Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout198-245 Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. J q ~/~/'-j'5 File Number of Well History File PAGES TO DELETE RESCAN Color items- Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: Complete [] Other- Pages: DIGITAL DATA ~ Diskettes, No, ~ [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS' Scanned by:~ Mildred Daretha Nathan Lowell [] TO RE-SCAN Notes: Re-Scanned by: Bevedy Mildred Daretha l~Lowell Date: ~/~0 Isl ~ f r (STATE OF ALASKA ( ALASKA OIL AND GAS CONSERVATION COMMISSIO~ E C E IVE D WELL COMPLETION OR RECOMPLETION REPORT AND LO&EC 2 9 2003 ., , ^"'" ^ ^ ^ 1a. Well Status: 0 Oil 0 Gas 0 Plugged 181 Abandoned 0 Suspended 0 WAG ""al'8.~~I~~s~~"Ò)' lIUII 20AAC 25.105 20AAC 25.110 0 cAReh:Qntgett 0 Exploratory 0 GINJ 0 WINJ 0 WDSPL No. of Completions Zero Other 0 Stratigraphic 181 Service 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit Number BP Exploration (Alaska) Inc. 10/14/2003 ' 198-245 303-292 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 08/13/1999 50-029-22044-01-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Number Surface: 09/02/1999 PBU S-24A 1633' SNL, 10~0' EW~, SEC. 35, T12N, R12E, UM 8. Elevation in feet (indicate KB, OF, etc.) . Top of Productive HOrizon: -' 15. Field and Pool. 1844' NSL 1820' WEL SEC 27 T12N R12E UM KBE - 63.77 Prudhoe Bay Field / Prudhoe Bay , ,.", Pool Total Depth: 9. Plug Back Depth (MD+ TVD) 2584' NSL, 3948' WEL, SEC. 27, T12N, R12E, UM 12599' + 8928' Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+ TVD) 16. Lease Designation and Serial No. Surface: x- 619212 y- 5979855 Zone- ASP4 12700' + 8918' Ft ADL 028258 TPI: x- 616283 y- 5983286 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit: Total Depth: x- 614143 y- 5983994 Zone- ASP4 N/A MD -- 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey 0 Yes 181 No N/A MSL 1900' (Approx.) 21. Logs Run: " MWD, GR, RES, NEU, DEN, Sonic, RFT, CBT, US IT 22. CASING, LINER AND CEMENTING RECORD CASING '. SETTING DEPTH HOLE . SIZE WT~ PERFT,' . GRADE. OP '. ,BOTTOM SIZE CEMENTING RECORD' AMOUNT PULLED 20" Insulated Conductor Surface 110' 8 cu yds Concrete 13-3/8" 68# L-80 Surface 2668' 17-1/2" 2580 cu ft Arcticset II & III 7" 26# L-80 34' 10180' 8-1/2" 1403 cu ft Class 'G' 4-1/2" 12.6# L-80 10003' 12687' 6" 432 cu ft Class 'G' 23. Perforations open to Production (MD + TVD of Top and 24.' '.', '" '" "", ",' 'tb'B~I~(3)REêÓRD''' '"",i.'i,:i'(~";',,;,i .,.' Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) None 4-1/2", 12.6#, L-80 10008' 9952' MD TVD MD TVD 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 12377' - 12597' Placed 56 Bbls CAC03/Flo-Pro Slurry --;;6 across perfs. Squeezed approximately ~1tÅ1 22 BBLs into perfs. 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/ A Date of Test Hours Tested PRODUCTION FOR Oll-Bsl GAs-McF WATER-BSl CHOKE SIZE I GAS-Oil RATIO TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + Oll-Bsl GAs-McF WATER-BSl all GRAVITy-API (CORR) Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None _BFL 1E31. Form 10-407 Revised 2/2003 CONTINUED ON REVERSE SIDE G (:;; {' '28. GEOLOGIC MARKER~ 29, FORMATION TESTS Include and briefly summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag River 10182' 8724' None Shublik 10232' 8765' Sadlerochit I Zone 4B 10428' 8863' Zone 4A 11510' 8983' Zone 4A 11752' 9008' Zone 4A 12232' 8967' Sadlerochit 12685' 8920' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble Title Technical Assistant Date'::L/:2.. 9 ~ PBU S-24A 198-245 303-292 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit NO.1 A roval No. Drilling Engineer: Mark Johnson, 564-5666 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 2/2003 ( ( well: S-24B Accept: 11 /05/03 Field: Prudhoe Bay Unit Spud: 11/07/03 API: 50-029-22044-02 Release: 11/13/03 Permit: 203-163 Rig: Nordic #1 Date PRE-RIG WORK 09/29/03 DRIFT W/ 3,80 CENT & SAMPLE BAILER TO TOP OF MCX, (S, BAILER EMPTY). RAN 41/2" EQ PRONG TO MCX. PULLED MCX @ 2172\ SLM. SER# M-38B, .75 BEAN. TAGGED XN NIPPLE @ 9966' SLM, S, BAILER ,EMPTY. 10/14/03 T/I/O= 1890/500/150, CAC03 SAND DUMP, PLACE A 56 BBL CAC03/FLO-PRO SLURRY ACROSS PERFS TO SECURE WELL FOR CTD PREP. SQUEEZED APPROXIMATELY 22 BBLS THROUGH v PERFS, 34 BBLS SLURRY ABOVE TOP SET OF PERF (2244') FINAL LINER LEAK OFF RATE 232 PSI/30 MINUTES, HESITATED SQUEEZE SEVERAL TIMES. INJECTIVITY RATE LESS THAN .1 BPM AT 1100 PSI WHP. SECURE WELL FOR NIGHT, DEAD CRUDE IN TUBING, SURFACE TO 3564'. LEFT 850 PSI ON TUBING. 10/15/03 T/I/0=900/0/480. FREEZE PROTECT FLOWLINE W/15BBLS NEAT METHANOL. PUMP 25 BBLS CRUDE DOWN TBG, NOT EXCEDING 1200PSI. FINAL WHP; T/I/0=880/0/500, 10/17/03 PERFORM WEEKLY BOP TEST, RIH WITH 2.5" JSN WITH A 0.365" CENTER HOLE. RIH AND HOLE WAS CLEAN TO PBTD. TAGGED PBTD AT 12,576' (UP DEPTH). HARD TAG W/CLEAN PICKUP, ATTEMPTED TO JET OFF WITH FLO PRO AND 1% KCL W/O SUCCESS. PUMPED 10 BBL OF FLOW PRO SWEEP OFF BOTTOM W/PUH TO 12250' AND BACK DOWN TO 12576' CTMD FOR FINAL FLO PRO SWEEP, MADE RETURNS CHECK W/40 BBL GAUGE TANK - RETURNS 92- 95% AT 2,5 BPM, 10/18/03 MADE FINAL 20 BBL FLO PRO SWEEP ON BOTTOM AT 12,576' CTMD AND CHASE OUT HZ SECTION AT 40% AND THEN 80% TO SURFACE WHILE PUMPING 1% XSL KCL. MU 2-7/811 PDM W/3.8011 DIAMOND SPEED MILL AND RIH TO 9926' CTMD', MILL XN NIPPLE AT 99851 CTD, MAKE 2 MILLING UP/DOWN PASSES AND 2 DRY PASSES, RIH TO TAG TD, HAD TO TURN MILL TO KEEP FROM STACKING IN BUILD SECTION OF LINER WHILE RIH, MILLED OUT STICKY AREA IN PERFS AT 12480' CTD, GET FINAL DRY TAG AT 125721 CTM, PUH ABOVE NIPPLES, CHECK LOSSES, AVERAGE 17% WITH 650PSI WHP /6 - 80/0 AT 350PSI WHP, POOH FREEZE PROTECT WELL WITH 60/40 METH TO 2500'. TRAP 500PSI ON WELL. MILL STILL GAUGES 3,8011 SHOWED LITTLE WEAR. RDMO, t ( BP EXPLORATION Page 1. Operations Summary Report Legal Well Name: S-24A Common Well Name: S-24A Spud Date: 4/24/1990 Event Name: REENTER+COMPLETE Start: 11/5/2003 End: 11/13/2003 Contractor Name: NORDIC CALISTA Rig Release: 11/13/2003 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 11/512003 17:00 - 17:30 0.50 MOB P PRE Safety meeting prior to moving off of S-1 02L 1. 17:30 - 18:30 1.00 MOB P PRE Move rig from S-102 L 1 to S-24 B. 18:30 - 19:00 0.50 MOB P PRE Safety meeting prior to moving over well s-24B. 19:00 - 19:30 0.50 MOB P PRE Move rig in over S-24 B. 19:30 - 21 :30 2.00 RIGU P PRE Set rig down over S-24. Begin nippling down swab cap, and NU BOP stack. Call for berm crew to set tiger tank and cuttings box. Spot KCL vac truck to on load water for displacing freeze protect. Accept rig at 19:30 hours. 21 :30 - 00:00 2.50 BOPSUF P PRE Weekly BOP pressure test. Witness waived by State of Alaska, AOGCC, John Crisp. 11/6/2003 00:00 - 02:00 2.00 BOPSUF P PRE Continue with weekly BOP test. All items passed. no failures. 02:00 - 02:40 0.67 STMILL P WEXIT Pre spud meeting with rig crew to discuss well plan. Also discuss plan forward for milling float equipment. 02:40 - 03:10 0.50 STMILL P WEXIT Check WHP. Well dead. Make up milling BHA as per proceedure. 03: 10 - 05:25 2.25 STMILL P WEXIT RIH with BHA #1; 3.80 DSM, 3.80 string reamer, Baker Extreme motor, PH6 MHA. Start mud downhole when at 9500'. 05:25 - 05:35 0.17 STMILL P WEXIT Tagged up at 12507'. PBTD should be equal to 12599'. Last tag by service coil unit was at 12576'. PU, @ 44 klbs. Finish circulating mud to bit. Pumping at 2.6/2.42/2050 psi. 93% returns at this pump rate and pressure. Check mechanical vs electrical depth counters to confirm accuracy. Both counters agree. Assume that tag is CaC03 fill in hole. 05:35 - 05:50 0.25 STMILL P WEXIT Mud to bit. Begin milling on suspected fill. Pit vol=empty, taking on mud thru coil. IAP=10 psi, OAP=81 psi. Tag up and begin milling at 12506'. Seems to drill off reasonably easily. It does not look to be the liner wiper plug. Broke thru after 3'. Tag up again at 12606'. MAke a -7' correction to get on depth to PBTD. Note, the correction used on the last well was -6', so depths are consistent. 05:50 - 10:45 4.92 STMILL P WEXIT Begin milling liner wiper plug and landing collar. Mill landing collar and float collar. Mill to 12,604'. 10:45 - 10:50 0.08 STMILL P WEXIT Back ream float collar and landing collar. 10:50 - 12:00 1.17 STMILL P WEXIT Pull up hole out of horizontal section to clean hole. 12:00 - 12:30 0.50 STMILL P WEXIT RIH from 10,250'. 12:30 - 13:45 1.25 STMILL P WEXIT Continue milling cement at 90 fph to 12,685'. 13:45 - 14:00 0.25 STMILL P WEXIT Back ream float equipment area at 12,600'. 14:00 - 14:50 0.83 STMILL P WEXIT Mill float shoe. Bust through shoe at 12,687.2'. RIH and tag up at 12,700'. 14:50 - 15:20 0.50 STMILL P WEXIT Drill formation to 12,701'. 15:20 - 16:00 0.67 STMILL P WEXIT Start hi visco sweep down coil. Ream from 12,700' to 12,500'. Drift from 12,480' to 12,701' with pump off. Pump sweep out coil. 16:00 - 18:15 2.25 STMILL P WEXIT POOH pumping at 2.5 bpm. Hold pre spud meeting. Review well plan hazards and mitigations with rig crew. 18:15 - 18:35 0.33 STMILL P WEXIT OOH. Stand back injector. Lay down motor and mills. DSM 3.80 in the hole, 3.78" OOH. String mill 3.80" in the hole, 3.79" OOH. 18:35 - 19:10 0.58 STMILL P WEXIT MU BHA #2,3.125" Venturi basket. Printed: 11/1712003 8:40:18 AM ( ( BP EXPLORATION Page 2"" Operations Summary Report Legal Well Name: S-24A Common Well Name: S-24A Spud Date: 4/24/1990 Event Name: REENTER+COMPLETE Start: 11/5/2003 End: 11/13/2003 Contractor Name: NORDIC CALISTA Rig Release: 11/13/2003 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 11/6/2003 19:10-21:10 2.00 STMILL P WEXIT RIHwithBHA#2torunventurijunkbasketaccrossmilled area. Pumps down while RIH. 21 :10 - 21 :30 0.33 STMILL P WEXIT 12590'. Kick on the pumps to 2.34 bpm, 3800 psi to activate junk basket. Work down to TO at 30 fpm. No weight loss or bobbles observed. Pull back up to 12590'. Repeat a second time. 21 :30 - 23:00 1.50 STMILL P WEXIT POOH, continuing to circulate to pick up any heavier debris that has been strung up the hole. 23:00 - 23:40 0.67 STMILL P WEXIT Tag up at surface. Send derrick hand up to stabbing boards to confirm we are not icing up. Stand back injector. Dump the venturi basket. Found very few pieces of debris. About 1/4 cup of small aluminum and formation pieces. Rig down Venturi basket BHA. 23:40 - 00:00 0.33 DRILL P PROD1 Safety meeting prior to picking up first drilling BHA. 11/7/2003 00:00-01:15 1.25 DRILL P PROD1 MakeupBHA#3,firstOHlateralsectionBHA.4.125"Hycalog bicenter bit, 1.2 deg Baker motor, Directional-GR, MHA. Also rehead coil tubing. Pull test CTC to 35 klbs, PT to 4000 psi. Stab on injector. 01 :15 - 03:30 2.25 DRILL P PROD1 RIH with first drilling BHA. Shallow hole test of orienter at 2770' passed ok, continue to bottom. 03:30 - 04:20 0.83 DRILL P PROD1 Log tie in pass up from 12590'. Make -21' correction. 04:20 - 04:45 0.42 DRILL P PROD1 Orient straight down. Attempt to orient in hole below shoe. Can't get clicks. PU into casing and try to orient, no success. RIH to bottom to stall motor and see what happens. Finally managed to get orienter to work. , ree Spin pSI at. pm. n I a ead from 12693'. Drilling at 2.6/2.15/3400 psi. ROP=40 fph. Taki new mud. IAP=15 psi, OAP=107 psi. 05:30 - 08:40 3.17 DRILL P PROD1 Returns have improved as we get away from t old perfs. 2.50/2.45/3325 psi. Continuing to drill a to 12,772'. 08:40 - 08:50 0.17 DRILL P PROD1 Pull BHA into casing to make sure es not hang up on float equipment. No problems. 08:50 - 12:40 3.83 DRILL P PROD1 Drill at 2.6/2.6 3,300 p. ~O L TF. 20 to 30 fph in shublik. Drill to 12,865'. RO creasing, drilling in 24. 12:40 - 15:00 2.33 DRILL P PROD1 12865', POO U resistivity tool. Pump at 2.5 bpm while POOH. 15:00 - 17:30 2.50 DRILL P PROD1 Sta ack injector. Change out MWD probe and pulser. ange motor bend to 1.5 degree. Change bit to 3.75" OS 49 H+GJNU. PU resistivity tool. Confidence test MWD tools. 17:30 - 19:55 2.42 DRILL P RIH with BHA #4, RES tool, DS49 bit, 1.5 deg motor. 19:55 - 22:10 2.25 DRILL P Tag bottom. Set depth to last tagged depth of 12865'. Made a -19' correction. Make a MAD pass for missing RES data and tie in to previous run. Make a +6' correction. 22:10 - 22:20 PROD1 Orient to 110L. 22:20 - 00:00 PROD1 12871', Resume drilling at 2.5/2.4/3260 psi. Free spin 2800 psi at 2.5 bpm. IAP=43 psi, OAP=126 psi. Pit vol=325 bbls. ROP=50 fph. 11/8/2003 0.75 DRILL P PROD1 12947', Drilling ahead as per geo. 2.65/2.55/3450 psi. Pit vol=313 bbls. IAP=51 psi, OAP=129 psi. 0.08 DRILL P PROD1 13005', Take a couple of clicks. 0.58 DRILL P PROD1 Resume drilling. Printed: 11/17/2003 8:40:18AM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 1. Type of Request: [] Abandon [] Suspend [] Operation Shutdown [] Perforate I-! Vadance [] Other [] Alter Casing [] Repair Well [] Plug Perforations [] Stimulate [] Time Extension [] Change Approved Program [] Pull Tubing [] Perforate New Pool [] Re-Enter Suspended Well [] Annular Disposal 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. [] Development [] Exploratory 198-245 '3. Address: [] Stratigraphic [] Service 6. APl Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22044-01-00 7. KB Elevation (ft): KBE = 63.77' 9. Well Name and Number: PBU S-24A '/'' 8. Property Designation: 10. Field / Pool(s): ADL 028258 Prudhoe Bay Field / Prudhoe Bay Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft):I Effective Depth MD (ft): IEffective Depth TVD (ft): Plugs (measured): Junk (measured): 12700' 8918' I . . 12599' I 8928' None None :Casin~l ' Len~lthi:! i::,,i ::,.S,iZe.. :,:': ,,:~D i:::' :';,:",: BurSt : .:COllaPse S,tr~q,t~iral Conductor 110' 20" 110' 110' Surface 2668' 13-3/8" 2668' 2668' 5020 2270 Intermediate 10146' 7" 10180' 8722' 7240 5410 PrQdu¢iQfl Liner 2684' 4-1/2" 10003' - 12687' 8565' - 8919' 8440 7500 Perforation Depth MD (ft): I Perforation Depth TVD (ft):I Tubing Size: Tubing Grade: Tubing MD (ft): 12377'-12597'I I, 8950'-8928' 4-1/2", 12.6# L-80 10008' ' Packers and SSSV Type: 7" Baker 'S-3' packer; Packers and SSSV MD (ft): 9952' 4-1/2" HES SSSV Nipple 2195' 12. Attachments: 13. Well Class after proposed work: [] Description Summary of Proposal [] BOP Sketch [] Detailed Operations Program [] Exploratory [] Development [] Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: September 23, 2003 [] Oil [] Gas [] Plugged [] Abandoned 16. Verbal Approval: Date: [] WAG [] GINJ [] WINJ [] WDSPL Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Mark Johnson, 564-5666 Printed Name Mark Johnson ~ Title CT Drilling Engineer ~~,~_, ,., L i ~t.,,7,t.,~.~ ¢,~i~ ~/~,~ Prepared By Name/Number: Signature (~.. ; '~-----'--Phone 564-5666 Date ~ Terrie Hubble, 564-4628 :.: ~,/~,"' Commission Use Only ~ ' C~m'/'' I Sundry Number: ~---"'~);~,, ~q ~ Conditions of approval: Notify mission so that a representative may witness - [] Plug Integrity [] BOP Test [] Mechanical Integrity Test [] Location Clearance Other: Subsequent form required 10- Approved By: ~h I:Nlllrt COMMISSIONER THE COMMISSION Date Form 10-403 Revised 2/2003 Su)mit I ~ cate ORIGINAL To: Winton Aubert Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Mark O. Johnson CTD Engineer Date: September 17, 2003 Re: P&A operations for well PBU S-24A as part of the CTD sidetrack Well S-24A is scheduled for a through robing sidetrack with the SLB/Nordic 1 Coiled Tubing Drilling rig on 9/30/03. The sidetrack, S-24B (injection well), will exit out of the existing 4 ½" liner float shoe and 'target Zone 4 sands to the Northwest. The existing injection perforations in S-24A will be abandoned by liner cement from the S-24B liner. The following describes work planned for the P&A and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. Pre CTD Summary (phase 1) .... 1) Slickline -Drift tubing. Pressure test IA to 3000 psi. 2) CT - Cleanout liner to PBTD. Drift with 3.8" mill to landing collar at 12599'. CTD Sidetrack Summary (phase 2} 1) MIRU CTD rig. 2) Mill out shoe track with 3.80" OD diamond speed mill. 3) Drill 4 1/8" x 3.75" bicenter bit openhole sidetrack to ~14250' TD with MWD/gamma ray/resistivity. 4) Run 3 3/1.6" x 2 7/8" solid liner completion and cement with 26 Bbls of 1.5.8 ppg class G cement. WOC. Pressure test liner and lap to 2000 psi. Run liner top packer if needed. P&A of S-24A is complete. 5) Perforate S-24 B liner 6) RDMO. The pre CTD work is slated to begin on 9/23/03. Mark O. Johnson / / CTD Drilling Engi~r 564-5666, 240-8034 CC: Well File Sondra Stewman/Terrie Hubble TREE= 4-1/8" Ck, V [ '[ - WELLHEAD = McEV OY SAFETY NOTES: 9-5/8" CSG CUT, PULLED & MILLED ACTUATOR= AXFI SON S 24A FROM SURFACE TO STUB @ 2739' HORIZONTAL LNR. KB. FIL:~/ = 64.77' ~, 70° @ 10383' AND90° @ 11758' BF. B. EV = 35.43' ., mmm · ~ m KOP= 2782' ~X Angle = 97@12411 -,---,~ - t 2195' H4-1/2" I-ES SSSV NIP, ID = 3~813" I Datum IVD = 10430' I O , DatUm 'rVD = 8800, SS I .,:~-~,~,. ~. ~,, ,,,,-~,o, MinimumlD=3.725"@9996' i~~~' 9941' H-1~"KN,,.,D=3.813"I 4-112" XN NIPPLE I XX)0(XX~ \. \\ ' ' ' ' ' -- I I 19-5/8"EZSV~J 3020' ~~ ~ '~X ' . ' ' IOLD9-5/8"CSI' G , '~ ~, ~ 9975' H4'1/2"XNIRID=3.813"I, , , I ~ ~4.1/Z, XN NiP, D = 3.725- X'X~ X~ I 10004' ,~?ELMDTTLOGGED00/24/99 I XX ,ooo ITOP OF "112" LI"P' H :?03' ~ I 4.,.1/2" TBG, 12.6#, L-80, 0.0152 bpf, ID= 3.9 , ,~ bO~: 'X ..~ ANGLEATTOPPERF: 97 SIZE SPF INTERVAL Opn/Sc~z DATE .... 2-7/8" 4 12377-12597 O 09/99 14-1/Z'LNR, 12.6#,L-80,0.0152bpf, ID=3.958"H 12687' DATE REV BY COIVIVIENTS I DATE ~ BY i COMIVE_NTS I PRUDHOEBAY UNIT 05/12/90 ORGINAL COk, PLETION = I I WELL: S-24A 09/07/99 SIDETRACK COMPLETION I , PERMIT No: 198-2450 03/14/01 SIS-IVl-I CONVERTED TO CANVAS I APl No: 50-029-22044-01 03/15/01 SIS-MD FINAL I SEC35, T12N, T12E 03/02/02 RN/TP CORRECTIONS ~ BP Exploratbn (Alaska) ,,, SIZE SPF INTERVAL Opn/S(:lz DATE 2-7/8" 4 12377 - 12597 O 09/99 DATE REV BY COIVlVIENTS DATE ~ BY COMk/F_NTS 05/12/90 ORGINAL COIVPLETION 09/07/99 SIDETRACK COMPLETION 03/14/01 SIS-k/Il CONVERTED TO CANVAS 03/1 5/01 SIS-MD FINAL 03/02/02 RN/'rP CORRECTIONS ,,, ~ = 4-1/8" ClW WELLHEAD = McEVOY A~TOR = AXELSON KB. ELEV = 64.77' BF. ELEV = 35.43' KOP = 2782' Max Angle = 97 @ 12411' Datum MD = 10430' Datum TVD = 8800''ss S-24B Proposed CTD Sidetrack FSi;- OTES: 9-518" CSG CUT, PULLED & MILLED .... "{FACETO STUB @ 2739' HORIZONTAL LNR. 70° @ 10383' AND 90° @ 11758' 2195' H4-1/2" HES SSSV NIP, ID = 3.813" I ~-~"' c~, ~, ~0, ~: ~..~- H 2668' I~o.o~c~ I-I 2669' r I.-~,~.~svl-I 3020' I IMinimum ID = 3.725" @ 9996' I 4-112" XN NIPPLE (milled to 3.8") IOLD 9-5/8" CSG ITOPOF 4-112" LNR Id 10003' I4-112" 'rBG, 12.6#, L-80, 0.0152 bpf, ID = 3.958" 10008' 9952' 9941' 9975' 9996' 10004' 10008' H7" BAKER S-3 PKR, ID= 3.875" I--14-1/2" x N,=, ID = 3.813" ELMD TT LOGGED 09/24/99 4-1/2" W/LEG, ID = 4.00" I 7" LNR, 26~, L-80 MOD, 0.0383 bpf, ID = 6.276" 10180' PERFORATION SUMMARY REF LOG: ANGLEATTOP PERF: 97 @ 12377' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 4 12377 - 12597 isolated proposed ImT~ I-I ~2s~' I 4-1/2" LNR, 12.6#, L-80, 0.0152 bpf, ID = 3.958" Id 12687' I 11100' IdTop of 3-3/16" Liner [~~ 13325' Id3-3/16 x 2-7/8 X-over I ] 3-3/16"X 2-7/8" crnt'ed and perfedld 14250' DATE REV BY COMMENTS DATE REV BY COMMENTS 05112/g0 ORGINAL COMPLETION '0gl07199 SIDETRACK COMR. ETION 03/14/01 SIS-MH CONVERTED TO CANVAS 03/15/01 SIS-MD FINAL '03/02102 RN/'I'P CORRECTIONS PRUDHOE BAY UNIT WELL: S-24A PERMIT NO: 198-2450 APl No: 50-029-22044-01 SEC 35, T12N, T12E BP Exploration (Alaska) 0 0 z fi' [ i 198-245-0 PRUDHOE BAY UNIT S-24A 50- 029-22044-01 BP EXPLORATION (ALASKA) INC Roll #1: Start: Stop Roll #2: Start Stop MD 12700 TVD 08918 Completion Date: "~)/7~9 Completed Status: lWlNJ Current: WAGIN T Name Interval c 9348 .~ 1 SCHLUM CBL C 9391 ~- 1-5 SCHLUM GR L CBL FINAL 7100-10260 9/4/99 L GR/RES-MD t~J- FINAL 2669-12699 L GR/RES-TVD ~-~ FINAL 2572-8920 INVERTED L USIT R SRVY RPT J FINAL BL(C) 7100-10260 9/4/99 SCHLUM 0-12699. Sent Received T/C/D CH 10/6/99 10/13/99 OH 11/23/99 CH 5 10/6/99 10/13/99 OH 2/5 11/17/99 11/23/99 OH 2/5 11/17/99 11/23/99 OH 5 10/6/99 10/13/99 OH 10/22/99 10/25/99 D Wednesday, June 20, 2001 Page 1 of I 11/17/99 GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 All'N: Sherrie NO. 12940 Company: Field: Alaska Oil & Gas Cons Corem Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Prudhoe Bay (Open Hole) Well Job # Log Description Date BL Sepia CD S-24A1:~ I. x tC- 99356 IMPULSE/GR 990903 1 S-24A / 99356 MD GR-RES 990903 1 1 S-24A~ 99356 TVD GR-RES 990903 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: RECEIVED ;0',/2~ 1999 Alaska Oil & Gas Cons. Commission Schlumberger GeoQuest 3940 Arctic BI 3940 Arctic Blvd, Suite 300 Anchorage, / Anchorage, AK 99503-5711 Al-tN: Sho~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION RECEIVED WELL COMPLETION OR RECOMPLETION REPORT AND L~T 2 5 1999 1. Status of Well Classificat~~i~'~ll$ Commissji; [] Oil [] Gas [] Suspended [] Abandoned [] Service Ap~..h,,nr,,.,:,.