Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout196-100MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Tuesday, January 16, 2024 SUBJECT:Mechanical Integrity Tests TO: FROM:Sully Sullivan P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp Alaska, LLC F-18 MILNE PT UNIT F-18 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 01/16/2024 F-18 50-029-22681-00-00 196-100-0 W SPT 7049 1961000 1762 2208 2211 2211 2212 749 960 955 951 INITAL P Sully Sullivan 11/27/2023 This is the initial test for this producer turned into injector. Operator tested to 2700 psi for txia differential 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:MILNE PT UNIT F-18 Inspection Date: Tubing OA Packer Depth 1136 2760 2740 2736IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSTS231130054137 BBL Pumped:2.2 BBL Returned:2.2 Tuesday, January 16, 2024 Page 1 of 1          Well status changed to 1WINJ 3/30/2021 and SI since conversion. Date put on injection unknown. - J. Regg (1/16/2024) CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Rixse, Melvin G (OGC) To:Carlisle, Samantha J (OGC); Guhl, Meredith D (OGC) Subject:FW: MP F-18 PTD: 196-100 / Sundry #: 321-024 Withdrawal Request Date:Tuesday, March 8, 2022 8:48:21 AM     From: Tom Fouts <tfouts@hilcorp.com>  Sent: Tuesday, March 8, 2022 8:46 AM To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Cc: Taylor Wellman <twellman@hilcorp.com>; David Haakinson <dhaakinson@hilcorp.com>; Darci Horner <dhorner@hilcorp.com> Subject: MP F-18 PTD: 196-100 / Sundry #: 321-024 Withdrawal Request   Mel,   Hilcorp Alaska LLC request to withdraw sundry number 321-024 for MP F-18.  Please feel free to contact me with any questions.   Regards,   Tom Fouts | Senior Ops/ Reg Tech Hilcorp Alaska, LLC tfouts@hilcorp.com Direct: (907) 777-8398 Mobile: (907) 351-5749     The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.   Samuel Gebert Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 Fax: 907 777-8510 E-mail: sam.gebert@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: DATE: 03/29/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU F-18 (PTD 196-100) Cement Bond Log 03/17/2021 Please include current contact information if different from above. PTD: 196100 E-Set: 34839 Received by the AOGCC 03/30/2021 03/30/2021 7\SHRI5HTXHVW $EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 5HSDLU:HOO 2SHUDWLRQVVKXWGRZQ 6XVSHQG 3HUIRUDWH 2WKHU6WLPXODWH 3XOO7XELQJ &KDQJH$SSURYHG3URJUDP 3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 5HHQWHU6XVS:HOO $OWHU&DVLQJ 2WKHU3UHSIRU&7' 2SHUDWRU1DPH&XUUHQW:HOO&ODVV3HUPLWWR'ULOO1XPEHU ([SORUDWRU\'HYHORSPHQW $GGUHVV6WUDWLJUDSKLF 6HUYLFH $3,1XPEHU ,ISHUIRUDWLQJ:HOO1DPHDQG1XPEHU :KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO" :LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ"<HV 1R 3URSHUW\'HVLJQDWLRQ /HDVH1XPEHU )LHOG3RRO V   7RWDO'HSWK0' IW  7RWDO'HSWK79' IW  (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363 SVL 3OXJV 0' -XQN 0'    &DVLQJ &ROODSVH &RQGXFWRU 1$ 6XUIDFH SVL 3URGXFWLRQ SVL 3DFNHUVDQG66697\SH3DFNHUVDQG66690' IW DQG79' IW  $WWDFKPHQWV 3URSRVDO6XPPDU\ :HOOERUHVFKHPDWLF :HOO&ODVVDIWHUSURSRVHGZRUN 'HWDLOHG2SHUDWLRQV3URJUDP %236NHWFK ([SORUDWRU\6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH (VWLPDWHG'DWHIRU :HOO6WDWXVDIWHUSURSRVHGZRUN &RPPHQFLQJ2SHUDWLRQV2,/:,1-:'63/6XVSHQGHG 9HUEDO$SSURYDO'DWH*$6 :$**6725 63/8* &RPPLVVLRQ5HSUHVHQWDWLYH*,1-2S6KXWGRZQ $EDQGRQHG &KDG+HOJHVRQ &RQWDFW1DPH 'DYLG*RUP 2SHUDWLRQV0DQDJHU &RQWDFW(PDLO &RQWDFW3KRQH  'DWH &RQGLWLRQVRIDSSURYDO1RWLI\&RPPLVVLRQVRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU 3OXJ,QWHJULW\%237HVW 0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH 2WKHU 3RVW,QLWLDO,QMHFWLRQ0,75HT G"<HV 1R 6SDFLQJ([FHSWLRQ5HTXLUHG"<HV 1R 6XEVHTXHQW)RUP5HTXLUHG $33529('%< $SSURYHGE\&200,66,21(5 7+(&200,66,21 'DWH &RPP&RPP6U3HW(QJ 6U3HW*HR 6U5HV(QJ 0,/1(3781,7) &2' 1$DQG1$1$DQG1$ $XWKRUL]HG7LWOH ,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRW EHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO $XWKRUL]HG6LJQDWXUH   3HUIRUDWLRQ'HSWK0' IW  6HH6FKHPDWLF 6HH6FKHPDWLF       3HUIRUDWLRQ'HSWK79' IW  SVL SVL     1$ 0,/1(32,17),(/'.83$58.5,9(52,/322/   /(8(UG 79' %XUVW  0' 1$ /HQJWK 6L]H     35(6(17:(//&21',7,216800$5< 67$7(2)$/$6.$ $/$6.$2,/$1'*$6&216(59$7,21&200,66,21 $33/,&$7,21)25681'5<$33529$/6 $$& $'/  &HQWHUSRLQW'U6XLWH$QFKRUDJH$. +LOFRUS$ODVND//& GJRUP#KLOFRUSFRP 7XELQJ*UDGH7XELQJ0' IW  &200,66,2186(21/< $XWKRUL]HG1DPH 7XELQJ6L]H  RU\ 6WDWX )RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO By Jody Colombie at 2:40 pm, Jan 14, 2021  &KDG+HOJHVRQ      MGR29JAN21 DLB ADL0388235 DLB X BOPE test to 3000 psi. Annular test to 2500 psi. ; ADL0025509 10-404 DLB 01/14/2021 X DSR-1/14/21& SWLRQ5HTXLUHG"<HV 2/1/21 dts 2/01/2021 JLC 2/1/2021 X mgr01feb21 RBDMS HEW 2/2/2021 t/E:ŽŶǀĞƌƐŝŽŶ tĞůů͗DWh&Ͳϭϴ ĂƚĞ͗ϭͲϭϯͲϮϬϮϭ tĞůůEĂŵĞ͗DWh&Ͳϭϴ W/EƵŵďĞƌ͗ ϱϬͲϬϮϵͲϮϮϲϴϭ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗^WWƌŽĚƵĐĞƌ WĂĚ͗&ͲWĂĚ ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗DĂƌĐŚϳƚŚ ͕ϮϬϮϭ ZŝŐ͗ŽLJŽŶϭϰ ZĞŐ͘ƉƉƌŽǀĂů ZĞƋ͛Ě͍zĞƐ ĂƚĞ ZĞŐ͘ƉƉƌŽǀĂů ZĞĐ͛ǀĚ͗ ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗dŽŵ&ŽƵƚƐ WĞƌŵŝƚƚŽƌŝůůEƵŵďĞƌ͗ϭϵϲͲϭϬϬ &ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗ĂǀŝĚ'Žƌŵ ;ϵϬϳͿϳϳϳͲϴϯϯϯ ;KͿ ;ϱϬϱͿ ϮϭϱͲϮϴϭϵ ;DͿ ^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗/ĂŶdŽŽŵĞLJ ;ϵϬϳͿϳϳϳͲϴϱϮϬ;KͿ ;ϵϬϳͿϵϬϯͲϯϵϴϳ;DͿ &EƵŵďĞƌ͗tĞůůŶƚƌŝĞƐZĞƋƵŝƌĞĚ zĞƐ ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ͗ϯ͕ϮϬϲƉƐŝΛϳ͕ϭϳϬ͛ds ^,W͗ϴ͘ϲWW' DĂdžŝŵƵŵdžƉĞĐƚĞĚ,W͗ϯ͕ϮϬϲƉƐŝΛϳ͕ϭϳϬ͛ds ^,W͗ϴ͘ϲWW' DW^W͗Ϯ͕ϰϴϵƉƐŝ 'ĂƐŽůƵŵŶ'ƌĂĚŝĞŶƚ;Ϭ͘ϭƉƐŝͬĨƚͿ DĂdž/ŶĐůŝŶĂƚŝŽŶ ϳϭΣΛϯ͕ϳϬϬ͛Ͳϭϯ͕ϯϬϬ͛D DŝŶ/͗Ϯ͘ϮϬϱ͟/yEĂƚϭϰ͕ϭϭϳ͛D ƌŝĞĨtĞůů^ƵŵŵĂƌLJ͗ DWh&ͲϭϴǁĂƐĚƌŝůůĞĚŝŶϭϵϵϲĂŶĚĐŽŵƉůĞƚĞĚĂƐĂ<ƵƉĂƌƵŬZŝǀĞƌ^WƉƌŽĚƵĐĞƌ͘dŚĞĨŝƌƐƚ^WǁĂƐŝŶƐƚĂůůĞĚϭϵϵϲ͘ DW&ͲϭϴŚĂƐŚĂĚŵƵůƚŝƉůĞ^WƐŝŶƐƚĂůůĞĚ͗:ƵůLJϮϬϬϭ͕:ƵŶĞϮϬϬϰ͕:ƵůLJϮϬϬϴ͕:ƵŶĞϮϬϭϮ͕ƉƌŝůϮϬϭϱ͕ĂŶĚDĂƌĐŚ ϮϬϭϴ͘ EŽƚĞƐZĞŐĂƌĚŝŶŐtĞůůďŽƌĞŽŶĚŝƚŝŽŶ x WĂƐƐŝŶŐD/dͲ/ƚŽϯϱϬϬƉƐŝŝŶϮϬϭϮ KďũĞĐƚŝǀĞ͗ x WƵůůĞdžŝƐƚŝŶŐ^WĐŽŵƉůĞƚŝŽŶ͘ x KďƚĂŝŶ>͕ŽŶĨŝƌŵDd/ƐŽůĂƚŝŽŶ x /ŶƐƚĂůůŶĞǁϰͲϭͬϮ͟ǁĂƚĞƌŝŶũĞĐƚŝŽŶĐŽŵƉůĞƚŝŽŶ͘ x ^ĞƚǁŚŝƉƐƚŽĐŬĨŽƌĐŽŝůĞĚƚƵďŝŶŐĚƌŝůůŝŶŐ ^ƵŶĚƌLJWƌŽĐĞĚƵƌĞ;ƉƉƌŽǀĂůZĞƋƵŝƌĞĚƚŽWƌŽĐĞĞĚͿ WƌĞͲZŝŐWƌŽĐĞĚƵƌĞ ϭ͘ ůĞĂƌĂŶĚůĞǀĞůƉĂĚĂƌĞĂŝŶĨƌŽŶƚŽĨǁĞůů͘^ƉŽƚƌŝŐŵĂƚƐĂŶĚĐŽŶƚĂŝŶŵĞŶƚ͘ Ϯ͘ ZǁĞůůŚŽƵƐĞĂŶĚĨůŽǁůŝŶĞƐ͘ůĞĂƌĂŶĚůĞǀĞůĂƌĞĂĂƌŽƵŶĚǁĞůů͘ ϯ͘ Zh>ŝƚƚůĞZĞĚ^ĞƌǀŝĐĞƐ͘ZhƌĞǀĞƌƐĞŽƵƚƐŬŝĚĂŶĚϱϬϬďďůƌĞƚƵƌŶƐƚĂŶŬ͘ ϰ͘ WƌĞƐƐƵƌĞƚĞƐƚůŝŶĞƐƚŽϯ͕ϬϬϬƉƐŝ͘ ϱ͘ ZĞǀŝĞǁǁĞůůŬŝůůƉůĂŶǁŝƚŚŶŐŝŶĞĞƌďĂƐĞĚŽŶĐƵƌƌĞŶƚǁĞůůĐŽŶĚŝƚŝŽŶƐ͘ ϲ͘ ŝƌĐƵůĂƚĞǁĞůůďŽƌĞǀŽůƵŵĞ;ΕϱϬϱ>^ͿǁŝƚŚĐĂůĐƵůĂƚĞĚŬŝůůĨůƵŝĚďĂƐĞĚŽŶƵƉĚĂƚĞĚǁĞůůƉƌĞƐƐƵƌĞƐ͕ ĚŽǁŶƚƵďŝŶŐ͕ƚĂŬŝŶŐƌĞƚƵƌŶƐƵƉĐĂƐŝŶŐƚŽϱϬϬďďůŽƉĞŶƚŽƉƌĞƚƵƌŶƐƚĂŶŬ͘DŽŶŝƚŽƌǁĞůůĨŽƌƌĞƚƵƌŶƐ ĚƵƌŝŶŐƚŚĞǁĞůůŬŝůů͘ ϳ͘ ŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚ͘ ϴ͘ Z>ŝƚƚůĞZĞĚ^ĞƌǀŝĐĞƐĂŶĚƌĞǀĞƌƐĞŽƵƚƐŬŝĚ͘ t/E:ŽŶǀĞƌƐŝŽŶ tĞůů͗DWh&Ͳϭϴ ĂƚĞ͗ϭͲϭϯͲϮϬϮϭ ZtKWƌŽĐĞĚƵƌĞ͗ ϵ͘ D/ZhŽLJŽŶϭϰZŝŐ͕ĂŶĐŝůůĂƌLJĞƋƵŝƉŵĞŶƚ͕ĂŶĚůŝŶĞƐƚŽƌĞƚƵƌŶƐƚĂŶŬ͘ ϭϬ͘ ^ĞƚWs͘EdƌĞĞ͘EhKW͘ ϭϭ͘ /ĨŶĞĞĚĞĚ͕ďůĞĞĚŽĨĨĂŶLJƌĞƐŝĚƵĂůƉƌĞƐƐƵƌĞŽĨĨƚŚĞ/͘ŚĞĐŬĨŽƌƉƌĞƐƐƵƌĞĂŶĚŝĨϬƉƐŝ͕ƉƵůůWs͘/Ĩ ŶĞĞĚĞĚ͕ŬŝůůǁĞůůǁͬƵƉĚĂƚĞĚ<ŝůů&ůƵŝĚ ƉƌŝŽƌƚŽƉƵůůŝŶŐWs͘ ϭϮ͘ ^Ğƚdt͘ ϭϯ͘ dĞƐƚKWƚŽϮϱϬƉƐŝ>Žǁͬϯ͕ϬϬϬƉƐŝ,ŝŐŚ͕ĂŶŶƵůĂƌƚŽϮϱϬƉƐŝ>ŽǁͬϮ͕ϱϬϬƉƐŝ,ŝŐŚ;ŚŽůĚĞĂĐŚƌĂŵͬǀĂůǀĞ ĂŶĚƚĞƐƚĨŽƌϱͲŵŝŶͿ͘ZĞĐŽƌĚĂĐĐƵŵƵůĂƚŽƌƉƌĞͲĐŚĂƌŐĞƉƌĞƐƐƵƌĞƐĂŶĚĐŚĂƌƚƚĞƐƚƐ͘ Ă͘ EŽƚŝĨLJK'ϮϰŚŽƵƌƐŝŶĂĚǀĂŶĐĞŽĨKWƚĞƐƚ͘ ď͘ ŽŶĨŝƌŵƚĞƐƚƉƌĞƐƐƵƌĞƐƉĞƌƚŚĞ^ƵŶĚƌLJŽŶĚŝƚŝŽŶƐŽĨĂƉƉƌŽǀĂů͘ Đ͘ dĞƐƚsZƌĂŵŽŶϮͲϳͬϴ͟ĂŶĚϰͲϭͬϮ͟ƚĞƐƚũŽŝŶƚƐ͘ Ě͘ ^ƵďŵŝƚƚŽK'ĐŽŵƉůĞƚĞĚϭϬͲϰϮϰĨŽƌŵǁŝƚŚŝŶϱĚĂLJƐŽĨKWƚĞƐƚ͘ Ğ͘ /Ĩd'ŚĂŶŐĞƌůĞĂŬ͕ĐŽŶĚƵĐƚĂƌŽůůŝŶŐKWƚĞƐƚƵŶƚŝů,ĂŶŐĞƌĐĂŶďĞƉƵůůĞĚƌĞƉĂŝƌĞĚĂŶĚƌĞͲ ƚĞƐƚ͘ ϭϰ͘ ůĞĞĚĂŶLJƉƌĞƐƐƵƌĞŽĨĨĐĂƐŝŶŐ͘WƵůůdt͘<ŝůůǁĞůůǁͬƵƉĚĂƚĞĚ<ŝůů&ůƵŝĚ ĂƐŶĞĞĚĞĚ͘ ϭϱ͘ ZŝŐƵƉƐƉŽŽůĞƌƐĨŽƌ^WĐĂďůĞ͘ ϭϲ͘ DhůĂŶĚŝŶŐũŽŝŶƚŽƌƐƉĞĂƌ͕K>^ĂŶĚWhŽŶƚŚĞƚƵďŝŶŐŚĂŶŐĞƌ͘ Ă͘ ƐƚŝŵĂƚĞϭϮϬ<ͲůďƐWhtƚ͘ǁͬŶŽůƵďƌŝĐĂƚĞĚĨůƵŝĚ;EŽƚĞ͗DĂdžWƵůůŽŶϮͲϳͬϴ͟ŽŶŶĞĐƚŝŽŶ͗ ϭϰϰ<ͲůďƐͿ ď͘ /ĨŶĞĞĚĞĚ͕ĐŝƌĐƵůĂƚĞ;ůŽŶŐŽƌƌĞǀĞƌƐĞͿƉŝůůǁŝƚŚůƵďƌŝĐĂŶƚƉƌŝŽƌƚŽůĂLJŝŶŐĚŽǁŶƚŚĞƚƵďŝŶŐ ŚĂŶŐĞƌ͘ ϭϳ͘ >ĂLJĚŽǁŶƚƵďŝŶŐŚĂŶŐĞƌ͘ ŽŶƚŝŶŐĞŶĐLJ;/ĨĂƌŽůůŝŶŐƚĞƐƚǁĂƐĐŽŶĚƵĐƚĞĚͿ͗DhŶĞǁŚĂŶŐĞƌŽƌƚĞƐƚƉůƵŐƚŽƚŚĞ ĐŽŵƉůĞƚŝŽŶƚƵďŝŶŐ͘ZĞͲůĂŶĚŚĂŶŐĞƌ;ŽƌƚĞƐƚƉůƵŐͿŝŶƚƵďŝŶŐŚĞĂĚ͘dĞƐƚKWƉĞƌƐƚĂŶĚĂƌĚ ƉƌŽĐĞĚƵƌĞ͘ ϭϴ͘ WKK,ϭϬũƚƐŽĨϮͲϳͬϴ͟d'͕ĐƵƚĂŶĚƐĞĐƵƌĞĐĂďůĞͬĐŽŶƚƌŽůůŝŶĞƚŽƚŚĞd'͘ ϭϵ͘ Whϳ͟Zdd^͕DhƉĂĐŬĞƌƚŽϮͲϳͬϴ͟^ƚƌŝŶŐ ϮϬ͘ Z/,ĂŶĚƐĞƚƚŚĞƉĂĐŬĞƌĂƚнͬͲϲϬ͛ďĞůŽǁƚŚĞt, Ϯϭ͘ sĞƌŝĨLJtĞůůŝƐŝƐŽůĂƚĞĚ͘ ϮϮ͘ EKW͕Ed'^ƉŽŽů Ϯϯ͘ EhEĞǁd'^ƉŽŽů͕tĞůůŚĞĂĚ^ƉĞĐŝĂůŝƐƚǁŝůůƚĞƐƚƉĂĐŬͲŽĨĨĂŶĚůŽǁĞƌĨůĂŶŐĞĚĐŽŶŶĞĐƚŝŽŶƚŽϱϬϬϬη͘ Ϯϰ͘ EhKW͕ƐĞƚƚĞƐƚƉůƵŐ͕ƐŚĞůůdĞƐƚKWƚŽϮϱϬƉƐŝ>Žǁͬϯ͕ϬϬϬƉƐŝ,ŝŐŚƚŽƚĞƐƚĐŽŶŶĞĐƚŝŽŶƚŽƚŚĞŶĞǁ ƐƉŽŽů͘ Ϯϱ͘ WƵůůƚŚĞdĞƐƚWůƵŐ͕Z/,ƌĞůĞĂƐĞĂŶĚƉƵůůƚŚĞZdd^ƉĂĐŬĞƌ͘ Ϯϲ͘ WKK,ĂŶĚůĂLJĚŽǁŶƚŚĞϮͲϳͬϴ͟ƚƵďŝŶŐǁŚŝůĞƐƉŽŽůŝŶŐ^WĐĂďůĞ͘>ĂLJĚŽǁŶ^WĂŶĚŵŽƚŽƌ͘ Ă͘ EŽƚĞĂŶLJƐĂŶĚŽƌƐĐĂůĞŝŶƐŝĚĞŽƌŽŶƚŚĞŽƵƚƐŝĚĞŽĨƚŚĞ^WŝŶt^Z͘ WƵůůĞĚƋƵŝƉŵĞŶƚŝƐƉŽƐŝƚŝŽŶ dƵďŝŶŐŚĂŶŐĞƌ sŝƐƵĂůůLJŝŶƐƉĞĐƚŽŶƐŝƚĞƚŚĞŶƌĞͲƐƚŽĐŬ dƵďŝŶŐΘWƵƉũŽŝŶƚƐ :ƵŶŬ ^WĂďůĞ :ƵŶŬ t/E:ŽŶǀĞƌƐŝŽŶ tĞůů͗DWh&Ͳϭϴ ĂƚĞ͗ϭͲϭϯͲϮϬϮϭ '>D^sŝƐƵĂůůLJŝŶƐƉĞĐƚŽŶƐŝƚĞƚŚĞŶƌĞͲƐƚŽĐŬ ^WƋƵŝƉŵĞŶƚ sŝƐƵĂůůLJŝŶƐƉĞĐƚŽŶƐŝƚĞƚŚĞŶƉƌŽǀŝĚĞƚŽĂŬĞƌĨŽƌƐĐƌĂƉ ůĂŵƉƐ sŝƐƵĂůůLJŝŶƐƉĞĐƚŽŶƐŝƚĞƚŚĞŶƌĞͲƐƚŽĐŬ yEEŝƉƉůĞ sŝƐƵĂůůLJŝŶƐƉĞĐƚŽŶƐŝƚĞƚŚĞŶƌĞͲƐƚŽĐŬ Ϯϳ͘ ZhͲůŝŶĞ Ϯϴ͘ Z/,dƌĂĐƚŽƌͬ>ĂŶĚ>ŽŐƵƉĨƌŽŵϭϰ͕ϰϯϰ͛D͘;ZĞǀŝĞǁ>ZĞƐƵůƚƐǁŝƚŚKďĞĨŽƌĞƌƵŶŶŝŶŐĐŽŵƉůĞƚŝŽŶ͘Ϳ Ϯϵ͘ ZͲůŝŶĞ ϯϬ͘ WhĂŶĚZ/,ǁϰ͘ϱ͟ϭϮ͘ϲη>ͲϴϬŝŶũĞĐƚŝŽŶĐŽŵƉůĞƚŝŽŶĂŶĚƉĂĐŬĞƌ͘ŶƐƵƌĞƵƐƚŝƐŬŝƐƌƵŶďĞůŽǁƚŚĞ ƉĂĐŬĞƌ͘ŽŶĨŝƌŵƚŚĞǁĞůůŝƐƐƚĂƚŝĐďĞĨŽƌĞd/,ǁŝƚŚ,͘;EŽƚĞ͗dŽƉ&ŝůůƚŚĞϰ͘ϱ͟d'ǁŚŝůĞd/,͕ƵƌƐƚĚŝƐŬ ǁŝůůƉƌĞǀĞŶƚĐŝƌĐƵůĂƚŝŽŶĚŽǁŶƚŚĞd'͘Ϳ ϯϭ͘ WƌŽƉŽƐĞĚZƵŶŶŝŶŐKƌĚĞƌ Ă͘ t>';dĂƌŐĞƚϭϰ͕ϯϯϬ͛Ϳ ď͘ DĂŐŶƵŵƵƌƐƚŝƐŬ;ϰ͕ϱϬϬƉƐŝͿ Đ͘ Ϯ&Ƶůů:ŽŝŶƚƐŽĨϰͲϭͬϮ͟ϭϮ͘ϲη>ͲϴϬd' Ě͘ ϰͲϭͬϮ͟yEŝƉƉůĞ;ϯ͘ϴϭϯ͟/Ϳ Ğ͘ ϭ:ŽŝŶƚϰͲϭͬϮ͕͟ϭϮ͘ϲη>ͲϴϬƚƵďŝŶŐ Ĩ͘ WĂĐŬĞƌƐĞƚΛнͬͲϭϰ͕ϮϯϮ͛D;ϮϬϬ͛DĂďŽǀĞƚŚĞƉůĂŶŶĞĚtŚŝƉƐƚŽĐŬƐĞƚĚĞƉƚŚĨŽƌdͿ Ő͘ ΕϯϳϮũƚƐŽĨϰͲϭͬϮ͕͟ϭϮ͘ϲηƚƵďŝŶŐ Ś͘ ϰͲϭͬϮ͟yEŝƉƉůĞ;ϯ͘ϴϭϯ͟/ͿΛцϮ͕ϯϬϬ͛D ŝ͘ ΕϳϮũƚƐŽĨϰͲϭͬϮ͕͟ϭϮ͘ϲηƚƵďŝŶŐ ϯϮ͘ ƵůůŚĞĂĚϮϲϱďďůƐĐůĞĂŶƐŽƵƌĐĞǁĂƚĞƌǁͬĐŽƌƌŽƐŝŽŶŝŶŚŝďŝƚŽƌĂŶĚϰϯďďůƐĚŝĞƐĞůĨƌĞĞnjĞƉƌŽƚĞĐƚĚŽǁŶƚŚĞ /ƉƌŝŽƌƚŽƐĞƚƚŝŶŐƚŚĞƉĂĐŬĞƌ Ă͘ &ƌĞĞnjĞƉƌŽƚĞĐƚĂŶŶƵůĂƌǀŽůƵŵĞс͘ϬϮϲďƉĨΎϮ͕ϯϬϬ͛сϰϯďďůƐ͘ ϯϯ͘ ^ƉĂĐĞŽƵƚƚŽƐĞƚƉĂĐŬĞƌĂƚцϭϰ͕ϮϯϮ͛ĂŶĚůĂŶĚƚŚĞƚƵďŝŶŐŝŶƚŽƚŚĞŚĂŶŐĞƌ͘Z/>^͘>ĂLJĚŽǁŶůĂŶĚŝŶŐũŽŝŶƚ͘ Ă͘ WĂĐŬĞƌƐĞƚǁŝƚŚŝŶϮϬϬ͛DŽĨƚŚĞƉƌŽƉŽƐĞĚǁŚŝƉƐƚŽĐŬƐĞƚƚŝŶŐĚĞƉƚŚŽĨϭϰ͕ϰϯϮ͛D͘ ď͘ t>'ƉůĂĐĞĚΕϭϬϬ͛ĂďŽǀĞƉƌŽƉŽƐĞĚt^ƐĞƚƚŝŶŐĚĞƉƚŚ Đ͘ EŽƚĞWh;WŝĐŬhƉͿĂŶĚ^K;^ůĂĐŬKĨĨͿǁĞŝŐŚƚƐŽŶƚĂůůLJ͘ ϯϰ͘ dĞƐƚƚƵďŝŶŐŚĂŶŐĞƌƚŽϮϱϬƉƐŝůŽǁͬϱ͕ϬϬϬƉƐŝ,ŝŐŚ͘ ϯϱ͘ WƌĞƐƐƵƌĞƵƉƚŚĞd'ƚŽŚLJĚƌĂƵůŝĐĂůůLJƐĞƚƚŚĞƉĂĐŬĞƌƉĞƌŵĂŶƵĨĂĐƚƵƌĞƌ͛ƐƐĞƚƚŝŶŐƉƌŽĐĞĚƵƌĞ;ĞƐƚŝŵĂƚĞĚ ϯ͕ϮϬϬƉƐŝͿ͘ ϯϲ͘ ŽŶĚƵĐƚD/dͲ/ƚŽϮ͕ϬϬϬƉƐŝ;Ϭ͘ϮϱƉƐŝͬϳ͕ϱϯϬ͛^ŚŽĞdsͿ͘ ŝ͘ EŽƚŝĨLJK'ĂƚůĞĂƐƚϮϰŚŽƵƌƐƉƌŝŽƌƚŽƉĞƌĨŽƌŵŝŶŐWƌĞ/ŶũĞĐƚŝŽŶD/dͲ/ ŝŝ͘ ^ƵďŵŝƚĐŽŵƉůĞƚĞĚWƌĞͲ/ŶũĞĐƚŝŽŶD/dͲ/ŽŶϭϬͲϰϮϲĨŽƌŵ ϯϳ͘ ŽŶĨŝƌŵƉĂƐƐŝŶŐ/ƉƌĞƐƐƵƌĞƚĞƐƚ͕ƉƌĞƐƐƵƌĞƵƉƚŚĞd'ƚŽƉƵŵƉŽĨĨƚŚĞDĂŐŶƵŵĚŝƐŬ;ĞƐƚŝŵĂƚĞĚϰ͕ϱϬϬ ƉƐŝͿ͘ ϯϴ͘ ^Ğƚdt͘ WŽƐƚͲZŝŐWƌŽĐĞĚƵƌĞ͗ ϯϵ͘ EhƚŚĞƚƵďŝŶŐŚĞĂĚĂĚĂƉƚĞƌĂŶĚƚƌĞĞ͘dĞƐƚƚƵďŝŶŐŚĂŶŐĞƌǀŽŝĚĂŶĚƚƌĞĞƚŽϱϬϬƉƐŝůŽǁͬϱ͕ϬϬϬƉƐŝŚŝŐŚ͘ ϰϬ͘ WƵůůdt͘ ϰϭ͘ ZĞƉůĂĐĞŐĂƵŐĞ;ƐͿŝĨƌĞŵŽǀĞĚ͘ CBL to AOGCC. t/E:ŽŶǀĞƌƐŝŽŶ tĞůů͗DWh&Ͳϭϴ ĂƚĞ͗ϭͲϭϯͲϮϬϮϭ ϰϮ͘ dƵƌŶǁĞůůŽǀĞƌƚŽƉƌŽĚƵĐƚŝŽŶ͘ZhǁĞůůŚŽƵƐĞĂŶĚĨůŽǁůŝŶĞƐ͘ ϰϯ͘ ^ůŝĐŬůŝŶĞƚŽĚƌŝĨƚĨŽƌǁŚŝƉƐƚŽĐŬƐĞƚƚŝŶŐ;ŚŝŐŚŝŶĐůŝŶĂƚŝŽŶǁĞůůͿ ϰϰ͘ ůŝŶĞƚŽƐĞƚϰͲϭͬϮ͟džϳ͟ǁŚŝƉƐƚŽĐŬĂƚϭϰ͕ϰϯϮ͛ĂŶĚϬZK,^͘/ĨƵŶĂďůĞƚŽƐĞƚĚƵĞƚŽŚŝŐŚǁĞůůďŽƌĞ ĚĞǀŝĂƚŝŽŶƚŚĞt^ǁŝůůďĞƐĞƚǁŝƚŚƚŚĞdƌŝŐ͘ ϰϱ͘ ^ĞĞWdĨŽƌ&ͲϭϴŽŝůdƵďŝŶŐ^ŝĚĞƚƌĂĐŬĨŽƌƚŚĞƌĞŵĂŝŶĚĞƌŽĨƚŚĞƉƌŽĐĞĚƵƌĞ͘ ƚƚĂĐŚŵĞŶƚƐ͗ ϭ͘ ƐͲďƵŝůƚ^ĐŚĞŵĂƚŝĐ Ϯ͘ WƌŽƉŽƐĞĚ^ĐŚĞŵĂƚŝĐ ϯ͘ KW^ĐŚĞŵĂƚŝĐ ϰ͘ ůĂŶŬZtKDK&Žƌŵ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB ZĞǀŝƐĞĚLJ͗d&ϳͬϮϵͬϮϬϮϬ ^,Dd/ DŝůŶĞWŽŝŶƚhŶŝƚ tĞůů͗DWh&Ͳϭϴ >ĂƐƚŽŵƉůĞƚĞĚ͗ϯͬϱͬϮϬϭϱ Wd͗ϭϵϲͲϭϬϬ dс ϭϰ͕ϵϰϭ͛;DͿͬdсϳ͕ϱϯϬ͛;dsͿ ϮϬ´ ´6KRUWMRLQWI ¶WR¶ 5$7DJ#¶ KƌŝŐ͘<ůĞǀ͗͘Ϯϴ͘Ϯϱ͛ͬ'>ůĞǀ͗͘ϭϮ͘ϰϬ͛;EϮϮͿ ϳ͟        ϵͲϱͬϴ͟   ϯͬϴ͟^^ĂƉƐƚƌŝŶŐ D/E/сϮ͘ϮϬϱ͟ Λϭϰ͕ϭϭϳ͛ Wdс ϭϰ͕ϴϯϰ͛;DͿͬWdсϳ͕ϰϱϲ͛;dsͿ  )LVK&HQWUDOL]HU SXVKHGWR¶.83 6DQGV   ^/E'd/> ^ŝnjĞ dLJƉĞ tƚͬ'ƌĂĚĞͬŽŶŶ / dŽƉ ƚŵ ϮϬΗ ŽŶĚƵĐƚŽƌ ϵϭ͘ϭͬ,ͲϰϬͬEͬ Eͬ ^ƵƌĨĂĐĞ ϭϭϮΖ ϵͲϱͬϴΗ ^ƵƌĨĂĐĞ ϰϬͬ>ͲϴϬͬƚƌĐ͘ ϴ͘ϴϯϱ ^ƵƌĨĂĐĞ ϳ͕ϵϭϰ͛ ϳΗ WƌŽĚƵĐƚŝŽŶ Ϯϲͬ>ͲϴϬͬƚƌĐ ϲ͘Ϯϳϲ ^ƵƌĨĂĐĞ ϭϰ͕ϵϭϱ͛ dh/E'd/> ϮͲϳͬϴ͟ dƵďŝŶŐ ϲ͘ϱͬ>ͲϴϬͬhϴƌĚ Ϯ͘ϰϰϭ ^ƵƌĨĂĐĞ ϭϰ͕ϮϮϰ͛ ϯͬϴ͟ ĂƉƐƚƌŝŶŐ ^ƚĂŝŶůĞƐƐ^ƚĞĞů Eͬ ^ƵƌĨĂĐĞ ϭϰ͕ϮϮϰ͛ :t>Zzd/> EŽ ĞƉƚŚ /ƚĞŵ ϭ ϭϯϳ͛ ^ƚĂ͘Ϯ'>D͗ĂŵĐŽϮͲϳͬϴ͟yϭΖΖ^ŝĚĞƉŽĐŬĞƚ͕ǁͬ'>s Ϯ ϭϰ͕ϬϬϳ͛ ^ƚĂ͘ϭ'>D͗ ĂŵĐŽϮͲϳͬϴ͟yϭΖΖ^ŝĚĞƉŽĐŬĞƚ͕KƉĞŶWŽĐŬĞƚ ϯ ϭϰ͕ϭϭϳ͛ ϮͲϳͬϴ͟yEͲEŝƉƉůĞʹϮ͘ϮϬϱ͟EŽ'Ž ϰ ϭϰ͕ϭϱϵ͛ ŝƐĐŚĂƌŐĞ,ĞĂĚ͗'W/^ ϱ ϭϰ͕ϭϲϬ͛ WƵŵƉ͗ϭϭϵWϮϯ͕WD^y ϲ ϭϰ͕ϭϳϳ͛ WƵŵƉ͗ϭϴWϳϱ͕WD^y ϳ ϭϰ͕ϭϴϰ͛ 'ĂƐ^ĞƉĂƌĂƚŽƌ͗'^d,ssy,ϲ ϴ ϭϰ͕ϭϴϵ͛ hƉƉĞƌdĂŶĚĞŵ^ĞĂů͗'^ϯhd^ͬ^W&^ ϵ ϭϰ͕ϭϵϲ͛ >ŽǁĞƌdĂŶĚĞŵ^ĞĂů͗'^ϯhd^ͬ^W&^ ϭϬ ϭϰ͕ϮϬϯ͛ DŽƚŽƌ͗>ϱ͕yW͕ϮϱϬ,ƉͬϮ͕ϱϬϱsͬϲϭ ϭϭ ϭϰ͕ϮϮϬ͛ tĞůů>ŝĨƚ^ĞŶƐŽƌǁͬĞŶƚƌĂůŝnjĞƌʹ ŽƚƚŽŵΛϭϰ͕ϮϮϰ͛ WZ&KZd/KEd/> <ƵƉĂƌƵŬ^ĂŶĚƐ dŽƉ;DͿ ƚŵ;DͿ dŽƉ;dsͿ ƚŵ;dsͿ &d ĂƚĞ ^ƚĂƚƵ Ɛ ϯͬϮ^ĂŶĚƐ ϭϰ͕ϰϯϰ͛ ϭϰ͕ϰϳϬ͛ ϳ͕ϭϳϴ͛ ϳ͕ϮϬϰ͛ ϯϲ͛ ϲͬϮϬͬϭϵϵϲ KƉĞŶ ϭͬ^ĂŶĚ ϭϰ͕ϰϴϮ͛ ϭϰ͕ϱϮϮ͛ ϳ͕ϮϭϮ͛ ϳ͕ϮϰϬ͛ ϰϬ͛ ϲͬϭϵͬϭϵϵϲ KƉĞŶ t>>/E>/Ed/KE d/> <KWΛϲϬϬ͛ DĂdž,ŽůĞŶŐůĞсϲϳƚŽϳϭĚĞŐ͘Ĩͬϯ͕ϳϬϬ͛ƚŽϭϯ͕ϯϬϬ͛ ,ŽůĞŶŐůĞƚŚƌƵƉĞƌĨƐсϰϱĞŐ͘EŽ>^сϯĞŐͬ͘ϭϬϬ͛ dZΘt>>, dƌĞĞ ϮͲϵͬϭϲ͟ϱD&D tĞůůŚĞĂĚ ϭϭ͟ϱD&D dƵďŝŶŐ,ĂŶŐĞƌ ϮͲϳͬϴ͟t<Dǁͬϯ͟>,ĐŵĞdŚƌĞĂĚƐ͕Ϯ͘ϱ͟/t,WsWƌŽĨŝůĞ 'EZ>t>>/E&K W/͗ϱϬͲϬϮϵͲϮϮϲϴϭͲϬϬͲϬϬ ƌŝůůĞĚĂŶĚĂƐĞĚďLJEĂďŽƌƐϮϮͲϲͬϭϲͬϭϵϵϲ WĞƌĨŽƌĂƚĞĚʹϲͬϮϬͬϭϵϵϲ ^WŽŵƉůĞƚŝŽŶďLJWŽůĂƌϭʹϳͬϭϲͬϭϵϵϲ ^WZtKďLJEĂďŽƌƐϰ^ʹϳͬϴͬϮϬϬϭ ^WZtKďLJŽLJŽŶϭϰʹϲͬϱͬϮϬϬϰ ^WZtKďLJEĂďŽƌƐϯ^ʹϳͬϭϳͬϮϬϬϴ ^WZtKďLJŽLJŽŶϭϲʹϲͬϭϱͬϮϬϭϮ ^WZtKďLJEŽƌĚŝĐϯʹϰͬϭϯͬϮϬϭϱ ^WZtKďLJ^ZηϭʹϯͬϱͬϮϬϭϴ KWE,K>ͬDEdd/> ϮϬ͟ ϮϱϬƐdžƌĐƚŝĐƐĞƚ/;ƉƉƌŽdž͘ͿŝŶĂϮϰ͟,ŽůĞ ϵͲϱͬϴ͟ ϭ͕ϲϬϬƐdžW&͚͕͛ϲϬϬƐdž͚'͕͛ϭϱϬƐdžW&͚͛ŝŶĂϭϮ͘Ϯϱ͟,ŽůĞ ϳ͟ ϮϮϬƐdžůĂƐƐ͞'͟ŝŶĂϴ͘ϱ͟,ŽůĞ ^d/Dh>d/KEd/> /ŶƚĞƌǀĂů͗ϭϰ͕ϰϯϰ͛ƚŽϭϰ͕ϰϳϬ͛Θϭϰ͕ϰϴϮ͛ƚŽϭϰ͕ϱϮϮ͛͘&ƌĂĐ͛Ěǁͬ ϭϱϰ͕ϭϬϬůďƐ͘ŽĨϭϲͲϮϬĂƌďŽůŝƚĞďĞŚŝŶĚƉŝƉĞ͘ ^W>^W>/d/> ^WĂďůĞ^ƉůŝĐĞĚĂƚϭ͕ϲϰϬ͛ĂŶĚϲ͕ϭϮϵ͛͘ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB ZĞǀŝƐĞĚLJ͗d&ϭϮͬϮϮͬϮϬϮϬ WZKWK^ DŝůŶĞWŽŝŶƚhŶŝƚ tĞůů͗DWh&Ͳϭϴ >ĂƐƚŽŵƉůĞƚĞĚ͗ϯͬϱͬϮϬϭϱ Wd͗ϭϵϲͲϭϬϬ dсϭϰ͕ϵϰϭ͛ ;DͿͬdсϳ͕ϱϯϬ͛;dsͿ ϮϬ´ ´6KRUWMRLQWI ¶WR¶ 5$7DJ#¶ KƌŝŐ͘<ůĞǀ͗͘Ϯϴ͘Ϯϱ͛ͬ'>ůĞǀ͗͘ϭϮ͘ϰϬ͛;EϮϮͿ ϳ͟   ϵͲϱͬϴ ͟   Wdсϭϰ͕ϴϯϰ͛;DͿͬWdсϳ͕ϰϱϲ͛;dsͿ  )LVK&HQWUDOL]HU SXVKHGWR¶.836DQGV ^/E'd/> ^ŝnjĞ dLJƉĞ tƚͬ'ƌĂĚĞͬŽŶŶ / dŽƉ ƚŵ ϮϬΗ ŽŶĚƵĐƚŽƌ ϵϭ͘ϭͬ,ͲϰϬͬEͬ Eͬ ^ƵƌĨĂĐĞ ϭϭϮΖ ϵͲϱͬϴΗ ^ƵƌĨĂĐĞ ϰϬͬ>ͲϴϬͬƚƌĐ͘ ϴ͘ϴϯϱ ^ƵƌĨĂĐĞ ϳ͕ϵϭϰ͛ ϳΗ WƌŽĚƵĐƚŝŽŶ Ϯϲͬ>ͲϴϬͬƚƌĐ ϲ͘Ϯϳϲ ^ƵƌĨĂĐĞ ϭϰ͕ϵϭϱ͛ dh/E'd/> ϰͲϭͬϮ͟ dƵďŝŶŐ ϭϮ͘ϲͬ>ͲϴϬͬdyW ϯ͘ϵϱϴ ^ƵƌĨĂĐĞ цϭϰ͕ϯϮϰ͛ :t>Zzd/> EŽ ĞƉƚŚ /ƚĞŵ ϭ цϮ͕ϯϬϬ͛ yͲEŝƉƉůĞʹϯ͘ϴϭϯ/ Ϯ цϭϰ͕ϮϯϮ͛ WĂĐŬĞƌ ϯ цϭϰ͕ϮϲϮ͛ yͲEŝƉƉůĞʹϯ͘ϴϭϯ/ ϰ цϭϰ͕ϯϮϬ͛ DĂŐŶƵŵƵƌƐƚŝƐŬϰ͕ϱϬϬƉƐŝ ϱ цϭϰ͕ϯϮϮ͛ t>'ʹŽƚƚŽŵĂƚцϭϰ͕ϯϮϰ͛ WZ&KZd/KEd/> <ƵƉĂƌƵŬ^ĂŶĚƐ dŽƉ;DͿ ƚŵ;DͿ dŽƉ;dsͿ ƚŵ;dsͿ &d ĂƚĞ ^ƚĂƚƵ Ɛ ϯͬϮ^ĂŶĚƐ ϭϰ͕ϰϯϰ͛ ϭϰ͕ϰϳϬ͛ ϳ͕ϭϳϴ͛ ϳ͕ϮϬϰ͛ ϯϲ͛ ϲͬϮϬͬϭϵϵϲ KƉĞŶ ϭͬ^ĂŶĚ ϭϰ͕ϰϴϮ͛ ϭϰ͕ϱϮϮ͛ ϳ͕ϮϭϮ͛ ϳ͕ϮϰϬ͛ ϰϬ͛ ϲͬϭϵͬϭϵϵϲ KƉĞŶ t>>/E>/Ed/KEd/> <KWΛϲϬϬ͛ DĂdž,ŽůĞŶŐůĞсϲϳƚŽϳϭĚĞŐ͘Ĩͬϯ͕ϳϬϬ͛ƚŽϭϯ͕ϯϬϬ͛ ,ŽůĞŶŐůĞƚŚƌƵƉĞƌĨƐсϰϱĞŐ͘EŽ>^сϯĞŐͬ͘ϭϬϬ͛ dZΘt>>, dƌĞĞ ϮͲϵͬϭϲ͟ϱD&D tĞůůŚĞĂĚ ϭϭ͟ϱD&D dƵďŝŶŐ,ĂŶŐĞƌ ϮͲϳͬϴ͟t<Dǁͬϯ͟>,ĐŵĞdŚƌĞĂĚƐ͕Ϯ͘ϱ͟/t,WsWƌŽĨŝůĞ 'EZ>t>>/E&K W/͗ϱϬͲϬϮϵͲϮϮϲϴϭͲϬϬͲϬϬ ƌŝůůĞĚĂŶĚĂƐĞĚďLJEĂďŽƌƐϮϮͲϲͬϭϲͬϭϵϵϲ WĞƌĨŽƌĂƚĞĚʹϲͬϮϬͬϭϵϵϲ ^WŽŵƉůĞƚŝŽŶďLJWŽůĂƌϭʹϳͬϭϲͬϭϵϵϲ ^WZtKďLJEĂďŽƌƐϰ^ʹϳͬϴͬϮϬϬϭ ^WZtKďLJŽLJŽŶϭϰʹϲͬϱͬϮϬϬϰ ^WZtKďLJEĂďŽƌƐϯ^ʹϳͬϭϳͬϮϬϬϴ ^WZtKďLJŽLJŽŶϭϲʹϲͬϭϱͬϮϬϭϮ ^WZtKďLJEŽƌĚŝĐϯʹϰͬϭϯͬϮϬϭϱ ^WZtKďLJ^ZηϭʹϯͬϱͬϮϬϭϴ KWE,K>ͬDEdd/> ϮϬ͟ ϮϱϬƐdžƌĐƚŝĐƐĞƚ/;ƉƉƌŽdž͘ͿŝŶĂϮϰ͟,ŽůĞ ϵͲϱͬϴ͟ ϭ͕ϲϬϬƐdžW&͚͕͛ϲϬϬƐdž͚'͕͛ϭϱϬƐdžW&͚͛ŝŶĂϭϮ͘Ϯϱ͟,ŽůĞ ϳ͟ ϮϮϬƐdžůĂƐƐ͞'͟ŝŶĂϴ͘ϱ͟,ŽůĞ ^d/Dh>d/KEd/> /ŶƚĞƌǀĂů͗ϭϰ͕ϰϯϰ͛ƚŽϭϰ͕ϰϳϬ͛Θϭϰ͕ϰϴϮ͛ƚŽϭϰ͕ϱϮϮ͛͘&ƌĂĐ͛Ěǁͬ ϭϱϰ͕ϭϬϬůďƐ͘ŽĨϭϲͲϮϬĂƌďŽůŝƚĞďĞŚŝŶĚƉŝƉĞ͘ &ƌĂĐ͛Ěǁ DŝůŶĞWŽŝŶƚ ^ZZŝŐϭKW %23( Εϰ͘ϰϴΖ Εϰ͘ϱϰΖ Ϯ͘ϬϬΖ ϱϬϬϬη ϮͲϳͬϴΗdžϱΗsZ  ϱϬϬϬη ůŝŶĚ ^͕ϭϭϱDyϳϭͬϭϲϱD;/ĨEĞĞĚĞĚͿ ϮϭͬϭϲϱD<ŝůů>ŝŶĞsĂůǀĞƐ ϮϭͬϭϲϱDŚŽŬĞ>ŝŶĞsĂůǀĞƐ ,ZDĂŶƵĂůDĂŶƵĂůDĂŶƵĂů ^ƚƌŝƉƉŝŶŐ,ĞĂĚ +LOFRUS$ODVND//&+LOFRUS$ODVND//&Changes to Approved Rig Work Over Sundry Procedure'DWH -DQXDU\WK6XEMHFW &KDQJHVWR$SSURYHG6XQGU\3URFHGXUHIRU:HOO03)6XQGU\;;;;;;$Q\PRGLILFDWLRQVWRDQDSSURYHGVXQGU\ZLOOEHGRFXPHQWHGDQGDSSURYHGEHORZ&KDQJHVWRDQDSSURYHGVXQGU\ZLOOEHFRPPXQLFDWHGWRWKH$2*&&E\WKHULJZRUNRYHU 5:2 ³ILUVWFDOO´HQJLQHHU$2*&&ZULWWHQDSSURYDORIWKHFKDQJHLVUHTXLUHGEHIRUHLPSOHPHQWLQJWKHFKDQJH6WHS 3DJH 'DWH 3URFHGXUH&KDQJH+$.3UHSDUHG%\ ,QLWLDOV +$.$SSURYHG%\ ,QLWLDOV $2*&&:ULWWHQ$SSURYDO5HFHLYHG 3HUVRQDQG'DWH $SSURYDO2SHUDWLRQV0DQDJHU 'DWH3UHSDUHG2SHUDWLRQV(QJLQHHU 'DWH Samuel Gebert Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 Fax: 907 777-8510 E-mail: sam.gebert@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: DATE: 12/04/2020 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU F-18 (PTD 196-100) Multi Finger Caliper Log 08/12/2020 Please include current contact information if different from above. Received by the AOGCC 12/04/2020 PTD: 1961000 E-Set: 34359 Abby Bell 12/09/2020 RECEIVED • STATE OF ALASKA ALA OIL AND GAS CONSERVATION COMMI ION o REPORT OF SUNDRY WELL OPERATIONS APR 2018 1.Operations Abandon LI Plug Perforations U Fracture StimulateU Pull Tubing U Ia "° Gown U Performed: Suspend ❑ Perforate ❑ Other Stimulate❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ arforate New Pool ❑ Repair Well Re-enter Susp Well ❑ Other: ESP Change-out 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: Hilcorp Alaska LLC Development Q Exploratory ❑ 196-100 3.Address: 3800 Centerpoint Dr,Suite 1400 Anchorage, Stratigraphic❑ Service ❑ 6.API Number: AK 99503 50-029-22681-00-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0355018 MILNE PT UNIT F-18 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): N/A MILNE POINT FIELD/KUPARUK RIVER OIL POOL 11.Present Well Condition Summary: Total Depth measured 14,941 feet Plugs measured N/A feet true vertical 7,530 feet Junk measured 14,522 feet Effective Depth measured 14,834 feet Packer measured N/A feet true vertical 7,456 feet true vertical N/A feet Casing Length Size MD TVD Burst Collapse Conductor 80' 20" 112' 112' N/A N/A Surface 7,883' 9-5/8" 7,914' 4,529' 5,750psi 3,090psi Production 14,886' 7" 14,915' 7,512' 7,240psi 5,410psi Perforation depth Measured depth See Schematic feet True Vertical depth See Schematic feet Tubing(size,grade,measured and true vertical depth) 2-7/8" 6.5/L-80/EUE 8rd 14,224' 7,031' Packers and SSSV(type,measured and true vertical depth) N/A N/A N/A N/A 12.Stimulation or cement squeeze summary: N/A Intervals treated(measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 400 0 Subsequent to operation: 187 57 1,649 240 224 14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ❑� Exploratory Development Q Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil ❑✓ Gas ❑ WDSPL❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 318-063 Authorized Name: Bo York Contact Name: Paul Chan Authorized Title: Operations Manager Contact Email: pchan@hilcorp.Com Authorized Signature: Date: 3/23/2018 Contact Phone: 777-8333 g to-ice RBDMS/ APR 0 6 2018 Form 10-404 Revised 4/2017 Submit Original Only 1 Eli • • Milne Point Unit Well: MPU F-18 SCHEMATIC Last Completed: 3/5/2015 Hilcorp Alaska,LLC PTD: 196-100 Orig.KB Elev.:28.25'/GL Elev.:12.40'(N 22E) TREE&WELLHEAD Tree 2-9/16"5M FMC 6 SWellhead 11" 5M FMC 20' 0.III 4, k c Tubing Hanger 2-7/8"WKM w/3"LH Acme Threads,2.5"CIW H BPV Profile i OPEN HOLE/CEMENT DETAIL 1 20" 250 sx Arcticset I(Approx.)in a 24"Hole 9-5/8" 1,600 sx PF'E',600 sx`G',150 sx PF'E'in a 12.25"Hole 7" 220 sx Class"G"in a 8.5"Hole CASING DETAIL s Size Type Wt/Grade/Conn ID Top Btm 20" Conductor 91.1/H-40/N/A N/A Surface 112' ,.. 9-5/8" _ Surface 40/L-80/Btrc. 8.835 Surface 7,914' ' 1. F7" Production 26/L-80/Btrc 6.276 Surface 14,915' r ( ' TUBING DETAIL i 2-7/8" Tubing 6.5/L-80/EUE 8rd 2.441 Surface 14,224' tiqµ k 3/8" Capstring Stainless Steel N/A Surface 14,224' JEWELRY DETAIL .. No Depth Item 9-5/8 1 137' Sta.2 GLM:Camco 2-7/8"X 1"Side pocket,w/Orifice 2 14,007' Sta.1 GLM: Camco 2-7/8"X 1"Side pocket,w/Dummy 3 14,117' 2-7/8"XN-Nipple-2.205"No Go 3/8"SSCapstring 4 14,159' Discharge Head:GPDIS 1 5 14,160' Pump:119P23,PMSXD 6 14,177' Pump:18P75,PMSXD 7 14,184' Gas Separator:GSTHVEVX H6 8 14,189' Upper Tandem Seal:GSB3DBUT SB/SB PFSA 9 14,196' Lower Tandem Seal:GSB3DBUT SB/SB PFSA 10 14,203' Motor:CL5,XP,250Hp/2,505V/61A ri ; u .5 11 14,220' WeIlLift E Sensor w/Centralizer-Bottom @ 14,224' WELL INCLINATION DETAIL 2 it KOP @ 600' 'I Max Hole Angle=67 to 71 deg. f/3,700'to 13,300' Hole Angle thru perfs=45 Deg.No DLS=3 Deg./100' MIN ID=2.205" r Al @14,117' ;A-iil PERFORATION DETAIL 7 snatjan<fi 3 Kuparuk Sands Top(MD) Btm(MD) Top(TVD) Btm(TVD) FT Date Status 14,196'to 14,236'. M 4 p RA Tag@14,196 A3/A2 Sands 14,434' 14,470' 7,178' 7,204' 36' 6/20/1996 Open N..........i4 i? A1/ Sand 14,482' 14,522' 7,212' 7,240' 40' 6/19/1996 Open r5 , , STIMULATION DETAIL Interval:14,434'to 14,470'&14,482'to 14,522'. Frac'd w/ 7 154,1001bs.of 16-20 Carbolite behind pipe. a g kt' ESP CABLE SPLICE DETAIL k y; ESP Cable Spliced at 1,640'and 6,129'. 9 GENERAL WELL INFO Itt �s "10 1 API:50-029-22681-00-00 " °; Drilled and Cased by Nabors 22E -6/16/1996 , 11 Perforated-6/20/1996 Fish-Cd to 1 ,52 ESP Completion by Polar 1-7/16/1996 zer to pushed to 14,522 a ESP RWO by Nabors 4ES-7/8/2001 KUP Sands ESP RWO by Doyon 14-6/5/2004 9? k) ESP RWO by Nabors 35-7/17/2008 4 ESP RWO by Doyon 16-6/15/2012 ESP RWO by Nordic 3-4/13/2015 TD=14,941'(MD)/TD=7,530'(TVD) ESP RWO by ASR#1-3/5/2018 PBTD=14,834'(MD)/PBTD=7,456'(TVD) Revised By:TDF 3/8/2018 • Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date _ End Date MP F-18 ASR#1 50-029-22681-00-00 196-100 2/23/18 3/4/18 Daily Operations: 2/21/2017-Wednesday No activity to report. 2/22/2017-Thursday No activity to report. 2/23/2017- Friday No activity to report. 2/24/2017-Saturday No activity to report. 2/25/2017-Sunday No activity to report. 2/26/2017- Monday R/u, run lines &winterize rig, install drip pan, bails, elevators&finish dress out floor Pull BPV, install TWC, rig up &fill surface eq. shell test 2,500 good Test BOPE as per Hilcorp &AGOCC requirements, AOGCC witness was waived by inspector Jeff Jones on 2-24-18,tested 250/2,500 psi w/2 7/8"TJ, had one F/P on Annular,tested gas alarms good Blow down all lines and prep to pull TWC. Wellhead reps on location.Verify no pressure is on the IA. P/U T-bar and back out TWC. Perform fluid checks, rig tong adjustments needed on the make up/breakout switch. P/U landing joint and attempt to drift. Landing joint iced up. L/D landing joint and P/U new joint, M/U TIW and LH Acme retrieving sub. 5' mark landing joint to TBG hanger (16.8'), M/U landing joint to TBG hanger(9.5 turns), BOLDS. Unseat TBG hanger @ 65klbs, ESP completion moving w/ 100kIbs P/U weight.Tool carrier/rack and pinion system functioning smooth. Pull TBG hanger to the floor. Cut ESP cable, set completion in slips and B/O landing jnt/TBG hanger/pup below hanger. Attach cable pulling clamps to ESP cable and string rope from floor,through sheave, back into ESP spooling unit. R/U pump in sub to TBG stump and pump down TBG to verify fluid depth. Catch pressure after 20bbls away(fluid level @ 3,455'md). Blow down lines and prepare to continue OOH w/ ESP completion. POOH w/ESP completion on 2-7/8" EUE TBG f/ 14,230'md Issue getting catwalk controls to function properly. Contact Prostar and have them come out to location and assess the issue. Work through catwalk joystick functions until controls begin to function again. Fill annulus w/25bbls of water from rig pits and continue to POOH to 9,631'md. 2/27/2017-Tuesday Cont. POOH I/d completion f/9,631'0/6,,909' Shut down, pulled carriage caps inspect bearings good,walk through rig tong maint& Namco box level questions with Prostar tech. Cont. POOH I/d completion f/6,909',t/985'Tool pusher generator shut down, operations, had hands perform full bare pipe shut in drill,good performance Perform rig service & housekeeping while VMS mechanic trouble shoot generator. Back up generator on location...from NC equipment. VMS able to get primary generator up and running. Open up well and attempt to pump. Unable to catch pressure. Troubleshoot.Jumper line from rig pits to carrier frozen. Break off line and remove ice plug. Rig jumper line back up and pump 25bbls down the IA. Continue to POOH w/ESP completion on 2-7/8" EUE pipe to the discharge head. Pipe scaled on the last joint above the pump. L/D ESP completion. MLE cable was found to be damaged,stripping—2 of cable armor off of the MLE cable. M/U new ESP completion and prepare to RIH. Discussions w/Centrilift about MLE condition. Contact Ops Engineer and discuss options moving forward. 411, 4110 Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date MP F-18 ASR#1 50-029-22681-00-00 196-100 2/23/18 3/4/18 Daily Operations: 2/28/2018-Wednesday Discuss options of making a cleanout run with engineering, decision made to make c/o run. L/d motor& lower tandem seal assy, change out handling eq. on floor& layout cable &cap line from sheaves. Prep & make up c/o assy. =6" bit, 7" casing scraper, 2-4-3/4" boot baskets, bit sub, xo = 13.62',TIH p/u 2-7/8 " string t/5,196' Continue to RIH w/Weatherford cleanout BHA on 2-7/8" EUE TBG f/5,196'md to —13,000'md. Perform kick while tripping drill and perform AAR.Shut in time and location secure 51 seconds. 3/1/2018-Thursday Service rig Cont. TIH w/c/o assy t/14,206' up wt 64k, do wt 24k, R/U &wash down t/ 14,272' @ 3.6BPM, 860psi cont. circulate 30 bbls while recip. Blow down all surface lines, prep f/scale inhibitor job. while waiting on fluid & LRS R/U LRS t/ pump scale inhibitor, PT lines t/2,500psi good Pump 26 bbls WAW5206 pre-flush mix,follow with 84 bbls SCW4004 inhibitor mix @ 2bpm, 650psi, chase with 170 bbls with rig pump @ 3BPM 1,440psi FCP Shut down, blow down &Start POOH w/2 7/8 tubing&c/o assy. Continue to POOH w/Weatherford cleanout assembly on 2-7/8" EUE completion pipe f/ 12,500'md t/ 2000'md. Perform rig evacuation drill simulating High LEL alarms in the pits w/AAR. 3/2/2018-Friday Service Rig Cont/POOH I/d 2-7/8"tubing, 1/d BHA recover 1.5 gal scale w/hand full of metal pieces ( appears to be cable armor) Clear&clean floor, stock with ESP handling tools P/U &Service ESP assy.test cable & cap line Good TIH w/ESP Assy. testing cable every 2,000' &cap line every 2,000'T/5,500'md. Perform high H2S drill w/AAR. Continue to RIH w/ESP completion on 2-7/8" TBG f/5,500'md to 7,500'md. 3/3/2018-Saturday At 7,841' change out cable reel & make splice, test same good, (splice landed on jt 253) Cont. RIH w/ESP completion p/u 2- 7/8" EUE L-80 6.51b 8rd tubing testing cable every 2000' Rig Up fill tubing& break circulation, 1.5 BPM,450psi, clear Cont. RIH w/ESP completion p/u 2-7/8" EUE L-80 6.5lb 8rd tubing testing cable every 2,000', break circulation before p/u last GLM, @ 14,069' good, cont. RIH t/ 14190' P/U hanger& landing jt, Make penetrator splice &terminate cap lines to hanger. Complete penetrator splice. 5'TBG hanger into TBG bowl until on seat. RILDS, set BPV. Assy.tail @ 14,223', SIMOPS: Blow down fluid lines and prep to move to F-87. Cont. R/D off F-18. 3/4/2018-Sunday Cont. R/d from F-18, Move off& remove floor, N/D BOPE, N/U tree &test void t/5,000psi good. 3/5/2018- Monday No activity to report. 3/6/2018-Tuesday No activity to report. THE STATE OfALASKA GOVERNOR BILL WALKER Bo York Operations Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK, 99503 Re: Milne Point Field, Kuparuk River Oil Pool, MPU F-18 Permit to Drill Number: 196-100 Sundry Number: 318-063 Dear Mr. York: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax 907.276.7542 www.00gcc.claska.gov Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Si DATED this 21 day of February, 2018. Sincerely, Hollis S. French Chair RED@".S LL—F71 i 6 2018 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 'ECEIVED FEB 15 at nes°'24 /�I+- I AOGC 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑� Operations shutdown El Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing Q Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ESP Change -out ❑✓' 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Hilcorp Alaska LLC - Exploratory ❑ Development Q Stratigraphic ❑ Service ❑ 196-100 , 3. Address: 3800 Centerpoint Dr, Suite 1400 6. API Number: Anchorage Alaska 99503 50-029-22681-00-00, 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? C.O. 432D Will planned perforations require a spacing exception? Yes ❑ No ❑± ,/ MILNE PT UNIT F-18 9. Property Designation (Lease Number): 10. Field/Pool(s). ADL0355018 MILNE POINT FIELD/ KUPARUK RIVER OIL POOL ` 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (it): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): ' 14,941' 7,530' 14,834' 7,456' 1,308 N/A 14,522' Casing Length Size MD TVD Burst Collapse Conductor 80, 20" 112' 112' N/A N/A Surface 7,883' 9-5/8" 7,914' 4,529' 5,750psi 3,090psi Production 14,886' 7" 14,915' 7,512' 7,240psi 5,410psi Perforation Depth MD (it): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (h): See Schematic See Schematic 2-7/8" 6.5#/ L-84 EUE 8rd 14,234' Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): N/A N/A 12. Attachments: Proposal Summary Wellbore schematic j 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Straligraphic ❑ Development ❑� • Service ❑ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 2/28/2018 OIL WINJ ❑ WDSPL ❑ Suspended ❑ GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: So York Contact Name: Paul Chan Authorized Title: Operations Manager Contact Email: Chan hilcor .com r^7 Contact Phone: 777-8333 Authorized Signatu G� 'M L)� OI Date: 2/14/2018 COMMISSION USE ONLY Conditions of approv otify Commission so that a representative may witness Sundry Number: Plug Integrity ❑ BOP Test Integrity Test ❑ Location Clearance ❑ AMechanical Other: t Post Initial Injection MIT Req'd? Yes ❑ No ❑ /,/, Spacing Exception Required? Yes 1 (� � oll E] No Subsequent Form Required: ` APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: ^ r� `r Form 10-403 Revised 4/2017 ORIGIN L 7Z�-��- JB Submit Form and Approved application is valid for 72 months rom the date of approval. ttch irvp li RRnli t,vna `17`to U liilw.v Alaska, LU Well Prognosis Well: MPU F-18 Date:2/13/2018 Well Name: MPU F-18 API Number: 50-029-22681-00 Current Status: Oil Well Pad: F -Pad Estimated Start Date: February 28th, 2018 Rig: ASR 1 Reg. Approval Req'd? Yes Date Reg. Approval Rec'vd: Regulatory Contact: Tom Fouts Permit to Drill Number: 196-100 First Call Engineer: Paul Chan (907) 777-8333 (0) (907) 444-2881 (M) Second Call Engineer: Taylor Wellman (907) 777-8449 (0) (907) 947-9533 (M) AFE Number: Job Type: ESP Repair Current Bottom Hole Pressure: 2,008 psi @ 7,000' TVDss SBHPS 02/08/2018 / 5.58 ppg EMW) Maximum Expected BHP: 2,008 psi @ 7,000' TVDss (No new perfs being added) / MPSP: 1,308 psi (0.1 psi/ft gas gradient) Brief Well Summary: MPU F-18 was drilled and fracture stimulated in June 1996, and completed as a Kuparuk River producer in July 1996. ESP installation history: July 1996 (initial), July 2001, June 2004, July 2008, June 2012, and April 2015. The ESP has failed. Notes Regarding Wellbore Condition • The 7" production casing was tested down to 13,400' MD / 3,500 psi on June 13, 2012. 'L6r7"L— • CO 390A: Hilcorp Alaska respectfully requests that a packer not be required on this ESP completion as the reservoir pressure is less than 8.55 ppg EMW. D V-- Obiective• Replace failed ESP. Pre -Rig Procedure: 1. Clear and level pad area in front of well. Spot rig mats and containment. 