Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
183-131
TT RR AA NN SS MM II TT TT AA LL FROM::Sandra D. Lemke, ATO-704 TO:: Meredith Guhl ConocoPhillips Alaska, Inc. AOGCC P.O. Box 100360 330 W. 7 th Ave., Suite 100 Anchorage AK 99510-0360 Anchorage, Alaska 99501 RE: Schlumberger Wireline Backlog – Kuparuk River Unit DATE: 12/19/2023 Transmitted: North Slope, Kuparuk River Unit Via hard drive data drop _1E-17 50-029-20793-00 182116_1E-17_IPROF_16Jan2023 _1E-20 50-029-20895-00 183005_1E-20_LDL_10Jan2023 183005_1E- 20_PlugSettingRecord_20Aug2023 183005_1E-20_PPROF_29Sep2022 183008_1E-20_RBP_25Feb2023 1F-06 50-029-20820-00 182145_1F-06_Perf_11Jul2022 182145_1F-06_TubingCut_20Feb2022 1G-09 50-029-21001-00 183124_1G-09_IPROF_01Jun2022 1G-103 50-029-20824-00 219110_1G-103_RSTWFL_09Nov2022 1G-11 50-029-21008-00 183131_1G-11_LDL_31May2022 1G-13 50-029-21016-00 183140_1G-13_LDL_09Jul2022 1H-102 50-029-23580-00 217097_1H-102_PPROF_02May2022 1H-103 50-029-23593-00 218003_1H-103_PPROF_06May2022 1H-109 50-029-23595-00 218013_1H-119_IPROF_02JUL2023 3of 12 Transmittall instructions: please promptly sign, scan, and e-mail to Sandra.D.Lemke@conocophillips.com Receipt: Date: Alaska/IT-Support Services GGRE |ConocoPhillips Alaska |Office: 907.265.6947; Mobile 907.440.4512 T38329 T38330 T38331 T38332 T38333 T38334 T38335 T38336 T38337 T38338 2/29/2024 1G-11 50-029-21008-00 183131_1G-11_LDL_31May2022 Kayla Junke Digitally signed by Kayla Junke Date: 2024.02.29 11:29:27 -09'00' • • 2-G)Cr,2� JAW 07 -2b', Memory Multi-Finger Caliper Log Results Summary Company: ConocoPhilips Alaska, Inc. Well: 1G-11 Log Date: December 31, 2015 Field: Kuparuk Log No.: 14753 State: Alaska Run No.: 2 API No. 50-029-21008-00 Pipe Description: 3.5 inch 9.3 lb. J-55 EUE 8RD Top Log Interval: 6,844 Ft. (MD) Pipe Use: Tubing Bottom Log Interval: 7,621 Ft. (MD) Pipe Description: 2.375 inch 9.3 lb. Top Log Interval: 7,621 Ft. (MD) Pipe Use: Liner Bottom Log Interval: 7,733 Ft. (MD) Inspection Type : Liner Top Packer Inspection COMMENTS : This caliper data is tied into GLM 9 at 7,488 feet(Driller's Depth). Two passes were made over the intended log interval(both passes at 50fpm). This report represents data from both passes. This log was run to assess the location and condition of the Liner Top Packer. The caliper recordings indicate the liner top packer appears to be fully stabbed into the deployment sleeve. A 3-D log plot comparison of the pass 1 and pass 2 caliper recordings across the Liner Top Packer is included in this report. This is the second time a PDS caliper has been run in this well, the second time the 3.5 inch tubing has been logged and the first time the 2.375 inch liner has been logged. Due to the purpose of this log and the short interval logged no comparison graph is included in this report. A visual inspection of the 3.5 inch tubing indicates no significant corrosive or mechanical damage throughout the tubing logged. SCANNED JUL 2 5 2016 T. Leckband C. Duff S. Ferguson y .(s) ProActive Diagnostic Services, Inc. / P.O. Box 1369, Stafford,TX 77497 Phone: (281)431-7100 or(888) 565-9085 Fax: (281)431-7125 E-mail: PDSAnalysismemorylog.com Prudhoe Bay Field Office Phone: (907) 659-2307 Fax: (907) 659-2314 IIII\ 0 0 PDS Multifinger Caliper 3D Log Plot Company : ConocoPhilips Alaska, Inc. Field : Kuparuk Well : 1G-11 Date : December 31, 2015 Description : Comparison of Pass 1 and Pass 2 Caliper Recordings Across LTP Logged. Nominal I.D.(Pass 1) 3-D Log(Pass 1) Image Map(Pass 1) Depth IMaximum I.D.(Pass 2) 3-D Log(Pass 2) Image Map(Pass 2) 1.5 inches 3.5 0° 0° 90° 180° 270° 0° lft75ft 1.5 inches 3.5 0° 0° 90° 180° 270° 0° Maximum I.D.(Pass 1) Minimum ID.(Pass 2) I I 1.5 inches 3.5 1.5 inches 3.5 Minimum I.D.(Pass 1) Nominal I.D.(Pass 2) I • • 1.5 inches 3.5 1.5 inches 3.5 1 - I 1111111111 7605 ' _ 1111111 I 11111111 — 77615 610 11 ' ll'i 7620 ..._ . ... , . • - 3.5" ubing i 3.5" Tubing I'll _ ..,„... ... _ t_ I ..,+' ' ' "._.".'------. - , 1111111 .c., ..• 7625 r ,. . , Liner Top a • . Liner Top •,r Packer ••." Packer - 7630 4, 31111 4111W-. v. Iv ..._ .... ‘,... 4 375" Liner 7635 i t.375" Liner :• ."' ,.. 7.. '..... - - ,• -- . - ;•0' * KUP PROD • IG-11 ConocoPhillps1!Well Attributes Max Angle&MD TD Alaska.IFC i Wellbore APl/UWI Field Name Wellbore Status Mel(°) MD MB) Act abn(RKB( ,,,,,...4411, l' KUPARUK RIVER UNIT PROD 41.68 4,900.00 8,208.0 ••• Comment HOS(ppm) Date Annotation End Date KB4rd(R) Rig Release Date 15-11,10/12/2015 2;06'.35 PM SSSV:NONE 100 1 2/1 6/2 01 3 Last WO: 3/15/2015 40.99 9/19/1983 Verl09l schematic(actual) Annotation Depth(MOM End Date Annotation Last Mod By End Date --••-•-------•-- •----- ---------- Last Tag:SLM 7,946.0 6/10/2014 Rev Reason:GLV C/O pproven 10/12/2015 HANGER;31.2 11E_4 --— Casing Strings f Casing Description OD(In) ID(in) Top(MB) Set Depth(RKB) Set Depth(TVD)...Wt/Len II...Grade Top Thread 1;I WINDOW 7 7,658.0 7.668.0 6,461.8 Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) 800/ Top(TVD( Top Mel 1 Top(RKB) (RKB) (°) Des Com Run Date ID(In) 7,614.0 6,416.9 33.54 TUBING PERFORATE TUBING 7814'-7619'WITH 2",3SPF, 7292015 2.992 �.. t n_e,.,,-. PUNCH 120 DEG PHASING GUNS LOADED WITH 6.7 CONDUCTOR;38.0-106 0"- GRAM BIG HOLE CHARGES. 7,860.0 6,455.2 33.76 WHIPSTOCK TOP OF BAKER HUGHES WHIPSTOCK 3 DEG 8/42015 ROHS @ 7680'.LOG CORRELATED TO ATLAS €. CBL DATED 10/4/83. SURFACE;37.1-2,35t3-o 7,700.0 6,488.4 33.95 CEMENT RETAINER 2.75"X1.47' 7/12/2015 RETAINER GAS LIFT',2,726.2 ' 7,831.0 6.597.6 33.15 PLUG CA-2 PLUG w 128 of SAND 4/23/2015 Perforations&Slots Shot • Dens GAS LIFT,4,148.1 Top(TVD) Btm(TVD) (shots/t Top(MB) Btm MB) (RKB) (RKB) Zone Date 1) Type Com 7,540.0 7,590.0 6,355.2 6,396.9 C-4,1G-11 12/23/1983 12.0 IPERF 120 deg Phasing;5" 9----- Dresser Atlas GAS LIFT;5,320.5 3 7,876.0 7,722.0 6,488.5 6,508.7 C-1,IG-11 1223/1983 12.0 IPERF 120 deg Phasing;5" Dresser Atlas -- 7,710.0 7,720.0 8,496.7 6,505.0 A-4,1G-11 7/6/2015 3.0 APERF 120 DEG PHASING,2' ---- HSC HES millenium big hole charges GAS LIFT;6,185.34 7,945.0 7,950.0 6,693.5 6,697.7 A-5,1G-11 3/30/1984 4.0 APERF 90 deg Phasing;RigidJet 7,960.0 7,980.0 6,706.2 6,723.2 A-4,1G-11 11/26/1993 4.0 APERF 180 deg.Phasing;183 GAS LIFT;6,8324 CCW orientation;2 5/8" Titan HC 7.980.0 7,982.0 6.723.2 6,724.9 A-4,1G-11 3/30/1984 4.0 APERF 90 deg Phasing:RigidJet GAS LIFT;7.171 4 Cement Squeezes Top(TVD) Btm(TVD) Top(RKB) Btm(MB) (RKB) (RKB) Des Start Date Com 7.620.0 7,813.0 8,421.9 6,582.5 CEMENT PLUG 7/12/2015 Pump 35 bbls of 15.8 ppg cement 7,493.0 7,620.0 8,316.1 8,421.9 CEMENT PLUG 7/31/2015 Pump 35 bbls of 15.8 ppg cement with middle 25 bbls LOCATOR;7,2275 containing 1.5 ppb of Cern Net fiber. SEAL ASSY;7,228.5 p08.7,235.8 I Notes:General&Safety PACKER;7258.3 End Date Annotation I' ` 1/20/2004 NOTE:WAIVERED WELL:IA x OA COMMUNICATION F 9/16/2010 NOTE:View Schematic w/Alaska Schematic9.0 NIPPLE;7,311.1 OVERSHOT;7,3598S SBR;7,376.2 PACKER,74023 PRODUCTION;7,437.7 L� � ■ I PRODUCTION,7,504.8 a: IPERF;7.540.0-7,590.0 a': ■ TUBING PUNCH;7.614.0 11 2 ■ C S ALINER;7,625B-10,0300N It PRODUCTION;37.1-8,187.7` WH IPSTOCK•7,660.0, WINDOW;7,8580-7,8680 ti IPERF;7,676.0-7,722.0L. CEMENT RETAINER;7,700.0 APERF;7,710.0-7,720.0 ' SOY��"r PLUG;7,831.0-----® APERF;7.945.0-7.950.0-- APERF 7,860.0-7,980.0 -- APERF,7,980.0-7,982.0 tg 3- X31 • • 24 GI,21 WELL LOG TRANSMITTAL SAL �, W f, �� JAAI D7-2016 DATA LOGGED PROACTIVE DIAGNOSTIC SERVICES, INC. •/2-V20140 K.BENDER To: AOGCC Makana Bender 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper/MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage,AK 99518 SWIM Fax: (907) 245-8952 1) Caliper Report 31-Dec-15 1G-11 1 Report /CD 50-029-21008-00 2) Signed : � J 'a't �v .-e1 Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 Fax: (907)245-8952 E-MAIL: PDSANCHORAGE(l)MEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D:\Achives\MasterTemplateFiles\Templates\Distribution\TransmittalSheets\ConocoPhillips_Transmit.docx • STATE OF ALASKA • RECEIVED SFP 2 8 2015 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOGOC la.Well Status: Oil ❑ Gas❑ SPLUG ❑ Other El Abandoned � Suspended❑ lb.Well Class: 20AAc 25.105 20AAc 25.110 Development ❑✓ i Exploratory El GINJ ❑ WINJ ❑ WAGE] WDSPL❑ No.of Completions: Service ❑ Stratigraphic Test El 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number/ Sundry: ConocoPhillips Alaska, Inc. Aband.: 8/19/2015 , • 183-131 /315-325 , 3.Address: 7. Date Spudded: 15.API Number: P. O. Box 100360,Anchorage,AK 99501 9/7/1983 50-029-21008-00 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16.Well Name and Number: Surface: 327'FSL, 806'FWL, Sec. 29,T12N, R10E, UM 9/15/1983 KRU 1G-11 Top of Productive Interval: 9. KB(ft above MSL): 99' 17. Field/Pool(s): 1517'FNL, 1307'FEL, Sec. 32,T12N, R10E, UM GL(ft above MSL): 63' Kuparuk River Field/Kuparuk River Oil Poo Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 1749'FNL, 1001'FEL, Sec. 32,T12N, R10E, UM • 7359'MD/6200'TVD ADL 25640 4b. Location of Well(State Base Plane Coordinates, NAD 27): 11.Total Depth MD/TVD: 19. Land Use Permit: Surface: x- 540585.5 y- 5980976 Zone- 4 .8208'MD/6918'TVD 2571 TPI: x- 543769 y- 5979150 Zone- 4 12. SSSV Depth MD/TVD: 20.Thickness of Permafrost MD/TVD: Total Depth: x- 544077 y- 5978920 Zone- 4 no SSSV 1652'MD/1624'TVD 5. Directional or Inclination Survey: Yes ❑(attached) No ❑l 13.Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 na (ft MSL) not applicable 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance,dipmeter,formation tester,temperature, cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary none SCANNED JAN 2 0 2016 23. CASING, LINER AND CEMENTING RECORD WT. PER SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD FT PULLED 16" 65# H-40 38' 106' 38' 106' 24" 212 sx CS II 10.75" 45.5# J-55 37' 2351' 37' 2206' 13.5" 930 sx ASIII,250 sx ASI 7" 26# J-55 37' 8188' 37' 6901' 8.5" 610 sx Class G, 250 sx ASI 24. Open to production or injection? Yes ❑ No El 25.TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation SIZE DEPTH SET(MD) PACKER SET(MD/TVD) Size and Number): 3.5" 7366' 7258'MD/6124'TVD, perfs squeezed off 7402'MD/6241'TVD and 7813'MD/6583'TVD 26.ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes❑ No ❑ Per 20 AAC 25.283(i)(2)attach electronic and printed information DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED retainer @ 7700'MD 35 bbls of 15.8 ppg cement plug @ 7831'MD cement squeeze 7493-7813 70 bbls of 15.8 ppg cement 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing,gas lift,etc.): suspended Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period - Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API (corr): Press. 24-Hour Rate - - Form -Form 10-407 Revised 5/2015 U;`77. /0/8//5- CONTINUED ON P GE 2 RBDMSZ1 SP 3 0 2015 Submit ORIGINIAL only ,. • 28. CORE DATA Conventional/Ps): Yes ❑ No E Sidewall Cores: Yes ❑ No ❑ If Yes, list formations and intervals cored(MD/TVD, From/To), and summarize lithology and presence of oil,gas or water(submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑✓ Permafrost-Top surface surface If yes, list intervals and formations tested, briefly summarizing test results. Permafrost-Base 1652' 1624' Attach separate pages to this form, if needed,and submit detailed test information, including reports, per 20 AAC 25.071. Top Upper Sand 7484' 6308' Base Upper Sand Top Lower Sand 7936' 6685' Base Lower Sand Formation at total depth: Kuparuk 31. List of Attachments: Summary of Daily Operations, schematic Information to be attached includes, but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Mike Winfree @ 263-4404 Email: Mike.Winfree(u)cop.com )J c1/144111--- Printed /144 11---Printed Name: Dan Venhaus Title: CTD Engineering Supervisor Signatu��� Phone: 263-4372 Date: INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item la: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b: Well Class-Service wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation, or Other. Item 4b: TPI(Top of Producing Interval). Item 9: The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion,suspension, or abandonment,whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift, Rod Pump, Hydraulic Pump, Submersible,Water Injection,Gas Injection,Shut-in, or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions,core chips,photographs, and all subsequent laboratory analytical results, including,but not limited to: porosity, permeability,fluid saturation,fluid composition,fluid fluorescence,vitrinite reflectance,geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey, and other tests as required including, but not limited to:core analysis,paleontological report, production or well test results. Form 10-407 Revised 5/2015 Submit ORIGINAL Only KUP PROD • 1G-11 CC)noco �11� IpS l' Well Attributes Max Angle&MD TD A1askal IncWellbore API/UWI Field Name Wellbore Status Incl(°) MD(ftKB) Act Btm(ftKB) ,�otyNm 500292100800 KUPARUK RIVER UNIT PROD 41.68 4,900.00 8,208.0 ••• Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) 'Rig Release Date 10-11,9/17/20152;53.39 PM SSSV:NONE 100 12/16/2013 Last WO: 3/15/2015 40.99 9/19/1983 Vertical schematic(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date ------cosily 1;o o Last Tag:SLM 7,946.0 6/10/2014 Rev Reason:CEMENT,SET WHIPSTOCK hipshkf 8/6/2015 HANGER;31.2 t ` ' t Casing Strings 1F Casing Description OD 0n) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...WULen(I...Grade Top Thread I a`I CONDUCTOR 16 15.250 38.0 106.0 106.0 65.00 H-40 WELDED ' `. '"'"' `dLO,Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(I...Grade Top Thread 1111.11 SURFACE 103/4 9.950 37.0 2,351.3 2,206.1 45.50 J-55 BTC •n,n7.n n n n n n ,,7, ,7o.Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...WtlLen(I...Grade Top Thread CONDUCTOR;38.0-106.0 PRODUCTION 7 6.276 37.1 8,187.7 6,900.9 26.00 J-55 BUTT Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(I...Grade Top Thread "A"Lateral liner assemly 23/8 1.9921 7,625.8 10,030.0 I 4.60 L-80 ST-L SURFACE;37.1-2,351.3-• 1. • Liner Details 1111. Nominal ID it GAS LIFT;2,726.2 Top(ftKB) Top(TVD)(ftKB) Top Intl(°) Item Des Coin (in) 7,625.8 6,426.7 33.59 SBR(Seal Bore Baker SBR Deployment Sleeve 2.250 ME Receptacle) INA GAS LIFT;4,148.1 7,739.2 6,521.0 33.72 XO Reducing Crossover Pup 2 3/8",4.6 ppf,L-80 X 2 1/6",3.35 ppf, 1.751 11 (Casing) L-80 Hyd511 bxp 7,744.5 6,525.4 33.69 Swell Packer Halliburton 2-1/16"Swellpacker,Water Swell 1.751 GAS LIFT;5,320.5 Medium,(SAP#102508668) 1 7,759.7 6,538.1 33.60 XO Enlarging Crossover Pup 2 1/6",3.25 ppf,L-80 X 2 3/8",4.6 ppf, 1.751 (Casing) L-80,Hyd511 bxp GAS LIFT;8,185.3 8,752.4 Open Hole OPEN HOLE 3.000 8,776.4 Deployment Shorty Deployment Sleeve 1.920 Sleeve I GAS LIFT;8,832.4 Tubing Strings III all Tubing DescriptionI String Ma...I ID(in) I Top(ftKB) I Oct Depth(ft..(Set Depth(TVD)(..I Wt(lb/ft) I Grade I Top Connection TUBING WO 3 1/2 2 992 31 2 7,366 31 6,211.7 9.30 L-80 EUE8rd mod GAS LIFT;],1]1.411 Completion Details I Nominal ID Top(ftKB) Top(TVD)(fIKB) Top Incl(°) Item Des Com (in) �1'' t 31.2 31.2 0.10 HANGER CIW TUBING HANGER 2.992 LOCATOR;7,227.5 SEAL ASSY;7,226.5 _ 7,227.5 6,098.8 35.87 LOCATOR LOCATOR SUB 2.990 PBR;7,235.8 PACKER;7,258.3 -- _ 7,228.5 6,099.6 35.87 SEAL ASSY BAKER 80-40 SEAL ASSEMBLY 2.990 7,235.8 6,105.5 35.85 PBR BAKER 80-40 PBR 4.000 MB IR 7,258.3 6,123.8 35.81 PACKER BAKER FHL RETRIEVALBE PACKER 2.910 NIPPLE;7,311.1 I '- 7,311.1 6,166.7 35.63 NIPPLE CAMCO DS NIPPLE(PULLED RHC AND BALL AND 2.812 Et ROD,4 15 15) PP 7,359.8 6,206.3 35.23 OVERSHOT POOR BOY TUBING OVERSHOT 3.750 OVERSHOT;7,359.8 It Tubing Description I String Ma...I ID(in) 'Top(ftKB) (Set Depth(ft..f Set Depth(TVD)(...I Wt(lb/ft) (Grade (Top Connection Elli TUBING-ORIGINAL 4112 2.992 7,361.311 7,841.21 6,606.2 9.201J-55 FL4S Soft 7,376.2 ficuif Completion Details PACKER;7,402.3 - - - ID Top(ftKB) Top(TVD)(ftKB) Top Incl I°) Item Des Com {Nornoinn)al PRODUCTION;7,437.7 7,376.2 6,219 7 35.10 SBR OTIS SBR(2.81"X NIPPLE PROFILE) 2.813 PRODUCTION;7,504.8 i' i-4I 7,402.3 6,241.2 34.87 PACKER OTIS RRH PACKER 2.970 • - 7,541.7 6,356.6 33.56 BLAST RINGS BLAST RINGS(3) 2.992 IPERF;7,540.0-7,590.0- ' 7,657.2 6,452.9 33.74 BLAST RINGS BLAST RINGS(3) 2.992 TUBING PUNCH;7,614.0 k4ioI i if t-11 jti 7,812.7 6,582.3 33.28 LOCATOR OTIS LOCATOR 2.992 mI; I 7,813.1 6,582.6 33.28 PACKER OTIS WD PACKER 4.000- it) 7,816.5 6,585.4 33.25 MILLOUT OTIS MILL OUT EXTENSION 4.410 01 1'1 7,830.8 6,597.4 33.15 NIPPLE CAMCO D NIPPLE NO GO 2.750 WHIPSTOCK;7,660.0 Of rt 7,840.4 6,605.5 33.09 WLEG OTIS WIRLINE RE-ENTRY GUIDE,ELMD TTL @ 7822 3.015 4111 (PERF;7,676.0-7,722.o-,_ during PPROF on 9/27/2007 CEMENT RETAINER 7,700.0 .-11=10Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) Top(TVD) Top Incl APERF;7,710.0-7,720.0-4 Top(ftKB) (ftKB) () Des t Com Run Date ID(in) • - 7,614.0 6,416.9 33.54 TUBING PERFORATE TUBING 7614'-7619'WITH 2",3SPF, 7/29/2015 2.992 PUNCH 120 DEG PHASING GUNS LOADED WITH 6.7 411 f• lg1 GRAM BIG HOLE CHARGES. 7,660.0 6,455.2 33.76 WHIPSTOCK TOP OF BAKER HUGHES WHIPSTOCK 3 DEG 8/4/2015 VI ROHS @ 7660'.LOG CORRELATED TO ATLAS CBL DATED 10/4/83. fk 7,700.0 6,488.4 33.95 CEMENT RETAINER 2.75"X 1.47' 7/12/2015 PRODUCTION;7,775.2 RETAINER • 7,831.0 6,597.6 33.15 PLUG 'CA-2 PLUG w 12ft of SAND 4/23/2015 LOCATOR;7,812.7 w�� I PACKER;7,813.1 Perforations 8r.Slots MILLOUT;7,816.5 7 . -- Shot ill 1 Dens NIPPLE;7,830.8- /// Top(TVD) Btm(TVD) (shots/f PLUG;7,831.0 jy(ii Top(ftKB) etm(ftKB) (ftKB) (ftKB) Zone Date t) Type Com ]Y741 7,540.0 7,590.0 6,355.2 6,396.9 C-4,1G-11 12/23/1983 12.0 IPERF 120 deg Phasing;5" WLEG;7,840.4 ;) Dresser Atlas _ 7,676.0 7,722.0 6,468.5 6,506.7 C-1,1G-11 12/23/1983 12.0 IPERF 120 deg Phasing;5" - Dresser Atlas APERF;7,945.0-7,950.0- _ 7,710.0 7,720.0 6,496.7 6,505.0 A-4,10-11 7/6/2015 3.0 APERF 120 DEG PHASING,2' APERF;7,960.0-7,980.0-7j HSC HES millenium big APERF;7,980.0-7,982.0- hole charges 1 7,945.0 7,950.0 6,693.5 6,697.7 A-5,10-11 3/30/1984 4.0 APERF 90 deg Phasing;RigidJet PRODUCTION;37.1-8,187.7-r 7,960.0 7,980.0 6,706.2 6,723.2 A-4,10-11 11/26/1993 4.0 APERF 180 deg.Phasing;163 CCW orientation;2 5/8" X. Titan HC 7,980.0 7,982.0 6,723.2 6,724.9 A-4,10-11 3/30/1984 4.0 APERF 90 deg Phasing;RigidJet •A•Lateral liner assemly; 7,625 8-10,030 0 aKUP PROD • 1G-11 ConocoPhillips LI°m/, Alaska,lnc- alx 1G-11,9/1712015 2:53:40 PM Vertical schematic(actual) Caning 1;0.0 HANGER,31.2 , Cement Squeezes Top(TVD) Btm(TVD) 3 I ah)l Top(ftKB) Btm(ftKB) (ftKB) (ftKB) Des Start Date Coin ' •. mta/ 7,620.0 7 813 0 6,421.9 6,582.5 CEMENT PLUG 7/12/2015 Pump 35 bbls of 15.8 ppg cement'�� 7,493.0 7,620.0 6,316.1 6,421.9 CEMENT PLUG 7/31/2015 Pump 35n bbls of 15.8 ppg cement with middle 25 bbls CONDUCTOR,38.0-106.0 Its containing 1.5 ppb of Cern Net fiber. Mandrel Inserts st an SURFACE,37.1-2,351.3—,.- A on Top(TVD) Valve Latch Port Size TRO Run N Top(ftKB) (ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date Corn GAS LIFT;2,726.2 1 2,726.2 2,522.7 CAMCO MMG 11/2 GAS LIFT DMY RK 0.000 0.0 3/23/2015 1 2 4,148.1 3,673.7 CAMCO MMG 11/2 GAS LIFT DMY RK 0.000 0.0 3/23/2015 3 5,320.5 4,582.8 CAMCO MMG 11/2 GAS LIFT DMY RK 0.000 0.0 3/23/2015 GAS LIFT,4,148.1 4 6,185.3 5,260.1 CAMCO MMG 11/2 GAS LIFT DMY RK 0.000 0.0 4/15/2015 5 6,832.4 5,780.0 CAMCO MMG 1 1/2 GAS LIFT DMY RK 0.000 0.0 3/23/2015 6 7,171.4 6,053.4 CAMCO MMG 11/2 GAS LIFT DMY RK 0.000 0.0 3/23/2015 GAS LIFT;5,320.5 7 7,437.7 6,270.2 OTIS SPM 1 PROD DMY BK 0.000 0.0 6/21/2015 8 7,504.8 6,325.9 OTIS SPM 1 PROD DMY BK 0.000 0 0 6/22/2015 9 7,775.2 6,551.0 OTIS SPM 1 PROD OPEN BEK 0.000 0 0 4/23/2015 GAS LIFT;6,185.3 Notes:General&Safety End Date Annotation 1/20/2004 NOTE:WAIVERED WELL IA x OA COMMUNICATION GAS LIFT;6,832.4 _ 9/16/2010 NOTE:View Schematic w/Alaska Schematic9.0 II: GAS LIFT;7,171.4 II .: LOCATOR;7,227.5 I I. SEAL ASSY;7,228.5 r� PBR;7,235.8 PACKER;7,258.3 _ I NIPPLE;7,311.1r 1.1 II OVERSHOT;7,359.8 Si si SBR;7,376.2 PACKER,7,402.3 __ PRODUCTION;7,437.7L II ,: PRODUCTION;7,504.8 IPERF;7,540.0-7,590.0— ,`.___ TUBING PUNCH;7,614.0 y --LI 5 0 011 II WHIPSTOCK 7,660.0 ' IPERF;7,676.0-7,722.0. 011,4 — CEMENT RETAINER,7,700.0 1-14 APERF;7,710.0-7,720.0— 5 11 ri yl Oil PRODUCTION;7,775.2 . LOCATOR;7,812.7-. PACKER;7,813.1 • _Ft- r: Ili NIPPLE;7,831.0— PLUG;7,831.0 ir WLEG;7,840.4 APERF;7,945.0-7,950.0— APERF;7,960.0-7,980.0—_ APERF;7,980.0-7,982.0 PRODUCTION;37.1-8,187.7- I n VV.Lateral liner assemly; 7,625.8-10,030.0' • 0 2 Zo U, F-- it 0 r a O. C7 0 2 — a) b r a ra o O it i$ c d N 0 a) E E �E2 Ti w 2b C w N 3 a E m o Ill N Y cG C c-1 N C is, m 11 N i0 ct o 2 g 2 ^ 0 iII �o� N v E b m M L.inm Cn B V E• N I I b N I� E W N O n 111 Q N W i O 2 2 m 0 n E 0 io III n r -, 2 0 2n m E v c aio 2a I al N- - h = 5r ire - U) Esn aU o WJ ^ iN V- d 0 d 7 U . n ( d 3 It .c 0 c E o` a .o v o c t ,,,E-7, .� m I 3 I E - o a col. $ " o fl- ,a w , co- , E N- E 0 N- N = . (O RI O O ib U0 [o v r v 0 a) 0 ami N o io aE b o 0 0 co—PN f N '? N CO m L fel U U) N I c, N • (I) N i N r- U F- a1 N- 1:1_ a Iiii 1 // O • E" `5.4E n...4E (13 on71 0' .2 F- 0 I U . 0 u m in 0 N ( 2 a) a 00 N 00 �� m _ U) all 8H 'N o a, 0 I tr Ni 0 y r"..0-3 0 m `off m U m E o ¢°�' v N °L.' n om Nvg UUU a 0 d o E _m E' Eo m mN 2 E 0 d U c co d �2 ° .9, m IL b 0 O c $ c I Y Q r =3 LL jok 1G-11 WELL WORK SUMAMRY IIP DATE SUMMARY PRE-RIG WELL WORK 4/15/2015 GAUGED TBG TO 2.72"TO 7250' SLM; SET BAITED P/T ON BALL n' ROD @ 7311' RKB. REPLACED SOV© 6185' RKB WITH DV. TESTED TBG 2500 PSI, GOOD. PULLED BAITED P/T AND BALL n' ROD; PULLED RHC. DRIFTED TO 7900' RKB WITH 2-5/8" DUMMY WHIPSTOCK. IN PROGRESS. 4/16/2015 DRIFTED WITH 2.75" CA-2 DUMMY PLUG TO 7831' RKB. SET 2.75" CA-2 PLUG AND DUAL SPARTEK GAUGES @ SAME. RETURN IN 5 DAYS FOR C-SAND BHP. 4/22/2015 MEASURED C SAND BHP @ 7635' RKB: 2796 PSI. PULLED 2.75" CA-2 PLUG w/ GAUGES. FINAL A SAND BHP: 2699 PSI. IN PROGRESS. 4/23/2015 BRUSH TBG TO 2.75" D NIPPLE @ 7831' RKB. SET 2.75" CA-2 PLUG @ 7831' RKB. SET CATCHER @ 7795' SLM. PULLED CVs @ 7775', 7505', 7438', RKB, SET DV @ 7505' RKB. PULLED CATCHER. IN PROGRESS. 4/24/2015 DUMP BAILED 12' SAND ON CA-2 PLUG @ 7831' RKB. COMPLETE. 6/20/2015 SET CATCHER ON SAND © 7793' SLM. MAKE MULTIPLE ATTEMPTS TO SET 1" DV @ 7438' RKB. BRUSH N' FLUSH MANDREL © SAME. IN PROGRESS 6/21/2015 SET 1" DV @ 7438' RKB. RAN D&D HOLE FINDER, FOUND LEAK TO BE AT STA. 8 @ 7505' RKB. PULLED 1" DV @ 7505' RKB. IN PROGRESS 6/22/2015 SET 1" DV© 7505' RKB. RAN LEAK DETECT DETERMINED LEAK IN STA. 8 © SAME. PULLED AVA CATCHER @ 7793' SLM. JOB COMPLETE 7/5/2015 RE-ENERGIZE OC PO (COMPLETE) 7/6/2015 PERFORATE ZONE 7710'TO 7720'. LOG CORRELATED TO DRESSER ATLAS CEMENT BOND LOG DATED 4-OCT-1983. CCL STOP DEPTH AT 7702.4'. CCL TO TOP SHOT 7.4'. READY FOR COIL. POST PERF INJECTIVITY TEST; .75 BPM 500 PSI 1.0 BPM 525 PSI 1.25 BPM 525 PSI. 7/8/2015 OC POT (PASS) OC PPPOT (PASS) 7/11/2015 WEEKLY BOP TEST, RIH LOG FROM 7750' CTMD UP TO 7700' PAINT FLAG, CONTINUE LOGGING UP TO 7100'. POOH, ****JOB IN PROGRESS**** 7/12/2015 RIH TO FLAG, CORRECT TO 7723.71' MID ELEMENT. PICK UP TO 7700', DROP .5" BALL, SET RETAINER. PUMP 35BBLS 15.8 PPG CEMENT. FINAL CTP WAS 1638, WHP 590, IA 0, OA 0, FREEZE PROTECT WELL TO 2000' ***WAIT 24HRS BEFORE SLICKLINE DRIFT***** 7/19/2015 PUMPED 20 BBL DSL DOWN TBG ATTEMPTING TEST. TBG @ 350 PSI. TAGGED 2.812" DS NIP @ 7311' RKB. DRIFTED TBG WITH DUMMY WHIPSTOCK TO 7697' SLM. READY FOR CTU? 7/22/2015 LOG RCBL FROM CEMENT RETAINER AT 7702' TO 7000'. TOP OF CEMENT FOUND AT 7620'. WEAK CEMENT STRINGER FOUND ALL THE WAY UP TO 7480'. LOG CORRELATED TO DRESSER CEMENT BOND LOG DATED 04 OCT 1983. JOB COMPLETE. 7/24/2015 (PRE CTD) : DDT-MV, SSV, SV(PASSED), PPT-MV, SSV, SV(PASSED). 7/29/2015 PERFORATE TUBING FROM 7614'-7619'WITH 2", 3 SPF, 120 DEG PHASING HSC LOADED WITH 6.7 GRAM BH CHARGES. CCL TO TOP SHOT OFFSET: 7.5', CCL STOP DEPTH: 7606.5'. LOG CORRELATED TO DRESSER ATLAS CBL DATED 4- OCT-1983. READY FOR CT. 7/31/2015 Pump 35 bbls of 15.8 ppg cement with middle 25 bbls containing 1.5 ppb of CemNet fiber. Obtained squeeze pressure with approx. 25 bbls behind pipe. Washed down to mandrel © 7,488'. Started snubbing in soft cement© 6,580' RKB. POOH washing tubing jewerly while maintaining over balanced on well. 500 psi left on tubing. Tubing left full of diesel down to 6,800' and ready for a slickline tag and pressure test in 48 hrs. *****Job in Progress***** 8/1/2015 Rig down coil, stand back Nile slick line tags TOC and performs MIT LRS. Rig •• back up on well and rear r milling in the morning. ***Job in Progres ** 8/1/2015 TAG DS NIPPLE @ 7273' SLM (7311' RKB FROM TBG TALLY& HANDOVER/7290' RKB FROM JEWELRY LOG ON 7/6/15); TAG CEMENT @ 7476' SLM /7493' RKB (CORRECTED TO JEWELRY LOG ON 7/6/15). P.T. CEMENT TO 950 PSI W/ NO LOSS IN 10 MIN. READY FOR CTU. IN PROGRESS. 8/2/2015 Mill cement from 7,491' down to retainer @ 7,702.7' RKB. Chase last gel pill to surface @ 80%washing jewelry along the way. Well freeze protected and ready for slickline. *****Job in Progress***** 8/3/2015 TAG CEMENT @ 7684' SLM/7701' RKB; DRIFT DUMMY BAKER WHIPSTOCK DRIFT TO SAME. READY FOR E-LINE (whip stock). IN PROGRESS. 8/4/2015 SET TOP OF BAKER HUGHES WHIPSTOCK 3 DEGREES ROHS AT 7660'. CCL TO TOW OFFSET: 20.6', CCL STOP DEPTH: 7639.4'. RA TAG SET DEPTH: 7667'. BOTTOM OF WHIPSTOCK AT 7670.5' LOG CORRELATED TO DRESSER ATLAS CBL DATED 4-OCT-1983. JOB COMPLETE. • Conoc©Phillips Time Log & Summary Wel!view Web Reporting Report Well Name: 1G-11 Rig Name: NABORS CDR2-AC Job Type: DRILLING SIDETRACK Rig Accept: 8/17/2015 9:00:00 AM Rig Release: 8/28/2015 8:00:00 AM Time Logs Date From To Dur S. Depth E. Death Phase Code Subcode T Comment 08/09/2015 24 hr Summary 12:00 18:00 6.00 0 0 MIRU MOVE WAIT T Standby for completion of 9ES rig move. Conducting housekeeping and painting operations. 18:00 00:00 6.00 0 0 MIRU MOVE WAIT T Standby for for completion of 9ES rig move. R/U ODS PDL, re-spool DS PDL. Conducting housekeeping, painting, and maintenance operations 08/10/2015 00:00. 06:00 6.00 0 0 MIRU MOVE WAIT T Standby for completion of 9ES rig move. Checked all connections on stack and secured for rig move. Cleaned rig cellar. 06:00 12:00 6.00 0 0 MIRU MOVE WAIT T Standby for completion of 9ES rig move. Painting and cleaning pit lining. Re-install mouse holes and housekeeping operations. Install new counter support bar and CTES counter. TOTCO inspected and calibrated all rig gauges. 12:00 18:00 6.00 0 0 MIRU MOVE WAIT T Standby for completion of 9ES rig move. Change HPU oil and 0-ring on koomey unit connection. Power up koomey unit to check for leaks. Held 1G-11 pre-spud with rig crew. Cleaned in pipe shed. 18:00 00:00 6.00 0 0 MIRU MOVE WAIT T Stanby for Completion of 9ES rig move. Prep and paint pits, unload freight, install flag pole, and hang door on hot well. Work on LAD safe system and clean up rig floor. 08/11/2015 00:00 06:00 6.00 0 0 MIRU MOVE WAIT T Standby for completion of 9ES rig move. General housekeeping, seal roof of hot well, and worked on LAD safe system. 06:00 12:00 6.00 0 0 MIRU MOVE WAIT T Standby for completion of 9ES rig move. General housekeeping, preventative maintenance, and prep cuttings pit to paint. Install riser on injector, clean all connections, and replaced 0-rings. Swap hoses on BOP stack on upper blinds and upper 2"pipe rams. Page 1 of 11 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12:00 18:00 6.00 0 0 MIRU MOVE WAIT T Standby for completion of 9ES rig move. Unlock and pressure up koomey to test BOP ram functions. Re-rig slings to BOP's. General housekeeping and preventative maintenance. 18:00 00:00 6.00 0 0 MIRU MOVE WAIT T Stand by for completion of 9ES Rig move. Continue Ospho and painting in pits. Complete Ladsafe derrick climbing system. Prep and paint DS Mast ram 08/12/2015 00:00 06:00 6.00 0 0 MIRU MOVE WAIT T Continue painting/projects on rig 06:00 12:00 6.00 0 0 MIRU MOVE WAIT T Continue with housekeeping and preventative maintenance around rig. Changed out R7 valve and cleaned shop 12:00 18:00 6.00 0 0 MIRU MOVE WAIT T Continue with housekeeping and preventative maintenance around rig. Installed blankets on ODS PDL, worked on air compressor, and started Nabors inventory system 18:00 00:00 6.00 0 0 MIRU MOVE WAIT T Perform rig condition audit, Sling log, DOMS, General housekeeping 08/13/2015 00:00 06:00 6.00 0 0 MIRU MOVE WAIT T Hook up flow line, Clean mast legs. Measure out new BOPE stack, paint PUTZ, motor man room, and Hot well, Inventory cabinets 06:00 12:00 6.00 0 0 MIRU MOVE WAIT T Change out R6, grease manual valves on stack, pulled all rams out of old stack, PM and test agitators. Work on Nabors inventory system and housekeeping. 12:00 18:00 6.00 0 0 MIRU MOVE WAIT T Good catch powerpoint, greased drag chain and shaker jacks, check and charge nitrogen koomey bottles, and work on mud lift. Work on Nabors inventory system and procedures to transfer fluid. 18:00 00:00 6.00 0 0 MIRU MOVE WAIT T Complete paiting motor man room& Hot well, Continue painting in pits, Inventory sling locker and rig floor consumables 38/14/2015 00:00 06:00 6.00 0 0 MIRU MOVE WAIT T Paint mast cylinder on rig floor, Service valves R-6&R-7, Install mouse holes, Prep under for centrifuges for paint, Replace worn/ illegible signage 06:00 12:00 6.00 0 0 MIRU MOVE WAIT T Label lines for 1 line drawings for fluid tansfers, prep under centrifuges for paint, and general housekeeping. Page 2 of 11 Time Logs • • Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12:00 18:00 6.00 0 0 MIRU MOVE WAIT T Change out damaged hydraulic line on wind wall hydraulic motor, boiler maintenance, paint mast raise cylinder, and disconnect flow line. 18:00 00:00 6.00 0 0 MIRU MOVE WAIT T Confirm new BOPE measurments, Prime pit floor, Pre spud with Kaleo's crew. Rig move checklist, Load out 2 loads to 1G 08/15/2015 Moved from 30 to OliktokY, Perform rig mat shuffle 00:00 06:00 6.00 0 0 MIRU MOVE MOB T Continue with rig move checklist, Paint mast tilt cylinders, 06:00 12:00 6.00 0 0 MIRU MOVE MOB T Paint in pit module and motorman room. Work on hot well level alarms, load out trucks for rig move, and inventory parts cabinets. 12:00 16:00 4.00 0 0 MIRU MOVE MOB T Complete rig move checklist and prep rig to move to 1G-11. Peak Oilfield trucks on location at 14:00 hrs. PJSM. Load shop, hookup jeeps and sows to rig. 16:00 21:00 5.00 0 0 MIRU MOVE MOB T Finish laying mats on 30 Pad access road. 21:00 00:00 3.00 0 0 MIRU MOVE MOB P Move CDR2 from 30 Pad to 1G-11. 08/16/2015 MOB 30 to 1G-11 00:00 23:30 23.50 0 0 MIRU MOVE MOB P Move CDR2 from 30 Pad to 1G-11. Stopped at 3K access road, 10, and Oliktok"Y"to shuffle rig mats around the rig. 23:30 00:00 0.50 0 0 MIRU MOVE MOB P Matting finished into 1G, Move from Oliktok Y 08/17/2015 Complete MIRU, Rig Accept 09:00, nipple up, complete full BOPE test,Witness waived by Jeff Jones, AOGCC 00:00 01:30 1.50 0 0 MIRU MOVE MOB P Move Oliktok Y to 1G 01:30 03:00 1.50 0 0 MIRU MOVE MOB P On 1G pad, De jeep and spot units on 1G-11 03:00 09:00 6.00 0 0 MIRU MOVE RURD P Start rig up, Start working post move check list. 09:00 10:30 1.50 0 0 MIRU WHDBO NUND P Nipple up BOP, spot and hook up Kill tank to rig,fix scaffolding in cellar to be able to access tree valves. RIG """"Note:ACCEPT 09:00 10:30 12:30 2.00 0 0 MIRU WHDBO NUND P Prep for BOP test,function test BOP's, installed 4ft riser, shell test, secure stack,grease HCR valves, set up test pump, 12:30 22:00 9.50 0 0 MIRU WHDBO BOPE P Start BOP test, Call mechanic out to investigate leak on lower shear seal rams. Could not find leak. 1 Hr NPT for NAD 22:00 23:30 1.50 0 MIRU WHDBO BOPE P Fill coil and PT inner reel iron and packoff 23:30 00:00 0.50 SLOT WELLPF CIRC P Perform slack mgmt Page 3 of 11 Time Logs • • Date From To Dur S. Depth E.Depth Phase Code Subcode T Comment 08/18/2015 124 hr Summary omplete slack mgmt, cut 75'of coil to find wire, PT PDL&TT Line, Pull BPV, Head up E-lie, M/U BHA#1, RIH and mill3.5"exit 7557.6 to 7663.6 00:00 00:12 0.20 0 0 SLOT WELLPF CIRC P Continue slack mgmt ops 00:12 00:42 0.50 0 0 SLOT WELLPF PRTS P Pressure test PDL&TT line 00:42 02:42 2.00 0 0 SLOT WELLPF CTOP P Cut 75'of pipe to find wire,test wire- Good, Prep coil for CTC Install, Move injector back for BPV removal 02:42 03:54 1.20 0 0 SLOT WHDBO OTHR P PJSM, Rig up FMC and pull BPV, Load out lubricator 03:54 04:24 0.50 0 0 SLOT WELLPF CTOP P PJSM, Install CTC and pull to 35K 04:24 06:51 2.45 0 0 SLOT WELLPF CTOP P Head up E-Line to UQC, PT CC, valve checklist,top drive inspection, test gas alarms. 06:51 08:27 1.60 0 73 PROD1 WHPST PULD P PJSM. PU/MU BHA#1, change-out little jerk dies, test MWD, stab on _wellhead,tag-up,set depth. 08:27 12:27 4.00 73 7,659 PROD1 WHPST TRIP P RIH w/BHA#1 window milling assembly,tie-in to K1 for+2' correction, relogged K1 several times, logs not matching up, decide to dry tag WS to verify correction. Dry tag whipstock @ 7,659'. PUW=34K. 12:27 21:45 9.30 7,658 7,664 PROD1 WHPST WPST P Start milling window exit: 1.52 @ BPM @ 2,697 PSI, BHP=3340 PSI, CTW=13.5K,WOB=2.5K, 1 FPH. Mill off 3 1/2 @ 7662, Contact 7"@ 7663.2 21:45 22:03 0.30 7,664 7,664 PROD1 WHPST REAM P Back ream 3.5"window 22:03 23:15 1.20 7,664 7,646 PROD1 WHPST TRIP P POOH 23:15 00:00 0.75 7,646 71 PROD1 WHPST PULD P At surface,30 min flow check, lay down BHA#1 08/19/2015 Complete Dual string exit window with rathole down to 7684, Drill Build 7684 to 7883' 00:00 00:30 0.50 71 0 PROD1 WHPST PULD P Continue to lay down BHA#1, Mill out©2.80 No-Go 00:30 01:18 0.80 0 75 PROD1 WHPST PULD P PJSM, P/U BHA#2 with 2°fixed bend WFT motor with bit box turned down and wear pad removed. Make _up to coil and surface test 01:18 02:48 1.50 75 7,220 PROD1 WHPST TRIP P RIH EDC closed pumping min rate 02:48 03:18 0.50 7,220 7,411 PROD1 WHPST DLOG P log for tie in 7220 to 7260 then run down 7380 to log K1, set down at 7365, PUH change TF from 20R to 90R, PUW=30K, clean pass @ 90R start logging @ 7380'to 7411. -5' correction 03:18 03:42 0.40 7,411 7,665 PROD1 WHPST TRIP P RIH to dry tag 7"@ 7665, PUW=32K 03:42 08:45 5.05 7,665 7,667 PROD1 WHPST WPST P 7655', Bring pumps on, 1.6 BPM @ 2930 PSI FS, BHP=3345, see motor work @ 7664.5, exit casing @ 7,667.4. Page 4 of 11 Time Logs • • Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 08:45 10:15 1.50 7,667 7,684 PROD1 WHPST DRLG P Start drilling rathole: 1.65 BPM @ 3,185 PSI, BHP=3,380 PSI, CTW=10K, WOB=.5K, ROP=6. 10:15 11:30 1.25 7,684 7,684 PROD1 WHPST REAM P Make back reaming passes through window exit per well plan, dry drift, clean. Increased ECD at window from 10.3 to 11.4, minimal losses occured. 11:30 13:27 1.95 7,684 76 PROD1 WHPST TRIP P POOH for drilling assembly 13:27 13:57 0.50 76 76 PROD1 WHPST OWFF P Flow check 30 mins, no flow. PJSM. 13:57 15:03 1.10 76 0 PROD1 WHPST PULD P LD BHA#2 15:03 16:15 1.20 0 73 PROD1 DRILL PULD P PJSM. PU/MU BHA#3 16:15 17:45 1.50 73 7,370 PROD1 DRILL TRIP P RIH w/build drilling assembly, 2.1 AKO motor and RR Hycalog bit. Stack out @ 7363 15R. Orient to 90R and run right through 17:45 17:57 0.20 7,370 7,400 PROD1 DRILL DLOG P Log K-1 for-5'correction. 17:57 18:45 0.80 7,400 7,684 PROD1 DRILL TRIP P Continue in well, Swap to 9.1 PPG FloPro, Close EDC and run through window. Clean through window 18:45 19:51 1.10 7,684 7,719 PROD1 DRILL DRLG P 7684', Drill, 1.54 BPM @ 2670PSI FS, BHP=3502 19:51 20:03 0.20 7,719 7,719 PROD1 DRILL WPRT P Ratty drilling with stalls, Had to restart MWD computer orienter not turning. PUH to just below window, PUW=34K 20:03 00:00 3.95 7,719 7,883 PROD1 DRILL DRLG P 7719' Drill, 1.54BPM @ 3040, BHP=3850, New mud at surface @ 7720' 08/20/2015 Complete build to 7915, Trip out for lateral BHA, Drill lateral 7915 to 8378 00:00 00:48 0.80 7,883 7,915 PROD1 DRILL DRLG P Drilling ahead, 1.53 BPM @3350 PSI FS, BHP=3870, WHP=280PSI 00:48 02:24 1.60 7,915 66 PROD1 DRILL TRIP P Call End of Build @ 7915,Trip out 02:24 06:00 3.60 66 0 PROD1 DRILL PULD P At surface, PJSM PUD BHA#3, Unable to pump in managed pressure. Cycle T-1 and T-2. Good @ 18 1/2 turns. Put pressure on MP line and observe hose pressureing up. No communication to well. Pump down kill line and build well pressure. Consult with town, Remove tools from well, load PDL with MWD. 06:00 12:30 6.50 0 0 PROD1 DRILL OTHR T Trouble shoot MP line blockage, remove MP hose and T1 &T2 valve, found metal screw-in plug in tree, pictures on S-drive, remove plug. Install tango valve, MP line. Retest swabs,tangos, and BL1 valve to 3,500 psi. Perform valve checklist, reinstall QTS. Establish MP. 12:30 13:24 0.90 0 73 PROD1 DRILL PULD P PJSM. PD BHA#4, skid , MU QC, test MWD,strip on wellhead,tag up, set depth. Page 5of11 Time Logs • • Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 13:24 16:06 2.70 73 7,915 PROD1 DRILL TRIP P RIH w/drilling assembly, 0.5 AKO motor, new Hycalog bit. Tie-in to K1 For-4'correction, continue in hole, unable to log RA, verify correction with B/C1 interface. 16:06 21:42 5.60 7,915 8,265 PROD1 DRILL DRLG P DOBD: 1.40 BPM @ 3,150 PSI, BHP=3,810 PSI, CTW=11.5K, WOB=1.5K, ROP=65. 