Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout2023 Northstar Oil Pool
Hilcorp Alaska, LLC
Post Office Box 244027
Anchorage, AK 99524-4027
3800 Centerpoint Drive
Suite 1400
Anchorage, AK 99503
Phone: 907/777-8486
Joleen.oshiro@hilcorp.com
April 1st, 2024
Brett Huber Sr, Chair
Alaska Oil & Gas Conservation Commission
333 W. 7th Avenue, Suite 100
Anchorage, Alaska 99501-3539
RE: NORTHSTAR UNIT, NORTHSTAR FIELD, NORTHSTAR OIL POOL, STATE OF ALASKA,
2023 ANNUAL RESERVOIR REVIEW
Dear Commissioner Huber:
In accordance with Conservation Order No. 458A, Hilcorp Alaska, LLC (“Hilcorp”), as Operator, hereby submits for
your review the following Annual Reservoir Review for the Northstar Field.
This is the Annual Reservoir Review and corresponds to events during the 2023 calendar year. Note that the
Northstar Field has been on production since November 2001.
A. Progress of Enhanced Recovery Project and Reservoir Management Summary
During 2023, no new wells were drilled or sidetracked in the Northstar Unit. Therefore the locations of all the wells
in the Northstar Unit have remained unchanged.
Production and injection statistics are summarized in Table 1. Average daily oil production from the Northstar Oil
Pool was 4232 bopd and average daily gas injection was 395 mmscfpd. The reservoir voidage balance values
reported do not include oil production or gas injection from outside the Northstar Oil Pool. The outside pool
production includes satellite well NS-34A and Kuparuk zone production. Kuparuk gas injection is also excluded.
During 2023, gas injection was calculated to be 7554 thousand-reservoir barrels (MRB) less than reservoir voidage.
At year end, the reservoir overall cumulative voidage replacement ratio was 0.93. The average reservoir pressure
from surveys obtained in 2023 was 5124 psia.
Hilcorp became the official Operator of the Northstar Field effective November 18, 2014.
Page 2
As of 12/31/2023 Full year (1) As of Dec-23 (2)
Producers 15 11
Injectors 5 4
2023
Cumulative Start-
Up through
12/31/23
1,544,718 181,813,374
152,312,157 3,200,765,710
3,780,989 92,646,977
5,449,787 105,042,036
144,275,917 3,549,617,883
105,662 2,414,515
98,108 2,412,852
-7,554 -1,663
4,232
417,294
10,359
14,931
395,276
5,124 psiaAverage of surveys obtained in 2023
Water, BWPD
Injection
Water, BWPD
Gas, MCFPD
AVERAGE RESERVOIR PRESSURE
DAILY AVERAGE RATE DATA 2023
Production
Oil, BOPD
Gas, MCF/D
Gas (MCF)
Balance (excludes satellite well NS-34A and Kup Production/Injection )
Cum Production (MRB)
Cum Injection (MRB)
Over/Under (MRB)
Oil (BBL)
Gas (MCF)
Water (BBL)
Injection
Water (BBL) into NS10 & NS32 Disposal Well
(1) Well count data reflects ONLY those wells which contributed to production/injection during the respective year
(2) Active wells as of December 2023
PRODUCTION/INJECTION STATISTICS
Production
Table 1: NORTHSTAR FIELD 2023 OVERVIEW STATISTICAL SUMMARY
WELL STATISTICS
NOTES:
Page 3
B. Voidage Balance by Month of Produced Fluid and Injected Fluids – 2023
C. Summary and Analysis of reservoir pressure surveys within the pool
Static bottom hole pressures collected in 2023 are summarized below.
D. Results and Analysis of Production and Injection log surveys, tracer surveys, observation well
surveys and any other special monitoring
No new Ivishak production profiles were obtained in 2023.