2. RD well house and flowlines. Clear and level area around well. 3. RU Little Red Services. RU reverse out skid and 500 bbl returns tank. 4. Pressure test lines to 3,000 psi. 5. Circulate at least one wellbore volume with 8.5 ppg sea water down tubing, taking returns up casing to 500 bbl returns tank. 6. Confirm well is dead. Freeze protect tubing/casing as needed with 60/40 McOH or diesel. 7. RD Little Red Services and reverse out skid. 8. RU crane. Set BPV. ND Tree. NU BOPE. RD Crane. 9. NU BOPE house. Spot mud boat. U Ilil'.rp Al.skn, LL Brief RWO Procedure: Well Prognosis Well: MPU F-18 Date: 2/13/2018 10. MIRU Hilcorp ASR #1 WO Rig, ancillary equipment and lines to 500 bbl returns tank. 11. Check for pressure and if 0 psi pull BPV. If needed, bleed off any residual pressure off tubing and casing. If needed, kill well w/ 8.5 ppg sea water prior to pulling BPV. Set TWC. 12. Test BOPE to 250 annular to 250 ram/valve and test for 5 -min). Record accumulator pre -charge pressures a a. Perform Test per ASR 1 BOP Test Procedure dated 11/03/2015. b. Notify AOGCC 24 hours in advance of BOP test. c. Confirm test pressures per the Sundry Conditions of approval. d. Test VBR ram on 2-7/8" test joint. e. Submit to AOGCC completed 10-424 form within 5 days of BOPE test. old each tests. 13. Contingency: (If the tubing hanger won't pressure test due to either a penetrator leak or the BPV profile is eroded and/or corroded and BPV cannot be set with tree on.) a. Notify Operations Engineer (Hilcorp), Mr. Guy Schwartz (AOGCC) and Mr. Jim Regg (AOGCC) via email explaining the wellhead situation prior to performing the rolling test. AOGCC may elect to send an inspector to witness test. �4 b. With stack out of the test path, test choke manifold per standard procedure 1 c. Conduct a rolling test: Test the rams and annular with the pump continuing to pump, (monitor '\ the surface equipment for leaks to ensure that the fluid is going down -hole and not leaking anywhere at surface.) d. Hold a constant pressure on the equipment and monitor the fluid/pump rate into the well. Record the pumping rate and pressure. e. Once the BOP ram and annular tests are completed, test the remainder of the system following the normal test procedure (floor valves, gas detection, etc.) f. Record and report this test with notes in the remarks column that the tubing hanger/BPV profile / penetrator wouldn't hold pressure and rolling test was performed on BOP Equipment and list items, pressures and rates. 14. Bleed any pressure off casing to 500 bbl returns tank. Pull TWC. Kill well w/ 8.5 ppg sea water as needed. 15. MU landing joint or spear and PU on the tubing hanger. a. The PU weight during the 2015 ESP swap was 125K lbs. (Block weight not noted) b. If needed, circulate (long or reverse) pill with lubricant prior to laying down the tubing hanger. 16. Recover the tubing hanger. Contingency (If a rolling test was conducted): MU new hanger or test plug to the completion tubing. Re -land hanger (or test plug) in tubing head. Test BOPE per standard procedure. 17. POOH and laydown th. / tubing. Number all joints. Tubing will be re -used as noted. Lay down ESP. a. Replace bad joints of tubing as necessary and note on tally new tubing run. b. Note any sand or scale inside or on the outside of the ESP on the morning report. c. Look for over -torqued connections from previous tubing runs. 18. PU new ESP/cap string and RIH on 2-7/8" tubing. Set base of ESP assembly at± 14,234' MD. H Ililareo Alaska, LL a. Upper GLM @ ± 140' MD w/SO b. 2-7/8" tubing c. Lower GLM w/ DGLV d. 3 joints of 2-7/8" tubing e. 2-7/8" XN (2.205" No -Go) f. 1 joint of 2-7/8" tubing g. Base of ESP centralizer @ ± 14,234' MD Well Prognosis Well: MPU F-18 Date: 2/13/2018 19. Land tubing hanger. RILDS. Lay down landing joint. Note PU (Pick Up) and SO (Slack Off) weights on tally. 20. Set BPV. Post -Rig Procedure: 21. RD mud boat. RD ROPE house. Move to next well location. 22. RU crane. ND BOPE. 23. NU existing 2-9/16" 5,000# tree/adapter flange. Test tubing hanger void to 500 psi low/5,000 psi high. Pull BPV. 24. RD crane. Move 500 bbl returns tank and rig mats to next well location. 25. Replace gauge(s) if removed. 26. Turn well over to production. RU well house and flowlines. Attachments: 1. As -built Schematic 2. Proposed Schematic 3. BOPE Schematic 4. Existing Tree/Wellhead S. Blank RWO MOC Form nf Orig. KB Elev.: 28.25/ GL Elev.: 12AU IN 22E) TD=14,941' (MD) / TD = 7,53(Y(T7D) PBTD=14,834' (MD) / PBTD = 7,456(TVD) SCHEMATIC CASING DETAIL Milne Point Unit Well: MPU F-18 Last Completed: 4/13/2015 PTD: 196-100 Size Type Wt/Grade/Conn ID Top Btm 20" Conductor 91.1 / H-40 / N/A N/A Surface 112' 9-5/8" Surface 40/L-80/Btrc. 8.835 Surface 7,914' 7" Production 26/L-80/Btrc 6.276 Surface 14,915' TUBING DETAIL 2-7/8" Tubing 6.5 / L-80 / EUE 8rd 2.441 Surface 14,234' 3/8" Capstring Stainless Steel N/A Surface 14,234' JEWELRY DETAIL No Depth Item 1 170' GLM: 2 14,012' GLM: 3 14,155' 2-7/8" XN-Nipple 4 14,166' Discharge Head: GPDIS 5 14,166.5' Pump: 119P23/PMSXD 6 14,184' Pump: 18P75/PMSXD 7 14,191' Gas Separator: GSTHVVXH6 814,196' Upper Tandem Seal: G5B3DBUT5B/SB PFSA 9 14,203' Lower Tandem Seal: GS83DOUTSB/SS PFSA 10 14,210' Motor: CLS / MSP3-250 / 252hp/ 2,275V / 67A 11 14,230' PumpMate & Centralizer- Bottom @ 14,234' PERFORATION DETAIL Kuparuk Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status A3/A2 Sands 14,434' 14,470' 1 7,178' 7,204' 1 36' 6/20/1996 Open A3/Sand 14,482' 14,522' 1 7,212' 7,240' 1 40' 6/19/1996 Open OPEN HOLE/ CEMENT DETAIL 20" 250 sx Arcticset I(Approx.) in a 24" Hole 9-5/8" 1,600 sx PF 'E', 600 sx V, 150 sx PF'E' in a 12.25" Hole 7" 220 sx Class "G" in a 8.5" Hole WELL INCLINATION DETAIL KOP @ 600' Max Hole Angle = 67 to 71 deg. f/ 3,700'to 13,300' Hole Angle thru perfs = 45 Deg. No DLS = 3 Deg. / 100' TREE & WELLHEAD Tree 2-9/16"SM FMC Wellhead 11" SM FMC Tubing Hanger 2-7/8"WKM w/ 3" LH Acme Threads, 2.5" CIW H BPV Profile STIMULATION DETAIL Interval: 14,434' to 14,470' & 14,482'to 14,522'. Fraed w/ 154,300lbs. of 16-20 Carbolite behind pipe. GENERAL WELL INFO API: 50-029-22681-00-00 Drilled and Cased by Nabors 22E - 6/16/1996 Perforated - 6/20/1996 ESP Completion by Polar 1-7/16/1996 ESP RWO by Nabors 4ES-7/8/2001 ESP RWO by Doyon 14-6/5/2004 ESP RWO by Nabors 3S-7/17/2008 ESP RWO by Doyon 16 - 6/15/2012 ESP RWO by Nordic 3 - 4/13/2015 Revised By: TDF 5/21/2015 Milne Point Unit Well: MPU F-18 PROPOSED Last Completed: 4/13/2015 HilcorP Alaelw, I.I.0 PTD: 196-100 Orifi KB Elev.: 28.25'/ GL Elev.: 12.40' IN 22E) TD=14,941' (MD) / TD = 7,53(YM) PBTD=14,834' (MD) / PBTD= 7,456(TVD) TREE & WELLHEAD Tree 2-9/16"SM FMC Wellhead 11" 5M FMC Tubing Hanger 2-7/8"WKM w/ 3" LH Acme Threads, 2.5" CIW H BPV Profile OPEN HOLE/ CEMENT DETAIL 20" 250 sx Arcticset I(Approx.) in a 24" Hole 9-5/8" 1,600 sx PF'E', 600 sx 'G', 150 sx PF 'E' in T12.25" Hole 7" 220 sx Class "G"in a8.5"Hole Size Type Wt/Grade/Conn ID Top Btm 20" Conductor 91.1/H-40/N/A N/A Surface 112' 9-5/8" Surface 40/L-80/Btrc. 8.835 Surface 7,914' 7" Production 26/L-80/Btrc 6.276 Surface 14,915' No Depth Item 1 ±140' GLM w/50 2 ±14,008' GLM w/ DGLV 3 ±14,155' 2-7/8" XN-Nipple 4 ±14,166' Discharge Head 5 ±14,167' Pump 6 ±14,184' Pump 7 ±14,191' Gas Separator 8 1 ±14,196' Upper Tandem Seal 9 ±14,203' Lower Tandem Seal 10 ±14,210' Motor 11 ±14,230' Centralizer— Bottom@ ±14,234 WELL INCLINATION DETAIL KOP @600' Max Hole Angle = 67 to 71 deg. f/ 3,700'to 13,300' Hole Angle thru penis = 45 Deg. No DLS = 3 Deg. / 100' STIMULATION DETAIL Interyal: 14,434' to 14,470' & 14,482'to 14,522'. Frac'd w/ 154,11lb, . of 16-20 Carbolite behind pipe. API: 50-029-22681-00-00 Drilled and Cased by Nabors 22E - 6/16/1996 Perforated — 6/20/1996 ESP Completion by Polar 1-7/16/1996 ESP RWO by Nabors 4ES-7/8/2001 ESP RWO by Doyon 14 — 6/5/2004 ESP RWO by Nabors 35 — 7/17/2008 ESP RWO by Doyon 16 — 6/15/2012 ESP RWO by Nordic 3 —4/13/2015 Revised By: TDF 2/14/2018 .H Ilii nq, AI.A.. LIA. 11" BOPE Milne Point ASR Rig 1 BOPE 2018 Updated 1/05/2018 3R or Pipe Rams ind es MPF -18 2/14/2018 2 9/16" 5K tree with 2 7/8" FMC Tubing Hanger 11x7" 5K Tbg spopol. FMC i Gen 5a.2 ea 21/16' 5K outs PN 83-600-617 Swab Valve -Cameron FLS -2 9/16' 5K, manual gate valve, EE PSL2, PR2 Wing Valve, Cameron Fly 2 9/16' 5K, reverse acting, actuated gate valve, w/ Baker actuator, EE PSL2 PR2 SSV Cameron FLS 29/16' 5K, reverse acting, actuated gate valve, w/ Baker actuator, EE PSL2 PR2 Master Cameron FIS FLS 29/16' 5K, manual gate valve, EE PSL2 PR2 Tbg Hd Adpter, FMC 7" %K x 11" 5K, rotating flanges top and bottom, w/ no control lines. lea ESP mandrel. No Heat trace. prepped for 2 7/8" seal sleeve UHilcorp Alaska, LLC Hilcorp Alaska, LLC Changes to Approved Rig Work Over Sundry Procedure Date: February 14, 2018 Subject: Changes to Approved Sundry Procedure for Well MP F-18 Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the rig workover (RWO) "first call' engineer. AOGCC written approval of the change is required before implementing the change. HAK Step Page Date Procedure Change Prepared B Initials) HAK Approved B (Initials) AOGCC Written Approval Received (Person and Date Approval: Prepared: Operations Manager Date Operations Engineer Date • STATE OF ALASKA AL ,KA OIL AND GAS CONSERVATION COM. .,SION REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon U Plug Perforations U Fracture Stimulate U Pull Tubing U Operations shutdown 11 Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ erforate New Pool ❑ Repair Well ❑., Re-enter Susp Well ❑ Other: ESP Change-out ❑I 2.Operator Name: 4.Well Class Before Work: 5.Permit to Drill Number: Hilcorp Alaska,LLC Development Q Exploratory ❑ 196.100 3.Address: Stratigraphic❑ Service ❑ 6.API Number: 3800 Centerpoint Drive,Suite 1400,Anchorage AK,99503 50-029-22681-00-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0355018 MILNE PT UNIT KR F-18 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): N/A MILNE POINT FIELD/ KUPARUK RIVER OIL POOL 11.Present Well Condition Summary: C Total Depth measured 14,941 feet Plugs measured 14,834 f E/`�E I L/�/E D true vertical 7,530 feet Junk measured 14,522 feet MAY 222015 Effective Depth measured 14,522 feet Packer measured N/A feet true vertical 7,240 feet true vertical N/A feet AOG CC Casing Length Size MD ND Burst Collapse Structural Conductor 112' 20" 112' 112' N/A N/A Surface 7,914' 9-5/8" 7,914' 4,529' 5,750psi 3,090psi Intermediate Production 14,915' 7" 14,915' 7,512' 7,240psi 5,410psi Liner . Perforation depth Measured depth See Attached Schematic feet SCANNED JUN 01 j 2015 True Vertical depth See Attached Schematic feet Tubing(size,grade,measured and true vertical depth) 2-7/8" 6.5#/L-8-/EUE 8rd 14,234' 7,038' Packers and SSSV(type,measured and true vertical depth) N/A N/A N/A N/A 12.Stimulation or cement squeeze summary: N/A Intervals treated(measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 91 92 1,380 280 232 Subsequent to operation: 202 _ 100 1,429 300 270 14.Attachments(required per 20 AAC 25 070.25 071,&25 283) 15.Well Class after work: Daily Report of Well Operations ❑., Exploratory❑ Development Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil Q Gas ❑ WDSPL❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 315-201 Contact Chris Kanyer Email ckanver( hilcorp.com Printed Name ©� Chris Kanyer Title Operations Engineer Signature /,�`� Phone 777-8377 Date 5/21/2015 IJ� '— .O__ Form 10-404 Revised 5/2015ye � Submi Original Only >r g-44/' RBDMS J� MAY 2 9 2015 • Milne Point Unit • 14 Well: MPU F-18 SCHEMATIC Last Completed: 4/13/2015 Hilcorp Alaska,LLC PTD: 196-100 CASING DETAIL Orig.KB Elev.:28.25'/GL Elev.:12.40 (N 22E) Size Type Wt/Grade/Conn ID Top Btm ' 20" Conductor 91.1/H-40/N/A N/A Surface 112' N ,' (;9 -5/8" Surface 40/L-80/Btrc. 8.835 Surface 7,914' } 7" Production 26/L-80/Btrc 6.276 Surface 14,915' a � 1 TUBING DETAIL 2-7/8" Tubing 6.5/L-80/EUE 8rd 2.441 Surface 14,234' 3/8" Capstring Stainless Steel N/A Surface 14,234' JEWELRY DETAIL ,' j No Depth Item • A ' 1 170' GLM: is �, 2 14,012' GLM: 3 14,155' 2-7/8"XN-Nipple =y 4 14,166' , Discharge Head: GPDIS 5 14,166.5' Pump:119P23/PMSXD 4' i «' 6 14,184' Pump:18P75/PMSXD ,; , 0 7 14,191' Gas Separator:GSTHVVXH6 P 41 8 14,196' , Upper Tandem Seal:GSB3DBUTSB/SB PFSA `a a 9 14,203' Lower Tandem Seal: GSB3DBUT SB/SB PFSA } a 10 14,210' Motor:CL5/MSP3-250/252hp/2,275V/67A 9-5/8"4 F 11 14,230' PumpMate&Centralizer-Bottom @ 14,234' } PERFORATION DETAIL 3/8"SSCapsrin: Kuparuk Sands Top(MD) Btm(MD) Top(ND) Btm(ND) FT Date Status A3/A2 Sands 14,434' 14,470' 7,178' 7,204' 36' 6/20/1996 Open AS/Sand 14,482' 14,522' 7,212' 7,240' 40' 6/19/1996 Open OPEN HOLE/CEMENT DETAIL 20" 250 sx Arcticset I(Approx.)in a 24"Hole 9-5/8" 1,600 sx PF'E',600 sx'G',150 sx PF'E'in a 12.25"Hole i 7" 220 sx Class"G"in a 8.5"Hole r: WELL INCLINATION DETAIL 2 KOP @ 600' 14, ' Max Hole Angle=67 to 71 deg. f/3,700'to 13,300' , '• Hole Angle thru perfs=45 Deg.No DLS=3 Deg./100' ti. P >. b; 1� TREE&WELLHEAD 4. 3 v 7"Shut jcirtf/ ,i '� Tree 2-9/16"SM FMC 14,196'to14,236 £ ' Wellhead 11" 5M FMC RA Tag @ 14,195 4Niii Tubing Hanger 2-7/8"WKM w/3"LH Acme Threads,2.5"CIW H BPV Profile ��s STIMULATION DETAIL A. 1 6 Interval:14,434'to 14,470'-128,320&14,482'to 14,522'. 4, si►- c 7 Frac'd w/154,1001bs.of 16-20 Carbolite behind pipe. ' I'a GENERAL WELL INFO API:50-029-22681-00-00 Drilled and Cased by Nabors 22E -6/16/1996 ;f• 9 Perforated-6/20/1996 � A ! M110 ESP Completion by Polar 1-7/16/1996 }' }• ESP RWO by Nabors 4ES-7/8/2001 11 ESP RWO by Doyon 14-6/5/2004 I 1 ESP RWO by Nabors 3S-7/17/2008 Fish Centralizer 9 pushed to 14,527 u, ESP RWO by Doyon 16-6/15/2012 Sands ESP RWO by Nordic 3-4/13/2015 TD=14,941'(MD)/TD=7,530'(TVD) PBTD=14,834'(MD)/PBTD=7,456(TVD) Revised By:TDF 5/21/2015 Hilcorp Alaska, LLC ,,;,,.ort) kla-.1;„_1.1A Weekly Operations Summary Well Name API Number Well Permit Number Start Date End Date MP F-18 50-029-22681-00-00 196-100 4/11/2015 4/13/2015 Daily Operations: 4/8/15-Wednesday No operations to report. 4/9/15-Thursday No operations to report. 4/10/15-Friday No operations to report. 4/11/15-Saturday MIRU Nordic 3 and associated equipment. Pulled BPV,spot kill tank, RU lines and prepped rig for kill operation. Loaded pits with hot seawater,tested lines to 3,000psi-test ok.SICP 450psi bled to Opsi,SITP 370psi bled to Opsi.Started pumping rev cir @ 4bpm broke circulation,continued cir until clean returns,520 bbls pumped,230bbls returned, 290bbls lost. Monitor well-on vac. RD hoses,set BPV, ND PT 4/12/15-Sunday NU BOP's and connected lines. Pulled BPV and installed TWC. Filled stack and performed shell test 250psi low/3,000psi high.Tested BOPE annular 250psi low/2,500psi high,valves 250psi low/3000psi high, Rams 250psi low/3,000psi high. Performed Koomey drawdown test and gas dection. No failures recorded. Pulled TWC, PU landing jt and MU to tbg hanger.Pulled 123k to unseat tbg hanger and pulled to rig floor. Meg ESP cable-good. Decompleted hanger, BO/LD same. Pull stand and thread cable to spooler.TOOH w/ESP completion.Tallied stands out, LD GLM's and XN nipple 4 jts of 2-7/8” (BAD PIN ENDS. BO/LD ESP assembly, no body wear or scale/sand around ESP intake.Visually inspected all other jts-good.Changed out cable spool, PU MU and service new ESP assembly. 4/13/15-Monday PU, MU and service new ESP assembly.String new cable over sheave. Make motor connection. RIH w/new ESP on 2- 7/8"8rd L-80 tbg with XN nipple and Lower GLM.Continue RIH,check cable every 2,000'. ROH to 9,115'.Changed spool, spliced cable and tested-ok. PU upper GLM,continue RIH with ESP completion to hanger depth 14,233'. Depths are as follows: Hanger, Pup,4 jts 2-7/8 L-80 6.5#tbg, pup,GLM @ 156',334 jts tbg, pup GLM @ 14,012',4 jts tbg,XN Nipple@ 14,154', pup. Head @ 14,166',gas separator @ 14,191',Tandem Seals @ 14,196', Motor @ 14,210', EOT Centralizer 14,231'. PU/MU Tub Hanger, PU landing joint. Install penetrators.Tested cable.Cut and splice cable connector install same. Meg check connector. Land string SW 125K up 65k down. Run in lock down screws. ND BOP/NU tree.Orient tree.Test all breaks and void to 250psi low/5,000psi high. RDMO Nordic 3 4/14/15-Tuesday No operations to report. �,w �\1/77s7 THE STATE Alaska Oil and Gas .�,;,,,-�=�.��, o Conservation Commission _ f L iS -' ' tt ___ _ 333 West Seventh Avenue e, Alaska 99501-3572 Anchorage,*h � GOVERNOR BILL WALKER OF+�ArAI P Main: 907.279.1433 ALAS Fax: 907 276.7542 Scat* tw www aogcc alaska.gov Chris Kanyer r_ 10 Operations Engineer �fJ Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Milne Point Field, Kuparuk River Oil Pool, MPU KR F-18 Sundry Number: 315-201 Dear Mr. Kanyer: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, 49 Daniel T. Seamount, Jr. Commissioner DATED this 9 day of April, 2015 Encl. RECEIVED • STATE OF ALASKA APR 0 6 20th ' ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS AOGCC 20 MC 25.280 1.Type of Request: Abandon❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well 0' Change Approved Program 0 . . Suspend❑ Plug Perforations❑ Perforate❑ Pull Tubing❑• Time Extension 0 Operations Shutdown❑ Re-enter Susp.Well ❑ Stimulate❑ Alter Casing❑ Other: ESP Change-out ❑✓ • 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number. Hilcorp Alaska,LLC • Exploratory ❑ Development 0 ' 196-100 ' 3.Address: Stratigraphic ❑ Service ❑ 6.API Number. 3800 Centerpoint Drive,Suite 1400,Anchorage AK,99503 50-029-22681-00-00 4 7.If perforating: 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? C.O.432C ' Will planned perforations require a spacing exception? Yes 0 No ❑ MILNE PT UNIT KR F-18 • 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL0355018 • MILNE POINT FIELD/KUPARUK RIVER OIL POOL • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 14,941 - 7,530 • 14,522' 7,240 14,834' 14,522'Fish ' Casing Length Size MD ND Burst Collapse Structural Conductor 112' 20" 112' 112' Surface 7,914' 9-5/8" 7,914' 4,529' 5,750psi 3,090psi Intermediate Production 14,915' 7" 14,915' 7,512' 7,240psi 5,410psi Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Attached Schematic See Attached Schematic 2-7/8" 6.5#/L-80/EUE 8rd 14,259 Packers and SSSV Type: Packers and SSSV MD(ft)and ND(ft): N/A and N/A N/A and N/A 12.Attachments: Description Summary of Proposal ❑✓ 13.Well Class after proposed work. Detailed Operations Program ❑ BOP Sketch ❑., Exploratory ❑ Stratigraphic❑ Development❑j • Service ❑ 14.Estimated Date for 15.Well Status after proposed work: Commencing Operations: 4/12/2015 Oil ❑✓ • Gas 0 WDSPL 0 Suspended 0 16.Verbal Approval: Date: WINJ ❑ GINJ 0 WAG ❑ Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Chris Kanyer Email ckanyer@hilcorp.com Printed Name Chris Kanyer Title Operations Engineer Signature //n Phone 777-8377 Date 4/6/2015 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 316-2c)\ Plug Integrity ❑ BOP Test Mechanical Integrity Test ❑ Location Clearance ❑ Other: -A:3600 �S. & eSf- (MASI° = °PS' Spacing Exception Required? Yes ❑ No NodSubsequent Form Required: /0-4-1Ly APPROVED BY „/ Approved by: -.2-Y/ COMMISSIONER THE COMMISSION Date: 4 / / 7-/s � 1i�/I- �i4 9' V% Submit Form and Form 10-403( ised 10/2012) OpRvicGplicNiAtclforp 12 months fronith clata_of approval. m s in D e_ 2015 �,�/�/7 ,� RBD � i fit' 9 J Well Prognosis • Well: MPF-18 Hilcorp Alaska,LL Date:4/6/2015 Well Name: MPF-18 API Number: 50-029-22681-00-00 Current Status: SI Producer Pad: F Pad Estimated Start Date: April 12, 2015 Rig: Nordic 3 Reg.Approval Req'd? April 10, 2015 Date Reg.Approval Rec'vd: Regulatory Contact: Tom Fouts Permit to Drill Number: 196-100 First Call Engineer: Chris Kanyer (907) 777-8377 (0) (907)250-0374 (M) Second Call Engineer: Bo York (907) 777-8345 (0) (907) 727-9247 (M) AFE Number: Current Bottom Hole Pressure: —2,850 psi @ 7,000' TVD (Last BHP measured 5/4/2014) Maximum Expected BHP: —2,850 psi @ 7,000' TVD (No new perfs being added) Max. Allowable Surface Pressure: 0 psi (Based on actual reservoir conditions and water cut of 90% (0.429psi/ft)with an added safety factor of 1000'TVD of oil cap) Brief Well Summary: The Milne Point F-18 well was drilled as a Kuparuk development well that TD'd at a depth of 14,941' and ran and cemented 7" production casing in June 1996. The well was perforated and frac'd in the Kuparuk A sands and initially completed with an ESP. The well has had an ESP fail & replaced in 2004, 2008, & 2012. The most recent casing pressure test was performed to 3,500psi (with 10.6ppg fluid) for 30min on 6/13/2012. The most recent pump died on March 277 2015.The well has remained shut in ever since. A downhole chemical injection line will be run as part of the new completion, due to some scaling issues in this well. No subsidence issues are expected in this well. ' Notes Regarding Wellbore Condition Current well status is shut in oil producer. No subsidence issue suspected. RWO Objective: Pull ESP& run 2-7/8" ESP completion with downhole chemical injection. Brief Procedure: 1. MIRU Nordic#3 Rig. 2. Attempt to circulate well with 8.5ppg brine. Monitor well. 3. ND tree, NU 11" BOPE and test to 250psi low/3,000psi high, annular to 250psi low/2,500psi high. a. Notify AOGCC 24hrs in advance to witness test. 4. Contingency: (If the tubing hanger won't pressure test due to either a penetrator leak or the BPV profile is eroded and/or corroded and BPV cannot be set with tree on.) a. Notify Operations Engineer(Hilcorp), Mr.Guy Schwartz(AOGCC)and Mr.Jim Regg(AOGCC)via email explaining the wellhead situation prior to performing the rolling test. AOGCC may elect to send an inspector to witness. b. With stack out of the test path,test choke manifold per standard procedure Well Prognosis • Well: MPF-18 Hilcorp Alaska,LL Date:4/6/2015 c. Conduct a rolling test: Test the rams and annular with the pump continuing to pump, (monitor the surface equipment for leaks to ensure that the fluid is going down-hole and not leaking anywhere at surface.) d. Hold a constant pressure on the equipment and monitor the fluid/pump rate into the well. Record the pumping rate and pressure. e. Once the BOP ram and annular tests are completed,test the remainder of the system following the normal test procedure(floor valves,gas detection, etc.) f. Record and report this test with notes in the remarks column that the tubing hanger/BPV profile/ penetrator wouldn't hold pressure and rolling test was performed on BOP Equipment and list items, pressures and rates. g. Pull hanger to surface. (Requires tubing cuts as necessary to free tubing). CBU to displace annulus and tubing with kill weight fluid. h. If a rolling test was conducted, remove the old hanger, MU new hanger or test plug to the completion tubing. Re-land hanger(or test plug) in tubing head. Test BOPE per standard procedure. 5. Unseat hanger and pull 2-7/8" ESP completion from 14,259'to surface and lay down same. 6. MU and RIH with ESP with gas separator and 3/8"chemical injection line on 2-7/8" 8RD EUE L-80 tubing [to be replaced if necessary]. Set ESP at+/-14,259'. Land tubing hanger. 7. ND BOP, NU and tree. 8. RDMO workover rig and equipment. 9. Turn well over to production. Attachments: 1. As-built Schematic 2. Proposed Schematic 3. BOP Schematic Milne Point Unit . II Well: MPU F-18 SCHEMATIC Last Completed: 6/14/2012 Ilacorp Alaska,LLC PTD: 196-100 CASING DETAIL Orig.KB Elev.:28.25'/GL Elev.:12.40'(N 22E) Size Type Wt/Grade/Conn ID Top Btm 1.4, 20" Conductor 91.1/H-40/N/A N/A Surface 112' 2p , 9-5/8" Surface 40/L-80/Btrc. 8.835 Surface 7,914' 7" Production 26/L-80/Btrc 6.276 Surface 14,915' m 1 TUBING DETAIL +: 2-7/8" Tubing 6.5/L-80/EUE 8rd 2.441 Surf 14,259' JEWELRY DETAIL R V, No Depth Item 1 1 175' 2-7/8"x 1"KBMG-M-2 GLM w/DPSOV ' l; 2 13,983' 2-7/8"x 1"KBMG-M-2 GLM w/DGLV 3 14,137' HES 2-7/8"XN-Nipple (2.250 No-go) ( 4 14,185.5' GPDIS Discharge Head �' 5 14,186 Tungsten Pump,119 P23 , 6 14,203' Tungsten Pump,118-P751 k '" 7 14,210' Gas Separator GSTHV A >' k'. 8 14,216' Upper Tandem Seal-GSB3DBUT SB/SB PFSA:Lower-GSB3DBIT SB/SB PFSA t 9 14,230' MPS-1 Motor-336HP/2,650V/77Amp;Re-Rated 240hp/2,455V/59Amp 4 10 14,255' PumpMate XTO Sensor 1" 11 14,257' Centralizer-Bottom @ 14,259' 9-5/8". Iii PERFORATION DETAIL Kuparuk Sands Top(MD) Btm(MD) Top(ND) Btm(TVD) FT Date Status A3/A2 Sands 14,434' 14,470' 7,178' 7,204' 36' 6/20/1996 Open A1/Sand 14,482' 14,522' 7,212' 7,240' 40' 6/19/1996 Open OPEN HOLE/CEMENT DETAIL 20" 250 sx Arcticset I(Approx.)in a 24"Hole 9-5/8" 1,600 sx PF'E',600 sx'G',150 sx PF'E'in a 12.25"Hole 7" 220 sx Class"G"in a 8.5"Hole WELL INCLINATION DETAIL . 4 YKOP@600' 2 ;+' Max Hole Angle=67 to 71 deg. f/3,700'to 13,300' Hole Angle thru perfs=45 Deg.No DLS=3 Deg./100' ot TREE&WELLHEAD ti, Tree 2-9/16"5M FMC T'Shortjantf/ { 3 Wellhead 11" 5M FMC 14,196 to 14,236. '� t t Tubing Hanger 2-7/8"WKM w/3"LH Acme Threads,2.5"CIW H BPV Profile RATag©14,196 � STIMULATION DETAIL Ili a lax 0a Interval:14,434'to 14,470'-128,320&14,482'to 14,522'. ti`6 Frac'd w/154,1001bs.of 16-20 Carbolite behind pipe. t, 4i _ 0 7 GENERAL WELL INFO 4" `n8 API:50-029-22681-00-00 t: Drilled and Cased by Nabors 22E -6/16/1996 II +Vy Perforated-6/20/1996 1 ESP Completion by Polar 1-7/16/1996 / ?r t 9 ESP RWO by Nabors 4ES-7/8/2001 P, P!- "10 ESP RWO by Doyon 14-6/5/2004 CESP RWO by Nabors 35-7/17/2008 7 11 r ESP RWO by Doyon 16-6/15/2012 Fish-Centralize f pushed to 14,527 r41, a IN TD=14,941'WO)/TD=7,530'(TVD) PBTD=14,834'(MD)/PBTD=7,456'(TVD) Revised By:TDF 4/6/2015 Milne Point Unit . fir Well: MPU F-18 • PROPOSED Last Completed: 6/14/2012 llilcorp Alaska,LLC PTD: 196-100 CASING DETAIL Orig.KB Elev.:28.25'/GL Elev.:12.40'(N 22E) Size Type Wt/Grade/Conn ID Top Btm k 20" Conductor 91.1/H-40/N/A= N/A Surface 112' 20'4 •f y 9-5/8" Surface 40/L-80/Btrc. 8.835 Surface 7,914' 7" Production 26/L-80/Btrc 6.276 Surface 14,915' w: I 1 TUBING DETAIL 2-7/8" Tubing 6.5/L-80/EUE 8rd 2.441 Surface ±14,259' t• 3/8" Capstring Stainless Steel N/A Surface ±14,259' i %, JEWELRY DETAIL No Depth Item d 1 ±175' GLM 2 ±13,983' GLM 3 ±14,137' HES 2-7/8"XN-Nipple (2.250 No-go) 4 ±14,185.5' GPDIS Discharge Head 1. • 5 ±14,186 Pump t 6 ±14,203' Pump f ' i R 7 ±14,210' Gas Separator V, 8 ±14,216' Upper Tandem Seal . 9 ±14,230' Motor t 10 ±14,255' PumpMate XTO Sensor 9-5 ,Y /8" " 11 ±14,257' Centralizer-Bottom @±14,259' PERFORATION DETAIL 3/8"SSCapstrinKuparuk Sands Top(MD) Btm(MD) Top(ND) Btm(ND) FT Date Status A3/A2 Sands _ 14,434' 14,470' 7,178' 7,204' 36' 6/20/1996 Open Ai/Sand 14,482' 14,522' 7,212' 7,240' 40' 6/19/1996 Open OPEN HOLE/CEMENT DETAIL 20" 250 sx Arcticset I(Approx.)in a 24"Hole 9-5/8" 1,600 sx PF'E',600 sx'G',150 sx PF'E'in a 12.25"Hole .A �� 7" 220 sx Class"G"in a 8.5"Hole E 0 4 WELL INCLINATION DETAIL 2A KOP @ 600' Max Hole Angle=67 to 71 deg. f/3,700'to 13,300' a 4% Hole Angle thru perfs=45 Deg.No DLS=3 Deg./100' y0, w; i '� TREE&WELLHEAD •7"ShortjcintN ' ri a 1 Tree 2-9/16"SM FMC 14,195 to 14,236'. Wellhead 11" 5M FMC RATag(014,195 %4 Tubing Hanger 2-7/8"WKM w/3"LH Acme Threads,2.5"CIW H BPV Profile I NI; * 61ii 5 STIMULATION DETAIL 'N 6 Interval:14,434'to 14,470'-128,320&14,482'to 14,522'. ;�v `,Z' i►, 07 Frac'd w/154,100Ibs.of 16-20 Carbolite behind pipe. to 8 GENERAL WELL INFO !; i% API:50-029-22681-00-00 9 Drilled and Cased by Nabors 22E -6/16/1996 t Perforated-6/20/1996 .110 ESP Completion by Polar 1-7/16/1996 iESP RWO by Nabors 4ES-7/8/2001 •u 17 ESP RWO by Doyon 14-6/5/2004 'f� 4,i ESP RWO by Nabors 3S-7/17/2008 Fish Centralize t ESP RWO by Doyon 16-6/15/2012 pushed to 14,522 4; IINKUP Sarxls 1 1 TD=14,941'(MD)/1D=7,530'(1VD) PBTD=14,834'(MD)/PBTD=7,456'(TVD) Revised By:TDF 4/6/2015 11" BOP Stack ,glY0 1 \ 0 1110111111111111, Hydril 11" 5M ial.-H \ 2 =-• --- --- Shaffer , , ----1-'- - - 2 3/8" Rams (tti",- ) =r-mio : ..=i____ _ _ 11" 5M is : _ 2 7/8-5.5 . * - variables Hydril I: 11" 5M MEL - Blinds=a *. Optional valve port 1 . I. 1 ( * / 1 i dipl 1 ii .... ! li ;1011 1 II I V _ . XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. File Number of Well History File PAGES TO DELETE RESCAN Complete [] Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned by:.Bevedy~ Vincent Nathan Lowell [] TO RE-SCAN Notes: Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: Is~ - STATE OF ALASKA RECEIVED AKA OIL AND GAS CONSERVATION COOISSION REPORT OF SUNDRY WELL OPERATIONS JUL 0 9 2012 1. Operations Performed: Alilics O 8 Gas C�. i IIII iwI ❑ Abandon ❑ Repair Well ❑ Plug Perforations ❑ Perforate ❑ Re -Enter Susp ❑ Alter Casing _4 Pull Tubing ' ❑ Stimulate - Frac ❑ Waiver ® Other ❑ Change Approved Program ❑ Operation Shutdown ❑ Stimulate - Other ❑ Time Extension Change out ESP ' 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ® Development ❑ Exploratory o 196 - 100 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 • 50 029 - 22681 - 00 - 00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL 025509 & 355018 ' .. MPF -18 9. Logs (list logs and submit electronic and printed data per 20AAC25.071): 10. Field / Pool(s): Milne Point Unit / Kuparuk Rive 7r) i-. 11. Present well condition summary Total depth: measured 14941 - feet Plugs (measured) None feet true vertical 7630 • feet Junk (measured) Fish at 14522' feet Effective depth: measured 14834 feet Packer: (measured) feet true vertical 7456 feet Packer: (true vertical) feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 112' 112' 1490 470 Surface 7883' 9 -5/8" 7914' 4529' 5750 3090 Intermediate Production 14886' 7" 14915' 7512' 72‘1'6 5410 Liner Perforation Depth: Measured Depth: 14434' - 14522' s•:I t1 , U(.JL 2 ' ?, /03 True Vertical Depth: 7178' - 7241' Tubing (size, grade, measured and true vertical depth): 2 - 7/8" 6.5#, L - 14259' 7055' Packers and SSSV (type, measured and true vertical depth): N/A 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 203 89 1566 320 250 Subsequent to operation: 151 103 3400 280 223 14. Attachme ❑Copies of Logs and Surveys run 15. Well Class after work: . ❑ Exploratory ® Development ❑ Service ❑ Stratigraphic _■ Daily Report of Well Operations 16. Well Status after work: "" _C Oil . ❑ Gas ❑ WDSPL ® Well Schematic Diagram ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact David Bjork, 564 -5683 N/A Printed Nam e Lasts fka 1 Title Drilling Technologist l ` J � j , Prepared By Name /Number Signature k \ 'i Phone 564 - 4091 Date / 2 -∎ Joe Lastufka, 564 -4091 • Form 10 -404 Revise 1/2011 ' - ip Q p mit Original Only y aMS JUL 1 2012 !4" -7 -17 - �q, \O- C 34� • • � /if d > �r� /F?' ,�..