Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout216-094Guhl, Meredith D (DOA) From: Guhl, Meredith D (DOA) Sent: Friday, August 31, 2018 10:55 AM To: 'Lee, David U Cc: Davies, Stephen F (DOA); Boyer, David L (DOA); Loepp, Victoria T (DOA) Subject: Expired Permit to Drill: CRU CD5-99 L1 Hello David, The permit to drill 216-094, CRU CD5-99 L1, issued to ConocoPhillips Alaska, has expired under Regulation 20 AAC 25.005 . The PTDs will be marked expired in the AOGCC database. If you have any questions, please contact me. Thank you, Meredith Meredith Guhl Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission 333 W. 7th Ave, Anchorage, AK 99501 meredith.guhl@alaska.gov Direct: (907) 793-1235 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at 907-793-1235 or meredith.guhl@alaska.gov. THE STATE Oft 1LASKA GOVERNOR BILL WALKER Chip Alvord Drilling Manager ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaskc.gov Re: Colville River Field, Alpine Oil Pool, CRU CD5-99L1 ConocoPhillips Alaska, Inc. Permit to Drill Number: 216-094 Surface Location: 287' FNL, 2421' FEL, SEC. 18, T11N, R4E, UM Bottomhole Location: 794' FNL, 1683' FEL, SEC. 34, T11N, R4E, UM Dear Mr. Alvord: Enclosed is the approved application for permit to re -drill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 216-093, API No. 50-103- 20748-00-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy . Foerster Chair DATED this Lgd-a y of August, 2016. STATE OF ALASKA AL A OIL AND GAS CONSERVATION COMM PERMIT TO DRILL 20 AAC 25.005 RECEIVED ON JUL 2 5 2016 1 a. Type of Work: 1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp 1 c. gWtj - 6il is proposed for: Drill El Lateral ❑ Stratigraphic Test ❑ Development - Oil El Service - Winj ❑ Single Zone Coalbed Gas ❑ Gas Hydrates ❑ Redrill ❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone L 1 Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket ❑� Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska, Inc. Bond No. 59-52-180 CRU CD5-99L1 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 27000 TVD: 7576 Colville River Unit Alpine Pool 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Surface: 287' FNL, 2421' FEL, Sec. 18, T1IN, R4E, UM ASRC-NPR2, ASRC-NPR4, ADL387208, ADL387209 ` Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2165' FNL, 1283' FEL, Sec. 21, T11N, R4E, UM 932128, 932669, 932193, 932195 8/15/2016 9. Acres in Property: 14. Distance to Nearest Property: Total Depth: 794' FNL, 1683' FEL, Sec. 34, T11N, R4E, UM 8838, 5032, 1146, 640 - 1685' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 70.2 . 15. Distance to Nearest Well Open Surface: x- 349559 y- 5965921 Zone- 4 GL Elevation above MSL (ft): 33.9 . to Same Pool: 1309' 16. Deviated wells: Kickoff depth: ,48�596feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 89 degrees • Downhole: 3714 * Surface: 2945 ' 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42" 20" 94 H-40 Welded 80 36 36 116 116 10 yds. 13-1/2" 10-3/4" 45.5 L-80 H-563/BTC 2351 36 36 2351 2185 354bbl 11.0ppg, 56.3bbl 15.8 ppg G 9-7/8 x 11" 7-5/8" 29.7 L-80 H-563/BTC 17290 36 36 17290 7602 168 bbl 15.8 Class G 6-3/4" 4-1/2" 12.6 L-80 TXP 10414 15686 7468 27000 7576 n/a - uncemented liner with pert pups 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program ❑✓ Time v. Depth Plot ❑ Shallow Hazard Analysis[] Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program ❑✓ 20 AAC 25.050 requirements 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not David Lee 263-3741 be deviated from without prior written approval. Contact David. L. Lee(abcop.com Email Printed Name Chip Alvord Title Drilling Manager Signature (_h5 e 265-6120 Date z 2 20 / Commission Use Only Permit to Drill API Number: Permit Approv See cover letter for other Number: " ( 50- 103 Date: ` 1 requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane gas hydrates, or gas contained in shales: Other: 13U f �C 5 f fd .3 5 U U ).� 5 ) y Samples req'd: Yes Nov Mud log req'd: Yes ❑ Nov UU S l� � Z /� {� Yl vl Ry� ✓C✓t } t p Z J p HZS measures: Yes No❑ Directional svy req'd: Yes No Spacing exception req'd: Yes ❑ Now Inclination -only svy req'd: Yes ❑ Nov Post initial injection MIT req'd: Yes ❑ Nov U APPROVED BY p Approved by COMMISSIONER THE COMMISSION Date: D —lt'— �I ^ y lr !OR L` LI Submit Form and Form �0-}01(Rvised�11/2015) p�bifNAL onthsfrom the date of approval (20 AAC 25.005(g)) Attachments in Duplicate ////L�. �ld�/�� ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 July 22, 2016 Alaska Oil and Gas Conservation Commission 333 West Th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Application for Permit to Drill CRU CD5-99L1 Dear Sir or Madam: lvl� ConocoPhillips E E A V E D JUL 2 5 2016 0GCC ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore production well from the CD5 drilling pad with rig Doyon 19. The intended spud date for this well is 8/15/16. CRU CD5-99L1 is planned to be an Alpine C Sand upper lateral drilled out of the C135-99 parent well (covered in separate PTD). When the CD5-99L1 is commenced, the parent well will have run and cemented 10-3/4" surface casing to above the C30 Sand. 7-5/8" intermediate casing will have been run and cemented to 500' above the uppermost hydrocarbon bearing interval. A 6-3/4" lateral will have been drilled in the Alpine A Sand and 4-1/2" solid liner with frac ports run across the productive interval. A whipstock will have been set above for the CD5-99L1 kickoff in the Alpine C Sand. The CD5-99L 16-3/4" lateral will then be horizontally drilled in the Alpine C sand. This lateral will be completed with a 4-1/2" liner that will be dropped off just out side of the window (no junction tieing the L1 lateral back to the motherbore). A 3.5" upper completion will then be run. A waiver is requested to set the Alpine A Sand production packer within 100' of the Alpine C sand window as per 20 AAC 25.283 (c). The prodution packer will be —50' below the Alpine C Sand window. Please find attached the information required by 20 AAC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 Application for Permit to Drill per 20 AAC 25.005 (a) 2. A proposed drilling program 3. A proposed completion diagram 4. A drilling fluids program summary 5. Pressure information as required by 20 AAC 25.035 (d)(2) 6. Directional drilling / collision avoidance information as required by 20 AAC 25.050 (b) Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 AAC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information, please contact David Lee at 263-3741 (David.L.Lee(&cop.com) or Chip Alvord at 265-6120. Si rely, cc: CD5-99 Well File / Ann Haggerty-Sherrod ATO 1530 Johnson Njoku ATO 1720 Chip Alvord ATO 1570 David Lee Jason McLennan ATO 1712 Drilling Engineer Lanston Chin Kuukpik Corp Applicatic Permit to Drill, Well CRU CD5-991-1 Saved: 22-Jul-16 CD5-99L1 Application for Permit to Drill Document Table of Contents 1. Well Name (Requirements of 20 AAC 25. 005 0)............................................................ 3 2. Location Summary (Requirements of 20 AAC 25.005(c)(2))............................................ 3 Requirements of 20 AAC 25.050(b)............................................................................................................. 3 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005(c)(3)) 3 4. Drilling Hazards Information (Requirements of20AAC 25.005 (c)(4)) ........................ 4 5. Procedure for Conducting Formation Integrity Tests (Requirements of'20 AAC 25.005 (c) (5))......................................................................................................................... 5 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) .......... 5 7. Diverter System Information (Requirements of'20 AAC 25.005(c)(7)) ......................... 5 8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8)).................................... 