Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout199-045STATE OF ALASKA ~S~"~~'a~-o8 R~~,~,~E~ ALASK~IL AND GAS CONSERVATION CO~SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG MAY 0 9 2008 1 a. Well Status: ^ Oil ^ Gas ^ Plugged ®~Abandoned ^ Suspended 1 b. a ass: ~ OCi 20AAC 25.105 zoAAC zs.>>o , ®Developra~itih~( {~ploratory ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero ^ Service ^ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Ab g 12. Permit to Drill Number BP Exploration (Alaska)Jnc. 3/28/2008 ~~ 199-045 ' 308-046 3. Address: 6. Date Spudded ~ 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 05/22/1999 50-029-20623-01-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 05/24/1999 PBU E-10A~ 353' FNL, 500' FEL, SEC. 06, T11N, R14E, UM Top of Productive Horizon: ~~(]~ 8• KB (ft above MSL): 60.53' ~ 15. Field /Pool(s): _ 631' FNL, 2043' FEL, SEC. ~T11 N, R'~, UM `" Ground (ft MSL): 30.2' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD+TVp) Pool 840' FNL, 1328' FEL, SEC. , T11 N, R E, UM 12718 9023 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 664449 y- 5976710 Zone- ASP4 12784 - 9027 - ADL 028280 ' TPI: x- 658029 y- 5976295 Zone- ASP4 11. SSSV Depth (MD+TVD) 17. Land Use Permit: Total Depth: x- 658749 y- 5976101 Zone- ASP4 N/A 18. Directional Survey ^ Yes ®No 19. Water depth, if offshore 20. Thickness of Permafrost (TVD): Submit electronic and rinted information er 20 AAC 25.050 N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): CNL, GR, ROP, CCL 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" x 30" Insulated Conductor Surface. 110' Surface 110' 36" 8 cu ds Concret 13-3/8" 72# L-80 Surface 2733' Surface 2700' 17-1 /2" 4185 cu ft Arcticset II 9-5/8" 47# L-80 Surface 10847' Surface 8412' 12-1/4" 1565 cu ft Class'G' 130 cu ft AS I 7" 26# L-80 1034 ' 11405' 8034' 8849' 8-1/2" 480 cu ft lass 'G' 2-7/8" 6.16# L-80 10986' 12784' 8517' 9027' 3-3/4" 79 cu ft Class'G' 23. Open to production or injection? ^ Yes ®No 24. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET MD PACKER SET MD (MD+TVD of Top & Bottom; Perforation Size and Number): 4-1/2", 12.6#, L-80 10215' - 11405' 10268' MD ND MD TVD 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 10936' Set EZSV '~~~~ `~ ~ ~~'r ~ ~` ~` ~ 10862' P&A w/ 25 Bbls Class 'G' 10860' Set CIBP 9838' Set EZSV (9838') w/ Whipstock on Top 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date Of Test: HOUrS Tested: PRODUCTION FOR OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: TEST PERIOD Flow Tubing CaSing PreSS: CALCULATED OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): PreSS. 24-HOUR RATE 27. CORE DATA Conventional Core(s) Acquired? ^ Yes ®No Sidewall Cores Ac wired? ^ Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. GilrifAL~11C3Fd None l~ Form 10-407 Revised 02/2007 ~ ~ ~ ~ ~ ~ ! CANTED ON REVERSE SIDE ~~ Lh qty ~ [4 ~rtilp ~ y // 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AN KERS ENCOUNTERED): 29. FORMATION TESTS NAME TVD Well Teste ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. 23N 11461' 8892' None 23P 11466' 8896' 22N 11517' 8928' 22P 11524' 8932' 21 N 11567' 8957' 21 P 11575' 8961' Zone 1 B / 14N 11617' 8980' 14P 11646' 8992' Formation at Total Depth (Name): 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. O S/ Signed Terrie Hubble Title Drilling Technologist Date 07 /~ PBU E-10A 199-045 308-046 Prepared ByNameMumber. Terrie Hubble, 564-4628 Well Number Permit No. / A royal No. Driving Engineer: Mehrdad Nadem, 564-5941 INSTRUCTIONS GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Irera 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only Digital Well File Well: E-10 Well History Well Date Summary • • E-10A 1/2/2008 T/I/0= 140/950/40.. Temp= SI. Tubing FL (pre EL). No A/L line on well. Integral installed on IA. Tubing FL ~ 528'. E-10A 1/11/2008 WELL SHUT-IN ON ARRIVAL. INITIAL T/I/O: 100/950/0 PSI PERFORM GYRO DATA DEVIATION SURVEY FROM SURFACE TO 10944'. STOPPED BY 2-7/8" LINER TOP AT 10944'. LOG CONTINUOUS SURVEY FROM 10944' TO SURFACE. WELL LEFT SHUT-IN. FINAL T/I/O: 0/900/0 PSI. ***JOB INCOMPLETE -CONTINUE RIG DOWN ON 12-JAN-2008*** E-10A 1/12/2008 ***CONTINUED FROM 11-JAN-2008*** WELL SHUT-IN ON ARRIVAL. INITIAL T/I/O: 100/950/0 PSI PERFORM GYRO DATA DEVIATION SURVEY FROM SURFACE TO 10944'. STOPPED BY 2-7/8" LINER TOP AT 10944'. LOG CONTINUOUS SURVEY FROM 10944' TO SURFACE. WELL LEFT SHUT-IN. FINAL T/I/O: 0/900/0 PSI. JOB COMPLETE. E-10A 3/6/2008 T/I/0=110/840/35. Temp=Sl. T, IA, OA FL's (prep for rig sidetrack). TBG FL near surface, IA FL @ surface, OA fl near surface. E-10A 3/8/2008 CTU #6. (Daylight CT) Standby on Well Support finishing rig up on E-10. *** Job continued on WSR 03/09/2008 *** E-10A 3/9/2008 CTU#6 (Dayliight CT) *** Drift Tubing and Depth Control.*** MIRU CTU. Perform weekly BOP test. Makeup Weatherford BHA with 3.70" drift. Bullhead 10 bbls 60/40 meth, 215 bbls 1 %KCI and 35 bbls of 60/40 to load well. During kill, injection rate was 5.2 bpm at 1450 psi with 1 %KCI fluid column. BIH and taa top of liner at 10960' ctm. Pickup 100' and flag CT for depth control on retainer run. At surface, rig back CT and secure well for night. Final WHP after run #1:0/305/100. **' Job continued on WSR 03/10/2008 *** E-10A 3/10/2008 CTU #6 (Daylight CT). Set Cement Retainer. *** Job continued from WSR 03/10/2008 ***. Makeup BHA #2, Halliburton 4-1/2" EZ Drill SVB Squeeze Packer and setting tool. RIH and correct depth at flag set 100' above top of liner (+6' correction for toolstring change). Set retainer at 10936' er Halliburton procedure. After lu set, tubin and IA ressure tracked and wellhea pressure went rom psi to 700 psi in 2 bbls. Tag plug an set own weig on p ug without moving. POOH bleeding IAP and OAP for IA valve work. At surface reload CT with 24 bbls 60/40 meth. Secure well for night. Final WHP = 0/235/0. *** Job continued on WSR 03/11/2008 *** E-10A 3/11/2008 CTU #6 (Daylight CT). Cement P & A. *** Continued from WSR 03/10/2008 *** RIH with Halliburton stabbing tool for cement retainer with 3.66" centralizer. RIH taking returns. Stab into retainer at 10932' ctm. Inject into wellbore with 60/40 meth to insure isolation. Unsting from retainer, pull up 70' above retainer and flag pipe at 10,858' ctm. Circulate 35 bbls of diesel and 140 bbls of 1 %KCI. tin into cement retainer and um 25 bbls of Class G 15.98. At 10 bbls cement throu h retainer, cau ht fluid pressue on ~;T an egan ramping pressure. t 66 sTo cement t roux retainer, ormation locked i on CT pressure. Pull out of retainer and lay in remaining 11 bbls of cement. ratio Tor return rate notes aunng cieanout. ~omaminatea wim bu Dols or i.o ppo esiozan co nag wain c passes from 10028',to f~la Pump 3.5 bpm wit ° and wash from flag to surface, making up/down/up pass on all jew~ry and tree. RIH and freeze protect tubing from 2200' with 60/40 meth with 40 bbls. POOH. At surface, cycle master and swab valve. Hang freeze protect tag on master valve. CTU crew rigged off wellhead and secure location for night. Notify pad operator of well status. Final WHP = 0/530/500. *** Job complete *** E-10A 3/11/2008 T/I/OA= SI/225/0 Troubleshoot 3" model 75 FMC valve on the IA. Timed valve and greased, had to bleed some gas and fluid to tiger tank. Valve holds after grease. E-10A 3/13/2008 T/IA/OA=0/500/0 Temp=cold PPPOT-T (PASS) PPPOT-IC (PASS) (Pre Sidetrack) PPPOT-T RU 2 HP bleed tools onto THA 50 psi bleed to 0 psi. Pressured to 5000 psi for 30 minute test, 5000/ 15 minute, 5000/ 30 minute. Bleed void to 0 psi RD test equipment. Cycle and torque LDS "Standard style" all functioned several were extremely tight but after being ran in and out no problems. PPPOT-IC RU 1 HP bleed tools onto IC test void 50 psi to 0 psi. Pressured to 3500 psi for 30 minute test, 3400/ 15 minutes, 3400/ 30 minutes. Bleed IC void to 0 psi, RD test equipment. Cycle and torque LDS " Standard style" all functioned several were extremely tight but after being ran in and out no problems. E-10A 3/14/2008 ***WELL S/I ON ARRIVAL*** RAN 2.50" SAMPLE BAILER DRIFT TO 10868' SLM (RECOVERED 1/2 CUP CEMENT) JAGGED 10863' SLM W/ 3.70 CENT ***WELL LEFT S/I PAD OP NOTIFIED*** http://digitalwellfile.bpweb.by.com/WIInfo/Reports/ReportViewer. aspx Page 1 of 2 4/19/2008 Digital Well File E-10A 3/15/2008 • • Load and travel to location- Spot equipment and rig up. ***Continued on 3-16-08*** E-10A 3/16/2008 T/I/0=160/660/0 CMIT TxIA FAILED to 3500 psi, MIT OA PASSED to 2000 psi [Side Track prep] Pumped 18.9 bbls cru e, s /40 down Tubing. TBG psi would drop +/ - 750 psi psi in 15 min and IA would lose +/ - 130 psi. over 15 min. (Attempted 7 tests) (See DATA Tab) Bled TBG/ IAP (7.6 BBLS) MIT OA to 2000 psi. pumped 2.6 bbls crude down OA to pressure up to 2000 psi. OA lost 0 psi in 15 min and 0 psi in 2nd 15 min for a total loss of 0 psi over 30 min. Bled OAP (2.2 bbls) ***Wellhead valves checked for position and tags hung upon departure*** FWP's=1100/1480/0 E-10A 3/20/2008 ****WELL SHUT-IN ON ARRIVAL**** (E-LINE SET CIBP /JET CUT). INITIAL T/I/0:780/1150/0. RIG UP E-LINE. ****JOB CONTINUED ON 21-MAR-2008**** E-10A 3/21/2008 ****JOB CONTINUED FROM 20-MAR-2008**** TAGGED CEMENT TOP AT 10.862' SET BAKER 4-1/2" CAST IRON BRIDGE PLUG MID ELEMENT AT 10.860'. E-10A 3/21/2008 T/I/0= 100/1000/0 Temp= S/I Circ out, CMIT TxIA to 3500psi (Rig ST prep) *** Job continued on 3-22-08 WSR*** E-10A 3/22/2008 *** Job continued from 3-21-08 WSR*** Circ out, MIT TxIA FAILED to 3500 psi (Rig ST prep) Pumped 5 meth, 1081 bbls 1 % KCL down TBG and taking returns up A throng jumper ine to~C`Fsumped 151 bbls of 60* diesel and let U-tube for TBG/ IA freeze protect. CMIT TxIA Pumped 12.2 bbls diesel to reach test pressure. 3500 psi 1st test 1st 15 min lost 340/340 psi re-psi w/1.2 bbls 2nd test 1st 15 min lost 340/340 psi Bled TBG and IA pressure (approx. 10 bbls) Pumped 5 bbls meth, 112 bbls crude and 10 bbls diesel down FL to freeze protect. FWHPs=0/0/0 E-10A 3/22/2008 T/I/0= 0/0/0; Set 6-3/8" CIW "J" BPV thru tree; 1-2' ext. used, tagged C~3 108" ***Complete*** (Best/Wortham) E-10A 3/22/2008 T=O; Set 6-3/8" CIW "J" BPV thru tree; 1-2' ext. used, tagged @ 108'; ***Complete*** (Best/Wortham) Print Date: 4/19/2008 Page 1 of 1 http://digitalwellfile.bpweb.bp.com/WIInf o/Reports/ReportViewer. aspx Page 2 of 2 4/19/2008 • BP EXPLORATION Page 1 of 14 Operations Summary Report Legal Well Name: E-10 Common Well Name: E-10 Spud Date: Event Name: REENTER+COMPLETE Start: 3/23/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 4/9/2008 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task .Code NPT Phase Description of Operations 3/22/2008 12:00 - 14:00 2.00 MOB P PRE Pull pits away f/rig. 13:00 - 16:00 3.00 MOB P PRE Move Iliamna Camp, truck shop f/P2-45 to E-10. Rig maintenance, CO brushes on top drive. Balance bearings on mud pumps. 16:00 - 22:00 6.00 MOB P PRE Move pits f/P2-45 to E-10. Bridle up, lay over derrick. Pull rig off P2-45 after notifying pad operator. Stage on pad. 22:00 - 00:00 2.00 MOB P PRE Move 7ES sub f/P2-45 to E-10. 3/23/2008 00:00 - 02:00 2.00 MOB P PRE Move 7ES substructure f/P2-45 to E-10. 7ES on standby ready to move on E-10. Accept rio on standbv at 02:00. 02:00 - 19:00 17.00 MOB N WAIT PRE Stage sub on E-Pad. Raise derrick, prepare rig to move on E-10. Waiting on Drill Site Support to move wellhouse and prepare location. Rig maintenance. CO oil in top drive. CO heat exchanger on casing tong hydraulic pump. CO tube oil pump for topdrive. Hang tree in cellar. Clean and mop and then mop and clean. 19:00 - 23:00 4.00 RIGU P PRE Move sub over E-10. Level rig. Spot pits, tie in pits to sub w/hoses and lines. 23:00 - 00:00 1.00 RIGU P PRE RU circulation lines on wellhead. Prep rig floor. 3/24/2008 00:00 - 02:00 .2.00 WHSUR P DECOMP Take on brine into pits. Accept rig over well. OA, IA, Tbg all 0 psi. RU and pump 2.7 bbls to test OA to 2000 psi f/30 mins Good test. 02:00 - 03:00 1.00 WHSUR P DECOMP PU/RU Drill Site Maintenance Lubricator. Test to 500 si. Pull BPV. LD DSM lubricator. 03:00 - 07:00 4.00 WHSUR P DECOMP Reverse circulate clean 8.5 ppg seawater down the annulus through tubing cut at 10215' and displace 26 bbls diesel f/tubing 138 gpm, 200 psi. Swap pumps to tubing and pump 50 bbls Safe Surf O ahead of seawater. Circulate out 154 bbls diesel plus Safe Surf O until clean 210 gpm, 360 psi. Overboard diesel and contaminated seawater directly to Drill Site Maintenance diesel disposal tank. Monitor well. 07:00 - 08:00 1.00 WHSUR P DECOMP FMC dry rodded TWC in place. Test f/above to 1000 psi. (No test possible f/below.) 08:00 - 10;00 2.00 WHSUR P DECOMP ND tree. 10:00 - 13;00 3.00 BOPSU P DECOMP NU BOP stack. 13:00 - 13:30 0.50 BOPSU P DECOMP Prepare f/BOP test. Fill stack and check f/leaks. 13:30 - 20:30 7.00 BOPSU P DECOMP Test BOPs 250/3500 psi low/high pressure. Test witnessed by Larry Wurdeman/Biff Perry NAD toolpushers, Mike Dinger, Lowell Anderson BP WSLs. Bob Noble AOGCC waived AOGCC presence during testing. Tests 1-11 w/4" test jt. in place. 1. Top rams, choke valves 1,2,3,16, HCR kill, dart valve, top drive upper IBOP. 2. Top pipe rams, choke valves 4,5,6, manual kill, manual IBOP. 3. Choke vavles 7,8,9, TIW. (Choke valve # 9leaking--rebuild #9). 4. Super choke and manual (B) choke. 5. Choke valves 10, 11, 15. 6. Choke valve 14. 7. HCR choke. 8. Manual choke. 9. Annular preventer tested to 3500 psi. 10. Retest choke valve # 9 after rebuilding it. Printed: 4/21/2008 1:16:57 PM • BP EXPLORATION Page 2 of 14 Operations Summary Report Legal Well Name: E-10 Common Well Name: E-10 Spud Date: Event Name: REENTER+COMPLETE Start: 3/23/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/9/2008 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Gode NPT Phase. Description of Operations 3/24/2008 13:30 - 20:30 7.00 BOPSU P DECOMP 11. Koomey test: System pressure after closure = 1700 psi. 17 sec to 200 psi increase/1 min 24 sec to full recovery system pressure at 3000 psi. 1875 psi average nitrogen bottle charge pressure. Test w/4.5" test jt: 12. Top pipe rams w/4.5" jt. 20:30 - 22:00 1.50 BOPSU P DECOMP RU Drill Site Maintenance Lubricator. Test to 200 psi. Check IA--no ressure, no ow. u to su ace. lubricator and clear floor. 22:00 - 23:00 1.00 PULL P DECOMP MU drill pipe jt to 7" IJ4S XO and screw into hanger per FMC. 6.5 (urns to right. Back out lock down screws 3.5". Unseat hanger w/140K PU and ull to floor. Control line shielded cable in good shape and attached to hanger. 23:00 - 00:00 1.00 PULL P DECOMP CBU. 623 bbls 8.5 ppg seawater at 10 bpm/480 psi. RU tbg handling equipment and Schlumberger spooler while circulating. 3/25/2008 00:00 - 01:00 1.00 PULL P DECOMP Install 4.5" TDS XO on safety valve and stand back on peg ready f/use. Cut and seal ends of encapsulated control line. LD tubing hanger. MW = 8.5 ppg seawater. 01:00 - 03:00 2.50 PULL P DECOMP Pull and LD 4.5" TDS tubing Its f/surface to 2085', Spool encapsulated control line. Recover 26 of 26 clamps and 6 of 6 SS bands. 03:00 - 03:30 0.50 PULL P DECOMP LD 4.5" Schlumberger Bal-O SSSV Nipple. RD Schlumberger Spooling Unit. 03:30 - 09:30 6.00 PULL P DECOMP Continue to POOH with 4.5" tubing from 10,215' MD. LD 19.1' cut tubing joint. pulled a total of 255 tubing joints. RD tubing handling equipment, clear and clean the rig floor. 09:30 - 11:00 1.50 BOPSU P DECOMP RU ressure testin a ui ment and test lower rams to 250 si low, 3500 si hi h. RD testing equipment. Replace rubber on test plug. Install wear bushing. 11:00 - 13:00 2.00 EVAL P DECOMP Service the top drive and drawworks. Slip and cut 126' of drilling line. Adjust brake on drawworks and service crown 13:00 - 17:00 4.00 EVAL P DECOMP PJSM with SLB E-line crew. Spot E-line unit and RU Sheaves. MU 8.52" gauge ring, CCL and gamma ray tool. Unable to work gauge ring past 2573' MD. POOH with E-line and change to 8.5" gauge ring. Unable to work past 2573' MD. Consult with Anchorage team and RD SLB E-line tools and Sheaves. 17:00 - 18:30 1.50 CLEAN P DECOMP Load pipe shed with heavy weight drill pipe and collars. 18:30 - 20:30 2.00 CLEAN P DECOMP PJSM with hands to pick up Baker scraper BHA. PU BHA to include: Bull Nose, Casing Scraper, Bit Sub, Bumper Sub, Jars, 9 Drill Collars, and 15 jts of HWDP. RIH to 758' MD. 20:30 - 22:30 2.00 CLEAN P DECOMP RIH with scraper picking up 4" drill pipe singles to 2573' MD. Wore scraper over trou a spot 3 times less than 5K bounce on weight indicator first time through). Continue in hole to 3052' MD PU = 87K, SO = 85K. Printed: 4/21/2008 1:16:57 PM • BP EXPLORATION Page 3 of 14 Operations Summary Report Legal Well Name: E-10 Common Well Name: E-10 Spud Date: Event Name: REENTER+COMPLETE Start: 3/23/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/9/2008 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/25/2008 22:30 - 00:00 1.50 CLEAN P DECOMP Circulate 247 bbls. Paraffin and unkown white substance on bottoms up. Continued to circulate hole clean. POOH with scraper racking back 4" drill pipe. 3/26/2008 00:00 - 01:00 1.00 CLEAN P DECOMP Continue to POOH with scraper racking back drill pipe, jars, drill collars, and heavy weight. 01:00 - 01:30 0.50 CLEAN P DECOMP MU a Baker cleanout BHA with full gauge 8.5" string mill. RI to 7 5 BHA detail: Bullnose, Scraper, Bit Sub, Upper Whipstock Mill, Jar, 9 Drill Collars, and 15 HWDP. 01:30 - 07:30 6.00 CLEAN P DECOMP RIH with 8.5" string mill to 10,130' MD picking up 4" drill pipe singles. No problems while running through previous tight spot at 2573' MD. 07:30 - 09:30 2.00 CLEAN P DECOMP Circulate a 40 bbls high vis sweep. 543 gpm, 2660 psi. PU 190K, SO 120K. Monitor well. 09:30 - 13:00 3.50 CLEAN P DECOMP POOH with string mill to 764' MD racking back stands of drill pipe. 13:00 - 14:00 1.00 CLEAN P DECOMP PJSM, rack back heavy weight pipe and drill collars. t~ LD string mill and casing scraper. 14:00 - 18:30 4.50 EVAL P DECOMP PJSM with SLB E-line crew and rig hands. RU E-line and RIH with 8.5" gauge ring, junk basket, CCL and amma ray to 10,150' MD. Log from 10,150' to 9500' MD. POOH with E-line. Junk basket contained a small amount of paraffin and a 1" x 6" piece of rubber. 18:30 - 20:30 2.00 DHB P DECOMP MU a 9-5/8" Halliburton EZSV bridge plug. RIH with EZSV, CCL and gamma ray on E-line to 9950' MD. Tie depths into previous E-line run and set EZSV. To of EZSV at 9848' MD. 20:30 - 22:30 2.00 DHB P DECOMP POOH with E-line and rig down. 22:30 - 00:00 1.50 DHB P DECOMP PJSM with Halliburton and rig crew. MU Halliburton RTTS and RIH on 4" drillpipe stands to 2475' MD. 3/27/2008 00:00 - 12:00 12.00 DHB P DECOMP RIH with a Halliburton RTTS to track down leak in the 9-5/8" casing. Set RTTS at the following dept wit a test to si: 3519' MD: above good test for 30 minutes, below 400 psi bleed off in 10 minutes. 5049' MD: above good test for 10 minutes. 7528' MD: above good test for 30 minutes, below 800 psi bleed off in 10 minutes. 8580' MD: above good test for 10 minutes, below 1000 psi bleed off in 10 minutes. 9248' MD: above good test for 10 minutes, below 700 psi bleed off in 5 minutes. 9821' MD: below good test for 10 minutes. 