbls of oily water at 3.5 bpm at 2300 psi. Halliburton mixing HR5 water for next job. Change o- ring on swab on fluid pump, and test pump OK. 08/13/22 - Saturday PJSM. Attempt to pump from H1 holding tank with Yellow jacket pump injecting fluid in DI 17. Packing leaking on cylinder on fluid, call out mechanic. Offload cmt pods and blow into silos. Blow lines and rig up Hilcorp pump, prime rod oiler pumping injecting oily water into DI-17 at 1-1/4 bpm at 2500 psi holding 2200 on IA pump 315 bbls =, pop off blew, shut down pump remove pop off from pump and reset same. Yellow jack mechanic arrived, working on Yellow pump changing cylinder gland nut and seals, test run pump got to 2500 psi at 3.5 bpm cylinder started leaking, trouble shoot cylinder, got spare parts out, rebuild cylinder, test run pump, pumped 50 bbls at 3.5 bpm at 2800 psi. 08/11/22 - Thursday Mobe cmt pods to location, and off load same. Blow into silo's and back load pods on to work boat. Prep for cmt job. 08/12/22 - Friday displace with 26 bbls of 9.8 brine. Halliburton mixed and pump 464 bbl. of class G cmt 1675 sxs, mixed at 14.0 ppg w Rig Start Date End Date SL 8/7/22 10/9/22 Daily Operations: Hilcorp Alaska, LLC Well Operations Summary API Number Well Permit NumberWell Name S MGS Unit 07 50-733-20058-00-00 167-069 08/29/22 - Monday Service and warm eq. R/u circulating lines and test eq. fluid packed well. PT lines to 2500psi. Wait on State Inspector, Heliport on Weather hold. Crew performed housekeeping. Service and grease circulating valves. Okay to tag TOC without witness. R/u SL, RIH w/1.75" DD Bailer tag TOC @ 3527' w/t POOH. Recover wet cement. R/d SL. 08/30/22- Tuesday Held PJSM, approve PTW Service and warm eq. R/u circulating lines and test eq. fluid packed well. Di-07, R/u circulating lines and test eq. fluid packed well. CMIT-TxIA t/ 2500psi per Sundry, MIT Failed, witness by State Inspector Sean Sullivan Pretest: T/IA/OA/OOA=0/0/10/0 BBL Pump: 2.25 Initial: T/IA/OA/OOA=2857/2857/125/0 15mis: T/IA/OA/OOA=2795/2795/118/0 30mins: T/IA/OA/OOA=2750/2750/115/0 45mins: T/IA/OA/OOA=2712/2712/112/0 60mins: T/IA/OA/OOA=2678/2678/109/0 BBL Return: 1.75 08/31/2022 - Wednesday Held PJSM, approve PTW Service and warmed eq. R/u lines and test eq. on Tbg, Pressure up on Tbg and recorded pressures: Initial=2703psi, 5mins=2679psi, 10mins=2664psi,15mins=2664psi,20mins=2642psi, 25mins=2633psi, 30mins=2626psi. R/u lines and test eq. on IA, Pressure up on IA and recorded pressures: Initial=2662psi, 5mins=2635psi, 10mins=2615psi, 15mins=2598psi, 20mins=2582psi, 25mins=2571psi, 30mins=2560psi. R/d test eq. CMIT-TxIA t/ 2500psi per Sundry, MIT Failed, r tag TOC @ 3527' w/t POOH. Recover wet cement. Rig Start Date End Date SL 8/7/22 10/9/22 Daily Operations: Hilcorp Alaska, LLC Well Operations Summary API Number Well Permit NumberWell Name S MGS Unit 07 50-733-20058-00-00 167-069 09/18/22 - Sunday 09/10/22 - Saturday CMIT- LS x SS x IA to 2500 psi as per Sundry Pretest : LS / SS / IA / OA / OOA = 19 / NA / 19 / 45 / 0 BBL pumped 1.5 Initial : LS / SS / IA / OA / OOA = 2812 / NA / 2812 / 155 / 0 15 min = LS / SS / IA / OA / OOA = 2754 / NA / 2754 / 95 / 0 30 min = LS / SS / IA / OA / OOA = 2724 / NA / 2724 / 80 / 0 45 min = LS / SS / IA / OA / OOA = 2700 / NA / 2700 / 70 / 0 bleed back 1.5 bbls AOGCC Brian Bixby witness test Mobe e-line crews to platform & orientate. R/U e-line. RIH with 1-11/16 tool string wt bars, CCL, 2" gun loaded 5' production charges, 6.5 grams, 6 shots per ft. Total of 30 shots. Locate collars at 415' & 385', spot CCL at 396 ft. 4' to top shot perf interval 400 ft to 405 ft. fired shots pooh all shots fired. Rig down E-line.top shot perf interval 400 ft to 405 ft. fired shots pooh all shots fired. Rig Start Date End Date SL 8/7/22 10/9/22 Daily Operations: Hilcorp Alaska, LLC Well Operations Summary API Number Well Permit NumberWell Name S MGS Unit 07 50-733-20058-00-00 167-069 Rigged up to pump cement down DI-08 OA, IA and short string. Took returns up Long string of Di-08 and pumped Into Di-06 Tubing taking returns up Di-06 OA and OOA into Di-07 IA, OA and up production tubing to return tank. Hold pre job safety meeting. Pumped 5 bbls ahead. Shut in and PT lines 250/3500 psi. Online to establish returns. Pump 2x bottoms up of 207 bbls. Total 300 bbls of FIW followed by 110 bbls of mudd push. Pressured up all OOA's to 500 psi. Di-07 and Di-08 didnt have communication. Di-06 had communication on the OOA. Mixed mudd flush and pumped 110 bbls. Cement wet 2000 hrs. Pumped 250 bbls of cement. Returns to surface good cement at 207 pumped. Pumping down Di-08, up Di-06 and out Di-07. After cement to surface close all valves and work cement through each annuli and confirm cement returns to surface through bleed/sample port. Pump cmt down Di-8 SS, IA, OA. Return up Di-08 LS. After 53 bbls pumped confirmed cement returns at LS with sample port. Start to isolate annuli one at a time and confirmed cement returns at return line or LS sample port. All annuli cemented in Di-08 Di-08 Cemented Continue pumping cement from LS of Di-08 into tubing of Di-06. 102 bbls or 155 total pumped close in OA valve and confirm cement at surface in OOA sample port. Open OA valve close OOA valve and confirm cement at surface with sample port. Checked IA valve with no flow. IA previously cemented off. Di-06 OA return lined tied into Di-07 OA. Di-06 OOA tied into Di-07 IA. Di-07 OOA no communication Pump cement in Di-07 through IA and OA lines. Pump 53 bbls or 209 total bbls pumped. Cement returns at surface near a bbl or two of calculated displacement. Continue with an additional 40 bbls of excess cement. Isolate IA valve and cement up OA good returns at surface. Open IA valve and Isolate OA valve . Good cement returns at surface. Shut down. Ensure all Valves are open except Di-6 OOA valve. Pressure up on all annuli to 500 psi. No break over. Attempting squeezes on OOA. Shut in wellhead valves with 488 psi SITP. Total cement pumped 250 bbls. Di-08, Di-06, Di-07 all cemented in one pump job. Clean up pump and lines to cuttings box. No overboard. 10/09/2022 - Sunday Pumping down Di-08, up Di-06 and out Di-07. En Open IA valve and Isolate OA valve . Good cement returns at surface. Di-08, Di-06, Di-07 all cemented in one pump job. C Pumped 250 bbls of cement. Returns to surface good cement at 207 pumped. Isolate IA valve and cement up OA good returns at surface. Rigged up to pump cement down DI-08 OA, IA and short string. Took returns up Long string of Di-08 and pumped Into Di-06 Tubing taking returns up Di-06 OA and OOA into Di-07 IA, OA and up production tubing to return tank. Di-06 OA return lined tied into Di-07 OA. Di-06 OOA tied into Di-07 IA. Di-07 OOA no communication Pump cement in Di-07 through IA and OA lines. Cement returns at surface near a bbl or two of calculated displacement. Continue with an additional 40 bbls of excess cement. After cement to surface close all valves and work cement through each annuli and confirm cement returns to surface through bleed/sample port. Pump cmt down Di-8 SS, IA, OA. Pressure up on all annuli to 500 psi. No break over. Attempting squeezes on OOA. Pump 53 bbls o From:McLellan, Bryan J (OGC) To:Aras Worthington Cc:Regg, James B (OGC) Subject:RE: Dillon P&A Witnessed MITs Date:Monday, September 19, 2022 5:47:00 PM Aras, Hold off on the Dillon 13 shallow P&A for now. It looks like I spoke to soon. This one was deemed inconclusive and will require a re-test. Bryan McLellan Senior Petroleum Engineer Alaska Oil & Gas Conservation Commission 333 W 7th Ave Anchorage, AK 99501 Bryan.mclellan@alaska.gov +1 (907) 250-9193 From: McLellan, Bryan J (OGC) Sent: Friday, September 16, 2022 4:39 PM To: Aras Worthington <Aras.Worthington@hilcorp.com> Cc: Regg, James B (OGC) <jim.regg@alaska.gov> Subject: RE: Dillon P&A Witnessed MITs Aras, Jim and I have reviewed the Inspector’s reports and agree that the following wells meet at least one of the two following criteria, and Hilcorp can therefore continue with the sundried P&A work on these wells: 1. <10% pressure loss over 30 minutes and pressure loss trending toward zero. 2. <2.5% pressure loss over 30 minutes. D-03 D-07 D-08 D-12 D-13 D-14 D-15 Well D-04 did not meet these criteria and will need something else done before moving up hole for the surface plug. Regards Bryan McLellan Senior Petroleum Engineer Alaska Oil & Gas Conservation Commission 333 W 7th Ave Anchorage, AK 99501 Bryan.mclellan@alaska.gov +1 (907) 250-9193 From: Aras Worthington <Aras.Worthington@hilcorp.com> CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. Sent: Monday, September 12, 2022 1:22 PM To: McLellan, Bryan J (OGC) <bryan.mclellan@alaska.gov> Subject: Dillon P&A Witnessed MITs Bryan, I understand you are in an all-day-meeting today. Below is a summary of each of the witnessed MITs we performed this last weekend. I took these numbers straight from the digital data files (I can send those too as needed). Give a call anytime if you’d like to discuss or would like the full data files, or any other information. We would like to proceed with the P&A completion on all of these wells, which typically means the perforating @ ~400’ MD and circulating in the surface cement plug. Please advise if we can proceed with these P&As. We are ready to do so. Thanks and Best Regards, Aras Worthington Hilcorp Alaska LLC Senior Technical Advisor for Alaska Operations, PE Aras.worthington@hilcorp.com 907-564-4763 907-440-7692 mobile Di-03: Time (Hrs:Mins)Pressure (psi)Pressure loss per 15 minutes (psi) Pressure loss as a % of total pressure 00:02 2840 00:17 2726 114 4 00:32 2655 71 2.6 00:47 2597 58 2.2 Total pressure loss/last 30 minutes 129 Total pressure-loss for last 30 mins is 129 psi, less than 10% pressure-loss. Pressure loss per 15-minute interval is consistently less than the previous 15-minute interval and the percentage of pressure-loss of each interval is less than the previous interval. This verifies a stabilizing pressure trend and therefore a passing MIT. Di-04: Time (Hrs:Mins)Pressure (psi)Pressure loss per 15 minutes (psi) Pressure loss as a % of total pressure 00:04 2816 00:19 2679 137 4.9 00:34 2581 98 3.6 00:49 2497 84 3.2 Total pressure loss/last 30 minutes 182 Total pressure-loss for last 30 mins is 182 psi, less than 10% pressure-loss. Pressure loss per 15-minute interval is consistently less than the previous 15-minute interval and the percentage of pressure-loss of each interval is less than the previous interval. This verifies a stabilizing pressure trend and therefore a passing MIT. Di-07: Time (Hrs:Mins)Pressure (psi)Pressure loss per 15 minutes (psi) Pressure loss as a % of total pressure 00:03 2840 00:18 2756 84 2.9 00:33 2726 30 1.1 00:48 2701 25 0.9 Total pressure loss/last 30 minutes 55 Total pressure-loss for last 30 mins is 55 psi, less than 10% pressure-loss. Pressure loss per 15-minute interval is consistently less than the previous 15-minute interval and the percentage of pressure-loss of each interval is less than the previous interval. This verifies a stabilizing pressure trend and therefore a passing MIT. Di-08: Time (Hrs:Mins)Pressure (psi)Pressure loss per 15 minutes (psi) Pressure loss as a % of total pressure 00:05 2788 00:20 2608 180 6.4 00:35 2528 80 3.1 00:50 2472 56 2.2 Total pressure loss/last 30 minutes 136 Total pressure-loss for last 30 mins is 136 psi, less than 10% pressure-loss. Pressure loss per 15-minute interval is consistently less than the previous 15-minute interval and the percentage of pressure-loss of each interval is less than the previous interval. This verifies a stabilizing pressure trend and therefore a passing MIT. Di-12: Time (Hrs:Mins)Pressure (psi)Pressure loss per 15 minutes (psi) Pressure loss as a % of total pressure 00:05 2781 00:20 2578 203 7.3 00:35 2479 99 3.8 00:50 2414 65 2.6 Total pressure loss/last 30 minutes 164 Total pressure-loss for last 30 mins is 164 psi, less than 10% pressure-loss. Pressure loss per 15-minute interval is consistently less than the previous 15-minute interval and the percentage of pressure-loss of each interval is less than the previous interval. This verifies