Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout199-069 .~ . Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. I 99 - t:fß 9 File Number of Well History File PAGES TO DELETE Complete RESCAN o Color items - Pages: o Grayscale, halftones, pictures, graphs, charts - Pages: o Poor Quality Original - Pages: o Other - Pages: DIGITAL DATA o Diskettes, No. o Other, NolType OVERSIZED o Logs of various kinds o Other COMMENTS: Scanned by: Beverly Mildred Daretha ~well Date: ~/ 7 Isl M o TO RE-SCAN Notes: Re-Scanned by: Beverly Mildred Daretha Nathan Lowell Date: 151 RECE\VED AUG 2 7 2004 . ·on AlA!t\c.a Oi\ & Gas Cons comm1SSI 1b. Well Class~nchOrage II Development 0 Exploratory o Stratigraphic 0 Service 12. Permit to Drill Number 1~069 304-271 13. API Number 50-02~22525-01-00 14. Well Name and Number: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: 0 Oil 0 Gas 0 Plugged II Abandoned 0 Suspended 0 WAG 20AAC25.105 20AAC25.110 Zero Other 5. Date Comp., Susp., or Aband. 7/27/2004 - 6. Date Spudded 8/16/99 o GINJ 0 WINJ 0 WDSPL 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 919' SNL, 227' WEL, SEC. 33, T11N, R14E, UM Top of Productive Horizon: 2556' NSL, 340' WEL, SEC. 28, T11 N, R,14E, UM Total Depth: J}¡1~ 3620' NSL, 528' EWL, SEC~T11 N, R14E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 675967 y- 5949997 Zone- ASP4 TPI: x- 675766 y- 5953472 Zone- ASP4 Total Depth: x- 676606 y- 5954556 Zone- ASP4 18. Directional Survey 0 Yes II No No. of Completions 7. Date T.D. Reached 8/26/99 8. KB Elevation (ft): 61.85' 9. Plug Back Depth (MD+ TVD) 11660 + 8986 10. Total Depth (MD+TVD) 11694 + 8983 11. Depth where SSSV set N/A MD 19. Water depth, if offshore 1 N/A MSq PBU 07-32A 15. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool Ft Ft 16. Property Designation: ADL 028309 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) 21. Logs Run: MWD & MEM GR / CNL ~2. ~ CASING, LINER AND CEMENTING RECO. ri.i ...,}'1:'i22r'i·~:]'œ ~OM"FOP ø: .~\, ./? >/ 20" 91.5# H-40 31' 112' 31' 112' 30" 260 sx Arctic Set (Approx.) 10-3/4" 45.5# NT-80 34' 3286' 34' 3281' 13-1/2" 1050 sx CS 11I,375 sx Class 'G' 7-5/8" 29.7# NT-95HS/13C18O 31' 9653' 31' 8738' 9-7/8" 785 sx Class 'G' 2-7/8" 6.16# L-80 9554' 11694' 8658' 8983' 3.8" 123 sx Class 'G' 23. Perforations open to Production (MD + TVD of T 0,£ and Bottom Interval, Size and Number; if none, state none"): None MD TVD MD 26. Date First Production: Not on Production Date of Test Hours Tested 24. . SIZE 4-1/2", 12.6#, L-80 TVD AMOUNT PULLED TUBING RECORD DEPTH SET (MD) 9640' PACKER SET (MD) 9584' ,~·iii,..~" ........"... DEPTH INTERVAl (MD) AMOUNT & KIND OF MATERIAL USED 9540' Set CIBP (Failed) 9490' Set Cement Retainer 9480' P&A with 60 Bbls Class 'G', Sqzd to 1000 psi 9430' Set Whipstock OR\G\NAl Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE GAs-McF WATER-BBL PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A PRODUCTION FOR OIL-BBL TEST PERIOD ... Flow Tubing Casing Pressure CALCULATED ... OIL-BBL Press. 24-HoUR RATE GAs-McF WATER-BBL CHOKE SIZE I GAS-OIL RATIO OIL GRAVITY-API (CORR) CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". ¡!k..~~~ . ~,.. .-. .... None ¡ ",.'. , ¡ .2·2.7.0f ~._~D l____.·.· . 27. J (() r "" RBDIIS Bfl SEP· .U ~ 200~ 28. GEOLOGIC MARKERS 29. FORMATION TESTS MD Include and briefly summarize test results. List intervals tested, NAME TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag River 9258' 8419' None Shublik 9300' 8453' Sadlerochit 9371' 8511' Zone 28 9737' 8800' Zone 2A 9883' 8894' Zone 1 B 10100' 8968' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble Title Technical Assistant Date PBU 07-32A Well Number 199-069 304-271 Prepared By NamelNumber: Drilling Engineer: Terrie Hubble, 564-4628 Sean McLaughlin, 564-4623 roval No. INSTRUCTIONS GENERAl: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Permit No. 1 ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only Well: Field: API: Permit: 07 -32B Prudhoe Bay Unit 50-029-22525-02-00 204-128 Accept: Spud: Release: Rig: 07/26/04 07/29/04 08/04/04 Nordic #1 ..__·_·v·....Vyw··· PRE-RIG WORK 07/17/04 SET C-SUB @ 9528' SLM. PULLED DGL V FROM ST A. 3, LEFT POCKET EMPTY. PULLED EMPTY C-SUB. DRIFTED WI 3.70" X 21' LONG DUMMY WHIPSTOCK TO 9533'SLM (TOP OF 27/8" LINER). 07/18/04 PULLED TOOLS OOH, RIGGED DOWN. TURNED WELL OVER TO DSO, LEFT SHUT IN. 07/20/04 SET CAST IRON BRIDGE PLUG AT 9540'. DEPTH CORRECTED TO SLB MEMORY CNL LOG DATED 27-AUG- 1999. CIBP SUPPLIED BY BAKER, MODEL K1 FOR 4.5" TUBING. Page 1 __ BP EXPLORATION o perati ohs Summäry Report .. .... .... ....... Legal Well Name: 07-328 Common Well Name: 07-328 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To Hours Task Code NPT Phase -----.. 7/26/2004 00:00 - 01 :30 1.50 MOB P PRE 01 :30 - 01 :45 0.25 MOB P PRE 01 :45 - 10:00 8.25 MOB P PRE 10:00 - 10:15 0.25 MOB P PRE ¡ 10:15 -11:00 0.75 MOB Ip PRE 11 :00 - 13:30 2.50 BOPSUF P PRE 13:30 - 18:00 4.50 BOPSUF P PRE 18:00 - 19:00 1.00 BOPSUF P PRE 19:00 - 20:30 1.50 BOPSUF P PRE 20:30 - 21 :45 I 1.25 ZONISO I P 2.25 ZONISO P WEXIT WEXIT 21 :45 - 00:00 7/27/2004 WEXIT 00:00 - 02:30 2.50 ZONISO P Start: 7/26/2004 Rig Release: 8/412004 Rig Number: N1 Spud Date: 11/28/1994 End: 8/4/2004 Description of Operations ..______ __.____0__.__. _ .___ Move Nordic 1 off of K-05C well and clean up location. Fold up Herculite for re-use on next well, for summer rig maintenance. SAFETY MEETING. Review procedure, hazards and mitigation for rig move with security, tool service, Nordic and SWS personnel. Move rig to DS 07-32B via West side water road to oxbow road to DS 07. 13 mile derrick up rig move. Move went very well. SAFETY MEETING. Review procedure, hazards and mitigation for backing rig over well. Position Herculite around well, for summer rig maintenance work. Well is secured, all valves clossed. Well is dead. Back rig over well and center over tree. RIG ACCEPT at 11 :00 hrs 7/26/04. Nipple up BOPE. General rig up. Spot tanks and trailers. R/U berm and Tiger tank, M/U hard line and pressure test. Perform initial BOPE pressure and function tests. AOGCC test witness waived by Jeff Jones. Send test report to AOGCC. Grease chains and check packoff on injector head. RU and pump dart for coil volume. - Dart on seat at 58.7 bbls. RD dart catcher. Test inner reel valve to 3500 psi. Off Critical Path: - Open SSSV. - Install fusable cap. PJSM. MU Weatherford cement retainer BHA. RIH with cement retainer. - PU 43.5k at 9515' MD. - Tag CIBP at 9537' MD. Correct CTMD 3' to 9540' MD. - PU to 9480' MD. . RBIH to 9490' MD setting depth. - Drop 1/2' steel ball. - Displace 1/2' ball with KCI water at 2 bpm, taking retums to the tiger tank. - Pump pressure increased to 2400 psi, at 24 bbls. Bled off pressure. - Pump again. Pump pressure and coil tubing pressure increased to 4100 psi. - Bled off pressure. Blew down all surface lines to ensure all lines were clear. - At this point we have pumped 24 bbls away, ball is still in the reel. - Must be junk in the ball seat. [Most likely cause with small ball seat]. - Pressure up to 2500 psi and hold for 5 minutes. - Stage up pressure to 4000 psi, seeing slight bleed off. - Stage up pressure to 4400 psi, pumping 0.25 bpm to Printed: 8/9/2004 9:40: 11 AM ':>, Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date BP EXPLORATION Operations Summary Repog 07-328 07-328 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 7/27/2004 00:00 - 02:30 From- To Hours Ta.sk Cöde NPT Phase WEXIT 02:30 - 04:30 04:30 - 05:00 05:00 - 06:00 06:00 - 07:00 07:00 - os:oo 2.50 ZONISO P 2.00 ZONISO N DFAL WEXIT 0.50 ZONISO N DFAL WEXIT 1.00 ZONISO N 1.00 ZONISO N DFAL WEXIT DFAL WEXIT 1.00 ZONISO N DFAL WEXIT OS:oo - 09:00 1.00 ZONISO N DFAL WEXIT 09:00 - 10:00 1.00 ZONISO N DFAL WEXIT 10:00 - 1 0: 15 0.25 ZONISO N DFAL WEXIT 10:15 -11:00 0.75 ZONISO N DFAL WEXIT 11 :00 - 13:00 2.00 ZONISO N DFAL WEXIT 13:00 - 14:00 1.00 ZONISO N DFAL WEXIT 14:00 - 14:50 0.S3 ZONISO N DFAL WEXIT Page 2" Start: 7/26/2004 Rig Release: 8/4/2004 Rig Number: N1 Spud Date: 11/28/1994 End: 8/4/2004 Desoription of Operations maintain pressure. - Pressure dumped to zero, getting minimal returns. - Slack off to ensure packer was set. Stacked weight. - Stage up pumps to 2 bpm and 600 psi. - No retums at surface; therefore rupture disk in tact. - No pressure in IA; therefore fluid not turning the corner out the GLM. - Pumped total of 23 bbls away. - Checked bleed valve on IA. - Gas at surface for approx 30 see then stabilized. - PU out of cement retainer to 9470' MD (41 k PU). Did not see the 4000 Ib overpull required to sheer pins. - Slack off. Tag cement retainer at 9490' MD. - Pumped at 2 bpm with no returns and no pressure on IA. - Unsting again with full returns. - Discuss with Anchorage on way forward. - Release cementers. See Remarks for addtional information. POOH with cement retainer setting tool at 1 bpm and 60 - 100 fpm. Stand back injector. LD running tool. - Rupture disk intact. Install tree cap. Wait on pumping unit. Press test 4-1/2' tubing against Cement retainer. Held 1000 psi. Steady 30 min. Little Red pumping KCL water down 4-1/2" x 7-5/8" IA. 1 bpm, 300 psi 2 bpm, 350 psi, 4bpm, 400 psi, 5 bpm, 900 psi, Pump away 100 bbl KCL. 4 bpm, SOO psi, Pump away 65 bbl diesel. Stop pump. IA went on strong Vacuum. RID little red. Determine forward procedure using larger cement volume to get squeeze pressure and then place cement up IA behind 4-1/2' tubing. Wait on WF cementing stinger BHA. SAFETY MEETING. Review procedure, hazards and mitigation for M/U of WF cementing BHA. M/U WF cementing BHA. OAL = 49.16'. RIH with Cement retainer stinger assembly. Pump 57 bbl diesel down 4-1/2" x 7-5/S' IA. SI press = 30 psi. A total of 122 bbls diesel in lA, = 4650 ft diesel. Stop at 9320 ft and circ at 0.5 bpm, full returns, 50 psi. Wait on SWS Cement UCA test to pump cement. Circ. at 1 bpm, 250 psi, full returns with stinger at 9320'. IA = 50 psi. Up wt = 43K, down wt = 23.5K Cement retainer at 9490'. Open GLM #3 at 9516' Printed: 819/2004 9:40: 11 AM BP EXPLORATION Page 3'- Operfltions Summary Report ... Legal Well Name: 07 -328 Common Well Name: 07-328 Spud Date: 11/28/1994 Event Name: REENTER+COMPLETE Start: 7/26/2004 End: 8/4/2004 Contractor Name: NORDIC CALISTA Rig Release: 8/4/2004 Rig Name: NORDIC 1 Rig Number: N1 Da.te From - To Hours Task Code NPT Phase Description of Operations 7/27/2004 14:00 - 14:50 0.83 ZONISO N DFAL WEXIT CIBP at 9540'. RIH and sting into cement retainer at 9494', circ at 0.5 bpm. Lost returns when stung into retainer as normal, coil went on a vacuum. Stack 5K on retainer. IA = 90 psi. Press up CTx4-1/2' tubing ann to 360 psi. Good test. Steady press. Pump 2 bpm down coil. 700 psi, IA = 165 psi, WHP = 355 psi. Pump 3 bpm, 1700 psi, IA = 390 psi, WHP = 370 psi. Pump 3.5 bpm, 2700 psi, IA 570 psi, WHP = 370 psi. 3.5 bpm to formation with 520 psi increase in lAP shut in press. Stop pump. IA fell to 240 psi, circ press to 0 psi. Bleed off WHP to zero. 14:50 - 15:00 0.17 ZONISO N DFAL WEXIT Sting out of cement retainer with stinger. 43K up wt. No overpull. Circ at 1 bpm, full returns, 15:00 - 16:30 1.50 ZONISO N DFAL WEXIT Circ at 0.4 bpm, full returns while waiting on SWS UCA cement test. Get OK to pump cement. 16:30 - 16:45 0.25 ZONISO N DFAL WEXIT SAFETY MEETING. Review procedure, hazards and mitigation for pumping cement. 16:45 - 17:20 0.58 ZONISO N DFAL WEXIT Circ. while batch up cement. Cement at weight at 17:00 hrs. Press test cement line to 4300 psi. Sting into cement retainer. Set down 5K on retainer. Pressure CT X 4-1/2' annulus with 315 psi. holding steady. 17:20 - 19:10 1.83 ZONISO P WEXIT Stage 5 bbl fresh water. Stage 60 bbl, 15.8 ppg, G neat cement. Stage 30 bbl, 2# Biozan water Stage 30 bbl, KCL water. Take 20 bbls diesel returns to little red pump truck up IA. Got 1000 psi increase in squeeze pressure after cement reached formation Sqz press started at 13 bbls out stinger. Sqz'd 4 bbl to formation. Laid in 20 bbls cement up 4-1/2 x 7-5/8· annulus. Stop displacement at 36 bbls. Leaving 23 bbls cement in coil. POH at 78 fpm while pumping cement out of coil. Pull to safety of 5700'. (See attached job data). 19:10 - 20:10 1.00 ZONISO P WEXIT Open choke, circ 30 bbl Biozan out stinger and contaminate cement while RIH. Cleanout cement in 4-1/2' tubing to 9480'. Pump second 30 bbl Biozan pill to contaminate cement. Circ. KCL water to chase cement to surface. 20:10 - 20:20 0.17 ZONISO P WEXIT Jet up to 9400' (- above W/S setting depth). RBIH & jet to 9480' with bio-pill. 20:20 - 22:30 2.17 ZONISO P WEXIT POOH jetting uphole chasing contaminated cement OOH & washing tbg profiles @ 2.9bpm. 22:30 - 23:00 0.50 ZONISO P WEXIT OOH. UD Cement retainer stinger BHA. 23:00 - 23:30 0.50 ZONISO P WEXIT M/U swizzle stick & jet BOP stack. UO swizzle stick & SIB injector. Flush choke manifold lines. Meanwhile R/U SLB Eline unit. 23:30 - 23:45 0.25 WHIP P WEXIT PJSM for P/U & RIH whipstock & setting tool on E-Line. Printed: 819/2004 9:40: 11 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: BP EXPLORATION Operations Summáry Report Page4~ . .- > 07-328 07-328 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 7/26/2004 Rig Release: 8/4/2004 Rig Number: N1 Spud Date: 11/28/1994 End: 8/4/2004 Date From - To Hours Task Code NPT - 7/27/2004 23:45 - 00:00 0.25 WHIP P 7/28/2004 00:00 - 02:00 2.00 WHIP P Phase Description of Operations ---- ------ ---.- -- 2.00 STWHIP P WEXIT RIU E-Line sheaves. Bleed off lAP from 1500psi to 30psi. WEXIT Insert 2 RA pip tags into whipstock. RA PIP tag to TOWS = 8.47'. Calibrate P~S tool & orient whipstock for lS setting. M/U SlB E-line swivel, P~S tool, CCl & Baker setting tool, wt bar & 4-1/2' monobore whipstock. CCl to TOWS = 18'. WS length = 12.47'. RIH with P~S, CCl, setting tool & whipstock BHA. RIH & lightly tag cmt retainer @ 9455' CCl-ElM. P/U wt = 39501bs. log up hole to 9250' CCl-ElM. Tie-into SWS MTNUGR/CCl log of 8/27/1999. RBIH to 9412' CCl-ElM. log back up to CCl depth of 9412' (TOWS @ 9430' ELM). Set W/S with good wt loss indication & tray orientation of 4degs lOlS. Tag W/S, log off & confirmed W/S setting depth. POOH Eline & W/S setting tools. UO SWS Eline tools & R/O SWS. Cut CT. Install Baker CTC & Pull test to 35k - OK. Pressure test to 4k - OK. SAFETY MEETING. Review procedure, hazards and mitigation for M/U BKR window milling BHA M/U BHA #3, 3.80' HC Window mill, string reamer and straight motor. OAl = 83.57'. RIH with BHA #3, window milling BHA. Circ at 0.5 bpm. 100 psi. Tag whipstock pinch point at 9434'. Correct to TOWS depth of 9,430'. Flag CT at 9430'. Milling 3.80' lowside window thru 4-1/2' X 7-5/8' dual strings. 