Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout189-054
) STATE OF ALASKA ')
ALASKA ûlL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
No. of Completions
1a. Well Status: 0 Oil 0 Gas 0 Plugged a Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
0 GINJ 0 WINJ 0 WDSPL
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
1437' SNL, 1194' WEL, SEC. 21, T11N, R12E, UM
Top of Productive Horizon:
1262' SNL, 5220' WEL, SEC. 33, T11N, R12E, UM
Total Depth:
1561' SNL, 265' WEL, SEC. 32, T11N, R12E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 612049 y- 5958820 Zone- ASP4
TPI: x- 608202 y- 5948378 Zone- ASP4
Total Depth: x- 607882 y- 5948075 Zone- ASP4
18. Directional Survey 0 Yes a No
21. Logs Run:
DIL 1 BHC 1 CNL 1 GR
Zero Other
5. Date Comp., Susp., or Aband.
6/8/2004
6. Date Spudded
05127/1989
7. Date T.D. Reached
06/21/1989
8. KB Elevation (ft):
90.66'
9. Plug Back Depth (MD+ TVD)
15306 + 9129
10. Total Depth (MD+TVD)
15430 + 9199
11. Depth where SSSV set
N/A MD
19. Water depth, if offshore
N/A MSL
1b. Well Class:
a Development 0 Exploratory
0 Stratigraphic 0 Service
12. Permit to Drill Number
189-054 304-206
13. API Number
50- 029-21947-00-00
14. Well Name and Number:
PBU W-09
15. Field 1 Pool(s):
Prudhoe Bay Field 1 Prudhoe Bay
Pool
Ft
Ft
16. Property Designation:
ADL 047453
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Approx.)
CASING'
$llË.
20"
Wli>pÉRFT;
Conductor
68#
47#
17#
CASING, LINER AND CEMENTING RECORD
\ SETTINQD~~H~P~~ETIIf.J$DE~TH1;VI;!' '.. 'HO.~~'
G~DE, Top" 'BC>1'TOM..Tè)p'. Bo;rroM' "SIZE'
Surface 110' Surface 110'
L-80 Surface 3264' Surface 2650' 17-1/2" 4500 cu ft Coldset 11,62 cu ft AS I
L-80 1 NT80S Surface 14638' Surface 8753' 12-1/4" 3212 cu ft Class 'G'
L-80 14359' 15428' 8596' 9198' 8-1/2" 536 cu ft Class 'G'
22.
13-3/8"
9-518"
5-1/2"
23. Perforations oRen to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
None
MD
TVD
MD
SCANNEJ) NO\ll 8 200t).
26.
Date First Production:
Not on Production
Date of Test Hours Tested
24:
SIZE
N/A
TVD
'. QE;M,$NTING RFCORD
AMOUNT
PULLED,'"
, TUBING RECORD
DEPTH SET (MD)
PACKER SET (MD)
25. ACID,FAACTURE, ,CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
14725' P&A with 25.5 Bbls Class 'G', Sqz to 1000 psi
14725' Set Whipstock
GAs-McF
W A TER-BBl
CHOKE SIZE
GAS-Oil RATIO
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
N/A
PRODUCTION FOR Oll-BBl
TEST PERIOD ~
Flow Tubing Casing Pressure CALCULATED....... Oll-BBl
Press. 24-HoUR RATE7
GAs-McF
W A TER-BBl
Oil GRAVITY-API (CORR)
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none". NOV 1 ~ 2004
27.
None
RBDMS BFL NOV 1 tjD~ I GIN A L
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
GF
..
28.
)
29.
)
FORMATION TESTS
GEOLOGIC MARKERS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Sag River
14649'
8759'
None
Shublik A
14675'
8774'
Sadlerochit 1 Zone 4
14897'
8899'
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble /féi'!V\i 0 . ~ Title Technical Assistant Date I ¡ . It- DL{
PBU W -09 189-054 304-206 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit NO.1 Approval No. Drilling Engineer: Thomas Schaefer, 564-4685
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical ~hickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 1 0-407 Revised 12/2003
SCANNED NO\! 1 ß ¿(]tJ4
Submit Original Only
)
)
Well:
Field:
API:
Permít:
W -09A
Prudhoe Bay Unit
50-029-21947-01-00
204-102
Accept:
Spud:
Release:
Rig:
07/02/04
07/26/04
08/18/04
Doyon 16
PRE-RIG WORK
06/02104
SET 4.5" XN CATCHER 14207' SLM. PULL 1.5" OGLV WI RA LATCH FROM STA # 1 @ 14207' SLM.
CATCHER APPEARS TO BE SET RIGHT AT THE BOTTOM OF #1 GLM. PULLED 1.5" LGLV WI RA LATCH
FROM STA #3 @ 8679' SLM. PULLED 1.5" LGLV WI RA LATCH FROM STA #2 @ 11909' SLM.
06/03/04
PULLED LGLV FROM STA # 4, (4141 MD) 4105 SLM. SET DMY GLV IN STA #4 AT 4105 SLM.
06/04/04
SET DGLV IN STA #3 (8670) SLM, (8724) MD.
06/05/04
RIGGING UP FINISH DMY'ING OFF GLM'S.
06/06/04
RAN 41/2 OM-1, JC3 RT, & RM/DGLV. ATTEMPT SET STA# 2 @ 11,909' SLM. VLV CAME BACK-
METAL DEBRIS MARKS ON PKG, VLV BODY & NO-GO. RAN POCKET BRUSH ON OM-1 KCKVR TO STA# 2
@ 11,914' SLM BRUSHED POCKET, POH. PULLED 4.5" C-SUB @ 14,224' SLM. PULLED PXN PRONG @
14,229' SLM. SET DGLV IN STA #1 AT 14,219' SLM, (14,246' MD). RUNNING IN THE HOLE WITH DGLV STA
#2.
06/07/04
SET RM/DGLV IN STA# 2 @ 11,919' SLM. MITIA FAILED- SEE LRS PUMPING REPORT. RAN 2.25 GAUGE
RING, KJ, KJ, 4 1/2 BLB. BRUSHED STA'S 4,3,2, & 1. TAGGED PLUG @ 14,245' SLM. RAN 4.5" GS PULLED
PX PLUG BODY @ 14249' SLM. RAN 3.25" CENT. WI 1.25" SAMPLE BAILER, SAT DOWN @ 14969' SLM,
(14,994' MD). RIG DOWN.
06/08/04
MU AND RIH WI 2.33" OD BDJSN. TAG @ 15005'. KILL WELL WITH 1% KCL. CAP WELL WITH CRUDE. LAY
IN 25.5 BBLS OF 15.8 PPG "G" CEMENT FROM 14995 AT 1:1. CLOSE CHOKE AND SQUEEZE WITH NOZZLE
ABOVE PERFS. LAY IN REMAINING CEMENT TO EST. TOC OF 14500'. SQUEEZE TO 1000 PSI WHP. EST.
13.7 BBLS BEHIND PIPE. CONTAMINATE AND CLEAN OUT TO 14750' CTM. POOH AT 50 TO 80%. MAKE
CLEANING PASSES AT CHEM CUT DEPTH AND JEWELRY. FREEZE PROTECT WELL TO 2500' WITH 50/50
METH. TRAPPED 570 PSI WHP. LEFT TOC - 14750' CTM. NOTIFY PAD OP OF WELL STATUS. JOB
COMPLETE.
06/09/04
RAN 3.705" CENT & 1.25" SAMPLE BAILER, TOC @ 14609' SLM, HARD BOTTOM, NO SAMPLE. TRACES OF
CEMENT ON CENT & TOOLS. ATTEMPTING PRESSURE TEST ON CEMENT PLUG.
06/10/04
ATTEMPTED TO PRESSURE TEST CEMENT PLUG. DECISION WAS MADE TO CALL LITTLE RED.
06/11/04
SHOT STRING SHOT 14199' TO 14211' AND TUBING PUNCH 14310' TO 14312' CORRELATED TO CAMCO
JEWELRY LOG DATED 21 SEP 1991. CONTINUED TO 6/12 FOR SECOND TP AND CHEM CUT. BOTTOM
NOT TAGGED.
SCANNED NO\ll a 2.00!1
W-09A Pre-Rig Summary for ~. .Jtracking Operations
Page 2
)
06/12/04
CUT 4.5" TUBING AT 14210' WITH 3-5/8" CHC. SHOT 2' 6SPF TUBING PUNCH 14170'-14168'. STUCK
CHEMICAL CUTTER STRING AFTER FIRING. LIKELY ANCHORS GOT STUCK AND DID NOT RETRACT. TOP
OF FISH AT 14184' WITH MH-22 HEAD AS FISHING NECK. BRF3 CHEMICAL TUBES ARE DOWNHOLE IN
STRING. CALL SCHLUMBERGER WIRELlNE WHEN RETRIEVED BY FISHING CREW (SL) FOR RIG DOWN.
rD NOT TAGGED. WELL LEFT SHUT IN. FINAL PRESS: 500/1400/50.
06/13/04
RUN 2" JD PULLING TOOL IN 3.70 BELLGUIDE TO 14,117' WLM. RECOVERD FISH, E-LlNE TOOLSTRING /
CHEM. CUTTER. RETURNED WELL TO PAD OP.
SC/\NNED NOV 1 8 ¿O
)
)
BP Exploration
Operations Summary Report
Page 1 t8
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-09
W-09
REENTER+COMPLETE
DOYON
DOYON 16
Start: 7/2/2004
Rig Release: 8/18/2004
Rig Number:
Spud Date:
End:
Date From - To Hours Task Code NPT Phase Description of Operations
7/2/2004 12:00 - 15:00 3.00 RIGU P PRE Move rig from W-11 to W-09. Spot rig over W-09. Shim and
berm rig. RU over W-20. Spot slop tank.
RIG ACCEPTED @ 15:00 hrs.
15:00 - 15:30 0.50 WHSUR P DECOMP Pre-spud mtg with all rig personnel.
15:30 - 17:00 1.50 WHSUR P DECOMP Take on seawater. RU on tree and annulus to circulate
wellbore.
17:00 - 17:30 0.50 WHSUR P DECOMP PJSM with DSM and rig personnel on pulling BPV.
17:30 - 18:00 0.50 WHSUR P DECOMP RU DSM lubricator. Pull BPV. RD DSM. Tbg and annulus on
vacuum.
18:00 - 19:00 1.00 WHSUR P DECOMP Reverse circulate freeze protect out of tubing, 3bpm @ 375 psi
19:00 - 23:00 4.00 WHSUR P DECOMP Mix and pump 50 bbl detergent pill. Displace well with 1000 bbl
seawater, 5.5 bpm @ 580 psi.
Recovered: 150 bbl diesel
23:00 - 23:30 0.50 WHSUR P DECOMP RD pnd blow down lines.
23:30 - 00:00 0.50 WHSUR P DECOMP Bleed off well. Flow check - Static
7/3/2004 00:00 - 01 :00 1.00 WHSUR P DECOMP Install TWC, unable to pressure test. Pull TWC and change out
seal ring. Re-install TWC and pressure test to 1000 psi from
below.
01 :00 - 01 :30 0.50 WHSUR P DECOMP PJSM with FMC and rig personnel on nippling down tree and
adapter flange.
01 :30 - 02:30 1.00 WHSUR P DECOMP ND tree and adapter flange.
02:30 - 05:00 2.50 BOPSUP P DECOMP NU BOPE. Install HCR valves. Hook up choke & kill lines to
HCR valves. NU riser & flow line.
05:00 - 08:30 3.50 BOPSUR P DECOMP RU test equipment. Test BOPE - 250/3500 psi, annular
250/3500 psi. All tested for 5 min Hi/Low. Witness of test
waived by John Spaulding - AOGCC.
08:30 - 09:00 0.50 BOPSUF P DECOMP Blow down lines and RD BOP test equipment. LD test joint.
09:00 - 10:30 1.50 PULL DECOMP RU casing tongs and Cameo spooling unit.
10:30 - 11 :30 1.00 PULL DECOMP RU DSM lubricator and pull TWC. RD DSM lubricator.
11:30 -12:00 0.50 PULL P DECOMP RIH with landing joint and TDS crossover, screw into tbg
hanger 10-1/2 turns. BOLDS. PU 180k string weight and
unseat tbg hanger. Up weight w/ tbg 154k. Pull hanger to floor.
12:00 - 13:30 1.50 PULL P DECOMP RU circulating head and lines to 4-1/2. tbg. CBU, 10 bpm @
650 psi.
13:30 - 14:00 0.50 PULL P DECOMP Monitor well- static. PJSM on pulling and laying down 4-1/2"
tbg.
14:00 - 14:30 0.50 PULL DECOMP Breakout and LD landing joint. Terminate control lines.
Breakout and LD tbg hanger.
14:30 - 18:30 4.00 PULL P DECOMP POH, laying down 4-1/2" tbg, spooling up dual 1/4" control lines
with Cameo spooling unit.
18:30 - 19:00
19:00 - 00:00
0.50 PULL P
5.00 PULL P
Recovered:
57 - joints 4-1/2" tbg
Control line
3 - stainless steel bands.
29 -control line bands.
1 - Otis SSSV assembly.
3 - 4-1/2- tbg pups.
RD Camco spooling unit. LD Otis 4-1/2" SSSV assembly.
POH, laying down 4-1/2" tbg and completion jewelry.
DECOMP
DECOMP
Printed: 8/2312004 9:23:01 AM
5C/\NNE[) NO\! 1 8 ZUU(\
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
')
)
BP Exploration
Operations Summary Report
Page 2 tII8
W-09
W-09
REENTER+COMPLETE
DOYON
DOYON 16
Start: 7/2/2004
Rig Release: 8/18/2004
Rig Number:
Spud Date:
End:
From - To Hours Task Code NPT Phase
Description of Operations
7/3/2004
7/4/2004
19:00 - 00:00
00:00 - 04:30
5.00 PULL P
4.50 PULL P
DECOMP Midnight: 235 jts laid down.
DECOMP Continue POH laying down 4-1/2" tbg and completion jewelry.
Recovered:
357 - joints 4-1/2" tbg
3 - GLM assemblies
1 - 19.35' cut joint of tbg
Tubing stub @14220' KB
04:30 - 06:00 1.50 PULL P DECOMP RD 4-1/2" tbg equipment. Clear tools & scrub rig floor.
06:00 - 07:00 1.00 BOPSUR P DECOMP RIH with test joint and set test plug, RU test equipment. RILDS
on test plug. Test lower 2-7/8" X 5" variable pipe rams to 250
psi /3500 psi. BOLDS and pull test plug. Install wear bushing.
RD test equipment.
07:00 - 07:30 0.50 FISH P DECOMP PJSM with BOT and rig personnel on picking up BHA #1.
07:30 - 09:30 2.00 FISH P DECOMP PU AND MU BHA #1 to retrieve K-anchor.
09:30 - 11 :30 2.00 FISH P DECOMP RIH with BHA #1 picking up DP from pipe shed.
11 :30 - 13:00 1.50 FISH P DECOMP Rig service, cut and slip drill line
13:00 - 00:00 11.00 FISH P DECOMP Continue RIH with BHA #1 picking up DP from pipe shed.
Midnight depth: 11319'
7/5/2004 00:00 - 03:00 3.00 FISH P DECOMP Continue RIH with BHA #1 picking up DP from pipe shed.
03:00 - 03:30 0.50 FISH P DECOMP Stage pumps to 4.5 bpm @ 700 psi and establish baseline
parameters:
P/U 215k Ibs
S/O 140k Ibs
ROT 174k Ibs
Torque 8.5k ft-Ibs @ 40 rpm
Wash down from 14170', engage fish at 14202. Continue
down, no-go after swallowing 9 'of tbg. Slack off to 125k. Pick
up to 320k and trip jars to set grapples. Grapples slipped after
putting 15 turns RH torqe into tbg. Pick up to 350k and trip jars
to set grapples. K-anchor jarred free. RIH and tag up to verify
K-anchor is free.
03:30 - 05:00 1.50 FISH P DECOMP CBU, 10 bpm @ 2920 psi.
05:00 - 13:30 8.50 FISH P DECOMP POH with K-anchor.
13:30 - 16:00 2.50 FISH P DECOMP LD BHA #1 and fish
Recovered:
4 - 4-1/2. tbg pups
1- GLM
1 - Landing Nipple
1 - Cut joint of tbg
K -anchor
Total length = 68.65'
16:00 - 16:30 0.50 FISH P DECOMP PJSM with BOT and rig personnel on picking up and running
packer retreivaJ BHA.
16:30 - 17:30 1.00 FISH P DECOMP PU and MU BHA #2, packer picker
17:30 - 23:00 5.50 FISH P DECOMP RIH with BHA #2, break circulation every 30 stands.
23:00 - 23:30 0.50 FISH P DECOMP Stage pumps to 5.5 bpm @ 1030 psi and establish baseline
parameters:
SCANNEr) NO\} 1 B '2j)l)í}
Printed: 8/2312004 9:23:01 AM
)
)
Page 3 48Þ
BP .E)(ml~rÇltio.t1
Operations Summary Report
DECOMP P/U 230k Ibs
S/O 144k Ibs
ROT 177k Ibs
Torque 9k ft-Ibs @ 50 rpm
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-09
W-09
REENTER+COMPLETE
DOYON
DOYON 16
Date
From - To Hours Task Code NPT Phase
7/5/2004
23:00 - 23:30
0.50 FISH
p
23:30 - 00:00
0.50 FISH
DECOMP
P
7/6/2004
00:00 - 07:30
7.50 FISH
P
DECOMP
07:30 - 09:30 2.00 FISH P DECOMP
09:30 - 15:30 6.00 FISH P DECOMP
15:30 - 17:30 2.00 FISH P DECOMP
17:30 - 18:30 1.00 FISH P DECOMP
18:30 - 20:30 2.00 FISH P DECOMP
20:30 - 22:00 1.50 FISH P DECOMP
22:00 - 22:30 0.50 FISH P DECOMP
22:30 - 00:00 1.50 FISH P DECOMP
71712004 00:00 - 01 :30 1.50 FISH P DECOMP
01 :30 - 02:30 1.00 FISH P DECOMP
02:30 - 04:00 1.50 FISH P DECOMP
04:00 - 07:30 3.50 FISH P DECOMP
07:30 - 09:00
09:00 - 14:00'
1.50 FISH
5.00 FISH
P
P
DECOMP
DECOMP
14:00 - 16:00
16:00 - 17:30
2.00 FISH
1.50 FISH
DECOMP
DECOMP
P
P
Start: 7/2/2004
Rig Release: 8/18/2004
Rig Number:
Spud Date:
End:
Description of Operations
Wash down from 14191', engage fish at 14258. Continue
down, no-go after packer picker running 7' below the top of the
packer. Pick up to 250k to verify the grapples are below the
packer. Bottom of packer picker at 14274', mill at 14267'.
Mill packer from 14267'.
WOB = 5-10klbs
RPM = 90-100
Torque = 8-16k FtLb
6 bpm @ 1100 psi
P/U 230k S/0144k ROT 177k
- Continue milling packer from 14267' to 14270'.
- Utilizing pump rates from 0 - 8 bpm and rotary speeds from
90 - 150 rpm.
- Torque = 8-16k FtLb
- Monitor well - pump hi vis sweep & circulate hole clean.
- POH to BHA wI packer.
- Packer hanging up in casing collars.
- UD BHA & packer assy.
- R/U & test 95/8. casing to 3500 psi for 30 min..
- 12.5 bbls to pressure up casing.
- M/U 9 5/8" Fast Drill Bridge Plug & BHA.
- RIH wI Fast Drill to 2800'.
- Set Fast Drill wI 38 RH turns & shear wI 60K up wt.
- Ensure Fast Drill set wI 25K dn wt.
- Close pipe rams & test casing to 3500 psi for 5 min. 3.0 bbls
to pressure up casing. Open pipe rams.
- POH wI Fast Drill setting tool.
- POH wI bridge plug setting tool & rack back BHA.
- RIH wI 9 5/8" mechanical casing cutter to 2800' to displace
well to 9.5 ppg brine before making cut at -2200'.
- Displace SIW wI 9.5 brine in 9 5/8. x DP annulus @ 5 BPM
@ 870 psi.
- Attempt to locate collars wI 150 psi pump pressure wlo
success. Cut 9 5/8" casing @ 2200'.
- Close annular preventer & circulate 40 bbl soap sweep
followed by 9.5 brine & displace freeze protect from 133/8" x 9
5/8" annulus.
- POH & UD 9 5/8" casing cutter.
- Pull wear ring, NID BOP stack & tubing spool.
- Unable to remove bushing from tubing spool.
- Pulled primary packott from casing stub.
- Tack weld slips to casing.
- N/U new tubing spool & BOPE.
- MIU spear assy & latch 9 5/8" casing. Unseat 9 5/8" casing
slips w/45K overpull. Pull 9 5/8" casing to floor. Weld on
emergency slips did not hold, leaving slips in hole.
~CANNEr} NO\ll 8 20 ()!:.
Printed: 8/23/2004 9:23:01 AM
)
BP. Exploration
Operations Summary Report
Page 4-
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-09
W-09
REENTER+COMPLETE
DOYON
DOYON 16
Start: 7/2/2004
Rig Release: 8/18/2004
Rig Number:
Spud Date:
End:
Date From - To Hours Task Code NPT Phase Description of Operations
717/2004 16:00 - 17:30 1.50 FISH P DECOMP - Flow check showing well static.
17:30 - 19:30 2.00 FISH P DECOMP - Drain stack.
- Open top & bottom ram doors & retrieve slip body & all 4
segments.
100 % recovery.
19:30 - 20:00 0.50 FISH P DECOMP - PJSM - R/U casing handling equip't.
20:00 - 00:00 4.00 FISH P DECOMP - POH & UD 9 5/8" casing.
- Connections difficult to break - utilizing steam, hammers, & hi
torque casing tongs.
- Flow check & hole fill showing well static.
7/S/2004 00:00 - 05:00 5.00 FISH P DECOMP - POH & UD 9 5/8" casing.
- Recovered 55 jts, 33' partial jt, & 15 centralizers.
- Flow check & hole fill showing well static.
05:00 - 05:30 0.50 FISH P DECOMP - P/U jt. # 1 - B/O & UD spear assy.
05:30 - 07:00 1.50 FISH P DECOMP - Clean & clear rig floor of casing tools.
07:00 - 09:30 2.50 FISH P DECOMP - M/U 12 1/4" bit & 133/8" casing scraper & RIH. Tag 9 5/8"
casing stump @ 2200'.
09:30 - 10:00 0.50 FISH P DECOMP - CBU @ 10 BPM 670 psi.
10:00 - 12:30 2.50 FISH P DECOMP - Monitor well - pump dry job - POH & UD BHA.
12:30 - 14:00 1.50 FISH P DECOMP - M/U 133/8" Fast Drill Bridge Plug & RIH - set @ 2102'
- Attempt to test 133/8" casing. Pumped 2 bbl @ 340 psi &
leaked.
14:00 - 15:30 1.50 FISH P DECOMP - POH & UD setting tool.
- Clean floor.
15:30 - 18:00 2.50 FISH P DECOMP - M/U RTTS, RIH to 60', & break circ.
- Set RTTS @ 60' & test above to 800 psi - leaked. Test below
to 2000 psi & held.
- Pull up to 50' & set RTTS. Test below to 2000 psi & held.
- POH & UD RTTS.
18:00 - 20:00 2.00 FISH N DFAL DECOMP - M/U 13 3/S" cutting assy & RIH. Locate collar @ 69'.
- P/U to 50' & start cutting 13 3/8" casing. 90 RPM, TO 3K, &
various pump rates from 3 BPM - 4.5 BPM, 1250 psi - 2500
psi.
- No torque increase for 45 min - staedy @ 3K. Knives on
cutter not protruding enough to cut through casing.
20:00 - 21 :30 1.50 FISH P DECOMP - POH & remove stop from casing cutter to allow full extension
of knives.
- RIH & cut casing @ 50'. 85 RPM, TO 3K -7K, 3 BPM, 1170
psi.
21 :30 - 22:00 0.50 FISH P DECOMP - POH & UD cutting assy.
- Some cement on knives indicating cement behind 13 3/S"
casing.
22:00 - 00:00 2.00 FISH P DECOMP - PJSM - NID BOPE & tubing spool.
7/9/2004 00:00 - 00:30 0.50 FISH P DECOMP - N/D BOPE & tubing spool.
00:30 - 01 :30 1.00 FISH P DECOMP RIH w/13 318" spear assy & attempt to pull & jar casing free
wlo success. Made 5 attempts to jar free - P/U wt up to 375K.
01 :30 - 02:00 0.50 FISH P DECOMP POH & UD spear.
02:00 - 03:30 1.50 FISH P DECOMP M/U cutting assy & swap pistons to allow cutting operations w/o
circulating. RIH to l' below 13 318" mandrel hanger. Make cut
wI 70 RPM, TO 5K - 15K, 1050 psi wi no flow.
03:30 - 05:30 2.00 FISH P DECOMP Attempt to P/U fish wi 30K overpull wlo success. POH & UD
cutting assy. MlU spear & engage fish & pull free wI 200K.
SCANNE[) NO\ 1.
l.U U{}
Printed: 8/2312004 9:23:01 AM
')
')
BP
Operations Summary Report
Page 5 ...
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-09
W-09
REENTER+COMPLETE
DOYON
DOYON 16
Start: 7/2/2004
Rig Release: 8/18/2004
Rig Number:
Spud Date:
End:
Ðãtè From- To Hours Task Code NPT Phase Description of Operations
7/9/2004 03:30 - 05:30 2.00 FISH P DECOMP Disengage spear & UD fish in cellar. POH & UD spear assy.
Pin hole found 4" below mandrel hanger in 13 3/8" pup jt.
05:30 - 08:30 3.00 FISH P DECOMP P/U & M/U 16" wash pipe & handling equip't.
08:30 - 11 :00 2.50 FISH P DECOMP Wash over 13 3/8" casing wi 16" wash pipe to 61' RKB. Firm
cement - wash over @ 2.7 BPM, 70 psi POH wi wash pipe.
11 :00 - 12:00 1.00 FISH P DECOMP Cut eye holes in 13 3/8" casing stub. Pull & UD 19.43' casing
stub.
12:00 - 14:00 2.00 FISH N RREP DECOMP Repair blower motor shroud on TO.
14:00 - 15:00 1.00 FISH P DECOMP M/U jt of DP on top of wash pipe & wash from 61' to 80'. No
cement.
15:00 - 17:00 2.00 FISH P DECOMP POH wI wash pipe & break connections. Connections tight.
17:00 - 18:00 1.00 FISH P DECOMP Clean & clear floor of 16" wash pipe tools & equip't.
18:00 - 20:00 2.00 FISH P DECOMP RIU Schlumberger E-line & RIH w/8 strand string shot. Locate
collar @ 69' & fire string shot. RID Schlumberger & keep on
location until back off complete.
20:00 - 23:00 3.00 FISH P DECOMP P/U 133/8" back off assy & RIH. Set bottom anchor wI 1500
psi pump pressure. Pressure up to 2000 psi & ensure top
anhor set. Bottom of top anchor set @ 60'. Back off 133/8"
casing wI 1200 psi. Back out a full 5 revolutions. Release
Schlumberger once back off confirmed.
23:00 - 00:00 1.00 FISH P DECOMP POH & UD back off assy.
7/10/2004 00:00 - 01 :00 1.00 FISH P DECOMP Continue POH & UD back off assy & stand back DC's.
01 :00 - 02:30 1.50 FISH P DECOMP M/U & RIH w/13 3/8" spear assy. Engage spear into 133/8"
casing stub & back out 6 revolutions wI neutral wt. POH wI
18.24' casing stub.
02:30 - 07:00 4.50 FISH P DECOMP RIU to run 133/8" casing. Cut off old 20" landing ring & weld
on new 20" landing ring. Clean & prep new wellhead equip't.
07:00 - 08:00 1.00 FISH P DECOMP P/U spear & 13 3/8" casing stub & break out. UD same.
08:00 - 09:30 1.50 CASE P DECOMP RIH wI screw in sub, 19.83' 13 3/8" L-80 68# pup jt, & one
37.65' L-80 68# 133/8" it on jt of 4" DP. Tag collar & screw
into 133/8" wI 12.5K ftllbs tq. P/U 200K to ensure M/U.
09:30 - 10:00 0.50 CASE P DECOMP Pressure test 13 3/8" casing - test failed - communication
between 20" & 13 3/8".
10:00 - 11 :00 1.00 CASE P DECOMP Back off the top jt. of 13 3/8" casing & UD same.
11 :00 - 12:00 1.00 CASE P DECOMP Clear & clean floor - mobilize HOWCO for RTTS.
12:00 - 12:30 0.50 CASE P DECOMP Lubricate rig - Service TO & blocks.
12:30 - 14:30 2.00 CASE P DECOMP MIU & RIH w/13 3/8" RTTS & set @ 72'. Test 133/8" casing
below to 1500 psi - OK POH & UD RTTS.
14:30 - 17:00 2.50 FISH P DECOMP P/U 133/8" spear & RIH. Engage pup jt & screw in sub & B/O
wI neutral wt & LH rotation. POH & UD pup jt & screw in sub.
Found bow spring centralizer bands jammed inside screw in
sub between pin end of pup jt & wall of screw in sub.
17:00 - 17:30 0.50 FISH P DECOMP RIH w/11" magnet to 75' & POH. No metal found on magnet.
17:30 - 19:00 1.50 FISH P DECOMP RIH w/12 1/4" bit to 75' & circulate 5 BPM for 1 minute to clean
up threads on casing collar. POH & UD bit.
19:00 - 19:30 0.50 CASE P DECOMP RIU to run 13 318. casing.
19:30 - 21 :30 2.00 CASE P DECOMP RIH wI screw in sub, 21.53' L-80 68# 13318. pup jt, & 37.65'
L-80 68# jt 133/8" casing. Tag collar @ 69' & screw into 13
318. w/12.5K ftI1bs tq. P/U 150K to ensure MIU. Pressure test
13 318. casing to 2500 psi for 10 minutes - good test.
21 :30 - 22:00 ! 0.50 CASE P DECOMP RIU to cement 13 3/8. casing by running two jts 1. inside 20" x
13318. annulus. Tag up on cement 65' from ground level w/1".
RIU cementers.
5CANNED; NO\J ], 8 2.004
Printed: 8/2312004 9:23:01 AM
')
')
1B~\Ii)<(Dloration
Operations Summary Report
Page 6 488Þ
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-09
W-09
REENTER+COMPLETE
DOYON
DOYON 16
Start: 7/2/2004
Rig Release: 8/18/2004
Rig Number:
Spud Date:
End:
Date From - To Hours Task Code NPT Phase Description of Operations
7/10/2004 22:00 - 23:30 1.50 REMCM-P DECOMP PJSM - Test lines to 500 psi & pump 11 bbls. 15.7 ppg Arctic
Set I cement.
23:30 - 00:00 0.50 CASE P DECOMP Suck out cellar & clean out landing ring. Center up 13 3/8" to
set 13 3/8" emergency slips.
7/11/2004 00:00 - 00:30 0.50 CASE P DECOMP P/U 13 3/8" 100K over & set emergency slips. S/O casing.
00:30 - 04:30 4.00 DECOMP Cut 133/8" casing & UD. Weld on transition nipple - pre-heat
wI hot head & wrap wI insulation. UD casing tools. General
housekeeping on rig.
04:30 - 12:30 8.00 WHSUR P DECOMP Allow transition nipple to cool down wI hot head.
Notes:
While waiting on transition nipple to cool rig crew performed
the following: Full inspection & maintenance of TO. Plumbing
in new # 1 boiler. Plumb lines for chemical shack. Load &
prep 9 5/8" casing.
12:30 - 14:00 1.50 WHSUR P DECOMP Test weld on transition nipple wI nitrogen - failed. Weld @ leak
& retest to 1340 psi - good test.
14:00 - 15:30 1.50 WHSUR P DECOMP Install FMC starting head & tubing spool & pressure test metal
to metal seal to 1000 psi - good test.
15:30 - 20:30 5.00 BOPSUP P DECOMP N/U BOPE.
20:30 - 21 :30 1.00 BOPSUP P DECOMP RlU test equip't & install test plug. Body test BOPE to 250 psi I
3500 psi. Pull test plug.
21 :30 - 22:30 1.00 CASE P DECOMP Close blind rams & test 13 3/8" casing to 2500 psi for 30 min -
good test - bleed off pressure & open blind rams.
22:30 - 23:00 0.50 WHSUR P DECOMP Install wear bushing.
23:00 - 00:00 1.00 FISH P DECOMP M/U 12 1/4" BHA for drilling 133/8" Fast Drill Bridge Plug.
7/12/2004 00:00 - 01 :30 1.50 FISH P DECOMP RIH to 2052' w/12 1/4" drilling assy.
01 :30 - 03:30 2.00 FISH P DECOMP M/U std. 4" DP pipe to TO. Off bottom parameters - S/O wt
84K, up wt 84K, Rot wt 84K, 2.5K Tq. Pump rate - 5 BPM 180
psi. Wash down & tag bridge plug @ 2111 '. Drill bridge plug
wI 25 - 35K wt on bit, 80 - 90 RPM, 3 - 9K Tq, 5 BPM 180 psi.
Chase bridge plug to top of 95/8" casing stub @ 2200' &
resume drilling.
03:30 - 05:00 1.50 FISH P DECOMP POH w/12 1/4" drilling assy.
05:00 - 07:00 2.00 FISH P DECOMP C/O 12 1/4" bit for 81/2" bit & RIH to 2200'.
07:00 - 07:30 0.50 FISH P DECOMP Attempt to enter 9 5/8" stub wI various rotary speeds wI 8 1/2"
bit wlo success.
07:30 - 09:30 2.00 FISH P DECOMP POH - UD bit & boot baskets. Clean boot baskets - small
amounts of CBP.
09:30 - 11 :00 1.50 FISH P DECOMP Clear floor - P/U bullnose & 8 1/2" tapered string mill & RIH to
2200'.
11 :00 - 13:30 2.50 FISH P DECOMP Engage remnants of 13 318" CBP inside 9 5/8" casing stub @
2003'. Attempt to work through wI various rotary speeds wlo
success.
13:30 - 14:30 1.00 FISH P DECOMP POH.
14:30 - 15:00 0.50 FISH P DECOMP UD bullnose & string mill - inspect same - P/U 63/4" junk mill.
15:00 - 16:30 1.50 FISH P DECOMP RIH w/6 314" junk mill. Mill on CBP remnants for 1 1/2 minutes
& CBP fell. Chase CBP remnants to 2710'.
16:30 - 17:30 1.00 FISH P DECOMP POH w/6 314" mill.
17:30 - 18:00 0.50 FISH P DECOMP UD mill assy & clear floor.
18:00 - 19:00 1.00 FISH P DECOMP PJSM - RlU Sclumberger E-line.
19:00 - 20:00 1.00 FISH P DECOMP RIH wI E-line & locate 9 5/8" collar on first full jt below stub @
2242'. Fire 8 strand string shot @ 2242'. POH & RID
~CANNErl NO\! 1 8 200Li
Printed: 8/23/2004 9:23:01 AM
)
')
BP Exploration
Operations Summary Report
?a.9~7-
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-09
W-09
REENTER+COMPLETE
DOYON
DOYON 16
Start: 7/2/2004
Rig Release: 8/18/2004
Rig Number:
Spud Date:
End:
Date From - To Hours Task Code NPT Phase Description of Operations
7/12/2004 19:00 - 20:00 1.00 FISH P DECOMP Schlumberger.
20:00 - 21 :00 I 1.00 CASE P DECOMP Close blind rams & perform injectivity test through kill line.
Pump @ 1 BPM for 4 bbls - pressure broke over @ 1120 psi.
& decreased to 750 psi. Increase pump rate to 3 BPM 820 psi
& pumped additional 16 bbls. Bled off 1 bbl back to trip tank.
21 :00 - 23:00 2.00 FISH P DECOMP P/U & M/U 9 5/8" back off BHA.
23:00 - 00:00 1.00 FISH P DECOMP RIH w/9 5/8" back off assy to 1796'
7/13/2004 00:00 - 01 :30 1.50 FISH P DECOMP RIH w/9 5/8" back off assy & set bottom anchor wI 1200 psi &
S/O. Confirm bottom anchor set. Increase pressure to 2500 psi
& S/O to neutral wt & confirm top anchor set. Bleed off
pressure. Pressure up on drill string & back off 9 5/8" casing
@ 2242'. Casing backed out wI 1650 psi. Bleed off pressure.
Continue to cycle pump until casing backed out a full 5
revolutions.
01 :30 - 02:00 0.50 FISH P DECOMP Drop ball & shear open pump out sub wI 2000 psi. Pump dry
job
02:00 - 03:00 1.00 FISH P DECOMP POH to BHA.
03:00 - 05:00 2.00 FISH P DECOMP UD DC's, back off tool, & rack back 3 stands of DC's.
05:00 - 07:00 2.00 FISH P DECOMP Clear rig floor & P/U 95/8" spear assy. CIO grapple & M/U
spear assy.
07:00 - 08:00 1.00 FISH P DECOMP Cut & slip 98' of drilling line. Lubricate rig.
08:00 - 09:00 1.00 FISH P DECOMP RIH to 2200' & engage fish wI spear. Complete back off wI
neutral wt.
09:00 - 11 :30 2.50 FISH P DECOMP POH & UD fish & spear assy' Recovered 1 full jt of 9 5/8"
casing & 4.80' 9 5/8" stub wI turbolator.
11 :30 - 12:00 0.50 CASE P DECOMP RIU casing tools for running 9 5/8" casing.
12:00 - 12:30 0.50 WHSUR P DECOMP Pull wear ring
12:30 - 17:00 4.50 CASE P DECOMP PJSM for running casing. Run a total of 55 jts 9 5/8" casing -
21 jts 47# L-80 BTC-Mod on bottom & 34 jts 40# L-80 BTC on
top. M/U 9 5/8" 9K ft/lbs torque.
17:00 - 17:30 0.50 CASE P DECOMP M/U x-overs & 5' DP pup & M/U to TO.
17:30 - 18:00 0.50 CASE P DECOMP Tag 9 5/8" casing stump & screw into w/9 5/8" casing. M/U wI
9K ft/lbs tq. S/O wt 117K. Pull test to 50K over-okay.
Pressure test 9 5/8" casing to 3500 psi for 10 min. - good test.
18:00 - 20:00 2.00 CASE P DECOMP PJSM - Pump out stack & disconnect flowline. Break out BOP
stack below tubing spool. P/U stack & secure wI bridge
cranes.
20:00 - 22:00 2.00 CASE P DECOMP P/U 80K & set 9 5/8" emergency slips.
22:00 - 23:30 1.50 CASE P DECOMP Cut 9 5/8B casing wI mechanical cutter & dress up stub.
23:30 - 00:00 0.50 CASE P DECOMP UD cut off 9 5/8" stub.
7/14/2004 00:00 - 02:00 2.00 WHSUR P DECOMP MIU 9 5/8B packoff & running tool on test jt & RIH. Packoff
hanging up - pull packoff. Obstruction in lower pipe ram cavity.
Partially close lower rams & allow ram to push out metal. Run
through stack wI tee bar on tugger & knock metal free.
Recovered 9 5/8B turbolator. RIH w/9 5/8B packoff & running
tool on test jt & set packoff.
02:00 - 04:30 2.50 WHSUR P DECOMP N/U BOP stack, flowline, & tumbuckles. Test 9 5/8B packoff to
2400 psi - good test. P/U & B/O x-overs from 95/8" cut off jt.
UD same. Install test plug.
04:30 - 05:00 0.50 WHSUR P DECOMP Body test BOP stack to 250 psi I 3500 psi.
05:00 - 06:00 I 1.00 WHSUR P DECOMP Pull test plug & install wear ring. RIU to test casing
06:00 - 06:30 0.50 CASE P DECOMP Pressure test 9 5/8B casing to 3500 psi for 30 min & chart -
good test.
~CANNED NOV 1 8 2004
Printed: 8/2312004 9:23:01 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
7/14/2004
7/15/2004
7/16/2004
^)
')
Page 8-
.~~...E~pòra.ti()r1
Operations SUmmary Report
W-09
W-09
REENTER+COMPLETE
DOYON
DOYON 16
06:30 - 07:30
From - To Hours Task Code NPT Phase
DECOMP
07:30 - 08:00
08:00 - 10:00
10:00 - 14:30
14:30 - 15:00
15:00 - 20:00
20:00 - 21 :00
21 :00 - 23:00
23:00 - 00:00
00:00 - 05:30
05:30 - 06:30
06:30 - 07:30
07:30 - 08:30
08:30 - 09:00
09:00 - 09:30
09:30 - 15:00
15:00 - 22:00
22:00 - 22:30
22:30 - 00:00
00:00 - 01 :30
01 :30 - 02:30
02:30 - 07:30
1.00 CLEAN P
0.50 CLEAN P
2.00 CLEAN P
4.50 CLEAN P
0.50 CLEAN P
5.00 CLEAN P
1.00 CLEAN P
2.00 CLEAN P
1.00 CLEAN P
5.50 CLEAN P
1.00 CLEAN P
1.00 CLEAN P
1.00 CLEAN P
0.50 CLEAN P
0.50 CLEAN P
5.50 CLEAN P
7.00 CLEAN P
0.50 CLEAN P
1.50 CLEAN P
1.50 CLEAN P
1.00 CLEAN P
5.00 CLEAN P
DECOMP
DECaMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
Start: 7/2/2004
Rig Release: 8/18/2004
Rig Number:
Spud Date:
End:
Description of Operations
P/U jars & bumper sub, break out spear assy & UD spear. P/U
junk baskets & M/U 8 1/2" bit.
Lubricate rig.
RIH to 2718' & tag junk. M/U TD - wash & push junk from
2713' to 2791'. Off bottom parameters - 7 BPM 550 psi, P/U wt
88K, SIO wt 80K, ROT wt 80K, 80 RPM 3.5K ft/lbs. Tq.
Note:
Freeze protect 13 3/8" x 9 5/8" OA wI Uttlle Red Services out
of critical path.
PJSM - Test lines to 2500 psi - pump 141 bbls 9.3 ppg # 4
diesel @ 3 BPM, 900 psi. 500 psi on OA once job complete.
Drill junk & CBP from 2791' to 2797' wI 5K to 15K on bit, 100
RPM, Tq 5K, pump rate 8 BPM 580 psi. Plug fell down hole
while drilling @ 2797'.
Pump 20 bbl hi -vis sweep & circ surface to surface @ 9.5
BPM 820 psi. Sweep brought back small amounts of CBP
rubber.
Continue RIH w/8 1/2" drilling assy on 4" DP to 14343'.
M/U TD & wash from 14343' & tag junk I CBP @ 14352'.3
BPM 260 psi. Off bottom parameters wI pump - 5 BPM 730
psi, P/U wt 250K, S/O wt 135K, ROT wt 175K wI 60 RPM 10 K
ft/lbs T q. Drill junk I plug from 14352' to 14353.5' wI 5K to 10K
wt on bit, 80 RPM, 10K to 14K ft/lbs Tq, pump rate 4.8 BPM
530 psi. Stalled top drive wI 20K @ 14353.5'. P/U off bottom &
slowly rotated back down & stalled out again @ 14353.5'.
Estimated 5 1/2" liner top.
Pump 40 bbl hi-vis sweep & circ surface to surface @ 9.5 BPM
2660 psi. Rotate @ 110 RPM & reciprocate.
Pump dry job & BID TD. POH from 14353' to 13236'.
POH from 13236' to BHA w/8 1/2" drilling assy.
B/O & UD 61/4" DC's.
B/O & UD BHA. Empty junk baskets - 2 Ibs. of metal & rubber.
Clear floor of tools. R/U to to run 4 3/4" x 3 1/2" BHA.
Lubricate rig & inspect TD.
PJSM - M/U slim hole tools.
P/U & M/U BHA Shallow test MWD.
RIH w/4 3/4" milling assy from 581' to 14287' filling every 30
stands. Float sub in string for MWD collar.
M/U TD & screw into stand 144. Off bottom parameters wI
pump - 3.5 BPM 1300 psi, P/U wt 210K, S/O wt 142K, ROT wt
172K wI 9K ft/Ibs. Tq. Wash down & tag junk I plug @ 14351'.
Mill on junk I plug from 14351' to 14355' wI 1K to 5K wt on mill,
3.5 BPM 1260 psi, 60-70 RPM, 9K -11K ft/Ibs. Tq.
Continue milling on junk from 14355' to 14362' wI 2K-5K wt on
mill. 3.5 BPM 1460 psi, 60 - 70 RPM, 9K - 11.5K ftIIbs Tq.
Junk I plug fell @ 14362'. Work through TaL x 5 to ensure
clear of junk.
Wash down from 14362' to 14576' @ 3.5 BPM 1510 psi.
M/U singles & tag junk @ 14605'. Milling on junk from 14605'
to 14612' wI 1K - 15K wt on mill, 1 BPM 800 psi, 2 BPM 1000
psi, 3.5 BPM 1450 psi, 60 - 80 RPM 9.5K - 11.5K ft/lbs. Tq. No
progress made last 1.5 hrs. milling.
SCANNED NOV .1 8 2004
Printed: 8/2312004 9:23:01 AM
)
)
BP Exploration
Operations Summary Report
Þ~ge9~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-09
W-09
REENTER+COMPLETE
DOYON
DOYON 16
Start: 7/2/2004
Rig Release: 8/18/2004
Rig Number:
Spud Date:
End:
Date From - To Hours Task Code NPT Phase Description of Operations
7/16/2004 07:30 - 08:00 0.50 CLEAN P DECOMP P/U drill string & increase pump rate to 3.5 BPM 1150 psi. Lost
300 psi pump pressure. Tq. decreased to 8.5K ft/lbs. Lost
MWD signal - cycle pump in attempt to regain signal wlo
success. Possible twist off or washout.
