Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout198-245 Pages NOT Scanned in this Well History File
XHVZE
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
J q ~/~/'-j'5 File Number of Well History File PAGES TO DELETE
RESCAN
Color items- Pages:
Grayscale, halftones, pictures, graphs, charts-
Pages:
Poor Quality Original- Pages:
Complete
[] Other- Pages:
DIGITAL DATA
~ Diskettes, No, ~
[] Other, No/Type
OVERSIZED
[] Logs of various kinds
[] Other
COMMENTS'
Scanned by:~ Mildred Daretha Nathan Lowell
[] TO RE-SCAN
Notes:
Re-Scanned by: Bevedy Mildred Daretha l~Lowell
Date: ~/~0 Isl ~
f r (STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMISSIO~ E C E IVE D
WELL COMPLETION OR RECOMPLETION REPORT AND LO&EC 2 9 2003
., , ^"'" ^ ^ ^
1a. Well Status: 0 Oil 0 Gas 0 Plugged 181 Abandoned 0 Suspended 0 WAG ""al'8.~~I~~s~~"Ò)' lIUII
20AAC 25.105 20AAC 25.110 0 cAReh:Qntgett 0 Exploratory
0 GINJ 0 WINJ 0 WDSPL No. of Completions Zero Other 0 Stratigraphic 181 Service
2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit Number
BP Exploration (Alaska) Inc. 10/14/2003 ' 198-245 303-292
3. Address: 6. Date Spudded 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 08/13/1999 50-029-22044-01-00
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Number
Surface: 09/02/1999 PBU S-24A
1633' SNL, 10~0' EW~, SEC. 35, T12N, R12E, UM 8. Elevation in feet (indicate KB, OF, etc.) .
Top of Productive HOrizon: -' 15. Field and Pool.
1844' NSL 1820' WEL SEC 27 T12N R12E UM KBE - 63.77 Prudhoe Bay Field / Prudhoe Bay
, ,.", Pool
Total Depth: 9. Plug Back Depth (MD+ TVD)
2584' NSL, 3948' WEL, SEC. 27, T12N, R12E, UM 12599' + 8928' Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+ TVD) 16. Lease Designation and Serial No.
Surface: x- 619212 y- 5979855 Zone- ASP4 12700' + 8918' Ft ADL 028258
TPI: x- 616283 y- 5983286 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit:
Total Depth: x- 614143 y- 5983994 Zone- ASP4 N/A MD
-- 19. Water depth, if offshore 20. Thickness of Permafrost
18. Directional Survey 0 Yes 181 No N/A MSL 1900' (Approx.)
21. Logs Run: "
MWD, GR, RES, NEU, DEN, Sonic, RFT, CBT, US IT
22. CASING, LINER AND CEMENTING RECORD
CASING '. SETTING DEPTH HOLE .
SIZE WT~ PERFT,' . GRADE. OP '. ,BOTTOM SIZE CEMENTING RECORD' AMOUNT PULLED
20" Insulated Conductor Surface 110' 8 cu yds Concrete
13-3/8" 68# L-80 Surface 2668' 17-1/2" 2580 cu ft Arcticset II & III
7" 26# L-80 34' 10180' 8-1/2" 1403 cu ft Class 'G'
4-1/2" 12.6# L-80 10003' 12687' 6" 432 cu ft Class 'G'
23. Perforations open to Production (MD + TVD of Top and 24.' '.', '" '" "", ",' 'tb'B~I~(3)REêÓRD''' '"",i.'i,:i'(~";',,;,i .,.'
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
None 4-1/2", 12.6#, L-80 10008' 9952'
MD TVD MD TVD
25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
12377' - 12597' Placed 56 Bbls CAC03/Flo-Pro Slurry --;;6
across perfs. Squeezed approximately ~1tÅ1
22 BBLs into perfs.
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
Not on Production N/ A
Date of Test Hours Tested PRODUCTION FOR Oll-Bsl GAs-McF WATER-BSl CHOKE SIZE I GAS-Oil RATIO
TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED + Oll-Bsl GAs-McF WATER-BSl all GRAVITy-API (CORR)
Press. 24-HoUR RATE
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None
_BFL 1E31.
Form 10-407 Revised 2/2003 CONTINUED ON REVERSE SIDE G (:;;
{'
'28. GEOLOGIC MARKER~ 29, FORMATION TESTS
Include and briefly summarize test results. List intervals tested,
NAME MD TVD and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Sag River 10182' 8724' None
Shublik 10232' 8765'
Sadlerochit I Zone 4B 10428' 8863'
Zone 4A 11510' 8983'
Zone 4A 11752' 9008'
Zone 4A 12232' 8967'
Sadlerochit 12685' 8920'
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble Title Technical Assistant Date'::L/:2.. 9 ~
PBU S-24A 198-245 303-292 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit NO.1 A roval No. Drilling Engineer: Mark Johnson, 564-5666
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 2/2003
( (
well: S-24B Accept: 11 /05/03
Field: Prudhoe Bay Unit Spud: 11/07/03
API: 50-029-22044-02 Release: 11/13/03
Permit: 203-163 Rig: Nordic #1
Date
PRE-RIG WORK
09/29/03
DRIFT W/ 3,80 CENT & SAMPLE BAILER TO TOP OF MCX, (S, BAILER EMPTY). RAN 41/2" EQ
PRONG TO MCX. PULLED MCX @ 2172\ SLM. SER# M-38B, .75 BEAN. TAGGED XN NIPPLE @
9966' SLM, S, BAILER ,EMPTY.
10/14/03
T/I/O= 1890/500/150, CAC03 SAND DUMP, PLACE A 56 BBL CAC03/FLO-PRO SLURRY ACROSS
PERFS TO SECURE WELL FOR CTD PREP. SQUEEZED APPROXIMATELY 22 BBLS THROUGH v
PERFS, 34 BBLS SLURRY ABOVE TOP SET OF PERF (2244') FINAL LINER LEAK OFF RATE 232
PSI/30 MINUTES, HESITATED SQUEEZE SEVERAL TIMES. INJECTIVITY RATE LESS THAN .1
BPM AT 1100 PSI WHP. SECURE WELL FOR NIGHT, DEAD CRUDE IN TUBING, SURFACE TO
3564'. LEFT 850 PSI ON TUBING.
10/15/03
T/I/0=900/0/480. FREEZE PROTECT FLOWLINE W/15BBLS NEAT METHANOL. PUMP 25 BBLS
CRUDE DOWN TBG, NOT EXCEDING 1200PSI. FINAL WHP; T/I/0=880/0/500,
10/17/03
PERFORM WEEKLY BOP TEST, RIH WITH 2.5" JSN WITH A 0.365" CENTER HOLE. RIH AND
HOLE WAS CLEAN TO PBTD. TAGGED PBTD AT 12,576' (UP DEPTH). HARD TAG W/CLEAN
PICKUP, ATTEMPTED TO JET OFF WITH FLO PRO AND 1% KCL W/O SUCCESS. PUMPED 10
BBL OF FLOW PRO SWEEP OFF BOTTOM W/PUH TO 12250' AND BACK DOWN TO 12576' CTMD
FOR FINAL FLO PRO SWEEP, MADE RETURNS CHECK W/40 BBL GAUGE TANK - RETURNS 92-
95% AT 2,5 BPM,
10/18/03
MADE FINAL 20 BBL FLO PRO SWEEP ON BOTTOM AT 12,576' CTMD AND CHASE OUT HZ
SECTION AT 40% AND THEN 80% TO SURFACE WHILE PUMPING 1% XSL KCL. MU 2-7/811 PDM
W/3.8011 DIAMOND SPEED MILL AND RIH TO 9926' CTMD', MILL XN NIPPLE AT 99851 CTD, MAKE 2
MILLING UP/DOWN PASSES AND 2 DRY PASSES, RIH TO TAG TD, HAD TO TURN MILL TO KEEP
FROM STACKING IN BUILD SECTION OF LINER WHILE RIH, MILLED OUT STICKY AREA IN
PERFS AT 12480' CTD, GET FINAL DRY TAG AT 125721 CTM, PUH ABOVE NIPPLES, CHECK
LOSSES, AVERAGE 17% WITH 650PSI WHP /6 - 80/0 AT 350PSI WHP, POOH FREEZE PROTECT
WELL WITH 60/40 METH TO 2500'. TRAP 500PSI ON WELL. MILL STILL GAUGES 3,8011 SHOWED
LITTLE WEAR. RDMO,
t (
BP EXPLORATION Page 1.
Operations Summary Report
Legal Well Name: S-24A
Common Well Name: S-24A Spud Date: 4/24/1990
Event Name: REENTER+COMPLETE Start: 11/5/2003 End: 11/13/2003
Contractor Name: NORDIC CALISTA Rig Release: 11/13/2003
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase Description of Operations
11/512003 17:00 - 17:30 0.50 MOB P PRE Safety meeting prior to moving off of S-1 02L 1.
17:30 - 18:30 1.00 MOB P PRE Move rig from S-102 L 1 to S-24 B.
18:30 - 19:00 0.50 MOB P PRE Safety meeting prior to moving over well s-24B.
19:00 - 19:30 0.50 MOB P PRE Move rig in over S-24 B.
19:30 - 21 :30 2.00 RIGU P PRE Set rig down over S-24. Begin nippling down swab cap, and
NU BOP stack. Call for berm crew to set tiger tank and
cuttings box. Spot KCL vac truck to on load water for
displacing freeze protect.
Accept rig at 19:30 hours.
21 :30 - 00:00 2.50 BOPSUF P PRE Weekly BOP pressure test. Witness waived by State of
Alaska, AOGCC, John Crisp.
11/6/2003 00:00 - 02:00 2.00 BOPSUF P PRE Continue with weekly BOP test. All items passed. no failures.
02:00 - 02:40 0.67 STMILL P WEXIT Pre spud meeting with rig crew to discuss well plan. Also
discuss plan forward for milling float equipment.
02:40 - 03:10 0.50 STMILL P WEXIT Check WHP. Well dead. Make up milling BHA as per
proceedure.
03: 10 - 05:25 2.25 STMILL P WEXIT RIH with BHA #1; 3.80 DSM, 3.80 string reamer, Baker
Extreme motor, PH6 MHA. Start mud downhole when at 9500'.
05:25 - 05:35 0.17 STMILL P WEXIT Tagged up at 12507'. PBTD should be equal to 12599'. Last
tag by service coil unit was at 12576'. PU, @ 44 klbs. Finish
circulating mud to bit. Pumping at 2.6/2.42/2050 psi. 93%
returns at this pump rate and pressure. Check mechanical vs
electrical depth counters to confirm accuracy. Both counters
agree. Assume that tag is CaC03 fill in hole.
05:35 - 05:50 0.25 STMILL P WEXIT Mud to bit. Begin milling on suspected fill. Pit vol=empty,
taking on mud thru coil. IAP=10 psi, OAP=81 psi. Tag up and
begin milling at 12506'. Seems to drill off reasonably easily. It
does not look to be the liner wiper plug. Broke thru after 3'.
Tag up again at 12606'. MAke a -7' correction to get on depth
to PBTD. Note, the correction used on the last well was -6', so
depths are consistent.
05:50 - 10:45 4.92 STMILL P WEXIT Begin milling liner wiper plug and landing collar. Mill landing
collar and float collar. Mill to 12,604'.
10:45 - 10:50 0.08 STMILL P WEXIT Back ream float collar and landing collar.
10:50 - 12:00 1.17 STMILL P WEXIT Pull up hole out of horizontal section to clean hole.
12:00 - 12:30 0.50 STMILL P WEXIT RIH from 10,250'.
12:30 - 13:45 1.25 STMILL P WEXIT Continue milling cement at 90 fph to 12,685'.
13:45 - 14:00 0.25 STMILL P WEXIT Back ream float equipment area at 12,600'.
14:00 - 14:50 0.83 STMILL P WEXIT Mill float shoe. Bust through shoe at 12,687.2'. RIH and tag
up at 12,700'.
14:50 - 15:20 0.50 STMILL P WEXIT Drill formation to 12,701'.
15:20 - 16:00 0.67 STMILL P WEXIT Start hi visco sweep down coil. Ream from 12,700' to 12,500'.
Drift from 12,480' to 12,701' with pump off. Pump sweep out
coil.
16:00 - 18:15 2.25 STMILL P WEXIT POOH pumping at 2.5 bpm. Hold pre spud meeting. Review
well plan hazards and mitigations with rig crew.
18:15 - 18:35 0.33 STMILL P WEXIT OOH. Stand back injector. Lay down motor and mills. DSM
3.80 in the hole, 3.78" OOH. String mill 3.80" in the hole, 3.79"
OOH.
18:35 - 19:10 0.58 STMILL P WEXIT MU BHA #2,3.125" Venturi basket.
Printed: 11/1712003 8:40:18 AM
( (
BP EXPLORATION Page 2""
Operations Summary Report
Legal Well Name: S-24A
Common Well Name: S-24A Spud Date: 4/24/1990
Event Name: REENTER+COMPLETE Start: 11/5/2003 End: 11/13/2003
Contractor Name: NORDIC CALISTA Rig Release: 11/13/2003
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase Description of Operations
11/6/2003 19:10-21:10 2.00 STMILL P WEXIT RIHwithBHA#2torunventurijunkbasketaccrossmilled
area. Pumps down while RIH.
21 :10 - 21 :30 0.33 STMILL P WEXIT 12590'. Kick on the pumps to 2.34 bpm, 3800 psi to activate
junk basket. Work down to TO at 30 fpm. No weight loss or
bobbles observed. Pull back up to 12590'. Repeat a second
time.
21 :30 - 23:00 1.50 STMILL P WEXIT POOH, continuing to circulate to pick up any heavier debris
that has been strung up the hole.
23:00 - 23:40 0.67 STMILL P WEXIT Tag up at surface. Send derrick hand up to stabbing boards to
confirm we are not icing up. Stand back injector. Dump the
venturi basket. Found very few pieces of debris. About 1/4
cup of small aluminum and formation pieces. Rig down Venturi
basket BHA.
23:40 - 00:00 0.33 DRILL P PROD1 Safety meeting prior to picking up first drilling BHA.
11/7/2003 00:00-01:15 1.25 DRILL P PROD1 MakeupBHA#3,firstOHlateralsectionBHA.4.125"Hycalog
bicenter bit, 1.2 deg Baker motor, Directional-GR, MHA.
Also rehead coil tubing. Pull test CTC to 35 klbs, PT to 4000
psi.
Stab on injector.
01 :15 - 03:30 2.25 DRILL P PROD1 RIH with first drilling BHA. Shallow hole test of orienter at
2770' passed ok, continue to bottom.
03:30 - 04:20 0.83 DRILL P PROD1 Log tie in pass up from 12590'. Make -21' correction.
04:20 - 04:45 0.42 DRILL P PROD1 Orient straight down. Attempt to orient in hole below shoe.
Can't get clicks. PU into casing and try to orient, no success.
RIH to bottom to stall motor and see what happens. Finally
managed to get orienter to work.
, ree Spin pSI at. pm. n I a ead from
12693'. Drilling at 2.6/2.15/3400 psi. ROP=40 fph. Taki
new mud. IAP=15 psi, OAP=107 psi.
05:30 - 08:40 3.17 DRILL P PROD1 Returns have improved as we get away from t old perfs.
2.50/2.45/3325 psi. Continuing to drill a to 12,772'.
08:40 - 08:50 0.17 DRILL P PROD1 Pull BHA into casing to make sure es not hang up on float
equipment. No problems.
08:50 - 12:40 3.83 DRILL P PROD1 Drill at 2.6/2.6 3,300 p. ~O L TF. 20 to 30 fph in shublik.
Drill to 12,865'. RO creasing, drilling in 24.
12:40 - 15:00 2.33 DRILL P PROD1 12865', POO U resistivity tool. Pump at 2.5 bpm while
POOH.
15:00 - 17:30 2.50 DRILL P PROD1 Sta ack injector. Change out MWD probe and pulser.
ange motor bend to 1.5 degree. Change bit to 3.75" OS 49
H+GJNU. PU resistivity tool. Confidence test MWD tools.
17:30 - 19:55 2.42 DRILL P RIH with BHA #4, RES tool, DS49 bit, 1.5 deg motor.
19:55 - 22:10 2.25 DRILL P Tag bottom. Set depth to last tagged depth of 12865'. Made a
-19' correction. Make a MAD pass for missing RES data and
tie in to previous run. Make a +6' correction.
22:10 - 22:20 PROD1 Orient to 110L.
22:20 - 00:00 PROD1 12871', Resume drilling at 2.5/2.4/3260 psi. Free spin 2800 psi
at 2.5 bpm. IAP=43 psi, OAP=126 psi. Pit vol=325 bbls.
ROP=50 fph.
11/8/2003 0.75 DRILL P PROD1 12947', Drilling ahead as per geo. 2.65/2.55/3450 psi. Pit
vol=313 bbls. IAP=51 psi, OAP=129 psi.
0.08 DRILL P PROD1 13005', Take a couple of clicks.
0.58 DRILL P PROD1 Resume drilling.
Printed: 11/17/2003 8:40:18AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25.280
1. Type of Request:
[] Abandon [] Suspend [] Operation Shutdown [] Perforate I-! Vadance [] Other
[] Alter Casing [] Repair Well [] Plug Perforations [] Stimulate [] Time Extension
[] Change Approved Program [] Pull Tubing [] Perforate New Pool [] Re-Enter Suspended Well [] Annular Disposal
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. [] Development [] Exploratory 198-245
'3. Address: [] Stratigraphic [] Service 6. APl Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22044-01-00
7. KB Elevation (ft): KBE = 63.77' 9. Well Name and Number:
PBU S-24A '/''
8. Property Designation: 10. Field / Pool(s):
ADL 028258 Prudhoe Bay Field / Prudhoe Bay Pool
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft):I Effective Depth MD (ft): IEffective Depth TVD (ft): Plugs (measured): Junk (measured):
12700' 8918' I . . 12599' I 8928' None None
:Casin~l ' Len~lthi:! i::,,i ::,.S,iZe.. :,:': ,,:~D i:::' :';,:",: BurSt : .:COllaPse
S,tr~q,t~iral
Conductor 110' 20" 110' 110'
Surface 2668' 13-3/8" 2668' 2668' 5020 2270
Intermediate 10146' 7" 10180' 8722' 7240 5410
PrQdu¢iQfl
Liner 2684' 4-1/2" 10003' - 12687' 8565' - 8919' 8440 7500
Perforation Depth MD (ft): I Perforation Depth TVD (ft):I Tubing Size: Tubing Grade: Tubing MD (ft):
12377'-12597'I I, 8950'-8928' 4-1/2", 12.6# L-80 10008' '
Packers and SSSV Type: 7" Baker 'S-3' packer; Packers and SSSV MD (ft): 9952'
4-1/2" HES SSSV Nipple 2195'
12. Attachments: 13. Well Class after proposed work:
[] Description Summary of Proposal [] BOP Sketch
[] Detailed Operations Program [] Exploratory [] Development [] Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: September 23, 2003 [] Oil [] Gas [] Plugged [] Abandoned
16. Verbal Approval: Date: [] WAG [] GINJ [] WINJ [] WDSPL
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Mark Johnson, 564-5666
Printed Name Mark Johnson ~ Title CT Drilling Engineer
~~,~_, ,., L i ~t.,,7,t.,~.~ ¢,~i~ ~/~,~ Prepared By Name/Number:
Signature (~.. ; '~-----'--Phone 564-5666 Date ~ Terrie Hubble, 564-4628
:.: ~,/~,"' Commission Use Only ~ '
C~m'/'' I Sundry Number: ~---"'~);~,, ~q ~
Conditions of approval: Notify mission so that a representative may witness -
[] Plug Integrity [] BOP Test [] Mechanical Integrity Test [] Location Clearance
Other:
Subsequent form required 10-
Approved By: ~h I:Nlllrt COMMISSIONER THE COMMISSION Date
Form 10-403 Revised 2/2003 Su)mit I ~ cate
ORIGINAL
To:
Winton Aubert
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Mark O. Johnson
CTD Engineer
Date: September 17, 2003
Re: P&A operations for well PBU S-24A as part of the CTD sidetrack
Well S-24A is scheduled for a through robing sidetrack with the SLB/Nordic 1 Coiled Tubing Drilling rig on
9/30/03. The sidetrack, S-24B (injection well), will exit out of the existing 4 ½" liner float shoe and 'target Zone
4 sands to the Northwest. The existing injection perforations in S-24A will be abandoned by liner cement from
the S-24B liner. The following describes work planned for the P&A and is submitted as an attachment to Form
10-403. A schematic diagram of the proposed sidetrack is attached for reference.
Pre CTD Summary (phase 1) .... 1) Slickline -Drift tubing. Pressure test IA to 3000 psi.
2) CT - Cleanout liner to PBTD. Drift with 3.8" mill to landing collar at 12599'.
CTD Sidetrack Summary (phase 2} 1) MIRU CTD rig.
2) Mill out shoe track with 3.80" OD diamond speed mill.
3) Drill 4 1/8" x 3.75" bicenter bit openhole sidetrack to ~14250' TD with MWD/gamma ray/resistivity.
4) Run 3 3/1.6" x 2 7/8" solid liner completion and cement with 26 Bbls of 1.5.8 ppg class G cement. WOC.
Pressure test liner and lap to 2000 psi. Run liner top packer if needed. P&A of S-24A is complete.
5) Perforate S-24 B liner
6) RDMO.
The pre CTD work is slated to begin on 9/23/03.
Mark O. Johnson / /
CTD Drilling Engi~r
564-5666, 240-8034
CC:
Well File
Sondra Stewman/Terrie Hubble
TREE= 4-1/8" Ck, V [ '[ -
WELLHEAD = McEV OY SAFETY NOTES: 9-5/8" CSG CUT, PULLED & MILLED
ACTUATOR= AXFI SON S 24A FROM SURFACE TO STUB @ 2739' HORIZONTAL LNR.
KB. FIL:~/ = 64.77' ~, 70° @ 10383' AND90° @ 11758'
BF. B. EV = 35.43' ., mmm · ~ m
KOP= 2782'
~X Angle = 97@12411 -,---,~ - t 2195' H4-1/2" I-ES SSSV NIP, ID = 3~813" I
Datum IVD = 10430' I O ,
DatUm 'rVD = 8800, SS
I .,:~-~,~,. ~. ~,, ,,,,-~,o,
MinimumlD=3.725"@9996' i~~~' 9941' H-1~"KN,,.,D=3.813"I
4-112" XN NIPPLE I XX)0(XX~ \. \\ ' ' ' ' '
-- I I
19-5/8"EZSV~J 3020' ~~ ~ '~X ' . ' '
IOLD9-5/8"CSI' G , '~ ~, ~ 9975' H4'1/2"XNIRID=3.813"I, , ,
I ~ ~4.1/Z, XN NiP, D = 3.725-
X'X~ X~ I 10004' ,~?ELMDTTLOGGED00/24/99 I
XX ,ooo
ITOP OF "112" LI"P' H :?03' ~
I 4.,.1/2" TBG, 12.6#, L-80, 0.0152 bpf, ID= 3.9
,
,~ bO~: 'X ..~
ANGLEATTOPPERF: 97
SIZE SPF INTERVAL Opn/Sc~z DATE ....
2-7/8" 4 12377-12597 O 09/99 14-1/Z'LNR, 12.6#,L-80,0.0152bpf, ID=3.958"H 12687'
DATE REV BY COIVIVIENTS I DATE ~ BY i COMIVE_NTS I PRUDHOEBAY UNIT
05/12/90 ORGINAL COk, PLETION = I I WELL: S-24A
09/07/99 SIDETRACK COMPLETION I , PERMIT No: 198-2450
03/14/01 SIS-IVl-I CONVERTED TO CANVAS I APl No: 50-029-22044-01
03/15/01 SIS-MD FINAL I SEC35, T12N, T12E
03/02/02 RN/TP CORRECTIONS ~ BP Exploratbn (Alaska)
,,,
SIZE SPF INTERVAL Opn/S(:lz DATE
2-7/8" 4 12377 - 12597 O 09/99
DATE REV BY COIVlVIENTS DATE ~ BY COMk/F_NTS
05/12/90 ORGINAL COIVPLETION
09/07/99 SIDETRACK COMPLETION
03/14/01 SIS-k/Il CONVERTED TO CANVAS
03/1 5/01 SIS-MD FINAL
03/02/02 RN/'rP CORRECTIONS
,,,
~ = 4-1/8" ClW
WELLHEAD = McEVOY
A~TOR = AXELSON
KB. ELEV = 64.77'
BF. ELEV = 35.43'
KOP = 2782'
Max Angle = 97 @ 12411'
Datum MD = 10430'
Datum TVD = 8800''ss
S-24B
Proposed CTD Sidetrack
FSi;- OTES: 9-518" CSG CUT, PULLED & MILLED
.... "{FACETO STUB @ 2739' HORIZONTAL LNR.
70° @ 10383' AND 90° @ 11758'
2195' H4-1/2" HES SSSV NIP, ID = 3.813"
I ~-~"' c~, ~, ~0, ~: ~..~- H 2668'
I~o.o~c~ I-I 2669' r
I.-~,~.~svl-I 3020' I
IMinimum ID = 3.725" @ 9996' I
4-112" XN NIPPLE (milled to 3.8")
IOLD 9-5/8" CSG
ITOPOF 4-112" LNR Id 10003'
I4-112" 'rBG, 12.6#, L-80, 0.0152 bpf, ID = 3.958"
10008'
9952'
9941'
9975'
9996'
10004'
10008'
H7" BAKER S-3 PKR, ID= 3.875"
I--14-1/2" x N,=, ID = 3.813"
ELMD TT LOGGED 09/24/99
4-1/2" W/LEG, ID = 4.00"
I 7" LNR, 26~, L-80 MOD, 0.0383 bpf, ID = 6.276" 10180'
PERFORATION SUMMARY
REF LOG:
ANGLEATTOP PERF: 97 @ 12377'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-7/8" 4 12377 - 12597 isolated proposed
ImT~ I-I ~2s~'
I 4-1/2" LNR, 12.6#, L-80, 0.0152 bpf, ID = 3.958" Id 12687'
I 11100' IdTop of 3-3/16" Liner
[~~ 13325' Id3-3/16 x 2-7/8 X-over I
] 3-3/16"X 2-7/8" crnt'ed and perfedld 14250'
DATE REV BY COMMENTS DATE REV BY COMMENTS
05112/g0 ORGINAL COMPLETION
'0gl07199 SIDETRACK COMR. ETION
03/14/01 SIS-MH CONVERTED TO CANVAS
03/15/01 SIS-MD FINAL
'03/02102 RN/'I'P CORRECTIONS
PRUDHOE BAY UNIT
WELL: S-24A
PERMIT NO: 198-2450
APl No: 50-029-22044-01
SEC 35, T12N, T12E
BP Exploration (Alaska)
0 0
z fi'
[ i
198-245-0 PRUDHOE BAY UNIT S-24A 50- 029-22044-01 BP EXPLORATION
(ALASKA) INC
Roll #1: Start: Stop Roll #2: Start Stop
MD 12700 TVD 08918 Completion Date: "~)/7~9 Completed Status: lWlNJ Current: WAGIN
T Name Interval
c 9348 .~ 1 SCHLUM CBL
C 9391 ~- 1-5 SCHLUM GR
L CBL FINAL 7100-10260 9/4/99
L GR/RES-MD t~J- FINAL 2669-12699
L GR/RES-TVD ~-~ FINAL 2572-8920 INVERTED
L USIT
R SRVY RPT J
FINAL BL(C) 7100-10260 9/4/99
SCHLUM 0-12699.
Sent Received T/C/D
CH 10/6/99 10/13/99
OH 11/23/99
CH 5 10/6/99 10/13/99
OH 2/5 11/17/99 11/23/99
OH 2/5 11/17/99 11/23/99
OH 5 10/6/99 10/13/99
OH 10/22/99 10/25/99 D
Wednesday, June 20, 2001
Page 1 of I
11/17/99
GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
All'N: Sherrie
NO. 12940
Company:
Field:
Alaska Oil & Gas Cons Corem
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Open Hole)
Well Job # Log Description Date BL Sepia CD
S-24A1:~ I. x tC- 99356 IMPULSE/GR 990903 1
S-24A / 99356 MD GR-RES 990903 1 1
S-24A~ 99356 TVD GR-RES 990903 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
RECEIVED
;0',/2~ 1999
Alaska Oil & Gas Cons. Commission
Schlumberger GeoQuest
3940 Arctic BI 3940 Arctic Blvd, Suite 300
Anchorage, / Anchorage, AK 99503-5711
Al-tN: Sho~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
RECEIVED
WELL COMPLETION OR RECOMPLETION REPORT AND L~T 2 5 1999
1. Status of Well Classificat~~i~'~ll$ Commissji;
[] Oil [] Gas [] Suspended [] Abandoned [] Service Ap~..h,,nr,,.,:,.~. '
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 98-245
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22044-01
. I1~1 I
4. Location of well at surface
1633' SNL, 1050' EWL, SEC. 35, T12N, R12E, UM ;" ~'i~'i?'~iiii~?~i?i~i' -~_~~ 9. Unit or Lease Name
'- ~11~1~ Prudhoe Bay Unit
At top of productive interval i ~__~ 10. Well Number
1843' NSL, 1826' WEL, SEC. 27, T12N, R12E, UM i ~- S-24Ai
At
total
depth
~ 11. Field and Pool
2585' NSL, 3957' WEL, SEC. 27, T12N, R12E, UM : .......- o ~
Prudhoe Bay Field / Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool
KBE = e3.77'I ADL 028258
12. Date Spudded8/13/99 I13' Date T'D' Reached ! 14' Date C°mp" Susp" °r Abandl15' Water depth' if OffshOre 16' NO' Of COmpletiOns9/2/99 9/7/99 N/A MSL One
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 19. Directional Survey pO. Depth where SSSV set]21. Thickness of Permafrost
12700 8918 FTI 12599 8928 FT [~Yes [-JNo! (Nipple) 2195' MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, GR, RES, NEU DEN, Sonic, RFT, CBT, USIT ~D I ¢' I ,",,,! Ii/
23. CASING, LINER AND CEMENTING RECORD
L
CASING SE-FrING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BO'FrOM SIZE CEMENTING RECORD AMOUNT PULLED
20" Insulated Conductor Surface 110' Bcu yds Concrete
13-3/8" 68# L-80 Surface 2668' 17-1/2" 2580 cu ft Arcticset II & III
7" 26# L-80 34' 10180' 8-1/2" 1403 cuft Class 'G'
4-1/2" 12.6#' L-80 10003' 12687' 6" 432 cu ft Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
2-7/8" Gun Diameter, 4 spf 4-1/2", 12.6#, L-80 10008' 9952'
MD TVD MD TVD
12377 - 12597' 8950' - 8928'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 80 Bbls of Diesel
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
September 25, 1999 I Water & Gas Injection
Date of Test Hours Tested PRODUCTION FOR OIL-EEL GAS-MCF WATER-EEL CHOKE SIZE I GAS-OIL RATIO
I
TEST PERIOD
Flow Casing Pressure CALCULATE OIL-EEL GAS-MCF WATER-EEL OIL GRAViTY-APl (CORR)
Tubing D 24-HOUR
I3Z~.SS. RATE CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered and
Marker Name
Depth Depth gravity, GOR, and time of each phase.
Sag River 10182' 8723'
Shublik 10232' 8765'
Sadlerochit / Zone 4B 10428' 8863'
Zone 4A 11510' 8983'
Zone 4A 11752' 9008'
Zone 4A 12232' 8967'
Sadlerochit 12685' 8920'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I herebYsigned certify that the foregoipg..,~~is, true__and correct to the best of my knowledge/~:~' '(~
TerrieHubble Title Technical Assistant III Date I0
S-24Ai 98-245 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other
spaces on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in
item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each
additional interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Facility
Date/Time
07 Aug 99
08 Aug 99 01:30
PBS Pad
Progress Report
Well S-24A Page
Rig Nabors 9ES Date
1
08 September 99
04:30-06:00
04:30-05:00
05:00
05:00-06:00
06:00-11:00
06:00-11:00
11:00
11:00-12:30
11:00-12:30
12:30
12:30-13:30
12:30-13:30
13:30
13:30-16:30
13:30-14:00
14:00
14:00-16:30
16:30
16:30-19:30
16:30-17:30
17:30
17:30-19:30
19:30
19:30-21:30
19:30-21:30
21:30
21:30-02:00
21:30-01:30
Duration
1-1/2 hr
1/2hr
lhr
5hr
5hr
1-1/2 hr
1-1/2 hr
lhr
lhr
3hr
1/2 hr
2-1/2 hr
3hr
lhr
2hr
2hr
2hr
4-1/2 hr
4hr
Activity
Move rig
Held safety meeting
Completed operations
Rig moved 10.00 %
Level and spot matting boards at cellar location.