�'r�/ /� � /'/ ri 5 '^ /' �` / 7":„, /' / 4/ r . // /may /i. Common Well Name: MPF -18 AFE No Event Type: WORKOVER (WO) Start Date: 6/6/2012 End Date: X4- OOWCL -E: (1,900,000.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/3/1996 12:00:OOAM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @42.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 6/8/2012 00:00 - 00:30 0.50 MOB P PRE PJSM FOR PULLING OFF MPF -94 AND MOVING ON MPF -18. - REVIEW SOP FOR PULLING OFF WELL AND SPOTTING RIG OVER WELL. - DDI SAFETY REP, TOOLPUSHER, WSL AND RIG CREW IN ATTENDANCE. 00:30 01:00 0.50 MOB P PRE PREP RIG FOR MOVE OFF WELL. - NOTIFY F -PAD OPERATOR TO MOVE OFF WELL. - JACK RIG UP, REMOVE SHIMS AND RIG MATTS. 01:00 - 01:45 0.75 MOB P PRE MOVE RIG OFF MPF -94. - MOVE RIG DOWN PAD AND LINE UP TO BACK ONTO MPF -18. - NOTE MPF -18, BPV IN PLACE. I /A= 1150 PSI. O /A= 270 PSI. - CLOSE ALL TREE VALVES. 01:45 - 03:30 1.75 MOB P PRE SPOT RIG OVER MPF -18. - CENTER OVER HOLE. - WSL, TOOLPUSHER, DDI SAFETY REP. AND F -PAD OPERATOR WITNESSED. - SHIM AND SET RIG DOWN. 03:30 - 06:00 2.50 RIGU P PRE PJSM, REVIEW SOP FOR R/U KILL MANIFOLD, CIRC MANIFOLD AND LINES. - R/U KILL MANIFOLD IN CELLAR. - WELL SUPPORT SET FLOW BACK TANK AND R/U HARDLINE. - TEST HARD LINE AGAINST ISOLATION VALVE ON FBT. - TEST HARD LINE TO 250/3500 PSI FOR 5 MINUTES. - SPOT SLOP TANK, FUEL TANK AND CREW TRAILER. - TAKE ON 10.6 PPG KWF. - RIG ACCEPTED ON MPF -18 AT 0400 HRS. 06:00 - 06:30 0.50 KILLW P DECOMP RIG EVACUATION DRILL, FIRE IN THE PUMP ROOM. - DRILL ANNOUNCED, FORK LIFT GUARDED ENTRANCE TO PAD. - ALL HANDS ACCOUNTED FOR. AAR. GOOD RESPONSE TIME. 06:30 - 08:00 1.50 KILLW P DECOMP PJSM. PRESSURE TEST LINES. - BRING ON 10.6 PPG BRINE TO PITS. - TEST HARDLINE & KILL MANIFOLD 250 / 3500 PSI. - 5 MIN EACH TEST / CHARTED, OK. - ALL 1502 HAMMER UNIONS TESTED, (1) SEAL CHANGED OUT. 08:00 - 08:30 0.50 KILLW P DECOMP RIG EVACUATION DRILL, FIRE IN ENGINE ROOM. - PAD SECURED, NOTIFICATIONS MADE, GOOD RESPONSE TIME. - ALL HANDS ACCOUNTED FOR, GOOD AAR WITH REGARD TO EACH HAND'S DUTIES. GOOD DISCUSSION. Printed 7/5/2012 9:00:56AM �#� / �.;.r / y / � �( %!' ; y ,4i! �/4' } J// /4-7 4.-0,i/0,4-7 Common Well Name: MPF -18 AFE No Event Type: WORKOVER (WO) Start Date: 6/6/2012 End Date: X4- 00WCL -E: (1,900,000.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/3/1996 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @42.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:30 - 11:30 3.00 KILLW P DECOMP PJSM. P/U LUBRICATOR & TEST @ 250 / 3500 PSI. - 5 MIN EACH / CHARTED. PULL BPV. - 1150 PSI SITP, 1150 PSI SICP, 350 PSI ON THE 0/A. - RIG DOWN / LAY DOWN LUBRICATOR. 11:30 - 13:00 1.50 KILLW P DECOMP CHECK TIGER TANK, TEST OVER FILL ALARM. - ENSURE BAFFLE IS SECURED, INSPECT ALL LINES. 13:00 - 14:00 1.00 KILLW P DECOMP PRE JOB SAFETY MEETING ON WELL KILL. - NOTE WIND DIRECTION. - WIND IS BLOWING FROM TIGER TANK TO RIG. - OPT TO MOVE TANK AND RESUME WELL KILL IN AM. 14:00 - 17:00 3.00 KILLW N WAIT DECOMP WHILE WAITING FOR WIND DIRECTION CHANGE DUE TO TIGER TANK PLACEMENT. - PJSM, R/D STABBING BOARD AND MOTOR. 17:00 - 00:00 7.00 KILLW N WAIT DECOMP CONTINUE WAITING FOR WIND DIRECTION CHANGE. - COMPLETE POST WELL TRANSFER PERMIT ON MPF -94 WITH DSO. - PJSM, HANG SHEAVE IN DERRICK FOR PULLING ESP CABLE. - LOAD 4" DRILL PIPE IN PIPE SHED. - NUMBER AND STRAP DRILL PIPE. - WEIGHT UP KWF BRINE IN PITS FROM 8.5 PPG TO 8.6 PPG KWF. - NOTIFY WELL SUPPORT TO COME OUT AND SPOT TIGER TANK DOWN WIND FROM RIG. - TBG AND CSG = 1150 PSI. O /A= 270 PSI. 6/9/2012 00:00 - 01:30 1.50 KILLW N WAIT DECOMP WAIT ON WELL SUPPORT TO MOVE TIGER TANK DUE TO WIND DIRECTION. ✓ - CONDUCT WELL KILL OPS DURING DURING DAY SHIFT AS PER WELL PROGRAM. 01:30 - 02:00 0.50 KILLW P DECOMP RIG EVACUATION DRILL, METHANE ALARM IN CELLAR.. - LOADER OPERATOR SECURED PAD, GOOD RESPONSE TIME. - NOTIFICATIONS MADE, - ALL RESPONDED EXCEPT FOR 3 CENTRALIFT HANDS WHICH WERE HEADED FOR PAD ENTRANCE. CONDUCT AAR: - ALL HANDS WORKING ON THE PAD NEED TO MONITOR OUR HUB. - WHEN THEY CHECK IN WITH SCS THEY ARE INSTRUCTED TO DO SO. - ALL RIG HANDS RESPONDED WITH AIR PACKS. - CH2MHILL DRIVERS RESPONDED QUICKLY. 02:00 - 07:30 5.50 KILLW N WAIT DECOMP WELLS SUPPORT ON LOCATION. - WITH DSO APPROVED TIGER TANK LOCATION. - R/D TIGER TANK AND MOVE TO ODS DOWN WIND OF RIG. - M/U AND TEST HARDLINE TO 250/3500 PSI. - TEST TIGER TANK OVERFILL ALARM. - CONDUCT WELL KILL OPS DURING DURING DAY SHIFT AS PER WELL PROGRAM. Printed 7/5/2012 9:00:56AM " , 0./e,' r / ,. ,, e x ' s PP Z.,3r .,x y . l'" , fr''', 7 % , v 4 ")•- ' . ,.,,., Common Well Name: MPF -18 AFE No Event Type: WORKOVER (WO) Start Date: 6/6/2012 End Date: X4- 00WCL -E: (1,900,000.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/3/1996 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @42.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 08:30 1.00 KILLW P DECOMP PJSM. REVIEW DDI SOP FOR WELL KILL. - ATTENDED BY RIG CREW, RWO FIELD SUPERINTENDANT, WSL, TOOL PUSHER. - REVIEW PLAN FORWARD FOR WELL KILL. - DISCUSS EACH STEP IN DETAIL. - DISCUSS VALVE ALIGNMENT - VERIFY ROLES AND RESONSIBILITIES. - 07:30 HRS WSL NOTIFIED OF DROPPED 2 7/8" TEST JOINT. - 08:00 HRS NOTIFICATIONS MADE OF DROPPED TEST JOINT TO RWO FIELD FIELD SUPERINTENDANT AND WTL. - INVESTIGATION PENDING. 08:30 - 10:00 1.50 KILLW P DECOMP KILL WELL AS PER WELL PLAN. - SHUT IN PRESSURES 1150 PSI ON TUBING AND VA. - VERIFY VALVE ALIGNMENT. - BLEED GAS OFF VA THROUGH CHOKE TO FLOW BACK TANK . - KEEP LINE TO FLOW BACK TANK BELOW 150 PSI. - 1100 PSI ON TUBING. - PUMP 85 BBLS DOWN TUBING @3.5 BPM. - WITH RETURNS THROUGH CHOKE TO FLOWBACK TANK. - KEEP LINE TO FLOW BACK TANK BELOW 150 PSI. - ICP =1700 PSI / FCP =1250 PSI. - SHUT IN VA. - BULLHEAD 40 BBLS DOWN TUBING @ 3.5 BPM - ICP =1250 PSI / FCP =1625 PSI - LOSSES TO WELL IN THE LAST 12 HRS= 53 BBLS. 10:00 - 12:00 2.00 KILLW P DECOMP PUMP 200 BBLS DOWN TUBING a 3 BPM._ - ICP =1100 PSI / FCP =1225 PSI. - SHUT IN WELL. - VAC OUT FLOW BACK TANK. 12:00 - 12:15 0.25 KILLW P DECOMP CREW CHANGE. - PJSM WITH WSL. RWO FIELD SUPERINTENDANT, TOOL PUSHER AND CREW. - TUBING 0 PSI, ANN 900 PSI. 12:15 - 16:00 3.75 KILLW P DECOMP PUMP 3 BPM DOWN TUBING. - WITH RETURNS THROUGH CHOKE TO FLOWBACK TANK. - KEEP LINE TO FLOW BACK TANK BELOW 150 PSI. - 1150 PSI TUBING, 450 PSI ANN. - SHUT IN WELL. Printed 7/5/2012 9:00:56AM • xv/1/1; 7/7/ ;-1;4+477, • . 41 7 4/ • 4 ,44 j AS fie'' � 9 e/ "144 " fr/ Common Well Name: MPF -18 AFE No Event Type: WORKOVER (WO) Start Date: 6/6/2012 End Date: X4- 00WCL -E: (1,900,000.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/3/1996 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @42.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:00 - 18:00 2.00 KILLW P DECOMP MONITOR WELL PRESSURE. - TUBING= 0 PSI. I /A= 350 PSI. - CONTINUE PUMPING 3 BPM DOWN TUBING 870 PSI. - WITH RETURNS THROUGH CHOKE TO FLOWBACK TANK. - KEEP LINE TO FLOW BACK TANK BELOW 150 PSI. - FCP= 3 BPM 910 PSI. - SHUT DOWN PUMP. - TOTAL PUMPED FOR WELL KILL= 753 BBLS. - TOTAL RETURNS TO FLOW BACK TANK= 540 BBLS - 17:30 HRS AOGCC BOB NOBLE WAIVED WITNESS FOR BOP TEST. 18:00 - 18:30 0.50 KILLW P DECOMP MONITOR WELL FOR 30 MINUTES. - 0 PSI ON TUBING, 0 PSI ON ANN. BOTH ON SLIGHT VAC. - WELL IS DEAD WITH BOTH TUBING AND ANN. ON SLIGHT VAC. 18:30 - 20:00 1.50 WHSUR P DECOMP R/D KILL MANIFOLD LINES. - R/U TO FILL VA WITH RIG PUMP AND BLEEDER LINE. - TO PERFORM ROLLING TEST ON TWC. - KEEP BACKSIDE FULL USING CHARGE PUMP- MONITOR FILL VOLUMES. 20:00 - 21:00 1.00 WHSUR P DECOMP PJSM FOR SETTING TWC. REVIEW DDI SOP FOR SETTING TWC. - CLOSE MASTER VALVE. - R/U LUBRICATOR, TEST TO 250/3500 PSI 5 MIN EACH. - CHART RECORD TESTS. - OPEN MASTER VALVE. - INSTALL TWC. 21:00 - 22:30 1.50 WHSUR P DECOMP PERFORM 500 PSI ROLLING TEST UNDER , TWC PI IMPINC; f)oWN VA - PUMPING 3 BPM 500 PSI FOR 2 MIN TO 2 BPM 500 PSI8 MIN. - WELL TOOK 22 BBLS DURING 10 MIN TEST. - TEST TOP TWC TO 250/3500 PSI 5 MIN. EACH. - CHART TESTS. - RID AND LOAD OUT LUBRICATOR. - CONTINUE TO FILL DOWN VA WITH CHARGE PUMP AND BLEED LINE. - BARRIERS IN PLACE- TESTED TWC, HANGER SEALS AND 10.6 PPG KWF. Printed 7/5/2012 9:00:56AM • ' ' "/ r. - ' ':‘?//'/X / i ,/, 0. ,,, ,,07: , ,, , .:;,..'ff.:: , ,';;" , 7 , /<,/,'./ Of", '°. 443f*Y/ ii"A '49; t "VA. .e:/ , , -5: / 7 /.‘ • 5 '' /7/, 4 ;0, :,•;,, /,-;-.1 ".:1:c, ;?P :',.,'••41„,;:' . ,,,,,;'/ . 4,7i, ",,yr/ Common Well Name: MPF -18 AFE No Event Type: WORKOVER (WO) Start Date: 6/6/2012 End Date: X4- O0WCL -E: (1,900,000.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/3/1996 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @42.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 00:00 1.50 WHSUR P DECOMP PJSM, REVIEW DDI SOP FOR N/D TREE AND N/U BOPE. - VAC OUT FLUID IN TREE. - FMC REP BLEED TBG HANGER VOID . - N/D TREE, INSPECT 3" LH ACME TBG HANGER THREADS. - FMC M/U X/O IN TBG HANGER TO VERIFY THREAD INTEGRITY. - LOSSES TO WELL IN LAST 12 HRS= 108 BBLS. - LOSSES TO WELL IN LAST 24 HRS= 161 BBLS. - O /A= 340 PSI. - CONTINUE TO FILL DOWN VA WITH CHARGE PUMP AND BLEED LINE - MONITOR HOLE FILL VOLUME- TAKING 13 -14 BPH. 6/10/2012 00:00 - 05:00 5.00 BOPSUR P DECOMP N/U BOPE - N/U 7 1/16" X 13 5/8" 5M SPACER SPOOL. - N/U 4 PREVENTER BOP. - CONTINUE TO FILL DOWN VA WITH CHARGE PUMP AND BLEED LINE WITH 10.6 PPG KWF. - MONITOR HOLE FILL VOLUME- TAKING 13 -14 BPH. 05:00 - 05:30 0.50 BOPSUR P DECOMP PJSM FOR TESTING BOP, REVIEW DDI SOP. - R/U TO TEST BOPE. 05:30 - 11:00 5.50 BOPSUR P DECOMP TEST BOPE AS PER AOGCC AND BP Q REQUIREMENTS. Y - TEST ALL RAMS AND VALVES @ 250 / 3500 v PSI 5 MIN EACH. 1 y - ALL TESTS CHARTED. TESTED VBRS W/ 2 7/8" & 4" TEST JTS. - TEST ANNULAR PREVENTOR W/ 2 7/8" TEST JT @ 250 / 3500 PSI. - DRAW DOWN TEST PERFORMED ON ACCUMULATOR, OK. - ALL TESTS WITNESSED BY DOYON TOOL PUSHER. - RIG DOWN TEST EQUIPMENT. - BLOW DOWN CHOKE MANIFOLD AND KILL LINE. 11:00 14:00 3.00 BOPSUR P DECOMP PJSM. RIG UP DUTCH RISER AND LUBRICATOR. - LOCK DOWNS ON DUTCH RISER LOCKED UP DUE TO CORROSION. - FREE UP SAME, REMOVE, EMERY CLOTH OFF AND REPLACE 0 RINGS. - RUN IN LOCK DOWNS ON DUTCH RISER. 14:00 16:00 2.00 BOPSUR P DECOMP PJSM. P/U LUBRICATOR. PRESSURE TEST. - PRESSURE TEST LUBRICATOR 250 / 3500 PSI / 5 MIN / CHARTED. - PULL TWO WAY CHECK VALVE. LID LUBRICATOR. 16:00 - 17:00 1.00 BOPSUR P DECOMP BLOW DOWN LINES, RIG DOWN HOLE FILL LINE ON ANNULUS. Printed 7/5/2012 9:00:56AM �j e � 3 A n e t r �Y , r i � 4 + , Common Well Name: MPF -18 AFE No Event Type: WORKOVER (WO) Start Date: 6/6/2012 End Date: X4- 00WCL -E: (1,900,000.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/3/1996 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @42.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:00 - 17:15 0.25 PULL P DECOMP PJSM FOR PULLING AND UD HANGER . REVIEW DDI SOP. - WITH CENTRALIFT, FMC, WSL, TOOLPUSHER AND CREW. - REVIEW PLAN FOR CUTTING AND SECURING ESP CABLE. - REVIEW STEPS IN WELL PLAN. 17:15 - 19:30 2.25 PULL P DECOMP M/114" LANDING JT WITH 3" LH ACME PUP. - M/U TOP DRIVE, FMC REP BOLDS. - CLEAR RIG FLOOR. UNSEAT HANGER- 115K, INCLUDES 40K TOP DRIVE WT. - WELL CONTINUES TAKING FLUID. - PHI.' HANGER TO RIG FLOOR, P/U WT= 120K, INCLUDES 40K TOP DRIVE WT. - FILL WELL- TOOK 4 BBLS. - CENTRALIFT REP DISCONNECT PENETRATOR. TEST ESP CABLE. - L/D TBG HANGER AND LANDING JT. - INSTALL FOSV WITH HEADPIN. - P/U TO LOWER ESP CLAMP, CUT ESP CABLE. - LOWER TO FLOOR. CLOSE ANNULAR. - R/U TO CIRCULATE. 19:30 - 00:00 4.50 PULL P DECOMP REVIEW DDI SOP FOR CIRCULATING THROUGH GAS BUSTER. - OPEN CHOKE, PUMP DOWN TBG 3 BPM 970 PSI WITH 10.6 PPG KWF. - TAKE RETURNS THROUGH CHOKE AND GAS BUSTER. - CBU, MONITOR LOSS RATE- 32 BPH. - SLOW RATE TO 2 BPM 570 PSI. LOSS RATE - 18 BPH. - IN THE LAST 12 HRS WELL TOOK 143 BBLS. - IN THE LAST 24 HRS WELL TOOK 306 BBLS. - O /A= 250 PSI. 6/11/2012 00:00 - 01:00 1.00 PULL P DECOMP CREW CHANGE. - WITH CHOKE OPEN, OPEN ANNULAR. - 6 BBLS TO FILL. - MONITOR WELL, CONTINUES TAKING FLUID. - STATIC LOSS 10 - 11 BPH. - PJSM FOR POH WITH ESP COMPLETION. REVIEW DDI SOP, WITH CENTRALIFT, WSL, TOOL PUSHER AND CREW. - REVIEW WELL PLAN JOB STEPS. - PLAN FOR WELL CONTROL. - CONTINUOUS HOLE FILL WITH TRIP TANK. - MONITOR HOLE FILL. Printed 7/5/2012 9:00:56AM / `' • . ,./ i',. :r ';',"/ ,' • ? / 14' "1" ''*wx i'Wf% ‘e. t /' // ''''/ . r '' ' -' 4 fr,# 41 'YI Ay '' '',; ,;;--i.r// 64, '.t. , %•/;" . '''; , ;; , -'4 4 T 1 .3"if . '•49 4 ;g0."',',e,'*riti-, f:/ y '/, 2 . , / . ./ . // 4,7/ 4"/ A</r ' %,..;,e 6 ' s ' f t ; f,; ; 6"'"', ' I 1 1 4 ,' --;04.; ',.:):..),',' , ,le d 7;iii/yx/#1 1 ''"; e Az" '9,- 7 Common Well Name: MPF -18 AFE No Event Type: WORKOVER (WO) Start Date: 6/6/2012 End Date: X4- 00WCL -E: (1,900,000.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/3/1996 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @42.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:00 - 05:00 4.00 PULL P DECOMP R/D CIRC HOSE. L/D FOSV AND HEAD PIN. - P/U WT= 108K. 5/0 WT= 74K. INCLUDES 40K TOP DRIVE WT. - POH FROM 14,242', STAND BACK 2 STANDS 2 7/8" TBG IN DERRICK . - L/D 1 JT 2 7/8" TBG, FIRST GLM AND 2 PUP JTS. - CENTRALIFT REP SPLICE ESP CABLE TO SPOOL. - POH WITH ESP COMPLETION AND STAND IN DERRICK. - 2 7/8" 6.5#, EUE 8RD TBG. - SPOOLING ESP CABLE. - CONTINUOUS HOLE FILL, LOSS RATE 10 BPH. - KWF 10.6 PPG BRINE. - POH TO 10,100' 05:00 - 12:00 7.00 PULL P DECOMP CONTINUE TO POOH W/ 2 7/8" FSP COMPLETION. - BOP DRILL W/ POOH. RESPONSE TIME 3 MIN 35 SEC. - SIMULATED CUTTING ESP CABLE AND RUNNING SLICK JT ACROSS STACK. - CONTINUE TO POOH. WELL TAKING 10 -11 BBLS / HR. - OOH TO 2842'. 60K UP WT & 60K DOWN WT. - TOTAL LOSSES FOR LAST (12) HRS = 172 BBLS. 12:00 - 12:30 0.50 PULL P DECOMP SERVICE RIG AND INSPECT EQUIPMENT. - PRE JOB ON PULLING ESP COMPLETION. 12:30 - 17:30 5.00 PULL P DECOMP CONTINUE TO POOH W/ 2 7/8" ESP COMPLETION. - CHANGING OUT BAD JTS AS NEEDED. - WELL TAKING 10 - 11 BBLS / HR. -0 /A= 250 PSI. 17:30 - 18:00 0.50 PULL P DECOMP MONITOR WELL PRIOR TO TRIPPING NONSHEARABLES ACROSS BOP. - PJSM. REVIEW PLAN FOR LID ESP PUMP AND MOTOR ASSEMBLY. - REVIEW WELL CONTROL PLAN FOR NONSHEARABLES ACROSS BOP. 18:00 - 21:30 3.50 PULL P DECOMP L/D ESP PUMP AND MOTOR ASSEMBLY. - CENTRALIFT INSPECT PUMP AND MOTOR. - UPPER PUMP HAS TWISTED SHAFT. - NORM TEST PUMP AND MOTOR. - RECOVERED - 230 LASALLE CLAMPS. - 6 PROTECTOLIZERS. - 3 ARMSTER GUARDS. REPLACE 3 BAD JTS 2 7/8" TBG, PINCHED FROM PRIOR M/U. - BOTTOM JT OF STD 124- BAD JT= 31.94', NEW JT= 31.68' - BOTTOM JT OF STD 128- BAD JT= 31.77', NEW JT= 31.77' - BOTTOM JT OF STD 136- BAD JT= 31.60', NEW JT= 31.69' - REPLACE 1 BAD COLLAR ON TOP STD 137. - CONTINUE TO KEEP WELL FULL. Printed 7/5/2012 9:00:56AM %/ I 'V//4": 3 '1 7 4 4 / 1, '', 4V 14. 4‘1 " .0. 1 r<W P/ '* !, Common Well Name: MPF -18 AFE No Event Type: WORKOVER (WO) Start Date: 6/6/2012 End Date: X4- 0OWCL -E: (1,900,000.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/3/1996 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @42.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:30 - 22:30 1.00 PULL P DECOMP CLEAR AND CLEAN RIG FLOOR. - R/D ELEPHANT TRUNK FOR ESP CABLE. 22:30 - 00:00 1.50 EVAL P DECOMP PJSM, REVIEW DDI SOP FOR C/O SAVER SUB ON TOP DRIVE. - C/O SAVER SUB. - MONITOR WELL KEEPING FULL. - LOSSES TO WELL IN LAST 12 HRS= 152 BBLS. - LOSSES TO WELL IN LAST 24 HRS= 324 BBLS. - STATIC LOSS RATE 10 -11 BPH. - O /A= 215 PSI. 6/12/2012 00:00 - 01:00 1.00 EVAL P DECOMP M/U RUNNING TOOL. INSTALL WEAR RING- RI 4LDS. 01:00 - 04:30 3.50 EVAL P DECOMP PJSM, M/U HES 7" CHAMP PACKER. - DRIFT AND P/U 4" DRILL PIPE FROM PIPE SHED, RIH 1652' - USE CAUTION SETTING SLIPS AND NOT TO TURN PIPE. - TRIP AT MODERATE SPEED TO AVOID SURGING WELL. - USE CONTINUOUS HOLE FILL. 04:30 - 09:00 4.50 EVAL N RREP DECOMP REPAIR RIG. PIPE SKATE. - HYDRAULIC HOSE JUMPED THE HOSE REEL. - JOB STOPPED. CONTINUOUS HOLE FILL. - REPLACE HYDRAULIC HOSE AND HOSE REEL. - AAR WITH CREW. 09:00 - 09:30 0.50 EVAL P DECOMP CONTINUE TO PICK UP SINGLES FROM PIPE SHED. - RIH W/ CHAMP PACKER ON 4" DP. 09:30 - 11:00 1.50 EVAL N RREP DECOMP RIG REPAIRS: CHANGE OUT PIPE SKATE ROLLER MOTOR. - AAR ON REPAIR WORK 11:00 - 12:00 1.00 EVAL P DECOMP CONTINUE TO PICK UP SINGLES FROM PIPE SHED. - RIH W/ CHAMP PACKER ON 4" DP TO 2824' - LOSSES TO WELL LAST 12 FIRS = 135 BBLS OF 10.6 PPG BRINE. 12:00 - 13:00 1.00 EVAL P DECOMP SERVICE RIG AND INSPECT EQUIPMENT. - INSPECT TOP DRIVE. PJSM. 13:00 - 18:00 5.00 EVAL P DECOMP CONTINUE TO PICK UP SINGLES FROM PIPE SHED. - RIH W/ CHAMP PACKER ON 4" DP F/2824' T/5825 - 185 JTS IN HOLE @ 16:30. 103K UP WT, 85K DOWN WT. - ALL UP AND DOWN WTS INCLUDE TOP DRIVE (40K). 18:00 - 00:00 6.00 EVAL P DECOMP PICK UP DRILL PIPE 1X1 - RIH W/ CHAMP PACKER F/5825 T/12333 - PUWT = 160K, SOWT = 95K, INCLUDES TOP DRIVE WT - OA = 230 PSI - TOTAL 24 HOUR FLUID LOSS = 247 BBLS Printed 7/5/2012 9:00:56AM P l n g yr y3i � a /,., l" r ° //� i l s/ / � / y � ter, ,; /G: Common Well Name: MPF -18 AFE No Event Type: WORKOVER (WO) Start Date: 6/6/2012 End Date: X4- O0WCL -E: (1,900,000.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/3/1996 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @42.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 6/13/2012 00:00 - 02:00 2.00 EVAL P DECOMP PJSM, PERFORM SPCC CHECKS AND INSPECT EQUIP - CONTINUE PICK UP DP 1X1 - RIH WITH CHAMP PACKER F/12333' T/13400 - PUWT = 175K, SOWT = 103K 02:00 - 02:30 0.50 EVAL P DECOMP PJSM ON SETTING CHAMP PACKER AND R/U AND TEST CASING BREAK CIRCULATION WHILE RECIPROCATING PIPE - 5 BPM = 710 PSI, 250 STROKES - POSITION CENTER OF ELEMENT AT 13400' ON UP STROKE - TURN PIPE TO THE RIGHT TO SET PACKER - SET CHAMP PACKER WITH 20K DOWN WEIGHT 02:30 - 04:00 1.50 EVAL P DECOMP PERFORM MIT -IA CASING TEST - R/U TEST EQUIPMENT, PURGE LINES, CLOSE PIPE RAMS - TEST CASING TO 3500 PSI, 30 MIN. `C61 CHARTED = GOOD TEST - MONITORED "OA" PRESSURES = GOOD - RECEIVE VERBAL CONFIRMATION WITH WELLS TEAM LEAD TO PROCEED - BLEED OFF ALL PRESSURES AND RELEASE PACKER - MONITOR WELL FOR 10 MINUTES - FLUID IS SLOWLY DROPPING IN STACK - R/D TEST EQUIPMENT AND BLOW DOWN LINES 04:00 - 12:00 8.00 EVAL P DECOMP PJSM ON LAYING DOWN DRILL PIPE, RELATED HAZARDS, NEW PEOPLE IN NEW POSITIONS, AND MAINTAINING GOOD COMMUNICATION - POOH AND LAY DOWN DRILL PIPE F/13400' - ENSURE CONTINUOUS HOLE FILL WHILE POOH - POOH TO 7309'. 12K UP WT, 90K DOWN WT. - ALL WEIGHT CHECKS INCLUDE TOP DRIVE, (40K). - LOST 113 BBLS OF 10.6 PPG BRINE LAST (12) HOURS. 12:00 - 13:00 1.00 EVAL P DECOMP SERVICE RIG, INSPECT EQUIPMENT. - ENSURE GOOD CHANGE OUT WITH RELIEF - DISCUSS ANY SPECIFIC HAZARDS - PERFORM SPCC CHECKS 13:00 - 19:00 6.00 EVAL P DECOMP PJSM. CONTINUE TO POOH W/ 4" DP. - POOH W/ HES CHAMP PACKER ON 4" DP F/7309 T /SURFACE - WELL TAKING 10 - 12 BPH W/ POOH. 19:00 - 20:00 1.00 EVAL P DECOMP LAY DOWN CHAMP PACKER - CLEAR RIG FLOOR OF SERVICE TOOLS - P/U RUNNING TOOL AND ENGAGE WEAR BUSHING - BO /LDS, PULL WEAR BUSHING AND UD SAME 20:00 - 21:00 1.00 RUNCOM P RUNCMP PJSM ON R/U CENTRILIFT - LOAD CENRILIFT BHA INTO PIPE SHED - MOBILIZE CLAMPS AND CENTRILIFT EQUIP TO RIG FLOOR - STING ROPE THRU SHEAVE FOR ESP CABLE Printed 7/5/2012 9:00:56AM '/7*- Ye • /•• 10; '0"li,.//‹./ • ve. •/' rW A :r/41 ; ',1-%7VIA rWz ,� s j i Common Well Name: MPF -18 AFE No Event Type: WORKOVER (WO) Start Date: 6/6/2012 End Date: X4- 00WCL -E: (1,900,000.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/3/1996 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @42.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:00 - 00:00 3.00 RUNCOM P RUNCMP PJSM, P/U ESP PUMP ASSY - M/U MPS-1 MOTOR AND PUMP ASSEMBLY PER CENTRILIFT REP AND WELL PLAN - ATTACH ESP CABLE AND TEST SAME - INSTALL 4 PROTECTOLIZER CLAMPS ON PUMP / MOTOR ASSY - INSTALL 2 ARMSTER GUARDS - INSTALL CANNON CLAMPS ON FIRST 9 COLLARS - M/U 10' PUP AND 1 JOINT 2 7/8" EUE 8RD - OA= 250PSI - TOTAL 24 HOUR FLUID LOSS = 244 BBLS 6/14/2012 00:00 - 06:00 6.00 RUNCOM P RUNCMP PJSM, RUNNING ESP COMPLETION - RIH W/ 2 7/8 "' 6.5# EUE 8RD ESP COMPLETION - INSTALL CANNON CLAMPS ON FIRST 9 COLLARS - INSTALL CANNON CLAMPS EVERY OTHER JOINT TO SURFACE - INITIAL BREAK CIRCULATION AT 1000' AND CHECK CONDUCTIVITY - 1/2 BPM = 350 PSI, GOOD CONDUCTIVITY - TEST ESP CABLE CONDUCTIVITY AND BREAK CIRCULATION EVERY 2000' - ENSURE CONTINUOUS HOLE FILL WHILE RIH - 05:00 AM DEPTH 1650' 06:00 - 12:00 6.00 RUNCOM P RUNCMP RIH W/ 2 7/8 "' 6.5# EUE 8RD ESP COMPLETION - INSTALL CANNON CLAMPS EVERY OTHER JOINT TO SURFACE - BREAK CIRCULATION EVERY 2000' AND CHECK CONDUCTIVITY - REPLACE DAMAGED (EGGED) JTS AS NEEDED. - ENSURE CONTINUOUS HOLE FILL WHILE RIH - 12:00 DEPTH —5862' UP WT = 72K, DOWN WT = 62K. - ALL WEIGHT CHECKS INCLUDE TOP DRIVE (40K). TOTAL LOSSES FOR LAST (12) HRS = 125 BBLS OF 10.6 PPG BRINE. - O/A = 250 PSI. 12:00 - 12:30 0.50 RUNCOM P RUNCMP SERVICE RIG, INSPECT EQUIPMENT. - ENSURE GOOD CHANGE OUT WITH RELIEF Printed 7/5/2012 9:00:56AM / w-` 1 iii /%/ Common Well Name: MPF -18 AFE No Event Type: WORKOVER (WO) Start Date: 6/6/2012 End Date: X4- 00WCL -E: (1,900,000.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/3/1996 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @42.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:30 - 16:00 3.50 RUNCOM P RUNCMP -RIH W/ 2 7/8 "' 6.5# EUE 8RD ESP COMPLETION - INSTALL CANNON CLAMPS EVERY OTHER JOINT TO SURFACE - BREAK CIRCULATION EVERY 2000' AND CHECK CONDUCTIVITY - 1/2 BPM @ 350 PSI. - REPLACE DAMAGED (EGGED) JTS AS NEEDED. - ENSURE CONTINUOUS HOLE FILL WHILE RIH - ALL WEIGHT CHECKS INCLUDE TOP DRIVE (40K). - TOTAL LOSSES FOR LAST (12) HRS = BBLS OF 10.6 PPG BRINE. - O/A = 250 PSI. 16:00 - 20:30 4.50 RUNCOM P RUNCMP PJSM. CHANGE OUT ESP CABLE REELS, MAKE SPLICE. - 81 STANDS IN THE HOLE @ 7825'. - CHECK CONDUCIVITY = GOOD 20:30 - RUNCOM P RUNCMP CONTINUE RIH W/ 2 7/8" 6.5# EUE 8RD ESP COMPLETION - RIH F/7825' T/10581' - MAINTAIN CONTINUOUS HOLE FILL WHILE RIH - OA= 240PSI - TOTAL 24 HOUR FLUID LOSS = 244 BBLS 6/15/2012 00:00 - 00:30 0.50 RUNCOM P RUNCMP SERVICE RIG, INSPECT EQUIPMENT. - ENSURE GOOD CHANGE OUT WITH RELIEF 00:30 - 06:30 6.00 RUNCOM P RUNCMP PJSM, CONTINUE RIH W/ 2 7/8 "' 6.5# EUE 8RD ESP COMPLETION - RIH F/10581' T/14220' - INSTALL CANNON CLAMPS EVERY OTHER JOINT TO SURFACE - BREAK CIRCULATION EVERY 2000' AND CHECK CONDUCTIVITY - 1/2 BPM @ 370 PSI, at — 14150' - REPLACE DAMAGED (EGGED) JTS AS NEEDED. - MAINTAIN CONTINUOUS HOLE FILL WHILE RIH - UP WT = 110K, DOWN WT = 75K. TOP DRIVE = 40K. - M/U TBG HANGER AND LANDING JT W/ SAFETY VALVE. 06:30 - 08:00 1.50 RUNCOM P RUNCMP PJSM. - TERMINATE ESP TO HANGER & TEST, CONDUCTIVITY, OK. 08:00 - 08:30 0.50 RUNCOM P RUNCMP PJSM, LAND TBG HANGER. - FINAL DEPTH OF CENTRALIZER = 14,258.87' 08:30 09:00 0.50 RUNCOM P RUNCMP PJSM. RILDS. - LAY DOWN LANDING JT. 09:00 - 10:30 1.50 RUNCOM P RUNCMP PJSM. DRY ROD IN TWO WAY CHECK VALVE, (WELL ON VACUUM). - PRESSURE TEST TWO WAY CHECK VALVE. - PERFORM ROLLING TEST BELOW, PUMP 3 BPM/ 500 PSI, 10 MIN. - TEST FROM THE TOP, 250 / 3500 PSI, 5 MIN EA, CHARTED, OK. Printed 7/5/2012 9:00:56AM • /ilk 7 P' !u c 3 , ;,, .,.�. /, .; , oy , �, .... E • Common Well Name: MPF -18 AFE No Event Type: WORKOVER (WO) Start Date: 6/6/2012 End Date: X4- 00WCL -E: (1,900,000.00 ) Project: Milne Point Site: M Pt F Pad Rig Name /No.: DOYON 16 Spud Date/Time: 6/3/1996 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Kelly Bushing / Rotary Table @42.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:30 - 13:30 3.00 BOPSUR P RUNCMP PJSM. N/D BOPE, - BLOW DOWN CHOKE AND KILL LINES. - SUCK OUT STACK AND N/D BOPE AND ADAPTER. - 155 BLS OF 10.6 PPG BRINE LOST TO WELL LAST (12) HOURS. - RAN (231) CANNON CLAMPS, (4) PROTECTROLIZERS AND (2) ARMSTAR GUARDS. 13:30 - 15:00 1.50 WHSUR P RUNCMP PJSM. CENTRILIFT PERFORM FINAL CHECK ON ESP CABLE, OK. .PIIPPI E ,LIP ADAPTER FLANGF AND TRFF 15:00 - 17:30 2.50 WHSUR P RUNCMP PJSM. FMC PERFORM PRESSURE TESTS. - TEST ADAPTER FLANGE, 250 / 5000 PSI, 5 MIN / CHARTED. - TEST TREE W/ DIESEL, 250 / 5000 PSI, 5 MIN / CHARTED, GOOD TESTS. 17:30 - 19:30 2.00 WHSUR P RUNCMP PJSM, M/U WELL SUPPORT LUBRICATOR - TEST LUBRICATOR, 250 PSI, 3500 PSI, 5 MIN, CHARTED - PULL TWC 19:30 - 21:30 2.00 WHSUR P RUNCMP M/U LUBRICATOR - TEST LUBRICATOR, 250 PSI, 3500 PSI, 5 MIN, CHARTED - INSTALL BPV - PERFORM ROLLING TEST FROM BELOW - 3 BPM = 500 PSI, 10 MIN, CHARTED - R/D WELL SUPPORT LUBRICATOR - PERFORM FINAL PHASE / PHASE / GROUND TEST ON ESP CABLE = GOOD - BHP = 3883 PSI - BHT = 160 DEGREES 21:30 - 00:00 2.50 RIGD P RUNCMP BLOW DOWN ALL LINES - SECURE TREE AND WELLHEAD - PREP CELLAR AREA FOR RIG MOVE - CLEAN / EMPTY PITS - PREP RIG FOR RIG MOVE - FUNCTION TEST MOVING SYSTEM AND E -STOPS - TOTAL 24 HOUR FLUID LOSS = 304 BBLS - RELEASE RIG AT 24:00 HOURS Printed 7/5/2012 9:00:55AM Tree: 2 9/16" 5M FMC • MPU F -18 Wellhead: 11" 5M FMC 1 KB Elev. = 40.65 (N 22E) w/ 2 7/8" WKM Tubing Hanger , w/ Orig. GL Elev. = 12.40' 3" LH Acme thrds. 2.5" CIW H RT To Tbg. Spool = 28.6' (N 22E) BPV profile 1 r 115' f 20" 91.1 ppf, H -40 Camco Sidepocket I 175' KOP @ 600' KBMG -M -2 GLM Max. hole angle = 67 to 71 deg. f/ 2 -7/8" x 1" 3700 to 13300' Hole angle thru' perfs = 45 deg No DLS = 3 deg. /100' 9 5/8 ", 40 # /ft, L -80 7914' I ■ Btrc. 7" 26 ppf, L-80, NSCC production casing Camco Sidepocket ( drift ID = 6.151", cap. = 0.0383 bpf) KBMG M 2 GLM 1 13983' IP 2-7/8" x 1" 2 7/8" 6.5 ppf, L -80, 8 rd EUE tbg.. HES 2 -7/8" "XN" 1 14136' ( drift ID = 2.347 ", cap. = 0.00592 bpf) Nipple (2.250 No -go) GPDIS Discharge Head 1 141185' Pump - PMSXD 119 P23 14186' r � Pump - PMSXD 18 P75 ( 14203' ; `., -- Tandem Gas Separator, I 14210' • Model GSTHV Gasmaster Tandem Seal Section GSB3 DB UT SB /SB PFSA 14215' I/ GSB3 DB LT SB /SB PFSA Stimulation Summary , MotorMSP1 336 hp 2650 volt / 77 amp RE -Rated To 240 hp 2455 volt / 59 amp 14230' 06/21/96- 154.1 Mlb 16/20 mir Carbolite behine Pipe. Job went Flush I ID PumpMate XTO w/6 Fin 14254' Centralizer Perforation Summary Ref log: 06/18/96 GR/CCL 7" short joint from 14196' to 14236' wlm w/ Size SPF Interval (TVD) radioactive marker at 14196' wlm. A- Sand 3 3/8 6 14434'- 14470' (7178'- 7204') 3 3/8 6 14482'- 14522' (7212'- 7241') A Fish in hole - 6 Fin 22 j Jumbo Jet charges, (EHD= 0.76" r Centralizer pushed to 14,522`. TTP =6.4" @ 135/45 Deg Phaseing and ; Random Orientation mid -perf = 7209' tvd 41 , 7" float collar 114834' MD 1 14478' and (PBTD) 1 14915' MD 1 7" float shoe DATE REV. BY COMMENTS MILNE POINT UNIT 07/06/96 MDO CTU Cleanout 07/19/96 DLH ESP Completion WELL F -18 07/08/01 GMH Nabors 4ES ESP RWO API NO: 50 -029 -22681 06/06/04 JRC Doyon 14 ESP RWO 7 -17 -08 REH Nabors 3S ESP RWO 06/17/12 Brian Bixby Doyon 16 ESP RWO BP EXPLORATION (AK) • • by BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 ()FEB 1 7 21)12 December 30, 2011 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 0 - /00 333 West 7 Avenue 1, "' Anchorage, Alaska 99501 \ Subject: Corrosion Inhibitor Treatments of MPF -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPF -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator III S BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) MPF -Pad 10/29/2011 Corrosion Initial top of Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement Vol. of cement pumped cement date inhibitor sealant date ft bbls ft gal MPF -01 1950450 50029225520000 10.2 N/A 10.2 N/A 122.4 8/7/2011 MPF -02 1960700 50029226730000 4 N/A 4 N/A 35.7 8/8/2011 MPF-05 1970740 50029227620000 1.3 N/A 1.3 N/A 13.6 8/9/2011 MPF-06 1960020 50029226390000 1.2 N/A 1.2 N/A 15.3 8/2/2011 MPF-09 1971040 50029227730000 5.0 N/A 5.0 N/A 54.4 8/9/2011 MPF -10 1960940 50029226790000 1.7 N/A 1.7 N/A 20.4 8/2/2011 MPF -13 1950270 50029225490000 0.2 N/A 0.2 N/A 8.5 10/6/2011 MPF -14 1952120 50029226360000 0.1 N/A 0.1 N/A 8.5 10/6/2011 MPF -17 1971960 50029228230000 4.1 N/A 4.1 N/A 37.4 8/6/2011 ""°9 MPF -18 1961000 50029226810000 8.3 N/A 8.3 N/A 91.8 8/2/2011 MPF -21 1961350 50029226940000 1.8 N/A 1.8 N/A 15.3 8/6/2011 MPF -22 1952010 50029226320000 4 N/A 4 N/A 13.6 8/1/2011 MPF -25 1950160 50029225460000 0.3 N/A 0.3 N/A 6.8 10/29/2011 MPF -26 1970840 50029227870000 1.8 WA 1.8 N/A 11.9 8/1/2011 MPF -29 1961170 50029226880000 6.7 N/A 6.7 N/A 56.1 8/9/2011 MPF -30 1951840 50029226230000 0.8 N/A 0.8 N/A 6.8 8/1/2011 MPF -33 2010620 50029226890000 23 Need top job MPF-34 1971970 50029228240000 4.1 WA 4.1 N/A 13.6 8/1/2011 MPF-37 1950250 50029225480000 0.2 N/A 0.2 N/A 8.5 10/6/2011 MPF-38 1951680 50029226140000 0.3 N/A 0.3 N/A 6.8 10/5/2011 MPF-41 1970950 50029227700000 0.8 N/A 0.8 N/A 8.5 8/9/2011 MPF-42 1970200 50029227410000 1.8 N/A 1.8 N/A 13.6 8/1/2011 MPF-45 1950580 50029225560000 8 N/A 8 N/A 78.2 8/11/2011 MPF-46 1940270 50029224500000 Sealed Conductor N/A N/A N/A N/A N/A MPF-49 1970030 50029227320000 2.3 N/A 2.3 N/A 18.7 8/11/2011 MPF -50 1970580 50029227560000 1.7 N/A 1.7 N/A 6.8 7/31/2011 MPF -53 1951080 50029225780000 2.8 N/A 2.8 N/A 11.9 9/19/2011 MPF-54 1961920 50029227260000 1.7 N/A 1.7 N/A 10.2 8/1/2011 MPF-57A 2031670 50029227470100 1.3 N/A 1.3 N/A 13.6 8/112011 MPF -58 1961560 50029227060000 1.7 N/A 1.7 N/A 13.6 7/31/2011 MPF-61 1951170 50029225820000 62 Need top job MPF-62 1951610 50029226090000 2.0 NN 2.0 N/A 13.6 9/1/2011 MPF-65 1970490 50029227520000 1.5 N/A 1.5 N/A 13.6 8/112011 MPF -66A 1961620 50029226970100 0.8 N/A 0.8 N/A 8.5 7/31/2011 MPF-69 1951250 50029225860000 0.8 N/A 0.8 N/A 8.5 8/4/2011 MPF -70 1951530 50029226030000 1.7 N/A 1.7 N/A 15.3 7/312011 MPF -73A 2001980 50029227440100 1.5 N/A 1.5 N/A 13.6 8/11/2011 MPF -74 1961080 50029226820000 1.7 N/A 1.7 N/A 13.6 7/31/2011 MPF -77 1951360 50029225940000 0.2 N/A 0.2 N/A 6.8 10/5/2011 MPF -78 1951440 50029225990000 0.7 N/A 0.7 N/A 5.1 7/31/2011 MPF-79 1971800 50029228130000 0.6 N/A 0.6 N/A 6.8 8/3/2011 MPF-80 1982170 50029229280000 0.5 N/A 0.5 N/A 3.4 8/3/2011 MPF-81 2000660 50029229590000 0.9 N/A 0.9 N/A 8.5 8/3/2011 MPF-82 2091350 50029229710000 1.7 N/A 1.7 N/A 15.3 8/3/2011 MPF -83 2000930 50029229630000 1.2 N/A 1.2 N/A 13.6 8/3/2011 MPF -848 2001760 50029229310200 1.2 N/A 1.2 N/A 10.2 8/3/2011 MPF-85 1982500 50029229360000 0.1 N/A 0.1 N/A 7.7 9/1/2011 MPF -86 2010870 50029230180000 0.8 N/A 0.8 N/A 6.8 8/12/2011 MPF -87A 2032130 50029231840100 1.3 N/A 1.3 N/A 11.9 8/13/2011 MPF-88 2031930 50029231850000 1.3 N/A 1.3 N/A 15.3 8/3/2011 MPF -89 2050900 50029232680000 1.2 N/A 1.2 N/A 10.2 8/3/2011 MPF-90 2012110 50029230510000 1.8 N/A 1.8 N/A 18.7 8/3/2011 MPF -91 2051100 50029232710000 1.7 N/A 1.7 N/A 11.9 8/13/2011 MPF -92 1981930 50029229240000 0.8 N/A 0.8 N/A 5.1 8/13/2011 MPF -93 2050870 50029232660000 0.3 N/A 0.3 N/A 7.7 9/1/2011 MPF-94 2011700 50029230400000 1.8 N/A 1.8 N/A 13.6 8/13/2011 MPF -95 1981790 50029229180000 0.5 N/A 0.5 N/A 3.4 8/132011 MPF -96 2081860 50029234060000 0.1 N/A 0.1 N/A 6.0 9/1/2011 MPF -99 2061560 50029233320000 1.3 N/A 1.3 N/A 11.9 8/11/2011 __3 ~~.