a stabilizing pressure trend and therefore a passing MIT. Di-13: Please note that only 30 mins of data were recorded. The MIT pressure-up started at about 30- minutes into the data file. We did not run this test out 45 minutes like the others. Time (Hrs:Mins)Pressure (psi)Pressure loss per 15 minutes (psi) Pressure loss as a % of total pressure 00:30 2695 00:45 2612 83 3.1 1:00 2551 61 2.3 Total pressure loss/last 30 minutes 144 Total pressure-loss for last 30 mins is 144 psi, less than 10% pressure-loss. Pressure loss per 15-minute interval is consistently less than the previous 15-minute interval and the percentage of pressure-loss of each interval is less than the previous interval. This verifies a stabilizing pressure trend and therefore a passing MIT. Di-15: Time (Hrs:Mins)Pressure (psi)Pressure loss per 15 minutes (psi) Pressure loss as a % of total pressure 00:12 2808 00:27 2755 53 1.9 00:42 2712 43 1.6 00:57 2675 37 1.4 Total pressure loss/last 30 minutes 80 Total pressure-loss for last 30 mins is 80 psi, less than 10% pressure-loss. Pressure loss per 15-minute interval is consistently less than the previous 15-minute interval and the percentage of pressure-loss of each interval is less than the previous interval. This verifies a stabilizing pressure trend and therefore a passing MIT. The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section: 35 Township: 8N Range: 13W Meridian: Seward Drilling Rig: N/A Rig Elevation: N/A Total Depth: 10750 ft MD Lease No.: ADL 0018746 Operator Rep: Suspend: P&A: XXX Conductor: 20" O.D. Shoe@ 647 Feet Csg Cut@ Feet Surface: 13 3/8" O.D. Shoe@ 1988 Feet Csg Cut@ Feet Intermediate: O.D. Shoe@ Feet Csg Cut@ Feet Production 9 5/8" O.D. Shoe@ 10734 Feet Csg Cut@ Feet Liner O.D. Shoe@ Feet Csg Cut@ Feet Tubing: 3 1/2" O.D. Tail@ 9564 Feet Tbg Cut@ Feet Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified Pre-Test Initial 15 min 30 min 45 min Result Tubing 19 2812 2754 2724 2700 IA 19 2812 2754 2724 2700 OA 45 155 95 80 70 OOA 0 0 0 0 0 Remarks: Attachments: Howard Hooter Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): I Tubing string was twinned in with the IA for the test. Pressure loss was -58 psi / -30 psi / -24 psi. I told the company rep that town would make the pass-fail call. 1.5 bbls in, 1.5 bbls out. September 10, 2022 Brian Bixby Well Bore Plug & Abandonment S MSG UNIT 07 Hilcorp Alaska LLC PTD 1670690; Sundry 322-358 Test graph Test Data: Casing Removal: rev. 11-28-18 2022-0910_Plug_Verification_SMGS_Di-07_bb 7HVWUHVXOWFKDQJHGWR3$66FRQVLGHULQJODVWPLQRI WHVW3UHVVXUHORVVGXULQJWKDWLQWHUYDOZDVOHVVWKDQ -5HJJ$2*&&,QVSHFWLRQ6XSY 3 James B. Regg Digitally signed by James B. Regg Date: 2022.09.20 13:08:28 -08'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section: 35 Township: 8N Range: 13W Meridian: Seward Drilling Rig: N/A Rig Elevation: N/A Total Depth: 10750 Lease No.: ADL0018746 Operator Rep: Suspend: P&A: X Conductor: 20" O.D. Shoe@ 647 Feet Csg Cut@ Feet Surface: 13 3/8 O.D. Shoe@ 1988 Feet Csg Cut@ Feet Intermediate: O.D. Shoe@ Feet Csg Cut@ Feet Production: 9 5/8" O.D. Shoe@ 10734 Feet Csg Cut@ Feet Liner: O.D. Shoe@ Feet Csg Cut@ Feet Tubing: 3 1/2" O.D. Tail@ 9564 Feet Tbg Cut@ Feet Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified Fullbore Bridge plug 3527 ft Wireline tag Initial 15 min 30 min 45 min Result Tubing 2850 N/A IA 125 N/A OA 0 N/A Initial 15 min 30 min 45 min 60 min Result Tubing 2857 2795 2750 2712 2678 IA 2857 2795 2750 2712 2678 OA 125 118 115 115 109 Remarks: Attachments: Wade Hudgens F Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): 36-inch structural pipe set to 259 ft MD. 200 lb Tool string consisted of rope socket, knuckle joint, 2x 45 lb weight bars, hydraulic spangs (spangs/bailer when sampling). First MIT stopped short due to leaking bull plug, bleed down, and tighten. Retest (Fail) - pressure loss does not meet AOGCC stabilization criteria. Sample wet cement August 30, 2022 Sully Sullivan Well Bore Plug & Abandonment SMGS Unit 07 Hillcorp Alaska LLC. PTD 1670690; Sundry 322-358 none Test Data: F Casing Removal: rev. 11-28-18 2022-0827_Plug_Verification_SMGS_Di-07_ss 9 9 9 9 IW0' gp j gy First MIT stopped short due to leaking bull plug, bleed down, and tighten. Retest (Fail) -pg(pg pg) pressure loss does not meet AOGCC stabilization criteria. pp James B. Regg Digitally signed by James B. Regg Date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a   U\ 6WDWX )RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO By Samantha Carlisle at 3:27 pm, Jun 14, 2022  'LJLWDOO\VLJQHGE\'DQ0DUORZH  '1FQ 'DQ0DUORZH   RX 8VHUV 'DWH  'DQ0DUORZH  )OXVK 2$ DQG 22$ ZLWK DW OHDVW [ %RWWRPV XS EHIRUH FHPHQWLQJ ; %-0  ; '65'/%  3URYLGH  KUV QRWLFH IRU $2*&& RSSRUWXQLW\ WR ZLWQHVV FHPHQW WRS WDJ LQ WEJ DQG &0,7 7[,$ WR  SVL GWV  Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2022.08.05 10:46:25 -08'00' RBDMS JSB 080822 3 $6XQGU\ :HOO'L 37' tĞůůEĂŵĞ͗^D'^hE/d;ŝůůŽŶͿϬϳ W/EƵŵďĞƌ͗ϱϬͲϳϯϯͲϮϬϬϱϴͲϬϬͲϬϬ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗^ŚƵƚͲ/ŶWƌŽĚƵĐĞƌ ZŝŐ͗^>͕>͕& ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗:ƵůLJϮϬϮϮ ƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϭŵŽŶƚŚ ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗:ƵĂŶŝƚĂ>ŽǀĞƚƚϳϳϳͲϴϯϯϮ ZĞŐ͘ƉƉƌŽǀĂůZĞƋ͛Ě͍zĞƐͲϰϬϯ &ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗ƌĂƐtŽƌƚŚŝŶŐƚŽŶ ϵϬϳͲϱϲϰͲϰϳϲϯ;KͿ ^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗<ĂƚŚĞƌŝŶĞK͛ĐŽŶŶŽƌ ϵϬϳͲϳϳϳͲϴϯϳϲ;KͿ ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ;ĞƐƚͿ͗ϰϯϴϮƉƐŝΛϵϴϮϱ͛ds ;ĐĂ͘ϮϬϬϱͿ DĂdžŝŵƵŵdžƉĞĐƚĞĚ,W͗ϰϰϬϬƉƐŝ DĂdžŝŵƵŵWŽƚĞŶƚŝĂů^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ ΕϯϰϮϬƉƐŝ 'ĂƐŽůƵŵŶ'ƌĂĚŝĞŶƚ;Ϭ͘ϭƉƐŝͬĨƚͿ ƵƌƌĞŶƚWƌĞƐƐƵƌĞƐ;d;>^Ϳͬd;^^Ϳͬ/ͬKͬKKͿ͗ϬͬϬͬϬͬϮϬͬϬ +LVWRU\ 'ULOOHGLQDQGFRPSOHWHGDVDQRLOZHOODV6RXWK0LGGOH*URXQG6KRDO8QLW1R ,WZDVZRUNHGRYHUWZLFHLQDQGFRQYHUWHGWRDZDWHULQMHFWLRQZHOOLQ 6XEVHTXHQWZRUNRYHUVZHUHSHUIRUPHGLQDQGWRFKDQJHRXWWKH WXELQJDFLGL]HUHSHUIRUDWHDQGILQDOO\WRVZDJHRXWFDVLQJ 7KHZHOOZDV6KXW,QLQ ,QWKH7[,$ZDVFLUFXODWHGWRSSJEULQH 3UH3 $ZRUNFRPSOHWHG x 'ULIWHG7EJZ´*5WR¶WDJ&,%3 x %OHG2$DQG22$WRIURPSVLWRSVL2$SUHVVXUHEXLOWWRSVLLQKUV x ,QMHFWLYLW\WHVWLQWR22$WRSVL,QMHFWEEOVLQPLQV x ,QMHFWLYLW\WHVWLQWR2$WRSVL,QMHFWEEOVLQPLQV x &LUFXODWH7EJ[,$ESP#SVL x 377EJ[,$WRSVL±SDVV x 6HW+ROHILQGHU#¶6/037WEJWRSVLIRUPLQV±SDVV &XUUHQW6WDWXV 6KXWLQ3HUIRUDWLRQVDUHLVRODWHGZLWKDEULGJHSOXJVHW#¶0'DQGWKH7XELQJDQG,$DUH ORDGHGZLWKSSJ.:)3UH3 $GLDJQRVWLFVLQGLFDWHWKDWWKHWXELQJ&,%3DQG´FDVLQJ KDYHLQWHJULW\7KH´DQG´FDVLQJVERWKEOHHGRIISUHVVXUHRQDSUHVVXUHWHVW PRVW OLNHO\WKURXJKWKHVKRHVZKLFKDUHRSHQWRIRUPDWLRQ EXWWKHLQMHFWLYLW\LVYHU\ORZVRWKHUHLV FRQILGHQFHWKH\ZLOOKROGWKHVXUIDFHFHPHQWSOXJZKLOHFHPHQWVHWVXS 2EMHFWLYH 3OXJDQGDEDQGRQWKHZHOOWRVXUIDFH 3 $6XQGU\ :HOO'L 37' +LOFRUSUHTXHVWVDYDULDQFHWR$$& F    ( +LOFRUSUHTXHVWVWKHH[LVWLQJEULGJH SOXJ#¶0'WREHXVHGLQSODFHRIDPHFKDQLFDOEULGJHSOXJDWDVHWKHLJKWRIIHHW DERYHWKHH[LVWLQJWRSSHUIRUDWHGLQWHUYDO&HPHQWZLOOEHSODFHGDERYHWKHEULGJHSOXJLQWKH 7XELQJ[,$7KHEDVHRIWKHSURSRVHG3 $SOXJLVDW¶0'7KHUHLVRQO\RQH3RRO EHWZHHQWKDWGHSWKDQGWKHWRSRISHUIRUDWLRQVDW¶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¾ EEOV5,: 5DZ,QOHW:DWHU Z6XUIDFWDQW:DVK GRZQ7XELQJDQGRXW,$ ¾ EEOVSSJEULQH EULQHYROXPHIURP¶WRVXUIDFHLQ,$ ¾ EEOVSSJ&ODVV*FHPHQW GRZQ7XELQJDQGRXW,$ 5HFRUG YROXPHRIIOXLGUHFRYHUHG ¾ )RDP:LSHU%DOO ¾ EEOVRISSJEULQHGLVSODFHPHQWRIFHPHQW SXWV72&LQ7XELQJ#a¶ HTXLYDOHQWZLWK,$ ¾ 7XELQJYROXPHIURP7XELQJ7DLOWR¶ESI  ¶¶  EEOV ¾ ,$YROXPHIURP7XELQJ7DLO¶ESI  ¶¶  EEOV 7RWDO&HPHQW9ROXPHEEOV ¾ 7XELQJYROXPHIURP¶WRVXUIDFHESI ¶ EEOV ¾ ,$YROXPHIURP¶WRVXUIDFHESI¶ EEOV )XOOERUH6OLFNOLQH  &0,7/6[66[,$WRSVL $2*&&:LWQHVVHG   7DJ72&LQ/6 $2*&&:LWQHVVHG   3HUIRUDWH/6´&DVLQJDQG´FDVLQJ#a¶0' )XOOERUH  9HULI\FLUFXODWLRQGRZQ7XELQJRXW22$2$DQG,$  3XPS7XELQJ[22$[2$[,$VXUIDFHFHPHQWSOXJDVIROORZV ¾ EEOV5,:Z6XUIDFWDQW:DVK GRZQ/6DQGGLVSODFHEEOVHDLQWR2$ DQG22$'LVSODFHEEOVLQWR,$ ¾ EEOV5,:WRGLVSODFH6XUIDFWDQWZDVKRXWRI22$2$DQG,$ ¾ EEOVSSJ&ODVV*FHPHQW GRZQ/6DQGRXW22$ 5HFRUGYROXPH RIIOXLGUHFRYHUHG 7KLVLVH[FHVV ¾ :KHQJRRGFHPHQWUHWXUQVDUHVHHQIURP22$VZDSWRWDNLQJUHWXUQVIURP2$ ¾ :KHQJRRGFHPHQWUHWXUQVDUHVHHQIURP2$VZDSWRWDNLQJUHWXUQVIURP,$ ¾ 0L[RQWKHIO\DQGSXPSH[FHVVFHPHQWDVQHHGHGWRJHWJRRGFHPHQWUHWXUQV DFURVVDOODQQXOL 9ROXPHV ¾ 7%*IURP¶WRVXUIDFHESI ¶ EEOV ¾ 22$IURP¶WRVXUIDFHESI ¶ EEOV ¾ 2$IURP¶WRVXUIDFH ¶ EEOV ¾ ,$IURP¶WRVXUIDFHESI ¶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a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y Samantha Carlisle at 11:07 am, May 05, 2022  'LJLWDOO\VLJQHGE\'DQ0DUORZH  '1FQ 'DQ0DUORZH   RX 8VHUV 'DWH  'DQ0DUORZH  /LPLW LQMHFWLRQ LQWR WKH 2$ WR  EEOV DQG 22$ WR  EEO DIWHU OLTXLG SDFNLQJ DQQXOL  EMP ; '/%  '65  %-0   -/&  Jeremy Price Digitally signed by Jeremy Price Date: 2022.05.17 06:33:05 -08'00' RBDMS SJC 052022 3 $6XQGU\ :HOO'L 37' tĞůůEĂŵĞ͗^D'^hE/d;ŝůůŽŶͿϬϳ W/EƵŵďĞƌ͗ϱϬͲϳϯϯͲϮϬϬϱϴͲϬϬͲϬϬ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗^ŚƵƚͲ/ŶWƌŽĚƵĐĞƌ ZŝŐ͗^>͕>͕& ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗DĂLJϮϬϮϮ ƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϭǁĞĞŬ ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗:ƵĂŶŝƚĂ>ŽǀĞƚƚϳϳϳͲϴϯϯϮ ZĞŐ͘ƉƉƌŽǀĂůZĞƋ͛Ě͍zĞƐͲϰϬϯ &ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗ƌĂƐtŽƌƚŚŝŶŐƚŽŶ ϵϬϳͲϱϲϰͲϰϳϲϯ;KͿ ^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗<ĂƚŚĞƌŝŶĞK͛ĐŽŶŶŽƌ ϵϬϳͲϳϳϳͲϴϯϳϲ;KͿ ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ;ĞƐƚͿ͗ϰϯϴϮƉƐŝΛϵϴϮϱ͛ds ;ĐĂ͘ϮϬϬϱͿ DĂdžŝŵƵŵdžƉĞĐƚĞĚ,W͗ϰϰϬϬƉƐŝ DĂdžŝŵƵŵWŽƚĞŶƚŝĂů^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ ΕϯϰϮϬƉƐŝ 'ĂƐŽůƵŵŶ'ƌĂĚŝĞŶƚ;Ϭ͘ϭƉƐŝͬĨƚͿ ƵƌƌĞŶƚWƌĞƐƐƵƌĞƐ;d;>^Ϳͬd;^^Ϳͬ/ͬKͬKKͿ͗ϴϰϬͬϯϬͬϰϭϱͬϭϴͬϭϬ +LVWRU\ 'ULOOHGLQDQGFRPSOHWHGDVDQRLOZHOODV6RXWK0LGGOH*URXQG6KRDO8QLW1R ,WZDVZRUNHGRYHUWZLFHLQDQGFRQYHUWHGWRDZDWHULQMHFWLRQZHOOLQ 6XEVHTXHQWZRUNRYHUVZHUHSHUIRUPHGLQDQGWRFKDQJHRXWWKH WXELQJDFLGL]HUHSHUIRUDWHDQGILQDOO\WRVZDJHRXWFDVLQJ 7KHZHOOZDV6KXW,QLQ ,QWKH7[,$ZDVFLUFXODWHGWRSSJEULQH &XUUHQW6WDWXV 6KXWLQ3HUIRUDWLRQVDUHLVRODWHGZLWKDEULGJHSOXJVHW#¶0'DQGWKH7XELQJDQG,$DUH ORDGHGZLWKSSJ.:) 2EMHFWLYH 3UH3 $GLDJQRVWLFV 3URFHGXUDOVWHSV 6OLFNOLQH)XOOERUH  %OHHG´[´DQQXOXV 2$ 1RWHIOXLGVJDVUHWXUQHGDQGEXLOGXSUDWHDIWHU6,  %OHHGWKH´[´DQQXOXV 22$ 1RWHIOXLGVJDVUHWXUQHGDQGEXLOGXSUDWHDIWHU 6,  %OHHGWKH/666DQG,$1RWHIOXLGVJDVUHWXUQHGDQGEXLOGXSUDWHDIWHU6,  3HUIRUPFLUFXODWLRQWHVWGRZQWKH7XELQJZLWKUHWXUQVIURPWKH,$'RQRWH[FHHGD0D[ WXELQJ,$SUHVVXUHRISVL  37WKH7XELQJ[,$WRSVLIRUILYHPLQXWHV3HUIRUPLQMHFWLYLW\WHVWWRSVLLI37 IDLOV  3XPSGRZQWKH´[´ 22$ DQQXOXVDQG0,7RUHVWDEOLVKLQMHFWLYLW\0D[ SUHVVXUHSVL  3XPSGRZQ´[´ 2$ DQQXOXVZLWKGLHVHOWRHVWDEOLVKLQMHFWLYLW\0D[ SUHVVXUHSVL  'ULIW 7DJWXELQJ  6HW' '3DFNRII RUVLPLODU LQWXELQJ#a¶0'37WXELQJWRSVLIRUPLQVWR FKHFNWXELQJLQWHJULW\ 3XOO' '3DFNRII RUVLPLODU SOXJVIURPWXELQJ /LPLW LQMHFWLRQ LQWR WKH 2$ WR  EEOV DQG 22$ WR  EEO DIWHU OLTXLG SDFNLQJ DQQXOL  EMP 3 $6XQGU\ :HOO'L 37' $WWDFKPHQWV 'L&XUUHQW6FKHPDWLF 3 $6XQGU\ :HOO'L 37' ) ) "~~]~! :} fÆ~!Æ~~~!Æ AI~A~KA. OIL AND GAS CONSERVATION COMMISSION FRANK H. MURKOWSKI, GOVERNOR 333 W. PH AVENUE, SUITE 100 ANCHORAGE. ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Mr. Dave Cole Oil Team Manager UNOCAL P.O. Box 196247 Anchorage,. AK 99516-6247 0P' \ ~1,/JÎ \ Re: Middle Ground Shoal Unit Platforms Dillon and Baker Dear Mr. Cole: This letter confirms your conversation with CO!D...11lission Engineer Tom Maunder last week regarding the multiple Applications for Sundry Approval (Form 403) you submitted in mid October regarding changing the monitoring frequency on the 16 wells on Dillon Platform and 23 wells on Baker Platform. Production and injection operations were halted on these platforms in 4th Q 2002 and 2nd Q 2003 respectively. Attached, please fmd the Sundry Applications, which are being returned without approval~ because the relief you request needs to be sought through a different procedure. The intent of submitting sundry notices for each well was to establish a monthly pressure and general monitoring frequency for all wells on Dillon and Baker. There is a requirement in place for some of the water injection wells that pressures and rates are to be monitored daily and reported monthly. Since the platforms are unmanned and not operating, it is not possible to obtain daily information. When operations were curtailed, a monthly monitoring frequency was established in the Plans of Development (POD) annually filed with the Division of Oil and Gas and Unocal desires to assure that this monitoring scheme is accepted by the Commission. As noted in the conversation, changing the monitoring frequency where presently in place and establishing a monthly monitoring frequency in general is not an action that is best accomplished with multiple sundry notices. A letter application requesting the desired monitoring schedule should be made under the applicable Area Injection Orders (AlO 7 for Baker and AIO 8 for Dillon) and Conservation Orders (CO 44 and CO 54) for the platforms/unit. The Commission looks forward to receiving your letter applications. If prior monthly monitoring information has not been submitted to the Commission, that information should be ubmitted forthwith. . . No an Daniel T. Seamount, Jr. Commissioner BY ORDER OF THE COMMISSION DATED this L1-day of November, 2004 SCANNED NO\! 