08:00 - 15:00 7.00 CLEAN P DECOMP POH looking for washout.
15:00 - 18:00 3.00 CLEAN P DECOMP UD BHA including 3 1/2" DC's. Could not break connection on
MWD hang off collar. Attempted to B/O wI 6000 ft/lbs Tq. UD
collar & sent to Sperry Sun for B/O. Recovered 100% BHA &
no drill string washout. Junk mill completely worn - pressure
loss possibly due to worn mill & bad MWD.
18:00 - 19:00 1.00 CLEAN P DECOMP Clear & clean rig floor.
19:00 - 22:00 3.00 CLEAN P DECOMP M/U BHA wI new 43/4" junk mill.
22:00 - 00:00 2.00 CLEAN P DECOMP RIH w/4 3/4" milling assy to 5255'.
7/17/2004 00:00 - 05:00 5.00 CLEAN P DECOMP Continue RIH w/4 3/4" milling assy filling every 35 stands from
5255' to 14265'. Off bottom parameters @ 14265' - 4 BPM
1060 psi, P/U wt 200K, S/O wt 140K, ROT wt 168K @ 50 RPM,
7.5K ft/lbs Tq.
05:00 - 06:00 1.00 CLEAN P DECOMP Wash down from 14265' to 14612' @ 5 BPM 1600 psi. Tagged
junk @ 14612'.
06:00 - 08:30 2.50 CLEAN P DECOMP Mill junk from 14612' to 14619' wI 2 - 5K on mill, 60 - 75 RPM,
7.5K - 9K ft/lbs Tq, 5 BPM 1690 psi.
08:30 - 10:00 1.50 CLEAN P DECOMP Wash & push junk from 14619' to 14720' @ 5 BPM 1600 psi.
10:00 - 12:30 2.50 CLEAN P DECOMP Mill junk from 14720' to 14725' @ 5 BPM 1600 psi, 6K - 8K wt
on mill, 80 RPM 1 OK ft/lbs Tq,
12:30 - 13:00 0.50 CLEAN P DECOMP Dress off top of cement @ 14725' w/5 BPM 1600 psi, 5K - 10K
wt on mill, 100 RPM, 9K ft/lbs. TQ Set 30K down on plug x 3 to
ensure solid bottom for whipstock.
13:00 - 14:00 1.00 CLEAN P DECOMP CBU @ 7 BPM 2100 psi. Cement cuttings on B/U.
14:00 - 17:00 3.00 CLEAN P DECOMP Clean out pits for taking on mud.
17:00 - 18:30 1.50 CLEAN P DECOMP Fill pits wI 8.4 ppg flo-pro mud.
18:30-21:30 3.00 CLEAN P DECOMP PJSM wI Drilling Sup'v, Tool Pusher, Mud Engineer, Rig
Crews, & Truck Drivers for displacement. Pump 40 bbl hi-vis
sweep followed by 180 bbls flo-pro mud @ 7.5 BPM 3400 psi,
rotating @ 80 RPM's & reciprocating. Shut down pump & drop
opening dart for circ sub - pump dart down @ 2 - 2.6 BPM, 700
- 850 psi. Circ sub opened wI 1800 psi after pumping 60 bbls.
Increase pump rate to 15 - 18 BPM, 2700 - 3150 psi, 80 RPM's
& reciprocating.
21 :30 - 23:00 1.50 CLEAN P DECOMP CBU @ 15 BPM 2770 psi, 80 RPM & reciprocating.
23:00 - 00:00 1.00 CLEAN P DECOMP Pump dry job - BID TO & POH wet
7/18/2004 00:00 - 00:30 0.50 CLEAN P DECOMP Service TO & lubricate rig.
00:30 - 01 :00 0.50 CLEAN P DECOMP POH wet.
01 :00 - 02:00 1.00 CLEAN P DECOMP Pump dry job - monitor well - BID TO
02:00 - 09:00 7.00 CLEAN P DECOMP POH wI 4 3/4. milling assy to BHA.
09:00 - 13:00 4.00 CLEAN P DECOMP BfO & UD 4 3/4. BHA. Clean out junk baskets - recovered 1
gal. of small metal pes & pes of CBP.
13:00 - 14:00 1.00 CLEAN P DECOMP Clear tools & clean rig floor.
14:00 - 15:00 1.00 CLEAN P DECOMP RlU test equip't for testing BOPE. Pull wear ring - install test
plug & test jt.
15:00 - 20:00 5.00 BOPSUR P DECOMP Pressure test BOPE to BP & AOGCC Regs. 3500 psi H I 250
psi L for 5 min. Test witnessed by AOGCC Rep John Crisp.
20:00 - 20:30 0.50 BOPSUR P DECOMP RID test equip't - pull test plug - install wear ring.
20:30 - 21:00 0.50 DECOMP Lubricate rig & service TO.
SCANNED NOV 1 8 2004
Printed: 8/2312004 9:23:01 AM
)
)
BP Exploration
Operations Summary Report
Page 108
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-09
W-09
REENTER+COMPLETE
DOYON
DOYON 16
Start: 7/2/2004
Rig Release: 8/18/2004
Rig Number:
Spud Date:
End:
Date From - To Hours Task Code NPT Phase Description of Operations
7/18/2004 21 :00 - 22:30 1.50 BOPSUP P DECOMP Install modified flow nipple.
22:30 - 00:00 1.50 CASE P DECOMP R/U test equip't to test casing. Pressure test 9 5/8" casing x 5
1/2" liner to 3500 psi for 30 min. - good test.
7/19/2004 00:00 - 00:30 0.50 EVAL P DECOMP PJSM wI Schlumberger & rig crew. RlU sheaves & E-line
00:30 - 04:30 4.00 EV AL P DECOMP Run GR & CCL on E-line wI 4.5" gauge ring & junk basket.
Hung up @ TOL & worked through. Could not get past 14610'.
Made several attempts wlo success. POH & clean out junk
basket. 2 pes rubber & 1 pc of metal. Largest pc of rubber
measuring 6" x 2". All pes appear to be from CBP.
04:30 - 07:30 3.00 EVAL P DECOMP RIH wi GR & CCL on E-line wI 4.5" gauge ring & junk basket.
Went through TOL wI no problem, but could not get past
14610'. Made several attempts to work through 14610' wlo
success. Logged up through TOl. POH
07:30 - 11 :00 3.50 EV AL P DECOMP Remove gauge ring & junk basket. RIH wI GR & CCl. Tagged
up @ 14609' & worked through to 14725' Logged up to 14100'
wI GR & CCl.
11 :00 - 15:00 4.00 EVAL P DECOMP M/U new CCL, gauge ring, & junk basket w/o GR RIH to
14610' & tagged up. Attempt to work through for 1.5 hrs. w/o
success. POH wI E-line. RID E-line.
15:00 - 18:30 3.50 CLEAN P DECOMP P/U & M/U 4 3/4. string mill BHA.
18:30 - 19:30 1.00 CLEAN P DECOMP Slip & cut 114' drilling line.
19:30 - 00:00 4.50 CLEAN P DECOMP RIH to 9673' filling every 30 stands.
7/20/2004 00:00 - 02:30 2.50 CLEAN P DECOMP Continue RIH w/4 3/4" string mill to 14301', filling pipe every
30 stands.
02:30 - 03:30 1.00 CLEAN P DECOMP M/U TO and establish off bottom parameters:
P/U 205K
S/O 140K
ROT 175K
Torque 8.5k ftllbs
2 bpm @ 700 psi.
03:30 - 04:00 0.50 CLEAN P DECOMP RIH & tag up at 14611'. P/U and attempt to break circulation,
drill string plugged off, pressured up string to 2500 psi. Attempt
to unplug by pressuring up, bleeding off, & moving string wlo
success.
04:00 - 09:00 5.00 CLEAN P DECOMP Mill from 14611' to 14622' with no pump.
WOM 2 - 7 klbs
80 - 100 RPM
Torque 9k ftIIbs
Fell through obstruction with the string mill at 14619'. Reamed
through from 14600' to 14640' 5 times. PU to 14600' and RIH
to 14640' without rotating 5 additional times.
09:00 - 09:30 0.50 CLEAN P DECOMP RIH to TO @ 14725'. Set down at 14725' 2 times with 20k.
09:30 - 10:00 0.50 CLEAN P DECOMP POH to 14330 and work through liner top 2 times. RIH to TO at
14725' w/o problems.
10:00 - 11 :00 1.00 CLEAN P DECOMP POH from 14725' to 14330'
11 :00 - 11 :30 0.50 CLEAN P DECOMP Drop dart and attempt to open circ sub wlo success.
11 :30 - 12:30 1.00 CLEAN P DECOMP POH with wet 4. DP.
12:30 - 13:00 0.50 CLEAN P DECOMP Service top drive, lube rig.
13:00 - 18:30 5.50 CLEAN P DECOMP Continue POH with wet 4. DP.
18:30 - 20:30 2.00 CLEAN P DECOMP LD BHA #21, mill assembly
20:30 - 21 :00 0.50 CLEAN P DECOMP Clean and clear rig floor.
21 :00 - 21 :30 0.50 CLEAN P DECOMP PJSM with Schlumberger and rig personnel on rigging up and
Printed: 8/2312004 9:23:01 AM
. - . NNE~' NO\! .~ to Olj
SÇA ;, . ",,~b.;: ; ...
)
)
BID Exploration
Operations Summary Report
1jiø.~~11' -
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-09
W-09
REENTER+COMPLETE
DOYON
DOYON 16
Start: 7/2/2004
Rig Release: 8/18/2004
Rig Number:
Spud Date:
End:
Date From - To Hours Task Code NPT Phase Description of Operations
7/20/2004 21 :00 - 21 :30 0.50 CLEAN P DECOMP running slick line.
21 :30 - 22:00 0.50 CLEAN P DECOMP RU slick line to run junk basket gauge ring.
22:00 - 00:00 2.00 CLEAN P DECOMP Run 4.75" gauge ring and junk basket on slick line.
7/21/2004 00:00 - 00:30 0.50 CLEAN P DECOMP RIH with 4.75" gauge ring and junk basket, unable to get below
tight spot at 14611'. POH, 1 cup rubber and fiberglass from
composite bridge plugs recovered from junk basket.
00:30 - 03:00 2.50 CLEAN P DECOMP MU up additional weight bar above junk basket. RIH with 4.75"
gauge ring and junk basket for attempt #2. Still unable to get
below tight spot at 14611'. POH, 1 cup rubber and fiberglass
recovered from junk basket.
03:00 - 05:00 2.00 CLEAN P DECOMP MU junk basket with 4.66" gauge ring and a roller stem. RIH to
TD @ 14724' SLM. PU and work through 14600' to 14724' 6
times.
05:00 - 06:00 1.00 CLEAN P DECOMP POH with slick line. Recovered 2 cups metal shavings and
small pieces of metal from junk basket.
06:00 - 08:00 2.00 CLEAN P DECOMP RIH with 4.66" gauge ring and junk basket, work through from
14600' to 14724' SLM.
08:00 - 09:00 1.00 CLEAN P DECOMP POH with gauge ring and junk basket. Recovered 2 cups
paraffin, metal shavings and pieces of composite bridge plugs.
09:00 - 11 :00 2.00 CLEAN P DECOMP RIH with 4.66" gauge ring and junk basket, work through from
14600' to 14724' SLM 6 times.
11 :00 - 12:00 1.00 CLEAN P DECOMP POH with gauge ring and junk basket. Recovered a few small
pieces of composite bridge plugs and 2 small metal cuttings.
12:00 - 12:30 0.50 CLEAN P DECOMP RD Schlumberger slickline.
12:30 - 13:00 0.50 STWHIP P WEXIT PJSM with BOT, Sperry and all rig personnel on picking up and
running whipstock and MWD tools.
13:00 - 17:30 4.50 STWHIP P WEXIT PU and MU BHA #22, whip stock and mill assembly. Shallow
test MWD tools
17:30 - 00:00 6.50 STWHIP P WEXIT RIH with whipstock, limit running speed to 1-1/2 to 2 minutes
per stand. Fill DP, circulate a DP volume and check MWD tools
every 30 stands.
Midnight depth: 8369'
7/22/2004 00:00 - 05:30 5.50 STWHIP P WEXIT RIH to 14320' with whipstock and milling assembly, limiting
running speed to 1-1/2 to 2 minutes per stand. Fill DP, circulate
a DP volume and check MWD tools every 30 stands.
05:30 - 08:00 2.50 STWHIP P WEXIT Wash down from 14320'to 14705' with whipstock and milling
assembly.
P/U 195k S/O 140k
4 bpm @ 1540 psi
08:00 - 08:30 0.50 STWHIP P WEXIT Orient whipstock face to 40L. RIH and set down at 14725'. Set
trip anchor with 25k down weight. Pull up 10k over string weight
to verify anchor set. Set down 30k to shear mills free.
TOW - 14636'
BOW - 14648'
08:30 - 18:00 9.50 STWHIP P WEXIT Mill window from 14636' to 14639'.
WOM = 3-5 klbs
RPM = 50
Torque off Btm = 8.5k FtLb, Torque on Btm = 9.5k FtLb
BPM = 4 @ 1430 psi on Btm,
Printed: 8/23/2004 9:23:01 AM
SCANNEt:.) NO\ll
2.0 Of)
)
)
Page1248a
BP Exploration
O~g~,~i(!)RS .Summary .Rep.ørt
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-09
W-09
REENTER+COMPLETE
DOYON
DOYON 16
Start: 7/2/2004
Rig Release: 8/18/2004
Rig Number:
Spud Date:
End:
Date From - To Hours Task Code NPT Phase Description of Operations
7/22/2004 08:30 - 18:00 9.50 STWHIP P WEXIT P/U 195k S/O 140k ROT 168k
By 1300 hrs made 3'. Started varying parameters in an attempt
to increase penetration rate.
WOM 10-12 klbs
RPM = 100
Torque = 9.5k FtLb
BPM = 3 @ 1100 psi
WOM 15-25 klbs
RPM = 140
Torque = 7.5k FtLbs
BPM = 0
Still unable to make any footage, conferred with town drilling
staff and the decision was made to POH with the milling
assembly.
18:00 - 19:30 1.50 STWHIP N DFAL WEXIT POH to 5' above top of whipstock. Drop dart to open circ sub.
CBU, 13 BPM @ 2800 psi
19:30 - 00:00 4.50 STWHIP N DFAL WEXIT POH with milling assembly.
Midnight depth: 6976'
7/23/2004 00:00 - 03:00 3.00 STWHIP N DFAL WEXIT Continue POH with milling assembly.
03:00 - 03:30 0.50 STWHIP N DFAL WEXIT PJSM with BOT, Sperry and all rig personnel on laying down
BHA #22, milling assembly.
03:30 - 05:00 1.50 STWHIP N DFAL WEXIT Change out tongs and elevators. LD BHA #22. Clean and clear
rig floor.
2-7/8" PAC X 2-3/8" IF crossover parted at the pin leaving both
mills in the hole, total length 5.77'.
Top of fish @ 14633.2'
05:00 - 06:00 1.00 STWHIP N DFAL WEXIT Clear and clean rig floor.
06:00 - 06:30 0.50 FISH N DFAL WEXIT PJSM with BOT and all rig personnel on making up fishing
BHA.
06:30 - 07:00 0.50 FISH N DFAL WEXIT Bring fishing BHA to rig floor.
07:00 - 09:30 2.50 FISH N DFAL WEXIT MU BHA #23, fishing assembly a 4-11/16" overshot with 3-1/8"
grapple
09:30 - 10:00 0.50 FISH N DFAL WEXIT Rig service.
10:00 - 16:00 6.00 FISH N DFAL WEXIT RIH to 14309' with overshot assembly on 4" DP. Fill DP and
break circulation every 35 stands.
16:00 - 17:00 1.00 FISH N DFAL WEXIT MU top drive and wash down from 14309' to 14630'.
P/U 195k S/O 138k
2 bpm @ 600 psi
17:00 - 17:30 0.50 FISH N DFAL WEXIT RIH to 14633'. Stack 15k on fish with 100 psi increase in pump
pressure. PU with 30k overpull, fish engaged.
Work drillstring from 120k to 250k
6 bpm @ 1500 psi.
Start jarring at 225k, PU 40K ove, continue increasing jar
5CI\NNEJ} NO\J 1
If\ It{
Printed: 8/23/2004 9:23:01 AM
')
)
BP Exploration
Operations Summary Report
13~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-09
W-09
REENTER+COMPLETE
DOYON
DOYON 16
Start: 7/2/2004
Rig Release: 8/18/2004
Rig Number:
Spud Date:
End:
Date From - To Hours Task Code NPT Phase Description of Operations
7/23/2004 17:00 - 17:30 0.50 FISH N OFAL WEXIT weight by 5k until fish came free after jarring at 250k and
pickuing up to 290K.
P/U 198k S/O 140k
17:30 - 00:00 6.50 FISH N OFAL WEXIT POH with overshot and fish.
Midnight depth: 1300'
7/24/2004 00:00 - 01 :00 1.00 FISH N OFAL WEXIT Continue POH with overshot and fish.
01 :00 - 03:00 2.00 FISH N OFAL WEXIT LO BHA #23.
Recovered: starter mill and string mill, total length 5.77'
03:00 - 03:30 0.50 FISH N OFAL WEXIT Clean and clear rig floor.
03:30 - 04:00 0.50 STWHIP N OFAL WEXIT PJSM with BOT, Sperry and all rig personnel on picking up and
running milling BHA.
04:00 - 05:30 1.50 STWHIP N OFAL WEXIT PU and MU window milling BHA #23, with HTC high speed
diamond mill and 3-5/8" SperryOrill 0.0 degree motor.
05:30 - 07:00 1.50 STWHIP N OFAL WEXIT RIH with mills, breaking circulation every 35 stands.
07:00 - 08:00 1.00 STWHIP N OFAL WEXIT PJSM. Cut and slip drilling line
08:00 - 13:00 5.00 STWHIP N OFAL WEXIT RIH with mills to 14329, breaking circulation every 35 stands
13:00 - 14:00 1.00 STWHIP N OFAL WEXIT MU top drive and wash down from 14329' to 14632'.
P/U 205k S/O 137k
3 bpm @ 1000 psi
14:00 - 00:00 10.00 STWHIP P WEXIT Mill window from 14636' to 14647'.
WOM = 4-7 klbs
RPM Surf= 50, OH = 255
Torque on Btm = 6k-8k FtLb
BPM = 3.6 @ 1550 psi on Btm,
P/U 205k S/O 138k ROT 168k
7/25/2004 00:00 - 01 :30 1.50 STWHIP P WEXIT Continue milling window and from 14647' to 14648'. Orill new
hole to 14662' for FIT. Recovered 61bs metal cuttings with the
consistency of steel wool.
WOM = 4-5 klbs
RPM Surf= 40, OH = 245
Torque on Btm = 7k-8k FtLb
BPM = 3.6 @ 1650 psi on Btm,
P/U 205k SIO 138k ROT 168k
TOW - 14636'
BOW - 14648'
01 :30 - 02:00 0.50 STWHIP P WEXIT Work through window while circulating 100 bbls, 3.8 BPM @
1350 psi, to clean up new hole and 5-1/2. liner.
02:00 - 03:00
1.00 STWHIP P
WEXIT
Pull mills above whipstock and perform 10.0 ppg EMW FIT:
TMD = 14642'
TVD = 8755'
MW = 8.45 ppg
Printed: 8/2312004 9:23:01 AM
SCJ\NNEL} NOV ]
2DD~:
)
')
Page 14 48Þ
BF> Exploration
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-09
W-09
REENTER+COMPLETE
DOYON
DOYON 16
Date From - To Hours Task Code NPT Phase
7/25/2004 02:00 - 03:00 1.00 STWHIP P WEXIT
03:00 - 04:30 1.50 STWHIP P WEXIT
04:30 - 05:00 0.50 STWHIP P WEXIT
05:00 - 08:00 3.00 STWHIP P WEXIT
08:00 - 10:00 2.00 STWHIP P WEXIT
10:00 - 10:30 0.50 STWHIP P WEXIT
10:30 - 16:30 6.00 STWHIP P WEXIT
16:30 - 19:00 2.50 STWHIP P WEXIT
19:00 - 19:30 0.50 STWHIP P WEXIT
19:30 - 20:00 0.50 STWHIP P WEXIT
20:00 - 20:30 0.50 STWHIP P WEXIT
20:30 - 00:00 3.50 STWHIP P WEXIT
7/26/2004 00:00 - 00:30 0.50 STWHIP P WEXIT
00:30 - 06:30 6.00 STWHIP P WEXIT
06:30 - 12:30 6.00 STWHIP P WEXIT
12:30 - 13:00 0.50 STWHIP P WEXIT
13:00 - 00:00 11.00 DRILL P PROD1
7/27/2004
6.00 DRILL P
00:00 - 06:00
2.00 DRILL N
DPRB PROD1
SC/\NNEtJ NO\! 1
Start: 7/2/2004
Rig Release: 8/18/2004
Rig Number:
Spud Date:
End:
Description of Operations
Surf press = 705 psi
Drop dart and pump open circ sub at 3.6 bpm. Circulate to
clean hole, 12 BPM @ 3420 psi.
POH, placing circ sub at 5-1/2" liner top.
Pump and circulate around 40 bbl hi-vis sweep, 12 bpm @
3450 psi. CBU X 3
Pump and circulate around 20 bbl Super Lift sweep, 11 bpm @
3300 psi.
Total metal cuttings recovered = 6 Ibs
Monitor well - Static. Blow down top drive.
POH with milling assembly.
Monitor well - static. LD Milling BHA.
Clean and clear rig floor. MU ported sub and flush BOP stack.
Rig service.
PJSM with Sperry and all rig personnel on picking up and
running directional BHA.
PU and MU BHA #25, directional assembly.
Shallow test MWD tools.
RIH with directional BHA picking up 102 joints of 2-7/8" SWDP
from pipe shed. Fill DP and test MWD after picking up 50
joints.
Continue RIH with BHA #24 on 4" DP. Break circulation and
check MWD every 35 stands.
Orient tool to 40L and RIH with no rotation or pump to 14660.
P/U 190k S/O 137k ROT 165k
Directional drill 4-3/4" production hole from 14662' to 14810'.
Sliding 100% to build angle.
WOB = 8-10 klbs
RPM Surf= 0, DH = 204
GPM = 150 @ 2150 psi on Btm, 20
P/U 190k S/O 137k ROT 16
ASl: st 24 hrs. = 9.25 hrs.
T last 24 hrs. = 0.00 hrs.
Directional drill 4-3/4" production hole from 14810' to 14913'.
Sliding 100% to build angle.
WOB = 5-10 klbs
RPM Surf = 0, DH = 204
GPM = 150 @ 2400 psi on Btm, 2200 psi off Btm
P/U 195k S/O 140k ROT 165k
Unable to build angle required for well plan. After the surveys
were corrected it was determined that there was an unknown
tool face offset error, the tool face was 60-90 degrees left of
scribe.
POH to above window at 14629' and circulate, 143 gpm @
Printed: 8/23/2004 9:23:01 AM
WELL LOG TRANSMITTAL
(%'1- 051
12.' 1«&'
RECEIVED
SEP 2 8 2004
')
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: -Robin D0030n-
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
AJaska Oil & Gas Cons. ,",un 1¡ ~ 1!~1~}!'
SePtem~~004
RE: MWD Formation Evaluation Logs W-09APB1,
AK-MW-3126704
1 LDWG formatted Disc with verification listing.
API#: 50-029-21947-70
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date: (0/01(01
Si~/L
~ÇANNED NO \i 0 ð '2JIUL¡
"
f/) r3
f,11 i 1----
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
20 MC 25.280
1. Type of Request:
III Abandon
0 Alter Casing
0 Change Approved Program
0 Suspend 0 Operation Shutdown 0 Perforate 0 Waiver 0 Other
0 Repair Well III Plug Perforations [] Stimulate 0 Time Extension
0 Pull Tubing 0 Perforate New Pool 0 Re-Enter Suspended Well 0 Annular Disposal
4. Current Well clas7s: 5. Permit To Drill Number
181 Development D Exploratory 189-054 / n r-. .......
D Stratigraphic Test D Service 6. API Numbef:' ~ ( : 1-::/, I~
50-029-21947-00-õ'rf ~ Ven
9. Well Name and Number: /JU/v 0 1 ..
PBU ~b . 2004
10. Field / Pool(s): ()i/ & fiBS Con
ADL 047453 . '.'.' '..." ,".' . ..~" .~_rudh?e Bay F~eld / Prudhoe Bay~~ S. COf11tni$liOI1
. . . PREseNTWEI.;L'CONDlTION SUMMARY; .~. 1ift;
Tota. I. D. ep. .th TVD (ft): IE. ffec.tive Depth MD .(ft.): Effec. ti.ve Depth TVD (ft): Plugs (measured): Junk (measured):
9199 15306 9129 14274' None
~ngttf: 'Sizê:;~\i:t. . ~';"I4Ð'~,';'"cl~; TV.~1i;: ;ßùJl.k. ,(;Óllapse
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
7. KB Elevation (ft): 90.66'
8. Property Designation:
11.
Total Depth MD (ft):
15430
. C:ásîng .
Structural
Conductor
Surface
Intermediate
Production
Liner
110' 20" 110' 110'
3264' 13-3/8" 3264' 2650' 4930
14638' 9-5/8" 14638' 8753' 6870
1069' 5-1/2" 14359' - 15428' 8596' - 9198' 7740
2270
4760
6280
Perforation Depth MD (ft/)' I Perforation Depth TVD (ft): I Tubing Size:
14906' - 15154' 8904' - 9044' 4-1/2", 12.6#
Packers and SSSV Type: 9-5/8" x 4-1/2" Baker 'SB-3' packer; 2 External Casing
Packers; 4-1/2" Otis SSSV Nipple
12. Attachments:
181 Description Summary of Proposal D BOP Sketch
D Detailed Operations Program
14. Estimated Date for
Commencing Operations:
16. Verbal Approval:
Commission Representative:
17, I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Bill Isaacson Title Senior Drilling Engineer
Signature¡JJl:). t
June 2, 2004
Date:
Tubing Grade: Tubing MD (ft):
L-80 14369'
Packers and SSSV MD (ft): 14281'; 14937' &
15153'; 2306'
13. Well Class after proposed work: /
D Exploratory 181 Development D Service
15. Well Status after proposed work:
DOil DGas
DWAG DGINJ
D Plugged
DWINJ
181 Abandoned
D WDSPL
Contact Thomas Schaefer, 564-4685
Phone 564-5521
'~mliii~~iQìtq_,..oht~( .
Date ~/'I dL/
Prepared By Name/Numbe~
Terrie Húbble, 564-4628
I Sundry Number:q-)y . ;),d-e
0 Plug Integrity
D BOP Test
Conditions of approval: Notify Commission so that a representative may witness
D Location Clearance
D Mechanical Integrity Test
lo-4o( ""'~Y'<.J -CoV ~J.R1r0«k v..<-tt[ W-o9A-.
RBDMSBFl 'JUN 0 ~ '1lìnlJ
^ ::ï>IHOVed ;--0 ÝkA...
Other: I \t
COMMISSIONER
BY ORDER OF
THE COMMISSION
D~ ~f-
ORIGINAL
bp
To:
Winton Aubert - AOGCC
Date:
May 31, 2004
From:
Thomas Schaefer - BPXA GPB Rotary Drilling
Subject:
Reference:
W-09 Application for Sundry Approval - Preparation for RWO, RST Sidetrack
API # 50-029-21947-00
Approval is requested for the proposed P&A of PBU well W-09. Well W-09 was drilled and
completed in mid 1989. A RWO was performed in 1990, followed by hydraulic fracture stimulation. The
gross fluid rate has remained fairly stable, around 1,500bfpd for the last several years, but the water-cut
has gradually increased to near 100%. The water production mechanism may be fracture related, along
with local coning from the oil water contact. Gas production has been around 1 MMSCFD for the last 5 /'
years i.e. not a significant problem for the well. The well has been shut in since early 2003, aside from a
brief production period during which some well tests were obtained.
Well W-09 currently has a 133/8" casing leak, which allows outer annulus pressure test fluids to
appear in the cellar as they are pu . The II also has tubing by inner annulus communication; the*
source of this leak has not ye een diagnos . The 9 5/8" casing integrity has not been established to
date, due to a suspected I king tail i ug. No caliper survey has been run to establish tubing
condition, as it is planne to r e the existing tubing with chrome tubing during the proposed RWOI ~
sidetrack.
The AWO/AST is scheduled for Doyon rig #16. Current estimates have the RWO beginning
around June 10, 2004, following AWO operations on W -11. The pre-rig work for this RWO I AST is
planned to begin as soon as the attached Application for Sundry is approved.
SCODe
Notify the field AOGCC representative with intent to plug and abandon
Pre-Ria Operations:
1. Function all tubing hanger and 9 5/8" casing pack-off lock down screws and verify free movement.
Completely back out and check each lock down screw for breakage; check one at a time. Complete
as of 5/29/04.
2. PPPOT-T, last completed 5/25/2003, passed test to 5,000psi. PPPOT-T complete as of 5/29104. (-~ \
PPPOT-IC failed test; appears to be plastic packed; will change out IC pack-off during RWO. -- -;¡.¡.J<- n 5
3. MIT OA to 2,400psi failed. (Conducted 7104/2003. Crude appeared in cellar with 1 ,200psi applied.) ~ ../'p h7 c...
4. A/U and fluid pack the tubing and the tubing X 9 5/8" annulus. CMIT T X fA to 2,500psi for 30 minutes. /'
5. A/U slick-line. Dummy off any live GLM.
6. AIH and pull the PX plug from the 'X' nipple at 14,274'md. ~
7. A/U coil tubing. RIH and P&A the 5 112" liner and open perforations with 23b s of 15.8ppg class 'G'
slurry. Leave cement top at 14,750'md. /
8. A/U slick-line. Drift the 4 W' tubing and tag TOC. Confirm sufficient clearance for the 4 W' tubing
chemical cutter (3 5/8" O.D.) to the planned cut depth of -14,267'.
9. Pressure test against the cement plug to 3,500psi.
10. A/U E-line. AIH with tubing punch and shoot holes above and below the packer. POOH.
11. AIH wi a 3 5/8" chemical cutter. Cut the 4 112" tubing between -14,267' in an attempt to leave a 7'
stub for fishing above SWS nipple.
12. Circulate the well with clean seawater through the tubing cut. Freeze protect tubing and casing with
diesel from 2,200' to surface.
13. Pressure test the well to 3,500psi. Bleed casing and annulus pressures to zero.
W-O9 Application for Sundry
^
14. Set a BPV. Secure the well. Remove the wellhouse. Level the pad as necessary.
T~~ \0- 4o~ ~frot/~/.
Ria Operations:
1. MI I RU Doyon rig 16.
2. R/U lines and circulate out diesel freeze protection and displace the well to seawater. Install TWC.
3. Nipple down the tree. Nipple up and test the BOPE to 3,500psi.
4. Pull BPV.
5. R/U. Pull the 4%" tubing from the cut at -14,267' MD and above.
6. M/U OIS, 4 %" grapplelwash pipe assembly. RIH, picking up 4" drill pipe, and latch the tubing stump at
-14,267'.
7. Retrieve the Baker E-22 anchor seal assembly. POOH.
8. M/U a Baker PRT packer milling assembly.
9. RIH to Baker SB-3 permanent packer. Mill packer free per Baker representative. Circulate. POOH.
10. M/U 9 5/8" casing scraper assembly. RIH to 5 %" liner top. Circulate well bore clean. Test 9 5/8"
casing to 3,500 psi. POOH. If there is a leak it will be necessary to RIH with an RTTS and locate the
leak.
11. M/U a HES 9 5/8" Composite Bridge plug. RIH and set at -2,800' MD (adjust depth if leak is deeper
than this configuration allows).
12. Test the 9 5/8" CBP to 3,500psi.
13. Break BOP stack, PU, and tac weld 9 5/8" slips to casing. Set stack down, N/U and test to 3,500 psi.
14. M/U a 9 5/8" casing cutting assembly, per Baker representative.
15. RIH and cut the 9 5/8" casing at -2,200' MD. POOH. ..,,-/
16. Spear the 9 5/8" casing. Circulate the casing annulus with 9.4-9.6 ppg brine and POOH laying down /'
casing from cut at 2,200'.
17. M/U a 133/8" casing scraper assembly. RIH to 9 5/8" casing stub. Circulate well bore clean with 9.4-
9.6 brine.
18. M/U a HES 13 3/8" Composite Bridge Plug. RIH and set CBP at -2,100'md (above casing stub).
POOH.
19. M/U and RIH wi RTTS and isolate 13 3/8" leak wi 2,500 psi.
20. M/U a 13 3/8" casing cutting assembly, per Baker representative.
21. Obtain accurate wellhead measurements in preparation for welding on a new wellhead.
22. RIH and cut the 13 3/8" casing in the middle of the first full joint below the damage. POOH
23. NID BOPE.
24. Be prepared to M/U 13 3/8" casing spear assembly if casing will not pull freely. Pull the 13 3/8" casing
and cut in segments small enough to be removed below rig floor.
25. M/U the Baker 13 3/8" casing back-off assembly. RIH and back off the cut 13 3/8" stub. POOH.
If necessary rig up diverter (or 3" cam/ock fitting on valve welded to 20" conductor), m/u wash pipe
and milling assembly. Clean out around 13 3/8" stump to clear the 13 3/8" annulus down to the
casing collar. .
26. M/U 13 3/8" spear assembly. RIH and recover the 13 3/8" stub.
27. M/U Baker guide sub and new 13 3/8" casing. RIH and thread into casing stump. Pressure-test the
new 13 3/8" casing to 2,500psi.
28. Set the 13 3/8" casing on slips.
29. Measure casing and prepare cellar area for making casing cut. (Minimal change in height from
previous wellhead will allow for the S-riser to be used without modification.) Cut and dress the 133/8"
casing stump.
30. Install bell nipple, new 9 5/8" casing head, and 4 W' tubing head.
31. N/U and test BOPE. Test the 133/8" casing to 2,500 psi.
32. R/U and perform 1" cement top job on 13 3/8" annulus.
33. M/U a 12 1/4" clean out assembly. RIH and drill up the 133/8" HES Composite Bridge plug. Chase
junk down to the 9 5/8" casing stub at 2,200'. Circulate the well clean. POOH.
34. M/U the Baker 9 5/8" casing back-off assembly. RIH and use drill collars to push junk on top of stub
down into and past stub. Back off the cut 9 5/8" stub. POOH.
35. M/U 9 5/8" spear assembly. RIH and recover the 9 5/8" stub.
36. M/U Baker guide sub and sufficient joints of new 9 5/8" casing. Freeze protect 9 5/8" X 13 3/8"
annulus. Thread into casing stump.
W-O9 Application for Sundry
37. Pressure-test the 9 5/8" casing to 3,500psi.
38. N/D and raise BOPE stack.
39. Set the 9 5/8" casing on slips. Cut 9 5/8" casing with Wachs cutter. Set back BOPE stack.
40. N/U and test BOPE. Test casing to 3,500 psi for 30 minutes.
41. M/U 8 1/2" clean out assembly, RIH, and drill 9 5/8" CBP and push junk to 5 W'liner top at 14,359'.
POOH.
42. M/U 4 3fi¡" mill and 9 5/8" scraper on a tapered string of 2 7/8" X 4" drill pipe complete with Gamma
Ray tool.
43. RIH, mill junk, and dress off P&A plug top at 14,750'md till firm. Circulate well clean. Displace well to
8.5ppg Flo-Pro fluid. POOH. .
44. Pressure-test the 9 5/8" casing X 5 Y2" liner to 3,500psi for 30 minutes. Record test.
45. P/U and RIH with 51/2" Baker bottom-trip anchor whip stock assembly. Orient whip stock, as desired,
and set on cement plug. Shear off of whip stock.
46. Mill window in 5 1/2" liner at -14,655' MD, plus approximately 20' beyond middle of window. Circulate
the well bore clean.
47. Pull up into 51/2" liner and conduct an FIT to 10.0ppg EMW. POOH.
48. M/U 4 3fi¡" Dir/GR/Res assembly. RIH, kick off and drill the 4 3/4" production section to TD of 17,450'
MD per directional proposal. .
49. Circulate well bore clean, short trip to the window. Circulate bottoms up, spot liner running pill. POOH.
50. Run and cement a 3 W', 9.2#, L-80 solid production liner, with the liner hangerlpacker extending
above the 5 Y2" liner top, as per well plan. POOH.
51. Test the 9 5/8" casing X 3 W' liner to 3,500psi for 30 minutes. Record the test.
52. P/U and RIH with Schlumberger 2" powerjet TCP perforating guns on 2 1/16" tubing. Perforate
approximately 1,100' of Z4 interval, per subsurface team. POOH.
53. R/U and run a tapered 4 Y2", 12.6# X 3 1/2", 9.2#, 13Cr-80, VAM TOP tubing completion, placing the
TT into the liner top TBS at -14,200'md.
54. Set packer and individually test the tubing and annulus to 3,500psi for 30 minutes. Record each test.
55. Set a TWC and test from below to 1,000psi.
56. Nipple down the BOPE. Nipple up the tree and test to 5,000psi. Pull the TWC.
57. Freeze protect the well to -2,200'. Install BPV and test to 1,000psi. Secure the well.
58. Rig down and move off.
Post-RiQ Operations:
1. MI I RU slick line. Pull the ball and rod I RHC plug from landing nipple below the production packer.
2. Retrieve the DCR shear valve. Replace with DV.
Estimated Pre-rig Start Date:
06/1/2004
Thomas Schaefer
Operations Drilling Engineer
564-4685
W-O9 Application for Sundry
TREE =
WELLHEAD =
ACìUATOR=
KB. ELEV =
BF. ELEV =
KOP=
Max Angle =
Datum MD =
Datum lVD =
4" CrN
FMC
OTIS
90.66'
53.96'
904'
61 @ 9500'
14882'
8800' SS
SAFETY NOTES: 5-112" TlW SEAL STEM LANDED
IN LNR HGR TIEBACK SLV
W-O9
OA near surface leak found
5/04
13 3/8" TOC near surface,
tob job on primary cmt job
OA Arctic Packed w/ dry
crude to shoe
H4-1/2" OTIS SSSV NIP, ID = 3.813" I
2306'
.
GAS LIFT MANDRELS
DEV TYÆ VLV LATCH
59 OTIS RA
56 OTIS RA
54 OTIS RA
56 OTIS RA
13-3/8" 68# L-80 BTC, ID = 12.415" H
3264' I
ST MD lVD
4 4141 3011
3 8724 5508
2 11938 7216
1 14246 8442
PORT DATE
L
II
i!
I ~,
~ -CB:!
I
~ Z:-:-1
,W ~..
i Qj"-J
~.j';,.j. ." .'.. I
ÌI:ì~.'i '
:~
~ ~
~'....
I. .
~
"'f
I 9 5/8" TOG ITBX height H 6,890' I
I 41/2" PX plug, set 7/08/03H 14,274' I
14274' IJ4-1/2"PARKERSWSNIP,ID=3,813" I
14280' IJBAKERTBGANCHOR I
Minimum ID = 3.725" @ 14357'
4-1/2" OTIS SSSV NIPPLE
14281' H9-5/8" X 4-1/2" BAKERSB-3 ÆRMPKR, ID= 3.99" I
H4-1/2" PARKER SWS NIP, ID = 3.813" I
H4-1/2" OTIS XN NIP, ID = 3.725" I
H4-1/2" X 5-112" XO I
H5-1/2" TrN SEAL STBIiIW/O SEALS I
H ELMD TT LOGGED 09/21/91 I
14335'
14357'
14369'
14369'
14366'
I TOPOF5-1/2"LNRH 14359' l
I 4-1/2" TBG, 12,6#, L-80, ID = 3,958" H 14369' I
I 9-5/8" 47# NS-80S NSCC ID = 8.681" H 14638' I
14685' HMARKERJOINT I
PERFORATION SUMMARY
REF LOG: SWS - BHCS ON 06/22/89
ANGLE AT TOP PERF: 55 @ 14982'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA TE
3-3/8" 4 14982 - 14996 0 07/14/91
3-3/8" 4 15000 - 15036 0 07/14/91
3-3/8" 2 15044 - 15084 0 07/02189
3-3/8" 2 15094 - 15154 0 07/02/89
3-3/8" 4 14906 - 14948 0 07/18/91
14937' HEXTCSG PKR I
15153' H EXT CSG PKR I
I PBTD H 15300' I
5-112" LNR, 17#, L-80, ID = 4.892" H 15428' I
PRUDHOE BA Y UNIT
WELL: W-09
ÆRMIT No: I':¡ 890540
API No: 50-029-21947-00
SEC 21, T11 N, R12E. 1437' SNL & 1194' WEL
DATE REV BY COMMENTS
07/02/89 OFF ORIGINAL COMPLETION
09/04/01 RN/TP CORRECTIONS
01/26/04 Rtv1OfTLP MINIMUM 10 CORRECTION
OS/28/04 T JS OA/IA STATUS
DATE
REV BY
COMMENTS
BP Exploration (Alaska)
'TREE ==
WELLHEAD ==
ACTUATOR ==
KB. ELEV ==
BF. ELEV ==
KOP==
Max Angle ==
Datum MD ==
Datum ND =
4"CrN
FMC
OTIS
90.66'
53,96'
904'
61 @ 9500'
14882'
8800' SS
W-O9 Pre Rig
I SAFETY NOTES: 5.1/2" TlW SEAL STEM LANDED
IN LNR HGR TIEBACK SLY
13-318" 68# L-BO BTC, Ð == 12,415" H
3264'
.
2306'
H4-1/2" OTIS SSSV NIP, ID = 3.813" I
OA near surface leak found
5/04
133/8" TOC near surface,
tob job on primary cmt job
OA Arctic Packed w/ dry
crude to shoe
\ Minimum ID = 3.725" @ 14357' I
4-112" 011S SSSV NIPPLE
L
ST MD lVO
4 4141 3011
3 8724 5508
2 11938 7216
1 14246 8442
GAS LIFT MANDRELS
DEV lYPE VLV LATCH
59 am RA
56 om RA
54 am RA
56 OTIS RA
PORT DA 1E
I Pre.rig chem cut 41/2" tubing
l-t 14,267' 1
9 5Ifr' lOG max height
H 6,890' I
14274' LJ4-1/2" PARKER SWS NIP, Ð == 3,813" I
14280' UBAKERTBGANCHOR I
I Pre-rig punch holes abv/blw pkr 1-1 14,281' 1
--
-
14281' H9-5/8" X 4-112" BAKER Sß..3 PERM PKR, ID == 3.99" I
14335" H4-112" PARKER SWS NIP, ID == 3.813" I
[ TOP OF 5-112" LNRH 14359' l
14357'
14369'
H4-1/2" am XN NIP, ID == 3.725" I
H4-112" X 5-112" XO I
HS-112" TfJV SEAL STEM W/O SEALS I
H ELMDTTLOGGED09/21/91 1
4-112" TBG, 12.6#, L-80, ID == 3.958" H 14369'
14369'
, 9-518" 47# NS-8OS NSCC ID == 8,681" H 14638' I
14685' HMARKER JOINT I
I Pre-rig cement P&A plug
H 14,750' I
14937' HEXTCSG PKR I
~T~SUMMARY
REF LOG: SINS - BHCS ON 06/22/89
ANGLE AT TOP PERF: 55@ 14982'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA TE
3-3/8" 4 14982 - 14996 0 07/14/91
3-3/8" 4 15000-15036 0 07/14/91
3-3/8" 2 15044 - 15084 0 07/02/89
3-3/8" 2 15094-15154 0 07/02/89
3-3/8" 4 14906 - 14948 0 07/18/91
15153' HEXTCSG PKR I
I PBTD H 15300' I
5-1/2" LNR, 17#, L-80, ID = 4.892" 1-1 15428' I
DATE
07/02/89
09/04/01
01/26/04
OS/28/04
REV BY COMMENTS
OFF ORIGINAL COM PLETION
RNITP CORRECTIONS
RMQITLP MINIMUM ID CORRECTION
TJS OA/IA STATUS/PRE-RIGWORK
DATE
REV BY
COMMENTS
PRUDHOE BAY UNIT
WELL: W-09
PERMIT No: '1890540
API No: 50-029-21947-00
SEC 21, T11N, R12E. 1437' SNL & 1194' WEL
BP Exploration (Alaska)
TREE =
WELLHEAD =
ACTUATOR =
KB. ELEV =
BF. ELEV =
KOP=
Max Angle =
Datum MD =
Datum1VD=
41/16"
FMC
OTIS
90.66'
53.96'
904'
61 @ 9500'
14882'
8800' SS
W-O9A Proposed Completion
1 13-3/8" CSG, 68#'11
L-80, 10 = 12.415"
3,264' 1
==:¡
I
::::¡
==:¡
==:¡
=::¡:
=::¡:
I
Z
I XO 3 1/2" to 7" WLEG H 14,190' 1 ~ )
I Top 5-1/2" Liner H 14359' 1 r ,
I 9-5/8",47#, NS- 11 14638' 1
80S, ID = 8.681"
Marker joint
H 14,685' 1
I External casing pkr 1-1. 14,937' 1
I External casing pkr H
15,153' 1
1
1
PBTD H 15300'
I 5-1/2" Liner. 17#, H 15428'
1 L-80, 10 = 4.892" 1 1
DATE
07/02/89
09/04/01
01/26/04
04/26104
REV BY COMNENTS
DFF ORIGINAL COM PLErION
RNlTP CORRECTIONS
RMOITLP MINIMUM 10 CORRECTION
dew Proposed ColllJletion
DATE
I 2,200' H3 1/2" 'X'ianding nipple, 10 = 2.813"1
GAS LIFT MANDRELS
ST MD 1VD DE\! 1YPE VLV
6 2150 2000 40° 31/2" X 11/2" MMG OV
5 4340 3200 59° 31/2" X 1 1/2" MMG OCR
4 6720 4500 55° 31/2" X 1 1/2" MMG OV
3 8995 5750 57° 31/2" X 1 1/2" MMG OV
2 114107000 56° 31/2"X11/2"MMG DV
1 13690 8250 59° 31/2" X 1 1/2" MMG DV
LATCH
RK
RK
RK
RK
RK
RK
I 14,125' J3 1/2" 'X' landing nipple, 10 = 2.813" 1
I 14,145' H 9 5/8" X 4 1/2" Baker S-3 Packer 1
I 14,170' J3 1/2" 'X' landing nipple. 10 = 2.813" I
1 14,190' 1-131/2" 'X' landing nipple. 10 = 2.813" I
I 14,190' J31/2", 9.2#, 13Cr-80, VAMTOPtubing
I 14,200' H7" X 9 5/8" Baker ZXP liner top packer, wI TBS,
HMC liner hanger crossed over to 31/2" liner.