Lay Herculite. Spot sub, mud pits and shop. Set
cuttings tank. Berm containment under rig and hook
up lines.
Move rig (cont...)
Rig moved 100.00 % (cont...)
Level and spot matting boards at cellar location.
Lay Herculite. Spot sub, mud pits and shop. Set
cuttings tank. Berm containment under rig and hook
up lines.
At well location - Cellar
Rig accepted at 1100 hrs 8/7/99.
Fluid system
Fill pits with Fresh water
Fill pits. R/U secondary annular valve on casing
spool and hook up lines to circ freeze protect from
well.
Completed operations
Wellhead work
Removed Hanger plug
Pulled BPV w/lubricator.
Equipment work completed
Fluid system
Held safety meeting
Held pre-spud meeting.
Completed operations
Circulated at 4512.0 ft
Finished R/U and circulated freeze protect diesel
from well.
Hole displaced with Fresh water - 100.00 % displaced
Wellhead work
Installed Hanger plug
Set TWC and tested to 1000 psi from below. Tested
tree to 5000 psi.
Equipment work completed
Removed Xmas tree
N/D tree and adapter. Function lock down screws on
tubing hanger.
Equipment work completed
Nipple up BOP stack
Installed BOP stack
Equipment work completed
Test well control equipment
Tested BOP stack
R/U and tested BOP's. Hydril 250/3500 psi. Pipe
rams, blind rams, choke and kill line valves, floor
safety valves, choke to 250/4000 psi. Unable to
complete test on lower pipe rams, xo in way. Test
witnessed by C. Scheve, AOGCC.
Pressure test completed successfully - 4000.000 psi
Progress Report
Facility PBS Pad
Well S-24A Page 2
Rig Nabors 9ES Date 08 September 99
Date/Time
01:30-02:00
02:00
02:00-06:00
02:00-03:00
03:00
03:00-06:00
06:00
06:00-06:30
06:00-06:30
06:30
06:30-08:00
06:30-07:30
07:30
07:30-08:00
08:00
08:00-14:30
08:00-10:30
10:30
10:30-11:00
11:00
11:00-13:00
13:00
13:00-14:30
14:30
14:30-15:30
14:30-15:30
15:30
15:30-03:30
15:30-17:30
17:30
17:30-18:30
18:30
18:30-23:00
23:00
23:00-01:00
Duration
1/2 hr
4 hr
lhr
3hr
1/2 hr
1/2 hr
1-1/2 hr
lhr
1/2 hr
6-1/2 hr
2-1/2 hr
1/2 hr
2hr
1-1/2 hr
lhr
lhr
12hr
2hr
lhr
4-1/2 hr
2hr
Activity
Retrieved Hanger plug
Equipment work completed
Pull Single completion, 4-1/2in O.D.
Pulled Tubing on retrieval string to 24.0 ft
M/U landing jt and BOLDS. Pulled tubing to floor.
L/D landing jt and tubing hanger.
Completed operations
Laid down 4512.0 ft of Tubing
L/D tubing at report time. Installing thread
protectors to salvage tubing.
107 joints laid out
Recovered 107 jts tbg plus XN nipple plus 20.50'
cut it.
Pull Single completion, 4-1/2in O.D. (cont...)
Removed Tubing handling equipment
Equipment work completed
Test well control equipment
Tested Bottom ram
P/U test jt and tested lower pipe ram to 250/4000
psi. R/D equipment.
Pressure test completed successfully - 4000.000 psi
Installed Wear bushing
Eqpt. work completed, running tool retrieved
4-1/2in. Drillpipe workstring run
Ran Drillpipe in stands to 3020.0 ft
PFU EZSV bridge plug and RIH.
At Setting depth: 3020.0 ft
Installed Bridge plug
Set and released form EZSV. Set 25K down to
confirm set.
Equipment work completed
Circulated at 3020.0 ft
Pump 30 bbls water spacer and displaced to 9.6 ppg
mud. 10 bpm, 375 psi. Mixed and spotted 18 ppg
milling pill to 2820'.
Hole displaced with Water based mud - 100.00 % displaced
Pulled Drillpipe in stands to 0.0 ft
At Surface: 0.0 ft
Planned maintenance
Serviced Block line
Line slipped and cut
BHA run no. 1
Made up BHA no. 1
P/U section milling BHA.
BHA no. 1 made up
R.I.H. to 2799.0 ft
Locate casing collar at 2799.
x"~l Stopped · To correlate depth Milled Casing at 2794.0 ft
P/U 6' above collar and begin section milling @
2794'. Milled to 2797'. Recovered 15(D metal.
At Kick off depth: 2797.0 ft
Circulated at 2797.0 ft
Mix and pump sweep. Circ 14 bpm, 1325 psi.
Facility PBS Pad
Duration
1 hr
1-1/2 hr
Date/Time
09 Aug 99 01:00
01:00-02:00
02:00
02:00-03:30
1 hr
1 hr
03:30
03:30-04:30
03:30-04:30
04:30
04:30-06:00
04:30-05:00
05:00
05:00-06:00
1-1/2 hr
1/2 hr
1 hr
1 hr
05:00-06:00
2 hr
2 hr
06:00-08:00
06:00-08:00
2 hr
2 hr
08:00
08:00-10:00
08:00-10:00
1 hr
1 hr
10:00
10:00-11:00
10:00-11:00
2-1/2 hr
2-1/2 hr
11:00
11:00-13:30
11:00-13:30
1 hr
1/2 hr
1/2 hr
1 hr
1/2 hr
13:30
13:30-14:30
13:30-14:00
14:00
14:00-14:30
14:30
14:30-15:30
14:30-15:00
Progress Report
Well S-24A Page 3
Rig Nabors 9ES Date 08 September 99
Activity
Hole swept with slug - 400.00 % hole volume
Pulled out of hole to 673.0 ft
At BHA
Pulled BHA
Stand back HWDP and DC's. L/D jars and section
mill.
BHA Stood back
Fluid system
Circulated at 26.0 ft
R/U and circ to clean stack. Attempted to
circulate thru 13-3/8" annulus, pressure to 400 psi, 12.5
ppg EMW, no circulation.
Stopped · To change handling equipment
Wellhead work
Removed Wear bushing
Equipment work completed
Removed Seal assembly
Pulling 9-5/8" packoff at report time.
Removed Seal assembly
Pull 9-5/8" packoff thru stack. Packoff damaged,
had to modify running tool. Recovered packoff.
Wellhead work (cont...)
Removed Seal assembly (cont...)
Pull 9-5/8" packoff thru stack. Packoff damaged,
had to modify running tool. Recovered packoff.
Equipment work completed
Pull Casing, 9-5/8in O.D.
Pulled Casing on retrieval string to 25.0 fi
PFU 9-5/8" spear and packoff assembly. Catch
casing below hanger. Worked pipe to 350K, 400 psi on
pump. 2' pipe movement at surface, no circulation.
Stopped · To flowcheck well
Well control
Flow check
Gas breaking out of crude/diesel freeze protect in
annulus. Closed annular and took gas expansion to
gas buster. Well unloaded 37 bbls fluid. No shut
in pressure. Lubricate well, took 37 bbls to
fill.
Observed well static
Pull Casing, 9-5/8in O.D.
Worked stuck pipe at 2797.0 fi
Work pipe to 400K. Pressure to 600 psi attempting
to bread circulation. Unable to free casing.
Release spear.
Aborted attempts to work Casing free at 2797.0 ft
Wellhead work
Installed Seal assembly
Eqpt. work completed, running tool retrieved
Installed Wear bushing
Eqpt. work completed, running tool retrieved
Fluid system
Reverse circulated at 2797.0 ft
Attempted to circulate down casing annulus.
Facility
Date/Time
10 Aug 99
Progress Report
PBS Pad
Well S-24A Page 4
Rig Nabors 9ES Date 08 September 99
15:00
15:00-15:30
15:30
15:30-21:00
15:30-16:00
16:00
16:00-17:00
17:00
17:00-18:00
18:00
18:00-19:30
19:30
19:30-20:30
20:30
20:30-21:00
21:00
21:00-21:30
21:00-21:30
21:30
21:30-23:00
21:30-23:00
23:00
23:00-23:30
23:00-23:30
23:30
23:30-06:00
23:30-00:30
00:30
00:30-03:00
03:00
03:00-03:30
03:30
03:30-06:00
03:30-06:00
06:00-13:00
Duration
1/2 hr
5-1/2 hr
1/2 hr
1 hr
1 hr
1-1/2 hr
1 hr
1/2 hr
1/2 hr
1/2 hr
1-1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
6-1/2 hr
1 hr
2-1/2 hr
1/2 hr
2-1/2 hr
2-1/2 hr
7 hr
Activity casing.
Stopped: To hold safety meeting
Held safety meeting
Held Technical Limit/Safety Meeting with T. Bunch
and D. Abert.
Completed operations
BHA run no. 2
Made up BHA no. 2
PFLI hydraulic multicutter tool.
BHA no. 2 made up
R.I.H. to 2659.0 ft
At 13-3/8in casing shoe
To cutting point 10' above 13-3/8" casing shoe.
Cut Casing at 2659.0 ft
Cut casing with multicutter.
Completed operations
Circulated at 2659.0 ft
Open 13-3/8" annular valve and allow 9.6 ppg mud to
U-tube crude/diesel freeze protect to outside tank.
Recovered 100 bbls freeze protect.
Hole displaced with Water based mud - 100.00 % displaced
S/I to allow oil/gas/mud mixture to separate.
Pulled out of hole to 654.4 ft
At BHA
Pulled BHA
L/D casing cutter.
BHA Stood back
Wellhead work
Removed Wear bushing
Equipment work completed
Fluid system
Circulated at 2659.0 ft
Closed blind rams and circulated thru cut in 9-5/8"
casing.
Obtained bottoms up (100% annulus volume)
Wellhead work
Retrieved Seal assembly
Pulled 9-5/8" packoff.
Equipment work completed
Pull Casing, 9-5/8in O.D.
Pulled Casing on retrieval string to 40.0 ft
RIH. Latch casing w/spear. Pulled to floor,
145K. Released spear.
Fish at surface
Rigged up Casing handling equipment
Equipment work completed
Circulated at 2659.0 ft
Pump pill.
Heavy slug spotted downhole
Laid down Casing of 1200.0 ft
Lay down 9-5/8" casing at report time.
Laid down Casing of 1200.0 ft
L/D 9-5/8" casing. Recovered 67jts + 15' cut jr.
Recovered 11 turbulators.
Pull Casing, 9-5/8in O.D. (cont...)
Facility
Date/Time
11 Aug 99
Progress Report
PBS Pad
Well S-24A
Rig Nabors 9ES
Page 5
Date 08 September 99
06:00-11:00
11:00
11:00-13:00
13:00
13:00-22:00
13:00-14:30
14:30
14:30-15:30
15:30
15:30-17:30
17:30
17:30-19:30
19:30
19:30-20:30
20:30
20:30-21:30
21:30
21:30-22:00
22:00
22:00-22:30
22:00-22:30
22:30
22:30-23:00
22:30-23:00
23:00
23:00-06:00
23:00-00:30
00:30
00:30-01:30
01:30
01:30-06:00
01:30-06:00
06:00-04:30
06:00-16:30
16:30
16:30-17:30
17:30
Duration
5 hr
2 hr
9 hr
1-1/2 hr
1 hr
2 hr
2 hr
1 hr
1 hr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
7 hr
1-1/2 hr
1 hr
4-1/2 hr
4-1/2 hr
22-1/2 hr
10-1/2 hr
1 hr
Activity
Laid down 2659.0 ft of Casing (cont...)
L/D 9-5/8" casing. Recovered 67 jts + 15' cut jt.
Recovered 11 turbulators.
67 joints laid out
Rigged down Casing handling equipment
R/D and clean rig floor.
Equipment work completed
BHA run no. 3
Made up BHA no. 3
Fishing BHA, spear.
BHA no. 3 made up
R.I.H. to 2659.0 ft
At Top of fish: 2659.0 ft
Fished at 2659.0 ft
Latched fish. Jarred 225K to 275K. Attempted to
pump. No-go. Good jalTing action.
Released fish
Abandoned effort to pull fish free.
Serviced Top drive
Inspected derrick and top drive. Repaired sheared
bolts in top drive cover plate.
Equipment work completed
Pulled out of hole to 700.0 ft
At BHA
Pulled BHA
L/D fishing spear, bumper sub, accelerator jars.
BHA Stood back
Removed Drillfloor / Derrick
Clear floor, P/U Baker tools.
Equipment work completed
Planned maintenance
Serviced Top drive
Equipment work completed
Wellhead work
Installed Wear bushing
Eqpt. work completed, running tool retrieved
BHA run no. 4
Made up BHA no. 4
Milling BHA.
BHA no. 4 made up
R.I.H. to 2659.0 ft
At Top of fish: 2659.0 ft
Milled Casing at 2670.0 ft
Milling ahead, 4.5 '/hr. 2670' at report time.
Milled Casing at 2670.0 ft
Milled casing to 2726'. S/D to make a connection.
BHA run no. 4 (cont...)
Milled Casing at 2726.0 ft (cont...)
Milled casing to 2726'. S/D to make a connection.
Began precautionary measures
Investigated pressure change
Wad of mill cuttings backing up flowline and bell
nipple. Clean same.
Completed operations
Facility
Date/Time
12 Aug 99
Progress Report
PBS Pad
Well S-24A Page 6
Rig Nabors 9ES Date 08 September 99
17:30-20:00
20:00
20:00-20:30
20:30
20:30-23:30
23:30
23:30-02:00
02:00
02:00-03:00
03:00
03:00-04:30
04:30
04:30-06:00
04:30-05:30
05:30
05:30-06:00
06:00
06:00-09:15
06:00-08:00
08:00
08:00-08:15
08:15
08:15-08:30
08:30
08:30-09:00
09:00
09:00-09:15
09:15
09:15-10:00
09:15-10:00
10:00
10:00-13:00
10:00-10:30
10:30
10:30-12:00
Duration
2-1/2 hr
1/2 hr
3 hr
2-1/2 hr
1 hr
1-1/2 hr
1-1/2 hr
1 hr
1/2 hr
3-1/4 hr
2 hr
1/4 hr
1/4 hr
1/2 hr
1/4 hr
3/4 hr
3/4 hr
3 hr
1/2 hr
1-1/2 hr
Activity
Milled Casing at 2739.0 ft
Finished milling 70' window for kick off.
At Window: 2739.0 ft
Circulated at 2739.0 ft
Circulate sweep. Flowline plugged off before sweep
returns.
Stopped: To service drilling equipment
Rigged down Flowline
Break flowline apart and unplug flowline. Cuttings
ball plugging flowline.
Equipment work completed
Circulated at 2739.0 ft
Obtained clean returns - 400.00 % hole volume
Pump sweeps, clean metal from hole.
Pulled out of hole to 672.0 ft
At BHA
Pulled BHA
L/D mills. 20% wear on mill.
BHA Stood back
4in. Drillpipe workstring run
Ran Drillpipe in stands to 2669.0 fl
RIH w/muleshoe.
At 13-5/8in casing shoe
Washed to 2820.0 ft
Wash to 2820' at report time. (Top of 18 ppg
pill.)
At Setting depth: 2820.0 ft
Bottom of cement plug.
4in. Drillpipe workstring run (cont...)
Circulated at 2820.0 ft
Hole swept with slug - 200.00 % hole volume
Pulled Drillpipe in stands to 2615.0 ft
At top of check trip interval
Ran Drillpipe in stands to 2820.0 ft
No resistance.
Stopped: To circulate
Circulated at 2820.0 ft
Stopped: To hold safety meeting
Held safety meeting
Held PJSM w/Dowell.
Completed operations
Cement: Kickoff plug
Mixed and pumped slurry - 65.000 bbl
Pump 5 bbls H20. Test lines to 3000 psi. Pump 35
bbls H20, 65 bbls cmt, 3 bbls H20. Displace with
17.5 bbls 9.6 ppg mud.
Cement pumped
CIP 1000 hrs 8/12/99.
4in. Drillpipe workstring run
Pulled Drillpipe in stands to 2150.0 ft
Stopped: To circulate
Circulated at 2150.0 ft
Circulate and clean hole. Got 2 bbls cmt
contaminated mud to surface.
Facility
Date/Time
13 Aug 99
Progress Report
PBS Pad
Well S-24A
Rig Nabors 9ES
Page 7
Date 08 September 99
12:00
12:00-13:00
13:00
13:00-14:30
13:00-13:30
13:30
13:30-14:00
14:00
14:00-14:30
14:30
14:30-17:00
14:30-15:00
15:00
15:00-17:00
17:00
17:00-06:00
17:00-19:00
19:00
19:00-20:00
20:00
20:00-20:30
20:30
20:30-22:30
22:30
22:30-23:00
23:00
23:00-06:00
06:00-12:00
06:00-07:00
07:00
07:00-10:00
10:00
10:00-11:00
11:00
11:00-12:00
12:00
12:00-18:00
12:00-17:00
17:00
17:00-18:00
Duration
1 hr
1-1/2 hr
1/2 hr
1/2 hr
1/2 hr
2-1/2 hr
1/2 hr
2 hr
13hr
2 hr
1 hr
1/2 hr
2 hr
1/2 hr
7 hr
6 hr
1 hr
3 hr
1 hr
1 hr
6 hr
5 hr
1 hr
Activity
Obtained clean returns - 150.00 % hole volume
Pulled Drillpipe in stands to 0.0 ft
Pump pill and POH. L/D muleshoe.
At Surface: 0.0 ft
Wellhead work
Removed Wear bushing
Equipment work completed
Circulated at 25.0 ft
Washed stack with perforated joint. Functioned
BOP's.
Stopped: To service drilling equipment
Installed Wear bushing
Eqpt. work completed, running tool retrieved
Planned maintenance
Serviced Drillfloor / Derrick
Cleared and cleaned rig floor.
Equipment work completed
Serviced Rotary table
Level rig. Settling moved rig off center.
Equipment work completed
BHA run no. 5
Made up BHA no. 5
BHA no. 5 made up
R.I.H. to 2364.0 ft
RIH to 2100'. Washed to 2364', TOC.
Observed 20.00 klb resistance
Drilled cement to 2397.0 ft
Stopped to test casing
Circulated at 2397.0 ft
Obtained clean returns - 150.00 % hole volume
Cement contaminated mud.
Tested Casing - Via annulus
Tested 13-3/8" casing to 2500 psi for 30 min, bled
off 178 psi, OK.
Pressure test completed successfully - 2500.000 psi
Drilled cement to 2610.0 ft
Drilling hard cement. (Very hard) 30K wob, 100
rpm, 650 gpm. Drilling cement at report time.
BHA run no. 5 (cont...)
Drilled cement to 2669.0 ft
Finished drill cement to 13-3/8" csg shoe.
Completed operations
Circulated at 2669.0 ft
Circ and cond cement contaminated mud.
Obtained clean returns - 300.00 % hole volume
Pulled out of hole to 932.0 ft
At BHA
Pulled BHA
L/D steel DC's, stood back HWDP.
BHA Laid out
BHA run no. 6
Made up BHA no. 6
BHA no. 6 made up
R.I.H. to 2400.0 ft
Facility
Date/Time
PBS Pad
Duration
18:00
18:00-19:00
18:00-18:30
18:30
18:30-19:00
19:00
19:00-06:00
19:00-22:00
1 hr
1/2 hr
1/2 hr
llhr
3 hr
22:00
22:00-03:00
14 Aug 99 03:00
03:00-04:30
04:30
04:30-05:00
05:00
05:00-06:00
06:00-06:00
06:00-06:30
06:30
06:30-08:00
08:00
08:00-09:00
09:00
09:00-10:00
10:00
10:00-11:00
5 hr
1-1/2 hr
1/2 hr
1 hr
24hr
1/2 hr
1-1/2 hr
1 hr
1 hr
1 hr
11:00
11:00-21:00
21:00
21:00-22:00
22:00
22:00-23:00
10hr
1 hr
1 hr
Progress Report
23:00
23:00-00:30
Well S-24A Page 8
Rig Nabors 9ES Date 08 September 99
1-1/2 hr
Activity
Began precautionary measures
Planned maintenance
Serviced Block line
Line slipped
Serviced Top drive
Equipment work completed
BHA run no. 6
Rigged up Logging/braided cable equipment
Held PJSM. R/U Schlumberber wireline sheave and
side entry sub. RIH w/gyro and latch up.
Equipment work completed
Drilled to 2745.0 ft
Time drilled to 2745' kicking off cement plug.
Build rate unacceptable - Unable to orientate string
POH w/wireline to rotate.
Removed Logging/braided cable equipment
POH and R/D Schlumberger/Gyrodata.
Equipment work completed
Drilled to 2775.0 ft
Rotate 30'.
Build rate unacceptable - Unable to orientate string
Planned rotation.
Rigged up Logging/braided cable equipment
R/U Schlumberger and Gyrodata. RIH. Prepare to
slide ahead.
BHA run no. 6 (cont...)
Drilled to 2815.0 ft
Slide from 2775' to 2815'.
Reached planned end of run - Directional objective met
Rigged down Survey wireline unit
POH w/wireline and stand back Schlumberger.
Equipment work completed
Drilled to 2904.0 ft
L/D side entry sub. Drilled ahead to 2904'.
Stopped: To take survey
Rigged up Survey wireline unit
R/U Schlumberger and ran gyro.
Equipment work completed
Rigged down Survey wireline unit
R/D and released Schlumberger and Gyrodata.
Work completed, equipment laid out
Drilled to 3745.0 ft
Drilled ahead sliding as required for angle and
direction. AST=5.5 hrs ART=3.0 hrs
Began precautionary measures
Circulated at 3745.0 ft
Circulated sweep.
Obtained clean returns - 100.00 % hole volume
Pulled out of hole to 2600.0 ft
Hole swabbing, backream as necessary.
At top of check trip interval
R.I.H. to 3373.0 ft
RIH. Tight at 3373'. Appeared to be pushing
boulder downhole. Hung up in slide interval at 3373'.
·
Orient ~-~' attempt to ..... ~- "~-' °:-' .... '-~' '~: '-
~llU W~Lall unu. o,ucuau~wu
Facility PBS Pad
Date/Time Duration
15 Aug 99 00:30
00:30-06:00 5-1/2 hr
06:00-12:30 6-1/2 hr
06:00-07:00 1 hr
16 Aug 99
07:00
07:00-08:30 1-1/2 hr
08:30
08:30-12:30 4 hr
12:30
12:30-14:00 1-1/2 hr
12:30-14:00 1-1/2 hr
14:00
14:00-02:00 12 hr
14:00-18:00 4 hr
18:00
18:00-19:00 1 hr
19:00
19:00-21:00 2 hr
21:00
21:00-21:30 1/2 hr
21:30
21:30-22:00 1/2 hr
22:00
22:00-02:00 4 hr
02:00
02:00-04:00 2 hr
02:00-04:00 2 hr
04:00
04:00-06:00 2 hr
04:00-06:00 2 hr
04:00-06:00 2 hr
Progress Report
06:00-00:00 18 hr
06:00-17:00 11 hr
Well S-24A Page
Rig Nabors 9ES Date
9
08 September 99
Activity side.
Observed 30.00 klb resistance
Drilled to 3838.0 ft
Drilling ahead at report time. ART=2.0 hrs
AST=l.0hrs
BHA run no. 6 (cont...)
Drilled to 3960.0 ft
Drilled ahead to 3960'. Hit top Ugnu sand,
blinding off shakers. Reduce circ rate, gas cut
mud.
Stopped · To circulate
Circulated at 3960.0 ft
Circ at reduced rate, sand blinding off shakers.
Gradually bring pumps back to 600 gpm, circ to clean
hole. Gas cut mud and oil in sand.
Obtained clean returns - 130.00 % hole volume
Drilled to 4304.0 ft
Control drill ahead. Max penetration rate 150 fpm.
Liner failed - Abort operation
Repair
Repaired Liner
Change out swab and liner.
Equipment work completed
BHA run no. 6
Drilled to 4675.0 ft
ART=2.25 hrs AST=0.5 hrs
Started scheduled wiper trip: due to Footage drilled
Circulated at 4675.0 ft
Pump hi-visc sweep.
Obtained clean returns - 110.00 % hole volume
Pulled out of hole to 2610.0 ft
Some minor swabbing, tight at 3209'.
At 13-3/8in casing shoe
Serviced Top drive
Equipment work completed
R.I.H. to 4675.0 ft
No problems RIH.
On bottom
Drilled to 5010.0 ft
ART=3.25 AST=0
Mud pumps failed - Circulate
Repair
Repaired Mud pump power end
Inspect drive chain and sprocket, excessive noise.
Equipment work completed
BHA run no. 6
Drilled to 5200.0 ft
Drill ahead rotating and sliding as required for
directional control.
Drilled to 5200.0 ft
AST=0.75 hrs ART=6.25 hrs Drilled to top Seabee
shale interval. 33.5 hrs on bit.
BHA run no. 6 (cont...)
Drilled to 5982.0 ft (cont...)
AST=0.75 hrs ART=6.25 hrs Drilled to top Seabee
shale:
111 I.[.,l V~[l. Jd.J Ult.
Facility
Date/Time
17 Aug 99
18 Aug 99
i
PBS Pad
17:00
17:00-18:30
18:30
18:30-20:30
20:30
20:30-00:00
00:00
00:00-05:00
00:00-00:30
00:30
00:30-04:30
04:30
04:30-05:00
05:00
05:00-06:00
05:00-06:00
06:00
06:00-06:00
06:00-08:30
08:30
08:30-09:30
09:30
09:30-11:00
11:00
11:00-12:00
12:00
12:00-13:00
13:00
13:00-06:00
06:00-06:00
06:00-01:00
-- r
Progress Report
Well S-24A Page 10
Rig Nabors 9ES Date 08 September 99
Duration
Activity
1-1/2 hr
2 hr
3-1/2 hr
5 hr
1/2 hr
4 hr
1/2 hr
1 hr
1 hr
24 hr
2-1/2 hr
1 hr
1-1/2 hr
1 hr
1 hr
17hr
Reached planned end of run - Maximum hours on bit
Circulated at 5982.0 ft
Circ sweep.
Hole swept with slug - 150.00 % hole volume
Pulled out of hole to 942.0 ft
At BHA
Pulled BHA
Stand back HWDP. L/D BHA. Clear floor.
BHA Stood back
Test well control equipment
Retrieved Wear bushing
Equipment work completed
Tested BOP stack
R/U and tested annular to 250/3500 psi. Tested
pipe rams, blind rams, choke and kill line valves,
choke, and floor safety valves to 250/4000 psi.
Performed accumulator test. Witness of test waived by
L. Grimaldi, AOGCC.
Pressure test completed successfully - 4000.000 psi
Installed Wear bushing
Eqpt. work completed, running tool retrieved
Planned maintenance
Serviced Top drive
Service top drive. Break connections on top drive
subs.
Equipment work completed
BHA run no. 7
Made up BHA no. 7
BHA no. 7 made up
Flow check
Began precautionary measures
Flow test MWD @ 550 gpm = 1350 psi. RIH to 2918.
Fill DP.
Serviced Block line
Line slipped and cut
Slip 40', cut 80' of drlg line. Inspect brake
system.
R.I.H. to 5794.0 ft
On bottom
Functioned downhole tools at 5794.0 fl
Began precautionary measures
Check shot @ 5794. Ream last std. to bottom.
Establish ECD baselines. Cycle Andergage: Full gauge
= 3000 psi @ 580 gpm, undergauge = 2885 psi @ 580
gpm.
Drilled to 7473.0 ft
AST=l.83 hrs, ART= 8.57 hrs,
Up wt. = 185, dn = 130, Rot = 155 klb.
Torq on = 9/10, off = 6/8 kft-lbs.
24 hr
19hr
No Drag. No Losses. Mud weight raised to 10.6 ppg.
BHA run no. 7 (cont...)
Drilled to 8220.0 ft
Facility PBS Pad
Date/Time
19 Aug 99 01:00
01:00-03:00
03:00
03:00-06:00
03:00-06:00
06:00-23:00
06:00-08:30
08:30
08:30-09:00
09:00
09:00-09:30
09:30
09:30-13:00
13:00
13:00-16:30
16:30
16:30-20:30
20:30
20:30-22:30
22:30
22:30-23:00
23:00
23:00-06:00
23:00-23:30
Progress Report
Well S-24A Page 11
Rig Nab@rs 9ES Date 08 September 99
Duration
2 hr
3 hr
3 hr
Activity probably due to BHA geometry and low flow rate.
Reached planned end of run - Geological
Circulated at 8220.0 ft
Obtained bottoms up (100% annulus volume)
Sweep hole clean. Flowcheck well.
Pulled out of hole to 5803.0 ft
POOH wet. Worked tight spots and back ream from
6370 to 5803'. Clean floor
Pulled out of hole to 5803.0 ft
POOH- Tight @ 6,370, 6,200 and 5,982'. Currently
pulling thru West Sak w/25 klbs o/pull @ 5,803'.
Wash thru spots @ 5,982' & 5,820'.
17 hr
2-1/2 hr
Top Kuparuk = 7,804', Bottom @ 8,008'.
BHA run no. 7 (cont...)
Pulled out of hole to 5803.0 ft (cont...)
POOH- Tight @ 6,370, 6,200 and 5,982'. Currently
pulling thru West Sak w/25 klbs o/pull @ 5,803'
Wash thru spots @ 5,982' & 5,820'.
1/2 hr
1/2 hr
3-1/2 hr
3-1/2 hr
4 hr
2 hr
1/2 hr
7 hr
1/2 hr
Top Kuparuk = 7,804', Bottom @ 8,008'.
Stopped: To service drilling equipment
Stopped to slip drlg. line.
Serviced Block line
Slip 40' of drlg line.
Equipment work completed
Serviced Top drive
Equipment work completed
R.I.H. to 8220.0 ft
Fill D.P., ream last stand to bottom. <No
problems>
On bottom
Circulated at 8220.0 ft
Circulate and condition mud. Pump 2 sweeps, clean
hole for logging operations.
Obtained clean returns - 200.00 % hole volume
Pulled out of hole to 938.0 ft
POOH. Tight spots and slight swabbing from 7959'
to 7550' (top HRZ). POOH to shoe. <No problems>
Monitor well at shoe, POOH to BHA. No losses, no
gains.
At BHA
Pulled out of hole to 0.0 fl
Stood back BHA, down load MWD on floor before
standing back. Std back remainder of BHA.
At Surface: 0.0 ft
Stabilizer and bit balled up.
Removed Drillstring handling equipment
Clean and clear floor to prepare for logging
operations.
Equipment work completed
Electric wireline work
Held safety meeting
PJSM - r/u Schlumberger wireline, radioactive
source.
Facility PBS Pad
Progress Report
Well S-24A Page 12
Rig Nabors 9ES Date 08 September 99
Date/Time
23:30
23:30-01:00
20 Aug 99 01:00
01:00-05:00
Duration
1-1/2 hr
4 hr
Activity
Completed operations
Rigged up sub-surface equipment - Cable
RFU schlumberger wireline.
Equipment work completed
Conducted electric cable operations
RIH w/wireline log #1: LEH-QY/DTC-H/HILTB-FTB/D
05:00
05:00-06:00
06:00-09:00
06:00-09:00
09:00
09:00-02:30
09:00-10:00
10:00
10:00-11:00
11:00
11:00-12:00
12:00
12:00-13:00
13:00
13:00-15:30
15:30
15:30-17:00
17:00
17:00-18:30
18:30
18:30-21:30
21:30
1 hr
3 hr
3 hr
17-1/2 hr
1 hr
1 hr
1 hr
1 hr
2-1/2 hr
1-1/2 hr
1-1/2 hr
3 hr
T-270/GPIT-A/B/AH-SFT-270/DSST-B/AIT-I-UBNS-NG= 116.6'
Unable to work past 7350'. poh and
lay down DTA-A/AH-SET-270/GPit-A/B/AH-SFT-270/DSST-B.
Completed misrun with Formation logs to 7350.0 ft
Conducted electric cable operations
RIH w/wireline logs at report time.
Electric wireline work (cont...)
R.I.H. to 7124.0 ft
Observed 0.00 klb resistance
Unable to work past 7124'. POOH, 1/d logs, r/d
Schlumberger.
BHA run no. 8
Rigged up Drillstring handling equipment
Change out equipment and prep BHA for clean out
run.
Equipment work completed
Made up BHA no. 8
BHA no. 8 made up
R.I.H. to 2669.0 ft
At 13-3/8in casing shoe
Circulated at 2669.0 ft
Began precautionary measures
Stage up pumps to 400 gpm, 1700 psi. Circulate and
condition mud.
