Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout191-100& LO~ATION CL E~(-~32¢CE REPORT State of Alaska spud: ~ ~ ~__~~__, Tn: .-~oe.e casing si=s, w~., de~, S~: Cs~: ' - 133/0" 6~,~J-3'~ Compie=ad ~/3oos~ .~eview the well file, and-c_~.~: an pluqq~g, well head s=a=us, and !oca=iun c!ear~ce - prov~e loc. clear, code. , ,, J " ,, _ Well hea~ =aC o~f: ~, .. ~rker 9osc or place: , Clearance: ~o Conclusions: i i i i Cade ~ ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-319~. PHONE: (907) 279-1433 TELECOPY: (907) 2767542 November 3, 1992 Janet Bounds Unocal P O Box 190247 Anchorage, AK 99519-0247 Dear Ms Bounds: As we discussed on the phone October 28, ^OGCC will be reassigning APl numbers for the wells listed below. In order to accommodate the revision of Unocal's records, we will not announce these changes to the public until the first week of December, or until you advise me that all the necessary changes are made. Give me a call if you would like to discuss this matter further. Well Name Permit # Old APl Number New APl Number Granite Pt St 17587 #3 66-52 ' 50-883-10031 50-733-20437 Granite Pt St 17587 ~t 89-30 50-883-10032 50-733-20438-90 Granite Pt St 17587 f/6 89-103 50-883-10034 50-733-20439 Granite Pt St 18742 ft8 67-36 50-883-20008 50-733-20440 Granite Pt St 17586 ~ 67-54 50-883-20009 50-733-20441 Granite Pt St 18742 #34 79-17 50-883-20009-01 50-733-20441-01 Granite Pt St 17586 f/41 91-45 50-883-20009-02 50-733-20441-02 Granite Pt St 18742 #14 79-33 50-883-20010 50-733-20442 Granite Pt St 18742 #20 68-16 50-883-20012 50-733-20443 Granite Pt St 18742 #20RD 91-20 50-883-20012-01 50-733-20443-01 Granite Pt St 17587 #5 68-24 50-883-20013 50-733-20444 Pretty Creek Unit #2 79-9 50-283-20022 50-283-20022-90 Nicolai Creek Unit fi4 9'1-100 50-283-20033 50-283-20033-90 Lewis River D-1 89-72 50.283-20068 50-283-20068-90 Trading Bay Unit G-18DPN 83-135 50-733-20160 50-733-20160-90 Yours truly, Robed P Crandall Sr Petr Geologist /jo MEMORA DUM state of Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION TO: Lonnie C S 5 ~5/~:~"~-- DATE: Nov. 13, 1991 (Revised) Commiss ion~r ' FILE NO: MTM\UNOC912 TELEPHONE NO: THRU: FROM: Michael T Minder ~,~~. Sr Petr Engineer SUBJECT: Wellbore plugs Unocal Nicolai Creek Permit No. (~3-~ 9f Exploratory Sec 32,TllN,R12W,SM Friday. September 6. 1991: I traveled to Nicolai Creek Unit to witness the plugging of well #4. Two plugs had been set prior to my arrival. Plug #1 was set through a 2-7/8" tubing cement retainer at 7009' (perfs at 7083-87') up into 9-5/8" annulus with 108 sx of class Plug #2 was also set through tubing retainer at 4240' and squeezed through perfs at 4294-98' with 108 sx of class I was met at the wellsite by Unocal representative Marry Lynch. After replacing a packoff that had washed out, we were able to get 2000 psi on the #2 plug saturday afternoon, but it bled down to 1850 psi in 30 minutes. The pressure had been applied through tubing and out an open gas lift mandrel at 2054'. The mandrel was located below the old surface plug and above the #2 plug. When we pressured up between the two plugs, the 1000' surface plug broke dOwn and a small quantity of gas and oil was observed at the surface. Unocal perforated the tubing at 996-1000' and circulated one barrel of crude oil. Number 3 plug was then set: a balanced plug from i000' to 50~ inside the 2-7/8" tubing with a coil tubing unit.. The plug (5.5 bbls of 15.8 ppg class "G" cement) was in place by 01:35 Sunday; however, it would not set up. After several futile attempts, the plug began to set and we were able to tag it with 1000 lbs at 357' after a 16-hour WOC. .The #4 plug was set to the surface at 21:15 with 26 sx of class cement. I saw it placed, but did not wait for it to set up. I asked Marty to take photos of the P&A marker in place before they backfill and send them to our office. In summary, I witnessed that the abandonment procedures were performed satisfactorily on Nicolai Creek #4 well. Location clearance will have to be performed later. 02-00lA (Rev. 6/89) 20/ll/MEMO1.PM3 STATE ()F ALASKA ~SKA OIL & GAS CONSERVATION CO~ ,SION Plug & Abandonment Re~ort Date Company Repr ~/~ ~Z~./ ~_ y A/C.4 Drilling Permit Sec. T-R ~ Total Depth ,;~'~/-/~ Elevation Cas lng: Mud Wt. Drive Pipe Conductor L ;,eu,,-m ~. "O.D. Set at 4~ Ft. w/ ~4~4~'- Pene. "O.D. @ .~)~ Ft. Surface /~'~ "O.D. @ ~l~Ft. ~'70! ~ "o . "O.D. @ /0 70~ Ft. Production .D. @ ?0/~ Ft Plugging Data: 1. Open hole plugs: ! ,;' / ,7,-, ,lo rroo , , (,No,, 2. Open hole isolation plug: 3. Perforation plugs (if any): .A/O~.4~" ....... ~ AnnulusAplugs (if any): 5. Casing st~ plugs, 7S 6. Surface plug ! -/ooo (,,/,,,,. w) Casing removal: /~0~-- "casing cut at "casing cut at ' "casing cut at ' : · KB - 15' ./NIcoLA! CREEK CURRENT #4 SPUD 12-02-69 ABDN 11-27-71 301C~ I 4~ 20"" C3g I 308, CIA'D:ItN 7~0 ~ ~/~ · . . .' , . · 10.270· 1~1~ ~- 10,540' 1~ l,I ~ 130 KB = 15' NICOLA! cREEK '#4 PROPosEZ) SPUD -----' . ~ ABDN 11-27-71 ~ 3/a- 54_,,~ i I ~ AT le, z 7/,'. r,.