Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout206-138~. ~ ~ ~~ r `'. wit= . ~~ ~ ~ ,; ~ ., r ~ ~ ~~~ f~, ~ -.. MICROFILMED 6/30/2010.. DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc ~ ~ .,. .,., / - -i=~..'l~~ . :~ 9rrt ; l''i:i 3 ' r~°:~~.~';oJ ~~~~ ~~~~~Z ~~T~~ ~~~~~~1~~~~~~~~ ~mclc~sed ~.~-~ t~s~ ~?at~,r~al~ l~st~~l ~elos~v. . .a , ~- ~ ~ _~~~~~~''~~t' JU~. .~ :~~~C~ Ii you have any questions, please contact doe ~.astuflca a~ (~J071564-4(D9 i Delivery Contents Bottom SW Name Date Contractor Run To De th De th Descri tion POWER PULSE R-T GAMMA RAY/ARC GAMMA RAY/ARC RESISTIVITY - MEASURED NS33 04-09-2007 SCH 1-6 684 23460 DEPTH LOG POWER PULSE R-T GAMMA RAY/ARC GAMMA RAY/ARC RESISTIVITY - TRUE NS33 04-09-2007 SCH 1-6 200 23460 VERTICAL DEPTH LOG POWER PULSE R-T GAMMA RAY/ARC GAMMA RAY/ARC RESISTIVITY - TRUE VERTICAL DEPTH SUB SEA NS33 04-09-2007 SCH 1-6 200 23460 LOG '~ ~ CD-ROM - POWER PULSE R-T ~ 3 ~ GAMMA RAY/ARC GAMMA ~~ ' ~~a RAY/ARC RESISTIVITY - j'~ MEASURED DEPTH LOG, TRUE VERTICAL DEPTH LOG, TRUE VERTICAL SUB SEA NS33 04-09-2007 SCH LOG POWER PULSE R-T GAMMA RAY/ARC GAMMA RAY/ARC RESISTIVITY - MEASURED NS33PB1 03-30-2007 SCH 1-6 684 23236 DEPTH LOG POWER PULSE R-T GAMMA RAY/ARC GAMMA RAY/ARC RESISTIVITY - TRUE NS33P61 03-30-2007 SCH 1-6 200 23236 VERTICAL DEPTH LOG POWER PULSE R-T GAMMA RAY/ARC GAMMA RAY/ARC RESISTIVITY - TRUE VERTICAL DEPTH SUB SEA NS33PB1 03-30-2007 SCH 1-6 200 23236 LOG CD-ROM - POWER PULSE R-T GAMMA RAY/ARC GAMMA RAY/ARC RESISTIVITY - ft nFACI,JRFn nGpTN ~p~, TRUE VERTICAL DEPTH LOG, TRUE VERTICAL SUB SEA NS33PB1 03-30-2007 SCH LOG Petrotechnical Data Center LR2-1 ~ 900 E. Benson Blvd. PO Box 196612 Anchora~e, AK 995 1 9-66 1 2 i ~ ~ ~ ~; ~ • _. .i, vl: ~.i../ , . ~nstri ~~ i i-a_~c~ :~ ;v~~ ~ ~~ ~ ~I~F,T , ~ , T~ ~'~' ~ "~'T~ /~ ~T.~ ~/~'t'T"T A ~ I\IS33A 04--16-2009 SCF-! ^0 25617 25828 i ST~c3P-iOSCOPc 475 NS33A 04-16-2009 SCH CD-ROf~1- STE i HOSCO~E 4.7 , Please Sign and Return one copy of this transmittal. Thank You, Joe Lastufka Petrotechnical Data Center BPXA AOGCC DNR MMS Murphy Exploration David Fair Christine Mahnken Corazon Manaois Doug Chromanski Ignacio Herrera Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 995 1 9-66 1 2 ~~ ~~ DATA SUBMITTAL COMPLIANCE REPORT 5/7/2009 Permit to Drill 2061380 Well Name/No. NORTHSTAR UNIT NS-33 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23325-00-00 MD 23460 TVD 9450 Completion Date 4/26/2007 Complet ion Status SUSP Current Status P&A UIC N REQUIRED INFO RMATION _. ~_ Mud Log No Samples No Directional Survey /- __ ATA INFORMATION __ __ _ - __ ___. _ __ - _ - __ Types Electric or Other Logs Run: MWD, GR, PHOTO-GYRO, IFR/CASAN DRA, RES, PWD (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments 15246 Report: Final Well R Open 6!28/2007 PB1 and PB2 Final Well Report, Gen Info, Daily Sum, Morning Report, Bit Record, Mud Rec, Show ', Rec, Survey Reports, Days i vrs Depth w/Graphics PDF, EMF, Tif, LAS og 15246 Mud Log 2 Col 199 23238 Open 6/28/2007 P61 TVD Combo Mud Log ~og 15246 Mud Log 2 Col 199 23238 Open 6/28/2007 P61 MD Combo Mud Log p µ'Log 15246 Mud Log 2 Col 199 23460 Open 6/28/2007 PB2 TVD Combo Mud Log ~~~~¢c ~~'<<- ~og 15246 Mud Log 2 Col 199 23460 Open 6/28/2007 P62 MD Combo Mud Log ~ ~K~.l ~~'i- ~D C Las 15267 See Notes 0 0 Open 7/6/2007 P61 LAS Raw Field Data/ Field Composites w/Graphics Word, PDS, ~ og 15267 Corrosion 5 Col 1 100 5500 Open 7/6/2007 PB1 USIT Corrsion Log, GPIT, GR, CCL 29-Apr- ', 2007 wog 15267 Induction/Resistiviry Blu 200 23236 Open 7/6/2007 PB1 TVD Vision Resistivity (~ 27-Jan-2007 -Log 15267 Induction/Resistivity Blu 200 23236 Open 7/6/2007 PB1 MD Vision Resistivity 27-Jan-2007 ~D C Las 15268 See Notes 0 0 Open 7/6/2007 PB2 LAS Raw Field Data/ I~ Field Composites w/Graphics Word, PDS, DATA SUBMITTAL COMPLIANCE REPORT 5/7/2009 Permit to Drill 2061380 Well Name/No. NORTHSTAR UNIT NS-33 23460 ~~09 ~' Log C Asc Rpt r~D D Asc R r,ED D Asc j~t og ED C Pds I COED C Pds Well Cores/Samples Information: Name Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23325-00-00 TVD 9450 Completion Date 4/26/2007 Completion Status SUSP Current Status P&A UIC N 15268 Induction/Resistivity 2 Blu 200 23460 Open 7/6/2007 P62 TVD Vision Resisitivity 9-Apr-2007 15268 Induction/Resistivity 2 Blu 200 23460 Open 7/6/2007 PB2 MD Vision Resisitivity 9-Apr-2007 i, Directional Survey 0 4400 Open 7/10/2008 j ~ Directional Survey 0 4400 Open 7/10/2008 ~~ Directional Survey 0 23236 Open 9/3/2008 PB 1 Directional Survey 0 23236 Open 9/3/2008 PB 1 Directional Survey 0 23460 Open 9/3/2008 PB 2 r~.,~.f t'~` ~y Directional Survey 0 23460 Open 9/3/2008 PB 2 r'z~t t¢cl i- Sonic 5 Col 100 15550 Case 3/10/2009 USIT Cement and Corrosion Eval, GR, CCL, GPIT, USIT 29-Jan-2009 17681 Sonic 100 15550 Case 3/10/2009 USIT Cement and Corrosion Eval, GR, CCL, ~ GPIT, USIT 29-Jan-2009 Sonic 5 Col 200 14100 Case 5/1/2009 USIT Cement and Corrosion Eval, GR, CCL, ', GPIT, USIT 14-Apr-2009 17934 Sonic 200 14100 Case 5/1/2009 USIT Cement and Corrosion Eval, GR, CCL, GPIT, USIT 14-Apr-2009 Sample Interval Set Start Stop Sent Received Number Comments DATA SUBMITTAL COMPLIANCE REPORT 5/7/2009 Permit to Drill 2061380 Well Name/No. NORTHSTAR UNIT NS-33 Operator BP EXPLORATION (ALASKA) INC MD 23460 ND 9450 Completion Date 4/26/2007 Completion Status SUSP Current Status P&A ADDITIONAL INFORMATION Well Cored? Y ~ Daily History Received? N ~~ ~/ N Chips Received? Formation Tops Analysis Y7-Fr Received? Comments: API No. 50-029-23325-00-00 UIC N C Compliance Reviewed By: __ _ _ _ _ __ __ _ Date: I _ v-~+~ _ ~w - -, i~ ~f ~P~[-1 7Y 9~L~ ~L~TA TL~1`7 ~1y3~TTL~~ Enclosed are the materials listed below. e~\3`~ ~~A~ i a ~~~~ t 1~~~~ 1 ~- 1``~ ~~, a3~ 1~ If you have anv questions. please contact Joe Lastufka at (9071564-4091 Transmiital Number: 9306% Deliver Contents SW Name Date Contractor Run To De th Bottom De th Descri tion ULTRASONIC CEMENT/ NS33 04-14-2009 SCH 1 200 14100 CORROSION EVALUATION CD-ROM -ULTRASONIC CEMENT/ CORROSION NS33 04-14-2009 SCH EVALUATION NS19 04-19-2009 SCH 1 13650 13830 PERFORATING RECORD CD-ROM -PERFORATING NS19 04-19-2009 SCH RECORD PRODUCTION PROFILE W/ NS19 04-19-2009 SCH 1 13700 13930 DEFT & GHOST CD-ROM -PRODUCTION NS19 04-19-2009 SCH PROFILE W/DEFT & GHOST PRODUCTION PROFILE W/ NS16A 04-20-2009 SCH 1 14200 14365 DEFT & GHOST CD-ROM -PRODUCTION NS16A 04-20-2009 SCH PROFILE W/ DEFT & GHOST :~ Please Sign and Return one copy of this transmittal. Thank You, Joe Lastufka Petrotechnical Data Center AOGCC Murphy Exploration MMS DNR BPXA Petrotechnical Data Center LR2- I 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99~ 19-6612 Christine Mahnken Ignacio Herrera Doug Chromanski Kristin Dirks David Fair ,~~~~ -~~PR 1 ~ 200 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMM~SION ~°) C~OETION OR RECOMPLETION REPORT AND LOG ,~ ~'tt`~`"~~~``~`" Revision: Correction BHL and ND's 1 a. Well Status: ^ Oil ^ Gas ^ Plugged ®Abandoned ~ ^ Suspended zoAAC zs.~os zoAAC zs.~~o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero 1 b. Well Class: ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 2/3/2009 12. Permit to Drill Number 206-138 - 308-401 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 1/29/2007 13. API Number 50-029-23325-00-00 - 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 4/3/2007 14. Well Name and Number: NS33 ' 1369 FSL, 650 FEL, SEC. 11, T13N, R13E, UM Top of Productive Horizon: N/A 8. KB (ft above MSL): 56.6' ~ Ground (ft MSL): 16.1' 15. Field /Pool(s): Northstar Field /Northstar Pool Total Depth: 3266' FSL, 940' FEL, SEC. 32, T14N, R13E, UM 9. Plug Back Depth (MD+TVD) 15037 - 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 659821 y- 6031141 Zone- ASP4 10. Total Depth (MD+TVD) 23460 - 9458 16. Property Designation: ADL 312798 TPI: x- N/A y- N/A Zone- N/A Total Depth: x- 643417 y- 6043265 Zone- ASP4 11. SSSV Depth (MD+TVD) N/A 17. Land Use Permit: LO-N96-006 18. Directional Survey ^ Yes ®No Submit electronic nd rinte inf rm i n r 20 AA 25.050 19. Water depth, if offshore 39' ft MSL 20. Thickness of Permafrost (TVD): 370' 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): MWD, GR, PHOTO-GYRO, IFR/CASANDRA, RES, PWD 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HALE AMOUNT WT. PER FT. - GRADE TOP BOTTOM TOP BOTTOM SIZE- CEMENTING RECORD PULLED 24" 24 .6# X-56 Surface 1 Surface 190' Driven 1 4# rf 4472' 1" 7 x 1 ' 11- /4" 60# S-95 Surf 16491' Surf ce 7 14-3/4" 1 1 x Lit Cre a 53 x ss'G' 23. Open to production or inject ion? ^ Yes ®No 24. TusING RecDRD If Yes, IISt each I (MD+TVD of Top & Bottom; Pe nterval Open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD N/A None None MD TVD MD TVD 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC, ^~ ~~ ' _ ~"~~ DEPTH INTERVAL MD AMOUNT & KIND OF MATERUIL USED 15037 Set Whipstock 15065' Set CIBP 16415' Set EZSV with 228 Bbls LiteCrete, 85 Bbls 'G' 26. PRODUCTION TEST .Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date of Test: Hours Tested: PRODUCTION FoR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PfeSS. Casing Press: CALCULATED 24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^ Yes ®No Sidewal l Core s A wired? ^ Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None ~ ~ ~ ~~~ ~ ~ 2~~~ .dot ~~ A Form 10-407 Revised 02/2007 CONTINUED ON REVERSE .SIDE /' ~l~ ~. Cs n 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND MARKERS ENCOUNTERED): 29. FORMATION TESTS NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Ugnu 9245' 4744' None Colville 16128' 6922' Kalubik 21955' 8752' Kuparuk 22310' 8895' Formation at Total Depth (Name): 30. List of Attachments: Summary of Daily Drilling Reports and a Well Schematic Diagram. 31. I hereby certify that the for oing is true and correct to the best of my knowledge. Si d O~y I `- -(]~ 'y J ~ gne ~ Title Drilling Technologist Date t Sondra ea NS33 206-138 308-401 Prepared By NamefNumber. Sondra Sfewman, 564-4750 Well Number Permi . / A r v I N Drilling Engineer: Ken Allen, 564-4366 INSTRUCTIONS GENeRaL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITeM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITeM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITeM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITeM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITEM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only Page 1 of 2 Maunder, Thomas E (DOA) From: Allen, Kenneth W [Kenneth.Allen@bp.com] Sent: Friday, March 20, 2009 4:43 PM To: Hubble, Terrie L; Maunder, Thomas E (DOA) Cc: Stewman, Sondra D; Jackson, William C (Landmark); Kara, Danny T Subject: RE: NS33 (206-138) We accepted the rig and did everything as per Sundry. We just did not switch in DIMS for AFE'ing purposes. Ken Allen Drilling Engineer Northstar Mobile: 907.748.3907 Office: 907.564.4366 e-mail: Kenneth.Allen@BP.com From: Hubble, Terrie L Sent: Friday, March 20, 2009 3:47 PM To: Maunder, Thomas E (DOA) Cc: Stewman, Sondra D; Allen, Kenneth W; Jackson, William C (Landmark) Subject: RE: NS33 (206-138) Hi Tom, Prior to Nabors 33E accepting on NS33A, the rig was in "Maintenance & Mobilization" Status. They were sitting over the well at the time, but had not accepted. It looks like they conducted some operations in the M&M status that should have been under NS33A. I have included the two daily reports prior to accepting on this well. That is where the NU and testing of the BOP's occurred. Will this satisfy your inquiry? 'G'~~Sc-~S ~c~C.w~E~ vs ~ ~~~ Thanks! `~ Terrie From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Thursday, March 19, 2009 8:23 AM To: Stewman, Sondra D Cc: Hubble, Terrie L Subject: RE: NS33 (206-138) Sondra, Hadn't heard back from you and wanted to follow up. Tom 3/20/2009 ' • ~ Page 2 of 2 From: Maunder, Thomas E (DOA) Sent: Friday, March 13, 2009 2:50 PM To: 'Stewman, Sondra D' Subject: NS33 (206-138) Sondra, I am reviewing the 407 submitted for the abandonment of this well. Do you have any daily report information prior to 1/25/09? The operations summary begins POOH with the kill string. I would have expected there to be other operations accomplished including NU and test of BOP. Thanks in advance. It is acceptable to send in any additional reports via email. Call or message with any questions. Tom Maunder, PE AOGCC 3/20/2009 Page 1 of 2 Maunder, Thomas E (DOA) From: Kara, Danny T [Danny.Kara@bp.com] Sent: Wednesday, March 18, 2009 3:56 PM To: Maunder, Thomas E (DOA) Cc: Regg, James B (DOA); Crane, Lowell R; Allen, Kenneth W Subject: RE: NS33 (206-138) Tom, please see responses to your questions in red. Thanks. Daun~~ Kat°:- En~~inccring Tcar,~ Lcad No~~thstar/Miln~ Point/Endicott Drilling 564-5667 (oi'ficc)/240-8047 (cell}/564-4440 (Faxj ~<&taC~~. ~',~~?.COtll From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Monday, March 16, 2009 11:41 AM To: Kara, Danny T Cc: Regg, James B (DOA) Subject: NS33 (206-138) Dan, I am reviewing the completion report for the P&A of this well for redrill and have some questions. 1. When entry is made into the well to replace the fluids, metal shavings are reported in the "cuttings" while circulating at 11000'. After tagging at 16254', the shakers are reported to be blinding. As circulation continues, the metal amount drops off but is still reported as "10%". Was any analysis done to identify the source of the metal shavings? No analysis was done to determine source of metal shavings. The BHA use to trip to TD included a full gauge string mill. This is the same string reamer used for window milling, located behind the starter mill. We ran this to drift the 11-314" prior to tripping in hole with the CIBP. The metal shavings were assumed to be from the 11-3/4" casing, generated by rotating the string mill while displacing out the MOBM. -^his was unanticipated -the string mill should not have worn casing. We believe the string mill reduced the casing wall thickness while circulating rotating at 16,254' and (reciprocating over a stand), for ~24 hours. This is where we believe the casing failed when attempting to pressure test to 4000 psi. 2. During the attempted casing test, it appears that the casing burst. 4000 psi is only - 60% of the published burst for the 11-3/4" pipe. Using an RTTS the casing was subsequently successfully tested to 3022 psi above 15203'. A CIBP was set at 15065' and the casing successfully tested to 2000 psi. What is the basis of the differing test pressures? After recognizing we impacted the 11-314" casing with string mill rotation, we ciid not want to unduly stress the 11- 3/4" with any more pressure than needed for well control to drill ahead. Fail another 4000 psi pressure test could have resulted in running a scab liner. This would have had significant impacts on circulating hydraulics (ECD) given the ID reduction. We therefore tested to 3000 psi, which is greater than the required casing pressure test to 50% of the working pressure of the BOPS. The 2000 psi test was a test of the CIBP, not a casing test. The well bore has recently passed another test to 2,800 psi with 11 ppg mud after cementing the 8-5/8" drilling liner in place. 3/20/2009 Page 2 of 2 3. What were the results of the USIT run on 1/29/09? The USIT was logged from -500' below the planned CIBP setting depth to surface. The log showed the 11-3/4" to have some casing wear, primarily from all the rotations made during the fir:~t attempt at drilling NS33. There is clearly more casing wear at -11,000' md, the string mill depth while rotating/c:irculating out the MOBM for 4.5 hours. The average wall thickness is well within new specs, but when isolating the minimum wall thickness (as expected) there is a wear pattern on the low side of the casing. As mentionec previously, the 11,000' interval has the most wear on the low side. We are looking at options to scab over this arE~a. One possibility is extending the current (planned) 6-5/8" scab over this interval. 4. What operations are currently underway? We are currently in the hole with a dump iron BHA circulating in LCM to plug ,~ lost circulation interval below the 8- 5/8" shoe. We were unsuccessful at getting the 8-5/8" liner to bottom. The liner shoe is -23,540' and (Kuparuk D) and openhole TD is at 24,150' and (Miluveach shale), placing the shoe 610' offi bottom. We are experiencing losses with pressures exceeding --13 ppg, most probably thru a fault at base of Kuparuk/Miluveach top. After getting losses under control, with either LCM or cement, we plan to trip for the drilling BHA to drill up the MiluveachlKingak to TSAG. Ken Allen has ordered a string of 9-5/8" in the event we have to cover up the 11-3/4" pipe, due to pipe wear. We have enough pipe to scab back to surface if necessary. We will wait until openhole drilling is completed before scabbing back to prevent ECD constraints during planned drilling operations. A new USIT may be run to review casing wear after the majority of drilling has been completed to confirm if the casing is a concern for well bore integrity. We're planning on an IA of the completed welt that is good to 4200 i~si -we're intending on assuring enough steel is available to provide for that, for life of well. Thanks in advance. I look forward to your reply. Tom Maunder, PE AOGCC 3/20/2009 • Page 1 of 1 Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Monday, March 16, 2009 11:41 AM To: Dan Kara Cc: Regg, James B (DOA) Subject: NS33 (206-138) Dan, I am reviewing the completion report for the P&A of this well for redrill and have some questions. 1. When entry is made into the well to replace the fluids, metal shavings are reported in the "cuttings" while circulating at 11000'. After tagging at 16254', the shakers are reported to be blinding. As circulation continues, the metal amount drops off but is still reported as "10%". Was any analysis done to identify the source of the metal shavings? 2. During the attempted casing test, it appears that the casing burst. 4000 psi is only ~ 60% of the published burst for the 11-314" pipe. Using an RTTS the casing was subsequently successfully tested to 3022 psi above 15203'. A CIBP was set at 15065' and the casing successfully tested to 2000 psi. What is the basis of the differing test pressures? 3. What were the results of the USIT run on 1/29/09? 4. What operations are currently underway? Thanks in advance. I look forward to your reply. Tom Maunder, PE AOGCC 3/16/2009 ,~Y¢~,~ STATE OF ALASKA j ` ALASK~L AND GAS CONSERVATION COM~SION C~~f~ ~ ~ 2009 ~,~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG ~~~~ ~~,~ ~o i~ R~ ~~s Gons, Commissto~ 1 a. Well Status: ^ Oil ^ Gas ^ Plugged ®Abandoned- ^ Suspended zoAAC zs.~os zoAAC zs.»o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero 1 b. Well ®Development ~ ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 2/3/2009 ~ 12. Permit to Drill Number 206-138 308-401 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 1/29/2007 13. API Number 50-029-23325-00-00 ' 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 4/3/2007 14. Well Name and Number: NS33 1369 FSL, 650 FEL, SEC. 11, T13N, R13E, UM Top of Productive Horizon: N/A 8. KB (ft above MSL): 56.6' ~ Ground (ft MSL): 16.1' 15. Field /Pool(s): Northstar Field / Northstar Pool Total Depth: 3255' FSL, 973' FEL, SEC. 32, T14N, R13E, UM 9. Ptug Back Depth (MD+TVD) 15037, 6566 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 659821 y- 6031141 Zone- ASP4 10. Total Depth (MD+TVD) 23460. 9450 , 16. Property Designation: ADL 312798 TPI: x- N/A y_ N/A Zone- N/A Total Depth: x- 643385 y- 6043254 Zone- ASP4 11. SSSV Depth (MD+TVD) N/A 17. Land Use Permit: LO-N96-006 18. Directional Survey ^ Yes ®No S mi el ronic and rin information er 2 AAC 25.050 19. Water depth, if offshore 39' ft MSL 20. Thickness of Permafrost (TVD): 370' 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): MWD, GR, PHOTO-GYRO, IFR/CASANDRA, RES, PWD 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SErrING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 24" 245.6# X-5 urfa 1 urface 1 Driv n H 447 ' 1 1" x I ' 11-3/4" S- S dace 164 1' Surfa 7 31' 14-3/4" 1 1 x Li r 53 x I s' ' 23. Open to production or inject ion? ^ Yes ®No 24. TuiswG RECORD If Yes, list each i (MD+TVD of Top & Bottom; Pe nterval open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD N/A None None MD TVD MD TVD 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT 8c KIND OF MATERIAL USED 15037' Set Whipstock 15065' Set CIBP 16415' Set EZSV with 228 Bbls LiteCrete, 85 Bbls 'G' 26. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUfS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. CaSing PreSS: CALCULATED 24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^ Yes ®No Sidewal l Core s A wired? ^ Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None as 3-09-09 .. .~ ~, ::,.~.~. Form 10-407 Revised 02/2007 CONTINUED ON R~EVERSI` SIDE , . i L..- ~ ~ ~ -~ 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND ERS ENCOUNTERED): 29. FORMATION TESTS NAME MD TVD Well Tested? ^ Yes ®No , Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Ugnu 9245' 4736' None Colville 16128' 6915' Kalubik 21955' 8744' Kuparuk 22310' 8887' Formation at Total Depth (Name): 30. List of Attachments: Summary of Daily Drilling Reports and a Well Schematic Diagram. 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Sondr Stewman Title Drilling Technologist Date ~j -Q ~~ NS33 206-138 308-401 Prepared ey Name/Number. Sondra Stewman, 564-4750 Well Number Permi N . / A r v I No. Drilling Engineer: Ken Allen, 564-4366 INSTRUCTIONS GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 1007 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). Irea~ 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in okher spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITeM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only TRFF = A RB-~ GI S 118" 5k '' WEL~LHEAD =ABB-VGI 13 5/8" ACTUATOR = KB. ELEV = 56.6 BF. ELEV = KOP = 300 Max Angle = 73 @ 12743' Datum MD = Datum TV D = ~ ~s~~ • P &A 16" CSG, 84#, HCL-80, BTC, ID=15.010" 4472' 11 3/4" Whipstock H ^^1395+1} ~~ 11 3/4" HES EZSV Estimated 10 5/8" CSG PBTD 16243' 39 BBLS placed on top of Retainer CBU \ performed at 16,243` in green cement \ 11 3/4" HES EZSV Cement Retainer f-j 16415' 11 3/4" Csg, 60# S-95, Hydril 563. ID = 10.772" H 16491' 274 BBLS Squeezed below Retainer ~~' " -2,431 feet equivalent within \ 10-5/8" hole or -18,846` MD 16,940` Tight Hole Estimated 18,846` MD Bottom of Cement NS33 KOP - 21,828' NS33P61 - 23,236' \ NS33 - 23,460' DATE REV BY COMMENTS DATE REV BY COMMEIVrS 10/22/08 KWA SUSPEND®(NS33) 10/30/08 KWA NS33 Proposed P&A PRUDHOE BAY UNIT WELL: NS-33 PERMIT No: 206-138 API No: 50-029-23325-00-00 SEC:11, T13N, R13E, 1369' ESL, 650' FEL BP Exploration (Alaska) • BP AMERfCA Daily Operations Report Page 1 of 3 Operator: BP AMERICA Rig: NABOBS 33E Report: 24 Well: NS RIG 33E MAINTENA NCE/MOBILIZATION Event: MOBILIZATION Date: 1/23/2009 Field: NORTHSTAR Well Type: DEVELOPMENT "-~~ Current Well Status Depth MD: (ft) Casing Size: (in) Costs in: USD Rig Accept: 00:00 12/30/2008 Est. TVD: (ft) Casing (MD): (ft) Daily Mud: Rig Release: Progress: (ft) Next Casing Size: (in) Cum. Mud: Spud Date: Auth Depth: (ft) Next Casing (MD): (ft) Daily Well: WX Date: Hole Size: Next Casing (TVD): (ft) Cum. Well: Elev Ref: DOUDFS/Target: 24.00//30.00 Geologist: KB Elev: 40.00 (ft) Engineer: Ken Allen Tot. Personnel: 48 Supervisor: Bordes / Newlon Program: Cost Ahead: 0 USD, Days Ahead: 0.00 Weather: Cold & Clear Current Status: Nipple up BOP's 24hr Summary: Prep Rig for Drilling season, Prep cellar area for Nipple Up Operation, Test TWC (fail), Pull and Changout TWC, Test TWC (good test), ND Tree and set back on stand, Nipple up BOP's 24hr Forecast: NU BOP's, Test B OP's, UD 50 x 4 1/2" NSTC Tubing Comments: No Accidents, No Spills, No Incidents Weather: Temp -5 deg, Wind Chill - 24 deg, Wind Direction E @ 13 mph, Gust 17 Visibility 37 miles HSE & Well Control Days Since Last DAFWC: 1926 All Free Days: 23 Last Csg Test Press.: (psi) Last Envir. Incident: 2/17/2007 Last BOP Press. Test: Last Abandonment Drill: 1/23/2009 Next BOP Press. Test: Last Safety Meeting: 1/23/2009 Last Spill Drill: 1/23/2009 No. Stop Cards: 4 Regulatory Agency Insp: N Non-compliance Issued: N FIRE: 1/21/2009 MAN DOWN DRILL: 1/19/2009 Pump Slow Pump Rates (Girt) Slow Pump Rates (Choke) Slow Pump Rates (Kill) TVD: (ft) Stroke Rate Pressure() Stroke Rate Pressure() Stroke Rate Pressure() EMW: (PPg) MAASSP: (psi) Test Pressure: (psi) Kick Tolerance: (ppg) Kick Volume: (bbl) O erational Parameters ROP Daily: Rotating Weight: Daily Bit Hrs: (hr) Pum p Sta tus -Dril ling and Ri ser ROP Cum.: Pick Up Wt.: Daily Sliding Hrs:0.00 (hr) Pump Type Eff. Strokes Liner Size Circ. Rate WOB (min); Slack Off Wt.: Cum. Bit Hrs: Q Q Q () WOB (max): Circ. Rate Riser: RPM Min.: Circ. Rate Hole: Ann. Vel. Riser: (ft/min) RPM DH: Circ. Off Bottom: Ann. Vel. DC: (ft/min) Torq. on Bottom: Circ. On Bottom: Ann. Vel. DP: (fUmin) Torq. off Bottom: Jar Hrs since Inspect: (hr) Q eratlons Summar From-To Hrs Phase Task Activity Code NPT Operation Op. Depth (hr) 00:00-12:00 12.00 PRE MOB MOB P -PTSM, -Housekeeping -mist painting projects -Suck out fluid in drip pan below rotary before Nipple Up Operations -Prep cellar to remove tree -PJSM with Rig Crew and LRS on testing TWC -Test TWC to 250 psi Low and 5000 psi high -High pressure test failed -Mobilize Drill Site Maintenance from prudhoe to pull TWC -Perform Preventive Maintenance on Pipe Lay Down machine -Perform Maintenace on centrifuge feed pump, Link Tilt on TDS and Lights in Shaker Room -Floorhands continued with training with CanRig Technicians on CanRig Tq-Matic Wrench 12:00-00:00 12.00 PRE MOB MOB P -PTSM, -Housekeeping -mist painting projects Printed: 1/24/2009 4:40:18 AM • • BP AMERICA Daily Operations Report Page 2 of 3 Operator: BP AMERICA Rig: NABOBS 33E Report: 24 Well: NS RIG 33E MAINTENANCE/MOBILIZATION Event: MOBILIZATION Date: 1/23/2009 Field: NORTHSTAR Well Type: DEVELOPMENT O erations Summar From-To Hrs Phase Task Activity Code NPT Operation Op. Depth (hr) 12:00-00:00 12.00 PRE MOB MOB P -PJSM with Rig Crew and DSM on Pulling TWC -Pull TWC and clean debris from seal area and redress TWC, install TWC -PJSM with Rig Crew and LRS on testing TWC -Test TWC to 250 psi Low and 5000 psi high -Good Test -Reviewed Emergency Shut Down system for shutting in wells in the cellar area -Remove Tree and set back on stand in cellar -Inspect threads on tubing hanger, threads are in good shape, 18 turns to MU Crossover -Install Vetco Gray test dart into hanger -N/U Stack Barriers in well; -Cement Retainer @ 16,415' with 274 bbls of cement squeeze below and 39 bbls of cement on top of retainer, Top of Cement @ 16,243' Two Way Check plug in tubing hanger Personnel Company No. Hours Company No. Hours Company No. Hours ASRC ENERGY 2 FAIRWEATHER 1 NABOBS 3 NABOBS 24 QUADCO 8 M-I DRILLING FLUIDS 2 NABOBS 1 NABOBS 4 NABOBS 2 SCHLUMBERGER 1 Cumulative Phase Breakdown Planned Change of Scope Total Total Cost Phase Prod % Total NPT % Total WOW % Total Prod % Total NPT % Total WOW % Total Hours USD PRE 576.00100.0% 576.00 1,479,540.0 TOTALS 576.00 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 576.00 1,479,540.0 Remarks PJSM or HACL perform prior to all jobs Day Crew Rig Evacuation Drill Response time = 1 min 35 sec 1 x PTSM, 2 x PJSM, 6 x toolbox meetings /KSARS Night Crew SpillDrill Response time = 1 min 55 sec i x PTSM, i x PJSM, 6 x toolbox meetings /KSARS Personnel on Island: 2 WSL 1 BP Engineer 2 Nabors Toolpusher 3 Nabors Support Personnel 1 Nabors Senior Electrician 4 Quadco 2 MI Mud Engineer 1 AIC Lead Nights 1 AIC Crane Op Nights 1 CCI Enviro2 Nights 1 ARCA Housekeeper 2 CanRig Techs 2 AIC Techs Island Totals = 25 Travel to Island by hovercraft /Tucker Personnel commuting daily from Chugach Camp; 25 Nabors hands, 4 Quadco, 1 FWX Logistics, 1 K&M - 31 total Printed: 1/24/2009 4:40:18 AM ~ i BP AMERICA Daily Operations Report Page 3 Of 3 Operator: BP AMERICA Rig: NABOBS 33E Report: 24 Well: NS RIG 33E MAINTENANCE/MOBILIZATION Event: MOBILIZATION Date: 1/23/2009 Field: NORTHSTAR Well Type: DEVELOPMENT Remarks Ice Road Update:: Flooding road Ice road profiled average ice thickness 48.7" as of 1-15-2009 293 Jts of 5" S-135 19.5# NC-50 Drill Pipe in Pipe Shed -apx 9110' 207 Jts of 5" S-135 19.5# NC-50 Drill Pipe on Bench -apx 6520' Total- 500 jts 5" DP 17 Jts of 5" HWDP - 518' in Pipe Shed 23 Jts of 5" HWDP - 700' on Bench Total - 40 Jts 5" HWDP Printed: 1!24/2009 4:40:18 AM ~ ~ BP AMERICA Daily Operations Report Page 1 of 3 Operator: BP AMERICA Rig: NABOBS 33E Report: 25 Well: NS RIG 33E MAINTENANCE/MOBILIZATION Event: MOBILIZATION Date: 1/24/2009 Field: NORTHSTAR Well Type: DEVELOPMENT Current WeII Status Depth MD: (ft) Casing Size: (in) Costs in: USD Rig Accept: 00:00 12/30/2008 Est. TVD: (ft) Casing (MD): (ft) Daily Mud: Rig Release: 1/24/2009 Progress: (ft) Next Casing Size: (in) Cum. Mud: Spud Date: Auth Depth: (ft) Next Casing (MD): (ft) Daily Well: WX Date: Hole Size: Next Casing (TVD}: (ft) Cum. Welt: Elev Ref: DO UD FS/Target: 25.00//30.00 Geologist: KB Elev: 40.00 (ft) Engineer: Ken Allen Tot. Personnel: 48 Supervisor: Bordes / Newlon Program: Cost Ahead: 0 USD, Days Ahead: 0.00 Weather: Cold & Clear Current Status: Start Decomplete on NS33a 24hr Summary: Nipple up BOP's, Test BOP's, Pull TWC, Pull Tubing Hanger to floor 24hr Forecast: L/D 50 x 4 1/2" NSTC Tubing, Make Clean out run Comments: No Accidents, No Spills, No Incidents Weather: Temp -15 deg, Wind Chill - 34 deg, Wind Directi on W @ 8 mph, Gust 12 Visibility 19 miles HSE & Well Control Days Since Last DAFWC: 1927 All Free Days: 24 Last Csg Test Press.: (ps i) Last Envir. Incident: 2/17/2007 Last BOP Press. Test: Last Abandonment Drill: 1/23/2009 Next BOP Press. Test: Last Safety Meeting: 1/23/2009 Last Spill Drill: 1/23/2009 No. Stop Cards: 4 Regulatory Agency Insp: N Non-compliance Issued: N FIRE: 1/21/2009 MAN DOWN DRILL: 1/19/2009 Pump Slow Pump Rates (Girt) Slow Pump Rates (Choke) Slow Pump Rates (Kill) TVD: (ft) Stroke Rate Pressure() Stroke Rate Pressure() Stroke Rate Pressure() EMW: (PPg) MAASSP: (psi) Test Pressure: (psi) Kick Tolerance: (ppg) Kick Volume: (bbl) O erational Parameters ROP Daily: Rotating Weight: Daily Bit Hrs: (hr) Pum p Sta tus -Dril ling and Ri ser ROP Cum.: Pick Up Wt.: Daily Sliding Hrs:0.00 (hr) Pump Type Eff. Strokes Liner Size Circ. Rate WOB (min): Slack Off Wt.: Cum. Bit Hrs: () Q Q () WOB (max): Circ. Rate Riser: RPM Min.: Circ. Rate Hole: Ann. Vel. Riser: (ft/min) RPM DH: Circ. Off Bottom: Ann. Vel. DC: (ft/min) Torq. on Bottom: Circ. On Bottom: Ann. Vel. DP: (fUmin) Torq. off Bottom: Jar Hrs since Inspect: (hr) O erations Summar From-To Hrs Phase Task Activity Code NPT Operation Op. Depth (hr) 00:00-07:30 7.50 PRE BOPSU NU P PTSM, Nipple up BOP's, Riser, Turnbuckles, Flowline, Choke line and kill line -Cement Retainer @ 16,415' with 274 bbls of cement squeeze below and 39 bbls of cement on top of retainer, Top of Cement @ 16,243' Two Way Check plug with test dart in tubing hanger 07:30-08:30 1.00 PRE BOPSU NU P Rig up to Test -MU Test Jt. and Test Dart XO -Function Test rams -make up Surface Safety valves and Dart Valves 08:30-12:00 3.50 PRE BOPSU TSTPRS P Test BOP's -250 psi Low / 5000 psi High, -5 minutes each test, Chart Record Test -Test Witness by AOGCC, Chuck Scheve, BP WSL, Richard Bordes, NAD TP, Bill Bixby Printed: 1/25/2009 4:43:42 AM ~ • BP AMERICA Daily Operations Report Page 2 of 3 Operator: BP AMERICA Rig: NABOBS 33E Report: 25 Well: NS RIG 33E MAINTENANCE/MOBILIZATION Event: MOBILIZATION Date: 1/24/2009 Field: NORTHSTAR Well Type: DEVELOPMENT O eratons Summar From-To Hrs Phase Task Activity Code NPT Operation Op. Depth (hr) 12:00-17:00 5.00 PRE BOPSU TSTPRS P Test to 250 psi low/ 5000 psi high, test with 5" Test Joint. #1) Top Rams 4.5" x 7" VBR / Choke Valves # 9, 12 & 13 #2) Choke Valves # 8 & 11 #3) Choke Valves # 4, 7, & 10 #4) Super Choke /Manual Choke #5) Choke Valve # 3-5-6 /Manual Kill #6) Manual Choke Manifold Valve #1 #7) HCR Choke line valve, Dart Valve #8) Annular 250 psi / 3500 psi. #9) Lower Pipe 3.5 x 6" VBR /Upper IBOP #10) Manual Choke Valve, TDS TIW #11) Blind Shear Rams / #2 Choke Valve Kill Line Uni-Bolt flange connection failed and will be replaced Function Test Accumulator Draw Down - 1700 psi, 40 sec for 200 psi build up ,Full pressure @ 3 min 15 sec. 4 Nitrogen bottles at 2600 psi P/U 4.5" Test Jt and perform the follow -Test Upper Pipe Rams 250 psi / 5000 psi. -Test Annular to 250 psi / 5000 psi 17:00-18:30 1.50 PRE BOPSU TSTPRS P Rig Down BOP Test Equipment 18:30-20:30 2.00 PRE BOPSU ND P Rig up lubricator and ull TWC PJSM with Drill Site Maintenance -PU 2 7" x x17' Lubricator extensions and Lubricator -Set just below top set of pipe rams and close top set of Rams -Test to 500 si for 5 min. ood e -Pull TWC -Flow check well -Rig Down Lubricator and Extensions 20:30-00:00 3.50 PRE BOPSU PUL P Rig Up to Pull 4 1/2" NSCT tubing -Pump out stack -MU 2 joints of 5" Drill Pipe and 5 7/8 MCA XO to Hanger -M/U Top Drive -Back out Lock Down Screws -Unseat Hanger and pull to floor, PUW 70,000 Ibs, Block Wt. _ 45,000, String Wt 25,000 Ibs -Rig to Laydown Tubing Release rig to NS33A Personnel Company No. Hours Company No. Hours Company No. Hours ASRC ENERGY 2 FAIRWEATHER 1 NABOBS 3 NABOBS 24 QUADCO 8 M-I DRILLING FLUIDS 2 NABOBS 1 NABOBS 4 NABOBS 2 SCHLUMBERGER 1 Cumulative Phase Breakdown Planned Change of Scope Total Total Cost Phase Prod % Total NPT % Total WOW % Total Prod % Total NPT % Total WOW % Total Hours USD PRE 600.00 100.0% 600.00 1,559,509.0 TOTALS 600.00100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 600.00 1,559,509.0 Remarks PJSM or HACL perform prior to all jobs Daily derrick inspection performed. Flow line clearance: NS32 = 6.875" No Change Printed: 1/25/2009 4:43:42 AM BP AMERICA Daily Operations Report Page 3 of 3 Operator: BP AMERICA Rig: NABOBS 33E Report: 25 Well: NS RIG 33E MAINTENANCE/MOBILIZATION Event: MOBILIZATION Date: 1/24/2009 Field: NORTHSTAR Well Type: DEVELOPMENT Remarks NS34 =5.875 " No Change Day Crew Spill Drill Response time = 1 min 12 sec i x PTSM, i x PJSM, 2 x toolbox meetings / KSARS Night Crew Man Down Drill Response time = 1 min 35 sec i x PTSM, i x PJSM, 7 x toolbox meetings / KSARs Personnel on Island: 2 WSL 1 BP Engineer 2 Nabors Toolpusher 3 Nabors Support Personnel 1 Nabors Senior Electrician 4 Quadco 2 MI Mud Engineer 1 AIC Lead Nights 1 AIC Crane Op Nights 1 CCI Enviro2 Nights 1 ARCA Housekeeper 2 CanRig Techs 2 AIC Techs Island Totals = 25 Travel to Island by hovercraft /Tucker Personnel commuting daily from Chugach Camp; 25 Nabors hands, 4 Quadco, 1 FWX Logistics, 1 K&M - 31 total Ice Road Update:: Flooding road Ice road profiled average ice thickness 48.7" as of 1-15-2009 293 Jts of 5" S-135 19.5# NC-50 Drill Pipe in Pipe Shed -apx 9110' 207 Jts of 5" S-135 19.5# NC-50 Drill Pipe on Bench -apx 6520' Total- 500 jts 5" DP 17 Jts of 5" HWDP - 518' in Pipe Shed 23 Jts of 5" HWDP - 700' on Bench Total - 40 Jts 5" HWDP Printed: 1/25/2009 4:43:42 AM BP Operations Summary Report Legal Well Name: NS33 Page 1 of 18 Common W Event Nam Contractor Rig Name: Date ell Name: e: Name: ~ From - To NS33 REENTE NABOB NABOB ', Hours R+COM S ALAS S 33E ' Task PLET KA DRI Code E LLING NPT Start I Rig Rig Phase Spud Date: 1/29/2007 : 1/25/2009 End: Release: Number: Description of Operations 1/25/2009 00:00 - 00:01 0.02 BOPSU P PRE Pre-Rig charges 00:01 - 01:30 1.48 PULL P DECOMP Lay Down 19 Its. of 4 1/2" NSCT Tubing *Absorbant in Pin and Box end with Thread Protectors to prevent MOB mud from dripping on location 01:30 - 03:30 2.00 PULL N SFAL DECOMP Bolts on Top of elevators sheared when plate that held inserts was set down on top of tubing collar. -Repair Elevators with Replacement from NOC in Deadhorse 03:30 - 06:00 2.50 PULL P DECOMP Lay Down 31 jts. of 4 1/2" NSCT Tubing *Absorbant in Pin and Box end with Thread Protectors to prevent MOB mud from dripping on location 06:00 - 07:00 1.00 PULL P DECOMP Rig Down Tubing Handling equipment and clear floor of excess equipment. -Clean MOB off Floor 07:00 - 08:00 1.00 CLEAN P DECOMP Set Wear Bushing -10 13/16" ID 08:00 - 10:00 2.00 CLEAN P DECOMP Make u 10 5/8" used rock bit, Boot Basket, Float Sub, Full Gauge string mill, XO, 1 x 5" HWDP, Jars 10:00 - 11:30 1.50 CLEAN P DECOMP Reprogram Top Drive PLC Board 11:30 - 12:30 1.00 CLEAN P DECOMP Finish Picking 5" HWDP 1 x 1 -Total of 17 joints and jars 12:30 - 14:30 2.00 CLEAN P DECOMP Pick 5" S-135 19.5# Drill Pipe 1 x 1 14:30 - 16:00 1.50 CLEAN P DECOMP PJSM -Slip and Cut Drilling Line 16:00 - 19:00 3.00 CLEAN P DECOMP Pick 5" S-135 19.5# Drill Pipe 1 x 1 19:00 - 20:30 1.50 CLEAN P DECOMP CBU 3 x -PJSM -Break Circ slowly @ 200 gpm to establish flow -Stage up to 550 gpm / 980 psi 110 PUW / 100k Sow / 102k Mud wts fluctuated 7.8 to 8.2 ppg, very little barite in fluid 20:30 - 00:00 3.50 CLEAN P DECOMP Pick 5" S-135 19.5# Drill Pipe 1 x 1 -training Rig Personnel on CanRig Tq-Matic Wrench (T2) 1/26/2009 00:00 - 04:30 4.50 CLEAN P DECOMP Pick Up 5" S-135 19.5# Drill Pipe 1 x 1 to 7000' and - training Rig Personnel on CanRig Tq-Matic Wrench (T2) 04:30 - 07:30 3.00 CLEAN P DECOMP Circulate and Condition MOB Mud -CBU 3 x -Break Circ slowly to establish flow -Stage up to 650 gpm / 1980 psi -80 rpm / 6000 fUls Torque -Final circ rate 700 gpm / 1820 psi 120 rpm / 7000 ft/Ibs Torque 140 PUW / 100k SOW / 120k RtWt Mud wts fluctuated 7.9 to 10.5 ppg 07:30 - 09:00 1.50 CLEAN P DECOMP Pick Up 5" S-135 19.5# Drill Pipe 1 x 1 to 73 96' and ^ -Mud U-Tubing and flowing back out Drill Pipe 09:00 - 09:30 0.50 CLEAN P DECOMP Service TDS, Draw Works, Blocks & T2 -build weight pill 20 bbl 11.9 ppg pill -pump dry job to balance mud 09:30 - 16:30 7.00 CLEAN P DECOMP Pick Up 5" S-135 19.5# Drill Pipe 1 x 1 to 11000' and 16:30 - 21:00 4.50 CLEAN P DECOMP Circulate and Condition MOB Mud -CBU 3 x -Break Circ slowly to establish flow -650 gpm / 3280 psi Printed: 2/19/2009 11:22:16 AM • • BP Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 33E Date From - To !, Hours Task Code' NPT __ 1/26/2009 16:30 - 21:00 ~ 4.50 CLEAN P 21:00 - 22:00 I 1.001 CLEAN I P 22:00 - 00:00 I 2.00 I CLEAN I P 1/27/2009 00:00 - 06:30 6.50 CLEAN P 06:30 - 15:00 8.50 CLEAN P Start: 1 /25/2009 Rig Release: Rig Number: Page 2 of 18 Spud Date: 1 /29/2007 End: Phase Description of Operations DECOMP -120 rpm / 10,000 ft/Ibs Torque -Final Circ. Rate ~ 650 gpm / 2800 psi (circ. at max to keep mud in trough going to L Pit bypass) 182PUW/121kSOW/141kRtWt Mud wts fluctuated 9.1 to 11.9 ppg Metal shavings in cuttings during 1st bottoms up DECOMP Test KIII Line going to the BOP's -Test to 5000 psi with water, Good Test DECOMP Pick Up 5" S-135 19.5# Drill Pipe 1 x 1 to 12151' and -Rig Personnel on CanRig Tq-Matic Wrench (T2) DECOMP Pick Up 5" S-135 19.5# Drill Pipe 1 x 1, tagged at 16254' and DECOMP Circulate and Condition MOB Mud at 525 gpm / 4100 psi, limited out on highline power, warm up 399 cats -CBU 3 x -Break Circ slowly to establish flow -125 rpm / 19,000 fUlbs Torque -Final Circ. Rate at 600 gpm / 4030 psi (circ. at max to keep mud in trough going to L Pit bypass) 265 PUW / 100k SOW / 170k RtWt Mud wts fluctuated 9.8 ppg - 13.0 ppg 1st Btms Up -Shaker screens blanking off with 80% metal shavings, MW out 13.0 ppg, mud thinned out and returns Online with rig Gen 1 and 4 to assist highline power Second Btms Up -returns showed about 10% metal, MW out 9.8 ppg, 560 gpm / 3950 psi, 127 rpm Third Btms Up -returns showed about 10% metal, MW out 10.5 - 12.5 ppg, 600 gpm / 4200 psi, 127 rpm - hole clean. MW in /out 10.1 oog - 9.9 15:00 - 15:30 0.50 CLEAN P DECOMP Circ while holding PJSM with mud eng, rig and G and I personnel, reviewed operational procedure, assigned and discussed specific job assignments, checked valve alignments and established good communication 15:30 - 16:00 0.50 CLEAN P DECOMP Circ while walking through job assignments, empty trip tank to pits, preparing to displace well to seawater with 1 % safe tube 16:00 - 21:30 5.50 CLEAN P DECOMP Pump and emptied MOB mud from pits followed by OBM Spacer - 60 bbls LVT Base Oil Transition Spacer - 200 bbls water, 2 ppb Duovis, Weighted to 13.0 with bar, 5 drums Safe Solve OM (6%v/v), 3 drums Safe Surf O (this will change the filter cake to wet ability from oil to water wet) Surfactant Spacer - 195 bbls of water treated with 5 drums Safe Surf O (this cleans the well bore) Printed: 2/19/2009 11:22:16 AM • BP Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 33E Date From - To Hours Task CodetNPT --_ - _ I 1/27/2009 16:00 - 21:30 5.50 CLEAN P 21:30 - 00:00 I 2.501 CLEAN I P 11/28/2009 100:00 - 03:30 I 3.501 CLEAN I P 03:30 - 07:00 I 3.501 CLEAN I P 07:00 - 12:30 ~ 5.50 ~ CLEAN P 12:30 - 18:30 6.00 CLEAN P 18:30 - 00;00 I 5.501 CLEAN I P 1/29/2009 00:00 - 00:30 0.50 CLEAN P 00:30 - 01:00 0.50 CLEAN P 01:00 - 03:00 2.00 CLEAN P 03:00 - 03:30 0.50 CLEAN P 03:30 - 04:30 1.00 EVAL P 04:30 - 06:00 I 1.501 EVAL I P Start: 1 /25/2009 Rig Release: Rig Number: Page 3 of 18 ~ Spud Date: 1/29/2007 End: Phase Description of Operations DECOMP Viscous Spacer - 150 bbls water with 2 ppb Duovis Seawater displacement with 1 % Sate Lube @ reduced rate as not to overload G&I & drag chain. -300 gpm 1100 psi. -125 rpm, T019k -Up Wt 240k, Dn Wt. 140k, Rt Wt. 195k Torque increased to 26k, 17000 stokes into displacement, increased Safe Lube concentration to 2% to combat torque DECOMP -Clean seawater to surface ~ 29000 strokes, line up to active pits system and increase pump rate to 600 gpm 1970 psi. -Continue to circulate conditioning seawater to 2% Safe Lube concentration to surface. -Unable to rotate drill string without pipe movement. Suspend rotation. Mobilizing EP mud tube sweep. -Attempt to rotate drill string with 2% Safe Lube to surface, 26k TO with pipe movement, Unable to rotate without pipe movement. -Up Wt 240k, Dn Wt 140k DECOMP -Cont' circulating 600 gpm, 1930 psi without rotation while building 100 bbl EP mud tube sweep and cleaning trip tanks of MOBM. DECOMP -Pump 100 bbl viscous sweep with 10% EP Mud Lube C~ 585 gpm 1915 psi. Start rotation 75 rpm and reciprocation when sweep turned the corner. Sweep back to surface, shut down pumps, established drilling parameters at 16240', Up Wt 230k, Dn Wt 150k, Rot Wt 190k, 35rpm, 15K tq -Obtain SPR's SPR. #1) 2BPM= 80 PSI / 36PM= 135 PSI SPR. #2) 2BPM= 80 PSI / 36PM= 135 PSI MD= 16240' / Seawater Wt 8.5 ppg DECOMP -Monitor well, stable, POH for E-Line logs, recorded PU and SO readings every 1000' from 16,240' to 10,524. DECOMP -Secure well. Rig Team and Support personnel attend K&M ERD refresher class DECOMP -Cont' POH from 10,524' to 950' recording PU and SO readings every 1000' DECOMP -POH from 950' to BHA DECOMP -Stand back HWDP DECOMP -PJSM & LD BHA, Break bit, LD Jar, 2x HWDP, boot basket & gauge mill. Mill in full gauge. DECOMP -Clean & Clear rig floor of vendors tools DECOMP -PJSM & attem t to test 11-3/4" casin to 4200 si. Casin failed at 4000 osi and fell off instantly to 1000 osi then bled to 0 DECOMP -Check surface equipment. Test surface lines to 3800 psi. ~ leaks found on surface. Open well and monitor well bore, well ..~.. s... l'~~.-.,..IS ...:iL. A.....I............. l11'1 [- I. A.. L.:1:-... LJCC ~~ ~]/A ~~ 06:00 - 07:30 1.50 EVAL N SFAL DECOMP -Blow down surface equipment. 4" isolation valve in mezzanine leaked by causing rig floor manifold to freeze up. Thaw mud line and repair 4" valve & test same to 4000 psi. 07:30 - 09:00 1.50 EVAL P DECOMP -PJSM & attempt to re-test 11-3/4" casino Dumbed 71 strokes Printed: 2/19/2009 11:22:16 AM • gp Page 4 of 18 Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: REENTER+COMPLETE Start: 1/25/2009 End: Contractor Name: NABOBS ALAS KA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date From - To Hours ~ Task I Code NPT Phase. ' Description of Operations 1/29/2009 07:30 - 09:00 1.50 EVAL P DECOMP 711 si um in fluid awa .Monitored for 7 min, pressure bleed down from 711 psi to 295 psi. Test failed suspend test. Blow down lines. 09:00 - 11:00 2.00 EVAL P DECOMP -PJSM & spot SLB a-line unit & RU sheaves. Pick up USI logging tools and function test same. Test good. 11:00 - 21:00 10.00 EVAL P DECOMP -RIH with Run #1 USIT / GR / CCL to 15,550' MD and log out of hole to surface. 21:00 - 22:00 1.00 EVAL P DECOMP -PJSM / LD logging tools & RD SLB a-line. Clear rig floor of vendors tools. 22:00 - 23:30 1.50 EVAL P DECOMP -PJSM / PU & MU HES 11-3/4" RTTS tool and RIH with 5 stands 5" HWDP to 479'. Blow down kill line. 23:30 - 00:00 0.50 EVAL P DECOMP -RIH with RTTS on 5" DP from 479' to 1065' Losses from testing = Total losses = 43 bbl 1/30/2009 00:00 - 03:30 3.50 EVAL P 03:30 - 05:00 1.50 EVAL P 05:00 - 09:00 4.00 EVAL P 09:00 - 10:30 1.50 EVAL P 10:30 - 14:30 4.00 EVAL P 14:30 - 16:30 2.00 EVAL P 16:30 - 17:30 1.00 EVAL P 17:30 - 19:30 2.00 EVAL N DECOMP -RIH with RTTS on 5" DP from 1065' to 5070' DECOMP -PJSM & set RTTS @ 5060', RU & test 11-3/4" from above to 3025 si. 69 strokes. Held. -Line up and attempt to test from below. Pressure up to 800 psi. 75 strokes. & shut in. Bled down to: 1 Min 650 psi 2 Min 550 psi 3 Min 500 psi 4 Min 450 psi 5 Min 400 psi -Release RTTS tool, RD & Blow Down surface equipment. DECOMP -RIH from 5070' to 10049', Up Wt 172k, Dn Wt 118k, PU, set 11 3/4" RTTS at 10037' DECOMP -Pressure test 11 3/4" from above to 2975 psi, 125 strokes, Held, OK -Line up and attempt to test from below. Pressure up to 975 psi. 65 strokes and shut in. Bled down to: Shut in 975 psi 5 Min 450 psi -Release RTTS tool, RD & Blow Down surface equipment. DECOMP -RIH from 10049' - 15214', Up Wt 230k, Dn Wt 130k, PU, set 11 3/4" RTTS at 15203' DECOMP -Pressure test 11 3/4" from above to 3022 psi, 183 strokes, -Line up and attempt to test from below. Pressure up to 1040 psi. 45 strokes and shut in. Bled down to: Shut in 1040 psi 2 Min 600 psi -Release RTTS tool, RD & Blow Down surface equipment. DECOMP -POH with RTTS tool from 15,214 to 14,739' SFAL DECOMP -Top Drive rotary hose interference with pipe racking operations. -Held PJSM, Loosen top drive goose neck connection and turn hose to correct interference problems. Printed: 2/19/2009 11:22:16 AM • BP Operations Summary Report Page 5 of 18 Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: REENTER+COMPLETE Start: 1/25/2009 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date 'From - To ~ Hours Task Code I NPT ~~ Phase Description of Operations 1/30/2009 19:30 - 21:00 1.50 EVAL P DECOMP -POH from 14,739' to 13,111' 21:00 - 00:00 3.00 EVAL N SFAL DECOMP -Top Drive rotary hose turned again interfering with pipe racking operations. -PJSM and attempt to correct as before. Found gland nuts loosening at both ends. Remove rotary hose from standpipe and tighten gland nuts and set screws. 24 hr losses to well bore = 25 bbls seawater 1/31/2009 00:00 - 10:00 10.00 EVAL N SFAL DECOMP -PJSM & Cont' correcting deficiency on top drive rotary hose and re-install /secure same. Adjust rotary hose for tracking through derrick. Secure electrical and hydraulic together. -Thawing out seawater line between pipe-rack and rig 10:00 - 12:00 2.00 EVAL P DECOMP -POH from 13,111' to 10,446' -Parameters ~ 10,466' UP WT. 210k / DN WT. 110k - r uw ~eawttier wsses = i v uui~ 12:00 - 17:30 5.50 EVAL P DECOMP -POH from 10,446' to 479' 17:30 - 18:00 0.50 EVAL P DECOMP -Handle BHA Stand back 5 stands HWDP & LD RTTS tool. 18:00 - 19:00 1.00 BOPSU P DECOMP -MU ported sub on stand of 5" HWDP & flush BOP stack. Function all rams and repeat flushing BOP. LD ported sub & blow down top drive and mud lines. 19:00 - 21:00 2.00 BOPSU P DECOMP -MU running tool and pull wear bushing. -MU test plug to 5" test joint and RU test equipment. Fill BOP & choke manifold with 65 degree fresh water. 21:00 - 00:00 3.00 BOPSU P DECOMP Test BOPE as per BP / AOGCC Regulations to 250 psi low / 5000 psi High for 5 min each 250 psi / 3500 psi on Annular preventer. Witness of test waived by Bob Noble (AOGCC State Inspector). Witnessed by Chris Clemens (WSL), Kelly Cozby (NAD Toolpusher), Kenny Sullivan (NAD Drillers). Test as follows with 5" Test Joint. Test as follows with 250 psi / 5000 psi. #1) Top Rams 4.5" x 7" VBR / NC-50 IBOP /Choke Valves # 9, 12 & 13 /Kill Line #2) NC-50 Floor Safety Valve /Kill HCR /Choke Valves # 8 & 11 #3) Choke Valves # 4, 7, & 10 #4) Super Choke #5) Choke Valve # 3-5-6 /Manual Kill Line Valve #6) Manual Choke Manifold Valve #7) Choke Valve #1, 3 & 5 #8) Choke Valve #2 #9) Choke HCR Valve -Tour Seawater Losses = 8bbls -24 Hrs Losses = 18 bbls 2/1/2009 00:00 - 02:30 2.50 BOPSU P DECOMP -Cont' Test BOPE as per BP / AOGCC Regulations to 250 psi low / 5000 psi High for 5 min each 250 psi / 3500 psi on Annular preventer. Witness of test waived by Bob Noble (AOGCC State Inspector). Witnessed by Chris Clemens (WSL), Kelly Cozby (NAD Toolpusher), Kelly Haug (NAD Drillers). Printed: 2/19/2009 11:22:16 AM BP Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Event Name: REENTER+COMPLETE Start: Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 33E Rig Number: Date From - To Hours Task Code ~ NPT I Phase 2/1/2009 00:00 - 02:30 2.50 J - IBOPSUHP DECOMP 02:30 - 03:00 0.50 BOPSU P DECOMP 03:00 - 09:00 6.00 BOPSU N SFAL DECOMP 09:00 - 09:30 0.50 DHB P DECOMP 09:30 - 11:00 1.50 DHB P DECOMP 11:00 - 11:30 0.50 DHB N WAIT DECOMP 11:30 - 13:00 1.50 DHB P DECOMP 13:00 - 13:30 0.50 DHB P DECOMP 13:30 - 14:00 0.50 DHB P DECOMP 14:00 - 14:30 0.50 DHB P DECOMP 14:30 - 18:30 4.00 DHB P DECOMP 18:30 - 20:00 1.50 DHB P DECOMP 20:00 - 21:00 1.00 DHB P DECOMP 21:00 - 00:00 3.00 DHB P DECOMP 2/2/2009 00:00 - 05:30 5.50 DHB P DECOMP 05:30 - 08:30 3.00 DHB P DECOMP 08:30 - 10:30 2.00 DHB P DECOMP 10:30 - 12:00 1.50 DHB P DECOMP 1 /25/2009 Page 6 of 18 ~ Spud Date: 1 /29/2007 End: Description of Operations #10) Manual Choke Valve #11) Annular 250 psi / 3500 psi. #12) Bottom 3.5" x 6" VBR /Upper Top Drive Well Control Valve (UWCV Failed) #13) Bottom 3.5" x 6" VBR /Lower Top Drive Well Control Valve #14) Function /Draw Down Accumulator Test #15) Blind Shear Rams -Pull test plug, RD /Blow down test equipment. Install 10-15/16" ID Wear Bushing. RILDS -PJSM & Change out failed Top Drive Upper Well Control Valve. -RU & test Upper Well Control Valve to 250 psi / 5000 psi. Test good. RD test equipment. -PJSM with all involved personnel on operational proceedures for running 11 3/4" CIBP -Make dummy run with 11 3/4" CIBP running tool, open circ sub, MWD and 1 std of HWDP below wellhead to confirm running tool clearance, POH, std bk HWDP -Waiting on 4 1/2" float sub, wrong sub on location with 5 1/2" Reg pin instead of 4 1/2" IF pin -MU float sub to circ sub and MWD, install 11 3/4" CIBP to running tool, RIH with 5" HWDP to 500' -RIH with CIBP on 5" DP from-500' to 1074' C~ max 1 stand per stand -Shallow pulse test MWD C~ 450 gpm 230 psi. Good Test. -RIH from 1047' to 1745' -D-1 Drill, Secure well. Line up trip on trip tank and circulate across top of well. Station well control certified personnel to watch well & hold rig team morale meeting in drilling office. -PJSM /Slip & Cut 126' of drilling line. -Service Draw-works /Top Drive /Block & Crown. -RIH from 1745' to 7006' UP WT. 135k / DN WT 108k -24 Hrs Losses = 15 bbls -Total losses to well bore = 101 bbls. Seawater -RIH with CIBP from 7006' to 14,770' C~ max 1 min per stand. -Fill DP every 3000' UP WT. 220k / DN WT 130k -MU TDS & stage pumps up to 500 gpm 1050 psi. -RIH Logging C~3 300 fph from 14,770' to 15,129' UP WT. 220k / DN WT 135k -POH Logging C~3 300 fph from 15,129' to 14,997' -500 gpm 1050 psi. & determine CIBP setting depth. -Kill pumps and RIH placing top of CIBP C~ 15,065'. -PU drill string 5' to PU WT of 230k. S/O 2.5' -Engage Rotary and rotate 42 turns. -Pull to 240k and wait 2min. -Pull to 260k and wait 1 min. -Pull to 280k and wait 1 min. Printed: 2/1912009 11:22:16 AM gp Page 7 of 18 Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: REENTER+COMPLETE Start: 1/25/2009 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: .Date From - To ', Hours Task Code N'PT Phase Description of Operations 2/2/2009 10:30 - 12:00 1.50 DHB P DECOMP -Pull 295k & shear off of bridge plug & POH 30', RIH and taq to of CIBP @ 15,065' and SO 20k. POH 30' and rotate pipe 30 rounds to retract setting tool. -Close to set of rams and ressure test to 2000 si and hold for 5 min. Held -Bleed of pressure and Blow down lines. -12 Hrs Losses = 35 bbls -Total losses to well bore = 136 bbls. Seawater 12:00 - 15:30 3.50 DHB P' DECOMP -PJSM & displace well over to 9.2 ppg LSND millin fluid. -Pumped 55 bbl Hi is spacer followed by 1600 bbls 9,2 ppg -Pumping ~ 490 gpm / 960 psi / 33 rpm / 7k TO UP WT 212k / DN WT 148k / RT WT 175k 15:30 - 16:00 0.50 DHB P DECOMP -Cont' circulate and fill pits system and trip tank with new mud from G&I. -Obtain SPR's SPR. #1) 2BPM= 260 PSI / 3BPM= 310 PSI SPR. #2) 2BPM= 260 PSI / 3BPM= 310 PSI MD = 15040' / TVD = 6558' Mud Wt 9.2 ppg -Monitor well, Static. Pump Dry job & blow down TDS & mud line. 16:00 - 23:30 7.50 DHB P DECOMP -POH from 15,040' to 500' 23:30 - 00:00 0.50 DHB P DECOMP -POH stand back 5 stands HWDP & LD HES Setting tool. 2/3/2009 00:00 - 03:00 3.00 STWHIP P WEXIT -PJSM & MU 11-3/4" Whipstock BHA #4 / MU Starter Mill / Lower Mill /Flex Jt /Upper Mill / XO / 1 Jt. 5" HWDP /Flt Sub / MWD / UBHO Sub & Orient MWD to starter mill pin. -PU & MU whipstock slide to starter mill &RIH. PU Bumper Sub -RIH with 5 Stds 5" HWDP from Derrick. 03:00 - 04:00 1.00 STWHIP P WEXIT -RIH with whipstock on 5" drill pipe from 590' to 1057' 04:00 - 04:30 0.50 STWHIP P WEXIT -Shallow pulse test MWD tool, pump l~ 480 gpm / 360 psi. Good Test, Blow Dn Mud Lines. 04:30 - 17:30 13.00 STWHIP P WEXIT -RIH from 1057' to 14,945' -Fill DP every 3,000' run 17:30 - 18:30 1.00 STWHIP P WEXIT -MU TDS & establish parameters -Pump 503 gpm / 1070 psi / Up Wt. 220k / Dn Wt. 140k -Orient and set Baker Gen II 11-3/4" whipstock 42 degrees right of high side at 15,037' SO to 15,065 MD & tag CIBP with 20k set down weight & trip anchor. PU to 10k over Up Wt to 230k & confirm anchor set. S/O to 45k with no indication of shear. Pick up to confirm mills sheared from the whipstock , assembly, mills free. Establish rotation Rt Wt. 175k / 100 rpm / TO 10k. Shut down rotary. 18:30 - 19:00 0.50 STWHIP P WEXIT -Pump 100 bbl Lube pill surface to bit with 10% Steel Lube EP, t,.. 2.5% Low-Torque, 2.5% 776. - i win ow in - casing rom o , -TOW at 15,037' MD -BOW at 15,060' MD -RT WT 175 / PUW 220k /SOW 140k -710 gpm / 1720 psi -100 rpm / 12-16k TO. / 2-5k Wt on mill. Printed: 2/19/2009 11:22:16 AM c,y 1~- ~ ~ti~ _~...-- ~C~ 1`~ ~~ ~~~~ 1 ~,~ f~ ~ ~" } pia' ~~~~~ii ~~ v` ~ l~~ ~-"~. ~~~; J~ ._ BPXA WELL, DATA TR~INSIVIIT'TAL Enclosed are the materials listed below. If you have anv questions. please contact Joe Lastufka at (9071564-4091 Date: 02-25-2009 Transmittal Number: 93041 Delive Contents SW Name Date Contractor Run To De th Bottom Depth Descri tion -NS24 12-05-2008 SCH 12450 12490 PL ADVISOR NS24 12-05-2008 SCH CD-ROM - PL ADVISOR NS09 12-17-2008 SCH 1 13044 13339 MEMORY SBHPS LOG CD-ROM -MEMORY SBHPS NS09 12-17-2008 SCH LOG PRODUCTION PROFILE NS16A 02-12-2009 SCH 1 11150 11390 WITH DEFT AND GHOST CD-ROM -PRODUCTION PROFILE WITH DEFT AND NS16A 02-12-2009 SCH GHOST PRODUCTION PROFILE NS05 02-13-2009 SCH 1 13551 13860 WITH DEFT AND GHOST CD-ROM -PRODUCTION PROFILE WITH DEFT AND NS05 02-13-2009 SCH GHOST ULTRASONIC CEMENT/CORROSION NS33 01-29-2009 SCH 1 100 15550 EVALUATION CD-ROM -ULTRASONIC CEMENT/CORROSION NS33 01-29-2009 SCH EVALUATION NS34A 12-16-2008 SCH 1 16088 17108 MEMORY SBHPS LOG CD-ROM -MEMORY SBHPS NS34A 12-16-2008 SCH LOG STATIC TEMPERATURE/ NS18 02-16-2009 PDS PRESSURE SURVEY NS18 02-17-2009 PDS 1 16250 16851 CORRELATION LOG CD-ROM STATIC TEMPERATURE/PRESSURE SURVEY/CORRELATION NS18 02-17-2009 PDS LOG..:::".- ~' `" Please Sign nd turn one copy of this transmittal. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 • .~~ ~; ,~ °yq ~,~ ~ ~°-- 't ~ ,, t rte, f ~ ~ ~ -- ,~-~ j} {~-q'"' ~ ~- f/g¢ry f~ ¢ ~ ~ 9 1 `~ ~ ,'~~~~ 14' ~ P~ 6~S ~ ~ ~_,.J ~ ~`~ ~ L.f ALA$SA OIL A1~TD GAS CO1~T5ERQA'1`IO1~T COMl-IISSIOIQ Dan Kara Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Northstar Field, Northstar Oil Pool, NS33 Sundry Number: 308-401 Dear Mr. Kara: SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown., a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, ~~ Daniel T. Seamount, Jr. _ I ~ Chair DATED this ~~ `'~ day of November, 2008 Encl. ~~"~3~ nU ,. D STATE OF ALASKA ~ 0~ ~ t ` ~, ~ ALASKA OIL AND GAS CONSERVATION COMM SION ~ ~ " ~ l '~:; ~ 4 0~ ~CC~ ~: V~ ``,~ APPLICATION FOR SUNDRY APPROVAL ~ 20 AAC 25.280 1. Type of Request: ®Abandon ~ ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Extension ^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ®Re-Enter Suspended Well ^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ®Development ^ Exploratory 206-138 - 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-23325-00-00 - 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: NS33 - Spacing Exception Required? ^ Yes ®No 9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s): °C'~~S~GC ~ic~`~ ADL 312798 56.6'' Northstar`t~it, ~'~\ 12• PRESENT WELL CONDITION SUM MARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 23460 9450 16415 - 7007 - None None 'n i M D B rs II tru r 1 r 4" ' rf 1 447 ' 4 1 10 n rm i 1' 11- /4" 1 7 441 i 'ner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): None None (Kill strip ) 4-1/2", 12.6# L-80 2142' Packers and SSSV Type: Packers and SSSV MD (ft): 13. Attachments: 14. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Exploratory ®Development ^ Service ^ Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencin O erations: January 1, 2009 ^ Oil ^ Gas ^ Plugged ®Abandoned 17. Verbal Approval: Date: ^ WAG ^ GINJ ^ WINJ ^ WDSPL Commission Representative: 18. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Ken Allen, 564-4366 Printed Name Dan Kara Title Engineering Team Leader Prepared By Name/Number. Signature `-- ~1--~-- Phone 564-5803 Date Itf 03 O~J Sondra Stewman, 564-4750 Commission Use Onl Sundry Number: ~_ '~~ Conditions of approval: Notify Commission so that a representative may witness ^ Plug Integrity ~I.BOP Test ^ Mechanical Integ ity Test ^ Location Clearance r Other: L ~i l ~~ ~ -~ S ~ ~ ~. ~-~~i S \ S ~~ ~ ~S ~ ~ ~ ~.`~ ~\ F C~, ~-~Cc S~caS~r~ i ~ ~- '~~1 ~ ~~ ~rj E '~ i~ ~eS SC~ . PC'8~ ~ CJ~C O~~i~ Subsequent Form Required: C~fl ~ ~E APPROVED BY 000 p ~ A roved B : COMMISSIONER THE COMMISSION Date Form 10-403 Revised 06/2006 ~ ~3F~. r~C~U ~ r° 2QDB Submit In Duplicate 1 Pre-Riq Work: 1. Pressure test T X IA to 4,200 psi for 30 minutes. Pressure test the OA to 2,000 psi for minutes. 2. Bleed OA, IA & TBG to zero. Test the 11-3/4" pack-off to 2,300 psi and tubing hanger seals to 5,000 psi. Function all lock-down screws. Repair or replace as needed. 3. Bleed casing and annulus pressures to zero. Set a BPV in tubing hanger. Secure well. 4. Remove the well house. Level the pad. Please provide total well preparation cost on the handoverform. Riq Operations: 1. MIRU Nabors 33E 2. Pull BPV. Circulate out freeze protection (OBM) and displace well to seawater. Monitor OA, IA and T for pressure to verify well is dead. Set TWC. 3. Test all down hole barriers: a. CMIT T x IA: 2,500 psi for 30 minutes. b. MIT OA: 2,000 psi for 30 minutes. 4. Nipple down tree. Nipple up and test BOPE (250/5000 psi, Hydrill 3500psi). Pull TWC. 5. Pull and lay down 4-1/2" tubing hanger. Pull and lay down 50 jts 4-1/2" 12.6# L-80 NSCT tubing along with pups, XN Nipple and WLEG from 2,142' MD. 6. PU 10-5/8" OD junk mill, 10-5/8" Watermelon mill and boot baskets. RIH picking up of 5" DP to PBTD (-16,243') and tag TOC. Displace well to seawater and CBU a minimum 3x pumping >_700 gpm. POOH racking back DP for logging run. 7. Pressure Test the 11-3/4" Casing to 4,200 psi for 30 minutes. Record test. 8. RU & Run oriented USIT/CBL CCL w/GR to 16,000' on DP. 9. PU HES EZSV with MWD/GR on DP. Correlate GR with previous GR/CCL run to set bridge plug 15,000' MD, as required to avoid cutting a casing collar while milling the window. POOH. 10. PU and RIH with 11-3/4" Baker bottom-trip anchor whip stock assembly on 5" DP. Orient whip stock, as desired, and set on bridge plug. Shear off of whip stock. 11. Displace the well to 9.2 ppg LSND based milling fluid. Completely displace the well prior to beginning milling operations. 12. Mill window in 11-3/4" casing at ±15,000' MD, plus 20' beyond middle of window. Circulate well bore clean. The remainder of the drilling procedure outline will be sent along with a new Permit to Drill application. Estimated Pre-Rig Start: 01/01/08 Estimated Spud Date: 01/15/08 Ken Allen Operations Drilling Engineer 907.564.4366 NS33 Application for Sundry Version 2.0 Pre-Rig Work: 1. Pressure test IA to 4,200 psi for 30 minutes. Pressure test the OA to 2,000 psi for minutes. 2. Bleed OA, IA & G to zero. Test the 11-3/4" pack-off to 2,300 psi and tubing hanger seals to 5,000 psi. Functio II lock-down screws. Repair or replace as needed. 3. Bleed casing and a ulus pressures to zero. Set a BPV in tubing hanger. Secure well. 4. Remove the well hou .Level the pad. Please provide total well preparation cost on the handoverform. Rig Operations: 1. MIRU Nabors 33E 2. Pull BPV. Circulate out fre a protection (OBM) and displace well t seawater. Monitor OA, IA and T for pressure to verif ell is dead. Set TWC. ,~~~? 3. Test all down hole barriers: i 1 •~ ~~/ " a. CMIT T x IA: 2,500 psi 30 minutes. b. MIT OA: 2,000 psi for 30 inutes. 4. Nipple down tree. Nipple up and t t BOPE (250/5000 psi, Hydrill 3500psi). Pull TWC. ~~ 5. Pull and lay down 4-1/2" tubing h er. Pull and lay down 50 jts 4-1/2" 12.6# L-80 NSCT tubing along with pups, XN Nipple an WLEG from 2,142' MD. 6. Test BOPE (Finish testing Bottom Ra ) 7. PU 10-5/8" OD junk mill, 10-5/8" Water elon mill and boot baskets. RIH picking up of 5" DP to PBTD (16,243') and tag TOC. Displa well to seawater and CBU a minimum 3x pumping ?700 gpm. POOH racking back DP for log g run. 8. Pressure Test the 11-3/4" Casing to 4,200 'for 30 minutes. Record test. 9. RU & Run oriented USIT/CBL CCL w/GR to 6,000' on DP. 10. PU HES EZSV with MWD/GR on DP. Correia GR with previous GR/CCL run to set bridge plug 15,000' MD, as required to avoid cutti a casing collar while milling the window. POOH. 11. PU and RIH with 11-3/4" Baker bottom-trip anc r whip stock assembly on 5" DP. Orient whip stock, as desired, and set on bridge plug. She off of whip stock. 12. Displace the well to 9.2 ppg LSND based milling flu .Completely displace the well prior to beginning milling operations. 13. Mill window in 11-3/4" casing at ±15,000' MD, plus 20 eyond middle of window. Circulate well bore clean. The remainder of the drilling procedure outline will be sent 'bong with a new Permit to Drill application. Estimated Pre-Rig Start: Estimated Spud Date: Ken Allen Operations Drilling Engineer 907.564.4366 01 /01 /08 01 /15/08 NS33 Application for Sundry r ~ by M" To: Tom Maunder - AOGCC Date: October 30, 2008 From: Ken Allen - BP ACT Rotary Drilling Subject: NS33 Application for Sundry Approval - P&A for Sidetrack Operations Approval is requested for the proposed P&A of Northstar well NS33. This conventional well is currently suspended due to hole stability problems encountered above the reservoir in 2007. The well never drilled to the production zone and is providing zero production or value to the field as it currently sits. In April 2007 hole stability problems were encountered while drilling in the Colville formation on NS33. The open hole below the 11-3/4" casing shoe was never fully stabilized while drilling or in subsequent clean out runs. An inadvertent sidetrack was also performed while attempting to drill this section to TD. An attempt was made to run a liner string over this unstable interval, but it was not possible to run it farther than 500' past the current 11-3/4" casing shoe. The liner was then pulled out of the hole and further clean out runs were attempted, but deteriorating hole conditions along with seasonal drilling restriction forced a suspension of the well bore. The plan is to abandon the lower portion of the 11-3/4" casing that has been previously plugged and abandoned through an EZSV Cement Retainer set at 16,415' MD. 274 BBLS of Cement was squeezed below the retainer and 39 BBLS was placed on top of the retainer. Two schematics and an operations summary have been attached to assist in explaining the previous and proposed work for this Sundry application. The proposed new sidetrack will target the Ivishak formation while attempting to drill around the previous problem area. A new Permit to Drill Application will be submitted in the near future designating the new well bore as NS33A. The NS33A sidetrack is currently scheduled for Nabors 33E beginning around 01/15/08. The pre- rig work for this sidetrack will be priority scheduled immediately after the Application for Sundry is approved. NS33 Application for Sundry TREE=ABB-VGIS 1/8" 5k 'WELLHEAD =ABB-VGI 13 5/8" ACTUATOR = KB. ELEV = 56.6 BF. ELEV = KOP = 300 Max Angle = 73 @ 12743' Datum MD = Datum N D = 16" CSG, 84#, HCL-80, BTC, ID=15.010" ~ N S 3 3 S OTES: Est CMT Top -16,243' Current 4.5" 12.6# L-80, NSCT Tbg, .0152 bpf 2121 4.5" HES "XN" Nipple 9Cr, ID = 3.725" 2142 4.5" WLEG I 4472' I Minimum ID = 3.725" @ 2121' JEWELRYTYPE,XN Nipple Estimated 10 5/8" CSG PBTD 16243' 39 BBLS placed on top of Retainer CBU performed at 16,243` in green cmt \ s _ ,; 11 3/4" HES EZSV Cement Retainer 16415' ~ .e" - 563. ID = 10.772" H 16491' 274 BBLS Squeezed below Retainer \ . ~~ °' ~ y --2,431 feet equivalent within \ ° • ~ ° 10-5/8" hole or -•18,846` MD ~ • ', 16,940` Tight Hole \e C Estimated 18,846` MD Bottom of Cement ' " ` NS33 KOP - 21,828' NS33P61 - 23,236' \ NS33 - 23,460' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNff 10/22/08 KWA SUSPENDED (NS33) WELL: NS-33 PERMfr No: 206-138 AR No: 50-029-23325-00-00 SEC:11, T13N, R13E, 1369' FSL, 650' FEL BP Exploration (Alaska) TR~~=A66-VGI51/8" 5k ELLHEAD =A66-VGI 13 5/8" ACTUATOR = KB. ELEV = 56.6 BF. ELEV = KOP = 300 Max Angle = 73 @ 12743' Datum MD = Datum TV D = NS33 Proposed P&A 16" CSG, 84#, HCL-80, BTC, ID=15.010" H 4472' 11 3/4" Whipstock -15050 11 3/4" HES EZSV -15076 Estimated 10 5/8" CSG PBTD 16243' 39 BBLS placed on top of Retainer CBU performed at 16,243` in green cement ~ .~ , ~' s 11 3/4" HES EZSV Cement Retainer 16415' ~' 11 3/4" Csg, 60# S-95, Hydril 563. ID = 10.772" 16491' 274 BBLS Squeezed below Retainer \~ , " • ~ I -2,431 feet equivalent within \ ° • ~• 10-5/8" hole or --18,846` MD ••-r ~ 16,940` Tight Hole \ . • • ~ ~. . ;~ r• Estimated 18,846' MD Bottom of Cement ~ • ~ `-} ~ ~ ~ ~~~ ~ ° . • • •_ •.~• NS33 KOP - 21,828' NS33PB1 - 23,236' \ NS33 - 23,460' DATE REV BY COMMENTS DATE REV BY COMMENTS 10/22/08 KWA SUSPENDED (NS33) 10/30/08 KWA NS33 Proposed P&A PRUDHOE BAY UNfr WELL: NS-33 PERMfr No: 206-138 API No: 50-029-23325-00-00 SEC:11, T13N, R13E, 1369' FSL, 650' FEL BP Exploration (Alaska) Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Monday, November 10, 2008 2:02 PM To: 'Allen, Kenneth W Cc: Kara, Danny T; Stewman, Sondra D Subject: RE: NS33 (206-138) Ken, Your email wilt work fine. I'll include the updated pages. Tom Page 1 of 2 From: Allen, Kenneth W [mailto:Kenneth.Allen@bp.com] Sent: Monday, November 10, 2008 1:58 PM To: Maunder, Thomas E (DOA) Cc: Kara, Danny T; Stewman, Sondra D Subject: RE: NS33 (206-138) Tom, 1 have been able to confirm that we should be able to test the lower rams before pulling the kill string. I have updated the Summary of operations in the attached document (Version 2.0). If this is acceptable I would like to update your package with the following document. The only change from your current package is deleting the step "finishing testing the lower rams". All rams should be able to be tested before pulling the Kill Sting. You are correct about the BOPE test to 5000 psi. I have the test documented as "Nipple up and test BOPE (250/5000 psi, Hydrill 3500psi)". Please let me know if this is acceptable or you prefer Sondra to send over a new package hardcopy. Thank you, Ken Allen Drilling Engineer Northstar Mobile: 907.748.3907 Office: 907.564.4366 e-mail: Kenneth.Allen@BP.com From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Friday, November 07, 2008 2:54 PM To: Allen, Kenneth W Cc: Kara, Danny T Subject: NS33 (206-138) Ken, I am reviewing the sundry to re-enter this suspended well and effect the abandonment. You have included a step to test the lower pipe rams after pulling the kill string. I believe the MASP for Northstar wells is > 3000 psi and note that you plan to test the BOP to 5000 psi. Does the same height conflict exist under the lower pipe rams as with the rigs at Prudhoe? I am sort of surprised that there would be such a conflict at Northstar since Nabors 33E drilled all the wells. NOT testing the lower pipe rams may be acceptable for starting operations on this well provided the prior plugging operations are determined competent. I took forward to your reply. Tom Maunder, PE 11/10/2008 by BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. ~. ~o~,j5~ If you have anv questions. nlease contact Joe Lastufka at (9071564-4091 Date 08-25-2008 Transmittal Number:92993 Deliver Contents SW Name Date Contractor Run To De th Bottom De th Descri tion NS16A 07-26-2008 SCH 1 14150 14376 PERFORATING RECORD NS16A 07-26.-2008 SCH CD-ROM -PERFORATING RECORD NS33PB1 04-20-2007 SCH 1 0 23236 SURVEY REPORT NS33P61 04-20-2007 SCH DISKETTE -SURVEY REPORT NS33PB2 04-23-2007 SCH 1 0 23460 SURVEY REPORT NS33PB2 04-23-2007 SCH DISKETTE -SURVEY REPORT i~ l ^ J ~,~ ~ ;~- Please Sign and Return on copy of this transmittal. Thank You, Joe Lastufka Petrotechnical Data Center BPXA a OCo- ~~ ( ~` /6b33 AOGCC Murphy Exploration DNR MMS Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 SEP p ~ "ZQ~'r David Fair Christine Mahnken Ignacio Herrera Kristin Dirks Doug Chromanski I~~~ri.~~.,.~s ~..oc~-t3$ Date 07-10-2008 Transmittal Number:92984 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. If you have anv questions, please contact Joe Lastufka at (9071564-4091 Delive Contents SW Name Date Contractor Run To De th Bottom De th Descri tion NS16A 06-12-2008 SCH 1 14150 14350 PERFORATING RECORD NS16A 06-12-2008 SCH 1 14150 14350 CD-ROM -PERFORATING RECORD NS33 02-11-2007 GYRODATA 1 0 4400 SURVEY REPORT NS33 02-11-20 7 GYRODATA 1 0 4400 CD-ROM -SURVEY REPORT i ,~ ,; l '~ Please Sign an t n copy of this transmittal. Thank You, Joe Lastufka Petrotechnical Data Center BPXA AOGCC Murphy Exploration DNR MMS ~~ ~UL~U~~IC~'3 ~}~sk~~ t~ii %as Cons ;~nchoracaF David Fair Christine Mahnken Ignacio Herrera Kristin Dirks Doug Chromanski Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 gyrodata Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston. Texas 77043 713/461-3146 Fax: 713/461-0920 June 16, 2008 Joseph Lastufka BP Exploration (Alaska) Inc. 900 E. Benson Blvd. Petrotechnical Data Center, LR2-1 Anchorage, Alaska 99508 Re: Northstar, Well #NS33 Prudhoe Bay, Alaska Enclosed, please find five (5) copies and four (4) disks of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, %~" ~~, Rob Shoup North American Regional Manager RS: ki Serving the NJorldvdide Energy Ind~~st~y with Precis+nn S:1r~?~)' ins gyro ata Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713/461-3146 Fax: 713/461-0920 SURVEY REPORT BP Northstar #NS33 Nabors #33E Prudhoe Bay, Alaska AK0207G_506 11 Feb 2007 Serving the VVoridwide Energy Industry with Pr~cisicn Stiarvey ir,~ - ~ , . 'ati>>s? ~o~.- t~ 8 A Gyrodata Directional Survey for BP ALASKA Location: NABORS 33-E, N.S. BOROUGH, Lease: NORTHSTAR Well: NS33, 16" CASING Job Number: AK0207G 506 Run Date: 4/3/2007 4:00:01 PM Surveyor: HENRY DREW Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.491624 deg. N Longitude: 148.693344 deg. W Azimuth Correction: Gyro: Bearings are Relative to True North Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Well Head Location A Gyrodata Directional Survey BP ALASKA Location: NABORS 33-E, N.S. BOROUGH Lease: NORTHSTAR Well: NS33, 16" CASING Job Number: AK0207G 506 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.00 N 0.00 E ---------------------------------------------------------------------------------------------------- 0 - 4400 FT. RATE CONTINUOUS MULTISHOT SURVEY RUN INSIDE 16" CASING ALL MEASURED DEPTHS AND COORDINATES REFERENCED TO NABORS RIG 33-E RKB 100.00 0.90 28.62 0.90 100.00 0.8 28.6 0.69 N 0.37 E 200.00 0.60 12.00 0.37 199.99 2.1 24.5 1.88 N 0.86 E 300.00 2.13 302.23 2.00 299.96 3.4 349.8 3.38 N 0.61 W 400.00 4.01 292.99 i.94 399.81 7.9 316.8 5.74N 5.40W 500.00 6.28 301.90 2.40 499.41 16.6 307.0 9.99 N 13.26W 600.00 9.46 304.48 3.20 598.45 30.3 305.4 17.54 N 24.67W 700.00 10.38 306.61 1.00 696.96 47.5 305.5 27.56N 38.68W 800.00 10.92 314.27 1.51 795.24 65.9 306.9 39.55 N 52.69W 900.00 14.15 311.82 3.27 892.84 87.5 308.4 54.31 N 68.58W 920.00 14.71 311.73 2.80 912.21 92.5 308.6 57.63 N 72.30W 940.00 15.69 311.29 4.95 931.51 97.7 308.7 61.10 N 76.22W 960.00 16.14 310.86 2.31 950.75 103.2 308.8 64.70 N 80.36W 980.00 16.44 310.70 1.52 969.94 108.8 308.9 68.37 N 84.60W 1000.00 16.65 310.12 1.34 989.12 114.5 309.0 72.06 N 88.94W A Gyrodata Directional Survey BP ALASKA Location: NABORS 33-E, N.S. BOROUGH Lease: NORTHSTAR Well: NS33, 16" CASING Job Number: AK0207G 506 MEASU-RED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 1020.00 16.91 309.91 1.34 1008.27 120.2 309.1 75.77 N 93.36W 1040.00 17.18 309.49 1.48 1027.39 126.1 309.1 79.52 N 97.87W 1060.00 17.72 309.35 2.69 1046.47 132.1 309.1 83.32 N 102.51 W 1080.00 18.39 309.32 3.37 1065.48 138.3 309.1 87.25 N 107.30W 1100.00 18.94 308.67 2.91 1084.43 144.7 309.1 91.28 N 112.28W 1120.00 19.28 307.95 2.10 1103.33 151.2 309.1 95.34N 117.41W 1140.00 19.71 307.55 2.22 1122.18 157.9 309.0 99.42 N 122.69W 1160.00 19.88 307.30 0.97 1141.00 164.7 309.0 103.54 N 128.07W 1180.00 20.02 307.18 0.74 1159.80 171.5 308.9 107.67 N 133.SOW 1200.00 19.55 307.19 2.36 1178.62 178.3 308.8 111.76 N 138.90W 1220.00 19.05 307.26 Z.50 1197.49 184.9 308.8 115.76 N 144.16W 1240.00 18.58 307.41 2.35 1216.43 191.3 308.7 119.67 N 149.29W 1260.00 18.14 307.46 2.19 1235.41 197.6 308.7 123.50 N 154.29W 1280.00 17.91 307.63 1.19 1254.43 203.8 308.6 127.27 N 159.20W 1300.00 17.85 307.55 0.35 1273.46 210.0 308.6 131.02 N 164.06W 1320.00 17.65 307.91 1.10 1292.51 216.1 308.6 134.75 N 168.89W 1340.00 17.62 308.30 0.62 1311.57 222.1 308.6 138.49 N 173.65W 1360.00 17.58 308.91 0.94 1330.63 228.2 308.6 142.26 N 178.38W ~J A Gyrodata Directional Survey BP ALASKA Location: NABORS 33-E, N.S. BOROUGH Lease: NORTHSTAR Well: NS33, 16" CASING Job Number: AK0207G 506 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 1380.00 17.63 309.00 0.32 1349.70 234.2 308.6 146.06 N 183.08W 1400.00 17.83 309.42 1.15 1368.75 240.3 308.6 149.91 N 187.80W 1420.00 18.03 309.67 1.07 1387.77 246.5 308.6 153.83 N 192.SSW 1440.00 18.51 309.68 2.44 1406.77 252.7 308.6 157.84 N 197.37W 1460.00 18.81 309.27 1.63 1425.71 259.1 308.7 161.91 N 202.32W 1480.00 19.29 308.73 2.55 1444.62 265.7 308.7 166.01 N 207.39W 1500.00 19.72 307.65 2.79 1463.47 272.3 308.7 170.14 N 212.64W 1520.00 20.20 306.31 3.33 1482.27 279.2 308.6 174.25 N 218.09W 1540.00 21.03 303.72 6.16 1500.99 286.2 308.5 178.28 N 223.86W 1560.00 21.86 301.43 5.88 1519.60 293.5 308.4 182.22 N 230.02W 1580.00 22.77 299.88 5.42 1538.11 301.0 308.2 186.09 N 236.56W 1600.00 23.13 298.72 2.89 1556.52 308.7 308.0 189.90 N 243.36W 1620.00 23.79 298.27 3.43 1574.87 316.5 307.7 193.70N 250.35W 1640.00 24.14 298.12 1.79 1593.15 324.6 307.5 197.54 N 257.51 W 1660.00 24.79 298.47 3.31 1611.35 332.7 307.3 201.47 N 264.81 W 1680.00 25.34 298.99 2.95 1629.47 341.1 307.1 205.54 N 272.24W 1700.00 25.95 299.31 3.15 1647.50 349.7 306.9 209.76 N 279.80W 1720.00 26.72 300.14 4.28 1665.42 358.5 306.7 214.16 N 287.SOW A Gyrodata Directional Survey BP ALASKA Location: NABORS 33-E, N.S. BOROUGH Lease: NORTHSTAR Well: NS33, 16" CASING Job Number: AK0207G 506 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 1740.00 26.97 300.89 2.08 1683.26 367.5 306.5. 218.74 N 295.28W 1760.00 27.50 301.42 2.95 1701.05 376.6 306.4 223.48 N 303.11 W 1780.00 27.94 301.87 2.41 1718.75 385.9 306.3 228.36N 311.03W 1800.00 28.30 302.25 2.04 1736.39 395.3 306.2 233.37 N 319.02W 1820.00 28.65 302.69 2.02 1753.97 404.8 306.1 238.49 N 327.07W 1840.00 28.92 302.66 1.35 1771.50 414.4 306.0 243.68 N 335.17W 1860.00 29.43 302.90 2.59 1788.96 424.1 305.9 248.96 N 343.37W 1880.00 29.80 303.29 2.11 1806.35 434.0 305.9 254.36 N 351.65W 1900.00 30.23 303.53 2.22 1823.67 444.0 305.8 259.87 N 360.OOW 1920.00 31.00 303.28 3.89 1840.88 454.2 305.8 265.48 N 368.SOW 1940.00 31.44 303.34 2.20 1857.98 464.5 305.7 271.17 N 377.17W 1960.00 31.62 303.43 0.95 1875.03 475.0 305.7 276.93 N 385.90W 1980.00 3.1.88 303.77 1.55 1892.04 485.5 305.6 282.75 N 394.66W 2000.00 32.38 303.72 2.51 1908.98 496.1 305.6 288.66 N 403.51 W 2020.00 32.59 303.92 1.17 1925.85 506.9 305.5 294.64N 412.43W 2040.00 33.01 304.30 2.34 1942.66 517.7 305.5 300.71 N 421.40W 2060.00 32.81 304.74 1.58 1959.45 528.6 305.5 306.87N 430.35W 2080.00 32.96 304.84 0.80 1976.24 539.4 305.5 313.07 N 439.27W 2100.00 33.57 304.75 3.09 1992.97 550.4 305.5 319.33 N 448.28W A Gyrodata Directional Survey BP ALASKA Location: NABORS 33-E, N.S. BOROUGH Lease: NORTHSTAR Well: NS33, 16" CASING Job Number: AK0207G 506 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 2120.00 33.95 304.75 1.91 2009.59 561.5 305.4 325.66 N 457.41 W 2140.00 34.58 304.69 3.15 2026.12 572.8 305.4 332.07 N 466.67W 2160.00 34.68 304.58 0.57 2042.58 584.1 305.4 338.53 N 476.02W 2180.00 35.25 304.80 2.93 2058.97 595.6 305.4 345.06 N 485.44W 2200.00 35.75 304.84 2.51 2075.25 607.2 305.4 351.69 N 494.98W 2220.00 36.31 304.45 3.00 2091.43 619.0 305.4 358.38 N 504.66W 2240.00 36.91 304.44 3.01 2107.48 630.9 305.4 365.12 N 514.49W 2260.00 37.49 304.58 2.96 2123.41 643.0 305.3 371.97 N 524.46W 2280.00 38.16 304.31 3.43 2139.21 655.2 305.3 378.91 N 534.57W 2300.00 38.88 304.13 3.63 2154.86 667.7 305.3 385.91 N 544.87W 2320.00 39.21 303.93 1.79 2170.39 680.3 305.3 392.97 N 555.31 W 2340.00 39.90 303.64 3.59 2185.81 693.0 305.3 400.05 N 565.90W 2360.00 40.29 303.62 1.94 2201.11 705.9 305.2 407.18 N 576.62W 2380.00 41.15 303.57 4.27 2216.27 718.9 305.2 414.40 N 587.49W 2400.00 41.96 303.54 4.08 2231.23 732.2 305.2 421.74 N 598.54W 2420.00 42.46 303.63 2.49 2246.05 745.6 305.1 429.17 N 609.74W 2440.00 43.06 303.35 3.16 2260.73 759.2 305.1 436.66 N 621.06W 2460.00 43.22 303.39 0.82 2275.33 772.9 305.1 444.18 N 632.48W ~" A Gyrodata Directional Survey BP ALASKA Location: NABORS 33-E, N.S. BOROUGH Lease: NORTHSTAR Well: NS33, 16" CASING Job Number. AK0207G 506 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 2480.00 43.72 303.54 2.55 2289.84. 