~. STATE OF ALASKA • ~~' A~ OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS -, _ aP X nM' £~ n ~0~,~ 1. Operations Performed: ^ Abandon ®Repair Well ~ ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended lPyiell ^ Alter Casing ®Pull Tubing - ^ Perforate New Pool ^ Waiver ®Other ^ Change Approved Program ^ Operation Shutdown Change out ESP- ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ®Development ^ Exploratory 196-100 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22681-00-00- 7. KB Elevation (ft): KBE = 40.65' ~ 9• Well Name and Number: MPF-18 8. Property Designation: 10. Field /Pool(s): ADL 355018. Milne Point Unit / Kuparuk River Sands 11. Present well condition summary Total depth: measured 14941 - feet true vertical 7530 - feet Plugs (measured) None Effective depth: measured 14834 feet Junk (measured) Fish at 14522' true vertical 7456 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 112' „_, „11~;~~,_. • _.., 1490 470 Surface 7883' 9-5/8" 7914' 4529' 5750 3090 Intermediate Production 14886' 7" 14915' 7512' 7240 5410 Liner e~~~~~IV~~ SF~ ~ 200 Perforation Depth MD (ft): 14434' - 14522' Perforation Depth TVD (ft): 7178' - 7241' 2-7/8" 6.5#, L-80 14247' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): N/A 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final p ressure: 13. Re resentative Dail Avera a Production or In•ection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: Subsequent to operation: 14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work: ^ Exploratory ®Development ^ Service ® Daily Report of Well Operations 16. Well Status after work: ® Well Schematic Diagram ®Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Howard West, 564-5471 N/A Printed Name Sondra Stewman Title Drilling Technologist ` Si - -- Prepared By Name/Number: --Phone 564-4750 !Date QCT l u ~~ondra Stewman, 564-4750 Form 10-404 Revised 04/2006 ' Submit Original O ly R I G P N A L ~ F~ CEP ~ l ~ooB ,~ ~ ~~~ Tree: 2 9/16" - 5M FMC • Wellhead: 11" 5M FMC w/ 2 7/8" WKM Tubing Hanger , w/ 3" LH Acme thrds. 2.5" CIW H B'PV profile 115' 20" 91.1 ppf, H-40 KOP @ 600' Max. hole angle = 67 to 71 deg. f/ 3700 to 13300' Hole angle thru' perfs = 45 deg No DLS = 3 deg./100' 9 5/8", 40#!ft, i-80 7914' Btrc. 7" 26 ppf, L-80, NSCC production casir ( drift ID = 6.151 ", cap. = 0.0383 bpf ) 2 7/8" 6.5 ppf, L-80, 8 rd EUE tbg.. (drift ID = 2.347", cap. = 0.00592 bpf ) Stimulation Summary 06/21/96- 154.1 Mlb 16/20 Carbolite behine Pipe. Job went Flush Perforation Summary Ref-loge 06/18/96 GR/CCL Size SPF Interval (TV A-Sand 3 3/8 6 14434'-14470' (7178'-7 3 3/8 6 14482'-14522' (7212'-7 22 j Jumbo Jet charges, (EHD=0.76" TTP=6.4" @ 135/45 Deg Phaseing an Random Orientation mid-perf = 7209' tvd 14478' and 07/08/01 GMH Nabors 4ES ESP RWO 06/06/04 JRC Doyon 14 ESP RWO 7-17-08 REH Nabors 3S ESP RWO Orig. KB Elev. = 40.65 (N 22E) Orig. GL Elev. = 12.40' RT To Tbg. Spool = 28.6' (N 22E) Cameo Sidepocket 172' KBMG-M-2 GLM 2-7/8" x 1" Cameo Sidepocket 13985' KBMG-M-2 GLM 2-7/8" x 1 " HES 2-7/8" "XN" 14128' Nipple (2.25 No-go) rp - 137-P17 coated stgs. 14177' rp - 18-P75 coated stgs. 14196` dem Gas Separator, 14203` lel GRSTXBARH6 dem Seal Section 14208` for KMH G 228hp )5 volt / 60 amp 14222, npMate XTO w/6 Fin 14242` I ~tralizer rt joint from 14196' to 14236' wlm w/ ~tive marker at 14196' wlm. Fish in hole - 6 Fin Centralizer pushed to 14,522`. 'float collar ~r'BTD) 7" float shoe 14 ' MD 14 1 ' M MILNE POLNT UNIT WELL F-18 AP'i NO: 50-029-22681 BP EXPLORATION MPU F-18 MPF-18 Well History Date Summary 7/1/2008 T/I/0=250/400/40 Freeze Protect (Pre-RWO) -Pumped tbg w/15 bbls diesel. Flush/freeze protect production lateral w/2 bbls 60/40 methanol, 3 bbls diesel & 2 bbls 60/40 methanol. Flush/freeze protect test lateral w/2 bbls 60/40 methanol, 3 bbls diesel & 2 bbls 60/40 methanol. Closed & flagged lateral valves & bled flow line & test line to 0 psi. Wing, swab, SSV & choke closed & flagged. Master & casing valves open. Tag well & notify operator. Final WHP's=400/400/40 7/3/2008 PULLED BEK- DPSOV FROM 180' MD 7/4/2008 The Well Support Techs rigged up and removed the wellhouse, flowlines and the foundation. No back pressure valve was install due to the fact they need to do a static on the well. NOTE: A BPV will need set after the static is completed. Pulled BK-DGLV from STA# 1 ~ 13992' MD (STA Left Empty), Set BK-DGLV in STA# 2 ~ 180' MD 7/9/2008 RAN MPU GAUGES TO 13634' MD & 14186' MD 7/11/2008 The Wel! Support Techs rigged up and set a back pressure valve. NOTE: The BPV was left IN!!!!! 7/15/2008 SET DGLV IN GLM # 1 AND DPSOV IN GLM #2 IN PIPE SHED. BOTH MANDRELS MARKED AND DPSOV FLAGGED. 7/18/2008 T/I/0=0/0/20. Freeze protect IA w/ 65 bbls crude after RWO. Freeze protect tbg w/ 15 bbls crude. FW H P=200/300/20. 8/4/2008 The Well Support Techs rigged up and pulled the back pressure valves.. They then rigged up and leak tested the flowlines to 1150 psi. NOTE: The BPV was left OUT and the leak test was GOOD!!!!! ~ ~ BP EXPLORATION Page 1 of 3 Operations Summary Report Legal Well Name: MPF-18 Common Well Name: MPF-18 Spud Date: 6/3/1996 Event Name: WORKOVER Start: 7/11/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 7/17/2008 Rig Name: NABORS 3S Rig Number: Date i From - To Hours Task Code NPT Phase Description of Operations 7/12/2008 20:00 - 00:00 4.00 CONS P PRE Welder installed guard around skate on rig floor. Weld cracks in drip pans on sub. Fixed welds near hydromatic and reel. 7/13/2008 00:00 - 02:00 2.00 RIGD P PRE Scope in & L/D derrick. Disconnect shed & pits from carrier. Jack down rig and disconnect power cords. Connect Peak trucks to modules and prepare to move off well. 02:00 - 04:00 2.00 MOB P PRE Notify Milne Point Radio of moving the Rig. Mobilize the Rig and all Modules from F-01 to F-18. Lay herculite over matting boards, Place BOPE & DSA behind well. Spot rig over well with Pad-Op Craig Henry as witness. 04:00 - 06:00 2.00 RIGU P PRE Spot pits & Pipe shed. Connect power cords. Place berming w/ herculite. Connect Tiger Tank to Sub w/ hardline. Prep & clean rig. 06:00 - 09:00 3.00 RIGU P PRE Continue hooking up rig components. Raise and scope Derrick. Riq accepted ~ 09:00. 09:00 - 10:00 1.00 RIGU P PRE Rig up for circulation kill. Hook up hardline and valuing to tree. 10:00 - 11:00 1.00 WHSUR P DECOMP Wells support tech grease IA valve (leaking prior to installation of second valve).:.. PUMU lubricator test to 1000 nsi. Pull BPV. WHP's: 750 / 720 / 40 psi -Tbg / IA / OA. 11:00 - 17:00 6.00 KILL P DECOMP PJSM. Bleed gas from IA to Tiger Tank. Bleed from 750 psi to 450 psi on Tbg and IA. Pump SW ~ 3 BPM, 1000 psi on Tbg, holding 400 psi an IA. Circulate tubing vol (81 Bbls), close choke and bullhead 20 Bbls of SW ~ 3 BPM, 1100 psi. Open choke and circulate 290 Bbls of SW ~ 960 psi on Tbg / 420 psi on IA. Fuil returns to tiger tank. Swap to pumping 9.1 #/gal brine (~ 4 BPM, 1340 psi -Tbg / 350 psi trapped on IA. Circulate 80 Bls, close choke and bullhead 30 Bbls of 9.1 into formation ~ 1390 psi. Open choke and circulate 600 Bbls of brine until 9.1 #/gal in and out. No losses to formation. Shut down. SITP of 140 psi. 17:00 - 21:00 4.00 KILL P DECOMP SITP of 140 si =BHP of 3552 psi. Load salt in pits, call for mud engineer. Calculate mud wt of 9.8 #/gal for 125 osi overbalance. Blgw down lines to Tiger tank. Haul returns. Start to weight up pits from 9.1 #/gal to 9.8 #/gal. 21:00 - 23:00 2.00 KILL P DECOMP Initial TBG = 50 psi, IA = 40 psi. Circulate from Pill pit 8lbbls (TBG volume) of 9.8 ppg ~ 2 BPM / 300 psi taking returns to pit #1. Close choke and bullhead 30 bbls into formation ~ 3 BPM / 840 psi. Shut in choke: TBG = 0 psi, IA = 90 psi. Weight up pit system to 9.8 ppg prior to circulating. 23:00 - 00:00 1.00 KILL P DECOMP Break circulation'. the long way w/ 9.8 ppg ~ 3 BPM / 790 psi from pill pit, taking returns thru choke to pit #1. Pumped 183 bbls ~ 24:00 hrs. Shut down and close in: TBG = 0 psi, IA = 0 psi. Weight up pit system to 9.8 ppg. 7/14/2008 00:00 - 01:30 1.50 KILL P DECOMP Continue to weight up pit system to 9.8 ppg. Circulate w/ gun lines & agitator. 9.8 ppg thru pit #1, #2 to ship to pill pit for circulation. 01:30 - 02:30 1.00 KILL P DECOMP Break circulation from Pill pit ~ 3 BPM / 760 psi w/ 9.8 ppg, taking returns thru choke to pit #1. Circulate 189 bbls. Shut down pump and monitor. Tubing & IA on vacuum. Call Wells Support for fluid shot. 02:30 - 03:30 1.00 KILL P DECOMP Repeat process of weight up pits #1, #2 to 9.8 ppg. Shoot fluid level w/Wells Support Tech. Fluid level in IA ~ 85'.~on vacuum. 03:30 - 05:00 1.50 KILL P DECOMP Break circulation from Pill pit (~ 3 BPM / 800 psi w/ 9.8 ppg, Printed: 7/23/2008 2:31:27 PM • BP EXPLORATION Operations Summary Report Legal Well Name: MPF-18 Common Well Name: MPF-18 Event Name: WORKOVER Start: 7/11/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 7/17/2008 Rig Name: NABORS 3S Rig Number: Date I From - To I Hours I Task I Code I NPT I Phase Page 2 of 3 Spud Date: 6/3/1996 End: Description of Operations 7/14/2008 03:30 - 05:00 1.50 KILL P DECOMP taking returns thr•u choke to pit #1. IA showing no pressure while circulating. Circulating 9.8 ppg in, getting 9.8 ppg out. Shut in and monitor for 20 min. Tubing & IA on vacuum. Total circulation = 581 tibbls. Total losses while circulating = 101 bbls. Added 896 total sax of NaCI. Blow down lines from well to pits. 05:00 - 06:00 1.00 WHSUR P DECOMP PJSM. Pull tree cap. Dry rod TWC w/ FMC Tech. Test TWC from above to 3500 psi and chart. R/U lines to IA for hole fill. 06:00 - 08:30 2.50 WHSUR P DECOMP Crew Change. ND tree. Inspect hanger threads (3" LH Acme). Screw XO into hanger with 7 turns. 08:30 - 13:00 4.50 WHSUR P DECOMP NU DSA. PU BOPE from cradle. NU BOPE. Function test all components. Fill stack. 13:00 - 17:00 4.00 WHSUR P DECOMP Jeff Jones with AOGCC waived State's right of witness testing. Test to 250 / 3500 psi with 2-7/8" test joint. 17:00 - 18:00 1.00 PULL P DECOMP Clean and clear rig floor. PUMU Opso-Lopso. 18:00 - 20:00 2.00 PULL P DECOMP R/U lubricator to Opso-Lopso. P!f lubricator to 500 psi. Pull TWC. Tubing & IA both on vacuum. UD lubricator & Opso-Lopso. PUMU landing joint & XO. 20:00 - 00:00 4.00 RIGU N HMAN PRE Not centered over hole with blocks. Pull pitcher nipple and disconnect flowline. Scope in & UD derrick. Prep pipe shed & pits for jacking sub. Jack and position derrick over hole. P/U derrick and scope up mast. Blocks centered over hole 23:30. R/U flowline & pitcher nipple. Maintain constant hole fill thru operation. 7/15/2008 00:00 - 01:00 1.00 RIGU N HMAN PRE Continue connecting flowline & pitcher nipple. PUMU landing jt & XO. 01:00 - 03:00 2.00 PULL P DECOMP Screw into Tubing Hanger w/ landing jt. Spot 2 bbls of brine on top of Hanger. Pull Hanger free w/ 85K, fluid fell. Tubing & IA on vacuum. Fill hole w/ 14.5 bbls. Space out Hanger across stack for annular preventer. R/U circulating head and circulate 80 bbls (tubing volume) ~ 2.5 BPM / 600 psi, lost 10 bbls Burin ci I .Pull Hanger to floor, disconnect ESP cable from penetrator head. UD Hanger & landing jt. Losses ~ 14 bbls/hr. PUW = ~5K, SOW = 40K. 03:00 - 04:30 1.50 PULL P DECOMP MU Single from shed and secure cable pig tail w/ LaSalle clamp. Single in hole to 14,520' (Did Not Tag) -clear pert interval. UD 9 jts used to drift. 04:30 - 06:00 1.50 PULL P DECOMP Rig up snake to ESP cable for spooling unit. POH standing back 2-7/8" ESP completion. Maintain constant hole fill ~ 20 bbl/hr. 06:00 - 11:00 5.00 PULL P DECOMP Lay down XN nipple, GLM, POH standing back. Weight up pit #2 from 9.6 # to 9.8 #/gal. Hole fill ~ 20 Bbl / Hr. 100 stands out of 222 OOH. 11:00 - 12:00 1.00 PULL P DECOMP Changes spools in spooler for spooling ESP cable as POH 12:00 - 18:00 6.00 PULL P DECOMP Continue POH standing back tubing in Derrick. Continuous hole fill ~ _ 20 Bbls / Hr (no returns). 175 Stands OOH ~ 15:00. Total of 222 stands and one joint, 1 XN nipple, 2 GLM's, out of hole. 18:00 - 20:00 2.00 PULL P DECOMP BO/LD ESP pump and motor assembly. Upper motor locked-up. Recdvered 232 =Lasalle clamps, 6 = Protectolizers, 3 = Flatguards. 20:00 - 20:30 0.50 PULL P DECOMP Clean and clear Ftig floor. MPU PE's dressed two GLM. 20:30 - 23:30 3.00 PULL P DECOMP Remove ESP cable trunk from Derrick, remove ESP pump and Printed: 7/23/2008 2:31:27 PM ., ~ ~ BP EXPLORATION Operations Summary Report Page 3 of 3 ~ Legal Well Name: MPF-18 Common Well Name: MPF-18 Spud Date: 6/3/1996 Event Name: WORKOVER Start: 7/11/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig~fielease: 7/17/2008 Rig Name: NABORS 3S Rig Number: Date I From - To I Hours I Task I Code I NPT I Phase 7/15/2008 120:30 - 23:30 3.00 PULL P 23:30 - 00:00 I 0.50 7/16/2008 100:00 - 02:00 I 2.001 RU 02:00 - 06:00 ~ 4.00 ~ RUN 06:00 - 10:00 4.00 RU 10:00 - 13:00 3.00 RU 13:00 - 19:30 I 6.501 RU 19:30 - 20:00 I 0.50 20:00 - 22:00 I 2.00 22:00 - 23:00 1.00 23:00 - 00:00 1.00 7/17/2008 00:00 - 03:00 3.00 I BOPSU~ P 03:00 - 04:30 1.50 WHSUR P 04:30 - 05:30 1.00 WHSUR P Description of Operations DECOMP motor components from pipe shed and load with new, change out spools in spooling unit. RUNCMP PU/MU ESP pump and motor assembly. Continuous hole fill ~ - 15 BPH loss rate with returns. RUNCMP Continue to PU/MU ESP pump and motor assembly. Run new ESP cable over sheave in Derrick. Centrilift tech make cable connection and conductivity checks. RUNCMP Run ESP completion on 2-7/8" 8rd, EUE, 6.5#, L-80 Tubing from Derrick. Check conductivity of ESP cable every 2,000' and flush pump with 10 bbls of 9.8 ppg brine. Best-O-Life 2000 pipe dope. Torque to 2,300 ft-Ib. Feed wellbore continually with 9.8 ppg brine, with loss rate of -15 BPH with returns. Flushed pump at 3/4 BPM / 1150 psi. Ran 105 joints at 05:30 hrs. RUNCMP 123 stands in the hole. Load hole with 10 Bbls / Hr. RUNCMP Cable to cable splice. Adding 10 Bbls / Hr as make cable splice. Splice located at tbg connection, put 1 clamp immediately above and below spice on tubing joints. RUNCMP Continue to RIH w/ ESP completion on 2-7/8" tubing form Derrick. 10 Bbls /hour hole fill. Flushed pump at 25 spm / 850 psi. Ran total of 445 joints, two GLM's, XN nipple, 3 = Flatguards, 6 = Protectolizers, 230 =LaSalle clamps, tubing hanger thread = 3" LH Acme. RUNCMP PU/MU landing joint and tubing hanger with FMC Wellhead tech. RUNCMP Centrilift tech made tubing hanger penetrator splice and installed shipping cap. RUNCMP Land tubing hanger and RILDS with FMC Wellhead teck ~ 14 24 ', PUW = 85K, SOW = 40K. RUNCMP Dry rod TWC with FMC Wellhead tech and tested from above to 3 500 si for 10 charted minutes. Good test. Blown down lines and drain BOP. RUNCMP Clean Pits and ND BOPE and lay down into shipping cradle. RUNCMP NU 2-9/16"-5M FMC production Tree. RUNCMP FMC Wellhead tech tested tubing head adaptor void to 5,000 psi for 20 minutes, tested Tree to 5,000 psi with deisel, witnessed by BP / WSL. Centrilift made final checks, Intake pressure 3,509 psi, Temp at motor 181.8 deg, Temp of fluid 181.1 deg. RUNCMP PU lubricator to pull TWC with Well techs. Test lubricator to 500 psi. Engage and pull TWC. Tbg and IA on vacuum. Dry rod BPV. Normal up tree and cellar. Release Rig ~ 09:30 am. 05:30 - 09:30 ~ 4.00 ~ WHSUR ~ P Printed: 7/23/2008 2:31:27 PM '"~ STATE OF ALASKA ~ 11/14/07 OIL AND GAS CONSERVATION COMMISSION BOPE Test Report Submit to: 3i~.r~;~~;~~~(;_~_<<>>y duc.an cc. ¢';.~rii?;~n.5as' c~~.uiaska.~uv I~oi~.fe~: €~e::~:>teir~~ala~<€~;~. ca+~~r Contractor: Nabors Rig No.: 3S DATE: 7/14/2008 Rig Rep.: J. Greco / J. Fritts Rig Phone: 659-4487 Rig Fax: 659-4486 Operator: Bp Op. Phone: 659-4485 Op. Fax: 659-4628 Rep.: J. Menke / V. Volpe Field/Unit & Well No.: MP F-18 PTD # 196 1000 Operation: Drlg: Workover: x Explor.: Test: Initial: x Weekly: Bi-Weekly Test Pressure: Rams: 250/3500 Annular: 250/3500 Valves: 250/3500 TEST DATA MISC. INSPECTIONS: FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen.: P Well Sign P Upper Kelly 0 NA Housekeeping: P Drl. Rig P Lower Kelly 0 NA PTD On Location P Hazard Sec. P Ball Type 1 P Standing Order Posted P Inside BOP 1 P B OP STACK: Quantity Size Test Result CHOKE MANIFO LD: Annular Preventer 1 13 5/8 5000 P Quantity Test Result Pipe Rams 1 2 7/8 X 5 P No. Valves 13 P Lower Pipe Rams 0 NA Manual Chokes 1 P Blind Rams 1 Blind P Hydraulic Chokes 1 P Choke Ln. Valves 1 3 1/8" 5000 P HCR Valves 2 3 1/8" 5000 P ACCUMULATOR SYSTEM: Kill Line Valves 1 2 1 /16" 5000 P Time/Pressure Test Result Check Valve 0 NA System Pressure 3100 P Pressure After Closure 1550 P MUD SYSTEM: Visual Test Alarm Test 200 psi Attained 23sec P !, Trip Tank P P Full Pressure Attained 2 min 3 sec P !, Pit Level Indicators P P Blind Switch Covers: All stations P Flow Indicator P P Nitgn. Bottles (avg): 2075 Meth Gas Detector P P H2S Gas Detector P P Test Results Number of Failures: 0 Test Time: Hours Components tested ALL Repair or replacement of equ ipment will be made within 4.5 days. Notify the North Slope Inspector 659-3607, follow with written confirmation to Superviser at: jir':,:e~zL`~=~laska.gcv Remarks: tested w/ 2 7/8 test joint 24 HOUR NOTICE GIVEN YES X NO Waived By Jeff Jones Date 07/12/08 Time 13:30 Witness J.Greco/J.Menke Test start 12:30 PM Finish 17:00 BOP Test (for rigs) ~ )~ ~~L ~ ~ ~~~~ BFL 11/14/07 Nabors 3s BOP Test MP F-18 7-14-08.x1s OPERABLE -MPF-18 (PTD #10000) Online ESP completion • Page 1 of 1 Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlnfegrityEngineer@BP.com] r Sent: Saturday, March 15, 2008 3:11 PM ~~~ 3` `~~~~' To: Regg, James B (DOA); Maunder, Thomas E (DOA); MPU, Area Manager; MPU, Well Operations Supervisor; MPU, Wells Ops Coord; MPU, Wells Ops Coord2; NSU, ADW Well Operations Supervisor; Rossberg, R Steven; Engel, Harry R Cc: Roschinger, Torin T.; Leonard, Nathan; NSU, ADW Well Integrity Engineer Subject: OPERABLE -MPF-18 (PTD #19610) Online ESP completion Hi all, Milne Point Well MPI=-18is back online as of 03/7108. On 03115/08 the we(Ihead pressures were tubingllAfOA aqua( to 289/4A0/480. The wail has been reclassified as Operable. % Please call with any questions. Thank you, ,~nna ~uFie, l'. E. Well Integrity Coordinator GP Vtfells Groin , ~~~ ~~, ~ ~,41t~ Phone: (~) 659-5102 ~'~+' Pager: (JU7) 659-51flt} x1154 From: NSU, ADW Well Integrity Engineer Sent: Wednesday, February 20, 2008 9:45 PM To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; MPU, Area Manager; MPU, Well Operations Supervisor; MPU, Wells Ops Coord; MPU, Wells Ops Coord2; NSU, ADW Well Operations Supervisor; Rossberg, R Steven; Engel, Harry R Cc: Townsend, S. Eliot; NSU, ADW Well Integrity Engineer; Leonard, Nathan Subject: UNDER EVALUATION -MPF-18 High IAP due to ESP completion Hi all, Milne Point Well MPF-18is a packerless ESP completion. Due to the IA being open to formation and the well being shut- in, the well has confirmed high IA pressure. The wellhead pressures were tubing/IA/OA were shut-in/2130/40 on 02/19/08. The well has been reclassified as Under Evaluation on a 28 day clock starting 02/18/08. The plan forward includes: 1. MP: Bleed IA pressure MP: Pump fluid down the IA to knock down the IA pressure 3118/2008 RE: UNDER EVALUATION - ~ 18 (PTD #1961000) High IAP due to ESP completion Page 1 of 1 • Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityE~r@BP.com] Sent: Wednesday, February 20, 2008 11:33 PM ~ ~ q ~~ 4:~~ ~~ To: Regg, James B (DOA); Maunder, Thomas E (DOA) 1 Cc: NSU, ADW Well Integrity Engineer Subject: RE: UNDER EVALU/ N -MPF-18 (PTD #1961000) High IAP due to ESP completion Attachments: MPF-18 90-day TIO plot.BMP; MPF-18.pdf I apologize I forgot the PTD number, schematic, and TIO plot for reference. «MPF-18 90-day TIO plot.BMP» «MPF-18.pdf» From: NSU, ADW Well Integrity Engineer Sent: Wednesday, February 20, 2008 9:45 PM To: 'Regg, ]ames B (DOA)'; 'Maunder, Thomas E {DOA)'; MPU, Area Manager; MPU, Well Operations Supervisor; MPU, Wells Ops Coord; MPU, Wells Ops Coord2; NSU, ADW Well Operations Supervisor; Rossberg, R Steven; Engel, Harry R Cc: Townsend, S. Eliot; NSU, ADW Well Integrity Engineer; Leonard, Nathan >~.~~~ t, A ~t1 6~ ~ 2~4~ Subject: UNDER EVALUATION -MPF-18 High IAP due to ESP completion "~~~ Hi all, Milne Point Well MPF-18 (PTD #1961000) is a packerless ESP completion. Due to the IA being open to formation and the well being shut-in, the well has confirmed hi h IA ressure. The wellhead pressures were tubing/IA/OA were shut- ./ in/2130/40 on 02/19/08. The well has een reclassified as Under Evaluation on a 28 day clock starting 02/18/08. The plan forward includes: 1. MP: Bleed IA pressure 2. MP: Pump fluid down the 1A to knock down the IA pressure 3/13/2008 ~,ooa ...............................................1~1'P~"1'8'T1~PI~bY............... 3,0x0 i:s n,1.~ASP 2,aoo 1,aoo ' ~~~ r~n~.~.sp a 11 ~20~Oa7 121'S~20a7 '! 2~20f2aa7 -~- Tbg -~- IA tR6 -~ o© ~ ~srzoas 1 r~ar2oa$ 214Floaa ~rzar~aos 3~r~aas NtP~ ~' ~~ ~ ~~ ~- a~. Boa r- aaa~ Tree: 2 9/16" - 5M FMG Wellhead: 11" 5M FMC wl 2718" WKM Tubing Hanger , w/ 3" Acme Threads. , 2.5" CIW H BPV profile 115' 20' 91.1 ppf, H-40 KOP @ 600' Max. hole angle = 67 to 71 deg. f/ 3700 to 13300' Hole angle thru' perfs = 45 deg No DLS = 3 deg./100' 9 5/8"', 40#/ft, L-80 7914' Btrc. 7" 26 ppf, L-80, NSCC production casin ( drift ID = 6.151", cap. = 0.0383 bpf ) 2 7/8" 6.5 ppf, L-80, $ rd EUE tbg.. {drift ID = 2.347", cap. = 0.00592 bpf ) ~, KB Elev. = 40.65 (N 22E) Orig. GL Elev. = 12.40' RT To Tbg. Spool = 28.6' (N 22E) Camco Sidepocket 180` KBMM GLM 2-718" x 1" Camco Sidepocket 13992, f KBMM GLM 2-718" x 1 " HES 2-7/8" "XN" Nipple (2.205 No-go) 14136' ip, 122 stg. GC2200 14186` gyp, 19 stg GC8200 14207` Jem Gas Separator, eIGRSTXBARH6 14214' Intake @ 7027' tvd dem Seal Section ~ 14218' Stimulation Summary 06!21196- 154.1 Mib 16!20 Carbolite behine Pipe. Job went Flush I Perforation Summary Ref log: 06/18/96 GR/CCL Size SPF Interval (TV A-Sand 3 3/8 6 14434'-14470' (7178'-7 3 3/8 6 14482'-14522' (7212'-7 22 j Jumbo Jet charges, (EHD=0.76" TTP=6.4" @ 135!45 Deg Phaseing an Random Orientation mid-pert = 7209' tvd 14478' and 07/06/96 MDO 07(19!96 DLH 07(08/01 GMH 06!06/04 JRC BY COMMENTS CTU Cleanout ESP Completion Nabors 4ES ESP RWO Doyon 14 ESP RWO tor, 228 HP, 2305 vol#, 14233' amp npMate w16 Fin 14256` itralizer ~t joint from 14196' to 14236' wlm w/ ~tive marker at 14196' wlm. Fish in hole - 6 Fin Centralizer pushed to 14,522`. float collar (NBTD) 7" float shoe 148 4' MD 14915' MD MILNE POINT UNIT WELL F-18 API NO: 50-029-226$1 BP EXPLORATION (AK) MP~ F-~ 1. Operations as a Performed: Alter casiA§ rage Pull Tubing 0 Change Approved Program 0 Operat. Shutdown 0 2. Operator BP Exploration (Alaska), Inc. Name: RECE'VED ~ , . _..f.'d7 STATE OF ALASKA MAR 2 1 2~~S~OIL AND GAS CONSERVATION COMMaN REPORT OF SUNDRY WELL OPERATIONS o o o Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development IV Stratigraphic Stimulate 0 Other 0 Acid Treatment Waiver 0 Time Extension 0 Re-enter Suspended Well 0 5. Permit to Drill Number: 196-1000 P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): Exploratory Service 6. API Number: 50-029-22681-00-00 ... 3. Address: 9. Well Name and Number: 40.65 KB MPF-18 ~ ADLO-355018 11. Present Well Condition Summary: 10. Field/Pool(s): MILNE POINT Field/ KUPARUK RIVER OIL Pool - 8. Property Designation: Total Depth measured true vertical 14941 ' 7530 . feet feet Plugs (measured) Junk (measured) None 14522' Effective Depth measured 14834 feet true vertical 7456 feet Casing Length Size MD TVD Bu rst Collapse Conductor 80' 20" 91.1# H-40 32' - 112' 32' - 112' 1490 470 Surface 7883' 9-5/8" 40# L-80 31' 7914' 31' - 4529' 5750 3090 Production 14886' 7" 26# L -80 29' - 14915' 29' - 7512' 7240 5410 Perforation depth: Measured depth: 14434 - 14470 True Vertical depth: 7178.45 -7203.94 14482 - 14522 7212.42 - 7240.58 _ ~GANNED MAR 2 8 2007 - Tubing: (size, grade, and measured depth) 2-7/8" 12.6# L-80 Surface - 14258' Packers and SSSV (type and measured depth) N/A o o o o o o o 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations Oil-Bbl 484 475 Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure 126 1655 0 127 1704 0 15. Well Class after proposed work: Exploratory r Development IV 16. Well Status after proposed work: Oil IV Gas WAG Tubing pressure 274 278 13. Service x Contact Gary Preble WINJ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Title Data Management Engineer Signature Phone 564-4944 Date 3/20/2007 Form 10-404 Revised 04/200Û RIG I N A L MAR 2 8. torn ) f;AUQ""7 )'~ Submit Original Only . . MPF-18 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY T/I/O=350/450/350. Temp=Warm. (Perf Matrix Acid Stem). MIRU Pumpers and Held PJSM, PT hardline to 2500 psi. Pumped 18 stages of matrix acid stem. Continue on 3/15/07 WSR. 3/14/2007 (Matrix Acid treatment) Standby to pump acid returns. 3/15/2007 ***Continue from 3/14/07 wsr*** (Perf Matrix acid Stem) Continue Pumping Acid. Pumped 124 bbls NH4CL Finish Matrix Acid stem. Final BHP - 2930 psi. job complete Rig down equipment and pump. ***RDMO*** FLUIDS PUMPED BBLS I 360/40 METH 3 TOTAL 1. Operations Abandon D Repair Well D Performed: Alter Casing D Pull Tubing D Change Approved Program D Operat. Shutdown D 2. Operator BP Exploration (Alaska), Inc. Name: ~ I, "', ' ~L_'\ 1'-1 I . STATE OF ALASKA J~..L.I RECEIVED ALA Oil AND GAS CONSERVATION COM.O~ Ç¡:B 2 8 2007 REPORT OF SUNDRY WELL OPERATIONSL- D Stimulate~s a tI ~t ~ OfM1ISSlon D WaiverD Time 'A'fteMjfllñi8] D Re-enter Suspended WellÐ 5. Permit to Drill Number: 196-100 / Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development P Stratigraphic Exploratory Service 6. API Number: 50-029-22681-00-00 . P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): 3. Address: 9. Well Name and Number: 40.65 KB / MPF-18 ' ADLO-355018 / 11. Present Well Condition Summary: 10. Field/Pool(s): MILNE POINT Field/ KUPARUK RIVER OIL Pool I 8. Property Designation: Total Depth measured true vertical 14941 J 7530 / feet feet Plugs (measured) Junk (measured) None 14522' Effective Depth measured 14834 feet true vertical 7456 feet Casing Length Size MD TVD Burst Collapse Conductor 80' 20" 32' - 112' 32' - 112' 1490 470 Surface 7883' 9-5/8" 40# L-80 31' - 7914" 31' - 4529' 5750 3090 Production 14886' 7" 26# L-80 29' - 14915' 29' - 7512' 7240 5410 Perforation depth: Measured depth: 14434 - 14470 True Vertical depth: 7178.45 -7203.94 14482 - 14522 7212.42 -7240.58 - - Tubing: (size, grade, and measured depth) 2-7/8" 12.6# L-80 14258' Packers and SSSV (type and measured depth) n/a o o o o o o o 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations Oil-Bbl 469 468 Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure 119 1774 0 116 1741 0 15. Well Class after proposed work: Exploratory Development P 16. Well Status after proposed work: Oil :P Gas WAG Tubing pressure 280 277 13. Service x Contact Gary Preble WINJ WDSPl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Title Data Engineer Signature Phone 564-4944 Date 2/27/2007 RIGINAL Submit Original Only ~ . . MPF-18 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY T/I/O=300/700/340. (Acid treatment). Spear into tbg wi 10 bbls crude followed by 10 bbls 12% DAD acid. Flush wi 3 bbls 60/40 meth & 76 bbls crude. FWH P=0/900/20. 2/17/2007 00010/200. (Acid returns). Pump 187 bbls acid returns down MPB-50 for disposal. FWHP=105010/200. FLUIDS PUMPED BBLS 10 12% DAD ACID 86 CRUDE 96 TOTAL (' STATE OF ALASKA '" ALASKA \.IlL AND GAS CONSERVATION C01",.J1ISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: 0 Abandon 0 Alter Casing 0 Change Approved Program 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 7. KB Elevation (ft): KBE = 40.65' 0 Suspend 181 Repair Well 181 Pull Tubing 8. Property Designation: ADL 355018 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 14941 7530 14834 7456 Casing Structural Conductor Surface Intermediate Production Liner Length 80. 7883' 14886' Perforation Depth MD (ft): Perforation Depth TVD (ft): 0 Waiver 181 Other 0 Time Extension Change out ESP 0 Annular Disposal 5. Permit To Drill Number 196-100 6. API Number: 50-029-22681-00-00 0 Operation Shutdown 0 Perforate 0 Plug Perforations 0 Stimulate 0 Perforate New Pool 0 Re-Enter Suspended Well 4. Current Well Class: II Development 0 Exploratory 0 Stratigraphic Test 0 Service 9. Well Name and Number: MPF-18 10. Field 1 Pool(s): Milne Point Unit 1 Kuparuk River Sands feet feet Plugs (measured) None feet Junk (measured) Fish at 14522' feet Size MD TVD Burst 20" 112' 112' 1490 9-5/8" 7914' 4529' 5750 711 14915' 7512' 7240 Collapse 470 3090 5410 JUN ;~, 0 '2.004 14434. - 14522' 7178' - 7241' 12.6#, L-8£h\):~.blü~:'ô~t:: 14258' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): NIA 2-7/8" 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: OMS BFi~ jUl 0 6 1.0~~ 13. Oil-Bbl Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl CasinQ Pressure Tubinq Pressure Prior to well operation: Subsequent to operation: 14. Attachments: 0 Copies of Logs and Surveys run II Daily Report of Well Operations II Well Schematic Diagram 15. Well Class after proposed work: 0 Exploratory II Development 0 Service 16. Well Status after proposed work: II Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Skip Coyner, 564-4395 Printed Name Sondra Stewman ~. signat~ .