6 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005 (c)(9)) ................................................................................................................................... 7 10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10))......................................... 7 11. Seabed Condition Analysis (Requirements of20AAC 25.005 (c)(11)) ........................7 12. Evidence of Bonding (Requirements of 20 AAC 25.005 (c)(12))................................... 7 13. Proposed Drilling Program (Requirements of20AAC25.005(c)(13)).........................7 14. Discussion of Mud and Cuttings Disposal and Annular Disposal ....................... 8 (Requirements of 20 AAC 25.005 (c) (14))............................................................................. 8 15. Attachments............................................................................................................... 9 Attachment I Cement Summary ................................................................................................................. 9 CD5-99L I APD Page I of 15 Printed: 22-Jul-16 Applicatic Permit to Drill, Well CRU CD5-99L1 Saved: 22-Jul-16 Attachment 2 Drilling Hazards Summary............................................................ Attachment 3 Completion Schematic................................................................... Attachment 4 Directional Plan........................................................................... CD5-99L1 APD Page 2 of 15 Printed: 22-Jul-16 Applicatic Permit to Drill, Well CRU CD5-99L1 Saved: 22-Jul-16 1. Well Name (Requirements of 20 AAC 25.005 ()9) The well for which this application is submitted will be designated as CRU CD5-99L1. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) Location at Surface 287' FNL, 2421' FEL, Sec. 18, T11N, ME, UM NAD 1927 RKB Elevation 70.2' AMSL Northings: 5,965,921 Eastings: 349,559 Pad Elevation 33.9' AMSL Top of Productive Horizon (Heel) 2165' FNL, 1283' FEL, Sec. 21, T1IN, R4E, UM NAD 1927 Northings: 5,958,540 Eastings: 361,138 Measured Depth, RKB: 16,586' Total Vertical Depth, RKB: 7,468' Total Vertical Depth, SS: 7,398' Total Depth (Toe) 794' FNL, 1683' FEL, Sec. 34, T11N, R4E, UM NAD 1927 Northings: 5,949,263 Eastings: 365,867 Measured Depth, RKB: 27,000' Total Vertical Depth, RKB: 7,576' Total Vertical De th, SS: 7,506' Requirements of 20 AAC 25.050(b) Please see Attachment 4: Directional Plan The Applicant is the only affected owner. 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005(c)(3)) Please reference BOP and diverter schematics on file for Doyon 19. CD5-99L1 APD Page 3 of 15 Printed. 22-Jul-16 Applicatic Permit to Drill, Well CRU CD5-991-1 Saved: 22-Jul-16 4. Drilling Hazards Information (Requirements of20AAC 25.005 (c)(4)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Casing Size in Csg Setting Depth MD/TVD ft Fracture Gradient(psi) Pore pressure ASP Drilling (psi) 20 116 / 116 10.9 52 54 10.75 2,351 / 2,185 14.5 977 1,429 7.625 17,290 / 7,602 12.5 3,714 2,945 4.5 27,000 / 7,576 12.5 3,703 n/a PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052) - 0.1]*D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb/gal 0.052 = Conversion from lb./gal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP = FPP - (0.1 x D) Where: FPP = Formation Pore Pressure at the next casing point FPP = 0.4525 x TVD 1. ASP CALCULATIONS Drilling below 20" conductor ASP = [(FG x 0.052) - 0.1 ] D _ [(10.9 x 0.052) - 0.1] x 116 = 54 psi OR ASP = FPP-(0.1 x D) = 977 - (0.1 x 2185') = 759 psi Drilling below 10-3/4" surface casing ASP = [(FG x 0.052) - 0.1] D _ [(14.5 x 0.052) - 0.1] x 2185' = 1429 psi OR ASP = FPP - (0.1 x D) = 3714 - (0.1 x 7602') = 2954 psi Drilling below 7-5/8" intermediate casing ASP = [(FG x 0.052) - 0.1] D _ [(12.5 x 0.052) - 0.1] x 7576 = 4167 psi OR ASP = FPP - (0.1 x D) = 3703- (0.1 x 7576') = 2945 psi CD5-99L 1 APD Page 4 of 15 Printed: 22-Jul-16 Applicatic Permit to Drill, Well CRU CD5-991-1 Saved: 22-Jul-16 (B) data on potential gas zones; The well bore is not expected to penetrate any gas zones. (C) data concerning potential causes of hole problems such as abnormally geo pressured strata, lost circulation zones, and zones that have a propensity for differential sticking; Please see Attachment 2 - Drilling Hazards Summary �. Procedure for Conducting Formation Integrity Tests (Requirements of20AAC25.005 (c)(5)) Drill out surface casing shoe and perform LOT test or FIT in accordance with the Alpine LOT / FIT procedure that ConocoPhillips Alaska has on file with the Commission. 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) Casing and Cementing Program Csg/Tbg Hole Weight Grade Conn. Length Top MDITVD Btm MD/7-VD Cement Program OD (in) �i) (Iblft) (ft) (ft) (ft) 20 42 94 H-40 Welded 80 36 /36 116 / 116 Previously Installed HYD Cement to Surface with 10-3/4 13.5 45.5 L-80 563 X 2,351 36 /36 2,351/ 2,185 354 bbl DeepCrete Lead 11.0 ppg, BTCM 56.3 bbl Class G Tail Slurry 15.8 ppg 7-5/8 9 29.7 L-80 63 X 17,290 36 /36 17,290 / 7,602 168 bbl Class G at 15.8 ppg 11 BTCM 4-1/2 6.75 12.6 L-80 TXP 10,414 16,586 / 7,468 27,000 / 7,576 N/A — uncemented liner with pert pups 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) This PTD refers only to the CD5-99L1 production lateral, where the BOPE will be rigged up. The CD5-99 PTD details surface section and request for waiver of the diverter requirement under 20 AAC 25.035 (h) (2). CD5-99L1 APD Page 5 of 15 Printed. 22-Jul-16 Applicatic Permit to Drill, Well CRU CD5-99L1 Saved: 22-Jul-16 8. Drilling Fluid Program (Requirements of20AAC25.005(c)(8)) Production Hole Size in. 6.75 Casing Size in. 4.5 Density PPG 9.5 PV cP 15-22 YP Ib./100 ftz 10 - 15 Initial Gels Ib./100 ftz 9-12 10 Minute Gels Ib./100 ftz 12-18 API Fluid Loss cc/30 min. <10 HPHT Fluid Loss cc/30 min. <5 PH N/A Production Hole: The horizontal production interval will be drilled with an oil based mud drill -in fluid (Versapro) weighted to 9.5 ppg utilizing a 80:20 Oil Water Ratio and calcium carbonate. LVT-200 will be used as the base oil and CaC12 brine, 3 3 % by weight for the water phase. Diagram of Doyon 19 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. CD5-99L1 APD Page 6 of 15 Printed: 22-Jul-16 Applicatic Permit to Drill, Well CRU CD5-991_1 Saved: 22-Jul-16 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005 (c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005 (c)(11)) N/A - Application is not for an offshore well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005 (c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005 (c)(13)) The proposed drilling program is listed below. Please refer to Attachment 3: Completion Schematic. 1. End PTD for CD5-99 and begin PTD for CD5-99L 1. 2. Pick up and run in hole with 6-3/4" drilling BHA. 3. Drill 6-3/4" hole to section TD (LWD Program: GR/RES) 4. Pull out of hole with drilling BHA. 5. RIH with 4.5" Alpine C sand lower completion (uncemented liner with perforated pups) 6. Release from liner (plop and drop) and POOH with running string, top of liner will be — 100' outside of the intermediate casing window. 7. RIH with 3.5" tubing with two Baker Premier production packer. a. A waiver is requested to set the Alpine A Sand production packer within 100' of the Alpine C sand window as per 20 AAC 25.283 (c). The prodution packer will be —50' below the Alpine C Sand window. 8. Space out and land hanger. 9. Install BPV and pressure test hanger seals to 5000 psi. Nipple down BOP. 10. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove BPV. 11. Test tubing and tubing -casing annulus separately to 3500 psi / 30 mins. Chart test. 12. Shear circulation valve in GLM. 13. Circulate tubing to diesel and install freeze protection in the annulus. 