2.6/2.6 bpm, 1800 psi, 2-4K WOB, Milled to 9432 ft. Milling, 2.6/2.6 bpm, 1800-2000 psi, 3-5K WOB, Milled to 9,433.4'. SWS UCA Cement sample at 2000 psi. Milling, 2.6/2.6 bpm, 1800-2070 psi, 3-5K WOB, Milled to 9,435'. Milling, 2.6/2.6 bpm, 1800-2100 psi, 4-6K WOB, No Stalls. Milled to 9,436.5' Milling, 2.6/2.6 bpm, 1800-2400 psi, 4-6K WOB, Milled to 9,437'. Back ream window, Clean pick up, Up wt = 38K, Own wt = 20.5K, Free spin press = 1650 psi. Ream back to bottom. No stalls yet. WEXIT Milling, 2.6/2.6 bpm, 1650-2400 psi, 4-6K WOB, Milled to 9,438'. Stall. P/U clean & ease back into milling. Up wt = 32k. Own wt = 20k. Freespin @ 1.6bpm = 2050psi. lAP = 70psi & OAP = 260psi. looks like we're out @ 9438.5'. WEXIT Mill formation to 9450' with 2.6/2.6bpm, 2050/2200psi, 10fph ave ROP & 1 k WOB. WEXIT Swap well bore to 8.6 ppg reconditioned flopro mud. Meanwhile backream/dress window/rat hole 3x & drift 2x. Window looks clean. Tentative window depths are: TOWSrrOW = 9430', RA PIP Tag = 9438.5'. BOW = 9438.5', BOWS = 9442.5'. WEXIT Paint EOP flag @ 9300' & POOH window milling BHA#3. 02:00 - 03:20 1.33 WHIP P WEXIT 03:20 - 03:35 0.25 WHIP P WEXIT 03:35 - 03:45 0.17 WHIP P WEXIT 03:45 - 05:00 1.25 WHIP P WEXIT 05:00 - 05:30 0.50 WHIP P WEXIT 05:30 - 06:00 0.50 STWHIP P WEXIT 06:00 - 06:15 0.25 STWHIP P WEXIT 06: 15 - 07:00 0.75 STWHIP P WEXIT 07:00 - 09:00 2.00 STWHIP P WEXIT 09:00 - 11 :00 2.00 STWHIP P WEXIT 11:00 -13:15 2.25 STWHIP P WEXIT 13:15 - 15:00 1.75 STWHIP P WEXIT 15:00 - 17:00 2.00 STWHIP P WEXIT 17:00 - 18:00 1.00 STWHIP P WEXIT 18:00 - 20:00 20:00 - 21 :30 21 :30 - ~2:50 22:50 - 00:00 1.50 STWHIP P 1.33 STWHIP P 1.17 STWHIP P Printed: 81912004 9:40: 11 AM Page 5'" BP EXPLORATION Operations Summary Report Continue POOH window milling BHA#3. PJSM. UD BHA#3 & inspect mills. DWM gauge 3.80· go 1 3.79" no-go & DSR gauge 3.80". Wear on window mill face indicates center crossed the tbg/csg walls. Line up & test wellbore/cement packer to 1500psi for 10mins as follows: Time WHP lAP OAP Onset 4 52 100 o 1500 140 201 3 1150 114 171 4 809 95 148 5 650 88 142 6 540 79 137 7 490 78 132 10 330 70 120 Held pre-spud safety meeting. Reviewed well plan, potential hazards & drilling BHA MIU procedures. Rehead & M/U OS CTC. Pull & pressure test. M/U build section BHA #4 with used HYC OS 100 3-3/4· x 4-1/4" bicenter bit, 1.69deg bend motor, MWD, orienter & MHA. M/U injector. RIH with BHA #4. SHT MWD & orienter - OK. Correct CTD by +4.3' @ the flag. RIH to 9390' for GR tie-in. Log down GR & tie-in into Geology PDC log - subtract 6' from CTD. RIH with pumps down & set down on window @ 9439'. P/U & check TF - @ 50L. Orient to 145R. RIH clean thru window without pumps. Tag btm @ 9451'. Check TF - @ 165L. Establish freespin @ 2.8bpm/3150psi. P/U wt = 38k, S/O wt = 27k. PVT = 295bbls. lAP = 50psi, OAP = 80psi. Commence driling buildlturn section. Drill to 9453' with 150L TF, 2.8/2.8bpm, 3150/3500psi, 3k WOB & 35fph ave ROP. DrillingZ4Buildsecton. 2.7/2.7bpm, 3100-4100 ',105L, 30 deg incl, 30 FPH, Drilled to 9450'. Drilling Z4 Build secton. 2.7/2.7 bpm, 23 deg incl, 30 FPH, Drilled to 9 Drilling Z4 Build secton. 2.7 . bpm, 3100-4100 psi, 90L, 24 deg incl, 20 FPH, . ed to 9566'. Drilling Z3 Build on. 2.7/2.7 bpm, 3100-4100 psi, 50L, 24 deg inc FPH, Drilled to 9568'. PO it. ssure test IA against cement packer. Initial pressure = 2920 psi, Pressure after 30 min. = 2850 psi. Good IA pressure test. Chart pressure test. C/O bit, MWD probe and adjust motor to 2.0 deg bend. RIH with build MWD BHA#5, with HC 3.75 x 4.125" Bit #3, 2.00 deg motor. Correct to CT flag at 9365.3 ft. [-5.2 ft] PROD1 Run thru window with 160R TF. RIH clean to TO. PROD1 Drill zone-3 to 9606' with 60-80L TF, 2.6I2.6bpm, 3050/3500psi, 3k WOB & 15fph ave ROP. P/U wt = 37k, S/O wt = 24k. PVT = 302bbls. Bleed down lAP to 70psi & OAP to 11 Opsi. PROD1 OrientTF around to 90R. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 07-328 07-328 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Date From .... To Hours Ta.sk Codé NPT Phase 7/29/2004 00:00 - 00:45 0.75 STWHIP P WEXIT 00:45 - 01 :30 0.75 STWHIP P WEXIT 01 :30 - 02:00 0.50 ZONISO P WEXIT 02:00 - 02:15 0.25 DRILL P PROD1 02:15 - 03:00 0.75 DRILL P PROD1 03:00 - 05:00 2.00 DRILL P PROD1 05:00 - 05:30 0.50 DRILL P PROD1 05:30 - 05:45 0.25 DRILL P PROD1 05:45 - 06:00 0.25 DRILL P PROD1 06:00 - 08:00 2.00 DRILL P PROD1 08:00 - 10:00 2.00 DRILL P PROD1 10:00 - 12:30 2.50 DRILL P PROD1 12:30' 13:15 0.75 DRILL P PROD1 13:15 - 15:00 1.75 DRILL P PROD1 15:00·15:45 15:45·17:30 0.75 DRILL 1.75 DRILL P P 0.50 DRILL P Start: 7/26/2004 Rig Release: 8/4/2004 Rig Number: N1 Spud Date: 11/28/1994 End: 8/4/2004 Description of Operations Printed: 8/9/2004 9:40: 11 AM W61\- 7/1'; 12-0C4 p J S 711 3, 19-- >n\\4 1 (' STATE OF ALASKA ( ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 20 AAC 25,280 1J " ~I o Other o Time Extension o Stimulate o Waiver o Re-Enter Suspended Wel a Plug Perforations o Perforate New Pool o Perforate o RepairWel o Alter Casing 0 Pull Tubing o Change Approved Program 0 Operation Shutdown Type of Request: a Abandon 1 Number Permit To Dri 199-069 / API Number: /' 50- 029-22525-01-00 5. [ Class: o Exploratory o Service Current 1m Development o Stratigraphic ,Wel 4. Operator Name: BP Exploration (Alaska) Inc. Address: P.O. Box 196612, KB Elevation (ft): 2. Alaska 99519-6612 61.85' Anchorage, 3. PBU 07-32A / Well Name and Number: 9. 7. ,.,,1,,1, ,'II,"" ,1..;" Junk (measured)' None / Prudhoe Bay Pool : ' I, I d' I :: ~ ~ ~: I ::! ¡, i ¡ ;;: i :::'::; I : ,: ,; i i: i :: :", i ,: : i :: ~: ,¡,' \ Plugs (rñëãšüred) None , , Pool( s) Prudhoe Bay Field , 1 / ADL 028309 1I"I,.I!;l,li.\I." ", ,,';.....',,::.,. .', !i~R~$i'~;r."w... ..WWÇ¢)N'O,q;'ºN:$ljMM~~¥: Total Depth TVD (ft): I Effective Depth MD (ft): Effective Depth TVD (ft) 8983 11660 8986 l;lefflgU1j,iilil :""'" ~ 10. Field 8. Property Designation (ft) I ,'I,: Depth MD 11694 ~ , 11 Total 470 2480 4790 1490 š21õ 6890 112' 3281' 8738' 112' 3286' 9653' 20" 10-3/4' 7-5/8" 81' 3252' 9622' Structural Conductor Surface Intermedia .Er2s;1udinn Liner 13890 13450 8983' 8658' 11694' 9554' 2-7/8' 2140' 2074' Tubing MD (ft) 9640' 9551' 9584' I Packers and SSSV MD (ft) Tubing Grade: L-80 Perforation Depth TVD (ft): 8868' - 8988' 4-1/2" 7-5/8" x 4-1/2" Baker 'SABL-3' packer; 4::¡œHES Perm a-Series packer; 4-1/2" Camco 'TRCF4A' TRSSSV Tubing Size: ,12.6# Perforation Depth MD (ft) 9834' - 11640' Packers and SSSV Type: / 1m Development 13. Well Class after proposed work: o Exploratory Attachments: 1m Description Summary of Proposal o Detailed Operations Program 12. o Service / rI Abandoned o WDSPL #qtf 564~ o Plugged DWINJ Well Status after proposed work: o Oil 0 Gas o WAG DGINJ 15. o BOP Sketch July 15, 2004 5ãtã: 14. Estimated Date for Commencing Operations: Sean McLaughlin, Prepared By NamelNumber Terrie Hubble, 564-4628 Contact Date "7 It 3 /6 i..I Verbal Approval Commission Representative: I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Sean McLaughlin Title CT Drilling Engineer ( tJ ~ .~ 4C?Gflf- ~.I\/" t~....~ 564-4623 I.' i,,::I:'::,'¡ 16. 17. Phone ~i~nat~re (", ';:.,:,,:! Jof-ë>7/ Sundry Number I Notify Commission so that a representative may witness Conditions of approval !+PPJíJued ÇoYW'- I -7 Approved Form 10-403 o Location Clearance df' tcu~. o Mechanical Integrity Test o BOP Test o Plug Integrity '7- 3-z ß 1, it 16a~ () (,tc12 { I ~r I.Ñ~' '¥\é' d ¡n. çt V'f-'l:) I 40 o Other: Date _8ft APPROVED BY THE COMMISSION COMMISSIONER ORIGINAL (' (' bp Winton Aubert Petroleum Engineer Alaska Oil & Gas Conservation Commission To: S,M, McLaughlin CTD Engineer From: July 08, 2004 Date sidetrack Well 7-32A is scheduled for a ~ough tubing sidetrack with the SLB/Nordic 1 Coiled Tubing Drilling rig on 7/24/04. The sidetrack, 7-32B, will exit...gat-.e-f the existing 4 Y2" liner and 7 5/8" casing off a wI:~l?_~toC..k-ÌJ} Zone 4 and target Zone 1 sands. The production packer is below the proposed kick off point so a,Ø'ément p,ª,ckér will . be pumped prior to the wellbore exit. There will be 430' of cement in the annulus above th~;"kic'1r"õff point. The r' existing perforations will be isolated by a CIBP and cement below the whipstock and liner cement above. The following describes work planned for the P&A and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. of the CTD P&A operations for well 07-32A as part Re: /' 5/5/04 to 9000' /' 3000psi Pre CTD Summar 1) 0 MIT-OA 2) 0 MIT -IA cmnplete, 3) 0 AC-LDS/POT; AC-PPPOT-IC; AC-PPPOT-T 4) S OGLV at sta,3; DGLV at sta.l&2 5) E Set CIPB in 2 7/8" tubing at 9560' /' ". 6) E Set cement retainer above bottom GL V at 9490' /' 7) C Sting into retainer and pump 15.8 ppg cement through bottom GL V 8) E Set whipstock oriented for a ~ 1&( I 6hlt;. k/6Jt passed wi is slated to begin on 7/15/04. The pre CTD work Sean McLaughlin CTD Drilling Engineer 564-4694 Well File Sondra Stewman/Terrie Hubble CC sA( NOTES: TRSSV LOCKED OUT. 9696' FOUND ROCKS AND ALLED WITH VIDEO (BEHIND CT LNR) 70° @ 9957' AND 90° @ 10432' 07 -32A ( **CANCELLED WAIVER. T X IA REPAIRED POST- GL V** FMC CrN BA KER C 61 .9' ~~~~~~ 97 @ 10561' ------------9827; ,.._~.._.---~~. 8800'SS \ TREE"" WB-LHEAD = ACTUÄTOR'; ....'""'''''''.."~~......................."....".y,,,., KB. aEV = BF. aEV = ,..............................""'.,·............w.,·.,.....W.W.'vN".... KOP= Max Angle = "õãtürrIMÕ-;"-' ~,"..._."",.~"....", '~~U"'-"~ Datum 1VD = 1 CAMCOTRCF4A TRSSSV.ID=3.813' 4-1/2' 2074' 1 <I> PORT t DATE 05/05/04 05/05/04 05/05/04 o o o GAS LIFT MANDRB-S ST MD TVD DE\! TYÆ VLV I LATCH 1 3925 3915 12 KBMGM DMY BK 2 7051 6613 34 KBMGM DMY BK 3 9516 8628 36 KBMGM DMY BK ~ Jj ~ 3286' Minimum ID = 2.34" @ 9551 4-1/2" PACKER CSG, 45.5#, NT-80, ID = 9.953" 10-3/4' [ f ~ ~ ]-1 9492' I 1-1 9492' I NT-95 HS, ID = 6.875' TOP OF 7-5/8" CSG,29.7#, L 7 _5/8' 1 ÆRMA-SERIES DEPLOYMENT SUB l X 2-7/8' l--r- 4-1/2" HALLIBURTON PKR W/3' OF SEALS 3-3/4" 3-1/2" 9551 9554'1-1 9558' 1 f H ~ r 9554' CSG CT [TOP OF 2-7/8" LNR- XOl 7-5/8" X 4-1/2" BAKER SABL-3l PKR (BEHIND CT LINER) 9584' ~ :8:J ] 1 HES X NIP (BEHIND CT LNR), ID = 3.813' (BEHIND CT LNR) ELMD TT LOGGED 01/22/95l TUBING TAIL W/WLEG 4-1/2' 4-1/2' 9618' 9640' 9640' 1 1 [ I I 7' 1 9640' 12.6#, L-80, .0152 bpf, ID = 3.958' TBG, [ 4-1/2' 1 r 9653' MILLOLJT WINDOW ~~ ~ )(X 11/26/02 07107/02 08/28/99 08/28/99 08/28/99 08/28/99 ANGLEATTOPÆRF: 51 @ 9834' Note: Refer to Production DB for historical perf data S~E I S~ INTERVAL Opn~qz DATE 2" 6 9834 - 9854 0 2" 6 10152 - 10202 0 2" 4 10660 - 10850 0 2" 4 10885 - 11105 0 2" 4 11130 - 11185 0 2' 4 11265 - 11640 0 ÆRFORA TION SUMMARY REF LOG: BHCA ON 12/12/94 )( 1 11660' ~ 2-7/8" LNR, 6.5#, L-80, .0058 bpf, ID = 2.441 r ... 10136' r L7-5/8" CSG, 47#, L-80, ID = 6.875' PRUDHOE BAY UNIT WELL: 07 -32A ÆRMrr No: 1990690 API No: 50-029-22525-01 SEC 33, T11 N, R14E, 4749.78' FEL & 1659.39' FNL BP Exploration (Alaska) DATE REV BY COMMENTS DATE REV BY COMMENTS 1994 ORIGINAL COM PLETION 02/11/03 Itlh WAIVER SAFETY NOTE 08/29/99 SIDETRACK (07-32A) 06/13/03 CMO/TLP KB ELE\! A TION CORRECTION 02/05/02 RN/TP CORRECTIONS 09/11/03 CMO/TLP ÆRF ANGLE CORRECTION 07107/02 JP/tlh ADD ÆRFS 11/21/03 KDClPA G WAIVER SAFETY NOTE 11/11/02 Bl'vVtlh WAIVER SAFETY NOTE 05/05/04 JLJ/KAK GL V ClO 11/26/02 JB/KAK ADD ÆRFS 06/02/04 T JP/KA K CANCEL WAIVER SAFETY NOTE f" ;TV NOTES: TRSSV LOCKED OUT, 9696'- Fv\JND ROCKS AND ALLED WITH VIDEO (BEHIND CT LNR) 70° @ 9957' AND 90° @ 10432', ··CANCELLED WAIVER T X IA REPAIRED POST- GL V·· 07-328 Proposed CTD Sidetrac TRé: = Frv1C WB..LHEAD = CrN 'ACïiiÄT6R;;; BA KER"C ·KB.-B..EV -;--~~9¡ iiF.·iiE\r;' ". ........, ., ...................? 'KOP = _..·.._.._--·~ã06-; ....~_........-........~..-.".~...-.... .. ~...."._.~....-....._....' .....~, Max Angle = 97 @ 10561' ....-..... --.." Datum MD = 9827' ---.-----.. ... -,....---- Datum 1VD = 8800' SS CAMCO TRCF4A TRSSSV. ID = 3.813 4-1/2" - GAS LlFf MANDRB..S DEV "TYPE VLV I LATCH I PORT DATE 12 KBMGM DMY BK 0 05/05/0~ 34 KBMGM DMY BK 0 05/05/0~ 36 KBMGM DMY BK 0 05/05/0' ST MD 1VD 1 3925 3915 2 7051 6613 3 9516 8628 CSG, 45.5#, NT-80, ID = 9.953' 10-3/4 " Cerner 3-1/2" Liner XN NIP, ID = 2.75' Top of 3-1/2' Packer Cerner Liner Top Annular 3<1116 x 2-7/8 X-over Mechanical Whipstock Retaine Cernent -1 11085' X 2-7/8" cmt'ed and perfed (open) CSG, 29.7#, NT-95 HS, ID = 6.875' I TOP OF 7-5/8" ÆRMA-SERIES 7-5/8" 3-3/4" DEPLOYMENT SUB 3-1/2" X 2-7/8" XO 7-5/8" X 4-1/2" BAKER SABL-3 PKR (BEHIND CT LINER) HES X NIP (BEHIND CT LNR), ID = 3.813' TOP OF 2-7/8" LNR CIBP 4-1/2" HALLIBURTON PKR W/3' OF SEALS ÆRFORA TION SUMMARY REF LOG: BHCA ON 12/12/94 ANGLE AT TOP PERF: 51 @ 9834' Note: Refer to Production DB for historical perf data SIZE I SPF INTERV AL Opn/Sqz DA TE 2" 6' 9834 - 9854 isolated 2" 6 10152 - 10202 isolated 2" 4 10660 - 10850 isolated 2" 4 10885 - 11105 isolated 2" 4 11130 - 11185 isolated 2" 4 11265 - 11640 isolated 4-1/2" TUBING TAIL W/WLEG (BEHIND CT LNR: B..MD TT LOGGED 01/22/95 9640' 12.6#, L-80, .0152 bpf, ID = 3.958" TBG, 4-1/2' 9653' MILLOUT WINDOW proposed proposed proposed proposed proposed propos ed CSG, 47#, L-80, ID = 6.875" 7-5/8" 2-7/8" LNR, 6.5#, L-80, .0058 bpf, ID = 2.441" PRUDHOE BAY UNIT WB..L: 07-32A PERMIT No: 1990690 API No: 50-029-22525-01 SEC33, T11N, R14E, 4749.78' FB.. & 1659.39' BP exploration (Alas ka) 11350' DATE REV BY COMMENTS DATE REV BY COMMENTS 1994 ORIGINAL COM PLETION 02/11/03 Itlh WAWER SAFEtY NOTE 08/29/99 SIDETRACK (07-32A) 06/13/03 CMOffiP KB B..EV A TION CORRECTION 02/05/02 RNlTP CORRECTIONS 09/11/03 CMOffiP PERF ANGLE CORRECTION 07/07/02 JP/tlh ADD PERFS 11/21/03 KDClPAG WAWER SAFEtY NOTE 11/11/02 BMltlh WAfVER SAFEtY NOTE 05/05/04 JLJ/KAK GL V C/O 11/26/02 JB/KAK ADD PERFS 06/02/04 TJP/KAK CANCB.. WAWER SAFETY NOTE 4.5" slotted Liner 12/31/03 Schlumbepger State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 NO. 3087 Company: Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Field: Prudhoe Bay Color Blueline Prints CD - - / ---:; 1 ..l;). Lt.<=; 5s1 - -r- - - - - 1 - - -r- - - - - T I 1 - - 1 - -- - - 1 - - - - - - - - - - - - - - - - - .-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Date 08/12/03 04/25/03 06/10/03 OS/28/03 QQ/20/97 Õ'.~ - - O¡'/",C"~7 -!. 