21:42 22:24 0.70 8,265 8,265 PROD1 DRILL WPRT P Wiper to 7700', PUW=29K, Small spikes in DHWOB .9 @ 7851 & .3 @ 7805. 22:24 00:00 1.60 8,265 8,378 PROD1 DRILL DRLG P 8265', Drill, 1.42 BPM @ 3120 PSI FS, BHP=3880,WHP=186, Losses @ 7-10BPH 08/21/2015 Drill 8378 to 8995, Lost all returns @ Cl interface, Healed to 1 BPM Losses, Lost 996BBIs/24 Hrs 00:00 04:12 4.20 8,378 8,615 PROD1 DRILL DRLG P 8378', Drill ahead, 1.42 BPM @ 3120PS1 FS, BHP=3897 04:12 05:00 0.80 8,615 8,615 PROD1 DRILL WPRT P Wiper to 7800', PUW=29 05:00 06:00 1.00 8,615 8,626 PROD1 DRILL DRLG P 8615', Drill ahead , 1.4 BPM @ 3160, BHP=3938,WHP=200PSI, RIW=12K, started experiencing total losses, PUH. 06:00 12:00 6.00 8,626 8,708 PROD1 DRILL DRLG P Open choke fully, continue drilling, minimal returns. Pump 38 bbl hi vis pill. Drill ahead 1.44 BPM @ 2,950 PSI, BHP=3,550 PSI, CTW=12K, WOB=2K. ROP=8-20.Ankerite! Lost decreasing, MM in 1.42, MM out.78. 12:00 12:30 0.50 8,708 8,708 PROD1 DRILL WPRT P On ankerite stringer, pull BHA wiper 250', pump heavy thru thief zone at 8,626'. 12:30 15:30 3.00 8,708 8,808 PROD1 DRILL DRLG P Drill ahead: 1.46 BPM @ 2,993 PSI, BHP=3,510 PSI, CTW=1OK, WOB=1.8K, ROP=30-50. 15:30 15:45 0.25 8,808 8,808 PROD1 DRILL CIRC P Pump additional hi vis pill(40 bbls). MM out rate decreased to.40 BPM. 15:45 18:27 2.70 8,808 8,925 PROD1 DRILL DRLG P Drill ahead: 1.46 BPM @ 2,915 PSI, BHP=3,505 PSI, CTW=9.5K, WOB=@K, ROP=30-50. MM in 1.46; MM out.40. Continue drilling. 18:27 20:09 1.70 8,925 8,965 PROD1 DRILL DRLG P P/U and reset, lost diff, PUW=33K, 1.48 BPM @2730 PSI FS, BHP=3470,WHP=0, Losses=lBPM 20:09 20:45 0.60 8,965 7,750 PROD1 DRILL WPRT P Wiper trip to 7500 with tie in, PUW=30K, 20:45 21:21 0.60 7,750 7,782 PROD1 DRILL DLOG P log base of Cl, missed marker, PUH to 7730, Correction+25, inspected counter looks good. Lube counter chain. 21:21 22:00 0.65 7,782 8,989 PROD1 DRILL WPRT P RBIH,stack out at 8515 with stall, Attemp to log 8520 to 8658, Stack out @ 20 FPM, stack out @ 8666 with stall. 3K stack @ 8550, Stack @ 8670. Clear running below 8700 Page 6of11 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 22:00 23:36 1.60 8,989 8,989 PROD1 DRILL WPRT P 8995 PUH to sort depth issues with MAD pass up 7990 to 7867, RIH taking check shots 23:36 00:00 0.40 8,998 8,995 PROD1 DRILL DRLG P 8998', Drill, 1.47 BPM @ 2730 PSI FS, BHP=3500,WHP=0 08/22/2015 Drilled 8995 to 9250, None to minimal returns, lost 1579 BBIs/24 Hrs 00:00 03:36 3.60 8,995 9,011 PROD1 DRILL DRLG P 8995', Drill, 1.47 BPM @ 2730 PSI FS, BHP=3500,WHP=0, Good weight transfer, Low ROP 03:36 06:36 3.00 9,011 9,016 PROD1 DRILL DRLG P Stall, PUW=29K, Drilling 1.46 BPM @ 2930 PSI FS, BHP=3520, WHP=0, Low ROP, Returns=.45BPM. Hard ankerite, stalled, PUW=32K. Continue drilling,stalled again. 06:36 12:51 6.25 9,016 9,038 PROD1 DRILL DRLG P Drill ahead: 1.43 BPM @ 3010 PSI, BHP=3495 PSI, CTW=11.5K, WOB=2.5K, ROP less than 10. PUH, another stall @ 9,016', back ream. 12:51 15:12 2.35 9,038 9,085 PROD1 DRILL DRLG P Continue drilling: 1.43 BPM @ 3040 PSI, BHP=3520 PSI, CTW=9.5K, WOB=2.4K. Still slow going, lost returns again temporarily, pumped another 20 bbl high vis pill, returns coming back slowly, rate out.40 BPM. 15:12 17:48 2.60 9,085 9,140 PROD1 DRILL DRLG P Continue drilling: 1.45 BPM @ 3125 PSI, BHP=3485 PSI, CTW=8.5K, WOB=2.3K, ROP=25, lost returns again to.25 BPM @ 9,095', slowly increasing. 17:48 19:48 2.00 9,140 9,165 PROD1 DRILL DRLG P Drilling, Lost all returns, annular pressure drop, 1.45 BPM @ 2680 PSI FS, BHP=3299 19:48 20:36 0.80 9,165 9,165 PROD1 DRILL WPRT P 9165',Wiper to 8100', PUW=32K, B-C!transition area 8560 to 9800' looked good, small stack @ 9115 20:36 00:00 3.40 9,165 9,250 PROD1 DRILL DRLG P 9165', Drill 1.45 BPM @ 2840 PSI FS, BHP=3375, No to very little returns 08/23/2015 Drill 9250 to 9938, Minimal returns, Lost 1838 BBLs/24 Hr 00:00 04:12 4.20 9,250 9,365 PROD1 DRILL DRLG P 9250', Drill 1,45 BPM @ 2840 PSI FS, BHP=34301ow, <.2BPM returns 04:12 05:12 1.00 9,365 9,365 PROD1 DRILL WPRT P Wiper to 8300', PUW=32K 05:12 10:12 5.00 9,365 9,565 PROD1 DRILL DRLG P Drill ahead. 1.45 bpm, Rtns@0.20. BHP=3467. ROP all over. 10:12 12:12 2.00 9,565 9,565 PROD1 DRILL WPRT P Wiper trip 7760'. PUW=32K Tie in to GR @ 7742'. +7'correction. 12:12 16:48 4.60 9,565 9,765 PROD1 DRILL DRLG P Drill ahead. 1.43 bpm, Rtns@0.21, ROP=all over', BHP=3469 psi. 16:48 17:30 0.70 9,765 9,765 PROD1 DRILL WPRT P Perform wiper to 8850', PUW=31 K 17:30 20:06 2.60 9,765 9,864 PROD1 DRILL DRLG P 9765', Drilling, 1.45 BPM @ 2850 PSI FS, BHP=3478 Page 7 of 11 Time Logs • • • Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 20:06 20:18 0.20 9,864 9,864 PROD1 DRILL WPRT P Pull 100'wiper, stacking, low surface weight, PUW=36K 20:18 00:00 3.70 9,864 9,938 PROD1 DRILL DRLG P 9864', Drill, 1.45 BPM @ 2850 PSI FS, BHP=3450 08/24/2015 Drill 9938 to 10082, POOH to check BHA and P/U agitater, Lost 1527BBIs/24 Hrs 00:00 02:24 2.40 9,938 9,965 PROD1 DRILL DRLG P 9938, Drilling, 1.45 BPM @ 2850 PSI FS, BHP=3465 02:24 03:42 1.30 9,965 9,965 PROD1 DRILL WPRT P Wiper trip to 8400', PUW=31K, Small weight bobble©8645 RIH. Clean trip PUH 03:42 08:36 4.90 9,965 10,038 PROD1 DRILL DRLG P 9965', Drill 1.45 BPM @ 2850 PSI FS, BHP=3500,WHP=0 08:36 08:42 0.10 10,038 10,038 PROD1 DRILL WPRT P Wgt check/wiper to 9938'. PUW=30k. 08:42 09:12 0.50 10,038 10,038 PROD1 DRILL DRLG P Drill ahead; pumping 1.43 bpm, rtns .12. ROP=4'/hr. Pump 5/5 low/hi sweep.Sweep on bottom. 09:12 12:18 3.10 10,038 10,082 PROD1 DRILL DRLG P Drill ahead. Pump 20 bbls with full lubes. See no significant change. 1.43 in, 0.06 out, BHP=3634. ROP=9'/hr. 12:18 15:30 3.20 10,082 0 PROD1 DRILL TRIP P Begin POOH for bit check and to add agitator. PUW=30k. Rate=1.44, out=0.13, BHP=3425, Pump=2735. Attempt to follow managed press schedule. BHP=3425 psi. Overpull @ 8700'and 7893'. 15:30 17:00 1.50 0 0 PROD1 DRILL BHAH P Pressure undeploy drilling BHA, pumping down manged pressure line. 17:00 18:00 1.00 0 0 PROD1 DRILL BOPE P Perform Bi weekly BOPE function test, 18:00 19:00 1.00 0 0 PROD1 DRILL RGRP P Replace valve P7 in HP discharge line in pits 19:00 21:54 2.90 0 78 PROD1 DRILL BHAH P PJSM, M/U BHA#5 with.5°motor, new bi center bit with Helios cutters, and agitator. Pressure deploy and surface test 21:54 23:12 1.30 78 7,380 PROD1 DRILL TRIP P RIH, EDC Open 23:12 23:30 0.30 7,380 7,404 PROD1 DRILL DLOG P Tie into K1 for-7'correction, Close EDC 23:30 00:00 0.50 7,404 8,825 PROD1 DRILL TRIP P Continue in hole, clean trip through window 08/25/2015 Drill ahead from 10,082'. Attempt to drill ahead with KCL/Clay Guard from 10,220'to 10,371',trouble getting back down. Swap back to 9.1 ppg drilling mud. Continue drilling ahead with minimal returns to called TD at 10,553'. POOH. RIH with Weatherford IBP. 00:00 00:30 0.50 8,825 10,085 PROD1 DRILL TRIP P Continue in hole, EDC closed 00:30 03:30 3.00 10,085 10,285 PROD1 DRILL DRLG P 10085', Drill, 1.45 BPM @ 3300 PSI FS, BHP=3395, Swapped to KCL and clay guard, Got to bit @10,220', Lost-100PSI circ pressure off bottom. ROP coming and going like previous BHA Page 8 of 11 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 03:30 04:30 1.00 10,285 10,285 PROD1 DRILL WPRT P Wiper trip to 9285, PUW @ 38K, dragging 34K. Clean trip up, Set down @ 10110 picked up and went right through, Pumped 20 BBI sweep 04:30 05:42 1.20 10,285 10,371 PROD1 DRILL DRLG P 10220', Drill, 1.45 BPM @ 2770 PSI FS, BHP=3290, RIW=8K 05:42 05:57 0.25 10,371 10,371 PROD1 DRILL WPRT P BHA Wiper, 38k PUW. Close choke to bring up BHP. 05:57 07:15 1.30 10,371 10,371 PROD1 DRILL DRLG P Pull 200'wiper, having problems getting down. 07:15 10:09 2.90 10,371 10,485 PROD1 DRILL DRLG P Swap back to FloPro. Drilling. 10:09 11:09 1.00 10,485 10,485 PROD1 DRILL WPRT P Pull 44k off btm.wiper up to 9485', RBIH. 11:09 14:09 3.00 10,485 10,553 PROD1 DRILL DRLG P Drill ahead 1.45 BPM 3163 psi. .27 on returns, 38 ROP. Call TD @ 10553'. 14:09 15:15 1.10 10,553 7,640 PROD1 DRILL TRIP P PUH into window, stop @ 7640. 15:15 16:00 0.75 7,640 7,640 PROD1 DRILL LOT P @ 7640', Shut in choke, shut down pumps.Annular @ 3260 psi.watch for 15 minutes.Annular pretty flat @ 2845 psi. Pumps back on, leave choke closed, pump 20 bbls to get slight returns. 16:00 17:24 1.40 7,640 82 PROD1 DRILL TRIP P Pooh to surface. 17:24 18:15 0.85 82 82 PROD1 DRILL OWFF P On surface, monitor well for flow, crew change out, PJSM-lay down BHA. 18:15 19:45 1.50 82 0 PROD1 DRILL PULD P Lay down BHA#5, drop HOT and USR from BHA, configue BHA for IBP per plan forward. 19:45 21:00 1.25 0 49 COMPZ CASING PULD P PJSM-Bring in and MU 2.125" Weatherford IBP to BHA#6. 21:00 22:51 1.85 49 7,360 COMPZ CASING TRIP P RIH with BHA#6, EDC open, pump 7 bbl before catching fluid. 22:51 23:03 0.20 7,360 7,390 COMPZ CASING DLOG P Tie in at K1 for minus 8.5-ft correction, 23:03 00:00 0.95 7,390 7,636 COMPZ CASING TRIP P RIH to right above window,wait on IBP to climatize while keeping hole full. 08/26/2015 IBP pre-set above window at 7,645-ft. POOH. Retrieve IBP#1. Set Weatherford 2.125"IBP at 10,040-ft mid element. Pump beaded liner pill in 9.1 ppg mud. RIH with lower"A" liner segment-bull nose,40 jts slotted, shorty deployment sleeve. Lost 288 bbl/24 hrs. 00:00 01:30 1.50 7,636 7,645 COMPZ CASING TRIP T Continue to climatize IBP, BHT 106° to 118°, shut down pumps, close EDC, PUW above window 31k, RBIH pumps off, stack out 4k at 7,645-ft, PUW 31k, stack out at same depth 2 more times, no joy, open EDC. 01:30 04:00 2.50 7,645 49 COMPZ CASING TRIP T POOH, tie in at K1 0-ft correction, no over pull at DS nipple at 7,290-ft, getting good returns, IBP left at 7,645-ft, top of IBP at 7,638-ft. 04:00 04:30 0.50 49 49 COMPZ CASING OWFF T On surface, monitor well for flow. PJSM Page 9 of 11 Time Logs • • Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 04:30 06:15 1.75 49 44 COMPZ CASING PULD T LD IBP running tool, setting sleeve not sheared. MU IBP retrieving tool to BHA. 06:15 08:00 1.75 44 7,630 COMPZ CASING TRIP T RIH w/IBP retrieving tool.Tie in for a -8 corr. Pick up wt of 29k @ 7630'. 08:00 08:30 0.50 7,638 7,638 COMPZ CASING FISH T Pumps up, EDC closed, flowing fluid out of the pulling tool.Wash on to the fishing neck,tag @ 7638'. Shut down the pump allow to equilize& dogs on catch to retract on the F/N. Pull 4k over pulled free. PUH 30', RBIH past 7638', appears fish is on, 08:30 10:15 1.75 7,638 44 COMPZ CASING TRIP T POOH. open EDC to slow fluid in the coil to fall out above pulling tool. Pump over the top to keep hole full. 10:15 10:45 0.50 44 44 COMPZ CASING OWFF T Good no flow test, 30 minutes. PJSM for lay down. 10:45 11:15 0.50 44 0 COMPZ CASING PULD T Lay down BHA#7. Have IBP fish. Nothing apparent on IBP why it set early. 11:15 12:00 0.75 0 49 COMPZ CASING PULD T PJSM-Pick-up BHA#8, Weatherford IBP. 12:00 15:00 3.00 49 10,060 COMPZ CASING TRIP T RIH W/Weatherford IBP(with EDC open)tie in for-8 corr. RIH to 10,060° NOTE: Trouble time stops at 14:00 when window passed. 15:00 15:45 0.75 10,060 10,040 COMPZ CASING PACK P Pull up hole, 31k stop @ 10040'mid element. Close EDC, DP bore/annular increasing again.Watch for 15 minutes&allow plug to climatize. Pressure up down coil in stages, plug set @ 1300 psi. Pick off plug clean. 15:45 19:00 3.25 10,040 48 COMPZ CASING CIRC P Open EDC, line up pumps down coil thru EDC. Line up for 9.1 beaded pill, displace down to EDC. POOH. 19:00 19:30 0.50 48 48 COMPZ CASING OWFF P On surface, monitor well for flow. PJSM for BHA lay down. 19:30 20:00 0.50 48 0 COMPZ CASING PULD P LD BHA#8. 20:00 20:45 0.75 0 0 COMPZ CASING PUTB P Prep floors for running liner. 20:45 00:00 3.25 0 1,254 COMPZ CASING PUTB P PJSM-MU bull nose,40 jts slotted, shorty deployment sleeve. 08/27/2015 Run"A"liner in 2 segments, lower-bull nose,40 jts slotted, shorty deployment sleeve from 10,030-ft to 8,776-ft. Upper-ported bull nose, 1 jt slotted,XO, 32 jt solids, Halliburton SwellPacker, 3 jts solids,XO,2 solid pup jts, SBR deployment sieve, unable to get to bottom, top of SBR at 7,625-ft, est 24-ft open hole between liner segments. Swap well over to seawater. Freeze protect from 2,500-ft. PUD BHA#10. Begin flushing stack. 00:00 01:00 1.00 1,254 1,298 COMPZ CASING PUTB P MU bull nose,40 jts slotted, shorty deployment sleeve to BHA#9 01:00 03:42 2.70 1,298 10,030 COMPZ CASING RUNL P RIH with BHA#9.Tie in to flag for minus 13.5-ft correction. PUW 30k. RBIH.on depth, PUW 35k, RBIH. release off liner at 10.030-ft, PUW 29k. reset depth counters. Page 10 of 11 • • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 03:42 06:33 2.85 8,776 44 COMPZ CASING DISP P Open EDC, line up pumps down coil thru EDC. Line up for 10.0 ppg NaCI/NaBr beaded pill, displace down to EDC. POOH. 06:33 07:00 0.45 44 44 COMPZ CASING OWFF P Tag up.Watch well for flow for 30 minutes. No flow,top off well. 07:00 08:30 1.50 44 0 COMPZ CASING PUTB P PJSM. Lay down BHA#9. 08:30 12:45 4.25 0 1,171 COMPZ CASING PUTB P PJSM. PU liner run#2.jt of slotted, solid 33,jts, Halliburton swell PKR (measured @ 2.68"at the element)3 jts of solid, &deployment sleeve. 12:45 17:24 4.65 1,171 8,747 COMPZ CASING RUNL P RIH w/liner run#2. See flag @ -48.64 on BHi counter???Run by K-1 on the fly, see+6'corr. Had to work&cycle pipe @ 8695', 8721, (4), 8747(18)times. Hard tag @ 8747'. Pumped off&subtracted liner from counter. Re-log K-1 for a+7' correction. RBIH,tag top of upper liner @ 7625'.Top should be 7649'. 24'high. Confer with town. 17:24 19:45 2.35 7,625 2,500 DEMOB WHDBO DISP P Swap well over to seawater, POOH. MI-PJSM, RU LRS. P/T lines and equipment, pump 30 bbl diesel down tubing, RDMO LRS. 19:45 20:45 1.00 2,500 44 DEMOB WHDBO FRZP P Freeze protect from 2,500-ft, POOH. 20:45 22:45 2.00 44 0 DEMOB WHDBO PULD P PJSM-Undeploy and LD BHA#9 22:45 00:00 1.25 0 0 DEMOB WHDBO RURD P Flush stack&surface line with inhibited FW, clean pits. 08/28/2015 Flush and inhibit coil, surface lines and stack. Set BPV. ND BOPE. RDMO Rig release @ 08:00. 00:00 02:00 2.00 0 0 DEMOB WHDBO RURD P Flush stack&surface line with inhibited FW, clean pits. 02:00 05:30 3.50 0 0 DEMOB WHDBO MPSP P PJSM-Bring in FMC equipment. Attempt to set BPV, running tool not working right. FMC hand hotshot for another running tool and backup BPV. Set BPV.Test from below. Off load FMC equipment. 05:30 07:00 1.50 0 0 DEMOB WHDBO RURD P Nipple down BOPE. Check tree bolts(40 minutes, 11 loose bolts) Note: Final SITP 90 psi 07:00 08:00 1.00 0 0 DEMOB WHDBO RURD P Complete rig move checklist Note: ** Rig released at 0800 hrs Page 11 of 11 1G-11 WELL WORK SUMAMRY IIIP DATE SUMMARY POST-RIG WELL EVENTS 9/1/2015 TAGGED LINER TOP @ 7625' RKB W/2.75" BAR BELL ASSY&2.46" LIB. SET 35 KB PACKER W/AVA SEAL ASSY IN LINER TOP © 7625' RKB. IN PROGRESS. 9/2/2015 MEASURED BHP @ 7615' RKB: 2775 PSI. SET 2.75"AVA CATCHER ON KB PACKER @ 7620' RKB. PULLED DV's FROM 6164', 5299', 4127', &2705' RKB. SET 1/4" OV @ 6164' RKB. SET 3/16" GLV's @ 5299', 4127', &2705' RKB. PULLED CATCHER. IN PROGRESS. 9/3/2015 RAN TEST TOOL TO KB PACKER @ 7620' RKB. MITT 2500 PSI, PASSED. COMPLETE. VS3- 3k 2C0ZGy WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. August 13, 2015 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 DATA LOGGED ri2r2oi 5 Anchorage, Alaska 99501 rvi.K.BENDER RE: Radial Cement Bond Log, Perforation,Whipstock Record: 1G-11 Run Date: 07/22/2015, 07/29/2015, and 08/04/2015 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com 1G-11 Data in LAS format, Digital Log Image files ``' `m; °` ` 1 CD Rom 50-029-21008-00 Radial Cement Bond Log (Field Print) Ai; 1 Color Log 50-029-21008-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Fanny Sari 6900 Arctic Blvd. SCANNED Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signe.? 4 v Y% -V31 WELL LOG TRANSMITTAL PROACTIVE DIAgNOSTIC SERVICES, INC. DATA LOGGED $/5/201 K BEND R To: AOGCC E C E I V E / Makana Bender 333 West 7th Avenue Suite 100 AUG 04 201.i Anchorage, Alaska 99501 (907) 793-1225 C f> ' RE : Cased Hole/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper/MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: ProActive Diagnostic Services, Inc. Attn: Robert A. Richey - -- — 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 UMW 1) Coil Flag 11-Jul-15 1G-11 CD 50-029-21008-00 2) Signed : � 6.e..01.4 "( Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-8952 E-MAIL: PDSANCHORAGE(5 MEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D\Ach,ves\MasterTemplateFdes\Templates\Distribution\TransmittalSheets\ConocoPhillips_Transmit docx Loepp, Victoria T (DOA) From: Eller,J Gary <J.Gary.Eller@conocophillips.com> Sent: Monday,July 27, 2015 3:48 PM To: Loepp, Victoria T (DOA) Subject: RE: Revised Plan to Plug C-Sand Perfs in KRU 1G-11 (183-131, 315-325) Follow Up Flag: Follow up Flag Status: Flagged Thanks much. -Gary From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent: Monday, July 27, 2015 3:44 PM To: Eller, J Gary Subject: [EXTERNAL]RE: Revised Plan to Plug C-Sand Perfs in KRU 1G-11 (183-131, 315-325) Gary, The proposed modifications outlined below to the plug for redrill sundry(315-325) are approved. Please include this approval with your copy of the approved sundry. Thanx, Victoria Victoria Loepp SCANNED AUG 1 3 2015 Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loeppt alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loepp@alaska.gov From: Eller, J Gary [mailto:J.Garv.Eller@conocophillips.com] Sent: Monday, July 27, 2015 3:38 PM To: Loepp, Victoria T(DOA) Cc: Winfree, Mike A; Venhaus, Dan E; Allsup-Drake, Sharon K Subject: RE: Revised Plan to Plug C-Sand Perfs in KRU 1G-11 (183-131, 315-325) Victoria—We performed our cement plugging operation on KRU 1G-11 as per the revised sundry approval for#315-325, but our results indicate that we were only partially successful in placing cement where we desired. We need to pump cement a second time to fully isolate the C-sand perfs. We request permission to amend the sundry 315-325 to perforate 1 the 3W tubing at 7614'-7619' MD to aid this second cement job. Please note that this same perf interval was initially approved by the AOGCC on May 28 via the initial sundry application before we decided that these perfs would not be needed. The updated pre-CTD procedure is below: 1. Slickline: Pull dummy GLV at 7,775' MD and 7,505' MD and conduct an injectivity test. DONE 2. E-line: Shoot perfs in 3'/"tubing at 7710'-20' MD. DONE 3. Pump: Perform injection test into C-sand perfs DONE 4. Coiled Tubing: RIH with CCL to correlate depth. RIH with cement retainer, set at 7700' MD. Cement 3W x 7" annulus adjacent to C-sand perfs. Sting out, circulate clean. DONE 5. E-line: Shoot perfs in 3W tubing at 7614'-19' MD. 6. Coiled Tubing: Cement squeeze 3%"x 7"annulus adjacent to C-sand perfs. Circulate clean. Allow cement to cure. 7. Coiled Tubing: Drill out cement inside 3W tubing down to retainer at 7700' MD. 8. Slickline: Drift with dummy whipstock 9. E-line: Set whipstock at 7660' MD 10. Prep site for Nabors CDR-2AC, including setting a BPV Please let me know if you need additional information, and thanks for your help. -Gary Eller From: Loepp, Victoria T(DOA) [mailto:victoria.loeppOalaska.gov] Sent: Friday, June 26, 2015 11:57 AM To: Eller, 3 Gary Subject: [EXTERNAL]Re: Revised Plan to Plug C-Sand Perfs in KRU 1G-11 (183-131, 315-325) Gary, The proposed modifications outlined below to the plug for redrill sundry(315-325) are approved. Please include this approval with the approved sundry. Thanx, Victoria Sent from my iPhone On Jun 26, 2015, at 10:54 AM,Eller, J Gary<J.Gary.Eller@conocophillips.com>wrote: Victoria—We would like to make a revision to the plan for plugging the C-sand perfs in KRU 1G-11 (183- 131)from what was approved via sundry 315-325. The original submission for pre-CTD work called for perforating the tubing at 7,660'-7,665' MD and 7,614' —7,619' MD in preparation for a cement squeeze on the C sand perfs with service coil. On June 21w, a leak was detected at the 3%" Otis production mandrel at 7,505' MD. The leak at the mandrel requires a minor change to the procedure for placing cement in the 3%" x 7" annulus to support our 2 string casing exit. The revised pre-CTD work procedure is below. We plan to reduce the number of intervals we perforate in the 3'/2'tubing, and we'll use a cement retainer to aid in placement of the cement. 1. Slickline: Pull dummy GLV at 7,775' MD and 7,505' MD and conduct an injectivity test. 2. E-line: Shoot perfs in 3'/z'tubing at 7710'-20' MD. 2 2..co X01 WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. July 22, 2015 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 DATA LOGGED Anchorage, Alaska 99501 $ip{/2015 K.BENDER RE: Perforation Record &Jewelry Log: 1G-11 Run Date: 7/6/2015 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Chris Gullett, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com 1G-11 Digital Data in LAS format, Digital Log Image file 1 CD Rom 50-029-21008-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline& Perforating Attn: Chris Gullett 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-273-3527 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed:/ ' ✓t 2S 4Li - / ed.t eat PTO l g3 —1 3 Loepp, Victoria T (DOA) From: Loepp,Victoria T (DOA) Sent: Friday, June 26, 2015 11:57 AM To: Eller,J Gary Subject: Re: Revised Plan to Plug C-Sand Perfs in KRU 1G-11 (183-131, 315-325) Gary, The proposed modifications outlined below to the plug for redrill sundry(315-325) are approved. Please include this approval with the approved sundry. Thanx,Victoria Sent from my iPhone SCANNED JUL 2 12015 On Jun 26, 2015, at 10:54 AM, Eller, J Gary<J.Garv.Eller@conocophillips.com>wrote: Victoria—We would like to make a revision to the plan for plugging the C-sand perfs in KRU 1G-11 (183- 131)from what was approved via sundry 315-325. The original submission for pre-CTD work called for perforating the tubing at 7,660'-7,665' MD and 7,614' —7,619' MD in preparation for a cement squeeze on the C sand perfs with service coil. On June 21', a leak was detected at the 3W Otis production mandrel at 7,505' MD. The leak at the mandrel requires a minor change to the procedure for placing cement in the 3W x 7" annulus to support our 2 string casing exit. The revised pre-CTD work procedure is below. We plan to reduce the number of intervals we perforate in the 3%"tubing, and we'll use a cement retainer to aid in placement of the cement. 1. Slickline: Pull dummy GLV at 7,775' MD and 7,505' MD and conduct an injectivity test. 2. E-line: Shoot perfs in 3W tubing at 7710'-20' MD. 3. Pump: Perform injection test into C-sand perfs 4. Coiled Tubing: RIH with CCL to correlate depth. RIH with cement retainer, set at 7700' MD. Cement 3W x 7" annulus adjacent to C-sand perfs. Sting out, circulate clean. 5. Slickline: Drift with dummy whipstock 6. E-line: Set whipstock at 7660' MD 7. Prep site for Nabors CDR-2AC, including setting a BPV None of the drilling operations for the proposed laterals has changed from what was submitted on sundry 315-325. Please let me know if you need additional information regarding this request to revise the 10- 403 for 1G-11. 1. Gary Eller Wells Engineer ConocoPhillips - Alaska work: 907-263-4172 cell: 907-529-1979 1 4 iOF rjr. • I�j��s. THE STATE Alaska Oil and Gas i3 ofAT dAsKA Conservation Commission '• trit =_-_ .. 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 OF r'.' P Main: 907.279 1433 ALAr� ' Fax 907.276 7542 www.aogcc.alaska.gov SCANNED JUN 0 5 2015 Cody Pohler 3 1 CTD Engineer � lf ConocoPhillips Alaska, Inc. is:...3.,:,,,..,________.--• P.O. Box 100360 Anchorage, AK 99510 Re: Kuparuk River Field,Kuparuk River Oil Pool, KRU 1G-11 Sundry Number: 315-325 Dear Mr. Pohler: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P Foerster Chair DATED this g Zof May, 2015 Encl. STATE OF ALASKA 1* , ;KA OIL AND GAS CONSERVATION COMI. ION . APPLICATION FOR SUNDRY APPROVALS 20 MC 25.280 1.Type of Request Abandon r Plug Perforations J - Fracture Stimulate r Pull Tubing r Operations Shutdown r Suspend r Perforate r Other Stimulate r After Casing r Change Approved Program r Plug for Redrill P, Perforate New Pool r Repair Well r Re-enter Susp Well r Other. I- 2 2 Operator Name 4 Current Well Class 5 Permit to Drill Number ConocoPhillips Alaska, Inc. • Exploratory r Development pw• 183-131 ' 3 Address Stratigraphic r Service r 6.API Number: P.O.Box 100360,Anchorage,Alaska 99510 50-029-21008-00 - 7.If perforating, What 8 Well Name and Number Regulation or Conservation Order governs well spacing in this pool? I Will planned perforations require spacing exception? Yes r No 7/ KRU 1G-11 • 9 Property Designation(Lease Number) 10.Field/Pool(s): ADL 25640 - Kuparuk River Field/Kuparuk River Oil Pool • 11 PRESENT WELL CONDITION SUMMARY Total depth MD(ft) Total Depth TVD(ft) Effective Depth MD(ft) Effective Depth TVD(ft). Plugs(measured) Junk(measured): 8208 • 6918 - Casing Length Size MD TVD Burst Collapse CONDUCTOR 68 16 106' 106' SURFACE 2314 10.752351' 2206' RECEIVED PRODUCTION 8151 7 8188' 6901' MAY 2 C 2015 51zcfl /5 AOGGC Perforation Depth MD(ft): Perforation Depth TVD(ft) Tubing Size Tubing Grade: Tubing MD(ft) 7540-7590,7676-7722,7945-7950,7960-7982 6355-6397,6469-6507,6694-6698,6706-6725 3.5 L-80 7366 Packers and SSSV Type. Packers and SSSV MD(ft)and TVD(ft) PACKER-BAKER FHL RETRIEVALBE PACKER MD=7258 TVD=6124 PACKER-OTIS RRH PACKER MD=7402 TVD=6241 PACKER-OTIS WD PACKER MD=7813 TVD=6583 SAFETY VLV-CAMCO TRDP-1A SAFETY VALVE MD= 939 Pin-1 Q48 N/1' 12.Attachments. Description Summary of Proposal rte' 13 Well Class after proposed work Detailed Operations Program r BOP Sketch r Exploratory r Stratigraphic r Development jW. Service r 14.Estimated Date for Commencing Operations 15 Well Status after proposed work 6/9/2015 OIL r VVINJ r WDSPL r Suspended P 16 Verbal Approval Date GAS r WAG r GSTOR r- SPLUG r Commission Representative GINJ r Op Shutdown r Abandoned r 17 I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Cody Pohler @ 265-6435 Email Cody J Pohlerconocophillios corn Printed Name Cod P..:.-r Title CTD Engineer Signature Ar, OK/>_ Phone 265-6435 Date 6/g�• a0 K.-- Commission Use Only Sundry Number: 2 n r Conditions of approval. Notify Commission so that a representative may witness 31 2 `�j Plug Integrity r BOP Test fr` Mechanical Integrity Test r Location Clearance r Other ea P r7-5 f 71-0 50 Co ,5, nA p 5 yo /'s 22 7-0 N 5 , /--i'l r7 L,I.q r `err f« l r i--z5 /- /-z, 2 X00 p S . 4-1tP-1 / ICI 1C 17ILCI /7jctCt� i ;1i pre.: 1,- -e ptr �2fi ,•?.�"C Z5, /I2( t Spacing Exception Required? Yes No I,/ Subsequent Form Required /O _ zr 0''7 APPROVED BY S 7 Q / S Approved byaleCOMMISSIONER THE COMMISSION Date -C- " A ro Id 12y�months frofff�111/i the date of approval. Submit Form and Form 10-403 Revised 5/2015 p� roctiNisAl.Cor r ' s/Z '/, pp Att c ents in Duplicate VTt 5/27/'5 ' ` y7;/� BDMSM JUN 3 7015 KRU 1G-11 CTD Summary for Perforating & Cementing Sundry (10-403) Summary of Operations: Well 1G-11 was a Kuparuk A-sand/C-sand producer(development)well equipped with 3'/2"tubing and 7"production casing. The well was recently worked over in February 2015. The CTD laterals will target the Kuparuk C-sands to the north and south of the current location. The existing A-sand perfs have been isolated with a CA-2 plug in the D nipple at 7,831' MD. Prior to drilling,the existing C-sand perfs will be squeezed with cement to provide a means to kick out of the 3- 1/2"tubing and 7"casing. Close to 100' of cement will be left over the CA-2 plug isolating the A-sand perforations. ConocoPhillips requests a variance from the requirements of 20 AAC 25.112(c)(1) to plug the A & C-sand perfs in this manner. After plugging off the existing C-sand perfs with cement,mechanical whipstocks will be placed in the 3-1/2"tubing at the planned kickoff points. The 1G-11A sidetrack will exit through the 3-1/2"tubing and the 7"casing at 7,660' MD, and the AL2 lateral will exit at 7,614' MD. Sidetrack 1G-11A will target the Cl sands to the south,AL1 will target the C3 and C4 sands to the south, and AL2 will target the C3 and C4 sands to the north. The laterals will be completed with 2-3/8" slotted liner from TD with the liner top located inside the 3-1/2"tubing at 7,655' MD and 7,610' MD. ro rti� �� 3 CoNGv� CTD Drill and Complete 1G-11 Lateral: August 2015 `C h flees S/erkel /8/1*( Ma( Pre-CTD Work r To Thf Ori f/'4! llkte aha sr be 04 To ('fco.,i( ant rt*4:A4 !divvy 1. RU Slickline: Pull dummy GLV at 7,775' MD and 7,505' MD and conduct an injectivityor foe. test 2. RU E-line: Perform a GR/CCL correlation log and then perforate tubing at 7,660— Cow,' 7,665' MD and 7,614' —7,619' MD j000.041 3. RU Service Coil: Cement squeeze C-sand perforations 4. RU Slickline: Tag top of cement and pressure test 5. RU Service Coil: Mill out cement in the 3-1/2"tubing 6. RU Slickline: Dummy whipstock drift run to 7,700' MD 3120) 7. RU E-line: Set Baker Hughes 3-1/2"monobore XL whipstock at 7,660' MD 8. Prep site for Nabors CDR2-AC, including setting the BPV Rig Work 1. MIRU Nabors CDR2-AC rig using 2"coil tubing. NU 7-1/16"BOPE,test. 2. 1G-11A Lateral( South Cl sand) a. Mill 2.80"window at 7,660' MD. b. Drill 3"bi-center lateral to TD of 10,976' MD. c. Run 2%" slotted liner from TD up to 8,640' MD,with a liner top billet. 3. 1G-11AL1 Lateral (South C3 &C4 sands) a. Drill 3"bi-center lateral to TD of 11,025' MD. b. Run 2%" slotted liner from TD up to 7,655' MD,just above top of whipstock. 4. 1G-11 AL2 Lateral(North C3 &C4 sands) a. Set Baker Hughes 3-1/2"monobore XL whipstock at 7,614' MD b. Mill 2.80"window at 7,614' MD. c. Drill 3"bi-center lateral to TD of 10,303' MD. d. Run 2%"slotted liner from TD up to 7,609' MD,just above top of whipstock. Page 1 of 2 5/22/2015 • 5. Freeze protect. Set BPV,ND BOPE. RDMO Nabors CRD2-AC. Post-Rig Work 1. Pull BPV. 2. Obtain static BHP and install GLV's(if needed). 3. Return to production Page 2 of 2 5/21/2015 Loepp, Victoria T (DOA) From: Pohler, Cody J <Cody.J.Pohler@conocophillips.com> Sent: Wednesday, May 27, 2015 1:42 PM To: Loepp, Victoria T (DOA) Subject: RE: KRU 1G-11(PTD 183-131, Sundry 315-325) Plug for Redrill MPSP Victoria, Below is the MPSP: Drilling Hazards Information and Reservoir Pressure (Requirements of 20 AAC 25.005 (c)(4)) Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005(c)(4)(a)) A static bottom hole pressure of 1G-11 in January 2015 indicated a reservoir pressure of 2794 psi or 8.4 ppg equivalent mud weight. The maximum down hole pressure in the 1G-11 pattern is at 1H-08 with 2898 psi. Using the 1H-08 pressure as the maximum possible, the maximum possible surface pressure, assuming a gas gradient of 0.1 psi/ft,would be 2270 psi. If you would like it in an attachment or another format please let me know. Thanks, Cody Pohler I CTD Engineer Office:907-265-6435 I Cell: 281-409-7869 cody.j.pohler@conocophillips.com ConocoPhillips AIa;Ka From: Loepp, Victoria T(DOA) [mailto:victoria.loepp(aalaska.gov] Sent: Wednesday, May 27, 2015 9:47 AM To: Pohler, Cody J Subject: [EXTERNAL]KRU 1G-11(PTD 183-131, Sundry 315-325) Plug for Redrill MPSP Cody, Please provide MPSP. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer 1 KUP PROD 1G-11 Conoco PhiHHips g Well Attributes Max Angle&MD TD • Alaska,IOCWellbore APIIUWI Field Name Wellbore Status ncl('1 MD(ftKB) Act Btm(ftKB) rrm'Nhin.pr 500292100800 KUPARUK RIVER UNIT PROD 41.68 4,900.00 8208.0 ... Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) "Rig Release Date 1G-11,4272015 321:59 PM SSSV:NONE 100 12/16/2013 Last WO: 3/152015 40.99 9/19/1983 Vertical schematc(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date HANGER;31 2 ��•11�� -- - Last Tag:SLM 7,946.0 6/10/2014 Rev Reason:GLV C/O,SET PLUG lehallf 4/24/2015 i Casing Stnngs Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I Grade Top Thread I,,' I CONDUCTOR 16 15.250 38.0 1060 106.0 65.00 H-40 WELDED lit 1'I I Casing Description OD(in) 'ID(in) Top(ftKB) Set Depth(ftKB) 'Set Depth(TVD)... Wt/Len(L..Grade Top Thread SURFACE 103/4 9.950 37.0 2,351.3 2,206.1 45.50 J-55 BTC III I Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth)TVD)... Wt/Len(I...Grade Top Thread IIIIIIIIIIIIIIII IIIPRODUCTION 7 6.276 37.1 8,187.7 6,900.9 26.00 J-55 BUTT Tubing Strings CONDUCTOR;38.0-106.0 Tubing Description I String Ma...I ID(in) I Top(ftKB) I Set Depth(ft..JSet Depth(TVD)(...I Wt(Ib/ft) 'Grade I Top Connection ' I TUBING-WO 312 2.992 31.2 7,366.3 6,211.7 9.30 L-80 EUE8rd mod Completion Details I Nominal ID SURFACE;37.1-2.3513- Top(ftKB) Top(TVD)(ftKB) Top Ino((•) Item Dec Corn (in) 31.2 312 0.10 HANGER CIW TUBING HANGER 2.992 GAS LIFT,2.726.2 72275 6,098.8 35.87 LOCATOR LOCATOR SUB 2.990 7,228.5 6,099.6 35.87 SEAL ASSY BAKER 80-40 SEAL ASSEMBLY 2.990 7235.8 666:,011209359...856 ,105.5 35.85 PER BAKER 80-40 PBR 4.000 7,258.3 6,123.8 35.81 PACKER BAKER FHL RETRIEVALBE PACKER 2.910 GAS LIFT;4,148.1 7,311.1 6,166.7 35.63 NIPPLE CAMCO DS NIPPLE(PULLED RHC AND BALL AND 2.812 ROD,4 15 15) 7,359.8 6,206.3 35.23 OVERSHOT POOR BOY TUBING OVERSHOT 3.750 055(JET,5.320.5 Tubing Description 'String Ma...IID(in) 'Top(ftKB) Set Depth(ft..'Set Depth(ND)(...I Wt(Ibliry (Grade 'Top Connection TUBING-ORIGINAL 4 2.992 7,361.3 7,841 2 6,606.2 9.20 J-55 FL4S Completion Details Nominal ID GAS LIFT;8,185.3 Top E Top(TVD)(ftKB) Top Inel("1 Item Des Com (in) 7,376.2 6,219.7 35.10 SBR OTIS SBR(2.81"X NIPPLE PROFILE) 2.813 II. 7,402.3 6,241.2 34.87 PACKER OTIS RRH PACKER 2.970 7,541.7 6,356.6 33.5; BLAST RINGS BLAST RINGS(3) 2.992 GAS LIFT;6.832.4 7,657.2 6,452.9 33.7' BLAST RINGS BLAST RINGS(3) 2.992 7,812.7 6,582.3 33.2: LOCATOR OTIS LOCATOR 2.992 GAS LIFT;7,171.4 7,813.1 6,582.6 33.2: PACKER OTIS WD PACKER 4.000 7,816.5 6,585.4 33.2 MILLOUT OTIS MILL OUT EXTENSION 4.410 7,830.8 6,597.4 33.1 NIPPLE CAMCO D NIPPLE NO GO 2.750 LOCATOR;7,2T/.5- 7,$40.4 6,605.5 311. WLEG OTIS WIRLINE RE-ENTRY GUIDE,ELMD TTL @ 7822 3.015 SEAL ASSY;7,228.5 _ during PPROF on 9272007 PBR;7,25.8 Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) PACKER;7,258.3 11::. Top(ND) TopInclTop(1850) (ftKB) Ci Des Com Run Date ID(in) 7.83106,597.6 33.15 PLUG CA-2 PLUGw 12f1 of SAND 4/23/2015III NIPPLE;7,311.1 Perforations&Slots Shot Dens Top(ND) Btm(ND( (shotslf Top(ftKB) Btm(ftKB) (ftKB) (ftKB) Zone Date t) Type Com7,540.0 7,590.0 6,355.2 6,396.9 C-4,1G-11 12/23/1983 12.0 (PERF 120 deg Phasing;5" OVERSHOT;7,359.8 Dresser Atlas 7,676.0 7,722.0 6,468.5 6,506.7 C-1,1G-11 12/23/1983 12.0 (PERF 120 deg Phasing;5" SBR;7,37fi.2 Dresser Atlas PACKER;7,402.3 7,945.0 7,950.0 6,693.5 6,697.7 A-5,1G-11 3/30/1984 4.0 APERF 90 deg Phasing;RigidJet PRODUCTION;2437.7fit 7,960.0 7,980.0 6,706.2 6,723.2 A-4,1G-11 11/26/1993 4.0 APERF 180 deg.Phasing;163 CCW orientation;25/8" PRODUCTION;7,504.8 Er Titan HC II7,980.0 7,982.0 6,723.2 6,724.9 A-4,1G-11 3/30/1984 4.0 APERF 90 deg Phasing;RigidJet IPERF;7,540.0-7,590.0- 1Mandrel Inserts St ati 1 on Top(TVD) Valve Latch Port Size TRO Run N Top(MOB) (ftKB) Make Model OD(in) Sery Type Type (In) (psi) Run Date Cent IPERF;7.676.47,722.0- 1 2,726.2 2,522.7 CAMCO MMG 11/2 GAS LIFT DMY RK 0.000 0.0 3/23/2015 _ 2 4,148.1 3,673.7 CAMCO MMG 11/2 GAS LIFT DMY RK 0.000 0.0 3/23/2015 s 3 5,320.5 4,582.8 CAMCO MMG 112 GAS LIFT *MY RK 0.000 0.0 3/23/2015 45 6,185.3 5,260.1 CAMCO MMG 11/2 GAS LIFT ItRK 0.000 0.0 4/15/2015 PRODUCTION;7,775.2 6,832.4 5,780.0 CAMCO MMG 11/2 GAS LIFT eMY RK 0.000 0.0 3/23/2015 7,171.4 6,053.4 CAMCO MMG 11/2 GAS LIFT WY RK 0.000 0.0 3/23/2015 7,437.7 6,270.2 OTIS SPM 1 PROD *PEN BEK 0.000 0.0 4/23/2015 LOCATOR;7,812.7 ' PACKER;7,813.18 7,504.8 6,325.9 OTIS SPM 1 PROD *MY BK 0.000 00 4/23/2015 MILLOUT;7,816.5 y ® 9 7,775.2 6,551.0 OTIS SPM 1 PROD OPEN BEK 0.000 0.0 4/23/2015 Notes:General&Safety End Date Annotation NIPPLPLUG;7,831.0 1/20/2004 NOTE:Views Schematic w/Alaska Schematic9.0 ATION PLUE;7,831.0 5 WLEG;7,840.4- , APERF;7,945.0-7,950.0 APERF;7,9600.7,980.0-. APERF;7,980.0-7.962.0 PRODUCTION;37.1-8,187.7 , d. rn a _ C N 7 It) MO i0 'CI _ N ED 9 Q OO _O to nr d 2 CD r La o .c _ co b a) ea b a E 0 Q m II rn ° C M- Q m st N r-- r- d -p_O d Or _N a Q . c N45 TS 00 II 'n t $ g �" in co oo_c o 0 0' cr) ` m Q U Q a o= a0 r''.0 �w cv- , a) m e_ Chan Q- Q O 0 N Q V d w O Nr O) r @.).E. I,-o M r co O"4---0 0 cc m �� v t4 co v e-N 0M Q ? N O 00 D. N(U N r CO Ym g� o. o -n 0 0_a0 (7M EO C • C 1•7. 2 UM N El`�' O co 2r N^ S1 v E M `v' O1�V t` C Oto O 16 W QM ,��q� C O O 1,- '62r- '2 O 2r o D Caw W f0 ., © m c d� O_ W 2C6 �N co d S rn (.1',..;') w O W- 0 Y - r_ CU 0.--.= fO m 121 d o 0. -Jo coo. - a co) o cO n - C.) 0.-o) IuuU EEE O^.0• Q `V M M .\ II I 11 I i /, , ,/,'::'''' ,,,,,,,,/,,, /..%;;;' //' g. i olo , , 4„„,„„,,,,,,v,.., /,,,,, ,..