R.I.H. to 5500.0 ft
No problems
Began precautionary measures
Stage up pumps to 400 gpm and 1700 psi. Circulate
and condition mud.
R.I.H. to 7100.0 ft
Began precautionary measures
Reamed to 8220.0 ft
Precuationary ream to bottom @ 80 RPM, 450 GPM/
2100 psi. Some restriction @ 7,510', 7,636' and
7,680'.
On bottom
Circulated at 8220.0 ft
Hole swept with slug - 100.00 % hole volume
..... e sand clay coirdng ,~v~ -'--' ....
Facility
Date/Time
21 Aug 99
PBS Pad
21:30-00:00
Progress Report
00:00
Well S-24A Page 13
Rig Nabors 9ES Date 08 September 99
00:00-01:00
01:00
01:00-02:30
02:30
02:30-06:00
02:30-03:00
03:00
03:00-03:30
03:30
03:30-04:45
04:45
04:45-06:00
06:00
06:00-06:00
06:00-10:00
10:00
10:00-12:00
12:00
12:00-12:15
12:15
12:15-13:30
13:30
13:30-16:30
16:30
16:30-04:00
22 Aug 99 04:00
04:00-06:00
06:00-12:30
Duration
2-1/2 hr
1 hr
1-1/2 hr
3-1/2 hr
1/2 hr
1/2 hr
1-1/4 hr
1-1/4 hr
24 hr
4 hr
2 hr
1/4 hr
1-1/4 hr
3 hr
11-1/2 hr
2 hr
6-1/2 hr
Activity returns. Monitor well. Pump dry job. Stage up
Pulled out of hole to 2669.0 ft
POOH, slight swabbing in Kuparuk, pulls @ 30
klbs.Lubricate through Kuparuk, HRZ fine.
At 13-3/8in casing shoe
Monitor well.
Pulled out of hole to 861.0 ft
At BHA
Pulled BHA
BHA Stood back
Stabilisers balled up with clay.
Electric wireline work
Held safety meeting
PJSM -- r/u Schlumberger.
Completed operations
Rigged up Logging/braided cable equipment
R/U Schlumberger.
Equipment work completed
R.I.H. to 7200.0 ft
Observed 0.00 klb resistance
Made several unsuccessful attempts to get logs past
7200'. Aborted operation.
Pulled out of hole to 0.0 ft
POOH w/wireline logs.
At Surface: 0.0 ft
Electric wireline work (cont...)
Rigged up Logging/braided cable equipment
M/U DP conveyed RFT tools on ground. Rewire head
and p/u tools. Test wet connect for DP conveyed
logs. Hang sheave at derrick board.
Equipment work completed
Conducted electric cable operations
RIH w/RFT on DP.
Began precautionary measures
Crew change.
Held safety meeting
PJSM -- cut & slip drlg line.
Completed operations
Serviced Block line
Cut and slip drlg line. Adjust brakes. Service
top drive.
Equipment work completed
R.I.H. to 6500.0 ft
Began precautionary measures
Rigged up sub-surface equipment - Other sub-surface equipment
r/u side entry sub. RIH w/wireline, latch up
same. Ran into tight spot from 7250' to 7375'
(pushed 1200 lbs).
Work as directed by wireline personnel. Got all
required pressures. Got 1 of 2 required samples.
The one gallon sample vessel did not func.
Equipment work completed
Pulled out of hole to 6500.0 ft
Remove wet connect and pull wireline.
Electric wireline work (cont...)
Facility
Date/Time
23 Aug 99
PBS Pad
06:00-07:00
07:00
07:00-10:00
10:00
10:00-12:30
12:30
12:30-06:00
12:30-16:30
16:30
16:30-19:30
19:30
19:30-20:30
20:30
20:30-21:30
21:30
21:30-22:30
22:30
22:30-06:00
06:00-06:00
06:00-09:30
09:30
09:30-11:00
11:00
11:00-14:00
14:00
14:00-14:30
Progress Report
Well S-24A Page 14
Rig Nabors 9ES Date 08 September 99
Duration
1 hr
3 hr
2-1/2 hr
17-1/2 hr
4 hr
3 hr
1 hr
1 hr
1 hr
7-1/2 hr
24 hr
3-1/2 hr
1-1/2 hr
3 hr
1/2 hr
Activity
Pulled out of hole to 6500.0 fl
At Top of reservoir' 6500.0 ft
Pull wire and rig down same.
Flow check
Began precautionary measures
Check for flow, pump pill and POOH.
Rigged down sub-surface equipment - Toolstring
L/D Schlumberger tools and rig down sheave from
derrick. Lay down steel DC's.
Equipment work completed
BHA run no. 9
R.I.H. to 2669.0 ft
RIH w/BHA ~O. Shallow test MWD at 540 gpm. P/U
pipe from shed, rabbit off skate.
At 13-3/8in casing shoe
Circulate mud to break gels.
R.I.H. to 8020.0 ft
RIH out of derrick to 5500'. Circulate and
condition mud. RIH to 5783', check shot, RIH.
Began precautionary measures
Reamed to 8220.0 ft
Ream last 200' to bottom. Log last 30' @ 150'/hr.
Completed precautionary measures
Logging AFE 3A0050 ended at 20:30 on August 22,
began at 01:00 August 19.
Incremental service ticket costs over & above
rig/support services are:
LWD Resistivity = $18,485
Schlumberger Wireline = $142,805
Drilled to 8301.0 ft
Liner failed - Work string
Serviced Liner
Service #1 pump swab and liner.
Equipment work completed
Drilled to 8804.0 ft
Drill ahead to 8804'. No drag, no losses, ECD
steady.
BHA run no. 9 (cont...)
Drilled to 8955.0 ft
Control drill from 8804' to 8955'.
Began precautionary measures
Circulated at 8955.0 ft
Circulate sweep surface to surface. Cuttings
returned with slug.
Check for flow.
Hole displaced with Water based mud - 100.00 % displaced
Backreamed to 7500.0 ft
Short trip to 7500. Shales OK.. Tight from
8166-8055, wipe. Pull tight through Kuparuk
sands, backream and circulate from
8080' to 7600.
At top of check trip interval
R.I.H. to 8955.0 ft
No problems. Ream last 180' to bottom, staging
Facility
Date/Time
24 Aug 99
25 Aug 99
PBS Pad
14:30
14:30-06:00
06:00-06:00
06:00-06:00
06:00-09:00
09:00
09:00-10:00
10:00
10:00-19:00
19:00
19:00-21:00
21:00
21:00-00:30
00:30
00:30-04:30
04:30
04:30-06:00
06:00-18:30
06:00-09:00
09:00
Progress Report
Well S-24A
Rig Nabors 9ES
Page 15
Date 08 September 99
Duration
Activity
15-1/2 hr
On bottom
Drilled to 9665.0 ft
No losses. ECD steady. BHA dropping @ 1.2
degree/100'. Vary parameters in attempt to nose up
BHA. Now
24 hr
24 hr
BHA run no. 9 (cont...)
Drilled to 9665.0 ft (cont...)
No losses. ECD steady. BHA dropping @ 1.2
degree/100'. Vary parameters in attempt to nose up
BHA. Now
3 hr
1 hr
9 hr
2 hr
3-1/2 hr
4 hr
1-1/2 hr
12-1/2 hr
3 hr
Drilled to 9795.0 ft
Began precautionary measures
Drill ahead 9.7/8" hole. Sliding difficult-
attempting to maintain angle.
Circulated at 9795.0 ft
Obtained bottoms up (100% annulus volume)
Last stand rotated down- circulate to get sweep to
surface with pipe rotation prior to conducting 50
ft slide.
Drilled to 10180.0 fl
Reached planned end of run - Section / well T.D.
Drill ahead 9.7/8" hole. No losses, no drag- ECD
steady. BHA dropping 1.2 deg/100 in Rotary. Good
correlation with offsets for Sag River pick- observed
negative drilling break.
Circulated at 10180.0 ft
Obtained required geologic samples
Sweep hole clean- Siltstone observed in bottoms up.
Pulled out of hole to 10180.0 ft
At top of check trip interval
Flowcheck. POOH. Kingak pulling 20-30 klbs over,
Mileuvich "tugging". Work thru tight spot 9,000-8850
ft. Other formations in good shape. Pull back to
5,410 ft.
R.I.H. to 10180.0 ft
On bottom
RIH taking Rotating Torque/weight every 10 stands.
Wash/ream down last three stands gradually staging
up pumps. Observe resistance @ 9700-9800' & 9,360
ft.. Work/wipe thru same.
Circulated at 10180.0 ft
No fill on bottom. Circulate and condition mud with
120 RPM/545 GPM.
BHA run no. 9 (cont...)
Circulated at 10180.0 ft
Hole displaced with Water based mud - 50.00 % displaced
Some fragmented splinters on bottoms up. Constant
background- 2" wide on one shaker. Improved.
Displace well bore with 300 bbl clean casing pill
@ target
properties and 10.7 ppg mudweight.
Facility
Date/Time
PBS Pad
09:00-14:00
14:00
Duration
5 hr
14:00-15:00 1 hr
15:00
15:00-17:00 2 hr
17:00
17:00-18:30 1-1/2 hr
18:30
18:30-20:30 2 hr
18:30-20:30 2 hr
20:30
20:30-06:00 9-1/2 hr
20:30-23:00 2-1/2 hr
23:00
23:00-04:30 5-1/2 hr
26 Aug 99 04:30
I
r ·
Progress Report
04:30-06:00 1-1/2 hr
Well S-24A Page 16
Rig Nabors 9ES Date 08 September 99
06:00-15:30 9-1/2 hr
06:00-12:30 6-1/2 hr
12:30
12:30-13:00 1/2 hr
13:00
13:00-15:00 2 hr
15:00
15:00-15:30 1/2 hr
15:30
15:30-22:00 6-1/2 hr
15:30-19:00 3-1/2 hr
19:00
Activity
Pulled out of hole to 2669.0 ft
At 13-3/8in casing shoe
POOH. Kingak 20-30 klbs o/pull. Hole in good shape.
Serviced Block line
Line slipped and cut
Pulled out of hole to 1000.0 ft
At BHA
Pulled BHA
B HA Laid out
Laid out BHA. Top stabiliser balled in water
courses. Bit balled on one water course plugging one jet.
Bit in excellent condition.
BOP/riser operations - BOP stack
Installed Top ram
Equipment work completed
Pull wear bushing. Change top rams to 7" and test
same to 3500 psi. Pull test plug.
Run Casing, 7in O.D.
Rigged up Casing handling equipment
Work completed - Casing handling equipment in position
Clear rigfloor. R/U casing handling equipment and
Fill up tool. Hold PJSM.
Ran Casing to 2669.0 ft (7in OD)
At 7in casing shoe
Check Floats. Bakerlock shoetrack. Run 7", 26 lb/ft
casing to 13.3/8" shoe @ 2669 ft.
Circulated at 2669.0 ft
Circulate casing contents - 5 BPM/205 psi.
Run Casing, 7in O.D. (cont...)
Ran Casing to 7684.0 ft (7in OD)
Observed 10.00 klb resistance
RIH. Up and down drags following consistent trend.
At 7,684 ft unable to pull up- overpull= 350 Klbs.
In HRZ formation.
Circulated at 7684.0 ft
Broke circulation
Circulate @ 2 BPM/300 psi- OK. Able to breakover
pull @ 335-350 KLbs. Decision made to RIH without
attempting any further pick up weights.
Ran Casing to 10180.0 ft (7in OD)
On bottom
RIH. Tag bottom circulating last 20 ft. Final
slack-offweight @ 155 klbs. 251 joints ofT', 26
lb/ft casing run.
Rigged down Casing handling equipment
Equipment work completed
R/D Franks Fill up tool. Packer element damaged but
intact. R/U Dowell cement head.
Cement: Casing cement
Circulated at 10180.0 ft
Obtained clean returns - 120.00 % hole volume
Stage up pumps very slowly from 1 BPM to 6.6 BPM
over a two hour period. Final circulating pressure @
6.6 BPM/500 psi. Circulating 130% string contnets,
Facility PBS Pad
Date/Time
19:00-19:15
19:15
19:15-20:15
20:15
20:15-21:30
21:30
21:30-22:00
22:00
22:00-00:30
22:00-00:30
27 Aug 99 00:30
00:30-06:00
00:30-06:00
06:00
06:00-06:15
06:00-06:15
06:15
06:15-10:00
06:15-10:00
10:00
10:00-12:00
10:00-10:30
10:30
10:30-12:00
12:00
12:00-03:30
12:00-13:00
13:00
13:00-17:00
Progress Report
Well S-24A Page 17
Rig Nabors 9ES Date 08 September 99
Duration
Activity
1/4 hr
1 hr
1-1/4 hr
1/2 hr
2-1/2 hr
2-1/2 hr
5-1/2 hr
5-1/2 hr
1/4 hr
1/4 hr
3-3/4 hr
3-3/4 hr
2 hr
1/2 hr
1-1/2 hr
15-1/2 hr
1 hr
4 hr
Pumped Water based mud spacers - volume 30.000 bbl
Required volume of spacer pumped
Pump 5 bbl 11.0 ppg spacer. Test lines. Pump
remainder of spacer.
Mixed and pumped slurry - 250.000 bbl
Cement pumped
Mix and pump 195 bbls Lead Slurry @ 11.5 ppg ( 393
sx). Drop Bottom PLug. Mix and pump 55 bbls Tail
slurry @ 15.8 ppg ( 267 sx). Drop Top Plug.
Displaced slurry - 383.000 bbl
Plug bumped
Displace slurry @ 6.6 BPM/170 psi. Final pressure
prior to bump @ 2.7 BPM= 720 psi. Efficiency of
pumps @ 97%. Pressure up to 3000 psi. Bleed off. Check
floats- OK. CIP @ 2130 hrs.Total volume lost = 10
bbls.
Flow check
Observed well static
Observe well 30 minutes while clearing rigfloor and
preparing cellar.
BOP/riser operations - BOP stack
Rigged up BOP stack
Equipment work completed
N/D BOP to set emergency slips.
Wellhead work
Installed Slip & seal assembly
Equipment work completed
With 220 klbs string tension- set emergency slips.
Evacuate 7" landing joint of fluid. Make rough cut.
L/D jt. Redress tubing spool. Make final cut.
Install Tubing Spool and prepare to test @ report time.
Wellhead work (cont...)
Tested Tubing head spool
Pressure test completed successfully - 4300.000 psi
Test Tubing Spool and pack-off to 4300 psi.
BOP/riser operations - BOP stack
Installed BOP stack
Equipment work completed
Nipple up B OP.
BHA run no. 10
Rigged down Casing handling equipment
Equipment work completed
Change out Long bails to short bails. Clear
rigfloor.
Made up BHA no. 10
BHA no. 10 made up
MFU Cleanout assembly and stand back in derrick.
BOP/riser operations - BOP stack
Installed Top ram
Equipment work completed
Change out top 7" rams back to 3.1/2" x 6"
Vadables.
Tested BOP stack
Facility PBS Pad
Date/Time
17:00
17:00-03:30
28 Aug 99 03:30
03:30-06:00
03:30-06:00
06:00-09:30
06:00-07:00
07:00
07:00-07:30
07:30
07:30-09:30
09:30
09:30-10:30
09:30-10:30
10:30
10:30-23:30
10:30-11:30
11:30
11:30-12:30
12:30
12:30-16:00
16:00
16:00-17:00
17:00
17:00-19:00
19:00
19:00-19:30
19:30
19:30-23:30
23:30
23:30-06:00
Progress Report
Well S-24A Page 18
Rig Nabors 9ES Date 08 September 99
Duration
10-1/2 hr
2-1/2 hr
2-1/2 hr
3-1/2 hr
1 hr
1/2 hr
2 hr
1 hr
1 hr
13 hr
1 hr
1 hr
3-1/2 hr
1 hr
2 hr
1/2 hr
4 hr
6-1/2 hr
Activity
Suspended pressure test on Annular preventor, observed leak
R/U test string and run test plug. Test BOPE to 250
psi/4000 psi. Unable to obtain satisfactory test
on Annular
Installed Annular preventor
Equipment work completed
Change out Annular element. Run Test string and
retest element to 250/3500 psi. Test Blinds to 4000
psi. R/D Test string, run wear ring.
BHA run no. 10
R.I.H. to 3400.0 ft
RIH picking up 100 joints of 3.1/2" drillpipe.
BHA run no. 10 (cont...)
Singled in drill pipe to 3540.0 ft
100 joints picked up
RIH picking up 3.1/2" drillpipe for 6.1/8" hole
section.
Circulated at 3540.0 ft
Broke circulation
Circulate string contents.
R.I.H. to 9691.0 ft
Stopped: To circulate
Fluid system
Freeze protect well - 100.000 bbl of Fresh water
Completed operations
Line up on 7" x 13.3/8" annulus. Pump 100 bbls of
Fresh water @ 5 BPM/450 psi ( staging up rate).
Line up to HB & R.
BHA run no. 10
Washed to 10100.0 ft
At Top of cement: 10100.0 ft
Wash down @ 5 BPM/1700 psi and tag Float Collar 3
ft deep.
While washing down HB & R freeze protect outer
annulus with 210 bbls diesel @ 3 BPM/1450 psi.
Tested Casing - Via annulus and string
Pressure test completed successfully - 4000.000 psi
Line up and test 7" casing to 4000 psi/30 minutes.
( 4.2 bbls pumped/returned).
Drilled cement to 10187.0 ft
Stopped: To circulate
Drill hard cement @ 30-40 fph, 8 Klbs WOB.
Circulated at 10187.0 ft
Obtained bottoms up (100% annulus volume)
Circulated at 10187.0 ft
Hole displaced with Water based mud - 100.00 % displaced
Displace well to 8.4 ppg Quikdrill mud while
reciprocating/rotating pipe. Off bottom tq @ 8,000 ft
lbs.
Flow check
Observed well static
Pulled out of hole to 0.0 ft
At Surface: 0.0 ft
BHA run no. 11
Facility PBS Pad
Date/Time
23:30-01:30
29 Aug 99 01:30
01:30-05:00
05:00
05:00-06:00
06:00
Duration
06:00-06:30
06:00-06:30
06:30
06:30-07:30
06:30-07:00
07:00
07:00-07:30
07:30
2 hr
07:30-06:00
07:30-16:00
16:00
3-1/2 hr
1 hr
1/2 hr
1/2 hr
1 hr
1/2 hr
1/2 hr
16:00-17:00
17:00
17:00-03:00
30 Aug 99 03:00
22-1/2 hr
8-1/2 hr
1 hr
Progress Report
Well S-24A Page
Rig Nabors 9ES Date
lOhr
Activity
03:00-04:00
04:00
04:00-04:30
04:30
1 hr
1/2 hr
04:30-06:00
06:00-09:30
06:00-08:00
08:00
08:00-09:30
09:30
1-1/2 hr
3-1/2 hr
2 hr
1-1/2 hr
19
08 September 99
11:00-15:30
15:30
15:30-06:00
09:30-11:00
11:00
09:30-06:00
4-1/2 hr
14-1/2 hr
1-1/2 hr
20-1/2 hr
BHA run no. 11 (cont...)
Drilled to 10207.0 ft
Stopped: To perform FIT
Perform integrity test
Circulated at 10207.0 ft
Obtained bottoms up (100% annulus volume)
Performed formation integrity test
Obtained required level of integrity - 9.8 ppg EMW
Perform FIT. Surface pressure @ 650 psi. EMW @ 9.8
ppg over 8.4 ppg mudweight.
BHA run no. 11
Drilled to 10341.0 ft
Stopped: To correlate depth
Slide drill ahead 6.1/8" hole building angle. Stop
to evaulate options given latest tops.
Circulated at 10341.0 ft
Obtained required geologic samples
Stop and circulate well while evulating options
given latest formation tops.
Drilled to 10525.0 ft
Reached planned end of run - Directional objective met
Slide drill 6.1/8" hole building and turning. No
Drag, no losses.
Circulated at 10525.0 ft
Obtained bottoms up (100% annulus volume)
Pulled out of hole to 10180.0 ft
At 7in casing shoe
Flowcheck. POOH to 7" casing shoe. Pump dry job.
Pulled out of hole to 6000.0 ft
BHA run no. 11 (cont...)
Pulled out of hole to 1000.0 ft
At BHA
Pulled BHA
BHA Laid out
L/D BHA. Bit graded 4/5/I. Outer cutters broken or
chipped.
BHA run no. 12
Made up BHA no. 12
BHA no. 12 made up
Orientate and test tools, 250 GPM/980 psi.
R.I.H. to 10525.0 ft
On bottom
Drilled to 11031.0 ft
Drilled from 11,031' to 11,067'. Attempted to
slide from 11,061' to 11,067', unable to slide.
Decide to short trip.
Made up BHA no. 11
BHA no. 11 made up
Make up Kickoff assembly w/2 degree BH. Surface
test- OK.
R.I.H. to 10154.0 ft
Stopped: To service drilling equipment
Serviced Block line
Line slipped
Facility
Date/Time
31 Aug 99
01 Sep 99
02 Sep 99
03 Sep 99
Progress Report
PBS Pad
Well S-24A
Rig Nabors 9ES
Page 20
Date 08 September 99
15:30-06:00
Duration
14-1/2 hr
Activity
Drilled to 11031.0 ft
Directionally drill 6.1/8" hole. Slide first 70 ft.
Good sliding characteristics. 3% lubricants. No
drag, no losses.
06:00-06:00
06:00-08:00
24 hr
2 hr
ECD's tracking 9.6 ppg ( calculated 9.4 ppg).
Higher ECD' s because of long 7".
BHA run no. 12 (cont...)
Drilled to 11067.0 ft (cont...)
Directionally drill 6.1/8" hole. Slide first 70 ft.
Good sliding characteristics. 3% lubricants. No
drag, no losses.
08:00
08:00-09:00
09:00
09:00-09:30
09:30
09:30-10:30
10:30
10:30-11:30
11:30
11:30-12:00
12:00
12:00-06:00
06:00-06:00
06:00-06:00
06:00-06:00
06:00-21:30
21:30
21:30-23:30
23:30
23:30-00:00
00:00
00:00-00:30
1 hr
1/2 hr
1 hr
1 hr
1/2 hr
18hr
24 hr
24 hr
24 hr
15-1/2 hr
2 hr
1/2 hr
1/2 hr
ECD's tracking 9.6 ppg ( calculated 9.4 ppg).
Higher ECD's because of long 7".
- Stopped: To circulate
Circulate bottoms up prior to short trip.
Circulated at 11067.0 £t
Circulate bottoms up.
Obtained bottoms up (100% annulus volume)
Pulled out of hole to 10180.0 ft
At top of check trip interval
Serviced Block line
PJSM. Cut and slip drilling line.
Line slipped and cut
Serviced Top drive
Equipment work completed
R.I.H. to 11067.0 ft
RIH.
On bottom
Drilled to 11630.0 ft
Drilled and slide from 11,067' to 11,630'. AST= 5
hrs ART= 6 hrs Adding lubricant as required for
sliding. Starting angle build to 94.5 deg.
BHA run no. 12 (cont...)
Drilled to 12307.0 ft
Drill f/11,630' - 12,307', sliding as required for
angle and direction. Some difficulty sliding with
PDC, pumping lubricant and glass beads to assist.
Need to slide left to stay in polygon.
BHA run no. 12 (cont...)
Drilled to 12700.0 ft
Drill ahead. Attempted to slide. Slide was
unsuccessful. Decided to rotary drill. TD hole
section.
Reached planned end of run - Section / well T.D.
Drilled to 12,700'. Saw decrease in ROP.
Circulated at 12700.0 ft
Circulate sweep for short trip.
Obtained clean returns - 200.00 % hole volume
Pulled out of hole to 12700.0 ft
Short trip to 7" casing shoe
At 7in casing shoe
Serviced Top drive
Facility
Date/Time
04 Sep 99
Progress Report
PBS Pad
Well S-24A Page 21
Rig Nabors 9ES Date 08 September 99
00:30
00:30-03:00
03:00
03:00-06:00
03:00-06:00
06:00-13:00
06:00-06:30
06:30
06:30-11:30
11:30
11:30-13:00
13:00
13:00-01:30
13:00-13:30
13:30
13:30-14:00
14:00
14:00-17:00
17:00
17:00-21:00
21:00
21:00-21:30
21:30
21:30-22:00
22:00
22:00-00:00
00:00
00:00-01:30
01:30
01:30-04:00
01:30-02:30
Duration
2-1/2 hr
3 hr
3 hr
7 hr
1/2 hr
5 hr
1-1/2 hr
12-1/2 hr
1/2 hr
1/2 hr
3 hr
4 hr
1/2 hr
1/2 hr
2 hr
1-1/2 hr
2-1/2 hr
1 hr
Activity
Equipment work completed
R.I.H. to 12700.0 ft
RIH to 12,700'. Hole in good shape. No fill.
On bottom
Circulated at 12700.0 ft
Circulate hole clean while reciprocating pipe.
Spot liner running pill.
Circulated at 12700.0 ft
Circulate hole clean. Pump high viscosity sweep.
Spot liner pill. Check for flow - ok.
BHA run no. 12 (cont...)
Circulated at 12700.0 ft (cont...)
Circulate hole clean. Pump high viscosity sweep.
Spot liner pill. Check for flow - ok.
Hi-Vis mud spotted downhole
Pulled out of hole to 217.0 ft
POOH. Check for flow at 7" shoe - ok. Pump pill.
Drop 2 3/8" rabbit. Finish pulling out of hole.
At BHA
Pulled BHA
LD BHA. Clear floor of tools.
BHA Laid out
Stood back DP. L/D directional tools.
Run Liner, 4-1/2in O.D.
Rigged up Tubing handling equipment
RU to run liner.
Equipment work completed
Held safety meeting
Completed operations
Ran Liner to 2597.0 ft (4-1/2in OD)
Ran 4 1/2" liner.
Stopped: To change handling equipment
Ran Liner in stands to 10180.0 ft
RIH with liner, filling DP every 10 stands to 7"
shoe.
Stopped: To circulate
Rigged up Cement head
MU cement head. Set on pipe skate.
Equipment work completed
Circulated at 10180.0 ft
Broke circulation
Ran Liner in stands to 12687.0 ft
Finish running liner. Tag bottom at 12,700'.
On bottom
Circulated at 12700.0 ft
Held PJSM. Batch mix cement.
Obtained clean returns - 150.00 % hole volume
Cement: Liner cement
Mixed and pumped slurry - 77.000 bbl
Pump 5 bbl spacer. Tested lines to 4500 psi. Pump
35 spacer. Pumped 77 bbl G cmt at 15.8 ppg.
Washed lines. Displaced cmt w/45 bbl perf pill & 83.5
bbl mud. Bumped plug at calc'd strokes. CIP 0230
hrs, 9/4/99.
Facility
Date/Time
Progress Report
PBS Pad
Well S-24A Page 22
Rig Nabors 9ES Date 08 September 99
02:30
02:30-03:00
03:00
03:00-04:00
04:00
04:00-06:00
04:00-05:30
05:30
05:30-06:00
05:30-06:00
06:00-08:30
06:00-08:30
08:30
08:30-15:30
08:30-10:00
10:00
10:00-10:30
10:30
10:30-12:00
12:00
12:00-15:30
15:30
15:30-17:30
15:30-17:30
17:30
17:30-18:30
17:30-18:30
18:30
18:30-06:00
18:30-19:30
19:30
19:30-03:00
Duration
1/2 hr
1 hr
2 hr
1-1/2 hr
1/2 hr
1/2 hr
2-1/2 hr
2-1/2 hr
7 hr
1-1/2 hr
1/2 hr
1-1/2 hr
3-1/2 hr
2 hr
2 hr
1 hr
1 hr
11-1/2 hr
1 hr
7-1/2 hr
Activity
Cement pumped
Functioned Liner hanger
Pressure to 3500 psi. Set liner hanger. Bleed
pressure to 1000 psi. Rotate and unsting from hanger.
Circ while setting down 30K to set packer. PU and
circ.
Equipment work completed
Circulated at 10003.0 ft
Circ 20 bbl excess cement at 10 bpm. Reciprocate
pipe.
Obtained clean returns - 150.00 % hole volume
Fluid system
Fill pits with Seawater
Clean pits and seawater tanks.
Completed operations
Circulated at 10000.0 ft
Displace well to clean seawater.
Circulated at 10000.0 ft
Displace well bore to clean seawater.
Fluid system (cont...)
Circulated at 10000.0 ft (cont...)
Displace well bore to clean seawater.
Hole displaced with Seawater - 150.00 % displaced
Run Liner, 4-1/2in O.D.
Racked back Drillpipe
POH to 6,200'.
Stopped · To change handling equipment
Rigged down Cement head
Make service breaks and L/D cement head
Equipment work completed
Serviced Block line
Line slipped and cut
Laid down 3919.9 ft of Drillpipe
Hold PJSM. Check Crown-O-Matic. POH and L/D
3-1/2" DP and liner hanger tools.
Completed operations
Test well control equipment
Tested BOP stack
Pull wear ring and test BOP. Test Hydrill to
250/3500 psi. Tested pipe rams, blind rams, choke and
kill line valves to 250/4000 psi. Tested
accumulator, OK. (Choke and floor safety valves tested on
TOH). Witness waived by AOGCC Larry Wade.
Pressure test completed successfully - 4000.000 psi
Perform integrity test
Tested Casing
Closed blind rams and tested casing to 4000 psi, 30
min test. Installed wear ring.
Pressure test completed successfully - 4000.000 psi
Electric wireline work
Rigged up Logging/braided cable equipment
R/U Schlumberger.
Equipment work completed
Conducted electric cable operations
1')111 ...I [-~r)rlTM T ~: ..... _C_~ rI~t'-'~T ~- 1/~ t~f"tO' '~.T~-
(:lL J_~l UL
1%111 WI ~..-1~ 1. l_~U[il~lll[ tlJ7/ IIUllI IUD IUjUUJ ·
Progress Report
Facility PBS Pad
Well S-24A Page 23
Rig Nabors 9ES Date 08 September 99
Date/Time
05 Sep 99 03:00
03:00-06:00
03:00-06:00
06:00-13:30
06:00-07:30
07:30
07:30-13:30
13:30
13:30-06:00
13:30-22:00
22:00
22:00-23:00
23:00
23:00-00:00
06 Sep 99 00:00
00:00-00:30
00:30
00:30-01:15
01:15
01:15-03:30
03:30
03:30-06:00
03:30-06:00
06:00-15:00
Duration
3 hr
3 hr
7-1/2 hr
1-1/2 hr
6 hr
16-1/2 hr
8-1/2 hr
1 hr
1 hr
1/2 hr
3/4 hr
2-1/4 hr
2-1/2 hr
2-1/2 hr
9 hr
Activity showing significant cement bonding, continue to log
Completed run with GR from 10003.0 ft to 0.0 ft
Conducted electric cable operations
Eline run # 2. M/U USIT tool for CBL. Saw fair
to poor cmt with 20 % bonding. POH and L/D USIT
tool.
Conducted electric cable operations
P/U and RIH w/USIT tool for CBL. RIH to TOL and
logging up. Log showing approx 20% cement bond,
low strength cement. POH at report time.
Electric wireline work (cont...)
Conducted electric cable operations (cont...)
P/U and RIH w/USIT tool for CBL. RIH to TOL and
logging up. Log showing approx 20% cement bond,
low strength cement. POH at report time.
Completed logging run with Cement bond log from 10000.0 ft to 710
Conducted electric cable operations
Eline run #3. M/U CBT tool and RIH to 10,260'.
Tool showing good to fair cmt btwn 4-1/2" liner and
OH, and in liner lap. Some formation signals
showing up at 7" shoe. Press pass in 7" same result as
USIT. Bleed off press, POH & RD.
Completed logging run with Cement bond log from 10260.0 ft to 935
2-7/8in. Perforation assembly workstring run
Ran Tubing to 2720.0 ft (2-7/8in OD)
RU to run perf guns. PJSM. P/U perf guns, 77
jnts 2-7/8" fox tubing. RIH.
Stopped: To change handling equipment
Ran Drillpipe in stands to 12598.0 ft
P/U Halliburton pkr and perforating equipment, 4
stnds 3 1/2" DP, and 102 stnds 4" DP. RIH and tag
landing collar.
On bottom
Set packer at 9910.0 ft with 0.0 psi
PJSM. RU lines to circ and eco-meter to detect
shots. PT lines to 3,000 psi. Set packer.
Packer set at 9910.0 ft
Perforated
Perforated from 12,377' to 12,597' at 4 SPF. Closed
annular preventer. Press up annulus to 2600 psi.