786.6 305.1 451.77 N 643.96W 2500.00 43.83 303.67 0.74 2304.28 800.5 305.0 459.43 N 655.48W 2520.00 44.10 303.49 1.47 2318.68 814.3 305.0 467.11 N 667.OSW 2540.00 44.18 303.41 0.51 2333.03 828.3 305.0 474.79 N 678.67W 2560.00 44.53 303.49 1.77 2347.33 842.2 305.0 482.49 N 690.34W 2580.00 44.92 303.37 1.98 2361.54 856.3 304.9 490.25 N 702.08W 2600.00 45.10 303.51 1.02 2375.68 870.4 304.9 498.04 N 713.89W 2620.00 45.81 303.59 3.58 2389.71 884.7 304.9 505.92 N 725.77W 2640.00 46.21 303.46 2.03 2403.60 899.1 304.9 513.87 N 737.76W 2660.00 46.72 303.64 2.68 2417.38 913.6 304.8 521.88 N 749.85W 2680.00 47.19 303.70 2.34 2431.03 928.2 304.8 529.98 N 762.01 W 2700.00 47.50 303.86 1.65 2444.58 942.9 304.8 538.16 N 774.24W 2720.00 48.55 303.78 5.27 2457.96 957.8 304.8 546.43 N 786.59W 2740.00 49.21 303.76 3.29 2471.11 972.8 304.8 554.81 N 799.11 W 2760.00 49.83 303.91 3.14 2484.09 988.0 304.8 563.28 N 811.75W 2780.00 50.46 303.99 3.18 2496.91 1003.4 304.7 571.85 N 824.49W 2800.00 50.86 .304.00 2.02 2509.59 1018.9 304.7 580.50 N 837.31 W 2820.00 51.40 304.19 2.79 2522.14 1034.4 304.7 589.23 N 850.20W A Gyrodata Directional Survey BP ALASKA Location: NABORS 33-E, N.S. BOROUGH Lease: NORTHSTAR Well: NS33, 16" CASING Job Number: AK0207G 506 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COOR DINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 2840.00 51.70 304.20 1.50 2534.57 1050.1 304.7 598.03 N 863.16W 2860.00 52.36 304.28 3.32 2546.88 1065.9 304.7 606.91 N 876.19W 2880.00 53.00 304.42 3.25 2559.00 1081.8 304.7 615.88 N 889.33W 2900.00 53.88 304.46 4.38 2570.92 1097.8 304.7 624.97 N 902.57W 2920.00 54.48 304.73 3.19 2582.62 1114.0 304.7 634.17 N 915.92W 2940.00 54.94 304.69 2.29 2594.18 1130.4 304.7 643.47 N 929.34W 2960.00 55.71 304.79 3.91 2605.55 1146.8 304.7 652.84 N 942.86W 2980.00 56.05 304.99 1.88 2616.77 1163.4 304.7 662.31 N 956.44W 3000.00 56.31 305.19 1.53 2627.90 1180.0 304.7 671.86 N 970.04W 3020.00 56.26 305.46 1.14 2639.01 1196.6 304.7 681.48 N 983.61 W 3040.00 56.60 305.56 1.71 2650.06 1213.3 304.7 691.16 N 997.18W 3060.00 56.62 305.83 1.13 2661.07 1230.0 304.7 700.91 N 1010.74W 3080.00 57.22 306.03 3.11 2671.99 1246.7 304.8 710.74N 1024.31W 3100.00 57.80 306.01 2.93 2682.73 1263.6 304.8 720.66N 1037.95W 3120.00 58.14 306.36 2.26 2693.34 1280.6 304.8 730.67 N 1051.64W 3140.00 58.89 306.44 3.76 2703.78 1297.6 304.8 740.79 N 1065.37W 3160.00 59.29 306.55 2.04 2714.06 1314.8 304.8 751.00 N 1079.16W 3180.00 59.82 306.47 2.70 2724.19 1332.0 304.9 761.25 N 1093.02W 3200.00 60.26 306.48 2.20 2734.18 1349.3 304.9 771.56N 1106.95W A Gyrodata Directional Survey BP ALASKA Location: NABORS 33-E, N.S. BOROUGH Lease: NORTHSTAR Well: NS33, 16" CASING Job Number: AK0207G 506 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 3220.00 60.56 306.44 1.48 2744.05 1366.7 304.9 781.89 N 1120.94W 3240.00 60.83 306.42 1.38 2753.84 1384.1 304.9 792.25 N 1134.97W 3260.00 60.84 306.60 0.78 2763.59 1401.6 304.9 802.64 N 1149.01 W 3280.00 61.29 306.69 2.31 2773.26 1419.1 305.0 813.09 N 1163.OSW 3300.00 61.32 306.62 0.31 2782.87 1436.6 305.0 823.56N 1177.13W 3320.00 61.57 306.75 1.42 2792.43 1454.2 305.0 834.06 N 1191.21 W 3340.00 61.68 307.01 1.26 2801.93 1471.8 305.0 844.62 N 1205.29W 3360.00 61.94 307.23 1.59 2811.38 1489.4 305.0 855.26 N 1219.35W 3380.00 62.25 307.20 1.56 2820.74 1507.0 305.1 865.95 N 1233.42W 3400.00 63.01 307.28 3.82. 2829.93 1524.8 305.1 876.69 N 1247.56W 3420.00 63.69 307.38 3.41 2838.90 1542.7 305.1 887.53 N 1261.77W 3440.00 63.77 307.51 0.71 2847.76 1560.6 305.1 898.44 N 1276.01 W 3460.00 64.03 307.48 1.29 2856.56 1578.5 305.2 909.37 N 1290.26W 3480.00 64.56 307.47 2.69 2865.23 1596.5 305.2 920.34 N 1304.56W 3500.00 65.32 307.62 3.86 2873.70 1614.6 305.2 931.38N 1318.93W 3520.00 66.02 307.37 3.64 2881.94 1632.8 305.3 942.47 N 1333.39W 3540.00 66.68 307.37 3.29 2889.96 1651.1 305.3 953.59N 1347.95W 3560.00 67.67 307.31 5.00 2897.72 1669.6 305.3 964.77 N 1362.60W A Gyrodata Directional Survey BP ALASKA Location: NABORS 33-E, N.S. BOROUGH Lease: NORTHSTAR Well: NS33, 16" CASING Job Number: AK0207G 506 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. i 3580.00 68.01 307.19 1.77 2905.27 1688.1 305.3 975.98 N 1377.35W 3600.00 67.95 307.06 0.69 2912.76 1706.6 305.3 987.17 N 1392.13W 3620.00 67.78 307.21 1.09 2920.30 1725.1 305.4 998.36 N 1406.90W 3640.00 68.22 307.21 2.18 2927.79 1743.7 305.4 1009.57 N 1421.67W 3660.00 68.78 307.21 2.80 2935.12 1762.3 305.4 1020.82 N 1436.49W 3680.00 69.04 307.44 1.69 2942.32 1780.9 305.4 1032.14N 1451.33W 3700.00 69.64 307.28 3.08 2949.37 1799.6 305.4 1043.49 N 1466.20W 3720.00 70.29 307.59 3.58 2956.23 1818.4 305.5 1054.91 N 1481.12W 3740.00 70.79 307.46 2.58 2962.89 1837.2 305.5 1066.40 N 1496.08W 3760.00 71.45 307.61 3.36 2969.36 1856.2 305.5 1077.93 N 1511.08W 3780.00 71.42 307.65 0.27 2975.73 1875.1 305.5 1089.50 N 1526.1OW 3800.00 71.69 307.88 1.70 2982.05 1894.1 305.5 1101.12N 1541.1OW 3820.00 71.81 307.87 0.61 2988.32 1913.0 305.6 1112.79 N 1556.09W 3840.00 72.05 307.56 1.89 2994.52 1932.0 305.6 1124.42 N 1571.13W 3860.00 71.83 307.37 1.45 3000.72 1951.0 305.6 1135.98 N 1586.22W 3880.00 71.90 306.95 2.00 3006.95 1970.0 305.6 1147.46 N 1601.37W 3900.00 71.92 306.45 2.39 3013.16 1989.0 305.6 1158.83 N 1616.61 W 3920.00 71.93 305.99 2.17 3019.37 2008.1 305.6 1170.06 N 1631.95W A Gyrodata Directional Survey BP ALASKA Location: NABORS 33-E, N.S. BOROUGH Lease: NORTHSTAR Well: NS33, 16" CASING Job Number: AK0207G 506 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COOR DINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 3940.00 71.36 305.55 3.54 3025.66 2027.0 305.6 1181.16 N 1647.35W 3960.00 71.27 305.44 0.69 3032.07 2046.0 305.6 1192.16 N 1662.78W 3980.00 71.21 305.32 0.61 3038.50 2064.9 305.6 1203.12 N 1678.22W 4000.00 71.29 305.49 0.86 3044.93 2083.9 305.6 1214.09N 1693.65W 4020.00 71.18 305.57 0.67 3051.36 2102.8 305.6 1225.10 N 1709.07W 4040.00 70.73 305.69 2.33 3057.89 2121.7 305.6 1236.11 N 1724.43W 4060.00 70.36 306.07 2.57 3064.55 2140.6 305.6 1247.16 N 1739.71 W 4080.00 70.56 306.30 1.46 3071.24 2159.4 305.6 1258.29N 1754.93W 4100.00 70.55 306.50 0.95 3077.89 2178.3 305.6 1269.48 N 1770.11 W 4120.00 70.24 306.53 1.57 3084.60 2197.1 305.7 1280.69 N 1785.25W 4140.00 70.30 306.43 0.56 3091.36 2215.9 305.7 1291.89N 1800.38W 4160.00 70.07 306.58 1.34 3098.14 2234.7 305.7 1303.08 N 1815.51 W 4180.00 70.14 306.96 1.83 3104.94 2253.5 305.7 1314.34 N 1830.57W 4200.00 69.80 306.85 1.80 3111.79 2272.3 305.7 1325.62 N 1845.60W 4220.00 69.70 306.73 0.73 3118.72 2291.1 305.7 1336.86N 1860.63W 4240.00 69.73 306.70 0.18 3125.65 2309.9 305.7 1348.07 N 1875.66W 4260.00 69.86 306.63 0.73 3132.56 2328.6 305.7 1359.28 N 1890.72W 4280.00 70.19 306.51 1.77 3139.39 2347.4 305.7 1370.48N 1905.81W 4300.00 70.13 306.49 0.33 3146.18 2366.2 305.7 1381.67 N 1920.94W s A Gyrodata Directional Survey BP ALASKA Location: NABORS 33-E, N.S. BOROUGH Lease: NORTHSTAR Well: NS33, 16" CASING Job Number: AK0207G 506 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 4320.00 70.11 306.56 0.37 3152.98 2385.0 305.7 1392.87 N 1936.OSW 4340.00 70.53 306.46 2.17 3159.71 2403.9 305.7 1404.07 N 1951.19W 4360.00 70.83 305.92 2.99 3166.33 2422.7 305.7 1415.22 N 1966.42W 4380.00 70.92 305.87 0.52 3172.88 2441.6 305.7 1426.29N 1981.73W 4399.69 70.42 305.91 2.57 3179.40 2460.2 305.7 1437.19 N 1996.78W Final Station Closure: Distance: 2460.21 ft Az: 305.74 deg. Survey QC - RGS-CT Acceptance Sheet ,~ FIELD AND SURVEY iNEnRnneTrnN Operator BP ALASKA Field /Platform NABORS 33-E Well Number NORTHSTAR NS33 Survey section From 900.00 ft. to 4399.70 ft. Date 4/3/2007 Gyrodata Job No AK0207G_506 Gyrodata Surveyors HENRY DREW Job Objective High Accuracy Gyro Survey SURVEY PERFORMANCE QC Parameter In Spec' Yes/No/NA Possible Actions Operational temperature within Yes Contact Duty Engineer to discuss options: 1. Recalibrate tool to higher temperature specification 2. Resurvey with backup tool 3. Resurvey 'Hot' section at higher speed Roll test data within specification Only valid on land/fixed installations Contact Duty Engineer to discuss options: Yes 1. Recalibrate tool and reprocess survey Continuous initialisation within 2. Resurve with backu tool Take new initialisation after three failures: specification Yes , 1. Contact Duty Engineer or , 2. Resurve with backu tool. Toolface rate within specification Yes Contact Duty Engineer to discuss options: Resurvey section from previous bias check Investi ate and comment if effects are ne li ible Drift tunes within specification Yes Contact Duty Engineer to discuss options: 1, Reprocess with different software settings Inrun/Outrun comparison within 2. Resurve with backu tool Contact Duty Engineer to discuss options specification Yes . Resurvey is usually not required if either inrun or outrun meet all other C arameters Depth control within specification Yes Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV-Q 166 (OPS SUR-MA-003) 13th Nov 03 /Revision 12 Page 1 of 1 AK0207G_506 Survey QC - RGS-CT Analysis Sheet SURVEY QUALITY CONTROL -DATA ANALYSIS RFFFRFN['F cvcTCnec Grid S stem Grid Correction 0.00 Azimuth reference: Grid /True North TRUE NORTH Vertical reference: RKB MSL/Other RKB If other ive details TTF nN Hera De th 0.00 Inclination 0.00 Azimuth 0.00 TVD 0.00 Northin s 0.00 Eastin s 0.00 Latitude 70.4916 Az. Ref: Grid True Grid Corrected Y N? Descri lion CALIBRATION Tool Number 3039 Calibration Date 02 Feb 2007 OPERATING TEMPERATURE Calibration ran e From 49.89 To 119.76 '_Gyro operating range From 71 35 To Sz 6a Gnar' - IA/ith' I'h t' FTFI n RAI I TFGT /nni„ „era ,, ., a;.,,,a ,.....,_..,.___ ,.,~__ _ _~ _ ., .. . _.._ Cal value _.. __-- --. __- Pre ob offset _._,,. ...,.....~.,. Post 'ob offset ,..,,.,~~~~ ~~~ u~ ~~~~ Abs dif.cal. ost ~ca~ ua~a e~iUUneu Abs dif. re. ost dicer reLUrrl CO OaSe Sec' Accel Scale 0.000000 0.000000 N A Cal/Post - 0.00015 Mass Unbalance 0.00 0.00 N A Pre Post - 0.4° hr TNTTTeITCeTrnni De th A rox 900.21 No of stns 6 Sec' -Min No - 6 Azimuth Mean 311.03 Std deviation 0.18 . Sec' - Azi SD 0 2° Inclination Mean 14.17 Std deviation 0.00 . Sec' -Inc SD 0 1° Earth Horizontal Rate Mean Abs meas-theor 0.62 Std deviation 0.01 . Sec' -See 167 DRIFT TUNE Residual x ro bias Mean -0.000 Std dev' 0.001 Sec's -Mean and SD - 0.333~/hr Residual ro bias Mean 0.000 Std dev' 0.000 Sec's -Mean and SD - 0.333°/hr TOOLFACE RATE Maximum toolface rate 10.31 Spec' 400°/sec IN /n1YT CnMDe DTCnN /n~r~ ni ie rc rw~n~ Inclination Difference Mean 0.02 Std dev' 0.03 Sec's -Casin 0.3° Drill i e 0.3° Azimuth Difference Mean -0.18 Std dev' 0.27 Sec's -Casin 0.5°/Drill i e 0.75° Lateral Diver ence 1000 1.19 Sec - 5.0/1000 Vertical Diver ence 1000 0.18 Sec' - 2.0 1000 DEPTH CANTRr11 Wireline Com an SLB Line t e 15 32 Encoder SF Max De th TD 4380 CCL Corrected Yes Zero De th Ri u RKB Rezero De th -2.8 Given u 'oint de th NA Measured PJ NA Strech cor. At TD divided b TD/1000 Dif. Between ri u and rezero de the divided b TD 1000 Dif. Between iven and meas de th divided b meas 1000 .7306 .6393 NA Sec' - 1.5/1000 Sec' - 2.0 1000 Sec' - 2.0 1000 SURV-Q365 (OPS SUR-MA-010) 22nd Jan 2004 /Revision 20 Page 1 of 1 AK0207G_506 Survey QC - RGS-CT Specification Sheet ~'~I#~i ~~. JVKVtY e<,uALirv CONTROL -SPECIFICATION DATA PRE-JOB CALIBRATION VERIFICATION CHECK (ROLL TEST) POST-JOB CALIBRATION VERIFICATION CHECK (ROLL TE5T) TNTTTeITCeTTnn~ Gyro Compass Reading /Station Raw Inclination Raw Azimuth Abs (ERMeas-ERrneo) 14 14,17 311,28 0.6211 15 14.17 311.09 0.6128 16 14.17 310.96 0.6130 17 14.17 311.21 0.6149 18 14.17 310.90 0.6075 19 14.17 310.75 0.6310 Average 14.17 311.03 0.6167 Tolerance on Average* 0.0842 Standard Deviation 0.00 0.18 0.0075 Tolerance on St. Dev.** 0.1~ 0.2~ 0.0405 Advanced Initialisation Azimuth Advanced Initialisation Standard Deviation Tolerance = TBA * Tolerance oh Average of earth horizontal rate difference is given by (1/Cosh * J[(COSA*Sinl*0.1)2+IL.D[i2] o/hr ** Tolerance on Standard Deviation of earth horizontal rate difference tolerance is given by (1/Cosh *J[(COSA*Sinl*0.1)2+(0.082/(n-1))] o/hr DRIFT TIINFC Drift Tune Number Ending Time Ending Depth Ending Inclination Ending Azimuth Residual Gx Bias Residual Gy Bias Start End Start End 1 1427.16 2700.17 47,62 303.75 -0.000 0.001 0.000 0.001 2 1366.44 4400.06 70.35 305,94 0.000 0.000 0.000 0.000 3 440.66 4380.17 70.35 305,87 0.001 -0,001 0.000 -0.000 4 1320,91 2700.99 47,75 303.80 0.000 0.000 -0.000 0.000 5 1442.34 900.40 14.20 311,77 -0.000 0.000 -0.000 0.001 Average 0.000 -0.000 0.000 0.000 Standard Deviation 0.001 0.001 0.000 0.000 Tolerance for both the Average and the Standard Deviation 0.033/hr 0.033/hr 0,033/hr 0.033/hr INCLINATION AND AZIMUTH INRUN AND OUTRUN COMPARI Depth Corrected Inclination Inrun * Outrun * Difference 100.00 0.88 0.90 -0.02 200,00 0.65 0.60 0.05 300.00 2.23 2.13 0.10 400.00 4.14 4.01 0.13 500.00 6.40 6,28 0.12 Corrected Azimuth Inrun * Outrun * Difference 26.03 28.62 -2.59 0.31 12.00 -11.69 309.09 302.23 6.86 293.83 292,99 0.84 299,81 301.90 -2.09 SURV-Q 167 (OPS SUR-MA-003) 19`" Nav 03 /Rev 15 Page 1 oP 6 AK0207G_506 Survey QC - RGS-CT Specification Sheet J/I'~C~~t- buu.uu 9.31 9.46 -0.15 304,43 304.48 -0 06 700.00 10.33 10,38 -0,05 305.65 306.61 , -0 96 800.00 10.93 10.92 0.01 313.52 314.27 . -0 76 900.00 14.16 14.15 0.01 311.00 311.82 . -0 82 920.00 14,74 14,71 0.03 310.88 311.73 . -0.86 940.00 15.80 15.69 0.11 310.60 311.29 -0 69 960.00 16.16 16,14 0.03 310,13 310.86 . -0 73 980.00 16.45 16.44 0.01 309.89 310.70 . -0 81 1000.00 16.65 16.65 0.00 309.77 310.12 , -0.35 1020.00 16.94 16,91 0.03 309.42 309.91 -0.48 1040,00 17,20 17,18 0.02 308.94 309.49 -0,55 1060.00 17.72 17,72 0,01 308.61 309.35 -0 74 1080.00 18.40 18.39 0.01 308.64 309.32 . -0.68 1100.00 18,94 18.94 0.01 308.09 308.67 -0.59 1120.00 19.27 19.28 -0,01 307.41 307.95 -0.54 1140.00 19.70 19.71 -0,01 307.03 307.55 -0.53 1160.00 19.87 19.88 -0.01 306.83 307.30 -0.47 1180.00 20.03 20.02 0.01 306, 74 307,18 -0.44 1200.00 19.56 19.55 0.01 306.56 307.19 -0,63 1220.00 19.06 19.05 0.01 306.57 307.26 -0.69 1240.00 18.61 18.58 0.02 306.62 307.41 -0.79 1260.00 18.16 18.14 0.02 306.60 307.46 -0.87 1280.00 17.94 17.91 0.03 306.77 307.63 -0.86 1300,00 17.87 17,85 0.03 306.94 307.55 -0.61 1320,00 17.68 17.65 0,03 307.17 307.91 -0.74 1340.00 17.65 17.62 0.03 307.70 308.30 -0.59 1360.00 17.62 17.58 0.04 307,87 308.91 -1.04 1380.00 17,66 17.63 0.02 308.30 309.00 -0.70 1400.00 17.87 17,83 0.04 308.69 309,42 -0.73 1420.00 18.05 18.03 0.03 309.01 309.67 -0.67 1440.00 18, 55 18, 51 0.03 308.94 309.68 -0.73 1460.00 18,84 18.81 0,03 308,82 309.27 -0.45 1480.00 19.28 19.29 -0.01 308.40 308.73 -0,33 1500,00 19.78 19.72 0.07 307.27 307.65 -0.38 1520.00 20.43 20,20 0.23 305.64 306.31 -0.66 1540.00 21.17 21.03 0.14 303.24 303.72 -0.48 1560.00 21.96 21.86 0.10 300.90 301.43 -0.53 1580.00 22.84 22.77 0.07 299.39 299.88 -0.49 1600.00 23.15 23.13 0.03 298.54 298.72 -0.19 1620.00 23.81 23.79 0.02 298.06 298.27 -0.20 1640.00 24.15 24.14 0.01 297.98 298.12 -0.14 1660.00 24.80 24.79 0.01 298,36 298.47 -0,11 1680.00 25.35 25.34 0.01 298.87 298.99 -0.12 1700.00 25.96 25.95 0.01 299.35 299.31 0.04 1720.00 26.74 26.72 0.02 300.23 300.14 0.09 SURV-Q167 (OPS SUR-MA-003) 19~h Nov 03 /Rev 15 Page 2 of 6 AK0207G 506 Survey QC - RGS-CT Specification Sheet ....... 1 /4U.UU 16.97 26.97 0.00 300.75 300.89 -0 15 1760.00 27.50 27,50 0.00 301.21 301,42 , -0 21 1780.00 27.94 27.94 0.00 301.65 301,87 , -0 22 1800.00 28.30 28.30 -0.00 301.93 302.25 , -0 32 1820.00 28.65 28.65 0.00 302.46 302,69 . -0.23 1840,00 28.91 28.92 -0.01 302.38 302.66 -0 28 1860.00 29,41 29.43 -0.02 302.71 302.90 . -0 19 1880.00 29.81 29.80 0.01 303.08 303.29 . -0.21 1900.00 30.23 30.23 0.00 303.20 303.53 -0 33 1920.00 31.01 31.00 0.01 303.06 303.28 . -0.22 1940.00 31.42 31.44 -0.01 303.13 303,34 -0 21 1960.00 31.62 31.62 -0.00 303.28 303,43 . -0.16 1980.00 31.90 31.88 0.02 303.50 303,77 -0.27 2000.00 32.38 32.38 0.00 303.58 303.72 -0 14 2020.00 32.60 32.59 0.01 303.76 303.92 . -0.16 2040.00 33.00 33.01 -0.00 304.11 304.30 -0.19 2060.00 32.80 32.81 -0.01 304.64 304.74 -0 10 2080.00 32.96 32.96 0.01 304.64 304.84 . -0 20 2100.00 33.57 33.57 -0.00 304.50 304.75 . -0 25 2120.00 33.96 33,95 0.00 304.55 304,75 . -0.20 2140.00 34.58 34.58 -0.01 304.63 304.69 -0 06 2160.00 34.69 34.68 0.01 304.45 304.58 . -0 13 2180.00 35.26 35.25 0.01 304.49 304.80 . -0 31 2200.00 35.75 35.75 0.00 304.53 304.84 . -0 31 2220.00 36.33 36.31 0.03 304.11 304.45 . -0.33 2240.00 36.94 36,91 0.03 304.21 304.44 -0.23 2260.00 37.53 37.49 0.03 304.32 304.58 -0.26 2280.00 38.17 38.16 0.02 304.00 304.31 -0.31 2300.00 38.88 38.88 0.00 303.89 304.13 -0.24 2320.00 39.23 39.21 0.02 303,65 303.93 -0.28 2340.00 39.92 39.90 0.02 303.37 303.64 -0.27 2360.00 40.31 40.29 0.02 303.37 303.62 -0.26 2380.00 41.17 41.15 0.02 303.37 303.57 -0.20 2400.00 41.97 41.96 0.01 303.33 303.54 -0.21 2420.00. 42.46 42.46 0.01 303.44 303,63 -0.19 2440.00 43.03 43.06 -0.02 303.27 303.35 -0.07 2460.00 43.24 43.22 0.02 303.27 303.39 -0.12 2480.00 43.73 43.72 0.02 303,42 303.54 -0.12 2500.00 43.84 43.83 0.01 303.48 303.67 -0.19 2520.00 44.11 44.10 0.01 303.35 303.49 -0.14 2540.00 44.19 44.18 0.01 303,18 303.41 -0.23 2560.00 44.55 44.53 0.01 303.23 303.49 -0.25 2580.00 44.93 44.92 0.01 303.21 303.37 -0,16 2600.00 45.11 45.10 0.01 303.23 303.51 -0.28 2620.00 45.84 45.81 0.02 303.48 303.59 -0.12 SURV-Q 167 (OPS SUR-MA-003) 19~" Nov 03 /Rev SS Page 3 of 6 AK0207G 506 Survey QC - RGS-CT Specification Sheet 2640.00 46.23 46.21 0.03 303.37 303.46 -0 08 2660.00 46.75 46.72 0.03 303.54 303.64 . -0 09 2680.00 47.16 47.19 -0.03 303.60 303,70 . -0 09 2700.00 47.55 47.50 0,05 303.75 303.86 . -0 11 2720.00 48.60 48.55 0.05 303.70 303.78 . -0.07 2740.00 49.22 49,21 0.01 303.73 303,76 -0 03 2760.00 49.86 49.83 0.03 303.69 303.91 . -0 22 2780.00 50.44 50.46 -0.02 303.85 303,99 . -0 14 2800.00 50.92 50.86 0.06 303.98 304.00 . -0 02 2820,00 51.39 51.40 -0.01 304.15 304.19 . -0.04 2840.00 51.73 51.70 0.03 304.14 304.20 -0 06 2860,00 52,41 52.36 0.04 304.25 304.28 . -0 03 2880.00 53.05 53.00 0.05 304.41 304,42 . -0 01 2900.00 53.89 53.88 0.01 304.48 304.46 . 0 03 2920.00 54.51 54.48 0.03 304.73 304.73 . 0.00 2940.00 55.00 54.94 0.06 304.71 304.69 0 02 2960.00 55.75 55.71 0.04 304.84 304,79 . 0 06 2980.00 56.09 56.05 0.04 305.07 304.99 . 0 08 3000.00 56.30 56.31 -0.01 305,20 305.19 . 0 01 3020.00 56.31 56.26 0.04 305.55 305.46 , 0.09 3040.00 56,61 56.60 0.02 305.67 305,56 0 11 3060.00 56.64 56.62 0.02 306.09 305.83 . 0 26 3080.00 57.26 57.22 0.04 306.23 306.03 . 0 20 3100.00 57.85 57.80 0,04 306.14 306.01 . 0 14 3120.00 58.14 58.14 0.00 306.44 306.36 . 0.08 3140.00 58.93 58.89 0.04 306.58 306.44 0 14 3160.00 59.29 59.29 0.01 306.64 306.55 . 0 09 3180.00 59.86 59.82 0.04 306.64 306.47 . 0 18 3200.00 60.28 60.26 0.02 306.52 306.48 . 0 04 3220.00 60.54 60.56 -0.02 306.52 306.44 . 0.08 3240.00 60.87 60,83 0.04 306.53 306.42 0 11 3260,00 60.86 60,84 0,02 306.78 306.60 . 0 18 3280.00 61.28 61.29 -0.01 306.77 306.69 . 0.08 3300.00 61.33 61.32 0.01 306.68 306.62 0.06 3320.00 61.60 61.57 0.03 306.80 306.75 0.05 3340.00 61.70 61.68 0.02 307.10 307.01 0.09 3360.00 61.95 61.94 0.01 307.37 307.23 0.14 3380.00 62.28 62.25 0,03 307.37 307,20 0.16 3400.00 63.05 63.01 0.04 307.37 307.28 0.10 3420,00 63.73 63,69 0.04 307.48 307.38 0.09 3440.00 63.78 63,77 0,01 307.67 307.51 0.16 3460.00 64,08 64.03 0.06 307.48 307.48 -0,00 3480.00 64.60 64.56 0.04 307.42 307.47 -0.05 3500.00 65.35 65.32 0.03 307.49 307.62 -0,12 3520,00 66.03 66.02 0.02 307.10 307,37 -0.27 SURV-Q 167 (OPS SUR-MA-003) 19~" Nov 03 /Rev 1S Page 4 of 6 AK0207G_506 Survey QC - RGS-CT Specification Sheet ~~/'"~L"tt'~ _~._..r.... s54u.uu 66,66 66.68 -0.02 307.13 307.37 -0 24 3560.00 67.67 67.67 -0.01 307.00 307.31 . -0 32 3580.00 68.01 68.01 -0.01 306.86 307.19 . -0 33 3600.00 67.96 67.95 0.01 306.88 307.06 . -0 18 3620.00 67.80 67,78 0.02 307.10 307.21 , -0,11 3640.00 68.29 68,22 0.07 307.28 307.21 0 07 3660.00 68.78 68.78 0.00 307.26 307.21 . 0 06 3680.00 69.06 69.04 0.02 307.60 307.44 . 0 16 3700.00 69.66 69.64 0.02 307,50 307.28 . 0 22 3720.00 70.33 70.29 0,04 307,80 307.59 . 0.21 3740,00 70.83 70,79 0.04 307,72 307.46 0 26 3760.00 71.45 71,45 -0.00 307,76 307,61 . 0 15 3780.00 71.45 71.42 0,03 307.81 307.65 . 0 16 3800.00 71.71 71.69 0.03 307.96 307.88 . 0 08 3820.00 71.83 71,81 0.02 307.93 307.87 . 0.06 3840.00 72.07 72.05 0,02 307.46 307.56 -0 10 3860,00 71.85 71.83 0.02 307,08 307.37 . -0.28 3880.00 71.92 71.90 0.03 306.59 306,95 -0.36 3900.00 71.94 71,92 0.02 306.13 306,45 -0 32 3920.00 71.93 71.93 0,01 305.71 305.99 . -0.28 3940.00 71.36 71.36 -0.00 305.32 305.55 -0.23 3960.00 71.28 71,27 0.01 305,29 305.44 -0.15 3980.00 71.22 71.21 0.00 305.27 305.32 -0.06 4000.00 71.32 71.29 0.02 305.51 305.49 0.02 4020.00 71.20 71.18 0.01 305.65 305,57 0.08 4040.00 70.76 70.73 0.03 305.79 305.69 0.10 4060.00 70.36 70.36 -0.00 306.17 306.07 0.10 4080.00 70.56 70.56 0,00 306.40 306,30 0.10 4100.00 70,55 70.55 -0.00 306.47 306.50 -0,03 4120.00 70.26 70.24 0.02 306.50 306,53 -0.03 4140.00 70.32 70.30 0.03 306,47 306.43 0.04 4160.00 70.09 70.07 0.02 306,67 306.58 0.09 4180.00 70.19 70.14 0.05 307.05 306.96 0,08 4200.00 69,82 69.80 0.02 306.89 306.85 0.05 4220.00 69.72 69.70 0.02 306,75 306.73 0.02 4240.00 69.83 69.73 0.10 306.65 306.70 -0,05 4260.00 69.93 69.86 0.07 306.69 306.63 0.06 4280.00 70,21 70.19 0.02 306.43 306.51 -0.09 4300.00 70.17 70,13 0.04 306.43 306.49 -0.07 4320.00 70.03 70.11 -0.08 306.53 306.56 -0.03 4340.00 70,51 70.53 -0,02 306,54 306.46 0.07 4360.00 70.78 70.83 -0.05 305.91 305.92 -0.01 4380.00 70.99 70,92 0.06 305,83 305.87 -0.04 Average 0.0202 -0.1758 SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 5 of 6 AK0207G_506 Survey QC - RGS-CT Specification Sheet Standard Deviation 0.0349 0.2674 Casing 0.5~ >rilloioe 0.750 Tolerance for both the Average and the Standard Casing 0,3~ Deviation Drillpipe 0.3~ Inclination and Azimuth interpolated to same depths as shown. SURV-Q 167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 6 of 6 AK0207G 506 BP ALASKA WeII: NORTHSTAR NS33 16" CASING 7C 60 50 z 0 I 40 Q z J U z 30 20 10 0 Interp Outrun Gyrodata ' AKn~n~~ SnF. f1FGT1\ITTT\/C - -- -;---------------------------------~-------- ------------ -~"~~-BOTT -- - - - OM HOLE ,} LOCATED i MD: 4399.69 ~; --------- ~-------- - ----------------- - i-------------- ----------------------- ,-- s ----------- - --- f ----------------- - --~- • • ~~~ lvvu 1JUU Luuu LSUU 3000 3500 4000 4500 5001 MEASURED DEPTH (ft) BP ALASKA Well: NORTHSTAR NS33 16" CASING Location: NABORS 33-E. N_S_ RnRni irH Interp Outrun ~vrnriata 30C 25C 200 N Q 150 100 50 i ~J v ~uu luuu 15UU 2000 2500 3000 3500 4000 4500 5000 MEASURED DEPTH (ft) BP ALASKA Well: NORTHSTAR NS33 16" CASING Location: NABORS 33-F Ns Rnrzni i~N 140 1200 1000 w ~ 800 z F- 0 z 600 400 200 0 Interp Outrun I r-.,~~.,,}, ~ • ••-~~... _ vv v~l 11Y111VL Q -- --•-•~---- •• ' - - - - BOTTOM HOL LOCATED ~`•~ • D ::4399.69 ~•~ '. •~ •~ •~ .~ -------- -----R!t~ -- ----- ----- ---------- •~ •o s~ •~ • •~ ~~ ----- ti~ ~i -,~„~ i • ~.~vv -iovv -tc~ut~ -l~+uu -1LUU -1000 -800 -600 -400 -200 0 FASTING (ft) BP ALASKA Well: NORTHSTAR NS33 16" CASING Location: NABORS 33-E, N.S. BOROUGH 1" 0 0 ~ E rn v _~ C U..~ w w q J 3 2 1 Interp Outrun BOTTOM HOLD LOCATED MD: 4399.69 - - ------ 2 ----------------=-------------------- ---- • ~~~ 1~~~ lw~ ~uvu ~5vu 3000 3500 4000 4500 500 MEASURED DEPTH (ft} !~ rnn 2008 Northstar Drilling Plans ~ Page 1 of 2 Maunder, Thomas E (DQA) From: Kara, Danny T ~Danny.Kara@bp.com] Sent: Monday, January 14, 2008 4:54 PM To: Maunder, Thomas E (DOA}; Monkelien, Kyte (MMS) Cc: Crane, Lowell R Subject: 2008 Northstar Dri#ling Plans Attachments: NS16A Drilling Permit.pdf; Northstar NS34A .ppt Tom/Kyle, 1 thought I'd send you guys an update of the drilling plans for Northstar this year. The quick summary is sidetrack NS16a and finish NS34. N~33 will be deferred unti# the '09 ice road season. We're actively building ice to the island - we need sufficient ice road thickness to support Schlumberger's cementer, before we can start any openhole drilling. A# this time we're estimating about Jan 26m for heavy equipment travel on the ice road. We plan to MIRU on NS16 and begin the tubing 8~ 9-518" casing cut and pull on abou# Jan 18th. That will a#low us about a week of rigging up and dealing with the uncertainties associated with the decomplete -get #hat off the critical path. So our first BOP test will be sometime around Jan 22"d. In summary, we will cut/pull the 9-5/8" below the 13-318" surface casing shoe, pump cement, sidetrack from below the surface pipe w/ 12-1/4" to the Miluveach and cement 9-518" casing, drill the Miluveach/Kingaksnd line with 7" to the top of Sag, drill the Sag/Ivishak production hole and cement in a 4-1/2" liner, then complete with 4-1/2" 13Cr tubing. I've attached the approved NS16A PTD for your reference. NS16A sidetrack should take ~35 days. NS34, #o refresh your memory, was attempted last year but we lost the hole and BHA in the MiluveachlKingak sec#ion. The we## is suspended with 13-3/8" surface casing set in the SV sands, and 9-518" intermediate casing cemented into the top of Kuparuk. We pumped cement into the openhole below the 9-5/8" shoe. An extensive review of the log data suggests the Miluveach instability was probably driven by proximity to faulting and wellbore roof collapse associated with borehole inclination approaching that of bedding planes (Drit#ing is still trying to blame the Geologist for these, again). Our solution wilt be to move the well away from the fault as far as possible (limited by exiting the 9-518" shoe) and reduce the inclination of the hole thru the shales. We will not underream the Miluveach/Kingak, from 8-1 /2" to 9-112", as we've done in the past - underreamers make dealing with unstable hole conditions very difficult. instead of opening the hole we'll reduce the liner size from 7" to 6-518", down to top of Sag. We'll finish the production hole a 5-7/8" bit and 4-112" cemented liner. We have plenty of contingency cases lined up in the event wellbore instability continues to be a problem. Dave Johnson is currently working the PTD application and you guys should see it sometime next week. NS34A should take about 5 weeks to finish. 1've attached a couple of slides which summarize NS34. With good planning and some luck we hope to complete the drilling season before May 1St. Please call with questions. Thanks Dan Kara Engineering Team Lead NorthstariMilne Point/Endicott Uriliing 2/7/2008 ~'P ~ ~ Date 07-06-2007 Transmittal Number:92896 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. If you have any questions, please contact me in the PDC ~t ~tin_nnoi Log Top SW Name Date Contractor Run De th Bottom De th Lo T e NS16 04-30-2007 SCH 1 11775 12380 CEMENT BOND LOG -FINAL ULTRASONIC CORROSION NS33P61 04-29-2007 SCH 2 100 5500 USIT -FINAL TRUE VERTICAL SUB SEA VISION RESISTIVITY -FIELD NS33PB1 03-30-2007 SCH 1 200 23236 VERSION TRUE VERICAL VISION RESISTIVITY -FIELD NS33P61 03-30-2007 SCH 1 200 23236 VERSION MEASURED DEPTH VISION RESISTIVITY -FIELD NS33PB1 03-30-2007 SCH 1 200 23236 VERSION TRUE VERTICAL SUB SEA VISION RESISTIVITY -FIELD NS33PB2 04-09-2007 SCH 1 200 23460 VERSION TRUE VERTICAL VISION RESISTIVITY -FIELD NS33PB2 04-09-2007 SCH 1 200 23460 VERSION MEASURED DEPTH VISION RESISTIVITY -FIELD NS33PB2 04-09-2007 SCH 1 200 23460 VERSION TIGHT HOLE RAW FIELD NS33PB1 03-30-2007 SCH 1 203 23236.5 DATA CD ROM TIGHT HOLE RAW FIELD NS33PB2 04-09-2007 SCH 1 203 23459.5 DATA CD ROM l./ Please Sign and Return one copy of this transmittal. Thank You, Andy Farmer Petrotechnical Data Center ~~p~~~~ Attn: Doug Chromanski Ignacio Herrera Howard Okland Kristin Dirks Cheryl Ploegstra MMS ~ r 5~~ ~; Murphy Exploration AOGCC DNR BPXA (no CD ROM) Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 IJ ~5~~. ~ ~ ~0~7 ~ S Wis. 'a~~t~~ ~~haragge ~~ ~~~ ~~`~~~ BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. If you have any questions, please contact me in the PDC at SFi4-4n91. SW Name Date Contractor Log Run Top De th Bottom De th Lo T e NS34PB1 01-27-2007 SPERRY END OF WELL REPORT NS33PB1/P62 01-29-2007 SPERRY END OF WELL REPORT Please Sign and Return one copy of this transmittal. Thank You, Andy Farmer Petrotechnical Data Center Attn: Christine Mahnken Kristin Dirks Doug Chromanski Ignacio Herrera ~O(o~ /~tl '~ !S o~Lllo Date 06-28-2007 Transmittal Number:92894 ~~ ~ ~ ~~~~ ~a~a C7i! ~ Gas ~~ns. ~isai~ Anc~rage Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 ~ ~~ I~E~EIVE6 STATE OF ALASKA , ALASKA OIL AND GAS CONSERVATION COMMISSION ~+~Y 3 1 2007 WELL COMPLETION OR RECOMPLETION REPORT AND LOGI~;ska :i~ ~ Gas Cons. Commission Anrh 1 a. Well Status: ^ Oil ^ Gas ^ Plugged ^ Abandoned ®Suspended zoAAC zs.,os zoAAC zs.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero 1 b. Well Class: ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp. usp or Aba 4/ 07 .f~ 12. Permit to Drill Number 206-138 ~ 307-145 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 1/29/2007 ~ 13. API Number 50-029-23325-00-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 4/3!2007 ~ 14. Well Name and Number: NS33 1369 FSL, 650 FEL, SEC. 11, T13N, R13E, UM Top of Productive Horizon: N/A g KB (ft above MSL): 56.6' ~ Ground (ft MSL): 16.1 15. Field /Pool(s): Northstar Unit _ Total Depth: 3255' FSL, 973' FEL, SEC. 32, T14N, R13E, UM 9. Plug Back Depth (MD+TVD) 16415 7007 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 659821 y- 6031141 Zone- ASP4 10. Total Depth (MD+TVD) 23460 ~ 9450 16. Property Designation: ADL3~98~(~! TPI: x- N/A y_ N/A Zone- N/A Total Depth: x- 643385 y- 6043254 Zone- ASP4 11. SSSV Depth (MD+TVD) N/A N/A 17. Land Use Permit: LO-N96-006 18. Directional Survey ®Yes ^ No Submit lectronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore 39' ft MSL 20. Thickness of Permafrost (TVD): 370' 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): MWD, GR, PHOTO-GYRO, IFRlCASANDRA, RES, PWD 22. CASING, LINER ANO CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 24" 245.6# X-56 Surface 190' Surface 190' Driven 16" 84# HCL-80 Surface 4472' Surface 3195' 21" 887 sx ASL 1906 sx Class 'G' 11-3/4" 60# S-95 Surface 16491' Surfac 7031' 14-3/4" 1801 sx LiteCrete 8 sx Class 'G' 23. Open to production or inject ion? ^Yes ®No 24. TUBING RECORD If Yes, list each interval open (MD+TVD of Top & Bottom; Perforation Size and Number): SIZE DEPTH SET MD PACKER SET MD N/A Kill Strin 4-1/2",12.ti#,13Cr80 x 2142' N/A MD TVD MD TVD L-80 x 9Cr Z5. ACID, FRACTURE, CEMENT SQUEEZE,' ETC. DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 16415' Set EZSV with 228 Bbls LiteCrete, 85 Bbls 'G' 26. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUfS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: FIOW TUbing PreSS. CaSing PreSS: CALCULATED 24-HOUR RATE OIL-BBL: GAS-McF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Core s A uired? ^Yes No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with th~i+s fDor~m++, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None S ~b JUL ~ ~ 2O~~ '~ Form 10-407 Revised 02/2007 NTINUEO ON REVERSE SIDE G 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AN ERS ENCOUNTERED): 29. FORMATION TESTS ,. NAME M TVD Well Teste ^ Yes ®No Permafrost Top 1229' 1206' If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base 1622' 1576' detailed test information per 20 AAC 25.071. Ugnu 9245' 4736' None Colville 16128' 6915' Kalubik 21955' 8744' Kuparuk 22310' 8887' Formation at Total Depth (Name): Kuparuk A 23460' 9450' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys and aLeak-Off Test Summary. 31. I hereby certify that the for oing is true and correct to the best of my knowledge. Signed Sondr "S a man Title Technical Assistant Date ~ ~ "~ ~ _ ~~ NS33 206-138 307-145 Prepared By Name/Number: Sondra Stewman, 564-4750 Well Number Permit No. / A royal No. Dolling Engineer: Skip Coyner, 564-4395 INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only ~laska k'~' ~~ . BP EXPLORATION ~` ~~~'~~ ~~~'~ N S-33 E R® Field: Northstar 12-1/4" Open Hole ENG: S. Coyner Date: April 24, 2007 Proposed P & A RIG: Nabors 33E Directional Plan: P10b RKB: 56 ft DIRILWD Mud DEPTH HOLE CASING CEMENT GENERAL FORM MWD Weight MD TVD SIZE SPECS INFO INFO 24" NONE NONE Drive None 190' 190' N/A Pipe MWD/GR 8.6 Kick Off Point 200' 200' Surface Csg 16", 84# HCN-80, BTC IFR/Cas 's ° " ' ~?'. ::7j ..~f ti5 9.3 16 Casing 4,471 3,195' ? MWD/GR PWD Top of SV-2 7,066' 4,006' Inter. Casing LSS, S-95 Hydril 563 IFR/Cas MOBM 11.1 Cemented with 11.5# LiteCrete 876 bbl / 1801 sx 2.71 cf/ sx Testa Csg to 15.8# Class G 2500 psi 114 bbl / 538 sx `c: 1.19 cf/ sx Top of Cement 16,291' 6,967 EZSV 16,391' 6,999' 140° 9.5 11314" Casing 14-3/4" Colville MWD/GR/RES FIT to 12.5 ppg IU4ls 319 bbl PWD MOBM T/Ruble Zone 16,940' 7,184' ~ Cement 1100° Excess 11.1 Bottom of CMT 17,500' 7,365' ` 70.0° 12-1 /4" Hole I I I Cap=.1458 bbl/ft I MOBM I I P & A Cement I 11.1 I a ~k8: bbls, 56~-sx IFR/Cas ~ I 12.5 ppg LiteCrete I 2.17 cf/sx I I S bls, 484-s+r Top of HRZ 21,612' 8,624' ~ 70.6° I 15.8 ppg Class G Sidetracked 21,828' 8,695' I I 1.16 cf/sx Bottom of HRZ 21,955' 8,740' I 68.0° I Top of Kuparuk D 22,310' 8,885' I I Top of Kuparuk C 22,810' 9,113' ~ 61.8° I Base of Kuparuk C 23,000' 9,202' ~ I Top of Kuparuk A 23,080' 9,240' I I 210° Open-Hole TD 23,460' 9,44T 54.2° 10-518" Bit 12-1J4" Rh ino Reamer BlKuparuk A (10/04/04] P A Well Schematic.xls g p Page 1 of 34 Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: .Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date From - To Hours ; - ~ Task ,Code NPT Phase Description of Operations 1/19/2007 04:00 - 05:00 1.00 RIGU P PRE 05:00 - 07:30 2.50 RIGU P PRE 07:30 - 09:00 1.50 RIGU P PRE 09:00 - 12:00 3.00 RIGU P PRE 12:00 - 00:00 12.00 RIGU N HMAN PRE 1/20/2007 100:00 - 05:00 I 5.001 RIGU I P I I PRE 05:00 - 16:30 11.50 RIGU P PRE 16:30 - 17:00 0.50 RIGU P PRE 17:00 - 17:30 0.50 RIGU N PRE 17:30 - 19:00 1.50 RIGU P PRE 19:00 - 21:30 2.50 RIGU P PRE 21:30 - 23:00 1.50 RIGU P PRE 23:00 - 23:30 0.50 RIGU P PRE 23:30 - 00:00 0.50 RIGU N PRE 1/21/2007 00:00 - 03:00 3.00 RIGU N RREP PRE 03:00 - 09:00 6.00 RIGU P PRE 09:00 - 12:30 3.50 RIGU N RREP PRE 12:30 - 13:30 1.00 RIGU P PRE 13:30 - 14:30 1.00 BOPSU P PRE 14:30 - 15:30 1.00 RIGU P PRE 15:30 - 16:00 0.50 RIGU P PRE 16:00 - 17:30 1.50 RIGU P PRE 17:30 - 18:00 0.50 RIGU P PRE 18:00 - 18:30 0.50 RIGU P PRE 18:30 - 20:30 2.00 RIGU P PRE 20:30 - 23:00 2.50 BOPSU P PRE 23:00 - 00:00 1.00 RIGU P PRE 1/22/2007 00:00 - 02:00 2.00 MOB P PRE 02:00 - 04:00 2.00 MOB P PRE 04:00 - 07:30 3.50 MOB P PRE 07:30 - 10:00 2.50 MOB P PRE 10:00 - 12:00 2.00 MOB P PRE 12:00 - 15:00 3.00 MOB P PRE 15:00 - 00:00 9.00 MOB P PRE 1/23/2007 100:00-03:00 03:00 - 04:00 04:00 - 19:00 19:00 - 20:00 3.00 MOB P PRE 1.001 MOB P I I PRE 15.001 MOB I P I I PRE 1.001 MOB 1 P I PRE Rig Modifications. Managing Drill Pipe, etc. Canrig technician inspected top drive Managing Drill Pipe, etc. Safety Stand Down: had meeting with crew hands to review recent near misses. Reviewing and updating procedures on PU DP from skate and operating pipe skate when PU DP. Meetings Safety Stand down as Per BP Nabors revising procedures Managing Drill Pipe & working on Rig Modifications. Managing Drill Pipe & working on Rig Modifications. Rig Repair: Repaired leak on Iron Roughneck. Managing Drill Pipe & working on Rig Modifications. Managing Drill Pipe & working on Rig Modifications. Managing Drill Pipe & working on Rig Modifications. Service Rig & Service Draworks Rig Repair: Repaired leak on Iron Roughneck. Rig Repair: Repair Iron Roughneck Rig Modifications /Manage Drill Pipe. Repair top drive and clean rig Rig Modifications /Manage Drill Pipe. Rig Modifications /Manage Drill Pipe. Rig Modifications /Manage Drill Pipe. Rig Modifications !Manage Drill Pipe. Island muster, load up in Arctos Rig Modifications /Manage Drill Pipe. PJSM with new roustabout crew coming on tour. Rig Modifications /Manage Drill Pipe. Rig Modifications /Manage Drill Pipe. Rig Modifications /Manage Drill Pipe. Nipple down spacer spool Nipple down spacer spool Nipple down spacer spool Nipple down spacer spool Nipple down spacer spool Rig Modifications /Manage Drill Pipe Rig released from NS33 at 15:00. Prepare drip pan for cut and weld to accommodate new riser, Clean under rotary table, continue to work on mud pump 3 installation, dress mud pump 3, clean and clear cellar, remove herculite, prepare rig for move, dig out utility lines for rig move Prepare rig for move, change seats and valves in #1 Mud Pump PJSM with rig crew and welders Review procedure and HACL for upcoming drip pan modifications Welding -Modifications to drip pan to recieve 24" riser Install new riser boot, Cut off conductor pipe Welding -Installation MP #3, Weld grating around rotary table Disconnect MP #3 from service module piping Raise landings in cellar, complete rig move checklist Conduct ATP w/ drilling & operations personnel PJSM w/ drilling, G & I and operations personnel for rig move Printed: 5/7/2007 11:24:17 AM ~ ~ gp Page 2 of 34 ~ Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date From - To Hours Task Code ~ NPT ~ Phase Description of Operations 1/23/2007 19:00 - 20:00 1.00 MOB P PRE Discuss responsibilities of all parties involved in the rig move 20:00 - 00:00 4.00 MOB P PRE Move rig South 50' along well row Shut-in wells & monitor flowline clearances 1/24/2007 00:00 - 02:00 2.00 MOB PRE Move rig South, Rig over NS28 - 31 Return wells to injection & production 02:00 - 05:00 3.00 MOB PRE Remove items from cellar area around NS-33 Leveling area around well cellars NS-34, NS-33, NS-32 05:00 - 00:00 19.00 MOB PRE Remove shimming & plywood from East side matting boards 1/25/2007 00:00 - 03:00 3.00 MOB P PRE 03:00 - 03:30 0.50 MOB P PRE 03:30 - 14:30 11.00 MOB P PRE 14:30 - 16:00 1.50 MOB P PRE 16:00 - 00:00 8.00 MOB P PRE 1/26/2007 100:00 - 12:00 I 12.001 MOB I P I I PRE 12:00 - 18:00 6.00 MOB P PRE 18:00 - 00:00 6.00 MOB N SFAL PRE 1/27/2007 00:00 - 12:00 12.00 MOB N SFAL PRE 12:00 - 18:00 6.00 MOB N SFAL PRE 18:00 - 00:00 I 6.001 MOB I N I SFAL I PRE 1/28/2007 ~ 00:00 - 05:00 ~ 5.00 I MOB ~ P 05:00 - 13:30 ~ 8.50 ~ MOB ~ P PRE PRE Level cellar area w/ gravel and shimming Lay matting boards over NS-35 & NS-36 well cellars Lay herculite in cellar area, Set double gate in cellar Pre-spud meeting w/ rig & support personnel Move mud pump # 3 building into final position for drilling NS-33 Spot BOPS in cellar area, Lay shimming Lay herculite & mats behind support complex PJSM for rig Move w/ drilling & operations personnel Move rig North, Shut-in wells & monitor flowline clearances Lay mats & shim as needed Center rig over NS-33 Shim support complex, Level w/ rig Berm rig, set stairs and landings Drift landing ring w/ hole opener Install air boots in drip pan /riser connector Cut to length and land 24" riser pipe Connect water, steam & air lines to MP #3 building Pre-heat & weld 24" drilling riser to wellhead adapter Weld 4" nipple for drain on riser and pad eyes for stabilization Install water, steam & air lines to MP #3 building Load pipe shed with BHA Berm around MP #3 building and rig PU 24" drilling riser and install air boot tubes, lower into place Install water, steam & air lines to MP #3 building Work to prepare mud pump #3 for service Install water, steam & air lines to MP #3 Work on installation of MP #3 Install water, steam & air lines to MP #3 building Leak on drip pan /riser air boots Remove riser, replace air boots Work on installation of MP #3 Install water, steam & air lines to MP #3 building Fill 24" riser w/ sea water, No leaks Load 16" casing in pipe shed Work on installation of MP #3 Install water, steam & air lines to MP #3 building Change to long bails, PU BHA #1 Long bails will not work on 5-7/8" Spiral HWDP Change to short bails, PU 5-7/8" Spiral HWDP PU BHA # 1, c% bales PJSM for commissioning mud pump #3 Additional work to develop start up procedure for MP #3 Review start up procedure and employee assignments Commission Mud Pump #3 Printed: 5/7/2007 11:24:17 AM • ! gp Page 3 of 34 Operations Summary Report Legal Well Name: NS33 Common W ell Name: NS33 Spud Date: 1/29/2007 Event Nam e: DRILL+C OMPLE TE Start : 1/22/2007 End: Contractor Name: NABOB S ALASK A DRI LLING I Rig Release: Rig Name: NABOB S 33E Rig Number: Date From - To Hours Task Code' NPT Phase Description of Operations 1/28/2007 05:00 - 13:30 8.50 MOB P PRE Test MP #3 for 1 hr, 100 SPM, DPP 150 psi, 428 GPM Test MP #3 & #2 for 1 hr, 100 SPM on each pump DPP 245 psi, 915 GPM Test MP #3 & #1 for 1 hr, 100 SPM on each pump DPP 230 psi, 915 GPM Test MP #1, #2 & #3 for 1 hr MP #1 70 SPM, MP #2 80 SPM, MP #3 90 SPM DPP 380 psi, 1130 GPM Pre-spud meeting w/ Coyne's crew (objectives of surface hole) Review D-7 drill (shallow gas w/o diverter) w/ Coyne's crew 13:30 - 14:30 1.00 MOB P PRE Blow down all pump lines & top drive Empty L-Pits, Pit #1 E & #1 D 14:30 - 21:00 6.50 DRILL P SURF LD 5-7/8" Spiral HW DP 15 jts Accept rig fp? 14:30 hrs on 1-28-2007 21:00 - 23:30 2.50 DRILL P SURF PJSM to RU E-Line &Gyrodata RU Schlumberger E-Line &Gyrodata equipment Spot unit, hang sheaves, MU tools 23:30 - 00:00 0.50 DRILL P SURF PU BHA #1 Pre-spud meeting w/ Langham's crew (objectives of surface hole) Review D-7 drill (shallow gas w/o diverter) w/ Langham's crew 1/29/2007 00:00 - 03:00 3.00 DRILL P SURF Clean out 24" drive pipe to 196' Drill new hole to 203', Run 21"hole opener in and out of shoe No problems 03:00 - 04:00 1.00 DRILL P SURF Run Gyro surveys in 24" drive pipe Survey depth 175' -Inclination 1.06, Azimuth 28.42 04:00 - 08:00 4.00 DRILL P SURF LD BHA #1 PU BHA #2 08:00 - 13:30 5.50 DRILL P SURF Directional drill f/ 203' to 544' taking gyro surveys on each connection Slide and rotate, DPP 540 psi C~ 575 GPM 13:30 - 14:00 0.50 DRILL P SURF Pump red mud weighted sweep Circulate BU, Shakers clean 14:00 - 16:00 2.00 DRILL P SURF POH, Wellbore packed off Work DP free, POH to BHA Hole packed off at the same time NS-32 was restarted for injection Shut-in NS-32 disposal well 16:00 - 19:30 3.50 DRILL P SURF LD BHA #2 PU BHA #3 19:30 - 20:00 0.50 DRILL P SURF RIH w/ BHA #3 to 507' 20:00 - 00:00 4.00 DRILL P SURF Wash f/ 507' to 544' Directional drill f/ 544' to 891' taking gyro surveys on each connection Slide and rotate, DPP 550 psi ~ 555 GPM, RPM 50, Torque 4K UWT 120K, DWT 110K, RWT 120K 1/30/2007 00:00 - 03:00 3.00 DRILL P SURF Directional Drill f/ 891' to 1082' Slide and rotate per directional driller 03:00 - 03:30 0.50 DRILL P SURF RD E-Line, gyro tools & equipment 03:30 - 12:00 8.50 DRILL P SURF Directional Drill f/ 1082' to 1560' Slide and rotate as per directional driller DPP 950 psi ~ 700 GPM, RPM 40, WOB 40K Printed: 5/7/2007 11:24:17 AM x ~ ~ BP Operations Summary Report Page 4 of 34 ~ Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date i From - To Hours Task ~ Code, NPT Phase Description of Operations i 1/30/2007 ~ 12:00 - 00:00 ~ 12.00 DRILL ~ P ~ ~ SURF Directional Drill f/ 1560' to 2513' 1/31/2007 100:00 - 04:00 4.00 ~ DRILL P SURF 04:00 - 05:30 I 1.501 DRILL I N I RREP I SURF 05:30 - 12:00 6.501 DRILL P SURF 12:00 - 00:00 I 12.001 DRILL I P I I SURF 2/1/2007 100:00 - 01:00 1.00 DRILL N RREP SURF 01:00 - 06:30 I 5.501 DRILL I P I I SURF 06:30 - 10:30 I 4.001 DRILL I P I I SURF 10:30 - 20:00 I 9.501 DRILL I P I I SURF 20:00 - 00:00 4.00 DRILL P SURF 2/2/2007 00:00 - 02:00 2.00 DRILL P SURF 02:00 - 04:30 I 2.501 DRILL I P I I SURF Slide and rotate as per directional driller Back ream each stand, High side back to bottom DPP 1150 psi C~ 800 GPM, RPM 40, WOB 40K, Torque 7K UWT 130K, DWT 110K, RWT 130K Directional Drill f/ 2513' to 2799' Slide and rotate as per directional driller Back ream each stand, High side back to bottom DPP 1300 psi ~ 800 GPM, RPM 40, WOB 15 - 30K, Torque 7K UWT 150K, DWT 120K Mud pump #1 -Liner & swab cut out Mud pump #3 was having 6.5" liners installed when pump #1 failed Circulate w/mud pump #2 Directional Drill f/ 2799' to 3179' Slide and rotate as per directional driller Back ream each stand, High side back to bottom DPP 1450 psi C~3 800 GPM, RPM 40, WOB 15 - 20K, Torque 8 - 12K UWT 150K, DWT 120K, RWT 135K Directional Drill f/ 3179' to 4140' Slide and rotate as per directional driller Back ream each stand, High side back to bottom DPP 1580 psi C~3 840 GPM, RPM 40, WOB 15 - 20K, Torque 10 - 15K UWT 150K, DWT 110K, RWT 140K Troubleshoot top drive w/ Canrig rep. Small hydraulic oil leak on top drive Wipe down top drive w/ absorbent pads Found and tightened two hydraulic hose fittings Directional Drill f/ 4140' to 4487' Slide and rotate as per directional driller Back ream each stand, High side back to bottom DPP 1650 psi ~ 850 GPM, RPM 80, WOB 15 - 20K, Torque 10 - 12K UWT 170K, DWT 90K, RWT 150K Circulate BU, DPP 1585 C~2 830 GPM, 90 RPM, Reciprocate 60' Pump 80 bbl red mud weighted sweep, 12.3 ppg, 250 vis Pump 2nd 80 bbl red mud weighted sweep, 12.3 ppg, 250 vis Circulate 3x BU, DPP 2080 ~ 1060 GPM, 90 RPM, Reciprocate 60' POH 5 stands, monitor hole fill, check flow, pump dry job Blow down top drive & all mud pumps POH f/ 4487' to 218' Hole pulled 20K over in several spots, work down 30' Pull back up through tight spot with no over pull LD BHA #3 Remove all BHA #3 components from rig floor Remove clay from rig floor that was stuck on BHA Clean rig floor PJSM, Cut drilling line Printed: 5/7/2007 11:24:17 AM ~; BP Opera#"rons Summary Report Page 5 of 34 ~ Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: i Date .From - To Hours Task Code NPT Phase I Description of Operations 2/2/2007 04:30 - 08:00 3.50 DRILL P SURF PU BHA #4 - 21"hole opener assembly 08:00 - 15:00 7.00 DRILL P SURF Open 16" hole to 21" hole f/ 200' to 1730' 15:00 - 16:00 1.00 DRILL P SURF 16:00 - 17:30 1.50 DRILL N RREP SURF 17:30 - 20:30 3.00 DRILL P SURF 20:30 - 21:30 I 1.00) DRILL I P I I SURF 21:30 - 00:00 I 2.501 DRILL I P I I SURF 2/3/2007 100:00 - 10:00 I 10.001 DRILL I P SURF 10:00 - 15:00 I 5.001 DRILL I P I I SURF 15:00 - 15:30 0.50 DRILL P SURF 15:30 - 22:00 6.50 DRILL P SURF 22:00 - 00:00 2.00 DRILL P SURF 2/4/2007 00:00 - 02:00 2.00 DRILL P SURF 02:00 - 03:00 1.00 DRILL P SURF 03:00 - 09:00 6.00 CASE P SURF 09:00 - 00:00 I 15.001 CASE I P I I SURF 2/5/2007 100:00 - 07:00 I 7.001 CASE I P I I SURF 07:00 - 19:00 I 12.001 CASE I N I DPRB I SURF DPP 670 psi ~ 750 GPM, 80 RPM, WOB 5-20K, Torque 8-12K Work dog leg ~ 1200' Circulate BU Replace wash pipe assembly & packing on top drive Clean suction screens on mud pumps #1 & #2 Open 16" hole to 21"hole f/ 1730' to 2300' DPP 975 psi ~ 900 GPM, 80 RPM, WOB 20-30K, Torque 10-12K Swab failure on mud pump #2 Bring on mud pump #3, pump not getting fluid Clean suction screens on mud pump #3 Open 16" hole to 21" hole f/ 2300' to 2781' DPP 975 psi ~ 900 GPM, 80 RPM, WOB 20-30K, Torque 10-12K Open 16" hole to 21"hole f/ 2781' to 4483' DPP 1050 psi ~ 920 GPM, 80 RPM, WOB 20-30K, Torque 9 -16K Circulate, clean wellbore to run 16" casing DPP 1380 psi @ 1000 GPM, 120 RPM, Reciprocate 77' Pump 80 bbl hi-vis 12.0 ppg weighted sweep Followed by 150 bbl red mud sweep - 250 vis Significant increase in cuttings as sweeps returned Circulate until hole cleaned up Island muster drill Monitor well, no flow, prepare to trip TOH f/ 4483' to BHA, Hole pulled 20-30 over in a few places Most of the trip overpull was 5 -15K Made precautionary pass f/ 1170' to 1290', No problems SLM on trip out, no corrections LD BHA # 4 LD BHA #4 Clear BHA components from rig floor Clean rig floor PJSM, Review RU Protocol, Plan Job RU equipment to run 16" casing Had to modify VLE on rig to lift casing tongs Run 16", 84#, HCL-80, BT&C Casing All equipment on first two joints are Baker-locked Pump through and check float equipment RIH w/ 16" casing, tag up ~ 211' Work casing down f/ 211' to 755' Run casing f/ 755' to 2380' Circulate ~ various depths as conditions dictate Recording PU & SO weights every 500' Run 16", 84#, HCL-80, BT&C Casing Run 16" casing f/ 2380' to 3505' Circutate down C~3 various depths as conditions dictate Circulation rate 400 GPM C~? 670 psi Recording PU & SO weights every 500' -Set down on ledge ~ 3505', UWT 320K Printed: 5/7/2007 11:24:17 AM BP Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 33E I Date From - To j Hours j Task j Code NPT - - ~ -- _ ~ Start: 1 /22/2007 Rig Release: Rig Number: Phase 2/5/2007 07:00 - 19:00 I 12.00 I CASE I N I DPRB I SURF 19:00 - 22:00 I 3.001 CASE I N I DPRB I SURF 22:00 - 23:30 I 1.50 I CASE I P I I SURF 23:30 - 00:00 ~ 0.50 ~ CASE ~ P ~ ~ SURF 2/6/2007 100:00 - 02:00 2.001 CASE P I SURF 02:00 - 08:00 I 6.001 CASE I P I I SURF 08:00 - 12:00 I 4.001 CASE I P I I SURF 12:00 - 15:30 3.50 CASE P SURF 15:30 - 16:30 1.00 CASE P SURF 16:30 - 17:30 1.00 CASE P SURF 17:30 - 22:00 4.50 CASE P SURF 22:00 - 00:00 2.00 CASE P SURF 2/7/2007 00:00 - 01:00 1.00 CASE P SURF 01:00 - 05:30 I 4.501 CEMT I P I I SURF 05:30 - 09:30 4.00 CEMT P SURF 09:30 - 12:00 2.50 CEMT P SURF Page 6 of 34 I Spud Date: 1/29/2007 End: Description of Operations - Decision made to POH w/ casing. PJSM -Clear pipeshed of remaining 16" casing and prepare for Tuboscope to inspect casing as it is being UD. UD 1 jt of casing. POH w/ jt # 2 and hang up on casing collar at conductor shoe. Work pipe to attempt to pull free off of collar without success. -Work through ledge @ 3505' to 3506', Broke through ~ 3506' - RIH to 3519', DWT 180K, UWT 315K Circulate wellbore ~ 420 GPM - 675 psi Reciprocate 15', DWT 180K, UWT 315K Load pipe shed w/ casing, tally & drift all joints Remove coupling from an extra joint of casing Clear & clean rig floor LD joint # 85 -pin damaged after breaking out Remove casing collar from jt #84 -collar damaged Tuboscope inspected extra collar, pin on jt # 84 -both OK Make up collar on pin w/ chain tongs PU joint of 16" casing & make up w! casing tongs Both joint above & below the collar made up to triangle Wash joint of casing to 3543', DPP 640 psi ~ 400 GPM UWT 320K, DWT 180K Run 16" casing f/ 3543' to 3881' Wash casing down w/ DPP 620 psi ~ 420 GPM Depth 3585' -DWT 180K Depth 3725' -DWT 175K Depth 3857' -DWT 170K Set down on bridge or ledge ~ 3881' Circulate/work through bridge ~ 3881', UWT 335K, DWT 170K DPP 620 psi ~ 440 GPM, No progress Cont. working pipe through ledge until cleared same ~ 3890' Cont. running casing f/ 3890' to 4425'. Make up hanger and landing joint. Attemtpted to seat hanger. Attempted to seat hanger and land casing unsuccessfully. ND riser section and landed casing. Verified visually. NU riser. 16" shoe (~ 4471'. 16" float collar ~ 4427' Circulate 1 BU. LD landing joint RD Franks fill up tool. Blew down top drive and lines. RD and removed casing running equipment from rig floor. Clean rig floor and prepared to run 5" DP inner string Service top drive. Changed 500 ton bails to 350 ton bails. RU 5" DP elevators. Changed saver sub XT-57 to 4-1/2 IF Finished changing saver sub XT-57 to 4-1/2 IF and preparing to run 5" DP inner string MU stinger. RIH on 5" DP to 4427'. Took PU 135 K; SO 105 K. Break circulation and chek pressures: 2 BPM ~ 110 psi ; 6 BPM ~ 160 psi; 10 BPM @ 310 psi. Tag landing collar w/stinger ~ 4427' and slack off 30 K on stinger. Staged pumps and verified circulation through 24" x 16" annulus. Circulating and conditioning mud prior to cementing 16" casing RU cement head. Test primary and back up cement pump. Pump 10 bbls sea water and test lines to 2000 psi. Bleed off pressure and change out leaking valve on cement tee & retest Printed: 5/7/2007 11:24:17 AM f • gp Page 7 of 3~ Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date ~ From - To j Hours Task Code NPT Phase Description of Operations 2/7/2007 09:30 - 12:00 2.50 CEMT P SURF to 2000 psi. Bleed off pressure and change out leaking valve on cement tee and retest to 2000 psi. OK. 12:00 - 18:30 6.50 CEMT P SURF Cemented 16" casing: pumped 100 bbls 10.3 ppg Mud Push followed by 10.7 ppg lead cement. After pumping 790 bbls of lead cement switched to 15.8 ppg tail cement, after observing 100% lead cement returns on surface. Pumped 404 bbls of 15.8 ppg tail cement, dropped wiper dart and displaced w/ 83.4 bbls of sea water.(string volume and 1/2 shoe track-did not latch dart) All pumping done w/Schlumberger pumps. Stopped pumping and held final pressure (1650 psi) for 2 min. Bleed off pressure and check floats, and floats holding. Unsting from float collar. Checked well and floats, OK. Wash up and blow down lines. Returns of cement to surface: approx. 500 bbis. 18:30 - 20:00 1.50 CEMT P SURF Circulate BU down 5" DP inner string C~ 12 BPM 20:00 - 21:00 1.00 CEMT P SURF Flushed riser. Break out and LD cement head and cement lines. 21:00 - 00:00 3.00 CEMT P SURF POOH and LD 1 x 1 5" DP inner string. 2/8/2007 00:00 - 03:30 3.50 CEMT P SURF Cont. POOH and LD 1 x 1 5" DP inner string. Break stinger. 03:30 - 08:30 5.00 BOPSU P SURF PuII Roughneck Track and Master bushings. Cleaned under rotary table. Evacuate mud from riser. Cut and grind off pad eyes for turn buckles prior to pulling riser to rig floor. Cut 24" riser and pull to rig floor. LD riser 08:30 - 14:00 5.50 BOPSU P SURF Clean cement off 16" casing. Cut 16" casing, pull to rig floor and LD. Remove riser to condutor flange. Prepared stump as per Vetco rep. 14:00 - 21:00 7.00 BOPSU P SURF PJSM on cellar lifting operations. Place adapter flange in cellar. Trouble shoot and repaired bridge crane hydraulic power loss. Cut metal from cellar box area to allow positioning of casing spool and drl sweep. Install casing spool /adapter flange 24" x 16-3/4". Set test plug. Test lock seal to 1500 psi. OK. 21:00 - 00:00 3.00 BOPSU P SURF Remove BOP scaffolding to lift 16-3/4" BOP. Place 16-3/4" single gate BOP box in cellar 2/9/2007 00:00 - 18:00 18.00 BOPSU P SURF NU 16-3/4" 5000 psi BOP, bulding stack component by component. Prepare and secure riser. Weld flange and riser section 18:00 - 00:00 6.00 BOPSU P SURF Install riser section. Begin torquing BOP. Remove 5" ODS derrick fingers and install 5-7/8" fingers. Remove 4-1/2 IF saver sub from top drive. 2/10/2007 00:00 - 11:30 11.50 BOPSU P SURF Cont. torquing BOP. Install fittings for hydraulic hoses on BOP. Service top drive. Install 5-7/8 XT-57 saver sub on top drive 11:30 - 12:00 0.50 BOPSU P SURF Held pre-spud meeting for 14-3/4" hole section with both Steve Beard's and Rick Dolfi's crews. 12:00 - 15:00 3.00 BOPSU P SURF Cont. torquing BOP. Install koomey lines and mouse hole. Installing choke line 15:00 - 15:30 0.50 DRILL P SURF Pull test plug and install wear bushing 15:30 - 16:30 1.00 DRILL P SURF RU a-line and gyro tool. 16:30 - 22:00 5.50 DRILL P SURF RIH and take gyro surreys on a-line to 4400'. POOH. Finish installing choke line 22:00 - 23:00 1.00 DRILL P SURF RD a-line and gyro tool 23:00 - 00:00 1.00 DRILL P SURF Changing bails and elevators 2/11/2007 00:00 - 05:00 5.00 DRILL P SURF Change bails and elevators. Service drawworks. Function tested BOP and redo koomey lines. Printetl: 5/7/2007 11:24:17 AM gp Page 8 of 34 Operations Summary Report Legal Well Name: NS33 Common W ell Name: NS33 Spud Date: 1/29/2007 Event Nam e: DRILL+C OMPLE TE Start : 1/22/2007 End: Contractor Name: NABOR S ALASK A DRI LLING I Rig Release: Rig Name: NABOR S 33E Rig Number: Date From - To Hours j 1 Task Code NPT Phase ~ Description of Operations 2/11/2007 05:00 - 06:00 1.00 BOPSU P SURF Put gel on upper riser 06:00 - 09:30 3.50 DRILL P SURF MU mule shoe and RIH w/ 27 stands 5-7/8" DP from the derrick 09:30 - 10:30 1.00 DRILL P SURF Fill stack and riser with water and check for leaks 10:30 - 12:00 1.50 DRILL P SURF PU slick 5-7/8" DP 1 x 1 from pipe shed and run in hole 12:00 - 12:30 0.50 DRILL P SURF Review PU drill pipe and skate operating procedures with crew coming on tour 12:30 - 18:00 5.50 DRILL P SURF Building stands of slick 5-7/8" DP: PU 1 x 1 from shed and POOH, racking back on DS and ODS as per plan. 18:00 - 18:30 0.50 DRILL P SURF Review PU drill pipe and skate operating procedures with roustabouts coming on tour 18:30 - 00:00 5.50 DRILL P SURF Cont. building stands of slick 5-7/8" DP and combination w/ 5-7/8" Hydroclean DP, picking up 1 x 1 and racking back in DS and ODS as per plan. 2/12/2007 00:00 - 00:30 0.50 DRILL P SURF Reviewed procedures on PU DP from pipe shed with crew coming on tour and roustabouts on tour 00:30 - 03:30 3.00 DRILL P SURF Cont, building stands of 5-7/8" DP and Hydroclean DP, PU 1 x 1 from pipe shed and racking back on derrick 03:30 - 07:30 4.00 DRILL P SURF PU last group of 5-7/8" DP and Hydroclean DP 1 x 1 from pipe shed and RIH. Tag float collar at 4427' 07:30 - 11:00 3.50 DRILL P SURF Circulate and displace well to 8.8 ppg LSND mud. Blow down lines. 11:00 - 13:30 2.50 DRILL P SURF POOH and rack back stands of 5-7/8" DP and Hydroclean DP to 3826' 13:30 - 15:00 1.50 DRILL N RREP SURF Repair leaking top drive tube oil filter. Adjust handler lock bypass fault sensor on top drive 15:00 - 18:00 3.00 DRILL P SURF Cont. POOH and rack back stands of 5-7/8" DP and Hydroclean DP to surface. Break mule shoe. Clear rig floor 18:00 - 19:00 1.00 BOPSU P SURF Pull wear bushing and install test plug 19:00 - 20:00 1.00 BOPSU P SURF PU and MU test joint, TIW and dart valve. RU to test BOP. Fill choke manifold and stack 20:00 - 00:00 4.00 BOPSU P SURF Testing BOP and related equipment to 250 / 2500 psi per BP / AOGCC regulations. Test witnessed by WSL (Chacin) and Tourpusher (Ashley). Chuck Sheve, AOGCC Inspector, waived witness of test 2/13/2007 00:00 - 03:30 3.50 BOPSU P SURF Test BOP and related equipment to 250 / 2500 psi per BP / AOGCC regulations. Test witnessed by WSL (Chacin / Rocket) and Tourpusher (Ashley). Chuck Sheve, AOGCC Inspector, waived witness of test 03:30 - 04:00 0.50 BOPSU P SURF Pull test plug. Install wear bushing 04:00 - 05:00 1.00 BOPSU P SURF LD test joint. Blow down top drive and all mud lines. 05:00 - 07:00 2.00 DRILL P SURF PU and MU BHA #5 07:00 - 07:30 0.50 DRILL P SURF Shallow test tools 07:30 - 11:30 4.00 DRILL P SURF Cont. PU and MU BHA #5. Clear rig floor 11:30 - 21:30 10.00 DRILL P SURF RIH / PU 5-78" DP /Hydroclean DP 1x1 from pipe shed to float collar. 21:30 - 00:00 2.50 DRILL P SURF Cut and slip drilling line 2/14/2007 00:00 - 00:30 0.50 DRILL P SURF Finish cut and slip drilling line 00:30 - 01:30 1.00 DRILL P SURF PJSM on casing test using pump #3. Filled mud lines to pump #3 01:30 - 03:00 1.50 CASE P SURF Test 16" casing to 2500 psi and hold pressure for 30 min (used pump #3 for test). Record test on chart recorder. Blow down lines to pump #3 and kill line Printed: 5/7/2007 11:24:17 AM • ~ BP Operations Summary Report Page9of34~ Legal Well Name: NS33 Common We!! Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date ' From - To Hours Task ~ Code ! NPT - - ---j __ 2/14/2007 03:00 - 06:00 3.00 DRILL P 06:00 - 07:00 1.00 DRILL P 07:00 - 07:30 0.50 DRILL P 07:30 - 12:00 4.501 DRILL ~ P 12:00 - 22:00 I 10.00 ~ DRILL I P 22:30 - 00:00 ~ 0.50 DRILL P 2/15/2007 100:00 - 06:30 I 6.50 ~ DRILL I P 06:30 - 07:00 0.50 DRILL P 07:00 - 12;00 5.00 DRILL P 12:00 - 23:30 11.501 DRILL P 23:30 - 00:00 0.50 DRILL P 2/16/2007 00:00 - 12:00 12.00 DRILL P 12:00 - 00:00 I 12.00 I DRILL I P 2/17/2007 00:00 - 00:30 0.50 DRILL P 00:30 - 06:30 6.00 DRILL P 06:30 -12:30 6.00 DRILL P 12:30 - 15:00 2.50 DRILL P 15:00 - 17:00 2.00 DRILL P 17:00 - 19:00 2.00 DRILL P 19:00 - 22:30 3.50 DRILL P 22:30 - 23:30 1.00 DRILL P 23:30 - 00:00 0.50 DRILL P 2/18/2007 00:00 - 01:00 1.00 DRILL P 01:00 - 05:30 4.50 DRILL P 05:30 - 12:00 6.50 DRILL P 12:00 - 00:00 12.00 DRILL P Phase Description of Operations SURF Drill out shoe track and drill 20' of new hole to 4507' SURF Pull to the shoe and circulate bottoms up SURF Perform Formation Integrity Test (FIT) to 11.5 EMW. Blow down kill line INT1 Set drilling parameters. Dir. drill from 4507' to 4802'. 940 gpm 1500 psi. TO on: 9-10k, TO off: 6.5k, PU: 162k, SO: 125k, rot weight: 152k. RPM: 130. WOB: 8-10k INT1 Dir. drill from 4802' to 5700'. 953 gpm @ 1730 psi. TO on: 14-16k, TO off: 9.Ok, PU: 185k, SO: 142k, rot weight: 155k. RPM: 160. WOB:10k INT1 Service Top Drive INT1 Dir. drill form 5700' to 5849'. 953 gpm ~ t 730 psi. TO on: 14-16k, TO off: 10.Ok, PU: 190k, SO: 138k, rot weight: 160k. RPM: 160. WOB:8-10k INT1 Dir. drill from 5849' to 6422'. 965 gpm ~ 1730 psi. TO on: 16k, TO off: 10.Ok, PU: 190k, SO: 141 k, rot weight: 160k. RPM: 160. W06:8-10k INT1 Service top drive and drawworks INT1 Dir. drill from 6422' to 6827'. 961 gpm ~ 1515 psi. TO on: 18-20k, TO off: 11.Ok, PU: 190k, SO: 145k, rot weight: 162k. RPM: 160. WOB: 10-12k INT1 Dir. drill from 6827' to 7665'. 982 gpm @ 1780 psi. TO on: 15-17k, TQ off: 11.Ok, PU: 200k, SO: 145k, rot weight: 170k. RPM: 160. WOB:10k INT1 Service top drive INT1 Dir. drill from 7665' to 8728'. 982 gpm ~ 1830 psi. TO on: 21-23k, TO off: 15.5k, PU: 223k, SO: 162k, rot weight: 185k. RPM: 160. WOB:20-25k INT1 Dir. drill from 8728' to 9786'. 986 gpm ~ 1980 psi. TO on: 23-26k, TO oft: 19k, PU: 240k, SO: 150k, rot weight: 180k. RPM: 160. WOB: 10-12k INTi Service top drive and drawworks INT1 Dir. drill from 9786' to 10362'. 978 gpm ~ 1980 psi. TO on: 25-27k, TO off: 20k, PU: 250k, SO: 152k, rot weight: 190k. RPM: 160. WOB: 12k INT1 Circulate 4 BU. Pulled and racked one stand every BU. INTi POOH to 9100'. Pump dry job. Blow down top drive and mud lines INT1 Cont. POOH to 7376'. Observed PU hook load 245K C~? 7500'. INT1 RIH w/ 3 stand to 7664'. Circulate hole clean ~ 950 gpm and 140 rpm. INT1 POOH from 7664' to 16" shoe. INT1 Clean rig floor and work area. INT1 Service top drive INTi Service drawworks. Adjust link tilt INT1 RIH from 16" shoe to 10241'. Fill pipe at 7376' and 9382'. Wash last two stands to 10362' INT1 Dir. drill from 10362' to 10764'. 965 gpm ~ 1980 psi. TO on: 29k, TO off: 22k, PU: 265k, SO: 155k, rot weight: 200k. RPM: 160. WOB:15k INT1 Dir. drill from 10764' to 11658'. 965 gpm ~ 2500 psi. TO on: 29-31 k, TO off: 25k, PU: 280k, SO: 160k, rot weight: 210k. RPM: 160. W0B:15k Printed: 5/7/2007 11:24:17 AM • BP Page 10 of 34 ~ Operations Summary Report Legal Well Name: NS33 'Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date ~ From - To ~ Hours ~ Task ~ Code I NPT Phase ~ Description of Operations 2/19/2007 00:00 - 00:30 0.50 DRILL P INTi Service Top Drive 00:30 - 10:00 9.50 DRILL P INT1 Dir. drill from 11658' to 12179'. 980 gpm Q 2170 psi. TQ on: 10:00 - 18:30 I 8.501 DRILL I N I DFAL I INT1 18:30 - 20:00 1.50 DRILL N DFAL INT1 20:00 - 23:30 3.50 DRILL N DFAL INTi 23:30 - 00:00 0.50 DRILL N DFAL INT1 2/20/2007 00:00 - 00:30 0.50 DRILL N DFAL INTi 00:30 - 01:30 1.00 DRILL N DFAL INT1 01:30 - 03:00 1.50 DRILL N DFAL INT1 03:00 - 06:00 3.00 DRILL N DFAL INT1 06:00 - 08:00 2.00 DRILL N DFAL INT1 08:00 - 10:30 2.50 DRILL N DFAL INT7 10:30 - 11:00 0.50 DRILL N DFAL INT1 11:00 - 17:00 6.00 DRILL N DFAL INT1 17:00 - 23:00 I 6.001 DRILL I N I DFAL I INT1 23:00 - 00:00 1.00 DRILL N DFAL INT1 2/21/2007 00:00 - 02:00 2.00 BOPSU N DFAL INT1 02:00 - 02:30 0.50 BOPSU N SFAL INT1 02:30 - 06:00 3.50 BOPSU N DFAL INT1 06:00 - 06:30 0.50 BOPSU N DFAL INT1 06:30 - 10:00 3.50 BOPSU N DFAL INT1 10:00 - 11:00 1.00 DRILL N DFAL INT1 11:00 - 13:00 2.00 BOPSU N SFAL INT1 13:00 - 14:00 1.00 BOPSU N DFAL INT1 27-30k, TO off: 25k, PU: 290k, SO: 160k, rot weight: 210k. RPM: 160. WOB: 15k. Power Drive tool not responding to settings. Circulate 4x BU until hole clean, while rotating pipe ~ 160 rpm. Reacked back 1 stand every BU. POOH to 11098'. Had 40K overpull over trend. RIH 3 stands to 11385'. Circulate 2x BU until hole clean, while rotating pipe ~ 160 rpm POOH to 10814'. Pump dry job. Monitor well POOH f/ 10814' to 10280'. Overpull 40K RIH to 10622'. Circulate BU. Hole clean POOH to 10280'. Overpull 40K, Rotate through w/one stand RIH w/ 1 stand, Pull through w/o rotation. No overpull, POOH to 9171' POOH to 9171', 40K overpull, RIH w/ 1 stand Circulate 30 minutes, still at 40K overpull Backream f/ 9171' to 9096', POH f/ 9096' to 6000', Overpull is normal 10 - 15K Pump dry job, monitor well POOH f/ 6000' to 16" casing shoe ~ 4471' Monitor well for 15 minutes POOH f/ 4471' to BHA, Monitor well for 15 minutes LD BHA #5 Bit graded - 2 3 2, bit was 1/8" undergauge Bias unit- all three seals had failed Bias unit -significant wear on pads, not enough to cause performance issues Receiver stabilizer sub - 11.50", extreme wear Both NM stabilizers - 12.125", significant wear Ghost reamer - 14.75", good condition Clear & clean rig floor Pull wear bushing, drain BOP stack MU test joint, install test plug Wear bushing in good condition Thaw ice plug in choke line Blow down choke line after ice plug cleared Test BOPE, Test to 250 psi / 2500 psi as per NS-33 Drilling Permit BOP test witnessed by AOGCC Rep. John Crisp, BP Rep. Joey LeBlanc Pull test plug, LD test joint Drain BOP stack Thaw ice plugs in kill & choke lines Blow down kill & choke lines after ice plugs cleared Clear rig floor of BHA components Clean rig floor Replace saver sub & IBOP valve Saver sub had bad threads Test BOPE, Test to 250 psi / 2500 psi as per NS-33 Drilling Permit Printed: 5/7/2007 11:24:17 AM gp Page 11 of 34 ~ Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date From - To ~ Hours ~ Task ~ Code ( NPT~ Phase ~ Description of Operations 2/21/2007 113:00- 14:00 1.00 BOPSUFIN 14:00 - 18:00 I 4.001 BOPSUAN 18:00 - 18:30 0.50 DRILL N 18:30 - 00:00 5.50 DRILL N 2/22/2007 100:00 - 02:30 I 2.501 DRILL I N 02:30 - 06:00 I 3.501 DRILL I N 06:00 - 09:30 I 3.50 DRILL P 09:30 - 16:00 6.50 DRILL N 16:00 - 18:30 2.501 DRILL I N 18:30 - 00:00 I 5.501 DRILL I P 2/23/2007 100:00 - 12:00 I 12.001 DRILL I P 12:00 - 17:00 5.00 DRILL P 17:00 - 18:00 I 1.001 DRILL I P 18:00 - 00:00 I 6.001 DRILL I P 2/24/2007 100:00 - i 1:30 I 11.501 DRILL I P DFAL INT1 (BOP test witnessed by AOGCC Rep. John Crisp, BP Rep. John Rall DFAL INT1 Work to install wear bushing, could not get bushing through annular Function annular on 5 7/8" DP, Install wear bushing DFAL INTt Service top drive DFAL INT1 PU BHA #6, Shallow test tools ~ 605 GPM -DPP 650 psi Blow down all mud lines DFAL INT1 PU BHA #6 Change elevators to 5 7/8" DFAL INT1 TIH w/ 5 7/8" DP to 4419' Fill drill pipe every 20 stands INT1 Cut & slip drilling line DFAL INT1 TIH w/ 5 7/8" DP f/ 4419' to 10857' Tight spot @ 10857', Ream f/ 10857' to 11020' TIH f/ 11020' to 11919' DFAL INT1 Stage pumps to 950 GPM C°? 2280 psi Wash to bottom f/ 11919' to 12179' Obtain baseline ECD - 9.85 ppg Send directional commands to tools INT1 Drill w/ rotary steerable f/ 12179' to 12336' DPP 2170 psi C~ 950 GPM RPM 90 - 160, WOB 10 - 25K, Torque ON-29K, OFF-24K UWT-290K, DWT-160K, RWT-210K SPR - MD 12243', TVD 5697', Mud Wt 9.3 ppg SPR#1 - 30 SPM 270 psi, 40 SPM 290 psi SPR#2 - 30 SPM 250 psi, 40 SPM 290 psi INT1 Drill w/ rotary steerable f/ 12336' to 13098' DPP 2110 psi C~ 932 GPM RPM 160, WOB 15 - 25K, Torque ON-37K UWT-300K, DWT-162K, RWT-215K SPR - MD 12432', TVD 5755', Mud Wt 9.4 ppg SPR#1 - 30 SPM 260 psi, 40 SPM 300 psi SPR#2 - 30 SPM 260 psi, 40 SPM 300 psi INTi Drill w/ rotary steerable f/ 13098' to 13580' DPP 2160 psi ~ 932 GPM RPM 160, WOB 15 - 25K, Torque ON-40K INT1 Monitor ECD and DPP Circulate & monitor drill string & wellbore conditions INT1 Drill w/ rotary steerable f/ 13580' to 13917' DPP 2230 psi ~ 930 GPM, Calculated ECD 9.98 ppg RPM 160, WOB 15 - 20K, Torque ON-40K, Torque OFF-29K UWT-300K, DWT-165K, RWT-220K SPR - MD 13773', TVD 6168', Mud Wt 9.5 ppg SPR#1 - 30 SPM 350 psi, 40 SPM 390 psi SPR#2 - 30 SPM 350 psi, 40 SPM 390 psi INT1 Drill w/ rotary steerable f/ 13917' to 14737' DPP 2335 psi ~ 940 GPM RPM 130, WOB 10 - 18K, Torque ON-43K UWT-325K, DWT-165K, RWT-245K SPR - MD 14736', TVD 6471', Mud Wt 9.4 ppg SPR#1 - 30 SPM 440 psi, 40 SPM 480 psi SPR#2 - 30 SPM 440 psi, 40 SPM 480 psi Printed: 5/7/2007 11:24:17 AM v gp Page 12 of 34 ~ Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date ~ From - To j Hours Task Code ! NPT Phase ~ Description of Operations 2/24/2007 11:30 - 12:00 ~ 0.50 ~ DRILL P ~ INTi Circulate to move cuttings uphole 12:00 - 00:00 I 12.001 DRILL I P I I INT1 2/25/2007 100:00 - 13:30 I 13.501 DRILL I P ! I INT1 13:30 - 15:00 I 1.501 DRILL I N I DFAL I INT1 15:00 - 00:00 I 9.001 DRILL I N I DFAL I INT1 2/26/2007 100:00 - 12:00 I 12.001 DRILL I N I DFAL I INT1 12:00 - 13:30 I 1,50 I DRILL I N I DFAL I INT1 13:30 - 18:30 1 5.001 DRILL I N I DFAL 1 INT1 18:30 - 00:00 I 5.50) DRILL I N I DFAL I INTi 2/27!2007 100:00 - 01:00 ~ 1.001 DRILL N I DFAL INT1 01:00 - 02:00 I 1.001 DRILL I N I DFAL I INTi 02:00 - 03:00 1.00 DRILL N DFAL INT1 03:00 - 07:00 4.00 DRILL N DFAL INT1 DPP 2335 psi @ 940 GPM, RPM 142 UWT-305K, DWT-165K, RWT-230K Drill w/ rotary steerable f/ 14737' to 15372' DPP 2260 psi ~ 930 GPM, Calculated ECD 10.08 ppg RPM 120, WOB 10 - 18K, Torque ON-40K, Torque OFF-34K UWT-325K, DWT-165K, RWT-230K SPR - MD 15216', TVD 6624', Mud Wt 9.4 ppg SPR#1 - 30 SPM 460 psi, 40 SPM 470 psi SPR#2 - 30 SPM 450 psi, 40 SPM 480 psi Drill wf rotary steerable f/ 15372' to 16449' DPP 2300 psi Cad 930 GPM RPM 120, WOB 10 - 18K, Torque ON-43K, Torque OFF-37K UWT-330K, DWT-160K, RWT-225K SPR - MD 16279', TVD 6987', Mud Wt 9.4 ppg SPR#1 - 30 SPM 450 psi, 40 SPM 500 psi SPR#2 - 30 SPM 450 psi, 40 SPM 500 psi 250 psi pressure drop Pressure test pumps, lines, all surface equipment - OK Check suction & discharge screens - no problems Blow down lines, Monitor well - wel{ static Prepare to TOH looking for washout TOH looking for washout f/ 16449' to 11619' Pulled 50 stands, Circulate 5 minutes ~ 11619' DPP 1720 psi ~ 930 GPM, MWD turbine RPM 2344 Leak not in first 50 stands pulled TOH looking for washout f/ 11619' to 10336' TOH looking for washout f/ 10336' to 4228' Work through tight spots w/ 40-60K overpull Tight spot depths: 9750', 9175', 6327', 5695', 4850', 4813' Back ream f/ 4727' to 4702', RPM 40, Torque 15K DPP 200 psi ~ 200 GPM Test f/ washout @ 4471', 950 GPM ~ 1150 psi DPP Turbine RPM 2380, Washout is not in DP stood back Blow down top drive, monitor well Cat 4471' -well static TOH f/ 4471' to 4228' Well U-tubing up drill pipe Cad 4228' Pump 130 bbls ~ 300 GPM -DPP 230 psi Well still U-tubing, Pump dry job Blow down lines, monitor well ~ 4228' -well static TOH looking for washout f/ 4228' to string stabilizer LD string stabilizer, string stabilizer 1/16" under gauge TOH to BHA, No leaks found in drill pipe LD BHA #6 Found washout & cracked box on 8" NM drill collar Box cracked over 1/2 way around, LD bad DC Top stabilizer 13 7/8", Middle stabilizer 13 1/4" LD BHA #6 Near bit stabilizer 14", Bit 1/16" under gauge Clear & clean rig floor Remove BHA components from rig floor Service top drive & blocks PU BHA #7 Printed: 5/7/2007 11:24:17 AM gp Page 13 of 34 ~ Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPL ETE Start: 1/22/2007 End: Contractor Name: NABOBS ALAS KA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date From - To Hours ~ Task 'Code NPT Phase ~ Description of Operations 2/27/2007 07:00 - 10:00 3.00 DRILL N DFAL INT1 TIH to 4435' filling pipe every 20 stands 10:00 - 13:00 3.00 DRILL N DFAL INT1 PJSM, Cut & slip drilling line Function test crown-o-matic 13:00 - 13:30 0.50 DRILL N DFAL INTi Circulate BU 13:30 - 22:30 9.00 DRILL N DFAL INT1 TIH f/ 4435' to 14930', Wash f/ 14930' to 14950' Continue to TIH f/ 14950' to 15525' Taking weight @ 15525', 40K 22:30 - 00:00 1.50 DRILL N DFAL INT1 Wash down f/ 15525' to 15717' DPP 1620 psi C~3 730 GPM UWT 290K, DWT 150K 2/28/2007 00:00 - 03:00 3.00 DRILL N DFAL INT1 Wash f/ 15717' to 16449' DPP 1780 psi ~ 750 GPM UWT 320K, DWT 150K, RWT 220K 03:00 - 06:30 3.50 DRILL P INT1 On bottom, Try to drill, Bit balled Circulate, Pump nut plug sweep Bit not drilling, vary WOB, RPM & GPM Pump 2nd nut plug sweep, Bit began to drill Drill f/ 16449' to 16508' DPP 1780 psi ~ 750 GPM, RPM 120, WOB 18K 06:30 - 09:00 2.50 DRILL P INT1 Circulate 1 BU, DPP 2570 psi ~ 1012 GPM RPM 140 - 160, UWT 330K, DWT 170K 09:00 - 13:30 4.50 DRILL P INT1 Short trip f/ 16508' to 14769' Tight spot ~ 15925', Pull 50K over Wiped tight spot, POH to 14769, No problems TIH f/ 14769' to 16421', No problems Wash last stand to bottom, 16421' to 16508' 13:30 - 15:30 2.00 DRILL N SFAL INT1 Lost island electrical power Start up rig generators, 3 of 5 generators not operational Circulate at reduced rate, 1350 psi C~ 500 GPM 15:30 - 00:00 8.50 DRILL P INT1 Circulate, DPP 2650 psi @ 940 GPM, RPM 160 Mud weight out 9.8 ppg, Mud weight in 9.7 ppg Circulate 2X BU, Rack back 1 stand Circulate 1 X BU, Mud wt out 9.7 ppg, Mud wt in 9.5 ppg 3/1/2007 00:00 - 08:30 8.50 DRILL P INT1 Circulate 7X BU, DPP 2085 psi ~ 960 GPM RPM 130-160, UWT 330K, DWT 165K, RWT 230K Cuttings have cleaned up over shakers Mud wt in 9.4 ppg, mud wt out 9.5 ppg 08:30 - 09:30 1.00 DRILL P INT1 TOH to 16128' Spot 460 bbl - 15 ppb G-Seal Plus pill Covering the Schrader Bluff interval 09:30 - 00:00 14.50 DRILL P INT1 TOH f/ 16128' to 4341' Tight spot ~ 9145', Pull 50K over Wipe tight spot, no problems TOH to casing shoe C~3 4471', Monitor well, Well static TOH to 4341' 3/2/2007 00:00 - 03:30 3.50 DRILL P INT1 TOH f/ 4341' to BHA #7 03:30 - 06:00 2.50 DRILL P INTi LD BHA #7 06:00 - 07:00 1.00 DRILL P INT1 Clear rig floor of BHA components 07:00 - 11:00 4.00 CASE P INT1 Change top rams f/ 5-7/8" to 11-3/4" RU Franks tool, Change bails to 180"-500T 11:00 - 12:00 1.00 CASE P INT1 RU equipment to run 11-3/4" casing 12:00 - 14:00 2.00 CASE P INT1 RU Test equipment Test BOP door seals to Lo 250 psi, Hi 2500 psi Printed: 5/7/2007 11:24:17 AM gp Page 14 of 34 ~ Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: i Date From - To i Hours i Task Code NPT Phase I - - Description of Operations 3/2/2007 12:00 - 14:00 2.00 CASE P INT1 Test good, Pull test plug, LD test joint 14:00 - 19:30 5.50 CASE P INT1 RU equipment to run 11-3/4" casing 19:30 - 20:00 0.50 CASE P INT1 PJSM before running 11-3/4" casing 20:00 - 00:00 I 4.001 CASE I P I I INT1 3/3/2007 100:00 - 06:00 I 6.001 CASE I P I I INT1 06:00 - 08:00 I 2.00 I CASE I P I I INT1 08:00 - 00:00 I 16.001 CASE I P I I INT1 3/4/2007 100:00 - 05:00 I 5.001 CASE I P I I INT1 05:00 - 06:00 1.00 ~ CASE N RREP INT1 06:00 - 12:00 I 6.001 CASE I P I I INT1 12:00 - 13:00 1.001 CASE P INT1 13:00 - 17:00 4.001 CASE P I INT1 17:00 - 19:00 I 2.001 CASE I N I WAIT I INTi Review procedures for running skate & casing Discuss hazards, review job assignments Run 11-3/4", 60#, S-95, Hydril 563 casing Run shoe track, pump through & test float equipment Fill every joint w/ Frank's tool, Torque Turn each joint Run 19 jts, Casing depth @ 791' Run 11-3/4", 60#, S-95, Hydril 563 casing Run casing f/ 791' to 4471' Fill every joint w/ Frank's tool, Torque Turn each joint Record PU / SO weights every 1000' & plot vs. road map 1000' - PU 118K, SO 118K 2000' - PU 172K, SO 155K 3000' - PU 210K, SO 181 K 4000' - PU 235K, SO 193K Caing filled w/ 350 bbls of drilling mud w/ 3.5% Steellube Displaced w/ 510 bbls of drilling mud ~ 4471' Before spotting Steellube PU 250K, SO 198K After spotting Steellube PU 257K, SO 212K Run 11-3/4", 60#, S-95, Hydril 563 casing Run casing f/ 4471" to 10890' Fill every joint w/ Frank's tool, Torque Turn each joint Record PU / SO weights every 1000' & plot vs. road map 5000' - PU 273K, SO 208K 6000' - PU 305K, SO 210K 7000' - PU 340K, SO 219K 8000' - PU 360K, SO 219K 9000' - PU 390K, SO 220K 10000' - PU 450K, SO 225K Run 11-3/4", 60#, S-95, Hydril 563 casing Run casing f/ 10890' to 13481' Fill every joint w/ Frank's tool, Torque Turn each joint Record PU / SO weights every 1000' & plot vs. road map 11000' - PU 505K, SO 220K 12000' - PU 550K, SO 225K 13000' - PU 580K, SO 232K Single joint elevators failed Elevators will not open and close properly Replaced with backup set Run 11-3/4", 60#, S-95, Hydril 563 casing Run casing f/ 13481' to 16491' Fill every joint w/ Frank's tool, Torque Turn each joint Record PU / SO weights every 1000' & plot vs. road map 14000' - PU 610K, SO 238K RD casing running equipment Remove stinger from Frank's tool Circulate and condition mud for cement job Stage up rate to 10 BPM Circulate 2X BU, Circulating pressure 450 psi Schlumberger truck transporting Mud Push II Truck broke down due to brake system failure Printed: 5/7/2007 11:24:17 AM ~ ~ gp Page 15 of 34 ~ Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date (From - To Hours Task Code NPT Phase Description of Operations I __ I_ __- _-- _ _ - _- -- 3/4/2007 17:00 - 19:00 2.00 CASE N WAIT INT1 19:00 - 20:30 1.50 CASE P INT1 20:30 - 21:30 I 1.001 CASE I P I I INT1 21:30 - 00:00 I 2.501 CEMT I P INT1 3/5/2007 100:00 - 08:00 8.00 I CEMT P I INT1 08:00 - 13:00 I 5.001 CEMT I P I I INT1 13:00 - 14:30 I 1.501 CEMT I P I I INT1 14:30 - 00:00 I 9.501 CEMT I P I I INT1 3/6/2007 100:00 - 03:00 I 3.001 CEMT I P I I INT1 03:00 - 06:00 I 3.001 CEMT I P I I INT1 06:00 - 00:00 I 18.001 CEMT I N I WAIT I INT1 3/7/2007 100:00 - 05:00 I 5.001 CEMT I P I I INTi 05:00 - 08:30 I 3.501 CEMT I P I INT1 Circulate while waiting on truck MU 11-3/4" XO pup joint - Hydril 563 pin X Buttress Box MU cementing adapter and head Connect cementing lines Circulate casing ~ 5 BPM - 250 psi Pre job safety & operations meeting for cement job Discuss hazards, concerns and personnel assignments Pump 5 bbls of sea water Test lines to 2500 psi Pump 81 bbls of Mud Push II 10.5 ppg Shut down, drop bottom plug Pumping lead cement ~ 23:59 hrs 3/4/2007 Pump 875 bbls of lead cement - CemCRETE Blend 1671 sx, Yield 2.94, 11.5 ppg Pump 114 bbls of tail cement -Class G 543 sx, Yield 1.19, 15.8 ppg Drop top plug, followed by 15 bbls of sea water Turn over to rig for displacement w/ drilling mud Displace w/ 1831 bbls, final 30 bbls sea water (total to bump 1846 bbls) Bumped plug @ 07:00 hrs, FCP 975 psi, Pressure to 1475 psi Held f/ 10 min, Release pressure, Floats held Casing landed ~ 16491', Float collar C~ 16366' Displace 11-3/4" X 16" annulus w/ 9.4 ppg LSND mud Inject 380 bbls to clear 16" surface casing shoe ~ 4471' Max injection pressure 1008 psi, Final injection pressure 660 psi Average injection rate 3 bpm RD cement equipment, cement head & adapter Clear & clean rig floor Drain & wash out BOP stack & hanger profile Install secondary safety slings -bridge crane to BOPS Disconnect choke & kill line Disconnect riser /air boot assembly ND BOPS -lift stack 21" Center pipe in slip profile, Install slips Set slips w/ 575,000 weight on slips Set BOPS on wellhead NU BOPE, Close manual valves on mud cross Install XO & valve on 11-3/4" casing Disconnect bridge crane from BOP stack Connect bridge crane to annular preventer Well secured Northstar production facility start up. Sent crew hands and not essential personnel off the island during start up process. Install drawworks blower, grease choke manifold, prepare 3-1/2" x 6" variable rams for installation. Personnel back on Northstar island and resume operations at 00:00. ND and lifted annular preventer. Cut and pull section of 11-3/4" casing. Cut and pull riser and air bag. ND riser adapter. ND 16-3/4" double gate. Cut and pull section of 11-3/4" casing. Printed: 5/7/2007 11:24:17 AM ~ ~ gp Page 16 of 34 Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 33E Rig Number: Date From - To ~ Hours Task Code NPT Phase ! Description of Operations 3/7/2007 08:30 - 10:30 2.00 CEMT P INT1 ND 16-3/4" mud cross, single gate and spacer spools. 