11/22'::;' _. L Log Description PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 MCNL SCMT SCMT SCMT ÑñÑÕIGRTREPROCESSED) MWD GR MD MWD GR TVD MEM PPROF & IPROF RECEIVED Job# 10558569 10560252 10564482 10559786 40001315 40001315 40001315 10715362 Wel t') 0nU~ Ii ~L:_ løt 11"""~ '" ~ '.'~ ¡.:äS l..,om~,!,j(Jmm~JM;; ···~",I¡·"''''::2a..:o r ·:·..l~":."\~'r~ .01 ¡ '--. . . ~;;~~t,~~ {;~ Date Delivered ~~~,\~ ~ ~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Size Cemented Measured Depth True Vertical Depth 20" 260 sx Arcticset 149' 149' 10-3/4" 1050 sx CS III & 375 sx 3286' 3281' Class 'G' 7-5/8" 785 sx Class 'G' 9653' R E G6rŸ¿D 2-7/8" 25 bbls 15.6 ppg Class 9554' - 11660' 'G' DEC 1 9 2002 1. Operations performed: ADD PERFS 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 AnchoraQe, AK 99519-6612 4. Location of well at surface Operation shutdown_ Pull tubing _ 919' FNL, 227' FEL, Sec. 33, T11 N, R14E, UM At top of productive interval 2724' FNL, 340' FEL, Sec. 28, T11 N, R14E, UM At effective depth 1653'FNL,4794'FEL, Sec. 27, T11N, R14E, UM At total depth 1659' FNL, 4750' FEL, Sec. 27, T11N, R14E, UM 12. Present well condition summary Total depth: measured true vertical 11694 feet 8983 feet Effective depth: measured true vertical 11651 feet 8987 feet Casing Conductor Length 115' 3252' 9591' 2106' Surface Intermediate Production Stimulate _ Alter casing _ 5. Type of Well: Development _X Exploratory_ Stratigraphic_ Service (asp's 675967, 5949997) (asp's 675766, 5953471) (asp's 676564,5954561) (asp's 676606, 5954556) Plugs (measured) Junk (measured) Plugging _ Perforate _X Repair well _ Other 6. Datum elevation (DF or KB feet) RKB 62 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 07 -32A 9. Permit number / approval number 199-069 10. API number 50-029-22525-01 11. Field / Pool Prudhoe Bay Field I Prudhoe Bav Pool measured Open Perfs 98~'-9854', 10152'-10202', 10660'-10850', 1088à~i' "'~~~~~~gg~mmiSS¡On Open Perfs (continued) 11265'-11640' true vertical Open Perfs 8866'-8877',8984'-9000',9015'-9010', 9011'-9010', 9010'-9008', 9007'-8988' Perforation depth: Tubing (size, grade, and measured depth) 4-1/2" 12.6# L-80 @ 9640' MD. Packers & SSSV (type & measured depth) 7·5/8" x 4-1/2" Baker SABL-3 Packer @ 9584'. 4-1/2" HES Perma-Series Packer @ 9551'. 4-1/2" Camco TRCF4A TRSSSV (Locked Out) @ 2074'. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. ReDresentative Dailv Averaoe Production or Iniection Data Oil-Bbl Gas-Met Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 11/24/2002 236 5370 55 302 Subsequent to operation 12/10/2002 15. Attachments Copies of Logs and Surveys run _ Daily Report of Well Operations Oil X Gas 17. I hereby certify that the fOregOing; tje and correct to the best of my knowledge. A~~ ~~ Title: TechnicalAssistant DeWavne R. Schnorr 1185 Form 10-404 Rev 06115/88 . 13941 16. Status of well classification as: 4 799 Suspended Service Date December 12. 2002 Prepared bv DeWavna R. Schnorr 564·5174'" ~. ~. ~ SUBMIT IN DUPLICATE ~, ~ 07 -32A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 11/20/2002 PERFORATING: DRIFT/TAG 11/26/2002 PERFORATING: PERFORATING 12/10/2002 TESTEVENT --- BOPD: 1,185, BWPD: 4, MCFPD: 13,941, AL Rate: 0 EVENT SUMMARY 11/20/02 DRIFTED TBG W/2" DUMMY GUN, TO 9894' WLM, DEVIATION. BOTTOM SHOT @ 9854' = 40' OF RAT HOLE. 11/26/02 PERFORATED INTERVAL 9834'-9854' USING 20' GUN, 2" HSD, POWERJET CHARGES PJ 2006 HMX, 6 SPF, 60 DEG PHASING. DEPTH CORRELATED TO MCNL LOG DATED 27-AUG-2002. API ENTRANCE HOLE = 0.2", PENETRATION = 18.6", EXPLOSIVE LOAD = 6.5 G. «< WELL LEFT SHUT-IN, CALL DSO TO POP »> 12/10/02 TESTEVENT --- BOPD: 1,185, BWPD: 4, MCFPD: 13,941, AL Rate: 0 Fluids Pumped BBLS 3 PRESSURE TEST SURFACE PRESSURE CONTROL EQUIPMENT WITH DIESEL 3 TOTAL ADD PERFS 11/26/2002 THE FOLLOWING INTERVAL WAS PERFORATED USING THE 2" HSD PJ 2006, 6-SPF,60 DEGREE PHASING, RANDOM ORIENTATION. 9834' - 9854' Page 1 lRæ= WELLHEill.D= AClUATOR= 1<8. ELEV = SF. ELEV = KOP= Wlax Angle = !>atum WI) = D..tum lVD= ~ FWJ; CIW BAKER C 62' ? 3806' 97 @ 1Q581' QS27' 8800' 5S 11 )'314' CSG. 45.5#. NT-SO, 10 = Q-'l53" 328ti' ~ Minimum ID = 2,34"@ 9551- 4-112" PACKER 7-5tr1' CSG.2~.7#. NT-!il5 HS.IO= 6.875" H TOP OF 7-518" CSG H 9492' 9492' I ITOPOF2-718"LNR- CT 9554' I 14112" TBG.12.6#, L-&J. 0.0152 bpt.ID =3.Q5ei' DATE 1994 C8129199 02113101 0:2106102 D7107102 11111102 9640' m ÆRFORA TION SUWM4.RY R8' LOG: BHCA ON 12/12/94 ANGLE AT TOP PERF: 46 @9S34 Note: Refer to PrDdutltion DB tOt historical perf data SIZE SPF IN 'lERVAL Opn/Sqz DA'IE Z" tI !ilS34 - !il854 0 11/26102 Z" tI 10152 - 10202 0 07107102 2' 4 10660 - 10850 0 OBI2S199 Z" 4 1OS95 - 11105 0 OBI2S¡gg Z" 4 11130 . 11165 0 08128199 2" 4 1126ð - 11640 0 08128/Q9 7-6M' CSG. 47'!11. LSO. ID= 6.S75" H 10136' I REV BY COMWENTS OR.IGINAL COt./PLETION SIDETRACKED FINAL CORRECTIONS ADD PERFS WAJI(ER SAFElY NO'IE 07 -32A . I L - ::::::::: <:":> 0:;....;:0 ¡, DA TE REV BY cowens 11120A:l2 JelKAK ADD PERFS SI$. MD RNfTP JI'I'tIh SMtih <II ¡g IH ¡g I ~õ ~ ~ ~ SAFer Y NOTES: T RSSV LOCKED OlJ '. 9696' - FOUND ROCKS AND FILLED WITH VIDEO (BEHIND CT LNR) 70"@ 9957' AND 9O"@ 10432'. '''T X IA COMM OPERATING PRESSURE OF THE 13-318" ANNUL us MUST NOT EXCEED 2000 PSI (111OSI02 W AIV BW" 2<174' 4112" CAWl:O TRCF 4A lRSSSV. 10 = 3.813" ~ GAS LIFT M6.NDR8...S ST MD lVD DEV 1YÆ VLIJ LATCH PORT DATE 1 3925 3915 12 I<8MGM 81<5 2 7051 6613 34 I<8MGM BI<5 3 9516 Bð28 36 I<8M()M 81<5 9551' I- 4112" HALLIBURTON PERMt.-SERES I PKR WI3' OF SEALS 3-314" DEPLOYMENT SUB 1 3-112" X2-71S' XO I 9554' - 9558" - 9584' 7-5If1' X 41/Z' BAKER SABL-3 I PKR(BEHND CTLINER} 9618" 4112" HBS X NIP{BEHIND CT LNR). ID = 3.813" I 9640' I 964(1' 4112" TUBING TAILWIWLEG (BEHIND CTLNR) I HELM!> TT LOßGED 01122/00 I tJlLLOUT WINDOW: 0053' I I 2-7tr1' LNR- CT, 6.5#. L-BO. .OO57Q bpt.1D =2.441" 11660' I PRUDHOE SAY UNIT WB...L: 07-32A PERMIT No: 1990BQO API No: 5().029- 22525-01 see 33, T11N. R1~ 4749.78' FEL& 165Q.3Q' FNL BP Exploration (Alaska) r STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: ADD PERFS 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchoraqe, AK 99519-6612 4. Location of well at surface Operation shutdown_ Pull tubing _ Stimulate _ Alter casing _ 5. Type of Well: Development _X Exploratory_ Stratigraphie_ Serviee_ 919'FNL,227'FEL,Sec.33, T11N, R14E, UM At top of productive interval 2724'FNL,340'FEL,Sec.28, T11N, R14E, UM At effective depth 1653'FNL,4794'FEL,Sec.27,T11N, R14E, UM At total depth 1659'FNL,4750'FEL,Sec.27, T11N, R14E, UM 12. Present well condition summary Total depth: measured true vertical (asp's 675967,5949997) (asp's 675766, 5953471) (asp's 676564, 5954561) (asp's 676606,5954556) Plugging _ Perforate _X Repair well _ Other 6. Datum elevation (DF or KB feet) RKB 62 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 07 -32A 9. Permit number / approval number 199-069 10. API number 50-029-22525-01 11. Field / Pool Prudhoe Bay Field / Prudhoe Bay Pool 11 694 feet 8983 feet Plugs (measured) Tagged PBTD @ 11651' (12/21/2000) Effective depth: measured 11651 feet Junk (measured) true vertical 8987 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 115' 20" 260 sx Arcticset 149' 149' Surface 3252' 10-3/4" 1050 sx CS 111,375 sx 3286' 3281' Class 'G' Intermediate 9591' 7-5/8" 785 sx Class 'G' 9653' 8738' Liner 2106' 2-7/8" 140 cf Class 'G' 9554' - 11660' 8658' - 8986' Perforation depth: measured Open Perfs 10152'-10202',10660'-10850', 10885'-11105', 11130'-11185', 11265'-11640' true vertical Open Perfs 8984'-9000', 9015'-9010', 9011'-9010', 9010'-9008', 9007'-8988' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80, TBG @ 9584' MD; 4-1/2", 12.6#, L-80, Tubing Tail @ 9640' MD. Packers & SSSV (type & measured depth) 7-5/8" x 4-1/2" Halliburton Perma-Series PKR w/ 3' of seals @ 9551'., , 7-5/8" x 4-1/2" Baker 'SABL-3' PKR @ 9584'. 4-1/2" Camco TRCF4Å,TFiSSSV ~ 2074'" MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. ReDresentative Dailv Averaae Production or Iniection 'Dàta Oil-Bbl Gas-Met Water-Bbl 40 0 0 Prior to well operation 07/04/2002 -:- . ,¡ "'J"I. :: Casing Pressure Tubing Pressure 826 41 o 16. Status of well classification as: o 818 Subsequent to operation 07/24/2002 15. Attachments Copies of Logs and Surveys run_ Daily Report of Well Operations Oil X Gas ::;4;¿;~orrect to the best ::I:YT:::~:~::jSœnl DeWavne R. Schnorr Form 10-404 Rev 06/15/88 · Suspended Service Date SeDtember 06.2002 Prepared by DeWavne R. Schnorr 564-5174 $Ç~NED SEP 1 2 2002 ~ SUBMIT IN DUPLICATE '\ I'- 07-32A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 06/15/2002 PERFORATING: DRIFT/TAG 07/06/2002 PERFORATING: PERFORATING 07/07/2002 PERFORATING: PERFORATING EVENT SUMMARY 06/15/02 DRIFT 2.0" D-GUN TO 9893' SLM NOTE ---------> APPEARED TO BE CHASING AN OBSTRUCTION DOWN HOLE BEGINNING AT 96401 SLM (LNR TOP @ 9554' MD, 70 DEGREES AT 9957' MD). «< LEFT WELL SHUT IN »> 07/06/02 MIRU DS CTU #3. WELL FLOWING, RIH WITH MEM CCUGR AND LOGGED FROM 10400' - 100001 (PAINTED FLAG @ 102501). POOH. RIH WITH GUN #1 (25' --- SWS 2" PJ 2006 HMX, 6.5 GM, 6 SPF, 60 DEG) AND SHOOT INTERVAL 10177' TO 10202'. POOH. 07/07/02 POOH WITH GUN #1. RIH WITH GUN #2 (251 --- SWS 2" PJ 2006 HMX, 6.5 GM, 6 SPF, 60 DEG) AND SHOOT INTERVAL 101521 TO 10177'. POOH. RD DS CTU #8. WELL IS ON PRODUCTION. «< ADD PERF SUMMARY: 101521 TO 102021 @ 6 SPF »> JOB COMPLETED. Fluids Pumped BBLS 0 PRESSURE TEST SURFACE PRESSURE CONTROL EQUIPMENT WITH DIESEL ( NO TESTS) 89 50/50 METHANOL WATER 89 TOTAL ADD PERFS 07/06-07/2002 THE FOLLOWING INTERVAL WAS PERFORATED USING THE 2" PJ 2006 6 SPF, 60 DEGREE PHASING, RANDOM ORIENTATION. 101521 - 102021 SCANNED SEP 12 2002 Page 1 199-069-0 PRUDHOE BAY UNIT 07-32A 50- 029-22525-01 BP EXPLORATION (ALASKA) INC Roll #1: Start: Stop Roll #2: Start Stop MD 11_694 TVD 08983 ~/Completion Date: ~9 Completed Status: I-OIL Current: T Name C 9385'// o 9591~ o 9592 v.---- L GR-MD ~ L GR-MD L--//" L GR-TVD L- L GR-TVD v/ L MCNL ¿// R SRVY LSTNG L--- / -' R SRVY LSTNG C,,' j,it \ '- ! r ~. -- ---- ---- Wednesday, June 20, 2001 Interval Sent Received SCHLUM MCNL CH 10/22/99 11/4/99 FINAL BHI GR PBl OH 8/1 0/00 8/16/00 FINAL BHI GR OH 8/1 0/00 8/16/00 FINAL 9799-11688 OH 2/5 8/1 0/00 8/16/00 FINAL 9652-10129 PB 1 OH 2/5 8/1 0/00 8/16/00 FINAL 8669-8968 OH 2/5 8/1 0/00 8/16/00 FINAL 8676-8964 PB 1 OH 2/5 8/1 0/00 8/16/00 FINAL 9241-11661 8/27/99 CH 2 10/22/99 11/4/99 BHI 9548-11694. OH 9/13/99 9/14/99 BHI 9548.-10129. PBl OB 9/13/99 9/14/99 T/C/D C Page 1 of 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Pull tubing _ Stimulate _X (Microbe) Alter casing _ 5. Type of Well: 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. o. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface Development _X Exploratory_ Stratigraphic_ Service_ 919' FNL, 227' FEL, Sec. 33, T11 N, R14E, UM At top of productive interval 2724' FNL, 340' FEL, SEC 28, T11 N, R14E, UM At effective depth (asp's 675967, 5949997) (asp's 675766,5953471) At total depth 1659' FNL, 4750' FEL, Sec. 27, T11 N, R14E, UM 12. Present well condition summary (asp's 676606, 5954556) Plugging _ Perforate Repair well_ Other 6. Datum elevation (DF or KB feet) RKB 62 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 07 -32A 9. Permit number / approval number 1 99-069 10. API number 50-029-22525-01 11. Field / Pool Prudhoe Bay Oil Pool Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 115' Surface 3252' Production 9591 ' Liner 2140' 11694 feet 8983 feet Plugs (measured) Tagged PBTD @ 11651' MD on 12/21/2000. 11651 feet 8987 feet Junk (measured) Size Cemented Measured Depth 20" 260 Sx Arcticset 112' 10-3/4" 1050 Sx CS III & 375 Sx Class G 3286' 7-5/8" 785 Sx Class G 9653' 2-7/8" 25 bbls of 15.6 ppg Class G 11 694' True vertical Depth 112' 3281' 8738' 8983' F?Ec~~ /- e ,/ ~ jI/T"_ ñ vt::U MAR 0 AlaskaO¡f 1 2001 & Gas Cons C Anchorage' Ornn7isSioo Perforation depth: measured 10660'-10850'; 10885'-11105'; 11130'-11185'; 11265'-11640'. Packers & SSSV (type & measured depth) 7-5/8" X 4-1/2" BAKER SABL-3 PACKER @ 9584' MD; 4-1/2" HALLIBURTON PERMA-SERIES" PACKER @ 9551' MD. 4-1/2" CAMCO TRCF4A TRSSSV (LOCKED OUT) @ 2074' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Dailv Averaae Production or Iniection Data Oil-Bbl Gas-Met Water-Bbl -200 -3800 0 true vertical 9015' - 9010'; 9011' - 9010'; 9010' - 9008'; 9007' - 8988'. Tubing (size, grade, and measured depth) 4-1/2",12.6#, L-80 Tbg @ 9640' MD. Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run_ Daily Report of Well Operations X Oil X Gas 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. -200 -3800 16. Status of well classification as: Signed Bob Gerik ~ Title: OS 7 Surveillance Engineer ~ ! ..",....J \\J Form 10-404 Rev 06/15/88 · Casing Pressure Tubing Pressure -975 o -975 Suspended Service Date 2/28/2001 Prepared by Paul Raul 564-5799 SUBMIT IN DUPLICATE 07 -32A DESCRIPTION OF WORK COMPLETED MICROBE STIMULATION TREATMENT Date Event Summary 12/18/2000: RIH & drifted to 10275' SLM (HAW). 12/19/2000: Loaded IA wi 220 bbls of 60/40 Methanol Water. 12/21/2000 - Performed a Microbe Stimulation Treatment as follows: MIRU 24 hr CTU. PT'd equip. 12/22/2000: Loaded & killed well wi 200 bbls of 20/0 KCL Water. RIH wi CT & tagged PBTD @ 11651' MD. PUH to 10600' & performed injectivity test - 1.8 bpm @ 680 psi. Reciprocated a Microbe Fluid Treatment across the open perforation intervals located @: 10660' - 10850' MD (Zone 1 B) 10885' - 11105' MD (Zone 1 B) 11130' - 11185' MD (Zone 1 B) 11265' - 11640' MD (Zone 1 B) Pumped a total of 1200 bbls of Microbe / 20/0 KCL Solution. POOH wi CT. FP'd well to 2500'. Left top of Microbe mix @ -9500' MD. RD CTU. Left well shut in for minimum of 14 days for microbes to incubate. 2/10/2001: RIH & drifted to 9930 SLM (HAW). Placed well BOL. Since well is twinned wi 07-10, production test data was estimated. RËCEiV£D MAR 0 1 ZOO/ Alaska Oil & G as Cons. Co . AnChorage rnlìilSsion Page 1 ,., ( - (,S I I 1-;<::::, - ::), S I '"¿'2.. - 14l"'} I~(,y ,\ \ 1'<:<,(.,-- \L -. 1 G\<1 - ()L;c¡ I '1 cl - I ?/6 1 0/22/99 Scblumberger NO. 12882 Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Cased Hole) Well Log Description BL Sepia CD Job # Date D.S.3-32A PRODUCTION PROFILE W/DEFT 991014 1 1 D.S.4-18 LEAK DETECTION LOG 991017 1 1 D.S. 6-24 LEAK DETECTION LOG 991015 1 1 D.S. 1-30 99343 CNTG t\ ·t-?j~,c·. 990804 1 1 1 D.S.1-34 99345 RST H '-~. r?.... L) Lf 990806 1 1 1 D.S. 7-32A 99351 MCNL -u Cf?: ßS 990827 1 1 1 D.S.11-34 99395 RST t:f. ?