114655' JWindow exit in 51/2" liner from
, 1 Whipstock set on EZSV
0000000000000001--
000000000000000
000000000000000 ----
I 17,450' J31/2", 9.2#, L-80, IBT-M solid liner 1
REV BY
COMMENTS
PRUDHOE BAY UNIT
WELL: W-09A
ÆRMIT No:
APt No: 50-029-21947-01
SEC 21, T11 N, R12E. 1437' SNL & 1194' WEL
BP Exploration (Alaska)
~
:?
;¡,
0
Ë
.c
ë. 8400
"
Q
<i
()
'f:
"
..
"
"
þ
COMPANY DErAILS
BPAm"o
REFERENCE INFORMATION
Co~""~,,, (NIB) "f"""", Woll eenlre W-Å’. T... North
V"""'(TVD)"f"""" 8196'8196
S,,"oo (VS) Rof="", Slot. (1J ooN,O.ooE)
M"'~~'::::~~ ~:,:;'""J'~
SURVEY PROGRAM
DoplbFm DoplbTo S""oylP""
Tool
Plan W-<)9A ",,04 Deep KlO (W-09/Plan W-œA Deep KlO)
Crealod By Troy Jakabosky Dale 4/8/2004
14655.00 1744934 p"""",,, W-O9A.>04DoopK/OV
MWD
C.I"tb"ooMothod. Mmmooo"""'ture
~~"'gJ. 'r';;~~~"""Nortb
w:.;t: ~~.:.:..""..,
Checked
Dale_-
Rovtewod
Date ~-
FORMATION TOP DETAILS
WELL DETAILS
N- +N/-S +Fl.W North.., _oS ""'- Co08'- Slo<
W-09 159468 211163 595882004 61204908 70'17'47ISm 149"O5'\3569W NIA
TARGET DETAILS
~ TVD +NI-S +Fl-W Nortbm¡¡ Eo.~.. S""po
W-09ADIP 886096 -10799.80 -512310 5947946 00 60708799 Po..'
W-09A T2 MID 46P 8865.96 -10879M -486424 594787000 60734799 PotDl
W-09A T445N 888496 -10515.00 -5536.01 594822458 60667091 Pooo<
W-09A TI LP 888996 -1082310 -429828 5947935.00 60791299 Pooo<
W-09APoly 8889 96 -1082310 -429828 5947935.00 60791299 PolY800
W-<J9AT5ID 903196 -1006210 -603228 5948670.00 60616799 Pooo<
SECTION DETAILS
See MD Inc AzI TVD +N/-S +E/-W DLeg TFace VSec Target
I 14655.00 55,70 227.36 8758,75 -10254,24 -3860,79 0.00 0.00 3860.79
2 14675.00 57.38 225.31 8769.78 -10265.76 -3872.85 12.00 -46.00 3872 85
3 14954.51 84.38 20396 8861.42 -10481.85 -4017.16 12.00 -40.98 4017.16
4 15065.77 84.38 203.96 8872.32 -10583.04 -4062.13 0.00 0.00 4062.13
5 15410.41 90.00 245.00 8889.96 -10823.10 -4298.28 12.00 83.58 4298.28 W-09A TI LP
6 15598.73 92.93 267.42 8885,08 -10867.71 -4479.92 12,00 82.35 4479.92
7 15912.06 92.93 267.42 8869.06 -1088181 -4792.52 0.00 000 4792.52
8 15983.94 92.00 276.00 8865.96 -10879.67 -4864,24 12.00 96.00 4864.24 W-09A T2 MID 46P
9 16004.80 91.31 278.40 8865.36 -10877.06 -4884.92 12.00 106.06 4884.92
10 16056.75 9131 278.40 8864.17 -10869.47 -4936.30 0.00 0.00 4936.30
II 16257.62 90.50 302.50 8860.96 -10799.80 -5123.10 12.00 91.70 5123.10 W-09A T3 IP
12 16263.06 89.98 302.11 8860,94 -10796.89 -5127,69 12.00 -143.02 5127.69
13 16512.6\ 89.98 302.11 8861.03 -10664.25 -5339.07 0.00 0.00 5339.08
14 16761.57 79.00 312.30 8884.96 -10515.00 -5536.01 6,00 137.64 5536.01 W-09A T445N
\5 16784.35 7764 31239 8889.57 -1049998 -5552.50 6.00 176.49 5552.50
16 17449.34 77.64 312.39 9031.96 -10062.10 -6032.28 0.00 0.00 603228 W-09A T5 TD
CASING DETAILS
No. TVDPath
MDPath Formahon
No. TVD
MD
Name
SIZe
8765.96 14667.97 TSHU
0.00 0.00 TElL
0.00 0.00 TSAD
17448.00 3 1/2"
9031.67
3.500
7800-
8100-
8700
S:artDIf 1'/100' I4»S' /.fn. gcSS7S'T\I[>
J t.nd Ult :14""-' ¡ MU, ""&J.~2' \ YU
I St"tO"'?/IQO"¡,OAQ"MO,RR7? 32'1Y)
¡ I Fn~"" 1".'7""'" 8,R,nR'TVTI
! Stnrt D" l2ItOC' S912.~6' MD, C8<Y).06'TVC
En~ IJIr . 16004..' MD, 8&SS.Jó' TVD
. .) I' StaJtJ.:Ir.2/00.jtJ(¡'Ó.I;'M~'..,~86->.I"IVlJ
;---.. ! -_.. £~._&.
. I J. I I !. ,",/
0 1\ , ;:, ¡Jot - \, IO>UU , ~
\jSGO ' \ \, -¡{jJ9!.. T3 IF - Þ
W09'\-LP W-09A.T2MIIJ'líP W.)QAT"A<N 170)0
15704.,S' MI:, 8;!8\57' TVD
9000
~---J
W-O9A-STD ~
11,2"
"-
Total Deoth - 174"-9.,4' MD, 9J31.9C TVr: W-IJ9 ~ "'PC4 Dee::> KfO
3600
4800
5400
6300
5700
6000
5100
3900
4200
4500
Vertical Sectional 270.00' [300ft/in]
....... .. 'Y-!iiiLr1
Q'ULLING ....VIC..
,"""""""'.,...""
-10200
:s
4::
0
0
1:1
+'
:E'
1::
~
:E'
g
<J;
-10500
-10800
-ll100
COMPANY DETAILS
BP Am",o
REFERENCE INFORMATION
Co~...",~(NÆ)R,r."'n" W,llC<n",W.o'.TruoN"""
V,"",I(fVD)R,r"""" '196"196
Soct..n(VS)",r",,~ Slot- (OOON.OOOE)
M""'C'.~~O~'= ~~:~~~~
Caku,,",tooMothod. "_œnCw-w<turo
Enot Sy>tem I8CWSA
So", Mothod Ttav Cylmdoc N"""
EnotS""", EJI",."I+Ca>-wg
W~'ogM'thod Rw..""",,
SECTION DETAILS
TolElDerth: 17449.34 IVD,9031.96'1V)
/
J
W-09A I5 TD
lind (]1T : 167~4 35' MD 888~.5'7" V)
S~rtDir6l100'; 16512.61 IVD8861.0','TVD ~
.----- -.-
-6300
-6000
-5700
Target
W-09A 11 LP
W-09A T2 MID 46P
W-09A T3 IP
W-09A T445N
W-09A T5 TD
W-09A T3 11'
-5400
-5100
SURVEY PROGRAM
DopthF", DopthTo S~oylPl-n
Tool
)465500 1744934 Planood W.o'Awp(\4000pKIOV
MWO
WELL DETAILS
No"", +NJ.S
+FJ.W
W-09 159468 215363
No""""
595882004
Eo<m,
6120490' 7O'm71'7N 14,'OS'33"9W NJA
TARGET DETAILS
PI.. W-O9A wp04 Deep IVO (W-O9/PIan W.09A Deep IVO)
Creæed By Tcoy Jakabosky
Checked
Dale 4/8/2004
Date-
See MD 1ne Azi TVD +N/-S +E/-W DLeg TFaee VSee
1 14655.00 55.70 227.36 8758.75 -10254.24 -3860.79 0.00 000 3860.79
2 14675.00 5738 225.31 8769 78 -1026576 -3872.85 12.00 -46.00 3872.85
3 14954.51 84.38 203.96 8861.42 -]0481.85 -4017.16 12.00 -40.98 4017.16
4 15065.77 84.38 203.96 8872.32 -10583.04 -4062.13 0.00 0.00 4062.13
5 15410.41 90.00 245.00 8889.96 -10823.10 -4298.28 12.00 8358 429828
6 15598.73 92.93 267.42 8885.08 -10867.71 -4479.92 12.00 82.35 4479.92
7 15912.06 92.93 267.42 8869.06 -10881.81 -4792.52 0.00 0.00 4792.52
8 15983.94 92.00 276.00 8865.96 -10879.67 -4864.24 12.00 9600 4864.24
9 16004.80 9131 278.40 8865.36 -10877.06 -4884.92 12.00 10606 4884.92
10 16056.75 91.31 278.40 8864.17 -10869.47 -4936.30 0.00 0.00 4936.30
11 16257.62 90.50 302.50 8860.96 -10799.80 -5123.10 12.00 91.70 5123.10
12 16263.06 89.98 302]] 8860.94 -10796.89 -5127.69 12.00 -143.02 5127.69
13 16512.61 89.98 302.11 8861.03 -10664.25 -5339.07 000 0.00 5339.08
14 16761.57 79.00 312.30 8884.96 -10515.00 -5536.01 6.00 137.64 5536.01
15 1678435 77.64 312.39 8889.57 -10499.98 -5552.50 6.00 17649 5552.50
16 17449.34 77.64 312.39 9031.96 -10062.10 -6032.28 0.00 000 6032.28
W-i)9A wpO4 peep Kl"J
)
-9900
Lo""""
Long""'" Slot
N<ttre TVD +N/-S +FJ.W NortIut~ ""- Sh-po
W-09A niP 8860 96 .10799 80 .512310 5947946 00 60708799 Poml
W-09A T2 MID 46P 886596 .10879.67 -486424 594787000 60734799 Poml
W.O'A T4 45N 8884 96 .10515 00 .553601 594822458 6066709) Pomt
W.09A TJ LP 888996 -JO8231O -429828 5947935 00 60791299 Pomt
W-09APoly 888996 .10823 10 -429828 5947935 00 607912 99 Polys..
W.o9A T5 TO 903196 -10062 10 -<;03228 5948670 00 60616799 Poml
FORMATION TOP DETAILS
No. TVDPath
MDPath Formation
Bod Dir : 149';4 ';1' r-.ro 8861.42'---YO
~"rtDIrI2'100' 15065.77¡MP,8S72~"TVP \
B,ùo;.. . ISSS8.73'MO,88SS~8'TVD \
"t'-1't')IrI1/100': 5>12.0('MD,8,6~.05'IV,) \.. ----'. ...-.--...-----\..----.
\
\
\ \ \ '\
\ /79000\
( - /
\OO~:- ) /
I' ~r -- .-J- -
\ ---~W-o9."'-=-ILF
~ .----
V" OO^ T2 MID 15P
I
2
3
8765.96 14667.97 TSHU
0.00 0.00 TElL
0.00 0.00 TSAD
"'01 flir I?/IOO" I""",' VIT). 87'8 7"T\Jr
\
-4800
West(-)/East(+) [300ft/in]
-4500
-4200
CASING DETAILS
No. TVD
Name
Size
MD
9031.67
17448.00 3 1/2"
3.500
\
\
\
\
--...-----.- '-'-'--' ...-
-3900
-3600
Sperry-Sun - Draft Copy
Sperry-Sun
Company:
'Field:
Sitè:
Well:
Wellilath:
Plan:
BP Amoco
PfI,Idhoe Bay
~ fiB WPad ~
W-09
Plan W-09A Deep KlO
W-09A wp04 Deep KlO
Date: 4/8/2004 Time: 16:54:55
Co-ordinàte(NE) Reference: Well: W-09, True North
Vertical (TVD) Reference: ,81.96' 82.0
Section (VS) Reference: Well (0.OÒN,0.00E,270,OOAzi)
Survey Calculation Method: Minimum Curvature Db:
Page:
1
Oracle
Principal:
Yes
Date Composed:
Version:
Tied-to:
3/22/2004
37
From: Definitive Path
Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Field:
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
bggm2003
Site:
PB W Pad
TR-11-12
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 47.83 ft
5957194.18 ft
609919.18 ft
Latitude: 70 17 31.506 N
Longitude: 149 6 36.343 W
North Reference: True
Grid Convergence: 0.84 deg
Well: W-09
W-09
Well Position: +N/-S 1594.68 ft
+E/-W 2153.63 ft
Position Uncertainty: 0.00 ft
Slot Name:
Northing:
Easting:
5958820.04 ft
612049.08 ft
Latitude:
Longitude:
70 17 47.187 N
149 5 33.569 W
Current Datum:
Magnetic Data:
Field Strength:
Vertical Section:
81.96'
4/2/2004
57567 nT
Depth From (TVD)
ft
28.96
Height
81.96 ft
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
W-09
14655.00 ft
Mean Sea Level
25.09 deg
80.81 deg
Direction
deg
270.00
Wellpath:
Plan W-09A Deep KlO
+N/-S
ft
0.00
Casing Points
MD TVD ' Diameter Hole Size Name
ft ft in in
17448.00 9031.67 3.500 4.750 31/2"
Formations
MD TVD Formations Lithology Dip Angle Dip Direction
ft ft deg deg
0.00 TMLV 0.00 0.00
0,00 TKNG 0.00 0.00
0,00 TJG 0.00 0.00
0.00 TJF 0.00 0,00
0.00 TJE 0.00 0,00
0.00 TJD 0.00 0.00
0.00 TJB 0.00 0.00
0.00 TSGR 0.00 0.00
14667.97 8765.96 TSHU 0.00 0.00
0.00 0.00 TElL 0.00 0.00
0.00 0.00 TSAD 0,00 0.00
Targets
Map Map <-- Latitude --> <- Longitude ->
Name Description TVD +N/-S +E/-W Northing Easting Deg Min See Deg Min See
Dip. Dir. ft ft ft ft ft
W-09A T3 IP 8860,96 -10799,80 -5123.10 5947946.00 607087,99 70 16 0.954 N 149 8 2.682 W
W-09A T2 MID 46P 8865.96 -10879.67 -4864.24 5947870.00 607347.99 70 16 0.170 N 149 755.146 W
W-09A T4 45N 8884.96 -10515.00 -5536.01 5948224.58 606670.91 70 16 3,752 N 149 8 14.706 W
Sperry-Sun - Draft Copy
Sperry-Sun
Company: .BP Amoco
Field: Prudl:loe Bay
Site:PB W Pad
WeD: W-09
Wellpath: Plan W-09A Deep KlO
Date: 4/8/2004 Time: 16:54:55 Page: 2
Co-ordinate(NE) Reference: Well; W-09, True North
Vertical (TVD) Reference: 81 ;96' 82.0 .
Section (VS) Reference: Well (0.00N,0.00E,270.00Azi}
Survey Calculation Method: Minimum Curvature Db: Oracle
Targets
Map Map <--- Latitude --> <- Longitude --->
Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min See
Dip. Dir. ft ft ft ft ft
W-09A T1 LP 8889.96 -10823.10 -4298.28 5947935.00 607912.99 70 16 0.730 N 149 7 38,674 W
W-09A Poly 8889.96 -10823.10 -4298.28 5947935,00 607912.99 70 16 0.730 N 149 738.674 W
-Polygon 1 8889.96 -10004.46 -5940.40 5948729.00 606258.99 70 16 8.770 N 149 8 26.489 W
-Polygon 2 8889.96 -10078.11 -6098.53 5948653.00 606101.99 70 16 8.045 N 149 831.090W
-Polygon 3 8889.96 -10591.17 -5565,08 5948148.00 606642.99 70 16 3.003 N 149 8 15.551 W
-Polygon 4 8889.96 -10931.10 -5037.04 5947816.00 607175.99 70 15 59.663 N 149 8 0,174 W
-Polygon 5 8889.96 -10979,68 -4596.68 5947774.00 607616.99 70 15 59.188 N 149 7 47.356 W
-Polygon 6 8889.96 -10875.52 -4069.02 5947886.00 608142.99 70 16 0.216 N 149 7 32.000 W
-Polygon 7 8889,96 -10590.37 -3941.74 5948173.00 608265.99 70 16 3.021 N 149 7 28.300 W
-Polygon 8 8889.96 -10566.12 -4159.43 5948194.00 608047.99 70 16 3.258 N 149 7 34.637 W
-Polygon 9 8889.96 -10725.55 -4199.81 5948034.00 608009.99 70 16 1.690 N 149 7 35.810 W
-Polygon 10 8889.96 -10812.59 -4600.19 5947941.00 607610.99 70 16 0,832 N 149 7 47.462 W
-Polygon 11 8889.96 -10770.23 -5026.64 5947977.00 607183.99 70 16 1.246 N 149 7 59.875 W
-Polygon 12 8889.96 -10487.18 -5428.50 5948254.00 606777.99 70 16 4.027 N 149 811.577 W
W-09A T5 TO 9031.96 -10062.10 -6032.28 5948670.00 606167.99 70 16 8.203 N 149 8 29.162 W
Plan Section Information
MD Ind Azim TVD +N/-S +E/-W DLS Build TUfn TFO Target
ft deg deg ft ft ft deg/100ft deg/100ft deg/10OO deg
14655.00 55.70 227.36 8758.75 -10254.24 -3860.79 0.00 0.00 0.00 0.00
14675.00 57.38 225.31 8769.78 -10265.76 -3872.85 12.00 8.42 -10.25 -46.00
14954.51 84,38 203.96 8861.42 -10481,85 -4017.16 12.00 9.66 -7.64 -40.98
15065.77 84.38 203.96 8872.32 -10583.04 -4062.13 0.00 0.00 0.00 0.00
15410.41 90.00 245.00 8889.96 -10823.10 -4298.28 12,00 1.63 11.91 83.58 W-09A T1 LP
15598.73 92.93 267.42 8885.08 -10867.71 -4479.92 12.00 1.56 11.90 82.35
15912.06 92.93 267.42 8869.06 -10881.81 -4792.52 0.00 0.00 0.00 0,00
15983.94 92.00 276.00 8865.96 -10879,67 -4864.24 12.00 -1.30 11.94 96.00 W-09A T2 MID 46P
16004.80 91.31 278.40 8865.36 -10877.06 -4884.92 12.00 -3.33 11.53 106.06
16056.75 91.31 278.40 8864,17 -10869.47 -4936.30 0.00 0.00 0.00 0.00
16257.62 90.50 302.50 8860.96 -10799.80 -5123,10 12.00 -0.40 12.00 91,70 W-09A T3 IP
16263.06 89.98 302.11 8860.94 -10796.89 -5127.69 12.00 -9.59 -7.22 -143.02
16512.61 89.98 302.11 8861.03 -10664.25 -5339.07 0.00 0.00 0.00 0.00
16761,57 79.00 312.30 8884.96 -10515.00 -5536.01 6.00 -4.41 4.09 137.64 W-09A T4 45N
16784.35 77.64 312.39 8889.57 -10499.98 -5552.50 6.00 -5.99 0.38 176.49
17449.34 77.64 312.39 9031.96 -10062.10 -6032.28 0.00 0.00 0.00 0.00 W-09A T5 TD
Survey
MD .Ind Azim TVD Sys TVD MapN MapE VS DLS TFO Tool Comment
ft deg deg ft ft ft ft ft deg/10OO deg
0.00 0.00 0.00 0.00 -81.96 5958820.04 612049.08 0.00 0.00 0.00 TSAD TSAD
14655.00 55.70 227.36 8758.75 8676.79 5948510.27 608341.92 3860.79 0.38 0.00 MWD
14667.97 56.79 226.02 8765.96 8684.00 5948502.76 608334.19 3868.63 12.00 314.00 TSHU TSHU
14675.00 57.38 225.31 8769.78 8687.82 5948498.57 608330.03 3872.85 12.00 314.74 MWD
14700.00 59.67 223.03 8782.83 8700.87 5948483.06 608315,41 3887.70 12.00 319.02 MWD
14725.00 61.99 220.86 8795.02 8713,06 5948466,61 608301.07 3902,29 12.00 320.21 MWD
14750.00 64.35 218.78 8806.30 8724.34 5948449.26 608287.04 3916.57 12.00 321.27 MWD
14775.00 66.73 216.78 8816.65 8734.69 5948431.07 608273.38 3930.50 12.00 322.21 MWD
14800.00 69.14 214.85 8826.04 8744.08 5948412.08 608260.11 3944.06 12.00 323.04 MWD
14825.00 71,57 212.98 8834.45 8752,49 5948392.35 608247.27 3957.19 12.00 323.76 MWD
14850.00 74.02 211.16 8841.84 8759.88 5948371.93 608234.90 3969.86 12.00 324,39 MWD
14875.00 76.48 209.39 8848.21 8766.25 5948350.87 608223.03 3982,05 12.00 324.93 MWD
14900.00 78.96 207.65 8853.53 8771.57 5948329.24 608211,69 3993.71 12,00 325.38 MWD
14925.00 81,44 205.94 8857.78 8775.82 5948307.09 608200.92 4004.81 12.00 325.75 MWD
14950.00 83.93 204.26 8860.96 8779,00 5948284.49 608190.74 4015.33 12.00 326.04 MWD
14954.51 84.38 203.96 8861.42 8779.46 5948280.37 608188.97 4017.16 12.00 326.25 MWD
Sperry-Sun - Draft Copy
Sperry-SUD
Company: Be Amoco. Date: 4/8/2004 Time: 16:54:55 Page: 3
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: W-09, True North
Site: PB WPad Vertical (TVD) Reference: 81.96' 82.0
Well: W-09 Section (VS) Reference: Well (0.00N,0.00E,270.00Azi)
WeJlpath: Plan W-09A Deep KlO Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD Sys TVD MapN MapE VS DLS TFO Tool Comment
ft deg deg ft ft ft ft ft deg/100ft deg
15000.00 84.38 203.96 8865,88 8783.92 5948238.73 608171.20 4035.55 0.00 0.00 MWD
15065.77 84,38 203.96 8872,32 8790.36 5948178.53 608145.52 4062.13 0.00 0.00 MWD
15075.00 84.51 205.06 8873,21 8791.25 5948170.12 608141,84 4065.94 12.00 83,58 MWD
15100.00 84.85 208.06 8875.53 8793.57 5948147.69 608131.04 4077.07 12.00 83,48 MWD
15125.00 85.22 211.05 8877.69 8795.73 5948125.85 608119.08 4089.35 12.00 83.20 MWD
15150.00 85.59 214.03 8879.70 8797,74 5948104.65 608106.00 4102.75 12.00 82.94 MWD
15175.00 85.98 217.01 8881.53 8799,57 5948084.15 608091.82 4117.23 12.00 82.70 MWD
15200.00 86.38 219.99 8883.20 8801.24 5948064.40 608076.58 4132.76 12.00 82.48 MWD
15225,00 86.78 222.97 8884,69 8802.73 5948045.47 608060.34 4149.29 12.00 82.28 MWD
15250.00 87.20 225.95 8886.00 8804.04 5948027.39 608043.12 4166.78 12.00 82.11 MWD
15275.00 87.62 228.92 8887.13 8805.17 5948010.23 608024.99 4185.17 12.00 81.95 MWD
15300.00 88.05 231.89 8888.08 8806.12 5947994.03 608005.98 4204.42 12.00 81.82 MWD
15325.00 88.49 234.86 8888.83 8806.87 5947978.83 607986.15 4224.47 12.00 81.70 MWD
15350,00 88.93 237.83 8889.39 8807.43 5947964.67 607965.56 4245.27 12.00 81.61 MWD
15375.00 89.37 240.80 8889.77 8807.81 5947951.59 607944.26 4266.77 12.00 81.55 MWD
15400.00 89.81 243.76 8889.94 8807.98 5947939.64 607922.31 4288.89 12.00 81.50 MWD
15410.41 90.00 245.00 8889.96 8808.00 5947935.00 607912.99 4298.28 12.00 81.48 W-09A T1 L W-09A TI
15425.00 90.23 246.73 8889.93 8807.97 5947928.84 607899.77 4311.59 12.00 82.35 MWD
15450.00 90.63 249.71 8889.74 8807.78 5947919.22 607876.70 4334.81 12.00 82.36 MWD
15475.00 91.03 252.68 8889.38 8807.42 5947910.81 607853.16 4358.47 12.00 82.38 MWD
15500.00 91.42 255.66 8888.84 8806.88 5947903.64 607829.23 4382.51 12.00 82.42 MWD
15525,00 91.81 258.63 8888.14 8806.18 5947897.72 607804.95 4406.87 12.00 82.48 MWD
15550.00 92.20 261,61 8887.26 8805.30 5947893.06 607780.41 4431.48 12.00 82.57 MWD
15575.00 92.58 264.59 8886.22 8804.26 5947889.69 607755.67 4456.28 12.00 82.67 MWD
15598.73 92.93 267.42 8885.08 8803.12 5947887.69 607732.06 4479.92 12.00 82.80 MWD
15600.00 92.93 267.42 8885.02 8803.06 5947887.61 607730.79 4481.19 0.00 0.00 MWD
15700.00 92.93 267,42 8879.90 8797.94 5947881,62 607631.11 4580.95 0.00 0.00 MWD
15800,00 92.93 267,42 8874.79 8792,83 5947875.64 607531.43 4680.72 0.00 0.00 MWD
15900,00 92.93 267.42 8869.68 8787.72 5947869.65 607431.74 4780.49 0.00 0.00 MWD
15912.06 92,93 267.42 8869.06 8787.10 5947868.93 607419.72 4792.52 0.00 0.00 MWD
15925.00 92,77 268.96 8868.41 8786.45 5947868.33 607406.81 4805.44 12.00 96,00 MWD
15950.00 92.45 271.95 8867.28 8785.32 5947868.15 607381.85 4830.41 12.00 96,08 MWD
15975.00 92.12 274.93 8866.28 8784.32 5947869.28 607356.90 4855.34 12.00 96.21 MWD
15983.94 92,00 276.00 8865.96 8784.00 5947870.00 607347.99 4864.24 12,00 96.33 W-09A T2 M W-09A n
16000.00 91.47 277.85 8865.47 8783.51 5947871.70 607332.03 4880.17 12,00 106.06 MWD
16004.80 91.31 278.40 8865.36 8783.40 5947872.30 607327.27 4884.92 11.99 106.11 MWD
16056,75 91.31 278.40 8864,17 8782.21 5947879.13 607275.79 4936.30 0.00 0.00 MWD
16075.00 91.24 280.59 8863,77 8781.81 5947881.87 607257.75 4954,29 12.00 91.70 MWD
16100.00 91.15 283.59 8863,25 8781.29 5947886.74 607233.24 4978.73 12.00 91.74 MWD
16125.00 91.05 286.59 8862.77 8780.81 5947892.89 607209,02 5002.86 12.00 91.81 MWD
16150.00 90.95 289.59 8862.33 8780.37 5947900.29 607185,15 5026.62 12.00 91.86 MWD
16175,00 90.85 292,59 8861.94 8779.98 5947908,94 607161.70 5049.94 12.00 91.92 MWD
16200.00 90.75 295,59 8861.59 8779.63 5947918.80 607138.74 5072.76 12.00 91.96 MWD
16225.00 90.64 298.59 8861.28 8779.32 5947929.84 607116.32 5095.01 12.00 92.01 MWD
16250.00 90.53 301.59 8861,03 8779.07 5947942.05 607094.51 5116.64 12.00 92.04 MWD
16257.62 90,50 302.50 8860.96 8779.00 5947946.00 607087.99 5123.10 12.01 92,07 W-09A T3 I W-09A n
16263.06 89,98 302.11 8860.94 8778.98 5947948.83 607083.35 5127.69 12.00 216.98 MWD
16300.00 89.98 302.11 8860.95 8778.99 5947968.00 607051.77 5158.98 0.00 0.00 MWD
16400.00 89.98 302.11 8860.99 8779.03 5948019.88 606966.29 5243.69 0.00 0.00 MWD
16500,00 89.98 302,11 8861.02 8779.06 5948071.76 606880.81 5328,39 0.00 0.00 MWD
16512.61 89.98 302.11 8861.03 8779.07 5948078.30 606870.03 5339.08 0.00 0.00 MWD
16550.00 88,32 303.62 8861.58 8779.62 5948098.11 606838,34 5370.47 6,00 137.64 MWD
16600.00 86.11 305.65 8864.01 8782.05 5948125.87 606796.84 5411.56 6,00 137.61 MWD
~
Sperry-Sun - Draft Copy
Sperry-Sun
Company: BP Amoco Date: 4/8/2004 Time: 16:54:55 Page: 4
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: W-09, True North
Site: PB W Pad Vertical (fVD) Reference: 81.96' 82.0
Well: W-09 Section (VS) Reference: Well (0.00N,0.00E,270,OOAzi)
Wellpath: Plan W-09A Deep KlO Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD Sys TVD MapN MapE VS DLS TFO Tool Comment
ft des deg ft ft ft ft ft deg/100ft deg
16650.00 83.90 307.68 8868.37 8786.41 5948155.01 606756.45 5451.51 6.00 137.51 MWD
16700,00 81.70 309.74 8874.64 8792.68 5948185.44 606717.29 5490.22 6.00 137.34 MWD
16750.00 79.51 311.82 8882.80 8800.84 5948217.09 606679.46 5527.57 6.00 137.08 MWD
16761,57 79.00 312.30 8884.96 8803.00 5948224.58 606670.91 5536.01 6.00 136.74 W-09A T44 W-09A n
16784.35 77.64 312.39 8889.57 8807.61 5948239.36 606654.20 5552.50 6.00 176.49 MWD
16786.16 77.64 312.39 8889,96 8808.00 5948240.53 606652.88 5553.81 0.00 0.00 W-09A Poly W-09A PJ
16800,00 77.64 312.39 8892.92 8810.96 5948249.49 606642.76 5563.79 0.00 0.00 MWD
16900,00 77.64 312.39 8914.33 8832.37 5948314.25 606569.64 5635.94 0.00 0.00 MWD
17000,00 77.64 312.39 8935.75 8853.79 5948379.01 606496.53 5708,09 0.00 0.00 MWD
17100.00 77.64 312.39 8957.16 8875.20 5948443.77 606423,41 5780.24 0.00 0.00 MWD
17200.00 77.64 312.39 8978.57 8896.61 5948508.53 606350.29 5852.39 0.00 0.00 MWD
17300.00 77.64 312.39 8999.98 8918,02 5948573.29 606277.18 5924.54 0.00 0.00 MWD
17400.00 77.64 312.39 9021.40 8939.44 5948638.05 606204.06 5996,68 0.00 0.00 MWD
17448.00 77.64 312.39 9031.67 8949.71 5948669.13 606168.97 6031.32 0.00 0.00 31/2" 3 1/2"
17449.34 77.64 312.39 9031.96 8950.00 5948670.00 606167.99 6032,28 0.00 0.00 W-09A T5 T W-09A T5
.
,
',"""""
THE MATERIAL 1JNDER THIS COVER HAS BEEN
MI CR 0 FILMED
ON OR BEFORE
OCTOBER 24~ 2000
C:LOR1\MflLM.DOC
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 21 September 1995
RE: Transmittal of Data
Sent by: HAND CARRY
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
Q-03 (ii-i5-1i-i3) .
DESCRIPTION
. .
PLS FINAL BL+RF
1 PLS FINAL BL+RF
1 GR/CCL FINAL BL+RF
1 PLS FINAL BL+RF
ECC No.
Run # 1 3861.03
Run ~ 1 4639.03
Run ~ 1 6081.02
Run # 1
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Or FAX to (907) 563-7803
Received by: / / ~ /~f__~ Date
// /,-:.,
Please sign and retitrn
Pe~rotechnical Da~a Cen~e~
BP Exploration (Alaska)
900 East Benmon Bouleva~
Anchorage, Alaska 99508
Received b~r " · '
STATE OF ALASKA
AL~oKA OIL AND GAS CONSERVATION COMMIS~t..N
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate X Plugging
Pull tubing Alter casing Repair well
Perforate X '"~
Other
6. Datum elevation (DF or KB~_~.~,
KBE = 90.66 AMS~'f~et
2. Name of Operator
BP Exploration (Alaska)/nc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1437' SNL, 1194' WEL, SEC. 21, T11N, R12E, UPM
At top of productive interval
1250'SNL, 94'EWL, SEC. 33, T11N, R12E, UPM
At effective depth
1489'SNL, 166' WEL, SEC. 32, T11N, R12E, UPM
At total depth
1559' SNL, 242' WEL, SEC. 32, T11N, R12E, UPM
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
W-09 (41-32-11-12) PBU
9. Permit number/approval number
89-54/
10. APl number
50- 029-21947
11. Field/Pool
12. Present well condition summary
Total depth: measured
15430feet Plugs (measured)
Effective depth:
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
true vertical
measured
true vertical
Length
..
110
3227
14601
measured
BKB 9199feet
15306feet Junk (measured)
BKB 9129feet
Size Cemented
20
13 3/8 4500 c.f.
9 5/8 3212 c.f.
Measured depth
147
3264
14638
__
1069 5 1/2 536 c.f. 14359-15428
15044'-15084~ 15094'-15154'
Prudhoe Oil Pool
True vertical depth
BKB
147
2631
8753
8596-9198
true vertical subsea
8892'- 8953' (two intervals)
Tubing (size, grade, and measured depth) 3 1/2" L-80 to 14279' with 3 1/2" tailpipe to 14370'
Packers and SSSV (type and measured depth) 9 5/8" TIW "HBBP" packer at 14279'; 3 1/2" SSSV at 2117'
(Two external casing packers at 14948' and 15163')
13. Stimulation or cement squeeze summary see attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Averaae Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
1350 2059 152 1685
4000 8679 510 1113
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil X Gas Suspended
17. I hereby cgrtify tha!.the forego, jqg is true and correct to the best of my knowledge.
Signed ?~%"¢q. Z,~ CV~.Z,(2 Title Senior Technical Assistant I
Form 10-40-4 ~R~v 06/157~88 7-"
RECEIV JD
1 5 199
..xla~k~ !m z, t;a.~ Cons.
Anchorage
Tubing Pressure
247
311
So,ice
SUBMIT IN D~PLI6ATE
WELL W-09(4..1-32-11-12)
AddPerf/Frac
The following additional interval were perforated on 7/14/91 using
3 3/8 guns with 4 spf, random orientation and 120° phasing.
14982' - 14996' MD
15000'- 15036' MD
The following additional interval were perforated on 7/18/91 using
3 3/8 guns with 4 spf, random orientation and 90° phasing.
14906' - 14948' MD
Performed hydraulic fracture on 9/29/91 pumped a total of
202,660# (59800#20/40,141,060# 16/20 behind pipe) Sand left in
casing 1,800#, Sand behind pipe 200,860#
FLUIDS:
72 bbl 15% HCL 281 bbl 20# Gel
429 bbl 50# XL Gel 984 bbl 50# XL Gel
221 bbl 20# Gel
10/10/92
fjh
RECEIVED
~AR 1 ~ 1993
Alaska 011 & Gas Cons. Comrniss[Or~
Anchorage
BP EXPLORATION
BP Exoloral~on (Alaska) Inc.
900 F_as[ Renson 8ou,evard
P.O. Box 196612
Anct~orage. Alaska 99519-6612
(90~ 56~-5~
DATE: 10/24/91
T~ 82948
BP CASED HOLE FINALS
~!osed is your coov of the materials listed
questions, please contact BP Well Records at
below. If you have any
(907) 564-4004.
::' : J-i3 -
CL 09/22/91
CCL 10/05/91
CL 08/22/91
CCL 09/2~/91
CCL 10/01/91
CCL 09/25/91
CCL 09/2!/91
GAS LiFT SURVEY 08/30/91
PROD-F 10/04/91
INJ 09/01/91
PROD-F 09/24/' 91
GAS ' LIFT: suRVEy:~T:09/22/9i
TEMP 10/05/91
LEAK DET 09/29/91
PITS 09/22/91
LEAK DET 10/04/91
GAS LIFT SURVEY 09/26/91
LEAK DET 09/27/91
SPINNER 10/02/91
SPINNER 10/03/91
INJ 09/30/91
iNJ 10/01/91
INJ 10/07/91
ZNJ i0/06/9i
TEMP 10/07/91
iNJ 10/06/91
PiTS 09/27/91
iNj 09/28 / 9i
iNJ 10/01/91
CCL 10/02/91
LEAK DET 10/03/91
JEWELRY
5 "
GAS ENTRY, JEWELRY
5 "
9047.00-10650.00
i395V.O0-l~5i£.00
12101.00-13175.00
9070.00- 9621.00
8869.00-10162.00
8780.00- 9331.00
14200.00-14987.00
1800.00- 4550.00
9000.00- 9405.00
CAMCO 5 "
C~CO 5 "
CAMCO 5 "
CAMCO 5 "
CA.MC 0 ~ ~"
CAMCO 5 "
CAMCO 5 "
CAMCO 2 / 5"
CAMCO 5 "
10470.00-10900.00 CAMCO 5 "
10900.00-11290.00 CP~iCO 5 "
~1-/;2' '.~..~375;00-11191:-00..CAMCO-.?...~2/5-.. _ ...........
#I 8800.00- 9812.00 CAMCO 5 "
#i 7400.00- 7600.00 CAMCO 5 "
~! 9100.00- 9547.00 CAMCO 5 "
#! '9770.00-10150.00 CAMCO 5 "
#' 100.00- 8550.00 CAMCO 2 "
~' 170.00-i1350.00 CAMCO 2 "
#1 9000.00- 9230.00 CAMCO 5 "
#' 12500.00-13125.00 CAMCO 5 "
#! 9150.00- 9520.00 CAMCO 5 "
=.=' 9050.00- 9385.00 CAMCO 5 "
#i 9650.00-10078.00 CAMCO 5 "
~' 9050.00- 9400.00 CAMCO 5 "
#i 8300.00- 9116.00 CAMCO 5 "
~l 9100.00- 9420.00 CA~CO 5. "
=' 94~n.~.00- 97~4~ .00 C~4CO 5 "
=' 12000.00-!2650.00 ,:i~4CC. 5 "
=' 10750.00-11297.00 C~MCO 5 "
=£ 8996.00-11779.00 CAMCO 5 "
#' 9350.00- 9650.00 CAMCO 5 "
08,,"30/91 #1 10800.00-11150,00~EAMCO
36/91
0029.00-ii649. S0
'~60,3~.,, .00-14545. .O0 C~4CO
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
RECEIVED
OCT 18 1991
Alaska 0il & Gas Cons. Commission
Anchorage
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below.
If you have any questions, please contact BP Well
Records at (907) 564-4004. .
DATE: 10/10/91
T~ 82910
~,%H_t6.~~G PITS 09/20/91 #1 10860.00
B-22~ PITS 09/07/91 #1 10800.00
Y,30~'''~ CCL 09/16/91 #1 8650.000
Y-2'9~''' CCL 09/16/91 #1 10131.00
%3-3~jN-t9~ CCL 09/25/91 #1 9000.000
~-~W-38'/ GAS LIFT SURVEY 09/15/91 fl 200.0000
~Z-/T&B-21uw PROD-F 08/13/91 ~1 9550.000
Y~26--- GAS LIFT SURVEY 09/16/91 #1 5400.000
X-26w'' INJ 09/24/91 ~1 9150.000
~~-05~ CL 09/07/91 ~1 9100.000
~9-~2_K-06,/ INJ 09/11/91 ~1 9800.000
K~02Au/ PROD-F 08/24/91 ~1 11000.00
W_09~/' GR 09/11/91 fl 14200.00
?~-&3$E--03/ PROD-F 09/25/91 ~1 12450.00
W-16~/ LEAK DET 09/19/91%1 2000.000
~-~'I~-R-22~'/ PROD-F 08/20/91 #1 10350.00
B-32u/z TEMP 09/15/91 #1 10275.00
C-04~ PROD-F 08/24/91 ~1 10350.00
?[,-~71G-26~ CL 09/04/91 ~1 10200.00
~9.~B-20J LEAK DET 08/23/91 #1 7992.000
~O-I;-~P-20 / LEAK DET 08/23/91 #1 11800.00
R-04J, GAS LIFT SURVEY 09/04/91 ~1 3200.000
r~-18~ PROD-F 09/25/91 ~1 9250.000
W-37J PROD-F 09/15/91 #1 9800.000
Y~'{~S-0'5v/ CL 09/15/91 #1 9500.000
¥~-~F-24~ TEMP 09/03/91 #1 11800.00
\~%M-16 ~ PROD-F 08/26/91 #1 10850.00
q,$~R-04J GAS LIFT SURVEY 08/26/91 #1 2500.000
B-32~ INJ 09/06/91 ~1 10240.00
~9, yOW-26J~ JEWELRY LOG 08/22/91 #1
CAMCO 5
W-il~ JEWELRY LOG 08/21/91 #1
CAMCO 5
G-0ZU
CAMCO 5
08/23/91
10900.
11444.00 CAMCO
11140.00 CAMCO
9240.000 CAMCO
12500.00 CAMCO
9755 . 000 CAMCO
4000.000 CAMCO
98~0.000 CAMCO
10986.00 CAMCO
9680.000 CAMCO
10941.00 CAMCO
10279.00 CAMCO
11480.00 CAMCO
15162.00 CAMCO
12685.00 CAMCO
11270 . 00 CAMCO
10720.00 CAMCO
10953.00 CAMCO
10660.00 CAMCO
10522.00 CAMCO
9062 . 000 CAMCO
12553.00 CAMCO
8639 . 000 CAMCO
9722 . 000 CAMCO
10100 . 00 CAMCO
10224.00 CAMCO
12175.00 CAMCO
11150.00 CAMCO
9821.000 CAMCO
10807.00 CAMCO
00 11758.00
12550.00
9950.000
13284.00
10120.00
5
5
5
5
5
2
5
5
5
5
5
5
5
5
2/5
5
5
5
5
5
5
5
5
5
5
5
5
2/5
5
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
PO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :07/26/91
T#:82667
FROM:
Information Control
Well Records LR2-1
SUBJECT: BP CASED HOLE FINALS
Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
c/~)~'"~ W-09 PFC 07/17/91 #1 14560-15050 Atlas 5"
W-39 CNL 07/17/91 #1 9200-9828 Atlas 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
BP EXPLORATION
BP Exploration (Alaska) Inc,
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date: 07/19/91
T#:82636
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP ~.A~ED HOLE FINAL,~
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
~ 1 -~ t P_06
S-12A
S-13
COLLAR 07/14/91 #1 9610-10340 ATLAS
COLLAR 07/15/91 #1 9680-9960 ATLAS
PFC 07/13/91 #1 10770-11136 ATLAS
PFC 07/I 4/91 #1 14584-15139 ATLAS
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
RECrclVED
JUL 2 3 1991
'Alaska Oil & Gas Cons. commission
AnCbO~'age
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate Plugging Perforate ..
Pull tubing X Alter casing Repair well .. Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1437' SNL, 1194' WEL, SEC. 21, T11N, R12E, UPM
At top of productive interval
1250' SNL, 94' EWL, SEC. 33, T11N, R12E, UPM
At effective depth
1489' SNL, 166' WEL, SEC. 32, T11N, R12E, UPM
At total depth
1559' SNL, 242' WEL, SEC. 32, T11N, R12E, UPM
12. Present well condition summary
Total depth:
Effective depth:
5. Type of Well:
Development -~L
Exploratory ~
Stratigraphic ~
Service
6. Datum elevation (DF or KB)
KBE = 90.66 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
W-09 (41-32-11-12) PBU
9. Permit number/approval number
89-54 / none
10. APl number
50- 029-21947
11. Field/Pool
measured
true vertical
measured
true vertical
15430 feet Plugs (measured)
9199feet BKB
15306feet Junk (measured)
9129feet BKB
Prudhoe Oil Pool
Casing Length Size Cemented Measured depth
Structural --
Conductor 110 20 147
True vertical depth
BKB
147
Sudace 3227 13 3/8 4500 c.f. 3264
2631
Intermediate 14601 9 5/8 3212 c.f. 14638
8753
Production
Liner 1069 5 1/2 536 c.f. 14359-15428
8596-9198
Perforation depth: measured 15044'- 15084', 15094'- 15154'
true vertical subsea
8892' - 8953' (two intervals)
Tubing (size, grade, and measured depth) 4-1/2" 12.6lt L-80 with TIW Seal Stem to 14369'.