10:30 - 18:00 7.50 CEMT P INT1 Make final cut on 11-3/4" casing. Dress and bevel as per Vetco rep. Install pack off assembly. 18:00 - 00:00 6.00 CEMT P INT1 NU 16-3/4" x 13-5/8" tubing head and components. Change cable on bridge crane. Prepare to pressure test wellhead. 3/8/2007 00:00 - 03:00 3.00 CEMT P INT1 Finish NU 16-3/4" x 13-5/8" tubing head. Attempted to pressure test pack off. Leaking at flange connection. ND tubing head. Ring gasket came out deformed. 03:00 - 08:00 5.00 CEMT P INT1 Place BOP scaffolding and HCR valves in cellar area. Installing riser bell nipple and cleaning L-pits while troubleshooting wellhead situation. 08:00 - 09:00 1.00 CEMT P INT1 Rig up Tines to 16" x 11-3/4". Test lines to 2500 psi. Inject 20 bbls of mud down annulus. Blow down mud lines 09:00 - 12:00 3.00 CEMT N SFAL INT1 Vetco reps. working on fixing 16-3/4" x 13-5/8" tubing head as per Vetco specs. Performed the following activities in the rig while working on tubing head: - Change bails to 350 ton. 12:00 - 00:00 12.00 CEMT P INT1 Vetco reps. working on fixing 16-3/4" x 13-5/8" tubing head as per Vetco specs. Performed the following activities in the rig while working on tubing head: - Freeze protect 16" x 11-3/4" annulus with 180 bbls of diesel - Slip and cut drilling line - Service top drive and blocks - Cleaning mud pits - Clean under rotary table. - C/O lights in derrick 3/9/2007 00:00 - 04:00 4.00 CEMT P INT1 Finish tixing tubing head as pr Vetco specs. NU 16-3/4" x 13-5/8" tubing head and packoff. Tested packoff to 2700 psi. Set test plug. 04:00 - 20:00 16.00 BOPSU P INT1 NU 13-5/8" BOP and related equipment. Install 3-1/2" x 6" variables in upper and lower rams. 20:00 - 20:30 0.50 BOPSU P INT1 Test tubing head packoff to 3500 psi. 20:30 - 23:00 2.50 CEMT P INT1 Install mouse hole, iron roughneck track, master bushings. Pressure up koomey system. Function rams and annular. 23:00 - 00:00 1.00 CEMT P INT1 Pull test plug. Install wear bushing. 3/10/2007 00:00 - 00:30 0.50 CEMT P INT1 Install wear bushing 00:30 - 01:00 0.50 CEMT P INT1 Fill stack and check for leaks. 01:00 - 02:30 1.50 CEMT N RREP INT1 Vapor lamp lens from lamp above derrick shack shattered and fell to rig floor. Rig electrician checked lamp. Replaced lens 02:30 - 06:00 3.50 CEMT P INT1 RIH 50 stds 5-7/8" DP -Hydroclean DP from derrick (Drill Pipe Management). 06:00 - 06:30 0.50 CEMT P INTi Service drawworks 06:30 - 09:30 3.00 CEMT P INT1 PU 51 jts of 5-7/8" DP 1 x 1 from pipe shed and RIH (Drill Pipe Management) 09:30 - 12:30 3.00 CEMT P INT1 Circulate and displace well to seawater. Blow down mud lines, top drive and kill line. Fill trip tank w/ sea water 12:30 - 00:00 11.50 CEMT P INT1 POOH and rack back 17 slick 5-7/8" DP stands, installing supersliders (2/jt for total 6/stand). POOH 20 alternating 5-7/8 DP stands, racking back slick stands and installing supersliders on them, and laying down Hydroclean stands. Cont. POOH and racking back alternating stands (Drill Pipe Management) 3/11/2007 00:00 - 01:30 1.50 CEMT P INT1 Cont. POOH and racking back alternating stands 5-7/8" DP-Hydroclean DP. (Drill Pipe Management) Printed: 5!7/2007 11:24:17 AM ~ ~ gp Page 17 of 34 Operations Summary Report Legal Well Name: NS33 .Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRI LLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date From - To Hours Task Code NPT Ph ase Description of Operations ',3/11/2007 01:30 - 04:00 2.50 CEMT P INTi Flush BOP stack. Blow down lines NOTE: Daylight saving time change at 2:00 (1 hr) '~, 04:00 - 05:00 1.00 CEMT P INT1 C/O wear bushing to 10-3/4" ID wear bushing 05:00 - 08:00 3.00 CEMT P INT1 PU & MU BHA 08:00 - 09:00 1.00 CEMT P INT1 Shallow test tools. Blow down mud lines j 09:00 - 12:00 3.00 CEMT P INT1 Cont. PU & MU BHA '~ 12:00 - 14:00 2.00 CEMT P INTi PU 5" DP -Hydroclean DP 1 x 1 from pipe shed and RIH w/ I j BHA 14:00 - 15:30 1.50 CEMT P INT1 Load more 5" DP -Hydroclean DP in pipe shed to complete string needed. Strap and prepare to PU 15:30 - 00:00 8.50 CEMT P INT7 Cont. PU 5" DP -Hydroclean DP 1 x 1 from pipe shed and RIH w/BHA. Need to thaw hydroclean joints of ice and snow to allow rabbit drift through 3/12/2007 00:00 - 06:00 6.00 CEMT P INT1 Cont. PU 5" DP -Hydroclean DP 1 x 1 from pipe shed and RIH w/BHA. Need to thaw hydroclean joints of ice and snow to allow rabbit drift through. Total joints PU: 219 Change elevators to 5-7/8 06:00 - 13:00 7.00 CEMT P INT7 RIH on 5-7/8" DP alternating stands and slick stands to 16366'. Tagged FC. 13:00 - 19:30 6.50 CEMT P INT1 Displace well to MOBM as per program. Checked PU, SO and Rot. weight after displacing to MOBM: PU: 325 k; SO: 185 k; Rot.: 223 k 19:30 - 20:00 0.50 CEMT P INT1 Blow down lines. POOH and rack back 1 stand 20:00 - 22:00 2.00 BOPSU P INT1 PU and MU RTTS packer. RIH and set ~ 60'. UD 2 jtts and running tool. Test packer to 500 psi. 22:00 - 00:00 2.00 BOPSU P INT1 PU test joint and MU wear bushing puller. Change out cellar pump lines due to ice plug in drilling sweep. Preparing to pump out BOP stack. 3/13/2007 00:00 - 00:30 0.50 BOPSU P INT1 Pump out stack. Pull wear ring 00:30 - 01:30 1.00 BOPSU P INT1 Install Test plug. RU 5-7/8 test joint and testing equipment 01:30 - 07:30 6.00 BOPSU P INT1 Test BOP and related equipment to 250 / 5000 psi (annular to 3500 psi) per BP / AOGCC regulations. Test witnessed by WSL (Chacin / Rockett) and Tourpusher (Applegate). Lou Grimaldi, AOGCC Inspector, waived witness of test. Testing to 5-7/8" DP and 5" DP. 07:30 - 09:30 2.00 BOPSU P INT1 UD test joint and RD testing equipment. Drain water from stack and blow down all lines 09:30 - 10:00 0.50 BOPSU P INT1 Pull out test plug. Install wear bushing 10:00 - 11:30 1.50 BOPSU P INT1 MU running tool and 2 joints 5-7/8 DP. RIH, engage and release RTTS. Pull RTTS to rig floor 11:30 - 13:00 1.50 BOPSU P INT1 Break and UD RTTS. Clear rig floor 13:00 - 13:30 0.50 CEMT P INT1 Fill stack with MOBM, circulate and prepare to test 11-3/4" casing 13:30 - 15:00 1.50 CEMT P INT1 Pressure test 11-3/4" casing to 2500 psi x 30 min. Record test on chart. Blow down lines 15:00 - 15:30 0.50 CEMT P INT1 Service Top Drive 15:30 - 19:30 4.00 CEMT P INT1 Drill out FC, shoetrack, shoe and rat hole to 16508' 19:30 - 21:00 1.50 DRILL P INT1 Drill 20' of new hole from 16508' to 16528' 21:00 - 22:00 1.00 DRILL P INT1 Circulate in preparation to FIT 22:00 - 23:00 1.00 DRILL P INT1 Perform FIT to 12.5 ppg EMW (9.2 ppg MW ; 1220 psi surface pressure) 23:00 - 00:00 1.00 DRILL P INT1 Drill from 16528' to 16552'. Printed: 5/7/2007 11:24:17 AM gP Page 18 of 34 ~ Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date ~ From - To ~ Hours ~ Task ~ Code ~ NPT Phase 3/14/2007 ~ 00:00 - 01:30 ~ 1.50 ~ DRILL P ~ LNR1 01:30 - 02:00 0.50 DRILL N DFAL LNR1 02:00 - 08:30 6.50 DRILL N DFAL LNR1 08:30 - 09:00 0.50 DRILL N DFAL LNR1 09:00 - 12:00 3.00 DRILL N DFAL LNR1 12:00 - 13:00 1.00 DRILL P LNR1 13:00 - 14:00 1.00 DRILL P LNR1 14:00 - 19:00 I 5.001 DRILL I P 1 I LNR1 19:00 - 20:30 ~ 1.50 ~ DRILL ~ P ~ ~ LNR1 20:30 - 00:00 3.50 DRILL P LNR1 3/15/2007 00:00 - 05:30 5.50 DRILL P LNR1 05:30 - 08:00 2.50 DRILL N RREP LNR1 08:00 - 10:30 2.50 DRILL P LNR1 10:30 - 12:00 1.50 DRILL P LNR1 12:00 - 19:00 7.00 DRILL P LNR1 19:00 - 21:00 2.00 DRILL P LNR1 21:00 - 00:00 I 3.001 DRILL I P I I LNR1 3/16/2007 00:00 - 02:00 2.00 DRILL P LNR1 02:00 - 04:00 2.00 DRILL N RREP LNR1 04:00 - 06:00 2.00 DRILL P LNR1 06:00 - 07:00 1.00 DRILL P LNR1 07:00 - 10:00 3.00 DRILL P LNR1 10:00 - 11:30 1.50 DRILL P LNR1 11:30 - 12:00 0.50 DRILL P LNR1 12:00 - 21:00 9.00 DRILL P LNR1 21:00 - 00:00 3.00 DRILL P LNR1 3!17!2007 00:00 - 03:30 3.50 DRILL P LNR1 03:30 - 05:30 2.00 DRILL P LNR1 05:30 - 06:00 0.50 DRILL P LNR1 06:00 - 08:00 2.00 DRILL P LNR1 08:00 - 12:00 4.00 DRILL P LNR1 Description of Operations Circulate and attempt to shear open Rhino Reamer. Stage circulation up to 820 gpm ~ 3820 psi trying to shear Rhino Reamer. Circulating pressure close to max. allowable for 6" liners. Discuss options. Proceed to change liners in mud pumps to 5-1/2" to increase circulating pressure capacity. Pull back to shoe Change liners to 5-1/2" in mud pumps 1 & 2. Circulate and condition mud. Mud is cold due to waiting on changing liners on mud pumps. Attempt to shear Rhino Reamer. Stage up mud pumps to 22 bpm r~ 4550 psi. Drill from 16552' to 16618'. Torque erratic 32-40k. Rot. 120 rpm. 840 gpm @ 3890 psi. Pull back to the shoe to observe indication of Rhino Reamer being open. Pick up and slack off weights indicate Rhino Reamer is open. RIH back to 16618' Drill from 16618' to 16730'. Adjust WOB, RPM and pump rate at different combinations to minimize erratic torque and drillstring harmonics without improvement. PU: 410k, SO: 100k; Rot: 213k Circulate hole clean @ 850 gpm. Keep RPM at 60 to control drillstring vibrations Pull to the shoe. Pump dry job. Cont. POOH. POOH racking back 5-7/8" DP. Repair iron roughneck. Repair lights on derrick Cont. POOH racking back 5-7l8" DP Change elevators to 5". Cont. POOH 5" DP, racking back 10 stands. Prepare to UD 5" DP. POOH and UD i x 1 5" DP to pipe shed. Total joints UD: 189 Rack back jar, HWs and collar stands. POOH rest of BHA to bit. Rhino Reamer came out in good conditions. Cutting structure and blades do not show any sign of damage. Bit in good condition. Shallow test Rhino Reamer. Blades open at 470 gpm. Powerdrive operating properly. Proceed to UD BHA UD BHA #8. Blow down mud lines. Clean and clear rig floor Repair rig lights. Service drawworks. C/O oil in iron roughneck. Clean trip tank #2 Cut & slip drill line. Adjust brakes. Service top drive and blocks PU & MU BHA #9. Shallow test toots. Blow down mud lines Finish PU & MU BHA #9 Calibrate mud loggers drawworks encoder. PU 189 jts 5" DP 1 x 1 from pipe shed and RIH, filling every 90 jts. RIH on 5" DP and 5-7/8" DP stands from derrick to 9072' Cont. RIH on 5-7J8" DP stands to 15759'. PU: 350k ; SO 160k, Cont. RIH washing down f/ 15751' to 16606' ~ 213 gpm. Open Rhino Reamer and set tools Ream down fl 16606' to 16730' Dir. drill from 16730' to 16913'. 865 gpm ~ 3800 psi. TQ on: 24-38k, TO off: 25-35k, PU: 395k, SO: 120k, rot weight: 230k. RPM: 120. WOB:15k Printed: 5!7!2007 11:24:17 AM • i gp Page 19 of 34 Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 33E Rig Number: Date From - To Hours i Task i Code i NPT Phase I Description of Operations 3/17/2007 12:00 - 00:00 12.00 ~ DRILL ~ P ~ ~ LNR1 Dir. drill from 16913' to 17344'. 846 gpm ~ 3800 psi. TO on: 3/18/2007 100:00 - 04:00 I 4.001 DRILL I P I I LNR1 04:00 - 05:30 I 1.501 DRILL I N I RREP I LNR1 05:30 - 06:00 0.50 DRILL P LNR1 06:00 - 09:00 3.00 DRILL P LNR1 09:00 - 12:00 3.00 DRILL N RREP LNR1 12:00 - 00:00 12.00 DRILL P LNR1 3/19/2007 100:00 - 09:30 I 9.501 DRILL I P I I LNR1 09:30 - 10:00 0.50 DRILL P LNR1 10:00 - 12:00 2.00 DRILL P LNRi 12:00 - 19:00 I 7.001 DRILL (P I I LNR1 19:00 - 21:00 2.00 DRILL P LNR1 21:00 - 00:00 3.00 DRILL P LNR1 3/20/2007 100:00 - 09:30 9.501 DRILL P LNR1 09:30 - 10:00 0.50 DRILL P LNR1 10:00 - 00:00 14.00 DRILL P LNR1 3/21/2007 100:00 - 06:00 I 6.001 DRILL I P I I LNR1 06:00 - 07:00 1.00 DRILL N RREP LNR1 07:00 - 10:00 3.00 DRILL P LNR1 10:00 - 10:30 0.50 DRILL P LNR1 10:30 - 13:00 2.50 DRILL P LNR1 31-42k, TO off: 28-35k, PU: 395k, SO: 110k, rot weight: 235k. RPM: 80-120. WOB: 15k. Adjusting RPM to control stick & slips. Dir. drill from 17344' to 17555'. 850 gpm ~ 3670 psi. TO on: 31-42k, TO off: 28-35k, PU: 420k, SO: 105k, rot weight: 230k. RPM: 120. W0B:15k. Oiler pump on mud pump #1 failed. Shut down mud pump #1. Switched to mud pump #3. Suction line to mud pump #3 getting air. Circulating w/mud pump #2 and reciprocating pipe while working on mud pump #1 and suction line mud pump #3. Dir. drill from 17555' to 17593' Circulate hole clean 1-1/2 BU C~3 850 gpm and 125 rpm C/O swab in mud pump #2. Circulate w/ mud pump #1 while working on pump #2. (working on suction line mud pump #3). Dir. drill from 17593' to 18029'. 846 gpm ~ 3670 psi. TO on: 26-42k, TO off: 26-38k, PU: 440k, SO: 100k, rot weight: 250k. RPM: 120. W06:12k. Dir. drill from 18029' to 18361'. 846 gpm ~ 3670 psi. TO on: 32-44k, TO off: 26-40k, PU: 440k, SO: 100k, rot weight: 245k. RPM: 80-120. W0B:12k. Service top drive and drawworks Dir. drill from 18361' to 18457'. 850 gpm ~ 3550 psi. TO on: 28-45k, TO off: 25-43k, PU: 440k, SO: 110k, rot weight: 240k. RPM: 90. W06:8-10k. Dir. drill from 18457' to 18746'. 850 gpm @ 3500 psi. TO on: 25-49k, TO off: 26-40k, PU: 430k, SO: 110k, rot weight: 230k. RPM: 120. WOB:10-15k. Circulate BU C~ 850 gpm ; 120 rpm. Dir. drill from 18746' to 18794'. 850 gpm ~ 3550 psi. TO on: 28-45k, TO off: 26-40k, PU: 440k, SO: 110k, rot weight: 240k. RPM: 120. WOB: 10-12k. Intermittent stand pipe pressure spikes to 4500 psi Dir. drill from 18794' to 19228'. 850 gpm @ 3580 psi, RPM: 120. WOB: 10-15k, TQ on 28-45k, TO off 26-40k UWT 445k, DWT 110k, RWT 230k Intermittent stand pipe pressure spikes to 4500 psi Service top drive & drawworks Dir. drill from 19228' to 19710'. 850 gpm ~ 3650 psi RPM: 120, WOB: 10-15k, TO on: 28-47k, TO off: 26- 42k UWT 450k, DWT 100k, RWT 240k Slow pump rate ~ 19619' MD, 8020' TVD, Mud wt 9.3 ppg SPR Pump #1 - 30 SPM 610 psi, 40 SPM 680 psi SPR Pump #3 - 30 SPM 640 psi, 40 SPM 680 psi Dir. drill from 19710' to 19980'. 850 gpm ~ 3750 psi RPM: 120, WOB: 10-15k, TO on: 28-48k, TO off: 26- 44k UWT 455k, DWT 105k, RWT 240k Replace swab on mud pump #1 Circulate w/ mud pump #2 - 420 GPM Directional drill f/ 19980' to 20095' Service top drive & drawworks Dir. drill from 20095' to 20192'. 850 gpm ~ 3750 psi RPM: 120, WOB: 15-20k, TO on: 28-47k, TO off: 26- 45k Printed: 5/7/2007 11:24:77 AM s • gp Page 20 of 34 Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/21/2007 10:30 - 13:00 2.50 DRILL P LNR1 UWT 460k, DWT 110k, RWT 245k 13:00 - 15:00 2.00 DRILL N RREP LNR1 Replace valve & seat on mud pump #2 Repair suction hose on mud pump #3 15:00 - 00:00 9.00 DRILL P LNR1 Dir. drill from 20192' to 20530'. 850 gpm Q 3800 psi RPM: 120, WOB: 10-20k, TO on: 28-49k, TO off: 26- 47k UWT 460k, DWT 110k, RWT 250k Slow pump rate @ 20485' MD, 8285' TVD, Mud wt 9.3 ppg SPR Pump #1 - 30 SPM 690 psi, 40 SPM 760 psi SPR Pump #3 - 30 SPM 700 psi, 40 SPM 770 psi 3/22/2007 00:00 - 01:00 1.00 DRILL P LNR1 Directional drill f/ 20530' to 20579' 01:00 - 08:00 7.00 DRILL P LNR1 Circulate for wiper trip -drill pipe management DPP 3800 psi C~ 850 GPM, RPM 120, 3.5X BU Mud wt in 9.3+, Mud wt out 9.5 Monitor well for 15 minutes, well static Pump dry job, install wiper rubber 08:00 - 12:00 4.00 DRILL P LNR1 TOH f/ 20579' to 18072' 12:00 - 13:00 1.00 DRILL P LNR1 Pump 2nd dry job Blow down mud lines 13:00 - 18:30 5.50 DRILL P LNR1 TOH f/ 18072' to 14701' 18:30 - 19:30 1.00 DRILL P LNR1 Clean rig floor 19:30 - 22:00 2.50 DRILL P LNRi Inspect & Service Top Drive, Drawworks, Crown Sheaves 22:00 - 23:00 1.00 DRILL P LNRi Test MW D tool Blow down mud lines 23:00 - 00:00 1.00 DRILL P LNR1 Cut & slip drilling line 3/23/2007 00:00 - 02:30 2.50 DRILL P LNR1 Cut & slip drilling line Service rig blocks 02:30 - 08:30 6.00 DRILL P LNR1 TIH f/ 14701' to 20537' Check torque on super sliders 08:30 - 10:30 2.00 DRILL P LNR1 Wash f/ 20537' to 20579' Change shaker screens after warm mud to surface 10:30 - 22:00 11.50 DRILL P LNR1 Dir. drill from 20579' to 20922', 850 gpm @ 3700 psi RPM: 100-120, WOB: 10-20k, TO on: 32-49k, TO off: 33- 46k UWT 510k, DWT 110k, RWT 260k 22:00 - 00:00 2.00 DRILL P LNR1 Torque climbed to 45-50K Circulate 2X BU, DPP 3800 psi ~ 850 GPM, RPM 120 Reciprocate 90', Monitor cuttings over shaker 3/24/2007 00:00 - 01:30 1.50 DRILL P LNR1 Circulate 2X BU DPP 3800 psi @ 850 GPM, RPM 120 01:30 - 17:00 15.50 DRILL P LNR1 Dir. drill from 20922' to 21305'. 850 gpm C~3 3900 psi RPM: 120, WOB: 5-15k, TO on: 33-49k UWT 520k, DWT 105k, RWT 260k Slow pump rate ~ 21305' MD, 8528' TVD, Mud wt 9.3 ppg SPR Pump #1 - 30 SPM 890 psi, 40 SPM 950 psi SPR Pump #3 - 30 SPM 890 psi, 40 SPM 960 psi Pump 80 bbl pill w/ 6% Steellube Torque & drag dropped considerably UWT 450K, DWT 140K, RWT 260K RPM 120, TO on 30-40K, TO off 28-35K 17:00 - 19:30 2.50 DRILL N SFAL LNR1 Replace swab & valves on mud pump #1 Replace valve cap gaskets on pump #3 19:30 - 00:00 4.50 DRILL P LNR1 Dir. drill from 21305' to 21502'. 820 gpm @ 3800 psi RPM: 120, WOB: 5-15k, TO on: 30-42k Printed: 5/7/2007 11:24:17 AM gp Page 21 of 34 ~ Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date ;~ Name: ell Name: e: Name: From - To NS33 NS33 DRILL+C NABOB NABOB Hours ~ OMPLE S ALASK S 33E Task l TE A DRI Code LING NPT Start I Rig Rig Phase Spud Date: 1/29/2007 : 1/22/2007 End: Release: Number: Description of Operations 3/24/2007 19:30 - 00:00 4.50 DRILL P LNR1 UWT 450k, DWT 140k, RWT 260k 3/25/2007 00:00 - 02:00 2.00 DRILL P LNR1 Directional drill f/ 21502' to 21610' RPM 120, TO on 33-48K, SPP 3980 psi ~ 840 GPM UWT 440K, DWT 135K, RWT 260K 02:00 - 02:30 0.50 DRILL N RREP LNR1 Replace swab in mud pump #1 02:30 - 04:30 2.00 DRILL P LNR1 Directional drill f/ 21610' to 21663' RPM 120, TO on 33-48K, SPP 3980 psi ~ 840 GPM 04:30 - 06:00 1.50 DRILL P LNR1 Top HRZ 21610' MD, 8623' TVD Add 14.3 ppg spike mud to system Weight up to 10.1 ppg 06:00 - 12:00 6.00 DRILL P LNR1 Directional drill f/ 21663' to 21888' RPM 120, TO on 33-48K, SPP 3990 psi ~ 820 GPM UWT 440K, DWT 135K, RWT 260K 12:00 - 13:30 1.50 DRILL P LNR1 Service top drive Replace bad saver sub on top drive 13:30 - 14:30 1.00 DRILL P LNR1 Directional drill f/ 21888' to 21984' 14:30 - 16:00 1.50 DRILL P LNR1 Make connection ~ 21984' Could not rotate @ 50K torque Set back stand of 5-7/8" DP Circulate 820 GPM - 3990 psi Work pipe, UWT 550K, Establish rotation, 120 RPM Reciprocate 90', Circulate 8000 stks to move solids up hole 16:00 - 00:00 8.00 DRILL P LNR1 Dir. drill from 21984' to 22337', 820 gpm ~ 4000 psi RPM: 120, WOB: 15-20k, TO on: 32-35K, TO off 27-28K UWT 430k, DWT 145k, RWT 270k Slow pump rate fps 22173' MD, 8793' TVD, Mud wt 10.2 ppg SPR Pump #1 - 30 SPM 720 psi, 40 SPM 810 psi SPR Pump #2 - 30 SPM 760 psi, 40 SPM 830 psi 3/26/2007 00:00 - 01:00 1.00 DRILL N RREP LNR1 Replace swab on mud pump #1 01:00 - 10:00 9.00 DRILL P LNR1 Directional drill f/ 22337' to 22799', 810 GPM C~? 4040 psi RPM: 120, WOB: 14-18k, TO on: 33-37K, TO off 22K UWT 450k, DWT 140k, RWT 270k 10:00 - 11:00 1.00 DRILL N RREP LNR1 Replace swab on mud pump #2 Valve failure -pulsation dampener mud pump #3 Circulating w/ pump #1 410 GPM ~ 1350 psi 11:00 - 13:30 2.50 DRILL P LNR1 Directional drill f/ 22799' to 22913', 810 GPM ~ 4100 psi RPM: 120, WOB: 14-20k, TO on: 33-36K, TO off 26K UWT 460k, DWT 140k, RWT 270k 13:30 - 14:00 0.50 DRILL N RREP LNR1 Replace swab on mud pump #1 Circulating w/ pump #2 375 GPM ~ 1320 psi 14:00 - 23:00 9.00 DRILL P LNR1 Directional drill f/ 22913' to 23236', 810 GPM ~ 4180 psi RPM: 120, WOB: 14-20k, TQ on: 32-39K, TO off 29K UWT 470k, DWT 140k, RWT 270k 23:00 - 00:00 1.00 DRILL P LNRi Circulate f/ trip into 11-3/4" casing for BOP test DPP 4100 psi ~ 810 GPM, RPM 125, TO off 31 K Slow pump rate @ 23236' MD, 9212' TVD, Mud wt 10.2 ppg SPR Pump #1 - 30 SPM 760 psi, 40 SPM 820 psi SPR Pump #2 - 30 SPM 770 psi, 40 SPM 850 psi 3/27/2007 00:00 - 03:30 3.50 DRILL P LNR1 Circulate f/ trip into 11-3/4" casing for BOP test DPP 4170 psi ~ 810 GPM, RPM 125, TQ off 32K 03:30 - 04:00 0.50 DRILL N RREP LNR1 Replace swab on mud pump #1 Circulating w/ pump #2 405 GPM C~3 1390 psi 04:00 - 08:00 4.00 DRILL P LNR1 Circulate f/ trip into 11-3/4" casing for BOP test Printed: 5/7/2007 11:24:17 AM ! • BP Page 22 of 34 Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date ;From - To Hours Task Code NPT Phase Description of Operations ---- I -- - - -_~ _ - 3/27/2007 04:00 - 08:00 4.00 ~ DRILL P ~ LNR1 DPP 4180 psi ~ 810 GPM, RPM 125, TO off 32K 08:00 - 20:00 I 12.001 DRILL I P I I LNR1 20:00 - 20:30 0.50 DRILL P LNR1 20:30 - 00:00 3.50 DRILL P LNR1 3/28/2007 100:00 - 01:00 I 1.001 DRILL I P I I LNR1 01:00 - 02:00 1.00 DRILL P LNR1 02:00 - 04:00 2.00 DRILL P LNR1 04:00 - 04:30 0.50 DRILL P LNR1 04:30 - 05:30 1.00 BOPSU P LNR1 05:30 - 09:00 3.50 BOPSU P LNR1 09:00 - 15:00 6.001 BOPSUp P LNR1 15:00 - 17:00 I 2.001 BOPSUFi N I MISC I LNR1 17:00 - 18:30 1.50 BOPSU P LNR1 18:30 - 20:00 1.50 BOPSU P LNR1 20:00 - 21:00 1.00 BOPSU P LNR1 Mud wt in 10.3 ppg, Mud weight out 10.3 ppg Total circulation 4X BU Monitor well 10 minutes, well static Pump dry job, blow down lines TOH f/ 23236' to 16798' UWT 400K, DWT 165K @ 16798' UWT over projected trip road map Service top drive, change oil filter on top drive Circulate -stage pumps to 780 GPM @ 3900 psi Work pipe f/ 16798' to 16737' RPM 100, Torque to 50K, stalling rotary Wellbore packing off at times, re-establish circulation Reciprocating DP is difficult, reciprocating slowly Establish 800 GPM & 120 RPM Well unloaded significant cuttings after 1.5 BU Well packed off while reciprocating DP Re-establish circulation & rotation PU to 460K without breaking over, DWT 120K Circulate ~ 16737', DPP 3900 psi C~ 780 GPM RPM 120, Torque 25K Still having difficulty reciprocating TOH f/ 16737' to 16606' Work pipe uphole w/ 450K UWT Stage up pumps, packing off & stalling rotary Reached effective RPM & GPM after 40 minutes Circulate ~ 16606', DPP 3700 psi ~ 800 GPM RPM 120-130, Torque 23K Well unloaded after 1.5 BU, shakers cleaning up TOH f/ 16606' to 16340' UWT 360 - 370K MU RTTS packer, RIH & set at 100.5' Bit depth - 16435', Test from above to 500 psi Drain BOP stack Pull wear bushing, normal wear on bushing Set test plug, RU BOP test tools, Fill stack w/ fresh water Test BOP and related equipment to 250 / 5000 psi (annular to 3500 psi) per BP / AOGCC regulations. Test witnessed by WSL (LeBlanc/Dinger) and Tourpusher (Kennedy/Leigh). Lou Grimaldi, AOGCC Inspector, waived witness of test. Testing on both 5-7/8" DP and 5" DP. Non-productive time per contract - 6 hrs to complete BOPE test Test BOP and related equipment to 250 / 5000 psi (annular to 3500 psi) per BP / AOGCC regulations. Test witnessed by WSL (LeBlanc/Dinger) and Tourpusher (Kennedy/Leigh). Lou Grimaldi, AOGCC Inspector, waived witness of test. Testing on both 5-7/8" DP and 5" DP. No failures, Steam upper & lower IBOPs prior to obtaining 5000 psi test Blow down top drive, choke line, manifold and kill lines Vacuum fresh water from BOP stack Pull test plug, Set wear bushing RIH, Release RTTS packer, Monitor well -well static Printed: 5/7/2007 11:24:17 AM BP Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Event Name: DRILL+COMPLETE Start: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date ~ From - To ' Hours ~ Task Code ~ NPT Phase 1 /22/2007 Page 23 of 34 ~ Spud Date: 1 /29/2007 End: Description of Operations 3/28/2007 20:00 - 21:00 1.00 BOPSU P LNRf TOH, LD RTTS packer & X-Os 21:00 - 21:30 0.50 DRILL P LNR1 Clear & clean rig floor 21:30 - 23:00 1.50 DRILL P LNR1 Service top drive, crown blocks & drawworks 23:00 - 00:00 1.00 DRILL P LNR1 Cut & slip drilling line -hang blocks 3/29/2007 00:00 - 02:00 2.00 DRILL P LNR1 Cut & slip drilling line 02:00 - 03:30 1.50 DRILL P LNR1 Test MW D, Test OK 03:30 - 12:00 I 8.501 DRILL I P I I LNR1 12:00 - 17:00 I 5.001 DRILL I P I I LNR1 17:00 - 23:30 I 6.501 DRILL I P I I LNR1 23:30 - 00:00 I 0.501 DRILL I P I I LNR1 3/30/2007 100:00 - 03:00 I 3.001 DRILL I P I I LNR1 03:00 - 11:00 I 8.001 DRILL I P I I LNR1 11:00 - 12:00 I 1.001 DRILL I N I DPRB I LNR1 12:00 - 15:30 I 3.501 DRILL I N I DPRB I LNR1 15:30 - 17:00 I 1.501 DRILL I N I DPRB I LNR1 17:00 - 00:00 I 7.001 DRILL I N I DPRB I LNR1 TIH f/ 16340' to 16900" Set down ~ 16900' Circulate & work pipe f/ 16900' to 16922" Well bore is packing off and stalling rotary Stand one back to 16892' Staging up flow rate for 2nd time, Wellbore packed off Pull 50K over to find depth to circulate Work pipe to 16862', Stage up pumps DPP 3950 psi @ 800 GPM, RPM 125 Significant cuttings during first bottoms up with ECD spikes of 11.75 & 13.1 ppg. Normal ECD 11.21 to 11.25. Ream f/ 16862' to 16980' at 45' per hour. Additional 2 B/U while reaming with no significant cuttings coming across shakers.3900 psi @ 800 GPM, RPM 125, TO 32-35 Wash f/ 16980' to 17272' 265 GPM, 840 psi, DWT 145-155K TIH on elevators f/ 17272' to 21776' DWT 140-160K Set down 50K @ 21776' Pick up to 21726' Stage up pumps to circulate, well packing off Establish rotation, RPM 120 Circulate ~ 21726' Staging up pumps due to Torque & Packoffs Work pump to 757 GPM, SPP 4085 psi RPM 120, TO 28-33K Significant increase in cuttings after 1.5 BU Cuttings decreased after 2 BU Ream f/ 21726' to 21980' RPM 120, TO 28-38K, DPP 4085 psi @ 750 GPM WOB 2-10K, Reaming ROP 10-50 fph UWT 470K, DWT 155K, RWT 250K Well appears to have open hole sidetracked ~ 21780' Circulate DPP 3925 psi ~ 750 GPM RPM 125, TO 25-29K Reciprocate f/ 21980' to 21890' Wellbore packed off Work pipe trying to find depth to establish circulation TOH f/ 21890' to 21595' Work through tight spots w/ P/U wts to 560K. Stage up pump to 775 GPM ~ 4200 psi RPM 122, TO 28-30K, 1.5 hrs to stage up pumps Wellbore packing off & stalling rotary Circulate to clean Wellbore DPP 4200 psi, 800 GPM, RPM 125, TO 30K Reciprocate f/ 21495' to 21598' Printed: 5/7/2007 11:24:17 AM gp Page 24 of 34 Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date From - To I Hours ! Task ~ Code ~ NPT Phase Description of Operations ' - --_~__ _ _- ~ l_ 3/30/2007 17:00 - 00:00 7.00 DRILL N DPRB LNR1 Circulate 3.5 BU, Weil unloading significant cuttings 3/31/2007 00:00 - 01:30 1.50 DRILL N ~ DPRB LNR1 Circulate to clean wellbore 01:30 - 02:30 I 1.001 DRILL I N I DPRB I LNR1 02:30 - 03:30 I 1.001 DRILL I N I DPRB I LNR1 03:30 - 04:00 0.50 DRILL N DPRB LNR1 04:00 - 09:00 5.00 DRILL N DPRB LNR1 09:00 - 10:00 I 1.001 DRILL I N I DPRB I LNR1 10:00 - 10:30 I 0.501 DRILL I N I DPRB I LNR1 10:30 - 11:30 1.00 DRILL N DPRB LNR1 11:30 - 14:00 2.50 DRILL N DPRB LNR1 14:00 - 14:30 I 0.501 DRILL I N C DPRB I LNR1 14:30 - 20:30 I 6.001 DRILL I N I DPRB I LNR1 20:30 - 00:00 I 3.501 DRILL I N I DPRB I LNR1 4/1/2007 100:00 - 15:30 I 15.501 DRILL I N f DPRB I LNR1 15:30 - 17:00 I 1.501 DRILL I N I RREP I LNR1 17:00 - 23:00 I 6.001 DRILL I N I DPRB f LNR1 DPP 4200 psi, 800 GPM, RPM 125, TO 30K Reciprocate f/ 21495' to 21598' Circulate a total of 4 BU, cuttings decreased ~ 3.5 BU Short trip 15 stands, pull 7 stands pick up weight increasing from 440 to 460K RIH 2 stands to 21,060' and circulate for 30 minutes 120 RPM ~ 33Kft/Ibs, 780 GPM @ 4,200 psi, Reciprocate stand POH 3 stands, pick up weight increasing from 435K to 460K RIH 1 stand to 20,756' and CBU X 2.5 120 RPM C~3 31Kft/Ibs, 785 GPM C~ 4,250 psi, Reiprocate stand UWT 440K, DWT 150K, RWT 250K POH f/ 20922' to 20330' Pull 40K over, RIH to 20535' Circulate 30 minutes, DPP 4250 psi ~ 785 GPM Reciprocate 90', UWT 435K, DWT 160K POH f/ 20535' to 20205' Pull 40K over Wash f/ 20205' to 21629', No Rotation DPP 1270 psi @ 300 GPM Wellbore tight & trying to packoff ~ 21629' Stage pump to 780 GPM ~ 4200 psi RPM 120, Reciprocate 90' Ream f/ 21629' to 21983' DPP 4200 psi C 750 GPM, RPM 120 UWT 420K, DWT 150K, RWT 253K Tag bottom of open hole sidetrack ~ 21983' SPRs C~2 21636' MD, 8630' TVD, MW 10.8 ppg SPR #1 - 30 SPM 620 psi, 40 SPM 670 psi SPR #2 - 30 SPM 620 psi, 40 SPM 720 psi Directional drill f/ 21983' to 22116' DPP 4230 psi, GPM 775, WOB 15K, RPM 120, TO 33K Backream 30' on each stand Directional drill f/ 22116' to 22561' DPP 4285 psi, GPM 785, WOB 10 - 15K, RPM 120 - 140, TO on 33K, TO off 31 K Backream 90' on each stand UWT 430K, DWT 140K, RWT 250K Raise YP f/ 17-18 to 23-24 Cuttings increased 300% to 500% over normal drilling returns Cutting size is much larger, shale still has PCD cutter marks intact Torque getting less, Increase drilling RPM to 140 Lost top drive functions, troubleshoot problem Replace top drive encoder, fully functional Circulate -DPP 4260 psi ~ 785 GPM Work DP periodically Directional drill f/ 22561' to 22755' DPP 4285 psi, GPM 785, WOB 10 - 15K, RPM 120 - 150, TO on 33K, TO off 29K Printed: 5/7/2007 11:24:17 AM i • gp Page 25 of 34 Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/1/2007 17:00 - 23:00 ( 6.00 ~ DRILL N ~ DPRB LNR1 Backream 90' on each stand 23:00 - 00:00 I 1.001 DRILL I N I DPRB I LNR1 4/2/2007 100:00 - 06:00 I 6.001 DRILL I N I DPRB I LNR1 06:00 - 18:30 ~ 12.50 ~ DRILL ~ N ~ DPRB ~ LNR1 18:30 - 19:00 0.50 DRILL N DPRB LNR1 19:00 - 20:00 1.00 DRILL N RREP LNR1 20:00 - 00:00 4.00 DRILL N DPRB LNR1 4/3/2007 100:00 - 04:30 4.50 ~ DRILL I P LNR1 04:30 - 08:00 3.50 DRILL N RREP LNR1 08:00 - 12:00 4.00 DRILL P LNR1 12:00 - 00:00 I 12.001 DRILL I P I I LNR1 4/4/2007 00:00 - 01:00 1.00 DRILL P LNRi 01:00 - 02:00 1.00 DRILL P LNR1 02:00 - 03:00 1.00 DRILL P LNR1 03:00 - 09:00 6.00 DRILL P LNR1 UWT 420K, DWT 145K, RWT 250K Torque getting less, Increase drilling RPM to 150 Begin circulating 3 X BU, DPP 4285 psi, GPM 785 RPM 150, TO off 31 K, Reciprocate 100' SPRs - 22755' MD, 9087' TVD, MW 10.8 ppg SPR Pump #2 - 30 SPM 1030 psi, 40 SPM 1100 psi SPR Pump #3 - 30 SPM 1020 psi, 40 SPM 1120 psi Circulate 3 X BU, DPP 4300 psi, GPM 785 RPM 150, TO off 30K, Reciprocate 100' Cuttings are currently about 1/3 the amount of the 1st BU Directional drill f/ 22755' to 23118' DPP 4280 psi, GPM 780, WOB 10 - 15K, RPM 140 - 150, TO on 35K, TO off 31 K Backream 90' on each stand UWT 440K, DWT 150K, RWT 250K Service top drive Change shaker screens Rig repair, Top drive malfunction Change top drive encoder card, No problems Directional drill f/ 23118' to 23224'- DPP 4270 psi, GPM 780, WOB 15 - 20K, RPM 140, TO on 35K, TO off 31 K Backream 90' on each stand UWT 435K, DWT 150K, RWT 250K SPRs - 23118' MD, 9259' TVD, MW 10.8 ppg SPR Pump #1 - 30 SPM 950 psi, 40 SPM 1070 psi SPR Pump #2 - 30 SPM 950 psi, 40 SPM 1070 psi Directional drill f/ 23224' to 23333' DPP 4270 psi, GPM 780, WOB 15 - 20K, RPM 140, TO on 35K, TO off 31 K Backream 90' on each stand UWT 435K, DWT 150K, RWT 250K Repair leak in stand pipe (change API ring) Directional drill f/ 23333' to 23460' DPP 4350 psi, GPM 778, WOB 10 - 20K, RPM 140, TO on 35K, TO off 31 K UWT 430K, DWT 145K, RWT 250K Circulate 6x BU until hole clean ~ 780 gpm & 150 rpm. Cuttings return on BU: 1x BU: 100% used as base line (same amount of cuttings as when drilling) 2x BU: 70% 3x BU: 50% 4x BU: 50% (very fine returns, coffee grounds size) 5x BU: 30% (very fine returns, coffee grounds size) 6x BU: 25% (very fine returns, coffee grounds size) Finish circulating hole clean. LD 1 jt. 5-7/8" DP. Prepared to POOH. POOH to 22923'. Pump dry job. Blow down top drive and mud lines Cont. POOH to 18420'. Observed overpull of 30k over worked pipe. Printed: 5/7/2007 11:24:17 AM gp Page 26 of34~ Operations Summary Report ,Legal Well Name: NS33 'Common Well Name: NS33 Spud Date: 1/29/2007 ''Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date From - To i Hours ~ Task Code NPT Phase Description of Operations 4/4/2007 09:00 - 12:00 3.00 DRILL P LNRi Circulate BU C~3 757 gpm working pipe ~ 150 rpm from 18517' to 18420' 12:00 - 13:30 1.50 DRILL P LNR1 POOH from 18420' to 18270' observing 30k to 60k overpull. Washed down back to 18420' 13:30 - 17:00 3.50 DRILL P LNR1 Back ream from 18420' to 17944' w/ 760 gpm and 140 rpm 17:00 - 19:00 2.00 DRILL P LNR1 Ciculate BU ~ 778 gpm and reciprocating 1 stand C~ 140 rpm 19:00 - 19:30 0.50 DRILL P LNR1 POOH from 17944' to 17630'. Observed 40k overpull 19:30 - 22:00 2.50 DRILL P LNR7 Back ream from 17630' to 17460' with tendency to pack off. Run back in hole to 17562'. 22:00 - 00:00 2.00 DRILL P LNR1 Stage pumps and circulate BU ~ 775 gpm reciprocating 1 stand ~ 140 rpm. 4/5/2007 00:00 - 00:30 0.50 DRILL P LNR1 Finished circulating BU. 00:30 - 01:30 1.00 DRILL N RREP LNR1 Replaced sheared bolt on stand pipe mounting bracket. Checked the other bolts. Keep circulating while doing this. 01:30 - 05:00 3.50 DRILL P LNR1 Cont. POOH to 17119' working pipe through tight spots. No 05:00 - 09:00 4.00 DRILL P LNR1 09:00 - 12:30 3.50 DRILL P LNR1 12:30 - 00:00 11.50 DRILL P LNR1 14/6/2007 100:00 - 12:00 I 12.001 DRILL I P 12:00 - 17:30 I 5.501 DRILL I P LNR1 LNR1 17:30 - 19:30 2.00 DRILL N RREP LNR1 19:30 - 00:00 4.50 DRILL P LNRi 14/7/2007 100:00 - 03:30 I 3.501 DRILL I P I I LNRt 03:30 - 12:00 I 8.501 DRILL I P I I LNR1 12:00 - 13:30 I 1.501 DRILL I P I I LNR1 13:30 - 16:00 I 2.50! DRILL I P I I LNR1 more progress at 17119'. Tried to establish circulation, tend to pack off. RIH to 17259' and establish circulation. Back reaming from .17259' to 17094'. Pack. off. RIH back to 17259' and establish circulation. Circulate. -Wash from 17259' to 18,320' ~ 250 GPM, 1000 psi. - RIH from 18,320' to 18,518'. No pumps. - Backream from 18,518' to 17,367'. 750 GPM, 3950 - 3500 psi, 140 RPM, TO 33 - 35K with occasional spikes to 42K. Rot wt 230K, ECD gradually dropping off each stand from 11.96 ppg @ 18,518' to 11.81 ppg @ 17,367'. Pack off at 17,670' and 17,388' -Backream from 17,367' to 17,084'. 750 GPM, 3500 - 3450 psi, 140 RPM, TO 27 - 31 K with occasional spikes to 40K. Rot wt 225-228K, ECD gradually dropping off each stand from 11.81 ppg ~ 17,367' to 11.76 ppg @ 17,186'. Pack off at 17,322', 17,186' and 17,084'. RIH to 17,147' -Backream from 17,147' to 17,080' at 245 gpm, 950 psi, 130 RPM, TO 33-35k, Rot wt 235-240k. @ 17,080' increase flow rate to 740 gpm and ream back down to 17,147' 3600 psi, 140 RPM, TO 30K. Rot wt 225k. Backream same stand from 17,147' to 17,080' X745 gpm, 3600 psi, 140 rpm, TO 32-35k, Rot wt. 225k. Pack off at 17,080'. Wash pipe leaked. Change out wash pipe. - Try to establish full flow rate. Estabilize rate at 230 gpm, 720 psi. Backream from 17,080' to 17,033' X230 gpm, 720 psi, 120 rpm, TO 27K, Rot. wt 225k. - Cont. backreaming to top of stand at 17,021' w/ 230 gpm, 720 psi. Try to increase pump rate. Pack off. Work pipe and try to establish full circulation. RIH to 17,160'. Establish pump rate ~ 743 gpm, 3650-3700 psi. - Backream from 17,160' to 17,081' @ 743 gpm, 3650-3700 psi, 140 RPM, TO 27-28k, Rot wt. 230k. Pack off. Reduce pump rate to 227 gpm and backream w/ 140 rpm to 16,670'. Pack off @ 16,851' and 16,676' - Cont. backreaming to 16,616'. Pack off. Attempt to gain circulation. POOH to 16,560'. Pull to 470k. (Rhino Reamer aprox. 30' above shoe) - RIH back to 16,633'. Stage pumps up to 730 gpm w/ 3650 Printed: 5/7/2007 11:24:17 AM i • gp Page 27 of 34 Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING t Rig Release: Rig Name: NABOBS 33E Rig Number: Date ~ From - To ~ Hours Task Code'; NPT Phase Description of Operations _~ - _ _ _- 4/7/2007 ~ 13:30 - 16:00 2.50 DRILL P ~ LNR1 psi. Circulate. Try to reciprocate pipe. Pack off. 16:00 - 00:00 8.00 DRILL P 4/8/2007 00:00 - 03:00 3.00 DRILL P 03:00 - 04:30 1.50 DRILL P 04:30 - 08:00 3.50 DRILL P 08:00 - 10:00 2.00 DRILL P 10:00 - 14:00 4.00 DRILL P 14:00 - 14:30 0.50 DRILL P 14:30 - 19:00 4.50 DRILL P 4/9/2007 4/10/2007 19:00 - 20:00 20:00 - 21:00 21:00 - 00:00 00:00 - 07:30 07:30 - 14:00 14:00 - 15:00 15:00 - 18:00 18:00 - 00:00 00:00 - 07:30 1.00 DRILL P 1.00 DRILL P 3.00 DRILL P 7.50 DRILL P 6.501 DRILL I P 1.00 DRILL P 3.00 DRILL P 6.00 DRILL P 7.50 DRILL P LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 07:30 - 09:30 2.00 DRILL P LNR1 09:30 - 13:00 3.50 DRILL N RREP LNR1 13:00 - 14:30 1.50 DRILL P LNR1 14:30 - 18:30 4.00 DRILL P LNR1 18:30 - 21:00 2,50 DRILL P LNR1 - Regain circulation and stage pumps to 520 gpm. Pack off. POOH to 16,546'. Pull to 450k (Rhino Reamer aprox. 43' above shoe). RIH back to 16,693'. Establish full rate to 750 gpm. - Circulate 2x BU @ 16,693' until hole clean @ 753 gpm, 3760-3900 psi, 140 rpm, TO 21-24k. First BU with -arge amount of very fine cuttings. Reduced by second BU. - POOH to 15,934' (shoe at 16,491'). PU 360-380k. Observed points of PU 450k in 3 stands. Worked pipe down. Pull again and PU back to 360-380k. - Cut and slip drilling line. Inspect and adjust brakes. Circulated at 600 gpm while cutting and slipping drilling line - Circulate ~ 15,927' w/ 835 gpm, 4517 psi. - POOH from 15,927' to 12,790' PU 335-470k from 15,927' to 15,170'. After that PU went to 340-360k and dropping as POOH. - Pump dry job. Blow down mud lines and top drive - Cont. POOH from 12,790' to 7,835'. No overpulls - PU weights tracking perform data around 0.25 FF. Prepared rig floor to LD drill pipe - Service top drive, blocks and crown. - Pull and LD 21 jts of 5-7/8" DP - Cont. pulling and LD 5" DP. 5" hydroclean DP coming out with wear and sand ring in top half of blades. - Cont. LD 5" DP. Total jts LD: 219. Deeper joints of 5" Hydroclean DP show less wear on the blades than first ones LD. - LD BHA #9. Jars came out with some pieces of metal from top sub lost. Rhino Reamer with sand ring on upper part (top of backream cutters). Stabilizer on top of Rhino Reamer w/ 1/2"undergauge. - Removed section of stand pipe manifold and took to welder shop. for repairs. - 5" Drill pipe management in pipe shed: taking drill pipe joints out which will be sent for hardbanding, bringing new joints in. - Clear rig floor. Pull wear bushing, inspect and reinstall - PU and MU BHA #10 - RIH on 5" DP, PU 1 x 1 from pipe shed - Cont. RIH on 5" DP, PU 1 x 1 from pipe shed. Total jtts run: 219 - Installed section of stand pipe manifold repaired. - Cont. RIH on 5-7/8" DP from derrick to 7,950' - Attempted to pressure test stand pipe manifold. Leaked in union on section repaired. Changed o-ring. Tested to 4,800 psi - Adjust link tilt, install light in derrick, grease wash pipe. - Cont. RIH on 5-7/8" DP from derrick to 9,942' - Break circulation and flow check MWD. Blow down lines - Cont. RIH on 5-7/8" DP from derrick to 14,996', filling pipe every 2,000' - PU and MU RTTS packer. RIH and set packer ~ 103'. Printed: 5/7/2007 11:24:17 AM • • g p Page 28 of 34 ~ Operations Summary Report ',Legal Well Name: NS33 'Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations '.,4/10/2007 18:30 - 21:00 2.50 DRILL P LNR1 Retrieve running tool. Test packer to 500 psi. Blow down lines 21:00 - 22:00 1.00 BOPSU P LNR1 -Pump out BOP stack. Pull wear bushing and install test plug 22:00 - 23:00 1.00 BOPSU P LNR1 - PU & MU test joint, TIW and dart valve. Fill BOP and choke line for test. 23:00 - 00:00 1.00 BOPSU P LNR1 -Testing BOP and related equipment to 250 / 5000 psi (annular to 3500 psi) per BP / AOGCC regulations. Test witnessed by WSL (Chacin) and Tourpusher (Ashley). Jeff Jones, AOGCC Inspector, waived witness of test. Testing to 5" DP. .4/11/2007 00:00 - 07:30 7.50 BOPSU P LNR1 -Test BOP and related equipment to 250 / 5000 psi (annular to 3500 psi) per BP / AOGCC regulations. Test witnessed by WSL (Chacin / Rockett) and Tourpusher (Ashley). Jeff Jones, ', AOGCC Inspector, waived witness of test. Test to 5" DP and i 5-7/8" DP. 07:30 - 08:00 0.50 BOPSU P LNR1 -Pull test plug. Install wear bushing 08:00 - 09:30 1.50 DRILL P LNR1 - RIH w! setting tool and retrieve RTTS packer. Pull packer and LD 09:30 - 14:00 4.50 DRILL P LNR1 -Rotate and wash down casing to 15,382' w/ 765 gpm. 14:00 - 15:00 1.00 DRILL P LNR1 -Circulate and change shaker screens 15:00 - 18:00 3.00 DRILL P LNR1 -Cont. rotating and washing down casing to the shoe. 18:00 - 19:30 1.50 DRILL P LNR1 -Circulate BU at the shoe. Clean returns at BU. 19:30 - 21:00 1.50 DRILL P LNR1 -RIH on elevators to 16,735'. Break circulation at 16735' and wash down to 16,770' where pack off. POOH to the shoe 21:00 - 00:00 3.00 DRILL N WAIT LNR1 -Safety stand down: Nabors personnel issues. Waited for crew change at midnight. 4/12/2007 00:00 - 04:00 4.00 DRILL P LNR1 -Establish circulation ~ 750 gpm. Wash down packing off li when coming out of the shoe. Pull back in the casing. Establish circulation ~ 650 gpm. Wash down again and pack off when coming out of the shoe. Pull back to the shoe. Try to run on elevators and slack off 15' from the shoe. Pull back to the shoe 04:00 - 22:00 18.00 DRILL P LNR1 - .Work down and condition hole to 17,000' as follows: run in hole each stand, backream the stand at 750 gpm and 140 rpm, ream the stand down again and repeat backreaming. Did this several times with each stand until being able to run with no pumps or rotation 22:00 - 00:00 2.00 DRILL P LNR1 -RIH from 17,000' to 19,021'. SO 130-160k. Fill pipe and break circulation ~ 17,962' 4/13/2007 00:00 - 04:30 4.50 DRILL P LNR1 -RIH from 19,021' to 22,684'. Fill pipe and break circulation every 10 stands. SO 130-160k. 04:30 - 08:00 3.50 DRILL P LNR1 -Wash down from 22,684' to 23460' 08:00 - 00:00 16.00 DRILL P LNR1 -Circulate and condition mud ~ 750 - 780 gpm. Reciprocate one stand while circualting ~ 170-180 RPM. Circulate 7x BU. Receiving new oil base mud from plant while circulating 4/14/2007 00:00 - 04:00 4.00 DRILL P LNR1 -Cont. circulating while finished receiving new oil base mud from plant. Pump and displace 612 bbls of new mud in open hole 04:00 - 13:00 9.00 DRILL P LNR1 -POOH from 23,460' to 17,368'. Tight spot. RIH to 17,680' 13:00 - 15:30 2.50 DRILL P LNR1 -Circulate and reciprocate pipe ~ 750 gpm, 180 RPM. 15:30 - 21:00 5.50 DRILL P LNRi -POOH to the shoe. RIH to 16,940', where run tight. Work stand from 16,905' - 17,005' with circulation and reaming until tight spots cleaned. Wash down to 17,290' 21:00 - 00:00 3.00 DRILL P LNR1 -Circulate 1.5x BU reciprocating stand ~ 750 gpm, 170 RPM. Printed: 5/7/2007 11:24:77 AM • gp Page 29 of 34 Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: ~ Date From - To Hours Task Code NPT Phase Description of Operations 4/14/2007 21:00 - 00:00 3.00 DRILL P LNR1 Blow down top drive and mud lines 4/15/2007 00:00 - 01:00 1.00 DRILL P LNR1 -POOH from 17,290' to 16,431' (shoe at 16,491'). No tight spots. 01:00 - 05:00 4.00 DRILL P LNR1 -Circulate 3x BU, reciprocating, @ 780 gpm and 135 RPM. Pump dry job. Blow down top drive and mud lines 05:00 - 12:30 7.50 DRILL P LNRi -POOH from 16,431' to 7080', racking back stands of 5-7/8" DP. LD ghost reamer 12:30 - 13:30 1.00 DRILL P LNR1 -Change elevators to 5". Set up rig floor to LD 5" DP to pipe shed 13:30 - 22:00 8.50 DRILL P LNR1 - LD 5" DP 1 x 1 to pipe shed. Total jtts LD: 219 22:00 - 00:00 2.00 DRILL P LNR1 - LD BHA #10 to pipe shed. Jars came out with damage in upper part of main body. 4/16/2007 00:00 - 02:00 2.00 DRILL P LNR1 -Finish LD BHA #10. Clear rig floor. 02:00 - 03:00 1.00 DRILL P LNR1 -Drain stack. Pull wear ring. Install test plug. 03:00 - 05:00 2.00 DRILL P LNR1 -Cut & slip drilling line 05:00 - 07:30 2.50 BOPSU P 07:30 - 13:00 5.50 CASE P 13:00 - 15:00 2.00 CASE P 15:00 - 00:00 I 9.001 CASE I P 4/17/2007 100:00 - 10:30 10.501 CASE I P 10:30 - 12:00 1.50 CASE P 12:00 - 13:30 1.50 CASE P 13:30 - 16:00 2.50 CASE P 16:00 - 16:30 0.50 CASE P 16:30 - 17:30 1.00 CASE P 17:30 - 18:00 0.50 CASE P 18:00 - 20:30 2.50 CASE P - Change top rams to 9-5/8" - Take 5" DP and BHA laid down out of pipe shed. LNR1 - RU to test ram door seals. Test door seals against annular preventer to 3500 psi. Pull test plug. Install wear bushing and LD test joint. LNR1 - RU equipment to run 9-5/8" liner. Finished bringing jtts needed in pipe shed. LNR1 -Make up 9-5/8" shoe track: shoe - 3 jjts liner -auto fill collar - 1 jtt liner -baffle sub -landing collar. Pump trough shoe track and check equipment. LNR1 - PU, MU and RIH 9-5/8" linerjjts to 4354'. Total jjts run at this point: 107. Check PU and SO weights: - @ 2,000': PU 150k, SO 140k - ~ 3,000': PU 175K, SO 160K - ~ 4,000': PU 195K, SO 170k LNR1 Run 9-5/8" liner, 175 total joints MU liner hanger, liner top packer & running tools Total overall length of liner & hanger assembly 7136' Record PU and SO weights every 1000' 5000' - PU 220k, SO 175k 6000' - PU 240k, SO 190k 7000' - PU 260k, SO 195k LNR1 RD casing running equipment Clear & clean rig floor LNRi Circulate 1 liner volume SPP 1000 psi (~ 250 GPM LNR1 PU 9 jts of 5" HWDP LNR1 Circulate through Liner &HWDP 4 BPM - 830 psi 5 BPM - 1000 psi LNR1 MU Baker Hyflo valve PU 3 jts of 5" HWDP LNR1 Change to 5-7/8" elevators LNR1 RIH w/ 9-5/8" liner on 5-7/8" DP RIH f/ 7518' to 12028' Record PU and SO weights every 1000' 8000' - PU 265k. SO 199k 9000' - PU 272k, SO 190k Printed: 5!I/2007 11:24:17 AM • g p Page 30 of 34 ~ Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date I From - To ~ Hours ; Task 'Code NPT Phase Description of Operations --- 4/17/2007 _ 18:00 - 20:30 i 2.50 ~ __ -- CASE P ~ LNR1 _- ___ _ - - - 10000' - PU 280k, SO 180k 20:30 - 21:00 0.50 CASE P LNR1 21:00 - 00:00 3.00 CASE P LNR1 4/18/2007 100:00 - 02:00 I 2.001 CASE I P I I LNRi 02:00 - 08:30 ~ 6.501 CASE N DPRB LNR1 08:30 - 23:00 I 14.501 CASE I N I DPRB I LNR1 23:00 - 00:00 I 1.001 CASE I N I DPRB I LNR1 4/19/2007 00:00 - 00:30 0.50 CASE N DPRB LNR1 00:30 - 02:30 2.00 CASE N DPRB LNR1 02:30 - 03:00 0.50 CASE N DPRB LNR1 03:00 - 07:00 4.00 CASE N DPRB LNR1 07:00 - 00:00 17.00 CASE N DPRB LNR1 4/20/2007 ~ 00:00 - 10:00 10.00 CASE N DPRB I LNR1 11000' - PU 297k, SO 178k 12000' - PU 315k, SO 185k Break circulation C~3 12028' RIH w/ 9-5/8" liner on 5-7/8" DP RIH f/ 12028' to 16413' Record PU and SO weights every 1000' 13000' - PU 325k, SO 185k 14000' - PU 340k, SO 190k 15000' - PU 355k. SO 185k 16000 - PU 380k, SO 190k 16413' - PU 385k, SO 195k RIH w/ 9-5/8" liner on 5-7/8" DP RIH f/ 16413' to 16940' Set down on tight spot /ledge Work liner Drop ball to close Hyflo valve, Hyflo valve closed Circulate & try to work liner through tight spot ~ 16940' SPP 975 psi ~ 195 GPM No progress, Wellbore packing off at times POH w/ 9-5/8" liner on 5-7/8" DP Monitor hole fill closely Slow pulling speed to prevent swabbing Monitor well 15 min, wellbore static Change to 5" elevators LD 3 jts of 5" HW DP POH w/ 3 stands of 5" HWDP LD Hyflo valve RU elevators, tongs, back up tongs to LD liner & casing PJSM to LD liner hanger LD 9-5/8" liner hanger & packer assembly PJSM to rig up tools to LD 9-5/8" casing RU elevators, spider & single joint compensator LD 9-5/8" casing, unable to break out w/ power tongs Breakout 3 joints with rig tongs, doing minor damage to jts Began steaming casing connections for 10-15 minutes Breaking out 9-5/8" casing w/ power tongs Total 9-5/8" laid down ~ midnight 75 jts Inspect elevators, tongs, spiders, all in good condition LD 9-5/8" casing, breaking out w/ power tongs Reduced steaming time on casing connections to 3-5 minutes Currently breaking out 9-5/8" casing w/ power tongs - no steam Total 9-5/8" laid down 170 jts RD equipment to lay down 9-5/8" casing Clear & clean rig floor RU side door elevators, cutters to cut shoe track joints Cut & LD 5 shoe track joints, Total jts laid down 175 Guide shoe had significant damage 8 jts damaged, 5 shoe track jts cut RD 9-5/8" handling equipment, tongs & false rotary C/O elevators, Clear & clean rig floor Drain stack, Pull wear bushing, Set test plug Remove 9-5/8" casing rams from upper preventers 10:00 - 12:00 2.00 CASE N DPRB LNR1 12:00 - 17:00 5.00 CASE N DPRB LNR1 17:00 - 19:00 19:00 - 20:00 20:00 - 23:30 2.00 CASE N 1.00 CASE N 3.50 CASE N DPRB LNR1 DPRB LNR1 DPRB LNR1 Printed: 5/7/2007 11:24:17 AM i gp Page 31 of 34 Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date i From - To I Hours I Task 4/20/2007 120:00 - 23:30 I 3.50 I CASE 23:30 - 00:00 I 0.501 CASE 4/21/2007 100:00 - 01:00 I 1.001 CASE 01:00 - 02:00 I 1.001 CASE 02:00 - 03:00 I 1.001 CASE 03:00 - 04:00 1.00 CASE 04:00 - 08:30 4.50 CASE 08:30 - 18:00 9.50 CASE 18:00 - 18:30 0.50 CASE 18:30 - 00:00 5.50 CASE 4/22/2007 00:00 - 02:00 2.00 CASE 02:00 - 03:00 1.00 CASE 03:00 - 04:30 1.50 CASE 04:30 - 07:30 3.00 CASE 07:30 - 09:00 1.50 CASE 09:00 - 10:00 I 1.001 CASE 10:00 - 22:30 I 12.501 CASE 22:30 - 00:00 I 1.501 CASE 4/23/2007 00:00 - 00:30 ~ 0.50 ~ CASE 00:30 - 01:30 1.00 CASE 01:30 - 03:30 2.00 CASE 03:30 - 06:00 I 2.501 CASE 06:00 - 07:30 I 1.50 I CASE Code; i NPT Phase Description of Operations N DPRB LNR1 Install 3.5" X 6" variable rams in upper preventers Cut & slip drilling line N DPRB LNRi Fill stack w/ fresh water PU/MU test joint N DPRB LNR1 Test doors on upper pipes after ram change out Test door seals to 3500 psi N DPRB LNR1 Pull & LD test plug, Install wear bushing LD test joint N DPRB LNR1 Drain fresh water from BOP stack Fill stack w/ MOBM N DPRB LNR1 Service top drive N DPRB LNR1 PU BHA, Shallow test MWD Test Rhino Reamer N DPRB LNR1 PU 5" DP & 5" HrdyaClean DP N DPRB LNR1 C/O elevators to 5-7/8" MU 10-5/8" string reamer Break circulation for 15 minutes N DPRB LNR1 TIH w/ 5-7/8" DP to 13344' N DPRB LNR1 TIH w/ 5-7/8" DP to 16491' N DPRB LNR1 Service top drive Replace pipe gripper dies N DPRB LNR1 Stage pumps to 670 GPM ~ 4285 psi N DPRB LNR1 Wellbore breathing, Bleed pressure f/ casing N DPRB LNR1 Circulate -SPP 460 psi C~ 128 GPM, Depth 16490' RPM 40, UWT 310K, DWT 180K, RWT 230K N DPRB LNR1 TIH (/16490' to 16682' Stage pumps to full rate, SPP 4150 psi C~ 700 GPM TIH f/ 16682' to 16833', Set down @ 16833' Ream to 16872', RPM 40, SPP 760 psi ~ 275 GPM Back ream full stand, 125 RPM, SPP 3500 psi C~1 650 GPM N DPRB LNR1 Ream f/ 16872' to 17160' Ream each stand down @ reduced pump rate Ream down -SPP 780 psi @ 275 GPM, RPM 40 Back ream each stand at full rate Back ream -SPP 3800 psi ~ 700 GPM, RPM 120 - 140 Ream each stand up & down 2 to 4 times N DPRB LNR1 RIH on elevators f/ 17160' to 17253' TOH f/ 17253' to 16677', UWT 370K Tight spot ~ 16836' -pulled 420k for 2' RIH f/ 16677' to 16965', Set down Could not work through w/o rotation & circulation N DPRB LNR1 Backream f/ 16969' to 16872' SPP 3300 psi C~ 700 GPM, RPM 140 N DPRB LNR1 TOH to 11-3/4" casing shoe -Top drive failure UWT 360k, DWT 160k N RREP LNR1 Troubleshoot & repair top drive Wire pulled loose on encoder Repair wires, top drive working fine N DPRB LNR1 RIH to 16682', Circulate 3 X BU SPP 3380 psi ~ 700 GPM, RPM 140 Reciprocate DP 90' Top drive failure, Pull to casing shoe N RREP LNR1 Replace encoder on top drive Printed: 5/7/2007 11:24:17 AM i ~ gp Page 32 of 34 Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date From - To !Hours Task ~ Code ~ NPT Phase Description of Operations 4/23/2007 07:30 - 09:30 2.00 CASE N DPRB LNR1 Finish circulating 3 X BU SPP 3380 psi fe? 700 GPM, RPM 140 UWT 360K, DWT 160K, RWT 240K 09:30 - 20:30 11.00 CASE N DPRB LNR1 Monitor well 10 minutes, well static TOH w/ 5-7/8" DP f/ 16682' to 7242' 20:30 - 21:00 0.50 CASE N DPRB LNR1 LD string reamer Change to 5" elevators 21:00 - 00:00 3.00 CASE N DPRB LNR1 LD 5" DP f/ 7242' to 5552' 4/24/2007 00:00 - 06:30 6.50 CASE N DPRB LNR1 LD 5" DP 06:30 - 11:00 4.50 CASE N DPRB LNR1 LD BHA 11:00 - 13:00 2.00 CASE N DPRB LNR1 Pull wear bushing, Set test plug MU test joint, connect hoses 13:00 - 15:00 2.00 CASE N DPRB LNR1 Measure bridle line in derrick Preparation for crown block work 15:00 - 21:00 6.00 CASE N DPRB LNR1 Testing BOP and related equipment to 250 / 5000 psi per BP / AOGCC regulations. Test witnessed by WSL (Leblanc, Dinger, Watkins) and Tourpusher (Dalton, Kennedy,Leigh). John Crisp, AOGCC Inspector, waived witness of test 21:00 - 23:00 2.00 CASE N DPRB LNR1 Pull & LD test plug, Install wear bushing LD test joint, Blow down stack & all choke & kill lines 23:00 - 00:00 1.00 CASE N DPRB LNR1 MU mule shoe & X-Over TIH w/ 5-7/8" DP, removing super-sliders 4/25/2007 00:00 - 09:00 9.00 CASE N DPRB LNR1 TIH w/ 5-7/8" DP, removing super-sliders 09:00 - 10:30 1.50 CASE N DPRB LNR1 Circulate 2X BU ~ 7968' SPP 685 psi ~ 650 GPM, RPM 120 10:30 - i 6:00 5.50 CASE N DPRB LNR1 TOH w/ 5-7/8" DP LD XO & mule shoe 16:00 - 17:00 1.00 CASE N DPRB LNR1 Clear & clean rig floor 17:00 - 19:30 2.50 CASE N DPRB LNR1 Slip & cut drilling line 19:30 - 22:00 2.50 CASE N DPRB LNR1 Service top drive, blocks, drawworks, iron roughneck 22:00 - 00:00 2.00 CASE N DPRB LNR1 MU XO & retainer setting tool RIH w/ setting tools & one stand -test run Could not get through wear bushing - 2 attempts Set down entire weight of 1 5-7/8" DP jt Pull & check wear bushing, wear bushing clear - OK Bow springs setting down in wear bushing 4/26/2007 00:00 - 01:00 1.00 REMCM N DPRB LNR1 MU top drive Push setting tool & bow springs through wear bushing Pull out, MU cement retainer RIH through wear bushing into 11-3/4" casing 01:00 - 15:30 14.50 REMCM N DPRB LNR1 TIH w/ cement retainer on 5-7/8" DP Break circulation for 15 min ~ 3824' SPP 230 psi @ 275 GPM Break circulation for 15 min ~ 8113' SPP 343 psi ~ 280 GPM Break circulation for 15 min @ 11938' SPP 465 psi ~ 284 GPM Break circulation for 15 min Q 16438' SPP 650 psi @ 296 GPM 15:30 - 16:30 1.00 REMCM N DPRB LNR1 Set EZSV Cement Retainer ~ 16415' Set 25k down on retainer to ensure set, Pressure test to 2500 psi for 5 minutes 16:30 - 17:00 0.50 REMCM N DPRB LNR1 Establish injection rate of 6 BPM ~ 1150 psi Printed: 5!7/2007 11:24:17 AM r gp Page 33 of 34 Operations Summary Report Legal Well Name: NS33 Common Well Name: NS33 Spud Date: 1/29/2007 Event Name: DRILL+COMPLETE Start: 1/22/2007 End: Contractor Name: NABOBS ALASKA DRI LLING I Rig Release: Rig Name: NABOBS 33E Rig Number: Date From - To Hours Task Code NPT Phase ~ Description of Operations 4/26/2007 16:30 - 17:00 0.50 REMCM N DPRB LNR1 Final injection rate of 6 BPM @ 1050 psi Unsling from cement retainer 17:00 - 18:00 1.00 REMCM N DPRB LNR1 Circulate through choke & mud/gas separator Determine max rate for cement job to be 4 BPM 18:00 - 18:30 0.50 REMCM N DPRB LNR1 MU head pin, LD 1 jt of DP 18:30 - 23:30 5.00 REMCM N DPRB LNR1 Circulate 1X BU, SPP 310 psi @ 250 GPM 23:30 - 00:00 0.50 REMCM N DPRB LNRi PU 1 jt of DP w/ head pin MU cement hose, prepare for cement job 4/27/2007 00:00 - 01:00 1.00 REMCM N DPRB LNR1 Sting into cement retainer, re-establish injection rate No communication w/ casing annulus Sting out of cement retainer, prepare to pump cement 01:00 - 02:00 1.00 REMCM N DPRB LNR1 Pump 15 bbls of 11.5 ppg spacer Test lines to 3000 psi, Test OK Repair small leak on suction line inside cement unit Pump 15 bbls of 11.5 ppg spacer (Total Spacer 30 bbls) 02:00 - 05:00 3.00 REMCM N DPRB LNR1 Open choke, close annular preventer Pump 228 bbls of LiteCrete lead cement Mixed to 12.5 ppg Pump 85 bbls of Class G tail cement Mixed to 15.8 ppg Sting back into cement retainer, Close choke, Adjust annular pressure Displace w/ 20 bbls of 11.5 ppg spacer pumped by DS Turnover to rig for displacement w/ MOBM Pump 366 bbls of MOBM, Shut down cement displacement Total displacement 386 bbls Unsling from EZSV, Drop cement 05:00 - 05:30 0.50 REMCM N DPRB LNR1 LD 1 single jt of DP Pull 2 stands of DP 05:30 - 12:00 6.50 REMCM N DPRB LNRi Circulate 2X BU, DPP 575 psi ~ 335 GPM Pressure test casing & cement plug to 2500 psi 12:00 - 00:00 12.00 REMCM N DPRB LNRi LD 5-7/8" DP f/ 16243' to 10817' 4/28/2007 00:00 - 05:30 5.50 REMCM N DPRB LNR1 LD 5-7/8" DP f/ 10817' to 6584' 05:30 - 07:30 2.00 REMCM N DPRB LNR1 DP started pulling wet Circulate BU ~ 6584' DPP 320 psi ~ 330 GPM 07:30 - 18:00 10.50 REMCM N DPRB LNR1 LD 5-7/8" DP f/ 6584' to surface Unload 5-7/8" DP from pipe shed 18:00 - 19:30 1.50 REMCM N DPRB LNR1 PJSM w/ Nabors & Schlumberger employees RU E-line equipment & tools 19:30 - 00:00 4.50 REMCM N DFAL LNR1 RIH w/ USIT/CCL to 5700' Log up, tool data is inferrior POH w/ a-line, tools in good condition, no junk or trash Surface test rotating sub - OK RIH to 1500', Test tools, data is unacceptable POH w/ a-line & tools 4/29/2007 00:00 - 02:00 2.00 REMCM N DFAL SURE POH w/ USIT/CCL tools Replace rotating sub on tool RIH to 1500', Test pull tool, No problems, Data Good RIH to 5700', Run USIT/CCL 02:00 - 07:00 5.00 REMCM N DPRB SURE RIH to 1500', test pull tool, no problems, data good. RIH to 5700', run USIT /CCL, POH 07:00 - 08:00 1.00 TA N DPRB SURE RD E-Line equipment & tools Printed: 5/7/2007 11:24:17 AM gp Page 34 of 34 Operations Summary Report Legal Well Name: NS33 Common W ell Name: NS33 Spud Date: 1/29/2007 Event Nam e: DRILL+C OMPLE TE Start : 1/22/2007 End: Contractor Name: NABOB S ALASK A DRI LLING I Rig Release: Rig Name; NABOB S 33E Rig Number: Date From - To ~ Hours Task Code' NPT Phase ! Description of Operations 4/29/2007 08:00 - 08:30 0.50 TA N DPRB SURE Pull & LD wear bushing 08:30 - 09:00 0.50 TA N DPRB SURE RU equipment to run 4-1/2" kill string 09:00 - 10:00 1.00 TA N DPRB SURE Test run tubing hanger into landing bowl No problems 10:00 - 18:00 8.00 TA N DPRB SURE Run WLEG, XN Nipple, Subs & 50 jts 4-1/2" 12.6# NSCT Tubing Kill string landed at 2142' w/ BPV in hanger Test hanger seal to 5000 psi Test BPV from below to 500 psi 18:00 - 00:00 6.00 TA P SURE Clean mud pits, Flush all mud lines Flush mud pumps & solids control equipment Flush & clean BOPE 4/30/2007 00:00 - 09:30 9.50 TA P SURE Clean mud pits & drip pans, Flush all mud lines Flush mud pumps & solids control equipment Flush & clean BOPE, Clean pit #1 09:30 - 14:00 4.50 TA P SURE Remove & clean pipe & blind rams ND riser, remove hydraulic lines Disconnect choke & kill lines ND BOPE and rack in cradle, Remove drlg spool 14:00 - 18:00 4.00 TA P SURE NU dry hole tree on NS33, Test to 2500 psi for 10 min NU dry hole tree on NS34, Test to 2500 psi for 10 min Clean cellar area 18:00 - 00:00 6.00 TA P SURE Disconnect mud lines to Mud Pump #3 Clean mud pit #1 Clean shaker room 5/1/2007 00:00 - 06:00 6.00 TA P SURE Disconnect mud lines to Mud Pump #3 Clean mud pit #1, Clean shaker room Prepare for rig move, Disconnect utilities from pipe rack Warm up rig moving system hydraulics Complete items from pre move checklist Hold ATP with Island personnel and PJSM with drilling crew for rig move. Release rig at 06:00 Printed: 5/7/2007 11:24:17 AM gp Page 1 of 1 Leak-Off Test Summary Legal Name: NS33 Common Name: NS33 Test Date Test Type Test Depth (TMD) ~ Test Depth (TVD) AMW Surtace Pressure i Leak Off Pressure (BHP) EMW 2/8/2007 FIT (ft) (ft) (ppg) (psi) (psi) (ppg) 2/14/2007 FIT 4,471.0 (ft) 3,195.0 (ft) 9.00 (ppg) 420 (psi) 1,914 (psi) 11.53 (ppg) 3/5/2007 FIT (ft) (ft) (ppg) (psi) (psi) 11.53 (ppg) 3/13/2007 FIT 16,491.0 (ft) 7,032.0 (ft) 9.20 (ppg} 1,220 (psi) 4,581 (psi) 12.54 (ppg) ~~ Printed: 5/7/2007 11:24:11 AM by .~`f°y~,~'.W:~ NS33PB1 Survey Report Report Date: 20•Apr-07 Survey / DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 307.910° Field: Northstar Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure /Slot: Northstar PF /NS33 TVD Reference Datum: Rotary Table Well: NS33 TVD Reference Elevation: 56.60 ft relative to MSL Borehole: NS33PB1 Sea Bed /Ground Level Elevation: 16.10 ft relative to MSL UWI/API#: 500292332570 Magnetic Declination: 24.153° Survey Name /Date: NS33PB1 /April 20, 2007 Total Field Strength: 57667.252 nT Tort /AHD / DDI / ERD ratio: 251.647° / 20308.88 ft / 7.110 / 2.205 Magnetic Dip: 81.064° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: January 29, 2007 Location LaUlong: N 70.49162367, W 148.69334368 Magnetic Declination Model: BGGM 2006 Location Grid NIE Y/X: N 6031141.300 ftUS, E 659820.740 ftUS North Reference: True North Grid Convergence Angle: +1.23166855° Total Corr Mag North -> True North: +24.153° Grid Scale Factor: 0.99992902 Local Coordinates Referenced To: Well Head a Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft n n ft de 100 ft ftUS ftUS RTE 0.0U U.UU 0.00 -b6.6U O,UU U.UU 0.VV U.UU U.UV U.UU U.UU 6U31141.3U 6bytS'1U./4 N /U.4`Jlt)Z3U/ VV 14if.6yJ:i436if GYD GC SS 50.00 0.70 18.25 -6.60 50.00 0.10 0.31 0.31 0.29 0.10 1.40 6031141.59 659820.83 N 70.49162447 W 148.69334290 100.00 0.62 18.15 43.40 100.00 0.30 0.88 0.88 0.84 0.28 0.16 6031142.14 659821.00 N 70.49162596 W 148.69334142 150.00 0.82 18.87 93.39 149.99 0.51 1.51 1.51 1.43 0.48 0.40 6031142.74 659821.18 N 70.49162759 W 148.69333979 208.00 1.14 324.05 151.38 207.98 1.19 2.43 2.31 2.29 0.27 1.63 6031143.60 659820.96 N 70.49162994 W 148.69334146 304.00 2.81 285.74 247.33 303.93 4.29 5.63 4.50 3.70 -2.55 2.13 6031144.95 659818.11 N 70.49163379 W 148.69336456 401.00 3.96 293.87 344.16 400.76 9.74 11.35 9.75 5.70 -7.91 1.28 6031146.83 659812.71 N 70.49163926 W 148.69340831 497.00 6.90 301.08 439.72 496.32 18.69 20.43 18.78 10.02 -15.88 3.14 6031150.98 659804.65 N 70.49165106 W 148.69347347 601.00 9.54 304.47 542.64 599.24 33.49 35.29 33.64 18.13 -28.34 2.58 6031158.81 659792.02 N 70.49167320 W 148.69357531 697.00 10.57 307.34 637.16 693.76 50.24 52.05 50.38 27.97 -41.90 1.19 6031168.36 659778.26 N 70.49170009 W 148.69368615 792.00 11.04 314.28 730.48 787.08 67.99 69.83 68.05 39.61 -55.34 1.46 6031179.71 659764.57 N 70.49173188 W 148.69379 889.00 13.58 313.64 825.25 881.85 88.56 90.51 88.56 53.95 -70.23 2.62 6031193.73 659749.37 N 70.49177107 W 148.6939 Last Gyro 984.00 16.40 309.47 917.01 973.61 113.07 115.07 113.07 70.18 -88.66 3.18 6031209.55 659730.60 N 70.49181539 W 148.69406 First MWD+IFR+MS 1107.67 19.19 310.74 1034.75 1091.35 150.83 152.86 150.85 94.55 -117.54 2.28 6031233.29 659701.20 N 70.49188196 W 148.69430451 1200.87 20.23 307.72 1122.49 1179.09 182.24 184.29 182.27 114.40 -141.89 1.56 6031252.62 659676.43 N 70.49193620 W 148.69450359 1297.20 17.22 306.36 1213.71 1270.31 213.16 215.21 213.17 133.05 -166.56 3.16 6031270.73 659651.37 N 70.49198714 W 148.69470520 1392.14 17.76 308.97 1304.26 1360.86 241.68 243.74 241.70 150.49 -189.13 1.00 6031287.68 659628.43 N 70.49203478 W 148.69488974 1489.08 19.49 308.60 1396.12 1452.72 272.64 274.70 272.66 169.88 -213.27 1.79 6031306.54 659603.89 N 70.49208775 W 148.69508704 1583.76 22.65 295.86 1484.51 1541.11 306.29 308.61 306.29 187.70 -242.04 5.86 6031323.74 659574.74 N 70.49213643 W 148.69532224 1679.62 25.69 300.32 1571.96 1628.56 344.95 347.84 345.02 206.24 -276.59 3.70 6031341.54 659539.80 N 70.49218709 W 148.69560473 1775.18 28.20 303.38 1657.14 1713.74 388.00 391.13 388.17 229.13 -313.34 3.00 6031363.62 659502.57 N 70.49224960 W 148.69590508 1871.48 29.67 303.16 1741.42 1798.02 434.43 437.72 434.71 254.68 -352.29 1.53 6031388.33 659463.08 N 70.49231941 W 148.69622353 1965.18 31.78 303.78 1821.96 1878.56 482.16 485.59 482.54 281.09 -392.22 2.28 6031413.88 659422.60 N 70.49239155 W 148.69654994 SurveyEditor Ver SP 2.1 Bld( doc40x_100) NS33\NS33\NS33P61\NS33P61 Generated 5/30/2007 11:41 AM Page 1 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitulie Depth Section Departure ft de de ft ft ft ft ft ft ft de 00 ft ftUS ftUS 1Ufi3.UEi ;i1. /;i :iUS. /5 lyU4./4 15(il.;i4 bt4.;i1 5:i/.ti"1 534. // :ilU.titi -4:ib.1L 1.45 tiU:i144L./4 Fiby:i/y.U/ N /V.4y'L4/Ly;S W 14t5.ti`JtiyUVliS 2157.37 34. 74 304. 82 1983.17 2039. 77 586. 63 590. 19 587. 14 341.13 -477. 88 2.20 6031472.05 659335.68 N 70.49255554 W 148.69725019 2253.42 37. 38 304. 31 2060.81 2117. 41 643. 06 646. 72 643. 66 373.19 -524. 43 2.77 6031503.11 659288.44 N 70.49264314 W 148.69763081 2347.98 40. 28 303. 68 2134.46 2191. 06 702. 21 706. 01 702. 93 406.33 -573. 59 3.10 6031535.18 659238.59 N 70.49273365 W 148.69803268 2444.14 43. 23 303. 68 2206.19 2262. 79 766. 06 770. 04 766. 94 441.84 -626. 87 3.07 6031569.53 659184.56 N 70.49283065 W 148.69846828 2538.11 44. 38 303. 92 2274.01 2330. 61 830. 94 835. 08 831. 96 478.02 -680. 92 1.24 6031604.54 659129.75 N 70.49292949 W 148.69891016 2634.34 46. 29 303. 90 2341.65 2398. 25 899. 21 903. 52 900. 39 516.21 -737. 72 1.98 6031641.49 659072.15 N 70.49303378 W 148.69937451 2729.10 49. 05 304. 09 2405.45 2462. 05 969. 10 973. 57 970. 43 555.37 -795. 80 2.92 6031679.40 659013.25 N 70.49314076 W 148.69984930 2824.67 51. 49 304. 31 2466.54 2523. 14 1042. 44 1047. 06 1043. 92 596.68 -856. 58 2.56 6031719.39 658951.60 N 70.49325360 W 148.70034625 2918.45 54. 73 304. 69 2522.82 2579. 42 1117. 30 1122. 06 1118. 91 639.17 -918. 38 3.47 6031760.53 658888.90 N 70.49336963 W 148.70085152 3013.08 56. 67 305. 69 2576.15 2632. 75 1195. 38 1200. 23 1197. 08 684.22 -982. 26 2.23 6031804.20 658824.07 N 70.49349269 W 148.70137378 3107.78 58. 29 307. 05 2627.06 2683. 66 1275. 20 1280. 07 1276. 90 731.57 -1046. 55 2.10 6031850.16 658758.79 N 70.49362204 W 148.7018 3204.32 60. 50 307. 14 2676.20 2732. 80 1358. 28 1363. 16 1359. 93 781.69 -1112. 82 2.29 6031898.83 658691.46 N 70.49375891 W 148.70244124 3299.88 61. 24 306. 69 2722.72 2779. 32 1441. 74 1446. 63 1443. 36 831.82 -1179. 56 0.88 6031947.52 658623.66 N 70.49389585 W 148.70298691 3395.36 63. 15 307. 33 2767.26 2823. 86 1526. 18 1531. 09 1527. 77 882.66 -1246. 99 2.09 6031996.89 658555.15 N 70.49403470 W 148.70353828 3492.63 65. 24 306. 99 2809.60 2866. 20 1613. 73 1618. 65 1615. 29 935.55 -1316. 78 2.17 6032048.27 658484.25 N 70.49417916 W 148.70410888 3588.44 67. 89 307. 18 2847.70 2904. 30 1701. 62 1706. 55 1703. 15 988.56 -1386. 90 2.77 6032099.75 658413.01 N 70.49432393 W 148.70468222 3685.50 69. 42 307. 17 2883.03 2939. 63 1792. 02 1796. 95 1793. 52 1043.18 -1458. 93 1.58 6032152.81 658339.83 N 70.49447312 W 148.70527119 3780.68 71. 96 308. 29 2914.50 2971. 10 1881. 83 1886. 77 1883. 27 1098.15 -1529. 96 2.89 6032206.23 658267.64 N 70.49462324 W 148.70585200 3876.89 72. 34 306. 40 2943.99 3000. 59 1973. 40 1978. 34 1974. 81 1153.70 -1602. 76 1.91 6032260.20 658193.67 N 70.49477495 W 148.70644730 3973.27 71. 34 305. 49 2974.03 3030. 63 2064. 92 2069. 92 2066. 38 1207.46 -1676. 90 1.37 6032312.35 658118.40 N 70.49492177 W 148.70705352 4069.13 70. 63 306. 64 3005.27 3061. 87 2155. 50 2160. 55 2157. 01 1260.81 -1750. 16 1.35 6032364.11 658044.01 N 70.49506747 W 148.70765257 4164.91 69.97 306.70 3037.55 4260.68 70.28 305.65 3070.11 4357.16 71.46 305.77 3101.73 4419.22 71.45 306.12 3121.47 4549.84 72.93 304.83 3161.42 4644.51 72.51 304.53 3189.54 4741.10 71.93 304.18 3219.04 4836.57 71.53 303.67 3248.96 4932.10 68.50 304.40 3281.61 5025.96 67.01 303.55 3317.14 5122.44 69.31 304,05 3353.03 5216.38 70.66 306,15 3385.19 5312.87 70.92 306.71 3416.94 5407.43 71.34 307.96 3447.52 5503.39 71.91 307.63 3477.77 5596.99 72.44 306.94 3506.42 5694.64 72.64 307.22 3535.72 5789.14 71.29 307.01 3564.98 5884.00 70.30 307.40 3596.18 3094.15 2245. 66 2250. 72 2247.17 1314.66 -1822. 49 0.69 6032416.39 657970.55 N 70.49521454 W 148.70824401 3126. 71 2335. 68 2340. 79 2337. 24 1367.82 -1895. 19 1.08 6032467.97 657896.73 N 70.49535971 W 148.70883852 3158. 33 2426. 76 2431. 94 2428. 39 1421.02 -1969. 20 1.23 6032519.57 657821.60 N 70.49550500 W 148.70944375 3178. 07 2485. 57 2490. 78 2487. 22 1455.56 -2016. 83 0.53 6032553.07 657773.23 N 70.49559932 W 148.70983327 3218. 02 2609. 81 2615. 13 2611. 57 1527.72 -2118. 11 1.47 6032623.03 657670.44 N 70.49579639 W 148.71066145 3246. 14 2700. 06 2705. 53 2701. 95 1579.16 -2192. 44 0.54 6032672.86 657595.02 N 70.49593684 W 148.71126936 3275. 64 2791. 86 2797. 51 2793. 90 1631.06 -2268. 38 0.69 6032723.11 657518.00 N 70.49607857 W 148.711 3305. 56 2882. 30 2888. 16 2884. 52 1681.66 -2343. 60 0.66 6032772.08 657441.71 8 N 70.49621673 W 148.7125 3338. 21 2971. 86 2977. 93 2974. 25 1731.90 -2417. 99 3.25 6032820.70 657366.26 N 70.49635391 W 148.71311386 3373. 74 3058. 52 3064. 80 3061. 08 1780.45 -2490. 03 1.80 6032867.69 657293.20 N 70.49648648 W 148.71370300 3409. 63 3147. 84 3154. 35 3150. 59 1830.26 -2564. 44 2.43 6032915.89 657217.74 N 70.49662250 W 148.71431156 3441. 79 3235. 99 3242. 61 3238. 85 1881.02 -2636. 65 2.54 6032965.08 657144.47 N 70.49676109 W 148.71490208 3473. 54 3327. 08 3333. 73 3329. 95 1935.13 -2709. 96 0.61 6033017.59 657070.01 N 70.49690884 W 148.71550166 3504. 12 3416. 55 3423. 21 3419. 39 1989.39 -2781. 10 1.33 6033070.31 656997.73 N 70.49705701 W 148.71608352 3534. 37 3507. 62 3514. 28 3510. 39 2045.20 -2853. 06 0.68 6033124.56 656924.59 N 70.49720940 W 148.71667209 3563. 02 3596. 72 3603. 38 3599. 46 2099.18 -2923. 96 0.90 6033177.00 656852.55 N 70.49735678 W 148.71725196 3592. 32 3689. 86 3696. 53 3692. 58 2155.34 -2998. 27 0.34 6033231.55 656777.05 N 70.49751013 W 148.71785979 3621. 58 3779. 71 3786. 39 3782. 41 2209.56 -3069. 92 1.44 6033284.21 656704.26 N 70.49765818 W 148.71844586 3652. 78 3869. 28 3875. 97 3871. 96 2263.73 -3141. 27 1.11 6033336.82 656631.77 N 70.49780607 W 148.71902945 SurveyEditor Ver SP 2.1 Bld( doc40x_100) NS33\NS33\NS33P81\NS33P81 Generated 5/30/2007 11:41 AM Page 2 of 7 Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longituffe Depth Section Departure ft de de ft ft it ft ft ft ft de 100 ft ftUS ftUS by/13.;34 tiy.y5 :iUt3.l5 ;3Fi12i.L5 :i6t34.t35 :3y5t3.UU :3yEi4.6y :iy(3U.E3:3 1;31t3.Utf -:3111.40 U.t33 6U3:3:it3y.(ib E3bEibt3U.4y N /U.4y/y5445 W 1413./lyFiU3U6 6074.58 70.12 309.43 3661.12 3717.72 4048.44 4055. 14 4050. 96 2374.74 -3281.90 1.26 6033444.78 656488.79 N 70.49810917 W 148.72017977 6170.41 70.28 311.10 3693.58 3750.18 4138.53 4145. 31 4140. 86 2433.02 -3350.70 1.65 6033501.56 656418.76 N 70.49826829 W 148.72074254 6265.74 70.31 310.90 3725.72 3782.32 4228.14 4235. 06 4230. 28 2491.90 -3418.43 0.20 6033558.96 656349.79 N 70.49842905 W 148.72129662 6360.36 70.61 311.11 3757.37 3813.97 4317.18 4324. 23 4319. 13 2550.40 -3485.73 0.38 6033616.01 656281.26 N 70.49858880 W 148.72184710 6455.96 70.83 311.59 3788.94 3845.54 4407.26 4414. 46 4409. 01 2610.02 -3553.47 0.53 6033674.15 656212.26 N 70.49875158 W 148.72240126 6550.05 70.85 311.66 3819.82 3876.42 4495.95 4503. 34 4497. 51 2669.06 -3619.90 0.07 6033731.74 656144.57 N 70.49891277 W 148.72294477 6645.97 70.89 312.05 385f.25 3907.85 4586.36 4593. 97 4587. 73 2729.52 -3687.40 0.39 6033790.74 656075.79 N 70.49907787 W 148.72349698 6739.57 70.49 312.16 3882.20 3938.80 4674.46 4682. 30 4675. 65 2788.75 -3752.94 0.44 6033848.54 656009.00 N 70.49923958 W 148.72403314 6837.35 71.23 312.74 3914.26 3970.86 4766.54 4774. 67 4767. 55 2851.10 -3821.10 0.94 6033909.40 655939.52 N 70.49940982 W 148.72459077 6932.26 71.74 310.90 3944.40 4001.00 4856.32 4864. 67 4857. 20 2911.10 -3888.17 1.92 6033967.95 655871.19 N 70.49957365 W 148.72513947 7 7028.96 72.17 309.22 3974.36 4030.96 4948.20 4956. 61 4948. 99 2970.27 -3958.54 1.71 6034025.59 655799.57 N 70.49973519 W 148.725 7123.95 71.44 307.13 4004.02 4060.62 5038.43 5046. 85 5039. 20 3026.05 -4029.47 2.23 6034079.82 655727.46 N 70.49988745 W 148.72629549 7219.63 71.07 306.21 4034.77 4091.37 5129.01 5137. 46 5129. 81 3080.16 -4102.14 0.99 6034132.35 655653.64 N 70.50003516 W 148.72689002 7316.13 70.65 305.64 4066.41 4123.01 5220.12 5228. 62 5220. 96 3133.65 -4175.96 0.71 6034184.24 655578.69 N 70.50018118 W 148.72749398 7412.82 71.19 306.62 4098.02 4154.62 5311.46 5320. 00 5312. 33 3187.52 -4249.77 1.11 6034236.51 655503.76 N 70.50032825 W 148.72809777 7509.44 70.64 307.21 4129.61 4186.21 5402.75 5411. 31 5403. 64 3242.37 -4322.77 0.81 6034289.77 655429.59 N 70.50047796 W 148.72869505 7605.93 71.88 308.73 4160.61 4217.21 5494.12 5502. 68 5494. 99 3298.59 -4394.80 1.97 6034344.42 655356.38 N 70.50063142 W 148.72928436 7700.90 71.02 308.49 4190.82 4247.42 5584.15 5592. 71 5584. 98 3354.77 -4465.15 0.94 6034399.08 655284.84 N 70.50078479 W 148.72985999 7797.40 72.19 308.31 4221.28 4277.88 5675.71 5684. 28 5676. 52 3411.65 -4536.91 1.23 6034454.39 655211.88 N 70.50094005 W 148.73044714 7893.09 72.17 305.76 4250.56 4307.16 5766.79 5775. 38 5767. 61 3466.51 -4609.63 2.54 6034507.68 655138.01 N 70.50108981 W 148.73104209 7989.93 71.63 304.37 4280.65 4337.25 5858.72 5867. 43 5859. 61 3519.39 -4684.96 1.47 6034558.93 655061.56 N 70.50123415 W 148.73165849 8085.80 71.31 304.51 4311.12 4367.72 5949.46 5958. 33 5950. 42 3570.80 -4759.93 0.36 6034608.71 654985.51 N 70.50137446 W 148.73227185 8182.54 70.94 306.30 4342.42 4399.02 6040.90 6049. 86 6041. 93 3623.83 -4834.54 1.79 6034660.12 654909.78 N 70.50151920 W 148.73288230 8278.96 70.89 307.94 4373.95 4430.55 6132.01 6140. 98 6133. 04 3678.82 -4907.19 1.61 6034713.52 654835.97 N 70.50166928 W 148.73347679 8375.87 71.04 309.37 4405.55 4462.15 6223.61 6232. 59 6224. 61 3736.04 -4978.73 1.40 6034769.19 654763.22 N 70.50182548 W 148,73406217 8473.24 71.28 309.82 4437.00 4493.60 6315.72 6324. 75 6316. 66 3794.77 -5049.74 0.50 6034826.38 654690.97 N 70.50198580 W 148.73464325 8570.30 71.41 309.93 4468.04 4524.64 6407.63 6416. 71 6408. 50 3853.73 -5120.32 0.17 6034883.80 654619.15 N 70.50214673 W 148.73522078 8666.53 71.41 309.71 4498.72 4555.32 6498.79 6507. 92 6499. 60 3912.14 -5190.37 0.22 6034940.69 654547.86 N 70.50230616 W 148.7357 8763.43 71.27 309.92 4529.72 4586.32 6590.54 6599. 72 6591. 29 3970.92 -5260.89 0.25 6034997.94 654476.10 N 70.50246662 W 148.7363 8860.74 71.55 310.73 4560.75 4617.35 6682.69 6691. 96 6683. 38 4030.61 -5331.20 0.84 6035056.10 654404.53 N 70.50262954 W 148.73694659 8957.60 71.95 310.33 4591.08 4647.68 6774.58 6783. 94 6775. 20 4090.38 -5401.12 0.57 6035114.35 654333.35 N 70.50279270 W 148.73751878 9053.76 72.16 310.11 4620.71 4677.31 6865.99 6875. 43 6866. 55 4149.46 -5470.97 0.31 6035171.90 654262.24 N 70.50295394 W 148.73809046 9151.80 72.25 309.92 4650.67 4707.27 6959.28 6968. 77 6959. 79 4209.48 -5542.47 0.21 6035230.37 654189.48 N 70.50311777 W 148.73867557 9245.98 72.09 308.62 4679.51 4736.11 7048.91 7058. 43 7049. 39 4266.23 -5611.87 1.32 6035285.61 654118.88 N 70.50327266 W 148.73924361 9342.91 71.93 308.46 4709.44 4766.04 7141.09 7150. 62 7141. 55 4323.67 -5683.98 0.23 6035341.49 654045.55 N 70.50342943 W 148.73983375 9438.47 72.03 308.19 4739.01 4795.61 7231.96 7241.49 7232.41 4380.02 -575527 0.29 6035396.29 653973 .07 N 70.50358322 W 148.74041720 9535.10 72.11 307.85 4768.75 4825.35 7323.90 7333.43 7324.34 4436.65 -5827.70 0.34 6035451.34 653899 .45 N 70.50373777 W 148.74100996 9631.99 71.35 307.66 4799.13 4855.73 7415.90 7425.44 7416.34 4492.98 -5900.44 0.81 6035506.09 653825 .52 N 70.50389151 W 148.74160531 9727.10 71.29 308.51 4829.59 4886.19 7506.00 7515.54 7506.43 4548.56 -5971.36 0.85 6035560.13 653753 .43 N 70.50404318 W 148.74218572 9821.98 71.96 308.44 4859.50 4916.10 7596.04 7605.58 7596.45 4604.58 -6041.85 0.71 6035614.62 653681 .76 N 70.50419607 W 148.74276268 SurveyEditor Ver SP 2.1 Bld( doc40x_100 ) NS33\NS33\NS33PB1 \NS33P61 Generated 5/30/200711:41 AM Page 3 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitd6e Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS 9917.63 72.20 308. 05 4888. 93 4945. 53 7687.05 7696. 59 7687. 45 4660.92 -6113.33 0.46 6035669 .40 653609.09 N 70.50434981 W 148.74334769 10014.11 72.37 307. 39 4918. 29 4974. 89 7778. 95 7788. 49 7779. 35 4717.14 -6186.03 0.68 6035724 .05 653535.21 N 70.50450325 W 148.74394270 10108.88 72.15 305. 98 4947. 17 5003. 77 7869. 19 7878. 76 7869. 61 4771.07 -6258.41 1.44 6035776 .40 653461.69 N 70.50465040 W 148.74453513 10205.59 72.00 305. 86 4976. 93 5033. 53 7961. 15 7970. 77 7961. 60 4825.05 -6332.93 0.19 6035828 .76 653386.03 N 70.50479770 W 148.74514504 10303.39 71.82 305. 75 5007. 30 5063. 90 8054. 06 8063. 74 8054. 53 4879.44 -6408.32 0.21 6035881. 52 653309.49 N 70.50494610 W 148.74576214 10369.58 71.61 305. 82 5028. 07 5084. 67 8116. 86 8126. 59 8117. 36 4916.19 -6459.31 0.33 6035917. 16 653257.73 N 70.50504638 W 148.74617943 10466.92 71.25 305. 76 5059. 06 5115. 66 8209. 07 8218. 86 8209. 60 4970.15 -6534.15 0.37 6035969. 50 653181.75 N 70.50519362 W 148.74679206 10561.56 70.75 306. 78 5089. 88 5146. 48 8298. 51 8308. 34 8299. 07 5023.08 -6606.30 1.15 6036020. 86 653108.49 N 70.50533806 W 148.74738258 10657.88 70.53 307. 47 5121. 81 5178. 41 8389. 38 8399. 21 8389. 94 5077.93 -6678.75 0.71 6036074. 14 653034.87 N 70.50548771 W 148.74797565 10753.55 70.95 308. 27 5153. 37 5209. 97 8479. 69 8489. 53 8480. 25 5133.37 -6750.05 0.90 6036128. 03 652962.41 N 70.50563900 W 148.74855925 10849.33 71.18 308. 83 5184. 45 5241. 05 8570. 28 8580. 13 8570. 82 5189.83 -6820.90 0.60 6036182. 95 652890.37 N 70.50579306 W 148.7491 10943.42 70.49 309. 50 5215. 33 5271. 93 8659. 14 8669. 00 8659. 65 5245.96 -6889.81 1.00 6036237. 58 652820.27 N 70.50594622 W 148.7497 11039.36 70.97 309. 75 5247. 00 5303. 60 8749. 66 8759. 56 8750. 14 5303.72 -6959.56 0.56 6036293. 82 652749.30 N 70.50610383 W 148.75027440 11133.65 71.81 310. 13 5277. 09 5333. 69 8838. 96 8848. 92 8839. 41 5361.09 -7028.08 0.97 6036349. 70 652679.57 N 70.50626038 W 148.75083529 11230.99 72.25 309. 70 5307. 12 5363. 72 8931. 50 8941. 52 8931. 90 5420.50 -7099.09 0.62 6036407. 57 652607.30 N 70.50642250 W 148.75141669 11324.52 71.95 309. 61 5335. 86 5392. 46 9020. 46 9030. 52 9020. 84 5477.30 -7167.62 0.33 6036462. 87 652537.58 N 70.50657748 W 148.75197768 11420.47 71.09 309. 96 5366. 28 5422. 88 9111. 41 9121. 52 9111. 76 5535.53 -7237.55 0.96 6036519. 58 652466.42 N 70.50673638 W 148.75255021 11513.95 71.34 309. 82 5396. 38 5452. 98 9199. 86 9210. 02 9200. 18 5592.28 -7305.45 0.30 6036574. 86 652397.31 N 70.50689125 W 148.75310615 11610.41 71.74 309. 71 5426. 92 5483. 52 9291. 31 9301. 52 9291. 60 5650.81 -7375.78 0.43 6036631. 86 652325.74 N 70.50705094 W 148.75368197 11704.45 71.18 309. 07 5456. 83 5513. 43 9380. 44 9390. 68 9380. 71 5707.39 -7444.69 0.88 6036686. 94 652255.64 N 70.50720533 W 148.75424612 11801.85 71.07 308. 05 5488. 34 5544. 94 9472. 59 9482. 84 9472. 85 5764.84 -7516.75 1.00 6036742. 82 652182.37 N 70.50736207 W 148.75483614 11896.42 70.67 307. 24 5519. 33 5575. 93 9561. 94 9572. 18 9562. 20 5819.41 -7587.50 0.91 6036795. 86 652110.47 N 70.50751095 W 148.75541534 11992.21 70.63 307. 10 5551. 07 5607. 67 9652. 31 9662. 56 9652. 58 5874.01 -7659.52 0.14 6036848. 90 652037.30 N 70.50765992 W 148.75600497 12086.53 69.77 307. 40 5583. 02 5639. 62 9741. 05 9751. 31 9741. 32 5927.73 -7730.16 0.96 6036901. 08 651965.53 N 70.50780646 W 148.75658332 12173.76 69.48 306. 92 5613. 39 5669. 99 9822. 81 9833. 08 9823. 09 5977.12 -7795.32 0.61 6036949. 06 651899.32 N 70.50794122 W 148.75711688 12267.63 71.06 306. 77 5645. 07 5701. 67 9911. 15 9921. 44 9911. 44 6030.10 -7866.03 1.69 6037000. 50 651827.49 N 70.50808576 W 148.75769580 12362.38 72.05 307. 92 5675. 05 5731. 65 10001. 03 10011. 32 10001. 32 6084.63 -7937.49 1.55 6037053. 47 651754.89 N 70.50823450 W 148.75828083 12457.77 72.08 307. 