2, 3 2004 Enel. Abandon U Alter casing 0 Change approved program 0 2. Operator Name: Union Oil of California aka Unocal 12. Attachments: Description Summary of Proposal ø..... /JI Detailed Operations Program D BOP Sketch / / / 14. Estimated Date for ,?:/ Commencing Operations: / ;' / / / / / 17. I hereby certify that the foregoing is true and c rEft to the best of my knowledge. Contact Printed Name.. (ì ~. A. Ie . ...... ¡. Title Oil Team Supervisor Signature i~¿" ¿J .M~; / Phone 907-263-7805 Date '//1 COMMISSION USE ONLY Conditions of approval: Notify commisi,þ that a representative may witness . . 1. Type of Request: 3. Address: 7. KB Elevation (ft): 110' KB above MSL 8. Property Designation: Dillon 11. Total Depth MD (ft): 10,750' Casing Structural Conductor Surface Intermediate Production Liner Perforation Depth MD (ft): 9,785 to 10,424' Packers and SSSV Type: 16. Verbal Approval: Commission Representative: Plug Integrity 0 Other: Subsequent Form Required: ;~SLi~~~~~;~~;S~~~~~N¡~~~~~;~T 1 2 2004 20 AAC 25.280 Alaska Oil & Operational shutdown U Perforate U And'¡~j~~r U Annular Dispos. U Plug Perforations 0 Stimulate 0 Time Extension 0 Other 0 Perforate New Pool 0 Re-enter Suspended Well 0 Monitor Frequency 4. Current Well Class: 5. Permit to Drill Number: Suspend U Repair well D Pull Tubing 0 P. O. Box 196247 Anchorage, Ak. 99519-6247 Exploratory 0 67-69 ;/ Service 0 6. API Number: ~ 50-733-20058-00 ~ :;:;11 Name and Number: / ::;:I::::s::und ShoaV"G" /. //' )'$ (measured): é~ iron plug @ 9,571' / Burst Development Stratigraphic 0 0 Total Depth TVD (ft): 10,423' Length PRESENT WELL CONDITION SUMMARY Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 10,675' 10,351' Collapse Size MD 650' 1,988' 10,735' /... .....,...h.,./t{ /// 650' /' / , ' 1,988' //¡ 10g3......'.f.'.i<'" ú. " / I / / Tubing Size' / i / i h/:> /3.5" 9.2# N-80 20" 649' 1,954' 10,410' 13-3/8" 9-5/8" Perforation Depth TVD (ft): 9,493 to 10,109' Tubing Grade: Tubing MD (ft): 9,566' Baker Cast Iron Drillable Bridge plu . éti~t Packers and SSSV MD (ft): 9,571' >(/ Date: 13. Well Class after proposed work: Exploratory 0 Development 15. Well Status after proposed work: Oil 0 GasD WAG D GINJ D WDSPL D Service 0 0 0 Abandoned D D Plugged WINJ 28-Sep-2004 Sundry Number: '6 ë) '-I-L/r ð-" BOP Test 0 0 Location Clearance D Mechanical Integrity Test RBDMS 8Fl NOV 2 2 20D4 ~i~~~~~~~BT~ED 11/17/04 Y COMMISSION Approved by: Form 1 o-~ ~Vised 12/2003 COMMISSIONER 0. BY ORDER OF THE COMMISSION : \tAL \ Submit in Duplicate Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATION$<~F(~EI\lE~.[) 1. Operations Abandon Performed: Alter Casing D Change Approved Program D 2. Operator Union Oil of California Name: aka Unocal P. O. Box 196247 Anchorage, Ak. 99519-6247 7. KB Elevation (ft): 110' KB above MSL 8. Property Designation: Dillon 11. Present Well Condition Summary: 3. Address: Total Depth Effective Depth Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Suspend Repair Well D Pull Tubing D Operation Shutdown Plug Perforations D Perforate New Pool D 4. Current Well Class: Development D Stratigraphic D Perforate i r Other ,¡ Stimulate D Time Extension D Shut in and secure Re-enteJ~S6sp~r1d~d~èll8]:h ;~' '\1:,\ -,;,iUII 5. Permit to I1rit - ' Qm~¥': Exploratory D 67-69 Service 0 6. API Number: 50-733-20058-00 9. Well Name and Number: Di-07 10. Field/Pool(s): South Middle Ground Shoal/"G" measured 10,750' true vertical 10,423' feet feet Plugs (measured) @9,571' Junk (measured) measured 10,675' true vertical 10,351' feet feet Length Size 650' 20" 1,988' 13-3/8" 10,735' 9-5/8" MD TVD Burst Collapse 650 1,988 649 1,954 10,735 10,410 Measured depth: 9,785-9,812',9,885-9,948', 10,050-10,080', 10,120-10,214', 10,235-10,340', 10,360-10,375', 10,385-10,424' True Vertical depth: 9,493-9,519', 9,589-,9,649', 9,747-9,786', 9,815-9,906', 9,926-10,028', 10,066-10,061', 10,071-10,109' Tubing: (size, grade, and measured depth) 3.5" Buttress 9.2# N-80, 9566 Packers and SSSV (type and measured depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Oil-Bbl Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: The well was shut in prior to/subsequent to operation. 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory D Development D Daily Report of Well Operations 16. Well Status after proposed work: OilD Gas D WAG D 17. I hereby certify that the foregoing is true and correct to the best of.!:!.l~.!.D9.yYledge. Contact Service 0 GINJ D WINJ 0 WDSPL 0 Sundry Number or N/A if C.O. Exempt: Printed Name P. M. Ayer Title Petroleum Engineer Signature Date 18-Feb-2004 (\ -) 1. «J} 20 O'~ Phone 263-7620 r\nlf"tI\IA' ~~~t. gatG: Spud Date: ~~ $ub8urfa~ Locat!Þn: £1.-,atfon: 11>: PaD: Cc8Jng: Perforcrtiant: Initio( Pot.nt!al: lnlhl Sthm.t\ot!én: ~dr_Qata: Corad lnt.rvaI8: DST Intarwf8 ond R..u1tII: log Inwntoty: 11/2/67 L8t1.SSot4 611" F'Sl.. 18ir FWL. SIc. 35, T8H, R13W, SJI. 11) - 148r nn. 1718' FWL. s.c. 2. T7N, ft13W, s.u. 110- f<B 10150' 1\ID 10423' 1067" 1\10 1035" 20-, 85 and I'" CGafng Nt ot 8:10' wfth 1250 81C cement 13 3.18'". 54-'1 Cafng Nt at 1'88" with 1200 ø cement ø "II, -40, .f.3-S ond 41# N-80 end S-St5 ea.." ..t at 1073~' .Jth 15~ ft C8IMftt 0-1: 9185-1812' G-2: J88.5-1'W 0-3: t0050-100t0' 10120-10214' G-4: t02~1030 10380-10315' 1n38S-10414- f2t;S BOPÐ. 180 BWPD. 470 IlCfD NOM NoM. Nose JEl--Sf', BHC-QR 1/1~ ftA Tnaoer 8120110. 212V72 Temperature-R,\ Thtcer ~1172. 111317. R.\ n-oc.r lnj4tctfon profte 6121/71, ! O/t 8I7t soum MIDDLE GROUND SHOAL ACl -18746 WELl NO.7 HEMLOCK CONGLOMERA.TE PLATFORM DILLON -~~-~~ -~~~- t. Cametoc\ 10"" SInge. doaut hcn9V 2. 3 1/2"" !Mtru. 1.2' N-aO tubing w/ABC cplg8 Depth ~. 9568" (As run 9;11185) f1tJed w/fiItared Inlet 80lt woter inhlbIted to ph Bok8r ecat Iron Dr1J1abl. Brfd98 Plug ..t at 8~71. 30. of P.rtontlon g~ 108t 4180 f1ß at 1 0422' unable to c1~n out -4/1 MO paD 1061S. TD ! 0750' '-----J~-:- J 2 l 20'" 85 At 14# CSA 850' 13 ~ S4.s¡ CSA 1 '88' --/ 102651 10424' M"* 40. 43.5 .. .71 cs.\ 10135' DILLON PLATFORM API # 50-733-20058-00 S. MGS UNIT # 7 WELL HISTORY Well #7 DATE COMPLETED 1968 1/28 8/2 11/15 1969 5/12 5/13 7/3 1973 1/10 1975 12/10 1979 11/6 1983 8/30 1985 3/28 EVENT Completed as an Oil Well. Pull & rerun tubing twice Change out BHA Authorization for abandoning well Convert to water injection Water shut off & perf Repair tubing leak Acidize injection well Convert to dual injector Reperf G-1 & G-2 zones Swag put casing, set liner & perf. 2002 12/08/2002 This well was shut in and isolated at the surface with multiple flanges to isolate the well from surface flow lines. Di#7 Hist 10-15-69.doc, last revised 2/18/2004 page 1 1 ~þ",\ ll)\~~/-\L DI-5 -:= ¡a~ I:": - DI. 3 12~ 20 x 13 518 0.1815 300 54.45 3 1/2 tbg. 0.0087 300 2.61 18 518 x 133/8 0.1291 300 38.7327/8 tbg. 0.00579 300 1.737 133/8 x 9 5/8 0.0671 300 20.13 r- H6 334 9 5/8 x dual 3 1/2 0.0507 300 15.21 355 9 5/8 x dual 2 7/8 0.0571 300 17.13 21 psi pump limit 9 5/8 x 3 1/2 0.0626 300 18.78 Don Sta dual LEG ROOM'1 185/8 x 13318 2O"x 13 3/8" 13 3/8" x 9 5/88 9 5/8" x 3 1/Z' 28~ 22 bbIs 15.5bb1s 30~ I ~ ABN-1 0 DI-13 LEG ROOM #2 DI.18 1.2 bbI 22bb/$ 20bbIs 01.17 0.15 bbIs 15.5bbls 20 bbls 01-16 IS bbIs 20bbIs 01-11 5 bbls 7 ;4bbls DI-8 2 bbIs 25~ ~ ABN-6 ~ LEG ROOM #4 wen #2 well 14 wel. 89 Wen # 10 Wen #13 Wen #7 Wen #8 Wen #11 wen #18 wen 17 wen # 18 wen #3 Wen #5 Wen # 12 Wen #14 wen #15 WELL BAY # 1 Pumped down Ibg.tbg on vac, bled down 9 5/8 x tbg. Pumped 28 bbls. Gas stiR at surface. Pumped down 2Ox135/8 2bbls 100 psi. 20 bbls in 13 3/8, Try to pull eclipse paker with wire line could not get out. Well had 180 on annulus and ISO on Ibg would not bleed down, Tryied pumping down short side old pump in hole could not pump. Put 30 bbls of 9.8 in annulur 9 5/8x tbg. Pumped down 1.5. Ibg. Returned up short side 100 bbIs. Put 15 bbls in 13 5/8x9 5/8. 4 bbls in 20" ann. Hook up to 20" took approx 1 bbI with charge press on ann. 133.8)( 9 5/8 RumP and bleed 3 bþ~ i~ an~. 9 5/8xtbg fluid packed with oil. 14.4 bblsin Ibg. well 10 Is abondoned Fill 20" ann 2 bbls, tbg on vac 7bbls in 13 3/8 x 9 5/8 28 bbls 9 5/8 x Ibg. 5 I.s. 5 s.s.bbls down short side did Ibg. And ann same time WELL BAY # 2 20" fluid packed,13 3/8 x 95/82 bbls and started getting diesel fluid back to swface. Pumped Sbbls in tbg.' 20 bbls In 9 5/8 ann.Annulus and Ibg. Have oil returns 0 press on well. 20" fluid pocked,I3 3/8 x 9 5/8 2 bbls and started getting diesel fluid back to surface. Pumped Sbbls in tbg.' 20 bbls in 9 5/8 ann.Annulus and Ibg. Press up to 500 psi. on both Ibg. Strings had oil to top no press on tbg. Pumped and bled 7bb1s in tbg. Annulus. When annulus was fluid packed. Oil at surface.5 bbls in 13518 x 9 5/8 press limit. .5 bbl. In 20" Well had SOpsl. On 13 3/8x 9518 bleed down to 20psi put bbls of 9.8 fluid, 95/8onn. 20 bbls fluid, Ibg.5bbls each, wells 185/8 has 110 psi. bled off and fluid packed with press limit of 50 psl..75 of a bbl. Well had 100psl. On 13 3/8X 9 5/8 bleed down to 20psi put TSbbIs of 9.8 fluid, 95/8onn. 20 bbls fluid, tbg.5bbls each, wells 185/8 has 60 psi. bled off and fluid packed ann with .75 bbls. Well had 1SOpsi. On 13 3/8x 9 5/8 bleed down to 20psi put 20bbls of 9.8 fluid, 95/8onn. 20 bbls fluid, Ibg.SbbIs each, wells 185/8 OOs25 psi bled off and fluid packed with 9.8 salt took 1.2 bbls. WELL BAY # 4 Rig up pump 4 bbls 1.5. 4 bbl 5.5. 9 5/8 x Ibg. 25 bbls, 13 3/8 x 9 5/8 fluid packed wI 12 bbls, 20" ann. 2 bbls. Auid packed Pumped 4 bbls 1.5. Ibg. 4 bblss.s.R/u to 9 5/8 x 3 1/2 aM. Pumped 15 bbls fluid packed oil to surface. Pumped 4bbls down Ibg Is, 4 bbls 5.5. both went on vac. Pumped 15 bbls 95/8 x31/2. WJthSO psi press limit 0 bbls in 13 3/8x 95/8 Fluid packed 20x 133/8 2 bbls, fluid packed 13 3/8x9 5/8 12 bbls press up to 200 psi and held. Rig up pump 5 bbls 1.5.25 bbls.s. & 9 5/8 x tbg. 8 bbls fluid packed oil to surface 13 5/8x9 5/8, R/U to 20" ann fluid pack 5 bbls. Press limit 20 psi. Unocal Corporation 909 West 9* Avenue, P.O. Box 196247 Anchorage, Alaska 99519-6247 UNOCAL ) December 11, 2001 Tom Maunder State of Alaska Alaska Oil and Gas Conservation Commission 333 W 7th Ave 4/100 Anchorage, Alaska 99501-3539 Re: Modified MIT on Dillon 7 Shut-in Injection well Dear Tom: A consecutive, seven (7) day pressure surveillance was finished on the Dillon 7 shut-in injector (Permit # 1670690 AP1 733-20058-00) on 05/10/01. The tubing, production casing and outer casing pressures were monitored and recorded for three (3) consecutive days. The production casing pressure was altered by 200 psi. Pressures were then monitored and recorded for an additional four (4) consecutive days. See attached data sheet and well schematic. It is clear from recent pressure surveillance and testing that the cast iron bridge plug provides isolation and therefore Dillon 7 cannot have flow from the productive interval into the 9 5/8" casing. The water flood system on the Dillon Platform has been disassembled and we are not currently planning to resume further injection on this platform. Therefore we ask that you approve the shut-in MIT. We have attached a 10-403 for your approval. C.