9535' MD: above good test for 30 minutes, below 900 psi bleed off in 5 minutes. Printed: 4/21/2008 1:16:57 PM • • BP EXPLORATION Page 4 of 14 Operations Summary Report Legal Well Name: E-10 Common Well Name: E-10 Spud Date: Event Name: REENTER+COMPLETE Start: 3/23/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 4/9/2008 Rig Name: NABOBS 7ES Rig Number: Date From - To -Hours Task Code NPT Phase Description of Operations 3/27/2008 00:00 - 12:00 12.00 DHB P DECOMP Conclusion: 9-5/8" casin leak is between 9535' and 9821' MD. 9-5/8" casing holds pressure to 3500 psi for 30 minutes from 9535' MD to surface. 12:00 - 15:00 3.00 DHB P DECOMP POOH with RTTS and rack back 4" drillpipe to 2379' MD. 15:00 - 15:30 0.50 DHB P DECOMP Perform a well kill drill with rig hands. Blow down Tines. 15:30 - 16:30 1.00 DHB P DECOMP Continue out of hole. Rack back heavy weight drill pipe and lay down RTTS. 16:30 - 00:00 7.50 EVAL P DECOMP PJSM to RU SLB E-line. Spot E-line unit and rig up sheaves. MU and RIH with corrosion logging tool. Log from 9848' MD to 4000' in corrosion mode. 3/28/2008 00:00 - 03:00 3.00 EVAL P DECOMP Continue to log in corrosion mode from 4000' to surface with SLB E-line. RD E-line and clear the floor. Wrap wellhead in herculite and apply steam in preparation for packoff change out. 03:00 - 06:30 3.50 WHSUR P DECOMP Rig up to change out 9-5/8" casing packoffs. Pull the wear bushing and pick up packoff running tool. J into casing packoff and backout the lockdown screws. Pick up 15K and work bails to free packoff. Pull ackoff throu h stack to ri floor and run in with new ackoff. Run in the lockdown screws and test packoff to 3500 psi for 30 minutes. Lay down the running tool and install the wear bushing. 06:30 - 08:30 2.00 STW HIP P WEXIT Clear the rig floor and rig up to run Whipstock. MU and RIH with the followin Whi st k B anchor, slide, window mill, lower mill, flex joint, upper mill, 1 jt HWDP, float sub, MWD w/UBHO, bumper sub, 9 drill collars, and 15 jts of HWDP. 08:30 - 09:00 0.50 STWHIP P WEXIT Shallow hole test the MWD at 1324' MD. 500 GPM, 670 psi. Blow down the top drive and continue to trip in hole. 09:00 - 13:30 4.50 STWHIP P WEXIT Trip in hole with Whipstock BHA on 4" drill pipe stands to 9733' MD. Fill drill pipe every 30 stands. PU 176K, SO 142K. 13:30 - 14:00 0.50 STWHIP P WEXIT Bring on pumps and obtain MWD signals. Orient the Whipstock to 22 degrees right of high side. RIH and set bottom trip anchor with 20K. Pick up with 10K overpull to confirm anchor set. Set down 45K under slack off weight to shear mills from slide. " Top of 1=ZSV ~ 9~ 9Q`MD. 14:00 - 15:30 1.50 STWHIP P WEXIT Pump a 50 bbl spacer and displace the well to 10.4 ppg LSND milling fluid. 500 GPM, 2240 psi. ~~}- Obtain slow pump rates at 9807' MD, 7621' TVD. ~ F;.tin$ 15:30 - 00:00 8.50 STWHIP P WEXIT Mill 8.5" window pumping 25 bbl Super Sweeps as needed. Printed: 4/21/2008 1:16:57 PM ~~ E-10~'~ ~ ~T ~~~ 2,194` - 4-1/2" BKR 3.813" ID X Nipple 2,512` - 9-5/8" DV PKR 2,733` - 13-3/8" 72#, L-80, ID-12.347" 9,458` - 7" 26#, L-80 BTC-M Liner Hanger ,458` 9-5/8" x 7" BKR ZXP PKR ~,~.817` -TOW 9834' -BOW ~N ~~~~" -Top of 9-5/8" EZSV .9,838` -Bottom of 9-5/8" Baker Whipstock TREE = 6" CM/ WELLHEAD = FMC ACTUATOR = AXELSON KB. ELEV = 28.05 BF. ELEV = 27.41 KOP = 2100' Max Angle = 92 degrees Datum MD = 13,060 Datum TV D = 8800' SS Minimum ID = 3.725" @ 10654' 4-1 /2" XN NIPPLE GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 3769 3500 47 KG62-1R DOME BK 16 04!19108 2 7348 5910 51 KG62-1R SO BK 20 04f19?08 1 10272 7998 31 KG62-1R DMY BK 0 03/31/08 10,5 9` - 4-1/2" 3.813" ID X Nipple 10 90" - 7" x 4-1/ BKR S3 Pack. P 1 ,623` _ 4-112" .813" I} X Nipp 0,854` - 4-1I2" 3.725" IQ XN N' ple 10,667' - V1/ - = G 10,667` - 4- 2", 12.6#, 13Cr- 0 VAMTOP Tubing 10,858' - " x 5" ZXP w/10' BS & Hanger Liner Top} 10,825` - 7", 2, L-80, C-M Shoe 2" 12.6#, L-80, IBT-MOD PBTD - 12,981` MD TD 13,060` MD PERFORATION SUMMARY REF LOG: ??????? ANGLE AT TOP PERF: 91 @ 12125' te: Refer to Production DB for historical perf data SPF INTERVAL Opn/Sqz DATE 6 12125 - 12250 O 04/07/08 6 12340 - 12970 O 04/07/08 DATE REV BY COMMENTS DATE REV BY COMMENTS 08/18/81 ORIGINAL COMPLETION 04/10/08 /TLH CORRECTIONS 05/26/99 JAM SIDETRACK (E-10A) 04!26/08 CJN/SV GLV CO (04/19/08) 03/05/02 RN/TP CORRECTIONS 09/21/06 DRF/PAG SET PLUG, PULL ECLIPSE PKR 07/22/07 JSR/PJC PULL PLUG/ SET LTTP (06/17/07) 04/09/08 N7ES SIDETRACK (E-10B) PRUDHOE BAY UNfr WELL: E-106 PERMIT No: '2080300 API No: 50-029-20623-02-00 SEC 6, T11 N, R14E, 500' FNL & 353' FEL BP Exploration (Alaska) 04/09/08 ~u ~~~~~m~~~~~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth i .,,. no~~.rn+~.,., NO. 4657 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay, Endicott, Orion Hare RI Cnlnr Cn 03-10 12045070 USIT -~ 03/24/08 1 1 1-21/K-25 11998996 USIT 03/25/08 1 1 V-223 12061688 CEMENT EVALUATION LOG /(p 03!23/08 1 1 V-214 11978449 MI INJECTOR V - ((p ~ O 04/01/08 1 1 18-13B 12061689 PRODUCTION PROFILE '~_~-( '~ 03/27/08 1 1 E-10A 11998994 USIT (~ '~- 03/28/08 1 1 02-12B 11628789 MCNL a / ! U 08/21/07 1 1 15-456 11963079 MCNL Q 02/14/08 1 1 V-220 12031459 CH EDIT PDC GR (USIT)~(y~ /(o O 03/07/08 1 V-214 40016214 OH MWD /LWD ? _-.,,_.__ 04/01/08 2 1 ~~ 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETUHNINCa VNt GUPY tAlai I U: BP Exploration (Alaska) Inc. '~ Petrotechnical Data Center LR2-1 - 900 E. Benson Blvd. Anchorage, Alaska 99508 ; , ~ t,, d~~ Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-28 ATTN: Beth \ Received b Y • E-l0A P&A • • Maunder, Thomas E (DOA) From: Regg, James B (DOA) Sent: Wednesday, March 05, 2008 12:14 PM To: Nadem, Mehrdad Cc: Maunder, Thomas E (DOA); DOA AOGCC Prudhoe Bay Subject: RE: E-10A P&A Mehrdad - Page 1 of 2 I have reviewed the proposed abandonment change for PBU E-10A PTD 199-045). Sundry approval 308-046 was granted on February 15, 2008 authorizing BP to plug back - or si etrack drilling. Your requested change is approved as outlined below. Since work has not commenced under this sundry approval, there is no need to send a new 10-403 -this email and your request should be sufficient to amend sundry approva1308-049. 1) Set cement retainer @ 10,936 ft (50 ft above 2-7/8" tubing cut @ 10,986 ft MD) -approved; this is a variance to the requirements of 20 AAC 25.112(c)(1)(D) which requires the retainer to be within 500 feet of the perforated interval; new setting depth for the cement retainer will be 774 ft above perforated interval since cannot be set in 2- 7/8" tubing. 2) Cement volume -pump 13 barrels of cement for this abandonment (your request was for 9 bbls). Cement calculations are as follows: 4.5" from retainer to top of 2-7/8" (50 ft) - 0.8 bbls 2-7/8" x 4-1/2" annulus to Baker Anchor packer @ 11420 ft MD (434 ft) - 3.5 bbls 2-7/8" to CIBP @ 12185 ft MD (1199 ft) - 6.9 bbl Perfs squeeze -1.5 bbl (your number) Contact me if you have any questions. Jim Regg AOGCC 333 W.7th Avenue, Suite 100 Anchorage, AK 99501 phone: 907-793-1236 fax: 907-276-7542 c~i<f~ BAR ~ ~ 2ao~ From: Nadem, Mehrdad [mailto:NademM@BP.com] Sent: Wednesday, March 05, 2008 9:54 AM To: Regg, James B (DOA) Cc: Maunder, Thomas E (DOA) Subject: E-10A P&A Jim, I am requesting a change to the P&A of E-10A. The purpose of this request to comply with the intent of 20 AAC 25.112 (D). As discussed, we can not set a retainer inside the coil tubing- 50' above the perforations. However, I am proposing to set the cementing retainer 50' above the 2-7/8" tubing cut at 10,936' MD. The new cementing program for E-10 will be as follows: Plug and abandon the open perforations with 9 bbls of 15.8 ppg cement with retainer set at 10,936' MD - 50' above the 2-7/8" tubing sleeve at 10,986' MD. Squeeze 9 bbls of cement to plug and abandon the perforations. 3/11/2008 E-1 OA P&A Page 2 of 2 Cement volume calculations is based on placing cement on top the CIBP at 12,185' MD. This allows for pumping 1.5 bbls squeezed into the perfs. Best Regards, Mehrdad Nadem Operations Drilling Engineer Phone:907t564-5941 Cell: 907/440-0213 Email: nndemm@bp.com 3/i 1/2008 E-l0A Sundry #30&046 Maunder, Thomas E (D4A) From: Maunder, Thomas E {DOA) Sent: Wednesday, February 27, 2008 2:03 PM To: 'Nadem, Mehrdad' Subject: RE: E-10A Sundry #308-046 No problem Mehrdad. I guess t didn't catch the digit switch either. ~~~ ~~~ Tom Maunder, PE AOGCC Page 1 of 1 From: Nadem, Mehrdad [mailto:NademM@BP.com] Sent: Wednesday, February 27, 2008 1:51 PM 70: Maunder, Thomas E (DOA) Subject: E-l0A Sundry #30$-046 ~ir~ ~ FE~ j ~ ~~~~~ Tom, My dyslexia cuts up with me at times. As such, I would like to request for the folk~nring correction on the E-10 Sundry. Please let me know if you have nay questions regarding his request. 4..fet cut the 4-112° tubing one full joint above the 4-112° PBR seal assembly at ~10,24~'-~;~4~=. Tubing tally is dated May 20, 1990. Best regards, Mehrdad Nadem Operations Drilling Engineer Phone: 907/564-5941 Cell: 907!440-0213 2r2~r2oog • i ~ ~ ~ -~ ~~ ~ ~ SARAH PALIN, GOVERNOR taittl~7i~t~ OIL A1~TD (iAs 333 W. 7th AVENUE, SUITE 100 COI~TSERQATIOIK COlrII-II5SIOIQ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Greg Hobbs Engineering Team Leader BP Exploration Alaska, lnc. PO Box 196612 ~~~I~ FEB ~. ~ 2000 Anchorage, Alaska 99519-6612 `'V Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU E- l0A (y ~ d Sundry Number: 308-046 ~,~"~ Dear Mr. Hobbs: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day ft the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, ~~~ Daniel T. Seamount, Jr. Chair DATED this day of February, 2008 Encl. `. STATE OF ALASKA ~/-A~ gip" i._. ` ' _ ._ C ,13~ p " ~ ALASKA OIL AND GAS CONSERVATION COMMISSION FEg~ 1yl ~t~ ~ APPLICATION FOR SUNDRY APPROVAL a ~ ~~ ~~~ ~~~ ~c , ~,~il~~ 20 AAC 25.280 „_,,,,„, 1. Type of Request: ®Abandon ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Extension ^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ®Development ^ Exploratory 199-045 3. Address: ^ Service ^ Stratigraphic 6. API Number: - P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20623-01-00 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU E-10A - Spacing Exception Required? ^ Yes ®No 9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s): ADL 028280 ~ 60.53' ` Prudhoe Bay Field i Prudhoe Bay Pool 12. PRESENT WELL CONDITION SUM MARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 12784 ~ 9027 12718 9023 10195 Yes, Multiple asin Len th ize MD TVD Burst Coll se Structur I Condu r 110' 20" x 30" 110' 110' Surface 2733' 13-3/8" 2733' 2700' 4930 2670 intermediate 10847' 9-5/8" 10847' 8412' 6870 4760 Produ ion Liner 1065' 7" 10340' - 11405' 8034' - 8849' 7240 5410 Liner 1798' 2-7/8" 10986' - 12784' 8517' - 9027' 13450 13890 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 11710' - 12700' 9010' - 9022' 4-1/2", 12.6# L-80 11405' Packers and SSSV Type: 9-5/8" x 4-1/2" Baker Ret. 'HB' packer Packers and SSSV MD (ft): 10268' 13. Attachments: 14. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Exploratory ®Development ^ Service ^ Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencin O erations: February 22, 2008 ^ Oil ^ Gas ^ Plugged ®Abandoned 17. Verbal Approval: Date: ^ WAG ^ GINJ ^ WINJ ^ WDSPL Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Mehrdad Nadem, 564-5941 Printed Name Greg Ho bs Title Engineering Team Leader Prepared By Name/Number: Signature Phone 564-4191 Date ~'<<<l08 Terrie Hubble, 564-4628 Commission Use Onl Sundry Number. ~, - ~*~. ~,~ Conditions of approval: Notify Commission so that a representative may witness ~ 7 b..~/ O~~ ^ Plug Integrity C~ BOP Test ^ Mechanical Integrity Test ^ Location Clearance Cz ~` ,~ Ram ~~~°~~~ Oth r e : ~ ~ ~ _ ~t ~ ~ ~" .'~ .'~~- ~1~ ,Q r~ ©. _ ~~ Subsequent Form Required: ~~ APPROVED BY Z' A roved B : COMMISSIONER THE COMMISSION Date Form 10-403 Rev sed 06/2006 Submit In Duplicate O R I G I NA ~ ~~~~`~~~ ~. ~~~~ ~~ ~oo~ • To: AOGCC Date: February 11, 2008 From: Mehrdad Nadem- BPXA GPB Rotary Drilling Subject: E-10A Application for Sundry Approval - P&A for Sidetrack Operations Approval is requested for the proposed P&A of the E-10A. This well is currently shut-in due to inability to determine the source of a small inner annulus leak. The new well is targeted to develop reserves in Ivishak Zone 1 B. The plan is to exit the parent E-10A well bore at 9,830' MD. A whipstock will be run and an 8-1/2" window will be milled in the 9-5/8" casing. An 8-1/2" hole will be drilled to the Top of the Sag River formation. A 7" drilling liner will be run, and will be fully cemented to the liner top. The 6-1/8" well bore then builds to horizontal targeting Zone 1 B. The planned well bore runs horizontally for approximately 1,235'. A 4-112° solid production liner will be run and will be perforated with 150' liner lap into the 7" drilling liner. A 7" tieback will be run and partially cemented. Mehrdad Nadem Operations Drilling Engineer O: 564-5941 Proposed Procedure Pre-Riq Operations: 1. Bleed OA, IA & T to zero psi. PPPOT T & IC. Check the tubing hanger lock down screws for free movement. Completely back out and check each lock down screw for breakage. 2. Plug and abandon the open perforations with 18 bbls of 15.8 ppg cement leaving the top of cement at 10,260' MD. Cement volume calculations is based on placing cement on top the CIBP at 12,185' MD. 3. On E-line drift the tubing to verify TOC. 4. Jet cut the 4-1/2" tubing one full joint above the 4-1/2" PBR seal assembly at 12,245'. Tubing tally is dated May 20, 1990. 5. Circulate the wellbore clean with seawater. Freeze protects the well with diesel (2000' TVD). CMIT T x IA to 3500 psi for 30 minutes. 6. Perform MIT-OA to 2,000 psi for 30 minutes. 7. Set a back pressure valve in the tubing hanger. 8. Remove well house and flow line. Level the pad as necessary. Riq Operations: 1. MI / RU Nabors rig 7ES 2. Pull BPV. Circulate out diesel freeze protection and displace the well to seawater. ® • Page 2 of 3 3. Pressure test MIT-OA to 2,000 psi for 30 minutes. 4. Set TWC and test from below to 1,000 psi for 30 minutes. 5. Nipple down tree. Nipple up and test BOPE to 3,500 psi. Pull TWC. 6. R/U. Pull 4-~/z" tubing from the pre-rig cut at -10,200' MD. 7. R/U E-line. M/U 8-1/2" gauge ring /junk basket /casing collar locator (CCL). RIH and tag tubing stump at 10,200' MD. POOH. 8. On E-line, RIH with HES EZSV. Set bridge plug at 9,855' MD as required to avoid cutting a casing collar while milling the window. POOH. R/D E-line. 9. RU RTTS and RIH to 3,500' MD. Perform a pressure test from above and below to 2,000 psi for 30 minutes. 10. Bleed the pressure. POOH and LD RTTS. ~`~ 11. ND BOP and set back. '`~ ~ ~.12. ND and remove the tubing spool. ,`' 13. Change 9-5/8" pack-off. Install an intermediate casing spool. ~ 14. Test 9-5/8" pack-off seals and flange to 3,500 psi, or as recommended by Cameron Rep. {}~ 15. NU and Test BOP. 16. P/U and RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly on 4" drill pipe. Orient whipstock per Schlumberger Rep, and set on bridge plug. Shear off the whipstock. 17. Displace the well to LSND based milling fluid. Completely displace the well prior to beginning the milling o erations. 18. Mill window in 9-5/8" casing at ± 9,830' MD, plus approximately 20 eyon mi e o win ow. ircu a e well bore clean. 19. Pull up into 9 5/8" casing and perform FIT. POOH. 20. M/U 8-'/z" BHA assembly. RIH, kick off and drill the 8'/i" intermediate section with LSND drilling fluid. 21. Drill ahead to the 7" liner point at top of the Sag River, as per the directional plan. Circulate the well clean, short trip to THRZ or higher as needed. POOH. 22. Change out to 7" rams, and test. 23. MU and run 7", 26#, L-80, BTC-M liner to bottom on drill pipe. Circulate and condition the hole. 24. Cement the entire 7" liner through the 8-1/2" hole and back 150' into the 9-5/8" casing to the liner top. Set the hanger and packer, displace cement with mud. 25. Circulate bottoms up, POOH, VD liner running tool. 26. Test liner to 3,500 psi for 30 minutes after cement reaches its compressive strength. 27. MU &RIH with 7", 26#, L-80, TCII, liner tieback. 28. Sting in and establish seal, P/U to expose ports. 29. Cement the tieback to 3000' MD, bury the seal. The top of the 9-5/8" by 7" annulus will be freeze protected with diesel to the surface. As a contingent the tieback may be cemented to surface. 30. Test the tieback and plug to 3,500 psi for 10 minutes. 31. ND BOP and pick up BOP at wellhead. 32. Install and set weight on slips per Cameron Rep. 33. Cut the 7" casing per Cameron Rep, set BOP back. 34. Install tubing spool with secondary 7" casing in bottom. 35. Test casing hanger flange and pack-off seals to 80% of Casing Collapse or Flange rating (which ever is lower). 36. NU and test BOP. 37. Change out rams to variable and test. 38. Pick up drill pipe and stand back. 39. POOH for directional drilling BHA. 40. M/U the first 6-%8" Dir/GR/Res assembly with an insert bit. 41. RIH to drilling the tieback float equipment, test to 3,500 psi for 10 minutes, and record. 42. Drill out of cement and tieback float equipment to the 7" liner float equipment. Test the liner to 3,500 psi for 30 charted minutes. 43. Displace to 8.4 ppg Flo Pro Fluid. 44. Drill out of cement and float equipment to shoe. 45. RIH, and drill out the 7" shoe plus ~20' new formation, pull up into the shoe and perform a FIT. 46. Drill the 6-1/8" production interval as per directional plan to end of the build section. 47. POOH for bit. E-10A Application for Sundry Page 3 of 3 48. POOH, PU second BHA with a PDC bit. 49. RIH, drill ahead to TD. 50. POOH. UD BHA. 51. MU and RIH to bottom with 4-1/2", 12.6#, L-80 solid liner. This will include 150' liner lap inside the ~" drilling liner. Cement the liner. 52. Set liner top packer and displace well to clean seawater above the liner top. a. A perf pill will be left in the 4-1/2" liner. 53. POOH, UD LRT. 54. Pressure test casing and liner to 3,500 psi for 30 minutes. 55. RU DPC pert guns, RIH and perforate. Perf intervals to be supplied by asset. 56. R/U and run a 4'/i", 12.6#, 13Cr, VamTop tubing completion, stinging into the 4-1/2" liner tie back sleeve. 57. Space out and make up tubing hanger per Cameron Rep. 58. Land the tubing hanger, and run in lock down screws. 59. Set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. Record each test. 60. Set a BPV. 61. Nipple down the BOPE. Nipple up the tree and test to 5,000 psi. 62. Freeze protect the well to 2,200' TVD. Secure the well. 63. RD and Move Off. Post-Rig Operations: 1. MI / RU slick line. Pull the ball and rod / RHC plug from landing nipple below the production packer. 