<?,':::; ~ 991013 1 1 1 1""'\ r'" r... ~ ~: ~l ur::r" .. SIGN~~)) " t::. ~ ,,1..-1 " æ..... I,.... DATE: t.}J 0 4\999 ~,.." U J Alas\æ 0\\ & Gas Cons. Commission Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. ~mP~~~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMiSSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG r"cö~T:~~[:~~:t~·_··f 919' FNL, 221' FEL, Sec. 33, T11 N, R14E, UM II' 0';\T~~; l.". At Top Producing Interval Q 2724' FNL, 340' FEL, SEC 28, T11 N, R14E, UM ¡ ~"':~7;-~¿~t AtTotal Depth ¡ .~'"_~ ~ 1659' FNL, 4751' FEL, SEC 27, T11N, R14E, UM ~_. p'-."' . 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. RKB 62 feet ADL 28309 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. August 16, 1999 August 26, 1999 September 12,1999 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey 11694' MD /8983' TVD 11660' MD 18986' TVD YES ~ No 0 1 . Status of well Oil ~ Gas 0 2. Name of Operator ARCO Alaska, Inc. 3. Address Suspended 0 P. O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 22. Type Electric or Other Logs Run MWD & MEM GR/CNL 23. CASING SIZE WT. PER FT. GRADE 20" 91.5# H-40 10-3/4 n 45.5# NT-80 7-5/8" 29.7# NT-95HS/13CR8 2-7/8" 6.16# L-80 Classification of Service Well Abandoned 0 Service 0 ~ 7. Permit Number 99-69 8. API Number 50-029-22525-01 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number 07-32A 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 15. Water Depth, if offshore 16. No. of Completions N/ A feet MSL 1 20. Depth where SSSV set @ 2075' feet MD 21. Thickness of Permafrost 1900' (approx) CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD TOP BOTTOM 31' 112' 34' 3286' 31' 9653' 9554' 11694' HOLE SIZE 30· 13-1/2" 9-7/8" 3.8" CEMENTING RECORD AMOUNT PULLED 260 Sx Arcticset 1050 Sx CS III & 375 Sx Class G 785 Sx Class G 25 bbls of 15.6 ppg Class G 24. Perforations open to Production (MD + TVD of Top and Bottom and interval, size and number) 09/04/1999"* 4.0 Test Period> Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF Press. -780 psi 24-Hour Rate> 883 26586 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips. 10660' - 10850' MD; 10885' - 111 05' M D; 11130' - 11185' MD; 11265' - 11640' MD; 9015' - 9010' TVD; 9011' - 9010' TVD; 9010' - 9008' TVD; 9001' - 8988' TVD; 27. Date First Production September 3, 1999 Date of Test Hours Tested 25. SIZE TUBING RECORD DEPTH SET (MD) 9640' PACKER SET (MD) 9585' 9529' (RCP) 4-1/2" @ 4 SPF @ 4 SPF @ 4 SPF @ 4 SPF 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED (See Sidetrack Summary for details) PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Flowing Production for OIL-BBL nR1G'~JA' WATER-BBL CHOKE SIZE'· GAS-OIL RATIO 30109 _ OIL GRAVITY - API (corr) \ \.1 t. V ...rç\'I Ð~~"'" \' .... . 0 '\ \~~~ ~.,_. SCa ~ _.~ . ~\. .._-~- ~rP- c.v.? (\\\ ~ ~~~~O(ò.~ \'>¡\? GAS-MCF WATER-BBL o * This 10-407 is submitted as directed per the 10-401 form approved July 19, 1999 (Permit #99-69) ** Production test was performed prior to liner top packer installation. Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. 30. GEOLOGIC MARKERS '- FORMATION TESTS NAME MEAS.DEPTH TRUE VERT. DEPTH Include interval tested, pressure data, all fluids recovered and gravity. GOR, and time of each phase. Top of Sag River Sand 9258' 8419' Top of Shublik 9300' 8453' Top of Sadlerochit 9371' 8511' Top of Zone 28 9737' 8800' Top of Zone 2A 9883' 8894' Top of Zone 1 B 10110' 8968' 31. LIST OF ATTACHMENTS Summary of 07-32A CT Sidetrack Drilling Operations + Survey. 32. I hereby certify that the following is true and correct to the best of my knowledge. Signed~/\!rMI\ .~ ' ~. Bruce E. Smith, P.E. 'ù,E 61"1'\í.<.th Title AAI Coil Tubina Drillina Supervisor Date 1/21/'11 Prepared by Paul Rauf 263-4990. INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Fonn 10-407 07 -32A DESCRIPTION OF WORK COMPLETED COILED TUBING SIDETRACK DRILLING OPERATIONS SUMMARY Date Event Summary 8/13/1999: Accepted CTU Rig @ 1800 hrs. 8/14/1999: MIRU CTU. 8/15/1999: Can't. to RU CTU. PT'd 80PE to 4000 psi. RIH & logged GR tie in. Tagged TOC @ 9629' MD. Milled pilot hole to 9675' & POOH. RIH & tagged 8TM. 8/16/1999: Time milled window f/9653' - 9660' in the 7-5/8" casing. Drilled FM to 9680'. POOH. 8/17/1999: RIH & dressed window interval. POOH. RIH & drilled to 9711 MD. Circulated new Flo Pro. Performed LOT to EMW of 9.2 ppg. Drilled to 9879' & POOH. 8/18/1999: RIH & drilled to 10064'. POOH. RIH & drilled to 10129'. POOH for plugback prep. 8/19/1999: RIH wi CT nozzle & tagged 8TM. Pumped 10.5 bbls of 17 ppg Class G Cement to plugback OH to 9400'. Contaminated Cement wi 8iozan & CIO to 9780'. POOH. WOC. RIH & tagged TOC @ 9800'. Dressed off top of Cement to 9810'. Time milled OH ST. 8/20/1999: Drilled ahead to 9930' & POOH. CT dent @ 2430'. Cut out damaged CT. 8/21/1999: RIH & reamed I backreamed to 9900'. Drilled to 10124' & POOH. PT'd 80PE. 8/22/1999: RIH & drilled to 10315'. 8/23/1999: Drilled to 10337' & POOH. RIH & drilled to 10500' MD. 8/24/1999: Drilled to 11005'. 8/25/1999: POOH. RIH & drilled to 11227' MD wi periodic trips to window. 8/26/1999: Drilled to TD @ 11694'. Conditioned OH. 8/27/1999: Can't conditioning OH. Layed in new mud while POOH. RIH wi 2-7/8" liner & landed it @ 11694'. TOL = 9554'. Cemented liner in place wi 25 bbls of 15.6 ppg Class G Cement. 8umped plug. Attained a max sqz press of 2000 psi & unstung fl liner. Contaminated Cement wi 8iozan & jetted contaminated Cement from the wellbore. POOH. WOC 8/28/1999: RD CTU #4 & MIRU CTU #5. RIH & logged well wI Mem CNUGR tools. POOH wI logging tools. Performed liner lap test @ 1600 psi @ 1.5 bpm - did not pass. RIH wI perf guns & tagged P8TD @ 11660'. Shot 840' of Initial Perforations f/: 10660' - 10850' MD (Zone 18) 10885' - 11105' MD (Zone 18) 11130' - 11185' MD (Zone 18) 11265' - 11640' MD (Zone 18) Used 2" carriers & all shots @ 4 SPF. POOH wI perf guns. ASF. Sidetrack Summary Page 1 07 -32A DESCRIPTION OF WORK COMPLETED COILED TUBING SIDETRACK DRILLING OPERATIONS SUMMARY Date Event Summary 8/29/1999: Displaced hole to Crude. RDMOL. Rig released @ 2000 hrs. 8/30/1999: RIH & drifted wi dummy RCP to TOL @ 9552' MD. 9/09/1999: MIRU CTU. PT equip. Killed well. RIH & set Liner Top Packer wi seals @ 9529' MD. Unable to release fl packer. 9/10/1999: Released fl Liner Top Packer. 9/12/1999: Successfully retrieved fish (packer running tool) fl wellbore. Placed well 07 -32A on initial production & obtained a valid well test. Sidetrack Summary Page 2 8400 ,--...., - Q.) 8500 Q.) '-i- "-'" ..c 8600 - 0... Q.) 0 8700 0 0 Q) UJ <J .Q ~ -t- (/) 8800 I.- Q.) > Q.) 8900 :J l.- I- I 9000 V ARC a Alaska, Inc. Brij Potnis Oolo plotted : 1 J-Sep-1999 LJ~ ~v Structure : D.S. 7 Field : Prudhoe Bay Well: 7-32A, 50-029-22525-01 Location : North Slope. Alaska Coordlnol.. or. In t..l r.ror.nco 7-J2. True Vorticol Depth. .r. rolcrence RKB - I.ISL = 61.9 It. Plat Re:tenlnca i. 7-J2Þ>.. --- Bok.r Hug~" INTEO --- East (feet) -> 400 600 BOO 1000 1200 BOO 600 400 200 o 200 1000 UßDO ~~ ~DQ[]0 rrWTJECQJ Projected to TD 7-32 Extended ehs 7-32 Extended ihs 7-32 Primary ehs ~9 0(0 ~ ~l 7-32bhs ORIGINAL Projected to TD 7-J2AP 1 RE('\·~~· 7ED . . vOl> ' ,;t: I \I.~ Tie-in Point SEP _,4 1999 AI.-on. GaIOèntt tommi.n ArttJ10ragè Projected ta TO ~ 7-32 7-32bhs 7-32ihs 7-32 Primary ehs 7-32 Extended ihs 7-32 Extended ehs Projected to TD 9100 2200 2300 2400 2500 2600 2700 2800 2900 3000 3100 3200 3300 3400 3500 3600 3700 3800 3900 4000 4100 Vertical Section (feet) -> Azimuth 39.00 with reference 0.00 N, 0.00 E from 7-32 4200 4300 1400 4800 4600 4400 "4200 ^ 4000 I z 0 ..., 3800 -+- :r ,--...., -+. 3600 CD ,CD . -rl- "-'" 3400 .' 3200 3000 2800 ARCO Alaska, Inc. D.S. 7 7-32APBl 7-32 Prudhoe Bay North Slope, Alaska SUR V E Y LIS TIN G by Baker Hughes INTEQ Your ref Our ref License 7-32APBl svy215 50-029-22525-71 Date printed Date created Last revised 13-Sep-1999 13-Sep-1999 13-Sep-1999 Field is centred on 708179.340,5930615.440,999.00000,N Structure is centred on 676170.772,5950924.457,999.00000,N Slot location is n70 16 8.389,w148 34 36.852 Slot Grid coordinates are N 5949997.300, E 675967.001 Slot local coordinates are 922.19 S 225.43 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North ARca Alaska, Inc. SURVEY LISTING Page 1 D.S. 7,7-32APBl Your ref 7-32APBl Prudhoe Bay,North Slope, Alaska Last revised 13-Sep-1999 Measured Inclin Azimuth Subsea R E C TANGULA R Dogleg Vert G RID C o 0 R D S Depth Degrees Degrees Depth C 0 0 R DIN ATE S Deg/l00ft Sect Easting Northing . 9548.00 36.10 352.30 8591.56 3045.19N 179.31W 0.45 2253.72 675716.47 5953037.27 9600.00 35.91 352.02 8633.62 3075.48N 183.48W 0.48 2274.63 675711.60 5953067.44 9652.00 36.15 349.92 8675.68 3105.68N 188.28W 2.42 2295.08 675706.09 5953097.52 9693.00 44.40 356.94 8706.95 3'131.97N 191. 17W 22.94 2313.69 675702.59 5953123.73 9759.00 45.10 1. 84 8753.83 3178.40N 191.65W 5.33 2349.47 675701.02 5953170.14 9814.00 45.70 4.84 8792.46 3217.49N 189.37W 4.03 2381. 29 675702.39 5953209.27 9842.00 46.20 4.80 8811.93 3237.54N 187.68W 1. 79 2397.93 675703.61 5953229.35 9871.00 47.30 5.04 8831. 80 3258.59N 185.86W 3.84 2415.43 675704.93 5953250.43 9903.00 48.10 3.64 8853.33 3282.19N 184.07W 4.09 2434.90 675706.16 5953274.06 9936.00 49.70 4.24 8875.03 3306.99N 182.36W 5.04 2455.25 675707.29 5953298.90 9987.00 60.30 6.44 8904.24 3348.52N 178.43W 21.08 2490.00 675710.25 5953340.51 10028.00 62.00 6.64 8924.02 3384.20N 174.34W 4.17 2520.30 675713.51 5953376.27 10074.00 60.60 358.64 8946.14 3424.45N 172.46W 15.55 2552.76 675714.44 5953416.56 10094.00 56.10 1. 94 8956.63 3441.47N 172.39W 26.52 2566.04 675714.12 5953433.57 10129.00 48.40 355.50 8978.06 3469.09N 172.93W 26.36 2587.16 675712.93 5953461.17 All data in feet unless otherwise stated. Calculation uses m~n~mum curvature method. Coordinates from 7-32 and SSTVD from RKB - MSL = 61.9 ft. Bottom hole distance is 3473.40 on azimuth 357.15 degrees from wellhead. Vertical section is from wellhead on azimuth 39.00 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ ARca Alaska, Inc. D.S. 7,7-32APB1 Prudhoe Bay,North Slope, Alaska MD SSTVD ----------------------------------------------------------------------------------------------------------- 9548.00 10129.00 8591. 56 8978.06 Target name Rectangular Coords. 3045.19N 3469.09N SURVEY LISTING Page 2 Your ref 7-32APB1 Last revised : 13-Sep-1999 Comment Comments in wellpath -------------------- -------------------- 179.31W , 172. 93W Tie-in Point Projected to TD Geographic Location Targets associated with this wellpath ===================================== SSTVD Rectangular Coordinates ----------------------------------------------------------------------------------------------------------- Revised 7-32 Primary.ehs 7-32ihs 7-32bhs 7-32 Extended ehs 7-32 Extended ihs 676325.000,5954385.000,99~.00 '676100.000,5954260.000,999.00 675775.000,5953635.000,999.00 676850.000,5954500.000,999.00 676545.000,5954450.000,999.00 8955.00 8955.00 8955.00 8940.00 8950.00 4378.40N 4258.69N 3641.43N 4481. 09N 4438.24N 460.64E 232.76E 106.80W 988.22E 682.11E 30-Jun-1999 30-Jun-1999 30-Jun-1999 16-Aug-1999 16-Aug-1999 r--.. - <LJ <LJ '+- -...- ..c: - 0.. <LJ 0 0 0 Q.1 UJ U .J:J += :J I..- (f) <LJ > OJ ::J l..- I- I V LJG ~C7 [7~LJO ~ffi ~C;]~0 IIJM1rJE~ 8400 8500 8600 8700 8800 8900 9000 Projected to TO 9100 ARca Alaska, Inc. Brij Potnis Ooto ploUed : 1 ~-Sep-1999 Plot Reference is 7-J2A. Coordlnot.. or. In rut r.t.r.ncs 7-32. True Vertical Depth. ore ror.ronce RK8 - !jSL = 61.9 It. --- 9<lkor Hugh.. INTEO --- 400 600 800 1000 1200 1400 Structure : D.S. 7 Field : Prudhoe Bay Well: 7-32A, 50-029-22525-01 Location : North Slope, Alaska 4800 Projected to TD 4600 7-~2A 7-32 Extended ehs 7-32 Extended ihs 4400 7-32 Primary ehs 7-32ihs 4200 ^ 4000 I SC1.. O(O~ z 0 .., 3800 -I- ORIGINAL ::r r--.. -+. 3600 CD CD -I- '-'" RE(~'~·- lED . .~. ,'¡~ t: I \. ...~ 340Q' St:P 1 4 1999 3200 Tie-in Point AI_OR a GarOra. Commi88fon 3000 -Mtftöflþ 2800 Projected to TO ~ 7-32bhs 7-32ihs 7-32 Primary ehs 7-32 Extended ihs 7-32 Extended ehs 2200 2300 2400 2500 2600 2700 2800 2900 3000 3100 3200 3300 3400 3500 3600 3700 3800 3900 40QO 4100 Vert i c a I S e c t ion (f e e t ) - > Azimuth 39.00 with reference 0.00 N, 0.00 E from 7-32 East (feet) -> 1000 800 600 400 200 o 200 7-32 Projected to TO 7-J2 4200 4300 ARCO Alaska, Inc. D.S. 7 7 - 3 2A 7-32 Prudhoe Bay North Slope, Alaska SUR V E Y LIS TIN G by Baker Hughes INTEQ Your ref Our ref License 7-32A svy216 50-029-22525-01 Date printed Date created Last revised 13-Sep-1999 13-Sep-1999 13-Sep-1999 Field is centred on 708179.340,5930615.440,999.00000,N Structure is centred on 676170.772,5950924.457,999.00000,N Slot location is n70 16 8.389,w148 34 36.852 Slot Grid coordinates are N 5949997.300, E 675967.001 Slot local coordinates are 922.19 S 225.43 W projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North ARCO Alaska, Inc. D.S. 7,7-32A Prudhoe Bay,North Slope, Alaska Measured Inclin Depth Degrees Azimuth Degrees 9548.00 9600.00 9652.00 9693.00 9759.00 9814.00 9893.00 9957.00 9998.00 10021.00 10078.00 10108.00 10128.00 10167.00 10199.00 10225.00 10268.00 10302.00 10333.00 10370.00 10401.00 10432.00 10451.00 10481.00 10506.00 10530.00 10561. 00 10594.00 10625.00 10670.00 10696.00 10741.00 10776.00 10821.00 10864.00 10916.00 10951.00 10976.00 11010.00 11066.00 11098.00 11139.00 11174.00 11255.00 11276.00 11307.00 11335.00 11378.00 11401.00 11434.00 36.10 35.91 36.15 44.40 45.10 45.70 65.60 74.60 73.80 71.90 70.00 68.90 67.60 69.80 73.90 77.00 79.70 81. 40 82.80 86.00 87.60 89.30 91.80 94.20 96 .40 96.40 96.60 94.60 91. 00 90.00 93.30 93.80 90.90 89.20 89.80 86.00 88.70 90.80 92.20 91.90 90.50 92.80 90.80 90.30 92.20 95.00 94.30 91.70 91.50 90.70 352.30 352.02 349.92 356.94 1. 84 4.84 12.34 21.00 21.00 18.74 12.54 8.14 6.64 4.14 5.14 7.94 12.70 15.64 15.34 16.14 19.40 25.74 33.24 37.74 35.04 38.94 37.74 35.64 43.04 47.74 50.74 52.64 51. 24 61.94 60.24 63.54 62.18 66.64 71.34 73.84 Subsea Depth 8591.56 8633.62 8675.68 8706.95 8753.83 8792.46 8836.85 8858.65 8869.81 8876.60 8895.22 8905.75 8913.16 8927.33 8937.30 4.44 2.64 2.44 4.64 6.54 8943.83 8952.51 8958.09 8962.35 8965.97 R E C TAN G U L A R COO R DIN ATE S 3045.19N 3075.48N 3105.68N 3:p1. 