Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout221-116PTD: 221-116
T38534
2/28/2024Kayla Junke
Kayla
Junke
Digitally signed
by Kayla Junke
Date: 2024.02.28
09:25:17 -09'00'
TT RR AA NN SS MM II TT TT AA LL
FROM::Sandra D. Lemke, ATO-704 TO:: Meredith Guhl
ConocoPhillips Alaska, Inc. AOGCC
P.O. Box 100360 333 W. 7
th Avenue, Suite 100
Anchorage AK 99510-0360 Anchorage, Alaska
RE:CD2-361
DATE: 02/01/2024
Transmitted:
North Slope, Colville River Unit, Alaska
Via SFTP upload
Schlumberger Images
Transmittall instructions: please promptly sign, scan, and e-mail to Sandra.D.Lemke@conocophillips.com
CC: CD2-361 e-transmittal well folder
Receipt: Date:
Alaska/IT Data Services-GGRE |ConocoPhillips Alaska |Office: 907.265.6947; Mobile 907.440.4512
CD2-361
PTD: 221-116
0T38469
2/5/2024
Kayla
Junke
Digitally signed
by Kayla Junke
Date: 2024.02.05
11:05:25 -09'00'
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
Well Log Information:
Digital
Med/Frmt ReceivedStart Stop
OH /
CH Comments
Log
Media
Run
No
Electr
Dataset
Number Name
Interval
List of Logs Obtained:GR, RES, PWD, DIR, AZI, DEN, NEU, CALIPER, POR, SONIC
NoNo YesMud Log Samples Directional Survey
REQUIRED INFORMATION
(from Master Well Data/Logs)
DATA INFORMATION
Log/
Data
Type
Log
Scale
DF 7/5/20232 34488 Electronic Data Set, Filename: CD2-
361_Recorded_Mode_Drilling_Mechanics_Depth
_MD.las
37804ED Digital Data
DF 7/5/202344905 44908 Electronic Data Set, Filename: CD2-
361_Drilling_Mechanics_Time_RM_LWD001.las
37804ED Digital Data
DF 7/5/202344915 44917 Electronic Data Set, Filename: CD2-
361_Drilling_Mechanics_Time_RM_LWD002.las
37804ED Digital Data
DF 7/5/202344917 44924 Electronic Data Set, Filename: CD2-
361_Drilling_Mechanics_Time_RM_LWD003.las
37804ED Digital Data
DF 7/5/202344930 44937 Electronic Data Set, Filename: CD2-
361_Drilling_Mechanics_Time_RM_LWD004.las
37804ED Digital Data
DF 7/5/202344944 44957 Electronic Data Set, Filename: CD2-
361_Drilling_Mechanics_Time_RM_LWD005.las
37804ED Digital Data
DF 7/5/202344968 44976 Electronic Data Set, Filename: CD2-
361_Drilling_Mechanics_Time_RM_LWD006.las
37804ED Digital Data
DF 7/5/202344982 44997 Electronic Data Set, Filename: CD2-
361_Drilling_Mechanics_Time_RM_LWD007.las
37804ED Digital Data
DF 7/5/202322046 23875 Electronic Data Set, Filename: CD2-
361_Drilling_Mechanics_Time_RM_LWD008.las
37804ED Digital Data
DF 7/5/202345010 45019 Electronic Data Set, Filename: CD2-
361_Drilling_Mechanics_Time_RM_LWD009.las
37804ED Digital Data
DF 7/5/202345020 45040 Electronic Data Set, Filename: CD2-
361_Drilling_Mechanics_Time_RM_LWD010.las
37804ED Digital Data
DF 7/5/202312366 18468 Electronic Data Set, Filename: CD2-
361_VISION_Service_RM_LWD005.las
37804ED Digital Data
DF 7/5/2023308 13595 Electronic Data Set, Filename: CD2-
361_VISION_Service_RM_LWD005_BROOH.las
37804ED Digital Data
Wednesday, September 20, 2023AOGCC Page 1 of 31
PB1
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/5/20236283 12606 Electronic Data Set, Filename: CD2-
361_VISION_Resistivity_RM_LWD004.las
37804ED Digital Data
DF 7/5/20236300 12602 Electronic Data Set, Filename: CD2-
361_VISION_Resistivity_RM_LWD004_MAD_pas
s.las
37804ED Digital Data
DF 7/5/20232366 2483 Electronic Data Set, Filename: CD2-
361_VISION_Resistivity_RM__LWD002.las
37804ED Digital Data
DF 7/5/20232382 6444 Electronic Data Set, Filename: CD2-
361_VISION_Resistivity_RM__LWD003.las
37804ED Digital Data
DF 7/5/20236288 6423 Electronic Data Set, Filename: CD2-
361_VISION_Resistivity_RM__LWD003_MAD_P
ass.las
37804ED Digital Data
DF 7/5/202350 2483 Electronic Data Set, Filename: CD2-
361_VISION_Resistivity_RM__LWD001.las
37804ED Digital Data
DF 7/5/202350 2449 Electronic Data Set, Filename: CD2-
361_VISION_Resistivity_RM__LWD001_MAD_P
ass.las
37804ED Digital Data
DF 7/5/202320400 22169 Electronic Data Set, Filename: CD2-
361_VISION_Service_RM_LWD007.las
37804ED Digital Data
DF 7/5/2023204 22162 Electronic Data Set, Filename: CD2-
361_VISION_Service_RM_LWD007_MAD_Pass.l
as
37804ED Digital Data
DF 7/5/202322062 23874 Electronic Data Set, Filename: CD2-
361_VISION_Service_RM_LWD008.las
37804ED Digital Data
DF 7/5/202322683 22790 Electronic Data Set, Filename: CD2-
361_VISION_Service_RM_LWD008_MAD_Pass.l
as
37804ED Digital Data
DF 7/5/202323845 27240 Electronic Data Set, Filename: CD2-
361_VISION_Service_RM_LWD009.las
37804ED Digital Data
DF 7/5/202327093 34487 Electronic Data Set, Filename: CD2-
361_VISION_Service_RM_LWD010.las
37804ED Digital Data
DF 7/5/202320400 34479 Electronic Data Set, Filename: CD2-
361_VISION_Service_RM_LWD010_MAD_Pass.l
as
37804ED Digital Data
DF 7/5/202320400 22169 Electronic Data Set, Filename: CD2-
361_VISION_Service_RT_LWD007.las
37804ED Digital Data
Wednesday, September 20, 2023AOGCC Page 2 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/5/202318395 20447 Electronic Data Set, Filename: CD2-
361_VISION_Service_Recorded_Mode_LWD006.
las
37804ED Digital Data
DF 7/5/202312 34487 Electronic Data Set, Filename: CD2-
361_VISION_Service_RM_50ft-34487ft.las
37804ED Digital Data
DF 7/5/20232 34487 Electronic Data Set, Filename: CD2-
361_VISION_Service_Real_Time_Composite.las
37804ED Digital Data
DF 7/5/202316286 20646 Electronic Data Set, Filename:
CPAI_CD2_361_SonicScope475_Realtime_TOC
_16286ft_20646ft_LAS.las
37804ED Digital Data
DF 7/5/202316286 20646 Electronic Data Set, Filename: CD2-
361_6.75in_RT_RM_TOC_16286ft_20646ft_LAS.
las
37804ED Digital Data
DF 7/5/202320160 27241 Electronic Data Set, Filename: CPAI-CD2-
361_Microscope_20160_27241ft_MD_Logs.las
37804ED Digital Data
DF 7/5/202320461 26705 Electronic Data Set, Filename: CPAI-CD2-
361_Microscope_20440_27200ft_MD_ImageInter
pr_Dips.las
37804ED Digital Data
DF 7/5/202327262 34431 Electronic Data Set, Filename: CPAI-CD2-
361_Microscope_27200_34440ft_MD_ImageInter
pr_Dips.las
37804ED Digital Data
DF 7/5/202320410 34480 Electronic Data Set, Filename: CPAI-CD2-
361_Microscope_BROOH_20410_34480ft_Logs.l
as
37804ED Digital Data
DF 7/5/202327200 34487 Electronic Data Set, Filename: CPAI-CD2-
361_Microscope_Drill_27200_34440ft_Logs.las
37804ED Digital Data
DF 7/5/202318496 20372 Electronic Data Set, Filename: CPAI_CD2-
361_Terrasphere_EM_Dips.las
37804ED Digital Data
DF 7/5/202318250 20446 Electronic Data Set, Filename: CPAI_CD2-
361_TerraSphere_EM_Logs.las
37804ED Digital Data
DF 7/5/202318250 20447 Electronic Data Set, Filename: CPAI_CD2-
361_TerraSphere_US_Caliper_Logs.las
37804ED Digital Data
DF 7/5/202318530 20388 Electronic Data Set, Filename: CPAI_CD2-
361_Terrasphere_US_Dips.las
37804ED Digital Data
DF 7/5/202318250 20446 Electronic Data Set, Filename: CPAI_CD2-
361_TerraSphere_US_Logs.las
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-361 EOW Letter.doc37804EDDigital Data
Wednesday, September 20, 2023AOGCC Page 3 of 31
CD2-,
361_VISION_Service_RM_50ft-34487ft.las
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/5/2023 Electronic File: CD2-
361PB1_Drilling_Mechanics_Depth_RM_Compos
ite.PDF
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_Drilling_Mechanics_Time_RM_LWD001.PD
F
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_Drilling_Mechanics_Time_RM_LWD002.PD
F
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_Drilling_Mechanics_Time_RM_LWD003.PD
F
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_Drilling_Mechanics_Time_RM_LWD004.PD
F
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_Drilling_Mechanics_Time_RM_LWD005.PD
F
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_Drilling_Mechanics_Time_RM_LWD006.PD
F
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_Drilling_Mechanics_Time_RM_LWD007.PD
F
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_Drilling_Mechanics_Time_RM_LWD008.PD
F
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_Drilling_Mechanics_Time_RM_LWD009.PD
F
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_Drilling_Mechanics_Time_RM_LWD010.PD
F
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_Recorded_Mode_LWD
005.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_MADPass_Recorded_
Mode_LWD005.pdf
37804ED Digital Data
Wednesday, September 20, 2023AOGCC Page 4 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_Recorded_Mode_LW
D005.PDF
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_Recorded_Mode_LWD
005.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_MADPass_Recorded_
Mode_LWD005.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_Recorded_Mode_LW
D005.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_MADPass_Recorded_
Mode_LWD004.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_Recorded_Mode_LWD
004.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_MADPass_Recorded_
Mode_LWD004.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_Recorded_Mode_LW
D004.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_MADPass_Recorded_
Mode_LWD004.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_Recorded_Mode_LWD
004.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_MADPass_Recorded_
Mode_LWD004.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_Recorded_Mode_LW
D004.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_MADPass_Recorded_
Mode_LWD003.pdf
37804ED Digital Data
Wednesday, September 20, 2023AOGCC Page 5 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_Recorded_Mode_LWD
002.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_Recorded_Mode_LWD
003.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_MADPass_Recorded_
Mode_LWD003.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_Recorded_Mode_LW
D002.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_Recorded_Mode_LW
D003.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_MADPass_Recorded_
Mode_LWD003.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_Recorded_Mode_LWD
002.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_Recorded_Mode_LWD
003.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_MADPass_Recorded_
Mode_LWD003.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_Recorded_Mode_LW
D002.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_Recorded_Mode_LW
D003.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_MADPass_Recorded_
Mode_LWD001.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_Recorded_Mode_LWD
001.pdf
37804ED Digital Data
Wednesday, September 20, 2023AOGCC Page 6 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_MADPass_Recorded_
Mode_LWD001.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_Recorded_Mode_LW
D001.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_MADPass_Recorded_
Mode_LWD001.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_Recorded_Mode_LWD
001.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_MADPass_Recorded_
Mode_LWD001.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_Recorded_Mode_LW
D001.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: Note for BHA8 -
LWD008+LWD009.txt
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_Recorded_Mode_LWD
007.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_Recorded_Mode_LW
D007.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_Recorded_Mode_LWD
007.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_Recorded_Mode_LW
D007.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Services_2MD_LWD007_Drilling_P
ass_RT.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Services_2MD_LWD007_MAD_Pas
s_RT.pdf
37804ED Digital Data
Wednesday, September 20, 2023AOGCC Page 7 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/5/2023 Electronic File: CD2-
361_VISION_Services_5MD_LWD007_Drilling_P
ass_RT.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Services_5MD_LWD007_MAD_Pas
s_RT.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_MADPass_Recorded_
Mode_LWD008.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_Recorded_Mode_LWD
008.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_MADPass_Recorded_
Mode_LWD008.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_Recorded_Mode_LW
D008.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_MADPass_Recorded_
Mode_LWD008.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_Recorded_Mode_LWD
008.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_MADPass_Recorded_
Mode_LWD008.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_Recorded_Mode_LW
D008.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_Recorded_Mode_LWD
009.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_Recorded_Mode_LW
D009.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_Recorded_Mode_LWD
009.pdf
37804ED Digital Data
Wednesday, September 20, 2023AOGCC Page 8 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_Recorded_Mode_LW
D009.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_MADPass_Recorded_
Mode_LWD010.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_Recorded_Mode_LWD
010.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_MADPass_Recorded_
Mode_LWD010.PDF
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_Recorded_Mode_LW
D010.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_MADPass_Recorded_
Mode_LWD010.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_Recorded_Mode_LWD
010.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_MADPass_Recorded_
Mode_LWD010.PDF
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_Recorded_Mode_LW
D010.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_Recorded_Mode_LWD
006.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_Recorded_Mode_LW
D006.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_Recorded_Mode_LWD
006.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_Recorded_Mode_LW
D006.pdf
37804ED Digital Data
Wednesday, September 20, 2023AOGCC Page 9 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_Recorded_Mode.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_Recorded_Mode.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_Recorded_Mode.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_Recorded_Mode.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_MD_Real_Time_50ft-
34487ft.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_2_Inch_TVD_Real_Time_50ft-
34487ft.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_MD_Real_Time_50ft-
34487ft.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_5_Inch_TVD_Real_Time_50ft-
34487ft.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: Note for BHA8 -
LWD008+LWD009.txt
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD005.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD005.html
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD005_BROOH.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD005_BROOH.ht
ml
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD004.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD004.html
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD004_BROOH.dlis
37804ED Digital Data
Wednesday, September 20, 2023AOGCC Page 10 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD004_BROOH.ht
ml
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD002.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD002.html
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD003.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD003.html
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD003_BROOH.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD003_BROOH.ht
ml
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD001.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD001.html
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD001_BROOH.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD001_BROOH.ht
ml
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD007.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD007.html
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD007_BROOH.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD007_BROOH.ht
ml
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD007_ToolSpecific
_MicroScope.dlis
37804ED Digital Data
Wednesday, September 20, 2023AOGCC Page 11 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD007_ToolSpecific
_MicroScope.html
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD008.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD008.html
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD008_BROOH.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD008_BROOH.ht
ml
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD008_ToolSpecific
_MicroScope.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD008_ToolSpecific
_MicroScope.html
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD009.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD009.html
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD009_BROOH.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD009_BROOH.ht
ml
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD009_ToolSpecific
_MicroScope.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD009_ToolSpecific
_MicroScope.html
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD010.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD010.html
37804ED Digital Data
Wednesday, September 20, 2023AOGCC Page 12 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD010_BROOH.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD010_BROOH.ht
ml
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD010_ToolSpecific
_MicroScope.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD010_ToolSpecific
_MicroScope.html
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD006.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_VISION_Service_RM_LWD006.html
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-361_VISION
Service_Memory Drilling Data_50ft-34487ft.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-361_VISION
Service_Memory_50ft-34487ft.html
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
362_VISION_Service_Real_Time.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
362_VISION_Service_Real_Time.html
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-361 NAD27 EOW Compass
Surveys.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-361 NAD27 final survey -
Signed.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-361 NAD27 final survey
[canvas].txt
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-361 NAD27 final survey
[macro].txt
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-361 NAD27 final survey
[petrel].txt
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-361 NAD27 final survey
[surveys].txt
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-361 NAD83 EOW Compass
Surveys.pdf
37804ED Digital Data
Wednesday, September 20, 2023AOGCC Page 13 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/5/2023 Electronic File: CD2-361 NAD83 final survey
[canvas].txt
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-361 NAD83 final survey
[macro].txt
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-361 NAD83 final survey
[petrel].txt
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-361 NAD83 final survey
[surveys].txt
37804ED Digital Data
DF 7/5/2023 Electronic File: O.1007988.04_CD2-
361_Surveys.csv
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RT_1000MD.
PDF
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RT_200MD.P
DF
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RT_4000MD.
PDF
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RT_500MD.P
DF
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RT_6000MD.
PDF
37804ED Digital Data
DF 7/5/2023 Electronic File:
CPAI_CD2_361_SonicScope475_Realtime_TOC
_16286ft_20646ft_DLIS.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File:
CPAI_CD2_361_SonicScope475_Realtime_TOC
_16286ft_20646ft_PDF.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File:
CPAI_CD2_361_SonicScope475_Realtime_TOC
_16286ft_20646ft_PPT.pptx
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_6.75in_RT_RM_TOC_16286ft_20646ft_DLIS
.dlis
37804ED Digital Data
Wednesday, September 20, 2023AOGCC Page 14 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/5/2023 Electronic File: CD2-
361_6.75in_SonicScope475_RT_RM_TOC_Repo
rt_16286ft_20646ft.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_6.75in_SonicScope475_RT_RM_TOC_Repo
rt_16286ft_20646ft.pptx
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RM_1000MD.
PDF
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RM_200MD.P
DF
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RM_4000MD.
PDF
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RM_500MD.P
DF
37804ED Digital Data
DF 7/5/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RM_6000MD.
PDF
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI-CD2-
361_Microscope_20440_27200ft_MD_Images_5i
n.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI-CD2-
361_Microscope_20440_27200ft_MD_Images_60
in.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI-CD2-
361_Microscope_27200_34440ft_MD_Images_5i
n.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI-CD2-
361_Microscope_27200_34440ft_MD_Images_60
in.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI-CD2-
361_Microscope_BROOH_20410_34430ft_MD_I
mages_5in.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI-CD2-
361_Microscope_BROOH_20410_34430ft_MD_I
mages_60in.pdf
37804ED Digital Data
Wednesday, September 20, 2023AOGCC Page 15 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/5/2023 Electronic File: CPAI-CD2-
361_Microscope_BROOH_20410_34430_MD_Re
s_Image-60in.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI-CD2-
361_Microscope_BROOH_20410_34430_MD_U
HRI_Image-5in.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI-CD2-
361_Microscope_BROOH_20410_34430_MD_U
HRI_Image-60in.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI-CD2-
361_Microscope_BROOH__20410_34430_MD_R
es_Image_5in.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI-CD2-
361_Sidetrack_Microscope_20440_27200ft_MD_
Images.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI-CD2-
361_Sidetrack_Microscope_Drill_27200_34440ft_
MD_Images.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI-CD2-
361_Sidetrack_Microscope_BROOH_20410_344
30ft_MD_Images.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI_CD2-
361_Sidetrack_BROOH_Microscope_20410_344
30_MD_Res_Image.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI_CD2-
361_Sidetrack_BROOH_Microscope_20410_344
30_MD_UHRI_Image.dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI_CD2-
361_Terrasphere_Processed_Images_5in.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI_CD2-
361_Terrasphere_Processed_Images_60in.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI_CD2-
361_Terrasphere_US_Calipers_5in_60in.pdf
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI_CD2-
361_Terrasphere_EM_Processed_Images_DLIS.
dlis
37804ED Digital Data
DF 7/5/2023 Electronic File: CPAI_CD2-
361_Terrasphere_US_Processed_Images.dlis
37804ED Digital Data
Wednesday, September 20, 2023AOGCC Page 16 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/7/202350 25966 Electronic Data Set, Filename: CD2-
361PB1_Drilling_Mechanics_Depth_RM.las
37809ED Digital Data
DF 7/7/202344905 44908 Electronic Data Set, Filename: CD2-
361PB1_Drilling_Mechanics_Time_RM_LWD001.
las
37809ED Digital Data
DF 7/7/202344915 44917 Electronic Data Set, Filename: CD2-
361PB1_Drilling_Mechanics_Time_RM_LWD002.
las
37809ED Digital Data
DF 7/7/202344917 44924 Electronic Data Set, Filename: CD2-
361PB1_Drilling_Mechanics_Time_RM_LWD003.
las
37809ED Digital Data
DF 7/7/202344930 44937 Electronic Data Set, Filename: CD2-
361PB1_Drilling_Mechanics_Time_RM_LWD004.
las
37809ED Digital Data
DF 7/7/202344944 44957 Electronic Data Set, Filename: CD2-
361PB1_Drilling_Mechanics_Time_RM_LWD005.
las
37809ED Digital Data
DF 7/7/202344968 44976 Electronic Data Set, Filename: CD2-
361PB1_Drilling_Mechanics_Time_RM_LWD006.
las
37809ED Digital Data
DF 7/7/202344982 44997 Electronic Data Set, Filename: CD2-
361PB1_Drilling_Mechanics_Time_RM_LWD007.
las
37809ED Digital Data
DF 7/7/202344999 45010 Electronic Data Set, Filename: CD2-
361PB1_Drilling_Mechanics_Time_RM_LWD008.
las
37809ED Digital Data
DF 7/7/202312366 18468 Electronic Data Set, Filename: CD2-
361PB1_VISION_Service_RM_LWD005.las
37809ED Digital Data
DF 7/7/2023960 13595 Electronic Data Set, Filename: CD2-
361PB1_VISION_Service_RM_LWD005_MAD_P
ass.las
37809ED Digital Data
DF 7/7/20236283 12606 Electronic Data Set, Filename: CD2-
361PB1_VISION_Service_RM_LWD004.las
37809ED Digital Data
DF 7/7/20236300 12602 Electronic Data Set, Filename: CD2-
361PB1_VISION_Service_RM_LWD004_MAD_p
ass.las
37809ED Digital Data
DF 7/7/20232366 2483 Electronic Data Set, Filename: CD2-
361PB1_VISION_Service_RM_LWD002.las
37809ED Digital Data
Wednesday, September 20, 2023AOGCC Page 17 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/7/20232382 6444 Electronic Data Set, Filename: CD2-
361PB1_VISION_Service_RM_LWD003.las
37809ED Digital Data
DF 7/7/20236288 6423 Electronic Data Set, Filename: CD2-
361PB1_VISION_Service_RM_LWD003_MAD_P
ass.las
37809ED Digital Data
DF 7/7/202350 2483 Electronic Data Set, Filename: CD2-
361PB1_VISION_Service_RM_LWD001.las
37809ED Digital Data
DF 7/7/202350 2449 Electronic Data Set, Filename: CD2-
361PB1_VISION_Service_RM_LWD001_MAD_P
ass.las
37809ED Digital Data
DF 7/7/202320400 22169 Electronic Data Set, Filename: CD2-
361PB1_VISION_Service_RM_LWD007.las
37809ED Digital Data
DF 7/7/202320800 22162 Electronic Data Set, Filename: CD2-
361PB1_VISION_Service_RM_MADPass_LWD0
07.las
37809ED Digital Data
DF 7/7/202320400 22169 Electronic Data Set, Filename: CD2-
361PB1_VISION_Service_RT_LWD007.las
37809ED Digital Data
DF 7/7/202320800 22162 Electronic Data Set, Filename: CD2-
361PB1_VISION_Service_RT_MADPass_LWD0
07.las
37809ED Digital Data
DF 7/7/202322140 25966 Electronic Data Set, Filename: CD2-
361PB1_VISION_Service_RM_LWD008.las
37809ED Digital Data
DF 7/7/202323608 25848 Electronic Data Set, Filename: CD2-
361PB1_VISION_Service_RM_LWD008_MAD_P
ass.las
37809ED Digital Data
DF 7/7/202318395 20447 Electronic Data Set, Filename: CD2-
361PB1_RM_VISION_Services_LWD006.las
37809ED Digital Data
DF 7/7/202350 25966 Electronic Data Set, Filename: CD2-
361PB1_RM_VISION_Services_Composite.las
37809ED Digital Data
DF 7/7/202350 25966 Electronic Data Set, Filename: CD2-
361PB1_RT_VISION_Services_Composite.las
37809ED Digital Data
DF 7/7/202316286 20646 Electronic Data Set, Filename:
CPAI_CD2_361_SonicScope475_Realtime_TOC
_16286ft_20646ft_LAS.las
37809ED Digital Data
DF 7/7/202316286 20646 Electronic Data Set, Filename: CD2-
361_6.75in_RT_RM_TOC_16286ft_20646ft_LAS.
las
37809ED Digital Data
Wednesday, September 20, 2023AOGCC Page 18 of 31
CD2-,
361PB1_RM_VISION_Services_Composite.las
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/7/202320160 25966 Electronic Data Set, Filename: CPAI-CD2-
361_Microscope_20160_25966ft_MD_Logs.las
37809ED Digital Data
DF 7/7/202320461 25909 Electronic Data Set, Filename: CPAI-CD2-
361_Microscope_20440_25920ft_MD_Image_Dip
s.las
37809ED Digital Data
DF 7/7/202320134 22170 Electronic Data Set, Filename: CPAI_CD2-
361_Microscope_20134_22170ft_MD_Processed
_Drill_Logs.las
37809ED Digital Data
DF 7/7/202320461 22045 Electronic Data Set, Filename: CPAI_CD2-
361_Microscope_20240_22120ft_MD_Image_Dip
s.las
37809ED Digital Data
DF 7/7/202320755 22164 Electronic Data Set, Filename: CPAI_CD2-
361_Microscope_20755_22164ft_MD_BROOH_L
ogs.las
37809ED Digital Data
DF 7/7/202318496 20372 Electronic Data Set, Filename: CPAI_CD2-
361_Terrasphere_EM_Dips.las
37809ED Digital Data
DF 7/7/202318250 20446 Electronic Data Set, Filename: CPAI_CD2-
361_TerraSphere_EM_Logs.las
37809ED Digital Data
DF 7/7/202318250 20447 Electronic Data Set, Filename: CPAI_CD2-
361_TerraSphere_US_Caliper_Logs.las
37809ED Digital Data
DF 7/7/202318530 20388 Electronic Data Set, Filename: CPAI_CD2-
361_Terrasphere_US_Dips.las
37809ED Digital Data
DF 7/7/202318250 20446 Electronic Data Set, Filename: CPAI_CD2-
361_TerraSphere_US_Logs.las
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1 EOW Letter.doc37809EDDigital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_Drilling_Mechanics_Depth_RM.PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_Drilling_Mechanics_Time_RM_LWD001.
PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_Drilling_Mechanics_Time_RM_LWD002.
PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_Drilling_Mechanics_Time_RM_LWD003.
PDF
37809ED Digital Data
Wednesday, September 20, 2023AOGCC Page 19 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/7/2023 Electronic File: CD2-
361PB1_Drilling_Mechanics_Time_RM_LWD004.
PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_Drilling_Mechanics_Time_RM_LWD005.
PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_Drilling_Mechanics_Time_RM_LWD006.
pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_Drilling_Mechanics_Time_RM_LWD007.
PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_Drilling_Mechanics_Time_RM_LWD008.
PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1_VISION
Service_2_inch_MD_Recorded_Mode_LWD005.p
df
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1_VISION
Service_2_Inch_TVD_MADPass_Recorded_Mod
e_LWD005.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1_VISION
Service_2_Inch_TVD_Recorded_Mode_LWD005.
PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1_VISION
Service_5_Inch_MD_Recorded_Mode_LWD005.
pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1_VISION
Service_5_Inch_TVD_MADPass_Recorded_Mod
e_LWD005.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1_VISION
Service_5_Inch_TVD_Recorded_Mode_LWD005.
pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_2_inch_MD_MADPass
_Recorded_Mode_LWD005.PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_5_inch_MD_MADPass
_Recorded_Mode_LWD005.PDF
37809ED Digital Data
Wednesday, September 20, 2023AOGCC Page 20 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_MD_MADPass_Record
ed_Mode_LWD004.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_MD_Recorded_Mode_
LWD004.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_TVD_MADPAss_Recor
ded_Mode_LWD004.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_TVD_Recorded_Mode_
LWD004.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_MD_MADPass_Record
ed_Mode_LWD004.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_MD_Recorded_Mode_
LWD004.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_TVD_MADPass_Recor
ded_Mode_LWD004.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_TVD_Recorded_Mode_
LWD004.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_MD_MADPass_Record
ed_Mode_LWD003.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_MD_Recorded_Mode_
LWD002.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_MD_Recorded_Mode_
LWD003.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_TVD_MADPass_Recor
ded_Mode_LWD003.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_TVD_Recorded_Mode_
LWD002.pdf
37809ED Digital Data
Wednesday, September 20, 2023AOGCC Page 21 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_TVD_Recorded_Mode_
LWD003.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_MD_MADPass_Record
ed_Mode_LWD003.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_MD_Recorded_Mode_
LWD002.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_MD_Recorded_Mode_
LWD003.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_TVD_MADPass_Recor
ded_Mode_LWD003.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_TVD_Recorded_Mode_
LWD002.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_TVD_Recorded_Mode_
LWD003.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_MD_MADPass_Record
ed_Mode_LWD001.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_MD_Recorded_Mode_
LWD001.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_TVD_MADPass_Recor
ded_Mode_LWD001.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_TVD_Recorded_Mode_
LWD001.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_MD_MADPass_Record
ed_Mode_LWD001.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_MD_Recorded_Mode_
LWD001.pdf
37809ED Digital Data
Wednesday, September 20, 2023AOGCC Page 22 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_TVD_MADPass_Recor
ded_Mode_LWD001.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_TVD_Recorded_Mode_
LWD001.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_2_Inch_MD_MADPass
_Real_Time_LWD007.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_2_Inch_MD_Real-
time_LWD007.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_2_Inch_MD_Recorded
_Mode_LWD007.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_2_Inch_TVD_MADPas
s_Real_Time_LWD007.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_2_inch_TVD_Real_Ti
me_LWD007.PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_2_Inch_TVD_Recorde
d_Mode_LWD007.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_5_Inch_MD_MADPass
_Real_Time_LWD007.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_5_Inch_MD_Real_Tim
e_LWD007.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_5_Inch_MD_Recorded
_Mode_LWD007.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_5_Inch_TVD_MADPas
s_Real_Time_LWD007.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_5_Inch_TVD_Real_Ti
me_LWD007.pdf
37809ED Digital Data
Wednesday, September 20, 2023AOGCC Page 23 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_5_Inch_TVD_Recorde
d_Mode_LWD007.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_MD_MADPass_Record
ed_Mode_LWD008.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_MD_Recorded_Mode_
LWD008.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_TVD_MADPass_Recor
ded_Mode_LWD008.PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_TVD_Recorded_Mode_
LWD008.PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_MD_MADPass_Record
ed_Mode_LWD008.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_MD_Recorded_Mode_
LWD008.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_TVD_MADPass_Recor
ded_Mode_LWD008.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_TVD_Recorded_Mode_
LWD008.PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_MD_Recorded_Mode_
LWD006.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_2_Inch_TVD_Recorded_Mode_
LWD006.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_MD_Recorded_Mode_
LWD006.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_5_Inch_TVD_Recorded_Mode_
LWD006.pdf
37809ED Digital Data
Wednesday, September 20, 2023AOGCC Page 24 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/7/2023 Electronic File: CD2-361PB1_VISION
Service_2_Inch_MD_Recorded Mode.PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1_VISION
Service_2_Inch_TVD_Recorded_Mode.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1_VISION
Service_5_Inch_MD_Recorded Mode.PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1_VISION
Service_5_Inch_TVD_Recorded_Mode.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RT_2TVD_50ft-
25966ft.PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RT_5MD_50ft-
25966ft.PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RT_5TVD_50ft-
25966ft.PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD001.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD001.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD001_BROOH
.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD001_BROOH
.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD002.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD002.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD003.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD003.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD003_BROOH
.dlis
37809ED Digital Data
Wednesday, September 20, 2023AOGCC Page 25 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD003_BROOH
.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD004.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD004.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD004_BROOH
.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD004_BROOH
.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD005.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD005.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD005_BROOH
.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD005_BROOH
.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD006.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD006.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD007.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD007.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD007_BROOH
.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD007_BROOH
.html
37809ED Digital Data
Wednesday, September 20, 2023AOGCC Page 26 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD007_ToolSp
ecific_MicroScope.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD007_ToolSp
ecific_MicroScope.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RT_LWD007.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RT_LWD007.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RT_MADPass_LWD0
07.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RT_MADPass_LWD0
07.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD008.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD008.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD008_BROOH
.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD008_BROOH
.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD008_ToolSp
ecific_MicroScope.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RM_LWD008_ToolSp
ecific_MicroScope.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RTRM_Composite.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_RTRM_Composite.htm
l
37809ED Digital Data
Wednesday, September 20, 2023AOGCC Page 27 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_Real_Time_50ft-
25966ft.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361PB1_VISION_Service_Real_Time_50ft-
25966ft.html
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1 NAD27 EOW
Compass Surveys.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1 NAD27 final
survey - Signed.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1 NAD27 final survey
[canvas].txt
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1 NAD27 final survey
[macro].txt
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1 NAD27 final survey
[petrel].txt
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1 NAD27 final survey
[surveys].txt
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1 NAD83 EOW
Compass Surveys.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1 NAD83 final survey
[canvas].txt
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1 NAD83 final survey
[macro].txt
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1 NAD83 final survey
[petrel].txt
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-361PB1 NAD83 final survey
[surveys].txt
37809ED Digital Data
DF 7/7/2023 Electronic File: O.1007988.04_CD2-
361PB1_Surveys.csv
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RT_1000MD.
PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RT_200MD.P
DF
37809ED Digital Data
Wednesday, September 20, 2023AOGCC Page 28 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/7/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RT_4000MD.
PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RT_500MD.P
DF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RT_6000MD.
PDF
37809ED Digital Data
DF 7/7/2023 Electronic File:
CPAI_CD2_361_SonicScope475_Realtime_TOC
_16286ft_20646ft_DLIS.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File:
CPAI_CD2_361_SonicScope475_Realtime_TOC
_16286ft_20646ft_PDF.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File:
CPAI_CD2_361_SonicScope475_Realtime_TOC
_16286ft_20646ft_PPT.pptx
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361_6.75in_RT_RM_TOC_16286ft_20646ft_DLIS
.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361_6.75in_SonicScope475_RT_RM_TOC_Repo
rt_16286ft_20646ft.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361_6.75in_SonicScope475_RT_RM_TOC_Repo
rt_16286ft_20646ft.pptx
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RM_1000MD.
PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RM_200MD.P
DF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RM_4000MD.
PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RM_500MD.P
DF
37809ED Digital Data
Wednesday, September 20, 2023AOGCC Page 29 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
DF 7/7/2023 Electronic File: CD2-
361_6.75in_SonicScope475_TOC_RM_6000MD.
PDF
37809ED Digital Data
DF 7/7/2023 Electronic File: CPAI-CD2-
361_Microscope_20440_25920ft_MD_Images_5i
n.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CPAI-CD2-
361_Microscope_20440_25920ft_MD_Images_60
in.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CPAI_CD2-
361_Microscope_20900_22075ft_MD_Processed
_BROOH_Images_5in.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CPAI_CD2-
361_Microscope_20900_22075ft_MD_Processed
_BROOH_Images_60in.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CPAI_CD2-
361_Microscope_20900_22075ft_MD_Processed
_Drill_Images_5in.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CPAI_CD2-
361_Microscope_20900_22075ft_MD_Processed
_Drill_Images_60in.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CPAI-CD2-
361_Microscope_20440_25920ft_MD_Images.dli
s
37809ED Digital Data
DF 7/7/2023 Electronic File: CPAI_CD2-
361_Microscope_20240_22120ft_MD_Processed
_Drill_Images.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CPAI_CD2-
361_Microscope_20900_22075ft_MD_Processed
_BROOH_Images.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CPAI_CD2-
361_Microscope_20900_22075ft_MD_Processed
_Drill_Images.dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CPAI_CD2-
361_Terrasphere_Processed_Images_5in.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CPAI_CD2-
361_Terrasphere_Processed_Images_60in.pdf
37809ED Digital Data
DF 7/7/2023 Electronic File: CPAI_CD2-
361_Terrasphere_US_Calipers_5in_60in.pdf
37809ED Digital Data
Wednesday, September 20, 2023AOGCC Page 30 of 31
DATA SUBMITTAL COMPLIANCE REPORT
API No.50-103-20836-00-00Well Name/No.COLVILLE RIV UNIT CD2-361
Completion Status 1-OILCompletion Date 5/7/2023
Permit to Drill 2211160 Operator ConocoPhillips Alaska, Inc.
MD 34487 TVD 7184 Current Status 1-OIL
9/20/2023
UIC No
Well Cores/Samples Information:
ReceivedStart Stop Comments
Total
Boxes
Sample
Set
NumberName
Interval
INFORMATION RECEIVED
Completion Report
Production Test Information
Geologic Markers/Tops
Y
Y / NA
Y
Comments:
Compliance Reviewed By:Date:
Mud Logs, Image Files, Digital Data
Composite Logs, Image, Data Files
Cuttings Samples
Y / NA
Y
Y / NA
Directional / Inclination Data
Mechanical Integrity Test Information
Daily Operations Summary
Y
Y / NA
Y
Core Chips
Core Photographs
Laboratory Analyses
Y / NA
Y / NA
Y / NA
COMPLIANCE HISTORY
Date CommentsDescription
Completion Date:5/7/2023
Release Date:1/20/2022
DF 7/7/2023 Electronic File: CPAI_CD2-
361_Terrasphere_EM_Processed_Images_DLIS.
dlis
37809ED Digital Data
DF 7/7/2023 Electronic File: CPAI_CD2-
361_Terrasphere_US_Processed_Images.dlis
37809ED Digital Data
Wednesday, September 20, 2023AOGCC Page 31 of 31
M. Guhl 9/20/2023
t>>ED W/η^Zs/KZZη&/>ED^Zs/^Z/Wd/KE >/sZ>^Z/Wd/KE ddzW d>K''K>KZWZ/Ed^ ƐCD2-361 PB1 50-103-20837-00-00 221-116 COLVILLE RIVER MWD/LWD/DD VISION SERVICES FINAL FIELD 1dƌĂŶƐŵŝƚƚĂůZĞĐĞŝƉƚͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ yͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺWƌŝŶƚEĂŵĞ ^ŝŐŶĂƚƵƌĞ ĂƚĞWůĞĂƐĞƌĞƚƵƌŶǀŝĂĐŽƵƌŝĞƌŽƌƐŝŐŶͬƐĐĂŶĂŶĚĞŵĂŝůĂĐŽƉLJƚŽ^ĐŚůƵŵďĞƌŐĞƌ͘sdƵŽŶŐΛƐůď͘ĐŽŵ^>ƵĚŝƚŽƌͲdƌĂŶƐŵŝƚƚĂůZĞĐĞŝƉƚƐŝŐŶĂƚƵƌĞĐŽŶĨŝƌŵƐƚŚĂƚĂƉĂĐŬĂŐĞ;ďŽdž͕ĞŶǀĞůŽƉĞ͕ĞƚĐ͘ͿŚĂƐďĞĞŶƌĞĐĞŝǀĞĚĂŶĚƚŚĞĐŽŶƚĞŶƚƐŽĨƚŚĞƉĂĐŬĂŐĞŚĂǀĞďĞĞŶǀĞƌŝĨŝĞĚƚŽŵĂƚĐŚƚŚĞŵĞĚŝĂŶŽƚĞĚĂďŽǀĞ͘dŚĞƐƉĞĐŝĨŝĐĐŽŶƚĞŶƚŽĨƚŚĞƐĂŶĚͬŽƌŚĂƌĚĐŽƉLJƉƌŝŶƚƐŵĂLJŽƌŵĂLJŶŽƚŚĂǀĞďĞĞŶǀĞƌŝĨŝĞĚĨŽƌĐŽƌƌĞĐƚŶĞƐƐŽƌƋƵĂůŝƚLJůĞǀĞůĂƚƚŚŝƐƉŽŝŶƚ͘η^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞPTD: 221-116 T37809Kayla JunkeDigitally signed by Kayla Junke Date: 2023.07.07 08:53:20 -08'00'
t>>ED W/η^Zs/KZZη&/>ED^Zs/^Z/Wd/KE >/sZ>^Z/Wd/KE ddzW d>K''K>KZWZ/Ed^ ƐCD2-361 50-103-20836-00-00 221-116 COLVILLE RIVER MWD/LWD/DD VISION SERVICES FINAL FIELD 1dƌĂŶƐŵŝƚƚĂůZĞĐĞŝƉƚͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ yͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺWƌŝŶƚEĂŵĞ ^ŝŐŶĂƚƵƌĞ ĂƚĞWůĞĂƐĞƌĞƚƵƌŶǀŝĂĐŽƵƌŝĞƌŽƌƐŝŐŶͬƐĐĂŶĂŶĚĞŵĂŝůĂĐŽƉLJƚŽ^ĐŚůƵŵďĞƌŐĞƌ͘sdƵŽŶŐΛƐůď͘ĐŽŵ^>ƵĚŝƚŽƌͲdƌĂŶƐŵŝƚƚĂůZĞĐĞŝƉƚƐŝŐŶĂƚƵƌĞĐŽŶĨŝƌŵƐƚŚĂƚĂƉĂĐŬĂŐĞ;ďŽdž͕ĞŶǀĞůŽƉĞ͕ĞƚĐ͘ͿŚĂƐďĞĞŶƌĞĐĞŝǀĞĚĂŶĚƚŚĞĐŽŶƚĞŶƚƐŽĨƚŚĞƉĂĐŬĂŐĞŚĂǀĞďĞĞŶǀĞƌŝĨŝĞĚƚŽŵĂƚĐŚƚŚĞŵĞĚŝĂŶŽƚĞĚĂďŽǀĞ͘dŚĞƐƉĞĐŝĨŝĐĐŽŶƚĞŶƚŽĨƚŚĞƐĂŶĚͬŽƌŚĂƌĚĐŽƉLJƉƌŝŶƚƐŵĂLJŽƌŵĂLJŶŽƚŚĂǀĞďĞĞŶǀĞƌŝĨŝĞĚĨŽƌĐŽƌƌĞĐƚŶĞƐƐŽƌƋƵĂůŝƚLJůĞǀĞůĂƚƚŚŝƐƉŽŝŶƚ͘η^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞPTD: 221-116 T37804Kayla JunkeDigitally signed by Kayla Junke Date: 2023.07.05 10:51:33 -08'00'
1a. Well Status:Oil SPLUG Other Abandoned Suspended
1b. Well Class:
20AAC 25.105 20AAC 25.110 Development Exploratory
GINJ WINJ WDSPL No. of Completions: __________________ Service Stratigraphic Test
2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry:
Aband.:
3. Address: 7. Date Spudded: 15. API Number:
4a. Location of Well (Governmental Section): 8. Date TD Reached:
Surface:
Top of Productive Interval: 9. Ref Elevations: KB: 17. Field / Pool(s):
GL: 15.5 BF:
Total Depth: 2420' FNL, 264 FEL, Sec 8, T12N, R4E 10. Plug Back Depth MD/TVD: 18. Property Designation:
4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number:
Surface: x- y- Zone- 4
TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD:
Total Depth: x- y- Zone- 4
5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD:
Submit electronic information per 20 AAC 25.050 N/A (ft MSL)
22. Logs Obtained:
23.
BOTTOM
30" X65
137'
20" L-80 2412'
17" P110 4407'
13-5/8" L-80 5681'
9-7/8" L-80 6896'
7-5/8" L-80 20445' 7134'
4-1/2" P-110S 7121'
4-1/2" P-110S 7191'
24. Open to production or injection? Yes No 25.
26.
Was hydraulic fracturing used during completion? Yes No
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
27.
Date First Production: Method of Operation (Flowing, gas lift, etc.):
Hours Tested: Production for Gas-MCF:
Test Period
Casing Press: Calculated Gas-MCF: Oil Gravity - API (corr):
Press. 24-Hour Rate
6-3/4"
Tail: 84 bbls of 15.8ppg Class G
328
ADL 390344, ADL380093. ADL388904,
ADL388906, ADL387211, ADL387212,
ADL025530, ADL38007, AA084140
56' 137' 56'56"10 yards
29.7 18103' 6820' 10-1/4"
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
ConocoPhillips Alaska, Inc.
WAG
Gas
5/7/2023 221-116/322-508/322-640/323-128
50-103-20836-00-00
LONS 97-007
12/10/2022
34,487' MD/7,184'TVD
25966'MD/7187'TVD
70
P.O. Box 100360 Anchorage, AK 99510-0360
371464 5974180
1592 FNL, 1476FEL, Sec 22, T12N, R4E
4/13/20232181' FNL, 1770' FEL, Sec 2, T11N, R4E
5990693
1309'MD/1304'TVD
SETTING DEPTH TVD
6000595
TOP HOLE SIZE AMOUNT
PULLED
366746
357558
TOP
SETTING DEPTH MD
suspension, or abandonment; or within 90 days of acquisition of the log, whichever occurs first. Types of logs to be listed include, but are not limited to: mud
log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing
collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page only if necessary.
Colville River Field/ Alpine Oil Pool
23877'MD/7181"TVD
BOTTOM
CASING, LINER AND CEMENTING RECORD
List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion,
CASING WT. PER
FT.GRADE CEMENTING RECORD
24"
20"
Lead:645 bbls of 11ppg Class G
Tail:155 bbls of 15.8ppg Class G
2264'Lead: 382 bbls of 11ppg Class G
Tail: 98 bbls of 15.8ppg Class G
12.6
18468' 5645'
56'
20145'
6404
6-3/4"
Tail: 194 bbls of 15.8ppg Class G
17-1/2"
2319'
56'
13-1/2"
12.6 20035'
88.2
34350'
53'
7119'
133
88.1
2479'
53' 12599'
20170' 7112'
12423'
5/31/2023 24
Flow Tubing
296
1937
2801937
Gas Lift
Liner @ 20,145'MD/7,119'TVD to 34,350'MD/7,191'TVD
6915
Gas-Oil Ratio:Choke Size:
Per 20 AAC 25.283 (i)(2) attach electronic information
SIZE DEPTH SET (MD) PACKER SET (MD/TVD)If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date perf'd or liner run):
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
TUBING RECORD
20039'4.5"
Tail: 147 bbls of 15.8ppg Class G
Sr Res EngSr Pet GeoSr Pet Eng
128
N/A
32.5
Oil-Bbl: Water-Bbl:
6915
18060'MD/6811'TVD
GR, RES, PWD, DIR, AZI, DEN, NEU, CALIPER, POR, SONIC
Water-Bbl:
PRODUCTION TEST
5/28/2023
Date of Test: Oil-Bbl:
2963911129
62.8
Form 10-407 Revised 10/2022 Due within 30 days of Completion, Suspension, or Abandonment
16. Well Name and Number:
CD2-361
By Grace Christianson at 9:21 am, Jun 02, 2023
Completed
5/7/2023
JSB
RBDMS JSB 060823
ADL025529,
ADL380075 SFD
DSR-6/12/23SFD 9/20/2023 GVTL 9/21/2023
Conventional Core(s): Yes No Sidewall Cores:
30.
MD TVD
Surface Surface
1309 1304
Schrader Bluff 1062 1061
2272 2220
3186 3031
5016 4086
11205 5391
19032 7001
K1 19298 7036
20282 7129
34487 7184
(Kuparuk C)
31. List of Attachments:
32. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name: Matt Nagel
Digital Signature with Date:Contact Email:matt.b.nagel@conocophillips.com
Contact Phone:907-263-4747
General:
Item 1a:
Item 1b:
Item 4b:
Item 9:
Item 15:
Item 19:
Item 20:
Item 22:
Item 23:
Item 24:
Item 27:
Item 28:
Item 30:
Item 31:
Yes No
Well tested? Yes No
28. CORE DATA
If Yes, list intervals and formations tested, briefly summarizing test results for
each. Attach separate pages if needed and submit detailed test info including
reports and Excel or ASCII tables per 20 AAC 25.071.
NAME
Permafrost - Top
Permafrost - Base
If Yes, list formations and intervals cored (MD/TVD, From/To), and briefly summarize lithology and presence of oil, gas or water (submit separate pages if
needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071 no matter when acquired.
29. GEOLOGIC MARKERS and POOL BOUNDARIES: (list all encountered) FORMATION TESTS
Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other.
Albian 97
C-40
Kalubik
Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345),
and/or Easement (ADL 123456) number.
The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements
given in other spaces on this form and in any attachments.
The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a current well schematic
diagram with each 10-407. Submit 10-407 and attachments in PDF format to aogcc.permitting@alaska.gov. All laboratory analytical reports from
a well must be submitted to the AOGCC, no matter when the analyses are conducted per 20 AAC 25.071.
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, as-built, core
analysis, paleontological report, production or well test results, per 20 AAC 25.070.
Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
C-10
Qannik
Formation Name at TD:
TPI (Top of Producing Interval).
Authorized Name and
Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and
other tests as required including, but not limited to: core analysis, paleontological report, production or well test results.
Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29.
Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit
detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity,
permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology.
Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion,
suspension, or abandonment; or 90 days after log acquisition, whichever occurs first.
INSTRUCTIONS
Top of Productive Interval
(Kuparuk C)
Authorized Title: Drilling Engineer
Direction Survey, Operations Summary, Cementing Summary, Well Schematic
Form 10-407 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Last Rev Reason
Annotation Wellbore End Date Last Mod By
Rev Reasons: Pull SOV, Set DMY, Post Rig CD2-361 5/16/2023 oberr
Casing Strings
Csg Des OD (in) ID (in) Top (ftKB)
Set Depth
(ftKB)
Set Depth
(TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread
Conductor 30 28.00 56.8 136.8 136.7 328.00 X65 Welded
Surface 20 18.73 56.1 2,478.5 2,411.8 133.00 L80 TER
Liner 17 16.00 2,319.3 6,404.0 4,407.2 88.10 P110-IC TSH 521
Intermediate 13 5/8 12.38 52.8 12,599.0 5,681.4 88.20 L-80 IC H563
Liner 9 7/8 8.63 12,423.3 18,468.0 6,895.9 62.80 L-80 TSH 563
Liner 7 5/8 6.88 18,103.4 20,445.0 7,134.4 29.70 L-80 TSH 523
Liner 4 1/2 3.91 20,034.8 20,169.6 7,121.0 12.60 P-110S H563
Liner 4 1/2 3.91 20,145.0 34,350.0 7,190.8 12.60 P-110S H563
Tubing Strings: string max indicates LONGEST segment of string
Top (ftKB)
48.9
Set Depth …
20,038.7
Set Depth …
7,112.0
String Ma…
4 1/2
Tubing Description
Tubing – Completion Upper
Wt (lb/ft)
12.60
Grade
L-80
Top Connection
H563
ID (in)
3.96
Completion Details: excludes tubing, pup, space out, thread, RKB...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal
ID (in)
48.9 48.9 0.00 Hanger 13.625 CIW 5" Hanger HYD 563, TBG,
SSMC, 13 5/8"X5", Min ID 3.9"
Camero
n
SSMC 3.900
2,188.9 2,141.3 19.14 Nipple - DB 5.000 Nipple, Landing, 5", "DB-6", 3.813",
H563
SLB DB 3.810
4,138.4 3,681.6 56.06 Mandrel – GAS
LIFT
5.000 GLM #1, 5" x 1" KBG4-5, 24.1#
H563
SLB KBG4-5 3.940
5,360.4 4,191.3 76.47 Nipple - X 4.500 Nipple, Landing, 4 1/2", "X", 3.813",
H563
Halliburt
on
X3.812
5,365.8 4,192.5 76.54 Mandrel – GAS
LIFT
4.500 GLM#2, Silverwell Smart w/ DHG 4-
1/2, 12.6#, L-80, Vam Top
Silverwel
l GLM
Dial
w/DHG
3.898
5,373.6 4,194.3 76.63 Nipple -
Polished
Receptacle
4.500 3.813" ID Polished bore Joint,Pup, 4
1/2", 12.6#, L80, H563
3.812
6,056.6 4,337.0 77.64 Mandrel – GAS
LIFT
4.500 GLM #3, 4-1/2" x 1" KBG4-5 12.6#
H563
SLB KBG4-5 3.865
17,914.9 6,780.9 77.93 Nipple - DB 4.500 Nipple, Landing, 4 1/2", "DB",
3.750", H563
3.747
17,920.8 6,782.1 77.92 Mandrel – GAS
LIFT
4.500 GLM#4, Silverwell Smart w/ DHG 4-
1/2, 12.6#, L-80, Vam Top
Silverwel
l GLM
Dial
w/DHG
3.899
17,928.6 6,783.7 77.90 Nipple -
Polished
Receptacle
4.500 Joint,Pup, 3.750" ID Polished bore, 4
1/2", 12.6#, L80, H563
3.748
17,993.4 6,797.3 77.97 Sleeve - Sliding 4.500 Sliding Sleeve, CMU, 4.5" x 3.688"
DB profile, H563, Up to open
Baker 3.680
18,059.5 6,811.0 78.06 Packer 8.630 Baker Premier Packer w/ Striker
Packer, 4.5" x 9-7/8", 12.6# L-80
TSH 563 BxP
Baker 3.940
18,135.4 6,826.6 78.15 Nipple - DB 4.500 Nipple, Landing, 4.5", "DB-6",
3.563", H563
SLB 3.563
20,018.5 7,110.6 86.07 Nipple -
Seating
4.500 Ball Seat Sub (3.45" Ball Seat for
3.5" Ball) Baker
Baker 3.450
20,029.2 7,111.3 86.06 Locator 4.500 Knob Locator 4-1/2" 12.6# TXP BxP
(6.38" OD)
Baker 3.890
20,035.4 7,111.7 86.06 Shoe - Mule 4.500 HES Self orienting shoe/ Joint, Pup,
4 1/2", 12.6#, L80, H563
HES 3.930
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (ftKB)
Top (TVD)
(ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in)
20,145.0 7,119.3 86.02 FISH One friction block (0.594”H x
0.750”W x 6.000”L), and one
friction block retainer (0.375”H
x 0.672”W x 1.00”L), left
somewhere below 4.5 TOL in
liner most likely below 20,145'.
4/28/2023 0.000
20,145.0 7,119.3 86.02 FISH Three compression springs
from liner hanger running tool.
(0.420” OD x 1.25”L left
somewhere below 4.5 TOL in
liner most likely below 20,145'
4/28/2023 0.000
20,145.0 7,119.3 86.02 FISH One shoulder bolt from liner
hanger running tool (0.313”
max OD x 1.334”L) left
somewhere below 4.5 TOL in
liner most likely below 20,145'
4/28/2023 0.000
FISH 1 Cavin slip die. 3.5" wide x
6.75" long x .5" thick with
radius to fit 4.5" pipe. Dropped
during upper completion run at
9,556'. Decision made to
continue run upper completion.
Would most likey stay in the
13-5/8" x 4-1/2" section.
5/3/2023 0.000
Mandrel Inserts : excludes pulled inserts
Top (ftKB)
Top (TVD)
(ftKB)
Top
Incl (°)
St
ati
on
No
/S Serv
Valve
Type
Latch
Type
OD
(in)
TRO Run
(psi) Run Date Com Make Model
Port
Size (in)
4,138.4 3,681.6 56.06 1 GAS LIFT DMY BK 1 5/15/2023 KBG4-5
HORIZONTAL, CD2-361, 5/23/2023 2:26:22 PM
Vertical schematic (actual)
Liner; 20,145.0-34,350.0
Liner; 18,103.4-20,445.0
Liner; 20,034.8-20,169.6
Liner Cement; 18,790.0 ftKB
Liner; 12,423.3-18,468.0
Nipple - DB; 18,135.4
Packer; 18,059.5
Sleeve - Sliding; 17,993.4
Mandrel – GAS LIFT; 17,920.8
Nipple - DB; 17,914.9
Intermediate String 3 Cement;
17,260.0 ftKB
Intermediate; 52.8-12,599.0
Intermediate String 2 Cement;
11,406.0 ftKB
Liner; 2,319.3-6,404.0
Mandrel – GAS LIFT; 6,056.6
Mandrel – GAS LIFT; 5,365.8
Nipple - X; 5,360.4
Intermediate String 1 Cement;
2,319.3 ftKB
Mandrel – GAS LIFT; 4,138.4
Surface; 56.1-2,478.5
Nipple - DB; 2,188.9
20" Casing Cement; 56.1 ftKB
Conductor; 56.7-136.7
Hanger; 48.9
WNS PROD
KB-Grd (ft)
54.53
RR Date Other Elev…
CD2-361
...
TD
Act Btm (ftKB)
34,487.0
Well Attributes
Field Name
FIORD WEST KUPARUK
Wellbore API/UWI
501032083600
Wellbore Status
PROD
Max Angle & MD
Incl (°)
93.03
MD (ftKB)
34,398.45
WELLNAME WELLBORECD2-361
Annotation End DateH2S (ppm) DateComment
Mandrel Inserts : excludes pulled inserts
Top (ftKB)
Top (TVD)
(ftKB)
Top
Incl (°)
St
ati
on
No
/S Serv
Valve
Type
Latch
Type
OD
(in)
TRO Run
(psi) Run Date Com Make Model
Port
Size (in)
5,365.8 4,192.5 76.54 2 GAS LIFT GAUG
E
5/5/2023 Silverwe
ll Dial
6,056.6 4,337.0 77.64 3 GAS LIFT DMY BK 1 5/5/2023 KBG4-5
17,920.8 6,782.1 77.92 4 GAS LIFT GAUG
E
5/5/2023 Silverwe
ll Dial
Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal ID
(in)
6,271.3 4,380.8 78.60 Landing Collar 17.300 Weatherford Dual Valve Non-
Rotating landing collar
Weatherf
ord
DVL 14.750
18,333.4 6,867.5 77.98 Collar - Landing 9.875 Baker HP LFC Type 1 landing
Collar w/Ball Catcher
Baker 8.530
18,103.4 6,820.1 78.13 Packer 7.625 TIW Expander w/4' Tie Back
Extension (TOL = 18,103')
DrilQuip CX 7.750
20,172.6 7,121.2 86.02 Collar - Landing 7.625 7-5/8" 29.7# L-80 IC Drill-Quip
Landing Collar Hydril 523
DrilQuip PDC-II 6.860
HORIZONTAL, CD2-361, 5/23/2023 2:26:23 PM
Vertical schematic (actual)
Liner; 20,145.0-34,350.0
Liner; 18,103.4-20,445.0
Liner; 20,034.8-20,169.6
Liner Cement; 18,790.0 ftKB
Liner; 12,423.3-18,468.0
Nipple - DB; 18,135.4
Packer; 18,059.5
Sleeve - Sliding; 17,993.4
Mandrel – GAS LIFT; 17,920.8
Nipple - DB; 17,914.9
Intermediate String 3 Cement;
17,260.0 ftKB
Intermediate; 52.8-12,599.0
Intermediate String 2 Cement;
11,406.0 ftKB
Liner; 2,319.3-6,404.0
Mandrel – GAS LIFT; 6,056.6
Mandrel – GAS LIFT; 5,365.8
Nipple - X; 5,360.4
Intermediate String 1 Cement;
2,319.3 ftKB
Mandrel – GAS LIFT; 4,138.4
Surface; 56.1-2,478.5
Nipple - DB; 2,188.9
20" Casing Cement; 56.1 ftKB
Conductor; 56.7-136.7
Hanger; 48.9
WNS PROD CD2-361
...
WELLNAME WELLBORECD2-361
Page 1/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
5/3/2022
00:00
5/3/2022
06:00
6.00 MIRU, MOVE PULD P L/D 5-7/8" drillpipe from derrick, clean
rinse and dope box and pin ends for
transport to Deadhorse.
0.0 0.0
5/3/2022
06:00
5/3/2022
12:00
6.00 MIRU, MOVE PULD P L/D 5-7/8" drillpipe from derrick, clean
rinse and dope box and pin ends for
transport to Deadhorse.
0.0 0.0
5/3/2022
12:00
5/3/2022
18:00
6.00 MIRU, MOVE MOB P Clean all sumps and ship out remaining
fluid in pits to vac trucks. Separate
electrical/hydrualic interconnects
between modules. R/D Magtech and
tank farm piping to the rig. R/D Magtech
vac units and secure for move.
Pad elevation surveyed 15.50 BPMSL
0.0 0.0
5/3/2022
18:00
5/4/2022
00:00
6.00 MIRU, MOVE MOB P Continue breaking interconnects to
modules, prepare location for move.
0.0 0.0
5/4/2022
00:00
5/4/2022
06:00
6.00 MIRU, MOVE MOB P Continue breaking interconnects to
modules, prepare location for move.
Begin separating modules. Move Gen
module to southeast corner of pad.
Begin pulling drill module away from
BOP module.
0.0 0.0
5/4/2022
06:00
5/4/2022
12:00
6.00 MIRU, MOVE MOB P Separate and move pump module, pit
module and CPU to southeast corner of
pad. Separate pipeshed and pull
forward. Prepare drilling module for
move.
0.0 0.0
5/4/2022
12:00
5/4/2022
18:00
6.00 MIRU, MOVE MOB P Prepare drilling module for move
troubleshoot electrical drives. Skid rig
floor to drill module, un pin BOP module.
0.0 0.0
5/4/2022
18:00
5/5/2022
00:00
6.00 MIRU, MOVE MOB P Continue unpin BOP module run
stompers on BOP and Drill module.
Replace contacts on drill module drive
motors. Unpin Drill module and BOP
module, Lift drill module and prepare to
pull away from BOP module. Pull away
from BOP module and turn south.
0.0 0.0
5/5/2022
00:00
5/5/2022
06:00
6.00 MIRU, MOVE MOB P Lift drill module and pull away from
BOP module. Continue to troubleshoot
drill module electrical problems with
drive system. Stage drill Mod in front of
pipeshed.
0.0 0.0
5/5/2022
06:00
5/5/2022
12:00
6.00 MIRU, MOVE MOB P Jack BOP MOD pin NES to BOP MPD
CoMan and pad operator witness. Pull
BOP MOD off of well. Break down
surface bag and high speed adapter.
Cut conductor and cellar to correct
height.
0.0 0.0
5/5/2022
12:00
5/5/2022
18:00
6.00 MIRU, MOVE MOB P Make up surface riser and high speed
adapter on stump in BOP MOD. Spot
BOP MOD over wll CD2-361. Unable to
level BOP MOD.
0.0 0.0
5/5/2022
18:00
5/6/2022
00:00
6.00 MIRU, MOVE MOB P Jack BOP MOD back on tires, hook up
NES and pull BOP MOD away from
well. Remove rig matting and use roads
and pads to level out the area around
the conductor. Verify level, Replace
herculite and matting and spot BOP
Mod over CD2-361. Center over well
and level.
0.0 0.0
5/6/2022
00:00
5/6/2022
06:00
6.00 MIRU, MOVE MOB P Continue set and level BOP Mod over
well, drive drilling module and line up
with BOP mod. Move Pipe shed to
southeast side of location. Clean up old
Herculite from CD2-310 and stuff into
Mud boxes for disposal.
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 2/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
5/6/2022
06:00
5/6/2022
12:00
6.00 MIRU, MOVE MOB P Spot drilling Mod behind BOP Mod and
position and Pin to BOP Mod.
0.0 0.0
5/6/2022
12:00
5/6/2022
18:00
6.00 MIRU, MOVE MOB P Shim and level BOP Mod and drill
Mod.Clear 3" of gravel with Jack
hammers from pad for BOP module
stompers.
0.0 0.0
5/6/2022
18:00
5/7/2022
00:00
6.00 MIRU, MOVE MOB P Spot pipeshed . Continue remove frozen
gravel for BOP Mod stompers. Lay rig
matting out for pipeshed and CPU.
0.0 0.0
5/7/2022
00:00
5/7/2022
06:00
6.00 MIRU, MOVE MOB P Continue chipping frozen rocks for
stompers. Run stompers down secure
BOP module.
Level and shim BOP module. Install
lower braces. Stomp pipeshed module
into place.
0.0 0.0
5/7/2022
06:00
5/7/2022
12:00
6.00 MIRU, MOVE MOB P Continue walking pipeshed into place.
Skid rig floor over BOP Mod, un level
due to pad grade, skid floor back to
transition position. Stomp pipe shed
back away from drill module to allow
room to shim drill module. Set up
transition and shoot grade from BOP
mod to drill mod, 5" grade drop noted
from front of drill mod to back of BOP
mod. Raise front of drill mod and shim
as needed.
0.0 0.0
5/7/2022
12:00
5/7/2022
18:00
6.00 MIRU, MOVE MOB P Continue shim drill mod with rig mat and
plywood monitoring level and check for
compression risk. PJSM skid rig floor
over BOP mod lower set back stompers
and apply 500 psi hyd pressure. Back
pit mod into place, lay out Herculite and
rig mats, walk pit mode to final position.
0.0 0.0
5/7/2022
18:00
5/8/2022
00:00
6.00 MIRU, MOVE MOB P Back CPU as close as possible with
Sow, then walk into place with stompers
and shim with pipeshed module. Stomp
pump room module into place. Begin
hooking interconnects between Drill Sub
and pits.
0.0 0.0
5/8/2022
00:00
5/8/2022
06:00
6.00 MIRU, MOVE MOB P Continue stomping pump room module
into place. Continue hooking
interconnects between Drill Sub and
pits. Stomp Gen module in place.
Continued work around location to clean
up and get materials stacked and stored
as needed.
0.0 0.0
5/8/2022
06:00
5/8/2022
12:00
6.00 MIRU, MOVE MOB P Continue with interconnects, electricians
connecting plug boards and gas lines,
install steam traps and inspect all lines.
Test gas alarms. Grind conductor
housing level.
0.0 0.0
5/8/2022
12:00
5/8/2022
18:00
6.00 MIRU, MOVE RURD P Rig accepted at 12:00.
Continue with rig up , turn on steam, air,
water, swap rig power to high line. at
14:00 hrs. Install 30" sliplock connector
on riser and torque up.
0.0 0.0
5/8/2022
18:00
5/9/2022
00:00
6.00 MIRU, MOVE RURD P Clean and clear rig floor. Commission
PS21 slips. Install Cameron riser
adapter and set 12' riser joint test seal
on adapter to 500 PSI for 15 minutes.
Clean under rig floor in drip pan area.
Pressure wash wind walls.
0.0 0.0
5/9/2022
00:00
5/9/2022
06:00
6.00 MIRU, MOVE OTHR P Continue to pressure wash windwalls
and clean rig floor. Continue cleaning rig
floor and BOP deck.
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 3/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
5/9/2022
06:00
5/9/2022
12:00
6.00 MIRU, MOVE OTHR P Continue washing wind walls, rig floor
and rotary table, CPU, PITS, BOP deck.
reassemble mud pumps for flushing with
soap.
Fuel gas online.
0.0 0.0
5/9/2022
12:00
5/9/2022
18:00
6.00 MIRU, MOVE OTHR P Continue washing wind walls, rig floor
and rotary table, CPU, PITS, BOP deck.
reassemble mud pumps for flushing with
soap.
0.0 0.0
5/9/2022
18:00
5/10/2022
00:00
6.00 MIRU, MOVE OTHR P Continue washing wind walls, rig floor
and rotary table, CPU, PITS, BOP deck.
reassemble mud pumps for flushing with
soap.
Flush low pressure lines in pits with
Deep Clean.
0.0 0.0
5/10/2022
00:00
5/10/2022
06:00
6.00 MIRU, MOVE OTHR P Continue washing wind walls,
Flush low pressure lines in pits with
Deep Clean.
Clean pipeshed and boiler room.
Pick up HDPE pipe from CD2-310 area.
0.0 0.0
5/10/2022
06:00
5/10/2022
12:00
6.00 MIRU, MOVE OTHR P Continue washing wind walls and
derrick legs clean top drive.
0.0 0.0
5/10/2022
12:00
5/10/2022
18:00
6.00 MIRU, MOVE OTHR P Continue cleaning rig floor, pump room
and mud pits. Wash sun deck and sub
module. flush mud pumps with deep
clean. Mud line bleeders and flowline.
Blow down jet line mud pumps and mud
line.
0.0 0.0
5/10/2022
18:00
5/11/2022
00:00
6.00 MIRU, MOVE OTHR P Continue cleaning rig floor, pump room
and mud pits. Wash sun deck and sub
module. Sub module roof.
0.0 0.0
5/11/2022
00:00
5/11/2022
06:00
6.00 MIRU, MOVE OTHR P Continue cleaning rig floor, pump room
and mud pits. Clean top drive & blocks.
0.0 0.0
5/11/2022
06:00
5/11/2022
12:00
6.00 MIRU, MOVE OTHR P Continue cleaning the rig floor, pipe
shed & BOP deck. Flush corrosion
inhibitor through mud pumps & surfaces
lines.
0.0 0.0
5/11/2022
12:00
5/11/2022
18:00
6.00 MIRU, MOVE OTHR P Clean pump room, pipe shed, BOP deck
& cellar area. Flush corrosion inhibitor
through mix, hole fill, & transfer pumps.
Flush MSG & CPU with corrosion
inhibitor. Blow down and drain all
pumps. Off load all fluid.
0.0 0.0
5/11/2022
18:00
5/12/2022
00:00
6.00 MIRU, MOVE OTHR P Continue cleaning pump room,
centrifical room, BOP deck & cellar
area. Circulate & flush corrosion
inhibitor through CPU. Continue off
loading all fluids.
0.0 0.0
5/12/2022
00:00
5/12/2022
06:00
6.00 MIRU, MOVE OTHR P Continue cleaning pump room,
centrifical room, BOP deck & cellar
area. Remove shaker screens & clean
shakers. Continue off loading all fluids.
0.0 0.0
5/12/2022
06:00
5/12/2022
12:00
6.00 MIRU, MOVE OTHR P Clean pump room, pit room / equipment,
& pipe shed. Begin washing exterior or
the rig.
0.0 0.0
5/12/2022
12:00
5/12/2022
18:00
6.00 MIRU, MOVE OTHR P Continue cleaning pit area & pipe shed.
Wash the exterior of the rig. Build
containment area in the court yard for
washing subs & handling equipment.
0.0 0.0
5/12/2022
18:00
5/13/2022
00:00
6.00 MIRU, MOVE OTHR P Clean pipe shed & pump room. Remove
floor covers in the pits and pressure
wash below.
0.0 0.0
12/10/2022
12:00
12/10/2022
12:30
0.50 SURFAC, DRILL BHAH P M/U BHA AS PER SLB REP 120.0 120.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 4/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/10/2022
12:30
12/10/2022
13:00
0.50 SURFAC, DRILL DDRL P DRILL 24” SURFACE HOLE F/120'
T/217‘ GPM= 600 F/O= 35%, WOB= 5K
PSI ON= 950 RPM=30
120.0 217.0
12/10/2022
13:00
12/10/2022
13:15
0.25 SURFAC, DRILL TRIP P POOH F/217' T/124 217.0 124.0
12/10/2022
13:15
12/10/2022
13:45
0.50 SURFAC, DRILL BHAH P M/U BHA AS PER SLB REP 124.0 124.0
12/10/2022
13:45
12/10/2022
14:00
0.25 SURFAC, DRILL CIRC P WASH F/124' T/217' SHOOT SURVEY
FOR GYRO @ 185'
124.0 217.0
12/10/2022
14:00
12/10/2022
18:00
4.00 SURFAC, DRILL DDRL P CONT DRILLING 24” SURFACE HOLE
F/217' T/420‘ RWT= 113K GPM= 790
F/O= 40%, WOB=
12K PSI ON=1300 PSI OFF=1100 TQ.
ON= 11K TQ. OFF=4 K RPM=40
ECD=10.92
217.0 420.0
12/10/2022
18:00
12/10/2022
21:30
3.50 SURFAC, DRILL DDRL P CONT DRILLING 24” SURFACE HOLE
F/420' T/ 610‘ RWT= K GPM=808
F/O=41%, WOB= 10K
PSI ON=1236 PSI OFF= 1107 TQ. ON=
8K TQ. OFF=3K RPM=40 ECD=10.62
420.0 610.0
12/10/2022
21:30
12/10/2022
22:30
1.00 SURFAC, DRILL BHAH P RACK BACK STD 5, P/U 8'' HYDRA-
JAR AND SPLIT FLEX COLLAR AS
PER SLB DD REP, M/U
STD #5
610.0 610.0
12/10/2022
22:30
12/11/2022
00:00
1.50 SURFAC, DRILL DDRL P CONT DRILLING 24” SURFACE HOLE
F/610 ' T/657‘ RWT=130K, GPM=795,
F/O= 40%,
WOB=11K, PSI ON=1524, PSI
OFF=1275, TQ. ON=6 K, TQ. OFF=3 K,
RPM=40, ECD=10.40,
ADT=5.36, TST=2.23, TRT=3.13,
PUW=139K, SOW= 127K
610.0 657.0
12/11/2022
00:00
12/11/2022
06:00
6.00 SURFAC, DRILL DDRL P CONT DRILLING 24” SURFACE HOLE
F/657 TO 866 ‘ RWT=130K, GPM=795,
F/O= 40%, WOB=11K, PSI ON=1524,
PSI OFF=1275, TQ. ON=6 K, TQ.
OFF=3 K, RPM=40, ECD=10.40,
PUW=139K, SOW= 127K
657.0 866.0
12/11/2022
06:00
12/11/2022
11:30
5.50 SURFAC, DRILL DDRL P CONT DRILLING 24” SURFACE HOLE
F/866' T/1,438', TVD=1,369' PUW=164K
SOW=167K
RWT=160K GPM=1000 F/O= 42%,
WOB= 10-30K PSI ON= 2175, PSI
OFF= 1925, TQ. ON=8-15 K
TQ. OFF= 2-4K RPM= 40 ECD= 10.65
MAX GAS OBSERVED= 0 UNITS
TOUR BIT HR=2.68, TOTAL BIT
HR=11.2, TOTAL JAR HR=11.2,TOUR
SLIDE HR=1.22,
TOTAL SLIDE HR=5.7
866.0 1,438.0
12/11/2022
11:30
12/11/2022
12:00
0.50 SURFAC, DRILL SVRG P 30 MIN RIG SERVICE 1,438.0 1,438.0
12/11/2022
12:00
12/11/2022
18:00
6.00 SURFAC, DRILL DDRL P CONT DRILLING 24” SURFACE HOLE
F/1,438' T/2,170', TVD=2,124',
PUW=142K SOW=178K
RWT=170K GPM=1100 F/O= 46%,
WOB=30K PSI ON=2922 PSI OFF=
2400 TQ. ON=17K TQ.
OFF=4K RPM=40 ECD=10.95 MAX
GAS OBSERVED= 0 UNITS TOUR BIT
HR=3.03, TOTAL BIT
HR=15.4, TOTAL JAR HR=15.4,TOUR
SLIDE HR=1.17, TOTAL SLIDE
HR=6.87
1,438.0 2,170.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 5/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/11/2022
18:00
12/11/2022
22:30
4.50 SURFAC, DRILL DDRL P CONT DRILLING 24” SURFACE HOLE
F/2,170 ' T/2,373, PUW=180K
SOW=192K RWT=187K
GPM=1100 F/O=42% WOB=27K PSI
ON=2616 PSI OFF=2331 TQ ON=15K
TQ OFF=7K RPM=40
ECD=10.62 MAX GAS OBSERVED=0
UNITS
2,170.0 2,373.0
12/11/2022
22:30
12/11/2022
23:00
0.50 SURFAC, DRILL CIRC P INCREASE IN PUMP PRESSURE 300-
500PSI OVER, DECREASE PUMP
RATE TO 950GPM,
2980PSI P/U OFF BOTTOM, HOLE
UNLOADING, CIRC. RECIPROCATE
40RPM TILL PUMP
PRESSURE STABILIZE AND
SHAKERS CLEANED UP RECIP. PIPE
AND ROTATING DURING THIS TIME
2,373.0 2,373.0
12/11/2022
23:00
12/12/2022
00:00
1.00 SURFAC, DRILL DDRL P CONT DRILLING 24” SURFACE HOLE
F/2,373 ' T/2,429 ‘ TVD=2,368
PUW=180K SOW=192K
RWT=187K GPM=950 F/O=36%,
WOB=30K PSI ON=2820 PSI
OFF=2460 TQ. ON=11K TQ OFF=7K
RPM=40 ECD=10.52 MAX GAS
OBSERVED=0 UNITS TOUR BIT
HR=3.97 TOTAL BIT HR=19.37
TOTAL JAR HR= 19.37 ADT=2.3
TST=1.67 TOTAL SLIDE=8.54 TOTAL
DRILL TIME=10.83
2,373.0 2,429.0
12/12/2022
00:00
12/12/2022
02:00
2.00 SURFAC, DRILL DDRL P CONT DRILLING 24” SURFACE HOLE
F/2,429'TO 2483' TVD=2,416'
PUW=180K SOW=192K RWT=187K
GPM=950 F/O=36%, WOB=30K PSI
ON=2820 PSI OFF=2460 TQ. ON=11K
TQ OFF=7K RPM=40 ECD=10.52
MAX GAS OBSERVED=0 UNITS
TOUR BIT HR=3.97 TOTAL BIT
HR=20.71 TOTAL JAR HR= 20.71
ADT=.1.34 TST=0 TOTAL
SLIDE=8.54TOTAL DRILL TIME=20.71
2,429.0 2,483.0
12/12/2022
02:00
12/12/2022
02:30
0.50 SURFAC, TRIPCAS BKRM P BROOH F/ 2483 TO 2464' RPM 60 1.5
FPM 950 GPM 2910 PSI P/U 188 S/O
179 RWT 180 LAY DOWN SINGLE IN
SHED
2,483.0 2,464.0
12/12/2022
02:30
12/12/2022
05:15
2.75 SURFAC, TRIPCAS BKRM P BROOH F/ 2464' TO 2250' RPM 60 1.5
FPM 950 GPM 2910 PSI P/U 188 S/O
179 RWT 180 AFTER FULL BOTTOMS
UP RACK STAND BACK
2,464.0 2,250.0
12/12/2022
05:15
12/12/2022
05:30
0.25 SURFAC, TRIPCAS OWFF P 15 MIN FLOW CHECK AS PER CO
MAN
2,250.0 2,250.0
12/12/2022
05:30
12/12/2022
09:00
3.50 SURFAC, TRIPCAS BKRM P BROOH F/2,250’ T/1,440’, ROT 154K,
GPM= 1150, PSI= 2360, TQ= 2-5K,
RPM= 50, F/O= 40%
2,250.0 1,440.0
12/12/2022
09:00
12/12/2022
09:30
0.50 SURFAC, TRIPCAS CIRC P CIRC/RECIP F/1,440' T/1,345',
GPM=1150, PSI=2341, RPM=50, TQ=
2K, F/O= 40%, 6000 TOTAL
STKS PUMPED
1,400.0 1,345.0
12/12/2022
09:30
12/12/2022
12:00
2.50 SURFAC, TRIPCAS PMPO P PUMP OUT OF HOLE @ 800 GPM,
1120 PSI, 42% F.O, F/1,345' T/662',
PUW=141K, LAY DOWN
ACCELERATOR AS PER DD
1,345.0 662.0
12/12/2022
12:00
12/12/2022
14:00
2.00 SURFAC, TRIPCAS PMPO P PUMP OUT OF HOLE @ 800 GPM, 970
PSI, 42% F.O, F/662' T/162',
PUW=105K
662.0 162.0
12/12/2022
14:00
12/12/2022
18:00
4.00 SURFAC, TRIPCAS BHAH P LAY DOWN BHA AS PER DD, F/162'
T/0
162.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 6/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/12/2022
18:00
12/12/2022
20:00
2.00 SURFAC, TRIPCAS BHAH P CLEAN AND CLEAR RIG FLOOR,
PREP TO PULL WEAR RING
0.0 0.0
12/12/2022
20:00
12/12/2022
22:00
2.00 SURFAC, CASING WWWH P P/U 2 JTS 5'' DP AND WEAR RING
PULLING TOOL, ATTEMPT TO PULL
WEAR RING AS PER
CAMERON REP, L/D 5'' DP AND
PULLING TOOL
0.0 0.0
12/12/2022
22:00
12/12/2022
23:00
1.00 SURFAC, CASING WWWH T P/U STD OF 6-5/8 DP OUT OF
DERRICK MAKE UP JOHNNY WAKER,
JET THE WEAR RING
PROFILE 480GPM, 5RPM,
RECIPROCATING 3FPM BETWEEN 45
-60FT, RACK BACK STD IN
DERRICK, B/D TOP DRIVE, SUCK
OUT RISER,
0.0 0.0
12/12/2022
23:00
12/13/2022
00:00
1.00 SURFAC, CASING WWWH T P/U 2 JTS 5'' DP, P/U CAMERON
WEAR RING RUNNING TOOL
0.0 0.0
12/13/2022
00:00
12/13/2022
01:30
1.50 SURFAC, CASING WWWH T CONT. P/U 2 JTS 5'' DP, P/U
CAMERON WEAR RING RUNNING
TOOL PULL WEAR RING AS PER COP
AND CAMERON REP, L/D HANDLING
TOOLS CLEAR RIG FLOOR
0.0 0.0
12/13/2022
01:30
12/13/2022
06:00
4.50 SURFAC, CASING RURD P PJSM PREP RIG FLOOR TO RUN 20"
CASING, M/U VOLANT TOOLS AS
PER DOYON CASING CREW,
TORQUW THROUGH VOLANT TOOL
VERIFY TORQUE IS GOOD. P/U 500
TON SPIDERS AND 6' PONY BAILES,
20" ELEVATORS AND BACK UP
STRAP TONGS.
0.0 0.0
12/13/2022
06:00
12/13/2022
07:00
1.00 SURFAC, CASING RURD P CON'T PREPPING RIG FLOOR FOR
CASING RUN, FILL RISER
0.0 0.0
12/13/2022
07:00
12/13/2022
09:15
2.25 SURFAC, CASING PUTB P RIH W/ 20" #133 L-80 T-ER CASING,
TORQUE TO 31K, F/0', T/240' INSTALL
CENTRALIZERS
ON EVERY JT, BAKER LOK SHOE
TRACK & FLOAT COLLAR ASSEMBLY,
FILL EACH JT TOP
OFF EVERY 5TH, SOW=112K
0.0 240.0
12/13/2022
09:15
12/13/2022
10:45
1.50 SURFAC, CASING RGRP T TROUBLE SHOOT PIPE SKATE
REPLACE CONTROL AND CABLE ON
MAIN BOX
240.0 240.0
12/13/2022
10:45
12/13/2022
12:00
1.25 SURFAC, CASING PUTB P RIH W/ 20" #133 L-80 T-ER CASING,
TORQUE TO 31K, F/240', T/494'
INSTALL CENTRALIZERS
ON EVERY JT, BAKER LOK SHOE
TRACK & FLOAT COLLAR ASSEMBLY,
FILL EACH JT TOP
OFF EVERY 5TH, SOW=133K, PUMP
DOWN AS NEEDED @ 400 GPM, 124
PSI, 19% F/O
240.0 494.0
12/13/2022
12:00
12/13/2022
18:00
6.00 SURFAC, CASING PUTB P RIH W/ 20" #133 L-80 T-ER CASING,
TORQUE TO 31K, F/494', T/1500'
INSTALL CENTRALIZERS
ON EVERY JT, BAKER LOK SHOE
TRACK & FLOAT COLLAR ASSEMBLY,
FILL EACH JT TOP
OFF EVERY 5TH, SOW=215K, PUW=
230K PUMP DOWN AS NEEDED @
400 GPM, 140 PSI, 19%
F/O
494.0 1,500.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 7/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/13/2022
18:00
12/14/2022
00:00
6.00 SURFAC, CASING PUTB P RIH W/ 20" #133 L-80 T-ER CASING,
TORQUE TO 31K, F/1500', T/'2416
INSTALL
CENTRALIZERS ON EVERY JT, FILL
EACH JT TOP OFF EVERY 5TH,
SOW=286K, PUW=346K
PUMP DOWN AS NEEDED @ 400
GPM, 120 PSI, 15% F/O
1,500.0 2,416.0
12/14/2022
00:00
12/14/2022
02:30
2.50 SURFAC, CASING PUTB P RIH W/ 20" #133 L-80 T-ER CASING,
TORQUE TO 31K, F/2416', T/'2478
LAND OUT 20" CASING, INSTALL
CENTRALIZERS ON EVERY JT, FILL
EACH JT TOP OFF EVERY 5TH,
SOW=286K, PUW=346K PUMP
DOWN AS NEEDED @ 400 GPM, 120
PSI, 15% F/O
2,416.0 2,478.0
12/14/2022
02:30
12/14/2022
04:30
2.00 SURFAC, CEMENT CIRC P CIRCULATE 2X B/U GPM 420 PSI 141
F/O 17 % OWFF 15 MIN WELL STATIC
2,478.0 2,478.0
12/14/2022
04:30
12/14/2022
08:30
4.00 SURFAC, CEMENT PUTB P BACK OUT LANDING JOINT FROM
HANGER, P/U LAY DOWN TOP
LANDING JT, BREAK CONNECTION
AND LAYDOWN VOLANT TOOL
2,478.0 2,478.0
12/14/2022
08:30
12/14/2022
09:30
1.00 SURFAC, CEMENT RURD P RIGGING DOWN DOYON 20" CASING
TOOLS. CLEAN & CLEAR RIG
FLOOR. PREP FOR RIH W/ CEMENT
STING IN TOOL ON 6 5/8" HWDP & DP.
2,478.0 2,478.0
12/14/2022
09:30
12/14/2022
14:00
4.50 SURFAC, CEMENT TRIP P RIH W/ CEMENT STING IN TOOL F/
SURFACE TO 2356'. SOW=154K
2,478.0 2,478.0
12/14/2022
14:00
12/14/2022
14:45
0.75 SURFAC, CEMENT RURD P P/U & INSTALL CITADEL CEMENT
HEAD WITH MANIFOLD FOR
CHECKING FLOATS.
2,478.0 2,478.0
12/14/2022
14:45
12/14/2022
15:00
0.25 SURFAC, CEMENT TRIP P RIH R/ 2356' TO 2388'. SOW=164K,
STING INTO STAB IN FLOAT COLLAR
& SET DOWN 53K WT.
2,478.0 2,478.0
12/14/2022
15:00
12/14/2022
16:00
1.00 SURFAC, CEMENT RURD P M/U CEMENT MANIFOLD, LINE UP
MANIFOLD PREPARING TO
CIRCULATE.
2,478.0 2,478.0
12/14/2022
16:00
12/14/2022
18:00
2.00 SURFAC, CEMENT CIRC P BREAK CIRCULATION @ 2 BPM,
VERIFY FLOW PATH AND ENSURE
DEBRIS CUP IS IN PLACE. STAGE
PUMPS UP TO 12 BPM, PSI=490,
F/O=28%, CONTINUE CLEARING
CASING EQUIPMENT FROM RIG
FLOOR. RIG UP INJECTION LINE TO
4" VALVE IN CELLAR BOX FOR
BLACK WATER FLUSH/CEMENT
CLEAN UP.
2,478.0 2,478.0
12/14/2022
18:00
12/14/2022
22:00
4.00 SURFAC, CEMENT CIRC P PJSM FOR PUMPING CEMENT. SLB
CEMENTER PUMP 5 BBL F/W.
PRESSURE TEST CEMENT SYSTEM
3500 PSI. RIG PUMP 150 BBLS OF
10.0 PPG MUDPUSH II @ 10 BPM W/
RED DYE WITH 220 PSI. SLB
CEMENTER PUMP 650 BBLS OF 11.0
PPG AT 11.0 BPM W/ 1250 PSI. PUMP
155 BBLS OF 15.8 PPG CLASS G TAIL
CMT AT 4-8 BPM W/ 800 PSI. CHASE
WITH 5 BBLS FW, DROP TOP LATCH
DART, CHASE WITH 15 BBLS F/W.
NO LOSSES DURING CEMENT JOB,
FULL CEMENT RETURNS TO
SURFACE.
2,478.0 2,478.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 8/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/14/2022
22:00
12/14/2022
23:00
1.00 SURFAC, CEMENT DISP P RIG PUMPS DISPLACE 68 BBLS OF
10.0 PPG DRIL PLEX MUD AT 420
GPM W/ 560 PSI. LATCH DART AND
PRESSURE UP TO 1420 PSI, BLEED
OFF, & CHECK FLOATS. FLOATS
HOLDING.
2,478.0 2,478.0
12/14/2022
23:00
12/15/2022
00:00
1.00 SURFAC, CEMENT CIRC P PICK UP AND STING OUT OF STAB IN
FC AT 2388' W/ 195K P/U WT. POOH
TO 2355' PUW=180K. EST
CIRCULATION, RELEASE 1ST FOAM
BALL, CHASE WITH 30 BBLS F/W.
CIRCULATE ONE DP VOLUME.
RELEASE 2ND FOAM BALL &
CIRCULATE SURFACE TO SURFACE
AT 494 GPM W/ 350 PSI.
2,478.0 2,478.0
12/15/2022
00:00
12/15/2022
01:30
1.50 SURFAC, CEMENT CIRC P CONT. RELEASE 2ND FOAM BALL &
CIRCULATE SURFACE TO SURFACE
AT 494 GPM W/ 350 PSI.
2,478.0 2,478.0
12/15/2022
01:30
12/15/2022
02:00
0.50 SURFAC, CEMENT OWFF P FLOW CHECK WELL 30 MIN WELL
STATIC
2,478.0 2,478.0
12/15/2022
02:00
12/15/2022
05:00
3.00 SURFAC, CEMENT RURD P L/D DOWN CEMENT HEAD AS PER
CITADEL REP FLUSH CLEAN
CEMENT LINES AND VAC TRUCKS
AND MAGTEC EQUIP. SPOTTED 30
BBLS OF BLACK WATER AT
WELLHEAD/CASING HANGER AREA.
2,478.0 2,478.0
12/15/2022
05:00
12/15/2022
07:30
2.50 SURFAC, CEMENT TRIP P POOH F/ 2343' TO 765', RACKING
BACK IN DERRICK. PUW = 155K,
HOLE FILL VIA PIT #5.
2,343.0 765.0
12/15/2022
07:30
12/15/2022
13:00
5.50 SURFAC, CEMENT CLEN T STOPPED POOH DUE TO ROTARY
DRIP PAN, FLOWLINE BEING
PACKED OFF. CLEANING ROTARY
DRIP PAN, FLOWLINE & BOP DECK.
CIRCULATE AT MAX RATE TO CLEAR
RISER AND FLOWLINE. BLOW
DOWN TOPDRIVE. PREPARE RIG
FLOOR TO CONTINUE POOH.
765.0 765.0
12/15/2022
13:00
12/15/2022
14:00
1.00 SURFAC, CEMENT TRIP P POOH F/ 765' TO SURFACE,
RACKING BACK IN DERRICK. L/D
LAST 9 JTS OF HWDP, MONITORING
HOLE FILL VIA PIT #5. SIMOPS:
CONTINUE CLEANING MUD PITS.
765.0 0.0
12/15/2022
14:00
12/15/2022
18:00
4.00 SURFAC, CEMENT CLEN T CLEANING CONTAMINATED MUD
FROM ROTARY DRIP PAN,
FLOWLINES, FLOW BOX IN PITS,
SHAKERS. OFFLOADING MUD FROM
PITS #1, #2, & #3. CLEANING
PLUGGED LINES IN CPU, JETTING
RISER WITH BLACK WATER AT MAX
RATE WITH ALL 4 MUD PUMPS.
FLUS THROUGH RACE TRACK AND
ALL SHAKER VALVES. FLUSH DUMP
LINES TO CPU. JET FLOWLINE,
BLOW DOWN JET AND HOLE FILL
LINE.
0.0 0.0
12/15/2022
18:00
12/15/2022
21:00
3.00 SURFAC, CEMENT CLEN P DRAIN RISER, SEND BLACK WATER
TO CPU. CIRCULATE BLACK WATER
IN CPU WITH BOTH PUMPS.
PREPARE TO PULL SURFACE RISER.
CONTINUE CLEANING &
OFFLOADING MUD PITS. PULL
UPPER SECTION OF RISER.
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 9/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/15/2022
21:00
12/16/2022
00:00
3.00 SURFAC, CEMENT NUND P NIPPLE DOWN SURFACE RISERS
FROM WELLHEAD. MOBILIZE
RISERS OUT OF THE BOP MOD.
SIMOPS: CONTINUE TO CLEAN MUD
PITS & CPU TANKS FROM
CONTAMINATED MUD. (NO CEMENT
FOUND IN ANY PITS OR TANKS).
CLEAN & INSPECT ALL 4 SURGE
TANKS ON MUD PUMPS.
0.0 0.0
12/16/2022
00:00
12/16/2022
02:00
2.00 SURFAC, CEMENT NUND P NIPPLE DOWN SURFACE RISERS
FROM WELLHEAD. MOBILIZE
RISERS OUT OF THE BOP MOD.
SIMOPS: CONTINUE TO CLEAN MUD
PITS & CPU TANKS FROM
CONTAMINATED MUD. (NO CEMENT
FOUND IN ANY PITS OR TANKS).
CLEAN & INSPECT ALL 4 SURGE
TANKS ON MUD PUMPS.
0.0 0.0
12/16/2022
02:00
12/16/2022
04:00
2.00 SURFAC, CEMENT NUND P N/D & REMOVE THE LOW PRESSURE
ADAPTER SPOOL ASSY F/
WELLHEAD.
0.0 0.0
12/16/2022
04:00
12/16/2022
07:30
3.50 SURFAC, CEMENT WWWH P WASH DEBRIS AND CLEAN GRAVEL
FROM CASING HANGER PROFILE IN
WELLHEAD. CAMERON TECH
INSPECT SAME & PREPARE TO
INSTALL & TEST PRIMARY PACKOFF
SUPPORT BUSHING.
0.0 0.0
12/16/2022
07:30
12/16/2022
12:00
4.50 SURFAC, WHDBOP WWSP P ATTEMPTING TO INSTALL CAMERON
PACKOFF BUSHING IN WELLHEAD.
UNABLE TO INSTALL DUE TO
ALIGNMENT/CLEARANCE ISSUES.
SIMOPS: WORKING TO CLEAR PLUG
F/ CPU/MAGTEC LINE, CLEANING
EQUIP IN PITS, REPAIRING ST-120
HYD LEAK.
0.0 0.0
12/16/2022
12:00
12/16/2022
15:00
3.00 SURFAC, WHDBOP WWSP T UNABLE TO INSTALL CAMERON
PACKOFF BUSHING. CONSULTING
WITH ENGINEERING TEAM TO
RESOLVE ISSUES AND DEVELOP
PLAN FORWARD. CONTINUE WITH
RIG MAINTENANCE & SIMOPS
CLEARING CPU/MAGTEC LINE.
0.0 0.0
12/16/2022
15:00
12/16/2022
19:30
4.50 SURFAC, WHDBOP WWSP T CONTINUE TO TROUBLESHOOT AND
INSTALL CAMERON PACKOFF
BUSHING IN WELLHEAD HOUSING.
LOOSEN CONDUCTOR HOUSING
STUDS & ATTEMPT TO CENTER
WITH A HYD JACK. ATTEMPT TO
ADJUST CLEARANCES IN WH,
REMOVE O-RING SEALS ON
BUSHING AND ATTEMPT TO INSTALL
SAME. NO GOOD.
0.0 0.0
12/16/2022
19:30
12/17/2022
00:00
4.50 SURFAC, WHDBOP WWSP T DISCONTINUE CAMERON PACKOFF
BUSHING INSTALLATION ATTEMPTS.
ALLOW CAMERON REP TO REST
DUE TO HOURS. ENGINEERING
TEAM DEVELOPING A PLAN
FORWARD. SIMOPS: RIG
MAINTENANCE: INSULATING
CPU/MAGTEC LINES, CLEANING
PITS/RIG FLOOR, FUNCTION TEST
BOP TEST PUMP, INSTALL BALL
VALVE ON ANNULAR CONTROL LINE,
PREPARING CROSSOVERS FOR BOP
TESTING, LOAD BOP TEST MANDREL
INTO PIPE SHED.
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 10/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/17/2022
00:00
12/17/2022
06:00
6.00 SURFAC, WHDBOP WWSP T DISCONTINUE CAMERON PACKOFF
BUSHING INSTALLATION ATTEMPTS.
ALLOW CAMERON REP TO REST
DUE TO HOURS. ENGINEERING
TEAM DEVELOPING A PLAN
FORWARD. SIMOPS: RIG
MAINTENANCE: INSULATING
CPU/MAGTEC LINES, CLEANING
PITS/RIG FLOOR, FUNCTION TEST
BOP TEST PUMP, INSTALL BALL
VALVE ON ANNULAR CONTROL LINE,
PREPARING CROSSOVERS FOR BOP
TESTING, LOAD BOP TEST MANDREL
INTO PIPE SHED.
0.0 0.0
12/17/2022
06:00
12/17/2022
12:00
6.00 SURFAC, WHDBOP WWSP T UNABLE TO INSTALL CAMERON
PACKOFF BUSHING IN WH.
ENGINEERING TEAM WORKING
WITH CAMERON TO DEVELOP
OPERATING PROCEDURE FOR PLAN
FORWARD. HELD OPERATIONAL
MEETING WITH OFFICE TEAM.
SIMOPS: PERFORM WEEKLY DRK
INSPECTION. CIRC PITS #1 & #2
OVER SHAKERS. TRANSFER PIT #1
TO PIT #3. TOP RINSE #1 PIT TO
SUPER SUCKER, OPEN, CLEAN &
INSPECT HAMMER MILL IN CPU.
REWIRE HEAT TRACE ON #2 LINE
FROM CPU TO MAGTEC.
0.0 0.0
12/17/2022
12:00
12/17/2022
14:00
2.00 SURFAC, WHDBOP WWSP T CONTINUE WAITING ON PLAN
FORWARD FROM CAMERON ON
OPERATING PROCEDURES FOR WH.
SIMOPS: CONTINUE WORKING ON
DERRICK INSPECTION. CHANGING
OUT HAMMER MILL WEAR PLATES.
RECIEVED MOC AND REVISED
PROCEDURES FROM CAMERON AT
13:08 HRS.
0.0 0.0
12/17/2022
14:00
12/17/2022
17:00
3.00 SURFAC, WHDBOP PRTS P HOLD PJSM. TIGHTEN CONDUCTOR
HOUSING SLIP STUDS. INSTALL
HIGH PRESSURE ADAPTER ON
CONDUCTOR HOUSING. SET DOWN
BOP & SECURE ON TEST STAND.
PRESSURE TEST T-SEALS TO 2800
PSI & LOWER SEALS TO 1300 PSI,
WITNESSED BY CPAI REP. RIG UP
TO PULL TEST ADAPTER FLANGE TO
10K OVERPULL. CAMERON REP
CONSULTING WITH OFFICE
ENGINEERING TEAM TO CONFIRM
TEST PRESSURES & PROCEDURES.
0.0 0.0
12/17/2022
17:00
12/17/2022
19:30
2.50 SURFAC, WHDBOP PRTS P PULL TEST ADAPTER FLANGE TO
10K OVERPULL AS PER CAMERON
SOP. PRESSURE TEST T-SEALS TO
3000 PSI & LOWER SEALS TO 1300
PSI, WITNESSED BY CPAI REP.
0.0 0.0
12/17/2022
19:30
12/18/2022
00:00
4.50 SURFAC, WHDBOP NUND P HOLD PJSM & N/U 18 3/4" 5M BOPE &
RISER TO CAMERON HP ADAPTER.
INSPECT FLANGE GAP. TORQUE
LOCK DOWNS AS PER SOP TO 650
FT/LBS. CENTER & SECURE BOP
STACK. INSTALL TRIP NIPPLE,
CHECK AIR BOOTS. LOAD 45 JTS OF
17" 88.1# HYDRIL CASING INTO PIPE
SHED. CLEAN & INSPECT
CENTRIFUGE #2. C/O ALLEN HEAD
BOLTS ON HAMMER MILL WEAR
PLATES.
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 11/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/18/2022
00:00
12/18/2022
06:00
6.00 SURFAC, WHDBOP NUND P HOLD PJSM, N/U MPD ORBIT VALVE,
6" HOSE TO MPD SKID, 2" HIGH
PRESSURE HOSES AND HARD IRON.
CONT INSTALLING ANNULUS VALVE,
1502 FITTINGS FOR DIGITAL
READINGS AND 150 PSI PRV ON
WELLHEAD. LOCKDOWNS ON HIGH
PRESSURE RISER AS PER
CAMERON. SIMOPS: FINISH
CLEANING CENTRIFUGE DUMP LINE,
CONT REPLACING BOLTS ON
HAMMER MILL, AND BLOW OUT ALL
GRAVEL FROM GUN LINE MANIFOLD
AND JETS IN MUD PITS. RECORD
RKB MEASUREMENTS ON BOP
COMPONENTS, BUILD 4.5" TEST JT
FOR SETTING TEST PLUG.
RKB-ANNULAR--19.53'
RKB-TOP VBR RAMS-23.90'
RKB-BLIND/SHEAR RAMS-25.15'
RKB-MUD CROSS-27.58'
RKB-BOTTOM VBR RAMS-30.35'
RKB-LDS-------------------48.55'
RKB-GL---------------------54.35'
0.0 0.0
12/18/2022
06:00
12/18/2022
09:00
3.00 SURFAC, WHDBOP OTHR P RIG UP ANNULUS TO CELLAR BOX.
REPOSITION BOP CENTERING
LINES. SIMOPS: PUMPING MUD
OVER SHAKERS, THAW TRIP TANK
SUCTION LINES, FUNCTION
TESTING ALARMS: CELLAR ALARM,
GAS ALARM & PVT ALARMS. RIG UP
CELLAR PUMP.
0.0 0.0
12/18/2022
09:00
12/18/2022
12:00
3.00 SURFAC, WHDBOP RURD P MAKE UP CROSSOVERS ON TEST
PLUG & RIH W/ 2 STDS OF 6 5/8"
HWDP BENEATH TEST PLUG.
INSTALL TEST TORPEDO ON TOP
DRIVE. M/U 4.5" TEST MANDREL TO
TEST PLUG & RIH TO LAND OUT IN
WH.
0.0 0.0
12/18/2022
12:00
12/18/2022
14:00
2.00 SURFAC, WHDBOP RURD P WHILE SETTING TEST PLUG,
OBSERVED RETURNS FROM
ANNULUS STOPPED. OBSERVED
ANNULUS VALVE PLUGGED WITH
MUD/GRAVEL. SET TEST PLUG AND
STARTED FILLING BOPS, OBSERVED
TEST PLUG SEALS LEAKING. PULL
TEST PLUG BACK TO FLOOR &
CLEANED GRAVEL FROM TEST PLUG
SEAL PROFILE. C/O SEAL. TOP
RINSED GRAVEL/DEBRIS OUT OF
THE HIGH PSI ADAPTER PROFILE.
0.0 0.0
12/18/2022
14:00
12/18/2022
16:45
2.75 SURFAC, WHDBOP BOPE P RIH W/ TEST PLUG ON 4.5" MANDREL
& SET. CONFIRMED GOOD SEAL ON
TEST PLUG, NO LEAKAGE TO
ANNULUS VALVE. CLOSE ANNULAR
PREVENTER TO CENTER MANDREL,
PERFORM BREAK IN FUNCTION ON
THE NEW UPPER & LOWER VBRs ON
THE 4.5" TEST MANDREL AS PER
NOV PROCEDURE. L/D 4.5" TEST
MANDREL. SIMOPS: EMPTY MUD
PITS TO VAC TRUCK AND CLEAN
PITS #1,3, & 4.
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 12/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/18/2022
16:45
12/18/2022
20:00
3.25 SURFAC, WHDBOP BOPE P P/U 7 5/8" TEST MANDREL & PUP
JTS. RIH & M/U TO TEST PLUG.
CLOSE ANNULAR PREVENTER TO
CENTER IN WELL & PROCEED WITH
UPPER 4.5" X 7 5/8" & LOWER 3.5" X 6
5/8" VBRs BREAK IN PROCEDURE.
SIMOPS: EMPTY MUD PITS INTO
VAC TRUCK AND CONTINUE
CLEANING PITS #1,3, & 4.
0.0 0.0
12/18/2022
20:00
12/18/2022
21:30
1.50 SURFAC, WHDBOP BOPE P HOLD PJSM, P/U & M/U 6 5/8" TEST
JT, SPACE OUT PUP JTS. R/U HIGH
PSI TEST EQUIPMENT & CONDUCT
SHELL TEST.
0.0 0.0
12/18/2022
21:30
12/19/2022
00:00
2.50 SURFAC, WHDBOP BOPE P TEST 18 3/4" 5M BOPE'S W/ 6 5/8"
TEST JT. ALL TESTS TO 250/5000 PSI
5/10 MIN, TEST ANNULAR
PREVENTER TO 250/3500 PSI 5/10
MIN. TEST CM VALVES 1-16, HCR
CHOKE/KILL, MANUAL VALVES
CHOKE/KILL #3,, UPPER 4.5" x 7 5/8"
VBRS (W/ 3000 PSI MANIFOLD PSI) &
LOWER 3.5" x 6 5/8" VBRS. AOGCC
REP - BOB NOBLE ON LOCATION TO
WITNESS TESTING & THE FUNCTION
TESTING OF PVT, G/L, FLOWSHOW
ALARMS, TEST LEL & H2S ALARMS.
0.0 0.0
12/19/2022
00:00
12/19/2022
06:30
6.50 SURFAC, WHDBOP BOPE P Test 18.75" 5M BOPE at 250/5000 psi
for 5/10 min. Test annular preventer at
250/3500 psi for 5/10 min. W/ 6 5/8"
test mandrel. Test choke manifold
valves 1-16 at 250/5000 for 5/10 min.
Test manual operated & superchoke,
choke/kill manual valves & HCR valves,
dart valve, FOSV, Topdrive upper/lower
IBOP, upper & lower VBR's, blind/shear
rams. Perform accumulator system
drawdown test: Acc psi-2950, Manifold
psi-1650, Accumulator psi after all
functions on bottles-1750 psi. Time
lapse to build 200 psi with 1 electric
pump-25 seconds. 117 seconds to build
full system pressure with 2 electric
pumps & 6 air pumps. Closing times for
Annular-22 sec, UPR-17 sec, LPR-16
sec, Choke/Kill HCR-2 sec each.
Average of 4000 psi x 10 Nitrogen
bottles.
Conducted a retest on the upper VBRs
with 1500 psi manifold pressure to
250/5000 psi due to the first test we had
to apply 3000 psi on the accumulator
manifold pressure (opened bypass
valve) to achieve the test.
Function & test mud pit PVT, gain/loss
sensor, & flowline sensor alarms, test
LEL & H2S alarms. All tests witnessed
by AOGCC Rep--Bob Noble on 12-19-
2022.
0.0 0.0
12/19/2022
06:30
12/19/2022
08:45
2.25 SURFAC, WHDBOP BOPE P Reposition fall arrestors above the BOP
stack. Tighten flange between MPD
head and riser. Simops: Pull 6 5/8" test
joint, remove lower pup jt f/ test assy &
install crossover w/ MPD test plug on
test joint.
0.0 0.0
12/19/2022
08:45
12/19/2022
10:30
1.75 SURFAC, WHDBOP BOPE P Install MPD test plug into MPD head &
test at 250/1250 psi for 5/5 min. L/d
MPD test plug & xo sub. M/u pup jt &
acme xo to test joint.
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 13/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/19/2022
10:30
12/19/2022
12:45
2.25 SURFAC, WHDBOP BOPE P Rih with test joint. Make up to test plug,
Pull test plug to the rig floor. L/d test
plug & remove xo subs f/ the test joint.
0.0 0.0
12/19/2022
12:45
12/19/2022
13:30
0.75 SURFAC, WHDBOP RURD P Blow down top drive. R/u for 20" casing
test.
0.0 0.0
12/19/2022
13:30
12/19/2022
15:30
2.00 SURFAC, WHDBOP PRTS P Hold PJSM. Pump through kill line w/
#2 mud pump & take returns to Triptank
#2. Close Blind/shear rams. Test &
chart 20" 133# L-80 T-ER casing to
3000 psi. Pump @ .48 bpm for a total of
10.4 bbls. Close kill line HCR & monitor
casing pressure for 30 min. Bled off
10.4 bbls to trip tank. Good test.
0.0 0.0
12/19/2022
15:30
12/19/2022
18:00
2.50 SURFAC, WHDBOP BOPE P Drain BOPs, blow down mud pump #2,
choke & kill line. Trouble shoot cellar
pump, recalibrate drawworks, secure
block hangoff line. Simops: Test MPD
system @ 250/1250 psi.
0.0 0.0
12/19/2022
18:00
12/19/2022
20:15
2.25 SURFAC, DRILLOUT BHAH P Hold PJSM, and stage SLB bha #2
components to the rig floor via the
beaver slide. Simops: Function test
cellar alarm. R/u Totco monitor on OA.
Calibrate crown saver & floor saver
sensors on TDS.
0.0 0.0
12/19/2022
20:15
12/19/2022
23:45
3.50 SURFAC, DRILLOUT BHAH P Hold PJSM, and p/u 18 1/8"
Intermediate 1 cleanout bha #2 as per
SLB DD/MWD reps to 433'. P/U Wt =
107k, S/O Wt = 116k, monitoring
displacement via the triptank.
Sensor offset from bit:
MVC-26.41'
D+I-29.7'
APWD-49.89'
ARC res-52.22'
ARC gr-52.39'
0.0 433.0
12/19/2022
23:45
12/20/2022
00:00
0.25 SURFAC, DRILLOUT SFTY P Hold PJSM on picking up singles of 6
5/8" DP from pipe shed.
433.0 433.0
12/20/2022
00:00
12/20/2022
01:15
1.25 SURFAC, DRILLOUT CIRC P Tih w/ 18 1/8" cleanout bha, picking up
singles w/ 6 5/8" DP f/ 433' to 519',
drifting each jt with 5.125" drift. M/u
TDS and break circulation, staging mud
pump up to 607 gpm w/ 535 psi. Had
significant solids in returns over
shakers, initially. MWD tools came on
line at 600 gpm with an ECD of 14.0
ppg. Circulated 1400 stks (1200 stks
b/u) and ECD reduced to 10.01 ppg as
the annulus cleaned up. Blow down top
drive. P/u wt=107k, S/o wt-116k.
433.0 519.0
12/20/2022
01:15
12/20/2022
02:45
1.50 SURFAC, DRILLOUT PULD P Tih w/ 18 1/8" cleanout bha, picking up
singles of 6 5/8" DP f/ 519' to 1016',
drifting each jt with a 5.125" drift. M/u
TDS & break circulation, staging mud
pumps up to 635 gpm w/ 570 psi.
Returns over shakers were clean and
ECD of 9.8 ppg was recorded.
Circulated 900 stks total. P/U wt- 120k,
S/O wt- 124k. Blow down topdrive.
519.0 1,016.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 14/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/20/2022
02:45
12/20/2022
04:00
1.25 SURFAC, DRILLOUT PULD P Tih w/ 18 1/8" cleanout bha, picking up
singles of 6 5/8" DP f/ 1016' to 1513',
drifting each jt with a 5.125" drift. M/u
TDS & break circulation, staging mud
pumps up to 638 gpm w/ 600 psi.
Returns over shakers were clean and
ECD of 9.8 ppg was recorded.
Circulated 925 stks total. Mud wt
coming out of hole-9.8 ppg. P/U
wt=130k, S/O wt-134k, Monitoring
displacement to Triptank. Blow down
topdrive.
1,016.0 1,513.0
12/20/2022
04:00
12/20/2022
05:15
1.25 SURFAC, DRILLOUT PULD P Tih w/ 18 1/8" cleanout bha, picking up
singles of 6 5/8" DP f/ 1513' to 2203',
drifting each jt with a 5.125" drift. M/u
TDS & break circulation, staging pumps
up to 635 gpm.
1,513.0 2,203.0
12/20/2022
05:15
12/20/2022
07:15
2.00 SURFAC, DRILLOUT COCF P M/u topdrive & wash down f/ 2203' to
2383' w/ 50 rpm, 3-10k TQ, 600 gpms,
550 psi, 168k RTW, 30% flow. Tagged
the Innovex stab in FC at 2383' MD w/
3k WOB.
2,203.0 2,383.0
12/20/2022
07:15
12/20/2022
08:30
1.25 SURFAC, DRILLOUT DRLG P Drill out stab-in FC f/ 2383' to 2386' MD
w/ 50 rpms, 5-12k TQ, 67 spm, 450
gpm, 300 psi & 4-12k wob.
2,383.0 2,386.0
12/20/2022
08:30
12/20/2022
09:15
0.75 SURFAC, DRILLOUT COCF P Washing, rotating & reciprocating bit
through stab-in FC at 2383' to 2386' MD
3 times @ 50 rpm, 3-7k TQ, 67 spm,
450 gpm, 300 psi. Reciprocated one
time without rotation. No torque or drag
noted while passing through.
2,386.0 2,386.0
12/20/2022
09:15
12/20/2022
09:30
0.25 SURFAC, DRILLOUT COCF P Washing down with topdrive, f/ 2386' to
2426 MD w/ 50 rpm, 2-10k TQ, 600
gpm, 88 spm, 540 psi, 30% flow. 169k-
RTW.
2,386.0 2,426.0
12/20/2022
09:30
12/20/2022
10:15
0.75 SURFAC, DRILLOUT DRLG P Drill out DL FC f/ 2426' to 2428' MD @
50 rpm, 5-12k TQ, 450 gpm, 67 spm,
285 psi, 7-9k WOB, 25% flow, w/ 169k
RTW. (note: circulated up a small
quantity of thick mud from below FC)
2,426.0 2,428.0
12/20/2022
10:15
12/20/2022
12:15
2.00 SURFAC, DRILLOUT DRLG P Drilling cement in 20" casing f/ 2428' to
2470' MD @ 50 rpm, 6-13k TQ, 600
gpm, 88 spm, 590 psi, 16-19k WOB,
41% flow.
2,428.0 2,470.0
12/20/2022
12:15
12/20/2022
15:15
3.00 SURFAC, DRILLOUT CIRC P Circulating & condition mud while
rotating & reciiprocating at 2470' to
2448' in preparation for the FWP
displacement at 600 gpm w/ 590 psi &
50 rpm.
2,470.0 2,470.0
12/20/2022
15:15
12/20/2022
15:30
0.25 SURFAC, DRILLOUT OWFF P L/d single of 6 5/8" DP to skate. Blow
down topdrive. Install FOSV & monitor
well.
2,470.0 2,470.0
12/20/2022
15:30
12/20/2022
18:00
2.50 SURFAC, DRILLOUT CLEN P Cleaning mud pits & prepare for
displacement from 10.0 ppg Drilplex to
10.5 ppg FWP. Clean suction screens &
surge tanks on mud pumps #1 & #2.
Clean CPU tank. Simops: Monitor well
on trip tank #1.
2,470.0 2,470.0
12/20/2022
18:00
12/20/2022
19:00
1.00 SURFAC, DRILLOUT CLEN P Monitor well on trip tank #1 while
transferring 10.5 ppg FWP mut to pits
#4,5 & 6. Preparing for mud
displacement.