69 5704. 43 5761. 03 10091. 78 10102. 07 10092. 07 6140.26 -8009.19 0.23 6037107. 55 651682.01 N 70.50838627 W 148.75886795 12553.83 72.13 306. 81 5733. 95 5790. 55 10183. 19 10193. 48 10183. 48 6195.59 -8081.95 0.87 6037161. 30 651608.08 N 70.50853721 W 148.759 12647.84 72.14 305. 84 5762. 79 5819. 39 10272. 63 10282. 96 10272. 94 6248.59 -8154.04 0.98 6037212. 73 651534.87 4 N 70.50868179 W 148.7600 12743.86 72.71 304. 84 5791. 78 5848. 38 10364. 07 10374. 50 10364. 41 6301.54 -8228.71 1. i 6 6037264. 06 651459.09 N 70.50882620 W 148.76066535 12837.85 72.16 304. 78 5820. 14 5876. 74 10453. 55 10464. 11 10453. 93 6352.69 -8302.28 0.59 6037313. 61 651384.44 N 70.50896572 W 148.76126773 12934.40 71.93 304. 48 5849. 91 5906. 51 10545. 25 10555. 95 10545. 67 6404.89 -8377.86 0.38 6037364. 17 651307.76 N 70.50910808 W 148.76188653 13028.93 72.49 304. 47 5878. 79 5935. 39 10635. 09 10645. 96 10635. 56 6455.84 -8452.06 0.59 6037413. 51 651232.49 N 70.50924704 W 148.76249407 13125.17 71.67 304. 58 5908. 40 5965. 00 10726. 50 10737. 53 10727. 02 6507.73 -8527.50 0.86 6037463. 77 651155.95 N 70.50938859 W 148.76311180 13221.59 71.81 305. 14 5938. 61 5995. 21 10817. 94 10829. 10 10818. 50 6560.07 -8602.64 0.57 6037514. 48 651079.72 N 70.50953132 W 148.76372700 13318.78 71.64 305. 57 5969. 09 6025. 69 10910. 14 10921. 39 10910. 73 6613.47 -8677.91 0.46 6037566. 24 651003.33 N 70.50967697 W 148.76434332 13414.41 71.65 306. 02 5999. 20 6055. 80 11000. 84 11012. 15 11001. 46 6666.56 -8751.53 0.45 6037617. 73 650928.59 N 70.50982176 W 148.76494617 13510.61 71.97 307. 04 6029, 24 6085. 84 11092. 20 11103. 54 11092. 85 6720.96 -8824.96 1.06 6037670. 54 650854.00 N 70.50997014 W 148.76554753 13609.73 71.61 307. 56 6060. 21 6116. 81 11186. 35 11197. 70 11187. 00 6778.02 -8899.86 0.62 6037725. 97 650777.90 N 70.51012577 W 148.76616089 SurveyEditor Ver SP 2.1 Bld( doc40x_100) NS33\NS33\NS33PB1\NS33PB1 Generated 5/30/2007 11:41 AM Page 4 of 7 Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft N ft n n ft de 00 ft ftUS ftUS 13704.22 71.58 308.55 6090.05 6146.65 11276.01 11287.35 11276.65 6833.28 -8970.46 0.99 6037779.70 13802.00 71.97 308.74 6120.63 6177.23 11368.87 11380.23 11369.50 6891.28 -9043.00 0.44 6037836.12 13897.38 71.73 309.60 6150.34 6206.94 11459.49 11470.86 11460.08 6948.53 -9113.26 0.89 6037891.84 13999.98 71.58 309.86 6182.63 6239.23 11556.82 11568.25 11557.39 7010.77 -9188.16 0.28 6037952.46 14089.86 71.66 308.99 6210.97 6267.57 11642.09 11653.54 11642.62 7064.94 -9254.04 0.92 6038005.19 14186.84 71.48 308.59 6241.63 6298.23 11734.08 11745.55 11734.60 7122.58 -9325.76 0.43 6038061.27 14283.28 71.73 307.75 6272.06 6328.66 11825.59 11837.06 11826.10 7179.13 -9397.70 0.87 6038116.26 14380.03 71.51 307.06 6302.57 6359.17 11917.40 11928.88 11917.92 7234.90 -9470.63 0.71 6038170.45 14475.72 71.78 306.54 6332.71 6389.31 12008.21 12019.70 12008.73 7289.31 -9543.36 0.59 6038223.27 14572.77 71.67 306.00 6363,14 6419.74 12100.32 12111.85 12100.87 7343.82 -9617.66 0.54 6038276.18 14669.46 71.90 304.86 6393.36 6449.96 12192.08 12203.70 12192.66 7397.07 -9692.49 1.14 6038327.79 14766.64 71.94 305.35 6423.52 6480.12 12284.35 12296.08 12284.97 7450.19 -9768.07 0.48 6038379.28 14861.55 71.42 305.95 6453.35 6509.95 12374.38 12386.18 12375.03 7502.70 -9841.28 0.81 6038430.20 14958.70 71.31 306.13 6484.40 6541.00 12466.39 12478.23 12467.07 7556.87 -9915.72 0.21 6038482.75 15055.87 71.30 305.50 6515.54 6572.14 12558.37 12570.28 12559.08 7610.73 -9990.36 0.61 6038534.99 15151.77 71.19 304.89 6546.38 6602.98 12649.07 12661.09 12649.82 7663.06 -10064.57 0.61 6038585.71 15248.40 71.23 304.48 6577.50 6634.10 12740.41 12752.57 12741.21 7715.12 -10139.79 0.40 6038636.14 15342.88 71.25 302.77 6607.89 6664.49 12829.61 12842.03 12830.49 7764.66 -10214.28 1.71 6038684.06 15439.97 71.50 302.07 6638.90 6695.50 12921.20 12934.03 12922.17 7813.98 -10291.94 0.73 6038731.70 15535.54 71.71 301.97 6669.06 6725.66 13011.40 13024.72 13012.49 7862.07 -10368.83 0.24 6038778.12 15632.25 71.33 300.97 6699.71 6756.31 13102.55 13116.44 13103.76 7909.95 -10447.06 1.06 6038824.30 15728.15 71.42 300.96 6730.34 6786.94 13192.76 13207.32 13194.11 7956.71 -10524.99 0.09 6038869.37 15824.87 71.38 301.51 6761.19 6817.79 13283.80 13298.99 13285.31 8004.24 -10603.37 0.54 6038915.21 15920.76 71.31 301.75 6791.86 6848.46 13374.11 13389.84 13375.76 8051.89 -10680.73 0.25 6038961.18 16017.14 71.48 302.46 6822.61 6879.21 13464.99 13481.18 13466.77 8100.44 -10758.10 0.72 6039008.05 16113.70 71.21 303.37 6853.50 6910.10 13556.12 13572.67 13558.02 8150.15 -10834.90 0.94 6039056.09 16210.44 71.37 304.79 6884.53 6941.13 13647.54 13664.29 13649.53 8201.49 -10910.79 1.40 6039105.79 16308.76 71.31 306.79 6915.99 6972.59 13740.63 13757.45 13742.66 8255.96 -10986.35 1.93 6039158.62 16369.67 71.38 308.10 6935.48 6992.08 13798.33 13815.15 13800.37 8291.05 -11032.16 2.04 6039192.71 16547.61 70.48 309.71 6993.62 7050.22 13966.47 13983.33 13968.43 8396.66 -11163.03 0.99 6039295.47 16662.53 70.19 311.00 7032.29 7088.89 14074.59 14091.54 14076.46 8466.73 -11245.50 1.09 6039363.75 16758.38 69.77 311.97 7065.11 7121.71 14164.47 14181.60 14166.24 8526.38 -11312.96 1.05 6039421.94 16853.22 69.86 313.08 7097.83 7154.43 14253.20 14270.62 14254.84 8586.55 -11378.56 1.10 6039480.68 16950.42 70.04 314.27 7131.16 7187.76 14344.04 14361.92 14345.54 8649.60 -11444.60 1.16 6039542.29 17046.27 70.37 315.14 7163.62 7220.22 14433.59 14452.11 14434.93 8713.05 -11508.70 0.92 6039604.34 17138.02 71.40 315.36 7193. 66 7250. 26 14519 .57 14538. 80 14520. 76 8774.61 -11569.73 1.15 6039664. 57 17235.62 71.43 314.48 7224. 77 7281. 37 14611 .39 14631. 31 14612. 43 8839.93 -11635.24 0.86 6039728. 47 17336.03 71.58 312.62 7256. 62 7313. 22 14706 .15 14726. 53 14707. 07 8905.54 -11704.25 1.76 6039792. 57 17422.08 71.52 311.71 7283. 86 7340. 46 14787 .55 14808. 16 14788. 40 8960.33 -11764.75 1.01 6039846. 04 17529.81 71.31 310.67 7318. 19 7374. 79 14889 .49 14910. 27 14890. 28 9027.58 -11841.59 0.94 6039911. 62 17627.09 71.19 309.80 7349. 46 7406. 06 14981 .53 15002. 39 14982. 28 9087.08 -11911.91 0.86 6039969. 59 650706.14 N 70.51027651 W 148.76673905 650632.38 N 70.51043472 W 148.76733312 650560.90 N 70.51059087 W 148.76790861 650484.69 N 70.51076067 W 148.76852204 650417.66 N 70.51090842 W 148.76906168 650344.73 N 70.51106564 W 148.76964904 650271.59 N 70.51121989 W 148.77023829 650197.48 N 70.51137200 W 148.77083563 650123.61 N 70.51152037 W 148.77143125 650048.16 N 70.51166904 W 148.77203977 649972.21 N 70.51181423 W 148.77265268 649895.51 N 70.51195909 W 148.7732 649821.19 N 70.51210228 W 148.7738 649745.61 N 70.51224998 W 148.77448100 649669.84 N 70.51239684 W 148.77509234 649594.53 N 70.51253955 W 148.77570014 649518.21 N 70.51268149 W 148.77631626 649442.68 N 70.51281654 W 148.77692635 649363.98 N 70.51295099 W 148.77756243 649286.08 N 70.51308206 W 148.77819217 649206.84 N 70.51321257 W 148.77883288 649127.93 N 70.51334001 W 148.77947110 649048.55 N 70.51346956 W 148.78011305 648970.20 N 70.51359942 W 148.78074663 648891.80 N 70.51373174 W 148.78138037 648813.96 N 70.51386724 W 148.78200945 648736.99 N 70.51400720 W 148.78263109 648660.28 N 70.51415571 W 148.78325006 648613.73 N 70.51425138 W 148.78362543 648480.63 N 70.51453935 W 148.7846 648396.68 N 70.51473044 W 148.78537342 648327.96 N 70.51489313 W 148.78592628 648261.08 N 70.51505722 W 148.78646390 648193.71 N 70.51522919 W 148.78700514 648128.27 N 70.51540224 W 148.78753051 648065.93 N 70.51557017 W 148.78803077 647999.04 N 70.51574834 W 148.78856770 647928.64 N 70.51592727 W 148.78913336 647866.98 N 70.51607670 W 148.78962923 647788.71 N 70.51626007 W 148.79025899 647717.14 N 70.51642231 W 148.79083530 SurveyEditor Ver SP 2.1 Bld( doc40x_100) NS33\NS33\NS33P61\NS33PB1 Generated 5/30/2007 11:41 AM Page 5 of 7 Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de n n n n ft ft tt de 00 ft ftUS itUS 1//L:i./1 /U.litt :iUy.:il /:iti1.U1 /4;i/.(i1 15U/1.131 1bUyi./1 1SU/;i.5;i y145.L:i -11ytS1.:i1 U./1 (iU4UUL(i.11 fi4/(i4b.bU N /U.bl(Sbt3Ut3/ W 14tS./y141"L:i1 17819.18 70.19 309.15 7412.99 7469.59 15162.75 15183.67 15163.44 9202.13 -12052.00 0.54 6040081.59 647574.62 N 70.51673599 W 148.79198338 17917.63 70.34 308.78 7446.24 7502.84 15255.40 15276.33 15256.07 9260.40 -12124.05 0.39 6040138.30 647501.33 N 70.51689486 W 148.79257387 18013.17 70.79 309.00 7478.03 7534.63 15345.48 15366.43 15346.13 9316.96 -12194.18 0.52 6040193.34 647430.01 N 70.51704908 W 148.79314858 18107.09 70.74 308.47 7508.97 7565.57 15434.15 15455.11 15434.79 9372.45 -12263.35 0.54 6040247.32 647359.67 N 70.51720035 W 148.79371548 18204.35 71.31 308.48 7540.59 7597.19 15526.12 15547.08 15526.74 9429.67 -12335.36 0.59 6040302.98 647286.46 N 70.51735635 W 148.79430559 18300.55 71.64 308.14 7571.16 7627.76 15617.33 15638.30 15617.95 9486.22 -12406.93 0.48 6040357.97 647213.69 N 70.51751050 W 148.79489218 18398.38 72.10 307.72 7601.60 7658.20 15710.31 15731.27 15710.92 9543.37 -12480.27 0.62 6040413.52 647139.15 N 70.51766629 W 148.79549319 18494.69 72.66 307.78 7630.75 7687.35 15802.10 15823.06 15802.71 9599.57 -12552.84 0.58 6040468.14 647065.38 N 70.51781948 W 148.79608801 18590.89 72.93 307.44 7659.21 7715.81 15893.99 15914.96 15894.60 9655.65 -12625.64 0.44 6040522.64 646991.40 N 70.51797235 W 148.79668464 18687.03 73.41 306.81 7687.04 7743.64 15986.00 16006.98 15986.62 9711.19 -12699.01 0.80 6040576.59 646916.86 N 70.51812373 W 148.79728595 18782.25 73.58 306.54 7714.10 7770.70 16077.28 16098.27 16077.91 9765.72 -12772.24 0.33 6040629.53 646842.49 N 70.51827236 W 148.7978 18877.41 73.67 306.48 7740.92 7797.52 16168.55 16189.57 16169.20 9820.04 -12845.62 0.11 6040682.25 646767.96 N 70.51842041 W 148.7984 18974.84 73.71 306.52 7768.29 7824.89 16262.03 16283.08 16262.70 9875.66 -12920.79 0.06 6040736.24 646691.62 N 70.51857200 W 148.79910353 19071.60 73.65 306.54 7795.47 7852.07 16354.87 16375.94 16355.55 9930.93 -12995.40 0.07 6040789.90 646615.84 N 70.51872265 W 148.79971509 19166.28 73.41 306.46 7822.32 7878.92 16445.63 16466.74 16446.33 9984.94 -13068.39 0.27 6040842.32 646541.71 N 70.51886984 W 148.80031328 19265.63 73.09 306.87 7850.95 7907.55 16540.74 16561.87 16541.46 10041.75 -13144.70 0.51 6040897.47 646464.20 N 70.51902467 W 148.80093874 19362.44 72.18 307.53 7879.84 7936.44 16633.13 16654.27 16633.85 10097.61 -13218.30 1.14 6040951.73 646389.43 N 70.51917692 W 148.80154197 19458.34 71.85 308.71 7909.46 7966.06 16724.35 16745.48 16725.06 10153.91 -13290.06 1.22 6041006.48 646316.48 N 70.51933039 W 148.80213018 19554.73 70.73 309.10 7940.38 7996.98 16815.63 16836.78 16816.32 10211.25 -13361.10 1.22 6041062.27 646244.22 N 70.51948667 W 148.80271257 19649.40 70.76 309.11 7971.59 8028.19 16904.98 16926.15 16905.66 10267.62 -13430.46 0.03 6041117.13 646173.68 N 70.51964033 W 148.80328110 19743.86 71.04 309.04 8002.50 8059.10 16994.22 17015.41 16994.88 10323.89 -13499.75 0.30 6041171.89 646103.20 N 70.51979369 W 148.80384916 19840.46 71.77 308.74 8033.31 8089.91 17085.77 17106.97 17086.40 10381.37 -13571.01 0.81 6041227.82 646030.72 N 70.51995037 W 148.80443336 19938.70 72.04 308.84 8063.82 8120.42 17179.14 17200.35 17179.76 10439.87 -13643.80 0.29 6041284.74 645956.70 N 70.52010982 W 148.80503005 20035.05 71.78 308.77 8093.74 8150.34 17270.71 17291.94 17271.32 10497.26 -13715.17 0.28 6041340.58 645884.12 N 70.52026626 W 148.80561517 20132.21 72.06 308.88 8123.89 8180.49 17363.06 17384.30 17363.65 10555.17 -13787.13 0.31 6041396.93 645810.94 N 70.52042409 W 148.80620507 20229.69 72.57 308.81 8153.50 8210.10 17455.92 17477.17 17456.50 10613.42 -13859.46 0.53 6041453.61 645737.37 N 70.52058285 W 148.80679809 20325.62 72.90 308.93 8181.97 8238.57 17547.52 17568.78 17548.08 10670.91 -13930.79 0.36 6041509.54 645664.84 N 70.52073954 W 148.80738282 20422.84 72.75 308.74 8210.68 8267.28 17640.39 17661.67 17640.94 10729.15 -14003.14 0.24 6041566.22 645591.25 N 70.52089829 W 148.80797601 5 20519.82 72.63 308.62 8239.54 8296.14 17732.97 17754.25 17733.50 10787.02 -14075.42 0.17 6041622.51 645517.75 N 70.52105600 W 148.808 20573.72 72.57 308.72 8255.66 8312.26 17784.40 17805.69 17784.92 10819.16 -14115.57 0.21 6041653.77 645476.92 N 70.52114358 W 148.80889783 20669.17 72.70 308.20 8284.14 8340.74 17875.49 17896.79 17876.01 10875.82 -14186.91 0.54 6041708.88 645404.39 N 70.52129800 W 148.80948268 20765.43 72.85 308.56 8312.65 8369.25 17967.43 17988.73 17967.94 10932.90 -14258.98 0.39 6041764.40 645331.11 N 70.52145357 W 148.81007361 20861.48 72.85 308.10 8340.97 8397.57 18059.21 18080.51 18059.71 10989.82 -14330.98 0.46 6041819.76 645257.91 N 70.52160869 W 148.81066389 20958.69 72.84 308.23 8369.65 8426.25 18152.09 18173.39 18152.59 11047.22 -14404.01 0.13 6041875.57 645183.67 N 70.52176511 W 148.81126266 21055.08 73.08 308.42 8397.89 8454.49 18244.25 18265.55 18244.74 11104.37 -14476.31 0.31 6041931.15 645110.16 N 70.52192085 W 148.81185545 21152.09 73.32 307.78 8425.93 8482.53 18337.12 18358.42 18337.60 11161.67 -14549.39 0.68 6041986.86 645035.87 N 70.52207700 W 148.81245466 21247.69 73.07 307.38 8453.57 8510.17 18428.63 18449.94 18429.12 11217.48 -14621.92 0.48 6042041.10 644962.17 N 70.52222909 W 148.81304932 21345.46 72.48 305.70 8482.52 8539.12 18521.99 18543.32 18522.49 11273.08 -14696.94 1.75 6042095.07 644885.97 N 70.52238057 W 148.81366442 21442.44 71.91 304.76 8512.18 8568.78 18614.22 18635.66 18614.75 11326.35 -14772.36 1.09 6042146.70 644809.43 N 70.52252568 W 148.81428275 21538.63 71.23 303.80 8542.59 8599.19 18705.29 18726.91 18705.86 11377.75 -14847.76 1.18 6042196.46 644732.94 N 70.52266568 W 148.81490089 SurveyEditor Ver SP 2.1 Bld( doc40x_100) NS33\NS33\NS33P61\NS33PB1 Generated 5/30/2007 11:41 AM Page 6 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft tt de 100 ft ftUS ftUS Lltiib.3/ /U.by :iUL.:iy tib/4.L:i titi:iU.tS:i 1tS/y(i.;iy ltStSltf.3:i lti/y/.Ul 114E/.Ei/ -14y14 .:S5 1.5;i (iU41"L44./"L 21731.19 69.77 302.73 8606.72 8663.32 18886.14 18908.47 18886.83 11476.18 -15000 .32 0.92 6042291.58 21828.59 69.10 304.36 8640.93 8697.53 18977.06 18999.67 18977.81 11526.57 -15076 .33 1.71 6042340.32 21924.27 68.82 305.80 8675.29 8731.89 19066.25 19088.97 19067.04 11577.89 -15149 .41 1.43 6042390.05 22021.46 68.89 306.65 8710.35 8766.95 19156.85 19179.61 19157.66 11631.45 -15222 .53 0.82 6042442.03 22117.40 69.16 307.80 8744.69 8801.29 19246.43 19269.19 19247.24 11685.65 -15293 .86 1.15 6042494.68 22213.97 69.42 308.92 8778.84 8835.44 19336.75 19359.52 19337.56 11741.70 -15364 .69 1.12 6042549.19 22309.73 69.74 309.77 8812.25 8868.85 19426.47 19449.27 19427.25 11798.60 -15434 .09 0.90 6042604.58 22405.91 70.07 310.72 8845.30 8901.90 19516.72 19539.59 19517.46 11856.95 -15503 .03 0.99 6042661.44 22502.26 70.38 311.69 8877.90 8934.50 19607.23 19630.26 19607.93 11916.68 -15571 .24 1.00 6042719.68 22597.56 70.65 313.18 8909.69 8966.29 19696.79 19720.10 19697.43 11977.30 -15637 .55 1.50 6042778.86 22694.07 70.29 313.57 8941.95 8998.55 19787.34 19811.06 19787.90 12039.77 -15703 .66 0.53 6042839.88 22792.15 68.94 314.79 8976.12 9032.72 19878.72 19902.99 19879.21 12103.84 -15769 .59 1.80 6042902.51 22888.19 67.65 315.00 9011.63 9068.23 19967.29 19992.22 19967.70 12166.81 -15832 .81 1.36 6042964.11 22984.42 66.28 314.34 9049.29 9105.89 20055.22 20080.78 20055.57 12229.07 -15895 .78 1.56 6043025.00 23080.29 65.22 313.28 9088.66 9145.26 20142.17 20168.19 20142.47 12289.58 -15958 .86 1.50 6043084.14 Last MWD+IFR+MS 23177.88 64.36 312.75 9130.23 9186.83 20230.11 20256.48 20230.37 12349.82 -16023 .41 1.01 6043142.96 TD (Projected) 23236.00 64.36 312.75 9155.38 9211.98 20282.32 20308.88 20282.55 12385.38 -16061 .89 0.00 6043177.69 Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata -gyro single shots -- Gyrodata gyro orientation surveys. Not to be run above 70 degrees inclination. ) MWD+IFR-MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Leaal Description: Northing (Y) [ftUS] Easting (X) [ftUS] Surface : 1368 FSL 650 FEL S11 T13N R13E UM 6031141.30 659820.74 BHL : 3176 FSL 862 FEL S32 T14N R13E UM 6043177.69 643497.53 (i44Fi55.:t1 N /U.5LLt3U1(i:i W 14tS.kflSSltf/1 644578.31 N 70.52293375 W 148.81615151 644501.25 N 70.52307098 W 148.81677459 644427.09 N 70.52321077 W 148.81737374 644352.84 N 70.52335671 W 148.81797331 644280.37 N 70.52350435 W 148.81855821 644208.35 N 70.52365710 W 148.81913905 644137.75 N 70.52381213 W 148.81970822 644067.58 N 70.52397116 W 148.82027367 643998.10 N 70.52413394 W 148.82083318 643930.51 N 70.52429916 W 148.82137710 643863.08 N 70.52446943 W 148.8219 643795.79 N 70.52464407 W 148.8224 643731.24 N 70.52481575 W 148.82297909 643666.95 N 70.52498547 W 148.82349581 643602.59 N 70.52515041 W 148.82401332 643536.76 N 70.52531458 W 148.82454297 643497.53 N 70.52541152 W 148.82485864 CJ SurveyEditor Ver SP 2.1 Bld( doc40x_100) NS33\NS33\NS33P61\NS33P61 Generated 5/30/2007 11:41 AM Page 7 of 7 by _ . _ _ _ _ _ _ _ _ Sehlumberger NS;~~rts1 purvey rcepvri Report Date: 23-Apr-07 Survey /DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 307.910° Field: Northstar Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure /Slot: Northstar PF /NS33 TVD Reference Datum: Rotary Table Well: NS33 TVD Reference Elevation: 56.60 ft relative to MSL Borehole: NS33PB2 Sea Bed /Ground Level Elevation: 16.10 ft relative to MSL UWVAPI#: 500292332571 Magnetic Declination: 24.078° Survey Name /Date: NS33PB2 /April 23, 2007 Total Field Strength: 57669.856 nT Tort /AHD / DDI / ERD ratio: 255.651 ° / 20443.53 ft / 7.113 / 2.163 Magnetic Dip: 81.070° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: April 02, 2007 Location LaULong: N 70.49162367, W 148.69334368 Magnetic Declination Model: BGGM 2006 Location Grid NIE Y/X: N 6031141.300 ftUS, E 659820.740 ftUS North Reference: True North Grid Convergence Angle: +1.23166855° Total Corr Mag North -> True North: +24.078° Grid Scale Factor: 0.99992902 Local Coordinates Referenced To: Well Head ~, r~ Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de tt n tt tt ft tt tt de 100 ft ttUS ftUS ~~ „ ~~ n nn n nn n nn n nn n nn Bn31141.30 659820.74 N 70.49162367 W 148.69334368 H I t GYD GC SS u.uu 50 00 u.uu 70 0 u.vv 18 25 -~o.vv -6 60 v.~~ 50.00 ....... 0.10 ~.~~ 0.31 ~•~~ 0.31 -•-- 0.29 -~-- 0.10 - - - 1.40 6031141.59 659820.83 N 70.49162447 W 148.69334290 . 100.00 . 0.62 . 18.15 . 43.40 100.00 0.30 0.88 0.88 0.84 0.28 0.16 6031142.14 659821.00 N 70.49162596 W 148.69334142 150 00 0.82 18.87 93.39 149.99 0.51 1.51 1.51 1.43 0.48 0.40 6031142.74 659821.18 N 70.49162759 W 148.69333979 . 208.00 1.14 324.05 151.38 207.98 1.19 2.43 2.31 2.29 0.27 1.63 6031143.60 659820.96 N 70.49162994 W 148.69334146 304.00 2.81 285.74 247.33 303.93 4.29 5.63 4.50 3.70 -2.55 2.13 6031144.95 659818.11 N 70.49163379 W 148.69336456 401.00 3.96 293.87 344.16 400.76 9.74 11.35 9.75 5.70 -7.91 1.28 6031146.83 659812.71 N 70.49163926 W 148.69340831 497.00 6.90 301.08 439.72 496.32 18.69 20.43 18.78 10.02 -15.88 3.14 6031150.98 659804.65 N 70.49165106 W 148.69347347 601.00 9.54 304.47 542.64 599.24 33.49 35.29 33.64 18.13 -28.34 2.58 6031158.81 659792.02 N 70.49167320 W 148.69357531 697.00 10.57 307.34 637.16 693.76 50.24 52.05 50.38 27.97 -41.90 1.19 6031168.36 659778.26 N 70.49170009 W 148.69368615 792.00 11.04 314.28 730.48 787.08 67.99 69.83 68.05 39.61 -55.34 1.46 6031179.71 659764.57 N 70.49173188 W 148.6937 ^? 889.00 13.58 313.64 825.25 881.85 88.56 90.51 88.56 53.95 -70.23 2.62 6031193.73 659749.37 N 70.49177107 W 148.693 Last Gyro 984.00 16.40 309.47 917.01 973.61 113.07 115.07 113.07 70.18 -88.66 3.18 6031209.55 659730.60 N 70.49181539 W 148.69406 4U First MWD+IFR+MS 1107.67 19.19 310.74 1034.75 1091.35 150.83 152.86 150.85 94.55 -117.54 2.28 6031233.29 659701.20 N 70.49188196 W 148.69430451 1200.87 20.23 307.72 1122.49 1179.09 182.24 184.29 182.27 114.40 -141.89 1.56 6031252.62 659676.43 N 70.49193620 W 148.69450359 1297.20 17.22 306.36 1213.71 1270.31 213.16 215.21 213.17 133.05 -166.56 3.16 6031270.73 659651.37 N 70.49198714 W 148.69470520 1392.14 17.76 308.97 1304.26 1360.86 241.68 243.74 241.70 150.49 -189.13 1.00 6031287.68 659628.43 N 70.49203478 W 148.69488974 1489.08 19.49 308.60 1396.12 1452.72 272.64 274.70 272.66 169.88 -21327 1.79 6031306.54 659603.89 N 70.49208775 W 148.69508704 1583.76 22.65 295.86 1484.51 1541.11 306.29 308.61 306.29 187.70 -242.04 5.86 6031323.74 659574.74 N 70.49213643 W 148.69532224 1679.62 25.69 300.32 1571.96 1628.56 344.95 347.84 345.02 206.24 -276.59 3.70 6031341.54 659539.80 N 70.49218709 W 148.69560473 1775.18 28.20 303.38 1657.14 1713.74 388.00 391.13 388.17 229.13 -313.34 3.00 6031363.62 659502.57 N 70.49224960 W 148.69590508 1871.48 29.67 303.16 1741.42 1798.02 434.43 437.72 434.71 254.68 -352.29 1.53 6031388.33 659463.08 N 70.49231941 W 148.69622353 1965.18 31.78 303.78 1821.96 1878.56 482.16 485.59 482.54 281.09 -39222 2.28 6031413.88 659422.60 N 70.49239155 W 148.69654994 SurveyEditor Ver SP 2.1 Bld( doc40x_100) NS33\NS33\NS33 drilling\NS33 Generated 5/30/2007 11:02 AM Page 1 of 7 1 Comments Measured Inclination Azimuth SuaSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longit~e Depth Section Departure ft de de n n n n tt n ft de 00 n ftUS ftUS 5y/tS .:i4 b`J.yb :fUti.lb 3bLt5.Lb ;Sbi54.tfb :iybtS.UU 3`Jb4 .Uy :iybU .bi L31t5. UtS -:SL11.4U U.tS:i bV:t:i:Stfy.b5 bSbbbU.4y N /U.4y/yb44b VV 14tf./1`JbU:fUb 6074 .58 70.12 309.43 3661.12 3717.72 4048.44 4055 .14 4050 .96 2374. 74 -3281.90 1.26 6033444.78 656488.79 N 70.49810917 W 148.72017977 6170 .41 70.28 311.10 3693.58 3750.18 4138.53 4145 .31 4140 .86 2433. 02 -3350.70 1.65 6033501.56 656418.76 N 70.49826829 W 148.72074254 6265 .74 70.31 310.90 3725.72 3782.32 4228.14 4235 .06 4230 .28 2491. 90 -3418.43 0.20 6033558.96 656349.79 N 70.49842905 W 148.72129662 6360 .36 70.61 311.11 3757.37 3813.97 4317.18 4324 .23 4319 .13 2550. 40 -3485.73 0.38 6033616.01 656281.26 N 70.49858880 W 148.72184710 6455 .96 70.83 311.59 3788.94 3845.54 4407.26 4414 .46 4409 .01 2610. 02 -3553.47 0.53 6033674.15 656212.26 N 70.49875158 W 148.72240126 6550 .05 70.85 311.66 3819.82 3876.42 4495.95 4503 .34 4497. 51 2669. 06 -3619.90 0.07 6033731.74 656144.57 N 70.49891277 W 148.72294477 6645 .97 70.89 312.05 3851.25 3907.85 4586.36 4593 .97 4587. 73 2729. 52 -3687.40 0.39 6033790.74 656075.79 N 70.49907787 W 148.72349698 6739 .57 70.49 312.16 3882.20 3938.80 4674.46 4682. 30 4675. 65 2788. 75 -3752.94 0.44 6033848.54 656009.00 N 70.49923958 W 148.72403314 6837 .35 71.23 312.74 3914.26 3970.86 4766.54 4774. 67 4767. 55 2851. 10 -3821.10 0.94 6033909.40 655939.52 N 70.49940982 W 148.72459077 6932 .26 71.74 310.90 3944.40 4001.00 4856.32 4864. 67 4857. 20 2911. 10 -3888.17 1.92 6033967.95 655871.19 N 70.49957365 W 148.72513947 7 7028 .96 72.17 309.22 3974.36 4030.96 4948.20 4956. 61 4948. 99 2970. 27 -3958.54 1.71 6034025.59 655799.57 N 70.49973519 W 148.725 7123 .95 71.44 307.13 4004.02 4060.62 5038.43 5046 .85 5039. 20 3026. 05 -4029.47 2.23 6034079.82 655727.46 N 70.49988745 W 148.72629549 7219 .63 71.07 306.21 4034.77 4091.37 5129.01 5137 .46 5129. 81 3080. 16 -4102.14 0.99 6034132.35 655653.64 N 70.50003516 W 148.72689002 7316 .13 70.65 305.64 4066.41 4123.01 5220.12 5228 .62 5220. 96 3133. 65 -4175.96 0.71 6034184.24 655578.69 N 70.50018118 W 148.72749398 7412 .82 71.19 306.62 4098.02 4154.62 5311.46 5320 .00 5312. 33 3187. 52 -4249.77 1.11 6034236.51 655503.76 N 70.50032825 W 148.72809777 7509 .44 70.64 307.21 4129.61 4186.21 5402.75 5411. 31 5403. 64 3242. 37 -4322.77 0.81 6034289.77 655429.59 N 70.50047796 W 148.72869505 7605 .93 71.88 308.73 4160.61 4217.21 5494.12 5502. 68 5494. 99 3298. 59 -4394.80 1.97 6034344.42 655356.38 N 70.50063142 W 148.72928436 7700 .90 71.02 308.49 4190.82 4247.42 5584.15 5592. 71 5584. 98 3354. 77 -4465.15 0.94 6034399.08 655284.84 N 70.50078479 W 148.72985999 7797 .40 72.19 308.31 4221.28 4277.88 5675.71 5684. 28 5676. 52 3411. 65 -4536.91 1.23 6034454.39 655211.88 N 70.50094005 W 148.73044714 7893 .09 72.17 305.76 4250.56 4307.16 5766.79 5775. 38 5767. 61 3466. 51 -4609.63 2.54 6034507.68 655138.01 N 70.50108981 W 148.73104209 7989 .93 71.63 304.37 4280.65 4337.25 5858.72 5867. 43 5859. 61 3519. 39 -4684.96 1.47 6034558.93 655061.56 N 70.50123415 W 148.73165849 8085 .80 71.31 304.51 4311.12 4367.72 5949.46 5958 .33 5950. 42 3570. 80 -4759.93 0.36 6034608.71 654985.51 N 70.50137446 W 148.73227185 8182 .54 70.94 306.30 4342.42 4399.02 6040.90 6049 .86 6041. 93 3623. 83 -4834.54 1.79 6034660.12 654909.78 N 70.50151920 W 148.73288230 8278 .96 70.89 307.94 4373.95 4430.55 6132.01 6140 .98 6133. 04 3678. 82 -4907.19 1.61 6034713.52 654835.97 N 70.50166928 W 148.73347679 8375 .87 71.04 309.37 4405.55 4462.15 6223.61 6232 .59 6224. 61 3736. 04 -4978.73 1.40 6034769.19 654763.22 N 70.50182548 W 148.73406217 8473 .24 7128 309.82 4437.00 4493.60 6315.72 6324 .75 6316. 66 3794. 77 -5049.74 0.50 6034826.38 654690.97 N 70.50198580 W 148.73464325 8570 .30 71.41 309.93 4468.04 4524.64 6407.63 6416 .71 6408. 50 3853. 73 -5120.32 0.17 6034883.80 654619.15 N 70.50214673 W 148.73522078 8666 .53 71.41 309.71 4498.72 4555.32 6498.79 6507 .92 6499. 60 3912. 14 -5190.37 0.22 6034940.69 654547.86 N 70.50230616 W 148.735 8763 .43 71.27 309.92 4529.72 4586.32 6590.54 6599. 72 6591. 29 3970. 92 -5260.89 0.25 6034997.94 654476.10 7 N 70.50246662 W 148.7363 8860 .74 71.55 310.73 4560.75 4617.35 6682.69 6691. 96 6683. 38 4030. 61 -5331.20 0.84 6035056.10 654404.53 N 70.50262954 W 148.73694659 8957 .60 71.95 310.33 4591.08 4647.68 6774.58 6783. 94 6775. 20 4090. 38 -5401.12 0.57 6035114.35 654333.35 N 70.50279270 W 148.73751878 9053 .76 72.16 310.11 4620.71 4677.31 6865.99 6875. 43 6866. 55 4149. 46 -5470.97 0.31 6035171.90 654262.24 N 70.50295394 W 148.73809046 9151 .80 72.25 309.92 4650.67 4707.27 6959.28 6968. 77 6959. 79 4209. 48 -5542.47 0.21 6035230.37 654189.48 N 70.50311777 W 148.73867557 9245 .98 72.09 308.62 4679.51 4736.11 7048.91 7058 .43 7049. 39 4266. 23 -5611.87 1.32 6035285.61 654118.88 N 70.50327266 W 148.73924361 9342 .91 71.93 308.46 4709.44 4766.04 7141.09 7150 .62 7141. 55 4323. 67 -5683.98 0.23 6035341.49 654045.55 N 70.50342943 W 148.73983375 9438 .47 72.03 308.19 4739.01 4795.61 7231.96 7241 .49 7232. 41 4380. 02 -5755.27 029 6035396.29 653973.07 N 70.50358322 W 148.74041720 9535 .10 72.11 307.85 4768.75 4825.35 7323.90 7333 .43 7324. 34 4436. 65 -5827.70 0.34 6035451.34 653899.45 N 70.50373777 W 148.74100996 9631 .99 71.35 307.66 4799.13 4855.73 7415.90 7425 .44 7416. 34 4492. 98 -5900.44 0.81 6035506.09 653825.52 N 70.50389151 W 148.74160531 9727 .10 7129 308.51 4829.59 4886.19 7506.00 7515 .54 7506. 43 4548. 56 -5971.36 0.85 6035560.13 653753.43 N 70.50404318 W 148.74218572 9821 .98 71.96 308.44 4859.50 4916.10 7596.04 7605 .58 7596. 45 4604. 58 -6041.85 0.71 6035614.62 653681.76 N 70.50419607 W 148.74276268 SurveyEditor Ver SP 2.1 Bld( doc40x_100) NS33\NS33\NS33 drilling\NS33 Generated 5/30/2007 11:02 AM Page 3 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longit~9e Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS 9917 .63 72.20 308.05 4888.93 4945.53 7687.05 7696 .59 7687.45 4660. 92 -6113.33 0.46 6035669 .40 653609.09 N 70.50434981 W 148.74334769 10014 .11 72 .37 307.39 4918.29 4974,89 7778.95 7788 .49 7779. 35 4717. 14 -6186.03 0.68 6035724 .05 653535.21 N 70.50450325 W 148.74394270 10108 .88 72 .15 305.98 4947.17 5003.77 7869.19 7878 .76 7869. 61 4771. 07 -6258.41 1.44 6035776 .40 653461.69 N 70.50465040 W 148.74453513 10205 .59 72 .00 305.86 4976.93 5033.53 7961.15 7970. 77 7961. 60 4825. 05 -6332.93 0.19 6035828 .76 653386.03 N 70.50479770 W 148.74514504 10303 .39 71 .82 305.75 5007.30 5063.90 8054.06 8063. 74 8054. 53 4879. 44 -6408.32 0.21 6035881 .52 653309.49 N 70.50494610 W 148.74576214 10369 .58 71 .61 305.82 5028.07 5084.67 8116.86 8126. 59 8117. 36 4916. 19 -6459.31 0.33 6035917 .16 653257.73 N 70.50504638 W 148.74617943 10466 .92 71 .25 305.76 5059.06 5115.66 8209.07 8218. 86 8209. 60 4970. 15 -6534.15 0.37 6035969 .50 653181.75 N 70.50519362 W 148.74679206 10561 .56 70 .75 306.78 5089.88 5146.48 8298.51 8308. 34 8299. 07 5023. 08 -6606.30 1.15 6036020 .86 653108.49 N 70.50533806 W 148.74738258 10657. 88 70 .53 307.47 5121.81 5178.41 8389.38 8399. 21 8389. 94 5077. 93 -6678.75 0.71 6036074 .14 653034.87 N 70.50548771 W 148.74797565 10753. 55 70 .95 308.27 5153.37 5209.97 8479.69 8489. 53 8480. 25 5133. 37 -6750.05 0.90 6036128 .03 652962.41 N 70.50563900 W 148.74855925 10849. 33 71 .18 308.83 5184.45 5241.05 8570.28 8580. 13 8570. 82 5189. 83 -6820.90 0.60 6036182. 95 652890.37 N 70.50579306 W 148.7491 10943. 42 70 .49 309.50 5215.33 5271.93 8659.14 8669. 00 8659. 65 5245. 96 -6889.81 1.00 6036237. 58 652820.27 N 70.50594622 W 148.7497 11039. 36 70 .97 309.75 5247.00 5303.60 8749.66 8759. 56 8750. 14 5303. 72 -6959.56 0.56 6036293. 82 652749.30 N 70.50610383 W 148.75027440 11133. 65 71 .81 310.13 5277.09 5333.69 8838.96 8848. 92 8839. 41 5361. 09 -7028.08 0.97 6036349. 70 652679.57 N 70.50626038 W 148.75083529 11230. 99 72 .25 309.70 5307.12 5363.72 8931.50 8941. 52 8931. 90 5420. 50 -7099.09 0.62 6036407. 57 652607.30 N 70.50642250 W 148.75141669 11324. 52 71 .95 309.61 5335.86 5392.46 9020.46 9030. 52 9020. 84 5477. 30 -7167.62 0.33 6036462. 87 652537.58 N 70.50657748 W 148.75197768 11420. 47 71 .09 309.96 5366.28 5422.88 9111.41 9121. 52 9111. 76 5535. 53 -7237.55 0.96 6036519. 58 652466.42 N 70.50673638 W 148.75255021 11513. 95 71 .34 309.82 5396.38 5452.98 9199.86 9210. 02 9200. 18 5592. 28 -7305.45 0.30 6036574. 86 652397.31 N 70.50689125 W 148.75310615 11610. 41 71 .74 309.71 5426.92 5483.52 9291.31 9301. 52 9291. 60 5650. 81 -7375.78 0.43 6036631. 86 652325.74 N 70.50705094 W 148.75368197 11704. 45 71 .18 309.07 5456.83 5513.43 9380.44 9390. 68 9380. 71 5707. 39 -7444.69 0.88 6036686. 94 652255.64 N 70.50720533 W 148.75424612 11801. 85 71 .07 308.05 5488.34 5544.94 9472.59 9482. 84 9472. 85 5764. 84 -7516.75 1.00 6036742. 82 652182.37 N 70.50736207 W 148.75483614 11896. 42 70 .67 307.24 5519.33 5575.93 9561.94 9572. 18 9562. 20 5819. 41 -7587.50 0.91 6036795. 86 652110.47 N 70.50751095 W 148.75541534 11992. 21 70 .63 307.10 5551.07 5607.67 9652.31 9662. 56 9652. 58 5874. 01 -7659.52 0.14 6036848. 90 652037.30 N 70.50765992 W 148.75600497 12086. 53 69 .77 307.40 5583.02 5639.62 9741.05 9751. 31 9741. 32 5927. 73 -7730.16 0.96 6036901. 08 651965.53 N 70.50780646 W 148.75658332 12173. 76 69 .48 306.92 5613.39 5669.99 9822.81 9833. 08 9823. 09 5977. 12 -7795.32 0.61 6036949 .06 651899.32 N 70.50794122 W 148.75711688 12267 .63 71 .06 306.77 5645.07 5701.67 9911.15 9921. 44 9911. 44 6030. 10 -7866.03 1.69 6037000 .50 651827.49 N 70.50808576 W 148.75769580 12362 .38 72 .05 307.92 5675.05 5731.65 10001.03 10011. 32 10001. 32 6084. 63 -7937.49 1.55 6037053 .47 651754.89 N 70.50823450 W 148.75828083 12457. 77 72 .08 307.69 5704.43 5761.03 10091.78 10102. 07 10092. 07 6140. 26 -8009.19 0.23 6037107 .55 651682.01 N 70.50838627 W 148.75886795 12553. 83 72 .13 306.81 5733.95 5790.55 10183.19 10193. 48 10183. 48 6195. 59 -8081.95 0.87 6037161 .30 651608.08 N 70.50853721 W 148.759 12647. 84 72 .14 305.84 5762.79 5819.39 10272.63 10282. 96 10272. 94 6248. 59 -8154.04 0.98 6037212. 73 651534.87 4 N 70.50868179 W 148.7600 12743. 86 72 .71 304.84 5791.78 5848.38 10364.07 10374. 50 10364. 41 6301. 54 -8228.71 1.16 6037264. 06 651459.09 N 70.50882620 W 148.76066535 12837. 85 72 .16 304.78 5820.14 5876.74 10453.55 10464. 11 10453. 93 6352. 69 -8302,28 0.59 6037313. 61 651384.44 N 70.50896572 W 148.76126773 12934 .40 71 .93 304.48 5849.91 5906.51 10545.25 10555. 95 10545. 67 6404. 89 -8377,86 0.38 6037364. 17 651307.76 N 70.50910808 W 148.76188653 13028 .93 72 .49 304.47 5878.79 5935.39 10635.09 10645. 96 10635. 56 6455. 84 -8452.06 0.59 6037413 .51 651232.49 N 70.50924704 W 148.76249407 13125 .17 71 .67 304.58 5908.40 5965.00 10726.50 10737. 53 10727. 02 6507. 73 -8527.50 0.86 6037463 .77 651155.95 N 70.50938859 W 148.76311180 13221 .59 71 .81 305.14 5938.61 5995.21 10817.94 10829. 10 10818. 50 6560. 07 -8602.64 0.57 6037514 .48 651079.72 N 70.50953132 W 148.76372700 13318 .78 71 .64 305.57 5969.09 6025.69 10910.14 10921. 39 10910. 73 6613. 47 -8677.91 0.46 6037566 .24 651003.33 N 70.50967697 W 148.76434332 13414 .41 71 .65 306.02 5999.20 6055.80 11000.84 11012. 15 11001. 46 6666. 56 -8751.53 0.45 6037617 .73 650928.59 N 70.50982176 W 148.76494617 13510 .61 71 .97 307.04 6029.24 6085.84 11092.20 11103. 54 11092. 85 6720. 96 -8824.96 1.06 6037670 .54 650854.00 N 70.50997014 W 148.76554753 13609 .73 71 .61 307.56 6060.21 6116.81 11186.35 11197. 70 11187. 00 6778. 02 -8899.86 0.62 6037725 .97 650777.90 N 70.51012577 W 148.76616089 SurveyEditor Ver SP 2.1 Bld( doc40x_100) NS33\NS33\NS33 drilling\NS33 Generated 5/30/2007 11:02 AM Page 4 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Fasting Latitude Longitu'~e Depth Section Departure ft de de n ft ft ft n n n de 100 n nUS nUS 13/U4. ZZ /1 .813 :iUt3 .5b t3UyU .Ub 6141i .bb 11L/6.U1 11'Cif/.:ib 11'L/d. 6b 6t3J3.'LC -Cy/U.4b V.yy 6U3///y./U 6bU/Ud.14 N /U.bIUZ/t351 W 1413./C3b/JyUb 13802. 00 71 .97 308 .74 6120 .63 6177 .23 11368.87 11380.23 11369. 50 6891. 28 -9043.00 0.44 6037836.12 650632.38 N 70.51043472 W 148.76733312 13897. 38 71 .73 309 .60 6150 .34 6206 .94 11459.49 11470.86 11460. 08 6948. 53 -9113.26 0.89 6037891.84 650560.90 N 70.51059087 W 148.76790861 13999. 98 71 .58 309 .86 6182 .63 6239 .23 11556.82 11568.25 11557. 39 7010. 77 -9188.16 0.28 6037952.46 650484.69 N 70.51076067 W 148.76852204 14089. 86 71 .66 308 .99 6210 .97 6267 .57 11642.09 11653.54 11642. 62 7064. 94 -9254.04 0.92 6038005.19 650417.66 N 70.51090842 W 148.76906168 14186. 84 71. 48 308 .59 6241 .63 6298 .23 11734.08 11745.55 11734. 60 7122. 58 -9325.76 0.43 6038061.27 650344.73 N 70.51106564 W 148.76964904 14283. 28 71. 73 307 .75 6272 .06 6328 .66 11825.59 11837.06 11826. 10 7179. 13 -9397.70 0.87 6038116.26 650271.59 N 70.51121989 W 148.77023829 14380. 03 71. 51 307 .06 6302 .57 6359 .17 11917.40 11928.88 11917. 92 7234. 90 -9470.63 0.71 6038170.45 650197.48 N 70.51137200 W 148.77083563 14475. 72 71. 78 306 .54 6332 .71 6389 .31 12008.21 12019.70 12008. 73 7289. 31 -9543.36 0.59 6038223.27 650123.61 N 70.51152037 W 148.77143125 14572. 77 71. 67 306 .00 6363 .14 6419 .74 12100.32 12111.85 12100. 87 7343. 82 -9617.66 0.54 6038276.18 650048.16 N 70.51166904 W 148.77203977 14669. 46 71. 90 304 .86 6393 .36 6449 .96 12192.08 12203.70 12192. 66 7397. 07 -9692.49 1.14 6038327.79 649972.21 N 70.51181423 W 148.77265268 14766. 64 71. 94 305 .35 6423 .52 6480 .12 12284.35 12296.08 12284. 97 7450. 19 -9768.07 0.48 6038379.28 649895.51 N 70.51195909 W 148.7732 14861. 55 71. 42 305 .95 6453 .35 6509 .95 12374.38 12386.18 12375. 03 7502. 70 -9841.28 0.81 6038430.20 649821.19 N 70.51210228 W 148.7738 14958. 70 71. 31 306 .13 6484 .40 6541 .00 12466.39 12478.23 12467. 07 7556. 87 -9915.72 0.21 6038482.75 649745.61 N 70.51224998 W 148.77448100 15055. 87 71. 30 305 .50 6515 .54 6572 .14 12558.37 12570.28 12559. 08 7610. 73 -9990.36 0.61 6038534.99 649669.84 N 70.51239684 W 148.77509234 15151. 77 71. 19 304 .89 6546 .38 6602 .98 12649.07 12661.09 12649. 82 7663. 06 -10064.57 0.61 6038585.71 649594.53 N 70.51253955 W 148.77570014 15248. 40 71. 23 304 .48 6577 .50 6634 .10 12740.41 12752.57 12741. 21 7715. 12 -10139.79 0.40 6038636.14 649518.21 N 70.51268149 W 148.77631626 15342. 88 71. 25 302 .77 6607 .89 6664 .49 12829.61 12842.03 12830. 49 7764. 66 -10214.28 1.71 6038684.06 649442.68 N 70.51281654 W 148.77692635 15439. 97 71. 50 302 .07 6638 .90 6695 .50 12921.20 12934.03 12922. 17 7813. 98 -10291.94 0.73 6038731.70 649363.98 N 70.51295099 W 148.77756243 15535. 54 71. 71 301 .97 6669. 06 6725 .66 13011.40 13024.72 13012. 49 7862. 07 -10368.83 0.24 6038778.12 649286.08 N 70.51308206 W 148.77819217 15632. 25 71. 33 300 .97 6699 .71 6756 .31 13102.55 13116.44 13103. 76 7909. 95 -10447.06 1.06 6038824.30 649206.84 N 70.51321257 W 148.77883288 15728. 15 71. 42 300 .96 6730 .34 6786 .94 13192.76 13207.32 13194. 11 7956. 71 -10524.99 0.09 6038869.37 649127.93 N 70.51334001 W 148.77947110 15824. 87 71. 38 301 .51 6761 .19 6817 .79 13283.80 13298.99 13285. 31 8004. 24 -10603.37 0.54 6038915.21 649048.55 N 70.51346956 W 148.78011305 15920. 76 71. 31 301 .75 6791 .86 6848 .46 13374.11 13389.84 13375. 76 8051. 89 -10680.73 0.25 6038961.18 648970.20 N 70.51359942 W 148.78074663 16017. 14 71. 48 302 .46 6822 .61 6879 .21 13464.99 13481.18 13466. 77 8100. 44 -10758.10 0.72 6039008.05 648891.80 N 70.51373174 W 148.78138037 16113. 70 71. 21 303 .37 6853 .50 6910 .10 13556.12 13572.67 13558. 02 8150. 15 -10834.90 0.94 6039056.09 648813.96 N 70.51386724 W 148.78200945 16210. 44 71 .37 304 .79 6884 .53 6941 .13 13647.54 13664.29 13649. 53 8201. 49 -10910.79 1.40 6039105.79 648736.99 N 70.51400720 W 148.78263109 16308. 76 71 .31 306 .79 6915 .99 6972 .59 13740.63 13757.45 13742. 66 8255. 96 -10986.35 1.93 6039158.62 648660.28 N 70.51415571 W 148.78325006 16369. 67 71 .38 308 .10 6935 .48 6992 .08 13798.33 13815.15 13800. 37 8291. 05 -11032.16 2.04 6039192.71 648613.73 N 70.51425138 W 148.78362543 16547. 61 70 .48 309 .71 6993 .62 7050 .22 13966.47 13983.33 13968. 43 8396. 66 -11163.03 0.99 6039295.47 648480.63 N 70.51453935 W 148.7846 16662. 53 70 .19 311 .00 7032 .29 7088 .89 14074.59 14091..54. 14076. 46 8466. 73 -11245.50 1.09 6039363.75 648396.68 N 70.51473044 W 148.78537342 16758. 38 69 .77 311 .97 7065 .11 7121 .71 14164.47 14181.60 14166. 24 8526. 38 -11312.96 1.05 6039421.94 648327.96 N 70.51489313 W 148.78592628 16853. 22 69 .86 313 .08 7097 .83 7154 .43 14253.20 14270.62 14254. 84 8586. 55 -11378.56 1.10 6039480.68 648261.08 N 70.51505722 W 148.78646390 16950. 42 70. 04 314 27 7131. 16 7187.76 14344.04 14361.92 14345. 54 8649. 60 -11444.60 1.16 6039542.29 648193.71 N 70.51522919 W 148.78700514 17046. 27 70. 37 315 .14 7163 .62 7220 .22 14433.59 14452.11 14434. 93 8713. 05 -11508.70 0.92 6039604.34 648128.27 N 70.51540224 W 148.78753051 17138. 02 71. 40 315 .36 7193 .66 7250 .26 14519.57 14538.80 14520. 76 8774. 61 -11569.73 1.15 6039664.57 648065.93 N 70.51557017 W 148.78803077 17235. 62 71 .43 314 .48 7224 .77 7281 .37 14611.39 14631.31 14612. 43 8839. 93 -11635.24 0.86 6039728.47 647999.04 N 70.51574834 W 148.78856770 17336. 03 71. 58 312 .62 7256 .62 7313 .22 14706.15 14726.53 14707. 07 8905. 54 -11704.25 1.76 6039792.57 647928.64 N 70.51592727 W 148.78913336 17422. 08 71. 52 311 .71 7283 .86 7340 .46 14787.55 14808.16 14788. 40 8960. 33 -11764.75 1.01 6039846.04 647866.98 N 70.51607670 W 148.78962923 17529. 81 71. 31 310 .67 7318 .19 7374 .79 14889.49 14910.27 14890. 28 9027. 58 -11841.59 0.94 6039911.62 647788.71 N 70.51626007 W 148.79025899 17627.09 71.19 309.80 7349.46 7406.06 14981.53 15002.39 14982.28 9087.08 -11911.91 0.86 6039969.59 647717.14 N 70.51642231 W 148.79083530 SurveyEditor Ver SP 2.1 Bld( doc40x_100) NS33\N533\NS33 drilling\NS33 Generated 5/30/2007 11:02 AM Page 5 of 7 } Measured Vertical Along Hole '/ Comments Inclination Azimuth SulrSea ND ND Closure NS EW DLS Northing Easting Latitude Longitu de Depth Section Departure ft de de ft it ft it ft ft ft de 100 ft ftUS ftUS 1//"L:i./1 /U.52i :iUy.31 /J251.U'L /4:i/.(iL 15U/L.251 15Uy:i ./1 15U/:i.5:i y145.L;f -11yi5L,J"L U./1 t5V4UULti.Ll t54/b45.5V IV /U. 5t55rSUtf/ W 1415./y141LSL 17819.18 70.19 309.15 7412.99 7469.59 15162.75 15183 .67 15163 .44 9202.13 -12052.00 0.54 6040081.59 647574.62 N 70. 51673599 W 148.79198338 17917.63 70.34 308.78 7446.24 7502.84 15255.40 15276 .33 15256 .07 9260.40 -12124,05 0.39 6040138.30 647501.33 N 70. 51689486 W 148.79257387 18013.17 70.79 309.00 7478.03 7534.63 15345.48 15366 .43 15346 .13 9316.96 -12194.18 0.52 6040193.34 647430.01 N 70. 51704908 W 148.79314858 18107.09 70.74 308.47 7508.97 7565.57 15434.15 15455 .11 15434 .79 9372.45 -12263.35 0.54 6040247.32 647359.67 N 70. 51720035 W 148.79371548 18204.35 71.31 308.48 7540.59 7597.19 15526.12 15547 .08 15526 .74 9429.67 -12335.36 0.59 6040302.98 647286.46 N 70. 51735635 W 148.79430559 18300.55 71.64 308.14 7571.16 7627.76 15617.33 15638 .30 15617 .95 9486.22 -12406.93 0.48 6040357.97 647213.69 N 70. 51751050 W 148.79489218 18398.38 72.10 307.72 7601.60 7658.20 15710.31 15731 .27 15710 .92 9543.37 -12480.27 0.62 6040413.52 647139.15 N 70. 51766629 W 148.79549319 18494.69 72.66 307.78 7630.75 7687.35 15802.10 15823 .06 15802 .71 9599.57 -12552.84 0.58 6040468.14 647065.38 N 70. 51781948 W 148.79608801 18590.89 72.93 307.44 7659.21 7715.81 15893.99 15914 .96 15894 .60 9655.65 -12625.64 0.44 6040522.64 646991.40 N 70. 51797235 W 148.79668464 18687.03 73.41 306.81 7687.04 7743.64 15986.00 16006. 98 15986. 62 9711.19 -12699.01 0.80 6040576.59 646916.86 N 70. 51812373 W 148.79728595 18782.25 73.58 306.54 7714.10 7770.70 16077.28 16098. 27 16077. 91 9765.72 -12772.24 0.33 6040629.53 646842.49 N 70. 51827236 W 148.7978 18877.41 73.67 306.48 7740.92 7797.52 16168.55 16189. 57 16169. 20 9820.04 -12845.62 0.11 6040682.25 646767.96 N 70. 51842041 W 148.7984 18974.84 73.71 306.52 7768.29 7824.89 16262.03 16283. 08 16262. 70 9875.66 -12920.79 0.06 6040736.24 646691.62 N 70. 51857200 W 148.79910353 19071.60 73.65 306.54 7795.47 7852.07 16354.87 16375. 94 16355. 55 9930.93 -12995.40 0.07 6040789.90 646615.84 N 70. 51872265 W 148.79971509 19166.28 73.41 306.46 7822.32 7878.92 16445.63 16466. 74 16446. 33 9984.94 -13068.39 0.27 6040842.32 646541.71 N 70. 51886984 W 148.80031328 19265.63 73.09 306.87 7850.95 7907.55 16540.74 16561. 87 16541. 46 10041.75 -13144.70 0.51 6040897.47 646464.20 N 70. 51902467 W 148.80093874 19362.44 72.18 307.53 7879.84 7936.44 16633.13 16654. 27 16633. 85 10097.61 -13218.30 1.14 6040951.73 646389.43 N 70. 51917692 W 148.80154197 19458.34 71.85 308.71 7909.46 7966.06 16724.35 16745. 48 16725. 06 10153.91 -13290.06 1.22 6041006.48 646316.48 N 70. 51933039 W 148.80213018 19554.73 70.73 309.10 7940.38 7996.98 16815.63 16836. 78 16816. 32 10211.25 -13361.10 1.22 6041062.27 646244.22 N 70. 51948667 W 148.80271257 19649.40 70.76 309.11 7971.59 8028.19 16904.98 16926. 15 16905. 66 10267.62 -13430.46 0.03 6041117.13 646173.68 N 70. 51964033 W 148.80328110 19743.86 71.04 309.04 8002.50 8059.10 16994.22 17015. 41 16994. 88 10323.89 -13499.75 0.30 6041171.89 646103.20 N 70. 51979369 W 148.80384916 19840.46 71.77 308.74 8033.31 8089.91 17085.77 17106. 97 17086. 40 10381.37 -13571.01 0.81 6041227.82 646030.72 N 70. 51995037 W 148.80443336 19938.70 72.04 308.84 8063.82 8120.42 17179.14 17200. 35 17179. 76 10439.87 -13643.80 0.29 6041284.74 645956.70 N 70. 52010982 W 148.80503005 20035.05 71.78 308.77 8093.74 8150.34 17270.71 17291. 94 17271. 32 10497.26 -13715.17 0.28 6041340.58 645884.12 N 70. 52026626 W 148.80561517 20132.21 72.06 308.88 8123.89 8180.49 17363.06 17384. 30 17363. 65 10555.17 -13787.13 0.31 6041396.93 645810.94 N 70. 52042409 W 148.80620507 20229.69 72.57 308.81 8153.50 8210.10 17455.92 17477 .17 17456 .50 10613.42 -13859.46 0.53 6041453.61 645737.37 N 70. 52058285 W 148.80679809 20325.62 72.90 308.93 8181.97 8238.57 17547.52 17568 .78 17548 .08 10670.91 -13930.79 0.36 6041509.54 645664.84 N 70. 52073954 W 148.80738282 20422.84 72.75 308.74 8210.68 8267.28 17640.39 17661. 67 17640. 94 10729.15 -14003.14 0.24 6041566.22 645591.25 N 70. 52089829 W 148.80797601 20519.82 72.63 308.62 8239.54 8296.14 17732.97 17754. 25 17733. 50 10787.02 -14075.42 0.17 6041622.51 645517.75 N 70. 52105600 W 148.8085 20573.72 72.57 308.72 8255.66 8312.26 17784.40 17805. 69 17784. 92 10819.16 -14115.57 0.21 6041653.77 645476.92 N 70. 52114358 W 148.80889783 20669.17 72.70 308.20 8284.14 8340.74 17875.49 17896. 79 17876. 01 10875.82 -14186.91 0.54 6041708.88 645404.39 N 70. 52129800 W 148.80948268 20765.43 72.85 308.56 8312.65 8369.25 17967.43 17988. 73 17967. 94 10932.90 -14258.98 0.39 6041764.40 645331.11 N 70. 52145357 W 148.81007361 20861.48 72.85 308.10 8340.97 8397.57 18059.21 18080. 51 18059. 71 10989.82 -14330.98 0.46 6041819.76 645257.91 N 70. 52160869 W 148.81066389 20958.69 72.84 308.23 8369.65 8426.25 18152.09 18173. 39 18152. 59 11047.22 -14404.01 0.13 6041875.57 645183.67 N 70. 52176511 W 148.81126266 21055.08 73.08 308.42 8397.89 8454.49 18244.25 18265 .55 18244 .74 11104.37 -14476.31 0.31 6041931.15 645110.16 N 70. 52192085 W 148.81185545 21152.09 73.32 307.78 8425.93 8482.53 18337.12 18358 .42 18337 .60 11161.67 -14549.39 0.68 6041986.86 645035.87 N 70. 52207700 W 148.81245466 21247.69 73.07 307.38 8453.57 8510.17 18428.63 18449 .94 18429 .12 11217.48 -14621.92 0.48 6042041.10 644962.17 N 70. 52222909 W 148.81304932 21345.46 72.48 305.70 8482.52 8539.12 18521.99 18543 .32 18522 .49 11273.08 -14696.94 1.75 6042095.07 644885.97 N 70. 52238057 W 148.81366442 21442.44 71.91 304.76 8512.18 8568.78 18614.22 18635 .66 18614 .75 11326.35 -14772.36 1.09 6042146.70 644809.43 N 70. 52252568 W 148.81428275 21538.63 71.23 303.80 8542.59 8599.19 18705.29 18726 .91 18705 .86 11377.75 -14847.76 1.18 6042196.46 644732.94 N 70. 52266568 W 148.81490089 SurveyEditor Ver SP 2.1 Bld( doc40x_100) NS33\NS33\NS33 drilling\NS33 Generated 5/30/2007 11:02 AM Page 6 of 7 i Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 00 ft ftUS ftUS 21635.37 70.59 302.39 8574.23 13630.83 18796.39 18818.33 18797A1 11427.67 -14924.35 21731.19 69.77 302.73 8606.72 8663.32 18886.14 18908.47 18886.83 11476.18 -15000.32 Tie-In Survey 21828.59 69.10 304.36 8640.93 8697.53 18977.06 18999.67 18977.81 11526.57 -15076.33 MWD+IFR+MS 21924.89 68.05 306.47 8676.11 8732.71 19066.61 19089.31 19067.40 11578.51 -15149.38 22021.33 66.64 306.32 8713.26 8769.86 19155.58 19178.31 19156.38 11631.31 -15221.02 22117.75 66.31 307.89 8751.75 8808.35 19243.97 19266.71 19244.78 11684.64 -15291.53 22213.99 65.91 308.53 8790.72 8847.32 19331.96 19354.71 19332.77 11739.07 -15360.67 22310.02 65.15 310.08 8830.50 8887.10 19419.34 19442.11 19420.12 11794.43 -15428.30 22406.40 63.76 310.31 8872.06 8928.66 19506.23 19529.06 19506.97 11850.55 -15494. 72 22503.61 62.77 311.04 8915.79 8972.39 19592.94 19615.88 19593.65 11907.13 -15560. 56 22599.46 62.28 311.22 8960.02 9016.62 19677.85 19700.92 19678.51 11963.07 -15624. 62 22695.78 61.94 312.13 9005.07 9061.67 19762.79 19786.05 19763.41 12019.67 -15688. 20 22792.33 61.84 312.83 9050.56 9107.16 19847.68 19871.21 19848.24 12077.18 -15751. 01 22888.93 62.26 312.79 9095.84 9152.44 19932.70 19956.54 19933.21 12135.17 -15813. 61 22985.13 61.44 313.22 9141.23 9197.83 20017.19 20041.37 20017.64 12193.02 -15875. 64 23082.12 59.98 313.08 9188.67 9245.27 20101.42 20125.95 20101.82 12250.87 -15937. 35 23178.16 58.58 312.52 9237.73 9294.33 20183.68 20208.51 20184.04 12306.97 -15997. 93 23273.61 57.18 312.36 9288.48 9345.08 20264.27 20289.35 20264.58 12361.52 -16057. 59 1.53 6042244./1 0.92 6042291.58 1.71 6042340.32 2.31 6042390.67 1.47 6042441.92 1.53 6042493.72 0.74 6042546.65 1.67 6042600.54 1.46 6042655.21 1.22 6042710.36 0.54 6042764.90 0.91 6042820.12 0.65 6042876.27 (144855.31 N /U.5L18U783 W 148.815518/1 644578.31 N 70.52293375 W 148.81615151 644501.25 N 70.52307098 W 148.81677458 644427.10 N 70.52321247 W 148.81737357 644354.35 N 70.52335633 W 148.81796096 644282.72 N 70.52350162 W 148.81853909 644212.43 N 70.52364992 W 148.81910609 644143.63 N 70.52380078 W 148.81966074 644076.02 N 70.52395371 W 148.82020553 644008.98 N 70.52410791 W 148.82074559 643943.74 N 70.52426035 W 148.82127100 643878.96 N 70.52441462 W 148.8217 643814.94 N 70.52457137 W 148.8223 643751.11 N 70.52472942 W 148.82282140 643687.85 N 70.52488711 W 148.82333029 643624.92 N 70.52504479 W 148.82383659 643563.15 N 70.52519768 W 148.82433356 643502.34 N 70.52534636 W 148.82482299 643441.37 N 70.52549262 W 148.82531390 643420.98 N 70.52554062 W 148.82547813 643384.91 N 70.52562535 W 148.82576866 0.44 6042932.89 0.94 6042989.39 1.51 6043045.90 1.54 6043100.68 1.47 6043153.93 23370.08 55.69 311.41 9341.82 9398.42 20344.45 20369.73 20344.74 12415.19 -16117.42 1.75 6043206.30 Last MWD+IFR+MS 23402.49 55.03 311.28 9360.24 9416.84 20371.07 20396.40 20371.35 12432.81 -16137.44 2.06 6043223.48 TD (Projected) 23460.00 55.03 311.28 9393.20 9449.80 20418.12 20443.53 20418.38 12463.90 -16172.86 0.00 6043253.80 Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata -gyro single shots -- Gyrodata gyro orientation surveys. Not to be run above 70 degrees inclination. ) MWD+IFR-MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Legal Description: Northing (Y) [ftUS] Easting (X) [ftUS] Surface : 1368 FSL 650 FEL S11 T13N R13E UM 6031141.30 659820.74 BHL : 3255 FSL 973 FEL S32 T14N R13E UM 6043253.80 643384.91 SurveyEditor Ver SP 2.1 Bld( doc40x_100) NS33\NS33\NS33 drilling\NS33 Generated 5/30/2007 11:02 AM Page 7 of 7 • SARAH PAUN, GOVERNOR ~~ OW ~ ~ 333 W. 7th AVENUE, SUITE 100 C011TSERQATI011T C01~II+IISSIOI~T ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Northstar Unit, Northstar Oil Pool, NS33 Sundry Number: 307-145 Dear Mr. Archey: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Dan T. Seamount Commissioner DATED this day of May, 2007 Encl. ~~ ~ '~~ ~,(a'3' ~-3 -a 7 ~~ . STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY 20 AAC 25.280 1. Type of Request: ^ Abandon ®Suspend ^ Operation Shutdown ^ Perforate ^ Time ExtensiorAnChOC8g8 ^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ®Development ^ Exploratory 206-138 ' 3. Address: ^ Stratigraphic ^ Service 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-23325-00-00' 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: NS33 Spacing Exception Required? ^ Yes ®No 9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s): ADL 312798 ~ 56' - Northstar Unit ` 12. PRESENT WELL CONDITION SUM MARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 23460 9447 23460 9447 None None sin L n h Siz M TVD Burst Colla se r ur I Conductor 190' 24" 190' 190' Surface 4426' 16" 4472' 3195' 4330 1910 Int rme is e 1 4 1' 11-3/4" 1 4 1' 7032' 92 4410 Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): None None None None N/A Packers and SSSV Type: Packers and SSSV MD (ft): 13. Attachments: 14. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Exploratory ®Development ^ Service ^ Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencin O erations: April 24, 2007 ^ Oil ^ Gas ®Plugged ^ Abandoned 17. Verbal Approval: Date: 4/24/2007 ^ WAG ^ GINJ ^ WINJ ^ WDSPL Commission Representative: Cathy Foerster 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Skip Coyner, 564-4395 Printed Name Pat Archey Title Senior Drilling Engineer Prepared By Name/Number: Signature ~~ ~~ Phone 564-5803 Date y 25 U Sondra Stewman, 564-4750 Commission Use Onl Sundry Number: .. Conditions of approval: Notify Commission so that a representative may witness ^ Plug Integrity ^ BOP Test ^ Mechanical Integrity Test ^ Location Clearance Other: Subsequent Form Required: l.-, ® ~- ~CR ~-"~~~ pQ.(~ ~~ t~~- v~ , ~b~ APPROVED BY A roved B COMMISSIONER THE COMMISSION Date ~ 3 Form 10-403 Revi'sedr06/2006 oRir,~Na~ Submit In Duplicate S ~~, ~~~~J ~~~~ APPROVAL ~~ DECEIVED APK 2 6 2007 n n NS33 Drilling Program NS33 Plug Back & Suspend: r~ LJ Intermediate casing was set and cemented in NS33: 11-3/4", 60#, S-95 at 16491' MD / 7032' TVD. Subsequently, the second intermediate hole was drilled and opened to 12- 1/4" down to 23460' MD / 9447' TVD. Hole problems in the form of boulders or ruble at 16940'-16967'have made running the 9-5/8" drilling liner impossible. Also of note is the fact that the well was inadvertently sidetracked at ±21828' MD / 8695' TVD. The P & A plan is to set an EZSV 100' above the 11-3/4" shoe and bullhead enough cement volume to fill the open hole down to 17500' including 100% excess. We will also dump 100' of cement on top of the EZSV. Use the cement on location as follows: • Lead: 219 bbl (569 sx) of LiteCrete • Tail: 100 bbl (484 sx) of class G Rig Operations: 1. ^ RIH with an 11-3/4" EZSV on 5-7/8" DP. Break circulation every 4000 ft for at least 15 minutes at the maximum flow rate allowed by the Halliburton tool hand. 2. ^ Set the EZSV at +/- 16391' (+/- 100' above the shoe) and test to 2500 psi. 3. ^ Establish injection rate at 6 - 10 BPM. 4. ^ Un-sting from the EZSV and CBU while RU Schlumberger. 5. ^ PJSM. Pump 30 bbls of 11.5 ppg spacer. Test lines to 3000 psi. 6. ^ Close the annular preventer with +/- 500 psi closing pressure and line up to take returns through a wide open choke. This will keep the cement from failing to fast. 7. ^ Mix and pump 219 bbl of lead followed by 100 bbl of tail cement. 8. ^ Sting into the EZSV. Close the choke. Increase the closing pressure on the annular preventer. Monitor the IA for pressure increases during the displacement. 9. ^ Displace the cement to +/- 15900' with 20 bbl of 11.5 ppg spacer followed by +/- 366 bbl of MOBM. Check for pressure in the IA and bleed it off through the choke. 10. ^ Open the annular preventer. Un-sting from the EZSV and dump the remaining 11.3 bbl of cement on top of the EZSV. 11. ^ Rack back 2 to 3 stands of 5-7/8" DP. CBU x 3 at maximum flow rate & RPM. 12. ^ Test the EZSV & cement to 2500 psi. LDDP. 13. ^ RU E-Line. Run a USIT/CCL through the build section to document any casing wear. It is desired to run the log to +/- 5500' to cover all dog legs > 3°/100'. If the logging tools won't go to that depth, call the ODE. RD E-line. 14. ^RIH with +/- 2000' of 4-1/2", L80, NSCT tubing (kill string). Run an XN nipple and WLEG on bottom. Hang the kill string using a tubing hanger. RILDS. Set a BPV. NS33 Drilling Program 15. ^ Set & Test a BPV. Drain the BOP stack. ND BOPE. 16. ^ NU dry hole tree. Test the tree, tubing hanger and casing to 2500 psi. 17. ^ Release the rig. • See attached wellbore schematic • Sundry Approval is pending - we will proceed once verbal approval is given r~ ~p <3~ACas~a ~ Z.StaY BP EXPLORATION ~ ! ~Y~I ~ N S-33 E RD ~'~~ Field: Northstar 12-1/4" Open Hole ENG: S. Coyner Date: April 24, 2007 Proposed P 8c A RIG: Nabors 33E Directional Plan: P10b RKB: 56 tt DIR/LWD Mud DEPTH HOLE CASING CEMENT GENERAL MWD Weight FORM SIZE MD TVD SPECS INFO INFO 24" NONE NONE Drive None 190' 190' N/A Pipe MWD/GR 8.6 Kick Off Point 200' 200' Surface Csa 16", 84# HCN-80, BTC IFR/Cas ~;.~~ 65° 9.3 16" Casing 4,471' 3,195' '~~ MWD/GR PWD Top of SV-2 7,066' 4,006' Inter. Casing LSS, S-95 Hydril 563 IFR/Cas MOBM 11.1 Cemented with 11.5# LiteCrete 876 bbl / 1801 sx 2.71 cf/ sx Testa Csg to 15.8# Class G 2500 psi 114 bbl / 538 sx 1.19 cf/ sx Top of Cement 16,291' 6,967' EZSV 16,391' 6,999' 140° 9.5 11-314" Casing 16,491' 7,032' 14-314" Colville MWD/GR/RES FIT to 12.5 ppg 319 bbl PWD MOBM TlRuble Zone 16,940' 7,184' ~ Cement ~ 100% Excess 11.1 Bottom of CMT 17,500' 7,365' ` 70.0° 12-114" Hole ~ Cap=.1458 bbl/ft MOBM ~ P & A Cement 11.1 ~ 219 bbls, 567 sx IFR/Cas ~ ~ 12.5 ppg LiteCrete 2.17 cf/sx 100 bbls, 484 sx Top of HRZ 21,612' 8,624' ~ 70.6° ~ 15.8 ppg Class G Sidetracked 21,828' 8,695' ~ ~ 1.16 cf/sx Bottom of HRZ 21,955' 8,740' ~ 68.0° Top of Kuparuk D 22,310' 8,885' ~ ~ Top of Kuparuk C 22,810' 9,113' ~ 61.8° Base of Kuparuk C 23,000' 9,202' Top of Kuparuk A 23,080' 9,240' 210° Open Hole TD 23,460' 9,447' 54.2° 10-518" Bit 12-1/4" Rh ino Reamer BlKuparuk A [10/04!04] P A Well Schematic.xls Re: Northstar /NS33 /Plug Back &Suspend• Subject: Re: Northstar /NS33 /Plug Back & Suspend From: Thomas Maunder <tom_maunder@admin.state.ak.us> Date: Tue, 24 :1pr ?i)07 16:34:1 ~ -USiiO 'To: "Coyner. Skip (N.nT("HIQ)" .-Skip.Coy7~~rru%:bp.com.. CC: "~'~rchcv. I'at" ~~Patri~k..~~rchc~~~r?13P.com=,, F~OGC(' North Slope Ofiicc -ao«,cc~~ru~ihocba~~~a~:admin.sta~c.ak.us- Skip and Pat, We have examined the log information sent in support of your plan to suspend operations on this well. We concur with the assessment of no hydrocarbon in the Kuparuk. We also concur that there are no over-pressured formations or fresh water. Commissioner Foerster advises that you have verbal approval to proceed. I will look forward to receiving the sundry for this activity. Please contact the Inspector with an opportunity to witness the pressure test of the wellbore, step 12. Call or message with any questions. Tom Maunder, PE AOGCC Coyner, Skip (NATCHIQ) wrote, On 4/24/2007 2:32 PM: Mr. Maunder, Attached is our plug back and suspend procedure and wellbore diagram. Sondra Stewman is preparing a request for sundry approval using the same documents. Suspend the well: 20 AAC 25.110 a, 1, B and C In that the only "reservior rock" in the open hole, Kuparuk, is not hydrocarbon bearing, we propose to plug the well back using a single cement plug and EZSV. That cement plug will be pumped through an EZSV set 100' above the intermediate casing shoe. Cement wil be bullheaded to 500' below the shoe (into the ruble zone) with 100% excess. The final top of cement will be 100' above the EZSV at +/- 16291' MD. Both the open hole and the cased hole will be left with 11.1 ppg MOBM. The Kuparuk is a 9.4 ppg zone in this area. There are no fresh water zones present. Plug Back: 20 AAC 25.112 b, 2 Verbal approval to plug back and suspend the well is hereby requested. If you have any questions or comments, please advise. Thank you. Skip Coyner 907-564-4395 BPXA 907-240-8412 cell «Plug Back &Suspend Prog.doc» «P & A Well Schematic.xls» 1 of 1 4/24/2007 4:39 PM NS33 Subject: NS33 From: Art Saltmarsh <art_saltmarsh@admin.state.ak.us> Date: Tue, 24 Apr 2007 13:47:53 -0800 To: Thomas E; ~1~1aur~~cr <~lom maundcri~uad~T~in.state.ak.us= Tom, I've looked through the data for the NS33 well. I agree with the assessment that the Kuparak C & A in the original well and the sidetrack are both wet based on the NS08 (Gas) and the NS09 (Water wet). I think the key is in the mudlog gas readings. The NS33 displayed very similar total gas to the N509 well. The NS08 well displayed total gas readings at least a magnitude greater (max 367 units vs. 5915 units) than either the NSOB or the NS33. The resistivities are also lower and more in line with water wet zones. As long as they are going to put a plug somewhere uphole, I don't think we'll have a problem. Is there some form of monitoring we can get them to do at the surface?? Just a thought. Art 1 of 1 4/24/2007 2:38 PM NS33 Drilling Program ~ ~m AFE Number: 1 2 3 4 ORTHSTAR WELL S33 Plug Back and Suspend Operations NSD831387 FOUR OBJECTIVES: Prepared by: Skip Coyner NO ACCIDENTS NO SPILLS OR ENVIRONMENTAL VIOLATIONS NO POLICY OR REGULATORY VIOLATIONS MEET OR EXCEED AOGCC REGULATIONS No portion of this work is so urgent that the time cannot be taken to do it without injuring yourself or others. Approved By: Ops. Drilling Engr Distribution; M. Miller - MB 4-1 P. Archey - MB 4-1 ' D. Kara - MB-1 D Johnson - MB 4-1 S Coyner - MB 4-1 P. Hanson - MB 4-1 J. Garing - MB 4-1 Wellfile Nabors 33E Schlumberger E-Line Schlumberger Cementing Baker MI Nabors Date Engineering TL Date ACT Drilling Manager Date 1 Copy 1 Copy 1 Copy 1 Copy 1 Copy 1 Copy 1 Copy Original 8 Copies 1 Copy 1 Copy 1 Copy 1 Copy 1 Copy Northstar Subsurface TL Date NS33 Drillin Pro ram • ~ g NS33 Plua Back & Susaend: Intermediate casing was set and cemented in NS33: 11-3/4", 60#, S-95 at 16491' MD / 7032' TVD. Subsequently, the second intermediate hole was drilled and opened to 12- 1/4" down to 23460' MD / 9447' TVD. Hole problems in the form of boulders or ruble at 16940'-16967'have made running the 9-5/8" drilling liner impossible. Also of note is the fact that the well was inadvertently sidetracked at ±21828' MD / 8695' TVD. The P & A plan is to set an EZSV 100' above the 11-3/4" shoe and bullhead enough cement volume to fill the open hole down to 17500' including 100% excess. We will also dump 100' of cement on top of the EZSV. Use the cement on location as follows: • Lead: 219 bbl (569 sx) of LiteCrete • Tail: 100 bbl (484 sx) of class G Rig Operations: 1. ^ RIH with an 11-3/4" EZSV on 5-7/8" DP. Break circulation every 4000 ft for at least 15 minutes at the maximum flow rate allowed by the Halliburton tool hand. 2. ^ Set the EZSV at +/- 16391' (+/- 100' above the shoe) and test to 2500 psi. 3. ^ Establish injection rate at 6 - 10 BPM. 4. ^ Un-sting from the EZSV and CBU while RU Schlumberger. 5. ^ PJSM. Pump 30 bbls of 11.5 ppg spacer. Test lines to 3000 psi. 6. ^ Close the annular preventer with +/- 500 psi closing pressure and line up to take returns through a wide open choke. This will keep the cement from falling to fast. 7. ^ Mix and pump 219 bbl of lead followed by 100 bbl of tail cement. 8. ^ Sting into the EZSV. Close the choke. Increase the closing pressure on the annular preventer. Monitor the IA for pressure increases during the displacement. 9. ^ Displace the cement to +/- 15900' with 20 bbl of 11.5 ppg spacer followed by +/- 366 bbl of MOBM. Check for pressure in the IA and bleed it off through the choke. 10. ^ Open the annular preventer. Un-sting from the EZSV and dump the remaining 11.3 bbl of cement on top of the EZSV. 11. ^ Rack back 2 to 3 stands of 5-7/8" DP. CBU x 3 at maximum flow rate & RPM. 12. ^ Test the EZSV & cement to 2500 psi. LDDP. 13. ^ RU 'E-Line. Run a USIT/CCL through the build section to document any casing wear. It is desired to run the log to +/- 5500' to cover all dog legs > 3°/100'. If the logging tools won't go to that depth, call the ODE. RD E-line. 14. ^RIH with +/- 2000' of 4-1/2", L80, NSCT tubing (kill string). Run an XN nipple and WLEG on bottom. Hang the kill string using a tubing hanger. RILDS. Set a BPV. NS33 Drillin Pro ram • ~ g 15. ^ Set & Test a BPV. Drain the BOP stack. ND BOPE. 16. ^ NU dry hole tree. Test the tree, tubing hanger and casing to 2500 psi. 17. ^ Release the rig. • See attached wellbore schematic • Sundry Approval is pending - we will proceed once verbal approval is given ~~ ~ ~.1 ~ ~~ r~ LG~~ ~' ~Z _ ~~. ~ ~ ~ ~ ~ ;' ~ BP EXPLORATION ~ ~ r,~` P _~~~ Field: Northstar 92-9/4'~ Open Hole ENG: S. Coyner Date: April 24, 2007 Proposed P & A RIG: Nabors 33E Directional Plan: P10b RKB: 56 ft DIRlLWD Mud DEPTH HOLE CASING CEMENT GENERAL FORM MWD Weight MD TVD SIZE SPECS INFO INFO 24" NONE NONE Drive None 190' 190' N/A Pipe MWDlGR 8.6 Kick Off Point 200' 200' Surface Csa 16", 84# HCN-80, BTC IFR/Cas t~~ .; ,. 65° 9 3 16" Casing 4 4 %~' 3.195' " MWD/GR PWD Top of SV-2 7,066' 4,006' Inter. Casing 11-314", 60# LSS, S-95 Hydrit 563 IFR/Cas MOBM 11.1 Cemented with 11.5# LiteCrete 876 bbl / 1801 sx 2.71 cf/ sx Testa Csg to ~ 15.8# Class G 2500 psi s .'; 114 bbl / 538 sx r "~ `: 1.19 cf/ sx Top of Cement 16,291' s - 6,967 ,., ,.; EZSV 16,391' 6,999' [;__ ~ 1d0° 9.5 11-314" Casi~~g iS a31' 7,032' ~ 14-314" Colville MWDlGR/RES FIT to 12.5 ppg 319 bbl , PWD MOBM T/Ruble Zone 16,940' 7 184' Cettlet~t ~ 100% Excess 11.1 Bottom of CMT 17,500' 7,365' ' 70.0° 12-1/4" Hole ' I Cap=.1458 bbl/ft i MOBM ~ P 8 A Cement 11.1 ~ 219 bbls, 567 sx IFR/Cas ( ~ 12.5 ppg LiteCrete 2.17 cf/sx 100 bbls, 484 sx Top ofHRZ . 21,612' 8,624' ~ 70.6° ~ 15.8 ppg Class G Sidetracked 21,828' 8,695' ~ ~ 1.16 cf/sx Bottom of HRZ 21,955' 8,740' ~ 68.0° Top of Kuparuk D 22,310' 8,885' Top of Kuparuk C 22,810' 9,113' ~ 61.8° Base of Kuparuk C 23,000' 9,202' Top of Kuparuk A 23,080' 9,240' 210° Open Hole TD <r0' 9 41„ ~ 54.2° ~ 10-5/&" Bit 12-t14" Rhi no Reamer B/Kuparuk A [10/04/04) P & A Well Schematic.xls Page 1 of 1 Maunder, Thomas E (DOA) From: Thomas Maunder [tom_maunder@admin.state.ak.us] Sent: Tuesday, April 24, 2007 4:34 PM ,~ ~ (D ~- ~~ To: Coyner, Skip (NATCHIQ) Cc: Archey, Pat; AOGCC North Slope Office Subject: Re: Northstar ! NS33 /Plug Back & Suspend Skip and Pat, We have examined the log information sent in support of your plan to suspend operations on this well. We concur with the assessment of no hydrocarbon in the Kuparuk. We also concur that there are no over-pressured formations or fresh water. Commissioner Foerster advises that you have verbal approval to proceed. I will look forward to receiving the sundry for this activity. Please contact the Inspector with an opportunity to witness the pressure test of the wellbore, step 12. Call or message with any questions. Tom Maunder, PE AOGCC Coyner, Skip (NATCHIQ) wrote, On 4/24/2007 2:32 PM: Mr. Maunder, Attached is our plug back and suspend procedure and wellbore diagram. Sondra Stewman is preparing a request for sundry approval using the same documents. Suspend the well: 20 AAC 25.110 a, 1, 6 and C In that the only "reservior rock" in the open hole, Kuparuk, is not hydrocarbon bearing, we propose to plug the well back using a single cement plug and EZSV. That cement plug will be pumped through an EZSV set 100' above the intermediate casing shoe. Cement wil be bullheaded to 500' below the shoe (into the ruble zone) with 100% excess. The final top of cement will be 100` above the EZSV at +/-16291' MD. Both the open hole and the cased hole wilt be left. with 11.1 ppg MOBM. The Kuparuk is a 9.4 ppg zone in this area. There are no fresh water zones present. Plug Back: 20 AAC 25.112 b, 2 Verbal approval to plug back and suspend the well is hereby requested. If you have any questions or comments, please advise. Thank you. Skip Coyner 907-564-4395 BPXA 907-240-8412 cell «Plug Back & Suspend Prog.doc» «p 8~ A Well Schematic.xls» 7111 /2007 • Maunder, Thomas E {DOA) From: Art Sattmarsh [art saltmarsh@admin.state.ak.usj Sent: Tuesday, Aprit 24, 2007 T :48 PM To: Thomas E Maunder Subject: NS33 a~~ `\2 Tom, I've looked through the data for the NS33 well. I agree with the assessment that the Kuparak C & A in the original well and the sidetrack are both wet based on the NS08 (Gas) and the NS09 (Water wet?- I think the key is in the mudlog gas readings. The NS33 displayed very similar total gas to the NS09 well. The NS08 well displayed total gas readings at least a magnitude greater (max 367 units vs. 5915 units) than either the NS08 or the NS33. The resistivities are also lower and more in line with water wet zones. As long as they are going to put a plug somewhere uphole, I don't think we'll have a problem. Is there some form of monitoring we can get them to do at the surface?? Just a thought. Art 1 • . Page 1 of 3 Maunder, Thomas E (DOA) From: Coyner, Skip (NATCHIQ) [Skip.Coynerc~bp.com] Sent: Monday, April 02, 2007 11:49 AM To: Thomas Maunder a ~ (O ®~~ Subject: RE: Northstar /NS33 The sidetrack occured when we were supposed to be washing to bottom but the rig guys did so at full operating parameters including 20,000# WOB. The thing is that at full pump rate the Rhino Reamer opens and thus serves as a 12-114" OD fulcrum. The Rhino Reamer is 100 ft above the 10-5/8" bit so we had the best pendulum "drop" assembly you could ever have. Apparently, they "caught an edge" and the rest is history. We did this to ourselves. Skp Coyner 907-564-4395 BPXA 907-240-8412 cell From: Thomas Maunder [mailto:tom_maunder@admin.state.ak.us] Sent: Monday, April 02, 2007 11:26 AM To: Coyner, Skip (NATCHIQ) Cc: Archey, Pat Subject: Re: Northstar j NS33 Skip and Pat, This answers my questions. I know that inadvertently sidetracking is a risk, but it becomes of concern when potential hydrocarbon zones are open to the wellbore. For professional curiosity, any thoughts on how the departure occurred? Cementing the entire liner should effect isolation. Call or message with any questions. Tom Maunder, PE AOGCC Coyner, Skip (NATCHIQ) wrote, On 4/2/2007 11:10 AM: 1. Yes the Kuparuk C was drilled in the original hale. The formations exposed in the original hole are Kalubik shale, Kuparuk D shale and Kuparuk C sands (tight). The Kuparuk C is the only possible hydrocabon bearing zone exposed. The original hole TD'd at the base of the Kuparuk C sands and did not penetrate any Kuparuk A sands. 2. After penetrating the Kuparuk C in the original hole, our BGG increased from 134 to 329 with 10.3 ppg mud. We think it is too tight to be productive. 3. The horizontal separation at the T/Kuparuk C is < 300 ft 4. Ori final ST-1 T/Kuparuk 22420' MD / 8905' TVD 22310' MD 18885' TVD T/Kuparuk C 23003' MD / 9115' TVD 22810' MD / 9113' TVD It is our plan to run the 9-518" drilling liner from the basal Kuparuk shale up into the 11-3/4" casing with TOL at 16300' MD. Furthermore, we intend to cement the liner all the way back through the 7n 1/2oa7 Page 2 of 3 liner lap including class G tail scurry to cover the Kuparuk and the sidetrack point. Even so, our lead cement is Lite Crete which has adequate compressive strength to yield effective zonal isolation. Let me know if you need anything else. Skp Coy~+' 907-564-4395 BPXA 907-240-8412 cell From: Thomas Maunder [mailto;tom_maunder@adminstate.ak.us] Sent: Monday, April 02, 2007 10:23 AM To: Coyner, Skip (NATCHIQ) Cc: Archey, Pat Subject: Re: Northstar /NS33 Skip, This prompts a couple more questions ... 1. Was the Kuparuk penetrated? 2. Were hydrocarbons present? 3. How far from the original penetration is the new wellbore? 4. What are the tvds for the various mds ie td of lost section, top of Kuparuk, etc. Tom Maunder, PE AOGCC Coyner, Skip (NATCHIQ) wrote, On 4/2!2007 10:16 AM: 23236' MD Skip Coyner 907-564-4395 BPXA 907-240-8412 cell From: Thomas Maunder [mailto:tom maunder@admin.state.ak.us] Sent: Monday, April 02, 2007 10:09 AM To: Coyner, Skip (NATCHIQ) Cc: Archey, Pat; Stewman, Sondra D Subject: Re: Northstar /NS33 Skip, What was the TD of the lost section? Tom Coyner, Skip (NATCHIQ) wrote, On 4/2/2007 10:04 AM: Tom, 7/11/2007 • • Page 3 of 3 White washing and reaming to bottom last Friday, we inadvertently did a low-side sidetrack. The sidetrack point seems to be near the base of the HRZ at +/- 21828' M©. Today we are drilling the sidetrack hole through the Kuparuk C and we plan to set the 9-5/8" liner in the basal Kuparik shale at +/- 23320' MD / 9375' TVD. I am not certain if a Sundry Notice is required at this point. Skip Cvyner 907-564-4395 BPXA 907-240-8412 cell 7/11/2007 Re: Northstar NS33 /BOP Test • Subject: Re: Northstar NS33 /BOP Test From: Thomas Maunder <tom_maunder~~admin.state.ak.us> Date: Tue, 27 Mar ?007 10:04:59 -0800 To: "~~i~~~~~~~r. Sl:i~i i;NATCHIQ)" <Ship_Coy»~~r ~~f~h.rc~m> (C "_~rch~~_ i'~i[" ~ I'atr•ick.flrche~ a:131'.c~~m 1(_)(~C'C N~~rlh Sl~~~c (>1~(icc io ~cc ~~ruclh~~c hay<<r'a~ii7~in.slalr.al:.us~~ ~~'j (p-- ~ ~~ Skip, It is acceptable to TD the section prior to conducting the test. In our conversation, you indicated that since drillout the bit has been on bottom other than a wiper trip to the shoe performed a week ago. The BOP must be test prior to the next trip into the hole. Call or message with any questions. Tom Maunder, PE AOGCC Coyner, Skip (NATCHIQ} wrote, On 3/27/2007 9:52 AM: Tom, As we discussed, NS33 is +/- 300 ft short of casing point (T/Mifuveach). Our BOP test is due today. We respectfully request an additional 12 to 24 hours to finish the hole and get back to the shoe for the BOP test. I left a telephone message for you yesterday but I did not realize that it was a State holiday. We should be able to finish this hole section by mid-afternoon today and then get out of the hole sometime tomorrow morning. Your consideration in this matter is appreciated. Skip Coyner 907-564-4395 BPXA 907-240-8412 cell 1 of 1 3/27/2007 10:08 AM Re: Northstar /NS33 • Subject: Re: Northstar /NS33 From: Thomas Maunder <tone_maunder@admin.state.ak.tts> Date: Tue, 06 Mar 2007 12:02:48 -0900 To: "C~wncr, ~Icip,(NATCHIQ)" <Skip.Coyner(tt~bp.com== C'C: "1)in~~cr. R~lichacl ~" ~"~9ichael.Dinctr'«13P.ci~m>. "_~lrehc~. I'ai" ~-['atrick.:~ichr,y(a~I3['.c~~m=-- 10GCC North Sl~~pe Uftic~~ ~~ao~cc~~rudhoe bav~a>admin.state.ak.us=- ~a ~ -~ ~~g Skip, There is not a problem with your proposal. It would seem that there isn't a need to have made the request. By successfully accomplishing your last primary cementing operation, isolation with the open hole intervals has been achieved and operations in the prior hole section completed. Your operation is not under any requirement to test the new NU on any time schedule related to the operations you have just completed. The initial BOP test for the new NU is in preparation for drilling the new hole section and there is much preparatory work to do prior to even tripping in the hole that will take multiple days. The rig supervisor's should contact the Inspectors with the usual notice, although given the requirements for travel to North Star notice earlier than that may be appropriate. If you or the others have any questions, please message or call. Tom Maunder, PE AOGCC Coyner, Skip (NATCHIQ) wrote, On 3/6/2007 11:25 AM: Tom, Pursuant to our discussion this morning, our WSL's on 33E spoke with the AOGCC field inspector about our BOP switch and subsequent test thereof. As you know, we are in the process of of re-starting the production facility at Northstar and non-essential person are on the beach for a few hours. We should be back at work this evening, at which time, we will ND the 16-3/4" BOP and NU Nabors' 13-5/8" BOP. That may take a few days. We also need to prepare the rig for MOBM. We respectfully request that the initial test of the 13-5/8" BOP's take place when we have all of our miscellaneous surface work finished and we are ready to trip in the hole to drill out. Skip Coyner 907-564-4395 BPXA 907-240-8412 cell 1 of 1 ~ 3/6/2007 12:22 PM about: b tank Good news. Coyner, Skip (NATCHIQ) wrote, On 3/5/2007 3:40 PM: 11-3/4" casing set & cemented at 16,494' MD. Yee Haaa. That hole was smooth. We'fl be changing out BOl s this week. '', Skip Coyner 907-564-4395 BPXA 907-240-8412 cell N~`"~~ ~- I of 1 3/6/2007 7:47 AM • - - ~- -- N 5 '- ~ j 11.75in Casing Run -March 2-3 2007 (Model Revised 3/3/2007) Report {~~;Q41i.SF~ 4, 2007 a~~._ ~ 3~ OFF CSG 0.40 OH 0.40 1000 FF CSG 0.30 OH 0.30 - - FF CSG 0.20 OH 0.20 i 2000 1 - -_- FF CSG 0.10 OH 0.10 - :.. - ~ ~ Modeled Rotating Weight 3000 ~ 11.75in Casing Run - -- ' --:.:: __ ~ . Rig Input --- - 4000 ---- ~ GR/2 /r' - - ~ GSJ 5000 r ~ 6000 ~'~ } 7000 ~ ~ ~(c gO~Cc WCA~ ~ ._ ~-='7 m 8000 ~ -- _ _ z; - __- L~ o d r-_ . ~_ - ; ----- - -____... . -- _ -- i ' c.~ 04 ., _-', - ~ •-~: 10000 3.c -- ~ - _ _;- ~_ -- - -_ `~- - _- ~ __. -- - 11000 ~~ - _. ___ . __ __ ~-- - . _-- ~ ~~ ---- - _ 12000. _ #` - _- - _ _. :~. - _ = ~ -_ , -- - ..-- >~ >: ~ _ _ ~ ~ ---- --- 13000 ~_ ~ ~ - _ _ --_- _ - < - -- _ _ t= _== - ~ _~ - ~" 14000: `_-c _ -~ ~ _ _. ~ __ _ - __,- ~- ~. _.__ ~ 3 ~; 15000 -..: - = ._, _ ~ _.. ___ -_ 16000 % _- _` , `~ _ 0 100 200 300 400 500 600 700 800 y FRANK H. MURKOWSKI, GOVERNOR - > ~RA O~ ~ ~ 333 W. 7"' AVENUE, SUITE 100 COI~TSERVAZ'IO1~T CODII~'IISSIOI~T ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 27&7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Northstar Field, Northstar Oil Pool, NS33 BP Exploration (Alaska) Inc. Permit No: 206-138 Surface Location: 1369' FSL, 650' FEL, SEC. 11, T13N, R13E, UM Bottomhole Location: 1106' FNL, 2014' FEL, SEC. 32, T14E, R13E, UM Dear Mr. Archey: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). DATED this~day of October, 2006 cc: Department of Fish 8v Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~~~ 5f~afi~ 5 ~"~~~ STATE OF ALASKA ALAS IL AND GAS CONSER~/ATION COMMI~N PERMIT TO DRILL 20 AAC 25.005 ~E~EIV~¢D~B~ sE~ 2 $ 2aos Alaska Oil & Gas Cons. Commission 1 a. Type of work ® Drill ^ Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is plljp ~~pr: ^Coalbed Methane lJ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well. Name and Number: N5~33 ~ 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 25638 TVD 11136 12. Field /Pool(s): Northstar Unit 4a. Location of Well (Governmental Section): Surface: 1369' FSL 650' FEL SEC 11 T13N R13E UM 7. Property Designation: ADL 312798 , , , , . , Top of Productive Horizon: 1211' FNL, 1879' FEL, SEC. 32, T14N, R13E, UM 8. Land Use Permit: LO-N96-006 13. Approximate Sp te: Janua 20, 007 Total Depth: 1106' FNL, 2014' FEL, SEC. 32, T14N, R13E, UM 9. Acres in Property: 4392.82 14. Distance to N est Property: 643' 4b. Location of Well (State Base Plane Coordinates): Surface: x-659820.92 y-6031141.26 Zone-ASP4 10. KB Elevation (Height above GL): 56' feet 15. Distance to Nearest Well Within Pool: 4200' away NS21 16. Deviated Wells: Kickoff Depth: 200 feet Maximum Hole An le: 71 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 5095 Surface: 3981 ~ 1 _ Casir+ Pro ram: S cificato ns To - Se in De h -Bo ttom Quantit of Cement c.f. orsacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 24" 245.6# X-56 Welded 190' Surface Surface 190' 190' Driven 21" 16" 84# HCL-80 BTC 4515' Surface Surface 4515' 3173' 1277 sx ASL 1954 sx Class 'G' ' 14-3/4" 11-3/4" 60# -95 563 16161' Surface Surface 1 161' 6976' 1371 sx LiteCrete 469 sx Class 'G' 10-5/8" 9-5/8" 47# HCL-80 513 7473' 16011' 6927' 23484' 9456' 1347 sx LiteCrete 379 sx Class 'G' 8-1 /2" 7-5/8" 29.7# S-95 513 2055' 23334' 9373' 25389' 10932' 366 sx Class 'G' 6-3/4" 4-1/2" 12.6# 13-CR Vam 418' 25220' 10793' 25638' 11136' Uncemented Slotted Liner 1 g. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): asing Length ize ement Volume MD TVD Conductor /Structural Surface Intermediate Pr ucti n Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments ®Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ® Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Printed Name Pat Archey Si nature ~ Contact Skip Coyner, 564-4395 Title Senior Drilling Engineer Prepared By Name/Number: Phone 564-5803 Date -~ -~,6 Sondra Stewman, 564-4750 Commission Use Onl Permit To Drill Number: 2 ~ API Number: c~ 50- ©.Z ! " ~ 3 3 2 S Permit A royal See cover letter for Date: ' ~ other re uirements Conditions of Approval: If box is chencked, well may not be used to explore for, test, or produce Coalbed methane, gas hydrates, or gas contained shales: 5 ~ f ~0'3~~' ~r ~ O l- C tCJ 2. Sty D C.c,~ Samples Req'd: r ^ Yes ~No Mud Log Req'd: ^ Yes ~No ~ S{- f 3 _5(B" (3 D ~ ~ ~d $00 O ~ ~, HZS Measures: Yes ^ No Directi I Survey Req'd: ,Yes ^ No Other: i~Hvsua~.t '~'~ 2o~C ZS. 0 3 ~ ~ h 1 ~/~, r~..~f~v-4.sc, a (~O (2 ~ t S 9 f~0(!e feu/suc.~,tt' t~ 2U mac.. ~. °3~ ~~)Cz), d,~,V~.v~-,~r. ve~~~ s ~,~~d. `,D w / I D~ P VED BY THE COMMISSION Date o ,COMMISSIONER Form 10-401 Revised 1212005 /1 ~ ~ ~ ~~ ~ ~~ ~ Submit In Duplicate ft„J~ (~' NA L • by .`til!,. ~_ %.