-I~^ '. . ... r-- Form 10-404 Revised 12/200 Title Technical Assistant Phone 5 4 7 0 0 q I G I Kr~ L J Prepared By Name/Number: Date C)lp-;;A-or Sondra Stewman, 564~4750 Tree: 2 9/16" - 5M FMC Wellhead: 11" 5M FMC wI 2 7/8" WKM Tubing Hanger, wI 3" Acme Threads, 2.5" CIW H BPV profile ( 20" 91.1 ppf, H-40 I 115' I i KOP @ 600' Max. hole angle = 67 to 71 deg. fl 3700 to 13300' Hole angle thru' perfs = 45 deg No DLS = 3 deg./100' 95/8", 40#/ft, L-80 Btrc. I 7914' I j 7" 26 ppf, L-80, NSCC production casing ( drift 10 = 6.151", cap. = 0.0383 bpf ) 27/8" 6.5 ppf, L-80, 8 rd EUE tbg.. ( drift 10 = 2.347'" cap. = 0.00592 bpf ) Stimulation Summary 06/21/96~ 154.1 Mlb 16/20 Carbolite behine Pipe. Job went Flush Perforation Summary Ref log: 06/18/96 GR/CCL Size SPF Interval (TVO) 3 3/8 6 3 3/8 6 A-Sand = 14434'-14470' (7178'-7204') :: 14482'-14522' (7212'-7241 ') ::: 22 j Jumbo Jet charges, (EHO=0.76" TTP=6.4" @ 135/45 Oeg Phaseing and Random Orientation mid-perf = 7209' tvd 14478' md DATE 07/06/96 07/19196 07/08/01 06106/04 REV BY MOO DLH GMH JRC CTU Clean out ESP Completion Nabors 4ES ESP RWO Doyon 14 ESP RWO MPU F-18 -) - -= i ( .j. KB Elev. = 40.65 (N 22E) Orig. GL Elev. = 12.40' RT To Tbg. Spool = 28.6' (N 22E) ~ Cameo Sidepocket I KBMM GLM 2-7/8" x 1" 180' ~ COMMENTS i Cameo Sidepocket KBMM GLM 2-7/8" x 1" 13992' I HES 2-7/8" "XN" I 14136' I Nipple (2.205 No-go) Pump, 122 stg. GC2200 I 14186' I Pump, 19 stg GC8200 I 14207' I Tandem Gas Separator, I 14214' I Model GRSTXBARH6 Intake @ 7027' tvd Tandem Seal Section I 14218' I Motor, 228 HP, 2305 volt, I 14233' I 60 amp PumpMate w/6 Fin Centralizer I 14256' 7" short joint from 14196' to 14236' wlm wi radioactive marker at 14196' wlm. - - - = Fish in hole - 6 Fin Centralizer pushed to 14,522'. - - - ... 7" float collar (PBTO) 7" float shoe 114834' MD I 114915' MD I MILNE POINT UNIT WELL F-18 API NO: 50-029-22681 BP EXPLORATION (AK) ( f BP Operations Summary Report Page 1 of 2 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPF-18 MPF-18 WORKOVER DOYON DRILLING INC. DOYON 14 Start: 5/30/2004 Rig Release: 6/6/2004 Rig Number: Spud Date: 6/1/2004 End: Date From - To Hours Task Code NPT Phase Description of Operations 5/31/2004 10:30 - 00:00 13.50 MOB P PRE Skid floor, move rig off of MPJ-26, install Booster wheels, Move rig to MPF-18 6/1/2004 00:00 - 02:00 2.00 MOB P PRE Remove Booster wheels, spot rig over well 02:00 - 04:00 2.00 MOB P PRE Skid floor, rig up, Rig accept @ 04006/1/2004 04:00 - 06:30 2.50 KILL P INTERV Rigging up to Tree and flow tank to kill well, test lines to 3,500 psi, filling pits with 140 degree sea water 06:30 - 07:30 1.00 KILL P INTERV Pull BPV, TBG pressure 1200 psi, annulus 1200 psi, 07:30 - 08:30 1.00 KILL P INTERV Add 1 % KCL to seawater wt. 8.3 08:30 - 09:00 0.50 KILL P INTERV pre-spud meeting on well kill 09:00 - 10:00 1.00 KILL P INTERV Break circ. with 140 degree 8.3 seawater @ 3.5 bbls min 1400 psi pumped 84 bbls, holding back pressure on choke, shut annulus bullhead 96 bbls @ 3.5 bbls min. 2000 psi 10:00 - 10:30 0.50 KI LL P INTERV Monitor well, 20 min tubing 560 psi annulus 560 psi 10:30 - 12:00 1.50 KILL P INTERV Circ bottoms up with well on choke @ 4.5 bbls min. 1920 psi annulus pressure 400 psi 12:00 - 17:00 5.00 KILL P INTERV Shut in monitor well 350 psi on tubing and 350 psi on annulus, weight up to 9.4 ppg 17:00 - 20:00 3.00 KILL P INTERV Killing well, Pumped kill brine @ 3 bbls min 920 psi 20:00 - 20:30 0.50 KILL P INTERV Monitor well, no flow, no loss of brine on well kill 20:30 - 23:00 2.50 KILL P INTERV Install TWC, test to 1000 psi from top, break down circ. lines 23:00 - 00:00 1.00 RUNCOMP INTERV Picking up 4" pipe and standing in derrick, for belly board 6/2/2004 00:00 - 01 :00 1.00 RUNCOMP INTERV Picking up 4" pipe and standing in derrick for belly board, Total 13 stands, 39 jts. 01 :00 - 02:30 1.50 RUNCOMP INTERV Nipple down Tree 02:30 - 05:00 2.50 RUNCOMP INTERV Nipple up BOPs, change lower rams to 2 7/8 05:00 - 12:00 7.00 RUNCOMP INTERV Test BOPS and Manifold 250-3500 psi 5 min per test,failed hydril test., BOP test witness by Lou Grimaldi AOOGC, 12:00 - 20:00 8.00 RUNCOrvf\J SFAL INTERV Change out hydrill rubber, had to work element several of times to get it to seal on 2 7/8 pipe, good test 250 low 2500 high 5 min. tests, rig down test lines 20:00 - 21 :00 1.00 RUNCOMP I NTERV M/U landing jt, check for pressure on annulus, dry rod out TWC 21 :00 - 21 :30 0.50 RUNCOMP INTERV Pulled hanger to floor with total 125K , block wt 50 K, pull on tubing 75K 21 :30 - 22:30 1.00 RUNCOMP INTERV Rig up ESP cable spooling unit and tubing tongs 22:30 - 00:00 1.50 RUNCOMP INTERV PJSM, standing back 2 7/8 in derrick,spooling up ESP cable 6/3/2004 00:00 - 14:00 14.00 RUNCOMP INTERV Pulling 2 7/8 tubing standing in derrick, spooling up ESP cable 14:00 - 17:00 3.00 RUNCOMP INTERV Lay down ESP cable, Decommission pump, recover all Lasalle clamps, 4 prorectorlizers, 3 flat guards, lay down pump and motor (Left Pump mate centralizer in hole 6 od .65 long) 17:00 - 18:00 1.00 KILL P INTERV Monitor well, hole flowing 2 bbls hr. 18:00 - 19:00 1.00 KILL N DPRB INTERV Rig up to run tubing, Trip in to 384 with tubing over flowing oil 19:00 - 19:30 0.50 KILL N DPRB I NTERV Circ off oil cap, 106 gpm 50 psi 19:30 - 20:00 0.50 KILL N DPRB INTERV Trip in to 1920, well flowing 20:00 - 21 :00 1.00 KILL N DPRB INTERV Circ. off oil and gas no gain while circ. 190 gpm 230 psi 21 :00 - 23:00 2.00 KILL N DPRB INTERV Trip in to 3900, well flowing 23:00 - 00:00 1.00 KILL N DPRB INTERV Circ. off oil and gas no gain while circ. 190 gpm 450 psi 6/4/2004 00:00 - 01 :30 1.50 KILL N DPRB INTERV Trip in to 6300, well flowing 01 :30 - 02:30 1.00 KILL N DPRB INTERV Circ. off oil and gas no gain while circ. 4.5 bbls min. 470 psi 02:30 - 05:30 3.00 KILL N DPRB I NTERV Trip in to 12100, well flowing 05:30 - 07:00 1.50 KILL N DPRB INTERV Circ. off oil and gas no gain while eirc. 5 bbls min. 1780 psi 07:00 - 08:00 1.00 KILL N DPRB INTERV Trip in to 13940 08:00 - 08:30 0.50 KILL N DPRB INTERV Cross over to 4" drill pipe 08:30 - 09:30 1.00 KILL N DPRB INTERV Trip in to 14522, bottom of perfs. took wt @ 14482 pumped to Printed: 6/7/2004 9:00: 19 AM { ( BP Operations Summary Report Page 2 of 2 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPF-18 MPF-18 WORKOVER DOYON DRILLING INC. DOYON 14 Start: 5/30/2004 Rig Release: 6/6/2004 Rig Number: Spud Date: 6/1/2004 End: Date From - To Hours Task Code NPT Phase Description of Operations 6/4/2004 08:30 - 09:30 1.00 KILL N DPRB INTERV 14522 , pulled back to 14,334 09:30 - 11 :00 1.50 KILL N DPRB INTERV Circ @ 14334 1 bottoms up, 4.5 bbls min. 1580 psi, 22 bbl gain 150 psi loss on pump from gas bubble 11 :00 - 14:00 3.00 KILL N DPRB INTERV Pump high vis sweep, and raise mud wt. to 9.5, 4.5 bbls min 1420 psi 14:00 - 22:30 8.50 KILL N DPRB INTERV PJSM, Observe well, Tripping out with 2 7/8 tubing well took 14 bbls over calc. 22:30 - 23:00 0.50 RUNCOMP INTERV Rig up to pick up ESP pump 23:00 - 00:00 1.00 RUNCOMP INTERV PJSM, Picking up ESP pump 6/5/2004 00:00 - 02:30 2.50 RUNCOMP INTERV PJSM, Hooking up ESP pump 02:30 - 09:00 6.50 RUNCOMP INTERV Tripping in with ESP pump, checking conductivity every 2,000 ft., fill pipe when checking cable, pump 10 bbls thru pump @ 1 bbl min. to clear pipe, 09:00 - 13:00 4.00 RUNCOMP INTERV Change out spool, splice and test, @ 8,127' 13:00 - 18:00 5.00 RUNCOMP INTERV Tripping in with ESP pump, checking conductivity every 2,000 ft., fill pipe when checking cable, pump 10 bbls thru pump @ 1 bbl min. to clear pipe, P/U wt 116 K, Slo wt 84 K, Block wt 50 K, run with 230 clamps, Total jts run 445 18:00 - 21 :00 3.00 RUNCOMP INTERV Picking up hanger Hooking up ESP cable and testing 21 :00 - 22:00 1.00 RUNCOMP INTERV Land tubing, install TWC, test to 1000 psi 22:00 - 00:00 2.00 RUNCOMP INTERV Nippling down BOPS 6/6/2004 00:00 - 01 :00 1.00 RUNCOM INTERV Nippile down Bop adapter flange and set back BOPS 01 :00 - 02:30 1.50 RUNCOM INTERV Nipple up 71/16 X 29/16 FMC ESP adapter and CIW 29/16 tree test Packoff and tree to 5 K 02:30 - 03:30 1.00 RUNCOM INTERV Rig up Lubricator pull TWC and set BPV, test ESP cable, secure well 03:30 - 05:00 1.50 RUNCOM INTERV Laying down drill pipe out of derrick, (Rig release for summer maintenance @ 05:00 6/6/2004 ) 05:00 - 06:00 1.00 MOB INTERV Rigging down Printed: 6/7/2004 9:00: 19 AM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMI~blON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate [] Pull Tubing [] Alter Casing [] Repair Well [] Other Change Out ESP 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. [] Development Plan RTE = 40.65' [] Exploratory 7. Unit or Property Name 3. Address [] Stratigraphic Milne Point Unit P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service 4. Location of well at surface 8. Well Number 1872' NSL, 2820' WEL, SEC. 6, T13N, R10E, UM MPF-18 At top of productive interval 9. Permit Number / Approval No. 196-100 667' NSL, 4332' WEL, SEC. 25, T14N, R09E, UM 10. APl Number At effective depth 50-029-22681-00 896' NSL, 4508' WEL, SEC. 25, T14N, R09E, UM 11. Field and Pool At total depth Milne Point Unit / Kuparuk River 957' NSL, 4556' WEL, SEC. 25, T14N, R09E, UM Sands 12. Present well condition summary Total depth: measured 14941 feet Plugs (measured) true vertical 7530 feet Effective depth: measured 14834 feet Junk (measured) true vertical 7456 feet Casing Length Size Cemented M D TVD Structural Conductor 80' 20" 250 sx Arcticset I (Approx,) 112' 112' Surface Intermediate Production 7883' 9-5/8" 1750 sx PF 'E", 600 sx 'G', 7914' 4529' Liner 14886' 7" 220 sx Class 'G' 14915' 7512' Perforation depth: measured 14434'- 14470', 14482'- 14522' BUG 0 6 5001 true vertical 7128' - 7204', 7212' - 7241' Alas~,a Oil & Gas Cons. commisSiOn Tubing (size, grade, and measured depth) 2-7/8", 6.5#, L-80 to 14250'. Anchorage Packers and SSSV (type and measured depth) None 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Attachments 16. Status of well classifications as: [] Copies of Logs and Surveys run [] Oil [] Gas [] Suspended Service [] Daily Report of Well Operations 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Son~~- - Title Technical Assistant Date ~-~? ---C)~.-L~ i i~t ~ I ~ I ~,_ ] ~t ! Prepared ByName/Number: Sondra ........ Stewman, 564-4750 Form 10-404 Rev. 06/15/88 ORIGINAL Submit In Duplicate ~LORATION Page 1 ell ry Report Legal Well Name: MPF-18 Common Well Name: MPF-18 Spud Date: 6/3/1996 Event Name: WORKOVER Start: 7/5/2001 End: Contractor Name: NABORS Rig Release: Rig Name: NABORS 4ES Rig Number: Date- ~From- To Hours Activity Cod~NPT I Phase ~ Description of Operations 7/6/2001 22:00 - 00:00 2.00 RIGU P DECOMP MOVE RIG FROM L PAD TO MPF-18 7/7/2001 00:00 - 04:30 4.50 RIGU P DECOMP SPOT RIG. RAISE AND SCOPE DERRICK. RU TANK AND LINES. 04:30 - 06:00 1.50 RIGU P DECOMP RU LINES TO TREE. PULL BPV. 06:00 - 09:00 3.00 RIGU P DECOMP MIX BRINE TO 8.9#/GAL. TEST LINES. HOLD PRE-KILL SAFETY MEETING. 09:00 - 15:00 6.00 RIGU a DECOMP PUMP DOWN TBG. CIRCULATE WELL OVER TO 8.9# BRINE. MONITOR. SMALL FLOW OBSERVED. WEIGHT UP TO 9.0+# AND CIRCULATE WELL AGAIN. MONITOR. DEAD. 15:00-16:00 1.00 PULL a DECOMP SET AND TEST TWC. 16:00 - 17:00 1.00 PULL a DECOMP REMOVE TREE. 17:00 - 19:00 2.00 PULL a DECOMP INSTALL DOPE 19:00 - 20:00 1.00 PULL a DECOMP PERFORM DOPE TEST PER BP/AOGCC REQUIREMENTS. RIGHT TO WITNESS TEST WAIVED BYAOGCC...J. JONES. 20:00 - 22:30 2.50 PULL ~ DECOMP PULL TWC. BOLDS. A'I-I'EMPT TO PULL HANGER FREE AT 80% OF TT. NO JOY. SPOT EP MUD LUBE. PULL FREE. 22:30 - 00:00 1.50 PULL P DECOMP LD HANGER AND LANDING JT. RU TO PULL 2 7/8" ESP COMPLETION. 7/8/2001 00:00 - 08:30 8.50 PULL P DECOMP POOH WITH 2 7/8" TBG AND ESP COMPLETION. 08:30 - 09:30 1.00 PULL P DECOMP INSPECT AND LD ESP ASSY. 09:30 - 10:30 1.00 PULL P DECOMP CHANGE OUT ESP CABLE SPOOLS. CLEAR FLOOR. 10:30 - 12:00 1.50 REST P DECOMP PU NEW ESP ASSY...SERVlCE AND TEST. 12:00 - 13:30 1.501 REST P DECOMP CONNECT AND SECRUE ESP CABLE. MEG TEST...GOOD. 13:30 - 18:30 5.00 REST P DECOMP BEGIN TIH WITH ESP COMPLETION AND 2 7/8" TBG. 18:30 - 22:30 4.00 REST P DECOMP STOP TO CHANGE SPOOLS AND MAKE MID CABLE SPLICE. TEST GOOD. 22:30 - 00:00 1.50 REST P DECOMP CONTINUE RIH WITH ESP COMPLETION AND 2 7/8" TBG. 7/9/2001 00:00 - 02:00 2.00 REST P DECOMP FINISH RIH WI2 7/8" TBG AND ESP COMPLETION. 02:00 - 04:00 2.00 REST a DECOMP INSTALL PENETRATOR. ATTACH CABLE AND TEST...GOOD. LAND HANGER. RILDS. 04:00 - 04:30 0.50 REST a DECOMP INSTALL TWC. TEST AT 3500 PSI. GOOD. 04:30 - 06:00 1.50 REST a DECOMP ND DOPE. 06:00 - 08:00 2.00 REST a DECOMP INSTALL TREE. TEST TO 5000PSI. GOOD. 08:00 - 08:30 0.50 REST a DECOMP PULL TWC. SET BPV. 08:30 - 09:00 0.50 REST a DECOMP SECURE TREE AND CELLAR. RELEASE RIG. PREPARE TO RDMO. Printed: 7/16/2001 1:25:01 PM MATERIAL UNIL)_ER THIS coVER tlAS BEEN ON OR BEFORE PERMIT DATA AOGCC Individual Well Geological Materials Inventory T DATA PLUS Page: 1 Date: 07/07/98 RUN RECVD 96-100 GR/CCL ~/~EPIA 20-14805 1 07/12/96 96-100 96-100 96-100 96-100 96-100 PLS GR/CCL/PERF /~/RES-MD CNP/SLD/GR-MD ~GR/RES-TVD J~EPIA 14420-14580 ~-~/SEPIA 14180-14600 ~447-14941 ,~7935 -14941 ~/447-7523 1 07/12/96 1 07/12/96 FINAL 01/22/97 FINAL 01/22/97 FINAL 01/22/97 96-100 96-100 FINAL 01/22/97 Are dry ditch samples required? yes ~_~And received? ye~--n-o~- Was the well cored? yes ~_Analysis & description received? Are well tests required? , yes ~-Received? Well is in compliance Initial COMMENTS ri I::! I I__1__ I I~J G S I:: F::I b' I r' I::: S WELL LOG TRANSMITTAL To: State of Alaska March 5, 1997 Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - MPF-18 RE: AK-MM-96630 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted LIS Tape with verification listing. APl#: 50-029-22681-00 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, Inc. Company spenn /-sun Ci I=! I I_1_ I IM G SEI~L~I i-- E S WELL LOG TRANSMITTAL To: State of Alaska January 22, 1997 Alaska Oil and Gas Conservation Comm. Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs - MPF-18, AK-MM-960630 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Ytrn Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 2" x 5" MD Resistivity and Gamma Ray Logs: 2" x 5" TVD Resistivity and Gamma Ray Logs: 2" x 5" MD Neutron, Density & Gamma Logs: 2" x 5" TVD Neutron, Density & Gamma Logs: 1 Blueline 1 Rev. Folded Sepia 1 Blueline 1 Rev. Folded Sepia 1 Blueline 1 Rev. Folded Sepia 1 Blueline 1 Rev. Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company STATE OF ALASKA ALASt,,,-, OIL AND GAS CONSERVATION Cu,vlMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG '":i'. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 96-100 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22681 4. Location of well at surface ~~" 9. Unit or Lease Name 1872' NS L, 2820' W EL, SEC. 6, T1 aN, R10E. ~%t.~,~-~ ~:. :~.:: ~r.i ~-?~"~ ~.~ ,¢~,,,,/....,~.~~__q.2/~ q Milne PointUnit At top of productive interval ~ .:.- ' ..... ~ [ 10. Well Number 669' NSL, 4330' WEL, SEC. 25, T14N, RaE i~~~i!~,. °.i~?~ MPF-18 959' NSL, 4554' WEL, SEC. 25, T14N, R9E !.-'~4...¢- i' " ...... Milne Point Unit/Kuparuk River '5".' Elevation in feet (indicate KB, DF, etc.) 16. ILeas6'-D~"~g-~tion and Serial No. Sands Plan RTE = 41'J ADL 355018 12. Date Spudded06/03/96 I13' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'l15' Water depth' if °fish°re 16' N°' °f C°mpleti°ns06/l 2/96 07/17/96 N/A MSL One 17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD)I19. Directional Surveyl20. Depth where SSSV set~l. Thickness of Permafrost 14941 7530 FT~ 14834 7456 FT~ ~Yes I~No I N/A MD! 1800' (Approx.) 22. Type Electric or Other Logs Run Gyro, MWD, LWD, EMS, GR/RES, GR/CDR/CDN 23. CASING, LINER AND CEMENTING RECORD CASING SE-I-riNG DEPTH HOLE SIZE VVT. PER FT. GRADE TOP BO-FI'OM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.1# H-40 32' 112' 24" 250 sx Arcticset I (Approx.) 9-5/8" 40# L-80 31' 7914' 12-1/4" 1600sxPF'E',600sx'G', 150sxPF'E' ,,, 7" 26# L-80 29' 14915' 8-1/2" 220 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 3-3/8" Gun Diameter, 6 spf 2-7/8", L-80 14240' N/A MD TVD MD TVD 14434'-14470' 7171 '-7196' 14482'-14522' 7205'-7233' :26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protect w/80 bbls diesel ~"4434'-14470',14482'-14522 Frac'd w/154100# 16/20 Carbolite behind pipe 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) July 21, 1996 I Electric Submersible Pump Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD · I Flow Tubing Casing Pressure CALCULATED · OIL-DEL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED ORiGiNAL NOV 2 1 1996 Alaska Oil & 6as Oons. commission Anchorage Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Mark. 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. (Subsea) Top Kuparuk A3 14433' 7137' Top Kuparuk A2 14450' 7149' Top Kuparuk A1 14482' 7172' ,, 31. List of Attachments Summary of Daily Drilling Reports, Surveys, Annular Injection Report 32. I hereby certify that the fo~.regoin_g, is tr,ue and opr~ectto the best of my knowledge Signed 'l~mSchofield /~' ~%~'~..(~ Title Senior Drilling Engineer Date Prepared By Name/Number: Kathy Camp or, 564-5122 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: MPF-18 Rig Name: N-22E AFE: 337027 Accept Date: 06/02/96 Spud Date: 06/03/96 Release Date: 06/1 5/96 Jun 3 1996 (1) Held safety meeting. Rig moved 100 %. RU Divertor. Tested Divertor. Held safety meeting. Held drill (Kick (well kill)). Made up BHA #1. Drilled to 230 ft. Jun 4 1996 (2) Held safety meeting. Drilled to 2221 ft. Circulated at 2221 ft. POOH to 265 ft. Serviced top drive. RIH to2221 ft. Drilled to 2410 ft. Jun 5 1996 (3) Held safety meeting. Held drill (H2S) Drilled to 4021 ft. Circulated at 4021 ft. POOH to 265 ft. Downloaded MWD too!. Serviced top drive. RIH to 4021 ft. Drilled to 4397 ft. Jun 6 1996 (4) Held safety meeting. Held drill (Fire). Drilled to 6002 ft. Circulated at 6002 ft. POOH to 2200 ft. Serviced top drive. RIH to 6002 ft. Drilled to 6753 ft. Jun 7 1996 (5) Held safety meeting. Held drill (Abandonment). Drilled to 7935 ft. Circulated at 7935 ft. POOH to 1100 ft. RIH to 7935 ft. Circulated at 7925 ft. Jun 8 1996 (6) Held safety meeting. Circulated at 7935 ft. POOH to 265 ft. Downloaded MWD tool. Serviced Drillfloor/Derrick. RU casing handling equipment. Ran casing to 7914 ft (9.625 in OD). Circulated at 7914 ft. Mixed and pumped slurry-741 bbl. Jun 9 1996 (7) Displaced slurry- 741 bbl. Mixed and pumped slurry - 58 bbl. Held safety meeting. RD Divertor. Installed casing spool. RU BOP stack. Tested BOP stack. Installed wear bushing. Made up BHA #3. Held drill (Kick while tripping). Serviced Block line. RIH to 6000 ft. Page Jun 10 1996 (8) Held safety meeting. RIH t/7828 ft. Tested casing. Drilled installed equipment - float collar. Performed formation integrity test, 12.4 ppg EMW. Held drill (H2S). Drilled to 10566 ft. Jun 11 1996 (9) Held safety meeting. Held drill (Kick while tripping). Drilled to 11237 ft. Circulated at 11237 ft. POOH to 7914 ft. RIH to 11237 ft. Drilled to 12738 ft. Jun 12 1996 (10) Held safety meeting. Held drill (Spill). Drilled to 14251 ft. Circulated at 14251 ft. POOH to 7914 ft. Jun 13 1996 (11) Held safety meeting. Serviced block line. Serviced top drive. RIH to 14251 ft. Drilled to 14438 ft. Circulated at 14438 ft. Drilled to 14627 ft. Held safety meeting. Drilled to 14941 ft. Circulated at 14941 ft. Flow check. POOH to 7914 ft. Flow check. RIH to 14941 ft. Circulated at 14941 ft. Jun 14 1996 (12) Held safety meeting. Circulated at 14941 ft. Took EMS survey at 14941 ft. POOH t/410 ft. Held safety meeting. Pull BHA. Retrieve bore protector. Test BOP stack. RU casing handling equipment. Held safety meeting. Ran casing to 4200 ft (7 in OD). Jun 15 1996 (13) Held safety meeting. Ran casing to 7900 ft (7 in OD). Circulated at 7900 ft. Held drill (Fire). Ran casing to 12900 ft (7 in OD). Held safety meeting. Held drill (Kick while tripping). Ran casing to 14915 ft (7 in OD). Circulated at 14915 ft. Held safety meeting. Mixed and pumped slurry - 48.7 bbl. Test casing. RD casing handling equipment. Installed seal assembly. Jun 16 1996 (14) Held safety meeting. Held drill (H2S). Installed seal assembly. RD BOP stack.. Installed Xmas tree primary components. Freeze protect well - 60 bbl of Diesel. Page 2 Milne Point Unit, Alaska TO: Steve Rossberg FROM: J. Fox Well Name: IMp F-18 Main Category: Ilnitiai Perf Sub Category: I'A' Sand Operation Date: 106 /18 - 20 / 96 Date: 106/20/96 Objective: Following the drilling of the well and in preparation for completion operations a gyro survey and primary correlation log need to be performed. The production casing adjacent to the Kup. 'A' sand then needs to be perforated and the SBHP measured. Sequence of Events: 0/18/96 0630 - MIRU Atlas E-Line unit. Makeup GR/CCL toolstring on open hole (0.455") wireline. Pwh = 0 psig. RIH. Magnetic marks on wireline are no longer detectable - Kup. bridge is not passable so wireline can not be re-marked or replaced. RIH to PBTD (14,806' wlm). Log up. Depth correct (36') to match MWD log at Kup. reservoir. Log GR / CCL back to surface. 1200 - MU and RIH w/GyroData gyro directional tool. RIH logging to PBTD. Log out of hole. ~ 06/19 0100 - Rig down for the night. Move off location for rig move on adjacent well (F-06). 0900 - Return to wellsite - wait for completion of rig move. RIH w! 20' perforating assembly (4.75" OD roller sub ! PFC (GR) ! CCL / 3 3/8" hollow carrier gun loaded w/22 gm. JumboJet charges). Correlate depth. Log into shooting depth (14,500' wlm). Detonate gun perforating casing from 14,502' to 14,522'. Log off and POOH. RIH w/identical perforating assembly except w/o PFC. Correlate depth. Log into shooting depth (14,480' wlm). Detonate gun perforating casing from 14,482' to 14,502'. Log off and POOH. RIH w/identical perforating except w/PFC. Correlate depth. Log into shooting depth (14,448' wlm). Detonate gun perforating casing from 14,450' to 14,470'. Log off and POOH. 2300 - Secure wellhead. Rig down for the night. 06/20 - 0630 - Re-rig up to wellhead. RIH w/identical perforating except w/16' hollow carrier gun. Correlate depth. Log into shooting depth (14,432' wlm). Detonate gun perforating casing from 14,434' to 14,450'. Log off and POOH. 1045 - MU HP pressure / temp. toolstring. RIH. Correlate depth and correct. Place pressure probe at 14,430' wlm (7175' TVD). Surface pressure :1400 psig ( from line displacement ). Bleed approx, one bbl. of volume to bleed tank. SBHP = 3485 psia. Monitor pressure for 50 minutes to allow the pressure to stabilize. Final pressure - 3497 psia w/pressure still increasing at a slow rate (pressure change over the last 10 min. = 0.72 psi and slowing with time). Final temp. = 175.7 deg. RIH to 14,530' (7246' TVD) to measure a SBHP - 3535.9 psia to measure fluid gradient. POOH. 0200- RDMO E-Line unit. Results: 1 .) A GP,/CCL correlation log was run from PBTD (14,806' wlm) to surface as a primary correlation log. It was logged all the way back to surface to provide a means to depth shift the MWD log. The intent was to use magnetically marked line to provide depth reference - unfortunately the magnetic marks were too weak to detect. This is the only marked E-Line on this side of the Kuparuk River. With the Kuparuk River still out there was no way to re-mark the line or get another unit. The best that could be done was to tie into the MWD log at the Kuparuk formation depth and use it as the depth reference. 2.) A gyro directional survey was run from surface to PBTD and then back out of the hole. 3.) The Kuparuk 'A' Sand was perforated w/22 gm. Jumbo Jet ("big hole") charges. See table below for specifics. With approval from Anchorage Engineering the bottom 4' of the original proposed interval was deleted to prevent an extra gun run. 4.) A SBHP survey was run to measure a pressure of 3497 psia (3512 psig) at a depth (just above top perf.) of 14,430' wlm (7175' TVD). This equates to a EMW of 9.41 ppg. The fluid density across the perforated interval was measured at 0.555 psi/ft. = 10.67 ppg. This is considerably higher than the seawater gradient expected. Tie in Iog/date_GR / CCL - 06/18/96 .......... Interval Measured Depth ......... Top Ft. Base Ft. Gun Diameter Shot Density Orientation Phasing 14,482' 14,522' 3 3/8" 6 random 135 / 45 22 gm. JumboJet charges (EHD = 0.76", TTP -- 6.4") BP EXPLORATION Mine Point Unit TO: S. Rossberg FROM: J. Fox DATE: 06/21/96 RE: MP F-18 SERVICE CO'S.: (ALASKA) INC. Data Frac / Frac BJ, Peak, VMS JOB SUMMARY DATA FRAC Bbls Bbls XL Time XL gel Final STP, ISIP, psi NWB Treat grad, Pumped gel to on perfs psi friction, psi/ft Perfs ~ psi 300 290 7. 2796 1990 100 0.71 FRA C Sand Lead prop Tail prop Design total Tresaver pumped, behind behind behind Liner rubber left Job was M# pipe, M# pipe, M# pipe, M# Sand, M# in hole? /size /size Flush 165 M # 154.1 M # not appl. 137 M # 10.9 M# no 16/20 Carbolite Ft of Estimated Final ISIP, psi ISIP Incr Actual TSO, TSO, ~sand in sand top STP, over sand:pad design, Nolte P i p e psi datafrac ratio m in P Iot 465' 14,330' 2490 2080 9 0 1 0.3 I I .3 .Operational problems None Comments Job went to flush. Dropped rate in half over the last 23 bbls in an attempt to induce a screenout with no response. There is evidence that TSO occurred. Wellbore is freeze protected w/80 bbl. of diesel. 6/25/96 2:55 PM DATA FRAC & FRAC SENT VIA MICROSOFT MAIL II DATE/TIME OPERATIONS SUMMARY I 06/21/96 DATA FRAC 0730 MIRU fmc fleet, vac trucks, crane. 1030 Pressure test treating lines to 6000 psig - OK. 1115 Hold pre-job safety meeting. 1128 Start data frac. 1138 Stage flush 1143 X.L. on perfs 1150 S/D Pumps - monitor falloff pressures. 06/21/96 FRAC 1400 Receive final frac design from Anchorage. 1418 Start pumping frac. 1420 Stage pad. 1433 Pad on perfs. 1449 Stage flush consisting of 100 X.L. gel, 80 bbl. diesel and remainder of seawater. 1501 Drop treating rate to 10 bpm. in an attempt to induce screen out, 1502 S/D pumps w/displacement 20 bbls. shy of perforations. PUMPING SUMMARY TIME RATE ANNP WHP I STAGE CUM COMMENTS BPM PSIG PSlGI BBL BBL 06/21/96 DATA FRAC 1128 0 150 226 0 0 Prepare to pump. 1129 40 224 2511 19 19 Rate established w/40 ppt gel w/FL 37 37 Start FL 40 40 Start XL 1130 41.0 2593 50/0 50 visc = 38 1131 2552 40 90 1132 41.2 214 2522 80 130 1134 38.3 174 2527 180 230 1137 41.3 175 2503 290 340 Cut XL 1141 40.7 175 2603 150 500 1143 40.7 175 2666 253 603 XL on perfs 1145 40.9 175 2785 329 680 1147 41.0 175 2813 750 1148 40.9 175 2810 450 800 1149 41.1 175 2800 500 850 1150 41.0 170 2796 543.7 894.6 S/D Pumps 1151 0 1975 ISIP = 1990 psig. Monitor falloff pressures. 1152 136 1947 PUMPING SUMMARY TIME RATE ANNP WHP STAGE CUM COMMENTS BPM PSlG PSlG BBL BBL 1153 1933 1155 1924 1157 1916 1220 102 1741 1228 102 1655 1243 92 1478 1418 0 73 852 0 0 Start pumping 141 9 40 3181 1 8 1 8 Rate established. 1420 40.7 2853 40/0 40 Stage pad 1422 40.9 146 2534 114 157 1424 40.8 136 2517 197 238 1425 39.8 131 2496 330 / 0 289 Stage I ppg. 1429 40.4 122 2521 163 450 1433 40.2 117 2518 610 Pad on perfs. !1436 40.0 122 2520 720 11439 40.2 2377 839 1443 38.9 2126 1010 Stage iO ppg. 1449 39.5 2022 /0 1215 Stage flush. Start displacement w/100 bbl. XL gel. 1451 43.0 107 241 9 1315 Switch from XL gel to seawater and blend in 80 bbl. of diesel. 1455 40.9 112 2755 1473 1458 40.9 113 2851 1575 I ppg on perfs 1500 40.7 2962 1672 1501 40/20 2660 1718 Drop rate to 20 bpm. 1502 23/0 88 2490 532 1741 S/D pumps. Monitor falloff pressures. ISIP = 2080 psig. 1504 0 2046 1741 Page 4 FLUIDS PUMPED DOWNHOLE INJTEST& DATA FRAC: 544 Bbls FRAC: 1741 Bbls 2285 TOTAL FLUIDS PUMPED DOWN HOLE LOAD VOLUME 80 Diesel to IA, tubing, or GC Diesel Recovered (not downhole) Total Diesel PETREDAT WINDOW IINONE GEL QUALITY CONTROL CHECK SEA H20 SEA H20 40# GEL 40# GEL PIPE XL XL pH TEMP pH VISCOSITY TIME TIME pH DF/FRAC 7 71 7.1 41 13.8 I '15 10.2 FLUID ADDITIVES BJ SPECTRA FRAC G4000 FLUID SYSTEM Gel: LFC - 10 ppt FLC - 41:40 ppt buffer: BF-8 - 3ppt Surfactant: NE 118 - 2 ppt X-Link: XLW-24 - 1.3 ppt Bacteriacide: X-cide Breaker: GBW-5, GBW-12, FR 300L SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: M P F- 1 8 Rig Name: Polar Rig #1 AFE: 3 3 7 0 2 7 Accept Date: 07/1 2/96 Spud Date: Release Date: 07/1 7/96 July 9 1996 RD and prepare to move to MPF-18. July 10 1996 Unable to RU on MPF-18, rig 22E having problems with surface cementing operations. Divert line from 22E aimed at area needed to RU Polar equipment. July 11 1996 Cont to standby until 22E is finished with divert line. Unload 2-7/8" tubing. MIRU. Notify State for BOPE test. July 12 1996 Cont to RU. HB&R arrive. Unload brine. State waived right to attenc BOPE test, J. Spaulding. Land test plug. Start BOPE test. Repair leaks. Start to record BOPE test, ok. Pull test plug. Rig accepted 07/12/96 @ 1200 hrs. Pressure test casing/Baker bridge plug to 3000 psi, ok. MU retrieving head. Tally and start to PU 2-7/8" tubing. Cont PU tubing. Have 360 jts in hole. July 13 1996 Cont to PU 2-7/8" tubing. Tag Baker bridge plug at 14201' pipe tally. Unable to latch. RU to wash over fishing neck. Washed over FN and latch BP. Push down hole below setting depth. Monitor for flow-none. Pull up hole-did not see normal release. Drop down hole again. Monitor for any flow. Start out of hole with BP, standing tubing in derrick. Spot spooling unit. Finish out of hole with tubing and BP. MU BHA #2. Service rig. Start TIH with BHA #2 for clean out trip. PU singles and tag TOS at 14497'. Pull up hole. RU to reverse circ and WO trucks to arrive on location. Circ down to 14561'. Lost all returns-tubing plugged. Work to open tubing. Tubing now partly plugged, but tubing starting to become stuck. Work struck pipe. Pipe now free. Pull 12 jts. Pump down tubing. Tubing now clear. Discuss options. Page ] July 14 1996 Run back to TOS and cont to reverse out carb at a slow penetration rate. Fluid loss has slowed down. Xanvis/LC sweep at perfs. Carb returns to surface. Tagged hard bottom at 14828'. CBU. LD 14 jts. End of tubing now at 14402'. WO clean brine to displace well. RU Mi filter unit. Spot brine trucks. Start to swap well over to clean brine. Have hole turned over. Return fluids fairly clear but getting back course LCM. Cont to circ. Still getting LCM. Run out of brine & returns room in rig tank. WO on brine and haul returns away. 9.5# brine on location, pump to catch fluid. Cont to reverse circ well. Returns stil contain large amount of LCM. SD to talk to mudman and discuss with engineer in town. July 15 1996 Discuss problem with lead engineer and decide on a way forward. Have Baroid mud engineer work samples. Order extra brine. Brine arrives on location. Cont to reverse well. PU extra tubing and wash through perfs and into the sump. End of tubing at 14685'. Reverse three tubing volumes. Still getting some LCM and dirty brine. SD pump and pull tubing back up above perfs. End of tubing 14402'. Cont to reverse circ wellbore. Hole again swapped over to clean brine. Returns look good. ESP supervisor witnessed sample at end, ok. Decide to reverse one more tubing volume. Fluid clean. Monitor well. RD MI filter van. RU to trip tubing. LD 6 its. Start out of hole-standing remaining tubing in derrick. LD BHA #2. RU to run ESP equpment. July 16 1996 RU to run ESP completion. TIH with ESP completion. Make splice at 7810'. TIH with ESP completion. Total 447 jts tubing run. RU hanger and splice in pigtail. Landed completion string. ND BOP's. Install production tree. PT the 7-1/16" flange and hanger to 5000 psi. July 17 1996 Installed tree and PT to 5000 psi for 10 min, ok. Rig released 07/17/96 @ 0800 hrs. Page 2 SPE' '-SUN DRILLING SERVICES ANCHORAGE ALASKA BP EXPLORATION (ALASKA),INC. MILNE POINT / MPF-18 500292268100 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/15/96 DATE OF SURVEY: 061296 MWD SURVEY JOB NUMBER: AK-MM-960630 KELLY BUSHING ELEV. = 40.65 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. .00 .00 -40.65 0 177.51 177.51 136.86 0 264.80 264.79 224.14 0 352.72 352.71 312.06 0 444.24 444.22 403.57 0 0 36 25 47 7 N .00 E .00 .00N .00E N 1.39 E .34 .93N .02E S 56.71 E 1.04 1.21N .31E S 45.96 E .43 .60N 1.02E S 88.85 E .77 .16N 1.58E .00 .74 .81 -.10 -.78 536.62 536.59 495.94 0 626.09 626.03 585.38 1 716.37 716.20 675.55 3 807.50 807.10 766.45 4 897.88 897.08 856.43 6 58 59 34 26 13 N 42.99 W 1.16 .74N 1.14E N 49.00 W 1.14 2.32N .55W N 44.87 W 1.77 5.34N 3.72W N 40.56 W 1.01 10.05N 8.03W N 39.21 W 1.97 16.51N 13.41W -.06 2.21 6.51 12.84 21.22 988.69 987.06 946.41 9 1084.41 1081.19 1040.54 11 1179.88 1174.45 1133.80 13 1275.43 1267.04 1226.39 15 1368.76 1356.40 1315.75 18 10 33 5 25 4 N 41.92 W 3.27 25.72N 21.37W N 45.00 W 2.55 38.18N 33.25W N 45.58 W 1.61 52.51N 47.73W N 43.36 W 2.51 69.33N 64.19W N 42.22 W 2.85 89.08N 82.44W 33.34 50.38 70.45 93.69 120.36 1464.99 1447.31 1406.66 1559.19 1535.21 1494.56 1654.15 1622.33 1581.68 1749.74 1708.10 1667.45 1843.31 1790.38 1749.73 20 21 24 27 29 10 54 57 25 24 N 40.56 W 2.26 112.74N 103.27W N 39.78 W 1.86 138.59N 125.08W N 38.72 W 3.24 167.85N 148.95W N 36.48 W 2.78 201.29N 174.66W N 35.64 W 2.16 237.29N 200.86W 151.70 185.41 223.08 265.24 309.76 1937.07 1871.72 1831.07 30 2032.64 1953.13 1912.48 32 2127.24 2030.98 1990.33 36 2222.58 2106.82 2066.17 38 2316.65 2179.64 2138.99 40 14 55 17 16 15 N 35.19 W .92 275.30N 227.88W N 34.66 W 2.82 316.33N 256.53W N 33.17 W 3.68 360.93N 286.47W N 33.41 W 2.08 409.20N 318.18W N 33.43 W 2.09 458.89N 350.96W 356.39 406.43 460.14 517.85 577.35 2411.47 2251.14 2210.49 41 2507.69 2321.58 2280.93 44 2603.26 2389.27 2348.62 45 2698.45 2454.95 2414.30 46 2791.12 2517.47 2476.82 48 50 1 46 57 10 .N 31.99 W 1.95 511.28N 384.59W N 31.71 W 2.27 566.94N 419.17W N 32.53 W 1.94 624.06N 455.04W N 32.32 W 1.25 682.21N 491.98W N 32.40 W 1.31 739.98N 528.58W 639.53 704.93 772.28 841.08 909.38 2885.30 2578.81 2538.16 2979.28 2636.45 2595.80 3072.85 2690.52 2649.87 3167.45 2742.68 2702.03 3261.77 2791.79 2751.14 5O 53 55 57 59 31 48 34 30 43 N 33.70 W 2.72 799.85N 567.55W N 33.75 W 3.49 861.58N 608.76W N 35.16 W 2.25 924.52N 651.96W N 36.15 W 2.22 988.63N 697.96W N 36.67 W 2.41 1053.42N 745.75W 980.75 1054.94 1131.28 1210.18 1290.67 .