2,470.0 2,470.0
12/20/2022
19:00
12/20/2022
19:30
0.50 SURFAC, DRILLOUT SFTY P Hold PJSM with all personnel for
displacing f/ 10.0 ppg Drilplex to 10.5
ppg FWP mud. Walk the lines f/ rig to
tank farm and support trucks.
2,470.0 2,470.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 15/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/20/2022
19:30
12/20/2022
21:30
2.00 SURFAC, DRILLOUT CIRC P Displacing to 10.5 ppg FWP: pump 140
bbls of Hi-vis spacer f/ pit #7 at 400 gpm
w/ 150 psi. Follow spacer w/ new 10.5
ppg FWP mud at 800 gpm w/ 915 psi w/
20 rpm. Reciprocating 1'/min f/ 2444' to
2417', PUW-166k, SOW-158k, RTW-
166k, F/O-40%, ECD-10.72 ppg, 10.5
ppg FWP mud at shakers after pumping
6400 stks.
2,470.0 2,470.0
12/20/2022
21:30
12/20/2022
21:45
0.25 SURFAC, DRILLOUT WASH P Wash & ream f/ 2444' to 2470'. PUW-
165k, SOW-158k, rpm-50, TQ-3k, WOB-
2k, F/O-39%, GPM-608, PSI-590.
2,470.0 2,470.0
12/20/2022
21:45
12/20/2022
22:30
0.75 SURFAC, DRILLOUT DRLG P Drill cement in 20" casing f/ 2470' to
2472' w/ WOB-6k, rpm-50, ROP-4'/hr,
gpm-608, PSI-590. ECD-10.7 ppg
2,470.0 2,472.0
12/20/2022
22:30
12/21/2022
00:00
1.50 SURFAC, DRILLOUT DRLG P Drill Citadel 20" casing shoe f/ 2472.5' to
2473.5' at 613 gpm, w/ 533 psi. PUW-
166k, SOW-158k, RTW-166k, WOB-5-
8k, RPM-50. ECD-10.7 ppg.
OA=10 psi
2,472.5 2,473.5
12/21/2022
00:00
12/21/2022
02:00
2.00 SURFAC, DRILLOUT DRLG P Drilling Citadel 20" casing shoe f/ 2473'
to 2474'. WOB-5-8k, RPM-50, TQ-5-
9k, GPM-613, SPM-90, PUW-166k,
SOW-158k, RTW-166k, Noted
composite/fiber shoe material &
aluminum at shakers, good indication of
drilling the shoe.
2,473.5 2,474.0
12/21/2022
02:00
12/21/2022
04:00
2.00 SURFAC, DRILLOUT DRLG P Drilling Citadel 20" casing shoe f/ 2474'
to 2476'. Drilling torque decreased to
5k TQ at 2475'. Started changing
drilling parameters to improve ROP.
WOB-5-8k, RPM-50, TQ-5-9k, GPM-
613, SPM-90, PUW-166k, SOW-158k,
RTW-166k, Increased WOB to 18k,
GPM-700, Noted composite/fiber shoe
material & aluminum at shakers.
Worked drillstring up to 2465' w/
maximum gpm-1100 gpms. Worked
pipe back to bottom and noted an
improvement in TQ.
2,474.0 2,476.0
12/21/2022
04:00
12/21/2022
06:15
2.25 SURFAC, DRILLOUT DRLG P Drilling 24" rathole f/ 2476' to 2486'.
WOB-5-8k, RPM-50, TQ-5-9k, GPM-
613, SPM-90, PUW-166k, SOW-158k,
RTW-166k, Drift shoe while pumping @
GPM-606, PSI-505, 36% f/o. 3x w/
rotation @ 60 RPM, 1x w/o rotation.
2,476.0 2,486.0
12/21/2022
06:15
12/21/2022
07:00
0.75 SURFAC, DRILLOUT DDRL P Drill 20' of new formation f/ 2,486' MD
to 2,503' MD w/ WOB-5-13k, RPM-60,
TQ-5-6k, GPM-990, PSI-1,340, 46% f/o,
PUW-166k, SOW-158k, RTW-166k,
ART-.3, ADT-.3, total bit hrs - .3, jar hrs -
21.01
2,486.0 2,503.0
12/21/2022
07:00
12/21/2022
08:45
1.75 SURFAC, DRILLOUT CIRC P Rot and recip pipe f/ 2,503' MD to 2,454'
MD conditioning mud @ GPM-990, PSI-
1,340, 45% f/o, RPM-60, TQ-5-6k,PUW-
166k, SOW-165k, RTW-166k,
2,503.0 2,503.0
12/21/2022
08:45
12/21/2022
09:30
0.75 SURFAC, DRILLOUT CIRC P Downlink mwd as per slmb. 2,503.0 2,503.0
12/21/2022
09:30
12/21/2022
10:00
0.50 SURFAC, DRILLOUT OWFF P OWFF - static - Simops - L/D single and
B/D td
2,503.0 2,481.0
12/21/2022
10:00
12/21/2022
11:00
1.00 SURFAC, DRILLOUT RURD P R/U, flood lines, close upper pipe rams. 2,481.0 2,481.0
12/21/2022
11:00
12/21/2022
12:00
1.00 SURFAC, DRILLOUT FIT P Perform FIT w/ 3 spm and observe
break over at 362 psi at 30 stks.
2,481.0 2,481.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 16/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/21/2022
12:00
12/21/2022
13:15
1.25 SURFAC, DRILLOUT FIT P Close annular and perform FIT w/ 3
spm. Observe break over at 338 psi at
30 stks. Repeat test w/ 3 spm, Observe
break over at 339 psi at 30 stks. Bled
back 1.9 bbls to the trip tank.
2,481.0 2,481.0
12/21/2022
13:15
12/21/2022
14:00
0.75 SURFAC, DRILLOUT OWFF P OWFF - static. Simops - B/D and R/D
test equipment.
2,481.0 2,481.0
12/21/2022
14:00
12/21/2022
15:30
1.50 SURFAC, DRILLOUT SRVY P Circulate at 740 GPM, 907 PSI, 27%
F/O. Total stks pumped - 4290. Reduce
rate to 340 GPM, 185 psi, 16% F/O. -
Total Stks pumped - 1607 (943 bbls).
Obtain MWD data and consult with
town.
2,481.0 2,481.0
12/21/2022
15:30
12/21/2022
16:00
0.50 SURFAC, DRILLOUT RURD P B/D top drive and R/U to FIT. 2,481.0 2,481.0
12/21/2022
16:00
12/21/2022
16:45
0.75 SURFAC, DRILLOUT RURD P Close annular and FIT w/ 6 spm.
Observe break over at 485 psi at 21 stks
pumped. (EMW - 14.4 ppg). Bleed back
1 bbl to trip tank.
2,481.0 2,481.0
12/21/2022
16:45
12/21/2022
17:30
0.75 SURFAC, DRILLOUT WAIT P Consult with town on FIT results. -
Simops - Service rig equipment.
2,481.0 2,481.0
12/21/2022
17:30
12/21/2022
18:00
0.50 SURFAC, DRILLOUT RURD P B/D and R/D testing equipment. 2,481.0 2,481.0
12/21/2022
18:00
12/21/2022
19:00
1.00 SURFAC, DRILLOUT TRIP P P/U single and drift shoe f/ 2,481' MD to
2,490' MD. Observe no obstructions.
up wt - 165k, s/o wt - 164k. L/D single.
2,481.0 2,465.0
12/21/2022
19:00
12/21/2022
20:00
1.00 SURFAC, DRILLOUT CIRC P Recip pipe f/ 2,465' MD t/ 2,425' MD and
circ b/u w/ GPM-1000, PSI-1600, 45%
F/O, ECD-10.73, Total stks pumped -
4600 (736 bbls).
2,465.0 2,465.0
12/21/2022
20:00
12/21/2022
20:15
0.25 SURFAC, DRILLOUT OWFF P OWFF - static. 2,465.0 2,465.0
12/21/2022
20:15
12/21/2022
22:45
2.50 SURFAC, DRILLOUT TRIP P POOH on elevators f/ 2,465' MD t/ 532'
MD. Monitor disp via tt, up wt - 165k,
s/o wt - 161k.
2,465.0 532.0
12/21/2022
22:45
12/21/2022
23:00
0.25 SURFAC, DRILLOUT OWFF P OWFF - Static. simops - PJSM, L/D
BHA
532.0 532.0
12/21/2022
23:00
12/22/2022
00:00
1.00 SURFAC, DRILLOUT BHAH P Continue to pooh f/ 532' MD, l/d BHA
#2 as per slmb DD. Racked back 3 stds
hwdp t/ 77' MD.
532.0 77.0
12/22/2022
00:00
12/22/2022
01:00
1.00 SURFAC, DRILLOUT BHAH P Continue to L/D BHA #2 as per slmb
dd/mwd f/ 77' MD.
77.0 0.0
12/22/2022
01:00
12/22/2022
02:30
1.50 SURFAC, DRILLOUT BHAH P Clean and clear rig floor. Simops -
stage wear ring and wear ring running
tool to the rig floor.
0.0 0.0
12/22/2022
02:30
12/22/2022
03:00
0.50 SURFAC, DRILLOUT WWWH P P/U 2 jts of 6 5/8" dp out of the shed
and m/u stack washer as per cameron
rep. Flush profile w/ GPM-835, PSI-
123, F/O - 26%.
0.0 0.0
12/22/2022
03:00
12/22/2022
03:15
0.25 SURFAC, DRILLOUT RURD P B/D TD. L/D stack flushing tool. 0.0 0.0
12/22/2022
03:15
12/22/2022
04:00
0.75 INTRM1, DRILL RURD P M/U cameron running tool for wear ring
install. Install cameron HP Riser wear
bushing w/ 18 3/16" id as per cameron
rep. R/D cameron running tool.
0.0 0.0
12/22/2022
04:00
12/22/2022
04:30
0.50 INTRM1, DRILL SVRG P Service washpipe, Iron Roughneck, and
drawworks.
0.0 0.0
12/22/2022
04:30
12/22/2022
11:00
6.50 INTRM1, DRILL BHAH P P/U BHA #3 as per slmb dd to 602' MD. 0.0 602.0
12/22/2022
11:00
12/22/2022
12:30
1.50 INTRM1, DRILL TRIP P RIH W/ BHA #3 w/ 6 5/8" dp out of the
derrick f/ 602' MD to 1,521' MD. Monitor
disp via tt.
602.0 1,521.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 17/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/22/2022
12:30
12/22/2022
13:15
0.75 INTRM1, DRILL DHEQ P Fill pipe (26 bbls) @ 200 gpm, Shallow
hole test MWD w/ 140 spm, 945 gpm,
995 psi (good).
1,521.0 1,521.0
12/22/2022
13:15
12/22/2022
14:30
1.25 INTRM1, DRILL TRIP P Continue to rih w/ BHA #3 w/ 6 5/8" DP
out of the derrick f/ 1,521' MD to 2,641'
MD. Monitor disp via tt.
1,521.0 2,641.0
12/22/2022
14:30
12/22/2022
15:00
0.50 INTRM1, DRILL CIRC P Fill pipe and obtain spr's 2,641.0 2,641.0
12/22/2022
15:00
12/22/2022
15:30
0.50 INTRM1, DRILL WASH P Wash and ream f/ 2,641' MD to 2,503'
MD w/ GPM-1100, PSI-1385, FO-55%,
RPM-50, TQ-5-10K, up wt - 193k, s/o wt
- 187k, rot wt - 188k
2,641.0 2,503.0
12/22/2022
15:30
12/22/2022
16:00
0.50 INTRM1, DRILL DDRL P Control drill f/ 2,503' MD to 2,530' MD @
50 fph w/ GPM-1123, PSI-1420, FO-
55%, RPM-50, TQ-9-12K, WOB-6-8K up
wt - 193k, s/o wt - 187k, rot wt - 188k
2,503.0 2,530.0
12/22/2022
16:00
12/22/2022
16:15
0.25 INTRM1, DRILL DHEQ P At 2,530' MD increase flow rate to 1500
gpm, PSI-2450, FO-56% and shear xm
reamer.
2,530.0 2,530.0
12/22/2022
16:15
12/22/2022
21:00
4.75 INTRM1, DRILL DDRL P Control drill 17½ x 20" intermeditate 1
@ 50 fph f/ 2,530' MD t/ 2,702' MD w/
GPM-1500, PSI-2388, FO-55%, RPM-
60, TQ-8-12k, ECD-10.7, WOB-2-4k, up
wt - 200k, s/o wt - 190k, rot wt - 188k.
simops - build stands on the fly via xy
crane.
2,530.0 2,702.0
12/22/2022
21:00
12/22/2022
21:45
0.75 INTRM1, DRILL BKRM P BROOH to index reamer f/ 2,702' md to
2,539' md (center of xm reamer - 2,498)
w/ GPM-1220, PSI-1712, FO-52%, ROT
-30, TQ-7k, ECD-10.7, up wt - 184k, s/o
-202k, rot wt - 190k.
2,702.0 2,539.0
12/22/2022
21:45
12/22/2022
22:15
0.50 INTRM1, DRILL DHEQ P Obtain perameters @ 2,539' MD w/
GPM-1504, PSI-2496, FO-56%, turbine
speed - 4700. Index reamer as per
reamer rep. Observe lower PSI-2175
and turbine speed - 3930 confirming
reamer open. Ream dn f/ 2,539' MD to
2,544' MD. Stop rotation and pick up to
ledge. up wt - 194k. Observe 10k
overpull to confirm ream had opened.
Index reamer closed as per reamer rep.
2,539.0 2,544.0
12/22/2022
22:15
12/22/2022
22:30
0.25 INTRM1, DRILL TRIP P RIH on elevators f/ 2,544' md to 2,679'
md (XS2 cutters at 2,503). s/o wt -
187k.
2,544.0 2,679.0
12/22/2022
22:30
12/22/2022
23:00
0.50 INTRM1, DRILL DHEQ P Drop 2" od activation ball. Pump ball dn
at 50 gpm, 107 psi, 1% f/o. Increase
rate to GPM-200, PSI-69, FO-13%.
Observe ball on seat @ 125 stks 1126
psi. Index XM open. Increase rate to
GPM-1526, PSI-1830, FO-57% to
confirm XS2 & XM are open. Index XM
closed. Increase rate to 1800 gpm, 2830
psi, 64% f/o. Confirm XM closed w/
turbine speed - 4910.
2,679.0 2,679.0
12/22/2022
23:00
12/22/2022
23:15
0.25 INTRM1, DRILL TRIP P P/U to 2,657' md (center of XS2 at
2,480). Ream dn 5' to 2,662' MD w/
GPM-1800, PSI-2809, FO-63%, RPM-
60, TQ-8k, s/o wt - 183k. Stop rot and
p/u at rate. Observe 10k overpull at
2,651' MD.
2,679.0 2,657.0
12/22/2022
23:15
12/23/2022
00:00
0.75 INTRM1, DRILL UREM P Underream hole f/ 2,657' MD to 2,702'
MD w/ GPM-1800, PSI-2823, %fo-64,
RPM-80, TQ-9, WOB-3k,
2,657.0 2,702.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 18/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/23/2022
00:00
12/23/2022
06:00
6.00 INTRM1, DRILL DDRL P Drill 17½" x 20" intermediate 1 f/ 2,702'
MD to 3,020' MD w/ GPM-1800, PSI-
2844, %fo-60, RPM-150, TQ-9, WOB-
8k,
2,702.0 3,020.0
12/23/2022
06:00
12/23/2022
11:30
5.50 INTRM1, DRILL DDRL P Drill 17½" x 20" intermediate 1 f/ 3,020'
MD to 3.300' MD w/ GPM-1650, PSI-
2510, %fo-60, RPM-150, TQ-9-10k,
WOB-7-10k, ECD 10.89
PUW 204K SOW 201K RTW 203K
Bit hours 12.04
3,020.0 3,300.0
12/23/2022
11:30
12/23/2022
12:00
0.50 INTRM1, DRILL SVRG P Service pipeskate for building stand
offline, simops - circ b/u @ 1650 gpm,
2610 psi, and pump 40 bbl 10 ppb njut
plug sweep.
3,300.0 3,300.0
12/23/2022
12:00
12/23/2022
12:30
0.50 INTRM1, DRILL CIRC P Cont to circ 40 bbl 10 ppb nut plug
sweep to surface. simops - service st-
120 & st-100, and rig tongs.
3,300.0 3,300.0
12/23/2022
12:30
12/23/2022
16:00
3.50 INTRM1, DRILL RGRP T Break off stand R/U TIW and head pin to
hose and circulate the well while
replacing the Top Drive encoder.
3,300.0 3,300.0
12/23/2022
16:00
12/23/2022
16:30
0.50 INTRM1, DRILL SEQP P Test NOVOS enable switch & top drive.
(good). R/D head pin and high pressure
hose.
3,300.0 3,300.0
12/23/2022
16:30
12/23/2022
18:00
1.50 INTRM1, DRILL DDRL P Drill 17½" x 20" intermediate 1 f/ 3,300'
MD to 3.389' MD, 3,194 TVD w/ GPM-
1670, PSI-2600, %fo-60, RPM-150, TQ-
10-13k, WOB-9-11k, ECD 10.79 PUW
208K SOW 207K RTW 209K
3,300.0 3,389.0
12/23/2022
18:00
12/24/2022
00:00
6.00 INTRM1, DRILL DDRL P Drill 17½" x 20" intermediate 1 via
NOVOS f/ 3,389' MD to 3.763' MD 3,458
TVD, w/ GPM-1645, PSI-2745, %fo-61,
RPM-150, TQ-13-15k, WOB-12k, ECD
11.01, PUW 210K SOW 199K RTW
200K Bit hours - 17.63, Jar Hrs - 39.29
3,389.0 3,763.0
12/24/2022
00:00
12/24/2022
06:00
6.00 INTRM1, DRILL DDRL P Drill 17½" x 20" intermediate #1 f/3,763'
to 4,161' MD / 3,696' TVD, 1640 GPM,
2793 PSI, 10.86 ppg ECD,15k WOB,
140/150 RPM, 12/16k Trq, 208k P/U Wt,
199k SO Wt, 200k ROT wt.
3,763.0 4,161.0
12/24/2022
06:00
12/24/2022
10:30
4.50 INTRM1, DRILL DDRL P Drill 17½" x 20" intermediate #1 f/4,161'
to 4,342' MD / 3,790' TVD, 1640 GPM,
2840 PSI, 10.79 ppg ECD,15/20k WOB,
140/150 RPM, 12/16k Trq, 216k P/U Wt,
207k SO Wt, 209k ROT wt.
4,161.0 4,342.0
12/24/2022
10:30
12/24/2022
11:15
0.75 INTRM1, DRILL CIRC T Trouble shoot SLB Power Drive w/1740
GPM, 3250 PSI, 50 RPM, 5 K Trq.
Though we were having trouble
maintaining tool face. Ended up being
under-reamer was in a ratty formation.
4,342.0 4,342.0
12/24/2022
11:15
12/24/2022
13:30
2.25 INTRM1, DRILL CIRC P Perform 1000 bbl whole mud dilution
w/200 GPM, 130 PSI, 50 RPM, 5k Trq,
Reciprocate full stand.
4,342.0 4,342.0
12/24/2022
13:30
12/24/2022
18:00
4.50 INTRM1, DRILL DDRL P Drill 17½" x 20" intermediate #1 f/4,342'
to 4,520' MD / 3,878' TVD, 1790 GPM,
3100 PSI, 10.83 ppg ECD,17k WOB,
140/150 RPM, 16/18k Trq, 207k P/U Wt,
201k SO Wt, 207k ROT wt.
4,342.0 4,520.0
12/24/2022
18:00
12/25/2022
00:00
6.00 INTRM1, DRILL DDRL P Drill 17½" x 20" intermediate #1 f/4,520'
to 4,860' MD / 4,034' TVD, 1770 GPM,
3223 PSI, 10.93 ppg ECD,17k WOB,
140/150 RPM, 16/18k Trq, 207k P/U Wt,
201k SO Wt, 207k ROT wt. Bit Hrs:
32.04 / Jar Hrs 53.7
4,520.0 4,860.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 19/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/25/2022
00:00
12/25/2022
01:00
1.00 INTRM1, DRILL DDRL P Drill 17½" x 20" intermediate #1 f/4,860'
to 4,935' MD / 4,061' TVD, 1778 GPM,
3246 PSI, 10.85 ppg ECD,17k WOB,
140/150 RPM, 16/18k Trq, 207k P/U Wt,
206k SO Wt, 203k ROT wt.
4,860.0 4,935.0
12/25/2022
01:00
12/25/2022
02:00
1.00 INTRM1, DRILL CIRC P Circ B/U w/1773 GPM, 3271 PSI, 100
RPM, 8/10 k Trq.
4,935.0 4,935.0
12/25/2022
02:00
12/25/2022
02:30
0.50 INTRM1, DRILL OWFF P OWFF (Static) SIMOPS - B/D top drive 4,935.0 4,935.0
12/25/2022
02:30
12/25/2022
04:15
1.75 INTRM1, DRILL MPDA P Install RCD bearing. Break in bearing
and collect SPR's as per MPD advisor
4,935.0 4,935.0
12/25/2022
04:15
12/25/2022
06:00
1.75 INTRM1, DRILL DDRL P Drill 17½" x 20" intermediate #1 f/4,935'
to 4,990' MD / 4,076' TVD while
maintain 11.0 ppg EMW with MPD, 1650
GPM, 3000 PSI, 11.19 ppg ECD, 17k
WOB, 120 RPM, 12/20k Trq, 214k P/U
Wt, 195k SO Wt, 207k ROT wt.
4,935.0 4,990.0
12/25/2022
06:00
12/25/2022
11:00
5.00 INTRM1, DRILL DDRL P Drill 17½" x 20" intermediate #1 f/4,990'
to 5,255' MD / 4,168' TVD while
maintain 11.0 ppg EMW with MPD, 1650
GPM, 3000 PSI, 11.19 ppg ECD, 17k
WOB, 120 RPM, 12/20k Trq, 209k P/U
Wt, 195k SO Wt, 209k ROT wt. Bit Hrs
37.95 / Jar Hrs 59.61
4,990.0 5,255.0
12/25/2022
11:00
12/25/2022
11:30
0.50 INTRM1, DRILL MPDA P Perform draw down finger print test on
Qannik formation. OWFF (static)
5,255.0 5,255.0
12/25/2022
11:30
12/25/2022
13:30
2.00 INTRM1, DRILL MPDA P PJSM on removing RCD bearing. Pull
PS-21's and install master bushings.
Remove RCD bearing. B/D MPD
equipment. Re-install PS-21's
5,255.0 5,255.0
12/25/2022
13:30
12/25/2022
13:45
0.25 INTRM1, DRILL REAM P Wash and ream f/5,226' to 5,255'
w/1650 PSI, 2500 PSI, 100 RPM, 10k
Trq.
5,255.0 5,255.0
12/25/2022
13:45
12/25/2022
18:00
4.25 INTRM1, DRILL DDRL P Drill 17½" x 20" intermediate #1 f/5,255'
to 5,442' MD / 4,210' TVD, 1650 GPM,
3000 PSI, 11.19 ppg ECD, 17k WOB,
140 RPM, 17/19k Trq, 209k P/U Wt,
195k SO Wt, 209k ROT wt.
5,255.0 5,442.0
12/25/2022
18:00
12/26/2022
00:00
6.00 INTRM1, DRILL DDRL P Drill 17½" x 20" intermediate #1 f/5,442'
to 5,710' MD / 4,264' TVD, 1785 GPM,
3280 PSI, 10.8 ppg ECD, 16k WOB,
120 RPM, 16/19k Trq, 206k P/U Wt,
198k SO Wt, 201k ROT wt. Bit Hrs
43.88 / Jar Hrs 65.54
5,442.0 5,710.0
12/26/2022
00:00
12/26/2022
06:00
6.00 INTRM1, DRILL DDRL P Drill 17½" x 20" intermediate #1 f/5,710'
to 5,986' MD / 4,321' TVD, 1798 GPM,
3367 PSI, 10.81 ppg ECD, 24k WOB,
140 RPM, 21/24k Trq, 206k P/U Wt,
200k SO Wt, 204k ROT wt.
5,710.0 5,986.0
12/26/2022
06:00
12/26/2022
12:00
6.00 INTRM1, DRILL DDRL P Drill 17½" x 20" intermediate #1 f/5,986'
to 6,331' MD / 4,390' TVD, 1760 GPM,
3390 PSI, 11.28 ppg ECD, 24k WOB,
120 RPM, 22k Trq, 209k P/U Wt, 194k
SO Wt, 205k ROT wt. Bit Hrs 52.49 / Jar
Hrs 74.15
5,986.0 6,331.0
12/26/2022
12:00
12/26/2022
13:45
1.75 INTRM1, DRILL DDRL P Drill 17½" x 20" intermediate #1 f/6,331'
to 6,445' MD / 4,415' TVD, 1740 GPM,
3360 PSI, 11.41 ppg ECD,17k WOB,
120 RPM, 20/24k Trq, 209k P/U Wt,
194k SO Wt, 205k ROT wt. Bit Hrs
53.79 / Jar Hrs 75.45
6,331.0 6,445.0
12/26/2022
13:45
12/26/2022
15:00
1.25 INTRM1, TRIPCAS CIRC P Obtain final survey. Circ B/U w/1725
GPM, 3380 PSI, 120 RPM, 14/17k Trq.
Obtain SPR's and final T&D
6,445.0 6,445.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 20/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/26/2022
15:00
12/26/2022
15:15
0.25 INTRM1, TRIPCAS UREM P Obtain base line under reamer
parameters. 1500 GPM, 2688 PSI, 4000
TRPM, 205k ROT wt @ 30 RPM
6,445.0 6,445.0
12/26/2022
15:15
12/26/2022
16:00
0.75 INTRM1, TRIPCAS OWFF P B/D top drive. Rotae 10 rpm & OWFF
for 30 min (static)
6,445.0 6,445.0
12/26/2022
16:00
12/26/2022
17:00
1.00 INTRM1, TRIPCAS UREM P Break out single joint and drop 2.25"
under reamer closing ball. Pump down
at 97 GPM, ball on seat at 35 bbls/218
stks. Pressure up to 1664 psi and close
under reamer.
Reamer Open: 1500 GPM, 2688 PSI,
4000 TRPM, 205k ROT wt @ 30 RPM
Reamer Closed: 1500 GPM, 3080 PSI,
4630 TRPM, 201k ROT wt @ 30 RPM
6,445.0 6,445.0
12/26/2022
17:00
12/26/2022
17:45
0.75 INTRM1, TRIPCAS BKRM P BROOH f/6,445' to 6,298' w/1500 GPM,
3030 PSI, 20 RPM, 9/16k Trq.
6,445.0 6,298.0
12/26/2022
17:45
12/26/2022
20:30
2.75 INTRM1, TRIPCAS UREM P Index lower rat hole eliminator reamer
open as per SLB rep. Set 10k on 17-
1/2" ledge and confirm blades are
functioning properly. Under ream rat
hole f/6,298' to TD of 6,445' w/1600
GPM, 2775 PSI, 10k WOB, 120 RPM,
18/22k Trq. (Bottom of 17" hole = 6,404')
6,298.0 6,445.0
12/26/2022
20:30
12/26/2022
21:00
0.50 INTRM1, TRIPCAS UREM P Index rat hole eliminator reamer closed
as per SLB rep and L/D 1 single joint DP
f/6,445' to 6,431'
6,445.0 6,431.0
12/26/2022
21:00
12/27/2022
00:00
3.00 INTRM1, TRIPCAS CIRC P Perform 400 bbl dilution and circ and
condition mud/open hole w/1500 GPM,
2890 PSI, 100 - 120 RPM, 12/14k Trq.
204k ROT Wt. Reciprocate full stand.
6,431.0 6,431.0
12/27/2022
00:00
12/27/2022
06:00
6.00 INTRM1, TRIPCAS BKRM P BROOH f/6/431' to 4,870' w/1500 GPM,
2830 PSI, 11.31 ppg ECD, 100 RPM,
14/19k Trq, 203k ROT Wt, 700 ft/hr max
pulling speed.
6,431.0 4,870.0
12/27/2022
06:00
12/27/2022
12:00
6.00 INTRM1, TRIPCAS BKRM P BROOH f/4,870' to 3,200' w/1500 GPM,
2890 PSI, 11.74 ppg ECD, 150 RPM,
9/11k Trq, 196k ROT Wt, 700 ft/hr max
pulling speed.
4,870.0 3,200.0
12/27/2022
12:00
12/27/2022
12:30
0.50 INTRM1, TRIPCAS BKRM P BROOH f/3,200' to 3,019' w/1500 GPM,
2890 PSI, 11.74 ppg ECD, 150 RPM,
9/11k Trq, 196k ROT Wt, 700 ft/hr max
pulling speed.
3,200.0 3,019.0
12/27/2022
12:30
12/27/2022
14:30
2.00 INTRM1, TRIPCAS CIRC P Pump 70 bbl low vis sweep followed by
70 bbl high vis sweep and circ clean
w/1500 GPM, 2800 PSI, 100 RPM, 8k
Trq. Hole unloaded on B/U and packed
off flow box and flow line. Reduce flow
rate to 250 GPM while cleaning out flow
box.
3,019.0 3,019.0
12/27/2022
14:30
12/27/2022
16:45
2.25 INTRM1, TRIPCAS BKRM P BROOH f/3,019' to 2,740' w/1500 GPM,
2800, 100 RPM, 8k Trq, 196k ROT Wt,
700 ft/hr max pulling speed.
3,019.0 2,740.0
12/27/2022
16:45
12/27/2022
22:45
6.00 INTRM1, TRIPCAS BKRM P BROOH at reduced pulling speed while
working BHA into 20" casing f/2,740' to
2,272'. w/1500 GPM, 2800, 30 - 100
RPM, 8k Trq, Hole periodically unloaded
significant amounts of clay and caving's.
Caving's appeared to be coming from
Seabee formation. Pumped sweeps to
aid in hole cleaning and BHA balling.
Performed 400 bbl dilution to get mud
properties back in spec. (Did not rotate
thru liner hanger packer set depth)
2,740.0 2,272.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 21/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/27/2022
22:45
12/28/2022
00:00
1.25 INTRM1, TRIPCAS RGRP T Air boot on flow line failed resulting in a
3.1 bbl spill. (2 bbls inside of rig, 1 bbl
outside rig on exterior walls and mat
boards, and 2 gallons on pad). ACS and
security was notified. Cleaned up mud
from spill and replaced air boot.
Function tested new air boot (good)
2,272.0 2,272.0
12/28/2022
00:00
12/28/2022
06:00
6.00 INTRM1, TRIPCAS BKRM P BROOH f/2,272' to 695' w/1500 GPM,
2620, 100 RPM, 3k Trq, 196k ROT Wt,
Pumped low vis nut plug sweeps to aid
in hole cleaning and BHA balling at
2,090' and 695'
2,272.0 695.0
12/28/2022
06:00
12/28/2022
06:30
0.50 INTRM1, TRIPCAS OWFF P OWFF (Static) SIMOPS - B/D top drive. 695.0 695.0
12/28/2022
06:30
12/28/2022
07:00
0.50 INTRM1, TRIPCAS TRIP P PJSmM on L/D BHA. Rack back stand
#1 f/695' to 602'
695.0 602.0
12/28/2022
07:00
12/28/2022
07:30
0.50 INTRM1, TRIPCAS BHAH P L/D BHA f/602' to 464'. Rack back
HWDP & L/D drilling jars.
602.0 464.0
12/28/2022
07:30
12/28/2022
09:15
1.75 INTRM1, TRIPCAS BHAH T Un-able to break connection between
flex collar and accelerators. C/O dies in
ST-120 and still not able to break.
Steam connection and attempt to break
out again with ST-120 with no success.
Attempt to break with rig tongs with no
success. Decision made to L/D in one
piece.
464.0 464.0
12/28/2022
09:15
12/28/2022
16:00
6.75 INTRM1, TRIPCAS BHAH P Cont. L/D BHA f/464'. Bit grade – 1-1-CT
-G-X-I-NO-TD. Reamer grade -1-2-CT-G
-X-I-ER-TD. Over all BHA looked good.
464.0 0.0
12/28/2022
16:00
12/28/2022
17:30
1.50 INTRM1, TRIPCAS BHAH P Clean and clear floor of BHA tools and
equipment.
0.0 0.0
12/28/2022
17:30
12/28/2022
19:30
2.00 INTRM1, TRIPCAS WWWH P P/U stand of drill pipe and M/U stack
washer. Function rams and annular and
flush stack w/800 GPM. SIMOPS - Cont
to clear rig floor of BHA tools, XO's and
equipment.
0.0 0.0
12/28/2022
19:30
12/28/2022
21:00
1.50 INTRM1, TRIPCAS RURD P R/D stack washer and M/U wear ring
puller. Drain BOPE's and pull wear ring
as per Cameron rep.
0.0 0.0
12/28/2022
21:00
12/29/2022
00:00
3.00 INTRM1, TRIPCAS RURD P PJSM. C/O upper rams to 17" full body.
SIMOPS - prep to test rams. M/U test
plug and XO's t/17" test joint. C/O mud
pump liners to 5-1/2" on MP#4.
0.0 0.0
12/29/2022
00:00
12/29/2022
01:30
1.50 INTRM1, TRIPCAS RURD P Cont. R/U to test upper rams and 6-5/8"
TIW. Set test plug w/17" test joint as per
Cameron rep.
0.0 0.0
12/29/2022
01:30
12/29/2022
02:00
0.50 INTRM1, TRIPCAS BOPE P Test upper rams and spare 6-5/8" TIW
to 250 PSI for 5 min and 4000 PSI for
10 min.
0.0 0.0
12/29/2022
02:00
12/29/2022
03:30
1.50 INTRM1, TRIPCAS RURD P R/D testing equipment. Pull test plug
and L/D 17" test joint.
0.0 0.0
12/29/2022
03:30
12/29/2022
09:30
6.00 INTRM1, TRIPCAS RURD P R/U Doyon Casing tools and equipment.
Volant, bale extensions, 17" elevators,
and 17" spiders and 20" power tongs.
0.0 0.0
12/29/2022
09:30
12/29/2022
09:45
0.25 INTRM1, TRIPCAS SFTY P PJSM on running liner. Monitor well for 5
min.
0.0 0.0
12/29/2022
09:45
12/29/2022
11:15
1.50 INTRM1, TRIPCAS PUTB P M/U 17" P110-IC 88.1# liner shoe track
to 172' Shoe track baker-lok'd to the pin
of jt#4
0.0 172.0
12/29/2022
11:15
12/29/2022
11:45
0.50 INTRM1, TRIPCAS CIRC P Break cirulation and fill pipe. Check
floats (good)
172.0 172.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 22/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/29/2022
11:45
12/29/2022
16:00
4.25 INTRM1, CASING PUTB P RIH w/17" P110-IC 88.1# liner f/172' to
804'. M/U Trq 47k ft/lbs. Filling pipe on
the fly and topping off every 10 jts. SO
Wt 132k
172.0 804.0
12/29/2022
16:00
12/29/2022
16:30
0.50 INTRM1, CASING CIRC P Break cirulation on jt# 20. Stage flow
rate up to 5 BPM / 93 PSI. PU Wt 138k /
SO Wt 132k
804.0 804.0
12/29/2022
16:30
12/30/2022
00:00
7.50 INTRM1, CASING PUTB P RIH w/17" P110-IC 88.1# liner f/804' to
2,045'. M/U Trq 47k ft/lbs. Filling pipe on
the fly and topping off every 10 jts. SO
Wt 188k
804.0 2,045.0
12/30/2022
00:00
12/30/2022
02:15
2.25 INTRM1, CASING PUTB P RIH w/17" P110-IC 88.1# liner f/2,045' to
2,444'. M/U Trq 47k ft/lbs. Filling pipe on
the fly and topping off every 10 jts. SO
Wt 206k
2,045.0 2,444.0
12/30/2022
02:15
12/30/2022
04:00
1.75 INTRM1, CASING CIRC P Circ and condition mud. Stage flow rate
up to 10 BPM / 280 PSI. Add 400 bbls
new mud. 11.0 ppg In/Out
Torque and drag at 2,444'. PU Wt 272k
w/2 bpm, SO Wt 215k, ROT Wt 252k @
20 RPM, 15k Trq / 24k Trq break over.
2,444.0 2,444.0
12/30/2022
04:00
12/30/2022
14:00
10.00 INTRM1, CASING PUTB P RIH w/17" P110-IC 88.1# liner f/2,444' to
4,066'. M/U Trq 47k ft/lbs. Filling pipe on
the fly and topping off every 10 jts. SO
Wt 271k
2,444.0 4,066.0
12/30/2022
14:00
12/30/2022
18:15
4.25 INTRM1, CASING CIRC P Circ and condition mud prior to picking
up liner hanger. Stage flow rate up to
163 GPM, 190 PSI, PU Et 361k, SO Wt
300k, Even mud wt 11.0 p-pg In/Out.
Max mud wt observed 11.3 ppg.
4,066.0 4,066.0
12/30/2022
18:15
12/30/2022
20:45
2.50 INTRM1, CASING RURD P R/U liner hanger shuttle. P/U liner
hanger. M/U cement plugs to bottom of
liner hanger. R/U power tongs. M/U liner
hanger to liner. R/D doyon casing.
4,066.0 4,112.0
12/30/2022
20:45
12/30/2022
21:15
0.50 INTRM1, CASING CIRC P P/U single joint DP. Stage up pumps to
142 GPM, 178 PSI and confirm
circulation thru liner hanger (good)
4,112.0 4,143.0
12/30/2022
21:15
12/31/2022
00:00
2.75 INTRM1, CASING RUNL P RIH 17" liner on 6-5/8" DP f/4,143' to
4,325'. Tight hole f/4,260' to 4,300'. Had
to work pipe with pumps at 42 GPM /
200 PSI. Tight hole correlates to
formation change. PU Wt 354K, SO Wt
301k
4,143.0 4,325.0
12/31/2022
00:00
12/31/2022
12:30
12.50 INTRM1, CASING RUNL P RIH 17" liner on 6-5/8" DP f/4,325' to
6,404'.Tight hole f/4,430' to 4,480' and
through Qannik. PU Wt 370k w/3.5 bpm,
SO Wt 260k. No formation losses to
formation while running liner.
4,325.0 6,404.0
12/31/2022
12:30
12/31/2022
13:30
1.00 INTRM1, CEMENT RURD P R/U Citadel cement head. R/U cement
hoses.
6,404.0 6,404.0
12/31/2022
13:30
12/31/2022
20:30
7.00 INTRM1, CEMENT CIRC P Circ and condition mud for cement job.
Stage pumps up to 510 gpm, 564 psi.
SIMOPS - R/U cementers and prep for
cement job. PJSM on cementing at
21:30 Hrs
6,404.0 6,404.0
12/31/2022
20:30
12/31/2022
22:00
1.50 INTRM1, CEMENT CIRC T Had to swap out SLB cement pump unit.
Circ and condition mud for cement job.
Stage pumps up to 510 gpm, 564 psi.
SIMOPS - R/U cementers and prep for
cement job. PJSM on cementing at
21:30 Hrs
6,404.0 6,404.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 23/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
12/31/2022
22:00
1/1/2023
00:00
2.00 INTRM1, CEMENT CMNT P SLB flood lines w/5 bbls H2O and
pressure test to 6500 psi (good). Rig
pump 100 bbls 11.0 ppg Mud Push II at
5 bpm / 180 psi. Drop bottom dart. SLB
pump 382 bbls 11.0 ppg DeepCRETE
lead at 4.5 bpm / 200 psi, (Bottom dart
latched at 80.2 bbls into lead and
sheared at 1137 psi).
6,404.0 6,404.0
1/1/2023
00:00
1/1/2023
01:00
1.00 INTRM1, CEMENT CMNT P Shut down and wash up cement tubs
from lead. SLB pump 98 bbls 15.8 ppg
Liquid UniSLURRY tail at 4 bpm / 90 psi.
SLB pump 5 bbls H2O at 5 bpm / 50 psi.
Drop top dart. SLB pump 10 bbls H2O
at 5 bpm / 50 psi.
6,404.0 6,404.0
1/1/2023
01:00
1/1/2023
02:30
1.50 INTRM1, CEMENT CMNT T Turn over to rig for displacement.
Attempt to displace cement. Pump 55
bbls at 12 bpm / 100 psi. Slow down to 2
bpm for last 10 bbls and top dart should
have landed out on top plug. Saw no
indication of top dart landing out while
pumping at 2 bpm / 60 psi. Pumped an
additional 40 bbls and still no indication
of top dart landing out. Shut down and
trouble shoot mud pumps and
circulating system. Concluded that while
attempting to displace cement fluid was
bypassing thru pump #4 bleeder. Shut in
pump #4. Broke circulation and
immediately had pump pressure and
confirm top dart was on seat. Pressure
up to 2000 psi and shear out launching
top cement plug. Discuss plan forward
options with town Drilling
Superintendent. Decision made to
continue to displace cement and utilizing
calculated liner volume only.
6,404.0 6,404.0
1/1/2023
02:30
1/1/2023
04:30
2.00 INTRM1, CEMENT CMNT P Rig displace with 11.0 ppg FWP. Pump
900 bbls at 12 bpm / initial pump
pressure 740 psi and final pump
pressure 945 psi. Slow rate to 6 bpm /
initial pump pressure 380 psi and final
pump pressure 600 psi for 58 bbls Slow
rate to 3 bpm for remainder of
displacement / initial pump pressure 487
psi and final pump pressure 600 psi.
Pump 978 bbls total. Bump plug and
pressure up 500 psi over final circulating
pressure to 1100 psi and hold for 5 min.
Check floats. (good) CIP at 4:30 Hrs.
Full returns / zero down hole losses
during cementing and displacement.
6,404.0 6,404.0
1/1/2023
04:30
1/1/2023
06:00
1.50 INTRM1, CEMENT HOSO P Drop 3" hanger setting ball as per Dril-
Quip / Citadel reps. Isolate on mud
pump #4. Pressure up to 4,050 psi and
set liner hanger. Pressure drop to 2000
psi. Chase pressure back up to 4100 psi
and hold for 10 min. P/U to 425 k (75 k
over final P/U wt) Confirm liner hanger is
set. Slack off to drill string wt and
release the setting tool. (Bottom of
setting tool 2,235') Blow down top drive.
17" liner shoe 6,404' / 17" liner top
2,319'
6,404.0 2,235.0
1/1/2023
06:00
1/1/2023
07:00
1.00 INTRM1, CEMENT RURD P R/D cement hoses and L/D cement
head. M/U shock sub to bottom of single
jt DP. M/U top drive.
2,235.0 2,235.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 24/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/1/2023
07:00
1/1/2023
08:00
1.00 INTRM1, CEMENT CIRC P Pressure up to 5,285' and shear ball off
seat. Circ and condition mud 1529 gpm /
720 psi. Observe mud push and 2 bbls
cement at shakers on B/U.
2,235.0 2,235.0
1/1/2023
08:00
1/1/2023
08:30
0.50 INTRM1, CEMENT OWFF P OWFF (static) SIMOPS - L/D single joint
and shock sub.
2,235.0 2,235.0
1/1/2023
08:30
1/1/2023
10:30
2.00 INTRM1, CEMENT TRIP P POOH f/2,235' to liner running tools. 2,235.0 0.0
1/1/2023
10:30
1/1/2023
12:00
1.50 INTRM1, CEMENT RURD P R/U liner hanger shuttle. L/D liner
hanger assembly as per Dril-Quip rep.
0.0 0.0
1/1/2023
12:00
1/1/2023
15:30
3.50 INTRM1, CEMENT RURD P Clean rig and pits post cement job.
Clean drip pan, flow box, and under
shakers. Replace valves and seats in
MP#3
0.0 0.0
1/1/2023
15:30
1/1/2023
16:30
1.00 INTRM1, WHDBOP WWWH P M/U stack washer and flush stack.
Function rams and annular. SIMOPS -
cont. with pump maintenance and
cleaning pits.
0.0 0.0
1/1/2023
16:30
1/1/2023
19:15
2.75 INTRM1, WHDBOP RURD P Close blind rams and C/O upper pipe
rams to 4-1/2" x 7-5/8" VBR's. SIMOPS
- cont. with pump maintenance and
cleaning pits.
0.0 0.0
1/1/2023
19:15
1/1/2023
20:00
0.75 INTRM1, WHDBOP RURD P R/U for casing test 0.0 0.0
1/1/2023
20:00
1/1/2023
21:15
1.25 INTRM1, WHDBOP PRTS P Test 17" liner to 3000 psi and chart for
30 min (good). Pump 19 bbls / Bleed
back 16 bbls
0.0 0.0
1/1/2023
21:15
1/1/2023
22:00
0.75 INTRM1, WHDBOP RURD P R/D from casing test. Drain stack and
B/D choke / kill lines. Prep for N/D
BOPE.
0.0 0.0
1/1/2023
22:00
1/2/2023
00:00
2.00 INTRM1, WHDBOP NUND P PJSM on N/D. Remove MPD hoses.
Pull riser. N/D BOPE stack and high
pressure riser.
0.0 0.0
1/2/2023
00:00
1/2/2023
01:30
1.50 INTRM1, WHDBOP NUND P N/D BOPE stack and rack back on
pedestal. N/D high pressure riser and
drilling spool.
0.0 0.0
1/2/2023
01:30
1/2/2023
14:00
12.50 INTRM1, WHDBOP WWSP P PJSM. Remove annulus valves from
well head adaptor. Remove adaptor and
secure in BOPE deck. Clean and
inspect sealing surfaces for pack off and
locking rings seals. Observe grooving
on sealing face. Polish up grooves. Set
pack off and locking ring and test to
1300 psi for 15 min (good). N/U well
head and pad operator witness
orientation. Test hanger neck seal 3000
psi for 15 min (good). Test void 1600 psi
for 15 min (good). Test DCB connection
1300 psi for 15 min (good). Pull test well
head to 10k (good). SIMOPS - Clean
pits and take on new mud. C/O MP#4
liners back to 7", rebuild Strip-O-Matic,
housekeeping and P/M's.
0.0 0.0
1/2/2023
14:00
1/2/2023
21:00
7.00 INTRM1, WHDBOP NUND P N/U high pressure riser and drilling
adaptor. N/U BOPE's and MPD hoses
and 1502 hard lines. N/U flow liner riser
0.0 0.0
1/2/2023
21:00
1/2/2023
23:45
2.75 INTRM1, WHDBOP RURD P M/U 1 stand of DP below test plug. Set
test plug w/6-5/8" test joint as per
Cameron rep. R/U to test BOPE's. Fill
stack with H2O and purge air from
system.
0.0 0.0
1/2/2023
23:45
1/3/2023
00:00
0.25 INTRM1, WHDBOP BOPE P Start testing BOPE's. Test annular 250
psi low for 5 min / 2500 psi high for 10
min with 6-5/8" test joint.
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 25/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/3/2023
00:00
1/3/2023
08:00
8.00 INTRM1, WHDBOP BOPE P Test BOPE's to 250 psi for 5 min / 4000
psi for 10 min. Upper VBR's 4-1/2" X 7-
5/8", lower VBR's 3-1/2" X 6-5/8", choke
valves #1 - #16, choke/kill manuals &
HCR's, upper/lower IBOP, #1 and #2
FOSV, dart valve, and blind/shear rams.
Perform draw down on manual and
super choke. Test gas alarms and PVT
alarms. Perform Koomey draw down. 17
sec/200 psi, 78 sec/full pressure. 10
bottles 4025 psi average. AOGCC -
Adam Earl waive witness of test.
0.0 0.0
1/3/2023
08:00
1/3/2023
10:00
2.00 INTRM1, WHDBOP RURD P R/D testing equipment. L/D test joint,
test plug and rack back stand of DP that
was under test plug. Drain H2O from
stack. SIMOPS - prime all 4 mud pumps
w/FWP. Set seats on MP#3
0.0 0.0
1/3/2023
10:00
1/3/2023
12:00
2.00 INTRM1, WHDBOP RURD P P/U 2 joints of 5" DP and M/U wear ring
running tool. Set wear ring 11.595" ID
wear ring as per Cameron rep. L/D 5"
DP and running tool. Clean and clear
floor.
0.0 0.0
1/3/2023
12:00
1/3/2023
14:45
2.75 INTRM1, DRILLOUT RURD P Mobilize BHA tools and equipment to rig
floor. Replace air boots for upper riser
section. Install new rams in Strip-O-
Matic. Hang cement hose.
0.0 0.0
1/3/2023
14:45
1/3/2023
16:45
2.00 INTRM1, DRILLOUT BHAH T Wait on BHA direction from town.
Finalize hydraulics with CPA, SLB, and
Weatherford. SIMOPS - Test MPD
equipment to 2501200 psi for 5 min,
MP2's, house keeping.
0.0 0.0
1/3/2023
16:45
1/3/2023
23:15
6.50 INTRM1, DRILLOUT BHAH P M/U 15-3/4" X 17-1/2" Intermediate #2
BHA to 536'
0.0 536.0
1/3/2023
23:15
1/4/2023
00:00
0.75 INTRM1, DRILLOUT TRIP P RIH with drill pipe out of derrick f/536' to
1,375'. SO Wt 142k.
536.0 1,375.0
1/4/2023
00:00
1/4/2023
01:00
1.00 INTRM1, DRILLOUT TRIP P RIH with drill pipe out of derrick f/1,375'
to 2,213'. SO Wt 147k.
1,375.0 2,213.0
1/4/2023
01:00
1/4/2023
06:00
5.00 INTRM1, DRILLOUT RGRP T Break circulation and attempt to shallow
hole test directional tools. Not able to
build pressure and establish circulation.
Trouble shoot mud pumps. Mud pumps
#1 and #2 the pop offs wont stay reset
and actuators need to be replaced.
Pump #3 the charge pump is leaking
and needs to be changed out. Pump #4
by itself will not generate a high enough
flow rate to turn directional tools on.
Mechanic came out at 03:30 Hrs to
assist with the trouble shooting and
repairs.
2,213.0 2,213.0
1/4/2023
06:00
1/4/2023
07:45
1.75 INTRM1, DRILLOUT DHEQ P Shallow hole test directional and
MWD/LWD tools w/800 gpm/770 psi,
900 gpm/950 psi, 1000 gpm/1145 psi,
1100 gpm/1361 psi. All indications tools
are functioning properly.
2,213.0 2,213.0
1/4/2023
07:45
1/4/2023
08:30
0.75 INTRM1, DRILLOUT WASH P Wash down f/2,213' to 2,339' w/1000
gpm, 1118 psi, PU Wt 178k, SO Wt
176k, tag liner drillable pack off bushing
(DPOB) w/10 k
2,213.0 2,339.0
1/4/2023
08:30
1/4/2023
09:15
0.75 INTRM1, DRILLOUT DRLG P Drill out DPOB f/2,339' to 2,344' w/1000
gpm, 1120 psi, 50 rpm, 6 k trq, 3-6 k
wob, ROT Wt 182k, ream through 3X's
to confirm clear.
2,339.0 2,344.0
1/4/2023
09:15
1/4/2023
10:15
1.00 INTRM1, DRILLOUT CIRC P Circ B/U w/1150 gpm, 1440 psi and no
rotation. Reciprocate pipe f/2,344' to top
of liner at 2,319'.
2,344.0 2,344.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 26/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/4/2023
10:15
1/4/2023
13:15
3.00 INTRM1, DRILLOUT TRIP P RIH with stands out of derrick f/2,344' to
6,026'. SO Wt 184k
2,344.0 6,026.0
1/4/2023
13:15
1/4/2023
15:15
2.00 INTRM1, DRILLOUT SLPC P PJSM. Slip and cut drill line. Cut 54' of
drilling line. SIMOPS - Circ and
condition mud w/400 gpm, 250 psi.
6,026.0 6,026.0
1/4/2023
15:15
1/4/2023
16:30
1.25 INTRM1, DRILLOUT REAM P W&R f/6,026' to 6,268' w/800 gpm, 900
psi, 50 rpm, 15 k trq, ROT Wt 205 k.
TOC/cement plugs at 6,268' w/10 k wob.
6,026.0 6,268.0
1/4/2023
16:30
1/5/2023
00:00
7.50 INTRM1, DRILLOUT DRLG P Drill cement plugs and shoe track
f/6,268' to 6,404' w/800 - 1300 gpm, 900
- 2200 psi, 11.1 ppg ECD, 50 - 100 rpm,
12 - 24 k trq, ROT Wt 206k,
(Landing collar 6,271' - 6,274', Float
collar 6,316' - 6,318', and Float shoe
6,399' - 6,404')
6,268.0 6,404.0
1/5/2023
00:00
1/5/2023
01:30
1.50 INTRM1, DRILLOUT DRLG P Drill rat hole f/6,404' to 6,445' w/1250
gpm, 2000 psi, 11.1 ppg ECD, 8-10 k
wob, 60-80 rpm, 24/28 k trq, ROT Wt
206k,
6,404.0 6,445.0
1/5/2023
01:30
1/5/2023
02:00
0.50 INTRM1, DRILLOUT DDRL P Drill 20' new formation f/6,445' to 6,465'
MD / 4,419' TVD, w/1250 gpm, 2000 psi,
11.1 ppg ECD, 8-10 k wob, 120 rpm,
24/28 k trq, PU wt 255k, SO Wt 148k,
ROT Wt 202k, ADT .38 hrs / Jar hrs
75.83. PJSM on displacing to new mud.
6,445.0 6,465.0
1/5/2023
02:00
1/5/2023
04:30
2.50 INTRM1, DRILLOUT DISP P Pump 60 bbls high vis spacer and
displace to new 11.0 ppg FWP w/700
gpm, 650 psi, 30 rpm, 16-18 k trq. 1740
bbls surface to surface volume. (Tried
various flow rates and 700 gpm was the
sweet spot for receiving new fluid to the
tank farm) Once displacement was
finished pump out of open hole w/650
gpm / 600 psi f/6,465' to 6,400'
6,465.0 6,400.0
1/5/2023
04:30
1/5/2023
05:00
0.50 INTRM1, DRILLOUT OWFF P OWFF (static). SIMOPS - B/D top drive 6,400.0 6,400.0
1/5/2023
05:00
1/5/2023
05:30
0.50 INTRM1, DRILLOUT SVRG P Service rig, top drive, and draw works.
SIMOPS - C/O dies in top drive and
clean flow line and under shakers from
displacement.
6,400.0 6,400.0
1/5/2023
05:30
1/5/2023
07:00
1.50 INTRM1, DRILLOUT MPDA P PJSM. Break out double. Drain same
and drain riser. Install MPD bearing and
break in bearing as per MPD advisor.
6,400.0 6,400.0
1/5/2023
07:00
1/5/2023
07:30
0.50 INTRM1, DRILLOUT DHEQ P Downlink and cycle MWD/LWD tools to
clear the buffer.
6,400.0 6,400.0
1/5/2023
07:30
1/5/2023
08:30
1.00 INTRM1, DRILLOUT RURD P R/U for FIT. Break circ and flood lines
with 11.0 FWP
6,400.0 6,400.0
1/5/2023
08:30
1/5/2023
09:30
1.00 INTRM1, DRILLOUT FIT P Attempt to FIT to 15.0 ppg. Pump 8.5
bbls at .5 bpm. Pressure leak off at 667
psi for a 13.9 ppg EMW LOT. Hold
pressure for 10 min and bleed off
pressure. Bleed back 4.3 bbls.
6,400.0 6,400.0
1/5/2023
09:30
1/5/2023
09:45
0.25 INTRM1, DRILLOUT RURD P R/D testing equipment and B/D lines 6,400.0 6,400.0
1/5/2023
09:45
1/5/2023
10:30
0.75 INTRM2, DRILL MPDA P Circ at 900 gpm / 1016 psi and simulate
MPD connections with rig crew.
6,400.0 6,400.0
1/5/2023
10:30
1/5/2023
10:45
0.25 INTRM2, DRILL REAM P W&R f/6,400' to 6,465' w/1350 gpm,
2030 psi, 60 rpm, 15 k trq, ROT Wt 199
k.
6,400.0 6,465.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 27/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/5/2023
10:45
1/5/2023
12:30
1.75 INTRM2, DRILL DDRL P Drill ahead 15-3/4" hole f/6,465' to
6,543' MD / 4,435' TVD, 1330 gpm,
2040 psi, 11.90 ppg ECD, 25 k wob, 100
rpm, 24 k trq, PU Wt 231 k, SO Wt 157
k, ROT Wt 199 k, ADT 2.02 Hrs / Jar Hrs
77.47
6,465.0 6,543.0
1/5/2023
12:30
1/5/2023
13:15
0.75 INTRM2, DRILL UREM P Drop RFID tags and index Weatherford
Rip Tide reamer open. Pull test w/10 k
over pull against 17" shoe (good)
Reamer Closed = 1350gpm, 2080psi,
3580 TRPM power drive, 3985 TRPM
MWD
Reamer Open = 1350gpm, 1575psi,
2600 TRPM power drive, 2800 TRPM
MWD
6,543.0 6,543.0
1/5/2023
13:15
1/5/2023
18:00
4.75 INTRM2, DRILL DDRL P Drill ahead 15-3/4" x 17-1/2" hole
f/6,543' to 6,690' MD / 4,462' TVD, 1750
gpm, 2407 psi, 12.01 ppg ECD, 27 k
wob, 140 rpm, 24 k trq, PU Wt 226 k,
SO Wt 162 k, ROT Wt 196 k, ADT 2.49
Hrs / Jar Hrs 79.53. MPD connection
back pressure = 250 psi / 12.0 ppg
EMW
6,543.0 6,690.0
1/5/2023
18:00
1/6/2023
00:00
6.00 INTRM2, DRILL DDRL P Drill ahead 15-3/4" x 17-1/2" hole
f/6,690' to 7,090' MD / 4,542' TVD, 1794
gpm, 2572 psi, 12.16 ppg ECD, 27 k
wob, 140 rpm, 25 k trq, PU Wt 225 k,
SO Wt 170 k, ROT Wt 203 k, ADT 4.2
Hrs / Jar Hrs 83.73. MPD connection
back pressure = 250 psi / 12.0 ppg
EMW
6,690.0 7,090.0
1/6/2023
00:00
1/6/2023
06:00
6.00 INTRM2, DRILL DDRL P Drill ahead 15-3/4" x 17-1/2" hole
f/7,090' to 7,475' MD / 4,619' TVD, 1800
gpm, 2660 psi, 12.11 ppg ECD, 27 k
wob, 140 rpm, 21/27 k trq, PU Wt 229 k,
SO Wt 174 k, ROT Wt 201 k, ADT 4.2
Hrs / Jar Hrs 87.93. MPD connection
back pressure = 250 psi / 12.0 ppg
EMW
7,090.0 7,475.0
1/6/2023
06:00
1/6/2023
06:30
0.50 INTRM2, DRILL SVRG P Service rig, top drive and draw works. 7,475.0 7,475.0
1/6/2023
06:30
1/6/2023
12:00
5.50 INTRM2, DRILL DDRL P Drill ahead 15-3/4" x 17-1/2" hole
f/7,475' to 7,889' MD / 4,702' TVD, 1800
gpm, 2659 psi, 12.00 ppg ECD, 28 k
wob, 140 rpm, 21/27 k trq, PU Wt 228 k,
SO Wt 162 k, ROT Wt 199 k, ADT 3.36
Hrs / Jar Hrs 91.29. MPD connection
back pressure = 250 psi / 12.0 ppg
EMW
7,475.0 7,889.0
1/6/2023
12:00
1/7/2023
00:00
12.00 INTRM2, DRILL DDRL P Drill ahead 15-3/4" x 17-1/2" hole
f/7,889' to 8,725' MD / 4,882' TVD, 1800
gpm, 2805 psi, 11.96 ppg ECD, 29 k
wob, 160 rpm, 22/29 k trq, PU Wt 240 k,
SO Wt 166 k, ROT Wt 209 k, ADT 7.13
Hrs, Total bit Hrs 22.97 / Jar Hrs 98.42.
MPD connection back pressure = 250
psi / 12.0 ppg EMW
7,889.0 8,725.0
1/7/2023
00:00
1/7/2023
12:00
12.00 INTRM2, DRILL DDRL P Drill ahead 15-3/4" x 17-1/2" hole
f/8,725' to 9,821' MD / 5,108' TVD, 1788
gpm, 3083 psi, 12.04 ppg ECD, 30 k
wob, 160 rpm, 22/31 k trq, PU Wt 252 k,
SO Wt 160 k, ROT Wt 214 k, ADT 8.22
Hrs, Total bit Hrs 31.58 / Jar Hrs 107.03.
MPD connection back pressure = 250
psi / 12.0 ppg EMW
8,725.0 9,821.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 28/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/7/2023
12:00
1/8/2023
00:00
12.00 INTRM2, DRILL DDRL P Drill ahead 15-3/4" x 17-1/2" hole
f/9,821' to 10,957' MD / 5,340' TVD,
1789 gpm, 3046 psi, 12.01 ppg ECD, 30
k wob, 160 rpm, 25/34 k trq, PU Wt 268
k, SO Wt 168 k, ROT Wt 221 k, ADT
8.15 Hrs, Total bit Hrs 39.73 / Jar Hrs
115.18. MPD connection back pressure
= 250 psi / 12.0 ppg EMW
9,821.0 10,957.0
1/8/2023
00:00
1/8/2023
12:00
12.00 INTRM2, DRILL DDRL P Drill ahead 15-3/4" x 17-1/2" hole
f/10,957' to 12,026' MD / 5,562' TVD,
1788 gpm, 3161 psi, 12.08 ppg ECD, 30
k wob, 160 rpm, 28/37 k trq, PU Wt 271
k, SO Wt 183 k, ROT Wt 222 k, ADT
8.57 Hrs, Total bit Hrs 48.30 / Jar Hrs
123.75 MPD maintain 12.0 ppg EMW
on connections.
10,957.0 12,026.0
1/8/2023
12:00
1/8/2023
21:30
9.50 INTRM2, DRILL DDRL P Drill ahead 15-3/4" x 17-1/2" hole
f/12,026' to TD 12,607' MD / 5,583' TVD,
1796 gpm, 2931 psi, 11.99 ppg ECD, 19
k wob, 160 rpm, 27/32 k trq, PU Wt 277
k, SO Wt 196 k, ROT Wt 225 k, ADT 7
Hrs, Total bit Hrs 55.3 / Jar Hrs 130.75
MPD maintain 12.0 ppg EMW on
connections. Added 1500 bbls new mud
on last stand drilled. Pump up final
survey and collect T&D
12,026.0 12,607.0
1/8/2023
21:30
1/9/2023
00:00
2.50 INTRM2, TRIPCAS CIRC P Circ and condition mud/hole for 2+ B/U
w/1780 gpm, 3235 psi, 11.99 ppg ECD,
180 rpm, 29 k trq, Reciprocate 60'
12,607.0 12,607.0
1/9/2023
00:00
1/9/2023
01:30
1.50 INTRM2, TRIPCAS UREM T Attempt to close reamer with pressure
differential cycle. Cycle pumps 1800
gpm / 3050 psi and 1450 gpm / 2175 psi
as per Weatherford pressure cycle
procedure. Reduce pumps to 1350 gpm
and collect base parameters. Drop RFID
tags as per Weatherford rep and pump
thru BHA. Return to base line
parameters and all indications that
reamer did not cycle closed. (Down link
close cycle was un-successful / RFID
close method was also un-successful).
12,607.0 12,607.0
1/9/2023
01:30
1/9/2023
03:15
1.75 INTRM2, TRIPCAS UREM P Attemtp again to close Under Reamer.
Drop second round of RFID tags and
while pumping tags down perform
pressure differential cycle procedure.
Return to base line parameters and
reamer closed on second attempt.
Collect final T&D, PU wt 260 k, SO Wt
200k, ROT Wt 230 k, 30 rpm, 22 k trq
Reamer Open = 1350 gpm, 1930 psi,
2600 PD TRPM, 2968 MWD TRPM,
ROT Wt 230 k, 24 k trq at 30 rpm
Reamer Closed = 1350 gpm, 2300 psi,
3250 PD TRPM, 3750 MWD TRPM,
ROT Wt 230 k, 22 k trq at 30 rpm
12,607.0 12,607.0
1/9/2023
03:15
1/9/2023
04:00
0.75 INTRM2, TRIPCAS OWFF P OWFF. Rotate at 10 rpm. Initially trap
12.0 ppg EMW and slowly decrease to
11.0 ppg EMW. Monitor returns on trip
tank during draw down. Decrease at .5
ppg increments and gain total of 7 bbls
back in trip tank. Open up bleeder and
take returns to cellar and confirm no
flow. Well static after 30 min.
12,607.0 12,607.0
1/9/2023
04:00
1/9/2023
04:30
0.50 INTRM2, TRIPCAS BKRM P Line up pump #4 for dynamic MPD
connections.
12,607.0 12,100.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 29/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/9/2023
04:30
1/9/2023
06:00
1.50 INTRM2, TRIPCAS BKRM P BROOH f/12,607' to ~12,319' w/1350
gpm, 2250 psi, 150 rpm, 22 k trq. MPD
300 psi maintain 12.0 ppf EMW on
connections.
12,607.0 12,319.0
1/9/2023
06:00
1/9/2023
12:00
6.00 INTRM2, TRIPCAS BKRM P BROOH f/12,319' to 10149' w/1350
gpm, 2354 psi, 160 rpm, 28 k trq. MPD
300 psi maintain 12.0 ppf EMW on
connections.
12,319.0 12,000.0
1/9/2023
12:00
1/9/2023
18:00
6.00 INTRM2, TRIPCAS BKRM P BROOH f/ 10149' to 8770' w/1350 gpm,
2232 psi, 140 rpm, 22 k trq. MPD 300
psi maintain 12.0 ppf EMW on
connections.
12,000.0 8,770.0
1/9/2023
18:00
1/10/2023
00:00
6.00 INTRM2, TRIPCAS BKRM P BROOH f/ 8770' to 7667' w/1350 gpm,
2020 psi, 140 rpm, 24 k trq. MPD 300
psi maintain 12.0 ppf EMW on
connections. P/U 220 S/O 170K RT WT
196k
8,770.0 7,667.0
1/10/2023
00:00
1/10/2023
05:00
5.00 INTRM2, TRIPCAS BKRM P BROOH f/ 7667' to w/1350 gpm, 2020
psi, 140 rpm, 24 k trq. MPD 300 psi
maintain 12.0 ppf EMW on connections.
P/U 220 S/O 170K RT WT 196k
7,667.0 6,770.0
1/10/2023
05:00
1/10/2023
06:00
1.00 INTRM2, TRIPCAS CIRC P Circulate at 1335 gpm with 1950 psi wtih
150 RPMs and 23k to 28k torque.
6,770.0 6,770.0
1/10/2023
06:00
1/10/2023
08:00
2.00 INTRM2, TRIPCAS BKRM P BROOH from 6,771‘ MD to 6,400‘ MD.
350 gpm, 505 psi, 30 RPM with 26k
torque. Flow out at 22%, ECD's at
12.30 ppg. P/U wt 225k, S/O wt 165k,
ROT wt 196k @ 350 gpm.
Hold 300 psi on connections. No
rotation while pulling into the shoe.
6,770.0 6,400.0
1/10/2023
08:00
1/10/2023
09:00
1.00 INTRM2, TRIPCAS CIRC P Circulate bottoms up. 1,350 gpm with
1932 psi. Flow out 51%.
6,400.0 6,400.0
1/10/2023
09:00
1/10/2023
09:15
0.25 INTRM2, TRIPCAS CIRC P Drop 3.25" steel ball to open well
commander as per DD. Pump ball
down at 120 gpm with 400 psi. Ball seat
at 200 strokes, well commander open at
2,208 psi.
6,400.0 6,400.0
1/10/2023
09:15
1/10/2023
11:00
1.75 INTRM2, TRIPCAS CIRC P Circulate wellbore. 1800 gpm with 1395
psi. Pump 75 bbl low vis sweep
followed by 75 bbl high vis sweep. Total
strokes pumped - 16,300
6,400.0 6,400.0
1/10/2023
11:00
1/10/2023
11:30
0.50 INTRM2, TRIPCAS OWFF P Blow down TDS. Prep floor and pits for
SOOH.
6,400.0 6,400.0
1/10/2023
11:30
1/10/2023
15:45
4.25 INTRM2, TRIPCAS SMPD P SOOH from 6400' to 2645'. P/U wt
215k, MPD holding 360 psi.
6,400.0 2,645.0
1/10/2023
15:45
1/10/2023
16:30
0.75 INTRM2, TRIPCAS MPDA P PJSM, Remove MPD bearing as per
SOP.
2,645.0 2,645.0
1/10/2023
16:30
1/10/2023
17:00
0.50 INTRM2, TRIPCAS CIRC P Circulate wellbore at 2,645'. 1800 gpm
with 892 psi. Flow out 56%. 6,440 total
strokes pumped.
2,645.0 2,645.0
1/10/2023
17:00
1/10/2023
17:30
0.50 INTRM2, TRIPCAS OWFF P B/D top drive, prep floor and pits for
POOH, 15 min flow check (static).
2,645.0 2,645.0
1/10/2023
17:30
1/10/2023
18:00
0.50 INTRM2, TRIPCAS TRIP P POOH from 2,645' to 2,209'. P/U wt
175k. Monitor hole via trip tank.
Correct fill noted.
2,645.0 2,209.0
1/10/2023
18:00
1/10/2023
19:30
1.50 INTRM2, TRIPCAS TRIP P Pooh f/ 2,209' t/ 626' puw= 96k, monitor
hole file via t.t
POOH from 2,209' to 626'. P/U wt 96k.
Monitor hole via trip tank. Correct fill
noted.
2,209.0 626.0
1/10/2023
19:30
1/10/2023
20:00
0.50 INTRM2, TRIPCAS OWFF P OWFF for 15min (static). PJSM for
laying down intermediate 2 BHA.
626.0 626.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 30/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/10/2023
20:00
1/11/2023
00:00
4.00 INTRM2, TRIPCAS BHAH P Lay down Intermediate 2 BHA as per slb
DD from 626' to 150'. Monitor hole via
trip tank.
626.0 150.0
1/11/2023
00:00
1/11/2023
01:45
1.75 INTRM2, TRIPCAS BHAH P Lay down Intermediate 2 BHA as per
SLB DD from 150' to bit. Monitor hole
via trip tank. Correct fill.
0.0 0.0
1/11/2023
01:45
1/11/2023
04:00
2.25 INTRM2, CASING CLEN P Clean and clear rig floor. Remove all
directional equipment and subs, Bit and
Bit Breaker.
0.0 0.0
1/11/2023
04:00
1/11/2023
05:30
1.50 INTRM2, CASING WWWH P M/U stack jetting tool on 1 stand 6 5/8"
DP, Was stack with 1080 GPM and10
RPM. Blow down top drive.
0.0 0.0
1/11/2023
05:30
1/11/2023
08:00
2.50 INTRM2, CASING RURD P Drain BOP stack and change out
elevators, change upper rams to 13-5/8"
solid body rams. Prepare to pull wear
ring. SIMOPS conducting pump
maintenance.
0.0 0.0
1/11/2023
08:00
1/11/2023
12:00
4.00 INTRM2, CASING RURD P Make up 2 joints of 6-5/8" drill pipe and
wear ring running tool, attempt to pull
wear ring, unable to get J hooks to
engage. Make up stack jetting tool and
wash at max rate. Drain stack and pull
wear ring as per Cameron rep.
0.0 0.0
1/11/2023
12:00
1/11/2023
14:00
2.00 INTRM2, CASING RURD P Lay down 2 joints of 6-5/8" drill pipe and
wear ring running tool, Make up test
joint and pups. Set BOP test plug with
13-5/8" test joint on 1 stand of 6-5/8"
drill pipe below test plug as per SOP.
Flood BOP with H2O and notice leak in
driller side ram door on top ram.
0.0 0.0
1/11/2023
14:00
1/11/2023
15:00
1.00 INTRM2, CASING RURD T Drain BOP close blind rams bleed off
Koomey and open upper ram door and
replace seal on ram door.
SIMOPS continue pump maintenance.
0.0 0.0
1/11/2023
15:00
1/11/2023
16:00
1.00 INTRM2, CASING BOPE P Set 13-5/8" test plug , fill stack with H2O
and test upper solid body rams to 250
psi low for 5 minutes and 4000 psi high
for 10 minutes , charted.
0.0 0.0
1/11/2023
16:00
1/11/2023
18:00
2.00 INTRM2, CASING RURD P Mobilize Doyon casing equipment. M/U
13 5/8" Hanger and Landing Jt. Perform
dummy run as per Cameron hand.
Landed out on shoulder, Witness by
COP Rep.
0.0 0.0
1/11/2023
18:00
1/11/2023
18:45
0.75 INTRM2, CASING RURD P L/D Hanger and Landing JT. as per
Cameron Rep.
0.0 0.0
1/11/2023
18:45
1/11/2023
23:15
4.50 INTRM2, CASING RURD P Rig up to Run 13 5/8" 88.2# L-80 IC
Hydril-563 casing. P/U long bales and 6'
Bale Extensions, P/U 13 5/8" Volant
CRT, Casing Spiders, Verify 13 5/8"
casing swedge on rig with TIW install
prior to run casing
0.0 0.0
1/11/2023
23:15
1/12/2023
00:00
0.75 INTRM2, CASING PUTB P PJSM, Verify casing count, P/U shoe
track, Change out Collars on #2 and #3
jts, Baker lock each Collar as per casing
program
0.0 60.0
1/12/2023
00:00
1/12/2023
02:30
2.50 INTRM2, CASING PUTB P Cont. P/U 13 5/8" shoe Baker Lock each
collar and connection, Pump through
Floats, Check floats are holding, Fill
shoe track with 30 bbl's 11 ppg mud
60.0 211.0
1/12/2023
02:30
1/12/2023
03:00
0.50 INTRM2, CASING OWFF P Blow Down Top Drive, Verify floats are
holding.
211.0 211.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 31/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/12/2023
03:00
1/12/2023
06:00
3.00 INTRM2, CASING PUTB P P/U and Run 13 5/8" 88.2# L-80 IC
Hydril 563 casing as per casing tally f/
211' to 901'
Monitoring displacement via Pit 5
Getting Displacement strap every jt.
211.0 901.0
1/12/2023
06:00
1/12/2023
12:00
6.00 INTRM2, CASING PUTB P P/U and Run 13 5/8" 88.2# L-80 IC
Hydril casing as per tally, f/ 901 to 3428'
Monitor displacements via Pit #5
Strapping every 5 jts. SOW=82K @
3200' RPM=20 TQ=6K RW=101K
901.0 3,428.0
1/12/2023
12:00
1/12/2023
20:00
8.00 INTRM2, CASING PUTB P P/U and Run 13 5/8" 88.2# L-80 IC
Hydril casing as per tally, f/ 3428' to
7000' Monitor Displacements via Pit #5
Strapping every 5 jts. RW=95K TQ=13K
@ 6398' in casing. Loss S/O Weight at
6613' SOW 63K,
3,428.0 6,613.0
1/12/2023
20:00
1/12/2023
21:00
1.00 INTRM2, CASING PUTB P P/U and Run 13 5/8" 88.2# L-80 IC
Hydril casing as per tally, RIH f/ 6613' to
7000'Rotating each Jt. RPM=20
TQ=11K SO/RW 85K
6,613.0 7,000.0
1/12/2023
21:00
1/13/2023
00:00
3.00 INTRM2, CASING PUTB P P/U and Run 13 5/8" 88.2# L-80 IC
Hydril casing as per tally, RIH f/ 7000' to
7728' Rotating each Jt. RPM=20
TQ=10K SO/RW= 85K Monitoring
Displacement Via #5 Pit Strapping every
5 Jts.
7,000.0 7,728.0
1/13/2023
00:00
1/13/2023
02:30
2.50 INTRM2, CASING PUTB P P/U and Run 13 5/8" 88.2# L-80 IC
Hydril casing as per tally, RIH f/ 7728' to
8300' Rotating each Jt. RPM=20
TQ=10K SO/RW= 85K Monitoring
Displacement Via #5 Pit Strapping every
5 Jts.
7,728.0 8,300.0
1/13/2023
02:30
1/13/2023
02:45
0.25 INTRM2, CASING OWFF P OWFF 15 Min Observe 2 BBL,
Discrepancy in Displacement strap at
Pits, Found that casing jts had
increased in length by1' to 2' Per-Jt.
which increased Displacement values.
Displacement was correct. OWFF
Well Static.
8,300.0 8,300.0
1/13/2023
02:45
1/13/2023
06:00
3.25 INTRM2, CASING PUTB P P/U and Run 13 5/8" 88.2# L-80 IC
Hydril casing as per tally, RIH f/ 8300' to
9008' Rotating each Jt. RPM=20
TQ=10K SO/RW= 74K Monitoring
Displacement Via #5 Pit Strapping every
5 Jts.
8,300.0 9,008.0
1/13/2023
06:00
1/13/2023
12:00
6.00 INTRM2, CASING PUTB P P/U and Run 13 5/8" 88.2# L-80 IC
Hydril casing as per tally, RIH f/ 9008' to
10395' Rotating each Jt. RPM=20
TQ=10K SO/RW= 74K Monitoring
Displacement Via #5 Pit Strapping every
5 Jts.
9,008.0 10,395.0
1/13/2023
12:00
1/13/2023
18:00
6.00 INTRM2, CASING PUTB P P/U and Run 13 5/8" 88.2# L-80 IC
Hydril casing as per tally, RIH f/ 10395'
to 11638' Rotating each Jt. RPM=20
TQ=10K/12K SO/RW= 80K Monitoring
Displacement Via #5 Pit Strapping every
5 Jts.
10,395.0 11,638.0
1/13/2023
18:00
1/14/2023
00:00
6.00 INTRM2, CASING PUTB P P/U and Run 13 5/8" 88.2# L-80 IC
Hydril casing as per tally, RIH f/ 11638'
to 12604 Rotating each Jt. RPM=20
TQ=10K/12K SO/RW= 80K Monitoring
Displacement Via #5 Pit Strapping every
5 Jts. Obtain Final P/U 177K S/O 67K
with no rotation
11,638.0 12,604.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 32/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/14/2023
00:00
1/14/2023
02:30
2.50 INTRM2, CASING HOSO P P/U Cameron 13 5/8" casing hanger,
M/U to 13 5/8" casing Jt # 303. Work
casing hanger down S/O 55K P/U 13
5/8" Landing Jt M/U to 13 5/8" hanger,
Work Hanger down and land out Hanger
on depth. Verify Hanger on Depth Via IA
valve. Cameron and COP Rep's.
12,599.0 12,599.0
1/14/2023
02:30
1/14/2023
05:00
2.50 INTRM2, CEMENT CLEN P Clean and Clear Rig Floor, Mobilize
Equipment for filling 13 5/8" casing and
bleeding air. R/U equipment,
Monitoring well Via Trip Tank.
12,599.0 12,599.0
1/14/2023
05:00
1/14/2023
05:30
0.50 INTRM2, CEMENT OTHR P SIMOPS Taking on 11.0 PPG mud at
Mud pits
Fluid Pack and prime Mud Pumps.
Pressure test #1-4 Pumps due to
changing liners to 6" before filling 13
5/8" casing with 11.0 ppg mud.
12,599.0 12,599.0
1/14/2023
05:30
1/14/2023
06:00
0.50 INTRM2, CEMENT CIRC P PJSM
Start Pumping at 200 GPM, filling 13
5/8" casing w/ 11.0 PPG mud and
bleeding air. Total Mud pumped 142
BBLS
12,599.0 12,599.0
1/14/2023
06:00
1/14/2023
10:00
4.00 INTRM2, CEMENT CIRC P Cont. filling 13 5/8" casing W/ 11.0 PPG
mud @ 230 GPM, 68PSI @ 911BBLS
pumped. Shut Down and bleed air off for
60 Minutes
12,599.0 12,599.0
1/14/2023
10:00
1/14/2023
12:15
2.25 INTRM2, CEMENT CIRC P Cont. filling 13 5/8" casing W/ 11.0 PPG
mud @ 230 GPM, 68PSI @ 480 BBLS
pumped. Shut Down and Bleed Air off
for 45 Minutes.
Total Mud Pumped 1391 BBLS.
12,599.0 12,599.0
1/14/2023
12:15
1/14/2023
16:30
4.25 INTRM2, CEMENT CIRC P Cont. Filling 13 5/8" casing W/ 11.0 PPG
mud @ 230 GPM, 68PSI @ 489 BBLS
pumped. Shut Down and bleed air off for
45 Minutes.
Total Mud Pumped 1880 BBLS.
12,599.0 12,599.0
1/14/2023
16:30
1/14/2023
16:45
0.25 INTRM2, CEMENT OWFF P OWFF. Shut off hole fill and monitor well
for 15 min. Well Static.
12,599.0 12,599.0
1/14/2023
16:45
1/14/2023
19:45
3.00 INTRM2, CEMENT RURD P Rig Down 13 5/8" casing filling
equipment, Blow down all mud surface
lines, Rig Down Casing Equipment. R/U
high pressure equipment for circulating
and up coming 13 5/8" cement job, R/U
Chart Recorder.
12,599.0 12,599.0
1/14/2023
19:45
1/14/2023
20:00
0.25 INTRM2, CEMENT PRTS P Fluid Pack Surface Equipment and
shell test T/3500 psi for 5 min. Test
good.
12,599.0 12,599.0
1/14/2023
20:00
1/15/2023
00:00
4.00 INTRM2, CEMENT CIRC P Establish circulation parameters, staging
flow rate up @ 1 BPM increments f/
1BPM 376 psi F/O 3% T/ 5 BPM 520
psi F/O 3% T/ 10BPM 748 PSI F/O
8% T/ 12 BPM 823 psi F/O 20%.
SIMOPS Blowing down cement line and
clean Rig Floor from past Casing Run.
12,599.0 12,599.0
1/15/2023
00:00
1/15/2023
02:00
2.00 INTRM2, CEMENT CIRC P Circulate clean mud to ensure no air on
back side for coming up Cement job.
GPM=500 PSI=786 F/O 20% Total
Strokes pumped 28000 STKS. MDWT
at Bottoms up 11.1 ppg.
12,599.0 12,599.0
1/15/2023
02:00
1/15/2023
02:30
0.50 INTRM2, CEMENT SFTY P PJSM W/ SLB on Cement operations for
13 5/8" casing cement job
12,599.0 12,599.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 33/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/15/2023
02:30
1/15/2023
07:30
5.00 INTRM2, CEMENT CMNT P Pump 100 BBLS 13 PPG mud push via
rig @ 7 BPM 390= PSI 2% F/O chase
w/ 5 BBL H2O Via SLB. Pressure Test
surface lines T/ 3500 PSI F/ 5min Drop
Bottom plug pump 194 BBLS 15.8 PPG
Tail cement @6 BPM 350 PSI W/ Full
Returns Drop Top Plug chase w/ 20
BBLS H2O @ 6 BPM 200 PSI Swap to
Rig Pump Displace Cement W/ 11.0
PPG Mud @ 10 BPM @ 320 PSI. Mud
push at shoe 13270 strokes 380 PSI.
Reduce rate to 3 BPM. Land bottom
plug and observe pressure build to 516
PSI and drop to 412 PSI when the burst
disc shears @13930 strokes. Continue
pumping at 6 BPM and reduce down to
3 BPM at 14900 strokes observe top
plug land at 15,550 strokes FCP 900
PSI, Continue pumping to 15,578 stokes
to 1400 PSI final strokes and hold 1400
PSI for 5 minutes. Full returns
throughout cement Job.
12,599.0 12,599.0
1/15/2023
07:30
1/15/2023
08:30
1.00 INTRM2, CEMENT CMNT P Bleed off additional 500 PSI and open
cement valve on Volant to atmosphere,
observe small amount of flow for 5
minutes then reducing down 2 quarts
per minute. Continue to monitor for the
next 45 minutes and observe flowback
rate is not reducing. Shut in and allow
cement to build to 50 PSI compressive
strength.
12,599.0 12,599.0
1/15/2023
08:30
1/15/2023
15:30
7.00 INTRM2, CEMENT WOC T Wait for cement to reach 50 PSI
compressive strength before rigging
down.
Simops prep 5-7/8" drill pipe for INT3
and begin L/D 6-5/8" drill pipe from the
derrick.
Clean Pits, Clean cement valves.
12,599.0 12,599.0
1/15/2023
15:30
1/15/2023
16:00
0.50 INTRM2, CEMENT OWFF P Bleed PSI off from 250 psi to O psi,
Monitor well for 30 min
12,599.0 12,599.0
1/15/2023
16:00
1/15/2023
16:15
0.25 INTRM2, CEMENT RURD P R/D 1502 Cementing equip from Volant
tool
12,599.0 12,599.0
1/15/2023
16:15
1/15/2023
17:00
0.75 INTRM2, CEMENT RURD P Back out and Pull landing Jt. Break
Connection w/ Volant tool and Landing
Jt. in two pieces to handled down
beaver slide.
12,599.0 12,599.0
1/15/2023
17:00
1/15/2023
18:00
1.00 INTRM2, CEMENT RURD P R/D Clean and Remove Casing
equipment Bales, Strap Tongs,
Elevators Volant Slips, Crew Change
12,599.0 12,599.0
1/15/2023
18:00
1/15/2023
21:30
3.50 INTRM2, WHDBOP RURD P R/D Clean and Remove Casing
Equipment, Bales, Strap Tongs, Volant
Tool, Slips, R/u Bales and Rig Elevators
for Jetting and setting Cameron Packoff.
12,599.0 12,599.0
1/15/2023
21:30
1/15/2023
23:00
1.50 INTRM2, WHDBOP WWWH P M/U Cameron Profile Jetting tool on
STD 6 5/8" Drill Pipe. Jet Profile as Per
Cameron Rep.RPM=5 GPM=800 60
BBLS pumped Lig Water. L/D Jetting
Tool, Pump Out Stack
12,599.0 12,599.0
1/15/2023
23:00
1/16/2023
00:00
1.00 INTRM2, WHDBOP WWSP P M/U Cameron Pack off Setting Tool as
Per Cameron Rep.
12,599.0 12,599.0
1/16/2023
00:00
1/16/2023
01:30
1.50 INTRM2, WHDBOP WWSP P Cont. R/U Cameron Packoff Running
Tool as per Cameron Rep.
12,599.0 12,599.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 34/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/16/2023
01:30
1/16/2023
02:30
1.00 INTRM2, WHDBOP WWSP P RIH w/ Cameron Packoff, Sit Down 10K
Set Pack off, Pull 50K over to verify
Packoff is Set. Test Packoff to 5000 psi
for 15 Min. Witness By COP Rep.
Packoff ID 12.9375"
12,599.0 12,599.0
1/16/2023
02:30
1/16/2023
04:00
1.50 INTRM2, WHDBOP RURD P L/D Cameron Packoff Running Assy as
per SOP and Cameron Rep.
12,599.0 12,599.0
1/16/2023
04:00
1/16/2023
06:00
2.00 INTRM2, WHDBOP FRZP P SIMOPS Changing out Top Rams to 4
1/2" x 7 5/8" VBR"S
Note: R/U LRS Freeze Protect @ 20" x
13 5/8" Pump Rate @ 2 BPM PSI=700
12,599.0 12,599.0
1/16/2023
06:00
1/16/2023
08:00
2.00 INTRM2, WHDBOP FRZP P Cont. LRS, Freeze Protect @ 20" x 13
5/8" Pump Rate @ 2 BPM PSI=700
Bring Thread Protectors to Rig Floor
and Prepare Rig floor to L/D 6 7/8" Drill
pipe, Clean 135/8" Rams and store
12,599.0 12,599.0
1/16/2023
08:00
1/16/2023
10:15
2.25 INTRM2, WHDBOP RURD P R/U to Test BOPE, M/U 6 5/8" TIW
valves and Dart Valves Mobilize 5 7/8"
TIW Valves to rig floor M/U valves.
12,599.0 12,599.0
1/16/2023
10:15
1/16/2023
11:30
1.25 INTRM2, WHDBOP WWWH P M/U stack washer on STD of 6 5/8" Drill
pipe. Space out in Stack. Function
Annular and LPR'S Wash Ram Cavities.
B/D TD
12,599.0 12,599.0
1/16/2023
11:30
1/16/2023
12:00
0.50 INTRM2, WHDBOP RURD P M/U 5 7/8" Test Jt. Pup Jt and Test Plug
As per Cameron Rep.
12,599.0 12,599.0
1/16/2023
12:00
1/16/2023
12:45
0.75 INTRM2, WHDBOP RURD P Cont. M/U 5 7/8" Test Jt, Pup Jts, and
Test Plug on Stand of 6 5/8" Drill Pipe
Install Test Torpedo on Top Drive.
12,599.0 12,599.0
1/16/2023
12:45
1/16/2023
13:15
0.50 INTRM2, WHDBOP CIRC P Drain Stack Flush Choke and Kill lines
with H2O. Via Charging Pump
12,599.0 12,599.0
1/16/2023
13:15
1/16/2023
14:15
1.00 INTRM2, WHDBOP RURD P RIH Set Test Plug, Test plug leaked by
Seal
12,599.0 12,599.0
1/16/2023
14:15
1/16/2023
15:30
1.25 INTRM2, WHDBOP RURD T Pull Test Plug Inspect O-Ring, Cleaned
and Greased Test Plug, RIH Reset Test
Plug
12,599.0 12,599.0
1/16/2023
15:30
1/16/2023
18:00
2.50 INTRM2, WHDBOP BOPE P PJSM Fluid Pack Test Equipment Shell
Test BOPE Stack Test BOPE with %
7/8" Test Jt Test Annular 250 PSI Low
5/Min 2500 PSI High 10/Min Upper
Rams, IBOP, Lower IBOP, Valves 1, 4,
9, 10, 12, 13, 14, 15, 16, HCR Kill,
Manual Kill,250 PSI Low 5/Min 4000PSI
High 10 Min
12,599.0 12,599.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 35/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/16/2023
18:00
1/17/2023
00:00
6.00 INTRM2, WHDBOP BOPE P Cont. Test BOPE as Per SOP and
Regulations, Witnessed By AOGCC Rep
Sully Sullivan All Test Charted 5/Min
Low 4000 PSI High 10/Min. With
Exception of Annular 250 PSI low 5/Min
2500 PSI high 10/Min. W/ 5 7/8" Test Jt.
Upper 4 1/2" x 7 5/8" VBR Rams<
Lower 3 1/2" x 6 5/8" VBR Rams, Blind
Rams, Choke Valves # 2, 3, 5, 8, 11 and
Kill #3, HCR Choke, Manual Choke, 5
7/8" and 6 5/8" Dart and TIW valves.
Perform Koomey Drawdown Test
ACC=2900 PSI, Manifold 1480 PSI.
ACC 1650 PSI after all Functions on
Bottles 26 Sec. For 200 PSI. Build W/ 2
Electric Pumps 138 Sec. to Build Fill
System PSI. Pressure up with 2 Electric
Pumps and Air Pumps 14 Sec to close,
Upper Rams 15 sec., Blind /Shear
Rams 17 Sec., Lower Ram 17 sec.,
Choke HCR 2 sec., KIll HCR 2 Sec.,
Test PVT GAin/Loss and Flow Out
Alarms, Test LEL and H2S Alarms all
passed. Nitrogen 10 Bottles Average
=4000 PSI
12,599.0 12,599.0
1/17/2023
00:00
1/17/2023
03:00
3.00 INTRM2, WHDBOP BOPE P Cont to test BOPE as Per SOP and
Regulations. AOGCC REP Sully
Sullivan, All Test Charted F/5 Min 250
Low F/10 Min high 4000 psi, With
Exception of Annular 250 Low 5 Min
2500 High 10 Min, With 6 5/8" Test Jt.
Upper 4 1/2" x 7 5/8" VBRS Ram,
Manual Choke, Super Choke 1500 PSi
with Controlled Bleed off.
12,599.0 12,599.0
1/17/2023
03:00
1/17/2023
04:45
1.75 INTRM2, WHDBOP RURD P B/D and R/U Test Equipment B/D 6 5/8"
and 5 7/8" TIW'S and Dart Valve Drain
BOP Stack Pull Test Plug / Test Joint
And 1 Stand of Drill Pipe Clean/Clear
Rig Floor. Mobilize Wear Ring to Rig
Floor
12,599.0 12,599.0
1/17/2023
04:45
1/17/2023
05:30
0.75 INTRM2, WHDBOP WWWH P M/U Cameron Wear Ring RIH and Set
ID=12.45 OD=18.40 Length 49.25"
Verify Wear ring is Set. Run in Lock
Down Screws.
12,599.0 12,599.0
1/17/2023
05:30
1/17/2023
06:00
0.50 INTRM2, WHDBOP RURD P R/D and L/D 6 5/8" Test Jt and Space
Out Pups And Wear Ring Running Tool.
12,599.0 12,599.0
1/17/2023
06:00
1/17/2023
07:00
1.00 INTRM2, WHDBOP RURD P Cont. R/D and L/D 6 5/8" Test Jt and
Space Out Pups And Wear Ring
Running Tool.
12,599.0 12,599.0
1/17/2023
07:00
1/17/2023
08:30
1.50 INTRM2, WHDBOP RURD P R/U For Casing Test Mobilize Bit And
BHA to Rig Floor.
12,599.0 12,599.0
1/17/2023
08:30
1/17/2023
09:00
0.50 INTRM2, WHDBOP CIRC P Purge Kill And Choke Line W/ H2O
From Mud Pump #1 Close Blind Rams.
12,599.0 12,599.0
1/17/2023
09:00
1/17/2023
10:15
1.25 INTRM2, DRILLOUT PRTS P PJSM Test and Chart 13 5/8" casing to
4000 PSI @ 1 BPM Total Volume
Pumped =29.2 BBLS Shut In Kill Line
and Hold For 30/Min.
12,599.0 12,599.0
1/17/2023
10:15
1/17/2023
10:30
0.25 INTRM2, DRILLOUT PRTS P Bleed 29 BBLS Back To Trip Tank. Open
Blind Rams Monitor Well 5/Min: Well
Static
12,599.0 12,599.0
1/17/2023
10:30
1/17/2023
11:30
1.00 INTRM2, DRILLOUT CLEN P Drain Stack/Riser B/D Choke Andf Kill
Line. Fill Stack/Riser W/Drill Out Mud.
Monitor Well Via Trip Tank
12,599.0 12,599.0
1/17/2023
11:30
1/17/2023
12:00
0.50 INTRM2, DRILLOUT OTHR P Open Pipe Handler and Inspect Threads
On Saver Sub. Prep To Changew Out
Wash Pipe and Torque Bearing Retainer
12,599.0 12,599.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 36/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/17/2023
12:00
1/17/2023
14:30
2.50 INTRM2, DRILLOUT OTHR P Change Out Wash Pipe and Torque
Bearing Retainer Plate Bolts.
12,599.0 12,599.0
1/17/2023
14:30
1/17/2023
16:30
2.00 INTRM2, DRILLOUT OTHR P Clean Pipe Handler, Saver Sub and
Grabber Dies. Change Out VX69 Saver
Sub.
12,599.0 12,599.0
1/17/2023
16:30
1/17/2023
18:00
1.50 INTRM2, DRILLOUT OTHR P Change Out Elevators And Move Stands
Of 6 5/8" Drill pipe From ODS To Drillers
Side
12,599.0 12,599.0
1/17/2023
18:00
1/17/2023
18:45
0.75 INTRM2, DRILLOUT BHAH P PJSM Rig Up Rig Floor To Pickup BHA
Prep Slips, Dog Collar, Elevators.
12,599.0 12,599.0
1/17/2023
18:45
1/17/2023
19:00
0.25 INTRM2, DRILLOUT BHAH P P/U 12.25 x 13.5 Interm #3 BHA As Per
SOP /SLB DD Rep. Attempt To Make Up
12.25 Axeblade Bit Rig Tong Wouldn't
Bit On XCel Collar.
12,599.0 12,599.0
1/17/2023
19:00
1/17/2023
20:45
1.75 INTRM2, DRILLOUT BHAH T Change Out Rig Tongs F/ HT160 to
HT100 Rig Tongs, TQ 12.25 Axeblade
53K
12,599.0 12,599.0
1/17/2023
20:45
1/18/2023
00:00
3.25 INTRM2, DRILLOUT BHAH P Cont. M/U 12.25"x 13.5" BHA F/ 27' T/
163' Install 3 Size 10 Nozzles in the XM
Reamer As Per SLB Reamer Rep, Clear
Rig Floor Load Radiation Source.
27.0 163.0
1/18/2023
00:00
1/18/2023
02:30
2.50 INTRM2, DRILLOUT BHAH P Cont. M/U 12.25"x 13.5" BHA F/ 163' To
574' As Per SLB DD. Inspect Well
Commander and GS-5F69 Floats, Drift
Jars to 2.75" Drift Tools Above Well
Commander To 2.5" P/U 133K S/O
133K
163.0 574.0
1/18/2023
02:30
1/18/2023
03:00
0.50 INTRM2, DRILLOUT CLEN P Clean And Clear Rig Floor. R/U To
Single In From Pipe Shed
574.0 574.0
1/18/2023
03:00
1/18/2023
05:30
2.50 INTRM2, DRILLOUT TRIP P TIH F/ 574" to 1505' MD W/ 5 7/8" Drill
Pipe Singling in From Pipe Shed. P/U
138 K S/O 138 K. Monitoring well
Via Trip Tank
574.0 1,505.0
1/18/2023
05:30
1/18/2023
06:00
0.50 INTRM2, DRILLOUT CIRC P @ 1505' MD Shallow Hole Test MWD
Tools @ 670 GPM 1001 PSI: Good Test
1,505.0 1,505.0
1/18/2023
06:00
1/18/2023
06:30
0.50 INTRM2, DRILLOUT RURD P Remove X/O from Top-Drive, Blow
Down Top Drive
1,505.0 1,505.0
1/18/2023
06:30
1/18/2023
09:15
2.75 INTRM2, DRILLOUT TRIP P TIH F/ 1505' to 2799' MD, W/ 5 7/8"
Drill Pipe Singling in From Pipe Shed.
P/U 184 K S/O 181 K. Monitoring well
Via Trip Tank
1,505.0 2,799.0
1/18/2023
09:15
1/18/2023
10:00
0.75 INTRM2, DRILLOUT CIRC P @ 2799' MD Shallow Hole Test MWD
Tools @ 680 GPM 1090 PSI: Good
Test
2,799.0 2,799.0
1/18/2023
10:00
1/18/2023
10:30
0.50 INTRM2, DRILLOUT RURD P Remove X/O from Top-Drive, Blow
Down Top Drive
2,799.0 2,799.0
1/18/2023
10:30
1/18/2023
12:00
1.50 INTRM2, DRILLOUT TRIP P TIH F/ 2799' to 3760' MD, W/ 5 7/8"
Drill Pipe Singling in From Pipe Shed.
P/U 188 K S/O 170K. Monitoring well
Via Trip Tank
2,799.0 3,760.0
1/18/2023
12:00
1/18/2023
13:30
1.50 INTRM2, DRILLOUT TRIP P TIH F/ 3760' to 4662' MD, W/ 5 7/8"
Drill Pipe Singling in From Pipe Shed.
P/U 195K S/O 160K. Monitoring well
Via Trip Tank
3,760.0 4,662.0
1/18/2023
13:30
1/18/2023
14:00
0.50 INTRM2, DRILLOUT CIRC P Fill Drill Pipe Every 1000' Blow Down
Top Drive.
4,662.0 4,662.0
1/18/2023
14:00
1/18/2023
15:45
1.75 INTRM2, DRILLOUT TRIP P TIH F/ 4662' to 6060' MD, W/ 5 7/8"
Drill Pipe Singling in From Pipe Shed.
P/U 207K S/O 147K. Monitoring well
Via Trip Tank
4,662.0 6,060.0
1/18/2023
15:45
1/18/2023
16:15
0.50 INTRM2, DRILLOUT CIRC P Fill Drill Pipe Every 1000' Blow Down
Top Drive.
6,060.0 6,060.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 37/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/18/2023
16:15
1/18/2023
17:30
1.25 INTRM2, DRILLOUT TRIP P TIH F/ 6060' to 6986' MD, W/ 5 7/8"
Drill Pipe Singling in From Pipe Shed.
P/U 220K S/O 145K. Monitoring well
Via Trip Tank
6,060.0 6,986.0
1/18/2023
17:30
1/18/2023
18:00
0.50 INTRM2, DRILLOUT CIRC P Fill Drill Pipe Every 1000' Blow Down
Top Drive.
6,986.0 6,986.0
1/18/2023
18:00
1/18/2023
19:00
1.00 INTRM2, DRILLOUT TRIP P TIH F/ 6986' to 7986 MD, W/ 5 7/8" Drill
Pipe Singling in From Pipe Shed. P/U
225K S/O 140K. Monitoring well Via
Trip Tank
6,986.0 7,986.0
1/18/2023
19:00
1/18/2023
19:15
0.25 INTRM2, DRILLOUT CIRC P Fill Drill Pipe Every 1000' Blow Down
Top Drive.
7,986.0 7,986.0
1/18/2023
19:15
1/18/2023
20:15
1.00 INTRM2, DRILLOUT TRIP P TIH F/7986 to 8986' MD, W/ 5 7/8" Drill
Pipe Singling in From Pipe Shed. P/U
231K S/O 138K. Monitoring well Via
Trip Tank
7,986.0 8,986.0
1/18/2023
20:15
1/18/2023
20:30
0.25 INTRM2, DRILLOUT CIRC P Fill Drill Pipe Every 1000' Blow Down
Top Drive.
8,986.0 8,986.0
1/18/2023
20:30
1/18/2023
21:30
1.00 INTRM2, DRILLOUT TRIP P TIH F/ 8986' to 9986' MD, W/ 5 7/8"
Drill Pipe Singling in From Pipe Shed.
P/U 242K S/O 130K. Monitoring well
Via Trip Tank
8,986.0 9,986.0
1/18/2023
21:30
1/18/2023
21:45
0.25 INTRM2, DRILLOUT CIRC P Fill Drill Pipe Every 1000' Blow Down
Top Drive.
9,986.0 9,986.0
1/18/2023
21:45
1/18/2023
22:45
1.00 INTRM2, DRILLOUT TRIP P TIH F/ 9986' to 10985' MD, W/ 5 7/8"
Drill Pipe Singling in From Pipe Shed.
P/U 260K S/O 128K. Monitoring well
Via Trip Tank
9,986.0 10,985.0
1/18/2023
22:45
1/18/2023
23:00
0.25 INTRM2, DRILLOUT CIRC P Fill Drill Pipe Every 1000' Blow Down
Top Drive.
10,986.0 10,985.0
1/18/2023
23:00
1/19/2023
00:00
1.00 INTRM2, DRILLOUT TRIP P TIH F/10985'to 10766' MD, W/ 5 7/8"
Drill Pipe Singling in From Pipe Shed.
P/U 270K S/O 125K. Monitoring well
Via Trip Tank
10,985.0 10,766.0
1/19/2023
00:00
1/19/2023
02:15
2.25 INTRM2, DRILLOUT TRIP P TIH F/10766' to 11599' MD, W/ 5 7/8"
Drill Pipe Singling in From Pipe Shed.
P/U 290K S/O 120K. Monitoring well
Via Trip Tank
10,766.0 11,599.0
1/19/2023
02:15
1/19/2023
02:30
0.25 INTRM2, DRILLOUT CIRC P Fill Drill Pipe Every 1000' Blow Down
Top Drive.
11,599.0 11,599.0
1/19/2023
02:30
1/19/2023
06:30
4.00 INTRM2, DRILLOUT SLPC P R/U Slip and Cut Drill 42', 4.2 Wraps,
Perform Derrick Inspection. Reset
Block Height Limits
11,599.0 11,599.0
1/19/2023
06:30
1/19/2023
08:00
1.50 INTRM2, DRILLOUT RURD P Clean And Clear PS-21 Slips. Install
Master Bushing. Change Out Elevators.
Clean Clear Rig Floor. Mobilize 6 5/8"
Thread Protectors
11,599.0 11,599.0
1/19/2023
08:00
1/19/2023
10:00
2.00 INTRM2, DRILLOUT PULD P L/D 7 Stands 6 5/8" Drill Pipe From
Derrick.
Via Mouse Hole.
11,599.0 11,599.0
1/19/2023
10:00
1/19/2023
10:15
0.25 INTRM2, DRILLOUT TRIP P M/U X/O F 5 7/8" x 6 5/8" Drill Pipe 11,599.0 11,602.0
1/19/2023
10:15
1/19/2023
11:30
1.25 INTRM2, DRILLOUT TRIP P TIH F/ 11599' to 12023' MD, W/ 6 5/8"
Drill PipeFrom Derrick. P/U 300K S/O
107 K. Tag up on Cement. Monitoring
well Via Trip Tank
11,602.0 12,023.0
1/19/2023
11:30
1/19/2023
12:00
0.50 INTRM2, DRILLOUT CIRC P M/U Top Drive, Stage Pumps up and
Establish Paramenters @ 680=GPM
1700= PSI 40=RPM 30K=TQ
12,023.0 12,023.0
1/19/2023
12:00
1/19/2023
14:15
2.25 INTRM2, DRILLOUT WASH P Confirm Reamer Is Closed. Wash Down
F/ 12023' T/ 12464' RPM = 70-100, TQ=
20-37K, Tag Float @ 12464' MD
12,023.0 12,464.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 38/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/19/2023
14:15
1/19/2023
16:15
2.00 INTRM2, DRILLOUT DRLG P Drill Out Plug/Float Collar F/ 12464' MD
t/ 12470' MD GPM=700 PSI 1700
RPM=70-100 TQ=18-47K RTW= 213K
WOB- 12-18K
12,464.0 12,470.0
1/19/2023
16:15
1/19/2023
18:00
1.75 INTRM2, DRILLOUT DRLG P Drill Cement F/ 12470' MD to 12513'
MD GPM=702 PSI=1700 RPM=100
TQ 25-45K WOB- 16K P/U 305K S/O
125K
12,470.0 12,513.0
1/19/2023
18:00
1/19/2023
19:00
1.00 INTRM2, DRILLOUT DRLG P Drill Cement F/ 12513' MD to 12525'
MD GPM 700 PSI 1700 RPM=100 TQ
25-45K WOB=8-9K P/U 305K S/O
125K RTW=205
12,513.0 12,525.0
1/19/2023
19:00
1/19/2023
20:45
1.75 INTRM2, DRILLOUT CIRC T Lost Prime On Mud Pumps, Blow Down
Charging Pump Lines, While
Reciprocate and Rotate Pipe RPM=20
GPM=100 PSI= 434, Move and Treat
Contaminated Mud Establish Circulation
W/ Charging Pumps
Mud Was thick Due To Cement
Contamination.
12,525.0 12,525.0
1/19/2023
20:45
1/20/2023
00:00
3.25 INTRM2, DRILLOUT DRLG P Drill Cement F/ 12525' MD to 12590'
MD GPM 698 PSI=1675 RPM=80 TQ
20-44K WOB=10K P/U 308K S/O
150K RTW=200
12,525.0 12,590.0
1/20/2023
00:00
1/20/2023
03:00
3.00 INTRM2, DRILLOUT DRLG P Drill 13 5/8" Shoe F/12590' MD to
12593' MD GPM 698PSI=1675
RPM=80 TQ 20-44K WOB=10K P/U
308K S/O 150K RTW=200
12,590.0 12,593.0
1/20/2023
03:00
1/20/2023
04:30
1.50 INTRM2, DRILLOUT DRLG P Rat Hole F/12593' to 12607' MD GPM
698PSI=1675 RPM=80 TQ 20-44K
WOB=10K P/U 308K S/O 150K
RTW=200
12,593.0 12,607.0
1/20/2023
04:30
1/20/2023
05:15
0.75 INTRM2, DRILLOUT DDRL P Drill Interm #3 hole Section F/ 12607' to
12627' New Hole GPM 698PSI=1675
RPM=80 TQ 20-44K WOB=10K P/U
308K S/O 150K RTW=200
Work Through Shoe Three Times
12,607.0 12,627.0
1/20/2023
05:15
1/20/2023
07:45
2.50 INTRM2, DRILLOUT CIRC P Circulate and Condition Mud For FIT.
GPM=697 PSI=1464 RPM=90 P/U 310
S/O 140K RTW= 204. Mud In and Out
10.9 PPG
12,627.0 12,627.0
1/20/2023
07:45
1/20/2023
08:30
0.75 INTRM2, DRILLOUT TRIP P Pull Up and Break Off @12597' MD 2
Jts of 6 5/8" Drill pipe in Mouse Hole.
Monitor Well F/ 5 Min B/D Top-Drive.
R/U 2" Pressure lines and Test
Equipment. Purge Air from Lines.
12,627.0 12,597.0
1/20/2023
08:30
1/20/2023
09:30
1.00 INTRM2, DRILLOUT FIT P Close Annular, Perform FIT @ 4 SPM
20 GPM, Break Over @ 1100 PSi 58
Strokes Pumped Total. Shut In Monitor
Pressure For 10/Min. Bleed 3 BBLS
Back to Trip Tank. FIT EQ- 14.6 PPG
12,597.0 12,597.0
1/20/2023
09:30
1/20/2023
09:45
0.25 INTRM3, DRILL OWFF P Monitor well 15/Min Well Static 12,597.0 12,597.0
1/20/2023
09:45
1/20/2023
10:45
1.00 INTRM3, DRILL RURD P R/D FIT Equipment. B/D Choke and Kill
Line. Make Double Back up to Stump in
Rotary
12,597.0 12,597.0
1/20/2023
10:45
1/20/2023
11:30
0.75 INTRM3, DRILL CIRC P @ 12579' MD Circulate and Condition
Mud and Obtain Parameters @ 140
SPM, 700 GPM, 1440 PSI, 50 RPM 31-
45 TQ, 395K P/U, 107K S/O, 207K
ROT/W
12,597.0 12,579.0
1/20/2023
11:30
1/20/2023
12:00
0.50 INTRM3, DRILL SVRG P Service Rig, B/D Top drive Grease
Wash Pipe.
12,579.0 12,579.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 39/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/20/2023
12:00
1/20/2023
12:15
0.25 INTRM3, DRILL TRIP P POOH on Elevators From 12597' to
12487' MD. Break Out And Drain Drill
Pipe.
12,579.0 12,487.0
1/20/2023
12:15
1/20/2023
14:30
2.25 INTRM3, DRILL MPDA P PJSM Install MPD Bearing As per MPD
Hand. Test MPD Bearing And Chokes
12,487.0 12,487.0
1/20/2023
14:30
1/20/2023
14:45
0.25 INTRM3, DRILL CIRC P Obtain SPR W/ MPD Bearing Installed 12,487.0 12,487.0
1/20/2023
14:45
1/20/2023
15:30
0.75 INTRM3, DRILL REAM P Wash And Ream From 12487' To 12627'
MD @ 50 RPM, 32-42K TQ, 650 GPM,
1460 PSI MPD=200 PSI TRPM=1970
12,487.0 12,627.0
1/20/2023
15:30
1/20/2023
16:30
1.00 INTRM3, DRILL DDRL P Drill 12 1/4" Interm #3 Hole Section F/
12627 tom 12639' WOB 18-20,
GPM=700 PSI= 1677, TQ=21-51K,
ECD=12.2 PPG, P/U 397K, S/O 107K,
RTW=207K MPD= 550PSi
12,627.0 12,639.0
1/20/2023
16:30
1/20/2023
17:30
1.00 INTRM3, DRILL DDRL P P/U working Single F/ Pipe Shed.
Increase Flow Rate T/1000=GPM,
PSI=2860PSI, To Shear XM Reaqmer
Pins. Cont Drill F/ 12639' to 12665' MD
WOB=18-20, GPM=900, PSI=2400,
RPM=80, TQ=22-51K, ECD=12.2 PPG
12,639.0 12,665.0
1/20/2023
17:30
1/20/2023
17:45
0.25 INTRM3, DRILL DHEQ P Pull F/ 12665' To 12655' MD. Index XM
Reamer OPen By Lowering Pump Rate
F/900=GPM 2520= PSI to 350=GPM,
760=PSI,
Increase To 900=GPM, 2320=PSi
TRPM W/ Reamer Close @ 900=GPM
2740 Open @ 900 GPM 2250
12,665.0 12,655.0
1/20/2023
17:45
1/20/2023
18:00
0.25 INTRM3, DRILL REAM P Ream F/ 12655' T/ 12665' MD @ 900-
GPM 2320=PSI, 60=RPM, 30-45K TQ,
2-5K=WOB
12,655.0 12,665.0
1/20/2023
18:00
1/20/2023
19:30
1.50 INTRM3, DRILL DHEQ P Pull Up F/ 12665' To 12645' MD P/U
405K Pull T/ 415K Hold 10K Over Pull
Against 13 5/8" Shoe W/ SLB Reamer
AsPer Reamer Rep.
12,665.0 12,645.0
1/20/2023
19:30
1/20/2023
20:30
1.00 INTRM3, DRILL PULD P @ 12645' MD L/D Working Single P/U
400K.
PJSM On Displacing Well W/11.0 PPG
FWP Mud.
12,645.0 12,645.0
1/20/2023
20:30
1/20/2023
22:15
1.75 INTRM3, DRILL CIRC P @ 12645' MD Pump 60 BBLS (2 PPB
Duo Vis) GPM=175 PSI=625 PSI,
Flow=16%, RPM=15 TQ-41
RTW=198K, Chase W/ 11.0 PPG FWP
@ GPM=900 PSI=2030 F/O= 47, RPM-
80, TQ=44, While Reaming Down F/
12645' to 12665' MD. Maintain
ECD=12.2 PPG. Observe Reduced Off
Bottom TQ F/ 44-14K Once Mud Turn
Corner At Shoe.
12,645.0 12,665.0
1/20/2023
22:15
1/20/2023
23:45
1.50 INTRM3, DRILL CIRC T Pump Cycles X5 w/ No Pressure
Indicators Change For Open And Close
XM reamer As Per SLB Rep.Due to
Power Surge from Rig Causing Mud
Pumps to Shut Down
12,665.0 12,665.0
1/20/2023
23:45
1/21/2023
00:00
0.25 INTRM3, DRILL DDRL P Drill 12 1/4" Interm #3 F/ 12665' to
12672' MD @ 900=GPM PSI=2000
80=RPM W/10-30=TQ 20 WOB
12,665.0 12,672.0
1/21/2023
00:00
1/21/2023
00:15
0.25 INTRM3, DRILL CIRC T Verify XM Reamer Is Indexed Open as
Per SLB DD, Reamer REP Due To
Power Surge On Rig, Causing Mud
Pumps to Shut Down.
12,672.0 12,672.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 40/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/21/2023
00:15
1/21/2023
04:00
3.75 INTRM3, DRILL DDRL P Drill 12 1/4" Interm #3 Hole Section F/
12672' To 12797' MD WOB 20K,
GPM=950 PSI= 2250, TQ=20K,
ECD=12.36 PPG, F/O 48%, P/U 397K,
S/O 107K, RTW=198K MPD= 271 Out
Slips 560 PSI in Slips ADT Hrs= 4.75
Bit/Jars Hrs= 4.75
12,672.0 12,797.0
1/21/2023
04:00
1/21/2023
04:30
0.50 INTRM3, DRILL DHEQ P @ 12794' Collect Parameters GPM=960
PSI-2300, RPM=30, TQ=8-10K P/U
236K S/O=169K ROT=195K Break
Connection and Drop RFID Tags as Per
Weatherford.