„..,7,..,.:,,,„ , /z c III ' 7 �7 3 N . .. • _ ' ' ' � . a"io -.1 ..ear 0,tM4, '..zV 0 III In U I (1) CO CO N US CI. �Q 0 Q��� NQ p `nom oN -2 2 N.o.o In= �2 CL O M-U LO CAN COO a0 0 `C 00 -7a0 COCO LO 'C 1�r O O a� co r N cu ,0. IQ 7t© o'v� CD NN �- Na��O`` '^ _� O CLCD �} Er y�10 r V J. NCO 19 2 N U M M Q r-- co" coo o y 000w II II E.0� O CtO° YQI:I: Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box in the Patricia or Steve upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Patricia or Steve work) the initial reviewer will cross out that erroneous entry and initial it on / both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, then check the "Suspended" box and initial that change. Guy or Victoria The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug for Jenni Redrill" box, she will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states"Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, she will check the History tab Jenni in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, she will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will change Jenni the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Jenni Geologists will check the "Well by Type Work Outstanding" user query in Patricia or Steve RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. RECEIVED r f STATE OF ALASKA • APR 0 7 2015 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND 4,• c CC 1a.Well Status: Oil ❑ Gas ❑ SPLUG ❑ Plugged ❑ Abandoned ❑ Suspended ❑, 1 b.Well Class: 20AAC 25.105 20AAC 25.110 Development ❑ • Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other ❑ No.of Completions: Service ❑ Stratigraphic Test LI 2.Operator Name: 5.Date Comp.,Susp., 12.Permit to Drill Number: ConocoPhillips Alaska, Inc. or Aband.: March 23,2015 183-131 /315-087 -- 3.Address: 6.Date Spudded: 13.API Number: P.O. Box 100360,Anchorage,AK 99510-0360 September 7, 1983 50-029-21008-00-Do , 4a.Location of Well(Governmental Section): 7.Date TD Reached: 14.Well Name and Number: Surface: 327'FSL, 806'FWL, Sec. 29,T12N, R10E, UM September 15, 1983 KRU 1G-11 - Top of Productive Horizon: 8. KB(ft above MSL): 99'RKB 15.Field/Pool(s): 1517'FNL, 1307'FEL,Sec.32,T12N, R10E, UM GL(ft above MSL): 63'AMSL Kuparuk River Field Total Depth: 9.Plug Back Depth(MD+TVD): 1749'FNL, 1001'FEL, Sec. 32,T12N, R10E, UM 7359'MD/6200'TVD ' Kupuruk River Oil Pool 4b.Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16.Property Designation: Surface: x-540585.5 y- 5980976 Zone-4 8208'MD!6918'TVD ADL 25640 TPI: x-543769 y- 5979150 Zone-4 11.SSSV Depth(MD+TVD): 17.Land Use Permit: Total Depth: x-544077 y- 5978920 Zone-4 none 2571 18.Directional Survey: Yes ❑ No 0 19.Water Depth,if Offshore: 20.Thickness of Permafrost MD/TVD: (Submit electronic and printed information per 20 AAC 25.050) na (Ii:MSL) 1652'MD/1624'TVD 21.Logs Obtained(List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-drill/Lateral Top Window MD/TVD none not applicable 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CEMENTING RECORD CASING SIZE WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE PULLED 16" 65# H-40 38' 106' 38' 106' 24" 212 sx CS II 10.75" 45.5# J-55 37' 2351' 37' 2206' 13.5" 930 sx AS III,250 sx AS I 7" 26# J-55 37' 8188' 37' 6901' 8.5" 610 sx Class G,250 sx AS I 24.Open to production or injection? Yes ❑ No ❑✓ If Yes,list each 25. TUBING RECORD Interval open(MD+TVD of Top&Bottom;Perforation Size and Number): SIZE DEPTH SET(MD) PACKER SET(MD/TVD) 3.5" 7366' 7258'MD/6124'TVD, and 7540'-7590'MD 6355'-6397'TVD 7402'MD/6241'TVD,7813'MD/6583'TVD 7676'-7722'MD 6469'-6507'TVD26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 7945'-7950'MD 6694'-6698'TVD Was hydraulic fracturing used during completion? Yes❑ No❑ 7960'-7982'MD 6706-6725'TVD 1 '5`2371., DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED l none 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,gas lift,etc.) plugged Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO Test Period--> Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API(corr) Press. 24-Hour Rate-> 28. CORE DATA Conventional Core(s)Acquired? Yes ❑ No ❑ Sidewall Cores Acquired? Yes ❑ No ❑✓ If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (Submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. NONE same DEC 1 4 2015 Form 10-407 i seJ.0/2012 v rL CONTINUED ON REVERSE \ Submit original only , Or Ill'L`r�.J i `I / /z /1 5- "`-- RBDMS APR - 9 2015 �C 29. GEOLOGIC MARKERS(List all formations and mrs encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes Q No If yes,list intervals and formations tested, Permafrost-Top ground surface ground surface briefly summarizing test results. Attach separate sheets to this form,if Permafrost-Bottom 1652' 1624' needed,and submit detailed test information per 20 AAC 25.071. Top Upper Sand 7484' 6308' Base Upper Sand 7720' 6504' Top Lower Sand 7936' 6685' Base Lower Sand 8069' 6799' N/A Formation at total depth: Kuparuk • 31. LIST OF ATTACHMENTS Summary of Daily Operations,schematic 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Theresa Lee @ 263-4837 T4expix", Frej2_, Email: Theresa.M.Lee@ conocophillips.com Printed Name Brett Packers Title: Supervising Workover Engineer G/ pl Signature -�k' Phone 265-6845 Date /�j( INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1a: Classification of Service wells: Gas injection,water injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection,Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13:The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20:Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 28. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,showing the data pertinent to such interval). Item 26: Method of Operation: Flowing,Gas Lift, Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other (explain). Item 27:Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 29: Provide a list of intervals tested and the corresponding formation,and a brief summary of this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 KUP PROD • 1G-11 ConocoPhillips ri. Well Attributes Max Angle&MD TD Alasl a 1110 Wellbore API/UWI Field Name Wellbore Status ncl 7) MD(ftKB) Act Btm(BBB) rr+pr. 500292100800 KUPARUK RIVER UNIT PROD 41.68 4,900.00 8,208.0 --- Comment Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date 1G-11,3/30/201511,10.04 AM SSSV:NONE 100 12/16/2013 Last WO: 3/15/2015 40.99 9/19/1983 Vertical schematic(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date -- --- ( ------Last Tag:SLM 7,946.0 6/10/2014 Rev Reason:WORKOVER smsmith 2/4/2014 HANGER;31.2 1 Casing Strings Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TOO)...Wt/Len(I...Grade Top Thread ICONDUCTOR 16 15.250 38.0 106.0 106.0 65.00 H-40 WELDED Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(I...Grade Top Thread SURFACE 10 3/4 9.950 37.0 2,351.3 2,206.1 45.50 J-55 BTC '' • '''' '' ' m "I'aWr Casing Description I J. OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)...Wt/Len(I...Grade Top Thread PRODUCTION 7 6.276 37.1 8,187.7 6,900.9 26.00 J-55 BUTT Tubing Strings CONDUCTOR;30.0-106.0 . Tubing Description String Ma...'ID(in) 'Top(ftKB) 'Set Depth(ft..'Set Depth(TVD)(...1V0(Ib/ft) 'Grade 'Top Connection TUBING-WO 3 1/2 2.992 31 2 7,366.3 6.211.7 9.30 L-80 EUE8rd mod Completion Details Nominal ID SURFACE;37.1-2,351.3- a Top(ftKB) Top(TVD)(ftKB) Top Incl(") Item Des Com (in) 31.2 31.2 0.10 HANGER CIW TUBING HANGER 2.992 [ 7,227.5 6,098.8 35.87 LOCATOR LOCATOR SUB 2.990 GAS LIFT;2,726.2 'C 7,228.5 6,099.6 35.87 SEAL ASSY BAKER 80-40 SEAL ASSEMBLY 2.990 I 7,235.8 6,105.5 35.85 PBR BAKER 80-40 PBR 4.000 C 7,258.3 6,123.8 35.81 PACKER BAKER FHL RETRIEVALBE PACKER 2.910 G GAS LIFT;4,148.1 4i 7,311.1 6,166.7 35.63 NIPPLE CAMCO DS NIPPLE W/RHC INSTALLED 2.812 7,359.8 6,206.3 35.23 OVERSHOT POOR BOY TUBING OVERSHOT 3.750 -- Tubing Description 'String Ma...'ID(in) 'Top(ftKB) 'Set Depth(ft..J Set Depth(TVD)(...1Wt(Ib/ft) 'Grade 'Top Connection TUBING-ORIGINAL 41/2 2.992 7,361.3 7,84121 6,6062 9.20 J-55 FL4S GAS LIFT;5,320.5 Completion Details Nominal ID _ Top(ftKB) Top(ND)(ftKB) Top Incl I") Item Des Com (in) 7,376.2 6,219.7 35.10 SBR OTIS SBR(2.81"X NIPPLE PROFILE) 2.813 GAS LIFT;6,185.3- 7,402.3 6,241.2 34.87 PACKER OTIS RRH PACKER 2.970 7,541.7 6,356.6 33.56 BLAST RINGS BLAST RINGS(3) 2.992 GAS LIFT:6,832.4 7,657.2 6,452.9 33.74 BLAST RINGS BLAST RINGS(3) 2.992 7,812.7 6,582.3 33.28 LOCATOR OTIS LOCATOR 2.992 7,813.1 6,582.6 33.28 PACKER OTIS WD PACKER 4.000 GAS LIFT;7,171.4 7,816.5 6,585.4 33.25 MILLOUT OTIS MILL OUT EXTENSION 4.410 I7,830.8 6,597.4 33.15 NIPPLE CAMCO D NIPPLE NO GO 2.750 I 7,840.4 6,605.5 33.09 WLEG OTIS WIRLINE RE-ENTRY GUIDE,ELMD TTL @ 7822 3.015 during PPROF on 9/27/2007 LOCATOR;7,227.5 SEAL ASSY;7,228.5 Perforations&Slots PER;7,235.8 Shot PACKER;7,258.3 (444 Dens Top(ND) Btm(TVD) Dens Top(ftKB) Btm(ftKB) (ftKB) (ftKB) Zone Date t) Type Com 7,540.0 7,590.0 6,355.2 6,396.9 C-4,1G-11 12/23/1983 12.0 IPERF 120 deg Phasing;5" IIIIDresser Atlas NIPPLE;7,311.1 7,676.0- 7,722.0 6,468.5 6,506.7 C-1,1G-11 12/23/1983 12.0 IPERF 120 deg Phasing;5" 1111 Dresser Atlas 7,945.0 7,950.0 6,693.5 6,697.7'A-5,1G-11 3/30/1984 4.0 APERF 90 deg Phasing;RigidJet OVERSHOT;7,359.8 I` . 7,960.0 7,980.0 6,706.2 6,723.2 A-4,1G-11 11/26/1993 4.0 APERF 180 deg.Phasing;163 CCW orientation;2 5/8" it Titan HC mrw SBR;7,3762 7,980.0 7,982.0 6,723.2 6,724.9 A-4,10-11 3/30/1984 4.0 APERF 90 deg Phasing;RigidJet PACKER;7,402.3 _ Mandrel Inserts PRODUCTION;7,437.7 ,-- St ati PRODUCTION;7,504.8 _ Top(TVD) Valve Latch Port Sire TRO Run N Top(ftKB) (ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date Corn 1' 2,726.2 2,522.7 CAMCO MMG 1 1/2 GAS LIFT -DMY RK 0.000 0.0 3/23/2015 - 2 4,148.1 3,673.7 CAMCO MMG 1 1/2 GAS LIFT DMY RK 0.000 0.0 3/23/2015 IPERF;7,540.0-7,590.0-- . _, 3 5,320.5 4,582.8 CAMCO MMG 11/2 GAS LIFT DMY RK 0.000 0.0 3/23/2015 4 6,185.3 5,260.1 CAMCO MMG 1 1/2 GAS LIFT SOV RKP 0.000 0.0 3/23/2015 DCR1 5 6,832.4 5,780.0 CAMCO MMG 1 1/2 GAS LIFT DMY RK 0.000 0.0 3/23/2015 - 6 7,171.4 6,053,4 CAMCO MMG 1 1/2 GAS LIFT DMY RK 0.000 0.0 3/23/2015 (PERF;7,676.0-7,722.0 A _ 7 7,437.7 6,270.2 OTIS SPM 1 PROD CV BEK 0.000 0.0 6/14/2001 8 7,504.8 6,325.9 OTIS SPM 1 PROD CV BEK 0.000 0.0 6/14/2001 E. 9 7,775.2 6,551.0 OTIS SPM 1 PROD CV BEK 0.000 0.0 6/13/2001 Notes:General&Safety PRODUCTION;7,775.2 _ End Date Annotation 1/20/2004 NOTE:WAIVERED WELL:IA x OA COMMUNICATION LOCATOR;7,812.7 . 9/16/2010 NOTE:View Schematic w/Alaska Schematic9.0 PACKER;7,813.1 MILLOUT;7,816.5 i`. NIPPLE;7,830.8 1 WLEG;7,840.4 APERF;7,945.0-7,950.0- APERF;7,980.0-7,980P- ..._ APERF;7,980.0-7,982.0- 4-- PRODUCTION; ,980.0.7,980.0- APERF;7,980.0-7,982.0- PRODUCTION;37.1.8,187.7 1G-11 PRE-RIG WELL WORK DATE SUMMARY 12/19/2014 (PRE-RWO) FUNCTION TEST LDS ALL OK, T POT PASSED, T PPPOT PASSED, IC POT FAILED, MITOA PASSED TO 1800 PSI. 1/11/2015 BRUSH 'N FLUSHED TBG & GLMs DOWN TO PATCH @ 7359' RKB. IN PROGRESS. 1/12/2015 SET CATCHER @ 7359' RKB; PULLED GLVs @ 4941', 3703' &2030' RKB & SET DVs. PULLED OV @ 5754' RKB & LEFT POCKET OPEN TO LOAD IA. IN PROGRESS. 1/13/2015 LOAD IA W/ INHIB SEAWATER W/DIESEL FREEZE PROTECT; SET DV @ 5754' RKB; PULL CATCHER @ 7359' RKB. IN PROGRESS (LRS ON LOCATION MITIA). 1/14/2015 JARRED ON PATCH FOR 4 HRS WITH NO MOVEMENT. IN PROGRESS. 1/15/2015 JARRED ON PATCH USING .160 WIRE FOR 1.5 HOURS W/ NO MOVEMENT; DEPLOYED CATCHER &ATTEMPT TO PULL DV @ 7340' (RECOVERED 5"X 1" METAL IN KOT/ SIMILAR TO NOSE OF E-LINE TOOL--SEE ATTACHMENTS). IN PROGRESS. 1/20/2015 PULLED DV @ 6849' RKB, PULLED CATCHER. READY FOR CTU. 1/26/2015 TEST BOP, PASSED, SHUT DOWN FOR PHASE 2 WEATHER 1/29/2015 B&C CTU#1: CLEAR SNOW AFTER PHASE CONDITIONS, STACK DOWN INJECTOR AND CLEAR. CUT CONNECTOR AND FIND SLUSHY DIESEL. GO TO WELL AND CIRC COIL VOLUME TO TANKS. MAKE UP FISHING BHA AND TEST. WILL RETURN IN THE MORNING TO FISH PATCH. 1/30/2015 B&C CTU#1: ATTEMPT TO FISH PATCH FROM 7359'WITH BAKER G-FORCE JARS, WT BAR (3), AND ACCELERATOR. HIT TOTAL OF 15 JAR LICKS WORKING UP TO MAX 25K# OVER. RELEASE GS AND PULL OUT TO CUT PIPE FOR PIPE LIFE MANAGEMENT. ON SURFACE, RIG BACK AND SHUT DOWN FOR PHASE 2 WEATHER. IN PROGRESS. 2/1/2015 B&C CTU #1: CLEAR SNOW FROM UNIT AFTER BLOW AND CUT 200' OF COIL. ATTEMPT TO FISH TUBING PATCH FROM 7359'WITH BOWEN JARS, WT BAR (3), AND ACCELERATOR. TOTAL OF 25 JAR LICKS AT MAX 22K#OVER. RELEASE FROM GS AND POOH DUE TO B&C COIL LIFE REQUIREMENTS. RIG OFF WELL. PLAN FORWARD TO BE DISCUSSED. 2/9/2015 FIRED 8' STRING SHOT WITH 160 GR/FT. STRING SHOT INTERVAL WAS 7359' THRU 7367'. 2/10/2015 UNABLE TO FALL PAST PATCH, DESPITE RUNNING A SLICK TOOL STRING. DECISION MADE TO FIRE SECOND STRING SHOT AT THE TOP OF THE PATCH SIMILAR TO THE FIRST. FIRST STRING SHOT INTERVAL OF 7359 THRU 7367'. STRING SHOT LENGTH = 8' WITH 160 GR/FT. FIRED AT A CCL STOP DEPTH OF 7356.5'. 2/24/2015 LOG 30 MIN STATION STOP @ 7300' RKB, TEMP/PRES = 153degf/2644#, LOG 30 MIN STATION STOP @ 7177' RKB, TEMP/PRES = 150degf/2600#, SHOOT 8' STRINGSHOT FROM 7341'- 7349' RKB. ****BACKOFF BAR LEFT IN HOLE, THREADS THAT SCREW INTO DETO HOUSING LOOKING UP ON FISH***** JOB IN PROGRESS. 2/25/2015 RECOVER FISH @ 7310' SLM, CUT TBG © 7345' RKB. COMPLETE. CALL FOR BPV • ConocoPhillips Time Log & Summary Wel"view Web Reporting Report Well Name: 1G-11 Rig Name: NABORS 7ES Job Type: RECOMPLETION Rig Accept: 3/15/2015 7:00:00 PM Rig Release: 3/24/2015 12:00:00 AM Time Logs Date From To Dur S. Depth E.<Depth Phase -Code Subcode T Comment 03/15/2015 24 hr Summary RDMO 1G-12. Hang tree in cellar. MIRU on 1G-11. Spot pits and auxiliary equipment. Hook up lines. Berm up rig. Rig accepted at 19:00 hrs. Take on seawater. Install secondary annulus valve. Rig up to kill well. Lubricate out BPV. Shut in pressures-Tubing 100 psi, IA 200 psi, OA 600 psi. "Rig accepted at 19:00 00:00 02:00 2.00 MIRU MOVE RURD P Blow down steam. Remove berming around rig. Prep for rig move. 02:00 03:30 1.50 MIRU MOVE MOB P PJSM with Peak. Pull pits away from Sub-base. 03:30 06:00 2.50 MIRU MOVE MOB P Raise cellar doors. Jack up rig. Remove mats from under rig. Back off 1G-12. 06:00 10:00 4.00 MIRU MOVE MOB P Set mats around 1-G-11. Hang tree in cellar. Spot sub base over well. 10:00 12:00 2.00 MIRU MOVE RGRP T Observe crack in flowline. Change out flowline 12:00 15:30 3.50 MIRU MOVE MOB P Back in and spot pit module. Spt cuttings tank, and parts house. 15:30 19:00 3.50 MIRU MOVE RURD P Berm up rig. Hook up electrical, steam and water. Hook up mud lines. Inspect drawworks clutch. *Rig accepted at 19:00 19:00 22:00 3.00 MIRU WELCTL RURD P Take on seawater. Install secondary valve on annulus. Rig up hoses to tree and tiger tank. 22:00 00:00 2.00 MIRU WELCTL MPSP P M/U lubricator and test to 2000 psi. Lubricate out BPV. Pressures Tubing -100 psi IA- 200 psi OA-600 psi 03/16/2015 Rig up and kill well with 8.6 ppg seawater. 500 bbls pumped with 180 bbls returned. Monitor well. Install BPV. Nipple down tree. Nipple up BOPE. Test BOPE 250/3000 psi. States right to witness BOPE waived by Bob Noble. Accumulator test:starting pressure 3000 psi, final 1700 psi. First 200 psi recharge 18 seconds,full recharge 94 seconds. Five nitrogen bottles at 2000 psi. Daily Losses: 249 bbl 00:00 01:00 1.00 MIRU WELCTL RURD P PJSM. R/U and blow air through hardline to ensure clear. PT hardline to 2500 psi. Page 1 of 10 • Time Logs • • Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 01:00 05:30 4.50 MIRU WELCTL KLWL P Bleed gas cap from tubing. SITP 80 psi. Hold casing pressure at 300 psi while bringing pumps up to rate, 2.5 bpm. Circulating pressure 270 psi. Kill well holding constant circulating pressure, 360 psi on IA. Pump 300 bbls with minimal returns. Shut down and monitor pressures: 15 psi on tubing 300 on IA. Bring pumps online at 2 bpm with 50 psi and pump additional 60 bbls holding 200 psi back pressure. Shut down and monitor pressures: IA 220 psi. Continue circulating until 8.6 ppg fluid seen at surface. 500 bbls pumped with FCP 220 psi. Final volume figures...pumped 505 bbls...returns—180 bbls. 05:30 07:30 2.00 MIRU WELCTL OWFF P Monitor well. Tubing on vacuum, Very slight breathing observed from the IA. Shut in IA, no pressure build up. Continue to monitor Well. Tubing dead, IA continue with very slight breathing with no pressure build-up. R/D circulating hoses, Blow down lines. 07:30 08:00 0.50 MIRU WHDBO MPSP P Set Back Pressure Valve. 08:00 12:00 4.00 MIRU WHDBO NUND P Nipple down Tree. Inspect Tubing Hanger Threads(11 1/2 turns. Function all lock-down pins. Install Test Dart. (SIMOPS...continue to load Pipe Shed with Drill Pipe). 12:00 16:30 4.50 MIRU WHDBO NUND P Nipple up BOP Stack with 2 7/8"x 5" Pipe Rams in both Gates. Install Riser. Rig up test equipment. 16:30, 18:00 1.50 MIRU WHDBO BOPE P Shell test BOPE. Tighten DSA 11" side, block valve on choke manifold. Page 2of10 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 18:00 00:00 6.00 MIRU WHDBO BOPE P Perform the initial BOPE test as per ConocoPhillips/AOGCC requirements at 250/3,000 psi . 2-7/8"x 5"VBR's in both cavities. The State's right to witness the test was waived by AOGCC Field Inspector, B. Noble. 1) Blind rams; rig floor kill; outer test spool; IBOP; Chokes 1, 2, 3, 16- pass. 2) Blind rams; HCR kill; inner test spool valve; manual IBOP; Chokes 4, 5, 6-pass 3) Blind rams; manual kill; inner test spool valve; HT38 dart; Chokes 7,8,9 -pass 4)Super choke and manual bean choke 5) Blind rams; Manual kill; Inner test spool; HT38 TIW; Chokes 10, 11 -pass 6) Blind rams; Manual kill; Chokes 12, 13, 15-pass 7)Annular with 3-1/2"Test joint; manual kill; 8rd TIW; Choke 14 8) Upper pipe rams with 3-1/2"test joint; Choke HCR; manual kill; 8rd TIW 9) Upper pipe rams with 3-1/2"test joint; manual choke; manual kill; 8rd TIW 10)lower pipe rams with 3-1/2"test joint; 8rd TIW Accumulater test: Starting pressure 3000 psi, final 1700 psi. First 200 psi recharge 18 seconds, full recharge 94 seconds. 5 Nitrogen bottles at 2000 psi 03/17/2015 Pull BPV. M/U landing joint, back out lock down screws. Unland hanger. Circulate hole clean. Rig up GBR, rig up Camco spooler. POOH with decompletion. M/U BHA#1 overshot, SIH on Drill Pipe. Daily Losses: 530 bbl 00:00 00:30 0.50 MIRU WHDBO RURD P R/D testing equipment. 00:30 01:00 0.50 MIRU WHDBO MPSP P Rig up and pull BPV. 01:00 02:15 1.25 7,345 COMPZ RPCOM PULL P Make up head pin to landing joint. RIH and Make up to hanger. Back out lock down screws. Pick up on tubing, hanger free at 60K. Work up to max pull of 144K(blocks 30K). Work pipe from 100K to 140K- calculate stretch factor. Establish circulation to attempt and fill the hole. Stage pumps up to 6bpm 800 psi. Observe weight fall off to 80K. Page 3 of 10 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 02:15 03:00 0.75 7,345 7,345 COMPZ RPCOM CIRC P Stage pumps up to 10 bpm 2000 psi and attempt to clean hole. Obtain returns after 50 bbls; Observe diesel returns mixed with brine,dump to cuttings tank. Slow pumps down to 2 bpm to attempt and separate brine/diesel-lost returns. Stage pumps up to 3 bpm minimal returns. Spot high viscosity pill on bottom to mitigate losses. Simops: Load Camco Spooler, Load _ GBR tongs. 03:00 03:30 0.50 7,345 7,345 COMPZ RPCOM PULL P Pull hanger to the floor. PUW 93K. 03:30 04:30 1.00 7,345 7,345 COMPZ RPCOM RURD P PJSM. Rig up Camco spooler and GBR tongs 04:30 08:00 3.50 7,345 5,400 COMPZ RPCOM PULL P Start to single down with the 3 1/2" GLM Completion to the SSSV. Recovered 34 SS Bands(the expected amount). 08:00 08:30 0.50 5,400 5,400 COMPZ RPCOM RURD P Lay down the SSSV. Rig down the Schlumberger Spooling Unit. 08:30 15:30 7.00 5,400 0 COMPZ RPCOM PULL P Continue to single down the remaining 3 1/2"Completion to the cut-off stub. (present fluid loss=22 bbls/hr). Recovered 242 Jts, 7 GLMs, SSSV and Control Line, 34 SS Bands, 3 1/2"Cut-Off Stub. OAL = 14.04-ft. The Digital S-Line Chemical cut was—75%. Tubing and GLMs looked good...no corrosion, pitting or scale. Threads good. (Note: The tubing body measured 3.62"-3.65"0 D from the cut up—4-ft before the normal 3.5"0 D was measured...I would assume that this was from an aggressive String-Shot charge across the planned cut depth of 7,345-ft). 15:30 16:30 1.00 0 0 COMPZ RPCOM RURD P Rig down GBR tubing handling equipment. Clear and clean Floor 16:30 17:00 0.50 0 0 COMPZ RPCOM SVRG P Top Drive and Derrick inspection. Service Top Drive. 17:00 19:30 2.50 0 305 COMPZ RPCOM BHAH P Pick Up BHA#1, Overshot with grapple for tubing stub, Bumper sub, Jars, Pump out sub, Top sub, 9 Drill Collars.Total Length: 304.71 19:30 20:15 0.75 305 1,060 COMPZ RPCOM PULD P Single in hole with Drill Pipe picked up from pipe shed. 20:15 20:30 0.25 1,060 1,060 COMPZ RPCOM SFTY P Well Control Drill.Well shut in 24 sec,All crew in position 58 sec. 20:30 00:00 3.50 1,060 4,500 COMPZ RPCOM PULD P Continue to Single in hole with Drill Pipe picked up from pipe shed. 03/18/2015 SIH on Drill Pipe. Slip and Cut Drill Line. Engage fish @ 7342'dpmd. Engage and fish tubing stub,could not jar fish loose.TOOH and LD BHA#1. PU BHA#2(Tubing Patch spear). RIH and fish Tubing Patch. TOOH with BHA#2 and Fish. Circulate BU. Daily Losses: 1490 bbl Page 4 of 10 Time Logs • Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 00:00 01:30 1.50 4,500 7,024 COMPZ RPCOM PULD P Continue to Single in hole with Drill Pipe picked up from pipe shed to 7024'. 01:30 01:45 0.25 7,024 7,024 COMPZ RPCOM SFTY P PJSM Slip and Cut Drill Line 01:45 03:30 1.75 7,024 7,024 COMPZ RPCOM SLPC P Slip and Cut 84'of Drill Line. 03:30 04:00 0.50 7,024 7,024 COMPZ RPCOM SVRG P Service Rig: Service Drawworks and iron roughneck. Perform daily top drive inspection 04:00 04:45 0.75 7,024 7,342 COMPZ RPCOM PULD P Establish parameters: Up wt= 155k, Dn Wt= 105k, Rot wt= 125k, Free Tq 7k @ 15 rpm. Single in hole with drill pipe to 7342'dpmd where top of cut joint located. 04:45 10:45 6.00 7,342 7,342 COMPZ RPCOM JAR P Once top of fish located engage fish. Work grapple down over top of fish @ 7342'dpmd. Fish swallowed 1.5'with —35k down wt. Begin working with Jars. 35k overpull and 40k straight pull X5.40k overpull and 40k straight pull. Increase Jar cycle and straight pull to 50K/50K. Total Jar cycles= 80 with no sign of progress. Discuss plan forward with Anchorage Engineer.Work with much effort to release Overshot. Finally released Overshot...with much Joy. 10:45 12:30 1.75 7,342 7,340 COMPZ RPCOM CIRC P Circulate a 1.5 x calculated bottoms up. Spot a 40 bbl Hi-Vis Gel Slug on bottom. 12:30 16:30 4.00 7,340 305 COMPZ RPCOM TRIP P Trip out with BHA#1 from 7.340-ft, standing back the 3 1/2" Drill Pipe in the Derrick. Present fluid loss=35 bbls/hr. Up Weight= 155K. 16:30 17:30 1.00 305 0 COMPZ RPCOM BHAH P Lay down BHA#1. 17:30 19:00 1.50 0 366 COMPZ RPCOM BHAH P Make up BHA#2...GS Spear Assembly. 19:00 21:45 2.75 366 7,275 COMPZ RPCOM TRIP P Trip in hole with BHA#2. 21:45 23:00 1.25 7,275 7,336 COMPZ RPCOM FISH P Up Wt= 157k, Dn Wt= 105k. Engage fish. Pull to 15k and see bobble. Pull to 30k over and see jars hit. Pull up and observe movement at up weight. Pull to 25k over and then observe release to up weight.After 26'of travel observe pull to 25k over and then observe release to up weight. Pull clear of cut joint stump and set fish down on it. Indicates string is—32' longer indicating fish on.Turn off hole fill and observe hole continue to take fluid. Drop Pump out sib dart and open pump out sub @ 2500 psi. SPRs taken. Set back down to ensure fish still on, observe set down @—32' high indicating fish still on. Page 5 of 10 •Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 23:00 00:00 1.00 7,336 7,336 COMPZ RPCOM CIRC P Circulate BU at 4 bpm 485 psi. X3/19/2015 Continue to Circulate BU.TOOH and LD BHA#2 and Fish. PU and RIH BHA#3(3.5" Dress Off/7"Drift). Dress off Cut joint.TOOH to—1750'and hang off string beneath Storm Packer @—470'. Nipple Down BOP Stack. Daily Losses: 670 bbl 00:00 01:00 1.00 7,336 7,336 COMPZ RPCOM CIRC P Continue to Circulate BU. Pump 40 bbl Hi Viscosity pill, spot at bottom of hole. 01:00 04:15 3.25 7,336 392 COMPZ RPCOM TRIP P Confirm Fish still on by setting down weight in same spot. Up wt= 157k, Dn Wt= 105k. Trip out of hole. 04:15 06:15 2.00 392 0 COMPZ RPCOM BHAH P Lay Down BHA#2. Recovered complete patch. Clear and clean Floor. 06:15 06:45 0.50 0 0 COMPZ WELLPF SVRG P Inspect and service the Top Drive. 06:45 08:00 1.25 0 338 COMPZ WELLPF BHAH P Make-up BHA#3 as follows: 6"x 3 9/16" Dress-Off Shoe, Extension,XO Bushing, 5 3/4"Overshot(no grapple), Top Sub,XO, 2 ea Boot Baskets, Bit sub,6"Smooth OD Stabilizer, Magnet, Bumper sub, Oil Jar,9 ea 4 3/4"Drill Collars,XO. 08:00 10:00 2.00 338 5,070 COMPZ WELLPF TRIP P Trip in with BHA#3 with 3 1/2"Drill Pipe from the Derrick to 5,070-ft. 10:00 10:15 0.25 5,070 5,070 COMPZ WELLPF SFTY P BOP Drill. Well secured in 32 seconds...all Crew in position in 55 seconds. 10:15 11:15 1.00 5,070 7,342 COMPZ WELLPF TRIP P Continue tripping in with BHA#3. Up weight= 100K. Down weight=80K. to 7,342-ft...top of the 3 1/2"cut-off tubing stump. 11:15 12:15 1.00 7,342 7,354 COMPZ WELLPF MILL P Establish parameters as follows: Up weight= 155K...down weight= 105K, RPMs=60, rotating weight= 130K,free spin torque=7-7.5 K, pump rate=4.0 bpm/530 psi. Tagged the top of the Tubing Stump at 7,342-ft dpmd. Dress 4-ft on the outside of the Tubing Stump that was swelled due to the string shot at 8,500K ft/lbs torque. Torques fell off. continue to swallow stump to No-Go (12-ft swallow). Pull off of stump. Shut down rotation. Slide over and swallow stump with no problems. 12:15 14:00 1.75 7,342 7,342 COMPZ WELLPF CIRC P Pump a 20 bbl HI-Vis swep. Chase back to surface with Sea Water at 5.0 bpm/735 psi. Pump a spot a Hi-Vis Pill on bottom. 14:00 19:30 5.50 7,342 1,750 COMPZ WELLPF PULD P Start out with BHA#3. Single down 3 1/2"Drill Pipe to the Pipe Shed.. 19:30 19:45 0.25 1,750 1,750 COMPZ WELLPF SFTY P PJSM, Pick Up and Set Storm Valve. 19:45 20:30 0.75 1,750 2,220 COMPZ WELLPF TRIP P Trip in hole 5 stands with Storm Valve. 20:30 21:00 0.50 2,220 2,220 COMPZ WELLPF MPSP P Hang off 1750'of string beneath Storm Valve at 470'. Page 6 of 10 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 21:00 22:30 1.50 2,220 2,220 COMPZ WELLPF TRIP T Trip out of hole:After Storm valve was set Baker Rep observed indication of possible equalization screw shearing while getting off of storm valve. Consult Baker Supervisor. Release Storm Valve and retrieve. Pull back to surface and repin for setting and Trip back in to _set. 22:30 23:00 0.50 2,220 2,220 COMPZ WELLPF MPSP T Hang off Storm Valve at 470'and successfully get off without indications of sheared equalization _valve pins. 23:00 23:15 0.25 2,220 2,220 COMPZ WELLPF TRIP P Trip out of hole with running tool. 23:15 23:30 0.25 2,220 2,220 COMPZ WELLPF MPSP P Test to 1000 psi for 5 min. Charted. 23:30 00:00 0.50 2,220 2,220 COMPZ WELLPF NUND P Nipple Down BOP Stack. 03/20/2015 Nipple Down Tubing Head. Grow 7"casing 15.5". Replace Packoff. Nipple Up new Tubing Head. Nipple Up BOP stack.Test Break. Release Storm Packer. POOH and LD Storm Packer, Drill Pipe and BHA#3. PU and RIH with 3.5"completion. 00:00 01:00 1.00 2,220 2,220 COMPZ WELLPF NUND P Continue Nipple Down BOP Stack and DSA. 01:00 05:30 4.50 2,220 2,220 COMPZ WELLPF WWSP P Grow Casing with Hydratight to replace packoff Casing grew 15.5" and initial pressure was 10k. Pull old packoff. Replace with new packoff. Use Hydratight to squeeze 7"back down to set packoff and to Run in Lock Down Screws. 05:30 07:30 2.00 2,220 2,220 COMPZ WELLPF NUND P Nipple Up New Tubing Head. 07:30 08:00 0.50 2,220 2,220 COMPZ WELLPF PRTS P Pressure test Pack-off at 250 psi x 5 minutes/2,500 psi x 10 minutes. Good. Install Test Plug. 08:00 11:00 3.00 2,220 2,220 COMPZ WELLPF NUND P Nipple Up Dual Stud Adapter and the BOP Stack. 11:00 11:30 0.50 2,220 2,220 COMPZ WELLPF PRTS P Test BOP body breaks at 250 psi/3,000 psi x 5 minutes each. Good. Record on chart. PUII test plug. Install wear Bushing(6 3/8" id). 11:30 12:15 0.75 2,220 2,220 COMPZ WELLPF TRIP P Make up and trip in with the Retrieving Tool to 470-ft dpmd. 12:15 13:00 0.75 2,220 2,220 COMPZ WELLPF MPSP P Open equalizer valve. Monitor. Release Storm Packer. 13:00 14:00 1.00 2,220 2,220 COMPZ WELLPF CIRC P Fill hole and monitor fluid loss at 64 bbls/hr. 14:00 16:00 2.00 2,220 338 COMPZ WELLPF PULD P Single down 3 1/2"Drill Pipe to the Storm Packer. Lay down the Retrieving Tool and the Storm Packer. 16:00 17:30 1.50 338 0 COMPZ WELLPF BHAH P Lay Down BHA#3. Page 7 of 10 Time Logs Date From To Dur S. Depth E. Death Phase Code Subcode T Comment 17:30 20:00 2.50 0 0 COMPZ RPCOM RURD P Pull Wear Ring. Rig Up GBR Tongs. Clean Up Rig Floor. Go over completion in pipe shed and ensure running order and all tubing and jewelry checked. 20:00 20:30 0.50 0 0 COMPZ RPCOM SFTY P PJSM for running completion. 20:30 00:00 3.50 0 2,150 COMPZ RPCOM PUTB P Run 3.5"completion per design. 33/21/2015 RIH with 3.5"completion. Could not locate overshot over cut joint. Call out Slickline, RU and pull RHC plug body. RD Slickline. RU E-Line and log completion, confirms overshot not over cut joint. Rig Down E-Line. 00:00 03:30 3.50 2,150 5,000 COMPZ RPCOM PUTB P Continue to run 3.5"completion per design. 03:30 03:45 0.25 5,000 5,000 COMPZ RPCOM SFTY P Well Control Drill.Well shut in 25 sec.All crew in place 59 sec.AAR with crew after. 03:45 08:30 4.75 5,000 7,342 COMPZ RPCOM PUTB P Continue to run 3.5"completion per design to 7,300-ft. Tag the top of the 3 1/2"Cut-off Attempt to swallow the 3 1/2"Tubing Stump at 7,342-ft with the Poor-Boy Overshot. Unable establish the proper signs(more than one sign)that the No-Go tag is actually a complete swallow No-Go tag. No-Go tag to the expected tally No-Go tag is also—5-ft high. Unable to confirm with pump pressure due to the Well drinking fluid as fast as we are pumping. Discuss the need to call out E-Line to confirm depth with Anchorage Engineer. 08:30 10:45 2.25 7,342 7,342 COMPZ RPCOM WAIT T Call out HES S-line to pull the RHC Plug...Call out HES E-Line Unit to run a CCL Log for depth correlation. (wait on S-Line to finish the job they are rigged up on). 10:45 11:15 0.50 7,342 7,342 COMPZ RPCOM SVRG P Service Rig. Daily Top Drive Inspection and service. 11:15 14:45 3.50 7,342 7,342 COMPZ RPCOM WAIT T Continue to wait on S-Line to finish the job they are rigged up on. 14:45 20:30 5.75 7,342 7,342 COMPZ RPCOM SLKL T Spot Slickline Unit. Rig Up Slickline. RIH and pull RHC sleeve with Slickline. POOH and Rig Down Slickline. 20:30 00:00 3.50 7,342 7,342 COMPZ RPCOM ELOG T Spot E-Line Unit. Rig Up E-Line. RIH and Log with collar locator. Log using CCL(collar locator)are that the top of the 14'cut joint is not inside poorboy overshot. COntact CPAI Engineer and Baker Hughes. Decision to trip completion out of hole made. 03/22/2015 TOOH with 3.5"completion.Wait on New Overshot.TIH with 3.5"completion. 00:00 01:00 1.00 7,342 7,342 COMPZ RPCOM ELOG T Rig Down E-Line Unit and release. (SIMOPS: PJSM for tripping completion and lay down of jewelry with crew.) Page 8 of 10 • Time Logs • Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 01:00 08:30 7.50 7,342 0 COMPZ RPCOM TRIP T Trip out of hole standing back tubing in derrick.As jewelry presents itself lay down into pipe shed. 08:30 18:30 10.00 0 0 COMPZ RPCOM WAIT T Take pictures of the inside of the Poorboy Overshot. Discuss plan forward with Anchorage Engineer. Discuss options with Baker Machine Shop as to the fastest way forward to modify or build a new Poorboy Overshot..Have S-Line folks install the RHC Plug Body in the DS Nipple in the Pipe Shed. Wait on new Poorboy Overshot from Baker Machine Shop. (SIMOPS Top Drive inspection, Miscellaneous rig repairs and rig cleaning while waiting). 18:30 00:00 5.50 0 5,069 COMPZ RPCOM TRIP T Trip in hole with 3.5"completion and tubing from derrick placing jewelry in string per design. 03/23/2015 Continue to TIH with 3.5"completion. Pump CI Seawater. Set Packer. Shear of Seal Assembly. Space out and hang off completion.Test tubing. SOV sheared so test to 3000 psi is combo test. Set BPV. Nipple Down BOPE. Nipple Up Tree.Test Tree. Pull BPV. Freeze Protect. Set BPV. RDMO. 0 psi Tbg/IA/OA RIG RELEASED @ 00:00 3/24/2015 00:00 02:30 2.50 '5,069 7,340 COMPZ RPCOM TRIP T Continue to Trip in hole with 3.5" completion from derrick. Make up circulating equipment on joint 230. Observe screws shear as overshot swallows top of cut joint. Pull off of stub to position for circulating in Corrosion inhibited seawater. 02:30 04:30 2.00 7,340 7,340 COMPZ RPCOM CRIH P Reverse circulate corrosion inhibited seawater©3bpm 210 psi. 250 bbls pumped. 04:30 05:15 0.75 7,340 7,347 COMPZ RPCOM PACK P Drop ball and rod. allow time to fall. Set Overshot 1'off of fully located on cut joint. Set Packer per Baker Representative by pressuring up tubing to 2600 psi, indications of set © 1800 psi. Hold 2600 psi on tubing and test IA to 1500 psi for 5 min to test Packer.All charted. 05:15 06:30 1.25 7,347 7,347 COMPZ RPCOM HOSO P Shear out seals from PBR. Fully locate and calculate Space out. Lay down 2 joints put space out pups (4.23', 8.18', 10.16')in string below 1st full joint. 06:30 07:15 0.75 7,347 0 COMPZ RPCOM THGR P PU landing joint and land hanger and RILDS. Page 9 of 10 1 •Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 07:15 09:00 1.75 0 0 COMPZ RPCOM PRTS P Pressure test the Tubing at 3,000 psi x 10 minutes. Good. Bleed the Tubing down to 1,500 psi and block in. Open IA in preparation to test the Casing...pressure went to"0" ...not expected. Double check valve alignment...correct. Bring Pump on line down the Tubing. Full returns from the IA. It appears the SOV was sheared open during shearing the Seal Assembly free from the PBR. The 3,000 psi test was actually a Tbg/IA combo test. The OA was open and monitored at"0"psi before and during the test. Closed in the Tubing and pumped down the !A to 2,500 psi x 30 minutes...again a Tbg/Csg combo test. Monitored the OAP at"0"psi again. All test recorded on chart. Discussed results with Anchorage Engineers. Tests accepted. Monitor Well, static. 09:00 09:30 0.50 0 0 COMPZ WHDBO MPSP P Set BPV. (SIMOPS rig down GBR equipment). 09:30 10:15 0.75 0 0 COMPZ WHDBO MPSP P Pressure test the BPV from below at 1,000 psi x 10 minutes. Record on chart. Rig down test equipment. Blow down lines. 10:15 12:15 2.00 0 0 COMPZ WHDBO NUND P Blow down all remaining lines. Nipple down BOP Stack and set back on the stump. Install Test Dart. 12:15 14:15 2.00 0 0 COMPZ WHDBO NUND P Nipple up the Production Tree. 14:15 15:30 1.25 0 0 COMPZ WHDBO NUND P Remove the 3-Way Tee and install a 4-way Cross on the Tree. 15:30 16:00 0.50 0 0 COMPZ WHDBO PRTS P Test the Hanger void at 250 psi x 5 minutes and at 5,000 psi x 10 minutes. Good. 16:00 16:30 0.50 0 0 COMPZ WHDBO PRTS P Pressure test Tree at 250/5,000 psi. Good. 16:30 17:00 0.50 0 0 COMPZ WHDBO FRZP P Rig Up Little Red for Freeze Protect. Rig Up lines to take returns to cuttings bin. 17:00 20:00 3.00 0 0 COMPZ WHDBO FRZP P Freeze protect well. Pump 73 bbls down backside.Allow jumper hoses to U-Tube. 20:00 20:30 0.50 0 0 COMPZ WHDBO FRZP P Rig Down Little Red.Take pressures. 0 psi on tubing, IA and OA. 20:30 21:00 0.50 0 0 COMPZ WHDBO MPSP P Set BPV and test from below. 21:00 00:00 3.00 0 0 DEMOB MOVE RURD P Complete cleaning pits. Blowing down lines. Ready rig to be moved to 1G-05. RIG RELEASED @ 00:00 � �.�..�. Page 10 of 10 1...._ . 25453 WELL LOG TRANSMITTAL DATA LOGGED rj/5/201 iL K.BEND R To: Alaska Oil and Gas Conservation Comm. March 31, 2015 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RECEIVED APR 0 3 2015 RE: Correlation Log: 1G-11 Run Date: 3/21/2015 AOGCC The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com 1G-11 Digital Data in LAS format, Digital Log Image file 1 CD Rom 50-029-21008-00 SCANNED IViti. 0 6 20 5 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed: 6.-eifteat Kau Pm IC3I31 Regg, James B (DOA) From: Barr, Kevin <Kevin.Barr@nabors.com> l Sent: Tuesday, March 17, 2015 7:52 AM �� 3 To: Regg,James B (DOA); DOA AOGCC Prudhoe Bay; Bros, ebe L (DOA) Cc: Tom.D.Rawlins@conocophillips.com; n2364@conocopokhillips.c(Phoom;t7 guy.d.whitlock@contractor.conocophillips.com; larry.g.hill@contractor.conocophillips.com; michael.l.kneale@contractor.conocophillips.com; Michael.s.worthy@conocophillips.com; Rock.D.Rauchenstein@conocophillips.com Subject: Nabors 7ES BOPE 3/16/15 Attachments: Nabors 7ES BOPE 3-16-2015.xls; Nabors 7ES BOPE 3.16.15.pdf Kevin Barr Tool Pusher Nabors Alaska Drilling Rig 7ES Direct(907)6597847 Cell (907)602-0767 iCPNNEO " kevin.barr©nabors.com ******************************* NABORS EMAIL NOTICE-This transmission may be strictly proprietary and confidential. If you are not the intended recipient, reading,disclosing, copying, distributing or using the contents of this transmission is prohibited. If you have received this in error, please reply and notify the sender(only)and delete the message. Unauthorized interception of this e-mail is a violation of federal criminal law. This communication does not reflect an intention by the sender or the sender's principal to conduct a transaction or make any agreement by electronic means.Nothing contained in this message or in any attachment shall satisfy the requirements for a writing,and nothing contained herein shall constitute a contract or electronic signature under the Electronic Signatures in Global and National Commerce Act, any version of the Uniform Electronic Transactions Act, or any other statute governing electronic transactions. 