~, N-CO. E~. TO 10.2'~ 1~4~ 1~1D' -- 1~ 4 ~ . ~xxxxxxxi CMT ~ F/ 11,6,10' -- 11,800~ (GM.(~) GRB 5/'~6/9'~ ALAsKA oIL AND GAS CONSERVATION CO ,MISSION 0 R 161 N/% L WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL r-~ GAS ~ SUSPENDED ~ ABANDONED~[ SERVICE I--I i~ N{ime of Operator 7. Permit Num~._100 nlon Oil Company of California (UNOCAL) 3. Address 8. APl Number P.O. Box 190247, Anch., AK 99519-0247 50- 4. LocatioD of well at surface 2206'~, 297'~'I~ =-u.,. Sm Cor Sec 29, TllN, R12W, SM 9. Unit or Lease Narrke · -'-- _ . . Nlco±a~ Creek At Top Producing Interval 10500 ' M'D, 10. Well 364' S, 2323' W of NE Cor. Sec. 29, TllN, R12W, SM Nu~rcolai Creek #4 At Total Depth ( 12,744 ' ) 11 Field and.P.ool , . 947'N~, 2988'~ ~ ~ ~.~. Sec. 32, TllW, R12W, SM NlCO±a[ Creek 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 15.4' ADL 17585 12-02-69 03/22/70 11/27/71 & 9/9/91I IfeetMSL 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost 12,744, 11,957 23'/23' YES i--I NOr-] N/A feet MD N/A "'~2. Type Electric or Other Logs Run CBL/CCL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSIZE WT. PER FT. GRADE TOP BOTTOM HOLESIZE CEMENTING RECORD AMOUNT PULLED 30" 12' 52' Driven Driven 20" 85# S-55 10' 308' 26" 750 sacks 13-3/8" 54.5# J-55 8' 2134' 17-1/2" 300 sacks 9-5/8" 47#. N-80 6' 9018' 12-1/4" 1700 sacks 7" 29# N-80 8701' 10,700' 8-1/2" 240 sacks 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD · interval, size and number) ' SIZE DEPTH SET (MD) PACKER SET {MD) 2-7/8" 10,270' 10,197' TOP BOTTOM HOLE MD TVD MD TVD SPF SIZE · 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10~00' 9896' 10,500' 9896 2 1/2" DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10510' 9905' 10,540' 9933 4 1/2" 10558' 9977' 10,558' 9977 2 1/2" .., 27. pRODucTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) 4/10/70I Flowing Date of Test Hours Tested PRODUCTION FOR el L-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO ...4/10/70 24 TEST PERIOD e Trace N/A 470 N/AI N/A Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE .... 28. CORE DATA ,, Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or wate r~ Submit core chips. R£C£1vEo £4 Alaska Oil & Gas Cons. Commissiem Anchorage.. -- · Form 10-407 Submit in duplicate ,~0 Rev. 7-1-80 CONTINUED ON REVERSE SIDE NAME GEOLOGIC MARKERs MEAS. DEPTH TRUE VERT. DEPTH 30. FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 31. L~STOF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (D.F, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 KB = 15' , (' NICOLAI CREEK CURRENT SPUD 12-02-69 ABDN 11-27-71 RE-ABDN 9/9/91 CBifBNT FROM 91' TO SURFACB 30" CSG · 46' 26' HOLE 20" CSG · 308' CMT'D W~ 750 SX 17 1/2" HOLE 13 3/8" 54.5# · 2134' cur~ w/300 sx 80 PCF CUT IN ANN F/ 7800' - 9409' CUT IN '1130 F/ 7100' - 9409' 9 5/8'* 43.5-47~ · 9010' 2 7/8", 6.5#, N-80, EUE, TO 10,270' 7" 26-20# F/ 8701' - 10.700' ~ w/240 sx 'rD" 12.744' 80 PCP MUD · · : TUBING STUB AT 98' CBIfBHT IH TUBING 1¥ 1100' - CRMENT IH 9-5/8" X 2-?/8" ANN FROM 100' - 890' TUBING PUNCH AT 996* G.L. MANDREL 0 2,054 (NO VALVE) TUBIHO PUlqCH 3992' & 4294,' CgifglqT PLUG 3992'-' 4~294' T~,,BDYIqB-MRRI~ '*A'* RBT' AT'4220' G.L. MANDREL O 4,1576' 01. UANDREL · 6,475' TUBING PUNCH 6784' & CBIfBHT PLUG 6786' - 708,~' ?BLBDYHB-MBRL& "&" O.L. UANDREL · 8,444' 2 1/4'* HOLES · 9409' TYPE O TB0 PLUG · 9410' 'IYPE F 'lBO STOP · 9412' F~SH (ohs xx PLUG)'o 9413' G.L. MANDREL · 10,158 OTIS CX UANDREL 0 10,192' BROWN H-1-SP PACKER 0 10,197' OTIS CX UANDREL · 10,233' 10,510' - 10,540' 4 SPF 10, 5flF 4 ~F W~ Alaska 0il 4 Gas Cons, Commission Anchorage CUT PLUG F/ 10,707' - 10,800 CIdT PLUG F/ 11.540' - 11,800' (CALC) GRB 9/9/91 DATE MW ETD COMMENT~o . 08/15/91 .... BEGAN RIG MOVE AT 0600 HRS 8/15/91 08/16/91 FINISHED LEVELING LOCATION AND BERMED THE EAST EDGE. LAID OUT PIT LINER. SET RIG MATS AND FOLD UP BASE. TAPPED THE ABANDONMENT POST. RECOVERED OIL SAMPLES AND SENT TO THE OFFICE. SET RAMP AND CARRIER. BEGAN SETTING RIG OUT BUILDINGS. SET DEADMEN AND DERRICK GUIDES. SET MUD PUMPS, FUEL TANK, AND MUD TANK. INSTALLED ROTARY RIGHT ANGLE DRIVE. CONTINUED BUILDING BERMS AND RIGGING UP. 08/17/91 ALIGNED MUD PIT WITH PUMP SKIDS. SET #1 PUMP MOTOR SKIDS. SET CMOKE HOUSE SUPPORT BUILDINGS AND AND CAT WALK. PICKED UP THE SWIVEL AND KELLY. ACCEPTED RIG AT 1600 HRS. CHECKED THE ABANDONMENT POST FOR PRESSURE, NEG. FLUSHED CRUDE OIL OUT OF THE POST WITH WATER . ATTEMPTED TO PULL THE POST, NEG. CUT OFF THE POST 1.75' BELOW THE 13-3/8" CASING HEAD. 08/18/91 INSTALLED 13-5/8" 3M x 13-5/8" 5M DSA, THREE 13-5/8" 5000# SPACER SPOOLS, SINGLE GATE AND MUD CROSS. CHANGED THE ELEMENT IN THE NEW ANNULAR PREVENTOR. INSTALLED THE 13-5/8" SINGLE GATE AND ANNULAR. INSTALLED THE KILL AND CHOKE LINES. INSTALLED PITCHER NIPPLE. FUNCTION TESTED THE HOPE. 08/19/91 8O 29 79 30 PERFORMED ACCUMULATOR TEST. PRESSURE TESTED ALL HOPE TO 2250 PSI. TEST WITNESSED BY THE AOGCC. RIH WITH AN 8- I/2" SKIRTED~MILL. '-MILLED 4-1/2" ABANDONMENT POST AND 2-7/8" TUBING FROM 26.4' TO 28'. RIH WITH 4-3/4" OVERSHOT AND ATTEMPTED TO ENGAGE FISH, NEG. RIH WITH AN 8-1/2" SKIRTED MILL. MILLED TO 29' ~ 08/20/91 RIH WITH AN 8-1 MILL,, MILLED TO 3 ' MADE uP WAsH'PiPE~.AND'ATTEMPT TO RIH. THE uppER HYDRIL RAM WOULD ONLY OPEN ON ONE SIDE, FLEW IN A REPLACEMENT SCHAFFER SINGLE GATE. REMOVED BOPEo 08/21/91 ?8: 30 coNTINUED"CHANGING.OUT, SINGLE GATE RAMS.,.. ' ~??t?'Q';':' .i:'T~STED BOPE TO 250 PS! LOW AND 2200 PSI · - .... OK.' "~IO ON DAY RATE AT 0530 HRS. 