~. ' 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 98-245 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22044-01 . I1~1 I 4. Location of well at surface 1633' SNL, 1050' EWL, SEC. 35, T12N, R12E, UM ;" ~'i~'i?'~iiii~?~i?i~i' -~_~~ 9. Unit or Lease Name '- ~11~1~ Prudhoe Bay Unit At top of productive interval i ~__~ 10. Well Number 1843' NSL, 1826' WEL, SEC. 27, T12N, R12E, UM i ~- S-24Ai At total depth ~ 11. Field and Pool 2585' NSL, 3957' WEL, SEC. 27, T12N, R12E, UM : .......- o ~ Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE = e3.77'I ADL 028258 12. Date Spudded8/13/99 I13' Date T'D' Reached ! 14' Date C°mp" Susp" °r Abandl15' Water depth' if OffshOre 16' NO' Of COmpletiOns9/2/99 9/7/99 N/A MSL One 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 19. Directional Survey pO. Depth where SSSV set]21. Thickness of Permafrost 12700 8918 FTI 12599 8928 FT [~Yes [-JNo! (Nipple) 2195' MDI 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, RES, NEU DEN, Sonic, RFT, CBT, USIT ~D I ¢' I ,",,,! Ii/ 23. CASING, LINER AND CEMENTING RECORD L CASING SE-FrING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO'FrOM SIZE CEMENTING RECORD AMOUNT PULLED 20" Insulated Conductor Surface 110' Bcu yds Concrete 13-3/8" 68# L-80 Surface 2668' 17-1/2" 2580 cu ft Arcticset II & III 7" 26# L-80 34' 10180' 8-1/2" 1403 cuft Class 'G' 4-1/2" 12.6#' L-80 10003' 12687' 6" 432 cu ft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-7/8" Gun Diameter, 4 spf 4-1/2", 12.6#, L-80 10008' 9952' MD TVD MD TVD 12377 - 12597' 8950' - 8928' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 80 Bbls of Diesel 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) September 25, 1999 I Water & Gas Injection Date of Test Hours Tested PRODUCTION FOR OIL-EEL GAS-MCF WATER-EEL CHOKE SIZE I GAS-OIL RATIO I TEST PERIOD Flow Casing Pressure CALCULATE OIL-EEL GAS-MCF WATER-EEL OIL GRAViTY-APl (CORR) Tubing D 24-HOUR I3Z~.SS. RATE CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered and Marker Name Depth Depth gravity, GOR, and time of each phase. Sag River 10182' 8723' Shublik 10232' 8765' Sadlerochit / Zone 4B 10428' 8863' Zone 4A 11510' 8983' Zone 4A 11752' 9008' Zone 4A 12232' 8967' Sadlerochit 12685' 8920' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I herebYsigned certify that the foregoipg..,~~is, true__and correct to the best of my knowledge/~:~' '(~ TerrieHubble Title Technical Assistant III Date I0 S-24Ai 98-245 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility Date/Time 07 Aug 99 08 Aug 99 01:30 PBS Pad Progress Report Well S-24A Page Rig Nabors 9ES Date 1 08 September 99 04:30-06:00 04:30-05:00 05:00 05:00-06:00 06:00-11:00 06:00-11:00 11:00 11:00-12:30 11:00-12:30 12:30 12:30-13:30 12:30-13:30 13:30 13:30-16:30 13:30-14:00 14:00 14:00-16:30 16:30 16:30-19:30 16:30-17:30 17:30 17:30-19:30 19:30 19:30-21:30 19:30-21:30 21:30 21:30-02:00 21:30-01:30 Duration 1-1/2 hr 1/2hr lhr 5hr 5hr 1-1/2 hr 1-1/2 hr lhr lhr 3hr 1/2 hr 2-1/2 hr 3hr lhr 2hr 2hr 2hr 4-1/2 hr 4hr Activity Move rig Held safety meeting Completed operations Rig moved 10.00 % Level and spot matting boards at cellar location. Lay Herculite. Spot sub, mud pits and shop. Set cuttings tank. Berm containment under rig and hook up lines. Move rig (cont...) Rig moved 100.00 % (cont...) Level and spot matting boards at cellar location. Lay Herculite. Spot sub, mud pits and shop. Set cuttings tank. Berm containment under rig and hook up lines. At well location - Cellar Rig accepted at 1100 hrs 8/7/99. Fluid system Fill pits with Fresh water Fill pits. R/U secondary annular valve on casing spool and hook up lines to circ freeze protect from well. Completed operations Wellhead work Removed Hanger plug Pulled BPV w/lubricator. Equipment work completed Fluid system Held safety meeting Held pre-spud meeting. Completed operations Circulated at 4512.0 ft Finished R/U and circulated freeze protect diesel from well. Hole displaced with Fresh water - 100.00 % displaced Wellhead work Installed Hanger plug Set TWC and tested to 1000 psi from below. Tested tree to 5000 psi. Equipment work completed Removed Xmas tree N/D tree and adapter. Function lock down screws on tubing hanger. Equipment work completed Nipple up BOP stack Installed BOP stack Equipment work completed Test well control equipment Tested BOP stack R/U and tested BOP's. Hydril 250/3500 psi. Pipe rams, blind rams, choke and kill line valves, floor safety valves, choke to 250/4000 psi. Unable to complete test on lower pipe rams, xo in way. Test witnessed by C. Scheve, AOGCC. Pressure test completed successfully - 4000.000 psi Progress Report Facility PBS Pad Well S-24A Page 2 Rig Nabors 9ES Date 08 September 99 Date/Time 01:30-02:00 02:00 02:00-06:00 02:00-03:00 03:00 03:00-06:00 06:00 06:00-06:30 06:00-06:30 06:30 06:30-08:00 06:30-07:30 07:30 07:30-08:00 08:00 08:00-14:30 08:00-10:30 10:30 10:30-11:00 11:00 11:00-13:00 13:00 13:00-14:30 14:30 14:30-15:30 14:30-15:30 15:30 15:30-03:30 15:30-17:30 17:30 17:30-18:30 18:30 18:30-23:00 23:00 23:00-01:00 Duration 1/2 hr 4 hr lhr 3hr 1/2 hr 1/2 hr 1-1/2 hr lhr 1/2 hr 6-1/2 hr 2-1/2 hr 1/2 hr 2hr 1-1/2 hr lhr lhr 12hr 2hr lhr 4-1/2 hr 2hr Activity Retrieved Hanger plug Equipment work completed Pull Single completion, 4-1/2in O.D. Pulled Tubing on retrieval string to 24.0 ft M/U landing jt and BOLDS. Pulled tubing to floor. L/D landing jt and tubing hanger. Completed operations Laid down 4512.0 ft of Tubing L/D tubing at report time. Installing thread protectors to salvage tubing. 107 joints laid out Recovered 107 jts tbg plus XN nipple plus 20.50' cut it. Pull Single completion, 4-1/2in O.D. (cont...) Removed Tubing handling equipment Equipment work completed Test well control equipment Tested Bottom ram P/U test jt and tested lower pipe ram to 250/4000 psi. R/D equipment. Pressure test completed successfully - 4000.000 psi Installed Wear bushing Eqpt. work completed, running tool retrieved 4-1/2in. Drillpipe workstring run Ran Drillpipe in stands to 3020.0 ft PFU EZSV bridge plug and RIH. At Setting depth: 3020.0 ft Installed Bridge plug Set and released form EZSV. Set 25K down to confirm set. Equipment work completed Circulated at 3020.0 ft Pump 30 bbls water spacer and displaced to 9.6 ppg mud. 10 bpm, 375 psi. Mixed and spotted 18 ppg milling pill to 2820'. Hole displaced with Water based mud - 100.00 % displaced Pulled Drillpipe in stands to 0.0 ft At Surface: 0.0 ft Planned maintenance Serviced Block line Line slipped and cut BHA run no. 1 Made up BHA no. 1 P/U section milling BHA. BHA no. 1 made up R.I.H. to 2799.0 ft Locate casing collar at 2799. x"~l Stopped · To correlate depth Milled Casing at 2794.0 ft P/U 6' above collar and begin section milling @ 2794'. Milled to 2797'. Recovered 15(D metal. At Kick off depth: 2797.0 ft Circulated at 2797.0 ft Mix and pump sweep. Circ 14 bpm, 1325 psi. Facility PBS Pad Duration 1 hr 1-1/2 hr Date/Time 09 Aug 99 01:00 01:00-02:00 02:00 02:00-03:30 1 hr 1 hr 03:30 03:30-04:30 03:30-04:30 04:30 04:30-06:00 04:30-05:00 05:00 05:00-06:00 1-1/2 hr 1/2 hr 1 hr 1 hr 05:00-06:00 2 hr 2 hr 06:00-08:00 06:00-08:00 2 hr 2 hr 08:00 08:00-10:00 08:00-10:00 1 hr 1 hr 10:00 10:00-11:00 10:00-11:00 2-1/2 hr 2-1/2 hr 11:00 11:00-13:30 11:00-13:30 1 hr 1/2 hr 1/2 hr 1 hr 1/2 hr 13:30 13:30-14:30 13:30-14:00 14:00 14:00-14:30 14:30 14:30-15:30 14:30-15:00 Progress Report Well S-24A Page 3 Rig Nabors 9ES Date 08 September 99 Activity Hole swept with slug - 400.00 % hole volume Pulled out of hole to 673.0 ft At BHA Pulled BHA Stand back HWDP and DC's. L/D jars and section mill. BHA Stood back Fluid system Circulated at 26.0 ft R/U and circ to clean stack. Attempted to circulate thru 13-3/8" annulus, pressure to 400 psi, 12.5 ppg EMW, no circulation. Stopped · To change handling equipment Wellhead work Removed Wear bushing Equipment work completed Removed Seal assembly Pulling 9-5/8" packoff at report time. Removed Seal assembly Pull 9-5/8" packoff thru stack. Packoff damaged, had to modify running tool. Recovered packoff. Wellhead work (cont...) Removed Seal assembly (cont...) Pull 9-5/8" packoff thru stack. Packoff damaged, had to modify running tool. Recovered packoff. Equipment work completed Pull Casing, 9-5/8in O.D. Pulled Casing on retrieval string to 25.0 fi PFU 9-5/8" spear and packoff assembly. Catch casing below hanger. Worked pipe to 350K, 400 psi on pump. 2' pipe movement at surface, no circulation. Stopped · To flowcheck well Well control Flow check Gas breaking out of crude/diesel freeze protect in annulus. Closed annular and took gas expansion to gas buster. Well unloaded 37 bbls fluid. No shut in pressure. Lubricate well, took 37 bbls to fill. Observed well static Pull Casing, 9-5/8in O.D. Worked stuck pipe at 2797.0 fi Work pipe to 400K. Pressure to 600 psi attempting to bread circulation. Unable to free casing. Release spear. Aborted attempts to work Casing free at 2797.0 ft Wellhead work Installed Seal assembly Eqpt. work completed, running tool retrieved Installed Wear bushing Eqpt. work completed, running tool retrieved Fluid system Reverse circulated at 2797.0 ft Attempted to circulate down casing annulus. Facility Date/Time 10 Aug 99 Progress Report PBS Pad Well S-24A Page 4 Rig Nabors 9ES Date 08 September 99 15:00 15:00-15:30 15:30 15:30-21:00 15:30-16:00 16:00 16:00-17:00 17:00 17:00-18:00 18:00 18:00-19:30 19:30 19:30-20:30 20:30 20:30-21:00 21:00 21:00-21:30 21:00-21:30 21:30 21:30-23:00 21:30-23:00 23:00 23:00-23:30 23:00-23:30 23:30 23:30-06:00 23:30-00:30 00:30 00:30-03:00 03:00 03:00-03:30 03:30 03:30-06:00 03:30-06:00 06:00-13:00 Duration 1/2 hr 5-1/2 hr 1/2 hr 1 hr 1 hr 1-1/2 hr 1 hr 1/2 hr 1/2 hr 1/2 hr 1-1/2 hr 1-1/2 hr 1/2 hr 1/2 hr 6-1/2 hr 1 hr 2-1/2 hr 1/2 hr 2-1/2 hr 2-1/2 hr 7 hr Activity casing. Stopped: To hold safety meeting Held safety meeting Held Technical Limit/Safety Meeting with T. Bunch and D. Abert. Completed operations BHA run no. 2 Made up BHA no. 2 PFLI hydraulic multicutter tool. BHA no. 2 made up R.I.H. to 2659.0 ft At 13-3/8in casing shoe To cutting point 10' above 13-3/8" casing shoe. Cut Casing at 2659.0 ft Cut casing with multicutter. Completed operations Circulated at 2659.0 ft Open 13-3/8" annular valve and allow 9.6 ppg mud to U-tube crude/diesel freeze protect to outside tank. Recovered 100 bbls freeze protect. Hole displaced with Water based mud - 100.00 % displaced S/I to allow oil/gas/mud mixture to separate. Pulled out of hole to 654.4 ft At BHA Pulled BHA L/D casing cutter. BHA Stood back Wellhead work Removed Wear bushing Equipment work completed Fluid system Circulated at 2659.0 ft Closed blind rams and circulated thru cut in 9-5/8" casing. Obtained bottoms up (100% annulus volume) Wellhead work Retrieved Seal assembly Pulled 9-5/8" packoff. Equipment work completed Pull Casing, 9-5/8in O.D. Pulled Casing on retrieval string to 40.0 ft RIH. Latch casing w/spear. Pulled to floor, 145K. Released spear. Fish at surface Rigged up Casing handling equipment Equipment work completed Circulated at 2659.0 ft Pump pill. Heavy slug spotted downhole Laid down Casing of 1200.0 ft Lay down 9-5/8" casing at report time. Laid down Casing of 1200.0 ft L/D 9-5/8" casing. Recovered 67jts + 15' cut jr. Recovered 11 turbulators. Pull Casing, 9-5/8in O.D. (cont...) Facility Date/Time 11 Aug 99 Progress Report PBS Pad Well S-24A Rig Nabors 9ES Page 5 Date 08 September 99 06:00-11:00 11:00 11:00-13:00 13:00 13:00-22:00 13:00-14:30 14:30 14:30-15:30 15:30 15:30-17:30 17:30 17:30-19:30 19:30 19:30-20:30 20:30 20:30-21:30 21:30 21:30-22:00 22:00 22:00-22:30 22:00-22:30 22:30 22:30-23:00 22:30-23:00 23:00 23:00-06:00 23:00-00:30 00:30 00:30-01:30 01:30 01:30-06:00 01:30-06:00 06:00-04:30 06:00-16:30 16:30 16:30-17:30 17:30 Duration 5 hr 2 hr 9 hr 1-1/2 hr 1 hr 2 hr 2 hr 1 hr 1 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 7 hr 1-1/2 hr 1 hr 4-1/2 hr 4-1/2 hr 22-1/2 hr 10-1/2 hr 1 hr Activity Laid down 2659.0 ft of Casing (cont...) L/D 9-5/8" casing. Recovered 67 jts + 15' cut jt. Recovered 11 turbulators. 67 joints laid out Rigged down Casing handling equipment R/D and clean rig floor. Equipment work completed BHA run no. 3 Made up BHA no. 3 Fishing BHA, spear. BHA no. 3 made up R.I.H. to 2659.0 ft At Top of fish: 2659.0 ft Fished at 2659.0 ft Latched fish. Jarred 225K to 275K. Attempted to pump. No-go. Good jalTing action. Released fish Abandoned effort to pull fish free. Serviced Top drive Inspected derrick and top drive. Repaired sheared bolts in top drive cover plate. Equipment work completed Pulled out of hole to 700.0 ft At BHA Pulled BHA L/D fishing spear, bumper sub, accelerator jars. BHA Stood back Removed Drillfloor / Derrick Clear floor, P/U Baker tools. Equipment work completed Planned maintenance Serviced Top drive Equipment work completed Wellhead work Installed Wear bushing Eqpt. work completed, running tool retrieved BHA run no. 4 Made up BHA no. 4 Milling BHA. BHA no. 4 made up R.I.H. to 2659.0 ft At Top of fish: 2659.0 ft Milled Casing at 2670.0 ft Milling ahead, 4.5 '/hr. 2670' at report time. Milled Casing at 2670.0 ft Milled casing to 2726'. S/D to make a connection. BHA run no. 4 (cont...) Milled Casing at 2726.0 ft (cont...) Milled casing to 2726'. S/D to make a connection. Began precautionary measures Investigated pressure change Wad of mill cuttings backing up flowline and bell nipple. Clean same. Completed operations Facility Date/Time 12 Aug 99 Progress Report PBS Pad Well S-24A Page 6 Rig Nabors 9ES Date 08 September 99 17:30-20:00 20:00 20:00-20:30 20:30 20:30-23:30 23:30 23:30-02:00 02:00 02:00-03:00 03:00 03:00-04:30 04:30 04:30-06:00 04:30-05:30 05:30 05:30-06:00 06:00 06:00-09:15 06:00-08:00 08:00 08:00-08:15 08:15 08:15-08:30 08:30 08:30-09:00 09:00 09:00-09:15 09:15 09:15-10:00 09:15-10:00 10:00 10:00-13:00 10:00-10:30 10:30 10:30-12:00 Duration 2-1/2 hr 1/2 hr 3 hr 2-1/2 hr 1 hr 1-1/2 hr 1-1/2 hr 1 hr 1/2 hr 3-1/4 hr 2 hr 1/4 hr 1/4 hr 1/2 hr 1/4 hr 3/4 hr 3/4 hr 3 hr 1/2 hr 1-1/2 hr Activity Milled Casing at 2739.0 ft Finished milling 70' window for kick off. At Window: 2739.0 ft Circulated at 2739.0 ft Circulate sweep. Flowline plugged off before sweep returns. Stopped: To service drilling equipment Rigged down Flowline Break flowline apart and unplug flowline. Cuttings ball plugging flowline. Equipment work completed Circulated at 2739.0 ft Obtained clean returns - 400.00 % hole volume Pump sweeps, clean metal from hole. Pulled out of hole to 672.0 ft At BHA Pulled BHA L/D mills. 20% wear on mill. BHA Stood back 4in. Drillpipe workstring run Ran Drillpipe in stands to 2669.0 fl RIH w/muleshoe. At 13-5/8in casing shoe Washed to 2820.0 ft Wash to 2820' at report time. (Top of 18 ppg pill.) At Setting depth: 2820.0 ft Bottom of cement plug. 4in. Drillpipe workstring run (cont...) Circulated at 2820.0 ft Hole swept with slug - 200.00 % hole volume Pulled Drillpipe in stands to 2615.0 ft At top of check trip interval Ran Drillpipe in stands to 2820.0 ft No resistance. Stopped: To circulate Circulated at 2820.0 ft Stopped: To hold safety meeting Held safety meeting Held PJSM w/Dowell. Completed operations Cement: Kickoff plug Mixed and pumped slurry - 65.000 bbl Pump 5 bbls H20. Test lines to 3000 psi. Pump 35 bbls H20, 65 bbls cmt, 3 bbls H20. Displace with 17.5 bbls 9.6 ppg mud. Cement pumped CIP 1000 hrs 8/12/99. 4in. Drillpipe workstring run Pulled Drillpipe in stands to 2150.0 ft Stopped: To circulate Circulated at 2150.0 ft Circulate and clean hole. Got 2 bbls cmt contaminated mud to surface. Facility Date/Time 13 Aug 99 Progress Report PBS Pad Well S-24A Rig Nabors 9ES Page 7 Date 08 September 99 12:00 12:00-13:00 13:00 13:00-14:30 13:00-13:30 13:30 13:30-14:00 14:00 14:00-14:30 14:30 14:30-17:00 14:30-15:00 15:00 15:00-17:00 17:00 17:00-06:00 17:00-19:00 19:00 19:00-20:00 20:00 20:00-20:30 20:30 20:30-22:30 22:30 22:30-23:00 23:00 23:00-06:00 06:00-12:00 06:00-07:00 07:00 07:00-10:00 10:00 10:00-11:00 11:00 11:00-12:00 12:00 12:00-18:00 12:00-17:00 17:00 17:00-18:00 Duration 1 hr 1-1/2 hr 1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 2 hr 13hr 2 hr 1 hr 1/2 hr 2 hr 1/2 hr 7 hr 6 hr 1 hr 3 hr 1 hr 1 hr 6 hr 5 hr 1 hr Activity Obtained clean returns - 150.00 % hole volume Pulled Drillpipe in stands to 0.0 ft Pump pill and POH. L/D muleshoe. At Surface: 0.0 ft Wellhead work Removed Wear bushing Equipment work completed Circulated at 25.0 ft Washed stack with perforated joint. Functioned BOP's. Stopped: To service drilling equipment Installed Wear bushing Eqpt. work completed, running tool retrieved Planned maintenance Serviced Drillfloor / Derrick Cleared and cleaned rig floor. Equipment work completed Serviced Rotary table Level rig. Settling moved rig off center. Equipment work completed BHA run no. 5 Made up BHA no. 5 BHA no. 5 made up R.I.H. to 2364.0 ft RIH to 2100'. Washed to 2364', TOC. Observed 20.00 klb resistance Drilled cement to 2397.0 ft Stopped to test casing Circulated at 2397.0 ft Obtained clean returns - 150.00 % hole volume Cement contaminated mud. Tested Casing - Via annulus Tested 13-3/8" casing to 2500 psi for 30 min, bled off 178 psi, OK. Pressure test completed successfully - 2500.000 psi Drilled cement to 2610.0 ft Drilling hard cement. (Very hard) 30K wob, 100 rpm, 650 gpm. Drilling cement at report time. BHA run no. 5 (cont...) Drilled cement to 2669.0 ft Finished drill cement to 13-3/8" csg shoe. Completed operations Circulated at 2669.0 ft Circ and cond cement contaminated mud. Obtained clean returns - 300.00 % hole volume Pulled out of hole to 932.0 ft At BHA Pulled BHA L/D steel DC's, stood back HWDP. BHA Laid out BHA run no. 6 Made up BHA no. 6 BHA no. 6 made up R.I.H. to 2400.0 ft Facility Date/Time PBS Pad Duration 18:00 18:00-19:00 18:00-18:30 18:30 18:30-19:00 19:00 19:00-06:00 19:00-22:00 1 hr 1/2 hr 1/2 hr llhr 3 hr 22:00 22:00-03:00 14 Aug 99 03:00 03:00-04:30 04:30 04:30-05:00 05:00 05:00-06:00 06:00-06:00 06:00-06:30 06:30 06:30-08:00 08:00 08:00-09:00 09:00 09:00-10:00 10:00 10:00-11:00 5 hr 1-1/2 hr 1/2 hr 1 hr 24hr 1/2 hr 1-1/2 hr 1 hr 1 hr 1 hr 11:00 11:00-21:00 21:00 21:00-22:00 22:00 22:00-23:00 10hr 1 hr 1 hr Progress Report 23:00 23:00-00:30 Well S-24A Page 8 Rig Nabors 9ES Date 08 September 99 1-1/2 hr Activity Began precautionary measures Planned maintenance Serviced Block line Line slipped Serviced Top drive Equipment work completed BHA run no. 6 Rigged up Logging/braided cable equipment Held PJSM. R/U Schlumberber wireline sheave and side entry sub. RIH w/gyro and latch up. Equipment work completed Drilled to 2745.0 ft Time drilled to 2745' kicking off cement plug. Build rate unacceptable - Unable to orientate string POH w/wireline to rotate. Removed Logging/braided cable equipment POH and R/D Schlumberger/Gyrodata. Equipment work completed Drilled to 2775.0 ft Rotate 30'. Build rate unacceptable - Unable to orientate string Planned rotation. Rigged up Logging/braided cable equipment R/U Schlumberger and Gyrodata. RIH. Prepare to slide ahead. BHA run no. 6 (cont...) Drilled to 2815.0 ft Slide from 2775' to 2815'. Reached planned end of run - Directional objective met Rigged down Survey wireline unit POH w/wireline and stand back Schlumberger. Equipment work completed Drilled to 2904.0 ft L/D side entry sub. Drilled ahead to 2904'. Stopped: To take survey Rigged up Survey wireline unit R/U Schlumberger and ran gyro. Equipment work completed Rigged down Survey wireline unit R/D and released Schlumberger and Gyrodata. Work completed, equipment laid out Drilled to 3745.0 ft Drilled ahead sliding as required for angle and direction. AST=5.5 hrs ART=3.0 hrs Began precautionary measures Circulated at 3745.0 ft Circulated sweep. Obtained clean returns - 100.00 % hole volume Pulled out of hole to 2600.0 ft Hole swabbing, backream as necessary. At top of check trip interval R.I.H. to 3373.0 ft RIH. Tight at 3373'. Appeared to be pushing boulder downhole. Hung up in slide interval at 3373'. · Orient ~-~' attempt to ..... ~- "~-' °:-' .... '-~' '~: '- ~llU W~Lall unu. o,ucuau~wu Facility PBS Pad Date/Time Duration 15 Aug 99 00:30 00:30-06:00 5-1/2 hr 06:00-12:30 6-1/2 hr 06:00-07:00 1 hr 16 Aug 99 07:00 07:00-08:30 1-1/2 hr 08:30 08:30-12:30 4 hr 12:30 12:30-14:00 1-1/2 hr 12:30-14:00 1-1/2 hr 14:00 14:00-02:00 12 hr 14:00-18:00 4 hr 18:00 18:00-19:00 1 hr 19:00 19:00-21:00 2 hr 21:00 21:00-21:30 1/2 hr 21:30 21:30-22:00 1/2 hr 22:00 22:00-02:00 4 hr 02:00 02:00-04:00 2 hr 02:00-04:00 2 hr 04:00 04:00-06:00 2 hr 04:00-06:00 2 hr 04:00-06:00 2 hr Progress Report 06:00-00:00 18 hr 06:00-17:00 11 hr Well S-24A Page Rig Nabors 9ES Date 9 08 September 99 Activity side. Observed 30.00 klb resistance Drilled to 3838.0 ft Drilling ahead at report time. ART=2.0 hrs AST=l.0hrs BHA run no. 6 (cont...) Drilled to 3960.0 ft Drilled ahead to 3960'. Hit top Ugnu sand, blinding off shakers. Reduce circ rate, gas cut mud. Stopped · To circulate Circulated at 3960.0 ft Circ at reduced rate, sand blinding off shakers. Gradually bring pumps back to 600 gpm, circ to clean hole. Gas cut mud and oil in sand. Obtained clean returns - 130.00 % hole volume Drilled to 4304.0 ft Control drill ahead. Max penetration rate 150 fpm. Liner failed - Abort operation Repair Repaired Liner Change out swab and liner. Equipment work completed BHA run no. 6 Drilled to 4675.0 ft ART=2.25 hrs AST=0.5 hrs Started scheduled wiper trip: due to Footage drilled Circulated at 4675.0 ft Pump hi-visc sweep. Obtained clean returns - 110.00 % hole volume Pulled out of hole to 2610.0 ft Some minor swabbing, tight at 3209'. At 13-3/8in casing shoe Serviced Top drive Equipment work completed R.I.H. to 4675.0 ft No problems RIH. On bottom Drilled to 5010.0 ft ART=3.25 AST=0 Mud pumps failed - Circulate Repair Repaired Mud pump power end Inspect drive chain and sprocket, excessive noise. Equipment work completed BHA run no. 6 Drilled to 5200.0 ft Drill ahead rotating and sliding as required for directional control. Drilled to 5200.0 ft AST=0.75 hrs ART=6.25 hrs Drilled to top Seabee shale interval. 