Bleedback to 200 psi. Wait for time delay guns to
fire. Obtain bubbles in bubble bucket indicating
gunsfired. Pull up on DP to open bypass port.
Guns fired from 12377.0 ft to 12597.0 ft
Circulated at 9900.0 ft
Reverse circ 2 btms up. Minimal losses.
String displaced with Seawater - 200.00 % displaced
Circulated at 9943.0 ft
Circ through ports below pkr at 5 bpm.
Obtained clean returns - 150.00 % hole volume
Laid down 3410.0 ft of 4in OD drill pipe
POH laying down DP.
Laid down 3410.0 ft of 4in OD drill pipe
Finish L/D drill pipe to HOWCO equipment.
2-7/8in. Perforation assembly workstring run (cont...)
).0 ft
3.0 ft
Facility
Date/Time
PBS Pad
06:00-11:00
11:00
11:00-1 t:30
11:30
11:30-13:30
13:30
13:30-15:00
15:00
15:00-05:30
15:00-15:30
Duration
5 hr
1/2 hr
2 hr
1-1/2 hr
14-1/2 hr
1/2 hr
15:30
15:30-16:00
16:00
16:00-21:30
1/2 hr
5-1/2hr
21:30
21:30-22:30
1 hr
1/2 hr
22:30
22:30-23:00
23:00
23:00-02:00
07 Sep 99 02:00
02:00-02:30
3 hr
Progress Report
02:30
02:30-03:00
Well S-24A Page
Rig Nabors 9ES Date
03:00
03:00-04:00
04:00
04:00-05:00
05:00
05:00-05:30
05:30
05:30-06:00
05:30-06:00
06:00
06:00-08:00
1/2 hr
1/2 hr
1 hr
1 hr
1/2 hr
1/2 hr
1/2 hr
2 hr
24
08 September 99
Activity
Laid down 9909.0 ft of 4in OD drill pipe (cont...)
Finish L/D drill pipe to HOWCO equipment.
Stopped: To change handling equipment
Retrieved Retrievable packer
L/D Halliburton tools.
Completed operations
Laid down 2412.0 ft of Tubing
L/D 77 jts 2-7/8"Fox tubing.
77 joints laid out
Retrieved Gun assembly
L/D perf guns. All shots fired OK.
At Surface: 0.0 ft
Run Single completion, 4-1/2in O.D.
Rigged up Completion string handling equipment
Equipment work completed
Held safety meeting
Held PJSM.
Completed operations
Ran Tubing to 10007.0 ft (4-1/2in OD)
Ran 239 its 4.5", 12.6#, L-80 tubing + jewlery.
At Top of liner: 10003.0 ft
Tagged up inside liner @ 10,010.
Space out tubulars
Spaced out and landed tubing on hanger.
Completed operations
Installed Tubing hanger
RILDS.
Equipment work completed
Reverse circulated at 10007.0 ft
R/U and reverse circulate 160 bbls inhibited
seawater + 80 bbls diesel.
String displaced with Inhibited brine - 100.00 % displaced
Monitor wellbore pressures
Switch valves and allow diesel to U-tube.
Observed well static
Set packer at 9951.0 ft with 4000.0 psi
Dropped ball. Pressure tubing to 4000 psi to set
packer.
Packer set at 9951.0 ft
Tested Tubing
Pressure test tubing to 4000 psi for 30 min, OK.
Pressure test completed successfully - 4000.000 psi
Tested Permanent packer - Via annulus and string
Perform 30 rain annular test to 4000 psi, OK. Test
witnesses by L. Gramaldi AOGCC.
Pressure test completed successfully - 4000.000 psi
Laid down 24.0 ft of Drillpipe
L/D landing jr. R/D hoses.
Completed operations
Wellhead work
Installed Hanger plug
Installed TWC.
Eqpt. work completed, running tool retrieved
Nipple down BOP stack
Facility
Date/Time
Progress Report
PBS Pad
Well S-24A Page 25
Rig Nabors 9ES Date 08 September 99
06:00-08:00
08:00
08:00-06:00
08:00-10:30
10:30
10:30-11:00
11:00
11:00-11:30
11:30
Duration
2 hr
22 hr
2~ 1/2 hr
1/2 hr
1/2 hr
Activity
Removed BOP stack
Equipment work completed
Wellhead work
Installed Xmas tree
NFU adapter and tree. Tested tree and adapter to
5000 psi, ok.
Equipment work completed
Removed Hanger plug
Pulled TWC.
Equipment work completed
Installed Hanger plug
Installed BPV and secured well.
Eqpt. work completed, running tool retrieved
Rig released for move to W-26A at 1130 hrs 9/7/99.
10/6/99
GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATEN: Sherrie
NO. 12838
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
Well Job # Log Description Date Blueline Sepia CD
S-24A ~ d.~.~,..~,~ MEM JEWELRY & STATIC LOG 990924 I i
S-24A 99374 USlT 990904 I Color
S-24A 99373 CBL (PDC) 990904 1 ] 1
B-02A ~ ~'"5 ~ ~ 99323 RST 990804 I I 1
K-04A 99371 CBL/SCMT 990924 I Color
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
RECEIVED
t' ~,,~"i' '13 1999
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
iTeTcN :eill ,..~~?~~errie ~ ........
ANADRI LL
SCHLUMBERGER
Survey report
Client ................... : BP Exploration (Alaska) Inc.
Field .................... : Prudhoe Bay
Well ..................... : S-24Ai
API number ............... : 50-029-22044-01
Engineer ................. : N.Rose
Rig: ..................... : Nabors 9ES
~tate: ................... : Alaska
Survey calculation methods
Method for positions ..... : Minimum curvature
Method for DLS ........... : Mason & Taylor
Depth reference
Permanent datum .......... : Mean Sea Level
Depth reference .......... : Drill Floor
GL above permanent ....... : 35.43 ft
KB above permanent ....... : 63.77 ft
DF above permanent ....... : 63.77 ft
Vertical section origin
Latitude (+N/S-) ......... :
Departure (+E/W-) ........ :
0.00 ft
0.00 ft
Platform reference point--
atitude (+N/S-) ......... : -999.25 ft
Departure (+E/W-) ........ : -999,25 ft
Azimuth from rotary table to target: 307.40 degrees
2-Sep-1999 23:37:55
Page 1 of 15
Spud date ................ : 13-AUG-99
Last survey date ......... : 02-Sep-99
Total accepted surveys...: 418
MD of first survey ....... : 0.00 ft
MD of last survey ........ : 12699.00 ft
Geomagnetic data~
Magnetic model ........... : BGGM version 1999
Magnetic date ............ : Il-Aug-1999
Magnetic field strength..: 1146.73 HCNT
Magnetic dec (+E/W-) ..... : 27.20 degrees
Magnetic dip ............. : 80.70 degrees
MWD survey Reference Criteria
Reference G .............. : 1002.68 mGal
Reference H .............. : 1146.70 HCNT
Reference Dip ............ : 80.70 degrees
Tolerance of G ........... : (+/-) 2.50 mGal
Tolerance of H ........... : (+/-) 6.00 HCNT
Tolerance of Dip ......... : (+/-) 0.45 degrees
Corrections
Magnetic dec (+E/W-) ..... : 27.19 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-) .... : 27.19 degrees
(Total az corr = magnetic dec - grid conv)
Sag applied (Y/N) ........ : No degree: 0.00
[(c) 1999 Anadrill IDEAL ID6 0C 04]
-- --
ORIGINAL
ANADRILL SCHLUMBERGER Survey Report
Seq Measured Incl Azimuth Course
# depth angle angle length
- (ft) (deg) (deg) (ft)
1 0,00 0.00 0,00
2 5,88 0.42 116.35
3 14.38 0,42 110,28
4 23.78 0.30 94.68
5 33.38 0.17 74.68
2-Sep-1999 23:37:55
6 44,58 0,15 30,16
7 55.98 0,17 342,01
8 67,33 0.18 328.07
9 78.73 0,15 326,52
10 90.13 0,12 335,52
Page
11 101,53 0,10 347,61
12 112.93 0.08 348,69
13 124.43 0,08 324,81
14 135,88 0,07 288,77
15 147,38 0.08 259.82
TVD Vertical Displ Displ Total At
depth section +N/S- +E/W- displ Azim
(ft) (ft) (ft) (ft) (ft) (deg)
16 158.78 0.10 236.88
17 170.18 0,13 219.89
18 181,58 0,15 209,80
19 192,78 0.17 206,95
20 204,08 0,18 204.10
21 215,33 0,20 194,91
22 226,63 0,22 183,42
23 237,93 0,23 175.17
24 249,23 0,25 166.64
25 260,53 0,27 155,87
0,00 0.00 0,00 0,00 0,00 0,00
5,88 5.88 -0,02 -0.01 0,02 0.02
8,50 14,38 -0.08 -0.03 0.08 0,08
9.40 23.78 -0,14 -0.05 0,13 0,14
9.60 33.38 -0.16 -0.05 0.17 0.18
26 271.83 0.27 144,10
27 283,03 0,28 130,55
28 294.33 0,28 117,01
29 305,53 0,28 104,30
30 316,83 0.27 89,78
11,20
11,40
11,35
11,40
11.40
11,40
11.40
11,50
11.45
11..50
11.40
11.40
11,40
11,20
11,30
0,00
116,35
114,10
109.86
105.10
44,58 -0,17 -0,03 0,20 0,20 98,54
55.98 -0,16 -0,00 0.20 0.20 90,11
67,33 -0,13 0.03 0,18 0.19 80.46
78.73 -0,10 0,06 0,17 0,18 70,55
90.13 -0,07 0,08 0,15 0.17 61.77
0.15
0,14
0,14
0,12
0.11
0,09
0,08
0,06
0,05
0,03
0,18
0,19
0,19
0,19
0.18
0.17
0,14
0,12
0,08
0.05
11,25
11,30
11,30
11,30
11.30
101,53 -0.05 0,10
112,93 -0,04 0,12
124,43 -0,03 0,13
135.88 -0,01 0,14
147,38 0,00 0,14
158.78 0,01 0,14
170.18 0,01 0,12
181,58 0,01 0,10
192,78 0,01 0,07
204,08 -0.00 0.04
11.30
11,20
11,30
11,20
11,30
215.33 -0,01 0.01 0.02 0.02
226,63 -0,03 -0,04 0,01 0.04
237,93 -0,06 -0,08 0,01 0.08
249,23 -0,09 -0,13 0,02 0,13
260.53 -0.14 -0.17 0.04 0.18
271.83 -0.18 -0,22 0.06 0,23
283,03 -0.24 -0.26 0,10 0.28
294,33 -0,29 -0,29 0,15 0.32
305,53 -0,34 -0,31 0,20 0,37
316.83 -0,39 -0,32 0.25 0,40
54,82
49,73
45,21
40,93
37,26
34,25
32,22
31,68
32,92
37.96
75,20
160,45
170,56
170,62
167,90
163,83
158,90
153,33
147,56
141,66
2 of 15
DLS
(deg/
100f)
0,00
7,14
0.52
1.64
1.58
1.09
1,16
0.38
0.27
0.32
0,27
0,18
0,29
0.41
0,34
0,36
0,40
0,28
0,19
0,12
0,32
0,41
0,30
0,36
0,47
0,49
0.59
0,58
0,55
0,62
Srvy
tool
type
TIP
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
Tool
qual
type
.. [ (c)1999 Anadrill IDEAL ID6_0C_04]
ANADRILL SCHLUMBERGER Survey Report 2-Sep-1999 23:37:55 Page 3 of 15
Seq Measured Incl Azimuth Course
# depth angle angle length
- (ft) (deg) (deg) (ft)
31 328.03 0.23 76.95 11.20
32 339.28 0.22 68.01 11.25
33 350.58 0.17 59.42 11.30
34 361.88 0.12 49.69 11.30
35 373.18 0.05 27.29 11.30
36 384.48 0.03 290.86
37 395.78 0.12 206.77
38 407.08 0.17 199.57
39 418.33 0.22 191.68
40 429.58 0.23 184.15
TVD Vertical Displ Displ
depth section +N/S- +E/W-
(ft) (ft) (ft) (ft)
328.03 -0.43 -0.31 0.30
339.28 -0.45 -0.30 0.34
350.58 -0.47 -0.28 0.37
361.88 -0.48 -0.27 0.40
373.18 -0.48 -0.25 0.41
41 440.88 0.23 175.67
42 452.18 0.25 161.59
43 463.48 0.27 145.86
44 474.78 0.25 129.96
45 486.08 0.23 114.24
11.30 384.48 -0.48 -0.25 0.41
11.30 395.78 -0.47 -0.26 0.40
11.30 407.08 -0.48 -0.28 0.39
11.25 418.33 -0.50 -0.32 0.38
11.25 429.58 -0,52 -0.36 0.37
46 497.33 0.20 99.89
47 508.63 0.15 85.09
48 519.88 0.10 66.36
49 531.18 0.07 41.78
50 542.43 0.05 350.03
11.30
11.30
11.30
11.30
11.30
51 553.73 0.05 285.01
52 565.03 0.10 243.59
53 576.33 0.13 223.01
54 587.68 0.15 213.34
55 598.98 0.17 205.50
440.88
452.18
463.48
474.78
486.08
56 610.28 0.17 191.58
57 621.53 0.18 173.02
58 632.83 0.18 154.60
59 644.18 0.17 135.37
60 655.43 0.15 116.19
-0.55
-0.58
-0.63
-0.68
-0.72
-0,41 0.37
-0.46 0.38
-0.50 0.41
-0~.54.',i~ · ~0.44
-0.56 0.48
11.25 497.33 -0.76 -0.58 0.52
11.30 508.63 -0.79 -0.58 0.55
11.25 519.88 -0.81 -0.57 0.58
11.30 531.18 -0.81 -0.56 0.59
11.25 542.43 -0.81 -0.55 0.60
11.30 553.73 -0.80 -0.55 0.59
11.30 565.03 -0.79 -0.55 0.58
11.30 576.33 -0.79 -0.56 0.56
11,35 587.68 -0.79 -0.59 0.54
11.30 598.98 -0.79 -0.61 0.53
11.30 610.28 -0.80 -0.65 0.52
11.25 621.53 -0.82 -0.68 0.51
11.30 632.83 -0.85 -0.71 0.52
11.35 644.18 -0,88 -0.74 0.54
11.25 655.43 -0.91 -0.76 0.57
,
Total At DLS Srvy Tool
displ Azim (deg/ tool qual
(ft) (deg) 100f) type type
0.43 136.19 0.61 GYRO
0.45 131.19 0.32 GYRO
0.47 126.87 0.51 GYRO
0.48 123.63 0.49 GYRO
0.48 121.70 0.67 GYRO
0.48 121.17 0.54 GYRO
0.48 122.66 1.07 GYRO
0.48 126.00 0.47 GYRO
0.50 130.11 0.50 GYRO
0.52 134.21 0,28 GYRO
0.55 137.56 0,30 GYRO
0.60 139.87 0.55 GYRO
0.64 140.93 0.65 GYRO
0.70 140.73 0.66 GYRO
0.74 139.59 0.61 GYRO
0.78 137.95 0.55 GYRO
0.80 136.24 0.59 GYRO
0.81 134.78 0.57 GYRO
0.82 133.65 0.41 GYRO
0.81 132.96 0.49 GYRO
0.80 132.92 0.48 GYRO
0.80 133.75 0.63 GYRO
0.79 135.34 0.45 GYRO
0.80 137.31 0.27 GYRO
0.81 139.43 0,26 GYRO
0.83 141.41 0.36 GYRO
0.85 142.89 0.51 GYRO
0.89 143.70 0.51 GYRO
0.92 143.76 0.52 GYRO
0.95 143.20 0.51 GYRO
[(c)1999 Anadrill IDEAL ID6 0C 04]
ANADRILL SCHLUMBERGER Survey Report
Seq Measured Incl Azimuth
# depth angle angle
- (ft) (deg) (deg)
61 666.73 0.15 91.98
62 678.03 0.12 62.50
63 689.28 0.08 38.17
64 700.58 0.08 9.56
65 711.78 0.07 333.95
2-Sep-1999 23:37:55
66 722.98 0.07 298.27
67 734.23 0.05 255.33
68 745.48 0.08 222.57
69 756.73 0.10 200.54
70 768.03 0.12 176.75
Course TVD Vertical Displ Displ Total
length depth section +N/S- +E/W- displ
(ft) (ft) (ft) (ft) (ft) (ft)
11.30 666.73 -0.94 -0.77 0.60 0.97
11.30 678.03 -0.96 -0.76 0.62 0.98
11.25 689.28 -0.96 -0.75 0.64 0.98
11.30 700.58 -0.96 -0.74 0.64 0.98
11.20 711.78 -0.95 -0.72 0.64 0.97
71 779.33 0.13 157.09
72 790.58 0.15 138.58
73 801.83 0.17 120.10
74 813.13 0.18 102.52
75 824.43 0.17 85.26
11.20 722.98 -0.94 -0.71 0.63 0.95
11.25 734.23 -0.93 -0.71 0.62 0.94
11.25 745.48 -0.92 -0.72 0.61 0.94
11.25 756.73 -0.92 -0.73 0.60 0.95
11.30 768.03 -0.93 -0.75 0.60 0.96
779.33
790.58
801.83
813.13
824,43
11.30
11.25
11.25
11.30
11.30
76 835.73 0.15 69.91 11.30 835.73
77 846.98 0.15 55.37 11.25 846.98
78 858.28 0.12 34.21 11.30 858.28
79 869.58 0.10 15.55 11.30 869.58
80 880.88 0.07 2.09 11.30 880.88
81 892.18 0.02 330.32
82 903.38 0.02 266.23
83 914.58 0.05 186.32
84 925.88 0.10 137.70
85 937.08 0.13 126.13
892.18
903.38
914.58
925.88
937.08
11.30
11.20
11.20
11.30
11.20
86 948.28 0.15 116.31 11.20 948.28
87 959.58 0.17 98.94 11.30 959.58
88 970.83 0.18 78.21 11.25 970.83
89 982.13 0.17 59.94 11.30 982.13
90 993.43 0.13 41,64 11.30 993.43
-0.95
-0.98
-1.01
-1.04
-1.07
-1.09
-1.10
-1.11
-1.10
-1.10
-1.09
-1.09
-1.09
-1.10
-1.12
-1.15
-1,18
-1.21
-1.22.
-1.23
-0.78
, ,0.80
-0.82
-0.83
-0.83
0.61
0.62
0.64
0.68
0.71
-0.83
-0.81
-0.80
-0.78
-0.76
0.74
0.77
0.79
0.80
0.80
-0.75
-0.75
-0.76
-0.77
-0.78
0.80
0.79
0.79
0.80
0,81
-0.80
-0.81
-0.80
.~0,79
-0.77
0.84
0.87
0.90
0.93
0.96
Page
At
Azim
(deg)
__
142.13
140.79
139.67
138.86
138.40
0.99
1.01
1,04
1.07
1.10
1.11
1.12
1.12
1.11
1.10
1.10
1.09
1.09
1.11
1.13
1.16
1.18
1.21
1.22
1.23
138.43
138.84
139.58
140.57
141.49
142.09
142.22
141.83
140.89
139.60
138.18
136.73
135.39
134.35
133.64
133,34
133.38
133.66
133.90
133.84
133.54
132.87
131.74
130,33
129.00
4 of 15
DLS
(deg/
100f)
0.56
0.66
0.51
0.35
0.42
0.38
0.42
0.41
0.35
0.44
0.39
0.44
0.49
0.48
0.47
0.42
0.34
0.51
0.36
0.32
0.48
0.19
0.45
0.68
0.34
0.28
0.46
0.57
0.50
0.55
Srvy
tool
type
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
Tool
qual
type
[(c)1999 Anadrill IDEAL ID6_0C_04]
ANADRILL SCHLUMBERGER Survey Report
Seq
#
91
92
93
94
95
Measured Incl Azimuth
depth angle angle
(ft) (deg) (deg)
1004.63 0.12 23.01
1015.73 0.10 2.32
1026.83 0.08 345.03
1037.98 0.05 341.72
1049.13 0.02 44.27
2-Sep-1999 23:37:55
96 1060.28 0.07 107.26
97 1071.43 0.15 105.68
98 1082.58 0.22 98.64
99 1093.68 0.25 90.86
100 1104.78 0.27 84.15
Course TVD Vertical Displ Displ
length depth section +N/S- +E/W-
(ft) (ft) (ft) (ft) (ft)
11.20 1004.63 -1.23 -0.75 0.97
11.10 1015.73 -1.22 -0.73 0.97
11.10 1026.83 -1.21 -0.72 0.97
11.15 1037.98 -1.20 -0.70 0.97
11.15 1049.13 -1.19 -0.70 0.97
101 1115.88 0.28 75.15
102 1126.93 0.32 64.96
103 1138.03 0.32 58.19
104 1149.08 0.32 52.12
105 1160.23 0.30 48.97
11.15
11.15
11.15
11.10
11.10
106 1171.38 0.28 49.23
107 1182.53 0.27 51.36
108 1193.73 0.27 56.40
109 1204.88 0.27 64.14
110 1216.03 0.27 78.19
11.10
11.05
11.10
11.05
11.15
111 1227.18 0.32 92.31
112 1238.33 0.40 96.44
113 1249.48 0.47 94,76
114 1260.63 0.52 94.10
115 1271.78 0.55 93.08
11.15
11.15
11.20
11.15
11.15
116 1282.93 0.55 89.09
117 1294.08 0.55 85.33
118 1305.13 0.53 81.42
119 1316.23 0.53 77.11
120 1327.28 0.52 74.53
11.15
11.15
11.15
11.15
11.15
1060.28 -1.20 -0.70 0.98
1071.43 -1.22 -0.71 1.00
1082.58 -1.25 -0.71 1.03
1093.68 -1.29 -0.72 1.08
1104.78 -1.33 -0.71 1.13
1115.88 -1.37 -0.70 1.18
1126.93 -1.40 -0.68 1.23
1138.02 -1.42 -0.65 1.29
1149.07 -1.44 -0.62 1.34
1160.22 -1.45 -0.58 1.39
1171.37 -1.47 -0.54 1.43
1182.52 -1.48 -0.51 1.47
1193.72 -1.49 -0.48 1.51
1204.87 -1.51 -0.45 1.56
1216.02 -1.54 -0.44 1.61
1227.17 -1.58 -0.43 1.66
1238.32 -1.64 -0.44 1.73
1249.47 -1.72 -0.45 1.82
1260.62 -1.80 -0.45 1.91
1271,77 -1.88 -0.46 2.02
1282.92 -1.97 -0.46 2.13
1294.07 -2.05 -0.46 2.23
1305.12 -2.13 -0.44 2.34
1316.22 -2.19 -0.43 2.44
1327.27 -2.26 -0.40 2.53
11.15
11.15
11.05
11.10
11.05
Page 5 of 15
Total At DLS Srvy
displ Azim (deg/ tool
(ft) (deg) 100f) type
1.23 127,88 0.37 GYRO
1.22 126.98 0.40 GYRO
1.21 126.38 0.30 GYRO
1.20 126.01 0.27 GYRO
1.19 125.78 0.40 GYRO
1.20 125.59 0.57 GYRO
1.22 125.26 0.72 GYRO
1.25 124.59 0.66 GYRO
1.29 123.59 0.39 GYRO
1.34 122.31 0.33 GYRO
1.37 120.81 0.40 GYRO
1.41 118.99 0.60 GYRO
1.45 116.92 0.34 GYRO
1.48 114.81 0.31 GYRO
1.50 112.74 0.24 GYRO
1.53 110.85 0.18 GYRO
1.56 109.13 0.13 GYRO
1.59 107.57 0.21 GYRO
1.62 106.21 0.33 GYRO
1,67 105.18 0.59 GYRO
1.72 104.55 0.79 GYRO
1.79 104.16 0.75 GYRO
1.87 103.77 0.64 GYRO
1.97 103.32 0.45 GYRO
2.07 102.83 0.28 GYRO
2.18 102.26 0.34 GYRO
2.28 101.56 0.32 GYRO
2.38 100.78 0.38 GYRO
2.47 99.91 0.36 GYRO
2.57 98.98 0.23 GYRO
Tool
qual
type
[(c)1999 Anadrill IDEAL ID6 0C 04]
ANADRILL SCHLUMBERGER Survey Report 2-Sep-1999 23:37:55 Page 6 of 15
Seq Measured Incl Azimuth
# depth angle angle
- (ft) (deg) (deg)
121 1338.38 0.50 72.59
122 1349.48 0.50 70.52
123 1360.58 0.53 69.24
124 1371.78 0.58 68.70
125 1382.88 0.58 68.81
Course TVD Vertical Displ Displ
length depth section +N/S- +E/W-
(ft) (ft) (ft) (ft) (ft)
11.10 1338.37 -2.32 -0.37 2.63
11.10 1349.47 -2.37 -0.34 2.72
11.10 1360.57 -2.42 -0.31 2,81
11.20 1371.77 -2.48 -0.27 2.92
11.10 1382.87 -2.54 -0.23 3.02
126 1394.08 0.58 69.71
127 1405.18 0.58 71.53
128 1416.38 0.60 72.49
129 1427.53 0.62 71.80
130 1438.68 0.65 72.33
11.20
11.10
11.20
11.15
11.15
131 1449.88 0.70 74.59
132 1461.03 0.78 74.40
133 1472.18 0.82 72.64
134 1483.33 0.83 72.32
135 1494.53 0.82 71.74
11.20
11.15
11.15
11.15
11.20
136 1505.58 0.83 70.19
137 1516.63 0.83 66.24
138 1527.78 0.82 61.61
139 1538.88 0.77 57.74
140 1549.98 0.72 55.54
11.05
11.05
11.15
11.10
11.10
141 1561.13 0.68
142 1572.28 0.67
143 1583.48 0.65
144 1594.68 0.62
145 1605.78 0.62
1394.07 -2.60 -0.19 3.13
1405.17 -2.66 -0.15 3.23
1416.37 -2.73 -0,12 3.34
1427.52 -2.79 -0.08 3.46
1438.66 -2.86 -0.04 3.57
146 1616.98 0.62
147 1628.18 0.62
148 1639.33 0.63
149 1650.48 0.72
150 1661.68 0.80
1449.86 -2.94 -0.00 3.70
1461.01 -3.03 0.04 3.84
1472.16 -3.12 0.08 3.99
1483.31 -3.21 0.13 4.14
1494.51 -3.30 0.18 4.29
1505.56 -3.39 0.23 4.44
1516.61 -3.47 0.29 4.59
1527.76 -3.55 0,36 4.74
1538.85 -3.60 0.44 4.87
1549.95 -3.65 0.52 4.99
56.03 11.15 1561.10
58.33 11.15 1572.25
62.59 11.20 1583.45
66.70 11.20 1594.65
70.25 11.10 1605.75
73.93 11.20 1616.95
77.03 11.20 1628.15
80.61 11.15 1639.30
84.73 11.15 1650.45
85.57 11.20 1661.65
-3.69 0.59 5.10
-3.74 0.66 5.21
-3.79 0.73 5.33
-3.85 0.78 5.44
-3.91 0.82 5.55
-3.98 0.86 5.66
-4.05 0.89 5.78
-4.13 0.92 5.90
-4.23 0.93 6.03
-4.34 0.95 6.18
Total At DLS Srvy Tool
displ Azim (deg/ tool qual
(ft) (deg) 100f) type type
2.66 98.07 0.24
2.74 97.17 0.16
2.83 96.24 0.29
2.93 95.27 0.45
3.03 94.32 0.01
3.13 93.44 0.08
3.24 92.67 0.17
3.34 91.97 0.20
3.46 91.30 0.19
3.57 90.65 0.27
3.70 90.05 0.51
3.84 89.47 0.72
3.99 88.86 0.42
4.14 88.23 0.10
4.30 87.63 0.12
4.45 87.04 0.22
4.60 86.40 0.52
4.75 85.66 0.60
4.89 84.87 0.66
5.02 84.09 0.52
5.14 83.37 0.36
5.26 82.74 0.26
5.38 82.22 0.47
5.49 81.83 0.49
5.61 81.55 0.35
5.73 81.35 0.36
5.85 81.22 0.30
5.97 81.18 0.36
6.10 81.21 0.92
6.25 81.31 0.72
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
[(c)1999 Anadrill IDEAL ID6 0C 04]
-- --
ANADRILL SCHLUMBERGER Survey Report 2-Sep-1999 23: 37: 55 Page 7 of 15
Seq Measured Incl Azimuth
# depth angle angle
- (ft) (deg) (deg)
151 1672.88 0,83 85,13
152 1684,03 0,85 86.11
153 1695.18 0.87 86,20
154 1706.28 0.90 85.27
155 1717,38 0,92 84,18
Course TVD Vertical Displ Displ Total At DLS
length depth section +N/S- +E/W- displ Azim (deg/
(ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f)
11.20 1672,85 -4.45 0,96 6,34 6,41 81,41 0,27
11,15 1683.99 -4,58 0.97 6.50 6,57 81.51 0.22
11,15 1695.14 -4.70 0.98 6.67 6.74 81.63 0,18
11.10 1706,24 -4.83 0,99 6.84 6,91 81,73 0.30
11,10 1717,34 -4,96 1,01 7,01 7,09 81,80 0,24
156 1728.53 0,92 83,61
157 1739,63 0.88 84,69
158 1750,73 0.85 86.73
159 1761.93 0.85 89.09
160 1773,13 0,85 91,09
11,15
11.10
11.10
11,20
11.20
161 1784,33 0,83 92,59
162 1795,53 0.80 95.84
163 1806,53 0.80 98.54
164 1817.58 0,83 99,49
165 1828.63 0.82 102.37
11,20
11,20
11,00
11,05
11.05
166 1839,63 0,80 106.54
167 1850,68 0,82 108,94
168 1861.68 0,82 109.55
169 1872,73 0,80 111,14
170 1883,78 0,85 113,66
11.00
11,05
11,00
11,05
11,05
171 1894,78 0,93 114,68
172 1905.73 0,92 114,96
173 1916,68 0,88 115,54
174 1927,68 0.83 116,50
175 1938,63 0,83 116,08
11,00
10,95
10,95
11,00
10,95
176 1949.58 0.82 115.52
177 1960,58 0,75 115,89
178 1971,63 0,70 114.72
179 1982,68 0,68 113,23
180 1993,68 0.65 111,02
10,95
11,00
11.05
11,05
11,00
1728,49 -5,09 1,03 7,19 7,27
1739,59 -5.22 1.05 7.37 7.44
1750,69 -5,34 1.06 7,53 7,61
1761.89 -5,47 1.07 7.70 7,77
1773,08 -5,60 1,07 7,87 7,94
1784,28 -5,73 1,06 8.03 8.10
1795,48 -5,87 1.05 8,19 8,26
1806,48 -6.00 1.03 8.34 8,40
1817,53 -6,14 1.01 8,50 8,56
1828,58 -6.28 0.97 8.65 8.71
1839,58 -6,42 0,94 8,80 8,85
1850,63 -6,57 0.89 8,95 9,00
1861,63 -6,72 0,84 9.10 9.14
1872,67 -6.87 0,78 9.25 9.28
1883,72 -7,02 0.72 9.39 9.42
81,85
81.91
81,99
82.12
82.28
82,48
82,70
82.96
83,25
83.57
83,93
84.33
84,75
85,16
85.61
1894,72 -7,19 0,65 9,55 9,57 86,10
1905,67 -7,36 0,58 9,71 9,73 86.60
1916,62 -7,53 0,50 9,87 9,88 87,07
1927.62 -7,6.9 0,43 10,01 10,02 87,53
1938,57 -7.85 0.36 10.16 10.16 87.96
1949,52 -8.00 0.29 10,30 10.30 88.37
1960,51 -8,15 0,23 10,43 10,44 88,75
1971.56 -8,29 0,17 10,56 10,56 89,09
1982,61 -8.42 0.11 10,68 10,68 89,39
1993,61 -8,54 0,07 10,80 10,80 89,65
0.08
0.39
0,39
0.31
0.26
0,27
0,49
0.34
0.30
0,39
0,57
0.36
0,08
0.27
0.56
0,74
0,10
0,37
0,47
0.06
0.12
0,64
0,47
0,24
0,36
Srvy
tool
type
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
Tool
qual
type
[(c)1999 Anadrill IDEAL ID6 0C 04]
-- --
ANADRILL SCHLUMBERGER Survey Report 2-Sep-1999 23:37:55 Page 8 of 15
Seq Measured Incl Azimuth Course
# depth angle angle length
- (ft) (deg) (deg) (ft)
181 2004.73 0.57 108.70
182 2015.73 0,50 109.47
183 2026.83 0.45 113.18
184 2037.83 0.38 114.60
185 2048.83 0.32 113.88
11.05
11.00
11.10
11.00
11.00
186 2059.93 0.25 113.08
187 2070.93 0.13 113.71
188 2081.98 0.05 179.17
189 2092.98 0.12 215.66
190 2103.93 0.17 184.55
11.10
11,00
11.05
11.00
10.95
191 2114.93 0.17 175.98
192 2125.88 0.13 144.77
193 2136.88 0,17 85.33
194 2147.88 0.25 38.13
195 2158.88 0.42 12.40
11.00
10.95
11.00
11.00
11.00
196 2169.98 0.62 356.29
197 2181.08 0,77 349.15
198 2192.08 0.87 345.53
199 2203.18 0.92 343.22
200 2214.23 0.93 341.50
11.10
11.10
11.00
11.10
11.05
201 2225.28 0.93 340.13
~02 2236.33 0.93 339.31
203 2247.38 0.95 338.54
204 2258.43 0.97 338.06
205 2269.48 0.97 337.87
11.05
11.05
11.05
11.05
11.05
206 2280.53 0.97 337.68
207 2291.53 0.98 336.52
208 2302,53 0.97 330.51
209 2313.53 0.90 326.00
210 2324.43 0.85 327.45
11.05
11.00
11.00
11.00
10.90
TVD
depth
(ft)
2004.66
2015.66
2026.76
2037.76
2048.76
2059.86
2070.86
2081.91
2092.91
2103.86
2114.86
2125.81
2136.81
2147.81
2158.81
2169.91
2181.01
2192.01
2203,11
2214.15
2225.20
2236.25
2247.30
2258.35
2269.40
2280.45
2291.44
2302.44
2313.44
2324.34