~o~i~ly, Senior Reservoir Engineer Cook Inlet Waterfiood Management RECEIVED Aogcc Di 7 SI MIT 12-11-01.doc DEC 3 1 Z001 Nal Oil& asCcm. JJD STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon: Suspend: Operation shutdown: Re-enter suspended well: Alter casing: Repair well Plugging: Time extension Stimulate: Change approved prograrr Pull tubing: Variance: Perforate: Other: Shut-in MIT 2. Name of Operato 5. Type of well 6. Datum elevation (DF or KB Union Oil Company of California (UnocalI Development 110' KB ABOVE MSl. feel 3. Address Exploratory 7. Unit or Property nam~ Stratigraphic: PO BOX 190247 ANC, AK. 9951.( Service: X South Middle Ground Shoal 4. Location of well at surface Leg 2, Cond. 4, Dillon Platform 8. Well number 697' FSL, 1877' FWL, Sec. 35-T8N-R13W-SIV No. 7 At top of productive interva 9. Permit numbe~ 67-69 At effective deptl' 10. APl number 50-733-20058-013 At total deptl' 11. Field/Poo 1489' FNL, 1718' FWL, Sec. 2-T7N-R13W-SN Middle Ground Shoal/"G" 12. Present well condition summar Total depth: measu red 10750' feel Plugs (measured', None true ve rtica 10423' feel Effective depth: measured 10675' feel Junk (measured'~ None true vertica 10351 ' feel Casing Length Size Cementec Measured dept[ True vertical deptl' Structural Conductor 650' 20" 1250 Sx 650' Surface 1988' 13-3/8" 1200 Sx 1988' Intermediate Production 10,735' 9-5/8" 1550 Sx 10,735' Liner Perforation depth measured (See Attached Wellbore Schematic', true vertica Tubing (size, grade, and measured deptl- 3.5" Buttress 9.2# N-80, 9566 Packers and SSSV (type and measured deptl' Baker Cast Iron Drilliable Brid~le plug set at 957' 13. Attachement~ Description summary of proposal X Detailed operations prograrr BOP sketch: 14. Estimated date for commencing operatic 15. Status of well classification as 16. If proposal well verbally approve( Oil: Gas: Suspended: Name of approver Date approved Service X 17. I hereby certify that the foregoing is true and correct to the best of my knowled.( C h ris~/f~/~/~' Signed: /X~f~f_~///.~/~,¢/ ...... Title: Senior Reservoir Enginee Date: 12/20/2001 C/' ' - v FOR COMMISSION USE ONLY Conditions of approval:Plug integ rityN°tify Commission s OBoP representative may witnessTest Location clearance I Appr°val N°~;~('~) ) '~..-~echanical Integrity Test~l~' Subsequent form required 10- ~ ~ - - Original Signed By Approved by order of the Commissioner Cammy 0echsli Commissioner Date.,.~j/c;~ '7 / (-~ Cover letter at \~Ak-Anchorage\GroupsV~,OGCC\CorrespondencesV~,ogcc D, '!REaEIVED Form 10-403 Rev 06/15/88 DEC 3 1 Z001 Naska0il&GasCals.~ SUBMIT IN TRIPLICATE MAY IB '01 .06:18PM UNOP~ DILLON P.5 P.~ocedure for I~T on Dillon D.i-? Shut-in Ioiec~.. r . , Record daily tubing, casing, and outer casing pressures for a consecutive three day period. Increase casing pressure by 200 psi. Continue recording .daily tubing, casing, and outer casing pressures for an additional, consec~ive, four-day period. ~DateTubin. g P.ressum Casing P.mssum Outer Casing Pmssu. re ~:, "l,. iI~...l~.q-~'. q', s-~" ~::,~..!'"'~" ~5'"'.-.~ ~1~: t, x'~ c,'- / ~. - .'~:<~:ii'~.~'".~t~.. ,,~,, .. . ,, , I .. , ,,, , , , . , · --: .~ _ , Pressures Recorded By: · . :, . q,. . , Spud Perfofo~on~: ~ lnt~rvab: DST lntmnmll ond I~llultl: SOUTH MIDDLE GROUND SHOAL. ADL 18746 WEt. J- NO. 7 HEMLOCK CONGLOMERATE PLkTF'ORM DILLON 1/2/67 Sg/' ~ 1877' ~ SILO. 35, TOll, R13W, ~Jd. TD- t489' PNL~ 1718' Ir Wt. .~0. 2, T'/N, R13W, ~. 110' KB 0~50' TVD 1042~o 10675* 1VD 10351' 9 .~vl", 40, 4~.5 on4 47~11 N-80 md S--95 Coming Nt ~t 1073:5' 1/2' Buttrear~ la.2lF N-80 tubing w/ABC eF4g~ Fitled w/~Itirid Inlet aolt wat4r ...... inhibited 10 ph 12~ BOPD, 190 BWPt), 470 Plug ~et at 0~71' 30' of P~tor~thm gun~ Ic~t ~ Fill at 10422' unabl4 to c~n out PBD 10675' TO 10750' g88,~--ggM' 10214' & 47~ ~ 1073~' GAS'CONSERVATION COMM,. APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Operation shutdown _ _ Alter casing __ Repair well m Change approved program __ Pull tubing __ Variance __ 2. Name_o.f Operator_. Company Prje~ union ull of Californ~2'T(. f "' nt~_~ , r [ - '"~"~'"~p Oatorly_ 3'A~re~.o. BOX 196247, Anch., AK, 91519-6~r~gS~rPv~eC~ 4. Location of well at surface Leg # 2, Re-enter suspended well __ Plugging ' Time extension Stimulate__ Perforat, __ Other Slot 4, Platform Dillon 6. Datum elevation (DF or KB) _ 10¢' RXE MSL XUnitor~rope~name ~¥GS Unit 8. Wellnumber feet 697' FSL, 1877' FWL, Sec. 35, T8N, R13W, SM At top of productive interval 1406' FNL, 1943' FWL, Sec. 2, TTN, R13W, SM At effective depth 1364' FNL, 2018' FWL, Sec. 2, TTN, R13W, SM At total depth 1489' FNL, 1718 FWL, Sec. 2, TTN, R13W, SM 12. Present welt condition summary Total depth: measured true vertical 10750' feet 10424' feet Plugs (measured) 7 9. Permit number 67-69 10. APInumber 50-- 733-20058 11. Field/Pool SMGS/Hemlock Effective depth: measured true vertical 9571' ~et 9287'feet Junk (measured) Casing Length Size Cemented Structural Conductor 607 ' 20" 1250 SX Surface 1949 ' 13-3/8" 1200 sx Intermediate 10705' 9-5/8" 1550 SX Production Liner Perforation depth: measured true vertical Tubing (size, grade, and measured depth) See attachment 3-1/2" 9 2# N-80 @ , I · I Packers and SSSV (type and measured depth) Measureddepth 650' 1988' 10735' ~ueve~icaldepth 650' 1954' 10410' RECEIVED DEC - 9 1991 9566 Alaska Oil & Gas Cons. Comm'ts¢(: Anchorage 13. Attachments Description summary of proposal __ Detailed operations program ..~ BOP sketch 14. Estimated date for commencing operation October 28, 1991 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil __ Gas __ Suspended _... Service 17. I hereby cgrti{y that the foregoing is true and correct to the best of my knowledge. ~ ~~ T,tle Signed ~~Y S'. BUSH ' REGIONAL DRILLING MAN[~R L.2 , FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness 1 Approval No. Plug integrity __ BOP Test __ Location clearance __ I Mechanical Integrity Test ~ Subsequent form required 10- Approved by order of the Commissioner ORIGINAL SIGNED BY LONNIF- C. Sf,~!TH ' Commissioner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE RECEIVED D'E.C - 9 't99~ Alaska Oil & Gas Cons. Com~tSs'tot~ Anchorage mmmmm m mmm m m m~ ~ mmm ~ m ~ ~mHm minim_ mmmm ~mm ,mmmmmmm Bmmmmm mm P~.e~..n .~. t ..Dat._o_:. Spud Dote.' Sub~Jrfo~ Location: Ebvotlon: TO: PBO: Caihlg: Perfor~on.: Initial Pobntiah Initial Stimulation: Cored Intervals: DST Intsrvalm Grid Results: Log Inventory: SOUTH MIDDLE GROUND SHOAL ADL 18746 WELL NO. 7 HEMLOCK CONGLOMERATE PLATFORM DILLON 11/2/87 Leg 2, mot 4 897' FSI.,. 1877' F'M., ho. 35, TSN, RI3W, SJJ. 11) - 140g' Iq4L, 1718' ~ ho. 2, T/N, R13W, 5~M. 110' KB 10750. TVD 10423' 10675' 1M3 10351' 20", 85 and 0_4~ Casing sit st 150' with 1250 ex c~rn~nt 13 3/8% 54.511 Caring ~ It 1988' with 1200 ex cimmt . 6 M", 40, 43J mhd 4711 H--80 and S-S5 Coring Nt at 107~5 Mth 1550 ~x c~u~ent ~ompletion Record 1. Cameron 10" Single donut hanger 2. 3 I,/2" Buttrum g.2J N-BO tubing w/)~3C eplge 3~' gSee' (A~ run g/8/BS) Filled ~Vtlltamd Inlet ear wal~r inhibited 10 ph G-ls 9715--9812' · --.2: gllS-gHt' 1~-3; 1005Q-10090' 10120--10214' 0-4: 10215-1034Q' 10380-10375' 10365-10424' 128,1 BOPD, 180 BWPD, 470 UCFD None None None Temp~lt~ 1~ 3/3t/72, 11/3/74 I~. hoer bJiotlMt profile 8/21/7'7, Baki* Caet Iron Ddllablm Bridge Plug Nt at 0.571' 30' of Perforation guns Io.t 4/80 fill at 10422' unable to clean out 4/1A/80 PBD 10675' TO 10750' 13 3/~" *4.0ill 078~-g81~' 100~0' 10214' 10285' I042~ & 47J CSA 10730' South Middle Ground Shoal ADL 18746 Well No. 7 Procedure for suspending an;] freeze protecting well: 1) Circulate power oil into 9 5/8" annulus taking returns up tubing. Displace fluid in well until power oil reaches 150' in annulus. 9 5/8" casing X tubing will be protected against freezing by power oil at this point. 2) Circulate power oil into tubing taking returns from annulus. Displace until power oil reaches 100' in tubing. Tubing will be protected against freezing by power oil at this point, 3) Close all valves on the well head. 4) Install gauges on the tubing and 9 5/8" casing X tubing annulus. RF..CF.[V W. G. Smith District Manager Amoco Production Company Post Office Box 100779 Anchorage. Alaska 99510 907-272-8471 September 19, 1985 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive' Anchorage, Alaska 99501 File: TJZ-334-WF Dear Sir: Subsequent Notice SMGS 18746 Well No. 7 Platform Dillon, Cook Inlet, Alaska Attached in duplicate for your files is a State of Alaska Form 10-403, Sundry Notices and Reports on Wells, informing you of Work recently completed on SMGS Well No. 7. Very truly yours, W. G. Smith District Manager Attachments JCB/dds O03/jcbl RECEIVED Alaska 011 & (~as Cons. Commission Anchorage STATE OF ALASKA ALASKA AND GAS CONSERVATION COl ISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator , Amoco Production Company 3. Address . P. O. Box 100779, Anchorage; Ala.~ka 99.ElO 4, Location of Well Leg 2, Slot 4, SMGS Platform Dil, lon 699' FSL, 1,8 74' FWL, Sec. 35 T8N, R13W, S.M. 7. Permit No. fi7-69 8, APl Number 5o- 733-20058 9. Unit or Lease Name ~,1 1~.,,~.. vii , ~, 10. Well Number 1 1. Field and P]ol 5. Elevation1 onin, feetvD(indicate KB, DF, etc.) J 6. LeaseA nl DesignationlQ.7 A ~: and Serial No. I ,,...~S°uthA AMi,. ddl e Ground Shoal .... .t. v~,~I\L~ .U/-T 12. Check Appropriate Box~n~lcate~ature of Notice, Report, or Ot~[~'~~ NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Sti,mulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made ~ Other [] Pull Tubing [] Other [] Pulling Tubing ~ (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Between September 3 - September 8, Amoco Production Company: 1. Nippled up BOP's and pressure tested. 2. Pulled tubing. 3. Retrieved packer at 9,550 feet. 4. Tagged tight spot at 9,791 feet w/ 8½-inch bit. 5. Worked 4 3/4-inch bit to 9,968 feet. Could go no further. 6. Set CIBP at 9,571 feet. 7. Ran tubing to 9,564 feet. Inhibited annulus. 8. Nippled up three and pressure tested. RECEIVED SEP Alaska Oil & Gas Cons. Commission Anchorage 1Si~ie;ere~,~~~~ect The space below for Commission use to the best of my knowledge. Title_Iii strict Manager Conditions of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate W. G. Smith District Manager Amoco Production Company Post Office Box 100779 Anchorage, Alaska 99510 907-272-8471 June 26, 1985 File: TJZ-239-WF Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Notice of Intent SMGS 18746 Well No. 7 Platform Dillon, Cook Inlet, Alaska Attached in triplicate for your approval is a State of' Alaska Form 10-403, Sundry Notices and Reports on Wells, to notify you of our intent to repair SMGS 18746 Well No. 7. The well appears to have collapsed casing above the Hemlock pay horizons and this will be repaired so that the well can be placed back on injection. Any questions concerning this repair can be directed to Jeff Blagg at 263-2211. Very truly yours, W. R. Halvorson Acting District Manager Attachments JCB/dds RECEIVED JUN27 t,q Alaska Oii& Gas Cons. Commission Anchorage STATE OF ALASKA ALASKA AND GAS CONSERVATION CO, ISSION SUNDRY NOTICES AND iREPORTS WELLS 1. DRILLING WELL [] COMPLETED WELL~ OTHER [] 2. Name of Operator 7. Permit No. Amoco Production Company 67-69 3. Address 8. APl Number P. 0. Box 100779, Anchorage, Alaska 99510 50- 733-20058 4. Location of Well Leg 2, Slot 4, SMGS Platform Dillon 699' FSL, 1872' FWL, Sec. 35, T8N, R13W, S.M. 5. Elevation in feet (indicate KB, DF, etc.) 100' KB MSL I 6 . Lease Designation and Serial No. ADL 18746 12. 9. Unit or Lease Name SMGS Unit 10. Well Number 7 11. Field and Pool South Middle Ground Shoal Hemlock Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing ~[ Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well J~ Change Plans [] Repairs Made [] Other [] Pull Tubing ~] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). In July, 1985, Amoco Production Company plans to' 1. Nipple up BOP's and pressure test. 2. Pull tubing and drill out packer at 9,550 feet. 7'ff~o2~ 3. Wash fill to 10,500 feet. ~'-'"~; 4. set-'~cab liner from 9,740 feet - 10,110 feet. 5.Reperforate injectio~ intervals 10,120- 10,224 f/e~t, 10,260 10,340 feet, 10,360 - 10,425 feet with 4 JSPF. 6. Set packer at 9,650 feet. , 7. Run single string injection tubing. ¢~/~ ~_~ 8. Inhibit annulus. 