'ill! UP 8~:1i'2'~.~OD X!!¥7~'"'~'ID WASH PIPE, WASHED FROM 30'* TO 71". RUNNING SMOOTH,.,. ~:~ "i';.??.NO:TORQUE'~POOH".~:* HECKED MILL. OK. -":~ ~?UNABLE"TO?~WORK;'O OF FI'SH AT'=~30' < ...... DRAINED B'OPE'STACK~ '"~'F'ISH LAYING AGAINST 9-5/8" CASING. .o .~ . ................................................ i~.._.L.ii~.!:t.': ........ ~ ..... ' ~ - ' DATE NIC I CREEK '~4 WELL HISTORY MW ~ 'D COMMEN 08121191 CONT'D RIH WITH A 7-3/4" IMPRESSION BLOCK SHOWED GOOD 2-7/8" TUBING PATTERN. RAN 2-7/8" O.S. AND ATTEMPTED TO CATCH FISH AT 30', NO GOOD. RIH WITH 4" MILL CONTROL AND 4" BASKET GRAPPLE. UNABLE TO WORK OVER FISH. RIH WITH 5-1/8" SAW TOOTH WASH SHOE. WASHED OVER FISH TO 40'. o8/22/91 78 68 WASHED OVER FISH WITH 5-1/2" x 4-7/8" I.D. WASH SHOE, WITH AN X BUSHING WITH A 4-1/2" I.D. WASHED OVER THE FISH TO THE X BUSHING AND WERE UNABLE TO WASH FURTHER. RIH WITH 5-3/4" x 4-7/8" ID O.S. WITH 3 TUNGSTON CARBIDE PADS FOR A REDUCED ID OF 4-1/2". MUD PUMP #1 DOWN. MUD PUMP #2 PLUGGED. RIG ON DOWNTIME FOR 1-1/2 HRS. BURNED OVER 4-1/2" OD MARKER POST AT 32.5'. RIH WITH 4-1/2" SPIRAL GRAPPLE. WORKED OVER FISH AT 31'. RECOVERED 5.3' OF 4-1/2" D.P. (MARKER POST). RIH ENGAGED 2-7/8" TUBING AT 32'. RECOVERED 5.35' OF TUBING. RIH AND ENGAGED 2-7/8" TUBING COLLAR AND RECOVERED SAME. RIH AND ENGAGED 2-7/8" TUBING WITH A BASKET GRAPPLE AND RECOVERED 1 JOINT OF TUBING (31.30') TOF AT 68'. MADE UP 12-1/4" WASH OVER PIPE AND WASHED OVER THE 9-. 5/8" CASING FROM 37' TO 48'. 08/23/91 80 68 CONTINUED TO WASH OVER THE 9-5/8" FROM 48'-84' RKB. RIGGED UP WIRELINE. RAN CCL TO 66'. 9-5/8" COLLAR AT 38' RRB, SOME SPLITTING ABOVE THAT. WASHED OVER 2-7/8" TUBING FROM 71' - 99'. 08124191 08/25/91 80 98 WASHED OVER 2-7/8" TBG FROM 99' - 100', TORQUING UP. SHOE SHOWED JUNK MARKS. RIH WITH ?-3/4" OVERSHOT BOWL, WITHOUT GRAPPLE, ENGAGED 2-7/8" TUBING AT 68' AND RIM WITH WIRELIN FILL AT ' '"~" 2:12' '2j~ ENGAGE'D:~' 8:'~:~ AND JT ' G~: :.U.P'- .:::RAN CCL ~?'?~:'~:'!:' 9 CAS lNG AT 47 ' . "?':'~"' ., .... O A 400 GRAM' STRING "SHOT AT SO'. 80 98 ~COVgRED 1-JT 07,~'9-5,!8.',.. CASIN6.[ ,, :,~?:,.~::~DE' UP' CROSSOVER.. AND SCREWED INTO . ..... ?j::~.:: NG, 9-5/8" 8.~RD CASING AT 80.73' ~':': ~'::':~:":~": .... 40K; CLOSED":.HyDR].L~?:'~'ND TESTED 9-.' x 13-.318" CASIN6 ANNULUS TO 1000 ..... FO~ I5 ~IN, P./'BOPE. : DATE NICE~i I CREEK ~4 WELL HISTORY MW 'O COMMENT~ 08/25/91 CONT'D 50K. MADE ROUGH CUT ON 9-5/8" CASING. REMOVED BOPE. MADE FINAL CUT ON CSG. BEGAN INSTALLING 10"-5M x 12"-3M CIW DCB SPOOL. 08/26/91 79 98 FINISHED INSTALLING CIW DCB SPOOL. TESTED DCB SPOOL TO 3000 PSI, OK. INSTALLED 13-5/8" BOPE. RAN 10" TEST PLUG. TESTED 3-1/2" PIPE RAMS, BLIND RAMS, CHOKE LINE, KILL LINE, CHOKE MANIFOLD AND ALL VALVES TO 250 PSI LOW 5000 PSI HIGH. TESTED THE HYDRIL TO 250 RSI LOW AND 3500 PSI HIGH. (9-1/2 HRS FOR THE TEST) WAZELL WITH AOGCC WAIVED WITNESSING THE BOPE TEST. 08/27/91 79 98 INSTALLED PITCHER NIPPLE AND FLOW LINE. LAYED DOWN WASH OVER PIPE. RIH AND ENGAGED 2-7/8" TUBING STUB AT 98'. RIGGED UP SLIM HOLE BOPE 3-7/8" X 5M BLIND RAMS, PIPE RAMS PUMP IN SUB, TIW SAFETY VALVE, PUMP IN SUB, D.P. STUB. TESTED TO 250 PSI LOW AND 5000 PSI HIGH, REPAIRED LEAKS. CHANGED BAD TIW SAFETY VALVE. RE-TESTED, REPAIRED MORE LEAKS, RE-TESTED O.K.. TESTED 1-1/4" PIPE iRAMS~2'50-LOW, 3500-HIGH. OK. MADE UP I'/4"'MILL, 1-3/4" SLIM HOLE MOTOR. RIH- AND STOPPED AT 41'. RIH WITH 2" MILL AND HUNG UP AT 41'. RELEASED THE OVER SHOT AND FOUND A XO WITH A 2" I.D.. CHANGED OUT THE XO. RIH AND ENGAGED 7/8" TBG AT 98'. RIGGED UP BOP AND TESTED, OK. 08/28/91 o8/29/9]. 79 98 79' . 98 :, RIGGED UP FLOOR. PICKED UP 2-1/4" MILL AND SLIM HOLE MOTOR AND TAGGED FILL AT ~].0', RIGGED UP POOR BOY SWIVEL AND DRILLED CEMENT FROM 210'-280'. TRIPPED FOR NEW MILL. RIH AND CLEANED OUT ../ CEMENT FROM 384'' 425'. :~? 1..25"~HYDRIL TUBING ..' ~ ~ 08/30/91 78 98 MADE' UP '2'25" MILL AND 1'~75" MUD MOTOR, TEST LINES, TUBING AND BOPE WITH 2.25" MILL ON' A 1...75" MUD 1-;::25'" COiLED/TUBING..'?!THE COILED TUBING,'UNIT' PUMP WENT DOWN. WORKED ON' ~.i.