12,794.0 12,794.0
1/21/2023
04:30
1/21/2023
05:00
0.50 INTRM3, DRILL DHEQ P Perform 11 Pressure Cycles F/ 750-950
GPM T/ Locate RFID'S W/ Rotation
RPM=30,TQ=9-10K
12,794.0 12,794.0
1/21/2023
05:00
1/21/2023
05:30
0.50 INTRM3, DRILL UREM P Ream Up F 12794' to 12781' MD @
GPM=950 PSI=-2275 RPM=80
TQ=16K, F/O=49% Stop Rotation, P/U
into Shoe 12766' W/ 17K over Pull. T/
Verify RipTide Reamer Open Position.
12,794.0 12,766.0
1/21/2023
05:30
1/21/2023
06:15
0.75 INTRM3, DRILL UREM P Ream Down F/ 12766' to 12797' MD @
GPM=950/1300, PSI 2300/3530
RPM=80 TQ=14K, F/O 47%, @ 12785'
MD Cycle Reamer T/ Verify TRPM &
Pressures as PEr SLB & DD/Reamer
Rep.
12,766.0 12,797.0
1/21/2023
06:15
1/21/2023
12:00
5.75 INTRM3, DRILL DDRL P Drill 12 1/4" Interm #3 Hole Section F/
12797' to 13110' MD 5764' TVD WOB
15-25 K, GPM=250 PSI= 3313,
RPM=140, TQ=23-25K, ECD=12.51
PPG, F/O 48%, P/U 247K, S/O 238K,
RTW=209K MPD= 200 Out Slips 480
PSI in Slips ADT Hrs= 6.35 Bit/Jars
Hrs= 8.52
Total BIT Hrs=8.52
12,797.0 13,110.0
1/21/2023
12:00
1/21/2023
12:15
0.25 INTRM3, DRILL CIRC T Power Surge Power Limit Cycled Mud
Pumps & Indexing Reamer Open. Lower
Flow rate To GPM=380 PSI-858,
Pressure Up To GPM-1240, PSI=2390
To Index Reamer Closed. Verify W/
TRPM, Pressure.
13,110.0 13,110.0
1/21/2023
12:15
1/21/2023
18:00
5.75 INTRM3, DRILL DDRL P Drill 12 1/4"x 13 1/2" Interm #3 Hole
Section F/13110' to 13573' MD 5892'
TVD W/ Rip-Tide Reamer Open, XM
Reamer Closed. WOB 25 K,
GPM=1250 PSI= 3370, RPM=140,
TQ=24-27K, ECD=12.51 PPG, F/O
48%, P/U 237K, S/O 238K, RTW=209K
MPD= 200 Out Slips 480 PSI in Slips
13,110.0 13,573.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 41/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/21/2023
18:00
1/22/2023
00:00
6.00 INTRM3, DRILL DDRL P Drill 12 1/4"x 13 1/2" Interm #3 Hole
Section F/ 13573' To 14041' MD 5976'
TVD W/ Rip-Tide Reamer Open, XM
Reamer Closed. WOB 25-30 K,
GPM=1246 PSI= 3472, RPM=150,
TQ=21-24K, Off Bottom TQ=11-16K,
ECD=12.51 PPG, F/O 48%, P/U 244K,
S/O 183K, RTW=210K MPD= 189 Out
Slips 470 PSI in Slips. Obtain TQ and
Drag Every 3x Stands. SIMOPS Cont.
Processing 9 7/8" Casing Pipe Shed
ADT HRS=3.98 Bit/Jar HRS= 16.50
SPR w/ MPD holding Back PSI
SPR @ 13853' MD 5937' TVD MW
11.0PPG
#1 MP 20 SPM 700/330 30SPM
720/310
#2 MP 20 SPM 710/330 30 SPM
720/310
No Losses F/ Last 24 Hrs
13,573.0 14,041.0
1/22/2023
00:00
1/22/2023
02:45
2.75 INTRM3, DRILL DDRL P Drill 12 1/4"x 13 1/2" Interm #3 Hole
Section F/ 14041'To 14227'MD 6019'
TVD W/ Rip-Tide Reamer Open, XM
Reamer Closed. WOB 25-30 K,
GPM=1246 PSI= 3472, RPM=150,
TQ=21-24K, Off Bottom TQ=11-16K,
ECD=12.51 PPG, F/O 48%, P/U 244K,
S/O 183K, RTW=210K MPD= 189 Out
Slips 470 PSI in Slips. Obtain TQ and
Drag Every 3x Stands.
14,041.0 14,227.0
1/22/2023
02:45
1/22/2023
03:15
0.50 INTRM3, DRILL CIRC P @ 14227'MD 6019' TVD Observe -83
BBLS loss over 20 Min W/ Drilling
Ahead. Verified No Surface Equipment
Leaks, Reduced MPD PSI F/ 170 to 110
PSI and Losses Stopped. Mixing 100
BBLS 45 PPB LCM pill as per LCM
Decision and Use for Back Ground
LCM.
14,227.0 14,227.0
1/22/2023
03:15
1/22/2023
06:00
2.75 INTRM3, DRILL DDRL P Drill 12 1/4"x 13 1/2" Interm #3 Hole
Section F/ 14227' to14503' MD 6048'
TVD W/ Rip-Tide Reamer Open, XM
Reamer Closed. WOB 25-30 K,
GPM=1250 PSI= 3490, RPM=150,
TQ=21-28K, Off Bottom TQ=11-16K,
ECD=12.51 PPG, F/O 48%, P/U 244K,
S/O 183K, RTW=210K MPD= 189 Out
Slips 470 PSI in Slips. Obtain TQ and
Drag Every 3x Stands.
14,227.0 14,503.0
1/22/2023
06:00
1/22/2023
10:30
4.50 INTRM3, DRILL DDRL P Drill 12 1/4"x 13 1/2" Interm #3 Hole
Section F/ 14503' To 14797' MD 6143'
TVD W/ Rip-Tide Reamer Open, XM
Reamer Closed. WOB 30 K,
GPM=1250 PSI= 3415, RPM=150,
TQ=21-28K, Off Bottom TQ=11-16K,
ECD=12.27 PPG, F/O 48%, P/U 244K,
S/O 183K, RTW=210K MPD= 122 Out
Slips 400 PSI in Slips. Obtain TQ and
Drag Every 3x Stands. Encounterede
IntermittentLosses Starting @ 14562'
MD 180-30 BPH
14,503.0 14,797.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 42/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/22/2023
10:30
1/22/2023
11:00
0.50 INTRM3, DRILL CIRC P @ 14797' MD Pump 141 BBLS 45 PPB
LCM @ 40=SPM, 200=GPM,560=PSI.
Once Pill Is Out Of Bit, Increase MPD
Pressure T/12.5 PPG ECD Squeeze
LCM Pill Into Formation. Losses after
Squeezing Pill Went From 180 PPB T/
10-30 BPH
14,797.0 14,797.0
1/22/2023
11:00
1/22/2023
11:15
0.25 INTRM3, DRILL CIRC P XM Reamer Indexed Open While
Pumping LCM Pill. Index XM Reamer
Closed By Lowering Pump Rate T/ 380
GPM Then Uo T/ 1250 GPM. Confirm
Closed W/ Torque, Pump Pressure &
TRPM.
14,797.0 14,797.0
1/22/2023
11:15
1/22/2023
12:00
0.75 INTRM3, DRILL DDRL P Drill 12 1/4"x 13 1/2" Interm #3 Hole
Section F/ 14797' MD to 14876' 6153'
TVD W/ Rip-Tide Reamer Open, XM
Reamer Closed. WOB 30 K,
GPM=1250 PSI= 3415, RPM=150,
TQ=28-30K, Off Bottom TQ=11-16K,
ECD=12.27 PPG, F/O 48%, P/U 275K,
S/O 186K, RTW=200K MPD= 207 Out
Slips 490 PSI in Slips. Obtain TQ and
Drag Every 3x Stands. ADt=7.47 Total
Bit Hrs= 27.73 Total Jar Hrs=27.73
Magnets Last 12 hrs= 5 lbs after
shakers, 10 lbs before shakers 10LBS
Total
Total Losses Last 12 Hrs,=833 BBLS
14,797.0 14,876.0
1/22/2023
12:00
1/22/2023
18:00
6.00 INTRM3, DRILL DDRL P Drill 12 1/4"x 13 1/2" Interm #3 Hole
Section F/ 14876' to 15344' MD 6250'
TVD W/ Rip-Tide Reamer Open, XM
Reamer Closed. WOB 30 K,
GPM=1250 PSI= 3595, RPM=150,
TQ=28-30K, Off Bottom TQ=11-16K,
ECD=12.44 PPG, F/O 48%, P/U 268K,
S/O 190K, RTW=218K MPD= 190 Out
Slips 425 PSI in Slips. Obtain TQ and
Drag Every 3x STands Cont. Encounter
Intermittent Losses 10-30 BPH.
SIMOPS L/D 6 5/8" DP Offline.
14,876.0 15,344.0
1/22/2023
18:00
1/22/2023
20:15
2.25 INTRM3, DRILL DDRL P Drill 12 1/4"x 13 1/2" Interm #3 Hole
Section F/15344' to 15519' MD 6250'
TVD W/ Rip-Tide Reamer Open, XM
Reamer Closed. WOB 30 K,
GPM=1250 PSI= 3595, RPM=150,
TQ=28-30K, Off Bottom TQ=11-16K,
ECD=12.25 PPG, F/O 48%, P/U 276K,
S/O 185K, RTW=220K MPD= 190 Out
Slips 425 PSI in Slips..
15,344.0 15,519.0
1/22/2023
20:15
1/22/2023
21:15
1.00 INTRM3, DRILL CIRC P @ 15490'-15519' MD Oserve 134 BBL
Loss Pump 80 BBL 45 PPB Pill @
GPM=150, PSI=500,F/O 3% Once Pill
Was Out Of Bit, Increase MPD Pressure
T/ 12.3 PPG ECD and Squeeze LCM
into Formation. Index XM Reamer Back
To Close After Pumping Pill.
15,519.0 15,519.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 43/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/22/2023
21:15
1/23/2023
00:00
2.75 INTRM3, DRILL DDRL P Drill 12 1/4"x 13 1/2" Interm #3 Hole
Section F/ 15519' To 15730' MD 6331'
TVD W/ Rip-Tide Reamer Open, XM
Reamer Closed. WOB 28 K,
GPM=1250 PSI= 3340, RPM=150,
TQ=28K, Off Bottom TQ=12K,
ECD=12.32 PPG, F/O 48%, P/U 276K,
S/O 185K, RTW=220K MPD= 178 PSI
Out Slips 400 PSI in Slips..
SPR @ 15713' MD 6323' TVD MW 11.0
PPG @ 23:30
@1 MP 20 SPM 520/320 30 SPM
560/3002
2 MP 30 SPM 520/320 30 SPM
550/320
ADT 3.39 Total Bit Hrs= 31.12Total Jar
Hrs = 31.12
Fluid Losses F/ 24 Hrs=1198 BBLS
Magnet Weight For Each 12 Hrs 12/6.5
Total 24 Hrs 18.5 Hrs
15,519.0 15,730.0
1/23/2023
00:00
1/23/2023
06:00
6.00 INTRM3, DRILL DDRL P Drill 12 1/4"x 13 1/2" Interm #3 Hole
Section F/ 15730' to 16207' MD 6422'
TVD W/ Rip-Tide Reamer Open, XM
Reamer Closed. WOB 28 K,
GPM=1250 PSI= 3340, RPM=150,
TQ=28K, Off Bottom TQ=12K,
ECD=12.32 PPG, F/O 48%, P/U 284K,
S/O 192K, RTW=227K MPD= 178 PSI
Out Slips 400 PSI in Slips..
15,730.0 16,207.0
1/23/2023
06:00
1/23/2023
12:00
6.00 INTRM3, DRILL DDRL P Drill 12 1/4"x 13 1/2" Interm #3 Hole
Section F/ 16207' to 16725' MD 6534'
TVD W/ Rip-Tide Reamer Open, XM
Reamer Closed. WOB 28 K,
GPM=1250 PSI= 3750, RPM=170,
TQ=38K, Off Bottom TQ=12K,
ECD=12.48 PPG, F/O 48%, P/U 298K,
S/O 182K, RTW=229K MPD= 178 PSI
Out Slips 400 PSI in Slips.. TQ and
Drag Values Every 3x Stands
12,207.0 16,725.0
1/23/2023
12:00
1/23/2023
18:00
6.00 INTRM3, DRILL DDRL P Drill 12 1/4"x 13 1/2" Interm #3 Hole
Section F/16725' to 17070' MD 6616'
TVD W/ Rip-Tide Reamer Open, XM
Reamer Closed. WOB 24 K,
GPM=1250 PSI= 3780, RPM=170,
TQ=34K, Off Bottom TQ=12K,
ECD=12.55 PPG, F/O 48%, P/U 325K,
S/O 179K, RTW=232K MPD= 178 PSI
Out Slips 400 PSI in Slips.. TQ and
Drag Values Every 3x Stands Pumped
40 BBL, LCM PIll 45 PPB @ 17015' &
40 BBL low Vis LCM Pill@ 17051'
SIMOPS= L/D 6 5/8" Drill Pipe Offline.
16,725.0 17,070.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 44/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/23/2023
18:00
1/24/2023
00:00
6.00 INTRM3, DRILL DDRL P Drill 12 1/4"x 13 1/2" Interm #3 Hole
Section F/ 17070' to 17576' MD 6711'
TVD W/ Rip-Tide Reamer Open, XM
Reamer Closed. WOB 18 K,
GPM=1250 PSI= 3860, RPM=170,
TQ=32K, Off Bottom TQ=12K,
ECD=12.53 PPG, F/O 48%, P/U 356K,
S/O 184K, RTW=237K MPD= 220 PSI
Out Slips 460 PSI in Slips.. TQ and
Drag Values Every other Stands
SIMOPS= L/D 6 5/8" Drill Pipe Offline.
ADT 7.35, Bit Hrs=46.45, Jar Hrs=
46.45 Total Drill @4 Hrs=15.83
SPR @ 17106' MD 6610' TVD W/11.
PPG
#1 20 SPM 580/360 30 SPM 622/345
#2 20 SPM 580/360 30 SPM 632/345
Magnet Weight 14 LBS
Mud Losses 12Hrs 0 , Losses 24Hrs 111
17,070.0 17,576.0
1/24/2023
00:00
1/24/2023
06:00
6.00 INTRM3, DRILL DDRL P Drill 12 1/4"x 13 1/2" Interm #3 Hole
Section F/ 17576' to 18016' MD 6883'
TVD W/ Rip-Tide Reamer Open, XM
Reamer Closed. WOB 18 K,
GPM=1250 PSI= 3860, RPM=170,
TQ=32K, Off Bottom TQ=12K,
ECD=12.53 PPG, F/O 48%, P/U 356K,
S/O 184K, RTW=237K MPD= 220 PSI
Out Slips 460 PSI in Slips.. TQ and
Drag Values Every other Stands
SIMOPS= L/D 6 5/8" Drill Pipe Offline.
@ 17859' MD Dump 500 BBLS of 11.0
PPG to Tank Farm, Replace With Fresh
11.0 PPG Black Product Treated 11.0
FWP Mud
17,576.0 18,016.0
1/24/2023
06:00
1/24/2023
11:00
5.00 INTRM3, DRILL DDRL P DRILL 12-1/4" X 13-1/2" Interm #3 Hole
W/ Rip-Tide Reamer F/ 18,016‘ MD - T/
18,411‘ MD,
6,883‘ TVD, WOB: 35K, GPM: 1245,
PSI: 4060, RPM: 170, TQ: 43K, ECD:
12.48PPG, PUW: 385K,
SOW: 175K, RTW: 248K. MPD
Pressure 473/203 PSI.
18,016.0 18,411.0
1/24/2023
11:00
1/24/2023
11:15
0.25 INTRM3, DRILL FIT P @ 18,411' MD, Clear Cutting F/ BHA &
Isolate Active T/ Pit #5 For The
Dynamic Fit.
18,411.0 18,411.0
1/24/2023
11:15
1/24/2023
12:00
0.75 INTRM3, DRILL FIT P Perform Dynamic Fit T/ 12.93 PPG ECD
W/ MPD @ 950 GPM, 2720 PSI, 20
RPM, 31K TQ.
18 BBL Total Losses.
ADT F/ Tour 7.83 Hrs Total Bit/Jar Hrs
54.28
18 BBLS Loss For Tour
18,411.0 18,411.0
1/24/2023
12:00
1/24/2023
13:30
1.50 INTRM3, DRILL DDRL P Drill 12-1/4" X 13-1/2" Interm #3 Hole W/
Rip-Tide Reamer F/ 18,411‘ MD - T/
18,458‘ MD,
6893‘ TVD, WOB: 35K, GPM: 1250,
PSI: 4060, RPM: 170, TQ: 43K, ECD:
12.48PPG, PUW: 385K,
SOW: 175K, RTW: 248K. Slow Rop T/
75 FPH While Treating The Mud System
With Black Product For the HRZ.
18,411.0 18,458.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 45/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/24/2023
13:30
1/24/2023
14:30
1.00 INTRM3, DRILL CIRC P @ 18,458' MD Circ & Recip F/ 18,458'
MD T/ 18,440' MD @ 1245 GPM, 4200
PSI, 100 RPM, 37
TQ, MPD = 210PSI, ECD = 12.51. Cont.
Treat Mud System With Black Product
18,458.0 18,458.0
1/24/2023
14:30
1/24/2023
15:30
1.00 INTRM3, DRILL OTHR P @ 18,440' MD, Drop 8 RFID Tags to
Close Rip-Tide Reamer. Pressure cycle
Reamer F/ 1245 GPM & 4180 PSI T/
1050 GPM & 3260 PSI While ROT @ 30
RPM & 36K TQ.
18,440.0 18,440.0
1/24/2023
15:30
1/24/2023
16:30
1.00 INTRM3, DRILL OTHR P Drop 8 More RFID Tags To Close Rip-
Tide Reamer. Pressure Cycle Reamer
F/
1245 GPM & 4180 PSI - T/ 1050 GPM &
3260 PSI While ROT @ 30 RPM & 36K
TQ.
18,440.0 18,440.0
1/24/2023
16:30
1/24/2023
16:45
0.25 INTRM3, DRILL REAM P Ream Down F/ 18,440 MD - T/ 18,458
@ 1250 GPM, 4200 PSI. 100 RPM, 35K
TQ, 12.49 ECD.
18,440.0 18,458.0
1/24/2023
16:45
1/24/2023
17:15
0.50 INTRM3, DRILL DDRL P Drill 12-1/4" Interm #3 Hole W/ Rip-Tide
Reamer Closed F/ 18,458‘ MD - T/
18,468‘ MD,
6898‘ TVD, WOB: 15K, GPM: 1250,
PSI: 4220, RPM: 170, TQ: 44K, ECD:
12.5PPG. Obtain Final
P/U & S/O WT. PUW: 400K, SOW:
170K, RTW: 250K.
18,458.0 18,468.0
1/24/2023
17:15
1/24/2023
17:45
0.50 INTRM3, TRIPCAS BKRM P BROOH F/ 18,468' MD - T/ 18,310' MD
@ 100 RPM, 40K TQ, 1245 GPM, 4225
PSI, MPD = 230
PSI, ECD = 12.5.
18,468.0 18,310.0
1/24/2023
17:45
1/24/2023
18:30
0.75 INTRM3, TRIPCAS OTHR P @ 18,313' MD, 6,859'TVD,Index XM
Reamer, Open GPM:1240, PSI:3930 W/
Good
Pressure Drop Indication, PUW:429K,
SOW:160K, RTW:230K. Slack Off
W/out
Rotary T/ 18,320' Set Down 15K (145K)
Good Verification XM Reamer Is Open &
Rip Tide Reamer Is Closed.
18,310.0 18,310.0
1/24/2023
18:30
1/24/2023
23:30
5.00 INTRM3, TRIPCAS REAM P P/U T/ 18,317' MD, Obtain Parameters,
Ream 12-1/4" Rat Hole T/ 13-1/2: Down
T/ 18,412' W/ XM Reamer Open
RPM=60-100, TQ OFF-45K, TQ ON: 45-
56K, GPM:1240, PSI ON:3903, PSI
OFF:3977, FLOW:41%,
ECD:12.52PPG, MPD IN SLIPS:240
PSI, OUT SLIPS:475PSI.SIMOP'S
Stage / Load Mud Pits, W/ 15.0PPG
FWP Spike Fluid As Per CPAI Mud
Engineer
18,317.0 18,412.0
1/24/2023
23:30
1/25/2023
00:00
0.50 INTRM3, TRIPCAS REAM P P/U T/ 18,407' MD After X7 Attempts T/
Ream Down. Index XM Reamer Closed
To Attempt to Ream Down to Verify
reamer Is Hanging Up in Formation.
Could Not Ream Pass 18,412' W/ XM
Reamer Closed .
ADT F/ Tour = 4.81 HRS Total Bit / Jar
Hrs = 59.09 Hrs
Losses F/ Tour = 0 Losses F/ Last 24
HR = 18 BBLS
Magnet Weight = 9.5 Before Shakers
12 After Shakers. Total = 21.5 LBS
18,412.0 18,407.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 46/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/25/2023
00:00
1/25/2023
01:00
1.00 INTRM3, TRIPCAS BKRM P BROOH w/ XM Reamer Closed F/
18412' MD to 18343' W/ GPM-1240,
PSI=4130, RPM=100, TQ=48-57K F/O
41% ECD=12.53 PPG Weight up using
15.0PPG Spike Fluid a Per SLB Mud
Engineer, P/U=429K S/o=160K,
RTW=238K MaintAIN 12.5 ppg ECD W/
MPD
18,412.0 18,343.0
1/25/2023
01:00
1/25/2023
02:15
1.25 INTRM3, TRIPCAS BKRM P @ 18343' MD 6869' TVD Work Pipe w/
25-30K Overpull, RTW 237K
GPM=1240, PSI=4130, F/O 41%, TQ 48
-60K, (No Sign of Packoffs)
18,343.0 18,343.0
1/25/2023
02:15
1/25/2023
02:30
0.25 INTRM3, TRIPCAS BKRM P BROOH w/ XM Reamer Closed F/
18343' MD to 18222' W/ GPM-1240,
PSI=4130, RPM=100, TQ=48-57K F/O
41% ECD=12.53 PPG Weight up using
15.0PPG Spike Fluid a Per SLB Mud
Engineer, P/U=429K S/o=160K,
RTW=238K Maintain 12.5 ppg ECD W/
MPD
18,343.0 18,222.0
1/25/2023
02:30
1/25/2023
02:45
0.25 INTRM3, TRIPCAS OTHR P @ 18222' MD Index XM Reamer Open
@ GPM=405, PSI=915, W/ Good
Indication Of Reamer Open As Per SLM
Reamer Rep.
18,222.0 18,222.0
1/25/2023
02:45
1/25/2023
06:00
3.25 INTRM3, TRIPCAS REAM P Ream Down w/ XM Reamer Open F/
18222' MD to 18468' W/ GPM-1240,
PSI=4130, RPM=100, TQ=48-57K F/O
41% ECD=12.53 PPG Weight up using
15.0PPG Spike Fluid a Per SLB Mud
Engineer, P/U=429K S/o=160K,
RTW=238K Maintain12.5 ppg ECD W/
MPD, P/U 5 7/8" Offline from Pipe Shed
and Rack Back in Derrick
18,222.0 18,468.0
1/25/2023
06:00
1/25/2023
06:15
0.25 INTRM3, TRIPCAS OWFF P @ 18467' MD Index XM Reamer Closed
By Lowering Flow Rate T/ GPM=407,
PSI=882, Then T/GPM=1240 PSI=4272.
Confirm Reamer Is Closed With PSi
increase and TRPM Increase
18,468.0 18,467.0
1/25/2023
06:15
1/25/2023
08:15
2.00 INTRM3, TRIPCAS BKRM P Grease Wash Pipe, BROOH F/ 18467'
to 18222' MD @ RPM=30, TQ=39K,
GPM=1240 PSI=4270. FPM=3.5
BROOH W/ RTW 235K
18,467.0 18,222.0
1/25/2023
08:15
1/25/2023
10:30
2.25 INTRM3, TRIPCAS BKRM P BROOH F/ 18222' to 17850' MD
RPM=125, TQ=46, GPM=1240,
PSI=4200, 8 fpm BROOH, RTW=230K,
ECD=12.61, MPD=100 PSI
18,222.0 17,850.0
1/25/2023
10:30
1/25/2023
11:15
0.75 INTRM3, TRIPCAS OWFF P @ 17850' MD B/D Top-Drive Monitor
Well F/ 30 Min Through MPD, While
Rotating RPM=30 TQ=36 ( Well Static)
Index Reamer to Closed, Reamer Was
Opened F/ Bleed Off at MPD.
17,850.0 17,850.0
1/25/2023
11:15
1/25/2023
12:00
0.75 INTRM3, TRIPCAS BKRM P BROOH F/ 17850' to 17690 MD
RPM=150, TQ=46, GPM=1240,
PSI=4250, 8 fpm BROOH, RTW=230K,
ECD=12.75, MPD=73 PSI
Magnets=Flowline 3 lbs, Shakers 8 lbs
17,850.0 17,690.0
1/25/2023
12:00
1/25/2023
14:30
2.50 INTRM3, TRIPCAS BKRM P BROOH F/17690' To 17278' MD
RPM=150, TQ=46, GPM=1240,
PSI=4250, 8 fpm BROOH, RTW=230K,
ECD=12.75, MPD=73 PSI
Encountered 150PSi Pressure Increase
& 8K increase In TQ @ 17401' MD
17,690.0 17,278.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 47/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/25/2023
14:30
1/25/2023
16:00
1.50 INTRM3, TRIPCAS CIRC P Circulate B/U and Work Pipe F/ 17278'
To 17203' MD, RPM=150 TQ=55K
GPM=1240, PSI=4160, ECD=12.81,
MPD=101 PSI
17,278.0 17,203.0
1/25/2023
16:00
1/25/2023
18:00
2.00 INTRM3, TRIPCAS BKRM P BROOH F/17203' to 16915' MD
RPM=150, TQ=46, GPM=1240,
PSI=4250, 3 fpm BROOH, RTW=220K,
ECD=12.81, MPD=101 PSI
17,203.0 16,915.0
1/25/2023
18:00
1/26/2023
00:00
6.00 INTRM3, TRIPCAS BKRM P BROOH F/16915' to 16267' MD
RPM=150, TQ=46, GPM=1240,
PSI=4150, 3 fpm BROOH, RTW=227K,
ECD=12.85, MPD=101 PSI
@ 16827' MD 6556' TVD Collected
TQ/Drag For Up Coming Liner Run.
P/U=444 S/O=138 RTW=235K
TQ=52/35
Magnet Weight F/ Tour 8 LBS
Total Losses F/ 24 Hrs to Formation 0
BBLS
16,915.0 16,267.0
1/26/2023
00:00
1/26/2023
01:15
1.25 INTRM3, TRIPCAS CIRC P Circulate B/U and Work Pipe F/ 16267'
to 16174' MD, RPM=150 TQ=42-46K
GPM=1240, PSI=4180, ECD=12.66,
MPD=101 PSI
16,267.0 16,174.0
1/26/2023
01:15
1/26/2023
06:00
4.75 INTRM3, TRIPCAS BKRM P BROOH F/16174' to 15565' MD
RPM=150, TQ=46, GPM=1240,
PSI=4150, 3 fpm BROOH, RTW=227K,
ECD=12.66, MPD=101 PSI
Start 800 bbl Dump and Dilution In Pits
@ 0430 Hrs
XM Reamer indexed open @
16734',16360',16081',15988', After
Connections. Indexed Back To Closed
each time.
SIMOP= P/U 17 Stands 5 7/8" Drill Pipe
Rack Back In Derrick.
16,174.0 15,565.0
1/26/2023
06:00
1/26/2023
12:00
6.00 INTRM3, TRIPCAS BKRM P Cont. BROOH F/ 15565' to 14650' MD
GPM=1240, PSI=4050, RPM=130,
TQ=38-45, ECD=12.69, MPD=88/360
PSI RTW=230K Obtain Torque And
Drag Values @ 15448' MD P/U=380K,
S/O=151K RTW=235K
15,565.0 14,650.0
1/26/2023
12:00
1/26/2023
16:00
4.00 INTRM3, TRIPCAS BKRM P Cont. BROOH F/14650' to 14007' MD
GPM=1240, PSI=4050, RPM=130,
TQ=38-45, ECD=12.69, MPD=88/360
PSI P/U=380K, S/O=151K RTW=238K
14,650.0 14,007.0
1/26/2023
16:00
1/26/2023
17:15
1.25 INTRM3, TRIPCAS CIRC P @ 14007' MD Circulate B/U and Work
Pipe Up T/13944' MD @ GPM=1250,
PSI=4126, RPM=130TQ=35
14,007.0 13,944.0
1/26/2023
17:15
1/26/2023
18:30
1.25 INTRM3, TRIPCAS BKRM P Cont. BROOH F/13944' to 13698' MD
GPM=1240, PSI=4050, RPM=130,
TQ=38-45, ECD=12.69, MPD=88/360
PSI P/U=380K, S/O=151K RTW=210K
13,944.0 13,698.0
1/26/2023
18:30
1/26/2023
18:45
0.25 INTRM3, TRIPCAS CIRC P @ 13698' MD Encounter Flow
Restrictions W/ 100 PSI Increase F/
4100 psi to 4200 PSI @ GPM=1250.
Lowered Flow Rate To GPM=1000,
PSI= 3200 Lowered String 12' top
13674' MD. Then We had Complete
Losses.
13,698.0 13,674.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 48/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/26/2023
18:45
1/26/2023
21:00
2.25 INTRM3, TRIPCAS CIRC T Pump 40 BBLS LCM Pill @ GPM-400
PSI=718, & Work Pipe Up T/ 13665' at
RPM=20 TQ=20K RTW=210 W/ No
Returns, Ream Pipe Down to 13758' W/
Partial Return, Shut Down Pumping.
B/D Top-Drive While Making Call To
supervisor's
13,674.0 13,758.0
1/26/2023
21:00
1/26/2023
23:00
2.00 INTRM3, TRIPCAS STRP T Strip In Hole on Elevators W/ MPD F/
13758' To 14875' MD P/U=305,
S/O=165K, MPD=170 PSI In Slips=91
PSi ECD=12.0
13,758.0 14,875.0
1/26/2023
23:00
1/27/2023
00:00
1.00 INTRM3, TRIPCAS CIRC T @ 14879' to 14786' MD Work Pipe W/
No Rotation While Pumping 150 BBL 45
PPB LCM Pill, Stage Flow Rate While
Monitoring losses F/ GPM=125-300,
PSI=624,F/O 2%-13% SIMOPS - Fill
pits with 11.5PPG FWP From Tank
Farm.
Losses for the Last 24 Hrs 1286 BBLS
14,875.0 14,786.0
1/27/2023
00:00
1/27/2023
01:30
1.50 INTRM3, TRIPCAS CIRC T @14879'-14786' MD Work Pipe W/ No
Rotation, Cont. T/ Monitor Losses With
Flow Rate GPM=300 PSI=624 Flow 2%
to 13% P/U=305 S/O 165K Squeezed
77 BBls LCM W/ MPD @ Est. 12.2
PPG Fill Pits W/ 11.5 PPG FWP From
Tank Farm
14,786.0 14,876.0
1/27/2023
01:30
1/27/2023
03:30
2.00 INTRM3, TRIPCAS STRP T @ 14875' MD B/D Top-Drive, Strip In
Hole W/ MPD=170 PSI, To 15621' MD
P/U=305, S/O=90 String Speed 720
FPH
14,876.0 15,621.0
1/27/2023
03:30
1/27/2023
05:45
2.25 INTRM3, TRIPCAS CIRC T @ 15621'MD Pump 150 BBLS 45 PPB
LCM Pill @ GPM=175 PSI=420
Squeeze LCM into Formation W/ MPD
Squeezed in 110 BBLS
15,621.0 15,621.0
1/27/2023
05:45
1/27/2023
09:00
3.25 INTRM3, TRIPCAS CIRC T @15,621 MD Stage up the flow rate
from 50gpm to 1,200gpm.
GPM=1,000 PSI=2,880
ROT=50rpm
12.3ppge observed losses at 1,200gpm
12.24ppge no losses observed
1,150gpm
15,621.0 15,621.0
1/27/2023
09:00
1/27/2023
11:00
2.00 INTRM3, TRIPCAS CIRC T Circulate Bottoms up.
Large amount of LCM material over
shakers.
GPM=1,000 PSI=2,885
ROT=50rpm
Tq=30k/lbs
No Losses
15,621.0 15,621.0
1/27/2023
11:00
1/27/2023
13:30
2.50 INTRM3, TRIPCAS CIRC T Pump 147bbls of 45ppb LCM Pill.
Chase at 1,000gpm for 3,200stks. Slow
to 600gpm for Directional Tools. Chase
pill for total 3,595stks to spot above
potential loss zone at 15,410'.
Shut down and apply MPD pressure
staging up from 210psi to 360psi in
30psi increments. Squeezed total of
147bbls away.
15,621.0 15,621.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 49/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/27/2023
13:30
1/27/2023
18:00
4.50 INTRM3, TRIPCAS CIRC T CBU 15,621' to 15,718'
Checking for potential LCM
bridge/obstruction and clearing well bore
of remaining LCM. Work rate and back
pressure up to check for losses.
12.33ppge no losses 1,000gpm 53psi
MPD back pressure.
12.5ppge 60bph losses at 1,100gpm
110psi MPD back pressure
ROT=50
TQ=35k
15,621.0 15,718.0
1/27/2023
18:00
1/27/2023
21:00
3.00 INTRM3, TRIPCAS CIRC T Pump 147bbls of 45 ppb LCM Pill.
Chase with 800 GPM @ 3200 STKS
Slow to 600 GPM for Dierectional Tools
Chase Pill W/ 3595 STKS to spot over
Loss Zone,
Increase MPD pressure to 220 PSI=
12.44 PPGE.
Start pumping into Loss zone.
12.44 PPGE 800 GPM 200=MPH 45
BPH Losses
12.32 PPGE 800 GPM 150= MPD 5
BPH Losses
12.32 PPGE 1000 GPM 118= MPD 5
BPH Losses
ROT=30
TQ=35k
15,621.0 15,718.0
1/27/2023
21:00
1/28/2023
00:00
3.00 INTRM3, TRIPCAS BKRM T BROOH / 15718' to 15344' MD
GPM=955 PSI=2550, F/O 32% RPM=50
-70, TQ=29-35K ECD-12.11 MPD=68
PSI RTW=218K, SIMOPS, Build 150
BBLS 45 PPB LCM Pill
Monitoring Losses VIA Gain/Loss
Note: #2 Mud Lost it Bus Board that
Sync Pumps and Charging pumps
together. Electrician came out to rig
Changed Bus board out. Pumping at
955 GPM
15,718.0 15,344.0
1/28/2023
00:00
1/28/2023
06:00
6.00 INTRM3, TRIPCAS BKRM T BROOH / 15344' to 14450' MD
GPM=955/1000 PSI=2550/3000, F/O
32% RPM=50-70, TQ=29-35K ECD-
12.11 MPD=68 PSI RTW=218K,
SIMOPS, Build 150 BBLS 45 PPB LCM
Pill
Monitoring Losses VIA Gain/Loss
Note: Cont. #2 Mud Lost it Bus Board
that Sync Pumps and Charging pumps
together. While Electrician Changed
Bus board out. Pumping at 955 GPM
BROOH. #2 Pump Back online at
03:30hrs. Stage pumps up to 1000
GPM.
15,344.0 14,450.0
1/28/2023
06:00
1/28/2023
12:00
6.00 INTRM3, TRIPCAS BKRM P BROOH /14450' to13561' MD
GPM=1000 PSI=2571, F/O 35%
RPM=100, TQ=36K MPD=32 PSI
RTW=218K, MPD maintain 12.16 ECD
Begin 800 BBL Dump and Dilute
Monitoring Losses VIA Gain/Loss
14,450.0 13,561.0
1/28/2023
12:00
1/28/2023
18:00
6.00 INTRM3, TRIPCAS BKRM P BROOH /13561' to 13388' MD
GPM=1000 PSI=2568, F/O 35%
RPM=100, TQ=31K MPD=32 PSI
RTW=205K, MPD maintain 12.16 ECD
Monitoring Losses VIA Gain/Loss
13,561.0 13,388.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 50/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/28/2023
18:00
1/29/2023
00:00
6.00 INTRM3, TRIPCAS BKRM P BROOH /13388' to 13205' MD
GPM=1000 PSI=2568, F/O 35%
RPM=100, TQ=30-44K MPD=32 PSI
RTW=205K, MPD maintain 12.18 ECD
Monitoring Losses VIA Gain/Loss
Magnet Weight F/ 24 Hours 10 lbs
Total Losses T/ Formation 24 Hours 132
BBLS
13,388.0 13,205.0
1/29/2023
00:00
1/29/2023
06:00
6.00 INTRM3, TRIPCAS BKRM P BROOH / 13205' to13100' MD
GPM=1000 PSI=2568, F/O 35%
RPM=100, TQ=30-44K MPD=32 PSI
RTW=205K, MPD maintain 12.18 ECD
Monitoring Losses VIA Gain/Loss
13,205.0 13,100.0
1/29/2023
06:00
1/29/2023
10:00
4.00 INTRM3, TRIPCAS BKRM P BROOH /13100' to 12543' MD
GPM=1000 PSI=2565, F/O 35%
RPM=100, TQ=20-24K MPD=32 PSI
RTW=203K, MPD maintain 12.10 ECD
Slow To RPM=40 GPM 400 While
Pulling onto Shoe.
Monitoring Losses VIA Gain/Loss
13,100.0 12,543.0
1/29/2023
10:00
1/29/2023
14:00
4.00 INTRM3, TRIPCAS CIRC P Circulate/Recip F/ 12543' to 12587'
GPM=125 PSI=3747, RPM=130,
TQ=23K, F/O 39%, ECD=12.20. Pump
150 BBL Nut Plug Sweep, Circulate until
Shaker are Clean, 6700 total Strokes
Pumped
12,543.0 12,587.0
1/29/2023
14:00
1/29/2023
14:30
0.50 INTRM3, TRIPCAS OWFF P OWFF, Blow Down Top-Drive 12,587.0 12,587.0
1/29/2023
14:30
1/29/2023
16:15
1.75 INTRM3, TRIPCAS SMPD P SOOH f/ 12587' to 11645' MD P/U
232K, S/O 175K, MPD Hold 260 psi
12,587.0 11,645.0
1/29/2023
16:15
1/29/2023
18:00
1.75 INTRM3, TRIPCAS MPDA P PJSM Remove 6 5/8" MPD Bearing and
Bearing as Per SOP
11,645.0 11,645.0
1/29/2023
18:00
1/30/2023
00:00
6.00 INTRM3, TRIPCAS SMPD P SOOH W/ 5 7/8" Drill Pipe Back in
Derrick F/ 11645' to 7906' MD P/U=215
S/O=153, Monitor Displacement Via
Isolated Pit #5
MPD Holding 360 PSI, Drop 3.5" Rabbit
W/ 100' wire tail.
11,645.0 7,906.0
1/30/2023
00:00
1/30/2023
06:00
6.00 INTRM3, TRIPCAS SMPD P SOOH racking back 5 7/8" DP f/7,906'
to 624'. Maintain 12.2 ppg EMW.
Monitor hole fill via pit #5.
7,906.0 624.0
1/30/2023
06:00
1/30/2023
06:15
0.25 INTRM3, TRIPCAS OWFF P OWFF 15 min (static) 624.0 624.0
1/30/2023
06:15
1/30/2023
06:30
0.25 INTRM3, TRIPCAS MPDA P Pull 5-7/8" RCD bearing and rack back
on stand in derrick.
624.0 624.0
1/30/2023
06:30
1/30/2023
13:00
6.50 INTRM3, TRIPCAS BHAH P Cont. to POOH while L/D BHA. Bit
Grade: 3-2-BT-A-X-2-LT-TD, XM
Reamer: 1-1-WT-A-X-I-NO-TD, RipTide
Reamer: 1-2-WT-G-X-I-NO-TD. Clean
and clear floor of BHA tools and
equipment.
WFT RipTide Reamer had 2 Retainer
pins missing for hinge pins. 1 was
recovered on top of the cutter block void
packed in clay. 2nd one was not found
and presumed in the hole. (1.2" OD /
1.93" Long)
624.0 0.0
1/30/2023
13:00
1/30/2023
13:45
0.75 INTRM3, TRIPCAS WWWH P M/U stack washer and flush BOPE
stack.
0.0 0.0
1/30/2023
13:45
1/30/2023
16:00
2.25 INTRM3, CASING RURD P C/O upper pipe rams to 9-7/8" full body.
SIMOPS - C/O saver sub to VX-57 and
replace IBOP actuator on top drive.
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 51/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
1/30/2023
16:00
1/30/2023
17:15
1.25 INTRM3, CASING RURD P M/U wear ring running tool on 9-7/8" test
joint and pull wear ring. M/U test plug
and set same. R/U to test BOPE's.
Flood lines and purge air from system.
0.0 0.0
1/30/2023
17:15
1/30/2023
17:45
0.50 INTRM3, CASING BOPE P Test upper rams w/9-7/8" test joint 250
psi 5 min / 4000 psi 10 min.
0.0 0.0
1/30/2023
17:45
1/30/2023
19:30
1.75 INTRM3, CASING RURD P R/D testing equipment and blow down
lines. Remove test plug and set 12.43"
ID wear ring.
0.0 0.0
1/30/2023
19:30
1/30/2023
22:00
2.50 INTRM3, CASING RURD P Stage 9-7/8" liner running tools and
equipment at bottom of beaver slide.
Clean and clear rig floor. SIMOPS - C/O
air boot on bell nipple.
0.0 0.0
1/30/2023
22:00
1/31/2023
00:00
2.00 INTRM3, CASING RURD P Mobilize Volant, bale extensions, slips,
PS-21 inserts to rig floor.
0.0 0.0
1/31/2023
00:00
1/31/2023
01:30
1.50 INTRM3, CASING RURD P Rig up to run 9-7/8" liner. SIMOPS -
Stage casing RCD bearing and stabbing
stand on rig floor.
0.0 0.0
1/31/2023
01:30
1/31/2023
03:30
2.00 INTRM3, CASING MPDA P M/U 9-7/8" casing RCD bearing to joint
#16 and perform dummy run. (good).
L/D joint w/bearing installed to pipe
shed.
0.0 0.0
1/31/2023
03:30
1/31/2023
06:00
2.50 INTRM3, CASING PUTB P PJSM on running liner. M/U 9-7/8" 62.8#
L-80 Hyd 563 liner shoe track to 160'.
Baker lock to pin of joint #4. Fill pipe and
check floats (good)
0.0 160.0
1/31/2023
06:00
1/31/2023
08:00
2.00 INTRM3, CASING PUTB P RIH 9-7/8" 62.8# L-80 Hyd 563 liner
f/160' to 623'. S/O wt 96k
160.0 623.0
1/31/2023
08:00
1/31/2023
08:30
0.50 INTRM3, CASING MPDA P M/U 9-7/8" RCD bearing and function
test equipment.
623.0 623.0
1/31/2023
08:30
1/31/2023
17:30
9.00 INTRM3, CASING PUTB P RIH 9-7/8" 62.8# L-80 Hyd 563 liner
f/623' to 6,003' while maintaining 12.2
ppg EMW. S/O wt 115k
623.0 6,003.0
1/31/2023
17:30
1/31/2023
18:00
0.50 INTRM3, CASING MPDA P R/D liner running tools and equipment.
Volant, PS-21's, bale extensions, etc.
Prep to pull 9-7/8" RCD bearing.
6,003.0 6,003.0
1/31/2023
18:00
1/31/2023
18:15
0.25 INTRM3, CASING OWFF P OWFF 15 min (static) 6,003.0 6,003.0
1/31/2023
18:15
1/31/2023
19:45
1.50 INTRM3, CASING RURD P Clean and clear floor of liner running
tools and equipment. R/U 5-7/8"
handling equipment. Cont. to prep to
pull 9-7/8" RCD bearing. Monitor well by
circulating across the top of the hole
thru MPD system.
6,003.0 6,003.0
1/31/2023
19:45
1/31/2023
22:00
2.25 INTRM3, CASING MPDA P Mobilize power tongs to rig floor and
R/U. M/U 9-7/8" circ swedge and 1
stand of 5-7/8" DP. Pull 9-7/8" RCD
bearing and L/D same. Rack back stand
of 5-7/8" DP. Monitor well by circulating
across the top of the hole thru MPD
system. Mud wt out 11.5 ppg
6,003.0 6,003.0
1/31/2023
22:00
2/1/2023
00:00
2.00 INTRM3, CASING RURD P R/U liner hanger shuttle. P/U 9-7/8" x 13
-5/8" ZXP liner hanger packer assy. R/D
liner hanger shuttle.
6,003.0 6,003.0
2/1/2023
00:00
2/1/2023
02:30
2.50 INTRM3, CASING PUTB P M/U liner wiper plugs to 9-7/8" x 13-5/8"
ZXP liner hanger packer assy. M/U liner
hanger to liner. Inspect hanger slips and
verify pinned correctly. Fill liner hanger
with pal mix. RIH to 6,055'. Mud wt out
11.5 ppg
6,003.0 6,055.0
2/1/2023
02:30
2/1/2023
02:45
0.25 INTRM3, CASING RUNL P RIH with liner on two stands of 5-7/8"
drill pipe f/6,055' to 6,240'
6,055.0 6,240.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 52/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/1/2023
02:45
2/1/2023
04:15
1.50 INTRM3, CASING MPDA P Install 5-7/8" RCD bearing and line up
MPD equipment to strip liner in the hole.
Collect torque and drag data, P/U wt
167 k, S/O wt 130 k, ROT wt 154 k, 20
rpm @ 8 k/ft lbs trq.
6,240.0 6,240.0
2/1/2023
04:15
2/1/2023
14:00
9.75 INTRM3, CASING RUNL P RIH with liner 9-7/8" liner with 5-7/8" drill
pipe f/6,240' to 12,550' while
maintaining 12.2 ppg EMW. S/O wt 138
k. Mud wt out 11.5 ppg
6,240.0 12,550.0
2/1/2023
14:00
2/1/2023
14:15
0.25 INTRM3, CASING RUNL P Collect torque and drag data prior to
entering open hole, P/U wt 217 k, S/O
wt 139 k, ROT wt 182 k, 20 rpm @ 15
k/ft lbs trq. S/O wt w/rotation 158 k.
12,550.0 12,550.0
2/1/2023
14:15
2/2/2023
00:00
9.75 INTRM3, CASING RUNL P RIH with liner 9-7/8" liner with 5-7/8" drill
pipe f/12,550' to 16,168' while
maintaining 12.2 ppg EMW. S/O wt
w/rotation at 20 rpm 185 k / 14 k ft/lbs
trq. (22 - 26 k/ft lbs break over trq) Mud
wt out 11.5 ppg (Started pushing fluid
away at 15,000'.Stopped applying back
pressure while tripping in and losses
stabilized) 22 bbls total losses past 24
hrs.
12,550.0 16,168.0
2/2/2023
00:00
2/2/2023
07:00
7.00 INTRM3, CASING RUNL P RIH with liner 9-7/8" liner with 5-7/8" drill
pipe f/16,168' to 18,468' while
maintaining 12.2 ppg EMW. S/O wt
w/rotation at 20 rpm 198 k / 20 k ft/lbs
trq. Max break over torque 33 k ft/lbs.
Mud wt out 11.4+ ppg. SIMOPS - Build
vent assembly and prep to fill liner.
16,168.0 18,468.0
2/2/2023
07:00
2/2/2023
08:00
1.00 INTRM3, CASING RURD P M/U side entry sub vent assy. Tie in
cement hose to fill pipe and R/U bleed
lines to mud manifold.
18,468.0 18,468.0
2/2/2023
08:00
2/2/2023
08:30
0.50 INTRM3, CASING PRTS P Flood lines and PT to 1500 psi. Pull liner
in tension t/325 k. Presure up to 1111 psi
and rupture SD sub disk as per Baker
rep.
18,468.0 18,468.0
2/2/2023
08:30
2/2/2023
11:00
2.50 INTRM3, CASING CIRC P Fill liner w/11.5 ppg FWP and lubricate
and bleed as per program. Maintain
12.2 ppg EMW on annulus. 474 bbls to
fill and fluid pack liner.
18,468.0 18,468.0
2/2/2023
11:00
2/2/2023
13:00
2.00 INTRM3, CASING RURD P B/D lines and R/D vent assy. Bring
cement head to rig floor and load darts.
M/U cement head and R/U cement
hose.
18,468.0 18,468.0
2/2/2023
13:00
2/2/2023
22:15
9.25 INTRM3, CASING CIRC P Circ and condition mud/hole for cement
job. Stage flow rate up to 8 bpm / 879
psi. SIMOPS - L/D 6-5/8" DP via XY
crane.
18,468.0 18,468.0
2/2/2023
22:15
2/2/2023
23:45
1.50 INTRM3, CASING RURD P B/D lines and install lotorq valve on
cement head for isolation between rig
and Citadel. PT same to 5000 psi
(good). R/U test chart to mud manifold
and PJSM on setting liner.
18,468.0 18,468.0
2/2/2023
23:45
2/3/2023
00:00
0.25 INTRM3, CASING HOSO P S/O to nuetral wt and break connection
at cement head. Drop 1-1/2" liner setting
ball. M/U same. Pull liner in tension
w/328 k.
18,468.0 18,468.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 53/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/3/2023
00:00
2/3/2023
02:15
2.25 INTRM3, CASING HOSO P Pump down 1-1/2" phenolic ball w/6
bpm @ 471 psi for first 150 bbls.
Reduce rate to 2 bpm @ 316 psi for
remaining 152 bbls. 302 bbls total
pumped and ball on seat. Pressure up
to 2650 psi and slack off to confirm liner
is set. Slips did not engage. Pressure
up to 2900 psi and slack off to confirm
liner is set. Slips did not engage.
Pressure up to 3000 psi and slack off to
confirm liner is set. Slips did not engage.
Pressure up to 3200 psi and slack off to
confirm liner is set. Slips did not engage
and liner running tools released. Liner is
sitting on bottom at 18,468'. Initial P/U
wt was 345 k and liner would not move
up the hole. Final hook load after liner is
released is 243 k with free travel. At this
point ball is still on seat.
18,468.0 18,468.0
2/3/2023
02:15
2/3/2023
03:30
1.25 INTRM3, CASING WAIT T R/D cement lines and discuss plan
forward options with Drilling
Superintendent. Plan forward is to
proceed with shifting DOBS, blow ball
off seat, and cement liner as per
approved section plan.
18,468.0 18,468.0
2/3/2023
03:30
2/3/2023
04:30
1.00 INTRM3, CEMENT HOSO T Attempt to shear the burst disk in HRDE
running tools, shift the DOBS and blow
ball off seat. Come on with pumps at 1
bpm @ 750 psi. Increase flow rate to
1.75 bpm @ 1150 psi and returns
observed at shakers. Pump rate is half
the rate and 3 times the pressure as the
previous circulation rate. There is no
positive indication that the ball is off
seat. No formation losses during this
operation. Shut down and discuss plan
forward options town.
18,468.0 18,468.0
2/3/2023
04:30
2/3/2023
07:00
2.50 INTRM3, CEMENT WAIT T B/D cementing lines and line up to
monitor well through MPD system
across top of the hole. Discuss plan
forward options with town.
18,468.0 18,468.0
2/3/2023
07:00
2/3/2023
07:15
0.25 INTRM3, CEMENT RURD T B/D MPD lines. PJSM on up-coming
operations with rig team.
18,468.0 18,468.0
2/3/2023
07:15
2/3/2023
08:30
1.25 INTRM3, CEMENT HOSO T Attempt to shift DOBS and blow ball off
seat. S/O string wt to 165 k. Pressure up
to 3750 psi and attempt to hold
pressure. Pressure bled off to 850 psi
over 12 min. Pressure up to 3900 psi
and dynamically maintain pressure.
Stop pumping and pressure bled off to
850 psi over 12 min. Pressure up to
4000 psi and dynamically maintain
pressure. Stop pumping and pressure
bled off to 850 psi over 12 min. Pressure
back up to 2000 psi and not able to hold
pressure. Attempt to blow ball off seat
and function DOBS was unsuccessful.
No formation losses.
18,468.0 18,468.0
2/3/2023
08:30
2/3/2023
11:30
3.00 INTRM3, CEMENT CIRC T Circulate and 1 bpm @ 865 psi and
discuss past operations and plan
forward operations with town. Pick up on
string 2' over break over wt and perform
circ test at 1 bpm @ 522 psi. Pump
pressure was ~300 psi less indicating
lower seals on pack off could be
damaged.
18,468.0 18,468.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 54/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/3/2023
11:30
2/3/2023
12:30
1.00 INTRM3, CEMENT RURD T B/D cement lines and L/D Citadel
cement head. P/U single from pipe shed
and rack back 1 stand of DP. L/D 15'
space out pup.
18,468.0 18,468.0
2/3/2023
12:30
2/3/2023
13:30
1.00 INTRM3, CEMENT TRIP T Pull liner running tools out of top of liner.
Pump at 1 bpm to confirm when fully
out. Initial SPP 350 psi and final 193 psi
once fully out. Took 80 k over pull to pull
liner running tools out of top of the
packer mandrel. TOL 12,423'. Free P/U
wt 230 k.
18,468.0 12,423.0
2/3/2023
13:30
2/3/2023
14:00
0.50 INTRM3, CEMENT CIRC T Pump 35 bbl dry job. B/D top drive.
Collect torque and drag data. P/U wt 30
k, S/O wt 170 k, ROT wt 206 k, 10 k
ft/lbs trq at 10 rpm.
12,423.0 12,423.0
2/3/2023
14:00
2/3/2023
14:30
0.50 INTRM3, CEMENT MPDA T Pull 5-7/8" RCD bearing. 12,423.0 12,423.0
2/3/2023
14:30
2/3/2023
14:45
0.25 INTRM3, CEMENT OWFF T OWFF 15 min (static) 12,423.0 12,423.0
2/3/2023
14:45
2/4/2023
00:00
9.25 INTRM3, CEMENT TRIP T POOH on elevators f/12,423' to 433'.
Monitor hole fill on trip tank. No losses
observed. OWFF at 2,000' (static)
12,423.0 433.0
2/4/2023
00:00
2/4/2023
00:30
0.50 INTRM3, CEMENT TRIP T POOH on elevators f/433' to liner
running tools. Monitor hole fill on trip
tank. No losses observed.
433.0 0.0
2/4/2023
00:30
2/4/2023
02:00
1.50 INTRM3, CEMENT BHAH T Break down and inspect liner running
tools.
Initial visual inspection of liner running
tools. HRDE had been released as
expected. Upper pack-off seals fully
intact with slight damage most likely
from trip out. Lower pack-off body
significantly damaged and eroded and
seal rings were missing. Weep holes in
LFC were packed full of debris and
white plastic tape. Metal shavings and
metal debris sitting on top liner wiper
plugs. Liner wiper plugs were damaged
most likely from the trip out.
Internal inspection of liner running tools
after break down. Ball was still on seat
and the DOBS had not been
shifted/stroked down. Solid mud over air
barrier had been tripped as expected.
0.0 0.0
2/4/2023
02:00
2/4/2023
03:00
1.00 INTRM3, CEMENT BHAH T Clean and clear floor of liner running
tools and equipment.
0.0 0.0
2/4/2023
03:00
2/4/2023
05:00
2.00 INTRM3, CEMENT SLPC T Slip and cut drilling line. 0.0 0.0
2/4/2023
05:00
2/4/2023
07:15
2.25 INTRM3, CEMENT RURD T C/O saver sub from VX-57 to VX-69.
Perform block calibration and inspect
deadman.
0.0 0.0
2/4/2023
07:15
2/4/2023
08:30
1.25 INTRM3, WHDBOP WWWH P M/U stack washing tool and RIH.
Function rams and annular. Flush stack.
B/D lines.
0.0 0.0
2/4/2023
08:30
2/4/2023
12:00
3.50 INTRM3, WHDBOP RURD P Shut in blind rams and bleed off
Koomey. C/O upper rams to 4-1/2" x 7-
5/8" VBR's. M/U wear ring puller and
pull same. Set test plug. R/U to test
BOPE's. Fill stack with H2O and purge
air from system. Perform shell test.
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 55/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/4/2023
12:00
2/5/2023
00:00
12.00 INTRM3, WHDBOP BOPE P Test BOPE's w/4-1/2", 6-5/8" and 7-5/8"
test joints to 250 psi for 5 min / 4000 psi
for 10 min. Annular 250 psi for 5 min /
2500 psi for 10 min. Upper VBR's 4-1/2"
X 7-5/8", lower VBR's 3-1/2" X 6-5/8",
choke valves #1 - #16, choke/kill
manuals & HCR's, upper/lower IBOP, #1
and #2 FOSV, dart valve, and
blind/shear rams. Perform draw down
on manual and super choke. Test gas
alarms and PVT alarms. Perform
Koomey draw down. 28 sec/200 psi,
154 sec/full pressure. 10 bottles 4000
psi average. AOGCC - Sean Sullivan
waive witness of test. BLM - Quinn
Sawyer witness test.
0.0 0.0
2/5/2023
00:00
2/5/2023
00:30
0.50 INTRM3, WHDBOP BOPE P Test upper rams with 7-5/8" test joint to
250 psi for 5 min / 4000 psi for 10 min.
0.0 0.0
2/5/2023
00:30
2/5/2023
04:00
3.50 INTRM3, WHDBOP RURD P R/D testing equipment and B/D lines.
Clean and clear rig floor. Pull test plug
and set wear ring.
0.0 0.0
2/5/2023
04:00
2/5/2023
06:00
2.00 INTRM3, CEMENT BHAH T M/U Baker TST packer BHA to 84' 0.0 84.0
2/5/2023
06:00
2/5/2023
16:00
10.00 INTRM3, CEMENT TRIP T RIH f/84' to 10,486' w/5-7/8" DP. Fill pipe
and break circulation every 2,500'. S/O
wt 149 k. Installed rotating dog sub on
top of stand 61.
84.0 10,486.0
2/5/2023
16:00
2/5/2023
16:30
0.50 INTRM3, CEMENT RURD T C/O handling equipment to 6-5/8". C/O
inserts in PS-21's. M/U 5-7/8" x 6-5/8"
XO.
10,486.0 10,486.0
2/5/2023
16:30
2/5/2023
18:00
1.50 INTRM3, CEMENT TRIP T RIH f/10,486' to 12,354' w/6-5/8" DP. 10,486.0 12,354.0
2/5/2023
18:00
2/5/2023
19:00
1.00 INTRM3, CEMENT TRIP T Cont. RIH washing down thru liner top
w/250 gpm @ 320 psi f/12,354' to
12,485'
12,354.0 12,485.0
2/5/2023
19:00
2/5/2023
21:30
2.50 INTRM3, CEMENT CIRC T Circ and condition mud surface to
surface w/420 gpm @ 390 psi. P/U wt
252 k, S/O wt 153 k. 11.5 ppg In/Out
12,485.0 12,485.0
2/5/2023
21:30
2/6/2023
00:00
2.50 INTRM3, CEMENT TRIP T RIH f/12,485' to 14,491' w/6-5/8" DP.
(Pumped at 2 bpm as TST packer
entered liner top) Fill pipe and break circ
every 2,000' P/U wt 292 k, S/O wt 153 k.
12,485.0 14,491.0
2/6/2023
00:00
2/6/2023
04:30
4.50 INTRM3, CEMENT TRIP T RIH f/14,491' to 17,932' w/6-5/8" DP. Fill
pipe and break circ every 2,000'
14,491.0 17,932.0
2/6/2023
04:30
2/6/2023
06:00
1.50 INTRM3, CEMENT MPDA T Install 6-5/8" RCD bearing for cementing
contingency if the floats do not hold.
17,932.0 17,932.0
2/6/2023
06:00
2/6/2023
06:30
0.50 INTRM3, CEMENT TRIP T RIH f/17,932' to 18,174' and no go out
rotating dog sub on liner top. POOH to
18,147' and space out for cement job.
14,491.0 18,147.0
2/6/2023
06:30
2/6/2023
07:00
0.50 INTRM3, CEMENT MPSP T Break circ at 3 bpm @ 300 psi and
confirm fluid path around TST packer is
clear. Set packer as per Baker rep. Put
12 wraps to the left and work down. Set
down w/30 k wob to confirm set.,
18,147.0 18,147.0
2/6/2023
07:00
2/6/2023
07:45
0.75 INTRM3, CEMENT RURD T B/D top drive. R/U TIW, head pin and
cement hose. PT lines to 4000 psi.
18,147.0 18,147.0
2/6/2023
07:45
2/6/2023
13:15
5.50 INTRM3, CEMENT CIRC T Slowly stage rat up to 8 bpm @ 670 psi
and circ and condition for cement job
with full returns. No losses to formation
and no issues staging up to full rate.
18,147.0 18,147.0
2/6/2023
13:15
2/6/2023
13:45
0.50 INTRM3, CEMENT RURD P Blow air to cementers. Fluid pack lines
with H2O and PT 3000 psi. PJSM on
cementing.
18,147.0 18,147.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 56/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/6/2023
13:45
2/6/2023
16:15
2.50 INTRM3, CEMENT CMNT P Cement 9-7/8" liner. SLB pump 100 bbls
13.0 ppg mud push, 147 bbls 15.8 ppg
UniSlurry cement, 5 bbls H2O, drop
foam ball, 20 bbls 13.0 ppg mud push
and clear lines with 20 bbls H2O with 6
bpm @ 600 psi. Turn over to rig for
displacement. Rig pump 471 bbls 11.5
ppg FWP with 6 bpm @ 600 psi with full
returns.
18,147.0 18,147.0
2/6/2023
16:15
2/6/2023
16:45
0.50 INTRM3, CEMENT PACK P B/D lines. Check floats (good). R/D
cementing lines. Un-seat TST packer as
per Baker rep.
Pick up double in the mouse hole, tag
TOL with RDS and slack off 80k to set
liner top packer. Observed shear. Pick
back up and rotate down to TOL and
stack 80k wt while rotating to conifirm
packer set.
18,147.0 18,147.0
2/6/2023
16:45
2/6/2023
17:00
0.25 INTRM3, CEMENT TRIP P POOH f/18,147' to 18,021' 18,147.0 18,021.0
2/6/2023
17:00
2/6/2023
17:30
0.50 INTRM3, CEMENT MPDA P Pull 6-5/8" RCD bearing. 18,021.0 18,021.0
2/6/2023
17:30
2/6/2023
21:30
4.00 INTRM3, CEMENT CIRC P Drop foam wiper ball and circ and cond
mud for 2X liner volume w/6 bpm @ 370
psi. P/U wt 320 k, S/O wt 155 k.
Reciprocate pipe full stand. 100 bbls
after the foam ball exited the bull nose
and started coming up the annulus we
saw an increase in pump pressure from
370 psi to 600 psi and a 6 - 10 k
increase in hook load. Reduced flow
rate to 1 bpm and pump pressure was
the same. This led us to believe we
rolled the seals on the TST packer.
Discussed plan forward options with
team and decided to suspend any more
circulating inside the 9-7/8" liner and
finish circulating on top of liner. Pump
dry job and B/D top drive. SIMOPS - L/D
6-5/8" DP from derrick via mouse hole.
18,021.0 18,021.0
2/6/2023
21:30
2/6/2023
23:00
1.50 INTRM3, CEMENT OWFF P OWFF (static) SIMOPS - Shuffle 5-7/8"
DP in derrick from drillers side to off
drillers side. Prep to L/D 6-5/8" DP
18,021.0 18,021.0
2/6/2023
23:00
2/7/2023
00:00
1.00 INTRM3, CEMENT PULD P POOH laying down 6-5/8" DP f/18,021'
to 17,870' P/U wt 360 k, S/O wt 168 k
18,021.0 17,870.0
2/7/2023
00:00
2/7/2023
09:00
9.00 INTRM3, CEMENT PULD P POOH laying down 6-5/8" DP f/17,870'
to 12,472' P/U wt 290 k
17,870.0 12,472.0
2/7/2023
09:00
2/7/2023
10:00
1.00 INTRM3, CEMENT CIRC P Circulate 9-7/8" liner top and 13-5/8"
acing clean w/1500 gpm, 3166 psi for
1.5 B/U. Significant amount of cuttings,
shoe track dpris and washed out TST
packer seals.
12,472.0 12,472.0
2/7/2023
10:00
2/7/2023
10:30
0.50 INTRM3, CEMENT RURD P Pump 30 bbls 13.5 ppg dry job. B/D top
drive.
12,472.0 12,472.0
2/7/2023
10:30
2/7/2023
12:00
1.50 INTRM3, CEMENT PULD P POOH laying down 6-5/8" DP f/12,472'
to 10,484' P/U wt 254 k
12,472.0 10,484.0
2/7/2023
12:00
2/7/2023
12:30
0.50 INTRM3, CEMENT RURD P C/O handling equipment from 6-5/8" to 5
-7/8"
10,484.0 10,484.0
2/7/2023
12:30
2/7/2023
20:00
7.50 INTRM3, CEMENT TRIP P POOH racking back 5-7/8" DP in derrick
f/10,484' to 84
10,484.0 84.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 57/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/7/2023
20:00
2/7/2023
20:45
0.75 INTRM3, CEMENT BHAH P C/O handling equipment to 5". L/D TST
packer assy. Seals on packer were
damaged and rolled. 6" x 3" piece
missing off packer element. Prep packer
for immediate return back to Bakers
Shop to get rebuilt. ETA back to rig 8:00
- 9:00 hrs
84.0 0.0
2/7/2023
20:45
2/7/2023
22:00
1.25 INTRM3, CEMENT PRTS T R/U testing equipment and fluid pack
lines. Attempted to pressure test the 9-
7/8” X 13-5/8” ZXP liner top packer.
Started pumping at 1 bpm down the kill
line, monitoring pressures on IA gauge
and SPP gauge. Took 23.5 bbls to
pressure up to 2200 psi. At this point it
looked like we established an injection
rate. Continued to pump an additional
1.5 bbls for 25 bbls total and it looked
like we were starting to leak off. I
stopped pumping and shut in at the
HCR kill. The IA quickly bled off to 1100
psi and attempted to stabilize, the
SPP/rig side stayed constant validating
the leak was down hole. Bled off
pressure and gained only 10 bbls. FIT
for the 13-5/8” shoe was 14.6 ppg / 1100
psi. CIP was 16:15 hrs on 2/6/23.
Discuss results of pressure test results
with Drilling Superintendent.
0.0 0.0
2/7/2023
22:00
2/8/2023
00:00
2.00 INTRM3, CEMENT SVRG T Service rig. House keeping and MP2's.
C/O saver sub to VX-57. Perform
maintenance on rig pumps.
0.0 0.0
2/8/2023
00:00
2/8/2023
12:00
12.00 INTRM3, CEMENT SVRG T Service rig. House keeping and MP2's.
Cont. C/O saver sub to VX-57. C/O
wash pipe on top drive. Perform
maintenance on rig pumps. C/O
pulsation dampener on mud pump #2.
Balance rig tong counter weights. Dress
PS-21's for 4-1/2". SIMOPS - Waiting on
TST packer to be rebuilt in Baker's Shop
in Deadhorse. Discuss plan forward
options with drilling team.
0.0 0.0
2/8/2023
12:00
2/8/2023
18:00
6.00 INTRM3, CEMENT SVRG T Service rig. House keeping and MP2's.
Perform maintenance on rig pumps. C/O
pulsation dampener on mud pump #2.
Balance rig tong counter weights.
Replace auger bearing in CPU.
SIMOPS - Waiting on TST packer to be
rebuilt in Baker's Shop in Deadhorse.
0.0 0.0
2/8/2023
18:00
2/8/2023
19:30
1.50 INTRM3, CEMENT SVRG T Service rig. House keeping and MP2's.
SIMOPS - Packer arrive on location
18:00 hrs. Load packer in pipe shed and
prep for BHA.
0.0 0.0
2/8/2023
19:30
2/8/2023
20:30
1.00 INTRM3, CEMENT BHAH T M/U TST packer BHA to 86' 0.0 86.0
2/8/2023
20:30
2/9/2023
00:00
3.50 INTRM3, CEMENT PULD T RIH TST packer assy f/86' to 2,418'
while picking up 4-1/2" DP from pipe
shed at 60 ft/min running speed. Fill
pipe every 2500' w/4 bpm max. S/O wt
114 k.
86.0 2,418.0
2/9/2023
00:00
2/9/2023
06:45
6.75 INTRM3, CEMENT PULD T RIH TST packer assy f/2,418' to 6,032'
while picking up 4-1/2" DP from pipe
shed at 60 ft/min running speed. Fill
pipe every 2500' w/4 bpm max. S/O wt
133 k.
2,418.0 6,032.0
2/9/2023
06:45
2/9/2023
07:00
0.25 INTRM3, CEMENT RURD T C/O handling equipment to 5-7/8". C/O
inserts in PS-21's
6,032.0 6,032.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 58/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/9/2023
07:00
2/9/2023
12:00
5.00 INTRM3, CEMENT TRIP T RIH w/TST packer assy on 5-7/8" DP
f/6,032' to 12,437' S/O wt 151 k. Pipe
filling on its own.
6,032.0 12,437.0
2/9/2023
12:00
2/9/2023
12:15
0.25 INTRM3, CEMENT TRIP T RIH w/TST packer assy washing down
thru liner top w/4 bpm @ 125 psi
f/12,437' to 12,551'
12,437.0 12,551.0
2/9/2023
12:15
2/9/2023
12:30
0.25 INTRM3, CEMENT PACK T Set TST packer as per Baker rep. Apply
8 wraps to the left and set down 30 k
wob. Free S/O wt 150 k.
12,551.0 12,551.0
2/9/2023
12:30
2/9/2023
13:00
0.50 INTRM3, CEMENT RURD T B/D top drive and R/U testing
equipment. Fluid pack lines and PT lines
to 3500 psi.
12,551.0 12,551.0
2/9/2023
13:00
2/9/2023
14:30
1.50 INTRM3, CEMENT PRTS T First test is PT below packer against 9-
7/8" shoe track. Pump at 1 bpm, gained
pressure up to 1775 psi and then started
injecting fluid. Failed test. Pumped 7
bbls total and gained 3.6 bbls back to
trip tank.
Second test is above packer testing
ZXP liner top packer. Shut in on annular.
Pump at 1 bpm and pressure up to 3500
psi. Hold on chart for 30 min. Good test.
Pumped 18 bbls total and 18 bbls bled
back to trip tank.
12,551.0 12,551.0
2/9/2023
14:30
2/9/2023
15:00
0.50 INTRM3, CEMENT PACK T R/D testing equipment and un-seat
packer as per Baker rep. Verify free
travel. P/U wt 226 k, S/O wt 151 k
12,551.0 12,551.0
2/9/2023
15:00
2/9/2023
21:00
6.00 INTRM3, CEMENT TRIP T RIH w/TST packer assy f/12,551' to
18,098'. Pipe filling on its own.P/U wt
301 k, S/O wt 152 k
12,551.0 18,098.0
2/9/2023
21:00
2/9/2023
22:15
1.25 INTRM3, CEMENT TRIP T RIH w/TST packer assy washing down
w/2 bpm @ 300 psi f/18,098' to 18,251'
and tag TOC w/10 k wob
18,098.0 18,251.0
2/9/2023
22:15
2/9/2023
22:30
0.25 INTRM3, CEMENT PACK T Set TST packer as per Baker rep. Apply
8 wraps to the left and set down 30 k
wob. Free S/O wt 152 k. Packer element
is at 18,170'
18,251.0 18,251.0
2/9/2023
22:30
2/9/2023
23:00
0.50 INTRM3, CEMENT RURD T B/D top drive and R/U testing
equipment. Fluid pack lines.
18,251.0 18,251.0
2/9/2023
23:00
2/10/2023
00:00
1.00 INTRM3, CEMENT PRTS T Shut in on annular and pump down kill
line only. Pressure test casing f/18,170'
to surface testing 9-7/8" liner and 13-
5/8" casing. Pump at 1 bpm and
pressure up to 3500 psi. Pumped 21.2
bbls total. Monitor drill string via open
lotorq valve.
18,251.0 18,251.0
2/10/2023
00:00
2/10/2023
00:30
0.50 INTRM3, CEMENT PRTS T Monitor 3500 psi pressure test for 30
min. Equalize pressures and bleed off.
Pumped 21.2 bbls total and bled back
21.2 bbls to trip tank.
18,251.0 18,251.0
2/10/2023
00:30
2/10/2023
00:45
0.25 INTRM3, CEMENT RURD T R/D testing equipment and B/D lines. 18,251.0 18,251.0
2/10/2023
00:45
2/10/2023
01:00
0.25 INTRM3, CEMENT PACK T Un-seat packer as per Baker rep. Verify
free travel. P/U wt 303 k, S/O wt 158 k
18,251.0 18,251.0
2/10/2023
01:00
2/10/2023
01:30
0.50 INTRM3, CEMENT TRIP T POOH w/TST packer f/18,251' to
18,156'. P/U wt 303 k
18,251.0 18,156.0
2/10/2023
01:30
2/10/2023
02:00
0.50 INTRM3, CEMENT RURD T Pump 20 bbl 13.5 ppg dry job. B/D top
drive and prep to POOH. OWFF - Static
18,156.0 18,156.0
2/10/2023
02:00
2/10/2023
02:30
0.50 INTRM3, CEMENT SVRG T Service rig, top drive and draw works.
Service ST-120.
18,156.0 18,156.0
2/10/2023
02:30
2/10/2023
12:00
9.50 INTRM3, CEMENT TRIP T POOH w/TST packer assy f/18,156' to
6,685'. P/U wt 160 k. Monitor hole fill via
trip tank.
18,156.0 6,685.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 59/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/10/2023
12:00
2/10/2023
17:30
5.50 INTRM3, CEMENT TRIP T POOH w/TST packer assy f/6,685' to
86'. Monitor hole fill via trip tank.
6,685.0 86.0
2/10/2023
17:30
2/10/2023
18:00
0.50 INTRM3, CEMENT BHAH T L/D TST packer BHA as per Baker rep.
Packer in good shape. Bull nose was
packed off with contaminated cement.
Prepped packer for immediate return to
Baker's Shop in Deadhorse for rebuild.
86.0 0.0
2/10/2023
18:00
2/10/2023
21:30
3.50 INTRM3, DRILLOUT BHAH P Clean and clear rig floor. Mobilize BHA
tools and equipment to rig floor. Prep to
P/U BHA.
0.0 0.0
2/10/2023
21:30
2/11/2023
00:00
2.50 INTRM3, DRILLOUT BHAH P M/U 8-1/2" x 10-1/4" Intermediate #4
drilling BHA to 143'
0.0 143.0
2/11/2023
00:00
2/11/2023
04:00
4.00 INTRM3, DRILLOUT BHAH P M/U 8-1/2" x 10-1/4" Intermediate #4
drilling BHA f/143' to 534'
143.0 534.0
2/11/2023
04:00
2/11/2023
07:00
3.00 INTRM3, DRILLOUT PULD P RIH Intermediate #4 drilling BHA f/534'
to 3,179' while picking 4-1/2" DP (84 jts
total)
534.0 3,179.0
2/11/2023
07:00
2/11/2023
08:00
1.00 INTRM3, DRILLOUT DHEQ P Fill DP and shallow hole test MWD/LWD
tools w/500 gpm, 1475 psi. B/D top
drive.
3,179.0 3,179.0
2/11/2023
08:00
2/11/2023
09:45
1.75 INTRM3, DRILLOUT TRIP P RIH w/4-1/2" DP out of derrick f/3,179'
to 6,196'
3,179.0 6,196.0
2/11/2023
09:45
2/11/2023
11:30
1.75 INTRM3, DRILLOUT DHEQ P Fill DP and test MWD/LWD tools w/700
gpm, 3140 psi. B/D top drive.
6,196.0 6,196.0
2/11/2023
11:30
2/11/2023
13:30
2.00 INTRM3, DRILLOUT TRIP P RIH w/4-1/2" DP out of derrick f/6,196'
to 9,126'
6,196.0 9,126.0
2/11/2023
13:30
2/11/2023
14:30
1.00 INTRM3, DRILLOUT RURD P C/O handling equipment to 5-7/8". C/O
inserts in PS-21's.
9,126.0 9,126.0
2/11/2023
14:30
2/11/2023
15:15
0.75 INTRM3, DRILLOUT TRIP P RIH w/stand of 5-7/8" DP f/9,126' to
9,218'. Fill pipe. B/D top drive.
9,126.0 9,218.0
2/11/2023
15:15
2/11/2023
19:30
4.25 INTRM3, DRILLOUT SLPC P Hang blocks. Slip and cut 75' drill line.
Un-hang blocks. Calibrate block height
in Amphion. Perform empty block
calibration.
9,218.0 9,218.0
2/11/2023
19:30
2/12/2023
00:00
4.50 INTRM3, DRILLOUT TRIP P RIH w/stands of 5-7/8" DP f/9,218' to
13,190'. Fill pipe every 25 stands and
B/D top drive. P/U wt 218 k, S/O wt 140
k.
The ILS stabilizer in the BHA was
hanging up on the liner top. Rotated ILS
thru TOL @ 10 rpm with no issue.
9,218.0 13,190.0
2/12/2023
00:00
2/12/2023
04:45
4.75 INTRM3, DRILLOUT TRIP P RIH w/stands of 5-7/8" DP f/13,190' to
18,036'. Fill pipe every 25 stands and
B/D top drive. P/U wt 280 k, S/O wt 140
k.
13,190.0 18,036.0
2/12/2023
04:45
2/12/2023
06:45
2.00 INTRM3, DRILLOUT COCF P W&R f/18,036' and clean out cement to
landing collar at 18,333' w/500 gpm,
2790 psi, 5 k wob, 40 rpm, P/U wt 307 k,
S/O wt 155 k, ROT wt 208 k, 30 k ft/lbs
trq.
18,036.0 18,333.0
2/12/2023
06:45
2/12/2023
07:45
1.00 INTRM3, DRILLOUT CIRC P Circ and condition w/500 gpm, 2750 psi.
SIMOPS - Prep for OBM displacement.
18,333.0 18,333.0
2/12/2023
07:45
2/12/2023
11:45
4.00 INTRM3, DRILLOUT DISP P Displace well to 11.5 OBM w/500 gpm,
3520 psi, 80 rpm, 25 k trq.
18,333.0 18,333.0
2/12/2023
11:45
2/12/2023
15:00
3.25 INTRM3, DRILLOUT DHEQ T Trouble shoot LWD tools Having
detection and noise issues.
18,333.0 18,333.0
2/12/2023
15:00
2/12/2023
15:30
0.50 INTRM3, DRILLOUT CIRC P Obtain SPR's. 18,333.0 18,333.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 60/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/12/2023
15:30
2/13/2023
00:00
8.50 INTRM3, DRILLOUT DRLG P Drill shoe track f/18,333' to 18,464'
w/600 - 650 gpm, 4500 - 5400 psi, 12 -
14 k wob, 80 rpm, P/U wt 258 k, S/O wt
175 k, ROT wt 211 k, 14/18 k ft/lbs trq.
SIMOPS- Swapped out mud pump
liners to 5-1/2"
18,333.0 18,468.0
2/13/2023
00:00
2/13/2023
01:00
1.00 INTRM3, DRILLOUT DRLG P Drill shoe f/18,464' to 18,468' w/600
gpm, 4600 psi, 12 - 14 k wob, 80 - 100
rpm, P/U wt 258 k, S/O wt 175 k, ROT
wt 211 k, 14/17 k ft/lbs trq.
18,464.0 18,468.0
2/13/2023
01:00
2/13/2023
01:30
0.50 INTRM3, DRILLOUT DDRL P Drill new formation f/18,468' to 18,475'
MD / 6,897' TVD. ADT .33 Hrs. 600
gpm, 4600 psi, 12.3 ppg ECD, 12 k wob,
80 - 100 rpm, P/U wt 258 k, S/O wt 175
k, ROT wt 211 k, 14/18 k ft/lbs trq. Work
thru shoe track 3X's
18,468.0 18,475.0
2/13/2023
01:30
2/13/2023
07:15
5.75 INTRM3, DRILLOUT CIRC P Circ and condition w/600 - 650 gpm,
4600 - 5250 psi, 60 - 100 rpm, 14 - 18 k
ft/lbs trq. Reciprocate full 30 - 45'.
SIMOPS - C/O pump liners to 5-1/2" in
MP #3
18,475.0 18,475.0
2/13/2023
07:15
2/13/2023
07:45
0.50 INTRM3, DRILLOUT CIRC P Funtion test mud pumps #2 and #3 with
5-1/2" liners at 700 gpm, 6300 psi.
BROOH to 18,422'
18,475.0 18,422.0
2/13/2023
07:45
2/13/2023
11:00
3.25 INTRM3, DRILLOUT MPDA P Remove PS-21's. Install 5-7/8" RCD
bearing, Re-install PS-21's. Function
test MPD as per rig advisors.
18,422.0 18,422.0
2/13/2023
11:00
2/13/2023
11:30
0.50 INTRM3, DRILLOUT DHEQ P Downlink to LWD tools. Fine tune
detection and communication with smart
tools.
18,422.0 18,422.0
2/13/2023
11:30
2/13/2023
12:00
0.50 INTRM3, DRILLOUT REAM P W&R back to TD f/18,422' to 18,475'
w/700 gpm, 6160 psi, 30 - 60 rpm, 15 k
ft/lbs trq.
18,422.0 18,475.0
2/13/2023
12:00
2/13/2023
14:15
2.25 INTRM3, DRILLOUT DDRL P Drill ahead f/18,475' to 18,488' MD /
6,900' TVD. ADT 1.05 Hrs. 700 gpm,
6160 psi, 12.44 ppg ECD, 5 - 12 k wob,
60 - 80 rpm, P/U wt 258 k, S/O wt 175 k,
ROT wt 211 k, 14/18 k ft/lbs trq.
18,475.0 18,488.0
2/13/2023
14:15
2/13/2023
15:15
1.00 INTRM3, DRILLOUT DHEQ P Downlink to LWD tools. Fine tune
detection and communication with smart
tools.
18,488.0 18,488.0
2/13/2023
15:15
2/13/2023
16:00
0.75 INTRM3, DRILLOUT CIRC P Circ and condition for FIT w/700 gpm,
6100 psi, 80 rpm, 10 k ft/lbs trq. BROOH
to 18,403', inside 9-7/8" shoe.
18,488.0 18,403.0
2/13/2023
16:00
2/13/2023
17:00
1.00 INTRM3, DRILLOUT FIT P R/U testing equipment. Perform FIT to
14.5 ppg (1075 psi w/11.5 ppg OBM)
Chart for 30 min (good). Pump 10.2 bbls
and bleed back 9.8 bbls to trip tank.
16,403.0 18,403.0
2/13/2023
17:00
2/13/2023
18:00
1.00 INTRM4, DRILL RURD P R/D testing equipment and B/D lines. 18,403.0 18,403.0
2/13/2023
18:00
2/13/2023
19:00
1.00 INTRM4, DRILL REAM P W&R back to TD f/18,403' to 18,488'
w/700 gpm, 6130 psi, 60 rpm, 15 k ft/lbs
trq.
18,403.0 18,488.0
2/13/2023
19:00
2/14/2023
00:00
5.00 INTRM4, DRILL DDRL P Drill ahead f/18,488' to 18,682' MD /
6,939' TVD. ADT 4.02 Hrs. 700 gpm,
6050 psi, 8 k wob, 120 rpm, P/U wt 257
k, S/O wt 162 k, ROT wt 204 k, 14/12 k
ft/lbs trq. Maintaining 13.3 ppg EMW
with MPD.
18,488.0 18,682.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 61/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/14/2023
00:00
2/14/2023
02:15
2.25 INTRM4, DRILL UREM P Index 10-1/4" XS2 Rhino Reamer.
BROOH f/18,682' to 18,663' (Reamer
blades 20' below 9-7/8" shoe). Collect
base parameters. Drop 1-1/4" ball and
pump down as per reamer rep w/250
gpm, 1580 psi initial and 200 gpm, 1370
psi final. Ball on seat 261 bbls / 2608
stks. Pressure up to 1800 psi to blow
ball seat and activate reamer. Under-
ream 8-1/2" hole to 10-1/4" f/18,663' to
18,470' w/700 gpm at 50 rpm. Ream
thru twice. Kill rotation and pull test
against 9-7/8" shoe with 10 k over pull.
Free P/U wt 254 k. Pull 264 k max.
Base parameters with reamer closed:
700 gpm, 6050 psi, 3632 TRPM,
Base parameters with reamer open: 700
gpm, 5700 psi, 3281 TRPM
18,682.0 18,663.0
2/14/2023
02:15
2/14/2023
02:30
0.25 INTRM4, DRILL UREM P W&R under reaming 8-1/2" hole to 10-
1/4" f/18,663' to 18,682' w/700 gpm,
5700 psi, 100 rpm, 28 - 26 k ft/lbs trq.
18,663.0 18,682.0
2/14/2023
02:30
2/14/2023
12:00
9.50 INTRM4, DRILL DDRL P Drill ahead 8-1/2" x 10-1/4" hole
f/18,682' to 19,190' MD / 7,023' TVD.
ADT 6.57 Hrs. 700 gpm, 5527 psi, 8-12
k wob, 120 rpm, P/U wt 283 k, S/O wt
132 k, ROT wt 197 k, 23/14 k ft/lbs trq.
Maintaining 13.3 ppg EMW with MPD.
18,682.0 19,190.0
2/14/2023
12:00
2/15/2023
00:00
12.00 INTRM4, DRILL DDRL P Drill ahead 8-1/2" x 10-1/4" hole
f/19,190' to 19,890' MD / 7,103' TVD.
ADT 8.6 Hrs. 700 gpm, 5605 psi, 9 k
wob, 120 rpm, P/U wt 275 k, S/O wt 133
k, ROT wt 201 k, 23/14 k ft/lbs trq.
Maintaining 13.3 ppg EMW with MPD.
19,190.0 19,890.0
2/15/2023
00:00
2/15/2023
12:00
12.00 INTRM4, DRILL DDRL P Drill ahead 8-1/2" x 10-1/4" hole
f/19,890' to 20,158' MD / 7,121' TVD.
ADT 9.98 Hrs. 700 gpm, 5530 psi, 10 -
15 k wob, 120 rpm, P/U wt 284 k, S/O
wt 130 k, ROT wt 201 k, 25/14 k ft/lbs
trq. Maintaining 13.3 ppg EMW with
MPD.
19,890.0 20,158.0
2/15/2023
12:00
2/15/2023
17:30
5.50 INTRM4, DRILL DDRL P Drill ahead 8-1/2" x 10-1/4" hole
f/20,158' to 20,448' MD / 7,135' TVD.
ADT 4.57 Hrs. 700 gpm, 5530 psi, 10 -
15 k wob, 120 rpm, P/U wt 284 k, S/O
wt 130 k, ROT wt 201 k, 25/14 k ft/lbs
trq. Maintaining 13.3 ppg EMW with
MPD.
20,158.0 20,448.0
2/15/2023
17:30
2/15/2023
18:15
0.75 INTRM4, TRIPCAS CIRC P Pump up final survey. Pump 50 bbl / 75
ppb LCM pill and spot outside bit with
700 gpm, 5570 psi, 100 rpm, 24 k ft/lbs
trq
20,448.0 20,448.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 62/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/15/2023
18:15
2/15/2023
21:30
3.25 INTRM4, TRIPCAS FIT P Line up active system to 1 pit. Rotate
drill string at 20 rpm / 12 k ft/lbs trq.
Pump at 700 gpm and attempt to
dynamic FIT to 14.5 ppg EMW. Apply
surface back pressure in 40 psi
increments. Achieved 13.72 ppg EMW.
Continued to increase back pressure
and started inducing formation losses.
LOT = 13.75 ppg. Pump 50 bbls / 55
ppb LCM pill and slow roll w/250 gpm
across open hole. Slowly decrease back
pressure and formation stabilize with no
losses at 13.2 ppg EMW. Discuss plan
forward and mud cap options with
drilling team.
Dynamic FIT Results:
Initial 700 gpm, 5640 psi, 350 psi back
pressure, 13.25 ppg EMW
Final 700 gpm, 5850 psi, 520 psi back
pressure, 13.72 ppg EMW
20,448.0 20,448.0
2/15/2023
21:30
2/15/2023
22:30
1.00 INTRM4, TRIPCAS UREM P Collect open base parameters. Drop 1-
5/8" ball and pump down as per reamer
rep w/250 gpm, 1560 psi initial and 100
gpm, 1100 psi final. Ball on seat 260
bbls / 2620 stks. Pressure up to 2800
psi to blow ball seat and close reamer.
Stage flow rate to 700 gpm and collect
closed parameters.
Base parameters with reamer open: 700
gpm, 5560 psi, 3320 TRPM
Base parameters with reamer closed:
700 gpm, 5850 psi, 3671 TRPM
20,448.0 20,448.0
2/15/2023
22:30
2/15/2023
23:30
1.00 INTRM4, TRIPCAS CIRC P Collect SPR's. Pump 50 bbl / 75 ppb
LCM pill to bit with 700 gpm/ 5800 psi.
Reduce pump rate to 250 gpm / 1600
psi and slow roll across open hole (163
bbls open hole volume)
20,448.0 20,448.0
2/15/2023
23:30
2/16/2023
00:00
0.50 INTRM4, TRIPCAS BKRM P Low energy BROOH w/150 gpm, 1130
psi, 30 rpm, 16 k ft/lbs trq, 25 ft/min
f/20,448' to 20,350'. Maintain 13.2 ppg
EMW Rotating P/U wt 225 k / ROT wt
196 k.
20,448.0 20,350.0
2/16/2023
00:00
2/16/2023
05:30
5.50 INTRM4, TRIPCAS BKRM P Low energy BROOH w/150 gpm, 1130
psi, 30 rpm, 14 k ft/lbs trq, 25 ft/min
f/20,350' to 18,680. Maintain13.2 ppg
EMW Rotating P/U wt 225 k / ROT wt
194 k.
20,350.0 18,680.0
2/16/2023
05:30
2/16/2023
06:00
0.50 INTRM4, TRIPCAS BKRM P Stay stationary and rotate at 5 rpm.
Pump 50 bbls/75 ppb LCM pill to the
BHA w/600 gpm / 4550 psi. (346
bbls/3460 stks)
18,680.0 18,680.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 63/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/16/2023
06:00
2/16/2023
07:30
1.50 INTRM4, TRIPCAS BKRM P Cont. low energy BROOH while laying
200' of LCM pill in open hole w/100
gpm, 1020 psi, 20 rpm, 15 k ft/lbs trq, 25
ft/min f/18,680' to 18,580'. Maintain 13.2
ppg EMW. Rotating P/U wt 220 k / ROT
wt 190 k. Pull BHA into shoe without
rotation f/18,580' to 18,406'. Free P/U wt
270 k. Observe 30 k over pull while bit
was coming thru the float shoe f/18,448'
to 18,442'. Had to work multiple times to
get BHA into the shoe. As it was pulling
tight the tight restriction in the shoe
induced formation losses.
18,680.0 18,406.0
2/16/2023
07:30
2/16/2023
21:30
14.00 INTRM4, TRIPCAS CIRC P Circ 9-7/8" x 13-5/8" casing clean w/650
gpm, 5040 psi, 80 rpm, 16 k ft/lbs trq.
Rotating wt 198 k. Work thru float shoe
2X and clear. Had to reduce EMW f/13.2
ppg to 13.0 ppg to minimize losses.
Reciprocate pipe staying above float
shoe. SIMOPS - Blend OBM mud cap in
tank farm to 12.5 ppg. Mobilize 12.5 ppg
OBM mud cap from mud plant. Prep for
displacement. Crane crew on location at
20:00 hrs. Fly Dril-Quip 7-5/8" liner
hanger/packer assy to liner shuttle on
pipe shed roof.
18,406.0 18,406.0
2/16/2023
21:30
2/17/2023
00:00
2.50 INTRM4, TRIPCAS DISP P Displace well to 12.5 ppg OBM mud cap
w/500 gpm, 3335 psi. Reciprocate pipe
w/80 rpm, 15 k ft/lbs trq, Rotating wt 196
k. Maintain 13.0 ppg EMW.
18,406.0 18,406.0
2/17/2023
00:00
2/17/2023
02:00
2.00 INTRM4, TRIPCAS DISP P Displace well to 12.5 ppg OBM mud cap
w/500 gpm, 3335 psi. Reciprocate pipe
w/80 rpm, 15 k ft/lbs trq, Rotating wt 196
k. Maintain 13.0 ppg EMW.
18,406.0 18,406.0
2/17/2023
02:00
2/17/2023
02:30
0.50 INTRM4, TRIPCAS OWFF P OWFF for 30 min (static). SIMOPS B/D
top drive and prep to StripOOH
18,406.0 18,406.0
2/17/2023
02:30
2/17/2023
15:30
13.00 INTRM4, TRIPCAS SMPD P StripOOH maintain 13.0 ppg EMW
f/18,406' to 9,222'. P/U wt 165 k. No
losses observed.
18,406.0 9,222.0
2/17/2023
15:30
2/17/2023
16:00
0.50 INTRM4, TRIPCAS RURD P Remove PS-21's and install master
bushings. Recover 3.5" hollow drift in
last stand of 5-7/8" DP
9,222.0 9,222.0
2/17/2023
16:00
2/17/2023
16:30
0.50 INTRM4, TRIPCAS SMPD P StripOOH f/9,222' to 9,161'. Break out
stand and drain in preparation for RCD
bearing removal. M/U stand back up.
9,222.0 9,161.0
2/17/2023
16:30
2/17/2023
17:30
1.00 INTRM4, TRIPCAS OWFF P Shut down MPD back pressure pump
and monitor well. Slight flow. Perform
breathing test. Shut in MPD chokes and
pressure build to 3 psi in 5 min. Open up
and monitor for 20 min (Slight ooze).
Shut in MPD chokes and pressure build
to 3 psi in 5 min. Open up and monitor
for 10 min (Slight ooze). Shut in MPD
chokes and pressure build to 2 psi in 5
min. Open up and monitor for 10 min
(Slight ooze). Well appears to be
breathing or mud is out of balance.
9,161.0 9,161.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 64/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/17/2023
17:30
2/17/2023
20:15
2.75 INTRM4, TRIPCAS MPDA P POOH with 5-7/8" RCD bearing to
9,126'. Remove from stand for rebuild.
Rack back stand of 5-7/8" DP . Pull out
of hole double of 4-1/2" DP to 9,063.
M/U 4-1/2" RCD bearing to double. Was
not able to fully engage RCD bearing
onto DP using RCD stand. Make two un
-successful attempts and bearing was
hung up on tool joint. Suspend trying to
use stand and M/U to drill string and
torque through. 4-1/2" RCD bearing is
above rotary table.
9,161.0 9,063.0
2/17/2023
20:15
2/17/2023
22:30
2.25 INTRM4, TRIPCAS OWFF P Line up to trip tank and monitor well for
flow. Monitor for 2 hours and cannot
confirm well is static. Slightly oozing and
not slowing down or gaining in speed.
Mud appears to out of balance. Discuss
plan forward operations with Drilling
Superintendent. Decision mad to
circulate surface to surface and
condition mud.
9,063.0 9,063.0
2/17/2023
22:30
2/18/2023
00:00
1.50 INTRM4, TRIPCAS CIRC P Circulate and condition mud to 12.5 ppg
w/500 gpm, 2930 psi. Rotate 10 rpm
and reciprocate pipe 30' keeping RCD
bearing above rotary table. Confirm mud
is out of balance. Lightest mud wt
observed going in is 12.3 ppg and
lightest mud wt coming out is 12.0 ppg.
9,063.0 9,063.0
2/18/2023
00:00
2/18/2023
02:30
2.50 INTRM4, TRIPCAS CIRC P Circulate and condition mud to 12.5 ppg
w/500 gpm, 2930 psi. Rotate 10 rpm
and reciprocate pipe 30' keeping RCD
bearing above rotary table. Confirm mud
is out of balance. Lightest mud wt
observed going in is 12.3 ppg and
lightest mud wt coming out is 12.0 ppg.
Circulated a total of 2 full circulations.
9,063.0 9,063.0
2/18/2023
02:30
2/18/2023
03:00
0.50 INTRM4, TRIPCAS OWFF P OWFF. Circulate for 15 min on trip tank.
(static). Monitor well for 15 min from
rotary table (static).
9,063.0 9,063.0
2/18/2023
03:00
2/18/2023
04:15
1.25 INTRM4, TRIPCAS MPDA P Install 4-1/2" RCD bearing. Circ through
MPD system and calibrate. RIH f/9,063'
to 9,127'. Break out of top drive and B/D
top drive.
9,063.0 9,063.0
2/18/2023
04:15
2/18/2023
12:15
8.00 INTRM4, TRIPCAS SMPD P Drop 2.9" OD hollow drift. StripOOH
maintaining 13.0 ppg EMW f/9,127' to
629'
9,127.0 629.0
2/18/2023
12:15
2/18/2023
12:45
0.50 INTRM4, TRIPCAS RURD P Remove stripping rubber from below
rotary table. Kick while tripping drill.
629.0 629.0
2/18/2023
12:45
2/18/2023
14:15
1.50 INTRM4, TRIPCAS OWFF P Shut down MPD back pressure and
open up 2" line to OBM tote. OWFF.
Oozing for 60 min, then static. SIMOPS
- Blow down MPD lines and prep to
remove RCD bearing. Mobilize SLB
source box and bit tongs to rig floor.
629.0 629.0
2/18/2023
14:15
2/18/2023
15:15
1.00 INTRM4, TRIPCAS MPDA P Pull 4-1/2" RCD bearing and rack back
left on stand of DP f/629' to 534'.
629.0 534.0
2/18/2023
15:15
2/18/2023
21:30
6.25 INTRM4, TRIPCAS BHAH P L/D BHA as per SLB reps. Break out all
subs and XO's. Inspect reamer and bit.
XS2 Rhino Reamer had 2 chipped teeth
on BROOH edge. Bit Grade: 0-0-NO-A-
X-I-NO-TD
534.0 0.0
2/18/2023
21:30
2/18/2023
22:30
1.00 INTRM4, TRIPCAS BHAH P Clean and clear floor of BHA tools and
equipment.
0.0 0.0
2/18/2023
22:30
2/19/2023
00:00
1.50 INTRM4, TRIPCAS CLEN P Scrub and clean rig floor from wet OBM
trip. Prep rig floor for liner run.
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 65/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/19/2023
00:00
2/19/2023
01:00
1.00 INTRM4, CASING WWWH P M/U stack washer and flush stack.
Function annular and upper/lower pipe
rams and flush second time. R/D stack
washer. B/D top drive.
0.0 0.0
2/19/2023
01:00
2/19/2023
03:30
2.50 INTRM4, CASING RURD P R/U to run 7-5/8" liner. Double stack
tongs, hand slips and 7-5/8" handling
equipment. M/U 7-5/8" swage and
safety valve. PJSM on running liner.
0.0 0.0
2/19/2023
03:30
2/19/2023
09:15
5.75 INTRM4, CASING PUTB P M/U shoe track and check floats (good).
RIH picking up 7-5/8" 29.7# L-80 Hyd
523 Liner to 2,319'. Fill pipe with 11.5
ppg OBM via fill up hose. (Shoe track
Bakerlok'd to the pin of jt 8, M/U torque
11,900 ft/lbs)
0.0 2,319.0
2/19/2023
09:15
2/19/2023
12:00
2.75 INTRM4, CASING PUTB P R/U liner hanger shuttle. P/U 7-5/8" x 9-
7/8" Dril-Quip liner hanger extender
assy. R/D liner hanger shuttle.
2,319.0 2,319.0
2/19/2023
12:00
2/19/2023
12:15
0.25 INTRM4, CASING PUTB P Install liner wiper plugs on bottom of
hanger. M/U hanger to liner and RIH to
2,376'
2,319.0 2,376.0
2/19/2023
12:15
2/19/2023
12:45
0.50 INTRM4, CASING RURD P R/D liner running tools and equipment. 2,376.0 2,376.0
2/19/2023
12:45
2/19/2023
13:30
0.75 INTRM4, CASING PULD P P/U working single from pipe shed and
M/U bumper sub assy to top of liner
hanger and RIH to 2,421'
2,376.0 2,421.0
2/19/2023
13:30
2/19/2023
14:00
0.50 INTRM4, CASING CIRC P Break circulation with 63 gpm / 150 psi.
Fill pipe and confirm flow path thru liner
running tools is clear.
2,412.0 2,421.0
2/19/2023
14:00
2/19/2023
14:30
0.50 INTRM4, CASING PULD P L/D working single f/2,421' to 2,390'.
B/D top drive.
2,421.0 2,390.0
2/19/2023
14:30
2/19/2023
16:00
1.50 INTRM4, CASING MPDA P RIH 4-1/2" RCD bearing on first stand of
4-1/2" DP to 2,438'. Line up MPD
equipment and function test. Collect
T&D data. P/U wt 127k, S/O wt 121k,
ROT wt 120k, 30 rpm, 2-3 k ft/lbs trq.
2,390.0 2,438.0
2/19/2023
16:00
2/19/2023
17:30
1.50 INTRM4, CASING RUNL P RIH w/7-5/8" liner on 4-1/2" DP while
maintaining 13.0 ppg EMW f/2,438' to
3,434'.
2,438.0 3,434.0
2/19/2023
17:30
2/19/2023
17:45
0.25 INTRM4, CASING RURD P Remove master bushing and install PS-
21's.
3,434.0 3,434.0
2/19/2023
17:45
2/19/2023
23:30
5.75 INTRM4, CASING RUNL P RIH w/7-5/8" liner on 4-1/2" DP while
maintaining 13.0 ppg EMW f/3,434' to
8,526'. SIMOPS - Load 435 jts 4-1/2"
DP in pipe shed for next hole section.
3,434.0 8,526.0
2/19/2023
23:30
2/20/2023
00:00
0.50 INTRM4, CASING OWFF P OWFF (static). Draw down MPD back
pressure and shut down pump. SIMOPS
- PJSM on removing RCD bearing and
prep rig floor.
8,526.0 8,526.0
2/20/2023
00:00
2/20/2023
01:30
1.50 INTRM4, CASING MPDA P Pull 4-1/2" RCD bearing and remove
from DP. Install 5-7/8" bearing on first
stand of 5-7/8" DP to 8,570'. Function
test MPD equipment. Collect T&D data.
P/U wt 159 k, S/O wt 126 k, ROT wt 145
k , 30 rpm, 6-8 k ft/lbs trq
8,526.0 8,570.0
2/20/2023
01:30
2/20/2023
06:00
4.50 INTRM4, CASING RUNL P RIH 7-5/8" liner on 5-7/8" DP
maintaining 13.0 ppg EMW f/8,570' to
11971',. SIMOPS - Load 435 jts 4-1/2"
DP in pipe shed for next hole section.
8,570.0 11,971.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 66/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/20/2023
06:00
2/20/2023
06:30
0.50 INTRM4, CASING RUNL P RIH 7-5/8" liner on 5-7/8" DP
maintaining 13.0 ppg EMW F/11971' T/
12333',. SIMOPS - Load 435 jts 4-1/2"
DP in pipe shed for next hole section.
Monitor Displacement at pit #1, Filling
every joint and Topping off every 5
Stands.
11,971.0 12,333.0
2/20/2023
06:30
2/20/2023
06:45
0.25 INTRM4, CASING RUNL P Obtain Torque and Drag @ 12333' MD
prior to entering 9 7/8" liner top. P/U
206K S/O 155K @ 15 FPM RTW 182K
TQ 8-10K @ 30 RPM.
12,333.0 12,333.0
2/20/2023
06:45
2/20/2023
11:45
5.00 INTRM4, CASING RUNL P RIH 7-5/8" liner on 5-7/8" DP
maintaining 13.0 ppg EMW W/ MPD
f/12333' to 14786' Slow to 17 FPM @
14000' ,. SIMOPS - Load 435 jts 4-1/2"
DP in pipe shed for next hole section.
Monitor Displacement at pit #1, Filling
every joint and Topping off every 5
Stands.
12,333.0 14,786.0
2/20/2023
11:45
2/20/2023
12:00
0.25 INTRM4, CASING RUNL T Encountered a Restriction @ 14786'
W/30K Loss in hook load. P/U t/ 14774'
MD Attempt to RIH Encountered same
Restrictions @ 14786' 30K loss in hook
load.
14,786.0 14,786.0
2/20/2023
12:00
2/20/2023
12:30
0.50 INTRM4, CASING RUNL T Rotate @ 5 RPM 10K TQ 189 RTW
Ream Down F/ 14774' T/ 14803' MD
154K RTW Down, Stop Rotary @
14803' MD and Attempt to RIH . Loss
321 K Hook Load @ 14806 MD
14,786.0 14,806.0
2/20/2023
12:30
2/20/2023
13:30
1.00 INTRM4, CASING RUNL T Pull up T/ 14803' MD @ 5 RPM ,10-14K
TQ 187K RTW, Ream Down T/ 14807'
MD, Top Drive Stalled @ 20K & 130K
Hookload, Release torque , Pull up T/
14795' MD attempted second time with
same Results at same depth of 14807'
Release Torque Pull up T/ 14803' MD
14,806.0 14,803.0
2/20/2023
13:30
2/20/2023
13:45
0.25 INTRM4, CASING RUNL T Attempt T/ RIH w/ No Rotary F/ 14803'
T/ 14807' MD Set 50K down. Hook Load
100K Attempt 2 time with same result.
14,803.0 14,807.0
2/20/2023
13:45
2/20/2023
16:00
2.25 INTRM4, CASING RUNL T POOH T/ 14781' MD 250K P/U Consult
Town
14,807.0 14,781.0
2/20/2023
16:00
2/20/2023
16:15
0.25 INTRM4, CASING RUNL T Rotate Down @ 7 FPM. F/ 14781' T/
14844' MD @ 25 RPM, 12-14K TQ,
198K RTW 178K Rot Down Wt.
Observed WOB 5-7K, @ 14801' 27K
WOB, 14807' 20K WOB, 14811' 22K
WOB, 14814' 20K WOB, 14831' 18K
WOB, Torque Dropped T/ 10K Rot Down
Wt Increased T/ 182K @ 14844' MD
14,781.0 14,844.0
2/20/2023
16:15
2/20/2023
18:00
1.75 INTRM4, CASING RUNL P RIH 7-5/8" liner on 5-7/8" DP
maintaining 13.0 ppg EMW W/ MPD
F/14844 T/ 15770' MD',. Monitor
Displacement at pit #1, Filling every joint
and Topping off every 5 Stands. w/ 11.5
PPG mud.
14,844.0 15,770.0
2/20/2023
18:00
2/20/2023
21:45
3.75 INTRM4, CASING RUNL P RIH F/ 15770' MD T/ 17540' MD W/ 5
7/8" Liner on 5 7/8" DP Out of Derrick
SOW=165K
MPD maintain 13.0 PPG EMW Monitor
pipe Displacement at #1 pit. Fill Pipe
from #5 Pit. Fill pipe every Jt. and Top
off every 5 stands W 11.5 PPG mud
15,770.0 17,540.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 67/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/20/2023
21:45
2/20/2023
23:00
1.25 INTRM4, CASING OTHR P @ 17540' MD Stage Down MPD pump
and Trap Pressure, Offload 12.5 PPG
OBM F/ Pit #1 and #2 T/ Tank Farm,
Load Pits #4, #5, #7 W/ 11.5 PPG OBM
T/ continue RIH W/ Liner in Open hole.
17,540.0 17,540.0
2/20/2023
23:00
2/21/2023
00:00
1.00 INTRM4, CASING RUNL P RIH F/ 17540' MD T/ 17806' MD W/ 7
5/8" casing & TIW liner Hanger on 5 7/8"
DP out of Derrick, Drift last 29 Stands of
5 7/8" DP W/ 2.90" Drift. SOW 165K
MPD maintain 13.0 PPG EMW, Monitor
pipe Displacement at #1 Pit and Pipe
Displacement #5 Pit. Fill every jt. . Top
off every 5 Stands W/ 11.5 PPG OBM
MAgnet Weight for Past 24 Hrs= 1 LB
Formation losses last 24 hrs = 0
17,540.0 17,806.0
2/21/2023
00:00
2/21/2023
01:30
1.50 INTRM4, CASING RUNL P RIH F/ 17806' MD T/ 18408' MD W/ 7
5/8" casing & TIW liner Hanger on 5 7/8"
DP out of Derrick, Drift last 29 Stands of
5 7/8" DP W/ 2.90" Drift. SOW 165K
MPD maintain 13.0 PPG EMW, Monitor
pipe Displacement at #1 Pit and Pipe
Displacement #5 Pit. Fill every jt. . Top
off every 5 Stands W/ 11.5 PPG OBM
17,806.0 18,408.0
2/21/2023
01:30
2/21/2023
02:15
0.75 INTRM4, CASING CIRC P @ 18408' MD Verify Floats are clear @
1 BPM 765 psi Collect Torque and Dram
Values P/U 281K S/O 167K RTW 208K
W/ 30 RPM, TQ/21K MPD Maintain
13.0PPG ECD
18,408.0 18,408.0
2/21/2023
02:15
2/21/2023
06:15
4.00 INTRM4, CASING RUNL P RIH F/ 185408' MD T/ 20406' MD W/ 7
5/8" casing & TIW liner Hanger on 5 7/8"
DP out of Derrick, Drift last 29 Stands of
5 7/8" DP W/ 2.90" Drift. SOW 165K
MPD maintain 13.0 PPG EMW, Monitor
pipe Displacement at #1 Pit and Pipe
Displacement #5 Pit. Fill every jt. . Top
off every 5 Stands W/ 11.5 PPG OBM
18,408.0 20,406.0
2/21/2023
06:15
2/21/2023
07:00
0.75 INTRM4, CASING RUNL P P/U & M/U 30.85' Single off Top Stand
#220 From Drill pipe Tally. P/U and M/U
9.87' 5 7/8" Pup Jt. RIH F/ 20406' T/
20446' MD S/O 163K
20,406.0 20,446.0
2/21/2023
07:00
2/21/2023
07:30
0.50 INTRM4, CASING RUNL P M/U Top=Drive and P/U T/ 20439' MD
Break Over /PUW 284K and Tag Bottom
@ 20448' MD S/O W/ 10K P/U T/
20483' MD
20,446.0 20,448.0
2/21/2023
07:30
2/21/2023
08:00
0.50 INTRM4, CEMENT CIRC P @ 20438' MD Rotate @ 20 RPM, 215K
RTW 20K TQ & Circulate Staging
Pumps Up F/ 50 GPM & 450 PSI -
T/100 GPM & 800 PSI While Holding
Back Pressure W/ MPD. Once we Had
Returns, Shut off Rotary.
20,448.0 20,448.0
2/21/2023
08:00
2/21/2023
11:30
3.50 INTRM4, CEMENT CIRC P Circulate @ 100 GPM 750 PSI & Stage
pumps up per Circulation Schedule @
6500 Strokes Pumped, 214 GPM &
1076 PSI observed Losses @ 1 BPM,
Staged Flow Rate Down Attempting to
Match flow Out.
20,448.0 20,438.0
2/21/2023
11:30
2/21/2023
12:00
0.50 INTRM4, CEMENT CIRC P @ 1 BPM & 870 PSI Observed no
returns, Pumps 30 GPM @ 846 PSI
and Rotate @ 15 RPM, B/O Torque
38K, TQ= 20-24K Observe Little to No
Returns
20,438.0 20,438.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 68/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/21/2023
12:00
2/21/2023
14:15
2.25 INTRM4, CEMENT CIRC P Stage Pumps up F/ 30 GPM and 846
PSI T/ 42 GPM And 870 PSI While
Rotating @ 15 RPM and 23K TQ, Stage
Pump up T/ 51 GPM and 890 psi, Once
Full returns were Seen String Torque Up
and Stalled out @ 38K. Released
Torque and Staged Pumps Down to 30
GPM and 864 PSI W/ Little to No
returns. Consult with Engineers in Town.
20,438.0 20,438.0
2/21/2023
14:15
2/21/2023
15:00
0.75 INTRM4, CEMENT CIRC P Pump @ 30 GPM 865 psi, Rotate @ 25
RPM String Broke Free @ 39K TQ.
Stage Pumps up to 42 GPM and 870
20,438.0 20,438.0
2/21/2023
15:00
2/21/2023
15:15
0.25 INTRM4, CEMENT RUNL P RIH W/ No Pumps F/ 20438' to 20445'
MD S/O 138K
20,438.0 20,445.0
2/21/2023
15:15
2/21/2023
15:30
0.25 INTRM4, CEMENT RURD P Blow Down Top Drive, Change out
Elevators.
20,445.0 20,445.0
2/21/2023
15:30
2/21/2023
16:30
1.00 INTRM4, CEMENT RURD P PJSM, P/U Citadel Cement Head, M/U
Plug Valve while in Elevators & Still on
Skate
20,445.0 20,445.0
2/21/2023
16:30
2/21/2023
18:00
1.50 INTRM4, CEMENT RUNL P R/U Cement Hoses, Sensors & valves
T/ Cement Head.
20,445.0 20,445.0
2/21/2023
18:00
2/21/2023
20:45
2.75 INTRM4, CEMENT RUNL P PJSM, R/D Citadel Hydraulic 3" valve,
install 2" Block valve and High pressure
2" Cement Line and valves. Trouble
Shoot SLM Cement Pump. Prep Mud
Pits for Cement Job.
20,445.0 20,445.0
2/21/2023
20:45
2/21/2023
21:45
1.00 INTRM4, CEMENT CMNT P PJSM, Pump 60 BBLS 13.2 PPG Mud
Push, SLB Pump 5 BBLS H2O,
Pressure Test Lines T/ 3500 PSI @
21:15 hrs, Drop Lead Wiper Dart #1
Chase W/ 84 BBLS 15.8 PPG Cement
@ 4 BPM 790 PSi ( No Returns) @
21:40 Drop Tail Wiper Dart #2, Chase
W/ 20 BBLS H2O Swap T/ Rig Pumps
and Blow Down Cement Line T/ Cement
Unit.
20,445.0 20,445.0
2/21/2023
21:45
2/22/2023
00:00
2.25 INTRM4, CEMENT CMNT P Begin T/ Pump 11.5 PPG NAF W/ Rig
Pump W/ Rig Pump @ 2.5 BBL @ 660
PSI ( No Returns), @ 810 Strokes away
22:25 hrs, Drop BOZO Dart and
continue Chasing @ 2.5 BPM 948 PSI.