33.5 hrs on bit. BHA run no. 6 (cont...) Drilled to 5982.0 ft (cont...) AST=0.75 hrs ART=6.25 hrs Drilled to top Seabee shale: 111 I.[.,l V~[l. Jd.J Ult. Facility Date/Time 17 Aug 99 18 Aug 99 i PBS Pad 17:00 17:00-18:30 18:30 18:30-20:30 20:30 20:30-00:00 00:00 00:00-05:00 00:00-00:30 00:30 00:30-04:30 04:30 04:30-05:00 05:00 05:00-06:00 05:00-06:00 06:00 06:00-06:00 06:00-08:30 08:30 08:30-09:30 09:30 09:30-11:00 11:00 11:00-12:00 12:00 12:00-13:00 13:00 13:00-06:00 06:00-06:00 06:00-01:00 -- r Progress Report Well S-24A Page 10 Rig Nabors 9ES Date 08 September 99 Duration Activity 1-1/2 hr 2 hr 3-1/2 hr 5 hr 1/2 hr 4 hr 1/2 hr 1 hr 1 hr 24 hr 2-1/2 hr 1 hr 1-1/2 hr 1 hr 1 hr 17hr Reached planned end of run - Maximum hours on bit Circulated at 5982.0 ft Circ sweep. Hole swept with slug - 150.00 % hole volume Pulled out of hole to 942.0 ft At BHA Pulled BHA Stand back HWDP. L/D BHA. Clear floor. BHA Stood back Test well control equipment Retrieved Wear bushing Equipment work completed Tested BOP stack R/U and tested annular to 250/3500 psi. Tested pipe rams, blind rams, choke and kill line valves, choke, and floor safety valves to 250/4000 psi. Performed accumulator test. Witness of test waived by L. Grimaldi, AOGCC. Pressure test completed successfully - 4000.000 psi Installed Wear bushing Eqpt. work completed, running tool retrieved Planned maintenance Serviced Top drive Service top drive. Break connections on top drive subs. Equipment work completed BHA run no. 7 Made up BHA no. 7 BHA no. 7 made up Flow check Began precautionary measures Flow test MWD @ 550 gpm = 1350 psi. RIH to 2918. Fill DP. Serviced Block line Line slipped and cut Slip 40', cut 80' of drlg line. Inspect brake system. R.I.H. to 5794.0 ft On bottom Functioned downhole tools at 5794.0 fl Began precautionary measures Check shot @ 5794. Ream last std. to bottom. Establish ECD baselines. Cycle Andergage: Full gauge = 3000 psi @ 580 gpm, undergauge = 2885 psi @ 580 gpm. Drilled to 7473.0 ft AST=l.83 hrs, ART= 8.57 hrs, Up wt. = 185, dn = 130, Rot = 155 klb. Torq on = 9/10, off = 6/8 kft-lbs. 24 hr 19hr No Drag. No Losses. Mud weight raised to 10.6 ppg. BHA run no. 7 (cont...) Drilled to 8220.0 ft Facility PBS Pad Date/Time 19 Aug 99 01:00 01:00-03:00 03:00 03:00-06:00 03:00-06:00 06:00-23:00 06:00-08:30 08:30 08:30-09:00 09:00 09:00-09:30 09:30 09:30-13:00 13:00 13:00-16:30 16:30 16:30-20:30 20:30 20:30-22:30 22:30 22:30-23:00 23:00 23:00-06:00 23:00-23:30 Progress Report Well S-24A Page 11 Rig Nab@rs 9ES Date 08 September 99 Duration 2 hr 3 hr 3 hr Activity probably due to BHA geometry and low flow rate. Reached planned end of run - Geological Circulated at 8220.0 ft Obtained bottoms up (100% annulus volume) Sweep hole clean. Flowcheck well. Pulled out of hole to 5803.0 ft POOH wet. Worked tight spots and back ream from 6370 to 5803'. Clean floor Pulled out of hole to 5803.0 ft POOH- Tight @ 6,370, 6,200 and 5,982'. Currently pulling thru West Sak w/25 klbs o/pull @ 5,803'. Wash thru spots @ 5,982' & 5,820'. 17 hr 2-1/2 hr Top Kuparuk = 7,804', Bottom @ 8,008'. BHA run no. 7 (cont...) Pulled out of hole to 5803.0 ft (cont...) POOH- Tight @ 6,370, 6,200 and 5,982'. Currently pulling thru West Sak w/25 klbs o/pull @ 5,803' Wash thru spots @ 5,982' & 5,820'. 1/2 hr 1/2 hr 3-1/2 hr 3-1/2 hr 4 hr 2 hr 1/2 hr 7 hr 1/2 hr Top Kuparuk = 7,804', Bottom @ 8,008'. Stopped: To service drilling equipment Stopped to slip drlg. line. Serviced Block line Slip 40' of drlg line. Equipment work completed Serviced Top drive Equipment work completed R.I.H. to 8220.0 ft Fill D.P., ream last stand to bottom. <No problems> On bottom Circulated at 8220.0 ft Circulate and condition mud. Pump 2 sweeps, clean hole for logging operations. Obtained clean returns - 200.00 % hole volume Pulled out of hole to 938.0 ft POOH. Tight spots and slight swabbing from 7959' to 7550' (top HRZ). POOH to shoe. <No problems> Monitor well at shoe, POOH to BHA. No losses, no gains. At BHA Pulled out of hole to 0.0 fl Stood back BHA, down load MWD on floor before standing back. Std back remainder of BHA. At Surface: 0.0 ft Stabilizer and bit balled up. Removed Drillstring handling equipment Clean and clear floor to prepare for logging operations. Equipment work completed Electric wireline work Held safety meeting PJSM - r/u Schlumberger wireline, radioactive source. Facility PBS Pad Progress Report Well S-24A Page 12 Rig Nabors 9ES Date 08 September 99 Date/Time 23:30 23:30-01:00 20 Aug 99 01:00 01:00-05:00 Duration 1-1/2 hr 4 hr Activity Completed operations Rigged up sub-surface equipment - Cable RFU schlumberger wireline. Equipment work completed Conducted electric cable operations RIH w/wireline log #1: LEH-QY/DTC-H/HILTB-FTB/D 05:00 05:00-06:00 06:00-09:00 06:00-09:00 09:00 09:00-02:30 09:00-10:00 10:00 10:00-11:00 11:00 11:00-12:00 12:00 12:00-13:00 13:00 13:00-15:30 15:30 15:30-17:00 17:00 17:00-18:30 18:30 18:30-21:30 21:30 1 hr 3 hr 3 hr 17-1/2 hr 1 hr 1 hr 1 hr 1 hr 2-1/2 hr 1-1/2 hr 1-1/2 hr 3 hr T-270/GPIT-A/B/AH-SFT-270/DSST-B/AIT-I-UBNS-NG= 116.6' Unable to work past 7350'. poh and lay down DTA-A/AH-SET-270/GPit-A/B/AH-SFT-270/DSST-B. Completed misrun with Formation logs to 7350.0 ft Conducted electric cable operations RIH w/wireline logs at report time. Electric wireline work (cont...) R.I.H. to 7124.0 ft Observed 0.00 klb resistance Unable to work past 7124'. POOH, 1/d logs, r/d Schlumberger. BHA run no. 8 Rigged up Drillstring handling equipment Change out equipment and prep BHA for clean out run. Equipment work completed Made up BHA no. 8 BHA no. 8 made up R.I.H. to 2669.0 ft At 13-3/8in casing shoe Circulated at 2669.0 ft Began precautionary measures Stage up pumps to 400 gpm, 1700 psi. Circulate and condition mud. R.I.H. to 5500.0 ft No problems Began precautionary measures Stage up pumps to 400 gpm and 1700 psi. Circulate and condition mud. R.I.H. to 7100.0 ft Began precautionary measures Reamed to 8220.0 ft Precuationary ream to bottom @ 80 RPM, 450 GPM/ 2100 psi. Some restriction @ 7,510', 7,636' and 7,680'. On bottom Circulated at 8220.0 ft Hole swept with slug - 100.00 % hole volume ..... e sand clay coirdng ,~v~ -'--' .... Facility Date/Time 21 Aug 99 PBS Pad 21:30-00:00 Progress Report 00:00 Well S-24A Page 13 Rig Nabors 9ES Date 08 September 99 00:00-01:00 01:00 01:00-02:30 02:30 02:30-06:00 02:30-03:00 03:00 03:00-03:30 03:30 03:30-04:45 04:45 04:45-06:00 06:00 06:00-06:00 06:00-10:00 10:00 10:00-12:00 12:00 12:00-12:15 12:15 12:15-13:30 13:30 13:30-16:30 16:30 16:30-04:00 22 Aug 99 04:00 04:00-06:00 06:00-12:30 Duration 2-1/2 hr 1 hr 1-1/2 hr 3-1/2 hr 1/2 hr 1/2 hr 1-1/4 hr 1-1/4 hr 24 hr 4 hr 2 hr 1/4 hr 1-1/4 hr 3 hr 11-1/2 hr 2 hr 6-1/2 hr Activity returns. Monitor well. Pump dry job. Stage up Pulled out of hole to 2669.0 ft POOH, slight swabbing in Kuparuk, pulls @ 30 klbs.Lubricate through Kuparuk, HRZ fine. At 13-3/8in casing shoe Monitor well. Pulled out of hole to 861.0 ft At BHA Pulled BHA BHA Stood back Stabilisers balled up with clay. Electric wireline work Held safety meeting PJSM -- r/u Schlumberger. Completed operations Rigged up Logging/braided cable equipment R/U Schlumberger. Equipment work completed R.I.H. to 7200.0 ft Observed 0.00 klb resistance Made several unsuccessful attempts to get logs past 7200'. Aborted operation. Pulled out of hole to 0.0 ft POOH w/wireline logs. At Surface: 0.0 ft Electric wireline work (cont...) Rigged up Logging/braided cable equipment M/U DP conveyed RFT tools on ground. Rewire head and p/u tools. Test wet connect for DP conveyed logs. Hang sheave at derrick board. Equipment work completed Conducted electric cable operations RIH w/RFT on DP. Began precautionary measures Crew change. Held safety meeting PJSM -- cut & slip drlg line. Completed operations Serviced Block line Cut and slip drlg line. Adjust brakes. Service top drive. Equipment work completed R.I.H. to 6500.0 ft Began precautionary measures Rigged up sub-surface equipment - Other sub-surface equipment r/u side entry sub. RIH w/wireline, latch up same. Ran into tight spot from 7250' to 7375' (pushed 1200 lbs). Work as directed by wireline personnel. Got all required pressures. Got 1 of 2 required samples. The one gallon sample vessel did not func. Equipment work completed Pulled out of hole to 6500.0 ft Remove wet connect and pull wireline. Electric wireline work (cont...) Facility Date/Time 23 Aug 99 PBS Pad 06:00-07:00 07:00 07:00-10:00 10:00 10:00-12:30 12:30 12:30-06:00 12:30-16:30 16:30 16:30-19:30 19:30 19:30-20:30 20:30 20:30-21:30 21:30 21:30-22:30 22:30 22:30-06:00 06:00-06:00 06:00-09:30 09:30 09:30-11:00 11:00 11:00-14:00 14:00 14:00-14:30 Progress Report Well S-24A Page 14 Rig Nabors 9ES Date 08 September 99 Duration 1 hr 3 hr 2-1/2 hr 17-1/2 hr 4 hr 3 hr 1 hr 1 hr 1 hr 7-1/2 hr 24 hr 3-1/2 hr 1-1/2 hr 3 hr 1/2 hr Activity Pulled out of hole to 6500.0 fl At Top of reservoir' 6500.0 ft Pull wire and rig down same. Flow check Began precautionary measures Check for flow, pump pill and POOH. Rigged down sub-surface equipment - Toolstring L/D Schlumberger tools and rig down sheave from derrick. Lay down steel DC's. Equipment work completed BHA run no. 9 R.I.H. to 2669.0 ft RIH w/BHA ~O. Shallow test MWD at 540 gpm. P/U pipe from shed, rabbit off skate. At 13-3/8in casing shoe Circulate mud to break gels. R.I.H. to 8020.0 ft RIH out of derrick to 5500'. Circulate and condition mud. RIH to 5783', check shot, RIH. Began precautionary measures Reamed to 8220.0 ft Ream last 200' to bottom. Log last 30' @ 150'/hr. Completed precautionary measures Logging AFE 3A0050 ended at 20:30 on August 22, began at 01:00 August 19. Incremental service ticket costs over & above rig/support services are: LWD Resistivity = $18,485 Schlumberger Wireline = $142,805 Drilled to 8301.0 ft Liner failed - Work string Serviced Liner Service #1 pump swab and liner. Equipment work completed Drilled to 8804.0 ft Drill ahead to 8804'. No drag, no losses, ECD steady. BHA run no. 9 (cont...) Drilled to 8955.0 ft Control drill from 8804' to 8955'. Began precautionary measures Circulated at 8955.0 ft Circulate sweep surface to surface. Cuttings returned with slug. Check for flow. Hole displaced with Water based mud - 100.00 % displaced Backreamed to 7500.0 ft Short trip to 7500. Shales OK.. Tight from 8166-8055, wipe. Pull tight through Kuparuk sands, backream and circulate from 8080' to 7600. At top of check trip interval R.I.H. to 8955.0 ft No problems. Ream last 180' to bottom, staging Facility Date/Time 24 Aug 99 25 Aug 99 PBS Pad 14:30 14:30-06:00 06:00-06:00 06:00-06:00 06:00-09:00 09:00 09:00-10:00 10:00 10:00-19:00 19:00 19:00-21:00 21:00 21:00-00:30 00:30 00:30-04:30 04:30 04:30-06:00 06:00-18:30 06:00-09:00 09:00 Progress Report Well S-24A Rig Nabors 9ES Page 15 Date 08 September 99 Duration Activity 15-1/2 hr On bottom Drilled to 9665.0 ft No losses. ECD steady. BHA dropping @ 1.2 degree/100'. Vary parameters in attempt to nose up BHA. Now 24 hr 24 hr BHA run no. 9 (cont...) Drilled to 9665.0 ft (cont...) No losses. ECD steady. BHA dropping @ 1.2 degree/100'. Vary parameters in attempt to nose up BHA. Now 3 hr 1 hr 9 hr 2 hr 3-1/2 hr 4 hr 1-1/2 hr 12-1/2 hr 3 hr Drilled to 9795.0 ft Began precautionary measures Drill ahead 9.7/8" hole. Sliding difficult- attempting to maintain angle. Circulated at 9795.0 ft Obtained bottoms up (100% annulus volume) Last stand rotated down- circulate to get sweep to surface with pipe rotation prior to conducting 50 ft slide. Drilled to 10180.0 fl Reached planned end of run - Section / well T.D. Drill ahead 9.7/8" hole. No losses, no drag- ECD steady. BHA dropping 1.2 deg/100 in Rotary. Good correlation with offsets for Sag River pick- observed negative drilling break. Circulated at 10180.0 ft Obtained required geologic samples Sweep hole clean- Siltstone observed in bottoms up. Pulled out of hole to 10180.0 ft At top of check trip interval Flowcheck. POOH. Kingak pulling 20-30 klbs over, Mileuvich "tugging". Work thru tight spot 9,000-8850 ft. Other formations in good shape. Pull back to 5,410 ft. R.I.H. to 10180.0 ft On bottom RIH taking Rotating Torque/weight every 10 stands. Wash/ream down last three stands gradually staging up pumps. Observe resistance @ 9700-9800' & 9,360 ft.. Work/wipe thru same. Circulated at 10180.0 ft No fill on bottom. Circulate and condition mud with 120 RPM/545 GPM. BHA run no. 9 (cont...) Circulated at 10180.0 ft Hole displaced with Water based mud - 50.00 % displaced Some fragmented splinters on bottoms up. Constant background- 2" wide on one shaker. Improved. Displace well bore with 300 bbl clean casing pill @ target properties and 10.7 ppg mudweight. Facility Date/Time PBS Pad 09:00-14:00 14:00 Duration 5 hr 14:00-15:00 1 hr 15:00 15:00-17:00 2 hr 17:00 17:00-18:30 1-1/2 hr 18:30 18:30-20:30 2 hr 18:30-20:30 2 hr 20:30 20:30-06:00 9-1/2 hr 20:30-23:00 2-1/2 hr 23:00 23:00-04:30 5-1/2 hr 26 Aug 99 04:30 I r · Progress Report 04:30-06:00 1-1/2 hr Well S-24A Page 16 Rig Nabors 9ES Date 08 September 99 06:00-15:30 9-1/2 hr 06:00-12:30 6-1/2 hr 12:30 12:30-13:00 1/2 hr 13:00 13:00-15:00 2 hr 15:00 15:00-15:30 1/2 hr 15:30 15:30-22:00 6-1/2 hr 15:30-19:00 3-1/2 hr 19:00 Activity Pulled out of hole to 2669.0 ft At 13-3/8in casing shoe POOH. Kingak 20-30 klbs o/pull. Hole in good shape. Serviced Block line Line slipped and cut Pulled out of hole to 1000.0 ft At BHA Pulled BHA B HA Laid out Laid out BHA. Top stabiliser balled in water courses. Bit balled on one water course plugging one jet. Bit in excellent condition. BOP/riser operations - BOP stack Installed Top ram Equipment work completed Pull wear bushing. Change top rams to 7" and test same to 3500 psi. Pull test plug. Run Casing, 7in O.D. Rigged up Casing handling equipment Work completed - Casing handling equipment in position Clear rigfloor. R/U casing handling equipment and Fill up tool. Hold PJSM. Ran Casing to 2669.0 ft (7in OD) At 7in casing shoe Check Floats. Bakerlock shoetrack. Run 7", 26 lb/ft casing to 13.3/8" shoe @ 2669 ft. Circulated at 2669.0 ft Circulate casing contents - 5 BPM/205 psi. Run Casing, 7in O.D. (cont...) Ran Casing to 7684.0 ft (7in OD) Observed 10.00 klb resistance RIH. Up and down drags following consistent trend. At 7,684 ft unable to pull up- overpull= 350 Klbs. In HRZ formation. Circulated at 7684.0 ft Broke circulation Circulate @ 2 BPM/300 psi- OK. Able to breakover pull @ 335-350 KLbs. Decision made to RIH without attempting any further pick up weights. Ran Casing to 10180.0 ft (7in OD) On bottom RIH. Tag bottom circulating last 20 ft. Final slack-offweight @ 155 klbs. 251 joints ofT', 26 lb/ft casing run. Rigged down Casing handling equipment Equipment work completed R/D Franks Fill up tool. Packer element damaged but intact. R/U Dowell cement head. Cement: Casing cement Circulated at 10180.0 ft Obtained clean returns - 120.00 % hole volume Stage up pumps very slowly from 1 BPM to 6.6 BPM over a two hour period. Final circulating pressure @ 6.6 BPM/500 psi. Circulating 130% string contnets, Facility PBS Pad Date/Time 19:00-19:15 19:15 19:15-20:15 20:15 20:15-21:30 21:30 21:30-22:00 22:00 22:00-00:30 22:00-00:30 27 Aug 99 00:30 00:30-06:00 00:30-06:00 06:00 06:00-06:15 06:00-06:15 06:15 06:15-10:00 06:15-10:00 10:00 10:00-12:00 10:00-10:30 10:30 10:30-12:00 12:00 12:00-03:30 12:00-13:00 13:00 13:00-17:00 Progress Report Well S-24A Page 17 Rig Nabors 9ES Date 08 September 99 Duration Activity 1/4 hr 1 hr 1-1/4 hr 1/2 hr 2-1/2 hr 2-1/2 hr 5-1/2 hr 5-1/2 hr 1/4 hr 1/4 hr 3-3/4 hr 3-3/4 hr 2 hr 1/2 hr 1-1/2 hr 15-1/2 hr 1 hr 4 hr Pumped Water based mud spacers - volume 30.000 bbl Required volume of spacer pumped Pump 5 bbl 11.0 ppg spacer. Test lines. Pump remainder of spacer. Mixed and pumped slurry - 250.000 bbl Cement pumped Mix and pump 195 bbls Lead Slurry @ 11.5 ppg ( 393 sx). Drop Bottom PLug. Mix and pump 55 bbls Tail slurry @ 15.8 ppg ( 267 sx). Drop Top Plug. Displaced slurry - 383.000 bbl Plug bumped Displace slurry @ 6.6 BPM/170 psi. Final pressure prior to bump @ 2.7 BPM= 720 psi. Efficiency of pumps @ 97%. Pressure up to 3000 psi. Bleed off. Check floats- OK. CIP @ 2130 hrs.Total volume lost = 10 bbls. Flow check Observed well static Observe well 30 minutes while clearing rigfloor and preparing cellar. BOP/riser operations - BOP stack Rigged up BOP stack Equipment work completed N/D BOP to set emergency slips. Wellhead work Installed Slip & seal assembly Equipment work completed With 220 klbs string tension- set emergency slips. Evacuate 7" landing joint of fluid. Make rough cut. L/D jt. Redress tubing spool. Make final cut. Install Tubing Spool and prepare to test @ report time. Wellhead work (cont...) Tested Tubing head spool Pressure test completed successfully - 4300.000 psi Test Tubing Spool and pack-off to 4300 psi. BOP/riser operations - BOP stack Installed BOP stack Equipment work completed Nipple up B OP. BHA run no. 10 Rigged down Casing handling equipment Equipment work completed Change out Long bails to short bails. Clear rigfloor. Made up BHA no. 10 BHA no. 10 made up MFU Cleanout assembly and stand back in derrick. BOP/riser operations - BOP stack Installed Top ram Equipment work completed Change out top 7" rams back to 3.1/2" x 6" Vadables. Tested BOP stack Facility PBS Pad Date/Time 17:00 17:00-03:30 28 Aug 99 03:30 03:30-06:00 03:30-06:00 06:00-09:30 06:00-07:00 07:00 07:00-07:30 07:30 07:30-09:30 09:30 09:30-10:30 09:30-10:30 10:30 10:30-23:30 10:30-11:30 11:30 11:30-12:30 12:30 12:30-16:00 16:00 16:00-17:00 17:00 17:00-19:00 19:00 19:00-19:30 19:30 19:30-23:30 23:30 23:30-06:00 Progress Report Well S-24A Page 18 Rig Nabors 9ES Date 08 September 99 Duration 10-1/2 hr 2-1/2 hr 2-1/2 hr 3-1/2 hr 1 hr 1/2 hr 2 hr 1 hr 1 hr 13 hr 1 hr 1 hr 3-1/2 hr 1 hr 2 hr 1/2 hr 4 hr 6-1/2 hr Activity Suspended pressure test on Annular preventor, observed leak R/U test string and run test plug. Test BOPE to 250 psi/4000 psi. Unable to obtain satisfactory test on Annular Installed Annular preventor Equipment work completed Change out Annular element. Run Test string and retest element to 250/3500 psi. Test Blinds to 4000 psi. R/D Test string, run wear ring. BHA run no. 10 R.I.H. to 3400.0 ft RIH picking up 100 joints of 3.1/2" drillpipe. BHA run no. 10 (cont...) Singled in drill pipe to 3540.0 ft 100 joints picked up RIH picking up 3.1/2" drillpipe for 6.1/8" hole section. Circulated at 3540.0 ft Broke circulation Circulate string contents. R.I.H. to 9691.0 ft Stopped: To circulate Fluid system Freeze protect well - 100.000 bbl of Fresh water Completed operations Line up on 7" x 13.3/8" annulus. Pump 100 bbls of Fresh water @ 5 BPM/450 psi ( staging up rate). Line up to HB & R. BHA run no. 10 Washed to 10100.0 ft At Top of cement: 10100.0 ft Wash down @ 5 BPM/1700 psi and tag Float Collar 3 ft deep. While washing down HB & R freeze protect outer annulus with 210 bbls diesel @ 3 BPM/1450 psi. Tested Casing - Via annulus and string Pressure test completed successfully - 4000.000 psi Line up and test 7" casing to 4000 psi/30 minutes. ( 4.2 bbls pumped/returned). Drilled cement to 10187.0 ft Stopped: To circulate Drill hard cement @ 30-40 fph, 8 Klbs WOB. Circulated at 10187.0 ft Obtained bottoms up (100% annulus volume) Circulated at 10187.0 ft Hole displaced with Water based mud - 100.00 % displaced Displace well to 8.4 ppg Quikdrill mud while reciprocating/rotating pipe. Off bottom tq @ 8,000 ft lbs. Flow check Observed well static Pulled out of hole to 0.0 ft At Surface: 0.0 ft BHA run no. 11 Facility PBS Pad Date/Time 23:30-01:30 29 Aug 99 01:30 01:30-05:00 05:00 05:00-06:00 06:00 Duration 06:00-06:30 06:00-06:30 06:30 06:30-07:30 06:30-07:00 07:00 07:00-07:30 07:30 2 hr 07:30-06:00 07:30-16:00 16:00 3-1/2 hr 1 hr 1/2 hr 1/2 hr 1 hr 1/2 hr 1/2 hr 16:00-17:00 17:00 17:00-03:00 30 Aug 99 03:00 22-1/2 hr 8-1/2 hr 1 hr Progress Report Well S-24A Page Rig Nabors 9ES Date lOhr Activity 03:00-04:00 04:00 04:00-04:30 04:30 1 hr 1/2 hr 04:30-06:00 06:00-09:30 06:00-08:00 08:00 08:00-09:30 09:30 1-1/2 hr 3-1/2 hr 2 hr 1-1/2 hr 19 08 September 99 11:00-15:30 15:30 15:30-06:00 09:30-11:00 11:00 09:30-06:00 4-1/2 hr 14-1/2 hr 1-1/2 hr 20-1/2 hr BHA run no. 11 (cont...) Drilled to 10207.0 ft Stopped: To perform FIT Perform integrity test Circulated at 10207.0 ft Obtained bottoms up (100% annulus volume) Performed formation integrity test Obtained required level of integrity - 9.8 ppg EMW Perform FIT. Surface pressure @ 650 psi. EMW @ 9.8 ppg over 8.4 ppg mudweight. BHA run no. 11 Drilled to 10341.0 ft Stopped: To correlate depth Slide drill ahead 6.1/8" hole building angle. Stop to evaulate options given latest tops. Circulated at 10341.0 ft Obtained required geologic samples Stop and circulate well while evulating options given latest formation tops. Drilled to 10525.0 ft Reached planned end of run - Directional objective met Slide drill 6.1/8" hole building and turning. No Drag, no losses. Circulated at 10525.0 ft Obtained bottoms up (100% annulus volume) Pulled out of hole to 10180.0 ft At 7in casing shoe Flowcheck. POOH to 7" casing shoe. Pump dry job. Pulled out of hole to 6000.0 ft BHA run no. 11 (cont...) Pulled out of hole to 1000.0 ft At BHA Pulled BHA BHA Laid out L/D BHA. Bit graded 4/5/I. Outer cutters broken or chipped. BHA run no. 12 Made up BHA no. 12 BHA no. 12 made up Orientate and test tools, 250 GPM/980 psi. R.I.H. to 10525.0 ft On bottom Drilled to 11031.0 ft Drilled from 11,031' to 11,067'. Attempted to slide from 11,061' to 11,067', unable to slide. Decide to short trip. Made up BHA no. 11 BHA no. 11 made up Make up Kickoff assembly w/2 degree BH. Surface test- OK. R.I.H. to 10154.0 ft Stopped: To service drilling equipment Serviced Block line Line slipped Facility Date/Time 31 Aug 99 01 Sep 99 02 Sep 99 03 Sep 99 Progress Report PBS Pad Well S-24A Rig Nabors 9ES Page 20 Date 08 September 99 15:30-06:00 Duration 14-1/2 hr Activity Drilled to 11031.0 ft Directionally drill 6.1/8" hole. Slide first 70 ft. Good sliding characteristics. 