97N 3178.40N 3217.49N 3281.50N 3338.99N 3375.82N 3396.49N 3448.33N 3475.96N 3494.38N 3530.55N 3560.85N 3585.92N 3627.95N 3661.46N 3692.10N 3728.74N 3759.49N 3790.32N 3809.23N 3838.93N 3863.60N 3887.26N 3917.56N 3949.39N 3979.23N 4022.54N 4047.28N 4088.73N 4119.15N 4155.78N 4190.39N 4231.88N 4259.30N 4279.34N 4305.61N 4344.90N 4365.79N 4391.19N 4412.75N 4457.29N 4467.44N 4482.01N 4494.74N 4513.28N 4521. 52N 4531.39N 179.31W 183.48W 188.28W 191.17W 191.65W 189.37W 179.18W 161.83W 147.69W 140.22W 125.69W 120.65W 118.26W 114.85W 112.39W 110.29W 107.69W 106.21W 104.31W 100.72W 97.17W 94.10W 92.30W 88.39W 85.08W 82.10W 76.58W 68.54W 60.27W 48.07W 40.14W 22.91W 5.71W 20.41E 45.92E 77.17E 98.86E 113.79E 135.32E 175.15E 199.38E 231.54E 259.08E 326.59E 344.97E 372.25E 397.09E 435.80E 457.26E 488.74E Dogleg Deg/100ft 0.45 0.48 2.42 22.94 5.33 4.03 26.35 18.95 1. 95 12.51 10.81 14.21 9.53 8.21 13 .15 12.20 7.50 5.03 8.35 10.05 5.17 8.22 15.08 12.03 12.99 6.21 15.27 10.74 11.65 2.85 17.84 14.11 22.96 10.69 6.43 10.47 8.44 11.88 22.14 8.40 10.34 7.27 6.97 13 .22 12.14 13.94 5.45 11.99 20.45 7.95 SURVEY LISTING Page 1 Your ref 7-32A Last revised 13-Sep-1999 2253.72 2274.63 2295.08 2313.69 2349.47 2381.29 2437.45 2493.04 2530.56 2551. 32 2600.76 2625.40 2641.22 2671.47 2696.57 2717.38 2751. 68 2778.65 2803.66 2834.39 2860.52 2886.42 2902.25 2927.78 2949.04 2969.31 2996.32 3026.12 3054.51 3095.85 3120.07 3163.13 3197.59 3242.49 3285.44 3337.35 3372.31 3397.29 3431.25 3486.85 3518.33 3558.31 3592.40 3669.49 3688.95 3717.44 3742.97 3781.74 3801. 65 3829.13 Vert Sect G RID Easting COO R D S Northing 5953037.27 5953067.44 5953097.52 5953123.73 5953170.14 5953209.27 5953273.50 5953331.37 5953368.52 5953389.35 5953441.52 5953469.26 5953487.73 5953523.96 5953554.31 5953579.43 5953621.50 5953655.03 5953685.71 5953722.42 5953753.24 5953784.14 5953803.08 5953832.86 5953857.60 5953881. 32 5953911.74 5953943.75 5953973.77 5954017.35 5954042.27 5954084.11 5954114.92 5954152.15 5954187.34 5954229.55 5954257.47 5954277.86 5954304.62 5954344.83 5954366.27 5954392.42 5954414.62 5954460.72 5954471.30 5954486.51 5954499.81 5954519.25 5954527.99 5954538.60 All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from 7-32 and SSTVD from RKB - MSL = 61.9 ft. Bottom hole distance is 4603.04 on azimuth 9.32 degrees from wellhead. Vertical section is from wellhead on azimuth 39.00 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ 6.64 4.74 6.14 8.84 6.44 8967.70 8968.53 8968.35 8966.78 8964.47 8961.80 8958.29 8955.06 8953.55 8953.16 8952.41 8949.62 8948.18 8948.14 8948.52 8950.42 8952.04 8952.15 8951.26 8949.26 8948.59 8947.41 8946.31 8945.53 8945.07 8943.12 8940.85 8938.60 8937.96 8937.32 675716.47 675711.60 675706.09 675702.59 675701.02 675702.39 .675711.07 675727.07 675740.34 675747.32 675760.64 675765.03 675766.99 675769.55 675771.30 675772.82 675774.43 675775.13 675776.31 675779.04 675781.87 675784.22 675785.58 675788.78 675791.51 675793.94 675798.75 675806.04 675813.61 675824.80 675832.14 675848.40 675864.88 675890.13 675914.82 675945.09 675966.13 675980.59 676001.50 676040.39 676064.13 676095.68 676122.70 676189.15 676207.29 676234.22 676258.75 676297.01 676318.27 676349.51 ARca Alaska, Inc. SURVEY LISTING Page 2 D.S. 7,7-32A Your ref 7-32A Prudhoe Bay,North Slope, Alaska Last revised 13-Sep-1999 Measured Inclin Azimuth Subsea R E C T ANGULA R Dogleg Vert G RID C a a R D S Depth Degrees Degrees Depth C a a R D I N ATE S Deg/100ft Sect Easting Northing 11500.00 92.30 81.04 8935.59 4545.73N 553.09E 11.17 3880.77 676413.51 5954554.44 11562.00 94.70 87.04 8931.81 4552.16N 614.61E 10.41 3924.48 676474.85 5954562.30 11617.00 94.10 94.14 8927.58 455l.59N 669.41E 12.92 3958.52 676529.64 5954563.02 11642.00 95.20 97.54 8925.55 4549.06N 694.19E 14.25 3972.15 676554.48 5954561.07 11694.00 95.20 97.54 8920.84 4~42.26N 745.53E 0.00 3999.18 676605.96 5954555.48 All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from 7-32 and SSTVD from RKB - MSL = 61.9 ft. Bottom hole distance is 4603.04 on azimuth 9.32 degrees from wellhead. Vertical section is from wellhead on azimuth 39.00 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ ARCO Alaska, Inc. D.S. 7,7-32A Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 3 Your ref 7-32A Last revised: 13-Sep-1999 Comments in wellpath -------------------- -------------------- MD SSTVD Rectangular Coords. Comment ----------------------------------------------------------------------------------------------------------- 9548.00 11694.00 8591. 56 8920.84 3045.19N 4542.26N 179.31W . 745. 53E Tie-in Point Projected to TD Targets associated with this wellpath ------------------------------------- ------------------------------------- Target name Geographic Location SSTVD Rectangular Coordinates Revised ----------------------------------------------------------------------------------------------------------- 7-32 Primary ehs 676325.000,5954385.000,999..00 8955.00 4378.40N 460.64E 30-Jun-1999 7-32ihs ,676100.000,5954260.000,999.00 8955.00 4258.69N 232.76E 30-Jun-1999 7-32bhs 675775.000,5953635.000,999.00 8955.00 3641. 43N 106.80W 30-Jun-1999 7-32 Extended ehs 676850.000,5954500.000,999.00 8940.00 4481.09N 988.22E 16-Aug-1999 7-32 Extended ihs 676545.000,5954450.000,999.00 8950.00 4438.24N 682.11E 16-Aug-1999 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Robert Christenson ~/12., Chairman (JIlfC/ DATE: August 21, 1999 THRU: Blair Wondzell, p, I. Supervisor ~ 9/ 'ê-T(', FILE NO: afplhugf .doc FROM: John H Spaulding,m Petroleum Inspect~¡~ SUBJECT: BOP Test Dowell / Nabors 3S PBU 7-32A PTD 99-69 August 21, 1999: I traveled to ARCO OS 7 well 32A to witness the BOPE test on Dowell/Nabors 3S Coiled Tubing Drilling Unit. The AOGCC BOPE test report is attached for reference. As noted on the test report no failures were observed. The rig was in very good condition and all of the personel understood there positions. SUMMARY: I witnessed the BOP test on; Dowell/Nabors 3S, 28 components, 5 hours, no failures Attachment: afplhugf .xls Not confidential STATE OF ALASKA OIL AÑD GAS CONSERVATION COMMISSION Coil Tubing Unit BOPE Test Report - OPERATION: Drlg Contractor: Operator: Well Name: Casing Size: Test: Drlg: X Workover: Dowell 1 Nabors 3-S ARGO Rig No. 413S PTD # Rep.: Rig Rep.: Location: Sec. 99-69 DATE: 8121199 Rig Ph.# 659-5514 Steve Bradley Dave Duerr 11N R. 14E Meridian Umiat 4.5" Initial 07 -32A Set@ Weekly 11,350' md X Other 33 1. TEST DATA ... Test Test BOP STACK: Quan. Pressure P/F CHOKE MANIFOLD: Quan. Pressu re P/F Coil Tubina Unit: No. Valves 20 35013500 P Pipe/Slip Rams No. Flanges 65 35013500 P Pipe/Slip Rams Manual Chokes 2 Functioned P Blind Rams - - Hydraulic Chokes 2 Functioned ~ Reel Isolation Valve - DeDlovment: ACCUMULATOR SYSTEM: Annular Preventer 1 250/2500 P System Pressure 3050 t= Pipe Rams 1 350/3500 P Pressure After Closure 2,250 Lower Pipe Rams 1 350/3500 P 200 psi Attained After Closure minutes 9 sec. - Blind Rams 1 350/3500 P System Pressure Attained minutes 36 sec. - Choke Ln. Valves 1 350/3500 P Blind Switch Covers: Master: X Remote: X HCR Valves 1 350/3500 P Nitgn. Btl's: 4 @ 2100 avg. Psig. Kill Line Valves 2 350/3500 P MUD SYSTEM: Visual Alarm MISC. INSPECTIONS: Trip Tank ok ok Location Gen.: ok Well Sign yes Pit Level Indicators ok ok Housekeeping: ok Drl. Rig ok Meth Gas Detector ok ok ", Permit to drill: yes Hazard Sec. yes H2S Gas Detector ok ok"" Standing Order Posted yes - TEST RESULTS . .. .. Number of Failures: 0 ,Test Time: 5.0 'Hours. Number of valves tested 28 Repair or Replacement of Failed Equipment will be made within nla days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Distribution: orig-Well File c - Oper.lRig c - Database c - Trip Rpt File c - Inspector STATE WITNESS REQUIRED? YES X NO Waived By: Witnessed By: John H. Spaulding 24 HOUR NOTICE GIVEN YES X NO Form Revised 2/20197 L.G. afplhugf.xlt 8/26/99 AOGCC Lori Taylor 3010 Porcupine Drive Anchorage, AK 99510 Well Reference Well No: Field: County: state: (0'-99 \ {\'\ · qCSq ?/ Data: 07-32APBl Prudhoe Bay North Slope Alaska Date: 08/10/00 API No: 500292252570 BHI Job#: 107313 Unit Enclosed is the following data as listed below: Log Type Bluelines Navigamma USMPR MDL/MNP DPR/MDL/MDP TOTALS: Log Type Bluelines Navigamma USMPR MDL/MNP DPR/MDL/MDP 2" + 5" Measured Depth Logs Folded Sepias Rolled Sepias Mylar Film 1 1 2" + 5" True Vertical Depth Logs Folded Sepias Rolled Sepias Mylar Film 1 1 LAS Disks Survey Listing ASCII Disks LIS Tape Image File Disks :1 LIS Verifièation Report & Listings :1 Depth Shift Monitor Plot Upon Receipt, Please sign and fax to: Baker Hughes INTEQ ~~~~ ~ ~~i~~~~~and AUG 1 6 2000 Date: Alaska Oil & Gas Cons. Commission Anchorage AOGCC Lori Taylor 3010 Porcupine Drive Anchorage, AK 99510 Well Reference Well No: Field: County: state: q~ aC( . OW "'I q S to", ~ Data: 07-32A Prudhoe Bay North Slope Alaska Unit Date: 08/10/00 API No: 500292252501 BHI Job#: 107313 Enclosed is the following data as listed below: 2" + 5" Measured Depth Logs Log Type Bluelines 1 Navigamma USMPR MDL/MNP DPR/MDL/MDP TOTALS: Folded Sepias Rolled Sepias Mylar Film 1 2" + 5" True Vertical Depth Logs Log Type Bluelines 1 Navigamma USMPR MDL/MNP DPR/MDL/MDP Folded Sepias Rolled Sepias Mylar Fi.lm 1 LAS Disks Survey Listing ASCII Disks LIS Tape Image File Disks :1 LIS Verification Report & Listings :1 Depth Shift Monitor Plot Upon Receipt, Please sign and fax to: Baker Hughes INTEQ Fax#· .£.9»7-), ,2,Eµ-6621 AttnR~~~tV~[íerland 8 ~G.Mm Recei ved by: () A'IG 16 ?oon Date: Alaska Oil & Gas Cons. Commissior¡ Anchorage TONY KNOWLES, GOVERNOR ALASKA OIL AND GAS CONSERVATION COltDlISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 July 19. 1999 Bruce E. Smith, P.E. AAI Coil Tubing Drilling Engineer ARCO Alaska, Inc. POBox 100360 Anchorage~ AK 99510-0360 Re: Prudhoe Bay Unit 7-32A ARCO Alaska. Inc. Permit No: 99-69 Sur Loc: 919'FNL. 227'FEL, Sec. 33, TllN, Rl4E UM Btmholc Loc. 1718'FNL. 5029'FEL, Sec. 27, TllN, RI4E, UM Dear Mr. Smith: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies. and does not authorize conducting drilling operations until all other required permitting determinations are made. Blo\\"out prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to \\"itness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Robert N. Christenson. P. E. Chainnan BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 1 a. Type of work: Drill 0 Redrill 0 1b. Type 01 well. Exploratory 0 Stratigraphic Test 0 Development Oil [t] Re-entry o Deepen 0 Service Development Gas 0 Single Zone 0 Multiple Zone 0 2. Name of Operator 5. Datum elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB 62 feet 3. Address 6. Property Designation Prudhoe Bay Field P.O. Box 100360 Anchorage, AK 99510-0360 ADL 28309 Prudhoe Bay Oil Pool 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.0251) 919' FNL, 227' FEL, Sec. 33, T11 N, R14E, UM Prudhoe Bay Unit Statewide At top 01 productive interval 8. Well number Number 2566' FSL, 449' FEL, SEC. 28, T11N, R14E, UM 07-32A #U-630610 At total depth 9. Approximate spud date Amount 1718' FNL, 5029' FEL, Sec 27, T11N, R14E, UM July 21, 1999 $200,000 12. Distance to nearest property line 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) feet No Close Approach feet 11365' MD 19017' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e)(2)) Kickoff depth: 9690' MD Maximum hole angle 91.8° Maximum surface 2600 psig At total depth (TVD) 3257 psiq @ 8800' 18. Casing program Setting Depth size Specifications Top Bottom Quantity of Cement Hole Casinç¡ Weight Grade Coupling Length MD TVD MD TVD (include stage data) 4-1/8" 2-7/8" 6.4 L-80 FL4S 1765' 9600' 8695' 11365' 9017' 20 bbls nrrf'"I\lr'f"\. 11\ i: \., I: J V t: L} in It VO 1999 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary A!cMka Oil & Gas Cons. Commission Total Depth: measured 11350 feet Plugs (measured) PBTD tagge -@ 971 0" f)\~ÓR61%'gS99) true vertical 8997 feet Effective Depth: measured 9710' 1eet Junk (measured) true vertical 8783 1eet Casing Length Size Cemented Measured depth True Vertical depth Conductor 115' 20" 260 Sx Arcticset 112' 112' Surface 3252' 10-3/4" 1050 Sx CS III & 375 Sx Class G 3286' 3281' Production 10190' 7-5/8" 785 Sx Class G 10221' 9010' Liner 1304' 4-1/2" Uncemented 11350' 11350' Perforation depth: measured 9840' - 9846'; 9858' - 9864'; (Isolated slotted liner 1/10132' - 11326' by CIQ R / G / N true vertical 8868' - 8872'; 8880' - 8883'; (Isolated slotted liner 1/9001' - 8997' by CIBP). '4 L 20. Attachments Filing fee 0 Property Plat 0 BOP Sketch [t] Diverter Sketch 0 Drilling program [t] Drilling fluid program Time vs depth plot o Refraction analysis 0 Seabed report 0 20 MC 25.050 requirements 0 21. I hereby certify that the foregoing is true and correct to the best 01 my knowledge Questions? Call Stephen Ward @ 265-1305. Signed ~~ J2.. ~~~ Title: AAI Coil Tubing Drilling Supervisor Date '7/1/19 Prepared by Paul Rauf 263-4990 Commission Use Onl\ permit#u9~r ~ <1 API number Approval date 9 9 f See cover letter 50- CJ 2. 1- 2. ~ ~ <...5 -0 / -¡,/ - 10r other requirements Conditions 01 approval Samples required DYes JXl No Mud log required 0 Yes 31 No Hydrogen sulfide measures ~ Yes 0 No Directional survey required EI Yes 0 No Required working pressure for BOPE D2M; o 3M; 0 5M; 0 10M;D o 3500 psi 10r CTU Other: 'JRIGINAL SIGNED BY by order 01 ~'-19.- 9f APcroved bv Robert N. Christenson Commissioner the commission Date Form 10-401 Rev. 12/1/85 · Submit in triplicate DS 7-32A CT Sidetrack and Completion Intended Procedure Objective: Plugback existing wellbore. Directionally drill a horizontal well from the existing wellbore. Complete with 2-7/8" cemented liner. Perforate and produce. Intended Procedure: · Cement squeeze and plugback the existing completion to - 9600' md. · Mill window in 7-5/8" casing at -9690' md. Drill 10' of fonnation with 8.5 ppg Flopro fluid and perfonn Leak off test to 9.0 ppg. · Directionally drill 3.7511 x 1600' horizontal well to access Upper Romeo and Tango reserves. Build angle to -910 to TD. · Run and cement 2-7/8"" liner to TD. · Perforate selected intervals. · Place well on production. NOTE: Drill cuttings will be disposed of at CC2A or GNI and drilling mud will be disposed at CC2A, GNI, or Pad 3. June 30, 1999 4400 '¡200 ^ I .. ¡fOOO Z 0 ::¡ .. !,¡'¡OO :::J r---. -n CD :l6()O ~ '--" MOO ,\:WO .. ::;000 . :~SOCl 4600 4800 '-__I. ~)OOO age Vertica I Secti on ( feet) - > Azimuth 24.00 with reference 0.00 N, 0.00 E from 7-32 -ì-~-~'~--¡-- -T-·-"·ì----'·r-'-r-~r---·T -- -ì--- ··-r·'----r··--·-'~r· "-"--I"'-'-""~-'-'-'-I- -·"-···-r--'-~~'··'·I--· "1 ~-_.