Increase T/ 3.5 BPM 1021 PSI ( Very
Minor Returns) Reduce Flow Rate @
2560 Strokes T/ 2 BPM 1035 PSI @
2715 Strokes, No Shear Indication of
Bottom With Dart Wiper #1
Total Losses to Formation For Past 24
Hrs 434 BBLS, Magnet Weight For Past
24 Hrs 1 LBS
20,445.0 20,455.0
2/22/2023
00:00
2/22/2023
01:00
1.00 INTRM4, CEMENT CMNT P No Indication of bottom Dart Shear. @
3,827 Strokes away Pressure increased
T/ 2,455 PSI Talked W/ Town Pressure
up T/ 2,800 PSI Observed pressure
Drop T/ 735 PSI W/ God Indication #2
Wiper Dart Latch Sheared
20,455.0 20,445.0
2/22/2023
01:00
2/22/2023
01:15
0.25 INTRM4, CEMENT THGR P Bump The plug on Time @ 2BPM 1,054
PSI @ 4,568 Strokes away, Pressure
up T/ 1,570
PSI F/ 5 MIN
20,445.0 20,445.0
2/22/2023
01:15
2/22/2023
02:30
1.25 INTRM4, CEMENT THGR P @ 20,445' MD Pressure up T/ 4400 PSI
@ Shear Setting Ring Pick up T/ 345K
W/ 75K
OverPull and Slack Back off T/ 135K .
TOL= 18,103' MD
20,445.0 20,445.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 69/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/22/2023
02:30
2/22/2023
03:15
0.75 INTRM4, CEMENT THGR P PJSM, R/U & Test Top of 7 5/8" T/ 2,000
PSI
20,445.0 20,445.0
2/22/2023
03:15
2/22/2023
04:45
1.50 INTRM4, CEMENT RURD P PJSM,Blow Down Cement Line and R/D
Cement Head as Per Citadel Rep.
20,445.0 20,445.0
2/22/2023
04:45
2/22/2023
05:00
0.25 INTRM4, CEMENT RURD P C/O Handling Equip.T/ 5 7/8" 20,445.0 20,445.0
2/22/2023
05:00
2/22/2023
05:30
0.50 INTRM4, CEMENT THGR P P/U T/ 271K Observe Break over
weight T/250K Confirm Expansion Pins
Shear
Presssure Up T/ 6,586 PSI & Blow
Ball/Seat Obtain returns to Shakers
20,445.0 18,103.0
2/22/2023
05:30
2/22/2023
06:00
0.50 INTRM4, CEMENT RURD P L/D 10' 5-7/8" Space Out Pup. 18,093.0 18,093.0
2/22/2023
06:00
2/22/2023
06:15
0.25 INTRM4, CEMENT RURD P Finish Breaking out Single L/D 10' Pup 18,093.0 18,061.0
2/22/2023
06:15
2/22/2023
06:30
0.25 INTRM4, CEMENT RURD P Line Up MP #4 Through MPD to Monitor
Well, B/D Top-Drive
18,061.0 18,061.0
2/22/2023
06:30
2/22/2023
07:00
0.50 INTRM4, CEMENT TRIP P M/U Stand #220 From Drilling BHA #6
Rack Back in Derrick
18,063.0 17,969.0
2/22/2023
07:00
2/22/2023
07:15
0.25 INTRM4, CEMENT OTHR P Change Bit Depth F/20405' to 18061'
BHA Length Changed F/2392.38'
T/49.00' Per TIW Liner REP. POOH on
Elevators F. 18601' T/ 17968' MD Drain
Stand For Pulling Bearing.
17,969.0 17,968.0
2/22/2023
07:15
2/22/2023
07:30
0.25 INTRM4, CEMENT RURD P Remove PS-21 Slips Install Master
Bushings
17,968.0 17,968.0
2/22/2023
07:30
2/22/2023
08:00
0.50 INTRM4, CEMENT OWFF P B/D Top-Drive Monitor Well PJSM. 17,968.0 17,968.0
2/22/2023
08:00
2/22/2023
09:00
1.00 INTRM4, CEMENT MPDA P PJSM Remove 5 7/8" MPD Bearing. 17,968.0 17,968.0
2/22/2023
09:00
2/22/2023
12:00
3.00 INTRM4, CEMENT CIRC P Install Wiper Ball, M/U Top-Drive
Circulate and Reciprocate F/ 17968'to
18063' @ 630 GPM
17,968.0 18,063.0
2/22/2023
12:00
2/22/2023
13:15
1.25 INTRM4, CEMENT CIRC P Install 2nd Wiper Ball After 1st B/U. Cont
Circulate and Reciprocate F/ 18063 to/
17968' @ 630 GPM Total Strokes
Pumped 28000.
18,063.0 17,968.0
2/22/2023
13:15
2/22/2023
13:45
0.50 INTRM4, CEMENT OWFF P B/D Top-Drive & monitor Well F/30 Min 17,968.0 17,968.0
2/22/2023
13:45
2/22/2023
14:30
0.75 INTRM4, CEMENT RURD P R/U For Casing Test 17,968.0 17,968.0
2/22/2023
14:30
2/22/2023
16:00
1.50 INTRM4, CEMENT PRTS P Test 7 5/8" Casing and Liner T/3500 PSI
F/ 30 Min Total Strokes Pumped 326
=32.6 BBLS Returned 31.5 BBLS
17,968.0 17,968.0
2/22/2023
16:00
2/22/2023
16:45
0.75 INTRM4, CEMENT RURD P R/D Casing Test Equip. Blow Down
Choke and Kill Lines.
17,968.0 17,968.0
2/22/2023
16:45
2/22/2023
17:15
0.50 INTRM4, CEMENT RURD P POOH on Elevators F/ 18061' to 17968'
Pull Master Bushing Install PS-21 Slips
PUW 265K Pull PS-21 due to offset at
rotary.
17,968.0 17,968.0
2/22/2023
17:15
2/22/2023
17:30
0.25 INTRM4, CEMENT CIRC P M/U Top-Drive & Pup Dry Job @ 6 BPM
@ 800 PSI.
17,968.0 17,968.0
2/22/2023
17:30
2/22/2023
18:00
0.50 INTRM4, CEMENT RURD P B/D Top-Drive Line Up on Trip Tank 17,968.0 17,968.0
2/22/2023
18:00
2/23/2023
00:00
6.00 INTRM4, CEMENT TRIP P POOH W/ TIW Running tools F/ 17968'
T/ 11845' RAcking Pipe Back in Derrick .
P/U 204K Monitoring Well ViaTrip Tank.
Formation Losses Last 24 hrs 303 BBLS
Magnet Weight 1.2 lb
17,968.0 11,845.0
2/23/2023
00:00
2/23/2023
06:00
6.00 INTRM4, CEMENT TRIP P POOH W/ TIW Running Tool W/ 4 1/2" x
5 7/8" F/ 11845' T/ 2408
11,845.0 2,408.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 70/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/23/2023
06:00
2/23/2023
06:30
0.50 INTRM4, CEMENT TRIP P Cont. POOH W 4 1/2" Drill Pipe F/ 2408'
T 2248' PUW 107K
2,408.0 2,248.0
2/23/2023
06:30
2/23/2023
07:00
0.50 INTRM4, CEMENT OWFF P Remove Master Bushing & Remove 2
Stripping Rubbers From Under
Bushings. Monitor Well F/ 10 Min Due to
Improper Hole Fill.
2,248.0 2,248.0
2/23/2023
07:00
2/23/2023
08:15
1.25 INTRM4, CEMENT TRIP P Cont. POOH W/ 4 1/2" DP F/ 2248' T/
237' MD
2,248.0 237.0
2/23/2023
08:15
2/23/2023
08:30
0.25 INTRM4, CEMENT OWFF P @ 237' Shut off hole Fill and Monitor
Well.
Well Static
237.0 237.0
2/23/2023
08:30
2/23/2023
09:00
0.50 INTRM4, CEMENT TRIP P Cont. POOH W/ 4 1/2" DP, F/ 237' T/ 60' 237.0 60.0
2/23/2023
09:00
2/23/2023
10:00
1.00 INTRM4, CEMENT BHAH P P/U Working Single T/ Cross over to
Hanger. POOH W/ Hanger. L/D Cross
over and Pup Jt.
60.0 0.0
2/23/2023
10:00
2/23/2023
12:00
2.00 INTRM4, CEMENT CLEN P Clean/Prep Hanger Running Tools For
Shipment & L/D skate
0.0 0.0
2/23/2023
12:00
2/23/2023
14:00
2.00 INTRM4, CEMENT CLEN P Clean and Clear Rig Floor of Oil Base
Mud Prior Cutting Drill Line
0.0 0.0
2/23/2023
14:00
2/23/2023
18:00
4.00 INTRM4, CEMENT SLPC P PJSM Hang Blocks, Slip and Cut 141.3'
Drill Line, Unhang Blocks Calibrate
Blocks and Check COM.
0.0 0.0
2/23/2023
18:00
2/23/2023
18:30
0.50 INTRM4, WHDBOP WWSP P P/U 2 Jts 5" Drill Pipe, M/U Wear
Bushing Puller RIH Pull Wear Bushing.
0.0 0.0
2/23/2023
18:30
2/23/2023
19:30
1.00 INTRM4, WHDBOP WWSP P Attempt to Drain Stack no able Due to
Wear Bushing Location.
0.0 0.0
2/23/2023
19:30
2/23/2023
20:30
1.00 INTRM4, WHDBOP WWSP P RIH Pull Wear Bushing With Out
Draining Stack. L/D Pulling Tools
0.0 0.0
2/23/2023
20:30
2/23/2023
21:00
0.50 INTRM4, WHDBOP WWWH P C/O Elevators and Pick-up 1 STD 5
7/8" Drill Pipe, M/U Stack Washer Tool
to Stand
0.0 0.0
2/23/2023
21:00
2/23/2023
23:30
2.50 INTRM4, WHDBOP WWWH P Cycle Annular, Upper and Lower VBR's ,
Flush BOPE W/ OBM . Drain BOPE,
Flush BOPE w/ Deep Clean, Drain
BOPE and Blow Down Top Drive, Kill
and Choke Lines.
Mobilize Testing Tools and Equip.
0.0 0.0
2/23/2023
23:30
2/24/2023
00:00
0.50 INTRM4, WHDBOP BOPE P P/U and M/U 5 7/8" Test Joint and Test
Plug
0.0 0.0
2/24/2023
00:00
2/24/2023
02:00
2.00 INTRM4, WHDBOP BOPE P P/U & M/U 5 7/8" Test Jt. and Test Plug ,
RIH and Set Test Plug. R/U BOP Test
Equipment and Fluid Pack lines.
0.0 0.0
2/24/2023
02:00
2/24/2023
12:00
10.00 INTRM4, WHDBOP BOPE P Perform BOPE Tests W/ 4 1/2" and 5
7/8" Test Jts, Annular 250L 5 MIn/
2500H 10Min on chart. Remaining Test
250L 5 Min 4000H 10 Min Charted,
Upper 4 1/2" X 7 5/8" VBRS, Lower 3
1/2" x 6 5/8" VBRS, CMV #1-#16
Manual & HCR Choke/KIll and Kill Valve
#3, Upper and Lower IBOPS, 5 7/8" and
6 5/8" TIW and Dart Valves, Blinds
Shears, Conduct Koomey Draw Down
Test ACC=3050 psi, MANIF=1500 psi
ACC= 1650 psi after all functions on
bottles, 26 Sec for 200 psi. Build W/ 2
Elec Pumps, 151 Sec T/ full System
pressure W/2 Elec and Air
Pumps.Closing Times Ann= 21 sec,
UPR=17 sec, Blind Shears=18 sec,
LPR=18 sec, Choke HCR=2 sec, Kill
HCR= 2 sec, Test PVT Gain /Loss and
Flow out Alarms. Test LEL and H2S
alarms Witness By AOGCC Rep Guy
Cook
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 71/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/24/2023
12:00
2/24/2023
19:30
7.50 INTRM4, WHDBOP BOPE T Found Leak On Door Seal Hinge Assy
on upper Rams. Drain Stack, Close
Blind Rams Power Down Koomey Unit.
Prep to Change Ram Door Hinge Assy.
Clean and Clear Rig Floor Prep to P/U
BHA #7, Replaced Upper Ram Door
Hinge seal Assy. Pressured up Koomey
System No Leaks.
0.0 0.0
2/24/2023
19:30
2/24/2023
20:00
0.50 INTRM4, WHDBOP BOPE T Set 4 1/2" Test Jt. as Per SOP Fill Stack
W/H2O Flood Surface Lines, Close
Upper VBRS. Notice Hydraulic Leak
Coming From Upper Ram Door Hinge
Assy.
0.0 0.0
2/24/2023
20:00
2/24/2023
21:00
1.00 INTRM4, WHDBOP BOPE T Drain Stack, Shut Blind Rams, Blow
Down Test Lines, Power Down Koomey,
Prep For Door Hinge Removal
0.0 0.0
2/24/2023
21:00
2/24/2023
23:30
2.50 INTRM4, WHDBOP BOPE T PJSM Remove Upper Ram Door ODS,
Inspect Hinge Coupling/ O-rings F/
Potential Leaks, Cont. Trouble Shoot
Hinge Leak.
0.0 0.0
2/24/2023
23:30
2/25/2023
00:00
0.50 INTRM4, WHDBOP BOPE T Energize Koomey Unit, Lower 5 7/8"
Test Jts, Function Test and Inspect
upper Pipe Ram Door Hinge For Leaks
Formation Losses 0 Magnet Weight 0
0.0 0.0
2/25/2023
00:00
2/25/2023
02:30
2.50 INTRM4, WHDBOP BOPE T Pressure up Accumulator, Observed
Door Hinge Leak, Remove Upper Pipe
ram door. Inspect and Found damaged
O-ring, Install New O-ring, Install Upper
ram door. function Test W/ Low 1500 psi
and High 3000 psi (No leaks)
0.0 0.0
2/25/2023
02:30
2/25/2023
03:15
0.75 INTRM4, WHDBOP BOPE P Fluid Pack Test Equipment , Test upper
4 1/2" x 7 5/8" VBRS W/ 4.5" Test Jt.
250L F/ 5 Min 4000H F/ 10 Min.
SIMOPS Mobilize BHA #7 to rig Floor as
Per SLB DD. Perform Derrick Inspection
0.0 0.0
2/25/2023
03:15
2/25/2023
03:45
0.50 INTRM4, WHDBOP RURD P R/D Test Equipment, Drain BOPE Pull
Test Plug and Blown Down Test Lines
0.0 0.0
2/25/2023
03:45
2/25/2023
05:00
1.25 INTRM4, WHDBOP WWSP P R/U and M/U Wear Bushing Running
Tool RIH Set Wear Bushing Screw in
Lock Down Pins as Per Cameron
Procedure. R/D Running Tool.
0.0 0.0
2/25/2023
05:00
2/25/2023
06:00
1.00 INTRM4, DRILLOUT BHAH P PJSM P/U BHA #7 as per SLB DD &
MWD F/ 0 to 66'
0.0 66.0
2/25/2023
06:00
2/25/2023
11:30
5.50 INTRM4, DRILLOUT BHAH P M/U BHA #7 F/ 66' To 213' Monitor
Returns Via PIT #1
66.0 213.0
2/25/2023
11:30
2/25/2023
12:00
0.50 INTRM4, DRILLOUT TRIP P RIH w/ 4.5" Drill Pipe F/ Shed F/ 213' to
685' P/U 94K Monitor Displacement Via
#1 Pit
213.0 685.0
2/25/2023
12:00
2/25/2023
15:00
3.00 INTRM4, DRILLOUT TRIP P RIH w/ 4.5" Drill Pipe F/ Shed F/ 685' to
3050' P/U 106K Monitor Displacement
Via #1 Pit
Filling Pipe Every 3000'
685.0 3,050.0
2/25/2023
15:00
2/25/2023
16:00
1.00 INTRM4, DRILLOUT CIRC P Fill Pipe, Shallow Test MWD Tools @
200 GPM 1402 PSI Blow Down Top
Drive (Good Shallow Hole test)
3,050.0 3,050.0
2/25/2023
16:00
2/25/2023
18:00
2.00 INTRM4, DRILLOUT TRIP P RIH w/ 4.5" Drill Pipe F/ Shed F/ 3050'
to 4600' P/U 124K Monitor
Displacement Via #1 Pit
Filling Pipe Every 3000'
3,050.0 4,600.0
2/25/2023
18:00
2/26/2023
00:00
6.00 INTRM4, DRILLOUT TRIP P RIH w/ 4.5" Drill Pipe F/ Shed F/ 4600'
to 8418' S/O 124K Monitor
Displacement Via #1 Pit
Filling Pipe Every 3000'
4,600.0 8,418.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 72/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/26/2023
00:00
2/26/2023
00:30
0.50 INTRM4, DRILLOUT TRIP P RIH w/ 4.5" Drill Pipe F/ Shed F/ 8418'
T/ 8718' MD S/O 121K Monitor
Displacement Via #1 Pit
Filling Pipe Every 3000' ( Swapped out
4 Jts of 4.5" DP)
8,418.0 8,718.0
2/26/2023
00:30
2/26/2023
01:15
0.75 INTRM4, DRILLOUT CIRC P @ 8718' MD Test MWD Tools 202 GPM
1631 PSI 3% F/O ( Blow Down Top-
Drive)
8,718.0 8,718.0
2/26/2023
01:15
2/26/2023
04:30
3.25 INTRM4, DRILLOUT TRIP P RIH w/ 4.5" Drill Pipe F/ Shed F/ 8718'T/
11496' MD S/O 121K Monitor
Displacement Via #1 Pit
Filling Pipe Every 3000' ( Swapped out
4 Jts of 4.5" DP)
8,718.0 11,496.0
2/26/2023
04:30
2/26/2023
05:00
0.50 INTRM4, DRILLOUT CIRC P @ 11496' MD Finished Picking Up
Singles, Test MWD Tools 202 GPM
1760 PSI 3% F/O ( Blow Down Top-
Drive) Prep to Run 4.5" Drill Pipe
Stands From Derrick
11,496.0 11,496.0
2/26/2023
05:00
2/26/2023
09:00
4.00 INTRM4, DRILLOUT TRIP P RIH w/ 4.5" Drill Pipe F/ Derrick
F/11496' T/ 16877' MD S/O 170K
Monitor Displacement Via #1 Pit
Filling Pipe Every 3000'
11,496.0 16,877.0
2/26/2023
09:00
2/26/2023
10:15
1.25 INTRM4, DRILLOUT DLOG P RIH Logging W/ Sonic F/ 16877' T/
17063' MD w/ 4.5" DP f/ Derrick
GPM=225, 2445 PSI, 6% F/O SOW
144K
16,877.0 17,063.0
2/26/2023
10:15
2/26/2023
10:45
0.50 INTRM4, DRILLOUT TRIP P RIH w/ 4.5" Drill Pipe F/ Derrick
F/17063' T/ 17355' MD S/O 141K
Monitor Displacement Via #1 Pit
17,063.0 17,355.0
2/26/2023
10:45
2/26/2023
12:00
1.25 INTRM4, DRILLOUT DLOG P RIH Logging W/ Sonic F/ 17355' T/
17590' MD w/ 4.5" DP f/ Derrick
GPM=225, 2445 PSI, 6% F/O SOW
147K C
17,355.0 17,590.0
2/26/2023
12:00
2/26/2023
14:30
2.50 INTRM4, DRILLOUT DLOG P RIH Logging W/ Sonic F/17063' T/
18084' MD w/ 4.5" DP f/ Derrick
GPM=225, 2445 PSI, 6% F/O SOW
147K Tag POB @ 18084' MD Set Down
10K P/U 210K S/O 145K
17,063.0 18,084.0
2/26/2023
14:30
2/26/2023
16:30
2.00 INTRM4, DRILLOUT DRLG P Drill Out POB F/18084' T/18100' MD W/
4.5" Drill Pipe RPM=70 TQ=12K
WOB=6-8 F/O=4% GPM 225 PSI=2566
Ream through 3X Drift Through 3x
Times
18,084.0 18,100.0
2/26/2023
16:30
2/26/2023
18:00
1.50 INTRM4, DRILLOUT DLOG P RIH Logging W/ Sonic F/ 18084' T/
18263' MD w/ 4.5" DP f/ Derrick
GPM=225, PSI= 2466 S/O 147K
18,084.0 18,263.0
2/26/2023
18:00
2/26/2023
20:00
2.00 INTRM4, DRILLOUT BKRM P Ream Up F/18263' T/ 18196' MD
RT=168K RPM-=30 WOB=8-12K
GPM=224 PSI=2457 F/O 3%
18,263.0 18,196.0
2/26/2023
20:00
2/26/2023
22:15
2.25 INTRM4, DRILLOUT TRIP P TOOH F/ 18196' T/ 16407' MD P/U
214K
18,196.0 16,407.0
2/26/2023
22:15
2/27/2023
00:00
1.75 INTRM4, DRILLOUT DLOG P RIH Logging W/ Sonic F/ 16407' T/
16689' MD w/ 4.5" DP F/ Derrick
GPM=225, PSI= 2445I, 6% F/O SOW
147K
No Losses last 24Hrs. Magnets Last @
24Hrs 2 Lbs
16,407.0 16,689.0
2/27/2023
00:00
2/27/2023
03:45
3.75 INTRM4, DRILLOUT DLOG P RIH Logging W/ Sonic F/ 16689' T/
17440' MD w/ 4.5" DP F/ Derrick
GPM=225, PSI= 2445I, 6% F/O SOW
147K
16,689.0 17,440.0
2/27/2023
03:45
2/27/2023
05:30
1.75 INTRM4, DRILLOUT WASH P Wash Down F/ 17440' T/ 18425' MD W/
4.5" Drill Pip Out Derrick S/O 141K P/U
216K GPM 20 PSI 760 F/O 2%
17,440.0 18,425.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 73/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
2/27/2023
05:30
2/27/2023
06:00
0.50 INTRM4, DRILLOUT REAM P @ 18425' Set Down Weight 10K x2,
Start To Ream Down @ 18425 F/ To
18477
18,425.0 18,477.0
2/27/2023
06:00
2/27/2023
12:00
6.00 INTRM4, DRILLOUT DLOG P RIH Logging W/ Sonic F/ 18477' T/
19803' MD w/ 4.5" DP F/ Derrick
GPM=225, PSI= 2600I, 4% F/O SOW
144K
18,477.0 19,803.0
2/27/2023
12:00
2/27/2023
14:00
2.00 INTRM4, DRILLOUT DLOG P RIH Logging W/ Sonic F/ 19803' T/
20126' MD w/ 4.5" DP F/ Derrick
GPM=225, PSI= 2600I, 4% F/O SOW
144K
19,803.0 20,126.0
2/27/2023
14:00
2/27/2023
18:00
4.00 INTRM4, DRILLOUT DRLG P Tag Top of Plugs @ 20126' Drill Upper
and Lower Plugs. GPM 225 PSI 2845
RPM 40-60 TQ 6-18K WOB 6-18K
Working Pipe as Needed
20,126.0 20,126.0
2/27/2023
18:00
2/28/2023
00:00
6.00 INTRM4, DRILLOUT DRLG P Cont. Drill F/ 20126' T/ 20177' MD Drill
Upper and Lower Plugs, Drill Dril-Quip
Landing Collar @ 20129' MD And
Cement As Directed By SLB DD. GPM
225, PSI 2845, RPM 40-60, TQ 6-18K,
WOB 6-18K Working Pipe as Needed
Formation Losses Last 24 Hrs. 0
Magnet Weight For past 24 HRs.
20,126.0 21,177.0
2/28/2023
00:00
2/28/2023
06:00
6.00 INTRM4, DRILLOUT DLOG P F/ 20177' T/ 20317' MD Ream Down
Cement Sonic Log Every Stand Drill
Down. GPM=200 PSI=2690. F/O 4%
RPM=40-70. TQ=11-19K. WOB=6-18K
Work Pipe as Needed.
20,177.0 20,317.0
2/28/2023
06:00
2/28/2023
11:00
5.00 INTRM4, DRILLOUT DLOG P F/20317' T/ 20390' MD Ream Down
Cement Sonic Log Every Stand Drill
Down. GPM=200 PSI=2690. F/O 4%
RPM=40-70. TQ=11-19K. WOB=6-18K
Work Pipe as Needed.
20,317.0 20,390.0
2/28/2023
11:00
2/28/2023
12:00
1.00 INTRM4, DRILLOUT RGRP P PJSM Install MPD Bearing, Change Out
MWD sensor on Top-Drive Goose Neck
20,390.0 20,390.0
2/28/2023
12:00
2/28/2023
13:30
1.50 INTRM4, DRILLOUT RGRP P Cont. Change Out MWD sensor on Top
-Drive Goose Neck. Clean Clear Rig
Floor. Isolate and Test Pulsation
Dampener on #2 Pump. No Test.
20,390.0 20,390.0
2/28/2023
13:30
2/28/2023
19:15
5.75 INTRM4, DRILLOUT CIRC P Displace Well W/ 10. PPG Flo Pro
GPM=250, PSI=2270, RPM=40,
TQ=13K F/O 5%, @ 6000 Strokes Drop
1.75" Well Commander Ball #1 to Open
Well Commander, Ball on Seat @ 8000
Strokes, Shear @ 2650 PSI
=,GPM=250, F/O 20% RPM=40, TQ=11.
Cont. Displacement W/ Well
Commander Open GPM=600 PSI=2614
Flow=20% Total Strokes Pumped
29,461, Total Interface 450 BBLS
20,390.0 20,390.0
2/28/2023
19:15
2/28/2023
19:45
0.50 INTRM4, DRILLOUT OWFF P @ 20366' MD Perform Casing in Flow
Gas Test F/ 11.1 PPG to 10. PPG EMW
(Static)
20,366.0 20,366.0
2/28/2023
19:45
3/1/2023
00:00
4.25 INTRM4, DRILLOUT CLEN P Clean and Transfer all 11.0 PPG NAF
F/ Mud Pits, Onload 10.PPG Flo Pro To
Pits , Prep Mud Pits Drill Out Casing
Shoe
20,366.0 20,366.0
3/1/2023
00:00
3/1/2023
00:45
0.75 INTRM4, DRILLOUT CLEN P Clean and Transfer all 11.0 PPG NAF
F/ Mud Pits, Onload 10.PPG Flo Pro To
Pits , Prep Mud Pits Drill Out Casing
Shoe
20,366.0 20,366.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 74/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/1/2023
00:45
3/1/2023
01:30
0.75 INTRM4, DRILLOUT CIRC P Pump 1.75" Steel Ball #2 W/ GPM =250
PSI=600 To Cycle Well Commander
Closed,
Ball on Seat And Shift Closed 1775
Strokes, PSI 2547, W/ Communication
to MWD Tools.
20,366.0 20,366.0
3/1/2023
01:30
3/1/2023
01:45
0.25 INTRM4, DRILLOUT CIRC P Establish Parameters W/ MPD T/
Maintain 11.1PPG EMW.
20,366.0 20,366.0
3/1/2023
01:45
3/1/2023
06:00
4.25 INTRM4, DRILLOUT DRLG P Drill Cement F/ 20366' T/ 20399" Tag 7
5/8" Shoe @ 20397' MD Set Down 10-
15K X2, RTW=165K, RPM=40-60,
TQ=13-18K, GPM=200-225, PSI=1644-
1850, MAintain 11.1 PPG EMW W/ MPD
20,366.0 20,399.0
3/1/2023
06:00
3/1/2023
08:45
2.75 INTRM4, DRILLOUT DRLG P Drill Cement And Shoe Track F/20399'
T/ 20448' GPM=250, PSI=2142,
RPM=70 TQ=17K WOB= 12-17K, F/O
6% MAintain 11.1 PPG EMW W/ MPD
20,399.0 20,448.0
3/1/2023
08:45
3/1/2023
09:45
1.00 INTRM4, DRILLOUT DDRL P Drill 6 3/4" Production Hole F/ 20448' T/
20468' GPM=250, PSI=2142, RPM=70
TQ=17K WOB= 12-17K, F/O 6%
MAintain 11.1 PPG EMW W/ MPD
20,448.0 20,468.0
3/1/2023
09:45
3/1/2023
10:15
0.50 INTRM4, DRILLOUT BKRM P BROOH F/ 20468' T/ 20365' GPM=250,
PSI=2142, RPM=70 TQ=17K WOB= 12-
17K, F/O 6% MAintain 11.1 PPG EMW
W/ MPD
20,468.0 20,365.0
3/1/2023
10:15
3/1/2023
10:30
0.25 INTRM4, DRILLOUT MPDA P Perform Draw Down Test W/ MPD Shut
Down Pump and Monitor Pressure on
MPD Chokes, Pressure Build to 877 PSI
- Determine Formation Pressure 11.19
EMW
20,365.0 20,365.0
3/1/2023
10:30
3/1/2023
12:00
1.50 INTRM4, DRILLOUT CIRC P Stage Up Pumps T/ GPM=225,
PSI=2333, Maintain 895 PSI W/PD
Circulate B/U Holding 12.55 ECD 4200
Strokes Pumped @ 1200 Hrs
20,365.0 20,365.0
3/1/2023
12:00
3/1/2023
18:00
6.00 PROD1, DRILL CIRC P Cont. Circulate B/U Through Gas Buster
@ 225 GPM, PSI=2344, Maintain 895
PSI MPD Holding 12.55 ECD, 21643
Total Strokes Pumped @ 1800Hrs
20,365.0 20,365.0
3/1/2023
18:00
3/1/2023
20:15
2.25 PROD1, DRILL MPDA P Perform Draw Down Test W/ MPD F/
12.55 EMW T/11.PPG EMW Monitor
Volume Bleed to Trip Tank #2.
20,365.0 20,365.0
3/1/2023
20:15
3/1/2023
23:15
3.00 PROD1, DRILL CIRC P Pump @ 1/2 BPM T/ Bum,p Floats
Open on Drill Pipe, Observe Floats
Opening @ 402 PSI W/ MPD=870 PSI
( 12.35 PPG EMW) Monitor Pressure
While Discussing W/ Town On Plan
Forward.
20,365.0 20,365.0
3/1/2023
23:15
3/2/2023
00:00
0.75 PROD1, DRILL CIRC P @ 20365' MD Circulate B/U Through
Mud Gas Separator, Stage Up flow Rate
T/ 250 GPM. PSi=2610, Maintain 12.5
PPG EMW W/ MPD
20,365.0 20,365.0
3/2/2023
00:00
3/2/2023
06:00
6.00 PROD1, DRILL CIRC P @ 20365' MD Circulate B/U Through
Mud Gas Separator, Stage Up flow Rate
T/ 250 GPM. PSi=2610, Maintain 12.5
PPG EMW W/ MPD Total Strokes
Pumped 22882
20,365.0 20,365.0
3/2/2023
06:00
3/2/2023
06:45
0.75 PROD1, DRILL RURD P Shut Down Pumps, Trap 12.5 PPG
EMW/ W/MPD, Blow Down, Top-Drive,
R/U Head Pin and High Pressure Hose.
20,365.0 20,365.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 75/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/2/2023
06:45
3/2/2023
12:00
5.25 PROD1, DRILL MPDA P Pump Down Drill Pipe @ 1/2 BPM Open
Floats Conduct Draw Down Test W/
MPD, Begin W/ 12.5 PPG EMW T/ 11.5
PPG EMW @ 10 Min Intervals, Let
Pressure Build, Final Pressure 978 PSI
Start with 918psi on Annulus.
Icrementally bleed down 100psi and
hold for 10minutes
918-736psi Build to 755psi in 10min
755-655psi Build to 668psi in 10min
668-568psi Build to 727psi in 10min
727-627psi Build to 747psi in 10 min
747-648psi Build to 975psi and flat line
in 2.5hrs
Total volume bled back 2.3bbls
20,365.0 20,365.0
3/2/2023
12:00
3/2/2023
14:00
2.00 PROD1, DRILL MPDA P Conduct 2nd Draw Down Test W/ MPD,
Begin W/ 12.5 PPG EMW T/ 11.5 PPG
EMW @ 10 Min Intervals, Final
Pressure 765PSI R/D Head Pin and
High Pressure Hose.
952-842psi Build to 865psi in 10min
865-756psi Build to 785psi in 10min
785-649psi Build to 685psi in 10min
685-588psi Build to 668psi in 10min
668-588psi Build to 656psi in 10min
656-591psi Build to 639psi in 10min
639-594psi Build to 762psi in 30min
Volume bled back 3.2bbls
20,365.0 20,365.0
3/2/2023
14:00
3/2/2023
20:45
6.75 PROD1, DRILL CIRC P Circulate and Recip. F/ 20355' to 20365'
MD GPM=250 PSi=2680, F/O 2%
RPM=40 TQ=12K RTW=158K, Maintain
12.5 PPG EMW W/ MPD
Bottoms up mud wight came back as
high as 10.5+ added water to maintain
10ppg.
Max 391 gas units on Bottoms up.
20,365.0 20,365.0
3/2/2023
20:45
3/3/2023
00:00
3.25 PROD1, DRILL CIRC P @ 20365' MD Circulate and Monitor
Fluid Levels and Mud Properties @
GPM=250 PSI=2680 F/O 3% Maintain
12.5 PPG EMW W/ MPD
While Building 11.1 PPG FloPro @ mud
Plant
Formation Losses 0 Magnet Weight 1/2
LB
20,365.0 20,365.0
3/3/2023
00:00
3/3/2023
06:30
6.50 PROD1, DRILL CIRC T @ 20365' MD Circulate and Monitor
Fluid Levels and Mud Properties @
GPM=250 PSI=2680 F/O 3% Maintain
12.5 PPG EMW W/ MPD
While Building 11.1 PPG FloPro @ mud
Plant
Formation Losses 0 Magnet Weight 0
LB
20,365.0 20,365.0
3/3/2023
06:30
3/3/2023
08:00
1.50 PROD1, DRILL CIRC T Shut down pumps and trap 925psi
(12.5EMW) with MPD. Rig up head pin
to monitor drill pipe pressure and blow
down Top Drive.
Flush chokes and blow down same.
Recover cement plug material in
chokes.
20,365.0 20,365.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 76/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/3/2023
08:00
3/3/2023
10:00
2.00 PROD1, DRILL OWFF T Conduct a drawdown test monitoring the
Drill Pipe and Annulus. Pump down drill
string to bump floats and begin draw
down monitored on Trip Tank 2 every
10min.
Annulus
865-745psi Build Pressure to 760psi
760-661psi Build Pressure to 685psi
685-577psi Build Pressure to 627psi
627-511psi Build Pressure to 587psi
587-475psi Build Pressure to 917psi in
45min
Gained 3.2bbls
20,365.0 20,365.0
3/3/2023
10:00
3/3/2023
14:45
4.75 PROD1, DRILL CIRC T @ 20365' MD Circulate and Monitor
Fluid Levels and Mud Properties @
GPM=250 PSI=2667 F/O 3% Maintain
12.5 PPG EMW W/ MPD
While Building 11.1 PPG FloPro @ mud
Plant
Formation Losses 0 Magnet Weight 0
LB
20,365.0 20,365.0
3/3/2023
14:45
3/3/2023
22:45
8.00 PROD1, DRILL CIRC T Shut down pumps and trap 931psi, line
up to Coriolis meter on MPD manifold.
Bring pumps back on line 225gpm
2178psi maintain a 12.5EMW as per
MPD with 763psi on back side.
Begin Dynamic Draw Down Test
Incrementally coming down .1ppg at a
time starting with a 12ppg ECD to 10.1
ECD monitor pit levels and Coriolis for
signs of gain/flow. Total Gain 22 BBLS
@ 10.1 ECD well was Static No Gain
MPD choke open to 100% For 30 Min,
No Gain
20,365.0 20,365.0
3/3/2023
22:45
3/4/2023
00:00
1.25 PROD1, DRILL OWFF T Shut Well at MPD Chokes Monitor
Press, Pressure Increase F/ 0 PSI to
617 PSI In 1.25 Hrs. Pressure Still
increasing slowly
15 Min =128 PSi
30 Min= 254 PSI
45 Min=514 PSI
60 Min=594 PSI
2400 HRS= 617 PSI
20,365.0 20,365.0
3/4/2023
00:00
3/4/2023
01:00
1.00 PROD1, DRILL OWFF T Monitor shut in casing pressures against
the MPD choke. Pressure stabilize at
736psi with mud weight 9.6+ppg.
20,365.0 20,365.0
3/4/2023
01:00
3/4/2023
08:30
7.50 PROD1, DRILL CIRC T Circulate to check bottoms up. Pump
22,423 STKS. Observed 9.6+ coming
out of hole. 223 Units Gas
225 GPM
2414 PSI
40 RPM
13K TQ
12.43 ECD
160K ROT
No gains or losses
20,365.0 20,365.0
3/4/2023
08:30
3/4/2023
11:00
2.50 PROD1, DRILL DISP T Shut down trap at 920 PSI w/ 9.7 PPG
MW 12.2 PPGE. Empty pits 4& 5 of
10PPG Flo Pro & clean same.
Take on 11.1 PPG Flo Pro into pits.
Stabbed TIW Valve
Blow down Top Drive & Service same.
Conduct PJSM w/ crew on displacement
20,365.0 20,365.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 77/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/4/2023
11:00
3/4/2023
19:45
8.75 PROD1, DRILL DISP T Begin displacement from 10 PPG Flo
Pro to 11.1 PPG.
Pump 50 BBl of 11.1 PPG 300 Vis
Spacer @ 250 GPM, 2400 PSI, RPM +
40, TQ= 13K.
34364 STKS Pumped.
Maintain 12.5 PPGE w/ MPD Choke
throughout circulation.
20,365.0 20,365.0
3/4/2023
19:45
3/4/2023
20:15
0.50 PROD1, DRILL RURD T B/D Top Drive R/U for FIT Test 20,365.0 20,365.0
3/4/2023
20:15
3/4/2023
21:15
1.00 PROD1, DRILL FIT T Perform FIT Test To a 12.5 PPG EMW=
520 PSI, 11.1ppg mud @ 20 GPM. Total
Strokes Pumped 34= 3.4 BBLS, Shut
Down Mud Pump, Shut in Well Monitor
Pressure For 10 Min. Charted
20,365.0 20,365.0
3/4/2023
21:15
3/5/2023
00:00
2.75 PROD1, DRILL OWFF T Line Up To Exhale and Bleed pressure
back to Trip Tank #2 1.8 bbls in Trip
Tank Bleed Back 520 PSI 3.4 BBLS
Fluid bleed back. Start With 1.8 BBLS in
Trip Tank. Logging Every 1/2 BBL Bleed
Back and time to a total of 7 bbls.
20,365.0 20,365.0
3/5/2023
00:00
3/5/2023
03:30
3.50 PROD1, DRILL OWFF T Continue to perform Exhale Test with
11.1ppg mud.
Monitor flow back on Trip Tank 2 until
10bbls out reached.
20,365.0 20,365.0
3/5/2023
03:30
3/5/2023
04:00
0.50 PROD1, DRILL OWFF T Close choke and monitor pressure build
up.
Built 25psi in 30minutes
20,365.0 20,365.0
3/5/2023
04:00
3/5/2023
08:00
4.00 PROD1, DRILL OWFF T Open choke and continue with Exhale
Test monitoring on Trip Tank #2. Bleed
back 3bbls more in 4 hours. Conclude
test after determined well was breathing.
20,365.0 20,365.0
3/5/2023
08:00
3/5/2023
09:00
1.00 PROD1, DRILL OTHR T Blow down surface lines.
Rig down TIW and Head pin.
Kelly up and break circulation.
Capture slow pump rates.
20,365.0 20,365.0
3/5/2023
09:00
3/5/2023
09:30
0.50 PROD1, DRILL DLOG T Log Down with Sonic Tool Real Time
F/20,366'-20,468'
350ft/hr
250gpm
2070psi
5rpm
11k Tq
F/O 3%
Rot Wt 182k
20,366.0 20,468.0
3/5/2023
09:30
3/5/2023
11:15
1.75 PROD1, DRILL DDRL P Drill 6-3/4" production hole F/ 20,468'
T/20,542' 7,136'TVD
275gpm
2,505psi
120rpm
22k Tq
F/O 4%
11.67PPG ECD
Rot wt 171k
16-20 wob
20,468.0 20,542.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 78/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/5/2023
11:15
3/5/2023
12:00
0.75 PROD1, DRILL SIPB T 11:19hrs observe 130psi increase in
pump pressure and flow increase to
18%.
Shut down pumps and rotary and close
MPD chokes to access well bore
condition. Observe casing pressure
come up to 478psi and Drill Pipe
pressure at 545psi.
Check pits and calculate a 3bbl gain.
11.1ppg mud in the pits.
Notify town with data gathered.
20,542.0 20,542.0
3/5/2023
12:00
3/5/2023
19:00
7.00 PROD1, DRILL CIRC T Establish circulation keeping casing
pressure constant at 478psi while
coming up with the pumps to 225gpm.
Once at circulating rate maintain
constant DP pressure of 2,350psi.
Rotate pipe at 30rpm 15k Tq and
reciprocate F/ 20,519' T/20,470'.
Rot Wt 167klbs ECD12.8ppge
Pump 25,136stks
No gas on bottoms up. Collect sample
of fluid and annylize with retort observe
increase in oil content from 1% to 4%
20,519.0 20,470.0
3/5/2023
19:00
3/5/2023
20:30
1.50 PROD1, DRILL BKRM T BROOH F/ 20470' T/ 20367' MD W/
GPM=225, PSI=2360, RPM=40,
TQ=10K, ECD=12.8, PPG, RTW=162K
20,470.0 20,367.0
3/5/2023
20:30
3/5/2023
21:00
0.50 PROD1, DRILL CLEN T Blow Down Top-Drive, Install Head Pin
and High Pressure Hose.
20,367.0 20,367.0
3/5/2023
21:00
3/5/2023
22:00
1.00 PROD1, DRILL OWFF T Perform Exhale Test #1 Starting
Pressure 623 psi Bleed Back 10 BBLS
Via MPD Choke W/ 15% Open Bleed
Time 52 min Ending Pressure 482 psi
20,367.0 20,367.0
3/5/2023
22:00
3/5/2023
22:30
0.50 PROD1, DRILL OWFF T Close MPD Choke Monitor Pressure
Build for 30 Min Pressure Build F/ 482
psi to 548 psi
20,367.0 20,367.0
3/5/2023
22:30
3/5/2023
23:00
0.50 PROD1, DRILL OWFF T Perform Exhale Test #2 Starting
Pressure 548 psi Bleed Back 10 BBLS
Via MPD Choke W/ 15% Open Bleed
Time 30 min Ending Pressure 393 psi
20,367.0 20,367.0
3/5/2023
23:00
3/5/2023
23:30
0.50 PROD1, DRILL OWFF T Close MPD Choke Monitor Pressure
Build for 30 Min Pressure Build F/ 393
psi to 478 psi
20,367.0 20,367.0
3/5/2023
23:30
3/6/2023
00:00
0.50 PROD1, DRILL OWFF T Perform Exhale Test #3 Starting
Pressure 478 psi Bleed Back 7.5 BBLS
Via MPD Choke W/ 15% Open Bleed
Time 30 min @ 0000 Hrs
W/ 315 psi. Total Bleed Back 44 BBLS
*Determined Well was Breathing*
20,367.0 20,367.0
3/6/2023
00:00
3/6/2023
00:15
0.25 PROD1, DRILL OWFF T Continue to perform Exhale test #3.
Starting pressure 478psi bled 10bbls off
down to 283psi. Used 15% chokes
20,367.0 20,367.0
3/6/2023
00:15
3/6/2023
00:45
0.50 PROD1, DRILL OWFF T Close MPD Choke and monitor build up
in pressure on Annulus. Built from
283psi to 400psi
20,367.0 20,367.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 79/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/6/2023
00:45
3/6/2023
09:00
8.25 PROD1, DRILL CIRC T Circulate bottoms up to assess the
Exhale test.
Rotate and Reciprocate while
circulating. Take returns through MGS.
225gpm
2,400psi
40 rpms
12k tq
12.8ppg ECD holding 487psi with MPD
Pumped 25,400stks
B/U Showed an increase in oil
concentration
Kuparuk Lab ran a GC and confirmed oil
in sample was LVT.
20,367.0 20,367.0
3/6/2023
09:00
3/6/2023
09:30
0.50 PROD1, DRILL OWFF T Trap 580psi with an 11.1ppg for a
12.6ppge.
Blow down Top Drive and rig up TIW
and Head pin.
Line up to take returns to TT#2
20,367.0 20,367.0
3/6/2023
09:30
3/6/2023
10:15
0.75 PROD1, DRILL OWFF T Conduct Exhale test #4
Start pressure at 555psi bleed back
20bbls with 21% open MPD choke.
Ending pressure 186psi
20,367.0 20,367.0
3/6/2023
10:15
3/6/2023
10:45
0.50 PROD1, DRILL OWFF T Close MPD chokes and pressure up
from 186psi to 360psi in 30min.
20,367.0 20,367.0
3/6/2023
10:45
3/6/2023
13:45
3.00 PROD1, DRILL OWFF T Conduct Exhale test #5.
Starting pressure 360psi being with 21%
choke and ended wide open opening
chokes to continue to allow to flow.
Monitor returns to the Trip Tank #2 flow
diminished to less than 3bbl/hr. Final
pressure on annulus 12psi with open
choke. Final measurement was 3bph
return rate
20,367.0 20,367.0
3/6/2023
13:45
3/6/2023
15:45
2.00 PROD1, DRILL OWFF T Close orbit and line up to RCD drain line
and measure returns back with vis cup
calculation.
Start at 3bph and end at 1.78bbl/hr Total
Barrels Bleed Back 44 BBLS
20,367.0 20,367.0
3/6/2023
15:45
3/6/2023
16:00
0.25 PROD1, DRILL SVRG T Rig Down Floor Equipment, Service Top
-Drive, Prepare to Circulate
20,367.0 20,367.0
3/6/2023
16:00
3/6/2023
22:30
6.50 PROD1, DRILL CIRC T Circulate and Condition Mud while
Rotating F/ 20362' To 20272' MD GPM-
225, PSI=1901, RPM=50, TQ=15K,
F/O=2%,ECD=11.6, RTW=178K, 20500
Strokes pumped Total.
20,362.0 20,272.0
3/6/2023
22:30
3/7/2023
00:00
1.50 PROD1, DRILL WASH T Wash and Ream Down F/ 20362' MD T/
20481' MD
20,362.0 20,481.0
3/7/2023
00:00
3/7/2023
00:30
0.50 PROD1, DRILL REAM T Wash &Ream Down F/20,481' MD
T/20,542' MD, RTW=183K,
RPM=50 ,TQ=17K, WOB=1,
FLOW=4% ,GPM=252 ,PSI=2329
20,481.0 20,542.0
3/7/2023
00:30
3/7/2023
05:45
5.25 PROD1, DRILL DDRL P Drill 6 3/4" Production Hole and Log
F/20,542' MD - T/20,645' MD 7137‘
TVD, WOB =
11K, GPM =250, PSI On =2408, PSI Off
=2386, RPM = 120, TQ On = 24K, TQ
Off = 17K, F/O
=6%, ECD = 11.7PPG, P/U WT = 240K,
S/O WT = 160K, RT WT = 183K
20,542.0 20,645.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 80/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/7/2023
05:45
3/7/2023
12:00
6.25 PROD1, DRILL DDRL P Drill 6 3/4" Production Hole F/20,645'
MD - T/20,928' MD, 7,142‘ TVD, WOB =
2-4K
GPM = 260, PSI = 2518, RPM = 150,
TQ ON = 26K, F/O = 3%, ECD = 11.91
PPG
P/U WT = 260K, S/O WT = 149K, RT
WT = 179K, ADT = 5.55, Total Bit Hrs =
10.49
SPR’S @ 20,551’ MD, 7,135' TVD MW
= 11.1PPG Time:0120
#2 MP – 20 SPM 665-PSI 30 SPM - 910
-PSI
#3 MP – 20 SPM 615-PSI 30 SPM - 905
-PSI
20,645.0 20,928.0
3/7/2023
12:00
3/7/2023
18:00
6.00 PROD1, DRILL DDRL P Drill 6 3/4” Production Hole F/20,928'
MD - T/21,048' MD 7,140‘ TVD, WOB =
1-3K
GPM = 260, PSI = 2535, RPM = 150,
TQ = 26K, F/O = 3%, ECD = 11.78
PPG,
P/U WT = 260K, S/O WT = 149K, RT
WT = 174K, ADT = 3.84, Total Bit Hrs =
14.33
20,928.0 21,048.0
3/7/2023
18:00
3/8/2023
00:00
6.00 PROD1, DRILL DDRL P Drill 6 3/4” Production Hole F/21,048’
MD - T/21,203’ MD 7141’ TVD, WOB =
4K, GPM =
260, PSI On = 2531, PSI Off =2527,
RPM =150, TQ On = 26, TQ Off = 25,
F/O = 3%,
ECD =11.82 PPG, P/U WT =250K, S/O
WT =131K, RT WT = 183K, ADT = 5.09,
Total Bit Hrs
=19.42,
SPR’S @ 21,016’ MD, 7,142' TVD MW
= 11.1PPG TIME:15:24
#2 MP – 20 SPM, 700 PSI, 30 SPM
1010 PSI
#3 MP – 20 SPM 690 PSI, 30 SPM 960
PSI
3LB Metal F/ Ditch Magnets
21,048.0 21,203.0
3/8/2023
00:00
3/8/2023
06:00
6.00 PROD1, DRILL DDRL P Drill 6-3/4" production hole from 21,203'
to 21,244' MD 7142’ TVD,
Control drilling at reduced ROP in order
to facilitate drop through hard siderite
layer with 100% down.
Samples have continued to be
predominantly mud additive and very
few loose sand grains with very rare
glauconite.
WOB = 4K, GPM = 260 PSI On = 2531,
PSI Off =2527, RPM =150, TQ On = 26,
TQ Off = 25, F/O = 3%,
ECD =11.82 PPG, P/U WT =250K, S/O
WT =131K, RT WT = 183K, ADT = 5.09,
Total Bit Hrs =25.40,
21,203.0 21,244.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 81/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/8/2023
06:00
3/8/2023
12:00
6.00 PROD1, DRILL DDRL P Drill 6-3/4" production hole from 21,244'
to 21,273' MD 7144’ TVD,
Continue control drilling at reduced ROP
in order to facilitate drop through hard
siderite layer with 100% down.
Samples have continued to be
predominantly mud additive and very
few loose sand grains with very rare
glauconite.
WOB = 1-3K, GPM = 260 PSI On =
2501, RPM =80, TQ On = 24, F/O =
3%,
ECD =11.71 PPG, P/U WT =234K, S/O
WT =134K, RT WT = 180K, ADT = 6.07,
Total Bit Hrs ,31.47
21,244.0 21,273.0
3/8/2023
12:00
3/8/2023
18:00
6.00 PROD1, DRILL DDRL P Drill 6-3/4" production hole from 21,273'
to 21,304' MD 7147’ TVD,
Continue control drilling at reduced ROP
in order to facilitate drop through hard
siderite layer with 100% down.
Material coming across shakers is
primarily mud additive with rare to trace
sandstone and siltstone cuttings..
WOB = 1-2K, GPM = 260 PSI On =
2405, RPM =70, TQ On = 21, F/O =
3%,
ECD =11.64 PPG, P/U WT =234K, S/O
WT =134K, RT WT = 180K, ADT =4.83 ,
Total Bit Hrs 36.30 ,
21,273.0 21,304.0
3/8/2023
18:00
3/8/2023
21:00
3.00 PROD1, DRILL DDRL P Drill 6-3/4" production hole from 21,273'
to 21,304' MD 7147’ TVD,
Continue control drilling at reduced ROP
in order to facilitate drop through hard
siderite layer with 100% down.
Material coming across shakers is
primarily mud additive with rare to trace
sandstone and siltstone cuttings..
WOB = 1-2K, GPM = 260 PSI On =
2405, RPM =70, TQ On = 21, F/O =
3%,
ECD =11.64 PPG, P/U WT =234K, S/O
WT =134K, RT WT = 180K, ADT =3.21 ,
Total Bit Hrs 39.51 ,
21,273.0 21,304.0
3/8/2023
21:00
3/9/2023
00:00
3.00 PROD1, DRILL DDRL P Circulate, Rotate, Recip, Troughing F/
21306' MD T/ 21288' MD WOB = 1-2K,
GPM = 260 PSI On = 2405, RPM =70,
TQ On = 21, F/O = 3%,
ECD =11.64 PPG, P/U WT =234K, S/O
WT =134K, RT WT = 180K, ,
Total Bit Hrs 42.51 ,
21,304.0 21,288.0
3/9/2023
00:00
3/9/2023
06:00
6.00 PROD1, DRILL DDRL P Drill 6-3/4" production hole from 21,307'
to 21,310' MD 7146’ TVD,
Continue control drilling at reduced ROP
in order to facilitate drop through hard
siderite layer with 100% down.
Material coming across shakers is
primarily mud additive with rare to trace
sandstone and siltstone cuttings. WOB
= 1K, GPM = 258, PSI On = 2400, RPM
=80, TQ On = 23, F/O = 3%, ECD
=11.66 PPG, RT WT = 188K, Total Bit
Hrs 43.61, ADT= 4.10,
21,307.0 21,310.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 82/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/9/2023
06:00
3/9/2023
12:00
6.00 PROD1, DRILL DDRL P Drill 6-3/4" production hole from 21,310'
to 21,387' MD 7150’ TVD,
Continue control drilling at reduced ROP
in order to facilitate drop through hard
siderite layer with 100% down.
Material coming across shakers is
primarily mud additive with rare to trace
sandstone and siltstone cuttings. WOB
= 5K, GPM = 250, PSI On = 2341, RPM
= 75, TQ On = 25, F/O = 3%, ECD
=11.62 PPG, RT WT = 183K, Total Bit
Hrs 49.42, ADT= 5.81.
21,310.0 21,387.0
3/9/2023
12:00
3/9/2023
21:00
9.00 PROD1, DRILL DDRL P Drill 6-3/4" production hole from 21,387'
to 21,560' MD 7,148’ TVD,
Continue control drilling at reduced ROP
in order to facilitate drop through hard
siderite layer with 100% down.
Material coming across shakers is
primarily mud additive with rare to trace
sandstone and siltstone cuttings. WOB
= 14K, GPM = 250, PSI On = 2332,
RPM = 75, TQ On = 23, F/O = 3%,
ECD =11.65 PPG, RT WT = 187K, Total
Bit Hrs 54.56, ADT= 5.14@ 18:00 hrs
21,387.0 21,560.0
3/9/2023
21:00
3/10/2023
00:00
3.00 PROD1, DRILL DDRL P Drill 6-3/4" production hole from 21,560'
to 21,656' MD 7,151’ TVD,
Continue control drilling at reduced ROP
in order to facilitate drop through hard
siderite layer with 100% down.
Material coming across shakers is
primarily mud additive with rare to trace
sandstone and siltstone cuttings. WOB
= 5K, GPM = 260, PSI On = 2481, RPM
= 75, TQ On = 27, F/O = 3%, ECD
=11.70 PPG, RT WT = 187K, Total Bit
Hrs 60.38, ADT= 5.82.
21,560.0 21,656.0
3/10/2023
00:00
3/10/2023
06:00
6.00 PROD1, DRILL DDRL P Drill 6-3/4" production hole from 21,656'
to 21,835' MD 7,155’ TVD,
Continue control drilling at reduced ROP
in order to facilitate drop through hard
siderite layer with 100% down.
Material coming across shakers is
primarily mud additive with rare to trace
sandstone and siltstone cuttings. WOB
= 2K, GPM = 260, PSI On = 2472, RPM
= 90, TQ On = 27, F/O = 4%, ECD
=11.77 PPG, RT WT = 187K, Total Bit
Hrs 65.29, ADT= 4.9 Hrs.
21,656.0 21,835.0
3/10/2023
06:00
3/10/2023
12:00
6.00 PROD1, DRILL DRLG P Drill 6-3/4" production hole from 21,835'
to 22,030' MD 7,158’ TVD,
Continue control drilling at reduced ROP
in order to facilitate drop through hard
siderite layer with 100% down.
Material coming across shakers is
primarily mud additive with rare to trace
sandstone and siltstone cuttings. WOB
=6K, GPM = 250, PSI On = 2365, RPM
= 90, TQ On = 28, F/O = 4%, ECD
=11.80 PPG, RT WT = 187K, Total Bit
Hrs 70.35, ADT= 5.40 Hrs.
21,835.0 22,030.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 83/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/10/2023
12:00
3/10/2023
15:30
3.50 PROD1, DRILL DDRL P Drill 6-3/4" production hole from 22,030'
to 22,130' MD 7,160’ TVD,
Continue control drilling at reduced ROP
in order to facilitate drop through hard
siderite layer with 100% down.
Material coming across shakers is
primarily mud additive with rare to trace
sandstone and siltstone cuttings. WOB
=7K, GPM = 250, PSI On = 2376, RPM
= 90, TQ On = 25, F/O = 4%, ECD
=11.80 PPG, RT WT = 188K, Total Bit
Hrs 73.39, ADT= 2.94 Hrs.
22,030.0 22,130.0
3/10/2023
15:30
3/10/2023
16:00
0.50 PROD1, DRILL SRVY T Obtain final survey prior to trip. 22,130.0 22,130.0
3/10/2023
16:00
3/10/2023
16:45
0.75 PROD1, DRILL CIRC T Circulate, rotate and reciprocate
F/22,125' T/22,035' while preparing for
displacement. RPM = 120, TQ = 27K,
GPM = 250, PSI = 2350.
22,130.0 22,035.0
3/10/2023
16:45
3/11/2023
00:00
7.25 PROD1, DRILL DISP T PJSM. Pump 100 bbls 12.0 ppg Hi-Vis
Spacer, displace well to12.0 ppg brine
while rotating and reciprocating.
F/22,125' T/22,035' MD, 100 = RPM,
25K = TQ, 250 = GPM, 1855 = PSI.
22,035.0 22,125.0
3/11/2023
00:00
3/11/2023
00:30
0.50 PROD1, DRILL DISP T Finish displacing well to12.0 ppg brine
while rotating and reciprocating.
F/22,125' T/22,035' MD, 100 = RPM,
24K = TQ, 250 = GPM, 1840 = PSI.
Total strokes 26,285. 140 bbls inter
phase.
22,125.0 22,035.0
3/11/2023
00:30
3/11/2023
01:00
0.50 PROD1, DRILL CIRC T Take SPR's and B/D top drive. 22,125.0 22,125.0
3/11/2023
01:00
3/11/2023
01:30
0.50 PROD1, DRILL OWFF T OWFF F/30 minutes - static. 22,125.0 22,125.0
3/11/2023
01:30
3/11/2023
02:00
0.50 PROD1, DRILL SMPD T SOOH F/22,125' T/21,795' MD
maintaining MPD pressure 130 psi =
12.2 ECD and 80 psi on slips following
Beyond tripping schedule.
22,125.0 21,795.0
3/11/2023
02:00
3/11/2023
04:45
2.75 PROD1, DRILL DLOG T Perform MADD pass F/21,795'
T/21,685' as per DD at 100 fph. RPM =
40, GPM = 250, PSI = 1845, Flow = 4%,
TQ = 25K, RTW = 185K.
21,795.0 21,685.0
3/11/2023
04:45
3/11/2023
05:30
0.75 PROD1, DRILL SMPD T SOOH F/21,685' T/21,172' MD
maintaining MPD pressure 130 psi =
12.2 ECD and 80 psi on slips following
Beyond tripping schedule.
21,685.0 21,185.0
3/11/2023
05:30
3/11/2023
06:00
0.50 PROD1, DRILL DLOG T Perform MADD pass F/21,185'
T/21,172' as per DD at 100 fph. RPM =
40, GPM = 250, PSI = 1845, Flow = 4%,
TQ = 25K, RTW = 185K.
21,185.0 21,172.0
3/11/2023
06:00
3/11/2023
09:30
3.50 PROD1, DRILL DLOG T Perform MADD pass F/21,172'
T/21,105', F/21,065' T/20,935' as per
DD at 100 fph. RPM = 40, GPM = 250,
PSI = 1845, Flow = 4%, TQ = 25K, RTW
= 182K.
21,172.0 21,065.0
3/11/2023
09:30
3/11/2023
11:00
1.50 PROD1, DRILL SMPD T SOOH F/20,935' T/20,138' MD
maintaining MPD pressure 130 psi =
12.2 ECD and 80 psi on slips following
Beyond tripping schedule.
21,065.0 20,138.0
3/11/2023
11:00
3/11/2023
11:30
0.50 PROD1, DRILL OWFF T OWFF F/30 minutes via 2" bleeder in
cellar - static.
20,138.0 20,138.0
3/11/2023
11:30
3/11/2023
12:00
0.50 PROD1, DRILL MPDA T PJSM. Removing 5-7/8" MPD Bearing. 20,138.0 20,138.0
3/11/2023
12:00
3/11/2023
12:30
0.50 PROD1, DRILL MPDA T Continue removing 5-7/8" MPD Bearing. 20,138.0 20,138.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 84/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/11/2023
12:30
3/11/2023
12:45
0.25 PROD1, DRILL TRIP T POOH F/20,138 T/20,088' and stand
back last stand 5-7/8" DP, Remove 5-
7/8" x 4-1/2" XO.
20,138.0 20,088.0
3/11/2023
12:45
3/11/2023
13:00
0.25 PROD1, DRILL RURD T Change out 5-7/8" elevators to 4-1/2". 20,088.0 20,088.0
3/11/2023
13:00
3/11/2023
18:00
5.00 PROD1, DRILL TRIP T POOH w/4-1/2" DP on elevators
F/20,088' T/15,736' following Beyond
tripping schedule.
20,088.0 15,736.0
3/11/2023
18:00
3/12/2023
00:00
6.00 PROD1, DRILL TRIP T POOH w/4-1/2" DP on elevators
F/15,736' T/5,138' following Beyond
tripping schedule.
15,736.0 5,138.0
3/12/2023
00:00
3/12/2023
02:00
2.00 PROD1, DRILL TRIP T POOH w/4-1/2" DP on elevators
F/5,138' T/1,344' following Beyond
tripping schedule. P/U = 85K, S/O =
80K.
5,138.0 1,344.0
3/12/2023
02:00
3/12/2023
03:00
1.00 PROD1, DRILL OTHR T Daylight Savings Time Change. 1,344.0 1,344.0
3/12/2023
03:00
3/12/2023
03:30
0.50 PROD1, DRILL TRIP T POOH w/4-1/2" DP on elevators
F/1,344' T/212' following Beyond
tripping schedule. P/U = 85K, S/O =
80K.
1,344.0 212.0
3/12/2023
03:30
3/12/2023
04:00
0.50 PROD1, DRILL OWFF T OWFF - static. SIMOPS: PJSM F/ L/D
BHA.
212.0 212.0
3/12/2023
04:00
3/12/2023
06:00
2.00 PROD1, DRILL BHAH T L/D 6-3/4" BHA #7 as per SLB DD
F/212' T/153'. Monitor hole on trip tank.
212.0 153.0
3/12/2023
06:00
3/12/2023
08:30
2.50 PROD1, DRILL BHAH T Continue L/D BHA #7 F/153' T/Surface. 153.0 0.0
3/12/2023
08:30
3/12/2023
09:15
0.75 PROD1, DRILL CLEN T Clean and clear rig floor. L/D BHA
componets out beavers slide. Changed
out elevators to 5".
0.0 0.0
3/12/2023
09:15
3/12/2023
10:00
0.75 PROD1, WHDBOP RURD T P/U 2 jts 5" DP and wear bushing puller.
M/U 4-1/2" and 5-7/8' Dart Valves.
0.0 0.0
3/12/2023
10:00
3/12/2023
12:00
2.00 PROD1, WHDBOP RURD T Drain BOP, RIH and pull wear bushing,
L/D same.
0.0 0.0
3/12/2023
12:00
3/12/2023
13:30
1.50 PROD1, WHDBOP WWWH T P/U 1 stand 5-7/8" DP, XO and wash
tool.
Wash BOP, Riser and wellhead area to
top Annular. Spaced out and function
annular, UPR's and LPR's. L/D wash
tool and rack back stand DP. B/D top
drive.
0.0 0.0
3/12/2023
13:30
3/12/2023
14:30
1.00 PROD1, WHDBOP MPDA T Remove master bushing. C/O air boot
on riser. Fill and check for leaks - ok.
0.0 0.0
3/12/2023
14:30
3/12/2023
15:00
0.50 PROD1, WHDBOP RURD T RIH with 2 stands 5-7/8" DP to hang
below test plug.
0.0 180.0
3/12/2023
15:00
3/12/2023
15:30
0.50 PROD1, WHDBOP RURD T Grease upper and lower IBOP's, C/O
elevators to 5".
180.0 180.0
3/12/2023
15:30
3/12/2023
16:30
1.00 PROD1, WHDBOP RURD T M/U test joint, pup joints and Cameron
test plug. RIH and set test plug.
180.0 225.0
3/12/2023
16:30
3/12/2023
18:00
1.50 PROD1, WHDBOP BOPE T Fill BOP with water, R/U top drive and
test joint. Purge air out of lines. PJSM
for testing BOP. Test gas alarms.
225.0 225.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 85/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/12/2023
18:00
3/13/2023
00:00
6.00 PROD1, WHDBOP BOPE T Perform BOPE Tests W/ 4 1/2" test joint,
Annular 250 psi F/ 5 min, 2,500 psi F/
10 min. Remaining Test 250 F/ 5 min,
4,000 F/ 10 min. Upper 4-1/2" X 7-5/8"
VBRS, Lower 3-1/2" x 6-5/8" VBRS,
CMV #1-2, #4-16 Manual & HCR
Choke/KIll and Kill Valve #3, Upper and
Lower IBOPS, 4-1/2" and 5-7/8" TIW
and Dart Valves, Charted all test. Test
PVT Gain /Loss and Flow out Alarms.
Test LEL and H2S alarms.
AOGCC Brian Bixby waived witness
BOP test on 3-10-2023 @ 15:42 hrs.
BLM Quinn Sawyer waived witness
BOP test on 3-10-2023 @ 16:08 hrs.
225.0 225.0
3/13/2023
00:00
3/13/2023
04:00
4.00 PROD1, WHDBOP BOPE T Perform BOPE Tests W/ 4 1/2" & 5-7/8"
test joints, Annular 250 psi F/ 5 min,
2,500 psi F/ 10 min. Remaining Test 250
F/ 5 min, 4,000 F/ 10 min. Upper 4-1/2"
X 7-5/8" VBRS, Lower 3-1/2" x 6-5/8"
VBRS, CMV #3, Blind Shears, Manual
and electric super choke. Charted all
test. Conducted Koomey drawdown,
Accumulator = 3,050 psi, Manifold =
1,550 psi, Accumulator = 1,625 psi after
all functions on bottles, 11 seconds for
200 psi build with 2 electric pumps. 84
seconds to full system pressure with 2
electric pumps and 6 air pumps. Closing
times: Annular = 22 sec, UPR = 17 sec,
Blind/Shear rams = 17 sec, LPR = 16
sec, Choke HCR = 2 sec, Kill HCR = 2
sec. Nitrogen back up 10 bottle average
= 3,600 psi.
AOGCC Brian Bixby waived witness
BOP test on 3-10-2023 @ 15:42 hrs.
BLM Quinn Sawyer waived witness
BOP test on 3-10-2023 @ 16:08 hrs.
225.0 255.0
3/13/2023
04:00
3/13/2023
06:00
2.00 PROD1, WHDBOP RURD T Pull Cameron test plug, L/D 5-7/8" test
joint, rack back 2 stands 5-7/8" DP in
derrick.
255.0 0.0
3/13/2023
06:00
3/13/2023
07:00
1.00 PROD1, WHDBOP RURD T P/U 2 joints 5" DP, M/U Cameron wear
bushing on running tool and set same.
L/D 5" DP and running tool.
0.0 0.0
3/13/2023
07:00
3/13/2023
08:30
1.50 PROD1, DRILL RURD T C/O elevators to 4-1/2". Clean and
inspect saver sub and pipe handler. P/U
BHA components via beavers slide to
floor.
0.0 0.0
3/13/2023
08:30
3/13/2023
09:30
1.00 PROD1, DRILL WAIT T SLB confirming DigiScope tool checks.
SIMOPS: C/O lower IBOP grease plug,
service ST-120 and C/O dies.
0.0 0.0
3/13/2023
09:30
3/13/2023
10:00
0.50 PROD1, DRILL RURD T Install strip-o-matic over hole and test.
Swapped air hoses.
0.0 0.0
3/13/2023
10:00
3/13/2023
12:00
2.00 PROD1, DRILL BHAH T M/U BHA #8 T/124' as per SLB DD. M/U
remainder of BHA on bottom of single 4-
1/2" DP in mousehole.
0.0 124.0
3/13/2023
12:00
3/13/2023
13:00
1.00 PROD1, DRILL BHAH T PJSM. Load source in ADN. Continue
M/U BHA T/182' from mousehole as per
SLB DD. L/D single 4-12" DP and XO.
124.0 182.0
3/13/2023
13:00
3/13/2023
13:45
0.75 PROD1, DRILL TRIP T RIH with BHA #8 F/182' T/1,500' on 4-
1/2" DP. Monitoring returns on trip tank.
Identified improper make up torques
used.
182.0 1,500.0
3/13/2023
13:45
3/13/2023
14:45
1.00 PROD1, DRILL TRIP T POOH on elevators F/1,500' T/276' on
4-1/2" DP checking connection torques.
Monitoring displacement on trip tank.
1,500.0 276.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 86/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/13/2023
14:45
3/13/2023
16:00
1.25 PROD1, DRILL TRIP T RIH with BHA #8 F/276' T/3,006' on 4-
1/2" DP. Monitoring returns on trip tank.
P/U = 123K, S/O= 121K. Bit at 1,500' at
15:30 hrs.
276.0 3,006.0
3/13/2023
16:00
3/13/2023
16:30
0.50 PROD1, DRILL CIRC T Fill pipe with 40 bbls 12.0 ppg Brine.
Shalow Hole Test SLB tools @ 225
gpm, 1000 psi. Good test.
3,006.0 3,006.0
3/13/2023
16:30
3/13/2023
16:45
0.25 PROD1, DRILL RURD T Remove XO and B/D top drive. 3,006.0 3,006.0
3/13/2023
16:45
3/13/2023
18:00
1.25 PROD1, DRILL TRIP T RIH with BHA #8 F/3,006' T/5,179' on 4-
1/2" DP. Monitoring returns on trip tank.
Filling every 30 stands.
3,006.0 5,179.0
3/13/2023
18:00
3/14/2023
00:00
6.00 PROD1, DRILL TRIP T RIH with BHA #8 F/5,179' T/13,234' on 4
-1/2" DP. Monitoring returns on trip tank.
Filling every 30 stands. Tested SLB
tools at 11,511' w/231 gpm, 1,244 psi,
P/U = 200K, S/O = 100K.
5,179.0 13,234.0
3/14/2023
00:00
3/14/2023
06:15
6.25 PROD1, DRILL TRIP T RIH with BHA #8 F/13,234' T/19,055' on
4-1/2" DP. Monitoring returns on trip
tank. Filling every 10 stands. Lost ablity
to S/O at 19,055'. P/U = 290K, S/O =
100K.
13,234.0 19,055.0
3/14/2023
06:15
3/14/2023
06:30
0.25 PROD1, DRILL TRIP T Attempt to RIH w/4-1/2' DP on elevators
F/19,055'. Lost ablility to S/O without
rotation.
19,055.0 19,055.0
3/14/2023
06:30
3/14/2023
11:00
4.50 PROD1, DRILL REAM T M/U 5-7/8" x 4-1/2" XO to top drive.
Wash and ream F/19,055' T/20,097'. 20
RPM, 84 GPM, 220 PSI, ROT = 180k.
19,055.0 20,097.0
3/14/2023
11:00
3/14/2023
11:30
0.50 PROD1, DRILL REAM T C/O elevators to 5-7/8". Wash and ream
on 5-7/8' DP F/20,097' T/20,192'. 20
RPM, 84 GPM, 220 PSI, ROT = 180K.
20,097.0 20,192.0
3/14/2023
11:30
3/14/2023
12:00
0.50 PROD1, DRILL RURD T B/D top drive. PJSM for slip and cut drlg
line.
20,192.0 20,192.0
3/14/2023
12:00
3/14/2023
15:15
3.25 PROD1, DRILL SLPC T Hang blocks, remove covers F/draworks
and inspect brakes. Slip and cut 75' drlg
line. Install draworks covers and unhang
blocks. Perform empty block
calibrations. Service top drive and
blocks.
20,192.0 20,192.0
3/14/2023
15:15
3/14/2023
15:30
0.25 PROD1, DRILL REAM T Wash and ream F/20,192' T/20,220'. 20
RPM, 84 GPM, 193 PSI, P/U = 280K,
ROT S/O = 150K. Cannot S/O without
rotation.
20,192.0 20,220.0
3/14/2023
15:30
3/14/2023
17:00
1.50 PROD1, DRILL MPDA T B/D top drive. PJSM. Install 5-7/8" RCD
bearing as per Beyond rep.
20,220.0 20,220.0
3/14/2023
17:00
3/14/2023
17:30
0.50 PROD1, DRILL REAM T Wash and ream testing Novos system
F/20,220' T/20,435'. 20 = RPM, 84 =
GPM, 193 PSI, P/U = 280K, ROT S/O =
146K.
20,220.0 20,435.0
3/14/2023
17:30
3/14/2023
21:45
4.25 PROD1, DRILL REAM T Wash and ream F/20,435' T/21,121'. 20
RPM, 85 GPM, 189 PSI, P/U = 289K,
ROT = 184K, ROT S/O = 149K. Cannot
S/O without rotation.
20,435.0 21,121.0
3/14/2023
21:45
3/14/2023
23:30
1.75 PROD1, DRILL REAM T MADD pass F/21,121' T/21,302' (bit
depths) at 100 FPH. 252 GPM, 1819
PSI, Flow Out 4%, RPM 50, TQ 20K,
ECD 12.1 ppg, P/U = 289K, ROT S/O =
179K R/OT = 186K.
21,121.0 21,302.0
3/14/2023
23:30
3/15/2023
00:00
0.50 PROD1, DRILL REAM T Wash and ream F/21,302' T/21,488'. 40
RPM, 22K = TQ, 82 GPM, 183 PSI, P/U
= 292K, ROT = 186K, ROT S/O =
160K. Cannot S/O without rotation.
21,302.0 21,488.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 87/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/15/2023
00:00
3/15/2023
02:45
2.75 PROD1, DRILL REAM T Wash and ream F/21,488' T/22,175' (tag
bottom w/5K- DPM). 40 RPM, TQ =
22K, 82 GPM, 183 PSI, P/U = 300K,
ROT = 194K, ROT S/O = 160K. Cannot
S/O without rotation.
21,488.0 22,175.0
3/15/2023
02:45
3/15/2023
03:15
0.50 PROD1, DRILL CIRC T P/U to 22,140' and rack back stand.
Drop 1.75" OD SS ball to open well
commander.
22,175.0 22,140.0
3/15/2023
03:15
3/15/2023
04:00
0.75 PROD1, DRILL CIRC T Circulate, rotate and reciprocate while
pumping down ball as per SLB DD. 210
GPM, 1,230 PSI, RPM = 50, TQ = 26K.
At 1570 stks (155 bbls) slowed rate to
83 GPM, 195 PSI, RPM = 50, TQ = 26K.
Ball on seat at 1943 stks (191.7 bbls).
Observed well commander shifting open
at 1,438 psi. Prior to opening: 210 GPM
@ 1,250 PSI, After opening: 210 GPM
@ 450 PSI.
22,140.0 22,070.0
3/15/2023
04:00
3/15/2023
09:00
5.00 PROD1, DRILL CIRC T Displaced 12.0 ppg brine with 11.1 ppg
FloPro mud. Pumped 115 bbls (1170
stks) 13.8 ppg spacer followed with 11.1
ppg FloPro mud staging up to 445 GPM,
2,277 PSI, RPM = 60-120, TQ = 23K
while reciprocating string. P/U = 300K,
RS/O = 178K, ROT = 195K. Total
pumped 29,000 stks (2682.3 bbls). 150
bbls interface during displacement. 95%
material over shakers appeared to be
Calcium Carbonate when weighted
spacer at surface. Full returns during
job.
22,070.0 22,140.0
3/15/2023
09:00
3/15/2023
10:30
1.50 PROD1, DRILL CIRC T Drop 1.75" SS OD ball to close well
commander while reciprocating and
rotating string. Pump down at 208 GPM,
764 PSI, 30 RPM, 22K TQ. Slowed rate
to 2 BPM at 1500 stks (148 bbls). Ball
on seat at 2000 stks (197.4 bbls).
Staged up pressure to 3,100 psi to close
well commander. Confirmed SLB tools
working at 230 GPM, 1,750 PSI. Note: 2
total balls in well commander.
22,140.0 22,140.0
3/15/2023
10:30
3/15/2023
11:00
0.50 PROD1, DRILL CIRC T Obtain SPR's.
SPR's at 22,143' MD, 7,200'TVD MW =
11.1 ppg @ 10.35 hrs
#1 MP 20 SPM @ 580 psi, 30 SPM @
803 psi
#2 MP 20 SPM @ 561 psi. 30 SPM @
794 psi.
22,140.0 22,140.0
3/15/2023
11:00
3/15/2023
11:15
0.25 PROD1, DRILL REAM T Wash and ream F/22,132' T/22,178. 260
GPM, 2,200 PSI, RPM = 75, TQ = 20K
22,140.0 22,171.0
3/15/2023
11:15
3/15/2023
12:00
0.75 PROD1, DRILL DDRL P Control drill 6-3/4" production hole
F/22,171' T/22,178'MD, 7,162'TVD.
WOB =15K, GPM = 260, PSI = 2,295,
RPM = 95, TQ = 27K, ECD = 11.82, P/U
= 300K, RS/O = 190K, ROT = 193K.
22,171.0 22,178.0
3/15/2023
12:00
3/15/2023
18:00
6.00 PROD1, DRILL DDRL P Control drill 6-3/4" production hole
F/22,178' T/22,207'MD, 7,162'TVD.
WOB =5-15K, GPM = 250, PSI = 2,181,
RPM = 100, TQ = 27K, ECD = 11.86,
P/U = 300K, RS/O = 190K, ROT =
193K.
22,178.0 22,207.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 88/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/15/2023
18:00
3/16/2023
00:00
6.00 PROD1, DRILL DDRL P Control drill 6-3/4" production hole
F/22,207' T/22,253'MD, 7,164'TVD.
WOB =5-15K, GPM = 250, PSI = 2,181,
RPM = 100, TQ = 28K, ECD = 11.86,
P/U = 300K, RS/O = 190K, ROT =
193K. Closing choke on MPD on
connections - no pressure observed.
22,207.0 22,253.0
3/16/2023
00:00
3/16/2023
12:00
12.00 PROD1, DRILL DDRL P Drill 6 3/4" hole F/22,253' T/22,328'
Closing choke on MPD on connections -
no pressure observed .
250 GPM
2000 PSI
60-140 RPM
28K TQ on 25K off
10-22K WOB
11.69 ECD
P/U = 266K
S/O ROT = 168K
ROT= 192K
230 Units Max Gas
ADT= 10.95
Bit HRS= 21.96
22,253.0 22,328.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 89/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/16/2023
12:00
3/17/2023
00:00
12.00 PROD1, DRILL DDRL P Drill 6 3/4" hole F/22,328' T/22,426'
Closing choke on MPD on connections -
no pressure observed .
220 - 270 GPM
1680 - 2195 PSI
60 - 140 RPM
30K TQ on 28K off
10-25K WOB
11.70 ECD
P/U = 270K
S/O ROT = 172K
ROT= 186K
154 Units Max Gas
ADT= 10.66
Bit HRS = 32.62
At 17:20 HRS F/22,394' T/22,410'
perform Drill off test at the following
parameters at 5 min steps starting at
15K WOB and 220 GPM
60 RPM - 4.92 FPH
80 RPM - 2.88 FPH
100 RPM - 8.88 FPH
120 RPM - 6.84 FPH
140 RPM - 7.32 FPH , keep rotary at
100 RPM and 220 GPM for the following
test with WOB
13K WOB - 1.92 FPH
16K WOB - 13.20 FPH
19K WOB - 13.80 FPH
22K WOB - 10.92 FPH
25K WOB - 14.4 FPH
28K WOB - 9.12 FPH
30K WOB - 12.24 FPH
220 GPM - 6.36 FPH
230 GPM - 5.16 FPH
240 GPM - 4.32 FPH
250 GPM - 6.24 FPH
260 GPM - 6.48 FPH
270 GPM - 9.36 FPH keep rotary at 100
RPM and 25K WOB for GPM test
Decide to drill ahead with 100 RPM, 25K
WOB and 270 GPM
22,328.0 22,426.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 90/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/17/2023
00:00
3/17/2023
12:00
12.00 PROD1, DRILL DDRL P Drill 6 3/4" hole F/22,426' T/22,538'
Closing choke on MPD on connections -
no pressure observed .
280 GPM
2240 PSI
100 - 120 RPM
32K TQ on 29K off
10-27K WOB
11.70 ECD
P/U = 312K
S/O ROT = 160K
ROT= 198K
272 Units Max Gas
ADT= 9.99
Bit HRS = 42.61
At 22,509' backed reamed the stand
twice at full drilling parameters, perform
TQ and drag with no pumps on 312K
UP, S/O while Rot at 30 RPM 160K, Rot
WT 198K , TQ 25K, observed 732 units
gas on bottoms up
22,426.0 22,538.0
3/17/2023
12:00
3/18/2023
00:00
12.00 PROD1, DRILL DDRL P Drill 6 3/4" hole F/22,538' T/22,628'
Closing choke on MPD on connections -
observed 116 PSI on connection at
22,600'.
265 GPM
2170 PSI
100 - 120 RPM
26K TQ on 17K off
10-27K WOB
11.71 ECD
P/U = 312K
S/O ROT = 160K
ROT= 191K
732 Units Max Gas
ADT= 10.14
Bit HRS = 52.75
Start adding lube 776 at 22,530' to get
system up to 1%
Had CD2 pad operator shut in CD2-35
at 20:15 HRS
22,538.0 22,628.0
3/18/2023
00:00
3/18/2023
00:30
0.50 PROD1, DRILL DDRL P Drill 6 3/4" hole F/22,628' T/22,641'
Closing choke on MPD on connections
265 GPM
2170 PSI
100 RPM
26K TQ on 17K off
12-18K WOB
11.71 ECD
P/U = 312K
S/O ROT = 160K
ROT= 191K
138 Units Max Gas
Bit HRS = 52.75
22,628.0 22,641.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 91/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/18/2023
00:30
3/18/2023
01:30
1.00 PROD1, DRILL CIRC P Notice MPD flow out increasing, P/U off
bottom, shut down pumps close MPD
chokes F/5 min observe 250 PSI on
MPD chokes. Bring pumps back on line,
finish circulating connection gas out
from connection at 22,600'.
No gain, no losses in pit volume
Max gas units = 2056
Circulate at 265 GPM 2195 PSI
22,641.0 22,641.0
3/18/2023
01:30
3/18/2023
10:45
9.25 PROD1, DRILL DDRL P Drill 6 3/4" hole F/22,641' T/22,880'
Closing choke on MPD on connections,
obsreved 130 PSI on connection at
22,694', hold 11.7 PPG EMW on
connection
265 GPM
2170 PSI
100-140RPM
15-18K TQ on 12-14K off
5-18K WOB
11.81 ECD
P/U = 255K
S/O = 141K
ROT= 194K
1090 Units Max Gas from connection at
22,694'
ADT = 6.16
Bit HRS = 59.29
At 3:35 AM at 22,694' shut down pumps,
close MPD chokes montior PSI, build to
122 PSI in 10 min
22,641.0 22,880.0
3/18/2023
10:45
3/18/2023
12:15
1.50 PROD1, DRILL CIRC P CBU after drawdown test at @ 265
GPM 2088 PSI, 100 RPM 13-16K TQ
195K Rot WT
11.75 ECD
Max gas = 635 units from draw down
test
22,880.0 22,880.0
3/18/2023
12:15
3/18/2023
13:00
0.75 PROD1, DRILL OWFF P Shut down mud pumps, close MPD
choke, montior PSI for 30 min build to
141 PSI
10 RPM 9-11K TQ
Line up pump #4 for MPD on back side
for connections
22,880.0 22,880.0
3/18/2023
13:00
3/18/2023
13:15
0.25 PROD1, DRILL DDRL P Drill 6 3/4" hole F/22,880' T/22,891'
Closing choke on MPD on connections,
Hold 11.7 PPG EMW on connection
265 GPM
2140 PSI
100 RPM
15-18K TQ on 12-14K off
6-8K WOB
11.72 ECD
P/U = 255K
S/O = 141K
ROT= 194K
1090 Units Max Gas from connection at
22,694'
ADT = .23
Bit HRS = 59.52
22,880.0 22,891.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 92/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/18/2023
13:15
3/18/2023
22:00
8.75 PROD1, DRILL CIRC T CBU at 250 GPM 1998 PSI, 75 RPM 11-
16 TQ, 40 RPM 10-12K TQ
195K ROT WT
11.75 ECD
Max gas = 1260 units
Circulate until gas down to 105 units to
have a clean mud column in the annuals
for draw down test
22,891.0 22,891.0
3/18/2023
22:00
3/18/2023
22:15
0.25 PROD1, DRILL OWFF T Shut down mud pumps, trap 230 PSI
with MPD chokes. Blow down top drive
and screw back in to string. Line up and
get volume marks on trip tank #2 for
draw down test.
MPD PSI bleed down from 235 PSI to
193 PSI in 20 min
22,891.0 22,891.0
3/18/2023
22:15
3/19/2023
00:00
1.75 PROD1, DRILL OWFF T Perform static draw down test, rotate at
10 RPM 9K TQ 194K Rot WT
Start with 193 PSI on MPD. Trip tank
volume = 20.5 BBLS
All step are choke 50% open for 10
seconds and monitor for 5 min
#1 draw down - PSI from 193 to 123 in 5
min = 70 PSI drop, Pit gain 1.7 BBLS,
1.7 BBLS total
#2 draw down - PSI from 123 to 95 in 5
min = 28 PSI drop. Pit gain 1.1 BBLS,
2.8 BBLS total
#3 draw down - PSI from 95 to 87 in 5
min = 8 PSI drop. Pit gain .5 BBLS, 3.3
BBLS total
#4 draw down - PSI from 87 to 80 in 5
min = 7 PSI drop. Pit gain .9 BBLS, 4.2
BBLS total
#5 draw down - PSI from 80 to 74 in 5
min = 6 PSI drop. Pit gain .7 BBLS, 4.9
BBLS total
#6 draw down - PSI from 74 to 70 in 5
min = 4 PSI drop. Pit gain .9 BBLS, 5.8
BBLS total
#7 draw down - PSI from 70 to 65 in 5
min = 5 PSI drop. Pit gain .7 BBLS, 6.5
BBLS total to pits
Calculated volume bled back to pits 3.7
BBLS from step #3 to #7
23:05 HRS leave shut in and monitor
PSI build
Build from 65 PSI T/118 PSI in 30 min,
build to 126 PSI in 45 min
Bump drill pipe floats at 63 PSI on drill
pipe
22,891.0 22,891.0
3/19/2023
00:00
3/19/2023
11:00
11.00 PROD1, DRILL CIRC T CBU after draw down test at 22,891'
265 GPM 2205 PSI
40 RPM 10 - 13K TQ
194K Rot WT
ECD = 11.88
Max gas seen = 2353 Units
Stand one stand back to 22,786' , hold
230 PSI with MPD on connection
Wash DN from 22,695' T/22,891' at 260
GPM 2176 PSI 60 RPM 11K TQ
22,891.0 22,891.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 93/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/19/2023
11:00
3/20/2023
00:00
13.00 PROD1, DRILL DDRL P Drill 6 3/4" hole F/22,891 T/23,691' while
maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2345 PSI
120 RPM
24K TQ on 17K off
14K WOB
12.11 ECD
P/U - 256K
S/O - 150K
ROT- 195K
129 Units Max Gas
AVG = 61.5 FPH W/connections
ADT= 9.57
Bit HRS= 69.09
22,891.0 23,691.0
3/20/2023
00:00
3/20/2023
05:00
5.00 PROD1, DRILL DDRL P Drill 6 3/4" hole F/23,691 T/23,877' while
maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2325 PSI
100-130RPM
18-27K TQ on 15-17K off
3-15K WOB
11.97 ECD
P/U - 266K
S/O - 146K
ROT- 196K
136 Units Max Gas
23,691.0 23,877.0
3/20/2023
05:00
3/20/2023
12:00
7.00 PROD1, EVALWB DDRL P Drill 6 3/4" hole F/23,877 T/24,080' while
maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2325 PSI
100-130RPM
18-27K TQ on 15-17K off
3-15K WOB
11.97 ECD
P/U - 266K
S/O - 146K
ROT- 196K
136 Units Max Gas
23,877.0 24,080.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 94/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/20/2023
12:00
3/21/2023
00:00
12.00 PROD1, EVALWB DDRL P Drill 6 3/4" hole F/24,080' T/24,475'
while maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2315 PSI
120 RPM
20K TQ on 15K off
5-9K WOB
12.08 ECD
P/U - 265K
S/O - 147K
ROT- 206K
133 Units Max Gas
AVG = 33 FPH W/connections
ADT= 9.53
Bit HRS= 87.73
24,080.0 24,475.0
3/21/2023
00:00
3/21/2023
12:00
12.00 PROD1, EVALWB DDRL P Drill 6 3/4" hole F/24,475' T/24,896'
while maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2340 PSI
120 RPM
21K TQ on 18K off
7-10K WOB
12.09 ECD
P/U - 270K
S/O - 147K
ROT- 206K
133 Units Max Gas
AVG = 35 FPH W/connections
ADT= 10.91
Bit HRS= 98.64
24,475.0 24,896.0
3/21/2023
12:00
3/22/2023
00:00
12.00 PROD1, EVALWB DDRL P Drill 6 3/4" hole F/24,896' T/25,478'
while maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2340 PSI
120 RPM
23K TQ on 17K off
17-22K WOB
12.14 ECD
P/U - 272K
S/O - 148K @ 24,922'
ROT- 198K
177 Units Max Gas
AVG = 48.5 FPH W/connections
ADT= 9.84
Bit HRS= 108.48
Lost slack off WT after 24,922' - TQ and
drag at 25,385' slack off lost
24,896.0 25,478.0
3/22/2023
00:00
3/22/2023
01:00
1.00 PROD1, EVALWB CIRC P At 25,476' gamma climb to 130 API
Circ at 265 GPM 2350 PSI 110 RPM
17K TQ
While discussing with town on direction
to drill
25,478.0 25,478.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 95/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/22/2023
01:00
3/22/2023
16:45
15.75 PROD1, EVALWB DDRL P Drill 6 3/4" hole F/25,478' T/25,966'
while maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2300 PSI
75-150 RPM
25K TQ on 17K off
5-20K WOB
12.14 ECD
P/U - 278K
S/O - N/A
ROT- 198K
177 Units Max Gas
AVG = 31 FPH W/connections
ADT= 13.42
Bit HRS= 121.90
25,478.0 25,966.0
3/22/2023
16:45
3/22/2023
18:00
1.25 PROD1, EVALWB CIRC T Circ at 250 GPM 2140 PSI , 100 RPM
17-22K TQ
11.93 ECD
198K Rot WT
25,966.0 25,853.0
3/22/2023
18:00
3/23/2023
00:00
6.00 PROD1, EVALWB BKRM T BROOH F/25,851' T/25,387'
265 GPM 2300 PSI
100 RPM 17-20K TQ
ECD = 11.98
198K ROT WT
Hold 11.7 EMW at the 7 5/8" shoe with
MPD on connections
Log lower Kalubik shale at 60 RPM 265
GPM 120 FPH, F/25,728' T/25,469'
25,853.0 25,387.0
3/23/2023
00:00
3/23/2023
02:30
2.50 PROD1, EVALWB BKRM T BROOH F/25,387' T/24,639'
205 GPM 1820 PSI
80 RPM 20K TQ
ECD = 11.81
203K ROT WT
Hold 11.7 EMW at the 7 5/8" shoe with
MPD on connections
25,387.0 24,639.0
3/23/2023
02:30
3/23/2023
04:00
1.50 PROD1, EVALWB SMPD T Pump out of hole at 1 BPM F/24,639'
T/24,172'
1 BPM 555 PSI
270 K UP
Holding 190 PSI with MPD dynamic and
230 PSI in slips maintaining 11.7 PPG
EMW at 7 5/8" shoe
Notice pump PSI start to climb 20 - 40
PSI at 24,181'
24,639.0 24,172.0
3/23/2023
04:00
3/23/2023
05:15
1.25 PROD1, EVALWB BKRM T BROOH F/24,172' T/24,080'
220 GPM 1770 PSI
80 RPM 15K TQ
ECD = 11.79
203K ROT WT
Hold 11.7 EMW at the 7 5/8" shoe with
MPD on connections
Observe pump PSI climb to 2650 PSI
with full returns, no losses. PSI slowly
drop back down to 1770 PSI, seemed
the PSI came from inside the drill string
24,172.0 24,080.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 96/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/23/2023
05:15
3/23/2023
07:00
1.75 PROD1, EVALWB CIRC T Circulate at 265 GPM 2240 PSI, 80
RPM 16K TQ
11.79 ECD
204K Rot WT
24,080.0 24,080.0
3/23/2023
07:00
3/23/2023
09:00
2.00 PROD1, EVALWB BKRM T BROOH F/24,080' T/23,840'
260 GPM 2250 PSI
80 RPM 15K TQ
ECD = 11.83
204K ROT WT
Hold 11.7 EMW at the 7 5/8" shoe with
MPD on connections
Confirm inclination for possible side
track points F/23,900' T/23,850'
24,080.0 23,840.0
3/23/2023
09:00
3/23/2023
09:30
0.50 PROD1, EVALWB CIRC T Circ at 265 GPM 2185 PSI, 80 RPM
15K TQ
202K Rot WT
23,840.0 23,840.0
3/23/2023
09:30
3/23/2023
15:00
5.50 PROD1, EVALWB REAM T Wash and ream F/23,840' T/25,385'
265 GPM 2250 PSI
50 RPM 13-16K TQ
11.86 ECD
23,840.0 25,385.0
3/23/2023
15:00
3/23/2023
15:30
0.50 PROD1, EVALWB CIRC T Circ at 265 GPM 2270 PSI, 50 RPM
15K TQ
207K Rot WT
25,385.0 25,385.0
3/23/2023
15:30
3/23/2023
22:30
7.00 PROD1, EVALWB BKRM T BROOH F/25,385' T/23,837'
240 GPM 1940 PSI
60 RPM 15K TQ
ECD = 11.83
204K ROT WT
Hold 11.7 EMW at the 7 5/8" shoe with
MPD on connections
Pump 40 BBL anti jamming pill at
24,900'
25,385.0 23,837.0
3/23/2023
22:30
3/24/2023
00:00
1.50 PROD1, EVALWB KOST T Space out for troughing, send down link
to BHA for tool face for side track.
Observe max out values from power
drive and inconstancy in readings from
power drive.
23,837.0 23,837.0
3/24/2023
00:00
3/24/2023
08:00
8.00 PROD1, EVALWB CIRC T Trouble shoot jammed power drive
Pump anti jamming sweeps x4 for lower
torquer arms and a high possum
number for demand on upper torquer
arms
Circ at 225-285 GPM 2450 PSI, 40-140
RPM 17K TQ
23,837.0 23,837.0
3/24/2023
08:00
3/24/2023
12:00
4.00 PROD1, EVALWB BKRM T BROOH F/23,837' T/22,790'
265 GPM 2030 PSI
60 RPM 15K TQ
ECD = 11.78
201K ROT WT
Hold 11.7 EMW at the 7 5/8" shoe with
MPD on connections
Pump 80 BBL anti jamming sweep
23,837.0 22,790.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 97/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/24/2023
12:00
3/24/2023
15:15
3.25 PROD1, EVALWB REAM T Wash and ream F/22,790' T/23,821'
225 GPM 1700 PSI
60 RPM 13K TQ
11.72 ECD
Max gas = 98 units
Pump 20 BBLS low vis 20 BBL Hivis anti
jamming sweep @ 23,137'
Hold 11.7 EMW at the 7 5/8" shoe with
MPD on connections
22,790.0 23,821.0
3/24/2023
15:15
3/24/2023
19:45
4.50 PROD1, STK KOST X Troughing as per SLBG schedule
F/23,821' T/23,855'
225 GPM 1670 PSI
60 RPM 13K TQ
208K Rot WT
Max Gas = 275 units
Trough F/23,820' T/23,855' x3,
F/23,830' T/23,855' x3, F/23,840'
T/23,855' x5
23,821.0 23,855.0
3/24/2023
19:45
3/24/2023
20:45
1.00 PROD1, STK KOST X Circ and rotate as per kick off schedule
for 1 HR
225 GPM 1675 PSI
60 RPM 13K TQ
205K Rot WT
Max gas = 342 units
Pump 40 BBL anti jamming sweep
23,855.0 23,855.0
3/24/2023
20:45
3/24/2023
21:00
0.25 PROD1, STK KOST X Cont troughing as per schedule
F/23,840' T/23,855'
225 GPM 1672 PSI
60 RPM 13K TQ
Max Gas = 341 units
Pick up one foot T/23,854' for time
drilling
23,840.0 23,854.0
3/24/2023
21:00
3/25/2023
00:00
3.00 PROD1, STK KOST X Time drill as per SLB schedule F/23,854'
T/23,856'
265 GPM 2030 PSI
60 RPM 14K TQ
11.73 ECD
Max gas = 365 units
23,854.0 23,856.0
3/25/2023
00:00
3/25/2023
10:15
10.25 PROD1, STK KOST X Time drill as per SLB schedule F/23,856'
T/23,863'
225 GPM 1700 PSI
60 RPM 14K TQ
11.73 ECD
Max gas = 95 units
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
23,856.0 23,863.0
3/25/2023
10:15
3/25/2023
13:15
3.00 PROD1, STK KOST X While increasing ROP to 2' per hour,
notice sudden loss of WOB and
increase in inclination.
Pick up to trough F/23,847' T/23,862',
trough as per SLB DD at 1 FPH while
slacking off
245 GPM 1950 PSI
60 RPM 14K TQ
ECD = 11.80
208K Rot WT
23,863.0 23,862.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 98/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/25/2023
13:15
3/26/2023
00:00
10.75 PROD1, STK KOST X Time drill as per SLB schedule F/23,862'
T/23,869', as per SLB start seeing WOB
at 23,864'
245 GPM 1945 PSI
60 RPM 14K TQ
11.82 ECD
Max gas = 46 units
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
23,862.0 23,869.0
3/26/2023
00:00
3/26/2023
04:00
4.00 PROD1, STK KOST X Time drill as per SLB schedule F/23,869'
T/23,877'
265 GPM 2290 PSI
60 RPM 15K TQ
11.82 ECD
Max gas = 64 units
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
23,869.0 23,877.0
3/26/2023
04:00
3/26/2023
14:15
10.25 PROD1, STK DDRL X Drill 6 3/4" hole F/23,877' T/24,135'
while maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2390 PSI
100 RPM
26K TQ on 13K off
12-14K WOB
11.99 ECD
P/U - 271K
S/O - 146K
ROT- 201K
42 Units Max Gas
ADT= 7.24
Bit HRS= 131.64
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
23,877.0 24,273.0
3/26/2023
14:15
3/26/2023
16:00
1.75 PROD1, STK MPDA X PJSM for change out MPD bearing
under PSI
Close bag apply 230 PSI under for 11.7
PPG EMW at 7 5/8" casing shoe,
adjusting as needed for removing and
installing bearings
Equalize pressure between bearing and
bag before opening
24,273.0 24,273.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 99/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/26/2023
16:00
3/27/2023
00:00
8.00 PROD1, STK DDRL X Drill 6 3/4" hole F/24,273' T/24,515'
while maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2415 PSI
100 RPM
22K TQ on 19K off
7-14K WOB
12.02 ECD
P/U - 276K
S/O - 146K
ROT- 201K
466 Units Max Gas on bottoms up from
changing out bearing
AVG = 30 FPH W/connections
ADT= 6.32
Bit HRS= 137.96
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
24,273.0 24,515.0
3/27/2023
00:00
3/27/2023
06:00
6.00 PROD1, STK DDRL X Drill 6 3/4" hole F/24,515' T/24,735'
while maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2415 PSI
100 RPM
23K TQ on 20K off
13K WOB
12.08 ECD
P/U - 276K
S/O - 141K
ROT- 200K
66 Units Max Gas
AVG = 37 FPH W/connections
ADT= 5.46
Bit HRS= 143.42
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
24,515.0 24,735.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 100/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/27/2023
06:00
3/27/2023
06:30
0.50 PROD1, STK DDRL X Drill 6 3/4" hole F/24,735' T/24,742'
while maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2491 PSI
100 RPM
23K TQ on 19K off
13K WOB
12.15 ECD
P/U - 279K
S/O - 138K
ROT- 205K
25 Units Max Gas
AVG = 14 FPH W/connections
ADT= .18
Bit HRS= 143.6
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
24,735.0 24,742.0
3/27/2023
06:30
3/27/2023
07:45
1.25 PROD1, STK DDRL XT Troubleshoot power drive as per SLB
DD. Rack back stand #262, circ, recip f/
24,731' t/ 24,646', 60 RPM, 18K TQ,
265 GPM, 2452 PSI, 12.08 ECD, Pump
60 bbl low vis and 60 bbl high vis anti
jamming sweeps, wash back to bottom
24,742.0 24,742.0
3/27/2023
07:45
3/27/2023
12:00
4.25 PROD1, STK DDRL X Drill 6 3/4" hole F/24,742' T/25,014'
while maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2521 PSI
120 RPM
28K TQ on 18K off
15K WOB
12.19 ECD
P/U - 281K
S/O - 139K
ROT- 206K
40 Units Max Gas
AVG = 64 FPH W/connections
ADT= 3.61
Bit HRS= 147.21
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
24,742.0 25,014.0
3/27/2023
12:00
3/27/2023
12:30
0.50 PROD1, STK SVRG X Service rig - Tighten bolts and replace
tie wire on top drive shot pin assembly
25,014.0 25,014.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 101/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/27/2023
12:30
3/27/2023
18:00
5.50 PROD1, STK DDRL X Drill 6 3/4" hole F/25,014' T/25,360'
while maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2502 PSI
120 RPM
27K TQ on 19K off
14K WOB
12.26 ECD
P/U - 282K
S/O - 138K
ROT- 207K
67 Units Max Gas
AVG = 63 FPH W/connections
ADT= 4.66
Bit HRS= 151.87
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
25,014.0 25,360.0
3/27/2023
18:00
3/28/2023
00:00
6.00 PROD1, STK DDRL X Drill 6 3/4" hole F/25,360' T/25,665'
while maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2390 PSI
110 RPM
27K TQ on 20K off
12K WOB
12.12 ECD
P/U - 287K
S/O - 136K
ROT- 205K
124 Units Max Gas
AVG = 51 FPH W/connections
ADT= 4.73
Bit HRS= 156.6
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
25,360.0 25,665.0
3/28/2023
00:00
3/28/2023
06:00
6.00 PROD1, STK DDRL X Drill 6 3/4" hole F/25,665' T/26,027'
while maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2390 PSI
110 RPM
27K TQ on 20K off
12K WOB
12.15 ECD
P/U - 294K
S/O - 124K
ROT- 203K
146 Units Max Gas
AVG = 60 FPH W/connections
ADT= 4.95
Bit HRS= 161.55
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
25,665.0 26,027.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 102/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/28/2023
06:00
3/28/2023
12:00
6.00 PROD1, STK DDRL X Drill 6 3/4" hole F/26,027' T/26,406'
while maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2395 PSI
120 RPM
30K TQ on 18K off
14K WOB
12.19 ECD
P/U - 302K
S/O - 119K
ROT- 209K
146 Units Max Gas
AVG = 63 FPH W/connections
ADT= 4.96
Bit HRS= 166.5
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
26,027.0 26,406.0
3/28/2023
12:00
3/28/2023
18:00
6.00 PROD1, STK DDRL X Drill 6 3/4" hole F/26,406' T/26,778'
while maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2353 PSI
120 RPM
28K TQ on 18K off
6K WOB
12.17 ECD
P/U - 303K
S/O - 118K
ROT- 206K
137 Units Max Gas
AVG = 62 FPH W/connections
ADT= 4.89
Bit HRS= 171.39
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
26,406.0 26,778.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 103/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/28/2023
18:00
3/29/2023
00:00
6.00 PROD1, STK DDRL X Drill 6 3/4" hole F/26,778' T/27,111' while
maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2285 PSI
120 RPM
25K TQ on 20K off
2K WOB
12.02 ECD
P/U - 312K
S/O - N/A
ROT- 205K
1405 Units Max Gas, gas from cutting
Kup C sand
AVG = 55.5 FPH W/connections
ADT= 4.54
Bit HRS= 175.93
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
26,778.0 27,111.0
3/29/2023
00:00
3/29/2023
01:00
1.00 PROD1, STK DDRL X Drill 6 3/4" hole F/27,111' T/27,146' while
maintaining 11.7 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2310 PSI
120 RPM
25K TQ on 20K off
12K WOB
12.02 ECD
P/U - 312K
S/O - N/A
ROT- 205K
2344 Units Max Gas, gas from TQ/drag
at 26,865'
ADT= .97
Bit HRS= 176.90
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
27,111.0 27,146.0
3/29/2023
01:00
3/29/2023
03:45
2.75 PROD1, STK CIRC X Circulate thru gas buster while
monitoring gas units and cuttings at
shakers
265 GPM 2310 PSI
60 RPM 20K TQ
Max units 834 units
12.13 - 12.03 ECD
27,146.0 27,146.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 104/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/29/2023
03:45
3/29/2023
05:15
1.50 PROD1, STK DDRL X Drill 6 3/4" hole F/27,146' T/27,240'
while maintaining 12.1 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM
2310 PSI
120 RPM
25K TQ on 20K off
5K WOB
12.12 ECD
P/U - 312K
S/O - N/A
ROT- 205K
2344 Units Max Gas, gas from TQ/drag
at 26,865'
ADT= 1.26
Bit HRS= 178.16
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
27,146.0 27,240.0
3/29/2023
05:15
3/29/2023
12:30
7.25 PROD1, STK CIRC XT Circulate thru gas buster at 265 GPM
2375 PS, 60 RPM 20K TQ, 205K ROT,
12.13 ECD, 1150 units max gas. 11.1
MW
27,240.0 27,240.0
3/29/2023
12:30
3/29/2023
14:30
2.00 PROD1, STK OWFF XT Perform drawdown via MPD choke.
Shut down pump, trap 12.2 ppg EMW,
perform 10ea ~40 psi step down bleed
offs, monitor psi for 5 min after each
cycle, monitor final shut 25 min. Final
pressue= 372 psi RCD, 327 psi DP. 14
bbls total pit gain
27,240.0 27,240.0
3/29/2023
14:30
3/29/2023
22:00
7.50 PROD1, STK CIRC XT CBU through gas buster after draw
down test at 27,240'
265 GPM 2205 PSI
60 RPM 18K TQ
206K Rot WT
ECD = 12.25
Max gas seen = 1180 Units
27,240.0 27,240.0
3/29/2023
22:00
3/30/2023
00:00
2.00 PROD1, STK CIRC XT Circulate thru MGS while build 12.6
sodium bromide vis brine
265 GPM 2205 PSI
60 RPM 18K TQ
206K Rot WT
ECD = 12.25
Max gas seen = 586 Units
27,240.0 27,240.0
3/30/2023
00:00
3/30/2023
02:45
2.75 PROD1, STK CIRC XT Circulate while building 12.6 PPG
sodium bromide vis brine
265 GPM 2075 PSI
60 RPM 18K TQ
203K Rot WT
ECD = 12.34
Max gas seen = 281 Units
Off MGS at 0240 Hrs
27,240.0 27,240.0
3/30/2023
02:45
3/30/2023
12:00
9.25 PROD1, STK CIRC XT Circulate while building 12.6 PPG
sodium bromide vis brine
265 GPM 2060 PSI
60 RPM 18K TQ
203K Rot WT
ECD = 12.32
Max gas seen = 125 Units
27,240.0 27,240.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 105/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
3/30/2023
12:00
3/30/2023
14:30
2.50 PROD1, STK CIRC XT Circulate while building 12.6 PPG
sodium bromide vis brine
265 GPM 2009 PSI
60 RPM 18K TQ
203K Rot WT
ECD = 12.31
Max gas seen = 131 Units
27,240.0 27,240.0
3/30/2023
14:30
3/30/2023
18:00
3.50 PROD1, STK BKRM XT BROOH F27,235 T/26,150'
265 GPM 1993 PSI
60 RPM 15K TQ
ECD = 12.36
203K ROT WT
Hold 12.3 EMW with MPD on
connections
27,240.0 26,150.0
3/30/2023
18:00
3/31/2023
00:00
6.00 PROD1, STK BKRM XT BROOH F/26,150' T/24,924' - Hold 12.3
EMW with MPD on connections
265 GPM 2050 PSI
60 RPM 15K TQ
ECD = 12.46
206K ROT WT
Max gas = 329 units
26,150.0 24,924.0
3/31/2023
00:00
3/31/2023
06:45
6.75 PROD1, STK BKRM XT BROOH F/24,924' T/23,250' - Hold 12.3
EMW with MPD on connections
265 GPM 2000 PSI
60 RPM 17K TQ
ECD = 12.51
201K ROT WT
Max gas = 1011 units
24,924.0 23,250.0
3/31/2023
06:45
3/31/2023
12:00
5.25 PROD1, STK CIRC XT Circulate while weighing up in .3 PPG
increments from 11.1 PPG T/11.4 PPG
with micro bar
265 GPM 1900 PSI
60 RPM 14K TQ
12.50 ECD
197K Rot WT
Max gas = 108 units
23,250.0 23,250.0
3/31/2023
12:00
3/31/2023
18:00
6.00 PROD1, STK CIRC XT Circulate while weighing up in .3 PPG
increments from 11.4 PPG T/11.7 PPG
with micro bar
265 GPM 1900 PSI
60 RPM 14K TQ
12.60 ECD
197K Rot WT
Max gas = 53 units
23,250.0 23,250.0
3/31/2023
18:00
4/1/2023
00:00
6.00 PROD1, STK CIRC XT Circulate while weighing up in .3 PPG
increments from 11.7 PPG T/12.0 PPG
with micro bar
265 GPM 1893 PSI
60 RPM 14K TQ
12.60 ECD
197K Rot WT
Max gas = 149 units
23,250.0 23,250.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 106/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/1/2023
00:00
4/1/2023
06:00
6.00 PROD1, STK CIRC XT Circulate while weighing up F/12.0 PPG
T/12.6 PPG with 15.0 ppg spike fluid
265 GPM 1908 PSI
60 RPM 14K TQ
12.98 ECD
200K Rot WT
Max gas = 45 units
23,250.0 23,250.0
4/1/2023
06:00
4/1/2023
12:00
6.00 PROD1, STK CIRC XT Circulate while weighing up F/12.0 PPG
T/12.6 PPG with 15.0 ppg spike fluid
110 GPM 760 PSI
60 RPM 15K TQ
13.2 ECD modeled
199K Rot WT
Max gas = 41 units
Slow pump rate down as needed to
keep ECD under 13.2 PPG - then follow
beyond pump schedule
23,250.0 23,250.0
4/1/2023
12:00
4/1/2023
13:30
1.50 PROD1, STK CIRC XT Circulate while weighing up F/12.0 PPG
T/12.6 PPG with 15.0 ppg spike fluid
110 GPM 760 PSI
60 RPM 15K TQ
13.2 ECD modeled
199K Rot WT
Max gas = 41 units
12.6 ppg in and out
Slow pump rate down as needed to
keep ECD under 13.2 PPG
23,250.0 23,250.0
4/1/2023
13:30
4/1/2023
14:15
0.75 PROD1, STK OWFF XT Blow down TD, flow check w/rot 20 rpm 23,250.0 23,250.0
4/1/2023
14:15
4/1/2023
19:30
5.25 PROD1, STK SMPD X SOOH F/23,250' T/20,187' w/MPD per
schedule to offset swab to last std 5-7/8"
DP.
23,250.0 20,187.0
4/1/2023
19:30
4/1/2023
21:00
1.50 PROD1, STK OWFF X Flow check. 1 hr to go static. OWFF 30
min static
20,187.0 20,187.0
4/1/2023
21:00
4/1/2023
22:30
1.50 PROD1, STK MPDA X Swap MPD bearing/element F/ 5-7/8" T/
4-1/2"
20,187.0 20,187.0
4/1/2023
22:30
4/2/2023
00:00
1.50 PROD1, STK SMPD X SOOH F/20,187' T/20,19,057' w/MPD
per schedule to offset swab
20,187.0 19,057.0
4/2/2023
00:00
4/2/2023
01:30
1.50 PROD1, STK SMPD X SOOH F/19,057' T/17,918' w/MPD
holding 12.6 PPG EMW per schedule to
offset swab
218K UP
19,057.0 17,918.0
4/2/2023
01:30
4/2/2023
07:30
6.00 PROD1, STK CIRC X CBU to make sure mud correct mud
weight, stage pumps up to 265 GPM
1800 PSI, 60 RPM 12K TQ
168K Rot WT
17,918.0 17,918.0
4/2/2023
07:30
4/2/2023
10:30
3.00 PROD1, STK OWFF X Blow down top drive, flow check until
static
17,918.0 17,918.0
4/2/2023
10:30
4/2/2023
15:30
5.00 PROD1, STK SMPD X SOOH F/17,918' T/10,472' w/MPD
holding 12.6 PPG EMW per schedule to
offset swab
168K UP
17,918.0 10,472.0
4/2/2023
15:30
4/2/2023
16:00
0.50 PROD1, STK SVRG X Service top drive and blocks 10,472.0 10,472.0
4/2/2023
16:00
4/2/2023
16:45
0.75 PROD1, STK RGRP XT Replace spinner hose on ST120 10,472.0 10,472.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 107/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/2/2023
16:45
4/2/2023
20:00
3.25 PROD1, STK SMPD X SOOH F/10,472' T/5,938' w/MPD
holding 12.6 PPG EMW per schedule to
offset swab
161K UP
10,472.0 5,938.0
4/2/2023
20:00
4/2/2023
23:00
3.00 PROD1, STK OWFF X Flow check - Static in 2 1/2 HRS -
monitor 30 min after static
SimOps - PJSM for blowing down MPD
lines and pulling 4 1/2" RCD
5,938.0 5,938.0
4/2/2023
23:00
4/3/2023
00:00
1.00 PROD1, STK MPDA X Pull 4 1/2" RCD as per MPD advisor 5,938.0 5,938.0
4/3/2023
00:00
4/3/2023
00:45
0.75 PROD1, STK CIRC X Pump dry job, blow down top drive 5,938.0 5,938.0
4/3/2023
00:45
4/3/2023
03:00
2.25 PROD1, STK TRIP X POOH F/5,938' T/1,711' 5,938.0 1,711.0
4/3/2023
03:00
4/3/2023
03:30
0.50 PROD1, STK OWFF X Observed inproper hole fill last 10
stands
Shut down, flow check, slight drop in
fluid
1,711.0 1,711.0
4/3/2023
03:30
4/3/2023
04:15
0.75 PROD1, STK TRIP X POOH F/1,711' T/653' 1,711.0 653.0
4/3/2023
04:15
4/3/2023
04:45
0.50 PROD1, STK OWFF X Flow check - slight drop
PJSM L/D BHA #8
653.0 653.0
4/3/2023
04:45
4/3/2023
05:00
0.25 PROD1, STK TRIP X POOH F/653' T/182' 653.0 182.0
4/3/2023
05:00
4/3/2023
08:00
3.00 PROD1, STK BHAH X L/D BHA # 8 as per SLB DD
Stabilzer's on the NM stab, ADN and the
microscope were worn off
Periscope reciever window was loose
Power drive all pads were there but
worn down, control stab was worn off
182.0 0.0
4/3/2023
08:00
4/3/2023
10:15
2.25 PROD1, STK BHAH X Shut blind rams, Clean and clear floor,
LD BHA #8, PU BHA #9
SIMOPS: C/O KR valve, Replace upper
air boot on BOP riser, prep for BOP test
0.0 0.0
4/3/2023
10:15
4/3/2023
11:00
0.75 PROD1, WHDBOP WWWH X Function preventers, MU stack wash
tool to 1 std 5-7/8" DP, wash stack at
max pump rate until shakers clean
0.0 0.0
4/3/2023
11:00
4/3/2023
12:00
1.00 PROD1, WHDBOP RURD X Drain stack, blow down choke, kill, mud
line and TD. MU WR running tool w/ 2
Jts 5" DP and pull wear ring.