~s~ To: Winton Aubert - AOGCC/ Kyle Monkelien MMS From: Skip Coyner Northstar Drilling Engineer Subject: Northstar NS33 Application for Drilling Permit Mr. Aubert and Mr. Monkelein, • BP Exploration Alaska Inc. Date: September 18, 2007 NS33 is currently scheduled to be drilled by Nabors 33E with operations commencing on or about January 20, 2007, depending on ice-road access. NS33 is an ERD well which incorporates a 5-string well design. As such, an extra casing string will be set in the T/Colville: thus casing off the Ugnu, West Sak and Schrader Bluff before drilling ahead. The additional casing string divides the typical intermediate hole section into two distinct sections. As such, this approach improves the overall wellbore stability while drilling. Although the NS33 well plan passes Major Risk criteria, there is a close approach issue for this well as it passes NS32: a disposal well. In accordance with Northstar Policy covering close approach above the SSSV, NS32 is not required to be shut in. However, we plan to constantly monitor the OA and IA pressures while drilling and opening the ~ surface hole. The monitoring will be done by the mudloggers and/or facilities personnel. A Diverter waiver is hereby requested for NS33. To date, no development well drilled ~ through the Northstar upper stratigraphic intervals has experienced any difficulty with shallow gas. All surface holes have been drilled and cemented to a common depth of approximately 3,170' TVDss depth, 0150' TVD below the top of the SV6), with the exception of one well, which extends into the SV5 3280' TVDss. Well mud logs and seismic data do not indicate the presence of a shallow gas hazard. To accommodate the extra casing string, the surface casing in NS33 will be 16". We plan to install 16-3/4" BOPE on the 16" surface casing in accordance with 20 AAC 25. 035 (e)(2)(A). This BOP stack will be used while drilling to the T/Colville only. As such, t maximum anticipated surface pressure (full column of gas from TD to surface) is 18 psi. The 16-3/4" BOP stack will include: (1) annular preventer, (1) set of pipe rams and (1) set of blind rams in accordance with 20 AAC 25.035 (e)(1)(A). For the first intermediate string, we plan to set and cement 11-3/4" casing into the T/Colville at 16,161' MD / 6976' TVD. Prior to running the 11-3/4" casing, the pipe rams will be changed to 11-3/4" casing rams and the bonnet seals tested to ~-596'psi. ~ ~ G~.. 25o d In the remaining hole sections (below the 11-3/4" intermediate casing), the maximum anticipated surface pressure (full column of gas from TD to surface) is 3981 psi. For these remaining hole sections, we will be utilizing Nabors 33E 5000 psi four preventer stack (3 rams and an annular) in accordance with 20 ACC 25.35 (e)(2)(B). • • The subsequent operations require two (2) drilling liners: +/- 7500 ft 9-5/8" drilling liner, and +/- 2055 ft 7-5/8" drilling liner. For these operations, we are requesting a variance to 20 AAC 25.35 (e)(2)(B)(iv) that requires 2 ram preventers for the liner AND 2 ram preventers for the DP. We propose instead to use one (1) casing ram for the liners when run and a VBR to cover any size drill pipe used in the running string. This proposal would provide one ram and the annular preventer for the liner, as well as, one ram and the annular preventer for the DP. This scheme does not necessitate changing both pipe rams after picking up the liners. In the event of a well control incident, our standard practice is to immediately cross-over to DP to allow annular to ram stripping (if required). NS33 will utilize gas detection equipment the entire well. It is also planned to use mudlogging services below the surface casing to TD. In that the depth of this well precludes the use of slick line deployed BHP bombs, we hereby request a waiver to Field Rule 5 "Reservoir Pressure Management and iMonitoring': As such, we respectfully request that no BHP bomb be required. `Please find attached the NS33 Well Plan Summary, directional plan, and proposed completion diagram. If you should have any questions or concerns, please contact me @ 564-4395. Sincerely, n ~. Skip ~ ner BP Northstar Operations Drilling Engineer 564-4395 ~~it1Pd f'LO'1-~t~~~~1T~~ Y~ ~~ vK d N ~ Uti,t~.io Q'S d`~e?~ QS `""~°Vi rp U~ ~ E'~c`~r~~~ C'~ Y iD,,~ .- ~ Wry. ~ "~ z i~~ r ~ __ 'I NORTX PROCESS MODULE 111 ~;sU~-~ J .. _ >:~`:: •~ ~ \' I aa~ I N Z a -N- .~' ~. i GRAPHIC SCALE 0 s0 1ee zee ( IN FEET ) 1 inch = 100 ft. NOTES 1. DATE OF SURVEY: MAY 20-21, 2006 2. REFERENCE FIELD BOOK: W006-07 PGS. 26-34. 3 ALASKA STATE PLANE COORDINATE `, ip ~ ~ ,- .A . _ ~. VICINITY MAP N.T.S. ,~~ °OF q~ .`P°°°° °°°~`s/r ~ °° °°°9 °°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° '~,°°° Leonard J. O'Hanley .s °° 11386 °° ~'~fssloNn~- `~~ SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF MAY 21, 2006. LEGEND AS-BUILT CONDUCTOR • EXISTING WELL • S ARE ZONE 4, NAD 27. GEODETIC POSITIONS ARE NAD '27. 4. BASIS OF HORIZONTAL CONTROL IS BASED ON MONUMENT "NORTHSTAR SOUTH" BY F.R. BELL & ASSOCIATES Y=6,030,825.85 X=659,730.28. 5. MEAN PAD SCALE FACTOR IS 0.99992896. 6. ELEVATIONS ARE BPX MEAN SEA LEVEL (M.S.L.) DATUM. ~ r)cQTF~ V1I1TH1N PR(1TR4(`TF'll CC!` 11 T ~ z Ai o ~ z r i iur A T WELL A.S.P. PLANT GEODETIC VGEODETIC CELLAR ,BOX ^SECTION N0. COORDINATES COORDINATE POSITION(DMS) POSITION(D.DD ELEV. OFFSETS NS-33 Y= 6,031,141.26 N 5229.95 70'29'29.845" ' 70.4916236' 16 1' 1369' FSL X= 659,820.92 E 992.18 148'41 36.032" 148.6933422' . 650' FEL NS-36 Y= 6,031,171.22 N 5259.94 70'29'30.140" ' 70.4917056' 16 1 1400' FSL X= 659,819.46 E 992.29 148'41 36.056" 148.6933489' ' 650' FEL F. Robert DRANTI: FENne O CHECKED:K~ 0 ~ DATE: 5/24/06 '~ DRAWING: FR806 NS 01-00 sKEEr: ~ ,1DB ND: NORTHSTAR ISLAND ®~I~~OO ~o AS-BUILT CONDUCTORS B S 24 0 ISSUlD FOR INFORMATION um wa aw~cmn SCALE: 1 of 1 J11F KxH NS-33 & NS-36 N0. OATE REVISION BY CHK µ~+•a~~. ~vw.,w 1"~100~ • ''~'"" ' cal 3 MODULE RIG RIO -33C SUPPORT MOD 8 PIPESMED 0 B e S .' r 0 W Q W J F- O Z FEDERAL LEASE # Y1645 ice NOT LEASED ~ »uer sen •n'~ Y ~Fe~~9 EgSF -N- FEDERAL LEASE _ N~rNSr"SAL `''~~ # Y0179 __ PLANNED BHL ~ PLANNED TARGET .m ~~ ~'~ ~' p.ts. - ~a.- -- _~. 564' l 643' STATE LEASE # ADL312799 STATE LEASE ~~ # ADL312798 N15 --NORTH STAR UNIT BOUNDAR N TS NORTH STAR PRODU~T~ON FACILITY SEAL ISLA NOT LEASED -- OF ~E °° A~ ,~P°°°°°~° ° ~ °49 ~ ~ °9~ °°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°° Leonard J. O'Hanley '° 11386 'mss iorin~- `~~ SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING [N THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS COMPUTATIONS MADE UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS DERIVED FROM THE SUPPLIED BOTTOM HOLE LOCATION IS CORRECT AS OF JUNE 15, 2006. I DO NOT CERTIFY THE CORRECTNESS OF THE BOTTOM HOLE COORDINATE VALUES SUPPLIED TO ME. LOCATION DESC. A.S.P. COORDINATES GEODETIC POSITION DMS GEODETIC POSITION D.DD MINIMUM DISTANCE TO STATE LEASE BOUNDARY PLANNED Y= 6044050 09 70'31'40 257" 70 5278491' ' TARGET . X- 642461.19 . 148'49'59.542" . 148.8332061' 643 NSN33D Y= 6044152.75 70'31'41.292" ' " 70.5281367' 564' BHL X= 642323.76 148'50 03.535 148.8343153' (~ CHECKED: CMC b~ O I I DATE: B/15/OS ~+ II ~U~n ~' DRAWING: FRe Ns 0~-e0 NORTHSTAR UNIT - NS 33 SHEET: ~ ~4~0~ CDR ND: PLANNED TARGET AND ®a „ m ISSUW ~ ,wFORMnnoN ~ ~.H ~"`"' "° ~°>v""`"°~ SCALE: BOTTOM HOLE LOCATIONS ~ ~ ~ No. DArF REV~sIeN Rv (]IK o 6Fl ~ ,,,., 1'=5000' STATE LEASE # ADL312808 LEGEND PLANNED NS-33 BOTTOM HOLE LOCATION (BHL) ~- PLANNED NS-33 TARGET LOCATION ~IOrEs 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD '27. 2. GEOGRAPHIC COORDINATES ARE NAD27. 3. STATE LEASE BOUNDARIES PROVIDED BY BPX CARTOGRAPHY DEPT. AND ARE BASED ON DATA SUPPLIED BY THE ALASKA DEPT. OF NATURAL RESOURCES. 4. TARGET LOCATION AND BOTTOM HOLE LOCATION COPIED FROM SCHLUMBERGER NS-33 DIRECTIONAL DRILLING PLAN N0. 9 DATED MAY 17, 2006. GRAPHIC SCALE 0 2500 5000 10000 ( IN FEET ) 1 inch = 5000ft. • NS 3 3 Permit to Drill NS33 Scope • NS-33 will be drilled to develop reserves in the Ivishak Formation. The targeted reserves are in the primary Northstar Ivishak structure. The target location (T/Sag) is located some 21,635' northwest of Northstar island. As such, NS33 will be the longest well (VS) drilled at Northstar and will be the longest well (VS) in Alaska. TMD will be 25,638'. VS at TMD will be 21,806'. The well will utilize 24" drive pipe which was installed in May, 2006. NS33 will have 16" surface casing installed with the shoe between the SV6 and the SV5 as is the norm. A string of 11-3/4" intermediate casing will be set and cemented through the Ugnu and Schrader Bluff sands with the shoe into the top of the Colville mudstones. Below the 11-3/4" intermediate casing a 10-5/8" hole will be drilled and under reamed to 12-1/4" with a RWD tool. It is planned to use MOBM to drill this hole section. A 9-5/8" drilling liner will be set and cemented in place with the shoe into the Miluveach. Next, an 8-1/2" hole will be drilled and under reamed to 9-1/2" with a RWD tool. MOBM will be used for this hole section as well. A 7-5/8" drilling liner will be set and cemented in place with the shoe into the top of the Sag River formation. Finally, the production zone will be drilled using a 6-3/4" bit to TD. Then a 4- 1/2" production liner will be set with blank pipe down to the T/Ivishak and slotted pipe below. The blank and slotted sections will be separated by an external "Swell" packer. Aliner-top / packer and PBR will be used for annular isolation. The well will be completed with 4-1/2" chrome tubing as is the norm. Pre-Riq Work: 1. Install the ABB Vetco 24" mudline hanger profile and 24" riser adapter. Inspect the cellar and make any necessary repairs. Drilling Riq Operation: 1. MIRU Nabors 33E with High-Torque Top Drive and additional mud pump. RU pressure monitoring equipment on NS32 to monitor the IA and OA while drilling the surface hole. 2. Nipple up and leak-test the 24" bell nipple. NOTE: A diverter dispensation is requested in the attached letter ~ 3. MU 16" drilling assembly with MWD/GR and directionally drill surface hole to +/- 4515': 150' TVD below the top of the B/SV6 marker. Surface casing point has been picked at 4515' MD (+/-3173' TVD rk .Circulate the hole clean. POOH. 4. Open the surface hole to 1" and prepare to run surface casing. POOH. 5. Run 16", 84# surface casing. Land the 16" casing in the mudline hanger profile. 6. Cement the casing to surface in 1 stage (lead and tail) using an inner string and "stab-in" float equipment. Check the floats, CBU and POOH with the inner string. 7. NU and test the 16-3/4", 5000 psi wellhead. NU and test the 16-3/4" BOPE to 250/2500 psl. Note: the 16-3/4" BOPE is for this intermediate hole section only (SV5 to T/Colville) and the test pressure is based upon the maximum BHP in this hole section less gas gradient to surface. 8. MU 14-3/4" rotary steer-able BHA and enough drill pipe to reach the next casing point at 16,160'. RIH to float collar. Test the 16" casing to 2500 psi with 9.3-ppg mud for 30 min. 9. Drill out the shoe track. Drill 20' of new formation below the 16" shoe and perform FIT to a minimum of 11.5 ppg EMW. (FIT/LOT procedure on file with AOGCC). 9/18/2006 Page 1 of 10 NS33 Permit to Drill 10. Drill 14-3/4" intermediate hole to the 11-3/4" casing point (+/- 16,160' MD) into the top of the Colville. Have mud loggers rigged up and functional to drill this hole section. 11. Condition the hole to run casing. Circulate the hole clean. POOH 12. Set and cement 11-3/4", 60# casing. TOC to be at the top of the SV2 sand. This is a ~ single-stage cement job with lead and tail slurries. Displace the cement with 9.3 ppg MOBM. WOC before ND 16-3/4" BOPE. 13. ND the 16-3/4" BOP stack. Set the 11-3/4" slips, cut off and dress the 11-3/4" and set the pack off. NU and test the 16-3/4" x 13-5/8" tubing head. 14. After installing and testing the 11-3/4" pack off and the tubing head, down-squeeze the 11-3/4" x 16" annulus with one annular volume of mud followed by diesel to +/- 2000' TVD for freeze protection: +/- 182 bbls. 15. NU and test 13-5/8" BODE to 250/5000 psi (Annular to 3500 psi) for 30 minutes. / 16. Displace the surface system with 9.3 ppg MOBM. 17. MU 10-5/8" rotary steer-able assembly including RWD tool. RIH to the float collar. Test the 11-3/4" casing to 2500 psi with 9.3-ppg mud for 30 min. 18. Drill out the shoe track. Drill 20' of new formation below 11-3/4" shoe. Perform an FIT to / a minimum of 12.5 ppg EMW. (FIT/LOT procedure on file with AOGCC). 19. Drill 10-5/8" x 12-1/4" intermediate hole to the 9-5/8" liner point (+/- 23,484' MD) into the top of the Miluveach. Have the mud loggers rigged up and functional. Have minimum mud weights of 9.8 ppg at the top of HRZ, 10.3 ppg at the top of Kuparuk and 10.5 ppg at l the liner point in the Miluveach. Circulate and condition the hole. POOH to run the liner. 20. Run, set and cement the 9-5/8", 47#, flush-joint drilling liner. After cementing the liner, set the liner-top packer. Circulate the casing clean. Test the TOL to 1000 psi. POOH. 21. MU 8-1/2" rotary steer-able assembly including a Rhino Reamer. RIH to the float collar. Test the 9-5/8" liner, liner top PKR and 11-3/4" casing to 2500 psi. 22. Drill out the shoe track and 20' of new formation below 9-5/8" shoe. Perform an FIT to a ~ minimum of 14.5 ppg EMW, (FIT/LOT procedure on file with AOGCC). 23. Ensure the mud is in good condition prior to drilling ahead. Drill the Kingak and < 40 ft into the top of the Sag River. This drilling liner setting is estimated to be at 25,389' MD. Increase the mud weight to > 12.5 while circulating the hole clean. POOH. 24. Run, set and cement a 7-5/8", 29.7# flush-joint drilling liner. Set the liner top packer. Circulate excess cement from well bore. Test the TOL to 1000 psi. POOH. 25. Displace the well with 9.3 ppg, brine-based "Drill-In" fluid. Check for flow. 26. POOH and lay down liner running tools. Re-configure the tapered drill string. 27. RIH w/ 6-3/4" bit and BHA. Clean out the 7-5/8" liner down to the landing collar. Test the casing and both liners to 2500 psi. 28. Drill out the shoe track and 20' of new formation below the 7-5/8" shoe. Perform an FIT to 12.0 ppg. EMW (FIT/LOT procedure on file with AOGCC). 29. Drill a 6-3/4" production interval to the proposed TD at 25,638' MD (11,136' TVD), is above the O/W contact in the Ivishak. Circulate the hole clean. POOH. which ~ 30. Run and set the 4-1/2" 12.6# 13Chrome liner with slotted joints across the Ivishak pay zone. Run a swell packer and blank joints from the T/Ivishak up to the liner hanger assembly. The liner hanger assembly includes a 40-ft PBR, Flex-Lock hanger and a ZXP. Set the liner hanger and the liner top packer. 9/18/2006 Page 2 of 10 NS33 Permit to Drill 31. With the liner setting tool pack off still inside the PBR, test the 9 5/8" casing x 7-5/8" drilling liner x 4-1/2" ZXP to 2500 psi for 30 minutes. 32. Circulate the casing and liners clean. Spot ahigh-LSRV pill on bottom prior to LDDP. 33. LDDP and the liner running tools. 34. PU the PBR seal assembly and spacer tube. PU the 4-1/2" 12.6# 13Chrome Vam TOP tubing. Externally test the tubing while RIH. Run GLM's and X nipples at 7000' and 4000' MD (see diagram). Run ashear-valve in the GLM at 4000' MD. Run a TRSSV at +/- ~; 1000' MD and control line back to surface. Note: an "I-wire" will not be run in this well. 35. Tag the PBR and space out the tubing. Install the tubing hanger, etc. Displace the well with clean packer fluid mixed at 9.3 ppg. Sting into the PBR and land the hanger. RILDS. Test the SSV control lines and tubing hanger seals to 5000 psi. 36. RU SLU. Set a plug in the X nipple below +/- 4000' MD and test to 4500 psi. RD SLU. 37. Set the TWC valve in tubing hanger. Close the TRSSV. ND BOPs. NU the 13-5/8" 5000 psi x 7-1/16" 5000 psi tubing head adapter and the 5-1/8" x 5000 psi tree. 38. Test the tubing head adapter and tree to 5000 psi. Pull TWC valve. Open the TRSSV. 39. Pressure up the tubing to 3000 psi (against the PX plug). Test the inner annulus to 4500 psi for 30 minutes (on chart). Bleed down the IA pressure to 3000 psi. Bleed off the SITP to open the shear valve in the upper gas lift mandrel. Freeze protect the tubing and IA through the GLM at 4000' MD with diesel and/or methanol. 40. RU SLU. Replace the shear-valve with a dummy GLV. Test the GLV against the PX plug to 4500 psi. RD SLU. Install BPV. 41. Ensure all tree and annulus valves are all secured. Close the TRSSV. / 42. Release Nabors 33E and move off the well. Post-Rig Work: ~. Install "S-Riser and flow line connections. 2. MIRU slickline. Pull the BPV. Open the TRSSV. s. Retrieve the PX plug. 4. .Run BHP bombs as deep as possible. Record the BHP at gage depth. Make pressure and temperature "gradient stops" while RIH with the bombs. Calculate the initial SIBHP and BHT using the extrapolation method as allowed in Field Rule 5 (d). 5. RD SLU. s. Flow back the freeze protect fluid and load water. Test the well for production. 9/18/2006 Page 3 of 10 BP Northstar NS34 Permit Data General Information Type of Well: Ivishak Producer Northstar Slot: NS33 Surface Location: 1369' FSL, 650' FEL, Sec. 11, T13N, R13E, UM ~ X = 659,820.92 Y = 6,031,141.26 Target (Top of SAG): 1210.8 FNL, 1878.5' FEL, Sec. 32, T14N, R13E, UM 200' Radius X = 642,461.19 Y = 6,044,050.09 10,891' TVD Bottom Hole Location: 1105.5 FNL, 2013.6 FEL, Sec. 32, T14N, R13E, UM ~ X = 642,323.76 Y = 6,044,152.75 11,136' TVD AFE Number: Rig: Nabor 3 Estimated Start Date: 2/1/2007 O eratin da s: 80 MD: 25,638' TVDrkb: 11,136' RKB/Surface Elevation: (a.m.s.l.) 56'/16' Well Desi n conventional, etc.): 5-Strin , Bi Bore w/ PBR Com letion Objective: Ivishak Producer Well Name: NS-33 API Number: BHP (Ivishak): 5082 psi at 11,076' TVDrkb EMW: 8.82 ppg BHT: 254 °F @ 11,100' TVDss Land Use Permit: LO-N96-006 Distance to Nearest Property at T/Sag: 643' to the State Lease Line: ADL312798 Distance to Nearest Well within Pool: NS21, Northstar pool is +/- 4200' Southeast MECHANICAL CONDITION: Cellar box: Elevation above MSL = 16' RKB to Cellar box: 40' (Estimated) Rig Elevation: RKB +MSL = 56' Conductor: 190' MD rkb of 24", 245.6#, X-56 drive i e 9/18/20062006 Page 4 of 10 BP Northstar NS34 Permit Data Formation To sand Estimated Pore Pressures Est imated To s Hydrocarbon Estimated Formation TVD TVD MD Bearing Pore Press. SS RKB RKB Y/N P5I PPG To Permafrost 1,150 1,206 1,230 N 542 8.65 Base Permafrost 1,520 1,576 1,630 N 709 8.65 5V6 - to confinin zone 2,979 3,035 4,092 N 1365 8.65 Surface casin oint 3,117 3,173 4,515 SV5 -base confinin zone 3,255 3,311. 4,937 N 1489 8.65 5V4 3,560 3,616 5,871 N 1626 8.65 SV2 - to u er in"ection zone 3,950 4,006 7,066 N 1802 8.65 SVl - to ma'or shale barrier 4,350 4,406 8,291 N 1982 8.65 TMBK - to lower in'ection zone: T/U nu 4,675 4,731 9,286 N 2128 8.65 WS1 - to Schrader Bluff - Base U nu 6,200 6,256 13,386 N 2814 8.65 CM3 -Base lower in'ection zone: T/Colville 6,870 6,926 16,008 N 3115 8.65 Intermediate casin oint 6,920 6,976 16,161 THRZ - To HRZ 8,704 8,760 21,624 N 3940 8.65 BHRZ -Base HRZ 8,714 8,770 21,654 N 3945 8.65 To Ku aruk 8,975 9,031 22,454 N 4424 9.42 Ku aruk C 9,120 9,176 22,894 Y 4490 9.41 To Miluveach 9,360 9,416 23,414 N ls` Intermediate Liner oint 9,400 9,456 23,484 To Kin ak 9,860 9,916 24,147 N Geol target #1- T/Sag River 10,835 10,891 25,339 Y 5040 8.90 2"~ Intermediate Liner oint 10,876 10,932 25,389 To Shublik - 90 10,925 10,981 25,449 N 5060 8.86 To Ivishak 11,020 11,076 25,565 Y 5082 8.82 Total De th 11,080 11,136 25,638 Y 5095 8.80 Oil -Water contact 11,100 11,156 n/a Comments 1. Note: Anomalous high gas readings reported in Seal A-01 mud log at the following intervals, 3690-3775; 3925 - 4050; 4140 - 4425, 4510 - 4700 MD - No significant Gas shows in NS10 through NS17 through this interval -max gas = 70 units. 2. Depth predictions based on NS13, NS14, NS27, Seal A-1, NS29, Seal A-3 wells and comparison to 3D seismic volume. 3. Pore pressures estimated using data from offset wells. CASING/TUBING PROGRAM: Casin Strin Hole / Casin Des ri ti Measured Depth Vertical Depth Length g g Size g p c on Top Bottom Top Bottom Feet Conductor 24", 245.6#, X56 Welded Surface 190 Surface 190 190 Surf CSG 21 16", 84#, HCL-80, BTC Surface 4515 Surface 3173 4515 Inter. CSG 14-3/4 11-3/4", 60#, S-95, 563 Surface 16161 Surface 6976 16161 Drlg. LNR #1 10-5/8 9-5/8", 47#, HCL-80, 513 16011 23484 6927 9456 7473 Drlg. LNR #2 8-1/2 7-5/8", S-95, 29.7#, 513 23334 25389 9373 10932 2055 Prod LNR 6-3/4 4-1/2" 12.6# 13-CR Vam 25220 25638 10793 11136 418 Tubing - 4-1/2" 12.6# 13-CR Vam Surface 25220 Surface 10793 25220 ~~~ -o . 3 lo.s 17. s" 9/18/20062006 Page 5 of 10 BP Northstar NS34 Permit Data Tubular S ecifications: Collapse Burst Tensile ID Make-up Torque Surface casin : 16", 84#, HCL-80, BTC 100% 1910 si 4330 si 1,929,000 Ib 15.010" ID To Position 80% 1528 psi 3464 si 1,543,000 Ib 14.822" Drift Intermediate casin 11-3/4", 60#, S-95, Hydril 563 100% 4410 si 6920 si 1,644,000 Ib 10.772" ID 80% 3528 psi 5536 psi 1,315,000 Ib 10.625" Drift 22,500 ft-Ib (min) Drillin Liner #1: 9-5/8", 47#, HCL-80, H dril 513 100% 7100 si 6870 si 901,000 Ib 8.681" ID 17,000 ft-Ib opt 80% 5680 si 5496 si 721,200 Ib 8.525" Drift 14,000 ft-Ib min) Drillin liner #2: 7-5/8", 29.7#, S-95, H dril 513 100% 7150 si 8180 si 567,000 Ib 6.875" ID 10,800 ft-Ib o t 80% 5720 si 6544 si 453,600 Ib 6.750" Drift 9,000 ft-Ib min Production liner: 4-1/2", 12.6#, 13Cr-80 Slotted and Blank 100% N/A N/A N/A 3 " ID 4880 max .958 4440 o t 80% N/A N/A N/A 3.833" Drift 4000 (min) Com letion: 4-1/2", 12.6#, 13Chrome, 80 ksi, VAM To 100% 7500 i 8430 i Ib 3 " ID 4880 max ps ps 288,000 .958 4440 o t 80% 6000 psi 6744 psi 230,400 Ib 3.833" Drift 4000 (min) Completion: 4-1/2", 12.6#, 13Chrome, 95 ksi, VAM To 100% 8410 i 10010 i 42 Ib 3 " ID 5300 max ps ps ,000 3 .958 4820 o t 80% 6728 si 8008 si 273,600 Ib 3.833" Drift 4340 min Formation Integrity Testing: Test Point Depth Shoe Test T pe EMW Pres. Test (Drilling) Pres. Test (Completion) 16" Surface Casin 20' min below shoe FIT 11.5 2500 si N/A 11-3/4" Intermediate CSG 20' min below shoe FIT 12.5 2500 si 4500 si 9-5/8" Drillin Liner #1 20' min below shoe FIT 14.5 2500 si 4500 si 7-5/8" Drillin Liner #2 20' min below shoe FIT 12.0 2500 si 4500 si 4-1/2" Prod. Liner Lap TOL LNR La N/A 2500 psi 4500 psi DIRECTIONAL' KOP: 200 TMD/TVD Build Rates ] °/l00' to 2.75°/100' Maximum Hole Angle: + 71° Close Approach Wells: Surface- l0' well spacing to wells NS-32 and NS-34. All wells passed the major risk rule. G ro will be used for the initial surveys and kickoff. Survey Program: Gyros as required from surface to +/-600'. MWD surveys will be run from 600' to 2500'. IFR+MS corrected MWD surveys from +/- 2500' to TD. SURFACE AND ANTI-COLLISION ISSUES: Note: NS-32 passes Major Risk. Surface Shut-in Wells: See Northstar Anti-Collision and Well Shut-In checklist. 9/18/20062006 Page 6 of 10 • MUD PROGRAM SUMMARY: BP Northstar NS34 Permit Data Surface Hole Mud Properties: Seawater Spud Mud 16" x 21" Hole Section From Surface to 4515' MD / 3173' TVD. Interval MW (pp) FV YP Gel 10 sec API FL pH Initial to base PF 8.8 - 9.3 75 - 200 50 - 70 25 - 40 15 - 20 8.5 - 9.0 Base PF to casin oint 9.0 - 9.3 75 - 200 50 - 70 25 - 40 6 - 10 8.5 - 9.0 Hole O ener: Surface - TD 9.3 max 75 - 200 50 - 70 25 - 40 6 - 10 8.5 - 9.0 Intermediate Hole #1 Mud Properties: Seawater Polvmer Mud 14-3/4" Hole Section From Surface Casing Shoe to T/Colville (16161' MD / 6976' TVD). Interval MW (ppg) FV PV YP API FL pH Initial 9.0-9.3 45-65 8-15 25-30 6-10 8.5-9.5 To of Colville 9.3-9.5 45-65 12-15 25-30 6-10 8.5-9.5 Intermediate Hole #2 Mud Properties: MOBM 10-5/8" Hole Section From Intermediate Casing Shoe to T/Miluveach (23484' MD / 9456' TVD). Interval MW PV YP HTTP FL ES Initial 10.0 15 - 20 17 - 22 6 - 10 6 - 900 To of HRZ 10.0 - 10.3 15 - 20 17 - 22 6 - 8 650 - 900 Liner oint 10.3-10.5 15-20 17-22 4-6 650-900 Intermediate Hole #3 Mud Properties: MOBM 8-1/2" Hole Section From is Intermediate Liner Shoe to 25389' MD / 10932' TVD (top of Sag) Interval MW (p PV YP API FL ES Miluveach & Kin ak 11.0 - 2.5 15 - 20 17 - 22 4-6 / <12 650 - 900 Production Hole Mud Properties: Seawater/KCl/SF Drill-In Fluid 6-3/4" Hole Section From 2" Intermediate Liner Shoe to 25632' MD / 11,136' TVD Interval MW (ppg) PV YP HTTP FL pH Sa River, Shublik, Ivishak 9.2 - 9.3 15 - 20 20 - 30 3 - 5 9.0 - 9.5 Evaluation Program: Surface Hole Section Surface to SV6 -SV5 14-3/4" Pilot Hole to 4515' MD 21" Hole O ener to 4515' MD MWD/GR/Photo-gyro/ IFR/CASANDRA 15 Intermediate Hole Section: SV5 to T/Colville 14-3/4" Hole to 16161' MD MWD/GR/IFR/CASANDRA Mud Lo ers 2" Intermediate Hole Section: T/Colville to T/Miluveach 10-5/8" Hole to 23484' MD Under Ream with Rhino Reamer: 12-1/4" MWD/GR/RES//PWD/IFR/CASANDRA Mud Lo ers 3' Intermediate Hole Section: T/Miluveach to T/Sa River 8-1/2" Hole to 25389' MD Under Ream with Rhino Reamer: 9-1/2" MWD/GR/RES/PWD/ IFR/CASANDRA Mud Lo ers Production Hole Section T/Sa to Ivishak TVD is 20' above O/W Contact 6-3/4" Hole to 25638' MD MWD/GR/RES/PWD/ IFR/CASANDRA Note: N5-33 is a producer with a slotted finer completion. 9/18/20062006 Page 7 of 10 BP Northstar NS34 Permit Data CEMENT CALCULATIONS: PERMAFROST: The 16" surface casing will be run approximately 1597' TVD below the B/Permafrost. The surface casing will be cemented to surface with ASL lead slurry and class `G' tail slurry. This casing string will be cemented using an inner string which should help ensure cement returns to surface. Casing 116" 84# BTC Surface Basis: Lead Volume: Based on 125% excess from surface to B/Permafrost & 50% excess from B/Permafrost to the top of the tail slurry. Tail Volume: Based on 50% excess from TD to 3100' MD + 40' shoe track. Total Cement: 1427 bbl Preflush 50 bbl seawater S acer 100 bbl Mu s II S acer at 10.3 Lead 1022 bbl / sk of 10.7 pp ASL mixed at cf/sk Tail 405 bbl / sk of 15.8 ppg class `G' w/ 0.4% CaCl2 mixed at cf/sk, BHST 65° Casing ~ 11-3/4" 60# 563 Intermediate Basis: Lead Volume: Based on 30% excess from T/SV-2 at 7066' MD to the top of the tail slurry. Tail Volume: Based on 30% excess from TD to 15161' MD + 125' shoe track. Total Cement: 764 bbl Preflush 50 bbl seawater S acer 75 bbl Mud II S acer Lead 667 bbl / sk of 11.5 pp LiteCrete mixed cf/sk Tail 97 bbl / 4 k of 15.8 ppg class `G' mixed a 1. f/sk. BHST = 40° F Liner #1 19-5/8" 47# 513 Drilling Liner Basis: Lead Volume: Based on 12-1 /4" open hole from 16161' to 21484' + 30% excess and 150' of liner lap inside the 11-3/4" casing and 100' of fill above the TOL: 11-3/4" x DP" annulus. Tail Volume: Based on 2000' MD fill + 30% excess and a 125' shoe track. Total Cement: 600 bbt Spacer 100 bbl MudPush II Spacer Lead 522 bbl / 7 sk of 12.5 p LiteCrete mixed at .1 f/sk Tail 78 bbl / sk of 15.8 ppg class G mixed at f/sk. BHST = -10° F Liner #2 ~ 7-5/8" 29.7# 513 Drilling Liner Basis: Slurry Volume: Based on 1886' of 9-1/2" open hole + 30% excess and 150' of liner lap inside the 9-5/8" casin and 100' of fill above the TOL: 9-5/8" x DP annulus and 125' shoe track. Total Cement: 100 bbl S acer 30 bbl Mu sh II S acer at 13.5 Slurry 100 /, 6 sk of 15.8 ppg Premium `G' w/ 35% silica flou 1.5 cf/sk. BHST = 250° F WELL CONTROL: Equipment that is capable of handling the maximum potential surface pressures will be installed. The 16- 3/4" BOP stack will be used to drill the first intermediate hole. A 16-3/4" BOP schematic is attached. 16-3/4" BOP Stack: • 5000 psi working pressure pipe rams (1) • 5000 psi working pressure Blind rams ~ • 5000 psi working pressure Annular Preventer 9/18/20062006 Page 8 of 10 BP Northstar NS34 Permit Data Maximum Surface Pressure -Full Column of Gas Gradients - sift Maximum Pressures 14-3/4" Intermediate Hole #1 TVD Formation Gas BHP Surface Pressure Ugnu & Schrader Bluff 6256 0.450 0.10 2814 BHP -Gas to Surf = 2188 psi Planned 16-3/4" BOP test pressure: 2500 psi (annular to 2500 psi) 9/18/20062006 Page 9 of 10 BP Northstar NS34 Permit Data The 13-5/8" BOPE will be used while drilling all other hole sections. The 13-5/8" schematic and choke manifold schematic are on file with the AOGCC and MMS. 13-5/8" BOP Stack: • 5000 psi working pressure pipe rams (2) • Blind rams • Annular preventer Based upon the calculations below, the 13-5/8" BOP equipment will be tested to 5000 psi. Maximum Surf ace Pressure -Full Column of Gas 10-5/8" Intermediate Hole #2: TVD Formation Gas BHP Surface Pressure Kuparuk C 9176 0.489 0.10 4490 BHP -Gas to Surf = 3572 psi 8-1/2" Intermediate Hole #3: Sag River 10891 0.463 0.10 5040 BHP -Gas to Surf = 3951 psi 6-3/4" Production Hole: Total Depth 11136 0.458 0.10 5095 BHP -Gas to Surf 39 psi Planned 13-5/8 " BOP test pressure: 5000 psi (annular to 3500 psi) Planned completion fluid: 9.3 ppg Seawater / 6.8 ppg Diesel Northstar Nabors Rig 33E 13-518" 5000 psi BOP Stack ~,,,~ From TlColville to TD Hydril Type `GK' 2$.9'7' °vi~°~`° Pipe Ram 32'40' ad Blind Ram I4~iud Cross 9/18/20062006 Page 10 of 10 lJ DF 1,000' m: o° = N O M C Q. 2,000' r O 16", 84#, HCN-80, BTC Pc = 1910#, Pi = 4330# 3,000' CpIg=17.0", Drift=14.822" ------------------------------------ 4,515' MD MW = 9.3 ppg 4,000' 5,000' 6,000' 11-3/4", 60#, S-95, 563 Pc = 4410#, Pi = 6920# 7,000' CpIg=12.75" Drift=10.625" 16,161' MD MW = 9.3 ppg 8,000' Fo co ch r ~~ N ~ N_ ~ LCD p O C r ~ L 9,000' 9-5/8", 47#, HCL-80, 513 Pc = 7100#, Pi = 6870# Cplg = 9.625" Drift = 8.60" 23,484' MD MW = 10.3 ppg 10,000' 7-5/8", 29.7#, S-95, 513 Pc = 7150#, Pi = 8180# CpIg=7.625", Drift=6.750" 11,000' 25,389' MD MW = 12.5 ppg 4-1/2", 12.6#, 13Chr, 80 ksi T&C, Slotted Liner CpIg=4.892", Drift=3.833" 12,000' 25,638' TMD, VS = 21,806' a~ ~ O ~ - ----------- -- _ ~ ~~ a; ~ v o 0 0 - c r ~ o Q~ O ~ v M NS-33 ERD 5-String Design (P10) Spud Mud -- SV-6 - - -- -- -- -- -- SV-5 LSND KCL Mud __ / Colv ille __ VersaD rill T/ HRZ VersaDrill ' T/Sag Drill-I n Fluid 9 10 11 12 13 14 15 by ~~ ACas(~a , BP EXPLORATION 4Yt~ZStaY ~riClin~ NS-33 ERD Field: Northstar Ivishak ENG: S. Coyner Producer RIG: Nabors 33E Directional Plan: P10 RKB: 56 ft DIR / LWD Mud FORM DEPTH HOLE CASING MUD INFO MWD Weight MD TVD SIZE SPECS PIT INFO INFO 24" Wellhead NONE NONE Drive 16-3/4" 5M 190' 190' N/A Pipe 13-5/8" 5M MWD/GR 8.6 Kick Off Point 200' 200' 125% Excess Gyro as needed Surface Csa Cement Job above the Base Permafrost 1,630' 1,576' 23.0° 16", 84# 1022 bbls, 1277 sx B/Permafrost HCN-60, BTC ASL at 4.49 cf/sx 50% Excess Burst 4330 psi 405 bbls, 1954 sx below the Collapse 1910 psi Class G + CaCl2 B/Permafrost Top of Class G 3,100' 2,677' Inner-String Job IFR/Cas End Build Section 3,494' 2,840' 71.0° Displace +/- 112 bbl Test Csg to 45 ft Shoe Track 2500 psi 65° 9.3 16" Casing 4,515' 3,173' 71.0° 16" 21" Hole Openner SV-5 MWD/GR/RES 9.3 ; `- PWD ; IFR/Cas TOC / SV-2 7,066' 4,006' ; 71.0° Mud Loggers F ~', ~? - ~~ i ~ _ y _ ;-~ 30% Excess 9.3 ~ . '~ Inter. Casino Cement Job 8,095' ~ ~ 11-3/4", 60# 667 bbls, 1371 sx ', ~ LSS, S-95 11.5 ppg LiteCrete Hydril 563 97 bbls, 469 sx Test Csg to 9.3 ~ 71.0° -' Int. Yield 6920 psi 15.8 ppg Class G 2500 psi Collapse 4410 psi Displace = 1807 bbl i ,,, - ~ of MOBM 30% Excess Top of Class G 15,161' 6,650' Top of 9-5/8" Liner 16,011' 6,927' 125 ft Shoe Track 140° 9.3 11-3/4" Casing 16,161' 6,976' 71.0° 143/4" Colville MWD/GR/RES 9.3 DRLG LNR-1 Cement Job PWD 9-5/8", 47# 522 bbls, 1347 sx Top of HRZ 21,624' 8,760' HCL-80, Hydril 513 12.5 ppg LiteCrete Test LNR to Mud Loggers Top of Kuparuk 22,454' 9,031' Int. Yield =6870 psi 78 bbls, 379 sx 2500 psi 10.3 Start Drop Section 22,814' 9,148' 71.0° Collapse=7100 psi 15.8 ppg Class G IFR/Cas Top of 7-5/8" Liner 23,334' 9,405' Displace = 940 bbl 30% Excess Top of Miluveach 23,414' 9,416' 125 ft Shoe Track 210° 10.3 9-5/8" Liner 23,484' 9,456' 10-5/8" 12-1/4" Rhino Reamer Miluveach MWD/GR/RES 12.3 54.2° DRLG LNR-2 Cement Job Test LNR to PWD 12.3 Kingak Shale 24,147' 9,916' 37.6° 7-5/8", 29.7# 100 bbls, 366 sx 2500 psi S-95, 513 15.8 ppg Class G Mud Loggers 12.3 End Drop Section 24,252' 10,000' 35.0° Drift = 6.75° Displace = 617 bbl Int. Yield =8180 psi IFR/Cas Collapse=7150 psi 30% Excess Top of Sag River 25,339' 10,891' 120 ft Shoe Track 250° 12.5 7-5/8" Liner 25,389' 10,932' 35° 8-1/2" 9-1/2" Rhino Reamer T/Sag MWD/GR/RES 9.2 Shublik 25,449' 10,981' ~ ~ Slotted LNR Slotted LNR PWD Swell PK R 4-1/2", 12.6# Blank to T/Ivishak Test TOL to 4500 psi Mud Loggers 9.2 T/Ivishak 25,565' 11,076' 13Chrome, 80 ksi Swell PKR IFR/Cas I I ~ ~ Slotted Slotted to TD 255° 9.3 41/2" Liner 25,638' 11,136' 35° 6-3/4" TD to be above the Oil-Water Contact (10/04/04] NS-33 Well Plan Schematic.xls • by • NS33 Proposed Completion I i i i 16" at 4515' M D i i i i i I I I I i i i i i i 11-3/4" at 16161' MD Schlumberger TRSSV at 1000' MD (95 ksi) 4-1/2", 12.6#, 13Chr, Vam Top, 95 ksi at 4,200' MD Schlumberger GLM at 4000' MD (95 ksi) X Nipple at 4,100' MD (95 ksi) Schlumberger GLM at 7100' MD (80 ksi) X Nipple at 7,200' MD (80 ksi) 4-1/2", 12.6#, 13Chr, Vam Top, 80 ksi at 25,200' MD X Nipple at 13,200' MD (80 ksi) X Nipple at 19,200' MD (80 ksi) 9-5/8" at 23484' M D ~ i i i I I I I I-r-4-1/2", 12.6#, 13Chr, Slotted joints to TD I I I I I ~ I 4-1/2" at 25638' MD 1 _ _ _ _ _I + . i XN Nipple at 25,200' MD (80 ksi) &PBR Seal Assembly I ZXP, FlexLock HGR & 40 h PBR 7-5/8" at 25389' M D I I I I I I 4-1/2", 12.6#, 13Chr, Blank joints to T/Swell PKR I i I I Swell PKR at T/Ivishak: +/- 25565' MD by Schlumberger NS33 (P10b) Proposal Report Date: August 30, 2006 Survey I DLS Computation Method: Minimum Curvature / Lubinskl Client: Field: BP Exploration Alaska Northstar Vertical Section Azimuth: 307.870° O~ Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: Northstar PF /NS33 ~ 0~I1 ' ND Reference Datum: Rotary Table well: NS33 ~OVe TVD Reference Elevation: 56.00 ft relative to MSL Borehole: Plan NS33 ppp Sea Bed 1 Ground Level Elevation: 15.90 ft relative to MSL UWIlAPik: 50029 Magnetic Declination: 24.133° Survey Name /Date: NS33 (P10b) /August 30, 2006 Totat Field Strength: 57667.959 nT Tort 1 AHD 1 DDI 1 ERD ratio: 106.939° / 21807.16 ft 16.730 / 1.958 Magnetic Dip: 81.066° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: 15-Feb-07 Location LatlLong: N 70.49162367, W 148.69334368 Magnetic Declination Model: BGGM 2006 Location Grid NIE YIX: N 6031141.300 ftUS, E 659820.740 ftUS North Reference: True North Grid Convergence Angle: +1.23166855° Total Corr Mag North •> True North: +24.133° Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical NS EW Gravity DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Tool Face ft de d ft h ft ft ft de de 100 ft d 100 ft de 100 ft ftUS ftUS Kit U.UU O.UU 3Ub.UU -bti.UU U.UU U.UU U.UU U.UU --- U.UU U.UU U.UU tiU3ll4L3U liSyifZU./4 N /U.4ylbZ36/ VV l4tl.liy33431itf KOP Bld 0.5/100 200.00 0.00 305.00 144.00 200.00 0.00 0.00 0.00 HS 0.00 0.00 0.00 6031141.30 659820.74 N 70.49162367 W 148,69334368 Bld 1.5/100 300.00 0.50 305.00 244.00 300.00 0.44 0.25 -0.36 HS 0.50 0.50 0.00 6031141.54 659820.38 N 70.49162436 W 148.69334660 Bld 2.5/100 400.00 2.00 305.00 343.97 399.97 2.61 1.50 -2.14 HS 1.50 1.50 0.00 6031142.75 659818.56 N 70.49162778 W 148.69336121 500.00 4.50 305.00 443.80 499.80 8.28 4.75 -6.79 HS 2.50 2.50 0.00 6031145.91 659813.85 N 70.49163666 W 148.69339917 600.00 7.00 305.00 543.29 599.29 18.28 10.50 -14.99 HS 2.50 2.50 0.00 6031151.47 659805.52 N 70.49165236 W 148.69346625 700.00 9.50 305.00 642.25 698.25 32.61 18.73 -26.75 HS 2.50 2.50 0.00 6031159.45 659793.60 N 70.49167484 W 148.69356232 800.00 12.00 305.00 740.49 796.49 51.24 29.43 -42.03 HS 2.50 2.50 0.00 6031169.81 659778.09 N 70.49170406 W 148.69368721 900.00 14.50 305.00 837.82 893.82 74.13 42.57 -60.80 HS 2.50 2.50 0.00 6031182.55 659759.04 N 70.49173997 W 148.69384067 1000.00 17.00 305.00 934.05 990.05 101.24 58.14 -83.03 HS 2.50 2.50 0.00 6031197.64 659736.48 N 70.49178250 W 148.69402242 1100.00 19.50 305.00 1029.02 1085.02 132.51 76.10 -108.68 HS 2.50 2.50 0.00 6031215.04 659710.45 N 70.49183157 W 148.694 0 1200.00 22.00 305.00 1122.52 1178.52 167.89 96.42 -137.70 KS 2.50 2.50 0.00 6031234.73 659681.01 N 70.49188708 W 148.69 End Bld 1220.00 22.50 305.00 1141.03 1197.03 175.46 100.76 -143.91 --- 2.50 2.50 0.00 6031238.94 659674.71 N 70.49189894 W 148.694 Top Perm 1229.70 22.50 305.00 1150.00 1206.00 179.17 102.89 -146.95 --- 0.00 0.00 0.00 6031241.00 659671.62 N 70.49190476 W 148.69454490 Base Perm 1630.18 22.50 305.00 1519.99 1575.99 332.23 190.80 -272.49 --- 0.00 0.00 0.00 6031326.18 659544.23 N 70.49214489 W 148.69557115 Bld 1.5/100 1630.19 22.50 305.00 1520.00 1576.00 332.23 190.80 -272.49 HS 0.00 0.00 0.00 6031326.19 659544.23 N 70.49214490 W 148.69557118 1700.00 23.55 305.00 1584.25 1640.25 359.50 206.46 -294.86 HS 1.50 1.50 0.00 6031341.36 659521.54 N 70.49218768 W 148.69575401 Bld 2.25/100 1730.19 24.00 305.00 1611.88 1667.88 371.66 213.44 -304.83 HS 1.50 1.50 0.00 6031348.12 659511.42 N 70.49220675 W 148.69583551 1800.00 25.57 305.00 1675.25 1731.25 400.88 230.23 -328.80 KS 2.25 2.25 0.00 6031364.39 659487.09 N 70.49225260 W 148.69603148 1900.00 27.82 305.00 1764.59 1820.59 445.75 255.99 -365.60 tiS 2.25 2.25 0.00 6031389.36 659449.75 N 70.49232299 W 148.69633230 2000.00 30.07 305.00 1852.09 1908.09 494.08 283.75 -405.24 HS 2.25 2.25 0.00 603141ti.26 659409.53 N 70.49239881 W 148.69665638 Bld 2.75/100 2030.19 30.75 305.00 1878.13 1934.13 509.35 292.52 -417.76 4.38R 2.25 2.25 0.00 6031424.75 659396.82 N 70.49242276 W 148.69675871 2100.00 32.66 305.27 1937.52 1993.52 545.99 313.63 -447.76 4.15R 2.75 2.74 0.39 6031445.21 659366.38 N 70.49248044 W 148.69700399 WeIlDesign Ver SP 2.1 Bld( doc40x_100) NS33\NS33\Plan NS33\NS33 (P10b) Generated 9/15/2006 1:17 PM Page 1 of 3 Measured Vertical Gravity Comments Inclination Azimuth Sub-Sea TVD rvD NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Tool Face ft de de ft ft ft ft ft de de 100 ft de 1100 ft de 100 ft ftUS ftUS ZZUU.UU 35.41 SUb.61 ZUZU.325 ZU/b.325 bUl.yl 34b.Uy -4`J3.3b 3.i3bK Z./b L./4 U.34 bU3"14/b.btl bby3ZV.lV N /U.4`JLbb`Jll VV 1425.b`J/3/b/U 2300.00 38.15 305.91 2100.46 2156.46 661.74 381.09 -541.93 3.62R 2.75 2.74 0.30 6031510.62 659270.79 N 70.49266470 W 148.69777382 2400.00 40.90 306.18 2177.59 2233.59 725.34 . 418.54 -593.37 3.42R 2.75 2.74 0.27 6031546.96 659218.55 N 70.49276699 W 148.69819442 2500.00 43.64 306.42 2251.58 2307.58 792.57 458.35 -647.58 3.24R 2.75 2.75 0.24 6031585.60 659163.51 N 70.49287576 W 148.69863754 2600.00 46.39 306.63 2322.27 2378.27 863.27 500.45 -704.41 3.09R 2.75 2.75 0.21 6031626.46 659105.79 N 70.49299074 W 148.69910216 2700.00 49.13 306.83 2389.48 2445.48 937.29 544.72 -763.74 2.96R 2.75 2.75 0.20 6031669.44 659045.53 N 70.49311167 W 148.69958721 2800.00 51.88 307.01 2453.08 2509.08 1014.44 591.07 -825.43 2.84R 2.75 2.75 0.18 6031714.45 658982.86 N 70.49323828 W 148.70009156 2900.00 54.63 307.18 2512.90 2568.90 1094.55 639.40 -889.34 2.74R 2.75 2.75 0.17 6031761.39 658917.93 N 70.49337027 W 148.70061407 3000.00 57.37 307.33 2568.81 2624.81 1177.45 689.58 -955.32 2.66R 2.75 2.75 0.16 6031810.13 658850.89 N 70.49350734 W 148.70115353 3100.00 60.12 307.48 2620.69 2676.69 1262.92 741.50 -1023.22 2.58R 2.75 2.75 0.15 6031860.59 658781.89 N 70.49364917 W 148.70170870 3200.00 62.87 307.62 2668.40 2724.40 1350.79 795.05 -1092.89 2.51 R 2.75 2.75 0.14 6031912.62 658711.10 N 70.49379544 W 148.70 3300.00 65.62 307.75 2711.86 2767.86 1440.85 850.11 -1164.15 2.46R 2.75 2.75 0.13 6031966.1 "s 658638.67 2 N 70.49394580 W 148.702 3400.00 68.36 307.88 2750.94 2806.94 1532.88 906.53 -1236.86 2.41 R 2.75 2.75 0.13 6032020.97 658564.77 N 70.49409992 W 148.70345549 3493.77 70.94 307.99 2783.55 2839.55 1620.79 960.58 -1306.20 --- 2.75 2.75 0.12 6032073.51 658494.29 N 70.49424753 W 148.70402242 4092.30 70.94 307.99 2979.00 3035.00 21 B6.51 1308.80 -1752.04 --- 0.00 0.00 0.00 6032412.04 658041.10 N 70.49519857 W 148.70766806 4514.89 70.94 307.99 3117.00 3173.00 2585.93 1554.66 -2066.83 --- 0.00 0.00 0.00 6032651.06 657721.12 N 70.49587000 W 148.71024226 4937.48 70.94 307.99 3255.00 3311.00 2985.35 1800.52 -2381.62 --- 0.00 0.00 0.00 6032890.08 657401.15 N 70.49654141 W 148.71281664 5871.46 70.94 307.99 3560.00 3616.00 3868.13 2343.91 -3077.34 --- 0.00 0.00 0.00 6033418.35 656693.95 N 70.49802517 W 148.71850698 7065.74 70.94 307.99 3950.00 4006.00 4996.93 3038.73 -3966.96 --- 0.00 0.00 0.00 6034093.84 655789.67 N 70.49992218 W 148.72578437 8290.64 70.94 307.99 4350.00 4406.00 6154.68 3751.37 -4879.39 --- 0.00 0.00 0.00 6034786.65 654862.21 N 70.50186754 W 148.73324978 9285.87 70.94 307.99 4675.00 4731.00 7095.34 4330.39 -5620.74 --- 0.00 0.00 0.00 6035349.56 654108.64 N 70.50344791 W 148.73931648 13955.80 70.94 307.99 6200.00 6256.00 11509.24 7047.32 -9099.37 --- 0.00 0.00 0.00 6037990.90 650572.67 N 70.51086082 W 148.76779591 16007.51 70.94 307.99 6870.00 6926.00 13448.47 8240.99 -10627.68 --- 0.00 0.00 0.00 6039151.36 649019.16 N 70.51411624 W 148.78031476 16160.62 70.94 307.99 6920.00 6976.00 13593.19 8330.07 -10741.74 --- 0.00 0.00 0.00 6039237.97 648903.23 N 70.51435914 W 148.78124917 21152.09 70.94 307.99 8550.00 8606.00 18311.00 11234.08 -14459.88 --- 0.00 0.00 0.00 6042061.17 645123.80 N 70.52227529 W 148.81172301 21623.67 70.94 307.99 8704.00 8760.00 18756.73 11508.45 -14811.16 --- 0.00 0.00 0.00 6042327.90 644766.72 N 70.52302293 W 148.81460337 21654.29 70.94 307.99 8714.00 8770.00 18785.67 11526.26 -14833.97 --- 0.00 0.00 0.00 6042345.22 644743.54 N 70.52307148 W 148.81479041 21795.16 70.94 307.99 8760.00 8816.00 18918.81 11608.21 -14938.90 --- 0.00 0.00 0.00 6042424.90 644636.88 N 70.52329479 W 148.81565082 22346.36 70.94 307.99 8940.00 8996.00 19439.80 11928.90 -15349.49 --- 0.00 0.00 0.00 6042736.66 644219.52 N 70.52416858 W 148.8 22453.54 70.94 307.99 8975.00 9031.00 19541.10 11991.26 -15429.33 --- 0.00 0.00 0.00 6042797.28 644138.36 1 N 70.52433848 W 148.81 22814.43 70.94 307.99 9092.85 9148.85 19882.20 12201.22 -15698.16 180.00E 0.00 0.00 0.00 6043001.40 643865.11 N 70.52491053 W 148.8218 1 22900.00 68.80 307.99 9122.30 9178.30 19962.54 12250.67 -15761.47 180.00E 2.50 -2.50 0.00 6043049.48 643800.75 N 70.52504526 W 148.82239650 23000.00 66.30 307.99 9160.48 9216.48 20054.95 12307.56 -15834.31 180.00E 2.50 -2.50 0.00 6043104.78 643726.72 N 70.52520024 W 148.82299383 23100.00 63.80 307.99 9202.66 9258.66 20145.62 12363.36 -15905.76 180.00E 2.50 -2.50 0.00 6043159.03 643654.09 N 70.52535227 W 148.82357984 23200.00 61.30 307.99 9248.75 9304.75 20234.35 12417.98 -15975.69 180.00E 2.50 -2.50 0.00 6043212.13 643583.00 N 70.52550108 W 148.82415341 23300.00 58.80 307.99 9298.67 9354.67 20320.99 12471.31 -16043.97 180.00E 2.50 -2.50 0.00 6043263.98 643513.60 N 70.52564637 W 148.82471345 23400.00 56.30 307.99 9352.32 9408.32 20405.37 12523.25 -16110.47 180.00E 2.50 -2.50 0.00 6043314.47 643446.00 N 70.52578786 W 148.82525888 23413.78 55.96 307.99 9360.00 9416.00 20416.81 12530.29 -16119.49 180.00E 2.50 -2.50 0.00 6043321.32 643436.84 N 70.52580704 W 148.82533282 23483.66 54.21 307.99 9400.00 9456.00 20474.11 12565.56 -16164.65 180.00E 2.50 -2.50 0.00 6043355.61 643390.93 N 70.52590313 W 148.82570323 23500.00 53.80 307.99 9409.60 9465.60 20487.33 12573.70 -16175.06 180.00E 2.50 -2.50 0.00 6043363.52 643380.34 N 70.52592530 W 148.82578868 23600.00 51.30 307.99 9470.40 9526.40 20566.71 12622.56 -16237.63 180.00E 2.50 -2.50 0.00 6043411.02 643316.75 N 70.52605841 W 148.82630183 WeIlDesign Ver SP 2.1 Bld(doc40x_100) NS33\NS33\Plan NS33\NS33 (P10b) Generated 9/15/2006 1:17 PM Page 2 of 3 Measured Vertical GraVlty Comments Inclination Azimuth Subsea TVD TVD NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Tool Face ft de de ft ft ft ft ft de de 1100 ft de 1100 ft de 100 ft ftUS ftUS Z3/VV.VU 4tf.i5U 3u/.aa yD34.t)l `Jb`JU.UI ZVb43.3/ ILOU`J./5 -"IbZ`Jtl.U4 123V.VUL L.bV -L.OU U.UV OV434~O.Oy 043GDOA4 IV /VAL0180y0 VV 140AL0/~/JO 23800.00 46.30 307.99 9602.10 9658.10 20717.15 12715.16 -16356.19 180.00E 2.50 -2.50 0.00 6043501.05 643196.23 N 70.52631067 W 148.82727431 23900.00 43.80 307.99 9672.74 9728.74 20787.92 12758.72 -16411.96 180.00E 2.50 -2.50 0.00 6043543.39 643139.54 N 70.52642933 W 148.82773179 24000.00 41.30 307.99 9746.40 9802.40 20855.53 12800.34 -16465.25 180.00E 2.50 -2.50 0.00 6043583.86 643085.37 N 70.52654272 W 148.82816892 24100.00 38.80 307.99 9822.94 9878.94 20919.88 12839.95 -16515.96 180.00E 2.50 -2.50 0.00 6043622.36 643033.83 N 70.52665060 W 148.82858486 Top Kingak 24147.16 37.62 307.99 9860.00 9916.00 20949.05 12857.90 -16538.95 180.00E 2.50 -2.50 0.00 6043639.81 643010.46 N 70.52669952 W 148.82877345 24200.00 36.30 307.99 9902.22 9958.22 20980.82 12877.46 -16563.99 180.00E 2.50 -2.50 0.00 6043658.83 642985.00 N 70.52675279 W 148.82897883 End Drp 24252.03 35.00 307.99 9944.50 10000.50 21011.14 12896.12 -16587.89 --- 2.50 -2.50 0.00 6043676.97 642960.71 N 70.52680363 W 148.82917487 Fault Crossing 25064.46 35.00 307.99 10610.00 10666.00 21477.13 13182.95 -16955.14 --- 0.00 0.00 0.00 6043955.82 642587.40 N 70.52758494 W 148.83218753 25333.03 35.00 307.99 10830.00 10886.00 21631.18 13277.77 -17076.55 --- 0.00 0.00 0.00 6044048.00 642464.00 N 70.52784322 W 148.83318350 Sag River 25339.13 35.00 307.99 10835.00 10891.00 21634.68 13279.92 -17079.31 --- 0.00 0.00 0.00 6044050.09 642461.19 N 70.52784909 W 148.833 7-5/8" Csg Pt 25389.18 35.00 307.99 10876.00 10932.00 21663.38 13297.60 -17101.94 --- 0.00 .0.00 0.00 6044067.27 642438.19 N 70.52789722 W 148.8333 5 Top Shublik 25449.00 35.00 307.99 10925.00 10981.00 21697.69 13318.71 -17128.98 --- 0.00 0.00 0.00 6044087.80 642410.71 N 70.52795474 W 148.83361358 Top Ivishak 25564.98 35.00 307.99 11020.00 11076.00 21764.21 13359.66 -17181.40 --- 0.00 0.00 0.00 6044127.61 642357.42 N 70.52806626 W 148.83404367 TD / 4-1 /2" Lnr - 25638.22 35.00 307.99 11080.00 11136.00 21806.23 13385.52 -17214.51 --- 0.00 0.00 0.00 6044152.75 642323.76 N 70.52813670 W 148.83431531 Legal Description: Northing (Y) [ftUSJ Eastin g (X) [ftUSJ Surface : 1368 FSL 650 FEL S11 T13N R13E UM 6031141.30 659820.74 4066 FSL 1876 FEL S32 T14N R13E UM 6044048.00 642464.00 BHL : 4174 FSL 2014 FEL S32 T14N R13E UM 6044152.75 642323.76 • WeIlDesign Ver SP 2.1 Bld( doc40x_100) NS33\NS33\Plan NS33\NS33 (P10b) Generated 9/15/2006 1:17 PM Page 3 of 3 by Schlumberger WELL FIELD STRUCTURE NS33 (P10b) Northstar Northstar PF Ma9neln Palameleiv GuMace Lacalnn NAD2) Alaska Stale Planes. Zoen 0a. US Feel M~scellareous MoCel BGGM 2006 D®: BI.065" Dale Febrwry 01, 200] N]02929.646 N°Mmp. 60311e1.30 ftU9 GnE GOnV: •1.2]16605)' Slol N533 NDROI Rotary Table IS6.COflabove MSLI Mag Dec .2<1<9' FS 5]66]a nT W1a8 d1 M03] Easing. 659020.]a XUS 6cale Fact:09999290152 Plan N533IP16bl Srry Date. Au9u;i 30, 2006 0 2500 5000 7500 10000 12500 15000 17500 20000 0 2500 ~ 5000 0 0 N c _N ~ 7500 0 10000 12500 .. ~ RTE .....................:.................................._..................................:..................................:.................................._...................................................................'..................................:.......................... KOP Bltl 0.5/100 81d 1.5/100 , Bld 2.5/100 End Rld op Perm gld 1.5/100 rm Bld~T.25%100 ..... •..•..•..... •..... ..•..•..•..•.. _..•..•. ..•.....•..•..•..•..•..t.....•..............•.....1.....•..•..•.....•..•.. ...._..•........•..•.. ..•.....•..•.......... • .._.. _.. •.. _..•.. Bld 2.75/100 End Crv ............... ......... ........ :.....iC"'Csg Pt................ ...................................~....................................................................~....................................................................i............................................................ .•..•..•.. •..•.._.. •.. ._.. _.._.._.. .. •.. •..•.. •.. •..•..•. ..•..•..•..•.._.._.._..i..•.. •..•..•.. •..•..•..• •..•.._.._....._.._.. ._..... •..•..•.. •..•.. ..•.. _.. _.._.._.._.._. •1.•.. •..•..•..•.. •.. .•..•........•..•.. •.. ..•..•..•..... •.._.._.. .. _.._.._.. _.._.._ U9nu......•..•..•..•..i..•..•..•..•..•.._.._.._ ...•..•..•..•..•..•.. .•..•.. •.....•.._.._.. ........•..•..•.. •..•. •.. _.....•.._.._.._ .~ ...i ..................................1...................................i..................................1.. ...........................j.................................. 'v..................................j..................................j..................................:.......................-.... 11-3/4"Csg ~t ._..•..•.....•.._.._..•.!_.._.._..•.._.._.._..•.._S.•.._.._.._.._.._.. _.. •. _.._..•..•..•.._.._.._...j.. •.._.._.. _.. _..ase ~Jgnu._.._.._ ._.._.._ _ .•.._.._.. •.._..•.._..• .._..•.._..•..•..•.._. _j. _.._.._.._.._.._.._ ..:_.._.._.._.._.._..•.._..•.i•..•..•.._.._..•..•.._.._i._.._..•..•.._.._.._.._..~.._.._.._.._..•..•.._..•..i.._.._.. •.._.. _.. _.. •.._..~.. _.. _.. .._.._.. _.. _.:_.._.._..•.. _.._.._.. _.._ •..•.._.. _.. _.._.._.. •. •1.•.._.._.._.._.. _.._ Top Colville Fault Crossing Fault Crossing Fault Crossing .. .. ..•.. .._ raR,gL10L.._.._.._ .~. .•..•..•.._..•..........i•..•..•..•.....•..•..•..•i.•..•..•..................~................•..•..•..~........•..•.....•.._..•..w.....•...........•..• . .i•..• .Td'p~lttLese HRZ -.. _i. 93 8" Cs ..•..•.._..•.._.._.._.._.._.,•..•..•..•..•..•.._..•..•~.•.._.._.._..•.._.._.._..K.._.._.._..•..•.._.._.._..~.._..•..•..•..•..•..•.._..r.._.._..•..•..•.._.._.._.i_.._..•..•..•..•..•..•. •.?• 'nJ _.._ 1.._..9.. -~•1'op I<upa Ali ~ Top Miluveac ~~ V End Dr ..~.._..•.._..•..•.._.._.._.:_.._.._.._.._.._..•..•.._:._.._.._.._.._.._.._..•..~.._.._.._.._.._.._.._.._..i..•..•..•.._.._.._.._.._..~..•.._.._.._.._.._.._.._.:•..•.._..•..•.._.._.._.._.:_.._.. _.._.._.. _.._..•.. _:.•.._.._. _ _ ....................................................................;.....................rap' Krgax c............. ............. ......................................:...................................: ..................................:..................................:.................................. p. .. .. Fault Crossin Top Ivishak 73/8" Csg Pt TD / 4-1/2" Lnr NS33 (P10b) ...............................t..................................n..................................1................................../..................................p................................../..................................1..................................p.............. 0 • 2500 5000 7500 • 10000 12500 0 2500 5000 7500 10000 12500 15000 17500 20000 Vertical Section (ft) Azim = 307.87°, Scale = 1(in):2500(ft) Origin = 0 N/-S, 0 E!-V by Schlumberger ~" NS33 (P10b) P~ELD Northstar STRUCTURE Northstar PF Mapneuc Panmale~s BuRace LOCaEOn NAD2]AMS'ka State Phnes. Zone 00. U5 Feet MiueAaneous MOEat. BGGM 2(%lfi Gp: 81065' Data. FeMUary 01. 200] N]0 i929 BIS Na~Mng: 60311a1 b8U5 GnC Cenv: X123166655- 91st NS33 TVD Ref Rotary TaEM lSfi.00ft aEOVe MSLI Map Dec ~2G 1x9' FS 5]66]6nT W1i8 x13603] Eas4rp 659820 ]4 M15 Swk Fah'09399290152 Plan N5331P 106 sm Dme Aupuzt 30. 2006 -17500 -15000 -12500 -10000 -7500 -5000 -2500 0 12500 10000 n n Z O A°n 7500 N C O7 N U ~ 5000 v v v 2500 0 NS33 (P10b) TD / 4-1/2" Lnr 75/6" Csg Pt i .. . Fault Crossing ..•••.•.•.• ~-rAa~a~rp 8-5/6" Csg Pt Drp 2.5/100 Fault Crossing Fault Crossing Fault Crossing 11-3/4" Csg Pt ..................... ...............................j.................................. j............................... ...... L ...................... _..................................; ..................................:..................................:............... N ....j ..................................~..................................:..................................:....................... ....j ..................................i..................................j...................................j ....................... Bld 2.75/100 Bld 2.25/100 A 81tl 1.5/100 End Bld em 2snoe 16" Csg Pt Bltl 7.5/100 End Crv KOP Bld 0.5/1 ...~ ..................................j..................................5.................................. ~ ....RTE......... -17500 -15000 -12500 -10000 -7500 «< W Scale = 1(in):2500(ft) E »> -5000 -2500 0 12500 • 10000 7500 5000 2500 0 BP Alaska Anticollision Report I Curopany: BP Armoco c Field: Northstar ~,~'~ Reference Site Northstar PF ~~,I Reference V1'ell: NS33 Reference Wellpath;. Plan NS33 _- _---- NO GLOBAL SCAN: Using user defined selection & scan criteria Interpolation Method: MD Interval: 5.00 ft Depth Range: 40.43 to 25638.22 ft Maximum Radius:10000.00 ft Date: 9/15/2006 'l'ime: 1:3:23:48 Page: 1 Co-ordinate(iVE) Reference: Well: NS33, True North Vertical (TVD) Reference: NS33 plan 56.0 DU: Oracle Reference: Principal Plan & PLANNED PROGRAM Error Model: ISCWSA Ellipse Scan Method: Trav Cylinder North Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath ' Date: 1 011 8/2 0 0 0 Validated: No Version: 10 ', Planned From To Survey Toolcode Tool Name ft ft i 40.43 1000.00 Planned: Plan #10 V5 GYD-GC-SS Gyrodata gyro single shots ', 1000.00 2400.00 Planned: Plan #10 V5 MWD MWD -Standard ', 1000.00 4514.00 Planned: Plan #10 V5 MWD+IFR+MS MWD +IFR + Multi Station 4514.00 16161.00 Planned: Plan #10 V5 MWD+IFR+MS MWD +IFR + Multi Station 16161.00 25389.00 Planned: Plan #10 V5 MWD+IFR+MS MWD +IFR + Multi Station 25389.00 25638.22 Planned: Plan #10 V5 MWD+IFR+MS MWD +IFR + Multi Station ', Casing Points MD -` TVD Diameter Hole Size Name ft ft' in in 4514.89 3173.00 16.000 21.000 16" ', 16160.62 6976.00 11.750 14.750 11-3/4" ', 23483.66 9456.00 9.625 12.250 9 5/8" '.25389.18 10932.00 7.625 9.500 7-5/8" ' 25638.22 11136.00 4.500 6.750 4 1 /2" Summary _ _ - - -- - r __ - _ ---------__ Offset Wel{path.--------> Reference . - Offset Ctr-Ctr No-Go ,allowable - Site Well Wellpath MD MD Distance Area Deviation Warning j ft ft ft ft ft Northstar Island NORTHSTAR1 NORTHSTAR1 V5 25635.20 9710.00 3009.64 263.76 2745.88 Pass: Major Risk ' Northstar Island NORTHSTAR2 NORTHSTAR2 V2 22518.12 10500.00 769.99 553.23 216.76 Pass: Major Risk Northstar Island NORTHSTAR2 NSTAR2P61 V1 22530.49 10440.00 786.50 552.81 233.70 Pass: Major Risk Northstar PF NS05 NS05 V4 379.56 385.00 279.36 6.99 272.37 Pass: Major Risk Northstar PF NS05 NS05PB1 V8 379.56 385.00 279.36 6.99 272.37 Pass: Major Risk Northstar PF NS06 NS06 V35 327.31 330.00 270.97 6.45 264.52 Pass: Major Risk Northstar PF NS07 NS07 V34 139.88 140.00 261.10 3.14 257.96 Pass: Major Risk Northstar PF NS08 NS08 V19 283.89 285.00 249.86 5.45 244.42 Pass: Major Risk Northstar PF NS09 NS09 V15 89.90 90.00 240.45 2.23 238.22 Pass: Major Risk ' Northstar PF NS10 NS10 V17 475.71 485.00 225.78 8.09 217.69 Pass: Major Risk Northstar PF NS11 NS11 V12 502.34 515.00 218.17 8.59 209.57 Pass: Major Risk Northstar PF NS12 NS12 V30 361.60 365.00 205.58 6.51 199.07 Pass: Major Risk ', Northstar PF NS13 NS13 V15 366.53 370.00 203.97 6.88 197.09 Pass: Major Risk ', Northstar PF NS14 NS14 V13 405.98 410.00 188.50 7.74 180.76 Pass: Major Risk ', ', Northstar PF NS14 NS14A V12 405.00 410.00 188.48 7.73 180.76 Pass: Major Risk Northstar PF NS15 NS15 V20 362.35 365.00 181.95 6.94 175.01 Pass: Major Risk Northstar PF NS16 NS16 V40 420.24 425.00 170.16 8.22 161.95 Pass: Major Risk ', Northstar PF NS16 Plan NS16A V8 Plan: PI 420.24 425.00 170.16 8.22 161.95 Pass: Major Risk ', Northstar PF NS17 NS17 V16 386.53 390.00 163.25 6.67 156.59 Pass: Major Risk Northstar PF NS18 NS18 V15 3032.03 3175.00 124.76 71.20 53.56 Pass: Major Risk ', ~~ Northstar PF NS19 NS19 V18 357.37 360.00 138.94 6.83 132.10 Pass: Major Risk ', ', Northstar PF NS20 NS20 V14 3075.24 3290.00 184.81 61.17 123.63 Pass: Major Risk Northstar PF NS20 NS20PB1 V11 3075.24 3290.00 184.81 61.17 123.63 Pass: Major Risk Northstar PF NS21 NS21 V60 3316.38 3450.00 155.84 92.86 62.99 Pass: Major Risk Northstar PF NS22 NS22 V14 59.49 60.00 110.12 1.73 108.38 Pass: Major Risk ', Northstar PF NS23 NS23 V36 1668.28 1715.00 90.22 30.85 59.37 Pass: Major Risk ', Northstar PF NS24 NS24 V16 398.09 400.00 89.59 7.63 81.96 Pass: Major Risk ', Northstar PF NS25 NS25 V4 348.48 350.00 83.32 6.44 76.88 Pass: Major Risk ', Northstar PF NS25 NS25P61 V10 348.48 350.00 83.32 6.44 76.88 Pass: Major Risk Northstar PF NS25 NS25PB2 V4 348.48 350.00 83.32 6.44 76.88 Pass: Major Risk !, Northstar PF NS26 NS26 V24 334.81 335.00 72.01 5.98 66.03 Pass: Major Risk ', Northstar PF NS27 NS27 V30 354.40 355.00 58.93 6.47 52.46 Pass: Major Risk ', Northstar PF NS28 NS28 V8 853.37 860.00 44.13 15.68 28.45 Pass: Major Risk ~ ', Northstar PF NS29 NS29 V23 1103.33 1115.00 37.95 20.01 17.95 Pass: Major Risk ', Northstar PF NS30 NS30 V5 199.71 200.00 32.18 4.13 28.05 Pass: Major Risk Northstar PF NS31 NS31 V15 374.60 375.00 20.58 7.16 13.42 Pass: Major Risk • • BP Alaska Anticollision Report Company: BP Amoco Date: 9(15/2006 Time: 13:23:48 Page: 2 Meld: Northstar Reference Site: Northstar PF Co-ordinate(NE) Reference: Well: N533, True Nor th Iteferenec W"ell: NS33 Vertical (TVD) Reference: NS33 plan 56.0 ii Reference Wellpath : Plan NS33 Dh: Oracle ~ Summan - r <------------------ _. Offset Wellpath ----- - ----------> - Reference- - -- Offset Ctr-Ctr M1o-Go Allo~cahle Site Nell Wellpath MD MD Distance Arca Deviation Warning ft ft ft ft k Northstar PF NS32 NS32 V12 384.79 385.00 8.33 7.38 0.95 Pass: Major Risk ', Northstar PF NS34 NS34 V7 Plan: Plan #12 269.31 270.00 9.65 5.24 4.41 Pass: Major Risk Seal Island SEAL-A-01 SEAL-A-01 V4 969.96 965.00 167.77 19.61 148.15 Pass: Major Risk Seal Island SEAL-A-02 SEAL-A-02 VO 1012.23 1005.00 145.46 21.13 124.34 Pass: Major Risk ~, Seal Island SEAL-A-02 SEAL-A-02A V4 987.89 980.00 146.17 18.92 127.25 Pass: Major Risk ', Seal Island SEAL-A-03 SEAL-A-03 V4 961.09 955.00 149.24 16.62 132.62 Pass: Major Risk Seal Island SEAL-A-04 SEAL-A-04 V4 936.87 925.00 196.95 17.67 179.28 Pass: Major Risk ~ • FieldNorthstar SiteNorthstar PF We11:NS33 WellpathElan NS33 157 150 100 50 0 2 50 100 150 157 0 Travelling Cylinder Azimuth (TFO+AZI) [deg) vs Centre • • Date: October 4, 2006 To: File From: _ Jane Williamson Subject: NS-33 request for waiver of BHP measurement BP requested a waiver of CO 458 Rule 5 that requires an initial reservoir pressure survey be obtained prior to placing any well on regular production or injection. The rule states that the surveys may be "stabilized static pressure measurements at bottom-hole or extrapolated from surface (single phase fluid conditions), pressure fall-off, pressure buildup, multi-rate tests, drill stem tests, and open-hole formation tests". I spoke with BP production engineer Robert Younger about this waiver request. NS-33 will be highly deviated (70 deg inclination by 3500' md) and will be the longest reach well drilled in Alaska. The reservoir datum of 11,100'ss is 10 ss' deeper than the planned TD of 25,638'md. Mr. Younger's slick-line model suggests that the maximum depth reachable will be about 23,000'md (+/- 9300' ss) assuming there are no dog-legs. Mr. Younger believes this to be optimistic, and he is concerned that changing fluid levels in the well could cause serious errors in estimating the BHP to datum. It is premature to grant a waiver of the requirement to obtain a BHP survey. However, the Commission will accept slick-line deployed BHP measurements taken as deep as possible in the well and extrapolated to datum based upon measured pressure gradient. The Commission will not require that asingle-phase gradient exist from the gauge depth to datum. If BP finds upon completion of the well and during the initial slickline run to retrieve the PX plug that the conditions make further slick-line runs too risky, the Commission may reconsider waiver of this BHP requirement at that time. • SONDRA D STEWMAN BP EXPLORATION AK INC "Mastercard Check" PO BOX 196612 MB 7-5 ANCHORAGE, AK 99519-6612 as-sii2sz 1'47 _ J L,, -. DATE ~ ~ l` l~~i ~~j~`" ORDEROOF Ef~:~`~~-1~~~ ~ 1~~' `~~ __~ 1 ~ First National. rtk"Alaska Anchorage, AK 99501 ~"''_ MEMO `: ' ~: 1 2 5 2 0 0 0 6 0 ~: 9 9 14 ~~~ 6 2 2? ~~~ L 5 6 4 ll• 0 ~ 4? • • TRANSMITTAL LETTER CHECKLIST WELL NAIVIE ~.-~~ PTD# ~ ~/ ~~ _~~Development Service Exploratory Stratigraphic Test Non-Conventional Well Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK r ADD-ONS I TEXT FOR APPROVAL LETTER WHAT (OPTIONS) j APPLIES MliLTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits i API number in ~ Permit No. API No. 50- are ~ - - between 60-69) j Production should continue to be reported as a function of the i ~ original API number stated above. PILOT HOLE j In accordance with 20 AAC 25.005(f), all records, data and logs ;' acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (~0- - -_) from records, data and logs acquired for well SPACING ~ The permit is approved subject to full compliance with 20 AAC EXCEPTION ~ 25.05. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH j All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals ~ ; through target zones. Non-Conventional ~ Please note the following special condition of this permit: ~ production or production testing of coal bed methane is not allowed Well ~ for (name of well) until after (Com a~nv Name) has designed and implemented a water well testing program to provide baseline data ~ on water quality and quantity. ~Com~anv Name) must contact the ~ Commission to obtain advance approval of such water well testing ~ Rev: 1 i2Si06 C:`jody\transmittal checklist WELL PERMIT CHECKLIST Field & Pool NORTHSTAR, NORTHSTAR OIL - 590100 _ _ Well Name: NORTHSTAR_UNIT 33 _ _ _ Program DEV Well bore seg I PTD#:2061380 Company BP EXPLORATION-(ALASKA) INC _____ ____ _____ __ __ Initial ClasslType _ _DEV / 1-Oll.__ GeoArea _ __ Unit _ _____ On10ff Shore On _ Annular Disposal i, Administration 1 Permit fee attached _ Yes _ _ 12 -Lease number appropriate.. Yes _ - - 13 Unique well-name and number Yes 4 Well located in a_defined pool Yes I,5 Welllocated proper distance from. drilling unit-boundary- Yes 16 Well located proper dstance_f[om other wells - - Yes ~i7 Sufficient acreage available in drilling unit_ Yes _ ~8 If deviated, is wellbore plat included Yes '9 Operator only affected parfy _ Yes _ _ _ 10 Operator has appropriate bond in force Yes I11 Pe[mii_can be issued without conservation order_ Yes 12 Permit_can be issued without administrative approval Yes Appr Date 13 Can permit be approved before 15-day-wait- - - Yes RPC 101212006 '14 Well located within area and-strata authorized by-Injection Order # (put 10# in comments). (FOr_ NA 15 All wells within 114-mile area of review identified (For service well only) NA ~I16 .Pre-produced injector: duration of pre-production les& than 3 months. (For service well. only) NA_ ' 17 Nonconven, gas conforms to A$31,05,030~,1.A),Q,2.A-D) NA i 18 onductor string-provided Yes _ _ __ -_ ----- --- 24" ~a 190'. En meerin 19 9 g Surface casing protects all known USDWS Yes x,20 -CMT vol. adequate to circulate on conductor_& surf csg Yes - Adequate excess. x!21 CMT vol adequate to tie-in long string to surf csg No- 22 CMT will coyer all known productive horizons Yes _ _ '23 Casing designs adequate for C, T B &-permafrost_ - - Yes 1,24 _Adequat_e Tankage-or reserve pil Yes _ _ _ -Nabors 33E. _ 1125 If a re-drill, has_a_ 10-403 for abandonment. been approved _ NA_ _ New well. ,26 Adequate wellbore separationproposed Yes 127 If diverterrequired, does itmeet-regulations- NA_ l)iyerter waiver granted. X28 Drilling flud,program schematic.& equip list adequate- _ Yes Max MW-12.5 ppg. Appr Date I29 BOPEs,_do they meet regulation Yes - - - - . WGA 10!4/2006 1,30 BOPE press rating appropriate; test to.(put psig in comments)_ Yes Test 16-3l4" to 2500 psi; test 13-518" to 5000 psi. M$P 3981 psi._ ~~31 Choke_manifold compliesw/APIRP-53 (May 84) Yes '32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable - No_ Nat an H2S pad. 34 Mechanical condition of wells within AOR verified. (FOr_service well only) N_A ~35 I -- Permit can be issued w/o hydrogen sulfide measures No, I Geology 36 D_ata_presented on_potential overpressure zones. NA 37 Seismic analysis_ of shallow gas zones.. NA - - Appr Date 38 Seabed condition sun!ey (ifoff-shore) - NA, RPC 101212006 '39 Contact namelphone for weekly_progress reports-[exploratory only] - NA _ _ Geologic Engineering Commissioner: Date: Commissioner: Date mm' ner Date DTs Ib~6'~~ ~~-~~ a,6 • • Well History File APPENDIX Information of detailed nature that is not particutariy germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. S~hlumberger bp :% ~~~~ ~--/~ ~S r ~s2~~ i ~ Page R£'~Oft C~V~:1' UVritte~t Corrim~nts '3 ~r~rrnatic~n Tops Table 4 Pressure Gr~dients ~,: Muc! Pr~ssure ~r~clieri#s ~i`; T~st Paint Summary Tab~~ ' Z; T~st ~c~~r1# Table ~~ ~ ~ ~ ; ~ . N~3~A~~iM~,Head~r~;,~;~~~th `r~~ 1~ ~tunC~O~s~Tc~+~l~tring '~ ~ Hor~~c l.c~acis W~ile fi~sking : `: 1~> Ga+~ge Comparisa~ Tab1~ ° :: ~~ tncli~ametry Tab(~s : : '1 ~3 W~[i F'a#~ F~i+~ts = ~~` ~'c~s,~vs_{~~p~ ~ ~~ t~WC~1116# Pr~u~l'~iD ; :2~ tirn~_vs;~rnd ~4 7CY 1V~Ut~ Befbre vs t~lUt~ Aft~r ~5 ; Pcs{ar~s tnterpr~katiort 26 Written Comments Objective: Schlumberger Compile a StethoScope evaluation report that includes plots of formation pressures versus depth, fluid gradients, a table of test point data, and individual plots of each test draw-down/build-up sequence. Specifically for the NS33A well, determine a probable Oil/Water contact based on fluid pressure gradients. Comments: Run 6 was conducted with the StethoScope 475 tool between 16-Apr-2009 and 17-Apr-2009 in the 5.875" hole, from approximately 25,617 ft to 25,828 ft (Measured Depth). A total of 26 tests were attempted. Of those attempts, data was acquired for 24 tests. Of those 24 tests, 18 were completed with normal results, 3 were 'No Seal', 2 were 'Tight' and 1 was 'Dry'. Overall, the quality of the tests was good - see the comments on specific tests in the Test Point Table. The test quality is graded by color, with Green being the highest (see the table below for grading explanation). Eleven of the normal tests were acquired using the Time Optimized Pretest (TOP) 2-C sequence and the remainder were acquired using the 2-D sequence, as noted in the Test Point Table. The data used to generate this report was the Recorded Mode FPWD475 StethoScope data, processed using PD-Plot software (Vers 7.1.56). TVD depths were calculated using the survey data supplied by the field engineer, in a file named NS33A_Final Survey.txt. The GR, TNPH and RHOB curves shown for correlation were obtained from the ADN survey on Run 6. Formation Pres _ , ~ sure Qualit~ Grading Description ~- - __ Color ! Quality# + Description I Examples ~ . , - _ _ _ ._ -- __ Red ~ 0 through_3 No Formation Pressure _ ~ Tight, Building -- Not Close _ _ To Being Stabilized _ _ -- _ _ _- Yellow 3 throu~h 7 _ Questionable/Fair Formation Pressure _ - _ - - - ___ ~ _ _ , Close To Being Stabilized Green I 8 through 10 i Good Formation Pressure _- _ ___ ~ Build Up Stabilized NS33A 3 Schlumherger Formation Tops Table Formation Tops Table Source :Customer Formation Tops MD (ft) TVD (ft) Sub Sea (ft) Color TSGR 25571.6 10892.6 -10836 ~ 6 5/8 TD 25585.02 10904.6 -10848 _ TS H U 25679.14 10988.6 -10932 TSHD 25790.61 11087.6 -11031 TSAD 25795.13 11091.6 -11035 TZD 25836.9 11128.6 -11072 TZC3 25875.44 11162.6 -11106 TZC2 25928.7 11209.6 -11153 NS33A 4 Schlumberger Pressure Gradients Formation Gradients Formatio Gradient Gauges Gradient Density Gradient Contact Contact Top ft n Error % psi/ft g/cc Caption Depth ft Caption Formation Pressure Lines TZC2, 2.7% AQAP 0.439 1.011 0.439 11163.92 Probable 11076.55 TZC3 (0.426 to psi/ft OiIlWater 0.451 contact psi/ft) @11164 ft TSAD, 7.9% AQAP 0.312 0.721 0.312 11064.66 11064.66 TSHD (0.288 to psi/ft 0.337 ~ I ~ psi/ft) Formation Gradients Base or RI STD psia Comment Contact ft Formation Pressure Lines 11266.71 0.9989 0.5300 ~ 11204.04 0.9976 0.2600 , NS33A 5 Pressure Gradients Mud Column Gradients Formatio n Gradient Gauges Gradient Density Error % si/ft Ib/ al p g Mud After Lines TZC2, 2% AQAP 0.495 9.534 TZC3, (0.485 to TZD 0.505 psi/ft) TZC3, 2.3% AQAP 0.503 9.677 TZD, (0.491 to TSAD, 0.514 TSHD psi/ft) Mud Column Gradients Mud After Lines 2.6700 5.7500 Schlumberger ~ Gradient Top ft Base or RI ' Caption Contact ft 9.534 11151.62 11279.96 0.9855 , ' Ib/gal 9.677 Ib/gal 11078.60 11168.77 0.8609 NS33A g Schlumberger Test Point Summary Table No Seal Tight Test Dry Test Type 2 - C Type 2 - D TOTAL Gauges AQAP 7 4 7 4 0 8 6 4 - ----I NS33A 7 Schlumberger ~ Test Point Table Drawdo FPWD ' Test Test Test Test Formation Last-Rea Drawdow ~ Pressur No. ND MD Subsea Test Type FPWD Qualiry Pressure d ~ Mob e Buildup Mobility Invest. Varianc ' ~ ~ e ft . ft ft psia psia md/cp md/cp psia __ _ _ ' 2 10933.57 25617.45 -10876.97 No Seal bad test,no seal 3.56 __ , _ _ -- - _ , 25 10935.78 : 25619.92 ,-10879.18 No Seal bad test,no seal i 2.57 , i ; _._.. ~ __ ~ _ , _ _- ~ --- -_ - - - - f - --- -~'- _ __ _' ~ 26 ~ 10936.71 , 25620.96 ~ 10880.11 % Tight Test ~ tight test,mud cake ok, high ~ 1814.94 ! i 1.41 ~~ ~ ~ ~ positive slope,not stabilized ~ ~ -- ; _ _ _ _ -- - - - -. . - - - _-~_ __- - _ - ~- 3 10940.73 i 25625.46 '-10884.13 Dry Test d test, mud cake ok ; ositive 2669.09 ' S22 ' slo not stabilized _ ~_ _ _ , _ _ ~Y P ~ ~' - . -- _. _ 4 10942.93 ~! 25627.92 -10886.33 '; Tight Test ', Tight test, mud cake ok, High 4755.91 8.54 10.37 i pasitive slope,not stabilized ' __ ~___.__ _ _--- ~ - ~ - - ~ --~- -<-- __~.~_. _~~ ..__~ 22 ~ 11089.68 ~ 25792.97~ -11033.08 Type 2- C~normal test,mud cake ~5082.01mm 5085.58 14.12 15.1 ! 2.39 I~ ' ok,Medium pressure variance; ' ~ low slope 21 T11097.7 25802.02 -11041.1 Type 2- C norm al test,Small pressure 5083.95 5085.4 ~ 18.07 4.69 1.48 ! variance; low 60s slope ' I~ I _ _ , __ _--- . _ _ , 23 ~ 11108 28 , 25813.96 ~-11051.68 Type 2- C norm al test,Normal pressure 5088.25 5089.1 11.06 I 3.56 1.88 I i I variance; small 60s slope ~_---~ ~ , ~ _ -... _~__ - - ~ 20 11116.29 25823.01 11059.69 , -____ ,_-_.__. ~ Type 2-C normal test,Normal pressure 5090.34 5089.81 5.11 2.65 1.86 ~ ' , I ~ variance; small slo Pe,9ood , ', , stability , -- -- 24 , 11120.68 , 25827.96 -11064.08 Type 2- C normal test,mud cake 50917 5093.24 3.62 2.4 I 2.74 ~ ' ok,Normal pressure variance; ! , negative slope, ~ a _ _ ,_ . ; _ - __ -- _ _ _--...__.~_~__ __._ _.~ _ ;_ _ 19 ~ 11126.9 ~ 25834.97 -11070.3 ~ Type 2- C, normal test,mud cake ok, 5097.49 5097.49 14.74 14.82 ' 1.87 , i , Medium pressure variance; still , building butslight neg. slope at ' , finish. ~ - - - - ; _ ' -~ - ~ -- 18 ; 11140.16 , 25849.95 -11083.56 ~', Type 2- C normal test,possible mud leak, 5158.61 5158.61 0.14 0.12 i 2.6 unstable slope ; -- - ~ -- - ~ __ _ _ . , . -- ~ --__.._ _ ---- _} _ _. 14 ! 11147.27 ~ 25857.98 -11090.67 ', Type 2- C normal test,mud cake ok,Small , 5100.4 5101.21 24.81 8.75 i 1.46 ° ~ i ~ pressure variance; low slope !, , ` { -- - _~~ _ _- --- _ _ _ _ - -- - - ----- - -- -~--_- _;. i 11153.47 25864.99 -11096.87 Type 2- C' normal test,Low 5106.3 5106.3 0.17 0.26 2.01 17 ~ ~~~ ~ mobility,Possible mud ' ' leak,negative 60s slope i - . - - _ _ - - ----- 13 11155.19 25866.94 -11098.59 ~Type 2- C' normal test, Low mobility, 5116.61 5116.61 0.03 0.41 i 1.99 ' Possible super-charging, ; G Negative slope, possible leaky ~ ! ~ ~ ' probe packer ~ I ` ; i v _~. ; ; . - . - -- _ _ _ +--~ -- ' 12 11163.13 25875.93 -11106.53 , Type 2- D Normal test, Low 5155.53 ~ 5155.53 ', 0.13 0.13 , 274 mobility,Possible , super-charging,high 60s slope, -----~---- „ , . not fully stabilized , _ ---- _.. f ~~ j_ 15 11164.04 ~ 25876.96 ~~ 11107.44 ;, No Seal bad test,no seal 6229.76 14.6 ~: ~ ~ r • _._._.. _ ~_ J, ; - . _ ~ _ _ __ _ __ __---- - - -i---- 16 11164.52 ` 25877.51 11107.92 T e 2- C normal test, ssible mud leak, 5109.1 5111.15 4.77 3.14 ~ ~ Yp some instabi~ty on final sbpe 2 ~3 ' ~ -, - -- ------ ~ - __ --- _ _ _ :-- 11 ', 11171.98 25885.96 '-11115.38 ~ Type 2- D normal test,Low 5166.67 ' S166.01 0.26 0.28 2.21 I ~ ~ mobility Possible ~ ~ ' super-charging; high slope,not ~ ~ i i stabilized ~ ; i ~ ~, _~. I ( ! _ _ ! _ _ . ~ ~ NS33A g ' ' Schlumberger Test Point Table ~~~~: ~ ~;; ,: . i+ f ` !,'"~ ~~ ~~~~ ,~ ~ ,~.~ ( F 4. 1 ~ y~3 ~ F,, ~,~,~z'~ f„ ~ ~~ 9 `1~ F;i, ~{ .~rw'+ ' ~ !r~ t6~%"~ry ~ ~ .<,,: v 'a,,:~ ~~ -+~~ . f, ,r;r ~ rl y.,' ~~f~~/"u ~ ~~~ ~,, .:^,t' .~ `~~2;~, a„'„ ~~~',.~~~Yr`~ '~, , ~ r+ ~ ~ f ~ ,y„,;r ~~ ~, YX ~~' ~~,~ ~ ~ ~ ~ S e~"3~r~^~ l~„;, j r ~ ,u'r~ ti' e j[i ~~~~i1~T~~ ~,~ ~ ~ ~ , ~ ~a "~ ~ ~..r fi~: ~ 9f 3'~., ~~,•~~ ~~~~~~ y ~ ~ µk, 1? ~'; ~ ''i. "F~ ~ ~gf ~T3,1~~ ~ ~ ~"~~'~~" ~yX~,,~i~' ~~~1'. ~ y" ~ ~ ',.ti k ~ ~~~~~`~` ;ih D~ ~~~~s f~- ~r ,ns ./'~" ~ .`~ w~ ~ ~ ~~;~ C ~' ~ ~ 1~z+ ,, ~. f µ' a~„ ~~ x ~~ x a ~ *~P~ ,~.-^;3 r, . " e ~~r ~~~~ u.~ j M~}~~`~' ~ ~~~y~~~r '~ ~~/ ~ ~ ' ~~ ~ ~ `~~ ..~, ~v"`~k rv ,.~k~r"''; t~ .~` ~ fi ~~ ~~; ~;~~6 ~ ~ ~ f . ~~~ L ~"' 1~ x~~ ' ~~~~ b , ~ y ~ f , ~ .~.~~3' ezkfr ~~++ Y, ", W ,~%' ~ ~ ~~~~ ~"v ~~ , ~'~~3 v. i ~•~~r~ ~ 1~~ ~`.b~~,~~.e-~3'~` ?~ ~ ' o, ~~~;~ ur' ~ s~~, ~'"~fl ~~"' ~^ ~ ` ~~zi' ~Y~~ ~ f s, n .., '" :a.W? `Q ~ ~ f'rc3 ~ ."=w S ,:,s;'1 r' 4` ` ; Y~: '` L ~ n,M, h ~ , "xi .fr ~ -vf u x ~HNSt ' ~ F r " ."',~,r ~f„ i ~ ~ ~ .l' ~ l"r~~i y5' ' ~ ~' "y S ~ / ~.k"",~°' ~~ ~ „P ~ [ ~ , avK ~'Y ~' 3 '" ~z~~ ~ '~"„"" G 4 d ~ ,~ e 0. F,r'~ r' ~ ~"~ GX ~~~ B S~w ~ ~ ~ h ~ ,as£~ ~ .T. "~ S " g t3' ~ ,f f <,~ ~ ~w`f'w~ ~, ~ t z',~ ,a~y 3 '~ „ ~ Yi x . .s ,~ ' ~~'i / ~ .v ,. ~~~~.~ ' „ , v x,,,, r, ~Yl~,r~ "~s ~ M'i '~j ~ '"~ ,ry,, .. < .. ,.. 4~y~~ ~' '" ,~o. ,,,,e , .~ p~5k ~ ~ -:s' ~ '~ , a, ,p.' , ~~ ~ e'~y!.~~, ~ ~~ ~~ ,.. S,.e.,~, / ., ~F~'7~4~.1il~~~ ~ ~ ~' % ~..,~„ ~ ~ ,$, f ~ r ,f i ,/ ~ ~~`"~~~~ ~ `~H~ 1 `~~ ~5 ~ ~ F , ,N„~i,.. ~ f ~H : '" ~ ~ r, ~~5 }~~ '``~R 4 ~ ^~, 7%^ `'3 '«~ ~ ~ ~ E ^~ 3~v" ~, y~n~ "^ ~" G , 4~ ~ 1~~~~~,1 ~;% f / ~ ~~' G`` ," '' x ~ ~ / `X~ j~ ~ ~, ~~ " ~ ? ~` ' ~k~ .~ ~ ~ t~ ~ A' S ~~~ € ~~' r~ ~ ~"~ ~;;- ~' ~° ' y,p.'+ . t ~ ~, ~°a3";/r',;J `~ ` "''~ ~ ~ a" ~ vN~, ~ f ~~ 3~;`"%~ * ~~ f ~ `` `~~`~ 6 2 ~ ~~~ '° ~~~~; < ~ . , . ,,.. , , , ,; , ~ ,,,~„ ,,.. r, /~. ; , e, .~,„„, ,.,., e „. ,a .. v,.r~ ,. ;, .a „<z ~,:.e- . , I ,.,:, ; ,; ,, < r., ~,, ~;.,,, „ „ ,~< ,L3~,r b:~ ~ , ; , ~,m~ ~.~:r-„ , c, ~. ,..y r -1.05 6033.22 10.599 6034.76 TST475 16-Apr-200 150.84 7.89 8.81 0.9 3.24 ~~~~~~ ~ ~ j Probe 9 0822:13 " `~x ~ ~~, ~ ti ~~~~,~. ~ 2.63 6020.13 10.571 601975 ~ TST475 17-Apr-200 147.87 7.44 6.56 1.13 27.03 ~~~~`- , ~ ~ Probe 9 08:14:43 ~ ~ ~ ~~.: ~ r ~~~ 106.42 6021.95 10.575 602278 TST475 17-Apr-200 146.04 1.79 3.88 0.46 27.53 ~~~` ~ ~ Probe 9 08:49:32 , ~~~~ ~~ 1236.7 6091.64 10.69 6090.39 ~ ; TST475 16-Apr-200 ~ 148.76 0.39 1 0.39 2.76 ~~ ~' 1 ~ ; Probe 9 08:51:08 ~~~ ~" ~ ~ ~ , ~ ~ ~e ~~ 341.64 ~ 6096.3 10.709 ~ 6102.29 ; TST475 16-Apr-200 153.58 0.2 0.56 0.36 5.18 ~ ~ " ~ ~~ ~ ~ Probe 9 11:24:36 ~ ~~ ~ ~ti~'~~, ~~ 0.26 ~ r 6197.46 10.732 6197.15 18.64 TST475 17-Apr-200 148.78 7.57 7.56 1 16.18 ~~ ~,~" ~ ~~ ~ ~ ~ ~ Probe 9 06:23:24 , ~ ~ k ~. ~ ~ ~ ~ ~ R ~~'~" "~ `~~' ~. , a ^J`n" Y~ ~ 0.43 _--------_ 61~ __ _____ _..._. 10.697 ._------ 618179 ` 17.07 .. ~ .... ` TST475 Probe ~ _,.,,,_ ~ _ _, r 17-Apr-200 9 06:04:09 ___.. __ 148.97 w . _ _ ~ 6.09 _.~ __ 6.13 ___ ~ ..._ 0.99 .._ 15.75 ...___-- ~~ ~~ ~~~ ~'~~ i~; ~ ~ 072 6205.24 ' 10.728 6205.44 45.04 16.94 TST475 17-Apr-200 149.12 7.54 7.56 1 15.76 ~~'~ ~ ~ Probe 9 06:44:37 .~~ ~~ , 0.48 6208.68 ~ i 10.725 ~ ° 6208.18 9.99 ~ ; TST475 ( Probe J ` ~ 17-Apr-200 9 05:44:45 ~ 148.96 6.84 ~ 6.88 0.99 14.63 , , , ~ ~~ ~,~~ ;~ ~ ~ ~~~ ~~, r r ~~ ~ ~~~~ ~ m.._.__ -.91 ___ ___ _ 6220.16 ~ _ _ _ ~ _ ._ 10.744 _ _ _,..__ 6221.23 ~ 10,63 - ___._ __ _ TST475 Probe ~ - 17-Apr-200 ~ 9 07:07:25 - - 149.25 ~ - - - 6.23 _-_ .,, 6.25 ______ 1 ___ 15.96 ~~ ~~ ~,~ ~~,~ ~ , ~ _ ; ~ i ~~~ ~~~~ ~ ~-.99 6202.19 10.704 6201.76 1 ~ TST475 17-Apr-200 ' 41 8.82 7.58 7.63 0.99 14.2 ~~ ~ ~ ~ ~ Probe 9 05:26:30 ; ~ . ~~~ ~ ~ ~;, ~ ~ ~ ~ ~~~~r ~ ~ ~~~~ ~~`, -8.18 6209.22 10.705 6210.02 TST475 17-Apr-200 147.08 0.25 1.38 0.18 13.41 ', ~'~~ ~ ~ Probe ~ 9 04:52:19 ~; ~;;~ ~ 0.41 6226.4 10.727 ~ 6226.33 24.33 TST475 17-Apr-200 149.21 7.59 7.63 1 11.49 ~~~~~~~ ~# : ~ ~ ~ Probe 9 03:03:02 ~ ~~P ~~ ~F~ ~ ~~~~~,~r -77 6219.76 10.711 6220.4 ~ TST475 j Probe 17-Apr-200 9 04:33:14 147.59 1.32 4.44 0.3 12.87 ~~~~"~ ~~ ~ ~~~. ~ ~ i ~ ~~~ ~ ~~ ~~z~ ~ ~ ~~` -8. 6233.47 10.733 6234.1 ~ TST475 ~ 17-Apr-200 149.32 0.53 1.19 0.45 10.95 ~~~~, ~ E ~ ~ Probe 9 02:40:06 E ~ ~ ~~ ~ x~q ~`%~~ ~ ° € s i ~ ~ ~ ~a w ~~~ sd ~~. ~ ~~ ~ ~~ 18.41 6188.07 10.648 6189.72 ~ j TST475 P b 17-A r-200 9 02 03 50 149.14 0.41 2.19 0.19 10.21 ~ ~ ~~`'~~ ~ rv" ~~~; ro e : ~ ~ ; ~ { ~ ~`~*f"t'-~~~" e ~~%e~ ` ~ `N " r ~ ~s=, 1p ~ ~ ~~~~~ ~~ 0.89 6232.79 10.72 6231.91 ~ ` TST475 17-Apr-200 148.87 0.53 1.44 0.37 11.73 °~ ~~ ~ ~ ~ ' ~ ' f Probe 9 03:34:35 ~ r t~',~~'~ r 3.75 6231.56 ~ 10.717 6230.4 9.1 j TST475 17-Apr-200 148.4 7.28 F 7.31 1 12.37 ~~'~ ~~~~ a 1 Probe 9 04:14:51 ~ ~~~~~~ ~ ~~~ ~~~25.48 ~ 6198.26 j ~ 10.652 6196.88 0.03 i ; TST475 Probe 17-Apr-200 9 0137:06 149.89 1.59 5.44 0.29 9.63 ~ ~~ ~ ~~~~n~~ ~~ ~'~~~~`~`'~ ~~ ~r~~ ~ ~ ~~ ~ _ ~~~~~. 3 t ~~~~~~ ~~ » .........................» .~ ........,.,__......,..._... _ ..._________...~ . . ......._._.._____.. ._ ' .......,............,_{ ,„...,.,,....,.,,._______,. ______ . _._.____~ _____ _ ___..___.__ .~" k;'~e~~ t/F h F ~`` ~~~~~ 1 NS33A g Schlumberger ~ Test Point Table FPWD ' Last-Rea Drawd Drawdo ow Pressur Test Test No. ND Test MD Test Subsea Test Type FPWD Quality Formation Pressure d n ~ Mob e Buildup Mobilit y ~nvest. Varianc ' e ft ft ft psia psia md/cp md/cp psia 10 11191.39 25907.99 11134.79 - TYPe 2. ~ normal test,mud cake ok,Small 5117.43 5118.3 5.65 5.22 ' 0.93 pressure vanance, small slope ~ ~~ --- -- - -_ ~ , _ ; . _.._. + ---._ ~ _ _ _ __.__. _ ___ _._, _ 9 ~ 11210 71 f 25929.95 ~-11154.11 Type 2- D I normal test mud cake ok,Small , 5126.17 5126.17 13.62 5.88 ~ 0.7 ~ pressure vanance; low slope ~ ____ 8 ~ 11232.62 . _. _ ~ 25954.96 ( ___ __. I-11176.02 _ ..--- Type 2- D __, _ .___ __ _ ~ normal test,mud cake ok,Small i 5134.65 __. _ 5134.62 , __.__.. 5.15 _.._ ___ 8.29 .._ _ _. 0.47 ~~~ ~ ~ ~ a = pressure variance; low slope ' ' ~~ _.._ 7 11257.03 1 ; _ _- 25982.95 _ I -11200.43 ' i T e 2 ' D yp . _ _ _ _ ___--- normal test,mud cake ok,Small Y------ ! 5146.45 5147.21 -j--._ 0.44 - 0.6 - - 2.61 - ; __ ' pressure variance; OK slope I ~ ' ~ , 6 11266.71 25994.08 ~-11210.11 : Type 2- D - . - normal test,mud cake ok,Small - - 5150.47 - - 5150.55 -- - 4.26 ~ 4.34 1.82 , , pressure variance; small slope I ' _ ~ ' , ~ ' i S33A 1 1 1 1 1 1 10 ' ' Schlumberger Test Point Table ~ a SYX~' / t i,~~~ ~", i~+'i~A",~u n,y: 4s~ ar '%' ~ ~F~ J,a, € Y~ ~ , ` .~ h ~,+~; ',^./"~+.G'~ ~, "f 5' w.,~ '~, Y~ `u~y ~:Ya'.v~ q~~,f ~, '~ ~ ~i'. l ~ S~, / s:n cs k~,~ ! .~ k'Y ~-%`"~C `p ' '~ f~~~~ ~ SW kv" l^'.~ '" ~~~.?~kTl zv' / ~ A 5 ~ Y ,a ~'~,~~^~'2 k~~ ' r ~.:~~ ~'~S 5C ~~~~ ~ ` ,~ .%`~#r „^.;"" °`" ~ ~'"' ~ ~ ,~ '~ ~F' '~`' x2"yyt P' 1 t~:b ~' s~~ ;ah~ ~, ~' ~ ~ ~~ f'" ~ -; ~1` "~ ,'~~ 9( f%rti'~~~,~"`3~ *'~"~~ "B.x`~ : k~ }~f~ k~7N"~" y~ . yp;j #ti`7~~ '~; ^L~'~ ~ ~ .i ~`" '~ Rfi" ~'~~ `~~5~' y~ ~„~ ,e h .;~eb ~ .Y~ Y X~~, x g~ f+~/ R r ~., 57~"~~ ,r " ~ „ ~xC ~~ ~~ ~~~~r";~ Y ~ r~ ,~ y ,r. ~~~~ :~ ~Wu,w.;~ ~~i"k ~ N a {~~ 'M~~Sw° ~' ' , y~ ~F~~~j~~~'i 3% . ~ ~ Y ~ v ~ ~ . ~y( Y ~~"+' ve ~ ~ ~~' ~3~~'~"'.:"k f 1 ,~' ~",~~~ 1 ~ f ~ `' ~ ~ h.4 /~ x ~ ' j l~'sg'y!