2. Replace the DCK shear valve with a dummy GLV. 3. Install well house and instrumentation. E-10A Application for Sundry TREF = 6" CNV WELLHEAD = FMC ACTUATOR = AXELSON KB. ELEV = 60.53' BF. ELEV = 32.36' KOP = 2100' Max Angle = 94 @ 12515' Datum MD = 11420' Datum TV D = 8800' SS -10 A S NOTES: 70° @ 11652' & 90° @ 12006' i~:a 13-3/8" CSC, 72#, L-80, ID = 12.347" ~-~ 2733' Minimum ID = 3.0" @ 10986' BKR GS SLEEVE 2082' ~-j4-1/2" SSSV CAMCO LANDING NIP, ID = 3.813" I GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 1 3146 6008 3000 5000 36 50 CAM CAM DMY **DMY RK RK 0 0 08/12/03 08/12/03 "" J 1 A 1 IVN iF'I = UM Y 11AS tX 1 EIVUFJ.7 PACKING 10195' 4-1/2" PARKER SWS NIP, ID = 3.813" 10195' 4-1/2" PX PLUG SET (09/21/06) 10245' 4-1/2" BKR PBR SEAL ASSY, ID = 4.00" 10268' ~--~ 9-5/8" X 4-112" BKR RET HB PKR, ID = 4.0" TOP OF 7" LNR ~ 10340' 9-5/8" CSC, 47#, L-80, ID = 8.681" 10847' 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.953" 11406' PERFORATION SUMMARY REF LOG: SWS MWD-GR ON 05/24/99 ANGLE AT TOP PERF: 78 @ 11710' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2" 4 11710 - 11730 C 04/23/01 2" 4 11780 - 11830 C 05/26/99 2" 4 11920 - 12019 C 05/26/99 2" 4 12070 - 12250 C 08/12/00 2" 4 12320 - 12700 C 08/12/00 4-1/2" BRIDGE PLUG ~ 11474' PBTD 11758' 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 11800' 101 986• I-1 BKR GS SLEEV E, ID = 3.00" 11263' TUBING PUNCH IN 4-1/2" TO 11267' MILLOUT WINDOW 11406' - 11420' BAKER ANCHOR PKR @ 11420' 11418' RA TAG UNKNOWN SLIP FROM ECLIPSE PKR (09/21/06) 12185' 2-7/8" BAKER CIBP MILLED /PUSHED DOWN 06/02/03 PBTD 1 12718' r 2-7/8" TBG, 6.4#, L-80, .00579 bpf, ID = 2.441" -~ DATE REV BY COMMENTS DATE REV BY COMMENTS 08/18/81 ORIGINAL COMPLETION 09/05/03 BJM/KK SET 4-1/2" ECLIPSE PATCH 05/26/99 JAM SIDETRACK(E-10A) 09/17/03 CMO/TLP P~2FANGLECORRECTION 03/05/02 RN/TP CORRECTIONS 09/21/06 DRF/PAC SET PLUG, PULL ECLIPSE PKR 06/02/03 CJS/TLP MILL /PUSH CIBP 06/19/03 JCMITLH GLV GO 08/13/03 JCMITLH GLV GO PRUDHOE BAY UNff WELL: E-10A PERMff No: 1990450 API No: 50-029-20623-01 SEC 6, T11 N, R14E, 353' SNL & 500' WEL BP Exploration (Alaska) ' E-10B ~ r 2,200' - 4-1/2" BKR Land Nipple 2,512' - 9-5/8" DV PKR 2,733` - 13-3/8" 72#, L-80, ID-12.347" 3,233` - TOC 9,680` - 7" 26#, L-80 TCII Tieback 9,680` 9-5/8" x 7" BKR PKR 9,830` - KOP 9,855` - 9-5/8" EZSV ;~ 7 -10,100' -Tubing Cut -10,260' -TOC TREE = 6" CIW WELLHEAD = FMC ACTUATOR = AXELSON KB. FlEV = 60.53' BF. E1EV = KOP= Max Angle = Datu m MD = Datum TV D = 8800' SS 10,612` - 4-1/2" BKR X Nipple 10,627` - 7" x 4-1 /2" BKR S3 Packer 10,652` - 7" 4-1 /2" BKR XN Nipple 10,622` - 4-1 /2" BKR XN Nipple 10,667` - 4-1/2" - 13C-80 VAMTOP Tubing 10,667` - W LEG 10,667` - 7" x 5" ZXP w/10' TBS Hanger (Liner Top) 10,817` - 7", 26#, L-80, BTC-M 13,084` MD - 4-1/2" 12.6#, L-80, IBT-MOD PBTD 13,084` MD TD 13,004' MD ST MD ND DEV TYPE 4 4-1 /2" x 1 " 3 4-1 /2" x 1 " 2 4-112" x 1" 1 4-1/2" x 1" I PBTD I ~ 2-7/8" TBG, 6.4#, L-80, .00579 bpf, ID = 2.441" ~ 1 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNff 08/18/81 ORIGINALCOMPLEf10N 09/05/03 BJM/KK SET4-1/2"ECLIPSE PATCH WELL: ~10A 05/26/99 JAM SIDETRACK (E-10A) 09/17/03 CMO/TLP PERF ANGLE CORRECTION PERMIT No: 1990450 03/05/02 RN/TP CORRECTIONS 09/21/06 DRF/PAC SET PLUG, PULL C~LIPSE PKR API No: 50-029-20623-01 06/02/03 CJS/TLP MILL /PUSH CIBP 07/22/07 JSR/PJC PULL PLUG/ SET LTTP (06/17/07 ) SEC 6, T11 N, R14E, 353' SNL & 500' WEL 06/19/03 JCM/TLH GLV GO 08/13/03 JCM/TLH GLV C/O BP Exploration (Alaska) • gy data Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713/461-3146 Fax: 713/461-0920 February 1, 2008 State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 • ~t5 ~~Q. n Re: E-Pad, Well #E-10A Prudhoe Bay, Alaska ~ FFB ~. ~. 2~~~' Enclosed, please find two (2) copies, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, i'L~"~'~'~i~, Rob Shoup~~~~ North American Regional Manager RS:kI Serving the Worldwide Energy Industry with Precision Survey Instrumentation • gyro ata Gyrodata Incorporated 1682 W. Sarn Houston Pkwy. N Houston, Texas 77043 7131461-3146 Fax: 713/461-0920 SURVEY REPORT BP E-Pad #E-10A Prudhoe Bay, AK AK0108G_101 12 Jan 2008 .~~~ ~ ~ ~~~. ~ ~~~ ~~~ ~'~ Serving the VVorldwicle Energy Industry with Precision ~~v~y tn~trum~,-rtaS~or; ~~~ ~~~ A Gyrodata Directional Survey for B.P. EXPLORATION Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 Run Date: 12 Jan 2008 Surveyor: Steve Thompson; Michael Villarreal Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.342680 deg. N Longitude: 148.665280 deg. W Azimuth Correction: Gyro: Bearings are Relative to True North Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location C v Horizontal Coordinates Calculated from Well Head Location A Gyrodata Directional Survey B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg, deg. deg. min. deg./ feet feet deg. feet 100 ft. • 0.00 0.00 0.00 N 0 0 E 0.00 0.00 0.0 0.0 0.00 N 0.00 E -------------------------------------------------------------------------------------- 0 - 11000 FT. RATE GYROSCOPIC MULTISHOT SURVEY -------------------- --------------------------- --------------- -------------- ALL MEASURED DEPTHS AND COORDINATES REFERENCED TO ORIGINAL R.K.B. OF 60.53 FT. ------------------------------------------------------------------------------------------------------------------------------------- --------------- -------------- 100.00 0.21 239.32 S 59 19 W 0.21 100.00 0.2 239.3 0.09 S 0.16W 200.00 0.40 193.64 S 13 39 W 0.30 200.00 0.7 217.0 0.53 S 0.40W 300.00 0.46 197.89 S 17 53 W 0.07 300.00 1.4 205.7 1.25 S 0.60W 400.00 0.55 204.04 S 24 2 W 0.11 399.99 2.3 204.0 2.08 S 0.92W 500.00 0.82 210.44 S 30 26 W 0.28 499.98 3.5 205.3 3.13 S 1.48W 600.00 0.83 213.93 S 33 56 W 0.05 599.97 4.9 207.3 4.35 S 2.25W 700.00 0.80 220.77 S 40 46 W 0.10 699.96 6.3 209.6 5.48 S 3.11 W 800.00 0.63 215.17 S 35 10 W 0.18 799.96 7.5 211.0 6.45 S 3.88W 900.00 0.30 208.61 S 28 37 W 0.34 899.95 8.3 211.2 7.13 S 4.32W 1000.00 0.20 194.27 S 14 16 W 0.11 999.95 8.8 210.8 7.53 S 4.48W 1100.00 0.11 168.32 S 11 41 E 0.12 1099.95 9.0 210.0 7.80 S 4.51 W 1200.00 0.14 119.02 S 60 59 E 0.11 1199.95 9.1 208.8 7.95 S 4.38W 1300.00 0.19 101.54 S 78 27 E 0.06 1299.95 9.0 207.1 8.04 S 4.11 W 1400.00 0.20 84.56 N 84 34 E 0.06 1399.95 8.9 205.1 8.06 S 3.78W 1500.00 0.20 59.21 N 59 12 E 0.09 1499.95 8.7 203.4 7.95 S 3.45W 1600.00 0.73 296.35 N 63 39 W 0.86 1599.95 8.5 207.0 7.58 S 3.87W 2 B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. deg. min. DOGLEG VERTICAL CLOSURE HORIZONTAL SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg./ feet feet deg. feet 100 ft. 1700.00 1.49 275.63 N 84 22 W 0.84 1699.93 9.2 218.6 7.17 S 5.73 W 1800.00 2.05 270.43 N 89 34 W 0.59 1799.88 11.3 231.4 7.03 S 8.81 W 1900.00 3.14 264.91 S 84 55 W 1.11 1899.78 15.2 241.4 7.26 S 13.33W 2000.00 6.48 255.81 S 75 49 W 3.42 1999.41 23.3 247.6 8.88 S 21.53W 2100.00 8.66 257.81 S 77 49 W 2.19 2098.53 36.3 251.0 11.86 S 34.36W 2200.00 11.00 255.63 S 75 38 W 2.37 2197.06 53.4 252.8 15.81 S 50.96W 2225.00 11.68 256.03 S 76 2 W 2.72 2221.57 58.3 253.0 17.02 S 55.73W 2250.00 12.40 257.00 S 77 0 W 2.99 2246.02 63.5 253.3 18.23 S 60.80W 2275.00 13.12 257.97 S 77 58 W 3.01 2270.40 69.0 253.6 19.43 S 66.19W 2300.00 13.84 258.94 S 78 56 W 3.02 2294.72 74.8 254.0 20.59 S 71.90W 2325.00 14.78 259.62 S 79 37 W 3.83 2318.94 80.9 254.4 21.74 S 77.97W 2350.00 15.48 259.44 S 79 26 W 2.79 2343.07 87.4 254.8 22.93 S 84.39W 2375.00 16.25 259.25 S 79 15 W 3.11 2367.12 94.3 255.1 24.19 S 91.1OW 2400.00 17.16 259.78 S 79 47 W 3.68 2391.06 101.4 255.4 25.50 S 98.17W 2425.00 17.65 259.64 S 79 39 W 1.96 2414.92 108.9 255.7 26.83 S 105.53W 2450.00 18.50 259.39 S 79 23 W 3.42 2438.69 116.6 256.0 28.24 S 113.15W 2475.00 19.23 259.41 S 79 24 W 2.94 2462.34 124.7 256.2 29.73 S 121.1OW 2500.00 19.80 259.62 S 79 37 W 2.27 2485.91 133.0 256.4 31.25 S 129.31 W 2525.00 20.65. 259.50 S 79 30 W 3.4.1 2509.36 141.7 256.6 32.82 S 137.81 W 2550.00 21.36 259.53 S 79 32 W 2.86 2532.70 150.6 256.8 34.45 S 146.62W 2575.00 22.18 259.53 S 79 32 W 3.27 2555.92 159.9 256.9 36.14 S 155.74W 3 A Gyrodata Directional Survey • • A Gyrodata Directional Survey B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 2600.00 23.34 259.56 S 79 33 W 4.65 2578.97 169.5 257.1 3'1.89 S 165.26W 2625.00 23.88 259.22 S 79 13 W 2.21 2601.88 179.5 257.2 39.73 S 175.1OW 2650.00 24.55 259.20 S 79 12 W 2.70 2624.68 189.8 257.3 41.65 S 185.17W 2675.00 25.36 259.37 S 79 22 W 3.25 2647.34 200.3 257.4 43.62 S 195.54W 2700.00 25.73 259.36 S 79 22 W 1.46 2669.90 211.1 257.5 45.61 S 206.13W 2725.00 26.37 259.24 S 79 15 W 2.59 2692.36 222.1 257.6 47.64 S 216.92W 2750.00 27.61 259.85 S 79 51 W 5.08 2714.64 233.4 257.7 49.70 S 228.08W 2775.00 28.68 260.25 S 80 15 W 4.34 2736.68 245.2 257.8 51.74 S 239.69W 2800.00 30.66 260.99 S 81 0 W 8.05 2758.40 257.6 258.0 53.75 S 251.90W 2825.00 31.52 262.08 S 82 5 W 4.11 2779.81 270.5 258.1 55.65 S 264.67W 2850.00 32.33 263.34 S 83 20 W 4.18 2801.03 283.6 258.3 57.32 S 277.78W 2875.00 32.74 264.00 S 84 0 W 2.18 2822.11 297.0 258.6 58.81 S 291.15W 2900.00 33.04 264.11 S 84 7 W 1.22 2843.10 310.5 258.8 60.21 S 304.65W 2925.00 33.27 264.06 S 84 4 W 0.95 2864.03 324.2 259.0 61.62 S 318.25W 2950.00 33.65 264.12 S 84 7 W 1.49 2884.89 337.9 259.2 63.04 S 331.96W 2975.00 33.95 264.14 S $4 8 W 1.20 2905.66 351.8 259.4 64.46 S 345.79W 3000.00 34.59 263.58 S 83 35 W 2.86 2926.32 365.8 259.6 65.97 S 359.79W 3025.00 34.90 263.66 S 83 39 W 1.26 2946.86 380.0 259.8 67.55 S 373.95W 3050.00 35.15 263.72 S 83 43 W 1.01 2967.34 394.3 259.9 69.13 S 388.21 W 3075.00 35.35 263.83 S 83 50 W 0.82 2987.75 408.7 260.0 70.70 S 402.SSW 3100.00 35.66 264.05 S 84 3 W 1.35 3008.10 423.2 260.2 72.23 S 416.99W 4 • • A Gyrodata Directional Survey B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH B EARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 3125.00 36.10 264.29 S 84 17 W 1.84 3028.36 437.8 260.3 73.72 S 431.57W 3150.00 36.16 263.59 S 83 36 W 1.65 3048.55 452.5 260.4 75.27 S 446.22W 3175.00 37.59 263.63 S 83 38 W 5.70 3068.55 467.5 260.5 76.94 S 461.13W 3200.00 37.78 263.60 S 83 36 W 0.77 3088.34 482.8 260.6 78.64 S 476.32W 3225.00 38.32 263.37 S 83 22 W 2.26 3108.02 498.2 260.7 80.39 S 491.63W 3250.00 38.75 263.29 S 83 18 W 1.70 3127.58 513.7 260.8 82.20 S 507.1OW 3275.00 39.1 S 263.22 S 83 13 W 1.62 3147.02 529.4 260.9 84.04 S 522.7UW 3300.00 39.91 263.30 S 83 18 W 3.03 3166.30 545.3 260.9 85.91 S 538.51 W 3325.00 40.72 263.69 S 83 41 W 3.42 3185.37 561.5 261.0 87.74 S 554.58W 3350.00 41.69 264.08 S 84 5 W 4.00 3204.17 577.9 261.1 89.50 S 570.95W 3375.00 42.89 264.75 S 84 45 W 5.14 3222.67 594.7 261.2 91.14 S 587.69W 3400.00 43.37 264.96 S 84 58 W 1.98 3240.91 611.8 261.3 92.67 S 604.72W 3425.00 43.86 265.32 S 85 19 W 2.19 3259.01 629.0 261.4 94.13 S 621.90W 3450.00 44.02 266.28 S 86 17 W 2.76 3277.02 646.3 261.5 95.40 S 639.20W 3475.00 44.21 267.28 S 87 17 W 2.88 3294.97 663.6 261.6 96.37 S 656.57W 3500.00 44.38 267.32 S 87 19 W 0.71 3312.86 681.0 261.8 97.20 S 674.01 W 3525.00 44.61 266.45 S 86 27 W 2.60 3330.69 698.4 261.9 98.15 S 691.51 W 3550.00 44.91 264.40 S 84 24 W 5.88 3348.44 716.0 262.0 99.55 S 709.OSW 3575.00 45.21 262.90 S 82 54 W 4.43 3366.10 733.7 262.0 101.51 S 726.64W 3600.00 45.55 262.34 S 82 20 W 2.10 3383.66 751.5 262.1 103.80 S 744.29W 3625.00 45.94 261.75 S 81 45 W 2.29 3401.11 769.4 262.1 106.28 S 762.02W 5 • B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. deg. min. DOGLEG VERTICAL CLOSURE SEVERITY DEPTH DIST. AZIMUTH deg./ feet feet deg. 100 ft. HORIZONTAL COORDINATES feet 3650.00 46.16 261.60 S 81 36 W 0.97 3418.46 787.4 262.1 108.88 S 779.83W 3675.00 46.36 261.58 S 81 35 W 0.80 3435.74 805.5 262.0 111.53 S 797.70W 3700.00 46.51 261.52 S 81 31 W 0.62 3452.98 823.6 262.0 114.19 S 815.61 W 3725.00 46.40 261.39 S 81 23 W 0.57 3470.20 841.7 262.0 116.88 S 833.53W 3750.00 46.47 261.32 S 81 19 W 0.34 3487.43 859.8 262.0 119.60 S 851.44W 3775.00 46.55 261.30 S 81 18 W 0.31 3504.63 877.9 262.0 122.35 S 869.37W 3800.00 46.26 261.20 S 81 12 W 1.19 3521.87 896.0 262.0 125.10 S 887.27W 3825.00 46.26 261.15 S 81 9 W 0.14 3539.16 914.1 262.0 127.87 S 905.12W 3850.00 46.03 261.07 S 81 4 W 0.96 3556.48 932.1 261.9 130.65 S 922.93W 3875.00 45.85 260.98 S 80 59 W 0.74 3573.86 950.1 261.9 133.46 S 940.67W 3900.00 45.99 260.97 S 80 58 W 0.53 3591.25 968.0 261.9 136.27 S 958.41 W 3925.00 45.67 261.01 S 81 1 W .1.26 3608.67 986.0 261.9 139.08 S 976.12W 3950.00 45.76 261.08 S 81 5 W 0.39 3626.13 1003.9 261.9 141..87 S 993.80W 3975.00 45.49 261.44 S 81 27 W 1.48 3643.61 1021.7 261.9 144.58 S 1011.46W 4000.00 45.52 261.77 S 81 46 W 0.93 3661.13 1039.6 261.9 147.19 S 1029.1OW 4025.00 45.62 261.98 S 81 59 W 0.72 3678.63 1057.4 261.9 149.71 S 1046.78W 4050.00 45.61 262.27 S 82 16 W 0.84 3696.12 1075.3 261.9 152.16 S 1064.48W 4075.00 45.65 262.40 S 82 24 W 0.40 3713.60 1093.2 261.9 154.54 S 1082.19W 4100.00 45.66 262.51 S 82 30 W 0.32 3731.08 1111.0 261.9 156.89 S 1099.91 W 4125.00 45.59 262.54 S 82 33 W 0.33 3748.56 1128.9 261.9 159.22 S 1117.63W 4150.00 45.71 262.52 S 82 31 W 0.48 3766.04 1146.8 261.9 161.54 S 1135.35W 6 A Gyrodata Directional Survey • • B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. • 4175.00 45.65 262.60 S 82 36 W 0.32 3783.50 1164.7 261.9 163.86 S 1153.09W 4200.00 45.78 262.63 S 82 38 W 0.53 3800.96 1182.6 261.9 166.16 S 1170.84W 4225.00 45.85 262.75 S 82 45 W 0.45 3818.38 1200.5 261.9 168.44 S 1188.62W 4250.00 45.87 263.09 S 83 5 W 0.97 3835.79 1218.4 261.9 170.65 S 1206.43W 4275.00 45.70 263.71 S 83 42 W 1.90 3853.22 1236.3 262.0 172.71 S 1224.23W 4300.00 45.74 264.00 S 84 0 W 0.85 3870.68 1254.2 262.0 174.63 S 1242.02W 4325.00 45.70 264.86 S 84 52 W 2.48 3888.13 1272.1 262.0 176.36 S 1259.84W 4350.00 45.78 265.21 S 85 13 W 1.04 3905.58 1290.0 262.1 177.91 S 1277.67W 4375.00 45.79 265.67 S 85 40 W 1.32 3923.01 1307.9 262.1 179.34 S 1295.54W 4400.00 45.78 266.06 S 86 3 W 1.11 3940.45 1325.8 262.2 180.63 S 1313.41 W 4425.00 45.83 266.19 S 86 11 W 0.43 3957.87 1343.7 262.2 181.84 S 1331.29W 4450.00 45.91 266.35 S 86 21 W 0.56 3975.28 1361.6 262.3 183.01 S 1349.20W 4475.00 45.74 266.47 S 86 28 W 0.75 3992.70 1379.4 26.2.3 184.13 S 1367.09W 4500.00 45.89 266.55 S 86 33 W 0.64 4010.13 1397.3 262.4 185.22 S 1384.99W 4525.00 45.93 266.67 S 86 40 W 0.38 4027.52 1415.2 262.4 186.28 S 1402.91 W 4550.00 45.91 266.74 S 86 44 W 0.22 4044.91 1433.1 262.5 187.32 S 1420.84W 4575.00 45.97 .266.74 S 86 44 W 0.24 4062.30 1451.1 262.5 188.34 S 1438.78W 4600.00 45.81 266.70 S 86 42 W 0.63 4079.70 1469.0 262.6 189.37 S 1456.70W 4625.00 45.64 266.61 S 86 36 W 0.72 4097.15 1486.8 262.6 190.41 S 1474.57W 4650.00 45.27 266.44 S 86 27 W 1.55 4114.69 1504.6 262.7 191.49 S 1492.35W A Gyrodata Directional Survey 7 A Gyrodata Directional Survey B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 4675.00 45.41 266.48 S 86 29 W 0.55 4132.26 1522.3 262.7 192.59 S 1510.1OW 4700.00 45.55 266.47 S 86 28' W 0.56 4149.79 1540.1 262.8 193.68 S 1527.89W 4725.00 45.38 266.51 S 86 30 W 0.67 4167.32 1557.9 262.8 194.77 S 1545.68W 4750.00 45.28 266.72 S 86 43 W 0.74 4184.90 1575.6 262.9 195.82 S 1563.43W 4775.00 45.46 266.90 S 86 54 W 0.90 4202.46 1593.4 262.9 196.81 S 1581.19W 4800.00 45.46 267.40 S 87 24 W 1.42 4219.99 1611.2 263.0 197.70 S 1598.99W 4825.00 45.53 267.49 S 87 29 W 0.37 4237.52 1628.9 263.0 198.50 S 1616.80W 4850.00 45.67 267.57 S 87 34 W 0.59 4255.01 1646.7 263.0 199.27 S 1634.65W 4875.00 45.40 267.67 S 87 40 W 1.10 4272.52 1664.5 263.1 200.01 S 1652.47W 4900.00 45.19 267.67 S 87 40 W 0.85 4290.11 1682.2 263.1 200.73 S 1670.23 W 4925.00 45.31 267.66 S 87 40 W 0.51 4307.71 1699.9 263.2 201.45 S 1687.97W 4950.00 45.04 267.43 S 87 26 W 1.27 4325.33 1717.6 263.2 202.21 S 1705.68W 4975.00 45.21 267.53 S 87 32 W 0.73 4342.97 1735.3 263.3 202.99 S 1723.38W 5000.00 45.23 267.35 S 87 21 W 0.52 4360.58 1753.0 263.3 203.78 S 1741.11 W 5025.00 45.05 267.43 S 87 26 W 0.76 4378.22 1770.7 263.4 204.59 S 1758.81 W 5050.00 45.16 267.44 S 87 27 W 0.47 4395.86 1788.3 263.4 205.38 S 1776.SOW 5075.00 45.25 267.65 S 87 39 W 0.69 4413.48 1806.0 263.4 206.14 S 1794.23W 5100.00 45.47 268.19 S 88 12 W 1.78 4431.04 1823.8 263.5 206.79 S 1812.OOW 5125.00 45.63 268.97 S 88 58 W 2.31 4448.55 1841.5 263.5 207.23 S 1829.85W 5150.00 45.86 269.94 S 89 56 W 2.90 4466.00 1859.4 263.6 207.40 S 1847.75W 5175.00 46.10 269.85 S 89 51 W 1.02 4483.37 1877.2 263.7 207.43 S 1865.73W 8 LJ • B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. deg. min. DOGLEG VERTICAL CLOSURE HORIZONTAL SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg./ feet feet deg. feet 100 ft. 5200.00 46.22 269.92 S 89 55 W 0.53 4500.68 1895.2 263.7 5225.00 45.97 270.05 N 89 57 W 1.09 4518.02 1913.1 263.8 5250.00 45.89 270.10 N 89 54 W 0.36 4535.41 1930.9 263.8 5275.00 46.09 270.12 N 89 53 W 0.80 4552.78 1948.8 263.9 5300.00 45.89 270.19 N 89 49 W 0.81 4570.15 1966.7 263.9 5325.00 45.96 270.22 N 89 47 W 0.29 4587.54 1984.5 264.0 5350.00 45.85 270.46 N 89 32. W 0.81 4604.94 2002.4 264.1 5375.00 45.48 270.70 N 89 18 W 1.65 4622.41 2020.1 264.1 5400.00 45.47 270.74 N 89 16 W 0.13 4639.94 2037.8 264.2 5425.00 45.61 270.77 N 89 14 W 0.55 4657.45 2055.6 264.2 5450.00 45.68 270.77 N 89 14 W 0.29 4674.93 2073.3 264.3 5475.00 45.59 270.75 N 89 15 W 0.37 4692.41 2091.1 264.3 5500.00 45.61 270.81 N 89 11 W 0.20 4709.90 2108.8 264.4 5525.00 45.76 270.85 N 89 9 W 0.64 4727.37 2126.6 264.5 5550.00 45.77 271.06 N 88 57 W 0.59 4744.81 2144.4 264.5 5575.00 45.90 271.51 N 88 29 W 1.40 4762.23 2162.2 264.6 5600.00 46.09 271.75 N 88 15 W 1.06 4779.59 2180.1 264.6 5625.00 46.41 272.64 N 87 22 W 2.84 4796.88 2198.0 264.7 5650.00 46.66 273.40 N 86 36 W 2.44 4814.08 2215.9 264.8 5675.00 46.94 274.45 N 85 33 W 3.26 4831.19 2233.9 264.8 5700.00 47.19 274.86 N 85 9 W 1.56 4848.22 2251.9 264.9 A Gyrodata Directional Survey 207.47 S 1883.76W 207.47 S 1901.77W 207.45 S 1919.73 W 207.41 S 1937.71 W 207.37 S 1955.69W 207.30 S 1973.65W 207.19 S 1991.61 W 207.01 S 2449.49W 206.79 S 2027.31 W 206.55 S 2045.15W 206.31 S 2063.03 W 206.08 S 2080.90W 205.83 S 2098.76W 205.57 S 2116.64W 205.28 S 2134.SSW 204.87 S 2152.48W 204.36 S 2170.45W 203.67 S 2188.SOW 202.71 S 2206.62W 201.46 S 2224.80W 199.98 S 2243.04W 9 • A Gyrodata Directional Survey B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH feet deg. deg. deg. min. deg./ feet feet deg. 100 ft. 5725.00 47.38 274.92 N 85 5 W 0.78 4865.18 2270.0 265.0 5750.00 47.51 274.97 N 85 2 W 0.54 4882.09 2288.2 265.1 5775.00 47.75 274.97 N 85 2 W 0.97 4898.94 2306.4 265.1 5800.00 47.97 274.98 N 85 1 W 0.90 4915.71 2324.6 265.2 5825.00 48.09 275.03 N 84 58 W 0.47 4932.43 2343.0 265.3 5850.00 48.28 275.20 N 84 48 W 0.94 4949.10 2361.3 265.4 5875.00 48.49 275.31 N 84 42 W 0.89 4965.70 2379.7 265.5 5900.00 48.71 275.84 N 84 10 W 1.83 4982.24 2398.2 265.5 5925.00 48.95 275.96 N 84 3 W 0.99 4998.69 2416.7 265.6 5950.00 49.15 276.07 N 83 56 W 0.90 5015.08 2435.3 265.7 5975.00 49.30 276.61 N 83 24 W 1.72 5031.41 2453.9 265.8 6000.00 49.57 276.79 N 83 13 W 1.21 5047.66 2472.5 265.9 6025.00 50.09 277.17 N 82 50 W 2.40 5063.79 2491.3 265.9 6050.00 50.19 276.93 N 83 4 W 0.83 5079.81 2510.1 266.0 6075.00 50.13 276.15 N 83 51 W 2.42 5095.83 2529.0 266.1 6100.00 49.92 274.74 N 85 16 W 4.40 5111.89 2547.9 266.2 6125.00 49.18 272.27 N 87 44 W 8.08 5128.11 2566.8 266.2 6150.00 48.91 270.82 N 89 11 W 4.50 5144.50 2585.6 266.3 6175.00 48.68 268.82 S 88 49 W 6.09 5160.97 2604.3 266.3 6200.00 48.13 266.44 S 86 26 W 7.48 5177.57 2623.0 266.3 6225.00 47.86 264.76 S 84 45 W 5.11 5194.30 2641.6 266.3 HORIZONTAL COORDINATES feet 198.41 S 2261.34W 196.82 S 2279.69W 195.22 S 2298.09W 193.62 S 2316.56W 192.00 S 2335.07W 190.34 S 2353.63W 188.62 S 2372.24W 186.80 S 2390.91 W 184.87 S 2409.63W 182.89 S 2428.40W 180.80 S 2447.22W 178.58 S 2466.08W 176.26 S 2485.04W 173.91 S 2504.09W 171.72 S 2523.16W 16.9.90 S 2542.23W 168.74 S 2561.22W 168.23 S 2580.09W 168.29 S 2598.90W 169.06 S 2617.57W 170.48 S 2636.1OW 10 r • A Gyrodata