Vertical Displ Displ Total At DLS Srvy Tool
section +N/S- +E/W- displ Azim (deg/ tool qual
(ft) (ft) (ft) (ft) (deg) 100f) type type
-8.65 0.03
-8.75 -0.01
-8.84 -0,04
-8.91 -0.07
-8.98 -0.10
-9.03 -0.12
-9.07 -0.14
-9.08 -0.15
-9.09 -0.16
-9.10 -0.19
-9.12 -0.22
-9.14 -0.25
-9.16 -0.25
-9.18 -0.23
-9.16 -0.18
-9.10 -0.08
-9.01 0.06
-8.89 0.21
-8,75 0.38
-8.60 0.55
-8.45 0.72
-8.30 0.88
-8.15 1~05
-7.99 1.23
-7.83 1.40
-7.66 1.57
-7.50 1.74
-7,33 1.91
-7.17 2.06
-7.01 2.20
10.91
11.01
11.09
11.17
11,23
11.28
11.31
11.32
11.32
11.31
11.31
11.32
11.34
11.37
11.39
11.40
11.38
11.35
11.30
11,25
11.19
11.12
11,06
10.99
10.92
10.85
10.78
10.69
10,60
10.51
10.91
11.01
11.09
11.17
11,23
11.28
11.31
11.32
11.32
11.31
11.31
11.32
11.34
11.37
11,40
11.40
11.38
11.35
11.31
11.26
11,21
11.16
11.11
11.06
11.01
10,96
10.92
10.86
10.80
10.74
89.86
90,04
90,21
90.38
90.51
90.62
90.70
90.74
90.82
90.95
91.11
91.24
91.29
91.18
90.89
90.38
89.71
88.94
88.09
87.21
86.34
85.45
84.56
83.64
82.70
81.75
80.80
79.86
78,98
78,15
0.76
0.64
0.53
0.64
0.55
0.63
1.09
1.07
0.77
0.84
0.23
0.82
1.39
1.67
2.03
2.22
1.56
1.02
0.56
0.27
0.20
0,12
0.21
0.20
0.03
0,03
0.20
0.93
0.92
0.5O
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
[(c)1999 Anadrill IDEAL ID6 0C 04]
ANADRILL SCHLUMBERGER Survey Report
Seq Measured Incl Azimuth
# depth angle angle
- (ft) (deg) (deg)
211 2335.43 0.85 329.39
212 2346,43 0.83 331,86
213 2357.48 0.83 333.98
214 2368.53 0,87 335,13
215 2379.53 0,90 335.91
Course
length
(ft)
11,00
11,00
11.05
11,05
11,00
216 2390,58 0,90 336,78
217 2401,63 0,88 337,69
218 2412,68 0,87 338,95
219 2423.68 0.85 342.32
220 2434,68 0,83 346,75
11,05
11,05
11,05
11.00
11,00
221 2445,78 0,83 349,97
222 2456.78 0,85 352,04
223 2467,78 0,93 352,66
224 2478.78 0,98 352,79
225 2489,78 1,02 353,85
11,10
11.00
11,00
11,00
11,00
226 2500,68 1.02 354,52
227 2511,68 1,02 354,06
228 2522.68 1,03 352.78
229 2533,63 1.05 351.12
230 2544,58 1,03 351,16
10.90
11,00
11,00
10,95
1.0,95
231 2555,63 1,02 352,10
232 2566.68 1.00 352.29
233 2577,73 1.02 353,48
234 2588.73 1.05 355,12
235 2599,68 1,10 356,17
11,05
11,05
11,05
11.00
10,95
236 2610,53 1,13 357,12
237 2621,43 1,18 358,67
238 2632,33 1,25 359.83
239 2643,13 1,30 0,45
240 2654,03 1,37 1.31
10,85
10,90
10,90
10,80
10.90
2-Sep-1999 23:37:55
Page
TVD Vertical Displ Displ Total At
depth section +N/S- +E/W- displ Azim
(ft) (ft) (ft) (ft) (ft) (deg)
9 of 15
DLS
(deg/
100f)
Srvy
tool
type
2335,34 -6,86 2,34 10,42 10,68 77,33 0,26 GYRO
2346.34 -6.71 2.48 10.34 10,64 76,50 0.38 GYRO
2357,39 -6,56 2,63 10,27 10,60 75,66 0,28 GYRO
2368,43 -6.42 2,77 10,20 10,57 74.79 0.39 GYRO
2379,43 -6,27 2,93 10,13 10,54 73,87 0,29 GYRO
2390,48 -6.12 3,09 10,06 10,52 72.94 0,12 GYRO
2401.53 -5.97 3.25 9.99 10,51 72.01 0.22 GYRO
2412,58 -5,82 3,40 9,93 10,50 71,09 0,20 GYRO
2423,58 -5,68 3,56 9,88 10,50 70,19 0,49 GYRO
2434,58 -5,56 3,71 9.83 10,51 69,31 0,62 GYRO
2445.68 -5,43 3.87 9.80 10,54 68.45 0.42 GYRO
2456,67 -5,32 4,03 9,78 10.57 67,59 0,33 GYRO
2467.67 -5.20 4,20 9.75 10.62 66.70 0.73 GYRO
2478,67 -5,07 4,38 9.73 10,67 65,76 0.45 GYRO
2489,67 -4,93 4,57 9,71 10.73 64,78 0,40 GYRO
2500.57 -4,80 4,77 9.69 10,80 63,81 0,11
2511.57 -4.67 4,96 9,67 10,87 62,84 0.07
2522,56 -4,53 5.16 9,65 10,94 61,88 0,23
2533,51 -4.39 5.35 9.62 11.01 60.90 0.33
2544,46 -4,25 5.55 9,59 11,08 59,94 0,18
2555,51 -4.10 5,74 9,56 11,15 59,00 0,18
2566.56 -3.9'7 5,94 9,53 11,23 58,08 0.18
2577,61 -3,83 6,13 9,51 11,31 57,19 0,26
2588,60 -3,69 6,33 9,49 11,40 56,30 0,38
2599,55 -3,56 6,53 9,47 11,51 55,41 0.49
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
GYRO
2610,40 -3,42 6,74 9.46 11,62 54,52 0.32 GYRO
2621,30 -3,28 6,96 9,45 11,74 53,62 0.54 GYRO
2632,20 -3,14 7,19 9.45 11,88 52,72 0,68 GYRO
2642,99 -2,99 7,43 9,45 12,02 51,81 0,48 GYRO
2653,89 -2,84 7,69 9,45 12,19 50,88 0,67 GYRO
Tool
qual
type
[(c)1999 Anadrill IDEAL ID6 0C 04]
ANADRILL SCHLUMBERGER Survey Report
Seq
241
242
243
244
245
Measured Incl Azimuth
depth angle angle
(ft) (deg) (deg)
2664.83 1.42 1.74
2670.00 2.20 5.20
2700.00 5.09 354.30
2730.00 6.92 356.00
2760.00 8.47 354.45
Course
length
(ft)
10.80
5.17
30.00
30.00
30.00
246 2782.00 9.84 352.16
247 2818.22 12.17 351.60
248 2849.49 14.07 350.62
249 2880.34 14.91 348.84
250 2910.95 15.24 340.88
22.00
36.22
31.27
30.85
30.61
251 2941.91 15.51 337.60
252 2976.51 17.58 331.84
253 3003.85 17.56 331.91
254 3035.40 19.27 329.59
255 3067.75 19.17 328.16
30.96
34.60
27.34
31.55
32.35
256 3099.11 21.39 325.08
257 3131.66 23.48 323.68
258 3162.68 23.35 322.13
259 3193.13 25.30 320.17
260 3225.28 28.49 319.38
31.36
32.55
31.02
30.45
32.15
31.93
30.47
32.09
31.45
29.25
261 3257.21 29.42 319.51
962 3287.68 31,49 319.31
263 3319.77 34.18 319.78
264 3351.22 34.68 319.09
265 3380.47 37.14 319.09
266 3472.90 40.02 319.33
267 3566.85 42.05 315.74
268 3660.19 44.39 314.12
269 3754.10 44.25 313.41
270 3847.85 42.93 312.73
92.43
93.95
93.34
93.91
93.75
2-Sep-1999 23:37:55
TVD Vertical Displ Displ Total
depth section +N/S- +E/W- displ
(ft) (ft) (ft) (ft) (ft)
2664.69 -2.69 7.95 9.46 12.36
2669.85 -2.60 8.11 9.47 12.47
2699.79 -1.38 10.01 9.39 13.73
2729.63 0.72 13.14 9.13 16.00
2759.35 3.43 17.14 8.79 19.27
2781.07
2816.63
2847.08
2876.95
2906.51
2936.36
2969.53
2995.59
3025.52
3056.07
3085.49
3115.57
3144.04
3171.78
3200.45
3228.39
3254.66
3281.62
3307.56
3331.25
3403.49
3474.37
3542.38
3609.57
3677.47
Page
At
Azim
(deg)
49.95
49.41
43.17
34.80
27.16
5.86 20.62 8.38 22.26 22.12
10.80 27.46 7.40 28.44 15.08
15.93 34.47 6.30 35.04 10.36
21.64 42.07 4.92 42.35 6.67
27.95 49.73 2.84 49.81 3.27
34.92 57.40 -0.07 57.40
43.68 66.29 -4.30 66.43
51.19 73.57 -8.19 74.02
60.34 82.26 -13.07 83.29
70.25 91.37 -18.57 93.24
359.93
356.29
353.65
350.97
348.51
80.52 100.44 -24.56 103.40 346.26
92.40 110.53 -31.80 115.01 343.95
104.27 120.36 -39.24 126.60 341.95
116.46 130.12 -47.11 138.39 340.10
130.66 141.22 -56.50 152.11 338.19
145.78 152.97 -66.55 166.82 336.49
160.88 164.69 -76.60 181.64 335.06
177.89 177.93 -87.89 198.46 333.71
195.28 191.44 -99.45 215.73 332.55
212.08 204.41 -110.69 232.45 331.56
268.49 248.04 -148.33 289.01 329.12
329.19 293.50 -189.99 349.63 327.08
392.56 338.62 -235.25 412.32 325.21
457.76 384.01 -282.63 476.80 323.65
522.08 428.15 -329.85 540.47 322.39
10 of 15
DLS
(deg/
100f)
0.47
15.23
9.86
6.13
5.21
6.44
6.44
6.12
3.08
6.84
2.94
7.63
0.11
5.9O
1.49
7.85
6.63
2.03
6.93
9.98
2.92
6.80
8.42
2.02
8.41
3.12
3.31
2.77
0.55
1.49
S rvy
tool
type
TIP
GYRO
GYRO
GYRO
GYRO
GYRO
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
Tool
qual
type
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
[(c)1999 Anadrill IDEAL ID6 0C 04]
,
ANADRILL SCHLUMBERGER Survey Report
2-Sep-1999 23:37:55
Page 11 of 15
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool qual
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
271 3941.45 40.48 313.33 93.60 3747.35 584.05 470.63 -375.37 602.00 321.42 2.65 MWD 6-axis
272 4034.36 40.09 314.59 92.91 3818.23 643.73 512.33 -418.61 661.60 320.75 0.97 MWD 6-axis
273 4127.77 39.72 314.63 93.41 3889.88 703.18 554.41 -461.27 721.21 320.24 0.40 MWD 6-axis
274 4219.58 39.76 317.92 91.81 3960.49 761.15 596.82 -501.83 779.76 319.94 2.29 MWD 6-axis
275 4311.41 39.89 318.95 91.83 4031.01 818.88 640.82 -540.85 838.55 319.84 0.73 MWD 6-axis
276 4402.98 39.20 318.33 91.57 4101.62 876.06 684.58 -579.37 896.84 319.76 0.87 MWD 6-axis
277 4495.96 40.41 319.65 92.98 4173.05 934.36 729.50 -618.42 956.35 319.71 1.59 MWD 6-axis
278 4591.03 40.63 319.97 95.07 4245.32 994.69 776.68 -658.28 1018.12 319.72 0.32 MWD 6-axis
279 4685.52 40.03 320.56 94.49 4317.36 1054.31 823.71 -697.37 1079.27 319.75 0.75 MWD 6-axis
280 4778.35 39.34 319.83 92.83 4388.80 1112.11 869.25 -735.32 1138.55 319.77 0.90 MWD 6-axis
281 4872.01 40.80 320.02 93.66 4460.47 1170.96 915.38 -774.13 1198.84 319.78 1.56 MWD 6-axis
282 4965.35 40.90 319.47 93.34 4531.07 1230.60 961.98 -813.58 1259.89 319.78 0.40 MWD 6-axis
283 5058.96 40.76 319.98 93.61 4601.90 1290.40 1008.67 -853.15 1321.09 319.78 0.39 MWD 6-axis
284 5151.18 40.28 320.43 92.22 4672.01 1348.82 1054.71 -891.50 1381.01 319.79 0.61 MWD 6-axis
285 5244.43 39.71 319.64 93.25 4743.45 1407.30 1100.64 -929.99 1440.94 319.80 0.82 MWD 6-axis
286 5337.56 40.83 319.57 93.13 4814.50 1466.14 1146,49 -969.00 1501.13 319.80 1.20 MWD 6-axis
287 5430.70 41.04 319.32 93.14 4884.87 1525.82 1192.85 -1008.68 1562.16 319.78 0.29 MWD 6-axis
288 5523.73 40.61 320.17 93.03 4955.26 1585.23 1239.27 -1047.98 1622.98 319.78 0.76 MWD 6-axis
289 5619.31 40.63 320.17 95.58 5027.81 1645.92 1287.05 -1087.84 1685.20 319.80 0.02 MWD 6-axis
290 5712.71 40.17 319.08 93.40 5098.94 1705.08 1333.17 -1127.05 1745.73 319.79 0.90 MWD 6-axis
291 5807.20 40.03 317.68 94.49 5171.22 1764.83 1378.67 -1167.47 1806.58 319.74 0.97 MWD 6-axis
292 5893.75 41.75 316.85 86.55 5236.65 1820.64 1420.28 -1205.92 1863.18 319.67 2.08 MWD 6-axis
293 5987.05 42.34 316.09 93.30 5305.93 1882.34 1465.57 -1248.96 1925.57 319.56 0.84 MWD 6-axis
294 6080.39 42.07 315.44 93.34 5375.08 1944.38 1510.50 -1292.70 1988.14 319.44 0.55 MWD 6-axis
295 6172.93 42.01 316.61 92.54 5443.80 2005.65 1555.10 -1335.72 2050.00 319.34 0.85 MWD 6-axis
296 6266.25 42.03 316.61 93.32 5513.13 2067.31 1600.49 -1378.64 2112.39 319.26 0.02 MWD 6-axis
297 6357.85 41.99 315.92 91.60 5581.19 2127.88 1644.79 -1421.02 2173.62 319.17 0.51 MWD 6-axis
298 6451.93 41.95 315.89 94.08 5651.14 2190.10 1689.97 -1464.80 2236.43 319.08 0.05 MWD 6-axis
299 6546.22 42.02 316.90 94.29 5721.23 2252.40 1735.63 -1508.31 2299.44 319.01 0.73 MWD 6-axis
300 6640.59 41.74 317.28 94.37 5791.49 2314.50 1781.78 -1551.20 2362.40 318.96 0.40 MWD 6-axis
[(c) 1999 Anadrill IDEAL ID6 0C 04]
ANADRILL SCHLUMBERGER Survey Report
2-Sep-1999 23:37:55
Page 12 of 15
Seq Measured Incl Azimuth Course
# depth angle angle length
- (ft) (deg) (deg) (ft)
TVD Vertical Displ
depth section +N/S-
(ft) (ft) (ft)
Disp1 Total At DLS Srvy Tool
+E/W- displ Azim (deg/ tool qual
(ft) (ft) (deg) 100f) type type
301 6732.86 41.32 320.35 92.27 5860.57 2374.45 1827.80 -1591.48 2423.56 318.95 2.25
302 6827.69 41.08 320.33 94.83 5931.93 2435.33 1875.89 -1631.34 2486.01 318.99 0.25
303 6922.47 41.06 320.27 94.78 6003.38 2496.03 1923.80 -1671.12 2548.26 319.02 0.05
304 7015.71 40.93 320.48 93.24 6073.75 2555.63 1970.91 -1710.13 2609.41 319.05 0.20
305 7108.20 40.82 320.02 92.49 6143.69 2614.64 2017.44 -1748.83 2669.92 319.08 0.35
MWD 6-axis
MWD 6-axis
MWD 6-axis
MWD 6-axis
MWD 6-axis
306 7200.81 40.73 319.26 92.61 6213.82 2673.75 2063.53 -1788.00 2730.40 319.09 0.54
307 7294.87 40.70 320.13 94.06 6285.12 2733.69 2110.32 -1827.68 2791.75 319.11 0.60
, 308 7388.50 40.71 320.01 93.63 6356.10 2793.27 2157.14 -1866.88 2852.80 319.13 0.08
309 7480.92 40.09 320.11 92.42 6426.48 2851.71 2203.07 -1905.33 2912.69 319.15 0.67
310 7573.89 38.40 320.56 92.97 6498.47 2909.03 2248.34 -1942.87 2971.50 319.17 1.84
MWD 6-axis
MWD 6-axis
MWD 6-axis
MWD 6-axis
MWD 6-axis
311 7666.34 37.28 321.10 92.45 6571.48 2964.20 2292.31 -1978.70 3028.19 319.20 1.26
312 7761.79 35.19 321.53 95.45 6648.47 3018.96 2336.34 -2013.97 3084.57 319.24 2.21
313 7855.02 34.42 321.22 93.23 6725.02 3070.60 2377.91 -2047.18 3137.74 319.27 0.85
314 7948.22 34.20 322.05 93.20 6802.00 3121.52 2419.10 -2079.79 3190.23 319.31 0.55
315 8041,06 33.83 321.88 92.84 6878.96 3171.78 2460.01 -2111.79 3242.11 319.36 0.41
MWD 6-axis
MWD 6-axis
MWD 6-axis
MWD 6-axis
MWD 6-axis
316 8135.45 32.98 321.97 94.39 6957.75 3222.09 2500.92 -2143.83 3294.03 319.40 0.90
317 8226.03 33.03 323.25 90.58 7033.72 3269.70 2540.12 -2173.79 3343.29 319.44 0.77
318 8318.74 32.43 323.24 92.71 7111.71 3317.92 2580.28 -2203.79 3393.31 319.50 0.65
319 8418.19 31.98 324.47 99.45 7195.86 3368.75 2623.08 -2235.05 3446.16 319.57 0.80
320 8506.80 31.42 324.72 88.61 7271.25 3413.23 2661.03 -2262.03 3492.54 319.63 0.65
MWD 6-axis
MWD 6-axis
MWD 6-axis
MWD 6-axis
MWD 6-axis
321 8599.06 30.81 324.58 92.26 7350.23 3458.76 2699.91 -2289.61 3540.04 319.70 0.67
322 8692.60 30.21 325.00 93.54 7430,82 3504.08 2738.71 -2316.99 3587.34 319.77 0.68
323 8786.51 30.03 325.77 93.91 7512.05 3548.90 2777.49 -2343.76 3634.24 319.84 0.45
324 8881.20 30.03 323.72 94.69 7594.04 3594.13 2816.19 -2371.11 3681.45 319.90 1.08
325 8972.62 30.24 325.01 91.42 7673.10 3638.03 2853.49 -2397.85 3727.21 319.96 0.74
MWD 6-axis
MWD 6-axis
MWD 6-axis
MWD 6-axis
MWD 6-axis
326 9065.93 30.87 324.43 93.31 7753.45 3683.31 2892.21 -2425.25 3774.48 320.02 0.75 MWD 6-axis
327 9160.50 31.23 325.26 94.57 7834.47 3729.84 2932.09 -2453.33 3823.09 320.08 0.59 MWD 6-axis
328 9254.11 30.57 325.53 93.61 7914.80 3775.56 2971,66 -2480.64 3870.96 320.15 0.72 MWD 6-axis
329 9346.88 29.68 325.65 92.77 7995.04 3819.80 3010.07 -2506.95 3917.31 320.21 0.96 MWD 6-axis
330 9440.60 28.69 328,13 93.72 8076.86 3862.88 3048.33 -2531.92 3962.69 320.29 1.67 MWD 6-axis
[(c) 1999 Anadrill IDEAL ID6 0C 04]
,
ANADRILL SCHLUMBERGER Survey Report
Seq Measured Incl Azimuth Course
# depth angle angle length
- (ft) (deg) (deg) (ft)
331 9533.55 29.94 325.45
332 9627.03 29.35 324.90
333 9721.11 30.12 325.50
334 9814.34 30.05 325.50
335 9908.50 30.00 326.44
92.95
93.48
94.08
93.23
94.16
336 10001.68 28.75 327.49
337 10093.62 27.63 328.29
338 10105.91 27.39 327.55
339 10169.03 27.55 327.55
340 10198.45 30.91 324.64
93.18
91.94
12.29
63.12
29.42
341 10228.91 38.06 321.63
342 10259.94 45.38 318.57
343 10289.39 51.77 315.46
344 10321.03 59.21 312.46
345 10352.37 66.50 308.34
30.46
31.03
29.45
31.64
31.34
346 10383.44 72.16 305.65
347 10411.94 70.65 298.86
348 10446.92 69.96 289.20
349 10476.81 75.09 283.79
350 10512.63 83.47 283.22
31.07
28.50
34.98
29.89
35.82
351 10539.84 84.16 283.28
352 10570.24 84.68 287.36
353 10603.04 86.02 289.28
354 10634.07 87.43 290.42
355 10663.15 87.29 290.45
27.21
30.40
32.80
31.03
29.08
356 10696.90 87.19 289.84
357 10727.89 87.22 289.98
358 10757.17 87.26 289.68
359 10788.56 87.43 290.98
360 10819.31 86.33 292.04
33.75
30.99
29.28
31.39
30.75
TVD
depth
(ft)
8157.91
8239.15
8320.84
8401.51
8483.04
8564.24
8645.27
8656.17
8712.18
8737.85
8762.94
8786.09
8805.57
8823.48
8837.78
8848.74
8857.84
8869.65
8878.63
8885.29
8888.22
8891.18
8893.84
8895.61
8896.95
8898.57
8900.08
8901.49
8902.95
8904.62
2-Sep-1999 23:37:55
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
3905.80
3949.83
3994.26
4038.68
4083.34
3086.39
3124.34
3162.66
3201.18
3240.22
-2556.86
-2583.26
-2609.89
-2636.36
-2662.72
4126.41
4167,09
4172.41
4199.74
4213.35
3278.53
3315.32
3320.13
3344.70
3356.61
-2687.65
-2710.74
-2713.75
-2729.37
-2737.40
4229.95
4250.08
4271.84
4297.73
4325.55
3370.37
3386.17
3402.29
3420.35
3438.38
-2747.77
-2761.04
-2776.10
-2794.87
-2816.11
4354.60
4381.49
4413.48
4440.09
4472.24
3455.86
3470.27
3483.67
3491.74
3499.95
-2839.32
-2862.15
-2892.18
-2919.50
-2953.69
4496.92
4524.95
4555.85
4585.38
4613.17
3506.15
3514.14
3524.41
3534.93
3545.07
-2980.02
-3009.20
-3040.23
-3069.37
-3096.59
4645.36
4674.88
4702.77
4732.74
4762.27
3556.68
3567.23
3577.15
3588.04
3599.30
-3128.24
-3157.34
-3184,85
-3214.26
-3242.82
Page
Total
disp1
(ft)
At
Azim
(deg)
320.36
320.42
320.47
320.53
320.59
4007.90
4053.98
4100.48
4147.04
4193.94
4239.37
4282.46
4288.09
4317.00
4331.30
4348.52
4369.15
4391.16
4417.03
4444.43
4472.66
4498.29
4527.76
4551.45
4579.73
4601.48
4626.49
4654.51
4681.54
4707.06
4736.65
4763.81
4789.50
4817.21
4844.67
320.66
320.73
320.74
320.78
320.80
320.81
320.81
320.79
320.75
320.68
320.59
320.49
320.30
320.10
319.84
319.64
319.43
319.22
319.03
318.86
318.67
318.49
318.32
318.15
317.98
13 of 15
DLS
(deg/
100f)
1.95
0.70
0.88
0.08
0.50
1.45
1.29
3.40
0.25
12.40
24.12
24.48
23.09
24.77
26.03
19.93
23.19
26.07
24.34
23.45
2.55
13.47
7.12
5.84
0.49
1.83
0.46
1.03
4.17
4.96
Srvy
tool
t~e
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
M'WD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
Tool
qual
type
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
[(c) 1999 Anadrill IDEAL ID6 0C 04]
ANADRILL SCHLUMBERGER Survey Report 2-Sep-1999 23:37:55 Page 14 of 15
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool qual
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
361 10848.45 86.23 292.72 29.14 8906.51 4790.36 3610.37 -3269.71 4870.91 317.83 2.35 MWD 6-axis
362 10881.71 86.29 292.55 33.26 8908.68 4822.45 3623.14 -3300.34 4900.96 317,67 0.54 MWD 6-axis
363 10913.90 86.13 291.98 32.19 8910.81 4853,45 3635.31 -3330.07 4929.99 317.51 1.84 MWD 6-axis
364 10943.21 86.02 292.46 29.31 8912.82 4881.68 3646.37 -3357,14 4956.45 317.36 1.68 MWD 6-axis
365 10978.77 85.81 291.22 35.56 8915.35 4915.84 3659.57 -3390.06 4988.48 317.19 3.53 MWD 6-axis
366 11010.46 85.89 291.38 31.69 8917.64 4946.21 3671.05 -3419.51 5016.93 317.03 0.56 MWD 6-axis
367 11036.13 85.92 291.38 25.67 8919.48 4970.82 3680.38 -3443.35 5040.03 316.91 0.12 MWD 6-axis
368 11073.29 85.02 291.42 37.16 8922.41 5006.43 3693.90 -3477.84 5073.48 316.73 2.42 MWD 6-axis
369 11104.64 83.58 288.58 31.35 8925.52 5036.19 3704.57 -3507.15 5101.36 316.57 10.12 MWD 6-axis
370 11132.11 83.40 288.35 27.47 8928.64 5062.01 3713.21 -3533.04 5125.45 316.42 1.06 MWD 6-axis
371 11163.52 83.30 289.57 31.41 8932,28 5091.61 3723.35 -3562.54 5153.16 316.26 3.87 MWD 6-axis
372 11197.89 83.06 289.59 34.37 8936.36 5124.10 3734.78 -3594.70 5183.67 316.09 0.70 MWD 6-axis
373 11223.25 82.51 288.61 25.36 8939.54 5147.98 3743.02 -3618.47 5206.10 315,97 4.40 MWD 6-axis
374 11260.47 81.88 287.55 37.22 8944.60 5182.78 3754.46 -3653.52 5238.72 315.78 3.29 MWD 6-axis
375 11292.04 81.67 287.86 31.57 8949.11 5212.20 3763.96 -3683.29 5266.31 315.62 1.18 MWD 6-axis
376 11318.32 81.61 288.77 26.28 8952.94 5236.77 3772.13 -3707.97 5289.43 315.49 3.43 MWD 6-axis
377 11352.30 81.30 289.40 33.98 8957.98 5268.67 3783.12 -3739.73 5319.54 315.33 2.05 MWD 6-axis
378 11382.56 81.26 289.20 30.26 8962.57 5297.10 3793.01 -3767.96 5346.44 315.19 0.67 MWD 6-axis
379 11412.26 80.92 289.18 29.70 8967.17 5324.97 3802.65 -3795.67 5372.82 315.05 1.15 MWD 6-axis
380 11445.25 80.46 288.18 32.99 8972.51 5355.80 3813.08 -3826.51 5402.01 314,90 3.30 MWD 6-axis
381 11477.28 80.40 288.20 32.03 8977.83 5385.63 3822.94 -3856.51 5430.24 314.75 0.20 MWD 6-axis
382 11505.68 80.33 289.18 28.40 8982.59 5412.15 3831.91 -3883.04 5455.41 314.62 3.41 MWD 6-axis
383 11536.88 80.15 289.06 31.20 8987.88 5441.35 3841.98 -3912.09 5483.18 314.48 0.69 MWD 6-axis
384 11567.94 80.94 286.96 31.06 8992.98 5470.24 3851.45 -3941.22 5510.62 314.34 7.14 MWD 6-axis
385 11597.88 82.75 288,49 29.94 8997.23 5498.15 3860.47 -3969.45 5537.13 314.20 7.88 MWD 6-axis
386 11629.69 83.54 288.02 31.81 9001.02 5527.98 3870.37 -3999.44 5565.55 314.06 2.88 MWD 6-axis
387 11664.18 85.33 288.60 34.49 9004.37 5560.42 3881.15 -4032.03 5596.48 313.91 5.45 MWD 6-axis
388 11691.04 85.95 287,72 26.86 9006.41 5585.71 3889.50 -4057.48 5620.62 313.79 4.00 MWD 6-axis
389 11722.64 89.31 288.93 31.60 9007.72 5615.54 3899.42 -4087.45 5649.14 313.65 11.30 MWD 6-axis
390 11757.81 90.24 290.25 35.17 9007.85 5649.03 3911.22 -4120.58 5681.27 313.51 4.59 MWD 6-axis
[(c) 1999 Anadrill IDEAL ID6_0C_04]
ANADRILL SCHLUMBERGER Survey Report 2-Sep-1999 23:37:55 Page 15 of 15
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ
# depth angle angle length depth section +N/S- +E/W-
- (ft) (deg) (deg) (ft) (ft) (ft) ., (ft) (ft)
391 11784.40 90.75 288.26 26.59 9007.62 5674.29 3919.98 -4145.68
392 11819.61 94.60 288.93 35.21 9005.98 5707.58 3931.20 -4179.01
393 11850.83 95.49 289.45 31.22 9003.24 5737.12 3941.42 -4208.38
394 11878.05 95.35 289.97 27.22 9000.67 5762.94 3950.56 -4233.89
395 11912.26 94.87 289.29 34.21 8997.62 5795.38 3962.00 -4265.98
396 11943,73 94,80 289,72
397 11972.36 95,01 289.80
398 12005,83 95,11 290,81
399 12037.75 95,49 290,46
400 12064,79 95,39 291,01
31,47
28.63
33.47
31,92
27,04
401 12097.35 95,39 291,23
402 12128,46 95,63 291,06
403 12158,30 95,98 289,46
404 12189,93 96,42 289.65
405 12224.23 96.42 289,79
8994,97
8992,52
8989.57
8986,62
8984.05
406 12252.18 96.49 290,40
407 12284.43 96,56 289,28
408 12315,06 96,66 289,76
409 12344.63 96,32 288.38
410 12376,67 96,60 288,93
5825,23 3972,47 -4295,54
5852,41 3982,12 -4322,39
5884,28 3993,69 -4353,65
5914,71 4004,89 -4383,40
5940,50 4014,42 -4408.57
411 12411,38 96,77 289,66
412 12440.19 96,63 288,79
413 12473,70 95,15 286,06
414 12505.30 95,29 286.14
415 12531,42 95,53 286,38
32.56 8981,00 5971,61 4026,10 -4438,81
31,11 8978,01 6001,34 4037,27 -4467,69
29,84 8974.99 6029.71 4047,55 -4495,54
31,63 8971,57 6059,64 4058,07 -4525,17
34.30 8967,74 6092,12 4069,58 -4557,26
416 12624,73 95,46 287,67
417 12643.81 95,53 288,54
27.95 8964.60 6118,63 4079~t2 -45.83.34
·
32.25 8960,93 6149,18 4089,99 -4613,48
30,63 8957,41 6178,13 4100,16 -4642,16
29.57 8954.06 6206,02 4109,76 -4669.92
32,04 8950,46 6236,17 4119,94 -4700,09
Survey Projected to TD:
418 12699.00 95,53 288,54
34,71 8946,42 6268,94 4131,33 -4732,63
28.81 8943,06 6296,12 4140,75 -4759,64
33,51 8939,62 6327,45 4150,73 -4791,44
31,60 8936,74 6356,77 4159,46 -4821,68
26,12 8934.28 6381.02 4166.74 -4846,64
93.31
19,08
8925.34 6468.09 4193,94 -4935.45
8923,52 6486,01 4199,84 -4953,50
8918,20
55,19
6538,00 4217,30 -5005,58
Total At DLS
displ Azim (deg/
(ft) (deg) 100f)
5705,52 313,40 7,73
5737.46 313,25 11.10
5765,87 313,12 3,30
5790,75 313,02 1.97
5822,04 312,88 2,43
5850,83 312,76 1.38
5877,10 312,65 0.78
5907.95 312,53 3,02
5937,45 312,42 1,62
5962,47 312.32 2,06
5992,71 312,21 0,67
6021,61 312,10 0,94
6049,18 312,00 5.46
6078,25 311,89 1,51
6109,83 311.76 0,41
6135,65 311.67 2,18
6165.41 311.56 3,46
6193,62 311,45 1.59
6220.80 311.35 4.78
6250,18 311,24 1.92
6282,17 311,12 2,15
6308,73 311,02 3,04
6339,28 310,90 9,23
6367,86 310.78 0,51
6391,53 310,69 1.30
6476,71 310,36 1,38
6494,29 310,29 4,55
6545,34 310,11 0,00
Srvy
tool
type
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
Tool
qual
type
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
[(c) 1999 Anadrill IDEAL ID6_0C_04] :,,,:,, ....,,,
MEMORANDUM
TO:
State of Alaska
Alaska Oil and Gas Conservation Commission
Robert Christenson//r~ DATE: August 8, 1999
Chairman
L~'
THRU: Blair Wondzell, ,~~ FILE NO:
P. I. Supervisor
FROM:
Chuck Scheve, ~~ SUBJECT:
Petroleum Inspector
afskhhgf, doc
BOPE Test
Nabors 9ES
PBU S-24A
PTD # 98-245
Sunday, August 8, 1999: I traveled to BPXs S Pad Well 24A and witnessed the
initial BOPE test on Nabors Rig 9ES.