14. Set BPV and secure well. RDMO. CD5-99L1 APD Page 7 of 15 Printed: 22-Jul-16 Applicatic Permit to Drill, Well CRU CD5-991_1 Saved: 22-Jul-16 14. Discussion of Mud and Cuttings Disposal and Annular Disposal (Requirements of 20 AAC 25.005 (c)(14)) Incidental fluids developed from drilling operations on well CD5-99L1 will be injected into a permitted surface casing x production casing annulus on CD5. The CD5-99 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000' TVD. Significant hydrocarbon zones include only the Alpine and Kuparuk sand based on pre -drill interpretations. There will be 500' of cement fill placed above the top of the Kuparuk reservoir. Once CD5-99 and CD5-99L1 has been drilled and completed, consideration may be given to permit this well for annular injection. An application for Sundry Operations form 10-403 will then be filed. Annular pumping of fluids occurring due to drilling operations, per regulation 20 AAC 25.080 could then begin once properly permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the base of the Schrader Bluff Formation (C-40). These 450-500' thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi _ (12.0 ppg) * (0.052) * (2,185') + 1,500 psi = 2863 psi Pore Pressure = 977 psi Therefore Differential = 2863 — 977 = 1886 psi. The internal casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: OD Wt Grade Range Connection Collapse 85% of Burst 85% of (ppf) Type Collapse Burst 10-3/4" 45.5 L-80 3 HYD563/BTCM 2470 psi 2100 psi 5210 psi 4429 psi 7-5/8" 29.7 L-80 3 HYD563/BTCM 4790 psi 4071 psi 6890 psi 5856 psi CD5-99L1 APD Page 8 of 15 Printed: 22-Jul-16 Applicatic Permit to Drill, Well CRU CD5-991-1 Saved: 22-Jul-16 15. Attachments Attachment 1 Cement Summary Attachment 2 Drilling Hazards Summary Attachment 3 Completion Schematic Attachment 4 Directional Plan CD5-99L1 APD Page 9 of 15 Printed: 22-Jul-16 Applicatic Permit to Drill, Well CRU CD5-99L1 Saved: 22-Jul-16 Attachment 1 — Cement Summary CD5-99L1 Cementing Program: CD5-99L1 wp11 Schematic 20" 94# H-40 Welded Conductor to 11.6 10-3/4" 45.5# L-80 HYD563/BTCM 2,35T MD / 2,185' TVD @ 45° inc. ........ ...... ..I ............. .....I......... 9-7/8" x 11" Hole Top of Cement . 15,342'. MD. / 7,.140' .TVD Kuparuk C 15,842' MD / 7,315' TVD KOP at top of Alpine C Alpine C 16,586'..MID / 7,468' TVD .. _.. 16,586,' MD / 7,468' TVD 7-5/8" 29.7 L-80 HYD563 X BTCM Alpine� 17,206' MD/ 7, 94' TVD �� \\` 17,290' MD Casing TVD @ 86° CD5-99 A Sand 6-3/4" Hole i CD5-9911-1 C Sand 6-3/4" Hole 27,000' MD / 7,678 @ 90' _ _ _ _ _ _i 27,000' MD / 7,576 @ 89- CD5-99L 1 APD Page 10 of 15 Printed: 22-Jul-16 Applicatio Permit to Drill, Well CRU CD5-99L1 Saved: 22-Jul-16 10.75" Surface Casing run to 2,351' MD / 2,185' TVD Cement from 2351 ' MD to 1851' (500' of tail) with Class G + Adds. @ 15.8 PPG, and from 1851' to surface with 11.0 ppg DeepCrete. Assume 250% excess annular volume in permafrost and 50% excess below the permafrost (1335' MD), zero excess in 20" conductor. Lead slurry from 1,851' MD to surface with Arctic Lite Crete @ 11.0 ppg Conductor (116' — 36� X 1.3645 ft3/ft X 1.0 (0% excess) = 109 ft3 Permafrost to Conductor (1,335' — 116� X 0.3637 ft3/ft X 3.5 (250% excess) = 1,552 ft3 Top of Tail to Permafrost (1,851'— 1,335) X 0.3637 ft3/ft X 1.5 (50% excess) = 282 ft3 Total Volume = 109 + 1,552 + 282 = 1,943 ft3 => 1007 sx of 11.0 ppg DeepCrete @ 1.93 ft3 /sk Tail slurry from 2,351' MD to 1,851' MD with 15.8 ppg Class G + additives Shoe to Top of Tail (2,351'—1,851� X 0.3637 ft3/ft X 1.50 (50% excess) = 273 ft3 Shoe Joint (80� X 0.5400 ft3/ft X 1.0 (0% excess) = 43 ft3 Total Volume = 273 + 43 = 316 ft3 => 271 sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% S002 accelerator @ 1.17 ft3/sk 7.625" Intermediate Casing run to 17,290' MD / 7,602' TVD Top of slurry is designed to be at 15,342' MD, which is 500' above the Kuparuk C. Assume 40% excess annular volume. * I I " Under reamer is 120' above the 9-7/8" bit. Tail slurry from 17,284' MD to 15,331' MD with 15.8 ppg Class G + additives Shoe to top of 9-7/8" Hole (17,290' — 17,170� X 0.2148 ft3/ft X 1.40 (40% excess) = 36 ft3 11" Hole to Top of Cement (17,170' — 15,342� X 0.3428 ft3/ft X 1.40 (40% excess) = 880 ft3 Shoe Joint (80') X 0.2578 ft3/ft X 1.0 (0% excess) = 21 ft3 Total Volume = 36+ 880 + 21 = 937 ft3 => 800 sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% S002 accelerator @ 1.17 ft3/sk CD5-99L1 APD Page 11 of 15 Printed: 22-Jul-16 Applicatio Permit to Drill, Well CRU CD5-99L1 Saved: 22-Jul-16 Attachment 2 — Drilling Hazards Summary (To be posted in Rig Floor Doghouse Prior to Spud) 6-3/4" Open Hole Production Interval Event Risk Level I Mitigation Strategy Lost circulation Low Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, mud rheology, lost circulation material Hole swabbing on trips Low Annular pressure applied by managed pressure drilling equipment. Abnormal Reservoir Pressure Low Well control drills, increased mud weight. Hydrogen Sulfide gas Low 1-12S drills, detection systems, alarms, standard well control practices, mud scavengers CD5-99L1 APD Page 12 of 15 Printed: 22-Jul-16 Applicatio Permit to Drill, Well CRU CD5-99L1 Saved: 22-Jul-16 Well Proximity Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in the following attachments. Drilling Area Risks: Reservoir Pressure: Offset injection has the potential to increase reservoir pressure over predicted. Although this is unlikely, the rig will be prepared to weight up if required. MPD could also be utilized in order to control reservoir. CD5-99L1 APD Page 13 of 15 Printed: 22-Jul-16 Applicatioi Permit to Drill, Well CRU CD5-991-1 Saved: 22-Jul-16 Attachment 3 — Completion Schematic CD5 - 99 Alpine A/C Dual Lateral Producer Proposed Schematic 20" 94# H-40 Welded Upper Completion: Conductorto 116' MD 1) 3-%z" 9.3#/ft eue8rd 2) Shallow nipple profile 2.812" 1 D 3) 3-'/z" x V Camco KBMG GLM (xx°) w/DCK2 pinned for 2500 psi casing to thg shear 4) Baker Premier Packer 5) CMU sliding sleeve 6) DB nipple 2.75" ID Lower Completion: 10-3/4" 45.5# L-80 HYD 563 x 7) Plop and drop liner in C sand BTC - no junction Surface Casing at 2,351' MD -4.5' 12.6# L-80 w/ perf pups 8) ZXP liner top packer & Flexlock Liner Hanger XO 9' Hydril 521 Box X 4-%" IBTM pin -4.5" 12.6# L-80 w/ Frac Ports 3-1/2" 9.3# L-80 eue8rd 7 5/8" 29.7# L-80 Hyd 563 x BTC C sand Lateral Intermediate Casing at 17,290' MD 6 3/4" Hole TD 16, 586' - 27, 000' M D -- - - - - -- - - - - - - - - - I i 4=/2" 12.6# L-80 TXP Liner wl perf pups � 0 0 0 0 0 0 0 0 0 0 0 o I i ------------------------------------------- Production Packer at 16, 500' MD - -- - 4--%" 12.6# L-80 TXP Liner w/ frac ports I CMU Sliding sleeve for P 1 Selectivity o 0 0 0 0 0 0 0 0 0 0 • a`---------- 3-1/2" 9.3#TN110SS _ -----------1 Production Packer at V A sand Lateral 6 3/4" Hole TD 16,636' MD ZXP liner top packer (whipstock 17,290' - 27,000' MD base) at 16,686' MD CD5-99L 1 APD Page 14 of 15 Printed: 22-Jul-16 CD5-99L1wp11 (5D) m Permit Pack Alpine C 0 0 0 17500 20000 22500 25000 27500 7-5/8" X 9-718" by 11" Measured Depth 0 � Depth Reference: Plan: 33.9+36.3 @ 70.20usft (Doyon 19) r Rig: Doyon 19 0 0 0 v o 0 0 v7 I N N N In 16800 17600 18400 19200 20000 20800 21600 22400 23200 24000 Horizontal Departure 18000 19500 21000 22500 24000 SURVEY PROGRAM epth From Depth To Survey/Plan Tool 36.30 350.00 CD5-99wp11 (5D) (Plan: CD5-99) GYD-GC-SS 350.00 750.00 CD5-99wp11 (5D) (Plan: CD5-99) GYD-GC-SS 750.00 2351.14 CD5-99wp11 (5D) (Plan: CD5-99) MWD+IFR-AK-CAZSC 2351.14 16586.26 CD5-99wp11 (5D) (Plan: CD5-99) MWD+IFR-AK-CAZ-SC 16586.26 16936.26 CD5-99L1wp11 (5D) (Plan: CD5-99L1) INC+TREND 16936.26 18436.26 CD5-99L1wp11 (5D) (Plan: CD5-991_1) MWD 16936.26 27000.00 CD5-99L1wp11 (5D) (Plan: CD5-99LlMWD+IFR-AK-CAZ-SC 25500 27000 Pad Elevation: 33.90 CASING DETAILS TVD MD 7468.20 16586.27 7-5/8" X 7575.76 27000.00 4-1 SECTION DETAILS Sec MD Inc Azi TVD +N/-S +E/-W Deg TFace VSect Target 1 16586.26 82.50 151.78 7468.20-71,17.34 11726.13 0.00 0.0011815.81 2 16599.06 84.26 152.80 7469.68-7158.59 11732.04 15.90 30.0011828.52 3 16629.06 84.26 152.80 7472.67-7185.14 11745.69 0.00 0.0011858.37 4 16777.24 89.45 152.80 7480.80-7316.70 11813.29 3.50 0.0012006.26 5 16810.22 89,47 151.81 7481.11-7345.89 11828.61 3.00-88.9712039.23 6 24248.47 89.47 151.81 7550.20-13901.80 15341.87 0.00 0.0019477.13 CD5-99L1 02.Toe 041916 JD 7 27000.00 89.47 151.81 7575.76-16326.93 16641.48 0.00 0.00 22228.53 DDII I plan Summary 7 Name Extended TD to Inclination at 379K8e 4026.2 �27000'MD. sidetrack point •e, R required decreased from K2 / Qannik Updated formation 83.5° to 82.5° 5068.2 Fails AC against tops. Increased dogleg Albian 97 parent lateral. TCR slightly to land 5949.2 requried. Added fault horizontal from 3 to Albian 96 location annotation. 