Directional Survey B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. deg. min. 6250.00 47.39 262.94 S 82 56 W 6275.00 47.21 262.15 S 82 9 W 6300.00 47.50 262.21 S 82 12 W 6325.00 47.72 262.23 S 82 14 W 6350.00 47.75 262.33 S 82 20 W 6375.00 47.54 262.58 S 82 35 W 6400.00 47.69 262.64 S 82 39 W 6425.00 47.94 262.71 S 82 43 W 6450.00 48.21 262.82 S 82 49 W 6475.00 48.86 263.31 S 83 19 W 6500.00 49.33 263.45 S 83 27 W 6525.00 49.77 263.59 S 83 35 W 6550.00 50.05 263.60 S 83 36 W 6575.00 50.34 263.59 S 83 35 W 6600.00 50.60 263.64 S 83 39 W 6625.00 50.72 264.43 S 84 26 W 6650.00 50.98 264.89 S 84 53 W 6675.00 51.22 265.53 S 85 32 W 6700.00 51.43 265.64 S 85 38 W 6725.00 51.63 265.71 S 85 43 W 6750.00 51.65 265.81 S 85 49 W DOGLEG VERTICAL CLOSURE HORIZONTAL SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg./ feet feet deg. feet 100 ft. 5.69 5211.15 2660.1 266.3 172.46 S 2654.46W 2.44 5228.10 2678.4 266.3 174.85 S 2672.67W 1.20 5245.04 2696.7 266.2 177.35 S 2690.89W 0.86 5261.89 2715.1 266.2 179.85 S 2709.19W 0.33 5278.71 2733.6 266.2 182.34 S 2727.52W 1.13 5295.55 2752.0 266.2 184.76 S 2745.83W 0.62 5312.40 2770.5 266.1 187.14 S 2764.15W 1.03 5329.19 2789.0 266.1 189.50 S 2782.52W .1.13 5345.90 2807.5 266.1 191.84 S 2800.97W 2.98 5362.45 2826.2 266.1 194.10 S 2819.57W 1.93 5378.82 2845.1 266.0 196.28 S 2838.34W 1.81 5395.04 2864.1 266.0 198.42 S 2857.24W 1.10 5411.14 2883.2 266.0 200.56 S 2876.24W 1.17 5427.15 2902.4 266.0 202.70 S 2895.33W 1.04 5443.06 2921.7 266.0 204.84 S 2914.49W 2.47 5458.91 2941.0 266.0 206.85 S 2933.72W 1.78 5474.69 2960.4 266.0 208.66 S 2953.02W 2.22 5490.39 2979.8 266.0 210.28 S 2972.41 W 0.89 5506.01 2999.4 266.0 211.79 S 2991.87W 0.85 5521.57 3018.9 265.9 213.26 S 3011.39W 0.33 5537.08 3038.5 265.9 214.71 S 3030.94W 11 • • B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. deg. min. DOGLEG VERTICAL CLOSURE SEVERITY DEPTH DIST. AZIMUTH deg./ feet feet deg. 100 ft. 6775.00 51.70 265.83 S 85 50 W 0.24 5552.58 3058.1 265.9 6800.00 51.64 265.81 S 85 49 W 0.27 5568.09 3077.8 265.9 6825.00 51.48 265.82 S 85 49 W 0.63 5583.63 3097.3 265.9 6850.00 51.61 265.80 S 85 48 W 0.53 5599.18 3116.9 265.9 6875.00 51.50 265.86 S 85 52 W 0.47 5614.72 3136.5 265.9 6900.00 51.42 265.98 S 85 59 W 0.50 5630.30 3156.1 265.9 6925.00 51.47 266.06 S 86 3 W 0.30 5645.88 3175.6 265.9 6950.00 51.18 266.31 S 86 18 W 1.40 5661.50 319.5.1 265.9 6975.00 51.28 266.38 S 86 23 W .0.45 5677.16 3214.6 265.9 7000.00 51.38 266.49 S 86 29 W 0.54 5692.78 3234.1 266.0 7025.00 51.22 266.60 S 86 36 W 0.70 5708.41 3253.6 266.0 '7050.00 51.25 266.64 S 86 38 W 0.16 5724.06 3273.1 266.0 7075.00 51.29 266.71 S 86 43 W 0.29 5739.70 3292.6 266.0 7100.00 51.20 266.76 S 86 46 W 0.39 5755.35 3312.1 266.0 7125.00 51.40 266.80 S 86 48 W 0.78 5770.98 3331.6 266.0 7150.00 51.41 266.89. S 86 54 W 0.30 5786.58 3351.2 266.0 7175.00 51.41 266.94 S 86 57 W 0.16 5802.17 3370.7 266.0 7200.00 51.55 267.03 S 87 2 W 0.62 5817.74 3390.3 266.0 7225.00 51.41 267.11 S 87 6 W 0.61 5833.31 3409.8 266.0 7250.00 51.36 267.14 S 87 8 W 0.23 5848.92 3429.4 266.0 7275.00 51.43 267.16 S 87 9 W 0.31 5864.51 3448.9 266.0 A Gyrodata Directional Survey HORIZONTAL COORDINATES feet 216.14 S 3050.SOW 217.57 S 3070.06W 219.00 S 3089.59W 220.43 S 3109.11 W 221..85 S 3128.64W 223.25 S 3148.15W 224.60 S 3167.65 W 225.90 S 3187.12W 227.15 S 3206.57W 228.36 S 3226.06W 229.54 S 3245.53W 230.69 S 3264.99W 231.82 S 3284.46W 232.93 S 3303.93W 234.02 S 3323.41 W 235.10 S 3342.92W 236.15 S 3362.43W 237.18 S 3381.96W 238.18 S 3401.49W 239.16 S 3421.OOW 240.13 S 3440.51 W 12 • A Gyrodata Directional Survey B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 7300.00 51.35 267.20 S 87 12 W 0.37 5880.12 3468.4 266.0 241.09 S 3460.03W 7325.00 51.38 267.26 S 87 15 W 0.21 5895.73 3487.9 266.0 242.04 S 3479.53W 7350.00 51.22 267.34 S 87 20 W 0.68 5911.36 3507.4 266.0 242.96 S 3499.02W 7375.00 51.19 267.39 S 87 24 W 0.21 5927.02 3526.9 266.0 243.85 S 3518.48W 7400.00 51.25 267.40 S 87 2.4 W 0.25 5942.68 3546.4 266.0 244.74 S 3537.95W 7425.00 50.92 267.50 S 87 30 W 1.36 5958.39 3565.9 266.1 245.60 S 3557.38W 7450.00 50.70 267.55 S 87 33 W 0.87 5974.18 3585.2 266.1 246.44 S 3576.74W 7475.00 50.83 267.60 S 87 36 W 0.53 5989.99 3604.6 266.1 247.26 S 3596.09W 7500.00 50.93 267.63 S 87 38 W 0.40 6005.77 3624.0 266.1 248.06 S 3615.47W 7525.00 50.87 267.75 S 87 45 W 0.46 6021.54 3643.4 266.1 248.85 S 3634.85W 7550.00 50.72 267.89 S 87 53 W 0.71 6037.34 3662.7 266.1 249.58 S 3654.21 W 7575.00 50.33 268.00 S 88 0' W 1.61 6053.23 3682.0 266.1 250.28 S 3673.SOW 7600.00 50.48 268.01 S 88 1 W 0.58 6069.17 3701.3 266.1 250.95 S 3692.75W 7625.00 50.61 268.01 S 88 1 W 0.54 6085.05 3720.6 266.1 251.62 S 3712.04W 7650.00 50.49 268.09 S 88 6 W 0.54 6100.94 3739.9 266.1 252.27 S 3731.33W 7675.00 50.59 268.03 S 88 2 W 0.43 6116.82 3759.1 266.1 252.93 S 3750.62W 7700.00 50.33 268.00 S 88 0 W 1.04 6132.74 3778.4 266.2 253.59 S 3769.89W 7725.00 50.37 265.99 S 85 59 W 6.19 6148.69 3797.7 266.2 254.60 S 3789.11 W 7750.00 50.16 267.97 S 87 58 W 6.15 6164.67 3816.9 266.2 255.61 S 3808.31 W 7775.00 49.91 267.95 S 87 57 W 0.99 6180.73 3836.0 266.2 256.30 S 3827.46W 13 B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. deg. min. DOGLEG VERTICAL CLOSURE HORIZONTAL SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg./ feet feet deg. feet 100 ft. 7800.00 50.07 267.95 S 87 57 W 0.64 6196.80 3855.2 266.2 256.98 S 3846.60W 7825.00 50.22 267.95 S 87 57 W 0.59 6212.82 3874.4 266.2 257.67 S 3865.78W 7850.00 50.01 267.97 S 87 58 W 0.85 6228.85 3893.5 266.2 258.35 S 3884.95W 7875.00 49.85 268.01 S 88 1 W 0.65 6244.95 3912.7 266.2 259.02 S 3904.07W 7900.00 49.83 268.01 S 88 1 W 0.08 6261.07 3931.7 266.2 259.69 S 3923.16W 7925.00 49.77. 268.07 S 88 4 W 0.32 6277.21 3950.8 266.2 260.34 S 3942.25W 7950.00 49.65 268.16 S 88 10 W 0.56 6293.37 3969.9 266.2 260.97 S 3961.31 W 7975.00 49.38 268.21 S 88 12 W 1.07 6309.61 3988.9 266.2 261.57 S 3980.31 W 8000.00 49.27 268.22 S 88 13 W 0.46 6325.90 4007.8 266.2 262.16 S 3999.26W 8025.00 49.36 268.19 S 88 11 W 0.39 6342.20 4026.8 266.3 262.75 S 4018.21 W 8050.00 49.16 268.20 S 88 12 W 0.79 6358.51 4045.7 266.3 263.35 S 4037.14W 8075.00 49.07 268.22 S 88 13 W 0.36 6374.88 4064.6 266.3 263.94 S 4056.03W 8100.00 49.04 268.26 S 88 16 W 0.18 6391.26 4083.5 266.3 264.52 S 4074.91 W 8125.00 48.83 268.24 S 88 14 W 0.86 6407.68 4102.3 266.3 265.10 S 4093.75W 8150.00 48.97 268.24 S 88 14 W 0.57 6424.12 4121.2 266.3 265.68 S 4112.58W 8175.00 48.79 268.22 S 88 13 W 0.72 6440.56 4140.0 266.3 266.26 S 4131.40W 8200.00 48.58 268.27 S 88 16 W 0.85 6457.06 4158.7 266.3 266.83 S 4150.17W 8225.00 48.61 268.30 S 88 18 W 0.14 6473.60 4177.5 266.3 267.40 S 4168.92W 8250.00 48.35 268.31 S 88 19 W 1.03 6490.17 4196.2 266.3 267.95 S 4187.62W 8275.00 48.36 268.29 S 88 17 W 0.09 6506.78 4214.9 266.3 268.50 S 4206.30W 8300.00 48.32 268.27 S 88 16 W 0.18 6523.40 4233.5 266.4 269.07 S 4224.97W 14 A Gyrodata Directional Survey B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. deg. ruin. DOGLEG VERTICAL CLOSURE HORIZONTAL SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg./ feet feet deg. feet 100 ft. 8325.00 48.07 268.39 S 88 23 W 1.04 6540.07 4252.1 266.4 269.61 S 4243.59W 8350.00 47.86 268.44 S 88 26 W 0.87 6556.81 4270.7 266.4 270.12 S 4262 15W 8375.00 47.50 268.50 S 88 30 W 1.44 6573.64 4289.2 266.4 270.62 S . 4280 63W 8400.00 47.26 268.47 S 88 28 W 0.96 6590.57 4307.6 266.4 271.10 S . 4299.02W 8425.00 47.35 268.42 S 88 25 W 0.38 6607.52 4325.9 266.4 271.60 S 4317.39W 8450.00 47.16 268.41 S 88 25 W 0.77 6624.49 4344.3 266.4 272.11 S 4335.74W 8475.00 46.93 268.41 S 88 24 W 0.90 6641.52 4362.6 266.4 272.61 S 4354.03W 8500.00 46.65 268.41 S 88 25 W 1.10 6658.64 4380.8 266.4 273.12 S 4372.25W 8525.00 46.39 268.39 S 88 24 W 1.04 6675.84 4398.9 266.4 273.63 S 4390.38W 8550.00 46.34 268.44 S 88 27 W 0.27 6693.09 4417.0 266.4 274.13 S 4408.47W 8575.00 46.29 268.50 S 88 30 W 0.24 6710.36 4435.1 266.5 274.61 S 4426.54W 8600.00 45.87 268.55 S 88 33 W 1.71 6727.70 4453.0 266.5 275.07 S 4444.54W 8625.00 45.83 268.61 S 88 37 W 0.24 6745.12 4471.0 266.5 275.52 S 4462.47W 8650.00 45.81 268.69 S 88 42 W 0.25 6762.54 4488.9 266.5 275.94 S 4480.40W 8675.00 45.50 268.80 S 88 48 W 1.26 6780.01 4506.8 266.5 276.33 S 4498.27W 8700.00 45.52 268.83 S 88 50 W 0.10 6797.53 4524.6 266.5 276.70 S 4516.1OW 8725.00 45.24 268.84 S 88 50 W 1.1 l 6815.09 4542.4 266.5 277.06 S 4533.89W 8750.00 44.99 268.84 S 88 50 W 0.99 6832.73 4560.1 266.5 277.42 S 4551.60W 8775.00 45.02 268.83 S 88 50 W 0.09 6850.41 4577.7 266.5 277.78 S 4569.28W 8800.00 44.69 268.92 S 88 55 W 1.32 6868.13 4595.3 266.5 278.13 S 4586.91 W 8825.00 44.63 268.91 S 88 55 W 0.27 6885.91 4612.9 266.5 278.46 S 4604.48W 15 A Gyrodata Directional Survey • • B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. deg. min. DOGLEG VERTICAL CLOSURE HORIZONTAL SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg./ feet feet deg. feet 100 ft. 8850.00 44.67 268.93 S 88 56 W 0.16 6903.70 4630.4 266.5 278.79 S 4622.04W 8875.00 44.32 268.90 S 88 54 W 1.40 6921.54 4647.9 266.6 279.12 S 4639.56W 8900.00 44.34 268.89 S 88 53 W 0.09 6939.42 4665.4 266.6 279.46 S 4657.03W 8925.00 44.21 268.89 S 88 53 W 0.51 6957.32 4682.8 266.6 279.80 S 4674.48W 8950.00 43.77 268.88 S 88 53 W 1.77 6975.31 4700.2 266.6 280.14 S 4691.83W 8975.00 43.80 268.85 S 88 51 W 0.15 6993.36 4717.5 266.6 280.48 S 4709.13W 9000.00 43.71 268.77 S 88 46 W 0.43 7011.41 4734.8 266.6 280.84 S 4726.41 W 9025.00 43.64 268.67 S 88 40 W 0.36 7029.50 4752.0 266.6 281.22 S 4743.67W 9050.00 43.49 268.63 S 88 38 W 0.61 7047.61 4769.2 266.6 281.63 S 4760.90W 9075.00 43.21 268.56. S 88 33 W 1.15 7065.79 4786.4 266.6 282.05 S 4778.06W 9100.00 43.20 268.51 S 88 31' W O..12 7084.01 4803.5 266.6 282.49 S 4795.17W 9125.00 43.17 268.48 S 88 29 W 0.18 7102.24 4820.6 266.6 282.94 S 4812.27W 9150.00 42.98 268.41 S 88 25 W 0.76 7120.50 4837.6 266.6 283.40 S 4829.34W 9175.00 43.00 268.32 S 88 19 W 0.25 7138.79 4854.7 266.6 283.89 S 4846.38W 9200.00 42.87 268.29 S 88 17 W 0.54 7157.09 4871.7 266.7 284.39 S 4863.40W 9225.00 42.74 268.29 S 88 17 W 0.51 7175.43 4888.7 266.7 284.90 S 4880.38W 9250.00 42.82 268.32 S 88 19 W 0.30 7193.78 4905.7 266.7 285.40 S 4897.35W 9275.00 42.44 268.32 S 88 19 W 1.51 7212.17 4922.6 266.7 285.90 S 4914.28W 9300.00 42.30 268.27 S 88 16 W 0.57 7230.64 4939.4 266.7 286.40 S 4931.12W 9325.00 42.38 268.27 S 88 16 W 0.31 7249.12 4956.3 266.7 286.91 S 4947.95W 9350.00 42.04 268.20 S 88 12 W 1.38 7267.64 4973.0 266.7 287.43 S 4964.73W 16 A Gyrodata Directional Survey A Gyrodata Directional Survey B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 9375.00 41.94 268.20 S 88 12 W 0.39 7286.22 4989.8 266.7 287.95 S 4981 45W 9400.00 41.91 268.20 S 88 12 W 0.14 7304.82 5006.5 266.7 288.48 S . 4998.15W 9425.00 41.59 268.19 S 88 11 W 1.28 7323.48 5023.1 266.7 289.00 S 5014.78W 9450.00 41.57 268.18 S 88 11 W 0.07 7342.18 5039.7 266.7 289.53 S 5031 37W 9475.00 41.34 268.14 S 88 8 W 0.95 7360.91 5056.2 266.7 290.06 S . 5047.91 W 9500.00 41.13 268.07 S 88 4 W 0.84 7379.71 5072.7 266.7 290.60 S 5064 38W 9525.00 41.29 267.97 S 87 58 W 0.66 7398.52 5089.2 266.7 291.17 S . 5080.84W 9550.00 41.16 267.95 S 87 57 W 0.51 7417.33 5105.6 266.7 291.76 S 5097.30W 9575.00 40.72 267.88 S 87 53 W 1.75 7436.21 5122.0 266.7 292.35 S 5113.67W 9600.00 40.63 267.90 S 87 54 W 0.38 7455.17 5138.3 266.7 292.95 S 5129 96W 9625.00 40.37 267.98 S 87 59 W 1.04 7474.18 5154.5 266.7 293.54 S . 5146.18W 9650.00 40.26 268.08 S 88 5 W 0.53 7493.24 5170.7 266.7 294.09 S 5162.35W 9675.00 40.16 268.20 S 88 12 W 0.51 7512.34 5186.9 266.7 294.61 S 5178.48W 9700.00 39.70 268.33 S 88 20 W 1.86 7531.51 5202.9 266.7 295.10 S 5194 52W 9725.00 39.48 268.38 S 88 23 W 0.88 7550.77 5218.8 266.8 295.56 S . 5210.44W 9750.00 39.09 268.43 S 88 26 W 1.57 7570.12 5234.6 2.66.8 296.00 S 5226 27W 9775.00 38.76 268.54 S 88 32 W 1.34 7589.57 5250.3 266.8 296.41 S . 5241.97W 9800.00 38.83 268.61 S 88 36 W 0.32 7609.06 5266.0 266.8 296.81 S 5257.63W 9825.00 38.56 268.50 S 88 30 W 1.12 7628.57 5281.6 266.8 297.20 S 5273.25W 9850.00 38.37 268.61 S 88 37 W 0.82 7648.14 5297.2 266.8 297.59 S 5288.80W 9875.00 38.42 268.62 S 88 37 W 0.24 7667.74 5312.7 266.8 297.97 S 5304.32W 17 • ., A Gyrodata Directional Survey B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 9900.00 38.12 268.68 S 88 41 W 1.24 7687.37 5328.2 266.8 298.33 S 5319.80W 9925.00 38.10 268.70 S 88 42 W 0.09 7707.04 5343.6 266.8 298.68 S 5335.22W 9950.00 38.07 268.74 S 88 44 W 0.13 7726.71 5359.0 266.8 299.03 S 5350.64W 9975.00 37.80 269.12 S 89 7 W 1.45 7746.43 5374.3 266.8 299.32 S 5366.01 W 10000.00 37.75 269.37 S 89 22 W 0.64 7766.19 5389.6 266.8 299.52 S 5381.32W 10025.00 37.59 269.53 S 89 32 W .0.76 7785.98 5404.9 266.8 299.66 S 5396.60W 10050.00 37.65 269.83 S 89 50 W 0.78 7805.78 5420.2 266.8 299.75 S 5411.86W 10075.00 37.93 270.05 N 89 57 W 1.22 7825.54 5435.4 266.8 299.76 S 5427.18W 10100.00 37.82 270.39 N 89 36 W 0.94 7845.27 5450.8 266.8 299.70 S 5442.53W 10125.00 37.86 270.58 N 89 26 W 0.47 7865.02 5466.1 266.9 299.57 S 5457.86W 10150.00 38.01 270.74 N 89 16 W 0.74 7884.73 5481.4 266.9 299.40 S 5473.23W 10175.00 37.87 271.23 N 88 46 W 1.34 7904.45 5496.7 266.9 299.13 S 5488.60W 10200.00 38.01 271.44 N 88 34 W 0.74 7924.16 5512.1 266.9 298.78 S 5503.97W 10225.00 38.14 271.70 N 88 18 W 0.83 7943.84 5527.4 266.9 298.35 S 5519.38W 10250.00 38.56 271.93 N 88 4 W 1.77 7963.45 5542.9 266.9 297.86 S 5534.88W 10275.00 38.67 272.05 N 87 57 W 0.55 7982.99 5558.4 266.9 297.32 S 5550.47W 10300.00 38.50 272.18 N 87 49 W 0.76 8002.53 5574.0 266.9 296.74 S 5566.06W 10325.00 39.35 272.14 N 87 51 W 3.43 8021.98 5589.6 267.0 296.15 S 5581.75W 10350.00 39.89 272.16 N 87 51 W 2.16 8041.23 5605.5 267.0 295.55 S 5597.68W 10375.00 39.78 272.22 N 87 47 W 0.49 8060.43 5621.4 267.0 294.94 S 5613.69W 10400.00 40.48 271.82 N 88 11 W 2.97 8079.54 5637.5 267.0 294.38 S 5629.79W 18 • • A Gyrodata Directional Survey B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. • 10425.00 40.78 271.64 N 88 22 W 1.32 8098.52 5653.7 267.0 293.88 S 5646.06W 10450.00 41.26 271.48 N 88 31 W 1.98 8117.38 5670.1 267.0 293.44 S 5662.46W 10475.00 42.06 271.25 N 88 45 W 3.25 8136.06 5686.6 267.0 293.04 S 5679.08W 10500.00 42.28 271.04 N 88 57 W 1.02 8154.59 5703.4 267.1 292.71 S 5695.86W 10525.00 42.42 270.85 N 89 9 W 0.77 8173.06 5720.2 267.1 292.43 S 5712.70W 10550.00 42.48 270.99 N 89 0 W 0.44 8191.51 5737.0 267.1 292.16 S 5729.57W 10575.00 42.33 270.98 N 89 1 W 0.59 8209.97 5753.8 267.1 291.87 S 5746.43W 10600.00 42.47 271.55 N 88 27 W 1.63 8228.43 5770.6 267.1 291.50 S 5763.28W 10625.00 42.58 271.22 N 88 47 W 1.00 8246.85 5787.5 267.1 291.09 S 5780.17W 10650.00 42.44 271.59 N 88 25 W 1.14 8265.28 5804.3 267.1 290.68 S 5797.06W 10675.00 42.10 272.42 N 87 35 W 2.64 8283.78 5821.1 267.1 290.09 S 5813.87W • 10700.00 42.05 272.13 N 87 52 W 0.83 8302.34 5837.8 267.2 289.43 S 5830.61W 10725.00 42.03 272.29 N 87 43 W 0.44 8320.90 5854.5 267.2 288.78 S 5847.33W 10750.00 41.51 272.90 N 87 6 W 2.64 8339.55 5871.0 267.2 288.03 S 5863.97W 10775.00 41.41 273.16 N 86 50 W 0.80 8358.28 5887.5 267.2 287.15 S 5880.SOW 10800.00 41.42 273.24 N 86 45 W 0.23 8377.03 5904.0 267.2 286.23 S 5897.01 W 10825.00 41.70 273.64 N 86 21 W 1.54 8395.74 5920.4 267.2 285.23 S 5913.56W 10850.00 41.03 273.92 N 86 5 W 2.78 8414.51 5936.9 267.3 284.14 S 5930.OSW 10875.00 41.24 274.95 N 85 3 W 2.84 8433.33 5953.2 267.3 282.87 S 5946.45W 10900.00 40.94 276.41 N 83 35 W 4.02 8452.18 5969.4 267.3 281.24 S 5962.80W 19 A Gyrodata Directional Survey B.P. Exploration Lease: E-Pad Well: E-l0A Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK0108G 101 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. deg. min. DOGLEG VERTICAL CLOSURE HORIZONTAL SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg./ feet feet deg. feet 100 ft. 10925.00 40.96 277.05 N 82 57 W 1.67 8471.06 10950.00 40.86 276.08 N 83 55 W 2.56 8489.95 10975.00 40.51 275.71 N 84 18 W 1.73 8508.91 11000.00 39.91 275.73 N 84 16 W 2.38 8528.00 Final Station Closure: Distance: 6033.84 ft Az: 267.40 deg. 5985.6 267.3 279.32 S 5979.07W 6001.7 267.4 277.45 S 5995.33W 6017.9 267.4 275.78 S 6011.54W 6033.8 267.4 274.17 S 6027.60W • 20 Survey QC - RGS-CT Specification Sheet ~~ SURVEY QUALITY CONTROL -SPECIFICATION DATA TNTTT~i TCATTf1N Gyro Compass Reading j Station Raw Inclination Raw Azimuth Abs (ERMeas ERrneo) 12 13.64 259.29 0.0503 13 13.64 259.38 0.0430 14 13.64 259.23 0.0034 15 13.64 259.24 0.0117 16 13.64 259.39 0.0448 17 13.64 259.36 0.0279 18 13.64 259.09 0.0017 Average 13.64 259.28 0.0261 Tolerance on Average* 0.0824 Standard Deviation 0.00 0.11 0.0190 Tolerance on St. Dev.** 0.1° 0.2° 0.0371 Advanced Initialisation Azimuth Advanced Initialisation Standard Deviation Tolerance = TBA * Tolerance on Average of earth horizontal rate difference is given by (1/Cosh * v[(CosA*Sinl*0.1)~+t1?_n>;z~o/hr ** Tolerance on Standard Deviation of earth horizontal rate difference tolerance is given by (1/Cosh *J[(CosA*SinI*0.1)Z+(O.OSZ/(n-i))) ~/hr DRIFT TUNFS Drift Tune Number Ending Time Ending Depth Ending Inclination Ending Azimuth Residual Gx Bias Residual Gy Bias Start End Start End 1 1791.80 4999.74 45.46. 267.93 0.000 0.000 0.000 -0.001 2 1397.39 7626.02 50.29 268.57 -0.001 0.001 -0.008 0.009 3 1564.08 9799.93 38.24 269.40 -0.000 0.000 0.000 0.000 4 1078.51 10939.60 40.01 276.48 -0.003 0.004 -0.000 0.000 5 425.97 10887.34 40.08 275.70 -0.000 0.000 0.000 -0.000 6 1063.32 9800.03 38.14 268.66 0.003 -0.003 0.002 -0.002 7 1457.82 7624.86 50.40 267.94 0.000 -0.000 0.000 -0.000 8 1594.39 4999.95 45.40 268.44 0.008 -0.007 -0.006 0.005 9 1958.44- 2200.19 14.30 259.26 0.000 -0.001 0.000 0.003 Average 0.001 -0.001 -0.001 0.002 Standard Deviation 0.003 0.003 0.003 0.003 Tolerance for both the Average and the Standard Deviation 0.033°/hr 0.033°/hr 0.033°/hr 0.033°/hr _INATION AND AZIMUTH INRUN AND OUTRUN COMPARISON Depth Corrected Inclination Corrected Azimuth Inrun * Outrun * Difference Inrun * Outrun * Difference 100.00 0.18 0.21 -0.03 302.85 239.32 63.53 200.00 0.36 0.40 -0.05 245.69 193.64 52.05 300.00 0.52 0.46 0.06 195.46 197.89 -2.43 400.00 0.60 0.55 0.05 201.93 204.04 -2.11 500.00 0.68 0.82 -0.15 208.15 210.44 -2.29 SURV-Q167 (OPS SUR-MA-003) 19~^ Nov 03 /Rev 15 Page 1 of 10 AK0108G_301 Survey QC - RGS-CT Specification Sheet ~...~. 