~ov I~ '119911 Anchorage SPE !-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA),INC. MILNE POINT / MPF-18 500292268100 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/15/96 DATE OF SURVEY: 061296 MWD SURVEY JOB NUMBER: AK-MM-960630 KELLY BUSHING ELEV. = 40.65 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 3357.04 2837.95 2797.30 3452.26 2880.63 2839.98 3546.48 2920.08 2879.43 3642.47 2959.06 2918.41 3737.35 2996.62 2955.97 COURS INCLN DG MN 62 18 64 24 66 5 65 59 67 21 COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST N 36.68 W 2.71 1120.25N 795.52W N 37.32 W 2.29 1188.21N 846.74W N 37.50 W 1.79 1256.17N 898.71W N 36.44 W 1.01 1326.25N 951.46W N 37.56 W 1.81 1395.82N 1003.90W VERT. SECT. 1373.98 1459.04 1544.54 1632.22 1719.30 3832.71 3032.63 2991.98 3926.99 3067.93 3027.28 4021.13 3103.16 3062.51 4115.49 3137.99 3097.34 4210.73 3172.37 3131.72 68 16 67 45 68 18 68 22 69 17 N 38.52 W 1.33 1465.36N 1058.31W N 38.84 W .64 1533.60N 1112.94W N 37.47 W 1.47 1602.25N 1166.87W N 37.84 W .37 1671.68N 1220.44W N 36.51 W 1.62 1742.44N 1274.10W 1807.50 1894.77 1981.96 2069.59 2158.35 4304.32 3205.55 3164.90 69 10 4397.94 3238.83 3198.18 69 10 4490.93 3271.69 3231.04 69 25 4585.34 3304.83 3264.18 69 28 4676.34 3336.91 3296.26 69 15 N 37.80 W 1.29 1812.18N 1326.95W N 37.41 W .39 1881.51N 1380.35W N 36.25 W 1.20 1951.13N 1432.49W N 36.52 W .27 2022.30N 1484.93W N 36.29 W .34 2090.84N 1535.47W 2245.81 2333.25 2420.21 2508.60 2593.74 4771.68 3370.73 3330.08 4865.50 3404.54 3363.89 4962.04 3440.07 3399.42 5057.01 3475.59 3434.94 5152.00 3511.50 3470.85 69 11 68 33 68 15 67 48 67 45 N 35.65 W .63 2162.98N 1587.83W N 34.93 W .98 2234.41N 1638.39W N 35.51 W .64 2307.74N 1690.15W N 36.12 W .76 2379.16N 1741.69W N 34.45 W 1.63 2450.94N 1792.49W 2682.87 2770.38 2860.15 2948.22 3036.15 5247.20 3547.84 3507.19 67 22 5342.05 3583.88 3543.23 67 57 5434.61 3618.62 3577.97 67 56 5530.91 3654.94 3614.29 67 44 5624.72 3689.58 3648.93 68 54 N 33.62 W .90 2523.86N 1841.73W N 34.01 W .73 2596.75N 1890.56W N 33.90 W .11 2667.91N 1938.48W N 33.63 W .34 2742.06N 1988.05W N 34.08 W 1.32 2814.45N 2036.61W 3124.12 3211.82 3297.59 3386.74 3473.88 5717.38 3723.20 3682.55 5815.77 3759.79 3719.14 5909.48 3795.78 3755.13 5997.99 3829.12 3788.47 6092.22 3863.75 3823.10 68 33 67 46 67 3 68 41 68 10 N 34.70 W .73 2885.70N 2085.38W N 34.09 W .97 2961.06N 2136.98W N 32.95 W 1.37 3033.19N 2184.75W N 33.07 W 1.86 3101.94N 2229.42W N 33.58 W .74 3175.16N 2277.56W 3560.22 3651.53 3738.01 3819.92 3907.50 6188.26 3899.89 3859.24 6282.82 3935.19 3894.54 6376.42 3968.37 3927.72 6471.53 4000.65 3960.00 6564.97 4032.13 3991.48 67 36 68 33 69 55 70 24 70 13 N 31.38 W 2.20 3250.20N 2325.34W N 32.50 W 1.48 3324.64N 2371.74W N 33.34 W 1.69 3398.10N 2419.31W N 34.24 W 1.02 3472.45N 2469.06W N 33.64 W .63 3545.43N 2518.18W 3996.35 4083.91 4171.34 4260.77 4348.72 SPF :-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA),INC. MILNE POINT / MPF-18 500292268100 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/15/96 DATE OF SURVEY: 061296 MWD SURVEY JOB NUMBER: AK-MM-960630 KELLY BUSHING ELEV. = 40.65 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6660.28 4064.59 4023.94 69 6752.95 4096.37 4055.72 69 6846.63 4128.35 4087.70 70 6943.28 4161.57 4120.92 69 7032.57 4192.71 4152.06 69 56 55 9 38 32 N 33.07 W .63 3620.28N 2567.45W N 35.19 W 2.15 3692.33N 2616.28W N 36.41 W 1.25 3763.74N 2667.79W N 37.40 W 1.10 3836.31N 2722.29W N 36.20 W 1.26 3903.32N 2772.41W 4438.27 4525.29 4613.33 4704.06 4787.71 7127.15 4226.30 4185.65 7223.25 4261.46 4220.81 7317.26 4295.83 4255.18 7412.74 4329.95 4289.30 7506.80 4363.82 4323.17 68 68 68 69 68 51 13 53 13 33 N 36.37 W .74 3974.59N 2824.74W N 36.51 W .68 4046.54N 2877.86W N 36.16 W .79 4117.02N 2929.70W N 36.34 W .40 4188.94N 2982.43W N 35.88 W .85 4259.83N 3034.15W 4876.11 4965.53 5053.02 5142.18 5229.92 7602.30 4399.20 4358.55 7696.82 4434.09 4393.44 7790.93 4467.44 4426.79 7842.56 4485.18 4444.53 7949.54 4522.09 4481.44 67 68 69 70 69 56 43 46 2 35 N 35.75 W .65 4331.76N 3086.05W N 35.71 W .82 4403.06N 3137.35W N 35.17 W 1.24 4474.76N 3188.37W N 35.76 W 1.19 4514.25N 3216.51W N 36.38 W .69 4595.41N 3275.62W 5318.62 5406.46 5494.46 5542.95 5643.35 8012.16 4544.23 4503.58 69 8103.93 4577.47 4536.82 68 8194.75 4610.89 4570.24 68 8290.63 4645.94 4605.29 68 8387.68 4681.52 4640.87 68 0 31 17 49 10 N 36.29 W .95 4642.60N 3310.33W N 36.56 W .58 4711.42N 3361.12W N 36.96 W .49 4779.08N 3411.66W N 38.24 W 1.36 4849.78N 3466.10W N 38.92 W .93 4920.36N 3522.41W 5701.91 5787.44 5871.86 5961.02 6051.17 8484.74 4717.52 4676.87 8577.84 4751.28 4710.63 8674.95 4786.48 4745.83 8770.67 4822.62 4781.97 8865.73 4858.23 4817.58 68 69 68 67 68 17 10 18 19 39 N 37.43 W 1.43 4991.22N 3578.12W N 36.37 W 1.43 5060.59N 3630.20W N 36.73 W .96 5133.30N 3684.10W N 37.46 W 1.24 5203.99N 3737.55W N 36.31 W 1.79 5274.48N 3790.44W 6141.19 6227.92 6318.40 6406.99 6495.08 8960.69 4892.71 4852.06 9052.05 4926.17 4885.52 9148.90 4961.42 4920.77 9243.97 4994.80 4954.15 9337.97 5027.65 4987.00 68 68 69 69 69 46 15 3 5O 14 N 36.09 W .24 5345.88N 3842.70W N 36.42 W .65 5414.44N 3892.98W N 35.32 W 1.34 5487.53N 3945.83W N 33.88 W 1.64 5560.80N 3996.37W N 33.85 W .64 5633.93N 4045.44W 6583.56 6668.56 6758.75 6847.75 6935.79 9430.78 5061.00 5020.35 9523.90 5095.47 5054.82 9617.48 5129.80 5089.15 9712.33 5163.02 5122.37 9807.08 5196.06 5155.41 68 67 69 69 69 39 53 4 55 15 N 33.98 W .65 5705.80N 4093.77W N 33.95 W .82 5777.55N 4142.10W N 34.34 W 1.32 5849.59N 4190.96W N 35.05 W 1.14 5922.63N 4241.53W N 34.72 W .77 5995.47N 4292.31W 7022.38 7108.85 7195.89 7284.72 7373.51 SPE' :-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA),INC. MILNE POINT / MPF-18 500292268100 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/15/96 DATE OF SURVEY: 061296 MWD SURVEY JOB NUMBER: AK-MM-960630 KELLY BUSHING ELEV. = 40.65 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9900.81 5230.18 5189.53 9992.92 5263.83 5223.18 10089.87 5298.97 5258.32 10183.11 5333.39 5292.74 10277.20 5367.42 5326.77 68 3 69 5 68 24 68 15 69 19 N 34.55 W 1.30 6067.30N 4341.93W N 34.67 W 1.14 6137.86N 4390.63W N 34.85 W .72 6212.10N 4442.14W N 34.18 W .69 6283.50N 4491.24W N 34.71 W 1.25 6355.83N 4540.85W 7460.80 7546.53 7636.88 7723.53 7811.23 10371.03 5400.97 5360.32 10465.96 5434.73 5394.08 10559.97 5468.13 5427.48 10655.08 5502.87 5462.22 10750.60 5537.21 5496.56 68 46 69 34 68 48 68 21 69 30 N 35.39 W .90 6427.57N 4591.18W N 35.49 W .85 6499.85N 4642.62W N 35.62 W .83 6571.34N 4693.72W N 35.52 W .47 6643.36N 4745.22W N 34.96 W 1.31 6716.15N 4796.65W 7898.85 7987.58 8075.45 8163.99 8253.12 10844.99 5570.67 5530.02 10940.48 5603.95 5563.30 11033.99 5636.03 5595.38 11128.22 5667.94 5627.29 11217.16 5697.52 5656.87 68 58 70 13 69 39 70 45 70 22 N 34.45 W .76 6788.71N 4846.90W N 34.27 W 1.33 6862.59N 4897.41W N 34.81 W .82 6934.94N 4947.21W N 35.69 W 1.47 7007.34N 4998.38W N 33.85 W 2.00 7076.23N 5046.21W 8341.37 8430.85 8518.68 8607.33 8691.19 11312.41 5728.51 5687.86 71 39 11408.13 5759.11 5718.46 71 3 11503.54 5790.63 5749.98 70 20 11593.86 5821.53 5780.88 69 39 11686.97 5854.28 5813.63 69 9 N 32.86 W 1.66 7151.46N 5095.72W N 32.45 W .74 7227.81N 5144.66W N 32.80 W .82 7303.65N 5193.21W N 33.20 W .88 7374.83N 5239.43W N 33.04 W .55 7447.83N 5287.05W 8781.20 8871.79 8961.73 9046.53 9133.63 11782.09 5888.46 5847.81 68 43 11876.01 5922.13 5881.48 69 15 11969.80 5955.64 5914.99 68 52 12065.11 5990.15 5949.50 68 40 12159.75 6023.76 5983.11 69 42 N 33.95 W 1.01 7521.85N 5336.04W N 34.98 W 1.17 7594.14N 5385.65W N 34.17 W .91 7666.26N 5435.36W N 35.28 W 1.10 7739.28N 5485.97W N 36.27 W 1.46 7811.05N 5537.69W 9222.34 9310.00 9397.59 9486.42 9574.88 12252.83 6056.13 6015.48 69 35 12347.01 6089.36 6048.71 69 5 12441.48 6122.75 6082.10 69 30 12536.85 6155.93 6115.28 69 46 12629.44 6188.04 6147.39 69 39 N 35.52 W .77 7881.74N 5588.85W N 36.54 W 1.14 7953.01N 5640.68W N 35.66 W .98 8024.41N 5692.75W N 36.27 W .66 8096.77N 5745.26W N 37.23 W .98 8166.36N 5797.22W 9662.15 9750.26 9838.62 9928.03 10014.84 12724.84 6221.25 6180.60 12820.43 6254.96 6214.31 12914.96 6288.66 6248.01 13010.59 6324.70 6284.05 13104.10 6363.74 6323.09 69 35 69 6 69 7 66 35 64 2 N 37.71 W .47 8237.33N 5851.62W N 38.46 W .90 8307.74N 5906.80W N 39.45 W .98 8376.42N 5962.32W N 37.97 W 3.00 8445.52N 6017.72W N 37.24 W 2.83 8512.83N 6069.57W 10104.21 10193.56 10281.70 10370.12 10455.01 SPE~---~.~-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA),INC. MILNE POINT / MPF-18 500292268100 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/15/96 DATE OF SURVEY: 061296 MWD SURVEY JOB NUMBER: AK-MM-960630 KELLY BUSHING ELEV. = 40.65 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 13198.64 6406.41 6365.76 62 17 N 35.49 W 2.48 8580.74N 13294.20 6451.24 6410.59 61 45 N 33.73 W 1.72 8650.19N 13387.90 6496.89 6456.24 59 55 N 33.30 W 2.00 8718.40N 13481.50 6545.09 6504.44 58 4 N 33.96 W 2.06 8785.19N 13576.54 6596.86 6556.21 55 53 N 34.30 W 2.32 8851.15N 6119.58W 10539.34 6167.51W 10623.72 6212.69W 10705.49 6257.11W 10785.67 6301.82W 10865.33 13670.62 6651.37 6610.72 53 17 N 34.99 W 2.83 8914.23N 13765.47 6709.46 6668.81 51 9 N 34.44 W 2.29 8975.84N 13858.65 6768.99 6728.34 49 24 N 34.53 W 1.88 9034.92N 13952.58 6831.65 6791.00 46 52 N 34.31 W 2.70 9092.61N 14045.73 6896.75 6856.10 44 25 N 34.77 W 2.66 9147.47N 6345.40W 10942.00 6388.09W 11016.95 6428.67W 11088.61 6468.21W 11158.54 6505.96W 11225.13 14141.60 6964.79 6924.14 45 9 N 34.75 W .77 9202.96N 14234.83 7030.38 6989.73 45 25 N 35.58 W .69 9257.12N 14327.02 7095.18 7054.53 45 15 N 35.88 W .29 9310.35N 14423.68 7163.50 7122.85 44 47 N 36.50 W .66 9365.54N 14518.91 7230.53 7189.88 45 43 N 36.49 W .98 9419.91N 6544.47W 11292.67 6582.62W 11358.92 6620.92W 11424.49 6661.29W 11492.86 6701.52W 11560.49 14613.44 7296.24 7255.59 46 12 N 36.80 W .56 9474.43N 14708.76 7362.04 7321.40 46 29 N 37.09 W .38 9529.55N 14802.72 7426.90 7386.25 46 13 N 37.87 W .67 9583.50N 14834.39 7448.80 7408.15 46 15 N 37.67 W .47 9601.58N 14941.00 7522.51 7481.86 46 15 N 37.67 W .00 9662.55N 6742.07W 11628.42 6783.53W 11697.36 6824.90W 11765.30 6838.91W 11788.16 6885.98W 11865.12 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 11865.14 FEET AT NORTH 35 DEG. 28 MIN. WEST AT MD = 14941 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 324.64 DEG. PROJECTED SURVEY AT 14941.00' MD SPF Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA),INC. MILNE POINT / MPF-18 500292268100 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/15/96 DATE OF SURVEY: 061296 JOB NUMBER: AK-MM-960630 KELLY BUSHING ELEV. = 40.65 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -40.65 1000.00 998.22 957.57 2000.00 1925.59 1884.94 3000.00 2648.68 2608.03 4000.00 3095.34 3054.70 .00 N .00 E 27.06 N 22.57 W 301.94 N 246.54 W 875.48 N 618.05 W 1586.66 N 1154.92 W .00 1.78 1.78 74.41 72.63 351.32 276.91 904.66 553.33 5000.00 3454.13 3413.48 6000.00 3829.85 3789.20 7000.00 4181.33 4140.68 8000.00 4539.87 4499.22 9000.00 4906.94 4866.29 2336.44 N 3103.50 N 3878.69 N 4633.45 N 5375.49 N 1710.64 W 1545.87 641.22 2230.44 W 2170.15 624.28 2754.39 W 2818.67 648.52 3303.61 W 3460.13 641.45 3864.29 W 4093.06 632.93 10000.00 5266.36 5225.71 11000.00 5624.21 5583.56 12000.00 5966.53 5925.88 13000.00 6320.51 6279.86 14000.00 6864.09 6823.44 6143.30 N 6908.78 N 7689.57 N 8437.86 N 9121.18 N 4394.39 W 4733.64 640.58 4929.02 W 5375.79 642.15 5451.18 W 6033.47 657.68 6011.72 W 6679.49 646.02 6487.71 W 7135.91 456.42 14941.00 7522.51 7481.86 9662.55 N 6885.98 W 7418.49 282.58 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPF 'f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA),INC. MILNE POINT / MPF-18 500292268100 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/15/96 DATE OF SURVEY: 061296 JOB NUMBER: AK-MM-960630 KELLY BUSHING ELEV. = 40.65 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -40.65 40.65 40.65 .00 140.65 140.65 100.00 240.66 240.65 200.00 340.66 340.65 300.00 .00 N .00 E .00 .00 N .00 E .00 .00 .54 N .01 E .00 .00 .31 N .16 E .01 .00 .72 N .90 E .01 .01 440.67 440.65 400.00 540.68 540.65 500.00 640.72 640.65 600.00 740.87 740.65 700.00 841.15 840.65 800.00 2 6 12 .16 N 1.57 .79 N 1.10 .65 N .93 .43 N 4.80 .04 N 9.73 E .02 .00 E .03 .01 W .07 .04 W .22 .15 W .50 .28 941.78 940.65 900.00 1043.03 1040.65 1000.00 1145.17 1140.65 1100.00 1248.05 1240.65 1200.00 1352.22 1340.65 1300.00 20 32 47 64 85 .57 N 16.83 .32 N 27.38 .01 N 42.12 .03 N 59.19 .35 N 79.05 W 1.13 .63 W 2.38 1.25 W 4.52 2.15 W 7.40 2.88 W 11.57 4.17 1457.90 1440.65 1400.00 1565.06 1540.65 1500.00 1674.41 1640.65 1600.00 1786.43 1740.65 1700.00 1901.11 1840.65 1800.00 110 140 174 214 260 .88 N 101.67 .30 N 126.49 .62 N 154.32 .92 N 184.73 .49 N 217.44 W 17.25 5.68 W 24.41 7.16 W 33.76 9.35 W 45.78 12.03 W 60.46 14.67 2017.82 1940.65 1900.00 2139.24 2040.65 2000.00 2265.76 2140.65 2100.00 2397.39 2240.65 2200.00 2534.21 2340.65 2300.00 309 366 431 503 582 .75 N 251.97 .88 N 290.36 .60 N 332.95 .31 N 379.62 .61 N 428.85 W 77.17 16.71 W 98.59 21.43 W 125.11 26.52 W 156.73 31.62 W 193.56 36.82 2677.50 2440.65 2400.00 2825.90 2540.65 2500.00 2986.40 2640.65 2600.00 3163.67 2740.65 2700.00 3362.86 2840.65 2800.00 669 761 866 986 1124 .28 N 483.79 .87 N 542.48 .36 N 611.95 .06 N 696.08 .39 N 798.60 W 236.85 43.30 W 285.25 48.39 W 345.75 60.51 W 423.02 77.27 W 522.21 99.19 3597.22 2940.65 2900.00 3854.38 3040.65 3000.00 4122.72 3140.65 3100.00 4403.07 3240.65 3200.00 4686.90 3340.65 3300.00 1293.02 1481.10 1676.98 1885.31 2098.80 N 926.89 N 1070.84 N 1224.57 N 1383.26 N 1541.32 W 656.57 134.37 W 813.73 157.15 W 982.07 168.35 W 1162.42 180.34 W 1346.25 183.84 SPE" ~.~-SUN DRILLING SERVICES ANCHOP~AGE ALASKA PAGE BP EXPLORATION (ALASKA),INC. MILNE POINT / MPF-18 500292268100 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/15/96 DATE OF SURVEY: 061296 JOB NUMBER: AK-MM-960630 KELLY BUSHING ELEV. = 40.65 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 4963.61 3440.65 3400.00 5228.52 3540.65 3500.00 5493.19 3640.65 3600.00 5764.99 3740.65 3700.00 6029.72 3840.65 3800.00 2308.93 N 1691.00 W 2509.50 N 1832.19 W 2712.99 N 1968.71 W 2922.14 N 2110.57 W 3126.71 N 2245.55 W 1522.96 176.71 1687.87 164.91 1852.54 164.66 2024.34 171.81 2189.07 164.73 6297.74 3940.65 3900.00 6590.16 4040.65 4000.00 6882.83 4140.65 4100.00 7166.90 4240.65 4200.00 7442.91 4340.65 4300.00 3336.35 N 2379.21 W 3565.17 N 2531.31 W 3791.13 N 2688.01 W 4004.43 N 2846.72 W 4211.66 N 2999.15 W 2357.09 168.02 2549.51 192.42 2742.18 192.67 2926.25 184.07 3102.26 176.02 7714.89 4440.65 4400.00 8002.17 4540.65 4500.00 8275.98 4640.65 4600.00 8547.93 4740.65 4700.00 8817.54 4840.65 4800.00 4416.74 N 3147.18 W 4635.07 N 3304.81 W 4839.05 N 3457.65 W 5038.08 N 3613.62 W 5238.35 N 3763.84 W 3274.24 171.98 3461.52 187.27 3635.33 173.82 3807.28 171.95 3976.89 169.61 9091.15 4940.65 4900.00 9374.63 5040.65 5000.00 9647.86 5140.65 5100.00 9928.82 5240.65 5200.00 10202.71 5340.65 5300.00 5443.66 N 3914.54 W 5662.40 N 4064.54 W 5873.02 N 4206.96 W 6088.70 N 4356.66 W 6298.56 N 4501.47 W 4150.50 173.61 4333.98 183.48 4507.21 173.22 4688.17 180.96 4862.06 173.89 10482.93 5440.65 5400.00 10760.44 5540.65 5500.00 11047.29 5640.65 5600.00 11350.98 5740.65 5700.00 11648.66 5840.65 5800.00 6512.80 N 4651.86 W 6723.71 N 4801.93 W 6945.18 N 4954.33 W 7182.21 N 5115.58 W 7417.82 N 5267.53 W 5042.28 180.22 5219.79 177.51 5406.64 186.85 5610.33 203.69 5808.01 197.68 11928.18 5940.65 5900.00 12208.42 6040.65 6000.00 12492.70 6140.65 6100.00 12780.31 6240.65 6200.00 13049.86 6340.65 6300.00 7634.15 N 5413.54 W 7847.89 N 5564.63 W 8063.36 N 5720.78 W 8278.39 N 5883.48 W 8473.87 N 6039.71 W 5987.53 179.52 6167.77 180.24 6352.05 184.28 6539.66 187.61 6709.21 169.55 13271.83 6440.65 6400.00 13473.11 6540.65 6500.00 13652.55 6640.65 6600.00 13814.98 6740.65 6700.00 13965.75 6840.65 6800.00 8633.79 N 6156.57 W 8779.28 N 6253.13 W 8902.30 N 6337.07 W 9007.54 N 6409.84 W 9100.55 N 6473.62 W 6831.18 121.97 6932.46 101.28 7011.90 79.44 7074.33 62.43 7125.10 50.76 SPF'~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA),INC. MILNE POINT / MPF-18 500292268100 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/15/96 DATE OF SURVEY: 061296 JOB NUMBER: AK-MM-960630 KELLY BUSHING ELEV. = 40.65 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 14107.37 6940.65 6900.00 9183.01 N 6530.63 W 7166.72 41.62 14249.46 7040.65 7000.00 9265.60 N 6588.69 W 7208.82 42.10 14391.49 7140.65 7100.00 9347.31 N 6647.80 W 7250.84 42.02 14533.40 7240.65 7200.00 9428.25 N 6707.69 W 7292.75 41.91 14677.68 7340.65 7300.00 9511.57 N 6769.94 W 7337.03 44.28 14822.60 7440.65 7400.00 9594.84 N 6833.70 W 7381.95 44.92 14941.00 7522.51 7481.86 9662.55 N 6885.98 W 7418.49 36.54 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS SP5 £-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION MILNE POINT/MPF-18 500292268100 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/16/96 DATE OF SURVEY: 061396 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-60075 KELLY BUSHING ELEV. = 40.65 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 7842.56 4485.39 4444.74 7938.88 4519.06 4478.41 8103.90 4578.66 4538.01 8127.58 4587.29 4546.64 8221.93 4621.74 4581.09 7O 69 68 68 68 2 N 35.76 W .00 4514.43N 3216.63W 2 N 36.12 W 1.10 4587.49N 3269.60W 36 N 36.17 W .26 4711.75N 3360.36W 39 N 36.34 W .69 4729.53N 3373.40W 30 N 36.30 W .16 4800.30N 3425.43W 5543.02 5633.26 5787.13 5809.19 5897.02 8316.28 4656.16 4615.51 68 42 8410.63 4690.41 4649.76 68 44 8504.97 4724.25 4683.60 69 12 8599.32 4757.83 4717.18 69 5 8693.67 4792.40 4751.75 67 55 N 37.92 W 1.61 4870.35N 3478.43W N 36.54 W 1.36 4940.35N 3531.61W N 36.32 W .55 5011.20N 3583.91W N 36.17 W .19 5082.31N 3636.04W N 38.99 W 3.04 5151.88N 3689.56W 5984.84 6072.73 6160.78 6248.95 6336.69 8788.02 4827.44 4786.79 68 28 8882.37 4861.98 4821.33 68 34 8976.72 4896.20 4855.55 68 53 9071.07 4929.27 4888.62 70 4 9165.42 4961.44 4920.79 70 4 N 37.78 W 1.32 5220.54N 3743.95W N 36.14 W 1.62 5290.69N 3796.74W N 35.79 W .49 5361.85N 3848.37W N 34.01 W 2.16 5434.32N 3898.91W N 34.01 W .02 5507.85N 3948.52W 6424.21 6511.98 6599.90 6688.24 6776.89 9259.77 4993.80 4953.15 9354.12 5026.82 4986.17 9448.47 5060.81 5020.16 9542.82 5095.02 5054.37 9637.17 5129.00 5088.35 69 48 N 33.79 W .35 5581.41N 3997.95W 69 13 N 33.84 W .62 5654.84N 4047.14W 68 32 N 34.06 W .75 5727.85N 4096.29W 68 55 N 33.98 W .41 5800.73N 4145.48W 68 51 N 34.18 W .21 5873.64N 4194.80W 6865.46 6953.79 7041.75 7129.63 7217.60 9731.51 5162.66 5122.01 69 19 9825.87 5196.18 5155.53 69 3 9920.22 5230.24 5189.59 68 36 10014.57 5264.29 5223.64 69 4 10108.92 5297.88 5257.23 69 12 N 34.45 W .55 5946.42N 4244.48W N 34.68 W .35 6019.06N 4294.53W N 34.92 W .53 6091.31N 4344.74W N 34.77 W .52 6163.52N 4395.01W N 34.64 W .19 6236.01N 4445.22W 7305.70 7393.88 7481.85 7569.83 7657.98 10203.27 5330.94 5290.29 69 45 10297.62 5363.85 5323.20 69 25 10391.97 5396.64 5355.99 69 53 10486.32 5429.27 5388.62 69 38 10580.67 5462.69 5422.04 68 51 N 34.46 W .61 6308.79N 4495.33W N 34.87 W .54 6381.52N 4545.62W N 35.16 W .58 6453.97N 4596.38W N 35.03 W .30 6526.41N 4647.27W N 35.05 W .83 6598.65N 4697.93W 7746.32 7834.72 7923.17 8011.70 8099.92 10675.02 5496.32 5455.67 69 22 10769.37 5529.33 5488.68 69 40 10863.72 5561.95 5521.30 69 52 10958.07 5593.99 5553.34 70 24 11052.42 5625.48 5584.83 70 35 N 34.17 W 1.03 6671.20N 4747.99W N 34.01 W .36 6744.40N 4797.53W N 33.32 W .71 6818.09N 4846.60W N 33.23 W .57 6892.28N 4895.29W N 33.22 W .19 6966.68N 4944.02W 8188.04 8276.38 8364.85 8453.50 8542.34 RECEIVED NOV P~ I 1996 Alaska 011 & Gas Cons. CommissioD Anchorage SPT Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION MILNE POINT/MPF-18 500292268100 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/16 /96 DATE OF SURVEY: 061396 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-60075 KELLY BUSHING ELEV. = 40.65 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 11146.77 5656.43 5615.78 71 6 11241.12 5687.55 5646.90 70 22 11335.47 5718.40 5677.75 71 26 11429.82 5748.87 5708.22 70 52 11524.17 5780.29 5739.64 70 13 N 33.02 W .58 7041.32N 4992.73W N 33.63 W .98 7115.75N 5041.66W N 32.64 W 1.50 7190.40N 5090.39W N 32.72 W .61 7265.56N 5138.61W N 32.84 W .69 7340.35N 5186.78W 8631.36 8720.34 8809.39 8898.54 8987.38 11618.52 5812.32 5771.67 11712.87 5845.29 5804.64 11807.22 5878.53 5837.88 11901.57 5911.57 5870.92 11995.92 5945.25 5904.60 70 4 69 0 69 43 69 16 68 53 N 32.85 W .16 7414.91N 5234.92W N 33.44 W 1.28 7488.92N 5283.25W N 33.64 W .79 7562.52N 5332.04W N 33.92 W .56 7635.97N 5381.18W N 34.39 W .63 7708.90N 5430.66W 9076.00 9164.29 9252.51 9340.83 9428.92 12090.27 5978.43 5937.78 12184.62 6010.76 5970.11 12278.97 6043.43 6002.78 12373.32 6076.66 6036.01 12467.67 6109.79 6069.14 69 56 69 59 69 29 69 15 69 37 N 34.97 W 1.25 7781.53N 5480.91W N 35.28 W .32 7854.03N 5531.91W N 35.46 W .56 7926.20N 5583.14W N 35.45 W .24 7998.14N 5634.36W N 36.11 W .75 8069.80N 5686.01W 9517.22 9605.85 9694.36 9782.66 9871.00 12562.02 6142.64 6101.99 12656.37 6175.73 6135.08 12750.72 6210.02 6169.37 12845.07 6244.34 6203.69 12939.42 6278.33 6237.68 69 37 69 18 68 3 69 16 68 29 N 36.98 W .87 8140.86N 5738 N 36.92 W .34 8211.47N 5791 N 38.86 W 2.33 8280.82N 5845 N 38.16 W 1.47 8349.59N 5900 N 38.44 W .88 8418.66N 5955 .68W 9959.43 .79W 10047.78 .76W 10135.60 .47W 10223.39 .03W 10311.33 13033.77 6316.38 6275.73 13128.12 6358.44 6317.79 13222.47 6402.37 6361.72 13316.82 6448.39 6407.74 13411.17 6496.69 6456.04 63 55 63 8 61 20 60 15 58 9 N 38.74 W 4.86 8486.12N 6008 N 35.15 W 3.50 8553.61N 6059 N 35.13 W 1.91 8621.88N 6107 N 35.97 W 1.39 8688.89N 6155 N 36.15 W 2.24 8754.39N 6203 .86W 10397.54 .62W 10481.97 .67W 10565.45 .55W 10647.81 .25W 10728.84 13505.20 6547.46 6506.81 13599.87 6600.37 6559.72 13694.22 6656.18 6615.53 13788.57 6715.65 6675.00 13882.92 6778.86 6738.21 56 28 55 34 51 52 49 57 45 53 N 35.50 W 1.88 8818.55N 6249 N 35.06 W 1.02 8882.63N 6294 N 35.44 W 3.93 8944.75N 6338 N 35.22 W 2.06 9004.49N 6381 N 35.84 W 4.32 9061.47N 6421 .57W 10807.97 .91W 10886.47 .80W 10962.51 .15W 11035.74 .83W 11105.75 13977.27 6845.01 6804.36 14071.62 6911.81 6871.16 14165.97 6978.57 6937.92 14260.32 7044.98 7004.33 14327.00 7091.80 7051.15 45 4 44 46 45 8 45 24 45 23 N 35.95 W .87 9115.98N N 35.90 W .32 9169.93N N 35.98 W .38 9223.90N N 36.95 W .78 9277.80N N 36.35 W .65 9315.89N 6461.27W 11173.03 6500.37W 11239.67 6539.50W 11306.33 6579.34W 11373.35 6607.68W 11420.82 SPE f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION MILNE POINT/MPF-18 500292268100 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/16/96 DATE OF SURVEY: 061396 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-60075 KELLY BUSHING ELEV. = 40.65 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS INCLN DIRECTION DG MN DEGREES DG/10 TOTAL RECTANGULAR COORDINATES 0 NORTH/SOUTH EAST/WEST VERT. SECT. 14354.67 7111.25 7070.60 45 16 N 36.41 W .47 9331.73N 14449.02 7177.86 7137.21 44 54 N 36.61 W .41 9385.44N 14543.37 7243.99 7203.34 46 5 N 36.76 W 1.26 9439.40N 14637.72 7309.23 7268.58 46 24 N 36.72 W .34 9494.02N 14708.00 7357.62 7316.97 46 34 N 37.01 W .38 9534.80N 6619.35W 11440.50 6659.10W 11507.31 6699.31W 11574.59 6740.08W 11642.75 6770.66W 11693.71 14732.07 7374.16 7333.51 46 36 N 37.27 W .81 9548.74N 14763.97 7396.03 7355.38 46 47 N 35.79 W 3.43 9567.39N 14795.93 7417.94 7377.29 46 39 N 37.06 W 2.92 9586.11N 6781.22W 11711.19 6795.03W 11734.41 6808.85W 11757.67 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 11758.15 FEET AT NORTH 35 DEG. 23 MIN. WEST AT MD = 14795 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 324.10 DEG. TIE-IN SURVEY AT 7842.56' MD LAST SURVEY STATION AT 14795.93' MD SPt Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION MILNE POINT/MPF-18 500292268100 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/16/96 DATE OF SURVEY: 061396 JOB NUMBER: AK-EI-60075 KELLY BUSHING ELEV. = 40.65 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 7842.56 4485.39 4444.74 4514.43 N 3216.63 W 8842.56 4847.43 4806.78 5260.76 N 3774.89 W 9842.56 5202.15 5161.50 6031.87 N 4303.40 W 10842.56 5554.67 5514.02 6801.49 N 4835.69 W 11842.56 5890.78 5850.13 7590.12 N 5350.40 W 3357.17 3995.13 637.96 4640.41 645.29 5287.89 647.48 5951.79 663.89 12842.56 6243.45 6202.80 8347.75 N 5899.02 W 13842.56 6751.22 6710.57 9037.60 N 6404.67 W 14795.93 7417.94 7377.29 9586.11 N 6808.85 W 6599.11 647.32 7091.34 492.23 7377.99 286.64 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPt Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION MILNE POINT/MPF-18 500292268100 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/16/96 DATE OF SURVEY: 061396 JOB NUMBER: AK-EI-60075 KELLY BUSHING ELEV. = 40.65 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 7842.56 4485.39 4444.74 4514.43 N 3216.63 W 3357.17 7999.23 4540.65 4500.00 4633.01 N 3302.82 W 3458.58 101.41 8273.60 4640.65 4600.00 4838.94 N 3454.05 W 3632.95 174.37 8551.15 4740.65 4700.00 5045.99 N 3609.47 W 3810.50 177.55 8824.04 4840.65 4800.00 5247.03 N 3764.47 W 3983.39 172.89 9104.44 4940.65 4900.00 5460.33 N 3916.46 W 4163.79 180.40 9393.10 5040.65 5000.00 5685.11 N 4067.43 W 4352.45 188.65 9669.49 5140.65 5100.00 5898.57 N 4211.73 W 4528.84 176.39 9948.75 5240.65 5200.00 6113.09 N 4359.95 W 4708.10 179.27 10231.33 5340.65 5300.00 6330.49 N 4510.22 W 4890.68 182.57 10519.04 5440.65 5400.00 6551.53 N 4664.88 W 5078.39 187.71 10801.95 5540.65 5500.00 6769.73 N 4814.61 W 5261.30 182.91 11098.14 5640.65 5600.00 7002.76 N 4967.65 W 5457.49 196.19 11404.73 5740.65 5700.00 7245.61 N 5125.79 W 5664.08 206.59 11699.92 5840.65 5800.00 7478.83 N 5276.58 W 5859.27 195.19 11983.14 5940.65 5900.00 7699.06 N 5423.92 W 6042.49 183.22 12271.04 6040.65 6000.00 7920.15 N 5578.83 W 6230.39 187.90 12556.29 6140.65 6100.00 8136.57 N 5735.45 W 6415.64 185.25 12834.64 6240.65 6200.00 8341.92 N 5894.45 W 6593.99 178.34 13088.50 6340.65 6300.00 8524.95 N 6038.84 W 6747.85 153.87 13301.21 6440.65 6400.00 8677.92 N 6147.59 W 6860.56 112.71 13492.86 6540.65 6500.00 8810.18 N 6243.60 W 6952.21 91.65 13668.74 6640.65 6600.00 8928.28 N 6327.11 W 7028.09 75.88 13826.75 6740.65 6700.00 9028.02 N 6397.84 W 7086.10 58.00 13971.10 6840.65 6800.00 9112.44 N 6458.71 W 7130.45 44.35 14112.26 6940.65 6900.00 9193.13 N 6517.16 W 7171.61 41.17 14254.16 7040.65 7000.00 9274.30 N 6576.70 W 7213.51 41.90 14396.44 7140.65 7100.00 9355.61 N 6636.96 W 7255.79 42.28 14538.55 7240.65 7200.00 9436.62 N 6697.23 W 7297.90 42.12 14683.32 7340.65 7300.00 9520.48 N 6759.87 W 7342.67 44.76 14795.93 7417.94 7377.29 9586.11 N 6808.85 W 7377.99 35.32 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS .... ~x,. ~.o, ?o/~/c5c WELL NO:MPF-18 MILNE POINT, NORTH SLOPE, ALASKA Gyro Multishot Survey Inside 7" Casing Survey date ' 18-JUNE, 1996 Job number :AK0696C349 RECEIVED ,~OV 2 1 1996 Alaska 0il & flas Cons. Commission Anchorage SR349.DOC Gyrodata Incorporated RO. Box 79389 Houston, Texas 77279 713/461-3146 Fax: 713/461-0920 July 15, 1996 B.P. Exploraton (Alaska) Inc. Petrotechnical Data Center, MB 3-3 900 E. Benson Blvd. Anchorage, AK 99519-6612 Re: F-Pad, Well No: MPF-18, Milne Point, North Slope AK Enclosed please find one (1) original and six (6) copies and one (1) disk of the completed survey of Well # MPF-18 We would like to take this