~ HRS. HfPP'TRIPPER DATE NIC~i MW 08/30/91 CONT'D 08/31/91 79 98 09/01/91 80 98 09/02/91 79 98 09/03/91 80 98 RECHiVED S EP 4 ]991 Alaska Oil & Gas Cons. Corr~mission Anchorage 09/04/91 80 98 CREEK #4 WELL HISTORY COMMENT~ TUBING UNIT PUMP DOWN FOR MAJOR REPAIRS. MOVED CEMENT PUMP UNIT TO LOCATION. NIH WITH 2.3" CHISEL BIT, HIPP-TRIPPER AND ACCELERATOR TO 346', HIPP-TRIPPER NOT WORKING. POOH. REPAIRED HIPP-TRIPPER AND NIH. REAMED FROM 342' - 366'. UNABLE TO GET DEEPER. CHISEL BIT SCARRED. NIH WITH 2.3" JUNK MILL AND 1-3/4" MUD MOTOR. MILLED FROM 366'-505'. CLEANED OUT CEMENT INSIDE 2-7/8" TUBING FROM 505' - 657'. POOH. NIH WITH A 2.3" CARBIDE CHISEL BIT AND HIPP- TRIPPER. TAGGED AT 657'. HIPP-TRIPPER WOULD NOT OPERATE. POOH AND CLEANED OUT THE INSIDE OF THE TOOL. NIH AND CLEANED OUT CEMENT FROM 657' -658'. SLOW PROGRESS. POOH. NIH WITH 2.3" MILL AND 1-3/4" MUD MOTOR. CLEANED OUT CEMENT INSIDE 2-7/8" TUBING FROM 658' -721'. CLEANED OUT CEMENT INSIDE 2-7/8" TUBING FROM 721' - 760'. POOH. NIH WITH A 2.25" MILL AND 1-3/4" MUD MOTOR. CLEANED OUT CEMENT FROM 760' -940'. CLENAED OUT CEMENT INSIDE 2-i/8" TUBING WITH 2.25" BIT AND MUD MOTOR ON 1-1/4" COILED TUBING FROM 940' - 1040', POOH. NIH WITH 2.25" PDC BIT AND 1-3/4" SLIMDRILL MUD MOTOR. CLEANED OUT CEMENT TO 1245'o FELL THROUGH CEMENT. NIH AND TAGGED CEMENT AT 7100'. CIRC AND CONDITIONED MUD. CIRC. AND CONDITIONED MUD. POOH WITH COILED TUBING. RIGGED UP WIRELINE AND TESTED LUBRICATOR TO 5000 PSI. NIH WITH CBL/CCL LOG. LOG FROM 7127' TO SURFACE. NIH WITH 1-11/16" TUBING PUNCH AND PERF'D 7084'-7087' WLM WITH 15 HOLES. POOH AMD MADE UP GUN f~2. NIH AND PERF'D FROM 6784'-6788' WLM. NIH WITH 2-1/8" RETAINER SETTING TOOL, UNABLE TO ENTER TUBING AT 98'. NIH WITH A 2.2 GAUGE RING ON 1-11/16" SINKER BARS. STOPPED AT 880'. ENCOUNTERED TIGHT SPOTS AT 868' 860' AND 825' . RIGGED DOWN £ , WIRE INE AND RIGGED UP COILED TUBING. NIH WITH 2,3" MILL AND 1-3/4" MUD MOTOR ON 1-1/4" COILED TUBING. TAGGED AT 790'. REAMED CEMENT INSIDE THE TUBING FROM 2.25" TO 2.3" FROM 790'-943'. REAMED CEMENT FROM 943' TO 1245'. CONTINUED IN THE HOLE TO 7100' WITH THE 2.3" MILL, 1-3/4" MUD MOTOR ON 1-1/4" COILED TUBING. CIRCULATED OUT PRODUCED WATER FROM THE 2-7/8" x 9-5/8" ANNULUS DATE .NIC CREEK #4 WELL HISTORY MW COMMEN~ 09/04/91 CONT'D (325 BBLS OF 8.6PPG BRINE) CIRCULATION PATH WAS MOST LIKELY THROUGH THE PERFS AT 708'4' @ 6784' TAKING RETURNS THROUGH THE SIDE POCKET MANDREL AT 2054'. POOH 09/05/91 79 98 RIGGED UP WIRELINE AND TESTED THE LUBRICATOR TO 5000 PSI. RAN 2.2" GAUGE RING ON 12' OF 1-11/16" SINKER BARS TO 7100'. OK. RAN 2.2" OD SLEEVE AND 2.125" O.D. X 53" bONG MERLA MANDREL "A" SETTING TOOL, SET DOWN AT 100' WLM (98' DPM). RAN MODEL "A" RETAINER WITH AN OD OF 2.185". SET DOWN AT THE SAME PLACE, APPEARED TO BE SETTING DOWN ON THE LOWER SLIP COLET. PULLED 60,000 LBS ON THE TUBING AND RIH WITH A 2.125" O.D. SETTING TOOL WITHOUT THE SLEEVE, HUNG UP AT 98'. RIGGED UP COILED TUBING AND RIH WITH A 1-1/2" X 2.3125" TAPERED MILL ON A 2-1/16" HORIZON MUD MOTOR. DRESSED THE TOP OF THE TUBING AT 98' AND CONTINUED IN THE HOLE TO 1350'. ENCOUNTERED TIGHT SPOTS'AT 866' 868' AND 890'. CIRCULATED. POOH AND RIGGED DOWN COILED TUBING. RIH WITH 2.125" OD x 53" MERLA SETTING TOOL TO 7050'. RIH WITH A 2.185" TELEDYNE-MERLA MODEL "A" CEMENT RETAINER ON HLS 1-11/16" SETTING TOOL. HAD TO WORK PAST A TIGHT SPOT AT 900'. SET THE CEMENT RETAINER AT 7009'. POOH WITH WIRELINE. RIGGED UP WIRELINE AND STABBED INTO THE RETAINER AT 6900' CTM. REPAIRED A BAD OIL SEAL ON THE COILED TUBING REEL MOTOR. 09/06/91 80 98 FINISHED REPAIRING THE COILED TUBING UNIT. ESTABLISHED CIRCULATION AT 3300 PSI AND 1/2~ BBL/MIN. PUMPED 27 BBLS AT 3900 PSI 3/4 BBL/MIN. PUMPED 5 BBLS WATER, 124 CUFT OF CLASS G CEMENT AT 15.8 PPG WI.TH 0.2% CD-31, 0.4% R-5, 1- GPHS FP6L AND 0.5 BBLS OF WATER. DISPLACED WITH 12.3 BBLS OF 80 PCF MUD CIP AT 0255 HRS. UNSTABBED FROM THE RETAINER AND BALANCED 11CUFT ON TOP OF THE RETAINER. MAXIMUM PRESSURE DURING THE JOB WAS 3/4 BPM AT 3900 PSI. PULLED UP TO 4500'° CIRC. POOH. RIGGED DOWN COILED TUBING. RIGGED UP WIRELINE. RIH AND PUNCHED 16 -I/4,~HOLES FROH 4294'- 4298' AND~3992' -_3996' RAN 2-7/8" TELEDyNE-MERLA TYPE "A" CEMENT RETAINER.'..: AND SET ATi'4240'. RIH WITH COILED TUBING AND.CIRCULATED 10 BBLS OF MUD. STABBED INTO THE RETAINER AT 4220' CIRCULATED"'~20--BBLS OF':MUD. MIXED ~ND PUMPED'5"BBL$ OF?'WATER, 124' CUFT OF 15 PPG CEMENT WITH 0','2%' CD-31, 0.31 R-5, I DATE MICROpro' CREEK #4 WELL HISTORY MW COMMENT 9/06/91CONT'D 09/07/91 80 98 GPHS FP-6L, CIP 1600 HRS, BALANCED 11 CU FT OF CEMENT ON THE RETAINER. PULLED UP TO 1500' CIRC. WAITED ON CEMENT. RELEASED FROM THE OVERSHOT AT 98' REDRESSED THE PACKOFF AND ENGAGED THE TUBING AT 98'. TESTED TO 800 PSI, OK. WAITED ON CEMENT. MIKE HINDER WITH THE AOGCC ON LOCATION TO WITNESS PLUG SETTING AND PRESSURE TESTING. PRESSURE TESTED CEMENT PLUG #2 4294'-3990' AND THE ORIGINAL TEXACO PLUG FROM 100' - 1000'. TO 200 PSI. OVERSHOT PACKOFF FAILED, RELEASED FROM THE TUBING AT 98', CHANGED PACKOFF. ENGAGED THE TUBING AT 98'. PRESSURE TESTED THE PLUGS TO 2000 PSI, BLED TO 1600 PSI IN 10-MINS, SLIGHT OIL AND GAS AT THE PITCHER NIPPLE. PRESSURE TESTED TO 2000 PSI BLED OFF TO 1600 PSI IN 27 MINS. CLOSED IN AND PRESSURE TESTED THE CEMENT UNIT TO 2050 PSI, OK. CLOSED THE HYDRIL AND PRESSURE TESTED TO 2000 PSI, BLED TO 1900 PSI IN 40 MINS. ZERO PRESSURE UNDER THE HYDRIL. OPENED THE CHOKE AND KILL LINES, TUBING PRESSURE BLED FROM 1900 TO I650 PSI IN 25 HIMS. PRESSURE TESTED PLUG TO 2000 PSI, BLED TO 1850 PSI IN 30-MIN, MONITORED WELL FOR 30 MIN SLIGHT OIL AND GAS BREAKING OUT OF THE PITCHER NIPPLE. RIH WITH WIRELINE AND PUNCHED 15-1/4" HOLES FROM 996'-1000'. WELL STATIC. RIH WITH COILED TUBING. WORKED COILED TUBING FROM 2050' - 2070'. CIRC THROUGH THE GLM AT 2054' WITH 80 PCF MUD. RECOVERED 1BBL OF OIL, 93 BBLS WATER. 