600.00 0.72 0.83 -0.10 212.30 213.93 -1.63 700.00 0.75 0.80 -0.04 216.31 220.77 -4.47 800.00 0.61 0.63 -0.02 219.15 215.17 3.97 900.00 0.47 0.30 0.17 218.50 208.61 9.89 1000.00 0.30 0.20 0.10 189.29 194.27 -4.98 1100.00 0.16 0.11 0.05 159.18 168.32 -9.15 1200.00 0.16 0.14 0.02 121.69 119.02 2.66 1300.00 0.16 0.19 -0.02 86.38 101.54 -15.17 1400.00 0.18 0.20 -0.02 68.96 84.56 -15.60 1500.00 0.25 0.20 0.04 46.28 59.21 -12.93 1600.00 0.70 0.73 -0.03 340.31 296.35 43.95 1700.00 1.22 1.49 -0.26 280.63 275.63 5.01 1800.00 2.25 2.05 0.19 272.60 270.43 2.17 1900.00 3.46 3.14 0.32 265.18 264.91 0.27 2000.00 6.20 6.48 -0.28 262.69 255.81 6.88 2100.00 8.91 8.66 0.25 260.38 257.81 2.56 2200.00 11.41 11.00 0.41 259.44 255.63 3.81 2225.00 12.04 11.68 0.36 259.20 256.03 3.17 2250.00 12.66 12.40 0.26 258.97 257.00 1.97 2275.00 13.29 13.12 0.17 258.73 257.97 0.76 2300.00 13.87 13.84 0.03 258.64 258.94 -0.30 2325.00 14.83 14.78 0.04 258.68 259.62 -0.94 2350.00 15.43 15.48 -0.04 258.80 259.44 -0.63 2375.00 16.30 16.25 0.04 258.90 259.25 -0.35 2400.00 17.28 17.16 0.12 259.08 259.78 -0.70 2425.00 17.68 17.65 0.03 259.04 259.64 -0.60 2450.00 18.57 18.50 0.07 258.97 259.39 -0.42 2475.00 19.41 19.23 0.17 258.94 259.41 -0.47 2500.00 19.94 19.80 0.14 258.97 259.62 -0.64 2525.00 20.87 20.65 0.22 259.02 259.50 -0.48 2550.00 21.56 21.36 0.20 259.00 259.53 -0.53 2575.00 22.39 22.18 0.21 258.93 259.53 -0.60 2600.00 23.50 23.34 0.15 258.80 259.56 -0.76 2625.00 24.00 23.88 0.12 258.79 259.22 -0.43 2650.00 24.71 24.55 0.16 258.79 259.20 -0.42 2675.00 25.57 25.36 0.21 258.79 259.37 -0.58 2700.00- 25.94 25.73 0.21 258.79 259.36 -0.57 2725.00 26.56 26.37 0.19 .258.93 259.24 -0.31 2750.00 27.76 27.61 0.15 259.30 259.85 -0.55 2775.00 28.83 28.68 0.14 259.74 260.25 -0.52 2800.00 30.74 30.66 0.08 260.60 260.99 -0.39 2825.00 31.67 31.52 0.15 261.84 262.08 -0.25 2850.00 32.51 32.33 0.18 263.12 263.34 -0.22 2875.00 32.92 32.74 0.18 263.63 264.00 -0.38 2900.00 33.13 33.04 0.09 263.82 264.11 -0.29 SURV-Q 167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 2 of 10 AKOlOBG 101 Survey QC - RGS-CT Specification Sheet ~'/ LJ15.UU 33.40 33.27 0.13 264.01 264.06 -0 05 2950.00 33.80 33.65 0.15 263.98 264.12 . -0 14 2975.00 34.05 33.95 0.11 263.89 264.14 . -0 24 3000.00 34.71 34.59 0.12 263.54 263.58 . -0 04 3025.00 35.01 34.90 0.11 263.61 263.66 . -0.05 3050.00 35.27 35.15 0.12 263.67 263.72 -0.05 3075.00 35.49 35.35 0.15 263.76 263.83 -0 07 3100.00 35.80 35.66 0.14 263.92 264.05 . -0 13 3125.00 36.21 36.10 0.11 264.11 264.29 . -0.17 3150.00 36.21 36.16 0.05 263.39 263.59 -0.21 3175.00 37.74 37.59 0.16 263.46 263.63 -0.17 3200.00 37.93 37.78. 0.16 263.41 263.60 -0 19 3225.00 38.47 38.32 0.14 263.20 263.37 . -0.18 3250.00 38.88 38.75 0.14 263.11 263.29 -0.18 3275.00 39.28 39.15 0.13 263.03 263.22 -0.19 3300.00 40.03 39.91 0.12 263.14 263.30 -0.16 3325.00 40.85 40.72 0.12 263.55 263.69 -0.14 3350.00 41.81 41.69 0.12 263.96 264.08 -0.11 3375.00 42.98 42.89 0.09 264.61 264.75 -0.14 3400.00 43.39 43.37 0.03 264.86 264.96 -0.10 3425.00 43.95 43.86 0.10 265.32 265.32 0.00 3450.00 44.13 44.02 0.11 266.27 266.28 -0.01 3475.00 44.31 44.21 0.10 267.28 267.28 0.00 3500.00 44.48 44.38 0.09 267.35 267.32 0.03 3525.00 44.71 44.61 0.10 266.51 266.45 0.06 3550.00 44.98 44.91 0.07 264.47 264.40 .0.07 3575.00 45.28 45.21 0.07 262.98 262.90 0.08 3600.00 45.61 45.55 0.06 262.42 262.34 0.08 3625.00 46.00 45.94 0.06 261.82 261.75 0.08 3650.00 46.22 46.16 0.07 261.66 261.60 0.06 3675.00 46.42 46.36 0.06 261.64 261.58 0.07 3700.00 46.57 46.51 0.06 261.59 261.52 0.07 3725.00 46.44 46.40 0.04 261.45 261.39 0.07 3750.00 46.51 46.47 0.04 261.42 261.32 0.10 3775.00 46.59 46.55 0.04 261.39 261.30 0.09 3800.00 46.30 46.26 0.04 261.29 261.20 0.09 3825..00 46.28 46.26 0.02 261.24 261.15 0.09 3850.00 46.05 46.03 0.02 261.20 261.07 0.13 3875.00 45.88 45.85 0.02 261.10 260.98 0.13 3900.00 46.00 45.99 0.02 261.11 260.97 0.14 3925.00 45.70 45.67 0.02 261.14 261.01 0.13 3950.00 45.77 45.76 0.02 261.20 261.08 0.12 3975.00 45.50 45.49 0.01 261.56 261.44 0.12 4000.00 45.54 45.52 0.02 261.88 261.77 0.12 4025.00 45.64 45.62 0.01 262.11 261.98 0.13 SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 3 of 10 AK0108G 101 Survey QC - RGS-CT Specification Sheet ~- 4u5u.UU 45.63 45.61 0.02 262.37 262.27 0.11 4075.00 45.67 45.65 0.02 262.50 262.40 0.10 4100.00 45.67 45.66 0.01 262.60 262.51 0.10 4125.00 45.60 45.59 0.01 262.64 262.54 0.10 4150.00 45.71 45.71 0.01 262.64 262.52 0.12 4175.00 45.65 45.65 -0.01 262.72 262.60 0.12 4200.00 45.77 45.78 -0.01 262.76 262.63 0.13 4225.00 45.84 45.85 -0.01 262.88 262.75 0.13 4250.00 45.86 45.87 -0.01 263.23 263.09 0.13 4275.00 45.70 45.70 -0.01 263.83 263.71 0.13 4300.00 45.74 45.74 -0.00 264.13 264.00 0.13 4325.00 45.69 45.70 -0.02 265.01 264.86 0.15 4350.00 45.76 45.78 -0.02 265.35 265.21 0.14 4375.00 45.78 45.79 -0.02 265.76 265.67 0.09 4400.00 45.76 45.78 -0.01 266.13 266.06 0.07 4425.00 45.81 45.83 -0.02 266.26 266.19 0.07 4450.00 45.84 45.91 -0.07 266.45 266.35 0.10 4475.00 45.72 45.74 -0.03 266.67 266.47 0.20 4500.00 45.86 45.89 -0.03 266.76 266.55 0.21 4525.00 45.88 45.93 -0.05 266.88 266.67 0.22 4550.00 45.86 45.91 -0.05 266.96 266.74 0.22 4575.00 45.92 45.97 -0.04 266.97 266.74 0.23 4600.00 45.75 45.81 -0.07 266.93 266.70 0.23 4625.00 45.58 45.64 -0.07 266.86 266.61 0.25 4650.00 45.23 45.27 -0.04 266.68 266.44 0.24 4675.00 45.40 45.41 -0.01 266.64 266.48 0.16 4700.00 45.54 45.55 -0.01 266.62 266.47 0.14 4725.00 45.38 45.38 0.00 266.61 266.51 0.10 4750.00 45.27 45.28 -0.00 266.76 266.72 0.04 4775.00 45.40 45.46 -0.06 266.89 266.90 -0.02 4800.00 45.37 45.46 -0.09 267.41 267.40 0.01 4825.00 45.47 45.53 -0.06 267.63 267.49 0.14 4850.00 45.62 45.67 -0.05 267.72 267.57 0.14 4875.00 45.34 45.40 -0.06 267.81 267.67 0.14 4900.00 45.15 45.19 -0.03 267.74 267,67 0.08 4925.00 45.14 45.31 -0.17 267.69 .267.66 0.03 4950.00 44.91 45.04 -0.13 267.58 267.43 0.15 4975.00 45.07 45.21 -0.14 267.73 267.53 0.20 5000.00 45.18 45.23 -0.05 267.59 267.35 0.24 5025.00 45.01 45.05 -0.03 267.61 267.43 0.18 5050.00 45.12 45.16 -0.04 267.61 267.44 0.17 5075.00 45.21 45.25 -0.04 267.82 267.65 0.17 5100.00 45.46 45.47 -0.01 268.45 268.19 0,25 5125.00 45.66 45.63 0.03 269.20 268.97 0.23 5150.00 45.88 45.86 0.03 270.14 269.94 0.20 SURV-Q767 (OPS SUR-MA-003) 19`" Nov 03 /Rev 35 Page 4 of 10 AK0108G 101 Survey QC - RGS-CT Specification Sheet ~ -- 5175.00 46.08 46.10 -0.02 270.17 269.85 0.32 5200.00 46.23 46.22 0.00 270.18 269.92 0.26 5225.00 46.00 45.97 0.03 270.29 270.05 0.23 5250.00 45.91 45.89 0.03 270.35 270.10 0.25 5275.00 46.12 46.09 0.03 270.37 270.12 0.26 5300.00 45.89 45.89 0.00 270.44 270.19 0.25 5325.00 46.01 45.96 0.05 270.47 270.22 0.24 5350.00 45.88 45.85 0.03 270.72 270.46 0.26 5375.00 45.49 45.48 0.01 270.98 270.70 0.28 5400.00 45.52 45.47 0.05 271.01 270.74 0.27 5425.00 45.66 45.61 0.06 271.04 270.77 0.27 5450.00 45.72 45.68 0.04 271.02 270.77 0.26 5475.00 45.65 45.59 0.06 270.99 270.75 0.24 5500.00 45.67 45.61 0.06 271.01 270.81 0.20 5525.00 45.82 45.76 0.06 271.05 270.85 0.20 5550.00 45.79 45.77 0.03 271.23 271.06 0.17 5575.00 45.92 45.90 0.03 271.68 271.51 0.17 5600.00 46.13 46.09 0.03 271.95 271.75 0.19 5625.00 46.43 46.41 0.03 273.01 272.64 0.37 5650.00 46.73 46.66 0.07 273.69 273.40 0.29 5675.00 47.02 46.94 0.08 274.66 274.45 0.21 5700.00 47.27 47.19 0.08 275.08 274.86 0.23 5725.00 47.46 47.38 0.08 275.13 274.92 0.21 5750.00 47.60 47.51 0.09 275.18 274.97 0.21 5775.00 47.80 47.75 0.05 275.16 274.97 0.19 5800.00 48.04 47.97 0.06 275.32 274.98 0.35 5825.00 48.19 48.09 0.11 275.34 275.03 0.31 5850.00 48.39 48.28 0.11 275.48 275.20 0.27 5875.00 48.58 48.49 0.09 275.53 275.31 0.22 5900.00 48.76 48.71 0.04 276.21 275.84 0.38 5925.00 49.01 48.95 0.07 276.29 275.96 0.34 5950.00 49.28 49.15 0.13 276.37 276.07 0.30 5975.00 49.42 49.30 0.12 276.92 276.61 0.31 6000.00 49.69 49.57 0.12 277.10 276.79 0.32 6025.00 50.21 50.09 0.12 277.58 277.17 0.40 6050.00 50.33 50.19 0.14 277.25 276.93 0.32 6075.00 50.23 50.13 0.10 276.41 276.15 0.26 6100.00 49.99 49.92 0.06 275.15 274.74 0.41 6125.00 49.24 49.18 0.06 272.61 272.27 0.34 6150.00 49.00 48.91 0.10 271.20 270.82 0.38 6175.00 48.83 48.68 0.14 269.18 268.82 0.35 6200.00 48.27 48.13 0.14 266.82 266.44 0.38 6225.00 48.02 47.86 0.15 265.19 264.76 0.43 6250.00 47.54 47.39 0.15 263.38 262.94 0.44 6275.00 47.37 47.21 0.16 262.57 262.15 0.42 SURV-Q367 (OPS SUR-MA-003) 19 `" Nov 03 /Rev 15 Page 5 of 10 AK0108G-101 Survey QC - RGS-CT Specification Sheet r 6300.00 47.63 47.50 0.13 262.55 262.21 0.35 6325.00 47.83 47.72 0.12 262.61 262.23 0.38 6350.00 47.86 47.75 0.11 262.69 262.33 0.36 6375.00 47.65 47.54 0.11 262.97 262.58 0.39 6400.00 47.81 47.69 0.13 263.02 262.64 0.38 6425.00 48.05 47.94 0.12 263.10 262.71 0.39 6450.00 48.35 48.21 0.14 263.19 262.82 0.37 6475.00 49.00 48.86 0.14 263.67 263.31 0.36 6500.00 49.46 49.33 0.13 263.78 263.45 0.33 6525.00 49.92 49.77 0.15 263.93 263.59 0.35 6550.00 50.20 50.05 0.15 263.93 263.60 0.33 6575.00 50.49 50.34 0.15 263.92 263.59 0.32 6600.00 50.75 50.60 0.15 263.99 263.64 0.34 6625.00 50.86 50.72 0.15 264.74 264.43 0.32 6650.00 51.13 50.98 0.15 265.21 264.89 0.32 6675.00 51.38 51.22 0.15 265.83 265.53 0.30 6700.00 51.58 51.43 0.15 265.94 265.64 0.30 6725.00 51.74 51.63 0.11 266.00 265.71 0.29 6750.00 51.77 51.65 0.13 266.24 265.81 0.42 6775.00 51.86 51.70 0.16 266.20 265.83 0.37 6800.00 51.80 51.64 0.16 266.18 265.81 0.37 6825.00 51.63 51.48 0.16 266.19 265.82 0.38 6850.00 51.78 51.61 0.17 266.16 265.80 0.36 6875.00 51.68 51.50 0.17 266.22 265.86 0.36 6900.00. 51.61 51.42 0.19 266.35 265.98 0.36 6925.00 51.58 51.47 0.11 266.37 266.06 0.31 6950.00 51.32 51.18 0.14 266.74 266.31 0.43 6975.00 51.46 51.28 0.18 266.72 266.38 0.34 7000.00 51.43 51.38 0.06 266.87 266.49 0.38 7025.00 51.39 51.22 0.16 266.98 266.60 0.38 7050.00 51:44 51.25 0.19 267.02 266.64 0.38 7075.00 51.47 51.29 0.18 267.10 266.71 0.39 7100.00 51.37 51.20 0.16 267.14 266.76 0.38 7125.00 51.57 51.40 0.17 267.19 266.80 0.40 7150.00 51.55 51.41 0.14 267.23 266.89 0.34 7175.00 51.52 51.41 0.11 267.29 266.94 0.34 7200.00 51.65 51.55 0.10 267.51 267.03 0.48 7225.00 51.58 51.41 0.16 267.56 267.11 0.45 7250.00 51.55 51.36 0.20 267.54 267.14 0.41 7275.00 51.61 51.43 0.18 267.57 267.16 0.41 7300.00 51.53 51.35 0.18 267.61 267.20 0.41 7325.00 51.57 51.38 0.19 267.61 267.26 0.36 7350.00 51.34 51.22 0.12 267.69 267.34 0.36 7375.00 51.34 51.19 0.16 267.86 267.39 0.47 7400.00 51.44 51.25 0.19 267.88 267.40 0.48 SURV-Q167 (OPS SUR-MA-003) 19M Nov 03 /Rev 15 Page 6 of 10 AK0308G 101 Survey QC - RGS-CT Specification Sheet y ,~~ 7425.00 51.06 50.92 0.14 268.00 267.50 0.49 7450.00 50.85 50.70 0.14 268.05 267.55 0.50 7475.00 51.01 50.83 0.18 268.04 267.60 0.45 7500.00 51.12 50.93 0.19 268.06 267.63 0.43 7525.00 51.05 50.87 0.18 268.18 267.75 0.43 7550.00 50.92 50.72 0.20 268.33 267.89 0.44 7575.00 50.52 50.33 0.19 268.44 268.00 0.44 7600.00 50.67 50.48 0.19 268.47 268.01 0.46 7625.00 50.81 50.61 0.20 268.47 268.01 0.46 7650.00 50.69 50.49 0.19 268.50 268.09 0.41 7675.00 50.80 50.59 0.21 268.45 268.03 0.41 7700.00 50.47 50.33 0.13 268.40 268.00 0.40 7725.00 50.47 50.37 0.10 268.53 265.99 2.54 7750.00 50.35 50.16 0.19 268.49 267.97 0.52 7775.00 50.08 49.91 0.16 268.44 267.95 0.49 7800.00 50.13 50.07 0.06 268.49 267.95 0.54 7825.00 50.37 50.22 0.15 268.51 267.95 0.56 7850.00 50.16 50.01 0.15 268.56 267.97 0.58 7875.00 50.01 49.85 0.16 268.60 268.01 0.59 7900.00 49.95 49.83 0.12 268.60 268.01 0.60 7925.00 49.93 49.77 0.16 268.65 268.07 0.57 7950.00 49.80 49.65 0.16 268.75 268.16 0.58 7975.00 49.52 49.38 0.14 268.80 268.21 0.59 8000.00 49.43 49.27 0.16 268.81 268.22 0.60 8025.00 49.50 49.36 0.14 268.78 268.19 0.59 8050.00 49.29 49.16 0.13 268.81 268.20 0.61 8075.00 49.24 49.07 0.16 268.84 268.22 0.62 8100.00 49.17 49.04 0.13 268.87 268.26 0.61 8125.00 48.98 48.83 0.15 268.85 268.24 0.61 8150.00 49.12 48.97 0.15 268.85 268.24 0.61 8175.00 48.93 48.79 0.14 268.82 268.22 0.60 8200.00 48.74 48.58 0.16 268.86 268.27 0.59 8225:00 48.76 48.61 0.16 268.88 268.30 0.59 8250.00 48.49 48.35 0.14 268.90 268.31 0.59 8275.00 48.53 48.36 0.17 268.85 268.29 0.56 8300.00 48.35 48.32 0..04 268.84 268.27 0.57 8325.00 48.21 48.07 0.13 269.02 268.39 0.63 8350.00 47.96 47.86 0.10 268.96 268.44 0.52 8375.00 47.60 47.50 0.10 269.16 268.50 0.66 8400.00 47.41 47.26 0.15 269.07 268.47 0.60 8425.00 47.51 47.35 0.16 269.03 268.42 0.61 8450.00 47.30. 47.16 0.14 268.97 268.41 0.56 8475.00 47.02 46.93 0.09 269.11 268.41 0.70 8500.00 46.80 46.65 0.15 269.01 268.41 0.60 8525.00 46.55 46.39 0.15 269.01 268.39 0.62 SURV-Q 167 (OPS SU R-MA-003) 19`" Nov 03 /Rev 15 Page 7 of 30 AK0108G 101 Survey QC - RGS-CT Specification Sheet ..~.~ 8550.00 46.48 46.34 0.15 269.01 268.44 0.57 8575.00 46.42 46.29 0.13 269.06 268.50 0.56 8600.00 45.95 45.87 0.08 269.10 268.55 0.55 8625.00 45.95 45.83 0.12 269.30 268.61 0.69 8650.00 45.89 45.81 0.09 269.24 268.69 0.55 8675.00 45.62 45.50 0.12 269.48 268.80 0.68 8700.00 45.61 45.52 0.09 269.37 268.83 0.55 8725.00 45.38 45.24 0.13 269.49 268.84 0.65 8750.00 45.03 44.99 0.04 269.50 268.84 0.66 8775.00 45.13 45.02 0.12 269.39 268.83 0.56 8800.00 44.82 44.69 0.13 269.59 268.92 0.67 8825.00 44.70 44.63 0.08 269.64 268.91 0.73 8850.00 44.74 44.67 0.07 269.48 268.93 0.55 8875.00 44.45 44.32 0.13 269.47 268.90 0.57 8900.00 44.47 44.34 0.14 269.57 268.89 0.68 8925.00 44.31 44.21 0.10 269.60 268.89 0.71 8950.00 43.84 43.77 0.07 269.61 268.88 0.73 8975.00 43.83 43.80 0.03 269.52 268.85 0.67 9000.00 43.74 43.71 0.04 269.36 268.77 0.59 9025.00 43.71 43.64 0.07 269.23 268.67 0.55 9050.00 43.59 43.49 0.09 269.18 268.63 0.56 9075.00 43.35 43.21 0.14 269.13 268.56 0.57 9100.00 43.35 43.20 0.15 269.10 268.51 0.59 9125.00 43.30 43.17 0.14 269.14 268.48 0.66 9150.00 43.10 42.98 0.12 269.11 268.41 0.70 9175.00 43.12 43.00 0.12 269.04 268.32 0.72 9200.00 42.96 42.87 0.09 269.01 268.29 0.72 9225.00 42.84 42.74 0.09 269.03 268.29 0.74 9250.00 42.89 42.82 0.08 269.06 268.32 0.74 9275.00 42.47 42.44 0.04 269.04 268.32 0.72 9300.00 42.33 42.30 0.03 268.98 268.27 0.71 9325.00 42.41 42.38 0.03 268.97 268.27 0.70 9350.00 42.07 42.04 0.04 268.90 268.20 0.70 9375.00 41.99 41.94 0.05 268.89 268.20 0.69 9400.00 41.93 41.91 0.03 268.90 268.20 0.70 9425.00 41.61 41.59 0.02 268.89 .268.19 0.70 9450.00 41.61 41.57 0.04 268.85 268.18 0.67 9475.00 41.35 41.34 0.01 268.78 268.14 0.64 9500.00 41.15 41.13 0.02 268.74 268.07 0.66 9525.00 41.30 41.29 0.01 268.65 267.97 0.68 9550.00 41.17 41.16 0.02 268.67 267.95 0.72 9575.00 40.79 40.72 0.07 268.61 267.88 0.73 9600.00 40.71 40.63 0.08 268.63 267.90 0.73 9625.00 40.47 40.37 0.10 268.70 267.98 0.72 9650.00 40.40 40.26 0.14 268.77 268.08 0.69 SURV-Q167 (OPS SUR-MA-003) 19`" NOV 03 /Rev IS Page 8 of 10 AKOlOBG 101 Survey QC - RGS-CT Specification Sheet ~~ yb/S.VU 40.29 40.16 0.14 268.82 268.20 0 62 9700.00 39.82 39.70 0.12 268.89 268.33 . 0 56 9725.00 39.58 39.48 0.10 268.92 268.38 . 54 0 9750.00 39.14 39.09 0.05 269.01 268.43 . 0 58 9775.00 38.81 38.76 0.04 269.17 268.54 . 0.64 9800.00 38.89 38.83 0.06 269.31 268.61 0.70 9825.00 38.63 38.56 0.07 269.23 268.50 73 0 9850.00 38.49 38.37 0.13 269.31 268.61 . 0.70 9875.00 38.55 38.42 0.13 269.26 268.62 0 64 9900.00 38.22 38.12 0.11 269.24 268.68 . 0.55 9925.00 38.13 38.10 0.04 269.26 268.70 0 56 9950.00 38.08 38.07 0.00 269.39 268.74 . 0.65 9975.00 37.84 37.80 0.05 269.86 269.12 0.74 10000.00 37.83 37.75 0.08 270.07 269.37 0.70 10025.00 37.71 37.59 0.12 270.11 269.53 0.58 10050.00 37.71 37.65 0.05 270.36 269.83 0.53 10075.00 37.92 37.93 -0.01 270.68 270.05 0.63 10100.00 37.85 37.82 0.03 271.14 270.39 0 74 10125.00 37.95 37.86 0.10 271.25 270.58 . 0.68 10150.00 38.08 38.01 0.06 271.28 270.74 0.54 10175.00 37.86 37.87 -0.02 271.86 271.23 0 63 10200.00 38.05 38.01 0.04 272.16 271.44 . 0.72 10225.00 38.24 38.14 0.11 272.30 271.70 0 60 10250.00 38.57 38.56 0.02 272.47 271.93 . 0 53 10275.00 38.70 38.67 0.03 272.67 272.05 . 0.62 10300.00 38.50 38.50 -0.00 272.80 272,18 0.63 10325.00 39.29 39.35 -0.06 272.82 272.14 0.68 10350.00 39.90 39.89 0.01 272.90 272.16 0.74 10375.00 39.83 39.78 0.05 272.91 272.22 0.70 10400.00 40.56 40.48 0.08 272.44 271.82 0.62 10425.00 40.80 40.78 0.02 272.20 271.64 0.56 10450.00 41.22 41.26 -0.05 272.14 271.48 0.66 10475.00 42.09 42.06 0.03 271.97 271.25 0.73 10500.00 42.38 42.28 0.10 271.73 271.04 0.69 10525.00 42.49 42.42 0.07 271.47 270.85 0.62 10550.00 42.48 42.48 -0.00 271.73 270.99 0.74 10575.00 42.34 42.33 0.00 271.75 270.98 0.77 10600.00 42.49 42.47 0,02 272.27 271.55 0.72 10625.00 42.61 42.58 0.03 271.94 271.22 0.73 10650.00 42.46 42.44 0.01 272.31 271.59 0.72 10675.00 42.16 42.10 0.06 273.09 272.42 0.67 10700.00 42.10 42.05 0.06 272.74 272.13 0.61 10725.00 42.07 42.03 0.04 272.97 272.29 0.68 10750.00 41.51 41.51 0.00 273.64 272.90 0.74 10775.00 41.46 41.41 0.05 273.82 273.16 0.66 SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 1S Page 9 of 10 AK0108G 101 Survey QC - RGS-CT Specification Sheet ~- ~~ tutsUU.UU 41.45 41.42 0.04 273.90 273.24 0.66 10825.00 41.74 41.70 0.04 274.33 273.64 0.69 10850.00 41.01 41.03 -0.02 274.72 273.92 0.80 10875.00 41.24 41.24 -0.01 275.68 274.95 0.73 10900.00 40.94 40.94 -0.00 277.17 276.41 0.76 10925.00 40.94 40.96 -0.02 277.61 277.05 0.57 10950.00 40.87 40.86 0.01 276.86 276.08 0.78 10975.00 40.40 40.51 -0.11 276.43 275.71 0.72 11000.00 39.91 39.91 -0.00 276.48 275.73 0.75 Average 0.0781 0.3361 Standard Deviation 0.0834 0.3498 Tolerance for both the Average and the Standard Casing 0.3° Casing 0.5° Deviation Drill i e 0.3° Drill i e 0 75° * Tnrlinatinn ~nrl Ate...., .t4. :..F,..-..,.i..r,..i ~ . __ ~_.____ __ __...~ ,. ~', ~..,, ,,,,,, ,,,v vv n. SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 10 of 30 AK0108G 101 Survey QC - RGS-CT Analysis Sheet SURVEY QUALITY CONTROL -DATA ANALYSIS RFFFRFN('F CYCTFMC Grid S stem Grid Correction 0.00 Azimuth reference: Grid True North TRUE NORTH Vertical reference: RKB MSL/Other RKB If other ive details TTF AN r)ATA De th 0.00 Inclination 0.00 Azimuth 0.00 TVD 0.00 Northin s 0.00 Eastin s 0.00 Latitude 70.3427 Az. Ref: Grid/True Grid Corrected Y N? Descri tion CALIBRATION Tool Number 6044 Calibration Date 22 Dec 2007 Calibration ran a From 51.23 ~ To 1120.30 Gyro operating range _ _ From. 58.52 To 95.14 Spec' -Within calibration range ~ FTFI f) RAI I TFGT /Only valiii nn fivc.i at~~~.-r~~. ~ ~ni4.e......« ., .-.-~H.i., : .~« ~,.u « .-« .ate«.. .._c.._....,..a -c...._ _ Cal value Pre "ob offset Post ob offset Abs dif.cal. ost Abs dif. re. ost Sec' Accel Scale 0.000000 0.000000 N A Cal/Post - 0.00015 Mass Unbalance 0.00 0.00 N/A Pre Post - 0.4°/hr IP{ITTALTSATTON De th A rox 2200.03 No of stns 7 Sec' -Min No. - 6 Azimuth Mean 259.28 Std deviation 0.11 Sec' - Azi SD 0.2° Inclination Mean 13.64 Std deviation 0.00 Sec' -Inc SD 0.1° Earth Horizontal Rate Mean Abs meas-theor 0.03 Std deviation 0.02 Sec' -See 167 DRIFT TOOLFACE RATE Maximum toolface rate 94.41 Sec' - 400/sec TN/OLIT COMPORTSON (A7T' N/A TF TN[" t1R°\ Inclination Difference Mean 0.08 Std dev' 0.08 5 ec's -Casin 0.3°/Drill i e 0.3° Azimuth Difference Mean 0.34 Std dev' 0.35 Sec's -Casin 0.5° Drill i e 0.75° Lateral Diver ence/1000 3.89 Sec - 5.0/1000 Vertical Diver ence/1000 0.78 Sec' - 2.0/1000 r1FPTH C(1NTRA1 Wireline Com an Schlumber er Line t e 7/32 Encoder SF Schlumber er Max De th TD 11000 CCL Corrected es Zero De th Ri u RKB 60.53AMSL Rezero De th 7.53 Given u ~oint de th Measured P] Strech cor. At TD divided b TD 1000 .7273 Sec' - 1.5 1000 Dif. Between ri u and rezero de the divided b TD 1000 1.46 5 ec' - 2.0 1000 Dif. Between iven and meas de th divided b meas 1000 1.37 Sec' - 2.0 1000 SURV-Q165 (OPS SUR-MA-010) 22nd Jan 2004 /Revision ZO Page 1 of 1 AK0108G_301 Survey QC - RGS-CT Acceptance Sheet FIELD AND SURVEY INFORMATIt7N Operator gp Field /Platform Schlumberger Mast Truck Well Number E -PAD E - 10A Survey section From 2200.00 ft. to 10940.00 ft. Date 1/21/2008 Gyrodata Job No AK0108G 101 Gyrodata Surveyors Steve Thompson Job Objective High Accuracy Gyro Survey SURVEY PERFORMANCE In Spec' QC Parameter Yes/No/NA Possible Actions Contact Duty Engineer to discuss options: Operational temperature within Yes 1. Recalibrate tool to higher temperature specification 2. Resurvey with backup tool 3. Resurvey 'Hot' section at higher speed Roll test data within specification Contact Duty Engineer to discuss options: Only va{id on land/fixed installations Yes 1. Recalibrate tool and reprocess survey 2. Resurve with backu tool Continuous initialisation within Take new initialisation, after three failures: specification Yes 1. Contact Duty Engineer or, 2. Resurve- with backu tool Contact Duty Engineer to discuss options: Toolface rate within specification Yes Resurvey section from previous bias check Investi ate and comment if effects are ne li ible Contact Duty Engineer to discuss options: Drift tunes within specification Yes 1. Reprocess with different software settings 2. Resurve with backu tool Inrun/Outrun comparison within Contact Duty Engineer to discuss options. specification Yes Resurvey is usually not required if either Inrun or outrun meet all other C arameters Depth control within specification Yes Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV-Q766 (OPS SUR-MA-003) 13~h Nov 03 /Revision 12 Page 1 of 1 AK0108G 101 B.P. Exploration Well: E-Pad E-10A Location; Mast Truck, 0 -50 -100 .. Z -150 O z -200 -250 -300 Prudhoe Bay, Alaska Interp Outrun Gyrodata AK0108G 101 DEFINITIVE OTTOM OLE OCATED D: 1100 .00 ~ - - i I - ~ ----~~ ~ --- -60 00 -55 00 -50 i 00 -45 00 -40 00 -35 00 -30 00 -25 00 -20 00 -15 00 -10 00 -50 0 f 0 • FASTING (ft) B.P. Exploration Well: E-Pad E-10A Location: Mast Truck, .. w 01 0 rn a~ ~1 .., w1 w J 1~ O Prudhoe Bay, Alaska Interp Outrun Gyrodata AK0108G 101 DEFTNTTTVF :4 - -- ~- -- '2 _ ~ 0 8 6 --- - - -.