- '1"--"- I '-"---'-r"- ··TO --. --1·--" ·I··--·--I-·---·T·'··--'·-r··---r·--·~-··"·¡--··-·ì--ì--T---¡-'-r'''---l--r--'--I 2600 2}(JO 2BOO 2900 :5000 :1100 ,5;!(J(J ::;:100 34 00 !,~)O() .5GOO :1/00 3BCl05!JOO 4000 4100 4200 4·!,OO 4400 4500 }-,')::'"hs TlJ . 7-:5::'il1,-, ru } --:52ehs ¡"Oilll 7-,:,2ihs 1000 C.OO L----1-._l__._L___L-__L__.-1.__1 ____l~__L_..J_.__._!__,---L___1-__L____L___~_L__~__L__L___l._ I·¡OO 800 --- Boker Hughcs INTEQ --- l'<le 'Jt·rl,(.o l L"p!h:; [ I,- ,,·I'·lt'l\t·" ¡;:)\8 - tl:;L (·(\f'rr1mot..~: 'HI,' IfJ I....! ,,.t,'rf'l\r'· ì -.\:' 7-j:,';, Vt:r-dl'l1ff 1 ¡Jol" pll,tt..U :"¡)-.h,,,-1:j!j:i Cr.~.tJt,.'.:: I"y p!'\nl'. ·¡OO ~O() ~oo - West (feet) ·¡OO liOO 800 10011 1 :!(i0 Location North Slope. Alaska Structure: D.S. 7 Field: Prudhoe Bay Well 7-32A Plan, 50-029-22525-01 if ,¡, 1~ J... J }~8!, S Ie ,8~ :¡ K""l\ \.\......../ Tie on ---.--..-.---.........----. ~-~ ..-.,-., Uh3lJO I~ì i;\ rvz[~Io) 1..:'.)L,",~lJ0. .3L~\ C=JOD(~{;~[]8 ] r"'~" ~-,,' ~-~, <~( ~ 8500 Q) Q) '+- '--" 8600- .£ -+- 0... Q) 8700·, 0 a ~ ü .g 8800· += L (II Q) > ô ,W 0 Q) :J L -- 9000 - I V ,)100 - m~r'Irm~cçì? If~~œ Proposal Calculations BAKER HUGHES Coordinates provided in: TRUE and GRID relative to Wellhead INTEQ and ALASKA STATE PLAN Company: ARCa Alaska, Inc. Vertical Sect. Plane: 24.000 TRUE Job No: 0 Field: Prudhoe Bay, Alaska Mag. Declination: 27.710 AFE No: 0 Well: 7 -32A Version #1 Grid Correction: 1.340 API No: 50-029- 22525-01 Rig: Nabors 3S Total Correction: 26.370 BHI Rep: 0 Surface Location Dip: 80.730 Job Start Date: OO-Jan-OO X: 675967.0 RKB Height: 61.900 Job End Date: OO-Jan-OO Y: 5949997.3 Meas. Incl. TRUE Subsea Coords. - True Coords. - ASP Dogleg Vertical Tool Face Build Turn Depth Angle AzÏ. TVD N(+)/S(-) E(+)/W(-) N(+)/S(-) E(+)/W(-) Severity Section Comments (deg) (deg) (ft) Lat. (Y) Dep. (X) Lat. (Y) Dep. (X) (0 II OOft) (TIP) (0 II OOft) (0 II OOft) 9548.00 36.10 352.30 8591.56 3045.19 -179.31 5953037.27 675716.47 0.00 2708.99 -138.00 0.00 0.00 Tie on 9573.00 36.01 352.16 8611.77 3059.77 -181.30 5953051.79 675714.14 0.48 2721.50 -138.00 -0.36 -0.56 9598.00 35.92 352.03 8632.00 3074.32 -183.32 5953066.28 675711.78 0.48 2733.96 -138.00 -0.3 6 -0.52 9600.00 35.91 352.02 8633.62 3075.48 -183.48 5953067.44 675711.59 0.48 2734.96 -138.00 -0.50 -0.50 9603.00 35.90 352.00 8636.05 3077.22 -183.73 5953069.18 675711.31 0.48 2736.45 -106.00 -0.33 -0.67 9623.00 35.75 351.13 8652.27 3088.80 -185.44 5953080.71 675709.32 2.67 2746.33 -105.00 -0.75 -4.35 9644.00 35.60 350.20 8669.33 3100.88 -187.43 5953092.75 675707.05 2.67 2756.56 -17.00 -0.71 -4.43 9648.00 35.87 350.06 8672.58 3103.19 -187.83 5953095.04 675706.60 7.18 2758.50 -16.00 6.75 -3.50 9673.00 37.59 349.20 8692.61 3117.89 -190.53 5953109.68 675703.56 7.18 2770.84 -16.00 6.88 -3.44 9676.00 37.80 349.10 8694.98 3119.69 -190.87 5953111.47 675703.17 7.18 2772.35 28.00 7.00 -3.33 9690.00 39.57 350.62 8705.91 3128.31 -192.41 5953120.04 675701.43 14.34 2779.59 60.00 12.64 10.86 Kick-off Point 9698.00 40.02 351.86 8712.06 3133.37 -193.19 5953125.08 675700.54 11.45 2783.90 60.00 5.63 15.50 9700.00 40.14 352.17 8713.59 3134.64 -193.37 5953126.35 675700.33 11.45 2784.99 59.00 6.00 15.50 I - 9723.00 41.51 355.60 8731.00 3149.59 -194.96 5953141.26 675698.38 11.45 2797.99 57.00 5.96 14.91 ... - 9748.00 43.12 359.12 8749.49 3166.39 -195.73 5953158.04 675697.22 11.45 2813.04 54.00 6.44 14.08 9773.00 44.82 2.43 8767.48 3183.74 -195.48 5953175.39 675697.06 11.45 2828.98 52.00 6.80 -1426.76 9798.00 46.62 5.55 8784.94 3201.59 -194.23 5953193.26 675697.90 11.45 2845.80 50.00 7.20 12.48 9800.00 46.77 5.79 8786.31 3203.04 -194.09 5953194.71 675698.01 11.45 2847.18 49.00 7.50 12.00 9823.00 48.49 8.47 8801.81 3219.90 -191.97 5953211.61 675699.72 11.45 2863.44 48.00 7.48 11.65 9848.00 50.44 11.24 8818.06 3238.61 -188.72 5953230.40 675702.54 11.45 2881.86 46.00 7.80 11.08 9873.00 52.45 13.84 8833.64 3257.69 -184.47 5953249.57 675706.34 11.45 2901.02 44.00 8.04 10 .40 9898.00 54.51 16.31 8848.52 3277.09 -179.24 5953269.08 675711.12 11.45 2920.86 43.00 8.24 9.88 9900.00 54.68 16.51 8849.68 3278.65 -178.77 5953270.65 675711.54 11.45 2922.48 43.00 8.50 10.00 9923.00 56.62 18.66 8862.66 3296.75 -173.04 5953288.88 675716.86 11.45 2941.35 41.00 8.43 9.35 9948.00 58.77 20.89 8876.02 3316.63 -165.88 5953308.92 675723.54 11.45 2962.42 40.00 8.60 8.92 9973.00 60.96 23.02 8888.57 3336.67 -157.80 5953329.15 675731.16 11.45 2984.02 39.00 8.76 8.52 9998.00 63.18 25.07 8900.28 3356.84 -148.79 5953349.52 675739.68 11.45 3006.11 38.00 8.88 8.20 10000.00 63.36 25.23 8901.18 3358.46 -148.04 5953351.15 675740.41 11.45 3007.89 38.00 9.00 8.00 10023.00 65.43 27.03 8911.12 3377.07 -138.90 5953369.98 675749.10 11.45 3028.62 37.00 9.00 7.83 Meas. Incl. TRUE Subsea Coords. - True Coords. - ASP Dogleg Vertical Tool Face Build Turn Depth Angle Azi. TVD N(+)/S(- ) E(+)/W(-) , N(+)/S(-) E(+)/W(-) Severity Section Comments (de~) (de~) (ft) Lat. (Y) Dep. (X) Lat. (Y) Dep. (X) (0 II o Oft) (TIP) (0 II OOft) (0 II OOft) 10898.00 90.67 14.63 8965.97 4154.21 162.24 5954153.90 676031.95 12.09 3861.04 88.00 0.40 12.08 10900.00 90.67 14.88 8965.94 4156.14 162.75 5954155.84 676032.41 12.09 3863.02 88.00 0.00 12.50 10923.00 90.76 17.66 8965.66 4178.21 169.19 5954178.06 676038.34 12.09 3885.81 88.00 0.39 12.09 10948.00 90.84 20.68 8965.31 4201.82 177.40 5954201.85 676045.99 12.09 3910.71 88.00 0.32 12.08 10973.00 90.93 23.70 8964.92 4224.97 186.84 5954225.21 676054.88 12.09 3935.69 88.00 0.36 12.08 10998.00 91.01 26.72 8964.50 4247.58 197.48 5954248.06 676065.00 12.09 3960.68 88.00 0.32 12.08 11000.00 91.02 26.97 8964.46 4249.36 198.39 5954249.87 676065.86 12.09 3962.68 88.00 0.50 12.50 11023.00 91.09 29.75 8964.04 4269.60 209.31 5954270.35 676076.30 12.09 3985.61 88.00 0.30 12.09 11048.00 91.17 32.77 8963.55 4290.96 222.28 5954292.01 676088.77 12.09 4010.40 88.00 0.32 12.08 11073.00 91.24 35.79 8963.02 4311.61 236.35 5954312.98 676102.35 12.09 4034.99 88.00 0.28 12.08 11098.00 91.31 38.81 8962.47 4331.49 251.50 5954333.21 676117.03 12.09 4059.31 88.00 0.28 12.08 I - 11100.00 91.32 39.06 8962.42 4333.05 252.75 5954334.80 676118.25 12.09 4061.24 88.00 0.50 12.50 11123.00 91.38 41.84 8961.88 4350.54 267.67 5954352.63 676132.75 12.09 4083.29 88.00 0.26 12.09 11148.00 91.44 44.86 8961.27 4368.72 284.82 5954371.20 676149.47 12.09 4106.87 88.00 0.24 12.08 11173.00 91.50 47.88 8960.62 4385.96 302.91 5954388.86 676167.15 12.09 4129.98 88.00 0.24 12.08 11198.00 91.55 50.91 8959.96 4402.22 321.88 5954405.56 676185.74 12.09 4152.55 89.00 0.20 12.12 11200.00 91.56 51.15 8959.91 4403.48 323.44 5954406.86 676187.26 12.09 4154.33 89.00 0.50 12.00 11223.00 91.60 53.93 8959.27 4417.46 341.69 5954421.26 676205.17 12.09 4174.53 89.00 0.17 12.09 11248.00 91.65 56.96 8958.56 4431.63 362.27 5954435.91 676225.41 12.09 4195.84 89.00 0.20 12.12 11273.00 91.69 59.98 8957.83 4444.70 383.56 5954449.47 676246.40 12.09 4216.44 89.00 0.16 12.08 11298.00 91.72 63.00 8957.09 4456.62 405.52 5954461.91 676268.07 12.09 4236.27 89.00 0.12 12.08 11300.00 91.73 63.25 8957.03 4457.53 407.30 5954462.85 676269.83 12.09 4237.82 89.00 0.50 12.50 11323.00 91.76 66.03 8956.33 4467.37 428.07 5954473.18 676290.36 12.09 4255.26 89.00 0.13 12.09 11348.00 91.78 69.05 8955.56 4476.92 451.17 5954483.26 676313.22 12.09 4273.37 89.00 0.08 12.08 11365.91 91.80 71.22 8955.00 4483.00 468.00 5954489.74 676329.91 12.09 4285.78 0.00 0.11 12.12 TO Meas. Incl. TRUE Subsea Coords. - True Coords. - ASP Dogleg Vertical Tool Face Build Turn Depth Angle Azi. TVD N(+ )/S(-) E(+)IW(-) N(+)/S(- ) E(+)IW(-) Severity Section Comments (deg) (deg) (ft) Lat. (Y) Dep. (X) Lat. (Y) Dep. (X) (0/100ft) (TIP) (°11 o Oft) (0/100ft) 10048.00 67.70 28.92 8921.07 3397.33 -128.14 5953390.48 675759.39 11.45 3051.49 37.00 9.08 7.56 10073.00 70.00 30.76 8930.09 3417.55 -116.53 5953410.96 675770.51 11.45 3074.69 36.00 9.20 7.36 10098.00 72.31 32.54 8938.16 3437.68 -104.12 5953431.38 675782.45 11.45 3098.13 35.00 9.24 7.12 10100.00 72.49 32.68 8938.77 3439.29 -103.09 5953433.01 675783.44 11.45 3100.02 35.00 9.00 7.00 10123.00 74.64 34.27 8945.28 3457.69 -90.92 5953451.69 675795.17 11.45 3121.77 35.00 9.35 6.91 10148.00 76.98 35.97 8951.41 3477.51 -76.98 5953471.83 675808.65 11.45 3145.55 34.00 9.36 6.80 10173.00 79.33 37.63 8956.54 3497.1 0 -62.32 5953491.75 675822.84 11.45 3169.41 34.00 9.40 6.64 10198.00 81.69 39.27 8960.66 3516.41 -46.99 5953511.41 675837.72 11.45 3193.28 34.00 9.44 6.56 10200.00 81.88 39.40 8960.94 3517.94 -45.73 5953512.97 675838.94 11.45 3195.19 34.00 9.50 6.50 10223.00 84.06 40.89 8963.76 3535.38 - 31. 02 5953530.76 675853.24 11.45 3217.12 34.00 9.48 6.48 10248.00 86.43 42.50 8965.83 3553.98 -14.45 5953549.74 675869.37 11.45 3240.85 33.00 9.48 6.44 - 10273.00 88.81 44.10 8966.87 3572.16 2.68 5953568.31 675886.07 11.45 3264.42 33.00 9.52 6.40 " 10285.55 90.00 44.90 8967.00 3581.11 11.48 5953577.47 675894.65 11.45 3276.17 -90.00 9.48 6.37 3 10298.00 90.00 43.43 8967.00 3590.04 20.15 5953586.60 675903.11 11.79 3287.86 -90.00 0.00 -11.81 10300.00 90.00 43.19 8967.00 3591.50 21.52 5953588.08 675904.45 11.79 3289.75 -90.00 0.00 -12.00 10323.00 90.00 40.48 8967.00 3608.63 36.86 5953605.57 675919.38 11.79 3311.64 -90.00 0.00 -11.78 10348.00 90.00 37.53 8967.00 3628.06 52.60 5953625.36 675934.66 11.79 3335.79 -90.00 0.00 -11.80 10373.00 90.00 34.59 8967.00 3648.26 67.31 5953645.90 675948.90 11.79 3360.23 -90.00 0.00 -11.76 10398.00 90.00 31.64 8967.00 3669.20 80.97 5953667.15 675962.06 11.79 3384.91 -90.00 0.00 -11.80 10400.00 90.00 31.40 8967.00 3670.91 82.01 5953668.88 675963.06 11.79 3386.90 -90.00 0.00 -12.00 10423.00 90.00 28.69 8967.00 3690.81 93.53 5953689.05 675974.11 11.79 3409.77 -90.00 0.00 -11.78 10448.00 90.00 25.75 8967.00 3713.04 104.96 5953711.54 675985.02 11.79 3434.72 -90.00 0.00 -11.76 10473.00 90.00 22.80 8967.00 3735.83 115.24 5953734.56 675994.76 11.79 3459.72 -90.00 0.00 -11.80 10498.00 90.00 19.85 8967.00 3759.11 124.33 5953758.05 676003.30 11.79 3484.69 -90.00 0.00 -11.80 10500.00 90.00 19.62 8967.00 3761.00 125.01 5953759.95 676003.93 11.79 3486.69 -90.00 0.00 -11.50 10523.00 90.00 16.91 8967.00 3782.84 132.21 5953781.95 676010.62 11.79 3509.57 -90.00 0.00 -11.78 10548.00 90.00 13.96 8967.00 3806.93 138.86 5953806.19 676016.71 11.79 3534.29 -90.00 0.00 -11.80 10573.00 90.00 11.01 8967.00 3831.34 144.27 5953830.72 676021.54 11.79 3558.78 -90.00 0.00 -11.80 - 10598.00 90.00 8.06 8967.00 3855.99 148.41 5953855.46 676025.10 11.79 3582.99 -90.00 0.00 -11.80 ( - 10600.00 90.00 7.83 8967.00 3857.97 148.69 5953857.44 676025.33 11.79 3584.91 -90.00 0.00 -11.50 10623.00 90.00 5.12 8967.00 3880.82 151.28 5953880.35 676027.39 11.79 3606.84 -90.00 0.00 -11.78 10648.00 90.00 2.17 8967.00 3905.77 152.87 5953905.32 676028.40 11.79 3630.27 -90.00 0.00 -11.80 10673.00 90.00 359.22 8967.00 3930.77 153.17 5953930.32 676028.11 11.79 3653.23 -90.00 0.00 1428.20 10698.00 90.00 356.28 8967.00 3955.74 152.19 5953955.27 676026.55 11.79 3675.65 -90.00 0.00 -11.76 10700.00 90.00 356.04 8967.00 3957.74 152.06 5953957.26 676026.37 11.79 3677.42 -90.00 0.00 -12.00 10722.36 90.00 353.41 8967.00 3980.00 150.00 5953979.46 676023.79 11.79 3696.92 88.00 0.00 -11.76 4 10723.00 90.00 353.48 8967.00 3980.64 149.93 5953980.10 676023.70 12.09 3697.47 88.00 0.00 10.94 10748.00 90.10 356.50 8966.98 4005.54 147.75 5954004.94 676020.94 12.09 3719.34 88.00 0.40 12.08 10773.00 90.20 359.53 8966.91 4030.52 146.88 5954029.89 676019.49 12.09 3741.81 88.00 0.40 12.12 10798.00 90.29 2.55 8966.81 4055.51 147.33 5954054.89 676019.36 12.09 3764.82 88.00 0.36 -1427.92 10800.00 90.30 2.79 8966.80 4057.51 147.42 5954056.89 676019.40 12.09 3766.68 88.00 0.50 12.00 10823.00 90.39 5.57 8966.66 4080.45 149.10 5954079.86 676020.54 12.09 3788.32 88.00 0.39 12.09 10848.00 90.48 8.59 8966.47 4105.25 152.18 5954104.73 676023.04 12.09 3812.23 88.00 0.36 12.08 10873.00 90.57 11.61 8966.24 4129.86 156.57 5954129.43 676026.85 12.09 3836.50 88.00 0.36 12.08 C T Drilling Wellhead Detail -- CT Injector Head -- Stuffing Box (Pack-Off), 10,000 psi Working Pressure ~ - 7" Riser Methanol Injection 8tis r WLA Quick onnect - Annular BOP (Hydril),7-1/16" ID 5,000 psi working pressure HCR - 0.29' (3.5") Cutters or Combination Cutter/Blinds Slip I Pipe rams Alignment Guide Flange 7-1/16", 5M Ram Type Dual __ Gate BOPE Flanged Fire Resistant Kelly Hose to Dual Choke Manifold " t Man Drilling spool 7-1/16", 5M by 7-1/16", 5M Ram Type Dual Gate BOPE Manual over Hydraulic -- 7-1/16" ID with Pipe/Slip Rams 2" Pump-In t Fire resistant Kelly Hose to Flange by Hammer up 1/4 Turn Valve on OS Hardline to Standpipe manifold Manual Master Valve CØ) / Tubing Hanger 0.458' (5.5") 9-5/8" Annulus 13-3/8" Annulus o 60/40 I I Trplx I ¡PiPe ra:( Q Ext. g D rro Os» (Q^" (QCD s·...,. (Q5" -leD ~.c ==$: ~~ o Fire Ext. ~ c: c.. c.. co 0 0 l- I- I- ~ c:~ c:~ <D <Dc: <Dc: C> c..co c..co ¡= 01- 01- o Dowell Drilling Equipment Trailer ~ Preferred Major Equipment Layout for CT Drilling 4-1/2" Camco TRCF-4A SSSV 20741 7-5/8" Packer 9584 I 4-1/2" Otis "X" Nipple @ 96181; 4-1/2" Tubing Tail 96401 FiII& damaged csg 96961 DS 7-32A Proposed Completion Wellbore Sketch 4-1/2" Production Tubing -112" Camco GLMs 2-7/8" Liner top in 4-1/2" Window in 7-5/8" csg @ 9690 - 96951 4-1/2" Slotted Liner TIW SS Packer @ 100461 7-5/8" Shoe 102211 3.75 II Openhole +/-16001 2.875" Cmtld Liner TD +/- 113651 11,3501 ':1 111 ''f PAUL RAUF ARCa ALASKA INC. P. O. BOX 100360 ATO - 1509 _. ., ANCHORAGE, AK 99510-0360 <Date 7-1- 99 . (rqfìaY'loth~ /1 I L. 9 / I /' (" : ~Pbr~r of¿d_Lq~~___ c; I ___~J.Ld.L__ .0 M__ I $ I () 0 (') 0 /) / '1·~ Chi?! n(t..~;;~~- . -<Dolhrsrtl ¡ -- ------------.----------.-------------....------ .~!~a~~I~~gcago Chicago, Illinois 60670 , h"~_~"J,~"{{ 1:0 ? ~OOOO ~ 31: gO 2 (;8 5 ~". 015412452359 2-1/710 ~~OR OVER $1000.00... ~----- ~~ -------- o ~ ~ ~ 1$-'-- WELL NAME/'~ 07-22,4 PROGRAM: exp INIT CLASS .(}e.u /-ó,// GEOL AREA dev ~?O WELL PERMIT CHECKLIST COMPANY 6 7'rJ) SO ADMINISTRATION 1. Permit fee attached. . . . . . . . . . .. ....... 2. Lease number appropriate. . . . . . .. ....... 3. Unique well name and number. .. . . . . . . . . . . . . . . . 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . 5. Well located proper distance from drilling unit boundary. . . . 6. Well located proper distance from other wells.. . . . . . . . . 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . 9. Operator only affected party.. . . . . . . . . . . . . . . . . . 