~'"' -'•S a ~ ~ . 4y ti y~~~'`/ f f ` '~i „/ ~~ , f y ` k+~ ~, ~ ~ ~ ~" ~/'~ ~~~ ~ „;~r.~ ~ "~ "'"9' i ~ ~ ~~ ~bv i ~ y~ ~ '~ S y `v ~ Y ~ ` ~ ~~ ~' ~ ~ '~ ~ ~ S~~mr ~-s ~ ~~ ~' /C ~ ~9 i~,~" ~` x ~ ~ '~ a s i '~ ~~"3 e~`~r , 5,~ ' r`m~ ~ ~ '" , ,~ `~ ~ ~~f Y ~ ~ ; ~ ~ ~A ~ ~,. ~ , . -:nv~„n~,~, ,,, ~ ,v~,ys„,,A,a~ , ,.~r „~.-,,. "` ~ , ; a „~„~;~r,z--, ~,~,r~, , ,, -, ,a,:, .~;.,~,.r e Y,,,a~.s~;~-, „ ~, ..,,,,v,-„~,~°la .~,y ,;, E ~~a ~, » i,r~r,r.. ~y~,y~Y S ° ~ h'~ ~,/',' ~~ ~ ?~~ t. ~'~ ; ~~~~2~~ ~ 2 y q < ~ ~~~~, a ~ ~y .~1~~~~ 3 '~= ^~~~~ c ~ 5r'`~~ 5 { i . x x ~ 2 ngz i ~YA,*ry7/~ ~'~~ N ~5~~/~ .~ ~ ,~ ~xr`~~ a ~ 55 '~~ fa~, p, '~~~~ ~r>' ~~~ .~~ ~~~.; ~ ~ "~~A..~~~' ~i Y5 ';'r ,~e'~°r;r w yy ~ ~~ ,~d .. '{ i~Z^,Y Y ~ ~ ~ Pl ; ~ Zn~~ '°'E ~~ e~~ ~Y ° ,~h ~ 5 ~ ~° ~ .i 5 ~ ^~ „ , . , ~ ~ ~ ~ & I~ ~~ ~ ~~~~ ~ .%;' ~ .~'. ~" +°e' ~„; yrv '~" „ ~' 5 h~ S~ 5~ . "C 'y "~ m~y' 4 g'2$~ /" C • ~ . '.rvr„ y %~' .~ . ee,: & ~ ?'~ ~ ~ " ~', ,w' ^ f ?h" r "M' i a/b , i " , e s, ^Z ~ ~ ~ ~ ,- ~ f / , .4 . w. i:"' ~ 0.11 6193.93 10.628 6193.78 15.52 TST475 Probe 17-Apr-200 9 01:11:29 150.51 7.54 7 .56 ~ 1 8.35 ~ ~~ ~ ~~`~~~r ;. 0.04 6210.48 10.638 6210.01 TST475 Probe 17-Apr-200 9 00:44:14 151.85 19.16 19.19 1 7.52 e~ ~`~ ~ ~` ,~~ ~ 0.04 6220.49 10.639 ~ E 6222.76 32.09 5.49 TST475 17-Apr-200 150.88 7.64 7.69 0.99 6.34 ~~~~~~ ~ ; Probe 9 00:02:48 ~ ~~ ~`~~' ~~ :~ ~ ° ~ ~,~ ~, 3.85 6234.39 10.639 6236.4 2.93 TST475 16-Apr-200 151.98 1.01 3.5 0.29 5.32 ~~ ~~`~ ~ ~' Probe 9 23:31:42 ~~ ~~~ ~~ 0.04 6240.62 10.64 6242.06 6.04 TST475 16-Apr-200 153.1 7.49 7.44 1.01 ~ ( 4.59 ~;~~ Probe 9 22 59:45 ~~~; ~~~ ____.. ___ _. __ _ _, _ . _~ _ ___..________,.__. _~..__,_ ---__,._.__. .__ ~ ~ _.__ ~.. ~ E ' NS33A 11 Schlumberger ~ NS33A RM Header steth rot • •. :- . • . • ~ . . I' I' - . -• • . ~ • • ~ ~ ~ 1 . ~ StethoSco e475 r ~ V ~ p ~ ~ Formation Pressure While D rilling ~ °- ~ `~ Recorded Mode Lo u a } c Total depth: 26090 ft o K.B. Top Drive ~ m N ~~ Spud date: 3-Feb-2009 ~ G.L. 15.67 ft `'~ °' °0 ~ ~ -° a c o Runs: 6 To 6 w D. F. 5 5. 9 1 ft o ~ ~~~~ ~ . ~ Permanent datum: Mean Sea Level Elev.: 0 ft z a. X z m ~ Log measured from: Driller Depth 55.91 ft above Perm. datum o ~ Depth reference: Driller's Pi e Tall ~ ~- ~ API serial no. 1369'FSL, 650' FEL Longitude Latitude ~~ J~ U 0-029-23325-01 SEC.11 T13N, R13E, UM W 148.69334368 N 70.49162367 Depth logged: 25567 ft To 26045 ft Mag decl: 22.93 deg. Other services: Date logged: 14-Apr-09 To 19-Apr-09 Mag dip: 81.04 deg. DD, D&I, APWD Bore hole record Casing record Hole size from to Size Densi from to B orehole devia tion record T e LSND 15060 ft 25611 ft 72.36 de . 77.83 de . 15060 ft 24151 ft Flo Pro 25611 ft 26090 ft 26.76 de 32.26 de . 24151 ft 25fi11 ft 26.63 de 30.44 de . 25fi11 ft 26090 ft Mud Info Software record Density Ib/gal 9.7 IDEAL Wis 14_OC_06 Viscosit cP 59 SPM 14 OC 02 Fluid Loss cc/30 mi ~.g StethoSco e 2•1 Sample Source Mud Pit #1 Im ulse 9•0 NS33A ~ 2 ' ' Run006_ToolString ' 1 ' ~OWNHOLE EQUIPMENT Schlumberger aanv~s~or~ ~ 38_8 ~C SN#2273 EC SN#300 Neutron F ~122.6 O~ 4.75 Neutron N ~ensity S ~ 22. ~ 1 19.4 BladeO~ 5.75 ~ensity L y y 9. ~ R-O Port ~' y ~ 6.4 StetF~oScope475 ~ -~ 4.0 ~C SN#AJ55 EC SN#025 ACQG SN#4747 Strain SN#735 Annular 92.8 O~ 4.75 R-O Port '~ 92.2 BladeO~ 5.50 ACQG 8~ .5 Micro Sap 79.7 Probe ~ 78_O 1 M Pulse ~~ _s ~C SN#269 EC SN#288 O~ 4.75 Gamma Ray 5~ _3 SU RVEY 49.3 R-O Port ~~ 47.3 Receiver 44. ~ BIT-1 nsert ~ o_o ~~ S N#5 y 62787 O~ 5.88 ~~ 7 Jets 3xy 5 TFA .51 8 Maximum string diameter 5.88 in. All IengtF~s in Feet ' ' NS33A 13 Hook Loads While Testing Depth PU SO ROT 25684.00 390 181 270 25687.00 407 180 271 25688.00 404 180 272 25692.00 390 181 268 25694.00 390 181 272 25860.00 409 180 280 25869.00 407 180 280 25881.00 407 180 279 25890.00 407 180 285 25895.00 409 180 275 25902.00 407 180 283 25917.00 412 180 283 25925.00 417 180 285 25932.00 413 180 287 25934.00 415 180 286 25943.00 415 180 283 25953.00 415 180 290 25975.00 410 180 285 25997.00 440 190 290 26022.00 440 190 290 26050.00 440 190 291 26061.00 440 190 295 150 25600.00 25650.00 - 25700.00 25750.00 25800.00 ~25850.00 25900 00 25950A0 26000.00 26050.00 26100A0 ~ Test Depth Test Wt. 25684.00 261 25687.00 262 25688.00 263 25692.00 258 25694.00 260 25860.00 268 25869.00 268 25881.00 267 25890.00 270 25895.00 262 25902.00 269 25917.00 266 25925.00 266 25932.00 269 25934.00 267 25943.00 269 25953.00 276 25975.00 268 25997.00 274 26022.00 276 26050.00 277 26061.00 280 Hookload , qbs 200 250 300 350 400 450 BLACK= Test RED= Down GREEN= Rot BLUE= Up 14 ' ' ' , w ' , lJ 1 ' ~ ' ' ' ~ ' , ' Pressure Gauge Comparison Table ' 6033.22' 6034.76` No Seal 6020.13 6019.75 No Seal 6021.95 6022.78 Tight Test ' 6091.64 6090.39 Dry Test 6096.3: 6102.29 Tight Test 5082.01 6197.46' 6197.15 Type 2- C _ _. 5083.95! 6185.35` 6181.79; Type 2- C 5088.25 6205.24 6205.44 Type 2- C 5090.34 6208.68' 6208.18 Type 2- C 5091.7 6220.16 6221.23 Type 2- C 5097.49" 6202.19; 6201.76 Type 2- C 5158.61 6209.22' 6210.02 Type 2- C 5100.4 6226.4 6226.33 Type 2- C _ _; _ _ 5106.3 6219.76 6220.4 Type 2- C 5116.61 6233.47' 6234.1 , Type 2- C 5155.53 6188.OT 618972 Type 2- D 6232J9' 6231.91 No Seal 5109.1 ` 6231.56' 6230.4 Type 2- C 5166.67 6198.26 6196.88 Type 2- D 5117.43 6193.93 6193.78 Type 2- D 5126.17; 6210.48 6210.01 Type 2- D 5134.65 6220.49 6222.76 Type 2- D 5146.45 6234.39 6236.4 Type 2- D 5150.47 6240.62 6242.06; Type 2- D 3auae Specifications s/ f~ ~ ,s ~, ~ ~,v h" ~ x~` ~ w ;„ i~ a .~i ~br 'v`r .~ ~ ,' ~.?" ~ ~~~~~ ~i~ ~ ~~~~r~ ~' ~ ~ ~~ ~ ~ ~"`~` ~ ?~ ~~;` ~ff ~ rf y ~ c ~~ ` ~~'~ ,~ : ~ ~~ ~s "~r "~ r ~ S+ - ~ ~' ~ ~~ 2 ~. ~= ~ ~ ~'~ ~~ `` ~ " ` `~~"~ ~ 3 ~ ~ 2,re.?.' f "; ~d5 l'~ "~ a` r l a' dr"' %N ~ u;~ ."y P ~`i1. * H L+ ,~ ^' ~ es ~ "~, ,%' ,~' i "~` ~a.. y ~ ~ ~`y ~s~ ~ ~' S"~ x ; a .~` "i ~"~ ,-'f~ ~ a ~ ~,. ~rt f'~~ ~,r"'va,~ f~ ~~ ~ ~ ~ ~ ~~" `~,~ • ~~"~~' ~~r^' 1 y'~ ~°` s'g~ ~i'l'~' ~~ `:~ "~' ~ ~ a ~ d ~ ~;`',~ ~~' ru'~~ ~` 4s ~, 5`~~ ,. x `~~'' ~%i r,~ ~, ^ ~. , . ,.~„ s ~ ,`~ ; y,,;.,,;" „~'„v~a', . ~ ¢a, "~";; , s~, , a ~', ~ ~"a~ , ec~,,;, ~u~t~..~c~ '" ~ . . . . ? . . '`~ ~` . AQAP (Quartz) ~ 0- 15000 `+/- 5.0000 +/- 0.5000 0.0400' FPWD ~~~ (~~ ~~ Schlumberge~ ' NS33A 15 Schiumberger ~ Inclinometry Tables NS33A Source :Supplied Survey table ~, MD ! 7VD ~ Devi ~ Azimuth ; North i East ~ Departur Departur ~~3ogl~g ! { i ~ ~ ~ @ ~ ` @ '~E114#1` 1'~/ ; 1 I ~ ~~ ~ I 1 ~ I I /QZIItIU~fl 1 ~ t ~t _ ft _ ~ ~ De ~ ~ De ft ~ -- ft ~yft ~ De '; i A~ 'l1~}Uf ;~; 0.00 0.00 Q.01 18.25 0.29 _ ~' 0.10 ' 0.31 19.03 ~-- - __ _ 49.31 49.31 0 70 18.26 0.58 0 20 0.61 19.03 - - - ----~ 99.31 99.31 ~ 0.62 ~ 18.15 ._ 1.13 0 38 1.19 .. 18.59 _, - - - - 149.31 149.30 0.82 18 87 1 72 0 58 1.82 18.63 ' 0 40 _ 207.31 207.29 1.14 324 05 2.58 0 37 '! 2.61 ' 8.16 0 55 - -- - --- _ , 303.31 303.24 2.81 ~285 74 3.99 2.45 ' 4 68 328.45 1.74 -- - 400.31 400.07 3.96 293 87 5.99 7.81 9.84 307.49 ~ 1.19 - - - - - - 496.31 495.63 _T, 6.90 ~ 08 10.31 15.78 18.85 0.16 3.06 _ _ - ',t 600.31 598.55 ~9 54 i 304 47 18.42 28.24 33.72 303 12 2.54 - - - 696.31 693.07 10 57 ~ 307 34 28.26 41.80 ' 50.46 304 06 1.07 - - 791.31 786.39 ~ 11.04 314.28 39.90 -5524 ' 68.14 305.84 0.49 _ _ 1 ~- - - _ _ _ 888.31 881.16 13.58 313.64 , 54.24 -70.13 ' 88.66 307.72 2.62 -- - ~ 983.31 , 972.92 16.40 I 309.47 ~ 70.47 -88.56 113.18 Y 308.51 2.97 - -- + _ __ _ _ - - 1106.98 ~' 1090.66 ~19.19 '~, 310.74 94.84 -117.44 150.95 , 308.92 2.26 --- - - -_ 1200.18 1178.40 I20.23 307.72 114.69 -141.79 182.37 308.97 1.1~ ' 1296.51 1269.62 ~ 17.22 306.36 133 34 -166.46 213.28 308.70 3.12 1391.45 1360.17 '' 17.76 308.97 150.78 -189.03 ; 241.80 308.58 _' 0.57 I --- -- _ -~ - - - 1488.39 1452.03 19.49 , 308.60 , 170.17 -213.17 ' 272.76 ~ 308.60 1.78 - - - 1583.07 1540 42 22.65 295.86 rt 187.99 -241.94 ' 306.39 ~ 307.85 3.34 - - - - - -- t-- - -- 1678.93 1627.87 ', 25.69 ~00.32 ~~ 206.53 -276.49 345.11 ~ 306.76 3 71 _ _ ---- -- _- - -- - - 1774.49 1713.05 '~ 28.20 _, 303.38 229.42 -313.24 388.27 ~ 306.22 2.63 - - - } ,- -- _ 1870.79 1797.33 ~ 29,67 303.16 254 97 -352.19 ' 434.80 305.90 1.53 1964.49 ~ 1877.87 + 31.78 303.78 281.38 -392.12 482.63 _ 305.66 , 225 -~ - - - -- -_. 2062.37 1960.65 32.73 305.75 311 17 435.02 ~ 534.85 305.58 0.97 2156.68 2039.08 34.74 304.82 341 42 477.78 ' S87.23 305 55 2.13 2252.73 2116.72 ~ 37.38 ~ 304.31 ~ 373 48 524.33 643.75 305.34 3.07 _ 2347.29 2190.37 - 40.28 ~ 303.68 ~ 406.62 ---573.49 703.02 { 305.46 2 75 - - ___ 2443.45 ~ 2262 10 ~ 4323 303.68 442.13 -626.77 767.02 305.20 3.07 - - -~ . _ _ . _ - - - - 2537.42 2329.92 44.38 303.92 478.31 -680.82 832.04 305.09 1.22 ' - - - - __ 2633.65 2397.56 4629 303.90 516.50 -737.62 900.48 j 305.00 ~ 1.98 - -~-- - - - 2728.41 ' 2461.36 , 49.05 ~304.09 555 66 -795.70 ' 970.51 ~ 304.93 2.91 ~ - ~- - -- 2823.98 2522.45 51.49 304.31 596.97 -856.48 1044.00 1304.88 2.55 _ -- - - - - ~_ _~ I _ _ _ _ _ -- i 304.85 3.45 - _ -- -- - 3012.39 2632.06 56.67 ' 305.69 684.51 982.16 1198.96 l 304.87 2.05 -- 3107.09 2682.97 ' 58.29 307.05 731 87 _ -1046.45 1276.99 ~ 304.97 1.71 - - - -- - -- I 3203.63 ' 2732.11 60.50 ; ~307.14 781 98 ~-1112 72 +1360.01 ; 305.10 2.29 ! 3299.19 2778.63 61 24 306.69 832.11 ~-1179.46 ~1443.44 305.20 0.77 - - - - - - ~ -- ~ 3394.67 2823.17 63.15 307.33 882.95 -1246.89 1527.85 I305.30 2.00 i - - - -; - _ - -- -- - - - 3491.94 ' 2865.51 , 65.24 306.99 ' 935.84 -1316.68 1615.38 L 305.40 ' 2.15 - - -~- - 3587.75 2903.61 67.89 307.18 988.85 -1386.80 ' 1703.24 ' 305.49 2.77 ~ - - -- - 3684.81 2938 94 I 69 42 307.17 11043 47 1458.83 1793 60 305 58 1.58 3779.99 _ 2970 41 71 96 ~08.29 i 1098.44 1529.86 1883.36 ', 305 68 2.67 _~ - - - - 3876.20 2999.90 172.34 306.40 1153.99~-1602.66 1974.90 305.76 0.39 ~ - - -- ~ __ ~ ' 3972.58 3029.94 ' 71.34 ' 305.49 1207.75 -1676.80 2066.47 305.76 1.04 ' 4068.44 3061.18 , 70.63 306.64 1261.10 -1750.06 2157.10 I, 305.78 0.74 ' -- _ _ - - 4164.22 ~3093.46 69.97 306.70 ~ 1314.95 -1822.39 1 2247.26 305 81 60 9 . 4259.99 3126.02 ~70 28 305.65 ~ 1368.11 _1895.09 ~, 2337.33 305.83 0.32 - - I 4356.47 3157.64 I 71.46 305 77_ 1421.31 _1969 10 2428.47 305.82 ~ 0.02 ' ~ - ~_ ~ - _ 4418.53 i 3177.38 71 45 306 12 1455.85 _-2016 73 , 2487.31_ t 305.83 ~ 22 4549.15 3217.33 72.93 304.83 1528.01 2118.01 2611.66 i 305.81 _, 1.13 _ ~ _ ~ __ ! 4643.82 _ 3245.45 ~ 72,51 304.53 , 1579.45 ,-2192 34 ' 2702.04 305.77 '~ 0.44 4740.41 { 3274.95 ' 71.93 ' 304.18 ~ 1631.35 I, -2268.28 ~ 2793.99 305.72 0.60_ r4835.88 ~ 3304.87 71 53 303.67 1681.95 -2343.50 2884.61 305.67 0.42 ~ _ _ - - - -- 4931.41 3337.52 -~8.50 ~04.40 ~ 1732.19 ~-2417.89 2974.34 305.62 3.17 NS33A ' u i ' ~ ~ ~ , l~ ~ , ' ' ~ , , ' 16 ' , Schlumberger , Inclinometry Tables 5025.27 I 3373 05 -- - ~- ---- 67.01 -- 303.55 1780.74 ,-2489.93 3061.17 305.57 - 1.59 ~ ~ 5121.75 3408.94 69.31 304.05 1830.56 -2564 34 3150.68 305.52 2.38 - _ - 5215.69 3441.10 - - 70.66 306.15 1881.31 '-2636.55 3238.94 ; 305.51 ~ 1.44 ~ 5312.18 i 5406.74 -- 5502.70 _-- 3472.85 3503.43 3533.68 ~, - 70.92 71.34 , 71.91 306.79 307.96 _ 307.63 --- -- 1935 42 -2709.86 ' 1989.68 i-2781.00 - 2045.49 -2852.96 ~ 3330.04 ' 3419.47 - 3510.47 305.53 - 305.58 _- 305.64 0.27 ! - 0.44 . - 0.59 - 5596.30 - -- 5693.95 - --- ~ 5788.45 - _ 3562.33 ' 72.44 ' 3591.63 72.64 3620.89 i 71.29 ___ 306.94 '~ 307.22 307.01 2099.47 2155.63 -- --- ' 2209.$6 ~ -2923.86 -2998.17 , -3069.82 - -- -- 3599.55 305.68 ' - 3692.66 ' 305.72 -- -- - 3782.50 ' 305.75 ~ -----_. 0.57 - 0.20 1.43 ~ _ ' 5883.31 _ 3652.09 -- --___ 70.30 -- 307.40 2264.02 ~ -3141.17 ' __- 3872.05 _ _ 305.78 1.04 ' 5977.65 - -- - 3684 16 69.95 308.15 2318.37 -3211.30 - 3960.72 ' - _ _- 305.83 -- 0.37 ; -- 6073.89 I 3717.03 70.12 -- 309.43 2375.03 ' -3281.80 4051.05 - 305.89 , -- _ _ 0.18 ~ - 6169.72 _ 6265.05 6359.67 -- -_ _ 3749.49 70.28 --- _ -- - - 3781.63 ~ 70.31 - - - - ----- 3813 28 ' 70 61 ' - - _- 311.10 310.90 ' 311.11 2433.31 2492.19 2550.69 - - -3350.60 -3418.33 - -3485.63 , - - - 4140.96 4230.37 - 4319.22 - 305.99 ' _- 306.09 ' __. 306.20 I _ - - 0.17 0.03 0.32 - 6455.27 I 6549.36 ~ - 3844.85 3875.73 i - 70.83_ 70.85 ' 311.59 311.66 ~ 2610.31 2669.35 3553.37 ' ~ 3619.80 ; -- 4409.10 306.30 4497.60 306.41 - _- 0.23 0.02 - ' 6645.28 --- 3907.16 70.89 312.05 2729.82 -3687.30 '~ 4587.82 306.51 0.04 i 6738.88 , 3938.11 70.49 312.16 __ - -- _ 2789.04 -3752.84 4675.74 - _ 306.62 _ _ __ 0.43 ' _ ~ 6836.66 -- 6931.57 - - --- 7028.27 I 3970.17 4000.31 4030.27 ' - 7123 71.74 , 72.17 ' 312.74 310.90 , 309.22 ' -- -- 2851.39 ' - _ __ 2911.40 - 29 507 7 -3821.00 _ - -3888.07 -3958.43 - 4767.65 - 4857.30 - 4949.09 306.73 - 306,83 306.89 ' _. 0.76 '' _. 0.54 -- _ 0.44 7123.26 4059.93 ' 71.44 307.13 3026.34 -4029 3 7 0 39.30 ~ 5 306,91 0.77 7218.94 7315.44 ~ 4090.68 4122.32 , 71.07 70.65 '~ 306.21 305.64 ~ 3080.45 3133 94 -4102.04 5129.90 ' 306.90 -4175.86 ; 5221.05 306.89 - 0.39 0.44 ~ 7412.13 ' -_ 7508.75 __ 4153.93 _ 4185.52 71.19 __- 70.64 - -- 306.62 307.21 --- 3187.82 -4249.67 -- -- 3242.66 -4322.67 ~ _ 5312.43 306.87 - _ 5403.73 y306.88 , 0.56 _ 0.57 - 7605.24 4216.52 71.88 308.73 - 3298.88 ' - -4394.70 - - 5495.09 - -~ 306.89 ~ -- 1.29 .''' 7700.21 4246.73 71.02 308.49 3355.06 -4465.05 5585.08 306.92 ' _ __ 0.91 _ 7796.71 ---- 4277.19 72.19 i -- -- 308.31 - - - --- 3411.94 -- . -4536.81 5676.62 306.95 1.21 7892.40 4306.47 72.17 ' 305.76 - 3466.80 -- -4609.53 I - 5767.71 --- _ 306.95 i - __ -_ 0.02 - 7989.24 4336.56 71.63 304.37 3519 68 -4684.86 5859.70 306.92 0.56 8085.11 4367.03 71.31 i '~ 304.51 3571 09 -4759.83 i 5950.52 306.88 0.33 8181.85 ~, - _-- I 8278.27 r8375.18 4398.33 ' 4429.86 - ' 4461.46 70.94 70.89 - 71.04 306.30 307.94 309.37 ~ 3624 12 3679.11 _ 3736.33 -4834.44 _ -4907.09 _ -4978.63 6042A2 6133.14 6224.70 306.86 306.86 ! 306.89 0.38 ' _ _, 0.05 _ __ _ 0.15 8472.55 - 4492.91 71.28 ~ 309.82 ~ 3795.06 -5049.64 ~ 6316.75 306.93 0.25 __ 8569.61 8665.84 8762.74 4523.95 ----- ~ 4554.63 4585.63 71.41 ' - 71.41 71.27 { - 309.93 - - , 309.71 ' 309.92 ~ 3854.02 '~ 3912.43 , 3971.21 I _ _ -5120.22 - -5190.27 -5260.79 l 6408.60 - - 6499.69 '', 6591.39 r _ 306.97 307.01 307.05 0.13 0.00 0.14 __~ ~ 8860.05 4616.66 ~ 71.55 310.73 _ _- 4030.90 -5331.10 6683.47 307.09 0.29 , - ' 8956.91 I 4646.99 - 71.95 310.33 4090.68 ' -- -- -5401.02 6775.30 ' 307.14 ~, 0.41 ' 9053.07 - 4676.62 72.16 - 310.11 --- - 4149.75 -5470.87 6866.65 - 307.18 0.22 9151.11 ' 4706.58 -- 72.25 309.92 4209.77 -5542.37 6959.89 - 307.22 j 0.09 -- - ~ 9245.29 __ '~ 4735.42 72.09 , 308.62 - _ 4266.52 _ -5611.77 7049.48 _ 307.25 .17 9342.22 4765.35 71.93 ~ 308.46 4323.96 -5683.88 ' 7141.65 307.26 0.17 9437.78 _ 9534.41 4794.92 72.03 --- 4824.66 72.11 j ' 308.19 307.85 4380.31 - -- . _ 4436.94 -5755.17 -5827.60 _ 7232.50 _ . ' 7324.44 ' 307.28 307.28 0.10 0.08 ~' 9631.30 4855.04 ' 71.35 307.66 4493.27 -5900.34 7416.43 ' 307.29 I 0.78 9726.41 4885.50 71.29 308.51 4548.85 -5971.26 7506.53 ~ -- 307.30 ' _ 0.06 _ 9821.29 , -- 4915.41 71.96 308.44 4604.87 -6041.75 7596.55 - 307.31 0.71 ~ 9916.94 4944.84 7220 308.05 4661.21 -6113.23 7687.55 307.32 0.25 , ~, 10013.42 4974.20 72.37 307.39 , 4717.43 -6185.93 ' 7779.45 Y 307.33 0.18 ' 10108.19 --- ' 10204.90 - ' 5003.08 5032.84 72.15 72.00 ' 305.98 305.86 4771.36 4825.34 -6258.31 ' 1-6332.83 7869.71 i , 7961.70 307.32 307.31 0.23 ' 0.16 _ 10302.70 -- 5063.21 ' 71.82 305.75 _ _ - + ' 4879.73 -6408.22 ~ -- - 8054.63 - - 307.29 ' 0.18 - --_ 10368.89 5083.97 ' 71.61 ' 305.82 4916.48 -6459.21 8117.46 307.28 0.32 . - I 10466.23 - 10560.87 - _- - 5114.97 71.25 ~ 5145.79 70.75 - 305.76 --- 306.78 4970.44 - --_ 5023.37 -6534.05 -6606.20 -T 8209.69 ~ 8299.16 _ 307.26 307.25 ~ _ 0.37 0.53 10657.19 - 5177.72 ' 70.53 _- 307.47 5078.22 -6678 65 8390.03 - 307.25 - 0 23 ' - 10752.86 5209.27 70.95 308.27 5133.66 -6749.95 8480.35 307.25 j 0.44 ~I' NS33A 17 Inclinometry Tables ~848.64 5240 36 ' 71.18 ' 10942.73 _ ~ 5271.24 70.49 ~ 11038.67 5 02.91 70.97 11132.96 5333.00 'i 71 81 i 11230.30 , 5363.03 ' 72.25 - 11323.83 ~~391.77 71.95 11419.78 I 5422.19 _ ' 71.09 --,- - ~ 11513.26 5452.29 71.34 11609.72 5482.83 , 71.74 11703.76 5512.74 71.18 11801.16 5544.25 ' 71.07 -- ~ 95.73 5575.24 70.67 11991.52 5606.98 70.63 12085.84 ~ 5638.93 ' 69.77 , 12173.07 I 5669.30 69.48 12266.94 ~700.98 ~1.06 12361.69 5730.96 i, 72.05 12457.08 5760.34 72.08 - 12553.14 ~789.85 72.13 12647.15 5818.70 ~72.14 ' 12743.17 5847.69 72.71 12837.16 ~ ~5876.05 ~ 72.16 12933.71 I 5905.82 ', 71.93 13028.24 ~934.70 ~2.49 - -- 13124.48 5964.31 7 71.67 13220.90 5994.52 71.81 13318.09 6025.00 ' 71.64 13413.72 6055.11 71.65 13509.92 6085.15 71.97 13609.04 6116.12 71.61 13703.53 6145.95 71.58 13801.31 6176.54 ~ 1.97 13896.69 6206.25 71.73 -- 13999.29 6238.54 ~71.58 14089.17 6266.88 71.66 14186.15 6297.54 71.48 14282.59 6327.97 71.73 14379.34 6358.48 71.51 ' 14475.03 6388.61 71.78 ' 14572.08 ' 6419 05 ~ 71.67 14668 77 6449.27 71.90 14765 95 ~479.43 71.94 14860.86 16509.26 ~71.42 ~ 14958A 1 6540.31 'I 71.31 15037.00-I 6565 63 71.30 15060.00 I 6572 61 T73.36 15117.08 6589.43 72.36 15212.35 6617.89 72.90 15307.8~ 6645.74 ' 73.20 15403.53 6672.65 74.15 15435.53 6681.23 ~ 74.71 15499 34 6697 23 ~ 76.25 ~15534 72 6705.28 ~ 77.45 I15594.35 6718.16 77.60 ' 15688.32 6738.44 77.48 15784.59 6759 94 ' 76.72 ~15878.95 678180 ~6.49 15975.84 ~ 6804.48 76.43 ~ 16070.70 _6826 67 -T 76.51 r16166.53 6848 72 ~ 76.89 , 16261.42 6869.51 77.80 NS33A Schlumberger ~ - ___ _. 308.83 5190.12 -6820 80 ~8570.92 307.27 0.24 , ,_309.50 5246 25 --6889 71 _ 8659.75 ~ 307.29 0.73 ~ _ 309.75 5304 01 6959 46 8750.23 ~ 307.31 t 0.50 31013 5361.38 7027.97 8839.50 307.34 0.89 _ -- - - - - , _309.70 5420.79 -7098.99 8932.00 307.37 0.45 -- - _ - - 307 39 0.32 _ - I 309 96 5535 82 7237.45 91~11~.86 307.41 0.90 ' 309.82 5592.58 ---7305.35 ' 9200.28 307.44 - 0.27 - - - _. __ - - - - - , a 309.71 5651.10 7375.68 ' 9291.69 _' 307.46 0.41 ' ~9 07 5707.68 7444 59 9380 81 307.48 ' 0.60 - _- - - ~ 308 05 5765.13 7516 65 9472.95 307.49 0.11 ' ~ 307 24 5819.70 -7587.40 µ 9562.30 307.49 ~ 0.42 -- - __ -- 307.10 5874.30 -7659.42 ' 9652.67 307.49 0.04 ' 307.40 5928.02 -7730 06 9741_.42 ~ - - -T - -- - - 306.92 5977.41 7795 22 9823.18 307.48 0.91 - _ _ - '~307.48 0.33 306.77 __6030.40 7865.93 9911.54 ~ 307.47 ' 1.04 -~ ' 307.92 6084.92 -7937.38 ' 10001.41 307.48 ~ 1.68 307.69 6140 55 _8009.09 _ 10092.17 307.48 0.03 ~306.81 6195 88 8081.85 10183.58 ', 307.48 0.05 ~ ~ 305.84 6248.88 _-8153.94 ~10273.03 ~ 307.47 ~ 0.01 _' 304.84 , 6301.83 -8228.61 ' 10364.51 307.45 0.59 ' -- -- -- - _ i 304.78 6352.98 8302 18 10454.02 ~7 42 0.59 304.48 6405.18 -8377 76 10545.77 ~07 40 ~0.24 ' ~ 04.47 6456.13 -8451.96 ~ 10635.66 307.37 , 0.59 _ __ _ 304.58 6508.03 -8527.40 ' 10727.12 307.35 ' 0.85 ~ - - - 305.14 6560 36 -8602.54 10818.60 j 307.33 0.15 , ~ 305.57 6613 76 -8677.80 10910.82 { 307.31 0.17 - ---- _ - - 306.02 6666.85 -8751.43 ' 11001.56 307.30 0.01 - - - - 307.04 6721 25 -8824.86 11092.94 307.29 ` 0.33 307.56 ~ 6778.31 8899 76 11187.10 307.29 -, 0.36 ' _ -- _ -~ 308.55 6833.57 8970 36 T11276.75 307.30 0.03 -- - - - _308.74 6891.57 9042.89 ; 11369.59 307.31 0.40 ~ 309.60 T6948.82 -9113.16 11460.18 307.33 0.25 ' 309.86 __ , 7011.06 -9188.06 11557.48 307.35 0.15 , 308.99 7065 23 9253.94 11642.72 307.36 0.09 - . - 11734.70 f 307.37 0.19 ~_ _ T _ __ _ 307.09 7122.87 9325 66 ~ 11826.20 307.38 , 0.26 ' 307.75 7179.42 9397 60 ' 6 7235 19 _+-9470 53 11918.01 307.38 0.23 ~ 1 306.54 7289 60 -9543 26 12008.83 'I 307.37 ~ 0.28 , 306.00 7344.12 -9617 56 , 12100.97 ~07.37 ~11 304.86 7397.36 9692.39 12192.76 307.35 0.24 -y ' 305.35 7450.48 9767.97 12285.07 307.33 0.04 - -- - - - ~3 5.95 _ 7503.00 9841.18 12375.13 ' 307.32 0.55 _ - - - ' 306.13 7557.16 -9915.62 12467.16 I~ 307.31 0.11 305.62 ~ 7601.00 -997625 12541.96 307.30 0 01 _~, - , -- I307.55 ,I7614.07 -9993.84 12563.87 307.30 8.96 t 310.32 _7648.34 -10036.27 12618.3~307.31 1.75 _ _ ~_ _ _ 307.35 0.57 , 314 96 7709.91 10103.13 12~98 84 l' 307.42 i 0.31 ~ 319.60 ' 7776.99 10165.07 `12708.89 - - -- i 323.03 7848.68 j-10222.46 12888.00 307.52 0.99 3_21.89 7873 12 10241.24 12917.78 _ 307 62 2.41 - - 323.24 ~ 7922.17 .+ 10278.7_8 j . 307.55._ 1.75 ' ~ 12977.45 __ ' __ 323.47 7949.81 ~-10299.35 I 13010.61 307.66 3.39 ' - - - -~ ~321.93 7996.12 ~10334.63 13066.85 , 307.73 0.25 ~ _ 320.00 8067 39 10392 41 13156.18 307.82 0.13 j ' 317.36 8137.86 -10454 36 13248.34 ~ 307.90 0.79 ~ ~ _ __ --- - - --1 ~ 316.57 8204.96 -10517.01 13339.00 307.96 0.24 316 33 8273.23 _10581 91 ~3432.17 308.02 0.06 ~ 316.63 8340.11 ~645 41 13523.39 + 308 08 0.08 ~15.69 ~8407.37 -10710.01 13615.73 I1308.13 0.40 ' 315.56 8473.55 -10774.76 113707.5~ 308.18 0.96 18 , ' Schlumberger Inclinometry Tables 16356.90 - ; 6889.95 77.48 314.85 8539.73 -- - -10840.47 13800.10 308.23_ 0.34 __ 16451.73 ', 6910.58 77.39 , 314.52 ' 8604.82 -10906.28 13892.08 308.27 I 0.09 16546.10 - ~6931 40 77.11 314.31 8669 24 --- -10972.02 13983.60 308 31 _ _ ~ 0.30 16641.39 ' 6952.50 77.31 I 314.63 8734.33 -11038.34 14075.99 308.35 - 0.21 16735.47 --- _ _ ---- - . 6973.05 77.45 315.00 8799.04 - ~ ---- -11103.46 14167.21 - 308 40 ~ -- r0.15 I 16830.03 -- '~ 6993.29 77.83 ' 315.80 8864.81 -11168.32 - 14258.90 308.44 ~ 0.40 r 16925.34 --. ___ 7014 22 76.81 315.20 8931 13 -11233.49 14351.18 !~ 308.49 1.07 16964.71 - - -. __. 7023.24 76.69 314.99 8958.27 -11260.54 ~ 14389.24 308.50 0.30 17046.92 -- - T 7042.04 ' 76.87 316.72 - _ 9015.70 _ - 11316.28 '' 14468.62 308.54 --- 0.22 17142.30 7063.56 77.05 ' 317.03 - - ~ 9083.52 i-11379.80 ' 14560.57 308.60 0.19 17238.07 17333A7 7085.06 77.01 317.42 __ . __- 7106.45 76.96 I 317.99 - - 9152.02 I' 9220.49 ~ -11443.18 14652.84 308 65__ _ -11505.47 14744.26 I 308.71 0.04 ~, _- 7 0.05 , 17428.33 7127.88 ' 77.04 318.63 9289.80 -11567.20 ' 14835.78 308.77. 0.08 '', 17523.96 7149 33 77.04 ~ 319 31 9360.10 11628 38 14927.51 308 83 0.00 I - 7 9 ~ ~ _ _ _ _ _ 7 ~ 15019.48 , 308 90 - -- 0.09 -- - -, 17 1 .52 ---- 7191 . 57 - ~ 76.99 320.24 ~ 9499.5 11 46.53 ~ - ii 15107.01 ~ I 308.96 0.04 ; -- ~ _ __ _- j - 15202.24 ~ __-_- __ _ 309.03 0.06 17899.91 - 7234.21 76.82 7 ~319.69 9639.72 -11864.g~ --- 15287.26 309.09 0.12 ' 18000. 70 -- _ -- 7257.26 76. 4 319.65 9714.52 -11928.41 - 15383.72 - 309.16 - 0.08 18095.93 - 7279.33 -- 76.46 318.89 9784.72 -11988.86 15474.93 --- --- _. 309.22 . _ ; 0.29 18190.57 _ - .__ 7301.05 77.01 317.83 ---- - ---- 9853.55 -12050.06 - - 15565.87 309.27 ~ 0.58 ' 18285.72 -- 7322.34 -- - 77.13 317.Q9 9921.88 -12112.76 15657.67 309.32 '~ 0.13 ~', ~ 18381.11 + -- 7343.51 77.22 316.99 9989.95 12176.15 15749.85 309.37 0.09 ~ 18476.25 ; - 7364.60 77.16 - -- - 316.57 10057.56 i 12239.68 15841.85 309.41 , 0.06 i 18570.77 , 7385.64 77.13 _ 315.03 10123.62 -12303.92 15933.43 _ 309.45 0.03 ~F 18666.11 ~ 7406.92 77.07 -- 313.37 _ -- 10188.41 --- --- -12370.54 16026.04 309.47 0.06 ' 18761.97 I 7428.44 76.99 311.55 1 10251.46 -12439.46 16119.32 309.49 0.08 , 18855.87 7449.56 77.01 309.98 10311.20 -12508.75 16210.79 309.50 + 0.02 18948.78 7470.35 77.13 308,47 1 10368.47 -12578.90 16301.35 309.50 0.13 19044.23 - -- - 7491.55 77.21 - 307.05 10425.45 12652.47 16394.36 309.49 ~ ' 0 08 - 19139.27 7512.66 --- - 77.13 305.49 10480.27 -12727.18 16486.88 309.47 0.08 19234.47 7533.84 - - ----- - 77.16 303.98 10533.15 -12803.45 16579.37 309.44 -- - 0.03 19328.59 7554.89 76.99 302.20 10583.24 -12880.31 , 16670.55 i 309.41 0.18 19423.24 7575.97 - 77.28 -- 302.28 10632.46 _ _ -12958.35 , 16762 10 ', 309.37 0.31 _ 19518.28 7596.94 I77.22 301.95 10681.74 13036.87 16854.07 309.33 0.06 19613.60 7617.96 77 30 ~ _ 301.78 10730.82 ---- 13115.83 16946.25 309.29 -- - i 0.08 , -- 8 301._76 10779.45 --- + 17037.82 309 25 -13194.34 ----- 0.19 '~_1980 .41 7658.84 ~ 77.46 . 301.66 ', 10827.26 _ 13271.72 17127.99 309 21 0.02 -~ 7 1 1 I ~ 19992.01 7 0 . 6 77.02 '~301.74 ~ . 10924.85 ' -13429.80 ! 17312.24 ~ 309.13 0.08 20009.24 -- _ _ 7705.02 77.07 301.84 10933.70 '-13444.14 17328.90 ' 309.12 ____ 0.29 - 20104.35 __ 7726.21 77.19 ' 301.71 10982.53 -13522.97 --- 17420.87 _ _ . _ 309.08 ~ ~ 0.13 20199.85 7747.26 ~ - 77.34 301.53 -- ----- 11031.36 - -13602.29 17513.23 - 309.04 I ~- 0.16 20294.84 7768.11 - ', 77.30 -- _ _ ', 301.53 - 11079.83 - -- - '-13681.28 - --- -- 17605.11 309.00 ' 0.04 20390.68 - - -- _ 7789.48 - '~ 76.93 _ j ! 301 75 . 11128.84 ,-13760.82 17697.78 308.96 0.39 20485.42 ~ 7810.97 ; _ 76.85 - _ 301.31 11177.09 ', -13839.47 17789.27 308.93 0.08 20580.38 - - _ 7832.55 -- - - 76.88 __ 301.17 11225.05 ~ -13918.53 - 17880.92 -- 308.89 ~ 0.03 20674.84 7854.09 76.75 301.07 11272.58 -13997.27 17972.05 308.85 0.14 7 0 2 ~ 9 ~ 20864.01 7897.67 76. 2 30 .08 113 ~ -141 55.0 181 54.44 308.87 0.10 20958.41 7919.43 76.63 300.59 11414.55 -14233.89 18245.43 3Q8.73 0.10 21053.99 - - -- 7941.46 76.72 _ . 300.49 11461.81 -14313.99 18337.49 308.69 0.09 ' 21148.77 7963.19 -- - _ 76.76 300.25 ! 11508.45 -14393.59 18428.78 308.64 0.04 ! 21244.09 7984.94 -- 76.87 300.79 ' 11555.58 -14473.53 18520.65 ; 308.60 0.12 21339.09 8006 44 - -- 76.96 301.31 , - 11603.31 ---- - __ -14552.81 ~~ --- 18612.39 308.57 0.09 ___ 21434.34 8027.84 -- 77.08 , 301.99 11652.01 _ 14631 82 ''i 18704.53 308.53 0.13 21530.36 _ 8050.41 - 75.73 - 302.93 11702.10 , -14710.57 I 18797.34 ' 308.50 1.41 21624.62 8074.89 74.16 -- 303.23 11751.78 -_ -14786.83 18887.95 ' 308.48 _ 1.67 21722.22 --- 8102.64 72.81 303.95 11803.55 -14864.78 I 18981.19 308.45 1.38 21816.79 8132.02 70.98 304.70 11854.23 - 14939 01 ' 19070.84 308.43 ~ 1.94 21911.66 8165.03 68.30 305.45 11905.33 _15011.gp T 19159.62 308.42 , _1 2.82 I ' NS33A ~g Inclinometry Tables 22006.38 8202 23 65.44 -- - - - 22101.51 8243.65 62.94 22196.52 ',I8288.37 60.89 22292.03 8336.14 59.09 22387.11 8386.38 57.11 22481.93 8438.88 55.65 --- --- 22576.84 8493.34 54.32 ~-- - - - 22672.38 8549.77 53.28 - _ ' 22767.63 8607.57 ~ 52.00 ~ 22862.07 , 8666.31 t 51.07 - 2 92 55 67 ~ 8725.95 ~ 49.77 23050.39 8788.02 148.34 23145.27 8852.19 46.55 23240.35 8919.19 ~43.82 23335.95 8989.74 41.05 23430.78 9063 02 I ~ 37.73 -- - 23525.64 9139.71 34.36 I23620.63 9218.44 33.69 __ 23715.63 ' 9,i 297.29 34.12 _ _ - 23809.89 9375.42 33.92 23904.36 9454.03 33.45 -- - -- 23999.20 9533.22 33.33 24095.09 ~ 9613.32 i 33.37 24205.85 9706.40 _ I 32.26 24300.69 9786.83 fi 31.74 - 24395.31 9867.07 32.25 _ I~ 24489.34 ' 9946.70 3~ 2458323 10026.54 31.48 24678.69 10108.16 30.99 I4 24773.36 10189.52 30.51 -- 24869. 34 10272.41 30.03 ~962.98 10353.77 29.32 - - - 25058.10 10436.97 28.68 _- - - 25153.48 10520.86 28.14 25248.25 10604.62 ~', 27.64 ~25342.54 i 10688.27 .. ' 27.32 25437.75 10773.05~ 26.82 _ 25512.57 10839.84 26.76 25647.38 10960.34 ~ 26.53 25741.92 11044.47- 27 73 25836.87 11128 57 27.59 r25930.90 1121154 28.62 26036.73 11303.61 30.48 , 26090.00 i 11349.52 30.48 -- 305.07 11955.61 - - -- - 3 4.65 12004.56 -- '~ 304.54 i 12052.15 - 1304.32 ' 12098.91 i 303.34 _ ~ 12143.85 ', 302.75 12186.91 _ _---- ' 302.24 12228.67 ' 302.40 12269.89 302.35 12310.43 -- __ 302.58 12350.12 302.62 12388.99 . _- 304.54 12428.54 305.56 12468.67 -- - - - - - 304.75 12507.51 304 48 T 12544.16 - ~-- -- 304.60 12578.27 T 306.38 ~ 12610.64 - t -- , 308.46 12642.93 307.96 ' 12675.70 I 310.15 ~ 12708.92 311.84 12743.29 311.37 12777.94 310.50 12812.48 310.64 12851.52 _ - 310.57 12884.23 - - - -- 310 49 12916.81 ~309 85 12949.07 -- - 310.20 12980.85 ~_ _ - - 310.26 13012.82 310.35 13044.13 -- 310.38 13075.46 _ I 310.26 13105.46 fi- - - - t - + 309.65 i 13135.07 ' 309.88 13164.10 309.79 ' 13192.50 -- - - - 310.29 13220.49 310.11 13248.45 _ -- - 310.08 13270.17 310.77 , 13309.37 _ - - - - 310.04 13337.31 _ ~ 311.39 ~ 13366.06 318.21 13397.26 323.19 13437.66 323.19 _~13459.29 -- . 151~53.98 19246.59 - i 19 03 23 5 _ _-- -- -15222 18 '' 19415.69 -- 15290.39 19498.20 -15357.44 19578.66 -15423.62 19657.28 -15489.18 19734.62 15554 33 19811.29 15618 27 19886.60 -15680.66 19960.17 -- 15741.43 20031.97 --- -15801.04 20103.27 --- -15858.26 ~ 20173.05 -15913 39 20240.40 15966.47 ~ 20304.78 16016.04 20364.83 T-16061.49 20420.57 ~-16103 71 20473.72 -16145 34 20526.70 ~ --- - -16186.29 20579.42 -16225.84 20631.76 16264 87 20683.85 -16304.69 20736.50 -16350.28 20796.47 -16388.44 r 20846.69 -16426.55 ~ 20896.78 -16464 76 20946.76 T-16502.60 ~ 20996.15 -16540.39 ' 21045.62 -16577 30 21093.98 -16614 17 21142.33 -16649.51 21188.66 f -16684.86 21234.75 -16719.74 21280.11 -16753.78 21324.43 -16787.09 21367.91 -16820.19 T21411.22 -16845.98 T21444.92 _ _ __ -16892.01 21505.33 -16924.84 21548.41 16958.25 {21592.45 16989.60 21636.38 t 17022 58~ 21687.30 ~17038 77 '' 21713.41 Schlumherger ~ - --- - t 308.40 3.02 - -- - _- 308.39 2.63 308.37 2.16 ' -- _ t 308.35. , 1.88 ' 308.34 2.08 ' 308.31 1.54 t 308.29 1.40 ~ 308 27--_ 1 09 . ' -- ~ 308.25 ~ 1 34 { 308.22 0.98 _; 308.20 1.39 _ __ ' 308.19 1.51 308.18 i 1.89 308.17 2.87 308.16.. - +2.90 - ' ._ _ 308.14 3.50 ~ ' ~ 308.14 3.55 --- ~14 0.71 _ 308.14 0.45 ' ---- - 308.14 0.21 , 308.15 I 0.50 l~ 308 15 ~ 0.13 ~ T 308 16 i 0.04 . ,, ' 308.17 1.00 -. - ---- , 308.17 0.55 308.18 0.54 J 308.18 0.24 ~ ' 308.19 . 'i 0.58 ' _ 308.19 ' 0.51 '' ; 308.20 0.51 ~ , - -- ' 308.20 0.50 30821 0.76 308.21 0.67 ' _- ---__ _ 30821 0.57 308.22 0.53 _i 308.22 0.34 - ~I 308 23 0.53 ' 308.23 0.08 ' 308.23 0.17 - - - ' 308.24 1 72 ___ 1 _3_08.24 ' 0.15 ~ 308.26 1.10 _ _ ' 308 29 1.76 ' 308 31 _ 0.00 ' ' ' ~ ' NS33A 20 , Schlumberger Well Path Plots 21713.41 Nortn - South (ft) -21713.41 49.31 TVD (ft) 11349.52 inaN vi~w -21713.41 ~/est - East (ft) 21713.41 Cross Section View -21713.41 Departure (ft) Plane = 308.3 - 128.3DEG) 21713.41 NS33A 21 Schlumberger ~ Pres_vs_Depth_v2 ~ FORMATION (AQAP psia) ,..I~IUD AFfER (AQAP psia) 1:594 ft DRAWDOWN MOBILITY -- T~H= =- U (AQAP md/cp) 4000 6000 6100 6300 rVD vp~ ~ 45 -1 -Dry/Tight Test No Seal 0.01 1000 ROBB (g/c3) 1.95---- 2.9 _1 2 5 5 GR_IMP (gapi) P34H_UNC (ohmm) 0 15 0.01 1000 P16H UNC (ohmm) 0.01 1000 --- 10900 _ , 10950 11000 11050 ~ 2 2 22 11100 - ~ 3 23 ~ 0 0 ~ 19 ^ 924 9.677Ib/gal ~ T'p `f F 18 ^ 18 18 ` .~~ ~4 11150 - ~ ~ ~ 1$2 1 ~ 12 T 4 16 11 1 ~ 1 ~ ~ ~ 10 ^ 1 10 11200 T C ~ 9 9 9.5341b/gal 9 ~ ~ _ ~ ~ 8 8 8 ~ 11250 ~ ~ ~ 7 6 F 11300 NS33A 22 ' ' Schlumberger OWC_11164_Pr_v_TVD NS33A 23 Schlumberger ~ Time vs MD TIME VS DEPTH 16-Apr-2009 08:00:00 1:880 ft FORMATION (AQAP psia) 17-Apr-200912:00:00 MD ~ 5000 5200 -DrylTiqht No Seal- t , 25450 25500 25550 25600 3 4 ~6 \~ 25650 V ~ ~ 1 25700 1 I 25750 F 2 22 ~ . 25800 Y 23 1 2s 24 ~ ~2~ ~ ~ 9 --- li ~ ~~ 25850 ~4~i3 1 516 ~ ~16~12 I 11 ~ ~~ ~ 10 ~ 25900 ~ i0 1 ~ - 9 ~ 9 , a 25950 8 ' 7 ~ 7 6 ~ 6 26000 26050 NS33A 24 ' Schlumberger XY MUD Before vs MUD After 6250.00 Mud Pressure After (psia) 6000.00 ~6 ~~~ ~ ~ ~ ~~ ~~ _ ~~ ~ ~ ~ ~21 { 6000.00 Mud Pressure Before (psia) 6250.00 NS33A 25 Pressure Vs Time Plot : Test #2 Run 6 25617.45 ft(MD) 10933.57 ft(TVD) NS33A Schlumberger es tigat on Final 0 0 0 ~ 0 0 0 ~ 0 0 0 N 0~ 0 0 ~ o 0 0 ~ ~ n N a lL W ~ m a a a ¢ ~ a n " v i a N LL ¢ o ~ a a U ~ ! ~ i ° ~ v i ~I Q O N N ? ~ a w~ a ~ w ~ w ~ ~ ~a ~ w ~ ~n ~n w ~ a ¢ a ¢ w ~ ~ v~i w a O D U a r ~ a ~ fn w W Z Q Z a ~ ~ Q J O Q a ~ ~ W ~ O F d Q N ~ Z a °0 3 ~ Z z ~ o a N LL a lL LL O O M O O O O O O O ~ O OO O O ~ Mud Before Q Drawdown Start Invest. - Mudcake Breakdown 0 Buildup Start Invest ~ End Buildup Invest v Drawdown Start ~ Buildup Start ~ End Buildup ~ Mud After Time (sec) Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FPW D475 No Seal TST475 Probe AQAP psia psia psia 6033.22 psia 6034.76 psia 151.31 DEGF / 150.84 DEGF 0.9 c3/s / 7.89 cc -1.05 psia/m 3.56 psia Quality: bad test,no seal 26 ~ ~ ~ ~ ~ r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Pressure Vs Time Plot : Test #3 Run 6 25625.46 ft(MD) 10940.73 ft(TVD) NS33A Schlumberger Inve ti Final 0 0 O r 0 0 O r i 0 0 N oO 0 O r o 0 O r . _. . _ .. __ _. . _ _ . . . __ _ . . .___ ~ N LL n ° w ~? m a a Q N O n - n a ' ` a ~ a ~j ~ W W Q ~ vll d O N ~ K j ~ ~ W w F a ~ N _ a w a ~ a ~ ~ ~ w ~ ~ a ~ a ~ a ~ ~ rn ~ ~ a O Q Q Q a ~ Z ~ U w Z F O Q . . .. ___- w a ~ ~ w a o a ~ ~ _ ? d ~ Q ~ Z Q a p O y ~ LL Z a a LL I LL _-_ (`~ O O O O OO O 3204 2563.2 m 0-1922.4 a~ 5 v~'i 1281.6 ~ a 640.8 0 ~Q~ 2~~ uetaii rressure riot ~rinai Time (sec) ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest Q Drawdown StaR 0 Buildup Start ~ End Buildup ~ Mud After 170 227 284 341 398 455 Time (sec) Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FPW D475 Dry Test TST475 Probe AQAP psia 848.49 psia 2669.09 psia 6091.75 psia 6088.87 psia 148.15 DEGF / 148.76 DEGF 0.39 c3/s / 0.39 cc 1236.71 psia/m 5.22 psia 27 Pressure Vs Time Plot : Test #4 Run 6 25627.92 ft(MD) 10942.93 ft(TVD) NS33A Schlumberger Inve ti tio Final 0 0 0 O ~ 0 0 0 O r 0 0 0 N oO 0 0 O r o 0 0 O n tp ~ LL I w n ~ ~ ~? a m a - a a Q LL ~' ~ Q i U ~ w Q t~i O O ~ ~ N w ~ N ~ ~ a ~ w ~ a N w ~ w w a a w ~ w ~ a a ~ N a > > w N O v U J ~ j F N Z a 2 j a ~ U W _ Q r U ~ ~ Q __'_' -_-__-__--_-_ w a ~ ~ ~ F- Q ^ ~ C7 ~ ~ W ? d Q ~ O Q o ~ 0 3 z o o N LL z a a L~ I LL ~ M O O O O O O O ~ O OO O O Time (sec) Time (sec) ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest Q Drawdown Start ~ Buildup Start ~ End Buildup ~ Mud After Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest RateNolume 60s Slope (Final) Pressure Variance (Final) FPW D475 Tight Test TST475 Probe AQAP psia 504.34 psia 4755.91 psia 8.538 md/cp 6096.3 psia 6102.29 psia 153.6 DEGF / 153.58 DEGF 0.36 c3ls / 0.2 cc 341.64 psia/m 10.37 psia 28 ~ r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Flow Regime Identification Plot : Test #4 Run 6 25627.92 ft (MD) 10942.93 ft (TVD) (Final) Schlumberger N S~:iA ~ a~ > .~ > .` a~ ~ a~ ~ ~ ~ a~ ~ 29 Delta-Time (sec) Pressure Vs Time Plot : Test #6 Run 6 25994.08 ft(MD) 11266.71 ft(TVD) NS33A Schlumberger Investigation Final 0 0 O r~ 0 0 O ~ 0 0 N oO 0 O n o 0 O r ~ A LL p d W ~? m _ a a a ~ ~ ~ a ° a LL a ~ a U ~ w ~ W ~ d J O N ~ ~ ~ w ~ a _._ _ ~ ~ ~ ~ ~ w ~ a ¢ a < g m w a J O ~ D ~ U W ~ ~ ~ J ~ ¢ a Z Q a ~ W H Z a ~ ~ U J ~ a ~ w a ~ N ~ N a O o Q a ~ w ? ~ a F O ~ ~ Z Z a 3 o 0 3 a ~ ~n a LL LL LL N N O O O O N O 5153.55 5151.55 ~ g5149.55 ~ ~ ~ 5147.55 a~ a` 5145.55 5143.55 288.85 Detail Pressure Plot (Fina 328.39 367.93 Time (sec) 407.46 Time (sec) ~ Mud Before v Drawdown StaR Invest. ~ Buildup Start Invest ~ End Buildup Invest v Drawdown Start ~ Buildup Start ~ End Buildup _ ~ Mud After Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FPWD475 Type2-D TST475 Probe AQAP 5150.47 psia 5149.01 psia 5150.55 psia 4.343 md/cp 4.264 md/cp 6240.62 psia 6242.06 psia 153.02 DEGF / 153.1 DEGF 1.01 c3/s / 7.49 cc 0.04 psia/m 1.82 psia 30 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Flow Regime Identification Plot : Test #6 Run 6 25994.08 ft (MD) 11266.71 ft (TVD) (Final) Schlumberger Spherical Time Function Plot : sooo 'i ~ m > .~ > .` a~ 0 a~ ~ ~ ~ ~ m ~ Last 8uildup Pressure E~Arapolated Pressure Buildup Mobiliry : Spherical Slope : 2.000 Spherical Time, 1/sqrt(sec) 5150.55 psia 5150.47 psia 6.04 md/cp -25.72 31 Delta-Time (sec) Slope on Spherical -0.043 Slope on Radial -0.450 Pressure Vs Time Plot : Test #6 Run 6 25994.08 ft(MD) 11266.71 ft(TVD) NS33A ZQQ Schlumberger ~ Final co eo O C~ 1A ~ ao O N o ° ~ ~oQ eo O (~J N co ~ O l") tn ~ n N a LL W m m a Q a Q u' ~ a ~ a a U ~ O Q fn d O ~ ~ N ~ ~ W j l ~ ~ ~ w W ~ a y a ~ w ~ a ~ a ~ w w ~ N ~ a O D U a ~ ¢ ~ a ~ w a Z Z ¢ ~ -' ~ U a w a a ~ ~ W a ~ o C~ a N ? ~ ~ Q ~ ~ z o a ^ O N ~ LL z a _ Q LL LL -_-__-_-____ -_"- N N O N m N O [") N ~ tn V C') O ~fJ N ~ N OO th N ~ N V l'h ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest v Drawdown Start ~ Buildup Start ~ End Buildup ~ Mud After Time (sec) Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest RateNolume 60s Slope (Final) Pressure Variance (Final) FP W D475 Type 2 - D TST475 Probe AQAP 5150.47 psia 5149.01 psia 5150.55 psia 4.343 md/cp 4.264 md/cp 6240.62 psia 6242.06 psia 153.02 DEGF / 153.1 DEGF 1.01 c3/s / 7.49 cc 0.04 psia/m 1.82 psia 32 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Pressure Vs Time Plot : Test #7 Run 6 25982.95 ft(MD) 11257.03 ft(TVD) NS33A Schlumberger Investigation Final 0 0 O ~ 0 0 O ~ 0 0 N oO 0 O n o 0 O r m ii ~ a ° W ~ m a a ¢ ~ ~ a n M a ~ LL ~ fn d U w W Q , I Q J ~ ~. ~ N w f~ ~ ~ ~ a ~ y W ? r a ~ ~ w ~ ~ w v~i w ~ J a ¢ ~ a Q ~ w ~ W ~ m N w a J O F ~ Z U a Z ~ j ~ a ~ Q U N W a a ~ . J o Q ~ w ~ ~ a o a N 7 w ? a F ° ~ a 0 3 z o i d `° ~` a l~ I I LL N N O O O O ~ O O 5150.21 5148.21 m g5146.21 ~ ~ ~5144.21 ~ a 5142.21 5140.21 363.31 Time (sec) ~ Mud Before v Drawdown Start Invest. 0 Buildup Start Invest ~ End Buildup Invest v Drawdown Start ~ Buildup Start ~ End Buildup ~ Mud After Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FP W D475 Type 2 - D TST475 Probe AQAP 5146.45 psia 5150.18 psia 514721 psia 0.597 md/cp 0.435 md/cp 6235.34 psia 6235.58 psia 151.86 DEGF / 151.98 DEGF 0.29 c3/s / 1.01 cc 3.85 psia/m 2.61 psia 33 391.45 419.59 447.73 475.86 504 Time (sec) Flow Regime Identification Plot : Test #7 Run 6 25982.95 ft(MD) 11257.03 ft (TVD) (Final) Schlumberger Radial Time Function Plot ~ a~ > .~ > .~ 0 a~ ~ ~ ~ ~ a a V C Q: ~ u u a ~ a sooo aoo O 2000 1.8 ~ 0 Radial Time Last Buildup Pressure : 5147.21 psia Exlrapolated Pressure : 5146.45 psia Horiz. Mobility Thickness : 2.93 md.fVCp Radial Slope : -8.68 34 ~ ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Delta-Time (sec) Slope on Spherical ,.oss Slope on Radial 0.029 ~ ~ ~ ~ ~ r ~ ~^r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Pressure Vs Time Plot : Test #7 Run 6 25982.95 ft(MD) 11257.03 ft(TVD) NS33A Schlumberger Final 0 0 0 0 oO o 0 N ~ 0 Y~ N ~ o LL~ N 0 N ~ ~ N lL a d W m N a a ~ a a ~ Q ¢ LL ~ ~ Q ~ w a ~n a J ~ ~ w i N ~ O ~ ~ j a w~ a W W ~ , ~ w vj I ~ a a a ~ ~ - - ~ ¢ Q ~ cn a r J ~ ~ UJ W O Q Q Q a ~ w a Z a ~ J ~ Q w a ~ ~ w a d o ~ c~ d Q ~ J Z a O ~ ~ Z ~ ~ o a ~ N a LL z a LL lL l I N N n N (D r ~fJ (O O ~ ~ (O r ~ (O ' O d' N V N 11~ Q O N V N . 4UU Time (sec) Tool Type ~ Mud Before Test Type Q Drawdown Start Invest. Gauk e 9 ~ Buildup Start Invest Formation Pressure ~ End Buildup Invest Last Read (Invest) Drawdown start 0 Last Read (Final) Drawdown Mobility (Invest) ~ euildup Start Drawdown Mobility (Final) ~ End Buildup Mud Pressure Before ~ Mud After Mud Pressure After Temperature Before/After Pretest RateNolume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - D TST475 Probe AQAP 5146.45 psia 5150.18 psia 5147.21 psia 0.597 md/cp 0.435 md/cp 6235.45 psia 6235.66 psia 151.86 DEGF / 151.98 DEGF 0.29 c3/s / 1.01 cc 3.85 psia/m 2.61 psia 35 Pressure Vs Time Plot : Test #8 Run 6 25954.96 ft(MD) 11232.62 ft(TVD) NS33A Schlumberger Investigation Final 0 0 0 0 0 0 oO 0 o 0 O r O ~ N O r~ O r . .. . . __- ___.. ._ ._ _____ -. . .. .___. . ____ _ . _ -_ _. ~ N ~ I LL Q d W ~ N a a a a N ° Q ? a O a a ~ c i~ Q " O ~ Q U W ~ w N CQ7 O ~ ~ ~ ~ ~ ~ ~ w ~ a a w a ~ ~ ~ ~ ~ ~ w w g ~ ~ - -' ~ a W ~ ~ ~ a O D a U a Z ~ Q ~ a ~ ~ W Z ~ J a W a ~ ~ Q ~ d ~ w Z d U F Q J ~ Z J ~ Q 0 ~ N ~ LL 2 ~ a a LL I LL N N O O O O N O O Detail 5137 62 Pressure Plot Final Time (sec) . ~ ~ Mud Before 13 + - - - _ Q Drawdown Start Invest. 5 5.62 - - ____ - ~ Buildup Start Invest m ~N g5133.62 ~ End Buildup Invest ~ Q Drawdown Start ~ o ~ Buildup Start i5131.62 ~ ~ End Buildup n. 5129.62 _ ~ Mud Aner 5127.62 313.69 342.55 371 .41 400.28 429 .14 Time (sec) Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FP W D475 Type 2 - D TST475 Probe AQAP 5134.65 psia 5134.58 psia 5134.62 psia 8.294 md/cp 5.152 md/cp 6220.49 psia 6222.76 psia 150.8 DEGF / 150.88 DEGF 0.99 c3/s / 7.64 cc 0.04 psia/m 0.47 psia 36 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Flow Regime Identification Plot : Test #8 Run 6 25954.96 ft (MD) 11232.62 ft (TVD) (Final) Schlumberger ~ ~ > .~ > .~ 0 ~ 7 ~ N N a Radial Time Function Plot 37 Spherical Time, 1/sqrt(sec) Last Buildup Pressure : 5134.62 psia Extrapolated Pressure : 5134.91 psia Buildup Mobility : 5.49 md/cp Spherical Slope : -29.31 Delta-Time (sec) Slope on Spherical -0.032 Slope on Radial -0.448 Slope on Sphencal 0.540 Slope on Radial 0.034 Radial Time Last Buildup Pressure : 5134.62 psia Extrapolated Pressure : 5134.65 psia Horiz. Mobility Thickness : 32.088 md.fVCp Radial Slope : -2.73 Pressure Vs Time Plot : Test #8 Run 6 25954.96 ft(MD) 11232.62 ft(TVD) NS33A Schlumberger Final r r o ° nO r v rn v m ~ v rn v rn v ~ o N a ~ v N ~ ~ _ -_.._..-__._ ~ _. ... ...... . .._._.-_ ..... ~ a N d LL W A m a a a a N ~ ¢ a O a a M v i Q LL O ~ Q U ~ ~ w ~ Q tnl N d O ~ ~ W w ~ ~ a K ~ I a a ~ a ~ w ~ w ~ w ~ a a ~ w ~ ~ N ~ a I ' ~ U U ~ ~ ~ I t~n Z a Z ~ a ~ U a H a ~ U ~ W a ~ r `~' Q a ^ ~ d Q ~ ~ w ? U ~ ~ o ~ a I Z z a ~ LL a LL N u. - ---- ~ ~ -- - - - ----- - N N W N W C' OJ M ' OJ M O J M (h I M Cl O N C l MO l") ~ ~ Mud Before v Drawdown Start Invest. ~ Buildup Start Invest ~ End Buildup Invest Q Drawdown Start ~ Buildup Start ~ End Buildup ~ Mud After YVV Time (sec) Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - D TST475 Probe AQAP 5134.65 psia 5134.58 psia 5134.62 psia 8.294 md/cp 5.152 md/cp 6220.49 psia 6222.76 psia 150.8 DEGF / 150.88 DEGF 0.99 c3/s / 7.64 cc 0.04 psia/m 0.47 psia 38 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Pressure Vs Time Plot : Test #9 Run 6 25929.95 ft(MD) 11210.71 ft(TVD) NS33A Schlumberger Investigation Final I 0 0 O r 0 0 O r 0 0 N oO 0 O n o 0 O n ~ p_ N d LL W m m a Q a ~ LL ~ d a n ~ U W ~ a, ~ ~I Q ~ ? ~ ~ ~ a ~ a `n ~ w ~ ~ ~a w ~ v~i ~ a a ¢ ~ ~ r~i~ w a J O ~ Q ~ Q W Q W a F W Z Q Z ~ H ~ U Q ~ a ~ H w Q d ~ ~ d Q ~ J ? Q Q ~ z z 3 ~ ~ ~ ~ a LL a IL N N O O O O ~ O O 5129 5127 m g5125 ~ ~ u,5123 ~ a 5121 5119 100 2~~ ~~ Detail Pressure Plot Final .17 0 .17 .17 .17 17 351.94 381.75 411.56 441.38 471.19 5C Time (sec) Time (sec) ~ Mud Before v Drawdown Start Invest. 0 Buildup Start Invest ~ End Buildup Invest Drawdown Start Buildup Start ~ End Buildup ~ Mud After Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - D TST475 Probe AQAP 5126.17 psia 5127.32 psia 5126.17 psia 5.883 md/cp 13.622 md/cp 6210.48 psia 6210.01 psia 151.91 DEGF / 151.85 DEGF 1 c3/s / 19.16 cc 0.04 psia/m 0.7 psia 39 Flow Regime Identification Plot : Test #9 Run 6 25929.95 ft (MD) 11210.71 ft (TVD) (Final) Schlumberger ~ ~ > .~ > .` ~ 0 ~ ~ ~ ~ ~ ~ ~ Delta-Time (sec) 40 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Pressure Vs Time Plot : Test #9 Run 6 25929.95 ft(MD) 11210.71 ft(TVD) NS33A Schlumberger Final m m o ° mO co ' n N r~ 1(l ~ r lA r U) ~ N ~~(l ~ ~ -- ~ n N ° LL w ~ m a a m ~ n n ~ Q LL w d a ~ ~n Q a J ~ w ~. N ~ N w j (~ ~ ~ ~ a w W ~ ~ d W ~ N w g ~ a a a ~ a w a ~ ~ ~ ~n w K a O ~ ~ W W J ~ U Q J a N ul Z Z Q j H ~ ~ U Q w a Q ~ ~ a p o U' a a ~ J w ? a ~ ~ z z ~ o o a O ~ N ~ a LL a LL LL N O fh N Q V ~!1 CJ N O V O N ~ N C~ N OO V LL) C) N Q V 3 40 3 50 36 0 3 70 3 80 3 90 4 00 41 0 42 0 43 0 44 0 45 0 4 60 4 70 48 0 4 90 5 00 Time (sec) Tool Type ~ Mud Before Test Type v Drawdown Start Invest. Packer Gauge ~ Buildup Start Invest Formation Pressure ~ End Buildup Invest Last Read (Invest) Drawdown Start ~ Last Read (Final) ~ Drawdown Mobility (Invest) Buildup Start Drawdown Mobility (Final) ~ End Buildup Mud Pressure Before d Aft ~ M Mud Pressure After er u Temperature Before/After Pretest RateNolume 60s Slope (Final) Pressure Variance (Final) FPWD475 Type 2 - D TST475 Probe AQAP 5126.17 psia 5127.32 psia 5126.17 psia 5.883 md/cp 13.622 md/cp 6210.48 psia 6210.01 psia 151.91 DEGF / 151.85 DEGF 1 c3/s / 19.16 cc 0.04 psia/m 0.7 psia 41 Pressure Vs Time Plot : Test #10 Run 6 25907.99 ft(MD) 11191.39 ft(TVD) NS33A Schlumberger I nvestigation Fi nal 0 0 O A 0 0 O I~ 0 0 N oO 0 O I~ o 0 O I~ I N ~ LL w __ n 8 m m a ° ¢ ~ ~ ~ o- a U a W `~ w ~ a Q ~ tni a O J ~ ~ 2 (n w (~ ~ ~ - _ a ~ ~ w w ~ ~ ~ a ~ w ~ ln _"_ _.. w a ° w ~ w ~ a < g v=i a J O ~ D ~ U ¢ W ~ ~ ~ a ~ ~ Z Z 7 ~ U W Q H Q _ W ~ ~ H U Q O ~ ~ Q a r N W 0 ~ a _ ? ~ Z p a o O m 3 LL z a a LL l~ ~ N O O ~ I O O N O O 512 511 m g511 a~ ~ vi511 a~ a` 511 511 ~0~ 2~~ 1.3 Detail Pressure Plot Final 9.3 7.3 5.3 3.3 1.3 259.88 298.1 336.33 374.55 412.78 Time (sec) Time (sec) ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest Q Drawdown Start ~ Buildup Start ~ End Buildup ~ Mud After Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest RateNolume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - D TST475 Probe AQAP 5117.43 psia 5117.08 psia 5118.3 psia 5.217 md/cp 5.647 md/cp 6193.31 psia 6193.18 psia 150.4 DEGF / 150.51 DEGF 1 c3/s / 7.54 cc 0.11 psia/m 0.93 psia 42 r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Flow Regime Identification Plot : Test #10 Run 6 25907.99 ft (MD) 11191.39 ft (TVD) (Final) NS33A i i ~ ~ a~ >i .~ > .` a~ 0 a~ ~ ~ ~i a~ a` , Schlumberger 43 Spherical Time, 1/sqrt(sec) Last Buildup Pressure : 5118.3 psia E~Rrapolated Pressure : 5117.43 psia Buildup Mobility : 15.52 md/cp Spherical Slope : -6.19 Delta-Time sec Slope on Spherical -0.020 ~ ~ Slope on Radial -0.530 Pressure Vs Time Plot : Test #10 Run 6 25907.99 ft(MD) 11191.39 ft(TVD) NS33A Schlumberger Final 0 IA N N 0 ~(J Ul N I 0 0 O N 0 N N LLJ 0 i!1 N N I ~ a ~ d LL W ~ N a a a ~ a a a LL O ~ Q U W ~ W ~I Q J ~ ~ ~ Q N w j ~ a ~ ~ w ~ w a a ~ d a w ~ w ~ N v i w a O D U ~ ~ ~ W a Z a Z Q F a J ~- a W a ~ ~ W Q ^ d ~ o F Q ~ ~ ? a °0 3 Z p o a v~i LL z a LL l~ I O N N ~ o ~ r c0 r~ r~ W r ~D r c~ ~ O ~n ~ n c0 n~ ~ r ~O .-ri ~ Mud Before v Drewdown Start Irnest. 0 Buildup Start Invest ~ End Buildup Invest Drawdown Start Buildup Start ~ End Buildup ~ Mud After Time (sec) Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - D TST475 Probe AQAP 5117.43 psia 5117.08 psia 5118.3 psia 5.217 md/cp 5.647 md/cp 6193.93 psia 6193.78 psia 150.4 DEGF / 150.51 DEGF 1 c3/s / 7.54 cc 0.11 psia/m 0.93 psia 44 ~ ~ ~ N ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Pressure Vs Time Plot : Test #11 Run 6 25885.96 ft(MD) 11171.98 ft(TVD) NS33A Schlumberger Investigatio Final 0 0 O r 0 0 O r 0 0 N 0~ 0 O n o 0 O r . . . _ ._ _ _._ _ __ _..._.___. _. __ _.._ _ . ._. ._._ _._. ._-._ ._._ . . . I ~ N LL ~ a ° w ~ m a aj a a a N LL ~ ¢ n O ~ n a U O w N ~ N d ~ j r n ~i ~ C7 Q w a N W ~ a ~ ~ w w a ~ a ~ w ~ N w ~ ¢ a ~ oi a J O > ~ ~ Q ~ v Q W ~ N ~ a J Q ~ Z Q J w w Z ¢ ~ ~ a o a a ~ N w a o F d Q ~ ~ a ° 3 ~ Z ~ o ^ a 0 ~ N a ~ a LL LL ~ N O ~ O O O O O 5196.01 5176.01 100 200 uetai~ Nressure N~ot (rma~ m g5156.01 a~ ~ v~'i 5136.01 ~ a 5116.01 5096.01 243.31 294.85 346.39 397.93 449.46 Time (sec) Time (sec) ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest v Drawdown Start 0 Buildup Start ~ End Buildup ~ Mud After Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - D TST475 Probe AQAP 5166.67 psia 5139.19 psia 5166.01 psia 0.283 md/cp 0.265 md/cp 6197.81 psia 6202.74 psia 149.83 DEGF / 149.89 DEGF 0.29 c3/s / 1.59 cc 25.48 psia/m 2.21 psia 45 Flow Regime Identification Plot : Test #11 Run 6 25885.96 ft (MD) 11171.98 ft (TVD) (Final) Schlumberger Radial Time Function Plot ~ m > .~ > .` a~ ~ a~ ~ ~ ~ a~ a 2 m ~ a ~i ~ ~ N N ~ 0000 000 I I 0 1.9 0 Radial Time Last Buildup Pressure : 5166.01 psia Extrapolated Pressure : 5166.68 psia Horiz. Mobility Thickness : 0.03 md.fUCp Radial Slope : -872.34 46 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~ Delta-Time (sec) Slope on Sphencal o.s2o Slope on Radial -0.073 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Pressure Vs Time Plot : Test #11 Run 6 25885.96 ft(MD) 11171.98 ft(TVD) NS33A Schlumberger Final co N co N o ~ coQ N ~ N ~ cn ~(1 ~ cn N ~ m N ~ c-~ N ~ a A d LL W N m a a a ~ a n --__ N " m U a W Q Q ~ ~ ~~ Q d J W K ? ~ ~ i o N N a ~ I a w F , ~ N ~ ~ a ga w ~ v i w I I ~ J ¢ a ~ ~ N ~ a I ~ Q ~ a Q w a ~ (n Z , Z ~ J Q w w a a ~ a ~ o C7 a ~ N w O ~ a ¢ ~ ~ 7 ? ' a O ~ Z ~ ~ p a ~ ~ a LL a LL LL _ N N ~ rn W ~ rn o W ~ m 41 ~ m 0 v v ~ vQ v 2~~ ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest ~ Drawdown Start 0 Buildup Start ~ End Buildup ~ Mud After JVV 4VV Time (sec) Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest RateNolume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type2-D TST475 Probe AQAP 5166.67 psia 5139.19 psia 5166.01 psia 0.283 md/cp 0.265 md/cp 6197.81 psia 6202.74 psia 149.83 DEGF / 149.89 DEGF 0.29 c3/s / 1.59 cc 25.48 psia/m 2.21 psia 47 Pressure Vs Time Plot : Test #12 Run 6 25875.93 ft(MD) 11163.13 ft(TVD) NS33A Schlumberger Investigation Final 0 0 0 0 0 0 0 ~n oO o 0 o 0 0 n n r r I N LL ~ a m N a d a a W ~ a n ~ c1 U a ~ LL w ~ Q ~ tni a d ~ ~ ~ w `n j N N I ~ ~ a ~ a N ~ W ~ ~ ~a W ~ v~i w ~ a a a a w ~ ~ ~ w a J O ~ v ~ U W ~ N ~ J ~ ~ a Z j a ~ U N W Z a a H - ~ Q w a ~ ~ Q O C7 a ~ W ? a a ~ ° ~ ~ Z ~ o o ~ ~ LL z a a LL LL M O O O O OO O Time (sec) Time (sec) ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest Q Drawdown Start ~ Buildup Start ~ End Buildup ~ Mud After Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest RateNolume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type2-0 TST475 Probe AQAP 5155.53 psia 5074.01 psia 5155.53 psia 0.129 md/cp 0.125 md/cp 6189.38 psia 6188.06 psia 149.04 DEGF / 149.14 DEGF 0.19 c3/s / 0.41 cc 18.41 psia/m 2.74 psia 48 ~ r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ t , ~~ N > .~ > .~ 0 ~ ~ ~ ~ ~ ~ ~, 1 1 Flow Regime Identification Plot : Test #12 Run 6 25875.93 ft (MD) 11163.13 ft (TVD) (Final) e+o NS33A 0 Spherical Derivative ~ ~ ~ ~ ~ - - - - - - ~ ^ Radial Derivative - - - ~ - ~ - - - - - ~ ~ - ~ ~ ~ : ~~, e+0 I I ~ _ J~ I ~. ~ ~, e+~ ~ °~ ° ~. e+0 ~ ~- ^ ~: ~ e+~ ~ i ~I ~ ~ ~ 'i ~ . ~~ ~_ 1 ~ ~ e+01 1e+00 1e+01 1e+02 Delta-Time (sec) Schlumberger 49 Pressure Vs Time Plot : Test #12 Run 6 25875.93 ft(MD) 11163.13 ft(TVD) NS33A Schlumberger m ~ o ~ ~ 0 0 ~ o 0 N Q ~ N O N N O N N V N ~ ~ N LL p_ ~- a W ~ ~? n N a a F- n Q N LL d ~ Q ~ W w Q /ni O J ~- ~ w (~ ~ a W W ? a ~ ~ w v~ a a ~ ~ ~ a a ~ ~ (n ~ a J ~ ~ W ~ J O 1- W Q Q Q a ~ 2 ~ U ~ ¢ ~ U ~ W ~ F- Q O (7 Q a w a ~ Q N ~ ? ° ~ a 0 3 o LL Z p a ~ z a l~ LL r r ~ r r~ r r r~ 0 v 0 v 0 0 v 0 v o r~ r~ n n LUU ~ Mud Before Q Drawdown Start Invest. ~ Buildup Start Invest ~ End Buildup Invest Q Drawdown Start 0 Buildup Start ~ End Buildup ~ Mud After JVV Time (sec) Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest RateNolume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - D TST475 Probe AQAP 5155.53 psia 5074.01 psia 5155.53 psia 0.129 md/cp 0.125 md/cp 6189.38 psia 6188.06 psia 149.04 DEGF / 149.14 DEGF 0.19 c3/s / 0.41 cc 18.41 psia/m 2.74 psia 50 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ r ~ ~ iw ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Pressure Vs Time Plot : Test #13 Run 6 25866.94 ft(MD) 11155.19 ft(TVD) NS33A Schlumberger Inv stig Final 0 O O 0 O O 0 N 0 OO O 0 O O r~ ~ ~ n ~ . _ _ . .--- -------- ... . ___._._. . --- - - -_ _~ - --. . ._ .._ . _..._. _ _. _ . - m ~ 10 ~ r ~ ~i ------ ...--- n a w A m a a ~ ° a a m U Q " w C7 Q ~ ~7 Q d J ~ ~ ~. ~ w ~ f~ ~ ~ ~ ___- ~ N j a w a w ~ a ~ a w ~ ~ ~ w w ~ ¢ a ~ w ~ ~ N a J O ~ ~ ~- Z U a Z W ~ j ~ a ~ J Q U ~ ^ Q W a r ~ W Q a ^ ~ ~ Q N ~ ? a o ~ Z z 3 p a a g N 3 a LL a LL LL V O O O O OO p 5146.61 5126.61 ~Q~ 2~~ uetai~ m g5106.61 m ~ v 5086.61 ~ d 5066.61 5046.61 ' - 177.31 231.85 286.39 340.93 395.46 Time (sec) Time (sec) ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest Drawdown Start Buildup Start ~ End Buildup ~ Mud After Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - C TST475 Probe AQAP 5116.61 psia 2735.6 psia 5116.61 psia 0.414 md/cp 0.032 md/cp 6232.98 psia 6234.45 psia 148.51 DEGF / 149.32 DEGF 0.45 c3/s / 0.53 cc -8.74 psia/m 1.99 psia 51 L ~ O~ C ~ ~ E 0 ~ e~ CI~ .-. ~ c ~ ~ ~-. 0 > H ~ ~ ~ rn ~ ~ri ~ ~ ~ ~ ~ ~ .~ ~ ~ ~t rn ~ ~ ~ ~ N ~ C ~ ~ M ~ ~ ~ ~ ~ r--~ ~ ~ ~ ~ ~ ~ U ~ ~ C N ~ ~ ~ .~ N ~ ~ O L.L U N ~ ~ ~ ~ (B ~ ~ sani;enuaa a~nssa~d ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Pressure Vs Time Plot : Test #13 Run 6 25866.94 ft(MD) 11155.19 ft(TVD) NS33A Schlumberger Final ro r m r~ o "' mO r m r N N N N N i1~1 N N N ~ 'n LL w ~ I l l Q ~ - i a a o a ° Q a ~ LL ~ - Q U W ' W ~ d a ~I ~ d ~'i. O d N N W j ~ ~ I a f° w ~ a ~ w ~ a ~ a ¢4 w w ~ v`~i w ~ a < ~ v~i a J O ~ ~ U W ~ ~ ~ D a J W ¢ Z a Q Q ~ a J ~ ~ a w a ~ N ~ W Q ~ O ~ C7 Q Q ~ ? a ~ ° z z 3 0 3 ~ LL I a i LL a LL V O if1 O ~(1 O O tA O IA - _ O OOi OOf ~O ~ ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest v Drawdown Start ~ Buildup Start ~ End Buildup ~ Mud After Time (sec) Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest RateNolume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - C TST475 Probe AQAP 5116.61 psia 2735.6 psia 5116.61 psia 0.414 md/cp 0.032 md/cp 6232.98 psia 6234.45 psia 148.51 DEGF / 149.32 DEGF 0.45 c3/s / 0.53 cc -8.74 psia/m 1.99 psia 53 Pressure Vs Time Plot : Test #14 Run 6 25857.98 ft(MD) 11147.27 ft(TVD) NS33A Schlumberger Investigation Final 0 0 0 r 0 o 0 r 0 in oO o 0 r o 0 0 r~ A LL ~ p ~ W N m a a a ~ a n " a ~ LL Q ~ a U ' w a `ni a J ~ ~ N ~ N W N ~ ~ ~ a ~ ~ W ~ j ~ ~ a w ~ N ~ a a a ~ v~i a O v a U a Z ~ Q ~ a ~ ~ F U ___ w Z Q Q F o Q , W a ~ ~ W Q ~ 0 ~ U ~ N ~ ? a O ?i ~ z z 3 ~ ^ a ~ N a LL a LL l~ R O O ~ O O OO O 5104.21 5102.21 m g5100.21 ~ ~ ~ 5098.21 a 5096.21 5094 21 ~Q~ Z~Q uetai~ Nressure N~ot (~ina~ i I ~ Time (sec) ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest Drawdown Start Buildup Start ~ End Buildup ~ Mud After 299.25 330 360.75 391.5 422.25 453 Time (sec) Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest RateNolume 60s Slope (Final) Pressure Variance (Final) FPWD475 Type 2 - C TST475 Probe AQAP 5100.4 psia 5102.54 psia 5101.21 psia 8.777 md/cp 24.812 md/cp 6226.4 psia 6226.33 psia 149.03 DEGF / 149.21 DEGF 1 c3/s / 7.59 cc 0.41 psia/m 1.46 psia 54 ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Flow Regime Identification Plot : Test #14 Run 6 25857.98 ft (MD) 11147.27 ft (TVD) (Final) Schlumberger N~~~n Rarlial TimP Functinn Plnt ~ a~ > .~ > .~ ~ N ~ ~ ~ ~ N d m ~ a ~ ~ y ~ N ~ s2oo ~ 500 O 1800 2.1 2 0 Radial Time Last Buildup Pressure : 5101.21 psia 6Rrapolated Pressure : 5100.4 psia Horiz. Mobility Thickness : 24.328 md.ft/Cp Radial Slope : -3.61 55 Delta-Time (sec) Slope on Sphencal o.sos Slope on Radial 0.061 Pressure Vs Time Plot : Test #14 Run 6 25857.98 ft(MD) 11147.27 ft(TVD) NS33A Schlumberger N M N CI 10 NO (h N th In Y') 1L1 lA ^ b ~ ~ LL a W ~ m a a a a ~ r ~ n a m '~ a ~ a U J w ~ W ~ a w ~I (~ Q ~ ~ N ~ a ~ a' W ? a ~ ~ w ~ ~ W N w a a w ~ w ~ a a ~ ~ a O D ~ U ~ ~ ~ j a a ~ Z a Z j J ~ U Q w ~ F Q O C~ a w a ~ d a N ? a O O I ~ Z 3 ~ ~ LL II Z a ~ a LL LL R O ~ V ~ O O ~ V~ ~ O 29 0 30 0 31 0 32 0 33 0 34 0 35 0 36 0 3 70 38 0 39 0 4 00 41 0 ~ Mud Before v Drawdown Start Invest. ~ Buildup Start Invest ~ End Buildup Invest v Drawdown StaR ~ Buildup Start ~ End Buildup ~ Mud After Time (sec) Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest RateNolume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - C TST475 Probe AQAP 5103.25 psia 5102.54 psia 5103.25 psia 8.777 md/cp 21.89 md/cp 6226.97 psia 6224.93 psia 149.03 DEGF / 149.22 DEGF 1 c3/s / 7.59 cc 0.48 psia/m 1.46 psia 56 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ w ^~ ^~ ~ ~ r ^~ ^i ~ ^~^ ~ ~ ~ ~ Pressure Vs Time Plot : Test #15 Run 6 25876.96 ft(MD) 11164.04 ft(TVD) NS33A Schlumberger Invest g Final 0 0 0 0 0 0 oO 0 o o m 0 o u~ o 0 N ~ ~ ~ N ~ N ~ ~ n N a LL W m m a a a ~ a a U Q LL W Q Q ~ tn a ~ ~ a' d' W (n O N N j ~ w~ a w w ~ ~ a w ~ w a a w ~ w ~ ¢ a ~ v~i a O Q ~ Q Q ~ W W Z ~ Z Q ~ ~ U 'J ~ U Q ~ a N ~ w a a ~ F C7 a ~ J Q Q ~ Z > ~ Z ~ ~ lL -_-_ ¢ I~ a LL O N N O O O O O O O ~ O O~ O O Time (sec) Tool Type ~ Mud Before TeSt Type Drawdown Start Invest. Packer Gauge Buildup Start Invest Formation Pressure ~ End Buildup Invest Last Read (Invest) Drawdown scart 0 Last Read (Final) Mud Pressure Before 0 Buildup Start Mud Pressure After ~ End Buildup Temperature Before/After ~ M d Aner Pretest RateNolume u 60s Slope (Final) Pressure Variance (Final) Quality: bad test,no seal FPW D475 No Seal TST475 Probe AQAP psia 6233.94 psia 6229.76 psia 6232.79 psia 6231.91 psia 148.84 DEGF / 148.87 DEGF 0.37 c3/s / 0.53 cc 0.89 psia/m 4.6 psia 57 Pressure Vs Time Plot : Test #16 Run 6 25877.51 ft(MD) 11164.52 ft(TVD) NS33A Schlumberger Investigation Final 0 0 0 r~ 0 0 0 r 0 ~n oO o 0 n o 0 0 n . . - ~ N LL a a w ~ m a a a N ~ ~ a n ~ U a " Q ~ a O J ~ ~ w Ni ~ ~ N ~ j ~ ~ a a `n w a w ~ a ~ w ~ ~ w ~ a a w ~ ~ m w a o ~ Q J a ~ ~ z ~ -' U v i w z ¢ ~ U O a W a ~ r ~ H W Q d ~ ~ ~ d Q N J Z U ~ Z J 0 Q ~ Q ~ ~ LL Z a a LL LL V O O O O OO O Detail Pressure Plot Final Time (sec) 5114.15 ~ Mud Before 5112.15 -- Drawdown Start Invest. I i Buildup Start Invest m I g.5110.15 i ~ ~ End Buildup Invest ~ Q Drawdown Start ~5108.15 t ~ Buildup Start a ~ End Buildup 5106.15 ~ Mud After 5104.15 259.94 296.95 333.96 370.98 407.99 445 Time (sec) Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FPWD475 Type 2 - C TST475 Probe AQAP 5109.1 psia 5110.51 psia 5111.15 psia 3.139 md/cp 4.773 md/cp 6232.17 psia 6228.3 psia 147.96 DEGF / 148.4 DEGF 1 c3/s / 7.28 cc 3.75 psia/m 2.73 psia 58 ~ ~ ~ ~ ~ r ~ ^r ~ ~ w ^~ ~ ~ ^~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Flow Regime Identification Plot : Test #16 Run 6 25877.51 ft (MD) 11164.52 ft (TVD) (Final) Sehlumberger ~ ~ >, .~ > .` ~ 0 ~ L ~ ~ ~ 1 ^~ LL 59 Spherical Time, 1/sqrt(sec) Lasl 8uildup Pressure : 5111.15 psia E~Rrapolated Pressure : 5109.1 psia Buildup Mobility : 9.1 md/cp Sphencal Slope : -13.74 Delta-Time seC Slope on Spherical -0.017 ~ ~ Slope on Radial -0.526 Pressure Vs Time Plot : Test #16 Run 6 25877.51 ft(MD) 11164.52 ft(TVD) NS33A Schlumberger Final o `~ r~O n ~ oi r~ oi c+~ m ~n ai v , v ~ o ~ v ~ N ~ N LL a d W m m a a ~ o a ~ ~ a '~ a ~ Q a ~ ~ ~ ~ J O ~ ~ ~ j w a ~ w~ a w , ~ w w a ~ a ~ w w ~ N w ~ ¢ 1 ~ ~ c=i~ N a J O ~ D U W ~ ~ J ~ r Z a j a t~ ul Q Z Q H ~ o U Q ` w a ~ ~ ~ ¢ O ^ ~ U d a N ~ w ? a O 3 ~ Z z ~ o a N ~ a LL LL V r ~ r ~ N O n ~ r r o N N c-~ ~ c-> N ~ O M N l(] m JUU 4UU Time (sec) Tool Type ~ Mud Before Test Type v Drawdown Start Invest. PeCkBf Gauge ~ Buildup Start Invest Formation Pressure ~ End Buildup Invest Last Read (Invest) orawdown start 0 Last Read (Final) Drawdown Mobility (Invest) 0 euiidup Start Drawdown Mobility (Final) ~ End Buildup Mud Pressure Before ~ Mud After Mud Pressure After Temperature Before/After Pretest RateNolume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - C TST475 Probe AQAP 5109.1 psia 5110.51 psia 5111.15 psia 3.139 md/cp 4.773 md/cp 6232.17 psia 6228.3 psia 147.96 DEGF / 148.4 DEGF 1 c3/s / 7.28 cc 3.75 psia/m 2.73 psia 60 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Pressure Vs Time Plot : Test #17 Run 6 25864.99 ft(MD) 11153.47 ft(TVD) NS33A Schlumberger Investigation Final 0 O O 0 O O 0 N oQ O o O ~ r O r O ~ ~ N LL W _ a a ~ a ~ ~ m ~ Q a ~ i` ¢ a o ~ n a Q m U J ~ ~. w ~ d Q w tni (~ d ~ O N ~ N w ~ ~ a ~ ~ - a w a ~ a w ~ ~ w ~ ¢ a ~ v~i a O ~ D U a Z J 7 ~ a ~ ~ U W w Z ~ Q ~ ~ U ~ a (7 -_ a F N F w Q ~ ~ ~ Q Q 7 ~ ? 3 a 0 °0 ~ 3 a Z Z O '' ~ ~ a N ~+- a LL LL C O O O O O O O 5115 5111 m g5107 N ~ v 5103 a~ a` 305.2 Detail Pressure Plot (Final 355.9 406.6 457.3 Time (sec) Time (sec) ~ Mud Before v Drawdown Start Invest. ~ Buildup Start Invest ~ End Buildup Invest Q Drawdown Start ~ Buildup Start ~ End Buildup ~ Mud After 508 Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest RateNolume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - C TST475 Probe AQAP 5106.3 psia 5099.75 psia 5106.3 psia 0.26 md/cp 0.169 md/cp 6219.76 psia 6216.98 psia 147.84 DEGF / 147.59 DEGF 0.3 c3/s / 1.32 cc -.77 psia/m 2.01 psia 61 C CD ~ C ~ ~ ~ ~ ~ !~ y N ' ~ 1 ' ' , ~ c ~ ~ ~ ~ ~ ~ ti ~ M ~ T r ~C C `~ ~ ~ ~ ~ ~ ~ ~ N ~ C 7 ~ ti ~ ~ ~ H .~ O ~ C O ;_. co U w- ~ C N ~ N ~ .~ ~ ~' O LL sangenuad a~nssa~d ' 1 ' ' ' ' U N ' ~ N ~ F- m 1 ~ ~ ' ' ' 1 ' ' Pressure Vs Time Plot : Test #17 Run 6 25864.99 ft(MD) 11153.47 ft(TVD) NS33A Schlumberger 0 ~ ~ ~ 0 ~ ~ ~ 0 ~ 00 ~ ~, ~ 0 ~ ~ N ~ ~ ~ n A a LL W A m a a a ~ ~ ~ n U a N LL ° ~ d J ~ ~ ~ v ~ ~ NI a Q ~ I a N w i w ~ ~ , ~ N w ~ a a a a ~ w ~ w ~ N N w a J O ~ D U W ~ ~ J j f~ W Z a Z Q ~ F a ~ ~ U a W s F ~ Q ^ ~ d d N W Q ~ Q J ? Q O o i ~ z ~ p ~ a LL z Q ~ IL a IL ~ II II _-- -- - -_ ? I I II (`~ (h t") C~J I o ~ v m M a ~ M o r o co~ c~ r v ~o r~ ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest Q Drawdown Start 0 Buildup Start ~ End Buildup ~ Mud After Time (sec) Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FPWD475 Type 2 - C TST475 Probe AQAP 5106.3 psia 5099.75 psia 5106.3 psia 0.26 md/cp 0.169 md/cp 6219.76 psia 6216.98 psia 147.84 DEGF / 147.59 DEGF 0.3 c3/s / 1.32 cc -.77 psia/m 2.01 psia 63 Pressure Vs Time Plot : Test #18 Run 6 25849.95 ft(MD) 11140.16 ft(TVD) NS33A Schlumberger Investigation Final 0 0 0 ~ 0 0 0 r 0 ~n oO o 0 r o 0 0 r m ' ° LL - n - ° w ~ m a a a a ~ LL ~ ~ a ~ n Q U ~ w O Q cn O J O ~ ~ ~ ~ N w K (~ W ~ ~ W H ~ ~ w ~ ~ a ~ ~ a w w a ~ a ~ w ~ N ~ a a ~ ~ ~ ~ w a O ~ Q ~ Q w Q W a ~ Z U ____- - __ w ~ ~ U Q ~ _ - __-_ W F F Q O d a N w d ~ Q J ? a O ~ ~ z z o o a ~ ~ a LL LL V O O O O OO O 51 51 m g51 a~ 3 v`~i51 ~ a 51 51~„ 233.25 Time (sec) ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest Q Drawdown Start ~ Buildup Start ~ End Buildup ~ Mud After Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - C TST475 Probe AQAP 5158.61 psia 5146.86 psia 5158.61 psia 0.117 md/cp 0.142 md/cp 6209.22 psia 6210.02 psia 146.38 DEGF / 147.08 DEGF 0.18c3ls/0.25cc -8.18 psia/m 2.6 psia 64 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 278 322.75 367.5 412.25 457 Time (sec) G ~ O~ G OD ~ E 0 ~ e~ N~ ~ ~ c ~ ~ .-. ~ > H ~ ~ w ~ ~ 0 ~ ~ ~ ~ .-. ~ ~ ., ~ ~ ~ rn ~ ~ ~ ~ N ~ C ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ C O ~ cv U ~ ~_.~ C N '~ ~ ~ .~ N ~' 3 0 ~ U N ~ ~ ~ H N N 0 ~ cfl sani~eniaaa amssa~d Pressure Vs Time Plot : Test #18 Run 6 25849.95 ft(MD) 11140.16 ft(TVD) NS33A Schlumberger m m ~n co o ~ cn O ~ cn ~ ~ N ~ ~ n N r~ N ~ a N LL d I W ~ N m a a N n p U Q " W a a ~ ~I a Q~ -__. J O W ~. ~ w (~ ~ w a ~ w N w ? ~ a , ~ ~ a ~ a W N - w ~ a a w ~ ~ ai w a O ~ D U a ~ ~ a j (n W Z a Z Q j H ~ ~ U a W ~ ~ Q O ~ (~ _-- ' a N ~ W a ~ ~ Q ~ J Q ~ Z Z p ~ a ~ LL a lL LL V o rn ~ 0 °v m ~ 0 °v 0 m r 0 °o ~ rn r 0 °o 3UU Time (sec) Tool Type ~ Mud Before Test Type v Drawdown Start Invest. PBCke~ Gauge ~ Buildup Start Invest Formation Pressure ~ End Buildup Invest Last Read (Invest) Drawdown Start 0 Last Read (Final) Drawdown Mobility (Invest) ~ Buildup Start Drawdown Mobility (Final) ~ End Buildup Mud Pressure Before ~ Mud After Mud Pressure After Temperature Before/After Pretest Rate(Volume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - C TST475 Probe AQAP 5158.61 psia 5146.86 psia 5158.61 psia 0.117 md/cp 0.142 md/cp 6209.22 psia 6210.02 psia 146.38 DEGF / 147.08 DEGF 0.18 c3/s / 0.25 cc -8.18 psia/m 2.6 psia 66 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ _ ~ ~ ~ ~ ~ ~ ~ ~ ~ Pressure Vs Time Plot : Test #19 Run 6 25834.97 ft(MD) 11126.90 ft(TVD) NS33A Schlumberger Investigation Final o 0 o r a 0 a r o ~n 0 o o r 0 0 0 ~ ~ L I ~ I - A d d W N N a Q Q ~ LL ~ a ~ o_ Q I I M U w ~ d Q tni ~ O I J 0 ~ N ~ ~ ~ ~ ? a ~ a `n ~ N w a ~ ~ ~ ~ ~ w ~ a ~ a ~ ~ u~i a J O ~ Q ~ ! Q W Q W a J ~ W Q Z Q ~ ~ p U a W a ~ N ~ w Q d ^ ~ ~ Q Q J ? a O ~ 3 0 ~ > a LL z ~ a ~ a LL LL ~ O O O O I O OO O Time (sec) Time (sec) ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest Drawdown Start Buildup Start ~ End Buildup ~ Mud After Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - C TST475 Probe AQAP 5097.49 psia 5097.01 psia 5097.49 psia 14.825 md/cp 14.736 md/cp 6202.19 psia 6201.76 psia 148.6 DEGF / 148.82 DEGF 0.99 c3/s / 7.58 cc -.99 psia/m 1.87 psia 67 L ~ O~ C ~ ~ E ~ ~ ~ CI~ ~' I ~ , I ' t II , ~ m c ~ ~ ~ > H ~ ~ ~ 0 rn co N ~ ~ ~ ~ .... ti ~ ~ M ~ lf') N ~ C ~ ~ ~ ~ ~ ~ ~ ~ a ~ .. ~ "-' U O z ~ C O ~-. (0 U ~ ,-. C ~ ~ ~ ~ .~ N ~ O LL sani~eniaaa a~nssa~d ' ' 1 ' ' , ' U ' ~ ~ a~ E H ' ~ N ~ ' ' ' ' , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Pressure Vs Time Plot : Test #19 Run 6 25834.97 ft(MD) 11126.90 ft(TVD) NS33A Schlumberger n v 0 ~ n o o ~ o `~ ~ o c ~ n v v ~ '~, ~ . A LL O. ~' LLJ l0 t0 a v~ a ¢ ~ LL ~ ¢ ~ O ~ n a . U a ~ w~ ~ ~ v i Ni d a J ~ N ~ j ~ ~ a N w a w ~ ~ a W ~ N w ~ a a a w g ~ ~n w a J o Q ~ ~ Q Q ~ w a ~ cn w Z ~ Z ~ ~ a J ~ Q ~ a w d o ~ a Q N -~ ? a O ~ Z z p a ~ LL a LL LL I I ~ O m V [O ~ V _ " m V t0 ~ Q I O M Q (O N V _ l"J V (D ~ V __ . ,. .. ,. .., .. ... .. o n a n ~ n v n ~ Mud Before v Drawdown Start Invest. ~ Buildup Start Invest ~ End Buildup Invest v Drawdown Start 0 Buildup StaR ~ End Buildup ~ Mud After Time (sec) Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FP W D475 Type 2 - C TST475 Probe AQAP 5097.49 psia 5097.01 psia 5097.49 psia 14.825 md/cp 14.736 md/cp 6202.19 psia 6201.76 psia 148.6 DEGF / 148.82 DEGF 0.99 c3/s / 7.58 cc -.99 psia/m 1.87 psia 69 Pressure Vs Time Plot : Test #20 Run 6 25823.01 ft(MD) 11116.29 ft(TVD) NS33A Schlumberger Investigation Final 0 0 0 r~ 0 0 0 r~ 0 ~n oQ o 0 r o 0 0 r ~ A I LL a d W ~ m a ~ a n a cn Q ~ F- ¢ O a U a W LL O W ~ ~I a Q O ~ ~ ~ ~ ~ ~ ~ a w w ~ a y ~ ~ w ~ a ~ a ~ w w N w a O Q ~ Q Q w a ~ Z U u1 Z Q Q li ~ J O a _______ W a ~ ~ I , Q ~ ~ d N w ~ ~ J ~ Z . J; ! U Q ~ Q 3 Z Z ~ a y LL a LL LL R O O O O OO p 5092.81 5090.81 m g5088.81 a~ ' 0 5086.81 ~ a 5084.81 5082.81 334.25 Time (sec) ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest ~ Drawdown Start Buildup Start ~ End Buildup ~ Mud After Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest RateNolume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - C TST475 Probe AQAP 5090.34 psia 5091.71 psia 5089.81 psia 2.653 md/cp 5.107 md/cp 6208.9 psia 6211.3 psia 148.3 DEGF / 148.96 DEGF 0.99 c3/s / 6.84 cc 0.48 psia/m 1.86 psia 70 ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 368.6 402.95 437.3 471.65 Time (sec) ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ r ~ ~r i ~ r ~ Flow Regime Identification Plot : Test #20 Run 6 25823.01 ft (MD) 11116.29 ft (TVD) (Final) Schlumberger Radial Time Function Plot ~ a~ > .~ > .~ 0 a~ ~ ~ ~ ~ a~ ~ m ~ fl a~ ~ ~ ~ ~ a~ a sooo soo ~ 3000 z2 0 Radial Time Last Buildup Pressure : 5089.81 psia E~ctrapolated Pressure : 5090.34 psia Horiz. Mobility Thickness : 9.99 md.ft/Cp Radial Slope : -878 71 Delta-Time (sec) Slope on Spherical o.asa Slope on Radial 0.046 Pressure Vs Time Plot : Test #20 Run 6 25823.01 ft(MD) 11116.29 ft(TVD) NS33A Schlumberger N N O ~ NO N V ~ O ~ O ~ Q ~ ~ N lA In I ~ N IL n a a a ¢ w ~ ~ a m a LL U a ~ w ~ d ¢ ~ ~i Q O O ~ ` +~ w ~ w ~ N j a ~ a ~ W a W ~ a ~ ~ ~ N ~ ~ a a ~ g rn ~ a O D ~ U a J w ~ a ~ W Z Z ~ ~ J O a w ~ a o a a N w d ~ Q ~ ~ ? Q p O o ~ Z Z ~ O a y LL a LL ,~ v m ro rn m ~ m o rn m m m ~o m o ~ r> ~ M ~Q ~ ~ c~ 33 0 34 0 35 0 36 0 37 0 3R n 3a n nn n e~ n Time (sec) Tool Type FPWD475 ~ Mud Before Test Type Type 2- C Q Drawdown Start Invest. PaCker TST475 Probe Gauge AQAP 0 Buildup Start Invest Formation Pressure 5090.34 psia ~ End Buildup Invest Last Read (Invest) 5091.71 psia Q orawdown start Last Read (Final) 5089.81 psia Drawdown Mobility (Invest) 2.653 md/cp ~ Buildup Start Drawdown Mobility (Final) 5.107 md/cp ~ End Buildup Mud Pressure Before 6208.9 psia ~ Mud Aner Mud Pressure After 6211.3 psia Temperature Before/After 148.3 DEGF / 148.96 DEGF Pretest RateNolume 0.99 c3/s / 6.84 cc 60s Slope (Final) 0.48 psia/m Pressure Variance (Final) 1.86 psia ~2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Pressure Vs Time Plot : Test #21 Run 6 25802.02 ft(MD) 11097.70 ft(TVD) NS33A Schlumberger Investigation Final °o ~ °o ~ u°~ o° O ~ °o ~ ~ a N d LL W ~ N ~ a a a ~ LL ~ a a ~ a d ~ ~ ~ Ni a O ~ N ~ a w~ w w ~ ~ ~ w ~ N w ~ a a a a g ~ v7i w a J O ~ ~ ~ V W ~ N ~ J Q > a F h Z Z j a ~ U W a~y Q a ~ ~ w Q d O ~ d Q N J ? a O ~ ~ 3 0 ~ a ---- - - . . . _ z z a ~ ,~ i ~ a ,~ N LL u~ N O O O O O p -- Time (sec) Time (sec) ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest Drawdown Start Buildup Start ~ End Buildup ~ Mud After Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) M ud Pressure Before Mud Pressure After Temperature Before/After Pretest RateNolume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - C TST475 Probe AQAP 5083.95 psia 5083.53 psia 5085.4 psia 4.688 md/cp 18.072 md/cp 6185.35 psia 6181.79 psia 148.75 DEGF / 148.97 DEGF 0.99 c3/s /6.09 cc 0.43 psia/m 1.48 psia 73 Flow Regime Identification Plot : Test #21 Run 6 25802.02 ft (MD) 11097.70 ft (TVD) (Final) Schlumberger N~33A Rariial Tima Fi inrtinn Plnt ~ a~ > .~ > .~ 0 ~ ~ ~ ~ a~ ~ a c u v u a a` sooo soo ~ 4000 2 ~ 0 Radial Time Last Buildup Pressure : 5085.4 psia EMrapolated Pressure : 5083.95 psia Horiz. Mobility Thickness : 17.074 md.WCp Radial Slope : -5.13 74 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Delta-Time (sec) Slope on Spherical o.s,3 Slope on Radial 0.075 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Pressure Vs Time Plot : Test #21 Run 6 25802.02 ft(MD) 11097.70 ft(TVD) NS33A Schlumberger N I~ O ~ NO 1~ N 1~ N M ~ (h N _ _ .. _._-- N d LL ~ Q W o ~ a N a M U N LL ~ ¢ O O (n a a U ' J W ~ W l N Q _ ___._________' O a N w ~ ~ a ~ ~ ~ ~ W N w a w ~ w j ¢ ~ g ~ ~ a O ~ U a w ~ ~ a Q ~ w Q H ~ ^ J Q U U' 2 a ~ w a d OW ~ O a ? U Q ~ 3 - - ~ LL O a LL N LL I II I I I N N ~ ~ W o ~[J tD a O N tp o~ ~(1 tp e ~ Mud Before Drawdown Start Invest. Buildup Start Irnest ~ End Buildup Invest Q Drawdown Start 0 Buildup Start ~ End Buildup ~ Mud After Time (sec) Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest RateNolume 60s Slope (Final) Pressure Variance (Final) F PW D475 Type 2 - C TST475 Probe AQAP 5083.95 psia 5083.53 psia 5085.4 psia 4.688 md/cp 18.072 md/cp 6183.84 psia 6181.79 psia 148.75 DEGF / 148.97 DEGF 0.99 c3/s / 6.09 cc 0.43 psia/m 1.48 psia 75 Pressure Vs Time Plot : Test #22 Run 6 25792.97 ft(MD) 11089.68 ft(TVD) NS33A Schlumberger Investigation Final 0 0 0 r 0 0 0 ~ 0 ~n oO o 0 n o 0 0 r- R ~ a a LL W m a a a ~ a N a Q ~ LL ~ ~ a U w w ~ a NI N Q O N N j ~ w a a, a N w W ~ ~ ~ w ~ ~ w a a ~ w ~ a a ~ u~i a J O ~ D ~ U W ~ N ~ J ~ ¢ a Q a ~ (n W Z Z a ~ ~ Q W a ~ ~ Q ~ ~ C~ Q a N ~ w d ~ Q J Z J U Q ~ 3 Z p 0 N a Z a LL a LL LL O M O O O O O p Time (sec) Time (sec) Tool Type ~ Mud Before Test Type Drawdown Start Invest. Packer Gauge Buildup Start Invest Formation Pressure ~ End Buildup Invest Last Read (Invest) Drawdown Start Last Read (Final) Drawdown Mobility (Invest) Buiidup Start Drawdown Mobility (Final) ~ End euildup Mud Pressure Before ~ Mud After Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) ~~ Pressure Variance (Final) FPW D475 Type 2 - C TST475 Probe AQAP 5082.01 psia 5085.16 psia 5085.58 psia 15.098 md/cp 14.124 md/cp 6197.46 psia 6192.61 psia 148.52 DEGF / 148.78 DEGF 1 c3/s / 7.57 cc 0.26 psia/m 2.39 psia 76 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Flow Regime Identification Plot : Test #22 Run 6 25792.97 ft (MD) 11089.68 ft (TVD) (Final) Schlumberger Radial Time Function Plot , i a~ > c~ > .` a> ~ ~ ~ 7 N ~ N d~ 1 c~ ~ n a~ L 7 N ~ ~ L a. jooo 500 O 4000 z.~ z o Radial Time Last Buildup Pressure : 5085.58 psia Extrapolated Pressure : 5082.01 psia Horiz. Mobility Thickness : 18.641 md.fUCp Radial Slope : -4.73 77 Delta-Time (SeC) Slope on Spherical o.sz~ Slope on Radial -0.003 Pressure Vs Time Plot : Test #22 Run 6 25792.97 ft(MD) 11089.68 ft(TVD) NS33A Schlumberger m N N ~ rn N ~ o ~ ~~ ~ rn N N ~ ~ m N N ~ N LL a d W 1° N a a Q p a _ o_ Q ~ LL ~ C/ ~ Q ° ~ w ~ a w Ni N a ~ ~ ~ ~ a ~ rn w w ~ r ~ w ~ N a Q a a ~ ~ v~i w a H ¢ U F Q ~ a Q ~ z Z QQ ~ ~ Q ~ ~y r fn U Q ^ W d ~ W ? CJ U ~ Q J ~ Z ~ a p O ~ ~ ~ I z a LL a LL I --- N cD N O N . cO N O O N N N O~ N ~O N V ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest Q Drawdown Start 0 Buildup Start ~ End Buildup ~ Mud After Time (sec) Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) F PW D475 Type 2 - C TST475 Probe AQAP 5082.01 psia 5085.16 psia 5085.58 psia 15.098 md/cp 14.124 md/cp 6197.46 psia 6192.61 psia 148.52 DEGF / 148.78 DEGF 1 c3/s / 7.57 cc 0.26 psia/m 2.39 psia 7$ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Pressure Vs Time Plot : Test #23 Run 6 25813.96 ft(MD) 11108.28 ft(TVD) NS33A Schlumberger Investigation Final 0 0 0 r 0 o 0 r 0 in oO o 0 r o 0 0 r N LL ~ n ° w A m a a ~ ~ n a a " a ~ a U w ' w ~ Q NI ~ d O R ~ W ~ w ~ N j a a, a y w W ~ r ~ w ~ ~ w a a w ~ ~ w a ~ ¢ a ~ ~ N J O > ~ ~ Q U Q W ~ ~ a J Q ~ ~ z Q J u' z a ~ a w Q ~ ~ a ° o c~ a a N w a ~ Q J ? Q Q ~ z z 3 ~ 3 a ~ LL a LL LL O l"J O O O O OO O Time (sec) Time (sec) ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest v Drawdown Start 0 Buildup Start ~ End Buildup ~ Mud After i5 Tool Type Test Type Packer Gauge Form ation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - C TST475 Probe AQAP 5088.25 psia 5090.26 psia 5089.1 psia 3.562 md/cp 11.056 md/cp 6204 psia 6203.08 psia 148.67 DEGF / 149.12 DEGF 1 c3/s / 7.54 cc 0.72 psia/m 1.88 psia 79 Flow Regime Identification Plot : Test #23 Run 6 25813.96 ft (MD) 11108.28 ft (TVD) (Final) N~~'~A ~ N > .~ > .~ 0 ~ 7 N ~ N ~ d Radial Time Function Plot ~ ~ a m ~ ~ ~ ~ d a Schlumberger sooo 500 ~ 4000 2.1 2 0 Radial Time Last Buildup Pressure : 5089.1 psfa Extrapolated Pressure : 5088.26 psia Horiz. Mobility Thickness : 45.04 md.fUCp Radial Slope : -1.95 8~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Spherical Time, 1/sqrt(sec) Lasl Buildup Pressure : 5089.1 psia E~Rrapolated Pressure : 5087.81 psia Buildup Mobility : 16.94 rtxllcp Sphencal Slope : -5.42 Delta-Time (sec) Slope on Sphencal o.ozo Slope on Radial -0.443 Slope on Sphencal 0.512 Slope on Radial -0.030 Pressure Vs Time Plot : Test #23 Run 6 25813.96 ft(MD) 11108.28 ft(TVD) NS33A Schlumberger N 1n N N O ~ N ~f N N r u~'~ n u~'~ r ~ r N ~ ~ N a LL W m a a a Q ~ N o N 0 a N `~ a ~ a U ~ NI ~ - O ~ ~ N W ? ~ ~ a W w ~ a ~ ~ ~ w w ~ a a a a w ~ ~ a ~ ~ ~- ~ O c .~ a Z Q a ~ f- Z ~ ~ J ~ Q F ~ F~ U Q ^ ~9 Q F- (n W _ _ . . N w ~ a F a ? ? I a p ~ z ~ o ~, 3 ~ LL z a ~ ~ LL I I a ~y - - I I O O N r O N r o O Y"~ r O LL1 r o c+~ a c~ a c~ v v 29 0 30 0 31 0 320 3 30 34 0 35 0 36 0 37 0 38 0 39 0 40 0 Time (sec) Tool Type ~ Mud Before Test Type v Drawdown Start Invest. Packer Gauge 0 Buildup Start Invest Formatio~ Pressure ~ End Buildup Invest Last Read (Invest) Drawdown start ~ Last Read (Final) Drawdown Mobility (Invest) 0 Buildup Start Drawdown Mobility (Final) ~ End Buildup Mud Pressure Before ~ Mud After Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - C TST475 Probe AQAP 5088.25 psia 5090.26 psia 5089.1 psia 3.562 md/cp 11.056 md/cp 6204 psia 6203.08 psia 148.67 DEGF / 149.12 DEGF 1 c3/s / 7.54 cc 0.72 psia/m 1.88 psia 81 Pressure Vs Time Plot : Test #24 Run 6 25827.96 ft(MD) 11120.68 ft(TVD) NS33A Schlumberger Investigation Final 0 O 0 O 0 N 0 OO 0 O O O O O ~ ' __. _ __-__ "_-_" ____'-"--_ _ "' ___ . _ . _ _ " _ . _ _ ...._ .; +\j~ A A LL _ a a a a Q ~ Ur w ~ ¢ m o O m n U u i a LL Q ai a O J O ~ N ~ ~ ~ j Ni ~ ¢ w~ W F a a w w a ~ a ~ ~ N w ~ a a ~ N a O U ~ v a J ~ ~ a ~ N Z Z ~ ~ U W Q ' ' H U ~ Q - w a a' F d H w Q O (~ Q ~ ~ ? a Q ~ O Q o ~ ~ 0 y 3 ~ Z z Q p a LL li -_ __ N O O O O OO O Time (sec) ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest Drawdown Start Buildup Start ~ End Buildup ~ Mud After Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Invest) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FPW D475 Type 2 - C TST475 Probe AQAP 5091.7 psia 5092.48 psia 5093.24 psia 2.404 md/cp 3.616 md/cp 6220.16 psia 6216.03 psia 148.66 DEGF / 149.25 DEGF 1 c3/s / 6.23 cc -.91 psia/m 2.74 psia 82 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 305.63 345.5 385.38 425.25 465.13 505 Time (sec) ~ ~ s ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ r~ ~ ~ , 1 1 ~ N > .~ > .~ ~~ N 7 ~ ~ N d 1 Flow Regime Identification Plot : Test #24 Run 6 25827.96 ft (MD) 11120.68 ft (TVD) (Final) Schlumberger e+p --- ~ Spherical Deriva[ive ~, ~, ~ - : --_~ . . _ ~. ~ ~. . . . . - ^ Radial Denvative ~ ~ ~ ~ - - - - - ~ ~ ~ - - - ~ ; . . . . . . . . . . . . . . . . _ . . . . ..... . . . .... . . . . .. . . . ..... . . . . . . . , ~ . . . . -~. . . . . ~ . . e+0 ~- ~ ~' . -~t. ~ . e+0 ~ ~ + . . __ . .. . . . . .. . OO.. . , . . . .. e+0 O : O ~ ~ ~. _i_ .. ~^ i e+01 ^ . ~- ~ . +_ _ _ e+0 ^ : i~ ~~ o, $ _ ~ ~ T le-O1 ~e+00 1e+01 1e+02 Delta-Time (sec) Slope on Spherical o.s~2 Slope on Radial -0.096 (6 N a m ~ ~ ~ N d 3000 i 400 O zooo ~ ~ Radial Time Last Buildup Pressure : 509324 psia 6ctrapola[ed Pressure : 50917 psia Horiz. Mobility Thickness : 10.633 md.ft/Cp Radial Slope : -8.26 83 Pressure Vs Time Plot : Test #24 Run 6 25827.96 ft(MD) 11120.68 ft(TVD) NS33A Schlumberger 0 N O C') N 0 N O C) U1 0 ~ op N O C~ N o N O l~'I N ~ a N a LL W A m , a vai a a Q N '~ ~ ¢ o Q O ~ a a a U , w ' w ~ Q tn ~i d a O H a ~ N ~ W ~ F W a ~ w j w a ~ a ~ ~ w ~ O a D a ~ U ~ ~ v~i ~ ~ a ~ ~ f~ a Z a Z I a ~ a J ~ Q ~ Q ~ ~ U ^ ~ ~ i1 a r F W Q ^ Q - __ N ~ ? a a ~ °0 Q 3 ~ z z o o a N ~ a LL LL N O in ~ N th N ~ N (~ O ~ ~ N f")O Yi r N (~.l 3n n ~~n 'i~ n za n ze n as n ~a n ~~ n Time (sec) Tool Type FPWD475 ~ Mud eefore Test Type Type 2- C Q Drawdown Start Invest. Packer TST475 Probe Gauge AQAP ~ euiidup Start Invest Formation Pressure 5091.7 psia ~ End Buildup Invest Last Read (Invest) 5092.48 psia Q Drawdown Start Last Read (Final) 5093.24 psia Drawdown Mobility (Invest) 2.404 md/cp ~ Buildup Start Drawdown Mobility (Final) 3.616 mdlcp ~ End Buildup Mud Pressure Before 6220.16 psia ~ nnud Aner Mud Pressure After 6216.03 psia Temperature Before/After 148.66 DEGF / 149.25 DEGF Pretest Rate/Volume 1 c3/s / 6.23 cc 60s Slope (Final) -.91 psia/m Pressure Variance (Final) 2.74 psia 84 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Pressure Vs Time Plot : Test #25 Run 6 25619.92 ft(MD) 10935.78 ft(TVD) NS33A Schlumberger Inves ation Final m N m ~ o O rnQ N rn ~ ~ 0 ~ r 0 ~ ~n r~ 0 ~ n 0 ~ I ~ I ~ _ ~ -y LL Ur n a a ° w ~ ~9 a m ' Q Q LL d ~ a a U W w ~ a W v~i [~ a J Q ~ N ~ i N W j a ~ ~ a ~ ~ ~ w ~ a a ~ ~ w ~ a a ~ g ~ a O ~ U Q w J 'n a ~ ___' f~/7 Z ~ Z ~ ~ ^ U a ~ w a ~ ~ w a Q ^ ~ ~ ~ 0 I z 3 ~ a ! z 0 a ~ LL ~ a LL LL I I O O M N N N N I ~ ~ N N i(J N O O ~ O ~ V ~ VO ~ O Time (sec) Tool Type ~ Mud eefore Test Type Drawdown Start Invest. PaCker Gauge Buiidup Start invest Formation Pressure ~ End Buildup Invest Last Read (Invest) Drawdown start 0 Last Read (Final) Mud Pressure Before ~ Buildup Start Mud Pressure After ~ End euiidup Temperature Before/After ~ Mud After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) Quality: bad test,no seal FPW D475 No Seal TST475 Probe AQAP psia psia psia 6020.13 psia 6019.75 psia 148.43 DEGF / 147.87 DEGF 1.13 c3/s / 7.44 cc 2.63 psia/m 2.57 psia 85 Pressure Vs Time Plot : Test #26 Run 6 25620.96 ft(MD) 10936.71 ft(TVD) NS33A Schlumberger Final 0 0 0 r 0 0 0 r 0 ~n oO o 0 n o 0 0 t~ ~ ~ I I ~ L a d W A m a Q ~ a ~ ~ i ° r a ~ a a U a '~ o ¢ d ~ w ~ 1 i~ ~~ O ~ ~ ~ j w ~ ~ w w ~ a a w a ~ a w ~ N w ~ a a ~ ~ ~ ~ a ~ U U ~ ~ ~ 7 Q Z i a Z' I Q a J U W a Q H o Q w a ~ ~ ~ `n a o ~ a ~ ~ w ? I ~ ~ Q Z Z p a O ~ ~i a a ~ a LL li _ N N O O O O O O m a ~ ~ ~ m a Time (sec) ~ Mud Before Drawdown Start Invest. Buildup Start Invest ~ End Buildup Invest Drawdown Start Buiidup Start ~ End Buildup ~ Mud After Tool Type Test Type Packer Gauge Formation Pressure Last Read (Invest) Last Read (Final) Drawdown Mobility (Final) Mud Pressure Before Mud Pressure After Temperature Before/After Pretest Rate/Volume 60s Slope (Final) Pressure Variance (Final) FPW D475 Normal Pretest TST475 Probe AQAP 1814.94 psia 1416.69 psia 1814.94 psia 0.095 md/cp 6021.75 psia 6021.98 psia 145.8 DEGF / 146.04 DEGF 0.46 c3/s / 1.79 cc 107.45 psia/m 1.46 psia 86 ~ ~ ~ ~ _ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 160 222 284 346 408 470 Time (sec) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Flow Regime Identification Plot : Test #26 Run 6 25620.96 ft (MD) 10936.71 ft (TVD) (Final) Schlumberger ~ ~ > .