opportunity to thank you for using Gyrodata and we look forward to serving you in the future. Sincerely Robert J. Shoup Operations Manager RS/fec Serving the Worldwide Energy Industry with Precision Survey Instrumentation gyro/data CONTENTS JOB NUMBER :AK0696C349 I. DISCUSSION, SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR349.DOC gyro/data 1. DISCUSSION , SURVEY CERTIFICATION SHEET SR349.DOC gyro/data DISCUSSION JOB NUMBER' AK0696C349 Tool 749 was run in WELL# MPF-18 on ATLAS 15/32" Wireline inside drillpipe, survey was run without problems. SR349.DOC gyro/data SURVEY CERTIFICATION SHEET JOB NUMBER: AK0696C349 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the wellsite. Checked by :- ROB SHOUP OPERATIONS MANAGER SR349.DOC gyro/data 2. SURVEY DETAILS SR349.DOC gyro/data SURVEY DETAILS JOB NUMBER: AK0696C349 CLIENT: B.P. EXPLORATION RIG: ATLAS LOCATION: MILNE POINT FIELD, ALASKA WELL: MPF-18 LATITUDE: 70.505 N LONGITUDE: 149.5 W SURVEY DATE: 18 JUNE, 1996 SURVEY TYPE : MULTISHOT IN 7 IN. CASING DEPTH REFERENCE: MAX. SURVEY DEPTH: ROTARY TABLE ELEVATION 40.65FT. 14800 FT. SURVEY TIED ONTO: NA SURVEY INTERVAL: 50' FROM 0-14800' UTM CO-ORDINATES: TARGET DIRECTION: 324.53 GRID CORRECTION: CALCULATION METHOD: N/A MINIMUM CURVATURE SURVEYOR: TOM STODDARD SR349.DOC gyro/data 3. OUTRUN SURVEY LISTING SR349.DOC A Gyro da t a D i r e c t i ona I Survey for B.P. EXPLORATION WELL: MPF-18, 7" Location: F PAD, MILNE POINT FIELD, ALASKA lob Number: AK0696C349 Jun Date: 18-Jun-96 15:45:00 ~urveyor: TOM STODDARD ~alculation Method: MINIMUM CURVATURE ~urvey Latitude: 70.505000 deg. N ~ub-sea Correction from Vertical Reference: 40.65 ft. ~zimuth Correction: ~yro: Bearings are Relative to True North ?roposed Well Direction: 324.530 deg ;ertical Section Calculated from Well Head Location ~losure Calculated from Well Head Location {orizontal Coordinates Calculated from Local Horizontal Reference A Gyroda t a D i re c t i ona i Survey .P. EXPLORATION tELL: MPF-18, 7" ,ocation: F PAD, MILNE POINT FIELD, 'ob Number: AK0696C349 ALASKA [EASURED I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH. feet deg./ feet deg. 100 ft. 0.0 0.00 0.00 0.0 0.0 -40.7 0.00 0.0 0.0 0-14810ft.) A GYRO MULTISHOT SURVEY RUN IN 7" CASING ~LL MEASURED DEPTHS REFERENCED TO ORIGINAL R,K.B.ELEV.OF 40.65' Page HORIZONTAL COORDINATES feet 0.00 N 0.00E 110.0 .32 114.35 110.0 -.3 69.3 .29 .3 114.3 210.0 .33 148.15 210.0 -.8 169.3 .19 .8 125.4 310.0 .37 117.58 310.0 -1.4 269.3 .19 1.4 128.1 410,0 .18 130.89 410.0 -1.8 369.3 .21 1.9 126.6 510.0 .04 192.88 510.0 -2.0 469.3 .16 2.1 127.8 610.0 1.49 314.03 610.0 -.7 569.3 1.51 .8 120,1 660.0 2.54 313.67 660.0 1.0 619.3 2.10 1.0 325.1 710.0 3.33 317.69 709.9 3.5 669.2 1.63 3.5 318.5 760.0 3.89 317.12 759.8 6.6 719.1 1.13 6.7 318.0 810.0 4.42 318.78 809.7 10.2 769.0 1.09 10.3 318.0 860.0 4.86 320.84 859.5 14.3 818.8 .94 14.3 318.5 910.0 6.48 319.76 909.2 19.2 868.6 3.25 19.3 318.9 960.0 8.27 318.71 958.8 25.6 918.2 3.58 25.7 319.0 1010.0 9.56 317.59 1008.2 33.3 967.6 2.60 33.5 318.8 1060.0 10.66 315.47 1057.4 42.0 1016.8 2.31 42.2 318.3 1110.0 12.08 315.22 1106.5 51.7 1065.8 2.86 52.1 317.7 1160.0 12.96 314.91 1155.3 62.4 1114.6 1.76 62.9 317.3 1210.0 13.62 315.87 1203.9 73.7 1163.3 1.39 74.4 317.0 1260.0 14.56 315.99 1252.4 85.8 1211.8 1.88 86.6 316.8 1310.0 16.49 316.66 1300.6 99.0 1260.0 3.88 99.9 316.8 · 13 S .28 E .49 S .69 E .89 S 1.13 E 1.14 S 1.54 E 1.28 S 1.64 E .41 S .70 E .81 N .56 W 2.64 N 2.34 W 4.96 N 4.47 W 7.65 N 6.89 W 10.74 N 9.50 W 14.54 N 12.67 W 19.40 N 16.86 W 25.17 N 22.04 W 31.53 N 28.08 W 38.54 N 35.01 W 46.21 N 42.67 W 54.40 N 50.74 W 63.15 N 59.21 W 72.83 N 68.45 W A Gyroda t a D i re c t i ona i Survey I.P. EXPLORATION IELL: MPF-18, 7" Jocation: F PAD, MILNE POINT FIELD, 'ob Number: AK0696C349 ALASKA Page IEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY.DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL C O O R D I NAT E.S feet 1360.0 1410.0 1460.0 1510.0 1560.0 17.89 318.03 1348.4 19.84 317.33 1395.7 20.21 318.60 1442.7 20.57 319.81 1489.5 21.75 318.52 1536.2 113 129 146 164 182 .7 .7 .8 .1 .1 1307.7 1355.0 1402.0 1448.9 1495.5 2.91 114.7 316.9 3.93 130.9 317.0 1.14 148.0 317.1 1.10 165.4 317.3 2.54 183.4 317.5 83.70 N 78.45 W 95.65 N 89.34 W 108.37 N 100.80 W 121.56 N 112.18 W 135.21 N 123.99 W 1610.0 1660.0 1710.0 1760.0 1810.0 23.47 320.32 1582.3 24.95 321.27 1627.9 26.40 321.32 1673.0 27.70 323.14 1717.5 28.60 324.13 1761.6 201 221 243 266 289 .2 .7 .3 .0 .6 1541.7 1587.3 1632.3 1676.9 1720.9 3.70 202.7 317.7 3.06 223.1 318.0 2.91 244.8 318.3 3.07 267.4 318.6 2.03 290.9 319.0 149.81 N 136.48 W 165.70 N 149.43 W 182.60 N 162.98 W 200.58 N 176.89 W 219.57 N :190.88 W 1860.0 1910.0 1960.0 2010.0 2060.0 29.06 324.50 1805.4 29.43 323.92 1849.0 30.88 323.55 1892.3 31.89 323.48 1934.9 33.90 325.84 1976.9 313 338 363 389 416 .7 .1 .2 .3 .4 1764.7 1808.4 1851.6 1894.3 1936.3 1.00 315.0 319.4 .92 339.3 319.8 2.92 364.4 320.0 2.04 390.4 320.3 4.75 417.4 320.5 239.16 N 204.94 W 258.97 N 219.22 W 279.22 N 234.08 W 300.16 N 249.56 W 322.31 N 265.25 W 2110.0 2160.0 2210.0 2260.0 2310.0 35.42 325.52 2018.1 36.96 323.93 2058.4 37.74 324.52 2098.2 39.01 325.48 2137.3 39.78 326.05 2176.0 444 474 504 535 567 .8 .4 .7 .7 .5 1977.4 2017.8 2057.5 2096.7 2135.3 3.06 445.8 320.9 3.62 475.2 321.1 1.71 505.5 321.3 2.81 536.5 321.5 1.71 568.1 321.8 345.80 N 281.28 W 369.89 N 298.33 W 394.50 N 316.07 W 419.93 N 333.87 W 446.17 N 351.72 W 2360.0 2410.0 2460.0 2510.0 2560.0 40.73 326.24 2214.1 41.54 326.81 2251.8 42.62 327.22 2288.9 43.71 326.48 2325.4 44.69 326.80 2361.2 599.8 632.6 666.1 700.3 735.1 2173.5 2211.2 2248.3 2284.7 2320.6 1.90 600.3 322.0 1.78 633.1 322.2 2.23 666.5 322.5 2.41 700.6 322.7 2.01 735.4 322.9 473.00 N 369.71 W 500.43 N 387.85 W 528.54 N 406.09 W 557.17 N 424.80 W 586.29 N 443.97 W A Gyrodat a D i r e c t i ona i Survey ~.P. EXPLORATION [ELL: MPF-18, 7" Jocation: F PAD, MILNE POINT FIELD, ~ob Number: AK0696C349 ALASKA Page IEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 2610.0 45.73 327.97 2396.5 2660.0 46.35 326.76 2431.2 2710.0 46.91 326.50 2465.5 27'60.0 47.14 327.64 2499.6 2810.0 48.63 327.67 2533.1 770 806 842 879 916 .5, .5 .8 .4 .4 2355.8 2390.5 2424.9 2458.9 2492.5 2.66 770.8 323.1 2.14 806.7 323.3 1.19 843.0 323.4 1.73 879.5 323.6 2.98 916.5 323.7 616.18 N 646.48 N 676.84 N 707.54 N 738.88 N 463.09 W 482.50 W 502.49 W 522.38 W 542.22 W 2860.0 49.73 326.24 2565.8 2910.0 51.47 322.59 2597.5 2960.0 52.73 323.55 2628.3 3000.0 54.06 325.45 2652.1 3100.0 55.80 324.63 2709.6 954 992 1032 1064 1146 .2 .8 .3 .4 .2 2525.1 2556.9 2587.6 2611.5 2668.9 3.08 954.3 323.9 6.62 992.9 323.9 2.95 1032.3 323.8 5.04 1064.4 323.9 1.87 1146.3 323.9 770.59 N 801.99 N 833.53 N 859.67 N 926.74 N 562.86 W 585.35 W 609.05 W 627.70 W 674.60 W 3150.0 56.49 324.14 2737.4 3200.0 58.06 323.71 2764.4 3250.0 59.18 323.48 2790.5 3300.0 60.52 323.21 2815.6 3350.0 61.68 323.13 2839.8 1187 1229 1272 1315 1359 .7 .8 .5 .7 .5 2696.8 2723.8 2749.8 2774.9 2799.1 1.59 1187.8 324.0 3.24 1229.9 324.0 2.27 1272.5 323.9 2.72 1315.8 323.9 2.33 1359.5 323.9 960.50 N 994.49 N 1028.85 N 1063.53 N 1098.56 N 698.78 W 7'23.55 W 748.88 W 774.70 W 800.94 W 3400.0 62.91 322.94 2863.0 3450.0 63.81 322.64 2885.4 3500.0 65.07 322.27 2907.0 3550.0 65.76 322.02 2927.8 3600.0 66.02 321.82 2948.2 1403 1448 1493 1538 1584 .7 .4 .5 .9 .5 2822.3 2844.8 2866.3 2887.1 2907.6 2.48 1403.8 323.9 1.88 1448.5 323.8 2.61 1493.6 323.8 1.45 1539.0 323.8 .63 1584.6 323.7 1133.93 N 1169.53 N 1205.29 N 1241.19 N 1277.11 N 827.56 W 854.59 W 882.08 W 909.98 W 938.13 W 3650.0 65.84 321.71 2968.6 3700.Q 65.95 321.71 2989.0 3750.0 67.25 321.53 3008.9 3800.0 68.29 321.30 3027.8 3850.0 68.17 321.27 3046.3 1630 1675 1721 1767 1814 .1 .7 .5 .7 .1 2928.0 2948.4 2968.2 2987.1 3005.7 .40 1630.3 323.6 .23 1675.9 323.6 2.62 1721.7 323.5 2.11 1768.0 323.5 .25 1814.4 323.4 1312.97 N 1348.79 N 1384.77 N 1420.94 N 1457.17 N 966.38 W 994.66 W 1023.15 W 1052.02 W 1081.06 W A Gyroda t a D i r e c t i ona i Survey ~.P. EXPLORATION tELL: MPF-18, 7" ,ocation: F PAD, MILNE POINT FIELD, 'ob Number: AK0696C349 ALASKA Page [EASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH. feet deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 3900.0 67.85 321.14 3065.1 3950.0 67.64 321.30 3084.0 4000.0 67.52 321.43 3103.1 4050.0 68.33 321.61 3121.9 4100.0 68.19 321.61 3140.4 1860.3 1906.5 1952.7 1999.0 2045.3 3024.4 3043.4 3062.4 3081.2 3099.7 .67 1860.7 323.4 .51 1907.0 323.3 .35 1953.2 323.3 1.66 1999.5 323.2 .28 2045.9 323.2 1493.31 N 1529.38 N 1565.48 N 1601.75 N 1638.16 N 1110.11 W 1139.09 W 1167.95 W 1196.78 W 1225.62 W 4150.0 68.22 321.75 3159.0 4200.0 68.52 321.89 3177.4 4250.0 69.24 321.97 3195.4 4300.0 69.01 322.01 3213.2 4350.0 68.85 322.02 3231.2 4400.0 68.98 322.17 3249.2 4450.0 68.91 322.28 3267.1 4500.0 69.06 322.85 3285.1 4550.0 69.42 323.30 3302.8 4600.0 69.26 323.06 3320.4 2091.7 2138.1 2184.7 2231.4 2278.0 2324.6 2371.3 2417.9 2464.6 2511.4 3118.3 3136.7 3154.8 3172.6 3190.5 3208.5 3226.5 3244.4 3262.1 3279.8 .28 2092.3 323.2 · 65 2138.8 323.1 1.44 2185.4 323.1 .46 2232.1 323.1 .32 2278.8 323.1 .38 2325.4 323.0 .25 2372.1 323.0 1.11 2418.7 323.0 1.10 2465.5 323.0 .54 2512.3 323.0 1674.58 N 1711.12 N 1747.83 N 1784.64 N 1821.42 N 1858.23 N 1895.11 N 1932.17 N 1969.55 N 2007.00 N 1254.41 W 1283.14 W 1311.90 W 1340.67 W 1369.38 W 1398.04 W 1426.62 W 1454.99 W 1483.08 W 1511.12 W 4650.0 69.10 322.86 3338.2 4700.0 68.96 322.74 3356.1 4750.0 68.85 322.88 3374.1 4800.0 68.95 324.00 3392.1 4850.0 68.70 324.32 3410.2 2558.1 2604.8 2651.4 2698.1 2744.7 3297.6 3315.5 3333.4 3351.4 3369.5 .50 2559.0 323.0 .35 2605.7 323.0 .33 2652.4 323.0 2.10 2699.0 323.0 .79 2745.6 323.0 2044.31 N 2081.50 N 2118.66 N 2156.13 N 2193.92 N 1539.27 W 1567.50 W 1595.69 W 1623.48 W 1650.78 W 4900.0 68.22 324.00 3428.5 4950.0 68.08 323.85 3447.1 5000.0 67.86 323.81 3465.9 5050.0 67.62 323.81 3484.8 5100.0 67.51 323.76 3503.9 2791.2 2837.6 2883.9 2930.2 2976.4 3387.9 3406.5 3425.2 3444.2 3463.3 1.13 2792.1 323.1 .39 2838.5 323.1 .44 2884.9 323.1 .49 2931.1 323.1 .23 2977.3 323.1 2231.63 N 2269.13 N 2306.55 N 2343.90 N 2381.19 N 1678.01 W 1705.34 W 1732.69 W 1760.01 W 1787.32 W A Gyro da t a D i r e c t i ona i Survey ~.P. EXPLORATION }ELL: MPF-18, 7" ~ocation: F PAD, MILNE rob Number: AK0696C349 POINT FIELD, ALASKA Page [EASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 5150.0 67.32 324.33 3523.1 5200.0 67.77 325.09 3542.2 5250.0 67.41 325.08 3561.3 5300.0 67.05 325.01 3580.6 5350.0 67.78 324.98 3599.8 3022.6 3068.8 3115.0 3161.1 3207.3 3482.5 1.12 3023.5 323.1 3501.6 1.66 3069.7 323.1 3520.6 .72 3115.9 323.2 3540.0 .73 3162.0 323.2 3559.2 1.47 3208.1 323.2 2418.56 N 1814.43 W 2456.27 N 1841.12 W 2494.18 N 1867.58 W 2531.96 N 1893.99 W 2569.78 N 1920.47 W 5400.0 67.97 325.12 3618.7 5450.0 67195 325.06 3637.4 5500.0 67.77 325.08 3656.3 5550.0 67.65 325.01 3675.2 5600.0 67.80' 325.07 3694.2 3253.6 3299.9 3346.3 3392.5 3438.8 3578.0 .46 3254.4 323.3 3596.8 .13 3300.7 323.3 3615.6 .37 3347.0 323.3 3634.6 .27 3393.3 323.3 3653.5 .31 3439.5 323.4 2607.74 N 1947.00 W 2645.75 N 1973.53 W 2683.72 N 2000.05 W 2721.64 N 2026.55 W 2759.56 N 2053.06 W 5650.0 68.95 325.03 3712.6 5700.0 68.85 325.00 3730.6 5750.0 68.31 324.96 3748.9 5800.0 67.94 324.89 3767.5 5850.0 67.17 324.94 3786.6 3485.3 3531.9 3578.5 3624.9 3671.1 3672.0 2.31 3486.0 323.4 3689.9 .20 3532.6 323.4 3708.2 1.10 3579.1 323.4 3726.8 .75 3625.5 323.4 3745.9 1.53 3671.7 323.5 2797.66 N 2835.88 N 2874.00 N 2911.97 N 2949.78 N 2079.69 W 2106.43 W 2133.15 W 2159.81 W 2186.37 W 5900.0 66.44 325.81 3806.3 5950.0 67.09 326.35 3826.0 6000.0 68.02 326.41 3845.1 6050.0 68.89 326.52 3863.4 6100.0 68.13 326.55 3881.8 3717.0 3762.9 3809.1 3855.6 3902.1 3765.6 2.17 3717.6 323.5 3785.3 1.64 3763.5 323.5 3804.4 1.86 3809.7 323.5 3822.8 1.74 3856.1 323.6 3841.1 1.51 3902.6 323.6 2987.60 N 3025.73 N 3064.21 N 3102.97 N 3141.79 N 2212.48 W 2238.12 W 2263.71 W 2289.40 W 2315.05 W 6150.0 67.33 326.61 3900.7 6200.0 67.29 326.84 3920.0 6250.0 67.46 326.76 3939.2 6300.0 68.43 326.56 3958.0 6350.0 69.18 326.08 3976.1 3948.3 3994.4 4040.6 4086.9 4133.5 3860.1 1.59 3948.8 323.6 3879.4 .43 3994.9 323.7 3898.6 .37 4041.0 323.7 3917.4 1.99 4087.2 323.8 3935.4 1.75 4133.8 323.8 3180.41 N 3218.97 N 3257.59 N 3296.30 N 3335.10 N 2340.54 W 2365.85 W 2391.12 W 2416.59 W 2442.44 W A Gyroda t a D i re c t i ona I Survey i.P. EXPLORATION [ELL: MPF-18, 7" ~ocation: F PAD, MILNE POINT FIELD, 'ob Number: AK0696C349 ALASKA Page IEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH. deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 6400 6450 6500 6550 6600 .0 .0 .0 .0 .0 70.17 325.80 3993.5 70.63 325.72 4010.2 70.35 325.65 4026.9 70.04 325.56 4043.9 70.12 325.63 4060.9 4180 4227 4274 4321 4368 .3 .4 .5 .6 .6 3952.8 3969.6 3986.3 4003.2 4020.2 2.03 4180.7 323.8 · 94 4227.7 323.8 · 59 4274.8 323.8 · 63 4321.9 323.9 .21 4368.9 323.9 3373.94 N 3412.88 N 3451.81 N 3490.63 N 3529.41 N 2468.70 W 2495.21 W 2521.77 W 2548.35 W 2574.90 W 6650 6700 6750 6800 6850 .0 .0 .0 .0 .0 69.91 325.83 4078.0 69.87 325.89 4095.2 69.75 325.40 4112.4 70.20 324.03 4129.6 70.05 323.74 4146.5 4415 4462 4509 4556 4603 .6 .5 .4 .4 .4 4037.3 4054.5 4071.8 4088.9 4105.9 .56 4415.8 323.9 .13 4462.7 323.9 .96 4509.7 323.9 2.73 4556.6 324.0 .62 4603.6 324.0 3568.25 N 3607.11 N 3645.85 N 3684.20 N 3722.18 N 2601.36 W 2627.71 W 2654.19 W 2681.33 W 2709.04 W 6900 6950 7000 7050 7100 .0 .0 .0 .0 .0 69.79 323.68 4163.7 69.74 323.55 4181.0 69.49 323.53 4198.4 69.41 323.62 4216.0 69.19 323.59 4233.7 4650 4697 4744 4790 4837 .4 .3 .1 .9 .7 4123.1 4140.4 4157.8 4175.3 4193.0 .54 4650.6 324.0 .27 4697.5 323.9 .49 4744.4 323.9 .24 4791.2 323.9 .44 4838.0 323.9 3760.04 N 3797.80 N 3835.50 N 3873.17 N 3910.82 N 2736.83 W 2764.66 W 2792.52 W 2820.32 W 2848.07 W 7150 7200 7250 7300 7350 .0 .0 .0 .0 .0 68.80 323.69 4251.6 68.26 323.56 4269.9 68.04 323.51 4288.5 67.87 323.55 4307.3 69.14 323.78 4325.6 4884 4930 4977 5023 5070 .4 .9 .3 .6 .2 4210.9 4229.2 4247.8 4266.6 4284.9 · 81 4884.7 323.9 1.10 4931.2 323.9 .44 4977.6 323.9 .36 5023.9 323.9 2.58 5070.5 323.9 3948.41 N 3985.87 N 4023.19 N 4060.46 N 4097.94 N 2875.74 W 2903.34 W 2930.92 W 2958.47 W 2986.03 W 7400.0 7450.0 750O.0 7550.0 7600.0 69.15 323.97 4343.4 69.05 323.97 4361.2 68.63 324.06 4379.3 68.17 324.09 4397.7 67.89 324.01 4416.4 5116.9 5163.6 5210.2 5256.7 5303.1 4302.7 4320.6 4338.6 4357.0 4375.7 .35 5117.2 323.9 .19 5163.9 323.9 .87 5210.5 323.9 · 93 5257.0 323.9 · 56 5303.4 323.9 4135.68 N 4173.46 N 4211.19 N 4248.83 N 4286.37 N 3013.58 W 3041.05 W 3068.45 W 3095.73 W 3122.95 W A Gyrodata ALASKA ~.P. EXPLORATION ~ELL: MPF-18, 7" ~ocation: F PAD, MILNE POINT FIELD, [ob Number: AK0696C349 Direct i o n a 1 Survey Page ~EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL C O O R D I N A T E S feet 76 77 77 78 78 50.0 00.0 50.0 00.0 50.0 67.72 323.92 4435.3 5349.4 4394.6 67.99 324.07 4454.1 5395.7 4413.4 69.21 324.18 4472.3 5442.2 4431.7 69.27 324.16 4490.1 5489.0 4449.4 70.08 324.21 4507.4 5535.9 4466.8 .38 5349.7 323.9 .61 5396.0 323.9 2.45 5442.5 323.9 .13 5489.3 323.9 1.62 5536.2 323.9 4323.80 N 4361.27 N 4398.99 N 4436.90 N 4474.92 N 3150.19 W 3177.42 W 3204.70 W 3232.07 W 3259.50 W 79 79 8O 8O 81 00.0 50.0 00.0 50.0 00.0 69.91 324.20 4524.5 5582.9 4483.9 69.28 324.43 4542.0 5629.7 4501.3 69.26 324.43 4559.7 5676.5 4519.0 68.71 324.24 4577.6 5723.2 4536.9 68.42 323.99 4595.9 5769.7 4555.2 · 34 5583.2 323.9 1.34 ,5630.0 323.9 · 03 5676.8 323.9 1.16 5723.5 323.9 .74 5770.0 323.9 4513.03 N 4551.09 N 4589.12 N 4627.04 N 4664.75 N 3286.99 W 3314.32 W 3341.53 W 3368.74 W 3396.02 W 81 82 82 83 83 50.0 00.0 50.0 00.0 50.0 68.44 323.84 4614.2 5816.2 4573.6 68.08 323.43 4632.8 5862.6 4592.1 68.86 323.10 4651.1 5909.1 4610.5 68.99 322.78 4669.1 5955.8 4628.4 68.61 322.48 4687.2 6002.4 4646.5 · 30 5816.5 323.9 1.05 5862.9 323.9 1.66 5909.4 323.9 · 65 5956.1 323.9 .95 6002.7 323.9 4702.33 N 4739.73 N 4777.00 N 4814.23 N 4851.28 N 3423.41 W 3450.95 W 3478.77 W 3506.88 W 3535.17 W 84 84 85 85 86 00.0 50.0 00.0 50.0 00.0 68.25 322.42 4705.6 6048.8 4664.9 68.47 323.64 4724.0 6095.3 4683.3 68.45 323.84 4742.4 6141.8 4701.7 69.17 324.59 4760.4 6188.4 4719.8 68.98 324.43 4778.3 6235.1 4737.6 · 73 6049.2 323.9 2.31 6095.7 323.9 · 39 6142.2 323.9 1.99 6188.8 323.9 .48 6235.5 323.9 4888.15 N 4925.28 N 4962.78 N 5000.60 N 5038.62 N 3563.51 W 3591.46 W 3618.97 W 3646.23 W 3673.34 W 86 87 87 88 88 50.0 00.0 50.0 00.0 50.0 68.54 324.12 4796.4 6281.7 4755.8 68.06 323.92 4814.9 6328.2 4774.2 67.52 323.69 4833.8 6374.4 4793.1 68.14 324.01 4852.7 6420.7 4812.0 68.71 324.26 4871.0 6467.2 4830.4 1.05 6282.1 323.9 1.02 6328.5 323.9 1.17 6374.8 323.9 1.38 6421.1 323.9 1.23 6467.6 323.9 5076.45 N 5114.05 N 5151.41 N 5188.79 N 5226.48 N 3700.55 W 3727.85 W 3755.18 W 3782.50 W 3809.74 W A G y r o d a t a ~.P. EXPLORATION JELL: MPF-18, 7" ~ocation: F PAD, MILNE POINT FIELD, ALASKA [ob Number: AK0696C349 Directional Survey Page ~EASURED I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL C O O.R D I N A T E S feet 8900.0 68.55 324.24 4889.3 6513.8 8950.0 68.89 324.65 4907.4 6560.4 9000.0 68.63 324.65 4925.5 6607.0 9050.0 68.42 324.60 4943.8 6653.5 9100.0 69.16 325.36 4961.9 6700.1 4848.6 .33 6514.2 323.9 4866.8 1.02 6560.8 323.9 4884.9 .51 6607.4 323.9 4903.2 .43 6653.9 323.9 4921.3 2.05 6700.5 323.9 5264.26 N 5302.17 N 5340.18 N 5378.12 N 5416.29 N 3836.94 W 3864.03 W 3891.00 W 3917.93 W 3944.68 W 9150.0 69.15 325.85 4979.7 6746.9 9200.0 69.93 326.66 4997.2 6793.7 9250.0 69.83 326.84 5014.4 6840.6 9300.0 69.45 326.78 5031.8 6887.4 9350.0 69.15 326.60 5049.5 6934.2 4939.1 .92 6747.2 323.9 4956.5 2.17 6794.0 324.0 4973.7 .38 6840.9 324.0 4991.1 .76 6887.7 324.0 5008.8 .69 6934.4 324.0 5454.85 N 5493.81 N 5533.07 N 5572.30 N 5611.38 N 3971.08 W 3997.09 W 4022.84 W 4048.50 W 4074.19 W 9400.0 68.74 326.49 5067.4 6980.8 9450.0 68.50 326.37 5085.7 7027.3 9500.0 68.03 326.40 5104.2 7073.8 9550.0 68.20 326.20 5122.8 7120.1 9600.0 69.12 326.06 5141.0 7166.7 5026.8 .84 6981.1 324.0 5045.0 .52 7027.6 324.1 5063.5 .94 7074.0 324.1 5082.1 .51 7120.4 324.1 5100.3 1.85 7166.9 324.1 5650.31 N 5689.11 N 5727.79 N 5766.39 N 5805.05 N 4099.91 W 4125.65 W 4151.37 W 4177.11 W 4203.06 W 9650.0 69.49 326.03 5158.7 7213.4 9700.0 70.01 325.93 5176.0 7260.3 9750.0 69.65 325.82 5193.2 7307.3 9800.0 69.38 325.62 5210.7 7354.1 9850.0 68.97 325.58 5228.5 7400.8 5118.0 .74 7213.6 324.1 5135.3 1.07 7260.5 324.1 5152.6 .76 7307.4 324.1 5170.1 .66 7354.3 324.1 5187.8 .82 7401.0 324.1 5843.85 N 5882.73 N 5921.59 N 5960.29 N 5998.85 N 4229.19 W 4255.43 W 4281.76 W 4308.15 W 4334.55 W 9900.0 68.41 325.51 5246.6 7447.4 9950.0 69.23 325.48 5264.7 7494.0 [0000.0 69.16 325.52 5282.5 7540.7 [0050.0 68.82 325.54 5300.4 7587.4 k0100.0 68.36 325.43 5318.7 7633.9 5206.0 1.13 7447.5 324.2 5224.1 1.63 7494.2 324.2 5241.8 .16 7540.9 324.2 5259.8 .68 7587.5 324.2 5278.0 .94 7634.1 324.2 6037.26 N 6075.68 N 6114.20 N 6152.68 N 6191.03 N 4360.91 W 4387.32 W 4413.79 W 4440.20 W 4466.58 W A G y r o d a t a ~. P. EXPLORATION qELL: MPF-18, 7" Location: F PAD, MILNB POINT FIELD, ALASKA Iob Number: AK0696C349 Direc tional Survey Page 4EASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORD I NATES feet 10150.0 68.15 325.57 5337.2 10200.0 68.31 325.45 5355.7 10250.0 69.38 325.76 5373.8 10300.0 69.37 325.75 5391.4 10350.0 68.92 325.47 5409.2 7680.4 7726.8 7773.4 7820.2 7866.9 5296.5 5315.1 5333.1 5350.7 5368.5 .49 7680.5 324.2 .39 7726.9 324.2 2.22 7773.6 324.2 .04 7820.3 324.2 1.03 7867.0 324.2 6229.31 N 6267.58 N 6306.05 N 6344.74 N 6383.29 N 4492.89 W 4519.18 W 4545.52 W 4571.86 W 4598.25 W L0400.0 69.28 325.27 5427.0 L0450.0 69.88 325.36 5444.5 L0500.0 69.50 325.25 5461.8 L0550.0 69.17 325.15 5479.5 L0600.0 68.79 325.20 5497.4 7913.6 7960.5 8007.4 8054.2 8100.8 5386.4 5403 . 8 5421.2 5438 . 8 5456.8 .80 7913.7 324.2 1~22 7960.6 324.2 .79 8007.5 324.3 .67 8054.2 324.3 .77 8100.9 324.3 6421.73 N 6460.26 N 6498.81 N 6537.23 N 6575.54 N 4624.79 W 4651.46 W 4678.15 W 4704.84 W 4731.50 W 10650.0 68.47 325.37 5515.6 10700.0 69.37 326.09 5533.6 10750.0 69.77 326.40 5551.1 10800.0 69.50 326.32 5568.5 10850.0 69.22 326.40 5586.1 8147.4 8194.0 8240.9 8287.7 8334.5 5475.0 5493.0 5510.4 5527.8 5545.4 .72 8147.5 324.3 2.25 8194.1 324.3 · 99 8240.9 324.3 .57 8287.8 324.3 · 58 8334.5 324.3 6613.82 N 6652.37 N 6691.33 N 6730.35 N 6769.31 N 4758.01 W 4784.28 W 4810.31 W 4836.28 W 4862.20 W 10900.0 70.22 326.88 5603.4 10950.0 70.42 327.05 5620.3 11000.0 70.17 327.10 5637.1 11050.0 69.93 327.00 5654.2 11100.0 71.15 327.02 5670.8 8381.3 8428.4 8475.4 8522.4 8569.5 5562.8 5579.6 5596.5 5613.5 5630.2 2.20 8381.4 324.3 .50 8428.4 324.3 .50 8475.4 324.4 .50 8522.4 324.4 2.44 8569.5 324.4 6808.48 N 6847.95 N 6887.46 N 6926.90 N 6966.44 N 4887.99 W 4913.66 W 4939.24 W 4964.80 W 4990.47 W 11150.0 71.04 327.04 5687.0 11200.0 70.84 326.98 5703.3 11250.0 70.35 326.79 5720.0 11300.0 70.98 327.29 5736.5 11350.0 71.38 327.61 5752.6 8616.7 8663.9 8711.1 8758.2 8805.5 5646.4 5662.7 5679.3 5695.9 5712.0 .23 8616.7 324.4 .41 8664.0 324.4 1.05 8711.1 324.4 1.57 8758.2 324.4 1.01 8805.5 324.5 7006.13 N 7045.77 N 7085.27 N 7124.85 N 7164.75 N 5016.22 W 5041.95 W 5067.72 W 5093.38 W 5118.85 W A Gy r o d a t a ~. P. EXPLORATION ~ELL: MPP-18, 7" Location: F PAD, MILNE POINT FIELD, ALASKA Iob Number: AK0696C349 Direc t iona 1, Survey Page 10 4EASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 11400.0 71.24 327.61 5768.7 11450.0 70.87 327.63 5784.9 11500.0 70.43 327.48 5801.5 11550.0 70.17 327.28 5818.3 11600.0 69.81 327.24 5835.4 8852.8 8900.0 8947.1 8994.1 9041.0 5728.0 5744.2 5760.8 5777.7 5794.8 · 29 8852.8 324.5 .74 8900.0 324.5 .92 8947.1 324.5 · 65 8994.1 324.5 · 72 9041.0 324.5 7204.74 N 7244.68 N 7284.49 N 7324.14 N 7363.66 N 5144.22 W 5169.55 W 5194.86 W 5220.23 W 5245.64 W 11650.0 69.61 327.04 5852.8 11700.0 69.29 326.97 5870.3 11750.0 68.68 326.62 5888.2 11800.0 68.77 326.46 5906.4 11850.0 69.92 326.29 5924.0 9087 9134 9181 9227 9274 .9 .7 .3 .9 .6 5812.1 5829.7 5847.6 5865.7 5883.4 .56 9087.9 324.5 .65 9134.7 324.6 1.40 9181.3 324.6 .35 9227.9 324.6 2.32 9274.6 324.6 7403.05 N 7442.32 N 7481.37 N 7520.24 N 7559.20 N 5271.09 W 5296.59 W 5322.15 W 5347.84 W 5373.75 W 11900.0 69.36 326.10 5941.4 11950.0 69.13 325.90 5959.1 12000.0 68.91 325.60 5977.0 12050.0 68.77 325.42 5995.1 12100.0 69.27 325.04 6013.0 9321 9368 9414 9461 9508 .5 .2 .9 .5 .2 5900.8 5918.5 5936.4 5954.4 5972.3 1.17 9321.5 324.6 .59 9368.2 324.6 .72 9414.9 324.6 .44 9461.5 324.6 1.23 9508.2 324.6 7598.15 N 7636.91 N 7675.50 N 7713.93 N 7752.28 N 5399.83 W 5425.98 W 5452.25 W 5478.65 W 5505.28 W 12150.0 70.12 324.92 6030.3 12200.0 69.87 324.88 6047.4 12250.0 69.62 324.70 6064.8 12300.0 69.50 324.86 6082.2 12350.0 69.48 324.68 6099.7 9555 9602 9649' 9695 9742 .1 .1 .0 .8 .7 5989.7 6006.8 6024.1 6041.6 6059.1 1.70 9555.1 324.6 .51 9602.1 324.6 .60 9649.0 324.6 .39 9695.8 324.6 .35 9742.7 324.6 7790.69 N 7829.12 N 7867.45 N 7905.73 N 7943.98 N 5532.19 W 5559.20 W 5586.25 W 5613.26 W 5640.28 W 12400.0 69.26 324.53 6117.3 12450.0 69.42 324.37 6135.0 12500.0 69.61 324.07 6152.5 12550.0 69.76 323.71 6169.8 12600.0 69.53 323.26 6187.2 9789.4 9836.2 9883.1 9930.0 9976.8 6076.7 6094.3 6111.8 6129.2 6146.6 .52 9789.5 324.6 .42 9836.2 324.6 .69 9883.1 324.6 .74 9930.0 324.6 .96 · 9976.8 324.6 7982.12 N 8020.19 N 8058.19 N 8096.07 N 8133.74 N 5667.39 W 5694.59 W 5721.'97 W 5749.61 W 5777.51 W A Gyro da t a D i r e c t i ona I Survey ~.P. EXPLORATION JELL: MPF-18, 7" ~ocation: F PAD, MILNE POINT FIELD, rob Number: AK0696C349 ALASKA Page 11 ~EASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet _2650.0 69.59 323.04 6204.7 _2700.0 69.53 322.81 6222.2 _2750.0 69.58 322.71 6239.6 :2800.0 69.19 322.51 6257.2 L2850.0 69.20 322.16 6275.0 10023.7 10070.5 10117.3 10164.1 10210.8 6164.0 6181.5 6199.0 6216.6 6234.3 .42 10023.7 324.6 · 45 10070.5 324.6 .20 10117.3 324.6 · 88 10164.1 324.6 · 66 10210.8 324.6 8171.23 N 8208.61 N 8245.91 N 8283.09 N 8320.09 N 5805.61 W 5833.85 W 5862.21 W 5890.62 W 5919.18 W L2900.0 69.28 321.93 6292.7 L2950.0 69.01 321.70 6310.5 L3000.0 67.21 322.45 6329.2 L3050.0 65.78 322.44 6349.1 L3100.0 63.94 323.19 6370.3 10257.5 10304.2 10350.5 10396.4 10441.6 6252.1 6269.9 6288.5 6308.4 6329.7 .45 10257.5 324,6 .68 10304.2 324.5 3.86 10350.5 324.5 2.86 10396.4 324.5 3.93 10441.6 324.5 8356.95 N 8393.68 N 8430.27 N 8466.62 N 8502.68 N 5947.94 W 5976.82 W 6005.34 W 6033.28 W 6060.64 W L3150.0 63.15 324.03 6392.6 L3200.0 62.32 324.59 6415.5 L3250.0 62.04 325.67 6438.8 L3300.0 61.99 326.58 6462.3 L3350.0 60.15 325.98 6486.5 10486.4 10530.8 10575.0 10619.2 10662.9 6352.0 6374.9 6398.2 6421.7 6445.8 2.18 10486.4 324.5 1.93 10530.8 324.5 2.00 10575.0 324.5 1.60 10619.2 324.5 3.84 10662.9 324.5 8538.71 N 8574.81 N 8611.09 N 8647.75 N 8684.15 N 6087.20 W 6113.13 W. 6138.41 W 6163.02 W 6187.31 W L3400.0 59.81 325.82 6511.5 L3450.0 58.33 325.96 6537.2 L3500.0 58.13 325.78 6563.5 L3550.0 56.24 325.62 6590.6 L3600.0 56.08 325.29 6618.5 10706.2 10749.0 10791.5 10833.6 10875.1 6470.9 6496.6 6522.9 6550.0 6577.8 .74 10706.2 324.5 2.96 10749.0 324.5 .51 10791.5 324.5 3.79 10833.6 324.6 .62 10875.1 324.6 8719.99 N 8755.50 N 8790.69 N 8825.40 N 8859.61 N 6211.58 W 6235.63 W 6259.48 W 6283.16 W 6306.71 W L3650.0 53.88 325.06 6647.2 L3700.0 53.02 324.65 6676.9 L3750.0 51.24 324.31 6707.6 L3800.0 50.54 324.24 6739.2 L3850.0 49.40 324.58 6771.3 10916.0 10956.2 10995.7 11034.5 11072.7 6606.5 6636.3 6667.0 6698.5 6730.7 4.43 10916.0 324.6 1.83 10956.2 324.6 3.60 10995.7 324.6 1.41 11034.5 324.6 2.34 11072.7 324.6 8893.23 N 8926.07 N 8958.20 N 8989.69 N 9020.83 N 6330.09 W 6353.21 W 6376.15 W 6398.80 W 6421.08 W A Gyro dar a D i r e c t i ona i Survey l.P. EXPLORATION JELL: MPF-18, 7" ~ocation: F PAD, MILNE POINT FIELD, rob Number: AK0696C349 ALASKA Page 12 [EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES. feet .3900.0 48.60 324.43 6804.1 _3950.0 46.97 324.22 6837.7 _4000.0 45.49 323.96 6872.3 _4050.0 44.39 323.54 6907.7 _4100.0 44.77 323.64 6943.3 11110.5 6763.5 1.62 11110.5 324.6 11147.5 6797.1 3.28 11147.5 324.6 11183.6 6831.7 2.97 11183.6 324.6 11218.9 6867.1 2.28 11218.9 324.6 11254.0 6902.7 .78 11254.0 324.5 9051.55 N 9081.63 N 9110.87 N 9139.36 N 9167.60 N 6442.99 W 6464.58 W 6485.76 W 6506.64 W 6527.48 W _4150.0 45.03 323.56 6978.7 .4200.0 45.30 323.52 7014.0 _4250.0 45.53 323.41 7049.1 _4300.0 45.60 323.28 7084.1 _4350.0 45.26 323.03 7119.2 11289.3 6938.1 .53 11289.3 324.5 11324.8 6973.3 .55 11324.8 324.5 11360.4 7008.4 .48 11360.4 324.5 11396.1 7043.4 .25 11396.1 324.5 11431.7 7078.5 .78 11431.7 324.5 9196.01 N 9224.52 N 9253.14 N 9281.78 N 9310.29 N 6548.42 W 6569.49 W 6590.69 W 6612.01 W 6633.37 W _4400.0 45.10 323.00 7154.4 _4450.0 44.88 322.98 7189.8 ~4500.0 45.18 322.90 7225.1 [4550.0 45.82 322.81 7260.2 [4600.0 46.24 322.58 7294.9 11467.1 7113.8 .32 11467.1 324.5 11502.5 7149.1 .43 11502.5 324.5 11537.8 7184.5 .61 11537.8 324.5 11573.5 7219.5 1.28 11573.5 324.5 11609.4 7254.2 .91 11609.4 324.5 9338.61 N 9366.84 N 9395.07 N 9423.50 N 9452.13 N 6654.70 W 6675.98 W 6697.30 W 6718.83 W 6740.64 W L4650.0 46.38 322.49 7329.4 L4700.0 46.50 322.37 7363.9 [4750.0 46.63 321.94 7398.3 [4800.0 46.43 321.78 7432.7 11645.6 7288.8 .31 11645.6 324.5 11681.8 7323.2 .29 11681.8 324.5 11718.0 7357.6 .68 11718.0 324.5 11754.3 7392.0 .46 11754.3 324.5 9480.82 N 9509.54 N 9538.21 N 9566.75 N 6762.63 W 6784.72 W 6806.99 W 6829.40 W ~inal Station Closure: Distance: 11754.29 ft Az: 324.48 deg. A Gyroda t a D i r e c t i ona i Survey for B.P. EXPLORATION WELL: MPF-18, 7" Location: F PAD, MILNE POINT FIELD, ALASKA 'ob Number: AK0696C349SS .un Date: 18-Jun-96 15:45:00 lurveyor: TOM STODDARD lalculation Method: MINIMUM CURVATURE lurvey Latitude: 70.505000 deg. N lub-sea Correction from Vertical Reference: 40.65 ft. ~zimuth Correction: :yro: Bearings are Relative to True North ~roposed Well Direction: 324.530 deg ~ertical Section Calculated from Well Head Location ~losure Calculated from Well Head Location {orizontal Coordinates Calculated from Local Horizontal Reference A Gyrodata ~.P. EXPLORATION ~ELL: MPF-18, 7" Jocation: F PAD, MILNE POINT FIELD, lob Number: AK0696C349SS ALASKA Directional SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE DEPTH DEPTH SECTION SEVERITY DIST. AZIMUTH feet deg. deg. feet feet deg./ feet deg. 100 ft. -40.7 0.00 0.00 0.0 0.0 0.00 0.0 0.0 Survey HORIZONTAL C O O R D I N A T,E S feet 0.00 N 0.00 E Page (0-14810ft.) A GYRO MULTISHOT SURVEY RUN IN 7" CASING ~LL MEASURED DEPTHS REFERENCED TO ORIGINAL R.K.B.ELEV.OF 40.65' 100.0 .33 124.71 140.7 -.4 .26 .8 200.0 .35 138.78 240.7 -1.0 .19 1.4 300.0 .31 121.66 340.7 -1.5 .19 1.9 400.0 .13 149.89 440.7 -1.9 .19 2.1 500.0 .48 230.02 540.7 -1.6 .57 .8 600.0 2.13 313.81 640.7 .3 1.87 1.0 700.0 3.67 317.34 740.7 5.4 1.32 6.7 800.0 4.70 320.06 840.7 12.7 1.00 14.3 900.0 7.62 319.10 940.7 23.2 3.46 25.7 1000.0 10.28 316.19 1040.7 39.0 2.41 42.2 1100 · 0 12 . 70 315 . 00 1140 . 7 59 · 2 2 . 09 62 . 9 1200 · 0 14 . 33 315 . 96 1240 . 7 82 . 9 1 . 76 86 . 6 1300 · 0 17 . 66 317 · 81 1340 · 7 111 . 3 3 . 06 114 · 7 1400 . 0 20 . 20 318 . 54 1440 . 7 146 . 0 1 . 26 148 . 0 1500 . 0 21 . 91 318 . 70 1540 . 7 183 . 9 2 . 65 202 . 