E. Review of pool production allocation factors and issues over the prior year
Month
Oil,
MRB
Free Gas,
MRB
Water,
MRB
Total
Voidage,
MRB
Year
Cum, MRB
Cum since
start-up, MRB
Total
Injection,
MRB
Year
Cum,
MRB
Cum since
start-up,
MRB
Net
Injection,
MRB
Year
Cum,
MRB
Cum since
start-up,
MRB
Jan-2023 176 9,403 173 9,753 9,753 2,318,606 8,890 8,890 2,323,634 -863 -863 5,028
Feb-2023 156 8,491 153 8,800 18,552 2,327,405 7,971 16,861 2,331,605 -828 -1,691 4,200
Mar-2023 168 9,180 169 9,517 28,069 2,336,922 8,593 25,454 2,340,198 -924 -2,615 3,276
Apr-2023 160 9,159 175 9,494 37,563 2,346,416 8,584 34,038 2,348,782 -910 -3,525 2,366
May-2023 156 8,886 161 9,203 46,766 2,355,619 7,901 41,939 2,356,683 -1,301 -4,827 1,064
Jun-2023 140 8,489 176 8,805 55,570 2,364,423 7,623 49,562 2,364,306 -1,182 -6,008 -117
Jul-2023 143 8,611 205 8,959 64,529 2,373,382 7,689 57,251 2,371,995 -1,270 -7,279 -1,388
Aug-2023 123 6,227 151 6,501 71,030 2,379,883 6,037 63,288 2,378,032 -464 -7,743 -1,852
Sep-2023 131 7,882 167 8,179 79,210 2,388,063 7,778 71,066 2,385,810 -401 -8,144 -2,253
Oct-2023 133 8,157 167 8,457 87,667 2,396,520 8,903 79,969 2,394,713 445 -7,698 -1,807
Nov-2023 130 8,285 178 8,593 96,260 2,405,113 8,705 88,674 2,403,418 112 -7,586 -1,695
Dec-2023 142 9,103 156 9,402 105,662 2,414,515 9,434 98,108 2,412,852 32 -7,554 -1,663
2023 Totals 1,758 101,873 2,032 105,662 98,108 -7,554
Produced Fluids Injected Fluids
Net Injection
(Injection - Production)
6. Oil Gravity:
44 API/47 API
8. Well Name and
Number:
9. API Number
50XXXXXXXXXXXX
NO DASHES
10. Type
See
Instructions
11. AOGCC
Pool Code
12. Zone 13. Perforated Intervals Top -
Bottom TVDSS
14. Final Test
Date
15. Shut-In
Time, Hours
16. Press.
Surv. Type
(see
instructions
for codes)
17. B.H.
Temp.
18. Depth
Tool TVDSS
19. Final
Observed
Pressure at
Tool Depth
20. Datum
TVDSS (input)
21. Pressure
Gradient, psi/ft.
22. Pressure at
Datum (cal)
NS-14A 50029230260100 O 590100 Ivishak 11091-11089 7/15/2023 2448 SBHP 254 11000 5159 11100 0.09 5169
NS-19 50029231220000 O 590100 Ivishak 10954-11069 7/16/2023 3840 SBHP 252 10900 5049 11100 0.08 5065
NS-20 50029231180000 O 590100 Ivishak 10958-11040 7/18/2023 3816 SBHP 250 10983 5150 11100 0.09 5162
NS-09 50029230520000 O 590100 Ivishak 10932-11030 8/21/2023 120 SBHP 251 11056 5092 11100 0.08 5097
NS-15 50029230730000 O 590150 Kuparuk 8940-8994 7/15/2023 1680 SBHP 190 9000 3098 9000 - 3098
NS-23 50029231460000 O 590150 Kuparuk 8953 - 9009 4/26/2023 - SBHP 201 9000 2937 9000 0.33 2937
NS-11 50029233030000 O 590100 Ivishak 10988 - 11058 8/22/2023 144 SBHP 256 11000 5096 11100 0.07 5103
NS-12 50029230910000 O 590100 Ivishak 10996 - 11057 8/22/2023 144 SBHP 252 11000 5089 11100 0.10 5099
NS-24 50029231110000 O 590100 Ivishak 10826 - 11047 8/24/2023 76368 SBHP 251 11020 5166 11100 0.10 5174
NS-20 50029231180000 O 590150 Kuparuk 9012 - 9059 11/22/2023 - SBHP 196 9000 3385 9000 0.17 3385
NS-24 50029231110000 O 590100 Sag 10717 - 10757 7/18/2023 75480 SBHP 250 10900 5304 11100 0.47 5397
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
RESERVOIR PRESSURE REPORT
1. Operator: 2. Address:
Printed Name
Title
Date
Reservoir Engineer
March 27, 2024Gavin Dittman
Certified Digital
Signature
23. All tests reported herein were made in accordance w ith the applicable rules, regulations, and instructions of the Alaska Oil and Gas Conservation Commission.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
7. Gas Gravity:
Northstar Unit
Hilcorp Alaska, LLC 3800 Centerpoint Dr Suite 1400, Anchorage, AK 99503
Northstar Field/Northstar Oil Pool &
Hooligan (Kuparuk) Oil Pools -11,100' TVDss/-9000' TVDss 0.75
3. Unit or Lease Name: 4. Field and Pool: 5. Datum Reference:
Page 4
Theoretical production is calculated for each Northstar producing well on a daily basis.
2023 Production Allocation Method
A well’s theoretical production is calculated using metered field volumes and hours on production as follows:
Gas Allocation
Gross Produced Gas = total return metered at test separator.
Net Produced Gas = Gross Produced Gas – Gaslift Gas.
Theoretical Produced Gas = all well tests Net Produced Gas prorated by the month.