~ > .~ 0 ~ L ~ ~ ~ ~ a Delta-Time (sec) 87 ~~~ ~ ~ ~~~ Sperry-Sun ab~-~3~~ f ' HALLIBURTON Sperry Drilling Services B.P. EXPLORATION, INC END OF WELL REPORT NS33 PB-1, PB=S TABLE OF CONTENTS 1. General Information 2. Daily Summary 3. Morning Reports 4. Bit Record 5. Mud Reports 6. Show Reports 7. Survey Report 8. Days vs Depth 9. Gas & Lithology ASCII data 10. Formation Evaluation Logs 11. Engineering Log HALLIBURTON Sperry ©rilling Services GENERAL WELL INFORMATION Company: Rig: Well: Field: Borough: State: Country: API Number: Sperry-Sun Job Number: Job Start Date: Job End Date (TD): North Reference: Declination: Dip Angle: Total Field Strength: Date Of Magnetic Data: Wellhead Coordinates N: Wellhead Coordinates W: SDL Engineers: B.P. Exploration, Inc. Nabors N33E NS 33 PB-1 & PB-2 North Star Island North Slope Alaska United States 50-029-23325.00 AK-AM-0004888594 29tH January 2007 PB-1 - 31St March 2007 PB-2 - 6t" May 2007 True 24.10 deg 80.11 deg 57669 nT April 21, 2007 North 70 deg 29 min 29.84 sec West 148 deg 41 min 36.03 sec Tom Mansfield Mark Lindloff Robert Haverfield Company Geologist: SSDS Unit Number: Katie Nitzberg 107 HALLIBURTON Sp®rry Drilling ~ervic®s ' DAIRY OF EVENTS BP EXPLORATION - NORTHSTAR NS33 PB 1 ' Diary of Events ' 25th Jan 2007 Ri u on NS 33 9 p ' 26th Jan 2007 Working on # 3 mud pump, preparing rig for spud. 27th Jan 2007 Filled riser to check for leaks, plan to commission 3rd mud pump, then ' pick up BHA to spud well. 2$th Jan 2007 Commissioned 3rd mud pump. Picked up washout BHA, rig up Gyro ' data survey equipment. TIH to washout conductor. 29t" Jan 2007 Commenced Drilling Drilling ahead and taking gyro surveys. ' Drilled F/203' MDT/873' MD Avg ROP 174 FT/HR 30th Jan 2007 Drilling ahead and sliding to maintain angle. ~ Drilled F/874' MD T/2502' MD Avg Gas was 22 units, Max Gas was 69 units @ 2302' MD ' Avg ROP was 125 ft/hr, Max ROP was 843 ft/hr @ 2033' MD 31st Jan 2007 Drilling ahead. Gas has been pretty linear, no peaks to report. Samples ' have been sandy till 4100'. After 4100' heavy clays. Drilled F/2503' MD T/4175' MD Avg Gas was 15 units, Max Gas was 74 units @ 2757' MD Avg ROP was 1.52 ft/hr, Max ROP was 668 ft/hr @ 4012' MD Formation Stats: Top of Permafrost 1229' MD, 1179' TVD Avg Gas 14 units Max Gas 38 units CLY : 65% It gy-gy, sft, amorph- mudst, gmmy, hydphyl, carb specs, shell frags, ncalc. SD : 35% wht, clr-trnsl, grn, fn-md gr, w srt, uncons, stky cly mtx, pyr, ncalc. ' Base of Permafrost 1622' MD, 1576' TVD SD : 45% wht, clr-trnsl, blk, fn-md gr, crs ip, w srt, uncons, stky cly mtx, pyr, glauc. carb specs, mod talc. ' COAL : 10% brn-blk, Ise, fis ip, blky, brit, LIG : 15% brn-drk brn, predom sdy, fri-frm, blky, ang, fis ip, tr pyr. CLY : 30% gy, hydphyl, abdnt pyr. r SV6 4052' MD, 3057' TVD Avg Gas 6 units, Max Gas 26 units CLY : 100% It gy/brn sft, gmmy, amorph-mdst, sdy, carb specs, lith frgs, mic pyr & glauc, sli talc. 1St Feb 2007 Drilled to 4487' TD, pumped weighted sweep followed by Hi-Vis red mud sweep. circulated four bottoms up. POOH Avg Gas was 7 units, Max Gas was 13 units @ 4354' MD Avg ROP was 90 ft/hr, Max ROP was 207 ft/hr @ 4354' MD Page 1 DAIRY OF EVENTS BP EXPLORATION - NORTHSTAR NS33 PB1 2"a Feb 2007 Pick up 21" hole opener. RIH and ream 16" hole out to 21". Maintaining steady progress to keep pilot guide in pilot hole. Swivel packing leaking at 1700'. CBU, pulled 2 stds. Shut off pumps. Fixed packing. Resumed reaming with no problems. ' 3ra Feb 2007 Continued reaming 16" hole out to 21" to TD 4487'. Pumped weighted sweep, followed with two Hi-Vis red mud sweeps. Pumped dry job and POOH in preparation to run casing. 4th Feb 2007 Rig up all casing equipment in preparation to run 16" casing. Running casing. 5th Feb 2007 Continue to RIH with 16" casing, At 3495' casing stuck, (Nothing unusual in the formation was noted that showed any potential problems) Was able to work casing free, circulated to for a while, now continuing to run casing. 6th Feb 2007 Continue to wash/run casing into the hole. Tight spot @ 3881', worked pipe through and continue to casing to bottom. Rig down casing equipment. Currently rigging up cement equipment 7th Feb 2007. Completed cementing 16" casing as per well plan, with full returns back. POOH at report time. No gas was observed at Bottoms Up. 8th Feb 2007 Left Island 9th Feb 2007 Off Island 10 Feb 2007 Off Island 11 Feb 2007 Off Island 12th Feb 2007 Testing BOP's 13th Feb 2007 Finish testing BOP's, P/U BHA, RIH with single stands, cut and slip drill line, test casing. ' 14th Feb 2007 Test casing to 2500 psi for 30 minutes. RIH and drilled out shoe track. Drilled 20 feet of new formation, Performed a FIT to 11.5 ppg. Begin drilling ahead with a 12.125" bit with a 14.75" ghost reamer. Drilled F/4487' - T/5848' Avg Gas was 9 units, Max Gas was 27 units @ 5794' MD Avg ROP was 129 ft/hr, Max ROP was 352 ft/hr @ 5372' MD ' SV5 4838' MD, 3307' TVD Avg Gas 13 units Max Gas 27 units CLY : 80% It gy, gy; calc; slty; sft, stky; ' SD : 20% wh, trnsl; sub rnd, vfn-fn; fri 15th Feb 2007 Drilling Ahead, I' Page 2 L DAIRY OF EVENTS BP EXPLORATION -NORTHSTAR NS33 PBI Drilled F/5848' - T/7668' ' Avg Gas was 83 units, Max Gas was 247 units @ 6567' MD Avg ROP was 182 ft/hr, Max ROP was 436 ft/hr @ 6039' MD ~' SV4 5752' MD, 3613' TVD Avg Gas 68 Units Max Gas 247 CLY : 20% mdgry-grybrn, sft, amor, gmmy, stky, clyy grdng to slty, hydphyl, ncalc. SLT : 40% Itgry/brn, f-crs grn, predom qtz, sme chit & fspr, amor, sft, slty grdg to sdy, lith frgs, carb specs, n calc. SD : 40% trnsl, occ wh, of-f grn, sb ang, m-w srt, uncons, n calc, cly gdng to slty mtx, lith frags, carb specs. ' SV2 6920' MD, 3998' TVD Avg Gas 95 Units Max Gas 187 SD : 100% trnsl, f-vf gr grdg to slt, 90% qtz, sbrnd-sbang, arg, p cmtd-uncons, sil cmnt, m calc, nsnf . 16th Feb 2007 Drilling Ahead, Drilled F/7668'- T/9823' Avg Gas was 75 units, Max Gas was 164 units @ 8184' MD ' Avg ROP was 128 ft/hr, Max ROP was 412 ft/hr @ 8153' MD SV1 8141' MD, 4386' TVD Avg Gas 82 Unit: ' CLY : 60% It gy, gy; sli calc; sli slty. SD : 10%bl, trnsl, op; v f gr; qtz; sub rnd; p srt; trnsl; SLT : 30% It gy, gy; v f gr. Max Gas 164 fri; uncons; n calc . Ugnu 9245' MD, 4736' TVD Avg Gas 51 Units Max Gas 206 SD : 75% wht, clr-trnsl, It gry, blk, f-vf gr, sb ang, w srt, slty mtx, 65% qtz, 30% cht, uncons , ncalc SLTST : 25% It-md gry, amor, blky ip, sft, chit frgs, micr mic, of-f sd, ncalc. 17th Feb 2007 Drilled ahead to short trip point, circulated 4 B/U with no gas to speak of. POOH to 7300' MD, RIH to 7600, Circulated, then POOH to shoe with no problems. Drilled F/9824' - T/10361' ' Avg Gas was 44 units, Max Gas was 133 units @ 10223' MD Avg ROP was 117 ft/hr, Max ROP was 283 ft/hr @ 10047' MD ' 18th Feb 2007 Finish running in the hole with no problems, Drilling ahead at report time. Noted at 11570` MD, 5480' TVD, a 30' and coal bed. Metal from Ditch Magnets 4.5 oz, **Metal from G&I 25 lbs. ' Drilled F/10362' - T/11666' Avg Gas was 50 units, Max Gas was 278 units @ 11584' MD Avg ROP was 93 ft/hr, Max ROP was 425 ft/hr @ 11161' MD 19th Feb 2007 Drilling ahead, encountered hard stringers off and on. Rotary Steerable failed to respond to commands, Decided to POOH and change Rotary Steerable. Pulled ' Page 3 ' DAIRY OF EVENTS BP EXPLORATION - NORTHSTAR NS33 PB 1 up a few stands, CBU 4 times, RIH and circulate 2 more times, then POOH, No trip gas was observed at B/U. POOH at report time. Metal from Ditch Magnets 3 oz, Metal from G&I 5 lbs. Drilled F/11667' - T/12177' Avg Gas was 48 units, Max Gas was 105 units @ 11970' MD Avg ROP was 72 ft/hr, Max ROP was 349 ft/hr @ 11812' MD 20th Feb 2007 Pooh. Tight spot at 10500ft md. RIH 3 stands and circulate B/U, . . Continue to pooh Continue to pooh without incident. Out of hole 1800 hrs. Stabilizers under gauge, 11.5". Rig up to test BOP's. Daily Weights: No metal from the ditch magnets today, no drilling. 21St Feb 2007 Tested BOP's, Pick Up BHA, Start RIH. Daily Weights: No metal from the ditch magnets today, no drilling. 22"d Feb 2007 Continue to RIH to shoe, Cut and slip Drill line, Continue to RIH, Washed down last 2 stands. Drilling ahead at report time. Metal from Ditch Magnets 3.4 oz, **Metal from G&I 20 lbs. Note G&I cleaned their Process One tank, May account for the metal. It was a lot of what looked like pipe scale. Drilled F/12178' - T/12337' AVG gas was 10 units, Max Gas was 17 Units @ 12192' MD AVG ROP was 174 ft/hr, Max ROP 444 ft/hr @ 12291' MD 23~d Feb 2007 Drilled ahead F/12338" - T/13965' AVG gas was 24 units, Max Gas was 43 Units @ 13857' MD AVG ROP was 102 ft/hr, Max ROP 417 ft/hr @ 12587' MD Metal from Ditch Magnets 1.8 oz, **Metal from G&I 3 Ibs 24th Feb 2007 Drilled ahead F/13965' - T/15381' AVG gas was 62 units, Max Gas was 153 Units @ 15357' MD AVG ROP was 129 ft/hr, Max ROP 377 ft/hr @ 14746' MD Metal from Ditch Magnets 1 oz, **Metal from G&I 5 Ibs. Schrader Bluff 14081' MD, 6265' TVD Avg Gas 74 Units Max Gas 159 Units CLY : gy, dk gy; calc; slty; plas; hydphyl, sli stky; carb. SLTST : It gy, gy; v f gr; rnd, sub rnd; mod srt; uncons. SD : wh, It gy, trnsl; m gr, f gr; qtz; sub spher; sub rnd, sub ang; p srt, mod srt; fri 25th Feb 2007 Drilling Ahead F/15381' MD - T/ 16449' MD with no difficulties but for a few hard stringers. At 16449' and a drop in SPP was noticed, indicating a washout. Decision to stop circulating and pull back to find the wash out. AVG gas was 84 units, Max Gas was 159 Units @ 15395' MD AVG ROP was 127 ft/hr, Max ROP 267 ft/hr @ 16279' MD Metal from Ditch Magnets 0.5 oz, **Metal from G&I 1.3 Ibs. Colville: 16128' MD, 6915' TVD Avg Gas 55 Units Max Gas 166 Units CLYST : 100% gry-dkgry, ncalc, cly grdg to slty, mod hd-hd, mstly pity, sme blky, tr spin, tr carb specs. Page 4 DAIRY OF EVENTS BP EXPLORATION -NORTHSTAR NS33 PB1 26th Feb 2007 Finish POOH while continuing to look for where the washout. Found it in a non magnetic drill collar. Currently laying down the BHA. 27th Feb 2007 Made up BHA, RIH, Cut and Slip Drill line. Circulated at the shoe, then continued to RIH. 28th Feb 2007 Continue to RIH, Start circulating around 14900' MD, wash through and continue to wash to bottom. Drill with difficulty F/16449' - T/16508' MD. Pumped 2 pills while drilling and ROP's picked up. Circulate 1 B/U then pull to Short Trip 9 Stands without incident, RIH, Circulate 5X B/U. Lost power several times today. No trip gas noted. AVG gas was 17 units, Max Gas was 24 Units @ 16508' MD AVG ROP was 112 ft/hr, Max ROP 138 ft/hr @ 16472' MD Metal from Ditch Magnets:.01 Metal from G&I 1 Ib. 1st Mar 2007 Continue to Circulate until 5 B/U was reached. Begin POOH and pulling without tight spots. 2"d Mar-8th Mar 2007 Off Island 9th Mar 2007 Nipple up BOPs 10th Mar 2007 Pipe management. Run in hole to 6382 ft. Circ. out LSND mud at this depth with seawater. Seawater to surface. Fill trip tank with seawater and pooh. 11th Mar 2007 Pick up BHA. Test Schlumberger tools. Continue RIH. 12th Mar 2007 RIH with drilling assembly to 16349 ft. Pump 60 bbls seawater spacer with Safe Surf O followed by 95 bbls of LVT 200 base oil followed by 50 bbls of MOBM thickened with HRP. Displace well to MOBM. Set storm packer in preporation to test BOP'S. ~, , 13th Mar 2007 Test BOPS;Test casing to 2500 psi OK.. Drilling cement start 1530hrs. Drilled cement and shoe track, conducted F.I.T, 1220 psi with an EMW of 12.5 ppg. Drilled F/16508'-T/16553' AVG gas was 3 units, Max Gas was 5 Units @ 16510' MD III' AVG ROP was 45 ft/hr, Max ROP 150 ft/hr @ 16520' MD 14th Mar 2007 Drilled ahead and couldn't tell whether rhino reamer had opened or not, ' Pulled back and swapped pump liners to 5.5 inch. While drilling, torque fluctuated as high as 40 kft/Ibs. Also experienced severe slipstick. Decision was made to POOH. Metal from Ditch Magnets: 7.5 oz, Total for Run 8.5 oz 1 Drilled ahead F/16553' - T/16730' AVG gas was 11 units, Max Gas was 27 Units @ 16670' MD AVG ROP was 76 ft/hr, Max ROP 150 ft/hr @ 16614' MD ' 15th Mar 2007 Continue to POOH, BHA looked okay, Shallow Tested Reamer. OK, Remake BHA with reamer up further on the drill string.. Currently Servicing Top Drive and slip and cut drill line. ' Page 5 DAIRY OF EVENTS BP EXPLORATION - NORTHSTAR NS33 PB1 16th Mar 2007 Running in the hole 17th Mar 2007 Start drilling and started seeing Torq fluctuations right away. Samples heavy with glass beads. No Trip Gas at bottoms up. Drilled F/16730'-T/17368' AVG gas was 40 units, Max Gas was 53 Units @ 16908' MD AVG ROP was 61 ft/hr, Max ROP 116 ft/hr @ 16819' MD Metal from Ditch Magnets:8.6 OZ., Total 17.1 oz 18th Mar 2007 Drilling ahead, experiencing intermittent high torq while drilling. Pulled back 1 stand and circulated. Down for repairs on pump 1, Repaired, RIH and started drilling again. Experiencing intermittent pressure spikes to 4500 PSI. Drilled F/17368'-T/18065' AVG gas was 47 units, Max Gas was 107 Units @ 17879' MD AVG ROP was 73 ft/hr, Max ROP 209 ft/hr @ 16819' MD Metal from Ditch Magnets: 5.8 oz., Total 22.9 oz 19th Mar 2007 Drilling ahead, experiencing intermittent high torq while drilling 25-50k. Experiencing intermittent pressure spikes to 4500 PSI. Drilled F/18065'-T/18810' ' AVG gas was 46 units, Max Gas was 72 Units @ 18241' MD AVG ROP was 52 ft/hr, Max ROP 139 ft/hr @ 18570' MD Metal from Ditch Magnets: 3.8 OZ., Total 26.7 oz 20~' Mar 2007 Drilling ahead, experiencing intermittent high torq while drilling 25-50k. Experiencing intermittent pressure spikes to 4500 PSI. Drilled F/18810'-T/19721' AVG gas was 67 units, Max Gas was 166 Units @ 19156' MD AVG ROP was 68 ft/hr, Max ROP 172 ft/hr @ 18842' MD Metal from Ditch Magnets: 1.6 OZ., Total 28.3 oz 21St Mar 2007 Drilled ahead to 20579' MD 8314' TVD, still experiencing intermittent high torq while drilling 25-50k also experiencing intermittent pressure spikes to 4500 PSI. Drilled F/19721'-T/20579' I' AVG gas was 57 units, Max Gas was 91 Units @ 20382' MD AVG ROP was 62 ft/hr, Max ROP 126 ft/hr @ 20109' MD Metal from Ditch Magnets: 0.0 OZ., Total 28.3 oz 22"d Mar 2007 Circulating 4 Bottoms Up, then POOH to 14700 ft, Service Top Drive, Cut & Slip Drill line. 23~d Mar 2007 Finish cutting & slipping drilline, RIH with no problems. Circulated 1 ' Bottoms up with 200 units of TG. Begin drilling ahead. At 20650' MD, Gamma increased and Siltone increased to 35% in samples, torque also increased when entering into this part of the formation. Decided to Circulate 2X BU to see if torque can be reduced. ' Drilled F/20579'-T/20921' AVG gas was 57 units, Max Gas was 148 Units @ 20580' MD AVG ROP was 40 ft/hr, Max ROP 100 ft/hr @ 20881' MD Page 6 DAIRY OF EVENTS BP EXPLORATION -NORTHSTAR NS33 PB1 24th Mar 2007 Tagged bottom with not much change in Torq. Still running between 20- 40 Kft/Ibs. Currently drilling ahead, Samples were silty for a while but turned back to Claystone. Shales are starting show in sample. Drilled F/20922' - T/21504 AVG gas was 62 units, Max Gas was 148 Units @ 21476' MD AVG ROP was 43 ft/hr, Max ROP 118 ft/hr @ 21405' MD Metal from Ditch Magnets: 0.1 OZ., Total 29.4 oz 25th Mar 2007 Drilling ahead, HRZ came in 137 ft TVD earlier than prognosed. Weighted mud system up to 10.2 ppg. Added steellube and torque has dropped to steady 30-32 kft/Ibs. Abundant pieces of tuff in samples. Drilled F/21504 - T/22358 AVG gas was 144 units, Max Gas was 330 Units @ 21886' MD AVG ROP was 77 ft/hr, Max ROP 186 ft/hr @ 22175' MD HRZ: 21610' MD, 8623' ND, Avg Gas 98 Units Max Gas 181 Units j CLYST : 20% dk gry, gry/brn, calc, cly grdg to slty, sft-hd, blky, pity, fis ip. hydturg, tr carb specs. SLTST : 25% gy; v f gr; sub rnd; mod srt; Ise, fri; p cmtd; cmb„ tr mic pyr nods. ' SH : 45% and gry, gry/brn, tr calc, Ise, fri, blky, ang, splint, sft -hd, hydphyl. TF : 10% xfn xln, wh, blu/wht, brtl, flky. Kalubik 21777' MD, 8680' TVD Avg Gas 82 Units Max Gas 144 Units SLTST : 25% and-dk gry, blky, slty grdg to vfn sd, sme tf ip, ncalc, carb specs. TF : 5% wh-blu, tn, sft, blky SH : 70%gry-dk gry, gry/brn ip, ncalc, sft-hd, fis, blky, splin, tr of mic pyr nods. Metal from Ditch Magnets: 5.2 OZ., Total 34.6 oz 26th Mar 2007 Drilled ahead. Looking at the gamma Kuparuk "C" looked good but there was no show gas, Samples were mostly shale and siltstone, Observed higher amonts than normal of tuffacious material and glaucanite. Sandstone that was there was very fine grading to siltstone, very argillaceous and unconsolidated, No Shows were observed. No connection gas was seen. Currently POOH to test BOPs. Drilled F/22358' - T/23237' MD AVG gas was 121 units, Max Gas was 329 Units @ 22947' MD AVG ROP was 72 ft/hr, Max ROP 260 ft/hr @ 23017' MD Kuparuk 22420' MD, 8905' TVD, Avg Gas 118 Units Max Gas 367 Units SLTST : It gy, brn; v f gr; sub rnd; mod srt; sft; p cmtd„ tr tf. SH : gy, dk gy; sli slty; mod hd, sft; cmb, blky, ang; hydphyl, ncalc. Kuparuk "C" 23003' MD, 9115' TVD SH: 45% gry-dkgry, brn, sli calc, slty, sft-frm, hd ip, blky, ang, tr pyr, abndt glauc. SLTST: 30% It gy, brn; v f gr; sub rnd, sub ang; p srt, mod srt; Ise, sft; p cmtd; cmb, blky. SST: 25%, clr, trnsl-trnsp, It-md brn, of-fn gr, v arg, sbang-sbrnd, pr srt, uncons, nsnf . Metal from Ditch Magnets: 2.8 OZ., Total 37.4 oz 27th Mar 2007 Continue Circulating, started POH for BOP test. Tight spot at 19936, Pulled up to just below the shoe, circulated to clean the casing and lower up drag. Metal from Ditch Magnets: 4.3 OZ., Total 41.7 oz Page 7 DAIRY OF EVENTS BP EXPLORATION -NORTHSTAR NS33 PB1 28t" Mar 2007 Continue to circulate below the shoe, till cuttings reduced over shakers, Pulled up into the casing, tested BOP's, Currently Slipping and Cutting Drill Line and servicing top drive. Metal from Ditch Magnets: 4.3 OZ., Total 41.7 oz 29t" Mar 2007 Finish Slipping & Cutting ,RIH, Worked through Tight Spot at 16920' MD, Reamed and circulated to clean the hole further, 1700 hrs, Start RIH to 21,700, Currently circulating at that depth 03/30/2007 at 2:38 AM Trip Gas peaked at 485 Units. Metal from Ditch Magnets: 8.1 OZ., Total 49.8 oz 30t" Mar 2007 Circulating to clean hole. Samples from circulation show no apparent sloughing, just cuttings. Predominantly Shale and siltstone. Metal from Ditch Magnets: 1.6 OZ., Total 51.4 oz 31 Mar 2007 Side tracked, could not enter original hole. Decision to continue and re-drill NS33, This well became NS33 PB1 GEOLOGIST FORMATION TOPS "SS" =Approx. - 56.6 feet from TVD MD TVD TVD SS TOP OF PERMAFROST 1229 1179 1122.4 BASE OF PERMAFROST 1622 1576 1519.4 SV6 4052 3057 3000.4 SV5 4838 3307 3250.4 SV4 5752 3613 3556.4 SV3 6420 3840 3783.4 SV2 6920 3998 3941.4 SV1 8141 4386 4329.4 UGNU 9245 4736 4679.4 SCHRADER BLUFF 14085 6265 6208.4 COLVILLE 16128 6915 6858.4 HRZ 21610 8623.15 8566.55 KALUBIK 21777 8680 8623.4 Kuparuk "D" 22340 8887 8830.4 Kuparuk "C" 23003 9115 9058.4 Page 8 PB-2 ' DAIRY OF EVENTS BP EXPLORATION - NORTHSTAR NS33 PB2 ' 31St March 2007 Start NS33 PB2 by re-entering side track at 21,828' .Wash to tag bottom at 21900. Drilling ahead. Lithology is following pretty close to NS33 PB1. ' Drilling F/21900' T/22118' AVG gas was 96 units, Max Gas was 181 Units @ 21696' MD AVG ROP was 118 ft/hr, Max ROP 186 ft/hr @ 21911' MD 1St Anri12007 Drilling F/22118' T/22755', to just the top of Kuparuk "C", Circulating to clean the hole. RPM's are up to 150, TRQ 30 kft/lb. Samples are looking great and hole is cleaning well. Cuttings are larger and a significant increase, is observed coming across the shakers. Kuparuk "D" came in 18 ft higher than NS33 PB 1. AVG gas was 78 units, Max Gas was 106 Units @ 22499' MD AVG ROP was 54 ft/hr, Max ROP 108 ft/hr @ 22480' MD Metal from Ditch Magnets: 4.0 OZ., Tota157.5 oz HRZ: 21610' MD, 8623' TVD, Kalubik 21777' MD, 8680' TVD, Kuparuk 22340' MD, t 8887 TVD Kuparuk; 22340' MD, 8887' TVD, Avg Gas 79 Units, Max Gas 106 Units Shale: 70%: gry-md gry, dk gry ip, tr calc, sil ip, fri, and hd-v hd, pred bllcy, fis, no swing, tr pyr & mic ' inoc, sme slty imbds. Siltstone : 20%: It gy, gy; v f gr; sub rnd; mod srt; mod hd; p cmtd, mod w cmtd. Tuff : 10%: crm, bl; mod hd; blky. 2"a Apri12007 Finished Circulating 3 B/U, Hole cleaned real good. Continue Drilling F/22756', T/23230' md, Top Drive went down for an hour, Drilling ahead at report time. Cuttings still looking good, No shows in the Kuparuk "C" or "A". Sands were very glaucinated in the "C" ,and silty in the "A" with no visable porosity. Metal from Ditch Magnets: 4.0 OZ., Total 61.5 oz AVG gas was 164 units, Max Gas was 367 Units @ 22889' MD AVG ROP was 47 ft/hr, Max ROP 115 ft/hr @ 23090' MD Kuparuk "C" 22820' MD, 9115' TVD, Avg Gas 181 Units, Max Gas 339 Units SST : It gy, crm, brn; m gr, f gr; sub spher; sub ang; p srt, mod srt; trnsp, trnsl; lse, fri, sft; p cmtd„ tr glauc. SLTST : It gy, gy; v f gr; sub rnd; mod srt; mod hd; mod w cmtd. SH : gy, dk gy; sli slty; fri, mod hd; brit, blky„ tr pyr. TF : fxln, wh-bf, tr grn, hd- vhd, predm blky, sme plty Kuparuk "A" 23078' MD, 9240' TVD, AVG Gas 188 units, Max Gas 298 Units SLTST : to-lt brn, gry/brn ip, v fin gr sd grdng to slt, pred qtz, sb rnd, frm-md hd, and w-w cmt, sil cmt, tr glauc & pyr, Fluor masked by mobm, cut slw, dul yel. SST : It gy, to ip, vf-fn, sb spher, sb rnd, p srt, pred qtz, clr-trnsl, sd grdg to slt, sil cmt, sft-frm, m w cmtd. SH :brn-dk brn, ncalc, fri, frm-v hd, blky, fis, lam, no styling, tr slty imbds . 3ra Apri12007 Continue Drilling F/23230', stopping to repair Stand Pipe Pressure, start drilling to end of 12 %4" hole section, 23460' md. Circulating 6 x BU. Monitoring cuttings coming back on the shakers. Second wave came through between the third and fouth BU. Cuttings continued to diminish after the 4th BU, down to 25% of what they were. By the end of circulation gas was down to 30 units. Metal from Ditch Magnets: 1.1 OZ., Total 62.6 oz Page 1 DAIRY OF EVENTS BP EXPLORATION - NORTHSTAR NS33 PB2 ' 4t" Apri12007 Continue to POOH, Pulling tight around 18390', RIH and circulate dry job out, Very little cuttings coming across the shakers, Back reamed 5 stds then CBU, ' currently working through tight spot at 17600' and Metal from Ditch Magnets: 1.6 OZ., Tota164.2 oz ' St" Apri12007 Continue POOH and circulating. Monitoring cuttings every half hour. Cuttings have diminished to around 10% and are very, very finely ground. Metal from Ditch Magnets:.8 OZ., Tota165 oz 6t" Anri12007 Back reaming from 18500' back to 17160', started to packoff, lost some mud to formation when packed off. Continue to back ream at reduced pump rate to prevent opening reamer. Replace swivel packing Virtually no cuttings coming across the shakers. Metal from Ditch Magnets: 0 OZ., Total 65 oz 7t" Apri12007 Back reaming to shoe, Pull reamer into shoe, pulled tight, RIH one stand. Circulating B/LT, samples throughout the day have been pasty in composition, Metal from Ditch Magnets: 0 OZ., Total 65 oz 8t" Apri12007 At 01:30 am, an increase in cuttings is observed coming across the shakers. Cuttings were soft, grey silty clay, fine-very fine cuttings, sub rounded to well rounded. Metal from Ditch Magnets: 0 OZ., Tota165 oz 9t" Anri12007 Continue to POOH, Lay Down BHA#9, Pick up BHA # 10, RIH for clean out run lOt" Apri12007 RIH, Currently testing BOPS llt" Anri12007 Finish testing BOP's, circulate and wash to shoe, CBU until casing was cleaned, tripped in hole to 16735, started taking weight, POOH to shoe and wash to bottom without rotating 12t" - 25`" Apri12007 Off Island 26t"- 29t" Apri12007 Rig down till next drill season 30t" April-May 5t" 2007 Off Island Page 2 DAIRY OF EVENTS BP EXPLORATION - NORTHSTAR NS33 PB2 GEOLOGIST FORMATION TOPS "SS" =Approx. - 56.6 feet from TVD MD TVD TVD SS HRZ 21610 8623.15 8566.55 KALUBIK 21777 8680 8623.4 Kuparuk "D" 22340 8887 8830.4 Kuparuk "C" 22820 9115 9058.4 Kuparuk "A" 23080 9241 9184.4 Page 3 Customer: B P Exploration Report No : 1 " . ~ '~ ~' . . . Well: NS33 Date: 1/29/2007 Sperry drilling ser..~ces Area: Beaufort Sea Depth 874 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 874 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: J. RaIIIR. Watkins Current Avg 24 hr Max R.O.P. 173 ft/hr 174 ft/hr ( 831 ft/hr @ 221 ) Gas* 0 units 0 unit: ( 1 units @ 850 ) Sample Quality ~X Good ~ Fair ~ Poor Pump and Flow Data RIH Pumps 130 spm Flow rate 650 gpm Pump Capacity 4.9 gps Pump Liner & Strk 6.5x12 in. Pump Pres 2100 psi z Mud Wt In 9.10 ppg Visc 185 secs API felt nc ml HTHP ml Mud Wt at Max Gas 9.0 ppg Mud Wt Out 9.10 ppg PV 12 cP YP 69 Ibs/100ft2 Gels 17 \ 21 \ 24 MBT pH 9.0 Sd Bit No.: 1 Type: MXC1 Bit Size: 16 Jets: 1 x 12 3 x 20 x TFA: 1.0310 Wt On Bit: 0-5 RPM: 0 Hrs. On Bit: 5.0 Total Revs on Bit: Footage for Bit Run 874 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: %Cly 50 %Sltst %SD 50 %Sh Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Drillin ahead, No as to record. Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Sperry drilling Services Mudlogger's Morning Report _ -- Customer: B.P. Exploration Well: NS33 Area: Beaufort Sea Lease: North Star Is. Rig: Nabors 33E Job No.: AK-AM-4888594 Report No.: 2 Date: 1 /30/2007 Depth 2502 Footage Last 24 hrs: 1628 Rig Activity: Drilling Report For: M. DingerlR. Watkins Current Avg 24 hr Max Pump and Flow Data RIH R.O.P. 173 ft/hr 125 ft/hr ( 843 ft/hr @ 2033 ) Pumps 130 spm Flow rate 650 gpm Gas* 25 units 22 unit: ( 69 units @ 2302 ) Pump Capacity 4.9 gps Pump Liner & Strk 6.5x12 in. Sample Quality ~X Good ~ Fair ~ Poor Pump Pres 2100 psi Mud Wt In 9.30 ppg Visc 185 secs API felt nc ml HTHP ml Mud Wt at Max Gas 9.0 ppg Mud Wt Out 9.30 ppg PV 12 cP YP 69 Ibs/100ft2 Gels 17 \ 21 \ 24 MBT pH 9.0 Sd Bit No.: 1 Type: MXC1 Bit Size: 16 Jets: 1 x 12 3 x 20 _x TFA: 1.0310 Wt On Bit: 0-35 RPM: 0 Hrs. On Bit: 18.0 Total Revs on Bit: Footage for Bit Run 2502 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: %Cly 50 %Sltst %SD 40 %Lig 10 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg Depth to _ to _ to _ to to to GAS PEAKS Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 24 hr Recap Drilling ahead, No gas to record. Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Sperry drilling Services Mudlogger's Morning Report Customer: B.P. Exploration Well: NS33 Area: Beaufort Sea Lease: North Star Is. Rig: Nabors 33E Job No.: AK-AM-4888594 Report No.: 3 Date: 1 /31 /2007 Depth 4175 Footage Last 24 hrs: 1673 Rig Activity: Drilling Report For: M. DingerlR. Watkins Current Avg 24 hr Max Pump and Flow Data R.O.P. 85 ft/hr 152 ft/hr ( 668 ft/hr @ 4012 ) Pumps 180 spm Flow rate 915 gpm Gas* 3 units 15 unit: ( 74 units @ 2757 ) Pump Capacity 4.9 gps Pump Liner & Strk 6.5x12 in. Sample Quality ~X Good ~ Fair ~ Poor Pump Pres 2100 psi Mud Wt In 9.30 ppg Visc 173 secs API felt 9.0 ml HTHP ml Mud Wt at Max Gas 9.3 ppg Mud Wt Out 9.30 ppg PV 23 cP YP 58 Ibs/100ft2 Gels 27 \ 34 \ 36 MBT ### pH 8.6 Sd 0.75 Bit No.: 1 Type: MXC1 Bit Size: 16 Jets: 1 x 12 3 x 20 x TFA: 1.0310 Wt On Bit: 0-35 RPM: 0 Hrs. On Bit: 29.0 Total Revs on Bit: _ Footage for Bit Run 4175 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: %Cly 80 %Sltst %SD 20 %Lig 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg Depth to _ to to ~_ to to to ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 24 hr Recap Drillin ahead. Gas has been prett linear, no peaks to report. Samples have been sand till 4100'. After 4100' heav cla s. Est Top of Permafrost 1212' MD, 1190' TVD ,fi Est Bottom of Permafrost 1570' MD, 1529' TVD Est SV6 4050' md, 3058' tvd ,Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B Exploration Report No : 4 P . . . Well: NS33 Date: 2/1 /2007 Sperry drilling ser..~ces Area: Beaufort Sea Depth 4487 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 312 Rig: Nabors 33E Rig Activity: P/U Hole opener Job No.: AK-AM-4888594 Report For: M. Dinger/R. Watkins Current Avg 24 hr Max R.O.P. 0 ft/hr 90 ft/hr ( 207 ft/hr @ 4354 ) Gas* 0 units 7 unit: ( 13 units @ 2757 ) Sample Quality QX Good ~ Fair ~ Poor Pump and Flow Data Pumps 0 spm Flow rate 0 gpm Pump Capacity 4.9 gps Pump Liner & Strk 6.5x12 in. Pump Pres 0 psi s.ex~2 in. Mud Wt In 9.10 ppg Visc 178 secs API felt 8.0 ml HTHP ml Mud Wt at Max Gas 9.1 ppg Mud Wt Out 9.10 ppg PV 22 cP YP 58 Ibs/100ft2 Gels 25 \ 35 \ 41 MBT 15 pH 8.6 Sd 0.75 Bit No.: 3 Type: Hole Opener Bit Size: 21 Jets: 3 x 24 0 x 0 x TFA: 1.3250 Wt On Bit: 0.00 RPM: 0 Hrs. On Bit: 27.0 Total Revs on Bit: Footage for Bit Run 4487 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip Ci: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: 100%Cly %Sltst %SD %Lig 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg . GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Finished drilling 16" section, circulated 4 bottoms up to Clean hole, no problems POOH, LD BHA, Est Top of Permafrost 1212' MD, 1190' TVD Est Bottom of Permafrost 1570' MD, 1529' TVD Est SV6 4050' md, 3058' tvd Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 5 . . . Well: NS33 Date: 2/2/2007 Sperry Drilling se~..~~es Area: Beaufort Sea Depth 4487 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: -2764 Rig: Nabors 33E Rig Activity: Reeming Hole Job No.: AK-AM-4888594 .Report For: M. DingerlR. Watkins Current Avg 24 hr Max R.O.P. 0 ft/hr 445 ft/hr ( ft/hr @ ) Gas"` 7 units 7 unit: ( 13 units @ 2757 ) Sample Quality ~X Good ~ Fair ~ Poor Pump and Flow Data Pumps 200 spm Flow rate 990 gpm Pump Capacity 4.9 gps Pump Liner & Strk 6.5x12 in. Pump Pres 1100 psi 6.5x12 in. Mud Wt In 9.10 ppg Visc 158 secs API felt 7.4 ml HTHP ml Mud Wt at Max Gas 9.1 ppg Mud Wt Out 9.10 ppg PV 23 cP YP 58 Ibs/100ft2 Gels 26 \ 41 \ 49 MBT 16 pH 8.6 Sd 0.5 Bit No.: 3 Type: Hole Opener Bit Size: 21 Jets: 3 x 24 0 x 0 x TFA: 1.3250 Wt On Bit: 30.00 RPM: 80 Hrs. On Bit: 6.2 Total Revs on Bit: Footage for Bit Run 2764 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 25000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: 75%Cly %Sltst %SD 25 %Lig 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to ~~' ,_e __ _ .s 24 hr Recap Reemin with 21" Hole o ener, Keepin stead ro ress to kee uide pilot in hole. Swivel packin leaked around 1700 ft, Repaired, continuin to reem ahead Est Top of Permafrost 1212' MD, 1190' TVD Est Bottom of Permafrost 1570' MD, 1529' TVD Est SV6 4050' md, 3058' tvd Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 6 '~~~~~``~~`~ ~ ~'~~ ~' ~' '` . . . Well: NS33 Date: 2/3/2007 Sperry Drilling se~..~~es Area: Beaufort Sea Depth 4487 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: R/U For Casing Job No.: AK-AM-4888594 Report For: M. Dinger/R. Watkins ; Current Avg 24 hr Max R.O.P. 0 ft/hr fUhr ( ft/hr @ ) Gas" units unit; ( units @ ) Sample Quality ~X Good ~ Fair ~ Poor Pump and Flow Data Pumps spm Flow rate gpm Pump Capacity 4.9 gps Pump Liner & Strk 6.5x12 in. Pump Pres psi 6.5x12 in. Mud Wt In 9.20 ppg Visc 60 secs API felt 6.8 ml HTHP ml Mud Wt at Max Gas 9.2 ppg Mud Wt Out 9.20 ppg PV 16 cP YP 34 Ibs/100ft2 Gels 17 \ 31 \ 37 MBT 16.5 pH 8.6 Sd 0.5 . Bit No.: Type: Hole Opener Bit Size: Jets: x 0 x 0 _x TFA: Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 25000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: 100 %Sltst %SD 0 %Lig 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to ~ ~~~~~~~~~ ~ ~~ ~~ ~ ~ ~ ~~~~ ~~~~~~~~ ~~~~ 24hr Reca Finish Reemin with 21" Hole o ever, POOH, LD BHA, Ri m up to p p run casin Est Top of Permafrost 1212' MD, 1190' TVD Est Bottom of Permafrost 1570' MD, 1529' TVD Est SV6 4050' md, 3058' tvd Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 7 -- - ' `'' ~ d . . . Well; NS33 Date: 2/4/2007 Sperry Drilling Services Area: Beaufort Sea Depth 4487 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: RIH W/16" Casing Job No.: AK-AM-4888594 Report For: M. DingerlR. Watkins Current Avg 24 hr Max R.O.P. 0 ft/hr ft/hr ( ft/hr @ ) Gas* units unit: ( units @ ) Sample Quality ~X Good ~ Fair ~ Poor Pump and Flow Data Pumps spm Flow rate gpm Pump Capacity 4.9 gps Pump Liner & Strk 6.5x12 in. Pump Pres psi 6.5x12 in. Mud Wt In 9.40 ppg Visc 178 secs API felt 7.0 ml HTHP ml Mud Wt at Max Gas 9.2 ppg Mud Wt Out 9.40 ppg PV 27 cP YP 70 Ibs/100ft2 Gels 35 \ 56 \ 65 MBT 16.5 pH 8.6 Sd 0.5 Bit No.: Type: Bit Size: Jets: x 0 x 0 x TFA: Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 24000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: 100 %Sltst %SD 0 %Lig 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to .._._ ~R.~~;., b ... 24 hr Recap RIH with 16" casin , pumpin off and on to get casin down. Est Top of Permafrost 1212' MD, 1190' TVD Est Bottom of Permafrost 1570' MD, 1529' TVD Est SV6 4050' md, 3058' tvd Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air , Sperry drilling Services Mudlogger's Morning Report Customer: B.P. Exploration Well: NS33 Area: Beaufort Sea Lease: North Star Is. Rig: Nabors 33E Job No.: AK-AM-4888594 Report No.: 8 Date: 2/5/2007 Depth 4487 Footage Last 24 hrs: 0 Rig Activity: RIH W/16" Casing Report For: M. DingerlR. Watkins Current Avg 24 hr Max Pump and Flow Data R.O.P. 0 ft/hr ft/hr ( ft/hr @ ) Pumps 100 spm Flow rate 406 gpm Gas* 1 units 2 unit; ( units @ 3 ) Pump Capacity 4.9 gps Pump Liner & Strk 6x12 in. Sample Quality ~X Good ~ Fair ~ Poor Pump Pres psi 6x12 in. Mud Wt In 9.50 ppg Visc 202 secs API felt 7.0 ml HTHP ml Mud Wt at Max Gas 9.5 ppg Mud Wt Out 9.50 ppg PV 28 cP YP 69 Ibs/100ft2 Gels 38 \ 70 \ 83 MBT 16.5 pH 8.6 Sd 0.5 IBit No.: Type: Bit Size: Jets: x 0 x 0 x TFA: Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 24000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: 100 %Cly %Sltst %SD 0 %Lig 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg Depth to _ to _ to _ to to to Gas in units Max Background GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot 24 hr Recap Continue to RIH with 16" casing, At 3495' casing stuck,( Nothing unusal in the formation was noted that showed anv potential problems) Was able to work casing free, circluted to for a while, now continueina to run casino. Est SV6 4050' md, 3058' tvd I I Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Sperry drilling Services Mudlogger's Morning Report Customer: B.P. Exploration Well: NS33 Area: Beaufort Sea Lease: North Star Is. Rig: Nabors 33E Job No.: AK-AM-4888594 Report No.: 9 Date: 2/6/2007 Depth 4487 Footage Last 24 hrs: 0 Rig Activity: R/U Cmnt Eq Report For: M. DingerlR. Watkins Current Avg 24 hr Max Pump and Flow Data R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 0 spm Flow rate 0 gpm Gasp 0 units 0 unit: ( 0 units @ 0 ) Pump Capacity 4.9 gps Pump Liner & Strk 6x12 in. Sample Quality ~X Good ~ Fair ~ Poor Pump Pres psi sx12 in. Mud Wt In 9.20 ppg Visc 65 secs API felt 7.0 ml HTHP ml Mud Wt at Max Gas 9.5 ppg Mud Wt Out 9.20 ppg PV 17 cP YP 29 Ibs/100ft2 Gels 16 \ 45 \ 83 MBT 20 pH 8.9 Sd 0.5 Bit No.: Type: Bit Size: Jets: x 0 x 0 _x TFA: Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 24000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: 100 %Cly %Sltst %SD 0 %Lig 0 Connection Gas and Mud Cut ft units ppg ft ft units ppg ft ft units ppg ft ft units ppg ft units units units units ppg ppg ppg ppg ft units ft units ft units ft units ppg ppg ppg ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot to to to to to to C5 Tot _ .: T,MwGs~ ~-r.=r ~JtlAeaw n.-'s re•~~, ~r~.~ ~ 24 hr Recap Continue to wash/run casing into the hole. Tight spot @ casing to bottom. Rig down casing equipment. Currently rigging up 3881', worked pipe through and continue to cement equipment. Est SV6 4050' md, 3058' tvd Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 10 ~~ ~~ ~ ~''"' ' `'" s ~ `'~' Well: . . NS33 . Date: 2/7/2007 Sperry Drilling ser..~ces Area: Beaufort Sea Depth 4487 Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: POOH Job No.: AK-AM-4888594 Report For: M. Dinger/X. Chacin Mudlogger's Morning Report Current Avg 24 hr Max Pump and Flow Data R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 0 spm Flow rate 0 gpm Gas* 0 units 0 unit: ( 0 units @ 0 ) Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. Sample Quality ~X Good ~ Fair ~ Poor Pump Pres psi 6x12 in. f- Mud Wt In 9.20 ppg Visc 58 secs API felt 7.5 ml HTHP ml Mud Wt at Max Gas 9.2 ppg Mud Wt Out 9.20 ppg PV 20 cP YP 29 Ibs/100ft2 Gels 13 \ 19 \ 25 MBT 17 pH 8.0 Sd 0.25 Bit No.: Type: Bit Size: Jets: x 0 x 0 x TFA: Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 22000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft ;urrent Lithology: 100 %Cly %Sltst %SD 0 %Lig 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg _ ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to ~. /' tV {cm's 4. K4 $.1ea4PlN~ w,i'- 24Fhr Recap Completed cementing 16" casing as per well plan. With full returns back. POOH at report time. No gas was observed at Bottoms up Est SV6 4050' md, 3058' tvd Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air ~{ Cust xploration Report No : 91 ~~ ~ . Well: NS33 Date: 2/12/2007 Sperry Drilling ser..ices Area: Beaufort Sea Depth 4487 Y udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: Test BOPS Job No.: AK-AM-4888594 Report For: M. Dinger/X. Chacin Current Avg 24 hr Max R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas" 0 units 0 unit; ( 0 units @ 0 ) Sample Quality ~X Good ~ Fair ~ Poor Pump and Flow Data Pumps 0 spm Flow rate 0 gpm Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. Pump Pres psi 6x12 in. .; Mud Wt In 9.20 ppg Visc 58 secs API felt 7.5 ml HTHP ml Mud Wt at Max Gas 9.2 ppg Mud Wt Out 9.20 ppg PV 20 cP YP 29 Ibs/100ft2 Gels 13 \ 19 \ 25 MBT 17 pH 8.0 Sd 0.25 Bit No.: Type: Bit Size: Jets: x 0 x 0 x TFA: Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 22000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: 100 %Cly %Sltst %SD 0 %Lig 0 ,.-; Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Testin BOP's Est SV6 4050' md, 3058' tvd Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Sperry Drilling Services Mudlogger's Morning Report . ~ Customer: B.P. Exploration Well: NS33 Area: Beaufort Sea Lease: North Star Is. Rig: Nabors 33E Job No.: AK-AM-4888594 Report No.: 12 Date: 2/13/2007 Depth 5848 Footage Last 24 hrs: 1360.8 Rig Activity: RIH Report For: M. DingerlX. Chacin Current Avg 24 hr Max Pump and Flow Data R.O.P. 91 ft/hr 129 ft/hr ( 352 ft/hr @ 5372 ) Pumps 0 spm Flow rate 0 gpm Gas" 15 units 9 unit; ( 27 units @ 5794 ) Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. ,~,` Sample Quality QX Good ~ Fair ~ Poor Pump Pres psi 6x12 in. Mud Wt In 8.90 ppg Visc 90 secs API felt 7.0 ml HTHP ml Mud Wt at Max Gas 8.9 ppg Mud Wt Out 8.90 ppg PV 12 cP YP 27 Ibs/100ft2 Gels 11 \ 15 \ 17 MBT 0 pH 9.1 Sd 0 Bit No.: 4 Type: Hycalog/PDC Bit Size: 12 1/4 Jets: 7 x 12 3 x 10 x TFA: 1.0030 Wt On Bit: 39208.00 RPM: Hrs. On Bit: 10.5 Total Revs on Bit: Footage for Bit Run 1361 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 22000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: 100 %Cly %Sltst %SD 0 %Lig 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg _ft units ppg ft units ppg ft units ppg _ft units ppg ft units ppg ft units ppg Depth _ to _ to _ to _ to _ to to Gas in units Max Background GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot ~,... _ H.,-.,w _~-..,. ,.. ..,,. 24 hr Recap Finish testing BOP's, P/U BHA, RIH with single stands, cut and slip drill line, test Est SV6 4050' md, 3058' tvd Logging Engineer: Mark Lindloff/Robert Havefield '` 10000 units = 100% Gas In Air ~r Customer: B P Exploration Report No : 13 ~° ` '~~'~'' ~ '°`°''{~ Well: . . NS33 . Date: 2/14/2007 Sperry Grilling sBr..ioes Area: Beaufort Sea Depth 5848 Lease: North Star Is. Footage Last 24 hrs: 1360.8 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: M. Dinger/X. Chacin Mudlogger's Morning Report s,..,~,:, _ ~,, ,. ~ ~ ,~~.<< : ~ ._ ~ ,. ,~, ~ .- 4... :~ ~,.~-.. _..n •~~... ~ -_. y.... ` .',Say., 4i1F~3/f.3 Current Avg 24 hr Max Pump and Flow Data R.O.P. 91 ft/hr 129 ft/hr ( 352 ft/hr @ 5372 ) Pumps 220 spm Flow rate 925 gpm Gas" 15 units 9 unit; ( 27 units @ 5794 ) Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. Sample Quality ~X Good ~ Fair ~ Poor Pump Pres 1750 psi 6x12 in. Mud Wt In 9.30 ppg Visc 71 secs API felt 4.0 ml HTHP ml Mud Wt at Max Gas 9.3 ppg Mud Wt Out 9.30 ppg PV 16 cP YP 28 Ibs/100ft2 Gels 8 \ 15 \ 19 MBT 10 pH 9.0 Sd 0.25 Bit No.: 4 Type: Hycalog/PDC Bit Size: 12 1/4 Jets: 7 x 12 3 x 10 x TFA: 1.0030 Wt On Bit: 5-6 RPM: 160 Hrs. On Bit: 10.5 Total Revs on Bit: Footage for Bit Run 1361 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 25000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: %Cly 40 %Sltst 50 %SD 10 %Lig 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Test casin to 2500 psi for 30 minutes. RIH to drill out shoe track. FIT to 11.5 pp .Drill ahead 14.75" hole. Est SV5 4845' md, 3310' tvd (Logging Engineer: Mark Lindloff/Robert Haverrield Sperry Drilling Services Mudlogger's Morning Report Customer: B.P. Exploration Well: NS33 Area: Beaufort Sea Lease: North Star Is. Rig: Nabors 33E Job No.: AK-AM-4888594 Report No.: 14 Date: 2/15/2007 Depth 7767 Footage Last 24 hrs: 1819 Rig Activity: Drilling Report For: M. DingerlX. Chacin Current Avg 24 hr Max Pump and Flow Data R.O.P. 182 ft/hr 110.8 ft/hr ( 436 ft/hr @ 6039 ) Pumps 230 spm Flow rate 969 gpm Gas* 90 units 83 unit: ( 247 units @ 6567 ) Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. Sample Quality ~X Good ~ Fair ~ Poor Pump Pres 1734 psi 6x12 in. Mud Wt In 9.30 ppg Visc 62 secs API felt 4.6 ml HTHP ml Mud Wt at Max Gas 9.3 ppg Mud Wt Out 9.30 ppg PV 13 cP YP 26 Ibs/100ft2 Gels 9 \ 17 \ 21 MBT 10 pH 8.9 Sd 0.25 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 20000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: %Cly 10 %Sltst 0 %SD 90 %Lig 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg Depth to _ to _ to _ to to to ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 24 hr Recap Drilling Ahead Est SV4 5755.80' md, 33615.00' tvd SV3 6420' MD, 3840' TVD SV2 6914.20' MD, 4001' TVD Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air , Customer: B x loration Re o 15 p p _ ~ ,~; ~~ s d ~_~~~ ~t . 33 Well: NS Date: 2 /16/2007 Sperry Drilling ser..ices Area: Beaufort Sea Depth 9823 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 2056 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: M. DingerlX. Chacin Current Avg 24 hr Max R.O.P. 180 ft/hr 128.5 ft/hr ( 412 ft/hr @ 8153 ) Gas* 33 units 75 unit: ( 164 units @ 8184 ) Sample Quality ~X Good ~ Fair ~ Poor Pump and Flow Data Pumps 230 spm Flow rate 969 gpm Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. Pump Pres 2002 psi 6x12 in. Mud Wt In 9.40 ppg Visc 71 secs API felt 4.0 ml HTHP ml Mud Wt at Max Gas 9.4 ppg Mud Wt Out 9.40 ppg PV 16 cP YP 32 Ibs/100ft2 Gels 18 \ 26 \ 29 MBT 14 pH 8.9 Sd 1 Bit No.: 4 Type: Hycalog/PDC Bit Size: 12 1/4 Jets: 7 x 12 3 x 10 x TFA: 1.0030 Wt On Bit: 11.00 RPM: 160 Hrs. On Bit: 44.5 Total Revs on Bit: Footage for Bit Run 5236 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 24000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: %Cly %Sltst 10 %SD 90 %Lig 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to ., ., . ,, , a . , r. . A... ,., 24 hr Recap Drilling Ahead, Est SV1 8136.38' md, 4390' tvd Ugnu 9238.13' MD, 4740.00' TVD - Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air 1 Customer: B P Exploration Report No : 16 ~' ~'~'°' ` ~~ ~'~~ '`"' ~ ~ . . . Well: NS33 Date: 2/17/2007 Sperry Grilling se~..~~es Area: Beaufort Sea Depth 10362 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 539 Rig: Nabors 33E Rig Activity: RIH Job No.: AK-AM-4888594 Report For: M. Dinger/X. Chacin Current Avg 24 hr Max R.O.P. 0 ft/hr 117 ft/hr ( 283 ft/hr @ 10047 ) Gas* 0 units 44 unit; ( 133 units @ 10223 ) Sample Quality QX Good ~ Fair ~ Poor Pump and Flow Data Pumps 0 spm Flow rate 0 gpm Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. Pump Pres o psi 6x12 in. Mud Wt In 9.40 ppg Visc 68 secs API felt 4.5 ml HTHP ml Mud Wt at Max Gas 9.4 ppg Mud Wt Out 9.40 ppg PV 14 cP YP 33 Ibs/100ft2 Gels 15 \ 22 \ 25 MBT 14 pH 8.8 Sd 0.5 Bit No.: 4 Type: Hycalog/PDC Bit Size: 12 1/4 Jets: 7 x 12 3 x 10 x TFA: 1.0030 Wt On Bit: 0.00 RPM: 0 Hrs. On Bit: 49.1 Total Revs on Bit: Footage for Bit Run 5775 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 22000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: %Cly %Sltst 10 %SD 90 %Lig 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to T .. ,. .~~ ~ .~ _,.w~ ~,, _ ~ ~~,. ...-. _~. :. .;,ri. 24 hr Recap Drifted ahead to short trip point, circulated 4 B/U with no gas to speak of. POOH to 7300' MD, RIH to 7600, Circulated, then POOH to shoe with no problems. Est SV1 8136.38' md, 4390' tvd Ugnu 9238.13' MD, 4740.00' TVD Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air ,• Customer: B P : 17 Exploration Report No " ' ' ~" w''`~' ' ~~~ ~ . . . Well: NS33 Date: 2/18/2007 Sperry Grilling ser..ioes Area: Beaufort Sea Depth 11660 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 1298 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: J. Rall/X. Chacin Current Avg 24 hr Max R.O.P. 40 ft/hr 93 ft/hr ( 425 ft/hr @ 11161 ) Gas" 37 units 50 unit: ( 278 units @ 11584 ) Sample Quality ^X Good ~ Fair ~ Poor Pump and Flow Data Pumps 230 spm Flow rate 974 gpm Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. Pump Pres 2338 psi 6x12 in. . Mud Wt In 9.40 ppg Visc 68 secs API felt 4.3 ml HTHP ml Mud Wt at Max Gas 9.4 ppg Mud Wt Out 9.40 ppg PV 13 cP YP 34 Ibs/100ft2 Gels 17 \ 22 \ 26 MBT 15 pH 8.9 Sd 0.25 Bit No.: 4 Type: Hycalog/PDC Bit Size: 12 1/4 Jets: 7 x 12 3 x 10 _x TFA: 1.0030 Wt On Bit: 5-15 RPM: 80-160 Hrs. On Bit: 63.0 Total Revs on Bit: Footage for Bit Run 7073 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 22000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Clay %Sltst 10 % SD 30 % Coal 60 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to ..: ,,, ~ ..-~~ . ,5_ ~. ,..., ....~,, ~ <.4 ~-;gig,,,., _~ . 24 hr Recap Finish running in the hole with no problems, Drillin ahead at report time. Noted at 11570' md, 5480' TVD RKB, a 30' and coal bed. Metal from Ditch Magnets 4.5 oz, *~Metal from G&I 25 Ibs. * Note G&I's metal may have been there for a couple of days, It has been emptied and will be included in the daily weights. Currently drilling in the Ugnu Logging Engineer: Mark LindlofF/Robert Haverfield 10000 units = 100% Gas In Air Customer: B : 18 P Exploration Report No _ .~::Z -5 .~"~+"~ " . . . Well: NS33 Date: 2/19/2007 Sperry Grilling se.-..~~es Area: Beaufort Sea Depth 12177 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 517 Rig: Nabors 33E Rig Activity: POOH Job No.: AK-AM-4888594 Report For: J. Rall/X. Chacin Current Avg 24 hr Max R.O.P. 0 ft/hr 72 ft/hr ( 349 ft/hr @ 11812 ) Gas'' 0 units 48 unit; ( 105 units @ 11970 ) Sample Quality QX Good ~ Fair ~ Poor Pump and Flow Data Pumps 236 spm Flow rate 967 gpm Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. Pump Pres 2285 psi sx12 in. Mud Wt In 9.40 ppg Visc 69 secs API felt 4.0 ml HTHP ml Mud Wt at Max Gas 9.4 ppg Mud Wt Out 9.40 ppg PV 14 cP YP 36 Ibs/100ft2 Gels 18 \ 25 \ 27 MBT 15 pH 8.8 Sd 0.25 Bit No.: 4 Type: Hycalog/PDC Bit Size: 12 1/4 Jets: 7 x 12 3 x 10 _x TFA: 1.0030 Wt On Bit: 5-15 RPM: 136 Hrs. On Bit: 70.2 Total Revs on Bit: Footage for Bit Run 7590 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 2400 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Clay %Sltst 30 % SD 70 % Coal Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Drillin ahead, encountered hard strin ers off and on. Rota Steerable failed to respond to commands, Decided to POOH and change Rotary Steerable. Pulled up a few stands, CBU 4 times, RIH and circulate 2 more times, then POOH, No trip gas was observed at B/U. POOH at report time. Daily Weights: Metal from Ditch Magnets 3 oz, Metal from G&I 5 Ibs. Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Sperry Drilling Service! Mudlogger's Morning Report a~.~. Customer: B.P. Exploration Well: NS33 Area: Beaufort Sea Lease: North Star Is. Rig: Nabors 33E Job No.: AK-AM-4888594 ;.~ Report No.: 19 Date: 2/20/2007 Depth 12177 Footage Last 24 hrs: 0 Rig Activity: Testing BOP's Report For: J. Rall/R. Watkins/ J.Leblanc Current Avg 24 hr Max Pump and Flow Data R.O.P. 0 ft/hr ft/hr ( ft/hr @ ) Pumps spm Flow rate gpm Gas* 0 units unit: ( units @ ) Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. "' Sample Quality ~X Good ~ Fair ~ Poor Pump Pres psi 6x12 in. ,,~ Mud Wt In 9.30 ppg Visc 65 secs API felt 4.5 ml HTHP ml Mud Wt at Max Gas 9.3 ppg Mud Wt Out 9.30 ppg PV 13 cP YP 38 Ibs/100ft2 Gels 15 \ 21 \ 25 MBT 14 pH 9.0 Sd 0.1 Bit No.: Type: Sit Size: Jets: x x x TFA: Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: 0 Short Trip Depth ft Short Trip Gas: Tight Spots: to to Mud Cut: Mud Cut: to ppg Trip CI: 25000 _ppg Short Trip CI: Feet of Fill on Bottom: ppm ppm ft Current Lithology: % Clay %Sltst 30 % SD 70 % Coal Connection Gas and Mud Cut ft units ppg _ ft units ppg _ ft units ppg _ ft units ppg Depth to _ to _ to _ to to to ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot . . = T, 24 hr Recap Pooh.Ti ht spot at 10500ft md. Rih 3 stands and circulate B/U, ..Continue to pooh Continue to pooh without incident. Out of hole 1800 hrs. Stabilizers under auge, 11.5". Rig up to test BOP's. Daily Weights: No metal from the ditch magnets today, no drilling. Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air . •n.y+nh.'. cN1:~+n'tu a.r ,. _ ~.x-:4"yt'~9191h~~Cf~f"'I ~y~~k _ `~~R.i', +~t4'Atk ,` Customer: B P Exploration Report No : 20 ~~~a ~.F - . ~~~~~•``~'`~'- ~ . . . Well: NS33 Date: 2/21 /2007 Sperry Drilling ser..ices Area: Beaufort Sea Depth 12177 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: PU BHA ^ Job No.: AK-AM-4888594 Report For: J. Rall/R. Watkins/ J.Leblanc Current Avg 24 hr Max R.O.P. 0 ft/hr ft/hr ( ft/hr @ ) Gas* 0 units unit: ( units @ ) Sample Quality QX Good ~ Fair ~ Poor Pump and Flow Data Pumps spm Flow rate gpm Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. Pump Pres psi 6x12 in. ' Mud Wt In 9.30 ppg Visc 65 secs API felt 4.6 ml HTHP ml Mud Wt at Max Gas 9.3 ppg Mud Wt Out 9.30 ppg PV 13 cP YP 38 Ibs/100ft2 Gels 15 \ 22 \ 25 MBT 14 pH 8.8 Sd 0.1 Bit No.: Type: Bit Size: Jets: x x x TFA: Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 25000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Clay %Sltst 30 % SD 70 % Coal Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to ~.... E.. _ ,,... _ , .. 24 hr Recap Tested BOP's, Pick Up BHA, Start RIH. Daily Weights: No metal from the ditch magnets today, no drilling. ` Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air ~ r Customer: B P : 21 Exploration Report No ~ ~ 1~ -~' .,~T . I . . . Well: NS33 Date: 2/22/2007 Sperry Drilling ser..ioes Area: Beaufort Sea Depth 12337 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 160 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: J. Rall/J. LeBlanc R. Watkins Current Avg 24 hr Max R.O.P. 135 ft/hr 174 ft/hr ( 444 ft/hr @ 12291 ) Gas"' 11 units 10 unit; ( 17 units @ 12192 ) Sample Quality QX Good ~ Fair ~ Poor Pump and Flow Data Pumps 230 spm Flow rate 950 gpm Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. Pump Pres 2338 psi sx12 in. , Mud Wt In 9.40 ppg Visc 64 secs API felt 4.6 ml HTHP ml Mud Wt at Max Gas 9.4 ppg Mud Wt Out 9.40 ppg PV 13 cP YP 30 Ibs/100ft2 Gels 10 \ 17 \ 19 MBT 15 pH 8.6 Sd 1 Bit No.: 5 Type: Hycalog/PDC Bit Size: 12 1/4 Jets: 7 x 12 3 x 10 x TFA: 1.0030 Wt On Bit: 10 RPM: 160 Hrs. On Bit: 3.5 Total Revs on Bit: Footage for Bit Run 160 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 25000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Clay %Sltst 20 % SD 60 % Coal 10 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Continue to RIH to shoe, Cut and slip Drill line, Continue to RIH, Washed down last 2 stands. Drilling ahead at report time. Metal from Ditch Magnets 3.4 oz, "*Metal from G&I 20 Ibs. * Note G&I cleaned their Process One tank, May account for the metal. It was a lot of what looked like pipe scale. daily weights. Currently drilling in the Ugnu Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 22 .`°'~t..a " "~"°°~ . . . Well: NS33 Date: 2/23/2007 Sperry Grilling se~..~~es Area: Beaufort Sea Depth 13965 udlogger's Morning Report ,~~ Lease: North Star Is. Footage Last 24 hrs: 1628 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: J. Rall/J. LeBlanc R. Watkins u;~ Current Avg 24 hr Max R.O.P. 0 ft/hr 102 ft/hr ( 417 ft/hr @ 12587 ) Gas* 19 units 24 unit: ( 43 units @ 13857 ) Sample Quality ~X Good ~ Fair ~ Poor Pump and Flow Data Pumps 225 spm Flow rate 921 gpm Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. Pump Pres 2338 psi 6x12 in. Mud Wt In 9.40 ppg Visc 65 secs API felt 4.6 ml HTHP ml Mud Wt at Max Gas 9.4 ppg Mud Wt Out 9.40 ppg PV 12 cP YP 39 Ibs/100ft2 Gels 14 \ 19 \ 23 MBT 17 pH 8.2 Sd 0.25 Bit No.: 5 Type: Hycalog/PDC Bit Size: 12 1/4 Jets: 7 x 12 3 x 10 x TFA: 1.0030 Wt On Bit: 18 RPM: 160 Hrs. On Bit: 19.5 Total Revs on Bit: Footage for Bit Run 1788 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 24000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Clay 10 %Sltst 50 % SD 40 % Coal 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Drilling ahead Metal from Ditch Magnets 1.8 oz, "*Metal from G&I 3 Ibs. daily weights. Currently drilling in the Ugnu Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 23 ~ ..,,. ~ i .F a'sll . . . Well: NS33 Date: 2/24/2007 Sperry Grilling ser..ioes Area: Beaufort Sea Depth 15381 udlogger's Morning Report _ .y= ; ~ Lease: North Star Is. Footage Last 24 hrs: 1416 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: J. RaIIIJ. LeBlanc R. Watkins ~ ~.~~..~,. ~ . a.~ ,~ _~~sr Current Avg 24 hr Max R.O.P. 79 ft/hr 129 ft/hr ( 377 ft/hr @ 14746 ) Gases 78 units 62 unit; ( 153 units @ 15357 ) Sample Quality ~ Good ~ Fair Q Poor ~ Horrible Pump and Flow Data Pumps 220 spm Flow rate 930 gpm Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. Pump Pres 2274 psi 6x12 in. Mud Wt In 9.40 ppg Visc 70 secs API felt 4.1 ml HTHP ml Mud Wt at Max Gas 9.4 ppg Mud Wt Out 9.40 ppg PV 12 cP YP 41 Ibs/100ft2 Gels 17 \ 22 \ 27 MBT 15 pH 8.4 Sd 0.25 Bit No.: 5 Type: Hycalog/PDC Bit Size: 12 1/4 Jets: 7 x 12 3 x 10 _ x TFA: 1.0030 Wt On Bit: 17 RPM: 160 Hrs. On Bit: 36.0 Total Revs on Bit: Footage for Bit Run 3204 .. ~ ~ .. ...-_ .,. .~~~ ,,,~:--~ .~. w, Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 24000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Clay 40 %Sltst 50 % SD 10 % Coal 10 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Drillin ahead Metal from Ditch Magnets 1 oz, '*Metal from G&I 5 Ibs. Schrader Bluff 14081' MD, 6265' TVD Currently drilling in the Schrader Bluff Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 24 i~_X~~.~'' ' ' ~'"~ '~~~° ~~ `°'`'` a Well: . . NS33 . Date: 2/25/2007 Sperry Drilling se~..~~es Area: Beaufort Sea Depth 16449 Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: L/D BHA Job No.: AK-AM-4888594 Report For: J. Rall/J. LeBlanc Mudlogger's Morning Report R. Watkins Current Avg 24 hr Max Pump and Flow Data R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 0 spm Flow rate 0 gpm Gas* 0 units 0 unit: ( 0 units @ 0 ) Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. Sample Quality ~ Good ~ Fair ~ Poor x^ Horrible Pump Pres 0 psi 6x12 in. Mud Wt In 9.40 ppg Visc 66 secs API felt 4.2 ml HTHP ml Mud Wt at Max Gas 9.4 ppg Mud Wt Out 9.40 ppg PV 13 cP YP 39 Ibs/100ft2 Gels 16 \ 22 \ 26 MBT 14 pH 8.8 Sd 0.1 Bit No.: 5 Type: Hycalog/PDC Bit Size: 12 1/4 Jets: 7 x 12 3 x 10 _x TFA: 1.0030 Wt On Bit: 0 RPM: 0 Hrs. On Bit: 50.4 Total Revs on Bit: Footage for Bit Run 4272 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trrp Ct: 24000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Clay 40 %Sltst 60 % SD 0 % Coal 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg Depth _ to _ to _ to _ to to GAS PEAKS Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to 24 hr Recap Drilling Ahead with no difficulties but for a few hard stringers. At 16449' and a drop in SPP was noticed, indicating a washout. Decision to stop circulating and pull back to find the wash out Metal from Ditch Magnets 0.5 oz, "Metal from G&I 1.3 Ibs. Colville: 16128' MD, 6915' TVD I Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air I ~F t 9 ^~etR*w~ F~ Customer: B P Exploration Report No : 25 Well: . . NS33 . Date: 2/26/2007 Sperry Grilling s@r-v~~es Area: Beaufort Sea Depth 16449 Lease: North Star Is. ~ Footage Last 24 hrs: 1068 Rig: Nabors 33E Rig Activity: L/D BHA Job No.: AK-AM-4888594 Report For: J. Rall/J. LeBlanc Mudlogger's Morning Report R. Watkins Current Avg 24 hr Max Pump and Flow Data R.O.P. 0 ft/hr 127 ft/hr ( 267 ft/hr @ 16279 ) Pumps 0 spm Flow rate 0 gpm Gas* 0 units 84 unit: ( 159 units @ 15395 ) Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. Sample Quality ~ Good ~ Fair ~ Poor x^ Horrible Pump Pres 0 psi 6x12 in. l Mud Wt In 9.30 ppg Visc 62 secs API felt 4.0 ml HTHP ml Mud Wt at Max Gas 9.3 ppg Mud Wt Out 9.30 ppg PV 10 cP YP 28 Ibs/100ft2 Gels 12 \ 15 \ 18 MBT 13 pH 8.7 Sd tr Bit No.: 5 Type: Hycalog/PDC Bit Size: 12 1/4 Jets: 7 x 12 3 x 10 x TFA: 1.0030 Wt On Bit: 0 RPM: 0 Hrs. On Bit: 50.4 Total Revs on Bit: Footage for Bit Run 4272 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 24000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Clay 40 %Sltst 60 % SD 0 % Coal 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Finish POOH while continuin to look for where the washout wasat. Found it in a non ma netic drill collar. Current) la in down the BHA. Metal from Ditch Magnets: No metal today. Colville: 16128' MD, 6915' TVD Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: Exploration B P Report No : 26 ~"~ ®' ~ - - - -~ 1 Well: . . NS33 . Date: 2/27/2007 Sperry Drilling ser..ioes Area: Beaufort Sea Depth 16449 Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: RIH Job No.: AK-AM-4888594 Report For: M. Dinger/J. LeBlanc Mudlogger's Morning Report R. Watkins Current Avg 24 hr Max Pump and Flow Data R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 0 spm Flow rate 0 gpm Gas* 0 units 0 unit: ( 0 units @ 0 ) Pump Capacity 4.2 gps Pump Liner & Strk 6x12 in. Sample Quality ~ Good ~ Fair ~ Poor x^ Horrible Pump Pres 0 psi 6x12 in. ~. Mud Wt In 9.30 ppg Visc 61 secs API felt 4.4 ml HTHP ml Mud Wt at Max Gas 9.3 ppg Mud Wt Out 9.30 ppg PV 13 cP YP 34 Ibs/100ft2 Gels 13 \ 17 \ 22 MBT 13 pH 9.1 Sd tr Bit No.: 6 Type: Hycalog/PDC Bit Size: 12 1/4 Jets: 7 x 12 3 x 10 x TFA: 1.0030 Wt On Bit: 0 RPM: 0 Hrs. On Bit: 50.4 Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 21000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ ppg Short Trip C!: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Cla y 40 %Sltst 60 % SD 0 % Coal 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to ' to 24 hr Recap Made up BHA, RIH, Cut and Slip Drill line. Circulated at the shoe, then continued to RIH. Currently RIH. Metal from Ditch Magnets: No metal today. Est Colville: 16200' MD, 693' TVD Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 27 Well: . . NS33 . Date: 2/28/2007 Sperry drilling se~..~~es Area: Beaufort Sea Depth 16508 Lease: North Star Is. Footage Last 24 hrs: 58 Rig: Nabors 33E Rig Activity: Circulating Job No.: AK-AM-4888594 Report For: M. Dinger/J. LeBlanc Mudlogger's Morning Report R. Watkins Current Avg 24 hr Max Pump and Flow Data Flow rate 1025 gpm R.O.P. 0 ft/hr 112 ft/hr ( 138 ft/hr @ 16472 ) Pumps 230 spm 4.2 gps Gas* 4 units 17 unit; ( 24 units @ 16508 ) Pump Capacity 6x12 in. Pump Liner & Strk 6x12 in. Sample Quality ~ Good ~ Fair ~ Poor Q Horrible Pump Pres 2220 psi 6.5x12 in. ~, Mud Wt In 9.50 ppg Visc 60 secs API felt 4.6 ml HTHP ml Mud Wt at Max Gas 9.5 ppg Mud Wt Out 9.50 ppg PV 12 cP YP 38 Ibs/100ft2 Gels 14 \ 18 \ 22 MBT 15 pH 8.7 Sd tr Sit No.: 6 Type: Hycalog/PDC Bit Size: 12 1/4 Jets: 7 x 12 3 x 10 x TFA: 1.0030 'Vt On Bit: 8 RPM: 130-150 Hrs. On Bit: 51.0 Total Revs on Bit: _ Footage for Bit Run 58 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 22000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Clay 40 %Sltst 60 % SD 0 % Coal 0 ~, Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg Depth to _ to _ to _ to to to GAS PEAKS Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 24 hr Recap Continue to RIH, Start circulatin around 14900' MD, wash throu hand continue to wash to bottom. Drill with difficult to 16508' MD. Pumped 2 pills while drillin and ROP's picked u .Circulate 1 B/U then pull to Short Trip 9 Stands without incident, RIH, Circulate 5X B/U. Lost power several times today. No trip gas noted. Metal from Ditch Magnets:.01 Metal from G&I 1 Ib Est Colville: 16200' MD, 693' TVD Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 28 ,., . . . Well: NS33 Date: 3/1/2007 Sperry Grilling ser.aces Area: Beaufort Sea Depth 16508 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: POOH Job No.: AK-AM-4888594 Report For: M. Dinger/J. LeBlanc R. Watkins ~~,,., -~~- ,..r,_ . ~,...~ , .~ Current Avg 24 hr Max R.O.P. 0 ft/hr ft/hr ( ft/hr @ ) Gas" units unit: ( units @ ) Sample Quality ~ Good ~ Fair ~ Poor x^ Horrible Pump and Flow Data Flow rate gpm Pumps spm 4.2 gps Pump Capacity 6x12 in. Pump Liner & Strk 6x12 in. Pump Pres psi 6.5x12 in. " , Mud Wt In 9.40 ppg Visc 51 secs API felt 4.6 ml HTHP ml Mud Wt at Max Gas 9.4 ppg Mud Wt Out 9.40 ppg PV 11 cP YP 33 Ibs/100ft2 Gels 11 \ 13 \ 17 MBT 13 pH 8.4 Sd tr Bit No.: 6 Type: Hycalog/PDC Bit Size: 12 1/4 Jets: 7 x 12 3 x 10 _x TFA: 1.0030 Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: 22000 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Clay 40 %Sltst 60 % SD 0 % Coal 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Continue to Circulate until 5 B/U was reached. Begin POOH and pulling without tight spots. Metal from Ditch Magnets: No metal from Magnets today. Metal from G&I Ib Est Colville: 16200' MD, 693' TVD Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration _. Report No : 29 ~~'~~'~~~~ Well: . . NS33 . Date: 3/13/2007 Sperry ori~~ir,g ser..iaes Area: Beaufort Sea Depth 16552 Lease: North Star Is. Footage Last 24 hrs: 44 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: J Rall/ X Chacin Mudlogger's Morning Report J. Rocket Current Avg 24 hr Max Pump and Flow Data Flow rate 523 gpm R.O.P. 34 ft/hr 45 ft/hr ( 150 ft/hr @ 16520 ) Pumps 125 spm 4.2 gps Gas* 4 units 3 unit: ( 5 units @ 16510 } Pump Capacity 6x12 in. Pump Liner & Strk 6x12 in. Sample Quality ~ Good ~ Fair ~ Poor ~ Horrible Pump Pres psi 6.5x12 in. r~ Mud Wt In 9.10 ppg Visc 101 secs POM 1.3 ml HTHP 3.6 ml Mud Wt at Max Gas 9.1 ppg Mud Wt Out 9.10 ppg PV 23 cP YP 22 Ibs/100ft2 Gels 24 \ 33 \ 0 ES 701'.0 Sd Bit No.: 7 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 ' Wt On Bit: 4 RPM: 140 Hrs. On Bit: 1.0 Total Revs on Bit: Footage for Bit Run 44 V.~ Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ ppg Short Trip CI: ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Clay 40 %Sttst 60 % SD 0 % Coal 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg Depth to _ to _ to _ to to to GAS PEAKS Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 24 hr Recap Test BOP's, Test Casing to 2500 PSI, Drill out cemenet and shoe track, Perform FIT test to 1220 psi With an EMW of 12.5 ppg, Drill to 16553' MD. Metal from Ditch Magnets: 1 OZ. Metal from G&I No Metal Ib Est Colville: 16200' MD, 6938' TVD Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 30 ~° .~`t"°t"'~ ``~ Well: . . NS33 . Date: 3/14/2007 Sperry drilling ser..ioas Area: Beaufort Sea Depth 16730.13 Lease: North Star Is. Footage Last 24 hrs: 178 Rig: Nabors 33E Rig Activity: POOH Job No.: AK-AM-4888594 Report For: J Ral1/ X Chacin Mudlogger's Morning Report J. Rocket .r .._ .. ~ ., f_ . ~ _ ~ti,, -- , ,- Current Avg ~ 24 hr Max Pump and Flow Data Flow rate gpm R.O.P. 0 ft/hr 76 ft/hr ( 150 ft/hr @ 16614 ) Pumps 0 spm 3.5 gps Gas"` 0 units 11 unit: ( 27 units @ 16670 ) Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Sample Quality ~X Good ~ Fair ~ Poor ~ Horrible Pump Pres psi 6.5x12 in. Mud Wt In 9.20 ppg Visc 96 secs POM 2.7 ml HTHP 3.4 ml Mud Wt at Max Gas 9.2 ppg Mud Wt Out 9.20 ppg PV 24 cP YP 21 Ibs/100ft2 Gels 24 \ 33 \ 34 ES 881.0 Sd Bit No.: 7 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 0 RPM: 0 Hrs. On Bit: 4.7 Total Revs on Bit: _ Footage for Bit Run 222 .. _ Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Salt: 26 ppm Short Trip Depth ft Short Trip Gas: --Mud Cut: _ ppg CI: 42000 ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: aaystone 95 %Sltst 5 % SD 0 % Coal 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Drilled ahead and couldn't tell whether rhino reamer had opened or not, Pulled back and swap ed pump liners to 5.5 inch. Drilled ahead to 16730.13, while drilling, torque fluctuated as high as 40 kft/Ibs. Also experienced severe slipstick. Decision was made to POOH. Metal from Ditch Magnets: 7.5 OZ., Total for Run 8.5 oz Metal from G&I No Metal Ib Colville: 16128' MD, 6915' TVD Logging Engineer: Mark Lindloff/Robert Haventeld 10000 units = 100% Gas fn Air I Cust : 32 xploration Report No ~~ ~~~ ~ ~~~xa'~°s. ~ ~ ~ . Well: NS33 Date: 3/16/2007 Sperry drilling Ser..ioes Area: Beaufort Sea Depth 16730.13 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: RIH Job No.: AK-AM-4888594 Report For: J Rall/ X Chacin J. Rocket Current Avg 24 hr Max R.O.P. 0 ft/hr ft/hr ( ft/hr @ ) Gas" 0 units unit: ( units @ ) Sample Quality QX Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate gpm Pumps 0 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres psi 6.5x12 in. Mud Wt In 9.20 ppg Visc 98 secs POM 1.8 ml HTHP 3.4 ml Mud Wt at Max Gas 9.2 ppg Mud Wt Out 9.20 ppg PV 25 cP YP 20 Ibs/100ft2 Gels 19 \ 26 \ 28 ES 790.0 Sd Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 0 RPM: 0 Hrs. On Bit: 4.7 Total Revs on Bit: Footage for Bit Run 0 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Salt: 26.75 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 42000 ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Claystone 95 %Siltstone 5 % SD r Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Runnin in the hole Metal from Ditch Magnets:0 OZ., Total for Run 0 oz Metal from G&I No Metal Ib Currently drilling in the Colville Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Cust : 32 x loration Report No p ~-l~.ILt~;3R.~~"Ir~P~ . Well: NS33 Date: 3/16/2007 Sperry drilling se~..~~es Area: Beaufort Sea Depth 16730.13 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: RIH Job No.: AK-AM-4888594 Report For: J Rall/ X Chacin J. Rocket ,~-. ,~~,:f .~__ ,.. , w ,_ ._~ ,-, .,.. 5 ~ ~ _~ _ ,, Current Avg 24 hr Max R.O.P. 0 ft/hr ft/hr ( ft/hr @ ) Gases 0 units unit: ( units @ ) Sample Quality ~X Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate gpm Pumps 0 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres psi 6.5x12 in. Mud Wt In 9.20 ppg Visc 98 secs POM 1.8 ml HTHP 3.4 ml Mud Wt at Max Gas 9.2 ppg Mud Wt Out 9.20 ppg PV 25 cP YP 20 Ibs/100ft2 Gels 19 \ 26 \ 28 ES 790.0 Sd Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 0 RPM: 0 Hrs. On Bit: 4.7 Total Revs on Bit: Footage for Bit Run 0 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Salt: 26.75 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 42000 ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Claystone 95 %Siltstone 5 % SD is Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Runnin in the hole Metal from Ditch Magnets:0 OZ., Total for Run 0 oz Metal from G&I No Metal Ib Currently drilling in the Colville Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B Exploration Report No : 33 P . . . Well: NS33 Date: 3/17/2007 Sperry drilling ser..ioes Area: Beaufort Sea Depth 17368 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 638 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: J Rall/ X Chacin J. Rocket Current Avg 24 hr Max R.O.P. 44 ft/hr 61 ft/hr ( 116 ft/hr @ 16819 ) Gas"` 47 units 40 unit: ( 53 units @ 16908 ) Sample Quality ~X Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate 825 gpm Pumps 234 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres 3868 psi 6.5x12 in. ` Mud Wt In 9.40 ppg Visc 96 secs POM 1.7 ml HTHP 3.0 ml Mud Wt at Max Gas 9.4 ppg Mud Wt Out 9.40 ppg PV 23 cP YP 20 Ibs/100ft2 Gels 29 \ 31 \ 38 ES 1060.0 Sd Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 _ x TFA: 0.7780 Wt On Bit: 14 RPM: 120 Hrs. On Bit; 12.0 Total Revs on Bit: Footage for Bit Run 638 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Salt: 27.67 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 44000 ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Claystone 100 %Siltstone 0 % SD 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to , ~; 24 hr Recap Start drilling and started seein Torq fluctuations right away. Samples heav with glass beads. No Tri Gas at bottoms up. Metal from Ditch Magnets:8.6 OZ., Total 17.1 oz Currently drilling in the Colville Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B Exploration Report No : 34 P ~~.~~~~~ ' ~~ ~' . . . Well: NS33 Date: 3/18/2007 Sperry ori~~ing ser..ioes Area: Beaufort Sea Depth 18065 : udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 700 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: J Rall/ X Chacin J. Rocket _ ,n . ~._ _. ~. ~ ,_: r , .r -. ~., ~ _ .:, .__ Current Avg 24 hr Max R.O.P. 54 ft/hr 73 ft/hr ( 209 ft/hr @ 17383 ) Gas* 63 units 47 unit: ( 107 units @ 17879 ) Sample Quality ~X Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate 842 gpm Pumps 240 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres 3868 psi 5.5x12 in. Mud Wt In 9.40 ppg Visc 81 secs POM 1.7 ml HTHP 2.9 ml Mud Wt at Max Gas 9.4 ppg Mud Wt Out 9.40 ppg PV 20 cP YP 19 Ibs/100ft2 Gels 29 \ 36 \ 49 ES 971.0 Sd Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 _x TFA: 0.7780 Wt On Bit: 21 RPM: 120 Hrs, On Bit: 22.0 Total Revs on Bit: Footage for Bit Run 1338 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Salt: 27.21 pprn Short Trip Depth ft Short Trip Gas: Mud Cut: ppg CI: 43000 ppm Tight Spots: to to to ~ Feet of Fill on Bottom: ft Current Lithology: % Claystone 100 %Siltstone 0 % SD 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Drilling ahead, experiencin intermittent hi h torq while drillin .Pulled back 1 stand and circulated Down for repairs on ump 1, Repaired, RIH and started drilling again. Experiencin intermittent pressure spikes to 4500PS1. Metal from Ditch Magnets: 5.8 OZ., Total 22.9 oz Currently drilling in the Colville Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air , . .. : 35 Customer: B Exploration Report No P ~ L.. ~ ~ d,.! ll~'~ . . . Well: NS33 Date: 3/19/2007 Sperry Drilling ser..ioes Area: Beaufort Sea Depth 18810 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 745 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: J Rall/ X Chacin J. Rocket ,,~. .... . , -.~,_ .. _. . , , .,,., ~ w. .. .. ~ . Current Avg 24 hr Max R.O.P. 40 ft/hr 52 ft/hr ( 139 ft/hr @ 18570 ) Gas* 33 units 46 unit: ( 72 units @ 18241 ) Sample Quality QX Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate 842 gpm Pumps 240 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres 3616 psi 5.5x12 in. Mud Wt In 9.40 ppg Visc 83 secs POM 2.2 ml HTHP 2.9 ml Mud Wt at Max Gas 9.4 ppg Mud Wt Out 9.40 ppg PV 17 cP YP 18 Ibs/100ft2 Gels 28 \ 31 \ 39 ES 1191.0 Sd Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 34 RPM: 109 Hrs. On Bit: 37.0 Total Revs on Bit: Footage for Bit Run 2083 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Salt: 2.86 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg CI: 47000 ppm Tight Spots: to to to ~ Feet of Fill on Bottom: ft ~._, , _ . . ~;.~., ,,.N,_. .~- ,.~, .. . ~.us,, , ., Current Lithology: % Claystone 70 %Siltstone 30 % SD p i Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to .~ . .. _. 24 hr Recap Drilling ahead, experiencin intermittent high torq while drillin 25-50k. Experiencin intermittent ressure spikes to 4500 PSI. Metal from Ditch Magnets: 3.8 OZ., Total 26.7 oz Currently drilling in the Colville Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air J Customer: B P Exploration Report No : 36 ''`''~~ "`{"'~~ . . . Well: NS33 Date: 3/20/2007 Sperry drilling servioes Area: Beaufort Sea Depth 19721 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 911 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: J Rall/ R. Watkins J. LeBlanc Current Avg 24 hr Max R.O.P. 86 ft/hr 68 ft/hr ( 172 ft/hr @ 18842 ) Gas* 58 units 67 unit; ( 166 units @ 19156 ) Sample Quality QX Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate 842 gpm Pumps 240 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres 3616 psi 5.5x12 in. '~ .. Mud Wt In 9.40 ppg Visc 99 secs POM 2.7 ml HTHP 3.0 ml Mud Wt at Max Gas 9.4 ppg Mud Wt Out 9.40 ppg PV 23 cP YP 19 Ibs/100ft2 Gels 29 \ 35 \ 50 ES 1093.0 Sd Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 24 RPM: 109 Hrs. On Bit: 53.0 Total Revs on Bit: Footage for Bit Run 2994 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Salt: 31.49 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 47000 ppm Tight Spots: to to to Feet of Fill on Bottom: ft .~,z.:. .. T~ ~,, Current L.ithology: % Claystone 60 %Siltstone 40 % SD 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Drillin ahead, ex eriencin intermittent hi h torq while drillin 25-50k. Experiencin intermittent pressure spikes to 4500 PSI. Metal from Ditch Magnets: 1.6 OZ., Total 28.3 oz Currently drilling in the Colville Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air _ __ : 37 Customer: B P Exploration Report No °-" HALLIfE3uR~ ilk . . . Well: NS33 Date: 3/21/2007 Sp@rry drilling se~..~~es Area: Beaufort Sea Depth 20579 udlogger's Morning Report ~.._ Lease: North Star Is. Footage Last 24 hrs: 858 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: J Rall/ R. Watkins J. LeBlanc ., ~.r. , . ~ ~. ~~ Current Avg 24 hr Max R.O.P. 68 ft/hr 62 ft/hr ( 126 ft/hr @ 20109 ) Gas* 74 units 57 unit: ( 91 units @ 20382 ) Sample Quality ^X Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate 837 gpm Pumps 240 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres 3616 psi 5.5x12 in. ,~ Mud Wt In 9.40 ppg Visc 106 secs POM 2.1 ml HTHP 3.2 ml Mud Wt at Max Gas 9.4 ppg Mud Wt Out 9.40 ppg PV 23 cP YP 20 Ibs/100ft2 Gels 35 \ 36 \ 50 ES 966.0 Sd Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 5-10 RPM: 120 Hrs. On Bit: 68.0 Total Revs on Bit: Footage for Bit Run 3852 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Salt: 28.00 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 41000 ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Claystone 100 %Siltstone 0 % SD 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Drilled ahead to 20579' MD 8314' TVD, still experiencin intermittent high torq while drillin 25-50k also Experiencing intermittent pressure spikes to 4500 PSI. Metal from Ditch Magnets: 0.0 OZ., Total 28.3 oz Currently drilling in the Colville Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air ._ ... _. ,:..~_ ,. _ r.. Customer: Exploration B P Report No : 38 Hi4.LL1E3iJ~lT®1~l Well: . . NS33 . Date: 3/22/2007 Sperry Drilling sgr.aces Area: Beaufort Sea Depth 20579 Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: Cutting & Slipping Job No.: AK-AM-4888594 Report For: J Rall/ R. Watkins Mudlogger's Morning Report J. LeBlanc .:-_..~.. , ... - v ,.~_..~- , . +n ... ~ e ~ .- ~.n... ~.. ~v. ~' .., v~ ~. . . Current Avg 24 hr Max Pump and Flow Data Flow rate 0 gpm R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 0 spm 3.5 gps Gas" 0 units 0 unit: ( 0 units @ 0 ) Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Sample Quality ~X Good ~ Fair ~ Poor ~ Horrible Pump Pres 0 psi 5.5x12 in. r Mud Wt In 9.90 ppg Visc 107 secs POM 2.5 ml HTHP 3.2 ml Mud Wt at Max Gas 9.4 ppg Mud Wt Out 9.90 ppg PV 22 cP YP 19 Ibs/100ft2 Gels 31 \ 33 \ 47 ES 892.0 Sd Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 0 RPM: 0 Hrs. On Bit: 68.0 Total Revs on Bit: Footage for Bit Run 3852 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Salt: 29.12 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 42000 ppm Tight Spots: to to to Feet of Fill on Bottom: ft Current Lithology: % Claystone 100 %Siltstone 0 % SD 0 i Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg Depth _ to _ to _ to _ to _ to to GAS PEAKS Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 24 hr Recap Finish Circulating 4 Bottoms Up, then POOH to 14700 ft, Service Top Drive, Cut & Slip Drill line.. Metal from Ditch Magnets: 0.0 OZ., Total 28.3 oz Currently drilling in the Colville Logging Engineer: Mark Lindloff/Robert Havefield 10000 units = 100% Gas In Air Customer: B.P. Exploration Report No.: 39 ~„~L~~~~`7' `~ Well: NS33 Date: 3/23/2007 Sperry Drilling se~..~~es Area: Beaufort Sea Depth 20921 Lease: North Star Is. Footage Last 24 hrs: 342 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: J Rall/ R. Watkins Mudlogger's Morning Report J. LeBlanc 7~- b .~,~,. ~, Current Avg 24 hr Max Pump and Flow Data Flow rate 840 gpm R.O.P. 50 fUhr 40 ft/hr ( 100 ft/hr @ 20881 ) Pumps 240 spm 3.5 gps Gas* 26 units 57 unit: ( 148 units @ 20580 ) Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Sample Quality ~X Good ~ Fair ~ Poor ~ Horrible Pump Pres 3798 psi 5.5x12 in. p.. ~~ Mud Wt In 9.40 ppg Visc 82 secs POM 2.2 ml HTHP 3.4 ml Mud Wt at Max Gas 9.4 ppg Mud Wt Out 9.40 ppg PV 20 cP YP 18 Ibs/100ft2 Gels 32 \ 32 \ 40 ES 862.0 Sd Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 6 RPM: 74 Hrs. On Bit: 77.0 Total Revs on Bit: Footage for Bit Run 4194 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Salt: 25.86 ppm Short Trip Depth 14700 ft Short Trip Gas: 200 Mud Cut: 9.5 ppg CI: 39000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft ~.