Packers and SSSV (type and measured depth)
9-5/8" Baker ~rmanent packer ~ 14281', 4 Ira" SSSV at ~
(Two external msi~ packem at 14~7' and 151~
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Reoresentative Daily Average Production or In!ev--'tion Data
OiI-Bbl Gas-Md Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation
Subsequent to operation
1170 1193 84 0
1732 2066 112 1467
261
283
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations X
16. Status of well classification as:
Oil X Gas ...... Suspended., .
Service
17. I hereby certify that the foregoi~.cj is true and (:x:)rrect to the best of my knowledge.
Form 10-404 Rev 06/15/88 ~"
Date ~/~/~/
SUBMIT IN DUPLICATE
Well W-09 Workover:
Attachment I
Accepted rig at 2100 hours on 10/30/90. RIH with chemical cutter to
12,072' and cut tubing. ND tree and NU BOP's. Pulled 3-1/2" tubing.
Recovered 9-5/8" packer and tailpipe assembly. RIH with 4-3/4" bit and
5-1/2" scraper to 15,111'. RIH and mill junk to PBTD at 15,300'.
Displaced hole to filtered inhibited brine. Tested 9-5/8" casing and 7"
liner lap to 3000 psi. Polished tieback sleeve. Ran 4-1/2" tubing, spaced
out and landed. ND BOP. Nippled up tree. Set packer with 3000 psi,
OK. Tested annulus with 2500 psi. Set BPV. Released rig at 2100 hours
on 11/11/90. 12.0 Days.
BP EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT: PRUDHOI$ BAY UNIT
As of 0600 Hrs. Wednesday. October 17. 1990
WELL: W-2I (23-15-11-12) Rig:
Doyon Rig #16
Day: 1
Expense AFE Number:
Expense AFE Amount =
145024
Current Field Costs -
Estimated Final Cost =
Current Operation: Pull and lay down 3-1/2" tubing.
Summa_n/of Last 24 Hours -
Accept rig at 1900 hours on 10/15/90. Kill well and circulate out diesel. Circulate to 8.6 ppg
seawater. ND tree, NU BOP's and test. RU WL and cut 3-1/2" tubing. Pull and lay down 3-1/2"
tubing.
Reviewed By:
BP
EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Thursday. October 18. 1990
WELL: W-21 (23-15-11-12) Rig'
Doyon Rig #16
Day: 2
Expense AFE Number:
Expense AFE Amount =
145024
Current Field Costs =
Estimated Final Cost =
.Current Operation: Washover packer.
Summary_ of Last 24 Hours -
Pull and lay down 3-1/2" tubing. RIH with ovemhot to latch of 9-5/8" packer, would not release,
POH. RIH with washover shoe to packer.
Reviewed By:
BP EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT:
As of 0600 Hrs. Fdday. October 19, 1990
WELL: W-21 (23-15-11-12)
PRUDHOE BAY UNIT
Rig' Doyon Rig #16
Day: ,3
Expense AFE Number: 145024 Current Field Costs =
Expense AFE Amount = Estimated Final Cost =
Current Operation: RIH with washover shoe.
Summary. of Last 24 Hours "
Washover 9-5/8" packer with mill. CBU. POH. Recovered latch assembly. RIH with spear, spear
into.packer. POH, recovered top of packer. RIH with new washover shoe.
Reviewed By:
BP EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Monday, October 22. 1990
WELL: W-21 (23-15-11-12) Rig:
Doyon Rig #16
Day: .6_
Expense AFE Number:
Expense AFE Amount =
145O24
Current Field Costs =
Estimated Final Cost =
Current Operation: RIH with drilipipe conveyed perforating guns.
Summary_ of Last 72 Hours
Washed over packer at 9750'. RIH with 4" spear and recovered packer at 9748'. RIH with 8-1/2" bit
and 9-5/8" scraper to liner top. RIH with 4-3/4" mill on 2-7/8" tubing and cleaned to 11,339'.
Changed well over to filtered brine. RIH with 5-1/2" R'I-rS packer and set at 9897'. Tested liner lap
and 9-5/8" casing to 3000 psi, ok.
Reviewed By: .~/~.
BP EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Tuesday,. October 23. 1990
WELL: W.21 (23-1~.11-12) Rig:
D(~yon Rig #16
Day: 7
Expense AFE Number:
Expense AFE Amount =
145024
current Field Costs =
Estimated Final Cost =
Current Operation: Cut 2-7/8" tubing and recover guns.
Summary of Last 24 Hours
.
RIH with drillpipe conveyed guns. RIH with gamma ray and logged guns into position. Shot
perforation interval 11,230' to 11,220' WLM. Release packer and POH. Packer stuck at 10,350'
DPM. RIH with jet cutter.
Reviewed By:
BP EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Wednesday. October 24. 1990
WELL: W-21 (23-15-11-12) Rig:
Doyon Rig #16
Day: 8
Expense AFE Number:
Expense AFE Amount =
145024
Current Field Costs =
Estimated Final Cost --
.Current Operation: RIH with overshot.
Summary of Last 24 Hours
Cut 2-7/8" tubing at 9974' WLM. POH with drillpipe and 2-7/8" cut-off. RIH with overshot.
Reviewed By' ~'.~.
BP EXPLORATION (ALASKA),
INC.
DAILY WORKOVER REPORT: pRUDHOE BAY UNIT
As of 0600 Hrs. Thursday. October 25. 1990
WELL: W-21 (2.3-15-11-12~ Rig:
Doyon Rig #16
Day: 9
Expense AFE Number:
Expense AFE Amount =
145024
Current Field Costs =
Estimated Final Cost =
Current Operation: Attempting to recover fish.
summary of Last 24 .Hours
RIH and attempted to recover 2-7/8" cutoff and drillpipe conveyed gun assembly. RIH with 3-1/2"
drill collars and 3-1/8" jars. Mill on tubing cut at 9995'. Latched onto cutoff and attempted to jar fish
loose.
Reviewed By: ~.~k.
BP EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT:
As of 0600 Hrs. Friday. October 26. 1990
WELL: W-21 (2~-15-11-12)
PRUDHOE BAY UNIT
Rig: Doyon Rig #16
Day: 1 0
Expense AFE Number: 145024 Current Field Costs =
Expense AFE Amount = Estimated Final Cost =
Current Operation: RIH with new tubing cutter.
Summary of Last 24 Hours
Attempted to recover fish. POH. RIH with overshot and latch onto fish. RIH with tubing cutter.
Cutter would not fire.
Reviewed By: ~.%.
BP EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Monday. October 29. 1990
WELL: W-21 (23-15-11-12) Rig:
DQyQn Rig #16
Day: .1 3
Expense AFE Number:
Expense AFE Amount =
145024
Current Field Costs -
Estimated Final Cost -
Current Operation: RIH with 3-1/2" tubing.
Summary_ of Last 72 Hours
RIH with tubing cutter and cut tubing above packer. Well began to flow. Weight up to 8.55 ppg to
stabilize well. POH and lay down 2-7/8" tubing. RIH with fishing tools. Milled over 2-7/8" cutoff at
10,329'. Attempted to recover fish. RIH with 8-1/2" tapered mill and polished liner top. RIH with
tie-back polishing mill and polished liner tie-back. Changed well over to filtered inhibited brine.
RIH with 3-1/2" completion string.
Reviewed By: 'I
BP EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Tuesday, October 30, 1990
WELL.: W-21 (23-15-11-12) Rig'
Doyon Rig//16
Day: .1 4
Expense AFE Number: 145024_
Expense AFE Amount =
Current Operation: Set plug'in tailpipe.
Summary_ of Last 24 Hours
Current Field Costs =
Estimated Final Cost --
RIH with tubing. Space out and land tubing. ND BOP's and NU tree. Test tree to 5000 psi, ok.
Pulled dummy SSSV. RIH with 3-1/2" plug and attempt to set in tailpipe.
Reviewed B,~~
BP EXPLORATION (ALASKA)', INC.
DAILY WORKOVER REPORT: PRLIDHOE BAY UNIT
As of 0600 Hrs. Wednesday, October 31, 1990
WELL: W-21 (23-15-11-12) Rig:
D0yon Rig #16
Day' 1 5
Expense AFE Number:
Expense AFE Amount =
145024
Current Field Costs =
Estimated Final Cost =
Current Operation: Move rig to W-09.
Summary_ of Last 24 Hours
Set plug in tailpipe assembly. Set packer and tested tubing, OK. Pressure tested annulus to 2500
psi. Test failed. Sheared RP valve and freeze protected well with 140 bbls of diesel. Installed BPV
and secured well. Released rig at 1900 hours on 10/30/90.
Reviewed By' ~.~.
BP EXPLORN'ION
Daily Drilling Report-- Prudhoe Bay Unit
May 30, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 2050'
Day: 3
72- Hour Ftg: 2050'
Current Operation:
Drilling.
Skidded rig from W-5 to W-9. Drilled 17-1/2" hole to 475'. Kick off at 475'. Drilled to
2050'.
Mud Type: SPUD
SURVEY MD
WT: 9.2 VIS: 115 PV: 20 YP: 39 FL: 15 Solids: 6 Temp: °F
ANGLE DIRECTION. TVD SECTION COORDINATES DLS
BP EXPLOR~N
Daily Drilling Report -- Prudhoe Bay Unit
May 31, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32~11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 3290'
Day: 4
24- Hour Ftg: 1240'
Current Operation:
POOH to mn 13-3/8".
Drilled 17-1/2" hole to 3290'.
Mud Type: SPUD
SURVEY MD,
WT: 9.8 VIS:96 PV:28
ANGLE. DIRECTION ,TVD
YP: 49 FL: 13.4
SECTION
Solids: 10 Temp: 64 °F
COORDINATES_ DLS
Bi~ EXPLOR/~ION
Daily Drilling Report-- Prudhoe Bay Unit
June 1, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 3254'
Day: 5
24- Hour Ftg: 0
Current Operation:
PU 12-1/4" BHA. '
Ran and cemented 13-3/8" casing. ND 20" riser. NU 13-5/8" head and BOP's.
Mud Type: SPUD
SURVEY MD
WT: 9.5 VIS: 35 PV: 8 YP: 2 FL: 14.8 Solids: 7 Temp:
ANGLE DIRE~'TION TVD SECTIQN COORDINATES
DLS
Daily Drilling Report -- Prudhoe Bay Unit
June 2, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 4545'
Day: 6
24- Hour Ftg: 1255'
Current Operation:
Drilling.
Drilled 12-1/4" hole to 4545'.
Mud Type: LSND
SURVEY MD
WT: 9.7 VIS: 37 PV: 13
ANGLE DIRECTION TVD
YP: 7 FL: 13.2
SECTION
Solids: 8 Temp: 63 °F
COORDINATES DLS
!~ EXlq. ORNION
Daily Drilling Report -- Prudhoe Bay Unit
June 5, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 8545'
Day: 9
48- Hour Ftg: 4000'
Current Operation:
Drilling.
Drilled 12-1/4" hole to 8545'.
Mud Type: LSND
SURVEY MD
WT: 9.7 VIS: 35 PV: 11
ANQLE DIREqTFIQN TVD
YP: 6 FL: 9.4
SECTION
Solids: 8 Temp: 78 °F
~OORDINATES DL$.
BP EXPLORN'ION
Daily Drilling Report -- Prudhoe Bay Unit
June 6, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 8744'
Day: 10
24- Hour Ftg: 199'
Current Operation:
Drilling with motor.
Drilled to 8598'. Trip for motor. Drilled 52' and motor failed. POOH. TIH with new
motor. Drilled to 8744'.
Mud Type: LSND
SURVEY .MD
WT: 9.8 VIS: 36 PV: 12 YP: 10 FL: 8.4 Solids: 9 Temp:
ANGLE DIRECTION. TVD SECTION COORDINATES
74°F
DLS.
BP EXFLOR.~'ION
Daily Drilling Report-- Prudhoe Bay Unit
June 7, 1989 at 0600 hfs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 9210'
Day: 11
24- Hour Ftg: 466'
Current Operation:
Drilling.
Drilled with motor to 8916'. LD motor. Drilled 12-1/4" hole to 9210'.
Mud Type: LSND
SURVEY MD
WT: 9.8 VIS: 35 PV: 9 YP: 8 FL: 6.8
ANGLE DIRECTIQN TVD SEQ'TION
Solids: 9 Temp: 90 ~F
COORDINATES, DLS
BP EXPLOR~N
Daily Drilling Report -- Prudhoe Bay Unit
June 8, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 9530'
Day: 12
24- Hour Ftg: 320'
Current Operation:'
Drilling.
RIH with new bit and continued drilling 12-1/4" hole to 9530'.
Mud Type: LSND
,SURVEY MD.
WT: 9.8 VIS: 38 PV: 12 YP: 9 FL: 6
ANGLE DIRECTION TVD SECTION
Solids: 9 Temp: 90 °F
,COORDINATES. DLS
BP EXPLOR.griON
Daily Drilling Report-- Prudhoe Bay Unit
June 9, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600Depth: 10384'
Day: 13
24- Hour Ftg: 854'
Current Operation:' Drilling.
Continued drilling 12-1/4" hole to 10384'.
Mud Type: LSND WT: 9.9 VIS: 39 PV: 12
SURVEY ,MD ANGLE. DIRECTION TVD.
YP: 10 FL: 5.8
$,ECTrON,
Solids: 10 Temp: 88 ~F
,CQORDINATE$ DLS
Sq'
BP EXPLORATION
Daily Drilling Report -- Prudhoe Bay Unit
June 12, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AYE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 12345'
Day: 16
72- Hour Ftg: 1961'
Current Operation:
Trip for bit.
Drilled 12-1/4" hole to 12345'.
Mud Type: LSND
SURVEY ,MD,
WT: 9.9 VIS: 39 PV: 11
ANGLE DIRECTION TVD
YP: 8 FL: 5.2
SECTION
Solids: 11 Temp: 89 °F
COORDINATES DLS
BP EXPlORATiON
Daily Drilling Report-- Prudhoe Bay Unit
June 13, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 12865'
Day' 17
24- HourFtg: 520'
Current Operation:
Drilling 12-1/4" hole.
Drilled 12-1/4" hole to 12865'.
Mud Type: :LSND
WT: 9.9 VIS: 37
ANGLE DIRECTION
PV:10
TVD
YP: 7FL: 5
SECTION
Solids: 11 Temp: 90 °F
COORDINATES,. DLS
BP EXPL,OR~N
Daily Drilling Report -- Prudhoe Bay Unit
June 14, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 13220'
Day: 18
24- Hour Ftg: 355'
Current Operation:' Drilling.
Drilled 12-1/4" hole to 13220'.
Mud Type: LSND WT: 9.9 VIS: 37 PV: 12
$,I./RVEy MD, ANGLE DIRECTION TVD
YP: 8 FL: 5.2
SECTION
Solids: 11 Temp: 94 °F
COORDINATES. DL$
BP EXPLORMION
Daily Drilling Report -- Prudhoe Bay Unit
June 15, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 13536'
Day: 19
24- Hour Ftg: 316'
Current Operation:
Testing BOP's.
Drilled 12-1/4" hole to 13536'. POH.
Mud Type: LSND
~IJRVEY MD,
WT: 9.9 VIS: 38 PV: 12
ANGLE DIRECTION .TVD
YP: 10 FL: 4.8
SECTION
Solids: 11 Temp: °F
COORDINATES DL$.
Daily Drilling Report -- Prudhoe Bay Unit
June 16, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
APl: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 1389'
Day: 20'
24- HourFtg: 283'
Current Operation:
Drilling 12-1/4" hole.
Drilled 12-1/4" hole to 13819'. POH and change BHA.
Mud Type: LIGNO WT: 9.9 VIS' 37 PV: 12
SURVEY MD ANGLE DIRE ,.~TIQN TVD
YP:9 FL: 4.6
SECTION
Solids: 11 Temp'
COORDINATES
oF
DLS
BP EXPI. OR~N
Daily Drilling Report -- Prudhoe Bay Unit
June 19, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 14640'
Day: 23
72- Hour Ftg: 821'
Current Operation:
Running 9-5/8" casing.
Drilled 12-1/4" hole to 14640'. Ran 9-5/8" casing.
Mud Type: LIGNO
SURVEY MD
WT: 10.0 VIS:38 PV: 13 YP:8 FL:5.0
ANGLE DIRECTION TVD ,SECTIO,N
Solids: 11 Temp: °F
COORDINATES DLS
BP EXPLOR,~ION
Daily Drilling Report-- Prudhoe Bay Unit
June 20, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
APE 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 14640'
Day: 24
24- Hour Ftg: 0
Current Operation:
TIH with 8-1/2" BHA.
Ran 9-5/8" casing to 14638'. Cement. Test BOP's. PU 8-1/2" BHA and TIH.
Mud Type: LIGNO
WT: 10.0 VIS:39 PV: 12 YP: 10 FL:5.4 Solids: 11 Temp: °F
ANGLE DIRE~QN .TVD SECTION COORDINATES DL$
BP EXPLOH~N
Daily Drilling Report -- Prudhoe Bay Unit
June 21, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 14910'
Day: 25
24- Hour Ftg: 270'
Current Operation:
Drilling 8-/12" hole.
Drilled the 8-1/2" hole to 14910'. Servicing the top drive wiring.
Mud Type: LIGNO
SURVEY MD
WT: 9.8 VIS: 35 PV: 9 YP: 7 FL: 7
ANGLE DIRE~FION TVD SECTION,
Solids: 10 Temp: °F
COORDINATES DLS
BP EXPLOR~N
Daily Drilling Report -- Prudhoe Bay Unit
June 22, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
A.PI: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 15430'
Day: 26
24- Hour Ftg: 520'
Current Operation:
Circulate.
Drilled to 15430'. POOH.
Mud Type: LIGNO WT: 9.7
$~'RVEY MD ANGLE
VIS: 36 PV: 10 YP: 8 FL: 5
DIRECTION TVD SECTION
Solids: 10 Temp: °F
COQRDINATE$ DLS,
BP EXPLOR~N
Daily Drilling Report-- Prudhoe Bay Unit
June 23, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 15430'
Day: 27
24- Hour Ftg: 0
Current Operation:
Tripping.
Ran wireline electric logs. Made conditioning trip. POOH.
Mud Type: LIGNO
SURVEY MD,
WT: 9.7 VIS: 39 PV: 11
ANGLE DIRE~TIQN TvD
YP: 7 FL: 5.2
SE~IQN
Solids: 10 Temp: °F
COORDINATES DLS
BP EXPLORAI'iON
Rig: Audi 3
Well: W-9 (41-32-11-12)
Daily Drilling Report -- Prudhoe Bay Unit
June 26, 1989 at 0600 hrs
AFE # 120942
PPI: 50~02%21947
AFE Amount:
Current Amount:
Current Operation:
0600 Depth: 15430'
Day: 30
72- Hour Ftg: 0
Circulating.
Ran 5-1/2" liner and 2 CTC packers. Cemented. Till and dressed off liner top. Tested
lap to 3000 psi. Cleaned out cement to 15306'.
Mud Type:
SURVEY
WT: 9.3 VIS:44 PV: 16 YP: 7 FL: 12.4 Solids: 9 Temp: °F
ANGLE DIREL'TIQN TVD SECTION COORDINATES DL$
BP EXPLORN'iON
Daily Drilling Report -- Prudhoe Bay Unit
June 27, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 15430'
Day: 31
24- Hour Ftg: 0
Current Operation:
TIH with bit and scraper.
Test liner to 3000 psi. Polished tie back sleeve.
Mud Type: LIGNO
,~URVEY ~MD
WT: 9.3
ANGLE
VIS: 46 PV: 15
DIRE~'TION .TVD
YP: 6 FL: 12
SE~WION
Solids: 9 Temp: °F
COORDINATES DLS
BP EXPLOR.~ION
Rig: Audi 3
Well: W-9 (41-32-11-12)
Daily Drilling Report -- Prudhoe Bay Unit
June 28, 1989 at 0600 hrs
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 15430'
Day: 32
24- Hour Ftg: 0
Current Operation:
POH.
Displaced well with 9.3 ppg brine. Tested liner to 3000 psi. POH.
Mud Type: BRINE WT: 9.3
SURVEY MD ANGLE
VIS: PV: YP: FL:
DIRE~QN TVD SECTION
Solids: Temp: °F
COORDINATES DL,S
Daily Drilling Report -- Prudhoe Bay Unit
June 29, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 15306'
Day: 33
24- Hour Ftg: 0
Current Operation:
RU to perforate.
Ran CET/CBT and gyro. RIH with robing conveyed perforating guns. Set packer.
Mud Type: BRINE
SURVEY MD,
WT: 9.3 VIS: PV: YP: FL: Solids: Temp: °F
ANGLE DIREQ"FION TVD. SECTION COORDINATES DLS
BP EXPLOR~N
Daily Drilling Report-- Prudhoe Bay Unit
June 30, 1989 at 0600 hrs
Rig: Audi 3
Well: W-9 (41-32-11-12)
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
0600 Depth: 12306'
Day: 34
24- Hour Ftg: . 0
Current Operation: Laying down DP.
Perforated underbalance with DP conveyed guns. Produced fluid to surface. Reversed
out. Pulled guns.
Mud Type: BRINE WT: 9.3 VIS- PV: YP: FL: Solids: Temp: °F
SURVEY ,MI). ANGLE DIRE~FIQN TVD SE~WIQN COORDINATES DLS
BP EXPLOR.~'ION
Rig: Audi 3
Well: W-9 (41-32-11-12)
Daily Drilling Report -- Prudhoe Bay Unit
July 5, 1989 at 0600 hrs
AFE # 120942
API: 50-029-21947
AFE Amount:
Current Amount:
Current Operation:
0600 Depth: 15306'
Day: 36
48 - Hour Ftg: 0
Release rig.
Run 3-1/2" robing, set and test packer. Displaced brine with 45 bbls. diesel.
Mud Type: BRINE WT: 9.3
SURVEY MD ANQLE
VIS: PV: YP: FL:
DIRECTION TVD SECTION
Solids: Temp: °F
COORDINATES DL$
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :11/06/90
T#:81782
FROM'
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINAL~;
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
G-17 COLLAR 10/31/90 #1 9790-10060 ATLAS 5"
W-09 TUBING CU'i-I-ER 10/31-90 #1 11995-12108 ATLAS 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
RECEIVED
NOV 1 4 1990
Alaska 011 & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
January 29, 1990
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well W-9 (41-32-11-12) PBU
Gent lemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of stimulating the well.
Yours very truly,
JAB: JAM
Enclosures (4)
cc: L. Burke (MB12-1)
Well Records (LR2-1) w/10
Well File
RECEIVED
.. .
..'-'~, STATE OF ALASKA ~
,SKA OIL AND GAS CONSERVATION COM~, .,ION [~
REPORT OF SUNDRY WELL OPERATIONS
Stimulate X Plugging
Alter casing Repair well
5. Type of Well:
Development ~
Exploratory
Stratigraphic
Service
1. Operations performed: Operation shutdown
Pull tubing
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
Perforate
Other
4. Location of well at surface
1437' SNL, 1194' WEL, SEC. 21, T11N, R12E, UPM
At top of productive interval
1250' SNL, 94' EWL, SEC. 33, T11N, R12E, UPM
At effective depth
1489' SNL, 166' WEL, SEC. 32, T11N, R12E, UPM
At total depth
1559' SNL, 242' WEL, SEC. 32, T11N, R12E, UPM
12. Present well condition summary
Total depth: measured 15430feet
true vertical BKB 9199feet
Plugs (measured)
6. Datum elevation (DF or KB)
KBE = 90.66 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
W-09 (41.32-11-12) PBU
9. Permit number/approval number
89-54 / 9-963
10. APl number
50- 029-21947
11. Field/Pool
Prudhoe Oil Pool
Effective depth: measured 15306feet
true vertical BKB 9129feet
Junk (measured)
Casing Length Size
Structural --
Conductor 110 20
Surface 3227 13 3/8
Intermediate 14601 9 5/8
Production --
Liner 1069 5 1/2 536 c.f.
Perforation depth: measured 15044'- 15084', 15094'- 15154'
Cemented Measured depth True vertical depth
BKB
147 147
4500 c.f. 3264 2631
3212 c.f. 14638 8753
14359-15428 8596-9198
true vertical subsea
8892'- 8953' (two intervals)
Tubing (size, grade, and measured depth) 3 1/2" L-80 to 14279' with 3 1/2" tailpipe to 14370'
Packers and SSSV (type and measured depth) 9 5/8" TIW "HBBP" packer at 14279'; 3 1/2" SSSV at 2117' (Two external casing packers at 14948' and 15163')
13. Stimulation or cement squeeze summary see attachment
Intervals treated (measured)
14.
Treatment description including volumes used and final pressure
Rel~resentative Daily Average Production or Injection Data
OiI-Bbl Gas-Md Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation
Subsequent to operation
445 190 234 0 223
1770 1887 0 1088 276
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations X Oil X Gas Suspended Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~;~~ ~~ Title Manager Production Engineering
Form ~4'Re'v~06/15/88 ~'~'
SUBMIT IN DUPLIC~IE
?
WELL W-9 (41.32.11-12} PBU
~TIMI, ILATION OPERATIONS
A HCI breakdown treatment and mud acid matrix treatment was performed January 13, 1990,
on the following perforated intervals in Well W-9.
15044'- 15084' MD BKB
15094'- 15154' MD BKB
Prior to the breakdown job a 36-bbl. 15% HCI/xylene tubing wash was bullheaded January 1,
1990. The breakdown was pumped as follows:
a)
b)
c)
d)
24 bbls. Arctic diesel preflush
12 bbls. 10% HCI
196 bbls. 10% HCI w/400 7/8" 1.1 SG ballsealers dropped evenly
throughout the fluid
143 bbls. 2% NH4CI brine
The well was surged twice to knock the balls off the perforations.
The mud acid matrix treatment was pumped as follows:
a)
b)
c)
d)
e)
f)
g)
h)
i)
J)
k)
24 bbls. 6% HCI/1.5% HF
6 bbls. OSR diverter
48 bbls. 6% HCI/1.5% HF
6 bbls. OSR diverter
142 bbls. 6% HCI/1.5% HF
17 bbls. diesel
2236 bbls. 2% NH4CI brine
48 bbls. Arctic diesel overflush
24 bbls. xylene
11 bbls. diesel
111 bbls. dead crude
The well was returned to production slowly, then tested.
jam
1/18/90
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
October 30, 1989
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well W-9 (41-32-11-12) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our proposal
to stimulate the well.
Yours very truly,
A Brag~~
~~oduct ion Engineering
JAM: JAM
Enclosures (6)
cc: L. Burke (MB12-1)
Well File
RECEIVED
Alaska Oil & Gas Cons. Commissior~
' Anchora§',~
STATE OF ALASKA
AL. .~KA OIL AND GAS CONSERVATION COMMIt:,...oN~! ~,I
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon Suspend
Alter casing ~ Repair well~
Change approved program
2, Name of Operator
BP Exploration (Alaska) Inc.
3, Address
P. O. Box 196612, Anchorage, Alaska 99519.6612
4. Location of 'well at SUrface
1437' SNL, 1194' WEL, SEC. 21, T11N, R12E, UPM
At top of productive interval
1250' SNL, 94' EWL, SEC. 33, TI 1N, R12E, UPM
At effective depth
1489' SNL, 166' WEL, SEC. 32, T11N, R12E, UPM
At total depth
1559' SNL, 242' WEL, SEC. 32, T11N, R12E, UPM
12. Present well condition summary
Total depth: measured 15430 feet
true vertical BKB 9199 feet
Operation Shutdown
Plugging Time extension
Pull tubing ~ Variance ~ Perforate ~
5. Type of Well: 6.
Development X
Exploratory
Stratigraphic.~ 7.
Service
Re-enter suspended well
Stimulate X
Other
Datum elevation (DF or KB)
KBE , 90.66 AMSL feet
Unit or Property name
Prudhoe Bay Unit
8. Well number
W-09 (41-32-11-12) PBU
9. Permit number
89-54
10. APl number
50- 029-21947
11. Field/Pool
Prudhoe Oil Pool
Plugs (measured)
Effective depth: measured 15306 feet
true vertical BKB 9129 feet
Junk (measured)
Casing Length Size
Structural --
Conductor 110 20
Surface 3227 13 3/8
Intermediate 14601 9 5/8
Production --
Liner 1069 5 1/2 536 c.f.
Perforation depth: measured 15044'. 15084', 15094'- 15154'
Cemented Measured depth True vertical depth
BKB
147 147
4500 c.f. 3264 2631
3212 c.f. 14638 8753
14359-15428 8596-9198
true vertical subsea
8892'- 8953' (two intervals)
RECEIVE[
Tubing (size, grade, and measured depth) 3 1/2" L-80 to 14279' with 3 1/2" tailpipe to 14370'
Packers and SSSV (type and measured depth) 9 5/8" TIW "HBBP"packer at 14279'; 3 1/2" SSS Vat 2117~.Jaska 0ii & Gas C0ns. Cor[1
(Two external casing packers at 14948' and 15163') Anchnmr..~:
13. Attachments Description summary of proposal x Detailed operations program ~ BOP sketch
14. Estimated date for commencing operation I 15. Status of well classification as:
November 1989
16. If proposal was verbally approved Oil X Gas ~ Suspended
Name of approver Date approved Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed (:~4~/~ ~,~~,,..~I.~ Title Manac~ler Production En~lineerin~l Date/~) ~0. ~, [
// c/f/ FOR COMMISSION USE ONLY
Condj~:~ns of approval: Notify Commission so representative may witness I Approval No. c~ .- ~'~ '~
Plug integrity BOP Test Location clearance .I -
Mechanical Int-~:'grity Test_~ '-~"ubsequent form required i~- ~'-/ _.n~e6 C,.o[:)'Y ._
Approved by orderofthe Commission David W. Johnston C~r Date // cY
Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE
issr0'
WELL W-9 ¢41.32-11.12~ PBU
STIMULATION PROPOSAL
A HC1 breakdown treatment and mud acid matrix treatment are proposed for the
following perforated intervals in Well W-9.
15044' - 15084' MD BKB
15094' - 15154' MD BKB
Prior to the breakdown job a bullheaded HC1/xylene tubing wash will be performed.
The breakdown will be performed as follows:
a)
b)
c)
d)
1000 gal. Arctic diesel preflush
500 gal. 10% HC1
4500 gal. 10% HC1 w/400 7/8" 1.1 SG ballsealers dropped evenly
throughout the fluid
6000 gal. 2% NH4CI brine
The well will be surged three times to knock the balls off the perforations.
The mud acid matrix treatment will be pumped as follows:
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
m)
1000 gal. 6% HC1/1.5% HF
250 gal. OSR diverter
2000 gal. 6% HC1/1.5% HF
250 gal. OSR diverter
4000 gal. 6% HCI/1.5% HF
250 gal. OSR diverter
8000 gal. 6% HCI/1.5% HF
10,000 gal. 2% NH4CI brine
2000 gal. Arctic diesel overflush
1000 gal. xylene
1000 gal. diesel
120 bbls. dead crude
The well will be returned to production slowly, then tested.
jm
10125189
Gas Cons,, Gom~ssiot~
BP EXPLORATION
BP Exl31oration (Alaska) Inc.
900 East Benson Boulevard
PO. Box 196612
Anct~orage, Alaska 99519-6612
(907) 561-5111
To: Distribution Date: 10/05/89
Transmittal: 80453
From:
Information Control
Well Records LR2-1
Subject: BP CASED HOLE FINAL LOGS
Enclosed is your copy of the material listed below. If you have any
questions, please contact BP Well Records at (907) 564-4445.
R-02 INJ 09/22/89 91 9200-9900 Camco 5"
R-07 INJ/TEMP 09/20/89 91 9650-10399 Camco
S-02~ GAS LIFT 09/21/89 #1 100-11127 Camco 5"
U-10 INJ 09/23,/89 91 9650-10060 Camco 5"
W-09 PROD-F 09/22/89 ~1 14200-15306 Camco 5"
X-04 GAS LIFT 08/23/89 91 2500-10053 Camco 1"/5'
X-ll INJ 09/20/89 91 9050-9450 Camco 5"
X-li INJ 09/20/89 91 9050-9450 Camco 5'
X-19 GAS LIFT 09/21/89 91 100-10027 Camco 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
HOUSTON
MOBIL
PHILLIPS
RESERVOIR
ARCHIVES
0il & l as Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage. AlasKa 99519-6612
(9O7) 561-5111
TO:
HOUSTON
ARCO
CHEVRON
EXXON
TEXACO
MOBIL
PHILLIPS
ARCHIVES
DATE: 09/20/89
TS: 80377
BP FINAL DATA - PRESSURE SURVEY DATA
Enclosed is your copy of the material listed below. If you have any
questions, please contact BP Well Records at (907) 564-4445.
F-32 Static Gradient 09/11/89 Camco
R-12 Flowing Gradient 08/21/89 Camco
S-03 Flowing Gradient 09/12/89 Camco
T-01 Static Gradient 09/05/89 Camco
W-04 Flowing Gradient 08/26/89 Camco
W-09 Static Gradient 09/05/89 Camco
W-40 Static Gradient 09/08/89 Camco
X-12 Flowing Gradient 08/31/89 Camco
Y-01 Flowing Gradient 08/30/89 Camco
Information Control
Well Records LR 2-1
J. Dietz/S. McCurry
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage. Alaska 99519-6612
(907) 561.5111
TO:
HOUSTON
ARCO
CHEVRON
EXXON
MOBIL
PHILLIPS
STATE OFiALASKA
GEOSCIENCES
DATE: 24-JUL-89
T#: 80198
ARCHIVES
BP OPEN HOLE FINAL LOGS
The following material ie being submitted herewith. Please acknowledge
receipt by siging a copy of this letter and returing it to this office:
HOU/UNIT/STATE:
W-09 EWR 22-JUN-89 #1 14635-15428 SPERRY 2"/5"
W-09 CNL PORO 22-JUN-89 91 14635-15428 SPERRY 5"
STATE ONLY:
Magnetic Single Shot Directional Survey Date:
Gyroscopic Directional Survey Date:
Received: "'-~,~
Date:
DIRECTIONAL SURVEYS
Job#:
Job#:
Information Control
Well Records LR 2-1
J. Dietz/S. McCurry
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: HOUSTON DATE: 07-10-89
ARCO T9: 80151
CHEVRON
EXXON
MOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
ARCHIVES
BP OPEN HOLE FINAL LOGS
The following material ie being submitted herewith. Please acknowledge
receipt by siging a copy of this letter and returing it to this office:
HOU/UNIT/STATE:
W-09 DIL 06-22-89 #1 14628-15428 Sch 2"/5"
W-09 BHC 06-22-89 #1 14628-15397 Sch 2"/5"
W-09 SSTVD 06-22-89 #1 14628-15428 Sch 1"/2"
W-09 CNL 06-22-89 #1 11300-15339 Sch 5"
Received:
Date:
STATE ONLY: DIRECTIONAL SURVEYS
Magnetic Single Shot Directional Survey Date: Jobg:
Gyroscopic Directional Survey Date: Jobg:
i~ .' ~"': '~ J Dietz/S McCurry
,..
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
August 18, 1989
Alaska Oil & Gas Conservation Commission
3001 Porcupine Dr.
Anchorage, Alaska 99501
Attn' Mr. C. V. Chatterton
Well W-09 (41-32-11-12) PBU
Enclosed, in duplicate, is form 10-407, our Report of Well
Completion for the above named well. This information
reflects the current condition and status of the well. Also
enclosed are two copies each of daily drilling reports,
directional and gyroscopic surveys, and open hole logs.
Yours very ,truly,
~. G. Vidrine
Drilling Engineering
Supervisor
JGV/KTH
Enclosures (4)
J. Martin (MB 9-4)
Well Records w/10
Well File
, 2 ~'~"~' STATE OF ALASKA -"~-'" 0 ~ [ ~ ~N J~ L
- AI.~S~ OIL AND GAS CONSERVATIOI~ ~OMMISSION
' WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE D
1'2. Name of Operator 7. Permit Number
BP Exploration 89-54
3. Address 3. APl Number
P. O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-21947
4. Location of well at surface [OCATtON~- - 9. Unit or Lease Name
1437' SNL, 1194' WEL, SEC. 21, T11N, R12E VERl~rn Prudhoe Bay Unit
At Top Producing Interval ,'~)' 10. Well Number
1252' SNL, 5186' WEL, SEC. 33, T11N, R12E 11. Field and Pool
At Total Depth .... _
Prudhoe Bay Field/Prudhoe Bay Pool
1560' SNL, 243' WEL, SEC. 32, T11N, R12E
5. Elevation in feet (indicate KB, DF, etc.) J6. Lease Designation and Serial No.
KBE = 90.66' I ADL 47453
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. 'No. 'of Completions
5/27/89 6/21/89 7/1/89I N/A feet MSL J One
17.'"Tota'l Depth (MD+TVD) 18. Plug Back Depth (MD+TVD', 19. Directional Survey J20. Depth where SSSV set J21. Thickness of Permafrost
15430' MD / 9199' TVD 15306' MD / 9129' TVD YES [] NO []I 2117feet MD 12067'
22. Type Electric or Other Logs Run
DIL/BHC/CNL/GR
................
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" Conductor Surface 110'
13-3/8" 68# L-80 Surface 3264' 17-1/2" 4500 cufl Cold Set II
9-5/8" 47# NT80S Surface 14638' 12-1/4" 3212 cu ft Class G
5-1/2" 17# L-80 14359' 15428' 8-1/2" 536 cuft Class G
2~t.'" Periorations open to Production (MD+TVD of Top a~d Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
Schlumberger 3-3/8" @ 2 spf 3-1/2" 9.2# L-80 14,370' 14,279'
MD TVDss (2) external casing packers ~ 14,948' & 15,163'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
15,044'- 15,084' 8,892'- 8,914' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
15,094'- 15,154' 8,920'- 8,953' 13-3/8"X 9-5/8" Arctic Pack Annulus with 200 BBLS
Dry Crude.
,,
27. PRODUCTION TEST
Date First 'Production IMethod of Operation (Flowing, gas lift, etc.)
June 29, 1989 J Flowing
Date of' Te~t Hours Tested PRODUCTION FOR ~)IL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO
TEST PERIOD I~
I
Flow Tubing Casing Pressure CALCULATED DIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE I~
_~8. CORE DATA
,
Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips.
.,
·
,
Form 10-407 Submit in duplicate
Rev. 7-1-80 :: ! '~ CONTINUED ON REVERSE SIDE
29. 30.
GEOLOGIC MARKERS FOR~,,ATION TESTS
-,
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
SAG 14639' 8754'
SHUBLIK A 14675' 8774'
ZONE 4 14879' 8889'
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed (~~~J~ TitleDr, ll, noEnclin,er, nclSuD,rvisor Date
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
~1 TELECDI Teleco Oiifield Se ; of Alaska Inc.
61 16 Nielson Way
Anchorage, AK
99502
(907) 562-2646
June 21, 1989
JOB #701
BP EXPLORATION (ALASKA) INC.
WELL: W-9
PRUDHOE BAY
RIG: AUD # 3
Attached please find a copy of the computer calculated MWD
directional surveys for the above mentioned well.
Teleco appreciates this opportunity to provide service to BP
Exploration (Alaska) Inc.
Teleco is committed to providing the highest quality MWD Service
and we would welcome any comments or questions concerning these
surveys or any of our other services.
Sincerely,
Jonathan
Field Operations Supervisor
JGM/el
Enclosures
A .~4¢,A~1/~? COMPANY
TELECO OILFIELD SERVICES
SURVEY CALCULATIONS
Date 06/19/89
Company: BP EXPLORATION
Well: W-9
Location: PRUDHOE BAY
Rig: AUDI #3
TELECO Job # 701TAK
Grid Correction: 0.0°
Magnetic Declination: 30.8°
Total grid correction: 30.8°
Proposed Direction: 204.0°
MINIMUM CURVATURE CALCULATION
Meas Course True Vertical Coordinates Closure Dog Leg
Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg deg/100'
ASSUME VERTICAL AT TIE IN
0 0 0.0 0.0 0.01 -0.01 0.01N 0.01E 0.01 N 45.00E 0.00
TELECO MWD SURVEYS
412 412 0.4 28.7 412.01 -1.48 1.31N 0.70E 1.48 N 28.19E 0.09
585 173 1.9 217.5 584.98 0.71 0.44S 0.76W 0.87 S 59.87W 1.33
675 90 4.4 213.3 674.84 5.57 4.51S 3.56W 5.74 S 38.29W 2.79
854 179 9.5 209.4 852.46 27.07 23.13S 14.59W 27.35 S 32.24W 2.86
PAGE 1
Company: BP EXPLORATION, Well: W-9, Location: PRUDHOE BAY, Riq: AUDI #3
Meas Course True Vertical Coordinates Closure Dog Leg
Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg deg/100'
1035 181 12.7 208.3 1030.06 61.79 53.67S 31.36W 62.16 S 30.30W 1.77
1214 179 17.5 206.6 1202.83 108.32 95.08S 52.75W 108.73 S 29.02W 2.69
1404 190 23.4 201.7 1380.79 174.62 155.74S 79.52W 174.86 S 27.05W 3.23
1593 189 28.3 199.2 1550.83 256.82 232.97S 108.14W 256.84 S 24.90W 2.66
1782 189 33.0 196.4 1713.38 352.54 324.72S 137.43W 352.61 S 22.94W 2.60
1923 141 38.1 194.3 1828.06 433.54 403.77S 159.04W 433.97 S 21.50W 3.71
2172 249 41.7 194.6 2019.05 591.00 558.41S 198.90W 592.78 S 19.61W 1.45
2361 189 46.7 194.3 2154.50 720.88 685.97S 231.75W 724.06 S 18.67W 2.65
2550 189 53.9 193.2 2275.15 863.85 827.14S 266.22W 868.93 S 17.84W 3.84
2710 160 57.8 193.2 2364.95 993.87 956.03S 296.45W 1000.94 S 17.23W 2.44
2920 210 59.5 193.2 2474.20 1170.01 1130.63S 337.40W 1179.90 S 16.62W 0.81
3238 318 59.0 192.9 2636.77 1438.30 1396.87S 399.12W 1452.77 S 15.95W 0.17
3832 594 59.2 192.2 2941.77 1937.80 1894.40S 509.87W 1961.82 S 15.06W 0.11
4301 469 59.3 191.8 3181.57 2331.99 2288.66S 593.67W 2364.40 S 14.54W 0.08
PAGE 2
ComDany: BP EXPLORATION, Well: W-9, Location: PRUDHOE BAY, Riq: AUDI #3
Meas Course True Vertical Coordinates Closure Dog Leg
Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg deg/100'
******************************************************************************************************
4767 466 58.2 191.8 3423.31 2721.32 2678.62S 675.14W 2762.39 S 14.15W 0.24
5336 569 57.7 193.9 3725.28 3194.38 3148.78S 782.36W 3244.52 S 13.95W 0.32
5802 466 56.4 195.3 3978.75 3580.09 3527.18S 880.89W 3635.52 S 14.02W 0.38
6267 465 55.0 195.3 4240.75 3959.78 3897.72S 982.26W 4019.58 S 14.14W 0.30
6838 571 54.4 194.6 4570.66 4419.97 4347.98S 1102.50W 4485.58 S 14.23W 0.15
7396 558 55.2 195.3 4892.31 4870.20 4788.50S 1220.14W 4941.50 S 14.30W 0.18
7957 561 60.0 195.0 5192.78 5338.07 5245.59S 1343.91W 5415.01 S 14.37W 0.86
8517 560 57.5 196.0 5483.24 5811.49 5706.90S 1471.87W 5893.65 S 14.46W 0.47
8854 337 56.5 202.4 5666.91 6092.88 5973.61S 1564.68W 6175.13 S 14.68W 1.62
9377 523 60.4 205.2 5940.55 6538.41 6381.17S 1744.68W 6615.38 S 15.29W 0.87
9938 561 59.2 203.4 6222.76 7023.22 6823.01S 1944.23W 7094.61 S 15.91W 0.35
0500 562 57.0 203.1 6519.68 7500.30 7261.38S 2132.59W 7568.06 S 16.37W 0.39
0873 373 59.2 205.5 6716.77 7816.92 7549.92S 2262.96W 7881.77 S 16.69W 0.80
PAGE 3
ComDany: BP EXPLORATION, Well: W-9, Location: PRUDHOE BAY, Riq: AUDI #3
Meas Course True Vertical Coordinates Closure Dog Leg
Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg feet feet feet feet feet deg deg/lO0'
******************************************************************************************************
1432 559 56.0 206.2 7016.22 8288.63 7974.66S 2468.68W 8348.03 S 17.20W 0.58
1993 561 54.3 210.4 7336.84 8747.60 8379.96S 2686.72W 8800.13 S 17.78W 0.69
2552 559 57.7 212.6 7649.41 9206.97 8774.91S 2928.95W 9250.83 S 18.46W 0.69
3116 564 59.6 213.6 7942.83 9682.58 9178.36S 3192.00W 9717.57 S 19.18W 0.37
3654 538 58.7 217.5 8218.79 10135.05 9554.08S 3460.41W 10161.44 S 19.91W 0.64
3842 188 61.0 221.0 8313.21 10291.86 9679.89S 3563.29W 10314.91 S 20.21W 2.03
4216 374 57.0 225.2 8505.81 10594.80 9914.01S 3782.08W 10610.92 S 20.88W 1.44
4568 352 55.8 228.4 8700.61 10865.14 10114.72S 3995.73W 10875.36 S 21.56W 0.83
PAGE 4
TELL~O Oilfield Services
PLAN VIEX
1600
BP EXPLORATION
PRUDHOE BAY
AUDI #3
JOB# 701TAK/O0
SCALE:
1 inch = 1600
236!