3% lubricants. No drag, no losses. 06:00-06:00 06:00-08:00 24 hr 2 hr ECD's tracking 9.6 ppg ( calculated 9.4 ppg). Higher ECD' s because of long 7". BHA run no. 12 (cont...) Drilled to 11067.0 ft (cont...) Directionally drill 6.1/8" hole. Slide first 70 ft. Good sliding characteristics. 3% lubricants. No drag, no losses. 08:00 08:00-09:00 09:00 09:00-09:30 09:30 09:30-10:30 10:30 10:30-11:30 11:30 11:30-12:00 12:00 12:00-06:00 06:00-06:00 06:00-06:00 06:00-06:00 06:00-21:30 21:30 21:30-23:30 23:30 23:30-00:00 00:00 00:00-00:30 1 hr 1/2 hr 1 hr 1 hr 1/2 hr 18hr 24 hr 24 hr 24 hr 15-1/2 hr 2 hr 1/2 hr 1/2 hr ECD's tracking 9.6 ppg ( calculated 9.4 ppg). Higher ECD's because of long 7". - Stopped: To circulate Circulate bottoms up prior to short trip. Circulated at 11067.0 £t Circulate bottoms up. Obtained bottoms up (100% annulus volume) Pulled out of hole to 10180.0 ft At top of check trip interval Serviced Block line PJSM. Cut and slip drilling line. Line slipped and cut Serviced Top drive Equipment work completed R.I.H. to 11067.0 ft RIH. On bottom Drilled to 11630.0 ft Drilled and slide from 11,067' to 11,630'. AST= 5 hrs ART= 6 hrs Adding lubricant as required for sliding. Starting angle build to 94.5 deg. BHA run no. 12 (cont...) Drilled to 12307.0 ft Drill f/11,630' - 12,307', sliding as required for angle and direction. Some difficulty sliding with PDC, pumping lubricant and glass beads to assist. Need to slide left to stay in polygon. BHA run no. 12 (cont...) Drilled to 12700.0 ft Drill ahead. Attempted to slide. Slide was unsuccessful. Decided to rotary drill. TD hole section. Reached planned end of run - Section / well T.D. Drilled to 12,700'. Saw decrease in ROP. Circulated at 12700.0 ft Circulate sweep for short trip. Obtained clean returns - 200.00 % hole volume Pulled out of hole to 12700.0 ft Short trip to 7" casing shoe At 7in casing shoe Serviced Top drive Facility Date/Time 04 Sep 99 Progress Report PBS Pad Well S-24A Page 21 Rig Nabors 9ES Date 08 September 99 00:30 00:30-03:00 03:00 03:00-06:00 03:00-06:00 06:00-13:00 06:00-06:30 06:30 06:30-11:30 11:30 11:30-13:00 13:00 13:00-01:30 13:00-13:30 13:30 13:30-14:00 14:00 14:00-17:00 17:00 17:00-21:00 21:00 21:00-21:30 21:30 21:30-22:00 22:00 22:00-00:00 00:00 00:00-01:30 01:30 01:30-04:00 01:30-02:30 Duration 2-1/2 hr 3 hr 3 hr 7 hr 1/2 hr 5 hr 1-1/2 hr 12-1/2 hr 1/2 hr 1/2 hr 3 hr 4 hr 1/2 hr 1/2 hr 2 hr 1-1/2 hr 2-1/2 hr 1 hr Activity Equipment work completed R.I.H. to 12700.0 ft RIH to 12,700'. Hole in good shape. No fill. On bottom Circulated at 12700.0 ft Circulate hole clean while reciprocating pipe. Spot liner running pill. Circulated at 12700.0 ft Circulate hole clean. Pump high viscosity sweep. Spot liner pill. Check for flow - ok. BHA run no. 12 (cont...) Circulated at 12700.0 ft (cont...) Circulate hole clean. Pump high viscosity sweep. Spot liner pill. Check for flow - ok. Hi-Vis mud spotted downhole Pulled out of hole to 217.0 ft POOH. Check for flow at 7" shoe - ok. Pump pill. Drop 2 3/8" rabbit. Finish pulling out of hole. At BHA Pulled BHA LD BHA. Clear floor of tools. BHA Laid out Stood back DP. L/D directional tools. Run Liner, 4-1/2in O.D. Rigged up Tubing handling equipment RU to run liner. Equipment work completed Held safety meeting Completed operations Ran Liner to 2597.0 ft (4-1/2in OD) Ran 4 1/2" liner. Stopped: To change handling equipment Ran Liner in stands to 10180.0 ft RIH with liner, filling DP every 10 stands to 7" shoe. Stopped: To circulate Rigged up Cement head MU cement head. Set on pipe skate. Equipment work completed Circulated at 10180.0 ft Broke circulation Ran Liner in stands to 12687.0 ft Finish running liner. Tag bottom at 12,700'. On bottom Circulated at 12700.0 ft Held PJSM. Batch mix cement. Obtained clean returns - 150.00 % hole volume Cement: Liner cement Mixed and pumped slurry - 77.000 bbl Pump 5 bbl spacer. Tested lines to 4500 psi. Pump 35 spacer. Pumped 77 bbl G cmt at 15.8 ppg. Washed lines. Displaced cmt w/45 bbl perf pill & 83.5 bbl mud. Bumped plug at calc'd strokes. CIP 0230 hrs, 9/4/99. Facility Date/Time Progress Report PBS Pad Well S-24A Page 22 Rig Nabors 9ES Date 08 September 99 02:30 02:30-03:00 03:00 03:00-04:00 04:00 04:00-06:00 04:00-05:30 05:30 05:30-06:00 05:30-06:00 06:00-08:30 06:00-08:30 08:30 08:30-15:30 08:30-10:00 10:00 10:00-10:30 10:30 10:30-12:00 12:00 12:00-15:30 15:30 15:30-17:30 15:30-17:30 17:30 17:30-18:30 17:30-18:30 18:30 18:30-06:00 18:30-19:30 19:30 19:30-03:00 Duration 1/2 hr 1 hr 2 hr 1-1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 2-1/2 hr 7 hr 1-1/2 hr 1/2 hr 1-1/2 hr 3-1/2 hr 2 hr 2 hr 1 hr 1 hr 11-1/2 hr 1 hr 7-1/2 hr Activity Cement pumped Functioned Liner hanger Pressure to 3500 psi. Set liner hanger. Bleed pressure to 1000 psi. Rotate and unsting from hanger. Circ while setting down 30K to set packer. PU and circ. Equipment work completed Circulated at 10003.0 ft Circ 20 bbl excess cement at 10 bpm. Reciprocate pipe. Obtained clean returns - 150.00 % hole volume Fluid system Fill pits with Seawater Clean pits and seawater tanks. Completed operations Circulated at 10000.0 ft Displace well to clean seawater. Circulated at 10000.0 ft Displace well bore to clean seawater. Fluid system (cont...) Circulated at 10000.0 ft (cont...) Displace well bore to clean seawater. Hole displaced with Seawater - 150.00 % displaced Run Liner, 4-1/2in O.D. Racked back Drillpipe POH to 6,200'. Stopped · To change handling equipment Rigged down Cement head Make service breaks and L/D cement head Equipment work completed Serviced Block line Line slipped and cut Laid down 3919.9 ft of Drillpipe Hold PJSM. Check Crown-O-Matic. POH and L/D 3-1/2" DP and liner hanger tools. Completed operations Test well control equipment Tested BOP stack Pull wear ring and test BOP. Test Hydrill to 250/3500 psi. Tested pipe rams, blind rams, choke and kill line valves to 250/4000 psi. Tested accumulator, OK. (Choke and floor safety valves tested on TOH). Witness waived by AOGCC Larry Wade. Pressure test completed successfully - 4000.000 psi Perform integrity test Tested Casing Closed blind rams and tested casing to 4000 psi, 30 min test. Installed wear ring. Pressure test completed successfully - 4000.000 psi Electric wireline work Rigged up Logging/braided cable equipment R/U Schlumberger. Equipment work completed Conducted electric cable operations 1')111 ...I [-~r)rlTM T ~: ..... _C_~ rI~t'-'~T ~- 1/~ t~f"tO' '~.T~- (:lL J_~l UL 1%111 WI ~..-1~ 1. l_~U[il~lll[ tlJ7/ IIUllI IUD IUjUUJ · Progress Report Facility PBS Pad Well S-24A Page 23 Rig Nabors 9ES Date 08 September 99 Date/Time 05 Sep 99 03:00 03:00-06:00 03:00-06:00 06:00-13:30 06:00-07:30 07:30 07:30-13:30 13:30 13:30-06:00 13:30-22:00 22:00 22:00-23:00 23:00 23:00-00:00 06 Sep 99 00:00 00:00-00:30 00:30 00:30-01:15 01:15 01:15-03:30 03:30 03:30-06:00 03:30-06:00 06:00-15:00 Duration 3 hr 3 hr 7-1/2 hr 1-1/2 hr 6 hr 16-1/2 hr 8-1/2 hr 1 hr 1 hr 1/2 hr 3/4 hr 2-1/4 hr 2-1/2 hr 2-1/2 hr 9 hr Activity showing significant cement bonding, continue to log Completed run with GR from 10003.0 ft to 0.0 ft Conducted electric cable operations Eline run # 2. M/U USIT tool for CBL. Saw fair to poor cmt with 20 % bonding. POH and L/D USIT tool. Conducted electric cable operations P/U and RIH w/USIT tool for CBL. RIH to TOL and logging up. Log showing approx 20% cement bond, low strength cement. POH at report time. Electric wireline work (cont...) Conducted electric cable operations (cont...) P/U and RIH w/USIT tool for CBL. RIH to TOL and logging up. Log showing approx 20% cement bond, low strength cement. POH at report time. Completed logging run with Cement bond log from 10000.0 ft to 710 Conducted electric cable operations Eline run #3. M/U CBT tool and RIH to 10,260'. Tool showing good to fair cmt btwn 4-1/2" liner and OH, and in liner lap. Some formation signals showing up at 7" shoe. Press pass in 7" same result as USIT. Bleed off press, POH & RD. Completed logging run with Cement bond log from 10260.0 ft to 935 2-7/8in. Perforation assembly workstring run Ran Tubing to 2720.0 ft (2-7/8in OD) RU to run perf guns. PJSM. P/U perf guns, 77 jnts 2-7/8" fox tubing. RIH. Stopped: To change handling equipment Ran Drillpipe in stands to 12598.0 ft P/U Halliburton pkr and perforating equipment, 4 stnds 3 1/2" DP, and 102 stnds 4" DP. RIH and tag landing collar. On bottom Set packer at 9910.0 ft with 0.0 psi PJSM. RU lines to circ and eco-meter to detect shots. PT lines to 3,000 psi. Set packer. Packer set at 9910.0 ft Perforated Perforated from 12,377' to 12,597' at 4 SPF. Closed annular preventer. Press up annulus to 2600 psi. Bleedback to 200 psi. Wait for time delay guns to fire. Obtain bubbles in bubble bucket indicating gunsfired. Pull up on DP to open bypass port. Guns fired from 12377.0 ft to 12597.0 ft Circulated at 9900.0 ft Reverse circ 2 btms up. Minimal losses. String displaced with Seawater - 200.00 % displaced Circulated at 9943.0 ft Circ through ports below pkr at 5 bpm. Obtained clean returns - 150.00 % hole volume Laid down 3410.0 ft of 4in OD drill pipe POH laying down DP. Laid down 3410.0 ft of 4in OD drill pipe Finish L/D drill pipe to HOWCO equipment. 2-7/8in. Perforation assembly workstring run (cont...) ).0 ft 3.0 ft Facility Date/Time PBS Pad 06:00-11:00 11:00 11:00-1 t:30 11:30 11:30-13:30 13:30 13:30-15:00 15:00 15:00-05:30 15:00-15:30 Duration 5 hr 1/2 hr 2 hr 1-1/2 hr 14-1/2 hr 1/2 hr 15:30 15:30-16:00 16:00 16:00-21:30 1/2 hr 5-1/2hr 21:30 21:30-22:30 1 hr 1/2 hr 22:30 22:30-23:00 23:00 23:00-02:00 07 Sep 99 02:00 02:00-02:30 3 hr Progress Report 02:30 02:30-03:00 Well S-24A Page Rig Nabors 9ES Date 03:00 03:00-04:00 04:00 04:00-05:00 05:00 05:00-05:30 05:30 05:30-06:00 05:30-06:00 06:00 06:00-08:00 1/2 hr 1/2 hr 1 hr 1 hr 1/2 hr 1/2 hr 1/2 hr 2 hr 24 08 September 99 Activity Laid down 9909.0 ft of 4in OD drill pipe (cont...) Finish L/D drill pipe to HOWCO equipment. Stopped: To change handling equipment Retrieved Retrievable packer L/D Halliburton tools. Completed operations Laid down 2412.0 ft of Tubing L/D 77 jts 2-7/8"Fox tubing. 77 joints laid out Retrieved Gun assembly L/D perf guns. All shots fired OK. At Surface: 0.0 ft Run Single completion, 4-1/2in O.D. Rigged up Completion string handling equipment Equipment work completed Held safety meeting Held PJSM. Completed operations Ran Tubing to 10007.0 ft (4-1/2in OD) Ran 239 its 4.5", 12.6#, L-80 tubing + jewlery. At Top of liner: 10003.0 ft Tagged up inside liner @ 10,010. Space out tubulars Spaced out and landed tubing on hanger. Completed operations Installed Tubing hanger RILDS. Equipment work completed Reverse circulated at 10007.0 ft R/U and reverse circulate 160 bbls inhibited seawater + 80 bbls diesel. String displaced with Inhibited brine - 100.00 % displaced Monitor wellbore pressures Switch valves and allow diesel to U-tube. Observed well static Set packer at 9951.0 ft with 4000.0 psi Dropped ball. Pressure tubing to 4000 psi to set packer. Packer set at 9951.0 ft Tested Tubing Pressure test tubing to 4000 psi for 30 min, OK. Pressure test completed successfully - 4000.000 psi Tested Permanent packer - Via annulus and string Perform 30 rain annular test to 4000 psi, OK. Test witnesses by L. Gramaldi AOGCC. Pressure test completed successfully - 4000.000 psi Laid down 24.0 ft of Drillpipe L/D landing jr. R/D hoses. Completed operations Wellhead work Installed Hanger plug Installed TWC. Eqpt. work completed, running tool retrieved Nipple down BOP stack Facility Date/Time Progress Report PBS Pad Well S-24A Page 25 Rig Nabors 9ES Date 08 September 99 06:00-08:00 08:00 08:00-06:00 08:00-10:30 10:30 10:30-11:00 11:00 11:00-11:30 11:30 Duration 2 hr 22 hr 2~ 1/2 hr 1/2 hr 1/2 hr Activity Removed BOP stack Equipment work completed Wellhead work Installed Xmas tree NFU adapter and tree. Tested tree and adapter to 5000 psi, ok. Equipment work completed Removed Hanger plug Pulled TWC. Equipment work completed Installed Hanger plug Installed BPV and secured well. Eqpt. work completed, running tool retrieved Rig released for move to W-26A at 1130 hrs 9/7/99. 10/6/99 GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATEN: Sherrie NO. 12838 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Prudhoe Bay (Cased Hole) Well Job # Log Description Date Blueline Sepia CD S-24A ~ d.~.~,..~,~ MEM JEWELRY & STATIC LOG 990924 I i S-24A 99374 USlT 990904 I Color S-24A 99373 CBL (PDC) 990904 1 ] 1 B-02A ~ ~'"5 ~ ~ 99323 RST 990804 I I 1 K-04A 99371 CBL/SCMT 990924 I Color PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: RECEIVED t' ~,,~"i' '13 1999 Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 iTeTcN :eill ,..~~?~~errie ~ ........ ANADRI LL SCHLUMBERGER Survey report Client ................... : BP Exploration (Alaska) Inc. Field .................... : Prudhoe Bay Well ..................... : S-24Ai API number ............... : 50-029-22044-01 Engineer ................. : N.Rose Rig: ..................... : Nabors 9ES ~tate: ................... : Alaska Survey calculation methods Method for positions ..... : Minimum curvature Method for DLS ........... : Mason & Taylor Depth reference Permanent datum .......... : Mean Sea Level Depth reference .......... : Drill Floor GL above permanent ....... : 35.43 ft KB above permanent ....... : 63.77 ft DF above permanent ....... : 63.77 ft Vertical section origin Latitude (+N/S-) ......... : Departure (+E/W-) ........ : 0.00 ft 0.00 ft Platform reference point-- atitude (+N/S-) ......... : -999.25 ft Departure (+E/W-) ........ : -999,25 ft Azimuth from rotary table to target: 307.40 degrees 2-Sep-1999 23:37:55 Page 1 of 15 Spud date ................ : 13-AUG-99 Last survey date ......... : 02-Sep-99 Total accepted surveys...: 418 MD of first survey ....... : 0.00 ft MD of last survey ........ : 12699.00 ft Geomagnetic data~ Magnetic model ........... : BGGM version 1999 Magnetic date ............ : Il-Aug-1999 Magnetic field strength..: 1146.73 HCNT Magnetic dec (+E/W-) ..... : 27.20 degrees Magnetic dip ............. : 80.70 degrees MWD survey Reference Criteria Reference G .............. : 1002.68 mGal Reference H .............. : 1146.70 HCNT Reference Dip ............ : 80.70 degrees Tolerance of G ........... : (+/-) 2.50 mGal Tolerance of H ........... : (+/-) 6.00 HCNT Tolerance of Dip ......... : (+/-) 0.45 degrees Corrections Magnetic dec (+E/W-) ..... : 27.19 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-) .... : 27.19 degrees (Total az corr = magnetic dec - grid conv) Sag applied (Y/N) ........ : No degree: 0.00 [(c) 1999 Anadrill IDEAL ID6 0C 04] -- -- ORIGINAL ANADRILL SCHLUMBERGER Survey Report Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 1 0,00 0.00 0,00 2 5,88 0.42 116.35 3 14.38 0,42 110,28 4 23.78 0.30 94.68 5 33.38 0.17 74.68 2-Sep-1999 23:37:55 6 44,58 0,15 30,16 7 55.98 0,17 342,01 8 67,33 0.18 328.07 9 78.73 0,15 326,52 10 90.13 0,12 335,52 Page 11 101,53 0,10 347,61 12 112.93 0.08 348,69 13 124.43 0,08 324,81 14 135,88 0,07 288,77 15 147,38 0.08 259.82 TVD Vertical Displ Displ Total At depth section +N/S- +E/W- displ Azim (ft) (ft) (ft) (ft) (ft) (deg) 16 158.78 0.10 236.88 17 170.18 0,13 219.89 18 181,58 0,15 209,80 19 192,78 0.17 206,95 20 204,08 0,18 204.10 21 215,33 0,20 194,91 22 226,63 0,22 183,42 23 237,93 0,23 175.17 24 249,23 0,25 166.64 25 260,53 0,27 155,87 0,00 0.00 0,00 0,00 0,00 0,00 5,88 5.88 -0,02 -0.01 0,02 0.02 8,50 14,38 -0.08 -0.03 0.08 0,08 9.40 23.78 -0,14 -0.05 0,13 0,14 9.60 33.38 -0.16 -0.05 0.17 0.18 26 271.83 0.27 144,10 27 283,03 0,28 130,55 28 294.33 0,28 117,01 29 305,53 0,28 104,30 30 316,83 0.27 89,78 11,20 11,40 11,35 11,40 11.40 11,40 11.40 11,50 11.45 11..50 11.40 11.40 11,40 11,20 11,30 0,00 116,35 114,10 109.86 105.10 44,58 -0,17 -0,03 0,20 0,20 98,54 55.98 -0,16 -0,00 0.20 0.20 90,11 67,33 -0,13 0.03 0,18 0.19 80.46 78.73 -0,10 0,06 0,17 0,18 70,55 90.13 -0,07 0,08 0,15 0.17 61.77 0.15 0,14 0,14 0,12 0.11 0,09 0,08 0,06 0,05 0,03 0,18 0,19 0,19 0,19 0.18 0.17 0,14 0,12 0,08 0.05 11,25 11,30 11,30 11,30 11.30 101,53 -0.05 0,10 112,93 -0,04 0,12 124,43 -0,03 0,13 135.88 -0,01 0,14 147,38 0,00 0,14 158.78 0,01 0,14 170.18 0,01 0,12 181,58 0,01 0,10 192,78 0,01 0,07 204,08 -0.00 0.04 11.30 11,20 11,30 11,20 11,30 215.33 -0,01 0.01 0.02 0.02 226,63 -0,03 -0,04 0,01 0.04 237,93 -0,06 -0,08 0,01 0.08 249,23 -0,09 -0,13 0,02 0,13 260.53 -0.14 -0.17 0.04 0.18 271.83 -0.18 -0,22 0.06 0,23 283,03 -0.24 -0.26 0,10 0.28 294,33 -0,29 -0,29 0,15 0.32 305,53 -0,34 -0,31 0,20 0,37 316.83 -0,39 -0,32 0.25 0,40 54,82 49,73 45,21 40,93 37,26 34,25 32,22 31,68 32,92 37.96 75,20 160,45 170,56 170,62 167,90 163,83 158,90 153,33 147,56 141,66 2 of 15 DLS (deg/ 100f) 0,00 7,14 0.52 1.64 1.58 1.09 1,16 0.38 0.27 0.32 0,27 0,18 0,29 0.41 0,34 0,36 0,40 0,28 0,19 0,12 0,32 0,41 0,30 0,36 0,47 0,49 0.59 0,58 0,55 0,62 Srvy tool type TIP GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO Tool qual type .. [ (c)1999 Anadrill IDEAL ID6_0C_04] ANADRILL SCHLUMBERGER Survey Report 2-Sep-1999 23:37:55 Page 3 of 15 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 31 328.03 0.23 76.95 11.20 32 339.28 0.22 68.01 11.25 33 350.58 0.17 59.42 11.30 34 361.88 0.12 49.69 11.30 35 373.18 0.05 27.29 11.30 36 384.48 0.03 290.86 37 395.78 0.12 206.77 38 407.08 0.17 199.57 39 418.33 0.22 191.68 40 429.58 0.23 184.15 TVD Vertical Displ Displ depth section +N/S- +E/W- (ft) (ft) (ft) (ft) 328.03 -0.43 -0.31 0.30 339.28 -0.45 -0.30 0.34 350.58 -0.47 -0.28 0.37 361.88 -0.48 -0.27 0.40 373.18 -0.48 -0.25 0.41 41 440.88 0.23 175.67 42 452.18 0.25 161.59 43 463.48 0.27 145.86 44 474.78 0.25 129.96 45 486.08 0.23 114.24 11.30 384.48 -0.48 -0.25 0.41 11.30 395.78 -0.47 -0.26 0.40 11.30 407.08 -0.48 -0.28 0.39 11.25 418.33 -0.50 -0.32 0.38 11.25 429.58 -0,52 -0.36 0.37 46 497.33 0.20 99.89 47 508.63 0.15 85.09 48 519.88 0.10 66.36 49 531.18 0.07 41.78 50 542.43 0.05 350.03 11.30 11.30 11.30 11.30 11.30 51 553.73 0.05 285.01 52 565.03 0.10 243.59 53 576.33 0.13 223.01 54 587.68 0.15 213.34 55 598.98 0.17 205.50 440.88 452.18 463.48 474.78 486.08 56 610.28 0.17 191.58 57 621.53 0.18 173.02 58 632.83 0.18 154.60 59 644.18 0.17 135.37 60 655.43 0.15 116.19 -0.55 -0.58 -0.63 -0.68 -0.72 -0,41 0.37 -0.46 0.38 -0.50 0.41 -0~.54.',i~ · ~0.44 -0.56 0.48 11.25 497.33 -0.76 -0.58 0.52 11.30 508.63 -0.79 -0.58 0.55 11.25 519.88 -0.81 -0.57 0.58 11.30 531.18 -0.81 -0.56 0.59 11.25 542.43 -0.81 -0.55 0.60 11.30 553.73 -0.80 -0.55 0.59 11.30 565.03 -0.79 -0.55 0.58 11.30 576.33 -0.79 -0.56 0.56 11,35 587.68 -0.79 -0.59 0.54 11.30 598.98 -0.79 -0.61 0.53 11.30 610.28 -0.80 -0.65 0.52 11.25 621.53 -0.82 -0.68 0.51 11.30 632.83 -0.85 -0.71 0.52 11.35 644.18 -0,88 -0.74 0.54 11.25 655.43 -0.91 -0.76 0.57 , Total At DLS Srvy Tool displ Azim (deg/ tool qual (ft) (deg) 100f) type type 0.43 136.19 0.61 GYRO 0.45 131.19 0.32 GYRO 0.47 126.87 0.51 GYRO 0.48 123.63 0.49 GYRO 0.48 121.70 0.67 GYRO 0.48 121.17 0.54 GYRO 0.48 122.66 1.07 GYRO 0.48 126.00 0.47 GYRO 0.50 130.11 0.50 GYRO 0.52 134.21 0,28 GYRO 0.55 137.56 0,30 GYRO 0.60 139.87 0.55 GYRO 0.64 140.93 0.65 GYRO 0.70 140.73 0.66 GYRO 0.74 139.59 0.61 GYRO 0.78 137.95 0.55 GYRO 0.80 136.24 0.59 GYRO 0.81 134.78 0.57 GYRO 0.82 133.65 0.41 GYRO 0.81 132.96 0.49 GYRO 0.80 132.92 0.48 GYRO 0.80 133.75 0.63 GYRO 0.79 135.34 0.45 GYRO 0.80 137.31 0.27 GYRO 0.81 139.43 0,26 GYRO 0.83 141.41 0.36 GYRO 0.85 142.89 0.51 GYRO 0.89 143.70 0.51 GYRO 0.92 143.76 0.52 GYRO 0.95 143.20 0.51 GYRO [(c)1999 Anadrill IDEAL ID6 0C 04] ANADRILL SCHLUMBERGER Survey Report Seq Measured Incl Azimuth # depth angle angle - (ft) (deg) (deg) 61 666.73 0.15 91.98 62 678.03 0.12 62.50 63 689.28 0.08 38.17 64 700.58 0.08 9.56 65 711.78 0.07 333.95 2-Sep-1999 23:37:55 66 722.98 0.07 298.27 67 734.23 0.05 255.33 68 745.48 0.08 222.57 69 756.73 0.10 200.54 70 768.03 0.12 176.75 Course TVD Vertical Displ Displ Total length depth section +N/S- +E/W- displ (ft) (ft) (ft) (ft) (ft) (ft) 11.30 666.73 -0.94 -0.77 0.60 0.97 11.30 678.03 -0.96 -0.76 0.62 0.98 11.25 689.28 -0.96 -0.75 0.64 0.98 11.30 700.58 -0.96 -0.74 0.64 0.98 11.20 711.78 -0.95 -0.72 0.64 0.97 71 779.33 0.13 157.09 72 790.58 0.15 138.58 73 801.83 0.17 120.10 74 813.13 0.18 102.52 75 824.43 0.17 85.26 11.20 722.98 -0.94 -0.71 0.63 0.95 11.25 734.23 -0.93 -0.71 0.62 0.94 11.25 745.48 -0.92 -0.72 0.61 0.94 11.25 756.73 -0.92 -0.73 0.60 0.95 11.30 768.03 -0.93 -0.75 0.60 0.96 779.33 790.58 801.83 813.13 824,43 11.30 11.25 11.25 11.30 11.30 76 835.73 0.15 69.91 11.30 835.73 77 846.98 0.15 55.37 11.25 846.98 78 858.28 0.12 34.21 11.30 858.28 79 869.58 0.10 15.55 11.30 869.58 80 880.88 0.07 2.09 11.30 880.88 81 892.18 0.02 330.32 82 903.38 0.02 266.23 83 914.58 0.05 186.32 84 925.88 0.10 137.70 85 937.08 0.13 126.13 892.18 903.38 914.58 925.88 937.08 11.30 11.20 11.20 11.30 11.20 86 948.28 0.15 116.31 11.20 948.28 87 959.58 0.17 98.94 11.30 959.58 88 970.83 0.18 78.21 11.25 970.83 89 982.13 0.17 59.94 11.30 982.13 90 993.43 0.13 41,64 11.30 993.43 -0.95 -0.98 -1.01 -1.04 -1.07 -1.09 -1.10 -1.11 -1.10 -1.10 -1.09 -1.09 -1.09 -1.10 -1.12 -1.15 -1,18 -1.21 -1.22. -1.23 -0.78 , ,0.80 -0.82 -0.83 -0.83 0.61 0.62 0.64 0.68 0.71 -0.83 -0.81 -0.80 -0.78 -0.76 0.74 0.77 0.79 0.80 0.80 -0.75 -0.75 -0.76 -0.77 -0.78 0.80 0.79 0.79 0.80 0,81 -0.80 -0.81 -0.80 .