__ --- -- -- ----- - ---- _ - -- ----- - 4 - 2 -~ - -- ---- -------- ------ ----------- i 0 -- -- - -- - --- -- 5 --- ~ - ---- 4 _ BOTTO HOLE MD: 11 00.00 0 10 00 20 00 30 00 40 00 50 00 60 00 70 00 80 00 90 00 100 00 110 00 12n nn A MEASURED DEPTH (ft) B.P. Exploration Well: E-Pad E-l0A Location: Mast Truck, 50 45 40 35 O 30 z J v 25 z 20 15 10 5 0 Prudhoe Bay, Alaska Interp Outrun Gyrodata AK010$G 101 DEFINITIVE ---- - I I -- ---- ------- i - BOTTOM LOCATE M~ :- OLE 0 -- i ~ i~ ~ ~ 0 10 00 20 00 30 00 40 00 50 00 60 00 70 00 80 00 90 00 100 00 110 00 120 00 • • MEASURED DEPTH (ft) B.P. Exploration Well: E-Pad E-l0A Location; Mast Truck, 30C 250 200 N Q 150 100 50 Prudhoe Bay, Alaska Interp Outrun Gyrodata AK0108G_101 DEFINITIVE - - - -- OTTOM LOCATE ~MD: 110 OLE 0.00 -r - t - - ,- - ~-.- 0 100 0 20 00 30 00 40 00 50 00 60 00 70 00 80 00 90 00 100 00 110 00 ~2(l 00 MEASURED DEPTH (ft) • RECE\VED Scblum~erger (; ?1ì ;3 NO. 3914 AUG 2 3 2006 Alaska Data & Consulting Services 2525 GambeU Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth .:,~ Ci! & Gas eons. Ccm!TÚSSÍCn Anchorage Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave. Suite 100 Anchorage, AK 99501 /DA-oLfS- Field: Prudhoe Bay WI! CI CD J b D e o # Log escriptlon Date BL o or B-15 11221600 Lul.. 08/02106 1 F-22 11194169 LDL 02/17/06 1 P-14 11212851 LDL 04/28/06 1 F-24 . N/A PRODUCTION LOG 03/29/06 1 E-10A- 11047361 SENSA/MEMORY LDL 10/19/05 1 H-30' 11223103 LDL 03/19/06 1 A-37 11225946 PROD PROFILE W/DEFT 03/20/06 1 B-12A 11211386 PROD PROFILE W/DEFT & GHOST 03/31/06 1 G-06A 11258691 LDL 04/06/06 1 G-24 11258689 LDL 03/21/06 1 H-30 11217258 USIT 06/09/06 1 A-30A 40010566 OH EDIT OF MWD/LWD 06/26/04 2 1 A-30A PB1 40010566 OH EDIT OF MWD/LWD 06/21/06 2 1 A-30A PB2 40010566 OH EDIT OF MWD/LWD 06/25/06 2 1 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth 08/15/06 . . ~.. (STATE OF ALASKA ( ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Abandon 0 SuspendD Operation ShutdownD Perforate 0 WaiverD OtherD Alter CasingD RepairWellŒ] Plug PerforationsO Stimulate D Time ExtensionO Change Approved ProgramD Pull TubingD Perforate New Pool 0 Re-enter Suspended Well 0 2. Operator 4. Current Well Class: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc. 199-0450 Development ŒJ ExploratoryD 3. Address: P.O. Box 196612 6. API Number Anchorage, Ak 99519-6612 Stratigraphic 0 Service D 50-029-20623-01-00 7. KB Elevation (ft): 9. Well Name and Number: 60.53 E-10A 8. Property Designation: 10. Field/Pool(s): ADL-0208280 Prudhoe Bay Field / Prudhoe Oil Pool 11. Present Well Condition Summary: Total Depth measured 12784 feet true vertical 9027.3 feet Plugs (measured) 12185 Effective Depth measured 12185 feet Junk (measured) None true vertical 9026.5 feet Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 32 - 112 32.0 - 112.0 1490 470 Liner 1161 4-1/2" 12.6# L-80 10245 11406 7958.2 - 8849.4 8430 7500 Liner 1066 7" 29# L-80 10340 11406 8032.2 - 8849.4 8160 7020 Liner 1807 2-7/8" 6.16# L-80 10977 12784 8510.2 - 9027.3 13450 13890 Production 10817 9-5/8" 47# L-80 30 10847 30.0 - 8411.6 6870 4760 Surface 2702 13-3/8" 72# L-80 31 2733 31.0 - 2697.7 4930 2670 Perforation depth: Measured depth: 11710 - 11730, 11780 - 11830, 11920 - 12019, 12070 - 12250, 12320 - 12700 True vertical depth: 9010.21 - 9014.02,9020.59 - 9024.05,9027.2 - 9027.28,9025.83 - 9028.89,9028.48 - 9021.87 EO Tubing ( size, grade, and measured depth): 4-112" 12.6# L-80 @ 28 - 10245 R E C E \\1 2-7/8" 6.5# L-80 @ 5993 - 6036 1.004 Packers & SSSV (type & measured depth): 4-1/2" Baker HB Packer @ 10268 JAN ~ 1 . 4-1/2" Eclipse Patch Packer @ 5993 C OS comm\SS\On 4-1/2" Eclipse Patch Packer @ 6032 &. GaS 0 . 12. Stimulation or cement squeeze summary: ~nt"O{a Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13 RePresentative Dailv Averaae Production or Iniection Data Oil-Bbl Gas-Met Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 825 22.4 15 540 823 Subsequent to operation: 1086 27.4 67 210 329 14. Attachments: 15. Well Class after proposed work: ExploratoryD DevelopmentŒ] ServiceD Copies of Logs and Surveys run - 16. Well Status after proposed work: Operational Shutdown D OilŒJ GasD WAG 0 GINJD WINJD WDSPLD Daily Report of Well Operations. ~ Prepared by Garry Catron (907) 564-4657. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Garry Catron NI A Printed Name Garr Catron Title Production Technical Assistant Signature Phone 564-4657 Date 1/20/04 12i209y" ':- .'- ... J R(}¡.Q iÍ)) fìI 200A ~S BFl ~"~~~I: '..,~\rr::"~~;'~-: J ',r i-in'8 {¿,.èlJ ' , ¡¡ INIKIIR .. (' (, E-10A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 09/05/03 T/I/O = 150/540/80 temp = S/I. IA FL for E-line. IA FL @ surface. 09/05/03 T/I/0=200/500/0 assist e-line Mit IA to 3000 psi Failed 3 tests 1 st test Lost 200 psi in first 15 min 2 nd test lost 150 psi in 1 st 15 min. and 125 psi in 2 nd 15 min. 3 rd test lost 125 psi in 1 st 15 min. and lost 100 psi in 2nd 15 min. took 9 bbls crude to pressure up, Bled pressure off, Final WHP= 125/500/90. 09/05/03 SET 4.5in ECLIPSE PATCH WITH CENTER ELEMENTS AT 60311 AND 59961 MD ACROSS LEAKING GLM. NO PROBLEMS RIH OR POOH. HAD TO PUMP BEHIND TOOL ON SECOND RIH TO GET UPPER ELEMENT TO SEAT IN LOWER ELEMENT BEFORE SETTING UPPER ELEMENT. DID NOT TAG TD. LEFT WELL 09/06/03 T/I/0=120/900/80. MITIA to 3000 psi INCONCLUSIVE/ leak rate=1.2 GPM @ 3000 psi (post Patch); initiallA FL at surface. Pumped 8 bbls to pressure IA to 3000 psi. First test lost 200 psi in the first 15 minutes second test lost 160 psi in 15 minutes the fourth test lost 130 psi in 15 minutes and the fifth test lost 130 psi in the first 15 minutes and 90 psi in the second 15 minutes for a total of 220 psi in 30 minutes. Pumped a test volume of 138 gallons in 118 minutes for an average leak rate of 1.2 GPM @ 3000 psi (leak rate was 0.9 GPM during final 35 minutes). Pumped 11 bbls of diesel down the IA. Final WHP's = 120/950/80. 09/10/03 T/I/O= 450/330/260. TIFL PASSED (POST PATCH) WELL ON-LINE @ 72*F. NO AIL. IA FL @ SURFACE. SI WELL AND STACKED-OUT TO 2250 PSI IN 2 HRS AND 30 MINUTES. lAP DROPPED FROM 330 PSI TO 120 PSI DURING WELL STACK-OUT. TIFL PASSED. POp1D WELL FOR DSO. MONITORED FOR 30 MINUTES. FINAL WHp1s= 1580/210/260 FLUIDS PUMPED BBLS 1 50/50 Methanal 11 Diesel 12 Crude 24 TOTAL Page 1 ~ (. TREE = 6" CrN W8..LHEAD = FMC E 1 OA SAFETY NOTES: 700@ 11652' & 90° @ 12006'. ACfl.LA. TOR = AXELSON - **ECUPSE PATCH COVERS GLM #2- KB. ELEV = 60.53' BF. ELEV = 32.36' KOP = 2100' Max Ange = 94 ~ 12515 2082" 4-1/2" SSSV CAMOO LANDING NP. ID= 3.813" Datum MD = 11420' (I) Datum TVD = 8800' SS 13-3/8" CSG 72# L-80 D = 12.347' GAS LIFT MA.NCR8..S . , , ST fvD TV D LEV TYPE VL V LATa; PORT DATE " -", 2 3146 3000 36 CA M DMY RK 0 08/12/03 4-1/2 EQ..IPSE PA TCH, ID - 2.25 5993 1 6008 5000 50 CAM **DMY RK 0 08/12/03 ** STATION #1 = DMY HAS EXTEIÐEDPACt<lNG Minimum ID = 2.25" @ 5993' 4-1/2" PARKER sws NP, ID=3.813" 4-112" ECLIPSE PATCH -14-1/2" BKR R3RSEAL ASSY, D =4.00" I 10268' 9-5/8" X 4-1 (2" BKR REr HB PKR, ID = 4.0" TOP OF 7" LNR 10340' 9-5/8" CSG, 47#, L-80, ID = 8.681" BKR GS SLEEVE, ID = 3.00" 14-112" lEG, 12.6#, L-80, .0152 bpf,lD =3.953" 1-1 11406' I PERFORATION SUMMA. RY MILLOur WINDOW 11406' - 11420' BA KER A NCI-K:>R PKR @ 11420' REF LOG: SWS MWD-GR ON OS/24/99 ANGLEA TTOP PffiF: 78 @ 11710' f\bte: Refer to A"oduction DB for historical perf data SIZE SPF INTffiVAL Opn/Sqz DATE Z' 4 11710- 11730 0 04/23/01 Z' 4 11780 - 11830 0 OS/26/99 2" 4 11920-12019 0 OS/26/99 2-718"BAKERCIBP 2" 4 12070 - 12250 C 08/12/00 MLLED / PUSHED DOWN 2" 4 12320 - 12700 C 08/12/00 06/02/03 4-1/2" BRIDGE R..UG 7' LNR, 29#, L-80, .0371 bpf, ID = 6.184" DATE REV BY COMMENTS DATE REV BY OOMMENTS PRUDHOE BA Y UNIT 08/18/81 ORIGINAL COMPLETION 09/05/03 BJMKK SET 4-1/2" ECLIPSE PA Ta; W8..L: E-10A OS/26199 JAM SIDETRACK (E-1 OA) 09/17/03 CMO/TLP ÆRF ANGLE OORRECfION ÆRMT No: 1990450 03/05/02 RNrrp OORRECfIONS API No: 50-029-20623-01 06/02103 CJSrrLP MLL / PUSH CIBP SEC 6, T11 N. R14E, 353' SNL & 500' W8.. 06/19/03 JCMrrLH GL V C/O 08/13/03 JCMrrLH GLV C/O BP &ploration (Alaska) 08/05/03 Schlumberger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth NO. 2933 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Endicott Color Well Job # Log Description Date Blueline Prints CD D.S. 9-04A I ~ ,.~-('~),.~ z4 PROD PROFILE/DEFT 07/31/03 NK-38 ! ~ ~/' / '~[ STATIC PRESSURE SURVEY 0S/01/03 E-10A ~ ~ ~ ' (~')/.L.(?'~ LDL 07/07/03 C-16I ~-~-'~_.~ t ~ GRAVEL PACK WIRST-C 04~30~03 D.S. 1t-16 ~ ~ (C,~ ~..:'~.c~ PROD PROFILE/DEFT/GHOST 06105/03 R-34 i\~','c~"~ .... c'¥'~ INJECTION PROFILE 05/17/03 D.S. 7-21 ".~ -~(.~\_~ LDL 07/30/03 D-14A ~ ~'~ ~-'" t, ~'-~,-~ LDL 07/28/03 P2-03 1 _~ "~-' O%{ ~ CHF" 05/03/03 A-06 I ~ ~ '~_..~' ~ ~ PROD PROFILE/DEFT 06/27/03 D.S. 4-11A \ ~ ~- ~.~-~ LDL 07/21/03 3-25/M-27 t c'~--:-. ~->;~...~. SCMT (REPRINT-DEPTH SHIFTED) 01/04/03 -*S-28B ~-~?~ °~ '-~%~ ,. 23414 CH MEM GR (PDC) 03/09/03 *{PRINTS SENT OUT 5/08/03) PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Schlumberger GeoQue,st .'., ..... 3940 Arctic Blvd, .Suite 300 Anchorage, AK 99503-5711 · , ATTN: Beth ,, Received by: 07/16/O3 Schlumberger NO. 2905 Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Endicott Color t' Well Job # Log Description Date Blueline Prints CD B-36 I'~SI' ( ¢ "O I 0,?-"2 LDL 07109/03 1 E-10A i C('C~- - (~ L[7~--~_-~ LDL 07107/03 1 J-18 ~ ~ - ~ LDL 07101/03 D.S. 15-06~ ~- ~,~ ~1 LDL 07104/03 ~D.S. 15-27. ~~'Q LDL 07/14/03 1-55/R-25 [~-~.~ -- LDL 07109103 12-S2/S-14 ~ -~ ~ PROD PROFILE W/DEFT & GHOST 07113103 1 ,I .... PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 .... ~ ' ~ · , E uE VED Date Delivered: JUL z.:o XXXX Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Received STATE OF ALASKA ( ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Abanon[~ Suspend[--] Operation Shutdownr-] Perforater"'~ VarianceC~ Annuar Disposalr-~ After Casingr'~ RepairWellr-'] Plue Pe~orations~ Stimulate~ Time E~ension~ Other~ Change Approved Program ~ Pull Tubing ~ Pedorate New Pool ~ Re-enter Suspended Well ~ MILL ClBP 2. Operator 4. Current Well Class: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc. Development ~ Explorato~ 199-045 3. Address: P.O. Box 196612 6. APl Number Anchorage, Ak 99519-6612 Stratigraphic ~ Se~ice~ 50-029-20623-01-00 7. KB Elevation (fi): 9. Well Name and Number: 60.53 E-10A 8. Prope~y Designation: 10. Field/Pool(s): ADL 028280 Prudhoe Bay Field / Prudhoe Bay Oil Pool 11. Present Well Condition Summa~: Total Depth measured 12784 feet true ve~ical 9027 feet Plugs (measured) Pushed CIBP to 12185' (06/02/2003). Effective Depth measured 12185 feet Junk (measured) true ve~ical 9027 feet Casing Length Size MD TVD Burst Collapse Conductor 110' 20" 138' 138' 40K 520 Sudace 2705' 13-3/8" 2733' 2698' 80K 2670 Intermediate 10819' 9-5/8" 10847' 8412' 80K 4760 Liner 1065' 7" 10340'-11405' 8032'-8849' 80K 7020 Sidetrack Liner 1798' 2-7/8" 10986'-12784' 8517'-9027' 80K 11160 Peroration depth: Measured depth: Open Pe~s 11710'-11730', 11780'-11830', 12070'-12185'. Open Pe~s Below Loose CIBP 12185'-12250', 12320'-12700'. True ve~ical depth: Open Pe~s 9010'-9014', 9020'-9024', 9028'-9027', Open Peffs Below Loose CIBP 9027'-9029', 9028'-9022'. Tubing: (size, grade, and measured depth) 4-1/2" 12.6~ L-80 TBG ~11406'. [~ ~'~ (,~,,7 Packers & SSSV (type & measured depth) 9-5/8" x 4-1/2" BKR RET HB Packer ~ 10268'.JUL 4-1/2" Camco SSSV Landing Nipple ~ 2082'. 12. Stimulation or cement squeeze summary: ~ ~.~,¢;.~.~,~,~ Intewals treated (measured): Treatment descriptions including volumes used and final pressure: 13 Representative Daily Average Production or Iniection Data Oil-Bbl Gas-Mcr Water-Bbl Casin~ Pressure Tubing Pressure Prior to well operation: 492 25783 10 509 Subsequent to operation: 385 23537 6 188 14. A~achments: 15. Well Class after proposed work: Explorato~ Development~ Se~ice~ Copies of Logs and Suweys run _ 16. Well Status after proposed work: oi~ sasD WAGD S~NJD W~NJD WDSPL Daily RepoA of Well Operations __X 17. I hereby ceAify that the foregoing is true and correct t~~ of my knowledge. ~Sund~ Number or N/A if C.O. Exempt: Contact DeWayne R. Schnorr ~ N/A Printed Name DeWayne R. Schnorr Title Techical Assistant Signature ~~~~~ Phone 907/564-5174 Date June17, 2q03 Form 10-404 Revised ~i/~NE~ JUL (~ 9 2~03 O5/23/2OO3 O5/27/2OO3 05/30/2003 05/31/2003 06/01/2003 06/02/2003 06/15/2003 O5/23/O3 O5/27/O3 05/30/03 05/31/03 06/01/03 E-10A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS ANN-COMM (AC-EVAL AND REPAIR): AC-TIFL ANN-COMM (AC-EVAL AND REPAIR): AC-FLUID LEVEL ANN-COMM (AC-EVAL AND REPAIR): AC-EVAL; AC-MITIA ANN-COMM (AC-EVAL AND REPAIR): AC-EVAL; AC-MITIA PACKERS/BRIDGE PLUGS/POGLMS: MILL PACKERS/BRIDGE PLUGS/POGLMS: CAST IRON BRIDGE PLUG; MILL TESTEVENT--- BOPD: O, BWPD: O, MCFPD: 840, AL Rate: 0 EVENT SUMMARY T/I/O: 360/1140/740. TIFL FAILED(EVAL TxlA COMM). IA CASING VALVE DOES NOT HOLD. INITIAL IA FL @ 34147 STACKED WELL OUT TO 2050/1120/740 WITH NO CHANGE IN IA FL. BLED IA FROM 1140 PSI TO 1020 PSI IN 10 MINUTES (FLUID TO SURFACE). PUT WELL BACK ON PRODUCTION. REMOVED "TROUBLE WELL" SIGN FROM MASTER VALVE. FINAL WHPs = 600/1020/700. TIO= 1850/1150/770 (?) IA FL NEAR SURFACE. FLOWING @ 87 DEGREES. TIO= 2250/880/420 MITIA TO 3000 PSI (Eval T x IA). CONTINUE TOMORROW. WELL IS SI ON ARRIVAL. INITIAL IA FL @ 144' (8 BBLS). BLED lAP FROM 880 PSI TO 140 PSI IN 7 HOURS. PUMPED 22 BBLS OF DIESEL DOWN THE IA TO 1700 PSI. TRI-PLEX IS NOT PUMPING TO ITS CAPABILITY. SHUT DOWN PUMP AND CONTINUE TOMORROW, REPLACE PUMP. FINAL WHPs = 2250/1700/380 FO NOTIFIED NOT TO POP. TIO= 2250/1250/350 MITIA TO 3000 PSI FAILED (EVAL T x IA). lAP DECREASED 450 PSI FROM YESTERDAY. IA CASING VALVE NOT HOLDING, CALL GREASE CREW TO SERVICE VALVE. NO A/L LINE ON WELL. PUMPED 11 BBLS OF DIESEL DOWN THE IA TO 3000 PSI, IN THE FIRST 15 MINUTE TEST, IA LOST 80 PSI, IN THE SECOND 15 MINUTE TEST, IA LOST 50 PSI FOR A TOTAL OF 130 PSI IN 30 MINUTES. PUMPED IA BACK UP TO 3000 PSI, IN THE FIRST 15 MINUTE TEST, IA LOST 80 PSI, IN THE SECOND 15 MINUTE TEST IA LOST 50 PSI FOR A TOTAL OF 130 PSI IN 30 MINUTES. PUMPED IA BACK UP TO 3000 PSI, IN THE FIRST 15 MINUTE TEST, IA LOST 70 PSI, IN THE SECOND 15 MINUTE TEST, IA LOST 50 PSI, IN THE THIRD 15 MINUTE TEST, IA LOST 50 PSI FOR A TOTAL OF 170 PSI IN 45 MINUTES. MONITORED FOR 30 MINUTES LONGER WITH A LOSS OF 60 PSI AND 50 PSI IN 15 MINUTE INTERVALS FOR A TOTAL OF 280 PSI IN 1 HOUR 15 MINUTES. THERE WAS NO CHANGE IN TP OR OAP DURING THE TEST. BLED lAP TO 1620 PSI. FINAL WHPs - 2250/1620/350 FO NOTI FED OF TEST. MIRU COIL #5. MU BAKER MILL (2.3" PARABOLIC) AND MOTOR WITH JARS. FLOW WELL TO SYSTEM. RIH AND TAG UP @ 11734'. MILLED THROUGH Page I E-10A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 06/01/03 (CONTINUED) SECTION. HAD OVERPULLS EACH TIME THROUGH THIS SECTION. RIH AND TAG PLUG @ 112050' CTMD. MILL WITH MULTIPLE STALLS (8). GETTING 10K OVERPULLS. SEEMS TO BE DEBRIS ON TOP PLUG. POOH AND PICKUP VENTURI BASKET. RIH. WORK VENTURI BASKET DOWN ON TOP OF CIBP, POOH. RECOVERED 4 SMALL CHUNKS OF METAL AND SOME GRAVEL. RIH WITH 2.3" MILL AND STARTED DRILLING. 06/02/03 CTU #5, MILL CIBP. MILL CIBP @ 12050'. CIBP BROKE LOOSE, ABLE TO SPIN AND PUSH IT TO 12185' WITH MULTIPLE STALLS. COULD NOT MAKE ANY MORE PROGRESS. CALLED ANCHORAGE (AL SCHMOYER) AND DECIDED TO POOH AND POP WELL. LEFT A COLUMN OF CRUDE WITH WELL SHUT-IN TO BUILD PRESSURE. WILL POP ASAP. NOTIFY WELLS COMPLETION SUP OF POSSIBLE VALVE INSTALL AND DIRTY GL. <<< JOB COMPLETED >>> 06/15/03 TESTEVENT--- BOPD: 0, BWPD: 0, MCFPD: 840, AL RATE: 0 FLUIDS PUMPED BBLS 45 50/50 METHANOL WATER 35 DIESEL 933 2% EXTRA SLICK KCL WATER 150 CRUDE 21 FLO-PRO 1184 TOTAL Page 2 TREE = 6" ClVV E 10A ~I=0ATOR'''; ..... -A'X~_i~S'O~ --, S~Y NOTES: 70° ~ 11652' & 90° ~ 1 2006' K~ = 2100' Datum ~D: ~00' SS 2 3~4~ 3000 3~ ~MI RK ~ ~ 10986' ~ [ 1 6008 5000 50 mM 4K Mini~u~ ID 2.~" 2-7~8" LINER I o-s/~"cs~,47~,~-oo,~:o.~a~"~ ao84~' ~ I BA~RA~R ~KR ~ ~ ~420' ~F kOG: SWS MWD-GR O~ 05/241~ ANGLEATTOP P~F: 79 ~ 11710' ~te: R~erto ~oduc~on DB for hisDrical ~rf data ~ ~4~8'Ifl TA~I SIZE S~ INT~VA L ~n/~z DATE 2.' 4 11710- 117~ O ~/23/01 2.' 4 11780 - 11830 O 05~26~99 2.' ~ 4 11920 - 12019 O 05~26~99 2-7~" BAKERCIBP Z' 4 12070 - 12250 C 08/12/00 MILLED / P~HED DOWN Z' 4 12320 - 12700 C 08/12/00 06~02~03 I~TD I~ 11758' ~ I 2-7/8"TBG, 6.4¢,L-80,.00579bpf, ID=2.441" ~ 127~' ~ I I 7'LNR, 29~,L-80,.0371bpf, ID=6.184" ~ 11800'I ~TE R~ BY ~MM~TS DA~ ~ BY COMMEN~ PR~EBAY UNE 08/18/81 O RGI~ L COOL.ION WELL: B 10A 05~6/99 ~M SI~~ ~M~ION I P~ME No: 199~50 01~9/01 SI~QAA CO~T~ TO ~AS AR No: ~-029-20623-01 02~7/01 SI~LG FINAL SEC6, T11N, R14E, ~3'S~ &500' WEL 03/05/02 R~TP CO~TDNS 06/02/03 CJS/TLP MILL / ~SH QBP ~ BP ~ploration (Alaska) PERFORATION SUMMA RY REF LOG: SWS MWD-GR ON 05/24/99 ANGLEATTOP PERF.' 79 @ 11710' Note: Refer to RroduclJon DB for historical perf data SIZE SFF INTERVAL Opn/Sqz DATE 2" 4 11710- 11730 O 04/23/01 2" 4 11780 - 11830 O 05/26/99 2" 4 11920 - 12019 O 05/26/99 2'' 4 12070 - 12250 C 08/12/00 Z' 4 12320 - 12700 C 08/12/00 DATE REV BY COMMENTS DATE REV BY COMMENTS 08/18/81 O RIGINA L COIVPLETION 05/26/99 JAM SIDETRACK COMFLEDION 01/29/01 SI~QAA CONVERTED TO CANVAS 02/27/01 SI~LG FINAL 03~05~02 RN/TP CORRECTIONS 06102103 CJS/TLP MILL / PUSH CIBP 199-045-0 PRUDHOE BAY UNIT E-10A 50- 029-20623-01 Roll #1: Start: Stop MD 12784 TVD 09027 _ Roll #2: Start Stop Completion Da .'~" 57~6/99 Completed Status: 1-OIL BP EXPLORATION (ALASKA) ~c Current: T Name c 9312~ D 9337t~''~ D 9545 ~ L NGP-MD L NGP-TVD L PROD k~ R SRVY LSTNG R SRVY RP~' Interval 1 SCHLUM MCNL 1-3 SPERRY GR 1 PDS PROD FINAL 10750-12700 5/25/99 FINAL 11430-12784 FINAL 8788-8967 FINAL 10854-12708 BHI 11400.