3.5 70,2C1N.t�F 73abik /eligiluveach 74 By signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured it's completeness, and all surrounding wells are assigned to the proper position and I approve the scan and �rlrpn­ olan as set out n the nud I nnnk I nocroup it ­ thp hasis for th final well plan and wgll� drewin­ I nl;n nnknowlackre that unle-qs notified ot4arwi_�p all tarriet4ave . J., t. later Prepared by: Checked by: Accepted by: Approved by: I Brij Potnis Nate Beck 2rik Sterk Lee, Doherty � 1 1 1 G!. .� -� f •i .. � L n' i •. r. • - .__l�c--�'�� ..tip► � - i w `�' ��./t�� • � i� —=•.vim- �!'-!� v��I� 7i r U N N p M p U p / N U- / p U N p U N U p pM 09 U p o U + m N O pN p 07 U p U (ui[4sn 0009) Bu!4PoN N U oU p� U � v � _ � m �U O M m r a .a p U rn VU p `fir p n, CD o rn o rs a Lo p � p U U U rn � N f4 m M M W cM � U M p U J m 'n � M M LO p n U U-� o 3 m a X � X v M M p Q U Q 3 M n. m d 3 � M M I?Lo L p p U U � Gi 0 r 0 0 O No QQ 00 w C)) � y U o o o O T SJ N M l !� p x _ N o o 77 �° , CD 000 O r v r J - r Q' o + ++ Gs 0009 >. I ` I u o m rn w o o o ' a = 00Q x S 00 o .3 r- 0 o 0 � oo°> Lo w O V Q o !� CD 000 co O V 0 J o a � c x LO .� N M � x - o r 0 o 1 � o 0 0 0 0 0 0 0 0 0 o 0 M 0 0 Cfl O) 0 N 0 LO (+)u:PaN/(-)ulnoS `- r (]S) ��d^^��66-Sa� o0 000 N - N M 0009Z o x o ■� - o N 0009Z O ■� ♦� O 000tz LO O� i*cz O O o O O O O LO 00066 _ m CD O U 006Lz O Un 5 0000%% 000;0'lz O In 0006 O U 000134 LO (Y) oo6L,[ � n r o LO ` - 04 9L I' 00 N 0 0 0 ° O o o LO o L? LO o N co U*) rl- (D 00 ~ yjdaa leogjan anal ConocoPhillips(Alaska) Inc. -WNS Western North Slope C135 Alpine West Pad Plan: CD5-99 (513, formerly 13) Plan: CD5-99L1 Plan: CD5-99L1wp11 (513) Standard Proposal Report 22 July, 2016 Database: EDM Production Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Plan: CD5-99 (5D, formerly 13) Welibore: Plan: CD5-991-1 Design: CD5-99L1wp11 (5D) Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: SLB Standard Proposal Report Well Plan: CD5-99 (5D, formerly 13) Plan: 33.9+36.3 @ 70.20usft (Doyon 19) Plan: 33.9+36.3 @ 70.20usft (Doyon 19) True Minimum Curvature Project Western North Slope, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site CD5 Alpine West Pad Site Position: From: Map Position Uncertainty: 0.00 usft Slot Radius: 13-3/16" Well Plan: CD5-99 (5D, formerly 13) Well Position +N/-S 0.00 usft +E/-W 0.00 usft i Position Uncertainty 0.00 usft Ground Level: 33.90 usft - - �Wellbore Plan: CD5-99L1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength BGGM2016 8/25/2016 17.58 80.82 57,511 Design CD5-99L1wp11 (5D) Audit Notes: Version: Phase: PLAN Tie On Depth: 16,586.26 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 36.30 0.00 0.00 152.00 Plan Sections Measured Vertical TVD Dogleg Build Turn Depth Inclination Azimuth Depth System +N/-S +E/-W Rate Rate Rate Tool Face (usft) V) (°) (usft) usft (usft) (usft) (°/100usft) (°1100usft) (°/100usft) (°) 16,586.26 82.50 151.78 7,468.20 7,398.00 -7,147.34 11,726.13 0.00 0.00 0.00 0.00 16,599.06 84.26 152.80 7,469.68 7,399.48 -7,158.59 11,732.04 15.90 13.78 7.99 30.00 16,629.06 84.26 152.80 7,472.67 7,402.47 -7,185.14 11,745.69 0.00 0.00 0.00 0.00 16,777.24 89.45 152.80 7,480.80 7,410.60 -7,316.70 11,813.29 3.50 3.50 0.00 0.00 16,810.22 89.47 151.81 7,481.11 7,410.91 -7,345.89 11,828.61 3.00 0.05 -3.00 -88.97 24,248.47 89.47 151.81 7,550.20 7,480.00 -13,901.80 15,341.87 0.00 0.00 0.00 0.00 27,000.00 89.47 151.81 7,575.76 7,505.56 -16,326.93 16,641.48 0.00 0.00 0.00 0.00 712212016 9:26:51AM Page 2 COMPASS 5000.1 Build 74 Database: EDM Production Local Co-ordinate Reference: Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Project: Western North Slope MD Reference: Site: CDs Alpine West Pad North Reference: Well: Plan: CD5-99 (5D, formerly 13) Survey Calculation Method: Wellbore: Plan: CD5-991-1 Design: CD5-99L1wp11 (5D) SLB Standard Proposal Report Well Plan: CD5-99 (5D, formerly 13) Plan: 33.9+36.3 @ 70.20usft (Doyon 19) Plan: 33.9+36.3 @ 70.20usft (Doyon 19) True Minimum Curvature Planned Survey Measured Vertical Depth Inclination Azimuth Depth TVDss +N/-S +E/-W DLS Vert Section (usft) (') (usft) usft (usft) (usft) 7,398.00 16,58626 82.50 151.78 7,468.20 7,39800 -7,147.34 11,726.13 1.26 11,815.81 KOP: 15.9'/100' DLS, 30' TF, for 12.8' - Alpine C 16,586.27 82.50 151.78 7,468.20 7,398.00 -7,147.35 11,726.14 0,00 11,815.82 7-6/8" X 9-7/8" by 11" 16,599.06 84.26 152.80 7,469.68 7,399.48 -7,158.59 11,732.04 15.91 11,828.52 Hold for 30' 16,600.00 84.26 152.80 7,469.77 7.399.57 -7,159.42 11,732.47 0.00 11,829.46 16,629.06 84.26 152.80 7,472.67 7,402.47 -7,185.14 11,745.69 0.00 11,858.37 Start 3.5.1100' DLS, 0' TF, for 148.18' 16,700.00 86.75 152.80 7,478.23 7,408.03 -7,248.04 11,778.01 3.50 11,929.08 16,718.97 87.41 152.80 7.479.20 7,409.00 -7,264.89 11,786.67 3.50 11,948.02 UJU 16,777.24 89.45 152.80 7,480.80 7,410.60 -7,316.70 11,813.29 3.50 12,006.26 Start 3'/100' DLS,-88.97' TF, for 32.97' 16,800.00 89.46 152.12 7,481.01 7,410.81 -7,336.88 11,823.81 3.00 12,029.02 16,810.22 89.47 151.81 7,481.11 7.410.91 -7,345.89 11,828.61 3.00 12,039.23 Hold for 7438.26' 16,900.00 89.47 151.81 7,481.94 7,411.74 -7,425.03 11,871.02 0.00 12,129.02 17,000.00 89.47 151.81 7,482.87 7,412.67 -7,513.16 11,918.25 0.00 12,229.01 17,100.00 89.47 151.81 7,483.80 7,413.60 -7,601.30 11,965.48 0.00 12,329.01 17,200.00 89.47 151.81 7,484.73 7,414.53 -7,689.44 12,012.72 000 12,429.00 17,300.00 89.47 151.81 7,485.66 7,415.46 -7.777.58 12,059.95 0.00 12,529.00 17,400.00 89.47 151.81 7,486.59 7,416.39 -7,865.71 12,107.18 0.00 12,628.99 17,500.00 89.47 151.81 7,487.52 7,417.32 -7,953.85 12,154.41 0.00 12,728.99 17,600.00 89.47 151.81 7,488.44 7,418.24 -8,041.99 12,201.65 0.00 12,828.98 17,700.00 89.47 151.81 7,489.37 7,419.17 -8,130.13 12,248.88 0.00 12,928.98 17,800.00 89.47 151.81 7,490.30 7,420.10 -8,218.27 12,296.11 0.00 13,028.97 17,900.00 89.47 151.81 7,491.23 7,421.03 -8,306.40 12,343.34 0.00 13,128.97 18,000.00 89.47 151.81 7,492.16 7,421.96 -8,394.54 12,390.57 0.00 13,228.96 18,100.00 89.47 151.81 7,493.09 7,422.89 -8,482.68 12,437.81 0.00 13,328.96 18,200.00 89.47 151.81 7,494.02 7,423.82 -8,570.82 12,485.04 0.00 13,428.95 18,300.00 89.47 151.81 7,494.95 7,424.75 -8,658.95 12,532.27 0.00 13,528.95 18,400.00 89.47 151.81 7,495.87 7,425.67 -8.747.09 12,579.50 0.00 13,628.94 18,500.00 89.47 151,81 7,496.80 7,426.60 -8.835.23 12,626.74 0.00 13,728.94 18,600.00 89.47 151.81 7,497.73 7,427.53 -8,923.37 12,673.97 0.00 13,828.93 18,700.00 89.47 151.81 7,498.66 7,428.46 -9,011.50 12,721.20 0.00 13,928.93 18,800.00 89.47 151.81 7.499.59 7,429.39 -9,099.64 12,768.43 0.00 14,028.92 18,900.00 89.47 151.81 7,500.52 7.430.32 -9,187.78 12,815.67 0.00 14,128.92 19,000.00 89.47 151.81 7,501.45 7,431.25 -9,275.92 12,862.90 0.00 14,228.91 19,100.00 89.47 151.81 7,502.38 7,432.18 -9,364.06 12,910.13 0.00 14,328.91 19,200.00 89.47 151.81 7,503.31 7,433.11 -9,452.19 12,957.36 0.00 14,428.90 19,300.00 89.47 151.81 7,504.23 7,434.03 -9,540.33 13,004.59 0.00 14,528.90 19,400.00 89.47 151.81 7,505.16 7,434.96 -9,628.47 13,051.83 0.00 14,628.89 19,500.00 89.47 151.81 7,506.09 7,435.89 -9,716.61 13,099.06 0.00 14,728.89 19,600.00 89.47 151.81 7,507.02 7,436.82 -9,804.74 13,146.29 0.00 14,828.88 712212016 9:26:51AM Page 3 COMPASS 5000.1 Build 74 SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Plan: CD5-99 (5D, formerly 13) Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Plan: 33.9+36.3 @ 70.20usft (Doyon 19) Project: Western North Slope MD Reference: Plan: 33.9+36.3 @ 70.20usft (Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-99 (51D, formerly 13) Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-991-1 Design: CD5-99L1wp11 (51D) Planned Survey Measured Vertical Depth Inclination Azimuth Depth TVDss +NfS +EI-W DLS Vert Section (usft) (') (usft) usft (usft) (usftj 7,437.75 19,700.00 89A7 151.81 7,507.95 7,437.75 -9,892.88 13,193.52 0.00 14,928.88 19,800.00 89.47 151.81 7,508.88 7,438.68 -9,981.02 13,240.76 0.00 15,028.87 19,900.00 89.47 151.81 7,509.81 7,439.61 -10,069.16 13,287.99 0.00 15,128.87 20,000.00 89.47 151.81 7,510.74 7,440.54 -10,157.29 13,335.22 0.00 15,228.87 20,100.00 89.47 151.81 7,511.67 7,441.47 -10,245.43 13,382.45 0.00 15,328.86 20,200.00 89.47 151.81 7,512.59 7,442.39 -10,333.57 13,429.69 0.00 15,428.86 20,300.00 89.47 151.81 7,513.52 7,443.32 -10,421.71 13,476.92 0.00 15,528.85 20,400.00 89.47 151.81 7,514.45 7,444.25 -10,509.84 13,524.15 0.00 15,628.85 20,500.00 89.47 151.81 7,515.38 7,445.18 -10,597.98 13,571.38 0.00 15,728.84 20,600.00 89.47 151.81 7,516.31 7,446.11 -10,686.12 13.618.61 0.00 15,828.84 20,700.00 89.47 151.81 7,517.24 7,447.04 -10.774.26 13,665.85 0.00 15,928.83 20,800.00 89.47 151.81 7,518.17 7,447.97 -10,862.40 13,713.08 0.00 16,028.83 20,900.00 89.47 151.81 7,519.10 7,448.90 -10,950.53 13,760.31 0.00 16,128.82 21,000.00 89.47 151.81 7,520.03 7,449.83 -11,038.67 13,807.54 0.00 16,228.82 21,100.00 89.47 151.81 7,520.95 7,450.75 -11,126.81 13,854.78 0.00 16,328.81 21,200.00 89.47 151.81 7,521.88 7,451.68 -11.214.95 13,902.01 0.00 16,428.81 21,300.00 89.47 151.81 7,522.81 7,452.61 -11,303.08 13,949.24 0.00 16,528.80 21,400.00 89.47 151.81 7,523.74 7,453.54 -11,391.22 13,996.47 0.00 16,628.80 21,500.00 89.47 151.81 7,524.67 7,454.47 -11,479.36 14,043.71 0.00 16,728.79 21,600.00 89.47 151.81 7,525.60 7,455.40 -11,567.50 14,090.94 0.00 16,828.79 21,700.00 89.47 151.81 7,526.53 7,456.33 -11,655.63 14,138.17 0.00 16,928.78 21,800.00 89.47 151.81 7,527.46 7,457.26 -11,743.77 14,185.40 0.00 17,028.78 21,900.00 89.47 151.81 7,528.39 7,458.19 -11,831.91 14,232.63 0.00 17.128.77 22,000,00 89.47 151.81 7,529.31 7,459.11 -11,920.05 14,279.87 0.00 17,228.77 FAULT crossing; 35' downthrown at 22,000' MD 22,100.00 89.47 151.81 7,530.24 7,460.04 -12,008.18 14,327.10 0.00 17,328.76 22,200.00 89.47 151.81 7,531.17 7,460.97 -12,096.32 14,374.33 0.00 17,428.76 22,300.00 89.47 151.81 7,532.10 7,461.90 -12,184.46 14,421.56 0.00 17,528.75 22,400.00 89.47 151.81 7,533.03 7,462.83 -12,272.60 14,468.80 0.00 17,628.75 22,500.00 89.47 151.81 7,533.96 7,463.76 -12,360.74 14,516.03 0.00 17,728.74 22,600.00 89.47 151.81 7,534.89 7,464.69 -12,448.87 14,563.26 0.00 17,828.74 22,700.00 89.47 151.81 7,535.82 7,465.62 -12,537.01 14,610.49 0.00 17,928.73 22,800.00 89.47 151.81 7,536.75 7,466.55 -12,625.15 14,657.73 0.00 18,028.73 22,900.00 89.47 151.81 7,537.67 7,467.47 -12,713.29 14,704.96 0.00 18,128.72 23,000.00 89.47 151.81 7,538.60 7,468.40 -12,801.42 14,752.19 0.00 18,228.72 23,100.00 89.47 151.81 7,539.53 7,469.33 -12,889.56 14,799.42 0.00 18,328.72 23,200.00 89.47 151.81 7,540.46 7,470.26 -12,977.70 14,846.65 0.00 18,428.71 23,300.00 89.47 151,81 7,541.39 7,471.19 -13,065.84 14,893.89 0.00 18,528.71 23,400.00 89.47 151.81 7,542.32 7,472.12 -13,153.97 14,941.12 0.00 18,628.70 23,500.00 89.47 151.81 7,543.25 7,473.05 -13,242.11 14,988.35 0.00 18,728.70 23,600.00 89.47 151.81 7,544.18 7,473.98 -13,330.25 15,035.58 0.00 18,828.69 23,700.00 89.47 151.81 7,545.11 7,474.91 -13,418.39 15,082.82 0.00 18,928.69 23,800.00 89.47 151.81 7,546.03 7,475.83 -13,506.53 15,130.05 0.00 19,028.68 23,900.00 89.47 151.81 7,546.96 7,476.76 -13,594.66 15,177.28 0.00 19.128.68 24,000.00 89.47 151.81 7,547.89 7,477.69 -13,682.80 15,224.51 0.00 19,228.67 7/22/2016 9:26.51AM Page 4 COMPASS 5000.1 Build 74 Database: EDM Production Company: ConocoPhiIli ps(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Plan: CD5-99 (5D, formerly 13) Wellbore: Plan: CD5-99L1 Design: CD5-99L1wpll (5D) Planned Survey Measured Vertical Depth Inclination Azimuth Depth (usft) 0 0 (usft) 24,100.00 89.47 151.81 7,548.82 24,200.00 89.47 151.81 7,549.75 24,248.47 89.47 151.81 7,550.20 Adjust TF to 0°, for 2761.63' 24,300.00 89.47 151.81 7,550.68 24,400.00 89.47 151.81 7,551.61 24,500.00 89.47 151.81 7,552.54 24,600.00 89.47 151.81 7,553.47 24,700.00 89.47 151.81 7,554.39 24,800.00 89.47 151.81 7,555.32 24,900.00 89A7 151.81 7,556.25 25,000.00 89.47 151.81 7,557.18 25,100.00 89.47 151.81 7,558.11 25,200.00 89.47 151.81 7,559.04 25,300.00 89.47 151.81 7,559.97 25,400.00 89.47 151.81 7,560.90 25,500.00 89.47 151.81 7,561.83 25,600.00 89.47 151.81 7,562.75 25,700.00 89.47 151.81 7,563.68 25,800.00 89.47 151.81 7,564.61 25,900.00 89.47 151.81 7,565.54 26,000.00 89.47 151.81 7,566.47 26,100.00 89.47 151.81 7,567.40 26,200.00 89.47 151.81 7,568.33 26,300.00 89.47 151.81 7,569.26 26,400.00 89.47 151.81 7,570.19 26,500.00 89.47 151.81 7.571.11 26,600.00 89.47 151.81 7,572.04 26,700.00 89.47 151.81 7,572.97 26,800.00 89.47 151.81 7,573.90 26,900.00 89.47 151.81 7,574.83 27,000.00 89.47 151.81 7,575.76 TD: 27000' MD, 7676.76' TVD-4-1/2" x 6314" Targets Target Name hit/miss target Shape CD5-99L1 03. Toe 072116 JD plan hits target center Circle (radius 100.00) CD5-991_1 02.Toe 041916 JD plan hits target center Circle (radius 100.00) Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: SLB Standard Proposal Report Well Plan: CD5-99 (5D, formerly 13) Plan: 33.9+36.3 @ 70.20usft (Doyon 19) Plan: 33.9+36.3 @ 70.20usft (Doyon 19) True Minimum Curvature TVDss +Nl-S +El-W DLS Vert Section usft (usft) (usft) 7,478.62 7,478.62 -13,770.94 15,271.75 0.00 19,328.67 7,479.55 -13,859.08 15,318.98 0.00 19,428.66 7,480.00 -13,901.80 15,341.87 0.00 19,477.13 7,480.48 -13,947.21 15,366.21 0.00 19,528.66 7,481.41 -14.035.35 15,413.44 0.00 19,628.65 7,482.34 -14,123.49 15,460.67 0.00 19,728.65 7,483.27 -14,211.63 15,507.91 0.00 19,828.64 7,484.19 -14,299.76 15,555.14 0.00 19,928.64 7,485.12 -14,387.90 15,602.37 0.00 20,028.63 7,486.05 -14,476.04 15,649.60 0.00 20,128.63 7,486.98 -14,564.18 15,696.84 0.00 20,228.62 7,487.91 -14,652.31 15,744.07 0.00 20,328.62 7,488.84 -14,740.45 15,791.30 0.00 20,428.61 7,489.77 -14,828.59 15,838.53 0.00 20,528.61 7,490.70 -14,916.73 15,885.76 0.00 20,628.60 7,491.63 -15,004.87 15,933.00 0.00 20,728.60 7,492.55 -15,093.00 15,980.23 0.00 20,828.59 7,493.48 -15,181.14 16,027.46 0.00 20,928.59 7,494.41 -15,269.28 16,074.69 0.00 21,028.58 7,495.34 -15,357.42 16,121.93 0.00 21,128.58 7,496.27 -15,445.55 16,169.16 0.00 21,228.57 7,497.20 -15,533.69 16,216.39 0.00 21,328.57 7,498.13 -15,621.83 16,263.62 0.00 21,428.56 7,499.06 -15,709.97 16,310.86 0.00 21,528.56 7,499.99 -15,798.10 16,358.09 0.00 21,628.56 7,500.91 -15,886.24 16,405.32 0.00 21,728.55 7,501.84 -15,974.38 16,452.55 0.00 21,828.55 7,502.77 -16,062.52 16,499.78 0.00 21,928.54 7,503.70 -16,150.65 16,547.02 0.00 22,028.54 7,504.63 -16,238.79 16,594.25 0.00 22.128.53 7,505.56 -16,326.93 16,641.48 0.00 22,228.53 Dip Angle Dip Dir. TVD +N/-S +E/-W (1) (1) (usft) (usft) (usft) 0.00 0.00 7,575.76-16,326.93 16,641.48 0.00 0.00 7,550.20-13,901.80 15,341.87 712212016 9:26:51AM Page 5 COMPASS 5000.1 Build 74 SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Plan: CD5-99 (5D, formerly 13) Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Plan: 33.9+36.3 @ 70.20usft (Doyon 19) Project: Western North Slope MD Reference: Plan: 33.9+36.3 @ 70.20usft (Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-99 (5D, formerly 13) Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-991-1 Design: CD5-99L1wp11 (5D) 16,586.27 7,468.20 7-5/8" X 9-7/8" by 11" 7-5/8 11 27,000.00 7,575.76 4-1/2" x 6-3/4" 4-1/2 6-3/4 Formations Measured Vertical Vertical Dip Depth Depth Depth