~0,79 -0.77 0.84 0.87 0.90 0.93 0.96 Page At Azim (deg) __ 142.13 140.79 139.67 138.86 138.40 0.99 1.01 1,04 1.07 1.10 1.11 1.12 1.12 1.11 1.10 1.10 1.09 1.09 1.11 1.13 1.16 1.18 1.21 1.22 1.23 138.43 138.84 139.58 140.57 141.49 142.09 142.22 141.83 140.89 139.60 138.18 136.73 135.39 134.35 133.64 133,34 133.38 133.66 133.90 133.84 133.54 132.87 131.74 130,33 129.00 4 of 15 DLS (deg/ 100f) 0.56 0.66 0.51 0.35 0.42 0.38 0.42 0.41 0.35 0.44 0.39 0.44 0.49 0.48 0.47 0.42 0.34 0.51 0.36 0.32 0.48 0.19 0.45 0.68 0.34 0.28 0.46 0.57 0.50 0.55 Srvy tool type GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO Tool qual type [(c)1999 Anadrill IDEAL ID6_0C_04] ANADRILL SCHLUMBERGER Survey Report Seq # 91 92 93 94 95 Measured Incl Azimuth depth angle angle (ft) (deg) (deg) 1004.63 0.12 23.01 1015.73 0.10 2.32 1026.83 0.08 345.03 1037.98 0.05 341.72 1049.13 0.02 44.27 2-Sep-1999 23:37:55 96 1060.28 0.07 107.26 97 1071.43 0.15 105.68 98 1082.58 0.22 98.64 99 1093.68 0.25 90.86 100 1104.78 0.27 84.15 Course TVD Vertical Displ Displ length depth section +N/S- +E/W- (ft) (ft) (ft) (ft) (ft) 11.20 1004.63 -1.23 -0.75 0.97 11.10 1015.73 -1.22 -0.73 0.97 11.10 1026.83 -1.21 -0.72 0.97 11.15 1037.98 -1.20 -0.70 0.97 11.15 1049.13 -1.19 -0.70 0.97 101 1115.88 0.28 75.15 102 1126.93 0.32 64.96 103 1138.03 0.32 58.19 104 1149.08 0.32 52.12 105 1160.23 0.30 48.97 11.15 11.15 11.15 11.10 11.10 106 1171.38 0.28 49.23 107 1182.53 0.27 51.36 108 1193.73 0.27 56.40 109 1204.88 0.27 64.14 110 1216.03 0.27 78.19 11.10 11.05 11.10 11.05 11.15 111 1227.18 0.32 92.31 112 1238.33 0.40 96.44 113 1249.48 0.47 94,76 114 1260.63 0.52 94.10 115 1271.78 0.55 93.08 11.15 11.15 11.20 11.15 11.15 116 1282.93 0.55 89.09 117 1294.08 0.55 85.33 118 1305.13 0.53 81.42 119 1316.23 0.53 77.11 120 1327.28 0.52 74.53 11.15 11.15 11.15 11.15 11.15 1060.28 -1.20 -0.70 0.98 1071.43 -1.22 -0.71 1.00 1082.58 -1.25 -0.71 1.03 1093.68 -1.29 -0.72 1.08 1104.78 -1.33 -0.71 1.13 1115.88 -1.37 -0.70 1.18 1126.93 -1.40 -0.68 1.23 1138.02 -1.42 -0.65 1.29 1149.07 -1.44 -0.62 1.34 1160.22 -1.45 -0.58 1.39 1171.37 -1.47 -0.54 1.43 1182.52 -1.48 -0.51 1.47 1193.72 -1.49 -0.48 1.51 1204.87 -1.51 -0.45 1.56 1216.02 -1.54 -0.44 1.61 1227.17 -1.58 -0.43 1.66 1238.32 -1.64 -0.44 1.73 1249.47 -1.72 -0.45 1.82 1260.62 -1.80 -0.45 1.91 1271,77 -1.88 -0.46 2.02 1282.92 -1.97 -0.46 2.13 1294.07 -2.05 -0.46 2.23 1305.12 -2.13 -0.44 2.34 1316.22 -2.19 -0.43 2.44 1327.27 -2.26 -0.40 2.53 11.15 11.15 11.05 11.10 11.05 Page 5 of 15 Total At DLS Srvy displ Azim (deg/ tool (ft) (deg) 100f) type 1.23 127,88 0.37 GYRO 1.22 126.98 0.40 GYRO 1.21 126.38 0.30 GYRO 1.20 126.01 0.27 GYRO 1.19 125.78 0.40 GYRO 1.20 125.59 0.57 GYRO 1.22 125.26 0.72 GYRO 1.25 124.59 0.66 GYRO 1.29 123.59 0.39 GYRO 1.34 122.31 0.33 GYRO 1.37 120.81 0.40 GYRO 1.41 118.99 0.60 GYRO 1.45 116.92 0.34 GYRO 1.48 114.81 0.31 GYRO 1.50 112.74 0.24 GYRO 1.53 110.85 0.18 GYRO 1.56 109.13 0.13 GYRO 1.59 107.57 0.21 GYRO 1.62 106.21 0.33 GYRO 1,67 105.18 0.59 GYRO 1.72 104.55 0.79 GYRO 1.79 104.16 0.75 GYRO 1.87 103.77 0.64 GYRO 1.97 103.32 0.45 GYRO 2.07 102.83 0.28 GYRO 2.18 102.26 0.34 GYRO 2.28 101.56 0.32 GYRO 2.38 100.78 0.38 GYRO 2.47 99.91 0.36 GYRO 2.57 98.98 0.23 GYRO Tool qual type [(c)1999 Anadrill IDEAL ID6 0C 04] ANADRILL SCHLUMBERGER Survey Report 2-Sep-1999 23:37:55 Page 6 of 15 Seq Measured Incl Azimuth # depth angle angle - (ft) (deg) (deg) 121 1338.38 0.50 72.59 122 1349.48 0.50 70.52 123 1360.58 0.53 69.24 124 1371.78 0.58 68.70 125 1382.88 0.58 68.81 Course TVD Vertical Displ Displ length depth section +N/S- +E/W- (ft) (ft) (ft) (ft) (ft) 11.10 1338.37 -2.32 -0.37 2.63 11.10 1349.47 -2.37 -0.34 2.72 11.10 1360.57 -2.42 -0.31 2,81 11.20 1371.77 -2.48 -0.27 2.92 11.10 1382.87 -2.54 -0.23 3.02 126 1394.08 0.58 69.71 127 1405.18 0.58 71.53 128 1416.38 0.60 72.49 129 1427.53 0.62 71.80 130 1438.68 0.65 72.33 11.20 11.10 11.20 11.15 11.15 131 1449.88 0.70 74.59 132 1461.03 0.78 74.40 133 1472.18 0.82 72.64 134 1483.33 0.83 72.32 135 1494.53 0.82 71.74 11.20 11.15 11.15 11.15 11.20 136 1505.58 0.83 70.19 137 1516.63 0.83 66.24 138 1527.78 0.82 61.61 139 1538.88 0.77 57.74 140 1549.98 0.72 55.54 11.05 11.05 11.15 11.10 11.10 141 1561.13 0.68 142 1572.28 0.67 143 1583.48 0.65 144 1594.68 0.62 145 1605.78 0.62 1394.07 -2.60 -0.19 3.13 1405.17 -2.66 -0.15 3.23 1416.37 -2.73 -0,12 3.34 1427.52 -2.79 -0.08 3.46 1438.66 -2.86 -0.04 3.57 146 1616.98 0.62 147 1628.18 0.62 148 1639.33 0.63 149 1650.48 0.72 150 1661.68 0.80 1449.86 -2.94 -0.00 3.70 1461.01 -3.03 0.04 3.84 1472.16 -3.12 0.08 3.99 1483.31 -3.21 0.13 4.14 1494.51 -3.30 0.18 4.29 1505.56 -3.39 0.23 4.44 1516.61 -3.47 0.29 4.59 1527.76 -3.55 0,36 4.74 1538.85 -3.60 0.44 4.87 1549.95 -3.65 0.52 4.99 56.03 11.15 1561.10 58.33 11.15 1572.25 62.59 11.20 1583.45 66.70 11.20 1594.65 70.25 11.10 1605.75 73.93 11.20 1616.95 77.03 11.20 1628.15 80.61 11.15 1639.30 84.73 11.15 1650.45 85.57 11.20 1661.65 -3.69 0.59 5.10 -3.74 0.66 5.21 -3.79 0.73 5.33 -3.85 0.78 5.44 -3.91 0.82 5.55 -3.98 0.86 5.66 -4.05 0.89 5.78 -4.13 0.92 5.90 -4.23 0.93 6.03 -4.34 0.95 6.18 Total At DLS Srvy Tool displ Azim (deg/ tool qual (ft) (deg) 100f) type type 2.66 98.07 0.24 2.74 97.17 0.16 2.83 96.24 0.29 2.93 95.27 0.45 3.03 94.32 0.01 3.13 93.44 0.08 3.24 92.67 0.17 3.34 91.97 0.20 3.46 91.30 0.19 3.57 90.65 0.27 3.70 90.05 0.51 3.84 89.47 0.72 3.99 88.86 0.42 4.14 88.23 0.10 4.30 87.63 0.12 4.45 87.04 0.22 4.60 86.40 0.52 4.75 85.66 0.60 4.89 84.87 0.66 5.02 84.09 0.52 5.14 83.37 0.36 5.26 82.74 0.26 5.38 82.22 0.47 5.49 81.83 0.49 5.61 81.55 0.35 5.73 81.35 0.36 5.85 81.22 0.30 5.97 81.18 0.36 6.10 81.21 0.92 6.25 81.31 0.72 GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO [(c)1999 Anadrill IDEAL ID6 0C 04] -- -- ANADRILL SCHLUMBERGER Survey Report 2-Sep-1999 23: 37: 55 Page 7 of 15 Seq Measured Incl Azimuth # depth angle angle - (ft) (deg) (deg) 151 1672.88 0,83 85,13 152 1684,03 0,85 86.11 153 1695.18 0.87 86,20 154 1706.28 0.90 85.27 155 1717,38 0,92 84,18 Course TVD Vertical Displ Displ Total At DLS length depth section +N/S- +E/W- displ Azim (deg/ (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) 11.20 1672,85 -4.45 0,96 6,34 6,41 81,41 0,27 11,15 1683.99 -4,58 0.97 6.50 6,57 81.51 0.22 11,15 1695.14 -4.70 0.98 6.67 6.74 81.63 0,18 11.10 1706,24 -4.83 0,99 6.84 6,91 81,73 0.30 11,10 1717,34 -4,96 1,01 7,01 7,09 81,80 0,24 156 1728.53 0,92 83,61 157 1739,63 0.88 84,69 158 1750,73 0.85 86.73 159 1761.93 0.85 89.09 160 1773,13 0,85 91,09 11,15 11.10 11.10 11,20 11.20 161 1784,33 0,83 92,59 162 1795,53 0.80 95.84 163 1806,53 0.80 98.54 164 1817.58 0,83 99,49 165 1828.63 0.82 102.37 11,20 11,20 11,00 11,05 11.05 166 1839,63 0,80 106.54 167 1850,68 0,82 108,94 168 1861.68 0,82 109.55 169 1872,73 0,80 111,14 170 1883,78 0,85 113,66 11.00 11,05 11,00 11,05 11,05 171 1894,78 0,93 114,68 172 1905.73 0,92 114,96 173 1916,68 0,88 115,54 174 1927,68 0.83 116,50 175 1938,63 0,83 116,08 11,00 10,95 10,95 11,00 10,95 176 1949.58 0.82 115.52 177 1960,58 0,75 115,89 178 1971,63 0,70 114.72 179 1982,68 0,68 113,23 180 1993,68 0.65 111,02 10,95 11,00 11.05 11,05 11,00 1728,49 -5,09 1,03 7,19 7,27 1739,59 -5.22 1.05 7.37 7.44 1750,69 -5,34 1.06 7,53 7,61 1761.89 -5,47 1.07 7.70 7,77 1773,08 -5,60 1,07 7,87 7,94 1784,28 -5,73 1,06 8.03 8.10 1795,48 -5,87 1.05 8,19 8,26 1806,48 -6.00 1.03 8.34 8,40 1817,53 -6,14 1.01 8,50 8,56 1828,58 -6.28 0.97 8.65 8.71 1839,58 -6,42 0,94 8,80 8,85 1850,63 -6,57 0.89 8,95 9,00 1861,63 -6,72 0,84 9.10 9.14 1872,67 -6.87 0,78 9.25 9.28 1883,72 -7,02 0.72 9.39 9.42 81,85 81.91 81,99 82.12 82.28 82,48 82,70 82.96 83,25 83.57 83,93 84.33 84,75 85,16 85.61 1894,72 -7,19 0,65 9,55 9,57 86,10 1905,67 -7,36 0,58 9,71 9,73 86.60 1916,62 -7,53 0,50 9,87 9,88 87,07 1927.62 -7,6.9 0,43 10,01 10,02 87,53 1938,57 -7.85 0.36 10.16 10.16 87.96 1949,52 -8.00 0.29 10,30 10.30 88.37 1960,51 -8,15 0,23 10,43 10,44 88,75 1971.56 -8,29 0,17 10,56 10,56 89,09 1982,61 -8.42 0.11 10,68 10,68 89,39 1993,61 -8,54 0,07 10,80 10,80 89,65 0.08 0.39 0,39 0.31 0.26 0,27 0,49 0.34 0.30 0,39 0,57 0.36 0,08 0.27 0.56 0,74 0,10 0,37 0,47 0.06 0.12 0,64 0,47 0,24 0,36 Srvy tool type GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO Tool qual type [(c)1999 Anadrill IDEAL ID6 0C 04] -- -- ANADRILL SCHLUMBERGER Survey Report 2-Sep-1999 23:37:55 Page 8 of 15 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 181 2004.73 0.57 108.70 182 2015.73 0,50 109.47 183 2026.83 0.45 113.18 184 2037.83 0.38 114.60 185 2048.83 0.32 113.88 11.05 11.00 11.10 11.00 11.00 186 2059.93 0.25 113.08 187 2070.93 0.13 113.71 188 2081.98 0.05 179.17 189 2092.98 0.12 215.66 190 2103.93 0.17 184.55 11.10 11,00 11.05 11.00 10.95 191 2114.93 0.17 175.98 192 2125.88 0.13 144.77 193 2136.88 0,17 85.33 194 2147.88 0.25 38.13 195 2158.88 0.42 12.40 11.00 10.95 11.00 11.00 11.00 196 2169.98 0.62 356.29 197 2181.08 0,77 349.15 198 2192.08 0.87 345.53 199 2203.18 0.92 343.22 200 2214.23 0.93 341.50 11.10 11.10 11.00 11.10 11.05 201 2225.28 0.93 340.13 ~02 2236.33 0.93 339.31 203 2247.38 0.95 338.54 204 2258.43 0.97 338.06 205 2269.48 0.97 337.87 11.05 11.05 11.05 11.05 11.05 206 2280.53 0.97 337.68 207 2291.53 0.98 336.52 208 2302,53 0.97 330.51 209 2313.53 0.90 326.00 210 2324.43 0.85 327.45 11.05 11.00 11.00 11.00 10.90 TVD depth (ft) 2004.66 2015.66 2026.76 2037.76 2048.76 2059.86 2070.86 2081.91 2092.91 2103.86 2114.86 2125.81 2136.81 2147.81 2158.81 2169.91 2181.01 2192.01 2203,11 2214.15 2225.20 2236.25 2247.30 2258.35 2269.40 2280.45 2291.44 2302.44 2313.44 2324.34 Vertical Displ Displ Total At DLS Srvy Tool section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (deg) 100f) type type -8.65 0.03 -8.75 -0.01 -8.84 -0,04 -8.91 -0.07 -8.98 -0.10 -9.03 -0.12 -9.07 -0.14 -9.08 -0.15 -9.09 -0.16 -9.10 -0.19 -9.12 -0.22 -9.14 -0.25 -9.16 -0.25 -9.18 -0.23 -9.16 -0.18 -9.10 -0.08 -9.01 0.06 -8.89 0.21 -8,75 0.38 -8.60 0.55 -8.45 0.72 -8.30 0.88 -8.15 1~05 -7.99 1.23 -7.83 1.40 -7.66 1.57 -7.50 1.74 -7,33 1.91 -7.17 2.06 -7.01 2.20 10.91 11.01 11.09 11.17 11,23 11.28 11.31 11.32 11.32 11.31 11.31 11.32 11.34 11.37 11.39 11.40 11.38 11.35 11.30 11,25 11.19 11.12 11,06 10.99 10.92 10.85 10.78 10.69 10,60 10.51 10.91 11.01 11.09 11.17 11,23 11.28 11.31 11.32 11.32 11.31 11.31 11.32 11.34 11.37 11,40 11.40 11.38 11.35 11.31 11.26 11,21 11.16 11.11 11.06 11.01 10,96 10.92 10.86 10.80 10.74 89.86 90,04 90,21 90.38 90.51 90.62 90.70 90.74 90.82 90.95 91.11 91.24 91.29 91.18 90.89 90.38 89.71 88.94 88.09 87.21 86.34 85.45 84.56 83.64 82.70 81.75 80.80 79.86 78,98 78,15 0.76 0.64 0.53 0.64 0.55 0.63 1.09 1.07 0.77 0.84 0.23 0.82 1.39 1.67 2.03 2.22 1.56 1.02 0.56 0.27 0.20 0,12 0.21 0.20 0.03 0,03 0.20 0.93 0.92 0.5O GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO [(c)1999 Anadrill IDEAL ID6 0C 04] ANADRILL SCHLUMBERGER Survey Report Seq Measured Incl Azimuth # depth angle angle - (ft) (deg) (deg) 211 2335.43 0.85 329.39 212 2346,43 0.83 331,86 213 2357.48 0.83 333.98 214 2368.53 0,87 335,13 215 2379.53 0,90 335.91 Course length (ft) 11,00 11,00 11.05 11,05 11,00 216 2390,58 0,90 336,78 217 2401,63 0,88 337,69 218 2412,68 0,87 338,95 219 2423.68 0.85 342.32 220 2434,68 0,83 346,75 11,05 11,05 11,05 11.00 11,00 221 2445,78 0,83 349,97 222 2456.78 0,85 352,04 223 2467,78 0,93 352,66 224 2478.78 0,98 352,79 225 2489,78 1,02 353,85 11,10 11.00 11,00 11,00 11,00 226 2500,68 1.02 354,52 227 2511,68 1,02 354,06 228 2522.68 1,03 352.78 229 2533,63 1.05 351.12 230 2544,58 1,03 351,16 10.90 11,00 11,00 10,95 1.0,95 231 2555,63 1,02 352,10 232 2566.68 1.00 352.29 233 2577,73 1.02 353,48 234 2588.73 1.05 355,12 235 2599,68 1,10 356,17 11,05 11,05 11,05 11.00 10,95 236 2610,53 1,13 357,12 237 2621,43 1,18 358,67 238 2632,33 1,25 359.83 239 2643,13 1,30 0,45 240 2654,03 1,37 1.31 10,85 10,90 10,90 10,80 10.90 2-Sep-1999 23:37:55 Page TVD Vertical Displ Displ Total At depth section +N/S- +E/W- displ Azim (ft) (ft) (ft) (ft) (ft) (deg) 9 of 15 DLS (deg/ 100f) Srvy tool type 2335,34 -6,86 2,34 10,42 10,68 77,33 0,26 GYRO 2346.34 -6.71 2.48 10.34 10,64 76,50 0.38 GYRO 2357,39 -6,56 2,63 10,27 10,60 75,66 0,28 GYRO 2368,43 -6.42 2,77 10,20 10,57 74.79 0.39 GYRO 2379,43 -6,27 2,93 10,13 10,54 73,87 0,29 GYRO 2390,48 -6.12 3,09 10,06 10,52 72.94 0,12 GYRO 2401.53 -5.97 3.25 9.99 10,51 72.01 0.22 GYRO 2412,58 -5,82 3,40 9,93 10,50 71,09 0,20 GYRO 2423,58 -5,68 3,56 9,88 10,50 70,19 0,49 GYRO 2434,58 -5,56 3,71 9.83 10,51 69,31 0,62 GYRO 2445.68 -5,43 3.87 9.80 10,54 68.45 0.42 GYRO 2456,67 -5,32 4,03 9,78 10.57 67,59 0,33 GYRO 2467.67 -5.20 4,20 9.75 10.62 66.70 0.73 GYRO 2478,67 -5,07 4,38 9.73 10,67 65,76 0.45 GYRO 2489,67 -4,93 4,57 9,71 10.73 64,78 0,40 GYRO 2500.57 -4,80 4,77 9.69 10,80 63,81 0,11 2511.57 -4.67 4,96 9,67 10,87 62,84 0.07 2522,56 -4,53 5.16 9,65 10,94 61,88 0,23 2533,51 -4.39 5.35 9.62 11.01 60.90 0.33 2544,46 -4,25 5.55 9,59 11,08 59,94 0,18 2555,51 -4.10 5,74 9,56 11,15 59,00 0,18 2566.56 -3.9'7 5,94 9,53 11,23 58,08 0.18 2577,61 -3,83 6,13 9,51 11,31 57,19 0,26 2588,60 -3,69 6,33 9,49 11,40 56,30 0,38 2599,55 -3,56 6,53 9,47 11,51 55,41 0.49 GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO GYRO 2610,40 -3,42 6,74 9.46 11,62 54,52 0.32 GYRO 2621,30 -3,28 6,96 9,45 11,74 53,62 0.54 GYRO 2632,20 -3,14 7,19 9.45 11,88 52,72 0,68 GYRO 2642,99 -2,99 7,43 9,45 12,02 51,81 0,48 GYRO 2653,89 -2,84 7,69 9,45 12,19 50,88 0,67 GYRO Tool qual type [(c)1999 Anadrill IDEAL ID6 0C 04] ANADRILL SCHLUMBERGER Survey Report Seq 241 242 243 244 245 Measured Incl Azimuth depth angle angle (ft) (deg) (deg) 2664.83 1.42 1.74 2670.00 2.20 5.20 2700.00 5.09 354.30 2730.00 6.92 356.00 2760.00 8.47 354.45 Course length (ft) 10.80 5.17 30.00 30.00 30.00 246 2782.00 9.84 352.16 247 2818.22 12.17 351.60 248 2849.49 14.07 350.62 249 2880.34 14.91 348.84 250 2910.95 15.24 340.88 22.00 36.22 31.27 30.85 30.61 251 2941.91 15.51 337.60 252 2976.51 17.58 331.84 253 3003.85 17.56 331.91 254 3035.40 19.27 329.59 255 3067.75 19.17 328.16 30.96 34.60 27.34 31.55 32.35 256 3099.11 21.39 325.08 257 3131.66 23.48 323.68 258 3162.68 23.35 322.13 259 3193.13 25.30 320.17 260 3225.28 28.49 319.38 31.36 32.55 31.02 30.45 32.15 31.93 30.47 32.09 31.45 29.25 261 3257.21 29.42 319.51 962 3287.68 31,49 319.31 263 3319.77 34.18 319.78 264 3351.22 34.68 319.09 265 3380.47 37.14 319.09 266 3472.90 40.02 319.33 267 3566.85 42.05 315.74 268 3660.19 44.39 314.12 269 3754.10 44.25 313.41 270 3847.85 42.93 312.73 92.43 93.95 93.34 93.91 93.75 2-Sep-1999 23:37:55 TVD Vertical Displ Displ Total depth section +N/S- +E/W- displ (ft) (ft) (ft) (ft) (ft) 2664.69 -2.69 7.95 9.46 12.36 2669.85 -2.60 8.11 9.47 12.47 2699.79 -1.38 10.01 9.39 13.73 2729.63 0.72 13.14 9.13 16.00 2759.35 3.43 17.14 8.79 19.27 2781.07 2816.63 2847.08 2876.95 2906.51 2936.36 2969.53 2995.59 3025.52 3056.07 3085.49 3115.57 3144.04 3171.78 3200.45 3228.39 3254.66 3281.62 3307.56 3331.25 3403.49 3474.37 3542.38 3609.57 3677.47 Page At Azim (deg) 49.95 49.41 43.17 34.80 27.16 5.86 20.62 8.38 22.26 22.12 10.80 27.46 7.40 28.44 15.08 15.93 34.47 6.30 35.04 10.36 21.64 42.07 4.92 42.35 6.67 27.95 49.73 2.84 49.81 3.27 34.92 57.40 -0.07 57.40 43.68 66.29 -4.30 66.43 51.19 73.57 -8.19 74.02 60.34 82.26 -13.07 83.29 70.25 91.37 -18.57 93.24 359.93 356.29 353.65 350.97 348.51 80.52 100.44 -24.56 103.40 346.26 92.40 110.53 -31.80 115.01 343.95 104.27 120.36 -39.24 126.60 341.95 116.46 130.12 -47.11 138.39 340.10 130.66 141.22 -56.50 152.11 338.19 145.78 152.97 -66.55 166.82 336.49 160.88 164.69 -76.60 181.64 335.06 177.89 177.93 -87.89 198.46 333.71 195.28 191.44 -99.45 215.73 332.55 212.08 204.41 -110.69 232.45 331.56 268.49 248.04 -148.33 289.01 329.12 329.19 293.50 -189.99 349.63 327.08 392.56 338.62 -235.25 412.32 325.21 457.76 384.01 -282.63 476.80 323.65 522.08 428.15 -329.85 540.47 322.39 10 of 15 DLS (deg/ 100f) 0.47 15.23 9.86 6.13 5.21 6.44 6.44 6.12 3.08 6.84 2.94 7.63 0.11 5.9O 1.49 7.85 6.63 2.03 6.93 9.98 2.92 6.80 8.42 2.02 8.41 3.12 3.31 2.77 0.55 1.49 S rvy tool type TIP GYRO GYRO GYRO GYRO GYRO MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD Tool qual type 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis [(c)1999 Anadrill IDEAL ID6 0C 04] , ANADRILL SCHLUMBERGER Survey Report 2-Sep-1999 23:37:55 Page 11 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool qual - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type 271 3941.45 40.48 313.33 93.60 3747.35 584.05 470.63 -375.37 602.00 321.42 2.65 MWD 6-axis 272 4034.36 40.09 314.59 92.91 3818.23 643.73 512.33 -418.61 661.60 320.75 0.97 MWD 6-axis 273 4127.77 39.72 314.63 93.41 3889.88 703.18 554.41 -461.27 721.21 320.24 0.40 MWD 6-axis 274 4219.58 39.76 317.92 91.81 3960.49 761.15 596.82 -501.83 779.76 319.94 2.29 MWD 6-axis 275 4311.41 39.89 318.95 91.83 4031.01 818.88 640.82 -540.85 838.55 319.84 0.73 MWD 6-axis 276 4402.98 39.20 318.33 91.57 4101.62 876.06 684.58 -579.37 896.84 319.76 0.87 MWD 6-axis 277 4495.96 40.41 319.65 92.98 4173.05 934.36 729.50 -618.42 956.35 319.71 1.59 MWD 6-axis 278 4591.03 40.63 319.97 95.07 4245.32 994.69 776.68 -658.28 1018.12 319.72 0.32 MWD 6-axis 279 4685.52 40.03 320.56 94.49 4317.36 1054.31 823.71 -697.37 1079.27 319.75 0.75 MWD 6-axis 280 4778.35 39.34 319.83 92.83 4388.80 1112.11 869.25 -735.32 1138.55 319.77 0.90 MWD 6-axis 281 4872.01 40.80 320.02 93.66 4460.47 1170.96 915.38 -774.13 1198.84 319.78 1.56 MWD 6-axis 282 4965.35 40.90 319.47 93.34 4531.07 1230.60 961.98 -813.58 1259.89 319.78 0.40 MWD 6-axis 283 5058.96 40.76 319.98 93.61 4601.90 1290.40 1008.67 -853.15 1321.09 319.78 0.39 MWD 6-axis 284 5151.18 40.28 320.43 92.22 4672.01 1348.82 1054.71 -891.50 1381.01 319.79 0.61 MWD 6-axis 285 5244.43 39.71 319.64 93.25 4743.45 1407.30 1100.64 -929.99 1440.94 319.80 0.82 MWD 6-axis 286 5337.56 40.83 319.57 93.13 4814.50 1466.14 1146,49 -969.00 1501.13 319.80 1.20 MWD 6-axis 287 5430.70 41.04 319.32 93.14 4884.87 1525.82 1192.85 -1008.68 1562.16 319.78 0.29 MWD 6-axis 288 5523.73 40.61 320.17 93.03 4955.26 1585.23 1239.27 -1047.98 1622.98 319.78 0.76 MWD 6-axis 289 5619.31 40.63 320.17 95.58 5027.81 1645.92 1287.05 -1087.84 1685.20 319.80 0.02 MWD 6-axis 290 5712.71 40.17 319.08 93.40 5098.94 1705.08 1333.17 -1127.05 1745.73 319.79 0.90 MWD 6-axis 291 5807.20 