(Proration calculation will include adjustments for shut in or downtime periods)
Field Gas Injection = metered prior to injection
Total Net Produced Gas = Field Gas Injection + Fuel Gas + Flare Gas + PPA Gas - Buy Gas
(Buy Gas = imported or Caribou Crossing acquired gas).
𝑇𝑜𝑡𝑎𝑙 𝑁𝑒𝑡 𝑃𝑟𝑜𝑑𝑢𝑐𝑒𝑑 𝐺𝑎𝑠
𝑇ℎ𝑒𝑜𝑟𝑒𝑡𝑖𝑐𝑎𝑙 𝑃𝑟𝑜𝑑𝑢𝑐𝑒𝑑 𝐺𝑎𝑠=𝐺𝑎𝑠 𝐴𝑙𝑙𝑜𝑐𝑎𝑡𝑖𝑜𝑛 𝐹𝑎𝑐𝑡𝑜𝑟
Gas Allocation Factor x Theoretical Produced Gas (individual well) = Allocated Gas (individual well).
Oil Allocation
Actual Field Oil Production = oil volume metered by LACT (sold/delivered to Northstar crude oil pipeline)
(Adjusted for BS&W, temperature, and API gravity in accordance with API standards and BSEE regulations.)
Gross Produced Oil = total return metered at test separator.
Theoretical Well Oil Production = all well tests Gross Produced Oil prorated by the month.
(Proration calculation will include adjustments for shut in or downtime periods)
Theoretical Field Oil Production = Sum of Theoretical Well Oil Production
Field Natural Gas Liquid (NGL) Production = metered prior to commingling with oil
𝐴𝑐𝑡𝑢𝑎𝑙 𝐹𝑖𝑒𝑙𝑑 𝑂𝑖𝑙 𝑃𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛+𝐹𝑖𝑒𝑙𝑑 𝑁𝐺𝐿 𝑃𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛
𝑇ℎ𝑒𝑜𝑟𝑒𝑡𝑖𝑐𝑎𝑙 𝐹𝑖𝑒𝑙𝑑 𝑂𝑖𝑙 𝑃𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛=𝑂𝑖𝑙 𝐴𝑙𝑙𝑜𝑐𝑎𝑡𝑖𝑜𝑛 𝐹𝑎𝑐𝑡𝑜𝑟
Oil Allocation Factor x Theoretical Well Oil Production = Allocated Oil Production (individual well).
Water Allocation
Actual Field Water Production = water volume metered prior to injection disposal
Net Field Water Production = Actual Field Water Production – Metered Grey Water
Gross Produced Water = total metered at test separator.
Theoretical Well Water Production = all well tests Gross Produced Water prorated by the month.
(Proration calculation will include adjustments for shut in or downtime periods)
Theoretical Field Water Production = Sum of Theoretical Well Water Production
𝑁𝑒𝑡 𝐹𝑖𝑒𝑙𝑑 𝑊𝑎𝑡𝑒𝑟 𝑃𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛
𝑇ℎ𝑒𝑜𝑟𝑒𝑡𝑖𝑐𝑎𝑙 𝐹𝑖𝑒𝑙𝑑 𝑊𝑎𝑡𝑒𝑟 𝑃𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛=𝑊𝑎𝑡𝑒𝑟 𝐴𝑙𝑙𝑜𝑐𝑎𝑡𝑖𝑜𝑛 𝐹𝑎𝑐𝑡𝑜𝑟
Water Allocation Factor x Theoretical Well Water Production = Allocated Water Production (individual well).
Page 5
F. & G. Future Development Plans & Review of Annual Plan of Operations and Development
In 2023, Hilcorp continued to maintained unit production through optimization opportunities. The field study of
the Northstar Unit continued. Well histories, production and injection data, material balance calculations,
geological, and geophysical work were studied and updated as necessary.
Projects completed during the 2023 calendar year:
NS-23 (Ivishak) – recomplete to the Kuparuk reservoir as a producer
NS-20 (Ivishak) - recomplete to the Kuparuk reservoir as a producer
NS-16A (Ivishak) - recomplete to the Kuparuk reservoir as a producer
NS-25 (Ivishak) – reperf
NS-24 (Ivishak) – remediate integrity issue and return to service as Ivishak gas injector (in progress)
NS-05 (Ivishak) – add perf
Projects planned for the 2024 calendar year:
In 2024, Hilcorp will pursue increased unit production through additional well intervention projects, any necessary
infrastructure and facility repairs, and other optimization opportunities as they arise.
No drilling activities are planned at Northstar within the 2024 calendar year.
Hilcorp will continue update the full field study of the Northstar Unit. This may include re-mapping productive
horizons, updating well histories, reviewing production and injection data, material balance calculations, and
reviewing results of any recent well intervention projects.
Sincerely,
Gavin Dittman
Reservoir Engineer - Northstar