As the attached AOGCC BOPE Test Report indicates, the test lasted 2.5 hours and
there were no failures. The lower pipe rams were not tested at this time due to the
length of the cross-overs required to engage the tubing hanger. The above
mentioned rams were tested by the rig crew when the production tubing had been
laid down.
The testing went very well with the test procedure being practiced by the Nabors
crew allowing the testing to be completed in a minimum number of steps. The rig
was very clean and all equipment appeared to be in excellent condition. The
location was clean and all extra equipment was properly stored.
Summ~ry: I witnessed the initial BOPE test on Nabors Rig 9ES drilling BPXs S-
24A Well.
NABORS 9ES, 8~8~99, Test Time 2.5 Hours, No Failures
Attachment: afskhhgf.xls
X Unclassified Confidential (Unclassified if doc. removed )
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg:
Drlg Contractor:
Operator:
Well Name:
Casing Size:
Test: Initial
X Workover:
NABORS Rig No.
SSD
S-24Ai
Set @
X Weekly Other
9ES PTD #
Rep.:
Rig Rep.:
Location: Sec.
DATE: 8/8/99
98-245 Rig Ph.# 659-4831
John Rawl
Bixby / Klepzig
35 T. 12N R. 12E Meridian Urn.
MISC. INSPECTIONS:
Location Gen.: OK
Housekeeping: OK (Gen)
PTD On Location YES
Standing Order Posted YES
Well Sign OK
Drl. Rig OK
Hazard Sec. YES
BOP STACK:
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Quan.
1
Test Press. P/F
250/3500 P
250/4000 P
250/4000 P
250/4000 P
250/4000 P
250/4000 P
N/A
!M UD SYSTEM: Visual Alarm
Trip Tank OK OK
Pit Level Indicators OK OK
Flow Indicator OK OK
Meth Gas Detector OK OK
H2S Gas Detector OK OK
FLOOR SAFETY VALVES:
Upper Kelly/IBOP
Lower Kelly/IBOP
Ball Type
Inside BOP
Test
Quart. Pressure P/F
1 250 / 4000 P
250/4000 P
250/4000 P
250/4000 P
CHOKE MANIFOLD:
No. Valves '/4
No. Flanges 32
Manual Chokes '/
Hydraulic Chokes '/
Test
Pressure P/F
250/4,000 P
250/4,000 P
Functioned
Functioned
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure
System Pressure Attained
Blind Switch Covers: Master:
Nitgn. Btl's: 6 @2100
3,000 P
1,750 P
0 minutes 20 sec.
minutes 45 sec.
YES Remote: YES
Number of Failures: 0 ,Test Time: (2.5) Hours. Number of valves tested 23 . Repair or Replacement of Failed
Equipment will be made within 0 ~ Notify the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS:
Lower pipe rams to be tested when tubing is layed down.
·
Distribution:
orig-Well File
c- Oper./Rig
c- Database
c - Trip Rpt File
c- Inspector
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By:
Chuck Scheve
F1-021L (Rev. 12194) afskhhgf.xls
TONY KNOWLE$, GOVEFINOFI
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
August 2, 1999
Dan Stone
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Prudhoe Bav Unit S-24Ai Rev.
BP Exploration (Alaska) Inc.
Permit No: 98-245
Sur Loc: 1633'SNL. 1050'EWL. Sec. 35, T12N, R12E, UM
Btmhole Loc. 2486'NSL. 4319'WEL, Sec. 27, T12N. R12E. USM
Dear Mr. Stone:
Enclosed is the approved revised application for permit to drill the above referenced well. The
revision is for a change in bottom-hole location.
The provisions of the original approved permit dated December 4. 1998. are in effect for this
revision.
Chairman
BY ORDER OF THE COMMISSION
dlffEnclosures
CC~
Department of Fish & Game. Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA ~¢L AND GAS CONSERVATION COk .... ,ISSION
PERMIT TO DRILL
20 AAC 25.005 REVISED.. 07/19/99
la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] DeepenI I~Service [] Development Gas []Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan RKB = 65.43' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028258
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
1633' SNL, 1050' EWL, SEC. 35, T12N, R12E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number Number 2S100302630-277
1632' NSL, 1567' WEL, SEC. 27, T12N, R12E, UM S-24Ai
At total depth 9. Approximate spud date Amount $200,000.00
2486' NSL, 4319' WEL, SEC. 27, T12N, R12E, UM 08/01/99
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028256, 2794'I No Close Approach 2560 13041' MD / 8911' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 2700' MD Maximum Hole Angle 93.9° Maximum surface 2375 psig, At total depth (TVD) 8750' / 3250 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
9-7/8" 7" 26# L-80 BTC-M 10010' 35' 35' 10045' 8670' 815 sx Class 'G'
6-1/8" 4-1/2" 12.6# L-80 IBT-M 3146' 9895' 8542' 13041' 8910' 335 sx Class 'G'
..... lqq~
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary TOC P&A Plug at 9016' (07/99) &!asKa 0il & 6as 00ne, 0O~
Total depth: measured 10428 feet Plugs (measured) Anchorage
true vertical 9311 feet
Effective depth: measured 10017 feet Junk (measured) Perf assembly fish at 10183' (05/92); Fill on top of fish at
10112' (01/91)
true vertical 8961 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 110' 20" 139' 139'
Surface 2639' 13-3/8" 2580 cu ft Arcticset II & III 2668' 2668'
Intermediate 9804' 9-5/8" 2040 cuft Class 'G' 9843' 8816'
Production
Liner 838' 7" 258 cu ft Class 'G' 9590' - 10428' 8610' - 9311'
Perforation depth: measured Squeezed: 9834'-10132' 0RIG!~,~IAL.
true vertical Subsea 8873' - 8992' (three intervals)
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Bill Isaacson, 564-5521 James Smith, 564-5026 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that the/f~oregoing is true and correct to the best of my knowledge
Signed /~~~
Dan Stone Title Senior Drilling Engineer Date 7- ~'=1- '~ ~'
u.- ¢/¢'"'~mmission Use Only
PermitNumber I APINumber I ApprovalpCe I Seecoverletter
98-245 50-029-22044-01 J~, -" '~'-- for other requirements
Conditions of Approval: Samples Required []Yes [] No Mud Log Required []Yes l~"No
Hydrogen Sulfide Measures ~i]Yes [] No Directional Survey Required ,~]Yes [] No
Required Working Pressure for DOPE [] 2K; []3K; J~4K; [] 5K; [] 10K; [] 15K
Other:
ORIGINAL SIGNED-BY by order of
Approved By Robert N. Christenson Commissioner the commission Date ~' C;~ 7
Form 10-401 Rev. 12-01-85 Submit In Triplicate
S-24Ai Permit to Drill
I Well Name: I S-24Ai
Sidetrack Plan Summary
I Type of Redrill (producer or injector)' I Injector
Surface Location'
Target Location:
Bottom Hole Location:
3646' FSL 4229' FEL
1632' FSL 1567' FEL
2486' FSL 4319' FEL
S35 T12N R12E
S27 T12N R12E
S27 T12N R12E
Umiat
Umiat
Umiat
I AFENumber: 14P1200 I
I Estimated Start Date: 1 8/01/99
MD: 113,041' I I TVD: I 8911' I
I Rig: I Nabors9ES
I Operating days to complete:
I BF/MSL: 1 37.05' I
I RKB: 1 65.43'
I Well Design (conventional, slimhole, etc.)' I Extended Horizontal Sidetrack
I Objective: I
Development injection targeting upper Zone 4 sands.
Mud Program:
Intermediate Mud Pr°perties: LSND I 9-7/8" h°le iecti°n I II I
Density (PPg)l Funnel visI Yield Point 10 sec gel 10 min gel
9.6- 10.8 45-50 18-29 4-8 8-12
pH
9-10
I Fluid Loss
6-9
Production Mud Properties' Quickdril-n 1 6-1/8" hole section
Density (ppg) I Funnel visI LSRVI LSRYP
8.3 - 8.5 38-50 <12,000 cP 10-20
pH
8.5-9.0 I
Directional:
IKOP: I 2700' MD
Maximum Hole Angle:
Close Approach Well'
93.9° @ 11,778' (8996' TVD)
None
Logging Program:
Intermediate
Production Hole(Horizontal)
Drilling:
Open Hole:
Cased Hole:
Drilling'
Open Hole:
MWD / G R
GR / Resistivity / Neutron Density / Sonic / RFT
(across Kuparuk Interval)
CBT
MWD / GR / Resistivity
None
S-24Ai Permit to Drill
Formation Markers:
Formation Tops MD TVDss Comments
Base Permafrost 1880' Not Penetrated
13-3/8' Casing Shoe 2669' 2669'
SV3 / T5 2700' 2700' Kick-off with-in SV3
SV1 / T3 3310' 3200'
UG4 / K15-Cl 3763' 3550'
UG1 / UgS 4734' 4300' Est. pore pressure 2125 psi (9.5 ppg EMW)
WS1 / West Sak 5627' 4990' Est. pore pressure 2465 psi (9.5 ppg EMW)
CM3 / K-12 5899' 5200'
CM2 / K-10
CM-1 / K5
K2/Top HRZ
Kuparuk 7701' 6590' Est. pore pressure 3255 psi (9.5 ppg EMW)
LCU 7771' 6660'
Miluveach 7900' 6770'
Top Kingak (JG) 8753' 7550'
Sag River 10,045' 8600'
Shublik 10,092' 8645'
Top Sadlerochit/Z4B 10,231' 8750' Est. pore pressure 3100 psi (6.8 ppg EMW)
Top Z4A 11,538' 8900'
Maximum TVDss 11,741' 8932'
HOT 8990' Not Penetrated
OOWC 9025' Not Penetrated
Casing/Tubing Program:
Hole Csg/ Wt/Ft Grade Conn Length Top Btm
Size Tbg O.D. MDITVD MDITVD
9-7/8" 7" 26# L-80 BTC-M 10,010' ~35'/35' 10,045'/8670'
6-1/8" 4-1/2" 12.6# L-80 IBT-M 3146' 9895'/8542' 13,041'/8910'
Tubing 4-1/2" 12.6# L-80 NSCT 9862' ~33'/33' 9895'/8542'
NOTE: The 4 1/2" orocluction liner will be a Bonzai style completion with the solid cemented
section covering all but the end +~-500' of hole section, which will be uncemented slotted liner. As
a contingency, the liner will be a solid cemented liner all the way to TD
Cement Calculations:
Casing
Size
7" Intermediat,e
!
15ased on 2045 of open hole with 100% excess.
Basis' Lead:
Lead TOC: At ~7200' MD (6271' TVD), ~500' MD above the top Kuparuk reservoir.
Tail: Based on 80' shoe track volume and 800' of open hole with 38% excess.
Tail TOC: At ~9245' MD (7987' TVD).
Total C'ement Volume: Lead I 193 bbl / 1084 f¢ / 328 sks of BJ Services Premium 'G' at
1
11.0 ppg and 3.31 cf/sk.
ITai I 55 bbl/309 ft3 / 287 sks of BJ Services Premium 'G' at
1
15.8 ppg and 1.14 cf/sk.
Liner Size 14 W' Production I
Basis: Tail: Based on 2495' of open hole over solid cemented portion of liner with 50% excess,
150' of 7" x 4.5" liner lap and 200' of 7" x 4" drill pipe annulus volume.
Tail TOC: At top of liner -9,895' MD (8542' TVD).
Total Cement Volume' I Tail I 71 bbl/399 f¢ / 335 sks of BJ Services Premium 'G' at
I
1
15.8 ppg and 1.19' cf/sk.
S-24Ai Permit to Drill
Well Control:
Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams,
and annular preventer will be installed and is capable of handling maximum potential surface
pressures.
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
Intermediate Section-
- Maximum anticipated BHP: 3300 psi @ 6600' TVDss - Kuparuk
· Maximum surface pressure: 2640 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/fi)
Production Interval-
. Maximum anticipated BHP: 3250 psi @ 8750' TVDss - Zone 4
· Maximum surface pressure: 2375 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/ft
· Planned completion fluid:
8.5 ppg Seawater/6.8 ppg Diesel
Drilling Hazards/Contingencies:
HYDROGEN SULFIDE - H2S
· S Pad is not designated as an H2S drill site, however Standard Operating
Procedures for H2S precautions should be followed at all times. The highest level
of H2S recently measured on S Pad has been 60 ppi from S-37 in December of 98.
DRILLING CLOSE APPROACH:
· All wells pass close approach guidelines.
INTERMEDIATE SECTION:
· Gas cut mud has been observed in the Ugnu (4300' TVDss), West Sak (4990' TVDss),
and Kuparuk (6600' TVDss) sands. This will be controlled with appropriate mud
weights.
· The S-24Ai well path will drill full sections of both the HRZ and Kingak shale.
· Tight hole conditions and stuck pipe have been encountered in the Kingak shale
interval. Increased mud weights and the addition of shale stabilizers may be required.
· The kick tolerance for the 9-7/8" open hole section would be 19 bbls assuming an influx
from the Kuparuk interval at -,,7700' MD. This is a worst case scenario based on an
10.0 ppg pore pressure gradient, a fracture gradient of 12.0 ppg at the surface casing
shoe, and 10.4 ppg mud in the hole.
PRODUCTION SECTION:
· Differential sticking will be a problem if loss circulation is occurring or if the drill string is
left stationary for an extended period or time.
· The kick tolerance for the 7" shoe would be an infinite influx (annular volume) assuming
an influx at section TD of 13,040'. This is a worst case scenario based on a 7.9 ppg
pore pressure, a minimum fracture gradient of 10.0 ppg at the 7" casing shoe, and 8.4
ppg mud in the hole.
S-24Ai Permit to Drill ,
Disposal:
No annular injection in this well.
Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-
2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all
cuttings from drilling operations to CC-2A for disposal, except any metal cuttings which
will be sent to the North Slope Borough.
SUMMARY SIDETRACK PROCEDURES
Pre-Rig Work:
The foflowing pre-rig work has already been completed (under approved Sundry #398-313). The work
was completed in early December of 1998, in preparation for this sidetrack, which was originally planed for
a mid December spud.
1. CTU performed a cement P&A across the existing perorations using 40 bbls of 15.8 ppg class 'G'
cement, of which 10 bbls contained 20 ppb aggregate. Cement was laid in across the perorations
and 12 bbls were squeezed behind pipe, using the hesitation method. (11-29-98)
2. Slickline tagged top of cement at 9016' MD and pressure tested the cement to 3000 psi for 30
minutes, with a 150 psi loss. (11-30-98)
3. E-line cut the 4 1/2" L-80 tubing at 4512' MD (22' down into a 40' joint). (11-30-98)
4. The well was displaced to clean seawater through the tubing cut and diesel was U-tubed in to freeze
protect to ~2000' MD. (12-1-98)
5. The 9-5/8" casing was tested against the cement plug to 3000 psi for 30 minutes, loosing 50 psi over
the 30 minute period. (12-2-98)
6. The McEvoy 9-5/8" mandrel packoff was tested to 5000 psi and bled down to 3500 psi in 30 minutes.
Nothing further was done, and plans were made to change out the pack-off as part of the sidetrack.
The tubing hanger seals were successfully tested to 5000 psi for 15 minutes. (12-2-98)
The foflowing pre-rig work will need to be completed prior to rig arrival
1. Bleed tubing and annuli pressures to zero. Set a BPV in the tubing hanger and test from below to
1000 psi. Secure well.
2. Remove the well house and flowlines. If necessary, level the pad. Please provide total well
preparation cost on the handover form.
Rig
1.
2.
3.
4.
5.
Operations:
MIRU Nabors 9ES
Pull BPV. Circulate out freeze protection and displace well to seawater. Set TVVC.
Nipple down tree. Nipple up and test BOPE. Pull TVVC.
Pull and lay down 4-1/2" tubing from E-line cut at 4512'.
MU 9-5/8" BP on 4" DP. RIH with BP and set at ~3030' MD. Release from BP and displace well to
9.6 ppg milling fluid. Spot 18.0 ppg pill from top of BP up to planned cut depth of 2830' MD. POOH.
6. MU Baker multi-string casing cutter to cut 9-5/8" casing. RIH and cut casing at 2830' MD. POOH.
7. Spear 9-5/8" casing and POOH with same.
8. RIH with cement stinger and spot cement kick-off plug from top of 9-5/8" casing stub, up into the 13-
3/8" casing shoe. Perform hesitation squeeze and POOH.
9. MU 9-7/8" drilling assembly and RIH to top of cement. Clean out cement to ~25' below 13-3/8" shoe.
Kick-off and drill the 9-7/8" intermediate section to logging point, just through the Kuparuk formation.
10. POOH and RU E-line. Log the Kuparuk formation with Platform Express / Sonic / RFT Logs.
11. RIH with 9-7/8" drilling assembly and drill ahead to Top Sag @ +10,045' MD (8670' TVD). POOH.
12. Run and cement the 7", 26# intermediate casing string, covering all shallow hydrocarbon bearing
zones. Hang 7" casing on slips at surface.
13. Make up and RIH with a 6" directional assembly to the landing collar.
14. Test the 7"4~-~6~ ~,nd 0-$-~" casing from the landing collar to surface to 3000 psi for 30 minutes.
S-24Ai Permit to Drill
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Drill the 6" production section building at 15.7°/100' to horizontal, targeting the Zone 4 sands. Drill
ahead to an estimated total depth of 13,041' MD (8911' TVD).
Run and cement a 4-1/2", 12.6# Bonzai production liner (solid liner cemented above ECP with slotted
liner below) throughout the 6" wellbore.
Test the 4-1/2", 7", and 9-5/8" casing from the 4-1/2" landing collar to surface to 4000 psi for 30
minutes. Displace well to clean seawater above liner top. POOH laying down DP.
Run a USIT / CBT on e-line to evaluate cement behind the 7" casing for AOGCC injection well
compliance. Log -,-1000' of 7" casing above the 4-1/2" liner top.
Run 4-1/2", 12.6# L-80 NSCT completion tying into the 4-1/2" liner top.
Freeze protect the well to ~2200'.
Set packer and test the tubing to 4000 psi for 30 minutes. Test the annulus to 4000 psi for 30 minutes
with 2000 psi on the tubing.
Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
Secure the well and rig down / move off.
The Bonzai liner cementing plugs will be drilled out with coiled tubing post rig release.
Estimated Pre-rig Start Date:
Estimated Spud Date:
07/21/99
08/01/99
William Isaacson
Operations Drilling Engineer
564-5521
TREE: 4" CIW
WELLHEAD: McEVOY
ACTUATOR: BAKER
S-24i Current Condition
KB. ELEV: 66.25'
BF. ELEV: 37.05'
4-1/2" HES X NIPPLE 3.813" ID
NO CONTROL LINES
2195'
13-3/8", 68#/ft, L-80 BTRS I 2669'
4-1/2", 12.6#/ft, L-80, TUBING
TUBING ID: 3.958"
CAPACITY: 0.0152 BBI_/FT
Tubing Jet Cut at 4512'
No Gas Lift Mandrels
Top of Cement Tagged at 9016'
pERFORATION SUMMARY
REF LOG: ATLAS- BHCA- 5-7-90
SIZE SPF INTERVAL OPEN/SQZ'D
3 3/8" 4 9834' - 9884'
ALL
5" 4 9991 - 10,040' SQUEEZED
S" 4 10,050- 10,086' DURING PRE-
S'' 4 10,099 - 10,132' RIG P&A.
PBTD 110,386'1
7", 26 #/ft, L-80, BUTT I 10,428' I
4-1/2" HES X NIPPLE 3.813" ID
9-5/8" TIW PACKER
(H BBP-T)(3.93" ID)
4-1/2" HES X NIPPLE 3.813" ID
9508'
9519'
9619'
9629'
9641'
9641 '
9945'
9953'
9957'
4-1/2" HES X NIPPLE 3.813" ID
4-1/2" WLEG
4-'1/2" ELMD
4-1/2" GUN RELEASE
( 5.218" OD) (3.94" ID)
9959'
9961'
NOTE: 3" FLOWLINE IN SKID
Portions of this wells flowline are 3" and
subject to erosion. The GC should be notified
of any well operations which could increase
the flow or erosion rates.
FISH: Tubing conveyed perforating assembly left in
well 5-24-90. Length is 171.75'. Top at 10,1 93' WLM.
DATE
7-7-99
REV. BY
WSI
COMMENTS
Current Well Status Followinq Sidetrack Pre-Riq
Work
PRUDHOE BAY UNIT
WELL: ~-24 (45-27-12-121
APl NO: 50-029-22044
~I::C 3~- TN 12 N- 12 RGE
BP EXPLORATION
TREE: 4-1/16" - 5M ClW L-80
WELLHEAD: 13 5~8" - 5M McEvoy SSH
13-3/8", 68 #/ft, L80, BTC I 2669' ~
S-24Ai Proposed Completion
4-1/2" 'X' Landing Nipple with 3.813" seal bore. 12200'1
Cellar Elevation: 35.43'
Base Flange: 37.05'
Nabors 9ES RKB = 65.43'
Cut and Pull 9-5/8" Casing
Top of casing stub at +~-2835' MD
Bridge Plug set at +/-3030' MD
4-1/2" 12.6# L-80, NSCT Tubing
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
7" x 4-1/2" Baker 'S-3' Production Packer
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
4-1/2" 'XN' Landing Nipple with 3.813" seal bore and 3.725" No-Go ID.
4-1/2" WireLine Entry Guide spaced-out into 4-1/2" liner tie-back sleeve.
+/-9895' J BAKER 5" x 7" Tie Back Sleeve
ZXP Liner Top Packer
'HMC' Hydraulic Liner Hanger
9-5/8", 47 #/ft, L80, NSCC
+/-10,045' J
7", 26 #/ft, L-80, BTC-Mod
I +/-12~540' I 4-1/2" 12.6 #/ft, L-80, BTC-Mod w/Baker CTC ECP
4-1/2" 12.6 #/ft, L-80, BTC-Mod Slotted Liner to I +/-13,040' I
7", 26 #/ft, L80, BUTT
Date Rev By Comments PRUDHOE BAY UNIT
7/17/99 WSI Proposed Completion WELL: S-24Ai
APl NO: 50-029-22044-01
Shared Services Drilling
Anadril 1 Schlumberger
Alaska District
39~0 Arctic Blvd.
Anc hora§e, AK g9503
(907) 273-1700 Fa~x 561-8557
DrRBCTIONAL WELL pTAN for S~L~RED SERVrCEs DRILLING
~el] ......... : S-24A (PllA)
Fie2d ........ : Prudhoe Bay
Computation..: Minimum Curvature
·
UniTs FEET
Surface Lat,.: 70.35360312 N
Surface Long,: 149.03194696 W
Legal
Surface ...... : 3646 FSL 4229
Tie-in survey: 3655 FSL 4~20
guparuk TGT.,: 647 FSL 860
Sag Tgt ...... : 1632 F$L 1567
Sad Tgt ...... : L771 F$L 1754
Faul~ Tc3t .... : 2004 FSL 2480
Target Point.: 21¢7 FSL 3~68
B~L .......... : 2486 FSL ~319
Description
F~L S35 T12N
S35 T12N
$2? T12N
F~L S27 TI2N
FEL S27 T12m
FEL S27 T12N
FEL $27 T~2N
LOCATIONS - ALASKA Zone:
K-Coord
R12E ~M
RI2E UM
R12E UM
Rt2E UM
RI2E UM
RL2E UM
RL2EUM
R12E UM
619213 O0
6L9222 35
617263 O0
6L65~0 O0
61655G O0
6~5620 O0
615~30 O0
613774.~0
4
Y-Coord
5979555~00
5979863.94
5982105.00
5983079.00
5983215.00
5983437.00
5983570,00
5983890,00
Prepared ..... : 15 JuL ]999
vert sect az.: 307.37
KB elevation.: 65.43 ft
Magnetic Dcln: +27,4SV (E}
Scale Factor.: ~,99991614
Convergence..: +~.91170814
FOR STUDY ONLY
PROPOSED WELL PROFILE
STATION
IDEI~TIFICATIO~
___
TIE-iN SURVEY
K0P CURVE 6/100
MEASIERED INCI/N DIRECTION VERTICAL-DEPTHS
DEPT7{ ~/gGLE AZIMUT~ TVD SUB-SEA
269?.28 L.53 3,42 2697.12 2631,69
2700.00 1.53 3,~S 2699.84 2634,4~
2800.00 7,15 326,98 2799.53 273~.5Q
2900,90 ~3.11 322,93 2897.92 2832.49
3000,00 19.10 321.39 2993.96 2928.53
SECT/ON
DEPAR~
-2.25
-2.~7
2L.25
48.07
COORDINATES-FROM ALASKA Zone 4
WELLHEAD X Y
8.79
15.42
29, '71
9.58 E 619229.35 5979863,94
9.50 E 619222.36 5979864.01
6.20 E 619218.95 5979870.52
4.05 W 619208.48 5979884.63
21.11 W 619191.0~ 59799~6.21
3100.0~ 25.09
3200.00 31,09
330~.00 37.08
320.56 3086 ,57 3021.1~
320.04 3174 ,75 31~9,32
319.$7 3257.53 3192 ,10
84.~2
130,$0
~85,~9
80.75
116.9~
159.76
44.81 9;
74.89 [~
619166,91 5979935.02
619136.37 5979970.73
619099.47 5980012,96
TOOL DL/
FACE
4R <TIE
331 8.¢5
91 6.00
51 ~ .00
31
31 6,00
21 6.00
21 6.00
(Anadrill {c)99 S24A@LL 3.2C 9:08 AR @)
S-24A (PllA) 15 Jul 1999 Page 2
PROPOSED WSLL PROFILE
STATIO~
IDENT[ F[CAT ION
END 6/100 CURVE
CURVE 5/[00
END 5/100 CURVE
MEASURED INCLN
DB PI~{ ANGLE
DIRECTION ¥ ERT[CAL-D~.PTRS
AZ 2MtrfR TVD SUB-SEA
3338.98 39.42 319.56 3288.14 3222.71
7527.40 39.42 319.56 6523.72 6458.29
7600.00 35.95 321.32 6581.17 6515.74
7700.00 31.23 324.29 6664.45 £599.02
7701,15 31.18 324.33 6665.43 6600.00
KUPARUK TGT
TOP KINGAK
PROP 7" CSG PT
TOP SAG RIVER
CURVE
7701,15 31.I8 324.33 6665.43 6600.00
8753.06 31.18 324.33 7565.43 7500.00
10044.55 31.18 324.33 8678.43 8605.00
10044.58 31,L8 324.33 8670.43 8605.00
100~4.58 31,~8 324,33 8687.54 8622,11
TARGET
TOP SADLEROCHIT
SECT]ON
DE PART
END SS.~/S00
CURVE 14/100
TARGET FAULT L
208.78
2808.57
2851.80
2905.13
2905.70
~o 14/loo CURVE
O3RVB 12/~00
TARGET POIt~T
END 12/100 CURV~
2905.70
3426.58
4~66.11
4066,[1
4076,01
TO
lOtOO.O0 35.54 318.03 8717.13 8651,70 i094,91
10200.00 49,01 305,92 879L.fl~ 872~.64 4~61.62
102J0.89 53.37 303,20 8810.43 89%5,00 4185,65
~8230.89 53.37 303.20 8810.43 87t5,00 4185,65
~8309.00 63.31 298.07 8846.$7 8781.24 4243,95
10i00.00 97.95 292.02 8879.77 BB[4.34 4335.77
10481.65 89.99 287.59 8888,34 88~2.91 4413.05
11125.42 89.99 2~7.59 8888,43 8825.00 5018.80
~1125,48 90.00 287.59 8888.~3 $823.00 5018.85
11200,00 80.16 284.1I 8894.82 8829.39 5087.83
112X?,16 77,90 283,29 8898.08 8632.65 5103.26
11640,40 77.90 283,29 8986.82 8921,39 5481.06
11700.00 85.05 283,29 8995.65 8930,22 5534.83
11741.25 90.00 283,29 8997.43 8932,0~ 5572.45
11777.52 93.89 285.23 8~96.20 8930.77 5605,77
13040,44 93.89 285.23 8910,43 B845.00 6?72.86
COORD1NATES-FRCaM AGASK3% Zone 4
WELLREAD X Y
%78.13 H 126.65 W 619083.55 5980031.08
2202.2~ N ]851.98 W 617326.31 5982027.34
2236.46 H 1880,27 W 617297.55 5982061.07
22~0.45 N 1913.77 W 617263.35 5982104.52
2280.94 N 1924,11 W 617263.00 5982105.00
TOOL DL/
FAC~ 100
=~= ===~
HS 6.00
163R
162R 5,00
160R 5.00
HS 5,O0
2280.94 N 1914,11
2723.29 N 2231.68
3266.40 N 2625.58
3266,40 N 2621.58
3274,81 N 2627.62
617263.00 5982105.00 HS 5,00
616935.46 5982542.21 MS 0,00
636540,00 5983099.00 aS 0.00
616540,00 5983079.00 HS
616533,83 598308~.31 4iL 0.00
3289,92 N 2639.86
3333.95 N 2690.18
3347.58 N 2710.00
3~47.58 N 2Vi0.00
3377.38 N 2760.60
616521,35 5983102.23
616490.35 5983145,44
616450,31 ~983158,76
g~6450.31 5983158,?6
616399.24 5983187.75
36L 15.90
271 15.70
251 15.70
251 15.70
221 15.70
3416.99 N 2845.89 W 616313.35 5983225,99 201 1S.V0
3444.~1 N 2922.13 W 61~236.68 5983252,19 HS 15.70
3639.01 N 3535 79 W 615620.05 5983436,98 KS 0,O0
3639.03 N 3535 85 W 615620.00 5983437.00 1615 14,00
3659,30 N 3607 16 W 615548.38 5983456.13 160G 14,00
3663,29 N 3623 53 W 655531.95 5983459.86
3758.40 N 4026 28 W 655127,77 5983548.55
3771,94 N 4063.61 W 615070,24 5983561.I7
3781.41 N 4123.71 W 615030,00 5983570.00
3790.34 N 4158.83 ~ 614994,74 5983578.37
14,00
0,00
12,00
26R 12.00
HS ~2.00
4121.39 N 5374.56 W 613774.00 5983890,~0
0.00
(Anadrill [c) 99 $24APll 3,2C 9:08 AM P)
FOR STUDY ONLY
SHARED SERVICES DRIELIN6
D
~ VERTICAL SECTION VIEW
,
...................... --T ................................... Sect ion at: 307.37
TVD ScBle,' ~ inch = 1200 feet
.... ,. ,~,,~%'I ~~ Dap Scale.' ~ inch = 1200 feet
I
' ~ AnadrJl] Schlumberger
I illm
, ~ ~r~r ~en~f~c~n HD ~K8 SE~T~ ~L~
~ ~] T~E-~ SURGE7 2Gg7 ~G~7 -~ ~.5~
~'- I C) E~D ~/100 CUR~E ~3~g 3~88 ~ ~.q~
................. D) ~URYE 5/~0~ 75~9 65~ ~8~g ~.~
~) ~D 1~/~0~ ~VA~E ~7 8898 5~03 77,~
I O) T~RGET POINT 1t741 8997 5572 90.00
I
P) END ~2/100 CURVE 11778 8998 5506 93.89
~ O) TD 13040 8910 6773 93.89
i ' ~ ~ ~l -~ "~"'~' ' '¢" ~'~
.--- . ....