SS Dip Direction (usft) (usft) Name Lithology 9,736.68 5,068.20 Albian 97 15,484.65 7,200.20 Kalubik 12,110.95 5,949.20 Albian 96 15,842.35 7,315.20 LCU / Miluveach 1,335.01 1,320.20 Base Permafrost 16,586.26 7,468.20 Alpine C 3,786.19 2,860.20 C10 6,314.07 3,798.20 K3 16,718.97 7,479.20 UJU 6,928.52 4,026.20 K2 / Qannik 2,538.98 2,312.20 C30 14,999.95 7,021.20 HRZ Plan Annotations Measured Vertical Local Coordinates Depth Depth +NI-S +E/-W (usft) (usft) (usft) (usft) Comment 16,586.26 7,468.20 -7,147.34 11,726.13 KOP: 15.9°/100' DLS, 30° TF, for 12.8' 16,599.06 7,469.68 -7,158.59 11,732.04 Hold for30' 16,629.06 7,472.67 -7,185.14 11,745.69 Start 3.50/100' DLS, 0° TF, for 148.18' 16,777.24 7,480.80 -7,316.70 11,813.29 Start 3°/100' DLS,-88.97° TF, for 32.97' 16,810.22 7,481.11 -7,345.89 11,828.61 Hold for7438.26' 22,000.00 7,529.31 -11,920.05 14,279.87 FAULT crossing; 35' downthrown at 22,000' MD 24,248.47 7,550.20 -13,901.80 15,341.87 Adjust TF to 0°, for 2751.53' 27,000.00 7,575.76 -16,326.93 16,641.48 TD: 27000' MD, 7575.76' TVD 7/22/2016 9:26:51AM Page 6 COMPASS 5000.1 Build 74 ° 3 a Z m m E ,) o c U m c 01 C c ° � W c a CL 0 = o y W o x o m m �I i L N t E tj + y O m a Q W 0 :_ u N � E a o v CL _ U a N t W (D .a E r. p a o L J N d •— o p �� ��_� a s 0CL ,A ■— � W CL ,w _ i C) 0) Q a o M N M Q a p CD as rn 3 t� "�� o ;oo -a`N m p= Z c .Q w) tp L gyp�\\ Q Z � 0 N 4 J V N y o p LA ci ar V �U1)� W Q w�! w�!LO Q .J E C C 0 'L C C ° `°� N a m in an c7 > <n W 0 a ° L a w w w w w w w w w ° W tY d' K � d' D �' d' 2' Q' ♦f� • �y � •� . Z L Q m O. .0 .0 .0 .0 .0 (Q f0 N f6 (0 .0 (0 .° .0 .0 .° (0 (6 N N LCo N O .Q � c 0 = U w w w w w w w w w w U Q m w w w w m m m m w m w w w w N N N m (� N L � a_ a (L d 0- lL d d d IL) r o a O O L a a E `o o m 7 ° (D U U U U U U U U U U L C LL m LL m LL LL m LL m LL (p N y m y N N w (D N N U 0 U U U U ❑ U E N 19 c m c c 5 F N N N w N d) 0 U U U U U U U U U U U U U N N rn N Y Y Y � Qi Qi ❑ ai N O O O (D n � m O N n 7 V T O Q) � Ln � U% Z O a' � a' W O i N d' 7 M N .-- U U LL LL LL C7 U` + + + U U CD (D 2o 2 Z 2E a 0 0 0 0 0 o 0 0 0 0 0 o 0 0 0 0 O o 0 0 m vi o (n 0 In (n 0 0 0 0 O L w a N O N O N 7 V V N R N 0 (D O O w (D N (D w ° cD ro o v D v N � Ln N N p� V C n n V N M (MD Lq Lq O O w W V (D (O 0) (o 0) 0) (n N f� D) D) N n M r m 0 m 0 N r (D (n CL a N O n n (D Q m V W v 3 r- n n O n n N n O N (n a M (D (O N O) (f) O W V W In N M V O O f� C y O L S•' 00 a0 N O n (D N N (D Lr O In O (n Ln CO (n CO (n m 1 y a p wLf):C) N 0 N d G N N N N N N 3 •° m m E y 1 Oa - n M cD CD In w O W N C V n n O OD (n (n O N 7 N M M 00 (D N O (A V M O N M lD O) M D M 0 Ln u') co (° 0 (D tD (D (n O O CL v U On r O n n N n O N (() L Gl a M (n (D N D) V 00 (D N M D. d a O m m a m L v LO 0 a! v 0 0 � 3 3 3 W C a — y O. N (O N ON (D LO 1 00 Ln W (D J J J Gl W 0 ` m tD (D (D (D V (D 't Q1 O D1 Q NNN N LO ❑ ❑ ❑ v lY T — U U U L GI •a a E O ? w E 1 N O O O N N N O Ot L7 N ❑ ❑ O U T Cn N O (D (D Q D_ ❑ ❑ ~ N (D (D m h .0.. 0 a O N 7 w � 3 3� n rn s d °�) E ❑ ❑ ❑ ❑ d m j LL (n (n o 0 o v (D (D cD L m M O O s- N N N O U" U Z U U L (D O O (D (D (D C a w O O 2 d 0 m J J n r r d n- O E (�" M tD Ln u') OJ M M O w M r co N D) Dl aa0 L LL V N co (D CD L m d o —_ M M N (n (n (n (� O fq N 04 4 4M M M ❑❑❑❑ M" O ❑ ❑ V 1 1 UUUU ,, >, ' a N �-' y U U ❑ ❑ ❑ a C C C C N N 0 Q o E ❑ U U U E E a a a a x o (n n 2 U m co N d d N (+M M M O (DZ (D (D (D (D (/1 •_ E ❑ a � � � � y 0 O fC U U FLNO O (f) (n (n (A O(A N Q w E i w m Q t7 ❑ ❑ Z(mn m` O. N M M M U❑ U❑ U V Od m a,E v v LO o it U x mmmmm❑m0: U U U U U U U Q N U U F � L7 V1 4 0 U T 0 N ZT y Ladder View 15 26 July 21 2016 CD5-99L1 wp11 (5D) The Reference Well is along the X-axis. Error Ellipses are the Sum of the Reference and Offset Well Errors. 300 c o i m `m Q o D 150 -- -- — — - -- --- j o w U L 0 i Equivelant Magnetic Distance000 19500 21000 22500 24000 25500 27000 Displayed interval could be less than entire well:Measured Depth6586.26 To 27000.00 SURVEY PROGRAM CASING DETAILS Depth From Depth To Survey/Plan Tool TVD MD Name 36.30 350.00 CD5-99wp11 (5D) (Plan: CD5-99) GYD-GC-SS 7468.20 16586.27 7-5/8" X 9-7/8" by 11" 350.00 750.00 CD5-99wp11 (5D) (Plan: CD5-99) GYD-GC-SS 7575.76 27000.00 4-1/2" x 6-3/4" 750.00 2351.14 CD5-99wp11 (51)) (Plan: CD5-99) MWD+IFR-AK-CAZ-SC 2351.14 16586.26 CD5-99wp11 (5D) (Plan: CD5-99) MWD+IFR-AK-CAZ-SC 16586.26 16936.26 CD5-99L1wp11 (5D) (Plan: CD5-991-1) INC+TREND 16936.26 18436.26 CD5-99L1wp11 (5D) (Plan: CD5-991-1) MWD 16936.26 27000.00 CD5-99L1wp11 (5D) (Plan: CD5-991-1) MWD+IFR-AK-CAZ-SC 0 3 GJCRrequired Minor Risked NOT APPROVED 0 U 80 c 0 l m CL � m U m N30 U O U j Equivelant Magnatic Distance 0 17000 17500 18000 18500 19000 19500 20000 Partial Measured Depth COS-99L1wp11 (5D) MD Inc Azi TVD, Dleg TFace Targez 16586.26 82.50 151.78 7468.20 0.00 0.00 16586.26 To 27000.00 16599.06 84.26 152.80 7469.68 15.90 30.00 16629.06 84.26 152.80 7472.67 0.00 0.00 16777.24 16810.22 89.45 89.47 152.80 151.81 7480.80 7481.11 3.50 3.00 0.00 -88.97 15:27,JUly 21 2016 24248.47 27000.00 89.47 89.47 151.81 151.81 7550.20 7575.76 0.00 0.00 0.00 CD5-991-1 02.Toe 041916 JD 0.00 CASING DETAILS TVD MD Name 7468.20 16586.-/2-b/8" X 9-7/8" by 11" 7575.76 27000.00 4-1/2" x 6-3/4" suR�r PxOGRAn ptM1 Fran 1,11 Ta 1,- y1plan Toal ]6.]B J58.B0 CD5--1 1 (50) (Planan: : CD5-99 G'N-GC-55 5-(50) (PlCD5-991 GY[1-GC-55 ]50.00 3J51. C05-99up11 (SDI (Plan: CD5-991 lB.O�I FR-Ax-GZ-SC 2151 .121< 16586. 36 CD5-99w11 (501 (Plan: CD5.991 l C,TRE-AI(-CAZ-SC sown (s01 (P)an'. cos-sslm{c.TR6xD 1693fi.26 10d36.26 CD5-99L1 wp11 (s0) IPl- CD5-99 W 1693fi.2fi 2]BBB.BB CD5-99U1 11 (5D) P12n'. CD5-990Yp�I FR-Ax-GZ-SC 0 / 360 CD5 Minor NO7 -90 / 270 16586 16770 16770 16960 16960 17150 17150 17340 17340 17530 17530 17710 17710 """""." 17900 17900 18280 18280 18650 18650 19030 19030 19400 19400 """ 19780 19780 20150 20150 -- 20530 20530 "" J" 20900 20900 -- 21660 21660 22430 22430 23190 23190 23950 23950 --- 24710 24710 25470 25470 26240 26240 27000 Mo Northing (5000 usft/in) iR 4- W Mu 03 0 N 7 O O O b a c y W y4sn 0009) BUMPON AC Flipbook ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Plan: CD5-99 (513, formerly 13) Plan: C135-991-1 Plan: CD5-99L1wp11 (513) Error Ellipse Survey Report 22 July, 2016 SLB Error Ellipse Report Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Plan: CD5-99 (5D, formerly 13) Wellbore: Plan: CD5-99L1 Design: CD5-99L1wp11 (5D) Survey Tool Program Date 7/22/2016 From To (usft) (usft) Survey (Wellbore) 36.30 350.00 CD5-99wp11 (5D) (Plan: CD5-99) 350.00 750.00 CD5-99wp11 (5D) (Plan: CD5-99) 750.00 2,351.14 CD5-99wp11 (5D) (Plan: CD5-99) 2,351.14 16,586.26 CD5-99wp11 (5D) (Plan: CD5-99) 16,586.26 16,936.26 CD5-99L1wp11 (5D) (Plan: CD5-99L1) 16,936.26 18,436.26 CD5-99L1wp11 (5D) (Plan: CD5-99L1) 16,936.26 27,000.00 CD5-99L1wp11 (5D) (Plan: CD5-99L1) Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: CD5-99 (5D, formerly 13) Plan: 33.9+36.3 @ 70.20usft (Doyon 19) Plan: 33.9+36.3 @ 70.20usft (Doyon 19) True Minimum Curvature 1.00 sigma EDM Production Tool Name Description GYD-GC-SS Gyrodata gyro single shots GYD-GC-SS Gyrodata gyro single shots MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC INC+TREND Inclinometer + known azi trend MWD MWD - Standard MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Position uncertainty and bias at survey station Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semi -major Semi -minor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (Usm (°) (°) [usft) (um) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) I°I 16,586.26 82.50 151.78 7,468.20 23.67 -4.59 71.84 -7.54 22.88 6.32 16.15 83.22 10.05 121.21 MWD+IFR-AK-CAZ-SC (1, 4) 16,586.27 82.50 151.78 7,468.20 23.67 -4.59 71.84 -7.54 22.88 6.32 16.15 83.22 10.05 121.21 INC+TREND (1, 5) 16,599.06 84.26 152.80 7,469.68 23.41 -5.02 71.16 -7.77 22.87 6.32 16.16 83.33 10.09 121.19 INC-TREND (1, 5) 16,629.06 84.26 152.80 7,472.67 23.55 -5.02 72.57 -7.77 23.01 6.32 16A9 