9. Return well to injection. ~/so ~)/~¢~4 14. I hereby certify that thC foregoing is true and correct to the best of my knowledge. Signed Title Distr~ct Manager The space below for Commission use Gas Cons. C0mmJssi Anchorage Date06/26/85 Conditions of Approval, if any: Approved Co~py Returned OltlIINAL $'IGMEB' By Order of Approvedby 'IIY RAI~R¥ YI. KIIGLEII COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 Submit "intentions" in Triplicate and "Subsequent Reports" in Duplicate L. A. Darsow District Superintendent Amoco Production Company Post Office Box 100779 Anchorage, Alaska 99510 907-272-8471 September 22, 1983 File- LAD-929-WF Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Subsequent Notice SMGS Unit Well No. 7 Platform Dillon, Cook Inlet, Alaska Attached in duplicate is a State of Alaska Form 10-403, Sundry Notices and Reports on Wells, subsequent to the work done on SMGS Unit Well No. 7. The G-1 and G-2 zones of the Hemlock conglomerate sandstone were not reperforated due to a restriction in the wellbore suspected to be collapsed casing located in the upper G-1 zone of the Hemlock at approximately 9,778 feet. The well was returned to injection pending further evaluation of future repair possibilities. Very truly yours, L. A. Darsow District Superintendent Attachments MTS/seh RECEIVED SEP Oil & Gas Cons, Commission Anchorage SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] 2. Name of Operator COMPLETED WELL 7. Permit No. OTHER [] Amoco Production Company 3. Address Post Office Box 100779, Anchorage, Alaska 9951r0' 4, Location of Well Surface Location: Leg 2, Slot 4, SMGS Platform Dillon Subsurface Location: 1,489'FNL, 1,718'FWL, Section 2, T7N, R13W, S.M. 5. Elevation in feet (indicate KB, DF, etc.) 1lO'KB, MSL i 6 . Lease Designation and Serial No. [ ADL 18746 67-,69 8. APl Number 50~'33.20058 . 9. Unit or Lease Name SMGS Unit 10. Well Number 7 11. Field and Pool South Middle Ground Shoal Hemlock 12. (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Amoco Production Company performed the following work' 1. Shut well in, rigged up 10,000 psi lubricator, and tested to 3,900 psi. 2. Did not reperforate due to a restriction in the wellbore suspected to be collapsed casing located at approximately 9,778 feet. 3. Rigged down lubricator and returned well to injection. 14. I hereby certify that~ng is true and correct to the best of my knowledge. The space below for Commission use Alaska 0ii & Gas C0r!s. Anchorage Title District Superintendent Conditions of Approval, if any: Approved by_ By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" ~n Triplicate and "Subsequent Repeals" in Duplicate (AMOCOI L. A. Darsow District Superintendent Amoco Production Company Post Office Box 100779 Anchorage, Alaska 99510 907-272-8471 August 30, 1983 File' LAD-865-WF Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive AnChorage, Alaska 99501 Dear Sir' Notice of Intent SMGS Unit Well No. 7 Platform Dillon, Cook Inlet, Alaska Attached in triplicate for your approval is a State of Alaska Form 10-403, Sundry Notices and Reports on Wells, to notify you of our intent to reperforate the G-1 and G-2 zones of the Hemlock conglomerate sandstone in SMGS Unit Well No. 7. This work is being done to increase injections into these zones to result in an increase in production from offset production wells. Any questions concerning this project can be directed to Mike Schwein in our Anchorage office. Very truly yours, L. A. Darsow Di stri ct Superintendent Attachment MTS/seh SEP 0 :.~: i9~3 Gas C~ns.. 't;0mmissior~ Anchorage  STATE OF ALASKA ALASK/-, IL AND GAS CONSERVATION C MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator Amoco Production Company 3. Address P. 0. Box 100779, Anchorage, Alaska 99510 4. Location of Well Surface Location' Leg 2, Slot 4, SMGS Platform Dillon Subsurface Location' 1,489' FNL, 1,718' FWL, Section 2, T7N, R13W, S.M. 7. Permit No. 67-69 8. APl Nu,',/ber 5o- 733-20058 9. Unit or Lease Name SMGS Unit 10. Well Number 7 11. Field and Pool South Middle Ground Shoal 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Hem1 ock 110' KB, MSL I ADL 18746 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate IX Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Welt" [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Amoco Production Company plans to' 1. Shut the well in, rig up 5,000 psi. lubricator, and test to 4,200 psi. 2. Reperforate the following zones of the Hemlock conglomerate sandstone at 4JSPF. Zone Depth Length G-1 9,785' - 9,812' 27' G-2 9,860' - 9,870' 10' 37' Total 3. Rig down lubricator and return to injection. ECEIVED Subsee2.~ent Work on Fora No./~Dat~ 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~..~_~ ,¢~~~ Title District Superintendent The space below for Commission use Date g/3o/g_g _ / / Conditions of Approval, if any: Approved by_ Approved COpy Returned By Order of COMMISSIONER the Commission Submit "Intentions" ~n Triplicate Form 10-403 Rev. 7-1-80 and "Subsequent Reports" in Duplicate L. A. Darsow District Superintendent September 19, 1980 File- LAD-982-WF Mr. Hoyle H. Hamilton, Commissioner Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 J .~COM/V"/~ Amoco Production Coml: Post Office Box 779 Anchorage, Alaska 99510 / j I 4.ENG J Dear Sir- Subsequent Report of Well Work SMGS Unit 18746 Well No. 7 Platform Dillon, Cook Inlet, Alaska Please find attached in duplicate for your information our State of Alaska Form 10-403, Sundry Notices and Reports on Wells. Repair work commenced March 30, 1980 to convert this well to dual stri.ng injection. Due to downhole problems of collapsed casi.ng in several locations, proposed cement work and conversion to dual string injection was not performed. This well is currently injecting (single stri.ng) 1500 BWPD at 3850 psi. Yours very truly, // L. A. Barsow District Superintendent Attachment KEO/klt Form 10-403* REV. 1-10~73 Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) WELL I.-J OTHER Water Injection Well 2. NAME OF OPERATOR Amoco Production Company 3. ADDRESS OF OPERATOR P. 0. Box 779. Anchorage. Alaska 99510 4. LOCATION OF WELL Atsurface Leg 2. Slot 4. SMGS PlatfOrm Dillon 1872' FWL, 699' FSL, Sec. 35, T8N, R131~, S.M. / 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KB. 100' MSL 14, Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-133-20058 6. LEASE DESIGNATION AND SERIAL NO. ADL 18746 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME SMGS Unit 9. WELL NO. 7 10. FIELD AND POOL, OR WILDCAT South Middle Ground Shoal 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 35, T8N, R13W, S.M. 12. PERMIT NO, 67-69 )orr, or Other Data NOTICE OF INTENTION TO-' TEST WATER SHUT-OFF ~ PULL OR ALTER CASING FRACTU R E TREAT MU LTl PLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT OF: FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (et,.,) Se§regate ction Intervals (NOTE= Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS. (Clearly state all Dertlnent details, and give pertinent dates, Including estimated date of starting any proposed work. Repair work was not completed as described in original Notice of Intention due to collapsed casing in several locations. The subject well was retUrned to single string injection. Current injections are.1500 BWPD at 3850 psi. TITLE District Superintendent DATE September 19, 1980 (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE DATE See Instructions On Reverse Side 02-00115 (Rev, 10/76~ STATE of ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION TO: ~WELL FILE DATE: August 27, 1980 FILE NO: FROM: Joe Gree~~ Petroleum~,~ Engineer TELEPHONE NO: SUBJECT; Amoco's SMGS Well No. 7. On August 26, 1980 Kevin O'Connell related that when attempting to enter this well they found sPlit casing and have abOrted the proposed packer segregation. The work described on form 10-403 dated December 21, 1979 and approved December 28, 1979 will not be done. Plan to redrill the well but won't be done in 1980; "...perhaps next year." L. A. Darsow District Superintendent December 21, 1979 Fi 1 e: LAD-1099-WF Amoco Producti Post Office Box 779 Anchorage, Alaska 9951 907 - 272-8471 Mr. Hoyle H. Hamilton, Commissioner Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Notice of Intent to Perform Well Work SMGS Unit Well No. 7 Platform Dillon,'Cook Inlet,'Alaska Please find attached in triplicate for your approval our State of Alaska Form 10-403, Sundry Notices and Reports on Wells, to perform injection profile improvement work on the subject well. The purpose of the work is to increase injections into the tight G'4 bench by segre- gati.ng it from the shallower and more permeable injection intervals. The anticipated starting date for this work is January 10, 1979. Very truly yours, L. A. Darsow District Superintendent Attachment RJR/klt Form 10-¢03 REV. 1-10-,73 ~ ~ Submit "1 ntentions" in Triplicate & "Subsequent Reports" in Duplicate _ STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for. proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) °w~,F-1WELLGAS n-1 OTHER Water Injection Well NAME OF OPERATOR Amoco Production Company 3. ADDRESS OF OPERATOR P. O. Box 779, Anchorage, Alaska 99510 4o LOCATION OF WELL At,u,ace Leg 2, Slot 4, SMGS Platform Dillon 1872' FWL, 699' FSL, Sec. 35, T8N, R13W, S.M. 13. ELEVATIONS (Show whether DF, RT, GR, et~) RKB 100' MSL 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-133- 20058 6. LEASE DESIGNATION AND SERIAL NO. ADL 18746 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME SMGS Unit 9. WELL NO. 7 10. FIELD AND POOL, OR WILDCAT South Middle Ground Shoal 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 35, T8N, R1BW, S.M. 12. PERMIT NO. 67-69 )ort, or Other Data NOTICE OF INTENTION TO; FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (other) Seqregate In.iection Intervals SUBSEQUENT REPORT OF.. WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE'PROPOSED OR COMPLETED OPERATIONS (Clearly state all Dertlnent ¢letalls, and give pertinent dates, including estimated date of starting any proposed work. Amoco proposes to segregate injections into the G-l, G-2, G-3B and G-4 intervals as follows' · e Be Pull tubing string and drill out permanent packer at 9,599' MD. Test for communication between following intervals and squeeze if communication present: G-4 and G-3B G-3B and G-2 G-2 and G-1 Clean out to 10,520' MD. Reperforate all injection intervals (G,I: 9,785-9,812'; G-2: 9,860--9,870', 9,885-9,946'; G-3B: 10,050-10,090', 10,120-10,214'; G-4: 10,265-10,340', 10,360 ,375', 10,385-10,424') · Set ~ packer at 9,600' MD ~nd~ packer at 10,239' MD. ~z/~r/~, ~r Run dual injection strings and initiate injections into all injection intervals. Anticipated starting date for this work is January 10, 1979. . TITLE District Superintendent DATE December 21, 1979 (This sPace for State office use) APPROVED BY' TITLE CONDITIONS See Instructions On Reverse Side DATE r, .~ ~f. ~.;,-~. ~etroieuro Branch Met iai an ~ ~ ~ - _'~. ~ --~--- ?.-_--~ ................ _ Leg. ~:~ SLOt %>' ~Lati:orm "~r' {~oc~r~'kor Pan American Pet Coro~ Location (S~ac,=) O~ C~>~ South i~S !/nit ~oc (Bottom) 1489 ' Spud Sus~}.ended Area ~!c.~ale Ground Drilling ceasea f~andoned Total Depths, ltl}. 750 ~ C.sg. Hd. 59~4 Elevation ' ""-' ~' ....... ~- '- ,~--,? -'-Ta Bean 124 -/6'4 CP -- psi, 20'-85 & 94:s' '- 650 ~ 1250 __~~~,~m~,~ 13 oz.o -~.~.,- ].988 1200 .... 9 5/8"'-40','43&' 10,785' 1550 . _ G~OLQGIC PO~AT iONS · Surface 'LoWest Tested TP-. $%_,~ ps~ 1.0,075 ~-90"; 10,155 "-75 '; .~,.,'~':"~,-,.6~ ~'80 ;i0329.5'-320~ ; !'0,385 ' -400 '. . : ... PRODUCTIVE HORIZONS Dap ~v_h Contents t~q~ LL STATUS Hay June 'July Aug Sept Oct ~[ov -r.,-. -, ........ :~-,~ OKG ~ Submit ,"Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATIONi ,COMMITTEE SUNDRY NOTICES AND REPORTS O,N WELLS (Do riot use this form for proposals to drill or to deepen or plug back to a diffierent reservoir. Use "APPLICATION FOR PERMIT--" for such proposals.) OIL [] OAS [] WELL WELL OTHER 2. NAME OF OPERATOR Pan American Petroleum Corporation 31 'ADDRESS OF OPEIIATOR P. 0. Box 779~ Anchorage 4. LOCATION. OF W~LL Atsurface Leg 2, Slot 4, SMCS Platform-"D"; 699' FSL, 1872' FWL, Section 35, T8N, R13W, S.M. 13. F.I.F. VATIONS (Show whether DF, RT, GE, etc. RKB 100' above MSL 14. Check Appropriate Box To [nd}cate Nlat'ure of N~oti'ce, Re, NOTZCm 0F ZNTEN~ION TO: TEST W*TER 8HUT-0FF ~ PULL OR ALTER CASING FRACTURE TREAT j j MULTIPLE COMPI,ETE SHOOT OR ACIDIZE J J ABANDONS REPAIR WELL ~__~ CHANGE PLANS (Other) I(IV , _ i API NU~CaL CODE U' ~ 50- 133- 20058 o=,HWK ~/~ ~'~t~ ,~. L~.,s~. D~NA~ON ~D SE~'NO. ADL- 18746 - 8. UNIT, FAR1Vi OR LEASE NA/VIE South Middle Ground Shoal 9. WELL NO. 7 10. FIELD .M~TD POOL, OR WILDCAT South Middle Ground Shoal 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 2~ T7N~ R13~,~ S.M. 12. PER1VIIT NO. 67-69 ~ort, or Other 'Dmta SUBSEQUENT REPORT OF: FRACTgRE TREA~E~¢ J~I ALTERING CA~,~ [ SHOOTING OR ACI~I,I~O L____J A~AN~O~ME~' J J (Other) Commence Injection ' ' J.~j (NOTE: Report results o~ multiple completion on Weli' · Completion or Recompletion Report and Log form.) Il Il '"15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clea~'ly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. . Water injection was started at midnight, October 15, 1969 with initial injection of 400 BW in 4 hours at 1500 PSI. Injection was discontinued on October 1·6, 1969 pending injection system revisions. RECEIVED DIVISION OF OII- AND GA8 (This space for S~ate office use) TITLEAsst. Area Admin. Supvr. APPROVED BY CONDITIONS OF APPROVAL, IF AH: TITLE DATm0Ctober 24, 1969 DATE See 'instructions On Reverse Side Form l~ro. R~V. 9-:~o-e'; STATE OF ALASKA O~L AND GAS CONSERVATION COMMITTEE ~RONT'HLY REPORT O:F DRILLING AND WOR'KOVER OPERATIONS SUBMIT IN DEPLICATE 0IL ~ GAS ?~ WELL WELL OTHER 2.NAME OF OPERATOR Pan American Petroleum Corporation 3,ADDRESS OF OPERATOR P. 0. Box 779 - Anchorage, Alaska 99501 4.LOCATION O'F WELL Leg 2, Slot '4, SMGS Platform "'D"; 699' FSL, 1872' FWL, Section 35, T8N, R13W, S.M. AP1 NLVN[ERICAL CODE . KLY, ---. 50=133-20058 HWK A~L-18746 IF INDIAN, ALOTTEE OR TRIBE 8.'~3~'~,F.~%{ OR LEASE NA_ME South Middle Ground Shoal ~, WELL NO. -7 10. FIELD A_ND POOL. OR WILDCAT South Middle Ground Shoal 'il. SEC., T. R.. Ai.. t BO/'FOM HOLE Sec. 2, T7N, R13W, S.M. 12. PER~IT NO. 67-69 13. REPOi~T TOTAL DEPTH AT END OF MONTH. CI-LA-NGES IN HOLE SIZE, CASING ~ CEAIENTING JOBS INCLUDING DEPTH SET A!N-D VOLI/MES USED, PEi{FORATIONS. TESTS A/VD ,RESULTS. FISHING JOBS. JLrNK IN HOLE Ai~D SIDE-TRACKED HOLE AND AllY OTHER SIGNIFICA~T CIiANGES IN HOL~ CONDITIONS. 9/12-9/17 Pulled dual tubing. Perforated 10400 - 10424, 10320 - 10330, 10280-10295, 10175-10214, 10120=10155, 10060-10075, 9920-9946, 9895-9905, 9805-9812,1 ali with 4 JSPF. 9/18-9/20 Set retrievable bridge plug and packer at 10593. Aci~ized with Dowell 12-10 Ultra Acid containing 4 gallons per1000 gallons A-Il0 Inhibitor as follows: First Stage: BP at 10500; pkr at 10252 to treat perfs 10265-10424 with 4800 gallons acid at 1/2-3/4 BP~ at 2500 psi. Second Stage: Pkr reset at 10027 to treat perfs 10050-10424 with 4700 gallons acid at 1/2 BPHat 2000 psi to 2 1/2 BPN at 1000 psi. Third Stage: Pkr reset at 9750 to treat perfs 9805-10424 with 3500 gallons acid at 2 1/2 BPMat 1700 psi. 9/21-9/23 Displaced with 500 BBL water at 1 1/2 BPM at 2500 psi. Pulled bridge plug and packer. Set Baker FHHydroset packer at 9739 and ran tubing. Rigged up wireline to run BHP survey. Rau 48 hour BHP survey 9/24-10/1 PB~rD 10658. 1 1969 DIVISION OF OIL AND OAS Waiting on high pressure fuel gas. aov~olONY $¥o aNY 11o do 696L , t ', ..... ce ' " ' forego' g is true and szo~ ~T~SSt. ~ea A~n. Supe~~-~ 10/8/69 on this form is requirea for each ~lendar month, regardless of the ~atus of operations, an~ muR ~ file~ in dupli~te with the Division of Mines & Minerals by the 15th ~ the succeedin~ menth, unless othe~ise dire~ed. Form~" p~7 _ _.. STATE OF ALASKA (See other structions on I - 50-133- 20058 - ~ ' ~lhlCO*~ ~ , , .... - .~ WELL CO~~I~~~ECOMPLETION REPORT AND LOG* WELL WELL DRY Other b. TYPE 0F COMPLE~ON: ~VELL 0YER EN ~ACK EESYR. Other ~. N~ME OF OPERATOg ~ ~ Pan ~er~can Petroleum. Corpqrat~on B'~x P~ 0. 779.- ~ncho~¢age ~Iaska 99501 ~ LOCATI~ OF W~ELL (.Re, or( locatio~ clearly and'~:tn accordance with any State requirements)* At surface At top prod. interval reported ~ below . ~ ( At total depth . 13'D'~'TESPUD'DE~) I14'DATE'LD"RF-'~CI-I~OII§'DATECO'IV~PSUSPO(RABAND'... ':' 7/1/68 ~:J..~ '~ : ~Y* ROTARY TOOLS ~. PR~UCING ~T~VAL(S), OF T~IS CO~TION--TO~, B.O~OM, N~E (~ AND ~)* TYPE ELEu'i'rtIC AND OTH~A~'- LOGS RUN ': 6. L~ASE D~S~GNATION A~D SERIAL NO. ADL - 18746 IF INT)IAN, ALL~ OR ~BE N~ . ~ ~., 8. uN~,F~ Oa L~SE N~ · SMGS Unit ~. W~B 10.: F~[ ~ P~L; OR WI~,~T s}oUt~~ H~ddle ~round Shoal Sec: ~:~35, T8N, R13~, S.~ : :~ 67- 69 I~TERVALS DRILLED BY CEA~N'TIiN~G IIIIll II I ..- CASING RDRD (Re~rt all strings set in well) ' ~A~$TbNG SIZE WEIGh, LB/FT. HOLE SIZE 27.. SIZE FJEC'O,I%D 26. LINE~ '~8. PE~O~TIONS or~ ~o ' ' ' PRODU~;'I'~O1V, (interVal size and humber) 29. aECO~ ACID, S.I-!OT, F~q~CI'LrRE, C .]~ENT SQUE~ZE, ETC. Ii~T]~P~VAL (iVI/))7':~:~[ ~A1V/OIJNT'2~q3 I~IND.OF 1Vf~.TERIAL USED i i i I 30. PRODUCTION TUBING RE~OI%D , ,,?,,,, ,, i ~ i DATE FIRST PI~ODUCTION [ PI~ODUCTION METI{OD (Flowh~.g, gas lift, pumphug--size and type of p~p) DATE OF T~ST, IHO~S T~ ' [~OXE SIZE [PROD'N FOR OI~BBL. 7/1/68 /' FLOW-, ~fi~G' ~G P~S~ Ic~~~ OI~BBL. G~~. ,, Used for fuel and flared ' ' 3~.. LIST 0'~' AT~CItMENTS ' WELL STATUS (Producing or shut-in) Workover History here~y certify that the fo~g~going and attached information Is complete and cOrrect as determined from all:available records 33. I s,c,N~m .C/~,~'/~ TiTnEASs't. Area Admin. Supvr mATra 7-24-68 I *(See Instructions and Spaces [°rAdditional Data on Reverse Side) GAS--MCF. WA~BBL. [ GAS-OIL RATIO ! I I WATER--BBL. [ OIL GRAVITY-API (COBR.) [ ,, I 34'60 I TE~T WITNESSED BY INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- merits given in cther spaces on this form and in any attachments. Items 20, and r22.:: If this well is completed for separatc, production from more than one interval zone (multiple completion), so state in item 20, and in item 22 show the prcducing interval, or intervals, 'top(s), bottom(s) and name (s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each adc{itional interval to be seperately produced, show- ing the adlditional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well should show the details of any mul- tiple stage cementing anct the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produc~l. (See instruction for items 20 and 22 above). · ~';AR~' OF FORMATION TESTS 1NcLuDIN(; INTERVAL TKSTED, PRESSURE DATA AND ~{ECOVERIES ~)F OIL, GAS. 3,5. GEOLOGIC M AR K~.~ WATER AND MUD NAME ,, {E DATA, AqvPACII BRIEFS' DESCRIPITIONS OF LITIIOLOGY, POROSITY, FRACTURES. APPAR~ENT DIPS AND DETECTEI) StlOWS OF OIL. GAS Ot:{ WATEtt. · ~ .... ,,. Form ) STATE OF ALASKA S~brnit "Intentions" in Triplicate & "Subsecl~ent Reports" in Duplicate OIL AND GAS CONSERVATION ,COMMITTEE SUNDRY NOTICES AND REPORTS ON W'ELLS (Do not use this form for proposals to drill or to deepen or plug back to a diffierent reservoir, Use "APPLICATION FOR PERiVIIT--" for such proposals.) 0IL ~. GAS WELL WELL ~-~ 2. NAME OF OPERATOR OTHER Pan American Petroleum Corporation ADDRESS OF OPERATOR P. O. Box 779 Anchorage, Alaska LocATIoN. O,F W~L At surface Leg 2, Slot'4, SMGS Platform "D", 699' FSL, 1872' FWL, Sec. 35, T8N, R13W, S.M. 13. ELEVATIONS (Show whether DF, RT, GlO, etc. RKB 100' above MSL 14, Check Appropriate B~x To I~nd, i'c~te Nature of NOtice, Re, ) HLB TI?AR API N~CA_L CODE 50-133- 20058 OKG ADL- 18746 REL ?. IF IIN-OI'A/~. ALLO'J."j.-j~.~.; OR TRIBE NAME F~L_= S. UNIT, FAllNI OR LEASE NA/~E South Middle Ground Shoal 9, V~r~LL NO. 7 10. FL~D ~ POOL, (~R WILD~T South Middle Ground Shoal 11. SEC;, T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 35, T8N, R13W, S.M. 12. ~.:IiM/T lUG. 67-69 tort, or 'Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF I I PULL OR ALTER CASINO FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE JX J ABANDONs REPAIR WELL ~ CHANGE PLANS [IUBSEQUENT REPORT OF: WATER SItUT-OFF REPAIRING WELL J FRACTURE TREATMENT ALTERINO CASING SHOOTING OR ACIDIZINO ABANDONMEN'Ts (Other) (Other) Convert to Injection Well (NOTE: Report results of multiple completion on Well Completion or ReCompletion Report and Log form,) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. We plan to convert this producing well to water injection as per ourapplication of April 16, 1969, File: AMR-967-986v511 and state approval of April 23, 1969. The following additional perforations will be made prior to injecting: 9805-9812; 9895-9905; 9920-9946; 10060-10075; 10120-10155; 10175-10214; 10280-10295; 10320-10330; 10400-10424. The formation will be selectively acidized as follows using Dowell's 12-10 ultra acid with All0 inhibitor and 7 ~ gallons per 1000 W35 Sludge Inhibitor: Interval 10,265 - 10,424 with 6500 gallons Interval 10,050 - 10,214 with 6500 gallons Interval 9,785 - 9,946 with 3500 gallons JULI?lCjJ D~OF OIL/Jt, II)G,~ 16. I hereby c~rti~y t~et-t~fore~ll~f ts t~e and correct CONDITIONS OFAPPEOVAL, ~ i~: TITLE Area Admin. Supervisor DATE 7 / 16 / 69 TITLE See '~nstrucfions On Reverse Side Approve~ ~o!~ Returned REV. STATE OF ALASKA OIL AND OAS CONSERVATION COMMITTEE MONTHLY REPORT OF :DRILLING AND WORKOVER OPERATIONS SUBMIT IN DUPLICATE 1. OIL ~ G A~ ~ WELL ~ WELL 0TH 2. NAME OF OP~TOR Pan American Petroleum Corporation 3, ADDRESS OF OPF~ATOR P. 0. Box 779 - Anchorage, Alaska A~I ~U~EmCA~ Cons 50-133- 20058 LEASE DESIGNATION AND SE1RtAL ADL- 18746 7. IF INDIAN, ALOTTEE OR TRIBE NAME 8, I/NIT,F.~M OR LEASE NAME South Middle Ground Shoal 9. WELL NO. 99501 7 4. LOCATION O'F wk;i~L Leg 2, Slot 4, SMGS Platform 'D'; 699' FSL, i872' FWL, Section 35, T8N, R13W, S.M. 10. FIELD AND POOL, OR WILDCAT South Middle Ground Shoal 11. SEC., T,, R., M., (BOTTOM HOLE OBJ~JTrV~ Sec. 35, TS~, R13W, 8.M. 1~. PE~UVIIT NO. 67-69 13. REPORT TOTAL DEI~TH AT END oF MONTH, CI~NG~.S IN I~OLE SIZE, CASING A/~-D CEACENTING JOBS INCLUDING DEPTH SET AN~ VOLLrNFES USED, PERFORATIONS, TESTS A/ND RESULTS. FISHING JOB~, JLrNK IN HOLE A_ND SIDE-TRACKED HOLE AND ANY O~rIER SIGNIFICANT CI-IAN.~S IN HOL~ CONDITIONS. 7/1 - PBTD 10,695'. Recompleted as a pumping oil well. DIVISION OF M~NSS & M~NF.P-u~5 "' ANCHORAGE ~ ~re is e and i~,. I hereby certify t th sm~r~n _ '. ~ZTU~ Asst. Area Admin. Supvr.DA~ .8-~-6~ NOTE--Repo~ on this form is re~d for each ~lendar month, regardless of the status of operations, anO mu~ ~ file~ in dupli~te with t~ Division of Mines & Minerals by the 15th of the succeeding month, unless othe~i~ dire~ed. Form No. P--4 REV. 9.~D.67 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUBMIT I2q DEPLICATE ~i API NLrMERICAL CODE 50- 133- 20058 6.LEASE DESIGNATION AND SERIAL NO. MONTHLY REPORT OF 'DRILLING AND WORKOVE:R OPERATIONS ADL - 18746 1. T.IF INDIAN, ALOTTEE OR TRIBE NAAIE OIL ~ GAS [] WELL WELL OTHE~ 2. NA.ME OF OP]gR-~TOR Pan American Petroleum Corporation 8. I~'IT,FA1RA~ OR LEASE NAAIE South Middle Ground Shoal Unit 3. ADDRESS OF OPEI:~TOR 9. %VELL NO. P O. Box 779 - Anchorage, Alaska 7 4. LOCA~ON O'F WELL Leg 2, Slot 4, SMGS Platform 'D'; 699' FSL, 1872' FWL, Section 35, T8N, R13W, S.M. 10. ~'I~I.,D AND POOL, OR WILDCAT South Middle Ground Shoal 11. Sl~C., T., R., M.. (BOT'I'OM HOLE OBJtlCTIVE) Sec. 35, T8N, R13W, S.M. 12. PE~q2VIIT NO, 67-69 13. REPORT TOTAL DEPTH AT END OF MONTH, CI-IA/%*GF.S IN HOLE SI~E, CASING A/ND C~YIENTING JOBS INCLUDING DEPTH SET AN~ VOLUMES USED, PERFORATIONS, TESTS A/W-D RESULTS, FISHING JOBS, JUNK IN HOLE A/~D SIDE-TRACKED HOLE AND A~Y OTHER SIGNIFICAi~T CIq. A2~G.F_,S IN HOL~ CONDITIONS. 6/1-30 PBTD 10,695'. Pump testing. RECEIVED JUt... 15 lg68 DIVISION OF MINES & MINIUC~L.$ ANCHORAGE hereby cert~th smmm · · ~Ass't. Area Admin. Supvr. D~.~.