1 • STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report �,�\`4 Submit to: jim.regg(a)alaska qov AOGCC.Inspectorsaalaska.gov phoebe.brooksalaska.qov Contractor: Nabors Rig No • 7ES DATE: 3/16/15 Rig Rep.: Kevin Barr/Paul Yearout Rig Phone: 907-659-7847 Operator: CPAI Op. Phone: 907-659-7844 Rep.: L.Hinkle/C. Montague E-Mail n2364@conocophillips.com Well Name: 1G-11 - PTD# 1831310 Sundry# 315-087 - Operation. Drilling Workover: X - Explor.: Test: Initial: X Weekly: Bi-Weekly: Test Pressure(psi). Rams 250/3000 - Annular: 250/3000 - Valves: 250/3000 MASP: 1906 - MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen. P Well Sign P Upper Kelly 1 P Housekeeping P Rig P Lower Kelly 1 P PTD On Location P - Hazard Sec. P - Ball Type 2 P Standing Order Posted P Misc. NA Inside BOP 1 P FSV Misc 0 NA BOP STACK: Quantity Size/Type Test Result MUD SYSTEM: Visual Alarm Stripper 0 NA Trip Tank P - P Annular Preventer 1 13-5/8 GK P ' Pit Level Indicators P P #1 Rams I 2-7/8 x 5" P Flow Indicator P P #2 Rams 1 Blind Rams P - Meth Gas Detector P P #3 Rams 1 2-7/8"x 5" P - H2S Gas Detector P • P #4 Rams 0 NA MS Misc 0 NA #5 Rams 0 NA #6 Rams 0 NA Quantity Test Result Choke Ln. Valves 1 3 1/8 gate P . Inside Reel valves 0 NA HCR Valves 2 3 1/8 HCR P - Kill Line Valves 2 3 1/8&2" P Check Valve 0 NA ACCUMULATOR SYSTEM: BOP Misc 0 NA Time/Pressure Test Result System Pressure(psi) 3000 • P - CHOKE MANIFOLD: Pressure After Closure(psi) 1700 - P • Quantity Test Result 200 psi Attained(sec) 18 P _ No Valves 16 P - Full Pressure Attained(sec) 94 P Manual Chokes 1 P Blind Switch Covers. All stations Yes - Hydraulic Chokes 1 P Nitgn. Bottles Avg. (#and psi): 5 @ 2000 • P 1 CH Misc 0 NA ACC Misc 0 NA Test Results Number of Failures: 0 Test Time: 5.0 Hours Repair or replacement of equipment will be made within days. Notify the AOGCC of repairs with written confirmation to:AOGCC.Inspectors@alaska.gov Remarks. Tested Annular, Upper&Lower Rams w/3-1/2"test joint, Test(2)-(2-1/16")5m valves on test spool under single gate.Witness of Test by NAD TP Paul Yearout, CPAI REP Clint Montague AOGCC Inspection 24 hr Notice Yes Date/Time 3/14/2015 08:35 Waived By Bob Noble Test Start Date/Time: 3/16/2015 6:30.00 PM (date) (time) Witness Test Finish Date/Time: 3/16/2015 23:59 e U45g kr-cum.u-ta -Nuc ',,,,,1/4.,_ -V'V- - c-,44t, f .P Form 10-424(Revised 06/2014) Nabors 7ES BOPE 3-16-2015.xls 'lE5 B&ETec+ • as m. __ pry i$313t0 • • `. • /•J, • •-- -, �y • ------ �•. \, •-" \ , \ \\`\i\ \�'• •\ `liki 'k \' \ • / , , ,t i 0 , \ \ �',�1 ,j tw 9 4 r r I +'l' l';'''''''"-. �1•'� 'PARir " 0,9\• 4 {.. I ', , i i i f JL o I�, ti-' V �r' ilia` 11 ; • ., . � fr � 11 ! fj { If ' ! II . I ! n< :tea �® + ' 1.� ,1` i\ ,' \ O 5 ; ! HI !;' iii it fi, cri1IL l 4, V\\\ \ t\V ‘ ‘",\ \ - '''-'----1. ''' ///1 , • ;-1.//i''N„, / ii,', ' . S / it X \,\...... \0.\\,..., „...., alIF il *--0•--0 t 00ti. 1' \ J1 /! f • \\\ ' , . ' *-- --.,-).--....` awArwrg, 41 i -t\i'00-,-,_J,V--,A,”- /,/,'" . il, „ 7,// //e// /,' , /// / ,, 1 ......402 '/ ' '.// 1 /i. / `.• 1 ' .�. \ ___..' - .r i� . -' '" •" /.;f' / * - Tom_ - - / i Y- .IN Sp t - lb s les - b�� 4- • 3Itip1(s j...iihs,..-__ ii: 441S4 .--. --4"'"'N N OIO , o 441411414440,4 / °` F J r _ ..,,,_-__.---.-7=,--=-__ ,00e•- O ~` • % / 00 --� i!. O /" - r� Ob C • • �' y, \�\\ ti . \ i • i . 00 • 0005 `. � ..'• 0: : • / Ncl.''..,, \'', . O 00091 , vx \\\:\ . a') . '''`. •* # t 1 ,.yr - ' :t \�p�1'J�DCc,F.' '::: 1601 1` 1 Ili ,. ,,..:,', O g y� 1n S- i jl p O Z \O 10 I ' t 111111 . ----- V • k , — !i i, iii t‘ i r...'.., „4\ _.,::, ii, , ,,s . \' . ., ./44...,:,..44, ,-.. . 0. i \ . . .. 0,- ' ><••' '-'‘ 600 --- V 4,.#4:)10 1,)P6 10 10"tit s' oo .�0401$110 / / 1 d ;':, - -- h 0,p1/ . . ' ----,..,‘, ., .,,,, -------/---_- 0.40411:. , / \ --,, .....,_-.. ----.:,- --- --_±__-. fo,„•.:.„..„ /it;/,/,.////, 0 ,,, IV— 4 111110.111.• " - - lk - ' '' ,3.Of; ---;- ------:----- ----- --5----. 00 -- _�-fr= __`: —=-Y' moi" 0 -� — _ -----:-..--27----,-...-----_,--...- Yom- 404:d4"1"2,./. �/ " -_-- _ -4-,---''- - —moi 0 V' P'" _=. ---/7_-_-_-__,-------------:---- --25------- Wog J 1 -31-310 3-16-15 NABORS 7ES - Well 1G-11 3000 PSI BOP TEST 1) Blind Rams, CMV 1-2-3-16, Rig Floor Kill, Outer Test Spool valve, IBOP 2) Blind Rams, CMV 4-5-6, HCR Kill, Inner "Test Spool valve, Manual IBOP Open Ch 2. Outer fest Spool val\ i hill L 0..1(10.) o1{ }its Pipe. hydro IBOP] Make up 1-F 38 DAM and T1 W 131orr I)WN 3)Blind Rams, CMV 7-8-9, Manual Kill, Inner Test Spool valve, HT38 TIW 1-5-6. 1 ICIZ kill j 4) Super Ch & Man Bean Ch Open ('li 7-91 5) Blind Rams, CMV 10-11 (8), Manual Kill, Inner Test Spool valve, HT38 Dart : )pen Super (°h & Man Bean ii.► I More I est I lose to Cellar test spool vale 6) Blind Rams, CMV 12-13-15 (8), Manual Kill !Open Ch 101 l 7) Annular, CMV 14, Manual Kill, 8rd TIW j Open Ch 8- I2- l _ 8) UPR, Choke HCR, Manual Kill, 8rd TIW I (I)pen auk: 9) UPR, Manual Choke, Manual Kill, 8rd TIW j()pen ( hole 1 (`K I 10) Lower Pipe Rams, 8rd TIW Koomey Test Q .y4 P l6 l;lo WELL#1G-11 KOOMEY DRAW DOWN TEST DATE:3/16/15 TIME: JJ : 30 STARTING PRESSURES MANIFOLD 4-00 ACCUMULATOR 3000 ANNULAR J 000 PRESSURE AFTER ALL RAMS FUNCTIONED= 1700 PSI UPPER RAM= to SECONDS LOWER RAM = 7 SECONDS ANNULAR= 17 SECONDS BLIND= 7 SECONDS HCR KILL= I SECONDS HCR CHOKE= / SECONDS 200 PSI RECOVER Y= / S, SECONDS FULL SYSTEM RECOVERY= 911 SECONDS ELEC. PUMP RECOVERY= 3 -3 SECONDS 2 RAMS 1 HCR AIR PUMP RECOVERY= S � SECONDS 1 RAM 1 HCR 5 Koomey bottles @ 2000 PSI Start Time of Test: / a 3 v End Time of Test: '6 a 0 Total Test Time: S IS rj/{ 4 183131 25 477 WELL LOG TRANSMITTAL DATA LOGGED 5/6/2015 h4.K.BENDER To: Alaska Oil and Gas Conservation Comm. February 26, 2015 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RECEIVED MAR 0 6 2015 RE: String Shot Record: 1G-11 AOGCC Run Date: 2/9/2015 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com 1G-11 Digital Data in LAS format, Digital Log Image file 1 CD Rom 50-029-21008-00 SEWED fi PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: SignedP/)A4414"4" ô4tei of TR �s7 THE STATE Alaska Oil and Gas �� ofALASI�:A Conservation Commission Witt x =� 333 West Seventh Avenue r GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main. 907.279.1433 ALAS10. Fax: 907.276 7542 (�/� www.aogcc.alaska.gov %A����� ED 11E. 6 1<U D Theresa Lee Wells Engineer ( 31 ConocoPhillips Alaska, Inc. 9j F P.O. Box 100360 Anchorage, AK 99510 Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1G-11 Sundry Number: 315-087 Dear Mr. Lee: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P. oers er Chair DATED thisay of February, 2015 Encl. RECEIVED • STATE OF ALASKA FEB 17 2015 • ALr-._..A OIL AND GAS CONSERVATION COMM. ON • APPLICATION FOR SUNDRY APPROVALS ����C 20 AAC 25.280 1.Type of Request: Abandon r Plug for Redrill p . Perforate New Pool r Repair w ell r Change Approved Program r Suspend r Plug Perforations 17. Perforate r Pull Tubing r Time Extension r Operational Shutdow n r Re-enter Susp.Well r Stimulate r Alter casing r Other: f 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number: ConocoPhillips Alaska, Inc. Exploratory r Development F7-• 183-131 • 3.Address: Stratigraphic r Service r• 6.API Number: P.O. Box 100360,Anchorage,Alaska 99510 50-029-21008-00 • 7.If perforating, 8.Well Name and Number. What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require spacing exception? Yes r No r KRU 1G-11 • 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL 25640 • Kuparuk River Field/Kuparuk River Oil Pool • 11. PRESENT WELL CONDITION SUMMARY Total depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft) Effective Depth TVD(ft): Plugs(measured): Junk(measured): 8208 • 6918 ' 8105' 6829' none none Casing Length Size MD TVD Burst Collapse CONDUCTOR 68 16 106' 106' SURFACE 2314 10.75 2351' 2206' PRODUCTION 8151 7 8188' 6901' Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade. Tubing MD(ft): - 7540-7590,7676-7722,7945-7950,7960-7982 6355-6397,6469-6507,6694-6698,6706-6725 3.5 J-55 7841 Packers and SSSV Type: Packers and SSSV MD(ft)and ND(ft) PACKER-OTIS RRH PACKER • MD=7402 TVD=6241 PACKER-OTIS WD PACKER • MD=7813 TVD=6583 SSSV-CAMCO TRDP-1A SAFETY VALVE • MD=1930 TVD=1848 12.Attachments: Description Sunmary of Proposal p 13. Well Class after proposed work: Detailed Operations Program r BOP Sketch r Exploratory r Stratigraphic r Development r• Service r 14.Estimated Date for Commencing Operations: 15. Well Status after proposed work: A sand abandoned,C sand suspended 3/14/2015 Oil r Gas r WDSPL r Suspended F.7 w.3 16.Verbal Approval: Date: VVINJ r GINJ r WAG r Abandoned Commission Representative: GSTOR r SPLUG r 11 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact. Theresa Lee @ 263-4837 Email: Theresa.M Lee@conocophillips corn Printed NameTherresaaLee Title: Wells Engineer Signature/7it 7/y� � may' Phone:263-4837 Date z - 13- )S Commission Use Only 1 Sundry Number. Conditions of approval: Notify Commission so that a representative may witness rj--- --(3 -1 Plug Integrity r BOP Test Mechanical Integrity Test r Location Clearance r Other: / (i /0 fes-5 f fi. T G & G p $ ,, !/ 9�6 X7 5 / ,1,1 P S.a ' 71Klviv/nvprr ✓C ltr 1--r-sI- iv ZScc.)p..)sr Spacing Exception Required? Yes 0 No [ Subsequent Form Required: /[t2 — 4 (j 7- APPROVED BY Approved by:( 4 ( � % ' 4's- COMMISSIONER THE COMMISSION Date: Z-2-0—/5— Approve• application is valid for 12 month tom the date of approval. 6� A_�/S oRIGINAL P1.4_ 1 Form 10-403(Revised 10/2012) � � Submit Form and Attachments in Duplicate VrL z/zoll.s mss— RBDMSJ* FEB 2 3 2015 • RECEIVED ConocoPhillips Alaska FEB 17 2015 P.O. BOX 100360 /A OGCC ANCHORAGE,ALASKA 99510-0360 �A February 11, 2015 Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby submits an Application for Sundry Approval to workover the Kuparuk .?,.oci -1'3,\injection Well 1G-11 (PTD# 183-131). Well 1G-11 was drilled and completed in 1983. The well was completed with a selective completion in the A-Sand and C-Sand. In 2003, a leak was identified in the upper packer and a retrievable patch was run to fix the tubing by inner annulus communication. Production profile in 2007 showed 100% C Sand Production. 1G-11 was shut-in January 11, 2015 for well work and the rig workover operations. i A coiled-tubing drilling sidetrack is planned for the well, targeting the C-Sand in the 1G area. A rig workover is required to replace the patched tubing, in preparation for the CTD sidetrack. The proposed workover will pull the existing 3-1/2" tubing, the top packer and the selective completion. The lower packer will be left in place and the A-sand will be abandoned. A new liner top packer will be run with a 3-1/2" cemented liner below over the C-Sand. A new 3-1/2" gas lift completion will be installed. This Sundry application is intended to document the proposed work on the producing well 1G-11 and to request approval to workover the well. If you have any questions or require any further information, please contact me at 263-4837. Regards, 40-(f2b49\ Theresa Lee Workover Engineer CPAI Drilling and Wells Theresa.M.Lee@conocophillips.com fa9o/L'Ctiv"��, wet �fc Orc'f9t rD <' (�-o $otP 1 w ,',4 c U,9/-per— CO— o� - 765. P/v15,4/ r%i 4-elf recin'I< C 0vlos q //ow 740,- ,'v 9cc eq� fedIvo. 6'04 J�'f Po,T,'d" OC Tie Pb0/ 1G-11 Kuparuk Producer Rig Workover (PTD #: 183-131) Current Status 1G-11 was shut-in January 11, 2015 for well work and the rig workover operations. Scope of Work The goal of the workover is to set-up the well for a CTD sidetrack, targeting the C-Sand. A tubing patch at the top packer does not allow adequate clearance for CTD. The workover will replace the tubing and fix the tubing by inner annulus leak and allow for CTD. Attempts were made to pull the patch pre-rig without success. The rig will pull tubing and the patch, packer and selective. The A-Sand will be cemented and abandoned. We will run a 3-1/2" liner with ZXP liner-top packer across the C-Sand and cement in place. A 3-1/2" gas lift completion will be run. The wellhead will be upgraded from 3k to 5k psi. The well will remain shut-in following the RWO. General Well info MPSP: 1,906 psi using SBHP from June 10, 2014 with a 0.1 psi/ft gas gradient Reservoir pressure/TVD: 2,566 psi at 7,830' MD (6,598'TVD) SBHP taken on June 10, 2014 Wellhead type/pressure rating: McEvoy Gen 1, 11" 3k btm x 11" 3k top flange: A retrofit is planned to upgrade the tubing head and adapter from 3k to CIW C Bowl 5k. BOP configuration: Annular/ Pipe Rams/ Blind Rams/Mud Cross/ Pipe Rams MIT Results: MIT-OA, to 1800 psi: Passed, December 19, 2014 TIFL: Passed, November 25, 2013 Well Type: Producer Estimated Start Date: March 14, 2015 Production Engineer: John Cookson 265-6547/John.Cookson@conocophillips.com Workover Engineer: Theresa Lee 263-4837/Theresa.M.Lee@conocophillips.com *Note: Schematic is 17' higher than the tubing tally, tally is used for procedure depths. Pre-Rig Work 1. SL: Pull GLVs above patch, set DV. MIT-IA to 2,500 psi. Pull valve from GLM#7, leave open. 2. COIL: Pull KB straddle tubing patch, bottom end of one-run patch is stabbed into X Profile in SBR above top packer. 3. SL: Pull GLVs below packer, set DVs. 4. DSL: Get SBHP after 5 days shut-in. 5. DSL: Make cut at 7,340' RKB in full joint above SBR, below GLM 7. 6. DHD: PT tbg &csg packoffs, FT LDS's. 7. Ops: Set BPV within 24 hours of rig arrival. Proposed Procedure 1. MIRU. Pull BPV. Reverse circulate kill weight fluid. Verify well is dead. 2. Set HP BPV PT to 1,000 psi from below if possible, ND tree, NU BOPE & PT to 3,000 psi. 3. Pull BPV, screw in landing joint, BOLDS's, unland tubing hanger. 4. POOH, laying down tubing above 1st tubing cut at 7340'. 5. MU overshot and single in on drillpipe, latch onto tubing stub &jar SBR free. POOH, standing back DP. 6. RU E-Line and cut above and below selective at 7,540' and 7,785'. 7. MU overshot w/RatPack, RIH & latch onto slickstick&jar upper RRH packer free down to 2nd tubing cut at 7,540'. POOH standing back DP, lay down packer. 8. MU overshot w/RatPack, RIH & latch onto tubing stub& rattle selective free down to the 3fd cut at 7,785'. POOH standing back DP, selective, and blast rings. MU overshot, RIH & latch onto tubing stub at 7,785' and jar free. POOH standing back DP, tubing stub, locator mandrel and seal assembly. 9. RIH w/double string mills, magnets, and boot baskets; cleanout to 7,813' MD. Circulate well clean. POOH standing back drillpipe. 10. On TOH, seta storm packer w/drillpipe hanging below. RU Hydratight equipment. NDBOP &Tbg head, replace tbg head & IC packoffs, NU BOP &test. Pull storm packer. 11. RIH on DP and set a cement retainer at 7,800'. RU SLB Cement crew. Sting into cement retainer and pump cement over the A sand to abandon. POOH, standing back DP. 12. MU lower completion 3-1/2" liner assembly and ZXP Liner top packer on DP and TIH to just above the cement retainer at 7,800'. ZXP Liner top packer spaced out to set at—7,315' MD. 13. RU SLB Cement crew and pump cement around 3-1/2" scab liner in place per SLB cementing procedure. 14. Drop plug and Pressure up to set liner hanger. Slack off to verify hanger is set. Pressure up to to release running tools. 15. PU to expose rotating dog sub and slack off to set Liner Top packer. Pick up and reverse circulate cement out of the hole until clean fluid returns. POOH laying down drillpipe. 16. MU and TIH with new gas lift completion to just above the SBE. 17. Spot corrosion inhibited brine around completion. Sting seals into SBE, locate and space out 3ft from fully located. 18. Space out w/pups, MU hanger. Land the hanger, RILDS. 19. PT the tubing, bleed tubing off, PT the IA. Bleed the IA to zero, then the tubing. Ramp up the IA pressure quickly to shear the SOV. 20. Pull the landing joint, install HP BPV. PT BPV to 1,000 psi from below. 21. NU tree. Pull BPV& install tree test plug. Test tree. Pull test plug. 22. Freeze protect well w/diesel. Set BPV. RDMO. Post-Rig Work: 1. Reset well house(s) and flowlines of adjacent wells. 2. Pull BPV. 3. Pull and Replace SOV for CTD 4. Turn well over to CTD/operations. KUP PROD 1G-11 ConocoPhiIIips :, Well Attributes rMax Angle&MD TD Alaska�IIC. FF Wellbore APIIUWI Field Name Wellbore Status ncl(°) MD(ftKB) Act Btm(ftKB) t,_„,WWII,,„41 500292100800 KUPARUK RIVER UNIT PROD 41.68 4,900.00 8,208.0 °". Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date 1G.11,2/420156'.47'.06 PM SSSV:TRDP 100 12/16/2013 Last WO: 12/23/1983 40.99 9/19/1983 Vertical schematic(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date Last Tag:SLM 7,946.0 6/10/2014 Rev Reason:GLV C/O lehallf 2/4/2014 HANGER,31.2 Sj al as ng ngs Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD),,,Wt/Len(I,.,Grade Top Thread 11 1CONDUCTOR 16 15250 38.0 106.0_ 106.0 65.00 H-40 WELDED L ( Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(L..Grade Top Thread 71• SURFACE 103/4 9.950 37.0 2,351.3 2,206.1 45.50 J-55 BTC Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(L..Grade Top Thread 1111. �� .�TubingTION 7 6276 37.1 8,187.7 6,900.9 26.00 J-55 BUTT Tubing Strings Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft..Set Depth(TVD)(...Wt(IbW) Grade Top Connection CONDUCTOR,380-106.0 • TUBING WO 3 12 2.992 31.2 7,841.2 6,606.2 930 J-55 EUE8RDMOD I!Lit Completion Details SAFETY VLV;1.930.1 . I. Nominal ID 11111 Top(ftKB) Top(TVD)(ftKB) Top Incl(°) Item Des Com (in) 31.2 31.2 0.10 HANGER MCEVOY TUBING HANGER 3.500 GAS LIFT;2.030.2 II 1,930.1 1,847.6 31.79 SAFETY VLV CAMCO TRDP-1A SAFETY VALVE 2813 7,376.2 6,219.7 35.10 SBR OTIS SBR(2.81"X NIPPLE PROFILE) 2.813 I 7,402.3 6,241.2 34.87 PACKER OTIS RRH PACKER 2.970 7,541.7 6,356.6 3356 BLAST RINGS BLAST RINGS(3) 2.992 SURFACE;37.1-2,351.3 7,6572 6,4529 33.74 BLAST RINGS BLAST RINGS(3) 2.992 GAS LIFT,3,703.8 g 7,812.7 6,582.3 3328 LOCATOR OTIS LOCATOR 2.992 II 7,813.1 6,582.6 33.28 PACKER OTIS WD PACKER 4.000 GAS LIFT;4,941.7 7,816.5 6,585.4 33.25 MILLOUT OTIS MILL OUT EXTENSION 4.410 7,830.8 6,597.4 33.15 NIPPLE CAMCO D NIPPLE NO GO 2.750 GAS LIFT,5.753.7 7,840,4 6,605.5 33.09 WLEG OTIS WIRLINE RE-ENTRY GUIDE,ELMD TTL @ 7822 3.015 during PPROF on 9/27/2007 III Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) GAS LIFT;6,331.6 Top(TVD) Top Incl IIITop(ftKB) (ftKB) CI Dec co. Run Date ID(in) s 7,359.0 6,205 7 35.24 PATCH TUBING PATCH 8 PACKER SET WITH CTU,TOP 1/302003 1.812 GAS LIFT;6,849.2 ii- OF PATCH HAS 3"GS FISHING NECK,SET 11 11 1/30/2003 GAS LIFT;7,340.0II Perforations&Slots Shot 11 Dens Top(TVD) Btm(TVD) (shots/( PATCH;7.3590 Top(ftKB) Btm(ftKB) (ftKB) (ftKB) Zone Date t) Type Com �I 7,540,0 7,590.0 6,355.2 6,396.9 C-4,1G-11 12/23/1983 120 IPERF 120 deg Phasing;5" SBR;7.376.2 , Dresser Atlas C 7,676.0 7,722.0 6,468.5 6,506.7 C-1,1G-11 12/23/1983 12.0 IPERF 120 deg Phasing;5" PACKER,7,402.3 ' Dresser Atlas 7,945.0 7,950.0 6,693.5 6,697.7 A-5,1G-11 3/30/1984 4.0 APERF 90 deg Phasing;RigidJet PRODUCTION;7,437.7 II■■ 7,960.0 7,980.0 6,706.2 6,723.2 A-4,10-11 11/26/1993 4.0 RPERF 180 deg.Phasing;163 CCW orientation;2 5/8" Titan HC PRODUCTION;7,504.8 g- 7,980.0 7,982.0 6,723.2 6,724.9 A-4,1G-11 3/30/1984 4.0 APERF 90 deg Phasing;RigidJet I Mandrel Inserts - (PERF;7,540.0-7,590.0---. i St ati on Top(TVD) Valve Latch Port Size TRO Run N Top(ftKB) (ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date Com 2,030.2 1,932.6 OTIS SPM 1 GAS LIFT DMY BK 0.000 0.0 1/122015 III 2 3,703.8 3,321.0 OTIS SPM 1 GAS LIFT DMY BK 0.000 0.0 1/12/2015 IPERF;7.676 0-7,722 0- I 3 4,941.7 4,282.4 OTIS SPM 1 GAS LIFT DMY BK 0.000 0.0 1/12/2015 4 5,753.7 4,921.5 OTIS SPM 1 GAS LIFT DMY BK 0.000 0.0 1/13/2015 5 6,331.6 5,374.5 OTIS SPM 1 GAS LIFT DMY BK 0.000 0.0 1/2/2003 6 6,849.2 5,793.6 OTIS SPM 1 GAS LIFT OPEN BK 0.000 0.0 1/20/2015 7 7,340.0 6,190.2 OTIS SPM 1 GAS LIFT DMY BK 0.000 0.0 12/23/1983 8 7,437.7 6,270.2 OTIS SPM 1 PROD CV BEK 0.000 0.0 6/14/2001 PRODUCTION;7,775.2 9 7,504.8 6,325.9 OTIS SPM 1 PROD CV BEK 0.000 0.0 6/14/2001 1 7,775.2 6,551.0 OTIS SPM 1 PROD CV BEK 0.000 05 6/13/2001 II 0 LOCATOR;7,812.7 LA Notes:General&Safety PACKER;7,813.1 "" " End Date Annotation ' 1/20/2004 NOTE:WAIVERED WELL:IA x OA COMMUNICATION MILLOUT;7,816.5 l�-1t 9/16/2010 NOTE:View Schematic w/Alaska Schematic9.0 11 NIPPLE;7,830.8 a WLEG,7.840.4 . APERF;7,945 0-7,950 0- RPERF;7,960.0-7.980.0 APERF;7,980.0.7,982.0 PRODUCTION;37.1-8,187.7--. , l I''- • 1G-11 ConocoPhulhps CTD Setup Liner install _ - 3-1 r"x 1-1/2" Camco MMG @ 4,127' II I 3-1 ."x 1-1/2"Camco MMG @ 4,127' Casing- 10-3/4"45.5#, J-55 BTC to 2,351' MI 3-1/2"x 1-1/2" Camco MMG @ 5,282' 1111 3-1/2"x 1-1/2" Camco MMG @ 6,173' Casing-7"26#J-55 BUTT to 8,188' 0" MI I I iiii 3-1/2"x 1-1/2" Camco MMG @ 6,795' 3-1/2"x 1-1/2" Camco MMG @ 7,277' Tubing -3-1/2"9.3#, L-80, EUE 8rd to 7,305' ► INI ,J 80-40 GBH-22 Seal Assembly @ 7,305' 5"x7"2-RH ZXP Liner top Packer @ 7,316' et• .r•r• -.... r"" 5"x 7" Flex Lock Liner Hanger @ 7,336' 123.13 }}y �•�•' 2.813"X-nipple @ 7,384' ® ii2r•r•r � r• ti{tif{r•.. -ir�•�.. :23• def A-5 Perf @ 7,945'-7,950'- --....11 ,2_.- ---:. __...o '3 .3 iiii. r•r•r• �3}3} Reperforate C sand post RWO rf :Fig:.; Proposed CTD kickoff 7,614'&7,660' for CTD pressure monitoring 4gg.. 4244 r•:•r r•r• {.t.ti. r•r•r :3ti}? A-5 Perf @ 7,945'-7,950'-'- ---'10. .e..:::::. ::•:y: "" - tif�:1 1."--- :i5Z51.:73j} a ,; Loepp, Victoria T (DOA) From: Lee,Theresa M <Theresa.M.Lee@conocophillips.com> Sent: Wednesday, February 18, 2015 7:26 AM To: Loepp,Victoria T(DOA) Subject: RE: 1G-11(PTD 183-131, Sundry 315-087)RWO to set up for CTD Lateral Attachments: 1G-11 proposed CTD schematic post-RWO.pdf Hi Victoria, I attached the Post-CTD proposed schematic.This workover is a CTD setup for the two laterals. We are cementing the 3- 1/2" liner over the C-sand to give CTD access to set two whipstocks and kick off at 7,614' and 7,660'. I talked with Gary Eller yesterday and pressures are low enough they will not need to monitor pressure (or re-perforate) prior to CDR2 moving on the well.They will be submitting another permit application for their proposed work after the workover is complete. Please let me know if you have any other questions. Thank you, Theresa Lee Wells Engineer ConocoPhillips Alaska Office:907-263-4837 Cell:505-301-6483 From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent:Tuesday, February 17, 2015 1:52 PM To: Lee, Theresa M Subject: [EXTERNAL]1G-11(PTD 183-131, Sundry 315-087)RWO to set up for CTD Lateral Theresa, If the C Sand perforations will be open post RWO and there are no plans to plug the C Sand perforations,then this would be a CTD set up for a lateral and not a plug for re-drill. Do you have a post CTD schematic? Please explain your C Sand pressure CTD monitoring. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work (907)793-1247 Victoria Loepp aS alaska qov CONFIDENIIAL11Y NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loepo@alaska.gov 1 G_ _ r in 0 a E. O0 o) cNi7 .a .0 0 O� J7_O O l0- V C II fes- II n �V in E 0 !6 ��jp O� dNN .o a 1-, a. �..__ L. v � a) Q N IF D a csi aoO s oc2 $ o c) oU -o M a 0 Z p'o y d O W _0 ca C O Y X Q coOQ, Z J O n.-o -+ a 7 go , F y Q0 �p� co Co co 0 LU a ID O �4 V a) a3 N- 6 c O C�? Q rn p 0) U O a r t �N VAN rco > H a 5 ) o2 a N a) ' M .Q "C j y a O a O o a �' N CU 0 O F- c XX C a� g .2 > O v m X m .5 w ch rn O O a 8 co E x -o d Q c co c 03 So C t u" - 6@ N U CO y /�/��,� -C (��l L 0 0 W ct cc c) u w .O a) lJ f6^v d N co al m N N O °-al a o iia o m 0 o m cam.)S m E H E HU U a U A = >Q N T w >ri 0303 W O A M `� I it I /i i/ i i //'::::: i 1 ) s, i ,',/'; coii ill CD ,...,. :. . / .;..:.4—\ ili iv !!! III U I I(I CI) �N(n O ° rnmm -C d a0 22 2.E 000 0 �a O '� ON (00� C C yN8-8 I-6) a O)N (Oa O O •C co -3O (=i) M `tin r` a� E E n� ao T" ,�NNpS� �_ atf C_ _ r "tF] �V aVr - ONN a I NO E O V' _2 � �nm ( cU o QN- (' a CO 01) Ci000 er0 �0 O ct0(0 Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box in the (Patricia or Steve upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" _- boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed (Patric or Steve work) the initial reviewer will cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, then check the "Suspended" box and initial that change. Guy or Victoria The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug for Jenni Redrill" box, she will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, she will check the History tab Jenni in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, she will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will change Jenni the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Jenni Geologists will check the "Well by Type Work Outstanding" user query in Patricia or Steve RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. ge Project Well History File~ver Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file, f L Well History File Identifier RESCAN DIGITAL DATA OVERSIZED (Scannable) [] Color items: [] Diskettes, No. [] Maps: [] Grayscale items: [] Other, No/Type [] Other items scannable by large scanner [] Poor Quality Originals: OVERSIZED (Non-Scannable) [] Other: "' · ,~ ~3. Logs of various kinds NOTES: [] Other BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: IS/ Project Proofing BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /S/ Scanning Preparation ~.~ x 30 = ~_~ + = TOTAL PAGES../ ~)- BY: BEVERLY BREN VINCENT SHERYL ~ LOWELL DA TE:}I I / Production Scanning Stage I Stage 2 BY~ (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY. GRAYSCALE OR COLOR IMAGES ) PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ~,, YES NO ~BREN VINCENT BHERYL MARIA LOWELL DATE:II¢~I"0~" /S/~ FOUND: IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE YES NO III Ill lib illll RESCANNEDBY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: Is~ General Notes or Comments about this file: Quality Checked 2\1 L WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. July 18, 2012 Attn.: Howard Okland 333 West 7th Avenue,Suite 100 Anchorage, Alaska 95501 `%%AWED h RE: Multifinger Imaging Tool (MIT) : 1G-11 Run Date: 7/17/2012 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Klinton Wood, Halliburton Wireline& Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 1G-11 Digital Data(LAS), Digital Log file, Casing Inspection Report, 3D Viewer 1 CD Rom 50-029-21008-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline&Perforating Attn: Klinton Wood 6900 Arctic Blvd. Anchorage,Alaska 99518 Office: 907-273-3527 Fax: 907-273-3535 klinton.wood@halliburton.com Date: 9 H l2 Signed: Yilage-e-e-,- !~,~~- p`~~Q- - ~~~~~m~~~~~ ~ ~ ~ ;; ~, I'i. ~' _ N0.4445 Schlumberger -DCS 2525 Gambell Street, Suite 400 Company: Alaska Oil 8~ Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth ~,~~~j ~~,~ ~ ZQ~~ 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Kuparuk Well Job # Log Description Date BL Color CD 10/15!07 2N-343 (REDO) 11745232 MEM INJECTION PROFILE ~ C - '~` 08108107 1 1 B-14 11837493 PRODUCTION PROFILE - ~ - 08/27/07 1 1A-18 11839651 PRODUCTION PROFILE b- 08130/07 1 1Y-18 11837499 PRODUCTION PROFILE C' - 08/30/07 1 1G-14 11839652 INJECTION PROFILE ~[~. ?~- 08/31/07 1 1A-01 NIA USIT - 08131/07 1 1Y-04 11839653 INJECTION PROFILE ~~ ~ 09101107 1 1Y-32 11839655 PRODUCTION PROFILE '~`~- 09/02/07 1 2T-TAS-01 11839656 INJECTION PROFILE ~ - ~ 09!03107 1 2K-25 11846439 INJECTION PROFILE () = l 09/06/07 1 2K-18 11846440 INJECTION PROFILE I -~ 09/07107 1 16-18 11846441 PRODUCTION PROFILE ~/ - (p 09/08107 1 2T-20 11846442 PRODUCTION PROFILE fJ - 09109107 1 2N-310 11850433 SONIC SCANNER 7L~'~ -U ~ 09/16/07 1 2N-310 11850433 SONIC SCANNER-FMI `~ - C~`-~ 09/16107 1 1J-176 11846443 USIT "~-p 09/17/07 1 1E-29 NIA UCI ~ - l 09/19/07 1 3F-21 11837503 RSTI WFL 09/20/07 1 26-10 11839661 INJECTION PROFILE L - 09!22107 1 1G-05 11837506 INJECTION PROFILE v S C 09/23107 1 2H-13 11839662 INJECTION PROFIL 4 - 09/23!07 1 1B-05 11837508 INJECTION PROFILE ~ „L ° 09/24/07 1 3H-08 11839663 PRODUCTION PROFILE - ~j 09/24/07 1 1Y-31 11839664 PRODUCTION PROFILE j ~j - 09125107 1 1G-06 11839665 INJECTION PROFILE + 09/26/07 1 2Z-01A 11837512 USIT - J i 09127!07 1 2V-08A 11837511 ISOLATION SCANNER '~~(- ~ 09/28/07. 1 1G-11 11837513 PRODUCTION PROFILE 09/29107 1 1Y-22 11837515 PRODUCTION PROFILE ~ - 6 09/30/07 1 Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. • • 01/20/06 Schlumberger NO. 3663 Schlumberger -DCS RECE\VEO 2525 Gambell Street, Suite 400 Com pany: Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Helen Warman ATTN: Beth JAN 2 4 2006 333 West 7th Ave, Suite 100 Anchorage, AK 99501 ~CI&Gasecns.~ Field: Kuparuk ~~ Well Job # Log Description Date BL Color CD --.,v 1 E-03 11144062 PROD PROFILE W/DEFT 01/14/06 1 1F-14 11144063 PRODUCTION PROFILE 01/15/06 1 28-14 11141241 PRODUCTION PROFILE 12/31/05 1 2G-14 11166751 SBHP SURVEY 01/12/06 1 1 E-06 11154118 PROD PROFILE W/DEFT 01/11/06 1 2X-05 11141246 INJECTION PROFILE 01/05/06 1 3A-04 11166752 INJ PROFILEIWFL 01/13/06 1 38-05 11154115 INJECTION PROFILE 01/09/06 1 2X-18 11154114 SBHP SURVEY 01/08/06 1 2X-18 11154117 PROD PROFILE WIDEFT 01/10/06 1 2 H -0 9 11154103 PROD PROFILE W/DEFT 12/29/05 1 1 G-11 18~'" ;ßI 11154113 PROD PROFILE W/DEFT 01/07/06 1 2X-04 11141245 INJECTION PROFILE 01/04/06 1 2Z-13 11141242 PROD PROFILE WIDEFT 01/01/06 1 1 C-20 11133212 SCMT 12/25/05 1 2C-11 11144065 PROD PROFILE WIDEFT 01/17/06 1 -/ 2N-339 N/A BHP SURVEY 12/01/05 1 20-04 N/A BHP SURVEY 12/03/05 1 2U-13 11166753 PROD PROFILE WIDEFT 01/14/06 1 1 E-05 11166747 PROD PROFILE W/DEFT 12/25/05 1 2M-01 11154119 PROD PROFILE WIDEFT 01/19/06 1 SIGNED: G'\ '? r¡fìf1r- ¿.'""'r- fàM!ìt..'iI!b::!f"\ ~ r i\J "1. ~ ,-ú...:1} i)t;I~'O~"'C~~ (.-1 r-H - (..¿ DATE: I};~o ~ ) Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. ConocOphillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 February 7, 2003 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Dear Mr. Maunder: Enclosed please find 10-404 Sundry Notices for ConocoPhillips Alaska, Inc., wells 1F-19 (PTD 196-052) and 1G-I 1 (PTD 183-131). The Sundry Notices regard tubing patches run to fix tubing leaks. Please call Jerry Dethlefs or me at 907-659-7224 if you have any questions. Sincerely, ConocoPhillips Problem Well Supervisor Attachments RECEIVED FEB i ':; 2003 Alaska Oil & Gas Cons. Colnmissior~ .Anchora9~ AL,~, OIL AND GAS CONSERVATION COMMIS,'~'-N REPOR, OF SUNDRY WELL OPER,-,,'IONS 5. Type of Well: Development ._X Exploratory __ Stratigraphic __ Service._ "'":' ........ ' ........ '"~ ~' ' 6. Datum el~vation (DF or KB feet) 2. Name of Operator ConocoPhillips Alaska, Inc. RKB 99 feet 7. Unit or Property name 3. Address P. O. Box 100360 Anchorage, AK 99510-0360 4. Location of well at surface 4952' FNL, 4474' FEL, Sec. 29, T12N, R10E, UM At top of productive interval (asp's 540586, 5980976) (asp's 544077, 5978920) At effective depth At total depth 1747' FNL, 1000' FEL, Sec. 32, T12N, R10E, UM Kuparuk Unit 8. Well number 1G-11 9. Permit number / approval number ',3 183-131 / 10. APl number 50-029-21008 11. Field / Pool Kuparuk Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length CONDUCTOR 106' SUR. CASING 2253' PROD. CASING 8089' 8208 feet Plugs (measured) 6918 feet 8105 feet Junk (measured) 6829 feet Size Cemented 16" 212 SX CS II 10-3/4" 930 SX AS III 7 250 SX AS I 7" 610 SX Class G & 250 SX AS I Measured Depth 106' 2352' 8188' True ve~icalDepth 106' 2207' 6901' Perforation depth: measured 7540' - 7590', 7676' - 7722', 7945' - 7950', 7960' - 7982' true vertical 6355' - 6397', 6468' - 6507', 6694' - 6698', 6706' - 6725' Tubing (size, grade, and measured depth) 3-1/2', 9.3#, J-55 Tbg @ 7824' MD. Packers & SSSV (type & measured depth) OTIS 'RRH' @ 7385' MD; OTIS 'WD' @ 7796' MD; CAMCO TRDP-1A @ 1913' MD. RECEIVED 13. Stimulation or cement squeeze summary Intervals treated (measured) 3-1/2" tubing patch set @ 7359' - 7385" MD Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Averaqe Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl 678 676 2463 Well had not been returned to operation as of 2/7/2003. Casing Pressure Tubing Pressure 190 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __X Oil_ X Gas__ Suspended__ Service _Water Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed-'/~/~y/~~c-''''''''''''/''// Title Production Engineering Supervisor MJ Love/and / Questions? Call MJ Loveland 659-7224 Form 10-404 Rev06/15/88-RBDMS BFL FEB I 2 2003 SUBMIT IN DUPLICATE PDS REPORT JOINT TALLY SHEET Pipe: 3.5 ins 9.3 ppf J-55 8RD EUE Wall thickness: Body ~ 0.254 ins Upset = 0.254 ins Nominal ID: 2.992 ins Joint Depth Length Modal Mean Nominal Nominal Type No. ID ID ID OD feet feet inches inches inches inches 230 6894.66 29.45 2.991 2.987 2.992 3.500 231 6924.11 29.87 3.008 2.999 2.992 3.500 232 6953.98 30.14 3.004 2.999 2.992 3.500 233 6984.12 30.87 3.003 2.995 2.992 3.500 !234 7014.99 29.46 3.005 2.996 2.992 3.500 235 7044.45 29.70 3.012 3.002 2.992 3.500 236 7074.15 30.31 2.983 2.971 2,992 3.500 237 7104.46 31.42 3.004 2.997 2.992 3.500 238 7135.88 31.52 3.008 2.999 2.992 3.500 239 7167.40 29.96 3.009 2.998 2.992 3.500 240 7197.36 30,90 2.996 2,999 2.992 3.500 241 7228.26 30.37 3.010 3.007 2,992 3.500 242 7258.63 30.21 2.996 2.989 2.992 3.500 243 7288.84 24.21 3.010 3.007 2.992 3.500 243.1 7313.05 14.09 N/A N/A 2.992 3.500 Im 244 7327.14 24.78 2.992 2.999 2.992 3.500 244.1 7351.92 6.14 N/A N/A 2.992 3.500 br 244.2 7358.06 23.26 N/A N/A 2.992 3.500 iacker 244.3 7381.32 6.50 2.991 2.995 2.992 3.500 ~up 245 7387.82 29.20 3.006 3.004 2.992 3.500 245.1 7417,02 9.29 N/A N/A 2.992 3.500 Im 246 7426.31 30.89 2.987 2.985 2.992 3.500 247 7457.20 28.98 2.992 2.989 2.992 3.500 247.1 7486.18 8.16 N/A N/A 2.992 3.500 :lm 248 7494.34 N/A 3.018 3.017 2.992 3.500 Well: 1G-11 Field: KUPARUK Co/npany: CONOCO PHILLIPS ALASKA INC Country: USA Survey Date: JANUARY 16, 2003 Joint Depth Length Modal Mean Nominal ',lominal Type No. ID ID ID OD feet feet inches inches inches inches Joint Tally page 1 Jan 15 03 08:088 PR] MELL$ GROUP ~U't U~9 'l~t4 p.~ f/38,5-731 OO:6.156) PKR 00-6_ 156) Nil KRU 1G-11 !I0(~800 PROC] 7559 S$SV' TRDP Orig 9/19/t983 Angle ~ TD: deg ~ 6208 Annular FlUid: Rev Reason: (3LV (lesiOn, pull TD: 8208 RKB 11/28J~02 Gaeing:_S_ M~ AEL STRINGS-.:. ' ' ' - Oesc~n ..... I size f To~ ~ -ao~"l'-~ "'i '~t i Gmee ] Thread Size I Top [ ao~ I .~O,. ~ ~ I G~ i Th~ad 3.~0 J 0 I T~4 i- 6592 1_:9-30 ! ~55 I eRD_~E 1D~r Atlas , , 7945-~950 ~698 A-5 ] ' --- I S '1 ,4 [~3~19~' ~l~deg Pha~g; Rigid Jet 3 [49251 42701 ~ls- p SPM ~ I ~ I t:0 ! aK J 0.000 I ~ ' 11~2003 ~ ' e I 742~162671 ate ! ~ L 7359 [_6~B S~_ OI~(2.81"X ~LEPR~ILE} ,,, 2.813 J 7828 ! 6591 ~ ~s ' -' 2.992 Memory Multi-Finger Caliper Log Results Summaw Company: Log Date: Log No.: Run No.: Pipe1 Desc.: Pipe1 Use: CONOCO/PHILLIPS ALASKA, INC. January 16, 2003 4933 1 3.5' 9.3 lb. J-55 EUE 8RD Tubing Well: 1G-11 Field: Kuparuk State: Alaska APl No.: 50-029-2100800 Top Log Intvll.' 6,892 Ft. (MD) Bot. Log Intvll · 7,510 Ft. (MD) -- Inspection Type' Corrosive & Mechanical Damage Inspection COMMENTS · This caliper data is tied into GLM 9 ~ 7,488 fL drfllers depth. This log was run to assess the condition of the tubing with respect to corrosive and mechanical damages. The caliper recordings indicate that the interval of 3.5" tubing logged is in good to fair condition with respect to corrosive damage. There is a hole recorded in GLM No. 9 below the valve pocket, and what appears to be corrosive damage recorded in the top of the PBR. A 3D Log Plots of caliper recordings across the PBR and Packer is included in this report. The only other significant penetration recorded is 27% in Joint 244 @ 7,347 ft. No significant areas of cross-sectional wall loss or I.D. restrictions are recorded through out the interval logged. Cross-sectional drawings of the most significant events recorded are included in this report. The distribution of maximum recorded penetrations is illustrated in the Body Region Analysis Page of this report. The joint numbering used in this report is an estimation based on the average joint lengths and the measured depth of the log interval. 3.5" TUBING - MAXIMUM RECORDED WALL PENETRATIONS · corrosion (27%) Jt. 242 @ 7,510 Ft. (MD) No other significant wall penetrations are recorded throughout the interval logged. 3.5" TUBING - MAXIMUM RECORDED cRosS-SECTIONAL METAL LOSS: No significant areas of cross-sectional wall loss (> 6%) are recorded throughout the interval logged. 