0.0 0.0
4/3/2023
12:00
4/3/2023
12:45
0.75 PROD1, WHDBOP RURD X Set test plug per SOP w/ 4-1/2" test
joint, hang stand of 5-7/8" DP below test
plug
0.0 0.0
4/3/2023
12:45
4/3/2023
13:30
0.75 PROD1, WHDBOP RURD X Flood BOP, kill line choke line and
choke manifold with water, conduct shell
test ok
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 108/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/3/2023
13:30
4/3/2023
18:00
4.50 PROD1, WHDBOP BOPE X Perform BOPE Tests W/ 4 1/2" test joint,
Annular 250 psi F/ 5 min, 2,500 psi F/
10 min. Remaining Test 250 F/ 5 min,
4,000 F/ 10 min. Upper 4-1/2" X 7-5/8"
VBRS, Lower 3-1/2" x 6-5/8" VBRS,
CMV #1-#16 Manual & HCR Choke/KIll
and Kill Valve #3, Upper and Lower
IBOPS, 4-1/2" and 5-7/8" TIW and Dart
Valves, Charted all tests. Test PVT
Gain /Loss and Flow out Alarms. Test
LEL and H2S alarms. AOGCC Kam
StJohn waived witness BOP test on 3-
31-2023 @ 06:28 hrs. BLM Quinn
Sawyer waived witness BOP test on 3-
30-2023 @ 13:05 hrs.
0.0 0.0
4/3/2023
18:00
4/3/2023
21:30
3.50 PROD1, WHDBOP BOPE X Perform BOPE Tests W/ 4 1/2" & 5-7/8"
test joints, Test T/ 250 F/ 5 min, 4,000 F/
10 min. Upper 4-1/2" X 7-5/8" VBRS,
Lower 3-1/2" x 6-5/8" VBRS, CMV #3,
Blind Shears, Manual choke B and
electric super choke A. Charted all test.
Conducted Koomey drawdown,
Accumulator = 2,900 psi, Manifold =
1,480 psi, Accumulator = 1,650 psi after
all functions on bottles, 17 seconds for
200 psi build with 2 electric pumps. 93
seconds to full system pressure with 2
electric pumps and 6 air pumps. Closing
times: Annular = 24 sec, UPR = 15 sec,
Blind/Shear rams = 16 sec, LPR = 15
sec, Choke HCR = 2 sec, Kill HCR = 2
sec. Nitrogen back up 10 bottle average
= 3,950 psi. Test PVT gain/loss & flow
out alarms. AOGCC Kam StJohn waived
witness BOP test on 3-31-2023 @ 06:28
hrs. BLM Quinn Sawyer waived witness
BOP test on 3-30-2023 @ 13:05 hrs.
0.0 0.0
4/3/2023
21:30
4/3/2023
23:00
1.50 PROD1, WHDBOP RURD X Pull test plug as per SOP w/ 5-7/8" test
Jt, rack back std 5-7/8" DP in derrick
0.0 0.0
4/3/2023
23:00
4/4/2023
00:00
1.00 PROD1, WHDBOP RURD X Blow down all surface lines, RD testing
equipment, clean clear floor
0.0 0.0
4/4/2023
00:00
4/4/2023
00:30
0.50 PROD1, WHDBOP RURD X Clean and clear rig floor, P/U 2 JTS 5"
DP and wear ring setting tool
SimOps - work on ST120
0.0 0.0
4/4/2023
00:30
4/4/2023
01:00
0.50 PROD1, WHDBOP SVRG X Clean and service pipe stripper 0.0 0.0
4/4/2023
01:00
4/4/2023
02:00
1.00 PROD1, WHDBOP RGRP XT Repair ST-120 Iron roughneck 0.0 0.0
4/4/2023
02:00
4/4/2023
03:00
1.00 PROD1, WHDBOP RURD X Set W/R, check lockdown
measurements, L/D setting tool and 2
JTS 5" DP, fill stack 22 bbls
0.0 0.0
4/4/2023
03:00
4/4/2023
07:00
4.00 PROD1, STK BHAH X PJSM, M/U BHA #9 as per SLB DD
T/181'
0.0 181.0
4/4/2023
07:00
4/4/2023
08:45
1.75 PROD1, STK TRIP X RIH F/182' T/3,006'
104K DN
Single in the first 8 STDS of 4 1/2" DP
181.0 3,006.0
4/4/2023
08:45
4/4/2023
09:45
1.00 PROD1, STK CIRC X Shallow test MWD tools
260 GPM 1556 PSI
3,006.0 3,006.0
4/4/2023
09:45
4/4/2023
18:30
8.75 PROD1, STK TRIP X RIH F/3,006' T/17,955'
118K DN
Filling pipe every 30 STDS
3,006.0 17,955.0
4/4/2023
18:30
4/4/2023
19:30
1.00 PROD1, STK MPDA X PJSM, install 4-1/2" RCD
bearing/element per MPD advisor/SOP
17,955.0 17,955.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 109/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/4/2023
19:30
4/4/2023
21:30
2.00 PROD1, STK RURD X C/O TD saver sub, inspect grabber dies.
SIMOPS: Prep for slip and cut
17,955.0 17,955.0
4/4/2023
21:30
4/4/2023
22:30
1.00 PROD1, STK SLPC X MU 10', 5-7/8" pup, hang blocks,
remove drawworks covers
17,955.0 17,955.0
4/4/2023
22:30
4/5/2023
00:00
1.50 PROD1, STK SLPC X Slip and cut 85' of drill line.
SIMOPS: Begin circ/ reduce MW to 12.3
ppg mud. 120 gpm, 820 psi
17,955.0 17,955.0
4/5/2023
00:00
4/5/2023
00:30
0.50 PROD1, STK SLPC X Install drawworks covers, unhang blocks 17,955.0 17,955.0
4/5/2023
00:30
4/5/2023
05:00
4.50 PROD1, STK DISP X Circ 12.3 PPG mud in and out @ 250
GPM 2150 PSI
17,955.0 17,955.0
4/5/2023
05:00
4/5/2023
05:30
0.50 PROD1, STK OTHR X Blow down top drive, get empty block
calibration for TQ/Drag
17,955.0 17,955.0
4/5/2023
05:30
4/5/2023
07:15
1.75 PROD1, STK SMPD X Strip in the hole with 4 1/2" DP F/17,955'
T/20,097'
As per Beyond schedule, holding 12.5
PPG EMW at toe
120K DN
17,955.0 20,097.0
4/5/2023
07:15
4/5/2023
07:45
0.50 PROD1, STK OWFF X Obtain rotating weight with just 4 1/2"
DP after pipe full
30 RPM 12K 172K Rot WT
Flow check - 15 min
20,097.0 20,097.0
4/5/2023
07:45
4/5/2023
09:15
1.50 PROD1, STK MPDA X PJSM, pull 4 1/2" bearing and install 5
7/8" bearing
Pump 100 GPM 950 PSI
215K UP
140K DN
20,097.0 20,097.0
4/5/2023
09:15
4/5/2023
09:45
0.50 PROD1, STK SMPD X Strip in the hole with 5 7/8" DP F/20,097'
T/20,392'
As per Beyond schedule, holding 12.5
PPG EMW at toe
121K DN
20,097.0 20,392.0
4/5/2023
09:45
4/5/2023
10:45
1.00 PROD1, STK OTHR X Perform NOVOS TQ test for calibration
prior exit liner
20,392.0 20,392.0
4/5/2023
10:45
4/5/2023
13:30
2.75 PROD1, STK SMPD X Strip in the hole with 5 7/8" DP F/20,392'
T/22,568', taking weight
As per Beyond schedule, holding 12.5
PPG EMW at toe
121K DN
20,392.0 22,568.0
4/5/2023
13:30
4/5/2023
15:00
1.50 PROD1, STK CIRC X Stacked out at 22,568', attempt to work
thru w/o success, fill pipe, start
pump/rotary staging up pump rate to
200 gpm, was not getting full returns,
reduced flow rate to 50 gpm/ 782 psi to
get full returns. 20 rpm/9K Tq
22,568.0 22,568.0
4/5/2023
15:00
4/5/2023
16:45
1.75 PROD1, STK BKRM X BROOH F/22,568' T/22,239'
75 gpm at 831 psi
20 rpm at 12K Tq
186K ROT
22,568.0 22,239.0
4/5/2023
16:45
4/5/2023
18:00
1.25 PROD1, STK CIRC X Stage up pump rate to 120 gpm, 1021
psi. 30 RPM, 11K tq
No losses
22,239.0 22,239.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 110/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/5/2023
18:00
4/6/2023
00:00
6.00 PROD1, STK CIRC X Continue stage pump rate up to 250
gpm, 2346 psi, 30 RPM, 10K Tq, ECD
13.0. Max gas 74 units.
Circ out heavy mud, 12.6 max out
No losses
22,239.0 22,239.0
4/6/2023
00:00
4/6/2023
06:00
6.00 PROD1, STK REAM X Ream in hole F/22,239' T/22,250'
240 GPM, 2223 psi
60 RPM, 16K Tq
192K Rot Wt
Maintaining 13.0 ECD
22,239.0 23,252.0
4/6/2023
06:00
4/6/2023
14:45
8.75 PROD1, STK DISP X Circ and reciprocate. 40 RPM, 14K Tq.
PJSM, Displace well over to 11.1 ppg
FloPro mud as per Mud Engineer and
Beyond schedule. Pump 100 bbls 14.6
ppg spacer followed by 11.1 ppg FloPro
to surface. ECD 12.6 to13.11, 210 to
260 GPM, 2070 to 2450 psi
23,252.0 23,252.0
4/6/2023
14:45
4/6/2023
15:00
0.25 PROD1, STK DISP X Obtain SPR's and rotating weight
20 RPM, 11K Tq
190K Rot Wt
23,252.0 23,252.0
4/6/2023
15:00
4/7/2023
00:00
9.00 PROD1, STK REAM X Ream in hole F/23,252' T/26,405'
240 GPM, 2269 psi
30 RPM, 14K Tq
192K Rot Wt
Holding 12.5 EMW
Max gas 20 units
23,252.0 26,405.0
4/7/2023
00:00
4/7/2023
04:15
4.25 PROD1, STK REAM X Ream in hole F/26,405' T/27,240'
240 GPM, 2269 psi
30 RPM, 14K Tq
192K Rot Wt
Holding 12.6 EMW
Max gas 20 units
26,405.0 27,240.0
4/7/2023
04:15
4/7/2023
06:00
1.75 PROD1, STK DDRL X Obtain T&D, SPR's. Drill 6 3/4" hole
F/27,240' T/27,311' while maintaining
12.6 PPG EMW on connections at the 7
5/8" shoe with MPD.
264 GPM
2603 PSI
100 RPM
29K TQ on 29K off
5K WOB
12.58 ECD
P/U - 296K
S/O - N/A
ROT- 206K
49 Units Max Gas
AVG = 41 FPH W/connections
ADT= 1.68
Bit HRS= 1.68
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
27,240.0 27,311.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 111/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/7/2023
06:00
4/7/2023
12:00
6.00 PROD1, STK DDRL X Drill 6 3/4" hole F/27,311' T/27,426'
while maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
264 GPM
2662 PSI
100 RPM
31K TQ on 31K off
5K WOB
12.76 ECD
P/U - 296K
S/O - N/A
ROT- 206K
294 Units Max Gas
AVG = 19.2 FPH W/connections
ADT= 3.52
Bit HRS= 5.2
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
27,311.0 27,426.0
4/7/2023
12:00
4/7/2023
18:00
6.00 PROD1, STK DDRL X Drill 6 3/4" hole F/27,426' T/27,706'
while maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
260 GPM
2652 PSI
100 RPM
29K TQ on 29K off
7.5K WOB
12.7 ECD
P/U - 301K
S/O - N/A
ROT- 207K
99 Units Max Gas
AVG = 46.7 FPH W/connections
ADT= 4.14
Bit HRS= 9.45
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
27,426.0 27,706.0
4/7/2023
18:00
4/8/2023
00:00
6.00 PROD1, STK DDRL X Drill 6 3/4" hole F/27,706' T/28,161'
while maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
264 GPM
2718 PSI
100 RPM
30K TQ on 28K off
14K WOB
12.73 ECD
P/U - 300K
S/O - N/A
ROT- 210K
173 Units Max Gas
AVG = 75.8 FPH W/connections
ADT= 4.4
Bit HRS= 13.85
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
27,706.0 28,161.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 112/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/8/2023
00:00
4/8/2023
06:00
6.00 PROD1, STK DDRL X Drill 6 3/4" hole F/28,161' T/28,446'
while maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM, 2798 PSI
100 RPM
28K TQ on 26K off
10K WOB
12.82 ECD
P/U - 300K, S/O - N/A, ROT- 210K
180 Units Max Gas
AVG = 47.5 FPH W/connections
ADT= 4.53
Bit HRS= 18.38
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
28,161.0 28,446.0
4/8/2023
06:00
4/8/2023
12:00
6.00 PROD1, STK DDRL X Drill 6 3/4" hole F/28,446' T/28,816'
while maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM , 2736 PSI
90-100 RPM
27K TQ on 23K off
5-20K WOB
12.84 ECD
P/U - 298K, S/O - N/A, ROT- 211K
238 Units Max Gas
AVG = 61.7 FPH W/connections
ADT= 4.41
Bit HRS= 22.77
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
28,446.0 28,816.0
4/8/2023
12:00
4/8/2023
14:00
2.00 PROD1, STK DDRL X Drill 6 3/4" hole F/28,816' T/28,947'
while maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM , 2729 PSI
100 RPM
26-29K TQ on 26K off
4-8K WOB
12.85 ECD
P/U - 298K, S/O - N/A, ROT- 211K
147 Units Max Gas
AVG = 65.5 FPH W/connections
ADT= 1.7
Bit HRS= 24.47
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
28,816.0 28,947.0
4/8/2023
14:00
4/8/2023
15:00
1.00 PROD1, STK CIRC X Circulate and reciprocate while discuss
geologic steering
200 gpm, 1830 psi
30 rpm, 15-17K Tq
207K PUW, 192K Rot Wt
28,947.0 28,947.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 113/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/8/2023
15:00
4/8/2023
18:00
3.00 PROD1, STK DDRL X Drill 6 3/4" hole F/28,947' T/29,030'
while maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM , 2729 PSI
100 RPM
26-29K TQ on 26K off
4-8K WOB
12.85 ECD
P/U - 298K, S/O - N/A, ROT- 211K
147 Units Max Gas
AVG = 27.7 FPH W/connections
ADT= 2.54
Bit HRS= 27.01
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
28,947.0 29,030.0
4/8/2023
18:00
4/9/2023
00:00
6.00 PROD1, STK DDRL X Drill 6 3/4" hole F/29,.030' T/29,269'
while maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM , 2802 PSI
90-100 RPM
26-30K TQ on 26K off
12K WOB
12.83 ECD
P/U - 298K, S/O - N/A, ROT- 211K
35 Units Max Gas
AVG = 39.8 FPH W/connections
ADT= 5.23
Bit HRS= 32.24
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
29,030.0 29,269.0
4/9/2023
00:00
4/9/2023
06:00
6.00 PROD1, STK DDRL X Drill 6 3/4" hole F/29.269' T/29,540'
while maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM , 2850 PSI
120 RPM
32K TQ on 28K off
18K WOB
12.96 ECD
P/U - 300K, S/O - N/A, ROT- 205K
35 Units Max Gas
AVG = 45.2 FPH W/connections
ADT= 4.77
Bit HRS= 37.01
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
29,269.0 29,540.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 114/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/9/2023
06:00
4/9/2023
12:00
6.00 PROD1, STK DDRL X Drill 6 3/4" hole F/29.540' T/29,720'
while maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM , 2862 PSI
110 RPM
30K TQ on 28K off
11K WOB
12.94 ECD
P/U - 322K, S/O - N/A, ROT- 215K
25 Units Max Gas
AVG = 30 FPH W/connections
ADT= 4.59
Bit HRS= 41.78
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
29,540.0 29,720.0
4/9/2023
12:00
4/9/2023
18:45
6.75 PROD1, STK DDRL X Drill 6 3/4" hole F/29.720' T/29,930'
while maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM , 2846 PSI
110 RPM
30K TQ on 28K off
11K WOB
13.0 ECD
P/U - 322K, S/O - N/A, ROT- 215K
25 Units Max Gas
AVG = 31.1 FPH W/connections
ADT= 6.1
Bit HRS= 47.88
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
29,720.0 29,930.0
4/9/2023
18:45
4/9/2023
19:15
0.50 PROD1, STK SVRG X Service rig. Grease/inspect traveling
blocks, Top Drive, upper/lower IBOP,
grease washpipe.
29,930.0 29,930.0
4/9/2023
19:15
4/10/2023
00:00
4.75 PROD1, STK DDRL X Drill 6 3/4" hole F/29.930' T/30,214'
while maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 GPM , 2886 PSI
110 RPM
30K TQ on 28K off
4K WOB
12.96 ECD
P/U - 318K, S/O - N/A, ROT- 211K
23 Units Max Gas
AVG = 59.8 FPH W/connections
ADT= 4.47
Bit HRS= 51.6
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low
29,930.0 30,214.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 115/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/10/2023
00:00
4/10/2023
06:00
6.00 PROD1, STK DDRL X Drill 6 3/4" production hole from 30,214'-
30,502' MD, 7207' TVD, while
maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 gpm , 3020 psi on
110 rpm
31K TQ on, 28K off
10K WOB
13.17 ECD
P/U - 322K, S/O - N/A, ROT- 214K
303 Units Max Gas
AVG = 48 FPH W/connections
ADT= 4.51
Bit HRS= 56.11
Pump 40 BBL anti-jamming sweeps
every 6 HRS, to keep possum numbers
low.
30,214.0 30,502.0
4/10/2023
06:00
4/10/2023
12:00
6.00 PROD1, STK DDRL X Drill 6 3/4" production hole from 30,502'-
30,672' MD, 7204' TVD, while
maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 gpm , 3015 psi on
100 rpm
31K TQ on, 28K off
10K WOB
13.09 ECD
P/U - 322K, S/O - N/A, ROT- 214K
294 Units Max Gas
AVG = 28.3 FPH W/connections
ADT= 5.61
Bit HRS= 61.72
Pump 40 BBL anti-jamming sweeps
every 6 HRS, to keep possum numbers
low.
30,502.0 30,672.0
4/10/2023
12:00
4/10/2023
18:00
6.00 PROD1, STK DDRL X Drill 6 3/4" production hole from 30,672'-
30,982' MD, 7196' TVD, while
maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 gpm , 2977 psi on
90-110 rpm
35K TQ on, 32K off
10K WOB
13.12 ECD
P/U - 326K, S/O - N/A, ROT- 214K
74 Units Max Gas
AVG = 51.6 FPH W/connections
ADT= 4.66
Bit HRS= 66.38
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low.
Perform 200 bbls dump and dilute at
30,950' MD.
30,672.0 30,982.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 116/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/10/2023
18:00
4/11/2023
00:00
6.00 PROD1, STK DDRL X Drill 6 3/4" production hole from 30,982'-
31,204' MD, 7192' TVD, while
maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
263 gpm , 2934 psi on
100 rpm
34K TQ on, 30K off
15K WOB
13.07 ECD
P/U - 326K, S/O - N/A, ROT- 214K
74 Units Max Gas
AVG = 37 FPH W/connections
ADT= 4.76
Bit HRS= 71.14
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low.
Perform 275 bbls dump and 345 bbls
dilute at 31,138' MD.
30,982.0 31,204.0
4/11/2023
00:00
4/11/2023
06:00
6.00 PROD1, STK DDRL X Drill 6 3/4" production hole from 31,204'
- 31,530' MD, 7186' TVD, while
maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 gpm , 2934 psi on
100 rpm
34K TQ on, 30K off
15K WOB
13.16 ECD
P/U - 325K, S/O - N/A, ROT- 209K
930 Units Max Gas
AVG = 54.3 FPH W/connections
ADT= 4.66
Bit HRS= 75.80
Pump 40 BBL anti jamming sweeps
every 6 HRS, to keep possum numbers
low.
31,204.0 31,530.0
4/11/2023
06:00
4/11/2023
12:00
6.00 PROD1, STK DDRL X Drill 6 3/4" production hole from 31,530'
- 31,828' MD, 7179' TVD, while
maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 gpm , 2988 psi on
100 rpm
35K TQ on, 32K off
8K WOB
13.17 ECD
P/U - 325K, S/O - N/A, ROT- 209K
1521 Units Max Gas
AVG = 49.6 FPH W/connections
ADT= 4.95
Bit HRS= 80.75
Pump 40 BBL anti jamming sweep every
6 HRS, to keep possum numbers low.
31,530.0 31,828.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 117/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/11/2023
12:00
4/11/2023
18:00
6.00 PROD1, STK DDRL X Drill 6 3/4" production hole from 31,828'
- 32,007' MD, 7185' TVD, while
maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 gpm , 2965 psi on
100 rpm
33K TQ on, 30K off
10K WOB
13.15 ECD
P/U - 326K, S/O - N/A, ROT- 216K
1904 Units Max Gas
AVG = 29.8 FPH W/connections
ADT= 5.19
Bit HRS= 85.94
Pump 40 BBL anti jamming sweep every
6 HRS, to keep possum numbers low.
31,828.0 32,007.0
4/11/2023
18:00
4/12/2023
00:00
6.00 PROD1, STK DDRL X Drill 6 3/4" production hole from 32,007'
- 32,067' MD, 7185' TVD, while
maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 gpm , 2947 psi on
100 rpm
33K TQ on, 30K off
6.5K WOB
13.13 ECD
P/U - 326K, S/O - N/A, ROT- 216K
50 Units Max Gas
AVG = 10 FPH W/connections
ADT= 5.79
Bit HRS= 91.73
Pump 40 BBL anti jamming sweep every
6 HRS, to keep possum numbers low.
32,007.0 32,067.0
4/12/2023
00:00
4/12/2023
06:00
6.00 PROD1, STK DDRL X Drill 6 3/4" production hole from 32,067'
- 32,346' MD, 7193' TVD, while
maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 gpm , 2911 psi on
100 rpm
37K TQ on, 34K off
10K WOB
13.19 ECD
P/U - 326K, S/O - N/A, ROT- 216K
95 Units Max Gas
AVG = 46.5 FPH W/connections
ADT= 5.16
Bit HRS= 96.89
Pump 40 BBL anti-jamming sweep
every 6 HRS, to keep possum numbers
low.
32,067.0 32,346.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 118/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/12/2023
06:00
4/12/2023
12:00
6.00 PROD1, STK DDRL X Drill 6 3/4" production hole from 32,346'
- 32,717' MD, 7199' TVD, while
maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 gpm , 2900 psi on
100 rpm
36K TQ on, 32K off
5-8K WOB
13.22 ECD
P/U - 327K, S/O - N/A, ROT- 213K
246 Units Max Gas
AVG = 61.8 FPH W/connections
ADT= 4.30
Bit HRS= 101.19
Pump 40 BBL anti-jamming sweep
every 6 HRS, to keep possum numbers
low.
32,346.0 32,717.0
4/12/2023
12:00
4/12/2023
18:00
6.00 PROD1, STK DDRL X Drill 6 3/4" production hole from 32,717'
- 33,107' MD, 7193' TVD, while
maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 gpm , 2932 psi on
100 rpm
38K TQ on, 36K off
5-8K WOB
13.34 ECD
P/U - 336K, S/O - N/A, ROT- 216K
257 Units Max Gas
AVG = 65 FPH W/connections
ADT= 4.61
Bit HRS= 105.8
Pump 40 BBL anti-jamming sweep
every 6 HRS, to keep possum numbers
low.
32,717.0 33,107.0
4/12/2023
18:00
4/13/2023
00:00
6.00 PROD1, STK DDRL X Drill 6 3/4" production hole from 33,107'
- 33,352' MD, 7187' TVD, while
maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 gpm , 2976 psi on
100 rpm
37K TQ on, 34K off
6K WOB
13.29 ECD
P/U - 336K, S/O - N/A, ROT- 216K
276 Units Max Gas
AVG = 40.8 FPH W/connections
ADT= 5.39
Bit HRS= 111.19
Pump 40 BBL anti-jamming sweep
every 6 HRS, to keep possum numbers
low.
33,107.0 33,352.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 119/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/13/2023
00:00
4/13/2023
06:00
6.00 PROD1, STK DDRL X Drill 6 3/4" production hole from 33,352'
- 33,671' MD, 7198' TVD, while
maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 gpm , 2985 psi on
100 rpm
36K TQ on, 34K off
8K WOB
13.4 ECD
P/U - 334K, S/O - N/A, ROT- 217K
107 Units Max Gas
AVG = 53.2 FPH W/connections
ADT= 3.89
Bit HRS= 115.08
Pump 40 BBL anti-jamming sweep
every 6 HRS, to keep possum numbers
low.
33,352.0 33,671.0
4/13/2023
06:00
4/13/2023
12:00
6.00 PROD1, STK DDRL X Drill 6 3/4" production hole from 33,671'
- 34,053' MD, 7192' TVD, while
maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 gpm , 2995 psi on
92 rpm
39K TQ on, 36K off
10K WOB
13.44 ECD
P/U - 360K, S/O - N/A, ROT- 217K
270 Units Max Gas
AVG = 63.6 FPH W/connections
ADT= 3.82
Bit HRS= 119.35
Pump 40 BBL anti-jamming sweep
every 6 HRS, to keep possum numbers
low.
33,671.0 34,053.0
4/13/2023
12:00
4/13/2023
18:00
6.00 PROD1, STK DDRL X Drill 6 3/4" production hole from 34,053'
- 34,372' MD, 7191' TVD, while
maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 gpm , 3016 psi on
90 rpm
32K TQ on, 31K off
15-20K WOB
13.46 ECD
P/U - 362K, S/O - N/A, ROT- 217K
239 Units Max Gas
AVG = 53.2 FPH W/connections
ADT= 4.83
Bit HRS= 124.18
Pump 40 BBL anti-jamming sweep
every 6 HRS, to keep possum numbers
low.
34,053.0 34,372.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 120/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/13/2023
18:00
4/13/2023
20:15
2.25 PROD1, STK DDRL X Drill 6 3/4" production hole from 34,372'
- 34,487' MD, 7184' TVD, while
maintaining 12.6 PPG EMW on
connections at the 7 5/8" shoe with
MPD.
265 gpm , 3016 psi on
90 rpm
32K TQ on, 31K off
15-20K WOB
13.46 ECD
P/U - 362K, S/O - N/A, ROT- 217K
239 Units Max Gas
AVG = 53.2 FPH W/connections
ADT= 1.61
Bit HRS= 125.79
34,372.0 34,487.0
4/13/2023
20:15
4/14/2023
00:00
3.75 PROD1, TRIPCAS CIRC P Rack back stand 367. Obtain final
torque & drag data. Obtain slow
circulating rates. Pump sweep of 40 bbls
high vis & 40 bbls low vis. Circulate &
condition at 265 gpm, 3005 psi, 100
rpm, Tq 34K, ECD 13.36, PU 360K, SO
N/A, ROT 218K, max gas 50.
34,487.0 34,478.0
4/14/2023
00:00
4/14/2023
05:00
5.00 PROD1, TRIPCAS CIRC P Circulate & condition at 265 gpm, 3005
psi, 100 rpm, Tq 34K, ECD 13.36, PU
360K, SO N/A, ROT 218K, max gas
125, total strokes pumped 24,390.
34,478.0 34,478.0
4/14/2023
05:00
4/14/2023
05:30
0.50 PROD1, TRIPCAS OWFF P Blow down top drive & grease wash
pipe. Prep for drawdown, line up on trip
tank 2 and flood flow line to trip tank.
34,478.0 34,478.0
4/14/2023
05:30
4/14/2023
06:15
0.75 PROD1, TRIPCAS OWFF P Perform static drawdown to 12.3 ppg
EMW; 454 psi; 11.1 ppg; 7184' TVD.
Bled back 2.2 bbls to the trip tank.
10 rpm, Tq 18K, ROT 228K
Start with 490 psi on MPD. Trip tank
volume = 11.6 bbls initial; 13.8 bbls final
All step are choke 25% open for 5
seconds and monitor for 5 min
#1 draw down - 490 to 451 psi; 5 min =
462 psi, pit gain = .5 bbls,
#2 draw down - 462 to 354 psi; 5 min =
452 psi, pit gain = .5 bbls,
#3 draw down - 454 to 367 psi; 5 min =
450 psi, pit gain = .4 bbls,
#4 draw down - 453 to 397 psi; 5 min =
454 psi, pit gain = .4 bbls,
34,478.0 34,478.0
4/14/2023
06:15
4/14/2023
12:00
5.75 PROD1, TRIPCAS CIRC P Circulate & condition at 265 gpm, 3000
psi, 90 rpm, Tq 30K, ECD 13.31, PU
360K, SO N/A, ROT 218K, max gas 71.
34,478.0 34,478.0
4/14/2023
12:00
4/14/2023
18:00
6.00 PROD1, TRIPCAS BKRM P Backream out of the hole from 34,478'-
33,200' MD, holding an 12.6 ppg EMW
at the shoe.
265 gpm, 2850 psi
120 rpm, Tq 37K
ECD 13.24
PU ROT 206K
ROT 197K
Max gas 25
34,478.0 33,200.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 121/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/14/2023
18:00
4/14/2023
23:30
5.50 PROD1, TRIPCAS BKRM P Backream out of the hole from 33,200'-
32,070' MD, holding an 12.6 ppg EMW
at the shoe.
265 gpm, 2830 psi
90-110 rpm, Tq 29K
ECD 13.22
PU ROT 206K
ROT 199K
Max gas 25
33,200.0 32,070.0
4/14/2023
23:30
4/15/2023
00:00
0.50 PROD1, TRIPCAS SVRG P Service top drive & tighten shot pin
bolts. Service ST-120.
32,070.0 32,070.0
4/15/2023
00:00
4/15/2023
06:00
6.00 PROD1, TRIPCAS BKRM P Backream out of the hole from 32,070'-
30,577' MD, holding an 12.6 ppg EMW
at the shoe.
265 gpm, 2790 psi
90-110 rpm, Tq 27K
ECD 13.04
PU ROT 205K
ROT 199K
Max gas 27
32,070.0 30,577.0
4/15/2023
06:00
4/15/2023
12:00
6.00 PROD1, TRIPCAS BKRM P Backream out of the hole from 30,577'-
29,670' MD, holding an 12.6 ppg EMW
at the shoe. Observe pressure
increases with 50-150 psi at 30,429';
30,387'; 30,165' MD.
265 gpm, 2750 psi
90-120 rpm, Tq 22-27K
ECD 12.98
PU ROT 205K
ROT 199K
Max gas 24
30,577.0 29,670.0
4/15/2023
12:00
4/15/2023
18:00
6.00 PROD1, TRIPCAS BKRM P Backream out of the hole from 29,670'-
28,260' MD, holding an 12.6 ppg EMW
at the shoe.
265 gpm, 2490 psi
90 rpm, Tq 20-24K
ECD 12.87
PU ROT 203K
ROT 198K
Max gas 25
29,670.0 28,260.0
4/15/2023
18:00
4/16/2023
00:00
6.00 PROD1, TRIPCAS BKRM P Backream out of the hole from 28,260'-
26,775' MD, holding an 12.6 ppg EMW
at the shoe.
265 gpm, 2570 psi
90 rpm, Tq 24K
ECD 12.87
PU ROT 201K
ROT 197K
Max gas 25
28,260.0 26,775.0
4/16/2023
00:00
4/16/2023
06:00
6.00 PROD1, TRIPCAS BKRM P Backream out of the hole from 26,775'-
25,008' MD, holding an 12.6 ppg EMW
at the shoe.
265 gpm, 2510 psi
90 rpm, Tq 21K
ECD 12.67
PU ROT 202K
ROT 195K
Max gas 19
26,775.0 25,008.0
4/16/2023
06:00
4/16/2023
12:00
6.00 PROD1, TRIPCAS BKRM P Backream out of the hole from 25,008'-
23,508' MD, holding an 12.6 ppg EMW
at the shoe.
265 gpm, 2516 psi
90 rpm, Tq 15-18K
ECD 12.61
PU ROT 195K
ROT 185K
Max gas 16
25,008.0 23,508.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 122/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/16/2023
12:00
4/16/2023
18:00
6.00 PROD1, TRIPCAS BKRM P Backream out of the hole from 23,508'-
22,042' MD, holding an 12.6 ppg EMW
at the shoe.
265 gpm, 2516 psi
90 rpm, Tq 13-16K
ECD 12.27
PU ROT 188K
ROT 182K
Max gas 16
23,508.0 22,042.0
4/16/2023
18:00
4/17/2023
00:00
6.00 PROD1, TRIPCAS BKRM P Backream out of the hole from 22,042'-
20,968' MD, holding an 12.6 ppg EMW
at the shoe. Work through & clean up
21,108'-20,968' MD with increased
torque & pressure.
265 gpm, 2360 psi
90-110 rpm, Tq 18K
ECD 12.58
PU ROT 180K
ROT 173K
Max gas 10
22,042.0 20,968.0
4/17/2023
00:00
4/17/2023
05:00
5.00 PROD1, TRIPCAS BKRM P Backream out of the hole from 20,968'-
20,379' MD, holding an 12.6 ppg EMW
at the shoe. Work through & clean up
20,968'-20,926' MD with increased
torque.
265 gpm, 2360 psi
90 rpm, Tq 16K
ECD 12.55
PU ROT 174K
ROT 169K
Max gas 10
20,968.0 20,379.0
4/17/2023
05:00
4/17/2023
10:45
5.75 PROD1, TRIPCAS CIRC P Circulate bottoms up at 20,379' MD,
holding an 12.6 ppg EMW at the shoe.
SIMOPS repair ST-120.
265 gpm, 2345 psi
30 rpm, Tq 7-8K
ECD 12.54
PU 224K
SO 120K
ROT 165K
Max gas 0
20,379.0 20,379.0
4/17/2023
10:45
4/17/2023
14:00
3.25 PROD1, TRIPCAS SLPC P Cut and slip 47' of drilling line. SIMOPS
repair ST-120, change out bolts on top
drive shot pin, inspect drawworks &
brakes.
20,379.0 20,379.0
4/17/2023
14:00
4/17/2023
14:45
0.75 PROD1, TRIPCAS SVRG P Change out swivel packing on the top
drive. SIMOPS repair ST-120
20,379.0 20,379.0
4/17/2023
14:45
4/17/2023
16:30
1.75 PROD1, TRIPCAS SLPC P Remove block hanging line and
calibrate drawworks. Perform block
height & weight calibration. Blow down
top drive, service blocks & top drive.
Inspect saver sub. SIMOPS repair ST-
120
20,379.0 20,379.0
4/17/2023
16:30
4/17/2023
21:00
4.50 PROD1, TRIPCAS SVRG P Change out saver sub & grabber dies.
Grease upper & lower IBOPs. SIMOPS
repair ST-120 & perform weekly derrick
inspection.
20,379.0 20,379.0
4/17/2023
21:00
4/18/2023
00:00
3.00 PROD1, TRIPCAS MPDA P Change out RCD per Advisor. Maintain
12.6 ppg EMW at the shoe with 556 psi
while change out bearing. Line up to
mud pump 3 and fluid pack MPD lines.
Establish circulation across the top with
MPD to hold 12.6 ppg EMW
dynamically.
20,379.0 20,379.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 123/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/18/2023
00:00
4/18/2023
01:00
1.00 PROD1, TRIPCAS SEQP P Pressure test top drive swivel packing to
3500 psi, good. Blow down top drive.
SIMOPS prep pits for trip in the hole,
change out a liner &2 swabs on mud
pump #4.
Obtain torque & drag per town.
PU 224K
SO113K
ROT 165K
30 rpm = Tq 9K
20 spm
20,379.0 20,379.0
4/18/2023
01:00
4/18/2023
06:00
5.00 PROD1, TRIPCAS SMPD P Strip in the hole from 20,379'-22,416'
MD, holding an 12.6 ppg EMW at the
shoe. Set down 20K 3 times at 22,416'
MD. SIMOPS change out liner, 2 swabs
& wiper seals on mud pump #4.
PU 224K
SO 113K
ROT 165K
30 rpm = Tq 9K
20,379.0 22,416.0
4/18/2023
06:00
4/18/2023
07:45
1.75 PROD1, TRIPCAS REAM P Wash & ream in the hole from 22,416'-
22,688' MD, holding an 12.6 ppg EMW
at the shoe.
148 gpm
1220 psi
10 rpm = Tq 9K
SO ROT 165K
ROT 190K
22,416.0 22,688.0
4/18/2023
07:45
4/18/2023
08:15
0.50 PROD1, TRIPCAS SMPD P Strip in the hole from 22,688'-22,786'
MD, holding an 12.6 ppg EMW at the
shoe. Obtain torque & drag at 22,689'
MD
PU 260K
SO 108-120K
ROT 185K
30 rpm = Tq 10-11K
22,688.0 22,786.0
4/18/2023
08:15
4/18/2023
08:30
0.25 PROD1, TRIPCAS RURD P Install PS-21 slips in the rotary table. 22,786.0 22,786.0
4/18/2023
08:30
4/18/2023
10:45
2.25 PROD1, TRIPCAS SMPD P Strip in the hole from 22,786'-23,980'
MD, holding an 12.6 ppg EMW at the
shoe.
SO 110-120K
22,786.0 23,980.0
4/18/2023
10:45
4/18/2023
11:15
0.50 PROD1, TRIPCAS SRVY P Pump up survey to ensure BHA is in the
main wellbore.
225 gpm
1755 psi
23,980.0 23,980.0
4/18/2023
11:15
4/18/2023
12:15
1.00 PROD1, TRIPCAS SMPD P Strip in the hole from 23,980'-24,295'
MD, holding an 12.6 ppg EMW at the
shoe.
SO 110-120K
23,980.0 24,295.0
4/18/2023
12:15
4/18/2023
12:30
0.25 PROD1, TRIPCAS REAM P Wash & ream in the hole due to loss of
weight from 24,295'-24,361' MD, holding
an 12.6 ppg EMW at the shoe.
150 gpm
1310 psi
20 rpm = Tq 11-12K
SO ROT 185K
24,295.0 24,361.0
4/18/2023
12:30
4/18/2023
13:00
0.50 PROD1, TRIPCAS SMPD P Strip in the hole from 24,361'-24,435'
MD, holding an 12.6 ppg EMW at the
shoe.
SO 110-120K
24,361.0 24,435.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 124/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/18/2023
13:00
4/18/2023
22:15
9.25 PROD1, TRIPCAS REAM P Wash & ream in the hole due to loss of
weight from 24,435'-26,222' MD, holding
an 12.6 ppg EMW at the shoe.
250 gpm
2250 psi
60 rpm = Tq 17K
SO ROT 190K
ECD 12.68
Torque & drag at 24,542' MD
30 rpm = Tq 15K
PU 295K
SO ROT 168K
ROT193K
24,435.0 26,222.0
4/18/2023
22:15
4/18/2023
22:45
0.50 PROD1, TRIPCAS SVRG P Service rig - grease the swivel packing
& top drive; change out 3" bleeder valve
on the mud manifold.
26,222.0 26,222.0
4/18/2023
22:45
4/19/2023
00:00
1.25 PROD1, TRIPCAS REAM P Wash & ream from 26,222'-26,501' MD,
holding an 12.6 ppg EMW at the shoe.
250 gpm
2250 psi
60 rpm = Tq 17K
SO ROT 190K
ECD 12.68
26,222.0 26,501.0
4/19/2023
00:00
4/19/2023
06:00
6.00 PROD1, TRIPCAS REAM P Wash & ream from 26,501'-28,130' MD,
holding an 12.6 ppg EMW at the shoe.
250 gpm
2450 psi
60 rpm = Tq 19K
SO ROT 189K
ROT 205K
ECD 12.81
26,501.0 28,130.0
4/19/2023
06:00
4/19/2023
12:00
6.00 PROD1, TRIPCAS REAM P Wash & ream from 28,130'-29,561' MD,
holding an 12.6 ppg EMW at the shoe.
Observed 100 psi increase at 29,425'
MD, slow running speed to 300 fph.
250 gpm
2430 psi
60 rpm = Tq 20-23K
SO ROT 198K
ROT 204K
ECD 12.5
28,130.0 29,561.0
4/19/2023
12:00
4/19/2023
18:00
6.00 PROD1, TRIPCAS REAM P Wash & ream from 29,561'-30,582' MD,
holding an 12.6 ppg EMW at the shoe.
Slowed running speed as needed for
DLS.
250 gpm
2520 psi
60 rpm = Tq 21-25K
SO ROT 198K
ROT 202K
ECD 12.98
29,561.0 30,582.0
4/19/2023
18:00
4/20/2023
00:00
6.00 PROD1, TRIPCAS REAM P Wash & ream from 30,582'-32,446' MD,
holding an 12.6 ppg EMW at the shoe.
Slowed running speed as needed for
DLS.
250 gpm
2602 psi
60 rpm = Tq 23K
SO ROT 190K
ROT 215K
ECD 13.18
30,582.0 32,446.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 125/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/20/2023
00:00
4/20/2023
06:45
6.75 PROD1, TRIPCAS REAM P Wash & ream from 32,446'-34,480' MD,
holding an 12.6 ppg EMW at the shoe.
250 gpm
2750 psi
60 rpm = Tq 27K
SO ROT 192K
ROT 215K
ECD 13.40
32,446.0 34,480.0
4/20/2023
06:45
4/20/2023
15:00
8.25 PROD1, TRIPCAS CIRC P Circulate & reciprocate at 34,480' MD,
holding an 12.6 ppg EMW at the shoe.
Prep pits for displacement, cleaning pits
4 & 5, transferring fluids between tank
farm & pits.
265 gpm
2650 psi
40-60 rpm = Tq 22-23K
ECD 13.29
PU ROT 210K
SO ROT 199K
34,480.0 34,480.0
4/20/2023
15:00
4/21/2023
00:00
9.00 PROD1, TRIPCAS DISP P Perform displacement from 11.1 ppg
FloPro to 12.8 ppg Potassium Formate
brine at 34,480' MD reciprocating.
Adjust pump rate and MPD back
pressure per rollover schedule. Observe
spacer start to come back at 2897 bbls
pumped. Pumped 2907bbls at 24:00
hrs.
250 - 100 gpm
2440 - 460 psi
80 rpm = Tq 33 - 46K
MPD Back pressure 530 - 0 psi
ECD
PU ROT 219K
SO ROT 216K
ROT 212K
34,480.0 34,480.0
4/21/2023
00:00
4/21/2023
01:45
1.75 PROD1, TRIPCAS DISP P Continue displacement from 11.1 ppg
FloPro to 12.8 ppg Potassium Formate
brine at 34,480' MD reciprocating.
Adjust pump rate and MPD back
pressure per rollover schedule.
Continued pumping from 2907bbls to
3315 bbls to see 12.6 ppg brine at
surface. Observed 300 bbls of interface.
Calculated was 200 bbls of interface.
Recovered 116 bbls of the interface to
be reconditioned and reused.
200 gpm
1350 psi
80 rpm = Tq 47K
MPD Back pressure 0 psi
PU ROT 219K
SO ROT 215K
ROT 216K
34,480.0 34,480.0
4/21/2023
01:45
4/21/2023
02:30
0.75 PROD1, TRIPCAS BKRM P Backream from 34,480'-34,390' MD,
racking a stand back in the derrick.
225 gpm
1850 psi
60 rpm = Tq 43K
PU ROT 220K
ECD 13.31
34,480.0 34,390.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 126/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/21/2023
02:30
4/21/2023
10:30
8.00 PROD1, TRIPCAS CIRC P Circulate bottoms up at 34,390' MD.
Obtain SCRs.
225 gpm
1875 psi
60 rpm = Tq 42K
ECD 13.29
Obtain torque & drag at 34,380' MD
99 gpm = 425 psi
30 rpm = Tq 32K; BO @ 39K
20 fpm
PU 460K; BO @ 468K
SO N/A
ROT 227K
34,390.0 34,390.0
4/21/2023
10:30
4/21/2023
11:30
1.00 PROD1, TRIPCAS CIRC P Circulate bottoms up at 34,390' MD.
Obtain SCRs.
225 gpm
1875 psi
60 rpm = Tq 42K
ECD 13.29
Obtain torque & drag at 34,385' MD
99 gpm = 425 psi
30 rpm = Tq 29K; Rotate down 25K
20 fpm
PU 446K
ROT SO 200K
ROT 232K
34,390.0 34,390.0
4/21/2023
11:30
4/21/2023
12:45
1.25 PROD1, TRIPCAS OWFF P Monitor well. Observe slight flow to
static. Observed well static 30 minutes.
SIMOPS blow down top drive.
34,390.0 34,390.0
4/21/2023
12:45
4/21/2023
21:00
8.25 PROD1, TRIPCAS SMPD P Strip out of the hole with MPD to offset
swab from 34,390' - 29,300' MD.
PU 320K
750-1500 fph
34,390.0 29,300.0
4/21/2023
21:00
4/22/2023
00:00
3.00 PROD1, TRIPCAS SMPD P Strip out of the hole with MPD to offset
swab from 29,300' - 27,523' MD.
PU 269K
1000-1500 fph
Obtain torque & drag at 29,004' MD
No pump
30 rpm = Tq 20K; BO @ 21K; Rotate
down 16K
20 fpm
PU 320K
ROT SO 187K
ROT 216K
29,300.0 27,523.0
4/22/2023
00:00
4/22/2023
09:00
9.00 PROD1, TRIPCAS SMPD P Strip out of the hole from 27,523' -
20,189' MD.
PU 241K
1500 fph
Obtain torque & drag at 20,375' MD
No pump
30 rpm = Tq 10K
20 fpm
PU 236K
SO 142K
ROT 182K
27,523.0 20,189.0
4/22/2023
09:00
4/22/2023
09:30
0.50 PROD1, TRIPCAS OWFF P Monitor well, static. SIMOPS rotate
wash pipe & prep for RCD removal.
20,189.0 20,189.0
4/22/2023
09:30
4/22/2023
10:15
0.75 PROD1, TRIPCAS MPDA P Remove 5-7/8" RCD bearing per SOP &
Advisor.
20,189.0 20,189.0
4/22/2023
10:15
4/22/2023
12:30
2.25 PROD1, TRIPCAS TRIP P Trip out of the hole from 20,189' -
18,267' MD.
PU 248K
20,189.0 18,267.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 127/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/22/2023
12:30
4/22/2023
14:00
1.50 PROD1, TRIPCAS CIRC P Open Well Commander per DD. Drop
1.75" steel ball & pump down at 1 bpm,
1175 psi. Ball on seat with 148 bbls
pumped. Shift open with 1933 psi. One
ball in catcher. Circulate at 250 gpm,
670 psi. SIMOPS prep for cut and slip.
18,267.0 18,267.0
4/22/2023
14:00
4/22/2023
15:30
1.50 PROD1, TRIPCAS SLPC P Cut and slip 443' of drilling line. Inspect
brakes, deadman, & perform block
calibration.
Circulate at 190 gpm, 400 psi.
18,267.0 18,267.0
4/22/2023
15:30
4/22/2023
19:30
4.00 PROD1, TRIPCAS CIRC P Circulate at 7-5/8" liner top at 18,267'
MD with Well Commander open. No
cutting returns observed.
500 gpm
2150 psi
FO 25%
80 rpm = Tq 16K
ROT 170K
18,267.0 18,267.0
4/22/2023
19:30
4/22/2023
20:00
0.50 PROD1, TRIPCAS OWFF P Monitor well, static. SIMOPS blow down
top drive & transfer brine to trip tank.
18,267.0 18,267.0
4/22/2023
20:00
4/23/2023
00:00
4.00 PROD1, TRIPCAS TRIP P Trip out of the hole from 18,267' -
14,812' MD.
PU 210K
Obtain torque & drag at 17,165' MD
No pump
30 rpm = Tq 7K
20 fpm
PU 211K
ROT 168K
SO ROT 158K
18,267.0 14,812.0
4/23/2023
00:00
4/23/2023
03:30
3.50 PROD1, TRIPCAS PULD P Trip out of the hole laying down 4-1/2"
drill pipe from 14,812'-12,608' MD.
PU 215K
69 joints laid down
14,812.0 12,608.0
4/23/2023
03:30
4/23/2023
06:00
2.50 PROD1, TRIPCAS CIRC P Circulate at 12,608' MD, reciprocating
with Well Commander at the 9-7/8" liner
top. Observed minimal fines with a 10%-
20% increase in cuttings.
850 gpm = 3615 psi
80 rpm = Tq 9K
Flow out 40%
ROT 159K
Obtain torque & drag at 12,563' MD.
PU 182K
SO 138K
ROT 159K
30 rpm = Tq 5K; BO 10K
12,608.0 12,608.0
4/23/2023
06:00
4/23/2023
07:00
1.00 PROD1, TRIPCAS CIRC P Close Well Commander per DD. Drop
1.75" steel ball. Pump down at 1 bpm,
300 psi. Pump 92.6 bbls to see ball on
seat. Shift close with 1685 psi. Verify
closed with 200 gpm, 980 psi. Well
Commander has 2 balls in the catcher.
Blow down top drive & prep to trip out of
the hole.
12,608.0 12,608.0
4/23/2023
07:00
4/23/2023
14:00
7.00 PROD1, TRIPCAS TRIP P Trip out of the hole racking back 4-1/2"
drill pipe from 12,608'-275' MD. (ST-120
position sensor broken and not
operational. Decision made to rack back
stands versus laying down singles.)
12,608.0 275.0
4/23/2023
14:00
4/23/2023
14:30
0.50 PROD1, TRIPCAS OWFF P Monitor well, static. SIMOPS clear &
clean floor, prep to lay down BHA.
275.0 275.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 128/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/23/2023
14:30
4/23/2023
16:30
2.00 PROD1, TRIPCAS BHAH P Lay down BHA #9 to surface per SLB
DD. Break off bit and hang off 58' of
tools on XY crane to break apart with ST
-100.
Bit Grade: 2-3-CT-A-X-I-BT-TD
275.0 0.0
4/23/2023
16:30
4/23/2023
18:00
1.50 COMPZN, WHDBOP WWWH P Make up wear bushing running tool and
remove wear bushing. Make up stack
wash tool and flush stack, functioning
BOPE as per SOP.
0.0 0.0
4/23/2023
18:00
4/23/2023
21:00
3.00 COMPZN, WHDBOP RURD P Flush & drain BOPE. Make up 5-7/8"
test joint and space out pups. Make up
dart & FOSV, both 4-1/2" & 5-7/8".
SIMOPS MP2 on accumulator system,
change sealing element on pit 1 dump
gate, clean suction & discharge screens
on mud pump #2.
0.0 0.0
4/23/2023
21:00
4/23/2023
23:00
2.00 COMPZN, WHDBOP BHAH P Lay down remaining 58' of BHA #9 with
ST-100 & XY crane per SLB DD.
0.0 0.0
4/23/2023
23:00
4/23/2023
23:30
0.50 COMPZN, WHDBOP SVRG P Service rig & grease upper & lower
IBOP on top drive. SIMOPS finishing
changing out air pump on accumulator
system.
0.0 0.0
4/23/2023
23:30
4/24/2023
00:00
0.50 COMPZN, WHDBOP RURD P Rig up test equipment for BOP test. 0.0 0.0
4/24/2023
00:00
4/24/2023
02:00
2.00 COMPZN, WHDBOP RURD P RIH and set test plug w/ 1 std 5-7/8" DP
under the plug. RU test equip, fluid pack
and shell test
0.0 0.0
4/24/2023
02:00
4/24/2023
10:00
8.00 COMPZN, WHDBOP BOPE P Perform BOPE Tests W/ 4 1/2" & 5 7/8"
test joints, Annular 250 psi F/ 5 min,
2,500 psi F/ 10 min. Remaining Test 250
F/ 5 min, 4,000 F/ 10 min. Upper 4-1/2"
X 7-5/8" VBRS, Lower 3-1/2" x 6-5/8"
VBRS, CMV #1-#16 Manual & HCR
Choke/Kill and Kill Valve #3, Upper and
Lower IBOPS, 4-1/2" and 5-7/8" TIW
and Dart Valves, blind/shears. Charted
all tests. Conduct Koomey drawdown.
36-N2 @ 1000 psi avg, Acc = 3010 psi,
Manifold = 1500 psi, Acc = 1700 psi
after close, 14 sec for 200 psi build w/ 2
electric pumps, full system pressure in
89 sec w/ 2 electric and 6 air pumps.
Closing times: Annular = 22 sec, UPR =
13 sec, Blind/Shears = 14 sec, LPR =
14 sec, Choke HCR = 2 sec, Kill HCR =
2 sec. Test PVT Gain /Loss and Flow
out Alarms. Test LEL and H2S alarms.
AOGCC rep Brian Bixby witnessed test.
BLM rep Quin Sawyer waived witness
4/18/23 0830 Hrs.
0.0 0.0
4/24/2023
10:00
4/24/2023
10:45
0.75 COMPZN, WHDBOP RURD P Pull test plug, LD test joint. Blow down
choke manifold, kill line and mud line.
Drain BOP. Rack back 5-7/8" std DP
0.0 0.0
4/24/2023
10:45
4/24/2023
11:30
0.75 COMPZN, WHDBOP RURD P MU 2 jts of 5" DP w/ wear ring running
tool and set wear ring as per SOP
0.0 0.0
4/24/2023
11:30
4/24/2023
12:00
0.50 COMPZN, WHDBOP RURD P Clean and clear floor, begin mobilizing
equip for liner run
0.0 0.0
4/24/2023
12:00
4/24/2023
13:00
1.00 COMPZN, CASING RURD P Rig up casing equipment, PJSM for
running lower completion
0.0 0.0
4/24/2023
13:00
4/24/2023
18:00
5.00 COMPZN, CASING PUTB P RIH t/ 6500' w/ 12.6 lb, 4-1/2" H563,
P110S liner. MU to 5600 ft/lbs torque,
install 6-1/8" Hydroform centralizers 1/Jt.
Monitor displacement VIA trip tank.
SOW = 115K
0.0 6,500.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 129/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/24/2023
18:00
4/25/2023
00:00
6.00 COMPZN, CASING PUTB P RIH F/6500' T/ 10,410' w/ 12.6 lb, 4-1/2"
H563, P110S liner. 63 total ported jts
and 1 IRSV. MU to 5600 ft/lbs torque,
install 6-1/8" Hydroform centralizers 1/Jt.
Monitor displacement VIA pit #5 once
IRSV picked up to top fill as running and
top off every 15 Jts. SOW = 115K, PUW
= 136K
6,500.0 10,410.0
4/25/2023
00:00
4/25/2023
03:30
3.50 COMPZN, CASING PUTB P RIH F/10,410' T/ 14,176' w/ 12.6 lb, 4-
1/2" H563, P110S liner. 63 total ported
jts and 1 IRSV. MU to 5600 ft/lbs torque,
install 6-1/8" Hydroform centralizers 1/Jt.
Monitor displacement VIA pit #5 once
IRSV picked up to top fill as running and
top off every 15 Jts. SOW = 115K, PUW
= 136K
10,410.0 14,176.0
4/25/2023
03:30
4/25/2023
04:45
1.25 COMPZN, CASING PUTB P PJSM, MU 4.5" handling sub, XO and
PU Drill Quip liner hanger as per Drill
Quip Rep
14,176.0 14,176.0
4/25/2023
04:45
4/25/2023
05:00
0.25 COMPZN, CASING RUNL P MU std 4.5" DP, RIH F/14,176'
T/14,315'. SOW = 119K
14,176.0 14,315.0
4/25/2023
05:00
4/25/2023
06:00
1.00 COMPZN, CASING RUNL P Test integrity of IRSV plug pressuring up
to 500 psi for 5 min down tubing. OK.
Obtain T&D at 14,292'. PUW = 155K,
SOW = 120K, RTW = 129K, 30 RPM,
3K Tq. Blow down TD
14,315.0 14,315.0
4/25/2023
06:00
4/25/2023
10:00
4.00 COMPZN, CASING RUNL P RIH F/14,315' T/19,510' w/ 4.5" DP from
derrick, Monitor displacement on pit #5,
top fill every stand, Obtain T&D at
19,510'. PUW = 197K, SOW = 134K,
RTW = 150K, 5K TQ
14,315.0 19,510.0
4/25/2023
10:00
4/25/2023
11:15
1.25 COMPZN, CASING RUNL P RIH F/19,510' T/19,979' w/ 4.5" HWDP
F/ Shed, Monitor displacement on pit #5,
top fill every joint, Obtain T&D at
19,979'. PUW = 203K, SOW = 138K,
RTW = 154K, 5K TQ
19,510.0 19,979.0
4/25/2023
11:15
4/25/2023
12:00
0.75 COMPZN, CASING RUNL P Swap handling tools T/ 5-7/8", Install PS
-21's, PJSM for drifting pipe out of
derrick
19,979.0 19,979.0
4/25/2023
12:00
4/25/2023
18:00
6.00 COMPZN, CASING RUNL P RIH F/19,979' T/22,820' w/ 5-7/8" DP F/
derrick, drifting each stand to 3.5".
Monitor displacement on TT, top fill
every stand, Obtain T&D at 20,440'.
PUW = 210K, SOW = 144K, RTW =
164K, 5K TQ. Began taking wt in high
DL, required rotation. Continue RIH
rotating 20 RPM.
19,979.0 22,820.0
4/25/2023
18:00
4/25/2023
22:30
4.50 COMPZN, CASING RUNL P RIH F/22,820' T/24,157' w/ 5-7/8" DP F/
derrick, drifting each stand to 3.5".
Monitor displacement on TT, top fill
every stand via pit #5. Continue RIH
rotating 20 RPM, 10K Tq
22,820.0 24,157.0
4/25/2023
22:30
4/25/2023
23:30
1.00 COMPZN, CASING RGRP T Could not break out TD from stump,
broke Lower IBOP to Saver sub
attempting to break-out from stump.
Remove torque rings on quill.
24,157.0 24,157.0
4/25/2023
23:30
4/26/2023
00:00
0.50 COMPZN, CASING SVRG P Service TD 24,157.0 24,157.0
4/26/2023
00:00
4/26/2023
03:30
3.50 COMPZN, CASING RGRP T CO lower IBOP and saver sub, Tq to
74K, max against tongs with TD,
conduct torque test with TD against load
cell to verify proper readings. Finish tie
wire and torque rings to spec. Monitor
well VIA TT. Approximately 1 BPH loss
rate.
24,157.0 24,157.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 130/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/26/2023
03:30
4/26/2023
04:15
0.75 COMPZN, CASING RGRP T Pressure test lower IBOP 250 psi for 5
min, 4000 psi for 10 min, charted. Work
pipe F/ 24,157' T/24,095' OK, 20 RPM,
8K Tq, monitor well VIA TT.
Approximately 1 BPH loss rate.
24,157.0 24,157.0
4/26/2023
04:15
4/26/2023
05:30
1.25 COMPZN, CASING RGRP T Troubleshoot & test TD TQ readings
against rig tongs and ST-120. Appear
consistant.
24,157.0 24,157.0
4/26/2023
05:30
4/26/2023
08:00
2.50 COMPZN, CASING RGRP T Work pipe F/24,157' T/24,095' OK, 20
RPM, 8K Tq. Remove Upper/Lower lock
rings, torque through IBOP/Saver sub to
85K per SOP 3X. MU lock rings and
torque to spec.
24,157.0 24,157.0
4/26/2023
08:00
4/26/2023
08:30
0.50 COMPZN, CASING RUNL P RIH F/24,157' T/24,252' w/ 5-7/8" DP F/
derrick, drifting each stand to 3.5". 20
RPM, 11K Tq, 151K RTW
24,157.0 24,252.0
4/26/2023
08:30
4/26/2023
10:15
1.75 COMPZN, CASING RGRP T Unable to break out of stump.
connection between lower IBOP and
saver sub broke. attempt to break saver
sub out of stump with ST-120. No go.
Appears BU tongs slipped causing
overtorquing not TD calibration
24,252.0 24,252.0
4/26/2023
10:15
4/26/2023
10:45
0.50 COMPZN, CASING RGRP T POOH F/24,252' T/24,220'. PUW =
236K. LD top single of std #107 with
saver sub and lower IBOP attached
24,252.0 24,220.0
4/26/2023
10:45
4/26/2023
11:30
0.75 COMPZN, CASING RGRP T Mobilize new saver sub and lower IBOP,
Install as per SOP, Tq to 85K 3Xs
24,220.0 24,220.0
4/26/2023
11:30
4/26/2023
12:00
0.50 COMPZN, CASING RGRP T Pressure test lower IBOP 250 psi 5 min,
4000 psi 10 min, charted
24,220.0 24,220.0
4/26/2023
12:00
4/26/2023
12:30
0.50 COMPZN, CASING RGRP T RD test equip, install lock rings on lower
IBOP and saver sub per SOP.
24,220.0 24,220.0
4/26/2023
12:30
4/26/2023
13:00
0.50 COMPZN, CASING SVRG P Service/Inspect TD 24,220.0 24,220.0
4/26/2023
13:00
4/26/2023
18:00
5.00 COMPZN, CASING RUNL P RIH F/24,220' T/26,050' w/ 5-7/8" DP F/
derrick, drifting each stand to 3.5". 20
RPM, 8-13K Tq, 156K RTW. Monitor
disp VIA TT, fill every std VIA pit #5
24,220.0 26,050.0
4/26/2023
18:00
4/27/2023
00:00
6.00 COMPZN, CASING RUNL P RIH F/26,050' T/27,696' w/ 5-7/8" DP F/
derrick, drifting each stand to 3.5". 25
RPM, 11-16K Tq, 160K RTW. Monitor
disp VIA TT, fill every std VIA pit #5
26,050.0 27,696.0
4/27/2023
00:00
4/27/2023
06:00
6.00 COMPZN, CASING RUNL P RIH F/27,696' T/29,215' w/ 5-7/8" DP F/
derrick, drifting each stand to 3.5". 25
RPM, 22K Tq, 161K RTW. Monitor disp
VIA TT, fill every std VIA pit #5
27,696.0 29,215.0
4/27/2023
06:00
4/27/2023
12:00
6.00 COMPZN, CASING RUNL P RIH F/29,215' T/31,030' w/ 5-7/8" DP F/
derrick, drifting each stand to 3.5". 20
RPM, 18K Tq, 165K RTW. Monitor disp
VIA TT, fill every std VIA pit #5
29,215.0 31,030.0
4/27/2023
12:00
4/27/2023
18:00
6.00 COMPZN, CASING RUNL P RIH F/31,030' T/32,375' w/ 5-7/8" DP F/
derrick, drifting each stand to 3.5". 30
RPM, 24K Tq, 165K RTW. Monitor disp
VIA TT, fill every std VIA pit #5.
SIMOPS: LD 4.5" DP from derrick with
tugger
31,030.0 32,375.0
4/27/2023
18:00
4/28/2023
00:00
6.00 COMPZN, CASING RUNL P RIH F/32,375' T/33,284' w/ 5-7/8" DP F/
derrick, drifting each stand to 3.5". 30
RPM, 24-27K Tq, 171K RTW. Monitor
disp VIA TT, fill every std VIA pit #5.
SIMOPS: LD 4.5" DP from derrick with
tugger
32,375.0 33,284.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 131/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/28/2023
00:00
4/28/2023
06:00
6.00 COMPZN, CASING RUNL P RIH F/33,284' T/34,350' set depth w/ 5-
7/8" DP F/ derrick, drifting each stand to
3.5". 30 RPM, 28K Tq, 176K RTW.
Monitor disp VIA TT, fill every std VIA pit
#5. SIMOPS: LD 4.5" DP from derrick
with tugger
33,284.0 34,350.0
4/28/2023
06:00
4/28/2023
06:15
0.25 COMPZN, CASING RUNL P Ream to 34,354', 30RPM, 18K Tq, 210K
RTW. PU to obtain benchmark values
prior to setting liner. PU to 333K,
observed loss of string wt to 260K and
free travel at 281K. Rotate 30 rpm, 16K
Tq, 211K RTW. Rotate down to 34,354',
took 17K wt and Tq increased to 21K.
Stop rotation, PU to 280K, 9' of strectch
from 220K to 280K.
34,350.0 34,354.0
4/28/2023
06:15
4/28/2023
11:00
4.75 COMPZN, CASING DHEQ P Attempt to pump down string to set liner
hanger, not holding pressure, increase
to 5500 psi with 33 stks, pop-off opened.
Line up #1 MP, Pressure up again to
5500 psi with 16 more stks. Still
bleeding off. Troubleshoot surface
equip. May have had a partial blockage
on surface. Attempt pressure up again,
1 bpm, observed returns, 70 psi,
pumped 8 bbls with circulation.
34,354.0 34,354.0
4/28/2023
11:00
4/28/2023
12:00
1.00 COMPZN, CASING TRIP P POOH F/34,354' to 34,268'. PUW =
294K, Blow down TD. Monitor hole VIA
TT
34,354.0 34,268.0
4/28/2023
12:00
4/28/2023
13:00
1.00 COMPZN, CASING DHEQ P RU to pressure up wellbore to determine
if liner set. Pressured up to 118 psi and
leaks off. RD test equipment. Monitor
hole VIA TT. Discuss with town.
SIMOPS: LD 4.5" DP from Drk w/ tugger
34,268.0 34,268.0
4/28/2023
13:00
4/28/2023
18:00
5.00 COMPZN, CASING CIRC P PU, CBU @ 34,250'. 350 GPM, 820
PSI, 14800 stks
34,268.0 34,268.0
4/28/2023
18:00
4/28/2023
18:15
0.25 COMPZN, CASING OWFF P Flow check, well U-tubing. MU TD, est
circ
34,268.0 34,268.0
4/28/2023
18:15
4/28/2023
19:00
0.75 COMPZN, CASING CIRC P Circulate to balance, 346 GPM, 814
PSI. Pumped 3200 stks. 12.7+ MW in
and out
34,268.0 34,268.0
4/28/2023
19:00
4/28/2023
20:00
1.00 COMPZN, CASING OWFF P Flow check. Blow down top drive.
Observed slight Utubing. Observe till
stop and static 15 min no flow.
34,268.0 34,268.0
4/28/2023
20:00
4/29/2023
00:00
4.00 COMPZN, CASING TRIP T POOH F/20,090' T/18,108' w/ 5-78" DP,
rack back in Drk. PUW = 280K, monitor
hole fill via TT.
20,090.0 18,108.0
4/29/2023
00:00
4/29/2023
06:00
6.00 COMPZN, CASING TRIP T POOH F/18,108' T/14,480' w/ 5-78" DP,
rack back in Drk. PUW = 235K, monitor
hole fill via TT.
18,108.0 12,480.0
4/29/2023
06:00
4/29/2023
12:00
6.00 COMPZN, CASING TRIP T POOH F/12,480' T/0', 5-7/8" and 4.5"
DP, rack back in Drk. monitor hole fill via
TT.
12,480.0 0.0
4/29/2023
12:00
4/29/2023
13:00
1.00 COMPZN, CASING BHAH T LD Drill Quip running tool. Running tools
was complete except for one missing
dog sub spline. Tool had not seen
setting pressure. Clear and clean floor
0.0 0.0
4/29/2023
13:00
4/29/2023
18:00
5.00 COMPZN, CASING WAIT T Service rig, ST-120, rebuild Koomey
pump #1, clean screens on MP # 1 &2 ,
housekeeping and MP2's. Mobilize
casing equip to RF, welder build mule
shoe, prep floor for packer run while
discuss with town plan forward
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 132/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
4/29/2023
18:00
4/29/2023
19:00
1.00 COMPZN, CASING RURD T Plan is to run Mule shoe Jt, IRSV, blank
Jt liner and DrillQuip liner hanger/packer
assy. Dress mule shoe, check
equipment ok, prep for run
0.0 0.0
4/29/2023
19:00
4/29/2023
21:00
2.00 COMPZN, CASING PUTB T MU liner stacked packer assy to 249' 0.0 249.0
4/29/2023
21:00
4/29/2023
21:30
0.50 COMPZN, CASING DHEQ T Fill string to IRSV with brine, test to 500
psi ok
249.0 249.0
4/29/2023
21:30
4/30/2023
00:00
2.50 COMPZN, CASING RUNL T RIH F/249' T/2,762' with stacker packer
on 4.5" DP from derrick. Monitor
displacement on TT, fill pipe every std,
top off every 10 stds
249.0 2,762.0
4/30/2023
00:00
4/30/2023
06:00
6.00 COMPZN, CASING RUNL T RIH F/2,762' T/8,600' with stacker
packer on 4.5"/5-7/8" DP from derrick.
Monitor displacement on TT, fill pipe
every std, top off every 10 stds
2,762.0 8,600.0
4/30/2023
06:00
4/30/2023
13:00
7.00 COMPZN, CASING RUNL T RIH F/8,600' T/20,106' with stacker
packer on 5-7/8" DP from derrick.
Monitor displacement on TT, fill pipe
every std, top off every 10 stds
8,600.0 20,106.0
4/30/2023
13:00
4/30/2023
14:30
1.50 COMPZN, CASING RUNL T Fill pipe, obtain T&D. PUW=270K,
SOW=148K, Rot Wt=270K, TQ=13K
RIH F/20,106' T/20,174'. Tag no go, set
down 10K to verify
20,106.0 20,174.0
4/30/2023
14:30
4/30/2023
15:30
1.00 COMPZN, CASING RUNL T Set Hgr/Pkr per DrilQuip rep. Pressure
up to 500 psi, 77 stks, hold 5 min,
pressure up to 3631 psi, shear ring, hold
2 min, pressure up to 5000 psi, hold for
10 min, 123 stks total. Bleed down to
500 psi, PU t/ 275K, bleed to 0 psi, PU
to 330K, 60K over pull indicating Hgr
set. SO to 120K.
20,174.0 20,174.0
4/30/2023
15:30
4/30/2023
16:00
0.50 COMPZN, CASING DHEQ T Test annulus to 2500 psi for 15 min
charted. 86 stks total. 11 bbls bled back.
20,174.0 20,174.0
4/30/2023
16:00
4/30/2023
16:30
0.50 COMPZN, CASING TRIP P PU, released from liner, F/ 20,058'
T/19,957'
20,068.0 19,937.0
4/30/2023
16:30
4/30/2023
17:00
0.50 COMPZN, CASING MPDA P Install MPD element/bearing per SOP 19,937.0 19,937.0
4/30/2023
17:00
4/30/2023
18:00
1.00 COMPZN, CASING DISP P Circulate 600 GPM, 2582 PSI, Reducing
MW to 10.8 ppg w/ H2O, holding 12.6
ppg EMW w/ MPD. SIMOPS: LD 4.5"
DP from Drk.
19,937.0 19,937.0
4/30/2023
18:00
4/30/2023
20:45
2.75 COMPZN, CASING DISP P Circulate 600 GPM, 1986 PSI, Reducing
MW to 10.8 ppg with H2O, holding 12.6
ppg EMW w/ MPD. SIMOPS: LD 4.5"
DP from Drk.
19,937.0 19,937.0
4/30/2023
20:45
4/30/2023
21:30
0.75 COMPZN, CASING OWFF P Shut down pumps, trap 600 psi, bleed to
12.0 ppg EMW monitor, bleed off
stepping down in .25 ppg stages to 0
PSI ok. Shut in choke no pressure build,
open to TT and monitor. Total fluid bled
off = 5.2 bbls
19,937.0 19,937.0
4/30/2023
21:30
4/30/2023
22:15
0.75 COMPZN, CASING OWFF P Line up to flow check in cellar. Observe
well static 30 min.
19,937.0 19,937.0
4/30/2023
22:15
4/30/2023
22:30
0.25 COMPZN, CASING TRIP P POOH F/19937 T/19,906'. Rack back
std #214. Observe well U-tubing.
19,937.0 19,906.0
4/30/2023
22:30
4/30/2023
23:30
1.00 COMPZN, CASING RURD P MU TD, circ w/ prep for slip and cut drill
line. 200 gpm, 258 psi
19,906.0 19,906.0
4/30/2023
23:30
5/1/2023
00:00
0.50 COMPZN, CASING SLPC P PJSM, Remove drawworks covers, Slip
and Cut drill line per SOP. SIMOPS: Circ
slowly to balance MW. 200 gpm, 257 psi
19,906.0 19,906.0
5/1/2023
00:00
5/1/2023
02:45
2.75 COMPZN, CASING SLPC P Hang blocks, cut 75' drill line, un-hang
blocks, full block calibration
19,906.0 19,906.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 133/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
5/1/2023
02:45
5/1/2023
03:00
0.25 COMPZN, CASING RURD P Blow down TD, clear floor 19,906.0 19,906.0
5/1/2023
03:00
5/1/2023
04:00
1.00 COMPZN, CASING MPDA P PJSM, pull 5-7/8" RCD bearing/element
per SOP, pressure wash bearing
19,906.0 19,906.0
5/1/2023
04:00
5/1/2023
04:30
0.50 COMPZN, CASING RURD P Prep floor to LD DP 19,906.0 19,906.0
5/1/2023
04:30
5/1/2023
07:30
3.00 COMPZN, CASING PULD P POOH F/19,906' T/17,724'. Laying down
5-7/8" DP to shed, PUW=279K. Monitor
hole fill on TT.
19,906.0 17,724.0
5/1/2023
07:30
5/1/2023
07:45
0.25 COMPZN, CASING CIRC P Pump 30 bbl 12.6 ppg slug, chase with
10 bbl 10.8 ppg, blow down TD
17,724.0 17,724.0
5/1/2023
07:45
5/1/2023
12:00
4.25 COMPZN, CASING PULD P POOH F/17,724' T/13,169'. Laying down
5-7/8" DP to shed, PUW=255K. Monitor
hole fill on TT.
17,724.0 13,169.0
5/1/2023
12:00
5/1/2023
17:45
5.75 COMPZN, CASING PULD P POOH F/13,169' T/5,800'. Laying down
5-7/8" DP to shed, PUW=125K. Monitor
hole fill on TT.
13,169.0 5,800.0
5/1/2023
17:45
5/1/2023
18:15
0.50 COMPZN, CASING RURD P Swap handling tools to 4.5" 5,800.0 5,800.0
5/1/2023
18:15
5/1/2023
23:15
5.00 COMPZN, CASING PULD P POOH F/5,800' T/80'. Laying down 4-
1/2" DP to shed. Monitor hole fill on TT.
5,800.0 80.0
5/1/2023
23:15
5/2/2023
00:00
0.75 COMPZN, CASING PULD P PJSM for laying down running tool. LD
last Jt DP
80.0 50.0
5/2/2023
00:00
5/2/2023
02:00
2.00 COMPZN, CASING BHAH P LD DrilQuip Stacker Packer running
tool. Clear and clean floor
50.0 0.0
5/2/2023
02:00
5/2/2023
03:30
1.50 COMPZN, RPCOMP RURD P Mobilize Cameron wellhead equipment
to floor. Pull wear ring. SIMOPS: Crane
pick liner hanger skate off rig
0.0 0.0
5/2/2023
03:30
5/2/2023
05:00
1.50 COMPZN, RPCOMP WWWH P MU Cameron jetting tool, 2 Jts 5" DP.
Jet hanger profile as per Cameron Rep.
700 gpm, 70 psi, 1 rpm. 2200 stks total.
Install spring loaded VR plug and test
5K 15 min.
0.0 0.0
5/2/2023
05:00
5/2/2023
06:00
1.00 COMPZN, RPCOMP RURD P LD Cameron jet tool. B/D top drive, MU
Cameron 9-7/8" dummy hanger as per
Cameron rep
0.0 0.0
5/2/2023
06:00
5/2/2023
07:00
1.00 COMPZN, RPCOMP RURD P Set dummy hanger as per Cameron
Rep, to 5K, test VR plug to 5K. LD 2 Jts
5" DP and hanger running tool
0.0 0.0
5/2/2023
07:00
5/2/2023
11:00
4.00 COMPZN, RPCOMP RURD P PJSM, mobilize Silverwell tools,
spooling unit, clamps and casing
equipment to rig floor. Hang sheave in
derrick w/ secondary restraint
0.0 0.0
5/2/2023
11:00
5/2/2023
12:00
1.00 COMPZN, RPCOMP PUTB P PJSM, MU Baker locator assy w/ self
orienting shoe and 1 Jt tbg
0.0 69.0
5/2/2023
12:00
5/2/2023
14:15
2.25 COMPZN, RPCOMP PUTB P RIH F/69' T/2,171' w/ 4.5" 12.6# L80
H563 Tubing upper completion per
detail. Torque Turn to 3,800 ft/lbs.
Monitor displacement on TT.
69.0 2,171.0
5/2/2023
14:15
5/2/2023
17:00
2.75 COMPZN, RPCOMP PUTB P MU Silverwell lower Dial GLM w/ DHG.
MU top cable head connection. PT to 6K
for 15 min
2,171.0 2,171.0
5/2/2023
17:00
5/2/2023
18:00
1.00 COMPZN, RPCOMP PUTB P RIH F/2,171' T/ 2500' w/ 4.5" 12.6# L80
H563 Tubing upper completion per
detail. Torque Turn to 3,800 ft/lbs. Install
4.5" x 7.24" PolyOil clamps 1/Jt over Tec
wire. Monitor displacement on TT.
2,171.0 2,500.0
5/2/2023
18:00
5/2/2023
22:15
4.25 COMPZN, RPCOMP PUTB P RIH F/2500' T/4,605'w/ 4.5" 12.6# L80
H563 Tubing upper completion per
detail. Torque Turn to 3,800 ft/lbs. Install
4.5" x 7.24" PolyOil clamps 1/Jt over Tec
wire. Monitor displacement on TT.
2,500.0 4,605.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 134/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
5/2/2023
22:15
5/2/2023
22:45
0.50 COMPZN, RPCOMP DHEQ P Test Silverwell GLM Dial. Valves 2-5
functioned. 1 and 6 would not open
4,605.0 4,605.0
5/2/2023
22:45
5/2/2023
23:30
0.75 COMPZN, RPCOMP PUTB T POOH F/4,605' T/4,166'. To reduce
HPSI across valves. PUW = 114K.
Monitor hole fill on TT
4,605.0 4,166.0
5/2/2023
23:30
5/2/2023
23:45
0.25 COMPZN, RPCOMP DHEQ T Test Silverwell GLM Dial. Valves 1-5
functioned. 6 would not open
4,166.0 4,166.0
5/2/2023
23:45
5/3/2023
00:00
0.25 COMPZN, RPCOMP PUTB T POOH F/4,166' T/4,110'. To reduce
HPSI across valves. PUW = 114K.
Monitor hole fill on TT
4,166.0 4,110.0
5/3/2023
00:00
5/3/2023
00:45
0.75 COMPZN, RPCOMP PUTB T POOH F/4,166' T/4,110'. To reduce
HPSI across valves. PUW = 114K.
Monitor hole fill on TT
4,110.0 3,841.0
5/3/2023
00:45
5/3/2023
01:00
0.25 COMPZN, RPCOMP DHEQ T Test Silverwell lower Dial GLM w/ 990
psi hydrostatic. All funtioned properly. All
tests good.
3,841.0 3,841.0
5/3/2023
01:00
5/3/2023
02:00
1.00 COMPZN, RPCOMP PUTB T RIH F/3,841' T/4,605'w/ 4.5" 12.6# L80
H563 Tubing upper completion per
detail. Torque Turn to 3,800 ft/lbs. Install
4.5" x 7.24" PolyOil clamps 1/Jt over Tec
wire. Monitor displacement on TT.
3,841.0 4,605.0
5/3/2023
02:00
5/3/2023
11:00
9.00 COMPZN, RPCOMP PUTB P RIH F/4,605' T/9,556'w/ 4.5" 12.6# L80
H563 Tubing upper completion per
detail. Torque Turn to 3,800 ft/lbs. Install
4.5" x 7.24" PolyOil clamps 1/Jt over Tec
wire through Jt #187, 140 total. Begin
install 4.5" x 11.75" on Jt #188. 1/Jt.
Monitor displacement on TT.
4,605.0 9,556.0
5/3/2023
11:00
5/3/2023
12:00
1.00 COMPZN, RPCOMP FISH T While running Jt #228, one of the
Cavins air slip dies came free from body
and fell in hole with retaining pin. Shut
down, notify Co Rep. Drain stack,
remove bushings, look for die and pin.
Unable to locate slip die. Pin visible.
9,556.0 9,556.0
5/3/2023
12:00
5/3/2023
18:00
6.00 COMPZN, RPCOMP FISH T Discuss with town. Prep T-bar w/
magnet. Hoist string to place centralizer
at top of wellhead. SIMOPS: Clean/clear
floor, replace wood bearing on auger in
pits,
9,556.0 9,556.0
5/3/2023
18:00
5/3/2023
22:15
4.25 COMPZN, RPCOMP FISH T Retrieve keeper pin using T-bar w/
magnet. Lost magnet, Retrieve magnet
with T-bar.
9,556.0 9,556.0
5/3/2023
22:15
5/3/2023
22:45
0.50 COMPZN, RPCOMP FISH T LD T-bar, Clear floor of excess retrieval
equipment, inspect all tubing
equipment.. Fill stack with 22 bbls. Prep
to run tubing
9,556.0 9,556.0
5/3/2023
22:45
5/4/2023
00:00
1.25 COMPZN, RPCOMP PUTB P RIH F/9,556' T/10,086 'w/ 4.5" 12.6#
L80 H563 Tubing upper completion per
detail. Torque Turn to 3,800 ft/lbs. Install
4.5" x 11.75" PolyOil clamps over Tec
wire. 1/Jt. Monitor displacement on TT.
9,556.0 10,086.0
5/4/2023
00:00
5/4/2023
01:00
1.00 COMPZN, RPCOMP PUTB P RIH F/10,086' T/10,672' w/ 4.5" 12.6#
L80 H563 Tubing upper completion per
detail. SOW=123K, Torque Turn to
3,800 ft/lbs. Install 4.5" x 11.75" PolyOil
clamps over Tec wire. 1/Jt. Monitor
displacement on TT.
10,086.0 10,672.0
5/4/2023
01:00
5/4/2023
02:15
1.25 COMPZN, RPCOMP DHEQ P Function test Silverwell lower GLM dial.
Oriface #6 not opening fully, all other ok.
Decision made to RIH.
10,672.0 10,672.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 135/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
5/4/2023
02:15
5/4/2023
09:30
7.25 COMPZN, RPCOMP PUTB P RIH F/10,672' T/14,469' w/ 4.5" 12.6#
L80 H563 Tubing upper completion per
detail. SOW=124K, Torque Turn to
3,800 ft/lbs. Install 4.5" x 11.75" PolyOil
clamps over Tec wire. 1/Jt. Monitor
displacement on TT.
10,672.0 14,469.0
5/4/2023
09:30
5/4/2023
10:00
0.50 COMPZN, RPCOMP PUTB P MU upper Silverwell GLM dial assy. 14,469.0 14,469.0
5/4/2023
10:00
5/4/2023
18:00
8.00 COMPZN, RPCOMP PUTB P Silverwell crew MU lower cable head
assy to Tec wire, PT to 6K 15min,
charted. MU upper cable head assy to
Tec wire, feed through Dial and MU top
connection port. PT to 6K 15 min,
charted.
14,469.0 14,469.0
5/4/2023
18:00
5/4/2023
19:15
1.25 COMPZN, RPCOMP PUTB P RIH F/14,469' T/15,019' w/ 4.5" 12.6#
L80 H563 Tubing upper completion per
detail. SOW=124K, Torque Turn to
3,800 ft/lbs. Install 4.5" x 11.75" PolyOil
clamps over Tec wire. 1/Jt. Monitor
displacement on TT.
14,469.0 15,019.0
5/4/2023
19:15
5/4/2023
20:00
0.75 COMPZN, RPCOMP RURD P Swap handling tools to 5", MU 4.5 x 5"
XO.
15,019.0 15,019.0
5/4/2023
20:00
5/5/2023
00:00
4.00 COMPZN, RPCOMP PUTB P RIH F/15,019' T/16,335' w/ 5" 24.1# L80
H563 Tubing upper completion per
detail. PUW=170K, SOW=137K, Torque
Turn to 18,000 ft/lbs. Install 5" x 11.75"
PolyOil clamps over Tec wire. 1/Jt.
Monitor displacement on TT.
15,019.0 16,335.0
5/5/2023
00:00
5/5/2023
01:15
1.25 COMPZN, RPCOMP PUTB P RIH F/16,335' T/16,625' w/ 5" 24.1# L80
H563 Tubing upper completion per
detail. PUW=175K, SOW=139K, Torque
Turn to 18,000 ft/lbs. Install 5" x 11.75"
PolyOil clamps over Tec wire. 1/Jt.
Monitor displacement on TT.
16,335.0 16,625.0
5/5/2023
01:15
5/5/2023
02:45
1.50 COMPZN, RPCOMP CIRC P Observed excess fluid coming over top
of tubing, stabbed safety valve, flow
check confirmed U-tubing/wel dead. MU
TD and pump 30 bbl, 12.7 dry job. 100
gpm, 132 psi. Blow down TD
16,625.0 16,625.0
5/5/2023
02:45
5/5/2023
06:00
3.25 COMPZN, RPCOMP PUTB P RIH F/16,625' T/17,941' w/ 5" 24.1# L80
H563 Tubing upper completion per
detail. PUW=175K, SOW=142K, Torque
Turn to 18,000 ft/lbs. Install 5" x 11.75"
PolyOil clamps over Tec wire. 1/Jt.
Monitor displacement on TT.
16,625.0 17,941.0
5/5/2023
06:00
5/5/2023
10:00
4.00 COMPZN, RPCOMP PUTB P RIH F/17,941' T/20,029' w/ 5" 24.1# L80
H563 Tubing upper completion per
detail. PUW=209K, SOW=164K, Torque
Turn to 18,000 ft/lbs. Install 5" x 11.75"
PolyOil clamps over Tec wire. 1/Jt.
Monitor displacement on TT.
17,941.0 17,941.0
5/5/2023
10:00
5/5/2023
12:00
2.00 COMPZN, RPCOMP RURD P RU 8' bail extensions, RU H563 X 5-7/8"
FOSV and head pin. MU cement hose
to head pin
17,941.0 17,941.0
5/5/2023
12:00
5/5/2023
12:30
0.50 COMPZN, RPCOMP CIRC P Wash down at 1bpm. SOW=164K,
PUW=209K. Set down 10K to verify, 160
psi increase in pump pressure, tagged
9' in on Jt #481
17,941.0 20,042.0
5/5/2023
12:30
5/5/2023
13:00
0.50 COMPZN, RPCOMP RURD P RD cement hose, head pin and floor
valve
20,042.0 20,042.0
5/5/2023
13:00
5/5/2023
14:00
1.00 COMPZN, RPCOMP THGR P LD Jts 481, 480, 479 and 478. PUW =
209K
20,042.0 19,908.0
5/5/2023
14:00
5/5/2023
15:00
1.00 COMPZN, RPCOMP THGR P MU Pups 3.93', 7.93', 9.83', 14.57' and
Jt #478
19,908.0 19,980.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 136/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
5/5/2023
15:00
5/5/2023
15:30
0.50 COMPZN, RPCOMP THGR P MU Cameron hanger and landing Jt 19,980.0 19,980.0
5/5/2023
15:30
5/5/2023
16:30
1.00 COMPZN, RPCOMP THGR P Clean and clear floor, lower Tec line
sheave, Silverwell prep Tec wire, strip
70' of Tec wire, feed through and
terminate through hanger
19,980.0 19,980.0
5/5/2023
16:30
5/5/2023
17:00
0.50 COMPZN, RPCOMP THGR P Test control line fittings through hanger,
5000 psi good.
19,980.0 19,980.0
5/5/2023
17:00
5/5/2023
18:00
1.00 COMPZN, RPCOMP THGR P RIH with hanger on landing Jt. Took wt
on MPD clamp
19,980.0 20,005.0
5/5/2023
18:00
5/5/2023
21:00
3.00 COMPZN, RPCOMP THGR P POOH, observed scar on hanger,
damaged seals. LD Hanger and
Cameron redress. Reconfigure space
out pups, LD 3.93' pup
20,005.0 20,005.0
5/5/2023
21:00
5/5/2023
22:00
1.00 COMPZN, RPCOMP THGR P MU space out pups, #478, Cameron
hanger, feed Tec wire through hanger.
20,005.0 20,005.0
5/5/2023
22:00
5/5/2023
22:30
0.50 COMPZN, RPCOMP THGR P Test Tec wire fittings to 5000 psi ok. 20,005.0 20,005.0
5/5/2023
22:30
5/6/2023
00:00
1.50 COMPZN, RPCOMP THGR P RIH w/ Cameron hanger, land out
hanger, verify hanger on depth, turn
landing Jt 4 turns out to release snap
ring. Pull test to 259K hookload ok.
20,005.0 20,039.0
5/6/2023
00:00
5/6/2023
01:30
1.50 COMPZN, RPCOMP THGR P RU to pump down tubing and RU return
line from IA. SIMOPS: Cameron rep
pressure test tubing hanger seals to
5000 psi for 15 minutes each, T-seal
and mechanical seals.
20,039.0 20,039.0
5/6/2023
01:30
5/6/2023
01:45
0.25 COMPZN, WHDBOP PACK P PJSM, fluid pack and PT surface lines to
5000 psi
20,039.0 20,039.0
5/6/2023
01:45
5/6/2023
03:00
1.25 COMPZN, WHDBOP PACK P Set Baker packer per Baker rep. Stage
up pressure 500 psi per stage. Annulus
pressure following +100 psi. At 1470 psi
Tbg pressure, 1570 IA pressure, notice
tbg pressure start increasing faster than
IA w/ pump 1 more stroke. Shutdown
pump, hold 1583 psi, 15 min. (Lower
DHG=5525 psi) Bleed off IA, confirm
packer set.
20,039.0 20,039.0
5/6/2023
03:00
5/6/2023
03:30
0.50 COMPZN, WHDBOP PRTS P PT Tbg and packer from below to 4000
psi for 15 min, charted
20,039.0 20,039.0
5/6/2023
03:30
5/6/2023
04:00
0.50 COMPZN, WHDBOP Bleed off Tbg, pressure up IA to1156 psi
to shear SOV,
20,039.0 20,039.0
5/6/2023
04:00
5/6/2023
05:00
1.00 COMPZN, WHDBOP RURD P RD head pin and circ gear, back out
landing Jt and LD. SIMOPS: RD casing
equip and Silverwell equip.
20,039.0 20,039.0
5/6/2023
05:00
5/6/2023
06:00
1.00 COMPZN, WHDBOP RURD P Set HP-BPV with T-bar per Cameron
Rep
0.0 0.0
5/6/2023
06:00
5/6/2023
07:00
1.00 COMPZN, WHDBOP DHEQ P Line up to Inj line/MP #4. Pump down IA
to test HP-BPV from below to 1500 psi
for 15 min.Charted. Bleed off, blow
down. Cont clear and clean floor.
0.0 0.0
5/6/2023
07:00
5/6/2023
09:30
2.50 COMPZN, WHDBOP RURD P LD mousehole, foxhole #1 and #2. Prep
MPD equip for RD, Silverwell conduct
test on Tec wire. Remove low pressure
riser. SIMOPS: Offload pit#5, clean pits,
flush all pumps and surface lines w/
DeepKleen pill
0.0 0.0
5/6/2023
09:30
5/6/2023
12:00
2.50 COMPZN, WHDBOP NUND P RD MPD lines and HP iron. Cont
cleaning pits and surface lines. Clear
floor of Silverwell equip and tools. prep
to hoist RCD clamp assy, power down
Koomey unit
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 137/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
5/6/2023
12:00
5/6/2023
16:00
4.00 COMPZN, WHDBOP NUND P Remove RCD clamp assy and secure
on cart in BOP deck, remove choke and
kill lines, Rack back BOP's on transport
stand and secure for move, remove HP
riser from wellhead and secure on cart
in BOP deck, clean sumps in pit and
pump mods.
0.0 0.0
5/6/2023
16:00
5/6/2023
18:00
2.00 COMPZN, WHDBOP NUND P Cameron reps prep wellhead for tree
adapter, Silverwell begin terminating Tec
wire. Clean ST-120 and prep for
mechanic, clean and drain liner wash
sumps on MP's.Flush CPU with
Deepclean and offload.
0.0 0.0
5/6/2023
18:00
5/6/2023
22:00
4.00 COMPZN, WHDBOP NUND P Silverwell installing wellhead outlet, test.
SIMOPS. Flush and blow down all 4
mud pumps and pump lines, cont
cleaning in pits, mobilize tree to BOP
deck, make breaks on tree to orient per
drawing.
0.0 0.0
5/6/2023
22:00
5/7/2023
00:00
2.00 COMPZN, WHDBOP NUND T Cameron attempt to install support ring
for ICanh seals. Trouble getting
threaded in. SIMOPS: Cont flushing and
blowing down mix/charge pumps, pit
lines, clean drip pan and rotary table
area, mobilize rig mats off location for
rig move. Move cuttings tanks for mat
access.
0.0 0.0
5/7/2023
00:00
5/7/2023
03:30
3.50 COMPZN, WHDBOP NUND P Install support ring per Cameron rep.
SIMOPS: Cont flushing and blowing
down mix/charge pumps, pit lines, clean
drip pan and rotary table area. Mobilize
rig mats off location for rig move.
0.0 0.0
5/7/2023
03:30
5/7/2023
05:15
1.75 COMPZN, WHDBOP NUND P Install wellhead studs for Tbg head
adapter. Install tubing head adapter and
torque per Cameron rep. SIMOPS: Cont
flushing and clean in pits, clean drip pan
area and rig floor
0.0 0.0
5/7/2023
05:15
5/7/2023
06:00
0.75 COMPZN, WHDBOP PRTS P Test tubing head adapter through upper
port 250 psi low 5000 psi high for 15
min. Pressure test tubing head adapter
through lower port, 250 psi low and
5000 psi for 15 min. Co man witness.
0.0 0.0
5/7/2023
06:00
5/7/2023
10:15
4.25 COMPZN, WHDBOP NUND P NU tree to adapter per Cameron rep.
orient tree and actuator valve per
drawing. Pad operator verify correct
orientation. Torque all studs to spec.
SIMOPS: Prep CD4 location for move
0.0 0.0
5/7/2023
10:15
5/7/2023
12:00
1.75 COMPZN, WHDBOP PRTS P Fill tree with diesel and pressure test,
250 psi low and 5000 psi high for 15
min, charted.
0.0 0.0
5/7/2023
12:00
5/7/2023
12:45
0.75 COMPZN, WHDBOP RURD P Pull HP-BPV per Cameron rep 0.0 0.0
5/7/2023
12:45
5/7/2023
14:00
1.25 COMPZN, WHDBOP FRZP P RU to pump freeze protection w/ LRS.
PT lines to 2000 psi. PJSM w/ crew
0.0 0.0
5/7/2023
14:00
5/7/2023
17:00
3.00 COMPZN, WHDBOP FRZP P LRS pump diesel freeze protect down IA
taking returns up tubing to CPU. 191
bbls pumped, 1.25 bpm. 644 psi max
pressure.
Swap to generator power and off gas at
1500 Hrs.
0.0 0.0
5/7/2023
17:00
5/7/2023
18:30
1.50 COMPZN, WHDBOP FRZP P RD, LRS. IA = 262 psi. Line up and U-
tube to balance freeze protect to 1400'
MD /1391' TVD.
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 138/138
CD2-361
Report Printed: 5/23/2023
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
5/7/2023
18:30
5/7/2023
20:00
1.50 COMPZN, WHDBOP FRZP P Blow down all lines and freeze protect
equipment. RD same.
0.0 0.0
5/7/2023
20:00
5/7/2023
21:00
1.00 COMPZN, WHDBOP RURD P Remove double annulus valves, install
flanges and valve/gauge assy's on OA,
IA and TBG. Check final pressures. OA=
10 psi, IA = 20 psi, TBG = 0 psi.
Secure well, all valves closed. SIMOPS:
Prep for skidding drill mod. unhook all
power cables to mods and drill floor.
clean and stow tools from cellar, begin
blow down water system.
0.0 0.0
5/7/2023
21:00
5/8/2023
00:00
3.00 DEMOB, MOVE RURD P Clean wellhead/tree and cellar. Cont
prep for skidding drill mod. Clean and
stow tools from cellar, blow down water
system and steam system. Release Rig
5/8/23 0000 hrs
0.0 0.0
Rig: DOYON 26
RIG RELEASE DATE 5/8/2023
Page 1/1
CD2-361
Report Printed: 6/1/2023
Cement
Cement Details
Description
Surface String Cement
Cementing Start Date
12/13/2022 18:00
Cementing End Date
12/14/2022 22:00
Wellbore Name
CD2-361
Comment
Cement Stages
Stage # 1
Description
20" Casing Cement
Objective Top Depth (ftKB)
56.1
Bottom Depth (ftKB)
2,478.5
Full Return?
Yes
Vol Cement …
265.0
Top Plug?
No
Btm Plug?
No
Q Pump Init (bbl/m…
11
Q Pump Final (bbl/…
11
Q Pump Avg (bbl/…
700
P Pump Final (psi)
810.0
P Plug Bump (psi)
1,420.0
Recip?
No
Stroke (ft) Rotated?
No
Pipe RPM (rpm)
Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in)
Comment
BREAK CIRCULATION @ 2 BPM, VERIFY FLOW PATH AND ENSURE DEBRIS CUP IS IN PLACE. STAGE PUMPS UP TO 12 BPM, PSI=490, F/O=28%,
CONTINUE CLEARING CASING EQUIPMENT FROM RIG FLOOR. RIG UP INJECTION LINE TO 4" VALVE IN CELLAR BOX FOR BLACK WATER
FLUSH/CEMENT CLEAN UP.
RIG PUMPS DISPLACE 68 BBLS OF 10.0 PPG DRIL PLEX MUD AT 420 GPM W/ 560 PSI. LATCH DART AND PRESSURE UP TO 1420 PSI, BLEED OFF, &
CHECK FLOATS. FLOATS HOLDING.
Cement Fluids & Additives
Fluid
Fluid Type
Lead Cement
Fluid Description Estimated Top (ftKB)
56.1
Est Btm (ftKB)
1,500.0
Amount (sacks)
1,757
Class
G
Volume Pumped (bbl)
645.0
Yield (ft³/sack)
1.92
Mix H20 Ratio (gal/sack)
6.70
Free Water (%) Density (lb/gal)
11.00
Plastic Viscosity (cP)
198.0
Thickening Time (hr)
5.47
CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Fluid
Fluid Type
Tail Cement
Fluid Description Estimated Top (ftKB)
1,500.0
Est Btm (ftKB)
2,478.5
Amount (sacks)
684
Class
G
Volume Pumped (bbl)
155.0
Yield (ft³/sack)
1.17
Mix H20 Ratio (gal/sack)
4.80
Free Water (%) Density (lb/gal)
15.80
Plastic Viscosity (cP)
87.0
Thickening Time (hr)
5.32
CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Surface String Cement
Page 1/1
CD2-361
Report Printed: 6/1/2023
Cement
Cement Details
Description
Intermediate String 1 Cement
Cementing Start Date
12/31/2022 21:30
Cementing End Date
1/1/2023 04:30
Wellbore Name
CD2-361
Comment
Cement Stages
Stage # 1
Description
Intermediate String 1
Cement
Objective Top Depth (ftKB)
2,319.3
Bottom Depth (ftKB)
6,404.0
Full Return?
Yes
Vol Cement …Top Plug?
Yes
Btm Plug?
Yes
Q Pump Init (bbl/m…
5
Q Pump Final (bbl/…
3
Q Pump Avg (bbl/…
12
P Pump Final (psi)
600.0
P Plug Bump (psi)
600.0
Recip?
No
Stroke (ft) Rotated?
No
Pipe RPM (rpm)
Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in)
Comment
Cement Fluids & Additives
Fluid
Fluid Type
Lead Cement
Fluid Description Estimated Top (ftKB)
2,319.3
Est Btm (ftKB)
5,900.0
Amount (sacks)
1,123
Class
*NOT IN LIBRARY
Volume Pumped (bbl)
382.0
Yield (ft³/sack)
1.91
Mix H20 Ratio (gal/sack)
6.66
Free Water (%) Density (lb/gal)
11.00
Plastic Viscosity (cP)
326.0
Thickening Time (hr)
8.00
CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Fluid
Fluid Type
Tail Cement
Fluid Description Estimated Top (ftKB)
5,900.0
Est Btm (ftKB)
6,404.0
Amount (sacks)
474
Class
*NOT IN LIBRARY
Volume Pumped (bbl)
98.0
Yield (ft³/sack)
1.16
Mix H20 Ratio (gal/sack)
4.77
Free Water (%) Density (lb/gal)
15.80
Plastic Viscosity (cP)
180.0
Thickening Time (hr)
5.50
CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Intermediate String 1 Cement
Page 1/1
CD2-361
Report Printed: 6/1/2023
Cement
Cement Details
Description
Intermediate String 2 Cement
Cementing Start Date
1/15/2023 02:00
Cementing End Date
1/15/2023 07:30
Wellbore Name
CD2-361
Comment
Cement Stages
Stage # 1
Description
Intermediate String 2
Cement
Objective Top Depth (ftKB)
11,406.0
Bottom Depth (ftKB)
12,599.0
Full Return?
Yes
Vol Cement …
0.0
Top Plug?
Yes
Btm Plug?
Yes
Q Pump Init (bbl/m…
12
Q Pump Final (bbl/…
3
Q Pump Avg (bbl/…
10
P Pump Final (psi)
900.0
P Plug Bump (psi)
1,400.0
Recip?
No
Stroke (ft) Rotated?
No
Pipe RPM (rpm)
Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in)
Comment
Cement Fluids & Additives
Fluid
Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl)
Yield (ft³/sack) Mix H20 Ratio (gal/sack) Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Intermediate String 2 Cement
Page 1/1
CD2-361
Report Printed: 6/1/2023
Cement
Cement Details
Description
Intermediate String 3 Cement
Cementing Start Date
2/6/2023 13:45
Cementing End Date
2/6/2023 16:15
Wellbore Name
CD2-361
Comment
Cement Stages
Stage # 1
Description
Intermediate String 3
Cement
Objective Top Depth (ftKB)
17,260.0
Bottom Depth (ftKB)
18,468.0
Full Return?
Yes
Vol Cement …Top Plug?
No
Btm Plug?
No
Q Pump Init (bbl/m…
6
Q Pump Final (bbl/…
6
Q Pump Avg (bbl/…
6
P Pump Final (psi)
600.0
P Plug Bump (psi) Recip?
No
Stroke (ft) Rotated?
No
Pipe RPM (rpm)
Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in)
Comment
Cement Fluids & Additives
Fluid
Fluid Type
Tail Cement
Fluid Description Estimated Top (ftKB)
17,260.0
Est Btm (ftKB)
18,468.0
Amount (sacks)
705
Class
G
Volume Pumped (bbl)
147.0
Yield (ft³/sack)
1.17
Mix H20 Ratio (gal/sack)
4.71
Free Water (%) Density (lb/gal)
15.80
Plastic Viscosity (cP) Thickening Time (hr)
9.00
CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Intermediate String 3 Cement
Page 1/1
CD2-361
Report Printed: 6/1/2023
Cement
Cement Details
Description
Intermediate String 4 Cement
Cementing Start Date
2/21/2023 18:00
Cementing End Date
2/22/2023 02:00
Wellbore Name
CD2-361
Comment
no returns during cement job, bump plug on time, test casing 3500 psi good test
Cement Stages
Stage # 1
Description
Liner Cement
Objective Top Depth (ftKB)
18,790.0
Bottom Depth (ftKB)
20,445.0
Full Return?
No
Vol Cement …
0.0
Top Plug?
Yes
Btm Plug?
Yes
Q Pump Init (bbl/m… Q Pump Final (bbl/… Q Pump Avg (bbl/…P Pump Final (psi) P Plug Bump (psi) Recip?
No
Stroke (ft) Rotated?
No
Pipe RPM (rpm)
Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in)
Comment
Cement Fluids & Additives
Fluid
Fluid Type
Tail Cement
Fluid Description Estimated Top (ftKB)
18,790.0
Est Btm (ftKB)
20,445.0
Amount (sacks)
705
Class
G
Volume Pumped (bbl)
84.0
Yield (ft³/sack)
1.17
Mix H20 Ratio (gal/sack)
4.71
Free Water (%) Density (lb/gal)
15.80
Plastic Viscosity (cP) Thickening Time (hr)
12.00
CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Intermediate String 4 Cement
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report for:
Reviewed By:
P.I. Suprv
Comm ________COLVILLE RIV UNIT CD2-361
JBR 05/23/2023
MISC. INSPECTIONS:
FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK:
ACCUMULATOR SYSTEM:MUD SYSTEM:
P/F P/F
P/FP/FP/F
Visual Alarm
QuantityQuantity
Time/Pressure
SizeQuantity
Number of Failures:1
Tested all gas alarms and PVT's, LEL sensor on rig floor was calibrated and passed retest. Tested with 4 1/2" and 5 7/8" test
joints. Precharge Bottles = 36 Each all @ 1000psi each.
Test Results
TEST DATA
Rig Rep:Zeciri / AgnesOperator:ConocoPhillips Alaska, Inc.Operator Rep:Brown / Lundale
Rig Owner/Rig No.:Doyon 26 PTD#:2211160 DATE:4/24/2023
Type Operation:DRILL Annular:
250/2500Type Test:OTH
Valves:
250/4000
Rams:
250/4000
Test Pressures:Inspection No:bopBDB230426084736
Inspector Brian Bixby
Inspector
Insp Source
Related Insp No:
INSIDE REEL VALVES:
Quantity P/F
(Valid for Coil Rigs Only)
Remarks:
Test Time 10
MASP:
3510
Sundry No:
Control System Response Time (sec)
Time P/F
Housekeeping:P
PTD On Location P
Standing Order Posted P
Well Sign P
Hazard Sec.P
Test Fluid W
Misc NA
Upper Kelly 1 P
Lower Kelly 1 P
Ball Type 2 P
Inside BOP 2 P
FSV Misc 0 NA
16 PNo. Valves
1 PManual Chokes
1 PHydraulic Chokes
0 NACH Misc
Stripper 0 NA
Annular Preventer 1 18 3/4"P
#1 Rams 1 4.5 x 7 5/8 P
#2 Rams 1 Blind/Shear P
#3 Rams 1 3.5 x 6 5/8 P
#4 Rams 0 NA
#5 Rams 0 NA
#6 Rams 0 NA
Choke Ln. Valves 1 3 1/8"P
HCR Valves 2 3 1/16,3 1/8 P
Kill Line Valves 2 3", 3 1/16"P
Check Valve 0 NA
BOP Misc 0 NA
System Pressure P3010
Pressure After Closure P1700
200 PSI Attained P14
Full Pressure Attained P89
Blind Switch Covers:PYES
Bottle precharge P
Nitgn Btls# &psi (avg)P10@3900
ACC Misc NA0
P PTrip Tank
P PPit Level Indicators
P PFlow Indicator
P FPMeth Gas Detector
P PH2S Gas Detector
0 NAMS Misc
Inside Reel Valves 0 NA
Annular Preventer P22
#1 Rams P13
#2 Rams P14
#3 Rams P14
#4 Rams NA0
#5 Rams NA0
#6 Rams NA0
HCR Choke P2
HCR Kill P2
9
9 9999
9
LEL sensor on rig floor was calibrated and passed retest.
FP
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Chris Brillon
Wells Engineering Manager
ConocoPhillips
P.O. Box 100360
Anchorage, AK, 99510
Re: Colville River Field, Alpine Oil Pool, CRU CD2-361
ConocoPhillips
Permit to Drill Number: 221-116 revised
Surface Location: 2181' FNL, 1770' FEL, Sec. 2, T11N, R4E, UM
Bottomhole Location: 1726' FNL, 635' FEL, Sec. 8, T12N, R4E, UM
Dear Mr. Brillion:
Enclosed is the approved application for the permit to drill the above referenced well.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for all well logs
run must be submitted to the AOGCC within 90 days after completion, suspension, or abandonment
of this well, or within 90 days of acquisition of the data, whichever occurs first.
For clarity of the well records, all information, survey data, well logs, and other data from the 3,000'
abandoned section of wellbore must be labeled with the well name and number CRU CD2-361 PB1,
API Number 50-103-20836-70-00, and Permit to Drill Number 221-116.
This permit to drill does not exempt you from obtaining additional permits or an approval required by
law from other governmental agencies and does not authorize conducting drilling operations until all
other required permits and approvals have been issued. In addition, the AOGCC reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an
AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension
of the permit.
Sincerely,
Brett W. Huber, Sr.
Chair, Commissioner
DATED this ___ day of March, 2023. 28
Brett W.
Huber, Sr.
Digitally signed by Brett W.
Huber, Sr.
Date: 2023.03.28 09:32:58
-08'00'
1a. Type of Work: 1b. Proposed Well Class: Exploratory - Gas Service - WAG Service - Disp 1c. Specify if well is proposed for:
Drill Lateral Stratigraphic Test Development - Oil Service - Winj Single Zone Coalbed Gas Gas Hydrates
Redrill Reentry Exploratory - Oil Development - Gas Service - Supply Multiple Zone Geothermal Shale Gas
2. Operator Name:5. Bond: Blanket Single Well 11. Well Name and Number:
Bond No.
3. Address:6. Proposed Depth:12. Field/Pool(s):
MD: 35,306 TVD: 7,198
4a. Location of Well (Governmental Section):7. Property Designation:
Surface:
Top of Productive Horizon:8. DNR Approval Number:13. Approximate Spud Date:
3/25/2023
Total Depth:9. Acres in Property:14. Distance to Nearest Property:
3554' to ADL390345
4b. Location of Well (State Base Plane Coordinates - NAD 27):10. KB Elevation above MSL (ft): 70.7 15. Distance to Nearest Well Open
Surface: x- 371463.9 y- 5974180.2 Zone- 4 15.7 to Same Pool: 4804' to CD2-310
16. Deviated wells:Kickoff depth: 400 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 90 degrees Downhole:Surface:
Hole Casing Weight Grade Coupling Length MD TVD MD TVD
56" 30"328 X65 Welded 80 55 55 135 135
24" 20"133 L-80 TNS-ER 2,425 53 53 2,478 2,411
20" 17"88.1 P-110IC TNS-W521 4,085 2,319 2,264 6,404 4,407
17-1/2" 13-5/8"88.2 L-80IC TNS-W563 12,548 51 51 12,599 5,681
13-1/2" 9-7/8"62.8 L-80 TNS-W563 6,045 12,423 5,645 18,468 6,896 684 sx 15.8 ppg Class G Tail
10-1/4" 7-5/8"29.7 L-80 TNS-W523 2,342 18,103 6,820 20,445 7,134
6-3/4" 4-1/2"12.6 L-80 TNS-W563 15,065 20,241 7,126 35,306 7,198
19.PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations)
Junk (measured):
TVD
Hydraulic Fracture planned?Yes No
20. Attachments: Property Plat BOP Sketch Drilling Program Time v. Depth Plot Shallow Hazard Analysis
Diverter Sketch Seabed Report Drilling Fluid Program 20 AAC 25.050 requirements
Contact Name: Matt Nagel
Chris Brillon Contact Email:Matt.B.Nagel@ConocoPhillips.com
Wells Engineering Manager Contact Phone:907-263-4747
Date:
Permit to Drill API Number: Permit Approval
Number:Date:
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales:
Samples req'd: Yes No Mud log req'd: Yes No
H2S measures: Yes No Directional svy req'd: Yes No
Spacing exception req'd: Yes No Inclination-only svy req'd: Yes No
Post initial injection MIT req'd: Yes No
APPROVED BY
Approved by: COMMISSIONER THE COMMISSION Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
21. I hereby certify that the foregoing is true and the procedure approved herein will not be
deviated from without prior written approval.
Surface
Perforation Depth TVD (ft):
GL / BF Elevation above MSL (ft):
Perforation Depth MD (ft):
1,034 sx 15.8 ppg Class G Tail
Uncemented Liner Beneath Packer
Effect. Depth MD (ft): Effect. Depth TVD (ft):
Authorized Title:
Authorized Signature:
Production
Liner
Intermediate
Authorized Name:
Conductor/Structural
LengthCasing Cement Volume MDSize
Plugs (measured):
(including stage data)
13 yds Slurry
2,655sx 11.0 ppg DeepCRETE Lead
836 sx 15.8 ppg Class G Tail
293 sx 15.8 ppg Class G Tail
4397, 2589, 986, 240, 653, 1427, 853
18. Casing Program:Top - Setting Depth - BottomSpecifications
4229
Total Depth MD (ft): Total Depth TVD (ft):
59-52-180
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
1,219 sx 11.0 ppg Extended Class G
Lead, 471 sx 15.8 ppg Class G Tail
3510
5218' FNL, 950' FEL, Sec. 16, T12N, R4E, UM
1726' FNL, 635' FEL, Sec. 8, T12N, R4E, UM
LONS 97-007
P.O. Box 100360 Anchorage, AK 99510-0360
ConocoPhillips
2181' FNL, 1770' FEL, Sec. 2, T11N, R4E, UM ADL380075 ADL025530 ADL025529 AA084140
ADL388904 ADL380093 ADL390344
CRU CD2-361
Colville River Field
Alpine Oil Pool
Cement Quantity, c.f. or sacks
Commission Use Only
See cover letter for other
requirements.