2920
'/
f e e t../
3832 ~t~
430~. V
4767 ~
5336 7
5802 7
739'6 j
7957 ~
8517jr~
1050~0/
14568
1600
3200
4800
6400
8000
9600
I 1200
12800
SO00
6400
4800 NEST320(0f t) '1600 0
1600
-lO00
0
2'OOO
4000
~6000
08000
>10000
12000
4000
16000
18000
: .,
TEL~ ~00ilfield Services
VERTICAL PROJECTION
1000 3000 5000 7000 9000
412 ' .4 deg
854 ' 9.5 deg
1404 ' 23.4 deg
,~. ' 58.2 deg
~5802 ' 56.4 deg
.' 54.4 deg
~,,7957 ' 60.01 aeg
' 56.5 deg
~ ' 59.2 deg
BP EXPLORATION
W-9
PRUDHOE BAY
AUDI #3
JOB# 701TAK/O0
SCALE:
~ inch = 2000
feet
ilO00
deg
59.6
14568 '
deg
55.8
VERTICAL SECTION (fL)
GREAT LAND DIRECTIONAL DRILLING INC.
REPORT OF SUB-SURFACE DIRECTIONAL SURVEY
mm
BP EXPLORATION
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmemmmmmmmmmmmmmm
COMPANY
# W-09
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm~mmmmmmmmmmmmmmmmmmmm
WELL NAME
WEST EILEEN
LOCATION
AL589-D22 SINGLE SHOT & MWD G/Z0/89
JOB NUMBER TYPE SURVEY ~/ATE
DIRECTIONAL
DON LEJEUNE SUPERVISOR .~__
NAME TITLE SIGNATURE
412 FT 14568 FT
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
DEPTH INTERVAL FROM TO
5/ -6/89 6/ 8/89
mmmmmmmmmemmmemmmmmmmmmmm~mmmmmmmmmmmmmmmmmmmmmmmmNmmmmmmmm
DATE SURVEY TAKEN FROM TO
THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL
WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR
FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU $0
DESIRE, ALL COPIES OF THE SURVEY REPORT WILL BE
FORWARDED TO YOU ON WRITTEN REQUEST. ALL SURVEYS ARE
KEPT IN A LOCKED FILE AND ARE H~,LD,~ . ~ ~.IN. STRICTEST~ , ~
CONFIDENCE. ~ ~- , ~ ~ ~ ~
GREAT LAND DIRECTIONAL DRILLING,INC
Client .............. : BP EXPLORATION
Well ................ : WEST EILEEN ~ W-09
Ve~ttcol Section at.: S 24.04 W
Magnetic Declination- 30 deg 48 min E
Data file name ...... : B:WWOPD.DAT
RECORD OF SURVEY
(Well assumed vertical to MD of
8/20/8~
Computation: RADIUS OF CURVATURE
Survey date: 5130189
Method ..... : SINGLE SHOT & MWD
RKB Height.: 90.7 ft
0.0!
MEAS
)EPTH DG MN
DRIFT TRUVERT SUBSEA SECTION
DEPTH DEPTH DIST
DIRECTION RELATIVE COORDINATES
ANGLE FROM WELL-HEAD
0 0 0 0.00 -90.88 0.00 N 0.00 E 0.00 N
412 0 24 412.00 321.34 -1.43 N 28.70 E 1.26 N
58S I S4 S84.98 4~4.30 -1.80 S 37.S0 W 2.S3 N
875 4 24 874.81 584.15 3.05 S 33.50 W 1.50 S
854 9 30 852.44 781.78 24.51 S 29.40 W 19.97 S
0.00 E
0.89 E
1.25 W
4.12 W
15.42 W
1035 12 42 1030.03 939.37
1214 17 30 1202.80 1112.14
1404 23 24 1380.75 1290.09
1593 28 18 1550.78 1480.]2
1782 33 0 1713.33 1822.87
59.23 S 28.30 W
105.77 S 28.80 W
172.10 S 21.70 W
254.31 S 19.20 W
350.08 S 18.40 W
50.48 S
91.85 S
152.38 S
229.58 S
321.27 S
32.23 W
S3.72 W
80.88 W
109.84 W
,139.08 W
1923 38 8 1828.01 1737.35
2172 41 42 2019.01 1928.35
2381 48 42 2154.48 2083.80
2550 53 54 2275.11 2184.45
2710 S7 48 2384.91 2274.25
431.08 S 14.30 W
588.53 S 14.80 W
718.41 S 14.30 W
881.39 S 13.20 W
991.41 S 13.20 W
400.29 S
S54.93 S
882.49 S
823.84 S
952.53 S
180.77 W
200.82 W
233.49 W
288.03 W
298.28 W
2920 S9 30 2474.18 2383.50 1187.55 S 13.20 W 1127.13 S
3238 59 0 2838.75 2548.09 1435.83 S 12.90 W 1393.38 S
3832 S9 12 2941.79 2851.13 1935.30 S 12.20 W 1890.87 S
4301 S9 18 3181.59 3090.93 2329.49 S 11.80 W 2285.12 S
4787 S8 12 3423.34 3332.88 2718.82 S 11.80 W 2875.08 S
339.21W
400.92 W
Sll.87 W
595.47 W
878.94 W
5338 S7 42 3725.28 3834.82 3191.90 S 13.90 W 3145.25 S 784.19-W
5802 58 24 3978.73 3888.07 3577.83 S 15.30 W 3523.85 S 882.78 W
8287 55 0 4240.77 4150.11 3957.29 S.15.30 W 3894.18 S 984.12 W
8838 S4 24 4570.72 4480.08 4417.45 S 14.80 W 4344.40 S 1104.34 W
7394 SS 12 4892.37 4801.71 4887.88 S 15.30 W 4784.~3 S 1221.98 W
CLOSURE
DISTANCE DG MN S
0.00 N 0 0 0 E
I .44 N 28 42 0 E
2.82 N 28 19 48 W
4.39 S 70 1 23 W
25.22 S 37 40 23 W
59.89 S 32 33 14 W
108.40 S 30 19 13 W
172.S0 S 27 S7 S W
254.40 S 25 31 43 W
3SO.OB S 23 24 30 W
431.37 S 21 S2 Sd W
590.08 S 19 S2 34 W
721.32 S 18 53 12 W
888.18 S 18 I 34 W
998.14 S 17 23 12 W
1177.08 S 18 44 58 W
1449.89 S 18 3 9 W
1958.87 S 15 8 30 W
2381.43 S 14 38 21W
2759.41 S 14 12 3 W
3241.54 S 14 0 0 W
3832.54 S 14 3 52 W
4018.59 S 14 10 S7 W
4482.58 S 14 1S 45 W
4938.49 S 14 19 33 W
DOG LE(
deg/lO(
0.00(
O. 09'~
O. 87~
2.77~
2.85(
1.
2.
3.13;
2.61(
2.52!
3.88:
1.44;
2.84;
3.82~
2.43~
0.81~
O. 17;
O. 09:
0.08'
O. 23{
O.
O. 34~
0.30:
O. 13;
O.
WEST EI[.EEN N W-O?
8/20/85)
RECORD OF SURVEY
MEAS DRIFT TRUVERT SUBSEA SECTION
DEPTH DG MN DEPTH DEPTH DIST
DIRECTION RELATIVE COORDINATES
ANGLE FROM WEL. L-HEAD
7957 80 0 S15)2.88 5102.22 S335.52 S 1S.O0 W S242.00 S
8517 S7 30 S483.37 S35)2.71 S808.5)2 S 18.00 W S703.25) S
8854 56 30 S888.5)1 S578.2G 805)0.40 S 22.40 W 5970.08 S
9377 80 24 S940.S1 S849.85 8535.5)8 S 25.20 W 8377.73 S
9938 59 12 8222.70 8132.04 7020.78 S 23.40 W 8819.81 S
1345.72
1473.85
1588.55
1748.35
1945.87
10500 57 0 8519.87 8429.01 7497.83 S 23.10 W 7257.5)8 S 2134.20
10873 59 12 8718.76 8626.10 7814.45 S 25.50 W 7546.53 S 2264.49
11432 58 0 7018.25 8925.59 8286.12 S 26.20 W 75)71.22 S 2470.25
215)5)3 54 18 7338.8~ 7248.15 8745.12 S 30.40 W 8378.48 S 2888.46
12552 S'! 42 7849.35 7558.89 9204.53 S 32.80 W 8771.53 S 25)30.55
13116 59 38 75)42.77 7852.11 5)880.18 S 33.80 W 9175.01S 3:[5)3.57
13854 58 h2 8218.85 8127.9~ 10132.88 S 37.S0 W 9550.72 S 3qd2.08
,.13842 81 0 8313~07 8222.41 10285).45) S 41.00 W 5)878.58 S 3584.89
14218 S7 0 8505.85 8414.5)9 1055)2.37 S 45.20 W 5)5)10.58 S 3783.84
lqS88 S5 48 8700.45 8809.75) 10882.85) S 48.40 W 10111.23 S 35)5)7.54
CLOSURE
DISTANCE DG MN S
5411.98 S 14 23 53 W
585)0.80 S 14 25) 15 W
8172.17 S 14 42 11 W
8812.51 S 15 18 48 W
705)1.79 S 15 55 31 W
7585.23 S 18 23 9 W
7878.98 S 18 42 11 W
8345.21 S 17 13 S W
8797.34 S 17 47 39 W
5)248.13 S 18 28 28 W
9714.92 S 19 11 30 W
10158.8~ S 15) 55 31W
10312.36 S 20 13 28 W
10608.33 S 20 53 49 W
10872.78 S 21 34 18 W
DOG LEC
deg/lO£
0. 857
0.464
1. 354
0.84~
0.315
O. 35)2
0.
O. 575
O. 575
0.87£
0. 362
0. 555
1. 877
1.33(
0.705
WEST EILEEN . W-09
DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH
8/20/89
MEAS. TRU VERT SUB SEA MD-TVD VERTICAL
DEPTH DEPTH DEPTt4 DIFF. CORRECT
~1 91 0 0 0
191 191 100 0 0
291 291 200 0 0
391 391 300 0 0
491 ~91 ~00 0 0
5~1 591 SOO 0 0
~91 691 600 0 0
7~2 791 700 1
893 891 800 2 1
9~5 991 900 ~ 2
1098
1201
1308
1415
1526
1639
1756
1877
2005
2135
2272
2418
2578
2759
2952
3148
3343
3538
3732
3928
1091 1000 7 3
1191 1100 10 3
1291 1200 17 7
1391 1300 24 7
1491 1400 35 11
1591 1500 48 13
1691 1600 65 17
1791 1700 86 21
1891 1800 114 28
1991 1900 144 30
2091 2000 181 37
2191 2100 227 46
2291 2200 287 60
2391 2300 368 81
2491 2400 .461 93
2591 2500 557 96
2691 2600 652 95
2791 2700 747 95
2891 2800 841 94
2991 2900 937 96
RELATIVE COORDINATES
FROM WELL-HEAD
0.28 N 0.15 E
0.58 N 0.32 E
0.89 N 0.49 E
1.20 N 0.65 E
1.84 N 0.19 W
2.27 N 1.43 W
3.15 S S.13 W
13.54 S 11.49 W
26.53 S 19.03 W
43.72 S 28.50 W
65.00 S 39.77 W
88.94 S 52.21 W
121.74 S 67.12 W
156.88 S 82.53 W
202.27 S 99.46 W
252.06 S
308.47 S
374.55 S
451.01S
531.98 S
116.86 W
134.97 W
153.71 W
173.84 W
194.71 W
622.41S
724.84 S
845.96 S
993.68 S
11.54'.14 S
218.01W
243.85 W
273.27 W
307.91W
345.47 W
1317.89 S
1481.28 S
1644.38 S
1807.47 S
1971.21S
383.43 W
420.49 W
456.80 W
493.11W
528.75 W
WEST EI[.EEN ~ W-09
DA-IA 1N'IERPOL.A'IL':D ['-OR EVEN 100 FEET OF SUBSEA DEP1H
6/20/89
NEAS. TRU VERT SUB SEA MD-TVD VERTICAL
DEPTH DEPTH DEPTH DIFF. CORRECT
4123
4318
4704
4894
5082
5271
5640
5823
6001
6178
6353'
6526
6699
6873
7046
7220
7393
7579
7766
7953
8145
8338
8530
8714
8899
9091
9282
9477
3091 3000 1032 95
3191 3100 1127 95
3291 3200 1220 93
3391 3300 1313 93
3491 3400 1403 90
3591 3500 1491 88
3691 3600 1580 89
3791 3700 1665 85
3891 3800 1749 84
3991 3900 1832 83
4091 4000 1910 78
4191 .4100 1987 77
4291 4200 2062 75
4391 4300 2135 73
4491 4400 2208 73
4591 4500 2282 74
4691 4600 2355 73
4791 4700 2429 74
4891 4800 2502 73
4991 ~900 2588 86
S091 SO00 2675 87
5191 S100 2762 87
5291 5200 2854 92
S391 S300 2947 93
5491 S400 3039 92
SS91 SSO0 3123 84
S691 5600 3208 85
5791 S700 3300 92
S891 5800 3391 91
5991 S900 3486 95
RELATIVE COORDINATES
FROM WELL-HEAD
2135.62 S
2299.75 S
2461.06 S
2622.37 S
2779.92 S
S63.70 W
S98.53 W
632.23 W
665.93 W
700.86 W
2935.63 S
3091.35 S
3242.86 S
3392.16 S
3540.51S
736.38 W
771.90 W
809.62 W
848.51W
887.37 W
3681.91S
3823.31S
3962.24 S
4098.70 S
4235.15 S
926.05 W
964.74 W
1002.30 W
1038.73 W
1075.17 W
4371.70 S
4508.66 S
4645.62 S
4782.58 S
4934.42 S
1111.63 W
1148.20 W
1184.77 W
1221.34 W
1262.44 W
S086.52 S
S238.62 S
S397.27 S
SS56.07 S
5713.89 S
1303.62 W
13~.81W
1388.78 W
1432.82 W
1477.3~ W
5859.23 S
6005.45 S
6154.45 S
6303.~5 S
6456.25 S
1527.95 W
1582.1S W
1647.87 W
1713.59 W
1781.81 W
WEST EILEEN ~ W-09
DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH
6120189
MEAS. TRU VERT SUB SEA MD-TVD VERTICAL
DEPTH DEPTH DEPTH DIFF. CORRECT
967G 6091 6000 3584 98
9874 6191 6100 3683 99
10067 6291 6200 3776 93
10256 639] 6300 3865 89
10445 6491 6400 3954 89
10634
10824
11011
11198
11384
11562
11737
11912
12089
12268
12447
12631
12824
13016
13209
13404
13599
13797
13993
14187
14370
14550
6591 6500 4043 89
6691 6600 4133 90
6791 6700 4220 87
6891 6800 4307 87
6991 6900 4393 86
7091 7000 4471 78
7191 7100 4546 75
7291 7200 4621 75
7391 7300 4698 77
7491 7400 4777 79
7591 7500 4856 79
7691 7600 4940 84
7791 7700 5033 93
7891 7800 5125 92
7991 7900 5218 93
8091 BO00 5313 95
8191 8100 5408 95
8291 8200 5506 98
8391 8300 5802 96
8491 8400 5696 94
8591 8500 5779 83
8691 8600 585'9 80
RELATIVE COORDINATES
FROM WELL-HEAD
6612.84 S
6769.43 S
6919.92 S
7067.53 S
72:15.J4 S
1852.51W
1923.21W
1988.96 W
2052.38 W
2115.80 W
7361.90 S
7508.31S
7851.32 S
7793.13 S
7934.93 S
2181.13 W
2247.23 W
2315.26 W
2383.97 W
2452.67 W
8065.29 S
8191.71S
8318.13 S
8444.54 S
8570.94 S
2520.90 W
2588.97 W
2657.04 W
2730.17 W
2807.63 W
8697.34 S
8828.33 S
8965.84 S
9103.35 S
9240.22 S
2885.09 W
2967.58 W
3057.22 W
3146.86 W
3240.18 W
9376.41S
9512.60 S
9646.71S
9770.85 S
9892.34 S
3337.50 W
3434.82 W
3540.49 W
3653.11W
3766.80 W
9998.13 S
10101.15 S
3877.10 W
3986.80 W
WEST EILEEN ~ W-09
DATA INTERPOLATED FOR EVEN 1000 FEET OF MEASURED DEPTH
6120189
MEAS. TRU VERT SUB SEA
DEPTH DEPTH DEPTH
RELATIVE COORDINATES
FROM WELL-HEAD
6000 4090 3999 3681.42 S 925.92 W
7000 466~ 4573 4472.29 S 1138.~9 W
8000 S215 5124 5277.~2 S 1355.54 W
9000 5743 S652 6083.87 S 1616.74 W
10000 6255 6164 6867.97 S 1966.6~ W
11000 '6785 6694 76~3.02 S 2311.24 W
12000 73~1 7250 8381.42 S 2691.q9 W
13000 7882 7791 9092.02 S 3139.48 W
14000 839~ 8303 9775.43 S 3557.39 W
1000 9~d 90L, Ah.58 S 28.98 W
2000 1887 1798 448.11S 173.10 W
3000 2515 2~24 119q.10 S 354.74 W
4000 3028 2937 2032.09 S S41.89 W
SO00 35~7 3~58 2887.81S 720.88 W
io00
2000
3000
T 4000
5oo0
6000
7000
8000
9000
t0000
liO00 ......................
1~000
13000
14000
4000 5000 6000 7000 8000
Departure
-1000
0 tO00 2000 3000
VERTICAL SECTION
BP EXPLORATION
WEST EILEEN # W-O9
SECTION AT S 24.04 W
TVB SCALE: 1 inch = 2000 feet
DEP SCALE: i inch = 2000 feet
DRAWN :6/20/89
Marker I~enttftcatton MD TVD DEPRT
A) KB 0 0 0
B} TD '1.4568 8700 '10863
9000 tO000 ttO00
Harker Identification MD TVD DEPRT
A) KB 0 0 0
B) TD 14568 8700 10863
HORIZONTAL VIEW
BP EXPLORATION
WEST EILEEN # W-09
, CLOSURE: 10873 ft S 21.6
iDECLINA-I'1'ON: 30.80 deg E
,SCALE' 1 inch = t600 feet
DRAWN' 6/20/89
"°°I
800
t600
2400
3200
4000
4800
5600
6400
7200 ................. I ........................................................................
BO00 ................................ ~
I
I
9600 ............ ~ ........
j~r
i
j III
10400 ...........~- ........................................
8800 8000 7200 6400 5600 4800 4000 3200 2400
1600 800 0 BOO
~J~ ! Il
I1I1
llOf
~="~q~-~$ UB. S URFA CE
DIRECTIONAL
SURVEY
r'~UIDANCE
r~ONTINUOUS
r~OOL
Company BP EXPLORATION
Well Name w-9 (41-32-11-12)I1437' SNL~l194' WELzSEC21zTllN,R12E)
Field/Location PRUDHOE BAY~ NORTH SLOPE~ ALASKA
Job Reference No.
73389
Lo~3{3ed By:
MCBRIDE
Date
.
28-JUN-89
Computed By:
KOHRING
GCT DIRECTIONAL SURVEY
CUSTOMER LISTING
FOR
8P EXPLORATION
(41-32-11-12)
PRUDHOE BAY
NORTH SLOPE, ALASKA
SURVEY DATE: 28-JUN-89
ENGINEER: MCBRIDE
METHODS OF COMPUTATION
TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH
INTERPOLATION: LINEAR
VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 21 ~EG 47 MIN WEST
COMPUTATION DATE: 06-JUL-B9 PAGE I
BP EXPLORATION
W-9 (41-32-11-123
PRUDHOE BAY
NORTH SLOPE~ ALASKA
DATE OF SURVEY: 28-JUN-89
KELLY BUSHING ELEVATION: 90.66 FT
ENGINEER: MCBRIDE
YNTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG
VERTICAL DOGLEG RE£TANGULAR COORDINATES HORIZ. DEPARTURE ·
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
0.00 0.00 -90.66 0 0 N 0 0 E
100.00 100.00 9.34 0 7 S 43 33 W
200.00 200.00 109.34 0 7 S 8 46 E
300.00 300.00 209.34 0 8 S 28 56 E
400.00 400.00 309.34 0 7 S 2 23 E
500.00 500.00 409.34 0 38 S 43 12 W
600.00 599.95 509.29 2 44 S 36 57 W
700.00 699.69 509.03 5 23 S 30 27 W
800.00 799.00 708.34 8 4 S 27 43 W
900.00 897.72 807.06 10 4 S 26 59 W
0.00 0.00 O.OO N O.O0 E
0.15 0.16 0.25 S 0.22 E
0.32 0.00 0.42 S O.1B E
0.48 0.01 0.62 S 0.26 E
0.65 0.04 0.83 S 0.31 E
1.12 1.49 1.24 S 0.08 E
3.80 2.51 3.37 S 1.83 W
10.70 2.71 9.28 S 5.61 W
22.23 3.23 19.46 S 11.20 W
38.12 1.58 33.64 S 18.56 W
0.00 N 0 0 E
O. 33 S 42 1 E
0.45 S 22 56 E
0.67 S 22 39 E
0.88 S 20 30 E
1.24 S 3 33 E
?
3.83 S 28 30 W
10.85 S 31 9 W
22.45 S 29 56 W
38.42 S 28 53 W
lO00.O0 995.90 905.24 11 48
1100.00 1093.20 1002.54 15 8
1200.00 1189.14 1098.48 17 29
1300.00 1283.76 1193.10 20 31
1400. O0 1316.32 1285.66 23 48
1500.00 1466.31 1375.65 27 33
1600.00 1554.47 1463.81 28 46
1700.00 1641.22 1550.56 30 51
1800.00 1726.00 1635.34 33 9
1900.00 1807.96 1717.30 37 5
S 26 22 W 56.98 1.80
S 25 19 W 79.95 3.37
S 24 34 W 108.08 2.22
S 22 53 W 140.38 3.96
S ZO 44 W 178.20 3.64
S 18 43 W 221.72 2.20
S 18 10 W 268.83 1.80
S 16 18 W 318.39 2.41
S 14 59 W 371.09 2.43
S 14 15 W /+27.89 4.68
50.56 S 27.03 W 57.34 S 28 8 W
71.28 S 37.09 W 80.35 S 27 30 W
96.83 S 48.94 W 108.50 S 26 69 W
126.39 S 62.01 W 140.78 S 26 8 W
161.51 S 76.04 W 178.52 S 25 13 W
202.51 S 90.75 W 221.91 S 24 8 W
247.31 S 105.57 W 268.90 S 23 7 W
294.83 S 120.22 W 318.40 S 22 11 W
345.90 S 134.46 W 371.11 S 21 15 W
401.29 S 148.90 W 428.02 S ZO 21 W
2000.00 1885.75 1'795.09 39 59
2100.00 1963.00 1872.34 39 20
2200.00 2038.85 1948.19 42 5
2300.00 2111.93 2021.27 44 1~+
2400.00 2181.18 2090.52 48 14
2500.00 2245.17 2!54.51 52 0
2600.00 2304.46 2213.80 55 1
2700.00 2360.21 2269.55 57 22
2800.00 2412.63 2321.97 58 57
2900.00 2464.07 2373.41 59 12
S 13 44 W 490.12 1.13
S 13 58 W 553.02 1.36
S 14 3 W 617.54 2.29
S 14 36 W 685.21 3.44
S 13 50 W 756.71 4.08
S 12 32 W 832.65 3.69
S 12 15 W 912.07 1.76
S 12 20 W 993.93 2.87
S 12 2/+ W 1077.94 0.1.~
S 12 31 W 1162.55 0.41
462.26 S 164.01 W 490.49 S 19 32 W
523.91 S 119.25 W 553.73 S 1~ 53 W
587.16 S 194.82 W 618.64 S 18 21 W
653.28 S 211.73 W 686.74 S 17 57 W
723.16 S 229.54 W 758.71 S 17 37 V
797.97 S 246.99 W 835.32 S 17 12
876.63 S 264.15 W 915.57 S 16 46 W
957.74 S 281.78 W 998.34 S 16 24 W
1040.92 S 300.04 W 1083.30 S 15 5 W
1124.67 S 318.47 W 1168.89 S 15 49 W
3000.00 2515.01 2424.35 59 36
3100.00 2565.51 2/+74.85 59 37
3200.00 2616.77 2526.11 58 45
3300.00 2669.05 2578.39 58 18
3400.00 2721.21 2630.55 58 47
3500.00 2772.91 26~2.25 58 5/+
3600.00 2824.51 2733.85 58 59
3700.00 2876.05 2785.39 58 58
3800.00 2927.56 2836.90 59 4
3900.00 2978.73 2888.07 59 18
S 12 27 W 1247.47
S 12 11 W 1332.61
S 11 52 W 1417.22
S 11 36 W 1501.16
S 11 35 W 1585.12
S 11 24 W 1669.35
S 11 19 W 1753.59
S 11 18 W 1837.85
S 11 21 W 1922.14
S 11 23 W 2005.64
0.53
0.62
0.46
0.51
0.39
0.24
0.00
0.00
0.17
0.36
1208.70 S 337.02 W 1254.81 S 15 35 W
1293.01 S 355.47 W 1340.99 S 15 22 W
1377.01 S 373.30 W 1426.71 S 15 10 W
1450.47 S 390.64 W 1511.81 S 14 58 W
1544.06 S 407.74 W 1596.98 S 14 48 W
1627.94 S 424.81 W 1682.45 S 14 38 W
1711.92 S 441.64 W 1767.97 S 14 28 W
1795.96 S 458.42 W 1853.54 S 14 19 W
1880.01 S 475.24 W 1939.14 S 14 11 W
1964.24 S 492.16 W Z024.96 S 14 4 W
COMPUTATION DATE: 06-JUL-B9 PAGE 2
BP EXPLORAT ION
W-9 (41-32-11-127
PRUDHOE BAY
NORTH SLOPEr ALASKA
DATE OF SURVEY': 28-JUN-89
KELLY BUSHING ELEVATION: 90.66 FT
ENGINEER: MCBRIDE
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SE~ COURSE
IEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH OEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTANGUL&R CDORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
400 0'. O0 3029.74 2939.08 59 25
4,100. O0 3080.55 2989.90 59 22
4200.00 3131.70 3041.04 59 16
4300.00 3182.71 3092.05 59 17
4400.00 3233.91 3143.25 59 11
4500.00 3285.31 3194.65 58 57
4600.00 333'7.06 3246.40 58 34
4700.00 3389.43 3298.77 58 18
4800.00 3442.01 3351.35 58 12
4900.00 3494.75 3404.09 58 15
S 11 2t W 2091.23
S 11 9 W 2175.90
S 11 12 W 2260.37
S 11 16 W 2344.92
S 11 19 W 2429.317
S 11 12 W 2513.72
S 11 20 W 2597.85
S 11 19 W 268!.63
S 11 28 W 2765.30
S 11 54 [4 2848.94
0.33
0.56
0.33
0.36
0.13
0.74
0.92
0.52
I .45
0.31
2048.57 S 509.10 W 2110.88 S 13 57 W
2133.03 S 525.91 W 2196.91 S 13 51 W
2217.35 S 542.53 W 2232.76 S 13 45 W
2301.71 S 559.26 W 2368.68 S 13 39 W ·
2385.95 S 576.08 W 2454.52 S 13 34 W ~
2470.08 S 592.84 W 2540.23 S 13 30 W
2554.00 S 609.53 W 2625.73 S 13 25 W
2637.52 S 626.30 W 2710.86 S 13 21 W
2720.91 S 643.11 W 2795.88 S 13 18 W
ZB04.1Z S 660.28 W Z8BO.B1 S 13 15 W
5000.00 3547.30 3456.64 58 ;'3
5100.00 3599.51 3508.85 58 40
5200.00 3651.71 3561.05 58 18
5300.00 3704.75 3614.09 57 40
5400.00 3758.38 3667.72 57 29
5500.00 3812.14 3721.48 57 22
5600.00 3866.60 3775.94 56 39
5700.00 3921.64 3830.98 56 40
5800.00 3976.88 3886.22 56 19
5900.00 4032.45 3941.79 56 13
S 12 22 W 2932.81
S 12 39 W 3016.99
S 12 59 W 3101.24
S 13 17 W 3185.04
S 13 31 W 3268.54
S 13 45 W 3352.01
S 14 15 W 3435.11
S 14 17 W 3517.88
S 14 13 W 3600.51
S 14 17. W 3682.93
0.38
0.30
0.44
0.24
0.27
0.94
0.79
0.46
0.21
0.68
2887.2_9 S 678.17 W 2965.87 S 13 13 W
2970.56 S 696.63 W 3051.15 S 13 12 W
3053.74 S 715.51 W 3136.45 S 13 11 W
3136.30 S 734.77 W 3221.22 S 13 11 W
3218.41 S 754.30 W 3305.62 S 13 11 W
3300.36 S 774.14 W 3389.94 S 13 12. W
3381.73 S 794.47 W 3473.80 S 13 13 W
3462.64 S 815.04 W 3557.27 S 1.3 15 W
3543.44 S 835.52 W 3640.62 S 13 16 W
3624.03 S 855.98 W 3723.75 S 13 17 W
6000.00 4088.46 3997.80 55 38
6100.00 4145.07 4054.41 55 24
6200.00 4201.94 4111.28 55 16
6300.00 4259.22 4168.56 54 51
6400.00 4316.91 4226.25 54 40
6500.00 4374.82 4284.16 54 33
6600.00 4432.9~ 4342.32 54 24
6700.00 4491.07 4400.41 54 32
6800.00 4549.16 4458.50 54 27
6900.00 4607.31 4516.65 54 29
S 14 11 W 3765.06
S 14 6 W 3846.76
S 14 3 W 3928.26
S 14 0 W 4009.48
S 14 1 W 4090.42
S 14 5 W 4171.20
S 14 7 W 4251.81
S 14 13 W 4332.49
S 14 8 W 4413.18
S 14 3 W 4493.79
0.29
0.38
0.38
0.33
0.36
0.47
0.27
0.18
0.15
0.35
3704.33 S 876.35 W 3806.58 S 13 19 W
3784.27 S 896.48 W 3889.00 S 13 20 W
3864.05 S 916.45 W 3971.25 S 13 Z1 W
3943.58 S 936.31 W 4053.21 S 13 21 W
4022.84 S 956.07 W 4134.89 S 13 22 W ~
4101.93 S 975.84 W 4216.41 S 13 23 W
4180.84 S 995.63 W 4297.75 S 13 24 W
4259.75 S 1015.56 W 4379.14 S 13 25 W
4338.67 S 1035.51 W 4460.53 S 13 25 W
4417.58 S 1055.29 W 4541.88 S 13 26 W
7000.00 4665.34 4574.68 54 31
7100.00 4723.57 4632.91 54 13
7200.00 4781.95 4691.29 54 15
7300.00 4840.75 4750.09 53 57
7400.00 4898.42 4807.76 55 28
7500.00 4954.54 4863.88 56 18
7600.00 5009.27 4918.61 57 14
7700.00 5062.88 4972.22 57 53
7800.00 5115.32 5024.66 58 53
7900.00 5166.41 5075.75 59 47
S 14 10 W 4574.51
S 14 15 W 4655.09
S 14 17 W 4735.59
S 14 17 W 4815.78
S 14 16 W 4896.77
S 14 9 W 4978.81
S 14 21 W 5061.78
S 14 22 W 5145.49
S 14 20 W 5229.92
S 14 6 W 5315.13
0.05
0.78
1.23
0.95
0.78
1.31
0.55,
0.44
0.82
1.02
4496.57 S 1075.14 W 4623.32 S 13 27 W
4575.37 S 1095.09 W 4704.60 S 13 28 W
4654.07 S 1115.10 W 4785.79 S 13 28 W
4732.45 S 1135.06 W 4866.66 S 13 29 W
4811.63 S 1155.17 W 4948.35 S 13 30 W
4891.86 S 1175.47 W 5031.11 S 13 31 W
4972.99 S 1196.04 W 5114.80 S 13 31 W
5054.77 S 1216.97 WI 5199.20 S 13 32 WI
5137.26 S 1238.08 W 5284.34 $ 13 33 W
5220.59 S 1259.18 W 5370.29 S 13 34 W
C~MPUTATION DATE: OS-JUL-89
PAGE
EP EXPLORATION D~TF OF SURVEY: 28-JUN-89
W-9 (41-32-11-12) KELLY BUSHING ELEVATION: 90.66 FT
PRUDHDE BAY
NORTH SLOPEr ALASKA ENGINEER: HC~RIDE
INTERPOLATED VALUES FOR EVEN 100 FEET O~ MEASURED DEPTH
TRUE SU3-SE~ COURSE VERTICAL OOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
EASURED VERTICAL VERTI£AL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN
8000.00 5216.62 5125.96 59 44
8100.00 5267.26 5176.60 59 31
8200.00 5318.26 5227.60 59 7
8300.00 5370.12 5279.46 58 24
8400.00 5422.7,.5 5332.10 58 5
8500.00 5476.01 5385.35 57 30
8600.00 5530.08 5439.42 57 2
8700.00 5585.29 5494.63 56 10
8800.00 5640.74 5550.08 56 29
8900.00 5695.74 5605.08 56 53
9000.00 57¢9.80 5659.14 57 35
9100.00 5802.98 5712.32 58 12
9200.00 5855.09 5764.43 58 56
9300.00 5906.14 5815.48 59 41
9400.00 5955.98 5865.32 60 31
9500.00 6004.80 5914.14 60 49
9600.00 6053.75 5963.09 60 36
9700.00 6103.11 6012.4,5 60 15
9800.00 6153.07 6062.41 59 48
9900.00 6203.72 6113.06 59 21
0000.00 6255.07 6164.41 58 51
0100.00 6307.21 67.16.55 58 20
0200.00 6360.04 6269.38 57 51
0300.00 6413.64 6322.98 57 21
0400.00 6467.82 6377.16 57 5
0500.00 6522.21 6~.31.55 56 58
0600.00 6576.80 6486.14 57 0
0700.00 6630.49 6539.83 58 6
0800.00 6682.92 6592.26 58 36
0900.00 6734.51 6643.85 59 19
1000.00 6784.92 6694.26 60 1
.1100.00 6835.14 6744.48 59 35
1200.00 6886.45 6795.79 58 39
1300.00 6939.31 6848.65 57 31
1400.00 6993.88 6903.22 56 22
1500.00 7050.06 6959.40 55
1600.00 7107.7! 7017.05 54 25
.1700.00 7166.36 7075.70 53 50
,1800.00 7225.47 7134.31 53 45
.1900.00 7284.55 7193.89 53 52
S 14 9 W 5400.83
S 14 6 W 5486.29
S 14 10 W 5571.54
S 14 20 W 5656.31
S 14 37 W 5740.64
S 14 57 W 5824.64
S 15 41 W 5908.22
S 17 52 W 5991.26
S 20 39 W 6074.39
S 23 15 W 6157.89
S 23 58 W 6241.97
S 24 4 W 6326.59
S 24 7 W 6411.87
S 24 11 W 6497.78
S 24 15 W 6584.40
S 24 11 W 6671.59
S 23 55 W 6758.73
S 23 30 W 6845.65
S 23 13 W 6932.24
S 23 Z W 7018.44
S 22 48. W 7104.23
S 22 32 W 7189.55
S 22 16 W 7274.45
S 22 19 W 735 8.87
S 22 37 W 7442.92
S 22 53 W 7526.82
S 23 16 W 7610.58
S 23 7 W 769¢.92
S 23 13 W 7780.04
S 23 9 W 7865.68
S 23 O W 7952.02
S 23 18 W 8038.47
S 23 42 W 8124.26
S 24 7 W 8209.09
S 24 55 W 8292.79
S 26 2 W 8375.35
S 27 19 W 8456.76
S 28 37 W 8537.28
S 28 35 W 8617.35
S 28 34 W 8697.4.7
0.55
0.28
0.19
0.39
0.50
0.84
1.75
2.09
2.47
1,82
0.53
0.68
0.67
0.96
0.76
0.44
0.46
0.52
0.47
0.47
0.56
0.52
0.71
0.50
0.21
0.50
0.78
0.92
0.46
0.95
0.59
0.69
0.90
1.28
1.19
1.30
1.45
0.67
0.35
0.34
5304.46 S 1280.24 W 5456.77 S 13 34 W
5388.08 S 1301.29 W 5543.00 S 13 35 W
5471.50 S 1322.28 W 5629.01 S 13 35 W
5554.39 S 1343.28 W 5714.51 S 13 36 W
5636.71 $ 1364.53 W 5799.52 S 13 37 W
5718.55 S 1386.11 W 5884.14 S 13 38 W
5799.73 S 1408.19 W 5968.23 S 13 39 W
5879.56 S 1432.21 W 6051.48 S 13 41 W
5958.14 S 1459.56 W 6134.31 S 13 46 W
6035.55 S 1490.90 W 6216.96 S 13 53 W
6112.57 S 1524.7¢ W 6299.86 S 14 0 W
6189.93 S 1559.20 W 6383.28 S 14 8 W
6267.84 S 1594.03 W 6467.36 S 14 16 W
6346.31 S 1629.19 W 6552.09 S 14 24 W
6425.38 S 1664.75 W 6637.54 S 14 32 W
6504.96 S 1700.56 W 6723.57 S 14 39 W
6584.59 S 1736.12 W 6809.62 S 14 46 W
6664.23 S 1771.07 W 6895.55 S 14 53 W
6743.76 S 1805.38 W 6981.24 S 14 59 W
6813.07 S 1839.23 W 7066.61 S 15 5 W
6902.11 S 1872.64 W 7151.63 S 15 11 W
6980.85 S 1905.51 W 7236.24 S 15 16 W
7059.35 S 1937.85 W 7320.50 S 15 21 W
7137.48 S 1969.83 W 7404.32 S 15 26 W
7215.17 S 2001.91 W 7487.75 S 15 30 W
7292.54 S 2034.40 W 7570.99 S 15 35 W
7369.59 S ~_067.31 W 7654.06 S 15 40 W
7447.14 S 2100.53 W 7737.71 S 15 45 W
7525.43 S 2134.00 W 7822.16 S 15 50 W
7604.17 S 2167.74 W 7907.12 S 15 55 W
7683.65 S 2201.53 W 7992.82 S 15 59 W
7763.17 S 2235.51 W 8078.63 S 16 4 W
7841.90 S 2269.69 W 8163.76 S 16 9 W
7919.50 S 2304.09 W 8247.87 S 16 13 W
7995.76 S 2338.83 W 8)30.81 S 15 18 W
8070.48 S 2374.32 W 8412.49 S 16 24 W
8143.50 S 2410.98 W 8492.90 S 16 30 W
8215.00 S 2449.03 W 8572.28 S 16 36 W
8285.78 S 2487.71 W 8651.18 S 16 43 W
8356.66 S '2526.25 W 8730.16 S 16 49 W
COMPUTATION OATE: 06-JUL-89 PAGE 4
BP EXPLORATION
W-9 C41-32-11-12)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY: 28-JUN-89
KELLY BUSH'lNG ELEVATION: 90.66 FT
ENGINEER: MCBRIDE
INTERPQLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUS-SE~ COURSE
EASURED YER'TICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH OEPTH 'BEG MIN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
2000.00 7343.24 7252.58 54 15
2100.00 7401.46 7310.80 54 35
2200.00 7458.99 7368.33 55 11
2300.00 7515.36 7424.70 56 14
2400.00 7570.35 7479.69 56 58
2500.00 7624.60 7533.94 57 20
2600.00 7679.23 7587.57 57 50
2700.00 7731.18 7640.52 58 10
2800.00 7783.73 7693.07 58 29
2900.00 7835.88 7745.22 58 37
S 28 45 W 8777.87
S 29 16 W 8858.53
S 29 48 W 8939.57
S 30 35 W 9021.28
S 31 2 W 9103.76
S 31 3 W 91 86.68
S 31 Z W 9269.98
S 31 4 W 9353.70
S 31 26 W 9437.65
S 31 42 W 9521.76
0.47
0.72
0.87
1.29
0.18
0.40
0.48
0.21
0.5!