3.5" TUBING - MAXIMUM RECORDED ID RESTRICTIONS · No significant I.D. restrictions are recorded in the interval logged. Field Engineer: D. Cain Analyst: J. Thompson Witness: M. Chaney 1 ProActive Diagnostic Services, ]~nc. / P.O. Box 1369, Stafford, TX 77497 Phone: (281) or (888) 565-9085 Fax: (281) 565-1369 E-mail: PDS@memorylog.com Prudhoe Bay Field Office Phone: (907) 659-2307 Fax: (907) 659-2314 PDS REPORT JOINT TABULATION SHEET Pipe: 3.5 ins 9.3 ppf J-55 8RD EUE We]]: Wall thickness: Body: 0.254 ins Upset = 0.254 ins Field: Nominal ID: 2.992 ins Company: Country: Survey Date: Penetration Body Minimum ID inches 2.90 2.80 2.91 2.90 2.91 2.89 2.87 2.91 2.90 2.91 2.91 2.91 2.90 2.92 1G-11 KU PARU K CONOCO PHILLIPS ALASKA INC ~ penetration body USA ~ metal Doss body JANUARY 16, 2003 1 Damage Profile Comments ~ (% wall) j0 50 100 N/A Latch @ 5:00) 2.92 Line corrosion. SBR PACKER PUP Latch @ 9:30) Shallow corrosion. Lt. Deposits. Latch @ 5:00) ~osits. Damage classification scheme Penetration / projection class, in order of damage severity Hole - penetration exceeds 85% of nominal wall thickness Ring - damage area exceeds 65% of circumference, but depth range does not exceed I * pipe ID Line - damage depth range exceeds 5 * pipe ID, but extends less than 20% of circumference. General - damage depth range exceeds 1 * pipe IDand/or extends more than 20% of circumference. Isolated - damage depth range does not exceed 5 * pipe ID or extend more than 20% of circumference. Damage reporting threshold = 30 thou inches deviation in body, 50 thou in coupling.~ Modal line length = 0.500 feet. Pipe Tabulations page 1 PDS Mukifinger Ca]iper 3D Company ' Co~o¢oPhi~tips Alaska~ ~c, Field Well · 'lG4~ Date Description · Deta~ of Cad,per Record~gs over SBR a~d Packe~ Kuparuk Jaauary 16, 2883 Joint 244 SBR & Packer Pup Joint 244.3 7390 PDS REPORT JOINT TABULATION SHEET Pipe: 3.5 ins 9.3 ppf J-55 8RD EUE Well: Wa]] thickness: Body = 0.254 ins Upset = 0.254 ins Field: Nominal ID: 2.992 ins Company: Country: Survey Date: Penetration Minimum ID Comments inches 2.90 2.89 2.91 2.90 2.91 2.89 2.87 2.91 2.90 2.91 2.91 2.91 ~72.90 2.92 N/A Latch @ 5:00) 2.92 Line corrosion. ;BR PACKER 2.93 PUP 1G-11 KU PARU K CONOCO PHILLIPS ALASKA INC ~ penetration body USA ~ metal loss body JANUARY 16, 2003 Damage Profile (% wall) 50 1 O0 'Latch @ 9:30} Shallow corrosion. Lt. Deposits. Latch @ 5:00) )osits. Damage classification scheme Penetration / projection class, in order of damage severity Hole - penetration exceeds 85% of nominal wall thickness Ring - damage area exceeds 65% of circumference, but depth range does not exceed 1 * pipe ID Line - damage depth range exceeds 5 * pipe ID, but extends less than 20% of circumference. General - damage depth range exceeds 1 * pipe IDand/or extends more than 20% of circumference. Isolated - damage depth range does not exceed 5 * pipe ID or extend more than 20% of circumference. Damage reporting threshold = 30 thou inches deviation in body, 50 thou in coupling.' Modal line length = 0.500 feet. Pipe Tabulations page 1 PDS Report Cross Sections Well: 1G-11 Survey Date: JANUARY 16, 2003 Fie]d: KUPARUK Tool Type: MFC 24 No. 00387 Company: CONOCO PHILLIPS ALASKA INC Tool Size: 1.69 Country: USA No. of Fingers: 24 Tubing: 3.5 ins 9.3 ppf J-55 8RD EUE Analyst: J. Thompson Cross Section for Joint 244 at depth Tool speed = 42 Nominal ID = 2.992 Nominal OD = 3.500 Remaining wall area = 96 % Tool deviation = 32 ° 7347.12 ft Finger 3 Penetration = 0.068 ins Corrosion 0.07 ins = 27% Wall Penetration HIGH SIDE: UP Cross Sections page 1 STATE OF ALASKA AL.A~r~A OIL AND GAS CONSERVATION COMMIS~..JN REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Operation Shutdown ~ Stimulate Plugging Pull tubing Alter casing Repair well Perforate X Other 2. Name of Operator ARCO Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 5. Type of Well: Development X Exploratory _ Stratigraphic _ Service 327' FSL, 806' FWL, Sec 29, T12N, R10E, UM At top of productive interval 1517' FNL, 1307' FEL, Sec 32, T12N, R10E, UM At effective depth 1721' FNL, 1038' FEL, Sec 32, T12N, R10E, UM At total depth 1752' FNL, 995' FEL, Sec 32, T12N, R10E, UM 12. Present well condition summary Total Depth: measured true vertical 82O8 6918 feet feet 6. Datum elevation (DF or KB) RKB 99 7. Unit or Property name Kuparuk River Unit feet 8. Well number 1G-11 9. Permit number/approval number 83-131 10. APl number 50-029-21008 11. Field/Pool Kuparuk River Oil Field/Pool Plugs (measured) None Effective depth: measured 81 0 5 true vertical 6829 feet feet Junk (measured) None Casing Length Structural Conductor 1 0 6' Surface 2 31 1 ' Intermediate Production 81 4 3' Liner Perforation depth: measured 7540'-7590', true vertical 6355'-6396', Tubing (size, grade, and measured depth) 3.5", 9.3#, J-55 @ 7824' Packers and SSSV (type and measured depth) Size Cemented Measured depth True vertical depth 1 6" 212 SX CS II 106' 1 06' 10-3/4" 930SXASIII& 2352' 2206' 250 SX AS I 7" 610 SX Class G & 8188' 6901' 25O SX AS I 7676'-7722', 7945'-7950', 6406'-6443', 6693'-6697', 7960'-7982' 6706'-6724' PKR: Otis RRH @ 7385' & Otis WD @ 7796'; SSSV: Camco TRDP-1A @ 1913' ~. \q ~") Reperforated "A" Sand on 11/26/93. 13. Stimulation or cement squeeze summary Intervals treated (measured) 7960'-7980' ~)~., ~0 Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Inlect~o~'~ata .... OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 615 823 2623 1350 188 Subsequent to operation 733 807 1710 1400 184 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended ~ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Fnrm 1~-4f34 RRv 13R/1.~/RR 1~)r PS~ Title Senior Engineer Date RI IRMIT IN 1311PI I(';,ATF WELL ARCO Alaska,.Inc.~ Subsidiary of Atlantic Richfield Company CONTRACTOR REMARKS T~' WELL SERVICE REPORT 1-145 I~'Zo Iq20 2115 r--] CHECK THIS BLOCK If SUMMARY CONTINUED ON BACK knots J Signed ARCO Alaska, Inc. Date: December 6 1989 Transmittal #: 7618 RETURN TO: ARCO Alaska, Inc. Attn: Jenny Gamage Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted herewith are the following items. Please acknowledge receipt and return one signed copy of this transmittal. 3 H- 1 4 Kuparuk Fluid Level Report I 1 - 1 8 - 8 9 Casing 2 A- 1 1 Kuparuk Fluid Level Report 1 I - 3 0 - 8 9 Tubing 1 G-1 1 Kuparuk Fluid Level Report I 2-2- 8 9 Casing 1 Q- 13 Kuparuk Fluid Level Report I 1 - 3 0 - 8 9 Tubing 1 Q- 0 9 Kuparuk Fluid Level Report 1 I - 3 0 - 8 9 Tubing Receipt RECEIVED DEC ]. 81989 A c k n o w le d g e d' - t e),,laska Oil-&- Arichoiage DISTRIBUTION: BP Chevron D&M Mobil rfi~ state of Alaska Unocal CC: DS Engr.--<J~~ NSK Files · QP~. Engrg. Files Prod. Foreman-,l'~,j KUPARUK FLUID LEVEL REPORT Well Fluid Level Shot Down: Date sssv ~q 1"5 GLM DV or GLV ,~I~, Casing Tubing CSG Press During Shot = TBG Press During Shot= Reason For Shooting FL: · .~ To Determine Operating VaNe Well Status: Comments: On Continuous GL Operating CSG Press-= lO'lO tt GL Rate (If Available)= ~O MCFD' On Intermittent GL On Time =~ Min. · Off Time= Hr. Min. Delta Time From End Of On Cycle = No GL .. ? Mil3, RECEIVED 181 89 Alaska Oil a Gas Cons. Anchorage ARCO Alaska, Inc. ,, -..--a,: ) .. · -.-;-'=c-r,~ 9;.-7 £77 5C37 Return To: · . ARCO ALASKA, Inc. ATTN: Records Clerk ATO-1115B P.O. Box 100360 Anchorage, AK 99510 ~~Transmitted herewith are the following items. and return one signed copy of this transmittal. Date: 10/08/84 Transmittal No: 4759 PAGE 1 of 2 Please acknowledge receipt · -'-.SURVEYS/PRESSURE ANALYS~S <lA-2' 5/11,12/84 Torque Turn (Pressure & Temp Surveys) ~_~_.1~-- 6~__. 7/06/84 zlB-_ll_/ 7/10,12/84 >lA-10 5/10/84 /lC-1 12/17/83 /lC-6 8/04/~ /IG.lO-' 12/2!/83 /L~ 12/23/83 ~-i.~ S/ii/S4 ~~ 5/2~/~ ~G_~- > 5/~3,~4/~ ~ ~ 6/26/84 ~%P~Z :~ 6/30/S4 ~~' 8/~/S4 ~!~ 6/2S/~ 7/07/s4 /~-4 12/27/83 - ~ 1Y-5 12/14/83 ~ 1Y-7 12/15/83 / ~;1 7/03/84 ~/1 4/10/84 C~mlco Camco Otis Otis Static Otis Canto Camco Otis Camco Torque Turn (Pressure & Temp Surveys) Canto Static Camco ~ Camco Camco Otis Otis Static · Otis Otis Otis " Canmo Receip~ac~nowledged: B. Adams F.G. Baker P. Baxter BPAE Chevron Date: DISTRIBUTION D & N Drilling Geology Mobil NSK Operations W.¥. Pasher G. Phillips Phillips Oil J.J. Ra thmell R &-D C. R. Smith ~..State~"of:,:.:Alas'~ Sohio Union Well Files Date: 10/08/84 Transmittal No: 4759 PAGE 2 of 2 Return To: . . ARCO ALASKA, Inc. ATTN: Records Clerk ATO-1115B P.O. Box 100360 Anchorage, AK 99510 smitted herewith are the following items. Please acknowledge receipt and return one signed copy of this transmittal. G~99~--- 5~28/84 2C-1 11/09/83 2C-2 11/09/83 2C-6 11/08/83 2?_7 11/08/83 2~2g~?- 4/18/83 '> 4/24/83 ~c_-2~:_i4/22/83 r.~: 4/30/83 ~2~-~3 4/28/84 ~2YV~-~,?' 4/29/84 ~y~3~ 5/04/84 '2~5 5/o6/84 ~-5 8/~2/~ C~~ 5/08/~ 3C-6 ~/19/84 3C-6 5/17/84 .. -Otis Lynes -Lynes Lynes Lynes Camco Camco Camco Otis Camco Camco Dresser PBU Flow Survey (Gradient) Otis Static Gradient Otis Canto ._ DrEsser Dresser Mini Drawdown & Buildup Survey /cat Receipt Acknowledged: , B. Adams F.G. Baker P. Baxter BP~£ Chevron Date: DISTRIBUTION D & N Drilling Geology Mobil NSK Operations W.V. Pasher G. Phillips Phillips Oil J.J. Rathmell R&D C. R. Smith Sohio Union Well Files ARCO Alaska, In( Post Office b~,x 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 f,/tay 31, 1984 Mr. C. V. Chatterton State of Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton- Attached in duplicate are subsequent notices on the following wells at the Kuparuk River Field- Well Action Date Performed 1F-16 Perforate 4-26-84 1G-11 Fracture 4-26-84 1Y-15 Acidize 4-23-84 If you have any questions, please call me at Mike L. Laue Kuparuk Operations Coordinator 263-4253. MLL/kmc Attachment (Duplicate) ECEI ED JUN 0 ,~ '.l~'~ Alaska 0il & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ."~- -~'. STATE OF ALASKA ..--'--' ALASK,,.~. _ AND GAS CONSERVATION MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] X OTHER [] 2. Name of Operator 7. Permit No. ARCO ALASKA, INC. 83-131 3. Address 8. APl Number P. O. BOX 100360, ANCHORAGE, ALASKA 99510 50- 029-21 008 4. Location of Well SURFACE LOCATION' 327' FSL, 806' FWL, SEC. 29 T12N, R10E,. UM 5. Elevation in feet (indicate KB, DF, etc.) 99' (RKB) 12. I 6 . Lease Designation and Serial No. ADL 25640, ALK 2571 9. Unit or Lease Name KUPARUK RIVER UN IT 10. Well Number 1G-11 11. Field and Pool KUPARtJK RIVER FIELD KUPARUK RIVER OIL POOL Check ApproPriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation l~ Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tqbing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). On April 26, 1984, the-"A" sands of Kuparuk well 1G-11 were hydraulically fractured and propped. The treatment used gelled diesel as the pad and transport media and sand as the proppant. Prior to pumping, equipment was tested to 5000 psi. The sand was tagged with R. A. tracer to facilitate determination of job performance. JUN 0 i'.'_-)B N, aska Oil & Gas Cons. commission 14. I hereby certify that the forego~ is/t~ue and correct to the best of my knowledge. Signed~ . _ ~ KUPARUK Title OPERATIONS COORDi NATOR The space below for Commission use Date 5/29/84I Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date Form t0-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate -ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 Apri I 16 , 1984 b.~r. C. V. Chatterton State of Alaska Oi I and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Ak: 99501 Dear Mr. Chatterton. Attached in duplicate are subsequent notices on the following wells at the Kuparuk River Field- Well Action Date Performed 1F-9 Acidize "A" Sands 3-15-84 1F-13 Acidize "C" Sands 3-25-84 1G-11 Perforate "A" Sands 3-29-84 1Y-16 Acidize "C" Sands 3-27-84 2X-8 Fracture "C" Sands 3-20-84 if you have any questions, please call me at 263-4253. ~4ike L. Laue Kuparuk Ooerations Coordinator ~4LL/kmc Attachment (Duplicate) ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany .~----,. STATE OF ALASKA ~___----- ALASK,-. ,. AND GAS CONSERVATION ( AISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL E3X.. OTHER [] 2. Name of Operator ARCO ALASKA, INC. 3. Address P. O. BOX 100360, ANCHORAGE, ALASKA 99510 FSL, 806' FWL, SEC. 29 4. Location of Well SURFACE LOCAT ! ON- 3 27 ' T12N, R10E, UM 5. Elevation in feet (indicate KB, DF, etc.) 99' (RKB) 12. 7. Permit No. 83-131 8. APl Number 50- 029-21008 9. Unit or Lease Name KUPARUK RIVER UN IT 10. Well Number 1G-11 1 1. Field and Pool KUPARUK RIVER FIELD I6. Lease Designation and Serial No. KU PARUK R ! VER O ! L ADL 25640, ALK 2571 POOL Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: -- SUBSEQUENT REPORT OF' (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) ~ Altering Casing [] [] Abandonment [] [] Other [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). On 3-29-84 perforations density of 4 the "A" sands were perforated in Kuparuk were shot 7960'-7982' (MD) and 7945'-7950' SPF. well 1G-11. The (MO) with a shot 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. SignedJ~! __j Title OPERATIONS COOR.O I NATOR The space below for Commission use Date 4/16/84 Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10403 Rev. 7:1-80 submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 Februar.v 29, 1984 Mr. C. V. Chatterton Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear ~4r. Chatterton: Attached is a Sundry Notice of intention %o stimulate Kuparuk well 1G-!i. If Vou have any questions, please call me at 263-4253. Mike L. Laue Kuparuk Operations Coordinator MLL/kmc Attachment (In Triplicate) ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany '-'----- STATE OF ALASKA .-'---. ALASK,, ,_ . AND GAS CONSERVATION C .vllSSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL O COMPLETED WELL I~' OTHER i-I' 2. Na~SPe~a~$-~a, ]'NC. 7. Pe[:~r~t~Nf.3 1 8. APl Number 3'A~-re. ss o. BOX 100360, ANCHORAGE, ALASKA 99510 sO- 029-21008 9. Unit or Lease Name 29 KUPARUK RIVER UNIT 4. Location of Well SURFACE LOCATION: 327' FSI,, 806' FWL, SEC. T12N, R10E, UM 5. Elevation in feet (indicate KB, DF, etc.) 99 ' (RKB) 12. I6. Lease Designation and Serial No. ADL 25640, ALK 2571 10. Well Number 1G-ll 11. Field and Pool KUPARUK RIVER FIELD KUPARfJK RIVER OIL POOL Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [~ Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] [] [] [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to hydraulic fracture and prop the Kuparuk "A" sand in well 1G-11. This treatment is expected to increase productivity from an expected 117 BOPD to 350 BOPD. The job will use 38,000 gallons of gelled diesel and 85,.000 pounds of proppant (70% 12/20 sand and 30% intermediate strength ceramic). Expected start date: 3-15-84 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title ~,~,1~ m-r,-'~,-r¢, ,",,"~r-,-r~,-r~ rn,-~ The space below for Commission use Conditions of Approval, if any: Approved by ~,pproved C ~,:: R. eturno¢ '" By Order of COMMISSIONER the Commission Form 10q03 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate KUPARUK ENGINEERIHG TRANSMITTAL TO' _ ~.~ FROM: WELL NAME- Transmitted herewith are the following- D. Fay Allison see below PLEASE NOTE' BL - BLUELINE, S - SEPIA, F - FILM, T - TAPE, PC - PHOTOCOPY Well Des~riptiqn Date Run ~iT ACKNOWLEDGED: RETURi~ RECEIPT TO- ARCO ALASKA, INC. .. ..... .. ATTH' D. FAY ALLISON - ATO/l115-B --. P. O. BOX 100360 ANCHORAGE, AK. 99510 ARCO Alaska, Inc. Post Office Bo,-, 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 January 18, 1984 Mr. C. V. Chatterton Commi ssi oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: 1G-11 Dear Mr. Chatterton: Enclosed are the well completion report and gyroscopic survey for the subject well. If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG: tw GRU5/L126 Enclosure ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA ~ :- AND GAS CONSERVATION Ci MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL Yl~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 83-131 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21008 4. Location of well at surface 9. Unit or Lease Name 327' FSL, 806' FWL, Sec.29, T12N, R10E, UM Kuparuk River Unit T ~------~.:._ :~. At Top Producing Interval OCATIO.,N$ I 10. Well Number 1517' FNL, 1307' FEL, Sec.32, T12N, R10E, UM ¢ '-" 1G-11 At Total Depth ! .~u:~._ i 1. Field and Pool 1752' FNL, 995' FEL, 5e0.32, T12N, RIOE, UM i:~.,H.__ _~..--i Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Kuparuk River 0i 1 Pool 99' RKB ADL 25640 ALK 2571 · 12. Date Spudded 13. Date T.D. Reached 14. Date cOmp,, Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions 09/07/83 09/15/83 12/23/83 N/A feet MS L 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+ l-VD) 19. DirectionaISurvey 20. Depth where SSSV set I 21. Thickness of Permafrost 8208'MD,6918'TVD 8105'MD,6829'TVD YES IX] NO [] 1913 feet MDI 1500' (Approx) 22. Type Electric or Other Logs Run D IL/FDC/CNL/Cal/SP, RFT, GR/CBL/VDL/CCL, Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.5# H-40 Surf 106' 24". 212 sx CS II 10-3/4" 45.5# J-55 Surf 2352' 13-1/2" - 930 sx AS III & 250 sx f5 I 7" 26.0# J-55 Surf 8188' 8-1/2" 610 sx Class G & 250 sx AS I 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 7722' - 7676' .' 3-1/2" 7824' 7385' & 7796' 7590' - 7540' w/12 spf 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A 27. N/A PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD I~ I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. . CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. NONE .' ~'"'"" Oil ~ Cons Form 10-407 GRUS/WCl 3 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, alt fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Upper Sand 7484' 6308' Base Upper Sand 7720' 6504' See Drilling History for RFT results. Top Lower Sand 7936' 6685' Base Lower Sand 8069' 6799' I' 31. LIST OF ATTACHMENTS Drilling History, Completion Summary, Gyroscopic Surveys (2 copies) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Title .~r~ I"l~'{ll'~ng I:'nnr, Date ................ "' 2' ,/ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separatelv produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". 1G-11 DRILLING HISTORY NU 20" Hydril'& diverter. Spudded well @ 2030 hrs, 09/07/83. Drld 13-1/2" hole to 2375'. Ran 60 jts 10-3/4" 45.5# HFERW BTC csg w/shoe @ 2352'. Cmtd 10-3/4" csg w/930 sx AS III & 250 sx AS I. Bumped plug & tstd csg to 1500 psi - ok. ND 20" Hydril & diverter. Performed top job on 16" x 10-3/4" ann w/90 sx AS I. Instld 16" x 10-3/4" packoff & tstd to 2000 psi - ok. NU BOPE & tstd to 3000 psi - ok. Witnessed by E. D. Sipple, AOGC rep. Tstd csg to 1500 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - ok. Cont drlg 8-1/2" hole to 8208' TD as of 09/15/83. CBU RU & ran logs, DIL/FDC/CNL/CAL/SP f/8186' to 2346'. Ran RFT (results attached). Ran 194 jts 7" 26# BTC csg w/shoe @ 8188'. Cmtd 7" csg w/610 sx Class "G" cmt. Bumped plug w/2000 psi - floats held - ok. Instld 7" packoff & tstd. Displ top 300' of well w/diesel cap. ND BOPE. Performed Arctic Pack using 250 sx AS I & 97 bbl Arctic Pack. Secured well & released rig @ 0700 hrs, 09/19/83. HILL/DH49 10/17/83 RFT Results: HILL/DH49 lO/17/83 Depth 7542' 7553' 7578' 7604' 7605' 7567' 7682' 7700' 7718' 7712' 7712.6' 7966' 7972' 7971.5 7980' 7966' 7906' 7965.5' 7972' 7980' 7979.5' 7977.5' 7567' 7972' 7947' 7946' 7942.5' 7695' 7616.5 7617.5' Hydro Press (psi) 3369 3367 3375 3379 3368 3342 3405 3408 3409 3400 3396 3537 3521 3522 3515 3504 3530 3528 3524 3527 3524 3522 3346 3530 3512 3508 3333 3413 3418 3411 Shut-In Press (psi) 5 2958 2970 2959 3027 3450 3509 3609 2962 3510 3435 2979 3064 1G-11 COMPLETION SUMMARY ND master valve & adapter flange. RU Dresser-Atlas. Ran GR/CBL/VDL/CCL f/8078' - 1930'. Ran Gyro f/8050' to surface. RD Dresser-Atlas. Secured wel 1. Accepted rig @ 0900 hrs, 12/20/83. ND tree. NU BOPE & tstd to 3000 psi - ok. Perforated the following intervals w/12 spf: 7722 - 7706 7706 - 7686 7686 - 7676 7590 - 7580 7580 - 7560 7560 - 7540 ' n /2" TIH w/gauge ring/JB to 8101'. TIH w/wireline & set pkr @ 7796 . Ra 3-1 completion assy w/tail @ 7824', pkr @ 7385',& SSSV @ 1913'. Tstd packoff to 3000 psi - ok. Set pkr. Set BPV. ND BOPE. NU tree & tstd to 3000 psi - ok. Pulled "C" lock from SSSV. Pulled 1" dummy f/7323'. Disp well w/Kuparuk crude & diesel. Set 1" dummy @ 7323'. Set BPV. Secured well & released rig @ 0330 hrs, 12/23/83. GRU5/CSO9'tw . i iii.,.'i!.~ ~ ~ :.i: :!i~ill ~ ~ i .'.:i:~i:!:::i! kL F'ARUK ~'~ .' OCTOBER ~, 1983 dOB NUMBER AK-BO-30106 ALASK~ ~' KELLY BUSHING ELEV. = 99. O0 FT. :~:~:~:t: ~::.~t~:':"~':'::':~ ;:~' ':.' .~' "':,'~%."'~ ..',..,,' ~. 'b '.. , .........'.: ....... > ":': :"" · ~' ~' ~' *:"~,..'.'::': ..... :" :::~:::~u~ '~::<:' :~ :~f~',~:,:.:.:~ ' .... ':" '"'-:::'"'":" :": :':':::' ':"':: ' ::::::':" ':':': ;:':':::::":' ..... ::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::: ::":"'' :'":' ":~:~"::' ~'::'):::::~: "~':":~:' ::':"~'::~'~:~':~:~ :~":::: ::':':::' ':"::: ' ':'' : ':":::::,:,:, ::'.,'.' ';: :::, :::::::::::::::::::::::::::::::::::::::::: ~:':~:: g~:~'~:: ~:~:~:~:~.~u:~.<::~::~:.:~::::::..?~{~:::~`~{:~?:~.::~::::~.~:::~::: ..:~?.:::.,:,.::..:.~:~:~'...,,,::':;'.,:, :::::::::::::::::::::: :.:,.~'::,:; :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ,::::..,::.': ,.,: ::::::::::::::::::::: :::::::::::::::::::::::: '. ::. ': :' ,:: '. :, ::::::::::::::::::::::::::::::::::::: :,::~ :::': :::::::::::::::::::::::::: ::::::::::::::::::::::: :~::. ~:::~:~: :: :~::~: :::::::~::: :::: :'::::::::; ::: ::::: :::::'::::;:::: ~: ~:: ::::::::::::::::::::::::::: m ~,:::{::: ~:;:~,::::: ::~:~:,:::. ,:: ::: :~;;~:':}:~:~: ~::: ::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ,::. ::,':.;' : .. ' ' MEASURED VERTICAL' VERTICAL INCL'INATION DIRECTION SEVERITY RECTANGULAR COORD I NA'TES VERTICAL DEPTH DEPTH DEPTH DEC MIN DEGREES DEC/100 NORTH/SOUTH EAST/WEST SECT ION ~:: ::.: ~ ', :.:: f~: ',~: ::: :,: ~:~,,::::::::;:: :::::::::::::::::::::::::::::::::: :~ x;::::::: ;~ :~:::~ :::,~:::: :'.:m:::':::: ;: ::::::::::::::::::::::::::::::::::::::::: ;.-,f_.~o~,. : 300 300.00 201.00 0 7 N 47.60 N 0.09 0.91 N. 0.44 W -0.84 400 400.00 301.00 0 7 N &0.89 W 0.04 1.04 N 0.62 W -1.07 hh:~::.' : ';:: ~" :.' ?.. :: '.." '":~::~:~t~:~;~. ::~:' "."~:~~'""::'"" "'~:~: ........ :~:~:~:;~I~':"'"::~;~" :' '"::h.~t:~:?~u:~::~:"' '.:~::"' :"":~' ':~:.'".?~:~h":.,:~;:~ ~.:;~:~p".::.::h::. ':.:. '.:.~ ~::~h~:~:~:~ :~:~ h:~:..':;:::::.:h.."" :~:'."~ ::::::::::::::::::::::::::::::::::::::::::::::::::: :' :~:. :::::.'.'.::: .<:.' ~': :::;~.':.:::h '.:::: :~.. .. ' I 900 899.89 800.89 3 53 S 50.89 E 2.9~ 1.70 S 1.87 E 2.48 J 1000 999.43 900.43 ~ 53 S ~8.50 E 3.07 6.98 S 9.63 E 11.84 . '.:.:.".:::.;: :. :;' ;., s':.':,' . '.., :;:.:,~:.::.::~';,'.;:.':. . '":;'s'.',:.' ...L~:~:~?::~.:::~,,.. :--'' :"': :::'<'' ''";~;~;~::;'~' ':: '";~;:~:';';~''"'' ''"~X{~?.¢';" ':::">''' ''~::':' ' '':::*..' , ~..':'~X ":..:: ':~''":'.:~::'~:.~::::~'::~.::~:'~,"'':'.:' :';;',''':.:?' ::' :..~;';~:~:<:::;~:~'~:~:::::'''::,::"t': ~'','.'" : '::"t:: ~;~.--;'.:":"~:', .,'" ' ' ..:.::.:..:..o:::.:: ::~:...::...::.: .~ . :.:~.:'~;..~.~ ...... ~ 15oo 1476.78 !377.78 25 8 S ~2. ~9 E 2.54 75.08 S 132.69 E 152.42 ,' 1600 15~5.92 14~. · '- ' ~ ,~ _':100 1991.92 1892.92 31 36 S. 62.30 E 0.31 211.17 S 407.79 E 4~8.37 2200 2077.11 1978.11 31 33 S ~2.39 E O. 07 235.47 ~ 454.18 E 510. ~. ~ 2700 2~00.52 ~401.52 32 ~ 2800 2584.17 ~485.17 33 37 $ ~2~0 E 0.8~ 379.81 S 740.55 E 830.53 0 0 © KLIPARUK OCTOBER 6~ 1983 dOB NUMBER AK-BO-30106 ALASKA KELLY BUSH IN6 ELEV, = 99,00 FT, HEASU~ED VEBT I CAL VERT I CAL I NCL I NAT I ON D I RECT I ON SEVE~ I TY ~ECTAN6ULAF COORD I NATES VERT I CAL DEE'TH DEPTH DEPTH PEG . MIN DEGREES DEG/100 NORTH/SOUTF EAST/WEST SECTION . ..... ".~.:= ~ .......::,'~:.:::.::' .......................... ~:~ .......... ~ .................. ~:'.::~?:?.:~::~::,.:::'.:'":".~:..' ............ ::~ ........... :'.:::::~:::~m'.'.:~i ........ :::~ ............ ':::".~.'::' .................. ' .......... .=~.'~..:,'.~ ............ ~.'..::~::.~:¥:.:~.:::?.?::~ ................ :::::::::::::::::::::::::::::::::::::::::::::::: ::::~:.~::~:~:~?:~:..~?::?.~:::~::~?..::i~::~:i~:~:~:~:~:.~.~:.~: ~:::~?:~?.~:r.:~:'~:~::::~:~:: :~":'~:::~:~%~??'~:??'~:?'~?~?r:???~???7~m ' · ' :.~ ~'~?.~ ' "' ,:.::~:F .... ~]~F~::~?~'~ ...... ~:' <' ~L':~ ~:~:~ :~F.~h:'~ ~' .{::~F~?:, ,.:~'~':],.~:~t~,'~ ~,.:' .::~F ........ :'~:~ ' ':,.:~{~.~]~C:~::?~::'F:'""'h',',"~'":'~]~{~d~:h~[~'' "~' '~]'~ '~'~ '~ ":hh,,~ ~:':F,,:.,. ,,', :~: .... .~ '.' J 3ouO z994.7~ ~8Y5.73 . 35 3~ ~ ~z. 0 E 0.45 51z.1~ S y'~3.3~ E 1115 41 J 340~]. 3075.94 297~. 94 35 50 S 59.80 E 1.31 540.57 S 1044.30 E 1173.73 3~00 3477.27 3378.27 37 12 ~ 58.80 E 0.18 b~2.28 S 1301.00 E 1471.~1 4000 355b.72 3457.72 37 34 S 58 10 E 0. Sb 724.0& S .1352.75 E 1532.&3 ?'.~:::~:~::::~.?~:::::':~'~.:~'.~:.'~ ~ .~' :~:?~E~:~::~?~c~::~.~:~::~:~??~.~..~.~:~:::~~:~::::::~..~:.:~:~:~::?.~.~:~%~:~:~:~:~.~ :~:::~:~:~,~:~:~:~?,~:::~:'::':'.~':~p::::::~:~::~'~' ::.:: ~':: ~::: ===================== ::~ '~::~::~:: :~..~:'::: ~ :'::.::::::".::: .:.::::.:::.'...,~ ,~,~ ..... ~:,: ..... . -- 4~00 3947.1~ 3848. l& 39 34 S 57,&0 E 0.30 8~0.81S '1~16.79 E 1844.83 4600 4023. ~2 3~24. ~2 40 8 ~ 57.50 E O. 5~ ~25.20 ~ 1~70.88 E' 1~08.89 .:~.~¥'.: ,.. · ': .: ... ~:. p.~:.x,::.~:~..~,.:-.~x . ' ~: ~' :.~:.~.~x: . ... ..~ '.',' .~.'.,'.. :.~+:x.' .' ' ~: : ,". ~ ~ ~,~,~ ~o~,. ~ ~o. ~ ~, . ~ '"'~' ............... ~'~'~'~'~'i"~'"~O"~"~ .................................... 4 ~'~:~'~ ...................... ~'~ ~ ~i'~'-'~'~' ........................... i~ i-::.~"~ ~'~E .... ~'~ ...... ~"' , 5100 4407.12 4308.12 3~ 5~ S ~2.89 E 1.12 10~ 1.47 S 1~45. O~ E 222~. 57 ~I 5200 448~. 88 4387. 88 37 15 ~ ~3. 0 E O. 33 1118. ~0 ~ 1~8. 81 E 228'~. 75 ?~:?.~. ~. ~g.~:~? ,.~.~,~e~...~,~p~: %...~,.~......,8 .......... ~ .............. 21~8~ .' ~.~..:~ ..... ~ ...... ~41~ 10 5700 4878.50 4779.50 37 32 S 58. ~0 E 3.57 12~ 1 · 08 S 2275.12 E 25~9.88 5800 4~57. ~8 4858. &8 37 4~ S ~7, 80 E O. 54 1293.27 S .2327.04 E 2&60. ~& , 0 0 0 KUPARUK ALASKA MEASUREB DEPTH ,JOB NUMBER ~K-BO-30~O$ KELLY BUSH~N~ ELEV. = 99.00 FT. VERTICAL SECTION ::::)::~:.~:~.:.'~:::' ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ~.:.x.:.,. VERTICAL DEPTH OCTOBER 6, 1983 ,~. ~¥<::x...~:,:. .<:.:,.,,:?.::::~::~.,:..,.. ~:::~::~::;~:x:::::~:~:~:/::x.;~.~:~:~.~:::k~`~:~:~>:~:~x~:~:.:~:~x.`~:~.:~.~.~`~v~:`:~:~+~`.:.~v~A:v`.:.~A~:~:x~.v~ VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES DEPTH DEG MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST 6300 5349.10 5250.10 38 23 S 58,50 E / O. 71 1457.43 S 2591,29 E 2972.00 6400 5428. 92 5329. 92 35 40 S 57. 50 E 2.79 1489.33 S 2642.36 E oUL~'-' .... ?. 20 { 6900 5834.02 5735.02 36 X9 S 56.60 E 0.30 1~48.39 S 2888.51 E 3325.09 J 7000 5914.61 5815.&1 36 16 S 5&,30 E 0.19 1681,10 S 2937.84 E 3384.22> I 7500 ' 6321.34 6222.54 33 38 S 51.89 E ' 1.49 1849.96 S 3174.43 E 3673,93 ~ 7600 6404.67 6305.67 33 28 S 51 . 60 E ~ O. 25 1884.19 S 3217.84 E 3728.75 ' ::' :~:~ ~: '"~:'. · , . ':~:~'~'~:'~ .." :::'." '~ F::~?:.~ ' ~ ':' .... ~:~%~.:~:" ~'-~?~.. ·· '?'.~:. '" .~?: ....... ': "--' ':::~ :.~::~:~:?:::~:.~::'"'...='"'+.<:,~:~:~!:~:h:~ .......... :~:" ','~'.'"':~:~:~:~?~,'.:' ......... :~,:~.~>"~.:..'.',':,~" :~/:- ,:.. :.~.:. :,., ~, - ' :.,~:~.'.':::'":~.:~:~':t: :"~'.:.: :. :'. ~ - ..:..~:,::~::.::~.,... . ::..., .... ~:?: ..:.: - .:,~:~:~:~ ........ . .......... ..,::-:.:=:¥~: · ·. .~::.-' .... :.:~-' ':~:~:~.~:::~:~:~::':'":¥: ............. :~'?~:~t~s?": ..... '"':":: :~. '. '.' ~ ,,.::'.':.:~:..'~:.':~.~.::~:t~,.~, '":,'" '.::::?:','".":::' ......... ~:. ' :.. ,~.~; ' ~ ' ' . ;'.:...::::::?.'.:':.:..:.:'_'?::..:::.~,~,~ ~:.'::::::.~:h::~:~:v:'~::.~:~:':')~ :~:::=':::~:::~'.::::::::=.:::.:. ~ ~'.~ ~,:C:,~:=~:~;:~:~t~:~:~:~:::::~,:~"~:.'~::¥>~::~ ~ ::~:~.: :,::J~,:::h:~':h'::~:'~'~'.:::~,"::~:~:~::~:~:~:~:/'~V.~:. '~ `~:~::~:~:~?~%:~:~.~:~:~)j?.~..~`:~::`:~.`::`.~:~:~.~h:~:~`"~.:~:~::~;.~.`::.:` ~i.:'~: .:t i 2, :.~,-, ~ ~ ~ .-, ~ · · 31 S 54.30 E {.10 2031.43 S 3413.11 E 3971.90 8050 ~782 33 ~83 3 ~ 8100 ~825.1~ ~72~. 1~ 31 3. S 54.30 E 0. O0 204~. 48 S 3434. O~ E 3997. ~0 ,": · ' ~ .. { .~::~ . ~. ' '..:~'~: ~::=.' ...' . '=':. ' ':~%~]=~?~:~':~= ' ::~::~::=/=.~: '.'~.:~ ?~>~ ~:' " ".~.' ' ': ~ ~¥:' "'..'"'~'""~ '~?~(~j~=.~? '~?J~'~"':" ']~ ~==~"~="'".~ .............. ~'; ............ ~ :=.:'""'?:~::~=:~:??~=~ ........ i '"' )'~'"' :::'~= :~. ='"'~=" '" ' ; ' ~ ' ' , ' . ' : · .. ::~'::'~,.:.:~ . .-:.' :.:' :':~: , '~ :::':..: ,:.'.:, ,: .: .... :. ~...:.: :.~:: ...... ~.~.'....,,: ..~.~.,.~x.:.,.: .~,...~;.,: +. :. x.:'..' ~ .~ .',,:,...,~., :,.~x..::t:,'.....:~,~:,:,.::,::..,~:;:~:,~:?.'~"~':'~.~::.~h;L:~,,.: ~:)~:'t;:::%~;:~,:::.:~::~$:.:~?:~:~:~:~:::~:,:.~.~,~:x:::' :'::7 .:~.:,:'F:h.'. "::'. ,..::x.x,.:.::,...,~:.::..~.;., ,..~,.........:...,,...:...~,....,.,~ ............ . .... , ........... - THE CALCULATION pROCEDURES ABE BASED ON THE USE OF'THREE DIMENSIONAL RADIUS OF CURVATURE METHOD. · : . : · .: .,:... ::: ~.~:.~.x. :., , .~, ... , . . ..:..; .:..:.: ...: ::~::.:..~ .~ :<,~:~:;~,v:~:.::~:~.:~.:..::~.~::.::< ~,:..:,.:,-:F.::.:x:,:~ ~.,,~:;v.$x :~: ~:::.~. :~.~:::.:>,. ~x.~:p~.~:.x,. :.~:,u~:~.....+~.~.,~:,~L .~ >.,.,:.>~...~A'., ~:~.....,.....::..:,; x.... ,,,. ......... : ....... ~),..::. ~....::..,..x, :. ,::...: ,......:v,x:. ,:: . · .... . : ........ ' ,,~u~ ~ ~ = .......... ~,j: ~. '(~'+'n~'=:i' ':. ' ....... ',?' .~i':~'~"~::~i~?¥?h:~'~'~?=~?'"::¥1=~:~'~=~i~' =".'?,' '=-?'~ ~"=~ =": , ~' KUPARUK OCTOBER' 6, 198:3 ._lOB NUMBER AK-BO-30106 ALASKA KELLY BUSHING ELEV. = 99.00 FT. I'RUE SUB-SEA TOTAL MEASURED VERT I CAL VERT I CAL RECTANGULAR COORDINATES . MD-TVD VERTICAL L.-' ........~ ,-.c,, ,~'" :.! < _...:.. :. ::~!. ~`~..~..~.~..[~:::.:~::.~...~:.::~.:~:~:~.::.~;~:~.~:`~.~[~:~:[~][~[~:.~.~:::~:~[:.~:~.::.~:~:~:~.~.~;~:.:.~.~:t~..~:~:~:~:~.~.~..~¢~:.~:~.~::~:~:~:::.~ :~:ii :?.~i:~][~:,ir~ ~ii~'i"i 'i ?::: ~ ;i!:~'!'..?:i!i'ii!!:~::]iiii::iii:.::~!!i~iii:~i;:i! iiiii'i'!i!'iii!'[?: :'::'i::i'i'ii".~:!!'[':. ~i!~;i!i..;::i:?:~!.[.~i~:?~!~.:.i.:::.:.:~:~.:....~ii!~i.~..i.:~?~i:~;.:i ~:;.iii]i::!'i~¥.;:.i¥i :iii!:.:: _::~:~!:. :ii~ ii:. :: i ~: ::~i.i.:...:.i.:...:.:..i..::..:: ...... ~ :3oo0 ~749.47 m650.47 ' 431 · 75 S 840, 44 E 250.53 157.39 8C)00 ~7:39, ~1 6640.61 201~, 19 ~ 3392. O~ E 12~0.39 17~, O0 8208 ~9!7.68 6818.68 2079.00 S " 3479,31 E 1290.32 29.94 KUPARUK . ALASKA ..................: ::::::::::::::::::::::::::::::::::,, ;. ::x' .xx::,, ~:~ :: ::, :.::~ ~ ~ ~ ~ ~ ~~: ~x~::~x~:~;~:~:~::~:~ .. ,.:.. ........... ,,. ,-...:.:~...:.,,','.',.~ ....... ,.'.",:~ ,~ 1'RUE SUB-SE~ OCTOBER 6,' 1983 dOB NUMBER AK-BO-30106 KELLY, BUSHING ELEV. = .99.0A ~T. TOTAL MEASURED i VERTICAL VERTICAL RECTANGULAR COORDINATES . MD-TVD VERTICAL o ......................... ................. !Ii i!l .......... i il i ¢ii; ' Mm V~ ~ 1.9 :__199. O0 100. O0 O. 68 N O, 26 W O. O0 O. O0 299 2~9,00 200.00 0.91 N 0,43 W / 0.00 0.00 ................... ; ..... . ............................... ~-~ ............... ~.,.~ .~ .~ ............... ~ ............... ~ ..~ ...... ~.... ......: ......... ~ ~...~...,..~....~.~ ......................... ~...~ ........... ~::,:~:. ~ ....... .......................... ~99 .................. ~ ................................... ~ ........ ~ ....................... ~;~ ...... ~,. , ............... ~, ~ ~ ~ I ~ V~w~ ~wV ~ ~ ~1 lq ~ ~ ~ ~ ~I ~IV .... V'~'~ ............................................. '*'" '"""" ' ':' ~'" ...... 799 799.00 700.00 1.1~ N 1.80 W 0.01 0.0 899 8~. O0 800. O0 1 · 67 ~ I · 88 E O. 11 O. 10 ~?:~:::~?:~.~.:.~:~i::??~.~ ~,...0'~;~i~:~?:~; :~::. :::~'~ :.: ............ ,.~ '.:. ........ ;~i~,~;~:~:::'~ ............... .~;:. :~:~:'?'"':'".~'~?"~:~, ........... ~i~'' :~: .- .~? '~:.::~~::~::~ ".~ .::~:.~:~?.' ........................ ::~? ?:?:~?:~%~?.~?~,'.~: '~' ~ ~' ~.~,~ ~v.~ ~ ~.~ ~ ~ ..................................... ="-'~-~-~ .......................................................... 1~41~ 1399.00 1300.00 58.77 S 101.91 E 15.76 7_1~. - 1 ~24 1499. O0 ~ ~00. O0 79.88 S i 42.22 E 25. ~5 , 9.90 ...................... ~ ................. ..,- · ~ · ....... ~.~,?~.~ ....... ~ ....... , ...... · ..... ~..~ .... ~.:~..,.~.., · .... .,... ~.....:.x ·. ~:.-.+ ~, x..~:..~ ~.,.,L~...~,, ,... ~,....~. ~.~.~, .. ~,,..~....~...x....~. ~..,~,,.,.~ ....... · ............ . ,..,...,:.,.,,.. . , .... . .,~....~ , . ....... . ..... ~ ...~. ~.~ ...... . .. ........ : ...c...~.~::?..,~ ....... :~.~.~w.~ .::~_~.,::,.~:. :x~ ~:~,~.~x,...:~:...~,. ~ ,........ ....... ~,,., .x.....,,~...., :,:~: ,,~x,:.~..~.~,~..~ ........ ~ ...................... . . ...: :..~. · : .... · '~ '. '-' '. ' ~'"..::.~:~:~.~:~::,~' ........ . *':~.~..,:.....:.:: c~?'.. .................. ..~?.'?",'~ '~:'~:~=~:~ :~ '. '...~ ~ ......... '~. ~?: ~ : ~.~ .~.::'~,~:~:~:~:.:~t~:.~'~:~:~.~:~:: ~.~:~:~ ~:, :~': .' ::~ "~:.~ ':~"~ ~.'~ :.~:~:.~ ~. ~ :.~":~:.: ' : · 0 O o ~~"~~ ('~E¢::~:"~- :~'"'"' ~ T~., ~"":':"~"i':~'~"~ ....... :'"~' '~'~:' ''''~:'' '~':' ':~ '':''~ ':~'' '':::'~:~ ':~:'":"?:":":':~'?':':~:~::: ~::::":C ~~~:: :':~'~T ~ :::::~:': :::~ :::::":::":: ::::::::::::::::::::::: ::: ~::::: :::: ::~:: ::: ::: ::: :~::::::::: :::::' :'~:: ::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::? ::<'::::::: :: :: :' ? ::: :: :' :':: :: :' :: :: :<: :?:-: ::: :::?: :": ::: ~ KUPARUK OCTOBER ~ 1~83 dOB NUMBER AK-BO-30106 ALASKA KELLY BUSHING ELEV. = ~9.00 FT. :.:~:~ ::::::::::::::::::::::::::: :: ,x: ,.::,,:: x::x, ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ,,:h w ::;:>a:x :::~/<:~ ::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ,c~c: ~x?., ;~. :'' , ]'~UE SUB-SEA TOTAL MEASURED VE~T I CAL VE~T I CAL RECTANGULA~ COORD I NATE~ . MD-TVD VE~T I CAL :, :. , , _~ ~o- ,....:'.'-. ........ ~..~'.'.'..:,,..~.~?~:,?.::::..?::.,:.:::.:.~:::~::::::::::::::::::::: ........... ....... ~`~.`~..?`~``..`~.~`:.~?..:``~`~``~:~`~`~`?`~:~.~:~:~?.~:~.``~`~.~~. ............................................. .~ ........... .:.,.,,.~? ....................... ~ ........ ~ ..... :::.?.~::j~,.~.a~:.~,:.., ....................... .. .................... . ....... , :::: :: :j~J:~[ : : ::: :~[~ 2225 2099,00 2000.00 241.70 S ~66.09 E ' 126.69 17.38 2343 21 ~. O0 2100. O0 26~. 9S S 520.72 E 144.08 17.40 -<, ............................. ~4a,I ................ JP-~~~'-: "-~ ..... ~.~ ~ ~, - ==, ~, ~ ' ,,~ ~ ,~ -, ::::::::::::::::::::::::::: ~:::' ':, .~ '. : :..> .:'::.i~:F:~',:::'.:':~,~:t~h,~: .... :'~:,'<:~S:~E:~<~:~..~:~:~] ~:' F:~}N~.:. ::::':: ' ::~:::~:~' -7 s~. /-:'::. ~: ~:, ',' ~:~:' "::~::-:',v~--~,~4~:~ ~ ..... . .. :~m,SM.)>~..-:>~:.r.~is~4.x,..<.. ,< .~-,.%~ ,:..~,i:.,,,~:~.+~..~.:~.~,~.:~.~.~ ~ ...... .:~:~,'. :,: :.,: ':,.. ~ c. '?.:,i:~'~: .: 'X ~ '".= < ;:::::b~:::S~b:~GSG: '. ..... :~,..: ;:i:. :=::~::::;::W~:::=?.:~? . ~' <~,, ' '~'. ~,.S,,~a:i,.::s?.~:.~ab:~=?,P~::S :': ' '::~=:::<< '.,:, ~,:,~=~=:: ,:.c~G=:...:~,:.::,.?,i::::'::~' ~' i::s:=:~', :::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ..,:~: ::::::::::::::::::::: .:. :::,:" ......................... ~ 8'~'7 ......................... ~5~';"'~ ~ ................................ ~0 ~':"::~ ~:~'~'~': .................... ~'~:~:'~'~ ::' ~?'"::::~ ......................... : ................. ~-~ e?':~:"~:~:~::?'::::~:'~ ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~ :,::''::: :: :'. :":~:, :::::::::::::::::::::::::: :::::',":'.:,,,':::::':~: :.::: ::: ........ :. 2~88 2~, O0 2~00. O0 a 15, a l S 809, 4~ E 239. aO 20.80 3060 2799. O0 2700. O0 447.73 : ~i::::: ,.:: :...:: ..:::~: :. :~-: .: <... :: .:. ~ ..... :....' ':3::: :::: ~ i::::::~ ~:~":~: ~ :~:~. :'s ::~: ~:~'~:~:~ ~ '~ ::~ ~ ~: ~/~:~:~~ ~ ':~'.~ ~:. :..' .:'.':~:.': .::' ::: :: ~ ~' ~..::::':::::::::~::: .......... :' ":?:'.~ ................ :::::::::::::::::::::::::' '>:" '>'>'::'..:::,-.:':?'"<'~::~:~..~:~:~:> ~>:.. ~,,'.':', ..:~::. :~.:::,."~ ~::b:'. ::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::: ;~. >::' .::.':'.:::~::::: h~:&~>~.:..~'.~?::...:h~.:, .~:~<::~:~::.:~:~::::::~:::.x:.:::'~.'.-....:>.:~':~$~:~..~):8~ ~ ~.~':~..~ 3676 3299. O0 3200. O0 &23. O0 S 1185.54 E 377.59 24.56 3801 3399 O0 '~'~ ' · ooOcl. O0 661.63 $ 1250.09 E 402.73 25.14 .. :..... :,- . ::: . ..: ::.: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ==================================================================================================================================== .::.:::::.::::.:~::.~::.::::::::~:::::~::::::~:::~::~:;:.:::.:::::.:..:~:::~:.:.:.:::~.~::::::.::::::~::::~:::::.:.::..::::::::::::::.~:~:.:..:::~::::::::::~::::~::~:...:::::::::~::<~:::~:::~::::::.::::::::::~::::::::::::::::::::::::::::::::::.:.:::::::::~:::..:::::::::::::.:::::...::.:~::::::~.~:::.::>.:.::.::.::::::.:::::.:.:.::..::::..::::::...:::.:~.:: .: :: ,. :::. . . :.,. :::..: :::::::::::::::::::::::::::: :: :::::':,'::: :: :-: .-.,.-:... :. :::: :. ::::::::::::::::::::::::::::::::::::::: =========================== :, :~. ,. ::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: .... · ..:: ...:: :.::::: .::.:::.:...:.:.::::::. ::::::: :.:a:.:,::::,:.::..::.. ::: .. :.:: i::: :... :.:.:.:.:.::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::: ::'i:.::.,:::: :::~:::~:~::::::::~:~:i:8::~:~:::::~:~::~i~:::::::::~:i:::N::::~:::::::::::::::::::::::::::::::~a:~:3~:::~: :::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::: KUPARUK ALASKA ]'RUE SUB-SEA MEASURED VERT I CAL VERT I CAL ~ .