40.03 317.68 94.49 5171.22 1764.83 1378.67 -1167.47 1806.58 319.74 0.97 MWD 6-axis 292 5893.75 41.75 316.85 86.55 5236.65 1820.64 1420.28 -1205.92 1863.18 319.67 2.08 MWD 6-axis 293 5987.05 42.34 316.09 93.30 5305.93 1882.34 1465.57 -1248.96 1925.57 319.56 0.84 MWD 6-axis 294 6080.39 42.07 315.44 93.34 5375.08 1944.38 1510.50 -1292.70 1988.14 319.44 0.55 MWD 6-axis 295 6172.93 42.01 316.61 92.54 5443.80 2005.65 1555.10 -1335.72 2050.00 319.34 0.85 MWD 6-axis 296 6266.25 42.03 316.61 93.32 5513.13 2067.31 1600.49 -1378.64 2112.39 319.26 0.02 MWD 6-axis 297 6357.85 41.99 315.92 91.60 5581.19 2127.88 1644.79 -1421.02 2173.62 319.17 0.51 MWD 6-axis 298 6451.93 41.95 315.89 94.08 5651.14 2190.10 1689.97 -1464.80 2236.43 319.08 0.05 MWD 6-axis 299 6546.22 42.02 316.90 94.29 5721.23 2252.40 1735.63 -1508.31 2299.44 319.01 0.73 MWD 6-axis 300 6640.59 41.74 317.28 94.37 5791.49 2314.50 1781.78 -1551.20 2362.40 318.96 0.40 MWD 6-axis [(c) 1999 Anadrill IDEAL ID6 0C 04] ANADRILL SCHLUMBERGER Survey Report 2-Sep-1999 23:37:55 Page 12 of 15 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) TVD Vertical Displ depth section +N/S- (ft) (ft) (ft) Disp1 Total At DLS Srvy Tool +E/W- displ Azim (deg/ tool qual (ft) (ft) (deg) 100f) type type 301 6732.86 41.32 320.35 92.27 5860.57 2374.45 1827.80 -1591.48 2423.56 318.95 2.25 302 6827.69 41.08 320.33 94.83 5931.93 2435.33 1875.89 -1631.34 2486.01 318.99 0.25 303 6922.47 41.06 320.27 94.78 6003.38 2496.03 1923.80 -1671.12 2548.26 319.02 0.05 304 7015.71 40.93 320.48 93.24 6073.75 2555.63 1970.91 -1710.13 2609.41 319.05 0.20 305 7108.20 40.82 320.02 92.49 6143.69 2614.64 2017.44 -1748.83 2669.92 319.08 0.35 MWD 6-axis MWD 6-axis MWD 6-axis MWD 6-axis MWD 6-axis 306 7200.81 40.73 319.26 92.61 6213.82 2673.75 2063.53 -1788.00 2730.40 319.09 0.54 307 7294.87 40.70 320.13 94.06 6285.12 2733.69 2110.32 -1827.68 2791.75 319.11 0.60 , 308 7388.50 40.71 320.01 93.63 6356.10 2793.27 2157.14 -1866.88 2852.80 319.13 0.08 309 7480.92 40.09 320.11 92.42 6426.48 2851.71 2203.07 -1905.33 2912.69 319.15 0.67 310 7573.89 38.40 320.56 92.97 6498.47 2909.03 2248.34 -1942.87 2971.50 319.17 1.84 MWD 6-axis MWD 6-axis MWD 6-axis MWD 6-axis MWD 6-axis 311 7666.34 37.28 321.10 92.45 6571.48 2964.20 2292.31 -1978.70 3028.19 319.20 1.26 312 7761.79 35.19 321.53 95.45 6648.47 3018.96 2336.34 -2013.97 3084.57 319.24 2.21 313 7855.02 34.42 321.22 93.23 6725.02 3070.60 2377.91 -2047.18 3137.74 319.27 0.85 314 7948.22 34.20 322.05 93.20 6802.00 3121.52 2419.10 -2079.79 3190.23 319.31 0.55 315 8041,06 33.83 321.88 92.84 6878.96 3171.78 2460.01 -2111.79 3242.11 319.36 0.41 MWD 6-axis MWD 6-axis MWD 6-axis MWD 6-axis MWD 6-axis 316 8135.45 32.98 321.97 94.39 6957.75 3222.09 2500.92 -2143.83 3294.03 319.40 0.90 317 8226.03 33.03 323.25 90.58 7033.72 3269.70 2540.12 -2173.79 3343.29 319.44 0.77 318 8318.74 32.43 323.24 92.71 7111.71 3317.92 2580.28 -2203.79 3393.31 319.50 0.65 319 8418.19 31.98 324.47 99.45 7195.86 3368.75 2623.08 -2235.05 3446.16 319.57 0.80 320 8506.80 31.42 324.72 88.61 7271.25 3413.23 2661.03 -2262.03 3492.54 319.63 0.65 MWD 6-axis MWD 6-axis MWD 6-axis MWD 6-axis MWD 6-axis 321 8599.06 30.81 324.58 92.26 7350.23 3458.76 2699.91 -2289.61 3540.04 319.70 0.67 322 8692.60 30.21 325.00 93.54 7430,82 3504.08 2738.71 -2316.99 3587.34 319.77 0.68 323 8786.51 30.03 325.77 93.91 7512.05 3548.90 2777.49 -2343.76 3634.24 319.84 0.45 324 8881.20 30.03 323.72 94.69 7594.04 3594.13 2816.19 -2371.11 3681.45 319.90 1.08 325 8972.62 30.24 325.01 91.42 7673.10 3638.03 2853.49 -2397.85 3727.21 319.96 0.74 MWD 6-axis MWD 6-axis MWD 6-axis MWD 6-axis MWD 6-axis 326 9065.93 30.87 324.43 93.31 7753.45 3683.31 2892.21 -2425.25 3774.48 320.02 0.75 MWD 6-axis 327 9160.50 31.23 325.26 94.57 7834.47 3729.84 2932.09 -2453.33 3823.09 320.08 0.59 MWD 6-axis 328 9254.11 30.57 325.53 93.61 7914.80 3775.56 2971,66 -2480.64 3870.96 320.15 0.72 MWD 6-axis 329 9346.88 29.68 325.65 92.77 7995.04 3819.80 3010.07 -2506.95 3917.31 320.21 0.96 MWD 6-axis 330 9440.60 28.69 328,13 93.72 8076.86 3862.88 3048.33 -2531.92 3962.69 320.29 1.67 MWD 6-axis [(c) 1999 Anadrill IDEAL ID6 0C 04] , ANADRILL SCHLUMBERGER Survey Report Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 331 9533.55 29.94 325.45 332 9627.03 29.35 324.90 333 9721.11 30.12 325.50 334 9814.34 30.05 325.50 335 9908.50 30.00 326.44 92.95 93.48 94.08 93.23 94.16 336 10001.68 28.75 327.49 337 10093.62 27.63 328.29 338 10105.91 27.39 327.55 339 10169.03 27.55 327.55 340 10198.45 30.91 324.64 93.18 91.94 12.29 63.12 29.42 341 10228.91 38.06 321.63 342 10259.94 45.38 318.57 343 10289.39 51.77 315.46 344 10321.03 59.21 312.46 345 10352.37 66.50 308.34 30.46 31.03 29.45 31.64 31.34 346 10383.44 72.16 305.65 347 10411.94 70.65 298.86 348 10446.92 69.96 289.20 349 10476.81 75.09 283.79 350 10512.63 83.47 283.22 31.07 28.50 34.98 29.89 35.82 351 10539.84 84.16 283.28 352 10570.24 84.68 287.36 353 10603.04 86.02 289.28 354 10634.07 87.43 290.42 355 10663.15 87.29 290.45 27.21 30.40 32.80 31.03 29.08 356 10696.90 87.19 289.84 357 10727.89 87.22 289.98 358 10757.17 87.26 289.68 359 10788.56 87.43 290.98 360 10819.31 86.33 292.04 33.75 30.99 29.28 31.39 30.75 TVD depth (ft) 8157.91 8239.15 8320.84 8401.51 8483.04 8564.24 8645.27 8656.17 8712.18 8737.85 8762.94 8786.09 8805.57 8823.48 8837.78 8848.74 8857.84 8869.65 8878.63 8885.29 8888.22 8891.18 8893.84 8895.61 8896.95 8898.57 8900.08 8901.49 8902.95 8904.62 2-Sep-1999 23:37:55 Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) 3905.80 3949.83 3994.26 4038.68 4083.34 3086.39 3124.34 3162.66 3201.18 3240.22 -2556.86 -2583.26 -2609.89 -2636.36 -2662.72 4126.41 4167,09 4172.41 4199.74 4213.35 3278.53 3315.32 3320.13 3344.70 3356.61 -2687.65 -2710.74 -2713.75 -2729.37 -2737.40 4229.95 4250.08 4271.84 4297.73 4325.55 3370.37 3386.17 3402.29 3420.35 3438.38 -2747.77 -2761.04 -2776.10 -2794.87 -2816.11 4354.60 4381.49 4413.48 4440.09 4472.24 3455.86 3470.27 3483.67 3491.74 3499.95 -2839.32 -2862.15 -2892.18 -2919.50 -2953.69 4496.92 4524.95 4555.85 4585.38 4613.17 3506.15 3514.14 3524.41 3534.93 3545.07 -2980.02 -3009.20 -3040.23 -3069.37 -3096.59 4645.36 4674.88 4702.77 4732.74 4762.27 3556.68 3567.23 3577.15 3588.04 3599.30 -3128.24 -3157.34 -3184,85 -3214.26 -3242.82 Page Total disp1 (ft) At Azim (deg) 320.36 320.42 320.47 320.53 320.59 4007.90 4053.98 4100.48 4147.04 4193.94 4239.37 4282.46 4288.09 4317.00 4331.30 4348.52 4369.15 4391.16 4417.03 4444.43 4472.66 4498.29 4527.76 4551.45 4579.73 4601.48 4626.49 4654.51 4681.54 4707.06 4736.65 4763.81 4789.50 4817.21 4844.67 320.66 320.73 320.74 320.78 320.80 320.81 320.81 320.79 320.75 320.68 320.59 320.49 320.30 320.10 319.84 319.64 319.43 319.22 319.03 318.86 318.67 318.49 318.32 318.15 317.98 13 of 15 DLS (deg/ 100f) 1.95 0.70 0.88 0.08 0.50 1.45 1.29 3.40 0.25 12.40 24.12 24.48 23.09 24.77 26.03 19.93 23.19 26.07 24.34 23.45 2.55 13.47 7.12 5.84 0.49 1.83 0.46 1.03 4.17 4.96 Srvy tool t~e MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD M'WD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD Tool qual type 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis [(c) 1999 Anadrill IDEAL ID6 0C 04] ANADRILL SCHLUMBERGER Survey Report 2-Sep-1999 23:37:55 Page 14 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool qual - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type 361 10848.45 86.23 292.72 29.14 8906.51 4790.36 3610.37 -3269.71 4870.91 317.83 2.35 MWD 6-axis 362 10881.71 86.29 292.55 33.26 8908.68 4822.45 3623.14 -3300.34 4900.96 317,67 0.54 MWD 6-axis 363 10913.90 86.13 291.98 32.19 8910.81 4853,45 3635.31 -3330.07 4929.99 317.51 1.84 MWD 6-axis 364 10943.21 86.02 292.46 29.31 8912.82 4881.68 3646.37 -3357,14 4956.45 317.36 1.68 MWD 6-axis 365 10978.77 85.81 291.22 35.56 8915.35 4915.84 3659.57 -3390.06 4988.48 317.19 3.53 MWD 6-axis 366 11010.46 85.89 291.38 31.69 8917.64 4946.21 3671.05 -3419.51 5016.93 317.03 0.56 MWD 6-axis 367 11036.13 85.92 291.38 25.67 8919.48 4970.82 3680.38 -3443.35 5040.03 316.91 0.12 MWD 6-axis 368 11073.29 85.02 291.42 37.16 8922.41 5006.43 3693.90 -3477.84 5073.48 316.73 2.42 MWD 6-axis 369 11104.64 83.58 288.58 31.35 8925.52 5036.19 3704.57 -3507.15 5101.36 316.57 10.12 MWD 6-axis 370 11132.11 83.40 288.35 27.47 8928.64 5062.01 3713.21 -3533.04 5125.45 316.42 1.06 MWD 6-axis 371 11163.52 83.30 289.57 31.41 8932,28 5091.61 3723.35 -3562.54 5153.16 316.26 3.87 MWD 6-axis 372 11197.89 83.06 289.59 34.37 8936.36 5124.10 3734.78 -3594.70 5183.67 316.09 0.70 MWD 6-axis 373 11223.25 82.51 288.61 25.36 8939.54 5147.98 3743.02 -3618.47 5206.10 315,97 4.40 MWD 6-axis 374 11260.47 81.88 287.55 37.22 8944.60 5182.78 3754.46 -3653.52 5238.72 315.78 3.29 MWD 6-axis 375 11292.04 81.67 287.86 31.57 8949.11 5212.20 3763.96 -3683.29 5266.31 315.62 1.18 MWD 6-axis 376 11318.32 81.61 288.77 26.28 8952.94 5236.77 3772.13 -3707.97 5289.43 315.49 3.43 MWD 6-axis 377 11352.30 81.30 289.40 33.98 8957.98 5268.67 3783.12 -3739.73 5319.54 315.33 2.05 MWD 6-axis 378 11382.56 81.26 289.20 30.26 8962.57 5297.10 3793.01 -3767.96 5346.44 315.19 0.67 MWD 6-axis 379 11412.26 80.92 289.18 29.70 8967.17 5324.97 3802.65 -3795.67 5372.82 315.05 1.15 MWD 6-axis 380 11445.25 80.46 288.18 32.99 8972.51 5355.80 3813.08 -3826.51 5402.01 314,90 3.30 MWD 6-axis 381 11477.28 80.40 288.20 32.03 8977.83 5385.63 3822.94 -3856.51 5430.24 314.75 0.20 MWD 6-axis 382 11505.68 80.33 289.18 28.40 8982.59 5412.15 3831.91 -3883.04 5455.41 314.62 3.41 MWD 6-axis 383 11536.88 80.15 289.06 31.20 8987.88 5441.35 3841.98 -3912.09 5483.18 314.48 0.69 MWD 6-axis 384 11567.94 80.94 286.96 31.06 8992.98 5470.24 3851.45 -3941.22 5510.62 314.34 7.14 MWD 6-axis 385 11597.88 82.75 288,49 29.94 8997.23 5498.15 3860.47 -3969.45 5537.13 314.20 7.88 MWD 6-axis 386 11629.69 83.54 288.02 31.81 9001.02 5527.98 3870.37 -3999.44 5565.55 314.06 2.88 MWD 6-axis 387 11664.18 85.33 288.60 34.49 9004.37 5560.42 3881.15 -4032.03 5596.48 313.91 5.45 MWD 6-axis 388 11691.04 85.95 287,72 26.86 9006.41 5585.71 3889.50 -4057.48 5620.62 313.79 4.00 MWD 6-axis 389 11722.64 89.31 288.93 31.60 9007.72 5615.54 3899.42 -4087.45 5649.14 313.65 11.30 MWD 6-axis 390 11757.81 90.24 290.25 35.17 9007.85 5649.03 3911.22 -4120.58 5681.27 313.51 4.59 MWD 6-axis [(c) 1999 Anadrill IDEAL ID6_0C_04] ANADRILL SCHLUMBERGER Survey Report 2-Sep-1999 23:37:55 Page 15 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ # depth angle angle length depth section +N/S- +E/W- - (ft) (deg) (deg) (ft) (ft) (ft) ., (ft) (ft) 391 11784.40 90.75 288.26 26.59 9007.62 5674.29 3919.98 -4145.68 392 11819.61 94.60 288.93 35.21 9005.98 5707.58 3931.20 -4179.01 393 11850.83 95.49 289.45 31.22 9003.24 5737.12 3941.42 -4208.38 394 11878.05 95.35 289.97 27.22 9000.67 5762.94 3950.56 -4233.89 395 11912.26 94.87 289.29 34.21 8997.62 5795.38 3962.00 -4265.98 396 11943,73 94,80 289,72 397 11972.36 95,01 289.80 398 12005,83 95,11 290,81 399 12037.75 95,49 290,46 400 12064,79 95,39 291,01 31,47 28.63 33.47 31,92 27,04 401 12097.35 95,39 291,23 402 12128,46 95,63 291,06 403 12158,30 95,98 289,46 404 12189,93 96,42 289.65 405 12224.23 96.42 289,79 8994,97 8992,52 8989.57 8986,62 8984.05 406 12252.18 96.49 290,40 407 12284.43 96,56 289,28 408 12315,06 96,66 289,76 409 12344.63 96,32 288.38 410 12376,67 96,60 288,93 5825,23 3972,47 -4295,54 5852,41 3982,12 -4322,39 5884,28 3993,69 -4353,65 5914,71 4004,89 -4383,40 5940,50 4014,42 -4408.57 411 12411,38 96,77 289,66 412 12440.19 96,63 288,79 413 12473,70 95,15 286,06 414 12505.30 95,29 286.14 415 12531,42 95,53 286,38 32.56 8981,00 5971,61 4026,10 -4438,81 31,11 8978,01 6001,34 4037,27 -4467,69 29,84 8974.99 6029.71 4047,55 -4495,54 31,63 8971,57 6059,64 4058,07 -4525,17 34.30 8967,74 6092,12 4069,58 -4557,26 416 12624,73 95,46 287,67 417 12643.81 95,53 288,54 27.95 8964.60 6118,63 4079~t2 -45.83.34 · 32.25 8960,93 6149,18 4089,99 -4613,48 30,63 8957,41 6178,13 4100,16 -4642,16 29.57 8954.06 6206,02 4109,76 -4669.92 32,04 8950,46 6236,17 4119,94 -4700,09 Survey Projected to TD: 418 12699.00 95,53 288,54 34,71 8946,42 6268,94 4131,33 -4732,63 28.81 8943,06 6296,12 4140,75 -4759,64 33,51 8939,62 6327,45 4150,73 -4791,44 31,60 8936,74 6356,77 4159,46 -4821,68 26,12 8934.28 6381.02 4166.74 -4846,64 93.31 19,08 8925.34 6468.09 4193,94 -4935.45 8923,52 6486,01 4199,84 -4953,50 8918,20 55,19 6538,00 4217,30 -5005,58 Total At DLS displ Azim (deg/ (ft) (deg) 100f) 5705,52 313,40 7,73 5737.46 313,25 11.10 5765,87 313,12 3,30 5790,75 313,02 1.97 5822,04 312,88 2,43 5850,83 312,76 1.38 5877,10 312,65 0.78 5907.95 312,53 3,02 5937,45 312,42 1,62 5962,47 312.32 2,06 5992,71 312,21 0,67 6021,61 312,10 0,94 6049,18 312,00 5.46 6078,25 311,89 1,51 6109,83 311.76 0,41 6135,65 311.67 2,18 6165.41 311.56 3,46 6193,62 311,45 1.59 6220.80 311.35 4.78 6250,18 311,24 1.92 6282,17 311,12 2,15 6308,73 311,02 3,04 6339,28 310,90 9,23 6367,86 310.78 0,51 6391,53 310,69 1.30 6476,71 310,36 1,38 6494,29 310,29 4,55 6545,34 310,11 0,00 Srvy tool type MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD Tool qual type 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis [(c) 1999 Anadrill IDEAL ID6_0C_04] :,,,:,, ....,,, MEMORANDUM TO: State of Alaska Alaska Oil and Gas Conservation Commission Robert Christenson//r~ DATE: August 8, 1999 Chairman L~' THRU: Blair Wondzell, ,~~ FILE NO: P. I. Supervisor FROM: Chuck Scheve, ~~ SUBJECT: Petroleum Inspector afskhhgf, doc BOPE Test Nabors 9ES PBU S-24A PTD # 98-245 Sunday, August 8, 1999: I traveled to BPXs S Pad Well 24A and witnessed the initial BOPE test on Nabors Rig 9ES. As the attached AOGCC BOPE Test Report indicates, the test lasted 2.5 hours and there were no failures. The lower pipe rams were not tested at this time due to the length of the cross-overs required to engage the tubing hanger. The above mentioned rams were tested by the rig crew when the production tubing had been laid down. The testing went very well with the test procedure being practiced by the Nabors crew allowing the testing to be completed in a minimum number of steps. The rig was very clean and all equipment appeared to be in excellent condition. The location was clean and all extra equipment was properly stored. Summ~ry: I witnessed the initial BOPE test on Nabors Rig 9ES drilling BPXs S- 24A Well. NABORS 9ES, 8~8~99, Test Time 2.5 Hours, No Failures Attachment: afskhhgf.xls X Unclassified Confidential (Unclassified if doc. removed ) STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: Test: Initial X Workover: NABORS Rig No. SSD S-24Ai Set @ X Weekly Other 9ES PTD # Rep.: Rig Rep.: Location: Sec. DATE: 8/8/99 98-245 Rig Ph.# 659-4831 John Rawl Bixby / Klepzig 35 T. 12N R. 12E Meridian Urn. MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) PTD On Location YES Standing Order Posted YES Well Sign OK Drl. Rig OK Hazard Sec. YES BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. 1 Test Press. P/F 250/3500 P 250/4000 P 250/4000 P 250/4000 P 250/4000 P 250/4000 P N/A !M UD SYSTEM: Visual Alarm Trip Tank OK OK Pit Level Indicators OK OK Flow Indicator OK OK Meth Gas Detector OK OK H2S Gas Detector OK OK FLOOR SAFETY VALVES: Upper Kelly/IBOP Lower Kelly/IBOP Ball Type Inside BOP Test Quart. Pressure P/F 1 250 / 4000 P 250/4000 P 250/4000 P 250/4000 P CHOKE MANIFOLD: No. Valves '/4 No. Flanges 32 Manual Chokes '/ Hydraulic Chokes '/ Test Pressure P/F 250/4,000 P 250/4,000 P Functioned Functioned ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: 6 @2100 3,000 P 1,750 P 0 minutes 20 sec. minutes 45 sec. YES Remote: YES Number of Failures: 0 ,Test Time: (2.5) Hours. Number of valves tested 23 . Repair or Replacement of Failed Equipment will be made within 0 ~ Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Lower pipe rams to be tested when tubing is layed down. · Distribution: orig-Well File c- Oper./Rig c- Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: Chuck Scheve F1-021L (Rev. 12194) afskhhgf.xls TONY KNOWLE$, GOVEFINOFI ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 August 2, 1999 Dan Stone Senior Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bav Unit S-24Ai Rev. BP Exploration (Alaska) Inc. Permit No: 98-245 Sur Loc: 1633'SNL. 1050'EWL. Sec. 35, T12N, R12E, UM Btmhole Loc. 2486'NSL. 4319'WEL, Sec. 27, T12N. R12E. USM Dear Mr. Stone: Enclosed is the approved revised application for permit to drill the above referenced well. The revision is for a change in bottom-hole location. The provisions of the original approved permit dated December 4. 1998. are in effect for this revision. Chairman BY ORDER OF THE COMMISSION dlffEnclosures CC~ Department of Fish & Game. Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA ~¢L AND GAS CONSERVATION COk .... ,ISSION PERMIT TO DRILL 20 AAC 25.005 REVISED.. 07/19/99 la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI I~Service [] Development Gas []Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan RKB = 65.43' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028258 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 1633' SNL, 1050' EWL, SEC. 35, T12N, R12E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 1632' NSL, 1567' WEL, SEC. 27, T12N, R12E, UM S-24Ai At total depth 9. Approximate spud date Amount $200,000.00 2486' NSL, 4319' WEL, SEC. 27, T12N, R12E, UM 08/01/99 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028256, 2794'I No Close Approach 2560 13041' MD / 8911' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 2700' MD Maximum Hole Angle 93.9° Maximum surface 2375 psig, At total depth (TVD) 8750' / 3250 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 9-7/8" 7" 26# L-80 BTC-M 10010' 35' 35' 10045' 8670' 815 sx Class 'G' 6-1/8" 4-1/2" 12.6# L-80 IBT-M 3146' 9895' 8542' 13041' 8910' 335 sx Class 'G' ..... lqq~ 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary TOC P&A Plug at 9016' (07/99) &!asKa 0il & 6as 00ne, 0O~ Total depth: measured 10428 feet Plugs (measured) Anchorage true vertical 9311 feet Effective depth: measured 10017 feet Junk (measured) Perf assembly fish at 10183' (05/92); Fill on top of fish at 10112' (01/91) true vertical 8961 feet Casing Length Size Cemented MD TVD Structural Conductor 110' 20" 139' 139' Surface 2639' 13-3/8" 2580 cu ft Arcticset II & III 2668' 2668' Intermediate 9804' 9-5/8" 2040 cuft Class 'G' 9843' 8816' Production Liner 838' 7" 258 cu ft Class 'G' 9590' - 10428' 8610' - 9311' Perforation depth: measured Squeezed: 9834'-10132' 0RIG!~,~IAL. true vertical Subsea 8873' - 8992' (three intervals) 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Bill Isaacson, 564-5521 James Smith, 564-5026 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the/f~oregoing is true and correct to the best of my knowledge Signed /~~~ Dan Stone Title Senior Drilling Engineer Date 7- ~'=1- '~ ~' u.- ¢/¢'"'~mmission Use Only PermitNumber I APINumber I ApprovalpCe I Seecoverletter 98-245 50-029-22044-01 J~, -" '~'-- for other requirements Conditions of Approval: Samples Required []Yes [] No Mud Log Required []Yes l~"No Hydrogen Sulfide Measures ~i]Yes [] No Directional Survey Required ,~]Yes [] No Required Working Pressure for DOPE [] 2K; []3K; J~4K; [] 5K; [] 10K; [] 15K Other: ORIGINAL SIGNED-BY by order of Approved By Robert N. Christenson Commissioner the commission Date ~' C;~ 7 Form 10-401 Rev. 12-01-85 Submit In Triplicate S-24Ai Permit to Drill I Well Name: I S-24Ai Sidetrack Plan Summary I Type of Redrill (producer or injector)' I Injector Surface Location' Target Location: Bottom Hole Location: 3646' FSL 4229' FEL 1632' FSL 1567' FEL 2486' FSL 4319' FEL S35 T12N R12E S27 T12N R12E S27 T12N R12E Umiat Umiat Umiat I AFENumber: 14P1200 I I Estimated Start Date: 1 8/01/99 MD: 113,041' I I TVD: I 8911' I I Rig: I Nabors9ES I Operating days to complete: I BF/MSL: 1 37.05' I I RKB: 1 65.43' I Well Design (conventional, slimhole, etc.)' I Extended Horizontal Sidetrack I Objective: I Development injection targeting upper Zone 4 sands. Mud Program: Intermediate Mud Pr°perties: LSND I 9-7/8" h°le iecti°n I II I Density (PPg)l Funnel visI Yield Point 10 sec gel 10 min gel 9.6- 10.8 45-50 18-29 4-8 8-12 pH 9-10 I Fluid Loss 6-9 Production Mud Properties' Quickdril-n 1 6-1/8" hole section Density (ppg) I Funnel visI LSRVI LSRYP 8.3 - 8.5 38-50 <12,000 cP 10-20 pH 8.5-9.0 I Directional: IKOP: I 2700' MD Maximum Hole Angle: Close Approach Well' 93.9° @ 11,778' (8996' TVD) None Logging Program: Intermediate Production Hole(Horizontal) Drilling: Open Hole: Cased Hole: Drilling' Open Hole: MWD / G R GR / Resistivity / Neutron Density / Sonic / RFT (across Kuparuk Interval) CBT MWD / GR / Resistivity None S-24Ai Permit to Drill Formation Markers: Formation Tops MD TVDss Comments Base Permafrost 1880' Not Penetrated 13-3/8' Casing Shoe 2669' 2669' SV3 / T5 2700' 2700' Kick-off with-in SV3 SV1 / T3 3310' 3200' UG4 / K15-Cl 3763' 3550' UG1 / UgS 4734' 4300' Est. pore pressure 2125 psi (9.5 ppg EMW) WS1 / West Sak 5627' 4990' Est. pore pressure 2465 psi (9.5 ppg EMW) CM3 / K-12 5899' 5200' CM2 / K-10 CM-1 / K5 K2/Top HRZ Kuparuk 7701' 6590' Est. pore pressure 3255 psi (9.5 ppg EMW) LCU 7771' 6660' Miluveach 7900' 6770' Top Kingak (JG) 8753' 7550' Sag River 10,045' 8600' Shublik 10,092' 8645' Top Sadlerochit/Z4B 10,231' 8750' Est. pore pressure 3100 psi (6.8 ppg EMW) Top Z4A 11,538' 8900' Maximum TVDss 11,741' 8932' HOT 8990' Not Penetrated OOWC 9025' Not Penetrated Casing/Tubing Program: Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbg O.D. MDITVD MDITVD 9-7/8" 7" 26# L-80 BTC-M 10,010' ~35'/35' 10,045'/8670' 6-1/8" 4-1/2" 12.6# L-80 IBT-M 3146' 9895'/8542' 13,041'/8910' Tubing 4-1/2" 12.6# L-80 NSCT 9862' ~33'/33' 9895'/8542' NOTE: The 4 1/2" orocluction liner will be a Bonzai style completion with the solid cemented section covering all but the end +~-500' of hole section, which will be uncemented slotted liner. As a contingency, the liner will be a solid cemented liner all the way to TD Cement Calculations: Casing Size 7" Intermediat,e ! 