84.21 12.50 121.93 INC+TREND (1, 5) 16,718.97 87.41 152.80 7,479.20 47.87 -6.21 109.78 -7.77 47.85 6.33 16.33 113.61 33.60 137.18 INC+TREND (1, 5) 16,777.24 89.45 152.80 7,480.80 47.87 -6.21 109.78 -7.77 47.85 6.33 16.33 113.61 33.60 137.18 INC+TREND (1, 5) 16,810.22 89.47 151.81 7,481.11 51.06 -6.21 120.45 -7.54 51.04 6.33 16.35 122.98 35.61 139.67 INC+TREND (1, 5) 22,000.00 89.47 151.81 7,529.31 92.34 -6.21 186.84 -7.54 92.33 6.38 20.87 187.64 39.90 146.38 MWD+IFR-AK-CAZ-SC (2,6) 24,248.47 89.47 151.81 7,550.20 92.82 -6.21 190.88 -7.54 92.81 6.40 22.95 191.71 39.74 146.33 MWD+IFR-AK-CAZ-SC (2,6) 27,000.00 89.47 151.81 7,575.76 93.64 -6.21 196.88 -7.54 93.63 6.43 25.57 197.74 39.59 146.35 MWD+IFR-AK-CAZ-SC (2,6) 712212016 9 4224AM Page 2 COMPASS 5000.1 Build 74 Pool Report CD5-99wp11 Surface Location M CPAI Coordinate Converter From: Datum: NAD83 Region: alaska r LatitudelLongitude Decimal Degrees C' UTM Zone: F South re- State Plane Zone: 4 Units: us ft t" Legal Description (NAD27 only] Starting Coordinates: - - - j X: j 1489591.67 5965666.90 3 CD5-99wp11 Surface Location M CPAI Coordinate Converter From: Datum: NAD83-- Region: alaska Latitude/Longitude Decimal Degrees r UTM Zone: r South t: State Plane Zone: 4 - Units: us-ft (" Legal De;c:rip= i sr. ONAI)27 ony] Starting Coordinates: -- - ---- - -- X: 1489591.67 Y: 5965666.90 M - To: i Datum: NAD27 Region: alaska i Latitude/Longitude Decimal Degrees t� UTM Zone: True South `€ I t: State Plane Zone: 14 Units: us-ft Legal Description (NAD27 only) Ending Coordinates: I i X: 349558.527980958_._ i Y: 1 5965920.93081628 I Transform Quit Help -To:_—��__ Datum: NAD27 Region: jalaska Latitude/Longitude Decimal Degrees- UTM Zone: True r South i" State Plane Zone: 1'Units: us ft f. Legal Description (NAD27 only) Transform Township: 011 N Range: 004 E .. Meridian: U Section:l8 FNL 1287.03168 IFEL 12420.8262 Quit Help CD5-99wp11 Surface Casing I N CPAT Conrrfinate Converter C 1WK.-M) From: Datum: INAD83 I Region: jala;k, f— LatitudelLongitude Decimal Degrees r UTM Zone: f— f— South ro' State Plane Zone: 14 1 Units: jus.ft - Legal Description (NAD27 only) Starting Coordinates: X: 11490031.97 Y: 5965207.35 -------- -- To: Datum: INAD27 j Region: fa—la—,—k-a-----,—1 t— Latitude/Longitude DecimalDegrees r UTM Zone: f—True F South i fo State Plane Zone: Units: us ft Legal Description (NAD27 only) Ending Coordinates: X: I 34999515165508 Y: 15965461.36414617' .......... Transform Quit Help ................................................. . CD5-99wp11 Surface Casing I M CPAI Coordinate Converter rrom: Datum: IUD83 I Region: jalaska 'I r' Latitude/Longitude Decimal Degrees UTM Zone: F South r- State Plane Zone: F -:_1 Units: jus-ft Starting Coordinates: X: 1490031.97 Y: 155E5207.35 To: Datum: Region: INAD27 71 lalaska Latitude/Longitude jDecimal Degrees UTM Zone: [T True F South f— State Plane Zone: 4 Units: Iu;T r-- Legal Description (NAD27 only) Township: [0-11 N Range: f-004 f EF�,] Meridian: Section: fj —8 1737.75426 FE 11973.1146 ................ Transform Quit Help .............................................. jCD5-99LIwp11 Kick-off Point CPAI Coordinate Converter � Datum: }NADg3 °1 R�o�n ��� ' -- ' --- / r LatitudeiLongitude |DexirnuDeoreeo StatePlane Zone: Units: (- Legal Description (NAD27only) StaxinuCoordinuteo: - CD5-99L1wp1I Kick-off Point CPAII Coordinate Converter From: Datum: lNA683 ~1 Region: J-aj,^��.J (�Latitudekongitude |DrcimuDeoree` Y~ UTH Zone[- F- South r� StatePlane Zone:]4 ~J Units: jus-ft��1 Starting Coordinates: -------'---- --------- To Datum: Region: r' Latitude/Longitude IDecimal Deomoo "J /~ UTN Zone: [T�e��� [- South 6/ StatePlane Zone: |4 ~] Units: (-LeguDwscriptio (NA027only) Ending Coordinates: To: --- Datum: NXb |NXD27 ~J Region: / /_--_ (` Latitude/Longitude/ |D _-_-_~--- _3 r UTN Zone: F- F- South r StatePlano Zone: |4 ` I Units: o/ Legal Description (NAD27only) Legal Description Township: ���- �-�7 Runoo �[�-� ��--1 ' r`_�x '' }^ Meridian: |U ~l Section Quit Transform CD5-99L1w 11 Top of Production EZ. CPAi Coordinate Converter o Datum: NAD83 Region: :alaska t-' Latitude/Longitude [Decimal Degrees t` UTM Zone: F South Skate Plane Zone: 4 Units: us-ft f" Legal Description (NAD27 only) Starting Coordinates: -- X: 1501171.00 Y 5958286 00 To:.____-------.—_..__----_-_.____________ Datum: NAD27 � Region: alaska r Latitude/Longitude Decimal Degrees E r UTM Zone: True f— South ' Stake Plane Zone:', Units: us fk (' Legal Description (NAD27 only) Ending Coordinates:-------._ X: 361137.694044287 Y: 5958539 6078946 € Transform Quit Help CD5-99L1w 11 Top of Production fZ, CPAI Coordinate Converter o Q From: -- Datum: INZ83 j Region: jalaska C' Latitude/Longitude Decimal Degrees UTM Zone: I— South d: Skate Plane Zone: Units: 4 us ft 111 Legal De cripuon (NAD27 onLyj Starting Coordinates: -_------- X: 11501171.00 Y: 5958286.00 -To: Datum: INAD27 Region: alaska C' Latitude/Longitude Decimal Degrees t UTM Zone: True r South State Plane Zone: 4 Units: us ft T r% Legal Description (NAD27 only) Legal --- Township: 011 N . Range: 004 E Meridian: 1u I Section: FNL 2164.5645 IFEL TI jj252'.E619 Transform I Quit Help CD5-99L1wp11 Intermediate Casing I 5949010.20�c,d-dinate Converter r� To: Datum: N83 Region: alaska Datum: NAD27 Region: ADalaska i LatitudelLongitude 6Deciimal Degrees "LatitudelLongitude Decimal Degrees UTM Zone: j` South UTM Zone: True South C. State Plane Zone: 4 Units: us ft Zone: us Ft4+ Legal Description (NAD27 only) i Legal Description (NAD27 only) Starting Coordinates: — - - Ending Coordinates: X: 1501171.00 ( X: 361137.694044287 j j Y: 5958286.00 ( Y: 5958539.6078946i� ( i Transform Quit Help CD5-99L1w 11 Intermediate Casing M CRM1 Coordinate Converter From: Datum: Ngp83 Region: alaska I— Latitude/Longitude Decimal Degrees 4 r UTM Zone: r South I t: State Plane Zone: 4 Units: us fk > ` Lei�al (? . mion I.PdAC';27 onL) Starting Coordinates: - - X: ^ ^ 1501171.00 Y: 5958286- _.00 i To: Datum: NAD27 Region: falaska f" Latitude/Longitude Decimal Degrees I t"- UTM Zone: True F South State Plane Zone: I ' Units: F us-ft I Legal Description (NAD27 only) Legal Description Township: 011 N . Range: 004 E .r Meridian: JU I Section:21 I FNL 2164.5645 FEL 1282.6819 i Transform Quit Help ..... CD5-99L1w 11 TD CPAI Coordinate Converter o From:.—_��_��_� ----- _ 3-To: f Datum: NAD83 Region: jalaska I Datum: NAp27 Region: alaska + C Latitude/Longitude Decimal Degrees " Latitude/Longitude IDecimal Degrees 1 C UTM Zone: South i ! r UTM Zone: True f— South r- State Plane Zone: 4 + Units: us fk t State Plane Zone: 4 Units: us ft + I C- Legal Description (NAD27 only) i i E Legal Description (NAD27 only) Starting Coordinates: Ending Coordinates: X: 11505900.61 i X: 365866. $47267807 _ Y: 15949010.20 ; � Y:I 5949263.51045571 1 :.........................................................., ( .................Transform Quit Help j CD5-99L1wp11 TD f CPAI Coordinate Converter From: To: e.� Datum: NgD63 + Region: alaska Datum: NAD27 Region: alaska ! 9 Qecimal Qegrees i" Latitude/Lon itude �� E r Latitude/Lon itude� I 9 Decimal Qegrees + r UTM Zone: r South } UTM Zone: True r South i C: Stake Plane Zone: 4 Units: us-ft i Stake Plane Zone: 4 + Units: us ft + j > " Le�.l G�Fsc:ripi=_gin ;ii���7 �rd,j l Legal Description (NAD27 only) Starting Coordinates: -- -- --- Legal Description -- --- ------ X: 1505900.61 j Township: 011 N + Range: 004 E + E Y: 594 0010.20 Meridian: ju +I Section:34 I FN L + 794.06342 FE L 1683.5266 Transform Quit Help Tollerable Collision Risk Worksheet REV I DATE I BY I CK I APP DESCRIPTON REV DATE I BY I C,, I APP DESCRIPTION 1 4/24/15 1 CZ I DB I C.A. UPDATED PER K150003ACS 2 5/2/16 CZ I GD I C.A. I UPDATED PER K160003ACS ALPINE SATELLITE DEVELOPMENT Li I LOCATION OF _ THIS SURVEY CD-T12 PAD PAD T11 N CD4 TO ALPINE CD5 " D i ' <' ACCESS ROAD Fx ;eat / C D � Q�9 D ILYF � Q `� IT cD1 TP VICINITY MAP NOT TO SCALE LEGEND: O PROPOSED CONDUCTOR • EXISTING CONDUCTOR SECTION 7, T. 11 N., R. 4 E., U.M. SECTION 18, T. 11 N., R. p CD-5 P P OF a P A D SHp��pER og p`LS\GN ,G�QQa01oa xxXoo�� • • �� aso ;;x O`o� ::' • ! ! nx j,, �XW • .. . - n pQ a�OO�Xx,x,�N io`D �•!!r�Cp5,x�4- PLANT N N 10 NOTE: 15*4o 52" CONDUCTOR CD5—x14 WAS PLUGGED AND 1\0 LCMF ABANDONED APRIL 2016. �! `�\z KUUKPIK UMIAQ ALPINE SURVEY OFFICE PHONE : 907-670-4739 �.