-12780. SPERRY 11400.-12784. CH 8/25/99 OH 9/2/99 CH 5/10/00 CH 2 8/25/99 OH 9/9/99 OH 9/9/99 CH 5 5/10/00 OH 6/24/99 OH 6/24/99 Sent Received T/C/D 8/26/99 9/14/99 5/10/00 8/26/99 c 9/14/99 D 9/14/99 5/10/00 D 6/29/99 D 6/29/99 D Wednesday, May 02, 2001 Page 1 of 1. WE .L TRANSMI AL ~mm~ct~ve D~g~ost~c Se~v~ces, I~c. To: State of Alaska AOGCC Lori Taylor 3001 Porcupine St. Anchorage, Alaska 99501 RE: Distribution - Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Robert Richey POS, Inc. Mail Pouch 340112 Prudhoe Bay, AK 99734 BP Exploration (Alaska), Inc. Petrotechnical Data Center MB 3~ 900 E. Benson Blvd. Anchorage, AK 99508 LOG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT{S) OR CD-ROM FILM BLUELINE Open Hole I I 1 E-10 4~29-0~ Res. Eval. CH I 1' 1 · , Mech. CH Caliper Survey I Rpt or Signed' Date' ~ 1 0 ~.0D0 Print Name: AJask~ 0ii & Gas Cons. Anchorage ProActive Diagnostic Services, Inc., Pouch 340112, Prudhoe Bay, AK 99734 Phone:(907)659-1307 Fax:(907)659-2314 E-mail: pdsprudho~NA$00.nct ~Vcbsit¢: 0 F! I I._1-- I I~ I~ WELL LOG TRANSMYFrAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Loft Taylor 3001 Porcupine Drive Anchorage, Alaska 99501 ~q' MWD Formation Evaluation Logs E-10A, 0¼% AK-MW-90122 September 9, 1999 E-10A: 2"x 5"MD Gamma Ray Logs: 50-029-20623-01 2"x 5" TVD Gamma Ray Logs: 50-029-20623-01 1 Blueline 1 Rolled Sepia 1 Blueline 1 Rolled Sepia PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO TltF. ATrENTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 ,. · ~. Date: -" :4 i999 ,4la~i~ 0il & Gas Co~s. Com~tt ,'i~or~ BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Signed~f 2/L~x-~ 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Loft Taylor 3001 Porcupine Dr.~._:?" Anchorage, Alaska 99501 ":.., RE: MWD Formation Evaluation Logs E-10A AK-NfvV-90122 September 2, 1999 1 LDWG formatted Disc with verification listing. API#: 50-029-20623-01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATYACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 5631 Silverado Way, Suite G. Anc h o.r, ag~e, ..Alas_k.a. l~ ~ ~ Date: BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchor~e, Alaska 99519-6612 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. 12779 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Prudhoe Bay (Cased Hole) 8/25/99 Well Job # Log Description Date Blueline Sepia CD E-10A ~ ~'..~i'~, 99235 MCNL g90525 1 1 1 E-28A DEPTH DETERMINATION LOG 990818 1 1 F-23 LEAK DETECTION 990818 1 1 G-21 PRODUCTION PROFILE 990813 ! 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519.-6612 Date Delivered: Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK~9503-5711 Received'by: . [ ~ STATE OF ALASKA .. ~~j/~~/~ ALASKA OIL AND GAS CONSERVATION coMr~ISSION WELL COMPLETION OR RECOMPLETION REPORT AND L~~,;,:~.~' ' ,. ~ ~. 1. Status of Well Classification of Service WefC~,~z~... - [~Oil [--I Gas E~ Suspended I~Abandoned I~Service '~/~*~&~' C~/~ ~2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 99-045 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612~ ~_._ _~' 50-029-20623-01 4. Location of well at surface ~ 9. Unit or Lease Name 353' SNL, 500' WEL, SEC. 06, T11N, R14E, UM !' ~ ;i~'i'.'-~?~'~": ~'i'!- ~; ~~.,~,~ ~ Prudhoe Bay Unit At top of productive interval i~'~~ , ~ 10. Well Number 599' SNL, 2050' WEL, SEC. 01, T11N, R13E, UM E-10A At total depth i ~~ ! , 11. Field and Pool 809' SNL, 1334' WEL, SEC. 01, T11 N, R13E, UM ..... ~ ' ............... ~ Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE = 60.53' AMSLI ADL 208280 12. Date Spudded J 13. Date I.D. Reached I 14. Date Comp., Susp., or Aband.115. Water depth, if offshore 116. No. of Completions 5/22/99 5/24/99 5/26/99 N/A MSLI One 17. Total Depth (MD+TVD) 18. P~ugB~~kD~p~h(MD+TVD)~~~.Di~~cti~na~Surv~y~2~.D~p~hwh~~~~~~~se~~2~~~hickness~~Pe~ma~~~s~ 12784 9027 FT 12718 9023 FTI [~]Yes E~No (Nipple) 2082' MD 1900' (Approx.) 22. Type Electric or Other Logs Run CNL, GR, POP, CCL 23. CASlNG~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20"X 30" Insulated Conductor Surface 110' 36" 8 cu yds concrete 13-3/8" 72# L-80 Surface 2733' 17-1/2" 4185 cuft Arcticset II 9-5/8" 47# L-80 Surface 10847' 12-1/4" i1565 cuft Class 'G', 130 cuft Arcticset I 7" 26# L-80 10340' 11405' 8-1/2" 480 cu ft Class 'G' 2-7/8" 6.16# L-80 10986' 12784' 3-3/4" 79 cu ft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2" Gun Diameter, 4 spf 4-1/2", 12.6#, L-80 10268' 10268' MD TVD MD TVD 4-1/2" tailpipe 10268' - 11405' 11780' - 11830' 9020' - 9024' 11920' - 12019' 9027' - 9027' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 12070' - 12250' 9026' - 9029' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 12320' - 12700' 9028' - 9022' 2000' Freeze Protect with 15 Bbls of MeOH O,P, 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) May 29, 1999 I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAs-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. 23N 11461' 8892' 23P 11466' 8896' 22N 11517' 8928' 22P 11524' 8932' 21N 11567 8957' 21P 11575 8961' Zone 1B / 14N 11617' 8980' 14P 11646' 8992' 31. List of Attachments Summary of Daily Drilling Reports, Surveys '32. I hereby certify that the fore, going is true and correct to the best of my knowledge Terrie Hubble ,,' ~v,-%, Title Technical Assistant III Date E-10A 99-045 Prepared By Name/Number: Terde Hubble, 564-4628 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL)or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Well: E-10A Accept: 05/19/99 Field: Prudhoe Bay Spud: 05/22/99 APl: 50-029-20623-01 Release: 05/26/99 Permit: 99-045 CTD Unit: Nordic #1 05/20/99 1 Move DS/N #1 from E-05a to E-10. Accept for operation at 1630 hrs 5/19/99. ND tree cap. NU BOPE. Test BOP. AOGCC witness waived by Lou Grimaldi. PU Baker whipstock and running tools. TIH and latch whipstock anchor into packer. Shear off whipstock at 14K over. Top of Whipstock 11406', RA tag at 11418'. POOH, LD whipstock running tools. PU window milling BHA #1. TIH 05/21/99 2 Finish RIH with starter mill. Cut 1.75' in 1.25 hrs. POOH. LD starter mill. MU window mill. RIH with BHA #2. Mill window from 11405- 11425. Began stalling, unable to mill. POOH. One blade had broken off window mill. Discussing options at report time. 05/22/99 3 11430' RU WL, attempt to fish mill blade. Got metal shavings and cement. PU diamond mill and string reamer, TIH. Mill from 11425-11430. Mill torquing and motor stalling from 11425-11426.5 then smoothed out and milled ahead. POOH. Mill worn smooth on break-over to OD, no metal marks on face. PU drilling BHA, change out CT connector. Pull test and pressure test connector. TIH. 05/23/99 4 11769' Finish RIH with drilling BHA #1 (2.0° motor). RIH thru window to TD. Drill from 11430-516' building angle and displacing to used FIo Pro mud. Penetration rate slowed after several stalls at 11500'. POOH for bit. Had trouble getting back thru window. Finish POOH. LD drilling BHA. MU window dressing BHA. RIH with milling BHA #4 (junk mill and two string reamers). Clean up window area, POOH. PU Drilling BHA, TIH. Orient and drill to 11769'. POOH for lighter bend motor, pipe stuck coming off bottom. Work pipe free and continue POOH. 05/24/99 5 12784' Finish POOH for motor. Change bit and motor. RIH with BHA #3 (1.7° motor) to TD. Finish build and continue turn while drilling from 11769-965'. Entered target sand at 8967' TVD at 11910'. Wiper trip to window. Tie-in, add 2.0'. Swap to new FIo Pro mud. Drill horizontal and continue turn in target sand from 11965- 12220' (8966' TVD). Wiper trip to window. Drill horizontal and continue turn from 12220-12784. Pull to window and GR log for correlation, correct depth (+4'). Final TD of we11-12,784'. POOH for liner. E-10A, Coil Tubing Drilling Page 2 05/25/99 6 12784' Finish POOH and LD drilling BHA. MU 55 jts 2-7/8" 6.16# L-80 STL liner. Install Baker CTLRT and CTC. RIH with liner on 2-3/8 CT to TD at 12784'. Pump 5/8" ball and release from liner. Displace mud to 2% KCL water. RU DS cementers. Load CT with 14.0 bbls Class G cement with latex. Load wiper dart. Displace w/2% KCI, dart on seat and sheared at 3800 psi. Displace Liner Wiper Plug to Latch Collar. Plug latched up and pressure to 2500 psi. Bleed off pressure and check floats--held OK. All displacement volumes correct. Pressure to 400 psi and pull out of top of liner. Wash up liner top and circulate while POOH. Got cement returns to surface. PU nozzle and 1 iA" CS Hydril, TIH and wash into liner. Wash to PBTD at 12717', spot liner full of 100K LSRV FIo-Pro, POOH and stand back 1 lA,, CS Hydril. 05/26/99 7 12784' Stand back workstring. MU logging tools. RIH with SWS memory GR/CNL on work string. RIH on CT. Log 10750-PBD. POOH with CT. Stand back work string. RIH w/2" perf guns & 15 stds 1-1/4" CS hydril. Fired guns w/3000 psi (5/8" steel ball). Perforated 11780-11830', 11920- 12018', 12070-12250' (25J UJ 4 spf) and 12320-12700' (PJ 2006 4 spf). Monitored well. Lost 2 bbls in 10 min. POH. Stood back CSH. LD 2" perf gUns. All shots fired. 05/267/99 8 12784' Load out perf guns. TIH to 2000' and freeze protect tubing. ND BOP, clean pits. Release Rig 10:30 hrs. 5/26/99 ~.,) .ri 8 . 90(10 g 1 ('](1 ...... [ ......... 1 ....... ] ........ 300 200 100 0 100 7]00 L ........ L I P. Exploration (True) Structure · Pod E Field : Prudhoe Bay Well ' E-IOA, 50-029-20623-01 Location : North Slope, Alaska 7000 6900 6800 .... I __.-L I I __ t __..--t___. <- West (feet) 6700 6600 6500 6400 6300 6200 6100 .L...__L ....... L___J ..... l .... 1 ...... L .... L____L__. I I ...--L-_--_L Created by potnls Date plotted : 3-Jun-1999 Plot Reference is E-IOA. Coordinates ore in teet reference E-10 True Vert;cal Depths ore relerence RKB - MSL = 60.Sft .... Raker Hugtle= INTE'Q .... 6000 5900 5800 5700 5600 5500 I I L .1 .... II I I I I .. --i ' Projected to TD ~,'~ ...... ~.~ ......... i i I .... i i i i i i ['-- i-[-- i i --- i i '--" i i 1 200 300 400 500 600 700 800 900 1000 11 O0 Vertical Section (feet) -> Azimuth 156.00 with reference 21,3.06 S, 6276.01 W from E-lO I .... -T ..... F ..... F .... I I --i ' '1 1200 1500 1400 1500 100 2(10 500 4O0 5O0 6 0 0 700 BOO 1000 0 B.P. Exploration (True) Pad E E-10A E-10 Prudhoe Bay North Slope, Alaska SURVEY LISTING by Baker Hughes IN~fEQ Your ref : E-10A Our ref : svy146 License : 50-029-20623-01 Date printed : 3-Jun-1999 Date created : 28-May-1999 Last revised : 3-Ju_n-1999 Field is centred on 708179.340,5930615.440,999.00000,N Structure is centred on 664940.580,5977074.330,999.00000,N Slot location is nT0 20 33.624,w148 39 55.017 Slot Grid coordinates are N 5976710.000, E 664449.000 Slot local coordinates are 353.45 S 499.51 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North B.P. Exploration (True) Pad E,E-10A Pru~qte Bay,North Slope, Alaska S~VEY LISTING Page 1 Your ref : E-10A Last revised : 3-Jun-1999 Measured Inciln Azimuth Subsea R E C T A N G U L A R Dogleg Vert G R I D C O O R D S Depth Degrees Degrees Depth C O 0 R D I N A T E S Deg/100ft Sect Easting Northing 11400.00 35.27 278.71 8784.00 11405.00 35.25 278.73 8788.09 11440.93 39.11 272.59 8816.73 11470.92 46.64 267.47 8838.70 11494~92 49.53 263.37 8854.73 213.06S 6276.01w 1.55 0.00 658179.64 5976358.93 212.62S 6278.86w 1.42 -2.30 658176.78 5976359.30 210.54S 6300.43W 14.99 -18.78 658155.16 5976360.91 210.59S 6320.81W 27.65 -32.90 658134.79 5976360.41 212.035 6338.60w 17.51 -44.22 658117.04 5976358.58 11548.40 57.64 254.23 8886.49 11582.38 60.65 245.93 8903.94 11620.70 64.7- 232.36 8921.57 11652.17 69.9£ 223.04 8933.70 11683.02 74.15 212.85 8943.22 220.54S 6380.67W 20.45 -67.32 658075.17. 5976349.14 230.50S 6408.04W 22.75 -79.18 658048.02 5976338.59 247.97S 6437.14W 33.23 -86.82 658019.32 5976320.48 267.51S 6458.55w 31.91 -87.64 657998.34 5976300.47 290.64S 6476.54w 34.26 -83.50 657980.87 5976276.96 11694.67 75.94 208.80 8946.23 11718.60 78.93 200.19 8951.44 11757.99 82.~5 188.24 8957.69 11789.06 85.34 181.03 8960.88 11818.26 86.75 175.93 8962.89 300.30S 6482.31W 36.83 -80.55 657975.32 5976267.17 321.54S 6491.97W 37.27 -71.99 657966.12 5976245.73 359.!7S 6501.48W 31.58 -51.53 657957.44 5976207.90 389.95S 6503.97W 24.40 -3!.11 657955.63 5976177.08 4!9.06S 6503.20W 18.08 -9.64 657957.04 5976147.99 11861.29 87.1~ 165.03 8965.21 11902.19 89.3~ 154.31 8966.50 11940.24 89.56 145.35 8966.88 11971.11 89.6~ 139.66 8967.09 12005.96 90.75 132.69 8966.98 461.37S 6496.!0W 25.31 25.73 657965.07 5976105.85 499.64S 6481.92W 26.74 63.11 657980.09 5976067.90 532.51S 6462.82W 23.56 100.02 657999.91 5976035.47 556.99S 6444.03W 18.43 130.68 658019.23 5976011.41 582.11S 6419.92W 20.22 165.51 658043.89 5975986.82 12046.29 91.76 124.43 8966.11 12088.31 92.2~ 116.17 8964.66 12121.94 89.35 !08.61 8964.22 12167.91 87.65 98.41 8965.35 12212.14 87.45 90.68 8967.15 607.23S 6388.42W 20.64 205.45 658075.93 5975962.41 628..40S 6352.i9W 19.67 245.85 658112.61 5975942.04 641.19S 6321.12W 24.07 276.63 658143.95 5975929.93 651.92S 6276.50W 22.39 315.34 658188.80 5975920.19 655.42S 6232.48W 17.49 348.44 658232.88 5975917.66 12249.11 88.7- 83.30 8968.37 12297.99 90.8~ 72.40 8968.52 12335.74 92.65 66.51 8967.35 12356.34 91.49 62.73 8966.61 12388.36 90.52 58.16 8966.04 653.48S 6195.61W 20.27 372.66 658269.70 5975920.42 643.20S 6147.90W 22.71 398.41 658317.17 5975931.73 629.97S 6!12.58W 16.28 413.42 658352.18 5975945.74 621.!5S 6093.98W 19.18 420.00 658370.58 5975954.97 605.36S 6066.!4W 14.58 427.98 658398.06 5975971.3~ 12420.58 91.22 55.00 8965.52 12469.74 91.93 41.46 8964.12 12515.16 93.69 51.10 8961.89 12547.79 90.71 55.87 8960.64 12579.81 88.77 60.42 8960.78 587.62S 6039.26W 10.11 433.89 658424.55 5975989.69 554.96S 6002.69W 27.56 435.80 658460.38 5976023.14 523.64S 5969.95W 21.55 436.02 658492.43 5976055.17 504.25S 5943.75W 17.23 440.27 658518.19 5976075.13 487.36S 5916.56W 15.45 447.00 658545.00 5976092.62 12614.79 90.34 67.79 8961.06 12647.89 90.31 75.03 8960.87 12679.66 89.41 82.09 8960.95 12702.58 88.~2 86.10 8961.46 12731.01 85.55 92.61 8962.98 472.098 5885.12W 21.54 457.86 658576.10 5976108.57 461.55S 5853.77W 21.87 472.06 658607.21 5976119.80 455.25S 5822.65W 22.40 489.14 658638.18 5976126.78 452.89S 5799.86W 18.51 503.28 658660.91 5976129.64 452.57S 577i.49W 24.10 522.76 658689.26 5976130.59 12780.00 85.55 92.61 8966.53 454.80S 5722.68W 0.00 558.26 658738.11 5976129.44 All data in feet "~niess otherwise stated. Calcula[icn uses minimum curvature method. Coordinates from E-10 and ~.~ss from ~ - MSL = 60.Blt. Bottom hole distance is 5740.72 on azamu%h 2~5.46 degrees from wellhead. Vertical secBion ~s from tie au S 2!3.0~ W 627~.01 on azlmu5h 136.00 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and ccmpu~el using ~he Clarke - 1866 s~heroli Presen%ed by Baker Hughes B.P. Exploration Pad E,E-10A Prudhoe Bay,North Slope, Alaska MD TVDss Rect~c-_~-uiar Coords. 11400.00 8784.00 213.96S 6276.01W 12780.00 8966.53 454.f0S 5722.68W SURVEY LISTING Page 2 Your ref : E-10A Last revised : 3-Jun-1999 Comments in wellpath Comment Tie on Projected to TD NO Targets associated with this we!!path Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_ WOA E Pad, Slot E-lO E-IOA Job No. AKMWg0122, Surveyed: 24 May, 1999 SURVEY REPORT ORIGINAL 8 June, 1999 Your Reft API-500292062301 Surface Coordinates: 5976710.89 N, 664448.86 E (70° 20' 33.6324" N, Kelly Bushing: 60.53ft above Mean Sea Level 148° 39' 55.0205" W) [I R I L L I N I~ S I~ R V ! C ~ '~ Survey Ref: svy8599 A ItAI.LIBUI~TON CO/~IPAN~' Sperry-Sun Drilling Services Survey Report for E-IOA Your Ref: API-500292062301 Job No. AKMW90122, Surveyed: 24 May, 1999 Prudhoe Bay Unit Measured Depth (ft) Incl. 114oo.oo 114o5.oo 1144o,93 1147o.92 11494.92 11548.4o 11582.38 11620,70 11652.17 11683.02 11694.67 11718.60 11757.99 11789.o6 11818.26 11861.29 119o2.19 11940.24 11971.11 12005.96 12046.29 12088.31 12121.94 12167.91 12212.14 35.270 35.200 39.110 46.640 49.530 57.640 60.650 64.770 69.960 74.180 75.940 78.930 82.880 85,340 86.750 87.100 89.300 89.560 89.660 90.700 91.760 92,200 89.300 87.890 87,450 Azim. 278.71o 278.71o 272,57o 267.45o 263.350 254.21 o 245.91o 232.340 223.020 212.83o 208,780 2oo.17o 188.22o 181,OLO 175.91o 165.OLO 154.29o 145.33o 139.64o 132.67o 124.41o 116.15o lO8.59o 98.390 90.660 Sub-Sea Depth (ft) 8783.97 8788.06 8816.70 8838.67 8854.70 8886.46 8903.91 8921.54 8933.67 8943.19 8946.20 8951.41 8957.66 8960.85 8962.86 8965.18 8966.47 8966.85 8967.06 8966.95 8966.08 8964.63 8964.19 8965.32 8967.12 Vertical Depth (ft) 8844.50 8848.59 8877.23 8899.20 8915.23 8946.99 8964.44 8982.07 8994.20 9O03.72 9O06.73 9011.94 9018.19 9021.38 9023.39 9025.71 9027.00 9027.38 9027.59 9027.48 9026.61 9025.16 9024.72 9025.85 9027.65 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 213.06 S 6276.01W 5976360.21N 658179.04 E 212.62 S 6278.86W 5976360.58 N 658176.18 E 210.54 S 6300.43W 5976362.19 N 658154.57 E 210.61S 6320.81W 5976361,68 N 658134.20 E 212.05 S 6338.60W 5976359.84 N 658116.44 E 220.58 S 6380.67W 5976350.39 N 658074.57 E 230.54 S 6408,04W 5976339,83 N 658047.42 E 248.02 S 6437.12W 5976321.72 N 658018.73 E 267.58 S 6458.53W 5976301.70 N 657997.75 E 290.71S 6476.52W 5976278.18 N 657980.28 E 300.37 S 6482.28W 5976268.39 N 657974.73 E 321.61S 6491.93W 5976246.94 N 657965.55 E 359.25 S 6501.43W 5976209.11 N 657956.88 E 390,03 S 6503,91W 5976178.28 N 657955.07 E 419.14 S 6503.13W 5976149.20 N 657956.50 E 461.45 S 6496.02W 5976107.05 N 657964.53 E 499.72 S 6481.82W 5976069.10 N 657979.57 E 532.57 S 6462.70W 5976036.68 N 657999.40 E 557.05 S 6443.91W 5976012.62 N 658018.72 E 582.16 S 6419.79W 5975988.04 N 658043.39 E 607.26 S 6388.28W 5975963.63 N 658075.44 E 628,42 S 6352.05W 5975943.28 N 658112.13 E 641.21S 6320.97W 5975931.18 N 658143.48 E 651.92 S 6276.35W 5975921.45 N 658188.33 E 655.40 S 6232.32W 5975918.93 N 658232.41 E Alaska State Plane Zone 4 PBU_WOA E Pad Dogleg Rate (°/100ft) Vertical Section (ft) Comment 1.4oo 14.988 27.649 17.5o6 20.449 22.754 33.23o 31.9o8 34.262 36.828 37.269 31.583 24.4Ol 18.o8o 25,308 26,742 23,557 18.435 20,221 20.644 19,673 24.o73 22.392 17.491 6273.o8 6275.89 6297.23 6317.55 6335.40 6378.Ol 6406.09 6436.47 6459.37 6479.13 6485.64 6496.96 6509.42 6514.33 6515.87 6512.14 65Ol.O3 6484.59 6467.80 6445.75 6416.33 6381.9o 6351.94 63o8.31 6264.70 TIE ON SURVEY WINDOW POINT Continued... 