- ~up~ ~~ [~ ~ ............................
gr -~- - ~ ..... -.'
; ~¢ 2¢t ~i~L .....
_ .......... ~ ............... z~,~ _~.. r~ ~P~ ~._
I I
.... , i i ....
I
I
I
I
.... , ........
I
..
0 600 J200 i800 2400 3000 3600 4200 4800 5400 6000 6500 7200 7800
Sect ion Bepactu__ce
_
SHARED SERVICES
Marker Identification MD
A) TIE-IN SURVEY 2597
8i KOP CURVE 6/100 2700
C) END 6/100 CURVE 3339
D} CURVE 5/100 7527
E} ENO 5/100 CURVE 7701
F) KUPARUK TGT 7701
G] PROP 7" CS6 PT 10045
HI CURVE 15,7/100 10065
I) TARGET t0231
d} END 15.7/100 10482
K) CURVE ~4/100 11~25
L) TARGET FAULT ~ 11125
M) END 14/100 CURVE 11217
N) CURVE J2/100 11640
O} TARGET POINT 1174~
P) END ~2/~00 CURVE ~778
N/S E/W
178 N 127
2202 N ~852 W
2281 N 1914 W
2281 N 1914 H
3266 N 2622
3275 N 2628
3348 N 2710
3444 N 2928
3639 N 3535
3639 N 3536
3663 N 3624
3758 N 4026
3781N 4~24
3790 N 415g
DRILLING
S-24A (Pi A)
PLAN VIEW
CLOSURE ..... : 6773 feet at Azimuth 307.48
DECLINATION.: +27.487 (E)
SCALE ....... : 1 1nub = ~000 feet
DRAWN ....... : 15 Jul 1999
Anad/'i ll Schlumberger
6500 6000 5§00 5000 4500 4000 ~500 3000 2500 2000 ~500 )OOO 500 0 500
<- ~£5T ' EAST ->
imm i iiii _ __
I ........................................................... " I'
:
I
, ..... ' ~ ~~rl~:et Point (Point)
i" ': '~'~.~~Jit Tot (Point>
~ _JSad Tgt
[ i ................................
re.d
.ry,.ce
r ll ng
WELL NAME
S-24Ai
DRILLING PERMIT/SUNDRY/PRE-RIG
COVER SHEET
The attached work cannot commence without obtaining the.required signatures in I
the "APPROVAL TO PROCEED" section at the bottom of this cover sheet.
"APPROVAL TO PROCEED" will signify AOGCC approval has been received.
This cover sheet is applicable to:
DRILLING PERMIT
r~ Permit Documentation Prepared:
ODE: 1~-~'~' ~ ~ .... Date:
DPermit Ap]~lication~ Reviewed:
SDE/ES:~ {~ Date:
Permit ~pplic~mnq~~ed:
TA: ~/~'/.~ .~ ~~.~ Date:'~/Jq/??
'only one category per cover sheet)
SUNDRY NOTICE
D Sundry Documentation Prepared: ·
ODE: Date:
I--I Sundry Application Reviewed:
SDE/ES' Date:
D Sundry Application Submitted:
TA: Date:
NOTE:
IF SUNDRY IS FOR PRE-RIG WORK, USE
PRE-RIG WORK SECTION AT BELOW LEFT
AND CHECK "ABANDON" BOX BELOW
PRE-RIG WORK
Reason for Sundry (Check all that apply)
Pre-Rig Memo Reviewed:
SDE/ES: Date:
Pre-Rig Memo Sent to Slope:
ODE: Date:
Pre-Rig Sundry Documentation Prepared:
ODE: Date:
Pre-Rig Sundry Application Reviewed:
SDE/ES: Date:
Pre-Rig Sundry Application Submitted:
Abandon
Alter Casing
Suspend
Repair Well
Plugging
Pull Tubing
Variance
Other(Explain):
Change Approved Program
Operation Shutdown
Re-enter Suspended Well
Time Extension
Perforate
Stimulate
TA: Date:
I APPROVAL TO PROCEED
Approved AOGCC Permit/Sundry Received TA: Date:
Approval to Commence Operations SDE/ES: Date:
TONY KNOWLE$, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Dcccmber 4, 1998
Dan Stone
Engineering Supcrvisor
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
Re;
Prudhoe Bay Unit S-24Ai
BP Exploration (Alaska), Inc.
Permit No: 98-245
Sur. Loc. 1633'SNL, 1050'EWL, SEC. 35, T12N, RI2E, UM
Btmhole Loc. 862'SNL. 3870'EWL. SEC. 27, T12N, R12E, UM
Dear Mr. Stone:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required bv lax,,' from
other governmental agencies, and does not authorize conducting drilling operations until all other
rcquired pcrmitting determinations are made.
Thc blowout prevention equipmcnt (BOPE) must be tcstcd in accordance with 20 AAC 25.035;
nd thc mcchanical integrity (MI) of the injection wells must be demonstrated under 20 AAC
25.412 and 20 AAC 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test
before operation, and of thc BOPE test performed before drilling below the surface casing shoe,
must be given so that a rcprescntative of the Commission may witness thc tests. Notice may be
given bv contacting thc Commission petroleum field inspector on the North Slope pager at
659-3607.
~Sinc //'
Robert N. Christcnson, P.E.
Commissioner
BY ORDER OF THE COMMISSION
dlf/Enclosure
ccz
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA,. _~¢L AND GAS CONSERVATION cor~. ,ISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[]Re-Entry I--IDeepenI []Service I--I Development Gas r-i Single Zone I--I Multiple Zone
21' Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan RKB = 63.43' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519~6612 ADL028258
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
1633' SNL, 1050' EWL, SEC. 35, T12N, R12E, UM Prudhoe Bay Unit
At top of productive interval "~. Well Number Number 2S100302630-277
3027' SNL, 2858' EWL, SEC. 27, T12N, R12E, UM S-24Ai
Attotal depth 9. Approximate spud date Amount $200,000.00
862' SNL, 3870' EWL, SEC. 27, T12N, R12E, UM 12/04/98
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL028256, 862'I No Close Approach 2560 13858' MD / 8993' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 3800' MD Maximum Hole Angle 102° Maximum surface 2325 psig, At total depth C'VD) 8750' / 3200 psig
18. Casing Program Setting Depth
Size Specifications Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
8-1/2" 7" 26# L-80 BTC-M 6817' 3650' 3625' 10467' 8668' 615 sx Class 'G'
6" ~-1/2" 12.6# L-80 IBT-M 3541' 10317' 8546' 13858' 8993 409 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations. ('~0V
Present well condition summary
Total depth: measured 10428 feet Plugs (measured) AJEtsk:Et 0iJ & Oas Oorl$. Coriiflliss[ort
true vertical 9311 feet
Effective depth: measured 10017 feet Junk (measured) Perf assem s. ,~ 10183' (05/92); Fill on top of fish @
true vertical 8961 feet 10112' (01/91)
Casing Length Size Cemented MD TVD
Structural BKB
Conductor 110' 20" 139' 139'
Surface 2639' 13-3/8" 2580 c.f. Arcticset II & III 2668' 2668'
Intermediate 9804' 9-5/8" 2040 c.f. Class 'G' 9843' 8816'
Production
Liner 838' 7" 258 c.f. Class 'G' 9590'-10428' 8610'-9311'
Perforation depth: measured 9991'-10040',10050'-10086',10099'-10132'
true vertical Subsea
8873'-8992' (three intervals)
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
C"ontact Engineer Name/Number: C. Michael Jackson, 564-5486 Prepared By Name/Number: Kathy Campoarnor, 564-5122
21.1Si.qnedhereby );~rtifyw..~,,.~that the_f~~~_~,~ is true and correct to the best of my knowledge
}~-2~a~tone- Title Engineering Supervisor Date
Commission Use Only
Permit Number I APl Number Approy¢~l I~3_ to. I See cover letter
,~<~'- .2. ,~"..,,4"' 50- O ~ ~ ,-- 2.. 2__. 4:~ ~ (--/' -' ~/) 1 ~- "~ "']k~' for other requirements
Conditions of Approval: Samples Required []Yes ~No Mud Log Required I--lYes [~No
Hydrogen Sulfide Measures ]~lYes [] No Directional Survey Required J~Yes [] No
Required Working Pressure for ROPE []2K; []3K; []4K; [~5K; [] 10K; [] 15K
Other:
ORIGINAL SIGNED'BY by order of ,/
Approved By Robert N. Chdstenson Commissioner the commission Date ]~,'--
Form 10-401 Rev. 12-01-85 Submit In Triplicate
I Well Name: I S-24Ai
Sidetrack Plan Summary
I Type of Redrill (producer or injector): I Injector
ISurface Location'
Target Location:
Bottom Hole Location:
1633 FNL 1050 FWL
3027 FNL 2858 FWL
S35 T12N R12E Umiat
S27 T12N R12E Umiat
862 FNL3870 FWL S27T12N R12E Umiat
I AFENumber: 14P1200
I Estimated Start Date:112/04/98
I~D: 1~3,~5~' I I TVD: I ~99~' I
I Rig: I Nabors7ES
I Operating days to complete: 130
I BE/USE= 137.05'1 IEEe'
163.43'
I Well Design (conventional, slimhole, etc.): I Extended Horizontal Sidetrack
I Objective: I
Development injection targeting Zone 4 sands.
Mud Program:
Intermediate ~ud Properties: LSND 8.5" hole section I
Density (ppg) Funnel vis Yield Point 10 sec gel 10 min gel pH Fluid Loss
10.5-11.0 45-50 12-15 4-8 8-12 9-10 6-9
Production Mud Properties: Quickdril-n 16" hole section
Density (ppg) Funnel vis LSRV LSR YP pH
8.6 - 8.8 45-65 >45,000 cP 10-20 8.5-9.0
Directional:
KOP: I 3800' MD
Maximum Hole Angle:
Close Approach Well:
102° @ 12,760'(8949' TVD)
None
Logging Program:
Intermediate
Production Hole(Horizontal)
Drilling:
Open Hole:
Cased Hole:
Drilling'
Open Hole:
MWD / GR
None
USIT / CBT
MWD / GR
Platform Express + Sonic
S-24Ai Permit to Drill
Formation Markers:
Formation Tops MD TVDss Comments
Base Permafrost 1880'
SV3 / T5 27OO'
SV1 / T3 3200'
UG4 / K15-C1 3800' 3550' Kickoff Point @ 3697' TVDss
UG1 / UgS 4653' 4300' Est. pore pressure 2124 psi(9.5 ppg EMW)
WS1 / West Sak 5597' 4990' Est. pore pressure 2465 psi(9.5 ppg EMW)
CM3 / K12 5880' 5200'
Kuparuk 7752' 6590' Est. pore pressure 3255 psi(9.5 ppg EMW)
LCU 7847' 6660'
Miluveach 7995' 6770'
Top Kingak(H) 9046' 7550'
TJF 9288' 7730'
TJE 9625' 7980'
TJ D 9813' 8120'
TJC 10,150' 8370'
TJB 10,366' 8530'
TJA 10,406' 8560'
Sag River 10,460' 8600'
Shublik 10,521' 8645'
Zone 4 10,712' 8750' Est. pore pressure 3200 psi(7.0 ppg EMW)
Zone 3 8925' Not Penetrated
Zone 2 9000' Not Penetrated
HOT 8990' Not Penetrated
OOWC 9025' Not Penetrated
Casin! i/Tubing Proqram:
Hole Csg/ Wt/Ft Grade Conn Length Top Btm
Size Tbg O.D. MD/I'VD MD/TVD
8.5" 7" 26# L-80 BTC-M 6817' 3650'/3625' 10,467'/8668'
6" 4 1/2" 12.6# L-80 IBT-M 3541' 10,317'/8546' 13,858'/8993'
Tubing 4 1/2" 12.6# L-80 NSCT 10,317' 0/0 10,317'/8546'
Cement Calculations:
Kickoff Plug I Cased / Open hole I
Basis: Based on 200' of 9-5/8" casing volume above the section, 50' of 12-1/4" milled
section and 100' of 9-5/8" casing below the section.
TOC' At ~3600' md(3580' TVD, 3513' TVDss)
T°talCementV°lume: I Tail 132bbl/180f¢/181sksofHalliburt°nPremium'G'at17ppgand0.99cf/sk.
Liner Size 17" Intermediate I
Basis: Lead' Based on 5667' open hole above tail with 100% excess and 150' liner lap.
Lead TOC' At top of liner -3650' md(3625' TVD, 3559' TVDss).
Tail' Based on 80' shoe track and 1000' of open hole with 30% excess.
Tail TOC' At 9467' md(7925' TVD, 7862' TVDss).
S-24Ai Permit to Drill
Total Cement Volume: Lead 260 bbl/ 1459 ft~ / 450 sk of Halliburton Premium
'G' at
11.0 ppg and 3.24 cf/sk.
Tail 34 bbl/190 ft~ / 165 sk of Halliburton Premium 'G' at
15.8 ppg and 1.15 cf/sk.
Liner Size 14 1/2" Production I
Basis: Tail: Based on 80' shoe track volume, 3398' of open hole with 50% excess, 150'
of 7"x 4.5" liner lap and 200' of 7"x 4" drill pipe annulus volume.
Tail TOC: At top of liner ~-10,317' md(8546' TVD, 8483' TVDss)
Total Cement Volume: I Tail 86 bbl/482 ft~ / 409 sk of acid resistant Halliburton
I
Premium 'G' at 15.8 ppg and 1.18 cf/sk.
Well Control:
Well control equipment consisting of 5000 psi working pressure pipe rams(2),
blind/shear rams, and annular preventer will be installed and is capable of handling
maximum potential surface pressures.
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
· Maximum anticipated BHP: 3200 psi @ 8750' TVDss - Zone 4
· Maximum surface pressure: 2325 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/E)
· Planned completion fluid: 8.5 ppg Seawater / 6.8 ppg Diesel
Drilling Hazards/Contingencies
DRILLING CLOSE APPROACH:
· None
INTERMEDIATE SECTION:
· The Kingak shale is considered mechanically unstable over 50° inclination. The
6660' intermediate section will be drilled at inclinations up to 42° with mud
asphalt products added for reduced shale reactivity.
· Gas cut mud has been observed in the Ugnu(3800' TVDss) and Kuparuk(6500'
TVDss) which will be controlled with appropriate mud weights. In addition, tight
hole conditions have been encountered in the Kingak shales at 7400' TVDss.
Mud weights as high as 11.0 ppg and the addition of shale stabilizers may be
required.
· The kick tolerance for the 8.5" open hole section would be 37 bbls assuming an
influx at the 10,460' TD. This is a worst case scenario based on a 9.0 ppg pore
pressure gradient and a fracture gradient of 11.0 ppg with a 11.0 ppg mud in the
hole.
S-24Ai Permit to Drill
PRODUCTION SECTION:
· Stuck pipe has not been recorded in the production interval but differential
sticking will be a problem if loss circulation is occurring.
· The kick tolerance for the 7" shoe would be an infinite influx(annular volume)
assuming an influx at the 13,858' TD. This is a worst case scenario based on a
7.2 ppg pore pressure and a minimum fracture gradient of 10.0 ppg with a 8.5
ppg mud in the hole.
Disposal
No annular injection in this well.
Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes
to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition,
haul all cuttings from drilling operations to CC-2A for disposal, except any metal
cuttings which will be sent to the North Slope Borough.
SUMMARY SIDETRACK PROCEDURES
Pre-Riq Work:
,
Perform a cement P&A of 15.8 ppg class 'G' cement with adequate cement volume to cover the 7"
liner from PBTD at 10,385' to a minimum of 100' above the top perforation at 9834' plus squeeze 5
bbls to the perforations. Estimated cement volume needed is 30 barrels. A full bore P&A is
recommended but is at the discretion of the Wells Group. There are no GLM's in the completion
string.
Note: Top of cement must be at a minimum of 9734' for AOGCC compliance. Top of cement may
extend into the tubing as long as it does not interfere with the tubing cutting operations.
2. Rig up slickline, tag and document top of cement.
3. Cut the 4 1/2" L-80 tubing in the middle of a full joint of tubing at 4500'. This cut will not be fished and
is at the discretion of the Wells Group as to chemical or jet cut.
4. Test the McEvoy 9-5/8" mandrel packoff and tubing hanger seals to 5000 psi for 30 minutes.
5. Test the casing against the cement plug to 3000 psi for 30 minutes. Freeze protect top 2200' MD with
diesel. Ensure the cut is successful and communication exists between casing/tubing to avoid tubing
collapse.
6. Bleed tubing and annuli pressures to zero. Set a BPV in the tubing hanger and test from below to
1000 psi. Secure well.
7. Remove the well house and flowlines. If necessary, level the pad. Please provide total well
preparation cost on the handover form.
Ri_q Operations:
1. MIRU Nabors 7ES
2. Circulate out freeze protection. Set TWC.
3. Nipple down tree. Nipple up and test BOPE.
4. Pull 4-1/2" tubing.
5. Make up an 8.5" bridge plug on drill pipe and set at 4100'.
S-24Ai Permit to Drill
,
7.
8.
9.
10.
11.
12.
13.
14.
15.
Weight test the bridge plug and pressure test the casing to 4000 psi for 30 minutes(injection well).
Displace the well to milling fluid and spot a 18 ppg pill from the bridge plug to the milled section.
RIH with 9-5/8" Baker section mill assembly and mill a 50' window from 3800' to 3850'.
RIH with a mule shoe to 100' below the base of the section and spot a 17 ppg balanced cement plug
from 100' below the section to 200' above the section.
Kick-off drilling the 8-1/2" intermediate section to TSag @ +10,460' md(8663' TVD).
Run and cement a 7", 26# intermediate liner with a minimum of 150' liner lap in the 9-5/8".
Test the 7" and the 9-5/8" casing from the 7" landing collar to surface to 4000 psi for 30 minutes.
Drill the 6" production section building to horizontal targeting the Zone 4 sands(8813' TVD) to an
estimated depth of 1,858' md(8993' TVD).
Run DPC 'Platform Express' + Sonic logs from horizontal to 7" shoe.
Run and fully cement a 4-1/2", 12.6# production liner with a minimum of 150' liner lap in the 7".
1 6. Run a USlT / CBT on e-line as deep as possible logging the 4.5" and 7" cement bond for 1000' above
the top of the 4.5" liner.
17. Test the 4-1/2", 7" and 9-5/8" casing from the 4-1/2" landing collar to surface to 4000 psi for 30
18.
19.
20.
21.
22.
23.
minutes.
The 4-1/2" production liner will be perforated with DPC 2.75" guns on a 400 psi under balance.
Perforating intervals to be determined after reviewing logs.
Run 4-1/2" NSCT L-80 completion tying into the 4-1/2" liner,
Test the tubing to 4000 psi and annulus to 4000 psi for 30 minutes with 2500 psi on the tubing.
Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
Freeze protect the well to -2200' and secure the well.
Rig down and move off.
Estimated Pre-rig Start Date:
Estimated Spud Date:
11/27/98
12/04/98
C. Michael Jackson
564-5486
1 1/19/98
S-24Ai Permit to Drill
Shared Services Drilling
Well: S-24A Wp4
I DrillQuest'
T,~v~ .~,~:PROPOSAL TARGET SUMMARY
'I'VDSS ~XFDRKB: Weilhoad O$1sols: G~:~al C.:~:~:~natos:
S~ Tt ~25.~~.~ ~42.~ N, ~1.~ W 59~.~ N, 61~.~ E
S~ ~.~ ~.~ ~.81N. ~76.61W ~.~ N, 61~75.~ E
I ~ TM ~5.~ ~.~ ~13.~ N. ~.01 W ~15.~ N. 615~.~ E
T4 ~.~ ~.~ ~25 N, 3117.~ W ~.~ N, 61~15.~ E
S-2~ T5 ~5,~ ~.~ ~.~ N, 2~5.~ W ~.~ N, 6~.~ E
~ T6 ~.~ ~.~ ~.~ N. 2467,~ W ~.~ N, 61~.~ E
............. UGI/UgS: 456J.45 TVD
Proposal Data for S-24A Wp4
Vertical Origin:Well
Horizontal Origin: Well
Measurement~lnits: ft
North Reference:True North
Dogleg severity · Degrees I~r 100fi
Vertical Section ~,zimuth: 336.039°
Vertical Section Description:Well
Vertical Section Origin: 0.00 N,0.00 E
PRELIMINARY
FOR PERMITtiNG ONLY
Measured Incl. Azim. Vertical Northings Eastings VorticalDogleg
Depth Depth Section Rate
3800.0027.53444.290 3761.19 217.07 N 125.16 E 147.53
4400.0058.089345.000 4212.50 584.04 N 158.03 E 469.53 8.000
4930.3442.074308.514 4558.43 920.82 N 44.49 W 859.54 6.000
10494.32 42.074308.514 8688.43 3242.54 N 2961.78 W4165.930.000
10751.28 72.081317.211 8826.68 3389.43 N 3115.93 W4362.7612.0O0
11090.72 72.081317.211 8931.12 3626.45 N 3335.33 W4668.450.000
11392.85 95.795345.000 8963.43 3885.81 N 3476.61 W4962.8412.000
11617.26 98.37512.018 8935.24 4106.29 N 3482.50 W5166.7112.000
11936.41 98.37512.018 8888.75 4415.11 N 3416.75 W5422.220.0gO
12147.28 81.80025.100 8888.43 4613.89 N 3350.01 W5576.7610.0O0
12208.39 75.71525.667 8900.34 4668.01 N 3324.33 W5615.7910.0O0
12402.24 75.71525.667 8948.17 4837.33 Iq '~ 3242.96 W5737.480.0O0
12682.30 98.00028.000 8963.43 5085.25 N 3117.48 W5913.078,000
12760.55 102.893 31.972 8949.24 5151.88 N 3079.06 W5958.358.000
12872.85 102.893 31.972 8924.18 5244.74 N 3021.10 W6019.670.0(~)
13216.14 82.39434.000 8908.43 5530.82 N 2835.35 W6205.666.000
13238.86 82.39435.375 8911.44 5549.33 N 2822,54 W6217.376.000
13858.37 82.39435.375 8993.43 6050.02 N 2467.05 W6530.550.000
SURFACE LOCATION
Horizontal Coordinates: 28,00 ft Rig (EST) J
RKB Elevation: 5979855.00 N, 619213.00 E63.43 ft35'43 ft WeIIRKB - AMSL j(CBE) JJ
Coordinate System: NAD27 Alaska State Planes,
Zone 4, US Foot
PLOT DATE: 19-NOV-98
Created By: '~'
Checked By:
0
~ 90
450 1350
Scale: linch = 900ft
I
2250
3150
Top IGngaklTJH/I'JG: ~615.45 FVD
S.24A T2
...... ';{,¢,.t';;'E~.~',:.,~,' ~ ............ ';.;;.;;:; .................................................................
S.24A TS $08,f.25 N, 3117.48 W $.24A T6
88~8.45 TVD 8993.43 TVD
4613.89 N, 33S0.01 W S.24A T5 6050.02 N, 2467.05 W
4050 4950
Vertical Section
'~'~e~lit/TZ4: 8815.45 TVD
oowc: 908& 45 TVD
I
5850 6750 7650
Section Azimuth: 336.039° (True Nort
O R I I,. I,. I N ~
Shared Services Drilling
Well: S-24A Wp4
SURFACE LOCATION
Horizonlal Coordinates: 5979855.00 N, 619213.00 E
Rig (EST)
RKB ElavaEon: 63.43 ft 28.00 fl35.43 ff
Coordinate System: NAD27 Aie. ska State planes,
Zone 4, US Foot
PLOT DATE: 19-NOV-98
Created By: -- ~--
Checked By:
PROPOSAL TARGET SUMMARY
Target Name: 'I'VDSS TVDRKB: Wellhead Offsets:Global Coordinates:
S-24A T1 8625,00 8688.43 3242.54 N, 2961.78 W 5983050.00 N, 616200.00 E
S-24A T2 8900.00 8963.43 3885.81 N, 3476.61 W 5983685.00 N, 615675.00 E
S-24A T3 ~' 8825.00 8888.43 4613.89 N, 3350.01 W 5984415,00 N, 615790.00 E
S-24A T4 8900.00 8963.43 5085.25 N, 3117.48 W 59~4890.00 N, 616015.00 E
S-24A T5 8845.00 8908.43 5530.82 N, 2835.35 W 5985340.00 N, 616290.00 E
S-24A T6 8930,00 8993.43 6050.02 N, 2467.05 W 5985865.00 N, 616650.00 E
-3600 -2700 -1800 -900 0
I I I I
9938S4 1/2' Liner
13.858.37 MD
S.24A T5
- //y ..... ,. ....... _
,° .... ' ...... FOR PE~I~ING ONL~
89~.4J
~ ~3~.81 N, 476.61 W ~.~
4~
5400--
4500--
3600-
2700--
180
900--
.-3600 -2700 -1800 -900 0
Scale: linch = 900ft Eastings
J DrillQuest'
54OO
45O0
3600
2700
1800
900
Reference is True North
Prudhoe Bay Unit
Sperry-Sun Drilling Services
Proposal Report for S-24A Wp4
Measured Sub-Sea Vedical Local Coordinates Global Coordinates Dogleg Ve~ical
Depth Incl. Azim. Depth Depth Nothings Eastings Nothings Eastings Rate Section Comment
(fi) (fi) (fi) (fi) (fi) (fi) (fi) (~100ff) (fi)
3800.00 27.534 44.290 3697.76 3761.19 217.07 N 125.16 E 5980074.03N 619334.69E 147.53
3900.00 30.005 28.428 3785.54 3848.97 255.67 N 153.25E 5980113.07N 619362.16E 8.000 171.40
4000.00 34,068 15.393 3870.39 3933.82 304.74 N 172.62 E 5980162.45 N 619380.74 E 8.000 208.37
4100.00 39.228 5.119 3950.67 4014.10 363.33 N 182.89 E 5980221.20 N 619390.08 E 8.000 257.75
4200.00 45.104 357.011 4024.82 4088.25 430.31 N 183.86 E 5980288.18 N 619389.99 E 8,000 318.55
4300.00 51.444 350.462 4091.38 4154.81 504.36 N 175.52 E 5980362.09 N 619380.48 E 8.000 389~61
4400.00 58.089 345,000 4149.07 4212.50 584.04 N 158.03 E 5980441.48 N 619361.72 E 8.000 469.53
4500.00 54.281 339.417 4204.74 4268.17 663.12 N 132.75 E 5980520.15 N 619335.18 E 6,000 552.06
4600.00 50.756 333,295 4265.61 4329.04 735.78 N 101.05 E 5980592.29 N 619302.33 E 6.000 631.33
4653.36 49.014 329.781 4300.00 4363.43 771.65 N 81.62 E 5980627.85 N 619282.33 E 6.000 672.00 UG1/UgS
4700.00 47.583 326.560 4331.03 4394.46 801.23 N 63.27 E 5980657.14 N 619263.51 E 6.000 706.49
4800.00 44.845 319.159 4400.27 4463.70 858.76 N 19.83 E 5980713.97 N 619219.16 E 6.000 776.70
4900.00 42.630 311.088 4472.58 4536.01 907.74 N 28.79W 5980762.16 N 619169.77 E 6.000 841.20
4930.34 42.074 308.514 4495.00 4558.43 920.82 N 44.49W 5980775.00 N 619153.86 E 6,000 859.54
5000.00 42.074 308.514 4546.71 4610.14 949.89 N 81.02W .5980803.48 N 619116.88 E 0.000 900.93
5100.00 42.074 308.514 4620.93 4684.36 991.62 N 133.45W 5980844.37 N 619063.79 E 0.000 960.36
5200.00 42.074 308.514 4695,16 4758.59 1033.34 N 185.88W 5980885.26 N 619010.70 E 0.000 1019,78
5300.00 42,074 308,514 4769.39 4832.82 1075.07 N 238.31W 5980926.14 N 618957.61 E 0.000 1079.21
5400.00 42,074 308.514 4843.62 4907.05 1116.80 N 290.74W 5980967.03 N 618904.52 E 0.000 1138.63
5500.00 42,074 308.514 4917.84 4981.27 1158.53 N 343.17W 5981007.92 N 618851.43 E 0.000 1198.06
5597.21 42.074 308.514 4990,00 5053.43 1199.09 N 394.14W 5981047.67 N 618799.83 E 0.000 1255.82 WS1/West Sak
5600.00 42.074 308.514 4992.07 5055.50 1200.25 N 395.61W 5981048.81 N 618798.35 E 0.000 1257.48
5700.00 42,074 308.514 5066.30 5129.73 1241.98 N 448.04W 5981089.70 N 618745.26 E 0.000 1316.91
5800.00 42.074 308.514 5140,53 5203.96 1283.71N 500.47W 5981130.58 N 618692.17 E 0,000 1376.33
5880.12 42.074 308.514 5200.00 5263.43 1317,14 N 542.48W 5981163.34 N 618649.63 E 0.000 1423.94 CM3/K-12
Alaska State Plane Zone 4
PBU_WOA S Pad
Continued...