15ased on 2045 of open hole with 100% excess. Basis' Lead: Lead TOC: At ~7200' MD (6271' TVD), ~500' MD above the top Kuparuk reservoir. Tail: Based on 80' shoe track volume and 800' of open hole with 38% excess. Tail TOC: At ~9245' MD (7987' TVD). Total C'ement Volume: Lead I 193 bbl / 1084 f¢ / 328 sks of BJ Services Premium 'G' at 1 11.0 ppg and 3.31 cf/sk. ITai I 55 bbl/309 ft3 / 287 sks of BJ Services Premium 'G' at 1 15.8 ppg and 1.14 cf/sk. Liner Size 14 W' Production I Basis: Tail: Based on 2495' of open hole over solid cemented portion of liner with 50% excess, 150' of 7" x 4.5" liner lap and 200' of 7" x 4" drill pipe annulus volume. Tail TOC: At top of liner -9,895' MD (8542' TVD). Total Cement Volume' I Tail I 71 bbl/399 f¢ / 335 sks of BJ Services Premium 'G' at I 1 15.8 ppg and 1.19' cf/sk. S-24Ai Permit to Drill Well Control: Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Intermediate Section- - Maximum anticipated BHP: 3300 psi @ 6600' TVDss - Kuparuk · Maximum surface pressure: 2640 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/fi) Production Interval- . Maximum anticipated BHP: 3250 psi @ 8750' TVDss - Zone 4 · Maximum surface pressure: 2375 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft · Planned completion fluid: 8.5 ppg Seawater/6.8 ppg Diesel Drilling Hazards/Contingencies: HYDROGEN SULFIDE - H2S · S Pad is not designated as an H2S drill site, however Standard Operating Procedures for H2S precautions should be followed at all times. The highest level of H2S recently measured on S Pad has been 60 ppi from S-37 in December of 98. DRILLING CLOSE APPROACH: · All wells pass close approach guidelines. INTERMEDIATE SECTION: · Gas cut mud has been observed in the Ugnu (4300' TVDss), West Sak (4990' TVDss), and Kuparuk (6600' TVDss) sands. This will be controlled with appropriate mud weights. · The S-24Ai well path will drill full sections of both the HRZ and Kingak shale. · Tight hole conditions and stuck pipe have been encountered in the Kingak shale interval. Increased mud weights and the addition of shale stabilizers may be required. · The kick tolerance for the 9-7/8" open hole section would be 19 bbls assuming an influx from the Kuparuk interval at -,,7700' MD. This is a worst case scenario based on an 10.0 ppg pore pressure gradient, a fracture gradient of 12.0 ppg at the surface casing shoe, and 10.4 ppg mud in the hole. PRODUCTION SECTION: · Differential sticking will be a problem if loss circulation is occurring or if the drill string is left stationary for an extended period or time. · The kick tolerance for the 7" shoe would be an infinite influx (annular volume) assuming an influx at section TD of 13,040'. This is a worst case scenario based on a 7.9 ppg pore pressure, a minimum fracture gradient of 10.0 ppg at the 7" casing shoe, and 8.4 ppg mud in the hole. S-24Ai Permit to Drill , Disposal: No annular injection in this well. Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC- 2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the North Slope Borough. SUMMARY SIDETRACK PROCEDURES Pre-Rig Work: The foflowing pre-rig work has already been completed (under approved Sundry #398-313). The work was completed in early December of 1998, in preparation for this sidetrack, which was originally planed for a mid December spud. 1. CTU performed a cement P&A across the existing perorations using 40 bbls of 15.8 ppg class 'G' cement, of which 10 bbls contained 20 ppb aggregate. Cement was laid in across the perorations and 12 bbls were squeezed behind pipe, using the hesitation method. (11-29-98) 2. Slickline tagged top of cement at 9016' MD and pressure tested the cement to 3000 psi for 30 minutes, with a 150 psi loss. (11-30-98) 3. E-line cut the 4 1/2" L-80 tubing at 4512' MD (22' down into a 40' joint). (11-30-98) 4. The well was displaced to clean seawater through the tubing cut and diesel was U-tubed in to freeze protect to ~2000' MD. (12-1-98) 5. The 9-5/8" casing was tested against the cement plug to 3000 psi for 30 minutes, loosing 50 psi over the 30 minute period. (12-2-98) 6. The McEvoy 9-5/8" mandrel packoff was tested to 5000 psi and bled down to 3500 psi in 30 minutes. Nothing further was done, and plans were made to change out the pack-off as part of the sidetrack. The tubing hanger seals were successfully tested to 5000 psi for 15 minutes. (12-2-98) The foflowing pre-rig work will need to be completed prior to rig arrival 1. Bleed tubing and annuli pressures to zero. Set a BPV in the tubing hanger and test from below to 1000 psi. Secure well. 2. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation cost on the handover form. Rig 1. 2. 3. 4. 5. Operations: MIRU Nabors 9ES Pull BPV. Circulate out freeze protection and displace well to seawater. Set TVVC. Nipple down tree. Nipple up and test BOPE. Pull TVVC. Pull and lay down 4-1/2" tubing from E-line cut at 4512'. MU 9-5/8" BP on 4" DP. RIH with BP and set at ~3030' MD. Release from BP and displace well to 9.6 ppg milling fluid. Spot 18.0 ppg pill from top of BP up to planned cut depth of 2830' MD. POOH. 6. MU Baker multi-string casing cutter to cut 9-5/8" casing. RIH and cut casing at 2830' MD. POOH. 7. Spear 9-5/8" casing and POOH with same. 8. RIH with cement stinger and spot cement kick-off plug from top of 9-5/8" casing stub, up into the 13- 3/8" casing shoe. Perform hesitation squeeze and POOH. 9. MU 9-7/8" drilling assembly and RIH to top of cement. Clean out cement to ~25' below 13-3/8" shoe. Kick-off and drill the 9-7/8" intermediate section to logging point, just through the Kuparuk formation. 10. POOH and RU E-line. Log the Kuparuk formation with Platform Express / Sonic / RFT Logs. 11. RIH with 9-7/8" drilling assembly and drill ahead to Top Sag @ +10,045' MD (8670' TVD). POOH. 12. Run and cement the 7", 26# intermediate casing string, covering all shallow hydrocarbon bearing zones. Hang 7" casing on slips at surface. 13. Make up and RIH with a 6" directional assembly to the landing collar. 14. Test the 7"4~-~6~ ~,nd 0-$-~" casing from the landing collar to surface to 3000 psi for 30 minutes. S-24Ai Permit to Drill 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. Drill the 6" production section building at 15.7°/100' to horizontal, targeting the Zone 4 sands. Drill ahead to an estimated total depth of 13,041' MD (8911' TVD). Run and cement a 4-1/2", 12.6# Bonzai production liner (solid liner cemented above ECP with slotted liner below) throughout the 6" wellbore. Test the 4-1/2", 7", and 9-5/8" casing from the 4-1/2" landing collar to surface to 4000 psi for 30 minutes. Displace well to clean seawater above liner top. POOH laying down DP. Run a USIT / CBT on e-line to evaluate cement behind the 7" casing for AOGCC injection well compliance. Log -,-1000' of 7" casing above the 4-1/2" liner top. Run 4-1/2", 12.6# L-80 NSCT completion tying into the 4-1/2" liner top. Freeze protect the well to ~2200'. Set packer and test the tubing to 4000 psi for 30 minutes. Test the annulus to 4000 psi for 30 minutes with 2000 psi on the tubing. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Secure the well and rig down / move off. The Bonzai liner cementing plugs will be drilled out with coiled tubing post rig release. Estimated Pre-rig Start Date: Estimated Spud Date: 07/21/99 08/01/99 William Isaacson Operations Drilling Engineer 564-5521 TREE: 4" CIW WELLHEAD: McEVOY ACTUATOR: BAKER S-24i Current Condition KB. ELEV: 66.25' BF. ELEV: 37.05' 4-1/2" HES X NIPPLE 3.813" ID NO CONTROL LINES 2195' 13-3/8", 68#/ft, L-80 BTRS I 2669' 4-1/2", 12.6#/ft, L-80, TUBING TUBING ID: 3.958" CAPACITY: 0.0152 BBI_/FT Tubing Jet Cut at 4512' No Gas Lift Mandrels Top of Cement Tagged at 9016' pERFORATION SUMMARY REF LOG: ATLAS- BHCA- 5-7-90 SIZE SPF INTERVAL OPEN/SQZ'D 3 3/8" 4 9834' - 9884' ALL 5" 4 9991 - 10,040' SQUEEZED S" 4 10,050- 10,086' DURING PRE- S'' 4 10,099 - 10,132' RIG P&A. PBTD 110,386'1 7", 26 #/ft, L-80, BUTT I 10,428' I 4-1/2" HES X NIPPLE 3.813" ID 9-5/8" TIW PACKER (H BBP-T)(3.93" ID) 4-1/2" HES X NIPPLE 3.813" ID 9508' 9519' 9619' 9629' 9641' 9641 ' 9945' 9953' 9957' 4-1/2" HES X NIPPLE 3.813" ID 4-1/2" WLEG 4-'1/2" ELMD 4-1/2" GUN RELEASE ( 5.218" OD) (3.94" ID) 9959' 9961' NOTE: 3" FLOWLINE IN SKID Portions of this wells flowline are 3" and subject to erosion. The GC should be notified of any well operations which could increase the flow or erosion rates. FISH: Tubing conveyed perforating assembly left in well 5-24-90. Length is 171.75'. Top at 10,1 93' WLM. DATE 7-7-99 REV. BY WSI COMMENTS Current Well Status Followinq Sidetrack Pre-Riq Work PRUDHOE BAY UNIT WELL: ~-24 (45-27-12-121 APl NO: 50-029-22044 ~I::C 3~- TN 12 N- 12 RGE BP EXPLORATION TREE: 4-1/16" - 5M ClW L-80 WELLHEAD: 13 5~8" - 5M McEvoy SSH 13-3/8", 68 #/ft, L80, BTC I 2669' ~ S-24Ai Proposed Completion 4-1/2" 'X' Landing Nipple with 3.813" seal bore. 12200'1 Cellar Elevation: 35.43' Base Flange: 37.05' Nabors 9ES RKB = 65.43' Cut and Pull 9-5/8" Casing Top of casing stub at +~-2835' MD Bridge Plug set at +/-3030' MD 4-1/2" 12.6# L-80, NSCT Tubing 4-1/2" 'X' Landing Nipple with 3.813" seal bore. 7" x 4-1/2" Baker 'S-3' Production Packer 4-1/2" 'X' Landing Nipple with 3.813" seal bore. 4-1/2" 'XN' Landing Nipple with 3.813" seal bore and 3.725" No-Go ID. 4-1/2" WireLine Entry Guide spaced-out into 4-1/2" liner tie-back sleeve. +/-9895' J BAKER 5" x 7" Tie Back Sleeve ZXP Liner Top Packer 'HMC' Hydraulic Liner Hanger 9-5/8", 47 #/ft, L80, NSCC +/-10,045' J 7", 26 #/ft, L-80, BTC-Mod I +/-12~540' I 4-1/2" 12.6 #/ft, L-80, BTC-Mod w/Baker CTC ECP 4-1/2" 12.6 #/ft, L-80, BTC-Mod Slotted Liner to I +/-13,040' I 7", 26 #/ft, L80, BUTT Date Rev By Comments PRUDHOE BAY UNIT 7/17/99 WSI Proposed Completion WELL: S-24Ai APl NO: 50-029-22044-01 Shared Services Drilling Anadril 1 Schlumberger Alaska District 39~0 Arctic Blvd. Anc hora§e, AK g9503 (907) 273-1700 Fa~x 561-8557 DrRBCTIONAL WELL pTAN for S~L~RED SERVrCEs DRILLING ~el] ......... : S-24A (PllA) Fie2d ........ : Prudhoe Bay Computation..: Minimum Curvature · UniTs FEET Surface Lat,.: 70.35360312 N Surface Long,: 149.03194696 W Legal Surface ...... : 3646 FSL 4229 Tie-in survey: 3655 FSL 4~20 guparuk TGT.,: 647 FSL 860 Sag Tgt ...... : 1632 F$L 1567 Sad Tgt ...... : L771 F$L 1754 Faul~ Tc3t .... : 2004 FSL 2480 Target Point.: 21¢7 FSL 3~68 B~L .......... : 2486 FSL ~319 Description F~L S35 T12N S35 T12N $2? T12N F~L S27 TI2N FEL S27 T12m FEL S27 T12N FEL $27 T~2N LOCATIONS - ALASKA Zone: K-Coord R12E ~M RI2E UM R12E UM Rt2E UM RI2E UM RL2E UM RL2EUM R12E UM 619213 O0 6L9222 35 617263 O0 6L65~0 O0 61655G O0 6~5620 O0 615~30 O0 613774.~0 4 Y-Coord 5979555~00 5979863.94 5982105.00 5983079.00 5983215.00 5983437.00 5983570,00 5983890,00 Prepared ..... : 15 JuL ]999 vert sect az.: 307.37 KB elevation.: 65.43 ft Magnetic Dcln: +27,4SV (E} Scale Factor.: ~,99991614 Convergence..: +~.91170814 FOR STUDY ONLY PROPOSED WELL PROFILE STATION IDEI~TIFICATIO~ ___ TIE-iN SURVEY K0P CURVE 6/100 MEASIERED INCI/N DIRECTION VERTICAL-DEPTHS DEPT7{ ~/gGLE AZIMUT~ TVD SUB-SEA 269?.28 L.53 3,42 2697.12 2631,69 2700.00 1.53 3,~S 2699.84 2634,4~ 2800.00 7,15 326,98 2799.53 273~.5Q 2900,90 ~3.11 322,93 2897.92 2832.49 3000,00 19.10 321.39 2993.96 2928.53 SECT/ON DEPAR~ -2.25 -2.~7 2L.25 48.07 COORDINATES-FROM ALASKA Zone 4 WELLHEAD X Y 8.79 15.42 29, '71 9.58 E 619229.35 5979863,94 9.50 E 619222.36 5979864.01 6.20 E 619218.95 5979870.52 4.05 W 619208.48 5979884.63 21.11 W 619191.0~ 59799~6.21 3100.0~ 25.09 3200.00 31,09 330~.00 37.08 320.56 3086 ,57 3021.1~ 320.04 3174 ,75 31~9,32 319.$7 3257.53 3192 ,10 84.~2 130,$0 ~85,~9 80.75 116.9~ 159.76 44.81 9; 74.89 [~ 619166,91 5979935.02 619136.37 5979970.73 619099.47 5980012,96 TOOL DL/ FACE 4R <TIE 331 8.¢5 91 6.00 51 ~ .00 31 31 6,00 21 6.00 21 6.00 (Anadrill {c)99 S24A@LL 3.2C 9:08 AR @) S-24A (PllA) 15 Jul 1999 Page 2 PROPOSED WSLL PROFILE STATIO~ IDENT[ F[CAT ION END 6/100 CURVE CURVE 5/[00 END 5/100 CURVE MEASURED INCLN DB PI~{ ANGLE DIRECTION ¥ ERT[CAL-D~.PTRS AZ 2MtrfR TVD SUB-SEA 3338.98 39.42 319.56 3288.14 3222.71 7527.40 39.42 319.56 6523.72 6458.29 7600.00 35.95 321.32 6581.17 6515.74 7700.00 31.23 324.29 6664.45 £599.02 7701,15 31.18 324.33 6665.43 6600.00 KUPARUK TGT TOP KINGAK PROP 7" CSG PT TOP SAG RIVER CURVE 7701,15 31.I8 324.33 6665.43 6600.00 8753.06 31.18 324.33 7565.43 7500.00 10044.55 31.18 324.33 8678.43 8605.00 10044.58 31,L8 324.33 8670.43 8605.00 100~4.58 31,~8 324,33 8687.54 8622,11 TARGET TOP SADLEROCHIT SECT]ON DE PART END SS.~/S00 CURVE 14/100 TARGET FAULT L 208.78 2808.57 2851.80 2905.13 2905.70 ~o 14/loo CURVE O3RVB 12/~00 TARGET POIt~T END 12/100 CURV~ 2905.70 3426.58 4~66.11 4066,[1 4076,01 TO lOtOO.O0 35.54 318.03 8717.13 8651,70 i094,91 10200.00 49,01 305,92 879L.fl~ 872~.64 4~61.62 102J0.89 53.37 303,20 8810.43 89%5,00 4185,65 ~8230.89 53.37 303.20 8810.43 87t5,00 4185,65 ~8309.00 63.31 298.07 8846.$7 8781.24 4243,95 10i00.00 97.95 292.02 8879.77 BB[4.34 4335.77 10481.65 89.99 287.59 8888,34 88~2.91 4413.05 11125.42 89.99 2~7.59 8888,43 8825.00 5018.80 ~1125,48 90.00 287.59 8888.~3 $823.00 5018.85 11200,00 80.16 284.1I 8894.82 8829.39 5087.83 112X?,16 77,90 283,29 8898.08 8632.65 5103.26 11640,40 77.90 283,29 8986.82 8921,39 5481.06 11700.00 85.05 283,29 8995.65 8930,22 5534.83 11741.25 90.00 283,29 8997.43 8932,0~ 5572.45 11777.52 93.89 285.23 8~96.20 8930.77 5605,77 13040,44 93.89 285.23 8910,43 B845.00 6?72.86 COORD1NATES-FRCaM AGASK3% Zone 4 WELLREAD X Y %78.13 H 126.65 W 619083.55 5980031.08 2202.2~ N ]851.98 W 617326.31 5982027.34 2236.46 H 1880,27 W 617297.55 5982061.07 22~0.45 N 1913.77 W 617263.35 5982104.52 2280.94 N 1924,11 W 617263.00 5982105.00 TOOL DL/ FAC~ 100 =~= ===~ HS 6.00 163R 162R 5,00 160R 5.00 HS 5,O0 2280.94 N 1914,11 2723.29 N 2231.68 3266.40 N 2625.58 3266,40 N 2621.58 3274,81 N 2627.62 617263.00 5982105.00 HS 5,00 616935.46 5982542.21 MS 0,00 636540,00 5983099.00 aS 0.00 616540,00 5983079.00 HS 616533,83 598308~.31 4iL 0.00 3289,92 N 2639.86 3333.95 N 2690.18 3347.58 N 2710.00 3~47.58 N 2Vi0.00 3377.38 N 2760.60 616521,35 5983102.23 616490.35 5983145,44 616450,31 ~983158,76 g~6450.31 5983158,?6 616399.24 5983187.75 36L 15.90 271 15.70 251 15.70 251 15.70 221 15.70 3416.99 N 2845.89 W 616313.35 5983225,99 201 1S.V0 3444.~1 N 2922.13 W 61~236.68 5983252,19 HS 15.70 3639.01 N 3535 79 W 615620.05 5983436,98 KS 0,O0 3639.03 N 3535 85 W 615620.00 5983437.00 1615 14,00 3659,30 N 3607 16 W 615548.38 5983456.13 160G 14,00 3663,29 N 3623 53 W 655531.95 5983459.86 3758.40 N 4026 28 W 655127,77 5983548.55 3771,94 N 4063.61 W 615070,24 5983561.I7 3781.41 N 4123.71 W 615030,00 5983570.00 3790.34 N 4158.83 ~ 614994,74 5983578.37 14,00 0,00 12,00 26R 12.00 HS ~2.00 4121.39 N 5374.56 W 613774.00 5983890,~0 0.00 (Anadrill [c) 99 $24APll 3,2C 9:08 AM P) FOR STUDY ONLY SHARED SERVICES DRIELIN6 D ~ VERTICAL SECTION VIEW , ...................... --T ................................... Sect ion at: 307.37 TVD ScBle,' ~ inch = 1200 feet .... ,. ,~,,~%'I ~~ Dap Scale.' ~ inch = 1200 feet I ' ~ AnadrJl] Schlumberger I illm , ~ ~r~r ~en~f~c~n HD ~K8 SE~T~ ~L~ ~ ~] T~E-~ SURGE7 2Gg7 ~G~7 -~ ~.5~ ~'- I C) E~D ~/100 CUR~E ~3~g 3~88 ~ ~.q~  ................. D) ~URYE 5/~0~ 75~9 65~ ~8~g ~.~ ~) ~D 1~/~0~ ~VA~E ~7 8898 5~03 77,~  I O) T~RGET POINT 1t741 8997 5572 90.00 I P) END ~2/100 CURVE 11778 8998 5506 93.89 ~ O) TD 13040 8910 6773 93.89 i ' ~ ~ ~l -~ "~"'~' ' '¢" ~'~ .--- . .... - ~up~ ~~ [~ ~ ............................ gr -~- - ~ ..... -.' ; ~¢ 2¢t ~i~L ..... _ .......... ~ ............... z~,~ _~.. r~ ~P~ ~._ I I .... , i i .... I I I I .... , ........ I .. 0 600 J200 i800 2400 3000 3600 4200 4800 5400 6000 6500 7200 7800 Sect ion Bepactu__ce _ SHARED SERVICES Marker Identification MD A) TIE-IN SURVEY 2597 8i KOP CURVE 6/100 2700 C) END 6/100 CURVE 3339 D} CURVE 5/100 7527 E} ENO 5/100 CURVE 7701 F) KUPARUK TGT 7701 G] PROP 7" CS6 PT 10045 HI CURVE 15,7/100 10065 I) TARGET t0231 d} END 15.7/100 10482 K) CURVE ~4/100 11~25 L) TARGET FAULT ~ 11125 M) END 14/100 CURVE 11217 N) CURVE J2/100 11640 O} TARGET POINT 1174~ P) END ~2/~00 CURVE ~778 N/S E/W 178 N 127 2202 N ~852 W 2281 N 1914 W 2281 N 1914 H 3266 N 2622 3275 N 2628 3348 N 2710 3444 N 2928 3639 N 3535 3639 N 3536 3663 N 3624 3758 N 4026 3781N 4~24 3790 N 415g DRILLING S-24A (Pi A) PLAN VIEW CLOSURE ..... : 6773 feet at Azimuth 307.48 DECLINATION.: +27.487 (E) SCALE ....... : 1 1nub = ~000 feet DRAWN ....... : 15 Jul 1999 Anad/'i ll Schlumberger 6500 6000 5§00 5000 4500 4000 ~500 3000 2500 2000 ~500 )OOO 500 0 500 <- ~£5T ' EAST -> imm i iiii _ __ I ........................................................... " I' : I , ..... ' ~ ~~rl~:et Point (Point) i" ': '~'~.~~Jit Tot (Point> ~ _JSad Tgt [ i ................................ re.d .ry,.ce r ll ng WELL NAME S-24Ai DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET The attached work cannot commence without obtaining the.required signatures in I the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: DRILLING PERMIT r~ Permit Documentation Prepared: ODE: 1~-~'~' ~ ~ .... Date: DPermit Ap]~lication~ Reviewed: SDE/ES:~ {~ Date: Permit ~pplic~mnq~~ed: TA: ~/~'/.~ .~ ~~.~ Date:'~/Jq/?? 'only one category per cover sheet) SUNDRY NOTICE D Sundry Documentation Prepared: · ODE: Date: I--I Sundry Application Reviewed: SDE/ES' Date: D Sundry Application Submitted: TA: Date: NOTE: IF SUNDRY IS FOR PRE-RIG WORK, USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW PRE-RIG WORK Reason for Sundry (Check all that apply) Pre-Rig Memo Reviewed: SDE/ES: Date: Pre-Rig Memo Sent to Slope: ODE: Date: Pre-Rig Sundry Documentation Prepared: ODE: Date: Pre-Rig Sundry Application Reviewed: SDE/ES: Date: Pre-Rig Sundry Application Submitted: Abandon Alter Casing Suspend Repair Well Plugging Pull Tubing Variance Other(Explain): Change Approved Program Operation Shutdown Re-enter Suspended Well Time Extension Perforate Stimulate TA: Date: I APPROVAL TO PROCEED Approved AOGCC Permit/Sundry Received TA: Date: Approval to Commence Operations SDE/ES: Date: TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Dcccmber 4, 1998 Dan Stone Engineering Supcrvisor BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re; Prudhoe Bay Unit S-24Ai BP Exploration (Alaska), Inc. Permit No: 98-245 Sur. Loc. 1633'SNL, 1050'EWL, SEC. 35, T12N, RI2E, UM Btmhole Loc. 862'SNL. 3870'EWL. SEC. 27, T12N, R12E, UM Dear Mr. Stone: Enclosed is the approved application for permit to redrill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required bv lax,,' from other governmental agencies, and does not authorize conducting drilling operations until all other rcquired pcrmitting determinations are made. Thc blowout prevention equipmcnt (BOPE) must be tcstcd in accordance with 20 AAC 25.035; nd thc mcchanical integrity (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 AAC 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before operation, and of thc BOPE test performed before drilling below the surface casing shoe, must be given so that a rcprescntative of the Commission may witness thc tests. Notice may be given bv contacting thc Commission petroleum field inspector on the North Slope pager at 659-3607. ~Sinc //' Robert N. Christcnson, P.E. Commissioner BY ORDER OF THE COMMISSION dlf/Enclosure ccz Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA,. _~¢L AND GAS CONSERVATION cor~. ,ISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil []Re-Entry I--IDeepenI []Service I--I Development Gas r-i Single Zone I--I Multiple Zone 21' Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan RKB = 63.43' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519~6612 ADL028258 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 1633' SNL, 1050' EWL, SEC. 35, T12N, R12E, UM Prudhoe Bay Unit At top of productive interval "~. Well Number Number 2S100302630-277 3027' SNL, 2858' EWL, SEC. 27, T12N, R12E, UM S-24Ai Attotal depth 9. Approximate spud date Amount $200,000.00 862' SNL, 3870' EWL, SEC. 27, T12N, R12E, UM 12/04/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL028256, 862'I No Close Approach 2560 13858' MD / 8993' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 3800' MD Maximum Hole Angle 102° Maximum surface 2325 psig, At total depth C'VD) 8750' / 3200 psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 8-1/2" 7" 26# L-80 BTC-M 6817' 3650' 3625' 10467' 8668' 615 sx Class 'G' 6" ~-1/2" 12.6# L-80 IBT-M 3541' 10317' 8546' 13858' 8993 409 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. ('~0V Present well condition summary Total depth: measured 10428 feet Plugs (measured) AJEtsk:Et 0iJ & Oas Oorl$. Coriiflliss[ort true vertical 9311 feet Effective depth: measured 10017 feet Junk (measured) Perf assem s. ,~ 10183' (05/92); Fill on top of fish @ true vertical 8961 feet 10112' (01/91) Casing Length Size Cemented MD TVD Structural BKB Conductor 110' 20" 139' 139' Surface 2639' 13-3/8" 2580 c.f. Arcticset II & III 2668' 2668' Intermediate 9804' 9-5/8" 2040 c.f. Class 'G' 9843' 8816' Production Liner 838' 7" 258 c.f. Class 'G' 9590'-10428' 8610'-9311' Perforation depth: measured 9991'-10040',10050'-10086',10099'-10132' true vertical Subsea 8873'-8992' (three intervals) 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements C"ontact Engineer Name/Number: C. Michael Jackson, 564-5486 Prepared By Name/Number: Kathy Campoarnor, 564-5122 21.1Si.qnedhereby );~rtifyw..