0.63
8427.74 S 2565.04 W 8809.43 S 16 56 W
8498.86 S 2604.44 W 8888.96 S 17 2 W
8570.02 S 2646.76 W 8968.83 S 17 9 W
8641.43 S 2686.26 W 9049.33 S IT 16 W
8713.12 S 2729.10 W 9130.53 S 17 23 W
8785.13 S 2772.38 W 9212.19 S 17 31 W
8857.43 S 2815.92 W 9294.27 S 17 38 W
8930.12 S 2859.64 W 9376.81 S 17 45 W
9002.94 S 2903.65 W 9459.60 S 17 53.W
9075.73 S 2948.16 W 9542.57 S 18 0 W
,3000.00 7887.42 7796.76 59 20
~3100.00 7938.22 7847.56 59 31
3200.00 7989.25 7898.59 59 3
,3300.00 8040.99 7950.33 58 41
,3400.00 8093.32 8002.66 58 2
,3500.00 8166.87 8056.21 57 20
3600.00 8200.54 8109.88 57 53
,3700.00 8252.93 8162.27 59 4
.3800.00 8303.28 8212.62 60 27
,3900.00 8352.44 8261.78 60 18
S 31 43 W 9606.16
S 31 37 W 9691.02
S 31 17 W 9775.79
S 31 34 W 9860.18
S 32 50 W 9944.00
S 33 37 W 10026.76
S 35 4 W 10109.15
S 36 50 W 10191.72
S 38 12 W 10274.86
S 38 55 W 10358.22
0.59
0.34
0.58
0.86
1.62
0.76
1.98
1.99
1.52
1.16
9148.59 S 2993.27 W 9625.82 S 1B 7 W
9221.91 S 3038.48 W 9709.58 S 18 14 W
9295.28 S 3083.34 W 9793.32 S 18 21 W
9368.37 S 3127.85 W 9876.73 S 18 28 W
9440.52 S 3173.19 W 9959.54 S 18 35 W
9511.14 S 3219.51 W10041.26 S 18 42 W
9580.89 S 3266.97 W10122.57 S 18 50 W
9649.82 S 3317.00 W10203.99 S 18 58 W
9718.30 S 3369.68 1,110285.91 S 19 7 W
9786.36 S 3423'99 W10368.06 S 19 17 W
.4000.00 8402.67 8312.01 59 25
.4100.00 8454.10 8363.44 58 35
.4200.00 8507.30 8416.64 57 8
.4300.00 8562.64 8471.98 55 48
· 4400.00 8618.86 852:8.20 55 42
.4500.00 8675.19 8584.53 55 47
,4600.00 8731.55 8640.89 55 37
· 4700.00 8787.96 8697.30 55 42
.4800.00 8844.43 8753.77 55 32
,4900.00 8901.04 8810.38 55 35
S 39 ZZ W 10440.76
S 40 23 W 10522.29
S 42 1 W 10602.17
S 43 57 W 10679.81
S 44 45 W 10756.14
S 45 42 W 10831.98
S ~.6 47 W 10907.18
S ~,7 35 W 10981.74
S 48 Z W 11055.86
S 47 55 W 11129.83
0.87 9853.45 S 3478.55 W10449.44 S 19 27 W
1.68 9919.29 S 3533.50 W10529.86 S 19 36 W
2.35 9983.07 S 3589.17 W10608.67 S 19 46 W
1.15 10043.97 S 3645.98 W10685.25 S 19 57 W
1.33 10103.06 S 3703.84 W10760.59 S 20 8 W
1.46 10161.31 S 3762.44 W10835.51 S 20 19 W
1.18 10218.46 S 3822.08 W10909.87 S 20 30 W
0.51 10274.54 S 3882.69 W10983.69 S 20 42 W
0.21 10329.91 S 3943.88 Wl1057.18 S ZO 54 W
0.29 10385.09 S 4005.12 Wl1130.64 S 21 5 W
,5000.00 8957.47 8866.81 55 43
.5100.00 9013.64 8922.98 55 53
· 5200.00 9069.77 8979.11 55 51
.5300.00 9125.95 9035.29 55 49
,5400.00 9182.14 9091.48 55 49
,5430.00 9199.00 9108.34 55 49
S 47 46 W 11204.00
S 47 28 W 11278.44
S 47 15 W 11353.09
S 47 10 W 11427.78
S 47 10 W 11502.52
S 47 10 W 11524.94
0.13 10440.51 S 4066.32 Wl1204.42 S 21 17 W
0.45 10496.25 S 4127.46 Wl1278.61 S 21 28 W
0.30 10552.30 S 4188.34 W11353.12 S 21 39 W
0.00 10608.57 S 4248.83 Wl1427.78 S 21 50 W
0.00 10664.81 S 4309.48 Wl1502.60 S 22 0 W
0.00 10681.68 S 4327.68 Wl1525.07 S 22 3 W
COMPUTATION DATE: 06-JUL-SD PAGE 5
BP EXPLORATION
W-9 (41-32-11-123
PRUOHOE BAY
NORTH SLOPE, ALASKA
D~TE DF SURVEY: 28-JUN-89
KELLY BUSHING ELEVATION: 90.66 FT
INTERPgLATED VALUES FOR EVEN lO00 FEET DF MEASURED DEPTH
TRlJE SUE-SEA COURSE
EASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
0.00 0.00 -90.66 0 0
1000.00 995.90 905.24 11 48
2000.00 18 3'?i. 75 1,79 5.09 39 59
3000.00 2515.01 242&. 35 59 36
4000.00 3029.74 2979.0~ 59 25
5000.00 3547.30 3456.64 58 23
6000.00 49~3~,46 ?997.80 55 38
7000.00 ,4665.34 457Z,. 68 54 31
8000.00 5216.62 5125.96 59 44
9000.00 5749.80 5659.14 57 35
ENGINEER: MCBRIDE
0000.00 6255.07 6164.41 58 51
1000.00 6794.92 6694.26 60 1
2000.00 7343.24 7252.58 54 15
3000.00 7887.42 7796.76 59 20
4000.00 8402.67 8312.01 59 25
5000.00 8957.47 8,~66.81 55 43
5430.00 9199.00 9108.34 55 49
VERTICAL DOGLEG RECTANGULAR COORDIN~,TES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
N 0 0 E 0.00
S 13 44 W 490.12
S 12 27 W 1247.47
S t1. 21 W 2091.23
S 12 2! W 2932.31
S 14 1l W 3765.06
S 14 lO W 4574.51
S 14 9 W 5400.83
S 23 59 W 6241.97
S 22 48 W 7104.23
S Z3 0 W 7952.02
S 28 45 W 8777.87
S 31 43 W 9606.16
S 39 22 W 10440.76
S 47 46 W 11204.00
S 47 10 W 11524.94
0.00
1
1.13
0.5,3
0.33
0
0.29
0.05
0.55
0.53
0.03 fl 0.00 5 0.00 N 0 0 E
50.55 S 27.03 W 57.34 S 28 8 W
462.26 S 164.01 W 490.49 S 1~ ?2 W
1208.70 S 337.02 W 1254.~1 S 15 35 W
2048.57 S 509.10 W 2110.88 S 13 57 W
2887.29 S 678.17 ~ 2965.87 S 13 13 W
3704.33 S 8'76.35 W 3806.58 S 13 19 W
¢496.57 S 1075.14 W 4623.32 S 13 27 W
5304.46 S 1280.24 W 5456.77 S 13 34 W
6112.57 S 1524.74 W 6299.86 S 14 0 W
0.56 6902.11 S 1872.64 W 7151.63 S 15 11 W
0.59 7683.65 S 2201.53 W 7992..82 S 15 59 W
0.47 8427.7~ S 2555.04 W 8809.43 S 16 56 W
0.59 9148.59 S 2993.27 W 9625.82 S 18 7 W
0.8]' 9853.45 S 3478.55 W10449.4% S 19 27 W
0.13 10440.51 S 4066.32 Wl1204.42 S 21 17 W
0.00 10681.68 S 4327.68 Wl1525.07 S 2.2 3 W
COMPUTATION DATE: 06-JUL-BO PAGE 6
BP EXPLORATION
W-9 (41-32-11-123
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY: 28-JUN-89
KELLY BUSHING ELEVATION:' 90.66 FT
ENGINEER: MCBRIDE
INTERPOLATED VALUES FaR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SU3-SEA COURSE
EASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NDRTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET OEG/IO0 FEET FEET FEET DEG MIN
0.00 0.00 -90.56 0 0 N 0 0 E
90.66 90.66 0.00 0 9 S 29 58 W
190.66 190.66 100.00 0 7 S 5 37 E
290.66 290.66 200.00 0 8 S 29 26 E
390.66 390.66 300.00 0 7 S 4 31 E
490.66 490.66 400.00 0 29 S 40 36 W
590.70 590.66 500.00 2 30 S 38 9 W
690.93 690.66 600.00 5 8 S 30 48 W
791.57 790.66 700.00 7 48 S 27 47 W
892.84 890.66 800.00 9 57 S 27 4 W
0.00 0.00 0.00 N 0.00 E
0.12 0.48 0.22 S 0.22 E
0.31 0.03 0.40 S 0.18 E
0.46 0.00 0.60 S 0.25 E
0.63 0.00 0.81 S 0.31 E
1.03 1.14 1.17 S 0.15 E
3.37 2.32 3.00 S 1.56 W
9.87 2.84 8.56 S 5.18 W
21.07 3.09 18.43 S 10.66 W
36.!39 1.59 32.54 S 17.99 W
0.00 N 0 0 E
0.31 S 45 51 E
0.44 S 23 39 E
0.65 S 22 28 E
0.86 S 20 56 E
1.18 S 7 22 E
3.39 S 27 26 W
10.00 S 31 12 W
21.29 S 30 3 W
37.18 S 28 57 W
994.65 990.66 900.00 11 42
1097.37 1090.66 1000.00 15 3
1201.59 1190.66 1100.00 17 31
1307.37 1290.66 1200.00 20 48
1415.72 1390.66 1300.00 24 25
1527.52 1490.66 1400.00 27 57
1641.47 1590.65 1500.00 29 37
1757.99 1690.66 1600.00 32 14
1878.46 1790.66 1700.00 36 5
2006.40 1890.66 1800.00 39 55
S 26 24 W 55.91 1.81
S 25 21 W 79.26 3.51
S 24 34 W 108.56 2.23
S 22 43 W 142.96 3.94
S 20 27 W 184.62 4.27
S 18 19 W 234.51 0.96
S 17 13 W 289.03 2.35
S 15 27 W 348.54 2.30
S 14 26 W 4.15.18 4.66
S 13 44 W 4.94.18 1.61
4.9.60 S 26.55 W 56.26 S 2t3 10 W
70.65 S 36.80 W 79.66 S 27 31 W
97.27 S 49.14 W 108.98 S 26 4.8 W
128.77 S 63.02 W 143.36 S 26 5 W
167.53 S 78.30 W 184.93 S 25 3 W
214.65 S 94.82 W 234.66 S 23 50 W
266.60 S 111.73 W 289.07 S 22 44 W
323.98 S 128.51 W 348.54 S 21 38 W
388.87 S 145.73 W 415.28 S ZO 33 W
466.25 S 164.98 W 494.58 S 19 29 W
2135.94 1990.66 1900.00 40 g
2270.52 2090.66 2900.00 4.3 23
2414.37 2190.66 2100. O0 48 50
2576.11 2290.66 2200.00 54 30
2757.55 2390.66 2300.00 58 39
2952.04 2490.66 2400.00 59 23
3149.38 25)0.66 2500.00 59 10
3341.25 2690.66 2600.00 58 30
3534.38 2790.65 2700.00 58 55
3728.34 2890.66 2800.00 58 58
S 13 44 W 575.75
S 14 23 w 664.97
S 13 39 w 767.40
S 12 15 W 892.83
S 12 25 W 1042.10
S 12 26 W 1206.70
S 11 59 W 1374.49
S 11 32 W 1535.73
S 11 21 W 169~3.31
S 11 19 W 1861.73
3.57
2.51
4.22
2.43
I .46
0.54
I .19
0.55
0.27
0.04
546.19 S 184.75 W 576.59 S 18 41 W
633.53 S 206.62 W 666.37 S 18 4 W
733.65 S 232.09 W 769.49 S 17 33 W
857.57 S 260.01 W 896.12 S 16 52 W
1005.44 S 292.24 W 10/+7.05 S 16 12 W
1168.35 S 328.12 W 1213.55 S 15 41 W
1334.57 S 364.34 W 1383.41 S 15 16 W
1494.89 S 397.69 W 1546.88 S 14 54 W
1656.80 S 430.61 W 1711.85 S 14 34 W
1819.77 S 463.18 W 1877.79 S 14 17 W
3923.36 2990.66 2900.00 59 17
4119.76 3090.66 3000.00 59 17
4315.55 3190.66 3100.00 59 15
4510.38 3290.66 3200.00 58 56
4702.34 3390.66 3300.,30 58 17
4892.23 3490.66 3400.00 58 15
5082.99 3590.66 3500.00 58 38
5273.60 3690.66 3600.00 57 47
5460.08 3790.66 3700.00 57 31
5643.71 3890.66 3800.00 56 34
S 11 22 W 2026.39
S 11 9 W 2192.60
S 11 15 W 2358.06
S 11 12 W 2522.47
S 11 19 W 2683.58
S 11 52 W 2842.43
S 12 36 W 3002.65
S 13 13 W 3162.96
S 13 38 W 3318.69
S 14 17 W 3471.28
0.27
0.42
0.35
0.69
0.50
0.24
0.33
0.81
0.38
0.92
1983.93 S 496.12 W 2045.02 S 14. 2 W
2149.70 S 529.19 W 2213.88 S 13 50 W
2314.83 S 561.87 W 2382.04 S 13 39 W
2478.81 S 594.56 W 2549.11 S 13 29 W
2639.47 S 626.69 W 2712.85 S 13 21 W
2797.65 S 658.91 W 2874.20 S 13 15 W
2956.38 S 693.46 W 3036.62 S 13 12 W
3114.56 S 729.66 W 3198.89 S 13 11 W
3267.67 S 766.18 W 3356.29 S 13 1Z W
3417.10 S 803.45 W 3510.28 S 13 14 W
COMPUTATION D~TE: 06-JUL-89 PAGE 7
BP EXPLORATION
W-9 (41-32-11-127
PRUOHDE BAY
NORTH SLDPE~ ALASKA
DATE OF SURVEY= 28-JUN-89
KELLY BUSHING ELEVATION= 90.66 FT
ENGINEER: MCBRIDE
INTERPOLATED VALUES FOR EVEN 100 FEET DF SUB-SEA DEPTH
TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
EASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY, NORTH/SOUTH EAST/WEST DIST. AZIMUTH
DEPTH DEPTH DEPTH DEG MIN
5824,82 3990.66 3900.00 56 15
6003.91 4090.66 4000.00 55 37
6180.20 4190.66 4100.00 55 19
6354.55 4290.66 4200.00 54 46
6527.27 4390.66 4300.00 54 28
6699.29 4490.66 4400.00 54 32.
6871.36 4590.66 4500.00 54 26
7043.58 4690.66 4600.00 54 26
7214.90 4790.66 4700. O0 54 lO
7386.29 4890.66 4800. O0 55 22
7565.72 4990.66 4900.00 57 2
7752.62 5090.66 5000.00 58 23
7948.32 5190.66 5100.00 59 58
8146.03 5290.66 5200.00 59 22
8339.14 5390.66 5300.00 58 15
8527.20 5490.66 5400.00 57 22
8709.65 5590.66 5500.00 56 11
8890.67 5690.66 5600.00 56 48
9076.71 5790.66 5700.00 58 3
9269.40 5890.66 5800.00 59 27
9470.98 5990.66 5900.00 60 5~
9674.88 6090.66 6000.00 60 21
9874.35 6190.66 6100.00 59 27
0068.41 6290.66 6200.00 58 29
0257.31 6390.66 6300.00 57 32
0442.04 6490.66 6400.00 57 5
0625.50 6590.66 6500.00 57 13
0814.90 6690.66 6600.00 58 41
1011.49 6790.66 6700.00 60 2
1208.05 6890.66 6800.00 58 34
1394.18 6990.66 6900.00 56 26
1570.61 7090.66 7000.00 54 39
1741.14 7190.66 7100.00 53 45
1910.36 7290.66 7200.00 53 54
2081.41 7390.66 7300.00 54 30
2255.85 7490.66 7400.00 55 44
2437.31 7590.66 750D.00 57 5
2623.39 7690.66 7600.00 57 56
2813.24 7790.66 7700.00 58 32
3006.35 7890.66 7800.00 59 22
DEG MIN FEET DEG/tO0 FEET FEET FEET DEG MIN
S 14 1~ W 3620.98
S 14 11 W 3768.26
S 14 3 W 3912.14
S 14 1 W 4053.65
S 14 5 W 4193.20
S 14 13 W 4331.91
S 14 4 W 4470.70
S 14 13 W 4609.67
S 14 IF/ W 4747.57
S 14 16 W 4885.56
S 14 16 W 5033.23
S 14 22 W 5189.80
S 14 5 W 5356.55
S 14 7 W 5525.57
S 14 27 W 5689.34
S 15 2 W 5847.40
S 18 7 W 5999.26
S 23 6 W 6150.07
S 24 3 W 6306.84
S 24 9-W 6471.41
S 24 14 W 6646.28
S 23 36 W 6823.84
S 23 5 W 6996.36
S 22 38 W 7162.64
S 22 16 W 7322.89
S 22 44 W 7478.20
S 23 15 W 7631.98
S 23 13 W 7792.77
S 23 I W 7961.97
S 23 44 W 8131.13
S 24 52 W 8287.95
S 26 54 W 8432.92
S 28 43 W 8570.24
S 28 34 W 8705.79
S 29 19 W 8843.52
S 30 12 W 8985.10
S 31 0 W 9134.65
S 31 I W 9289.54
S 31 19 W 9448.78
S 31 42 W 9611.54
0.45
0.23
0.34
0.10
0.35
0.18
0.18
0
1.32
0.78
3563.46 S 840.59 W 3661.26 S 13 16 W
.3707.46 S 877.14 W 3809.81 S 13 19 W
3848.27 S 912.50 W 3954.98 S 13 ZO W
3936.84 S 947.09 W 4097.79 S 13 22 W
4123.47 S 981.24 W 4238.61 S 13 23 W
4259.19 S 1015.42 W 4378.56 S 13 25 W
4394.98 S 1049.64 W 4518.58 S 13 26 W
4530.96 S 1083.83 W 4658.79 S 13 27 W
4665.78 S 1118.08 W 4797.87 S 13 29 W
4800.67 S 1152.38 W 4937.05 S 13 30 W
0.66
1.34
0.46
0.58
0.54
0.60
2.23
2.02
0.67
0.44
4945.09 S 1188.93 W 5086.01 S 13 31 W
5098.06 S 1228.06 W 5243.89 S 13 33 W
5261.12 S 1269.35 W 5412.09 S 13 34 W
5426.52 S 1310.95 W 5582.63 S 13 35 W
5586.65 S 1351.56 W 5747.82 S 13 36 W
5740.69 S 1392.04 W 5907.05 S 13 38 W
5887.19 S 1434.67 W 6059.47 S 13 42 W
6028.37 S 1487.79 W 6209.24 S 13 52 W
6171.87 S 1551.14 W 6363.81 S 14 6 W
6322.23 S 1618.39 W 6526.08 S 14 22 W
0
0.49
0.48
0.56
0.34
0.28
1.22
0.55
0.55
1.01
6481.85 S 1690.18 W 6698.59 S 14 37 W
6644.22 S 1762.35 W 6873.98 S 14 51 W
6802.75 S 1830.58 W 7044.74 S 15 4 W
6956.00 S 1895.18 W 7209.55 S 15 14 W
7104.19 S 1956.20 W 7368.59 S 15 24 W ~
?247.74 S 2015.51 W 7522.76 S, 15 32 W
/
7389.26 S 2075.76 W 7675.28 S 15 41 W
7537.14 S 2139.02 W 7834.79 S 15 51 W
7692.81 S 2205.42 W 8002.70 S 16 0 W
7848.18 S 2272.46 W 8170.56 S 16 9 W
1.20 7991.36 S 2336.79 W 8326.01 S 16 28 W
1.38 8122.19 S 2400.08 W 8469.37 S 16 28 W
0.15 8244.14 S 2464.95 W 8604.75 S 16 39 W
0.43 8364.01 S 2530.25 W 8738.36 S 16 50 W
0.59 8485.64 S 2597.06 W 8874.17 S 17 1 W
1.38 8609.86 S 2667.75 W 9013.69 S 17 13 W
0.45, 8739.95 S 2745.22 W 9160.95 S 17 26 W
0.41 8874.41 S 2826.13 W 9313.55 S 17 40 W
0.50 9012.59 S 7909.50 W 9470.58 S 17 53 W
0.48 9153.24 S 2996.14 W 9631.13 S 18 7 W
COMPUTATION DATE: 06-JUL-89 PAGE
BP EXPLORATION
W-9 (41-32-11-12)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY: 28-JUN-89
KELLY BUSHING ELEVATION: 90.6.6 FT
ENGINEER: MCBRIDE
INTERPDLATEO VALUES FOR EVEN 100 FEET OF SUB-SE~ DEPTH
TRUE SUB-SE~ COURSE
EASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG
VERTICAL OOGLEG RECTANGULAR COORDINATES HORIZ. OEPRRTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
3202.73 7990.66 7900.00 59 2
3394.96 8090.66 8000.00 58 6
3581.42 8190.66 8100.00 57 44
3774.59 8290.66 8200.00 60 8
3976.31 8390.66 8300.00 59 36
4169.19 8490.66 8400.00 57 35
4349.86 8590.66 8500.00 55 51
4527.49 8690.66 8600.00 55 44
4704.79 8790.66 8700.00 55 42
4881.64 H890.66 8800.00 55 33
S 31 17 W 9778.10
S 32 46 W 9939.79
S 34 40 W 10093.83
S 37 55 W 10253.68
S 39 15 W 10421.28
S 41 23 W 10577.81
S 44 27 W 10717.92
S 45 59 W 10852.74
S 47 37 W 10985.31
S 47 57 W 11116.24
0.56 9297.28 S 3084.55 W 9795.60 S 18 21 W
1.63 9436.91 S 3170.88 W 9955.39 S 18 34 W
1.94 9568.00 S 3257.94 W10107.46 S 18 48 W
1.78 9700.92 S 3356.10 W10265.05 S 19 5 W
0.96 3837.64 S 3465.62 W10430.23 S 19 24 W
2.31 9963.74 S 3571.90 W10584.64 S 19 43 W
0.81 10073.53 S 3674.73 W10722.86 S 20 2 W
0.81 10177.15 S 3778.74 W10856.02 S 20 22 W
0.52 10277.21 $ 3885.61 W10987.22 S 20 43 W
0,48 10374.94 S 3993.88 Wl1117.13 S 21 3 W
5059.05 8990.66 8900.00 55 5Z
5237°20 9090.66 9000.00 55 50
5415.17 9190.66 9100.001 55 49
5430.00 9199.00 9108.34 55 49
S 47 39 W 11247.91
S 47 11 W 11380.89
S 47 10 W 11513.85
S 47 10 W 11524.94
0-61 10473.37 S 4102.44 W11248.17 S 21 23 W
0.28 10573.22 S 4210.93 Wl1380.90 S 21 43 W
0.00 10673.34 S 4318.6B Wl1513.96 S 22 2 W
0.00 10681.68 S 4327.68 Wl1525.07 S 22 3 W
SCHLUMBERGER
D I REC T I ONl:qL SURVEY
COMPANY
BP EXPLORATION
WELL
W-9 (41-32-11-12)
F I ELO PRUOHOE BAY
COUNTRY USA
RUN ONE
DATE LOOOED 28 - JUN - 89
REFERENCE 73389
~ELL' W-9 (41-32-11-12
437' SNL, 1194' WEL, SEC
21, TllN, R12E)
HORIZONTAL
PROJECTION
NORTH 4000 REF ?9989 SCALE = 172000 IN/FT
.-.L.i...!-..h..~...~....i....i..i...t..:....i.-i....i..L..h.!-...-h..~ ....... ~....i....!....!....!...i i..!.-.i ........ ~...!....!....i....i....i .!i~ .i...i....L..!..-.!...~ ! i t..!iii:!:':.:F :i'll :'i!ii iill i ~" ~ I i i"~ i, 'i ' ;"~
'-!'"'!-"i'"~"i'-'!'"i'"'!""~'"L"!""i""!'"iS'"'i'''i'''!'''! ....... ;----!...>-.-!---~--.-i--.~---;---i ....... ;-.--i---~---!.---!..-i---i....!---.i ....... i-.-.i...i..-.i.4---~/.i--.!--t ........... i.i. ! ..........
~-~-i- i i i4~--+--+-+- i i i i :~ i i i ~ i i i i i i i ! ~ ~ i i ~-+4~-+---~-F--74-;-+-+---, ..... ----? ..... ~.-~..-~ ....... m~.-i.---~ ...... ~.-~.4- ....... ,~
.... !--.-¥--!----! ....... ! ........ !..--~ ....... !.---!----!----!..4 ....... ?---!--4 ...... i ........ ~....! ........ !....! ........ i ........ i.---~--..~..--~ ......... ~....i.4....u.~.....i....~....i....~....~....i..4..~....~ ...... i....i....i...c..L:_:_ ~ ....
.... ~..--!----?----~ ............ ~--.~ ......... ~-?-~ ...... ,-..i----:--~ .... ~-.,--.'~--:-..~-.--:-.-:---:--~ ........ ,..~.-..: ~.-.-.~---.~..:,---~ ...... ~..~---,..-~--~-.-,-:;.--Fi..-~ ~-, ~..-,-~.~. :.~ ~ : ~, ' .... : ...... ..
-'-?--'f'"'F"'?"t"-T--'-F"?"-'.~ ....... ?-'-?---v---:-' ?r-'?"--r-'~' ........ r '- -"--v--?'.-T---.~--.-.~----.:-.---.~ ....... ?---'.~---v--v--'i'--- ?---v--?-'--: ....... r"-r'-'r--v--i' ........ r-.?.-.-.~ ........ . ........ .'"'F -l'-" ...............
i ...;...~.....L--~.....L-..F...F...F..-~ ....... F..~...-.~.....~...&...~...~...-~....~ ........ i...-L.~....L..~....i....i ...~.-4 ....... ~...~....~....~...i....h..~...i....~...~ -...L..; ........ ,...-L...L..~....L-4..
.... :..-.i..--i.4-.4.-F.~.--~.4 ..4..4.4...~.4...>.4..-F.~ ....... i...;-...~....i.4.:,...;,.i...Lz ~i...L..L.}...}...;...i....;...2. :....i...}..../..L::.",.-..;.-L,L.-,..:.i:,...¢.-:.:_.~C..]:..;-::.:..L..} ....
:...;.4...:,.4..-;...~..-;4 .... i...~-.-.L-./;-...~-...i-....~.-.-~-.,t
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::?.i...~...i..i...?...!...!...? ...... !-'"!---+'---!"-!--.+..-.!...h! ....... ~-.-.~--.-~.--~.-~.---~-.-~--..~.-. ~..-
?---':'---?---?.--i--.--P.-?----:----~ ........ ~"'?"'?'"?"".~---?'"?'"'P"7'-'~ "-?'-'-~"'?---? ..... '-'-P--? ........ ?-'-'? ....... ? -'? ....... '---?----P"? ....... ~ ....... ~..-?--.? ........ ~-~.~.~..~--.I. ........ ; ...............
-+-+..~'---~--+.+-~.---~--~ ...... +..-+---'K-~--+-.-~--4---4---~---!---~---~--~.-4-;----~-~.--~.-~ ...... >...&.~....~..4-'...L.~.....~...~. ....... .L..LS--.L..;_~..4...~...,¢..-;...~....&.&.~.....~...~..-.L...~ ..... ~....&4....~....~....~....~....~..~ .....
-4-.~..g..-~ ......~ ~.--~.--~---~ ...... ~.--¥--~---"-.-4-.-~-.-~-.-~-.-~.....-~.-.~...~...;...L.~...~...~..-¢ ....... ~...L.L-~...L.4...L.~...~ ....... &.~-L.L.i.4...~._~I$ ...... L.:;...&-&.~...L.L.~...; ....... L.&.:;...L.'~...&.~...~..4.. 44
._y..T..?...?.....~._y..?...?...? ~ ~ ~ ~ i i ~ ~ ...... i i ~ ~ i i i i i ! ~ ~ ~ i ~ i ~ ~ i i i i I :: :: ~ ~ ~ !il ~ ~ : l"';'";
"-i""?'?"i"'t"-i"'.i"'f---i ...... i"'-?"!'"'h?!'--~'--i':-'---?--"h-~---~----!.---i--+--?--~ ....... ~-.--i---~---?:.----i---i-.+-+-.?:: ...... ..;'--.~.--?."-.-.hF.~.--:-f-?:."'~ ....... ~----.:-.-i-..+.+.-i...?-.-i.-..! ........
---.y'-?---t---.:---t--.~----.:--".:'----.~ ....... .:---~----.~----.~-..-~----:---!----:--.~ ........ :--~----~--.-?--~:----~--.-.'.---.-~----? ........ i-.-~----~--.->+--~--+-+---i ........ ?---?.'.--+---.>+---~.r~...~-.-~ ........ >--i.--~..-.~-.+--~...->+-~ .......
--+--?.-+-.?--.--+-.3..-~--~ ....... +--+-+-+..,.-+.+.+..? ....... ; ................... ;-.-; ....... , ...... :-..,...,.4...I...~...:...~...~ ....... ~...,...,'.-.~...~...I}...~ ....... ,...~...~...4.+.~...:...:...4...J
"-.~"T".?F'I"-!"'v'T"?"' :"~"":"'?"?"T'":"?":"'? ....... .+'"?"'hT'T"?--?'"f"~ "+"i''+''.~'''''''~''+''~''''i ...... ~'"~"'~""?"i" :''''''~ +"~ ....... .~'"?'"+"'>'f"~"'+"'+"'~: .......
.-4.-4.-.4-..4.4.-4..+..+.--~... :...~...~...~-.-4..-~--..~...>.4...4 ....... F.4...4..-4.4...4.4..-4.4...4 ..4.4...4..-~. .4.4...~...~.4 ....... -~...~ 4...~.4.4...1.4...~. ....... ~...~...~...~...~...~...~.4....i...~
-.4-4.-4-+-+-i.--.,-4--4 ...... 4..-~-4...4...4...4---+-.-4--4 ........ 4---~...+...4-4..4...4...4.--4..-4 -..:.,-..4-4-..*.-~...4...4-.F.4 ..... ;.~..4.~4~4~4-4.$...~.~i~ ~4.~.~.~.4.~.~.4-~.~.-4 ..~.~..4..~4~.~.~.~ ......
'~g::l ? { :i~z , i Li i ~ ~ i i i? i i i i [ i i ~ ~ - -?.-.~...-.-i ......... i i ~ ~ .1...i. ~ ~ ~~_r..,...t..v..r..: ...... r"?'"?TV",'"i/'V"..*'"~~l~ ...... ~I ...1.. ~ ~ ~ ~ : ~ ~ ~ ~
: , ~ ~ ~ ~ i ! ~ ~ , ~ ~ ~ ~ ~ ~ ~ :,."'r"rv",."'~'",.'".,"'~"'r'"!'"r"?V,.'",.'"?'"?.
---.~---:?-r---...'---?.---?.---'::---!----:-':--?-'-r---:---:-:--...- ....... !----?--.i---~-++-+.+-+--i--+.-?'.-+-+--~--+-+.+---? ....... ~--+..-~'-++-~--+-+-..~ ....... ~-.+.+-+..~..+-+.+--~ .......
.-~.--;.-.;...;..4.-~.-.,.--;.-.4 ....... ~.--;...;..-;..-;.-.;-..~.-.;...; ....... ;...~...~...~._.~ ~ ~ ~ i ~ ~ ~ ~ ;...~...i...~...~ ...... 4...~...~..-L--L.K...i=I/'~'~.-L-.~...~..~ .;...~..~...~...~ ......
~'T'T'T'T"!"T'T'T'T"!"T'T'T'"i"T'T"F'.::"'i ....... :T".:"?'?"?'i"'~ ...... ?'t'"i'"?':t."'?'t"?"t ....... ?";/'i"?"!f?"?'?'";: ....... ,t'"i"'?'.t'"!'"i"'i'"?'i'"i"';"T"?'!-?T:
.-4---i-4'.-.4-4.-4---.i.---i---.i ....... i----!----i----i---~-.-i--.-i----i--.i ........ i..-i....i..-L---i..-~....i....i...-~ ...... .L.~...L.L.L.~...L...i...~ ....... L...L.L...i...I..L..L.i...~ ...... L.L.~...L...i....i....i...L..i ......
-i.-:4.--~.--4---.i-F--;----L--~ ....... .~....~....L..~....L..~....L..L.~ ....... -~...;...-L...L..L.&.L.?. ....... L.&..L..L.L-.i.-.L.L..~ ...... ~ -..L-L.~ ..... .L: ' ' ......&.L.L.2..L.2..&.~....~ ...... L..L..L..i...
-4...-.'-.,'-.~4..-~...~...~-.~ ....... ~..:...~.44...~...m...~ ....... ~...~...~...~...:.4...~...~...~...~...~...~...~...:...~.~.~...~...~..~...~.~.~.~...:~:.:7.~.....~...m...m...~...~...~...~ ....... ~...~..:...i...L~...~...~...i
· .-.:,...~...~.-..~..4....~....i..--i..--i ....... ~...L.-i....i...;:....L..i....i....i ........ i....;...~...L.L.~...L.~...~ ....... L.L.L-L-i..-L..i...L..i...4 ..~...L.L...::/..L.;....i...L.~ ....... L.L.Z.L.~ ....... L.;.4...
· -i--'?-?'?---{--?---i---?-:..' ...... ?'---.?:--':-i--i---?-'?':?: ....... ?-?-?--?-f--?-?-?-~ ....... ?i---?-'.?1-'-?'-..:'---?-t-q'--.:>?'-t/--'.aoe0'"~ ....... ?'-t--':i-"i--':-:'t-"t .......
:::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::
:??'?i"?'??'"i ....... ?'f"f'-!"i"i"i'"'hi ...... -i-'--i'--i--'+.--!-.-f---!--i-.-~ ...... !.--!--f--~--i--!--U--i.--~.--!..i.i--~±52--i---! ........ i...¢.--i...!.-.h!...i--.+.-i .......
?----?'-?'----P-.v---..'--+---!---..~ ........ ?.--.!----h---F---F---~----h---i---.? ....... i-.-i---3.--~.---r---.~.--.~-..-i-.-~ ....... ~-'-~---~-.-~--4---..~.--~-.-,.'-....; ....... ~'---~-~.---i.---r--~...-?--~-...!.-.4 ...-h-..~..+...i..... · -!..--h-? -.~ .....
1.4...4....L.4..4-.4...,L-;~....~ ....... ,i.-.~.--L...L..L..,L...L..L..~. ...... .L...L...L..L..i..-.L...;-4.,.~. ....... ,L...L..~.....L..4....k,.~_.L..~ ....... ~..~...~..4-4...;'...~...~...~-4...~.-.;.-.~...~...i...~...;...4..-i ....... 4...;...;...~...1...~...~-4-.~
-4-.-4-.4.-4-4.-4.--4.-4--4 ....... 4.--4.--4...4-.~.-.4...4...4-..~... t...4-..4..4..-F.4...4.4-4-4 ....... 4..4..4...4.4.4..A.-4--4 ....... 4/4.4...4.4...4...4.4.4-4...;...;.4...4.-.4-.-4...4...;.-; ....... ;-.-;-.4-.-~---F.4...4-.4...;
:"i"-H"i"-hf"i--'i ....... !-"!'"-b?i'--'i"-'bi'-'~ ........... i"i"-'i"'f'i ....... i'--i ....... i"i"i-'i"i'"2"i"i"i'"'/"i'~'~"'f"f'i ....... !---!'"~ ........ [--f'-~ ..................
--;---4---4---;---4,---;---4---;.--; ........ ;---;---4----~---4---.;.--4---4--.-;..- h--4---4---4---4---4---4-..4---4--.4 ....... 4---4---4..-4--.4./-4.-.;-.-4---4---. r---4-.-4---4.-.4---4--.4---4---4---.;-.. ~.-.-~..--;.--4.-.-;..-;..-.;..--~...-;-.-.~ ...........
-+.--F+..+..-4..-h--.+....F--i ....... 4...+...3...+..-F.+--.+...F..P ;...F.-i...+..-+...3-..~.-.i-..4...i ....... !-4.4...4-..-.., .4~L.i.-.4...!-..~ ..... 3..-4...4...4.4...4.---i...i...i ....... i...;-.4...-i...i-..F-+..-.;..--3 ........
'-i"'?'?"i'"i""h?"?'~ ....... 'P?'?'i'"??'?"?"-..:-"-i'--?--?--?-'v-~---?-v-v'i ....... v.v-~--i/}-.--i---~--.t.-./-..-H~oe-+-.t---vi--.~ ....... ~----i..-i....+..+..:..:.i-..~ .......
--r--??---??..-.r--v---r--? ....... v--?-r--?---~---?-?? ....... ,--.r--?---?.--~--4-.-?---~.--~----~ ....... 3-..3...+---~---~---~---+.--3-~--. ---~--'3'--~---~---~.-'*.: -'.3'..~-..~ ....... ~---~---3.--+.-.;. ....... + ...............
-~..-.;-..4...;--. '--i.--.;.-..;...~ ....... ~.-.-.;---~....i-...~....L..z.....;...-~ ...... ;.---;..-.L--;-' ---~.----;-..~..-4 ....... 4...~...-;/~-., -.~...~-L-4..-.; ..... 4. ....... -;.-.4.-.~....-;... '..-4...~...~....$ ....... .;....;...;...?...~, ....... ,....;...; .......
I''~'II'?'II~*'''~'''I ''''~''''?'''~''''~ ........ ~I'''~''''~*I'I?'''~''''~''''~''''~'''~*'' :'''I~''''~'I'i'''~'''~I''i'''iI'**~'I*~ ....... ~""!"'~'".4"4'"~"'~1~'i"'!'kC .O~O"~"'~'"'?'"'~'"-i""~' "i ....... :: '" i""!'"'~""!""~'"'!'"'i""! ....... i""i" ':' "!'" h'"?'"?"'!" '~ ....... ~""i'"'!'"i"'l'"'? '"~ '"i""i-
;.--;...;...;--.4...;....'.,...;...;....; ....... ;.-.;..-;..-;....;.--;.--;-.-;-...~ ....... ;...;--.;-..;--4...;..4...;....~ ....... ~....-;.~/.L-L-J,...-;?2]~]],.L..-; ....... -;....F..~- ....... L..-L...F..~ ............... ~...,~ ....... ~. ............... : ...................
.... i.4 4.4 4..-i.--i...i.4 ...... ~.~...i 4...;..-~.--;...i ....... !...i...44-.i4...",744 ....... :/ ~.4...4.~.4..~.~uCt.. ,..i...i...i...i 4...; ....... ;...;... :...i...~ -.;.... ..% : :.: :. :::.::,.
.--.L.-.;-...~....F..~....;....h...~...,; ....... F-..L...;....~.....i....i....~....F...i ........ F.-.~-.-.~.-.~.-.L...F...L...;...-~ ...........~....-..1_~]]~..4.-:; ..-L.-.;..-.;...,~....~ ........ L..F..~....~....i....~....i...i...~ ....... ~..i .L :..4.; .L i ~
.... ~..4...L..~....i..-.;....L...L.-L-~..-.L..-h..L..L...L..-L..L..L..~ ....... L--!,....L.L.L..~....L.L.~ ..... ~...~...~ ....... L..L.L..L..! ........ h..L..L...i....L..?,..4..~ ....... :,....L...L..i...i.._'.. 2_./. '~
.... L.L..~..-.~.-.~....i.-..i....i....i...~...L.L..i.-..i...I.-..L.L...i....~ ....... L..i...&.L.L.L.-~-..-L..L.~-L.4~.~t.~Ii~OO...-i ....... L.L..;....!....i...i..~...&..i ....... i...~....i...i...t. ~..~ ...... t"; '~"'-~ ~"'~ ........
---?-~--'f---i---,---'t---!---i---! ...... i----h--!---'!---t----?"?'--f---~ ...... f---f----!---i ....... ~---i----!-:~'--->l-~'--?--'i---.+--'-~ ....... ?-!---f-'-'h--!'"-!-'--!"-f---+ ........ ?'"!" !-"'i'-"!- "!'" >' ') .... t '!' '! ..........
--F--~---+.---F-+.--?.--4-.?.-.+ ....... P.--F--;-.-;----h--;..-..~-.-.~--.* ........ ~.--;.--.;...;.-4 .--.;--.-;-..-~---4 .-~4~1~1;...;..-;..-;.--;..-.~---4 ..--;-...~--..~---.;..-;.....~--.-;.-4.. 4 ....... ;....~....;....;.. 4....;....;.. 4 ....... ;
.... :,.-.;-.;..-;..4....:....~....;.....~ ...... 4...;.--;....i.4-.-L.;...L..i ....... L.~...~..-S.~..-~..-~.-.;.-4-.:": . :..;-..;...;..-'-.,'"...i....L.~...L..i....-.L-L.~..;-..4.-.;....i...L-.~ ....... i....;...;. ~.-4...;.. :,.. ;.. ;. t.4...;..i-4--; ...... ,-~-,-4-~-.;--~..i-4-.; 4..;-.
: : : : ' : ; : : : : : : ,,!. ; : : : : : : : : : : : : ~ : : : : ~ : : : : : : : : .~ ............
.... :L..~-..~...3-..L...~...~.--~...~ ......~ ~ ..3...~..-:;...~--.~.--~...3...~ ....... ~..-~...3.-.3..-.L-.3....L..~...~- k-.~...~...L.-L--.L..3..-.L-.~...3..- L-.~...3...-F.--F..~' ...~..--i-.~...L..: ....F...i...L...~-.,L...;... ;....~....~ ...... :..L...~...~.. i ...:... i....i.-.i...
-4-~..-~-.~-4.-LS--L.~-FS.4.4-LS...C.~-~-~ ....... ~-.,."-~.4-$4.4.4-; ..... ~-.;-,~-.~..4...C.~...~...; ...... .i..C.~...~4...~....;.4...; ...... ;....i...~...~...L.i...;..4...: ...... ~...~....~..4.4...i....i...~...~...
....... -:---.: ........ ....
zooo
O
-2000
-4000
-6000
-8000
-1
SOmH -~20o~
-I0000
~EST
-8000 -6000 -4000 -2000 0 2000 4000
6OOO
EAST
~ELL ·
~(1437'
W-9 (41-32-11-12
SNL, 1194' WEL, SEC 21',
T11N, R12E)
VERTICAL
PROJECTION
20.
-2000 0 0 2000 4000 6000 8000 !0000 12000
4000
200.
PROJECTION ON VERTICAL PLANE 200. - 20. SCALED IN VERTICAL DEPTHS HORIZ SCALE : 1/2000 IN/FT
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO
ARCO
EXXON
PHILLIPS
STATE OF ALASKA
,
Date: 24-JUL-89
T~: 80200
SYSTEM Tape & Transmittal Only
ARCHIVES
BP MAGNETIC LIS TAPE & LISTING
The following material is being submitted herewith. Please acknowledge
receipt by signing a copy of this letter and returning it to this office:
W-09 OH/MWD 24-JUN-89 #1 14635-15432
SPERRY~89-06-09AK 1600bpi API#50-029-21947
Z-23 OH/MWD Il-JUL-89 #~ 9125-9808
SPERRY#89-06-11 1600bpi API#50-029-21950
Tape Pos.#06537
Tape Pos.#06538
Received:
Date:
Information Control
Well Records LR2-1
J. Dietz/S. McCurry
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO
HOUSTON
ARCO
CHEVRON
EXXON
MOBIL' ,
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
ARCHIVES
Date: 07-10-89
T%: 80155
BP CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge
receipt by signing a copy of this letter and returning it to this office:
W-09 CBT 06-28-89 #1 14350-15310 Sch 5"
W-09 CET 06-28-89 #1 14350-15310 $ch 5"
M-22 COMP' 06-27-89 #1 9562-10492 Sch 5"
W-09 GR/CCL 06-28-89 #1 14085-14875 Sch 5"
Received:
Date:
Information Control
Well Records LR2-1
J. Dietz/S. McCurry
BP EXPLORATION
. .
kRC0
E~f0N
PH~L~S
STATE OF AK
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
PO. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
Date: 07-10-~9
TS,: 80154
SYST~ (Transmittal & Tame)
ARCHIVES
BP MAGNETIC LIS TAPES & LISTINGS
The following material is being su~tted herewith. Please acknowledge receipt by
signing a ccpy. of t2%is letter and returning it to this office:
W-09 OH/DIL/BHC/CNL & CASING CNL/GR 06-22'89 #1
11296.5-15.459.0 API# 50-029-21947 SCH REF# 73383
TP#06517 'BPI#1600
947
* E~I[0N: An Asterisk (*) next to a listing above means you should
have received the Tape(s) and Listing(s) directly from the respective
service company. Please confirm this.
Received
Da~e
Shirley R. McCurry
~ON CD~VLROL
~R2-1
~,2y 19, 1989
Telecopy:
(907)276-7542
J. G. Vidrine
Endicott Drilling Engineering Supervisor
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Prudhoe Bay Unit W-9
BP Exploration (Alaska) Inc.
Permit No. 89-54
Sur. Loc. 1437'SNL, l194'WEL, Sec. 21, TllN, R12E, UM.
Btmhole Loc. 1454'SNL, 663'WEL, Sec. 32, TllN, R12E, UbI.
Dear ~r. Vidrine:
Enclosed is the approved apptieation for permit to drill the
above referenced well.
The permit to drill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and
does no~ authorize conducting drilling operations until all other
required permitting determinations are made.
To aid us in scheduling field work, please notify this office 24
hours prior to commencing installation of the blowout prevention
equipment so that a reprasentative of the Commission may be
present to witness testing of the equipment before the surface
casing shoe is drilled. '-Jhere a diverter system is required,
please also notify this office 24 hours prior to commencing
equipment installation so that the Commission may witness tasting
before drilling below the shoe of the conductor pipe.
Ve~Z' trut~~ur§,
C. V. Chatterton
Chairman o f
Alaska Oil and Gas Consarvation Co~iasion
BY ORDER OF THE CO~.~4ISSION
dlf
Enclosure
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
May 11, 1989
Alaska Oil & Gas Conservation Commission
3001 Porcupine Dr.
Anchorage, Alaska 99501
Attn' Mr. C. V. Chatterton
Well W-09 (41-32-11-12) PBU
Enclosed, in triplicate, is form 10-401, our Application for
Permit to drill the above-named well. Also included are the
attachments noted on the permit form and our check in the
amount of $100.00 to cover the permit filing fee.
Yours yery truly,
~rilli'ng Engineering
Supervisor
JGV/KTH
CC'
Bill Kirton
Well File
' STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill [] Redrilll"lllb. Type of well. Exploratoryr-I Stratigraphic Testr"] Development dilL]
Re-Entry [] Deepenl-II Service [] Development Gas [] Single Zone [] Multiple Zone[]
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exoloration KBE = 92 feet Prudhoe Bay Field/Prudhoe
3. Add'ress 6. Property Designation Bay Pool
P. O. Rex lg6612. Anchoraae. Alaska ~519-6612 ADL 47453
4. Location of well at surf~.ce 7. Unit or property Name 11. Type Bond(s,,e 20 AAc 25.025)
1437' SNL, 1194' WEL, SEC. 21, T11N, R12E Prudhoe Bay Unit
At top of productive interval 8. Well number Number
1200' SNL, 550' WEL, SEC. 32, T11N, R12E W-9 (41-32-11-12) 2S100302630-277
At total depth 9. Approximate spud date Amount
1454'SNL, 663' WEL, SEC. 32, T11N, R12E May28, 1989 $200,000.00
12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(UDandmVD)
, property line
ADL 47452 / 663 feet W-lO 24 feet 2560 15286' MD / 9153' TVDfeet
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2))
Kickoff depth 500 feet Maximum hole angle57.4E Maximum surface 3330 pslg At total depth (TVD) 8800'/4390 pslg
18. Casing program Setting Depth
s~ze Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD M D TVD (include stage data)
20" Cond. 80' Surface 110' 110'
17-1/2" 13-3/8" 68# L-80 Butt 3229' Surface 3259' 2680' 4500 cu fl Permafrost
12-1/4" 9-5/8" 47# L-80 NSCC 14446' Surface 14476' 8717' 32/2 cu fl Class G
8-1/2" 7" 26# L-80 IJ4S 1060' 14226' 8582' 15286' 9152' 350 cu ft Class G
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured deptli~ ~/,? l~'llu~'~l~al depth
Structural
Conductor
SurfaceMAY 1_ ~
Intermediate
~~ & Gas Cons,,
Ccmmissi0n
Production
Liner "'-~-',' =' "-' :~~'~,....~cll0~rage-._. ~..,~...
Perforation depth: measured
true vertical
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program []
Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[]
'~2~1" I herebycertify/] t,h~t t~ foregoing"*' / ~7'_~,,..~.~ is true and correct to the best of my knowledge ~--~9--/~/o
Signed ~/, ~ Title Drilling Engineering Supervisor Date
/~" - Commission Use Only
Permit Num~ber ~ . IAPI number IApproval date ISee cover letter
-5'¢ 15 o- × I z 9 / 9 If°r other requirements
Conditions of approval Samples required [] Yes /,'1~ Mud log required []Yes'~'No
Hydrogen sulfide measures [] Yes ~_ No Direction.al survey requ~recl ~['Yes [] No
Required working.,Frg"4sure,,Ior~ [] 2M; CI3M; [~,5M; I--11 OM; []15M;
Other: ///-"") ~/~//~ ,,~,~' ~' .- by order of
Approvedby ( ~"'-_/Z(~,~-,~~~,) Commissioner ~necomm,ssion Date
Form 10-401 R
Submit ir~
PROPOSED DRILLING AND COMPLETION PROGRAM
,WELL W-9 [41-32-11-121 PBU
Install and cement 80' of 20" conductor to surface.