18 November, 1998- 15:04 - 1 - DrillQuest
Prudhoe Bay Unit
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(~) (~) (~)
5900.00 42.074 308.514 5214.75 5278.18
6000.00 42.074 308.514 5288.98 5352.41
6100.00 42.074 308.514 5363.21 5426.64
6200.00 42.074 308.514 5437.44 5500.87
6300.00 42.074 308.514 5511.66 5575.09
6400.00 42.074 308.514 5585.89 5649.32
6500.00 42.074 308.514 5660.12 5723.55
6600.00 42.074 308.514 5734.35 5797.78
6700.00 42.074 308.514 5808.57 5872.00
6800.00 42.074 308.514 5882.80 5946.23
6900.00 42.074 308.514 5957.03 6020.46
7000.00 42.074 308.514 6031.26 6094.69
7100.00 42.074 308.514 6105.48 6168.91
7200.00 42.074 308.514 6179.71 6243.14
7300.00 42.074 308.514 6253.94 6317.37
7400.00 42.074 308.514 6328.17 6391.60
7500.00 42.074 308.514 6402.39 6465.82
7600.00 42.074 308.514 6476.62 6540.05
7700.00 42.074 308.514 6550.85 6614.28
7752.75 42.074 308.514 6590.00 6653.43
7800.00 42.074 308.514 6625.08 6688.51
7847.05 42.074 308.514 6660.00 6723.43
7900.00 42.074 308.514 6699.30 6762.73
7995.24 42.074 308.514 6770.00 6833.43
8000.00 42.074 308.514 6773.53 6836.96
8100.00 42.074 308.514 6847.76 6911.19
8200.00 42.074 308.514 6921.99 6985.42
8300.00 42.074 308.514 6996.21 7059.64
8400.00 42.074 308.514 7070.44 7133.87
8500.00 42.074 308.514 7144.67 7208.10
Sperry-Sun Drilling Services
Proposal Report for S-24A Wp4
r'-r'.~,~T. ?'~
Local Coordinates
Global Coordinates
Nodhings Eastings Northings Eastings
(~) (~) (~) (~)
1325.44N 552.90W 5981171.47 N 618639.08 E
1367.16 N 605.33W 5981212.36 N 618585.99 E
1408.89 N 657.77W 5981253.25 N 618532.90 E
1450.62 N 710.20W 5981294.14 N 618479.81E
1492.35 N 762.63W 5981335.02 N 618426.72 E
1534.08 N 815.06W 5981375.91N 618373.63 E
1575.80 N 867.49W 5981416.80 N 618320.54 E
1617.53 N 919.92W 5981457.69 N 618267.46 E
1659.26 N 972.36W 5981498.58 N 618214.37 E
1700.99 N 1024.79W 5981539.46 N 618161.28 E
1742.71N 1077.22W 5981580.35 N 618108.19 E
1784.44 N 1129.65W 5981621.24 N 618055.10 E
1826.17 N 1182.08W 5981662.13 N 618002.01 E
1867.90 N 1234.51W 5981703.02 N 617948.92 E
1909.62 N 1286.95W 5981743.90 N 617895.83 E
1951.35 N 1339.38W 5981784.79 N 617842.74 E
1993.08 N 1391.81W 5981825.68 N 617789.65 E
2034.81N 1444.24W 5981866.57 N 617736.56 E
2076.53 N 1496.67W 5981907.46 N 617683.48 E
2098.54 N 1524.33W 5981929.02 N 617655.47 E
2118.26 N 1549.10W 5981948.35 N 617630.39 E
2137.90 N 1573.77W 5981967.58 N 617605.41 E
2159.99 N 1601.54W 5981989.23 N 617577.30 E
2199.73 N 1651.47W 5982028.18 N 617526.73 E
2201.72 N 1653.97W 5982030.12 N 617524.21 E
2243.45 N 1706.40W 5982071.01 N 617471.12 E
2285.17 N 1758.83W 5982111.90 N 617418.03 E
2326.90 N 1811.26W 5982152.79 N 617364.94 E
2368.63 N 1863.69W 5982193.67 N 617311.85 E
2410,36 N 1916.13W 5982234.56 N 617258.76 E
Dogleg Vertical
Rate Section
(o/~ 00ft) (ft)
0.000 1435.76
0.000 1495.18
0.000 1554.61
0.000 1614.03
0.000 1673.46
0.000 1732.88
0.000 1792.30
0.000 1851.73
0.000 1911.15
0.000 1970.58
0.000 2030.00
0.000 2089.43
0.000 2148.85
0.000 2208.28
0.000 2267.70
0.000 2327.13
0.000 2386.55
0.000 2445.98
0.000 2505.40
0.000 2536.75
0.000 2564.83
0.000 2592.79
0.000 2624.25
0.000 2680.85
0.000 2683.68
0.000 2743.10
0.000 2802.53
0.000 2861.95
0.000 2921.38
0.000 2980.80
Comment
Kuparuk
LCU
Miluveach
Alaska State Plane Zone 4
PBU_WOA S Pad
Continued...
18 November, 1998 - 15:04
-2-
DrillQuest
Prudhoe Bay Unit
Measured Sub-Sea Ve~ical
Depth Incl, Azim, Depth Depth
(") (") (")
8600.00 42.074 308.514 7218.90 7282.33
8700.00 42.074 308.514 7293.12 7356.55
8800.00 42.074 308.514 7367.35 7430.78
8900.00 42.074 308.514 7441.58 7505.01
9000.00 42.074 308.514 7515.81 7579.24
9046.07 42.074 308.514 7550.00 7613.43
9100.00 42.074 308.514 7590.03 7653.46
9200.00 42.074 308.514 7664.26 7727.69
9288.56 42.074 308.514 7730.00 7793.43
9300.00 42.074 308.514 7738.49 7801.92
9400.00 42.074 308.514 7812.72 7876.15
9500.00 42.074 308.514 7886.94 7950.37
9600.00 42.074 308.514 7961.17 8024.60
9625.37 42.074 308.514 7980.00 8043.43
9700.00 42.074 308.514 8035.40 8098.83
9800.00 42.074 308.514 8109.63 8173.06
9813.98 42.074 308.514 8120.00 8183.43
9900.00 42,074 308,514 8183.85 8247.28
10000.00 42.074 308.514 8258.08 8321.51
10100.00 42.074 308.514 8332.31 8395,74
10150.78 42,074 308.514 8370.00 8433.43
10200.00 42.074 308.514 8406.54 8469.97
10300.00 42.074 308.514 8480.76 8544.19
10366.33 42.074 308.514 8530.00 8593.43
10400.00 42.074 308.514 8554.99 8618.42
10406.75 42.074 308.514 8560.00 8623.43
10460.64 42.074 308.514 8600.00 8663.43
10467.37 42.074 308.514 8605.00 8668.43
10494.32 42.074 308.514 8625.00 8688.43
10500.00 42.729 308.797 8629.20 8692.63
Sperry-Sun Drilling Services
Proposal Report for S-24A Wp4
Local Coordinates
Global Coordinates
Nothings Eastings Nodhings Eastings
(") (~) (~) (")
2452.08 N 1968.56W 5982275.45 N 617205.67 E
2493.81N 2020.99W 5982316.34 N 617152.59 E
2535.54 N 2073.42W 5982357.23 N 617099.50 E
2577.27 N 2125.85W 5982398.11N 617046.41E
2618.99 N 2178.28W 5982439.00 N 616993.32 E
2638.22 N 2202.44W 5982457.84 N 616968.86 E
2660.72 N 2230.72W 5982479.89 N 616940.23 E
2702.45 N 2283.15W 5982520.78 N 616887.14 E
2739.41 N 2329.58W 5982556.99 N 616840.12 E
2744.18 N 2335.58W 5982561.67 N 616834.05 E
2785.90 N 2388.01W 5982602.55 N 616780.96 E
2827.63 N 2440.44W 5982643.44 N 616727.87 E
2869.36 N 2492.88W 5982684.33 N 616674.78 E
2879.94 N 2506.18W 5982694.70 N 616661.32 E
2911.09 N 2545.31W 5982725.22 N 616621.70 E
2952.82 N 2597.74W 5982766.11 N 616568.61 E
2958.65 N 2605.07W 5982771.82 N 616561.19 E
2994.54 N 2650.17W 5982807.00 N 616515.52 E
3036.27 N 2702.60W 5982847.88 N 616462.43 E
3078.00 N 2755.03W 5982888.77 N 616409.34 E
3099.19 N 2781.66W 5982909.53 N 616382.38 E
3119.73 N 2807.47W 5982929.66 N 616356.25 E
3161.45 N 2859.90W 5982970.55 N 616303.16 E
3189.13 N 2894.68W 5982997.67 N 616267.95 E
3203.18 N 2912.33W 5983011.44 N 616250.07 E
3206.00 N 2915.87W 5983014.19 N 616246.49 E
3228.48 N 2944.12W 5983036.23 N 616217.88 E
3231.29 N 2947.65W 5983038.98 N 616214.30 E
3242.54 N 2961.78W 5983050.00 N 616200.00 E
3244.93 N 2964.77W 5983052.35 N 616196.97 E
Dogleg Ve~ical
Rate Section
(°/~00,) (.)
0.000 3040.23
0.000 3099.65
0.000 3159.08
0.000 3218.50
0.000 3277.93
0.000 3305.30
0.000 3337.35
0.000 3396.78
0.000 3449.41
0.000 3456.20
0.000 3515.63
0.000 3575.05
0.000 3634.48
0.000 3649.55
0.000 3693.90
0.000 3753.33
0.000 3761.63
0.000 3812.75
0.000 3872.18
0.000 3931.60
0.000 3961.78
0.000 3991.03
0,000 4050.45
0.000 4089.87
0.000 4109.88
0.000 4113.89
0,000 4145.91
0.000 4149.91
0.000 4165.93
12.000 4169.33
Comment
Top Kingak/TJI-VTJG
TJF
TJE
TJD
TJC
TJB
TJA
Sag River
7" Liner
Target: S-24A T1, Geological
Alaska State Plane Zone 4
PBU_WOA S Pad
Continued...
18 November, 1998- 15:04
-3-
DrillQuest
Prudhoe Bay Unit
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(~) (~) (~)
10521.97 45.267 309.825 8645.00 8708.43
10600.00 54.340 312,864 8695.32 8758.75
10700.00 66.053 315.882 8744.94 8808.37
10712.85 67,563 316,226 8750.00 8813.43
10751.28 72.081 317.211 8763.25 8826.68
10800.00 72,081 317.211 8778.24 8841.67
10900.00 72.081 317.211 8809.01 8872.44
11000.00 72.081 317.211 8839.78 8903.21
11090.72 72.081 317.211 8867.69 8931.12
11100.00 72.774 318.125 8870.49 8933.92
11200.00 80.460 327.606 8893.67 8957.10
11300.00 88.391 336.662 8903.39 8966.82
11392.85 95.795 345.000 8900.00 8963.43
11400.00 95.900 345,856 8899.27 8962.70
11500.00 97.225 357.862 8887.80 8951.23
11600.00 98.236 9.930 8874.30 8937.73
11617.26 98.375 12.018 8871.81 8935.24
11700.00 98.375 12.018 8859.76 8923.19
11800.00 98.375 12.018 8845.19 8908.62
11900.00 98.375 12.018 8830.63 8894.06
11936.41 98.375 12.018 8825.32 8888.75
12000.00 93.383 15,980 8818.81 8882.24
12100.00 85.510 22.150 8819.77 8883.20
12147.28 81.800 25.100 8825.00 8888.43
12200.00 76.550 25.588 8834.90 8898.33
12208.39 75.715 25.667 8836.91 8900.34
12300.00 75.715 25.667 8859.51 8922.94
12400.00 75,715 25.667 8884.19 8947.62
12402.24 75.715 25.667 8884.74 8948.17
12500.00 83.493 26.497 8902.37 8965.80
Sperry-Sun Drilling Services
Proposal Report for S-24A Wp4
Local Coordinates
Northings Eastings
(ft) (ft)
Global Coordinates Dogleg
Northings Eastings Rate
(fi) (fi) (°/100fi)
Vertical
Section Comment
(ft)
3254.60 N 2976.58W
3294.00 N 3021.20W
3354.67 N 3083.01W
3363.17 N 3091.21W
3389.43 N 3115.93W
3423.44 N 3147.42W
3493.27 N 3212.05W
3563.10 N 3276.69W
3626.45 N 3335.33W
3632.98 N 3341.28W
3710.46 N 3399.79W
3798.31 N 3446.18W
3885.81N 3476.61W
3892.70 N 3478.40W
3990.85 N 3492.46W
4089.52 N 3485.75W
4106.29 N 3482,50W
4186.35 N 3465.45W
4283.12 N 3444.85W
4379.88 N 3424.25W
4415.11N 3416.75W
4476.46 N 3401.45W
4570.85 N 3368.83W
4613.89 N 3350.01W
4660.67 N 3327.85W
4668.01 N 3324.33W
4748.03 N 3285.88W
4835.38 N 3243.90W
4837.33 N 3242.96W
4923.63 N 3200.71W
5983061.83 N 616185.01 E 12.000 4182.96
5983100.51N 616139.77 E 12.000 4237.09
5983160.19 N 616077.00 E 12,000 4317.62
5983168.56 N 616068.67 E 12,000 4328.72
5983194.42 N 616043.53 E 12.000 4362.76
5983227.93 N 616011.51E 0.000 4406.63
5983296.72 N 615945.77 E 0.000 4496.69
5983365.51N 615880.03 E 0.000 4586.75
5983427.92 N 615820.39 E 0.000 4668.45
5983434.36 N 615814.33 E 12.000 4676.85
5983510.90 N 615754.60 E 12.000 4771.41
5983598.00 N 615706.82 E,, 12,000 4870.52
5983685.00 N 615675.00E/" 12.000 4962.84
5983691.86 N 615673.10 E 12.000 4969.86
5983789.77 N 615657.49 E 12.000 5065.26
5983888.54 N 615662.62 E 12.000 5152.71
5983905.36 N 615665.61 E 12,000 5166.71
5983985.68 N 615681.37 E 0.000 5232.95
5984082.76 N 615700.43 E 0.000 5313.01
5984179.84 N 615719.49 E 0.000 5393.07
5984215.19 N 615726.43 E 0.000 5422.22
5984276.77 N 615740.75 E 10,000 5472.06
5984371.67 N 615771.87 E 10.000 5545.07
5984415.00 N 615790.00 E 10.000 5576.76
5984462.13 N 615811.41 E 10.000 5610.52
5984469.53 N 615814.81 E 10,000 5615.79
5984550.15 N 615851.99 E 0.000 5673.30
5984638.15 N 615892.57 E 0.000 5736.07
5984640.12 N 615893.48 E 0,000 5737.48
5984727.08 N 615934.35 E 8.000 5799.18
Shublik
Top Sadlerochtt/TZ~,
Target: $-24A T2, Geological
Target: S-24A T3, Geological
Alaska State Plane Zone 4
PBU_WOA S Pad
Continued...
18 November, 1998- 15:04
-4.
DrillQuest
Sperry-Sun Drilling Services
Proposal Report for S-24A Wp4
Prudhoe Bay Unit
Measured Sub-Sea Ve~ical Local Coordinates
Depth Incl. Azim. Depth Depth Nothings Eastings
(~) (~) (~) (~) (~)
12600.00 91.451 27.320 8906.78 8970.21 5012.64 N 3155.53W
12682.30 98.000 28.000 8900.00 8963.43 5085.25 N 3117.48W
12700.00 99.111 28.888 8897.37 8960.80 5100.64 N 3109.14W
12760.55 102.893 31.972 8885.81 8949.24 5151.88 N 3079.06W
12800.00 102.893 31.972 8877.01 8940.44 5184.50 N 3058.70W
12872.85 102.893 31.972 8860.75 8924.18 5244.74 N 3021.10W
12900.00 101.272 32.137 8855.07 8918.50 5267.24 N 3007.00W
13000.00 95.301 32.734 8840.66 8904.09 5350.72 N 2953.95W
13100.00 89.330 33.318 8836.62 8900.05 5434.45 N 2899.52W
13200.00 83.358 33.904 8843.00 8906.43 5517.53 N 2844.30W
13216.14 82.394 34.000 8845.00 8908.43 5530.82 N 2835.35W
13238.86 82.394 35.375 8848.01 8911.44 5549.33 N 2822.54W
13300.00 82.394 35.375 8856.10 8919.53 5598.74 N 2787.46W
13400.00 82.394 35.375 8869.33 8932.76 5679.56 N 2730.07W
13500.00 82.394 35.375 8882.57 8946.00 5760.39 N 2672.69W
13600.00 82.394 35.375 8895.80 8959.23 5841.21 N 2615.31W
13700.00 82.394 35.375 8909.04 8972.47 5922.03 N 2557.92W
13800.00 82.394 35.375 8922.27 8985.70 6002.85 N 2500.54W
13820.59 82.394 35.375 8925.00 8988.43 6019.49 N 2488.72W
13858.37 82.394 35.375 8930.00 8993.43 6050.02 N 2467.05W
Global Coordinates Dogleg
Nothings Eastings Rate
(fl) (fl) (°/lOOff)
5984816.80 N 615978.11E 8.000
5984890.00 N 616015.00 E 8.000
5984905.52 N 616023.09 E 8.000
5984957.23 N 616052.36 E 8.000
5984990.17 N 616072.20 E 0.000
5985051.00 N 616108.83 E 0.000
5985073.73 N 616122.57 E 6.000
5985158.04 N 616174.28 E 6.000
5985242.63 N 616227.38 E 6.000
5985326.57 N 616281.27 E 6.000
5985340.00 N 616290.00 E 6.000
5985358.71N 616302.52 E 6.000
5985408.68 N 616336.81 E 0.000
5985490.41N 616392.90 E 0.000
5985572.13 N 616448.99 E 0.000
5985653.85 N 616505.08 E 0.000
5985735.58 N 616561.17 E 0.000
5985817.30 N 616617.26 E 0.000
5985834.13 N 616628.81E 0.000
5985865.00 N 616650.00 E/' 0.000
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Vedical
Section Comment
(fi)
5862.17
5913.07 Target:S-24A T4, Geological
5923.74
5958.35
5979.89
6019.67
6034.51
6089.25
6143.66
6197.15
6205.66 Target:S-24A T5, Geological
6217.37
6248.28
6298.83
6349.39
6399.94
6450.49
6501.04
6511.45 TZ3
6530.55 4 1/2" Liner
Target:S-24A T6, Geological
Alaska State Plane Zone 4
PBU_WOA S Pad
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well and calculated along an Azimuth of 336.039° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 13858.37ft.,
The Bottom Hole Displacement is 6533.69ft., in the Direction of 337.816° (True).
Continued...
18 November, 1998- 15:04
-5-
DrillQuest
Prudhoe Bay Unit
Formation Tops
Measured Ve~ical Sub-Sea
Depth Depth Depth Nothings
(~) (~) (~) (~)
4653.36 4363.43 4300.00 771.65 N
5597.21 5053.43 4990.00 1199.09 N
5880.12 5263.43 5200.00 1317.14 N
7752.75 6653.43 6590.00 2098.54 N
7847.05 6723.43 6660.00 2137.90 N
7995.24 6833.43 6770.00 2199.73 N
9046.07 7613.43 7550.00 2638.22 N
9288.56 7793.43 7730.00 2739.41N
9625.37 8043.43 7980.00 2879.94 N
9813.98 8183.43 8120.00 2958.65 N
10150.78 8433.43 8370.00 3099.19 N
10366.33 8593.43 8530.00 3189.13 N
10406.75 8623.43 8560.00 3206.00 N
10460.64 8663.43 8600.00 3228.48 N
10521.97 8708.43 8645.00 3254.60 N
10712.85 8813.43 8750.00 3363.17 N
13820.59 8988.43 8925.00 6019.49 N
Sperry-Sun Drilling Services
Eastings Formation Name
(fi)
81.62 E UG1/UgS
394.14W WS1/West Sak
542.48W CM3/K-12
1524.33W Kuparuk
1573.77W LCU
1651.47W Miluveach
2202.44W Top Kingak/TJH/TJG
2329.58W TJF
2506.18W TJE
2605.07W TJD
2781.66W TJC
2894.68W TJB
2915.87W TJA
2944.12W Sag River
2976.58W Shublik
3091.21W Top Sadlerochit/TZ4
2488.72W TZ3
Proposal Report for S-24A Wp4
Alaska State Plane Zone 4
PBU_WOA S Pad
Continued...
18 November, 1998.15:04
-6-
DrillQuest
S-24 Wellhead:
Nabors 7ES:
'X' Nipple @ 2200'
13-3/8", 72#, L-80
BF / NtSL = 37.05'
KB / MSL = 63.43'
6 Gas Lift Mandrels
7", 26~ L-80 BTC-Mod Liner Top
9-5/8" Milled
section from
3800' to
17# K~O.
C~rnent
Plug
-~LUDdzontal Side~
AFE #4Pt200 30 Days $3,379
APl #50-029-22044-0t
Zone 4 Development Injection Target
7" L-80 Intermediate Casing to TSag
4-1/2" L-80 Cemented Liner
4-1/2" L-80 NSCT Completion
Designed for future CTU sidetrack
4-W2", 12.6~, L-80 NSCT Tubing
7" x 4.5" Baker Packer ~
4-1/2", 12.6# L-80 IBT-Mod Production Liner Top
7" Shoe @ TSag ~
Shoe
9734~
Sqz'd Perforations:
9834' - 10,t32'
DATE REV. BY
11/19/98 CMJ
COMMENTS
Proposed Completion
PBTD
7" 26~ L-80
PJ~U~E. BAY~.UNIT
BP Exploration
...hared
ervices
a rilling
WELL NAME
S-24Ai
DRILLING PERMIT/SUNDRY/PRE-RIG
COVER SHEET
IThe attached work cannot commence without obtaining the required signatures in
the "APPROVAL TO PROCEED" section at the bottom of this cover sheet.
"APPROVAL TO PROCEED" will signify AOGCC approval has been received.
This cover sheet is applicable to: (only one category per cover sheet)
~'] DRILLING PERMIT
SUNDRY NOTICE
['~ Permit Documentation Prepared:
pODE: ~2.~~~'~ Date:X.¢e~
ermitrA, pplication ~e~ewed:
~ SDE~S~W~ff '
I xl pe~~~}?n
~b~tted:
TA: ~~~ Date: P~/~
---i Sundry Documentation Prepared:
ODE: Date:
"--]Sundry Application Reviewed:
SDE/ES: Date:
[~] Sundry Application Submitted:
TA: Date:
NOTE:
IF SUNDRY IS FOR PRE-RIG WORK, USE
PRE-RIG WORK SECTION AT BELOW LEFT
AND CHECK "ABANDON" BOX BELOW
PRE-RIG WORK
[--~ Pre-Rig Memo Reviewed:
SDE/ES: Date:
[ [ Pre-Rig Memo Sent to Slope:
ODE: Date:
]--"[ Pre-Rig Sundry Documentation Prepared:
ODE: Date:
~ Pre-Rig Sundry Application Reviewed:
SDE/ES: Date:
] [ Pre-Rig Sundry Application Submitted:
TA: Date:
Reason for Sundry (Check all that apply)
Abandon
Alter Casing
Suspend
Repair Well
Plugging
Pull Tubing
Variance
Change Approved Program
Operation Shutdown
Re-enter Suspended Well
Time Extension
Perforate
Stimulate
Other(Explain):
APPROVAL TO PROCEED
Approved AOGCC Permit/Sundry Received TA: Date:
Approval to Commence Operations SDE/ES: Date~
_ hared
',, er.vices
nlling
WELL NAME
S-24Ai
DRILLING PERMIT/SUNDRY/PRE-RIG
COVER SHEET
IThe attached work cannot commence without obtaining the required signatures in
the "APPROVAL TO PROCEED" section at the bottom of this cover sheet.
"APPROVAL TO PROCEED" will signify AOGCC approval has been received.
This cover sheet is applicable to: (only one category per cover sheet)
DRILLING PERMIT
,,
Permit Documentation Prepared:
ODE: ~.2.~ Date:'¢q/q~
~Permit/~pplication J~e2fi.ewed:
SDE/ES~-~ ~/' n~
Permi(/)p~, J~j~},on Submitted:
IA: C-~ ~7,~'~- Date:/./~¢/~/(
SUNDRY NOTICE
[~] Sundry Documentation Prepared:
ODE: Date:
D Sundry Application Reviewed:
SDE/ES: Date:
D Sundry Application Submitted:
TA: Date:
NOTE:
IF SUNDRY IS FOR PRE-RIG WORK, USE
PRE-RIG WORK SECTION AT BELOW LEFT
AND CHECK "ABANDON" BOX BELOW
PRE-RIG WORK
Pre-Rig Memo Reviewed:
SDE/ES: Date:
Pre-Rig Memo Sent to Slope:
ODE: Date:
Pre-Rig Sundry Documentation Prepared:
ODE: Date:
Pre-Rig Sundry Application Reviewed:
SDE/ES: Date:
Pre-Rig Sundry Application Submitted:
TA: Date:
Reason for Sundry (Check all that apply)
Abandon
Alter Casing
Suspend
Repair Well
Plugging
Pull Tubing
Variance
Other(Explain):
Change Approved Program
Operation Shutdown
Re-enter Suspended Well
Time Extension
Perforate
Stimulate
APPROVAL TO PROCEED
Approved AOGCC Permit/Sundry Received TA: Date:
Approval to Commence Operations SDE/ES: Date~
_ hared
......... .ry(ces
Alask; nll ng
WELL NAME
S-24Ai
DRILLING PERMIT/SUNDRY/PRE-RIG
COVER SHEET
IThe attached work cannot commence without obtaining the required signatures in I
the "APPROVAL TO PROCEED" section at the bottom of this cover sheet.
I
"APPROVAL TO PROCEED" will signify AOGCC approval has been received.
This cover sheet is applicable to: (only one category per cover sheet)
DRILLING PERMIT
[~] Permit Documentation Prepared:
ODE: 0.2.~ Date:X,¢~
[~Permit/~pplic ati..o-n e~ewed:
~ SDE/ES~W~' ~ Date:///~~
I~l eermiC/~PruP}l~,on S~.ubmitted:
TA: t_~ ~I~.~~ - Date:/.t/~¢'~/
PRE-RIG WORK
Pre-Rig Memo Reviewed:
SDE/ES: Date:~
Pre-Rig Memo Sent to Slope:
ODE: Date:~
Pre-Rig Sundry Documentation Prepared:
ODE: Date:~
Pre-Rig Sundry Application Reviewed:
SDE/ES: Date:
Pre-Rig Sundry Application Submitted:
TA: Date:__
SUNDRY NOTICE
D Sundry Documentation Prepared:
ODE: Date:
D Sundry Application Reviewed:
SDE/ES: Date:~
["~ Sundry Application Submitted:
TA: Date:
NOTE:
IF SUNDRY IS FOR PRE-RIG WORK~ USE
PRE-RIG WORK SECTION AT BELOW LEFT
AND CHECK "ABANDON" BOX BELOW
Reason for Sundry (Check all that apply)
Abandon Change Approved Program
Alter Casing Operation Shutdown
Suspend Re-enter Suspended Well
Repair Well Time Extension
Plugging Perforate
Pull Tubing Stimulate
Variance
Other(Explain):
I APPROVAL TO PROCEED I
Approved AOGCC Permit/Sundry Received TA: Date:
Approval to Commence Operations SDE/ES: Date:
I DATE / [ CHECK"O. /
VENDOR /~LASKAST 1 4 OO
DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET
O& 149c; CKO& 1499A 100. OC 100. OC
HANDLING INST: S/k TERRI HUBBLI: X462B ~
THE ATrACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. ml[e]lE'llE -~ 100. O0 100. O0
BP EXPLORATION (ALASKA);:;:.I, NC.;.
· i ";:i ' : "i AN;:i~F~iLIATE.~'F: .;;i:i', ..... '
RO."BOX: ;196612 !':,i!. i, ."': ;:: :';~,
:' AN~:HoRAGEiALASKX'?'99519-6612 ~:::'~;:, ~'/ ':::::''~ ....":"::"'" ::~':'' :;.'::': ...... ~EEVEEANO, OR,'o .,,, .
· :,;~:.:~., ~:,~ :~:' :;:,:,.: :';':: ': .:;~;~;]':~:389 :',;[ :,::', ,:'[.: :::.:.,
412
No,. ,H 3:0 9:, 91
PAY
,,Ti]:' The!:
:ORDER
' 0-~
,' ;1, 53,0 cl ci,' ~:0 h ]. 80 ~,8 cl 5': 008 h
H143098
09/21/e8 00i43068
VENDOR ALASKAST] 4 CT>
DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS I DISCOUNT NET
09219B CKO92!9SE I00. O0I i00. O0
HANDLING INST'
i
i
¢ o.
BP EXPLORATION (ALASKA), INC.
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
FIRST NATIONAL BANK OF ASHLAND
AN AFFILIATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
56 -389
412
No. H 143068
CONSOLIDATED COMMERCIAL ACCOUNT
00143068
PAY
To The
O~'de~
O.~
ONE HUNDRED & ******************************************* US DOLLAR
ALASKA STATE DEPI OF REVENUE
3OO1 PORCUPINE DR
ANCHORAQE
99501-3120
DATE AMOUNT
09/2i/98 1 [ $10C).0C)I
NOT VALID AFTER 120 DAYS
WELL NAME/~/ ~"---~'"/~),~ PROGRAM: exp ann. disposal para req
FIELD & POOL. ~ ~//~/~s",,'5 INIT CLASS /- ~ ~'~
ADMINISTRATION 1. Permit fee attached .......................
2. Lease number appropriate ...................
3. Unique well name and number ..................
4. Well located in a defined pool ..................
5. Well located proper distance from drilling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficient acreage available in drilling unit ............
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
D,~TE / 12. Permit can be issued without administrative approval ......
~~"13. Can permit be approved before 15-day wait ...........
ENGINEERING 14. Conductor string provided ...................
15. Surface casing protects all known USDWs ...........
16. CMT vol adequate to circulate on conductor & surf csg .....
17. CMT vol adequate to tie-in long string to surf csg ........
18. CMT will cover all known productive hodzons ..........
19. Casing designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
21. If a re-drill, has a 10-403 for abandonment been approved...
22. Adequate wellbore separation proposed .............
'.: 23. If diverter required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequate .....
25. BOPEs, do they meet regulation ................
DATE 26. BOPE press rating appropriate; test to ~ ~--.~30 psig.
27. Choke manifold complies w/APl RP-53 (May 84)
28. Work will occur without operation shutdown ...........
29. Is presence of H2S gas probable .................
dev redrll ~ serv ~ wellbore seg
GEOL AREA ~' ~;) UNIT#
N
N ,~
N 7~
ON/OFF SHORE
Y N
(~N
(~)N
(~ N
Y N
N
GEOLOGY
30. Permit can be issued w/o hydrogen sulfide measures ..... Y N /,,/
31. Data presented on potential overpressure zones ....... Y,,~,. ,~j ~/
32. Seismic analysis of shallow gas zones ............. .,Y/' N /' / iv'/'/- / ,.~
33. Seabed condition survey (if off-shore) ............. //Y N / -
34. Contact name/phone for weekly progress reports [exploratory ~]~ly] Y N
ANNULAR DISPOSAL
APPR DATE
35.
With proper cementing records, th?~af~
(A) will contain waste in a~suffaSle rece/iyifig zone; ..... ,.:... Y N
(B) will not contamin~ate~freshwater~ cause drilling w_..as~l~:.. Y U
to su~ace; ~ / _ ~A_
(C) will n~~f~el~ ~ed for disposal; Y N
(D) will ~impai~ov~m a Y N
po~; and
(E) will not circumvent 20 ~C 25.252 or 20 ~C 25.412. Y N
GEO~J~Y;
ENGINEERING: UIC/An~f COMMISSION:
JDH .-.:, RNC
Comments/Instructions:
, ,,
c:~nsoffice\wordian\diana\checklist
FIELD & POOL. __.~'~...~::~..~'<:~'
WELL PERMIT CHECKLIST
COMPANY
WELl_ NAME
AREA
ADMINISTRATION 1.
2.
3
4
5.
6.
7.
8.
9.
10.
11.
APPR A'I 12.
ENGINEERING
INIT CLASS ,/-' ~.,,./, ,~,,"7-
...':__- ..... lz
Permit fee attached .......................
Lease number appropriate ..................
Unique well name and number. ...............
Well Iocaled in a defined pool ................
Well located proper dislance from drilling unit bot, ndmy ....
Well located proper distance from other wells ..........
Sufficient acreage available in drilling [Init ............
If deviated, is wellbore plat included ...............
Operator only affected party ...................
Operator has appropriate bond in force .............
Permit can be issued without conservation order ........
Permit can be issued without administrative approval ......
Can permit be approved before 15-day wait ...........
DA'rE
14. Conductor string provided ...................
15. Surface casing protects all known USDWs ...........
16. CMl- vol adequate to circulate on conductor & surf csg .....
17. CM I' vol adequate to tie-in long string to surf csg ........
18. CM I' will cover all known productive horizons ..........
19. Casing designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
21. If a re-drill, has a ~10-403 for abandonmenl been approved...
22. Adequate wellbore separation proposed .............
23. If diveder required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequate .....
25. BOPEs, do they meet regulation ................
26. BOPE press rating appropriate; test to__,A--O (3 ~ psig.
27. Choke manifold complies w/APl RP-53 (May 84) ........
28. Work will occur without operation shutdown ...........
29. Is presence of H2S gas probable .................
GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures .....
31. Data presented on potential overpressure zones .......
32. Seismic analysis of shallow gas zones ..... ' ........
33 Seabed condition survey (if off-shore) .............
AJ~)R DATE,, 34. Contact name/phon.e_for weekly progress reports .......
~_~___///~2_~//~_/~ [exploratory only]
ANNULAR DISPOSAL 35. With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone!,.g/...
APPF~ I)A'1'E (B) will not cont,aminale freshwater; or cause~g waste.. ,
Io .surface; (.,__..__ ~
................................(C) will riOl impair mechanical int~,~jrffy o~TTi~m~ ulL~d for disposal;
(D) will nol damage produci~pej~on'nation or impair rec~om a
, , .......................... pool; and
,(E) will nol circ~ AAO 25.252 or 20 AAO 25.412.
GEOL
~"-.,~- ,~7""~,~'" PROGRAM: exp ~J dev [] redrll~serv_~wellbore seg II ann. disposal para
~? 0 UNIT// ,~"'//~::::~__.__ ON/OFF SHORE ~::~..~__.
N
N
N
N
~::)N
Y N
M c, hekhsl ~*';v 05/2919[I
G E _O__L,,~,,,QG Y: ENGINEERING: U I~'_r COMMISSION:
co
Cornmentsllnstructions:
dll C \ru~nfh( r!~w¢~uliau\dul~ I; ,\r I," I' h' I