09/08/91 80 15 PULLED COILED TUBING TO 1100'. PUMPED 1 BBL WATER, 2,7 SXS "G" NEAT CEMENT AT 15..8 PPG, WITH 0.2% CD-31, 0.3% R-5, 0.5 GPHS FP-6L, 0.5 BBL WATER. POOH WITH COILED TUBING AT~.801..:FpN., .... DISP CEMENT AT LAYING CEMENT.PLUG FROM 1100' .... CEMENT INPLACE AT 0130 HRS. WAITED ON 12 HRS, TAGGED SOFT CEMENT 211 2'55t'''~ 'PULL UP TO-' 200*, CIRC. WAITED ON CEMENT 4 HRS'. RIH AND TAGGED HARD CEMENT AT 357* WITH I000# COILED TUBING WEIGHT PULLED UP TO 120' CIRC POOH' RELEASED FROM THE TUBING AT 98'. RIM WI.TH DRILL PIPE TO 94'. ~PUMPED 2 BBLS WATER, 26':SXS "O!' NEAT WITH 2% CALCIUM AT .15.8 PPG. ' DRAINED AND WASHED THE ' BOPE-STACK. REMOVING THE:BOPE AT 2400 ii~:i!~HRS~ '~MIKE MI'NDER; 'AOGCC'APPROVED ALL P~UG SETTINGS AND I'NTEGRIT¥ TESTING 9t8/9~. DATE 9/09/91 NIC i CREEK #4 WELL HISTORY f . MW ET'D COMMENTS REMOVED THE BOPE, PITCHER NIPPLE, TRIP TANK, AND SPACER SPOOLS. INSTALLED 10" 5000 PSI BLIND FLANGE ON THE 10" 5M X 12" 5M CIW SPACER SPOOL. LOADED OUT CEMENT UNIT, WIRELINE UNIT, AND COILED TUBING UNIT. VAC TRUCK SUCKING HEAVY RAIN OFF OF LOCATION. CLEARED RIG FLOOR OF RENTAL AND HANDLING TOOLS. SPOTTED RESERVE TANK ON THE #2 LOCATION AND BEGAN TRANSPORTING MUD. LAID OVER DRILL FLOOR AND SUB BASE. LOWERED THE DERRICK. LAID PIT LINER ON THE #2 LOCATION. SET RIG MATS, TRANSPORTED AND SPOTTED DRILL FLOOR OVER #2 WELL. THE ROAD 1/2 MILE ABOVE THE GRANITE POINT TANK FARM WASHED OUT. INSTALLED A SECOND 14" CULVERT. RELEASED GRACE RIG # 211 AT 2400 HRS. AOGCC GEOLOGICAL MATERIALS INVENTORY LIST PERMIT # ct ~ - ~ L~ O WELL NAME 1~ t CC~L~ COMPLETION DATE o! 1_2-O te/I CO, CONTACT check off or list data as it is received.*list received date for 407. if not required list as NR 407 l* 9 J'Z.LI JOlI drilling history. V", (~u,rvevlf~ welltests ~ l core descriptiorJj~_~', cored in{c~va,,!,~ core analysis 10(2. dry ditch intervals digi,tal data ! -- i i LOG TYPE RUN INTERVALS SCALE , NO. [to thc nearest foot! [inchl100'~_ 1! i i i ii i ii i iii i ii i i i 11I 131 , , , .. 17) ~) ........ Iq Unocal North America-~i'n~ Oil & Gas Division / Unocal Corporation %: P.O. Box 190247 Anchorage, Alaska 99519-0247 Telephone (907) 276-7600 UNOCAL Alaska Region September 3, 1991 Mr. Lonnie Smith AOGCC 3001 Porcupine Drive Anchorage, AK 99504 Dear Lonnie: As we discussed a more efficient way of abandoning the Nicolai Creek #4 well would be with coiled tubing. Attached is a procedure to reabandon the well. We have completed steps 1-11 at this time and request permission to continue with the procedure. Sincerely, George R. Buck Drilling Engineer GRB/lew SEP o 1991 Alaska 0ii & Gas (Sons, ~ ~,~:~ch0rage t STATE OF ALASKA AL~, OILAND GAS CONSERVATION COMMI~''~ .,,! APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~__ Suspend __ Operation shutdown __ Re-enter suspended well __ Alter casing ~ Rep~r ~gell __ Plugging x' Time extension __ Stimulate __ Change approved program,~ Pull tubing __ Variance __ Pedorate __ Other 2. Name of Operator_ ( U~OC..Z--,~L, ) , 5. Type of Well: 6. Datum elevatio~ ~DF or KB) Union Oil uompany of California Development__ 3~Address_ t~.O. t~ox 190247, Anch., AK, 99519 4. Location of well at surface 2206' N, 297' W from S.E. Corn. SEc. 29, Attopdproductiveinte~al (10,500') 364' S 2323'W of N.E. Cor. Sec 29, TllN, ~effectivedepth (98') Exploratory Stratigraphic Service TllN, R12W R12W SM 2206' N, 297'W from S.E. Cor Sec. 29, TllN, R12W, At total depth ( 12,7 4 4 ' ) 947' S, 2988' W. of S.E. Corn. SEc. 32, TllW, 12. Present well condition summary Total depth: measured true vertical 12,744 11,957 feet 7. Unit or ~i~;~.~N_ra~ine Creek 8. Well number SM Nicolai Creek #4 9. Permit number 91-100 10. APl number 50-- 283-20033 11. Field/Pool Ri2W, ;M Nicolai Creek feet Plugs (measured) feet Effective depth: measured feet Junk (measured) true vertical 98 feet 98 Casing Length Size Cemented Structural 7,800-9,409 (calc) 98'-1000' (calc) Measured depth True vertical depth Conductor 40 ' 30" Driven 52 · Sudace Intermediate 298' 20" 750 SXS 308' Production 2126' 13-3/8" 30'0 SXS 2134' 9012' 9-5/8" 1700 sxs 9018' Liner 1999' 7" 240 SXS 8701'-10,700' Perforation depth: measured 52' 308' 2086' 8535' 8249'-10,080' true vertical 10,500', 10,510'-10,540', 10,588' 9896' 9905'-9933' 9977' RECEIVi D Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) 2-7/8", EUE, 10,270' Brown SP Packer at 10,197' 5£P 0 1991 Alaska Oi~ & Gas Cons. Coma_ Anchorage 13. Attachments Description summary of proposal ..K. Detailed operations program ~ BOP sketch ._~ 14. Estimated date for commencing operation / 15. Status of well classification as: September 3, 1991 16. If proposal was verbally approved Oil x' Gas_ Suspended __ Name of approver Date approved Service 17. I hereby cert,~ that the foregoing is true and correct to the best of my knowledge. ,9. ~, GA~ S . B~ ~ REGIONAL DRILLING MANAGER Signed --F~~ ~,~-~ ~=.