Stratigraphic Test
Nooo Mud log req'd: Yesss No oo
No Directional svy req'd: Yes Noo
Seabed ReportDrilling Fluid Program 20 AAC 25.050 requirements
BOP SketchDrillingProgram Time v. Depth PlotShallow HazardAnalysis
Single Well
Gas Hydrates
Nooo Inclination-only svy req'd: Yes ss Noo
Exploratory -Oil Development -Gas Service -Supply MultipleZone Geothermal
sss Nooo
s No
Form 10-401 Revised 3/2021 This permit is valid for 24 months from the date of approval per 20 AAC 25.005(g)
By Samantha Carlisle at 12:53 pm, Mar 24, 2023
50-103-20836-00-00
SFD
BOP test to 4000 psig
Annular preventer test to 2500 psig
BOP test frequency is 3 weeks according to attached
OTH-21-018.
221-116
23,875
3/25/2023
X
VTL 03/24/2023
Revised
SFD 3/24/2023GCW 03/28/23JLC 3/28/2023
01/20/2022
3/28/23Brett W. Huber, Sr.Digitally signed by Brett W. Huber, Sr.
Date: 2023.03.28 09:33:36 -08'00'
1
Regg, James B (OGC)
From:Rig 26 <rig26@doyondrilling.com>
Sent:Tuesday, March 14, 2023 9:56 AM
To:Andrew Honea; DOA AOGCC Prudhoe Bay; Doyon 26 Driling Supervisor; Hobbs, Greg S; Regg, James
B (OGC); Brooks, Phoebe L (OGC)
Cc:BLM_AK_AKSO_EnergySection_Notifications; WSC Rig Advisor (wscrigadvisor@conocophillips.com);
Samuel Dye; Ben Wedin; Bill Walter
Subject:Doyon 26 BOP Test 3-13-23
Attachments:CD2-361 Drawdown Worksheet 3-13-23.xlsx; BOP Doyon 26 3-13-2023.xlsx; 3-13-23 Doyon 26
CD2-361 Test Sequence.docx; 3-13-23 Chart #2.pdf; 3-13-23 Chart #1.pdf
All, attached is info for our BOP test date 3‐13‐23
Johnny Newman
Rig 26 Toolpusher
Rig26@doyondrilling.com
Rig Cell 907‐301‐1502
Personal Cell 907‐980‐5303
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
CRU CD2-361PTD 2211160
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
*All BOPE reports are due to the agency within 5 days of testing*
Submit to:jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov
Rig Owner:Rig No.:26 DATE:3/13/23
Rig Rep.:Rig Email:
Operator:
Operator Rep.:Op. Rep Email:
Well Name:PTD #2211160 Sundry #
Operation:Drilling:X Workover:Explor.:
Test:Initial:Weekly:Bi-Weekly:Other:X
Rams:250/4000 Annular:250/2500 Valves:250/4000 MASP:3579
MISC. INSPECTIONS:TEST DATA FLOOR SAFETY VALVES:
Test Result/Type Test Result Quantity Test Result
Housekeeping P Well Sign P Upper Kelly 1 P
Permit On Location P Hazard Sec.P Lower Kelly 1 P
Standing Order Posted P Misc.NA Ball Type 2 P
Test Fluid Water Inside BOP 2 P
FSV Misc 0 NA
BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm
Stripper 0 NA Trip Tank P P
Annular Preventer 1 18-3/4"x5000psi P Pit Level Indicators P P
#1 Rams 1 4-1/2"x7-5/8"P Flow Indicator P P
#2 Rams 1 Blind/Shear P Meth Gas Detector P P
#3 Rams 1 3-1/2"x6-5/8"P H2S Gas Detector P P
#4 Rams 0 NA MS Misc 0 NA
#5 Rams 0 NA
#6 Rams 0 NA ACCUMULATOR SYSTEM:
Choke Ln. Valves 1 3-1/8"x5000psi P Time/Pressure Test Result
HCR Valves 2 3-1/16" & 3-1/8"P System Pressure (psi)3050 P
Kill Line Valves 2 3" & 3-1/16"P Pressure After Closure (psi)1625 P
Check Valve 0 NA 200 psi Attained (sec)11 P
BOP Misc 0 NA Full Pressure Attained (sec)84 P
Blind Switch Covers:All stations Yes
CHOKE MANIFOLD:Bottle Precharge:1000 P
Quantity Test Result Nitgn. Bottles # & psi (Avg.):10 @ 3600 P
No. Valves 16 P ACC Misc 0 NA
Manual Chokes 1 P
Hydraulic Chokes 1 P Control System Response Time:Time (sec)Test Result
CH Misc 0 NA Annular Preventer 22 P
#1 Rams 17 P
Coiled Tubing Only:#2 Rams 17 P
Inside Reel valves 0 NA #3 Rams 16 P
#4 Rams NA
Test Results #5 Rams NA
#6 Rams NA
Number of Failures:0 Test Time:10.5 HCR Choke 2 P
Repair or replacement of equipment will be made within days. HCR Kill 2 P
Remarks:
AOGCC Inspection
24 hr Notice Yes Date/Time 3/10/23 13:43
Waived By
Test Start Date/Time:3/12/2023 18:00
(date)(time)Witness
Test Finish Date/Time:3/13/2023 4:30
BOPE Test Report
Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov
Brian Bixby
Doyon
Test Annular with 4-1/2" & 5-7/8" TJ to 250psi low f/ 5min and 2500psi high f/ 10min. All remaining tests performed to 250psi low
f/ 5min and 4000psi high f/ 10min each, #1 Rams w/ 4-1/2" & 5-7/8" TJ, #3 Rams w/ 4-1/2" & 5-7/8" TJ, Blind Rams, Auto/Man
IBOP, choke valves #1-16, 4-1/2 & 5-7/8 FOSV & Dart valves. Function tested PVT sensors, tested flow Meter and Gas Alarms.
J Newman/ E Fleagle
CPAI
K Hinrichs / M Arthur
CRU CD2-361
Test Pressure (psi):
rig26@doyondrilling.com
d26cm@conocophillips.com
Form 10-424 (Revised 08/2022)2023-0313_BOP_Doyon26_CRU_CD2-361
J. Regg; 6/14/2023
BOP Test - Doyon 26
CRU CD2-361
PTD 2211160
3/13/2023
J. Regg; 6/14/2023
BOP Test - Doyon 26
CRU CD2-361
PTD 2211160
3/13/2023
J. Regg; 6/14/2023
Doyon 26 CD2-361 3-13-23 Test Sequence
4-1/2 & 5-7/8 Test Joint
#1. Annular
#2. UPR/ Valves 1,14,15,16/ kill valve 3/ upper IBOP
#3. Valves 10,13/ HCR kill/ Lower IBOP
#4. Valves 4,9,12/ 5-7/8 FOSV/ Manual kill
#5. Valves 6,8,11/ 5-7/8 Dart
#6. Valves 5,7
#7. Valve 2/ 4-1/2 FOSV
#8. HCR choke/ 4-1/2 Dart
#9. Manual choke
#10. LPR
#11. Blind rams/ valves 3
5-7/8 Test Joint
#12. Annular
#13. UPR
#14. LPR
#15. Choke A
#16. Choke B
J. Regg; 6/14/2023
DOYON RIG 26 ACCUMULATOR DRAW DOWN WORKSHEET
WELL: CD2-361 DATE: 3/13/23
ACCUMULATOR PSI 3050
MANIFOLD PSI 1550
FUNCTION RAMS/ANNULAR/ HCR'S, DON'T FUNCTION BLINDS! FUNCTION ONE RAM TWICE
LET PRSSURE STABILIZE AND RECORD BACK UP NITROGEN BOTTLE'S
ACCUMULATOR PSI 1625
Accumulator bottle pre-charge 1000
NITROGEN BOTTLE'S 10ea 3600psi Avg.
TURN ON ELEC. PUMP, SEC FOR 200 PSI =11 *Tested with both electric pumps
TURN ON AIR PUMP'S
TIME FOR FULL CHARGE =84
J. Regg; 6/14/2023
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report for:
Reviewed By:
P.I. Suprv
Comm ________COLVILLE RIV UNIT CD2-361
JBR 04/05/2023
MISC. INSPECTIONS:
FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK:
ACCUMULATOR SYSTEM:MUD SYSTEM:
P/F P/F
P/FP/FP/F
Visual Alarm
QuantityQuantity
Time/Pressure
SizeQuantity
Number of Failures:1
4.5" and 5 7/8" test joints used. The upper rams had a hydraulic leak from a door seal. Test started on 2/23/23; I left location
after testing was complete but before the seal was repaired.
Test Results
TEST DATA
Rig Rep:A. Zeciri/E. FleagleOperator:ConocoPhillips Alaska, Inc.Operator Rep:R. Bjorhus/M. Arthur
Rig Owner/Rig No.:Doyon 26 PTD#:2211160 DATE:2/24/2023
Type Operation:DRILL Annular:
250/2500Type Test:OTH
Valves:
250/4000
Rams:
250/4000
Test Pressures:Inspection No:bopGDC230223072257
Inspector Guy Cook
Inspector
Insp Source
Related Insp No:
INSIDE REEL VALVES:
Quantity P/F
(Valid for Coil Rigs Only)
Remarks:
Test Time 17
MASP:
3579
Sundry No:
Control System Response Time (sec)
Time P/F
Housekeeping:P
PTD On Location P
Standing Order Posted P
Well Sign P
Hazard Sec.P
Test Fluid W
Misc NA
Upper Kelly 1 P
Lower Kelly 1 P
Ball Type 1 P
Inside BOP 1 P
FSV Misc 0 NA
16 PNo. Valves
1 PManual Chokes
1 PHydraulic Chokes
0 NACH Misc
Stripper 0 NA
Annular Preventer 1 18 3/4" 5000 P
#1 Rams 1 4.5x7 5/8 VB P
#2 Rams 1 Blind/Shear P
#3 Rams 1 3.5x6 5/8 VB P
#4 Rams 0 NA
#5 Rams 0 NA
#6 Rams 0 NA
Choke Ln. Valves 1 3 1/8" 5000 P
HCR Valves 2 3 1/16" 3 1/8"P
Kill Line Valves 2 3" & 3 1/16" P
Check Valve 0 NA
BOP Misc 1 UPR Rams D F
System Pressure P3050
Pressure After Closure P1650
200 PSI Attained P26
Full Pressure Attained P151
Blind Switch Covers:PAll Stations
Bottle precharge P
Nitgn Btls# &psi (avg)P10@4000 ps
ACC Misc NA0
P PTrip Tank
P PPit Level Indicators
P PFlow Indicator
P PMeth Gas Detector
P PH2S Gas Detector
NA NAMS Misc
Inside Reel Valves 0 NA
Annular Preventer P21
#1 Rams P17
#2 Rams P18
#3 Rams P16
#4 Rams NA0
#5 Rams NA0
#6 Rams NA0
HCR Choke P2
HCR Kill P2
9
9
9
9999
9
9
0$63SHU37' SVLMEU
7HVWFKDUWVDWWDFKHG7HVWFRQILUPVUHSDLUV
WRXSSHUSLSHUDPGRRUVHDOMEU
F
upper rams had a hydraulic leak from a door seal. left location
after testing was complete but before the seal was repaired.
0$63SHU37' SVLMEU
9
6QQFS1JQF3BNTBGUFSSFQBJSTUPEPPSTFBMT
DOYON RIG 26 ACCUMULATOR DRAW DOWN WORKSHEET
WELL: CD2-361 DATE: 2/25/22
ACCUMULATOR PSI 3050
MANIFOLD PSI 1650
FUNCTION RAMS/ANNULAR/ HCR'S, DON'T FUNCTION BLINDS! FUNCTION ONE RAM TWICE
LET PRSSURE STABILIZE AND RECORD BACK UP NITROGEN BOTTLE'S
ACCUMULATOR PSI 1650
Accumulator bottle pre-charge 1000
NITROGEN BOTTLE'S 10ea 4000psi Avg.
TURN ON ELEC. PUMP, SEC FOR 200 PSI = 26 * Tested with both electric pumps
TURN ON AIR PUMP'S
TIME FOR FULL CHARGE = 151
1
Regg, James B (OGC)
From:Rig 26 <rig26@doyondrilling.com>
Sent:Sunday, February 5, 2023 1:08 PM
To:Andrew Honea; DOA AOGCC Prudhoe Bay; Doyon 26 Driling Supervisor; Hobbs, Greg S; Regg, James
B (OGC); Brooks, Phoebe L (OGC)
Cc:BLM_AK_AKSO_EnergySection_Notifications; WSC Rig Advisor (wscrigadvisor@conocophillips.com);
Samuel Dye; Ben Wedin; Bill Walter
Subject:Doyon 26 BOP Test 2-5-23
Attachments:2-5-23 BOP Doyon 26 Test Chart 1.pdf; 2-5-23 BOP Doyon 26 Test Chart 2.pdf; 2-5-23 Doyon 26
CD2-361 Test Sequence.pdf; CD2-361 Drawdown Worksheet 2-5-23.xlsx; BOP Doyon 26
2-5-2023.xlsx
All, attached is info for our BOP test date 2‐5‐23
Johnny Newman
Rig 26 Toolpusher
Rig26@doyondrilling.com
Rig Cell 907‐301‐1502
Personal Cell 907‐980‐5303
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Colville River Unit CD2-361PTD 2211160
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
*All BOPE reports are due to the agency within 5 days of testing*
Submit to:jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov
Rig Owner:Rig No.:26 DATE:2/5/23
Rig Rep.:Rig Email:
Operator:
Operator Rep.:Op. Rep Email:
Well Name:PTD #2211160 Sundry #
Operation:Drilling:X Workover:Explor.:
Test:Initial:Weekly:Bi-Weekly:X Other:
Rams:250/4000 Annular:250/2500 Valves:250/4000 MASP:3579
MISC. INSPECTIONS:TEST DATA FLOOR SAFETY VALVES:
Test Result/Type Test Result Quantity Test Result
Housekeeping P Well Sign P Upper Kelly 1 P
Permit On Location P Hazard Sec.P Lower Kelly 1 P
Standing Order Posted P Misc.NA Ball Type 3 P
Test Fluid Water Inside BOP 3 P
FSV Misc 0 NA
BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm
Stripper 0 NA Trip Tank P P
Annular Preventer 1 18-3/4"x5000psi P Pit Level Indicators P P
#1 Rams 1 4-1/2"x7-5/8"P Flow Indicator P P
#2 Rams 1 Blind/Shear P Meth Gas Detector P P
#3 Rams 1 3-1/2"x6-5/8"P H2S Gas Detector P P
#4 Rams 0 NA MS Misc 0 NA
#5 Rams 0 NA
#6 Rams 0 NA ACCUMULATOR SYSTEM:
Choke Ln. Valves 1 3-1/8"x5000psi P Time/Pressure Test Result
HCR Valves 2 3-1/16" & 3-1/8"P System Pressure (psi)2900 P
Kill Line Valves 2 3" & 3-1/16"P Pressure After Closure (psi)1650 P
Check Valve 0 NA 200 psi Attained (sec)28 P
BOP Misc 0 NA Full Pressure Attained (sec)154 P
Blind Switch Covers:All stations Yes
CHOKE MANIFOLD:Bottle Precharge:1000 P
Quantity Test Result Nitgn. Bottles # & psi (Avg.):10@3900 P
No. Valves 16 P ACC Misc 0 NA
Manual Chokes 1 P
Hydraulic Chokes 1 P Control System Response Time:Time (sec)Test Result
CH Misc 0 NA Annular Preventer 16 P
#1 Rams 18 P
Coiled Tubing Only:#2 Rams 19 P
Inside Reel valves 0 NA #3 Rams 15 P
#4 Rams NA
Test Results #5 Rams NA
#6 Rams NA
Number of Failures:0 Test Time:12.5 HCR Choke 2 P
Repair or replacement of equipment will be made within days. HCR Kill 2 P
Remarks:
AOGCC Inspection
24 hr Notice Yes Date/Time 2/3/23 10:49
Waived By
Test Start Date/Time:2/4/2023 12:00
(date)(time)Witness
Test Finish Date/Time:2/5/2023 0:30
BOPE Test Report
Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov
Sully Sullivan
Doyon
Test Annular with 4-1/2" TJ to 250psi low f/ 5min and 2500psi high f/ 10min. All remaining tests performed to 250psi low f/ 5min
and 4000psi high f/ 10min each, #1 Rams w/ 4-1/2" & 7-5/8" TJ, #3 Rams w/ 4-1/2" & 6-5/8" TJ, Blind Rams, Auto/Man IBOP,
choke valves #1-16, 4-1/2, 5-7/8 & 6-5/8" FOSV, 4-1/2, 5-7/8 & 6-5/8" DART valves. Function tested PVT sensors, tested flow
Meter and Gas Alarms. Accumulator Test with 2 electric pumps, #3 Rams functioned a second time to simulate Blind Rams.
J Newman / A Agnes
CPAI
R Bjhorus / A Dorr
CRU CD2-361
Test Pressure (psi):
rig26@doyondrilling.com
d26cm@conocophillips.com
Form 10-424 (Revised 08/2022)2023-0205_BOP_Doyon26_CRU_CD2-361
J. Regg; 6/2/2023
DOYON RIG 26 ACCUMULATOR DRAW DOWN WORKSHEET
WELL: CD2-361 DATE: 2/5/22
ACCUMULATOR PSI 2900
MANIFOLD PSI 1450
FUNCTION RAMS/ANNULAR/ HCR'S, DON'T FUNCTION BLINDS! FUNCTION ONE RAM TWICE
LET PRSSURE STABILIZE AND RECORD BACK UP NITROGEN BOTTLE'S
ACCUMULATOR PSI 1650
Accumulator bottle pre-charge 1000
NITROGEN BOTTLE'S 10ea 3900psi Avg.
TURN ON ELEC. PUMP, SEC FOR 200 PSI =28 *Tested with both electric pumps
TURN ON AIR PUMP'S
TIME FOR FULL CHARGE =154
1
Regg, James B (OGC)
From:Brooks, Phoebe L (OGC)
Sent:Tuesday, January 31, 2023 1:43 PM
To:Rig 26
Cc:Regg, James B (OGC)
Subject:RE: BOP Doyon 26 1-2-2023.xlsx
Attachments:Doyon 26 01-03-23 Revised.xlsx
Attached is a revised report for Doyon 26 01‐03‐23 adding the Number Failures and Test Time (based on the remarks). I
also moved the precharge amount to the remarks (if you want this documented – place it in the comments). Please
update your copy.
Thank you,
Phoebe
Phoebe Brooks
Research Analyst
Alaska Oil and Gas Conservation Commission
Phone: 907‐793‐1242
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential
and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you
are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the
mistake in sending it to you, contact Phoebe Brooks at 907-793-1242 or phoebe.brooks@alaska.gov.
From: Rig 26 <rig26@doyondrilling.com>
Sent: Tuesday, January 3, 2023 2:23 PM
To: Andrew Honea <ahonea@doyondrilling.com>; DOA AOGCC Prudhoe Bay <doa.aogcc.prudhoe.bay@alaska.gov>;
Doyon 26 Driling Supervisor <d26cm@conocophillips.com>; Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com>; Regg,
James B (OGC) <jim.regg@alaska.gov>; Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov>
Subject: BOP Doyon 26 1‐2‐2023.xlsx
Please see attach bop test report.
Thanks,
Rig 26 Tool Pusher
Agim Zeciri
Rig Phone: 907‐670‐4187
Rig 26 Cell: 907‐301‐1502
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
CRU CD2-361PTD 2211160
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
*All BOPE reports are due to the agency within 5 days of testing*
Submit to:jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov
Rig Owner:Rig No.:26 DATE:1/3/23
Rig Rep.:Rig Email:
Operator:
Operator Rep.:Op. Rep Email:
Well Name:PTD #2211160 Sundry #
Operation:Drilling:X Workover:Explor.:
Test:Initial:Weekly:Bi-Weekly:X Other:
Rams:250/4000 Annular:250/2500 Valves:250/4000 MASP:3579
MISC. INSPECTIONS:TEST DATA FLOOR SAFETY VALVES:
Test Result/Type Test Result Quantity Test Result
Housekeeping P Well Sign P Upper Kelly 1 P
Permit On Location P Hazard Sec.P Lower Kelly 1 P
Standing Order Posted P Misc.NA Ball Type 2 P
Test Fluid Water Inside BOP 1 P
FSV Misc 0 NA
BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm
Stripper 0 NA Trip Tank P P
Annular Preventer 1 18-3/4"x5000psi P Pit Level Indicators P P
#1 Rams 1 4-1/2"x7-5/8"P Flow Indicator P P
#2 Rams 1 Blind/Shear P Meth Gas Detector P P
#3 Rams 1 3-1/2"x6-5/8"P H2S Gas Detector P P
#4 Rams 0 NA MS Misc 0 NA
#5 Rams 0 NA
#6 Rams 0 NA ACCUMULATOR SYSTEM:
Choke Ln. Valves 1 3-1/8"x5000psi P Time/Pressure Test Result
HCR Valves 2 3-1/16" & 3-1/8"P System Pressure (psi)3080 P
Kill Line Valves 2 3" & 3-1/16"P Pressure After Closure (psi)1800 P
Check Valve 0 NA 200 psi Attained (sec)17 P
BOP Misc 0 NA Full Pressure Attained (sec)78 P
Blind Switch Covers:All stations Yes
CHOKE MANIFOLD:Bottle Precharge:P
Quantity Test Result Nitgn. Bottles # & psi (Avg.):10@4025 P
No. Valves 16 P ACC Misc 0 NA
Manual Chokes 1 P
Hydraulic Chokes 1 P Control System Response Time:Time (sec)Test Result
CH Misc 0 NA Annular Preventer 22 P
#1 Rams 17 P
Coiled Tubing Only:#2 Rams 16 P
Inside Reel valves 0 NA #3 Rams 18 P
#4 Rams 0 NA
Test Results #5 Rams 0 NA
#6 Rams 0 NA
Number of Failures:0 Test Time:10.0 HCR Choke 2 P
Repair or replacement of equipment will be made within days. HCR Kill 2 P
Remarks:
AOGCC Inspection
24 hr Notice Yes Date/Time 12/31/22 07:50
Waived By
Test Start Date/Time:1/2/2023 23:45
(date)(time)Witness
Test Finish Date/Time:1/3/2023 10:00
BOPE Test Report
Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov
Adam Earl
Doyon
Test Annular with 6-5/8" TJ to 250psi low f/ 5min and 2500psi high f/ 10min. All remaining tests performed to 250psi low f/ 5min
and 4000psi high f/ 10min each, #1 Rams w/ 6-5/8" TJ, #3 Rams w/ 6-5/8" TJ, Blind Rams, Auto/Man IBOP, choke valves #1-16,
6-5/8 FOSV X2 and DART. Function tested PVT sensors, tested flow Meter and Gas Alarms. Bottle precharge - 1000.
A Zeciri / E Fleagle / A Agnes
CPAI
R Bjorhus / A Door
CRU CD2-361
Test Pressure (psi):
rig26@doyondrilling.com
d26cm@conocophillips.com
Form 10-424 (Revised 08/2022)2023-0103_BOP_Doyon26_CRU_CD2-361
J. Regg; 5/24/2023
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
-DQXDU\
&(57,),('0$,/±
5(78515(&(,375(48(67('
0U/XNH/DZUHQFH
:HOOV0DQDJHU
&RQRFR3KLOOLSV$ODVND
*6WUHHW
$QFKRUDJH$.
5H 'RFNHW1XPEHU27+
$SSOLFDWLRQIRU:DLYHURQ&3$,5RWDU\ 5LJ%23(7HVW)UHTXHQF\
'HDU0U/DZUHQFH
%\OHWWHUGDWHG0D\&RQRFR3KLOOLSV$ODVND,QF&3$,UHTXHVWHGDZDLYHUIURPWKH
$ODVND 2LO DQG *DV &RQVHUYDWLRQ &RPPLVVLRQ¶V $2*&& UHJXODWRU\ UHTXLUHG EORZRXW
SUHYHQWLRQHTXLSPHQW%23(WHVWIUHTXHQF\IRUDOO&3$,URWDU\GULOOLQJULJVSHWLWLRQLQJWRWHVW
WKHEORZRXWSUHYHQWLRQHTXLSPHQW%23(RQDGD\WHVWVFKHGXOH$2*&&JUDQWVDSSURYDO
IRUOLPLWHGGXUDWLRQDQGVFRSH
&3$,PHWZLWK$2*&&RQ$SULOVXPPDUL]HGLWVREMHFWLYHLQUHTXHVWLQJDSSURYDORID
GD\%23(WHVWVFKHGXOHLPSURYH&3$,¶VDELOLW\WRFRPSHWHIRUFRUSRUDWH FDSLWDOLQYHVWPHQWV
H[SODLQHGDOLJQPHQWZLWKLQGXVWU\VWDQGDUG%23(WHVWFULWHULD DQG&RQRFR3KLOOLSVJOREDOZHOO
FRQWUROSROLF\DQGSURYLGHGDQRYHUYLHZRIQHZGULOOLQJWDUJHWVSODQQHGXVLQJD³KLJKVSHF
H[WHQGHGUHDFKGULOOLQJULJ´&3$,DOVRSURYLGHGGHWDLOVDERXWWKHVFRSHDQG%23(SHUIRUPDQFH
DFKLHYHPHQWV XQGHU LWV %HWZHHQ :HOO 0DLQWHQDQFH 3URJUDP %:0 IRU URWDU\ GULOOLQJ DQG
ZRUNRYHUULJV
$VZLWKSUHYLRXVUHTXHVWVWRH[WHQGWKH%23(WHVWLQWHUYDO&3$,UHIHUHQFHVQXPHURXVUHJXODWRU\
MXULVGLFWLRQVDVZHOODVVXJJHVWHGLQGXVWU\SUDFWLFHIURPWKH$PHULFDQ3HWUROHXP,QVWLWXWHUHODWLQJ
WR WHVW IUHTXHQF\ HDFK SURYLGLQJIRU %23( WHVWLQJ DW LQWHUYDOV EH\RQG GD\V &3$, DOVR
UHIHUHQFHVLWVLQWHUQDOZHOOFRQWUROPDQXDOZKLFKDOORZVIRUWHVWLQJDWLQWHUYDOVEH\RQGGD\V
ϭW/^ƚĂŶĚĂƌĚϱϯ͕͞tĞůůŽŶƚƌŽůƋƵŝƉŵĞŶƚ^LJƐƚĞŵƐĨŽƌƌŝůůŝŶŐtĞůůƐ͕͟ϱƚŚĚŝƚŝŽŶ;ĞĐĞŵďĞƌϮϬϭϴͿ
ϮK'ĂƉƉƌŽǀĂůŽĨƚŚĞtDƉƌŽŐƌĂŵŚĂƐĞŶĂďůĞĚW/ǁŽƌŬŽǀĞƌƌŝŐƐƚŽĞdžƚĞŶĚƚŚĞŝŶƚĞƌǀĂůďĞƚǁĞĞŶKWƚĞƐƚƐ
ĨƌŽŵĞǀĞƌLJϳĚĂLJƐƚŽŶŽƚĞdžĐĞĞĚŝŶŐϭϰĚĂLJƐ͘W/ĚĂƚĂƐŚŽǁƐƚŚĞtDŚĂƐƌĞĚƵĐĞĚƚŚĞŶƵŵďĞƌŽĨĐŽŵƉŽŶĞŶƚ
ĨĂŝůƵƌĞƐĚƵƌŝŶŐKWƚĞƐƚŝŶŐďLJƌĞƉůĂĐŝŶŐĐŽŵƉŽŶĞŶƚƐƚŚĂƚŝŶĚŝĐĂƚĞƐƵƐƉĞĐƚŝŶƚĞŐƌŝƚLJďĞĨŽƌĞƚŚŽƐĞĐŽŵƉŽŶĞŶƚƐĨĂŝů
ĚƵƌŝŶŐƚĞƐƚŝŶŐ͘
'RFNHW1XPEHU27+
&3$,±GD\%23(7HVW,QWHUYDO
-DQXDU\
,PSURYHPHQW LQ %23( SHUIRUPDQFH WHVWLQJ UHVXOWV DWWULEXWHG WR &3$,¶V %:0 SURJUDP LV
UHFRJQL]HG&3$,LVFRPPHQGHGIRULPSOHPHQWLQJWKHSURJUDPDQGZLWK$2*&&DSSURYDO&3$,
ZRUNRYHUULJV KDYHEHHQDXWKRUL]HGWRWHVW %23( DWLQWHUYDOVXSWR GD\V$2*&&UHFRJQL]HV
WKHFRPSOH[GULOOLQJSURJUDPVWKDWKDYHEHHQLQLWLDWHGE\&3$,WRWDUJHWFKDOOHQJLQJUHVRXUFHV
ZKLOHPDLQWDLQLQJDVPDOOHQYLURQPHQWDOIRRWSULQWDQGWKHFRPPLWPHQWWRXVHUREXVWGULOOLQJULJV
DQGFUHZVWRSHUIRUPWKRVHSURMHFWVLQDVDIHDQGHIILFLHQWPDQQHU,QUHVSRQVHWRWKHVHFKDOOHQJHV
DQG WKH FRPPLWPHQWV E\ &3$, LQFOXGLQJ LPSOHPHQWDWLRQ RI WKH %:0 SURJUDP $2*&&
FRQGLWLRQDOO\DSSURYHG'R\RQ5LJWRWHVW%23(RQDQHYHQWEDVLVLQVWHDGRIDWVSHFLILFWLPH
LQWHUYDOVZKLOHGULOOLQJVSHFLILFLQWHUYDOV LQDQXOWUDH[WHQGHGUHDFKZHOO
&3$,¶VUHTXHVWIRUD YDULDQFHIURPUHJXODWRU\UHTXLUHPHQWV RI$$&H$LV
DSSURYHGIRUGULOOLQJULJV'R\RQDQG'R\RQDVDSLORWSURMHFWZLWKWKHIROORZLQJFRQGLWLRQV
7KHSLORWWHVWGXUDWLRQLVIRU21( \HDU IURPWKHDSSURYDOGDWHRIWKLVOHWWHUVXEMHFWWR
SRWHQWLDOH[WHQVLRQDQG H[SDQVLRQWRLQFOXGHRWKHU&3$,RSHUDWHGULJVZLWK DWOHDVW
PRQWKVRIFRQWLQXRXVULJZRUNDQG$2*&&UHYLHZRIDULJ¶V%23(V\VWHPUHOLDELOLW\
&3$,PXVWFRQWLQXHWRLPSOHPHQWWKH%:0SURJUDPDVDSSURYHGE\$2*&&
'HYHORSPHQWGULOOLQJZHOOVRQO\DUHLQFOXGHGLQWKLVDSSURYDO
7KHLQLWLDOWHVWDIWHUULJJLQJXS%23(WRGULOODZHOOPXVWEHWRWKHUDWHGZRUNLQJSUHVVXUH
DVSURYLGHGLQ$3,6WDQGDUG
&3$,LVHQFRXUDJHGWRWDNHDGYDQWDJHRIRSSRUWXQLWLHVWRWHVW5LJVPXVWWHVWEHIRUH
UHHQWHULQJWKHZHOOLIDWULSWRVXUIDFHRFFXUVZLWKLQGD\VRIWKHGXHGDWHXQOHVVRWKHUZLVH
DSSURYHGE\$2*&&
&3$,PXVWDGKHUHWRRULJLQDOHTXLSPHQWPDQXIDFWXUHUUHFRPPHQGDWLRQVDQGUHSODFHPHQW
SDUWVIRU%23(
5HTXHVWV IRU H[WHQVLRQV EH\RQG GD\V PXVW LQFOXGH MXVWLILFDWLRQ ZLWK VXSSRUWLQJ
LQIRUPDWLRQGHPRQVWUDWLQJWKHDGGLWLRQDOWLPHLVQHFHVVDU\IRUZHOOFRQWUROSXUSRVHVRUWR
PLWLJDWHDVWXFNGULOOVWULQJ
KRXUDGYDQFHQRWLFHIRUD%23(WHVWVKDOOEHSURYLGHGWR$2*&&IRURSSRUWXQLW\WR
ZLWQHVV
,I\RXKDYH TXHVWLRQVUHJDUGLQJWKLV SOHDVH FRQWDFW-LP5HJJ DW
6LQFHUHO\
-HUHP\0 3ULFH
&KDLU&RPPLVVLRQHU
FF *UHJ+REEV&3$,
0LNH.QHDOH&3$,
9LFWRULD/RHSS$2*&&
$2*&&,QVSHFWRUVHPDLO
Jeremy
Price
Digitally signed by
Jeremy Price
Date: 2022.01.25
13:00:50 -09'00'
ConocoPhillips Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
March 24, 2023
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
Re: Application for Permit to Drill CRU CD2-361
Dear Sir or Madam:
ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore producer well from the CD2 drilling pad. The spud
date for this well was December 10, 2022 using Doyon Rig 26 to drill the well.
CD2-361 is planned to be a lateral Kuparuk C sand producer. The 24” Surface section was drilled to TD above the C-30 sand
and then 20” casing was set and cemented to surface. The intermediate hole was drilled in four sections to mitigate issues with
drilling the extended overburden section.
The 17-1/2” x 20” Intermediate 1 section was drilled to 6,445’ MD and landed at an inclination of 78°. A 17” liner was set and
cemented from TD to secure the shoe isolate the Qannik and C-10 reservoir. The 15-3/4” x 17-1/2” Intermediate 2 section was
drilled at 78° inclination through the Albian 97 to 12,607’MD. A 13-5/8” casing was set and cemented to 250’ TVD above the
shoe. The 12-1/4” x 13-1/2” Intermediate 3 section was drilled to 18,468’MD and into the HRZ. A 9-7/8” liner was set and
cemented to 250’ TVD above the shoe. The 8-1/2” x 10-1/4” Intermeidate 4 section was drilled through the HRZ and Kalubik
and was landed within the Kuparuk C target reservoir at 20,448’ MD. A 7-5/8” liner was set and cemented.
The 6-3/4” Production section was geosteered within the Kuparuk C target reservoir. The wellbore will be sidetracked within
the 6-3/4” section and will be geosteered within the Kuparuck C to investiage another section of the reservoir. A 4-1/2” pre-
perforated liner will be set and the well will be completed with a tapered 5” x 4-1/2” tubing upper completion string.
It is requested that a variance of diverter line size under 20 AAC 25.035 (c)(1)(B) is granted to allow drilling a 24” surface hole
with a 16” diverter line using Doyon 26 as per Docket OTH-17-048.
Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information
attached to this application includes the following:
1. Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a)
2. A proposed drilling program
3. A proposed completion diagram
4. A drilling fluids program summary
5. Pressure information as required by 20 ACC 25.035 (d)(2)
6. Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b)
Information pertinent to the application that is presently on file at the AOGCC:
1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC
25.035 (a) and (b).
2. A description of the drilling fluids handling system.
3. Diagram of riser set up.
If you have any questions or require further information, please contact Matt Nagel at 907-263-4747
(Matt.B.Nagel@ConocoPhillips.com) or Chris Brillon at 265-6120.
Sincerely, cc:
CD2-361 Well File / Jenna Taylor ATO 540
David Lee ATO 1726
Chris Brillon ATO 1796
Matt Nagel Layla Unger ATO 1756
Drilling Engineer Andy Mack Kuukpik Corp
g
A 7-5/8” liner was set and cemented.
wellbore will be sidetracked withingpg
the 6-3/4” section and will be geosteered within the Kuparuck C to investiage another section of the reservoir. A
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 1 of 21 Printed: 24-Mar-23
CD2-361
AOGCC Application for Permit to Drill Document
Table of Contents
1. Well Name (Requirements of 20 AAC 25.005 (f)) .................................................................................... 2
2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) ................................................... 2
3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005(c)(3)) .......... 2
4. Drilling Hazards Information (Requirements of 20 AAC 25.005 (c)(4)) ................................... 3
5. Procedure for Conducting Formation Integrity Tests
(Requirements of 20 AAC 25.005 (c)(5)) ......................................................................................... 4
6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) ............................. 5
7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)).................................... 5
8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8)) .............................................. 6
9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005 (c)(9)) ..... 7
10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10)) .................................................... 7
11. Seabed Condition Analysis (Requirements of 20 AAC 25.005 (c)(11)) ................................... 7
12. Evidence of Bonding (Requirements of 20 AAC 25.005 (c)(12)) .............................................. 7
13. Proposed Drilling Program (Requirements of 20 AAC 25.005 (c)(13)) .................................... 8
14. Discussion of Mud and Cuttings Disposal and Annular Disposal ..................... 11
(Requirements of 20 AAC 25.005 (c)(14)) ..................................................................................... 11
15. Attachments ........................................................................................................... 11
Attachment 1 Cement Summary
Attachment 2 Drilling Hazards Summary
Attachment 3 Completion Schematic
Attachment 4 Property Plat
Attachment 5 Directional Plan CD2-361
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 2 of 21 Printed: 24-Mar-23
1. Well Name (Requirements of 20 AAC 25.005 (f))
The well for which this application is submitted will be designated as CRU CD2-361.
2. Location Summary (Requirements of 20 AAC 25.005(c)(2))
Location at Surface (CD2-361 Slot) 2,181‘ FNL, 1,770' FEL, Sec. 2, T11N, R4E, UM
NAD27
Northings: 5,974,180
Eastings: 371,464
RKB Elevation 70.2’ AMSL
Pad Elevation 15.7’ AMSL
Location at Productive Horizon (Heel) 5,218' FNL, 950' FEL, Sec. 16, T12N, R4E, UM
NAD27
Northings: 5,981,348
Eastings: 369,237
Measured Depth, RKB: 20,233’
Total Vertical Depth, RKB: 7,103’
Total Vertical Depth, SS: 7,031’
Location at Total Depth (Toe) 1,726' FNL, 635' FEL, Sec. 8, T12N, R4E, UM
NAD27
Northings: 6,001,296
Eastings: 357,198
Measured Depth, RKB: 35,306’
Total Vertical Depth, RKB: 7,198’
Total Vertical Depth, SS: 7,126’
Requirements of 20 AAC 25.050(b)
Please see Attachment 4: CD2-361 wp08 (ST) Directional Plan
The Applicant is the only affected owner.
3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005(c)(3))
Please reference BOP and diverter schematics on file for Doyon 26.
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 3 of 21 Printed: 24-Mar-23
4. Drilling Hazards Information (Requirements of 20 AAC 25.005 (c)(4))
The following shows the calculation results of anticipated surface pressure (ASP) while drilling this well:
Casing Size
(in)
Casing Set Depth
MD/TVD (ft)
Fracture
Gradient
(ppg)
Pore
Pressure
(psi)
ASP Drilling
(psi)
30 150 / 150 10.9 60 64
20 2,478 / 2,411 12.5 1,061 1,326
17 6,404 / 4,407 13.0 1,939 1,929
13-5/8 12,599 / 5,681 13.2 2,500 2,413
9-7/8 18,468 / 6,896 13.2 3,103 3,479
7 5/8 20,445/ 7,134 15.7 4,192 3,510
5-1/2 35,306/ 7,198 14.4 4,229 N/A
PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP)
ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a
gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to
the surface as follows:
1) ASP = [(FG x 0.052) - 0.1] x D
Where: ASP = Anticipated Surface pressure in psi
FG = Fracture gradient at the casing seat in lb/gal
0.052 = Conversion from lb/gal to psi/ft
0.1 = Gas gradient in psi/ft
D = true Vertical depth of casing seat in ft RKB
OR
2) ASP = FPP – (0.1 x D)
Where: FPP = Formation Pore Pressure at the next casing point
FPP = 0.44psi/ft x TVD above HRZ & 0.45psi/ft below HRZ unless otherwise specified
(A) ASP Calculations Per Interval
1. Drilling Below 30” Conductor:
ASP = [(FG x 0.052) – 0.1] x D
= [(12.5x 0.052) – 0.1] x 135 = 64psi
OR
ASP = FPP – (0.1 x D)
= 1,059 – (0.1 x 2,411) = 820psi
2. Drilling Below 20” Surface Casing
ASP = [(FG x 0.052) – 0.1] x D
= [(12.5 x 0.052) – 0.1] x 2,411’ = 1,326psi
OR
ASP = FPP – (0.1 x D)
= 1,939 – (0.1 x 4407’) = 1,498psi
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 4 of 21 Printed: 24-Mar-23
3. Drilling Below 17” Intermediate 1 Drilling Liner
ASP = [(FG x 0.052) – 0.1] x D
= [(13.2 x 0.052) – 0.1] x 4,407’ = 2,533psi
OR
ASP = FPP – (0.1 x D)
= 2,500 – (0.1 x 5,681’) = 1,932psi
4. Drilling Below 13-5/8” Intermediate 2 Production Liner
ASP = [(FG x 0.052) – 0.1] x D
= [(13.2 x 0.052) – 0.1] x 5,681 = 3,507psi
OR
ASP = FPP – (0.1 x D)
= 3,103 – (0.1 x 6,896) = 2,413psi
5. Drilling Below 9-7/8” Intermediate 3 Production Liner
ASP = [(FG x 0.052) – 0.1] x D
= [(15.7 x 0.052) – 0.1] x 6,896 = 4,940psi
OR
ASP = FPP – (0.1 x D)
= 4,192 – (0.1 x 7,134) = 3,479psi
NOTE: 11.3ppg Kuparuk C Pressure
6. Drilling Below 7-5/8” Intermediate 3 Production Liner
ASP = [(FG x 0.052) – 0.1] x D
= [(14.4 x 0.052) – 0.1] x 7,137 = 4,628psi
OR
ASP = FPP – (0.1 x D)
= 4,229 – (0.1 x 7198) = 3,510psi
NOTE: 11.3ppg Kuparuk C Pressure
(B) data on potential gas zones;
The well bore is not expected to penetrate any hydrates nor gas zones.
(C) data concerning potential causes of hole problems such as abnormally geo-pressured strata,
lost circulation zones, and zones that have a propensity for differential sticking;
Please see Attachment 2 - Drilling Hazards Summary
5. Procedure for Conducting Formation Integrity Tests (Requirements of 20 AAC 25.005 (c)(5))
Drill out casing or liner shoe and perform LOT test or FIT in accordance with the COP ERD LOT / FIT
procedure that ConocoPhillips Alaska has on file with the Commission.
()
NOTE: 11.3ppg Kuparuk C Pressure
()p
NOTE: 11.3ppg Kuparuk C Pressure
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 5 of 21 Printed: 24-Mar-23
6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6))
Casing and Cementing Program
Csg/Tbg
OD (in)
Hole
Size (in)
Weight
(lb/ft) Grade Conn. Length
(ft)
Top MD/TVD
(ft)
Btm MD/TVD
(ft) Planned Cement Program
30 56 328 X65 Welded 80 54.5 / 54.5 135 / 135 Cemented to Surface with
13 yds slurry
20 24 133.0 L-80 Hydril
W563 2,425 53 / 53 2,478 / 2,411
Cement to Surface with
2,655 sx DeepCRETE Lead at 11.0ppg,
836 sx Class G Tail at 15.8ppg
17 17-1/2 x
20 88.1 P-110
IC
Hydril
W521 4,085 2,319 / 2,264 6,404 / 4,407
1,219 sx Extended Class G Lead at
11.0ppg
471 sx Class G Tail at 15.8ppg
13-5/8 14-3/4 x
17-1/2 88.2 L-80
IC
Hydril
W563 12,548 52 / 52 12,599 / 5,681 1,219 sx Class G Tail at 15.8ppg
9-7/8 12-1/4 x
13-1/2 62.8 L-80 Hydril
W563 6,045 12,423 / 5,645 18,468 / 6,896 1,034 sx Class G Tail at 15.8ppg
7-5/8 8-½ x
10-1/4 29.7 L-80 Hydril
W523 2,342 18,103 / 6,820 20,445 / 7,134 293 sx Class G Tail at 15.8ppg
5 n/a 24.1 L-80 Hydril
W563 4,977 46 / 46 5,023 / 4,088 N/A – Upper Part of Tapered Upper
Completion Tubing String
4-1/2 n/a 12.6 L-80 Hydril
W563 15,218 5,023 / 4,088 20,241 / 7,126 N/A – Lower Part of Tapered Upper
Completion Tubing String
4-1/2 6-3/4 12.6 L-80 Hydril
W563 15,065 20,241 / 7,126 35,306 / 7,198 N/A – Uncemented Open Hole Liner w/
Pre-Perforated Pup Joints
7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7))
CPAI requests a variance to the diverter requirement under 20 AAC 25.035 (h)(2) be granted.
CD2-361 meets the requirements as outlined below:
1. The well is a development well drilled by Doyon 26 from an existing drill site.
a. CD2-361 is a development well being drilled by Doyon 26 from CD2.
2. At least one previously drilled borehole has penetrated the horizontal circle with a radius of 500
feet centered on the proposed location of the surface casing shoe of the well to be drilled.
a. There are eight wells within a 500’ radius of the proposed CD2-361 surface shoe at
2,466’ MD: CD2-162 (~61’), CD2-32 (~311’), CD2-25 (~317’), CD2-22 (~388’), CD2-33
(~392’), CD2-23 (~468’), CD2-17 (~487’), and CD2-46 (~492’).
3. There have been no significant gas shows or well control events while any borehole was drilled to
the depth of the surface casing shoe within the 500-foot radius circle.
a. There are fifty-three wells within a 500’ radius across the CD2-361 surface hole interval.
There have been no significant indications of shallow gas or gas hydrates while drilling
from CD2 pad including on CD2-162 where a surface hole was drilled to 4,011’ TVD in
2019.
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 6 of 21 Printed: 24-Mar-23
8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8))
Surface Intermediate
#1
Intermediate
#2
Intermediate
#3
Intermediate
#4 Production
Hole Size in 24 17-1/2 x 20 14-3/4 x 17-
1/2
12-1/4 x
13-1/2
8-1/2 x 10
1/4 8-1/2
Casing
Size in 20 17 13-5/8 9-7/8 7-5/8 5-1/2
Density ppg 9.5 – 10.0 10.5 – 11.0 10-11 10.5 – 12.2 11-12.5 10.5 – 12.2
PV cP 9 – 10 12 – 13 9-10 13 – 21 20-30 11
YP
lb./
100
ft2
45 – 50 25 – 40 25 – 40 20 – 30 30-40 15 - 25
Initial
Gels
lb./
100
ft2
46 14 15 10 10 7
10
Minute
Gels
lb./
100
ft2
48 15 25 23 13 8
API Fluid
Loss
cc/
30
min
N.C. – <
10.0 4 – 12 2 – 10 < 6 < 6 < 6
pH 11.0 9.0 – 10.0 9.0 – 10.0 9.0 – 10.5 9.0-10.5 9.0 – 9.5
Surface Hole:
The Surface interval will be drilled with a mixed-metal oxide freshwater drilling fluid (DRILPLEX WBM).
Keep flow line viscosity at r 200 sec/qt while drilling and running casing. Reduce viscosity prior to
cementing. Maintain mud weight 10.0ppg through the base of Permafrost and increase to 10.0ppg prior
to TD. Control LGS using solids control system and dilutions where necessary.
Intermediate #1:
The Intermediate 1 interval will be drilled with a fresh water gel / polymer drilling fluid (LSND WBM).
Ensure good hole cleaning by maximizing fluid annular velocity and rotary speed. Maintain mud weight
from 10.5 – 11.0ppg for shallow instability and be prepared to add loss circulation material or weight-up
as needed for actual Qannik pore pressure. Good filter cake quality, hole cleaning and maintenance of
low gravity drill solids (by diluting as required) will all be important in maintaining good hole conditions.
Intermediate #2:
The Intermediate 2 interval will be drilled with a fresh water gel / polymer drilling fluid (LSND WBM).
Ensure good hole cleaning by maximizing fluid annular velocity and rotary speed. Maintain mud weight
from 10.5 – 11.0ppg for instability. MPD maybe used to prevent cycling on the formation. Good filter cake
quality, hole cleaning and maintenance of low gravity drill solids (by diluting as required) will all be
important in maintaining good hole conditions.
Intermediate #3:
The Intermediate 3 interval will be drilled with fresh water gel / polymer drilling fluid (LSND WBM) to
properly condition the hole for the floated liner run. Ensure good hole cleaning by maximizing fluid annular
velocity and adjusting drilling parameters. Condition the mud using dilutions as required to maintain low
gravity drill solids. Weight-up to 11.0-11.5ppg at TD and adjust tripping parameters to ensure clean hole
prior to floating the 9-7/8” liner to bottom. MPD will used on this hole section to minimize cycling and
improve instability.
10.5 – 12.2
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 7 of 21 Printed: 24-Mar-23
Intermediate #4:
The Intermediate 4 interval will be drilled with an synthetic based mud (NAF SBM) to mitigate wellbore
instability and to properly condition the hole for the floated liner run. Ensure good hole cleaning by
maximizing fluid annular velocity. There is potential for lost circulation so ensure adequate LCM material
is available on location to address any unexpected losses. Good filter cake quality, hole cleaning, and
maintenance of low gravity drill solids (by diluting as required) will all be important in maintaining good
hole conditions. Mitigate wellbore instability with MPD targeting ~13.2ppg EMW and Lower Shale specific
mud additives. Weight-up as needed at 9 7/8” shoe to the greater of 13.0-13.2ppg EMW for wellbore
instability mitigation or as needed for Kuparuk C pore pressure.
Production Hole:
The Production interval will be drilled with a water-based drill-in fluid (FLO-PRO WBM) weighted
appropriately so that MPD can provide a dynamic overbalance of ~11.7ppg EMW while reducing the risk
of lost circulation created by high ECDs. There is potential for lost circulation so ensure adequate LCM
material is available on location to address any losses. There is a potential for abnormal pressure so
ensure adequate weighting material is on location to weight-up as needed. Kill-weight brine will be placed
in the well prior to pulling out of hole.
Please reference pit diagram on file for Doyon 26. All drilling fluid practices will be in accordance with
appropriate regulations stated in 20 AAC 25.033.
9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005 (c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis (Requirements of 20 AAC 25.005 (c)(11))
N/A - Application is not for an offshore well.
12. Evidence of Bonding (Requirements of 20 AAC 25.005 (c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
This wellbore. SFD 3/24/2023
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 8 of 21 Printed: 24-Mar-23
13. Proposed Drilling Program (Requirements of 20 AAC 25.005 (c)(13))
The proposed drilling program is listed below. Please refer to Completion Schematic.
1. MIRU Doyon 26 onto CRU CD2-361 over pre-installed 30” x 48” insulated conductor.
2. Dewater cellar, rig-up riser, & test same.
3. Pick-up enough 6-5/8” VX69 drill pipe to drill SURF section and rack-back.
4. Make-up 24” Conductor Clean-Out BHA. Clean-out conductor.
5. Make-up 24” SURF Drilling BHA (LMWD Program: GR/DIR), spud well, & directionally-drill 24” hole to SURF TD
estimated at 2,478’ MD / 2,411’ TVD top-setting the C-30 and as per the directional plan. 9.5 – 10ppg DRILPLEX
WBM will be used to drill the section.
6. Circulate & condition, flow-check well, and POOH. Lay-down SURF Drilling BHA.
7. Run new 20” 133# L-80 TNS-ER SURF casing centralized as per design to section TD. Circulate & condition,
land casing on hanger within wellhead, and back-off upper half of landing joint.
8. Pick-up & TIH with the SURF Inner String BHA, stab into the inner string float collar, and establish circulation.
9. Cement the 20” SURF casing to surface as per the cement program with 500’ of 15.8ppg Class G tail and
11.0ppg DeepCRETE lead to surface. Bump inner string darts, bleed pressure, & check floats.
a. CONTINGENCY: If cement is not brought to surface, notify AOGCC and prepare for top job.
10. Flow check well, N/D flow riser & N/U HP Riser & BOPE with the following equipment/configuration:
a. 18-5/8” Annular / Upper 4-1/2” x 7-5/8” VBR / Blind/Shear Ram / Lower 4-1/2” x 7-5/8” VBR
11. Test BOPE to 250psi low / 4,000psi high. Test annular to 250psi low / 2,500psi high. (Provide 48 hr. AOGCC
notice)
12. Pick-up & TIH with the 17-1/2” x 20” INTRM1 Drilling BHA (LMWD Program: GR/RES/DIR).
a. CONTINGENCY: If unable to clean-out SURF casing shoe track with INTRM1 Drilling BHA, drill out
SURF casing shoe track with dedicated SURF Casing Clean-Out BHA and perform FIT.
13. Chart 20” SURF casing pressure test to 3,000psi for 30 minutes.
14. Drill-out shoe track, 24” rathole, and 20’ of new hole. Circulate & condition.
15. Perform FIT to minimum 11.5ppg EMW.
16. Displace well to 10.5ppg LSND WBM.
17. Directionally drill 17-1/2” INTRM1 Pilot Hole until the underreamer is below the 20” SURF Casing Shoe and open
the underreamer.
18. Directionally drill 17-1/2” x 20” INTRM1 Hole past the Base Qannik. Circulate a minimum 1x bottom’s up and flow
check the well to determine if additional overbalance is needed.
19. Directionally drill 17-1/2” x 20” INTRM1 Hole to INTRM1 TD at 6,404’ MD / 4,407’ TVD as per the directional
plan. Circulate & condition while weighting up as needed for a trip margin.
20. Observe well for flow while rotating at 20 rpm to avoid differential sticking.
21. POOH and lay-down the 17-1/2” INTRM1 Drilling BHA.
22. Change Upper 4-1/2” x 7-5/8” VBRs to 17” Solid-Body Rams. Test same to 250psi low / 3,000psi high. (Provide
48 hr. AOGCC notice)
23. Run new 17” 88.1# P-110 IC TSH-521 liner centralized as per design. Circulate & condition prior to exiting the
SURF Casing Shoe and again before making-up the Liner Hanger.
24. M/U the 17” x 20” INTRM1 Liner Hanger / Running Tool Assembly and TIH with the 17” INTRM1 liner to above
rat hole. Once there, circulate & condition as needed in preparation for the cement job.
25. Cement the 17” INTRM1 liner with sufficient 13.5ppg Extended Class G led to provide 500’ isolation above the
Top Qannik and C10 and a 500’ 15.8ppg tail to tack the 17” INTRM1 Liner Shoe. Bump plugs to 500psi over
circulating pressure, bleed pressure, & check floats.
a. CONTINGENCY: If cement is not circulated above the Qannik and C10, drill, case, cement INTRM2.
Intrm 1 is a drilling liner and will be covered by Intrm 2 long string.
26. Set the 17” x 20” TIW XPAK Liner Hanger. Perform overpull test to confirm hanger set.
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 9 of 21 Printed: 24-Mar-23
27. Perform Liner-Top test to 1,000psi.
28. Pick-up to release running tools from Liner Hanger. Circulate & condition. Flow-check well.
29. TOH on elevators. Lay-down INTRM1 Liner Running Tools.
30. Change 17” Solid-Body Rams back to 4-1/2” x 7-5/8” VBRs. Test same to 250 / 3,000psi. (Provide 48 hr.
AOGCC notice)
31. Pick-up & TIH with 15-3/4” INTRM1 Clean-Out BHA to the 17” INTRM1 Liner top.
32. Circulate & condition, drill-out pack-off bushing below Liner Hanger, circulate bottom’s up, and continue TIH.
33. Chart 20” casing x 17” liner pressure test to 3,000psi for 30 minutes.
34. Drill-out shoe track, 17-1/2” x 20” rathole, and 20’ of 15 ¾” new hole. Circulate & condition.
35. Perform FIT to minimum 11.5ppg EMW.
36. Circulate & condition, observe well for flow, and TOH. Lay-down the 15-3/4” INTRM1 Clean-Out BHA.
37. Pick-up & TIH with 14-3/4” x 17-1/2” INTRM2 Drilling BHA to the 17” INTRM1 Liner Shoe (LMWD Program:
GR/RES/DIR).
38. Displace the well to 10.5ppg LSND WBM.
39. Open underreamer and directionally-drill 15-3/4” x 17-1/2” INTRM2 hole to TD at 12,599’ MD.
a. This hole section is the upper part of the original 5 string INT2 hole section, the drilling/tripping out time
is estimated to be over 14 days. To avoid the high risk of stuck pipe, ConocoPhillips is requesting to
continue the approved Event Based BOP testing schedule from original INT2. Perform full BOP test
once BHA out of hole.
40. POOH and lay-down 15-3/4” x 17-1/2” INTRM2 Drilling BHA.
41. Change Upper 4-1/2” x 7-5/8” VBRs to 13-5/8” Solid-Body Rams. Test same to 250psi low / 3,000psi high.
(Provide 48 hr. AOGCC notice)
42. Float new 13-5/8” 88.2# L-80 IC TSH-563 INTRM2 Casing centralized as per design to TD; attempt to run on
elevators and rotate only if needed to move past a ledge or to break axial friction.
43. Circulate & condition in preparation for the cement job.
44. Cement the 13-5/8” INTRM2 liner with sufficient 15.8ppg Class G to tack the INTRM2 casing shoe with 250’ TVD
slurry.
45. Install pack off and displace the 13-5/8” x 17” x 20” annulus to corrosion-inhibited seawater and diesel freeze-
protect.
46. Change 13-5/8” solid body rams back to 4-1/2” x 7-5/8” VBRs. Test same to 250 / 4,000psi. (Provide 48 hr.
AOGCC notice)
47. Pick-up & TIH with 12-1/4” x 13-1/2” INTRM3 Drilling BHA (LMWD Program: GR/RES/NEU/DEN/DIR).
48. Chart 13-5/8” INTRM2 casing pressure test to 4,000psi for 30 minutes.
49. Drill-out shoe track, 14-3/4” x 17-1/2” rathole, and 20’ of new 12-1/4” hole.
50. Perform FIT to minimum 13.0ppg EMW.
51. Displace well to 11.0ppg LSND WBM.
52. Directionally drill 12-1/4 x 13-1/2” new INTRM3 hole to TD 10’ TVD below the Top HRZ estimated at 18,468’ MD
/ 6,896’ TVD.
a. This hole section is the lower part of the original 5 string INT2 hole section, the drilling/tripping out time
is estimated to be over 14 days. To avoid the high risk of stuck pipe, ConocoPhillips is requesting to
continue the approved Event Based BOP testing schedule from original INT2. Perform full BOP test
once BHA out of hole.
53. Circulate & condition hole while weighting-up to 11.5ppg. Observe well for flow.
54. POOH and lay-down 12-1/4 x 13-1/2” INTRM3 Drilling BHA.
55. Change Upper 4-1/2” x 7-5/8” VBRs to 9-7/8” Solid-Body Rams. Test same to 250psi low / 4,000psi high.
(Provide 48 hr. AOGCC notice)
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 10 of 21 Printed: 24-Mar-23
56. Float 9-7/8” 62.8# L-80 TSH-563 new INTRM3 Liner centralized as per design to TD. Cement the same with
15.8ppg Class G to 250’ TVD above the shoe.
57. Set the Liner Hanger. Test the backside to 1,000 psi for integrity.
58. POOH and L/D liner hanger running tool.
59. Change Upper back to 4-1/2” x 7-5/8” VBRs. Test same to 250psi low / 4,000psi high. (Provide 48 hr. AOGCC
notice)
60. Pressure tests the 9-7/8” liner and 13-5/8” casing to 3,500psi for 30 minutes.
61. Pick-up & TIH with 8-1/2” x 10-1/4” INTRM4 Drilling BHA (LMWD Program: GR/RES/NEU/DEN/DIR).
62. Displace well to 11.5ppg NAF SBM.
63. Drill-out shoe track and 20’ of new hole. Perform FIT to minimum 11.1ppg EMW.
64. Directionally drill 8-1/2” x 10-1/4” hole to section TD within the Fiord West Kuparuk C at 20,445’ MD / 7,134’ TVD
using MPD to target 12.3ppg EMW at 7,250’ TVD.
65. SOOH to 9 7/8” shoe.
66. Circulate & weight up the mud to 13.1ppg kill-weight NAF SBM.
67. Flow check, SOOH, and lay-down 8-1/2” x 10-1/4” Drilling BHA.
68. Run new 7-5/8” 29.7# L-80 TSH-523 INTRM3 Liner to TD.
69. Cement the 7-5/8” liner with 15.8ppg tail Class G to 250’ TVD above the top of Kuparuk C reservoir.
70. Set liner hanger and perform 1,000 psi back pressure test.
71. POOH and L/D liner hanger running tool.
72. Pressure test 13-5/8” x 9-7/8” x 7-5/8” Liner pressure test to 3,500psi for 30 minutes.
73. Pick-up & TIH with 6-3/4” PROD Drilling Assembly (LMWD Program: GR/RES/NEU/DEN/DIR).
74. Displace well to new 11.1ppg FLO-PRO WBM.
75. Drill out shoe track, 8-1/2” x 10-1/4” rat hole, and 20’ of new hole. Perform FIT to minimum of 13.5ppg EMW.
76. Directionally drill 6-3/4" hole to the 25,966’ MD. Due to reservoir uncertainty SOOH to 23,875’ MD and perform
an open hole sidetrack within the Kuparuk C.
77. Directionally drill 6-3/4” hole Production TD at 35,306’ MD geo-steering to stay within the Kuparuk C while using
MPD to target 11.7 EMW at 7 5/8” Shoe.
78. Circulate & condition. BROOH to the 7-5/8” INTRM3 liner shoe and further as needed to clean up the well.
79. Strip-in back to bottom.
80. Circulate & condition, displace well to kill-weight brine, flow check, & TOH. Lay-down 6-3/4” PROD Drilling BHA.
81. Run new 4-1/2” 12.6# L-80 TSH 563 Liner with pre-perforated pups centralized as per design.
82. Pick-up the 7 5/8” x 5-1/2” Liner Hanger / Packer with Running Tool Assembly to the Rig Floor. Make-up to the
liner hanger.
83. TIH with 4-1/2” PROD Liner; rotate as needed to reduce axial friction and run to TD. Circulate as needed through
the open circulation sub.
84. With the liner on bottom, set the liner top packer as per equipment specs.
85. Release running tools, perform ~1,000psi liner-top test to confirm packer & liner barrier integrity.
86. TOH on elevators. Lay-down PROD Liner Running Tools.
87. Run 5” x 4-1/2” Upper Completion with smart gas lift mandrels. Space out, pick-up, & with the annular closed on
landing string, spot diesel freeze-protect. Land tubing hanger & pressure-up to set packer. Confirm connectivity
to smart GLMs.
88. Install BPV and pressure test hanger seals to 5,000psi, chart test.
89. Nipple down BOPE.
90. Install tubing head adapter assembly and tree. Pressure-test same to 5,000psi, chart test. Remove BPV.
performy,
an open hole sidetrack within the Kuparuk C.
(LMWD Program: GR/RES/NEU/DEN/DIR)
Planned KOP 23,875' MD. SFD 3/24/2023
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 11 of 21 Printed: 24-Mar-23
91. Test tubing and tubing-casing annulus separately to 3,500psi / 30 mins, chart tests.
92. Shear circulation valve in GLM. Circulate tubing to diesel & freeze-protect annulus.
93. Set BPV and secure well. RDMO Doyon 26.
94. POST RIG – Ops
a. Pressure-up to convert flotation barrier disk & unload well.
14. Discussion of Mud and Cuttings Disposal and Annular Disposal
(Requirements of 20 AAC 25.005 (c)(14))
Incidental fluids developed from CD2-361 drilling operations will be hauled to the Alpine Grind & Inject
Facility and injected into the dedicated Class 1 disposal well CD1-01A on CD1 Pad.
Because of the 17” Intermediate 1 Liner Hanger blocking the 20” Surface Casing Shoe, CD2-361 is not a
candidate for future annular disposal.
15. Attachments
Attachment 1 Cement Summary
Attachment 2 Drilling Hazards Summary
Attachment 3 Completion Schematic
Attachment 4 Directional Plan
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 12 of 21 Printed: 24-Mar-23
Attachment 1 – Cement Summary
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 13 of 21 Printed: 24-Mar-23
20” Surface Casing to 2,478’ MD / 2,411’ TVD
Cement from 2,478’ to 1,978' MD (500’) with 15.8ppg Class G tail and from 1,978' to surface with
11.0ppg DeepCRETE lead. Assume 250% excess annular volume in Permafrost, 50% excess below
the Permafrost, and no excess within the 30” conductor.
Lead Slurry from 1,978’ MD to Surface with 11.0ppg DeepCRETE
Conductor (135’ – 55’) X 2.0625 ft3/ft X 1.0 (0% excess) = 165 ft3
Permafrost to Conductor (1,308’ – 135’) X 0.9599 ft3/ft X 3.5 (250% excess) = 3,942 ft3
Top of Tail to Permafrost (1,978’ – 1,308’) X 0.9599 ft3/ft X 1.5 (50% excess) = 965 ft3
Total Volume = 165 + 3,942 + 965 = 5,072 ft3 => 2,655 sx of 11.0ppg DeepCRETE @ 1.91 ft3 /sk
Tail Slurry from 2,478’ MD to 1,978’ MD with 15.8ppg Class G + additives
Shoe to Top of Tail (2,478’ – 1,978) X 0.9599 ft3/ft X 1.50 (50% excess) = 720 ft3
Shoe Joints (130’) X 1.9134 ft3/ft X 1.00 (0% excess) = 249 ft3
Total Volume = 720 + 249 = 969 ft3 => 836 sx of 15.8ppg Class G + additives @ 1.16 ft3/sk
17” Intermediate 1 Liner to 6,404’ MD / 4,407’ TVD
Cement from 6,404’ to 5,904’ MD (500’) with 15.8ppg Class G tail and from 5,904’ to 500’ MD above
the top of the C10 with 11.0ppg Extended Class G lead assuming 20% excess annular volume.
Lead Slurry from 5,904’ MD to 2,700’ MD with 11.0ppg Extended Class G + additives
Top of Tail to 500’ MD Above
C10 Top at 3,200’ MD (5,904’ – 2,700’) X 0.6054 ft3/ft X 1.20 (20% excess) = 2,328 ft3
Total Volume = 2,328 ft3 => 1,219 sx of 11.0ppg Extended Class G + additives @ 1.91 ft3/sk
Tail Slurry from 6,404’ MD to 5,904’ MD with 15.8ppg Class G + additives
Shoe to Top of Tail (6,404’ – 5,904’) X 0.6054 ft3/ft X 1.20 (20% excess) = 363 ft3
Shoe Joints (131’) X 1.3963 ft3/ft X 1.00 (0% excess) = 183 ft3
Total Volume = 363 + 183 = 546 ft3 => 471 sx of 15.8ppg Class G + additives @ 1.16 ft3/sk
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 14 of 21 Printed: 24-Mar-23
13-5/8” Intermediate 2 Casing to 12,599’ MD / 5,681’ TVD
Cement from 12,599’ to 250’ TVD above liner shoe with 15.8ppg Class G assuming 30% excess
annular volume.
Cement from 12,599’ MD to 11,398’ MD with 15.8ppg Class G + additives
Shoe to Top of Cement (12,599’ – 11,398’) X 0.6578 ft3/ft X 1.30 (30% excess) = 1,027 ft3
Shoe Joint (207’) X 0.8353 ft3/ft X 1.00 (0% excess) = 173 ft3
Total Volume = 1,027 + 173 = 1,200 ft3 => 1,034 sx of 15.8ppg Class G + additives @ 1.16 ft3/sk
9-7/8” Intermediate 3 Liner to 18,468’ MD / 6,896’ TVD
Cement from 18,468’ to 250’ TVD above the shoe with 15.8ppg Class G assuming 30% excess
annular volume.
Cement from 18,468’ MD to 17,260’ MD with 15.8ppg Class G + additives
Shoe to Top of Cement (18,468’ – 17,260’) X 0.4622 ft3/ft X 1.30 (30% excess) = 725 ft3
Shoe Joint (167’) X 0.4057 ft3/ft X 1.00 (0% excess) = 68 ft3
Total Volume = 725 + 68 = 794 ft3 => 684 sx of 15.8ppg Class G + additives @ 1.16 ft3/sk
7-5/8” Intermediate 4 Liner to 20,445’ MD / 7,134’ TVD
*Due to high angle and short open hole section the required 250’ TVD TOC is above our liner hanger
and in the shoe of the 9 7/8” casing. This is a high risk as our liner hanger is set against the plugs. If
the plugs don’t bump we have to wait on cement.
Intrm 4 is a drilling liner. A cement Intrm 3 shoe and Intrm 4 packer test provide isolation of the
formation.
COP request to use the 1,000’MD (ࡱ 2/3 open hole volume).
Cement from 20,445’ MD to 19,445’ MD with 15.8ppg Class G + additives
Shoe to Top of Cement (20,445’ – 19,445’) X 0.2559 ft3/ft X 1.15 (15% excess) = 295 ft3
Shoe Joint (167’) X 0.2578 ft3/ft X 1.00 (0% excess) = 44 ft3
Total Volume = 295 + 68 = 339 ft3 => 293 sx of 15.8ppg Class G + additives @ 1.16 ft3/sk
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 15 of 21 Printed: 24-Mar-23
Attachment 2 – Drilling Hazards Summary
(To be posted in Rig Floor Doghouse Prior to Spud)
24" Hole / 20” Casing Interval
Event Risk Level Mitigation Strategy
Conductor Broach Low Monitor cellar continuously during interval.
Well Collision High
Closely monitor traveling cylinder, update as
needed. Utilize gyro equipment as needed to verify
wellbore location. Closely follow CPAI Anti-
Collision policies. Shut-in offset wells as required.
Rig-up diverter for collision risk mitigation.
Gas Hydrates Low
Diverter drills and if observed – control drill, reduce
pump rates and circulating time, reduce mud
temperatures. Shallow hazard study noted minimal
risk on CD2 pad.
Abnormal Pressure in
Surface Formations Low Diverter drills, increased mud weight. Shallow
hazard study noted minimal risk on CD2 pad.
Abnormal Pressure in C-
30 (CD2 Annular Injection) Low
Top-set C-30 formation. No annular injection
performed on pad since 2012 nor abnormal
pressure encountered in C-30 on CD2-162 (2019).
Clay Balling High
Maintain planned mud parameters and flow rates.
Use proactive anti-balling sweeps and mud
product additions.
Lost Circulation Low
Reduce pump rates, mud rheology, add lost
circulation material, & control pipe running speeds.
17-1/2” x 20” Hole / 17” Liner Interval
Event Risk Level Mitigation Strategy
Lost Circulation Medium
Reduce pump rates, reduce trip speeds, monitor
real time ECDs, adjust mud rheology, and add lost
circulation material as needed.
Abnormal Pressure in
Qannik High
Employ Qannik Pressure Management Plan.
Perform well control drills, flow check as needed,
MPD fingerprint if possible, increase mud weight.
Abnormal Pressure in
Overburden Formations Low Perform well control drills, check for flow during
connections, and increase mud weight as needed.
Hole Cleaning Low
Monitor ECD and torque/drag trends, control drill
and use best hole cleaning practices, and
backream to clean hole prior to liner run.
Swabbing on Trips Medium
Reduce trip speeds, condition mud properties,
monitor hole fill, pump out of hole, monitor real time
ECDs, and use MPD if possible.
Differential Sticking Medium
Monitor for seepage losses, monitor static T&D
forces, run LCM as needed, and employ proper
centralization to provide semi-flush liner stand-off.
Qannik Cement Isolation Medium
Centralize for > 70% Stand-Off, use Lead / Tail
slurry design to reduce ECDs, create mud / spacer
/ slurry train to allow effective displacement, and be
prepared for liner top squeeze contingency.
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 16 of 21 Printed: 24-Mar-23
14-3/4” x 17-1/2” Hole / 13-5/8” Liner Interval
Event Risk Level Mitigation Strategy
Hole Cleaning Low
Monitor ECD and torque/drag trends, control drill,
use best hole cleaning practices, and backream to
clean hole prior to liner run.
BHA Failure Medium Proactively plan BHA trip to allow for tool wear
evaluation and monitor shock and vibration.
Lost Circulation Medium
Reduce pump rates, reduce trip speeds, real time
ECD monitoring, mud rheology, add lost circulation
material as needed.
Casing Wear Medium Model previous liner casing wear, have NRDPPs
available, & use CPAI casing wear best practices.
Stuck Pipe Medium
Use good drilling practices, monitor T&D trends,
run BHA disconnect sub if necessary, have fishing
kit pre-identified.
Differential Sticking Medium
Monitor for seepage losses, run LCM as needed,
monitor static T&D forces, centralize liner as
needed to prevent differential sticking.
Floated Liner Run High
Employ CD2-162 and CD2-310 Lessons Learned,
implement flotation-specific well control drills, & use
floated liner decision tree for issues encountered.
12-1/4” x 13-1/2” Hole / 9-7/8” Liner Interval
Event Risk Level Mitigation Strategy
Hole Cleaning Low
Monitor ECD and torque/drag trends, control drill,
use best hole cleaning practices, and backream to
clean hole prior to liner run.
BHA Failure Medium Proactively plan BHA trip to allow for tool wear
evaluation and monitor shock and vibration.
Lost Circulation Medium
Reduce pump rates, reduce trip speeds, real time
ECD monitoring, mud rheology, add lost circulation
material as needed.
Casing Wear Medium Model previous liner casing wear, have NRDPPs
available, & use CPAI casing wear best practices.
Stuck Pipe Medium
Use good drilling practices, monitor T&D trends,
run BHA disconnect sub if necessary, have fishing
kit pre-identified.
Differential Sticking Medium
Monitor for seepage losses, run LCM as needed,
monitor static T&D forces, centralize liner as
needed to prevent differential sticking.
Floated Liner Run High
Employ CD2-162 and CD2-310 Lessons Learned,
implement flotation-specific well control drills, & use
floated liner decision tree for issues encountered.
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 17 of 21 Printed: 24-Mar-23
8-1/2” x 10-1/4” Hole / 9-7/8” Liner Interval
Event Risk Level Mitigation Strategy
Wellbore Instability High
Isolated instable shales with dedicated hole
section, employ CD2-162 and CD2-310 instability
mitigations (underreamer, proper EMW to prevent
shear failure, MPD, & inhibited fluid), monitor real-
time drilling data. Use CPAI Lower Shale instability
mitigation drilling best practices.
Lost Circulation High
Reduce pump rates, reduce trip speeds, real time
ECD monitoring, mud rheology, add lost circulation
material as needed. Use MPD to reduce ECDs.
Abnormal Reservoir
Pressure High
Well control drills, flow check during connections,
use MPD to fingerprint / provide dynamic
overbalance, increase mud weight as needed to
maintain overbalance during tripping activities.
Landing in Thin Kuparuk C High
Use CD2-162 and CD2-310 data to reduce depth
uncertainty. Use Ultra-Deep Azimuthal Resistivity
to identify Kuparuk C and assist with adjusting
landing.
Swabbing on Trips Medium
Reduce trip speeds, condition mud properties,
proper hole filling, pump out of hole, real time ECD
monitoring, & use MPD if possible.
Cement around liner
hanger from 250’TVD
regualtion
High
Due to high angle and short open hole section the
required 250’ TVD TOC is above our liner hanger
and in the shoe of the 9 7/8” casing. This is a high
risk as our liner hanger is set against the plugs. If
the plugs don’t bump, we have to wait on cement.
Reduce cement column to 1,000’MD or 2/3 of the
open hole volume.
Barite Sag High Use ultra-fine barite to reduce sag risk. Employ
barite sag mitigation best practices.
6-3/4” Hole / 4-1/2” Pre-Perforated Liner Interval
Event Risk Level Mitigation Strategy
Lost Circulation Medium
Reduce pump rates, reduce trip speeds, real time
ECD monitoring, mud rheology, add lost circulation
material as needed. Use MPD to reduce ECDs.
Abnormal Reservoir
Pressure High
Well control drills, flow check during connections,
use MPD to fingerprint / provide dynamic
overbalance, increase mud weight as needed to
maintain overbalance during tripping activities.
Staying in Kuparuk C High
Use geosteering best practices from offset Nanuq
Kuparuk C, use Deep Reading Azimuthal
Resistivity tool to assist with reservoir
interpretation, and create decision tree responding
to for reservoir excursions.
Wellbore Instability High
Employ CD2-162 and CD2-310 instability
mitigations (underreamer, proper EMW to prevent
shear failure, MPD, & inhibited fluid), monitor real-
time drilling data. Use CPAI Lower Shale instability
mitigation drilling best practices.
Barite Sag High Use weighted kill-weight brine for tripping
operations.
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 18 of 21 Printed: 24-Mar-23
Swabbing on Trips Medium
Reduce trip speeds, use weighted kill-weight brine
to reduce swab pressure, monitor trip tanks, & use
MPD if possible.
Well Proximity Risks:
CD2-361 will be the seventy-seventh (78th) well drilled on the pad. Directional drilling / collision avoidance
information as required by 20 ACC 25.050 (b) is provided in the following attachments.
Drilling Area Risks:
Qannik & Kuparuk C Reservoir Pressure: Offset injection has the potential to increase the reservoir
pressure. Heightened awareness and good well control practices will be used to prevent a well control
scenario. If a well control scenario is encountered, well control drills will be used to reduce shut-in times
and enough kill-weight material will be on location to kill the well as required.
Weak Overburden Sand Stringers – Clean sand stringers from slope deposits were intermittently
deposited on the slope shelves of the Torok and Albian. These clean sands have reduced fracture
gradients relative to the silts and clays that make up most of the overburden. LCM material will be
available to mitigate losses in the intermediate sections.
Lower Shale Stability: The HRZ and Kalubik in the Intermediate #4 hole section will require higher mud
weights than historically used to enhance wellbore stability. Managed Pressure Drilling will be used in
conjunction with a 6-string casing design to mitigate HRZ & Kalubik shale instability. LCM material and
well bore strengthening pills are expected to be effective in dealing with lost circulation as required to
maintain sufficient overbalance for wellbore instability mitigation.
For all sections, good tripping practices will be stressed to minimize the potential of taking swabbed kicks.
Kuparuk C Reservoir Pressure:
AOGCC Application for Permit to Drill, Well CRU CD2-361 Saved: 24-Mar-23 CRU CD2-361 AOGCC APD Page 19 of 21 Printed: 24-Mar-23 Attachment 3 –Completion Schematic
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 20 of 21 Printed: 24-Mar-23
Attachment 4 – Property Plat
AOGCC Application for Permit to Drill, Well CRU CD2-361
Saved: 24-Mar-23
CRU CD2-361 AOGCC APD
Page 21 of 21 Printed: 24-Mar-23
Attachment 5 – Directional Plan CD2-361
CD2-361 wp08 (ST)
23819 23850
23850 24000
24000 24200
24200 24400
CD2-361 wp08 (ST)Plan Summary
0
3
Dogleg Severity24000 26000 28000 30000 32000 34000
Measured Depth
4-1/2" Production Liner
60.0
60.0
120.0
120.0
0
90
180
270
30
210
60
240 120
300
150
330
Travelling Cylinder Azimuth (TFO+AZI) [°] vs Travelling Cylinder Separation [120 usft/in]
2385023900239502399924047
24094
24140
24184
24228
24269
24312CD2-361PB1
6000
6750
True Vertical Depth16000 18000 20000 22000 24000 26000 28000 30000
Vertical Section at 331.26°
7-5/8" Intermediate Casing 4-1/2" Production Liner
0
18
35
Centre to Centre Separation23800 23900 24000 24100 24200 24300 24400 24500
Measured Depth
Equivalent Magnetic Distance
DDI
7.860
SURVEY PROGRAM
Date: 2022-11-07T00:00:00 Validated: Yes Version:
Depth From Depth To Survey/Plan Tool
131.79 1294.54 CD2-361 Srvy 1 SDI_URSA1_I4
1356.61 2399.41 CD2-361 Srvy 2 MWD+IFR2+SAG+MS
2497.48 2497.48 CD2-361 Srvy 3 INC+TREND
2563.25 6358.44 CD2-361 Srvy 4 MWD+IFR2+SAG+MS
6425.05 6425.05 CD2-361 Srvy 5 INC+TREND
6517.38 12536.73 CD2-361 Srvy 6 MWD+IFR2+SAG+MS
12631.24 18362.63 CD2-361 Srvy 7 MWD+IFR2+SAG+MS
18461.52 18461.52 CD2-361 Srvy 8 INC+TREND
18497.67 20357.16 CD2-361 Srvy 9 MWD+IFR2+SAG+MS
20438.01 20438.01 CD2-361 Srvy 10 INC+TREND
20510.19 22086.32 CD2-361 Srvy 11 MWD+IFR2+SAG+MS
22147.43 23819.20 CD2-361 Srvy 12 MWD+IFR2+SAG+MS
23819.20 35306.33 CD2-361 wp08 (ST) (CD2-361) MWD+IFR2+SAG+MS
Ground /15.50
CASING DETAILS
TVD MD Name
7197.65 35306.33 4-1/2" Production Liner
Mag Model & Date: BGGM2022 19-Jan-23
Magnetic North is 14.53° East of True North (Magnetic Declinatio
Mag Dip & Field Strength: 80.60° 57177.19nT
SECTION DETAILS
Sec MD Inc Azi TVD +N/-S +E/-W Dleg TFace VSect Target Annotation
1 23819.20 89.98 314.21 7180.37 18524.69 -7775.40 0.00 0.0019981.46 Start DLS 3.86 TFO 81.72
2 23875.00 90.29 316.34 7180.24 18564.34 -7814.67 3.86 81.72 20035.10 Start DLS 3.00 TFO -90.35
325410.11 89.95 270.29 7176.90 19155.66 -9186.79 3.00 -90.35 21213.29 Start 204.33 hold at 25410.11 MD
4 25614.44 89.95 270.29 7177.09 19156.68 -9391.12 0.00 0.00 21312.42 Start DLS 3.00 TFO 90.08
5 27538.18 89.90 328.00 7179.92 20054.44 -11001.17 3.00 90.0822873.71 CD2-361 Tgt 01 032323 Start DLS 3.00 TFO 90.54
627648.81 89.87 331.32 7180.14 20149.91 -11057.05 3.00 90.54 22984.28 Start 7657.52 hold at 27648.81 MD
7 35306.33 89.87 331.32 7197.65 26867.86 -14732.16 0.00 0.00 30641.78 CD2-361 Tgt 02 032323 TD at 35306.33
FORMATION TOP DETAILS
No formation data is available
By signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured it's completeness, and all surroundingwells are assigned to the proper position, and I approve the scan and collision avoidance plan as set out in the audit pack.I approve it as the basiis
for the final well plan and wellsite drawings. I also acknowledge that unless notified otherwise all targets have a 100 feet lateral tolerance.
Prepared by Checked by Accepted by Approved by
CD2-361 actual @ 70.03usft (D26)
20004000600080001000012000True Vertical Depth16000 18000 20000 22000 24000 26000 28000 30000Vertical Section at 331.26°CD2-361PB17-5/8" Intermediate Casing4-1/2" Production Liner2000021000 220002300024000
25000 260002700028000290003000031000320003300034000350003530690°90°90°CD2-361wp08(ST)CD2-361 wp08 (ST)18:52, March 23 2023Section View
160001800020000220002400026000South(-)/ orth( )-18000 -16000 -14000 -12000 -10000 -8000 -6000 -4000 -2000est(-)/ ast( )CD2-361 Tgt 02 032323CD2-361 Tgt 01 032323CD2-361PB17-5/8" Intermediate Casing4-1/2" Production LinerCD2-361wp08(ST)CD2-361 wp08 (ST)While drilling production section, stay within 100 feet laterally of plan, unless notified otherwise.18:56, March 23 20233ODQ9LHZ
(QQSQX
&rmuQp
=yreXT
AcX
IXjj
IXjjSrxX
(Xc_p
*)C"iRfR>wsV
'sqsUs>adiidv"iRfRhqUPLB
MYwq8s|aBisvY
':"ivdqY>RV
')
')
')vBC
4rTQj&r
ryWcpQX?XZXyXpTX
DG(?X\XxXpTX
6(?X\XxXpTX
9r}b?XZX{pTX
A xX&QjT jQcrp6XbrW
Mii')
')RURi!])
')RURi!])
CwY
7dqdnn'RwY
=xreXTMYwq8s|aBisvY
8s|aBisvY"iRfR
EqdYVBRY
6QuAXm
.Xr(Q m
6QuNrpX
AcX
AcX=rccrp
,xrm
=rccrpFpTX}Qcp
IXjj
IXjj=rccrp
':"ivdqY>RV
7Rv
')
9
A
+
I
]
]
AXm(Q m 7YRqBYR5YYi
Edq`Mii@Y[YwYqUY>sdq
Edq``YsVYdUURiY[RUsw
=rccrpFpTX}Qcpttt].xr pW4XXj ]
IXjjSr{
6Q_pXcT
(Xc_p
# Wc9rX
Hzcrp
GX}cTQjAXTcrp
')
6rWXj9QmXAQmujX(QX
$//7
')vBC
=bQX
(Xub,yrm1DG(
k ^
=jQpA ~XDrrj=xr_xQm(QX
(Xub,xrm
^l
=jQpAXTcrp
6XQ yXW
(XubDr
^lA xX1IXjjSrxXl
')vBC')
GX}cTQj
(Xub3pTjcpQcrp#cm b(Xub9
^l
^l ^
(XTjcpQcrp
(cu#p_jX
,cXjWAyXp_b
kpD0
>5"8
9
k ^
DcX;p(Xub
+
I
^
Drrj9QmX
7K 2-@ B"/ 7B
?XmQxg
<JB/7K 2-@ BR`
(r_jX_ % cjW
+
I?QX ?QX
^k ^lk ^
D o
(cxXTcrp
?QXD,;
k ^lDQx_X
')C`
')C`
";"#":&C !>>/%7-%>42'>2$".C226%,1";&C&'&6&1$&C #//>
>
2/4"1?C 212&2+,//,37>/%7-%>.1&$" > C&(&5&1$&C
>%&89%/> 97)>
>
62-&$;C #78(41>26+> /23(>C&(&5&1$&C
>%&89%/> 97)>
>
,;&C
>/3,1(>%'>28+C&'&71$&C !49(>
!&..C
>=5>&?C".$=.";,21C&;+2%C ,1,090>94:%894(>
!&..#25&C
>
&:,*1C
>;3> !>
."11&%C=9&?C
&":=5&%C
&4;+C 1$.,1";,21C @,/=;+C
=:)C
> >
>
> >
>
> >
>
> >
>
> >
>
> >
>
> >
>
> >
>
> >
>
> >
>
> >
>
> >
>
> >
>
> >
>
> >
>
> >
>
> >
>
> >
>
> >
>
> >
>
> >
>
C";C
C C52%=$;,21C,1&5C
&:,*1C"6*&;:C
"6*&;C"/&C
+,</,::C;"6*&;C
+"4&C
,4C1*.&C
AC
,4C,5C
&8,$".C
&4;+C
=:)C
C
=:)C
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
C
=:)C
C
=:)C
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
!C
=:)C
!C
=:)C
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
&8,$".C 2*.&*C
&$;,21C ";&C
=:)C
C=:)C
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
=,.%C =0C
";&C ";&C
B
33=:)C C=:)C
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
> >
>!*8>>
> > >
>
> >
3/%1>+,87>8%4*(8>&(18(4>
,4&/(>4%',97> >
>!*8>
>
>
3/%1>+,87>8%4*(8>&(18(4>
,4&/(>4%',97> >
":,1*C2,1;:C
&":=5&%C
&4;+C
=:)C
>
>
>
>
>
>
>
> > >
>
>
&8,$".C
&4;+C
=:)C "/&C
>>
>
> 95%&(>%7,1*>
>>18(40(',%8(>%7,1*>
>
>18(40(',%8(>%7,1*>
>
>18(40(',%8(>%7,1*>
>
>18(40(',%8(>%7,1*>
>>
>42'9&8,21>,1(4>
":,1*C 2.&C
,"/&;&5C ,"/&;&5C
,1C ,1C
> >
>
>
>
>
> >
> >
>
>
> >
""""""
"
"
"
"!
""
7[=d i hOMSBDYi,U]Ki0YUgMRMahi4?=SiUSi cYYDSai4c^Dhi!=a=i,U]Ki2DFD\DS?Di2DFDYDS?Di!D_MJSi -iOWMSDi0=Bii !ii !ii !ieW.5i47i!=acRi(DMJKai !i=?ac=Oii Pc_Ii!i4?=Si2=SJDi iaUi ic_I i+D=_cYDBi!DWaK i4?=Si2=BMc_iM_i:SOMRMaDBi i OD=Y=S?Di%=?aUYi?caUHiM_i:SOMRMaDB i +=gi#OOMW_Di4DW=Y=aMUSiM_i ic_Ii'EVCEbN@i6@>QEi&>AVZiXXQNECi;D[_MUSi i cMOBi4?=Si9WDi'*/*i&)*8$3i11*)$"iQQifEQQX>bL`ifNbLNTi
i
iVGiZEGEZET@Ei4?=Si9WDi
i
0
30
60
Centre to Centre Separation23880 23940 24000 24060 24120 24180
Partial Measured Depth CD2-361PB1CD2-361 wp08 (ST)e View
0
150
300
Centre to Centre Separation24000 26000 28000 30000 32000 34000
Measured DepthCD2-361PB1SV P M
Depth rom Depth To Sur e /Plan Tool
131.79 1294.54 CD2-361 Sr 1 SDI S 1 I4
1356.61 2399.41 CD2-361 Sr 2 M D I 2 S MS
2497.48 2497.48 CD2-361 Sr 3 I C T D
2563.25 6358.44 CD2-361 Sr 4 M D I 2 S MS
6425.05 6425.05 CD2-361 Sr 5 I C T D
6517.3812536.73 CD2-361 Sr 6 M D I 2 S MS
12631.2418362.63 CD2-361 Sr 7 M D I 2 S MS
18461.5218461.52 CD2-361 Sr 8 I C T D
18497.67 20357.16 CD2-361 Sr 9 M D I 2 S MS
20438.0120438.01 CD2-361 Sr 10 I C T D
20510.1922086.32 CD2-361 Sr 11 MDI 2S MS
22147.43 23819.20 CD2-361 Sr 12 M D I 2 S MS
23819.2035306.33 CD2-361 wp08 (ST) (CD2-361) M D I 2 S MS
1 20 c 23 2023
C SI D T ILS
TVD MD ame
35306.33 4-1/2" Production Liner
23819 23850
23850 24000
24000 24200
24200 24400
CD2-361 wp08 (ST)TC View
30
30
60
60
90
90
120
120
150
150
0
90
180
270
30
210
60
240 120
300
150
330
Tra elling C linder imuth (T I) ° s Tra elling C linder Separation 60 us t/in
23850239002395023999
24047
24094
24140
24184
24228
24269
24312
24353
CD2-361PB1
SV P M
Date: 2022-11-07T00:00:00 Validated: es Version:
rom To Tool
131.79 1294.54 SDI S 1 I4
1356.61 2399.41 M D I 2 S MS
2497.48 2497.48 ICT D
2563.25 6358.44 M D I 2 S MS
6425.05 6425.05 I C T D
6517.38 12536.73 M D I 2 S MS
12631.24 18362.63 M D I 2 S MS
18461.52 18461.52 I C T D
18497.67 20357.16 M D I 2 S MS
20438.01 20438.01 I C T D
20510.19 22086.32 M D I 2 S MS
22147.43 23819.20 M D I 2 S MS
23819.20 35306.33 M D I 2 S MS
CSI DTILS
TVD MD ame
35306.33 4-1/2" Production Liner
S CTI D T ILS
Sec MD Inc i TVD /-S /- Dleg T ace VSect Target nnotation
1 23819.20 89.98 314.21 7180.37 18524.69 -7775.40 0.00 0.0019981.46 Start DLS 3.86 T 81.72
2 23875.00 90.29 316.34 7180.24 18564.34 -7814.67 3.86 81.72 20035.10 Start DLS 3.00 T -90.35
325410.11 89.95 270.29 7176.90 19155.66 -9186.79 3.00 -90.35 21213.29 Start 204.33 hold at 25410.11 MD
4 25614.44 89.95 270.29 7177.09 19156.68 -9391.12 0.00 0.0021312.42 Start DLS 3.00 T 90.08
5 27538.18 89.90 328.00 7179.92 20054.44 -11001.17 3.00 90.0822873.71 CD2-361 Tgt 01 032323 Start DLS 3.00 T 90.54
627648.81 89.87 331.32 7180.14 20149.91 -11057.05 3.00 90.54 22984.28 Start 7657.52 hold at 27648.81 MD
7 35306.33 89.87 331.32 7197.65 26867.86 -14732.16 0.00 0.00 30641.78 CD2-361 Tgt 02 032323 TD at 35306.33
CD2-361 wp08 (ST)Spi e ot1 33 c 23 20232381 20 To 3 306 33orthing (3000 us t/in)asting (3000 us t/in)707171CD2-162PB170717 172727373747475757676777778
Temptation1707171727273737474757576Temptation1CD2-03CD2-06707171727273CD2-31070CD2-310PB370717172CD2-361PB1CD2-466CD2-468707171CD2-320wp13CD2-358wp06.17071hea170717172727373747475757676777778787979igli170igli1
707171727273737474757576767777Iapetus27071717272737374747575767677Char170717172CD2-361wp08(ST)
&lhoMj!
:tlcTP{!
>a{T!
FTgg!
FTggOlqT!
(Tya]j!
:qlcTP{
3Mo>y{Th!
.Tl(M{~h!
3MoJljT!
>a{T
>a{T:lya{alj!
,qlh!
:lya{aljDjPTwMaj{!
FTgg
FTgg:lya{alj
:lya{aljDjPTwMaj{
.qaS&ljTq]TjPT!
FTggOltT
3M]jT{aPy
(Tya]j
$~Sa{6l{Ty!
ETsyalj!
ETwaPMg>TP{alj!
>~xTBlg:ql]sMh
,tlh
~y\
'mkmQm;_bffbpz#fNzdNekQLG5?
Iz|Urk5mv_?fmpU
'7#fpbkU;NR
')
')
')p?@
1lPMg&lltSajM{T<TVTtTjPT!
AE(<TXTqTjPT!
3(<TVTqTjPT!
6lw`<TVTtTjPT!
>~xT&MgP~gM{alj3T{`lS!
8~{o~{TqqlsyMqTM{
(M{MOMyT!
Iz|Urk5mv_?fmpU5mv_?fmpU#fNzdNCkb|UR?|N|Uz
>y{Th(M{~h!
'7#fpbkU;NR
Iff')
')NQ|Nf"z[
')NQ|Nf"z[
@rU
4bkbii'rN|u
zb^iN
*)@#fNzdN;rmR
4UNk?UN2UUf
Czbk^Iff=UWUrUkQU;mbk|
Czbk^^UmRU|bQzQNfUYQ|mr
4Np
')
6>
+F
')
nnn z[
nnnz[
z[
nnnz[
.ql~jS1TTg! z[
3lSTg6MhT>MhogT(M{T(TPgajM{alj
(ao$j]gT
,aTgS>{tTj]{`
jA
%//4
')p?@
:`MyT!;2#5
(To{`,tlhAE(
~y\
6
~y\
Al
~y\
(M{T
>~xTFTggOlqT
')?r ?)0CrzN');%
')?r ?2%4G)/4#/'7
')?r ?2%4G)ekQLmkf LZffU
')?r ?2%4G)/4#/'7
')?r ?2%4G)ekQLmkf LWbffU
')?r ?2%4G)/4#/'7
')?r ?2%4G)/4#/'7
')?r ?2%4G)ekQLmkf LWbffU
')?r ?2%4G)/4#/'7
')?r ?2%4G)ekQLmkf LZf
')?r ?2%4G)/4#/')
')?r ?2%4G)/4#/')
')p?@')
AaT8j(To{`!
+F
~y\
Blg6MhT
?)0LC=?#L0
4G)0-=?#/4?
05'@=*5)
4G)0-=?#/4?
05'@=*5)
4G)0-=?#/4?
4G)0-=?#/4?
05'@=*5)
4G)0-=?#/4?
05'@=*5)
4G)0-=?#/4?
4G)0-=?#/4?
4G)0-=?#/4?
(TyPqao{alj
(aqTP{alj
?)0C=?#^rm4G)0?'H#=U
9H/4G)0-=?N^4f|b?|N|bmk'mrrUQ|bmk
0kQfbkmiU|Ur dkmkNb|rUkR
9G?/4G)0-=?N^4f|b?}N|bmk'mrrUQ|bmk
0kQfbkmiU|Ur dkmkNb|rUkR
9G?/4G)0-=?N^4f|b?|N|bmk'mrrUQ|bmk
9G?/4G)0-=?N^4f|b?|N|bmk'mrrUQ|bmk
0kQfbkmiU|Ur dkmkNb|rUkR
9H/4G)0-=?N^4f|b?|N|bmk'mrrUQ|bmk
0kQfbkmiU|Ur dkmkNb|rUkR
9H/4G)0-=?N^4f|b?|N|bmk'mrrUQ|bmk
9H/4G)0-=?N^4f|b?|N|bmk'mrrUQ|bmk
9H/4G)0-=?N^4f|b?|N|bmk'mrrUQ|bmk
*(+)5
6
-*&1
6
323'3,-00-49?0&9.&?/2'%#!?
$9:)52?38,?!034)?
*'6**-%)16 -)
6
6!,)
6
%1
6
?04-2)?&(?
''
6
?
''*,
6
?
0%#)
6
?>4
?!"?
*0%1%*)63)/%)156)6%061603,456011%*)6
6 ,)
6
*/$6 -)
6
3,456'3'1%*)61$*
6
31+316,,*.06,616
10
6
#& ( %( &%( "( #( %!( '"(
%&(
%( %(( #( ( #( ( #((#(
&#(&#(&#( &#(&#( &#( &#(&#(&#(
0%#)6-#106
-#16(6
$%2(%0061-#16
%+6)#'6
%+6
%,6
6 6 6
$+6 30"6 30"6 30"6
?"+:?
?
?
?
?
?
?
?
40&2?,-:9?:&5+):?')2:)5?
-5'0)?5&(-<9?
?
?"+:?
? ?
?
?
?
?
?
40&2?,-:9?:&5+):?')2:)5?
-5'0)?5&(-<9?
?
?"+;?
?
?
?
? ?
?
?
40&2?,-:9?:&5+):?')2:)5?
-5'0)?5&(-<9?
?
?"+:?
? ?
?
? ?
?
?
40&2?,-:9?:&5+):?')2:)5?
-5'0)?5&(-<9?
?
0%)#6*%)106
03-6 /%'6
+1$6
+1$6
30"6 30"6 (6
??
?
?
?
?!<7&')?&9-2+?
?
??2:)51)(-&:)?&9-2+?
? ? ?2:)51)(-&:)?&9-2+?
? ? ?2:)51)(-&:)?&9-2+?
?? ?2:)51)(-&:)?&9-2+?
? ??
?53(<':-32?-2)5?
$00?
?
?&':<&0?
<9*?
?
?&':<&0?
<9*?
?
"5<)?
-2-1<1?<5=&:<6)?
?9-+1&?
"??0&9.&?53(?
( $(
((
(
&#(&#(
0%)#6 *'6
%(1,6
%(1,6
%)6 %)6
?
?
?
?
?
?
?
?
?
?
?
?
?
?
CD2-361 wp08 (ST)CD2-162PB1Temptation 1Temptation 1CD2-310PB3CD2-361PB1CD2-320 wp13Char 13-D ViewCD2-361 wp08 (ST)19:42, March 23 2023
CD2-361 wp08 (ST)CD2-162PB1Temptation 1Temptation 1CD2-03CD2-03L1CD2-21CD2-21PB1CD2-310PB3CD2-361PB1Char 13-D ViewCD2-361 wp08 (ST)19:43, March 23 2023
150001750020000225002500027500South(-)/ orth( ) (2500 us t/in)-22500 -20000 -17500 -15000 -12500 -10000 -7500 -5000 -2500e t(-) t( ) (2 00 t in)00011111CD2-16210001111122222333336666688
T e p t t i o n100011111222223333366Tepttion1
0001111122222CD2-31000CD2-31030001111122CD2-3611CD2-660111CD2-320wp130001111122222333336666688888 ii1ii1
00011111222223333366666pet200011111222223333366666C10001111122CD2-361wp08(ST)CD2-361 wp08 (ST)te i e View1 c 23 2023LLB T T D T ILS (M P C - DI T S)ame TVD ShapeCD2-361 Tgt 01 032323 7179.92 Circle ( adius: 100.00)CD2-361 Tgt 02 032323 7197.65 Circle ( adius: 100.00)CD2-361 Tgt 01 M 7179.92 Circle ( adius: 1320.00)CD2-361 Tgt 02 M 7197.65 Circle ( adius: 1320.00)
CD2-361 (ST)wp08 Surface Location
CD2-361 (ST)wp08 Surface Location
#SchlumbergerͲConfidential
CD2-361 (ST)wp08 KOP for ST
CD2-361 (ST)wp08 KOP for ST
#SchlumbergerͲConfidential
CD2-361 (ST)wp08 TD
CD2-361 (ST)wp08 TD
#SchlumbergerͲConfidential
$/3,1(
)$&,/,7<352-(&7'5,//
6,7(&'
&'
W,KE͗ϵϬϳͲϲϳϬͲϰϳϯϵ
W,KE͗ϵϬϳͲϲϳϬͲϰϳϯϵ
NAD 83
W,KE͗ϵϬϳͲϲϳϬͲϰϳϯϵ
)67+72($7
$/$$
.
6
80,$4'HVLJQ 0XQLFLSDO
6HUYLFHV//&$(&/
Revised 7/2022
TRANSMITTAL LETTER CHECKLIST
WELL NAME:______________________________________
PTD:_____________________________________________
___ Development ___ Service ___ Exploratory ___ Stratigraphic Test ___ Non-Conventional
FIELD:__________________________POOL:____________________________________
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK OPTIONS TEXT FOR APPROVAL LETTER
MULTI
LATERAL
(If last two digits
in API number are
between 60-69)
The permit is for a new wellbore segment of existing well Permit
Number _____________, API Number 50-______________________.
Production from or injection into this wellbore must be reported under
the original API Number stated above.
Spacing
Exception
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce or inject is contingent upon issuance of a
conservation order approving a spacing exception. The Operator
assumes the liability of any protest to the spacing exception that may
occur.
Dry Ditch Sample
All dry ditch sample sets submitted to the AOGCC must be in nogreater
than 30-foot sample intervals from below the permafrost or from where
samples are first caught and 10-foot sample intervals through target
zones.
Non-
Conventional
Well
Please note the following special condition of this permit: Production or
production testing of coal bed methane is not allowed for this well until
after the Operator has designed and implemented a water-well testing
program to provide baseline data on water quality and quantity. The
Operator must contact the AOGCC to obtain advance approval of such
a water-well testing program.
Well Logging
Requirements
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types
of well logs to be run. In addition to the well logging program proposed
by the Operator in the attached application, the following well logs are
also required for this well:
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for all well logs run must be submitted to the AOGCC
within 90 days after completion, suspension, or abandonment of this
well, or within 90 days of acquisition of the data, whichever occurs first.
ALPINE OIL
221-116 (Revised)
Additional text for
the approval letter:
SFD 3/24/2023
“For clarity of the well records, all information, survey data, well logs, and other
data from the 3,000' abandoned section of wellbore must be labeled with the well
name and number CRU CD2-361 PB1, API Number 50-103-20836-70-00, and
Permit to Drill Number 221-116.”
CRU CD2-361
COLVILLE RIVER
WELL PERMIT CHECKLISTCompanyConocoPhillips Alaska, Inc.Well Name:COLVILLE RIV UNIT CD2-361Initial Class/TypeDEV / 1-OILGeoArea890Unit50360On/Off ShoreOnProgramDEVField & PoolWell bore segAnnular DisposalPTD#:2211160COLVILLE RIVER, ALPINE OIL - 120100NA1 Permit fee attachedYes Surface Location lies within ADL0380075; Portion of Well Passes Thru ADL0025530;2 Lease number appropriateYes Top Productive Interval lies in ADL0025529; Portion of Productive Interval3 Unique well name and numberYes passes thru AA0084140, ADL0388904, ADL0380093; TD lies in ADL0390344.4 Well located in a defined poolYes COLVILLE RIVER, ALPINE OIL - 120100, governed by CO 443D.5 Well located proper distance from drilling unit boundaryYes CO No. 443D has no interwell spacing restrictions. Wellbore will be more than 500'6 Well located proper distance from other wellsYes from an external property line where ownership or landownership changes.7 Sufficient acreage available in drilling unitYes As planned, well will conform to spacing requirements.8 If deviated, is wellbore plat includedYes9 Operator only affected partyYes10 Operator has appropriate bond in forceYes11 Permit can be issued without conservation orderYes12 Permit can be issued without administrative approvalYes13 Can permit be approved before 15-day waitNA14 Well located within area and strata authorized by Injection Order # (put IO# in comments) (ForNA15 All wells within 1/4 mile area of review identified (For service well only)NA16 Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)Yes 80" conductor provided18 Conductor string providedYes 2316' MD19 Surface casing protects all known USDWsYes 155% excess20 CMT vol adequate to circulate on conductor & surf csgNo21 CMT vol adequate to tie-in long string to surf csgNo uncemented production liner22 CMT will cover all known productive horizonsYes23 Casing designs adequate for C, T, B & permafrostYes Rig has steel tanks24 Adequate tankage or reserve pitNA25 If a re-drill, has a 10-403 for abandonment been approvedYes26 Adequate wellbore separation proposedYes diverter line variance requested and approved27 If diverter required, does it meet regulationsYes Max reservoir pressure 4305 psig(11.5 ppg EMW); will drill w/ 9.5-12.2 ppg EMW; MPD used28 Drilling fluid program schematic & equip list adequateYes29 BOPEs, do they meet regulationYes MPSP is 3579 psig; will test BOPs to 4000 psig30 BOPE press rating appropriate; test to (put psig in comments)Yes31 Choke manifold complies w/API RP-53 (May 84)Yes32 Work will occur without operation shutdownNo H2S measures rqd33 Is presence of H2S gas probableNA34 Mechanical condition of wells within AOR verified (For service well only)Yes H2S not encountered in offset wells. However, rig will be equipped with operational sensors/alarms.35 Permit can be issued w/o hydrogen sulfide measuresYes Maximum expected reservoir pressure is about 11.3 ppg EMW; will be drilled with 9.5 to 12.2 ppg36 Data presented on potential overpressure zonesNA mud using Managed Pressure Drilling technique to maintain borehole stability in shale sections37 Seismic analysis of shallow gas zonesNA and manage reservoir pressure. Some potential to encounter lost circulation. Adequate mud and38 Seabed condition survey (if off-shore)NA LCM supplies will be available on site. Drilling hazards and mitigation discussed on p. 1939 Contact name/phone for weekly progress reports [exploratory only]Geologic Commissioner:Date:Engineering Commissioner:JLCDatePublic CommissionerDateGCW 03/28/23JLC 3/28/2023
1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ___________________
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
Exploratory Development
3. Address: Stratigraphic Service
6. API Number:
7. If perforating:8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception? Yes No
9. Property Designation (Lease Number): 10. Field: Current Pools:
Colville Riber Unit Alpine Pool
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
Casing Collapse
Intermediate 2 5380
Intermediate 3 8260
Intermediate 4 4790
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft):
12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: OIL WINJ WDSPL Suspended
16. Verbal Approval: Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Contact Name: Matt Wiens
Contact Email:
Contact Phone: 281-620-1222
Authorized Title:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other:
Post Initial Injection MIT Req'd? Yes No
Spacing Exception Required? Yes No Subsequent Form Required:
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
Perforation Depth MD (ft):
N/A N/A N/A
12599 13.625
9.875
7.625
5869
1977
MD
6420
8860
6890
6896
7134
18468
20445
Length Size
Proposed Pools:
12599 5681
TVD Burst
PRESENT WELL CONDITION SUMMARY
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL390344, ADL380093, ADL388904, AA084140, ADL388906,
ADL387211, ADL387212, ADL025530, ADL380075
221-116
P.O. Box 100360 Anchorage, Alaska, 99510-0360 50-103-20836-00-00
ConocoPhillips Alaska Inc.
CD2-361
Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): Tubing Size:
N/A N/A
12/10/2022
N/A
N/A
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
AOGCC USE ONLY
matt.r.wiens@cop.com
Drilling Enginer
Perforate
Repair Wepair Well
Exploratory Stratigraphic Development Service
BOP TestMechanical Integrity Test Location Clearance
No
No
Form 10-403 Revised 10/2022 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
By Samantha Carlisle at 11:19 am, Mar 02, 2023
323-128
12/10/2022
x
All conditions of approval in the original PTD, sundries 322-508 and 322-640 apply including AOGCC notes
written in the PTD and in the drilling procedure.
VTL 3/2/2023
BOP test to 4000 psig
Annular preventer test to 2500 psig
file with 10-407 PTD
x
3/2/2023
River
DSR-3/2/22SFD 3/2/2023
ADL0380075, ADL0025530, ADL0025529, ADL0388901, AA00084140,
ADL0388904, ADL0380093 SFD 3/2/2023
JLC 3/2/2023
3/2/23
Brett W.
Huber, Sr.
Digitally signed by Brett W.
Huber, Sr.
Date: 2023.03.02 15:30:42
-09'00'
RBDMS JSB 030323
ConocoPhillips Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
March 1, 2023
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
Re: Sundry for CRU CD2-361 Operational Changes
Dear Sir or Madam:
ConocoPhillips Alaska, Inc. hereby applies for a change to the approved Permit to Drill (221-116) an onshore producer well from the CD2
drilling pad. The change is the location of the production packer from the 7 5/8” liner to the 9 7/8” liner. Current forecast shows that this will
happen the middle of March 2023. This request is coming from full losses on the Intermediate 4 cement job failing to meet 1,000’MD PTD
requirement. The approval is needed before drilling ahead production lateral.
Currently CD2-361 is secured with 13 5/8” x 9 7/8” x 7 5/8” casing that has been pressure tested to 3,500psi. The drilling BHA has been used
to log with sonic in real time to identify top of cement. The PTD requires a 1,000’MD of cement. No cement has been found up to
20,250’MD. Approval to drill ahead and move up the production packer to the 9 7/8” liner is requested Moving the production packer to the
9 7/8” liner will ensure that it is across an interval of liner that has cement, remove the 7 5/8” cement challenges, and maintain containment
of reservoir. ConocoPhillips will work with AOGCC during abandonment operations to secure the 7 5/8” section to meet all regulations.
See attached power point slides supporting this change.
Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this
application includes the following:
1. Form 10-403
2. A proposed drilling program
3. A proposed completion diagram
4. A drilling fluids program summary
Information pertinent to the application that is presently on file at the AOGCC:
1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a)
and (b).
2. A description of the drilling fluids handling system.
3. Diagram of riser set up.
If you have any questions or require further information, please contact Matt Wiens at 281-620-1222
(Matt.R.Wiens@ConocoPhillips.com) or Chris Brillon at 265-6120.
Sincerely, cc:
CD2-361 Well File / Jenna Taylor ATO 540
David Lee ATO 1726
Chris Brillon ATO 1548
Matt Wiens Layla Unger ATO 1756
Senior Drilling Engineer Greg Hobbs ATO 1562
Andy Mack Kuukpik Corp
AOGCC Sundry Well CRU CD2-361
Saved: 1-Mar-23
CRU CD2-361 AOGCC Sundry
Printed: 1-Mar-23
CD2-361
AOGCC Application for Sundry
Intermediate 4 Cement Top
Table of Contents
................................................................................................................................................................ 1
1. Well Name (Requirements of 20 AAC 25.005 (f)) ...................................................... 2
2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) .................................... 2
Requirements of 20 AAC 25.050(b) ........................................................................................................ 2
3. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) ............. 4
4. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8)) .............................. 4
5. Proposed Drilling Program (Requirements of 20 AAC 25.005 (c)(13)) ................... 5
6. Attachments ............................................................................................................. 8
Attachment 1 Completion Schematic ...................................................................................................... 8
Attachment 3 – Property Plat .................................................................................................................. 8
Attachment 4 – Property Plat ............................................................................................................. 10
AOGCC Sundry Well CRU CD2-361
Saved: 1-Mar-23
CRU CD2-361 AOGCC Sundry
Printed: 1-Mar-23
1. Well Name (Requirements of 20 AAC 25.005 (f))
The well for which this application is submitted will be designated as CRU CD2-361.
2. Location Summary (Requirements of 20 AAC 25.005(c)(2))
Location at Surface (CD2-361 Slot) 2,181‘ FNL, 1,770' FEL, Sec. 2, T11N, R4E, UM
NAD27
Northings: 5,974,180
Eastings: 371,464
RKB Elevation 70.2’ AMSL
Pad Elevation 15.5’ AMSL
Location at Productive Horizon (Heel) 5,218' FNL, 950' FEL, Sec. 16, T12N, R4E, UM
NAD27
Northings: 5,981,348
Eastings: 369,237
Measured Depth, RKB: 20233.78’
Total Vertical Depth, RKB: 7103’
Total Vertical Depth, SS: 7031’
Location at Total Depth (Toe) 2,112' FNL, 28' FEL, Sec. 8, T12N, R4E, UM
NAD27
Northings: 6,001,839
Eastings: 359,331
Measured Depth, RKB: 33662’
Total Vertical Depth, RKB: 7195’
Total Vertical Depth, SS: 7125’
Requirements of 20 AAC 25.050(b)
CD2 Pad Layout
AOGCC Sundry Well CRU CD2-361
Saved: 1-Mar-23
CRU CD2-361 AOGCC Sundry
Printed: 1-Mar-23
CD2-361 Well Plat
AOGCC Sundry Well CRU CD2-361
Saved: 1-Mar-23
CRU CD2-361 AOGCC Sundry
Printed: 1-Mar-23
3. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6))
Casing and Cementing Program
Csg/Tbg
OD (in)
Hole
Size (in)
Weight
(lb/ft) Grade Conn. Length
(ft)
Top MD/TVD
(ft)
Btm MD/TVD
(ft) Planned Cement Program
30 56 328 X65 Welded 80 54.5 / 54.5 135 / 135 Cemented to Surface with
13 yds slurry
20 24 133.0 L-80 Hydril
W563 2,412 53 / 53 2,478 / 2,420
Cement to Surface with
2,2558 sx DeepCRETE Lead at 11.0ppg,
836 sx Class G Tail at 15.8ppg
17 17-1/2 x
20 88.1 P-110
IC
Hydril
W521 4,261 2,327 / 2,283 6,400 / 4,398 614 sx Extended Class G Lead at 13.5ppg
498 sx Class G Tail at 15.8ppg
13-5/8 14-3/4 x
17-1/2 88.2 L-80
IC
Hydril
W563 14,080 52 / 52 12,599 / 5,681 889 sx Class G Tail at 15.8ppg
9-7/8 12-1/4 x
13-1/2 62.8 L-80 Hydril
W563 8,400 12,423 / 5645 18,486/ 6,896 684 sx Class G Tail at 15.8ppg
7-5/8 8-½ x
10-1/4 29.7 L-80 Hydril
W523 1,695 18,103 / 6,883 20,468 / 7,134 251 sx Class G Tail at 15.8ppg
5 n/a 24.1 L-80 Hydril
W563 7,954 46 / 46 8,004 / 4,631 N/A – Upper Part of Tapered Upper
Completion Tubing String
4-1/2 n/a 12.6 L-80 Hydril
W563 15,931 8,004 / 4,631 20,091 / 7,120 N/A – Lower Part of Tapered Upper
Completion Tubing String
4-1/2 6-3/4 12.6 L-80 Hydril
W563 9,118 20,318 / 7,120 33,663 / 7,196 N/A – Uncemented Open Hole Liner w/
Pre-Perforated Pup Joints
4. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8))
Surface Intermediate
#1
Intermediate
#2
Intermediate
#3
Intermediate
#4 Production
Hole Size in 24 17-1/2 x 20 14-3/4 x 17-
1/2
12-1/4 x
13-1/2
8-1/2 x 10
1/4 6-3/4
Casing
Size in 20 17 13-5/8 9-7/8 7-5/8 4-1/2
Density ppg 9.5 – 10.0 10.5 – 11.0 10-11 10.5 – 12.2 11-12.5 10.0 – 11.5
PV cP 9 – 10 12 – 13 9-10 13 – 21 20-30 11
YP
lb./
100
ft2
45 – 50 25 – 40 25 – 40 20 – 30 30-40 15 - 25
Initial
Gels
lb./
100
ft2
46 14 15 10 10 7
10
Minute
Gels
lb./
100
ft2
48 15 25 23 13 8
API Fluid
Loss
cc/
30
min
N.C. – <
10.0 4 – 12 2 – 10 < 6 < 6 < 6
pH 11.0 9.0 – 10.0 9.0 – 10.0 9.0 – 10.5 9.0-10.5 9.0 – 9.5
Production Hole:
The Production interval will be drilled with a water-based drill-in fluid (FLO-PRO WBM) weighted
appropriately so that MPD can provide a dynamic overbalance of ~10.8ppg EMW while reducing the risk
of lost circulation created by high ECDs. There is potential for lost circulation so ensure adequate LCM
material is available on location to address any losses. There is a potential for abnormal pressure so
AOGCC Sundry Well CRU CD2-361
Saved: 1-Mar-23
CRU CD2-361 AOGCC Sundry
Printed: 1-Mar-23
ensure adequate weighting material is on location to weight-up as needed. Kill-weight brine will be placed
in the well prior to pulling out of hole.