*. ' ~ ....i. ' :'i~ ~ ,~: 'i::i:iii!::.::i:'!i!i?!::i{i:'.ii:iil!i!ili?i:.i:: L. UI'I~UIHI ZUI~ L'HI~ OCTOBER 6~ ~9S3 ~iiiii~i ii;! ii~i=:i:':':": ::ii:?'::!:: %?ii: i!:.. .......... ~'~': K'; 'i'.::.N. ii: ii ? i i il' !''': ........... O:!'!:':':ii~".: ii i ii?!r:':':?~::::::::::::::::::::::::::~ ~ ~iiiii!i: 'iii:i i~iiii~ ........... TOTAL RECTANGULAR CO'ORBINATES !i;'.:DS:Yg'::: OE::?.,O..U.R~E..,Y;: :::O~TOBER:;~' :,5 ,::',:': 1983 dOB NUMBER AK-BO-SO106 KELLY BUSHING ELEV. = 9'2.00 FT. VERT I [:AL 4.567 3999. O0 3900. O0 913.91 S 1653.16 E 568.41 29.84 469S 4099.00 4000. O0 959.55 S , 1724.60 E 599.51 ,31.10 5341 4599. O0 4500. O0 1157.91 S 2075.81 E 742.50 26.28 5469 409~. O0 4600.00 , ~ 193.88 S . 2146.82 E 770.32 27.82 6107 519~. O0 5100. O0 1393.82 S 2488.68 E ~08.37 27.77 ~235 529~. 00 5200. O0 1436.53 S 2~57.30 E ~36. ~ 28.5~ i;i ~: , ,~,,, , , ,,, , ............ ::,:::. :::', .... : ........ .i!.i:".'.ii'il..:::ii~if:'?:.':::~.:::': !:': ........ ::' t(UPARLIK ALASKA 'i:Li:!]!iii;.:i:::?.[ih::ili..i.!!illi!itilit!I:J.:it::iiJ..ii~ !!}i!!!::ii!~!:!ii:.i:'..'.i:!~:~!:::!!~;':?irl;:i!;i:'..:i~,'Fi iE ~.'.; ..'..}i .~ '. : i.i .:. k:.".'.:h: i i ........ . .. : TRUE SUB-SEA TOTAL VERT I CAL VERT I CAL RECTANGULAR MEASURED 67:32 6980 7104 1983 ,JOB NUMBER AK-BO-30106 KELLY BUSHING ELEV. = .~9.0C) FT. ,;,: .......... :...:,::,~:, ,,, ,:.:. x,,,:.::,;,,::;,,,,;.~.,:,:::.:,,;,,:,:;:. ;.~:`.:::~::.~:.::~..:::;:::;~.:.;::::.~:::..::.:~:::~.::~.~::~:~.~..:;~:i.::.:~:::i:E:{.~` ,:: .i E,::i: ;L::~?, :i' ,', ':::: !;::~..::i~..~::::~.~.:~:::i.:.~i~i;~i;i~i~:::iii~ii~..ti~i:~i::.i:~r:~$:::~:~ ~:':~J,.:~i i:~?.;~'::[;]j:,:',~ ~':~.::,.:, . ' :: ] .::; COORDINATES. MD-TVD VERTICAL 5899.00 5800.00 i674.75 S 2928.31 E 1081.63 24.10 5999. O0 5900. O0 1715.82 S 2989.09 E ' 1105.66 24.02 7713 ~.499. O0 6400. O0 1923.08 S 3267.42 E 1214.45 20.24 7833 6S~, O0 6500. O0 1 ~63, 38 S 3320. O~ E 1234.44 1~. ~ THE CALCULATION PROCEDURES USE n LINEAR INTERPOLATION BETWEEN ' ::::I: . : I ;: I ,. :: , .... , .. :: I: . . : ;.; ~:~,~:~;:: :~ .;?: :~:: :; ;::,, ~t: :.: ;::: . ::::::::::::::::::::::::::::::: :::::::::::::::::::::::::: ::~ .:l~:~: I ..::: i ~, :: :], I :~:~:; ~:::~ :~ :~I:i];:I <~:l:t i ~:::i::: :I :~ ~::: ;~: ~::~ ~ l::~:~<~::~:~l~:~t ~:~ :. :ll:::t ;i:: :~.:~:~:::~:I:: ~I,.~ ~ :~:~:~I::~ ~: ~ :~ ~: ~ ~: :~::: :~; I ~ ~ ~ ~ ~; ~ :~ ~::: ~ ~ ~z:: ~ ~ :~t ~,: :~:` ~: ~ ~ ~ ~ ~ :~ ~ ~ ~ ~: ~ ~ ~ ~ ~ ~ ~ t ~ L~ ~:: ~; ~ ~ ~:: ~ ~ ~ ~: ~ ~: ~ ~5 ~ ~ ~ ~ ~ ~ ~ ~: ~: ~{: t ~t:- ~ ~ ~ ~::: ~ ~ ~ ~: ~ ~ ~ ~ ~;i: .... · .: +:.~.:~: .. .... © 0 OCTOBER 6, 1983 dOB NUMBER AK-BO-3C) I£)~. , KELLY BUSHING ELEV. = 99.00 FT. ~ ' :':::: .".' , !' :.:' ::; :' :: :" :'"::':' ::':::: ~ :'::~ ~ :! ::¢::'?.~: !~ ' ~:l~:: ;;:,'&t~.,:i; :::: . ~ ~:!::: :;: ~::~ ~ ::,.:%~: :::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::: ::,,::::: ¢;:;;:::::;::,.:::,,,:~:~.:,.:;: :::'.:'.'.::::,.'~:;:'"::: :::; :':::'x : . ' . ::':::,: .: :::::::::::::::::::::::: :::~: ::::::::::::::::::::::::::::::::: . :x:'.,:~: :":.: ,,: ,, :'.::,:: '.,,: :::,::::::::,.::':: ::::::::::::::::::::::::::::::::::::::::::::: :.:,'," :'' · ,';::'.: .:::.,'..: ::::::::::::::::::::::::: . :::::'?;': ';~':' ,~:: ,,:t.,:,,,t:.. :}~}: ::::::::::::::::::::::::::::::::::::::::::::::::::::: ,,: ,~: ,:.,:,;:}:. ,,: ,.,:: ~ ~::,.:::,,., :: ,:::? ,:. ,:.~ :::: ::: :>: ,,, :::, , · :.,, '.,, : , ~ 7936 6685.23 6586.23 1996" 30 S 3364.81 E TOP LOWER SAND ' J 8L 5o 6782. ~ 668~. 3~ ~0~ 1. ~ ~ ~413.11 E SURVEY DEPTH ;'~.'s ":: h?'.'c:~,. ~::::.~,t ' ~. ~:~:~.:~:~:~::.~:f~:~.~:.::~:~:~::~l~.~:~:~::~:~::~::::::~::~:::~~ .. :.~ r..~ .....:.f;:i~ ~:~::::~:.t~::~:~;':?~'~:: '" ".' '"~':':;~P'?F' ~.~ ~:~i::~?~::~?~.~;~j}~:~;::~?~.t~::~?~?~~ '"~{¢:~y~:~:~ ~ ...... '"::: ....... :'::~ "' :"' ':?'" ":~::~:~Y~;:'~'"'"':'" ....... :~:~:"'":""~?:~:.~.~?.~7~;~;:::'.i~:.?~;:~':~Y:~ ~ ~~::~:. ~~ ~'~ i:::,~1~::~~'"': ~ ..... i~ '"': ..... ::' "~;F:~:' .' ' '.~} ;: ~ '~ ; .~ '-.: ":. ';: . . ;. · , :.:~:,,~:~.:~:.:;:~:::::x:.,'.~:~ :~<~:× ================================== ';': p,:.,'~,;:;::;.,. ::;~;.~:~:~'.': ~.~:~.?;:;:~, ..~..&¢:~:.~:, .~ ~...::::~;~:::.:.;::~;,~:~~:~.r::~:,: ::.:;:::,;,,,..:.~:,:¥::' :x: :,,: ..... ~. ~. ~ ......... ~ ~ ~ ~ ........ ~ ......... ~ .................. ~.....,~ ..................................... ~,~ ,~.~... ~.~ ........ ~ ......... :~. ............... ~..,..., ........................ ~:.:::.::~: .:~:~:::~:%~:~,~:d::~:::~;:~:~..:~:::~¢~::::,:, ::.:.' ::' ::::,;::s:.s ::;.::;:~:~:~:~.~.~:~ ~.:;:: ~u:::%::~:~ _::~::: .:::::~: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::: ::::::::::: ~::::~s :~ ::::::-': ~ ~ ~:~ :: ~::: ~: ~:::::::::::::::::::: x;:..::::: ~:::: ::::: 2':' ~. ~:~:~.~,,:::.:: DERIVED USING D IL DEPTHS AND SPERRY SUN SURVEY DATA TOP UPPER SAND 7484 6308.02 6209.02 PBTD 810~5 6829. TOTAL DEPTH DRILLER 8208 :::::::::::::::::::::::::::::: ....... :,:::::::'.:::::::',::~::~:::¥:::::::::::::::::::::::::::~:::::,,:::::::.:,. ~:::~:~::~i::~:~:~::~::~::~i::::,:~i?,~:~:~:~i:i :]:~:i:]:~:i:~:::?~:]{:~:~i~:i~:~:i.~:i:i~:i:i:~:~i: 2047..9.9S 34:i:6.15E 207.9.00S 347.9.31E -50~.00 TBUE NOAI'It Surface Location 327 FSL 806 FWL 5oo'. oo ,°oh. oo , so{o. oo zooo. oo ~'dh. oo --500.00 --1oo0.00 --150o. 0o --2000.00 --2500.00 HORIZONTRL PROJECTION 300~.00 I ARCO Alaska~ Inc. Job No. AK-BO-30106 Well: ~1G-11 (~EC 29 T12N R10E) Kuparuk Field North Slope, Alaska Survey Date: .October 5, 1983 Operator: Samec Scale: 1'+ = 500" C~ ARCO ALASKA, INC. Our Boss Gyroscopic Survey Job No. AK-BO-30106 Well: ~1 G-ii (SEC 29 T12N R10E) Kuparuk Field North Slope, .Alaska S~urvey Date: October 5, 1983 Operator: Samec Scale: 1" = 1500' O. O0 ~500.00 3000.00 4500.00 6000.00 7500.00 4053.12' @ S 59° 8' E ~5~0. oo 30bo. oo 45b0. oo VERTICRL PROJECTION ' Suggested fOrm to be inserted in each "Active" well folder to d~,eck for timoly ccxnpliance wi~. our' regulations. ' ' Operator, t~e~ll Name and Number . Reports and Materials to be received by: /-' ~ Date Required Date Received Remarks · _ - . , Completion Report Yes /_ /~._~. ~,~.:,~.. . Well History Yes -.. _Samples p/ ..... ~ ,., ~ , Mud Log .~, ~? · ,. Core Description Registered Survey Plat --~- ' · Inclination Survey , /?~. ,., {/.f-. [.~2.,' Directional Survey ~/~:..,_ ~ (___f) /,; Drill Stun Test Reports .,4/:~ .//,~:e_ - ~' ... . ProdUctiOn Test Reports : C~ /--/?-~'~ ~:' ?'~,' ,:._:./:. ..~:~s. ~ ' ~ 1 2, - / ?. -:?~'~ . Digitized Data i~ .,. '?'\ .... ~ J 2--~ ?-'~,3 .,,~-'. · .,. ARCO Alaska, Inc. , Post Office Bux 100360 Anchorage~ Alaska 99510 Telephone 907 276 1215 January 18, 1984 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: 1G-11 Dear Mr. Chatterton' Enclosed is a Subsequent Sundry Report for the subject well. you have any questions, please call me at 263-4944. Sincerely, ~. Graber Associate Engineer GRU5/L121:tw Enclosure If ARCO Alaska, Inc. is a Subsidiary of AtlantJcRichfieldCompany STATE OF ALASKA ALASKA . _ AND GAS CONSERVATION CC .¢IlSSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] coMPLETED WELL []X 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 83-131 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21008 OTHER [] 4. Location of Well Surface: 327' FSL, 806' FWL, Sec.29, T12N, R10E, UM 5. Elevation in feet (indicate KB, DF, etc.) 99' RKB 6. Lease Designation and Serial No. ADL 25640 ALK 2571 9. Unit or Lease Name Kuparuk River Unit 10. Well Number 1G-11 11. Field and Pool Kuparuk River Field Kuparuk River 0il Pool 12. (Submit in Triplicate) Perforate [] Atter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonmentsee20 AAC 25.105-170). ND master valve & adapter flange. RU Dresser-Atlas. Ran GR/CBL/VDL/CCL f/8078' - 1930'. Ran Gyro f/8050' tc surface. RD Dresser-Atlas. Secured well. Accepted rig @ 0900 hrs, 12/20/83. intervals w/12 spf: 7722' - 7706' 7706' - 7686' 7686' - 7676' 7590' - 7580' 7580' - 7560' 7560' - 7540' ND tree. NU BOPE & tstd to 3000 psi - ok. Perforated the following TIH w/gauge ring /JB to 8101'. TIH w/wireline & set pkr ~ 7796'· Ran 3-1/2" completion assy w/tail @ 7824', pkr @ 7385', & SSSV ~ 1913'. Tstd packoff to 3000 psi - ok. Set pkr. Set BPV. ND BOPE. NU tree & tstd to 3000 psi - ok. Pulled "C" lock from SSSV. Pulled 1" dummy f/7323'. Disp well w/Kuparuk._ crude & diesel· Set · .. 1" dummy @ 7323' Set BPV Secured well & released rig ~ 0330 hrs, 12/23/83. 14. I hereby c~,-tjfy that the foregoing is true and correct 'to the best of my knowledge. Si~ned _~ _ ? Title ^rea Drilling [ngineer The sp ission use COnditi~s of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date ......... Form 10~03 Rev. 7-1-80 GRUS/SN59 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office Bo,, 360 Anchorage, Alaska 99510 Telephone 907 277 5637 January 5, 1984 Mr. C. V. Chatterton State of Alaska Oil and Gas Conservation 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton' Commission Attached are sundry notices for wells' 1G-9 fracture 1G-9 perforate 1G-10 perforate 1G-11 perforate 1G-12 perforate 1G-13 perforate 1G-14 perforate 1G-15 perforate 1G-16 perforate action on the fo1 lowing If you have any questions, please call Kuparuk Operations Coordinator CKH/kmc Attachment (In Triplicate) me at 263-4527. ARCO Alcska. !r,c. is a subsidiary of AtlanticRichlie!dCo~npany STATE OF ALASKA ALASKA ulL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] 2. Name of Operator 7. Permit No. ARCO ALASKA, INC. 83-131 3. Address 8. APl Number P. O. BOX 100360, ANCHORAGE, ALASKA 99510 50-029-21008 4. Location of We~l 9. Unit or Lease Name SURFACE LOCATION' 327' FSL, 806' FWL, SEC. 29 T12N, R10E, UM 5. Elevation in feet (indicate KB, DF, etc.) 99 ' (RKB) 12. KUPARUK RIVER UNIT 10. Well Number 1G-11 11. Field and Pool KUPARUK R!VER FIELD 6. Lease Designation and Serial No. KUPARUK R[VER O! L ADL 25640, ALK 2571 PO(Pi Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate )~ Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to perforate the following depths in the Kuparuk "A" sand: 7960'- 7982'. All perforating will be conducted with 4 SPF through-tubing guns. A 3000 psi lubricator will be used on all wireline work. Lubricator will be pressure tested prior to doing the work. All circulated and flowed fluids will be diverted to tankage on location. Expected start date' Subsequent Work 7Reoorted~ 14. I hereby certify,t/hat the foregoing is true and correct to the best of my knowledge. Signed ,////~,/(_'r'~_,~-~,,_/~,~---- ~ &~/'~fl-.1~ Title KUPARUK The space%elow for Commission use OPERAT ! ONS COORD ! NATOR Oate Conditions of Approval, if any: Approved Copy ~ .... By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate KUPARUK ENGINEERING TRANSMITTAL WELL NAME' Transmitted herewith are the following: PLEASE NOTE: BL - BLUELINE, S - SEPIA, F - FILM~TAPE, PC - PHOTOCOPY Alaska Oil & Gas Cons Commission Anchorage PLEASE DATE' R~EIPT TO: ARCO ALAS~. ~ AT~.. FAY ALLISON - ATO/1115-B · K1.Jp,,\~< EN31NEER I h~ TO: V-/i l ! i am VarAl en DATE: /~_.-- FF..A: D.W. Bose/Shelby J. Matth~,/s Transmitted herewith are the fol le, vincj- PLEASE IxDTE: BLUEL 1 NE SEP ! A, F - Film;l, T - TAPE, PC - PrDT(XZIDPY · . /,~ AGbtNFg:,q FrG~: v PLEASE P,h--i',U~N P4ECE I PT 'II): KUPARUK F-J',G I I'-,'.EER I KG 7PYNNSMITTAL E ~.6~ TO: DATE: FR~vl: D. W. Bose/Shelby J. Matthew, s' Transmitted herewith are the follc~wincj' PLEASE NOTE: BL - BLUELINE, S - SEPIA, F - FID.4, T - TAPE, PC - F~PY. ~ 81o / ~ R'//-/ ' g, ,9 /, ?¢ o/// 6 ¢ 77 L~ o//4 ,C~IPT ACJ(NC~.VI FI'GFD: · /~~E P,E-R~N RECJE ! PT TO: ATTN: SHELBY J. M&TIHD/,,~ - ATO/1115-B . P. O. BOX 100360 ' ANE:I-~E, At(. 99510 ARCO Alaska, In,._ Post Office Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 October 15, 1983 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton' Enclosed are the Monthly State Reports for the following wells' 1G-10 1F-10 1G-11 1F-11 1G-12 1F-12 1F-9 1F-13 Thank you. Sincerely, in 'A~~ t t~c/~~ t Drilling Engineer JBK/SHiO' sm Enclosures ARCO Alaska. Inc. is a Subsidiary of AtlanticRichfieldCompany ;- - STATE OF ALASKA ' ' ALASK~~-'''AN D GAS CONSERVATION C'~-"IlSSION N"/~S~ MONTHLY REPORT ur: DRILLING AND WOFIf OVER OPERATIO Workover operation [] I 1. Drilling well [~]XX t~ I 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 83-131 3. Address 8. APINumber P. 0. Box 100360, Anchorage, AK 99510 50- 029-21008 4. Location of Well at surface 327' FSL, 806' FWL, Sec. 29, T12N, RIOE, UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. PAD 63' qq, For the Month of 9. Unit or Lease Name Kuparuk River Unit 10. Well No. 1G-11 11. Field and Pool Kuparuk River Field Kuparuk River 0il Pool ,19 Rt 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spudded well ~ 2030 hfs, 09/07/83. Drld 13-1/2" hole to 2375'. 10-3/4" csg. Performed top job, Drld 8-1/2" hole to 8208' TD. Ran, cmtd & tstd 7" csg. Displ top 300' of well w/diesel cap. Secured well & released rig ~ 0700 hfs, 09/19/83. SEE DRILLING HISTORY Ran, cmtd, & tstd Ran logs, ran RFT. Performed Arctic Pack. 13. Casing or liner run and quantities of cement, results of pressure tests 10-3/4" 45.5// HRERW J-55 BTC csg w/shoe ~ 2352'. Cmtd w/930 sx AS 7" 26# J-55 BTC csg w/shoe ~ 8188'. Cmtd w/610 sx Class "G", II I & 250 sx AS I. , 14. Coring resume and brief description N/A 15. Logs run and depth where run D I L/FDC/CNL/CAL/SP Ran RFT. f/8186' to 2346'.. 16. DST data, perforating data, shows of H2S, miscellaneous data N/A 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. NOTE--RepOt o~thi~,~ is required for each calendar month, re~';d~'ess o~ 'the states'of ~t}~'6~, 'and must be filed in duplicate with the Alaska Oil and G~' Conservat~n Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 Submit in duplicate Rev. 7-1-80 1G-11 DRILLING HISTORY NU 20" Hydril & diverter. Spudded well @ 2030 hrs, 09/07/83. Drld 13-1/2" hole to 2375'. Ran 60 jts 10-3/4" 45.5# HFERW BTC csg w/shoe @ 2352'. Cmtd 10-3/4" csg w/930 sx AS III & 250 sx AS I. Bumped plug & tstd csg to 1500 psi - ok. ND 20" Hydril & diverter. Performed top job on 16" x 10-3/4" ann w/90 sx AS I. Instld 16" x 10-3/4" packoff & tstd to 2000 psi - ok. NU BOPE & tstd to 3000 psi - ok. Witnessed by E D. Sipple, AOGC rep. Tstd csg to 1500 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - ok. Cont drlg 8-1/2" hole to 8208' TD as of 09/15/83. CBU RU & ran logs, DIL/FDC/CNL/CAL/SP f/8186' to 2346'. Ran RFT (results attached). Ran 194 jts 7" 26# BTC csg w/shoe @ 8188'. Cmtd 7" csg w/610 sx Class "G" cmt. Bumped plug w/2000 psi - floats held - ok. Instld 7" packoff & tstd. Displ top 300' of well w/diesel cap. ND BOPE. Performed Arctic Pack using 250 sx AS I & 97 bbl Arctic Pack. Secured well & released rig @ 0700 hrs, 09/19/83. HILL/DH49 10/17/83 RFT Results' HILL/DH49 10/17/83 Depth 7542 7553 7578 7604 7605 7567 7682 7700 7718 7712 7712.6' 7966' 7972' 7971.5 7980' 7966' 7906' 7965.5' 7972' 7980' 7979.5' 7977.5' 7567' 7972' 7947' 7946' 7942.5' 7695' 7616.5 7617.5' Hydro Press (psi) 3369 3367 3375 3379 3368 3342 3405 3408 3409 3400 3396 3537 3521 3522 3515 3504 3530 3528 ,3524 3527 3524 3522 3346 3530 3512 3508 3333 3413 3418 3411 Shut-In Press (psi) 2958 2970 2959 3027 ~m 3450 3509 3609 2962 3510 3435 2979 3064 MEMORANDUM State of Alaska ALAS¥~A~,?IL A~D GAS CO~SERVATIO~.,- COMMI$SIO~,~ TO~ C JV./~.tterton DATE.' September ~r-') - FILE NO: 108A:E1 T~RU: L~nnie C. Smith C~missioner~' ~ TELEPHONE NO: FROM: Ed~r W. Sipple, Jr~~ SUBJECT: ~tro~ I~ctor~ 12, 1983 Witness BOPE Test on ARCO's Euparuk 1G-11, Sec. 29,T12N,R10E, L~4, Permit [~o. 83-131, Doyon Rig }~o. 9. Fri.d..ay, Sept_e~..~r 9, !983.: I traveled this date from ARCO's CPF meter proving (subject of anoth, er report) to ARCO's 1G-11 to witness a BOPE-- test. The drilling contractor, Doyon Rig ~.~o. 9 was in the process of nippling up. The BOP~ test c~m~nce~ at 3:30 pm and was concluded at 6:00 pm. There were no failures. In summary, I witnessed the BOPE test on ARCO's Kuparuk 1G-11, Do~n Rig ~o. 9. Attachment 02-00IA(Rev. 10/79) o&d , 4 4/80 STATE OF AI,ASKA ALASKA OIL & GAS CONSERVATION COMMISSION B.O-.P.E. Inspection Report Inspector Operator. .~_ ~¢_. ~ -- , k~Af~ ~ w ll / Location: Sec .~_ ~.. T ~Rf~ ~, Drilling Contractor ~~ Rig ~ . Representative Permit # ~ /~ Casing Set Representat iv~_ -- Location, General Well Sign General Housekeeping Reserve pit Rig BOPE Stack · 'Annular Preventer Pipe Rams Blind Rams Choke Line Valves //~-~ ~'~ t H. C~J~. Valve ill ~ine Valves o~f~' Check Valve Test Pres .sure 3o0o 3 0~,¢~ ACCUMULATOR S'YS TEH Full Charge Pressure ~ ~'OO ps.ig Pressure After Closure ~OO psig 200 psig Above Precharge Attained: (~ rain ~ rain O~ sec Full. Ch~ge P~ssur~..~ttai~.ed: Cqntrols: Master OK ~z~o ~-,.~,-~ ~:,~,, .'-~:.~ '?~' Remote ~l Blinds switch cove_r Kelly and Floor Safety Valves Upper Kelly. 0~( Test Pressure Lower Kelly O~ Test Pressure Ball Type Olt Test Pressure Inside BOP o~f. Test Pressure Choke Manifold NO. Valves / ~ ,.~0 o~ -- Test Pressure No. 'flanges ~ Adjustable Chokes tlydrauically operated choke -- O ---~est Time ~ .hrs Test Results: Failures - · F'~ I /"'~11 I I I Repair or Replacement of failed equipment to be made wi thin.~//~ days and"'~~l/ I~ Inspector/Commission office notified. Distribution orig.' - AO&GCC cc - Operator cc - Supervisor ARCO Alaska, In Post Office =ox 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 August 26, 1983 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' 1G-11 Dear Mr. Chatterton- Enclosed is a Sundry Notice for the subject well. We propose to complete this well with our workover rig. Since we expect to start this work on September 30, 1983, your earliest approval will be appreciated. If you have any questions, please call me at 263-4970. Sincerely, A~~ea,~ Engineer JBK/GRU4L38- tw Enclosures ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION Ct)MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER I~ 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 83-131 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21008 4. Location of Well Surface: 327' FSL, 806' FWL, Sec.29, T12N, RIOE, UM 5. Elevation in feet (indicate KB, DF, etc.) 99' RKB 12. I 6. Lease Designation and Serial No. ADL 25640 ALK 2571 9. Unit or Lease Name Kuparuk River Unit 10. Well Number 1G-11 11. Field and Pool Kuparuk River Field Kuparuk River 0il Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [XR Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other []X Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc., proposes to complete this well with the Westward Well Service Rig #1. The procedure will be as follows: 1) A mast truck will be utilized to run the CBL/VDL/GR and Gyro. 2) The rig will be moved on location; the BOPE will be nippled up and tested. 3) Selected intervals will be perforated within the Kuparuk formation and reported on subsequent reports. 4) The well will be completed with 3-1/2", 9.2 #/ft, J-55, BTC tubing. A 13-5/8", 5000 psi, SRRA BOP stack will be used on well work. The BOP equipment will be pressure tested weekly and operationally tested each trip. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A 5000 psi WP wireline lubricator will be used and tested on all wireline work. The subsurface safety valve will be installed and tested upon conclusion of the job. Estimated start: September 30, 1983 Subsequent Work Reportecl- 14. I hereby certify~qS'~t the foregoing is true and correct to the best of my knowledge. The space b/for~om~on use Conditions of A- ' ' pproval, i'f any: Approved by ORIGIN/Lt' SltillE:B BY LOflHIE C. SMITH /~pproved Returned By Order of COMMISSIONER the Commission Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate Form 10403 Rev. 7-1-80 GRU4/SN19 August 25, 1983 Mr. Jeffrey B. Kewin Senior Drilling Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510 Re: Kuparuk River Unit IG-11 ARCO Alaska, Inc. Permit No. 83-131 Sur. Loc. 327'FSL, 806'F~, Sec~ 29, T12N, R10E, UM. Btmhole Loc. 1792'F?;L, 4465'F~4L, Sec. 32, T12N, R10E, UM. Dear Mr. Kewtn: Enclosed is the approved application for permit to drill the above referenced well. If coring is conducted, a one cubic inch chip from each foot of recovered core is required. Samples of well cuttings and a mud log are not required. A continuous directional survey Ss required as per 20 ~C 25.050(b)(5). If available, a tape containing the digitized log information shall be submitted on all logs for copying except experimental logs, velocity surveys and dipmeter surveys. ~Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.05.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative'Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's Office, Department of Fish and G&~e. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the regulations promulgated thereunder (Title 18, Alaska. Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to co~aencing-operations you may be contacted by a representative of the Department of Environmental Conservation. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout Mr. Jeffrey B. K~win Kuparuk River Unit 1G-11 -2- August 25, 1983 prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. W~ere a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. Very truly, ~s, C. V, Chatterton Chair~n of Alaska Oil and Gas Conservation be,6zH/A Enclosure cc~ Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ARCO Alaska, Inc. /-"~ Post Office Bo~ 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 August 18, 1983 Mr. C. V. Chatterton Commi ssi oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: Kuparuk 1G-11 Dear Mr. Chatterton: Enclosed are: ° An application for Permit to Drill Kuparuk 1G-11, along with a $100 application fee. o A diagram showing the proposed horizontal and vertical projections of the wellbore. o A proximity plat. o A diagram and description of the Surface hole diverter system. o A diagram and description of the BOP equipment. Since we estimate spudding this well on September 1, 1983, your earliest approval will be appreciated. If you have any questions, please call me at 263-4970. Si ncerely, ~A~e~a Drilling Engineer JBK/JG4L23:tw Attachments Alaska OJi & Ga,~ fjords, (;omtni~iot~ Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA O,- AND GAS CONSERVATION CO~,,MISSION I ERMIT TO DRILL 2O AAC 25.005 la. Type of work. DRILL REDRILL DEEPEN 1 b. Type of well EXPLORATORY [] DEVELOPMENT OIL ~ DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC L~ SINGLE ZONE ~ MULTIPLE ZONE [] 2. Name of operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, Alaska 99510 4. Location of well at surface 327' FSL, 806' FWL, Sec.29, T12N, RIOE,UM ~ At top of proposed producing interval 1433' FNL, 3845' FWL, Sec. 32, T12N, RIOE, UM ~¢-jPr~ At total depth 1792' FNL, 4465' FWL, Sec. 32, T12N, RIOE, UM '~ 5. Elevation in feet (indicate KB, DF etc.) I 6. Lease designation and serial no. -'~^ RKB 99', PAD 63' I ADL 25640 ALK 2571 TM ~_ 12. Bond information (see 20 AAC 25.025) Federal Insurance Company Type Statewide Surety and/or number #8088-26-27 13. Distance and direction from nearest town 30 mi. NW of Deadhorse 16. Proposed depth (MD & TVD) 8677' MD, 7368' TVD 19. If deviated (see 20 AAC 25.050) KICK OFF POINT 800 feet. Weight 21 SIZE Hole Casing 24" I 16" t 3-1/2" 10-3/4" 8-1/2" 7" 65# 45.5# 14. Distance to nearest property or lease line miles 815' @ TD feet 17. Number of acres in lease feet 2459+ 20. Anticipated pressures MAXIMUM HOLE ANGLE 35 o (see 20AAC25.035(c) (2) Proposed Casing, Liner and Cementing Program 9. Unit or lease name Kuparuk River Unit 10. Well number 16-11 11. Field and pool Kuparuk River Field Kuparuk River 0il Pool Amount $500,000 15. Distance to nearest drilling or completed 1G-lOwell 60' ~ surface feet 18. Approximate spud date 09/01183 2695 psig@ 80°F Surface 3147 psig@.6754 ft. TD (TVD) 26# 22. Describe proposed program: in the diSPsiGNED ,~.~--¢,~f~r°ces~'~ /~. CASING AND LINER Grade Coupling Length H-40 Weld I I J-55 BTC I HF-ERW J-55 BTC / 8644' HF-ERW SETTING DEPTH M D TOP TV D 80' 36' I 36' 2305' 35' I 35' I I I 33' 33' I MD BOTTOM TVD 116' 116' 2340'12200' I 8677'17368' I I QUANTITY OF CEMENT (include stage data) + 250 cf 900 sx Arctic Set IV & 250 sx Arctic Set I 440 sx Class G extended 440 sx Class G neat Est. TOC = 2340' ARCO Alaska, Inc., proposes to drill a Kuparuk River Field development well to approximately 8677' MD (7368' TVD). Selected intervals will be logged. A 20", 2000 psi annular diverter will be installed on the 16" conductor while drilling the surface hole. A 13-5/8", 5000 psi, RSRRA BOPE stack will be installed on the 10-3/4" surface pipe. It will be tested upon installation and weekly thereafter. Test pressure will be 3000 psig (1800 psi for annular). Expected maximum surface pressure is 2695 psig. Pressure calculations are based on current reservoir pressure. Surface pressure calculated with unexpanded gas bubble at surface including temperature effects. The cement will be brought 500' above the top of the shallowest hydrocarbon zone or to the 10-3/4" shoe. Casing will be tested to 2000 psi prior to releasing the drilling rig. Non-freezing fluids will be left in uncemented annuli through the permafrost interval. Completion operations with the workover rig will be covered under a separate sundry notice. 1G-11 will be 60' away from 1G-lO at surface. There are no closer wellbores anywhere downhole. Reserve pit fluids will be disposed of by pumping them down the 7" x 10-3/4" ~nnulus of..this well. The 7" x 10-3/4" annulus will be left with a non-freezing fluid during any interruptions TITLE Area Drilling Engineer DATE / / Samples required []YES /~0 Permit number APPROVED BY Form 10-401 Rev. 7-1-80 //? GRU4/PD6 CONDITIONS OF APPROVAL Mud log required I Directional Survey required APl number []YES ~:JO I ~,Y~ES i--]NO 50- 0~- "L~O O ~ Approval date ' ~.,~/~3 ~ /] I SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE Au~l: 25, 1983 by order of the Commission Submit in triplicate PHASE II AS BUILT WELLS 9 lhru 16 29 i 31 ~ DS iA iT.I£N ~RIOE. PHASE I EXISTING WELLS I thru 8 32: NOTE:BASIS OF ELEV. IS TBM I--6 SOUTH PER LHD 6 ASSOC. NOTE: BASIS OF LOCATION IS MONUMENT' - IG MIDDLE AND IG SOUTH AS SET BY L.H.D. 8~ ASSOC. LOCATED IN PROTRACTED SECTION ?_9, TOWN 12 N., RANGE IOE., UMIAT MERIDIAN. I Th~s S-urve' 35 I CPFI DRILL~SITE I G CONDUCTOR BUILT LOCATIONS WELL 9 Y: 5,981,093.182 Lo/. 70°21'33.3989'' i '! X: 54.04558,976 Long. 149°40 14.036 I 444' FSL 780 FWL WELL I0 y: 5,981,034.77l Lot. 70°21'32.8237'' X 54Q,572.186 Long. 149°40' 13.66C~' 386' FSL 793' FWL wELL II Y= 5,980,976.130 Lot. 70°21'32-2462'' X: 540,5~5.500 Long. !49°40'13.279" 327' FSL 806 FWL T WELL 12 Y: 5,980,917.676 Lat. 70°21 '31.6706" X: 540,598.709 Long.,149°40' 12.902" 268' FSL 818 ._FW__L._. WELL 1:3 y: 5,980,838.480 Lat. 70°21'30.9103'' X= 540,247.544 Long. 149°4'0'23-185'' 191' FSL 466' FWL WELL [4 y= 5,~80,896.9~9 Lat 70°21'31;4858",, X= 540,234.224 Lo~'g. 149°4'0 23.56.3 250' FSL 454'FWL WELL 15 WELL 16 Y = 5,980,955. 661 Lat. 70021 '32.0642 ", X= 9,540,220.882 Long. 149040'2-.3.9:44 30 FSL 441' FWL y= 5,981,014.002.. Lat. 70°21'32.6388'' X: 540,207.932 Long. 149°40'24.313'' I 367'FSL 428 FWL ,, · I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA, AND THAT TH. IS PLAT REPRESENTS A SURVEY MADE UNDER MY DIRECT SUPERVISION AND THAT ALL DETAILS ARE CORRECT AS OF: ?. ~~_ CO Alaska, Inc. Kuparuk Project .~ :~i.,, -~_-~ DRILL SITE I ' G .~:;~-.. ~.---,~ CONDUCTOR AS BUILT p.~". ,,! . ~ ,.. .~:!: "'~'" LOCATIONS ~~] ,,,,. AUG,,,,98S ,c,,e. ,":soo' , IiIlIllII i.l tai-I drawn by' E.H, dw9. no. '9.05.107.11d 2_ 1 ,1D=81 ~ ~ I I i t I I ! i~i iii; .t [~'. -..-I ~ : [:l' 'l: --,' j ilL': [~l:bi.-r'~ i i !i~ I' .~I ! i } I ] I I I _; L~ i!~1 O. . Surface Diverter Ssstem 1. 16" Bradenhead. 2. 16"'x-20" 2000 psi double studded adapter. 3. 20" 2000 psi drilling spool w/lO" side outlets. 4. 10" ball valves, hyraulically actuated, w/lO" lines to reserve pit. Valves to open automati- cally upon closure of annular preventer. 5. 20" 2000 psi annular preventer. 6. 20" bell ,nipple. Maintenance & Operation l. Upon initial installation close annular preventer and verify that ball valves have opened properly. 2. Close annular preventer and blow air through diverter lines every 12 hours, 3~ Close annul ar preventer in the event that gas or fluid flow to surface is · detected. If necessary, manual ly over: ride and close ball valve to upwind diverter line. Do not. shut in well under an~ circu~nstances. 1 6" Conductor 13-5/8" 5000 PSI ~SRRA BOP STACK RNNUL.q'R PREVENTOR - ( BLIND P~qMs - . PIPE RRHS C ) . .c)_ - .() PiPE RRHS - , 'C ' 4 '_' 'TBGH3D '1 - I. 16" Bradenhead 2. 15" 2000 PSI x i0= 3%3 ?SI c:sing head 3. 10" 3000 ?SI tubing heed 4. 10" 3000 PSi x 13-5/5= 5500 FSi adapter spool ., 5. 13-5/8" 5000 PSI pipe rams " 6. 13-5/8" 5000 PSI drilling s-pool w/choke and kill lines .. 13-5/8" 5000 PSI pipe'ra~s- 13-5/8" 5000 PSL blind ra~s -- 13-5/8" 5000 PSI anF?qar ACCL~-IULATOR r..La$%ITT TEST _ - · ~ . - _._:-- ~._~. - . 1. ~4ECK x~,'D FILL ACCL~.n,.A-~OR -.~-$ERN'.'DI?, TO I ,-"~'El] NIT'r( HYDRAULIC Fl_DID. 2. ASSLFRE THAT ACCI~-Fu~_ATO~. P~L~.,E IS DDOD PSI WITH 1'500 PSI ~T7-,~'4 OF 'rr~ 3. OBSERYE TIHE ThT_N CLOSE ALL L~:iTS OUSLT 2uqD RECO?,D i-rlE T~'~.E ~ ? -RESS~,E I,"~ '~'I'ER ALL L~iITS ~ CLCS-~ W1T~ PU:4P OFF. 4. RECOg, D ON IADC ~EJ>O?,T. TH~ A?~_EFT.~-..,~L~ LiJ4IT IS 45 SE~-,.';~ L-LOSIN~ 'TLqE ARD 1220 PSI P~'%qINI~ P?-,~SSURE. - e 13-5/8' ~OP ST,r,~.( TEST I. ~!LL BOP STAC~ A~'~ MANIFOLD WITH X~-"-~Z-IC DIE.SEL. 2_. O~ECK TF. AT ALL HOLD L'"'-,,,C~ S~ ~-~_ FULLY ?.E- TP,.ACTED. PREDETE~-:I);E DEPT-_' TY~qT .'~ ~ILL SEAT A)~ SEAT I,'( ~-'~U-.~.D. ~'J.~"~ Il; LOCK D"r...4N SCP~,~S' IR HEAD. 3. CLOSE ~'C'{UL~3. PP,~'~; ~¢i"ER AND C:--::::)KES ~ 5"TPASS YALVES 0:( NA:IIFOLD. ~. TEST ALL COMPO;:E~FFS TO 250 .~I A,'O i-~O FOR 5. INC..-RE. ASE PRESSUP~ TO (D ~.CiLg FOP. MI?;UTES. BLEED TO ~,,0 ?SI. 10 ' ' PIPE ~J. ~ - ;:'-: - 7. I~;~E-PR~SU~ TO~~'{D H~ ~R lO ' - ' ' ' · . H!~. ' - ' : - .-5' 8. ~E V~V~ OI~f ~~ 0F ~. - ~ - TO ~o Ps~. - _ ~ . 9. ~gt TOP S~ OF PIPE ~ ~ ~ ~( J - ' S~ ~ P I PE ~J. 'r '- . - H!I~T~. B~ED TO Z~ PS~. · ~ - -,- B~ED TO ZERO PSI - j-- .-_-----: _- . · L .~?~ 0il_ & bas_. uufls, uo~_ n....,~,~mi~(:ir,- . L ,~LY~ ~ ~ 1,{ ~I~I~ .... '" '~, .... n- - '~I~l - ) --'------- --- .- -- -- _ . 14. l~ ~f : ~O I~I: ~ TO ~ ~I ~ -':": '' - .-: - ' -- UI7~ ~'~ ~.,~ ~ . ] __' : - : ~S. P~ TEST [nF~:TZ~ ~ ~ ~~ ~ -.-.- . : ' : T~T FOP;q SIG:; ~O S5'~ TO ~I~ ~J~- ] -::_--- :- .._~. v:~- : .... - .:- .' . . : · , ._ C mPa o ny .... . Fee .~ 1. (2) Loc f'~l~ thru 8) (3) Admin (~ thru 11) · Is the permit fee attached ' (4) Casg ~.~.~ ~'-~j-~ (12. thru 20) (5) (.21 thru 24) 2, Is well to be located in a defined pool 3, Is well located proper distance' from property line ................ 4. Is well located proper distance from other wells .................... 5, Is sufficient undedicated acreage available in this pool ............ 6. Is well to be deviated and is well bore plat inCluded ............. ~. 7, Is operator the only affected party ............ · ..................... 8, Can permit be approved before ten-day ·wait o 10. 11. 12. 13, 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24, 25. Does operator have a bond in force .................................. Is a conservation order needed ...................................... . Is administrative approval needed ........... , ....................... Is 'ductor string provided Is enough cement used to circulate on conductor' and surface ........ ', Will cement tie in surface and intermediate or production strings ,.. Will cement cover 'all known productive horizons~. '. .................. wii 1 rf g pr f h su ace casin otect res water zones ....................... Will all casing give adequate safety in collapse, tension and burst;. Is this well to be kicked off from an existing welibore ............. Is old wellbore abandonment procedure included 'on' 10-403 ............ Is adeq well bo sep io p p d · · uate re arat n ro os'e ,,,,..,,,,...,,..,,,,,.,,,, REMARKS Is a diverter system required ....................................... ~ Are necessary diagrams of diverter and BOP equipment attached ....... ~ Does BOPE have sufficient pressure rating - Test to ~O~d~ psig .. ~. Does the choke manifold comply w/API RP-53 (Feb,78). .................. Additional requirements ............................................. O. Additional Remarks: Geology: Engin~br~g: HWK ~.~ LC S ~_.~BE~7 _~/ · WVA ~ JKT~JH/ · rev: 12/06/82 INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA 'NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. , No special effort has been made to chronologically organize this category of information. ~', iiasl4a Oil a ~as Anchorage , V P 0 ! 0. F! 0 2 v +2 ~ I F iii C A T I n ~ .L I S ~ il'. t~! G P A G E 2 VP OlO,H02 ¥[<RIFIC.~..TIO:,! L, IS?!i'['C; PAGE SPE dP RFT1 RES RFT1 PRE RFT1 D 10 F? g T 1. D20 RPT1 ONE RFT 1. TEN RF'T 1 HUN RFT 1 THO RET 1 R RFTi ! 68 1o000000000000 68 10100000000000 68 10000000000000 6~ 10000000000000 1 68 10000000000000 1 68 10000000000000 1 6,8 10200oo0000000 1 68 10200000000000 I 68 10200000000000 1 68:10200000o0000o 1 68 10000000000000 TYPE; 1 4 5 7 9 1.1. SERVICE 1'. D ~EPT :TIM PFT I, 'ENS RFT1 [SPE PPTI, ;GP PPT1 'RES RVT1 ~P~g mFT1 'DIO RFT1 'D20 PFT !. 'ONE RFT 1. ~TEN RFT1 'HI!N RFT 1 'THO RRT1 :R PFTI SIZe; I. 2 1 1 4 4 1 0 -:'~ L 0 C K $ UNTT APl LOG TYPE PT O0 000 S 98 636 L ~.3 98 635 RPS 9a 970 PSIg 98 814 PSIG 9~ ~ 14 qB R14 98 ga 814 98 9~ 014 98 814 CAPJ' q8 3!0 REPR CODE 66 66 79 66 7.t 65 73 65 66 66 66 APl AP1 PILE 00 0 0 21 0 1 21 0 1 01 0 1 O0 0 1 O0 0 O0 0 1 00 0 00 0 1 O0 0 1 O0 0 1 00 0 1 00 0 1 O0 0 1. 0 0 .5.6 1 1 191 IN CH 6 1 N C H 1 SIZE 4. 4 4 4 4 4 4 4 4 4: 4 REPR PROCESS COOE (OCTAL) 68 00000000000000 68 10000000000000 68 ~0000000000000 68 10000000000000 6~ 10100000000000 6~ 10000000000000 6@ 10000000000000 60 10000000000000 68 10000000000000 68 10200000000000 68 10200000000000 6~ 10200000000000 6R 10200000000000 68 10000000000000 c, DATA ;GP ~O20 ~THr.] 7380,5000 5312.0000 0,0620 5,000o g T I P, vRp" 1.3020 -4800,0000 0,0000 93,6875 PTEN 4398,0n()O -40oo.o00o 3,0000 MSPE 28,2813 PDIO 0,0659 PHUN 3,0000 VIC 0'10.H02 VERIFICATION_ ~ IS' 'T'[NG., D~(.,E~ 4 45~ 2B6~ TE~S -3200,()000 5, o o 00 P ~ E 177.a75o * FILE TP~ILER ** ERVICE NAWE :LOG ERSION ~ I 2a.2 ATE :83/00/00 A×I~U~' I,,HNGTH ~1074 EXT FILF ~I~E : 'It, F, ~TE I~3/00/0o ~AX I ~[,tb~ [,ENGTH 'I [.,E TYPE 'REVlOt~$ 3~,4063 5,0659 .0000 DATA FORMAT RECORD ** ',NTRY P,I.,O C KS TYPE SIZE P ~:] PR CODE 'EN'T~ Y I, I 66 0 ~ 1 66 0 3 '2 79 56 t~ 1 66 255 5 1. 66 0 6 4 73 31 1 7 4 65 ~ 4 73 6 o 4 65 I ~ C H 11 ~ 66 16 I 66 0 0 66 )ATL!~ SPECIFICaTIOn' RLOCKS SERVICE SERVICE ~4!~ API BPI apl AP1 FIbE S~ZE SPL REP? )FPT FT On fi00 oo 0 0 4 PENS ~FT~ I,P, gq 635 21 0 2 4 4SPE ~W~l PP8 98 970 O1 0 ~ 4 5GP nF~'! PS J.(; o~ 814 O0 0 2 4 ~ES PFT1 PS!G o~ 214 00 0 2 4 ~P~E PF~I PSIG ~ ~14 O0 0 2 4, ~I)lO PFT! 9~ 914 oo 0 2 4 PROCESS CODE (OCTAL) 1 6a One00000000000 1 68 04000000000000 1 68 04000000000000 1 68 04000000000000 1 6~ 04100000000000 1 68 04000000000000 1 6H 04000000000000 1 68 04000000000000 VP OlO,H02 VEtqtFICr;TION I',T,qTIh~G PaGE 5 THO ~PT I, l~ F' T 1 GA. PI ~iTRY BLOCK5 1. ] 5 ? o 11 0 ~ATI,i~ SPECIFICATIO~ BLOCKS ID O~DER ~ CODE 66 79 66 66 73 65 73 65 66 66 I ~ P I ~ P .! ~"' I L F, E C~JASS MOD NO. 0 O0 0 6 21 0 2 5 21 () 2 0 01 0 2 4 00 0 2 4, O0 0 '2 4 O0 0 2 4 O0 0 2 4 00 0 2 4 O0 0 2 4 cO 0 2 4 00 0 4 O0 0 2.. 0 O0 0 SI ZE SPL 4 4 1 4 1 4 4 4 4 1 4 4 1 4 l 4 4 1 4 t 4 68 04000000000000 04,20000{)000000 8 04200000000000 68 04200000000000 68 04200000000000 68 04000000000000 REPR P~OCESS CODE (OCTAL) 68 00000000000000 68 04000000000000 68 04000000000000 68 04000000000000 68 04100000000000 6~ 04000000000000 68 04000000000000 68 04000000000000 68 04000000000000 68 04200000000000 68 04200000000000 6R (14200000000000 68 04200000000000 68 04000000000000 )EPT 65510.1016 ;GP 3370.0000 PRES )020 0.0615 PONE )THO 3.0000 GR )EPT 65597.0000 ETTM ;GP 3362.0000 PRES )020 0.061.5 PONE 5,3960 3382.0000 4,0000 6.1484 254 1351 3374:0000 6.0000 6g,5000 ~PRE PTEN TENS PTEr~ 4054.0000 ~SPR 1,8555 3382,0000 PDIO 0.0669 8,0000 Phi. IN 3,0000 4054,0000 ~SPE 1,3408 3374,0000 POlO 0.0669 7.0000 Patlt,~ 3,0000 VP OlO.H02 vF..~I. FtC,,ATImN T,'~r'Sm,T,:NG PAGF, 6 * FIL~C TR~%ILEP ** ,ERVIC~7 ~ A ~] :LOG 'MRSIO~:: ~' : 24,2 ,~TE ~83/00/00 ~AXI~]~ LF, MGTN :1o24 "[LE T'YPE :PP EOF 'TLM NA~E :RFT/ ,003 'ERETON .~ : 24.2 'I, LE TYPE 'REVIOUS FIL~ ]MTRY ~%LOCK$ TYPE:, SIZE ~ E.: P t7{ COt.) E EM'FRY I. 1 66 0 2 I. 66 O 3 2 79 56 4. I 66 255 5 1 66 0 6 4 73 311 7 z, 65 INCH ~ 4 73 6 9 4 65 INCH 11. 1 66 lg 16 ! 66 1, 0 o 66 ~NE:.'~ ,%FRVICF SERVICE U~.{IT ~.PI. .~PI API API FILE SIZE SPL REPR ID OR[)FR ~ [~0~ TYPF C[,ASS ~OD ~0, )EPT FT 00 000 00 0 0 4 ~TI~ ~F'TI ' S 98 '636 21 0 3 4 ~ENS ~FTI. i,B qB 635 21. 