~__ ~.,,~ Title Date ~ ~ FOR COMMISSION USE ONLY Conditions of ap~)r(~val: I~i~y Commission so representative may witness Plug h3t/egrity _.~ BOP Test __ Location clearance .... Mechanical Int6rgrity Test ~ Subsequent form required 10- Approved by order of the Commissioner ORIGINAL SIGNED BY LONNIE C. SNI'!T~I JApproval ~ proved C°P~/ P p, etufn_ed/;,/ Commissioner Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE KB -'- 15' NICOLAI CREEK CURRENT #4 SPUD 12-02-69 ABDN 11-27-71 17 1/2" HOLE 13 3/8" 5,1..5~1 · 2134' 2 7/9, 6.5~11, N--SO, EUE, TO 10,270' eJ.. I,f,,en~ua. · 2.034 (NO V4.W') 12 1/4"HOLE ?' 26-2B~ Fl 8701' - 10,700' oe-o w/2~o sx 10 -- 12.744' 4,376' GJ.. MANDREL · 6,475' 2 1/4' HOLES · g4og' TYPE G 'I~G PLUG ~ 9410' TYPE F 'fBG StOP · g,1.12' Ftm~ (OhS XX PLUG) · ~1~' GL. ~ · lo,158 BROWN H-1-SP PA(~ · 10,197' CMT Pt. UG F/ 10,707' -- lO, BO0 CMT PLUG F/ 11.640' -- 11,800' GRB ~/16/91 KB = 15' NICOLA! CREEK PROPOSB #4 SPUD 12-02-69 ABDN 11-27-71 CMl'I) 1~ 750 ~( 17 1/2' HOLE 13 3/8" 5,,1..5~1 I 2134' CW'D W/3oo sx 12 1/4' HOLE c~ iN ~iN FI Teo~ - e4of CMT IN ~ Fl 71~ -- ~ 2 7/8", 6.5~, N-80, E]JF.,, TO 10,271)' TYPE G mO PLUG e ~10' 'IYPE F l~O ~ · rm,J (ohs xx PLu~) · ~.1~' OJ.. IA~ · lo,158 011~ CX I,~ · lo,1~2' BR(~/N H-I-~P PA(~ · lo,lg7' OTIS CX kINdORB,, · 102.33' 7" 26--29~ F'/8701' - lo,70o' (:l~'m w/24o sx 10 -- 12.744' 10500' 4 SPF WSO 10,510' - lo,540' 4 5PIr lo, 588' 4 ~PF W30 PLUG Ir/ 10.707' - 10.800 1.640' -- 11.80(0 (CAI.C) GRB 5/16/9 1 1. Install a 13-3/8" starting head on the existing casing stub. 2. Move in and rig Up. 3. Install and test BOPE to 2250 psi. 4. Wash over and recover 2-7/8" tubing to 98'. 5. Wash over and recover 9-5/8" casing to 80'. 6~ Tie back into the 9-5/8- casing and land the casing in the 13- 3/8'" starting head. 7. Remove BOPE. 8~ Install 9-5/8" DCB spool. Install and test BOPE to 50-00 psi. 10. RIH with coiled tubing and clean out inside the 2-7/8" tubing to 7100'. 12. Run a CBL inside the 2-7/8" tubing from 7100' to surface. Punch the tubing from 6950'-6954' and 6650'-6654'. 13. Set a cement retainer inside the 2-7/8" tubing at 6900'. 14. Circulate a 300, cement plug from 6950'-6650'in the 2-7/8" x 9-5/8" annulus. 15. Lay a 400' cement plug inside the 2-7/8" tubing from 6900'- 6500'. NI~LAI ~ #4 PROCEDURE PAGE 2 16. Punch the tubing from 4300'-4304' and 4000'-4005'. 17. Set a cement retainer inside the 2-7/8" tubing at 4250'. 18. CirCulate a 300' cement plug from 4300'-4000' in the 2-7/8" x 9-5/8" annulus. 19. Lay a 400' cement plug from 4250' to 3850' inside the 2-7/8" tubing. 20. Lay a balanced cement plug from 1000' to 150' inside the 2- 7/8" tubing. 21. Release from the 2-7/8" tubing. 22. Lay a balanced cement plug from 98' to surface. 23. Install a 9-5/8" blind flange on the DCB spool. 24, Weld on an annotated abandonment marker. 25. Rig down and move out. 26. Clean and level the location. BELL NIPPLE I FLOWLINE MINIMUM 2" KILL LINE WITH (2) 2- ~u VALVES KILL LINE FROM MUD PMP & CEMENT UNIT CONTRACTOR PROVIDE OPERATOR PROVIDE 13 5/8 3000 PSi ANNULAR BLIND RAMS I I PIPE RAMS I SPACER SPOOL I SINGLE GATE 3M I 13 5/8 3M FLANGE 3" CHOKE LINE WITH ONE REMOTE &: 1 MANUAL 3" 3M VALVE fl) r,I;) I CONNECTED TO CHOKE MANIFOLD (SEE MANIFOLD DRAWING) SINGLE GATE 3M 13 5/8 3M FLANGE ADAPTER FROM 13 5/8 3000¢ FLANGE I' I 13 5/8" 3M DOPE STACK NICOLA! CREEK #l-A, 2, 3, UNION OIL COMPANY OF CALIFORNIA (dba UNOCAL) DRAWN: GRB SCALE: NONE DATE: 6/7/91 TO RESERVE PITS TO WORKING PITS tlYDRAULIC ACTUAl'ED CHOKE PRESSURE GAUGE TO BOPE MANUAL CHOKE CHDKE MANIFI]L]D UNOCAL RE(~UIREI) 3"-3000 PSI MIN EXIBIT "~" ~ I~N TNiI~R ~ UNIT 1058 ],.O0'Serles DS322 ~,.25"~erles D5323 TOOLS OCT. 14 P.O. Box 19727 Houston, Texas 7 - ~~ Telex: 790905 TX TOOLS HOU phone: (713} 6206 MEMORANDUM TO: Lonnie C sm~h~/ commissioner FM: Louis R Grimaldi~f~ Petr Inspector TATE OF AI,ASKA Alaska Oil and Gas Conservation Commission DATE: August 19, 1991 FILE: LG819 SUBJECT: BOP Test Unocal Nicolai Cr #4 Permit # 91-100 Sec 29 TllN R12W SM 1. Workover I traveled to the west side of Cook Inlet to witness a BOP test on Grace Rig #211 which was preparing to drill out a surface plug on Unocal's well Nicolai Creek #4. When I arrived, the crew was just finishing rigging up. Once the test was under way, things went fairly smooth with no failures noted. There were no provisions made for reserve pit tankage, and the blooey line was in the general direction of the inlet. At my request, Mike McCall had the line changed, and it now points down the location which is partially bermed. I was assured that by the time the rig was ready to test again, there would be tankage of some sort. The location was quite clean and orderly, considering ..t~ e amount of activity; and it appeared that the tool pusher, Mike Murray, was attempting to anticpate all possible problems. In summary: The BOP test Went well on Grace Rig #211 with no observed failures. Attachment OPERATION: Drlg , Wkvr Opera. tot (J JL) ~) C I~._ STATE OF ALASKA ALASKA 01L AND GAS CONSERVAT I ON COMM I SS I ON BOP Test Report con .ct. E&cF Location (general) ~ Well sign Housekeeping (general) ~ Rig Reserve pit ~~ MUD SYSTEMS= Visual Audio Trip tank :~C ~ I ~: ~ Pit gauge ~ ! ~ Flow monitor /~ ! ~'/ Gas detectors I TEST: Initial Representative, Permit # ~ ~/ Week 1 y.