~ 7-10-68 NOTE--Report on this form is req~ for each calendar month, regardless of the status of operations, an0 must ~ filed in duplicate with the Division of Mines & Minerals by the 15th of the succeedin9 month~ unless othe~ise directed. Form No. P--4 REV. 9-30-67 STATE O,F ALASKA O~L AND GAS CONSERVATION COMMITTEE SUBMIT IN DEPLICATE MONTHLY REPORT OF 'DRILLING AND WORKOVE:R OPE;RATIONS 5. API NUA~EIR/CAL CODE 50-133- 20058 6. LEASE DESIGNATION AND SERIAL NO. ADL- 18746 ~ 1. 7. IF INDIAN, ALOTTEE OR TRIBE NAME OIL ~ GAS [] OTHER WELL WELL ~. NAiVIE OF 0P'~TOR Pan American Petroleum Corporation 3. ADDRESS O~ OPERATOR P. 0. Box '11,779- Anchora~e~ Alaska 99501 4. LOCATION OF WELL Leg 2, Slot 4, SMGS Platform 'D'; 699' FSL, 1872' FWL, Section 35, T8N, R13W, S.M. 8. U/%'IT,F,~R~M OR LEASE NAAIE South Middle Ground Shoal Unit 9, WELL NO. 10. FiD AND Pf~DL, OR WILDCAT South Middle Ground Shoal 11.. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE ) Sec. 35, T8N, R13W, S.M. 12. PERNIIT NO. 67-69 REPORT TOTAL D]gPTI-I AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND C~VIENTING JOBS INCLUDING DEPTH SET A/WI) VOLUATES USED, PE1RFO.RATIONS, TESTS A/XrD RESULTS, FISHING JOBS. JI/NK IN HOLE A/~D SIDE-TI~ACKED HOLE AD A2~Y OTI-IER SIGNIFICANT CH.A~GF..S IN HOL~ COlkrOITIONS. 5/31 PBTD 10,695'. Pumping with hole equipment. 5/1-6 5/7-8 5/9-13 5/14-17 5/18-20 5/21-31 PBTD 10,235'. Pulled tubing and reran with Kobe pumping equipment. Circulated power oil, swabbed and pumped. Released rig~ Pumped and pump stopped. Moved drilling rig in, pulled tubing and packer, and drilled cement and retainer, cleaning out to 10,658'. Ran CBL 10,658- 7000'. Ran tubing and Kobe equipment. Pulled same. Set wireline packer at 9708' and ran tubing with Kobe cavity set at 9636', anchor at 10,441'. Pumping on Kobe. RECEIVED JUN 1 19g DIVISION OF MINES & MINEP, AL~ ANCHOP, AGE 14. I hel~eby certify that_Jkhe £o.regging is,~ue ~ eo, rrec~ ~Ol£--Report on this form is re~f~tred for each calendar month, regardless of the status o~ operations, anO must be filed in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed. OiL AND GAS CONSERVATION COMMITTEE MONTHLY RE!PORT OF 'DRILLING AND WORKOVER OPERATIONS OYL ~ oAS [] WE~L WELL OT]HER OF OP]~RATOR Pan American Petroleum Corporation 'AI~RE$S OF OPEIRakTOR P. 0. Box 779 - Anchorage, Alaska 99501 4. LOCATION O,F WELL Leg 2, Slot 4, SMGS Platform 'D'; 699' FSL, 1872' FWL, Section 35, T8N, R13W, S.M. u. Ag I Iq [jA'I~.~,..1. c.A.L, (.:(313.: 50-133- 20058 LEASE DESiGNAiION AXD SElqlAL NO. ADL- 18746 7. IF INDIAN, ALO'i 1~ OR TRIBE NAME 8. U/N'IT,FAi~M OR LEASE South Middle Ground Shoal Unit 9. WELL NO. 7 10. FLF~ A.ND POOL, OR WILDCAT South. Middle Ground Shoal i1. SEC., T., 1{., M.. (BOT'TOM HOLE OBJECTIVE) Sec. 35, T8N, R13W, S.M. 12. PERMIT NO. 67-69 '~3.' 'REPORT TOTAL DEPTH AT END OF MONTH, CI-I_4.NGES IN PIOLE SI~E, CASING ANT) CEMENTING JOBS INCLUDING DEPTH SET A/XII) VOLLrMES USED, PERFORATIONS, TESTS ANT) i~ESULTS, FISHING JOinS, JI/NK IN HOLE AND SIDE-TILACI~ED HOLE AND ~NY OTHER SIGNIFICA.NT'CHA/XIGF-~ IN HOL~ CONDITIONS. 4/30 4/25-28 4/29 Prepare to pull tubing. Installing piping for Kobe equipment. Moved on with workover rig. siGmm - ~ , ~ ~ ~TLX ASS ' t. Area Admin. Supvr-mA.,.,-. 5]7/68 i iiiiiii ii iii i NOTE--Report on this form is r red for each calendar month, regardless of the status of operations, and must be file~l in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed. m P--7 f SUBMIT IN DUPLICiL. .... s~TATE OF ALASKA ~See ot~e~ st ructiorls reverse OIL AND GAS CONSERVATION COMMITTEE i -la. TYrE OF WELL: OII; W ELL W ELL 'DR ¥ Other b. TYPE OF COMPLE~ON: hACK n~svs. ~ Other OYEH EN IVELL ~. NAME OF Op~RATO~ Pan ~me riean Pet;:roleum~ Corporation 3. A~DR~SS O~' OPERATOR. "~.- · D L'OG ' WELL cOMPLETION OR RE:COMPLETION PORT AN * i 'P. O. ~B0X"779 i~+ Anchozage, Alaska 99501 ---4-. ~ocavION or wv.~£ .'i~R~or~..:'go6~ti~n a~early aaa'i, accordanee with any State requirements)* .~:~ace Leg 2~ Si0t ~ ~M~GS Platform 'D'; 1872' FWL, .:' ~0~ ~NL:~: 1943~ FWL,. Sec%ion~ 2, T7N, R13W, S.M. 13. ORIGINAJ "J..API NUMERICAL CODE 50-133-20058 6. X.~A~E~7~DESIGNATION A.I%ID SERLAL NO ADL-18746 SMOS 10J F~' ~ P~L, OR ~.~T SO'ut~ Middle Ground ~1. i~C., ';IL"'., R., 1VI., (]3OrI'TOiVJ: j ~ ~Or,;a~crxvm) lSd=C; 2, T7N, R13W, S.~ 1718~:{ FWd,;. Section Z, TTN, Ri]W, S.M. J . :: 67-69 1489' FNL,':.~ ~VA~ONS (D'F, ~.KB, ~T, GR,. ~)* 17. ~r,mV. 11/Z/6~7 ~: RKB 100' MSL~. , ~ 59.4' MSL CO~L.. 21. ~I~TERVALS 'bRILLED BY HOW MANY* C.O, MPLETtOi~I-2rO~, BOTTOM, NA1VIE (MD AND 9785' - 10,400~i::MD i/ Sta]Ce G U~r~it:, Lower Kenai Conglomerate 18. 1~0f750:, Mr) ~. PRoDuCING, LNTI~t~VAL(S), 24. ~ strings set in well) HOLE SIZE ~~'''~gEN''I~I2gG 1250 sx ~ 7-1/Z" 1200 sx 1550 sx SCREEN (MD') ;':: Z0" S~ZE 26. :7::~ ~ ', SIZE BOTTOM (lVl~) 28. 't CABLE TOOLS 23. WAS DIlq~ECkkONAL SURVES/' MADE ! A.1VIO~ PULLED (interval, size and humbem) 27.. TUBIN~ SIZE DEP'I~ SET (MD) J PACKER ~ET (1VID) '06,' .&ciD, SP!OT, FT/~CTLrHE, C',~2dE~T SQuEm~,E, ETC. PRODUCTION METHOD (Flowing, gas lif{7'pumping--size and type of pump) I WELL STATUS (Producin~ or I shut-in) 68 ~ - Flowin J Produc lng ..' 24/6 ': ~ 1263 OAS (~ol~, ~,ed for uel, vented, etc.) ~ WITNESSED BY GAS--I~CF. WATER--BBL. J GAS-OIL lq~_TIO J TEST Flared :- - , "' .1 History, Directi°'n~¥ C°ntr0i' Data, ~s"~°g Ti~,~A~s'~~.,, A~:~a Admin. Supvr. .ATE 2/16/ 68 _ -- "~':'~'~'"-.:,: .... *(See Instructions and Spaces 1:o~ Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete.and correct well comple'tion report and log on all types of lands and leases in Alas'ko. ,~ ~_ Item: '16: Indicate which eleVation is us_~d as r.~eference (wh~ere not otherwise rfients given ih ct:her spaces~ on this form' and in any attachments. Items 20,.~nd 22:1 If this well is completed for separate production from more than one interval zone (muir!Pie completion), so state in item 2'0, and in item 22-show the p~c.Juci~g ~'interval, or intervals, ','7op(s.L. bottOm(s) and name (s) (if any) for only the interval reported in itern 30. Submit.~.a separate report (page)- on this form, adequat~ely identifi-ed, for each ad6itlon%l interval to be sepe~rat~'ly,.:produced, show- i:ng the additional data pertinent to such interval · Item2~: "Sacks Cemer~i": Attached supplemen~t:~l records for this well should sho~.['tF~e d~tails of any mul- tiple s~tage c~menting and the lactation qf the'i~ementing tool. Item 28: .s,ut~ynit a separate completion report on this fo~:/-n :~or:~each interval to i1~ ,separately produc~. (See instruction For iter~s 20 and 22 above). i{M'ARY OF FORA~ATION TF_~TS INCI"~U Di N(;"iNTERVAL 'FF~TED, F~E~URE DATA ~'~ovEI{:IF.S OF OIL, GAS.- - 35. G~GIC WAT~t AND M~D ' NAME - M~AS, NONE ~ State A 7750' 753~' . Hemlock 9772' 9478' , DATA. A~ACII B~IE? ~D~CRIPI~O~80~ LITIlOLOGY. ~O~osITY. F~&C~. APP~T DIPS ~ND DETECTEI) SIlOWS O~ OIL, GAS O~ W~T~I. NONE ; Chronological Well History ;',.- , * · ........ SMGS Unit No. 7 11/2/67 11/3-6/67 11/7-22/67 12/13-15/67 lZ/16/67 to 1/15/68 1/17-18/68 1/1~-23/68 1/24-27/68 1/28/68 Spudded below 20" casing set 7/24/67 at 650' with 1250 sx. Drilled 12-1/4" hole 2010'; set 13-3/8" casing at 1988' with 1200 sx. Drilled 12-1/4" hole 6788'. Set cement plug 5200- 5500' with 250 sx and set bridge plug at 1900'. Skidded rig . well temporarily suspended. Operations commenced. Drilled bridge plug at 1900' and side-tracked hole at 5105'. Drilled 12-1/4" hole to TD 10,750' and log formation tops. Ran 9-5/8" casing set at 10,734. 57' and cemented with 1550 sx. PBTD 10,695'. Perforated 'intervals between 9785' and 10,400'. Ran dual string tubing and set at 10,421' with packer at 9706'. Rig released and well completed as single zone, dual string, flowing oil well. Chronological Well History SMGS Unit No. 7-Workover 4/2-8/68 4/9-30/68 5/1-6/68 5/7-8/68 5/9-13/68 5/14-17/68 5/i8-20/68 5/21768 to 6/30/68 PBTD 10,695'. Pulled tubing strings, set retainer at 10,245' with 2-1/2 sx above, perforated 9860- 9870' with 4 jspf and reran tubing with Kobe equipment. PBTD 10,235'. Swabbed, well died, suspended work on well and installed surface Kobe equipment. Pulled tubing and reran with Kobe pumping equipment~ Circulated power oil, swabbed and pumped. Released rig. Pumped and pump stopped. Moved drilling rig in, pulled tubing and packer, and drilled cement and retainer, cleaning out to 10,658' Ran CBL 10,658-7000'. Ran tubing and Kobe equipment.~ Pulled same. Set wireline packer at 9708' and ran tubing with Kobe cavity set at 9636', anchor at 10,441'. Pump tested. 7/1/68 - Completed as a pumping oil well. Chronological Well History SM©S Unit No. 7 11/2/67 11/3-6/67 11/7-22/67 12/13-15/67 12/16/67 to 1/15/68 1/17-18/68 1/19-23/68 1/24-27/68 1/28/68 Spudded below 20" casing set 7/24/67 at 650' with 1250 sx. Drilled 12-1/4" hole 2010'; set 13-3/'8" casing at 1988' with 1200 sx. Drilled i2-1/4" hole 6788'. Set cement plug 5200- 5500' with 250 s× and set bridge plug at 1900'. Skidded rig - well temporarily suspended. Operations commenced. Drilled bridge plug at 1900' and side-tracked hole at 5105'. Drilled 12-1/4" hole to TD 10,750' and log formation tops. Ran 9-5/8" casing set at 10,734.57' and cemented with 1550 sx. PBTD I0,695'. l~erforated intervals between 9785' and 10,400'. Ran dual string tubing and set at 10,421'-with packer at 9706'. Rig released and well completed as single zone, dual string, flowing oil well. '.~ _'~..".~!>.... · . ' '. A~'U'L I '. ~. '. :,?~-"'i ~. ..... ..~. ' . ' c,.,,,~.,.., t~_~m~', ~T.' CORp'. -s,"[~' '" :"" ~':'":" ...':.. ... "'''.'' ,o. /: ~.... . .i ~ /=1~.~ ... . ...~ :... ...:::..~ . . .~.. ~.: ' .. -.. ............ · . ,..- ' -~o.~.:Eo.-. ~ .-.. ~:,'~1 "'~':~'-'/ · .' :-.:."-,. '" .' .... "· :"'" '- · ..... D~T[ -...' '-~.-: .-'."~-.'!,'~...~'~.~ '7' "~?"' ' ~ ' "- '....,,,%, ':, ~u.~ " ' · "" -" ' "' ' · ':":'"' ';'- ": ."":::' ~ .' '":.'. :.':' ":.:-'"' ' :':.)::':": :':':.:}"';,'., '}-' .. ('".:: COR;~'~ST:~D ':'/ DEPTH' VERTICAL ,DEPTH A.GLE "DIRECTION 5F:'INCLI'NATION MEASURED COU,SE DISPL~CE"ENT ' ' ,,,,,:', TOTAL .DISPLACE~;'EN' · / · ' OF COURSE · · ' . ~-~I.~E-;-..:- ' · · ' ....... _, . . ;, . , .' ../ . ...... ..... INCLIN- DEV. - '- ....... ..-.?~.,..-.. : , : . . ....,.. ... . ' . .,. .. , . ,. ,:} · , ';' . · : . . '. '. . .: :.. · . .. : , · ....' ." .-.; ,,'. ' · ....J-:~,,.....:.'- ........ . .. .... . -. ,... :... .. , ...~.....,...7~ ' -i~7~4~..:~,.:; I0°:, ~oO.'.: ,. ~79; ~!~ 79-¢;.,~:~ii .. 4~/~ . ..; .:. '.. , .." :::':~;: .-:~: 'v,..-.-'.:.,~, ' ~. :.'~.~.-.:...: ~-...! ~ ;?Ld .:,~;'6'i:: '."',"i '.' '. ": .:'~ '~":"',.":::.7~,:"~' ::7~'.:~;:"-:-~..;"..~O0;.':q'¢;~S "q'?~; ~>~2 .~.: .L...-...."' -:;::'.:::-?'.":.;:-...'.',:::...'.X: :.' ;:..~' .~:: ~"~'}.:.[": '"%,.7X.. "~'"'::'~ ..... :' ~/¢2b';;.. ....:~';: :~?::~;m~ :"9¢/¢ '9~,'¢:~. ~" ~."..7 '-' ' "'" '?'';';'' '"'L":':'" ';;"":" :" '": ::;'~ :29. ~'"'.::,~" :;,':.:J': //,~'.~ '¢"~. :.:.::-:,-, :..... ?.:.' :W.;?.~'~:~,'.~. v . . 4...".~.~; .. :...,.c...., ,... ,:,.., :.. ~z~~ '/;LIS'-' ~X,I. ':~4.F2:~' .... .-:.:.....'./zoo' '-..¢2,z~.. '].~'¢s;~'¢. 7~.¢~/,. .. .... , .?,, ...... ......,_ .~,.~. k:~- ' ........ ., .... : : · ~-..:. ., . .....,...o z, ,-. : i7.~.4,; .~.~? ":..~',",--~:.'.,'.-..~v~:tq.':~3 ~-... .... · ....... .,.~,~..':'..:':-.. '.~,, ~.': '-::., ,¢4;°',j ..V~;sq. r.. ~ "~'~,:.o · .?~.~o. · ./5'~ ~7,~,/.~ -/.~'?,r;7_~:' '7~" 7' -"' ..: '-'~ '.:'. :' .'~"/.¢"~ .~;:o.~.'. c~.. ,; ....... . . .'. ',~,¢?~'~" . :'.~.'!:~o -~/¢~¢ /~ FY,/,3 .'/~'/~ " ' ~-,% . ./~9..."~¢1E ...~. I~Z¢i'.~ ~ ............. '' ' : '.' ', '.'" ":'-:"-"' ;.' :Z 9&-~-d ' ~t~:'~:~.'~',.'-:' .~: 'i.7~.O ..zM~Z:/77-t7~ /7 . :'-~ ~'-':' ?"/~7'-.:!;:~... o" ~-' ¢.O~". :x,~;.-- :' '.'"..:'."'.::.: '.~2.Z,',~S ',7~;'1/:: ·/~'~;,~80;'~/zn /¢'0~¢ 9d.~ .~.,., . . "~¥~ ....  ,. ~ . - · . ~:~:~':-::~0: /'¢~d..z~. ,~- ) 2~ IZ',,/~:¢/~ .... "' :~,~, ::., d,1.%': r~Z~ ~ z? ~,~" ¢:i '.'-' '-,-.~.,~.-:':....,-=5'7::~,~ -:.~t.~?:~,"-&~: ....,~.~ ;:.'.~',-.,.,.,. ::". -', ..':;~.:,~:.', '.. ~..~;?-: t.:.. ..... '-.' -,: ;: .:c,.'.~,.:.~'t ?7';':'~?:~,';?~?~t~, ' , :~..- .-,:,s~. 7" ~;::-' .'-'." ': ;':: :',:; .:.';,'"Z'~ .:~'-';P~?' ;. ' ." "::-; ~ ~,:" .,Z~?: .;.~, :;:J?:¢:';~-~ '.~X.7 ~";';~';~;~d-' .... :~ .' ':~'(?~ - -- ~ ..... :' ~ ..... ' ........ "" , ' ' 'i ' ~' .... *"i' : '" '~'"-' ' '? '""'~' '~' ' ~" ' "' /':' ~ '~'' ~- -~' '?