� ALPINE MODULE: CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD-5 WELL CONDUCTORS Alaska, Inc. AS —BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 15-03-02-1 04/18/2015 I CE—CD50-1025 1 1 OF 3 2 1 1 14/24/15 1 CZ 1 DB I C.A.1 UPDATED PER K150003ACS 1 2 15/2/161 CZ I GD I C.A.1 UPDATED PER K160003ACS ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC. 18, T 11 N, R 4 E, U.M. SEC.LINE O/S EXIST. I CD5-x99 5,965,666.90 1 489 591.67 70' 18 49.211 151' 13 20.820 287 2508 27.5 33.9 -x 6 1 CD5-x02 5,965,656.28 1,489,553.29 70' 18 49.099 151' 13 21.934 299 2470 28.1 34.1 CD5-x03 5,965,650.92 1,489,534.00 70' 18 49.042 15113 22.493 305 2451 28.4 34.1 CD5-x04 5,965,645.24 1,489,514.77 70' 18 48.982 151' 13 23.051 311 2432 26.6 34.2 CD5-x05 5,965,639.80 1,489,495.46 70' 18 48,925 151' 13 23.611 316 2412 28.1 34.3 CD5-x06 5,965,634.56 1,489,476.20 70' 18 48.870 151' 13 24.170 322 2393 27.7 34.3 CD5-x07 5,965,629.08 1,489,457.08 70' 18 48.812 151' 13 24.724 328 2374 27.9 34.3 CD5-x08 5,965,623.88 1,489 437.69 70' 18 48.757 151' 13 25.287 334 2355 28.1 34.3 CD5-x09 5,965,618.27 1,489,418.53 70' 18 48.698 151' 13 25.842 340 2336 27.3 34.2 CD5-x10 5,965,613.12 1,489 399.13 70' 18 48.644 151' 13 26.405 345 2317 28.1 34.1 CD5-x11 5,965,607.66 1,489,379.86 70' 18 48.586 151' 13 26.964 351 2297 27.9 34.1 CD5-x12 5,96 602.23 1,489,360.56 70' 18 48.529 151' 13 27.524 357 2278 28.0 34.1 CD5-x13 5,965,596.59 1,489,341.43 70' 18 48.470 151' 13 28.079 363 2259 26.1 34.2 5,965,591.36 ,48 36-8- 2246' 27.6 3�Z' CD5-14X 5,965,589.94 1,489,317.35 70' 18 48.400 151' 13 28.777 370 2235 27.5 33.8 CD5-x15 5,965,586.10 1,489,303.11 70' 18 48.359 151' 13 29.190 373 2221 26.8 34.2 CD5-x16 5,965,580.48 1,489,283.58 70' 18 48.300 151' 13 29.757 380 2202 27.6 34.0 CD5-x17 5,965,575.11 1,489,264.31 70' 18 48.243 151' 13 30.316 386 2183 27.7 34.0 CD5-x18 5,965,569.79 1,489,245.23 70' 18 48.187 151' 13 30.869 391 2164 27.7 33.9 CD5-x19 5,965,564.42 1,489,225.90 70' 18 48.131 151' 13 31.430 397 2144 28.0 33.9 CD5-x20 5,965,558.96 1 489 206.70 70' 18 48.073 151' 13 31.987 403 2125 25.8 33.8 CD5-x21 5,965,553.51 1,489,187.22 70' 18 48.016 151' 13 32.552 409 2106 27.8 33.8 CD5-x22 5 965 548.14 1,489,168.15 70' 18 47.959 151' 13 33.105 415 2087 27.7 33.7 CD5-x23 5,965,542.72 1,489,148.81 70' 18 47.902 151' 13 33.666 420 2068 26.4 33.7 CD5-x24 5,965,537.42 1,489,129.64 70' 18 47.846 151' 13 34.222 426 2049 28.0 33.7 CD5-x25 5,965,532.01 1 489 110.28 70' 18 47.789 151' 13 34.783 432 2029 27.7 33.7 CD5-x26 5,965,526.59 1,489,091.09 70' 18 47.732 151' 13 35.340 438 2010 26.3 33.7 CD5-x27 5,965,521.20 1,489,071.88 70' 18 47.675 151' 13 35.897 444 1991 27.5 33.7 CD5-x28 5,965,515.81 1 489 052.48 70' 18 47.618 151' 13 36.460 449 1972 27.4 33.6 CD5-x29 5,965,510.40 1,489,033.34 70' 18 47.561 151' 13 37.WE- 455 1953 27.6 33.6 CD5-x30 5,965,504.97 1,489,014.02 70' 18 47.504 151' 13 37.575 461 1934 25.3 33.6 CD5-x31 5,965,499.57 1 489 994.73 70' 18 47.447 151' 13 38.135 467 1915 26.6 33.6 CD5-x32 5,965,494.13 1,488,975.45 70' 18 47.390 151' 13 38.694 473 1895 26.8 1 33.6 CD5-x33 1 5,965,488.75 1,488,956.35 70' 18 47.333 1 151' 13 39.248 478 1876 27.0 1 33.6 NOTES 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 83. KU771�UKPIK 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.L.) U M I A Q 3. CONDUCTOR CD5-x14 WAS PLUGGED AND ABANDONED APRIL, 2016. ALPINE SURVEY OFFICE PHONE: 907-670-4739 y� ALPINE MODULE: CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD-5 WELL CONDUCTORS Alaska, Inc. AS -BUILT LOCATIONS CADD FILE N0. DRAWING N0: PART: REV: 15-03-02-1 04/18/2015 CE-CD50-1025 1 1 of 3 2 Haagen Dazs Necessary Plan Request (NPR) Cl T11 NR3E ASRC-NPR4 7 W ASRC-AA092344 AA081817 CD5-99 Trajectory CD5-99 Open Interval ❑ CPAI Lease 1ti.. 26J u 116 ConocoPhillips CD5-99 Alaska, Inc. Lease Map nN 0 02 04 0.6 0.8 /\ Miles ASRC-NPR2 ADL387207 ADL387208 ADL380075 T11 NR4E ADL387209 ASRC-NPR4 ASRC-NPR2 v� T10NR4E 4 ADL380077 TRANSMITTAL LETTER CHECKLIST WELL NAME: C.__bS - 7q L1k PTD: '�l 10 - 01 Development Service _ Exploratory _ Stratigraphic Test Non -Conventional FIELD: (fJ0 6 L �U+ T POOL: (� I V I JI'�. R%\(4rkp , ► � 01 Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. 416 — 973 , API No. 50-LQA_-Q- 00 - C50 . (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -� from records, data and logs acquired for well (name onpermit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool COLVILLE RIVER, ALPINE OIL - 120100 PTD#:2160940 Company CONOCOPHILLIPS ALASKA INC Initial Class/Type Well Name: COLVILLE RIV UNIT CD5-99L1 Program DEV Well bore seg d❑ DEV / PEND GeoArea 890 Unit 50360 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D) NA 1 Permit fee attached NA 2 Lease number appropriate Yes FEEOONPRA4, Surf; FEEOONPRA2, Top Prod & TD, ADL0387208, Portion Prod, ADL0387209, Portion Prod. 3 Unique well name and number Yes CRU CD5-99L1 4 Well located in a defined pool Yes COLVILLE RIVER, ALPINE OIL - 120100, governed by Conservation Order No. 443B. 5 Well located proper distance from drilling unit boundary Yes CO 443B contains no spacing restriction with respect to drilling unit boundaries. 6 Well located proper distance from other wells Yes CO 443E has no interwell spacing restrictions. 7 Sufficient acreage available in drilling unit Yes 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes Wellbore will be more than 500' from an external property line where ownership or landownership changes. 10 Operator has appropriate bond in force Yes Appr Date 11 Permit can be issued without conservation order Yes 12 Permit can be issued without administrative approval Yes PKB 7/26/2016 13 Can permit be approved before 15-day wait Yes 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For NA 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre -produced injector: duration of pre -production less than 3 months (For service well only) NA 18 Conductor string provided NA Conductor set in CRU CD5-99 Engineering 19 Surface casing protects all known USDWs NA Surface casing will be set in CRU CD5-99 20 CMT vol adequate to circulate on conductor & surf csg NA Surface casing will be set and fully cemented 21 CMT vol adequate to tie-in long string to surf csg NA 22 CMT will cover all known productive horizons No Productive interval will be completed with uncemented liner w/ perf pups 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig has steel tanks; all waste to approved disposal wells 25 If a re -drill, has a 10-403 for abandonment been approved NA 26 Adequate wellbore separation proposed Yes Anti -collision analysis complete; no major risk failures 27 If diverter required, does it meet regulations NA Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Max formation pressure is 3714 psig(9.4 EMW); will drill w/ 9.5 ppg EMW VTL 8/4/2016 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MPSP is 2945 psig; will test BOPS to 3500 psig 31 Choke manifold complies w/API RP-53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S measures required 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No H2S measures required. Geology 36 Data presented on potential overpressure zones Yes Expected reservoir pressure is 9.45 ppg EMW; lateral will be drilled using 9.5 ppg mud. Appr Date 37 Seismic analysis of shallow gas zones NA PKB 7/26/2016 38 Seabed condition survey (if off -shore) NA 39 Contact name/phone for weekly progress reports [exploratory only] NA Onshore development lateral to be drilled. Geologic Engineering Public Commissioner: Date: Co ssioner• Date Commissioner Date