Please reference pit diagram on file for Doyon 26. All drilling fluid practices will be in accordance with
appropriate regulations stated in 20 AAC 25.033.
5. Proposed Drilling Program (Requirements of 20 AAC 25.005 (c)(13))
The proposed drilling program is listed below. Please refer to Completion Schematic.
1. MIRU Doyon 26 onto CRU CD2-361 over pre-installed 30” x 48” insulated conductor.
2. Dewater cellar, rig-up riser, & test same.
3. Pick-up enough 6-5/8” VX69 drill pipe to drill SURF section and rack-back.
4. Make-up 24” Conductor Clean-Out BHA. Clean-out conductor.
5. Make-up 24” SURF Drilling BHA (LMWD Program: GR/DIR), spud well, & directionally-drill 24” hole to
SURF TD estimated at 2,477’ MD / 2,420’ TVD top-setting the C-30 and as per the directional plan.
9.5 – 10ppg DRILPLEX WBM will be used to drill the section.
6. Circulate & condition, flow-check well, and POOH. Lay-down SURF Drilling BHA.
7. Run new 20” 133# L-80 TNS-ER SURF casing centralized as per design to section TD. Circulate & condition,
land casing on hanger within wellhead, and back-off upper half of landing joint.
8. Pick-up & TIH with the SURF Inner String BHA, stab into the inner string float collar, and establish circulation.
9. Cement the 20” SURF casing to surface as per the cement program with 500’ of 15.8ppg Class G tail and
11.0ppg DeepCRETE lead to surface. Bump inner string darts, bleed pressure, & check floats.
a. CONTINGENCY: If cement is not brought to surface, notify AOGCC and prepare for top job.
10. Flow check well, N/D flow riser & N/U HP Riser & BOPE with the following equipment/configuration:
a. 18-5/8” Annular / Upper 4-1/2” x 7-5/8” VBR / Blind/Shear Ram / Lower 4-1/2” x 7-5/8” VBR
11. Test BOPE to 250psi low / 4,000psi high. Test annular to 250psi low / 2,500psi high. (Provide 48 hr. AOGCC
notice)
12. Pick-up & TIH with the 17-1/2” x 20” INTRM1 Drilling BHA (LMWD Program: GR/RES/DIR).
a. CONTINGENCY: If unable to clean-out SURF casing shoe track with INTRM1 Drilling BHA, drill out
SURF casing shoe track with dedicated SURF Casing Clean-Out BHA and perform FIT.
13. Chart 20” SURF casing pressure test to 3,000psi for 30 minutes.
14. Drill-out shoe track, 24” rathole, and 20’ of new hole. Circulate & condition.
15. Perform FIT to minimum 14.0ppg EMW.
16. Displace well to 10.5ppg LSND WBM.
17. Directionally drill 17-1/2” INTRM1 Pilot Hole until the underreamer is below the 20” SURF Casing Shoe and open
the underreamer.
18. Directionally drill 17-1/2” x 20” INTRM1 Hole past the Base Qannik. Circulate a minimum 1x bottom’s up and flow
check the well to determine if additional overbalance is needed.
19. Directionally drill 17-1/2” x 20” INTRM1 Hole to INTRM1 TD at 6,400’ MD / 4,398’ TVD as per the
directional plan. Circulate & condition while weighting up as needed for a trip margin.
20. Observe well for flow
21. POOH and lay-down the 17-1/2” INTRM1 Drilling BHA.
22. Change Upper 4-1/2” x 7-5/8” VBRs to 17” Solid-Body Rams. Test same to 250psi low / 3,000psi high. (Provide
48 hr. AOGCC notice)
23. Run new 17” 88.1# P-110 IC TSH-521 liner centralized as per design. Circulate & condition prior to exiting the
SURF Casing Shoe and again before making-up the Liner Hanger.
24. M/U the 17” x 20” INTRM1 Liner Hanger / Running Tool Assembly and TIH with the 17” INTRM1 liner to above
rat hole. Once there, circulate & condition as needed in preparation for the cement job.
AOGCC Sundry Well CRU CD2-361
Saved: 1-Mar-23
CRU CD2-361 AOGCC Sundry
Printed: 1-Mar-23
25. Cement the 17” INTRM1 liner with sufficient 13.5ppg Extended Class G led to provide 500’ isolation above the
Top Qannik and a 500’ 15.8ppg tail to tack the 17” INTRM1 Liner Shoe. Bump plugs to 500psi over circulating
pressure, bleed pressure, & check floats.
a. CONTINGENCY: If cement is not circulated above the Qannik, drill, case, cement INTRM2. Intrm 1 is a
drilling liner and will be covered by Intrm 2 long string.
26. Set the 17” x 20” TIW XPAK Liner Hanger. Perform overpull test to confirm hanger set.
27. Perform Liner-Top test to 1,000psi.
28. Pick-up to release running tools from Liner Hanger. Circulate & condition. Flow-check well.
29. TOH on elevators. Lay-down INTRM1 Liner Running Tools.
30. Change 17” Solid-Body Rams back to 4-1/2” x 7-5/8” VBRs. Test same to 250 / 4,000psi. (Provide 48 hr.
AOGCC notice)
31. Pick-up & TIH with 15-3/4” INTRM1 Clean-Out BHA to the 17” INTRM1 Liner top.
32. Circulate & condition, drill-out pack-off bushing below Liner Hanger, circulate bottom’s up, and continue TIH.
33. Chart 20” casing x 17” liner pressure test to 3,000psi for 30 minutes.
34. Drill-out shoe track, 17-1/2” x 20” rathole, and 20’ of 15 ¾” new hole. Circulate & condition.
35. Perform FIT to minimum 11.2ppg EMW.
36. Circulate & condition, observe well for flow, and TOH. Lay-down the 15-3/4” INTRM1 Clean-Out BHA.
37. Pick-up & TIH with 15-3/4” x 17-1/2” INTRM2 Drilling BHA to the 17” INTRM1 Liner Shoe (LMWD Program:
GR/RES/DIR).
38. Displace the well to 10.5ppg LSND WBM.
39. Open underreamer and directionally-drill 15-3/4” x 17-1/2” INTRM2 hole to TD at 14,134’ MD.
a. This hole section is the upper part of the original 5 string INT2 hole section, the drilling/tripping out time
is estimated to be over 14 days. To avoid the high risk of stuck pipe, ConocoPhillips is requesting to
continue the approved Event Based BOP testing schedule from original INT2. Perform full BOP test
once BHA out of hole.
40. POOH and lay-down 15-3/4” x 17-1/2” INTRM2 Drilling BHA.
41. Change Upper 4-1/2” x 7-5/8” VBRs to 13-5/8” Solid-Body Rams. Test same to 250psi low / 3,000psi high.
(Provide 48 hr. AOGCC notice)
42. Float new 13-5/8” 88.2# L-80 IC TSH-563 INTRM2 Casing centralized as per design to TD; attempt to run on
elevators and rotate only if needed to move past a ledge or to break axial friction.
43. Circulate & condition in preparation for the cement job.
44. Cement the 13-5/8” INTRM2 liner with sufficient 15.8ppg Class G to tack the INTRM2 casing shoe with 250’ TVD
slurry.
45. Install pack off and displace the 13-5/8” x 17” x 20” annulus to corrosion-inhibited seawater and diesel freeze-
protect.
46. Change 13-5/8” solid body rams back to 4-1/2” x 7-5/8” VBRs. Test same to 250 / 4,000psi. (Provide 48 hr.
AOGCC notice)
47. Pick-up & TIH with 12-1/4” x 13-1/2” INTRM3 Drilling BHA (LMWD Program: GR/RES/NEU/DEN/SON/DIR).
48. Chart 13-5/8” INTRM2 casing pressure test to 4,000psi for 30 minutes.
49. Drill-out shoe track, 14-3/4” x 17-1/2” rathole, and 20’ of new 12-1/4” hole.
50. Perform FIT to minimum 11.2ppg EMW.
51. Displace well to 11.0ppg LSND WBM.
52. Directionally drill 12-1/4 x 13-1/2” new INTRM3 hole to TD 10’ TVD below the Top HRZ estimated at 18,550’ MD
/ 6,915’ TVD.
a. This hole section is the lower part of the original 5 string INT2 hole section, the drilling/tripping out time
is estimated to be over 14 days. To avoid the high risk of stuck pipe, ConocoPhillips is requesting to
AOGCC Sundry Well CRU CD2-361
Saved: 1-Mar-23
CRU CD2-361 AOGCC Sundry
Printed: 1-Mar-23
continue the approved Event Based BOP testing schedule from original INT2. Perform full BOP test
once BHA out of hole.
53. Circulate & condition hole while weighting-up to 11.5ppg. Observe well for flow.
54. POOH and lay-down 12-1/4 x 13-1/2” INTRM3 Drilling BHA.
55. Change Upper 4-1/2” x 7-5/8” VBRs to 9-7/8” Solid-Body Rams. Test same to 250psi low / 4,000psi high.
(Provide 48 hr. AOGCC notice)
56. Float 9-7/8” 62.8# L-80 TSH-563 new INTRM3 Liner centralized as per design to TD. Cement the same with
15.8ppg Class G to 250’ TVD above the shoe.
57. Set the Liner Hanger. Test the backside to 1,000 psi for integrity.
58. POOH and L/D liner hanger running tool.
59. Change Upper back to 4-1/2” x 7-5/8” VBRs. Test same to 250psi low / 4,000psi high. (Provide 48 hr. AOGCC
notice)
60. Pressure tests the 9-7/8” liner and 13-5/8” casing to 4,000psi for 30 minutes.
61. Pick-up & TIH with 8-1/2” x 10-1/4” INTRM4 Drilling BHA (LMWD Program: GR/RES/NEU/DEN/SON/DIR).
a. TOC will be logged with Sonic tool
62. Displace well to 11.5ppg NAF SBM.
63. Drill-out shoe track and 20’ of new hole. Perform FIT to minimum 11.1ppg EMW.
64. Directionally drill 8-1/2” x 10-1/4” hole to section TD within the Fiord West Kuparuk C at 20,391’ MD / 7,107’ TVD
using MPD to target 13.0-13.2ppg EMW at 7,101’ TVD.
65. SOOH to 9 7/8” shoe.
66. Circulate & weight up the mud to 13.1ppg kill-weight NAF SBM.
67. Flow check, SOOH, and lay-down 8-1/2” x 10-1/4” Drilling BHA.
68. Run new 7-5/8” 29.7# L-80 TSH-523 INTRM3 Liner to TD.
69. Cement the 7-5/8” liner with 15.8ppg tail Class G to 250’ TVD above the top of Kuparuk C reservoir.
70. Set liner hanger and perform 1,000 psi back pressure test.
71. POOH and L/D liner hanger running tool.
72. Pressure test 13-5/8” x 9-7/8” x 7-5/8” Liner pressure test to 4,000psi for 30 minutes.
73. Pick-up & TIH with 6-3/4” PROD Drilling Assembly (LMWD Program: GR/RES/NEU/DEN/DIR).
74. Displace well to new 10.0ppg FLO-PRO WBM.
75. Drill out shoe track, 8-1/2” x 10-1/4” rat hole, and 20’ of new hole. Perform FIT to minimum of 10.8ppg EMW.
Perform draw down. Weight up mud to above pore pressure.
76. Directionally drill 6-3/4" hole to the Production TD at 33,663’ MD geo-steering to stay within the Kuparuk C while
using MPD to target 10.8 EMW at 7 5/8” Shoe.
77. Circulate & condition. BROOH to the 7-5/8” INTRM3 liner shoe and further as needed to clean up the well.
78. Strip-in back to bottom.
79. Circulate & condition, displace well to kill-weight brine, flow check, & TOH. Lay-down 6-3/4” PROD Drilling BHA.
80. Run new 4-1/2” 12.6# L-80 TSH 563 Liner with pre-perforated pups centralized as per design.
81. Pick-up the 7 5/8” x 5-1/2” Liner Hanger / Packer with Running Tool Assembly to the Rig Floor. Make-up to the
liner hanger.
82. TIH with 4-1/2” PROD Liner; rotate as needed to reduce axial friction and run to TD. Circulate as needed through
the open circulation sub.
83. With the liner on bottom, set the liner top packer as per equipment specs.
84. Release running tools, perform ~1,000psi liner-top test to confirm packer & liner barrier integrity.
85. TOH on elevators. Lay-down PROD Liner Running Tools.
AOGCC Sundry Well CRU CD2-361
Saved: 1-Mar-23
CRU CD2-361 AOGCC Sundry
Printed: 1-Mar-23
86. Run 5” x 4-1/2” Upper Completion with smart gas lift mandrels. Space out, pick-up, & with the annular closed on
landing string, spot diesel freeze-protect. Land tubing hanger & pressure-up to set packer. Confirm connectivity
to smart GLMs.
a. Production packer will be set at 18,050’MD, just above 7 5/8” liner
87. Install BPV and pressure test hanger seals to 5,000psi, chart test.
88. Nipple down BOPE.
89. Install tubing head adapter assembly and tree. Pressure-test same to 5,000psi, chart test. Remove BPV.
90. Test tubing and tubing-casing annulus separately to 3,500psi / 30 mins, chart tests.
91. Shear circulation valve in GLM. Circulate tubing to diesel & freeze-protect annulus.
92. Set BPV and secure well. RDMO Doyon 26.
93. POST RIG – Ops
a. Pressure-up to convert flotation barrier disk & unload well.
6. Attachments
Attachment 1 Completion Schematic
Attachment 2 Powerpoint supplemental information
Attachment 3 – Property Plat
AOGCC Sundry Well CRU CD2-361Saved: 1-Mar-23CRU CD2-361 AOGCC SundryPrinted: 1-Mar-23Attachment 3 –Completion SchematicD26 RKB 54.6' Component Description MD (ft) TVD (ft)Length (ft)115-1/2" x 7-5/8" Liner Top Packer / Hanger 20,241' 7,126' 39'125-1/2" Casing Pup Joint 20,271' 7,128' 10'134-1/2" Disappearing Disk Sub (IRSV) 20,281' 7,128' 5'144-1/2" Shoe - Orange peel eccentric nose 33,657' 7,258' 5'Lower Completion Component Details14ABCDHIEG523Component DescriptionLength (ft)5-7/8" HWDP 700'5-7/8" Drill Pipe 7,500'4-1/2" Drill Pipe 18,000'4-1/2" circulation sub (SLB MI Well Commander/ WFT Jet Streams)10'Liner Running Tool 20'Lower Running String Component Details6MD TVD MD TVDACOND 30" X52, 1" thickness 54' 54' 150' 150'BSURF CSG 20" 133#, L80, T-ER 54' 54' 2,478' 2,411'CINT1 LNR 17" 88.1#, P110-IC, HYD521 2,319' 2,305' 6,404' 4,407'DINT2 CSG 13-5/8" 88.2#, L80-IC, HYD563 54' 54' 12,599' 5,681'EINT3 LNR 9-7/8" 62.8#, L80, HYD563 12,423' 5,640' 18,468' 6,896'FINT 4 LNR 7-5/8" 29.7#, L80-IC, HYD523 18,103' 6,820' 20,445' 7,136'GPROD LNR 4-1/2"12.6#, P110S, HYD5631 perf per 2 blank joint20,241' 7,107' 33,663' 7,196'HCOMP TBG 5" 24.1#, L80, HYD563 54' 54' 5,023' 4,080'ICOMP TBG 4-1/2" 12.6#, L80, HYD563 5,023' 4,080' 20,240' 7,107'Casing and Tubing DetailsTop (ft)Bottom (ft)DescriptionSize StringF911-121314Upper Completion Centralizers:5" x 13-5/8" Yellow PolyOil cross coupling clamp 11.75" OD and WFT cross coupling clamp 12" OD4-1/2" x 13-5/8" Blue PolyOil cross coupling clamp 11.75" OD and WFT cross coupling clamp 12" OD4-1/2" x 9-7/8" Blue PolyOil cross coupling clamp 8.00" ODLower Completion Centralizer:4-1/2" x 6-1/8" Volant Hydroform CentralizerUpper Completion Assembly MD (ft) TVD (ft) Inclination13.813" DB Nipple (3.843" lock no go) 2,146' 2,100' 2025" x 1" KBG 4-5 GLM #1 - DV 4,087' 3,652' 5334-1/2" x 5" Crossover 5,023' 4,088' 704-1/2" 3.813" X Nipple (3.813" selective) 5,355' 4,189' 754-1/2" Silverwell Smart GLM #2 5,360' 4,179' 754-1/2" 3.813" ID polish bore sub 5,367' 4,191' 7554-1/2" x 1" KBG 4-5 GLM #3 - DV 6,026' 4,330' 784-1/2" 3.750" DB Nipple (3.785" lock no go) 17,918' 6,781' 784-1/2" Silverwell Smart GLM #4 17,923' 6,782' 784-1/2" 3.750" ID polish bore sub 17,930' 6,784' 7874-1/2" CMD Sliding Sleeve w/3.687" DB Nipple (3.735" lock no go)17,988' 6,796' 7884-1/2" x 9-7/8" Premier Packer with Striker 18,051' 6,810' 7894-1/2" 3.562" DB (3.609" lock no go) 18,121' 6,824' 784-1/2" 3.448" Ball Seat (3.5" Ball) 20,228' 7,125' 894-1/2" Baker KNOB Locator 20,240' 7,126' 894-1/2" EOT w/ Self-Aligning Mule Shoe 20,245' 7,126' 8910647810
AOGCC Sundry Well CRU CD2-361
Saved: 1-Mar-23
CRU CD2-361 AOGCC Sundry
Printed: 1-Mar-23
Attachment 4 – Property Plat
CD2-361 Intermediate 4 Cement Job & Alternative Design
Initial 2.22.22 Email2Doyon 26 lost full returns 3 hours into circulating on depth with our 7 5/8” liner yesterday afternoon. We attempted to regain circulation, but it seems the formation could no longer hold the hydrostatic column in the well seen after the DFIT. No pack offincident was seen. Being on NAF, we have a limited supply, and we were going to be out of NAF the lost rate we were seeing. LCM was limited due to partial size and density that could fit through shoe track. The decision was made to pump cement as there were no other options to stim the losses.The next BHA in the hole will have a sonic login real time. We will log the 9 7/8” and 7 5/8” cement. Since the loss zone is unknown, there are 2 outcomes. 1. We meet the 1,000’MD APD, this was seen on CD2-310. 70% losses were seen but the cement column was 1,500’MD2. We do not meet 1,000’MD APD.Below is a request for pre-approval on option #2. Request:If the sonic log shows less than 1,000’MD, COP requests to continue with operations drilling the lateral based on the following criteria:xCD2-361 is a producing well that is not being fractured.x9 7/8” shoe is inside the confining shale interval above the reservoir.xThe 9 7/8” shoe has an FIT to 14.5ppge, well above the APD of 10.8ppge. If pressure is communicated to intermediate 4 open hole, the DFIT in Intrm 4 showed the open hole (shale and sand) was 13.7ppge. After the test we could only hold a 13.2ppge.xKick tolerance for the production lateral passes with the 9 7/8” FIT value of 14.5ppge at the 9 7/8” shoexThe shales will collapse around the 7 5/8” liner creating a barrier, as seen historically, due to the hydrostatic being insufficient to hold the shales up.xTo ensure the APD was met we pumped 1,500’MD, 150% more than needed.
Current State of CD2-36136-3/4" Hole x 4-1/2" 12.6# L80 HYD563 Perforated Liner33,663' MD / 7,196' TVD 90° Inc' CD2-361 6-String Design Schematic(Updated 2/22/2023 MRW Actual)D
B30" Conductor @150' MD17-½ x 20" Hole x 17" 88.1# P110IC HYD521 Liner6,404' MD / 4,XXX' TVD 15-¾ x 17-1/2" Hole x 13-5/8" 88.2# L80IC HYD563 Casing12,599' MD / 5,681' TVD12-¼ x 13-1/2" Hole x 9-7/8" 62.8# L80 HYD563 Liner18,468' MD / 6,896' TVD 24" Hole x 20" 133.1# L80 T-ER Casing2,478' MD / ' TVD 8-1/2 x 10-1/4" Hole x 7 5/8" 29.7# L80 HYD523 Liner20,445' MD / 7,134' TVD Red – PlannedBlack - Actual9 7/8" TOC – 17,258' MD / 6,646' TVD13 5/8" TOC – 11,471' MD / 5,448' TVD7 5/8" TOC – 18,945' MD / 6,987' TVD
CD2-361 Intermediate 4 Cement Job4
CD2-361 13 5/8” x 9 7/8” x 7 5/8” Casing Test5
INT3 shoe depthINT3 Shoe set in HRZ Shale6Bad log data due to shoeMarker MD TVDSSHRZ from resistivity image 18,235 -6,777HRZ from logs 18,341 -6,799INT3 shoe depth 18,468 -6,826HRZ marker picked from logs (highest GR)Beginning of HRZ shale as seen in resistivity image logsTrack 7TTrack 6Traditional log derived HRZ pick is 22 ft deeper than first appearance of shale via resistivity image log•INT3 shoe is set 49 ft TVD into demonstrated HRZ shale interval Track 1: Very high GR >300 APITrack 6: Cuttings percentages demonstrate change from claystone dominated to shale dominatedTrack 7: Resistivity image shows stark transition from silts and claystones (bright) to shales (dark)Track 1
CD2-361 Lower Shales to Kuparuk C Sand 7Bad log data due to shoeClaystoneShaleClaystoneystoneSiltstoneSiltstonSiltstonSiltstoSandstoneNEUTNEUTDENSRESGReeeeeeeeeeCuttings %ROP•INT3 shoe is set 49 ft TVD into demonstrated HRZ shale intervalDFIT was 14.5ppge•Core photos and CT scans from core in CD4-213A (Nanuq Kuparuk field) illustrate nature of HRZ and Kalubik shales below•Lithologies from shoe to Kuparuk C sand represent impermeable shales of varying faciesUpper Kalubik and Lower Kalubik are deep basinal anoxic marine shalesHRZ is a slightly siltier shale, also highly anoxic•There are no demonstrated permeable sandstone intervals in CD2-361 between the INT3 shoe and Kuparuk C sandCT images of formations cored in CD4-213A.Core photos of selected formations CD4-213ACT images of Kalubik natural fractures CD4-213A
SLB-PrivateObservations:The interval presented to evaluate the cement behind the 9.875 in and 7.625 in casings is from 16286 ft to 20389ft MD. During RT Top of Cement (TOC) operations, the logging speed was kept at an average of 500 ft/hr. The data was logged while Reaming Down with SonicScope475, which had the sonic signal 114.21 ft from the bit. The interpretation is based on the fact that the TOC will be the depth above which ST projection will show strong casing coherence, slowness values correspond to casing slowness values, and most importantly, casing amplitude is high. High casing amplitudes indicate free pipe, while low amplitudes indicate the presence of cement behind the casing. Top of Cement Evaluation
SLB-PrivateTop of Cement EvaluationObservations:From ~16724 ft MD in the 9.875in casing and down to the start of the overlap, we observe the following: їCasing amplitudes with zero to near zero values (zero reference is the vertical red dashed line)їThe casing coherence on the projection is weak to absentїConsistent formation arrivals are observedїSlowness values corresponding to compressional values of offset wells.These observations support the presence of a good cement bond behind the single cased 9.875 in section from 16724 ft MD to the top of the overlap section. Therefore, the apparent Top of Cement is ~16724 ft MD. Good Cement Bond
SLB-PrivateTop of Cement EvaluationObservations:A poor to absent cement bond is identified by:їHigh casing amplitudeїSlowness value (DTCO_MH_RT) corresponding to casing slowness (~56 us/ft)їStrong casing coherence (red/orange) on the projection trackїWeak (light blue) to absent (white) coherence on the formation arrivalsThe above are observed in the Free Pipe sections. Free Pipe is confirmed in the single 7.625in casing from ~18468 ft to 20281 ft MD (SonicScope sensor depth). 20281 ft18468 ftFree Pipe
15-¾ x 17-1/2" Hole x 13-5/8" 88.2# L80IC HYD563 Casing12,599' MD / 5,681' TVD12-¼ x 13-1/2" Hole x 9-7/8" 62.8# L80 HYD563 Liner18,468' MD / 6,896' TVD 8-1/2 x 10-1/4" Hole x 7 5/8" 29.7# L80 HYD523 Liner20,445' MD / 7,136' TVD 13 5/8" TOC – 11,471' MD / 5,448' TVD9 7/8" ShoeDFIT to 14.5ppge13 5/8" x 9 7/8" x 7 5/8"Casing Test to 3,500psi9 7/8" TOC – 16,724' MD / 6,535' TVD7 5/8" ShoeDFIT to 11.1ppgeConfining the Reservoir11Committed to working with regulators to meet all regulations during abandonment 9 7DFIT The yellow arrows are hydrocarbons coming from the reservoir on both the inside and outside of the 4 ½”The red highlights are well barriers in place to confine the reservoirConfining to Reservoir with Current Well Design
15-¾ x 17-1/2" Hole x 13-5/8" 88.2# L80IC HYD563 Casing12,599' MD / 5,681' TVD12-¼ x 13-1/2" Hole x 9-7/8" 62.8# L80 HYD563 Liner18,468' MD / 6,896' TVD 8-1/2 x 10-1/4" Hole x 7 5/8" 29.7# L80 HYD523 Liner20,445' MD / 7,136' TVD 9 7/8" TOC – 16,724' MD / 6,535' TVD13 5/8" TOC – 11,471' MD / 5,448' TVD9 7/8" ShoeDFIT to 14.5ppge13 5/8" x 9 7/8" x 7 5/8"Casing Test to 3,500psi7 5/8" ShoeDFIT to 11.1ppgeConfining the Reservoir12Committed to working with regulators to meet all regulations during abandonment 9 7DFIT The yellow arrows are hydrocarbons coming from the reservoir on both the inside and outside of the 4 ½”The red highlights are well barriers in place to confine the reservoirAlternative Production Packer PlacementThis design allows for production packer to be place across cement interval if the 7 5/8” cement is not seen7/8" x 7 5/8""st to 3,500psi
CD2-361 Completion Schematic -9 7/8” Production Packer13D26 RKB 54.6' Component Description MD (ft) TVD (ft)Length (ft)115-1/2" x 7-5/8" Liner Top Packer / Hanger 20,241' 7,126' 39'125-1/2" Casing Pup Joint 20,271' 7,128' 10'134-1/2" Disappearing Disk Sub (IRSV) 20,281' 7,128' 5'144-1/2" Shoe - Orange peel eccentric nose 33,657' 7,258' 5'Lower Completion Component Details14ABCDHIEG523Component DescriptionLength (ft)5-7/8" HWDP 700'5-7/8" Drill Pipe 7,500'4-1/2" Drill Pipe 18,000'4-1/2" circulation sub (SLB MI Well Commander/ WFT Jet Streams)10'Liner Running Tool 20'Lower Running String Component Details6MD TVD MD TVDACOND 30" X52, 1" thickness 54' 54' 150' 150'BSURF CSG 20" 133#, L80, T-ER 54' 54' 2,478' 2,411'CINT1 LNR 17" 88.1#, P110-IC, HYD521 2,319' 2,305' 6,404' 4,407'DINT2 CSG 13-5/8" 88.2#, L80-IC, HYD563 54' 54' 12,599' 5,681'EINT3 LNR 9-7/8" 62.8#, L80, HYD563 12,423' 5,640' 18,468' 6,896'FINT 4 LNR 7-5/8" 29.7#, L80-IC, HYD523 18,103' 6,820' 20,445' 7,136'GPROD LNR 4-1/2"12.6#, P110S, HYD5631 perf per 2 blank joint20,241' 7,107' 33,663' 7,196'HCOMP TBG 5" 24.1#, L80, HYD563 54' 54' 5,023' 4,080'ICOMP TBG 4-1/2" 12.6#, L80, HYD563 5,023' 4,080' 20,240' 7,107'Casing and Tubing DetailsTop (ft)Bottom (ft)DescriptionSize StringF911-121314Upper Completion Centralizers:5" x 13-5/8" Yellow PolyOil cross coupling clamp 11.75" OD and WFT cross coupling clamp 12" OD4-1/2" x 13-5/8" Blue PolyOil cross coupling clamp 11.75" OD and WFT cross coupling clamp 12" OD4-1/2" x 9-7/8" Blue PolyOil cross coupling clamp 8.00" ODLower Completion Centralizer:4-1/2" x 6-1/8" Volant Hydroform CentralizerUpper Completion Assembly MD (ft) TVD (ft) Inclination13.813" DB Nipple (3.843" lock no go) 2,146' 2,100' 2025" x 1" KBG 4-5 GLM #1 - DV 4,087' 3,652' 5334-1/2" x 5" Crossover 5,023' 4,088' 704-1/2" 3.813" X Nipple (3.813" selective) 5,355' 4,189' 754-1/2" Silverwell Smart GLM #2 5,360' 4,179' 754-1/2" 3.813" ID polish bore sub 5,367' 4,191' 7554-1/2" x 1" KBG 4-5 GLM #3 - DV 6,026' 4,330' 784-1/2" 3.750" DB Nipple (3.785" lock no go) 17,918' 6,781' 784-1/2" Silverwell Smart GLM #4 17,923' 6,782' 784-1/2" 3.750" ID polish bore sub 17,930' 6,784' 7874-1/2" CMD Sliding Sleeve w/3.687" DB Nipple (3.735" lock no go)17,988' 6,796' 7884-1/2" x 9-7/8" Premier Packer with Striker 18,051' 6,810' 7894-1/2" 3.562" DB (3.609" lock no go) 18,121' 6,824' 784-1/2" 3.448" Ball Seat (3.5" Ball) 20,228' 7,125' 894-1/2" Baker KNOB Locator 20,240' 7,126' 894-1/2" EOT w/ Self-Aligning Mule Shoe 20,245' 7,126' 8910647810
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report for:
Reviewed By:
P.I. Suprv
Comm ________COLVILLE RIV UNIT CD2-361
JBR 02/21/2023
MISC. INSPECTIONS:
FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK:
ACCUMULATOR SYSTEM:MUD SYSTEM:
P/F P/F
P/FP/FP/F
Visual Alarm
QuantityQuantity
Time/Pressure
SizeQuantity
Number of Failures:1
Tested with 5 7/8 and 6 5/8 test joints. FP on lower rams with 6 5/8 test joint. Cycled rams several times and retested (pass).
We did a little housekeeping along the way to stay busy between tests.
Test Results
TEST DATA
Rig Rep:Kevin HinrichsOperator:ConocoPhillips Alaska, Inc.Operator Rep:Einer Fleagle
Rig Owner/Rig No.:Doyon 26 PTD#:2211160 DATE:1/17/2023
Type Operation:DRILL Annular:
250/2500Type Test:BIWKLY
Valves:
250/4000
Rams:
250/4000
Test Pressures:Inspection No:bopSTS230115100753
Inspector Sully Sullivan
Inspector
Insp Source
Related Insp No:
INSIDE REEL VALVES:
Quantity P/F
(Valid for Coil Rigs Only)
Remarks:
Test Time 11
MASP:
3579
Sundry No:
Control System Response Time (sec)
Time P/F
Housekeeping:P
PTD On Location P
Standing Order Posted P
Well Sign P
Hazard Sec.P
Test Fluid W
Misc NA
Upper Kelly 1 P
Lower Kelly 1 P
Ball Type 4 P
Inside BOP 2 P
FSV Misc 0 NA
16 PNo. Valves
1 PManual Chokes
1 PHydraulic Chokes
0 NACH Misc
Stripper 0 NA
Annular Preventer 1 18 3/4"P
#1 Rams 1 4 1/2"x7 5/8"P
#2 Rams 1 Blind /Shear P
#3 Rams 1 3 1/2"x6 5/8"FP
#4 Rams 0 NA
#5 Rams 0 NA
#6 Rams 0 NA
Choke Ln. Valves 1 3 1/8"P
HCR Valves 2 3 1/16" & 3 1/P
Kill Line Valves 2 3 1/16"P
Check Valve 0 NA
BOP Misc 0 NA
System Pressure P2900
Pressure After Closure P1650
200 PSI Attained P26
Full Pressure Attained P138
Blind Switch Covers:Pall stations
Bottle precharge P
Nitgn Btls# &psi (avg)P10@4000
ACC Misc NA0
P PTrip Tank
P PPit Level Indicators
P PFlow Indicator
P PMeth Gas Detector
P PH2S Gas Detector
0 NAMS Misc
Inside Reel Valves 0 NA
Annular Preventer P14
#1 Rams P15
#2 Rams P17
#3 Rams P15
#4 Rams NA0
#5 Rams NA0
#6 Rams NA0
HCR Choke P2
HCR Kill P2
FP
Tested with 5 7/8 and 6 5/8 test joints. FP on lower rams with 6 5/8 test joint. Cycled rams several times and retested (pass).
Doyon 26 CD2-361 1-17-23 Test Sequence
5-7/8 Test Joint
#1. Annular
#2. UPR/ Valves 1,14,15,16/ kill valve 3/ upper IBOP
#3. Valves 10,13/ HCR kill/ Lower IBOP
#4. Valves 4,9,12/ Manual kill
#5. Valves 6,8,11/ 6-5/8 FOSV #1
#6. Valves 5,7/ 6-5/8 FOSV #2
#7. Valve 2/ 6-5/8 dart
#8. HCR choke/ 5-7/8 FOSV #1
#9. Manual choke/ 5-7/8 FOSV #2
#10. LPR
#11. Blind rams/ valves 3,4,6
6-5/8 Test Joint
#12. Annular
#13. UPR
#14. LPR
#15. Choke A
#16. Choke B
DOYON RIG 26 ACCUMULATOR DRAW DOWN WORKSHEET
WELL: CD2-361 DATE: 1/17/22
ACCUMULATOR PSI 2900
MANIFOLD PSI 1480
FUNCTION RAMS/ANNULAR/ HCR'S, DON'T FUNCTION BLINDS! FUNCTION ONE RAM TWICE
LET PRSSURE STABILIZE AND RECORD BACK UP NITROGEN BOTTLE'S
ACCUMULATOR PSI 1650
NITROGEN BOTTLE'S 10ea 4000psi Avg.
TURN ON ELEC. PUMP, SEC FOR 200 PSI = 26 *used 1 of 2 electric pumps for th
TURN ON AIR PUMP'S
TIME FOR FULL CHARGE = 138
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report for:
Reviewed By:
P.I. Suprv
Comm ________COLVILLE RIV UNIT CD2-361
JBR 01/26/2023
MISC. INSPECTIONS:
FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK:
ACCUMULATOR SYSTEM:MUD SYSTEM:
P/F P/F
P/FP/FP/F
Visual Alarm
QuantityQuantity
Time/Pressure
SizeQuantity
Number of Failures:1
Kam witnessed the PVTs and gas alarms earlier in the day when he did the rig inspection. Had to wait for hours for them to
break in new rams as per NOV. F/P on top set of rams, had to increase Accu pressure to get them to hold. 10 min high tests
were done for BLM regs.
Test Results
TEST DATA
Rig Rep:NewmanOperator:ConocoPhillips Alaska, Inc.Operator Rep:Arthur
Rig Owner/Rig No.:Doyon 26 PTD#:2211160 DATE:12/19/2022
Type Operation:DRILL Annular:
250/3500Type Test:INIT
Valves:
250/5000
Rams:
250/5000
Test Pressures:Inspection No:bopRCN221221173514
Inspector Bob Noble
Inspector
Insp Source
Related Insp No:
INSIDE REEL VALVES:
Quantity P/F
(Valid for Coil Rigs Only)
Remarks:
Test Time 9
MASP:
3579
Sundry No:
Control System Response Time (sec)
Time P/F
Housekeeping:P
PTD On Location P
Standing Order Posted P
Well Sign P
Hazard Sec.P
Test Fluid W
Misc NA
Upper Kelly 1 P
Lower Kelly 1 P
Ball Type 1 P
Inside BOP 1 P
FSV Misc 0 NA
16 PNo. Valves
1 PManual Chokes
1 PHydraulic Chokes
0 NACH Misc
Stripper 0 none NA
Annular Preventer 1 18 3/4"P
#1 Rams 1 4 1/2" x 7 5/8 FP
#2 Rams 1 Blind/Shear P
#3 Rams 1 3 1/2" x 6 5/8 P
#4 Rams 0 none NA
#5 Rams 0 none NA
#6 Rams 0 none NA
Choke Ln. Valves 1 3 1/8"P
HCR Valves 2 3 1/16"P
Kill Line Valves 2 3" and 3 1/16 P
Check Valve 0 none NA
BOP Misc 0 none NA
System Pressure P2950
Pressure After Closure P1750
200 PSI Attained P25
Full Pressure Attained P77
Blind Switch Covers:PAll stations
Bottle precharge P
Nitgn Btls# &psi (avg)P10X 4000
ACC Misc NA0
P PTrip Tank
P PPit Level Indicators
P PFlow Indicator
P PMeth Gas Detector
P PH2S Gas Detector
NA NAMS Misc
Inside Reel Valves 0 NA
Annular Preventer P22
#1 Rams P17
#2 Rams P16
#3 Rams P18
#4 Rams NA0
#5 Rams NA0
#6 Rams NA0
HCR Choke P2
HCR Kill P2
FP
break in new rams as per NOV. F/P on top set of rams, had to increase Accu pressure to get them to hold. 10 min high tests
7\SHRI5HTXHVW $EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 5HSDLU:HOO 2SHUDWLRQVVKXWGRZQ
6XVSHQG 3HUIRUDWH 2WKHU6WLPXODWH 3XOO7XELQJ &KDQJH$SSURYHG3URJUDP
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 5HHQWHU6XVS:HOO $OWHU&DVLQJ 2WKHUBB1HZ'LUHFWLRQDO3ODQBB
2SHUDWRU1DPH &XUUHQW:HOO&ODVV 3HUPLWWR'ULOO1XPEHU
([SORUDWRU\ 'HYHORSPHQW
$GGUHVV6WUDWLJUDSKLF 6HUYLFH
$3,1XPEHU
,ISHUIRUDWLQJ:HOO1DPHDQG1XPEHU
:KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO"
:LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ" <HV 1R
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU )LHOG3RROV
&ROYLOOH5LEHU8QLW$OSLQH3RRO
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL 3OXJV0' -XQN0'
&DVLQJ &ROODSVH
6WUXFWXUDO
&RQGXFWRU
6XUIDFH
,QWHUPHGLDWH
3URGXFWLRQ
/LQHU
3DFNHUVDQG66697\SH 3DFNHUVDQG66690'IWDQG79'IW
$WWDFKPHQWV 3URSRVDO6XPPDU\ :HOOERUHVFKHPDWLF :HOO&ODVVDIWHUSURSRVHGZRUN
'HWDLOHG2SHUDWLRQV3URJUDP %236NHWFK ([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH
(VWLPDWHG'DWHIRU :HOO6WDWXVDIWHUSURSRVHGZRUN
&RPPHQFLQJ2SHUDWLRQV 2,/ :,1- :'63/6XVSHQGHG
9HUEDO$SSURYDO 'DWH *$6 :$* *6725 63/8*
$2*&&5HSUHVHQWDWLYH*,1-2S6KXWGRZQ $EDQGRQHG
&RQWDFW1DPH 0DWW1DJHO
0DWW1DJHO &RQWDFW(PDLO
&RQWDFW3KRQH
$XWKRUL]HG7LWOH 'ULOOLQJ(QJLQHHU
&RQGLWLRQVRIDSSURYDO1RWLI\$2*&&VRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
3OXJ,QWHJULW\ %237HVW 0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH
2WKHU
3RVW,QLWLDO,QMHFWLRQ0,75HT
G"<HV 1R
6SDFLQJ([FHSWLRQ5HTXLUHG"<HV 1R 6XEVHTXHQW)RUP5HTXLUHG
$33529('%<
$SSURYHGE\ &200,66,21(5 7+($2*&& 'DWH
&RPP &RPP 6U3HW(QJ 6U3HW*HR 6U5HV(QJ
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$2*&&86(21/<
PDWWEQDJHO#FRSFRP
7XELQJ*UDGH 7XELQJ0'IW3HUIRUDWLRQ'HSWK79'IW 7XELQJ6L]H
35(6(17:(//&21',7,216800$5<
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
$33/,&$7,21)25681'5<$33529$/6
$$&
$'/$'/$'/$$$'/
$'/$'/$'/$'/
32%R[$QFKRUDJH$ODVND
&RQRFR3KLOOLSV$ODVND,QF
&'
/HQJWK 6L]H 79' %XUVW0'
3HUIRUDWLRQ'HSWK0'IW
3HUIRUDWH
5HSDLU:HSDLU:HOO
([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH
%237HVW0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH
1R
1R
)RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO
By Samantha Carlisle at 8:06 am, Aug 30, 2022
'65
6)'
$'/$'/$'/$'/
$$$'/$'/6)'
6)'
6)'
%23 WHVW WR SVLJ
$QQXODU SUHYHQWHU WHVW WR SVLJ
;
)LOH ZLWK 37'
;
97/
127( $OO WKH QRWHV DQG FRQGLWLRQV RI DSSURYDO RQ WKH RULJLQDO
DSSURYHG 37' DSSO\ LQFOXGLQJ $2*&& QRWHV ZULWWHQ WKURXJKRXW WKH 37'
DQG LQ WKH 'ULOOLQJ SURFHGXUH
GWV -/&
Jeremy
Price
Digitally signed by
Jeremy Price
Date: 2022.09.14
14:06:20 -08'00'
RBDMS JSB 091422
&RQRFR3KLOOLSV$ODVND,QF
3RVW2IILFH%R[
$QFKRUDJH$ODVND
7HOHSKRQH
$XJXVW
$ODVND2LODQG*DV&RQVHUYDWLRQ&RPPLVVLRQ
:HVWWK$YHQXH6XLWH
$QFKRUDJH$ODVND
5H 6XQGU\IRU&58&''LUHFWLRQDODQG2SHUDWLRQDO&KDQJHV
'HDU6LURU0DGDP
&RQRFR3KLOOLSV$ODVND,QFKHUHE\DSSOLHVIRUDFKDQJHWRWKHDSSURYHG3HUPLWWR'ULOODQRQVKRUHSURGXFHUZHOOIURPWKH&'
GULOOLQJSDG7KHFKDQJHVLQFOXGHGDGLUHFWLRQDOFKDQJHDQGRSHUDWLRQDOXSGDWHVLQFOXGLQJPXGW\SHFKDQJHV7KHLQWHQGHGVSXGGDWHIRUWKLV
ZHOOLV'HFHPEHUXVLQJ'R\RQ5LJWRGULOOWKHZHOO
&'LVSODQQHGWREHDODWHUDO.XSDUXN&SURGXFHU7KH´6XUIDFHVHFWLRQZLOO7'DERYHWKH&VDQGDQGWKHQ´FDVLQJZLOOEHVHW
DQGFHPHQWHGWRVXUIDFH7KHLQWHUPHGLDWHKROHZLOOEHGULOOHGLQIRXUVHFWLRQVWRPLWLJDWHLVVXHVZLWKGULOOLQJWKHH[WHQGHGRYHUEXUGHQ
VHFWLRQ
7KH´[´,QWHUPHGLDWHVHFWLRQZLOOEHGULOOHGWR¶0'DQGODQGHGDWDQLQFOLQDWLRQRI$´OLQHUZLOOEHVHWDQG
FHPHQWHGIURP7'WRVHFXUHWKHVKRHLVRODWHWKH4DQQLNUHVHUYRLU7KH´[´,QWHUPHGLDWHVHFWLRQZLOOEHGULOOHGDW
LQFOLQDWLRQWKURXJKWKH$OELDQ7KH´FDVLQJZLOOEHVHWDQGFHPHQWHGWR¶79'DERYHWKHVKRH7KH´[´
,QWHUPHGLDWHVHFWLRQZLOOEHGULOOHGDWLQFOLQDWLRQWR¶79'LQWRWKH+5=0DQDJHG3UHVVXUH'ULOOLQJWHFKQRORJ\ZLOOEHXWLOL]HGWR
PLWLJDWHZHOOERUHLQVWDELOLW\DQGORVWFLUFXODWLRQDFURVVWKLVLQWHUYDO$´OLQHUZLOOEHVHWDQGFHPHQWHGWR¶79'DERYHWKHVKRH
7KHò´[ó´GULOOHGWKURXJKWKH+5=DQG.DOXELNDQGZLOOODQGZLWKLQWKH.XSDUXN&WDUJHWUHVHUYRLU$´OLQHUZLOOEHVHWDQG
FHPHQWHGWR¶0'DERYHWKHWRS.XSDUXN&0DQDJHG3UHVVXUH'ULOOLQJWHFKQRORJ\ZLOOEHXWLOL]HGWRPLWLJDWHZHOOERUHLQVWDELOLW\DQG
ORVWFLUFXODWLRQDFURVVWKLVLQWHUYDO
7KH´3URGXFWLRQVHFWLRQZLOOEHJHRVWHHUHGZLWKLQWKH.XSDUXN&WDUJHWUHVHUYRLUZLWK7'SRWHQWLDOO\EHLQJDGMXVWHGDVSHUUHVHUYRLU
H[WHQWDQGTXDOLW\7KHZHOOZLOOEHFRPSOHWHGDVDSURGXFHU$´SUHSHUIRUDWHGOLQHUZLOOEHVHWDQGWKHZHOOZLOOEHFRPSOHWHGZLWKD
WDSHUHG´[´WXELQJXSSHUFRPSOHWLRQVWULQJ
3OHDVHILQGDWWDFKHGWKHLQIRUPDWLRQUHTXLUHGE\$&&DDQGFIRU\RXUUHYLHZ3HUWLQHQWLQIRUPDWLRQDWWDFKHGWRWKLV
DSSOLFDWLRQLQFOXGHVWKHIROORZLQJ
)RUP
$SURSRVHGGULOOLQJSURJUDP
$SURSRVHGFRPSOHWLRQGLDJUDP
$GULOOLQJIOXLGVSURJUDPVXPPDU\
3UHVVXUHLQIRUPDWLRQDVUHTXLUHGE\$&&G
'LUHFWLRQDOGULOOLQJFROOLVLRQDYRLGDQFHLQIRUPDWLRQDVUHTXLUHGE\$&&E
,QIRUPDWLRQSHUWLQHQWWRWKHDSSOLFDWLRQWKDWLVSUHVHQWO\RQILOHDWWKH$2*&&
'LDJUDPVRIWKH%23HTXLSPHQWGLYHUWHUHTXLSPHQWDQGFKRNHPDQLIROGOD\RXWDVUHTXLUHGE\$&&D
DQGE
$GHVFULSWLRQRIWKHGULOOLQJIOXLGVKDQGOLQJV\VWHP
'LDJUDPRIULVHUVHWXS
,I\RXKDYHDQ\TXHVWLRQVRUUHTXLUHIXUWKHULQIRUPDWLRQSOHDVHFRQWDFW0DWW:LHQVDW
0DWW5:LHQV#&RQRFR3KLOOLSVFRPRU&KULV%ULOORQDW
6LQFHUHO\ FF
&':HOO)LOH-HQQD7D\ORU$72
'DYLG/HH$72
&KULV%ULOORQ $72
0DWW:LHQV/D\OD8QJHU$72
6HQLRU'ULOOLQJ(QJLQHHU*UHJ+REEV$72
$QG\0DFN.XXNSLN&RUS
LVRODWHWKH4DQQLNUHVHUYRLU
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 1 of 23 Printed: 25-Aug-22
&'
AOGCC Application for Permit to Drill Document
7DEOHRI&RQWHQWV
:HOO1DPH(Requirements of 20 AAC 25.005 (f)) ....................................................................................
/RFDWLRQ6XPPDU\(Requirements of 20 AAC 25.005(c)(2))
%ORZRXW3UHYHQWLRQ(TXLSPHQW,QIRUPDWLRQ(Requirements of 20 AAC 25.005(c)(3))
'ULOOLQJ+D]DUGV,QIRUPDWLRQRequirements of 20 AAC 25.005 (c)(4))
3URFHGXUHIRU&RQGXFWLQJ)RUPDWLRQ,QWHJULW\7HVWV
Requirements of 20 AAC 25.005 (c)(5))
&DVLQJDQG&HPHQWLQJ3URJUDP(Requirements of 20 AAC 25.005(c)(6))
'LYHUWHU6\VWHP,QIRUPDWLRQ(Requirements of 20 AAC 25.005(c)(7))
'ULOOLQJ)OXLG3URJUDPRequirements of 20 AAC 25.005(c)(8))
$EQRUPDOO\3UHVVXUHG)RUPDWLRQ,QIRUPDWLRQ(Requirements of 20 AAC 25.005 (c)(9))
6HLVPLF$QDO\VLV(Requirements of 20 AAC 25.005 (c)(10)
6HDEHG&RQGLWLRQ$QDO\VLV(Requirements of 20 AAC 25.005 (c)(11))
(YLGHQFHRI%RQGLQJ(Requirements of 20 AAC 25.005 (c)(12))
3URSRVHG'ULOOLQJ3URJUDP(Requirements of 20 AAC 25.005 (c)(13))
'LVFXVVLRQRI0XGDQG&XWWLQJV'LVSRVDODQG$QQXODU'LVSRVDO
(Requirements of 20 AAC 25.005 (c)(14))
$WWDFKPHQWV
Attachment 1 Cement Summary
Attachment 2 Drilling Hazards Summary
Attachment 3 Completion Schematic
Attachment 4 Property Plat
Attachment 5 Directional Plan CD2-361
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 2 of 23 Printed: 25-Aug-22
:HOO1DPH(Requirements of 20 AAC 25.005 (f))
7KHZHOOIRUZKLFKWKLVDSSOLFDWLRQLVVXEPLWWHGZLOOEHGHVLJQ DWHGDV&58&'
/RFDWLRQ6XPPDU\(Requirements of 20 AAC 25.005(c)(2))
/RFDWLRQDW6XUIDFH(CD2-361 Slot)µ)1/
)(/6HF715(80
NAD27
Northings: 5,974,180
Eastings: 371,464
RKB Elevation ¶$06/
Pad Elevation ¶$06/
/RFDWLRQDW3URGXFWLYH+RUL]RQ+HHO
)1/
)(/6HF715(80
NAD27
Northings:5,981,348
Eastings: 369,237
Measured Depth, RKB: ¶
Total Vertical Depth, RKB: ¶
Total Vertical Depth, SS: ¶
/RFDWLRQDW7RWDO'HSWK7RH
)1/
)(/6HF715(80
NAD27
Northings: 6,001,839
Eastings: 359,331
Measured Depth, RKB: ¶
Total Vertical Depth, RKB: ¶
Total Vertical Depth, SS: ¶
Requirements of 20 AAC 25.050(b)
3OHDVHVHH$WWDFKPHQW&'ZS'LUHFWLRQDO3ODQ
7KH$SSOLFDQWLVWKHRQO\DIIHFWHGRZQHU
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 3 of 23 Printed: 25-Aug-22
&'3DG/D\RXW
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 4 of 23 Printed: 25-Aug-22
&':HOO3ODW
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 5 of 23 Printed: 25-Aug-22
%ORZRXW3UHYHQWLRQ(TXLSPHQW,QIRUPDWLRQ(Requirements of 20 AAC 25.005(c)(3))
3OHDVHUHIHUHQFH%23DQGGLYHUWHUVFKHPDWLFVRQILOHIRU'R\RQ
'ULOOLQJ+D]DUGV,QIRUPDWLRQRequirements of 20 AAC 25.005 (c)(4))
7KHIROORZLQJVKRZVWKHFDOFXODWLRQUHVXOWVRIDQWLFLSDWHGVXUIDFHSUHVVXUH$63ZKLOHGULOOLQJWKLVZHOO
&DVLQJ6L]H
LQ
&DVLQJ6HW'HSWK
0'79'IW
)UDFWXUH
*UDGLHQW
SSJ
3RUH
3UHVVXUH
SVL
$63'ULOOLQJ
SVL
1$
352&('85()25&$/&8/$7,1*$17,&3$7('685)$&(35(6685($63
$63LVGHWHUPLQHGDVWKHOHVVHURIVXUIDFHSUHVVXUHDWEUHDNGRZQRIWKHIRUPDWLRQFDVLQJVHDWZLWKD
JDVJUDGLHQWWRWKHVXUIDFHRUIRUPDWLRQSRUHSUHVVXUHDWWKHQH[WFDVLQJSRLQWOHVVDJDVJUDGLHQWWR
WKHVXUIDFHDVIROORZV
$63 >)*[@['
:KHUH $63 $QWLFLSDWHG6XUIDFHSUHVVXUHLQSVL
)* )UDFWXUHJUDGLHQWDWWKHFDVLQJVHDWLQOEJDO
&RQYHUVLRQIURPOEJDOWRSVLIW
*DVJUDGLHQWLQSVLIW
' WUXH9HUWLFDOGHSWKRIFDVLQJVHDWLQIW5.%
25
$63 )33±['
:KHUH )33 )RUPDWLRQ3RUH3UHVVXUHDWWKHQH[WFDVLQJSRLQW
)33 SVLIW[79'DERYH+5= SVLIWEHORZ+5=XQOHVVRWKHUZLVHVSHFLILHG
(A) ASP Calculations Per Interval
'ULOOLQJ%HORZ´&RQGXFWRU
$63 >)*[±@['
>[±@[ SVL
25
$63 )33±['
±[ SVL
'ULOOLQJ%HORZ´6XUIDFH&DVLQJ
$63 >)*[±@['
>[±@[¶ SVL
25
$63 )33±['
±[¶ SVL
1RWH33LVDVVXPHGIRU4DQQLNDWSSJWKLVLVZRUVWFDVH
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 6 of 23 Printed: 25-Aug-22
'ULOOLQJ%HORZ´,QWHUPHGLDWH'ULOOLQJ/LQHU
$63 >)*[±@['
>[±@[¶ SVL
25
$63 )33±['
±[¶ SVL
'ULOOLQJ%HORZ´,QWHUPHGLDWH3URGXFWLRQ/LQHU
$63 >)*[±@['
>[±@[ SVL
25
$63 )33±['
±[ SVL
'ULOOLQJ%HORZ´,QWHUPHGLDWH3URGXFWLRQ/LQHU
$63 >)*[±@['
>[±@[ SVL
25
$63 )33±['
±[ SVL
NOTE: 10.5ppg Kuparuk C Pressure at TD
(B) data on potential gas zones;
7KHZHOOERUHLVQRWH[SHFWHGWRSHQHWUDWHDQ\K\GUDWHVQRUJDV]RQHV
(C) data concerning potential causes of hole problems such as abnormally geo-pressured strata,
lost circulation zones, and zones that have a propensity for differential sticking;
3OHDVHVHH$WWDFKPHQW'ULOOLQJ+D]DUGV6XPPDU\
3URFHGXUHIRU&RQGXFWLQJ)RUPDWLRQ,QWHJULW\7HVWVRequirements of 20 AAC 25.005 (c)(5))
'ULOORXWFDVLQJRUOLQHUVKRHDQGSHUIRUP/27WHVWRU),7LQDFFRUGDQFHZLWKWKH&23(5'/27),7
SURFHGXUHWKDW&RQRFR3KLOOLSV$ODVNDKDVRQILOHZLWKWKH&RPPLVVLRQ
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 7 of 23 Printed: 25-Aug-22
&DVLQJDQG&HPHQWLQJ3URJUDP(Requirements of 20 AAC 25.005(c)(6))
&DVLQJDQG&HPHQWLQJ3URJUDP
Csg/Tbg
OD (in)
Hole
Size (in)
Weight
(lb/ft) Grade Conn. Length
(ft)
Top MD/TVD
(ft)
Btm MD/TVD
(ft) Planned Cement Program
;:HOGHG&HPHQWHGWR6XUIDFHZLWK
\GVVOXUU\
/+\GULO
:
&HPHQWWR6XUIDFHZLWK
V['HHS&5(7(/HDGDWSSJ
V[&ODVV*7DLODWSSJ
[
3
,&
+\GULO
:V[([WHQGHG&ODVV*/HDGDWSSJ
V[&ODVV*7DLODWSSJ
[
/
,&
+\GULO
:V[&ODVV*7DLODWSSJ
[
/+\GULO
:V[&ODVV*7DLODWSSJ
ò[
/+\GULO
:V[&ODVV*7DLODWSSJ
QD/+\GULO
:N/A – Upper Part of Tapered Upper
Completion Tubing String
QD/+\GULO
:N/A – Lower Part of Tapered Upper
Completion Tubing String
/+\GULO
:N/A – Uncemented Open Hole Liner w/
Pre-Perforated Pup Joints
'LYHUWHU6\VWHP,QIRUPDWLRQ(Requirements of 20 AAC 25.005(c)(7))
&3$,UHTXHVWVDYDULDQFHWRWKHGLYHUWHUUHTXLUHPHQWXQGHU$$&KEHJUDQWHG
&'PHHWVWKHUHTXLUHPHQWVDVRXWOLQHGEHORZ
1. The well is a development well drilled by Doyon 26 from an existing drill site.
D &'LVDGHYHORSPHQWZHOOEHLQJGULOOHGE\'R\RQIURP &'
2. At least one previously drilled borehole has penetrated the horizontal circle with a radius of 500
feet centered on the proposed location of the surface casing shoe of the well to be drilled.
D 7KHUHDUHHLJKWZHOOVZLWKLQD¶UDGLXVRIWKHSURSRVHG&'VXUIDFHVKRHDW
¶0'&'a¶&'a¶&'a¶&'a¶&'
a¶&'a¶&'a¶DQG&'a¶
3. There have been no significant gas shows or well control events while any borehole was drilled to
the depth of the surface casing shoe within the 500-foot radius circle.
D 7KHUHDUHILIW\WKUHHZHOOVZLWKLQD¶UDGLXVDFURVVWKH&'VXUIDFHKROHLQWHUYDO
7KHUHKDYHEHHQQRVLJQLILFDQWLQGLFDWLRQVRIVKDOORZJDVRUJDVK\GUDWHVZKLOHGULOOLQJ
IURP&'SDGLQFOXGLQJRQ&'ZKHUHDVXUIDFHKROHZDVGULO OHGWR¶79'LQ
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 8 of 23 Printed: 25-Aug-22
'ULOOLQJ)OXLG3URJUDPRequirements of 20 AAC 25.005(c)(8))
6XUIDFH,QWHUPHGLDWH
,QWHUPHGLDWH
,QWHUPHGLDWH
,QWHUPHGLDWH
3URGXFWLRQ
+ROH6L]Hin [[
[
[
&DVLQJ
6L]Hin
'HQVLW\ppg ±± ±±
39cP ±± ±
<3
lb./
100
ft2
±±±±
,QLWLDO
*HOV
lb./
100
ft2
0LQXWH
*HOV
lb./
100
ft2
$3,)OXLG
/RVV
cc/
30
min
1&±
± ±
S+±±±±
6XUIDFH+ROH
7KH6XUIDFHLQWHUYDOZLOOEHGULOOHGZLWKDPL[HGPHWDOR[LGHIUHVKZDWHUGULOOLQJIOXLG'5,/3/(;:%0
.HHSIORZOLQHYLVFRVLW\DWrVHFTWZKLOHGULOOLQJDQGUXQQLQJFDVLQJ5HGXFHYLVFRVLW\SULRUWR
FHPHQWLQJ0DLQWDLQPXGZHLJKWSSJWKURXJKWKHEDVHRI3HUPDIURVWDQGLQFUHDVHWRSSJSULRU
WR7'&RQWURO/*6XVLQJVROLGVFRQWUROV\VWHPDQGGLOXWLRQVZKHUHQHFHVVDU\
,QWHUPHGLDWH
7KH,QWHUPHGLDWHLQWHUYDOZLOOEHGULOOHGZLWKDIUHVKZDWHUJHOSRO\PHUGULOOLQJIOXLG/61':%0
(QVXUHJRRGKROHFOHDQLQJE\PD[LPL]LQJIOXLGDQQXODUYHORFLW\DQGURWDU\VSHHG0DLQWDLQPXGZHLJKW
IURP±SSJIRUVKDOORZLQVWDELOLW\DQGEHSUHSDUHGWRDGGORVVFLUFXODWLRQPDWHULDORUZHLJKWXS
DVQHHGHGIRUDFWXDO4DQQLNSRUHSUHVVXUH*RRGILOWHUFDNHTXDOLW\KROHFOHDQLQJDQGPDLQWHQDQFHRI
ORZJUDYLW\GULOOVROLGVE\GLOXWLQJDVUHTXLUHGZLOODOOEHLPSRUWDQWLQPDLQWDLQLQJJRRGKROHFRQGLWLRQV
,QWHUPHGLDWH
7KH,QWHUPHGLDWHLQWHUYDOZLOOEHGULOOHGZLWKDIUHVKZDWHUJHOSRO\PHUGULOOLQJIOXLG/61':%0
(QVXUHJRRGKROHFOHDQLQJE\PD[LPL]LQJIOXLGDQQXODUYHORFLW\DQGURWDU\VSHHG0DLQWDLQPXGZHLJKW
IURP±SSJIRULQVWDELOLW\03'PD\EHXVHGWRSUHYHQWF\FOLQJRQWKHIRUPDWLRQ*RRGILOWHUFDNH
TXDOLW\KROHFOHDQLQJDQGPDLQWHQDQFHRIORZJUDYLW\GULOOVRO LGVE\GLOXWLQJDVUHTXLUHGZLOODOOEH
LPSRUWDQWLQPDLQWDLQLQJJRRGKROHFRQGLWLRQV
,QWHUPHGLDWH
7KH,QWHUPHGLDWHLQWHUYDOZLOOEHGULOOHGZLWKIUHVKZDWHUJHOSRO\PHUGULOOLQJIOXLG/61':%0WR
SURSHUO\FRQGLWLRQWKHKROHIRUWKHIORDWHGOLQHUUXQ(QVXUHJRRGKROHFOHDQLQJE\PD[LPL]LQJIOXLGDQQXODU
YHORFLW\DQGDGMXVWLQJGULOOLQJSDUDPHWHUV&RQGLWLRQWKHPXGX VLQJGLOXWLRQVDVUHTXLUHGWRPDLQWDLQORZ
JUDYLW\GULOOVROLGV:HLJKWXSWRSSJDW7'DQGDGMXVWWULSSLQJSDUDPHWHUVWRHQVXUHFOHDQKROH
SULRUWRIORDWLQJWKH´OLQHUWRERWWRP03'ZLOOXVHGRQWKLVKROHVHFWLRQWRPLQLPL]HF\FOLQJDQG
LPSURYHLQVWDELOLW\
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 9 of 23 Printed: 25-Aug-22
,QWHUPHGLDWH
7KH,QWHUPHGLDWHLQWHUYDOZLOOEHGULOOHGZLWKDQV\QWKHWLFEDVHGPXG1$)6%0WRPLWLJDWHZHOOERUH
LQVWDELOLW\DQGWRSURSHUO\FRQGLWLRQWKHKROHIRUWKHOLQHUUXQ(QVXUHJRRGKROHFOHDQLQJE\PD[LPL]LQJ
IOXLGDQQXODUYHORFLW\7KHUHLVSRWHQWLDOIRUORVWFLUFXODWLRQVRHQVXUHDGHTXDWH/&0PDWHULDOLVDYDLODEOH
RQORFDWLRQWRDGGUHVVDQ\XQH[SHFWHGORVVHV*RRGILOWHUFDNHTXDOLW\KROHFOHDQLQJDQGPDLQWHQDQFH
RIORZJUDYLW\GULOOVROLGVE\GLOXWLQJDVUHTXLUHGZLOODOOEHLPSRUWDQWLQPDLQWDLQLQJJRRGKROHFRQGLWLRQV
0LWLJDWHZHOOERUHLQVWDELOLW\ZLWK03'WDUJHWLQJaSSJ(0:DQG/RZHU6KDOHVSHFLILFPXGDGGLWLYHV
:HLJKWXSDVQHHGHGDW´VKRHWRWKHJUHDWHURISSJ(0:IRUZHOOERUHLQVWDELOLW\PLWLJDWLRQ
RUDVQHHGHGIRU.XSDUXN&SRUHSUHVVXUH
3URGXFWLRQ+ROH
7KH3URGXFWLRQLQWHUYDOZLOOEHGULOOHGZLWKDZDWHUEDVHGGULOOLQIOXLG)/2352:%0ZHLJKWHG
DSSURSULDWHO\VRWKDW03'FDQSURYLGHDG\QDPLFRYHUEDODQFHRIaSSJ(0:ZKLOHUHGXFLQJWKHULVN
RIORVWFLUFXODWLRQFUHDWHGE\KLJK(&'V7KHUHLVSRWHQWLDOIRUORVWFLUFXODWLRQVRHQVXUHDGHTXDWH/&0
PDWHULDOLVDYDLODEOHRQORFDWLRQWRDGGUHVVDQ\ORVVHV7KHUHLVDSRWHQWLDOIRUDEQRUPDOSUHVVXUHVR
HQVXUHDGHTXDWHZHLJKWLQJPDWHULDOLVRQORFDWLRQWRZHLJKWXSDVQHHGHG.LOOZHLJKWEULQHZLOOEHSODFHG
LQWKHZHOOSULRUWRSXOOLQJRXWRIKROH
3OHDVHUHIHUHQFHSLWGLDJUDPRQILOHIRU'R\RQ$OOGULOOLQJIOXLGSUDFWLFHVZLOOEHLQDFFRUGDQFHZLWK
DSSURSULDWHUHJXODWLRQVVWDWHGLQ$$&
$EQRUPDOO\3UHVVXUHG)RUPDWLRQ,QIRUPDWLRQ(Requirements of 20 AAC 25.005 (c)(9))
1$$SSOLFDWLRQLVQRWIRUDQH[SORUDWRU\RUVWUDWLJUDSKLFWHVWZHOO
6HLVPLF$QDO\VLV(Requirements of 20 AAC 25.005 (c)(10)
1$$SSOLFDWLRQLVQRWIRUDQH[SORUDWRU\RUVWUDWLJUDSKLFWHVWZHOO
6HDEHG&RQGLWLRQ$QDO\VLV(Requirements of 20 AAC 25.005 (c)(11))
1$$SSOLFDWLRQLVQRWIRUDQRIIVKRUHZHOO
(YLGHQFHRI%RQGLQJ(Requirements of 20 AAC 25.005 (c)(12))
(YLGHQFHRIERQGLQJIRU&RQRFR3KLOOLSV$ODVND,QFLVRQILOHZLWKWKH&RPPLVVLRQ
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 10 of 23 Printed: 25-Aug-22
3URSRVHG'ULOOLQJ3URJUDP(Requirements of 20 AAC 25.005 (c)(13))
7KHSURSRVHGGULOOLQJSURJUDPLVOLVWHGEHORZ3OHDVHUHIHUWR&RPSOHWLRQ6FKHPDWLF
0,58'R\RQRQWR&58&'RYHUSUHLQVWDOOHG´[´LQVXODWHGFRQGXFWRU
'HZDWHUFHOODUULJXSULVHU WHVWVDPH
3LFNXSHQRXJK´9;GULOOSLSHWRGULOO685)VHFWLRQDQGUDFNEDFN
0DNHXS´&RQGXFWRU&OHDQ2XW%+$&OHDQRXWFRQGXFWRU
0DNHXS´685)'ULOOLQJ%+$(LMWD Program: GR/DIR)VSXGZHOO GLUHFWLRQDOO\GULOO´KROHWR
685)7'HVWLPDWHGDW¶0'¶79'WRSVHWWLQJWKH&DQGDVSHUWKHGLUHFWLRQDOSODQ
±SSJ'5,/3/(;:%0ZLOOEHXVHGWRGULOOWKHVHFWLRQ
&LUFXODWH FRQGLWLRQIORZFKHFNZHOODQG322+/D\GRZQ685)'ULOOLQJ%+$
5XQQHZ´/716(5685)FDVLQJFHQWUDOL]HGDVSHUGHVLJQWRVHFWLRQ7'&LUFXODWH FRQGLWLRQ
ODQGFDVLQJRQKDQJHUZLWKLQZHOOKHDGDQGEDFNRIIXSSHUKDOIRIODQGLQJMRLQW
3LFNXS 7,+ZLWKWKH685),QQHU6WULQJ%+$VWDELQWRWKHLQQHUVWULQJIORDWFROODUDQGHVWDEOLVKFLUFXODWLRQ
&HPHQWWKH´685)FDVLQJWRVXUIDFHDVSHUWKHFHPHQWSURJUDPZLWK¶RISSJ&ODVV*WDLODQG
SSJ'HHS&5(7(OHDGWRVXUIDFH%XPSLQQHUVWULQJGDUWVEOHHGSUHVVXUH FKHFNIORDWV
a. CONTINGENCY: If cement is not brought to surface, notify AOGCC and prepare for top job.
)ORZFKHFNZHOO1'IORZULVHU 18+35LVHU %23(ZLWKWKHIROORZLQJHTXLSPHQWFRQILJXUDWLRQ
D ´$QQXODU8SSHU´[´9%5%OLQG6KHDU5DP/RZHU´[´9%5
7HVW%23(WRSVLORZSVLKLJK7HVWDQQXODUWRSVLORZSVLKLJK(Provide 48 hr. AOGCC
notice)
3LFNXS 7,+ZLWKWKH´[´,1750'ULOOLQJ%+$(LMWD Program: GR/RES/DIR)
a. CONTINGENCY: If unable to clean-out SURF casing shoe track with INTRM1 Drilling BHA, drill out
SURF casing shoe track with dedicated SURF Casing Clean-Out BHA and perform FIT.
&KDUW´685)FDVLQJSUHVVXUHWHVWWRSVLIRUPLQXWHV
'ULOORXWVKRHWUDFN´UDWKROHDQG¶RIQHZKROH&LUFXODWH FRQGLWLRQ
3HUIRUP),7WRPLQLPXPSSJ(0:
'LVSODFHZHOOWRSSJ/61':%0
'LUHFWLRQDOO\GULOO´,17503LORW+ROHXQWLOWKHXQGHUUHDPHULVEHORZWKH´685)&DVLQJ6KRHDQGRSHQ
WKHXQGHUUHDPHU
'LUHFWLRQDOO\GULOO´[´,1750+ROHSDVWWKH%DVH4DQQLN&LUFXODWHDPLQLPXP[ERWWRP¶VXSDQGIORZ
FKHFNWKHZHOOWRGHWHUPLQHLIDGGLWLRQDORYHUEDODQFHLVQHHGHG
'LUHFWLRQDOO\GULOO´[´,1750+ROHWR,17507'DW¶0'¶79'DVSHUWKH
GLUHFWLRQDOSODQ&LUFXODWH FRQGLWLRQZKLOHZHLJKWLQJXSDVQ HHGHGIRUDWULSPDUJLQ
2EVHUYHZHOOIRUIORZ
322+DQGOD\GRZQWKH´,1750'ULOOLQJ%+$
&KDQJH8SSHU´[´9%5VWR´6ROLG%RG\5DPV7HVWVDPHWRSVLORZSVLKLJK(Provide
48 hr. AOGCC notice)
5XQQHZ´3,&76+OLQHUFHQWUDOL]HGDVSHUGHVLJQ&LUFXODWH FRQGLWLRQSULRUWRH[LWLQJWKH
685)&DVLQJ6KRHDQGDJDLQEHIRUHPDNLQJXSWKH/LQHU+DQJHU
08WKH´[´,1750/LQHU+DQJHU5XQQLQJ7RRO$VVHPEO\DQG7,+ZLWKWKH´,1750OLQHUWRDERYH
UDWKROH2QFHWKHUHFLUFXODWH FRQGLWLRQDVQHHGHGLQSUHSDUDWLRQIRUWKHFHPHQWMRE
&HPHQWWKH´,1750OLQHUZLWKVXIILFLHQWSSJ([WHQGHG&ODVV*OHGWRSURYLGH¶LVRODWLRQDERYHWKH
7RS4DQQLNDQGD¶SSJWDLOWRWDFNWKH´,1750/LQHU6KRH%XPSSOXJVWRSVLRYHUFLUFXODWLQJ
SUHVVXUHEOHHGSUHVVXUH FKHFNIORDWV
a. CONTINGENCY: If cement is not circulated above the Qannik, drill, case, cement INTRM2. Intrm 1 is a
drilling liner and will be covered by Intrm 2 long string.
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 11 of 23 Printed: 25-Aug-22
6HWWKH´[´7,:;3$./LQHU+DQJHU3HUIRUPRYHUSXOOWHVWWRFRQILUPKDQJHUVHW
3HUIRUP/LQHU7RSWHVWWRSVL
3LFNXSWRUHOHDVHUXQQLQJWRROVIURP/LQHU+DQJHU&LUFXODWH FRQGLWLRQ)ORZFKHFNZHOO
72+RQHOHYDWRUV/D\GRZQ,1750/LQHU5XQQLQJ7RROV
&KDQJH´6ROLG%RG\5DPVEDFNWR´[´9%5V7HVWVDPHWRSVL(Provide 48 hr.
AOGCC notice)
3LFNXS 7,+ZLWK´,1750&OHDQ2XW%+$WRWKH´,1750/LQHUWRS
&LUFXODWH FRQGLWLRQGULOORXWSDFNRIIEXVKLQJEHORZ/LQHU+DQJHUFLUFXODWHERWWRP¶VXSDQGFRQWLQXH7,+
&KDUW´FDVLQJ[´OLQHUSUHVVXUHWHVWWRSVLIRUPLQXWHV
'ULOORXWVKRHWUDFN´[´UDWKROHDQG¶RIô´QHZKROH&LUFXODWH FRQGLWLRQ
3HUIRUP),7WRPLQLPXPSSJ(0:
&LUFXODWH FRQGLWLRQREVHUYHZHOOIRUIORZDQG72+/D\GRZQWKH´,1750&OHDQ2XW%+$
3LFNXS 7,+ZLWK´[´,1750'ULOOLQJ%+$WRWKH´,1750/LQHU6KRH(LMWD Program:
GR/RES/DIR)
'LVSODFHWKHZHOOWRSSJ/61':%0
2SHQXQGHUUHDPHUDQGGLUHFWLRQDOO\GULOO´[´,1750KROHWR7'DW¶0'
D 7KLVKROHVHFWLRQLVWKHXSSHUSDUWRIWKHRULJLQDOVWULQJ,17KROHVHFWLRQWKHGULOOLQJWULSSLQJRXWWLPH
LVHVWLPDWHGWREHRYHUGD\V7RDYRLGWKHKLJKULVNRIVWXFNSLSH&RQRFR3KLOOLSVLVUHTXHVWLQJWR
FRQWLQXHWKHDSSURYHG(YHQW%DVHG%23WHVWLQJVFKHGXOHIURPRULJLQDO,173HUIRUPIXOO%23WHVW
RQFH%+$RXWRIKROH
322+DQGOD\GRZQ´[´,1750'ULOOLQJ%+$
&KDQJH8SSHU´[´9%5VWR´6ROLG%RG\5DPV7HVWVDPHWRSVLORZSVLKLJK
(Provide 48 hr. AOGCC notice)
)ORDWQHZ´/,&76+,1750&DVLQJFHQWUDOL]HGDVSHUGHVLJQWR7'DWWHPSWWRUXQRQ
HOHYDWRUVDQGURWDWHRQO\LIQHHGHGWRPRYHSDVWDOHGJHRUWREUHDND[LDOIULFWLRQ
&LUFXODWH FRQGLWLRQLQSUHSDUDWLRQIRUWKHFHPHQWMRE
&HPHQWWKH´,1750OLQHUZLWKVXIILFLHQWSSJ&ODVV*WRWDFNWKH,1750FDVLQJVKRHZLWK¶79'
VOXUU\
,QVWDOOSDFNRIIDQGGLVSODFHWKH´[´[´DQQXOXVWRFRUURVLRQLQKLELWHGVHDZDWHUDQGGLHVHOIUHH]H
SURWHFW
&KDQJH´VROLGERG\UDPVEDFNWR´[´9%5V7HVWVDPHWRSVL(Provide 48 hr.
AOGCC notice)
3LFNXS 7,+ZLWK´[´,1750'ULOOLQJ%+$(LMWD Program: GR/RES/NEU/DEN/SON/DIR)
&KDUW´,1750FDVLQJSUHVVXUHWHVWWRSVLIRUPLQXWHV
'ULOORXWVKRHWUDFN´[´UDWKROHDQG¶RIQHZ´KROH
3HUIRUP),7WRPLQLPXPSSJ(0:
'LVSODFHZHOOWRSSJ/61':%0
'LUHFWLRQDOO\GULOO[´QHZ,1750KROHWR7'¶79'EHORZWKH7RS+5=HVWLPDWHGDW¶0'
¶79'
D 7KLVKROHVHFWLRQLVWKHORZHUSDUWRIWKHRULJLQDOVWULQJ,17KROHVHFWLRQWKHGULOOLQJWULSSLQJRXWWLPH
LVHVWLPDWHGWREHRYHUGD\V7RDYRLGWKHKLJKULVNRIVWXFNSLSH&RQRFR3KLOOLSVLVUHTXHVWLQJWR
FRQWLQXHWKHDSSURYHG(YHQW%DVHG%23WHVWLQJVFKHGXOHIURPRULJLQDO,173HUIRUPIXOO%23WHVW
RQFH%+$RXWRIKROH
&LUFXODWH FRQGLWLRQKROHZKLOHZHLJKWLQJXSWRSSJ2EVHUYHZHOOIRUIORZ
322+DQGOD\GRZQ[´,1750'ULOOLQJ%+$
&KDQJH8SSHU´[´9%5VWR´6ROLG%RG\5DPV7HVWVDPHWRSVLORZSVLKLJK
(Provide 48 hr. AOGCC notice)
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 12 of 23 Printed: 25-Aug-22
)ORDW´/76+QHZ,1750/LQHUFHQWUDOL]HGDVSHUGHVLJQWR7'&HPHQWWKHVDPHZLWK
SSJ&ODVV*WR¶79'DERYHWKHVKRH
6HWWKH/LQHU+DQJHU7HVWWKHEDFNVLGHWRSVLIRULQWHJULW\
322+DQG/'OLQHUKDQJHUUXQQLQJWRRO
&KDQJH8SSHUEDFNWR´[´9%5V7HVWVDPHWRSVLORZSVLKLJK(Provide 48 hr. AOGCC
notice)
3UHVVXUHWHVWVWKH´OLQHUDQG´FDVLQJWRSVLIRUPLQXWHV
3LFNXS 7,+ZLWK´[´,1750'ULOOLQJ%+$(LMWD Program: GR/RES/NEU/DEN/SON/DIR)
D 72&ZLOOEHORJJHGZLWK6RQLFWRRO
'LVSODFHZHOOWRSSJ1$)6%0
'ULOORXWVKRHWUDFNDQG¶RIQHZKROH3HUIRUP),7WRPLQLPXPSSJ(0:
'LUHFWLRQDOO\GULOO´[´KROHWRVHFWLRQ7'ZLWKLQWKH)LRUG:HVW.XSDUXN&DW¶0'¶79'
XVLQJ03'WRWDUJHWSSJ(0:DW¶79'
622+WR´VKRH
&LUFXODWH ZHLJKWXSWKHPXGWRSSJNLOOZHLJKW1$)6%0
)ORZFKHFN622+DQGOD\GRZQ´[´'ULOOLQJ%+$
5XQQHZ´/76+,1750/LQHUWR7'
&HPHQWWKH´OLQHUZLWKSSJWDLO&ODVV*WR¶79'DERYHWKHWRSRI.XSDUXN&UHVHUYRLU
6HWOLQHUKDQJHUDQGSHUIRUPSVLEDFNSUHVVXUHWHVW
322+DQG/'OLQHUKDQJHUUXQQLQJWRRO
3UHVVXUHWHVW´[´[´/LQHUSUHVVXUHWHVWWRSVLIRUPLQXWHV
3LFNXS 7,+ZLWK´352''ULOOLQJ$VVHPEO\(LMWD Program: GR/RES/NEU/DEN/DIR)
'LVSODFHZHOOWRQHZSSJ)/2352:%0
'ULOORXWVKRHWUDFN´[´UDWKROHDQG¶RIQHZKROH3HUIRUP),7WRPLQLPXPRISSJ(0:
3HUIRUPGUDZGRZQ:HLJKWXSPXGWRDERYHSRUHSUHVVXUH
'LUHFWLRQDOO\GULOOKROHWRWKH3URGXFWLRQ7'DW¶0'JHRVWHHULQJWRVWD\ZLWKLQWKH.XSDUXN&ZKLOH
XVLQJ03'WRWDUJHW(0:DW´6KRH
&LUFXODWH FRQGLWLRQ%522+WRWKH´,1750OLQHUVKRHDQGIXUWKHUDVQHHGHGWRFOHDQ XSWKHZHOO
6WULSLQEDFNWRERWWRP
&LUFXODWH FRQGLWLRQGLVSODFHZHOOWRNLOOZHLJKWEULQHIORZFKHFN 72+/D\GRZQ´352''ULOOLQJ%+$
5XQQHZ´/76+/LQHUZLWKSUHSHUIRUDWHGSXSVFHQWUDOL]HGDV SHUGHVLJQ
3LFNXSWKH´[´/LQHU+DQJHU3DFNHUZLWK5XQQLQJ7RRO$VVHPEO\WRWKH5LJ)ORRU0DNHXSWRWKH
OLQHUKDQJHU
7,+ZLWK´352'/LQHUURWDWHDVQHHGHGWRUHGXFHD[LDOIULFWLRQDQGUXQWR7'&LUFXODWHDVQHHGHGWKURXJK
WKHRSHQFLUFXODWLRQVXE
:LWKWKHOLQHURQERWWRPVHWWKHOLQHUWRSSDFNHUDVSHUHTXLSPHQWVSHFV
5HOHDVHUXQQLQJWRROVSHUIRUPaSVLOLQHUWRSWHVWWRFRQILUPSDFNHU OLQHUEDUULHULQWHJULW\
72+RQHOHYDWRUV/D\GRZQ352'/LQHU5XQQLQJ7RROV
5XQ´[´8SSHU&RPSOHWLRQZLWKVPDUWJDVOLIWPDQGUHOV6SDFHRXWSLFNXS ZLWKWKHDQQXODUFORVHGRQ
ODQGLQJVWULQJVSRWGLHVHOIUHH]HSURWHFW/DQGWXELQJKDQJHU SUHVVXUHXSWRVHWSDFNHU&RQILUPFRQQHFWLYLW\
WRVPDUW*/0V
,QVWDOO%39DQGSUHVVXUHWHVWKDQJHUVHDOVWRSVLFKDUWWHVW
1LSSOHGRZQ%23(
,QVWDOOWXELQJKHDGDGDSWHUDVVHPEO\DQGWUHH3UHVVXUHWHVWVDPHWRSVLFKDUWWHVW5HPRYH%39
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 13 of 23 Printed: 25-Aug-22
7HVWWXELQJDQGWXELQJFDVLQJDQQXOXVVHSDUDWHO\WRSVLPLQVFKDUWWHVWV
6KHDUFLUFXODWLRQYDOYHLQ*/0&LUFXODWHWXELQJWRGLHVHO IUHH]HSURWHFWDQQXOXV
6HW%39DQGVHFXUHZHOO5'02'R\RQ
32675,*±2SV
D 3UHVVXUHXSWRFRQYHUWIORWDWLRQEDUULHUGLVN XQORDGZHOO
'LVFXVVLRQRI0XGDQG&XWWLQJV'LVSRVDODQG$QQXODU'LVSRVDO
(Requirements of 20 AAC 25.005 (c)(14))
,QFLGHQWDOIOXLGVGHYHORSHGIURP&'GULOOLQJRSHUDWLRQVZL OOEHKDXOHGWRWKH$OSLQH*ULQG ,QMHFW
)DFLOLW\DQGLQMHFWHGLQWRWKHGHGLFDWHG&ODVVGLVSRVDOZHOO&'$RULIFRPSOHWHG&'$RQ&'
3DG
%HFDXVHRIWKH´,QWHUPHGLDWH/LQHU+DQJHUEORFNLQJWKH´6XUIDFH&DVLQJ6KRH&'LVQRWD
FDQGLGDWHIRUIXWXUHDQQXODUGLVSRVDO
$WWDFKPHQWV
Attachment 1 Cement Summary
Attachment 2 Drilling Hazards Summary
Attachment 3 Completion Schematic
Attachment 4 Directional Plan
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 14 of 23 Printed: 25-Aug-22
Dͬds
<KW ϮϲZ<ϱϰ͘ϱΖ ϯϬΗŽŶĚƵĐƚŽƌͲϭϱϬΖ ϵ͘ϱƉƉŐ
ϰϬϬΖD'͘>͘ϭϱ͘ϱΖ ϮϰΗ^hZ&,ŽůĞ Z/>W>ytD
Ϭ͘ϳϱͲϭ͘ϮϱΣ ϮϬΗϭϯϯη>ϴϬdͲZ &ŝŶĂůdƌŝƉKƵƚ
ͬϭϬϬĨƚ ϭϬ͘ϬƉƉŐ
ϭϬΣŝŶĐ ϭϯϬϴͬϭϯϬϰ ĂƐĞWĞƌŵ dKΛ^ƵƌĨĂĐĞ Z/>W>ytD
ϯϰϭ͘ϳΣĂnjŝ ϮϱϮϮͬϮϰϲϬ ͲϯϬ ϮϰϳϳͬϮϰϮϬ
ϯϯΣŝŶĐ ϮϵϭϬͬϮϳϵϳ ͲϮϬ ^
ϭ͘ϱͲϮΣ ϯϮϬϬͬϯϬϯϮ ͲϭϬ ϭϬ͘ϱͲϭϭ͘ϬƉƉŐ
ͬϭϬϬĨƚ ϰϱϬϴͬϯϴϲϲ <Ͳϯ ϭϳΗ>ŝŶĞƌϴϴ͘ϭη &tWtD
WϭϭϬ/,zϱϮϭ
ϭ͘ϳϱΣͬϭϬϬĨƚ ϱϬϯϳͬϰϬϴϱ dK>ΛϮϯϮϳD&ŝŶĂůdƌŝƉKƵƚ
dKΛϰϰϰϱͬϯϴϯϱ ϭϭ͘ϬƉƉŐ
ϳϴΣŝŶĐ ϱϳϰϵͬϰϮϲϲ ^Ƶď<ͲϮtĞƚ^^
ϯϰϭ͘ϳΣĂnjŝ ϲϰϬϬͬϰϯϵϴ
ϭϱͲϯͬϰΗdžϭϳͲϭͬϮΗ ƌŝůůŝŶŐ
ϳϴΣŝŶĐ /EdZDϮ,ŽůĞ ϭϭ͘ϬƉƉŐ
ϯϰϱ͘ϲΣĂnjŝ ϭϯͲϱͬϴΗĂƐŝŶŐ &tWtD
ϭΣͬϭϬϬĨƚ DWƉƉůŝĞĚ
ϭϭϰϰϴͬϱϰϭϵ ůďŝĂŶϵϳ ϭϭ͘ϬƉƉŐĞ
&ŝŶĂůdƌŝƉKƵƚ
dKΛϭϭϰϳϭͬϱϰϰϴ ϭϭ͘ϬƉƉŐ
ϭϮϲϴϬͬϱϲϵϴ ϯ
ϭϮͲϭͬϰΗdžϭϯͲϭͬϮΗ
/EdZDϯ,ŽůĞ ƌŝůůŝŶŐ
ϭϰϬϱϱͬϱϵϴϯ ůďŝĂŶϵϲ ϵϳͬϴΗ>ŝŶĞƌ ϭϭ͘ϬƉƉŐ
&tWtD
DWƉƉůŝĞĚ
dK>ΛϭϮϱϯϬ ϭϮ͘ϱƉƉŐĞ
ϭϲϭϯϲͬϲϰϭϰ ůďŝĂŶϵϱ &ŝŶĂůdƌŝƉKƵƚ
dKΛϭϳϯϰϲͬϲϲϲϱ ϭϭ͘ϱƉƉŐ
ϭϴϮϰϮͬϲϴϱϭ &^&tWtD
ϳϴΣŝŶĐ ϭϴϯϱϲͬϲϴϳϰ dŽƉ,ZϭϴϱϱϬͬϲϵϭϱ
ϯϰϱ͘ϲΣĂnjŝ ϴͲϭͬϮΗdžϭϬͲϭͬϰΗ
ϬΣͬϭϬϬĨƚ ϭϴϱϱϰͬϲϵϭϱ /EdZDϰ,ŽůĞ
hƉƉĞƌ<ĂůƵďŝŬ ϳϱͬϴΗ>ŝŶĞƌ
ϭϴϴϴϲͬϲϵϴϬ Ϯϵ͘ϳη>ͲϴϬ,zϱϮϯ ϭϭ͘ϱ
dK>ΛϭϴϰϬϬ E&
ϴϴΣŝŶĐ DWƉƉůŝĞĚ
ϯϮϱ͘ϲĂnjŝ dKΛϭϵϯϵϭͬϳϬϱϯ ϭϯ͘ϯͲϭϯ͘ϱƉƉŐĞ
Ϭ͘ϳϱΣͬϭϬϬĨƚ ϮϬϭϬϵͬϳϭϬϭ DdůĞŶŐƚŚ
ϴϵ͘ϲΣŝŶĐ <ƵƉĂƌƵŬϭ͕ϬϬϬΖD&ŝŶĂůdƌŝƉKƵƚ
ϭϯ͘ϬͲϭϯ͘ϮƉƉŐƐŐ
ϮϬϯϵϭͬϳϭϬϳ ϭϭ͘ϱƉƉŐK,
ϲͲϯͬϰΗWZK,ŽůĞ
ϰϭͬϮΗ>ŝŶĞƌ
ϭϮ͘ϲηWͲϭϭϬ,zϱϲϯ
ĂŬĞƌdK>ΛϮϬϮϰϭ &>KWZKtD
ϴϵ͘ϲΣŝŶĐ
ϯϮϱ͘ϲΣĂnjŝ ƌŝůůŝŶŐ
ϭϬ͘ϴƉƉŐ
&>KWZKtD
dƌŝƉtƚ͘ϭϬ͘ϴƉƉŐ
ϴϵ͘ϲΣŝŶĐ &>KWZKtD
ϯϮϱ͘ϲΣĂnjŝ ϯϯϲϲϯͬϳϭϵϲ ;WŽƌĞWƌĞƐƐĞƉͿ
ϬnjŝϯϲϬ
WůĂŶ
Ϭ/ŶĐϵϬ
Dͬds'ĞŽdŽƉƐ ĂƐŝŶŐͬĞŵĞŶƚ
,ŽůĞͬĂƐŝŶŐ^ŝnjĞ DƵĚ
&ƌĞƐŚǁĂƚĞƌďĂƐĞĚ
WŽůLJĞƌDƵĚ;&tWͿ
<ϭͲ>ŽǁĞƌ
<ĂůƵďŝŬ
ϭϳͲϭͬϮΗdžϮϬΗ
/EdZDϭ,ŽůĞ
ϲϮ͘ϴη>ͲϴϬ,zϱϲϯ
<ͲϮ;YĂŶŶŝŬͿ
ϴϴ͘Ϯη>ͲϴϬ/
,zϱϲϯ
/ŶŝƚŝĂů
ŝƐƉůĂĐĞŵĞŶƚ
ϭϬ͘ϬƉƉŐ
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 15 of 23 Printed: 25-Aug-22
$WWDFKPHQW±&HPHQW6XPPDU\
´6XUIDFH&DVLQJWR¶0'¶79'
&HPHQWIURP¶WR
0'¶ZLWKSSJ&ODVV*WDLODQGIURP
WRVXUIDFHZLWK
SSJ'HHS&5(7(OHDG$VVXPHH[FHVVDQQXODUYROXPHLQ3H UPDIURVWH[FHVVEHORZ
WKH3HUPDIURVWDQGQRH[FHVVZLWKLQWKH´FRQGXFWRU
/HDG6OXUU\IURP¶0'WR6XUIDFHZLWKSSJ'HHS&5(7(
&RQGXFWRU ¶±¶;IWIW;H[FHVV IW
3HUPDIURVWWR&RQGXFWRU ¶±¶;IWIW;H[FHVV IW
7RSRI7DLOWR3HUPDIURVW ¶±¶;IWIW;H[FHVV IW
7RWDO9ROXPH IW !V[RISSJ'HHS&5(7(#IWVN
7DLO6OXUU\IURP¶0'WR¶0'ZLWKSSJ&ODVV*DGGLWLYHV
6KRHWR7RSRI7DLO ¶±;IWIW;H[FHVV IW
6KRH-RLQWV ¶;IWIW;H[FHVV IW
7RWDO9ROXPH IW !V[RISSJ&ODVV*DGGLWLYHV#IWVN
´,QWHUPHGLDWH/LQHUWR¶0'¶79'
&HPHQWIURP¶WR¶0'¶ZLWKSSJ&ODVV*WDLODQGIURP¶WR¶79'!
¶0'DERYHWKHWRSRIWKH.4DQQLNUHVHUYRLUZLWKSSJ([WHQGHG&ODVV*OHDGDVVXPLQJ
H[FHVVDQQXODUYROXPH
/HDG6OXUU\IURP0'WR¶0'ZLWKSSJ([WHQGHG&ODVV*DGGLWLYHV
7RSRI7DLOWR¶79'$ERYH
.4DQQLN7RSDW¶0'¶±¶;IWIW;H[FHVV IW
7RWDO9ROXPH IW !V[RISSJ([WHQGHG&ODVV*DGGLWLYHV#IWVN
7DLO6OXUU\IURP¶0'WR¶0'ZLWKSSJ&ODVV*DGGLWLYHV
6KRHWR7RSRI7DLO ¶±¶;IWIW;H[FHVV IW
6KRH-RLQWV¶;IWIW;H[FHVV IW
7RWDO9ROXPH IW !V[RISSJ&ODVV*DGGLWLYHV#IWVN
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 16 of 23 Printed: 25-Aug-22
´,QWHUPHGLDWH&DVLQJWR¶0'¶79'
&HPHQWIURP¶WR¶79'DERYHOLQHUVKRH ZLWKSSJ&ODVV*DVVXPLQJH[FHVV
DQQXODUYROXPH
&HPHQWIURP0'WR¶0'ZLWKSSJ&ODVV*DGGLWLYHV
6KRHWR7RSRI&HPHQW ¶±¶;IWIW;H[FHVV IW
6KRH-RLQW ¶;IWIW;H[FHVV IW
7RWDO9ROXPH IW !V[RISSJ&ODVV*DGGLWLYHV#IWVN
´,QWHUPHGLDWH/LQHUWR¶0'¶79'
&HPHQWIURP¶WR¶79'DERYHWKH.XSDUXN&ZLWKSSJ&ODVV*DVVXPLQJH[FHVV
DQQXODUYROXPH
&HPHQWIURP¶0'WR¶0'ZLWKSSJ&ODVV*DGGLWLYHV
6KRHWR7RSRI&HPHQW ¶±¶;IWIW;H[FHVV IW
6KRH-RLQW ¶;IWIW;H[FHVV IW
7RWDO9ROXPH IW !V[RISSJ&ODVV*DGGLWLYHV#IWVN
´,QWHUPHGLDWH/LQHUWR¶0'¶79'
*Due to high angle and short open hole section the required 250’ TVD TOC is above our liner hanger
and in the shoe of the 9 7/8” casing. This is a high risk as our liner hanger is set against the plugs. If
the plugs don’t bump we have to wait on cement.
Intrm 4 is a drilling liner. A cement Intrm 3 shoe and Intrm 4 packer test provide isolation of the
formation.
&23UHTXHVWWRXVHWKH¶0'ࡱRSHQKROHYROXPH
&HPHQWIURP¶0'WR¶0'ZLWKSSJ&ODVV*DGGLWLYHV
6KRHWR7RSRI&HPHQW ¶±¶;IWIW;H[FHVV IW
6KRH-RLQW¶;IWIW;H[FHVV IW
7RWDO9ROXPH IW !V[RISSJ&ODVV*DGGLWLYHV#IWVN
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 17 of 23 Printed: 25-Aug-22
$WWDFKPHQW±'ULOOLQJ+D]DUGV6XPPDU\
7REHSRVWHGLQ5LJ)ORRU'RJKRXVH3ULRUWR6SXG
+ROH´&DVLQJ,QWHUYDO
(YHQW5LVN/HYHO0LWLJDWLRQ6WUDWHJ\
&RQGXFWRU%URDFK/RZ0RQLWRUFHOODUFRQWLQXRXVO\GXULQJLQWHUYDO
:HOO&ROOLVLRQ +LJK
&ORVHO\PRQLWRUWUDYHOLQJF\OLQGHUXSGDWHDV
QHHGHG8WLOL]HJ\URHTXLSPHQWDVQHHGHGWRYHULI\
ZHOOERUHORFDWLRQ&ORVHO\IROORZ&3$,$QWL
&ROOLVLRQSROLFLHV6KXWLQRIIVHWZHOOVDVUHTXLUHG
5LJXSGLYHUWHUIRUFROOLVLRQULVNPLWLJDWLRQ
*DV+\GUDWHV /RZ
'LYHUWHUGULOOVDQGLIREVHUYHG±FRQWUROGULOOUHGXFH
SXPSUDWHVDQGFLUFXODWLQJWLPHUHGXFHPXG
WHPSHUDWXUHV6KDOORZKD]DUGVWXG\QRWHGPLQLPDO
ULVNRQ&'SDG
$EQRUPDO3UHVVXUHLQ
6XUIDFH)RUPDWLRQV/RZ'LYHUWHUGULOOVLQFUHDVHGPXGZHLJKW6KDOORZ
KD]DUGVWXG\QRWHGPLQLPDOULVNRQ&'SDG
$EQRUPDO3UHVVXUHLQ&
&'$QQXODU,QMHFWLRQ/RZ
7RSVHW&IRUPDWLRQ1RDQQXODULQMHFWLRQ
SHUIRUPHGRQSDGVLQFHQRUDEQRUPDO
SUHVVXUHHQFRXQWHUHGLQ&RQ&'
&OD\%DOOLQJ +LJK
0DLQWDLQSODQQHGPXGSDUDPHWHUVDQGIORZUDWHV
8VHSURDFWLYHDQWLEDOOLQJVZHHSVDQGPXG
SURGXFWDGGLWLRQV
/RVW&LUFXODWLRQ /RZ
5HGXFHSXPSUDWHVPXGUKHRORJ\DGGORVW
FLUFXODWLRQPDWHULDO FRQWUROSLSHUXQQLQJVSHHGV
´[´+ROH´/LQHU,QWHUYDO
(YHQW5LVN/HYHO0LWLJDWLRQ6WUDWHJ\
/RVW&LUFXODWLRQ 0HGLXP
5HGXFHSXPSUDWHVUHGXFHWULSVSHHGVPRQLWRU
UHDOWLPH(&'VDGMXVWPXGUKHRORJ\DQGDGGORVW
FLUFXODWLRQPDWHULDODVQHHGHG
$EQRUPDO3UHVVXUHLQ
4DQQLN+LJK
(PSOR\4DQQLN3UHVVXUH0DQDJHPHQW3ODQ
3HUIRUPZHOOFRQWUROGULOOVIORZFKHFNDVQHHGHG
03'ILQJHUSULQWLISRVVLEOHLQFUHDVHPXGZHLJKW
$EQRUPDO3UHVVXUHLQ
2YHUEXUGHQ)RUPDWLRQV/RZ3HUIRUPZHOOFRQWUROGULOOVFKHFNIRUIORZGXULQJ
FRQQHFWLRQVDQGLQFUHDVHPXGZHLJKWDVQHHGHG
+ROH&OHDQLQJ /RZ
0RQLWRU(&'DQGWRUTXHGUDJWUHQGVFRQWUROGULOO
DQGXVHEHVWKROHFOHDQLQJSUDFWLFHVDQG
EDFNUHDPWRFOHDQKROHSULRUWROLQHUUXQ
6ZDEELQJRQ7ULSV 0HGLXP
5HGXFHWULSVSHHGVFRQGLWLRQPXGSURSHUWLHV
PRQLWRUKROHILOOSXPSRXWRIKROHPRQLWRUUHDOWLPH
(&'VDQGXVH03'LISRVVLEOH
'LIIHUHQWLDO6WLFNLQJ 0HGLXP
0RQLWRUIRUVHHSDJHORVVHVPRQLWRUVWDWLF7 '
IRUFHVUXQ/&0DVQHHGHGDQGHPSOR\SURSHU
FHQWUDOL]DWLRQWRSURYLGHVHPLIOXVKOLQHUVWDQGRII
4DQQLN&HPHQW,VRODWLRQ0HGLXP
&HQWUDOL]HIRU!6WDQG2IIXVH/HDG7DLO
VOXUU\GHVLJQWRUHGXFH(&'VFUHDWHPXGVSDFHU
VOXUU\WUDLQWRDOORZHIIHFWLYHGLVSODFHPHQWDQGEH
SUHSDUHGIRUOLQHUWRSVTXHH]HFRQWLQJHQF\
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 18 of 23 Printed: 25-Aug-22
´[´+ROH´/LQHU,QWHUYDO
(YHQW5LVN/HYHO0LWLJDWLRQ6WUDWHJ\
+ROH&OHDQLQJ /RZ
0RQLWRU(&'DQGWRUTXHGUDJWUHQGVFRQWUROGULOO
XVHEHVWKROHFOHDQLQJSUDFWLFHVDQGEDFNUHDPWR
FOHDQKROHSULRUWROLQHUUXQ
%+$)DLOXUH 0HGLXP3URDFWLYHO\SODQ%+$WULSWRDOORZIRUWRROZHDU
HYDOXDWLRQDQGPRQLWRUVKRFNDQGYLEUDWLRQ
/RVW&LUFXODWLRQ 0HGLXP
5HGXFHSXPSUDWHVUHGXFHWULSVSHHGVUHDOWLPH
(&'PRQLWRULQJPXGUKHRORJ\DGGORVWFLUFXODWLRQ
PDWHULDODVQHHGHG
&DVLQJ:HDU 0HGLXP0RGHOSUHYLRXVOLQHUFDVLQJZHDUKDYH15'33V
DYDLODEOH XVH&3$,FDVLQJZHDUEHVWSUDFWLFHV
6WXFN3LSH 0HGLXP
8VHJRRGGULOOLQJSUDFWLFHVPRQLWRU7 'WUHQGV
UXQ%+$GLVFRQQHFWVXELIQHFHVVDU\KDYHILVKLQJ
NLWSUHLGHQWLILHG
'LIIHUHQWLDO6WLFNLQJ 0HGLXP
0RQLWRUIRUVHHSDJHORVVHVUXQ/&0DVQHHGHG
PRQLWRUVWDWLF7 'IRUFHVFHQWUDOL]HOLQHUDV
QHHGHGWRSUHYHQWGLIIHUHQWLDOVWLFNLQJ
)ORDWHG/LQHU5XQ +LJK
(PSOR\&'DQG&'/HVVRQV/HDUQHG
LPSOHPHQWIORWDWLRQVSHFLILFZHOOFRQWUROGULOOV XVH
IORDWHGOLQHUGHFLVLRQWUHHIRULVVXHVHQFRXQWHUHG
´[´+ROH´/LQHU,QWHUYDO
(YHQW5LVN/HYHO0LWLJDWLRQ6WUDWHJ\
+ROH&OHDQLQJ /RZ
0RQLWRU(&'DQGWRUTXHGUDJWUHQGVFRQWUROGULOO
XVHEHVWKROHFOHDQLQJSUDFWLFHVDQGEDFNUHDPWR
FOHDQKROHSULRUWROLQHUUXQ
%+$)DLOXUH 0HGLXP3URDFWLYHO\SODQ%+$WULSWRDOORZIRUWRROZHDU
HYDOXDWLRQDQGPRQLWRUVKRFNDQGYLEUDWLRQ
/RVW&LUFXODWLRQ 0HGLXP
5HGXFHSXPSUDWHVUHGXFHWULSVSHHGVUHDOWLPH
(&'PRQLWRULQJPXGUKHRORJ\DGGORVWFLUFXODWLRQ
PDWHULDODVQHHGHG
&DVLQJ:HDU 0HGLXP0RGHOSUHYLRXVOLQHUFDVLQJZHDUKDYH15'33V
DYDLODEOH XVH&3$,FDVLQJZHDUEHVWSUDFWLFHV
6WXFN3LSH 0HGLXP
8VHJRRGGULOOLQJSUDFWLFHVPRQLWRU7 'WUHQGV
UXQ%+$GLVFRQQHFWVXELIQHFHVVDU\KDYHILVKLQJ
NLWSUHLGHQWLILHG
'LIIHUHQWLDO6WLFNLQJ 0HGLXP
0RQLWRUIRUVHHSDJHORVVHVUXQ/&0DVQHHGHG
PRQLWRUVWDWLF7 'IRUFHVFHQWUDOL]HOLQHUDV
QHHGHGWRSUHYHQWGLIIHUHQWLDOVWLFNLQJ
)ORDWHG/LQHU5XQ +LJK
(PSOR\&'DQG&'/HVVRQV/HDUQHG
LPSOHPHQWIORWDWLRQVSHFLILFZHOOFRQWUROGULOOV XVH
IORDWHGOLQHUGHFLVLRQWUHHIRULVVXHVHQFRXQWHUHG
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 19 of 23 Printed: 25-Aug-22
´[´+ROH´/LQHU,QWHUYDO
(YHQW5LVN/HYHO0LWLJDWLRQ6WUDWHJ\
:HOOERUH,QVWDELOLW\ +LJK
,VRODWHGLQVWDEOHVKDOHVZLWKGHGLFDWHGKROH
VHFWLRQHPSOR\&'DQG&'LQVWDELOLW\
PLWLJDWLRQVXQGHUUHDPHUSURSHU(0:WRSUHYHQW
VKHDUIDLOXUH03' LQKLELWHGIOXLGPRQLWRUUHDO
WLPHGULOOLQJGDWD8VH&3$,/RZHU6KDOHLQVWDELOLW\
PLWLJDWLRQGULOOLQJEHVWSUDFWLFHV
/RVW&LUFXODWLRQ +LJK
5HGXFHSXPSUDWHVUHGXFHWULSVSHHGVUHDOWLPH
(&'PRQLWRULQJPXGUKHRORJ\DGGORVWFLUFXODWLRQ
PDWHULDODVQHHGHG8VH03'WRUHGXFH(&'V
$EQRUPDO5HVHUYRLU
3UHVVXUH+LJK
:HOOFRQWUROGULOOVIORZFKHFNGXULQJFRQQHFWLRQV
XVH03'WRILQJHUSULQWSURYLGHG\QDPLF
RYHUEDODQFHLQFUHDVHPXGZHLJKWDVQHHGHGWR
PDLQWDLQRYHUEDODQFHGXULQJWULSSLQJDFWLYLWLHV
/DQGLQJLQ7KLQ.XSDUXN&+LJK
8VH&'DQG&'GDWDWRUHGXFHGHSWK
XQFHUWDLQW\8VH8OWUD'HHS$]LPXWKDO5HVLVWLYLW\
WRLGHQWLI\.XSDUXN&DQGDVVLVWZLWKDGMXVWLQJ
ODQGLQJ
6ZDEELQJRQ7ULSV 0HGLXP
5HGXFHWULSVSHHGVFRQGLWLRQPXGSURSHUWLHV
SURSHUKROHILOOLQJSXPSRXWRIKROHUHDOWLPH(&'
PRQLWRULQJ XVH03'LISRVVLEOH
&HPHQWDURXQGOLQHU
KDQJHUIURP¶79'
UHJXDOWLRQ
+LJK
'XHWRKLJKDQJOHDQGVKRUWRSHQKROHVHFWLRQWKH
UHTXLUHG¶79'72&LVDERYHRXUOLQHUKDQJHU
DQGLQWKHVKRHRIWKH´FDVLQJ7KLVLVDKLJK
ULVNDVRXUOLQHUKDQJHULVVHWDJDLQVWWKHSOXJV,I
WKHSOXJVGRQ¶WEXPSZHKDYHWRZDLWRQFHPHQW
5HGXFHFHPHQWFROXPQWR¶0'RURIWKH
RSHQKROHYROXPH
%DULWH6DJ +LJK
8VHXOWUDILQHEDULWHWRUHGXFHVDJULVN(PSOR\
EDULWHVDJPLWLJDWLRQEHVWSUDFWLFHV
´+ROH´3UH3HUIRUDWHG/LQHU,QWHUYDO
(YHQW5LVN/HYHO0LWLJDWLRQ6WUDWHJ\
/RVW&LUFXODWLRQ 0HGLXP
5HGXFHSXPSUDWHVUHGXFHWULSVSHHGVUHDOWLPH
(&'PRQLWRULQJPXGUKHRORJ\DGGORVWFLUFXODWLRQ
PDWHULDODVQHHGHG8VH03'WRUHGXFH(&'V
$EQRUPDO5HVHUYRLU
3UHVVXUH+LJK
:HOOFRQWUROGULOOVIORZFKHFNGXULQJFRQQHFWLRQV
XVH03'WRILQJHUSULQWSURYLGHG\QDPLF
RYHUEDODQFHLQFUHDVHPXGZHLJKWDVQHHGHGWR
PDLQWDLQRYHUEDODQFHGXULQJWULSSLQJDFWLYLWLHV
6WD\LQJLQ.XSDUXN&+LJK
8VHJHRVWHHULQJEHVWSUDFWLFHVIURPRIIVHW1DQXT
.XSDUXN&XVH'HHS5HDGLQJ$]LPXWKDO
5HVLVWLYLW\WRROWRDVVLVWZLWKUHVHUYRLU
LQWHUSUHWDWLRQDQGFUHDWHGHFLVLRQWUHHUHVSRQGLQJ
WRIRUUHVHUYRLUH[FXUVLRQV
:HOOERUH,QVWDELOLW\+LJK
(PSOR\&'DQG&'LQVWDELOLW\
PLWLJDWLRQVXQGHUUHDPHUSURSHU(0:WRSUHYHQW
VKHDUIDLOXUH03' LQKLELWHGIOXLGPRQLWRUUHDO
WLPHGULOOLQJGDWD8VH&3$,/RZHU6KDOHLQVWDELOLW\
PLWLJDWLRQGULOOLQJEHVWSUDFWLFHV
%DULWH6DJ+LJK8VHZHLJKWHGNLOOZHLJKWEULQHIRUWULSSLQJ
RSHUDWLRQV
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 20 of 23 Printed: 25-Aug-22
6ZDEELQJRQ7ULSV 0HGLXP
5HGXFHWULSVSHHGVXVHZHLJKWHGNLOOZHLJKWEULQH
WRUHGXFHVZDESUHVVXUHPRQLWRUWULSWDQNV XVH
03'LISRVVLEOH
:HOO3UR[LPLW\5LVNV
&'ZLOOEHWKHVHYHQW\VHYHQWKWKZHOOGULOOHGRQWKHSDG'LUHFWLRQDOGULOOLQJFROOLVLRQDYRLGDQFH
LQIRUPDWLRQDVUHTXLUHGE\$&&ELVSURYLGHGLQWKH IROORZLQJDWWDFKPHQWV
'ULOOLQJ$UHD5LVNV
4DQQLN .XSDUXN&5HVHUYRLU3UHVVXUH2IIVHWLQMHFWLRQKDVWKHSRWHQWLDOWRLQFUHDVHWKHUHVHUYRLU
SUHVVXUH+HLJKWHQHGDZDUHQHVVDQGJRRGZHOOFRQWUROSUDFWLFHVZLOOEHXVHGWRSUHYHQWDZHOOFRQWURO
VFHQDULR,IDZHOOFRQWUROVFHQDULRLVHQFRXQWHUHGZHOOFRQWUROGULOOVZLOOEHXVHGWRUHGXFHVKXWLQWLPHV
DQGHQRXJKNLOOZHLJKWPDWHULDOZLOOEHRQORFDWLRQWRNLOOWKHZHOODVUHTXLUHG
:HDN2YHUEXUGHQ6DQG6WULQJHUV±&OHDQVDQGVWULQJHUVIURPVORSHGHSRVLWVZHUHLQWHUPLWWHQWO\
GHSRVLWHGRQWKHVORSHVKHOYHVRIWKH7RURNDQG$OELDQ7KHVHFOHDQVDQGVKDYHUHGXFHGIUDFWXUH
JUDGLHQWVUHODWLYHWRWKHVLOWVDQGFOD\VWKDWPDNHXSPRVWRIWKHRYHUEXUGHQ/&0PDWHULDOZLOOEH
DYDLODEOHWRPLWLJDWHORVVHVLQWKHLQWHUPHGLDWHVHFWLRQV
/RZHU6KDOH6WDELOLW\7KH+5=DQG.DOXELNLQWKH,QWHUPHGLDWHKROHVHFWLRQZLOOUHTXLUHKLJKHUPXG
ZHLJKWVWKDQKLVWRULFDOO\XVHGWRHQKDQFHZHOOERUHVWDELOLW\0DQDJHG3UHVVXUH'ULOOLQJZLOOEHXVHGLQ
FRQMXQFWLRQZLWKDVWULQJFDVLQJGHVLJQWRPLWLJDWH+5= .DOXELNVKDOHLQVWDELOLW\/&0PDWHULDODQG
ZHOOERUHVWUHQJWKHQLQJSLOOVDUHH[SHFWHGWREHHIIHFWLYHLQGHDOLQJZLWKORVWFLUFXODWLRQDVUHTXLUHGWR
PDLQWDLQVXIILFLHQWRYHUEDODQFHIRUZHOOERUHLQVWDELOLW\PLWLJD WLRQ
)RUDOOVHFWLRQVJRRGWULSSLQJSUDFWLFHVZLOOEHVWUHVVHGWRPLQLPL]HWKHSRWHQWLDORIWDNLQJVZDEEHGNLFNV
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'6DYHG$XJ CRU CD2-361 AOGCC APD Page 21 of 23 Printed: 25-Aug-22 $WWDFKPHQW±&RPSOHWLRQ6FKHPDWLF
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 22 of 23 Printed: 25-Aug-22
$WWDFKPHQW±3URSHUW\3ODW
6XSHUVHGHG
6)'
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG$XJ
CRU CD2-361 AOGCC APD
Page 23 of 23 Printed: 25-Aug-22
$WWDFKPHQW±'LUHFWLRQDO3ODQ&'
&'ZS
2EMHFWLYH3ODQQHGILQDOZHOOSDWKIRU)LRUG:HVW.XSDUXNSUHSURGXFHGLQMHFWRU&'
SURGXFHU6)'
&'ZS3ODQ6XPPDU\
'RJOHJ6HYHULW\
0HDVXUHG'HSWK
[
[
[
[
[
[
$]LPXWKIURP1RUWK>@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XV IWLQ@
&'3%
&'
&'
&'
&'
&'
&' ZS
7UXH9HUWLFDO'HSWK
9HUWLFDO6HFWLRQDW
[
[
[
[
[
[
&HQWUHWR&HQWUH6HSDUDWLRQ
0HDVXUHG'HSWK
(TXLYDOHQW0DJQHWLF'LVWDQFH
'',
6859(< 352*5$0
'DWH79DOLGDWHG<HV9HUVLRQ
'HSWK)URP 'HSWK 7R 6XUYH\3ODQ 7RRO
&'ZS&' *<'*&66
&'ZS&' 0:'2:6*
&'ZS&' 0:',)56$*06
&'ZS&' 0:'2:6*
&'ZS&' 0:',)56$*0
6
&'ZS&' 0:'2:6*
&'ZS&' 0:',)56$*0 6 &'ZS&' 0:'2:6*
&'ZS&' 0:',)56$*0 6 &'ZS&' 0:'2:6*
&'ZS&' 0:',)56$*06
*URXQG
&$6,1* '(7$,/6
79'0'1DPH
[
[
[
[
[
[
0DJ0RGHO 'DWH %**0 1RY
0DJQHWLF1RUWKLV(DVWRI7UXH1RUWK0DJQHWLF'HFOLQDWLR
0DJ'LS )LHOG6WUHQJWK Q7
6(&7,21 '(7$,/6
6HF 0' ,QF $]L 79' 16 (: 'OHJ 7)DFH 96HFW 7DUJHW $QQRWDWLRQ
6WDUW%XLOG
6WDUW%XLOG
6WDUW%XLOG
6WDUWKROGDW0'
6WDUW%XLOG
6WDUW%XLOG
6WDUW%XLOG
6WDUWKROGDW0'
6WDUW%XLOG
6WDUW%XLOG
6WDUW%XLOG
6WDUW%XLOG
6WDUW%XLOG
6WDUW'/67)2
6WDUWKROGDW0'
6WDUW'/67)2
&'7$& 6WDUW'/67)2
6WDUWKROGDW0'
6WDUW'/67)2
6WDUWKROGDW0'
&'7+ 6WDUWKROGDW0'
6WDUW'/67)2
6WDUWKROGDW0'
&'77 7'DW
)250$7,21723'(7$,/6
79'3DWK )RUPDWLRQ
%DVH)UR]HQ6DQG
%DVH3HUP
&
&
&
&
.