10. Operator has appropriate bond in force. . . . . . . . . . . . 11. Permit can be issued without conservation order. . . . . . . . 'J/1 ~.~J~ 12. Permit can be issued without administrative approval.. 13. Can permit be approved before 15-day wait. . ENGINEERING FIELD & POOL APPR DATE ~ "1({t.ff?1 -- GEOLOGY R _~E2.__. ;!/:ffn ANNULAR DISPOSAL APPR DATE -- -- 14. Conductor string provided . . . . . . . . . . . . . . . . . . . 15. Surface casing protects all known USDWs. . . . . . . . . . 16. CMT vol adequate to circulate on conductor & surf csg. . . . . 17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . 18. CMT will cover all known productive horizons. . . . . . . . . . 19. Casing designs adequate for C, T, B & permafrost. . . . . . . 20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . 21. If a re-drill, has a 10-403 for abandonment been approved. . . 22. Adequate wellbore separation proposed.. . . . . . . . . . . . 23. If diverter required, does it meet regulations . . . . . . . . . . 24. Drilling fluid program schematic & equip list adequate. . . . . 25. BOPEs, do they meet regulation . . . . . . . . . . . . . . . . 26. BOPE press rating appropriate; test to .3S-Ö() psig. 27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . 28. Work will occur without operation shutdown. . . . . . . . . . . 29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . 30. Permit can be issued w/o hydrogen sulfide measures. . . . . 31. Data presented on potential overpressure zones . . . . . . . 32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . 33. Seabed condition survey (if off-shore). . . . . . . . . . . . . 34. Contact name/phone for weekly progress reports [exploratory only 35. With proper cementing records, thi§ì plan (A) will contain waste in a suit receiving zone; . . . . . . . (B) will not contaminate fr water; or cause drUling waste. .. to surface; / (C) will not impair m hanical integ~th~ well used for disposal; Y N (D) will not dam e producing J.9m'fation or impair recovery from a Y N pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N GE~ ENGINEERING: UICI COMMI~~ RP BEWŒO~ 1((1(- M DWJ '~ JDH ~. RNC CO L{) ~11ç"1'i ., c:\msoffice\wordian\diana\checklist Y N Y N Y N Y N Y N Y N N N N N N N N N N N N 6>N ~~ e!5 N œN .~ (5PN fi)N (y)N 6(;>N &N Y N Y Y \ '^' t(ú. c.. e (f'. (lro-'ø-'t¿t;.$- 3q ~ -I <7 ,..m- Y N Y N redrll ~ serv UNIT# wellbore seg //'¡::;;~ñ Commentsllnstructlons: ann. disposal para req ON/OFF SHORE ~ o o :2 o -I ~ ;::tJ ....... -I m ....... z -I ::r: ....... U') » ;::tJ m » Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Tape Subfile 1 is type: LIS **** REEL HEADER **** MWD H/ 7/ 6 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 00/ 7/ 6 107313 01 1 3/4" NaviGamma - Gamma Ray data \q~ ·o(ç 9 ~ ~51 \ LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 -------------------------------------------------------------------------------- ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! Remark File Version 1.000 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! Extract File: Header.las -Version Information VERS. 1.20: WRF.P. NO: -Well Information Block #MNEM.UNIT Data Type #--------- ------------- STRT.F 9620.0000: STOP.F 10140.0000: STEP.f 0.5000: NULL. -999.2500: CŒ1P. COMf?A."IY: ';-IE LL. FLD . LOC . rAn:' T . T . FIELD: LOCATION: CNTY. C:OUr~T"f : STAT. SRVC. TOOL. REF. DATE. API . -Parameter #HNEt·1. UNIT #--------- FL STAT2: SERVICE COMPANY: TOOL NAME & TYPE: JOB REFERENCE: LOG DATE: API NUMBER: Information Block Value CWLS log ASCII Standard -v~RSION 1.20 One line per frame Information ------------------------------- Starting Depth Ending Depth Level Spacing P.bsent Value ARca Alaska, Inc. 07 -32llJ.PBl Prudhoe Bay Unit 91 9 1 FÌ"IL North Slope D.1::;~!r::; Baker Hughes INTEQ 1. 75" NaviGamma - Gamma Ray 107313 18 Aug 99 500292252570 Descriptiorl ------------------------- FAPD.F DMF EKB .F EDF .F EGL ._ CASE.F 031 . -Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All Gamma Ray data (GRAX) presented ís realtime data. (4) Well 07-32APB1 was kicked off @ 9652' MD (8676' SSTVD) from the original wellbore of Well 07-22. 227 feet FEL 33 ll¡'~¡ 14E SECT. Tm1N. R}l.NG. PDAT. EPD .F MSL OL LMF . KB 62 KB 62 N/A N/A 107313 DI RECT IONP·.L ------------------------------- Field Location Section TOt,a1rT1Ship F{ange Permanent Datunl Elevation Of Perm. Datum Log Measured F~om Feet Þbove Perm. Datum Drilling Measured From Elevation Of Kelly Bushing Elevation Of Derrick Floor Elev~tion Of Drour.a Level Casing Depth Other Services Line 1 RECEIVED UG "'I 6 f)t\r\O' A -! DJU J Alaska OU & Gas Cons. Coromission Þ,nchorage (5) Well 07-32APBl was drilled to 10129' MD (8956' SSTVD) on Run 7 and later plugged back with cement. (6) The interval from 10103' MD (8956' SSTVD) to 10129' MD (8959' SSTVD) was not logged due to sensor to bit offset. (7) The data presented here may not be final and will possibly de depth adjusted to a PDC (Primary Depth Control) log later. (8) The Gamma Ray log has been depth shifted to match the Schlumberger MCNL Gamma Ray logged on 27 August 1999. (9) A Magnetic Declination correction of 27.44 degrees has been applied to the Directional Surveys. -Mnemonics GRAX -> Gamma Ray MWD-API (MWD] (MWD-API units) ROPS -> Rate of Penetratíon, feet/hour TVD -> Subsea True Vertical Depth, feet -Sensor Offsets RUN GAMMA 4 25.96 ft. 6 26.96 ft. 7 30.95 ft. DIRECTIONAL 30.11 ft. 31.11 ft. 26.80 ft. Tape Subfile: 1 67 records _ _ _ Minimum record length: Maximum record length: o Tape Subfile 2 is type: LIS 14 bytes 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------------- LCC CN WN FN COUN STAT 150 ARCO Alaska, Inc. 07-32APBl Prudhoe Bay Unit North Slope Alaska LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 -----------------------------------------------------------------------~-------- !!!!!! !!!!!!!!!!!!! Remark File Version 1.000 1. The data presented here has been edited from the field raw data. 2. The data has been depth shifted to match the PDC supplied by ARCO Alaska, Inc. 3. The PDC used is the Schlumberger's MCNL Gamma Ray data, dated Aug 27, 1999. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------------------- 1 GR. GRAX 0.0 2 ROP ROPS 0.0 * FORMAT RECORD ( TY PE # 64) Entry Type ( 1 ) Síze( 1 ) Repcode( 66) Data record type is: 0 ·~ Entry Type ( 2) Size( 1) Repcode( 66) Datum Speci fication Block Type' is: 0 Entry Type ( 3) Size( 2) Repcode( 79) Datum Frame Size is: 12 bytes Entry Type ( 4) Size( 1) Repcode( 66) Logging direction is down (value= 255) Entry Type ( 5) Size( 1) Repcode( 66) Optical Log-Depth Scale Units: Feet Entry Type ( 8) Size( 4) Repcode( 68) Frame spacing: 0.500000 Entry Type( 9) Size( 4) Repcode( 65) Frame spacing units: [F ] fndun c [F] 1.00000000 3 Entry Type ( 11) Size( 4) Repcode( 68) Number of frames per record is: 84 Entry Type ( 13) Size( 1) Repcode( 66} One depth per frame (value= 0) Entry Type( 16) Size( 1) Repcode( 66) Datum Specification Block Sub-type is: 1 Entry Block terminator. Summary ot entry types encountered: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 1 1 1 1 0 0 1 1 0 1 0 1 0 0 1 Rep Code 68 Count 2 Bytes 8 Sum: fndun a [F o 2 8 8 1.00000000 3 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth 10: F 2 Curves: API API API API Log Cry Cry Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GR MWD 68 1 API 4 99 995 99 1 2 ROP ¡vr;·m 68 . 4 995 99 .L ~ 'i ././ ------- 8 o * DATA RECORD (TYPE# O) 1014 BYTES * Total Data Records: 13 Tape File Start Depth Tape File End Depth Tape File Level Spacing Tape File Depth Units 9620.000000 10140.000000 0.500000 Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 66 1 datum Rep Code: 68 3127 datums Rep Code: 79 2 datums Tape Subtile: 2 20 records.. .. .. Minimum record length: 54 bytes Maximum record length: 1014 bytes 0 Tape Subfile 3 is type: LIS Sum: 2 8 8 fndun a (F 1.00000000 3 0 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth 10: F 2 Curves: API API API API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GRÞ.x ~·lD 68 1 4 4 99 995 99 1 -"- 2 ROPS Hlim 68 1 4 4 99 995 99 1 ------- 8 0 * DATA RECORD (TYPEIt 0) 1014 BYTES * Total Data Records: 13 Tape File Start Depth Tape File End Depth Tape File Level Spacing Tape File Depth Units 9630.000000 10140.000000 0.500000 Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 66 Rep Code: 68 Rep Code: 79 1 datum 3067 datums 2 datums Tape Subfile: 3 20 records... Minimum record length: Maximum record length: o Tape Subfile 4 is type: LIS 54 bytes 1014 bytes **** TAPE TRAILER **** MWD 001 71 6 107313 01 **** REEL TRAILER **** MWD **1 71 6 BHI 01 Tape Subfile: 4 2 records... Minimum record length: Maximum record length: 132 bytes 132 bytes End of execution: Thu 6 JLY ** 2:54p Elapsed execution time 1.16 seconds. SYSTEM RETURN CODE = 0 0 Tape Subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP 9620.0000 -999.2500 -999.2500 9620.500"0 -999.2500 -999.2500 9700.0000 32.2170 62.0000 9800.0000 31.0960 40.6130 9900.0000 28.7000 14.8000 10000.0000 28.0300 72.6550 10100.0000 80.7890 64.2000 10140.0000 -999.2500 -999.2500 Tape File Start Depth 9620.000000 Tape File End Depth 10140.000000 Tape File Level Spacing 0.500000 Tape File Depth Units Feet 0 Tape Subfile 3 is type: LIS DEPTH GRAX ROPS 9630.0000 -999.2500 -999.2500 9630.5000 -999.2500 -999.2500 9700.0000 27.0400 109.0000 9800.0000 27.0400 38.9130 9900.0000 29.9780 86.0500 10000.0000 24.4400 87.8000 10100.0000 57.3800 65.4000 10140.0000 -999.2500 -999.2500 Tape File Start Depth 9630.000000 Tape File End Depth 10140.000000 Tape File Level Spacing 0.500000 Tape File Depth Units Feet 0 Tape Subfile 4 is type: LIS RECE\VED ·ü'" 1; fif\0r: A'. b . b CU-j,; "I k ,...:1 & Î'1'':,c. cons. Commission Alas a 1111 \:.U.' C ".. Anchorage -- Tape Subfile 1 is type: LIS **** REEL HEADER MWD 00/ 8110 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 00/ 8/10 107313 01 1 3/4" NaviGamma - Gamma Ray data Il'1·ow1 'fJ- 'l5'l~_ LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 -------------------------------------------------------------------------------- !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 !!!!!!!!!!!!!!!!!!! Extrac1: File: HEADER. LAS -Version Information VERSo 1.20: WR;P. NO: -Well Information Block #MNEM.UNIT Data Type #--------- ------------- STRT.F 9640.0000: STOP.F 11695.0000: STEP.F 0.5000: NULL. -999.2500: C0ì'1 P . vlELL. [LD . LOC . CNTY. STAT. SRVC. TOOL. REF . DATE. API . -Parameter #t1NEM. UNIT #--------- FL SECT. TOviN'. N RZ\J'I G . PDAT. EPD .N U-1F _ FAPD. F DHF EKB .F EDF .~ COMPÞ.J."J'Y: WELL: FIELD: LOCATION: COUNTY: STATE: SERVICE COMPANY: TOOL NAME & TYPE: JOB REFERENCE: LOG DATE: API NUMBER: Information Block Value ~1~L~ log ASCII Standard One line per frame ,,:~n.-'i.-,'J..T -V.í:.t~..JJ..Vl". 1.20 Information ------------------------------- Starting Depth Ending Depth Level Spacing Absent Value ARCO Alaska, Inc ÜÎ-32.!l, Prudhoe Bay- Unit 919' Fi"¡L :North Slope }l~laska Baker Hughes INTEQ 1.75" NaviGamma - Gamma Ray 107313 26 Aug 99 5002922252501 Description 2271 FEL ------------------------- ------------------------------- 33 IIN 14£ MSL 62' RKB 62 KB 62' N/Þ. N/A 9652 DIRECTIONP'L Field Location Section To\".rr¡shìp Range Permanent Daturn Elevation Of Perm. Datum Log Measured FrDm Feet Þbove Perm. Datum Drilling Measured From Elevation Of Kelly Bushing Ele~..ration Of Derrick Floor EGL .F CÞ.SE. F 031 . -Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All Gamma Ray data (GRAX) presented is realtime data. (4) Well 07-32A was sidetracked at 98931 MD (8837' SSTVD) from the wellbore of Well 07-32AP81. Further details can be obtained from Elevation Of Ground Level C~sing Deptrl Other Services Line ~ RECEIVED AUG 1 6 20.00 AJaska Oil & Gas Cons. Cam:nission Anchorage the logs for Well 07-32AP81. (5) Well 07-32A was drilled to TD @ 11688' MD (8921' SSTVD) on Run 12. (6) The gap in the log from 10973' MD (8952' SSTVD) to 10984' MD (8952' SSTVD) was due to a depth adjustment after a tie in. (7) The section of the log from 10988' MD (8952' SSTVD) to 11100' MD (8948' SSTVD) was relogged due to bad decoding problems. (8) The interval from 11657' MD (8924' SSTVD) to 11688' MD (8921' SSTVD) was not logged due to sensor to bit offset. (9) The Gamma Ray log has been depth shifted to match the Schlumberger MCNL Gamma Ray logged on 27 August 1999. (10) A Magnetic Declination correction of 27.44 degrees has been applied to the Directional Surveys. -Mnemonics GRAX -> Gamma Ray MWD-API [MWD] (MWD-API units) ROPS -> Rate of Penetration, feet/hour SSTVD -> Subsea True Vertical Depth, feet -Sensor Offsets RUN GAMMA 8 26.93 ft. 9 31.99 ft. 10 32.19 ft. 11 31. 51 ft. 12 31. 31 ft. DIRECTIONAL 30.98 ft. 27.08 ft. 27.28 ft. 23.92 ft. 23.72 ft. Tape Subfile: ~ 11.. records... Minimum record length: Maximum record length: o Tape Subfile 2 is type: LIS 14 bytes 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------------- LCC CN WN FN COUN STAT 150 ARCO Alaska, Inc. 07-32A Prudhoe Bay Unit North Slope Alaska LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 -------------------------------------------------------------------------------- !! !!!!!!!!!! !! !! !!! Remark File Version 1.000 1, The data presented here has been edited from the field raw data. 2. The data has been depth shifted to match the PDC supplied by ARCO Alaska, Inc. 3. The PDC supplied here is the Schlumberger's MCNL Gamma Ray data, dated August 27, 1999. *** INFORMATION TABLE: CIrO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------------------- 1 2 GR ROP GRAX ROPS 0.0 0.0 * FORMAT RECORD (TYPE# 64) Entry Type ( 1} Size( 1} Repcode( 66} Data record type is: 0 Entry Type( 2} Size( 1} Repcode( 66} Datum Specification Block Type is: 0 Entry Type( -3} Size( 2} Repcode( 79} Datum Frame Size is: 12 bytes Entry Type ( 4) Size ( 1) Repcode ( 66) Logging direction is down (value= 255) Entry Type( 5) Size{ 1) Repcode{ 66) Optical Log Depth Scale Units: Feet Entry Type( 8) Size( 4) Repcode( 68) Frame spacing: 0.500000 Entry Type ( 9) Size( 4) Repcode{ 65) Frame spacing units: (F ] fndun c (F] 1.00000000 3 Entry Type ( 11) Size ( 4) Repcode ( 68) Number of frames per record is: 84 Entry Type( 13) Size( 1) Repcode( 66) One depth per frame (value= 0) E~try Type{ 16) Size( 1) Repcode( 66) Datum Specification Block Sub-type is: 1 Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 1 1 1 1 0 0 1 1 0 1 0 1 0 0 1 Rep Code Count Bytes 68 2 8 Sum: 2 8 8 fndun a (F 1.00000000 0 3 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth 10: F 2 Curves: API API API API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cis Mod 1 GR MWD 68 1 API 4 4 99 995 99 1 2 ROP ~·lD 68 4 ~ 99 995 99 1 ~ .L ------- 8 o * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 50 Tape File Start Depth Tape File End Depth Tape File Level Spacing Tape File Depth Units 9640.000000 11700.000000 û.5ÛÛÛÛû Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 66 Rep Code: 68 Rep Code: 79 1 datum 12367 datums 2 datums Tape Sub file: 2 57 records... ---------------------------------------------------------------- ODEP CNAM DIMT CHAN MNEM *** INFORMATION TABLE: CIFO !