0 3 4 qSPEi PFTI ~PS 9~ 970 O1 0 3 4 ;GP RFT1 P$IG 9~ ~14 00 0 3 4 ~RES RFT1 PSTG ga 8!4 O0 0 3 4 ~PRF RFTi P$!G 99 814 O0 0 3 4 ~OlO PWT1 9q ~14 O0 0 3 4 ~O20 RFTI. 98 814 nO 0 3 4 ~ONE FFT1 9a ~14 0o 0 3 4 )TEN ~FTI. 98 il4 O0 0 3 4 ;THO qFT1 98 S14. O0 0 3 4 PROCESS CODE (OCTAL) 1 68 00000000000000 1. 6~ 04000000000000 1 68 04000000000000 I 68 04000000000000 t 68 04100000000000 1 68 04000000000000 l 68 04000000000000 1, 68 04000000000000 1 68 04000000000000 1. 68 04200000000000 1 68 04200000000000 I. 68 04200000000000 1 68 04200000000000 TYP 310 on 0 3 ¢,', 0 D E 66 66, 79 66 73 65 73 65 66 66 66 ~NTR 5 ~5 INCH AP,I AP1 AP1 Lf]G TYPE CLASS MOD ~O. CODE 00 000 O0 0 0 4 I 6~ q a ~ 36 21 0 .3 4 I 6 98 635 ~1 0 3 4 I 68 ga 970 01 0 3 4 1 6a q8 814 o0 o 3 4 1 68 98 al. 4 9a ~14 00 0 3 4 q~ al4, 9a al4 oo o 3 4 1 9a 814 00 0 3 4 qa 814 O0 0 3 ,4 1 68 q~ ~ 14 nO 0 3 4 1 O8 ~1.4 O0 0 3 4 1 6~ 9a 310 00 0 3 4 1. 68 04.000000000000 PROCESS ( OCT Al,, ) 00000000000000 04000000000000 04000000000000 04000000000000 04100000000000 04000000000000 04000000000000 04,000000000000 04000000000000 04200000000000 04200000000000 04200000000000 04200000000000 04000000000000 I~, DATA ** )EPT 655qo.oq3~ E'I'I';~ ~GP 3355.0000 PRES )[)20 0.0615 )THO 3.0000 GR ~* FII,F TPAILER ** "'ILK .~ ~ ~-~, E :RFT1 .003 IERSION # : 24.2 2.0620 33~2.0000 1.0000 226,5001. 3370.0000 2,0000 11B.6~75 PTEN RPRE 3900.0000 33fl2.0000 8.0000 38.~4,0000 3370.0O0O 7. OO0O MSPE PD10 PD] 0 1 4971 O!O669 3 0000 35 2813 0!0669 3 0000 ,ATE :[~,3/00/00 ~AXIYr..I~',~ I.,E~GT!..t : 1.02..,4 'ILE TYPE : PR ;ERV~CF NAME ;LOG ~A, TE :83100/00 tAXIMUM [~KN(,jT~ I 1.024 "[ I:,, F TYPE : 'REV~OUS FILE: ~ tNTRY E, LOCKS 1. 2 3 4: 7 9 )~TU~~ SPKC!FiCgTIO,N B[,[](.7. KS ~:x/E~'~ SF:RVIC~: S~RV]:(:~..'. II,',,!T API APl /\.PI API ~ILE SIZE SPt, REPR ID [']R[)F:R ~,* !,OG TYPF7 C1,/:,~55 M()D ) E P T F T 00 000 00 0 0 4 : T I ~" P ," T 1 $ 9 ~ 636 21 () 4 4 ?EN8 PET1 I,:15 98 635 21 0 4 4 ISPE PFT! R.PS q~ 970 01 0 4 4 ;GP PFT1 PSlq q8 ~14 O0 0 4 4 )~ES PF~'I PSIC o~ ~14 f)O O 4 4 ~PRE PFT1 PS'ICj 9g ~1-4 O0 0 4 4 }DlO PFT!. q~ ~!i, 4 OO {'.) 4 4. ~TMO reFT ! q8 8 1 4 0 0 0 4 4 PROCESS CODE (OCTAL) 68 00000000000000 1. 6fl 04000000000000 68 04000000000000 68 04000000000000 68 0~100000000000 1 68 04000000000000 1. 68 04000000000000 1 6~ 040000O0000000 1 fig 04000000000000 1 6~ 04,200000000000 1. 68 04200O00000000 1 6~ 04200000000O00 1 68 04200000000000 1 fi~ q4000000000000 ':NTF!¥ ,VP 010,H02 VERIFIC~TIf]I~ t,I',~IF,~ P~GE 9 TYFE 1 1 ? 4 11 1 0 R~PR CODE 66 79 66 66 73 65 73 65 66 66 66 SERVICE SFiRVlCF iD [~RDF. R ~ )EPT iT I ~ R F T !, ~EINS PFTI fSPE RFT 1 ;GP RFTI 'RES ~FT:I [PRE RFT1 ,D1 0 ~'~FT 1 'D20 ~FT 1, 'ONE RFT 1 'TEN RFT 1 )HUN RFT 1, 'THO RFT 1 ;R RFT1 APl AP:[ API FII, E TYPE CLASS Of';O Off o 0 6 36 21 0 4 635 21 0 4 97O 01 0 914 O0 0 4 814 O0 0 4 814 O0 0 4 8!4 O0 0 4 ~4 O0 0 ~14 O0 0 4 R ! 4 00 0 4 310 O0 0 4 T R Y o 0 56 ~55 0 311 ~',~ C f.~ 1 SIZF SPL 4 4 4 4 4 4 4 REPR PROCESS CODE (OCTAL) 6~ 00000000000000 68 04000000000000 68 04000000000000 6~ 04000000000000 68 0~100000000000 68 04000000000000 68 04000000000000 68 04000000000000 68 04000000000000 68 04200000000000 68 04200000000000 68 04200000000000 68 04200000000000 68 04000000000000 :* DAT~, ** 1.016 )EPT 65510.0000 ;GP 3375, '020 O. 061, 5 )THO 3.0000 PRF$ )EPT 65632,5938 ;GP 3362,0000 'D20 0.06~5 )TNO 3,0000 E T T 1,,: FILM TRAILEN ** rERS!O? ~ : 24.2 )ATE :83/00/00 ~AXT~U~': LENGTH :!(>24 ~Ib~ TYP~ :PI2 3.777O 3386.0000 9.0000 6.0430 354.5!30 3374,0000 6.0000 116.4375 T E N S ? T E N TE~S PPRF PTEM 3974,0000 3386.0000 8.0000 3934,0000 3374.0000 7.0000 ,~PE 1,8555 PDiO 0,0679 PHUN 3,0000 ~SPE 35,000O POlO 0 0669 PHUN 3:0000 YP OIO.H02 vERIFIC~.TIOt~i ~,..T..STING PAGE * FILE H~.',hDER ** IbE N'gHE ,,PFTI. E:RVlCK ~ A.~E :LOG ERSIGN ~ : 24,2 ~TE :83100/00 ~XI~U~ LENGT}.~ :~024~ REVIOUS F ~ I',., E : TYPE SIZE REP~ C01"~'i ENTRY 1 1 66 0 2 ~ 6 6 0 ] 2 79 ~6 5 I 66 0 ? 4 6 5 I ~.~ C H ~ 4 73 6 ~ 4 65 INCH 1[ I 66 1%~ 16 1. 66 1 o 0 66 SPECIFIC'.,~TI ~)N aL, OCK5 SERVICE: SERVIC~ []!',~.T.,T APl APl: ,API tlPI FILE SiZE SPb REPR ) E P T F T 00 000 00 0 0 4 :TIM PF"r 1 $ 98 636 ~';NS RMT1 LB g8 635 21 0 5 4 ~SPE ~FT1 RPS g9 gT0 O1 O 5 4 ~GP PFT1 PSIG 98 ~14 00 0 5 4 )PES r~ F'T 1 PS'.I G 9~ BI, 4 0(.) 0 5 ~PPE PFT1. PSIG 98 al4 oo 0 5 4 )OlO RPTI QB 81..a 00 0 5 4 ~D~O DF'T1 9R 814 O0 0 5 4 ~ONF: RFT1 ~ ~ ! 4 O0 0 5 4 ~TEN PFTI 98 ~14 O0 O 5 4 ~HI;N ~PT1 qi~ ~4 O0 0 5 4 ~THO ~FT1, 9B 814 O0 0 5 4 PROCESS COOE (OCTAl,) 1 68 00000000000000 i 68 04000000000000 1 68 04000000000000 1. 6~ 04000000000000 1 68 04100000000000 i 68 040000000(:)0000 1 6~ 04000000000000 1. 68 04000000000000 1. 68 04000000000000 1 68 04200000000000 1 68 04200000000000 1 6a 04200000000000 t 68 04200000000000 1 68 0400('1000000000 ,VP 010.HO2 VERIFICATIr'~ LISTT. r~!G PAGE 11 I~!E~ SF~RVI, CP~ SERVICF~ ID ORDER FT S PSIC P$IG AP1 APl AP]', API FILE f" ~ ~'l , , L,)G TYP CLASS ~'~O[) NO 0 0 0 00 0 0 0 0 98 ~ 36 21 0 5 9~ 635 2~ 0 5 98 970 Ol 0 5 98 81.4 O0 0 5 99 ~t4 O0 0 5 q~ ~ 14 O0 0 5 q~ ~1 4 O0 0 5 g8 ~14 00 0 5 9 a 81 4 0 o 0 5 98 8 14 o n 0 5 g fl ~ 14 o 0 o 5 9 $ 3 I, 0 o 0 0 5 SIZE SPL REPR COPE 4 I 68 4 1 6~ 4 1 6~ 4 I 68 4 1 68 4 1 68 4 I, 68 4 1 68 4 1, 68 4 1 68 4, I 68 4 1. 68 4 1 68 4 ,l 68 ( OCTAb ) 0000O000nO0000 04000000000000 04000000000000 04000000000000 041,00000000000 O4000000nO0000 04000000000000 04000000000000 0~000000000000 04200000000000 04200000000000 04200000000000 04200000000000 04000000000000 ~ * D A T A * * )EPT 65510.1()1 6 ;CP 3379. (')000 '020 0.0615 'THO 3,0000 PR PON g 65620.0939 3368.0000 0.0615 3,000O PRF$ FILE TRAILER ** ~ T., [,F N.A ~.! E :RWT1 .005 ,iERV ICE 'gA~g :bOG ~RSION ff : 24.2 )AT~i :P3/O0/OO ~AXI~UM I,~NGTH :102a ~'ILF TYF'K :PR 4~]XT FILE NA~E : 2.2390 T~]NS 3392 0000 ]: oooo 4.5469 320,2770 '¥E~& 3382.0000 RPRE 2,0000 PTEI~ 115.4375 4120,0000 3392,0000 9,0000 4!32.0o00 3382.0000 8.0000 MSPE PO~O PHUN P[)1 0 0,0669 3.0000 34 9062 0:0679 3.000O I~, FII, F HEADER , O06 VP 0].0,NO2 VERIF']'~CATTO~;,~ [,,ISTING PAGE 1.2 ERSI'ON # : 24.~ ATE : ~'~3/00/00 AXI~!U~ LM~GTH :1024 ILE TYPE : aEVIUUS FILE : b 7 9 1.,!. 0 SIZE R ~;P'R CODE ENTRY I 66 0 1 66 0 2 79 56 1. 66 255 1 66 0 4 73 ~ 6 5 I NC 4 73 6 4 55 I ~qCH I 66 0 66 ~ATU~a SPECIFICATION BI,[)CKS IMEM SERVICE SERVICE Ua~I'T aPI AP! APl aPI FIt, E SIZE SPb REPR ID ORDER ~ LOG TYPE C[.,ASS MOD ~EPT FT O0 000 O0 0 0 4 ','r I ~,~ ~ F T 1, S 9 a 6 36 21 0 6 4 'ENS ~FT1 T,B 98 635 21 0 6 4 ~SPE', ~FT1 RPS 98 970 01. 0 6 4 ;GP ~FT1 PSIG 98 8!4 O0 0 6 4 ~PRE ~FT~. PSIG 98 ~14 O0 0 6 4 '010 PFTI 9fl ~14 O0 0 6 4 'D~O ~FTI 98 814 O0 0 6 4 'ONE PFT1 q8 ~14 O0 0 6 ,TEN PFT1 92 81.4 O0 0 6 4 'HUN PFT1 9~ 814 O0 0 6 ,T~O ~FT1 9~ ~14 O0 O 6 4, PROCESS CODE (OCTAL) 1 68 00000000000000 1 68 04000000000000 1 68 04000000000000 1 68 04000000000000 1, 68 04100000000000 1 6~ 04000000000000 1 68 04000000000000 1 68 04000000000000 1 68 04000000000000 1 68 04200000000000 1 68 04200000000000 1 6R 04200000000000 1 68 04200000000000 1 68 04000000000000 DATA FOR),I~T RECORD ** TYPF SIZE REPR CODE ENTRY I ~ 66 0 2 1. 66 0 3 2 79 56 4 1 66 255 5 i 66 0 6 4 73 311 7 4 65 'I ~ C H !~ 4 73 6 ~ 4 65 W ~ C H [,, / ]..I !6 0 66 66 PROCESS ( OCTAL ) 68 O0000000oO0000 6.8 040t) O000000000 68 040oo000noO000 68 04000000000000 6~ 041o0000ono000 68 0400000000('t000 04000000000000 04000000000000 04000000000000 04200000000000 0420000000000~ 04200000000000 04000000000000 )EPT 65510.1016 ;GP 3368. 'D20 O. 061, 5 ' T 14 t'i 3,0000 2.0770 3382.0000 2.00O0 6.61,33 RPRE PTE~ )gP'r. 65574.9,031 ;(;P 3433. 0000 'D20 0,0620 E'r I x P U ~'.i E ]71.,6~.57 344-2.0000 7,0060 !~6,3750 T E ~ 8 PTEN' IERSIO}~ ~ : 24,2 )ATE :~3/00/00 ~AXI~':~a [.,E~GT~-] :~02~ ~ I [.;F TYP~ :PR ********** F':QV 3382 . 0000 P D 1, O 4044.0000 ~SPE 3442,0000 POlO 4,0000 PH[IN 1,9961 0.0669 3.0000 35.0938 0,0659 4.0O00 I ' G P A 6 E 14 ~RFVIOU$ g'i t,,E : DATA Ff,3R~"tAT ~ECnpr) *., ~NTRY 5LOCKS I ] 66 0 2 1 66 0 3 2 7q 56 4 I 66 255 5 1 66 0 b 4 7 3 3 1 1 7 4, 65 I ~ C H ~ a 73 6 9 4 65 1 N C N 11 1 66 18 16 I 66 1 0 0 66 )ATI..t~i 8PECIF'ICATIO~ BLOCKS ~NEI~ 8FTRVIi..'E SERvIc~ UM'I'f apl APl llPI APl FILE SIZE 8PL REPR ID ORDER # LI")G TYPE CLASS t~tOD NO, ) E.P T rz,r 0 o 0 o 0 00 o o 4 ~TIP, RF~I S 9fl 636 21 0 7 4 PENS P~'T 1, bP~ 98 635 21 0 7 4 ~SPE RFT1 RPS 9~ 970 01 0 7 4 ;GP RFT1 PSIG ga gJ, 4 00 0 7 4 ~RES RFT1 PSIG 9B 914 O0 0 7 4 {P~E ~FT1 PSIc~ q3 814 00 0 7 4 ~OlO RFTt 9g 814 O0 0 7 4 ~020 RFT 1 qg 814 O0 0 7 4 ~ONE RFT1 q8 814 O0 0 7 4 ~TE~ ~FT ]. 98 814 O0 0 7 4 ~HUN ~FTI 98 814 O0 0 7 4 ~THC) PFT 1 98 81. 4 O0 0 7 4 ;R RFTI ahP I'. 98 310 O0 0 7 4 PROCESS CODE (OCT!%L) I 68 00000000000000 1 6~ 04000000000000 1 68 04000000000000 ! 6~ 04000000000000 I 68 041,00000000000 1 68 04000000000000 1 6~ 04000000000000 1 6~ 04000000000000 1 68 04000000000000 1 66 04200000000000 1, 68 04200000000000 1 6~ 04200000000000 I 68 04200000000000 1 68 04000000000000 ~* D~TA Fr~R~,'AT RECC]R,r) ** RNTRY BLOCKS TYPE' SIZE REPR CODE 1 1 66 2 1 66 3 2 79 <4 ~. 66 5 ~ 66 ~ a 73 7 4 65 ~] 4 73 q 4 65 11, 1 66 1.6 1 66 () 9 66 EN TRY 0 0 56 255 0 311, I NC H 6 INCH .t ~ SPL REPR , hOG TYPE CLASS ir) 0 0 r~ 0 00 9~ 636 21 98 635 21 92 q7~ Ol o 8 a 14 0 O 9 ~ 814 00 q 8 ~ 14 0 (~ 9~ ~1 4 O0 9~ ltl4 O0 98 R 1. 4 00 qR R',14 nO q~ ~t4 o0 9~ 31o O0 )EPT 65582.8906 El'Iq ,3GP 33.36 0000 PRES ~ P 20 o: 061 5 P o ~,.~ ~;.; ;~ T H O 3.0 () 00 O R ~* FILE TRA.T. LER ** ]ERVICE NaME :~,O&' ' )ATE :~3/00/00 ~XIMI~ LENGTH : ~II, E TYPE ,0000 ,0000 ,21.09 212.4c ~ 3350.0000 RPRE 0 0000 FTEN :1 ,t. 6; 0625 NO,, 7 7 7 7 7 7 7 7 7 7 7 7 7 3 6.0000 5 , O0 O0 4000.0000 3350,0000 5.0000 CODE 68 68 62 68 68 68 6~ 68 68 ,,'),t S P E POlO PHt)N NaPE 1~'., !') 10 (OCTAL) 00000000000000 04000000000000 040000000000og o400000000000 04100000000000 04,000000000000 04000000000000 04000000000000 04000000O00000 04200000000000 04200000000000 04200000000000 04200000000000 04000000000000 3,41,60 0,0669 3,0000 35,0000 0,0679 3.0000 I~, FII.E SERVICE N IERSIOH ~ )ATE :a3/00/00 ~A~I~,'~ FILE TYPE ?REVIOIiS TY PF.i SIZFi REPR CO. DE ENTRY I 1 66 0 2 ~ 6g 0 ,~. 1 66 255 5 1 66 0 6 4 73 311 7 4 65 I t,,~CH ~ 4 73 6 9 4 ~ 5 1 ~ C H 1.5 ~ 66 I SPEC!FIC.~TIQN BLOCKS SERVICE SERVI('.F.,.: Ut,'rIT ~DI API ~PI AFI F'I'2LE SIZE 1,13 ORDER ~ [,OG TYPE CLhSS 'MOD NO. )EPT F'~/' OC~ oo0 O0 0 0 4 ~TI~ ~FT~ S 98 63~ 21 0 8 4 ~ENS PFT1 I,,~% 9R 635 21 0 8 4 ~SPE ~FT1 PPS 98 970 O1 0 8 4 ~GP ~FTI F',~ I C; ~ ~J 4 O() 0 S 4 >RES PFT1 PSIG 98 ~14 O0 0 8 4 IPRE [~FT1 PS'IG 98 ~14 O0 0 ~ 4 ~DI 0 RFT1 98 8~ 4 O0 0 8 4 >O20 RFT! q~ 814 oo 0 R 4 ~ONE ~?T1 9B 814 O0 0 8 4 ~T~N ~FTI g9 814 00 0 8 4 )HUN PFT]. 9~ 814 00 0 8 4 >THO ~'T1 9B 814 00 0 8 4. ;R ~FT1 GAPI 9B 310 O0 0 8 4 PROCESS CODE (O:CTA[,) 1 68 00o0oo00000000 1, 6~ 04000000000000 1. 6~ 04o00000000000 1. 6~ 04000000000000 6~ 04100000000000 1 68 04000000000000: I 68 04000000000000 1 68 04000000000000 68 04000000000000 1 68 04200000000000 1 69 04200000000000 1 68 04200000000000 1 68 04200000000000 1 68 04000000000000 ~* DATA F'OR~AT ~ECf]PD ** ENTRY BLOCKS 1 1 6b 0 2 1 66 0 3 P 79 56 4 ~ 66 255 5 1. 66 0 6 4 73 3!1 7 4 65 INCH ~ 4 73 6 9 4 65 INCH 11 I 66 16 I 66 ~ ~ 66 )ATU,u SP~?CIFIChTIO~ 4NE~ SFRVICE SERVICE U~'~IT APl hPI API APl ~I[,F SIZE SPb REPR PROCESS ID i3f4L)ER ~ !.O(; TYPE CLASS ~t3[.) Nr], C('30~ (OCTAL) )EPT FT 0O 000 O0 0 0 4 1 68 0000O000000000 ~'.r I, RFT1 S 98 636 21 C, 8 4 1 68 04000000000000 ~ENS RFT1 I~,~ 9~ 635 21. 0 8 4 1 68 04000000000000 ~SPE ~FT !, ~l?$ 9t~ 970 Of 0 8 4 1 68 04000000000000 , ,VP 010,NO~ VERI'FJ'C~TI'~O~;~ [,,TSTING P~GE 17 @ 1.4 8 !. 4 814 814 81,4 ~ 14 ~ 1 4 ~ 14 3 I, 0 0,2590 3416,0000 0,0000 ~,57~1 ?73,5966 3406,0000 0,0000 tl, 5,8t25 ~* FIL, E TRAIl, ER ** ;ERV!CE NAUE :LOG tERSlC!t,J ~ : 24,2 )ATE :~3f00/00 !~Xl~l..]~q LENGTH i1024 TENS RPRE PTEtb T E N S RPRE 4160.0000 3.416.0000 2.0O0O 4144.0000 3406,0000 g.o000 1 68 04100000000000 1 68 ~4000000000000 t 6~ ,4000000000000 1 68 04000000000000 1 6B 04000000000000 1, 68 04200000000000 1 68 04200000000000 1, 6~ 04200000000000 1 68 04200000000000 I 68 04000000000000 MSPE 2. 6035 PDI 0 0,0659 PHI.iN 4,0000 PDIO O, 79 PHUN ~, 0000 ~* [;'lL[!" HEADFR ** 'll, M ,~,'i A ~:' E : RF'T1 .009 ;EPVICE NAaE )ATE : ~3/r)0/0(~ ~AXI~IJ~' LENGT[~ :1024 ~ILE TYPE ~REVlO!IS FILE ~* D~TB FGRi~AT ~Ecowr> ** %wTRY BLOCKS TYPE 1 3 4 1 1 2 I RKPR 66 66 79 66 0 56 255 5 II P 010 ,, !..f 02 v !!.'. R I F I C A T I 0 I",~ !.., ]' S T I N G P a G E 18 5 1 6 4 7 4 9 4 11 S P E; C I F I C ,a. T 'I. {3 ~ B L 0 C ~ S I C E s E R V I C E U ~"~ I '~ 1, S 9~ 636 I. I, B 9 2 635 i R P S 9 a q 7 r'~ I PSIG q8 R 1. 4 1. PS!G 98 I PSlfl 91 814 1 98 !, ga ~14 1 9a 814 1 q~ 814 l, q~ 814 1 GAPZ 9a 3~.0 FORMAT R:ECO[~D ** 66 73 65 73 65 66 ,6.6 )lTl)lq SDE tNElh SF~V I r) APl LOG TYPE CLASS lqOD ~(~0 00 o 0 21 0 9 21 0 9 O1 0 9 O0 0 9 OC:~ 0 9 00 0 9 O0 O 9 O0 0 9 0 o 0 9 00 0 9 0 () () q 00 0 9 0 0 0 9 i 1 9., 4 1 5 1 7 4 () 0 CTF.TChTION BLOCKS ICV SERVICK [;qlT [tRUER ~ S I G I ¢; CODE 66 66 79 66 56 73 65 73 65 66 66 66 APl APl A. PI L~G TYPE CLASS O0 0o0 O0 o~ 636 21 off 635 21 98 970 O1 q~ 8~4 a~ g ~ 4 o q ~ 1 4 r) 0 98 ~14 APT Fib M C! P N 0 0 O 0 9 0 9 C, 9 0 9 0 9 (,) 9 0 9 S I SI o 31.1. d 6 18 1 ZE SPL REPR CODE 4 1 6g 4 1 68 4 1 68 4 I ~ 4 I 68 4. I 68 4 1 68 4 t 68 4 I 6~ ,4 I 6 iq 4 1. 68 4 1 68 4 1 68 ENTRY 0 0 56 255 0 311 q C H 6 1 PROCESS OCTAI..,) 00O0000 000000 04000000000000 04000O00000000 04000000000000 04100000000000 040000000¢)000O 04000000000000 04000000000000 04000000000000 04200000000000 0420000000¢~000 042000000000o0 04200000000000 04000000000000 (~CTAb) oo000oO0000000 04000000000000 0400O000000000 04000000O00000 041.00000000000 04000000000000 04000000000000 04000000000000 04000000000000 VP O10,H02 VER, tF'I'C?~TIr~!.:! LISTING PAGE ,!9 (; A P ! 9a a 1 4 oo 0 9 98 !~ 14 00 0 9 5} a 81.4 o 0 0 q g a R 14 00 c:, 9 qa 31,0 0t) 0 ~ I 68 0420000~000000 I 6~ 0420000 000000 I 68 04200000000000 1 b8 04200000t) 00000 1 6a 04000000000000 ,* DATA ,E'PT 65510. 1016 ,GP 3408 0000 'O20 0: 0615 ~ T H (] '3.0000 65626.8906 339 g. 000 il) 0,061 5 i,~, O 0 r) 0 :* FI'Ii, E TRAILER ;ERVICE NA~E 'ERSIO~.~ ~ : 24 ~ATE :~3100100 'ILE TYPE :PR ~'EXT F!L.~ E T I a PRES 5,6280 TENS 34120,0000 RPRE 2 , 0000 P T E 10.2 a 1, 3 ,, 009 EOF 4324, OOf) O 3420.0O00 2. 000o 4252.0000 534.12.000 ('~ 1' 0 000 ~ISPF, 3,11. o j, PD! 0 0. 0669 P a U t'..~ 4.0000 .~SPE 14.4766 P[}].O 0.0659 PHI.:IN 4,0000 'ERSION ~ : 24,2 ;ATF. ~3/00/00 iAXIYUU LENGT~ 'I bE TYPF: :NTRY F~ L,nCK S T R Y o 0 0 311 6 ~,VP O.iO,~O? VEF*,IFIC~a'[O~,:~ LI'ST!NG PAGE Il 1 66 16 1 66 0 0 66 C!FiCATIf'3N ICg SERVICE rjp D F.2 ~ # AP I LOG o 0 98 9,~ 9R 98 API API AP:3{: FILE 'TYPE ("LA,SS NOD tqO. 000 00 0 0 636 21 0 10 635 ~ 1. () t 0 970 ol o I0 914 0 n O 10 ai, 4 O0 0 10 814 O0 0 10 81.4 On 0 10 ~14 O0 0 1o R~4 OO 0 10 814 O0 0 10 814 O0 o 10 014 n{) 0 lO 310 00 0 I 0 SIZE SPL 4 4, 4 1 4 1 4 1 4 4 REPR PROCFSS CODE (OCTAL) 68 00000000000000 68 04000000000000 68 0~000000000000 68 04000000000000 68 04100000000000 68 04000000000000 68 04000000000000 6t:t 04.000000000000 68 04000000000000 68 04200000000000 rio 04200000000000 6~ 04200000000000 68 04200000¢100000 68 04000000000000 CNTRY P. LOCKS )ATUN REcr+p D ** TYPi;: SIZE REPR CODE 1 1 66 2 1 66 3 2 79 4 1. 66 5 ,1. 66 6 a 73 7 4 65 g d, 73 9 a 65 11 1 66 1.6 J. 66 O 0 6 6 SPF:CIF'TCaTIO~.~ F~[,OCKS SERVICF $~RVICE )EPT ,7. T.! N PFT1 fENS PFT1 ~SPE RFT1 ,~'S RFT1 ~PRE RFT1 >DIO PVT1 ~O20 ~FT1 >O~E pWT 1. >TEN RFT] >THO P~'T 1 U N T T L 13 PP,S PS I F; PSTC PSla (; a p :1'. APT aPI APl AP1 F I [,F.. LOG 3'YPE C[,~$5 O0 OOn O0 0 0 ga 636 7.1 0 10 ga 635 21 0 10 q~ 970 O1 O 10 9~ 814 O0 0 10 08 al4 no 0 10 q~ ~14 O0 0 10 9~ ~14 O0 0 10 qq ~J. 4 n0 (:} 10 9 R 8 14 00 0 10 98 ~ 14 O0 0 1. 0 9a S14 O0 0 1.0 98 3 ! 0 O0 0 10 {!]NTRY 0 0 56 255 0 NCH 6 NCq 1 $Ig~ SPL 4 1 4 1 4 1 4. 4 1 4 4 4 4 4 68 68 68 68 68 68 68 P¢OCE$$ (0CT~b) 00000000000000 04000000000000 04000000000000 04000000000000 04100000000000 04000000000000 04000000000000 04000000000000 68 04:000000000000 6a 04200000000000 68 04200000000000 68 04200000000000 68 04200000000000 68 04000000000000 ~VP 01.0,TM ' 2900 0000 4,0000 .7266 "I) Il.) 0 0 3416, ,,. 9,0000 1 i 6, ~*. FIbE TRAIT..,E~ ** ~' I l.., ..... Iq AI~M RFTI, ,01 a )ATE :83/00/00 ~ I I., E', TYPE] :P~ ~ILE N/~i4E :RFT1 ,01 1 ;ERV!CE NA~E :LOG rERSION ~ : 24,P )ATE :~3/0fl/O0 ~AXI~.~I.IM bENGTH :1024. 'ILE~ TYPE ~REVIOUS FILE : 4160.0000 3424,000n 2.00OO 4152, tq (') 0 ~) 3416. OhO 0 1. 0003 PDl. O P H U N IvlSPE PD1. 0 P 'H U ~ 3,5566 0,0679 4.0000 ]5,375(') 0,0659 4,0000 ~* DATI Vf3R~T RECO~D ** 1. 3 9 )ATI!I~ SOCCTFTC/~TII'~ F~bI:?CKS ~NE,~ SERVICE SERVICE UN'IT 1 2 1 1 't. 1 APl: REPR CAD[: 66 66 79 66 66 73 65 73 65 66 66 tXPI FIbE 0 0 56 255 0 3~1 H 6 I ~CH SIZE SPb RE;PR P~OCESS ,VP 010.t407 VKR.IF!CATiO~:¥ L 'I S 'T .[ N' (; PACE 22 iO C.tP, DER # t E: P T F T JT!M ~FT 1, ~SPK RFT1 PPS ;GP RFTI PSIG 'RES RFT 1 PSIC ~DiO RFT1 ~D~O RFT1 'ONE RFT t ~TEN RFT! 'TWO ~FT 1. ;R RFT1 GAPI LOG TYPE Ct,ASS 00 o o a 0 () 0 0 qa ~,36 21 0 11 c~ 635 21 O 11 q~ q70 Ol 0 1 9 ~i R I. 4 00 0 11 98 ~14 nO 0 11 ~ 814 oO 0 1I q8 814 O0 98 8 ~.4 00 o 11 Q8 *~ l, 4 OO o 11 o8 814: O~ 0 q R 310 00 0 11 CODE 68 6~ 6~ 68 68 68 68 68 6R (OCT,~L) 00000000000000 04000000000000 0400(')00o000000 04000000000000 04100000000000 04000000000000 04000000000000 04000000000000 04000000000000 04200000000000 04200000000000 04200000000000 Oa200000000000 04000000000000 DATA F[)R~aAT RECORD ** ~NTRY B[,OCgS Typ~" l 3 4 5 7 9 !1 1.6 SPECIFTC~TIO~ ICE SMRVICM ~RDER FT S PSI(; PS T (7.: PS 00 9~ 9a 9a q~ SIZ 66 79 66 '/3 ?3 65 66 .66 66 APl AP1 API FIt, E YPE CI,~SS ~r!D 000 O0 0 0 636 21 ('~ 1 ! 635 21. 0 11 9'/0 O1 o 11 814 O0 0 1!. ~14 O0 0 11 81 4 00 0 11. 814 O 0 0 1 't 81 4 00 0 11, 814 O0 0 11 ~14 O0 0 1 1 814 O0 0 11 3 1 0 00 0 ! 1 0 0 56 255 0 31. l INCH 6 1 SIZE 4 4 4 4 4 4.: 4 4 4 4 4 REPR PROCESS CODE 6R 00000000000000 6~ 04000000000000 68 04000000000000 68 04000000000000 ~ 04100000000000 68 04000000000000 6~ 04000000000000 6R 04000000000000 68 04000000000000 6~ 04200000000000 ~8 04200000000000 68 04200000000000 68 04200000000000 68 04000000000000 )EiPT 65510,10!6 , 3.1160 4144,0000 f' ESPE 3.6504 L'll~ 1'1 [Il iil iI:4 Id [:t: ~THO 3,0000 Ga 5 0000 , '.iL ~ 12,0S59 40,l ,.'2. 490 TENS 3402. 0000 RPRE 5 0000 115 6250 FILE TRAILER ** )ATK ~e3/O0/O0 ~,~XI~U~ LK~,~C;TH :1024 K T Y P [~7 : P R ~EXT FILE ~,~,~E : 34:12,0000 PD10 1,0000 P H U N 4192 ,,, 0000 M S P E 3402,0000 POl. O 0.0000 P H U a 0,0669 4,0000 o.3584 0,0669 4.0000 VILE ~ E R ,S :l: [:.} N ~ : 2,4.2 )ATP ~lXl~t~v, i.,ENtiTH :102,4 ~I, LE TYP~: *:*: D/~T:A ~'[:':tRkiATRECORD ENTRY BLOCKS TYP~ SIZE REPP CODE: ~:NTRY ! t 66 0 2 1, 66 O ] 2 79 58 ! ! 66 255 5 1 66 0 7 4 65 I ~C~ a 4 73 6 o 4 65 I :,ICH n 0 66 DATUm4 SPFCIFIC~TIOb~ BLOCKS I1) ORDFR -~ I,('3G TYPE Ct,ASS ~Ob ~'lO, CODK ~EPT FT 0 n 000 00 0 0 4 ~TI~ PFT1 8 9~ 636 21 0 12 4 tENS RF'T1 [.,~ 9~ 635 21 0 12 4 ~ SPF,', R~'P1 RPS q~ 970 01. 0 12 4 PPOCF$S (OCTAL) 1 6g OOC) O0000000000 1 68 04000000000000 1. 68 04000000000000 1 68 04000000000000 ,VP 010.H02 YERIFICATIOK~ I, ISTIr, C; P&G[~: 24 ~ D 10 R F T 1 ,O20 RFT1 ~T~O PFTI ;R R~'T 1 (;APl ~14 O0 0 12 814 00 0 12 814 00 0 1.2 814 00 0 12 R14 00 0 12 814 O0 D 12 814 o0 () 12 a 14 00 0 I ~ ~1 4 00 0 12 1 68 04100000000000 i 68 O4000000000000 1 68 04000000000000 1 68 O4O00000000000 i 68 04000000000000 1 68 04200000000000 1 68 04200000000000 68 04200000000000 68 04200000000000 1 68 (')4000000000000 * DAT/i F[]R,t,~,gT RECORD : k,~TR Y B I,,~3 CKS T }ATU[,! SP[~CIF'~.CATION gLOCKS TD ORDER }EPT :TIM RFTI. ~SP~ ~FT1 ~PS ;GP RFT1 PSIG 'RES FFT1 ~PRE RFT1. PSIG ~[)~ 0 'D20 PFT1 ~ONF ~T~N )HU~J ~PT1 iR RFT1 GAPI SIZE 1 2 t 1 4 4 4 4 1, 1 0 REPR CODE 66 66 79 66 73 65 73 65 66 66 66 ENTRY 0 o 56 255 0 311 6 1 API API APl APl FILE SIZE l,r]G TYPE CLASS MOD r) 0 000 00 0 0 4 98 636 ~1 0 12 4 q~ ~35 21 0 12 4 ga 970 O1 0 12 4 q~l ~14 O0 0 1~ 4 98 a 14 00 0 12 4 q~ ~14 O0 0 9~ 814 00 0 9~ R ! 4 00 C) 98 814 00 0 9~ ~14 00 {~ 98 ~14 00 0 12 4 9a ~14 00 0 1.2 4 9a 310 00 0 12 4 REPR CODE 68 68 68 68 68 68 68 6',9 PROCESS (0 A ) O00000000~T L 0000 04000000000000 04000000000000 04000000000000 04100000000000 04000000000000 04000000000000' 04000000000000 04000000000000 04200000000000 04200000000000 04200000000000 04200000000000 68 04000000000000 )EPT 85510,1016 ;GP 3395,0000 PRES ~[)20 0.06ltl )THO 3,0000 GR )F. PT 65624,7969 4.1530 3410.0000 q. O000 12.7578 335.0896 RPRE P T E 4120,o000 3410.0000 0.0000 4184.0000 ~SPE 3,8672 PD]O 0.0669 PHIIN 4.0000 USPE 35,1562 'THO 3. 000o (~R 3402.0O00 PDI 0 0,0669 4,0000 ~TRY BL, OCKS TYPE SIZE R .... [ ~, C,..)DE E~NTRY I, 1 66 0 2 1 66 0 3 2 79 56 l I 66 255 5 1 66 0 a 4 73 311 7 4 65 INC~ 8 4 73 6 9 4 65 I r.tC H 1.! ! 66 16 1 66 1 0 O 66 ]:D ORDF'R ~ l_,O(; "fY?El CLII. SS NtO!') NO. ) [: P T F T 0 n 000 00 0 0 4 ~'~'1 ~ ~'T1 S 98 636 21 0 13 4 ~ENS ~FT1 [.,B ga 635 21 0 13 4 ~SDF~ PFT1 PPS 98 q70 O1 C, 1,3 4 ~GP PFT1 PSIG 9~ 814 O0 0 13 4 )~ES WF'T1 PS'I(; 9[~ R!~ O0 0 13 4 =t~l 0 pFT1 ~a a 14 O0 0 13 4 ~D20 PPT1 ga al. 4 O0 0 13 4 PROCESS CODE ( 0 C q_: A 1.: ) I 68 00000000000000 1 68 04000000000000 1 6a 04000000000000 ! 6~ 04000000000000 1 68 04100000000000 ! 68 04000000000000 1 68 04000000000000 1 68 04000000000000 1 68 04000000000000 VP OlO.H02 ¥,ERIFI(.',ATI~'¥" LISTING PA(;E~ 26 PFT1 THO I 68 04200000000000 1 6~ 04200000000000 1 68 04200000000000 1 68 04200000000000 1 68 04000000000000 ',t~ T R Y BI',QCK8 2 4, 5 6 '7 0 !ATU~ SPECIFICATION BL[ICMS tNEP~ SFRVICE SERVICE U!,IIT S I Z 1 1 1 1 4 1 0 REPR COD~] 66 79 66 66 73 65 73 65 6~ 66 66 LOG TYPE CLASS O0 000 On o 0 o~ 636 21 O 13 ~ 635 21 0 13 98 970 01 0 13 98 814 O0 0 13 q~ al4 O0 0 98 81.4 O0 0 13 9a 81,4 O0 0 13 98 ~1.4 O0 0 !.3 9a ~14 O0 0 13 9e ~4 00 0 13 9a ~1.4 O0 0 13 98 814 O0 0 13 9~ 310 O0 0 13 8I 0 0 56 255 0 INCH 1 ZE; SPL REPR CODE 4 :1 68 4 1 68 4 1 68 4 t 68 4 I 68 4 1. 68 4 1 68 4 1, 6~ 4 I 68 4 1 68 4 1 68 4 1 68 4 1. 68 4 I 68 PROCESS (OCTAL) 00000000000000 04000000000000 04000000000000 04000000000000 04100000000000 04000000000000 04000000000000 04000000000000 04000000000000 04200000000000 04200000000000 04200000000000 04200000000000 04000000000000 )Ep'r 6551o.1016 ETII~ ;GP 3542,0000 ~D20 0.0605 ~'tHO 3.0000 )EPT 65716 7031 ;GP 3516:0000 PR~S ~D20 0.0615 ~T.HO 3.0000 1,9340 3554,000o 6.0000 !0,5938 609.7623 3530.0000 0,0000 0.7749 TENS PTEN 4164.0000 3554,0n00 5.0O00 2300.0000 3530.0000 3.00o0 MSPE PO10 PHUN MSPE POlO 3,1973 0,0659 5,0000 3,0098 0.0669 5.0OOO ~VP 010.H02 VERIFIC/~',F. IO!',~ LISTI'.~,,!G 'PAG~' ~,7 ,'* FT,[,F TR~,I'Li;TR ~TE :83/00/00 'II,E TYPE :PR 'ILE NA.~E :RFTI ,0l~ 'ERSION ~ : ~,4.2 )ATE :83100/00 ~AXI~U~~ LENGTH :10~4 'ILE TYPE : :* DATA ~NTRY BLOCKS TYPE SIZE REPR CODE EM'PRY 2 1. 66 0 3 2 79 56 ~ 1 66 255 5 1 66 0 6 4 73 311 7 4 65 I~CH a 4 73 6 9 4 65 ll 1 66 .18 16 1 66 1 0 0 66 )/%TUN1 S.P'ECTFTC.~TIOM BLOCKS ~NF~ SW~RVICE SERVICE i.I~TV' API ~PT APT ~PI FILE SIZE SPL REPR ORDER LOG TYPE C[,ASS ~OP NO, PROCESS CODE [OCTAL) FT O0 000 0¢~ 0 0 4 S q~ 636 21 0 14 4 1,~ 9~ 635 21, 0 :14 4 RPS 98 970 O1 0 14 4 PSIG 9q ~14 00 0 14 4 PSI(; 9~ 814 00 0 14 4 PSIG 98 al4 00 0 14 4 9~ 814 O0 0 14 4 90 ~14 O0 O' 14 98 ~14 O0 0 14 4 9~ ~14 O0 0 14. 4 9~ ~1.4 O0 0 1,4 4 ga 814 of) 0 14 4 GAPI 98 310 O0 0 14 4 1 68 O0000000000000 I 68 04000000000000 1 68 0400O0000OO000 1 68 04000000000000 I 68 04100000000000 1 68 04000000000000 1 68 040000OO000000 1 68 04000000000000 1 68 04000000000000 1 68 042000000O0000 ! 6~ 04200000000000 1 68 04200000000000 1 68 04200000000000 I 68 04000000000000 VP 0j0.!',{02 vER'[FICA'P[[}N I~T,STING PAGE] * D~TA FOR~,~'nT RFCnRD ** TYPE SIZE ~ }?]PR CODE I I 66 3 2 79 4 1 66 5 1 66 6 4 7,3 7 4: 65 ~ 4 73 ~ 4 65 Jl 1 66 1 h ~ 66 O 0 66 ~ATU~ SPECIFIC,~TION BLOCKS ~EPT P 'RES RFTJ PSIG ~DIO ~FT1 'ONE ~.FT 1 'TE~,~ P PT 1 'HUN ~FT 1 'THO RFT ~ ~PI AD:[ APl API FILE: LOG TYPE CLASS MOD NC). 00 00 o 0 o 0 0 98 636 21 0 98 635 21 O 14 g~ 970 O1 0 q8 814 O0 0 14 g8 814 O0 0 14 9~ ~14 00 0 14 98 814 O0 C 14 98 ~ 14 00 0 14 98 814 O0 0 14 9$ S~4 O0 0 t4 g8 814 00 0 14 ~8 814 O0 0 14 98 310 O0 0 SI ENTRY ¢) 0 255 0 H 6 I,~,CH 18 ..1 ZK SDL REPR CODE 4 I 68 4 i 68 4 1 68 4 1 6~ 4 1 6(4 4 1 68 4 1 68 4 1 6~ 4 1 68 4 1 68 4 1. 68 4 i 68 4 1 68 PROCESS (OCTAL) O0000000aO0000 04000000000000 04000000000000 04000000000000 04100000000000 04000000000000 04000000000000 04000000000000 04000000000000 04200000000000 04200000000000 04200000000000 04200000000000 04000000000000 )[fPT 65510.1. i)16 E'!FI ~ ;(;P 352 l. 0000 PR F"S )D2O 0.0{:,!.5 >THO 3. fi000 GR )EPT 65572,0938 ETI~ ;(;P 3523,o000 PRES ~O~O 0 0615 ~THO 3~0000 FILE TRAILER ** F'ILF ~; A r4f' : RFTI. .~ERV ICE b!A~ E : IERSI[.)N ~ : 24,? )~TE :83/00/00 014 2.4690 TENS 3534.0000 PPRE 5.000o PTE~'~ 10,2266 165,7077 TENS 3534,0000 PPRP 7,0000 PTEN 114,6750 4252.0000 3534.0000 3.000n 4228.0000 3534,o000 3.0000 PDIO PHUN USPE PPlO PHUN 3,1035 0,0659 5,0000 34.4688 0,0669 5,0000 F ' . STI ,. P~GF, 2q , !I' P 010, t:,l Q 2 V t:,i:, P, I .. I, C A ~ [ O ~t !,~ T, h G _ "I ]r~ g: T Y P Et ~ P R ~F, RV lC~ N ~'~E :LOG [ERSID~ ~ ~ 24,2 83100100 !AX~L,iM' LENGTH ~1024 ~.R~:V lt}U S FIL~ : )ITIJM SPFCTFICATIDN ~NK~.~ S~.iRVICE SE~VICF, I~'~TT APl APl,, AP'[ AI::'I FI[.,E SIZ%I SPL RE:PR I'D r1RDKR # 50G TYPE CLASS ;~(')P NO. )EPT ~'T O0 000 PO 0 0 4 ~TI~ ~FTI F gB 636 21 O 15 4 RKNS PF'F! I.,F~ q~ 635 21. O 15 4 ~,~ PFi RFT1 Pr°S 9~ 970 O1 0 15 4 ~(;P PFTI PSIG g~ a14 O0 0 15 4 ~RES ~Fml PSIG 9~ ~!4. O0 0 15 4 ~D20 ~TI ga 8t4 O0 0 15 4 ?ONE ~FT1 98 814 O0 0 15 4 ~FN ~F~' 1 98 ala O0 0 15 4 ~HIJN PFT1 q~ 8t4 O0 0 15 4 :TH~ ~tFT1 qa a14 O0 0 15 4 SR RF?I. C~Pl 90 310 O0 0 !5 4 PROCK$$ CODE (OCTAL) 1 69 0000000000o000 1 68 04000000000000 l, 68 04()00000000000 1 68 04000000000000 62 04100000000000 1 68 04000000000000 1 6~ 04000000000000 1 68 04000nO0000000 1 6~ 04000000000000 1 6R 04200000000000 1 68 04200000000000 68 04200000000000 I. 68 04200000000000 1 68 04000000000000 E~.ITa¥ BL, OCKS T Y P SIZE RF, PR CODE E'NTRY ,i ip 010,~I02 VERIPICAT'ir~?,i LISTING PAGE] 30 EPT TIM RFT1 SPE R,,F'T 1 RES F'FT1 DIO 9FTI 0 N E; ~ [;'T 1 ~'FTI ~EPT 6551.0,!016 ;GP 3523,0000 'D20 0,061.5 'TH[) 3. 0000 '~EPT 65589,5938 ~GP 3509,0000 )D20 0,n6!.5 ) T H O 3.0000 SE~VIC~ .~' A ~,~E :LOG ~RSTO~ ~ : 24,2 ~ATE :~3100/00 MILE MEXT FTL~ uf(rTT API ~PI ~Pl API FILE [.~0(; TYPE CbASS MOD ~{0, F T 00 000 00 0 0 S q~ 636 L '~ 98 635 ~ 1 0 1. 5 F~P~ OR 970 O1 0 I 5 P S 'I G 9 R 81, 4 00 0 15 PSIG 9~ 814 O0 0 15 PSI6 oR 814 O0 0 15 q8 91. 4 DO 0 I 5 98 814 O0 0 15 98 814 9~ 81~ O0 0 15 98 814 O0 0 98 814 O0 0 15 (;AP1 08 310 O0 0 I 5 ETI~4 226,0721 TMN$ PR~S 3520,0000 RPRE Pf']NE 3,0000 PTE~ CfR ~ 1.6,1875 ,0 ! 5 EOF ********** SI ZE SPL ~EpR CODE 4 1 68 4 I 68 4 1. 68 4 1 68 4 1, 68 4 1 68 4 1 68 4 1 68 4 1 68 4 1. 6R 4392,0000 3536,0000 3.0000 POlO PHUN 4360,0000 3520.0000 2,0000 MSPE PDIO PHUN PROCESS (OCTAI.,,,~ 0000000000000 0400000o000000 04000000000000 04000000000000 04100000000000 04000000000000 04000000000000 OaO00000000oo0 04000000000000 04200000000000 04200000000000 04200000000000 04200000000000 04000000000000 3,4316 0,0669 5,0000 35,1562 0,0669 5,0000 VP OIO.HO? VERIFIC~TIOf,~ .L!IST]NG PAGE 31 I L F r,,l A i'~ g : R F T .1. ,016 ERVICF NAME ERSIO~ # : 24.2 ,ATE AXI~,~U~ LEMGTH :10P4 ~ILE TYPE 'REVIOUS FILE '* DATA F('.DR~,~AT RECORD ** :NTR¥ BLOCKS TYPE SIZE REPR CODE ENTRY ~ ~ 66 0 2 1 66 0 3 2 79 56 ~ ~ 66 ~55 5 I - 66 0 6 4 73 31~ 7 4 65 IaCH 9 4 65 I ~'~ C H 11, 1, ~ 1 66 1 0 o 66 SPECIFICATION HbOCKS INEN SFRVICE SERVICE IIL~IT AP: APi APl API FIbE SIZE 8Pb REPR ID ORDER ~ LOG TYPE CLASS MOD NO. )EPT MT O0 000 O0 0 0 4 CTIM RFT1 S 98 636 21 0 16 4 ~ENS DF'T1 LB ~ 635 21 0 1,6 4 ~SPE RFT~ RPS 9~ 970 O1 0 16 4 ;GO ~FT1 P$IG 9R 914 O0 0 16 4 )RES RFT1 PSIG 99 814 00 0 16 4 {PRE RFT1 PSIG q8 814 00 0 16 4 mDlO OFT1 q~ ~14 O0 0 16 4 ~D20 RFT1 9~ 814 O0 0 16 4 )ONE ~FT1 98 814 O0 0 16 4 :TEN DFT1 9R 814 00 0 16 4 ~HUN PFT1 9~ 814 00 0 16 4 ~'r~o ~FT1 9~ 814 00 0 16 4 iR ~FT1 GAPI q8 310 O0 0 16 4 PROCESS COPE (OCTAb) 1 68 0000000000O000 1 68 04000000000000 1 68 04000000000000 1 6~ 04000000000000 I 6~ 04100000000000 1 68 04000000000000 1 68 04000000000000 1 68 04000000000000 1 68 04000000000000 1 68 04200000000000 1 6~ 04200000000000 I 68 04200000000000 1 68 04200000000000 1 68 04000000000000 I,,, DATA F(3RD~AT RECORD ** ENTRY P, [,F)C KS TYPE:: SIZE R~CPR CODE 1 1 66 2 1 66 3 2 79 4 1, 66 5 1 66 E N T R Y 0 0 56 255 0 '} ,'~ [,,OG TYPE CHASM aOD NO. F T 0 0 0 0 0 0 0 0 0 S 9~ 636 21 0 1, 6 ~ P S 9 ~ 97 () 01 0 16 PSIG 9~ ~1,4 O0 0 !6 P $ I G 9 ~ 814 00 0 16 PSIc; 98 ~,4 O0 0 16 9 a 814 00 0 16 9~ 814 O0 0 16 98 814 9S 814 O0 0 16 9a 814 oo o 16 GAPi q8 310 O0 0 16 $ I Z E 4 4 4 4 4 4 4 4 4 4 4 RE'PR PROCESS CODE (OCTAL) 6~ 00000o()0000000 68 04000000000000 68 04000000000000 68 04000000000000 68 04,4,00000000000 68 04000000000000 6B 04000000000000 68 04000000000000 68 04000000000000 68 04200000000000 68 04200000000000 68 04200000000000 68 04200000000000 6~ 04000000000000 )EPT 6 5!5!. O, 1016 ;C,P 3516. 0000 )THO 3,0000 )EPT 65593. 3906 ;GP 3511,0000 )D20 0.0615 >THO 3.0000 ~:* FlUE )ATE: :~3100t00 ~aXl~.;~,' r.~ENGT}i :1024 ~'I I,F TYP[~ ~EXT VILE ~:A~V : g'r I ~ 243 9902 PRES 13522;00(t0 P PR~.7 Pf'~i E 5,0000 C., ~-~ 1. t. 8 ~ ! 25o .016 4280.0000 'MSPE 3,5410 3530.0000 PDIO 0,0659 3,0000 PHUN 5,0000 4284,0000 3522,0000 2,0000 ~SPE'; 34,9375 P D 10 0,0659 PHUM 5,0000 I-'l'~ ~ D Iiil ilq/d [:-till ,VP 010.~02 V.[!]RIFIC~'rIn~:~ LJSTI'I~,~G PAGF; 33 BLOCKS Ty'p ~2 SIZF] REPR CODE: ENTRY 1 1 66 0 2 1 66 0 ~ 2 79 56 4 ~ 66 255 5 1 66 0 6 4 73 7 4 65 I ~ 4 73 6 q 4 65 INCH 11 1, 66 18 16 1 66 1 o o 6 6 SPIC(,':'[ FI'CAT I ON BI,OCK$ SERVICE SERV,I'.C[{ Ui'~!IT APl API ~PI AP1 FILE SI'ZE SPh REPR PROCESS ORDER ~ t,D(; TYPE: CLASS NOD NO. CODE (OCTAL) ' F'I! O0 000 O0 0 0 4 1 68 000000()000000 0 S 9R 636 21 0 17 4 i 69 04000000000000 1.~ 98 635 21 O, 17 4 1 68 04000000000000 ~PS 98 970 O1 0 17 4 i 68 04000000000000 P$IG 98 81,4 O0 0 1,7 4 I 68 04100000000000 PSIG 98 814: O0 0 17 4 1 68 04000000000000 PS!f; 9~ 814 O0 0 17 4 1 68 04000000000000 08 814 O0 0 17 4 1 68 04000000000000 98 ~14 O0 0 17 4 1 68 04000000000000 9~ 814 O0 0 17 4. i 68 04200000000000 9~ ~14 O0 0 17 4 1 68 04200000000000 ga ~14 O0 0 17 4 1 68 04200000000000 98 81.4 O0 0 17 4 1 68 04200000000000 ~API 98 310 O0 0 17 4 1 6R 04000000000000 ~* DATb. FDPNAT R~iC[!90 ** ~NTRY FLOCKS TYPE SIZE ~bTPP CODE EiNTRY 1 1 66 0 2 ! 6~ o 3 2 79 56 4 1 66 255 5 1 66 0 6 4 73 3!1 't a 65 I a 4 73 6 9 4 65 I~}CH !1 1. 66 ~ i 6 1 66 0 O, 66 ~SPE 'RES ~FT ~P~E PFT1 'D1.0 RFTI '020 'TEN RFT P :..T. glPI a..PI FILE P E C L 00 00 0 0 636 21 0 17 635 21, C, 17 9 V 0 01 0 17 8 i 4 (,) 0 0 l 7 814 00 0 al. 4 O0 0 17 914 O0 0 17 214 00 0 1, 7 814: 00 0 17 ~ i 4 00 0 17 g 14 00 0 17 3 !. 0 n 0 0 17 EPT 65510,1,01.6 ;GP 3503,000(1 '[) 2,. 0 0,06 2 0 ,'.tH 0 3,0 (100 P 0 ~:; 1., ~850 TENS 351. 4., 000 C) P P R E 7,0000 P T ~ 1, 0,5 )EPT 65585, o0o0 ;(;P 3497,0000 ~ P..,. 2 o. 0, o if., 15 'T ~,~ () 3.0 il) 00 P R E S 21.8,224.0 TEMS 3510.0000 RPRE 1.0000 PTEN 116.6250 ~* FIL~ TRAILEP 'ILE ~'APE :RFT1 .01.7 ;ERVICK NAME rERSION ~ : 24.2 )ATE 123100/o0 ~'AXI~IJ~,~ LEN(;Tk~ :1024 'ILE ?'FpK ********** F}['tF ********** S I Z E S P [,, 4 4 4 1, 4. 1 4 4 I 4 4 4 1 4. 1 4 1 4 t 4 1. 4 4212.0 (.) 00 3514.0()00 1,. 0000 REPR PaOCESS CODE: ( OCTAl', ) 68 00000000000ooo 68 04000000000000 68 04000000000000 68 04000000000000 68 04100000000000 6a 04000000000000 6~ 04000000000000 6~,~ 04000000000000 68 04000000000000 6~ 04200000000000 6a 04200000000000 68 04200000000000 62 04200000000000 68 04000000000()00 t,l,.:~ P E 3 ,, 2285 PDIO O, 0654: PHUN 5,0000 3934,00 (.) q ~ S P E 0 ,, 21. ~ 3 351.0,0000 PDIO 0'0669 1,0000 P ~'t U '~'.~ 5,0000 ;FPV!C~' ~ t~ ~-~ ~Y rERSIO~.~ ~ : 24.2 TyPE ~REVTOUS FI[,U : ~* FIbE ~'!EADE;R ** ~' l I,,, E i'~ A ME :RE'T1 ,00t /EPS'iON' ~ : 24,2 ;'II,El TYPE' : DATA ~NTRY BLOCKS TYPE SIZE PEPI~ CODE Eh,, .Y 1 'l. 66 0 ?, !. 66 0 3 2 79 56 5 6 4 73 191 7 4 65 INCH, ~4 4 73 6 9 4 65 16 J.. 66 1 0 f) 66 )ATI_!,~ 8PECIFICATIrI~ Bt,OC~$ Z~,l~;~ SERVICE SERVICE UNIT API API AP1 APl FILE SIZF 8DL REPR PROCESS ID 9PDE:R ~: bOG TYPE CLASS USD NO. CODE (OCTAL) iF, PT F'T OO OOO OO 0 0 4 1 68 00000000000000 VP OlO,H02 VEP!"FICAT!:O:!:~t LISTING P~GE 36 TI~ PFT1 $ 92 GP PVT1 PSIG 92 RES ~t~'T 1 PSIG 92 PRE ~FTI PSIG 9S D 10 ~FT 1 9 ~ '920 ~FTI. 98 '0 N E R F T 1. 9 8 'TEN ~FT l. 98 '~ U N ~ F"T 1 q a ' T H 0 R P T 1 98 636 21 0 ..1. 635 21 0 i 970 0 :t 0 214 O0 0 S t, 4: 00 0 81.4. O0 0 1 a 1,4 O0 0 1 ~ ! 4 00 0 1:. ~ 1. 4 00 0 814 00 0 I, 814 O0 0 ~ 14 O0 0 310 O0 0 4 4. 4 ,4 4 4 4. 4 68 10000000000000 !0000000000000 68 10000000000000 68 10100000000000 681.0000000000000 10000000000000 6S 10000000000000 68 10000000000000 68 10200000000000 68 10200000000000 68 10200000000000 10200000000000 68 10000000000000 SIZE 1, 1 2 1 4 4 4 4 0 C 00 E 66 66 79 66 66 73 65 73 65 66 66 66 API APl ,APl AP1 FILE: LOG TYPF, CI.,,ASS ~f.!D 00 000 00 0 0 q~ 636 21 0 1. 08 635 21 0 9 ~ 970 01 0 1 9~ ~14 O0 0 1 9~ ~14. O0 C, 1 9B 814 O0 0 98 8 ! 4 O0 0 98 814 O0 0 1 9 ~ 2 ! 4 98 Sl. 4 O0 0 9 ~ ~ ~ 4 00 0 9R 214 O0 g a 31. 0 00 0 56 1 1 6 1 4 1 4 4 4 '4 i 4 4. 1. 4 4 4 !. REPR PROCESS COPE 68 00000000000000 6R 1.0000000000000 68 10000000000000 68 10000000000000 68 10100000000000 6R 10000000000000 6R 10000000000000 60 10000000000000 68 10000000000000 6R 10200000000000 68 10200000000000 6~ 102000o0000000 68 10200000000000 6R 10000000000000 DATA )KPT 7414.0000 KT T r..t ;GP 5997. 0000 PRFS )D20 O. 0679 PONE 3.5290 -6R20,0000 7.0000 T E N S 4280.000o -6~20,0000 J,O000 ~SPE 31,5156 PI)lO 0,()718 PHUN 0.0000 !~'IO 6 00oo G~ ,!04,4375 -3978,0000 0 ,, 0 () 00 2 3 ~. 8 7 5 0 EOF ********** ' I L E Vii A :,,~, E : ~ F'r 1 002 (~ ~ ,, ~ ,,, rERSION ~ : 24,2 )ATE :83/00/00 IAXIr~lJ~,l I.~E',NGT}~ :1024 'lI,,E TYPE )R'~iV'I OIlS FILM 41, 60,00()0 ~,'tSP E -3979,0000 PDI, O 56,0938 0,0718 3,0000 DATA FORNAT RB~CORD ** ;~TRY Bl..,r.) CK $ T YPf~ SIZF7 REPR CODE ~JMTRY 21 1 66 0 2 1 06 0 3 2 79 56 4 1 66 255 5 t 66 O 6 4 73 311 7 4 65 I ~x~CH 8 4 73 6 9 4 65 I~CH 11 1 66 16 I 66 0 0 66 )ATI!~ SPFCTFIC~T'IO~) ~"~F,N SERVICE S'F~,VICEi I~?,iT'!' ADI apl APl aPT FTL~ SIZC SPL REPR PROCESS ID f~RDER ~ LOG TYPE C!,ASS ~OP NO. CODE (OCTAl,.) ~PT ~'r oO 000 O0 o 0 4 1 68 00000000000000 ~rI~ RFT1 ~ 9~ 636 21 0 2 4 1 6~ 04000000000000 ~EMS PFTI 1,~ 08 635 21 0 2 4 1 68 04000000000000 ~SPF ~FT1 P~S 98 970 O1 0 ~ 4 1 6R 04000000O00000 ~GP RF'TI PSIG e9 ~14 O0 0 2 4 1 6~ 04100000000000 ~RES ~FT1 PSIG 9~ ~14 O0 0 2 4 1 68 04000000000000 ~,1.. 4 o0 0 2, 4 ,ql4r o0 o 2 4 81,4 O0 c) 2 4 814 O0 0 2 4 814 O0 0 2 4 ~ 14 aO 0 2 4 310 O0 o 2 4 68 04000000000000 1 68 04000000000000 68 04000000000000 I 68 0420O0OO000000 68 04200000000000 1 6~ 04200000000000 1 68 0~,200000000000 1 6~ 0400000000000O ',NTRY T Y P F '2, 4 5 fi 7 ll .1.6 () )~TIJ),~ SPECT, FICATIOt,~ Bb[')CK;$ ID ORDE[~ ~ SIZE I, 2 l '.1, 4 4 4 1. 0 API AP! ,a, PI bOG TYPE CLASS O0 000 O0 9a 636 9;:~ 635 21 98 970 O1 q8 ~:14 O0 9~ gl4 O0 9 ~ ~ 14 00 98 ~14 O0 q8 ~14 O0 9~ ~14 O0 98 ~14 O0 9~ 310 ~6 66 79 66 66 73 65 73 65 66 66 IPI MOD NO, 0 0 0 2 0 2 0 2 0 2 0 2 0 2 0 2 0 2 0 2 0 2 0 0 2 SI ENTRY 0 0 56 255 0 311 6 1 ZE SPI.., REPR CODE 4 1 68 4 ! 68 4 1 6 ~] 4 1 68 4 1 68 4 1 68 4 1 6,9 4 1. 68 4 1 68 4. 1 68 4 1 4 1 PROCESS 00000000000000 04000000000000 04000000000000 04000000000000 04100000000000 04000000000000 04000000000000 04000000000000 OaO00000000000 04200000000000 04200000000000 68 04200000000000 04200000000C) 00 04000000000000 )EPT 65510,10!~ ~T'I~! ;GP 3530.0000 PRES )DPO 0,0669 PC?N~ 'THO 3,0000 G~ )(<PT 65597. o000 ;GP 3530,0000 'P20 0,067'9 4,60h0 3562.0000 5,0000 4.1836 222,1443 3564,0000 5.0000 TENS RPRF' PTEI,! k P P, ~l P T. E N 4460,0()00 )4SPE 1.2627 3562.0o00 Pl)IO 0,0728 4,0000 PHI. IN 5,0000 4432,0000 3564.0000 4.0000 ~,~SP~: 12. 4297 PPlO 0.07~ 8 PHUN 5,0000 ,VP 010,H02 ¥,?,,: IF.t[[ATI ~',~ L.TS'I'![ G ~ '" 'THO 3,0000 GR 137.6250 FILM '.HEAD~t~ ** 'VICE N~E 'ERSION ~ : 24,2 E: :83t00f0o IAXI ~U~ bEN(iTN 'ILE TYPE 'REVIOUS FILE :lq'TRY SIZE REP~~ CODE 1 66 0 1 66 0 ~ 79 56 1 66 255 1 66 0 4 73 31 4 65 4 77] 6 4 65 I N C H 1 66 18 :t 66 0 66 )ATU~ SPKCIFICATION !~EM SFRVICE SERVIC~q t)~.:IT ~PI ~PI AP1 .API FII,E SIZE SPl, REPR ID OPDF~R # LOG )EPT ~T O0 000 O0 0 0 4 ]TIM RFT1 S 98 636 21 o 3 4 !ENS PFT1 LB 98 635 21 0 3 4 fSPE RFT1 RP$ 9~ 970 O1 0 3 4 ;GP RFTI PSIG 9R 814 00 0 ] 4 'RES RFT1 RSIG gfl 814 O0 0 ] 4 tPRE PFT1 PSTG 98 ~%4 00 0 3 4 ,D~O RFT1 98 ~14 O0 0 3 4 '020 RFT1 98 814, O0 0 3 4 'O~E PFT1 98 814 00 0 3 4 'TEN RFT1 9~ ~14 00 0 3 4 PROCESS CODE (OCTAL) 1 68 00000000000000 1 68 04000000000000 1 68 04000000000000 I 68 04000000000000 I 6~ 04100000000000 1 68 04000000000000 1 68 04000000000000 1 6~ 04000000000000 1 68 04000000000000 1 68 04200000000000 1 68 04200000000000 NITN PFTI q~ ~ 14 0 o o 3 [~14 00 0 3 31,n 00 O 3 DATA FC.IR~T RF, C[.1RD * :NTRY EI,,OC~ S TYP ~ATII)~ SPECTFTCATION IME~ S~,RVICE SERVICE ID C~R D !!7, R ~, ~EPT ~ENS RFT1 ~PRF: RFT 1 'D10 RPTI, ~[.)NE RFT1 ~T~N RFT], ~T Hr'} aFT 1 ;R ~ IT APl I,,,OG F T 00 $ 98 I..,B 98 ~PS PSI't; 98 P$IG 98 9.~ $IZ TYP 00 63 63 q7 81 81 8! 