8 June, 1999 - 10:26 - 2 - DrillQuest Sperry-Sun Drilling Services Survey Report for E-IOA Your Ref: API-500292062301 Job No. AKMW90122, Surveyed: 24 May, 1999 Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 12249.11 88.770 83.280 8968.34 9028.87 653.45 S 6195.45W 5975921.69 N 658269.24 E 12297.99 90.880 72.380 8968.49 9029.02 643.16 S 6147.75W 5975933.03 N 658316.70 E 12335.74 92.650 66.490 8967.32 9027.85 629.91 S 6112.44W 5975947.04 N 658351.72 E 12356.34 91.490 62.710 8966.58 9027.11 621.08 S 6093.84W 5975956.28 N 658370.11E 12388.36 90.530 58.140 8966.01 9026.54 605.29 S 6066.01W 5975972.68 N 658397.59 E 12420.58 91.320 54.980 8965.49 9026.02 587.53 S 6039.13W 5975991.02 N 658424.08 E 12469.74 91.930 41.440 8964.09 9024.62 554.86 S 6002.57W 5976024.48 N 658459.91 E 12515.16 93.690 52.340 8961.86 9022.39 523.91 S 5969.51W 5976056.16 N 658492.28 E 12547.79 90.710 56.980 8960.61 9021.14 505.06 S 5942.92W 5976075.59 N 658518.45 E 12579.81 88.770 60.400 8960.75 9021.28 488.42 S 5915.57W 5976092.82 N 658545.43 E 12614.79 90.340 67.600 8961.03 9021.56 473.10 S 5884.15W 5976108.83 N 658576.50 E 12647.89 90.310 75.020 8960.84 9021.37 462.50 S 5852.82W 5976120.11 N 658607.60 E 12679.66 89.410 82.070 8960.91 9021.44 456.19 S 5821.70W 5976127.10 N 658638.57 E 12702.58 88.020 86.080 8961.43 9021.96 453.83 S 5798.92W 5976129.96 N 658661.30 E 12731.01 85.850 92.590 8962.95 9023.48 453.50 $ 5770.55W 5976130.92 N 658689.65 E 12784.00 85.850 92.590 8966.79 9027.32 455.88 S 5717.75W 5976129.69 N 658742.49 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 27.727° (24-May-99) The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well Reference and calculated along an Azimuth of 265.441 ° (True). Based upon Minimum Curvature type calculations, ata Measured Depth of 12784.00ft., The Bottom Hole Displacement is 5735.89ft., in the Direction of 265.441° (True). Alaska State Plane Zone 4 PBU_WOA E Pad Dogleg Rate (°ll00ft) Vertical Section (ft) Comment 20.268 22.712 16.284 19.182 14.581 lO.108 27.559 24.280 16.890 12.279 21.066 22.417 22.371 18.512 24.105 0.000 6227.79 6179.42 6143.16 6123.93 6094.92 6066.72 6027.68 5992.26 5964.26 5935.67 5903.14 5871.06 5839.54 5816.64 5788.33 5735.89 PROJECTED SURVEY Continued... 8 June, 1999 - 10:26 - 3 - DrillQuest Sperry-Sun Drilling Services Survey Report for E-IOA Your Ref: API-500292062301 Job No. AKMW90122, Surveyed: 24 May, 1999 Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_WOA E Pad Comments Measured Depth (ft) 114O0.00 11405.00 12784.00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 8844.50 213.06 S 6276.01 W 8848.59 212.62 S 6278.86 W 9027.32 455.88 S 5717.75 W Comment TIE ON SURVEY WINDOW POINT PROJECTED SURVEY 8 June, 1999 - 10:26 - 4 - DrillQuest ,SENT BY: BP' EXPLORAT I ON PE TREE: 6" CIW WELLHEAD: FMC ,12-99 ; 17:81 ; BPX PROD '~J E -10a Cement P&A -.._t ACTUATOR: AXEL$ON I.~. UUZ ~07 564 5193;# 7/11 i BF. ELEV = ~,86' ~ FOC--' 13-3/8" 72# L-80 .TRS t 2733' I- KOP: 1600 /MAX AN~,L,E: ,.",,° 0 7200' 4-1/2" $S$V LANDING NIPPLi= (CAMC0)(3,813" ID) F 2082'l GAS LIFT M)~NDRELS I~AI~I~ W/RI( .AT~H~ · __ N~-- MD(BKa) 'i'VDea 2 3146' 3000' 1 6008' 4-1/2" 12,6# L-BO TDS TUBING TUBING ID: 3,958" CAPACITY: O.01522 BBC/IT PERFORATION SUMMARy REF, LOG: BHOS 4-7-81 INTERVAL D 11,5'12 . 1 ~,b--76' ZD/12-14-89 ~KED/PUT BEHIN[ STRADDLE 11,800 - 11,628' 11,628 · 11,648' 11,610 ' 11,648' OPEN/4-18-92 TO. OF 7" ,-,NE. ! 10.340' i 4-1/2" SLIDING SLEEVE (O~S 'XA')O."13" ,D) I 1 ,W.="'""~ 7" PERM PKR W/ANCHOR (B^KEn 's~ (4.00. ,~) 11,574' ~ 4.1/2" "XN" NIPPLE 4-1/2" TBG TAIL (OTIS WLEG) 11,586' (ELMD) 11,599' 4-1/2" SWS NIPPLE (~q.813" ID) SEAL ASSEMBLY (4,00" ID) g-5/8" RET PACKER (BAKER 'HB') (4.~0" ID) I-lO'19s'i o,24S'1 1 lng Punch 11,263' - 11,267' ~ ;e~- ~.f I[.ur~.~3' Iron Bridge Plug Top @ 11,474' · , Abandonment cement to be downsqueezed through the 4 1/2" x 7" annulus Perf$11,570' - 11,574' PBTD 7" 2e# L-~ ,JaS 11,800' TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 May 17, 1999 Ted Stagg CT Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit E-10A BP Exploration (Alaska) Inc. Permit No: 9945 Sur Loc: 353'SNL, 500"vVEL, Sec. 06, T11N, R14E, UM Btmhole Loc. 1058'SNL, 1442'WEL, Sec. 01. T11N. RI3E, UM Dear Mr. Stagg: Enclosed is the approved application for permit to redrill the above referenced well. The permit to rcdrill docs not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Robert N. Christcnson, P. E. Chairman BY ORDER OF THE COMMISSION dlffEnclosurcs CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o cncl. STATE OF ALASKA " ALASKA ~..,_ AND GAS CONSERVATION COiVh~.,,ISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] Deepen []Service [] Development Gas []Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 60.53' AMSL Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 208280 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 353' SNL, 500' WEL, SEC. 06, T11N, R14E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 592' SNL, 1670' WEL, SEC. 01, T11N, R13E, UM E-10A At total depth 9. Approximate spud date Amount $200,000.00 1058' SNL, 1442' WEL, SEC. 01, T11N, R13E, UM 05/19/99 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028277, 1058' MDI No Close Approach 17 2560 12687' MD / 8965' TVDss 16. To be completed for deviated wells ! . Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 11447' MD Maximum Hole Angle 90° Maximum surface 3300 psig, At total depth (-FVD) 8800' / 4390 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 3-3/4" 2-7/8" 6.16# L-80 ST-L 1687' 11000' 8528' 12687' 8965' 112 cu ft Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: truemeasuredvertical 118009179 feetfeet Plugs(measured) 0 R 161NA L Effective depth: measured 11694 feet Junk (measured) Fill at 11694' (08/89) true vertical 9088 feet Casing Length Size Cemented M D TVD Structural Conductor 110' 20"x 30" 8 cu yds concrete 110' 110' Surface 2705' 13-3/8" 4185 cu ft Arcticset II 2733' 2698' Intermediate 10819' 9-5/8" 1565 cu ft Class 'G', 130 cu ft AS I 10847' 8411' Production Liner 1460' 7" 480 cu ft Class 'G' 10340' - 11800' 8031' - 9179' Perforation depth: measured 11610' - 11648' I ;,~,¥ Sqzd: 11512'- 11576' ~ - ~._., .." I00~ true vertical subsea 8950' - 8990' Alaska Oil & Gas Cnn._,, 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] I~"l[i~ram [] Drilling Fluid Program []Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Ted Stagg, 564-4694 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that t-',~_f°~°~-~.~e and c°rrect t° the best °f mY kn°wledgesigned ..... Ted Stagg ~ _~.-"j...-'"~ Title CT' Drilling Engineer Date / / Commission Use Only Permit Number I AP, N,,mbe, I Approvg, I Dat. Le~. I See cover 'otter ~;;:~-- ~/,.~" 50-029-20623-01 ,,_~-% / ~ - ~""~/ for other requirements Conditions of Approval: Samples Required []Yes '~No Mud Log Required []Yes ,,']~'No ~H.y.~rogej~ Sulf,~cle Measures ,~Yes [] No Directional Survey Required ",:~Yes [] No '~~OPE []2K; []3K; ~4K; []5K; []10K; []15K by order of Approved By Commissioner the commission Date Form 10-401 Rev. 12-01-85 Submit In Triplicate BPX E-10a Sidetrack Summary of Operations: E-10 is currently shut in due to declining productivity. The sidetrack, E-10a, will target Zone 1 reserves immediately above the HOT. This sidetrack will be conducted in two phases. Phase 1: Downsqueeze abandonment cement, set whipstock anchor: Planned for 7114199. · Squeeze holes will be punched in the 4 %" straddle at approx. 11,565'. A bridge plug will be set at approx. 11,500'. Tubing will be pressure tested prior to shooting squeeze holes at 11,300'. · Existing perorations will be abandoned with approx. 30 bbls cement. Abandonment cement will be downsqueezed through squeeze holes at 11,300' thereby stabilizing the 4 %" straddle and cementing off existing perorations. Abandonment cement will be pressure tested to 1500 psi with AOGCC witness. · A mechanical whipstock anchor will then be set on e-line at approx. 11,447'. Phase 2: Install Whipstock Tray, Mill Window and Drill Directional Hole: Planned for 7119199. Directional drilling coil tubing equipment will be rigged up and utilized to install the whipstock tray, mill the window through two strings (4 ½"x 7") and drill the directional hole as per attached plan. Mud Program: - Phase 1: Seawater - Phase 2: FIo-Pro (8.8 - 8.9 ppg) Disposal: - No annular injection on this well. - All drilling and completion fluids and other Class II wastes will go to CC-2a for injection. - All Class 1 wastes will go to Pad 3 for disposal. Casing Program: - 2 7/8", 6.16#, L-80, ST-L liner will be run from TD to approx. 11,000' MD and cemented with approx. 20 bbls. to bring cement 200 ft above the window. The well will then be perforated with coil tubing conveyed guns. Well Control: - BOP diagram is attached. - Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 4000 psi. - The annular preventer will be tested to 400 psi and 2000 psi. Directional - See attachments. - Kick Off: 11,447' MD (8,823' TVD ss) - TD: 12,687' MD (8,965' TVD ss) - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging - A Gamma Ray log will be run over all of the open hole section. Anchorage E-lO Vertical Section 85O0 855O 8600 8650 87OO 8750 88OO 885O 89OO 895O 9OOO 9O5O 9100 Path Distance (Feet) 0 500 1,000 1,500 2,000 TSAD Straddle completion 4.5" x 7" KOP above sliding sleeve thru two str ngs 2,500 3,000 ss@ 11479 WLEG @ 11599 Angle @ K.O.= 35 deg MD:11447 ~ ' ' TZ1B Tot ~:8172;; ft Marker Depths @Orig Wellbore TZ3 I 8,6311ffmVD TZ2C [ 8,691Irt-I-VD TZ1B [ 8,9231ftTVD TSAD I 8,5191ftTVD Kick Off 8,823 ft TVD 11,447Jft MD Deprtr @KO 6,321 ft MD KO Pt 1 1240[ MD New Hole 1,447 I Total MD 12,687 TVD TD 8,965 DLS degll00 Tool Face Length Curve 1 6 0 30 Curve 2 30 -50 272 Curve 3 30 -90 439 Curve 4 10 90 499 1,240 Drawn: 5/7/99 12:18 Plan Name: Case 101a -7,000 -6,500 E-lO -6,000 8,965 X distance from Sfc Loc -5,500 0 : -5,Ooo -5OO -1,000 -1,5O0 Well Name E-10 I CLOSURE Distance 5,869 ft Az 262 deg NEW HOLE E/W (X) N/S (Y) Kick Off -6,296 -347 TD -5,810 -830 State Plane 658,639 5,975,880 Surface Loc 664,449 5,976,710 DLS deg/100 Tool Face Length Curve I 6 0 30 Curve 2 30 -50 272 Curve 3 30 -90 439 Curve 4 10 90 499 1,240 Drawn: 5/7/99 12:18 Plan Name: Case 101a TREE: 6" C~W -10a Proposed Completion KB. ELEV = 60.53' WELLHEAD: FMC _ ..... BF. ELEV: 32.36' ACTUATOR: AXELSON 4-1/2" SSSV LANDING NIPPLE I 2082'1 FOC-- [~ O I (CAMCO)(3.813" ID) 13.-3/8" 72# L-80 BTRS I 2733' -- ~ k GAS LIFT MANDRELS (C. AIdIC. O WI RK I ATP. H/ ~ i i N° MD(BKB) i TVDss KOP: 1600 MAX ANGLE: 52° @ 7200' 1 ~ 6008' 5000' 4-1/2" 12.6# L-80 TDS TUBING ~.¢. ;~[ ~ ? ~ TUBING ID: 3.958" CAPACITY: 0.01522 BBL/FT !:~!/~' ~ ~i;~? PERFORATION SUMMARY ~ 0ii & ~a$ 00,~$~ ;'~ '~ REF. LOG: BHCS 4-7-81 SIZE ~PF INTERVAL ( PEN/SQZ'D 2 7/8" 8 11,512 - 11,576' SQZD/12-14-89 4-1/2" SWS NIPPLE I 10,1 PER --S LE,~KED/PUT BEHIN ) STRADDLE I I _ (PARKER) (3.813" ID) 3 1/8" 4 11,600 - 11,628' SQZD/4-11-92 ( ' I .... 11,628- 11,648' SQZD/4-11-92 ~ PBR SEAL ASSEMBLY 1 0,245' 33'8" 4 11,610-11,648' OPEN/4-18-92 X X 9-5/8"(BAKER)RET(4'00"PACKERID) J 1 0,268' ~_~ (BAKER 'HB') (4.00" ID) TOP OF 7" LINER 1 0, 40'1 ® ,/' m 4-1/2' SLIDING SLEEVE (OTIS 'XA')(3.813" ID)11,479' l~iiiiili ~iI (5,,-1/4" OD, 4-1/2" IDS) 7 PERM PKR W/ANCHOR i!ii?i iiiii Abandonment cement to (BAKER 'SAB') (4.00" ID) 11,574' ~ ¢'???: ii!;iiiiiii¢ii¢iii~ g be downsqueezed through 4-1/2 .... XN" NIPPLE~ ::::::?:?:?:?;::: ;;X; the 4 1/2" 7" annulus / 4-1/2" TBG TAIL -, :.::i!!iii!i!i!iii!iiiii:j :i X j:: (OTIS WLEG) 1 1,588' (ELMD) 1 1,599' PBTD 1 1,7~8' 7" 26# b-80 IJ4S 1 1,800'i -- GAS LIFT MANDRELS (C. AIdIC. C) WI ~K I ATC. H/ N° MD(BKB) TVDss -- . z dl4b' UUUU' 1 6008' 5000' =-10A CT Drilling & Completion BOP 22.5" $8" 2 3/8" CT ---~ 110,000 psil 7 1/16" Annular  Blind/Shear ~ 7 1/16" Pipe/Slip ~ 2 3/8" J~ I~ 1/'16:'; 51~0(; ;si'1 I1.._I i,__1 t__lI [~1~ r--I r--Iir--I ]~I ~I~I[ 1 17 1/16" x 5,000 psi ~ I Slips ,i = 2 7/8" I 7 1/16" _... ,, ,,: ,,, SWAB OR MASTER VALVE O0150290[ VENDOR ALASKAST 14 O0 DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET 032699 CK032699C 100. O0 100_ O0 HANDLINQ INST- S/H TERRI HUBBLE X4628 T.,= ^.AC.,=D C.'=CK ,S ,..^'~i~.~ FO. m:-s D,=SC.,m=D ^.OV,=. ~l~ll~_,~ll ~ O0. o0 OO. OD I- 'J "Y' ::'",:. N, ATiON',~'~IT~;B~NK 'i' .i .....: !' '?::',,,:,,?."OJ~EVELAND, OHIO ,,,',, ,:', l' .... ': ::;"'i i 6; "?'..: ':., '" ', .;::;; ';,: i': :". :; :'::,: 412 PAY ,:,:': :'?::i',:",:"::' ',':i,',,,,: :,::?::' ':,':i,'? ::::::::::::::::::::::::::: DATE ::::::'!:::i'::::' ..... ::::: I ' 03/2'6/'¢9 WELL PERMIT CHECKLIST COMPANY WELL NAME/~_.~_~ L'~"--,~3,,"~,'~ PROGRAM: exp~ FIELD & POOL INIT CLASS .~,Z.," /-~? ADMINISTRATION 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING APPR~ DATE 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to ~OeO psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. GEOL AREA Y N GEOLOGY APPR DATE, ANNULAR DISPOSAL APPR DATE 30. 31. 32. 33. 34. 35. With proper cementing records~his plan (A) will contain waste in a s,,~able receiving zone; ~ ....... (B) will not contaminat~eshwater; or cause ~ waste... to surface; ~ ~ (C) will not imp~mechanical integrity of~e well used for disposal; (D) will not,dafnage producing formati?d or impair recovery from a pool; and ~' (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. dev ~ redrll '~ serv~ wellbore seg ~ ann. disposal para req ~ UNIT# ////~"',_5"'(::~ ON/OFF SHORE (:~N (~N N Permit can be issued w/o hydrogen sulfide measures ..... YY ~~'/"~[ YY N _/ 7~ Data presented on potential overpressure zones ....... Y N Seismic analysis of shallow gas zones .............. Seabed condition survey (if off-shore) ............. ,,; Contact name/phone for weekly progress reports [exploratoryo~Y N Y N Y N Y N Y N Y N GEOLOGY: ENGINEERING: UIC~nular BE~ / WM ~ JDH ~ COMMISSION: co co Comments/Instructions: c:\msoffice\wordian\diana\checklist Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Tue Aug 31 15:49:34 1999 Reel Header Service name ............. LISTPE Date ..................... 99/08/31 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 99/08/31 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: MWD RUN 1 AK-MW- 90122 B. JAHN SEVCIK/PARKE REC ¥ED 14 1999 Al kttOi! &Gas s,C n E-10A 500292062301 BP EXPLORATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 31-AUG-99 MWD RUN 2 MWD RUN 3 AK-MW-90122 AK-MW-90122 B. JAHN B. JA_HN SEVCIK/PARKE SEVCIK/PARKE 6 llN 14E 353 500 60.50 .00 .00 WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 13.375 2733.0 9.625 10847.0 7.000 11405.0 3.750 12784.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 1 THROUGH 3 ARE DIRECTIONAL WITH SCINILLATION TYPE GAMMA RAY (NGP). 3. MWD DATA HAS BEEN DEPTH SHIFTED/CORRECTED USING MCNL WL-GR LOGGED ON 25 MAY, 1999 AND PROVIDED BY SCHLUMBERGER. NO WL-GR KBE ELEVATION PROVIDED. 4. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12784'MD, 8967'SSTVD. SROP = SMOOTHED RATE OF PENETP~ATION WHILE DRILLING. SGRD = SMOOTHED GAMMA HAY. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/31 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 11402.0 12754.5 ROP 11429.5 12783.5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 11402 0 11416 11417 11419 11460 11461 11465 GR 11401.0 11415 0 11417 5 11420 5 11458 5 11462 5 11467 0 EQUIVALENT UNSHIFTED DEPTH 11517 11521 11523 11524 11526 11567 11571 11574 11576 11595 11598 11619 11622 11625 11627 11629 11630 11633 11640 11645 11650 11655 11657 11669 11670 11703 11705 11706 11708 11710 11731 11732 11734 11736 11739 11742 11744 11746 11748 11749 11760 11770 11772 11776 11782 11875 11880 12029 12036 12039 12041 12044 12056 12059 12783 $ 11516 5 11520 0 11522 0 11524 0 11526 0 11566 0 11569 5 11572 5 11576 5 11595 5 11599 0 11619 0 11621 5 11624 5 11627 0 11628 5 11630 0 11632 0 11640 0 11645 0 11650 0 11655 0 11657 0 11668 5 11670 0 11703 0 11706 0 11707 0 11708 0 11711 0 11731 0 11733 0 11735 0 11737 5 11740 0 11743 0 11745 5 11747 0 11748 5 11751 5 11760 5 11770 5 11775 0 11778 5 11783 5 11877 5 11883 0 12029 5 12037.0 12040 5 12042 0 12045 5 12057 5 12060 0 12784 0 MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD $ REMARKS: BIT RUN NO MERGE TOP MERGE BASE 1 11430.0 11517.0 2 11517.0 11770.0 3 11770.0 12784.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11402 12783.5 12092.8 2764 11402 ROP 4.59 417.37 125.231 2709 11429.5 GR 10.36 145.81 50.892 2706 11402 Last Reading 12783.5 12783.5 12754.5 First Reading For Entire File .......... 11402 Last Reading For Entire File ........... 12783.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/31 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/31 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NI/MBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11401.0 11487.0 ROP 11430.0 11516.5 $ LOG HEADER DATA DATE LOGGED: 22-MAY-99 SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 35.2 MAXIMUM ANGLE: 49.5 INSITE 4.02 PCG 7.72, TPCD 1.03c MEMORY 11517.0 11430.0 11517.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER T-PCG 42 - BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 3.750 3.8 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLOPRO 8.70 .0 9.0 29000 6.4 .000 .000 .000 .000 145.9 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 1 API 4 1 68 4 2 ROP MWD 1 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11401 11516.5 11458.8 232 11401 GR 10.36 135.12 21.592 173 11401 ROP 4.59 134.78 58.2578 174 11430 Last Reading 11516.5 11487 11516.5 First Reading For Entire File .......... 11401 Last Reading For Entire File ........... 11516.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/31 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/31 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEkDER FILE NI3MBER: 3 PJtW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11488.5 11741.0 ROP 11517.0 11770.0 $ LOG HEADER DATA DATE LOGGED: 23-MAY-99 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 49.5 MAXIMUM ANGLE: 78.9 INSITE 4.02 PCG 7.72,' TPCD 1.03c MEMORY 11770.0 11517.0 11770.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER T-PCG 42 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 3.750 3.8 BOREHOLE CONDITIONS MUD TYPE: MIID DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPER3tTURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLOPRO 8.70 .0 9.6 28000 6.4 .000 .000 .000 .000 149.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 API 4 1 68 4 2 ROP MWD 2 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11488.5 11770 11629.2 564 11488.5 GR 18.98 145.81 38.0977 506 11488.5 ROP 5.12 146.23 92.5984 507 11517 Last Reading 11770 11741 11770 First Reading For Entire File .......... 11488.5 Last Reading For Entire File ........... 11770 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/31 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/31 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 P_AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11743.0 12755.0 ROP 11770.5 12784.0 $ LOG HEADER DATA DATE LOGGED: 2R-MAY-99 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 85.3 MAXIMUM ANGLE: 92.7 INSITE 4.02 PCG 7.72, TPCD 1.03c MEMORY 12784.0 11770.0 12784.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL N-UMBER T-PCG 42 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 3.750 3.8 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLOPRO 8.70 .0 9.3 32000 5.8 .000 .000 .000 .000 160.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 3 API 4 1 68 4 2 ROP MWD 3 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11743 12784 12263.5 2083 11743 GR 26.45 126.38 56.7995 2025 11743 ROP 6.2 417.37 138.92 2028 11770.5 Last Reading 12784 12755 12784 First Reading For Entire File .......... 11743 Last Reading For Entire File ........... 12784 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/08/31 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 99/08/31 Origin ................... STS Tape Name ................ UNKI~OWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 99/08/31 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Physical EOF End Of LIS File