~ ,. , _:.... _ . ~ . _...., ~. ,_,..„... ti: ,. _ ~ ~ . Current Lithology: % Claystone 65 %Siltstone 35 % SD 0 r` Connection Gas and Mud Cut 20634 ft 50 units 9.4 ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg Depth _ to _ to _ to _ to _ to to GAS PEAKS Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 24 hr Recap Finish cuttin & slipping drilline, RIH with no problems. Circulated 1 Bottoms up with 200 units of TG. Be in driltin ahead. At 20650' MD, Gamma increased and Siltone increased to 35% in samples, Torque also increased when entering into this part of the formation. Decided to Circulate 2X BU to see if torque can be reduced. Currently Circulating. Metal from Ditch Magnets: 0.1 OZ., Total 28.4 oz Currently drilling in the Colville Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air : Cush omer: B P Exploration Report No : 40 1_ ' ~ ~~ ®° ~~' y. ~ ' ' ~~'~ . . . Well: NS33 Date: 3/24/2007 Sperry drilling ser..ices Area: Beaufort Sea Depth 21504 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 584 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: J Rall/ R. Watkins J. LeBlanc ;. vim,...:, _- .- aG. ^L` .;r..f........~~a-. r,. E .....,..:..:r,~...,.,..1.. :..f. .. .., Y~'M i..':..F:.'{w:e Current Avg 24 hr Max R.O.P. 80 ft/hr 43 ft/hr ( 118 ft/hr @ 21405 ) Gas" 56 units 62 unit: ( 148 units @ 21476 ) Sample Quality ~X Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate 817 gpm Pumps 236 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres 3798 psi 5.5x12 in. Mud Wt In 9.50 ppg Visc 86 secs POM 1.4 ml HTHP 3.4 ml Mud Wt at Max Gas 9.5 ppg Mud Wt Out 9.50 ppg PV 22 cP YP 20 Ibs/100ft2 Gels 33 \ 35 \ 42 ES 730.0 Sd Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 20 RPM: 74 Hrs. On Bit: 93.5 Total Revs on Bit: Footage for Bit Run 4778 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Salt: 25.36 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: 9.5 ppg CI: 38000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft .,.~~ :e. ,{~: ,,~ ..~:.,,....;.:~. r~~,.~;, ., ;.. ~,~.~eKmv,~ ~... ~.r~~:~..~ ........ ~:~,~~,~ ~._.-.. moo; :. .~; ~~;:.~ . _.. ~~w~ . ->.~~~.... <,~: Current Lithology: % Claystone 65 %Siltstone 35 % SD 0 i Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Tag ed bottom with not much change in Torq.Still running between 20-40 Kft/Ibs Currently drillin ahead, Samples were silty for a while but turned back to Clyst.. Shales are starting show in sample also. Metal from Ditch Magnets: 0.1 OZ., Total 29.4 oz Currently drilling in the Colville, Should be in the HRZ or Kalubik today. Logging Engineer: Mark Lindloff/Robert Haveriteld 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 41 t"t"t~ '1 Well: . . NS33 . Date: 3/25/2007 Sperry Grilling ser..ices Area: Beaufort Sea Depth 22358 Lease: North Star Is. Footage Last 24 hrs: 854 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: J Rall/ R. Watkins Mudlogger's Morning Report J. LeBlanc u..~: ~ r,. -~ Current Avg 24 hr Max Pump and Flow Data Flow rate 806 gpm R.O.P. 57 ft/hr 77 ft/hr ( 186 ft/hr @ 22175 ) Pumps 236 spm 3.5 gps Gas' 84 units 144 unit: ( 330 units @ 21886 ) Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Sample Quality ~X Good ~ Fair ~ Poor ~ Horrible Pump Pres 3798 psi 5.5x12 in. Mud Wt In 10.30 ppg Visc 85 secs POM 1.7 ml HTHP 3.6 ml Mud Wt at Max Gas 10.3 ppg Mud Wt Out 10.30 ppg PV 23 cP YP 20 Ibs/100ft2 Gels 28 \ 47 \ 55 ES 710.0 Sd Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 20 RPM: 120 Hrs. On Bit: 106.0 Total Revs on Bit: Footage for Bit Run 5632 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Salt: 21.77 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 32000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft fh~r•w.. _: ,:;tR ~-~,-_~w,<m-~~a.. ~.ww~+~>:w•,u., Pr:t.. .,, Y;,. .:.<,t. .. .::, ,. ,.,,aw,b..w~ _.. Current Lithology: % Shale 70 %Siltstone 20 % Tuff 10 Connection Gas and Mud Cut 21699 ft 170 units 10.2 ppg ft units ppg ft units ppg 21790 ft 250 units 10.2 ppg ft units ppg ft units ppg 21887 ft 330 units 10.2 ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg Depth to Gas in units Max Background GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot _ to _ to _ to to to ~~ hr Recap Drillin ahead, HRZ came in 137 ft TVD earlier than ro nosed. Wei hted mud s stem up to 10.2 p Added steellube and torque has dropped to steady 30-32 kft/Ibs. Abundant pieces of tuff in samples. Drilling is good. Metal from Ditch Magnets: 5.2 OZ., Total 34.6 oz HRZ: 21610' MD, 8623' TVD, Kalubik 21777 MD, 8680' TVD Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air ~. Mud Wt In 10.20 ppg Visc 85 secs POM 2.3 ml HTHP 3.3 ml Mud Wt at Max Gas 10.2 ppg Mud Wt Out 10.20 ppg PV 28 cP YP 19 Ibs/100ft2 Gels 27 \ 30 \ 38 ES 629.0 Sd Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 20 RPM: 120 Hrs. On Bit: 121.0 Total Revs on Bit: Footage for Bit Run 6513 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Salt: 22.34 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 34000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft Current Lithology: % Shale 50 %siltstone 30 '/o SST 20 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 23010 to 23026 329 130 35326 941 218 52 to to to to to 24 hr Recap Drilled ahead. Looking at the gamma Kuparuk "C" looked ood but there was no show as, Samples were mostly shale and siltstone, Observed hi her amonts than normal of tuffacious material and glaucanite . Sandstone that was there was very fine grading to siltstone, very argillaceous and unconsolidated, No Shows were observed. No connection gas was seen. Currently POOH to test BOPs HRZ: 21610' MD, 8623' TVD, Kalubik 21777' MD, 8680' TVD, Kuparuk 22420' MD, 8905' TVD, Kuparuk "C" 23003' MD, 9115' TVD Metal from Ditch Magnets: 2.8 OZ., Total 37.4 oz "' Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 42 II--II.~.~~~~: t~~ Well: . . NS33 . Date: 3/26/2007 Sperry Drilling Services Area: Beaufort Sea Depth 23237 Lease: North Star Is. Footage Last 24 hrs: 881 Rig: Nabors 33E Rig Activity: Circ Job No.: AK-AM-4888594 Report For: J Rall/ R. Watkins Mudlogger's Morning Report J. LeBlanc ~,. ~, ,, ~.~.. .. n Current Avg 24 hr Max Pump and Flow Data Flow rate 806 gpm R.O.P. 0 ft/hr 72 ft/hr ( 260 ft/hr @ 23017 ) Pumps 236 spm 3.5 gps Gas* 0 units 121 unit: ( 329 units @ 22947 ) Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Sample Quality QX Good ~ Fair ~ Poor ~ Horrible Pump Pres 3798 psi 5.5x12 in. Sperry Grilling Services J Mudlogger's Morning Report Customer: B.P. Exploration Well: NS33 Area: Beaufort Sea Lease: North Star Is. Rig: Nabors 33E Job No.: AK-AM-4888594 Report No.: 43 Date: 3/27/2007 Depth 23237 Footage Last 24 hrs: 0 Rig Activity: POH/Circ Report For: J Rall/ R. Watkins J. LeBlanc Current Avg 24 hr Max Pump and Flow Data Flow rate 794 gpm R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 236 spm 3.5 gps Gas'" 45 units 28 unit: ( 117 units @ 16790 ) Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. ' Sample Quality ~X Good ~ Fair ~ Poor ~ Horrible Pump Pres 3798 psi 5.5x12 in. Mud Wt In 10.40 ppg Visc 84 secs POM 1.9 ml HTHP 3.7 ml Mud Wt at Max Gas 10.2 ppg Mud Wt Out 10.40 ppg PV 29 cP YP 21 Ibs/100ft2 Gels 23 \ 30 \ 34 ES 540.0 LG 8.2 Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: RPM: Hrs. On Bit: 121.0 Total Revs on Bit: Footage for Bit Run 6513 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Salt: 23.34 ppm Short Trip Depth 16809 ft Short Trip Gas: 117 Mud Cut: _ppg CI: 36000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft Current Lithology: % Shale 50 %Siltstone 30 '/o SST 20 i Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot _ to _ to _ to _ to _ to to 24 hr Recap Continue Circulatin ,started POH for BOP test. Ti ht spot at 19936, Pulled up to 'ust below the shoe, circulated to clean the casin and lower up drag. Metal from Ditch Magnets: 4.3 OZ., Total 41.7 oz HRZ: 21610' MD, 8623' TVD, Kalubik 21777' MD, 8680' TVD, Kuparuk 22420' MD, 8905' TVD, Kuparuk "C" 23003' MD, 9115' TVD Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air n t Il 0 - _ ; . Customer: B P Ex loration Re ort No : 44 p p ~, ~ tr.~ ~ ~. _ `"~ ~~" ` ~ "~ ~" ~~ '~ . . . Well: NS33 Date: 3/ 28/2007 Sperry Grilling sar..ioes Area: Beaufort Sea Depth 23237 udlogger's Morning Report ..., Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: Slipping & Cutting Job No.: AK-AM-4888594 Report For: M. Dinger/ R. Watkins J. LeBlanc Current Avg 24 hr Max R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas* 0 units 0 unit: ( 0 units @ 0 ) Sample Quality QX Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate 0 gpm Pumps 0 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres 0 psi 5.5x12 in. Mud Wt In 10.30 ppg Visc 92 secs POM 2.3 ml HTHP 3.7 ml Mud Wt at Max Gas 10.3 ppg Mud Wt Out 10.30 ppg PV 36 cP YP 18 Ibs/100ft2 Gels 19 \ 35 \ 41 ES 856.0 LG 6.5 Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: RPM: Hrs. On Bit: 121.0 Total Revs on Bit: Footage for Bit Run 6513 Trip Depth: ft Trip Gas: 0 Mud Cut: ppg Salt: 27.21 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 43000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft µ:~h~' Current Lithology: % Shale 50 %Siltstone 30 '/° SST 20 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to _ ... 24 hr Recap Continue to circulate below the shoe, till cuttings reduced over shakers, Pulled up into the casin Tested BOP's, Currently Slipping and Cutting Drill Line and servicing top drive. Metal from Ditch Magnets: 4.3 OZ., Totat 41.7 oz HRZ: 21610' MD, 8623' TVD, Kalubik 21777' MD, 8680' TVD, Kuparuk 22420' MD, 8905' TVD, Kuparuk "C" 23003' MD, 9115' TVD Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air 0 r i Mud Wt In 10.30 ppg Visc 113 secs POM 1.2 ml HTHP 3.1 ml Mud Wt at Max Gas 10.3 ppg Mud Wt Out 10.30 ppg PV 38 cP YP 17 Ibs/100ft2 Gels 16 \ 30 \ 35 ES 801.0 LG 6.8 Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: RPM: Hrs. On Bit: 121.0 Total Revs on Bit: Footage for Bit Run 6513 Trip Depth: 21700 ft Trip Gas: 485 Mud Cut: ppg Salt: 23.36 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 37000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft Current Lithology: % Shale 50 %Siltstone 30 % SST 20 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg. GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Finish Cuttin & Slippin ,RIH, Worked through Tight Spot at 16920' MD, Reamed and~circulated to clean the hole further, 1700 hrs, Start RIH to 21,700, Currently circulatin at that de th. 03/30/2007 at 2:38 AM Trip Gas peaked at 485 Units. Metal from Ditch Magnets: 8.1 OZ., Total 49.8 oz HRZ: 21610' MD, 8623' TVD, Kalubik 21777' MD, 8680' TVD, Kuparuk 22420' MD, 8905' TVD, Kuparuk "C" 23003' MD, 9115' TVD Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 45 °' ° ~"'' `~ ` ~ ~~'°y°'' ~~~~ ~~ Well: . . NS33 . Date: 3/29/2007 Sperry drilling ser..ices Area: Beaufort Sea Depth 23237 Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: Circulating Job No.: AK-AM-4888594 Report For: M. Dinger/ R. Watkins Mudlogger's Morning Report J. LeBlanc Current Avg 24 hr Max Pump and Flow Data Flow rate 450 gpm R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 125 spm 3.5 gps Gas" 144 units 87 unit: ( 480 units @ 21700 ) Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Sample Quality ~X Good ~ Fair ~ Poor ~ Horrible Pump Pres 4175 psi 5.5x12 in. Sperry drilling Services Mudlogger's Morning Report _, Customer: B.P. Exploration Report No.: 46 Well: NS33 Date: 3/30/2007 Area: Beaufort Sea Depth 23237 Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: Circulating Job No.: AK-AM-4888594 Report For: M. Dinger/ R. Watkins J. LeBlanc Current Avg 24 hr Max Pump and Flow Data Flow rate 763 gpm R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 220 spm 3.5 gps Gas* 26 units 70 unit: ( 686 units @ 21513 ) Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Sample Quality QX Good ~ Fair ~ Poor ~ Horrible Pump Pres 3614 psi 5.5x12 in. Mud Wt In 10.50 ppg Visc 117 secs POM 2.3 ml HTHP 3.3 ml Mud Wt at Max Gas 10.5 ppg Mud Wt Out 10.50 ppg PV 39 cP YP 17 Ibs/100ft2 Gels 27 \ 53 \ 61 ES 800.0 LG 10.4 Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: RPM: Hrs. On Bit: 121.0 Total Revs on Bit: Footage for Bit Run 6513 Trip Depth: ft Trip Gas: Mud Cut: ppg Salt: 25.36 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 38000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft I Current Lithology: % Shale 50 %Siltstone 30 '/° SST 20 i Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Circulating to clean hole. Samples from circulation show no apparent slou hin ,just cuttin s. Predominant) Shale and siltstone. Metal from Ditch Magnets: 1.6 OZ., Total 51.4 oz HRZ: 21610' MD, 8623' TVD, Kalubik 21777' MD, 8680' TVD, Kuparuk 22420' MD, 8905' TVD, Kuparuk "C" 23003' MD, 9115' TVD Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air PB-2 Customer: B : 47 P Exploration Report No . . . Well: NS33 PB2 Date: 3/31 /2007 Sperry drilling services Area: Beaufort Sea Depth 22755 ... < .~»-- Mudlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 1060 Rig: Nabors 33E Rig Activity: Circulating Job No.: AK-AM-4888594 Report For: M. Dinger/ R. Watkins J. LeBlanc : Current Avg 24 hr Max R.O.P. 90 ft/hr 118 ft/hr ( 186 ft/hr @ 21911 ) Gas" 88 units 96 unit: ( 181 units @ 21696 ) Sample Quality QX Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate 780 gpm Pumps 223 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres 4218 psi 5.5x12 in. Mud Wt In 10.80 ppg Visc 122 secs POM 1.3 ml HTHP 3.4 ml Mud Wt at Max Gas 10.8 ppg Mud Wt Out 10.80 ppg PV 45 cP YP 23 Ibs/100ft2 Gels 28 \ 65 \ 74 ES 751.0 LG 12.3 Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 22 RPM: 120 Hrs. On Bit: 130.3 Total Revs on Bit: Footage for Bit Run 7273 Trip Depth: ft Trip Gas: Mud Cut: ppg Salt: 24.38 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 34000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft Current Lithology: % Shale 65 %Siltstone 25 % Tuff 10 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Re-Enter Side track at 21,828' .Wash to to bottom at 21979. Drillin ahead. Lith is followin prett close to NS33 ; Metal from Ditch Magnets: 2.1 OZ., Total 53.5 oz HRZ: 21610' MD, 8623' TVD, Kalubik 21777' MD, 8680' TVD ' Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B Exploration Report No : 48 P ~~~ ~ g~--~3 - . . . Well: NS33 PB2 Date: 4/1/2007 Sperry drilling ser..ices Area: Beaufort Sea Depth 22755 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 1060 Rig: Nabors 33E Rig Activity:- Drilling Job No.: AK-AM-4888594 Report For: M. Dinger/ R. Watkins J. LeBlanc Current Avg 24 hr Max R.O.P. 0 ft/hr 54 ft/hr ( 108 ft/hr @ 22480 ) Gas'" 85 units 78 unit: ( 106 units @ 22499 ) Sample Quality QX Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate 780 gpm Pumps 223 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres 4218 psi 5.5x12 in. Mud Wt In 10.80 ppg Visc 132 secs POM 3.1 ml HTHP 3.2 ml Mud Wt at Max Gas 10.8 ppg Mud Wt Out 10.80 ppg PV 37 cP YP 23 Ibs/100ft2 Gels 25 \ 69 \ 75 ES 744.0 LG 14.3 "; Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 0 RPM: 150 Hrs. On Bit: 144.5 Total Revs on Bit: Footage for Bit Run 7273 Trip Depth: ft Trip Gas: Mud Cut: ppg Salt: 27.50 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 40000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft Current Lithology: % Shale 90 %Siltstone 10 % Tuff 0 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Drillin ahead, to ~ust the to of Kuparuk "C", Circulatin to clean the hole. RPM's are up to 150, TRQ 30 kft/Ib. Samples are lookin reat and hole is cleaning well. Cuttin s are lar er and a si nificant increase is observed coming across the shakers. Kuparuk came in 18 ft higher NS33. Metal from Ditch Magnets: 4.0 OZ., Total 57.5 oz HRZ: 21610' MD, 8623' TVD, Kalubik 21777' MD, 8680' TVD, Kuparuk 22340' MD, 8887' TVD Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air '' : 49 Customer: B P Exploration Report No }~_ ~ ~ - ` ' '' . . . Well: NS33 PB2 Date: 4/2/2007 Sperry Drilling ser..ices Area: Beaufort Sea Depth 23230 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 475 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: M. Dinger/ R. Watkins J. LeBlanc ' Current Avg 24 hr Max R.O.P. 28 ft/hr 47 ft/hr ( 115 ft/hr @ 23090 ) Gas" 180 units 164 unit: ( 367 units @ 22889 ) Sample Quality ~X Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate 770 gpm Pumps 218 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres 4303 psi 5.5x12 in. Mud Wt In 10.90 ppg Visc 122 secs POM 1.3 ml HTHP 3.6 ml Mud Wt at Max Gas 10.9 ppg Mud Wt Out 10.90 ppg PV 36 cP YP 25 Ibs/100ft2 Gels 23 \ 65 \ 81 ES 701.0 LG 14.7 Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 17 RPM: 150 Hrs. On Bit: 155.0 Total Revs on Bit: Footage for Bit Run 7748 Trip Depth: ft Trip Gas: Mud Cut: ppg Salt: 24.92 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 35000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft ,. ,m.. - ., . ,~, .. . ,,, . .. _ , s Current Lithology: % Shale 40 %Siltstone 40 SST 20 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 22825 to 22856 363 123 6740 330 81 25 0 to to to to to 24 hr Recap Finished Circulatin 3 B/U, Hole looked like it cleaned real ood.Went back to drillin . Top Drive went down for an hour, Drilling ahead at report time. Cuttin s still looking good, No shows in the Kuparuk "C" or "A". Sands were very glauconasious in the "C" ,and silty in the "A" with no visable porosity. Metal from Ditch Magnets: 4.0 OZ., Total 61.5 oz Kuparuk 22340' MD, 8887' TVD Kuparuk "C" 22820' MD, 9115' TVD, Kuparuk "A" 23078' MD, 9240' TVD Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B Exploration Report No : 50 P . . . Well: NS33 PB2 Date: 4/3/2007 Sperry ~ril(ing Ser..ioes Area: Beaufort Sea Depth 23460 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 230 Rig: Nabors 33E Rig Activity: Drilling Job No.: AK-AM-4888594 Report For: M. Dinger/ X. Chacin J. Rocket ' Current Avg 24 hr Max R.O.P. 0 ft/hr 48 ft/hr ( 93 ft/hr @ 23380 ) Gas* 30 units 200 unit: ( 298 units @ 23376 ) Sample Quality QX Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate 758 gpm Pumps 215 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres 4303 psi 5.5x12 in. Mud Wt In 10.80 ppg Visc 122 secs POM 2.0 ml HTHP 3.3 ml Mud Wt at Max Gas 10.9 ppg Mud Wt Out 10.80 ppg PV 40 cP YP 29 Ibs/100ft2 Gels 17 \ 57 \ 65 ES 600.0 LG 13.1 Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 _x TFA: 0.7780 Wt On Bit: 0 RPM: 150 Hrs. On Bit: 160.0 Total Revs on Bit: Footage for Bit Run 7978 Trip Depth: ft Trip Gas: Mud Cut: ppg Salt: 27.61 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 39000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft Current Lithology: % Shale 40 %Siltstone 50 SST 10 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Continued Drillin ,stopped to repair Stand Pi e, Finished drillin 2 intermediate section, Circulated 6 x BU Montorin cuttin s comin back on the shakers. Second wave came throu h between the third and fouth BU. Cuttings continued to diminish the 4th BU, down to 25%. By the end of circulation gas was down to 30 units. After midnight Started to POOH. Metal from Ditch Magnets: 1.1 OZ., Total 62.6 oz Kuparuk 22340' MD, 8887' TVD, Kuparuk "C" 22820' MD, 9115' TVD, Kuparuk "A" 23078' MD, 9240' TVD ` Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 51 ~~°" ~ . . . Well: NS33 P62 Date: 4/4/2007 Sperry drilling ser..ioes Area: Beaufort Sea Depth 23460 udlogger's Morning Report Lease: North Star !s. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: POOH/Cir Job No.: AK-AM-4888594 Report For: M. Dinger/ X. Chacin J. Rocket Current Avg 24 hr Max R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas* 23 units 13 unit; ( 156 units @ 17721 ) Sample Quality ~X Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate 771 gpm Pumps 220 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres 4303 psi 5.5x12 in. ' Mud Wt In 10.80 ppg Visc 125 secs POM 1.0 ml HTHP 3.4 ml Mud Wt at Max Gas 10.9 ppg Mud Wt Out 10.80 ppg PV 42 cP YP 24 Ibs/100ft2 Gels 15 \ 76 \ 91 ES 691.0 LG 11 Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 0 RPM: 150 Hrs. On Bit: 160.0 Total Revs on Bit: Footage for Bit Run 7978 Trip Depth: ft Trip Gas: Mud Cut: ppg Salt: 27.10 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 38000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft ~ . ~ .- ~ ~,_ -,.. A~ -,.:... r ~~ Current Lithology: % Shale 40 %Siltstone 50 SST 10 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Continue to POOH, Pullin ti ht around 18390', RIH and circulated 'ob out, Ve little cuttin s comin across the shakers, Back reamed 5 stds then CBU, current) workin through ti ht s of at 17600' and Metal from Ditch Magnets: 1.6 OZ., Total 64.2 oz Kuparuk 22340' MD, 8887' TVD, Kuparuk "C" 22820' MD, 9115' TVD, Kuparuk "A" 23078' MD, 9240' TVD Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 52 - ~: ^~ ~ ~ . . . Well: NS33 PB2 Date: 4/5/2007 Sperry Oriiling Services Area: Beaufort Sea Depth 23460 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: POOH/Cir Job No.: AK-AM-4888594 Report For: M. Dinger/ X. Chacin J. Rocket Current Avg 24 hr Max R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas" 8 units 23 unit: ( 356 units @ 18411 ) Sample Quality ^X Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate 554 gpm Pumps 157 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres 4303 psi 5.5x12 in. '` Mud Wt In 10.80 ppg Visc 114 secs POM 1.8 ml HTHP 3.4 ml Mud Wt at Max Gas 10.8 ppg Mud Wt Out 10.80 ppg PV 34 cP YP 29 Ibs/100ft2 Gels 17 \ 53 \ 62 ES 803.0 LG 8 Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 0 RPM: 145 Hrs. On Bit: 160.0 Total Revs on Bit: Footage for Bit Run 7978 ` Trip Depth: ft Trip Gas: Mud Cut: ppg Salt: 13.36 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 33000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft Current Lithology: % Shale 40 %Siltstone 50 SST 10 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Continue POOH and circulatin . Monitorin cuttin sever half hour. Cuttin shave diminished to around 10% and are very, very finel ground. Metal from Ditch Magnets:.8 OZ., Total 65 oz ,, Kuparuk 22340' MD, 8887 TVD, Kuparuk "C" 22820' MD, 9115' TVD, Kuparuk "A" 23078' MD, 9240' TVD Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 53 ~~ . . . Well: NS33 PB2 Date: 4/6/2007 Sperry Drilling ser..~ces Area: Beaufort Sea Depth 23460 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: POOH/Cir Job No.: AK-AM-4888594 Report For: M. Dinger/ X. Chacin J. Rocket _ Current Avg 24 hr Max R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas* 8 units 17 unit: ( 63 units @ 17177 ) Sample Quality ~X Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate gpm Pumps 0 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres psi 5.5x12 in. Mud Wt In 10.80 ppg Visc 140 secs POM 2.1 ml HTHP 2.4 ml Mud Wt at Max Gas 10.8 ppg Mud Wt Out 10.80 ppg PV 33 cP YP 28 Ibs/100ft2 Gels 26 \ 61 \ 72 ES 736.0 LG 13.1 Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 0 RPM: Hrs. On Bit: 160.0 Total Revs on Bit: Footage for Bit Run 7978 Trip Depth: ft Trip Gas: Mud Cut: ppg Salt: 27.20 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 37000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft Current Lithology: % Shale 40 %Siltstone 50 SST 10 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap Back reamed from 18500' back to 17160', started to packoff, lost some mud to formation when packed off. Continue to back ream at reduced pump rate to prevent openin reamer. Replace swivel packing. Virtually no cuttings coming acrossed the shakers. Metal from Ditch Magnets: 0 OZ., Total 65 oz Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air ~i~~ ~~' ~ Sperry drilling Services Mudlogger's Morning Report Customer: B.P. Exploration Well: NS33 PB2 Area: Beaufort Sea Lease: North Star Is. Rig: Nabors 33E Job No.: AK-AM-4888594 Report No.: 54 ` Date: 4/7/2007 Depth 23460 Footage Last 24 hrs: 0 Rig Activity: POOH/Cir Report For: M. Dinger/ X. Chacin J. Rocket m~ Current Avg 24 hr Max Pump and Flow Data Flow rate 471 gpm R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 134 spm 3.5 gps Gas" 8 units 11 unit: ( 277 units @ 17177 ) Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Sample Quality ~X Good ~ Fair ~ Poor ~ Horrible Pump Pres 1812 psi 5.5x12 in. Mud Wt In 10.80 ppg Visc 148 secs POM 2.7 ml HTHP 2.4 ml Mud Wt at Max Gas 10.8 ppg Mud Wt Out 10.80 ppg PV 34 cP YP 25 Ibs/100ft2 Gels 21 \ 67 \ 77 ES 691.0 LG 10.1 Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 0 RPM: Hrs. On Bit: 160.0 Total Revs on Bit: Footage for Bit Run 7978 Trip Depth: ft Trip Gas: Mud Cut: ppg Salt: 27.92 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 35000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft ' I Current Lithology: % Shale 40 %Siltstone 50 SST 10 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg Depth to _ to _ to _ to to to GAS PEAKS Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 24 hr Recap Backream to shoe, Pull reamer into shoe, ulfed ti ht, RIH one stand. Circulatin B/U All da samples have been astey, At on 04/08/07 01:30 AM increase was observed comin across the shakers. Cuttings were soft, grey silty clay, fine-very fine cuttings, sub rounded to well rounded. Metal from Ditch Magnets: 0 OZ., Total 65 oz Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 55 '~ ~ ~~ . . . Well: NS33 Date: 4/8/2007 Sperry Drilling ser..~ces Area: Beaufort Sea Depth 23460 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: POOH/Cir Job No.: AK-AM-4888594 Report For: M. Dinger/ X. Chacin J. Rocket Current Avg 24 hr Max R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gasp' 0 units 0 unit: ( 0 units @ 0 ) Sample Quality ~X Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate 0 gpm Pumps 0 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres 0 psi 5.5x12 in. Mud Wt In 10.80 ppg Visc 153 secs POM 1.7 ml HTHP 2.6 ml Mud Wt at Max Gas 10.8 ppg Mud Wt Out 10.80 ppg PV 35 cP YP 26 Ibs/100ft2 Gels 23 \ 66 \ 89 ES 897.0 LG 15.1 Bit No.: 8 Type: Hycalog/PDC Bit Size: 10 5/8 Jets: 6 x 13 0 x 0 x TFA: 0.7780 Wt On Bit: 0 RPM: Hrs. On Bit: 160.0 Total Revs on Bit: Footage for Bit Run 7978 Trip Depth: ft Trip Gas: Mud Cut: ppg Salt: 28.54 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 37000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft Current Lithology: % Shale 40 %Siltstone 50 SST 10 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to . ` 24 hr Recap Circulated casin clean 2xbu at 16690' at 750 pm. Pull to 15934, CBU at 800 GPM Untill dra was acceptable. Got fair amount of cuttin s back at first B/U, Start pulling out of the hole, currently layin down 5" drillpipe. Metal from Ditch Magnets: 0 OZ., Total 65 oz Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 56 '° t->'~. ~ '" ' . . . Well: NS33 PB2 Date: 4/9/2007 Sperry Grilling ser..~ces Area: Beaufort Sea Depth 23460 udlogger's Morning Report Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: RIH Job No.: AK-AM-4888594 Report For: M. Dinger/ X. Chacin J. Rocket Current Avg 24 hr Max R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas" 0 units 0 unit; ( 0 units @ 0 ) Sample Quality ~X Good ~ Fair ~ Poor ~ Horrible Pump and Flow Data Flow rate 0 gpm Pumps 0 spm 3.5 gps Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Pump Pres 0 psi 5.5x12 in. ' Mud Wt In 10.80 _ppg Visc 175 secs POM 2.4 ml HTHP 2.8 ml Mud Wt at Max Gas 10.8 ppg Mud Wt Out 10.80 ppg PV 31 cP YP 23 Ibs/100ft2 Gels 16 \ 71 \ 89 ES 950.0 LG 8.5 Bit No.: 9 Type: Hughes GT-C1 Bit Size: 10 5/8 Jets: 3 x 24 0 x 0 x TFA: 1.3250 Wt On Bit: 0 RPM: Hrs. On Bit: 0.0 Total Revs on Bit: Footage for Bit Run 0 Trip Depth: ft Trip Gas: Mud Cut: ppg Salt: 30.90 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 40000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft Current Lithology: % Shale 40 %Siltstone 50 %SST 10 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units .ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap:Continue to POOH, Lay Down BHA#9, Pick up BHA # 10, RIH for clean out run Metal from Ditch Magnets: 0 OZ., Total 65 oz Logging Engineer: Mark Lindloff/Fred Robles 10000 units = 100% Gas In Air _~t Sperry Drilling Services Mudlogger's Morning Report Customer: B.P. Exploration Report No.: 57 Well: NS33 PB2 Date: 4/10/2007 Area: Beaufort Sea Depth 23460 Lease: North Star Is. Footage Last 24 hrs: 0 Rig: Nabors 33E Rig Activity: BOP Test Job No.: AK-AM-4888594 Report For: M. Dinger/ X. Chacin J. Rocket ..e : _. _ .. ~ . Current Avg 24 hr Max Pump and Flow Data Flow rate 0 gpm R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 0 spm 3.5 gps Gas` 0 units 0 unit; ( 0 units @ 0 ) Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Sample Quality QX Good ~ Fair ~ Poor ~ Horrible Pump Pres 0 psi 5.5x12 in. Mud Wt In 10.80 ppg Visc 161 secs POM 2.4 ml HTHP 2.1 ml Mud Wt at Max Gas 10.8 ppg Mud Wt Out 10.80 ppg PV 31 cP YP 27 Ibs/100ft2 Gels 25 \ 71 \ 88 ES 761.0 LG 11.2 Bit No.: 9 Type: Hughes GT-C1 Bit Size: 10 5/8 Jets: 3 x 24 0 x 0 x TFA: 1.3250 Wt On Bit: 0 RPM: Hrs. On Bit: 160.0 Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: Mud Cut: ppg Salt: 29.08 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 38000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft Current Lithology: % Shale 40 %Siltstone 50 %SST 10 Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg Depth _ to _ to _ to _ to _ to to Gas in units Max Background GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot 24 hr Recap:RlH, Currently testing BOPs Metal from Ditch Ma nets: 0 OZ., Total 65 oz Logging Engineer: Mark Lindloff/Robert Haverfield 10000 units = 100% Gas In Air Customer: B P Exploration Report No : 58 „~ ~ ~ ~ Well: . . NS33 PB2 . Date: 4/11/2007 Sperry drilling ser..ices Area: Beaufort Sea Depth 23460 udlogger's Morning Report Lease: Rig: Job No.: North Star Is. Nabors 33E AK-AM-4888594 Footage Last 24 hrs: Rig Activity: Report For: 0 Washing to Bottom J. Rall/ X. Chacin J. Rocket Current Avg 24 hr Max Pump and Flow Data Flow rate 640 gpm R.O.P. 0 ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 182 spm 3.5 gps Gas" 10 units 0 unit: ( 0 units @ 0 ) Pump Capacity 5.5x12 in. Pump Liner & Strk 5.5x12 in. Sample Quality QX Good ~ Fair ~ Poor ~ Horrible Pump Pres 0 psi 5.5x12 in. Mud Wt In 10.80 ppg Visc 123 secs POM 2.6 ml HTHP 2.4 ml Mud Wt at Max Gas 10.8 ppg Mud Wt Out 10.80 ppg PV 26 cP YP 27 Ibs/100ft2 Gels 17 \ 62 \ 75 ES 769.0 LG 10.1 Bit No.: 9 Type: Hughes GT-C1 Bit Size: 10 5/8 Jets: 3 x 24 0 x 0 x TFA: 1.3250 Wt On Bit: 0 RPM: _ 130 Hrs. On Bit: 0.0 Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: Mud Cut: ppg Salt: 24.92 ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg CI: 35000 ppm Tight Spots: to to to Feet of Fill on Bottom: 0 ft ";;~ Current Lithology: % Shale 40 %Siltstone 50 %SST 10 i Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to to 24 hr Recap:Finish testing BOP's, circulate and wash to shoe, CBU until casing was cleaned, tripped in hole to 16735, started taking weight, POOH to shoe and wash to bottom without rotating Metal from Ditch Magnets: 0 OZ., Total 65 oz Logging Engineer: Mark Lindloff/Fred Robles 10000 units = 100% Gas In Air ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ HALLI BU RTON WELL NAME: BP Exploration NS33 PB2 LOCATION: North Star Island OPERATOR: British Petroleum AREA: Beaufort Sea ~,T..y CONTRACTOR: Nabors 33 E STATE: Alaska I~.i!-'' Sperry Drilling Services BHA # Bit # Bit Type Bit Size Depth IN Depth OUT Footage Bit Hours TFA AVG ROP WOB RPM PUMP Press PUMP GPM Bit Grade Remarks 2 & 3 2 Hughes MXCI 16.00 200 4487 4287 27.40 1.031 156.5 3z 23 1758 656 1-1-WT-A-E-I-NO-TD 4 3 Smith Hole Opener 21.00 200 4487 4287 6.20 1.325 0.0 27 0 0 600 3 4 Hycalog RSX716M-C1 12.25 4487 12178 7691 70.20 1.003 109.6 to 143 1897 957 2-3-CT-A-X-2-NO-DTF Run with 14.75" ghost reamer. Failed on 02/19/2007 0700 hr. 4 5 Hycalog RSX716M-C1 12.25 12178 16449 4271 50.41 1.003 84.7 z3 124 2276 927 1-0-CT-C-X-1*N-BSF Run with 14.75" ghost reamer. POOH do to washout. Crack in NM Drill collar 5 6 Hycalog RSX716M-C1 12.25 16449 16508 59 0.50 1.003 117.1 12 140 2220 1000 1-0-CT-C-X-NO-BSF Run with 14.75" ghost reamer. 14 314" TD Section 6 7 Hycalog RSX616M-A5 10.63 16508 16730 222 4.60 0.778 48.3 20 812 O-0-NO-A-X-I-NO-TO Run with 12.25" Rhino Reamer, POOH Excessive torque 7 8 Hycalog RSX616M-A5 10.63 16730 23460 6730 160.00 0.778 42.1 20 800 Run with 12.25" Rhino Reamer, Sidetracked hole, Rename well NS33 PB2 8 9 Hughes CT-C1 10.63 16508 23460 6952 0.00 Off Island when used 9 10 ritr ~r r~ r~r ~r ~ ~ ~ s~ ~^^~- ~^rr ~ ~ ~ rw tr ~ r ~ HALLIBURTON Casing Record Sperry milling Services Water-based Mud Record Company: BP Exploration Well NS33 Rig Nabors 33E Mud Co MI Area North Star Island Job No: AK-AM-0004888594 Spud Date 1/28/2007 TD Date: 18" 4471 ft MD 10 3/4" 16491' ft MD 7" Csg ft MD Date Depth ft - MD Wt ppg Vis sec PV YP Ib/100 Gels Ib/10oft` Filt m/30m R600/R300 Cake 32nds Solids % Water % Sd % Pm pH MBT Pf/Mf Chlor ppm(k Hard Ca++ Remarks 28-Jan 0 9.00 210 15 70 38/40 NC 100/85 1 0.0 0.05 9.0 0.0 .05/.35 23.0 2080 Washin out conductor 29-Jan 829 9.10 185 12 69 17/21/24 NC 93/81 1 9.5 91 0.00 0.05 9.0 0.0 .05/.35 22.0 2080 Drillin 30-Jan 2503 9.40 180 24 59 28/44/45 15.0 107/83 3 9.5 91 0.00 0.05 8.6 15.0 .05/.30 24.0 2200 Drillin 31-Jan 4200 9.30 173 23 58 27/34/36 9.0 104/81 3 9.5 91 . 0.75 0.05 8.6 15.0 .05/.35 24.0 2160 Drilling 1-Feb 4487 9.30 52 11 28 13/16/18 4.2 50/39 2 6.5 89 0.25 0.06 9.5 12.0 .06/.40 23.0 2350 Drilling 2-Feb 4487 9.10 158 23 58 28/41/49 7.4 104/81 3 10.0 88 0.50 0.05 8.6 16.0 .05/.35 25.0 1840 Reamin 16" hole to 21" 3-Feb 4487 9.20 60 16 34 17/31/37 6.8 66/50 2 10.0 87 0.50 0.05 8.8 16.5 .051.35 25.0 1840 POOH 4-Feb 4487 9.40 178 27 70 35/56/65 7.0 124/97 3 16.0 82 0.50 0.05 8.6 16.5 .05/.35 24.0 1880 Runnin Casin 5-Feb 4487 9.50 202 28 69 38/70/83 7.0 125/97 2 16.0 82 0.50 0.05 8.6 20.0 .05/.35 23.0 1880 Workin Stuck Casin 6-Feb 4487 9.20 65 17 29 16/45/ 7.0 63/46 2 12.0 86 0.00 0.05 8.9 20.0 .05/.35 24.0 1880 TIH Cement stin er 7-Feb 4487 9.20 58 20 29 13/19/25 7.5 69/49 2 12.0 86 0.25 0.00 8.0 17.0 .05/.35 22.0 2000 Cementin 8-Feb 4487 NU BOP / no mud report 9-Feb 4487 9.30 57 20 27 12/19/25 7.5 67/47 1 7.0 91 0.25 0.00 8.0 16.5 .00/.50 22.0 2000 NU BOP /RISER /TEST 10-Feb 4487 9.30 57 20 27 12/19/25 7.5 67/47 1 7.0 91 0.25 0.00 8.0 16.5 .00/.50 22.0 2000 Test BOP / Lo Casin 11-Feb 4487 9.30 57 20 27 12/19/25 7.5 67/47 1 7.0 91 0.25 0.00 8.0 16.5 .00/.50 22.0 2000 Pickin u Drill ipe 12-Feb 4487 8.80 80 12 27 11/15/17 5.0 51/39 1 4.0 93 0.00 0.00 8.5 0.0 .09/1.00 22.0 1760 Test BOP / Lo Casin 13-Feb 4487 8.90 90 12 27 11/15/17 5.0 51/39 1 4.0 93 0.00 0.00 9.1 0.0 .01/1.00 22.0 1760 RIH / Sli and Cut Dill Line 14-Feb 5760 9.30 71 16 28 8/15/19 4.0 60/44 1 7.5 88 0.25 0.00 9.0 10.0 .04/.64 25.0 1320 Drillin 15-Feb 7568 9.30 62 13 26 9/17/21 4.6 52/39 1 6.0 89 0.25 0.80 8.9 12.0 .05/.65 20.0 1400 Drillin 16-Feb 9692 9.40 71 16 32 18/26/29 4.0 54/48 1 8.0 88 1.00 0.10 8.9 14.0 .02/.82 24.0 1720 Drillin 17-Feb 10362 9.40 68 14 33 15/22/25 4.5 61 /47 1 7.0 89 0.50 0.05 8.8 14.0 .01 /.70 22.0 1480 POOH 18-Feb 11662 9.40 68 18 34 17/22/26 4.3 70/52 1 8.0 87 0.25 0.24 8.9 15.0 .01/1.00 25.0 1340 Drillin 19-Feb 12177 9.30 69 14 36 18/25/27 4.0 64/50 1 8.0 88 0.25 0.45 8.8 15.0 .04/.84 24.0 1600 POOH 20-Feb 12177 9.30 65 13 38 12/21 /25 4.5 64/51 1 8.0 87 tr 0.10 9.0 14.0 .01 /.93 25.0 1580 Test BOP 21-Feb 12177 9.30 65 13 36 15/22/24 4.6 62/49 1 7.0 88 tr 0.01 8.0 14.0 .01/.76 25.0 1280 RIH 22-Feb 12350 9.40 64 13 30 10/17/19 4.6 56/43 1 8.0 88 1.00 0.01 8.6 16.0 .01/.43 25.0 1800 Drillin 23-Feb 13984 9.40 65 12 39 14/19/23 4.6 63/51 1 8.0 88 0.25 0.01 8.2 17.0 tr/1.60 24.0 1440 Drillin 24-Feb 16452 9.40 70 12 41 17!22/27 4.1 65/53 1 9.0 86 0.25 0.01 8.4 15.0 0/1.50 21.0 1360 Drillin 25-Feb 16452 9.40 66 13 39 16/22/26 4.2 65/52 1 9.0 86 tr 0.30 8.8 14.0 .08/1.28 22.0 1520 POOH 26-Feb 16452 9.30 62 10 28 12/15/18 4.0 48/38 1 8.0 87 tr 0.20 8.7 13.0 .09/1.40 22.0 1520 POOH 27-Feb 16452 9.30 61 13 34 13/17/22 4.4 60/47 1 8.0 87 tr 0.20 9.1 13.0 .07/1.37 21.0 1480 RIH 28-Feb 16508 9.50 60 12 38 14/18/22 4.6 62/50 1 9.0 86 tr 0.12 8.7 15.0 .02/1.30 22.0 1480 Circulatin 1-Mar 16508 9.40 51 11 33 11/13/17 4.6 55/44 1 9.0 86 tr 0.01 8.4 13.0 tr/1.10 22.0 1580 POOH 2-Mar 16508 9.40 52 12 29 11/15/18 4.5 53/41 1 8.0 85 tr 0.10 8.6 13.0 .01/1.20 22.0 1520 Runnin Casin 11.75" 3-Mar 16508 9.40 52 13 29 11/16/18 4.4 55/42 1 8.0 87 tr 0.10 8.6 13.0 .01/1.00 22.0 1580 Runnin Casin 11.75" 4-Mar 16508 9.50 53 13 28 12/15/17 4.6 54/41 1 8.0 87 tr 0.15 8.6 13.0 .01/1.10 22.0 1580 Cementin 5-Mar 16508 9.50 45 14 22 9/12/15 4.8 50/36 1 8.0 87 tr 0.15 S.5 13.0 .01/1.10 22.0 1580 Bump Plug ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ r HALLIBURTON Sperry Tilling Servit~s Oil-based Mud Record Company: BP Exploration Well NS33 BP1 Rig Nabors 33E Mud Co MI Casing Record Area North Star Island Job No: AK-AM-0004888594 Ili" ft MD Spud Date 1/28/2007 10 3/4" ft MD TD Date: 7" Csg ft MD Date Depth ft - MD Wt ppg Vis sec PV YP Ib/100 Gels Ibnoon` HTHP m/30m RBOOIR300 R200/R100/R6/R Cake 32nds Solids % NAP/ Water Sd % Alk Pom-ml THTS caci2 ppb ES volts ~cs/-,cs Remarks %~voi 6-Mar 16508 9.40 44 14 22 9/12/15 4.8 50/36 1 8.0 87 tr 0.15 8.5 13.0 .01/1.10 22.0 ND BOP's/Cleaning Pits 7-Mar 16508 9.40 43 15 19 9/11/13 4.8 49/34 1 8.0 87 tr 0.15 8.5 13.0 .01/1.10 22.0 Continue to ND 8-Mar 16508 0.00 0 0 0 0 0.0 0 0 0.0 0 0.00 0.00 0.0 0.0 0 0.0 Testing, oil base mud 9-Mar 16508 0.00 0 0 0 0 0.0 0 0 0.0 0 0.00 0.00 0.0 0.0 0 0.0 NU BOP's 10-Mar 16508 0.00 0 0 0 0 0.0 0 0 0.0 0 0.00 0.00 0.0 0.0 0 0.0 11-Mar 16508 9.10 122 23 22 26/32/34 0.0 ,6/,7/24/37/45/66 0 12.0 68/11 0.00 0.0 0.0 842.0 O RIH 12-Mar 16508 9.10 122 23 22 26/32/34 3.6 ,sn7ns/37/as/ss 0 11.0 81/19 0.90 0.0 1.2 835.0 4 Displace to MOBM 13-Mar 16553 9.10 101 22 23 24/33 3.6 15/i6/25/35I45I67 3 9.5 79/21 1.30 0.0 1.7 701.0 7/1.3 work on Pumps 14-Mar 16730 9.20 96 24 21 24/33/34 3.4 16/17/25/36145/69 3 8.3 81/19 2.70 0.0 3.5 881.0 6.5/1.9 RIH 15-Mar 16730 9.20 96 25 21 21/26/27 3.4 ,6n7na/3a/a6n, 3 11.0 80/20 1.80 0.0 2.3 766.0 8.1/1.2 POOH 16-Mar 16703 9.20 98 25 20 19/26/28 3.4 ,6n7/za/3a/asno 3 11.0 80/20 1.80 0.0 2.3 790.0 8.1/1.2 RIH 17-Mar 17394 9.40 96 23 20 29/31/38 3.0 15/,6/25/35/43/66 3 12.0 79/21 1.70 0.0 2.2 1060.0 9.8/1 18-Mar 18122 9.40 81 20 19 29/36/49 2.9 ,5/,6/22/3,/39/59 3 12.0 80/20 1.70 0.0 2.2 971.0 10.1/.7 19-Mar 18825 9.40 83 17 18 28/31/39 2.9 13/,4/20/27/35/52 3 11.5 80/20 2.20 0.0 2.9 1191.0 10.2/1.3 20-Mar 19761 9.40 99 23 19 29/35/50 3.0 14N6/23/32/42/65 3 14.0 81/19 2.70 0.0 3.5 1093.0 11 21-Mar 20579 9.40 106 23 20 35/36/50 3.2 ,6/,7/25/35/43/66 3 13.5 81/19 2.10 0.0 2.7 966.0 9.9/2 22-Mar 20579 9.40 106 23 20 35/36/51 3.2 16117@5/35/43/67 3 13.5 80/20 2.10 0.0 2.7 966.0 9.9/3 23-Mar 21515 9.50 86 22 20 33/35/42 3.4 18/19/27/38/43/63 3 12.0 80/20 1.40 0.0 1.8 730.0 9.7/2.3 24-Mar 22358 10.30 85 23 20 28/47/55 3.6 ,5/,6/24/35/43/66 3 14.5 79/21 1.70 0.0 2.2 710.0 7.8/6.4 25-Mar 23243 10.20 85 28 19 27/30/38 3.3 ,a/,s/2s/3s/a7n5 3 14.0 78/22 2.30 0.0 3.0 629.0 6.5/6.7 26-Mar 23243 10.40 84 29 21 23/30/34 3.7 0 3 0.0 0.00 0.0 0.0 0.0 0 27-Mar 23243 10.40 84 29 21 23/30/34 3.7 ,ansn5/37/5ons 3 16.0 78/22 1.90 0.0 2.5 540.0 8.2/6.4 28-Mar 23243 10.30 92 36 18 19/35/41 3.4 „/,3/251ai154/90 3 15.0 79/21 2.30 0.0 3.0 856.0 6.5/6.8 29-Mar 23243 10.30 113 38 17 16/30/35 3.1 10N2/27/42/55/93 3 15.0 78/22 1.20 0.0 1.6 801.0 6.8/6.7 30-Mar 23243 10.50 117 39 17 27/53/61 3.3 ,3/,4/29/44/56/95 3 17.5 79/21 2.30 0.0 3.0 800.0 10.4/5.6 PB-2 III II. III. ~ ~ r ^^~ III. ~ ~ ~ II. i ~ III. ~ ~ ~ III. HALLIBURTON Sperry milling Services Oil-based Mud Record Company: BP Exploration Well NS33 PB2 Rig Nabors 33E Mud Co MI Casing Record Area North Star Island Job No: AK-AM-0004888594 16" Casing 4471 ft MD Spud Date 1/28/2007 10 3/4" Casing 16491' ft MD TD Date: 05//05/2007 Date Oil Depth ft - MD Wt ppg Vis sec PV YP Ib/100 Gels Ib/100ft` HTHP m/30m R800/R300 R200/R100/R6/R Cake 32nas Solids % NAP/ Water Sd % Alk Pom-ml THTS caci2 ppb ES volts LGSIHGS °/u/vol Remarks 31-Mar 22126 10.80 122 45 23 28/65/74 3.4 15/,6/36/53/68/„ 3 19.5 80/20 1.30 0.0 1.7 751.0 12.3/5.9 DRILLING 1-Apr 22755 10.80 132 37 23 25/69/75 3.2 ,4/,5/3,/47/60/97 3 19.2 79/21 3.10 0.0 4.0 744.0 14.3/4.6 CIRCULATING 2-A r 23252 10.90 122 36 25 23/65/81 3.6 ,sns/3s/as/s,/si 3 19.9 79/31 1.30 0.0 1.7 701.0 14.7/4.9 DRILLING 3-A r 23460 10.80 122 40 29 17/57/65 3.3 ,3/,4/3,/54/69/,0 3 18.7 80/20 2.00 0.0 2.6 600.0 13.1/5.3 TD Section, Cleanin Hole 4-Apr 23460 10.80 125 42 24 15/76/91 3.4 ,3/,4/35/52/66/,0 3 19.0 80/20 1.00 0.0 1.3 691.0 11/6.4 POOH 5-Apr 23460 10.80 114 34 29 17/53/62 2.4 ,onz/32/a~re31s~ 3 17.5 81/19 1.80 0.0 2.3 803.0 8/8.2 Backreamin 6-Apr 23460 10.80 140 33 28 26/61/72 2.4 13/14/32147!59188 3 20.0 81/19 2.10 0.0 2.7 736.0 13.1!5.4 Backreamin 7-Apr 23460 10.80 148 34 25 21/67/77 2.7 ,2/,3/3 314 5 /5 9!93 3 18.5 80/20 2.70 0.0 3.5 691.0 10.1/7 CIRCULATING 8-A r 23460 10.80 153 35 26 23/66/89 2.6 ,2/,3/33/49/6,196 3 21.0 82/18 1.70 0.0 2.2 897.0 15.1/4.4 POOH 9-A r 23460 10.80 175 31 23 16/71/89 2.8 snores/as/sa/a 3 18.0 83/17 2.40 0.0 3.1 950.0 8.5/7.8 RIH 10-A r 23460 10.80 161 31 27 25/71/88 2.1 12/,3/30/45/58/89 3 19.0 82/18 2.40 0.0 3.1 761.0 11.2/6.3 Test BOP's 11-A r 23460 10.80 123 26 27 17/62/75 2.4 „1,2/26/a,/s3n9 3 18.5 80/20 2.60 0.0 3.4 769.0 10.1/7 Washin to bottom 12-A r 23460 Off Island SHOW REPORTS BP EXPLORATION NORTHSTAR BP-1 There were no reportable shows for NS 33 BP-1 1~ ~I~ ~. HALLIBURTON Sperry-Sun Directional Survey Data Measured Depth (feet) Inclination (degrees) Direction (degrees) Vertical Depth (feet) Latitude (feet) Departure (feet) Vertical Section (feet) Dogleg (deg/100ft) 50.00 0.70 18.25 50.00 0.29 N 0.10E 0.10 TIE-IN 100.00 0.62 18.15 100.00 0.84 N 0.28E 0.29 0.16 150.00 0.82 18.87 149.99 1.43 N 0.48E 0.50 0.40 208.00 1.14 324.05 207.98 2.29 N 0.27E 1.19 1.63 304.00 2.81 285.74 303.93 3.70 N 2.55 W 4.29 2.13 401.00 3.96 293.87 400.76 5.70 N 7.91 W 9.74 1.28 497.00 6.90 301.08 496.32 10.02 N 15.88 W 18.70 3.14 601.00 9.54 304.47 599.24 18.13 N 28.34 W 33.51 2.58 697.00 10.57 307.34 693.76 27.97 N 41.90 W 50.26 1.19 792.00 11.04 314.28 787.08 39.61 N 55.34 W 68.01 1.46 889.00 13.58 313.64 881.85 53.95 N 70.23 W 88.56 2.62 984.00 16.40 309.47 973.61 70.18 N 88.66 W 113.06 3.18 1107.67 19.19 310.74 1091.35 94.55 N 117.54 W 150.82 2.28 1200.87 20.23 307.72 1179.09 114.40 N 141.89 W 182.23 1.56 1297.20 17.22 306.36 1270.31 133.05 N 166.56 W 213.14 3.16 1392.14 17.76 308.97 1360.86 150.49 N 189.13 W 241.67 1.00 1489.08 19.49 308.60 1452.72 169.88 N 213.27 W 272.62 1.79 1583.76 22.65 295.86 1541.11 187.70 N 242.04 W 306.29 5.86 1679.62 25.69 300.32 1628.56 206.24 N 276.59 W 344.98 3.70 1775.18 28.20 303.38 1713.74 229.13 N 313.34 W 388.05 3.00 1871.48 29.67 303.16 1798.02 254.68 N 352.29 W 434.50 1.53 1965.18 31.78 303.78 1878.56 281.09 N 392.22 W 482.25 2.28 2063.06 32.73 305.75 1961.34 310.88 N 435.12 W 534.41 1.45 2157.37 34.74 304.82 2039.77 341.13 N 477.87 W 586.74 2.20 2253.42 37.38 304.31 2117.41 373.19 N 524.43 W 643.19 2.77 2347.98 40.28 303.68 2191.06 406.33 N 573.59 W 702.35 3.10 2444.14 43.23 303.68 2262.79 441.84 N 626.87 W 766.23 3.07 2538.11 44.38 303.92 2330.61 478.03 N 680.92 W 831.13 1.24 2634.34 46.29 303.90 2398.25 516.21 N 737.72 W 899.42 1.98 2729.10 49.05 304.09 2462.05 555.37 N 795.79 W 969.33 2.92 2824.67 51.49 304.31 2523.14 596.69 N 856.58 W 1042.69 2.56 2918.45 54.73 304.69 2579.42 639.17 N 918.38 W 1117.57 3.47 3013.08 56.67 305.69 2632.75 684.22 N 982.26 W 1195.67 2.23 3107.78 58.29 307.05 2683.66 731.58 N 1046.55 W 1275.49 2.10 3204.32 60.50 307.14 2732.80 781.69 N 1112.82 W 1358.58 2.29 3299.88 61.24 306.69 2779.32 831.83 N 1179.56 W 1442.04 0.88 3395.36 63.15 307.33 2823.86 882.67 N 1246.99 W 1526.49 2.09 3492.63 65.24 306.99 2866.20 935.56 N 1316.78 W 1614.05 2.17 3588.44 67.89 307.18 2904.30 988.56 N 1386.90 W 1701.95 2.77 3685.50 69.42 307.17 2939.63 1043.19 N 1458.93 W 1792.34 1.58 Job No.: AK-AM-0004721163 Well No.: NS33 PB1 End of Well Report Page 1 HALLIBURTON Sperry-Sun Directional Survey Data Measured Depth (feet) Inclination (degrees) Direction (degrees) Vertical Depth (feet) Latitude (feet) Departure (feet) Vertical Section (feet) Dogleg (deg/100ft) 3780.68 71.96 308.29 2971.10 1098.15 N 1529.96 W 1882.16 2.89 3876.89 72.34 306.40 3000.59 1153.70 N 1602.76 W 1973.73 1.91 3973.27 71.34 305.49 3030.63 1207.46 N 1676.90 W 2065.27 1.37 4069.13 70.63 306.64 3061.86 1260.81 N 1750.16 W 2155.86 1.35 4164.91 69.97 306.70 3094.15 1314.66 N 1822.48 W 2246.02 0.69 4260.68 70.28 305.65 3126.71 1367.82 N 1895.19 W 2336.06 1.08 4357.16 71.46 305.77 3158.33 1421.03 N 1969.20 W 2427.15 1.23 4419.22 71.45 306.12 3178.07 1455.57 N 2016.83 W 2485.97 0.53 4549.84 72.93 304.83 3218.02 1527.73 N 2118.10 W 2610.23 1.47 4644.51 72.51 304.53 3246.14 1579.16 N 2192.44 W 2700.51 0.54 4741.10 71.93 304.18 3275.63 1631.07 N 2268.37 W 2792.33 0.69 4836.57 71.53 303.67 3305.56 1681.67 N 2343.60 W 2882.80 0.66 4932.10 68.50 304.40 3338.21 1731.90 N 2417.99 W 2972.39 3.25 5025.96 67.01 303.55 3373.74 1780.45 N 2490.03 W 3059.08 1.80 5122.44 69.31 304.05 3409.63 1830.27 N 2564.44 W 3148.43 2.43 5216.38 70.66 306.15 3441.79 1881.03 N 2636.64 W 3236.60 2.54 5312.87 70.92 306.71 3473.53 1935.13 N 2709.95 W 3327.70 0.61 5407.43 71.34 307.96 3504.12 1989.40 N 2781.09 W 3417.17 1.33 5503.39 71.91 307.63 3534.37 2045.21 N 2853.06 W 3508.24 0.68 5596.99 72.44 306.94 3563.02 2099.19 N 2923.95 W 3597.34 0.90 5694.64 72.64 307.22 3592.32 2155.35 N 2998.27 W 3690.49 0.34 5789.14 71.29 307.01 3621.58 2209.57 N 3069.92 W 3780.34 1.44 5884.00 70.30 307.40 3652.78 2263.74 N 3141.27 W 3869.92 1.11 5978.34 69.95 308.15 3684.85 2318.08 N 3211.39 W 3958.64 0.83 6074.58 70.12 309.43 3717.71 2374.75 N 3281.90 W 4049.07 1.26 6170.41 70.28 311.10 3750.18 2433.02 N 3350.70 W 4139.14 1.65 6265.74 70.31 310.90 3782.32 2491.90 N 3418.43 W 4228.73 0.20 6360.36 70.61 311.11 3813.97 2550.41 N 3485.72 W 4317.75 0.38 6455.96 70.83 311.59 3845.53 2610.03 N 3553.46 W 4407.80 0.53 6550.05 70.85 311.66 3876.41 2669.07 N 3619.90 W 4496.46 0.07 6645.97 70.89 312.05 3907.85 2729.53 N 3687.40 W 4586.84 0.39 6739.57 70.49 312.16 3938.80 2788.76 N 3752.93 W 4674.90 0.44 6837.35 71.23 312.74 3970.86 2851.11 N 3821.09 W 4766.95 0.94 6932.26 71.74 310.90 4001.00 2911.11 N 3888.16 W 4856.70 1.92 7028.96 72.17 309.22 4030.96 2970.28 N 3958.53 W 4948.56 1.71 7123.95 71.44 307.13 4060.62 3026.06 N 4029.46 W 5038.79 2.23 7219.63 71.07 306.21 4091.37 3080.17 N 4102.13 W 5129.38 0.99 7316.13 70.65 305.64 4123.01 3133.66 N 4175.96 W 5220.51 0.71 7412.82 71.19 306.62 4154.62 3187.54 N 4249.76 W 5311.85 1.11 7509.44 70.64 307.21 4186.21 3242.38 N 4322.76 W 5403.15 0.81 Job No.: AK-AM-0004721163 Well No.: NS33 PB1 End of Well Report Page 2 HALLIBURTON Sperry-Sun Directional Survey Data Measured Depth (feet) Inclination (degrees) Direction (degrees) Vertical Depth (feet) Latitude (feet) Departure (feet) Vertical Section (feet) Dogleg (deg/100ft) 7605.93 71.88 308.73 4217.21 3298.60 N 4394.79 W 5494.52 1.97 7700.90 71.02 308.49 4247.42 3354.78 N 4465.14 W 5584.54 0.94 7797.40 72.19 308.31 4277.87 3411.66 N 4536.91 W 5676.10 1.23 7893.09 72.17 305.76 4307.16 3466.52 N 4609.62 W 5767.19 2.54 7989.93 71.63 304.37 4337.25 3519.40 N 4684.96 W 5859.14 1.47 8085.80 71.31 304.51 4367.72 3570.81 N 4759.92 W 5949.90 0.36 8182.54 70.94 306.30 4399.01 3623.84 N 4834.53 W 6041.36 1.79 8278.96 70.89 307.94 4430.54 3678.83 N 4907.19 W 6132.47 1.61 8375.87 71.04 309.37 4462.15 3736.05 N 4978.72 W 6224.07 1.40 8473.24 71.28 309.82 4493.59 3794.78 N 5049.73 W 6316.17 0.50 8570.30 71.41 309.93 4524.64 3853.74 N 5120.31 W 6408.06 0.17 8666.53 71.41 309.71 4555.31 3912.15 N 5190.36 W 6499.20 0.22 8763.43 71.27 309.92 4586.32 3970.94 N 5260.88 W 6590.94 0.25 8860.74 71.55 310.73 4617.34 4030.62 N 5331.20 W 6683.07 0.84 8957.60 71.95 310.33 4647.67 4090.40 N 5401.11 W 6774.94 0.57 9053.76 72.16 310.11 4677.30 4149.47 N 5470.97 W 6866.33 0.31 9151.80 72.25 309.92 4707.26 4209.49 N 5542.46 W 6959.60 0.21 9245.98 72.09 308.62 4736.10 4266.24 N 5611.87 W 7049.22 1.32 9342.91 71.93 308.46 4766.04. 4323.68 N 5683.98 W 7141.40 0.23 9438.47 72.03 308.19 4795.60 4380.04 N 5755.27 W 7232.27 0.29 9535.10 72.11 307.85 4825.35 4436.66 N 5827.69 W 7324.20 0.34 9631.99 71.35 307.66 4855.72 4493.00 N 5900.44 W 7416.20 0.81 9727.10 71.29 308.51 4886.18 4548.57 N 5971.35 W 7506.30 0.85 9821.98 71.96 308.44 4916.09 4604.59 N 6041.84 W 7596.33 0.71 9917.63 72.20 308.05 4945.52 4660.93 N 6113.32 W 7687.34 0.46 10014.11 72.37 307.39 4974.88 4717.16 N 6186.02 W 7779.24 0.68 10108.88 72.15 305.98 5003.76 4771.08 N 6258.40 W 7869.49 1.44 10205.59 72.00 305.86 5033.52 4825.06 N 6332.92 W 7961.46 0.19 10303.39 71.82 305.75 5063.89 4879.45 N 6408.31 W 8054.38 0.21 10369.58 71.61 305.82 5084.66 4916.20 N 6459.30 W 8117.20 0.33 10466.92 71.25 305.76 5115.66 4970.16 N 6534.15 W 8209.42 0.37 10561.56 70.75 306.78 5146.47 5023.10 N 6606.29 W 8298.88 1.15 10657.88 70.53 307.47 5178.40 5077.95 N 6678.74 W 8389.75 0.71 10753.55 70.95 308.27 5209.96 5133.39 N 6750.04 W .8480.06 0.90 10849.33 71.18 308.83 5241.04 5189.85 N 6820.89 W 8570.65 0.60 10943.42 70.49 309.50 5271.93 5245.98 N 6889.80 W 8659.49 1.00 11039.36 70.97 309.75 5303.59 5303.74 N 6959.55 W 8750.00 0.56 11133.65 71.81 310.13 5333.68 5361.10 N 7028.07 W 8839.29 0.97 11230.99 72.25 309.70 5363.71 5420.52 N 7099.08 W 8931.80 0.62 11324.52 71.95 309.61 5392.46 5477.31 N 7167.61 W 9020.75 0.33 Job No.: AK-AM-0004721163 Well No.: NS33 PB1 End of Well Report Page 3 HALLIBURTON Sperry-Sun Directional Survey Data Measured Depth (feet) Inclination (degrees) Direction (degrees) Vertical Depth (feet) Latitude (feet) Departure (feet) Vertical Section (feet) Dogleg (deg/100ft) 11420.47 71.09 309.96 5422.87 5535.55 N 7237.54 W 9111.69 0.96 11513.95 71.34 309.82 5452.97 5592.30 N 7305.44 W 9200.12 0.30 11610.41 71.74 309.71 5483.51 5650.83 N 7375.77 W 9291.55 0.43 11704.45 71.18 309.07 5513.42 5707.41 N 7444.68 W 9380.67 0.88 11801.85 71.07 308.05 5544.93 5764.86 N 7516.74 W 9472.82 1.00 11896.42 70.67 307.24 5575.92 5819.43 N 7587.49 W 9562.17 0.91 11992.21 70.63 307.10 5607.66 5874.03 N 7659.51 W 9652.54 0.14 12086.53 69.77 307.40 5639.61 5927.75 N 7730.15 W 9741.28 0.96 12173.76 69.48 306.92 5669.98 5977.14 N 7795.31 W 9823.05 0.61 12267.63 71.06 306.77 5701.67 6030.12 N 7866.02 W 9911.40 1.69 12362.38 72.05 307.92 5731.64 6084.65 N 7937.47 W 10001.28 1.55 12457.77 72.08 307.69 5761.02 6140.28 N 8009.18 W 10092.03 0.23 12553.83 72.13 306.81 5790.54 6195.61 N 8081.94 W 10183.44 0.87 12647.84 72.14 305.84 5819.38 6248.61 N 8154.03 W 10272.90 0.98 12743.86 72.71 304.84 5848.37 6301.56 N 8228.70 W 10364.36 1.16 12837.85 72.16 304.78 5876.73 6352.71 N 8302.27 W 10453.86 0.59 12934.40 71.93 304.48 5906.50 6404.91 N 8377.85 W 10545.58 0.38 13028.93 72.49 304.47 5935.38 6455.86 N 8452.05 W 10635.45 0.59 13125.17 71.67 304.58 5964.99 6507.76 N 8527.49 W 10726.88 0.86 13227.59 71.81 305.14 5997.08 6563.35 N 8607.30 W 10824.03 0.54 13318.78 71.64 305.57 6025.68 6613.45 N 8677.92 W 10910.55 0.49 13414.41 71.65 306.02 6055.79 6666.54 N 8751.54 W 11001.27 0.45 13510.61 71.97 307.04 6085.82 6720.94 N 8824.98 W 11092.64 1.06 13609.73 71.61 307.56 6116.80 6778.00 N 8899.88 W 11186.80 0.62 13704.22 71.58 308.55 6146.63 6833.26 N 8970.47 W 11276.45 0.99 13802.00 71.97 308.74 6177.21 6891.26 N 9043.01 W 11369.31 0.44 13897.38 71.73 309.60 6206.93 6948.51 N 9113.28 W 11459.91 0.89 13999.98 71.58 309.86 6239.22 7010.75 N 9188.17 W 11557.23 0.28 14089.86 71.66 308.99 6267.56 7064.92 N 9254.06 W 11642.49 0.92 14186.84 71.48 308.59 6298.22 7122.56 N 9325.77 W 11734.47 0.43 14283.28 71.73 307.75 6328.65 7179.11 N 9397.72 W 11825.98 0.87 14380.03 71.51 307.06 6359.16 7234.89 N 9470.65 W 11917.79 0.71 14475.72 71.78 306.54 6389.29 7289.29 N 9543.37 W 12008.60 0.59 14572.77 71.67 306.00 6419.73 7343.81 N 9617.67 W 12100.73 0.54 14669.46 71.90 304.86 6449.95 7397.05 N 9692.51 W 12192.51 1.14 14766.64 71.94 305.35 6480.11 7450.18 N 9768.08 W .12284.80 0.48 14861.55 71.42 305.95 6509.94 7502.69 N 9841.30 W 12374.84 0.81 14958.70 71.31 306.13 6540.99 7556.85 N 9915.74 W 12466.86 0.21 15055.87 71.30 305.50 6572.13 7610.71 N 9990.37 W 12558.86 0.61 15151.77 71.19 304.89 6602.97 7663.05 N 10064.5EIN 12649.58 0.61 Job No.: AK-AM-0004721763 Well No.: NS33 PB1 End of Well Report Page 4 ~ HALLIBURTON Sperry-Sun Directional Survey Data Measured Depth (feet) Inclination (degrees) Direction (degrees) Vertical Depth (feet) Latitude (feet) Departure (feet) Vertical Section (feet) Dogleg (deg/100ft) 15248.40 71.23 304.48 6634.09 7715.11 N 10139.8CW 12740.94 0.40 15342.88 71.25 302.77 6664.48 7764.65 N 10214.2NV 12830.18 1.71 15439.97 71.50 302.07 6695.49 7813.97 N 10291.9E1N 12921.80 0.73 15535.54 71.71 301.97 6725.64 7862.05 N 10368.8NV 13012.05 0.24 15632.25 71.33 300.97 6756.30 7909.94 N 10447.OEIN 13103.24 1.06 15728.15 71.42 300.96 6786.93 7956.70 N 10525.OCVN 13193.51 0.09 15824.87 71.38 301.51 6817.78 8004.23 N 10603.38VV 13284.60 0.54 15920.76 71.31 301.75 6848.45 8051.88 N 10680.74W 13374.95 0.25 16017.14 71.48 302.46 6879.20 8100.42 N 10758.11W 13465.87 0.72 16113.70 71.21 303.37 6910.09 8150.14 N 10834.91W 13557.05 0.94 16210.44 71.37 304.79 6941.12 8201.48 N 10910.8(,1N 13648.49 1.40 16308.76 71.31 306.79 6972.58 8255.95 N 10986.3E1N 13741.59 1.93 16369.67 71.38 308.10 6992.06 8291.04 N 11032.1 E.MI 13799.30 2.04 16547.61 70.48 309.71 7050.20 8396.65 N 11163.04W 13967.42 0.99 16662.53 70.19 311.00 7088.88 8466.72 N 11245.51W 14075.52 1.09 16758.38 69.77 311.97 7121.69 8526.37 N 11312.97W 14165.37 1.05 16853.22 69.86 313.08 7154.42 8586.54 N 11378.5EW 14254.06 1.10 16950.42 70.04 314.27 7187.74 8649.59 N 11444.6'1N 14344.86 1.16 17046.27 70.37 315.14 7220.20 8713.04 N 11508.71W 14434.36 0.92 17138.02 71.40 315.36 7250.25 8774.60 N 11569.74W 14520.29 1.15 17235.62 71.43 314.48 7281.35 8839.92 N 11635.2yVV 14612.05 0.86 17336.03 71.58 312.62 7313.21 8905.53 N 11704.2E1N 14706.77 1.76 17422.08 71.52 311.71 7340.44 8960.32 N 11764.7E1N 14788.14 1.01 17529.81 71.31 310.67 7374.78 9027.57 N 11841.6C1N 14890.05 0.94 17627.09 71.19 309.80 7406.05 9087.07 N 11911.9TIV 14982.07 0.86 17723.71 70.68 309.31 7437.61 9145.22 N 11982.3~IIV 15073.34 0.71 17819.18 70.19 309.15 7469.58 9202.12 N 12052.01W 15163.26 0.54 17917.63 70.34 308.78 7502.82 9260.39 N 12124.07W 15255.91 0.39 18013.17 70.79 309.00 7534.61 9316.95 N 12194.1 r1N 15345.98 0.52 18107.09 70.74 308.47 7565.55 9372.44 N 12263.3E1N 15434.64 0.54 18204.35 71.31 308.48 7597.18 9429.67 N 12335.37W 15526.61 0.59 18300.55 71.64 308.14 7627.74 9486.21 N 12406.94W 15617.82 0.48 18398.38 72.10 307.72 7658.19 9543.36 N 12480.2EIN 15710.79 0.62 18494.69 72.66 307.78 7687.34 9599.56 N 12552.8NV 15802.58 0.58 18590.89 72.93 307.44 7715.79 9655.64 N 12625.6NV 15894.47 0.44 18687.03 73.41 306.81 7743.63 9711.18 N 12699.021N 15986.49 0.80 18782.25 73.58 306.22 7770.68 9765.50 N 12772.4C1N 16077.77 0.62 18877.41 73.67 306.48 7797.51 9819.62 N 12845.9~IIV 16169.05 0.28 18974.84 73.71 306.52 7824.87 9875.24 N 12921.1 C1N 16262.54 0.06 19071.60 73.65 306.54 7852.06 9930.51 N 12995.7~V11 16355.38 0.07 Job No.: AK-AM-0004721163 Well No.: NS33 PB1 End of Well Report Page 5 HALLIBURTON Sperry-Sun Directional Survey Data Measured Depth (feet) Inclination (degrees) Direction (degrees) Vertical Depth (feet) Latitude (feet) Departure (feet) Vertical Section (feet) Dogleg (deg/100ft) 19166.28 73.41 306.46 7878.90 9984.52 N 13068.7CW 16446.16 0.27 19265.63 73.09 306.87 7907.54 10041.3~N 13145.01W 16541.28 0.51 19362.44 72.18 307.53 7936.43 10097.1 ~N 13218.61W 16633.67 1.14 19458.34 71.85 308.71 7966.04 10153.5CN 13290.37W 16724.88 1.22 19554.73 70.73 309.10 7996.96 10210.8°N 13361.42411 16816.15 1.22 19649.40 70.76 309.11 8028.18 10267.21N 13430.77W 16905.50 0.03 19743.86 71.04 309.04 8059.09 10323.47N 13500.OEW 16994.73 0.30 19840.46 71.77 308.74 8089.89 10380.9EN 13571.321IV 17086.26 0.81 19938.70 72.04 308.84 8120.40 10439.4~N 13644.11W 17179.63 0.29 20035.05 71.78 308.77 8150.32 10496.8~N 13715.4EW 17271.20 0.28 20132.21 72.06 308.88 8180.48 10554.7~N 13787.44W 17363.54 0.31 20229.69 72.57 308.81 8210.09 10613.OCN 13859.77W 17456.39 0.53 20325.62 72.90 308.93 8238.56 10670.4~N 13931.1 CW 17547.98 0.36 20422.84 72.75 308.74 8267.27 10728.74N 14003.4NV 17640.84 0.24 20519.82 72.63 308.62 8296.12 10786.6CN 14075.721IV 17733.41 0.17 20573.72 72.57 308.72 8312.24 10818.74N 14115.8EW 17784.84 0.21 20669.17 72.70 308.20 8340.73 10875.4CN 14187.2~IV 17875.93 0.54 20765.43 72.85 308.56 8369.23 10932.4~N 14259.2NV 17967.86 0.39 20861.48 72.85 308.10 8397.56 10989.41N 14331.2NV 18059.64 0.46 20958.69 72.84 308.23 8426.23 11046.8CN 14404.3~1N 18152.52 0.13 21055.08 73.08 308.42 8454.48 11103.9~N 14476.621N 18244.67 0.31 21152.09 73.32 307.78 8482.51 11161.2EN 14549.7L1N 18337.54 0.68 21247.69 73.07 307.38 8510.15 11217.07N 14622.2~V11 18429.05 0.48 21345.46 72.48 305.70 8539.11 11272.67N 14697.2NV 18522.42 1.75 21442.44 71.91 304.46 8568.76 11325.74N 14772.81W 18614.66 1.35 21538.63 71.23 303.50 8599.17 11376.74N 14848.4EW 18705.72 1.18 21635.37 70.59 302.39 8630.81 11426.4EN 14925.2CW 18796.84 1.27 21731.19 69.77 302.44 8663.30 11474.78N 15001.2NV 18886.60 0.86 21828.59 69.10 304.36 8697.52 11524.97N 15077.42V11 18977.54 1.97 21924.27 68.82 305.80 8731.87 11576.2EN 15150.5CW 19066.75 1.43 22021.46 68.89 306.65 8766.93 11629.8EN 15223.6rIN 19157.37 0.82 22117.40 69.15 307.80 8801.28 11684.O~N 15294.9NV 19246.94 1.15 22213.97 69.42 308.92 8835.44 11740.11N 15365.7E1N 19337.26 1.12 22309.73 69.74 309.77 8868.85 11797.OCN 15435.1 EV11 19426.96 0.90 22405.91 70.07 310.72 8901.90 11855.3EN 15504.1 TIV 19517.19 0.99 22502.26 70.38 311.69 8934.50 11915.O~N 15572.3~V11 19607.68 1.00 22597.56 70.65 313.18 8966.29 11975.71N 15638.64W 19697.21 1.50 22694.07 70.29 313.57 8998.55 12038.17N 15704.7NV 19787.71 0.53 22792.15 68.94 314.79 9032.71 12102.24N 15770.6NV 19879.04 1.80 22888.19 67.65 315.00 9068.23 12165.22N 15833.9CW 19967.56 1.36 Job No.: AK-AM-0004721163 Well No.: NS33 PB1 End of Well Report Page 6 HALLIBURTON Sperry-Sun Directional Survey Data Measured Inclination Direction Vertical Latitude Departure Vertical Dogleg Depth Depth Section (feet) (degrees) (degrees) (feet) (feet) (feet) .(feet) (deg/100ft) 22984.42 66.28 314.34 9105.89 12227.4~N 15896.87dV 20055.45 1.56 23080.29 65.22 313.28 9145.26 12287.9EN 15959.94W 20142.35 1.50 23177.00 64.36 312.75 9186.45 12347.6EN 16023.9~1N 20229.46 1.02 23236.00 64.36 312.75 9211.98 12383.7EN 16062.9EW 20282.44 0.00 Job No.: AK-AM-0004721163 Well No.: NS33 P61 End of Well Report Page 7 PB-2 HALLIBURTON Sperry-Sun Directional Survey Data Measured Depth (feet) Inclination (degrees) Direction (degrees) Vertical Depth (feet) Latitude (feet) Departure (feet) Vertical Section (feet) Dogleg (deg/100ft) 50.00 0.70 18.25 50.00 0.29N 0.10E 0.10 TIE-IN 100.00 0.62 18.15 100.00 0.84N 0.28E 0.30 0.16 150.00 0.82 18.87 149.99 1.43N 0.48E 0.51 0.40 208.00 1.14 324.05 207.98 2.29N 0.27E 1.19 1.63 304.00 2.81 285.74 303.93 3.70N 2.55W 4.29 2.13 401.00 3.96 293.87 400.76 5.70N 7.91 W 9.74 1.28 497.00 6.90 301.08 496.32 10.02N 15.88W 18.69 3.14 601.00 9.54 304.47 599.24 18.13N 28.34W 33.49 2.58 697.00 10.57 307.34 693.76 27.97N 41.90W 50.24 1.19 792.00 11.04 314.28 787.08 39.61 N 55.34W 67.99 1.46 889.00 13.58 313.64 881.85 53.95N 70.23W 88.56 2.62 984.00 16.40 309.47 973.61 70.18N 88.66W 113.07 3.18 1107.67 19.19 310.74 1091.35 94.55N 117.54W 150.83 2.28 1200.87 20.23 307.72 1179.09 114.40N 141.89W 182.24 1.56 1297.20 17.22 306.36 1270.31 133.05N 166.56W 213.16 3.16 1392.14 17.76 308.97 1360.86 150.49N 189.13W 241.68 1.00 1489.08 19.49 308.60 1452.72 169.88N 213.27W 272.64 1.79 1583.76 22.65 295.86 1541.11 187.70N 242.04W 306.29 5.86 1679.62 25.69 300.32 1628.56 206.24N 276.59W 344.95 3.70 1775.18 28.20 303.38 1713.74 229.13N 313.34W 388.00 3.00 1871.48 29.67 303.16 1798.02 254.68N 352.29W 434.43 1.53 1965.18 31.78 303.78 1878.56 281.09N 392.22W 482.16 2.28 2063.06 32.73 305.75 1961.34 310.88N 435.12W 534.31 1.45 2157.37 34.74 304.82 2039.77 341.13N 477.87W 586.63 2.20 2253.42 37.38 304.31 2117.41 373.19N 524.43W 643.06 2.77 2347.98 40.28 303.68 2191.06 406.33N 573.59W 702.21 3.10 2444.14 43.23 303.68 2262.79 441.84N 626.87W 766.06 3.07 2538.11 44.38 303.92 2330.61 478.03N 680.92W 830.94 1.24 2634.34 46.29 303.90 2398.25 516.21N 737.72W 899.21 1.98 2729.10 49.05 304.09 2462.05 555.37N 795.79W 969.10 2.92 2824.67 51.49 304.31 2523.14 596.69N 856.58W 1042.44 2.56 2918.45 54.73 304.69 2579.42 639.17N 918.38W 1117.30 3.47 3013.08 56.67 305.69 2632.75 684.22N 982.26W 1195.38 2.23 3107.78 58.29 307.05 2683.66 731.58N 1046.55W 1275.20 2.10 3204.32 60.50 307.14 2732.80 781.69N 1112.82W 1358.28 2.29 3299.88 61.24 306.69 2779.32 831.83N 1179.56W 1441.74 0.88 3395.36 63.15 307.33 2823.86 882.67N 1246.99W 1526.18 2.09 3492.63 65.24 306.99 2866.20 935.56N 1316.78W 1613.73 2.17 3588.44 67.89 307.18 2904.30 988.56N 1386.90W 1701.62 2.77 3685.50 69.42 307.17 2939.63 1043.19N 1458.93W 1792.02 1.58 Job No.: AK-AM-0004888594 Well No.: NS33 P61 End of Well Report Page 10 HALLIBURTON Sperry-Sun Directional Survey Data Measured Depth (feet) Inclination (degrees) Direction (degrees) Vertical Depth (feet) Latitude (feet) Departure (feet) Vertical Section (feet) Dogleg (deg/100ft) 3780.68 71.96 308.29 2971.10 1098.15N 1529.96W 1881.83 2.89 3876.89 72.34 306.40 3000.59 1153.70N 1602.76W 1973.40 1.91 3973.27 71.34 305.49 3030.63 1207.46N 1676.90W 2064.93 1.37 4069.13 70.63 306.64 3061.86 1260.81 N 1750.16W 2155.50 1.35 4164.91 69.97 306.70 3094.15 1314.66N 1822.48W 2245.66 0.69 4260.68 70.28 305.65 3126.71 1367.82N 1895.19W 2335.68 1.08 4357.16 71.46 305.77 3158.33 1421.03N 1969.20W 2426.76 1.23 4419.22 71.45 306.12 3178.07 1455.57N 2016.83W 2485.57 0.53 4549.84 72.93 304.83 3218.02 1527.73N 2118.10W 2609.81 1.47 4644.51 72.51 304.53 3246.14 1579.16N 2192.44W 2700.06 0.54 4741.10 71.93 304.18 3275.63 1631.07N 2268.37W 2791.86 0.69 4836.57 71.53 303.67 3305.56 1681.67N 2343.60W 2882.30 0.66 4932.10 68.50 304.40 3338.21 1731.90N 2417.99W 2971.86 3.25 5025.96 67.01 303.55 3373.74 1780.45N 2490.03W 3058.52 1.80 5122.44 69.31 304.05 3409.63 1830.27N 2564.44W 3147.84 2.43 5216.38 70.66 306.15 3441.79 1881.03N 2636.64W 3235.99 2.54 5312.87 70.92 306.71 3473.53 1935.13N 2709.95W 3327.08 0.61 5407.43 71.34 307.96 3504.12 1989.40N 2781.09W 3416.55 1.33 5503.39 71.91 307.63 3534.37 2045.21 N 2853.06W 3507.62 0.68 5596.99 72.44 306.94 3563.02 2099.19N 2923.95W 3596.72 0.90 5694.64 72.64 307.22 3592.32 2155.35N 2998.27W 3689.86 0.34 5789.14 71.29 307.01 3621.58 2209.57N 3069.92W 3779.71 1.44 5884.00 70.30 307.40 3652.78 2263.74N 3141.27W 3869.28 1.11 5978.34 69.95 308.15 3684.85 2318.08N 3211.39W 3958.00 0.83 6074.58 70.12 309.43 3717.71 2374.75N 3281.90W 4048.44 1.26 6170.41 70.28 311.10 3750.18 2433.02N 3350.70W 4138.53 1.65 6265.74 70.31 310.90 3782.32 2491.90N 3418.43W 4228.14 0.20 6360.36 70.61 311.11 3813.97 2550.41 N 3485.72W 4317.18 0.38 6455.96 70.83 311.59 3845.53 2610.03N 3553.46W 4407.26 0.53 6550.05 70.85 311.66 3876.41 2669.07N 3619.90W 4495.95 0.07 6645.97 70.89 312.05 3907.85 2729.53N 3687.40W 4586.36 0.39 6739.57 70.49 312.16 3938.80 2788.76N 3752.93W 4674.46 0.44 6837.35 71.23 312.74 3970.86 2851.11 N 3821.09W 4766.54 0.94 6932.26 71.74 310.90 4001.00 2911.11 N 3888.16W 4856.32 1.92 7028.96 72.17 309.22 4030.96 2970.28N 3958.53W 4948.20 1.71 7123.95 71.44 307.13 4060.62 3026.06N 4029.46W 5038.43 2.23 7219.63 71.07 306.21 4091.37 3080.17N 4102.13W 5129.01 0.99 7316.13 70.65 305.64 4123.01 3133.66N 4175.96W 5220.12 0.71 7412.82 71.19 306.62 4154.62 3187.54N 4249.76W 5311.46 1.11 7509.44 70.64 307.21 4186.21 3242.38N 4322.76W 5402.75 0.81 Job No.: AK-AM-0004888594 Well No.: NS33 P61 End of Well Report Page 11 HALLIBURTON Sperry-Sun Directional Survey Data Measured Depth (feet) Inclination (degrees) Direction (degrees) Vertical Depth (feet) Latitude (feet) Departure (feet) Vertical Section (feet) Dogleg (deg/100ft) 7605.93 71.88 308.73 4217.21 3298.60N 4394.79W 5494.12 1.97 7700.90 71.02 308.49 4247.42 3354.78N 4465.14W 5584.15 0.94 7797.40 72.19 308.31 4277.87 3411.66N 4536.91 W 5675.71 1.23 7893.09 72.17 305.76 4307.16 3466.52N 4609.62W 5766.79 2.54 7989.93 71.63 304.37 4337.25 3519.40N 4684.96W 5858.72 1.47 8085.80 71.31 304.51 4367.72 3570.81 N 4759.92W 5949.46 0.36 8182.54 70.94 306.30 4399.01 3623.84N 4834.53W 6040.90 1.79 8278.96 70.89 307.94 4430.54 3678.83N 4907.19W 6132.01 1.61 8375.87 71.04 309.37 4462.15 3736.05N 4978.72W 6223.61 1.40 8473.24 71.28 309.82 4493.59 3794.78N 5049.73W 6315.72 0.50 8570.30 71.41 309.93 4524.64 3853.74N 5120.31 W 6407.63 0.17 8666.53 71.41 309.71 4555.31 3912.15N 5190.36W 6498.79 0.22 8763.43 71.27 309.92 4586.32 3970.94N 5260.88W 6590.55 0.25 8860.74 71.55 310.73 4617.34 4030.62N 5331.20W 6682.70 0.84 8957.60 71.95 310.33 4647.67 4090.40N 5401.11 W 6774.59 0.57 9053.76 72.16 310.11- 4677.30 4149.47N 5470.97W 6866.00 0.31 9151.80 72.25 309.92 4707.26 4209.49N 5542.46W 6959.28 0.21 9245.98 72.09 308.62 4736.10 4266.24N 5611.87W 7048.91 1.32 9342.91 71.93 308.46 4766.04 4323.68N 5683.98W 7141.10 0.23 9438.47 72.03 308.19 4795.60 4380.04N 5755.27W 7231.97 0.29 9535.10 72.11 307.85 4825.35 4436.66N 5827.69W 7323.90 0.34 9631.99 71.35 307.66 4855.72 4493.OON 5900.44W 7415.91 0.81 9727.10 71.29 308.51 4886.18 4548.57N 5971.35W 7506.01 0.85 9821.98 71.96 308.44 4916.09 4604.59N 6041.84W 7596.04 0.71 9917.63 72.20 308.05 4945.52 4660.93N 6113.32W 7687.05 0.46 10014.11 72.37 307.39 4974.88 4717.16N 6186.02W 7778.96 0.68 10108.88 72.15 305.98 5003.76 4771.08N 6258.40W 7869.20 1.44 10205.59 72.00 305.86 5033.52 4825.06N 6332.92W 7961.16 0.19 10303.39 71.82 305.75 5063.89 4879.45N 6408.31 W 8054.06 0.21 10369.58 71.61 305.82 5084.66 4916.20N 6459.30W 8116.86 0.33 10466.92 71.25 305.76 5115.66 4970.16N 6534.15W 8209.07 0.37 10561.56 70.75 306.78 5146.47 5023.10N 6606.29W 8298.52 1.15 10657.88 70.53 307.47 5178.40 5077.95N 6678.74W 8389.38 0.71 10753.55 70.95 308.27 5209.96 5133.39N 6750.04W 8479.70 0.90 10849.33 71.18 308.83 5241.04 5189.85N 6820.89W 8570.29 0.60 10943.42 70.49 309.50 5271.93 5245.98N 6889.80W 8659.14 1.00 11039.36 70.97 309.75 5303.59 5303.74N 6959.55W 8749.66 0.56 11133.65 71.81 310.13 5333.68 5361.10N 7028.07W 8838.97 0.97 11230.99 72.25 309.70 5363.71 5420.52N 7099.08W 8931.50 0.62 11324.52 71.95 309.61 5392.46 5477.31 N 7167.61 W 9020.46 0.33 Job No.: AK-AM-0004888594 Well No.: NS33 PB1 End of Well Report Page 72 HALLI~URTON Sperry-Sure Directional Survey Data Measured Depth (feet) Inclination (degrees) Direction (degrees) Vertical Depth (feet) Latitude (feet) Departure (feet) Vertical Section (feet) Dogleg (deg/100ft) 11420.47 71.09 309.96 5422.87 5535.55N 7237.54W 9111.42 0.96 11513.95 71.34 309.82 5452.97 5592.30N 7305.44W 9199.86 0.30 11610.41 71.74 309.71 5483.51 5650.83N 7375.77W 9291.31 0.43 11704.45 71.18 309.07 5513.42 5707.41 N 7444.68W 9380.44 0.88 11801.85 71.07 308.05 5544.93 5764.86N 7516.74W 9472.60 1.00 11896.42 70.67. 307.24 5575.92 5819.43N 7587.49W 9561.94 0.91 11992.21 70.63 307.10 5607.66 5874.03N 7659.51 W 9652.31 0.14 12086.53 69.77 307.40 5639.61 5927.75N 7730.15W 9741.05 0.96 12173.76 69.48 306.92 5669.98 5977.14N 7795.31 W 9822.81 0.61 12267.63 71.06 306.77 5701.67 6030.12N 7866.02W 9911.16 1.69 12362.38 72.05 307.92 5731.64 6084.65N 7937.47W 10001.03 1.55 12457.77 72.08 307.69 5761.02 6140.28N 8009.18W 10091.79 0.23 12553.83 72.13 306.81 5790.54 6195.61 N 8081.94W 10183.19 0.87 12647.84 72.14 305.84 5819.38 6248.61 N 8154.03W 10272.63 0.98 12743.86 72.71 304.84 5848.37 6301.56N 8228.70W 10364.08 1.16 12837.85 72.16 304.78 5876.73 6352.71 N 8302.27W 10453.55 0.59 12934.40 71.93 304.48 5906.50 6404.91 N 8377.85W 10545.25 0.38 13028.93 72.49 304.47 5935.38 6455.86N 8452.05W 10635.10 0.59 13125.17 71.67 304.58 5964.99 6507.76N 8527.49W 10726.51 0.86 13227.59 71.81 305.14 5997.08 6563.35N 8607.30W 10823.63 0.54 13318.78 71.64 305.57 6025.68 6613.45N 8677.92W 10910.14 0.49 13414.41 71.65. 306.02 6055.79 6666.54N 8751.54W 11000.84 0.45 13510.61 71.97 307.04 6085.82 6720.94N 8824.98W 11092.20 1.06 13609.73 71.61 307.56 6116.80 6778.OON 8899.88W 11186.35 0.62 13704.22 71.58 308.55 6146.63 6833.26N 8970.47W 11276.01 0.99 13802.00 71.97 308.74 6177.21 6891.26N 9043.01 W 11368.88 0.44 13897.38 71.73 309.60 6206.93 6948.51 N 9113.28W 11459.49 0.89 13999.98 71.58 309.86 6239.22 7010.75N 9188.17W 11556.82 0.28 14089.86 71.66 308.99 6267.56 7064.92N 9254.06W 11642.09 0.92 14186.84 71.48 308.59 6298.22 7122.56N 9325.77W 11734.08 0.43 14283.28 71.73 307.75 6328.65 7179.11 N 9397.72W 11825.59 0.87 14380.03 71.51 307.06 6359.16 7234.89N 9470.65W 11917.40 0.71 14475.72 71.78 306.54 6389.29 7289.29N 9543.37W 12008.21 0.59 14572.77 71.67 306.00 6419.73 7343.81 N 9617.67W 12100.32 0.54 14669.46 71.90 304.86 6449.95 7397.05N 9692.51 W 12192.08 1.14 14766.64 71.94 305.35 6480.11 7450.18N 9768.08W 12284.35 0.48 14861.55 71.42 305.95 6509.94 7502.69N 9841.30W 12374.38 0.81 14958.70 71.31. 306.13 6540.99 7556.85N 9915.74W 12466.39 0.21 15055.87 71.30 305.50 6572.13 7610.71 N 9990.37W 12558.37 0.61 15151.77 71.19 304.89 6602.97 7663.05N 10064.5W 12649.08 0.61 Job No.: AK-AM-0004888594 Well No.: NS33 PB1 End of Well Report Page 13 HALLIBURTON Sperry-dun Directional Survey Data Measured Depth (feet) Inclination (degrees) Direction (degrees) Vertical Depth (feet) Latitude (feet) Departure (feet) Vertical Section (feet) Dogleg (deg/100ft) 15248.40 71.23 304.48 6634.09 7715.11 N 10139.8W 12740.41 0.40 15342.88 71.25 302.77 6664.48 7764.65N 10214.2W 12829.62 1.71 15439.97 71.50 302.07 6695.49 7813.97N 10291.9W 12921.20 0.73 15535.54 71.71 301.97 6725.64 7862.05N 10368.8W 13011.41 0.24 15632.25 71.33 300.97 6756.30 7909.94N 10447.OW 13102.55 1.06 15728.15 71.42 300.96 6786.93 7956.70N 10525.OW 13192.76 0.09 15824.87 71.38 301.51 6817.78 8004.23N 10603.3W 13283.81 0.54 15920.76 71.31 301.75 6848.45 8051.88N 10680.7W 13374.11 0.25 16017.14 71.48 302.46 6879.20 8100.42N 10758.1 W 13464.99 0.72 16113.70 71.21 303.37 6910.09 8150.14N 10834.9W 13556.13 0.94 16210.44 71.37 304.79 6941.12 8201.48N 10910.8W 13647.55 1.40 16308.76 71.31 306.79 6972.58 8255.95N 10986.3W 13740.63 1.93 16369.67 71.38 308.10 6992.06 8291.04N 11032.1 W 13798.33 2.04 16547.61 70.48 309.71 7050.20 8396.65N 11163.OW 13966.48 0.99 16662.53 70.19 311.00 7088.88 8466.72N 11245.5W 14074.59 1.09 16758.38 69.77 311.97 7121.69 8526.37N 11312.9W 14164.47 1.05 16853.22 69.86 313.08 7154.42 8586.54N 11378.5W 14253.20 1.10 16950.42 70.04 314.27 7187.74 8649.59N 11444.6W 14344.04 1.16 17046.27 70.37 315.14 7220.20 8713.04N 11508.7W 14433.60 0.92 17138.02 71.40 315.36 7250.25 8774.60N 11569.7W 14519.58 1.15 17235.62 71.43 314.48 7281.35 8839.92N 11635.2W 14611.39 0.86 17336.03 71.58 312.62 7313.21 8905.53N 11704.2W 14706.15 1.76 17422.08 71.52 311.71 7340.44 8960.32N 11764.7W 14787.55 1.01 17529.81 71.31 310.67 7374.78 9027.57N 11841.6W 14889.50 0.94 17627.09 71.19 309.80 7406.05 9087.07N 11911.9W 14981.54 0.86 17723.71 70.68 309.31 7437.61 9145.22N 11982.3W 15072.82 0.71 17819.18 70.19 309.15 7469.58 9202.12N 12052.OW 15162.75 0.54 17917.63 70.34 308.78 7502.82 9260.39N 12124.OW 15255.40 0.39 18013.17 70.79 309.00 7534.61 9316.95N 12194.1 W 15345.49 0.52 18107.09 70.74 308.47 7565.55 9372.44N 12263.3W 15434.15 0.54 18204.35 71.31 308.48 7597.18 9429.67N 12335.3W 15526.12 0.59 18300.55 71.64 308.14 7627.74 9486.21 N 12406.9W 15617.34 0.48 18398.38 72.10 307.72 7658.19 9543.36N 12480.2W 15710.31 0.62 18494.69 72.66 307.78 7687.34 9599.56N 12552.8W 15802.10 0.58 18590.89 72.93 307.44 7715.79 9655.64N 12625.6W 15893.99 0.44 18687.03 73.41 306.81 7743.63 9711.18N 12699.OW 15986.01 0.80 18782.25 73.58 306.54 7770.68 9765.71 N 12772.2W 16077.28 0.33 18877.41 73.67 306.48 7797.51 9820.03N 12845.6W 16168.55 0.11 18974.84 73.71 306.52 7824.87 9875.65N 12920.8W 16262.03 0.06 19071.60 73.65 306.54 7852.06 9930.92N 12995.4W 16354.87 0.07 Job No.: AK-AM-0004888594 Well No.: NS33 PB1 End of Well Report Page 14 HALLIBURTON Sperry-Sun Directional Survey Data Measured Depth (feet) Inclination (degrees) Direction (degrees) Vertical Depth (feet) Latitude (feet) Departure (feet) Vertical Section (feet) Dogleg (deg/100ft) 19166.28 73.41 306.46 7878.90 9984.93N 13068.4W 16445.64 0.27 19265.63 73.09 306.87 7907.54 10041.7N 13144.7W 16540.75 0.51 19362.44 72.18 307.53 7936.43 10097.6N 13218.3W 16633.14 1.14 19458.34 71.85 308.71 7966.04 10153.9N 13290.OW 16724.35 1.22 19554.73 70.73 309.10 7996.96 10211.2N 13361.1 W 16815.63 1.22 19649.40 70.76 309.11 8028.18 10267.6N 13430.4W 16904.98 0.03 19743.86 71.04 309.04 8059.09 10323.8N 13499.7W 16994.22 0.30 19840.46 71.77 308.74 8089.89 10381.3N 13571.OW 17085.77 0.81 19938.70 72.04 308.84 8120.40 10439.8N 13643.8W 17179.14 0.29 20035.05 71.78 308.77 8150.32 10497.2N 13715.1 W 17270.71 0.28 20132.21 .72.06 308.88 8180.48 10555.1 N 13787.1 W 17363.07 0.31 20229.69 72.57 308.81 8210.09 10613.4N 13859.4W 17455.93 0.53 20325.62 72.90 308.93 8238.56 10670.9N 13930.7W 17547.52 0.36 20422.84 72.75 308.74 8267.27 10729.1 N 14003.1 W 17640.39 0.24 20519.82 72.63 308.62 8296.12 10787.ON 14075.4W 17732.97 0.17 20573.72 72.57 308.72 8312.24 10819.1 N 14115.5W 17784.40 0.21 20669.17 72.70 308.20 8340.73 10875.8N 14186.9W 17875.50 0.54 20765.43 72.85 308.56 8369.23 10932.9N 14258.9W 17967.44 0.39 20861.48 72.85 308.10 8397.56 10989.8N 14330.9W 18059.21 0.46 20958.69 72.84 308.23 8426.23 11047.2N 14404.OW 18152.10 0.13 21055.08 73.08 308.42 8454.48 11104.3N 14476.3W 18244.25 0.31 21152.09 73.32 307.78 8482.51 11161.6N 14549.4W 18337.12 0.68 21247.69 73.07 307.38 8510.15 11217.4N 14621.9W 18428.64 0.48 21345.46 72.48 305.70 8539.11 11273.ON 14696.9W 18521.99 1.75 21442.44 71.91 304.76 8568.76 11326.3N 14772.3W 18614.22 1.09 21538.63 71.23. 303.80 8599.17 11377.7N 14847.7W 18705.29 1.18 21635.37 70.59 302.39 8630.81 11427.6N 14924.3W 18796.39 1.53 21731.19 69.77 302.73 8663.30 11476.1 N 15000.3W 18886.14 0.92 21828.59 69.10 304.36 8697.52 11526.5N 15076.3W 18977.06 1.71 21924.89 68.05 306.47 8732.70 11578.5N 15149.3W 19066.62 2.31 22021.33 66.64 306.32 8769.84 11631.3N 15221.OW 19155.58 1.47 22117.75 66.31 307.89 8808.33 11684.6N 15291.5W 19243.97 1.53 22213.99 65.91 308.53 8847.31 11739.ON 15360.6W 19331.97 0.74 22310.02 65.15 310.08 8887.09 11794.4N 15428.3W 19419.34 1.67 22406.40 63.76 310.31 8928.65 11850.5N 15494.7W 19506.23 1.46 22503.61 62.77 311.04 8972.38 11907.1 N 15560.5W 19592.94 1.22 22599.46 62.28 311.22 9016.60 11963.ON 15624.6W 19677.85 0.54 22695.78 61.94 312.13 9061.66 12019.6N 15688.2W 19762.80 0.91 22792.33 61.84 312.83 9107.15 12077.1 N 15751.OW 19847.69 0.65 22888.93 62.26 312.79 9152.42 12135.1 N 15813.6W 19932.71 0.44 Job No.: AK-AM-0004888594 Well No.: NS33 PB7 End of Well Report Page 15 HALLIBURTON Sperry-Sun Directional Survey Data Measured Inclination Direction Vertical Latitude Departure Vertical Dogleg Depth Depth Section (feet) (degrees) (degrees) (feet) (feet) (feet) (feet) (deg/100ft) 22985.13 61.44 313.22 9197.81 12193.ON 15875.6W 20017.19 0.94 23082.12 59.98 313.08 9245.26 12250.8N 15937.3W 20101.43 1.51 23178.16 58.58 312.52 9294.32 12306.9N 15997.9W 20183.69 1.54 23273.16 57.18 312.36 9344.83 12361.2N 16057.3W 20263.89 1.48 23370.08 55.69 311.41 9398.41 12415.1 N 16117.4W 20344.45 1.74 23402.49 55.03 311.28 9416.83 12432.8N 16137.4W 20371.07 2.06 23460.00 55.03 31.1.28 9449.80 12463.8N 16172.8W 20418.11 0.00 Job No.: AK-AM-0004888594 Well No.: NS33 P61 End of Well Report Page 16 HALLIBURTON Sperry-dun Directional Survey Data CALCULATION BASED ON Minimum Curvature METHOD SURVEY COORDINATES RELATIVE TO WELL SYSTEM REFERENCE POINT TVD VALUES GIVEN RELATIVE TO DRILLING MEASUREMENT POINT VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION IS COMPUTED ALONG A DIRECTION OF 307.91 DEGREES (TRUE) A TOTAL CORRECTION OF 24.10 DEG FROM MAGNETIC NORTH TO TRUE NORTH HAS BEEN APPLIED HORIZONTAL DISPLACEMENT IS RELATIVE TO THE WELL HEAD. HORIZONTAL DISPLACEMENT(CLOSURE) AT 23460.00 FEET IS 20418.38 FEET ALONG 307.62 DEGREES (TRUE) Surveys Provided by Schlumberger Job No.: AK-AM-0004888594 Well No.: NS33 PB1 End of Well Report Page 17 0 2,000 4,000 6,000 8,000 10,000 = 12,000 H a W p 14,000 W N w 16,000 18,000 20,000 22,000 24,000 26,000 28,000 0 p an z NS-33 PB1 DAYS -vs- DEPTH 42 Hours to NU BOP (w/o Sweeney Wrench) 8 Hours resting BOP - - - AFE Days -vs- Depth F b 1 Actual Days -vs- Depth e ~ I - - - Projected Days -vs- Depth d LL NS21 Days -vs- Depth - - - AK's Deepest Well: NK11 I ~ADEC Date I I I I I Wipe r Trip t o the sh oe: extr a 8 Hrs I I I I PowerDrive Failed: 80 Hrs I I I I d c 3 7 I No n-Mag Washout: 61 Hrs ~; i I ~ Plant Start Up: 21 Hrs o ~ Wellhead Problem: 24 Hrs O BHA Problem 63 Hrs v w 1 1 0 a i Short Trip for DP MGNT 34 Hrs 1 NS21 22,268' TMD Apr 2 0 for BOP Test and Short Tri ~ p ~ Inadvertent Sidetrack XX Hrs Dee pest Well in ~ _ ~ Ala ska: NK11 - - - - ~ - M 31 -- -- -- ---- 23 ,885'TMD ~ ar ~ J une 1 ~ Apr 2 4 33E 127 Days 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 DAYS 0 2,000 4,000 s,000 8,000 10,000 = 12,000 H a w 0 p 14,000 w W 1 s,000 18,000 20,000 22,000 24,000 2s,ooo 28,000 ra n ~y NS-33 PB2 DAYS -vs- DEPTH 42 Hours to NU BOP (w/o Sweeney Wrench) 8 Hours Testing BOP - - - AFE Days -vs- Depth -Feb 14 Actual Days -vs- Depth ~ LL i - - -Projected Days -vs- Depth NS21 Days -vs- Depth - - -AK's Deepest Well: NK11 I I I I ~ W I iper Trip t o the sho e: extra 8 Hrs I I PowerD rive Faile d: 80 Hrs t I I I ~ I No n-Mag Washout: 61 Hrs ~ Plant Start Up: 21 Hrs Wellhead Problem: 2 4 Hrs BHA Probl em 63 Hrs \ 1 ~ ~ \ \ \ \ Short Trip for D P MGNT 34 Hrs 1 1 NS21 22,268' TM D Short Trip for BOP Te st and Deep Ala est Well in ska: NK11 -- - \ 1 \ --- Mar 28 \ -- -- Inadvertent Sidetrack Apr 7 1 --- -- --- XX Hrs 23, 885' TMD \ \ Apr 13 Apr 23 May 6 d ~ ~ _ __ __ P-10 63 Days P 80 -50 Days 1 33E 02 Days 0 10 20 30 40 50 s0 70 DAYS 80 90 100 110 120 B. P. EXPLORATION, INC. by NORTHSTAR NS33 PB-1 & PB-2 API# 50-029-23325.00 ®ATA C B.P.EXPLORATION, INC. by NORTHSTAR NS33 PB-1 & PB-2 API# 50-029-23325.00 ®ATA CD B.P.EXPLQRATION, INC. by NORTHSTAR NS33 PB-1 & PB-2 API# 50-029-23325.00 N!D " F~Rl~/fATlC~N E~/ALIJATIC~N LAGS