- " ,,'~ ',~. '%C~':' ~:-~,. - ~' . ~ ~- -;',~ ~,," · i ! ~ 1 ' _ ."-' '~-,' t' : - .............. ~ ...... ~ ......... ............... L -: ............. ,~ ................. -, - .................................... ' ' . ...... ~ ~' ...... . ........ z ........ ~ . · . ;: ;':': .. , '. ,.- .. · .: ...... ...... ' .:!::..:, . ..:.;'. :.--..: i- ::.::,?~:!:~::t' ~."" ..-;".: '.'- .- . .' ";,X..' ::;:.::~-':' _ . ,j i:..:.. - , ~:,;:;.;::??' .. :. Ii.: .... .. ..- " ' . - }6 : . : -'--:-. .'" ..: .... .,:.~fi; .-.3?.. ':-:,. ;'.. -':~ . .~'%' ~ 'Z' ':. ' - .' '- ~ c.:. '.'. '.:.., C:..'4-. ;.%' :': ." >,'-'-': '.-7."'.;. "{-:"-7 ." ?:' :'":} ':~' :""'~ :¢':': ~.. ./;,~ ..-.: '::-: .....:...... :.- ...... .~--:--! <:..;: ;~:-.-: ..... ;? - ..,...~,_.~,...-.. · .... · . . -2.,G 7::?',,J.?.': ,,-..,.,:::.-.-:~.: .~., .,... ::..:. :-t:'::~,:.;-dt-?~!~ i: . ~. ".-: '-.'-'-. ~ '; - ,':!: .. '. ..... ..' _.. · ..: . .' ~': .:~,. . .- . ; . .!.-:,:i, :.....,... '... . . · .. ~.:' .:.-. '.,-.: ~. '.. -::.- .; - ..,,. : *,'-;'-,7..':;.%' .. .......... · ., ~.' . : · PAN AMERICAN PETROLEUM CORPORATION . . . . DIRECTIONAL CONTROL ~-- - Form N'o, P--4 REV. 9-30-6'; STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE ~AONT'HLY REPORT OF :DRILLING AND WORKOVER OPERATIONS 0IL ~ GAB [] WELL WELL OTHER 2. NAME OF OPERATOR Pan American Petroleum Corporation 3. ADDRESS OF OPER2kTOR P. O, Box 779 - Anchorage, Alaska 99501 4. LO'CATION O'F WELL Leg 2, Slot 4, SMGS Platform 'D'; 699' FSL, 1872' FWL, Section.35, TSN, R13W, S.M. SUBMI'T IN DEPLICATE APl NLS~ERICAL CODE 50-133-20058 6. LEASE DESIGNATION AND SEEIAL NO. ADL-18746 ~. IF INDIAN, ALOTTEE OR TRIBE NAAIE 8. U'NIT,FA/~M OR LEASE NA3.IE SMGS Unit 9, WELL NO. 10. FIELD AND POOL, OR WILDCAT South Middle Ground Shoal 11. SEC., T., R., M., (BO/~FO!VI HOLE OBJECTIVE) Sec. Z, TTN, R13W, S.M. 12. PIeR.MIT NO. 67-69 13, REPORT TOTAL DE3PTH AT END OF MONTH, CtLkNGES IN HOLE SIZE, CASING ~ CE!ViENTING JOBS INCLUDING DEPTH SET ~ VOLU/VIE$ USED, PERFORATIONS, TESTS ANT) RESULTS, FISHING JOBS, JU/~K IN HOLE AND SIDE-TE~CKED HOLE AND A_NY OTHER SIGNIFICANT CI4_A~G~ IN HOL~ CONDITIONS, 1/28 1/1-16 1/17-18 1/19-Z3 1/24-27 Well completed as single zone, dual string, flowing oil well. Drilled 12-1/4" hole to TD 10, 750' and logged formation tops. Ran 9-5/8" casing set at 10,734. 57' and cemented with 1550'sx. PBTD 10,695'. Perforated intervals between 9785' and 10,400'. Ran dual string tubing and set at 10,421' with packer at 9706'.. RECEIVED FEB 1 DIVISION OF MINES & MINERAL5 ANCHOEA®E 14. I certify that the correct s~Gm ~-~'" u~Asst. AreaAdmin. Supvr. r~A'~-.~ 2/12/68 form i~,~quired for each calendar month, regardless of the status of operations, and must be filed in duplicate NOTEmReport on this with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed. .Form No, P--4 lq, EV. 9-30-67 STATE OF ALASKA SUSM~ IN D~LIC*~ OiL AND GAS CONSERVATION COMMITTEE MONTHLY ~REPORT O'F DRILLING AND WO.RKOVER OPERATIONS OIL ~ GAS ~-~ WELL WELL OTHEE 2. NA~VfE O1~' (~P~TOR Pan American Petroleum Corporation 3. ADDRESS OF OPERATOR P. O. Box 779 - Anchorage, Alaska 99501 4.LOCAT~ION OF WTM Leg 2, Slot 4, SMGS Platform 'D'; 699'FSL, 1872'FWL, Section 35, T8N, R13W, S.M. APl NUA{ERICAL CODE 50-133-20058 6. L~SE DESIGNATION AND S~IAL NO. ADL - 18746 7. IF INDIAN, ALOTTEE OR TRIBE NASIE 8. LrNIT,FA-RA¢ OR LEASE NAAIE SMGS Unit 9. %VELL NO. 10. Fi~:hD AND POOL, OR WILDCAT South 1V~iddle Ground Shoal 11. SI~C,, T., R., A'I., (BOTTOM HOLE OBJECTIVE) sec. 2, T7N, R13W, S.M. 1~.. PER/VIIT NO. 67-69 13, REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING A-N-D CKNIENTING JOBS INCLUDING DEPTH SET AND VOLUNfES USED, PERFORATIONS, TESTS A.ND RESULTS, FISHING JOBS, JLrNK IN HOLE A-ND SIDE-T-I~ACKED HOLE AND A_NY OTHER SIGNIFICANT CI-IANGES IN HOL~ CONDITIONS. lZ/31 lZ/1-12 12/13 lZ/14-30 TD 8448'. Drilling. TD 6788'. Temporarily suspended. Skid in drilling rig and rig up. Drilled 12-1/4" hole ~'~ 6788'-8448'. · smw~ urn~A s s't. Area Admin. Supvr. nA.~.t 1/5/68 NOTE--Report on this form is uJred for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed. F~rm 1~o. P---4 'STATE OF ALASKA SUBMIT IN DEPLICATE OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF ~DRILLING AND WORKOVER OPERATIONS ~7 Api ~Emc~ CODE 50-133-20058.. · ~'. NA_~E OF OP~TOR Pan American Petroleum Corporation 3. ADDRESS OF OPEI~TOR 6. LEASE DESIGNATION AND SEEIAL NO. ADL - 18746 1. 7. IF INDIAN, ALOTTEE OR TRIBE NASIE 0IL ~ GAS ~ WELL WELL 0Tl:l ER 8. U2%'IT,F.~:LM OR LEASE N.~ME SMGS Unit P. O. ]Box 779 - Anchorage, Alaska 99501 ~ :LO,CAFtaN O'F WEL~ Leg 2, Slot 4, SMGS Platform D; 1872' FWL, 699' FSL, Section 35, T8N, R13W, S.M. 9. WELL NO. 10. FIF. I.I') A_ND POOL, OR WILDCAT South Middle Ground Shoal 11. SEC., T., R., M., [BO~FOM HOLE OBJECTIVE) Sec. 2, T7N, R13W, S.M. l~. PI~ITNO, 67-69 13. REPORT TOTAL DEPTH AT END OF MONTH, CI-IANGES IN HOLE SI~E, CASING AND CEMENTING JOBS INCLL'DING DEPTH SET A24'1) VOLLrM-ES USED, PEi~FORATIONS, TE~TS A/XFD lqlgSULTS, FISHING JOBS, JIJ/~K LN HOLE A.ND SIDE-TRACKED HOLE AI~D ANY OTHER SIGNIFICA/%IT CI-IA/~F,S IN HOLI~ CONT)ITIONS. n/30 TD 6788'. Temporarily suspended. 11/3 11/6-Zl Move on workover rig and spud below 20" casing. Drilled 17-1/2" hole to 2010' and set 13-3/8" casing at 1988' with 1200 sx. Drilled 12-1/4" hole to 6788'; set 250 sx open hole plug 5200-5500' and released rig. RECEIVED DIVISION Of: MINES & MINERAL~ ANCHORAGE[ iQ. I hereby certify that the for;~ng isle and correct .smmm C-..~[. /~'~ .. a~TLEAss't. AreaAdmin. Su.pvr.~A,,.~ !2/11/6V. NOTE--Report on tl~is form is required for each calendar month, regardless of the status of operations, and must be filecI in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed, I=ORM 470 2-57 '/ 3' ) ? PAN AMERICAN PETROLEUM COPPO ION P. O. Box 779 Anchorage, 'Alaska 99501 November 3, 1967 . File: FKK-145Z-WF Re::. Spud New Well - SMGS Unit #7 Director Division of Lands .. State of Alaska .~ ' Department of Natural Resources 344 Sixth Avenue .. Anchorage, Alaska' Dear Sir: This is to nOtify you that the subject well was spudded on State Lease ADL - 18746 at 1900 hours on NOvember 2, 1967. The surface location of this'well is at SE/4 SW/4, Section 35, T8N, R13W, S.M. ' We plan to drill this well directionally to a bottom hole location of SE/4 NW/4, Section 2,:T7N, R13W, S.M. Yours very truly, F. K. Krebill Area Superintendent cc: Div. of Mines & Minerals 3001 Porcupine Drive Anchorage, Alaska RECEIV[D NOV 13 1967 DI¥t~JON OI~ MIN~:$ & MiNg~ FORM SA.- I B 125.5M 8/67 MEMO:RANDUM state of Alaska DATE : SUBJECT{ FORM S,m - lB 12.5.5M ~/67 MEMORANDUM FROM: Sta'te- .of Alaska DATE : ~ ~. ~ SUBJECT, .. STATE OF ALASKA SUBMIT IH Till pATE* (Other instructions on reverse side) AP1 50-133-20058 Effective: July 1, 1964 OIL AND GAS CONSERVATION COMMITTEE APPLICATION .FOR PERMIT TO DRILL, DEEPEN, OR PLUG BACK la. TYPE OF WORK DRILL [] WELL WELL OTHER ZONE 2. NAME OF OPERATOR Pan American Petroleum Corp. 3. ADDRESS OF OPERATOR P. O. Box 779 DEEPEN I-I PLUG BACK I-I MULTIPLE ~-~ ZONE 4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements.* ) At surface Leg 2, Slot 4, SMGS Platform D; 699' FSL, 1872' FWL, S c' 35, TSN, R13W, S.M. At proposed proud. ~one 1820' FNL, 1820' FWL, Sec. 2, TTN, R, 13,W, S.M. 14. DISTANCE IN MILES ANn DIRECTION FROM NEAREST TOWN OR POST Orli'xeE* 15-1/2 miles NNW of Kenai LEASE DESIGNATION' AND SERIAL NO ADL- 18746 6. IF INDIAN, ALLOTTEE OR TRIBE NAME 7. UNIT AGREEMENT NAME South Middle Ground Shoal 3, FARM OR LEASE NAME Unil SMGS Unit WELL NO. 7 10. FIELD AND POOL, OR WILDCAT South Middle Ground Shoal 11. SEC., T., a., M., Ga BLK. AND SURVEY Git AREA BHL:Sec. 2, T7N, R13W, 12. BDROUGH SH] 13. SPATE KenaiJ Alas ka l~. ri,STANCE ,aO~ PROPOSED' LOCAT,ON To NEAREST 3525' N & W of Unit PROPEBTY OR LEASE LINE, FT. (Also to nearest drlg. unit line, if any) boundary iS. DISTANCE FROM PROPOSED LOCATION* 1640' SE of TO NEAREST WELL, DRILLING, COMPLETED, oR ~P--ED ,GE, ox THIS ,.-.aSR, ~. SMGS Unit No. 3 16. NO. OF ACRES IN LEASE 17. NO. OF ACRES ASSIONED TO THIS WELL 4160 8O 19. PROPOSED DEPTH 10,500' 20. ROTARY OR CABLE TOOLS Rotary 21. ELEVATIONS (Show whether DF, ET, GE, etc,) { 22. APPROX. DATE WORK WILL START* Estimated RKB 100' above MSL ] November 2, 1967 23. PROPOSED CASING AND CEMENTING PROGRAM SIZE OF HOLE SIZE OF CASING SETTING DEPTH QUANTITY OF CEMENT 26" 20" 600' Circulate to surface 17-1/2" 13-3/8" 2000' 10500' 12-1/4" 9-5/8" WEIGHT PER FOOT Circulate to surface Minimum 500' above shoe i. Deviation required to reach BHL from permanent platform. 2. There are no affected operators. 3. BOP specifications attached. 4. Intervals of interest will be perforated and may be stimulated. IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to deepen or plug back, give data on present productive zone and proposed new productive zone. If proposal is to drill or deepen directionally, give pertinent data on subsurface locations and measured and true vertical depths. Give blowout preventer program, if any. e~t t~he~ re~o~:ue an~~d Correct. 24. I hereby c o sIGN'D '~ '~ ~' /~-J [t TITLE Ass't. Area Admin. Supvr. (This space for Federal or S~te office use) 10/31/67 APPROVAL DATE THOMAS R. MARSHALL, JR. TITLE J~cuSJv~ Alaska Oil & Oas Consel%,atJon Committee R E C'E I V'E O AP1 50-133-20058 *See Instructions On Reverse Side OCT 31 DIVISION OF MINES & MtlNERAL~ ANCHORAGE 27 LEG. NO. I $4 $ LAT. 60°44' 08.16" LONG. 151° 30' 45.85" Y = 2,463,917 X = 229~;>66 FROM S.~V. COR. 745' NORTH & 1818' EAST 26 35 $5 17651 SEWARD HER LEG. NO. 2 LEG. NO. 3 LAT. 60°44' 07.72" LAT. 60° 44' 07.08" LONG. 151° :50' 44.78" LONG. 151° 30' 45.86" Y = 2,465,871 Y = 2,465~807 X = 229, :519 X = P29,26:5 FROM S.W COR. FROM S.W. cot. 699' NORTH ~ 653' NORTH (~ 1872' EAST 1818' EAST I I I TSN IDIAN ALASKA T 7 N Z6 :5¸5 :55 SCALE' I"=1000' 2 LEG. NO. 4 ~?, LAT. 60° 44' 07.52" LONG. 151o $0' 46.94" Y = 2,46:5, 85:5 X = 229,2.11 FROM S.W COR. 678' NORTH 1765' EAST 2'5 :56 I CERTIFICATE OF SURVEYOR I hereby certify that I am properly registered and licensed to practice land surveying in the State of Alaska and that this plat represents a location survey made by me or under my supervision and that all dimensions and other details are correct. Date - / Surveyor ~ FINAL PLAT OF S.M.G.S. PLATFORM "D" LOCATED IN SE I/4 SW I/4, PROTRACTED SEC. :55, 13Wt$.M. SURVEYED FOR SURVEYORS NOTE The location of S.M.G.S. by use of U.S.C. ~ G.S. Light", and "Boulder" ii ii Platform D was accomplished "Co stations st", "East Fore~and and C.E.T. 18 (Offset 2 ) PAN AMERICAN PETROLEUM CORP. EO. BOX 779 ANCHORAGE, ALASKA SURVEYED BY F M. LINDSEY 8~ ASSOC. LAND SURVEYORS 8~ CIVIL ENGINEERS 3ZOI ARCTIC BLVD. ANCHORAGE, ALASKA 8 N~ T. 7 N. Lq D ADL 18744 .ADL 1874 6 ADL 18750 Federal leases State leases Total F PAN AMERICAN-- SKELLY-SINCLAIR- PHILLIPS 34 ADL 18750 ,. R. 13 W. A PAN AMERICAN- SINCLAIR- PH ' E ADL/8744 0 Ac,. 4160 Ac. 4160 Acres TRACT BOUNDARY TRACT NUMBER R. ISW. EXHIBIT "A" TO ACCOMPANY SOUTH MIDDLE GROUND SF:oAL UNIT COOK INLET BASIN, ALASKA 0 1/2 I i. .; ' ' .'-:' 't..~~ .... t ......... MILES Flow line ,i t i ~,-.~-F'.'.II up line I --o----Pipe Rams 2" Check Valve Spool 4" plug or ' tgaue valve / 2"Plug. :, atve 2" Plug or Gate .Valve i-2" Plug Va!Po on side out t'e ~ %quipment below this point furnished by Pan ~un. 4" pzug vsive 4" line w/shop made sw,'~e~) w/no more than 45° bend B lank rams ~ 2" line · Gouge o- plug valve~ 2" ~"~ plug valve -- thru 1 -+--2" plug valve "'g-,--- 2" line 2" choke i. All preventors to be hydraulically operated from an accumulator which will open and close hydril a~ i'e'asn =hree times ~:withoug recharging. 2. All equipment thru which bit must pass to have at least as large iD as casing being drilled through. 3. Kelly cock :o be on Kelly from time of sp~d. , 4. Drill pipe safety valve equivalenn to Shaffef Mod. 55 or 0MSCO, with proper conr, ections, to b~ on rig floor a~ ail ~imes. . 5. All equiomen~ mentioned above to be 50000 WP or stronger. 6. All connections to be flanged, 7. Operating manifold to be in'easy reach of drillers ~gation w/% remote operating' S~a~ion. ,' .,