7 1600.0 25.36 321.29 1640.7 227.8 3.02 244.8 1700.0 28.17 323.66 1740.7 278.4 2.53 290.9 1800.0 29.36 324.03 1840.7 333.4 .94 339.3 1900.0 32.17 323.80 1940.7 393.0 2.41 417.4 2000.0 36.28 324.63 2040.7 461.4 3.37 475.2 117.7 .24 S .41 E 126.2 .61 S .83 E 127.7 .97 S 1.26 E 126.9 1.18 S 1.57 E 125.4 1.01 S 1.36 E 245.9 .65 N .62 W 318.2 4.07 N 3.65 W 318.3 9.57 N 8.52 W 319.0 17.62 N 15.32 W 318.5 29.36 N 26.02 W 317.4 43.92 N 40.37 W 316.9 61.02 N 57.15 W 316.8 81.95 N 76.84 W 317.1 107.83 N 100.31 W 317.5 136.63 N 125.20 W 318'.0 170.47 N 153.26 W 318.8 210.55 N 184.23 W 319.7 255.17 N 216.48 W 320.3 303.17 N 251.70 W 321.0 359.29 N 290.83 W A Gyroda t a D i r e c t iona 1 Survey I.P. EXPLORATION ;ELL: MPF-18, 7" ~ocation: F PAD, MILNE POINT FIELD, [ob Number: AK0696C349SS ALASKA Page SUBSEA DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL C O.O R D I N A T E S feet 210 220 230 240 250 0.0 39.08 325.53 2140.7 0.0 41.30 326.64 2240.7 0.0 44.13 326.62 2340.7 0.0 46.50 326.69 2440.7 0.0 48.89 327.34 2540.7 538 622 715 816 925 .4 .9 .1 .5 .1 2.71 568.1 321.5 1.82 633.1 322.2 2.24 735.4 322.8 1.88 843.0 323.3 3.00 954.3 323.8 422.17 N 335.39 W 492.31 N 382.48 W 569.57 N 432.96 W 654.87 N 488.02 W 746.19 N 546.98 W 260 270 280 290 300 0.0 53.42 324.54 2640.7 0.0 56.68 324.09 2740.7 0.0 61.73 323.12 2840.7 0.0 65.92 321.89 2940.7 0.0 68.20 321.28 3040.7 1048 1192 1361 1567 1799 .9 .8 .2 .6 .8 .04 1064.4 323.9 .79 1229.9 324.0 .33 1403.8 323.9 .94 1584.6 323.7 .82 1814.4 323.4 847.11 N 964.56 N 1099.93 N 1263.81 N 1446.05 N 618.74 W 701.74 W 801.96 W 927.70 W 1072.14 W 310 320 330 340 35O 0.0 68.19 321.61 3140.7 0.0 68.92 322.10 3240.7 0.0 69.08 322.85 3340.7 0.0 68.13 323.90 3440.7 0.0 67.73 325.03 3540.7 2046 2302 2564 2821 3065 .0 .5 .5 .4 .0 .28 2092.3 323.2 .35 2325.4 323.1 .48 2605.7 323.0 .65 2838.5 323.1 1.62 3069.7 323.1 1638.67 N 1840.77 N 2049.39 N 2256.08 N 2453.21 N 1226.03 W 1384.45 W 1543.13 W 1695.82 W 1838.95 W 360 370 380 390 400 0.0 67.92 325.06 3640.7 0.0 68.55 324.98 3740.7 0.0 67.81 326.40 3840.7 0.0 67.53 326.75 3940.7 0.0 70.10 325.58 4040.7 3307 3557 3798 4044 4312 .9 .5 .4 .0 .7 .17 3347.0 323.3 .70 3579.1 323.4 1.81 3809.7 323.5 .49 4087.2 323.7 .62 4321.9 323.9 2652.26 N 2856.86 N 3055.27 N 3260.50 N 3483.26 N 1978.08 W 2121.14 W 2257.76 W 2393.03 W 2543.30 W 410 420 430 440 45O 0.0 70.11 323.84 4140.7 0.0 69.04 323.63 4240.7 0.0 69.15 323.94 4340.7 0.0 67.80 323.96 4440.7 0.0 69.32 324.41 4540.7 4587.1 4855.9 5109.7 5362.6 5626.2 1.35 4603.6 324.0 .58 4884.7 323.9 .69 5117.2 323.9 .44 5396.0 323.9 1.27 5630.0 323.9 3709.00 N 3925.49 N 4129.91 N 4334.53 N 4548.22 N 2699.42 W 2858.87 W 3009.37 W 3157.99 W 3312.27 W A Gyroda t a D i r e c t i ona i Survey I.P. EXPLORATION IELL: MPF-18, 7" ,ocation: F PAD, MILNE POINT FIELD, 'ob Number: AK0696C349SS ALASKA Page SUBSEA DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 4600.0 4700.0 4800.0 4900.0 5O00.0 68.42 323.29 4640.7 68.45 323.83 4740.7 67.75 323.81 4840.7 68.46 324.61 4940.7 69.30 326.69 5040.7 5882 6137 6391 6645 6910 .6 .5 .3 .5 .9 1.31 5909.4 323.9 · 57 6142.2 323.9 1.24 6421.1 323.9 · 45 6653.9 323.9 .73 6934.4 324.0 4755.75 N 3462.91 W 4959.30 N 3616.42 W 5165.01 N 3765.12 W 5371.54 N 3913.26 W 5591.90 N 4061.39 W 5100.0 5200.0 53OO.O 5400.0 5500.0 69.10 326.07 5140.7 68.60 325.53 5240.7 68.18 325.54 5340.7 69.75 325.34 5440.7 69.53 326.22 5540.7 7165 7432 7689 7950 8212 .8 .0 .1 .3 .9 1.83 7166.9 324.1 1.03 7447.5 324'.2 .47 7726.9 324.2 1.13 7960.6 324.2 1.74 8240.9 324.3 5804.33 N 4202.58 W 6024.58 N 4352.21 W 6236.47 N 4497.81 W 6451.84. N 4645.63 W 6668.09 N 4794.79 W 5600.0 57OO.O 5800.0 5900.0 6000.0 70.12 327.08 5640.7 8485 71.08 327.37 5740.7 8770 69.75 327.18 5840.7 9055 69.39 326.10 5940.7 9319 69.97 324.90 6040.7 9583 .1 .3 .2 .4 .4 .50 8522.4 324.4 1.43 8805.5 324.4 .67 9087.9 324.5 1.22 9321.5 324.6 .98 9602.1 324.6 6895.63 N 4944.54 W 7135.09 N 5099.91 W 7375.53 N 5253.31 W 7596.44 N 5398.69 W 7813.87 N 5548.48 W 6100.0 6200.0 6300.0 6400.0 6500.0 69.48 324.27 6140.7 9851 69.56 322.70 6240.7 10120 66.39 322.45 6340.7 10377 62.03 325.74 6440.7 10578 58.30 325.94 6540.7 10754 .4 .1 .0 .4 .6 .51 9883.1 324.6 · 24 10164.1 324.6 3.28 10396.4 324.5 1.97 10619.2 324.5 2.64 10791.5 324.5 8032.48 N 5703.45 W 8248.07 N 5863.86 W 8451.24 N 6021.45 W 8613.91 N 6140.30 W 8760.10 N 6238.74 W 6600.0 6700~0 6800.0 6900.0 7000.0 54.38 325.11 6640.7 50.49 324.25 6740.7 46.84 324.20 6840.7 44.74 323.63 6940.7 45.47 323.44 7040.7 10906.7 11036.2 11150.6 11251.4 11351.8 . 56 10916.0 324.6 46 11072.7 324.6 26 11183.6 324.6 89 11254.0 324.5 49 11360.4 324.5 8885.59 N 6324.78 W 8991.13 N 6399.83 W 9084.11 N 6466.38 W 9165.49 N 6525.92 W 9246.26 N 6585.60 W A Gyroda t a D i re c t i ona i Survey ~.P. EXPLORATION ~ELL: MPF-18, 7" Jocation: F PAD, MILNE POINT FIELD, [ob Number: AK0696C349SS ALASKA Page SUBSEA DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 7100.0 45.16 323.01 7140.7 7200.0 45.46 322.86 7240.7 7300.0 46.42 322.45 7340.7 7392.0 46.43 321.78 7432.7 11453.3 .50 11467.1 324.5 11553.6 .91 11573.5 324.5 11657.4 .30 11681.8 324.5 11754.3 .46 11754.3 324.5 9327.54 N 9407.67 N 9490.18 N 9566.75 N 6646.36 W 6706.84 W 6769.83 W 6829.40 W ~inal Station Closure: Distance: 11754.29 ft Az: 324.48 deg. gyro/data 4. QUALITY CONTROL SR349.DOC gyro/data QUALITY CONTROL REPORT JOB NUMBER: AK0696C349 TOOL NUMBER: 749 MAXIMUM GYRO TEMPERATURE: 79.59 C MAXIMUM AMBIENT TEMPERATURE: 68.6 C MAXIMUM INCLINATION: 71.56 AVERAGE AZIMUTH: 324.48 WIRELINE REZERO VALUE: REZERO ERROR / K: 10' .6756 CALIBRATION USED FOR FIELD SURVEY: 1506 CALIBRATION USED FOR FINAL SURVEY: 1506 PRE JOB MASS BALANCE OFFSET CHECK: -.6 POST JOB MASS BALANCE OFFSET CHECKt: CONDITION OF SHOCK WATCHES -1.30 USED -1.2 UPON ARRIVAL AT RIG: uPON COMPLETION OF SURVEY · OK OK UPON RETURN TO ATLAS OK BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH TVD NORTHING EASTING FIELD SURVEY 14800 46.43 321.78 7432.7 9566.75 FINAL SURVEY 14800 46.43 321.78 7432.7 9566.75 -6829.40 -- 6826.401 1 SR349.DOC ~ -. gyro/data SR349.DOC gyro/data FUNCTION TEST JOB NUMBER: AK0696C349 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 11350 71.38 71.38 71.38 71.38 71.38 AZIMUTH M.D. ft 1 2 3 4 5 11350 327.51 327.51 327.54 327.58 327.54 SR349.DOC gyro/data 5, EQUIPMENT AND CHRONOLOGICAL REPORT SR349.DOC gyro/data EQUIPMENT REPORT JOB NUMBER: AK0696C349 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 749 GYRO SECTION A0119 DATA SECTION C0002 POWER SECTION C0001 COMPUTER POWER SUPPLY PRINTER INTERFACE A0153 A0074 A0079 A0071 BACKUP TOOL No. 746 GYRO SECTION A0004 DATA SECTION C0025 POWER SECTION C0026 COMPUTER POWER SUPPLY PRINTER INTERFACE A0122 A0074 A0029 A0035 WIRELINE COMPANY: ATLAS WIRELINE CABLE SIZE: 15/32" RUNNING GEAR 3.0" SYSTEM W/4.5" CASING ROLLERS TOTAL LENGTH OF TOOL: 33.5 FEET MAXIMUM O.D.: 4.5 INCHES TOTAL WEIGHT OF TOOL: 310 POUNDS SR349.DOC gyro/data CHRONOLOGICAL REPORT JOB NUMBER: AK0696C349 07/18/96 09:00 10:30 12:30 10:15 15:45 16:00 18:50 TRANS TO LOCATION ARRIVE AT LOCATION MU TOOL TOOL WORIKffNG, STANDBY PU TOOL, MU PUMPIN SUB RIH. 3000' STRT CONT.INRUN 14800' STRT OUTRUN G.C. 07/19/96 04:30 05:00 17:30 18:50 LD TOOL BD. TOOL RD. ATLAS ARRIVE AT ATLAS RTN. TO RIG W / SURVEY. SR349.DOC HOWARD OKLAND Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 2 July 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL MPF-18 # DESCRIPTION 1 GR/CCL FINAL BL+RF 1 GR/CCL FINAL BL+RF 1 SBT/GR FINAL BL+RF ECC No. Run # 1 6712.00 Run ~ 1 6714.00 Run # 1 6719.00 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 Received by: Date: Oil & Gas Cons. Commission Anchorage HOWARD OKLAND Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHOR3kGE AK, 99501. Date: 28 June 1996 RE: Transmittal of Data Sent by: HAND CARRY WELL Dear Sir/Madam, Enclosed, please find the data as described below: # DESCRIPTION ~ PFC/PERF FINAL BL+RF ~ PFC/PERF FINAL BL+RF ~ PFC/PERF FINAL BL+RF ~PFc/pERF FINAL BL+RF ~-I"PLS FINAL BL+RF Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 6517.01 6517.02 6517.03 6714.00 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: . . _ ~ -- ~ ' I ~l*~e,k,m :' -~ ' · Anchorage ALASKA OIL AND GAS ~ONSEP~¥ATION COMMISSION '~ONY KNOWLES, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 May 30, 1996 J. D. Polya c~ Drlg ~ ' ~ o, ~.ngm~r BP Exploration (Alaska) Inc. P 0 Box 196612 Anchorage, AK 99519-6612 Re~ Milne Point Unit MPF-18 BP Exploration (Alaska) Inc. Permit No: 96-100 Sur. Loc. 1872'NSL, 2820'WEL, Sec. 6, T13N, K10E, UM Btmhole Loc. 1006'NSL, 4554'WEL, Sec. 25, 14N, RgE, UM Dear Mr. Polya: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must. be given so that a representative of the Commission my witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope David W. Jo~on I Chairman BY ORDER OF THE COMMISSION dlf/Enclosures CC; Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil la. Type of work [] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan RTE = 41.9 Milne Point Unit / Kuparuk River 3. Address 6. Property Designation Sands P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 355018 i4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 1872' NSL, 2820' WEL, SEC. 6, T13N, R10E Milne Point Unit At top of productive interval 8. Well Number Number 2S100302630-277 796' NSL, 4385' WEL, SEC. 25, T14N, R9E MPF-18 Attotal depth 9. Approximate spud date Amount $200,000.00 1006' NSL, 4554' WEL, SEC. 25, T14N, R9E 06/02/96 112. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 355021, 4274'I No Close Approach 5083 15040' MD / 7551' TVD 116. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e)(2)} Kick Off Depth 500' Maximum Hole Angle 69.1 o Maximum surface 3301 psig, At total depth (TVD) 7666' / 3060 psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 24" 20" 91.1# H-40 Weld 80' 32' 32' 112' 112' 250 sx Arcticset I (Approx.) 12-1/4" 9-5/8" 40# L-80 Btrc 7881' 31' 31' 7912' 4503' 15o6 sx PF'E', 808 sx'G', 150 sx PF'E' 8-1/2" 7" 26# L-80 Btm 12010' 30' 30' 12040' 5975' 8-1/2" 7" 26# L-80 Btm-Mod 3000' 12040' 5975' 15040' 7551' 205 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented M D TVD Structural Conductor Surface Intermediate Production Liner RECEIVED [vlAY 2 4 1996 Perforation depth: measured true vertical Alaska 0il & (~a~ (',¢~s. CofcJmissiol~ 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch /~l~fC~t~,~ Sketch [] Ddlling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: James Robertson, 564-5159 Prepared By Name/Number Kathy Campoamor, 564-5122 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed JoePoya (~,~(~-4fO.--- Title % ~ [, %_ ~------~~ Date -~--/Z .~/cc Commission Use Only Permit Number I APl Number J Ap!)r°val"Date Isee c°ver letterfor other ~'.~ -/0'4;~ 50-O2_~'-- ,~- ~ ~ OO / ~,~-/"~0/~{.~, requirements Con~litions'of Approval: Samples Required [] Yes /~ No Mud Log Required [] Yes ~ No Hydrogen Sulfide Measures []Yes ~ No Directional Survey Required [] Yes [] No []JM; [] 0M; [] Other:,.,, ,.,,.,,,,~, ,.,,~,,~,u ,-,.y by order of5/ /~ Approved By David W. Johnston Commissioner the commission Date Form 10-401 Rev. 12-01-85 SubmiJ iplicate Shared Services Drilling Contact: James E. Robertso;~ 5 6 4-5 I 5 9 Well Name' IMP F-18 Well Plan Summary IType of Well (producer or injector)' IKUPARUK ] PRODUCER Surface Location: 1872 NSL 2820 WEL Sec 06 T13N Ri0E UM., AK Target Location: 796 NSL 4385 WEL Sec 25 T14N R09E UM., AK Bottom Hole 1006 NSL 4554 WEL Sec 25 T14N R09E UM., AK Location' IAFE Number: 1337027 I r-Rig: _LNabors 22-E IEstimated StartDate' I02JUN96 IOperating da/s [°comPlete' 116 IWell Design (conventional, slimhole, I Milne Point Ultra Slimhole Longstring 9- etc.)' I 5/8", 40# Surf~.ce X 7", 26# Longstring Formation Markers: Formation Tops MD TVD (bkb) ..... base permafrost 1,8 3 4 1,7 9 9 NA 6,472 3,990 Top of Schr~.~-~ir__ Bluff Sands (8.3 ppg) SeabeeShale 7,762 4,450 Base of Sch~'ader Bluff Sands (8.3 ppg) HRZ 14,1 07 6,892 High Resistivity Zone Top Kuparuk 14,420 7,113 Kuparuk Cap_Rock Target Sand -Target 14,628 7,259 Target SancL__~(9.6 ppg) Total Depth 15,040 7,551 uas~ng/~ uDIng Fro,( ram: Hole Csg/ Wt/Ft Grade Conn Length i Size Tbg O.D. 24" 20" 91.1# H-40 Weld 8O 12 114" 9-5/8" 40# L-80 btrc 7881 IL_ 8-1/2" 7" 26# L-80 btrc 12010 8-1/2" 7" 26# L-80 btrc- 3000 mod ,, Top Btm IVlD/TVD MD/TVD 32/32 11 2/1 1 2 31/31 7912/4503 30/30 12040/5975 2040/5975 15040/7551 Internal yield pressure of the 7" 26# casing is 7240 psi. Wors: c:_tse surface pressure would occur with a full column of gas to the reservoir at +7666 TVDSS. M~.::i~um anticipated surface pressure in this case assuming a reservoir pressure of 3060 psi is 3301 psi, well below the internal yield pressure rating of the 7" casing. Logging Program' Open Hole Logs: Surface Intermediate Final Cased Hole Logs: MWD Directional surface to TD. LWD GF;'RES (Across Schrader Bluff) N/A -- MWD Directional and LWD (GR/CDR/COi'i' N/A ___ Mudloggers are NOT required for this well. RECEIVED MAY 2 4 i996 Alaska Oil & ¢~a.,, Con~. Commission Anchorage Mud Program: Special design considerations INone-SPUD MUD Surface Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) ,, Viscosity Point gel gel Loss 8.6 50 15 8 10 9 8 ,, to to to to to to to 9.0 150 35 1 5 30 1 0 1 5 Intermediate Mud Pro)erties' N/A , I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Production Mud Properties: I LSND freshwater mud Density Marsh Yield i'0 sec 10 rain pH' Fluid (PPG) , Viscosity Point gel gel Loss 9.0 40 1 0 3 7 8.5 6 - 8 to to to to to to to 10.4 50 1 5 1 0 20 9.5 4 - 6 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional' IKOP' 1500' I~aximum Hole An[tie: Close Approach Well' Disposal: I9'1° (No Shut Ins) Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. The Milne Point reserve pit can be opened in emergencies by notifying Karen Thomas (564-4305) with request. 1. The base of the Permafrost for all wells located in the Milne Point iJnit is _+1,850' TVD. Aquifers in the Milne Point Unit have been exempted from Class I1 injection activities by the AOGCC by Aquifer Exemption Order #2 as referenced in Area Injection Order #10. There are no domestic or industrial use water wells located within one mile of the project 2. There are _+24 wells on Milne Pt. 'F' Pad. There may be additional unidentified wells within one quarter mile distance from the subject well. There are no domestic: or industrial water use wells located within one mile of the project area. 3. The wastes to be disposed of during drilling operations can be defined as "DRILLING WASTES". 4. The cement design for this well ensures that annular pumping into I~ydrocarbon zones will not occur. ..¢ , . . . . , . o o 10. 11. 12. 13. 14. 15. 16. MP F-18 Proposed Summary of Operations Drill and Set 20" Conductor. Weld a starting head on conductor ~s well as a nipple to aid in performing potential wellhead stability cement job. Prepare location for rig move. MIRU Nabors 221:: drilling rig. NU and test 20" Diverter system. Build Spud Mud. Drill a 12-1/4" surface hole as per directional plan. Run Directional MWD from surface to TD and run Gamma Ray/Resistivity LWD across Schrader E~luff sar]~.s. Run and cement 9-5/8" casing. ND 20" Diverter, NU and Test 13-5/8" BOP MU a PDC bit on a motor, with Directional MWD and LWD CDFL',.;DN (GR/RES/Dens/Neu). RIH, Drill out Float Equipment and 10' of new formation. Pe~'form Fl I- to 12.5 ppg. Drill 8.5" hole to TD as per directional plan. Run and Cement 7" Casing. Displace cement with seawater and ~-nough diesel to cover from the base of permafrost to surface. Test casing to 3500 psig. ND BOPE, NU and Test Tree. RDMO Nabors 22E drilling rig to drill next well. Perforate and Stimulate in absence of rig. Displace well with i~.1 ppg brine and set a wireline retrievable bridge plug. MIRU Nabors 4ES or Polar 1 Rig. NU & Test BOPE to 5000 psi;. Complete well with 2-7/8" tubing hookup. Install Surface Lines and Wellhouse and put the well on production. R CEIV D M~¥ 2. 4 1996 Alask~ 011 & Oas ~Jons, Commission DRILLING HAZARDS AND RISKS: Seethe updated Milne Point F-Pad Data Sheet prepared by Pete Van Dusen for information on F pad and review recent wells drilled on F Pad. Most of the trouble time on recent wells has been due to equipment mechanical problems with the surface equipment, rather than formation drilling problems. The MPU PE group MAY be perforating, hydraulic fracturing and cleaning out wells shortly after the rig drills and completes them. This will make the near rig area congested and as a result potentially hazardous. Ensure personnel use caution moving around adjacent production activities. Close Approach: There are no close approaches with producing wells associated with the drilling However, MP F-lOi (the well drilled just before this one) wii, need to unperforated, or perforated with a plug in order to satisfy close appro~ch criteria. of MP F-18. remain either Lost Circulation: There has not been any appreciable amount of lost circulation in surfa,;e hole on any of the F Pad wellls to date. Stuck Pipe Potential" Well MPF-53 was stuck coming out on the short trip at surface cssing point. Proir to this incident there was only minor indications that the gravel and coal were :~resent. It appears that we dragged the gravel up into the bottom of the curve and reduced our ability to move up or down. Then we lost the ability to circulate when the hole collapsed. Subsequent fishing operations were not successful and a very expensive BHA was lost in the hole from 2516 - 3342. If significant gravels are encountered stop and raise funnel viscosity to 150 cp viscosity immediately. Formation Pressure: The maximum expected pore pressure for this well is 9.6 ppg EMW (3.623 psi @ 7,259' TVD). There has been no injection in this region, therefore the reservoir pressure si-ould not exceed this estimate. CASING SIZE: MP F-18 9-5/8" SURFACE CASING CEMENT PROGRAM - HALLIBURTC::, 9-5/8" CIRC. TEMP 60 deg F at 2840' T'v'DSS. SPACER: 75 bbls fresh water. LEAD CEMENT TYPE: Type E Permafrost ADDITIVES: Retarder WEIGHT: 12.0 ppg APPROX NO SACKS: 1506 YIELD:2.17 ft3/sx MIX WATEr.' 11.63 gal/sk THICKENING TIME: Greater than -~i hrs at 50° F. LEAD CEMENT: ANUULAR VOLUME FROM TOP OF TA:L CEMENT TO BASE OF PERMAFROST + 30% EXCESS, AND ,~,NNULAR VOLUME FROM BASE OF PERMAFROST TO SURFAC;' + 100% EXCESS TAIL CEMENT TYPE- Premium G ADDITIVES: WEIGHT: APPROX #SACKS: FLUID LOSS: 0.2% CFR-3,0.2% HALAD-344, 2.0% CaCI2 15.8 ppg YIELD:I .15 ft3/s:~, MIX WATER: 5.0 gal/sk 608 THICKENING TIME: Greater lhan 4 hrs at 50° F. 100-150 cc FREE WATER: 0 TAIL CEMENT FROM TD TO 300' TVD ABOVE TOP OF SE.'iRADER BLUFF WELLHEAD STABILITY CEMENT TYPE' Permafrost E NOTE: WELLHEAD STABILITY CEMENT WiL._ BE PUMPED IF THE CEMENT TOP FALLS BELOW SURF/'..LE AFTER THE PUMPS ARE SHUT DOWN. ADDITIVES: Retarder WEIGHT: 12.0 ppg YIELD:2.17 ft3/sx MIX '.NATER: 11.63 gal/sk APPROX NO SACKS: 150 CENTRALIZER PLACEMENT: 1. 1 Bowspring centralizer per joint of 9-5/8" casing on bottom 15 joints of casing (15 required). 2. Place all centralizers in middle of joints using stop collars. OTHER CONSIDERATIONS: Perform lab tests on mixed cem:nt/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening ti;nes are adequate relative to pumping job requirement. Displace at 12 - 15 bpm. Mix s!:.~rry on the fly -- batch mixing is not necessary. CEMENT VOLUME: 1. The Tail Slurry volume is calculated to cover from TD to :.~00' TVD above the top of the Schrader Bluff Formation. 2. The Lead Slurry volume is anuular volume from top of t,'_-:.il cement to base of permafrost + 30% excess, and annular volume from base of perm~tf',:)st to surface + 100% excess. 3. 80'md 9-5/8", 40# capacity for float joints. 4. Wellhead stability Cement Volume is 150 sacks. It will [~ pumped if necessary to provide support to the wellhead. R C IV£D Alask~ 0il & Ga~ Cons, commission knchor~,ge MP F-18 Well 7" PRODUCTION CASINO; CEMENT PROGRAM- HALLIBURTON STAGE I CEMENT JOB ACROSS THE KUPARUK INTERVAL: CIRC. TEMP: 140° F SPACER: 20 bbls fresh water BHST 170° F at 7040' TVDSS. 70 bbls Alpha Spacer mixed as per Halliburton specifica',ions weighted to 1.0 ppg above current mud weight. CEMENT TYPE: Premium G ADDITIVES: 0.2% CFR-3, 0.1% HR-5, 0.4% Halad 344 WEIGHT: 15.8ppg YIELD: 1.15 cu ft/sk APPROX# SACKS: 205 SACKS THICKENING TIME: 3 1/2 - 4 1/2 hrs @ 140° F FLUID LOSS: < 50cc/30 min @ 140° F FREE WATER: 0cc @ 45 degree angle. CENTRALIZER PLACEMENT: , . MIX WATER: 5.0 gal/sk 7" x 8-1/4" Straight Blade Rigid Centralizers. Two per joint on the bottom 18 joints of 7" casing (36). This will cover +300' above the KUPARUK Sand. Run two (2) 7" x 8-1/4" Straight Blade Rigid Centralizers on the second full joint inside the 9-5/8" casing shoe. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud progr~lm ;,~d ensure compatibility prior to pumping job. Ensure thickening times are adequate relativo to pumping job requirement. Displace at 8-10 bpm. Batch mixing is not necessary. CEMENT VOLUME: o Stage I cement volume is calculated to cover 1000' MD above the Kuparuk Target Sand with 30% excess. SHARED SERVZCES i ii i i ii ~ ii Marker Identification MO BKB SECTN INCLN A) K8 0 0 0 0.00 B) KOP/BUILD 1/100 500 500 0 0.00 C) BUILD 1.5/100 700 700 3 2.00 D) BUILD 2/100 1000 999 26 6.50 E) BUILD 2.5/]00 1400 1392 99 14.50 F} END 2.5/100 BUILD 3584 2959 1500 69.10 G) 9-5/8" CASING POINT 7912 4503 5543 69.10 H) DROP 2/100 13023 6326 1031B 69.t0 I) END 2/~00 DROP 14228 6977 11322 45.00 J) TARGET 14628 7259 11605 45.00 K) TD 15040 7551 11896 45.00 DRIE"L'ING ' ' ~ AnadrJ ] ] Schlumberger ! MPF- J 8 (P4) VERTICAL SECTION VIEW 'Section at: 324.60 TVD Scale.: I inch : 1600 feet Dep Scale.: 1 inch = 2600 feet Drawn ..... :03/27/96 0 800 1600 2400 3200 4000 4800 5600 6400 7200 8000 8800 9600 10400 11200 12000 12800 13600 Sect ion Departure (~nadr]]] (c]96 I~F1BP4 3.0D.03 ~3:28 AN P) feet Mar-27-96 15:11 Anadrill DPC 907 344 2160 P.06 _ " ' 'ES DRZLLING F SHARED SERV'I'C i i iii i i i i i ~ ~o~/,ooo.o~ ,~ 69- ~ ~5.oo VERTICAL SECTION VIEW C) TARGET 14628 725g 11605 45.00 , D) TO 15040 7551 11896 45.00 Section at: 324.60 TVD Scale.' 1 inch * 200 feet Oep Scale.' 1 inch : 200 feet 6200 " , ' " i i ,I Drawn .... · 03/27/96 ' ' , i .... ~nadr~ 1] Sch]umberg~ /" , / APr:'ROVED ~ · . 7300- - ~ .......... 7~00 : ..... , ' . 10500 10600 I0700 10800 lOgO0 11000 11t00 11200 11300 11400 11500 1t600 11700 11800 llgO0 s2 r ' .._ Mar-27-96 15:11 Anadrill DPC 907 344 2160 P.07 ilmml S DRILLING C)B) BuILDKOP/BUILD1.5/~OOJ/lO0 500 0 N 0 ~oo ~. ~,~ PLAN VIEW O) BUILD 2/100 lO00 21 N 15 W , E) BUILD 2.5/~00 ~400 80 N 57 W CLOSURE ' 1~896 feet at Azimuth 32 F) END 2.5/~00 BUILD 3584 ~223 N 869 W G) 9-5/8' CASING POINT 7g~2 45~g N 32~ W DECLINATION.' +0.000 (E) D~OP 2/100 I3023 84~: N .5976 W SCALE ' ~ ~nch : 1500 feet J) TARGET J4628 9460 N 6722 W DRAWN ' 03/27/96 K) TD 15040 9697 N 6890 W m i JnadrY ]] SchYumberger i i i m : ........... ' ; ANADRiLI AK!~ DPC , i APPllOV~D . , .-,~., ,~ ,.:... ... ....... ............ ,, ._ · . I ' ..... ~ , ...... ~ ................. , .................. ......... . .................... ....... ~,~'a. .~, ..... ._.. " .. ..... , ........... i ........... ........ ~ ...... . ........ .. . ~ -..-] ............... . 5250 4500 3750 3000 2250 1500 750 0 750 (C)96 I~IPFIBP4 3.0b.03 ii:20 ~ P) .6O · WELL PERMIT CHECKLIST COMPANY Z~,/'O FIELD &'POOL :~Z.-S/]oC~ INIT CLASS ._~4~:,,"' ADMINISTRATION 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 13. WELL NAME ./¢'_//~,,~-/'~(~:~ PROGRAM: exp [] dev/~ redrll [] serv [] wellbore seg [] ann. disposal para req [] ./} GEOL AREA ~'~ ~3 UNIT# /.) ~ ~ ON/OFF SHORE N 'N N N N N N N N N N N N ENGINEERING Permit fee attached ....................... Lease number appropriate ................... Unique well name and number ................ Well located in a defined pool ................. Well located proper distance from drlg unit boundary .... Well located proper distance from other wells ........ Sufficient acreage available in ddlling unit .......... If deviated, is weltbore plat included ............. ~ Operator only affected party .................. Operator has appropriate bond in force ............ Permit can be issued without conservation order ...... Permit can be issued without administrative approval .... Can permit be approved before 15-day wait ......... REMARKS GEOLOGY APPR DATE 14. Conductor string provided ................... ~ N 15. Surface casing protects ail known USDWs ......... ~ N 16. CMT vol adequate to circulate on conductor & surf csg . . . (~ N 17. CMT vol adequate to tie-in long string to surf csg ....... Y...~...<~ 18. CMT will cover all known productive hodzons ......... 19. Casing designs adequate for C, T, B & permafrost. ..... (~ N 20. Adequate tankage or reserve pit ................ ~ N 21. If a re-drill, has a 10-403 for abndnmnt been approved .... 22. Adequate wellbore separation proposed ........... .~ N 23. If diver[er required, is it adequate ................ (-~-~N 24. Ddlling fluid program schematic & equip list adequate .... 25. BOP Es adequate ....................... '(Y.,,) N 26. BOPE press rating adequate; test to ~z~ psig.(~l 27. Choke manifold complies w/APl RP-53 (May 84) ....... 28. Work will occur without operation shutdown ....... ~ N 29. Is presence of H2S gas probable ...... '. ' ....... '. Y' / 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N//,,g ,/~ 31. Data presented on potentiai overpressure zones ....... Y//N ,/' L-'/',~ / ! I 32. Seismic analysis of shallow gas zones ............ .~ N ' 33. Seabed condition survey (if off-shore) .......... .~.. Y N 34. Contact name/phone for weekJ~ progress report~...../'... Y N lexploratory on~yj GEOLOGY: ENGINEERING: COMMISSION: JDN~ TAB "!i Comments/instructions: g HOW/~jb - A:~ORMS'cheklist rev 4/96 Well History File APPENDIX Information of detailed nature that is not - particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Tape Subfile 2'is type: TAPE HEADER MILNE POINT UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: MPF-18 500292268100 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 24-FEB-97 MWD RUN 1 AK-MM-96630 M. WORDEN J. PYRON MWD RUN 2 A. PIEPER J. PYRON MWD RUN 3 M. HANIK D. MOUNTJOY 6 13N 10E 1872 2820 40.65 12.40 OPEN HOLE CASING DRILLERS · ~: ¢- -, {-, "1 ,U -,' ~ · · '-'-,,.,,~ BIT SIZE (IN) SIZE (IN) DEPTH (FT) ¢" ~;¢,~,f~ 0!, .,/a~,¢,~¢%~ 20. 000 110.0 12 . 250 9 . 625 7914 . 0 8 . 500 14941.0 MWD - EWR4/CNP/SLD/GR. ALL DEPTHS ARE MEASURED BIT DEPTHS. ANNULAR HYDRAULICS WERE CALCULATED USING THE POWER LAW MODEL. MWD RUNS 1 AND 2 WERE DIRECTIONAL WITH DUAL GAMMA RAY (DGR), AND ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4). MWD RUN 3 WAS DIRECTIONAL WITH DUAL GAMMA RAY (DGR), ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4), COMPENSATED NEUTRON POROSITY (CNP), AND STABILIZED LITHO DENSITY (SLD). THIS WELL REACHED A TOTAL DEPTH OF 14941' ENVIRONMENTAL PARAMETERS USED FOR NUCLEAR LOGS: HOLE SIZE: MUD FILTRATE SALINITY: MUD WEIGHT: FORM. WATER SALINITY: FLUID DENSITY: MATRIX DENSITY: LITHOLOGY: 800 ppm 8.6 - 10.1 ppg 14545 ppm 1.00 g/cc 2.65 g/cc SANDSTONE. I 66 0~9 06 ~ ~ I 66 ~66 06 ~ ~ I I0 0I£ 06 ~ 5 pon sIO dX£ clKi q;bu@q szTs s~Tu~ ssIdmes spoo IOOL ~meX :s~AxnD £I ZdOqS HL%{ON : iNIOd ZNqIM : 8I-~dM : (~ZSY~I~f) MOIL~O~IdXZ d~ : NnOD NM ND '~ZI~d~ Z~ZM SL~IHS HLdZ~ OM 0'IP6PI 0'S£6£ 0'S£6L 0'SI0P 0'SI0P 0'LPP I HLdZ~ ~ZL~IHSN/1LMZ~f~fAI~Z 0'0£8PI 0'006£ 0'I98PI 0'006£ 0'PS8PI 0'9££ 0'I88PI 0'P8£ (HLdZG ~ZKflS~ZM) ~L~G L~IHS ZAH~D :S£glHS HO~ ZA%IflD ZNIqZSV~ ~OHH IHdN ZGOD qOOi 000~' :£N~D~I -p~Bxsm sunx ~yq II~ fssAxno psddyIo pu~ p~yqs q~dsG 9 RHOB MWD 68 1 G/C3 4 10 DRHO MWD 68 1 G/C3 4 11 PEF MWD 68 1 BN/E 4 12 FET MWD 68 1 HR 4 13 ROP MWD 68 1 FPHR 4 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 1634 4 30 995 99 4 90 995 99 4 90 995 99 4 90 995 99 4 90 995 99 52 Tape File Start Depth = 15000.000000 Tape File End Depth = 300.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** · LIS representation code decoding summary: Rep Code: 68 411615 datums Tape Subfile: 2 1731 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes 0 0' : (NI) ~IZO(/_N~£S ~IOOL 000 ' O0° : (NI) NOI~D~OD ~OH 0'0£ 0'0/. 0'£A 0'0/. 006'g 0~8 'T 0£8'T 000'~ O'~T 008 0'~9 Og'6 (/fids O'OII : (i~) HIdZQ DNIS~D S,~%I~ : (NI) ~ZIS II~ H%OH NH~O ~i~ DNIS~D ~Nlf ~%OH~Off 8©~D88~Od 8©~O88~Od H~zN: ~00~ Z~IX,I, ~IOOi ZQOD ~IOOd] %{O(INZA (NOLLO~t O,l, dO£) DNI%ILS ~iOOJ] £'89 I' 0 0'810~ 0'L~ 0'810~ ~6'£ QMN II'E DSI 96-NIIP- ~0 0'L~6£ 0'SS6£ HLdZ~ dO£S SI% :sctKq s! £ aii~qnS REMARK~: CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : MPF-18 : MILNE POINT : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD- 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 995 99 1 4 90 995 99 1 4 90 640 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 246 Tape File Start Depth = 4100.000000 Tape File End Depth = 300.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 60809 datums Tape Subfile: 3 311 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 3956.0 EWR4 3948.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 7872.0 7864.0 07-JUN-96 ISC 2.11 MWD 3.94 MEMORY 7935.0 4018.0 7935.0 0 67.1 70.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 DGR DUAL GAMMA RAY $ TOOL NUMBER P0488CRG8 P0488CRG8 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 12.250 110.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: SPUD 9.60 57.0 8.8 800 6.5 2.000 1.390 1.850 2.900 70.0 70.0 70.0 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : MPF- 18 : MILNE POINT : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD ' 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 995 99 1 4 90 995 99 1 4 90 640 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 265 Tape File Start Depth = 8000.000000 Tape File End Depth = 3900.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 477224 datums Tape Subfile: 4 330 records... Minimum record length: 62 bytes Maximum record length: 998 bytes S9'~ ZNO~SQN-~S O'~7L O'~7L 0' SS'E O'~TL 009'~ 009'I 058 ' OOL'I 008 0'6 0'8~' 06'6 C[_/NIS q: 0 ' ~T6L 005'8 9©~N%IDLZS0~ 9©6N~DLZ50~ ~Z~D_AI ~00~ L'IL 0 0'I969I 0'5£6£ 0'I~6~I 96'£ GM~ II'Z DSI 96 -hind - £I :XIISN~G XIEitf~ :XI~llf~ ~oo~ ~O~An~N : (~) HidH~ DNIS~D S,~%qlHQ : (gI) ~ZIS iI~ H%OH N~dO ~i~ ©NIS~D QN-tf ~%OH~HO~ AIISNH~ OHII% ZdXL ~OOL H~OD ~OOi ~OQNZA 0'698~I 0'I98~I 0'£S85I 0'088~I HLdZ~ dOiS SIT HOLE CORRECTION (I5 8.! TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: MWD RUN 3. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : MPF-18 : MILNE POINT : NORTH SLOPE : ALASKA .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 13 Curves: Name Tool-Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 NPHI MWD 68 1 PU-S 4 7 FCNT MWD 68 1 CPS 4 8 NCNT MWD 68 1 CPS 4 9 RHOB MWD 68 1 G/C3 4 10 DRHO MWD 68 1 G/C3 4 11 PEF MWD 68 1 BN/E 4 12 FET MWD 68 1 HR 4 13 ROP MWD 68 1 FPHR 4 4 90 995 99 1 4 90 995 99 1 4 90 640 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 4 90 940 02 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 4 90 995 99 1 52 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 812 Tape File Start Depth = 15000.000000 Tape File End Depth = 7700.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 265224 datums Tape Subfile: 5 881 records... Minimum record length: Maximum r~cord"length: 62 bytes 1014 bytes Tape Subfile 6 is type: LIS 97/ 2/24 01 **** REEL TRAILER **** 97/ 2/24 01 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 24 FEB 97 1:32p Elapsed execution time = 10.49 seconds. SYSTEM RETURN CODE = 0