7RS4DQQLN.
%DVH4DQQLN.%DVH
7RS.:HW6DQG
%DVH.:HW6DQG
$OE
$OE
$OE
)&6
+5=,QVLWX
8SSHU.DOXELN
/RZHU.DOXELN.
.XS&
%\VLJQLQJWKLV,DFNQRZOHGJHWKDW,KDYHEHHQLQIRUPHGRIDOOULVNVFKHFNHGWKDWWKHGDWDLVFRUUHFWHQVXUHGLW
VFRPSOHWHQHVVDQGDOOVXUURXQGLQJZHOOVDUHDVVLJQHGWRWKHSURSHUSRVLWLRQDQG,DSSURYHWKHVF DQDQGFROOLVLRQDYRLGDQFHSODQDVVHWRXWLQWKHDXGLWSDFN,DSSURYHLWDVWKHEDVLLV
IRUWKHILQDOZHOOSODQDQGZHOOVLWHGUDZLQJV,DOVRDFNQRZOHGJHWKDWXQOHVVQRWLILHGRWKHUZLVHDOOWDUJHWVKDYHDIHHWODWHUDOWROHUDQFH
3UHSDUHGE\&KHFNHGE\$FFHSWHGE\$SSURYHGE\
3ODQ#XVIW'R\RQ
7UXH9HUWLFDO'HSWK 9HUWLFDO6HFWLRQDW[[[[[[&'ZS%DVH)UR]HQ6DQG%DVH3HUP&&&&.7RS4DQQLN.%DVH4DQQLN.%DVH7RS.:HW6DQG%DVH.:HW6DQG$OE$OE$OE)&6+5=,QVLWX8SSHU.DOXELN/RZHU.DOXELN..XS&&'ZS-XO\6HFWLRQ9LHZ
0500010000150002000025000South(-)/North(+)-25000 -20000 -15000 -10000 -5000 0 5000 10000West(-)/East(+)20 x 2417 x 17-1/2 - 2013-5/8 x 14-3/4 - 17-1/29 7/8 x 12-1/4 - 13-1/27-5/8 x 8-1/2 - 10-1/44 1/2 x 6-3/4CD2-361 wp19.3While drilling production section, stay within 100 feet laterally of plan, unless notified otherwise.9:33, July 15 20223ODQ9LHZ
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Chris Brillon
Wells Engineering Manager
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage, AK, 99510-0360
Re: Colville River Field, Alpine Oil Pool, CRU CD2-361
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 221-116
Surface Location: 2181’ FNL, 1770’ FEL, Sec. 2, T11N, R4E, Umiat
Bottomhole Location: 2112’ FNL, 28’ FEL, Sec. 8, T12N, R4E, Umiat
Dear Mr. Brillon:
Enclosed is the approved application for the permit to drill the above referenced well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Jeremy M. Price
Chair
DATED this ___ day of January, 2022.
Jeremy
Price
Digitally signed by
Jeremy Price
Date: 2022.01.20
17:47:39 -09'00'
D7\SHRI:RUN E3URSRVHG:HOO&ODVV ([SORUDWRU\*DV 6HUYLFH:$* 6HUYLFH'LVS F6SHFLI\LIZHOOLVSURSRVHGIRU
'ULOO /DWHUDO 6WUDWLJUDSKLF7HVW 'HYHORSPHQW2LO 6HUYLFH:LQM 6LQJOH=RQH &RDOEHG*DV *DV+\GUDWHV
5HGULOO 5HHQWU\ ([SORUDWRU\2LO 'HYHORSPHQW*DV 6HUYLFH6XSSO\ 0XOWLSOH=RQH *HRWKHUPDO 6KDOH*DV
2SHUDWRU1DPH %RQG %ODQNHW 6LQJOH:HOO :HOO1DPHDQG1XPEHU
%RQG1R
$GGUHVV 3URSRVHG'HSWK )LHOG3RROV
0' 79'
D/RFDWLRQRI:HOO*RYHUQPHQWDO6HFWLRQ 3URSHUW\'HVLJQDWLRQ
6XUIDFH
7RSRI3URGXFWLYH+RUL]RQ '15$SSURYDO1XPEHU $SSUR[LPDWH6SXG'DWH
7RWDO'HSWK$FUHVLQ3URSHUW\'LVWDQFHWR1HDUHVW3URSHUW\
WR$'/
E/RFDWLRQRI:HOO6WDWH%DVH3ODQH&RRUGLQDWHV1$' .%(OHYDWLRQDERYH06/IW 'LVWDQFHWR1HDUHVW:HOO2SHQ
6XUIDFH[\=RQH WR6DPH3RRO
WR7HPSWDWLRQ$
'HYLDWHGZHOOV .LFNRIIGHSWK IHHW 0D[LPXP3RWHQWLDO3UHVVXUHVLQSVLJVHH$$&
0D[LPXP+ROH$QJOH GHJUHHV 'RZQKROH 6XUIDFH
+ROH &DVLQJ :HLJKW *UDGH &RXSOLQJ /HQJWK 0' 79' 0' 79'
; :HOGHG
/ 716(5
3,& 716:
/,& 716:
/ 716: V[SSJ&ODVV*7DLO
/ 716: V[SSJ&ODVV*7DLO
/ 716:
35(6(17:(//&21',7,216800$5<7REHFRPSOHWHGIRU5HGULOODQG5H(QWU\2SHUDWLRQV
-XQNPHDVXUHG
79'
+\GUDXOLF)UDFWXUHSODQQHG" <HV 1R
$WWDFKPHQWV 3URSHUW\3ODW %236NHWFK 'ULOOLQJ3URJUDP 7LPHY'HSWK3ORW 6KDOORZ+D]DUG$QDO\VLV
'LYHUWHU6NHWFK 6HDEHG5HSRUW 'ULOOLQJ)OXLG3URJUDP $$&UHTXLUHPHQWV
&RQWDFW1DPH 0DWW:LHQV
&KULV%ULOORQ &RQWDFW(PDLO0DWW5:LHQV#&RQFR3KLOOLSVFRP
:HOOV(QJLQHHULQJ0DQDJHU &RQWDFW3KRQH
'DWH
3HUPLWWR'ULOO $3,1XPEHU 3HUPLW$SSURYDO
1XPEHU'DWH
&RQGLWLRQVRIDSSURYDO ,IER[LVFKHFNHGZHOOPD\QRWEHXVHGWRH[SORUHIRUWHVWRUSURGXFHFRDOEHGPHWKDQHJDVK\GUDWHVRUJDVFRQWDLQHGLQVKDOHV
6DPSOHVUHT
G<HV1R 0XGORJUHT
G<HV1R
+6PHDVXUHV<HV1R 'LUHFWLRQDOVY\UHT
G<HV1R
6SDFLQJH[FHSWLRQUHT
G<HV1R ,QFOLQDWLRQRQO\VY\UHT
G<HV1R
3RVWLQLWLDOLQMHFWLRQ0,7UHT
G<HV1R
$33529('%<
$SSURYHGE\ &200,66,21(5 7+(&200,66,21 'DWH
&RPP &RPP 6U3HW(QJ 6U3HW*HR 6U5HV(QJ
&58&'
&ROYLOOH5LYHU)LHOG
$OSLQH2LO3RRO
&HPHQW4XDQWLW\FIRUVDFNV
&RPPLVVLRQ8VH2QO\
6HHFRYHUOHWWHUIRURWKHU
UHTXLUHPHQWV
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
3(50,772'5,//
$$&
V[SSJ([WHQGHG&ODVV*
/HDGV[SSJ&ODVV*7DLO
)1/
)(/6HF715(80
)1/
)(/6HF715(80
/216
32%R[$QFKRUDJH$.
&RQRFR3KLOOLSV
)1/
)(/6HF715(80 $'/$'/$'/$$
$'/$'/$'/$'/
$'/
&DVLQJ3URJUDP 7RS6HWWLQJ'HSWK%RWWRP6SHFLILFDWLRQV
&HPHQW9ROXPH 0'6L]H
3OXJVPHDVXUHG
LQFOXGLQJVWDJHGDWD
\GV6OXUU\
V[SSJ'HHS&5(7(/HDG
V[SSJ&ODVV*7DLO
&RQGXFWRU6WUXFWXUDO
/HQJWK&DVLQJ
$XWKRUL]HG7LWOH
$XWKRUL]HG6LJQDWXUH
3URGXFWLRQ
/LQHU
,QWHUPHGLDWH
$XWKRUL]HG1DPH
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEH
GHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
6XUIDFH
3HUIRUDWLRQ'HSWK79'IW
*/%)(OHYDWLRQDERYH06/IW
3HUIRUDWLRQ'HSWK0'IW
V[SSJ&ODVV*7DLO
8QFHPHQWHG/LQHU%HQHDWK3DFNHU
(IIHFW'HSWK0'IW (IIHFW'HSWK79'IW
6WUDWLJUDSKLF7HVW
1R 0XGORJUHT
G<HV1R
1R 'LUHFWLRQDOVY\UHT
G<HV1R
6HDEHG5HSRUW'ULOOLQJ)OXLG3URJUDP $$&UHTXLUHPHQWV
%236NHWFK'ULOOLQJ3URJUDP 7LPHY'HSWK3ORW 6KDOORZ+D]DUG$QDO\VLV
6LQJOH:HOO
*DV+\GUDWHV
1R ,QFOLQDWLRQRQO\VY\UHT
G<HV1R
([SORUDWRU\2LO 'HYHORSPHQW*DV 6HUYLFH6XSSO\0XOWLSOH=RQH *HRWKHUPDO
1R
1R
)RUP5HYLVHG7KLVSHUPLWLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDOSHU$$&J
By Samantha Carlisle at 12:06 pm, Dec 29, 2021
'LJLWDOO\VLJQHGE\&KULV%ULOORQ
'1& 8628 :HOOV(QJLQHHULQJ2 &RQRFR3KLOOLSV$ODVND&1 &KULV%ULOORQ
( FKULVOEULOORQ#FRQRFRSKLOOLSVFRP
5HDVRQ,DPDSSURYLQJWKLVGRFXPHQW
/RFDWLRQ$QFKRUDJH$ODVND
'DWH
)R[LW3')(GLWRU9HUVLRQ
&KULV%ULOORQ
X
may require a cement quality log specified by AOGCC
BOP test pressure to 4000 psig
Annular preventer pressure to 2500 psig
A variance to 20 AAC 25.035(c)(1)(B) is granted. Doyon 26 may use
the 16" diameter diverter line based on meeting all the requirements in OTH-17-048(attached)
BOP testing frequency is two weeks. A variance for an event based BOP test frequency is approved as attached in Conditions of Approval.(20 AAC 25.035(h)
LOT/FIT results transmitted to AOGCC as soon as available. Indications of improper cementing may require a cement quality log. (20 AAC 25.030(d)(5))
Results of cement job and interpretation submitted to AOGCC as soon as available. A sonic log may be used per conditions of approval attached, however any indications of improper cementing
DSR-1/3/22VTL 01/20/22
X
X
X
221-116
X
X
X
SFD 12/30/2021
50-103-20836-00-00
X
dts 1/20/2022 JLC 1/20/2022
1/20/2022
Jeremy Price Digitally signed by Jeremy Price
Date: 2022.01.20 17:48:03 -09'00'
CRU CD2-361 (PTD 221-116)
Conditions of Approval:
Approval is granted to run the LWD-Sonic on upcoming well CRU CD2-361 with the following provisions:
1. CPAI will provide a written log evaluation/interpretation to the AOGCC along with the log as
soon as they become available. The evaluation is to include/highlight the intervals of competent
cement (and lengths) that CPAI is using to meet the objective requirements for annular
isolation, reservoir isolation, or confining zone isolation etc. Providing the log without an
evaluation/interpretation is not acceptable.
2. LWD sonic logs must show free pipe and Top of Cement, just as the e-line log does. CPAI must
start the log at a depth to ensure the free pipe above the TOC is captured as well as the TOC.
Starting the log below the actual TOC based on calculations predicting a different TOC will not
be acceptable.
3. CPAI will provide a cement job summary report and evaluation along with the cement log and
evaluation to the AOGCC when they become available
4. CPAI will provide the results of the FIT when available.
5. Depending on the cement job results indicated by the cement job report, the logs and the FIT,
remedial measures or additional logging may be required.
CONDITIONS OF APPROVAL
BOP Testing Frequency – Approval of Event Based Frequency
CRU CD2-361
PTD 221-116
CPAI has requested a variance to the 14-day BOPE testing frequency while drilling the Intermediate 2
and Intermediate 3 sections of the CD2-361 well. The best maintenance of hole conditions while drilling,
tripping and floated liner operations will occur when BOPE testing occurs while the tools are out of hole.
This will not coincide with the required 14-day BOPE test interval (20 AAC 25.035(e)(10)(A)). Without the
requested variance, extension requests by CPAI to the 14-day BOPE test interval while drilling the
Intermediate 2 and Intermediate 3 sections would occur to avoid BOPE testing that could contribute to
hole instability, difficult drilling operations and a potential well control event. While drilling the
Intermediate 2 and the Intermediate 3 sections, this modification to the BOPE test frequency is equally
effective to the 14 day BOPE test frequency.
A variance is granted to the two week BOP test frequency requirement while drilling the Intermediate 2
and Intermediate 3 sections. (20 AAC 25.035(h)). This variance is allowed under the following conditions:
1. BOPE testing to occur when the tools are out of the hole
2. A BOPE test must be conducted immediately prior to drilling the Intermediate 2 and
the Intermediate 3 sections.
3. Daily drilling status updates to the AOGCC are required while drilling the Intermediate
2 and Intermediate 3 sections.
BOPE tests shall occur at intervals not exceeding 14 days between tests when drilling sections other than
the Intermediate 2 and Intermediate 3 sections.
January 13, 2022
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
Re: CD2-361 (PTD 221-116) Event Based BOP Testing Interval
To: Victoria Loepp
On the recently submitted drilling permit application for the subject well, event-based
BOP testing was requested in steps 39 and 52 of the Proposed Drilling Program within
the permit package. This request applied to the Intermediate 2 and Intermediate 3
sections of the well.
ConocoPhillips Alaska provides the following information to support event-based BOP
testing on the BOP equipment in the Intermediate 2 and Intermediate 3 sections of the
CD2-361 well:
1. The section has no over pressure or hydrocarbon zones, proved in well CD2-162
and the recently drilled CD2-310 well.
2. The section was originally drilled as a single interval in CD2-310 and was
completed in two sections after two attempts failed on the single section
planned.
3. Experience from CD2-310 shows that both Intermediate 2 and Intermediate 3
sections require managed pressure drilling, backreaming and floated liners for
successful completion.
Attached is the breakdown of BOP tests completed on CD2-310 in 2021. The event-
based testing variance allowed three intervals(highlighted) of 22, 28 and 31 days
respectively that were critical to the completion of the well to that point. By testing prior
to these events and drilling/tripping and completing the interval without a time
constraint, focus was held on hole conditions and best maintenance of them.
Swab/surge issues on the formation stability were minimized by eliminating hang-off in
casing for testing.
Please call me at 263-4749 if you need further information to support the permit
request.
G. S. Hobbs
Regulatory Engineer
Wells
P.O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-263-4749
Sincerely,
G. S. Hobbs
Regulatory Engineer
Attachments:
CD2-310 BOP Test Intervals
CD2-310 BOP Test Intervals
&RQRFR3KLOOLSV$ODVND,QF
3RVW2IILFH%R[
$QFKRUDJH$ODVND
7HOHSKRQH
'HFHPEHU
$ODVND2LODQG*DV&RQVHUYDWLRQ&RPPLVVLRQ
:HVWWK$YHQXH6XLWH
$QFKRUDJH$ODVND
5H $SSOLFDWLRQIRU3HUPLWWR'ULOO&58&'
'HDU6LURU0DGDP
&RQRFR3KLOOLSV$ODVND,QFKHUHE\DSSOLHVIRUD3HUPLWWR'ULOODQRQVKRUHSURGXFHUZHOOIURPWKH&'GULOOLQJSDG7KHLQWHQGHGVSXGGDWH
IRUWKLVZHOOLV)HEUXDU\XVLQJ'R\RQ5LJWRGULOOWKHZHOO
&'LVSODQQHGWREHDODWHUDO.XSDUXN&SURGXFHU7KH´6XUIDFHVHFWLRQZLOO7'DERYHWKH&VDQGDQGWKHQ´FDVLQJZLOOEHVHW
DQGFHPHQWHGWRVXUIDFH7KHLQWHUPHGLDWHKROHZLOOEHGULOOHGLQIRXUVHFWLRQVWRPLWLJDWHLVVXHVZLWKGULOOLQJWKHH[WHQGHGRYHUEXUGHQ
VHFWLRQ
7KH´[´,QWHUPHGLDWHVHFWLRQZLOOEHGULOOHGWR¶0'DQGODQGHGDWDQLQFOLQDWLRQRI$´OLQHUZLOOEHVHWDQG
FHPHQWHGIURP7'WRVHFXUHWKHVKRHLVRODWHWKH4DQQLNUHVHUYRLU7KH´[´,QWHUPHGLDWHVHFWLRQZLOOEHGULOOHGDW
LQFOLQDWLRQWKURXJKWKH$OELDQDQGVHWDW¶0'7KH´FDVLQJZLOOEHVHWDQGFHPHQWHGWR¶79'DERYHWKHVKRH7KH
´[´,QWHUPHGLDWHVHFWLRQZLOOEHGULOOHGDWLQFOLQDWLRQWR¶79'LQWRWKH+5=0DQDJHG3UHVVXUH'ULOOLQJWHFKQRORJ\ZLOO
EHXWLOL]HGWRPLWLJDWHZHOOERUHLQVWDELOLW\DQGORVWFLUFXODWLRQDFURVVWKLVLQWHUYDO$´OLQHUZLOOEHVHWDQGFHPHQWHGWR¶79'DERYH
WKHVKRH
7KHò´[ó´GULOOHGWKURXJKWKH+5=DQG.DOXELNDQGZLOOODQGZLWKLQWKH.XSDUXN&WDUJHWUHVHUYRLU$´OLQHUZLOOEHVHWDQG
FHPHQWHGWR¶0'DERYHWKHWRS.XSDUXN&0DQDJHG3UHVVXUH'ULOOLQJWHFKQRORJ\ZLOOEHXWLOL]HGWRPLWLJDWHZHOOERUHLQVWDELOLW\DQG
ORVWFLUFXODWLRQDFURVVWKLVLQWHUYDO
7KH´3URGXFWLRQVHFWLRQZLOOEHJHRVWHHUHGZLWKLQWKH.XSDUXN&WDUJHWUHVHUYRLUZLWK7'SRWHQWLDOO\EHLQJDGMXVWHGDVSHUUHVHUYRLU
H[WHQWDQGTXDOLW\7KHZHOOZLOOEHFRPSOHWHGDVDSURGXFHU$´SUHSHUIRUDWHGOLQHUZLOOEHVHWDQGWKHZHOOZLOOEHFRPSOHWHGZLWKD
WDSHUHG´[´WXELQJXSSHUFRPSOHWLRQVWULQJ
,WLVUHTXHVWHGWKDWDGLYHUWRUZDLYHU$$&KEHJUDQWHGDV&'LVEHLQJGULOOHGIURPDQH[LVWLQJGULOOVLWHZLWKHLJKWZHOOV
ZLWKLQ¶UDGXLVZLWKQRJDVVKRZV
3OHDVHILQGDWWDFKHGWKHLQIRUPDWLRQUHTXLUHGE\$&&DDQGFIRU\RXUUHYLHZ3HUWLQHQWLQIRUPDWLRQDWWDFKHGWRWKLV
DSSOLFDWLRQLQFOXGHVWKHIROORZLQJ
)RUP$33/,&$7,21)253HUPLWWR'ULOOSHU$&&D
$SURSRVHGGULOOLQJSURJUDP
$SURSRVHGFRPSOHWLRQGLDJUDP
$GULOOLQJIOXLGVSURJUDPVXPPDU\
3UHVVXUHLQIRUPDWLRQDVUHTXLUHGE\$&&G
'LUHFWLRQDOGULOOLQJFROOLVLRQDYRLGDQFHLQIRUPDWLRQDVUHTXLUHGE\$&&E
,QIRUPDWLRQSHUWLQHQWWRWKHDSSOLFDWLRQWKDWLVSUHVHQWO\RQILOHDWWKH$2*&&
'LDJUDPVRIWKH%23HTXLSPHQWGLYHUWHUHTXLSPHQWDQGFKRNHPDQLIROGOD\RXWDVUHTXLUHGE\$&&D
DQGE
$GHVFULSWLRQRIWKHGULOOLQJIOXLGVKDQGOLQJV\VWHP
'LDJUDPRIULVHUVHWXS
,I\RXKDYHDQ\TXHVWLRQVRUUHTXLUHIXUWKHULQIRUPDWLRQSOHDVHFRQWDFW0DWW:LHQVDW
0DWW5:LHQV#&RQRFR3KLOOLSVFRPRU&KULV%ULOORQDW
6LQFHUHO\ FF
&':HOO)LOH-HQQD7D\ORU $72
'DYLG/HH$72
&KULV%ULOORQ $72
0DWW:LHQV /D\OD8QJHU $72
6HQLRU'ULOOLQJ(QJLQHHU *UHJ+REEV $72
$QG\0DFN.XXNSLN&RUS
'LJLWDOO\VLJQHGE\0DWW:LHQV
'1&1 0DWW:LHQV( PDWWUZLHQV#FRSFRP& 86
5HDVRQ,DPWKHDXWKRURIWKLVGRFXPHQW
/RFDWLRQ\RXUVLJQLQJORFDWLRQKHUH
'DWH
)R[LW3')(GLWRU9HUVLRQ
0DWW:LHQV
SFD 12/29/2021
Recommend granting diverter waiver:
Confirmed that there are at least 8 other
surface casing shoes set between -2287' and
-3010' TVDSS within 500' of the planned
surface casing shoe for CD2-361 at -2340'
TVDSS. No evidence of shallow drilling
hazards or shallow gas was found during
review of daily drilling operations reports from
13 offset wells. SFD 12/30/2021
DGLYHUWRUZDLYHU
7KH´[´,QWHUPHGLDWHVHFWLRQZLOOEHGULOOHGWR¶0'DQGODQGHGDWDQLQFOLQDWLRQRI$´OLQHUZLOOEHVHWDQG
FHPHQWHGIURP7'WRVHFXUHWKHVKRHLVRODWHWKH4DQQLNUHVHUYRLU
Qannik will be
cement isolated.
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 1 of 21 Printed: 29-Dec-21
&'
AOGCC Application for Permit to Drill Document
7DEOHRI&RQWHQWV
:HOO1DPH(Requirements of 20 AAC 25.005 (f)) ....................................................................................
/RFDWLRQ6XPPDU\(Requirements of 20 AAC 25.005(c)(2))
%ORZRXW3UHYHQWLRQ(TXLSPHQW,QIRUPDWLRQ(Requirements of 20 AAC 25.005(c)(3))
'ULOOLQJ+D]DUGV,QIRUPDWLRQRequirements of 20 AAC 25.005 (c)(4))
3URFHGXUHIRU&RQGXFWLQJ)RUPDWLRQ,QWHJULW\7HVWV
Requirements of 20 AAC 25.005 (c)(5))
&DVLQJDQG&HPHQWLQJ3URJUDP(Requirements of 20 AAC 25.005(c)(6))
'LYHUWHU6\VWHP,QIRUPDWLRQ(Requirements of 20 AAC 25.005(c)(7))
'ULOOLQJ)OXLG3URJUDPRequirements of 20 AAC 25.005(c)(8))
$EQRUPDOO\3UHVVXUHG)RUPDWLRQ,QIRUPDWLRQ(Requirements of 20 AAC 25.005 (c)(9))
6HLVPLF$QDO\VLV(Requirements of 20 AAC 25.005 (c)(10)
6HDEHG&RQGLWLRQ$QDO\VLV(Requirements of 20 AAC 25.005 (c)(11))
(YLGHQFHRI%RQGLQJ(Requirements of 20 AAC 25.005 (c)(12))
3URSRVHG'ULOOLQJ3URJUDP(Requirements of 20 AAC 25.005 (c)(13))
'LVFXVVLRQRI0XGDQG&XWWLQJV'LVSRVDODQG$QQXODU'LVSRVDO
(Requirements of 20 AAC 25.005 (c)(14))
$WWDFKPHQWV
Attachment 1 Cement Summary
Attachment 2 Drilling Hazards Summary
Attachment 3 Completion Schematic
Attachment 4 Property Plat
Attachment 5 Directional Plan CD2-361
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 2 of 21 Printed: 29-Dec-21
:HOO1DPH(Requirements of 20 AAC 25.005 (f))
7KHZHOOIRUZKLFKWKLVDSSOLFDWLRQLVVXEPLWWHGZLOOEHGHVLJQDWHGDV&58&'
/RFDWLRQ6XPPDU\(Requirements of 20 AAC 25.005(c)(2))
/RFDWLRQDW6XUIDFH(CD2-361 Slot)µ)1/
)(/6HF715(80
NAD27
Northings: 5,974,180
Eastings: 371,464
RKB Elevation ¶$06/
Pad Elevation ¶$06/
/RFDWLRQDW3URGXFWLYH+RUL]RQ+HHO
)1/
)(/6HF715(80
NAD27
Northings:5,992,432
Eastings: 362,020
Measured Depth, RKB: ¶
Total Vertical Depth, RKB: ¶
Total Vertical Depth, SS: ¶
/RFDWLRQDW7RWDO'HSWK7RH
)1/
)(/6HF715(80
NAD27
Northings: 6,000,899
Eastings: 357,798
Measured Depth, RKB: ¶
Total Vertical Depth, RKB: ¶
Total Vertical Depth, SS: ¶
Requirements of 20 AAC 25.050(b)
3OHDVHVHH$WWDFKPHQW&'ZS'LUHFWLRQDO3ODQ
7KH$SSOLFDQWLVWKHRQO\DIIHFWHGRZQHU
%ORZRXW3UHYHQWLRQ(TXLSPHQW,QIRUPDWLRQ(Requirements of 20 AAC 25.005(c)(3))
3OHDVHUHIHUHQFH%23DQGGLYHUWHUVFKHPDWLFVRQILOHIRU'R\RQ
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 3 of 21 Printed: 29-Dec-21
'ULOOLQJ+D]DUGV,QIRUPDWLRQRequirements of 20 AAC 25.005 (c)(4))
7KHIROORZLQJVKRZVWKHFDOFXODWLRQUHVXOWVRIDQWLFLSDWHGVXUIDFHSUHVVXUH$63ZKLOHGULOOLQJWKLVZHOO
&DVLQJ6L]H
LQ
&DVLQJ6HW'HSWK
0'79'IW
)UDFWXUH
*UDGLHQW
SSJ
3RUH
3UHVVXUH
SVL
$63'ULOOLQJ
SVL
1$
352&('85()25&$/&8/$7,1*$17,&3$7('685)$&(35(6685($63
$63LVGHWHUPLQHGDVWKHOHVVHURIVXUIDFHSUHVVXUHDWEUHDNGRZQRIWKHIRUPDWLRQFDVLQJVHDWZLWKD
JDVJUDGLHQWWRWKHVXUIDFHRUIRUPDWLRQSRUHSUHVVXUHDWWKHQH[WFDVLQJSRLQWOHVVDJDVJUDGLHQWWR
WKHVXUIDFHDVIROORZV
$63 >)*[@['
:KHUH $63 $QWLFLSDWHG6XUIDFHSUHVVXUHLQSVL
)* )UDFWXUHJUDGLHQWDWWKHFDVLQJVHDWLQOEJDO
&RQYHUVLRQIURPOEJDOWRSVLIW
*DVJUDGLHQWLQSVLIW
' WUXH9HUWLFDOGHSWKRIFDVLQJVHDWLQIW5.%
25
$63 )33±['
:KHUH )33 )RUPDWLRQ3RUH3UHVVXUHDWWKHQH[WFDVLQJSRLQW
)33 SVLIW[79'DERYH+5= SVLIWEHORZ+5=XQOHVVRWKHUZLVHVSHFLILHG
(A)ASP Calculations Per Interval
'ULOOLQJ%HORZ´&RQGXFWRU
$63 >)*[±@['
>[±@[ SVL
25
$63 )33±['
±[ SVL
'ULOOLQJ%HORZ´6XUIDFH&DVLQJ
$63 >)*[±@['
>[±@[¶ SVL
25
$63 )33±['
±[¶ SVL
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 4 of 21 Printed: 29-Dec-21
'ULOOLQJ%HORZ´,QWHUPHGLDWH'ULOOLQJ/LQHU
$63 >)*[±@['
>[±@[¶ SVL
25
$63 )33±['
±[¶ SVL
'ULOOLQJ%HORZ´,QWHUPHGLDWH3URGXFWLRQ/LQHU
$63 >)*[±@['
>[±@[ SVL
25
$63 )33±['
±[ SVL
'ULOOLQJ%HORZ´,QWHUPHGLDWH3URGXFWLRQ/LQHU
$63 >)*[±@['
>[±@[ SVL
25
$63 )33±['
±[ SVL
NOTE: 11.5ppg Kuparuk C Pressure
'ULOOLQJ%HORZ´,QWHUPHGLDWH3URGXFWLRQ/LQHU
$63 >)*[±@['
>[±@[ SVL
25
$63 )33±['
±[ SVL
NOTE: 11.5ppg Kuparuk C Pressure
(B) data on potential gas zones;
7KHZHOOERUHLVQRWH[SHFWHGWRSHQHWUDWHDQ\K\GUDWHVQRUJDV]RQHV
(C) data concerning potential causes of hole problems such as abnormally geo-pressured strata,
lost circulation zones, and zones that have a propensity for differential sticking;
3OHDVHVHH$WWDFKPHQW'ULOOLQJ+D]DUGV6XPPDU\
3URFHGXUHIRU&RQGXFWLQJ)RUPDWLRQ,QWHJULW\7HVWVRequirements of 20 AAC 25.005 (c)(5))
'ULOORXWFDVLQJRUOLQHUVKRHDQGSHUIRUP/27WHVWRU),7LQDFFRUGDQFHZLWKWKH&23(5'/27),7
SURFHGXUHWKDW&RQRFR3KLOOLSV$ODVNDKDVRQILOHZLWKWKH&RPPLVVLRQ
S
S
11.5ppg Kuparuk C Pressure
11.5ppg Kuparuk C Pressure
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 5 of 21 Printed: 29-Dec-21
&DVLQJDQG&HPHQWLQJ3URJUDP(Requirements of 20 AAC 25.005(c)(6))
&DVLQJDQG&HPHQWLQJ3URJUDP
Csg/Tbg
OD (in)
Hole
Size (in)
Weight
(lb/ft) Grade Conn. Length
(ft)
Top MD/TVD
(ft)
Btm MD/TVD
(ft) Planned Cement Program
;:HOGHG&HPHQWHGWR6XUIDFHZLWK
\GVVOXUU\
/+\GULO
:
&HPHQWWR6XUIDFHZLWK
V['HHS&5(7(/HDGDWSSJ
V[&ODVV*7DLODWSSJ
[
3
,&
+\GULO
:V[([WHQGHG&ODVV*/HDGDWSSJ
V[&ODVV*7DLODWSSJ
[
/
,&
+\GULO
:V[&ODVV*7DLODWSSJ
[
/+\GULO
:V[&ODVV*7DLODWSSJ
ò[
/+\GULO
:V[&ODVV*7DLODWSSJ
QD/+\GULO
:N/A – Upper Part of Tapered Upper
Completion Tubing String
QD/+\GULO
:N/A – Lower Part of Tapered Upper
Completion Tubing String
/+\GULO
:N/A – Uncemented Open Hole Liner w/
Pre-Perforated Pup Joints
'LYHUWHU6\VWHP,QIRUPDWLRQ(Requirements of 20 AAC 25.005(c)(7))
&3$,UHTXHVWVDYDULDQFHWRWKHGLYHUWHUUHTXLUHPHQWXQGHU$$&KEHJUDQWHG
&'PHHWVWKHUHTXLUHPHQWVDVRXWOLQHGEHORZ
1. The well is a development well drilled by Doyon 26 from an existing drill site.
D &'LVDGHYHORSPHQWZHOOEHLQJGULOOHGE\'R\RQIURP&'
2. At least one previously drilled borehole has penetrated the horizontal circle with a radius of 500
feet centered on the proposed location of the surface casing shoe of the well to be drilled.
D 7KHUHDUHHLJKWZHOOVZLWKLQD¶UDGLXVRIWKHSURSRVHG&'VXUIDFHVKRHDW
¶0'&'a¶&'a¶&'a¶&'a¶&'
a¶&'a¶&'a¶DQG&'a¶
3.There have been no significant gas shows or well control events while any borehole was drilled to
the depth of the surface casing shoe within the 500-foot radius circle.
D 7KHUHDUHILIW\WKUHHZHOOVZLWKLQD¶UDGLXVDFURVVWKH&'VXUIDFHKROHLQWHUYDO
7KHUHKDYHEHHQQRVLJQLILFDQWLQGLFDWLRQVRIVKDOORZJDVRUJDVK\GUDWHVZKLOHGULOOLQJ
IURP&'SDGLQFOXGLQJRQ&'ZKHUHDVXUIDFHKROHZDVGULOOHGWR¶79'LQ
g
ILIW\WKUHH ZHOOV
pp g
HLJKWZHOOVZLWKLQD¶UDGLXVRIWKHSURSRVHG &'VXUIDFHVKRH
QRVLJQLILFDQWLQGLFDWLRQVRIVKDOORZJDVRUJDVK\GUDWHVZKLOHGULOOLQJ
IURP&'SDGL
&3$,UHTXHVWVDYDULDQFHWRWKHGLYHUWHUUHTXLUHPHQW
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 6 of 21 Printed: 29-Dec-21
'ULOOLQJ)OXLG3URJUDPRequirements of 20 AAC 25.005(c)(8))
6XUIDFH,QWHUPHGLDWH
,QWHUPHGLDWH
,QWHUPHGLDWH
,QWHUPHGLDWH
3URGXFWLRQ
+ROH6L]Hin [[
[
[
&DVLQJ
6L]Hin
'HQVLW\ppg ±± ±±
39 cP ±± ±
<3
lb./
100
ft2
±± ± ±
,QLWLDO
*HOV
lb./
100
ft2
0LQXWH
*HOV
lb./
100
ft2
$3,)OXLG
/RVV
cc/
30
min
1&±
± ±
S+ ± ±±±
6XUIDFH+ROH
7KH6XUIDFHLQWHUYDOZLOOEHGULOOHGZLWKDPL[HGPHWDOR[LGHIUHVKZDWHUGULOOLQJIOXLG'5,/3/(;:%0
.HHSIORZOLQHYLVFRVLW\DWrVHFTWZKLOHGULOOLQJDQGUXQQLQJFDVLQJ5HGXFHYLVFRVLW\SULRUWR
FHPHQWLQJ0DLQWDLQPXGZHLJKWSSJWKURXJKWKHEDVHRI3HUPDIURVWDQGLQFUHDVHWRSSJSULRU
WR7'&RQWURO/*6XVLQJVROLGVFRQWUROV\VWHPDQGGLOXWLRQVZKHUHQHFHVVDU\
,QWHUPHGLDWH
7KH,QWHUPHGLDWHLQWHUYDOZLOOEHGULOOHGZLWKDIUHVKZDWHUJHOSRO\PHUGULOOLQJIOXLG/61':%0
(QVXUHJRRGKROHFOHDQLQJE\PD[LPL]LQJIOXLGDQQXODUYHORFLW\DQGURWDU\VSHHG0DLQWDLQPXGZHLJKW
IURP±SSJIRUVKDOORZLQVWDELOLW\DQGEHSUHSDUHGWRDGGORVVFLUFXODWLRQPDWHULDORUZHLJKWXS
DVQHHGHGIRUDFWXDO4DQQLNSRUHSUHVVXUH*RRGILOWHUFDNHTXDOLW\KROHFOHDQLQJDQGPDLQWHQDQFHRI
ORZJUDYLW\GULOOVROLGVE\GLOXWLQJDVUHTXLUHGZLOODOOEHLPSRUWDQWLQPDLQWDLQLQJJRRGKROHFRQGLWLRQV
,QWHUPHGLDWH
7KH,QWHUPHGLDWHLQWHUYDOZLOOEHGULOOHGZLWKDIUHVKZDWHUJHOSRO\PHUGULOOLQJIOXLG/61':%0
(QVXUHJRRGKROHFOHDQLQJE\PD[LPL]LQJIOXLGDQQXODUYHORFLW\DQGURWDU\VSHHG0DLQWDLQPXGZHLJKW
IURP±SSJIRULQVWDELOLW\03'PD\EHXVHGWRSUHYHQWF\FOLQJRQWKHIRUPDWLRQ*RRGILOWHUFDNH
TXDOLW\KROHFOHDQLQJDQGPDLQWHQDQFHRIORZJUDYLW\GULOOVROLGVE\GLOXWLQJDVUHTXLUHGZLOODOOEH
LPSRUWDQWLQPDLQWDLQLQJJRRGKROHFRQGLWLRQV
,QWHUPHGLDWH
7KH,QWHUPHGLDWHLQWHUYDOZLOOEHGULOOHGZLWKDQLQKLELWLYHVDOWGULOOLQJIOXLG./$6+,(/':%0WR
SURSHUO\FRQGLWLRQWKHKROHIRUWKHIORDWHGOLQHUUXQ(QVXUHJRRGKROHFOHDQLQJE\PD[LPL]LQJIOXLGDQQXODU
YHORFLW\DQGDGMXVWLQJGULOOLQJSDUDPHWHUV&RQGLWLRQWKHPXGXVLQJGLOXWLRQVDVUHTXLUHGWRPDLQWDLQORZ
JUDYLW\GULOOVROLGV:HLJKWXSWRSSJDW7'DQGDGMXVWWULSSLQJSDUDPHWHUVWRHQVXUHFOHDQKROH
SULRUWRIORDWLQJWKH´OLQHUWRERWWRP03'ZLOOXVHGRQWKLVKROHVHFWLRQWRPLQLPL]HF\FOLQJDQG
LPSURYHLQVWDELOLW\
M SS J S
03'ZLOOXVHGRQWKLVKROHVHFWLRQ
J
±SSJ
J
±SSJ
SSJSSJ
J
U ZHLJKWXS\
DVQHHGHGIRUDFWXDO4DQQLNSRUHSUHVVXUH
SSJ
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 7 of 21 Printed: 29-Dec-21
,QWHUPHGLDWH
7KH,QWHUPHGLDWHLQWHUYDOZLOOEHGULOOHGZLWKDQLQKLELWLYHVDOWGULOOLQJIOXLG./$6+,(/':%0WR
PLWLJDWHZHOOERUHLQVWDELOLW\DQGWRSURSHUO\FRQGLWLRQWKHKROHIRUWKHIORDWHGOLQHUUXQ(QVXUHJRRGKROH
FOHDQLQJE\PD[LPL]LQJIOXLGDQQXODUYHORFLW\7KHUHLVSRWHQWLDOIRUORVWFLUFXODWLRQVRHQVXUHDGHTXDWH
/&0PDWHULDOLVDYDLODEOHRQORFDWLRQWRDGGUHVVDQ\XQH[SHFWHGORVVHV*RRGILOWHUFDNHTXDOLW\KROH
FOHDQLQJDQGPDLQWHQDQFHRIORZJUDYLW\GULOOVROLGVE\GLOXWLQJDVUHTXLUHGZLOODOOEHLPSRUWDQWLQ
PDLQWDLQLQJJRRGKROHFRQGLWLRQV0LWLJDWHZHOOERUHLQVWDELOLW\ZLWK03'WDUJHWLQJaSSJ(0:DQG
/RZHU6KDOHVSHFLILFPXGDGGLWLYHV:HLJKWXSDVQHHGHGDW´VKRHWRWKHJUHDWHURISSJ
(0:IRUZHOOERUHLQVWDELOLW\PLWLJDWLRQRUDVQHHGHGIRU.XSDUXN&SRUHSUHVVXUH
3URGXFWLRQ+ROH
7KH3URGXFWLRQLQWHUYDOZLOOEHGULOOHGZLWKDZDWHUEDVHGGULOOLQIOXLG)/2352:%0ZHLJKWHG
DSSURSULDWHO\VRWKDW03'FDQSURYLGHDG\QDPLFRYHUEDODQFHRIaSSJ(0:ZKLOHUHGXFLQJWKHULVN
RIORVWFLUFXODWLRQFUHDWHGE\KLJK(&'V7KHUHLVSRWHQWLDOIRUORVWFLUFXODWLRQVRHQVXUHDGHTXDWH/&0
PDWHULDOLVDYDLODEOHRQORFDWLRQWRDGGUHVVDQ\ORVVHV7KHUHLVDSRWHQWLDOIRUDEQRUPDOSUHVVXUHVR
HQVXUHDGHTXDWHZHLJKWLQJPDWHULDOLVRQORFDWLRQWRZHLJKWXSDVQHHGHG.LOOZHLJKWEULQHZLOOEHSODFHG
LQWKHZHOOSULRUWRSXOOLQJRXWRIKROH
3OHDVHUHIHUHQFHSLWGLDJUDPRQILOHIRU'R\RQ$OOGULOOLQJIOXLGSUDFWLFHVZLOOEHLQDFFRUGDQFHZLWK
DSSURSULDWHUHJXODWLRQVVWDWHGLQ$$&
$EQRUPDOO\3UHVVXUHG)RUPDWLRQ,QIRUPDWLRQ(Requirements of 20 AAC 25.005 (c)(9))
1$$SSOLFDWLRQLVQRWIRUDQH[SORUDWRU\RUVWUDWLJUDSKLFWHVWZHOO
6HLVPLF$QDO\VLV(Requirements of 20 AAC 25.005 (c)(10)
1$$SSOLFDWLRQLVQRWIRUDQH[SORUDWRU\RUVWUDWLJUDSKLFWHVWZHOO
6HDEHG&RQGLWLRQ$QDO\VLV(Requirements of 20 AAC 25.005 (c)(11))
1$$SSOLFDWLRQLVQRWIRUDQRIIVKRUHZHOO
(YLGHQFHRI%RQGLQJ(Requirements of 20 AAC 25.005 (c)(12))
(YLGHQFHRIERQGLQJIRU&RQRFR3KLOOLSV$ODVND,QFLVRQILOHZLWKWKH&RPPLVVLRQ
ISSJSJS J
(0:IRUZHOOERUHLQVWDELOLW\PLWLJDWLRQRUDVQHHGHGIRU.XSDUXN&SRUHSUHVVXUH
J\ \JT S
0LWLJDWHZHOOERUHLQVWDELOLW\ZLWK03'WDUJHWLQJaSSJ(0:SJ
J
03'FDQSURYLGHDG\QDPLFRYHUEDODQFHRIaSSJ(0:ZKLOHUHGXFLQJWKHULVNSS S \ S
RIORVWFLUFXODWLRQFUHDWHGE\KLJK(&'V
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 8 of 21 Printed: 29-Dec-21
3URSRVHG'ULOOLQJ3URJUDP(Requirements of 20 AAC 25.005 (c)(13))
7KHSURSRVHGGULOOLQJSURJUDPLVOLVWHGEHORZ3OHDVHUHIHUWR&RPSOHWLRQ6FKHPDWLF
0,58'R\RQRQWR&58&'RYHUSUHLQVWDOOHG´[´LQVXODWHGFRQGXFWRU
'HZDWHUFHOODUULJXSULVHU WHVWVDPH
3LFNXSHQRXJK´9;GULOOSLSHWRGULOO685)VHFWLRQDQGUDFNEDFN
0DNHXS´&RQGXFWRU&OHDQ2XW%+$&OHDQRXWFRQGXFWRU
0DNHXS´685)'ULOOLQJ%+$(LMWD Program: GR/DIR)VSXGZHOO GLUHFWLRQDOO\GULOO´KROHWR685)7'
HVWLPDWHGDW¶0'¶79'WRSVHWWLQJWKH&DQGDVSHUWKHGLUHFWLRQDOSODQ±SSJ'5,/3/(;
:%0ZLOOEHXVHGWRGULOOWKHVHFWLRQ
&LUFXODWH FRQGLWLRQIORZFKHFNZHOODQG322+/D\GRZQ685)'ULOOLQJ%+$
5XQQHZ´/716(5685)FDVLQJFHQWUDOL]HGDVSHUGHVLJQWRVHFWLRQ7'&LUFXODWH FRQGLWLRQ
ODQGFDVLQJRQKDQJHUZLWKLQZHOOKHDGDQGEDFNRIIXSSHUKDOIRIODQGLQJMRLQW
3LFNXS 7,+ZLWKWKH685),QQHU6WULQJ%+$VWDELQWRWKHLQQHUVWULQJIORDWFROODUDQGHVWDEOLVKFLUFXODWLRQ
&HPHQWWKH´685)FDVLQJWRVXUIDFHDVSHUWKHFHPHQWSURJUDPZLWK¶RISSJ&ODVV*WDLODQG
SSJ'HHS&5(7(OHDGWRVXUIDFH%XPSLQQHUVWULQJGDUWVEOHHGSUHVVXUH FKHFNIORDWV
a. CONTINGENCY: If cement is not brought to surface, notify AOGCC and prepare for top job.
)ORZFKHFNZHOO1'IORZULVHU 18+35LVHU %23(ZLWKWKHIROORZLQJHTXLSPHQWFRQILJXUDWLRQ
D ´$QQXODU8SSHU´[´9%5%OLQG6KHDU5DP/RZHU´[´9%5
7HVW%23(WRSVLORZSVLKLJK7HVWDQQXODUWRSVLORZSVLKLJK(Provide 48 hr. AOGCC
notice)
3LFNXS 7,+ZLWKWKH´[´,1750'ULOOLQJ%+$(LMWD Program: GR/RES/DIR)
a. CONTINGENCY: If unable to clean-out SURF casing shoe track with INTRM1 Drilling BHA, drill out
SURF casing shoe track with dedicated SURF Casing Clean-Out BHA and perform FIT.
&KDUW´685)FDVLQJSUHVVXUHWHVWWRSVLIRUPLQXWHV
'ULOORXWVKRHWUDFN´UDWKROHDQG¶RIQHZKROH&LUFXODWH FRQGLWLRQ
3HUIRUP),7WRPLQLPXPSSJ(0:
'LVSODFHZHOOWRSSJ/61':%0
'LUHFWLRQDOO\GULOO´,17503LORW+ROHXQWLOWKHXQGHUUHDPHULVEHORZWKH´685)&DVLQJ6KRHDQGRSHQ
WKHXQGHUUHDPHU
'LUHFWLRQDOO\GULOO´[´,1750+ROHSDVWWKH%DVH4DQQLN &LUFXODWHDPLQLPXP[ERWWRP¶VXSDQGIORZ
FKHFNWKHZHOOWRGHWHUPLQHLIDGGLWLRQDORYHUEDODQFHLVQHHGHG
'LUHFWLRQDOO\GULOO´[´,1750+ROHWR,17507'DW¶0'¶79'DVSHUWKHGLUHFWLRQDO
SODQ&LUFXODWH FRQGLWLRQZKLOHZHLJKWLQJXSDVQHHGHGIRUDWULSPDUJLQ
2EVHUYHZHOOIRUIORZZKLOHURWDWLQJDWUSPWRDYRLGGLIIHUHQWLDOVWLFNLQJ
322+DQGOD\GRZQWKH´,1750'ULOOLQJ%+$
&KDQJH8SSHU´[´9%5VWR´6ROLG%RG\5DPV7HVWVDPHWRSVLORZSVLKLJK(Provide
48 hr. AOGCC notice)
5XQQHZ´3,&76+OLQHUFHQWUDOL]HGDVSHUGHVLJQ&LUFXODWH FRQGLWLRQSULRUWRH[LWLQJWKH
685)&DVLQJ6KRHDQGDJDLQEHIRUHPDNLQJXSWKH/LQHU+DQJHU
08WKH´[´,1750/LQHU+DQJHU5XQQLQJ7RRO$VVHPEO\DQG7,+ZLWKWKH´,1750OLQHUWRDERYH
UDWKROH2QFHWKHUHFLUFXODWH FRQGLWLRQDVQHHGHGLQSUHSDUDWLRQIRUWKHFHPHQWMRE
&HPHQWWKH´,1750OLQHUZLWKVXIILFLHQWSSJ([WHQGHG&ODVV*OHGWRSURYLGH¶LVRODWLRQDERYHWKH
7RS4DQQLNDQGD¶SSJWDLOWRWDFNWKH´,1750/LQHU6KRH%XPSSOXJVWRSVLRYHUFLUFXODWLQJ
SUHVVXUHEOHHGSUHVVXUH FKHFNIORDWV
a. CONTINGENCY: If cement is not circulated above the Qannik, drill, case, cement INTRM2. Intrm 1 is a
drilling liner and will be covered by Intrm 2 long string.
6HWWKH´[´7,:;3$./LQHU+DQJHU3HUIRUPRYHUSXOOWHVWWRFRQILUPKDQJHUVHW
Indications of improper cementing may require a cement quality log. (20 AAC 25.030(d)(5))
LOT.
4000 psi
4000 psi
(LMWD Program: GR/RES/DIR)
(LMWD Program: GR/D
Min rqd to drill ahead.
SURYLGH¶LVRODWLRQDERYHWKH
7RS4DQQLND
Cement job results & interpretation due to AOGCC as soon as available.
Refer to AOGCC Industry Guidance Bulletin 13-01:Remedial Cementing for Surface Casing.VTL 1/12/22
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 9 of 21 Printed: 29-Dec-21
3HUIRUP/LQHU7RSWHVWWRSVL
3LFNXSWRUHOHDVHUXQQLQJWRROVIURP/LQHU+DQJHU&LUFXODWH FRQGLWLRQ)ORZFKHFNZHOO
72+RQHOHYDWRUV/D\GRZQ,1750/LQHU5XQQLQJ7RROV
&KDQJH´6ROLG%RG\5DPVEDFNWR´[´9%5V7HVWVDPHWRSVL(Provide 48 hr.
AOGCC notice)
3LFNXS 7,+ZLWK´,1750&OHDQ2XW%+$WRWKH´,1750/LQHUWRS
&LUFXODWH FRQGLWLRQGULOORXWSDFNRIIEXVKLQJEHORZ/LQHU+DQJHUFLUFXODWHERWWRP¶VXSDQGFRQWLQXH7,+
&KDUW´FDVLQJ[´OLQHUSUHVVXUHWHVWWRSVLIRUPLQXWHV
'ULOORXWVKRHWUDFN´[´UDWKROHDQG¶RI ô´QHZKROH&LUFXODWH FRQGLWLRQ
3HUIRUP),7WRPLQLPXPSSJ(0:
&LUFXODWH FRQGLWLRQREVHUYHZHOOIRUIORZDQG72+/D\GRZQWKH´,1750&OHDQ2XW%+$
3LFNXS 7,+ZLWK´[´,1750'ULOOLQJ%+$WRWKH´,1750/LQHU6KRH(LMWD Program:
GR/RES/DIR)
'LVSODFHWKHZHOOWRSSJ/61':%0
2SHQXQGHUUHDPHUDQGGLUHFWLRQDOO\GULOO´[´,1750KROHWR7'DW¶0'
D 7KLVKROHVHFWLRQLVWKHXSSHUSDUWRIWKHRULJLQDOVWULQJ,17KROHVHFWLRQWKHGULOOLQJWULSSLQJRXWWLPH
LVHVWLPDWHGWREHRYHUGD\V7RDYRLGWKHKLJKULVNRIVWXFNSLSH&RQRFR3KLOOLSVLVUHTXHVWLQJWR
FRQWLQXHWKHDSSURYHG(YHQW%DVHG%23WHVWLQJVFKHGXOHIURPRULJLQDO,173HUIRUPIXOO%23WHVW
RQFH%+$RXWRIKROH
322+DQGOD\GRZQ´[´,1750'ULOOLQJ%+$
&KDQJH8SSHU´[´9%5VWR´6ROLG%RG\5DPV7HVWVDPHWRSVLORZSVLKLJK
(Provide 48 hr. AOGCC notice)
)ORDWQHZ´/,&76+,1750&DVLQJFHQWUDOL]HGDVSHUGHVLJQWR7'DWWHPSWWRUXQRQ
HOHYDWRUVDQGURWDWHRQO\LIQHHGHGWRPRYHSDVWDOHGJHRUWREUHDND[LDOIULFWLRQ
&LUFXODWH FRQGLWLRQLQSUHSDUDWLRQIRUWKHFHPHQWMRE
&HPHQWWKH´,1750OLQHUZLWKVXIILFLHQWSSJ&ODVV*WRWDFNWKH,1750FDVLQJVKRHZLWK¶79'
VOXUU\
,QVWDOOSDFNRIIDQGGLVSODFHWKH´[´[´DQQXOXVWRFRUURVLRQLQKLELWHGVHDZDWHUDQGGLHVHOIUHH]H
SURWHFW
&KDQJH´VROLGERG\UDPVEDFNWR´[´9%5V7HVWVDPHWRSVL(Provide 48 hr.
AOGCC notice)
3LFNXS 7,+ZLWK´[´,1750'ULOOLQJ%+$(LMWD Program: GR/RES/NEU/DEN/SON/DIR)
&KDUW´,1750FDVLQJSUHVVXUHWHVWWRSVLIRUPLQXWHV
'ULOORXWVKRHWUDFN´[´UDWKROHDQG¶RIQHZ´KROH
3HUIRUP),7WRPLQLPXPSSJ(0:
'LVSODFHZHOOWRSSJ./$6+,(/':%0
'LUHFWLRQDOO\GULOO[´QHZ,1750KROHWR7'¶79'EHORZWKH7RS+5=HVWLPDWHGDW¶0'
¶79'
D 7KLVKROHVHFWLRQLVWKHORZHUSDUWRIWKHRULJLQDOVWULQJ,17KROHVHFWLRQWKHGULOOLQJWULSSLQJRXWWLPH
LVHVWLPDWHGWREHRYHUGD\V7RDYRLGWKHKLJKULVNRIVWXFNSLSH&RQRFR3KLOOLSVLVUHTXHVWLQJWR
FRQWLQXHWKHDSSURYHG(YHQW%DVHG%23WHVWLQJVFKHGXOHIURPRULJLQDO,173HUIRUPIXOO%23WHVW
RQFH%+$RXWRIKROH
&LUFXODWH FRQGLWLRQKROHZKLOHZHLJKWLQJXSWRSSJ2EVHUYHZHOOIRUIORZ
322+DQGOD\GRZQ[´,1750'ULOOLQJ%+$
&KDQJH8SSHU´[´9%5VWR´6ROLG%RG\5DPV7HVWVDPHWRSVLORZSVLKLJK
(Provide 48 hr. AOGCC notice)
(LMWD Program: GR/RES/NEU/DEN/SON/DIR)
min rqd
LOT
(LMWD Program:S
GR/RES/DIR)
Cement job results & interpretation due to AOGCC as soon as available.
4000 psi
4000 psi
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 10 of 21 Printed: 29-Dec-21
)ORDW´/76+QHZ,1750/LQHUFHQWUDOL]HGDVSHUGHVLJQWR7'&HPHQWWKHVDPHZLWK
SSJ&ODVV*WR¶79'DERYHWKHVKRH
6HWWKH/LQHU+DQJHU7HVWWKHEDFNVLGHWRSVLIRULQWHJULW\
322+DQG/'OLQHUKDQJHUUXQQLQJWRRO
&KDQJH8SSHUEDFNWR´[´9%5V7HVWVDPHWRSVLORZSVLKLJK(Provide 48 hr. AOGCC
notice)
3UHVVXUHWHVWVWKH´OLQHUDQG´FDVLQJWRSVLIRUPLQXWHV
3LFNXS 7,+ZLWK´[´,1750'ULOOLQJ%+$(LMWD Program: GR/RES/NEU/DEN/SON/DIR)
D 72&ZLOOEHORJJHGZLWK6RQLFWRRO
'LVSODFHZHOOWRSSJ.OD6KLHOG
'ULOORXWVKRHWUDFNDQG¶RIQHZKROH3HUIRUP),7WRPLQLPXPSSJ(0:
'LUHFWLRQDOO\GULOO´[´KROHWRVHFWLRQ7'ZLWKLQWKH)LRUG:HVW.XSDUXN&DW¶0'¶79'
XVLQJ03'WRWDUJHWSSJ(0:DW¶79'
622+WR´VKRH
&LUFXODWH ZHLJKWXSWKHPXGWRSSJNLOOZHLJKW./$6+,(/':%0
)ORZFKHFN622+DQGOD\GRZQ´[´'ULOOLQJ%+$
5XQQHZ´/76+,1750/LQHUWR7'
&HPHQWWKH´OLQHUZLWKSSJWDLO&ODVV*WR¶79'DERYHWKHWRSRI.XSDUXN&UHVHUYRLU
6HWOLQHUKDQJHUDQGSHUIRUPSVLEDFNSUHVVXUHWHVW
322+DQG/'OLQHUKDQJHUUXQQLQJWRRO
3UHVVXUHWHVW´[´[´/LQHUSUHVVXUHWHVWWRSVLIRUPLQXWHV
3LFNXS 7,+ZLWK´352''ULOOLQJ$VVHPEO\(LMWD Program: GR/RES/NEU/DEN/DIR)
'LVSODFHZHOOWRQHZSSJ)/2352:%0
'ULOORXWVKRHWUDFN´[´UDWKROHDQG¶RIQHZKROH3HUIRUP),7WRPLQLPXPRISSJ(0:
'LUHFWLRQDOO\GULOOKROHWRWKH3URGXFWLRQ7'DW¶0'JHRVWHHULQJWRVWD\ZLWKLQWKH.XSDUXN&ZKLOH
XVLQJ03'WRWDUJHW(0:DW´6KRH
&LUFXODWH FRQGLWLRQ%522+WRWKH´,1750OLQHUVKRHDQGIXUWKHUDVQHHGHGWRFOHDQXSWKHZHOO
6WULSLQEDFNWRERWWRP
&LUFXODWH FRQGLWLRQGLVSODFHZHOOWRNLOOZHLJKWEULQHIORZFKHFN 72+/D\GRZQ´352''ULOOLQJ%+$
5XQQHZ´/76+/LQHUZLWKSUHSHUIRUDWHGSXSVFHQWUDOL]HGDVSHUGHVLJQ
3LFNXSWKH´[´/LQHU+DQJHU3DFNHUZLWK5XQQLQJ7RRO$VVHPEO\WRWKH5LJ)ORRU0DNHXSWRWKH
OLQHUKDQJHU
7,+ZLWK´352'/LQHUURWDWHDVQHHGHGWRUHGXFHD[LDOIULFWLRQDQGUXQWR7'&LUFXODWHDVQHHGHGWKURXJK
WKHRSHQFLUFXODWLRQVXE
:LWKWKHOLQHURQERWWRPVHWWKHOLQHUWRSSDFNHUDVSHUHTXLSPHQWVSHFV
5HOHDVHUXQQLQJWRROVSHUIRUPaSVLOLQHUWRSWHVWWRFRQILUPSDFNHU OLQHUEDUULHULQWHJULW\
72+RQHOHYDWRUV/D\GRZQ352'/LQHU5XQQLQJ7RROV
5XQ´[´8SSHU&RPSOHWLRQZLWKVPDUWJDVOLIWPDQGUHOV6SDFHRXWSLFNXS ZLWKWKHDQQXODUFORVHGRQ
ODQGLQJVWULQJVSRWGLHVHOIUHH]HSURWHFW/DQGWXELQJKDQJHU SUHVVXUHXSWRVHWSDFNHU&RQILUPFRQQHFWLYLW\
WRVPDUW*/0V
,QVWDOO%39DQGSUHVVXUHWHVWKDQJHUVHDOVWRSVLFKDUWWHVW
1LSSOHGRZQ%23(
,QVWDOOWXELQJKHDGDGDSWHUDVVHPEO\DQGWUHH3UHVVXUHWHVWVDPHWRSVLFKDUWWHVW5HPRYH%39
7HVWWXELQJDQGWXELQJFDVLQJDQQXOXVVHSDUDWHO\WRSVLPLQVFKDUWWHVWV
(LMWD Program: GR/RES/NEU/DEN/SON/DIR)
Indications of improper cementing may require a cement quality log.(20 AAC 25.030(d)(5))
(LMWD Program: GR/RES/NEU/DEN/DIR)
Cement job results & interpretation due to AOGCC as soon as available.
Cement job results & interpretation due to AOGCC as soon as available.
Indications of improper cementing may require a cement quality log.
(20 AAC 25.030(d)(5))
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 11 of 21 Printed: 29-Dec-21
6KHDUFLUFXODWLRQYDOYHLQ*/0&LUFXODWHWXELQJWRGLHVHO IUHH]HSURWHFWDQQXOXV
6HW%39DQGVHFXUHZHOO5'02'R\RQ
32675,*±2SV
D 3UHVVXUHXSWRFRQYHUWIORWDWLRQEDUULHUGLVN XQORDGZHOO
'LVFXVVLRQRI0XGDQG&XWWLQJV'LVSRVDODQG$QQXODU'LVSRVDO
(Requirements of 20 AAC 25.005 (c)(14))
,QFLGHQWDOIOXLGVGHYHORSHGIURP&'GULOOLQJRSHUDWLRQVZLOOEHKDXOHGWRWKH$OSLQH*ULQG ,QMHFW
)DFLOLW\DQGLQMHFWHGLQWRWKHGHGLFDWHG&ODVVGLVSRVDOZHOO&'$RQ&'3DG
%HFDXVHRIWKH´,QWHUPHGLDWH/LQHU+DQJHUEORFNLQJWKH´6XUIDFH&DVLQJ6KRH&'LVQRWD
FDQGLGDWHIRUIXWXUHDQQXODUGLVSRVDO
$WWDFKPHQWV
Attachment 1 Cement Summary
Attachment 2 Drilling Hazards Summary
Attachment 3 Completion Schematic
Attachment 4 Directional Plan
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 12 of 21 Printed: 29-Dec-21
$WWDFKPHQW±&HPHQW6XPPDU\
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 13 of 21 Printed: 29-Dec-21
´6XUIDFH&DVLQJWR¶0'¶79'
&HPHQWIURP¶WR
0'¶ZLWKSSJ&ODVV*WDLODQGIURP
WRVXUIDFHZLWK
SSJ'HHS&5(7(OHDG$VVXPHH[FHVVDQQXODUYROXPHLQ3HUPDIURVWH[FHVVEHORZ
WKH3HUPDIURVWDQGQRH[FHVVZLWKLQWKH´FRQGXFWRU
/HDG6OXUU\IURP¶0'WR6XUIDFHZLWKSSJ'HHS&5(7(
&RQGXFWRU ¶±¶;IWIW;H[FHVV IW
3HUPDIURVWWR&RQGXFWRU ¶±¶;IWIW;H[FHVV IW
7RSRI7DLOWR3HUPDIURVW ¶±¶;IWIW;H[FHVV IW
7RWDO9ROXPH IW !V[RISSJ'HHS&5(7(#IWVN
7DLO6OXUU\IURP¶0'WR¶0'ZLWKSSJ&ODVV*DGGLWLYHV
6KRHWR7RSRI7DLO ¶±;IWIW;H[FHVV IW
6KRH-RLQWV ¶;IWIW;H[FHVV IW
7RWDO9ROXPH IW !V[RISSJ&ODVV*DGGLWLYHV#IWVN
´,QWHUPHGLDWH/LQHUWR¶0'¶79'
&HPHQWIURP¶WR¶0'¶ZLWKSSJ&ODVV*WDLODQGIURP¶WR¶79'!
¶0'DERYHWKHWRSRIWKH.4DQQLNUHVHUYRLUZLWKSSJ([WHQGHG&ODVV*OHDGDVVXPLQJ
H[FHVVDQQXODUYROXPH
/HDG6OXUU\IURP¶0'WR¶0'ZLWKSSJ([WHQGHG&ODVV*DGGLWLYHV
7RSRI7DLOWR¶79'$ERYH
.4DQQLN7RSDW¶0'¶±¶;IWIW;H[FHVV IW
7RWDO9ROXPH IW !V[RISSJ([WHQGHG&ODVV*DGGLWLYHV#IWVN
7DLO6OXUU\IURP¶0'WR¶0'ZLWKSSJ&ODVV*DGGLWLYHV
6KRHWR7RSRI7DLO ¶±¶;IWIW;H[FHVV IW
6KRH-RLQWV¶;IWIW;H[FHVV IW
7RWDO9ROXPH IW !V[RISSJ&ODVV*DGGLWLYHV#IWVN
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 14 of 21 Printed: 29-Dec-21
´,QWHUPHGLDWH&DVLQJWR¶0'¶79'
&HPHQWIURP¶WR¶79'DERYHOLQHUVKRH ZLWKSSJ&ODVV*DVVXPLQJH[FHVV
DQQXODUYROXPH
&HPHQWIURP¶0'WR¶0'ZLWKSSJ&ODVV*DGGLWLYHV
6KRHWR7RSRI&HPHQW ¶±¶;IWIW;H[FHVV IW
6KRH-RLQW ¶;IWIW;H[FHVV IW
7RWDO9ROXPH IW !V[RISSJ&ODVV*DGGLWLYHV#IWVN
´,QWHUPHGLDWH/LQHUWR¶0'¶79'
&HPHQWIURP¶WR¶79'DERYHWKH.XSDUXN&ZLWKSSJ&ODVV*DVVXPLQJH[FHVV
DQQXODUYROXPH
&HPHQWIURP¶0'WR¶0'ZLWKSSJ&ODVV*DGGLWLYHV
6KRHWR7RSRI&HPHQW ¶±¶;IWIW;H[FHVV IW
6KRH-RLQW ¶;IWIW;H[FHVV IW
7RWDO9ROXPH IW !V[RISSJ&ODVV*DGGLWLYHV#IWVN
´,QWHUPHGLDWH/LQHUWR¶0'¶79'
*Due to high angle and short open hole section the required 250’ TVD TOC is above our liner hanger
and in the shoe of the 9 7/8” casing. This is a high risk as our liner hanger is set against the plugs. If
the plugs don’t bump we have to wait on cement.
Intrm 4 is a drilling liner. A cement Intrm 3 shoe and Intrm 4 packer test provide isolation of the
formation.
&23UHTXHVWWRXVHWKH¶0'ࡱRSHQKROHYROXPH
&HPHQWIURP¶0'WR¶0'ZLWKSSJ&ODVV*DGGLWLYHV
6KRHWR7RSRI&HPHQW ¶±¶;IWIW;H[FHVV IW
6KRH-RLQW¶;IWIW;H[FHVV IW
7RWDO9ROXPH IW !V[RISSJ&ODVV*DGGLWLYHV#IWVN
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 15 of 21 Printed: 29-Dec-21
$WWDFKPHQW±'ULOOLQJ+D]DUGV6XPPDU\
7REHSRVWHGLQ5LJ)ORRU'RJKRXVH3ULRUWR6SXG
+ROH´&DVLQJ,QWHUYDO
(YHQW5LVN/HYHO0LWLJDWLRQ6WUDWHJ\
&RQGXFWRU%URDFK/RZ0RQLWRUFHOODUFRQWLQXRXVO\GXULQJLQWHUYDO
:HOO&ROOLVLRQ +LJK
&ORVHO\PRQLWRUWUDYHOLQJF\OLQGHUXSGDWHDV
QHHGHG8WLOL]HJ\URHTXLSPHQWDVQHHGHGWRYHULI\
ZHOOERUHORFDWLRQ&ORVHO\IROORZ&3$,$QWL
&ROOLVLRQSROLFLHV6KXWLQRIIVHWZHOOVDVUHTXLUHG
5LJXSGLYHUWHUIRUFROOLVLRQULVNPLWLJDWLRQ
*DV+\GUDWHV /RZ
'LYHUWHUGULOOVDQGLIREVHUYHG±FRQWUROGULOOUHGXFH
SXPSUDWHVDQGFLUFXODWLQJWLPHUHGXFHPXG
WHPSHUDWXUHV6KDOORZKD]DUGVWXG\QRWHGPLQLPDO
ULVNRQ&'SDG
$EQRUPDO3UHVVXUHLQ
6XUIDFH)RUPDWLRQV/RZ'LYHUWHUGULOOVLQFUHDVHGPXGZHLJKW6KDOORZ
KD]DUGVWXG\QRWHGPLQLPDOULVNRQ&'SDG
$EQRUPDO3UHVVXUHLQ&
&'$QQXODU,QMHFWLRQ/RZ
7RSVHW&IRUPDWLRQ1RDQQXODULQMHFWLRQ
SHUIRUPHGRQSDGVLQFHQRUDEQRUPDO
SUHVVXUHHQFRXQWHUHGLQ&RQ&'
&OD\%DOOLQJ +LJK
0DLQWDLQSODQQHGPXGSDUDPHWHUVDQGIORZUDWHV
8VHSURDFWLYHDQWLEDOOLQJVZHHSVDQGPXG
SURGXFWDGGLWLRQV
/RVW&LUFXODWLRQ /RZ
5HGXFHSXPSUDWHVPXGUKHRORJ\DGGORVW
FLUFXODWLRQPDWHULDO FRQWUROSLSHUXQQLQJVSHHGV
´[´+ROH´/LQHU,QWHUYDO
(YHQW5LVN/HYHO0LWLJDWLRQ6WUDWHJ\
/RVW&LUFXODWLRQ 0HGLXP
5HGXFHSXPSUDWHVUHGXFHWULSVSHHGVPRQLWRU
UHDOWLPH(&'VDGMXVWPXGUKHRORJ\DQGDGGORVW
FLUFXODWLRQPDWHULDODVQHHGHG
$EQRUPDO3UHVVXUHLQ
4DQQLN+LJK
(PSOR\4DQQLN3UHVVXUH0DQDJHPHQW3ODQ
3HUIRUPZHOOFRQWUROGULOOVIORZFKHFNDVQHHGHG
03'ILQJHUSULQWLISRVVLEOHLQFUHDVHPXGZHLJKW
$EQRUPDO3UHVVXUHLQ
2YHUEXUGHQ)RUPDWLRQV/RZ3HUIRUPZHOOFRQWUROGULOOVFKHFNIRUIORZGXULQJ
FRQQHFWLRQVDQGLQFUHDVHPXGZHLJKWDVQHHGHG
+ROH&OHDQLQJ /RZ
0RQLWRU(&'DQGWRUTXHGUDJWUHQGVFRQWUROGULOO
DQGXVHEHVWKROHFOHDQLQJSUDFWLFHVDQG
EDFNUHDPWRFOHDQKROHSULRUWROLQHUUXQ
6ZDEELQJRQ7ULSV 0HGLXP
5HGXFHWULSVSHHGVFRQGLWLRQPXGSURSHUWLHV
PRQLWRUKROHILOOSXPSRXWRIKROHPRQLWRUUHDOWLPH
(&'VDQGXVH03'LISRVVLEOH
'LIIHUHQWLDO6WLFNLQJ 0HGLXP
0RQLWRUIRUVHHSDJHORVVHVPRQLWRUVWDWLF7 '
IRUFHVUXQ/&0DVQHHGHGDQGHPSOR\SURSHU
FHQWUDOL]DWLRQWRSURYLGHVHPLIOXVKOLQHUVWDQGRII
4DQQLN&HPHQW,VRODWLRQ0HGLXP
&HQWUDOL]HIRU!6WDQG2IIXVH/HDG7DLO
VOXUU\GHVLJQWRUHGXFH(&'VFUHDWHPXGVSDFHU
VOXUU\WUDLQWRDOORZHIIHFWLYHGLVSODFHPHQWDQGEH
SUHSDUHGIRUOLQHUWRSVTXHH]HFRQWLQJHQF\
03'ILQJHUSULQWLISRVVLEOH
4DQQLN3UHVVXUH0DQDJHPHQW3ODQ
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 16 of 21 Printed: 29-Dec-21
´[´+ROH´/LQHU,QWHUYDO
(YHQW5LVN/HYHO0LWLJDWLRQ6WUDWHJ\
+ROH&OHDQLQJ /RZ
0RQLWRU(&'DQGWRUTXHGUDJWUHQGVFRQWUROGULOO
XVHEHVWKROHFOHDQLQJSUDFWLFHVDQGEDFNUHDPWR
FOHDQKROHSULRUWROLQHUUXQ
%+$)DLOXUH 0HGLXP3URDFWLYHO\SODQ%+$WULSWRDOORZIRUWRROZHDU
HYDOXDWLRQDQGPRQLWRUVKRFNDQGYLEUDWLRQ
/RVW&LUFXODWLRQ 0HGLXP
5HGXFHSXPSUDWHVUHGXFHWULSVSHHGVUHDOWLPH
(&'PRQLWRULQJPXGUKHRORJ\DGGORVWFLUFXODWLRQ
PDWHULDODVQHHGHG
&DVLQJ:HDU 0HGLXP0RGHOSUHYLRXVOLQHUFDVLQJZHDUKDYH15'33V
DYDLODEOH XVH&3$,FDVLQJZHDUEHVWSUDFWLFHV
6WXFN3LSH 0HGLXP
8VHJRRGGULOOLQJSUDFWLFHVPRQLWRU7 'WUHQGV
UXQ%+$GLVFRQQHFWVXELIQHFHVVDU\KDYHILVKLQJ
NLWSUHLGHQWLILHG
'LIIHUHQWLDO6WLFNLQJ 0HGLXP
0RQLWRUIRUVHHSDJHORVVHVUXQ/&0DVQHHGHG
PRQLWRUVWDWLF7 'IRUFHVFHQWUDOL]HOLQHUDV
QHHGHGWRSUHYHQWGLIIHUHQWLDOVWLFNLQJ
)ORDWHG/LQHU5XQ +LJK
(PSOR\&'DQG&'/HVVRQV/HDUQHG
LPSOHPHQWIORWDWLRQVSHFLILFZHOOFRQWUROGULOOV XVH
IORDWHGOLQHUGHFLVLRQWUHHIRULVVXHVHQFRXQWHUHG
´[´+ROH´/LQHU,QWHUYDO
(YHQW5LVN/HYHO0LWLJDWLRQ6WUDWHJ\
+ROH&OHDQLQJ /RZ
0RQLWRU(&'DQGWRUTXHGUDJWUHQGVFRQWUROGULOO
XVHEHVWKROHFOHDQLQJSUDFWLFHVDQGEDFNUHDPWR
FOHDQKROHSULRUWROLQHUUXQ
%+$)DLOXUH 0HGLXP3URDFWLYHO\SODQ%+$WULSWRDOORZIRUWRROZHDU
HYDOXDWLRQDQGPRQLWRUVKRFNDQGYLEUDWLRQ
/RVW&LUFXODWLRQ 0HGLXP
5HGXFHSXPSUDWHVUHGXFHWULSVSHHGVUHDOWLPH
(&'PRQLWRULQJPXGUKHRORJ\DGGORVWFLUFXODWLRQ
PDWHULDODVQHHGHG
&DVLQJ:HDU 0HGLXP0RGHOSUHYLRXVOLQHUFDVLQJZHDUKDYH15'33V
DYDLODEOH XVH&3$,FDVLQJZHDUEHVWSUDFWLFHV
6WXFN3LSH 0HGLXP
8VHJRRGGULOOLQJSUDFWLFHVPRQLWRU7 'WUHQGV
UXQ%+$GLVFRQQHFWVXELIQHFHVVDU\KDYHILVKLQJ
NLWSUHLGHQWLILHG
'LIIHUHQWLDO6WLFNLQJ 0HGLXP
0RQLWRUIRUVHHSDJHORVVHVUXQ/&0DVQHHGHG
PRQLWRUVWDWLF7 'IRUFHVFHQWUDOL]HOLQHUDV
QHHGHGWRSUHYHQWGLIIHUHQWLDOVWLFNLQJ
)ORDWHG/LQHU5XQ +LJK
(PSOR\&'DQG&'/HVVRQV/HDUQHG
LPSOHPHQWIORWDWLRQVSHFLILFZHOOFRQWUROGULOOV XVH
IORDWHGOLQHUGHFLVLRQWUHHIRULVVXHVHQFRXQWHUHG
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 17 of 21 Printed: 29-Dec-21
´[´+ROH´/LQHU,QWHUYDO
(YHQW5LVN/HYHO0LWLJDWLRQ6WUDWHJ\
:HOOERUH,QVWDELOLW\ +LJK
,VRODWHGLQVWDEOHVKDOHVZLWKGHGLFDWHGKROH
VHFWLRQHPSOR\&'DQG&'LQVWDELOLW\
PLWLJDWLRQVXQGHUUHDPHUSURSHU(0:WRSUHYHQW
VKHDUIDLOXUH03' LQKLELWHGIOXLGPRQLWRUUHDO
WLPHGULOOLQJGDWD8VH&3$,/RZHU6KDOHLQVWDELOLW\
PLWLJDWLRQGULOOLQJEHVWSUDFWLFHV
/RVW&LUFXODWLRQ +LJK
5HGXFHSXPSUDWHVUHGXFHWULSVSHHGVUHDOWLPH
(&'PRQLWRULQJPXGUKHRORJ\DGGORVWFLUFXODWLRQ
PDWHULDODVQHHGHG8VH03'WRUHGXFH(&'V
$EQRUPDO5HVHUYRLU
3UHVVXUH+LJK
:HOOFRQWUROGULOOVIORZFKHFNGXULQJFRQQHFWLRQV
XVH03'WRILQJHUSULQWSURYLGHG\QDPLF
RYHUEDODQFHLQFUHDVHPXGZHLJKWDVQHHGHGWR
PDLQWDLQRYHUEDODQFHGXULQJWULSSLQJDFWLYLWLHV
/DQGLQJLQ7KLQ.XSDUXN&+LJK
8VH&'DQG&'GDWDWRUHGXFHGHSWK
XQFHUWDLQW\8VH8OWUD'HHS$]LPXWKDO5HVLVWLYLW\
WRLGHQWLI\.XSDUXN&DQGDVVLVWZLWKDGMXVWLQJ
ODQGLQJ
6ZDEELQJRQ7ULSV 0HGLXP
5HGXFHWULSVSHHGVFRQGLWLRQPXGSURSHUWLHV
SURSHUKROHILOOLQJSXPSRXWRIKROHUHDOWLPH(&'
PRQLWRULQJ XVH03'LISRVVLEOH
&HPHQWDURXQGOLQHU
KDQJHUIURP¶79'
UHJXDOWLRQ
+LJK
'XHWRKLJKDQJOHDQGVKRUWRSHQKROHVHFWLRQWKH
UHTXLUHG¶79'72&LVDERYHRXUOLQHUKDQJHU
DQGLQWKHVKRHRIWKH´FDVLQJ7KLVLVDKLJK
ULVNDVRXUOLQHUKDQJHULVVHWDJDLQVWWKHSOXJV,I
WKHSOXJVGRQ¶WEXPSZHKDYHWRZDLWRQFHPHQW
5HGXFHFHPHQWFROXPQWR¶0'RURIWKH
RSHQKROHYROXPH
%DULWH6DJ +LJK
8VHXOWUDILQHEDULWHWRUHGXFHVDJULVN(PSOR\
EDULWHVDJPLWLJDWLRQEHVWSUDFWLFHV
´+ROH´3UH3HUIRUDWHG/LQHU,QWHUYDO
(YHQW5LVN/HYHO0LWLJDWLRQ6WUDWHJ\
/RVW&LUFXODWLRQ 0HGLXP
5HGXFHSXPSUDWHVUHGXFHWULSVSHHGVUHDOWLPH
(&'PRQLWRULQJPXGUKHRORJ\DGGORVWFLUFXODWLRQ
PDWHULDODVQHHGHG8VH03'WRUHGXFH(&'V
$EQRUPDO5HVHUYRLU
3UHVVXUH+LJK
:HOOFRQWUROGULOOVIORZFKHFNGXULQJFRQQHFWLRQV
XVH03'WRILQJHUSULQWSURYLGHG\QDPLF
RYHUEDODQFHLQFUHDVHPXGZHLJKWDVQHHGHGWR
PDLQWDLQRYHUEDODQFHGXULQJWULSSLQJDFWLYLWLHV
6WD\LQJLQ.XSDUXN&+LJK
8VHJHRVWHHULQJEHVWSUDFWLFHVIURPRIIVHW1DQXT
.XSDUXN&XVH'HHS5HDGLQJ$]LPXWKDO
5HVLVWLYLW\WRROWRDVVLVWZLWKUHVHUYRLU
LQWHUSUHWDWLRQDQGFUHDWHGHFLVLRQWUHHUHVSRQGLQJ
WRIRUUHVHUYRLUH[FXUVLRQV
:HOOERUH,QVWDELOLW\+LJK
(PSOR\&'DQG&'LQVWDELOLW\
PLWLJDWLRQVXQGHUUHDPHUSURSHU(0:WRSUHYHQW
VKHDUIDLOXUH03' LQKLELWHGIOXLGPRQLWRUUHDO
WLPHGULOOLQJGDWD8VH&3$,/RZHU6KDOHLQVWDELOLW\
PLWLJDWLRQGULOOLQJEHVWSUDFWLFHV
%DULWH6DJ+LJK8VHZHLJKWHGNLOOZHLJKWEULQHIRUWULSSLQJ
RSHUDWLRQV
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 18 of 21 Printed: 29-Dec-21
6ZDEELQJRQ7ULSV 0HGLXP
5HGXFHWULSVSHHGVXVHZHLJKWHGNLOOZHLJKWEULQH
WRUHGXFHVZDESUHVVXUHPRQLWRUWULSWDQNV XVH
03'LISRVVLEOH
:HOO3UR[LPLW\5LVNV
&'ZLOOEHWKHVHYHQW\VHYHQWKWKZHOOGULOOHGRQWKHSDG'LUHFWLRQDOGULOOLQJFROOLVLRQDYRLGDQFH
LQIRUPDWLRQDVUHTXLUHGE\$&&ELVSURYLGHGLQWKHIROORZLQJDWWDFKPHQWV
'ULOOLQJ$UHD5LVNV
4DQQLN .XSDUXN&5HVHUYRLU3UHVVXUH2IIVHWLQMHFWLRQKDVWKHSRWHQWLDOWRLQFUHDVHWKHUHVHUYRLU
SUHVVXUH+HLJKWHQHGDZDUHQHVVDQGJRRGZHOOFRQWUROSUDFWLFHVZLOOEHXVHGWRSUHYHQWDZHOOFRQWURO
VFHQDULR,IDZHOOFRQWUROVFHQDULRLVHQFRXQWHUHGZHOOFRQWUROGULOOVZLOOEHXVHGWRUHGXFHVKXWLQWLPHV
DQGHQRXJKNLOOZHLJKWPDWHULDOZLOOEHRQORFDWLRQWRNLOOWKHZHOODVUHTXLUHG
:HDN2YHUEXUGHQ6DQG6WULQJHUV±&OHDQVDQGVWULQJHUVIURPVORSHGHSRVLWVZHUHLQWHUPLWWHQWO\
GHSRVLWHGRQWKHVORSHVKHOYHVRIWKH7RURNDQG$OELDQ7KHVHFOHDQVDQGVKDYHUHGXFHGIUDFWXUH
JUDGLHQWVUHODWLYHWRWKHVLOWVDQGFOD\VWKDWPDNHXSPRVWRIWKHRYHUEXUGHQ/&0PDWHULDOZLOOEH
DYDLODEOHWRPLWLJDWHORVVHVLQWKHLQWHUPHGLDWHVHFWLRQV
/RZHU6KDOH6WDELOLW\7KH+5=DQG.DOXELNLQWKH,QWHUPHGLDWHKROHVHFWLRQZLOOUHTXLUHKLJKHUPXG
ZHLJKWVWKDQKLVWRULFDOO\XVHGWRHQKDQFHZHOOERUHVWDELOLW\0DQDJHG3UHVVXUH'ULOOLQJZLOOEHXVHGLQ
FRQMXQFWLRQZLWKDVWULQJFDVLQJGHVLJQWRPLWLJDWH+5= .DOXELNVKDOHLQVWDELOLW\/&0PDWHULDODQG
ZHOOERUHVWUHQJWKHQLQJSLOOVDUHH[SHFWHGWREHHIIHFWLYHLQGHDOLQJZLWKORVWFLUFXODWLRQDVUHTXLUHGWR
PDLQWDLQVXIILFLHQWRYHUEDODQFHIRUZHOOERUHLQVWDELOLW\PLWLJDWLRQ
)RUDOOVHFWLRQVJRRGWULSSLQJSUDFWLFHVZLOOEHVWUHVVHGWRPLQLPL]HWKHSRWHQWLDORIWDNLQJVZDEEHGNLFNV
S
JUDGLHQWVU
SS \
FOHDQVDQGVKDYHUHGXFHGIUDFWXUH
TJ
0DQDJHG3UHVVXUH'ULOOLQJZLOOEHXVHGLQJ\ \J
FRQMXQFWLRQZLWKDVWULQJFDVLQJGHVLJQWRPLWLJDWH+5= .DOXELNVKDOHLQVWDELOLW\
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'6DYHG'HF CRU CD2-361 AOGCC APD Page 19 of 21 Printed: 29-Dec-21 $WWDFKPHQW±&RPSOHWLRQ6FKHPDWLF
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 20 of 21 Printed: 29-Dec-21
$WWDFKPHQW±3URSHUW\3ODW
$2*&&$SSOLFDWLRQIRU3HUPLWWR'ULOO:HOO&58&'
6DYHG'HF
CRU CD2-361 AOGCC APD
Page 21 of 21 Printed: 29-Dec-21
$WWDFKPHQW±'LUHFWLRQDO3ODQ&'
&'ZS
2EMHFWLYH3ODQQHGILQDOZHOOSDWKIRU)LRUG:HVW.XSDUXNSUHSURGXFHGLQMHFWRU&'
&' ZS3ODQ6XPPDU\
'RJOHJ6HYHULW\
0HDVXUHG'HSWK
[[
[
[
[
[
$]LPXWKIURP1RUWK>@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@
&'3%
&'
&'
&'
&'
&'
&'
&'
&'
&'
&' ZS
&' ZS
7UXH9HUWLFDO'HSWK
9HUWLFDO6HFWLRQDW
[
[
[
[
[[
&HQWUHWR&HQWUH6HSDUDWLRQ
0HDVXUHG'HSWK
(TXLYDOHQW0DJQHWLF'LVWDQFH
'',
6859(< 352*5$0
'DWH79DOLGDWHG<HV9HUVLRQ
'HSWK)URP 'HSWK 7R 6XUYH\3ODQ 7RRO
&'ZS&' *<'*&66
&'ZS&' 0:'2:6*
&'ZS&' 0:',)5+'606
&'ZS&' 0:'2:6*
&'ZS&' 0:',)5+'606
&'ZS&' 0:'2:6*
&'ZS&' 0:',)5+'606
&'ZS&' 0:'2:6*
&'ZS&' 0:',)5+'606
&'ZS&' 0:'2:6*
&'ZS&' 0:',)56$*06
&$6,1* '(7$,/6
79' 0' 1DPH
[
[
[
[
[
[
0DJ0RGHO 'DWH %**0 $SU
0DJQHWLF1RUWKLV(DVWRI7UXH1RUWK0DJQHWLF'HFOLQDWLR
0DJ'LS )LHOG6WUHQJWK Q7
6(&7,21 '(7$,/6
6HF 0' ,QF $]L 79' 16 (: 'OHJ 7)DFH 96HFW 7DUJHW $QQRWDWLRQ
6WDUW%XLOG
6WDUW%XLOG
6WDUW%XLOG
6WDUWKROGDW0'
6WDUW%XLOG
6WDUW%XLOG
6WDUW%XLOG
6WDUWKROGDW0'
6WDUW%XLOG
6WDUW%XLOG
6WDUW%XLOG
6WDUW%XLOG
6WDUW%XLOG
6WDUW'/67)2
6WDUWKROGDW0'
6WDUW'/67)2
6WDUWKROGDW0'
6WDUWKROGDW0'
7'DW
)250$7,21723'(7$,/6
79'3DWK )RUPDWLRQ
%DVH)UR]HQ6DQG
%DVH3HUP
&
&
&
&
.
7RS4DQQLN.
%DVH4DQQLN.%DVH
7RS.:HW6DQG
%DVH.:HW6DQG
$OE
$OE
$OE
)6&
+5=
8SSHU.DOXELN
/RZHU.DOXELN.
.XS&
%\VLJQLQJWKLV,DFNQRZOHGJHWKDW,KDYHEHHQLQIRUPHGRIDOOULVNVFKHFNHGWKDWWKHGDWDLVFRUUHFWHQVXUHGLW
VFRPSOHWHQHVVDQGDOOVXUURXQGLQJZHOOVDUHDVVLJQHGWRWKHSURSHUSRVLWLRQDQG,DSSURYHWKHVFDQDQGFROOLVLRQDYRLGDQFHSODQDVVHWRXWLQWKHDXGLWSDFN,DSSURYHLWDVWKHEDVLLV
IRUWKHILQDOZHOOSODQDQGZHOOVLWHGUDZLQJV,DOVRDFNQRZOHGJHWKDWXQOHVVQRWLILHGRWKHUZLVHDOOWDUJHWVKDYHDIHHWODWHUDOWROHUDQFH
3UHSDUHGE\&KHFNHGE\$FFHSWHGE\$SSURYHGE\
3ODQ#XVIW'
7UXH9HUWLFDO'HSWK 9HUWLFDO6HFWLRQDW[[[[[[&'ZS%DVH)UR]HQ6DQG%DVH3HUP&&&&.7RS4DQQLN.%DVH4DQQLN.%DVH7RS.:HW6DQG%DVH.:HW6DQG$OE$OE$OE)6&+5=8SSHU.DOXELN/RZHU.DOXELN..XS&&'ZS'HFHPEHU6HFWLRQ9LHZ
6RXWK1RUWK :HVW(DVW[[[[[[&'ZS&' ZS3ODQ9LHZWhile drilling production section, stay within 100 feet laterally of plan, unless notified otherwise.'HFHPEHU
&'ZS6SLGHU3ORW'HFHPEHU7R1RUWKLQJXVIWLQ(DVWLQJXVIWLQ7HPSWDWLRQ7HPSWDWLRQ$&'&'3%&'3%&'&'3%&'&'/&'&'/&'&'&'3%&'3%&'&'&'/&'3%&'&'3%&'&'&'&'3%&'3%&'&'&'3%&'3%&'&'3%&'&'$&'&'3%&'&'&'&'3%&'&'&'3%&'&'3%&'&'&'3%&'3%&'&'&'3%&'&'&'&'3%&'&'ZSDSSURYHG&'3%&'3%&'&'3%&'&'$&'%&'&'3%&'&'$&'&'3%&'&'&'&'$&'$/&'3%&'&'3%&'&'&'&'3%&'&'3%&'&'&'&'&'/&'/&'/&'/&'&'&'&'&'3%&'&'&'/ZS&'/ZS&'&'$&'$/&'&'&'&'&'3%&'&'&'&'&'/&'&'&'/&'&'&'/&'&'3%&'&'$&'3%&'&'&'3%&'&'&'&'3%&'3%&'&'&'ZSQRUWK&'ZS&'ZS&'ZS&'ZS&'ZS
&HQWUHWR&HQWUH6HSDUDWLRQ
3DUWLDO0HDVXUHG'HSWK &'3%&'&'$&'%&'&'3%&'&'/&'/&'/&'/&'&'ZS&'ZS(TXLYDOHQW0DJQHWLF'LVWDQFH
&' ZS
/DGGHU9LHZ
&HQWUHWR&HQWUH6HSDUDWLRQ
0HDVXUHG'HSWK&'&'/&'&'3%&'&'3%&'&'&'&'3%&'&'3%&'&'$&'%&'&'&'3%&'&'3%&'&'3%&'&'&'/&'/&'/&'/&'&'&'&'&'3%&'&'&'/ZS&'/ZS&'&'$&'$/&'&'&'&'&'3%&'&'/&'&'&'/&'&'3%&'&'&'3%&'ZS&'ZS&'ZS&'ZS(TXLYDOHQW0DJQHWLF'LVWDQFH
6859(<352*5$0
'HSWK )URP 'HSWK 7R 6XUYH\3ODQ 7RRO
&'ZS&' *<'*&66
&'ZS&' 0:'2:6*
&'ZS&' 0:',)5+'606
&'ZS&' 0:'2:6*
&'ZS&' 0:',)5+'606
&'ZS&' 0:'2:6*
&'ZS&' 0:',)5+'606
&'ZS&' 0:'2:6*
&'ZS&' 0:',)5+'606
&'ZS&' 0:'2:6*
&'ZS&' 0:',)56$*06
'HFHPEHU
&$6,1*'(7$,/6
79' 0' 1DPH
[
[
[
[
[
[
&' ZS
7&9LHZ
$]LPXWKIURP1RUWK>@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@
&'
&'3%
&'
&'
&'3%
&'
&'$
&'%
&'
&'3%
&'
&'3%
&'
&'3%
&'
&'/
&'/
&'/
&'/
&'
&'
&'
&'
&'3%
&'
&'
&'/ ZS
&'/ ZS
&'
&'$
&'$/
&'
&'
&'/
&'
&'3%
&' ZS
&'ZS
6859(< 352*5$0
'DWH79DOLGDWHG<HV9HUVLRQ
)URP 7R 7RRO
*<'*&66
0:'2:6*
0:',)5+'606
0:'2:6*
0:',)5+'606
0:'2:6*
0:',)5+'606
0:'2:6*
0:',)5+'606
0:'2:6*
0:',)56$*06
&$6,1* '(7$,/6
79'0'1DPH
[
[
[
[
[
[
6(&7,21 '(7$,/6
6HF 0' ,QF $]L 79' 16 (: 'OHJ 7)DFH 96HFW 7DUJHW $QQRWDWLRQ
6WDUW%XLOG
6WDUW%XLOG
6WDUW%XLOG
6WDUWKROGDW0'
6WDUW%XLOG
6WDUW%XLOG
6WDUW%XLOG
6WDUWKROGDW0'
6WDUW%XLOG
6WDUW%XLOG
6WDUW%XLOG
6WDUW%XLOG
6WDUW%XLOG
6WDUW'/67)2
6WDUWKROGDW0'
6WDUW'/67)2
6WDUWKROGDW0'
6WDUWKROGDW0'
7'DW
ϮͲϯϲϭǁƉϭϯ͘ϭ&ůŝƉŬ6859(<352*5$0'HSWK)URP 'HSWK 7R 7RRO *<'*&66 0:' 2:6* 0:',)5+'606 0:' 2:6* 0:',)5+'606 0:'2:6* 0:',)5+'606 0:' 2:6* 0:',)5+'606 0:' 2:6* 0:',)56$*06&$6,1* '(7$,/679'0'1DPH [ [ [ [ [ [$]LPXWKIURP1RUWK>@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@&'3%&'&'/&'/&'/&'/&'&'&'&'&'3%&'&'&'/&' ZS&'ZS )URP&RORXU7R0'ϱϰ͘ϱϬdŽϭϬϬϬ͘ϬϬ0' $]L 7)DFH
ϮͲϯϲϭǁƉϭϯ͘ϭ&ůŝƉŬ6859(<352*5$0'HSWK)URP 'HSWK 7R 7RRO *<'*&66 0:' 2:6* 0:',)5+'606 0:' 2:6* 0:',)5+'606 0:'2:6* 0:',)5+'606 0:' 2:6* 0:',)5+'606 0:' 2:6* 0:',)56$*06&$6,1* '(7$,/679'0'1DPH [ [ [ [ [ [$]LPXWKIURP1RUWK>@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@&'3%&'&'&'3%&'&'$&'%&'&'3%&'&'3%&'&'/&'/&'/&'/&'&'&'/&' ZS&' ZS )URP&RORXU7R0'ϭϬϬϬ͘ϬϬdŽϮϱϬϬ͘ϬϬ0' $]L 7)DFH
ϮͲϯϲϭǁƉϭϯ͘ϭ&ůŝƉŬ6859(<352*5$0'HSWK)URP 'HSWK 7R 7RRO *<'*&66 0:' 2:6* 0:',)5+'606 0:' 2:6* 0:',)5+'606 0:'2:6* 0:',)5+'606 0:' 2:6* 0:',)5+'606 0:' 2:6* 0:',)56$*06&$6,1* '(7$,/679'0'1DPH [ [ [ [ [ [$]LPXWKIURP1RUWK>@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@&'&'3% )URP&RORXU7R0'ϮϰϬϬ͘ϬϬdŽϲϲϬϬ͘ϬϬ0' $]L 7)DFH
ϮͲϯϲϭǁƉϭϯ͘ϭ&ůŝƉŬ6859(<352*5$0'HSWK)URP 'HSWK 7R 7RRO *<'*&66 0:' 2:6* 0:',)5+'606 0:' 2:6* 0:',)5+'606 0:'2:6* 0:',)5+'606 0:' 2:6* 0:',)5+'606 0:' 2:6* 0:',)56$*06&$6,1* '(7$,/679'0'1DPH [ [ [ [ [ [$]LPXWKIURP1RUWK>@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@&'3% )URP&RORXU7R0'ϲϱϬϬ͘ϬϬdŽϭϰϮϬϬ͘ϬϬ0' $]L 7)DFH
ϮͲϯϲϭǁƉϭϯ͘ϭ&ůŝƉŬ6859(<352*5$0'HSWK)URP 'HSWK 7R 7RRO *<'*&66 0:' 2:6* 0:',)5+'606 0:' 2:6* 0:',)5+'606 0:'2:6* 0:',)5+'606 0:' 2:6* 0:',)5+'606 0:' 2:6* 0:',)56$*06&$6,1* '(7$,/679'0'1DPH [ [ [ [ [ [$]LPXWKIURP1RUWK>@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@ )URP&RORXU7R0'ϭϰϭϬϬ͘ϬϬdŽϮϱϬϬϬ͘ϬϬ0' $]L 7)DFH
ϮͲϯϲϭǁƉϭϯ͘ϭ&ůŝƉŬ6859(<352*5$0'HSWK)URP 'HSWK 7R 7RRO *<'*&66 0:' 2:6* 0:',)5+'606 0:' 2:6* 0:',)5+'606 0:'2:6* 0:',)5+'606 0:' 2:6* 0:',)5+'606 0:' 2:6* 0:',)56$*06&$6,1* '(7$,/679'0'1DPH [ [ [ [ [ [$]LPXWKIURP1RUWK>@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@ )URP&RORXU7R0'ϮϰϬϬϬ͘ϬϬdŽϯϯϰϬϬ͘ϬϬ0' $]L 7)DFH
&'ZS6SLGHU3ORW'HFHPEHU7R1RUWKLQJXVIWLQ(DVWLQJXVIWLQ7HPSWDWLRQ7HPSWDWLRQ$&'&'3%&'3%&'&'3%&'&'/&'&'/&'&'&'3%&'3%&'&'&'/&'3%&'&'3%&'&'&'&'3%&'3%&'&'&'3%&'3%&'&'3%&'&'$&'&'3%&'&'&'&'3%&'&'&'3%&'&'3%&'&'&'3%&'3%&'&'&'3%&'&'&'&'3%&'&'ZS&'3%&'3%&'&'3%
&'&'$&'%&'&'3%&'&'$&'&'3%&'&'&'&'$&'$/&'3%&'&'3%&'&'&'
&'3%&'&'3%&'&'&'&'&'/&'/&'/&'/&'&'&'&'&'3%&'&'&'/ZS&'/ZS&'&'$&'$/&'&'&'&'&'3%&'&'&'&'&'/&'&'&'/&'&'&'/&'&'3%&'&'$&'3%&'&'&'3%&'&'&'&'3%&'3%&'
&'&'ZSQRUWK&'ZS&'ZS&'ZS&'ZS&'ZS
&'ZS6SLGHU3ORW'HFHPEHU7R1RUWKLQJXVIWLQ(DVWLQJXVIWLQ&'&'3%&'3%&'&'3%&'&'/&'&'/&'&'&'3%&'3%&'&'&'/&'3%&'&'3%&'&'&'&'3%&'3%&'&'&'3%&'3%&'&'3%&'&'$&'&'3%&'&'&'&'3%&'&'&'3%&'&'3%&'&'&'3%&'3%&'&'&'3%&'&'&'&'3%&'&'ZS&'3%&'3%&'
&'3%&'&'$&'%&'&'3%&'&'$&'&'3%&'&'&'&'$&'$/&'3%&'&'3%&'&'&'&'3%&'&'3%&'&'&'&'&'/&'/&'/&'/&'&'&'&'&'3%&'&'&'/ZS&'/ZS&'&'$&'$/&'&'&'&'&'3%&'&'&'&'&'/&'&'&'/&'&'&'/&'&'3%&'&'$&'3%&'&'&'3%&'&'&'&'3%&'3%&'&'&'ZSQRUWK&'ZS&'ZS&'ZS&'ZS&'ZS
&'ZS6SLGHU3ORW'HFHPEHU7R1RUWKLQJXVIWLQ(DVWLQJXVIWLQ&'&'3%&'3%&'&'3%&'&'/&'&'/&'&'&'3%&'3%&'&'&'/&'3%&'&'3%&'&'&'&'3%&'3%&'&'&'3%&'3%
&'&'3%
&'
&'$&'&'3%
&'&'&'&'3%
&'&'&'3%&'&'3%
&'
&'&'3%&'3%&'
&'
&'3%
&'&'&'&'3%&'&'ZS&'3%&'3%
&'
&'3%&'&'$&'%&'&'3%&'&'$&'&'3%&'&'&'&'$&'$/&'3%&'&'3%&'&'&'&'3%&'&'3%&'&'&'&'&'/&'/&'/&'/&'&'&'&'&'3%&'&'&'/ZS&'/ZS&'&'$&'$/&'&'
&'&'&'3%&'&'&'&'&'/&'&'&'/&'&'&'/&'&'3%&'&'$&'3%&'&'&'3%&'&'&'&'3%&'3%&'&'&'ZSQRUWK&'ZS&'ZS&'ZS&'ZS&'ZS
&'ZS6SLGHU3ORW'HFHPEHU7R1RUWKLQJXVIWLQ(DVWLQJXVIWLQ&'&'/&'3%
&'
&'&'
&'&'&'3%&'&'ZS&'3%&'3%
&'
&'3%
&'
&'$
&'%&'&'3%&'&'$&'&'3%
&'&'&'&'$&'$/&'3%
&'
&'3%&'
&'
&'3%
&'
&'3%&'&'
&'
&'
&'/
&'/
&'/
&'/&'&'&'&'&'3%&'
&'
&'/ZS
&'/ZS
&'
&'$
&'$/
&'&'
&'&'&'3%&'&'&'
&'
&'/&'&'&'/&'&'&'/
&'
&'3%&'&'$&'3%&'&'&'3%&'&'&'&'3%&'3%&'
&'&'ZSQRUWK&'ZS&'ZS&'ZS&'ZS
&'ZS7HPSWDWLRQ 7HPSWDWLRQ$&'&'3%&'3%&'&'3%&'&'/&'&'/&'&'&'3%&'3%&'&'&'/&'3%&'&'3%&'&'&'&'3%&'3%&'&'&'3%&'3%&'&'3%&'&'$&'&'3%&'&'&'3%&'&'&'3%&'&'3%&'&'3%&'3%&'&'3%&'&'&'3%&'&'3%&'3%&'&'3%&'%&'&'&'3%&'&'3%&'3%&'&'/&'/&'/&'&'&'&'&'/ ZS&'/ ZS&'3%&'&'/&'&'3%&'&'&'3%&'&'&'&'3%&'3%&'&'ZS&' ZS&' ZS'9LHZ&'ZS'HFHPEHU
&'ZS7HPSWDWLRQ 7HPSWDWLRQ$&'&'3%&'3%&'&'3%&'&'/&'/&'&'&'3%&'3%&'&'&'/&'3%&'&'3%&'&'&'&'3%&'3%&'&'&'3%&'3%&'&'3%&'&'$&'&'3%&'&'&'3%&'&'&'3%&'&'3%&'&'3%&'3%&'&'3%&'&'&'3%&'&'ZSDSSURYHG&'3%&'3%&'&'3%&'%&'3%&'&'&'/&'/&'/&'/&'&'&'&'&'/ ZS&'/ ZS&'3%&'&'/&'&'3%&'&'&'3%&'&'&'&'3%&'3%&'&'ZSQRUWK&'ZS'9LHZ&'ZS'HFHPEHU
&'ZS7HPSWDWLRQ 7HPSWDWLRQ $&'&'&'/&'&'/&'&'3%&'&'3%&'&'3%&'3%&'&'3%&'3%&'ZS&'&' ZS'9LHZ&'ZS'HFHPEHU
&'ZS7HPSWDWLRQ 7HPSWDWLRQ $&'&'3%&'&'/&'&'&'/&'3%&'&'&'&'3%&'3%&'&'&'3%&'&'&'3%&'3%&'&'&'&'&'&'3%&'3%&' ZS'9LHZ&'ZS'HFHPEHU
6RXWK1RUWKXVIWLQ :HVW(DVWXVIWLQ
7H P S W D W L R Q 7HPSWDWLRQ$&'3%&'&'ZSDSSURYHG&'&'ZSQRUWK&'ZS&'ZS[[[&'ZS&'ZS4XDUWHU0LOH9LHZ'HFHPEHU:(//%25(7$5*(7'(7$,/60$3&225',1$7(61DPH 79' 6KDSH&'7+ &LUFOH5DGLXV&'77 &LUFOH5DGLXV
$/3,1(
)$&,/,7<352-(&7'5,//
6,7(&'
&'
W,KE͗ϵϬϳͲϲϳϬͲϰϳϯϵ
W,KE͗ϵϬϳͲϲϳϬͲϰϳϯϵ
NAD 83
NAD 83
1
Guhl, Meredith D (OGC)
From:Wiens, Matt R <Matt.R.Wiens@conocophillips.com>
Sent:Thursday, January 20, 2022 11:46 AM
To:Loepp, Victoria T (OGC); Rixse, Melvin G (OGC)
Cc:Hobbs, Greg S
Subject:CD2-361 Updated kick tolerance
All,
Thanksforthemeetingtoday.Belowisthekicktolerancewiththemudweight=totheporepressuretosimulateaswab
kick.PleasenoteproductionPPwillbehigherthanmudweightduetofracgradientlimitation.
Thanks,
Matt Wiens
DrillingEngineerͲERD
ConocoPhillipsAlaskaATOͲ1788
O:+1Ͳ907Ͳ265Ͳ1101
C:+1Ͳ281Ͳ620Ͳ1222
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
See next page for full table
Revised 2/2015
TRANSMITTAL LETTER CHECKLIST
WELL NAME: ______________________________________
PTD: _____________________________________________
___ Development ___ Service ___ Exploratory ___ Stratigraphic Test ___ Non-Conventional
FIELD: ____________________________ POOL: ______________________________________
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK OPTIONS TEXT FOR APPROVAL LETTER
MULTI
LATERAL
(If last two digits
in API number are
between 60-69)
The permit is for a new wellbore segment of existing well Permit
No. _____________, API No. 50-_______________________.
Production should continue to be reported as a function of the original
API number stated above.
Pilot Hole
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both
well name (_______________________PH) and API number
(50-_____________________) from records, data and logs acquired for
well (name on permit).
Spacing
Exception
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of
a conservation order approving a spacing exception.
(_____________________________) as Operator assumes the liability
of any protest to the spacing exception that may occur.
Dry Ditch Sample
All dry ditch sample sets submitted to the AOGCC must be in no greater
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Non-
Conventional
Well
Please note the following special condition of this permit:
Production or production testing of coal bed methane is not allowed for
well ( ) until after ( )
has designed and implemented a water well testing program to provide
baseline data on water quality and quantity.
(________________________) must contact the AOGCC to obtain
advance approval of such water well testing program.
Well Logging
Requirements
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types
of well logs to be run. In addition to the well logging program proposed
by (_______________________________) in the attached application,
the following well logs are also required for this well:
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this
well.
Alpine OilColville River
CRU CD2-361
221-116
WELL PERMIT CHECKLISTCompanyConocoPhillips Alaska, Inc.Well Name:COLVILLE RIV UNIT CD2-361Initial Class/TypeDEV / PENDGeoArea890Unit50360On/Off ShoreOnProgramDEVField & PoolWell bore segAnnular DisposalPTD#:2211160COLVILLE RIVER, ALPINE OIL - 120100NA1 Permit fee attachedYes Surface location lies in ADL 380075; wellbore passes thru ADL 0025530, ADL0387212, and ADL0387211;2 Lease number appropriateYes top of the productive interval lies in ADL 0388906; productive portion of well passes thru AA 0084140,3 Unique well name and numberYes ADL0388904, and ADL0380093; and the bottom-hole location lies in ADL0390344.4 Well located in a defined poolYes COLVILLE RIVER, ALPINE OIL - 120100, governed by CO 443D.5 Well located proper distance from drilling unit boundaryYes CO No. 443D has no interwell spacing restrictions. Wellbore will be more than 500'6 Well located proper distance from other wellsYes from an external property line where ownership or landownership changes.7 Sufficient acreage available in drilling unitYes As planned, well will conform to spacing requirements.8 If deviated, is wellbore plat includedYes9 Operator only affected partyYes10 Operator has appropriate bond in forceYes11 Permit can be issued without conservation orderYes12 Permit can be issued without administrative approvalYes13 Can permit be approved before 15-day waitNA14 Well located within area and strata authorized by Injection Order # (put IO# in comments) (For sNA15 All wells within 1/4 mile area of review identified (For service well only)NA16 Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)Yes 80" conductor provided18 Conductor string providedYes 2316' MD19 Surface casing protects all known USDWsYes 155% excess20 CMT vol adequate to circulate on conductor & surf csgNo21 CMT vol adequate to tie-in long string to surf csgNo uncemented production liner22 CMT will cover all known productive horizonsYes23 Casing designs adequate for C, T, B & permafrostYes Rig has steel tanks24 Adequate tankage or reserve pitNA25 If a re-drill, has a 10-403 for abandonment been approvedYes26 Adequate wellbore separation proposedYes diverter line variance requested and approved27 If diverter required, does it meet regulationsYes Max reservoir pressure 4305 psig(11.5 ppg EMW); will drill w/ 9.5-12.2 ppg EMW; MPD used28 Drilling fluid program schematic & equip list adequateYes29 BOPEs, do they meet regulationYes MPSP is 3579 psig; will test BOPs to 4000 psig30 BOPE press rating appropriate; test to (put psig in comments)Yes31 Choke manifold complies w/API RP-53 (May 84)Yes32 Work will occur without operation shutdownNo H2S measures rqd33 Is presence of H2S gas probableNA34 Mechanical condition of wells within AOR verified (For service well only)Yes H2S not encountered in offset wells. However, rig will be equipped with operational sensors/alarms.35 Permit can be issued w/o hydrogen sulfide measuresYes Maximum expected reservoir pressure is about 11.5 ppg EMW; will be drilled with 9.5 to 12.2 ppg36 Data presented on potential overpressure zonesNA mud using Managed Pressure Drilling technique to maintain borehole stability in shale sections37 Seismic analysis of shallow gas zonesNA and manage reservoir pressure. Some potential to encounter lost circulation. Adequate mud and38 Seabed condition survey (if off-shore)NA LCM supplies will be available on site. Drilling hazards and mitigation discussed on p. 15-18.39 Contact name/phone for weekly progress reports [exploratory only]ApprSFDDate12/29/2021ApprVTLDate1/20/2022ApprSFDDate12/29/2021AdministrationEngineeringGeologyGeologic Commissioner:Date:Engineering Commissioner:DatePublic CommissionerDate-03JLC 1/20/2022