81 81 81 C O D E 66 66 79 66 66 73 65 73 65 66 6~ 66 1EPT 65510,1016 ;GP 352~.0000 ~020 0.0669 }THO 3.0000 )EPT 65621.~969 ;GP 3520.000o :[)20 0'n6'79 ~THO B,O000 P i'~, F_: $ G~ E CL~88 ~mD 0 0 () 0 0 6 71 0 3 5 21 0 3 0 01 o 3 4, O0 0 3 4- O0 0 3 4 O0 0 3 4 O0 0 3 4 O0 0 3 4 0O 0 3 4 00 0 3 ~1 O0 0 3 4 O0 0 3 0 C, 0 0 3 9.0510 3556.0000 3.0000 4,2891. TENS RPRE P T E M TE~'S ~* FIL, E T~AII,,I~TR .003 337 8881, 355010000 5.0¢)00 142.7500 4 4 4 I 8iN 1TRY O 0 56 255 0 31 l INCH 6 INCN 1 SiZM SPL 4 1 4 4 1 4 1 4 4 4 4 1 4 4 l 4 1 4 4 I 68 04200000000000 68 042000(30000000 68 04000000000000 REPR PROCESS CODE ([C~A{.,,) 68 00o00000000000 68 o400o00000oo00 68 04000000000000 68 04000000000000 68 04100000000000 68 04000000000000 68 04000000000000 6~ 04000000000000 68 04000000000000 6~ 04200000000000 68 04200000000000 68 04200000000000 68 04200000000000 6~ 04000000000000 4372.0000 ~SPg 1,2939 3556,0000 POlO 0.0728 4,0000 PHI]f{ 5,0000 4360.0O00 3550.0000 3.0o00 -~SPE 41,718~ POlO 0 0728 p q[.l lu 5: 0000 L"I~ ~ 1 ! I m i 1 iI:4 ii_,.' Ir4 '~ ***~****** EOF ********** * FILF ~tE~DER *,* ~ERViCE NA~E :bOG 'ERSIt3N ~ : 24.,~ ~TE :83/00/00 A X I ~ I,] ~ L E: NC T '~ I.,E TYPE 'REVIOUS FthE : ~aTUg SPECIF!CA'FIOs, aI.~CCKS tMESi SFP, vICE SERVICE I.]¢~IT AP1 APl A¢I AP1 FII,E SIZe: SPL REPR ID ORDER , LOG 'tYPE E P T F T 00 000 00 i) 0 4 TI~~ RFTI S 9~ 63~ ~1 0 4 4 ENS RFT1 I.,B 98 635 21. 0 4 4 SPE PFT1 FPS 9a 970 01. 0 4 4 GP PVT 1 PS:T a OS 81. 4 00 0 4 4. RES aFT1 [>gig 9n ~1.4 O0 O 4 4 PRE PFT1 PSTG 9~t 814 O0 0 4 4 010 RF'T1 Oa al4 O0 0 4 4 920 PFT1 9~ 814 O0 0 4 4 ONE RFT1 9~ 81.4 O0 0 4 TEN RFT1 98 81.4 O0 0 4 4 HUN PVT 1 9a 31 a O0 0 4 4 THO PFT1 9~ ~14 O0 0 4. 4 P P F T 1. (.l ,:~ P I 9 ~ 31. 0 O ~ 0 ~ 4 P~OCESS CODE (OCTAL) 1 68 00000000000000 68 04000000000000 1 6~ 0400O000000000 ! 68 040O000O0000O0 1 6~ 04100000000000 1. 68 0400000000000{) 1. 68 04000000000000 fa 04000000000000 1. 68 04000000O00000 1 68 04200000000000 1 68 04200000000000 I 68 04200000000000 1 68 04200000000000 1 68 04000000000000 VP 0In.NO2 VERI~'ICATIr~q I,!STING PAGE 42 DATA F'OR~,~,AT REC[]RD * ~,~ T P Y BLOCKS TYP SPECIFICATION B[..O ID ORDER # GAPI SIZE RMPR 1 4 4 4 4 1 0 CODE 66 66 79 66 66 '73 65 73 65 66 66 66 TRY 56 2~ 0 311 H 6 1. API API ~PI FILE SIZE SPL LOG TYPE CLASS MOD ti o 000 o 0 0 0 4 '1 9~ 6]6 21 0 4 4 1 9~ 635 21 0 4 4 1. q~ 9'10 01, 0 4 4 9a ~14 0~ 0 4 4 1 9a 814 O0 0 4 4 9~ 8!4 O0 0 4 4 1 98 814 00 0 4 4 1 98 8 1 4 O0 0 4 4 1 98 814 00 0 4 4 90 81.4 O0 0 4 4 1 9B 814 O0 0 4 4 I 9~ ~14 O0 0 4 4 1 98 310 O0 0 4 4 1 REPR CODE 6S 68 68 68 68 68 68 68 6~ PROCESS (OCTAL) 00000000000000 04000000000000 04000000000000 04000000000000 04100000000000 04000000000000 04000000000000 04000000000000 04000000000000 04200000000000 04200000000000 04200000000000 04200000000000 04000000000000 :* DATA ** )EPT 65510,1,01.6 lgP 3524.000~) ~D20 0 0679 ~THO 3:0000 )EPT 65566.7031 ;GP 3520.0000 ~O20 0.0679 ~TWO 3.0000 PRES P 0 ~: E PR~.$ 1,0,8790 TENS . 3556,0000 RPR~ 9 . 0000 PTEN 5,3711 154.1595 TENS 3552,0000 RPRE 5.0000 PTEN 143.6250 4384 0000 3556~0000 3.0O0O 4380.0000 3552 0000 3:0000 MSPE PDIO PH!J~4 ~.SPE P{)l 0 P H U N 1,6221 0 0728 5:0000 42.6563 0,0728 5,0000 '* FII,F TRAIl, ER ** "' I [,E ~'~ ~'~ .',~ .F' : I~FTI ,004 ~ERVICE ~,~A~'E :LOG tERSICN ~ : 24.2 )ATE :~3/00t00 ~AXI~U~ LENGT~ :] ~ILF TYPM :PR }. [. PAGE 43 ,tEXT FILF...~ ~A',qE : ~* FILE', ~qEADER ** "I. bE t',t .~ :,~I E : ~. F'm.1 .005 ~ERSIC~ ~ : 24,2 )ATE ~3100/0o ~AXI'~I.[~,~ L~:~,]GT~4 : 1()P4 ~I[,E TYPE )REVIOIIS FlbE ~* DAT~ ~q~aT RECORD ** '7, NTR Y FiLOCKS TYPE SI%E REPR CODE ENTRY 1 ~ 66 ~ I 66 0 3 2 79 56 4 1 66 255 5 1 66 6 ,l 73 31 I 7 4 65 I ~'J C t4 8 4 73 6 9 4 65 ! 11 i 66 18 16 1. 66 1 0 0 66 SPECIFICaTIOn; ~I.,OC~$ SERVICE SERVICE [~NIT AP1 apl aPI apl F.ILE SIZE SPL, REP~ Ir) ORDER # bOG TYPE Cl.,ASS MOD 19'0. )EPT FT O0 000 O0 0 0 4 ETIP ~FT1 S 98 636 P! 0 5 4 FENS g~FT1 [,k> 98 635 ~1 0 5 4 ~SPE P~T1 PPS 98 970 O1 0 5 4 ~GP P~T1 PSI(; 98 814 O0 0 5 4 >RES PFT1 [~SIG 98 814 00 0 5 4 ~PRE PFT! PSIG q8 8!4 O0 0 5 4 :D10 PFT1 98 814 00 0 5 4 ~O20 ~FT1 OR P14 O0 O 5 4 ~ONE F~FT1 q8 814 00 0 5 4 ~TEN ~FT1 98 ~14 00 0 5 4 ~HIIF PFT1 98 814 O0 0 5 4 ~THO PFTJ. 9R ala oo 0 5 4 ~R ~:KT1 GAPI qa 31.0 O0 0 5 4 PROCESS CODE ([]CTAL) 1. 68 00000000000000 1 68 04000000000000 1 6~ 04000000000000 1 68 04000000000000 I 68 04100000000000 1 68 04000000000000 1 68 04000000000000 1 68 04000000000000 1 6~ 04000000000000 1 68 04200000000000 ! 68 04200000000000 1 68 04200000000000 1 6R 04200000000000 1 68 04000000000000 Sk}TR Y RI.,f)CKS TYP~i 1 , SIZE REPP CODE l 66 1 66 .EMTRY 0 0 ,1 ).ATU ~ii SP'ECIFICA, TION ~NEM SF.,,PVICE SERVICE Urq'IT API ~PI APT. API F'I[,',F,] SIZE SPb REPR )EPT FT OD 000 O0 o 0 4 ZT%M RFT1 $ 98 636 ~ENM ~F'T 1 ~,~ q~ 635 21, 0 5 4 ~SPE ~FT1 ~PS 98 970 Ol 0 5 4 ~GP RFTt PSIG 9~ ~14 flO 0 5 4 ~RFS R["T 1 PSI~ 98 ~14 ()o 0 5 4 ~PRE P'~'T 1 PS'IG 98 ~,4 O0 0 5 4 ~D20 ~F'T1 98 814 OO 0 5 4 ~ONE ~FT1 98 814 0() o 5 4 ~TEN {~F'T 1 9~ 814 O0 0 5 4 ~HUN ~FT1 9~ ~1.4 o0 0 5 4 ~THO PFT1, 98 814 O0 0 5 4 ;~ RF'T1 (i~P ~ qa 310 00 0 5 PmOCESS CODF, C OCTA [., ) I 68 00000000000000 1, 68 04000000000000 1 68 04000000000000 I 68 04000000000000 I 6~ 041.00000000000 1 68 04000000000000 1 6fl 04000000000000 l 68 04000000n00000 1 68 04000000000000 1 68 042o0000000000 1, 68 04200000000000 1 68 04,200000000000 1 68 04200000000000 I 68 04000000000000 DATA ** )EPT :'D20 65510.1,016 3527.0000 0,0679 3.000o ) E P '17 ~D20 ~THO 65583. 7969 ET!~ 3526.0000 P R F....$ 0.0679 3,0000 2.5720 TENS 3556,0000 PPRE 2 0000 PTEN 6:507~ 208.1103 TENS 3556.0000 RPRE 1,0000 PTEN 142.6250 4320.0000 MSPE 3556,0000 PDI. O 4.0000 PHUN 4320,0000 ~SPE 3556.0000 PD10 4.0000 PHI. IN 1.9648 0,0728 5.0O00 41,5313 0,0728 5,0000 ~I[,E 5A~E :RFT1 .005 ~ERSIO~ ~ : 24.2 )ATE :93100/00 ~AXI~I)~ I, ENGTH :1024 ~EXT FILE NAH~ : VP OIO,HO~ VERIFIiCATIDi': LISTING PAGE 45 r,i A ~,~. E :RET1 ,006 ERSION ~ : 24,2 183100/00 U~.~ LENGT'H :1024 TYPE : 0 [.~ $ F" I L E : SPECIFICATION BLOCKS ID OPDER !~ LOG TYPE CLASS YOD 'EPT FT O0 000 O0 0 0 4 ITtM ~PT1 S 98 636 ~1 0 6 4 'ENS ~FT1 I~,~ 9~ 635 21 0 6 4 ~.SPE ~TI. ~PS 98 970 O1 0 6 4 ;GP PFT1 PSIG 9a 814 (')0 0 6 4 'RES ~FT1 PSIG 9a 814 0O 0 6 4 ~PRK ~FT1 PSIG 9a 214 00 0 6 4 'D10 PFTI 98 814 00 0 6 4 'D~0 ~FT1 98 814 00 0 6 4 ~ONE ~FT1 98 814 O0 0 6 4 'TEN PET1 98 ~14 O0 0 6 4 '~I.tN PFT1 98 ~ 14 O0 0 6 4 'THC3 RFT1 9~ ~1.4 O0 0 6 4 ;R PET1 ChOY 9a 310 00 0 6 4 PROCESS CODE (OCTAL) 68 00000000000000 68 04000000000000 68 04000000000000 68 04000000000000 68 041,00000000000 68 04000000000000 6~ 04000000000000 68 04000000000000 68 04000000000000 68 04200000000000 6~ 04:200000000000 6~ 04200000000000 6~ 04200000000000 68 04000000000000 :* DATA F(.]R,~!AT ~EC¢:3~0 ** Ty P ~,2 SIZE r~ ~;p p CODE ~i Nl~R Y 1, I 66 0 2 1 66 0 3 2 79 56 ,~, 1 56 255 5 1 66 0 ~ 4 73 311 7 4 65 INC,q 9 1,1 0 ~NEM SERVICE; SERVICE Uk~IT ID ORDEP # 73 65 66 66 66 APl API ~P:i API FI LOG TYPE CLASS MOD 00 000 00 0 0 92 636 21 0 6 9~ 635 2i 0 6 98 970 01 0 6 c)8 814 00 0 6 9 S 81,4 0 0 0 6 9~ 81,4 O0 0 6 98 ~ 14 00 0 6 9~ ~14 O0 0 6 9~ a 14 00 0 6 98 ~14 00 0 6 98 814 00 0 6 9a ~: 1, 4 O0 0 6 98 310 O0 0 6 RPRE P T E ~,": )EPT 65562.0000 ETIP, ;GP 3522,0000 PRF:$ ~D20 0.0679 PP, PE ~ T H [') ,~. 0 0 fl () G R 13 , 9430 3556,0000 9.O000 5.5273 PpR1Y ~* FILE TR,IlLER ~ERVICF NAME :bOG )ATE :P3/O0/O0 ~XI~UP' LENGTh4:1024 rILE TYPF~ ~EXT FI [,~ 156,0815 3554.0000 7.0000 !45,3750 :6 ! N C, !,,~ :1 8IZg SPb REPR 4 4 4 4 4 4 4 4 4 4 PROCESS CODE t 6~ 00000000()0o0.o 1 68 O4000O000O0OOO I 68 04000000000000 1, ~8 04000000000000 t 68 0410000000o000 68 04000000000000 1 68 040000000oonoo 1 68 04000000000000 1 68 04000000000000 1 68 04200000000000 1 68 04200000000000 1 68 04200000000000 1 68 04200000000000 1 68 04000000000000 41.92,0000 3556'0000 3,0000 ,c, PE ,6846 PD ] 0 P}~IJ N 5' 0728 ,0000 4,432.0000 3554.0000 3.0000 ~SPB 43,7500 PDln 0,0728 PHUN 5,0000 VP OIO,HO~ VF:PIFICaTIO.~',~' .L, IS~'T..No, PAGE 47 AXI NU~ LENGT?{ 'IbM TYPE : 'REVIOUS FILE DATA F'f]R~AT R,F, CDpr.~ ** :NTRY BLOCKS TYPE SIZE REPR Cf]nE ENTRY 1 I b 6 0 2 ~ 66 0 3 2 79 56 ~ I 66 255 5 1, 66 0 6 4 73 311 7 ~ 65 INCH ~ 4 73 6 g 4 65 I N C ~,~ 11 ~ 66 1 8 0 0 66 )ATI,I~ SPECIFICATION BLOCKS ~NEM SERVICE SERVICE',. U~,I'[T API APl API ~.PI wII,E; SIZE SPL REPR ID ORDER ~ LOG TYPE CLA~SS MOD NO, ) E P T F T 0 o 000 (% 0 0 0 4 ',iT I ~,' RFT1 S 98 636 21 0 7 4 TENS PFT1, l,, ~;; 99 635 21 0 7 4 ~SPE RF'T1 RPS q8 97() O1 0 7 4 ~GP RFTI PS!.G ga 814 O0 0 7 4 )RES RFTI PSiC ga 814 OO 0 7 4 ~PRE ~FT~ PSIG 98 814 0() 0 7 4 ~DI.O PFT1 9~ 814 O0 0 7 4 ;D20 RFT1 ~ 81~ O0 0 7 4 ~ONE RF"T 1 98 814 O0 0 7 ~TEN UFT1 g~ 814 00 0 7 4 :NI.!N PFT1 98 B14 O0 0 7 4 )T~O PFT1 9~ al4 O0 0 7 4 ;R ~FT1 fiAPI 98 310 O0 0 7 4 CODE (OCTAL) 6a 0000000000o000 68 04000000000000 68 04000000000000 68 04000000000000 6B 04100000000000 68 04000000000000 68 04000000000000 68 04000000000000 68 04000000000000 68 04200000000000 68 04200000000000 6~ 04200000000000 6~ 04200000000000 68 04000000000000 DATA FOR,~!~T RECC',PP ** rNTRY BbOCKS TYPE SIZE ~V. PR CODF: 1 1 66 0 2 1 66 0 3 2 79 56 ,4 1 66 255 5 1 ~6 0 6 4 73 31.1 7 ~ 65 I~CH 8 4 73 6 9 4 65 INCH 11 1 66 18 16 1 66 1 0 0 66 , )ATUiq SPECIF'ICATI[)N '~NE~f SERVTC!!7 SERVICE', tJt~i!',lT ~,PI API A. PI API' FI[,E SIZE SPL REPR CODE (O¢,T~L) 1 68 00000000000000 .! 6~ 04.000000000000 1 6~ 04000000000000 1. 69 C) 4(,)00000000000 1. 68 04100000000000 ! 68 04000000000000 1. 68 04000000000000 1 6~ 040000000000¢~0 1 6~ 04000000000000 :1. 68 04:200000000000 1. 6a 0,4200000000000 1 68 04200000000000 1. 68 04200000000000 1, 6~iI OZ[O00000000000 0,1016 [,!~ T I 'a 2,4550 T E N $ 4424, ,i0000 ~,~ $ P E 1 0000 P~F~; ,35 ~'' . " p , ........ :)4 0000 b.P~E~ 3554,0000 [')10 0,0679 PON~: 6,0000 PTEN 3,0000 P~UN' 3,0000 GR 6,7695 2,0430 0,071~ 5,0000 )[:PT 65651 7969 ETI:;,ii 425,.~906 !J'F;t,)S ,~ ~ · ,~ ~ , ~(.,P 3521,0000 PRF,o 3552,0()00 ~PRE ~D 2 ("~ 0 0679 P "]~Jk 6,0000 P~Ev }TH[] 3~0000 GR ~,38,6250 4412,0000 '~SPE 3552.0000 PDIO 3,0()00 PHI)N 41,B125 0,0718 5,0000 ~* FILF TRAILER *', ~ILE N ~)~R :RFT1 ,007 ,~ERV ICF iv A ~El :LOC tEnSION ~ : 24..2 )ATF :83/00/00 ~I[,F TYPE :PR ~I~XT ~'"II,~ N~F : ********** EGF IERSION ~ : ~4.2 ~ATE: :g3/O0100 ~AXI~{,.~a LENGTH :10~ ~!LE: TYPE : }P~V ]'f~US F I I.,E : ~VP ~!C,,HO2 VEPIFICATIf't~,~ T,.,.TSTI~.IG P~(;E 49 :~,~TRY piLOCKS TYPE 1 2 4, 5 7 9 11 0 DATA FDR~,AT RECORD ** %MTRY BbOCKS TYPE 1 3 5 6 7 9 11 ~6 )gTUM SPKCIF!CAT!()¢! ¢1,0C~S ID f3RDFR # ) E P T ~'T '~, E 1 1 1, 4 4 4 .1, o COOK 66 66 79 66 66 73 65 73 65 66 ~6 66 bP1' APl LOG TYPE CLASS oo 000 O0 q8 636 21 98 ~35 21 9~ 970 9~ 814 O0 98 81a O0 9~ 81~ O0 98 814 O0 98 Rla O0 9R 014 O0 9~ 3~ O0 ~OD 0 0 0 0 0 0 0 0 0 0 0 0 WII, F NO. 0 8 SIZF: 1 2 t 4 4 4 4, ! 1. C 0 D [,: 66 66 79 66 66 73 65 73 65 66 66 66 bpi gPI O0 oon O0 O~ 636 21 API F1LE 0 0 0 8 EMTRY 0 0 255 0 311 6 H 1. SIZE sm 4 4 4 4 4 4 4 REPR PRt]CESS CODE 68 (2) 000000 000000 68 04000000000000 6S 04000000000000 68 04000000000000 68 04100000000000 6~ 04000000000000 68 04(}0000000(i000 68 04000000000000 68 04000000000000 68 04200000000000 68 04~00000000000 68 04200000000000 68 04200000000000 6~ 04000000000000 E N T R Y 0 0 56 255 0 311 6 INCH 1 4 SP!,, REPN CODE 1 68 t 6~ PROCESS (OCTAI,) 00000000000000 04000000000000 ~1.4. 814 814 R1.4 21. 01, 00 o 0 O0 0 o O0 00 O0 00 (10 0 O 1, 4,3830 3380,000 n 1. O00O 13,3281 TENS ~.~ P R E PTEN )EPT 65603. 5938 '}GP 334,~, 0000 PRES ) D 20 0,0679 P ('} N E )T~O ~. 0000 272,.121.1 3374.0 000 7,0000 I ]R.~%750 T Et N $ RPRF,: P T E~! ~* FIL~; TRAILER ** ~ILE l'q A ~'~ E :RFT1 ,008 ~?,RVICE ~'! a~v~ g :LOG rE,SI[IN ~ : 24,2 )ATE ~AX!~UN LENGTH :10~4 ~I[..,E TYPE :PR ********** EOF ~* FILE HF~,GE~ ** PILE NA~aE :RFTI .009 iERVICE t.;AaE :!,0,, IERSILqN ~ : 24,2 )~TE :83/00/00 ~AXI~U~ LENGT}.~ :1024 ~ILE TYPF : ~REVIOIJS FILE : 1 68 04000000000000 ! 6~ 040UOO00000OO0 I 68 041.00000000000 1 6~ 04000000000000 I, 68 (i) 4000000000000 1 68 04000000000000 I, 68 04000000000000 1 6a 04200000000000 1 68 04200000000000 1 68 04200000000000 1 6~ 04200000000000 1. 68 040()0000000000 4192,00on t~e oPE 4,0078 6 . 0000 P H f.t N 3 000 ,41gS,0nOO 3374,0000 5. 000O NSPE 19 7813 Pl')l 0 0 ~ 0718 P~!,.~ 3, ~)00o gNTRY gLOCKS TYPF 1 ?. 1 l CODE' 66 66 Fi N '].' R Y 0 (') .3 2 79 56 ,I. ..1 56 255 5 1 66 0 6 4 73 311 7 4.. 65 I ~q C H 8 4 7 3 9 4 65 16 ~ 66 1 0 c) 66 )ATUM SP~;CIF'IC~TION BL, O(]F,$ ~NEM SERVI'CF SERVI'CF UHIT &PI API API API FII,E SIZE SPb RMPI~ lID OPDFR # Lr3G TYPF!': CLASS MOD NO. )EPT FT O0 000 O0 0 0 4 ~TIM ~FT1 S 9~ a36 ~1 o ~ 4 ~ENS ~FT 1 l,f~ 9%] 635 21 0 9 4 ~8PE RFT1 ~PS 98 970 01. 0 9 4 ~GP 9F'.F 1 PSlG 9~ ~14: O0 0 9 4 '~ES PF~t PSIC qa al4 O0 f) q 4 ~PRE; RFT ~ PSIG ge ¢ 14 00 0 9 4 ~DI 0 RFT 1 98 814, O0 o 9 4 ~020 RF)I 9~ 8].4 O0 0 9 4 )ONE ~FT! 98 ~ 14 oO o 9 4 )TEN RFT ~ 9¢ 8 i 4 O0 0 9 4 ~ ~t U ~.~ R F V 1 9 ~ 8 ! 4 00 0 q 4 ~TH(:) PFT1 99 814 O0 0 9 4 ;R ~FTI GAP1 99 310 O0 0 9 4 PR[}CESS Ct}DE (OCTAL } 1 6R 00000000000000 1 68 04000000000000 ,1 6B 04000000000000 I 6).~ 04000000000000 1 6R 04100000000000 1 68 0~000000000000 I 68 04000000000000 I 68 Oz~O00000000000 1 68 04000000000000 I 68 04200000000000 1. 68 04200000000000 1, 68 04.?..000000000(;)0 1. 68 04200000000000 1 68 0,~000000000000 DATA F[)R'M~T RECORD ~;NTRY TYPE SIZE RE:P~ COl)fi; ENTRY 1. 1, 66 0 2 1. 66 0 3 2 79 56 4 1 66 255 5 1 66 0 6 ,4 73 311 7 4 65 ~ 4 73 6 9 4 65 1.1 0 0 66 ~NE~ SE,P, VICE SF. RV!r'F {{~'i'Iq' API AP1 ~.PI hPI F,)LE SIZE SPL REPR II) ORI')F;~ ~ T,O(; TYPE CL~.,$S MOD NO, )EPT FT O0 000 O0 0 0 4 ~TI~ R~'T1 S 9[~ 636 ~l 0 9 4 ~EHS PFTI I.,;~ 9R 6~5 21 0 9 4 ~SPE RFT1 RPS ~8 970 Ol 0 9 4 5GP PFT]. PST(; qR R!4: 0() 0 o 4 >~ES PFT1 PSIG q8 814 O0 0 9 4 ~PPF PFTI . P~3 ].G qg g'J, 4 0() 0 9 4 PROCF$S CODE (OCTAL} 6a 00000000000000 1 6~ 04000000000000 1. 68 040000000000O0 1 68 04000000000000 1 6~ 04100000000000 t 68 04000000000000 t 68 04000000O00000 .~VP 0:J.¢I,,~{02 VERIFICATIO~:F t. TST!~[~¢ P~(;E 52 0 9 0 9 0 9 4 0 9 4 0 g 4 0 9 )EPT 65686.0938 ETI~. ,,,P 3526 0000 PRES ~020 0. 0669 PONE ~THO 3,0000 GR 509,1.136 TENS 3554,0000 PPRE 1.0000 PTEN 138,6250 ~* FIbE TRAILER rERSIO~.~ ~ : 24:.,2 )ATE 1~3/00/00 IAXI~I,IN I,,EN(;TH 11,024: ~ILE TYPE ~ .I. [, E t,: ,A !,"~ E : FF,'RSI[~4 ~ : 24,2 )ATE :~3/00/00 ~AXIWU~" [,~GT~ :~024 ~ILF TYPE ~REV]OUS wILE : 1 68 04000000000000 1 68 04000000000000 l, 68 04200000000:000 1 68 04200000000000 ! 68 04200000000000 1 68 042n000000OOO0 1 6~ 04000000000000 4408,0000 MSPE 3572,0000 PDIO 4 273~ 0~071~ 5,0000 3790. 0000 M:SPE :~ 554 ~ 00 o o P !,',')10 4,0000 P H t) N 3,4004 5.0000 SIZE 1. 1 2 1 4 /~'i' 66 66 66 66 73 65 ENTRY 0 56 2..55 0 311 9 )ATU~' SPF'C T F"r C J\ T.T r}r ~NE~4 SFRVTCE' S~PVIC.' PS PS Iq' $ l t C: 73 66 66 66 ~ P T, 0 0 0 0 0 0 0 0 © 0 0 0 S! Z ?: ! 4. 1 ~;~'0. 0 4 1 10 4, 1 10 4, !. 1,0 4 1 10 4 t0 4 1, 0 4 iO 4 10 4 10 4, 1 10 4 1, 10 4 ! 0 4 1 :!, 0 4, 1 C O !:,) E 6 ~ 79 66 66 73 66 66 APl APl AP! 7.'Y P F: C [., A .q SY E'i D L~ 0, 000 0 c,~ 0 0 63 (- 21 (') 1 635 2! O In 97 t) o 1. c) 10 ~ 1 4 OO 0 10 ~ ! 4 0 0 0 10 R14 09 0 lO ~ ! 4 0 q 0 10 814 0 n 0 10 al,.4 nO 0 255 0 31.!. I ~,! C H INCH 1 C 0 6 6 PR DE 8 68 68 68 68 68 0 0 00 (,) 000 0 00 000 04000000000000 04000000000000 04000000000000 041.0()000000000 0400000000()000 04000000000 () 00 04000000000000 04,000000000000 04200000000000 0420000000(}000 04200000000000 04200000000000 04. 000000000000 PROCESS ( OCTA I., ) OoO00000000000 040flOOr)O0000()O 04000000000000 04000000000000 04100000000000 04(,~000()00000 O0 04000000000000 04000000000000 040000000000(.'0 042000000000()0 0420000000¢)000 04200000000000 I'-']~ ~ miil iI;] 1! [;] I 00 00 )EPT 65510,t016 ~' "'. I., ~.' I, '~'! -31.7260 ' C P ......... ~ ..., .2,0000 },., 3511,000(3 PRES 3r4' 0000 ~D20 0. 0679 ~ T H 0 3,0000 C; R :1.. 4.4:688 TENS R PR 65576 8906 ~,,!I'4 ..... 3507 ~ 0000 'I'~ R P':S 3536.0000 3,0000 t';R :I04,7500 PPRE '~ILE N A ~!E : RF'TI IEPSiO~I ~ : 24,2 )aTE :~3/00/00 ~ILE TYPE :PR EOF ~ILE N A ~,q ~'. :RFTt ~ E R V ! C F~ t,~ A. ~ E : L /ERSION ~ : 24,2 )ATE :~3/00/00 ~IL[ TYPE : )~ ~]V I i']ltS FILE 10 In 4464,0000 13542,0000 2.0000 68 04200000000000 1 68 04.000(.)000f)OOnO ~SPE 4.3672 'PD.I. 0 0,07~ 8 P'H I I'~ 5.0000 4468.00()0 I48PE] 4.~,8437 3536.0000 PD].O 0,0718 2.000n P~Uhi 5.0000 DaTA FOR;,~ A T T Y P E: 1. 2 5 7 9 .1.6 0 !. ? 1 i. .1_ 66 66 79 66 66 73 65 73 65 66 66 66 'r R Y 0 0 56 255 0 3!! [~CH IV.P 010.!402 VERIFI'ChTIOi'~f 7:.IS%:~'NG ]PAGe: 55 I D 0 R il) E R t,', P ]: API ~g P T F"ii'.' 00 0 () 0 :'.r I 1~,,~ f<* F T 1 $ q 8 636 !SPE RFT1 ~;PS 9~ 970 ', P R E r~ F' T 1 P 81 C q ~ a 14. ' 010 R F'T :! 98 a 14 'ONE RFT 1 q~ f:' 14 ' T H 0 P F T ~, 98 !~ 1, 4 la RF'T l, ~AP]: 9!'~ 3 l 0 PROCESS C 0 D E ( OC T a 1,, ) ! 68 00000000000000 1 68 04000000000000 :1 68 04000000000000 1 .68 0400o000000000 1 68 04100000000000 1. 68 04,000000(~00000 .I. 68 04000000000000 1, 68 04000000000000 68 0400()000000000 I 6~ 04200000000000 1 68 ()4200000000000 1 68 04200000000000 1 68 04200000000000 l. 68 04000000000000 ) ~ TI.!f,{ SP~TC! FICAT! [).~ tNEb~ SERVICM SE:RVICF: It~,ii"r AP.I )EPT r:T O0 OhO ;TTt4 PFT1 S q~ 636 ?F:NS PFT]. f,~', q~ 635 !SPE PFTi RPS qe q70 ;GP PFTI PS!C; 9~ '~ES WFT1 PS!G 92 81.4 ~PRE: PFT1, PS!(: 9~ 814 ~Di.O PET1 92 8!4 'DP0 PF'~! q~ g 14 'H~IN RFT1 ~8 814 iR RFml gfiPI 98 3!.0 APl' tkPI ~PI FI[,F ,q!~'5;': 5Pb PF:pP I.,QG TYI.:,F.: CLASS Mr:l) ,\o. ' CODE 0 n 0 0 4 1 21 0 1.1 4 1. 21 0 11, 4 1. O1 0 11 4.. 1 CO 0 1..1 4 1, n,,') 0 t I 4 1 00 O :11 4 l o.O o i 1 4 no o 11 4 1 ~:.) 0 11 4 O0 0 1 i 4 r.'} O 0 11 4 0 n 0 I 1. 4. PROCE:SS ( 0 CT h I.: ) 60 00o()(500000o000 68 04000000000000 6q 04ooono0000000 6R 04000000000000 68 04100000000000 6~ 040000000ooono 68 04 000000000000 8fl 04000000000000 6~ 04000000000000 62 04200000000000 68 1 68 04200000000000 1. 62 04 2000f3900()000 1 68 ()40eno00000000 ., ¥ P 010 , *,~ 02, ¥ E P I F ir.. C. ,~ T I (3 !",i r.: I S q~ I. bl G P a ¢~F 56 )[/,P .. 65510,1016 ,Gl: 3.507 0000 'THO 3, oO0O 2,4990 3540,0000 RPRE '1 ~. 3906 ~I 1 ~. 9343 TENS 3532,0000 PPR~ 6,0000 ,'* FIL..E TP,,~.ILE~, ** ~ERSION ~ : 24,2 )ATE 'I[,E TYPF, ~PR ]EXT FI [ a,,, 44, ~, 0000 t~,S P F: 3 ii 4 fl ,,0 000 P I') i 0 O. 5. 0000 42.6250 0,071~ 5,000n FILE HE,,~DE:R ** ' I [.,E: N g b,lE :RFT1 ;EPV ICF, MA~E :LOG )ATE : 83/OO/00 RAXINUD' [.,EN'GTH ~ 1024 'ILE TYPE )REVIOUS FILE .',NTRY TYPE: SIZE FEPR CODE EM'FRY 1 1 66 0 2 1 66 0 3 2 79 56 4 1 66 255 5 1 66 0 6 4 73 7 4 65 I ~ C ~'1 ~ 4 73 ~- ,l 65 I ~l I 66 18 f,' 0 66 )AT{t~,1 SFECIFICATIO~I BLOCKS iNF.'v` $~'¢VICE S~[4vICF', [):,,TT APl API hPt [Fl FII, E: SIZE SPL, REPR PROCESS ID ORC)~P ~ [,[')G TYPE CLASS HOD Nf]. CODE (OCTAI~) )F, PT F"{ O0 OOf) 0O o 0 4 l 6B 00000000000000 C'I' I ~ PFT1 S 98 636 21 0 12 4 1 68 04000000000000 010,H02 VE~IFIC~'I'.t;~P~ I'..,'TSTTN'c .... P.~.GE 57 63 97 81, Ri O1 0 0 00 ('~ fl 00 00 O0 O0 12 12 12 ,1,2 12 12 12 1.2 1,2 12 .1,2 12 1 68 04O00000000000 I 6E~ 04.0o0000008000 68 041000,0000 0()0 1. 6R 0400000000OO00 1 6a 04000000000000 1 6B 0400000000O000 68 O4O00000000000 i 6R 04200000000000 1 68 04200000000000 1. 6~ 042000oonooo00 1 68 04200000000000 I 68 040000000000n0 ~:* DATA FORMAT, REC[iRD ** ENTRY' BLOCKS T YP 3 4 % ? 9 16 0 SPECIFICATION BLOCKS SEPVICE SFRVICE D}.~ I T DATA )EDT 65510,1016 ETI~ ~GP 3331.0000 PRES >D20 0,0679 PC)NF ~THO 3,0000 G¢ SIZE 2 1 1 4 4 4 1 0 R~PR CO r')E 66 66 79 66; 73 65 73 65 66 66 66 API A.. P l' APl API FILE LOG TYPE CLASS MOD 00 (:) (', 0 0 fl 0 0 98 636 ~1, 0 98 635 21 0 12 98 970 01 0 12 qR ~1.4 On 0 12 ~8 814 O0 0 12 q~ 81.4 O0 0 12 98 814 O0 0 12 9a 814 O0 0 98 gl4 O0 0 12 OR ~1..4 O0 0 12 9H 814 O0 0 12 9n 81~ O0 0 12 98 310 O0 0 12 T RPRE P T E ~'~ 3 , 3940 3364, 6,0000 1.4.7734 ENTRY 0 0 56 255 0 311 INCH Tk~Cg 1 SIZE SP[.,, REPR CODE 4 1. 68 4 1. 68 4, 1 68 4 1 68 4 I 68 4 1 6~ 4 1 68 4 1 6~ 4 1 68 4 1 68 4 1 68 4 1. 68 4 1 68 432~,0000 3364.000O PDIO PHtJN PROCESS (OCTAL) 00000000000000 04000000000000 04000000000000 04000000000000 04100000000000 04000000000000 04000000000000 04000000000000 04000000000000 04200000000000 04200O00000000 04200000000000 0420O000000000 04000000000000 4,4~09 0,0718 3,0000 I';~ ~ I m I mil iI:4 i[! [:t I 'D20 4120.0n00 IvlspE 3, 62'0000 PDtO 4 . 0000 P H U N 3: 0o0o ,ERV'ICE ~ ~E :LOG ,ATE :83100100 [A. XI~UM L~NGT~ ;1024 'I[,E TYP~ IEXT FILE rERSION ~ : 24.2 )ATE :83/00/00 ~AXI~U~I LENGTH :102~ ' II,,E TYPE : ~REVIOi]S FIbE ~NT~Y BLOCKS TYPE S :,[ Z [~ [~: F: P ~' CODE ~:N TRY 1 1. 66 0 2 l. 66 0 3 2 79 56 4 ] 66 255 5 I 66 0 A 4 13 311 7 4. 65 IaCH ~ 4 73 q 4 65 I 11 1 66 16 1. 56 1 0 0 fi 6 )ATIIh~ SPECIFIC~TIO~i {~LOCKF, tNE[i SW...~VICE SERVICE l]~!l'~., lPI APl hPI APl F![,E SIZE: SPL REPR )EPT FT O0 0()0 00 0 0 4 ~TTN PFT1 S 9~ 636 21 0 13 4 ?ENS ~FTI 1.,}'~ 98 635 21 0 13 4 4SPF: ~' F'I' i ~P5 9~ 970 01 0 13 4 ~GP RF'T1 PSI(; 97 ~14 00 0 13 4 ~RE;S PFT1 PSla 98 al4 O0 0 13 4 ~PRE RFTI. PSI'(; 98 834 0() 0 13 4 PROCESS COi)E (OCTAl,) 1, 68 00000000000000 1 68 04000000000000 1 68 04000000000000 1 68 04000000000000 6~ 04100000000000 I 68 04000000000000 1, 68 04000000000000 ,VP 010,H02 V~.IFICA~IOi~i! LISTING PAGE 59 ~ 0 0 I 3 O0 0 13 O0 0 1 3 0 0 0 1 3 Or 0 0 1 3 On 0 1 3 I 69 04000000000000 1. 68 04000000000000 1 68 04200000000000 1 68 04200000000000 1 6~ 04200000000000 1 68 0.4200000000000 I 68 04000000000000 INTRY BL.OCKS T y p F 2 5 7 9 1! !6 9 SPECIFICATION SIZE 1 2 1 I 4 4 4 ~ E P F! C O D E 66 66 79 66 66 73 65 73 65 66 66 SI T R Y 0 O 56 255 0 311 H H 1 PROCESS (OCTIL) 00000000000000 04000000000000 04000000000000 0400000000nO00 04100000000000 04000000000000 04000000000000 04000000000000 68 04000000000000 68 04200000O00000 68 04200000000000 68 04200000000000 68 04200000000000 6~ 04000000o00000 )EPT :T~O )EPT ~D20 .~THO ~5510,1016 3/!12, OC00 0.0679 3,0000 65595.7031 3406,0000 0 , 066, 9 3. 0000 . ~. PON.Fi C 9 ~'rl PRES P 0 ~; E 2,6170 3442.0000 7.0000 15.96a7 ?35.4554 34.36.0000 1,0 00 0 1. 42.3'150 TENS ~:; T E M TENS RPRE 4.312.0O0 3442. 2,000O 4288,0o00 3436,000O 2,0000 MSPE PDI0 PDlO P H [! N 4.8203 0,0728 4,0(!00 42,8750 0,0728 4,0000 ~VP 010,H02 VE;~IFIC~.TIr')t'~ LISTING PAGE 60 :* FILE TRAIl, ER ** "IhE N A b'tE :~FT1 ,0~. 'ERSION ¢ : ~4,2 ~ATE : [~3t00/00 [AXII~U~,~ LENGTH :1024 'ILE TYPE :PR [EXT FIbF; N'A~E : EOF DATA FORN:AT RECr'~RD ** · YPE SIZE REPR CODE: ENTR'I 1 1 66 0 2 1 66 3 2 79 56 4 1 66 255 5 I 66 0 6 4 73 ~11 7 4 65 I ~.,) C H ~ 4 73 6 9 4 O5 INCH tl 1 66 1.8 16 1 66 ~ 0 66 )A?U~ SPFCIFICATION BLOCKS Ir~ ORIJFR # LOG TYPE CI, AS$ ~00 NO. )EPT F'I' O0 000 O0 0 0 4 ~TIM RFT1 S g8 636 21 O 14 4 'ENS RFT1 [,~ q~ 6~5 21 0 14 4 ~SPE PFT1 RPS ~ 970 01 0 14 4 ;GP PFT1 P$TG gR ~1 4 DO () 14 4 ~S ~FT1 PSIG 98 81 4 00 0 14 4 'DIO ~PT1 g8 81.4 nO 0 14 4 ~O~O F'FT1 9a ~1 ,t nO 0 14 4 ~ONF': PFTI 9~ 814 O0 0 14 4 )'r E ~, F~ F T 1 g t~ a 14 00 0 14 4 ,~UN ~FT1 9a al. 4 O0 0 !.4 4 PROCFSS CODE (OCTAL,) 68 00000000000000 68 ¢)4000000000000 68 04000000000000 60 04000000000000 6~ 04100000000000 68 04000000000000 68 04000000000000 68 04000000000000 6~ 04000000000000 6~ 04200000000000 68 04200000000000 68 04200000000000 ,VP 01,,0,,H02 VERIFICATtF~'~,,! LISTING PAGfil 61 'T H 0 F,' F ? 1 9~ 814 O0 0 I. 4 68 04200000000000 fin 04000000000000 1 5 7 9 1.1. 1.6 REPR COOE 66 79 66 66 73 65 65 66 66 66 n l..,f) C K,5 LOG TYPE Cl.,ASS F T 0 0 00 0 00 s ~8 636 21 I., g q R 635 RPS 9~ 970 Ol PSIG ()8 814 O0 PSIG 98 8t4 00 PSIC . 9~ 814 O0 99 814 O0 qa 814 9a 814 O0 9~ 8 l 4 00 9 9 2 1 4 0 o GAPI 98 310 FI NO, 0 14 1.4 14 1,4 14 14 14 14 14 1.4 1.4 14 SI ENTR¥ 0 0 56 ?.55 0 311. ¢1 6 H 1 SPt., REPR PROCESS CODE (OCTAL) I 68 0000000000t,),1300 1. 68 04000000000000 1 68 04000000000000 I 68 04000000000000 1. 68 04100000000000 t 68 04000000000000 1 68 04.000000000000 1 68 04000000000000 1 68 04000000000000 ,1 68 04200000000000 1 6a 04200000000000 1 68 04200000000000 t 68 04200000000000 1 68 04000000000000 )EPT 65510,1016 ;~P 3418.0000 ~020 0.0679 :THrl 3,0000 ETI,¥: :2,11~0 PRES 3450,0000 PON~: 3,000O GR 16.8437 65654,5938 3407 0000 3,0000 ETI~ 416.4473 PRES 3436,0000 Pf~{E 2.0000 GR 1.40,0000 RPRE TENS RPRE: PTEN 4212,0000 3450.0000 3.0000 MSPE 5,0664 PDIO 0,0718 PHUN 4,0000 4208,0000 aSPE ! 7471. 3436,o00o POlO 0~0728 2.0000 PHI~N 4.0000 icf'd,'It,l,;] ~m ~ [:41 ¥ P 010 o H 02 V E R I F' :[ C z~ T I [) ~ L T. $ T T *',~ C,,,'.; P A G F, 62 :* DA:T~ FOR!,,~iAT RECOi:,',.O ** ;NTR¥ F~L,O CK: S 2 7 (> )AT!}U S PECTF 1C/~T.IC)K. ~.NF..,.~ SFPvICE SVRvlc[[: l [") [3 R O F R t~ $ i ZE REPR .1.., 1. ?, ,1. .1,. 4 C 0 D E 66 66 79 66 66 73 65 73 65 66 66 66 0 0 56 255 0 !18 1 SIZE SPl, REPR CODE 4 I 68 4 1 68 4 1 68 4 I 68 4 1 68 4 1 68 4 1 68 4 1 68 4 1 6g 4 I 6g 4 1 68 4 1. 6~ 4 1 68 4 1 68 PROCESS (OCTAl,) 00000000000000 04000000000000 04000000000000 04000000000000 04100000000000 04000000000000 04000000000000 04,000000000000 H4OOOOOOOOOnO0 042000/)~000000 04200000000n00 04200000000O00 042000 0000C)O 00 04000000000000 i. VP fl],O.14.0~ V~]PIFICAT'I[f~~.~ [;[S?I~G PAGE', 63 N'TNY P~LOCKS ICE S~RV ICE: 1" D OPDER ~ 1 2 3 5 6 7 9 1.6 I 1. 2 1 1 4 4 0 Ir) D E 6 66 '79 66 73 65 73 65 66 66 A Pt API TYPE CheSS OOn O0 0 0 6.36 21 0 '15 635 21 0 15 970 01 0 15 814 O0 0 15 914 00 o 15 al4 O0 0 15 8!,4 of) 0 15 814 O0 o 15 ~14 O0 0 15 .~14 O0 0 81.4 O0 0 15 ~ 14 00 0 15 ~ 10 00 f, 15 SI 0 {l 56 255 0 31 1 I b~CH I ZE SPb REPR CODE 4 1. 68 4 I 6a 4 1 68 4 1 68 4 1 68 4 I 68 4 1 68 4 1 6~ 4 1 68 4 1 6~ 4 1' 6~ 4 1 68 PROCESS (OCTAL) 00000000000000 04000000000000 04000000000000 04000000000000 04100000000000 04000000000000 04000000000000 04000000000000 04000000000000 04200000000000 04200000000000 04200000000000 04200000000000 04000000000000 )EPT 65510,1016 ;CP 3411.0000 '020 0.0679 'THO 3,0000 )EPT 65597.8906 ;GP 37.0000 ~D20 0,0684 'THO 0,0000 'I[,E NA~4E :RFT1 ;ERVICP F:'A H E :LOG rERSIOt~ ~ : 24,2 )ATE :~3/00/00 iAXIMU~' LENGTH :1024 ~'[I,E TYP? : PR ,,. PRES G~ PR~S G P i.9630 3442.0000 6.0000 16.1719 246,2026 57.5000 16,57~1 TENS PTEk PPRE PTE~'.: 4264.0O00 3442.0000 2,OOOO 3310.0000 57.5000 4,000O PD.IO p H U N Pi31 O pHIJ ~ 4.8672 0,0718 4.0000 4,6484 0,071.8 0,0000 YP 010,H()?,~VFRI. F1CA~TIf~t [~IST!NG PAGE .1 ,,~, T E :R3ll0tlg 'RE¥,TOt~S RFE[, 000 000 01.6 065 0 O 0 000 (': o .5 065 r)O0 000 007 065 000 000 003 065 oon 000 004 06,5 ,)00 000 002 065 000 000 00~ 065 nO0 000 006 065 000 000 004 065 1-'l'~l ~ t, i,il ******************************************************************************************* , C~ ~., },~ ! Y P E F !'.~ U I D 'ISCOSITY 250 400 0 7~J,O DF 050 ra 78 0 :202 (~ .'1,5~'0 DF' ~ATtti~4 SPEC%FICATION BLOCKS ID ORDE~ ~ l,Od TYPE ~ E P T V "[' O 0 ~ F I,, U I) I L 0 H ~ ~ 7 0 ;R DIb GAPl 7 31 [PHI F[>N PU 42 6~ ~R~O F[,N OlC3 42 44 ~H O i~ F rj N G / C ~ ~ 2 35 iCNL FDN CPS ~2 34 'C~t,, F"DN' CPS 42 34 fNRA FD~:~ 42 0 IR F'r~~' G~PI 4:~ 31 l 1 ~GT I ~ 0 0 ~ BGT I ~ 0 O c, D,~TA ** )EPT 8200. 0000 SVLU ;P -76,3125 tHOB -99~..2500 I~AT -999,2500 .,2 -999. ~500 )EPT 1~100,0000 S F'I_, LI RF, PR CODE 66 73 65 ./lPI AP1 FILE CItY, SS MOD o o 0 0 0 0 () 0 0 46 0 0 t) 0 0 32 0 0 2 o 0 0 0 0 1. f) 0 92 0 0 93 0 0 3 0 0 1 0 0 0 0 0 32 0 0 0 0 0 0 0 0 3,1777 -152.5000 -g99,2500 -999.2500 2.7891 F; N T ~ Y. 1 60 .lin 0 SI ZE PROCESS SA~P LEVEL 4 0 4 0 4 0 4 0 ~ 0 4 0 4 0 4 0 4 0 ~ 0 4 4 0 ~ 0 4 2,7207 ILD '999,2500 DRHO -990.2500 ChbI -a99.25d0 C!, 2,7207 I[,~D '999,2500 9RNO '999,2500 CALl -999,~500 C1 2,3on9 IbD REPR CODE 68 68 68 68 68 68 68 68 68 68 2,4609 999,2500 :gg9,2,,500 -99g, 2500 2,4395 -999,2500 :g99,2500 g99,2500 2,1934 , V .P 0 ~ 0, F! 02 V E R ! F 1[ C .a. T 'ii 0 ;~.' L. I $ T I N G P A G E 4 ~P rR AT ~2 iP ~2 ~EPT ;p ~EPT ;P IRAT '.2 ) E P T ;P ;P ~R~T ]2 )E P T ;P :2 )KPT ]2 )EPT -23,9687 4 023 2'6816 0000 OC)O0 , 2,4023 2,720 7 7900,0000 -30,7031 7988 a224 7800 0000 2 ,4'146 9 0362 $ F !',,, 0 N C N !'~ hi C N $ F I., U 7Z00,000 59.937 2 , 4,29 2. 933 8.756 7 N C ;,,,t 6 6 R N R ,~ 6 76{)0 0000 2,5625 ,2871 2.67~7 q,56~1 7500. -42.5625 2 5039 2; ~'~4,18 10.7~2% 7.4.00 0000 35~6875 2 2559 0.1770 710(!.0000 -4o.~437 ~.~3~0 3.9590 9.6357 7200. OOO0 SFLU (; R r,I C ~! [..~ N C I',i f_, ;'! C i''~ L, 3,9037 5,0273 ! L 75.0625 N P N 'ii 2,8556 (; 5, I 953 79,7500 24.60,0000 3. 060,6 7,3789 1 L ~,: 2852,0000 2. 9609 108.6250 NPHT 2116,0000 3,2737 !. 96Q7 I 3 3.5 00 0 1'76o. nc~ot) 4.2937 5.0961 ]TI,Fi 45,6055 476.2500 103,3125 4.8320 29,0 0 39 90 ' 5000 73.4.375 4,~1883 29,,805 847,5000 89,0000 5,3789 30.6641 804.500o 74,5000 76,6~75 31.0059 748,5000 44.7500 6.8828 27,1484 987,0(}00 55,5313 3.Jt91. 28.2715 629.0000 109,1,250 1.3975 45.89~.4 405.7500 108,0000 1.8926 69.o234 423.75on !~6.375o 3,2422 D R H 0 CALI Cl I L D DRHO CAt., I ILD CALl C1. i LD D R H 0 CI I L, D D R H 0 C A [., I Cl, I L,D [.) R H 0 CaLl I LD D R N O CAI,[ C1 T bp Dr-t~ O C,a, LI Cl I bD ¢1, I bP,, 0,0479 10, ...... 5 4,.4570 0,0151 9,0781 8,8745 4.3125 0,0430 9,2266 9,34:15 5 21.09 0,0449 9,2813 8,8627 2,5625 70,0854 10,0625 8,5972 6,8047 0,01.42 1(),0938 8.8~27 3,351.6 0,1377 12.1406 8,796q 1.4072 0,0103 10,6328 8.5781 !,.a125 0.0293 1.0,3432 8.7183 3.0762 ,VP 010.~'402 ¥I!~P[F'IC,~TI.f'~,~ T,'TSTI~G PA, GE 5 ,p , E P T ;P ',NOB ~EPT ;p JPAT ~2 ~EPT ;P [PAT ~2 J ,E, PT iR~T ~PT :2 ;P IR~T ~2 ;p IR~7' ~2 -45 4375 2,4023 10.2'!,5'7 71(}0 0000 -4,6 4628 2 3009 3 7734 10 0o00 7000 0000 -5 ,'I, 1875 2 4,473 3 5625 1. 0 97O9 S F' T, U 67¢)0,0000 SFI,,U -29.3906 GR 2,3340 NCNb 3,3477 RNI~A 9,9059 6600 0000 -44 8125 2 4082 3 7090 9 ~432 65O0,00OO -59,6563 2,4316 3,5449 6400 o000 -50i4688 2 40~2 ~.1.855 9.q436 6300. bt C N RaRA ixi C N [, 3.4.3~6 107.0625 NPHI 2058,0000 FCNL 3,7630 GR 2 3379 123 6875 NPHI 19'73 OOO0 FCNL 3 5242 4.3672 118.6875 NPHI 246n 0000 FCNL 3'0123 3..'1.992 J. 26.5625 NP~I 7016,0000 4, I 141 3.496l J. 29.0750 NPPT 1930 0000 ~CUL 3:9147 (iR 4:.3~67 165.6250 ~PHI 2152,0000 3.5462 1.B604 IL~~ 42.0410 3E8,0000 :1,99.12~0 2.5410 4~.7266 189.625o ~.0()20 40,8203 557,5o00 96,8750 2 4063 39,9414 536,00 00 11g.7500 3.0996 26 5137 813:0000 88,9375 1,47~5 38,1836 560.50O0 102.0000 3.1974 43.8965 504.0000 1.37.2500 3.5801 40.5273 536.00n0 ~30.5000 3,4766 ]5,3516 630.0000 164,8750 1.4033 CALI Cl. I i,, D C A [., i C1 I LD ORE 0 CA[., I C, 1, I b !3 DR[tO C.~L1 C1 ILD DRHO CALl Cl I b D DRBO C.h I, I C1 I !:.,D DRHO C_~.L I C1 ILD DR~O CALl ¢1 DRHO C1 !LD 0,0605 i1.,2031 8,9266 2 5059 0,0229 11,5547 8,7376 3,0078 0,0986 1~,8047 ,5335 2 509~ o 0205 10 7969 8 718~ 3 0254 0~1104 1~,5313 8,5728 1.3838 0,0356 :10,2266 3,1.074 0,0508 0 ~906 1'8~5831 3 6211 0~0879 1! 8281 8:4375 3.1426 0,0156 10.17q7 8,6488 !.3350 tEP'T ~P ~HOB !RAT t2 JEPT ~H'OB ~2 )EPT ~HOP, )EPT I~AT '-2 )~PT ;P )KPT ;P IRAT :'2 )F~PT ,IP, AT )E:PT 6.200,0 O 00 -73,0000 GR .2,3 3 2 (.) ~..~ C ~'~ l...., 2,8418 ~,~456 6000 -46 2 3 9 0000 4375 4668 5710 5900,0000 - 52.1250 2. 3652 3,5254 9,1099 {5800. 0000 -50,5938. 2, .2,8887 1(),2993 5700. 0000 SF'L!.i -51.3438 2,3730 3. 3066 5600 0000 -55:9437 GP 2.3184 NCNL, 3,0898 lO. 330O 5500.0000 -53. 5000 2,3574 3.1 ,."4..26 1.0.5834 5400 14. 3 , 8. 750 N P'14 ]' .4 , 0105 (; R 5,496:1, 6,4375 8,0000 3., 1700 .1.00.6875 NPHI 2 ,.1, 4,0000 ¢'Ct~! 63 · 3050 GR 9 13125 [~P[,! i 2136,000() F CM[~ 3 ' 8 120 GR 7. t3125 'NPHI 3.7697 (JR 2,8437 lt,,x! :1. 08.11:~75 FPH[ 2454.O000 FCN[, 3.5116 GR 2,7207 97.1875 NPHI 2252. O00O 3,4628 3,1016 1. I 7,0000 NPq'I 2366. 0000 3.6361 3,0938 43,2129 501,2500 145.0000 3,5203 31.2~88 640,5000 97,4375 2,6270 33,984.4 640,50n0 98,3125 2,1211 39,7949 523.0o00 80.8125 1,8555 40,3809 483.5000 99.6875 3,5.~30 29,4922 735,0000 111.0625 3,0078 36.8652 739,0000 94.3125 2.8633 32.3730 630,5000 ~00,7500 3,2~91 33,1543 698,5000 103,~125 3,2t09 CALl C1 I CAI.,I C! I [, D C A L. I CI DR},tO CALl C1 I bD DRHO C A t, I I nD D R H 0 CAI,I C1 ! LD DR}iQ C .A I., I Cl. O R FI E) CAI, I C1 I I,D DRMf'] CAI,I C1 0.0459 I~,2656 ,5119 3.3047 0,1538 8.6875 8.6~33 2 6387 0,0933 9,6797 8.7929 2 1.465 0 0527 1,0 5938 9 1708 1,865~ 0,0747 1,1.4297 3,5117 0,0117 10.7266 8.6484 3.1074 0.0410 10 6328 8~4419 2.9355 0,0181 11.,1563 8,7482 3,425~ 0.0244 11,2344 3.32~1 3027 656.3 )gPT ;P tROT ~2 t N 0 B ) E P T ;P !R AT J~T ~RAT )EP'F ~P ~ H !n }4 )EPT 530O 0000 -27 4375 2 3359 :3 !582 10 6563 5200. 0000 26. 8437 2,31 () 5 3,7344,: 10.5234 -, 31., , 8906 GR 2 , 3.43 ~ "~ C N b 3 , 7422 R~'<t R A 5000 0000 SFt:U -27 ' 3 o o 6 G !:'~ 3 , 6953 RNRA 11.'P197 4500°0009 105,81,25 NPHI 0000 F C ~! I 2090,4659 GR 3, I 309 ILM 1.03,6875 [gPHI 2160,0000 FC*~I.. 3.3301 (7 ~t 1, l 0 , 1875 ~,7 P H I 21, 12 ,, 00 () 0 F C N' L 4,181 I. gf:~ :117,1250 NPHI 2,5000 IL~.a 98,6875 22an,O000 3,9699 Ga 93,2500 NPHI 2074,0000 F'C',t [, 4.002~ aR a,2500 I1.,~ 196.3!25 2429,0000 3,46~3 92.9375 3.63a4 3.421 36,2793 590,5000 93'3750 2,9961 33,9,355 668,5O00 1.00.7500 2,6'73~ .... i4,1'406 51.6,5000 104,6250 0,8770 43,9941 466.5000 1.06.8750 2,5645 42,8223 518.000() 98,5625 2.7930 42,0410 593.0000 92.8750 2,2539 43,2617 524.000O 107.0625 4,0460 32.1289 702.5000 102.5525 3.2480 36.718~ 634.,00no 96.6250 3,21.09 C .A L I C! ILD CAI..,I C1 I LD D R H 0 C ~ b I ¢1 I LD DRHO C1 I L D DRHO ChbI cl I L, D D R H 0 C ~ L '[ C1 I LD DRND Ca[,I C1 I LD r.) R H 0 C1 I LD r)RHO Cb. LI C1 I b D '0,0073 1~,54'69 ,7122 3 1523 O' ,0303 11,0703 8,6484, $7227 0439 11,4:063 8,'14.~3 0 8389 0.018,1 12 Or.)7 ~ 8 ' 5000 2,6563 0,0493 12,7188 8,4895 2,9941. 0,0078 1.2,2813 8,5978 2.4375 0,0078 11,7344 8,6484 4.1875 0,0166 12,0078 8,6767 3,3184 0,028R 11,8437 g.5781 3.42~'7 R AT :2 ,EPT Y2 ~EPT ;P IRAT ~EPT ;P ;P I~T ~2 )EPT ;P ;P ,IRgT )EPT .,2 )~]PT 4400 0000 -36 0000 2 2227 3 3105 1.1 0795 430o 0000 '34,8750 2,2578 3.'7246 I,.0.7803 4200 0000 2 222? 3 5(')98 10 781 3 41. O0 0000 -42 6875 2 1. ~:~36 3 4609 I0 6514 b' (,'. t,~ L P t',~ P A S F I2, '0' S F L S F' !., U -52: 2 1 10.3723 3800. o0(~0 -65.1,975 2. 0762 g.68r41 3700.n000 -40.3125 2.'29!_0 3..!707 1! 3600.0000 0 625 ~ P H I 00 00 'F C ?,'f L 8893 GR 3,4qa:l. 375 (,) N P I'4 I 9956 GR .3 7832 83,3125 t~!P~4 I 2224.0000 FCt:,t I, 3 ~17] 6,566.4 ILf~ 84;6250 N'PHi 2,000() PCWL 3.7656 (:.~,. 6.6133 I[.,~ 61.0313 NPHI 2166.0000 4.0545 GR 51.6875 2124.0000 FC~L 4.1102 GR ?.R.4063 53,71.88 4.1912 5.3633 fLu 79.2500 NPHI !917.00n0 ~'C?[., 3,7916 Gq 43,7.1 40,1855 552.0000 92,6875 6.2539 36,4746 576,0000 82.7500 .4,5'703 43,9453 476,5000 86,8750 3,a4:1.8 3:9,843'7 564.5000 79.2500 8,2500 39,4043 564.5000 60,1250 6.7344 41.4551 541,5000 72.3750 1.4,0~38 45.1660 513.5000 68,6875 32,6250 46,6797 513 0000 53:0938 5.9359 38,9160 494.%000 81.4375 41.343a C A. LI C1 I L D C ~ t, I ¢1 ! b I) R H 0 C1 I L O CkI.,I C 1, I L D [.) R H 0 Ct~LI C1 I LD 1) R H 0 CALl Ct Ii,.D DRHO C t~ I., I 61 I bD C .~ L I Ct I l., D DRHO C ] I L P o, 0225 11,328!. 8 ;6073 7 0820 0,0615 1.1,4844 8,7171 6484 0332 3750 6472 3,9766 0,0254. 1..9922 1~,6484 9,7500 0,0190 10 9297 8~6168 7,3203 0 0161 1,!:2031 8,652i 16.0781 0,0176 10.5859 8,6468 39.4063 0 0112 10:4063 8.72~3 6.4922 0,0654 12.445~ 8,4375 4.3,0313 RAT 3.6,445 2 1.0.9747 P H O 2 EPT P 2 EPT P RAT 2 ,FPT .P :NOB ~2 ;P IRAT '.2 ~F,.,PT ;P 3300 0000 -40 8't25 1 75OO 4 7344 8 8;263 320O 0000 3'1' .3438 2.1992 3.5742 8,5073 .3!56,375000,000('! ?.109& 3"5000 8,8641 3000.o0~o -38.1250 2.1738 4.0977 o.5318 -49.5938 3.q516 0.3693 -39.6250 4.0R59 9.n313 2700,000© S F' I., U r:,t C ~,! f,, $ F 1'., iJ P'qPA S?I ,~ f,.! C r¢ 35 o 3750 NPH'~ !. ~i! 48,0000 F C N t, 4, ! 683 G ~ ,~ 4 ? ']7 L 7,8_ 64.6975 4.2561 7. 8086 '77.4375 3 · 3936: 10,6563 ZbN 68,6875 NPHI 4,8293 GR 7.031.3 69.8750 NPHI 2r)86.0000 37.3750 NlPHI ~05R.O000 FCNb 3,9068 GR ~. !l 6~-] I6~/, 60.Tfal. 3 19~':]5,0000 4.5221 GR 12.9141. 51.7~13 202!,0000 F'Cql, 4.3965 OR 5, I 7! 9 59,6563 1739.0 o 00 4,433? 455.5000 41.5525 6,6563 45.7520 529,5000 75,3125 ~,57~1 34.6680 595.0000 63.593~ ~,91,4t 62,7930 333,2500 56.5000 g922 42,0410 482,7500 64,0625 12.4297 4,0.1367 508.0000 35.4375 7.3359 51.9043 425.2500 76.81,25 't2.4297 47'.0215 467.0o00 44.5625 7,0273 5].4649 4!0.2500 76.7500 4,9 .'19 ? P R H 0 CAbI el. I C ~; TIJ ][ C A L C 1 l' t,,: D DRHO C ~L I C1 I !~ R H 0 CALl i [.,.D DRHO C h L I C1 I LD DRHO C.~L I Ct DRHD CALl Cl. I LD DRHC) 61 0.0210 I .'t, 4766 11. 1509 6 925~ 0 0386 1t 7~1,3 g 5O92 0,~547 10, 035 10.2734 8,8333 4922 9732 8,97(;6 0,0156 10,4063 10,1032 3,0703 10,0024 10.9375 9.9212 7 8398 0:0171 10.1172 9,5437 13,0000 0.0054 10.3906 9.8220 8 0313 10:0005 10.2891 9,4142 5,7656 2500 g, PT ~T 2600 0000 -37 8125 GP 9 '~61, 1 67. 6875 !, 760. 0000 4,648 ], 60 7500 2104 0000 3 7579 OB 3 '1562 ~R 8, !875 NPHI . ...... ~ [ 174 0000 R~.T 4.' 5742 ~ r,,~ R A. 4, 9t34 2300 0000 ~' .... '~!8. 5938 GR I 5,2813 NPNI -999,2500 ~)CNt,, 990 250() FC~)I., -999 2500 F: 9 GR . R~,~ A - 99.2500 10.13~8 * FILE TR.IlI.,EP, ** II.,E '~.~ h l!E :EPlT ,001 ERVICF, r'1A~ E ,ATE : '! I.,E TYPE : ********** EOF ********** TRAILER ** ~,! .h M E : E D I 'r $ , 4 141 I b D 38,7207 DR.HO ..524,0000 CALl 54,03 13 C 1 14,8047 ILD 42.675~ 529,5000 48,8437 Cl. 6.6523 I I.,, D 59,8.633 DRHO 353,7500 C~.LI 71.1250 C)0,OOn0 ILD 99,2500 -999.2500 Cal,I -999,2500 0,0215 10,~82~ 10,1559 10,3203 0.0039 11,2031 1,0,6868 17 2813 -0 0151 11 7578 10 8906 7,4297 0,0107 10.539~ 10,0738 28 3125 -999.2500 -9~9.2500 0.0781 VP O10.~402 VERIFICg"~Ia:,~ LISTI~G P/XG~.~ 1.~.. EXT REEL EOF EOF