__ Other ~ ¢~L Casing set @ Rig# o~ / / Rep ~' ACCUMULATOR SYSTEM: Full charge pressure Press after closure ,/~',g~ Pump incr clos press 200 psig Full charge press attained Control s: Master ft psig psig min~t~ sec min ~sec psig. ~,~;~ Remote /-'~/' B1 ind switch cover KELLY AND FLOOR SAFETY VALVES: Upper Kelly Test pressure ,~ ~i~) BOPE STACK: Test Pressure Lower Kelly '~ Test pressure~'-iDlE:) Annular preventer ..... ~~ Ball type ~ Test pressure Pipe rams ~~ Inside BOP ~ Test pressure Blind rams ~~ Choke ma n~fold ~Test pressure _ . _ ~~D Number valves Choke line valves ~~ HCR valve /~/~E ~~ Number flanges ...... Ki11 line valves ~~0 / ~~0 AdjustabJechokes Check valve ~/~ Hydraulically operated choke ,/ TEST RESULTS: Failures ~ Test time g~ hrs Repair or replacement of failed equipment to be made within days. Notify the Inspector, and follow with written/FAXed verification to Commission office. Remarks: Distribution: orig - AOGCC c - Operator c - Supervisor C.004 (rev 07/08/91) WITNESS ALASKA OIL AND GAS CONSERVATION COMMISSION July 19, 1991 WALTER J. HIGKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 Gary S. Bush Regional Drilling Manager UNOCAL Corp. P. O. Box 190247 Anchorage, AK 99519-0247 re: Nicolai Creek Unit - Nicolai Creek #4 re-entry ' UNOCAL Corp. Permit No. 91-100 Sur. Loc 2206'~ 297'W FSE cor. Sec. 29, TllN, R12W, SM Btmhole Loc 947'S, 2988'W of SE cor. Sec. 32, TI~ ~ R12W, SM Dear Bush: Enclosed is the apProved application for permit to drill authorizing re-entry of the above referenced abandoned well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The Commission will advise you .of those BOPE tests and abandonment cement plugs that it wishes to witness. au'anglo, co s ,on BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental-Conservation w/o encl. 'JL STATE OF ALASKA O% ALASKA AND GAS CONSERVATION C '~'~MISSlON PERMIT TO DRILL 2O AAC 25.005 la. Type of work Drill ~ Redriil ~1 lb. Type of well. Exploratory ~ Stratigraphic 'lest ~ Development Oil ~ Re-Entry ~ Deepen~1 Service - Developement Gas -- Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool (UNOCAL) Onion Oil Company of California 45' feet NICOI~I 3. Address 6. Property Designat_ion ~,:~.~c~,~{'io-~-~f'~e-I~-~ ~u-r~tace- - 7. Unit or property Name 11. Type Bond(see2O~,Ac25.o25) 2206' 1{, 297' g gROg $.g. COt. Sec 29 ~ZL-q, ]L1.2N~ S.1{. 1{icolai C::eek 0nit ~nited Pac. Ins. ¢o. At top of productive interval 8. Well nu .tuber Number (10~500') 364'5 2323' ii O~ 1{.g. COt. Sec. 29~ ~111{, ~12ii, SM 1{icolai C:eek ~4 062-9269 At total depth 9. Approximate spud date Amount (12,744') 947'S, 2988' ii o~ S.R. COt. SeC 32, ~11ii, R12ii SI{ 7-25-9]. $200~000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in prOperty 15. Proposed depth{MDa~u'rvD) property line Greater t, ban 500 feet greater ~a~ 500 feet 2982' Same feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 {e)(2)) Kickoff depth 700 feet Maximum hole angle 25 o Maximum surface 2690 ~s~ At total del)th ('rVD) 5380 Dsig 18. Casing program Settin,c Depth size Specifications Top Bottom Quantity of cement Ho,~ ! Casing WeightlGradelOoup,inglLength M'D I TVD I MD j TVD (include stage data) .... --- 30" 40' 12~ 12' 52' 52' ~iven 26" ' 20". '85i¢ J-55 S/ii 298' .... 10~ 10' 308' 308' 250 Sacks ].?-1/2" ].3-3/8" 54.5 ,]-55 Butt 2126' 8' 8' 2].34' 2.086' 300 Sacks 12-1/4" 9-5/8" 47¢ '1{-80 Butt 9012 6' 6' 9018' 8535' 1700 Sacks ?" 19~ N-80 Butt . i999', 8701'. 10700' 8248' 10080' 240 Sacks 19. To be ;;ompleted 'for Redriil, Re-entry, and Deepen Operations. Present well condition summary Tota{ depth: measured feet Plugs (measured) true vertical 12744' feet 7800'-9409~ (Calc) 11957' 28'-1000' (Calc) Effective depth: measured 28' feet Junk (measured) true vertical 28' feet 28' Tubing cemented in place Casing Length Size Cemented Measured depth True Vertical depth Surface Intermediate dUL ~ ~ Production ,4/aska Oil & P~aS Corl$. Co~JSSJ0[} Liner 10~500', 10,510'-10,540', 10,588' Anchorage Perforation depth: measured 9~896'/ 9~905/-9~933'~ 9~977' true vertical ,, , 20. Attachments Filing fee ~ Property plat ~ BOP Sketch ~ Diverter Sketch ~ Drilling program ~ Drilling fluid program [] Time vs depth plot ?3 Refraction analysis [] Seabed report .' 