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 1. The data presented here is the unedited field raw data. -------------------------------------------------------------------------------- LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 150 ARCO Alaska, Inc. 07-32A Prudhoe Bay Unit North Slope Alaska LCC CN WN FN COUN STAT -------------------------------------- VALU MNEM *** INFORMATION TABLE: CONS 1024 MWD .001 **** FILE HEADER **** 132 bytes 132 bytes Minimum record length: Maximum record length: o Tape Subfile 4 is type: LIS 2 records... Tape Subfile: 3 1 3/4" NaviGamma - gamma ray data 107313 01 **** TAPE HEADER **** MWD 00/ 8/10 LIS Customer Format Tape BHI 01 **** REEL HEADER MWD HI 8/10 54 bytes 1014 bytes Minimum record length: Maximum record length: o Tape Subfile 3 is type: LIS 0 Tape Subfile is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP 9640.0000 -999.2500 -999.2500 9640.5000 -999.2500 -999.2500 9700.0000 32.2170 62.0000 9800.0000 31.7670 37.8000 9900.0000 28.2750 18.9000 10000.0000 36.1920 71.4190 10100.0000 36.9130 66.2790 10200.0000 64.4670 92.3000 10300.0000 92.1140 11 . 9000 10400.0000 85.7010 14.3000 10500.0000 62.0310 40.4000 10600.0000 54.8070 38.7000 10700.0000 39.0610 58.4000 10800.0000 30.9660 43.5160 10900.0000 33.9980 97.2000 11000.0000 85.7970 29.9670 11100.0000 45.4740 80.0000 11200.0000 74.6240 51. 7280 11300.0000 61. 2150 45.0000 11400.0000 75.7900 62.0000 11500.0000 63.8380 80.7630 11600.0000 69.9600 76.5000 11700.0000 -999.2500 -999.2500 Tape File Start Depth 9640.000000 Tape File End Depth 11700.000000 Tape File Level Spacing 0.500000 Tape File Depth Units Feet 0 Tape Subfile 3 is type: LIS 0 Tape Subfile 4 is type: LIS DEPTH GRAX ROPS 9640.0000 -999.2500 -999.2500 9640.5000 -999.2500 -999.2500 9700.0000 27.0400 109.0000 9800.0000 27.0400 38.9130 9900.0000 49.7640 86.0500 10000.0000 26.0130 87.8000 10100.0000 41.8470 65.4000 10200.0000 78.6730 46.7000 10300.0000 108.5760 20.4380 10400.0000 87.4500 18.6000 10500.0000 69.9600 11 . 5000 10600.0000 52.4860 36.5040 10700.0000 40.8100 56.2000 10800.0000 44.3080 58.9580 10900.0000 33.8660 116.1000 11000.0000 84.7160 19.1330 11100.0000 44.9270 80.0000 RECE\\/ED 11200.0000 99.6930 8.5640 11300.0000 66.4620 43.2530 11400.0000 53.6360 59.6900 11500.0000 68.7940 90.0000 AUG 16 2000 11600.0000 55.9680 62.0000 11695.0000 -999.2500 -999.2500 . ;~ï & r'rl~ cons Commission AlasKa U! \;J.el""· Tape File Start Depth 9640.000000 Anchoïage Tape File End Depth 11695.000000 Tape File Level Spacing 0.500000 Tape File Depth Units Feet 0 Tape Subfile 5 is type: LIS NOTICE The following well logs and oversized documents have been placed in offsite storage. If you would like to view the original documents, please contact the AOGCC librarian. AOGCC 3/4/2005 \-":'\"',', \'1 " · 0<09 r&íi8 BAKER HUGHES IN~r~~Q \V~ U +' C C ::J (tJ CD X. (tJ (J) Q) 0 IV CD 0) «0 (tJ N..c..cx OM'U+'ID U¡I :J L (tJ « a:.......LO-O) <C(S)Q..Z«::J ::n ::J1 C ::n L «J 'U.....CD..... 0.-- c.... C E-ID:J«U:J o CD·- 0 ..... 0 U :::t LL U .ff) U GAMMA RA Y .Jj Company ARCO Alaska, ,We I I 07 -32A ¡Field Prudhoe Bay ~ounty North Sloþe tate Alaska ountry USA ---~----~---- ell Location: 919' FNL 227' FEL Inc. Unit Other Services: DIRECTIONAL ~;::9:;:~::1 [::~r~;~l: L::'~J~ _____ Log Moa.sur:ed From 62' RKB ___ Above Per.m. DdlumElev. KB 62' Depth In 9799 ft. MWD Sturl19 Auc.l 99 Perm. Datum Elev. OF N/A I DQ th O~.16ea ft.. MWD End 26 ~~ 99 MS-!~-::=-_ ~ea ~ed/GL N/~J --, -- .... ,_. --- ._~. -" .. .'-. -·-'~~~~·:lì To _J! 3286 f t. l¡ 9492 f t. 9840 f t. '-,...---. .'...' - _. _.~_. "_.,.....-...-..,,.__.~.'-_.~--,--. Bore Hole Record Hole Size Fro~ 3 1/8 in. 96t.0 ft. To 11688 f t. Dr i I I i n 1:240 10.75 7.63 4.5 Record Size From in. Sur face in. Sur face in. Sur face R I. ,I !¡ !I ]1 'I II II Ii I; :1 ·1 ' II :! '·~I ._-J 187313 I! .J Contractor ffD _._...._.._.. . ". ..__;,~. R i.9 ~'t~þQr.s.3$_ AUG 1 6 2000 N aJ::Jo C ~__.f\J _a ~~_~ 1:600 Alaska Oil & Gas Cons. Commission Anchorage MEASURED DEPTH Com an Rep. FIELD PERSONNEL FINAL PRINT Garry Goodrich Oan Fox Rahul Madara u Steve Bradley Steve Sturqcn --=r:::b II ,,_-" ...: 0,. ,~, 'h ,_._..,~, ,,, ..,"~.._.;.._ ._, ~'~,,~._. "~."""~""'"",,,,.", .1 <1 C\, D~" \ÎJ~ .r= I W&íi BAKER HUGHES IN~r~~Q . ' ',' GAMMA RAY ARC a Alaska, Inc. 07-32A Prudhoe Bay Unit North Slope . A I aska USA ;, :, · .' DIRECTIONAL il · ~ I :1 , Ii '1 J :1 .¡ II I I 'I 1:1 Location: .919'.. ·FNL . 227~ FEL Other Services: . ·1 , Log:Moeas~ed From 62' RKÐ Above PeJ7m.. Depth In:;. 9799 .£t. MWD St.~rt 19 Aug 99 Perm. I . De ..t h OutS1 690 .ft. MWQ' End' 26 Auq 99 MS L J4E Da.tum E lev. . KB 62' Da t \1rn E I e V . OF N / A Sea Bed/GL -N( ^ . _ ,,; Contractor Record Size· Froht Surface Surface Surface .¡. Ii l' I' Toil 3286 ft. :; · I 9492 ft.. :, 9840 ft. Bore Hole Record Hal e' S rze' From 3 118,i¡~~ 8849 ft. Nabors Alaska R i 9 N~bors " ,I II -.1 3S . -'-"'1 II ·1 ,I .\ 1:240'~ ÄUG 16 2000 1:6 00 A1ãska Oil & Gas :Cons. Commission ..' Anchorage TRUE: VERTICAL DEPTH . ¡ FINAL PRINT Company Rep. F.i.J::LD PERSONNEL Garry Goodrich Dan Fox Rahul Madara u Steve Steve Job # 107313 \qq~o(o9 I\; ~ r&íí. BAKER HUGHES IN~r~:Q GAMMA RAY l I I I \ --,. Company ARCa Alaska, Inc. 1 . Well 07-32A I: u +' :\ c .- Field Prudhoe Bay Unit ...... c :::J County North Slope . nJ ~ ~ State Alaska ~ m co 0 Country USA nJ - - cD(/) « « 0 ('() Well Location: Other Services: N ..c. ..c ~ 0 M ~ +' CD 919' FNL I U I :J L ('()« r cr: r--- L 0 - (/) 227' FEL DIRECTIONAL «(5;)0...2« ::.> ::n :Ja I c :JI L nJ ~+'ID+' \1 Q.- - C +' C API Numl:;ü r I Soe t. 1 Twp. Ran(jü II E-cD:JctJ:J I II o CD·- 0..... 0 1500292252501 14E II U:J:UU(/)U 33 11 N Log Heas urnd From 62· RKB Abovo Po 1- m. Datum Elev. KB ~. I Depth In 9799 ft. MWD starl 19 Aug 99 Po r m. Datum Elev. OF N/A J De nt. h Out. I 1688 ft. MWD End 26 Au.a 99 MSL Sea Bed/GL N/~ -.. ~.",._. __',_n, ""._ "'..........'_.__ 0. ._.... '..,....,,_.........._ ." ...,.. ,-...'-_.-,". -.. ----.---- Dr ill in Contractor Na_bqr s .._~ I a__~_Jc;.~_ Rig N a b.9E s _~~__ To 11 3286 ft. I I 9492 f t. " 9640 f t. I il Ii 11 \' I \ \ I ...... --......-.- ..- - ..... . ..- ...' .", Bore Hole Record Hole Size From 3 1/8 in. 9640 ft. To 11688 ft. 1B.75 7.63 4.5 Record Size From in. Sur face in. Surface in. Sur face , I 1:240 . 1:600 AUG 1 6 2.000 Alaska Oil & Gas Cü;~s. Commission TRUE VERTICAL Anchorage DEPTH FINAL PRINT Com an FIELD PERSONNEL Garr Goodrich Dan Fox Rahul Madara u Steve Steve Job # 107313 " .. \. :~ r ~, ...;..... ... ~ ~j Jt...w_ J.~"~..l.. ~IE"II'JfJtiI!IIIImtr. U_laæ&1í. 11&11'-'1 .~. !~ lqe,·o~q 1~: .' ". \v .,' r&ii. BAKER : HUGHES INTEQ GAMMA RA Y ~ Ii II 'II ===:::!J:! ,I u c: tV 01,0 œ(J) «<!o m N.c:.c:.:trC OM1J....1D U I ::J L ('0« 0.:" '- 0 - (f) « (S) ,a... Z <C :::J Other Services: DIRECTIONAL 14E LoC7 ~a.sur'~d '. From 62·' RKB Abov~', Perm.:Dalum E J ev. KB _~ :In:9799 ft. ,HWD start 19 Aug 99 Parm. Dt'1t urn EJ ev. OF NfL- Oul i11608 ft.. MWD.End 26 Aug 99 MSL Sea Bed/GL N/~.__ ~¡ I, 1:'1 ,1 :1 t I ¡II II~: ~ -~.-.- 3 To 3286 ft. 9492 ft. ,9640 ft. I \,' l i:,1 I :11 t' ,III :} ,11\ ~I ; ~: :) ( ,) ED '00 R i 9 Nª_bQr s_ 35_ . 1:240 '1:600 A1aska OU & Gas Cons. ~ommissian AnchQr~9.e ':) MEASURED DEPTH Steve Steve Job # 107313 ; ~ \1 ,I .~ :1 ;j ;) '~, ~ ;j fl ¡¡ . FINAL PRINT i;þ. (~ ._._lS'1 . Olo~ ~ r~íí. . BAKER HUGHES IN~rl(Q GAMMA RAY I ¡ j Company ARCa Alaska, Inc. ·-~I" ü..... We I I 07 -32APB1 I, c c Field Prudhoe Bay Uni t Ii ~ County North Slope II ro Q) State Alaska II ~ ~~~ Country USA ~ I~ I ~ ~ ~ We I I L 0 cat i on: Õth-e r _.5 e r v i ~~ÎI 81<7 -g t: ~ <t: 919' FNL 0:: Ir--- L 0 -1(1)1 2 7' FE <C Itt) a.. Z <t: I::) 2 L 0 I REC T IONAL. \ :J) ::n I C ::n L II ro "D"'" Q)..... _________u_____ ___._____ ___ ___ ______ " ~= a, § ~ § API Numl~'" SpeC. 1 Twp. [ H.i\II<J'; :1 o Q).- 0 ...... 0 II U ::I_lb._!-) ill.!:J__ ~029~252570 .33 _ 11 N ---.!-~ ------------ll Log M<¡~,).:;ur()d Ft.om 62' HKB Above P(:r m. Du.tum E lev. KB 62' I Onpt.h In 9669 ft~-;~D st~-~-~U9 99 Per Ill. Datum Elev. OF -Ñ(ð~--= JI Dn )t. it Out. j 0129 ft. MWD End 10 Au"" 99 MSL Sea 8ed/GL Jifð_u ---=========.=..-===..7..=.=.~---- ~:.-=---==-=..:..~-=~_:~.::=-=_=.__:.....::_=:.::....._====::.=.._~';"=_::__.==_==__~_::====__=.::._:...::::= .J .~----_. B~~;~ ~1 ~- i-~ ~~-e ~ .~~~====~.==~~-::~-::=~-: E~~~¡~LÀ~~~ ~~(::~_. __=--:~:-_:==-~~=~] H ~_Le S i ._~~_ Er:..~ rn To ____ . _~ 5 i n9..2~ z e F r 0 rn _____._. L~_ ¡ 3 1 /8 in. 9668 f t. 1 0129 f t. 10. 750 in. Su r fa c e 328 b f t. 'I . I 7.630 in. Surface 9432 ft. :¡ I, 4. see in. Sur face 9640 f l. I! ii I -- -.---- ._------ I ¡: r\ Ii R-E-E-E-~ E-tTRi--- N a b-~;-is---·1 ¡ - .. _ . .-. . ...- ... .n . ~.__"_'_~~~._,=_.'"'___'__'_'_~ '1 II AUG 16 2000 Ii I, ! ~ II Ii ii II L ------- j; Brad I ell ,: ~-f~~e73:Jj Steve Dr ~J!2£L Con !.r'ac tor Na.ºqr_~_. .A.'-ªs~._ª_.. 1:240 1:600 Alaska Oil & Gas C.O;¡s. Commission TRUE VERTICAL Anchorage DEPTH FINAL PRINT ---------..--------- C 0 m p a !::!.Y..~:...-º~ r r'y Goo d r i c h FIELD Dan Fox PERSONNEL Rahul Madara~ ~ [;;}-1. l:lq· olQ~ r'.. BAKER HUGHES I N'f(1:Q GAMMA RA Y -------lfk- -~--..,..---:_:_=.:c==_=._==::=Jj ,--..- -.------ --.-----=:-:- -'J I I . U ..... C C :J .. rn CD .,:,l ro Q') .-HD 0 roeD -o...CDUJ ««0 co N.c.cx o M ""0 -+... en UI:JLn1<t 0:......... L O-{J) «{'S;)o...Z«::J Company We II Field County State Country ARC a Alaska, Inc. 07-32APBl Prudhoe Bay Unit North Slope Alaska USA '''-- --" -.-.--.----. We I I Loca t i on: 919' FNL 227' FEL Other Services: DIHECTIONAL :J) :J) C ::Jt L ro ""0 ..... Q) +J !~~~~~ ::9:::::L~~~::;J;;~ _________n______ Log MUl.\sured From -.!!.? RJ<.º_______ Ahove Por.m. Dutum E lev. KB ..§.?.-:.,___ Dp.plh In 9660 ft. MWD Slarl14 Au9' 99 POn11... D..ll.1I11 [lev. OF _N/A__ De It. h O~_1 29 ft. MWD End .18 _~!:!9......21L_~~______ ~-=-~:-_.8e~~~_~=~~_:=::_ - ~~~~ i!f ~~.-R~~~~~-~ft-.--- d~29 - f t~ ~l~~t{:~~~~-O~~~a~~e - - ~à:6~-f~=11 7.630 in. Surface 9492 ft. I 4.500 In. Surface 9G48 ft. Or Î I I i n 9 Con t r aZto---':- N¡¡þ () r ,,_ Äla§ 1s.ª" _ R-{'-£-fl"~~: -Ä i 9__=lifôb or:,s-=-Is~____ 1:240 1:600 AUG 16 lOOO . . Alaska Oil & Gas Cons. CommIsSIOn MEASURED ~-. DEPTH FINAL PRINT Company Rep. FIELD PERSONNEL __________,._ ____, _'______ 0'- ,_____ _____'___"_j Garry Goodr i ch Steve Brad I eY----J-------------- Dan Fox _ ___ Job # 107313 Rahul Madara u ---.----- ~ t\V /'; "~"""~~;.I.~.~""~,;,\:þ'::,~"¡,..Io~U-:.,~,~~.........:.,..":~~,,.',~,",,,,,..:..~"""":"_..~,...~";:....L:.,I'~':':"~~''':~'~'.'~~~:.,~',;''''I·'''''.,,,,I'~"'''~'' ;¡ iii i,I i 'i~ '1.1 'I) 'i,! :,:,1! i,l ;I::! t¡ 1:1 'ii 1'1 li'¡' . II~' Iii 1'1:1 1;I,i l¡il. ilii II1I ~l li~ ;IJ .1,1 II~ ~i~ '1\11 ~¡I? 1,1/ lì~ I~I 1')£ I¡III 1'1 j~ It¡ n .1\ tj:/ ,1111 ¡"',\ ¡~ '1~ 1/\ II W 1"1 'I'! itl h~ I¡~ WI, "It li,i,1 till \t'l I,fl! ¡,III iÎ~\ lili Ip IJ¡I f11' I"" ..I! '11 1.'¡\1 'îi¡ r1h I¡¡\ (~I\ f\li; , 'I J!, I¡p lill . :"[1 \I¡:' rl¡) \1i\ \I I' 'Il:\ 'Y,' I:¡ t\i) ~;i! Ii:' hi) I)ì\ tJ" 1) i ()\ ~', I, ~ :Iìl ,'I:,'¡ ,;~r&íí. . BAKER HUGHES I NTEQ ,i ' GAMMA RA Y Company We II Field County State Country We I I ARca Alaska. Inc.. . 07-32APBl Prudhoe Bay Unit Nor th ',' S lope Alaska USA :)'t ", ':A C :JA' .L' to -0..... CD....., I, , 0.- - c'..... ,r: E - GJ:J '(O::J: o GJ ~ 0'" "'0 : Log Mc~S ~'r~d ,), .. ", Depl h 1;n,. 9~6a ft. De t h out'S 0129 £t 14E 'D~tum E lev.. KB:'; 62' Pe rm.. . Da l um E I ev .. OF N I A MaL ¡ Sea Bed/GL N/A Bore Hril~jRecord Hole Size From 3 1/8' :'jn;"S668 ft. . ft. ft. 3S 1:6 OO¡\1aska Oll· 8< Gas Cons. CommissIon ,.' ',. ~ :;'. ~.::. : ' ;'.. ..Anphorage; I ,. ~ :'. MEASURED; ,:J,DEp·TH,.: FINAL PRINT :) ·Steve Job. 11 107313 ··'~~'::'."':':'_"N,.._,:,:,:~:,.~.~.~~~'::::-=::,:,:':~I:~"'~.--:-:~:":"'-:~::-ë_:'~,.,~ ,..__.:::.......:.:.:.~" _- _~__ __ ~._'.. "J \1; ..': ·::r,cií : ~ BAKER HUGHES '\ INTEQ'''···· D~ GAM~A RA Y o c: Company We II Field ounty State Country ARCO Alaska, Inc. 07-32APBl Prudhoe Bay Unit North Slope .Alaska USA '.. [' J .X'. ('0 (I) .-I mo (Om <~~VJ(O N.c.c..x: OM'U....C'O U I :J.L co 4: 0:....... LO - (f) «<s.>o... z «::;) ; (, ,I Loca t ion: 919' FNL ~:' 227' FEL Other, Servi ces: DIRECTIONAL " " . ': ,," ',' Log Me~s'ure~:IFrom' 62- ·'RKB :In '. ~6.69 ft.. MWD start 14 Out! 01 9 ft.. MWD End :'19 Abo.";'e 'Pe r In. 1'4:£ ' 'Da.turn E lev. 'KB 62' Datum Elev. OF N/A Sea Bed/GL N/A . Perm. HSL· To 3286 ft. 8492 ft. 9640 f t. I " - I 35 1:24()I~i" ;,-,' 1:90,Q ~a~kaOil'&GaSCons.Commi~on' ':,.~ :\~'.1'· .:~.:' '., ./.. ~;,' .':'; :~' ','. " Anchorage TRUE. '\/ERTICÄL :.: FINA. L'.-PR., INT '".,DEPTH:·:,'..; ":,. 'I; Steve Bradle Jo~ # 187313 ;# (;;)-z '.c: ë ~ Q') 0 ro 5 "O.~ a. om om8E m ü: .9 ~ Lo in Date Run Number Depth Driller Schlumberger De th Bottom Log Interval Top Log Interval Casing Fluid Type Salfnit Densit Fluid Level BIT/CASING/TUBING STRING Bit Size From To Casin /Tubin Size Wei ht Grade From To Maximum Recorded Temperatures Logger On Bottom Time Unit Number Location Recorded B Witnessed B u ~ 2: ...J ~ W Z LL. 0 W ~ f'. ~ a. C\I 9 m C\I ~ W oð 0 Z (/) 0 ...J M ...J 0 I I Z ~ a. ~ b: 0. LL. 0 ~ ::> Õ) en 0 0 a: a. 9 Z a. ã) ci OJ SLIM CEMENT MAPPING TOOL SCMT-BB I GAMMAY RAY I CCl 10-JUNE-2003 919' FNL & 227' FEL SURFACE LOCATION Elev.: K.B. 61.85 ft G.L. D.F. 61.85 ft Elev.: 0 ft 61.85 ft above Perm. Datum Permanent Datum: Log Measured From: Drilling Measured From: M.S.L. R,K.B. R.K.B. API Serial No. 50-029-22525-01 10-Jun-2003 ONE 11664 ft Section 33 Township Range 11 N 14E 9720 ft 9450 ft KCL WATER 8.5 Ibm/ al Oft 4.500 in 12.6 Ibm/ft L-80 9558 ft 11 660 ft , "',~:,;:; ,:~;~'; ':>:(;1:1.': C:ons. ,~ r~ ::\ ~¡ ·':h.nr ' 22:00 10-Jun-2003 2158 PRUDHOE BAY B.H.BOEHME B.McNERLlN