The Drilling fluid program will consist of an 9.5 ppg spud mud in the 17-1/2"
hole, a 9.5 - 9.7ppg water base mud in the 12-1/4" hole and a 9.6 ppg water base
mud in the 8-1/2" hole. KOP will be at ~00'.
Directionally drill 17-1/2" hole to 3296' MD and cement 13-3/8" L-80 Buttress
casing to surface.
Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams,
blind rams, and annular preventer. Maximum possible bottomhole pressure is
4390 psi at 8800' TVDss based on original reservoir pressure. Maximum
possible surface pressure is 3330 psi based on a gas column to surface from
8600' TVDss and an oil column to 8800' TVDss.
Directionally drill 12-1/4" hole to the 9-5/8" casing point 10' below the Sag
River Sandstone. Run 9-5/8" 47# L-80 NSCC casing to within 5' of 12-1/4" TD
and cement using Class G cement around the 9-5/8" shoe.
Directionally drill 8-1/2" hole to TD. Run 7" liner from TD to 250' inside
9-5/8" casing shoe and cement using Class G cement.
Clean out to 7" float equipment. Change over to 9.6 ppg. filtered NaCL
completion fluid. Test casing and lap to 3000 psi. Run CET/CBT/CCL-GR and
GYRO. Perforate with Schlumberger.
Run 9-5/8" production packer on 3.5" tubing with a sliding sleeve. Set packer
50' above top of liner. A subsurface safety valve with dual control lines will be
placed 50' below base of permafrost. Install and test' Xmas tree. Displace tubing
to diesel. Set and test packer.
Tubing Size: 3-1/2", 9.2# L-80 TDS TBG with GLM's.
Tailpipe Size: 3-1/2" Tailpipe
NOTE: Perforate with rig on location
BK:4-21-89
PROPOSED DOWNHOLE DIAGRAM
WELL W-9 [41-32-11-12] PBU/EWE
PROPOSED DEPTH
BKB
20" Conductor
Ball Valve
110'
2100'
13-3/8" Casing Shoe
17-1/2" Open Hole
3259'
3275'
3-1/2" 9.2# L-80 TDC tubing with GLM's
9-5/8" Packer
14176'
7" Liner
14226'
9-5/8" Shoe
12-1/4" Open Hole
14476'
14481'
7" 26# L-80 IJ4S Linei
7" PBTD
7" Liner Shoe
8-1/2" Open Hole
15246'
15286'
15286'
4-21 -89
B.O.P. STACK CONFIGURATION
13-S/~g IN. TRIPLE RAM STACK
S000 PSI WP
DRILLING
ANNULAR
PREVENTER
I 1
PIPE RAMS
, I 1
I
BLIND RAPIS
I I
2 IN. KILL LINE k
·
GATE GATE [
DRILLING
SPOOL
4 IN. CHOKE LINE
l
GATE GATE
!
PIPE R Ar'IS
1 L
I
NORTH
WELL N' W' 9
_
~UR FACE LOCATION
0 i
LAT. z 70 17 47. 187
LONG. · 149° 05' 33. 569"
Y · 5, 958, 820.04 A.S.P.
X · 612 , 049.08 ZONE 4
1437' FROM N. LINE SECT. 21
1194 ' FROM E. LINE SECT. 21
I
(MILES
CERTIFICATE OF SURVEYOR:
I HEREBY CERTIFY THAT I AM PROPERLY
REGISTERED AND LICENSED TO PRACTICE
LAND SURVEYING IN THE STATE OF ALASKA
AND THAT THIS PLAT REPRESENTS A
LOCATION SURVEY MADE BY ME CH:[ UNDER
MY SUPERVISION, AND THAT ALL DIMENSIONS
AND OTH.ER DETAILS ARE CORRECT.
SURVEYOR DATE:
WELL PAD'W'
i ii
WELL N° W- 9 AS-BUILT
LOCATED g~
PROTRACTED SECT. %1 , T. II N. , R. IZ E., U.M.
SURVEYED FOR :
~Jlld~Jj)~i.l~ ALASKA I~ODUCTIOr,,, ~C
PREPARED. IY ;
KUUKPIK -
TECHNICAL SERV. INC.
PRUDHOE BAY OFFICE
DATE , NOV, 15,8E
Dtq. AWN BY: B.T.
JCH KD. BY; R.H.
WELLS WELLS
130' 130'
w~$ 0
W36
W39
W40
WELL PAD "W"
SCALE I": 400'
T. Ii N.,R. 12 E.,U.M.
W24
WZZ
W?.!
W20'
WI7
WI~
WI4
REV. 8 102/88 JJC
REV. 5115/88 JJC
17.108/87 JJC
16 15
21 22
~ OF WELL PAD
LEGEND
· EXISTING CONDUCTOR BOX
e FUTURE CONDUCTOR BOX
(AS STAKED) i
PAD "W" ,'
Loc ated in !
PROTRACTED SECTION 21, T. I IN.,R.12E.,UMIAT MERIOIAN,AK. i:
Surveyed for :
STANDARD ALASKA PRODUCTION CO.,
Surveyed by
KUUKPIK TECHNICAL SERVICES, INC.
ANCHORAGE, ALASKA
(907') 561-5257
_$45DUA124:[DRAN029]W9_CLOSAP_SHORT.LIS;1
Search Radius= 200 COURSE LINE
For proposed well: W-9 [41-32-11-12]
Location = W-E S-N TVD(SBS)
Top 612049.00 5958820.00 -92.00
Bottom 607531.10 5948291.41 8980.00
Note: Ail depths in feet Below Kelly Bushing (BKB)
19-APR-1989
--- Closest Approach Analysis ---
Date: 19-APR-89 Time: 09:52:44
09:53
Page
Closest Approach
WELL IDENT /PROPOSED% /NEARBY% CLOSEST
TVD DEPART TVD DEPART DISTANCE
A029-2000800
KUPST1 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW
A029-2050400
MP3311 8483.3 10535.0 9016.2 3675.2
A029-2103300
W-T 2120 . 6 671 . 3 2616 . 0 897 . 8
A029-2177600
W-40 1188.3 105.8 1190.8 2.5
A029-2175400
W-39 1093.2 78.1 1095.2 3.7
A029-2179900
W-35 1.2 0.0 0.0 0.0
A029-2180700
W-38 705.0 9.3 699.7 15.0
A029-2181600
W-42 1363.5 169.2 1364.2 5.6
A029-2182200
W-6 500.0 0.0 489.9 2.5
A029-2185500
W-37 575.5 1.6 574.4 1.3
A029-2186500
W-36 500.0 0.0 499.3 1.0
A029-2186600
W-1 500.0 0.0 492.9 2.3
A029-2186700
W-34 301.3 0.0 300.0 0.3
A029-2189300
W-10 1068.6 72 . 1 1057.0 46 . 5
A029-2189400
W-27 898.0 34.8 872.1 132.0
A029-2190700
W-4 400.8 0.0 400.0 0.9
A029-2191800
W-07 500.0 0.0 499.2 2.0
957.0
2981.2
240.1
254.2
317.4
268.7
210.4
69.4
282.4
298.3
278.4
338.3
24.0
628.5
174.6
103.0
Vertical
/PROPOSED%
TVD DEPART
Intersection
/NEARBY\
TVD DEPART
VERTICAL
DISTANCE
1637.1 302.2 5595.1 317.7 3957.7
2222.4 780.7 6452.2 761.0 4230.7
1787.1 396.1 4971.5 318.4 3185.5
SUMMARY
The well which comes closest to the proposed well is:
$45DUA124:[DRAN029]W9_CLOSAP_SHORT.LI$;1 19-APR-1989 09:53 Page 2
A029-2189300 W-10
Closest approach distance = 24.0 feet
KICK OFF for this run = 500.0 feet
_$45DUA124:[DRAN029]W9_CLOSAP_SHORT7.LIS;1
19-APR-1989
--- Closest Approach Analysis ---
Date: 19--APR-89 Time: 09:53:35
Search Radius= 200 7 DEGREE LEAD LINE
For proposed well: W-9 [41-32-11-12]
Location = W-E S-N TVD(SBS)
Top 612049.00 5958820.00 -92.00
Bottom 608847.89 5947819.30 8980.00
Note: Ail depths in feet Below Kelly Bushing (BKB)
09:53
Page
Closest Approach
WELL IDENT /PROPOSED\ /NEARBY% CLOSEST
TVD DEPART TVD DEPART DISTANCE
A029-2000800
KUPST1 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW
A029-2006100
331112 8782.4 11003.5 9100.8 716.2
A029-2048300
MPC TR 8405.7 10413.6 4547.5 829.0
A029-2050400
MP3311 8365.0 10349.9 8348.7 3117.4
A029-2103300
W-T 1895.2 473.6 2365.3 811.8
A029-2177600
W-40 1079.1 74.6 1081.0 1.6
A029-2178400
W-39 954.2 46.0 955.6 2.1
A029-2179900
W-35 1.2 0.0 0.0 0.0
A029-2180700
W-38 601.5 2.3 599.9 8.2
A029-2181600
W-42 1296.9 143.3 1298.1 5.1
A029-2182200
W-6 500.0 0.0 489.9 2.5
A029--2185500
W-37 500.0 0.0 498.9 1.1
A029-2186500
W-36 500.0 0.0 499.3 1.0
A029-2186600
W-1 500.0 0.0 492.9 2.3
A029--2186700
W-34 301.3 0.0 300.0 0.3
A029-2189300
W-10 1124.8 87.3 1113.9 55.9
A029-2189400
W-27 799.1 19.6 773.6 117.1
A029-2190700
W-4 400.8 0.0 400.0 0.9
A029-2191800
W-07 500.0 0.0 499.2 2.0
2413.1
5424.1
1.1
3059.2
251.1
261.8
317.4
269.4
229.4
69.4
282.4
298.3
278.4
338.3
14.4
618.8
174.6
103.0
Vertical
/PROPOSED~
TVD DEPART
Intersection
/NEARBY~
TVD DEPART
VERTICAL
DISTANCE
1877.5 460.7 5118.4 401.4 3242.0
1720.9 352.5 5696.2 381.4 3975.1
8365.4 10350.5 8347.5 3116.5 -2.1
$45DUA124:[DRAN029]W9 CLOSAP SHORT7.LIS;1 19-APR-1989 09:53 Page 2
SUMMARY
The well which comes closest to the proposed well is:
A029-2050400 MP3311
Closest approach distance =
KICK OFF for this run =
1.1 feet
500.0 feet
MUD PITs
RIG 3 MUD SYSTEM
HOPPER
ALASKA UNITED DRILLING INC.
RIG 3 MUD SYSTEM
DRWN. BY
DATE
October 1987
~CALE:
NTS
ApI~OVED
CHECKED
IFILENO
ALASKA UNITED RIG NO. 3
MUD SOLIDS CONTROL EQUIPMENT
1 - Brandt Dual Tandem Shale Shaker
1 - Demco 6-12" Cone Shale Desander
1 - Demco 416H w/16 cones & (1) Demco
48H w/16 cones (Desilter)
1- Tri-Flo Horizontal Vacuum Atmospheric Mud Degasser
1- 200 gpm Operating Capacity Centrifuge
1 9- Brandt MA5 Mud Mix Agitators
1- 125 bblo Trip Tank
1- Recording drilling fluid pit level indicator with both
visual and audio warning devices at driller's console
1- Drilling fluid flow sensor with readout at driller's console
1- Cavium Dewatering screen assembly
MUD WEIGHT CALCULATIONS
WELL W-9 (41-32-11-12)
Mud Wt. (8-1/2" Hole): 9.6 ppg.
P Sag River:
P Sadlerochit:
P Top Sadlerochit:
4138 psi. at 8600' TVDSS
4145 psi. at 8800' TVDSS
4138 psi.
OB Sag River:
OB Top Sadlerochit:
Current GOC:
155psi.
248 psi.
8877' TVD BKB
9-5/8" Casing Pt.
Top Sag River
Top Sadlerochit
8717' TVD BKB
8714' TVD BKB
8860' TVD BKB
Cement Calculations
13-3/8" CASING
Measured Depth: 3259'
Basis: 2 X Annular volume
Total Cement Vol: 4500 (cuft)
Lead Slurry Vol: 2250 (cuft)
Tail Slurry Vol: 2250 (cuft)
9-S/8"CASING
Measured Depth:
Basis:
Total Cement Vol:
Lead Slurry Vol:
Tail Slurry Vol:
14,476'
90% Annular Volume to 13-3/8" + 50 cuft
3212 (cuft)
2627 (cuft)
585 (cuft)
7" LINER
Measured Depth: 14,226'
Basis: 1.5 X Annular volume to 9-5/8" shoe + 200 cu ft
Total Cement Vol: 350 (cu ft)
BK:4-21-89
CHECK LIST FOR NEW WELL PERMITS
ITEM A~PROVE DATE
(2 thru 8)
(8)
(3) Admin ...~/Pd'_ ,5",/~Z,'5"/~r-~/ 9.
(9 thru 1~) ' - ' 10.
(10 and 13) 12.
13.
(4) Cas~ .Z-~.~.f~. 5'-/:- $~
(14 thru 22)
(5) BoeE
(23 thru 28)
Company ~ ~/~,'_r,~) Lease & Well No. /~Z ~Y~ ~:~" P~
! YES NO RLM~ARKS
Is the permit fee attached .......................................... / --
Is well to be located in a defined pool .............................
me
3. Is we~] located proper distance from property line .................. .~
4. Is We-~ilocated proper distance from other wells ................ "... ~/-~
5. Is suz~icient undedicated acreage available in this pool ............ !,,~
6. Is well to be deviated and is wellbore plat included ................ _~_
7. Is operator the only affected party .................................
8. Can permit be approved before fifteen-day wait ...................... ~
Does operator have a bond in force ..................................
Is a conservation order needed ......................................
Is administrative approval needed ...................................
Is the lease number appropriate .....................................
Does the well have a unique name and number .........................
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
Is conductor string provided ........................................ ,,~
Will surface casing protect all zones reasonably expected to
serve as an underground source of drinking water .....................
Is enough cement used to circulate on conductor and surface .........
Will cement tie in surface and intermediate or production strings ... ,-~
Will cement cover all known productive horizons .....................
Will all casing give adequate safety in collapse, tension and burst..
Is this well to be kicked off from an existing wellbore .............
Is old wellbore abandonment procedure included on 10-403 ............
Is adequate wellbore separation proposed ................. , ..........
Is a diverter system required ....................................... ~
,,
Is the drilling fluid program schematic and list of equipment adequate-~
Are necessary diagrams and descriptions of diverter and BOPE attached. ~
Does BOPE have sufficient pressure rating - Test to ~~ psig .. ~
Does the choke manifold comply w/API RP-53 (May 84) ..................
Is the presence of H2S gas probable .................................
(29 thru'3l) '
(6) Add: 'f~,~/~, 5-/~-~?
Geology: Eng~neerin~: ,
LCS :J
rev: 01/30/89
6.011
For exploratory and Stratigraphic wells:
29. Are data presented on potential overpressure zones? .................
30. Are seismic analysis data presented on shallow gas zones ............
31. If an offshore loc., are survey results of seabed conditions presented
32. Additional requirements .............................................
INITIAL GEO.UNITON/OFF
POOLCLASS STATUS AREANO. SHORE
Additional Remarks
/
Well Histo,ry File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIX.'
No special'effort has been made to chronologically
organize this category of information.
oo
(
I~r¡- (9b-4f
( ~<- g ~
Sperry-Sun Drilling Services
LIS Scan Utility
RECE'VED
$Revision: 3 S
LisLib $Revision: 4 $
Thu Sep 16 10:13:58 2004
SEP 2 8 2004
:~ask8 OU & Gas Cons.Comn1I8im
~
Reel Header
Service name.............LISTPE
Date.................... .04/09/16
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name................UNKNOWN
Continuation Number......Ol
Previous Reel Name.......UNKNOWN
Comments.................STS LIS
í'lri ting Library.
Scientific Technical Services
Tape Header
Service name.............LISTPE
Date.....................04/09/16
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name................UNKNOWN
Continuation Number......Ol
Previous Tape Name.......UNKNOWN
Comments. . . . . . . . . . . . . . . . . STS LIS
Writing Library.
Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
W-09APBl
500292194770
BP Exploration
Sperry-Sun Drilling
l6-SEP-04
Services
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 3
MWOO03126704
J. PANTER
C. GALLAWAY
MWD RUN 4
MWOO03126704
J. MARTIN
L. VAUGHAN
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
21
11
12
1437
1194
MSL 0)
79.01
53.30
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
4.750 5.500 14636.0
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE MEASURED
DEPTH (MD).
2. AL.L VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
SCANNED OCT 0 9 2004
(
(
3. W-09A PBl WAS DRILLED FROM A WHIPSTOCK, THE TOP OF
~lliICH WAS POSITIONED AT
14636'MD AND THE BOTTOM WAS AT 14648'MD. NO PROGRESS
WAS tvLD..DE ON MWD RUN 1.
THE WHIPSTOCK WAS SET AND THE WINDOW MILLED ON MWD
RUN 2. NO DATA ARE
PRESENTED FOR MWD RUNS 1 AND 2.
4. ¡~D RUNS 3 AND 4 COMPRISED DIRECTIONAL WITH DUAL
G~~ RAY (GM) UTILIZING
GEIGER-MUELLER TUBE DETECTORS AND ELECTROMAGNETIC
WAVE RESISTIVITY PHASE-4
(EWR4) .
5. LOG AND DIGITAL DATA (LDWG) ONLY WERE BLOCK-SHIFTED
5' DOWNHOLE, PER E-MAIL
FROM K. COONEY (SIS/BP) DATED 26 AUGUST 2004. LOG
HEADER DATA RETAIN
ORIGINAL DRILLERS' DEPTH REFERENCES.
6. MWD RUNS 3 AND 4 REPRESENT WELL W-09A PBl WITH API#:
50-029-21947-70. THIS
WELL REACHED A TOTAL DEPTH (TD) OF
16323'MD/8883'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name.............STSLIB.001
Service Sub Level Name...
Version Number...........l.0.0
Date of Generation.......04/09/16
Maximum Physical Record..65535
FE e Type................ LO
Previous File Name.......STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
RPD
RPM
RPS
RPX
ROP
FET
$
1
clipped curves; all bit runs merged.
.5000
START DEPTH
14596.0
14635.5
14635.5
14635.5
14635.5
14667.5
14667.5
STOP DEPTH
16257.0
16266.5
16266.5
16266.5
16266.5
16328.0
16266.5
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
14596.0
16328.0
$
GR
14591.0
16323.0
#
MERGED DATA SOURCE
SCANNED OCT 0 9 2004
(
PBU TOOL CODE
MWD
MWD
3
BIT RUN NO MERGE TOP
3 14591.0
4 149l3.0
MERGE BASE
14913.0
16323.0
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record......... ....Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 14596 16328 15462 3465 14596 16328
ROP MWD FT/H 0.82 455.84 63.0337 3322 14667.5 16328
GR MWD API 20.24 471.3 83.7056 3323 14596 16257
RPX MWD OHMM 2.08 2000 18.3049 3263 14635.5 16266.5
RPS MWD OHMM 1.69 2000 21. 3242 3263 14635.5 16266.5
RPM MWD OHMM 0.16 2000 24.126 3263 14635.5 16266.5
RPD MWD OHMM 0.1 2000 25.408 3263 14635.5 16266.5
FET MWD HOUR 0.91 32. 71 3.75036 3199 14667.5 16266.5
First Reading For Entire File..........14596
Last Reading For Entire File...........16328
File Trailer
Service name.............STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generatian.......04/09/16
Maximum Physical Record..65535
File Type................ LO
Next File Name...........STSLIB.002
Physical EOF
File Header
Service name.............STSLIB.002
Service Sub Level Name...
Version Number...........1. 0.0
Date of Generation.......04/09/16
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
2
log header data for each bit run in separate files.
SCANNED OCT 0 9 2004
(
BIT RUN NUMBER:
DEPTH INCREMENT:
3
.5000
Jl
7T
FILE SUMMARY
VENDOR TOOL CODE
GR
RPX
FET
RPD
RPS
RPM
ROP
$
START DEPTH
14591.0
14630.5
14630.5
14630.5
14630.5
14630.5
14662.5
STOP DEPTH
14841.0
14851.5
14851.5
14851.5
14 851. 5
14851. 5
14913.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF}
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefíned
Abs ent value...................... - 9 9 9
Depth Units.......................
Datum Specifícation Block sub-type...O
27-JUL-04
Insite
4.3
Memory
14913.0
14662.0
14913.0
55.5
61. 0
TOOL NUMBER
82758
178425
4.750
14636.0
Water
8.50
47.0
8.7
6100
.0
.480
.180
.350
.520
Name Service Order Units Size Nsam Rep Code Offset Channel
Based
62.0
179.7
62.0
62.0
(
SCANNED OCT 0 9 2004
(
f\
DEPT FT 4 1 68 0 "
..L
ROP J:vfWD030 FT/H 4 1 68 4 2
GR Mí\lD030 API 4 1 68 8 3
RPX M"wD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD l"fWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 14591 14913 14752 645 14591 14913
ROP MWD030 FT/H 2.31 72.13 25.2892 502 14662.5 14913
GR MWD030 API 44.9 471.3 151. 784 501 14591 14841
RPX MWD030 OHMM 2.08 2000 64.0486 443 14630.5 14851.5
RPS MWDO 3 0 OHMM 1. 97 1780.24 54.5426 443 14630.5 14851.5
RPM MWD030 OHMM 0.16 1139.34 47.3012 443 14630.5 14851.5
RPD MWD030 OHMM 0.1 1943.81 92.8918 443 14630.5 14851.5
FET MWD030 HOUR 2.28 5.62 3.9472 443 14630.5 14851.5
First Reading For Entire File..........14591
Last Reading For Entire File...........14913
File Trailer
Service name.............STSLIB.002
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/09/16
Maximum Physical Record..65535
Fi 1 e Type................ LO
Next File Name...........STSLIB.003
Physical EOF
File Header
Service name.............STSLIB.003
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/09/16
Maximum Physical Record..65535
Fi 1 e Type................ LO
Previous File Name.......STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPD
RPM
RPS
RPX
FET
ROP
$
3
header data for each bit run in separate files.
4
.5000
START DEPTH
14841.5
14852.0
14852.0
14852.0
14852.0
14852.0
14913.5
STOP DEPTH
16252.0
16261.5
16261.5
16261.5
16261.5
16261.5
16323.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
30-JUL-04
Insite
4.3
Memory
16323.0
SCANNED OCT 0 9 2004
(
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
(
14913.0
16323.0
62.2
100.4
TOOL NUMBER
82758
178425
4.750
14636.0
Water
8.60
44.0
9.0
6000
8.7
Based
.500
.180
.600
.580
64.0
186.8
64.0
64.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1. 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 14841. 5 16323 15582.3 2964 14841.5 16323
ROP MWD040 FT/H 0.82 455.84 69.7528 2820 14913.5 16323
GR MWD040 API 20.24 261. 54 71.6194 2822 14841. 5 16252
RPX MWD040 OHMM 2.1 2000 11.119 2820 14852 16261.5
RPS MWD040 OHMM 1. 69 2000 16.1058 2820 14852 16261.5
RPM MWD040 OHMM 1.17 2000 20.4853 2820 14852 16261. 5
RPD MWD040 OHMM 1.64 2000 14.8068 2820 14852 16261.5
FET MWD040 HOUR 0.91 32.71 3.71622 2820 14852 16261. 5
SCANNED OCT 0 9 2004
(
first Reading For Entire File..........14841.5
Last Reading For Entire File...........16323
File Trailer
Service name.............STSLIB.003
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/09/16
Maximum Physical Record..65535
Fi 1 e Type................ LO
Next File Name...........STSLIB.004
Physical EOF
Tape Trailer
Service name.............LISTPE
Oat e. . . . . . . . . . . . . . . . . . . . .04/09/16
Origin...................STS
Tape Name................UNKNOWN
Continuation Number......01
Next Tape Name...........UNKNOWN
Comments. . . . . . . . . . . . .. . . . STS LIS
Writing Library.
Reel Trailer
Service name.............LISTPE
Date.....................04/09/16
Origin...................STS
Reel Name................ UNKNOWN
Continuation Number......01
Next Reel Name...........UNKNOWN
Comments. . . . . . . . . . . . . . . . . STS LIS
Writing Library.
Physical EOF
Physical EOF
End Of LIS File
(
Scientific Technical Services
Scientific Technical Services
SCANNED OCT 0 9 2.Q04
NL BAROID M~4D
LIS 9 TRACK MAGNETIC TAPE
VERIFICATION LISTING
RECORD TYPE i:~~._~ REEL HEADER
RECORD LENGTH = 132
SR. VCNM '~' R.x I"10x [.A REELNAME RC PRETAPNM
RLL-B 8'_-~/0~.~ 24 890 'r_ .
~L~gAK Ol
COMMENTS: P1ND AND MAD DATA. NO DENSITY DATA DUE TO SFD TOOL FAILURE.
RECORD TYPE,~"'32 COM["IENTS
I i~ · I I I~ Im · m · II m · · m I · · mi · · · · m m m
COMPANY NAME
: BP EXPLORATI ON
NELL NAME
FI ELD NAME
:PRUDHOE BAY
COUNT]"
:NORTH SLOPE
STAT E : H LH._ K~
COUNTRY : U. S. A.
RIG :.AUDI ~3
COMPANY REP :MR, LORENZEN
RECORD TYPE 1~0 TAPE HEADER.
~ · I I I t · · I I I I · I · · n · · · I · ·
REL:uRD LENGTH = 1~'.-~
SRVC:NM YR/MO/DA TAPENAME RC PRETAPNM
RLL-B 89/06/24 ~_ 0609-1 01
COMMENTS: MND AND MAD DATA. NO DENSITY DATA DUE TO
SFD TOOL FAILURE.
~ RECDRD LENGTH = 62
F I LNAM, NUM MAX RL
RLL-B tOOl ' 1024
COMMENTS FOR THIS FILE
:MND DATA
PREVFLNAME
RECORD TYPE 64 DATA FORMAT. ¢'oPEF.'_. I F I CAT I ON ..........
RECORD LENGTH =
TYPE SIZE CODE
4 I B
13 I B
14 4 A
15 I B
0 0 B
508 BYTES
DESCR I PT I ON
UP/DOMN FLAG = -i
OUTPUT DEPTH FLAG = 0
UNITS OF DEPTH IN DATA RECORDS =
REP CODE FOR OUTPUT DEPTH = D
TERMINATOR
FT
DATA SPECIFICATION BLOCKS
NAME SRVCNM ORDERNUM UNIT LOGT CRUT CRVC APIM FI LNUM SIZE
DEPT RLL-B 00000000 FT 0 0 0 0 01 04
SGRA RLL-B 00000000
0 0 0 0 01 04
SGRB RLL-B 00000000
0 0 0 0 O1 04
SGRC RLL-B 00000000
0 0 0 0 O1 04
SEWR RLL-B 00000000
0 0 0 0 O1 04
SROP RLL-B 00000000 0 0 0 0 O1 04
CNPS RLL-B 00000000
0 0 0 0 Ol 04
..NFO RLL-B 00000000
0 0 0 0 O1 04
SNFi RLL-B 00000000
0 0 0 0 O1 04
SNNO RLL-B 00000000 0 0 0 0 O1 04
SNN1 RLL-B 00000000 0 0 0 0 O1 04
SFXE RLL-B 00000000
0 0 0 0 Ol 04
SFXN RLL-B 00000000
0 0 0 0 O1 04
DEPT SGRA SGRB SGRC SEMR
CNPS SNFO SNF1 SNNO SNN1
SFXN
14603.00 -999.25 -999,25 -999,25 -999.25
-999,25 -999,25 -999,25 -999.25 -999.25
-999,25
14703.00 69.19 63.05 66.12 12.79
24,24 964,52 970,68 3499.88 3483.67
1.26
14803.00 74.39 71.74 73.06 90.30
8.02 1724.03 1699.85 4670.25 4698.52
1.84
14903.00 32.66 38.87 35.76 16.13
25,19 876,18 848,74 3411,28 3538.11
3.70
15003,00 16,89 17,97 17,43 13.39
27.13 755.50 801.62 3426.20 3398.34
0.52
PLVL
0001
0001
0001
0001
0001
0001
0001
0001
0001
0001
0001
0001
0001
SROP
SFXE
-999.25
-999.25
12.76
1.06
1'2.94
1.48
49.22
3,64
92.12
0.46
11~ ~
15203. CiO 18.36 20.14 19.25 2.23 105.68
.2~. 47 730 . 26 740 . 81 3309.93 3276.99 0 · 20
0.29
15303. O0 21 . 73 17.70 19.72 4.96 49.03
19.81 981 . 97 1026.71 3782.46 3720 · 41 0 · 34
0.42
15403.00 19.93 19,33 19.63 2. O0 60 · 76
-999.25 -999.25 -999.25 -999.25 -999.25 O. 44
-999.25
RECORD TYPE 129 FILE TRAILER ......................
RECORD LENGTH = 62
F I LNAM. NUM MAXRL
RLL-B .001 1024
NEXTFLNAME
RECORD TYPE 128 FILE HEADER .......................
RECORD LENGTH = 62
F I LNAM. NUM MAX R L
RLL-B .002 1024
PREVFLNAME
COMMENTS FOR THIS FILE :MAD DATA
RECORD TYPE 64 DATA FORMAT SPECIFICATION
RECORD LENGTH =
TYPE SIZE CODE
4 I B
13 i B
14 4 A
15 I B
0 0 B
508 BYTES
DESCR I PT I ON
UP/DONN FLAG = -I
OUTPUT DEPTH FLAG = 0
UNITS OF DEPTH IN DATA RECORDS = FT
REP CODE FOR OUTPUT DEPTH = D
TERMINATOR
DATA SPECIFICATION BLOCKS
NAME SRVCNM ORDERNUM UNIT LOGT CRVT CRVC AP IM F ILNUM
DEPT RLL-B 00000000 FT 0 0 0 0 02
SGRA RLL-B 00000000 0 0 0 0 02
SGRB RLL-B 00000000 0 0 0 0 02
SGRC RLL-B 00000000 0 0 0 0 0~
SENR RLL-B 00000000 0 0 0 0 02
SRAT RLL-B 00000000 0 0 0 0 02
CNPS RLL-B 00000000 0 0 0 0 02
SNFO RLL-B 00000000 0 0 0 0 02
SNF1 RLL-B 00000000 0 0 0 0 02
SNNO RLL-B 00000000 0 0 0 0 02:
SNN1 RLL-B 00000000 0 0 0 0 0'".-
SFXE RLL-B 00000000 0 0 0 0 02
SIZE PLVL R
04 0001 D
04 0001 D
04 0001 D
04 0001 D
04 0001 D
04 0001 D
04 0001 D
04 0001 D
04 0001 D
04 0001 D
04 0001 D
04 0001 D
SFXN RLL-B 00000000 0 0 0 0 8,.. n4 0001 D
· , CNPS SNFO SNFi 5NNU ~r,~r,~.L
SFXN
..1 -'~ ~ ~, ~
· ~,. c.o. O0~ -999 .25 -999 .2.~_ -':~96___ ..--"~5 -999 .25
-999.25 -999.25 -999.25 -999.25 -999.25
-999.25
14858.00 65.75 65.42 65.58 7.94
34.55 807.00 759.00 3096.00 3064. O0
20.7G
14958.00 65.92 59.86 62.89 8.12
32.12 815. O0 831 · O0 3208.00 3112.00
14.74
15058.00 25.37 16.39 20.88 7.67
29.58 727.00 743.00 3256.00 3336. O0
13.38
15158.00 77.61 74.52 76.06 4.56
39.86 695.00 743.00 2968.00 2872.00
12.06
15258.00 19.59 18.72 19.15 3.15
24.51 839.00 871 · O0 3592.00 3480.00
9.13
15358.00 15.64 18.59 17.11 2.18
26.52 797.40 777.24 3376.32 3504.32
8.12
RECORD TYPE 129 FILE TRAILER ......................
RECORD
FILNAM.
RLL-B .
RECORD
LENGTH = 62
N UM MAX R L NEXT F LNAM E
002 1024
TYPE 131 TAPE TRAILER ......................
RECORD LENGTH = 132
SRVCNM Y R..."M 0..-" DA TAPENAME RC NXTTAPNM
RLL-B 89/'06/24 8.,,90 GO 9-1 01
COMMENTS: MWD AND MAD DATA. NO DENSITY DATA DUE TO SFD TOOL
-999.25
-999.25
129.59
20.67
130.44
14.73
161.41
13.35
156.59
12.04
129.95
9.10
196.88
8.08
FAILUREI
RECORD TYPE 133 REEL TRAILER ......................
RECORD LENGTH = 132
SRVCNM YR/MO/DA
REELNAME RC NXTRELNM
RLL-B 89/06/24 89060 DAR 01
COMMENTS: MWD AND MAD DATA. NO DENSITY DATA DUE TO SFD TOOL FAILURE.
'" ~,L~,SKiB COMPUTING CENTER
'4,: ....... .SCHLUMBERGER
COMPANY NAME : 8P EXPLORATION
WELL N,~ME : W-09 (41-32-11-t2)
FIELD NAME : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE : AL,~SKfl
~PI NUMBER : 50-029-21947
RSFE~ENCE NO : ?3353
TAPE VER!FICATICN L"STIN~S
~HLUMBERGER ALASKA COMPUTING CENTER
28-JUN-.1989 13:03
PAGE '
*~-'* ~-' RE'EL HE.~DER ~,~
SERVICE N4ME : EDIT
D~TE : 89/05/27
ORIGIN :mLIC
REEL NAME : 73383
CDNTINUATION ~ :
PREVIOUS REEL :
COMMENT : ~P ~DRUDHC~
BAY~ W-O9
(41-~2-! 1-1Z), ~P I
~50-029-21947
~'~"~ -" TAPE HEADER
SERVICE N~ME : EDIT
DATE : 89/05/27
ORIGIN : FLIC
TAPE NAME : 73383
CONTINUATION
PREVIOUS T~PE :
COMMENT : BP ,PRUDH~E
· -~** FILE HEADER
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION :
D~TE : 89/06/27
MAX REC SIZE : 1096
FILE TYPE : LO
LAST FILE :
HAY, W-O9
(41-32-11-12),API
~50-029-Z194T
-'-~ SCHLUMSERGE.R WELL SERVICES =~
COMPANY NAME: ~P EXPLORATION
WELL: W-09 (41-32-11-!2)
FIELD: PRUDHOE ~Y
BOROUGH: NORTH SL~OPE
STAT'E: ALASKA
AP1 NUMBER: 50-029-21947
LOCATION: 14~7" SNL ~ 'llg4' :WEL
SECTION: 21 TOWNSHIP: liN
RANGE:
I2E
rAPE VERIFICATION LISTING
~.HLUMBERGER ALASK,~ COMDUTT_NG CENTER
28-JUN-1989 13:03
PAGE:
PERMANENT D~TUM: MSL ELEVATION: 0.0
LOG MEASURED FROM RKB 90.7 ABOVE PERMANENT D~TUM
ELEVATIONS KB: 90.7
DF:: 90.7 GL: 52.9
D~TE LOGGED: 22-JUN-89
RUN NUMEER: ONE
TD DRILLER: 15430
TD LOGGER: 15439
CASING: 9 5lB" 47 LB @ DRILLER DEPTH DF 14637 AND L3GGER DEPTH OF 14628
BlT SIZE: 8 1/2" @ 15430
TYPE FLUID IN HOLE: LIGNO
DENSITY:
PH: 9.5
VISCOSITY: 36
FLUID LO SS: 5
MUD RESISTIVITY:
FILTRATE RESISTIVITY:
MUD CAKE RESISTIVITY:
2.55 :~ 55
2.49 @ 60
2.59 2 63
TIME CIRCULATION ENDED: 06:30 22-JUN
TIME LOGGER ON BOTTOM: 16:55 22-JUN
MAXIMUM TEMP RECORDED: 205
LOGGING DISTRICT:
LOGGING ENGINEER:
WITNESS:
PRUOHOE BAY
TINKHAM
WHITE/SHAW/WI LLOUGHSY
TOOL NUMBERS: DIS :2140
SLS WA 1639
CNC A 1238
I~M 1347
SLM 1552
DIC 2191
SLC MA 155
SGC JC 2626
NLM 1376
FIELD REMARKS:
TEFLON STANDCFFS USED:' Z - OIL , 5- ~HC , I - GR.
WHEELS AND H~LE FINGER USED ON ~TM. OF OIL SONDE.
TOT6. L L~NGTH OF BTM. RSSEM~,LY IS 64 INCHES.
MAIN PASS LOGGED ~T IOOO'/"HgUR TO REDUCE SONIC CYCL'E SKIPS.
!BEFORE AND AFTER CNL CALIBR,RTION JIG COUNTS ARE LOWER THAN CNL
SHOP JI~ COUNTS DUE TO GR/NUCLE~R KILL CIRCUIT IN SONIC TOOL.
SONIC'i DATA :S SENT UPHOLE DURING "KILLED" INTERVAL. THIS
INTERVAL CAUSES REDUCTION IN GR ~ CNL COUNTS.
DATE ,JOB STARTED: 2T-JUN-89
JOB REFERENCE NO: 73383
LDP/ANA: J. KOHRING
TAPE VERIFIC~TIC-N LISTING
uHLUMSERGER ALASKA COMPUTING CENTER
2~-JUN-1989 13:03
PA'~' E· 3
FILm -
~ ~ :git .001
BP EXPLORATION
PRUDHOE B~Y
W-09 (41-32-11-12)
50-029-21947
MAIN PASS LOG DAT~
D~TA SAMPLED EVERY -.5000 FEET
DATA INCLUDED -
TOOL EXTENSION TOOL
TYPE USED N~ME
DIT-D .DIL DUAL INOUCTION SFL 15428' - 14628'
, BHC .BHC BOREHOLE COMP~ENSATED SONIC 1539T' - 14628'
~ CNT-A/D/H .CNL COMPENS~.TED NEUTRON 153T9" - 14628'
-'- . - 11297'
· ,- CNT-A/O/H CSG CNL/GR IN CASING
TABLE TYPE : CONS
TUNI VALU DEFI
CN BP EXPLORATION
FN PRUDHOE BAY
WN W-09 (41-32-11-12)
APIN 50-029-21947
FL 1~37' SNL & 1194' WEL
SECT 21
TOWN 1 tN
RANG
COUN NORTH SLOPE
ST~T ALASKA
NATI USA
ENGI TINKHAM
WITN WHITE/SHAW/WILLOUGHBY
SON 549128
POAT MSL
EPO FT 0
LMF RKB
A P O F T 9 O . 7
EKB FT 90.7
EOF ' FT 90.7
EGL F'T 52.9
TOD FT 1 5430.
BLI FT 15428.
TLI FT 14628.
TCS 06:30 Z2-JUN
COMPANY NAME
FIELD NAME
WELL N~ME
API SERIAL NUMBER
FIELD LOCATION
SECTION
TOWNSHIP
R~NGE
COUNTY
STATE OR PROVINCE
NATION
~NGINEER'S NAME
WITNESS"S NAME
SERVICE ORDER NUMBER
PERMANENT DATUM
LOG MEASURED FROM
BOTTOM LOG INTERVA:L
TOP LOG INTERVAL
TIME CIRCULATION STOPPED
TAPE VERIFICATION LISTING
~.~LUMBERGER ALASKA COMPUTING CENTER
28-JUN-1989 13:03
TUNI VALU DEFI
PAGE:
TLAB
14:55 22-JUN
TIME LOGGER AT BOTTOM
TABLE TYPE : CURV
DEFI
OEPT
ILD
ILM
SFLU
SP
GR
TENS
DT
TT1
TT2
TT3
TT4
SP
GR
TENS
NPHI
TNPH
TNRA
NPOR
RCNT
RCFT
CNTC
CFTC
TENS
NPHI
TNPH
TNR.A
NDOR
RCNT
RCFT
CNTC
CFTC
GR
TENS
DEPTH CHANNEL NAME
IL-DEEP RESISTIVITY
IL-MEDIUM RESISTIVITY
SFL UN.~V ERAGED
SPONTANEOUS POTENTIAL
GAM~A RAY
TENSION
DELTA-T
TRANSIT TIME 1
TRANSIT TIME 2
TR~N'SIT 'TIME 3
TRANSI'T TIME 4
SPONTANEOUS POTENTIAL
GAMMA RAY
TENSION
NEUTRON POROSITY
THERMAL NEOTRON POROSITY
CALIBRATED THERMAL NEUTRON RATIO
NEUTRON~"ROSI'TY..:: . OUTPUT ~RO~ AN ~P~LICATION PROGRAM.
RAW CO'RRECTE~ NE.&R THERMAL COUNTS
RAW CORR~CTEO ~flR ThERMaL COUN'TS
CORRECTE~ NEAR THER~A,L COUNTS
CORRECTED F~ TH~.M.~,L C~UNTS
TE NS ICN
NEUTRON POROSITY
THERMAL NEUTRON POROSITY
CALIBRATED THERMAL NEUTRON R~TIO
NEUTRON POROSITY OUTPUT FRO~ AN ~PPEICATION 'PROGRAM
RAW CO~RECTED,,~NEAR THERMAL COUNTS
RAW CORRECTED FAR THERMAL GOUNTS
CORRECTED NEAR THERMAL COUNTS
CORRECTED F~ THERMAL COUNTS
GAMM~ ~Y
TENSION
TAPE VERiFICaTION LISTING
c~LUMiBERGER ~LASK~ COMPUTING CENTER
28-JUN-lgB9 13:03
PAGE:
.~ OATA FORMAT SPECIFIC:~TICN RECORD
~' SFT TYPE 64:~ '~'~
TYPE REPR CODE VALUE
I 66 0
2 66
3 73 140
5 66
6 73
? 65
8 68 0.5
9 65 FT
11 66 7
12 68
13 66 0
14 65 mT
15 66 68
16 66
0 66
*'~.,- SET TYPE - CHAN ~'*~,--
NAME SERV UNIT SERVICE AP1 API ~I ,~PI FILE NUMB NUMB SIZE REPR
ID ORDER ~ LOG TYPE CLASS MOD NUMB SAMP ELaM CODE
PROCESS
:( H 'E X )
DEPT FT 549128 O0
ILO OIL OHMM 5~9128 '07
ILM DIL ~HMM 549128 07
SFLU OIL OHMM 549128 07
SP OIL MV 549128 07
GR DIL G~PI 54'9128 07
TENS OIL LB 549128 07
DY BHC US/F 549128 O?
TT1 BHC US 549128 07
TT2 ~HC US 5491,Z8 07
TT3 BHC US 549128 07
TT4 BHC US 549128 07
SP ~HC NV 549128 07
GR BHC GAPI 549128 0'7
T,ENS BHC LB .54912B 07
NPHI CNL PU 549128 07
TNPH CNL PU 5~9128 07
TNRA CNL ,549128: 07
NPOR CNL' PU 549128 07
RCNT CNL CPS 549125' 07
RCFT CNL CPS 549128 07
CNTC CNL C~S 549128 07
CFTC CNL CPS 549128 07
GR CNL C~API 549128 07
TENS CNL L~ 549128 07
NPHI CSG PU 549128 07
000 O0 0 1 1 1
120 4.6 0 1 1 1
120 44 0 1 1 1
220 O1 0 1 I I 4
010 O1 O 1 t 1
310 OI 0 1 1 1
635 21 0 1 1 1
520 80 0 1 I 1
522 83 0 1 1 1 4
522 83 0 1 1 1 4
522 83 0 I 1
52Z 83 0 I I 1 4
010 O1 0 I 1 1 4
310 01' 0 1 1 1
635 21 0 1 1 1
890 0 0 0 1 1 1
890 O0 0 1 1 1
420 01 0 1 1 1
890 O0 0 1 1 1
420 O1 0 1 1 1
-420 O1 0 1 I I 4
¢ 20 0 1 0 1 1 1 4
420 O1 0 1 1 1 4
310 O1 0 1 1 I
635 Z 1 0 1 I 1 4
890 00 0 1 1 I 4
68 0000000000
68 0000000000
68 0000000000
68 OOOO000000
68 0000000000
68 0000000000
68 O0000ODO00
68 0000000000
68 0000000000
68 O000OO0000
68 0000000000
68 0000000000
68 0000000000
6B 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
TAPE VERIFICATION LISTING
C~LUMBERGER ~LASK& COMPUTING
·
CENT ~ R
NAME SERV UNIT SERVICE API
ID ORDER ~ LOG
----
~PI
TYPE
28-JUN-1989 13:03
Ami ~PI FILE NUMB NUMB SIZE REPR
CLASS "COD NUMB SaMP ELEM CDDE
PRDCESS
(HEX)
PAGE:
TNPH CSG PU 549128
TNRA CSg 549128
NPOR CSG PU 5491 28
RCNT CSG CPS 549128
RCFT CSG CPS 549128
CNTC CSG CPS 549128
CFTC CSG CPS 549128
GR CSG GAPI 549128
TENS CSG LB 549128
07 990
07 42O
07 890
07 420
07 42O
07 420
07 420
07 310
O7 635
O0 0 I I I 4 68
01 0 1 1 1 4
O0 0 I 1 I 4 68
O1 0 1 1 1 4
01 0 I 1 I 4 68
01 0 I I I 4 68
O1 0 1 1 I 4 68
O1 0 1 1 1 4 68
21 0 1 1 1 4 68
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
DATA
DEPT.