20 AAC 25.050 requirements 21. ! hereby certify thi~t~he foregoing is.J.r, pe and correct to the best of my knowledge "~'Signed .~({~~~~SH'~ ,.,.~¢~. Title ]),]~,6101{.~ DRIU.,I1{6 M.LNA6. Date Commission Use Only ,, Permit Number t APl number I A~)~v~ date I S.e oov~r ,~tt~, ¢/-/mO '50-- Z ~ -- ~. o~ ~.~ / ?.... ~2/ for other requirements Conditions of approval Samples requir_ed ~ Yes ~ No Mud log,required .~...Yes ~ No Hydrogen sulfide measures [] Yes ~ No Directional survey required ~ Yes~'. No Required working pressure for BOPE ?,2M; ~ 3M; ~ 5M; Fi 10E4; :-; 15M Ct her: (,~--""~.~.~ ~._~ ~ · . .~-- by order of Approve~O~~;~ Commissioner the commission Date ~/,/t, Form 10-401 Rev. 12-1-85 Subm {licate NICOLAI CREEK #4 1. INSTALLED WELLHEAD. 2. MOVE IN AND RIG UP. 3. INSTALL AND TEST BOPE TO 3000 PSI. 4. RIH WITH A METAL MUNCHING ASSEMBLY AND CLEAN OUT TO 2054'. 5. RIH WITH AN OVERSHOT AND ENGAGE THE TUBING. · · RIH WITH WIRELINE AND CUT THE TUBING AT +/- 7500'. PULL OUT OF THE HOLE WITH THE TUBING. 8. LAY AN ABANBONMENT PLUG FROM 7500' TO 7100'. 9. CIRCULATE WITH 80 PCF DRILLING MUD. 10. LAY AN ABANDONMENT PLUG FROM 600' TO 300'. 11. LAY AN ABANDONMENT PLUG FROM 300' TO SURFACE. 12. CUT OFF THE WELLHEAD. 13. WELD A METAL PLATE ACROSS THE CASING. 14. INSTALL AN ABANDONMENT POST. 15. RDMO. KB = 15' ~y' CIO e 4II 21' HOLE CUrD W~ ?M) SX 17 1/2" 12 W~ ~~ ~ DEO 7' 28-2I~ F/B701' - 10,70~ 10 -, 12,744' NICOLAI CREEK CURRENT SPUD 12-02-69 ABDN 11-27-71 2 7/~'. Li~ N-M). EU~ TO lo,27o' ~ kwimm. · ~ (NO V)LW) !0~ 4 Si~ WSO 10~1~- 1~4~ I0, I(~G NICOLAI CREEK #4 KB -,,' 15' PEOPOSED 17 1/~ ~ ~3 3/I' ~ · 21~F 12 1/4~ Hr~ ."1 · : : ixx xxx',q. TD - I~74~ .'-. ................... SPUD 12-02-69 ABDN 11-27-71 I~ Iq. uo ~ Flit TO WA(I IO, M)O' 4 Iqr IOJ10' - 10~41~ 4, ~1r 10, I 4 ~FT I ~ ~UO F/ 10,~? - lOJ~ CUT Pi.uG ir/ 11.64o' - I1,M)O* (Mc) GRB 5/16/g 1 BELL NIPPLE ~ FLOWLINE MINIMUM 2" KILL LINE WiTH (2) 2" 5M VALVES KILL LINE FROM MUD PMP &: CEMENT UNIT 13 5/8" 5000 PSI ANNULAR BLIND RAMS I I ' i ,I SINGLE GATE 5M 13 5/8" 5M FLANGE 3" CHOKE LINE WITH ONE REMOTE &: 1 MANUAL 3" 5M VALVE · I~-~ · f-% .......... ~ CONNECTED TO CHOKE MANIFOLD (SEE MANIFOLD DRAWING) IPIPE RAMS ! I i 13 5/8" 5M FLANGE SINGLE GATE 5M 13 5/8" 5M FLANGE ADAPTER I ,I 9 5/8" 5M SOW HEAD gECEIVEDi JUL 11 1991 ~laska 0il & Gas Cons. ¢'ornrnis~ Anchorage 13 5/8" 5M BOPE STACK NICOLA! CREEK #4 UNION OIL COMPANY OF CALIFORNIA (dba UNOCAL) DRAWN: GAB SCALE: NONE DATE: 06/,30/9 1 TO RESERVE PITS TO WORKING PITS HYDRAULIC ACTUATED CttOKE PRESSURE GAUGE TO BOPE MANUAL CHOKE i Unoed N~ ~m~# ~ ,Ir 0~ Plv~km CHI]KE MANIFDLD UN[]CAL REQUIRED 3~-3000 PSI HIM E>(IBIT CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE ~ [2 thru 8] le 1 3. 4. 5. 6. 7. 8. C3) Admi n . [~>~ ~ 9. [9 thru 13] 10. [10 & 13] 12. [14 thru 22] 15. [23 thru 28] 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. (6) Other X//~. 7//~,~? 29. [29 thru 3'1]' 30. 31. (6) Addl ~~. 7-1,~q/ 32. g eo 1 og~. DWd_p~ RPC~.fl__(.~__ eng i neer i ng~e~ MTM .~--~,- LCS.~ BEW~j~t'- RAD]~ Company Is permit fee attached ............................................... Is well to be located in a defined pool ................. -.. ............ Is'well located proper distance from property line ................... ~_ is'well located proper distance from other wells ..................... Is sufficient undedicated acreage available in this pool ............. ~ Is well to be deviated & is wellbore plat included ................... Is operator the only affected party .................................. ~ Can permit be approved before 15-day wait ............................ ~ Does operator have a bond in force ................................... g Is a conservation order needed ....................................... Is administrative approval needed .................................... Is lease ncrnber appropriate .......................................... ~_ Does well have a unique name & ncrnber ................................ Is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. .. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface & intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... . . Is old wellbore abandonment procedure included, on 10-403 ............. Is adequate wellbore separation proposed ............................. Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... ~_ Are necessary diagrams & descriptions of diverter & BOPE attached .... /~. Does BOPE have sufficient pressure rating -- test to~psig ..... ~ Does choke manifold comPly w/APl RP-53 (May 84) ...................... ~ Is presence of H2S gas probable ...................................... FOR EXPLORATORY & STRATIGRAPHIC WELLS' Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Additional requirements ............................................. INITIAL GEO1 UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE , , ,, YES NO REMARKS /7 Additional remarks · rev 03/29/91 jo/6.011 -4 SKZ