SP.DIL
TT1.BHC
SP.BHC
TNPH.CNL
RCFT.CNL
TENS.CNL
NPOR.CSG
CFTC.CSG
DEPT.
SP.DIL
TT1.BHC
SP.BHC
TNPH.CNL
RCFT.CNL
TENS.CNL
NPORoCSG
CFTC.CSG
DEPT.
SP.DIL
TT1.BHC
SP.BHC
TNPH.CNL
RCFT.CNL
TENS.CNL
NPOR.CSG
CFTC.CSG
DEPT.
SP.DIL
TT1.BHC
SP.BHC
TNPH.CNL
RCFT.CNL
TENS.CNL
15459..000
-77.000
565.500
-'T7.0 O0
22.220
1225.867
3080.000
-999.250
-999. 250
15400.000
-60.313
555.000
-50.313
21. 593
1250.001
6108.000
-999.2 50
-999-250
15300.000
-65.313
474.250
-6E.313
17.707
1673.714
6024.000
-999'250
-999,250
15290.000
-44.344
476.750
-44.344
19.328
14~3.487
5920.000
ILD.DIL
GR.DIL
TT2.BHC
GR.BHC
TNRA.CNL
CNTC.CNL
NPHI.CSG
RCNT.CSG
GR.CSG
ILD.DIL
GR.gIL
TT2.BHC
GR.BHC
TNRA.CNL
CNTC.CNL
NPHI.CSG
RCNT.CSG
GR.CSG
ILD.DIL
GR.OIL
TT2.BHC
GR.BHC
TNRA.CNL
CNTC.CNL
NPHI.CSG
RCNT.CSG
GR.CSG
ILD.DIL
GR.DIL
TT2.BHC
GR.BH~C
TNRA.CNL
CNTC.CNL
NPHI.CSG
2.163 ILM.DIL 2.169
29.625 TENS.DIL 3080.000
390.750 TT3.BHC 537.500
29.625 TENS.EHC 3080.000
2.209 NPOR.CNL 22.220
3025.831 CFTC.CNL 1.390.315
-999.250 TNPH.CSG -999.250
-99'9.250 RCFT.CSG -999.250
-999.250 TENS.CSG -999.250
2.436 ILM.DIL 2.801
29.625 TENS.DIL 6108.000
390.750 TT3.BHC 534.000
29.625 TENS.BHC 6108.000
2.124 NPOR.CNL 21.400
3010.337 ~CFTC. CNL 1410.418
-999.250 TNPH.CSG -999.250
-99'9.250 RCFT.CSG -999.250
-999.250 TENSoCSG -999.2.50
5.095 ILM.DIL 5.741
28.078 TENS.OIL 6024.000
332.750 T'T3.BHC 476.000
28.078 TEN:$.BHC 6024.000
1.~65 NPOR.CNL 17.,493
3471.866 CFTC.CNL 1854.96:2
-999.250 TNPH.CSG -999.250
-999.250 RCFT.CSG -999.250
-9'99.250 ~TENS.CSG -999.250
5.021 ILM.DIL 5.612
36.031 TENS.DIL 59,20'000
1328.000 TT3.BHC 479.000
36.031 TENS.BHC 5920.000
2.041 NPOR.CNL 19.890
332~..794 CFTC.CNL 1679.702
-999.250 TNPH.CSG -999.250
SFLU.OIL
DT.BHC
TT4.BHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.OIL
DT.SHC
TT4.SHC
NPHI.,CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
'TT4.SHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT.SHC
TT4.SHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
7.474
85.688
369.500
22.048
2961.160
29.625
-999.250
-999.250
6.151
35.313
374.750
20.775
29,64.503
29.625
-999.250
-999.250
12.431
73.688
332.000
16.896
3424.086
Z8.078
-999.250
-999.250
12.200
71.563
328.750
19.531
3195.66.5
36.031
-999. Z 50
TAPE VERIFICATZDN LISTING
C~LUMBERGER AL~SK~ COMPUTING CENTER
NPOR.CSG -$99.250 RCNT.CSG
CFTC.CSG -999.250 GR.CSG
DEPT. 151 DO. 000 ILO.OIL
SP.DIL -76.375 GR .OIL
TT1.BHC 555.500 TT2.BHC
SP.BHC -76.375 GR.BHC
TNPH.CNL 25.716 TNRA.CNL
RCFT. CNL 1015.982 CNTC.CNL
TENS.CNL 5780.000 NPHI.CSG
NPDR.CSG -999.250 RCNT.CSG
CFTC. CSG -999.2 50 ~R. C SG
DEPT. 15000. 000 ILO.OIL
SP.DIL -¢9.063 GR.DIL
TT1. BHC 514. 500 T'T2. BHC
SP.BHC -49.063 GR.BHC
TNPH.CNL 23.259 TNRA.CNL
RCFT.CNL 1091.168 CNTC.CNL
TENS.CNL 5708.000 NPHI.CSG
NPOR.CSG -999.250 RCNT.CSG
CFTC.CSG -999. 250 GR.CSG
DEPT. 14900. 000 ILO.OiL
SP.DIL -41.313 GR.CIL
TI1. BHC 448. OOO TT2. BHC
SP. BHC -4t. 313 GR. BHC
TNPH.CNL 19.320 TNR~-CNL
RCFT.CNL 1359.033 CNTC.CNL
TENS.CNL 5760.000 NPHI.CSG
NPORoCSG -999.250 RCNT.CSG
CFTC. CSG -9 99.2.50 GR.CSG
DEPT. 14800. 000 ILO-OIL
SP. OIL 9.2 34 GR.OIL
TTI.BHC 396.250 TI2. BHC
SP.BHC 9. 234 GR. B MC
TNPH.CNL 10.413 TNRA.CNL
RCFT.CNL 3020.812 CNTC.CNL
TENS.CNL 5712.000 NPHI.CSG
NPOR.CSG -99~9. 250 RCNT.CSG
CFTC. CSG -999.250 GR' CSG
DEPT. 14700. 000 ILO.OIL
SP.DIL 16.484 GR.DIL
TTI.:BHC 4.16. 250 TT2. BHC
SP.BHC 16.484 GR.BHC
TNPH.CNL 13.084 TNRA.CNL
RCFT.CNL 2348.3.~1 CNTC.CNL
TENS.CNL 5664.090 NPHI.CSG
NPOR.CSG 12.751 RCNT.CSG
CFTC.CSG 2610. 464 GR. C SG
29-JUN-1989 13:03
-999.250 RCFT.CSG
-999.250 TENS.CSG
8.947 ILM.CIL
26.875 TENS.OIL
378.750 TT3.BHC
26.875 TENS.BHC
2.443 NPOR.CNL
2773.962 CFTC.CNL
-999.250 TNPH.CSG
-999.250 RCFT.CSG
-999.250 TENS.CSG
11.343 ILM.DIL
59.688 TENS.OIL
349.000 TT3.BHC
59.688 TENS.BHC
2.290 NPOR.CNL
2841.724 CFTC.CNL
- 99'9. 250 TNPH.CSG
-999.250 RCFT.CSG
-999.250 TENS.CSG
4.281 ILM.DIL
80.500 TENS.OIL
322.750 TT3.BHC
80.500 TENS.~HC
1.971 NPOR.CNL
3102.962 CFTC.CNL
-~99.250 TNPH.CSG
-999.250 RCFT.CSG
-999.250 TENS.CSG
77.135 ILM.DIL
112.438 TENS-D[L
274.250 TT3.BHC
112.438 'TENS.SHC
1.388 NPOR.CNL
4515.401 CFTC.CNL
-999.250 TNPH.CSG
-999.250 RC~T.CSG
-999.250 TENS.CSG
39.034 ILM.DIL
65.56'3 TENS.DIL
292.250 TT3.BHC
65.563 TENS.BHC
1.571 N~OR.CNL
4174.510 CFTC.CNL
13..356 TNPH.CSG
41314.514 RCFT.:CSG
107.375 TENS.CSG
-999.250
-999.250
7.359
5780.000
554.000
5780.000
26.033
1151.622
-999.250
--999.250
-999.250
11.036
5708.000
514.000
5708.000
25.136
1265.387
-999.250
-999.250
-999.250
5.093
5760.000
452.000
5760.000
18.726
1566.212
-999.250
-999.250
-999.250
67.962
5712.000
396.250
5712.000
9.564
3302.091
-999.250
-999.250
'-999.250
33.420
5664.000
416.000
5664.000
12.044
26 B 6.5:56
13.503
231 4. 342
5892.000
CNTC.CSG
SFLU.DIL
DT.SHC
TT~.8HC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
S~LU,OIL
OT.BHC
TT4.BHC
NPHI,CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC,CSG
SFLU.DIL
DT.BHC
TT4. BHC
NPHI.CNL
RCNT .CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU',DIL
DT,BHC
TT4,BHC
NPHI ,CNL
RCNT,CNL
GR,CNL
TNR.~,CSG
CNTC,CSG
S~LU',DIL
DT.SHC
TT4. BHC
NPHI,CNL
RCNT ,CNL
GR,CNL
TNRA.CSG
CNTC,CSG
PAGE:
-999.250
13.390
87.500
377.500
25.553
2689.783
26.875
-999.250
-999.250
10.451
79.188
3~8.000
23.258
2627.203
59.688
-999.250
-999.250
7.863
66.688
322.000
18.472
3099.985
BO.500
-999. 250
-999.250
168.891
53.625
277.000
9.740
4598.258
112.438
-999.250
-999. 2150
53.212
61.500
291.000
12. 479
42'70. 629
55.563
1.630
4132.058
TAPE YERIFICATION LISTING
,CHLUMSERGER ,aLASK.& COMPUTING
CENT=R
DEPT. 14600.0 O0 ILD. DIL -99
SP. DIL -999 . 250 GR . O IL - 99
TT1.8HC -9 99. 250 TT2. ~HC -99
SP. ~BHC -999.250 GR. BHC -99
TNPH.CNL -999. 250 TNRA.CNL -99
RCFT.CNL -999.250 CNTC.CNL -99
TENS.CNL -999.250 NPHI .CSG 5
NPOR.CSG -999.250 RCNT.CSG 150
CFTC. CSG 3 65. 541 GR. CSG
DEPT. 14500.000
SP.DIL -999.250
TT1.BHC -999.250
SP.BHC -999.250
TNPH.CNL -999.250
RCFT.CNL -999.250
TENS.CNL -999.250
NPOR.CSG -999.250
CFTC.CSG 359.2~5
DEPT. 14400.000
SP.DIL -999.250
TT1.BHC -999.250
SP.BHC -999.250
TNPH.CNL -999. 250
RCFT.CNL -999.250
TENS.CNL -999.250
NPOR.CSG -999.2,50
CFTC.CSG 404.626
DEP'T. 14300.000
SP.DIL -999.250
TTi. SHC -999. Z50
SP.BHC -999.250
TNPH. CNL -999' 250
RCFT.CNL -999.250
TENS. CNL -999.2 50
NP1DR.:CSG -999.250
CFTC.CSG 344. 952
DEPT. 14200.000
SP.DIL '-999.250
TT1.BHC -999.250
SP.BHC -999.250
TNPH.CNL -999. 250
RCFT. CNL -999. Z 50
T ENS.CNL -999. 250
NPOR. CSG -999.250
CFTC. CSG 370. 261
Itg. DIt
GR .OIL
TTZ.BHC
r~R .BHC
TNRA .CNL
CNTC .CNL
NPHI.CSG
RCNT.CSG
GR.CSG
DEPT. 14100.000
SP.DIL -999.250
TTI.BHC -999.250
SP.BHC -999.250
TNPH.CNL -999.250
ILO.OIL
GR.DIL
TTZ.BHC
GR.BHC
TNRA.CNL
CNTC.CNL
NPH!.CSG
RCNT.CSG
GR.CSG
ILO.OIL
GR .OIL
TT2. BHC
GR. B HC
TNRA .CNL
CNTC,CNL
NPHI. C SG
RCNT.CSG
GR.CSG
ILO.OIL
GR.DIL
TTZ.BHC
GR.BHC
TNR~-CNL
CNTC.CNL
NPHI.CSG
RCNT.CSG
GR.CSG
ILD.DIL
GR.DIL
TTZ.BHC
GR.BHC
TNRA.CNL
28-JUN-1989 13:03
-99
-99
-99
-99
-99
-99
4
145
8
-99
-99
-99
-99
.-99
-99
4
l&2
4
-99
- 99
-99
-99
-99
-99
5
137
8
-99
-99
-99
- 99
-99
· -99
5
t57
6
-99
-99
- 9'9
-99
-99
9.250 ILM.DIL -999.250
9.250 TENS.OIL -999.250
9.250 TT3.BHC -999.250
9.250 TENS.BHC -999.250
9.250 NPOR.CNL -999.250
9.250 CFTC.CNL -999.250
0.~50 TNPH.CSG -999.250
5.680 RCFT.CSG 363.332
5.6~ TENS.CSG 5640.000
9.250 ILM. DIL
9.250 TENS.OIL
9.250 TT3.BHC
9.250 TENS.BHC
9.250 NPOR.CNL
9. Z5O CFTC.CNL
8.862 TNPH.CSG
0.348 RCFT.CSG
1.063 TENS.CSG
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
306.440
5548.000
9.250 ILM.DIL -999.Z50
9.250 TENS.OIL -999.250
9.250 TT3.BHC -999.250
9.25D TENS.BHC -999.250
9.250 NPDR.CNL -999.250
9..250 CFTC.CNL -999.250
1.416 TNPH.CSG -999.250
0.910 RCFT.CSG 336.481
5.438 TENS.CSG 5648.000
<9.250 ILM.DIL -999.250
9.250 TENS.OIL -999.250
9.250 TT3.BHC -999o250
'9.Z50 TENS.BHC -999.250
9.250 NPOR.CNL -999.250
9.250 CFTC.CNL .-999.250
0.445 'TNPH.CSG -999.250
4.535 RCFT.CSG 302.199
9.250 TENS.CSG 5592.000
9.250 ILM.DIL
9.250 TENS.OIL
9.250 T'T3.BHC
9.250 TENS.BHC
9.250 NPOR.CNL
9.250 CFTC.CNL
3.038 TNPH.CSG
2.1599 RCFT.CSG
8.125 TENS.CSG
--999.250
-99'9.250
--9'99.250
-999.250
-999.250
-999.250
-999.250
372.228
5552.000
9.250 ILM.DIL -999.250
9.250 TENS.OIL -999.250
9.250 TT3.BHC -999.250
9.250 TENS.BHC -999.250
9.250 NPOR.CNL -999.250
SFLU.DIL
DT.BHC
TT4.BHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNR~.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT4.BHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNR~.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT4.BHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CN~C:.CSG
SFLU.DIL
DT. BHC
TT4.SHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
S=LU.DIL
DIT.~HC
TT4.BHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.OIL
DT.BHC
TT4.BHC
NPHI.CNL
RCNT.CNL
PAGE:
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
4.192
1501.430
-999. 250
-999.250
-999.250
-999.250
-999. 250
-999.250
4.083
1452.292
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
3.674
1469.677
-999.250
-999.250
-999.250
-999. ,250
-999.250
-999.250
4.I?0
1410. 100
--999.250
-999.250
-999.250
-999.250
-999.250
-999.250
4'312
1478.571
--999.250
-999. 250
-999.250
-999.250
-999.250
TAPE VERIFICATION LISTING
CHLUMBERGER ALASK,~ COMPUTING
·
CENTSR
RCFT.CNL -999.250
TENS.CNL -999.250
NPgR.CSG -999.250
CFTC.CSG 332.80?
DEPT. 14000.000
SP.DiL -999.250
TTI.BHC -999.250
SP.BHC -999.250
TNPH.CNL -999.250
RCFT.CNL -9~9.250
TENS.CNL -999.250
NPOR.CSG -999.250
CFTC.CSt 496.255
CNTC.CNL
NPHI.CSG
RCNT.CSG
GR.CSG
28-JUN-1989 13:03
DEPT. 13900.000
SP.DIL -999.250
TT1.SHC -999.250
SP.BHC -999.250
TNPH.CNL -999.250
RCFT.CNL -999.250
TENS.CNL -999.250
NPOR.CS,~ -999.250
CFTC.CSG '357.876
DEPT. 13800.000
SP.DIL -9'99.250
TT1.BHC -999.250
SP.BHC -999.250
TNPH. CNL -999.2'50
RCFT.CNL -999.250
TENS.CNL -999.250
NPOR.CSG -999.250
CFTC.CSG 3,~7. 330
DEPT. 13?00. 000
SP. DIL -999.25.0
TTI.BHC -999.250
SP.SHC -999.250
TNPH. CNL -999.250
RCFT. CNL --999. 250
TENS.CNL -999.250
NPOR.CSG -999. 250
CFTC.CSG ' 326.375
-999.250 CFTC.CNL
47.999 TNPH.CSG
1497.191 RCFT.CSG
63.531 TENS.CSG
-999.
-999.
330.
5424.
250
250
035
000
ILO.OIL -999.250 ILM.DIL -999.250
GP.DIL -999.250 TENS.OIL -999.250
TTZ.BHC -999.250 T'T3. BHC -999.250
GR.BHC -999.250 TENS.BHC -999.250
TNRA.CNL -999.250 NP~R.CNL -999.250
CNTC.CNL -999.250 CFTC.CNL -999.250
NPHI.CSG 38.123 TNPH.CSG -999.250
RCNT.CSG 1570.37,5 RCFT.CSG 439.260
GR.CSG 51.031 TENS.CSG 5388.000
ILD.DIL -999.250 ILM.DIL -999.250
GR.O!L -999.250 TENS.OIL -~99.250
TT2.BHC -999.250 TT3.BHC -999.250
GR.P_HC -999.250 TENS.BHC -999.250
TNR~.CNL -999.250 NPOR.CNL -999.250
CNTC.CNL -999.250 CFTC.CNL -999.25'0
NPHI.CSG 46.542 TNPH.CSG -999.250
RCNT.CSG 1~67o 850 RC~T.£SG ,7-:95.283
GR.CSG 60.'750 TENS.CSG
ILD.OIL -999.250 ILM.DIL -999.250
GR.DIL -999.250 TENS.OIL -999.250
TT2.BHC -99'9.250 TT3.BHC -999.250
GR.BHC -999.250 TENS.BHC -999.250
TNRA.CNL -99'9. 250 NPOR.CNL -999.250
CN'TC.CNL -999.250 CFTC.CNL -999.Z50
NPHI.CSG 52.91!5 TNPH. CSG -999.250
RCNToCSG 1395.550 RCFT.CSG 291.318
GR.CSG 55.188 TENS.CSG 5292.000
-999.250 ILM.DIL
-999.250 TENS.OIL
-999.250 TT3'BHC
-999.250 TENS.BHC
-999. 250 NPOR.CNL
-999.250 CFTC.CNL
52.674 'TNPH.CSG
1268.482 RCFT.CSG
66.,%~B TENS.CSG
-999. 250 ILM.DIL
-999.250 TENS.OIL
-999.250 TT3.BHC
-999.250 TENS.BHC
-999.2.50 NPOR.CNL
-999.2~0 CFTC.CNL
50.620 TNPH.CSG
1472.I79 RCFT.CSG
67. 875 TENS.CSG
ILD.DIL
GR.DIL
TTZ.BHC
GR.BHC
TNRA.CNL
CNTC .CNL
NPHI.CSG
RCNT .C SG
GR.CSG
-999.250
-999.250
-99'9.250
-999.250
-999.250
--999.250
-999.250
290.760
5272.000
-999.250
-999.250
-999.250
-999.250
-99 9. 250
-999.250
-999.250
275.938
5252.000
DEPT. 13600-000 ILO.OIL
:SP.DIL -999.250 GR.~IL
TT1.BHC -999.250 T'TZ.BHC
SP.~HC -999.250 ~R.BHC
TNPH.CNL -999.250 'TNR~.CNL
RCFT.:CNL -999.250 CNTCoCNL
TENS.CNL -999.250 NPHI.CSG
NPOR.CSG -999.250 RCNT.CSG
CFTC.CSG 350.001 GR.CSG
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT4.BHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT4.BHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNR~.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT4.SHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNR~.CSG
CNTC.CSG
SFL[J.DIL
DT.BHC
TT~.BH£
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT~.BHC
NPHI.CNL
RCNT.~CNL
GR.CNL
TNR~.CSG
CNTC'CSG
PA~E:
-999.250
4.036
1512.591
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
3.494
16~5.820
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
3.956
1459.736
-999.250
-999.250
-999.250
-999.250
-999.250
-999.2S0
4.305
1457.520
-999.250
-999.250
.-999.250
-999.250
-999.250
-999.250
4.292
1328.6~7
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
4.179
1386.773
TAPE VERIFICATION LISTING
,CHLUMSERGER ALASKA CO~PUTING CENTER
ZS-JUN-19B9 13:03
PAGE:
lO
DEPT. 13500.000 ILO.OIL
SP.DIL -999.250 GR.DIL
TT1.BHC -999.250 TT2.BHC
SP.BHC -999.250 SR.BHC
TNPH.CNL -999.250 TNRA.CNL
RCFT.CNL -999.250 CNTC.CNL
TENS.CNL -999.250 NPHI.CSG
NPOR.CSG -999.250 RCNT.CSG
CFTC.CSG 340.765 GR.CSG
DEPT. 13400.000 ILO.OIL
SP.OIL -999.250 GR.gIL
TTI.BHC -999.250 TT2.BHC
SP.~HC -999.250 GR.EHC
TNPH.CNL -999.250 TNRA.CNL
RCFT.CNL -999.250 CNTC.CNL
TENS.CNL -999.250 NPHIoCSG
NPOR.CSG -999.250 RCNT.CSG
CFTC.CSG 349.658 GR.CSG
-999.250 ILM.DIL
-999.~50 TENS.OIL
-999.250 TT3.BHC
-999.250 TENS.BHC
-999.250 NPOR.CNL
-999.250 CFTC.CNL
53.637 TNPH.CSG
1313.520 RC=T.CSG
69.625 TENS.CSG
-999.250 ILM.DIL
-999.250 TENS.OIL
-999.250 TT3.BHC
-999.250 TENS.BHC
-999.250 NPOR.CNL
-999.250 CFTC.CNL
51.~48 TNPH.CSG
1364.067 RCFT.CSG
68.250 TENS.CSG
DEPT. 1.3300.000 ILO.OIL -999.250 ILM.DIL
SP.DIL -999.250 OR.OIL -999.250 TENS.OIL
TTI.~HC -999.250 TTZ.BHC -999.250 T'T3.BHC
SP.BHC -999.250 GR.BHC -999.250 TENS.BHC
TNPH.CNL -999.250 TNRA.CNL -999.250 NPORoCNL
RCFT.CNL -999.250 CNTC.CNL -999.250 CFTC.CNL
TENS.CNL -999.250 NPHI.CSG 46.798 TNPH.CSG
NPOR.CSG -999.250 RCNT.CSG 1366.812 RCFT.CSG
CFTC.CSG 360.302 GR.CSG 62.094 TENS.CSG
DEPT. 13200.000 ' ILO.OIL
SP.DIL -999.250 SR.OIL
TTi. SHC -999.250 T'T2.~HC
SP.BHC -999.250 GR.BHC
TNPH.CNL -999.250 TNRA.CNL
RCFT.CNL -999.250 CNTC.CNL
TENS.CNL -999.250 NPHI.CSG
NPOR.CSG -999.250 RCNT.CSG
CFTC.CSG 411.~61 GR.CSG
DEPT. 13100.000 ILO.OIL
SP.DIL -999.250 GR.DIL
TTI.~HC -999.250 TT2.BHC
SP.BHC -999.250 GR.BHC
TNPH.CNL -999.250 TNRA-CNL
RCFT.CNL -999.250 CNTC.CNL
~ENS.CNL -999.2~0 NPHI.CSG
NPOR.CSG -999.250 RCNT.CSG
CFTC.CSG 462. 558 GR.CSG
BEPT. 13000.000 ILO.OIL
SP. OIL -999. 250 OR.OIL
TT1.5HC -999.2 50 TT2.BHC
SP.BHC -999.250 GR.BHC
-999.. 250 ILM.DIL
-999. 250 TENS. OIL
-999.250 TT3.BHC
-999.250 TENS.BHC
-999.250 NPOR.CNL
-999. 250 CFTC. CNL
~3. 370 TNPH.CSG
1460.1.61 RCFT.CSG
5,4.438 TENSoCSG
-999.250 ILM.DIL
-999.250 TENS.OIL
-999.250 T'T3oBHC
-999.250 TENS.BHC
-99'9.250 NPOR.CNL
-99'9.250 CFTC.CNL
36.123 TNPH.C:SG
1410.78B RCFT.CSG
40.594 TENS.CSG
-999.250 ILM.DIL
-999.250 TENS.OIL
-999.250 TT3'BHC
-999.250 TENS'BHC
-999.250
-999.25D
-999.250
-999.250
-999.250
-999.250
-999.250
323.959
5240.000
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
33~.640
5188.000
-999.250
-999.250
-999.250
-999. 250
-999.250
'-999.250
-999.250
338.325
5144.000
-999.250
-999. 250
-999.250
· - 99 9. 250
-999..250
-999.250
-999.250
355.935
5120.000
--999.250
-999.250
-999.250
-999.250
-999.250
--999. 250
'-999.250
420. 105
5084. 000
-999.250
-999.250
-999.25'0
- 999.250
SFLU.DIL
gT.BHC
TT4.BHC
NPHI.CNL
RCNT.CNL
GR .CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT4.SHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT4.BHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT4.BHC
NPHI.CNL
RCNT.'CNL
GR .CNL
TNRA.CSG
CNTC.CS~
SFLU.DIL
DT.BHC
TT4.~HC
NPHI.CNL
RCN'T.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT4.SHC
NPHI.CNL
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
4.345
1402.077
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
4.247
1397.627
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
3.970
1435.715
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
3.7821
1491.946
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
3.384
1543.773
-9'99.250
-999.250
-999.250
-999.250
TAPE VERIFICATION LISTING
CHLUMBERGER AL,&SK4 COMPUTING CENTER
TNPH.CNL -999.250 TNRA.CNL
RCFT.CNL -999.250 CNTC.CNL
TENS. CNL -999.250 NPHI. C SG
NPDR.CSG -999.250 RCNT.CSG
CFTC.CSG 415.645 GR.CSG
2 8-JUN-1989 13:03
-999.250 NPGR.CNL
-999.250 CFTC.CNL
35.612 TNPH.CSG
1380.341 RCFT.CSG
5! .000 TENS.CSG
-999.250
-999.250
-999.250
366.249
5080.000
DEPT. 12900.000 ILD.DIL -999.250 ILM. DIL -999.250
SP.DIL -999.250 GR.DIL -999.250 TENS.OIL -999.250
TT1.3HC -999.250 TT2.BHC -999.250 TT3.BHC -999.250
SP.BHC -999.250 GR.BHC -999.250 TENS.BHC -999.250
TNPH.CNL -999.250 TNRA.CNL -999.250 NPOR.CNL -999.250
RCFT.CNL -999.250 CNTC.CNL -999.250 CFTC.CNL -999.250
TENS.CNL -999.250 NPHI.CSG 53.108 TNPH.CSG -999.250
NPOR.CSG -999.250 RCNT.CSG 1230.172 RCFT.CSG 270.955
CFTC.CSG 304.066 GR.CSG 55.250 TENS.CSG 5060.000
DEPT. 12800.000 ILO.OIL -999.250 ILM.DIL -999.250
SP.DIL -999.250 GR.DIL -999.250 TENS.DIE -999.250
TTI.~HC -999.250 TTZ.~HC -999.250 TT3.BHC -999.250
SP.!SHC -999.250 GP,,. BHC -999.25.0 TENS.BHC -999.250
TNPH.CNL -999.250 TNRA.CNL -999.250 NPOR.CNL -999.250
RCFT.CNL -999.250 CNTC.CNL -999.250 CFTC.CNL -999.25.0
TENS.CNL -999.250 NPHI.CSG 52.223 TNPH.CSG -999.250
NPOR.CSG -999.250 RCNT.CSG 1347.799 RCFT.CSG 289.253
CFTC.CSG 315.990 GR.CSG 63.781 TENS.CSG 5012.000
-999.250 ILM.DIL
-999.250 TENS.OIL
-999.25'0 TT3.BHC
-999.250 TENS.BHC
-999.250 NPOR.CNL
-999.250 CFTC.CNL
55.440 TNPH.CSG
1 230. 172 RCFT.CSG
58.313 TENS.CSG
DEPT. 12700.000 ILD.DIL
SP.DIL -999.250 GR.DIL
TT 1. BHC -999'2 50 TT2. BHC
SP.BHC -999.250 GR.BHC
TNPH.CNL -999.250 TNRA.CNL
RCFT.CNL -999.2.50 CNTC'CNL
TENS.CNL -999.250 NPHI.CSG
NPOR.CSG -999.250 RCNT.CSG
CFTC.CSG 305. 460 GR.CSG
-999.250
-999.250
-999. ,250
-999.250
-999.,250
-999.250
-- 99 9..250
304.154
4992.000
DEPT. 12600.000 ILO.DIE -999.250 ILM.DIL -999.250
SP.DIL -999.250 GR.~IL -999.250 TENS.OIL -999.250
TT1.BHC -999.250 TT2.BHC -999.250 TT3.BHC -999.250
SP.BHC -999.250 GR.~HC -999.250 TENS.BHC -999.250
TNPH.CNL -999.250 TNRA..CNL -999.250 NPOR.CNL -999.250
RCFT.CNL -999.250 CNTC.CNL -999'250 CFTC.CNL -999.250
TENS.CNL -999.250 NPHI-CSG 54.777 TNPH.CSG -999.250
NPOR.CSG -999.250 RCNT.CSG 1325.317 RCFT.CSG 312.929
CFTC.CSG 316.3118 G~.CSG 61.625 TENS.CSG 4972.000
DEPT. 12500- 000 ILO. OIL
SP.OIL -ggg. 250 GR.OIL
TT1. BHC -999.2.50 TT2. BHC
SP. BHC -999,250 GR. 8HC
TNPH.CNL -999.250 TNRA.CNL
RCFT.CNL -999.250 CNTC.CNL
TENS.CNL -999.250 NPHI.CSG
NPOR.CSG -999.250 RCNT.CSG
CFTC.CSG 297. 750 GR.CSG
-999.250 ILM.DIL -999.250
-999o250 TENS.OIL -999.250
-999.250 ~TT3.BHC -999.250
-999.250 TENS.~HC -999.250
-999.250 NPOR.CNL -999.250
-999.~50 CFTC.CNL -999.250
513.933 TNPH.CSG -99'9.250
1347.69~B RCFT.CSG 278.I6,6
58.625 TENS.CSG 4972.000
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT4.BHC
NPHI.CNL
qCNT.CNL
GR.CNL
TNR~.CSG
CN?C.CSG
SFLU.DIL
DT.SHC
TT4.BHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.OIL
DT.BHC
TT4. BHC
NPHI. CNL
RCNT.CNL
GR .CNL
TNRA.CSG
CNTC. CSG
SFLU.OIL
O T. :~S H C
TT4.BHC
NPHI.CNL
RCNT .CNL
GR .CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT. BHC
TT4.5HC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
PAGE: 1t
-999.250
-999.250
3.356
1401.135
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
4.316
1337.022
-999.2 50
-999.250
-999.250
-999.250
-999.250
-999.250
4.267
1328.398
-999.250
-999.250
-9'99.250
-999.250
-999.250
-999.250
4.499
1329.100
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
4.407
1386.064
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
4.361
1313.395
TAPE VERIFIC~TION LISTING
,CHLUM~ERgER ALASKA CCMPUTING
DEPT. 12400.000
SP.DIL -999.250
TT1.BHC -999.250
SP.BHC -999.250
TNPH.CNL -999.250
RCFT.CNL -999.250
TENS.CNL -999.250
NPDR.CS'~ -999.250
CFTC.CSG 321.750
DEPT. 12300.000
SP.DIL -999.250
TT1.BHC -999.250
SP.BHC -999.250
TNPH.CNL -999.250
RCFT.CNL -999.250
TENS.CNL -999.250
NPOR.CSG -999.250
CFTC.CSG 322.819
DEPT. 12200.000
SP.DIL -999.250
TTI.~)HC -999.250
SP.BHC -999.250
TNPH.CNL -9 99.
RCFT.CNL -999.250
TENS.CNL -999.250
NPOR.CSG -999.250
CFTC.CSG 338.598
DEPT. 12100.000
SP.DIL -999.250
TT1.BHC -999.250
SP.BHC -999.250
TNPHoCNL -999.250
RCFT. CNL -999.2 50
TENS.CNL -999.250
NPOR.CSG -999.250
CFTC.CSG 304.242
DEPT. 12000.000
SP.OIL -999.250
TT1.BHC -999.250
SP.BHC -999.250
TNPH. CNL -99'9.2 50
RCFT. CNL -999.250
TENS. CNL -999.2 50
NPOR.CSG -999.250
CFTC.CSG 298.374
DEPT. 11900.000
SP.OIt -999.250
TT1.BHC -999.250
SP.BHC -999.250
CENTER
28-JUN-lO89 13:03
ILO.OIL -999.250 iLM.DIL -999.
GR.OIL -999.250 TENS.OIL -999.
TT2.BHC -999.250 TT3.BHC -999.
GR.~HC -999.250 TENS.BHC -999.
TNRA.CNL -999.250 NPOR.CNL -999.
CNTC.CNL -999.250 CFTC.CNL -999.
NPHI.CSG 55.352 TNPH.CSG -999.
RCNT.CSG 1289.076 RCFT.CSG 310.
GR.CSG 69.313 TENS.CSG 4900.
iLD.DIL -999.250 ILM.DIL -999.
GR.DIL -999.250 TENS.OIL -999.
TT2.BHC -999.250 TT3.BHC -999.
GR.BHC -999.250 TENS.BHC -999.
TNRA.CNL -999.250 NPOR.CNL -999.
CNTC.CNL -999.250 CFTC.CNL -999.
NPHIoCSG 48.047 TNPH.CSG -999.
RCNT.CSG 1291.747 RCFT.CSG 261.
GR.CSG 64.?50 TENS.CSG 4944.
ILO.OIL .-999.250 ILM.DIL -999.
GR.DIL -999.250 TENS.DIL -999.
TTZ.BHC -999.250 TT3.BHC -999.
GR. BHC -999. 250 TENS. BHC -999.
TNRA.CNL -99'9. 250 NPOR.CNL -999.
CN'TC.CNL -999. 250 CFTC.CNL -999.
NPHI.CSG 49.96,3 TNPH.CSG -999.
RCNT.CSG 1342.111 RCFT.CSG 312.
GR.CSG 53.500 TENS.CSG .4884.
ILO.OIL -999.250 ILM.DIL -999.
GR.OIL -999.250 'TENS.DIL -999.
TTZ.BHC -999.250 TT3.BHC -999.
GR.BHC -999.250 TENS.BHC -999.
TNRA.CNL -999.250 NPDR.CNL -999.
CNTC.CNL -999. 250 CFTC.CNL -999.
NPHI.CSG 52. 645 TNPH.CSG -999.
RCNT.C.SG 1342o212 RCFT.CSG 280.
GR.CSG 53.844 TENS.CSG 4900.
ILO.OIL -999.250 ILM.DIL -999.
OR.OIL -999.250 'TENS.OIL -999.
TT2.BHC -999.250 TT3.BHC -999.
GR.BHC -999.250 TENS.BHC -999.
TNRA.CNL -999.250 NPOR.CNL -999.
CNTC.CNL -999.250 CFTC.CNL -999.
NPHI.CSG 57.T88 TNPH.CSG -999.
RCNT.CSG l~05. T4T RCFT.CSG 260.
SR.CSg 6t.2B1 TENS.CSG 4888.
ILO.OIL
GR.DZL
TT2.BHC
GR.BHC
-999.250 ILM.DIL -999.
-999.250 TENS.OIL -999.
-999.250 TT3.BHC -999.
-999.250 TENS.BHC -999.
25O
25O
25O
25O
250
250
250
370
gO0
250
250
250
25O
25O
25O
25O
221
000
25O
250
25O
25O
25O
250
929
000
250
250
25'0
7_ 50
250
250
250
463
000
250
250
250
250
250
250
250
158
000
250
250
250
250
SFLU.DIL
DT.SHC
TT4.BHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT. BHC
TT4.BHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT4.BHC
NPHI.CNL
RCN'T.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT. BHC
TT4.SHC
NPHI.CNL
RCNT.'CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT4.SHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT~.~HC
NPHI.CNL
PAGE:
-999.250
-939.250
-999.250
-999.250
-999.250
-999.250
4.439
1351.609
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
4.038
1316.463
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
4.143
1341 .'/25
-939.250
-999.250
-999.250
-999.250
-999.250
-999.250
4.291
1307.187
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
4.5'73
1300.268
-999.250
-999.2510
-999.250
-999.250
12
TAPE VERIFIC~TIDN LISTING
CHLUMBERGER ~LASK~ CgMPJTING CENTE~
2B-JUN-1989 13:03
TNPH.CNL -999.250 TNRA.CNL -999.250 NPOR.CNL
RCFT.CNL -999.250 C~TC.CNL -999.250 CFTC.CNL
TENS.CNL -999.250 NPHI.CSG 51.541 TNmH.CSG
NPOR.CSG -999.250 RCNT.CSG 1266.067 PCFT.CSG
CFTC.CSG 310.515 GR.CSG 52.063 TENS.CSG
DEPT. 1180'0.000 ILD.DIL -999.250 ILM.DIL
SP.DIL -999.250 GR.DIL -999. 250 TENS.DIL
TT1.BHC -999.250 TT2.BHC -999.250 TT3.BHC
SP.BHC -999.250 GR.BHC -999.250 TENS.BHC
TNPH.CNL -999.250 TNRA.CNL -999.250 NPOR.CNL
RCFT.CNL -999.250 CNTC.CNL -999.250 CFT£.CNL
TENS.CNL -999.250 NPHI.CSG 52.14I TNPH.CSG
NPDR.CSG -999.250 RCNT.CSG 1341.899 RCFT.CSG
CFTC.CSG 323.467 GR.CSG 58.156 TENS.CSG
DEPT. 11700.000 ILD.DIL -999.250 ILM.D!L
SP.DIL -999.250 GR.DIL -999.250 TENS.DIL
TT1.BHC -999.250 TTZ.BHC -999.250 TT3.BHC
SP.BHC -999.250 GR.~HC -999.250 TENS.BHC
TNPH.CNL -999.250 TNR~.CNL -999.250 NPOR.CNL
RCFT.CNL -999.250 CNTC.CNL -999.25.0 CFTC.CNL
TENS.CNL -999.250 NPHI.CSG 55.156 TNPHoCSG
NPOR.CSG -999.250 RCNT.CSG 1206.901 RCFT.CSG
CFTC.CSG 296.417 GR.CSG 68. B13 TENS.CSG
DEPT. 11600.000 ILD.DIL -999.250 ILM.DIL
SP.DIL -999.250 GR.DIL -999.250 TENS.DIL
'TT1. BHC -999.250 TT2.BHC -999.250 TT3.BHC
SP.BHC -999.250 GR.BHC -999.250 TENS.BHC
TNPH.CNL -999.250 TNRA.CNL -999.250 NPOR.CNL
RCFT.CNL -999.250 CNTC.CNL -999.250 CFTC.CNL
'TENS.CNL -999.250 NPHI.CSG 54.247 TNPH.CSG
NPOR.CSG -999.250 RCNT.CSG 1211.230 RCFT.CSG
CFTC.CSG 310.988 GR.CSG 7O.OOO TENS.CSG
DEPT. 11500.000 ILD.DIL -99'9. 250 ILM.DIL
SP.DIL -999.250 GR.DIL -999.250 TENS.DIL
'TTI.BHC -999.250 TT2.BHC -999.250 T'T3. BHC
SP.BHC -999.250 'GR.~HC -999. 250 TENS.BHC
TNPH.CNL -999.250 TNRA.CNL -999.250 NPOR.CNL
RCFT.CNL -999.250 CNTC.CNL -999.,250 CFTC.CNL
TENS.CNL -999.250 NPHI.CSG 62.092 TNPH.CSG
NPOR.CSG -999.250 RCNT.CSG 1319.078 RCFT.CSG
CFTC.CSG 2~9.B40 GR.CSG 87.938 TENS.CSG
DEPT. 11400.000 ILD.DIL -999.250 ILM.DIL
SP.DIL -999-250 GR.DIL -999.250 TENS.DIL
TT1.BHC -999.250 TTZ.BHC -999.250 TT3. BHC
SP.BHC -999.250 GR.BHC -999.250 TENS.BHC
TNPH.CNL -999.250 TNRA.CNL -999.250 NPOR.CNL
RCFT.CNL -999.250 CNTC.CNL -999.250 CFTC.CNL
TENS.CNL -999.250 NPHI.CSG 53.90-9 ~TNPH.CSG
NPOR.CSG -999.250 RCNT.CSG 1327.504 RCFT.CSG
CFTC.CSG 315.404 G~.CSG 125. 125 TENS..CSG
-999.250
-999.250
-999.250
299.489
484~.000
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
28 3. 980
4792.000
-999. 250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
215.201
4T84.000
-999.250
-999.250
-999.250
-999. ~50
-999. 250
-999.250
--999.250
316.846
472 O. 0 O0
-999.250
-999.Z50
--999.250
-999. 250
-999. 250
-999.250
--999.~50
237.203
4648.000
-999.250
-999. 250
-999.250
.-999.250
-999.250
-999.~.50
-999.250
251.528
4624.000
RCNT .CNL
GR .CNL
TNRA.CSG
CNTC .CSG
SFLU.DIL
DT.BHC
TT4.BHC
NPHI .CN[
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT. BHC
TT4.BHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRa.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT4 .BHC
NPHI
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT4.8HC
NPHI.CNL
RCNT.CNL
G R. CNL
TNRA.CSG
CN?C.CSG
SF:LU. OIL
DT.BHC
TT4.BHC
NPHI .CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC .CSG
PAGE: 13
-999.250
-999.250
.4.235
1303.121
-9'99.250
-999.250
-999.250
-999.250
-999.250
-999.250
4.263
1343.?02
-999.2~0
-999.250
-999.Z50
-999.Z50
-999.250
-999.250
4.428
1291.358
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
4.378
1275.728
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
4.809
1294.708
-999.250
-999.250
-999.250
-999.250
-999.250
-999.25'0
4.360
1330.465
TAPE VERIFICATION LISTING
CHLUMBERGER ALASK~ CCMPUTING CENTER
2B-JUN-lOB9 13:03
PAGE:
DEPT. 11300. 000 ILD.DIL
SP.DIL -999.250 GR.DIL
TT1. BHC -999.250 T'T2. BHC
SP.BHC -999.250 GR.BHC
TNPH.CNL -999.250 TNRA.CNL
RCFT.CNL -999. 250 CNTC.CNL
TENS.CNL -999.250 NPHI.CSG
NPOR.CSG -999.250 RCNT.CSG
CFTC. CSG 305. 532 GR.CSG
DEPT. 11296. 500 ILO.OIL
SP. OIL -999.2 50 GR. OIL
TT1. BHC -999.2 50 TT2. BHC
SP.~HC -999.250 GR.BHC
TNPH.CNL -999.250 TNRA.CNL
RCFT.CNL -999.250 CNTC.CNL
TENS.CNL -999.250 NPHI.CSG
NPOR.CSG -999.250 RCNT.CSG
CFTC.CSG 294.368 GR. CSG
-999.250 ILMoDIL -999.250
-999.25-9 TENS.OIL -999.250
-999.250 TT3.BHC -999.250
-999.250 TENS.BHC -999.250
-999.250 NPOR.CNL -999.250
-999.250 CFTC.CNL -999.250
51.605 TNPH.CSG -999.250
1216.350 RCFT.CSG 282.798
90.875 TENS.CSG 4568.000
-999.250 ILM.DIL -999.250
-999.250 TENS.DIL -999.250
-999.250 TT3.BHC -999.250
-999.250 TENS.~HC -999.250
-999.250 NPOR.CNL -999.250
-999.250 CFTC.CNL -999.250
53.03T TNPH.CSG -999.250
1162.610 RCFT.CSG 314.875
112.125 TENS.CSG 4552.000
SFLU.OIL
DT.SHC
TT4.BHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
SFLU.DIL
DT.BHC
TT4.BHC
NPHI.CNL
RCNT.CNL
GR.CNL
TNRA.CSG
CNTC.CSG
-999.250
-999.250
-999.250
-999.250
-999.250
-9')9.250
4.233
1239.689
-999.250
-999.250
-999.250
-999.250
'999.250
-999.250
4.312
1272.213
END OF DATA
~ FILE TRAILER
FILE NAME ' EOlT .001
SERVICE : FLIC
VERSION :
DATE : 89/06/27
MAX REC SIZE : 1096
FILE TYPE :
LAST FILE :
· ~-~-~ T,~PE TRAILER
SERVICE NAME :' ~DIT
DATE : 89/0i6/27
ORIGIN : ~:LIC
TAPE NAME : 7~383
CONTINUATION N :
PREVIOUS TAPE :
COMMENT : BP ,~RUDH~E BAY,
W-09
(41-32-11-12),API
~50-029-21947
~ REEL TR~ILER ~'~
SERVICE N~E : EDIT
DATE : 89/06/27
ORIGIN : ~LIC
REEL N~ME : 73383
CONTINUATION ~ :
PREVIOUS REEL :
COMMENT : 3P ,',~RUDH~E BAY,
W-09
(41-32-11-12) ,API
~50--029-21947