~,,.~that the_f~~~_~,~ is true and correct to the best of my knowledge }~-2~a~tone- Title Engineering Supervisor Date Commission Use Only Permit Number I APl Number Approy¢~l I~3_ to. I See cover letter ,~<~'- .2. ,~"..,,4"' 50- O ~ ~ ,-- 2.. 2__. 4:~ ~ (--/' -' ~/) 1 ~- "~ "']k~' for other requirements Conditions of Approval: Samples Required []Yes ~No Mud Log Required I--lYes [~No Hydrogen Sulfide Measures ]~lYes [] No Directional Survey Required J~Yes [] No Required Working Pressure for ROPE []2K; []3K; []4K; [~5K; [] 10K; [] 15K Other: ORIGINAL SIGNED'BY by order of ,/ Approved By Robert N. Chdstenson Commissioner the commission Date ]~,'-- Form 10-401 Rev. 12-01-85 Submit In Triplicate I Well Name: I S-24Ai Sidetrack Plan Summary I Type of Redrill (producer or injector): I Injector ISurface Location' Target Location: Bottom Hole Location: 1633 FNL 1050 FWL 3027 FNL 2858 FWL S35 T12N R12E Umiat S27 T12N R12E Umiat 862 FNL3870 FWL S27T12N R12E Umiat I AFENumber: 14P1200 I Estimated Start Date:112/04/98 I~D: 1~3,~5~' I I TVD: I ~99~' I I Rig: I Nabors7ES I Operating days to complete: 130 I BE/USE= 137.05'1 IEEe' 163.43' I Well Design (conventional, slimhole, etc.): I Extended Horizontal Sidetrack I Objective: I Development injection targeting Zone 4 sands. Mud Program: Intermediate ~ud Properties: LSND 8.5" hole section I Density (ppg) Funnel vis Yield Point 10 sec gel 10 min gel pH Fluid Loss 10.5-11.0 45-50 12-15 4-8 8-12 9-10 6-9 Production Mud Properties: Quickdril-n 16" hole section Density (ppg) Funnel vis LSRV LSR YP pH 8.6 - 8.8 45-65 >45,000 cP 10-20 8.5-9.0 Directional: KOP: I 3800' MD Maximum Hole Angle: Close Approach Well: 102° @ 12,760'(8949' TVD) None Logging Program: Intermediate Production Hole(Horizontal) Drilling: Open Hole: Cased Hole: Drilling' Open Hole: MWD / GR None USIT / CBT MWD / GR Platform Express + Sonic S-24Ai Permit to Drill Formation Markers: Formation Tops MD TVDss Comments Base Permafrost 1880' SV3 / T5 27OO' SV1 / T3 3200' UG4 / K15-C1 3800' 3550' Kickoff Point @ 3697' TVDss UG1 / UgS 4653' 4300' Est. pore pressure 2124 psi(9.5 ppg EMW) WS1 / West Sak 5597' 4990' Est. pore pressure 2465 psi(9.5 ppg EMW) CM3 / K12 5880' 5200' Kuparuk 7752' 6590' Est. pore pressure 3255 psi(9.5 ppg EMW) LCU 7847' 6660' Miluveach 7995' 6770' Top Kingak(H) 9046' 7550' TJF 9288' 7730' TJE 9625' 7980' TJ D 9813' 8120' TJC 10,150' 8370' TJB 10,366' 8530' TJA 10,406' 8560' Sag River 10,460' 8600' Shublik 10,521' 8645' Zone 4 10,712' 8750' Est. pore pressure 3200 psi(7.0 ppg EMW) Zone 3 8925' Not Penetrated Zone 2 9000' Not Penetrated HOT 8990' Not Penetrated OOWC 9025' Not Penetrated Casin! i/Tubing Proqram: Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbg O.D. MD/I'VD MD/TVD 8.5" 7" 26# L-80 BTC-M 6817' 3650'/3625' 10,467'/8668' 6" 4 1/2" 12.6# L-80 IBT-M 3541' 10,317'/8546' 13,858'/8993' Tubing 4 1/2" 12.6# L-80 NSCT 10,317' 0/0 10,317'/8546' Cement Calculations: Kickoff Plug I Cased / Open hole I Basis: Based on 200' of 9-5/8" casing volume above the section, 50' of 12-1/4" milled section and 100' of 9-5/8" casing below the section. TOC' At ~3600' md(3580' TVD, 3513' TVDss) T°talCementV°lume: I Tail 132bbl/180f¢/181sksofHalliburt°nPremium'G'at17ppgand0.99cf/sk. Liner Size 17" Intermediate I Basis: Lead' Based on 5667' open hole above tail with 100% excess and 150' liner lap. Lead TOC' At top of liner -3650' md(3625' TVD, 3559' TVDss). Tail' Based on 80' shoe track and 1000' of open hole with 30% excess. Tail TOC' At 9467' md(7925' TVD, 7862' TVDss). S-24Ai Permit to Drill Total Cement Volume: Lead 260 bbl/ 1459 ft~ / 450 sk of Halliburton Premium 'G' at 11.0 ppg and 3.24 cf/sk. Tail 34 bbl/190 ft~ / 165 sk of Halliburton Premium 'G' at 15.8 ppg and 1.15 cf/sk. Liner Size 14 1/2" Production I Basis: Tail: Based on 80' shoe track volume, 3398' of open hole with 50% excess, 150' of 7"x 4.5" liner lap and 200' of 7"x 4" drill pipe annulus volume. Tail TOC: At top of liner ~-10,317' md(8546' TVD, 8483' TVDss) Total Cement Volume: I Tail 86 bbl/482 ft~ / 409 sk of acid resistant Halliburton I Premium 'G' at 15.8 ppg and 1.18 cf/sk. Well Control: Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. · Maximum anticipated BHP: 3200 psi @ 8750' TVDss - Zone 4 · Maximum surface pressure: 2325 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/E) · Planned completion fluid: 8.5 ppg Seawater / 6.8 ppg Diesel Drilling Hazards/Contingencies DRILLING CLOSE APPROACH: · None INTERMEDIATE SECTION: · The Kingak shale is considered mechanically unstable over 50° inclination. The 6660' intermediate section will be drilled at inclinations up to 42° with mud asphalt products added for reduced shale reactivity. · Gas cut mud has been observed in the Ugnu(3800' TVDss) and Kuparuk(6500' TVDss) which will be controlled with appropriate mud weights. In addition, tight hole conditions have been encountered in the Kingak shales at 7400' TVDss. Mud weights as high as 11.0 ppg and the addition of shale stabilizers may be required. · The kick tolerance for the 8.5" open hole section would be 37 bbls assuming an influx at the 10,460' TD. This is a worst case scenario based on a 9.0 ppg pore pressure gradient and a fracture gradient of 11.0 ppg with a 11.0 ppg mud in the hole. S-24Ai Permit to Drill PRODUCTION SECTION: · Stuck pipe has not been recorded in the production interval but differential sticking will be a problem if loss circulation is occurring. · The kick tolerance for the 7" shoe would be an infinite influx(annular volume) assuming an influx at the 13,858' TD. This is a worst case scenario based on a 7.2 ppg pore pressure and a minimum fracture gradient of 10.0 ppg with a 8.5 ppg mud in the hole. Disposal No annular injection in this well. Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the North Slope Borough. SUMMARY SIDETRACK PROCEDURES Pre-Riq Work: , Perform a cement P&A of 15.8 ppg class 'G' cement with adequate cement volume to cover the 7" liner from PBTD at 10,385' to a minimum of 100' above the top perforation at 9834' plus squeeze 5 bbls to the perforations. Estimated cement volume needed is 30 barrels. A full bore P&A is recommended but is at the discretion of the Wells Group. There are no GLM's in the completion string. Note: Top of cement must be at a minimum of 9734' for AOGCC compliance. Top of cement may extend into the tubing as long as it does not interfere with the tubing cutting operations. 2. Rig up slickline, tag and document top of cement. 3. Cut the 4 1/2" L-80 tubing in the middle of a full joint of tubing at 4500'. This cut will not be fished and is at the discretion of the Wells Group as to chemical or jet cut. 4. Test the McEvoy 9-5/8" mandrel packoff and tubing hanger seals to 5000 psi for 30 minutes. 5. Test the casing against the cement plug to 3000 psi for 30 minutes. Freeze protect top 2200' MD with diesel. Ensure the cut is successful and communication exists between casing/tubing to avoid tubing collapse. 6. Bleed tubing and annuli pressures to zero. Set a BPV in the tubing hanger and test from below to 1000 psi. Secure well. 7. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation cost on the handover form. Ri_q Operations: 1. MIRU Nabors 7ES 2. Circulate out freeze protection. Set TWC. 3. Nipple down tree. Nipple up and test BOPE. 4. Pull 4-1/2" tubing. 5. Make up an 8.5" bridge plug on drill pipe and set at 4100'. S-24Ai Permit to Drill , 7. 8. 9. 10. 11. 12. 13. 14. 15. Weight test the bridge plug and pressure test the casing to 4000 psi for 30 minutes(injection well). Displace the well to milling fluid and spot a 18 ppg pill from the bridge plug to the milled section. RIH with 9-5/8" Baker section mill assembly and mill a 50' window from 3800' to 3850'. RIH with a mule shoe to 100' below the base of the section and spot a 17 ppg balanced cement plug from 100' below the section to 200' above the section. Kick-off drilling the 8-1/2" intermediate section to TSag @ +10,460' md(8663' TVD). Run and cement a 7", 26# intermediate liner with a minimum of 150' liner lap in the 9-5/8". Test the 7" and the 9-5/8" casing from the 7" landing collar to surface to 4000 psi for 30 minutes. Drill the 6" production section building to horizontal targeting the Zone 4 sands(8813' TVD) to an estimated depth of 1,858' md(8993' TVD). Run DPC 'Platform Express' + Sonic logs from horizontal to 7" shoe. Run and fully cement a 4-1/2", 12.6# production liner with a minimum of 150' liner lap in the 7". 1 6. Run a USlT / CBT on e-line as deep as possible logging the 4.5" and 7" cement bond for 1000' above the top of the 4.5" liner. 17. Test the 4-1/2", 7" and 9-5/8" casing from the 4-1/2" landing collar to surface to 4000 psi for 30 18. 19. 20. 21. 22. 23. minutes. The 4-1/2" production liner will be perforated with DPC 2.75" guns on a 400 psi under balance. Perforating intervals to be determined after reviewing logs. Run 4-1/2" NSCT L-80 completion tying into the 4-1/2" liner, Test the tubing to 4000 psi and annulus to 4000 psi for 30 minutes with 2500 psi on the tubing. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Freeze protect the well to -2200' and secure the well. Rig down and move off. Estimated Pre-rig Start Date: Estimated Spud Date: 11/27/98 12/04/98 C. Michael Jackson 564-5486 1 1/19/98 S-24Ai Permit to Drill Shared Services Drilling Well: S-24A Wp4 I DrillQuest' T,~v~ .~,~:PROPOSAL TARGET SUMMARY 'I'VDSS ~XFDRKB: Weilhoad O$1sols: G~:~al C.:~:~:~natos: S~ Tt ~25.~~.~ ~42.~ N, ~1.~ W 59~.~ N, 61~.~ E S~ ~.~ ~.~ ~.81N. ~76.61W ~.~ N, 61~75.~ E I ~ TM ~5.~ ~.~ ~13.~ N. ~.01 W ~15.~ N. 615~.~ E  T4 ~.~ ~.~ ~25 N, 3117.~ W ~.~ N, 61~15.~ E S-2~ T5 ~5,~ ~.~ ~.~ N, 2~5.~ W ~.~ N, 6~.~ E ~ T6 ~.~ ~.~ ~.~ N. 2467,~ W ~.~ N, 61~.~ E ............. UGI/UgS: 456J.45 TVD Proposal Data for S-24A Wp4 Vertical Origin:Well Horizontal Origin: Well Measurement~lnits: ft North Reference:True North Dogleg severity · Degrees I~r 100fi Vertical Section ~,zimuth: 336.039° Vertical Section Description:Well Vertical Section Origin: 0.00 N,0.00 E PRELIMINARY FOR PERMITtiNG ONLY Measured Incl. Azim. Vertical Northings Eastings VorticalDogleg Depth Depth Section Rate 3800.0027.53444.290 3761.19 217.07 N 125.16 E 147.53 4400.0058.089345.000 4212.50 584.04 N 158.03 E 469.53 8.000 4930.3442.074308.514 4558.43 920.82 N 44.49 W 859.54 6.000 10494.32 42.074308.514 8688.43 3242.54 N 2961.78 W4165.930.000 10751.28 72.081317.211 8826.68 3389.43 N 3115.93 W4362.7612.0O0 11090.72 72.081317.211 8931.12 3626.45 N 3335.33 W4668.450.000 11392.85 95.795345.000 8963.43 3885.81 N 3476.61 W4962.8412.000 11617.26 98.37512.018 8935.24 4106.29 N 3482.50 W5166.7112.000 11936.41 98.37512.018 8888.75 4415.11 N 3416.75 W5422.220.0gO 12147.28 81.80025.100 8888.43 4613.89 N 3350.01 W5576.7610.0O0 12208.39 75.71525.667 8900.34 4668.01 N 3324.33 W5615.7910.0O0 12402.24 75.71525.667 8948.17 4837.33 Iq '~ 3242.96 W5737.480.0O0 12682.30 98.00028.000 8963.43 5085.25 N 3117.48 W5913.078,000 12760.55 102.893 31.972 8949.24 5151.88 N 3079.06 W5958.358.000 12872.85 102.893 31.972 8924.18 5244.74 N 3021.10 W6019.670.0(~) 13216.14 82.39434.000 8908.43 5530.82 N 2835.35 W6205.666.000 13238.86 82.39435.375 8911.44 5549.33 N 2822,54 W6217.376.000 13858.37 82.39435.375 8993.43 6050.02 N 2467.05 W6530.550.000 SURFACE LOCATION Horizontal Coordinates: 28,00 ft Rig (EST) J RKB Elevation: 5979855.00 N, 619213.00 E63.43 ft35'43 ft WeIIRKB - AMSL j(CBE) JJ Coordinate System: NAD27 Alaska State Planes, Zone 4, US Foot PLOT DATE: 19-NOV-98 Created By: '~' Checked By: 0 ~ 90 450 1350 Scale: linch = 900ft I 2250 3150 Top IGngaklTJH/I'JG: ~615.45 FVD S.24A T2 ...... ';{,¢,.t';;'E~.~',:.,~,' ~ ............ ';.;;.;;:; ................................................................. S.24A TS $08,f.25 N, 3117.48 W $.24A T6 88~8.45 TVD 8993.43 TVD 4613.89 N, 33S0.01 W S.24A T5 6050.02 N, 2467.05 W 4050 4950 Vertical Section '~'~e~lit/TZ4: 8815.45 TVD oowc: 908& 45 TVD I 5850 6750 7650 Section Azimuth: 336.039° (True Nort O R I I,. I,. I N ~ Shared Services Drilling Well: S-24A Wp4 SURFACE LOCATION Horizonlal Coordinates: 5979855.00 N, 619213.00 E Rig (EST) RKB ElavaEon: 63.43 ft 28.00 fl35.43 ff Coordinate System: NAD27 Aie. ska State planes, Zone 4, US Foot PLOT DATE: 19-NOV-98 Created By: -- ~-- Checked By: PROPOSAL TARGET SUMMARY Target Name: 'I'VDSS TVDRKB: Wellhead Offsets:Global Coordinates: S-24A T1 8625,00 8688.43 3242.54 N, 2961.78 W 5983050.00 N, 616200.00 E S-24A T2 8900.00 8963.43 3885.81 N, 3476.61 W 5983685.00 N, 615675.00 E S-24A T3 ~' 8825.00 8888.43 4613.89 N, 3350.01 W 5984415,00 N, 615790.00 E S-24A T4 8900.00 8963.43 5085.25 N, 3117.48 W 59~4890.00 N, 616015.00 E S-24A T5 8845.00 8908.43 5530.82 N, 2835.35 W 5985340.00 N, 616290.00 E S-24A T6 8930,00 8993.43 6050.02 N, 2467.05 W 5985865.00 N, 616650.00 E -3600 -2700 -1800 -900 0 I I I I 9938S4 1/2' Liner 13.858.37 MD S.24A T5 - //y ..... ,. ....... _ ,° .... ' ...... FOR PE~I~ING ONL~ 89~.4J ~ ~3~.81 N, 476.61 W ~.~ 4~ 5400-- 4500-- 3600- 2700-- 180 900-- .-3600 -2700 -1800 -900 0 Scale: linch = 900ft Eastings J DrillQuest' 54OO 45O0 3600 2700 1800 900 Reference is True North Prudhoe Bay Unit Sperry-Sun Drilling Services Proposal Report for S-24A Wp4 Measured Sub-Sea Vedical Local Coordinates Global Coordinates Dogleg Ve~ical Depth Incl. Azim. Depth Depth Nothings Eastings Nothings Eastings Rate Section Comment (fi) (fi) (fi) (fi) (fi) (fi) (fi) (~100ff) (fi) 3800.00 27.534 44.290 3697.76 3761.19 217.07 N 125.16 E 5980074.03N 619334.69E 147.53 3900.00 30.005 28.428 3785.54 3848.97 255.67 N 153.25E 5980113.07N 619362.16E 8.000 171.40 4000.00 34,068 15.393 3870.39 3933.82 304.74 N 172.62 E 5980162.45 N 619380.74 E 8.000 208.37 4100.00 39.228 5.119 3950.67 4014.10 363.33 N 182.89 E 5980221.20 N 619390.08 E 8.000 257.75 4200.00 45.104 357.011 4024.82 4088.25 430.31 N 183.86 E 5980288.18 N 619389.99 E 8,000 318.55 4300.00 51.444 350.462 4091.38 4154.81 504.36 N 175.52 E 5980362.09 N 619380.48 E 8.000 389~61 4400.00 58.089 345,000 4149.07 4212.50 584.04 N 158.03 E 5980441.48 N 619361.72 E 8.000 469.53 4500.00 54.281 339.417 4204.74 4268.17 663.12 N 132.75 E 5980520.15 N 619335.18 E 6,000 552.06 4600.00 50.756 333,295 4265.61 4329.04 735.78 N 101.05 E 5980592.29 N 619302.33 E 6.000 631.33 4653.36 49.014 329.781 4300.00 4363.43 771.65 N 81.62 E 5980627.85 N 619282.33 E 6.000 672.00 UG1/UgS 4700.00 47.583 326.560 4331.03 4394.46 801.23 N 63.27 E 5980657.14 N 619263.51 E 6.000 706.49 4800.00 44.845 319.159 4400.27 4463.70 858.76 N 19.83 E 5980713.97 N 619219.16 E 6.000 776.70 4900.00 42.630 311.088 4472.58 4536.01 907.74 N 28.79W 5980762.16 N 619169.77 E 6.000 841.20 4930.34 42.074 308.514 4495.00 4558.43 920.82 N 44.49W 5980775.00 N 619153.86 E 6,000 859.54 5000.00 42.074 308.514 4546.71 4610.14 949.89 N 81.02W .5980803.48 N 619116.88 E 0.000 900.93 5100.00 42.074 308.514 4620.93 4684.36 991.62 N 133.45W 5980844.37 N 619063.79 E 0.000 960.36 5200.00 42.074 308.514 4695,16 4758.59 1033.34 N 185.88W 5980885.26 N 619010.70 E 0.000 1019,78 5300.00 42,074 308,514 4769.39 4832.82 1075.07 N 238.31W 5980926.14 N 618957.61 E 0.000 1079.21 5400.00 42,074 308.514 4843.62 4907.05 1116.80 N 290.74W 5980967.03 N 618904.52 E 0.000 1138.63 5500.00 42,074 308.514 4917.84 4981.27 1158.53 N 343.17W 5981007.92 N 618851.43 E 0.000 1198.06 5597.21 42.074 308.514 4990,00 5053.43 1199.09 N 394.14W 5981047.67 N 618799.83 E 0.000 1255.82 WS1/West Sak 5600.00 42.074 308.514 4992.07 5055.50 1200.25 N 395.61W 5981048.81 N 618798.35 E 0.000 1257.48 5700.00 42,074 308.514 5066.30 5129.73 1241.98 N 448.04W 5981089.70 N 618745.26 E 0.000 1316.91 5800.00 42.074 308.514 5140,53 5203.96 1283.71N 500.47W 5981130.58 N 618692.17 E 0,000 1376.33 5880.12 42.074 308.514 5200.00 5263.43 1317,14 N 542.48W 5981163.34 N 618649.63 E 0.000 1423.94 CM3/K-12 Alaska State Plane Zone 4 PBU_WOA S Pad Continued... 18 November, 1998- 15:04 - 1 - DrillQuest Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (~) (~) (~) 5900.00 42.074 308.514 5214.75 5278.18 6000.00 42.074 308.514 5288.98 5352.41 6100.00 42.074 308.514 5363.21 5426.64 6200.00 42.074 308.514 5437.44 5500.87 6300.00 42.074 308.514 5511.66 5575.09 6400.00 42.074 308.514 5585.89 5649.32 6500.00 42.074 308.514 5660.12 5723.55 6600.00 42.074 308.514 5734.35 5797.78 6700.00 42.074 308.514 5808.57 5872.00 6800.00 42.074 308.514 5882.80 5946.23 6900.00 42.074 308.514 5957.03 6020.46 7000.00 42.074 308.514 6031.26 6094.69 7100.00 42.074 308.514 6105.48 6168.91 7200.00 42.074 308.514 6179.71 6243.14 7300.00 42.074 308.514 6253.94 6317.37 7400.00 42.074 308.514 6328.17 6391.60 7500.00 42.074 308.514 6402.39 6465.82 7600.00 42.074 308.514 6476.62 6540.05 7700.00 42.074 308.514 6550.85 6614.28 7752.75 42.074 308.514 6590.00 6653.43 7800.00 42.074 308.514 6625.08 6688.51 7847.05 42.074 308.514 6660.00 6723.43 7900.00 42.074 308.514 6699.30 6762.73 7995.24 42.074 308.514 6770.00 6833.43 8000.00 42.074 308.514 6773.53 6836.96 8100.00 42.074 308.514 6847.76 6911.19 8200.00 42.074 308.514 6921.99 6985.42 8300.00 42.074 308.514 6996.21 7059.64 8400.00 42.074 308.514 7070.44 7133.87 8500.00 42.074 308.514 7144.67 7208.10 Sperry-Sun Drilling Services Proposal Report for S-24A Wp4 r'-r'.~,~T. ?'~ Local Coordinates Global Coordinates Nodhings Eastings Northings Eastings (~) (~) (~) (~) 1325.44N 552.90W 5981171.47 N 618639.08 E 1367.16 N 605.33W 5981212.36 N 618585.99 E 1408.89 N 657.77W 5981253.25 N 618532.90 E 1450.62 N 710.20W 5981294.14 N 618479.81E 1492.35 N 762.63W 5981335.02 N 618426.72 E 1534.08 N 815.06W 5981375.91N 618373.63 E 1575.80 N 867.49W 5981416.80 N 618320.54 E 1617.53 N 919.92W 5981457.69 N 618267.46 E 1659.26 N 972.36W 5981498.58 N 618214.37 E 1700.99 N 1024.79W 5981539.46 N 618161.28 E 1742.71N 1077.22W 5981580.35 N 618108.19 E 1784.44 N 1129.65W 5981621.24 N 618055.10 E 1826.17 N 1182.08W 5981662.13 N 618002.01 E 1867.90 N 1234.51W 5981703.02 N 617948.92 E 1909.62 N 1286.95W 5981743.90 N 617895.83 E 1951.35 N 1339.38W 5981784.79 N 617842.74 E 1993.08 N 1391.81W 5981825.68 N 617789.65 E 2034.81N 1444.24W 5981866.57 N 617736.56 E 2076.53 N 1496.67W 5981907.46 N 617683.48 E 2098.54 N 1524.33W 5981929.02 N 617655.47 E 2118.26 N 1549.10W 5981948.35 N 617630.39 E 2137.90 N 1573.77W 5981967.58 N 617605.41 E 2159.99 N 1601.54W 5981989.23 N 617577.30 E 2199.73 N 1651.47W 5982028.18 N 617526.73 E 2201.72 N 1653.97W 5982030.12 N 617524.21 E 2243.45 N 1706.40W 5982071.01 N 617471.12 E 2285.17 N 1758.83W 5982111.90 N 617418.03 E 2326.90 N 1811.26W 5982152.79 N 617364.94 E 2368.63 N 1863.69W 5982193.67 N 617311.85 E 2410,36 N 1916.13W 5982234.56 N 617258.76 E Dogleg Vertical Rate Section (o/~ 00ft) (ft) 0.000 1435.76 0.000 1495.18 0.000 1554.61 0.000 1614.03 0.000 1673.46 0.000 1732.88 0.000 1792.30 0.000 1851.73 0.000 1911.15 0.000 1970.58 0.000 2030.00 0.000 2089.43 0.000 2148.85 0.000 2208.28 0.000 2267.70 0.000 2327.13 0.000 2386.55 0.000 2445.98 0.000 2505.40 0.000 2536.75 0.000 2564.83 0.000 2592.79 0.000 2624.25 0.000 2680.85 0.000 2683.68 0.000 2743.10 0.000 2802.53 0.000 2861.95 0.000 2921.38 0.000 2980.80 Comment Kuparuk LCU Miluveach Alaska State Plane Zone 4 PBU_WOA S Pad Continued... 18 November, 1998 - 15:04 -2- DrillQuest Prudhoe Bay Unit Measured Sub-Sea Ve~ical Depth Incl, Azim, Depth Depth (") (") (") 8600.00 42.074 308.514 7218.90 7282.33 8700.00 42.074 308.514 7293.12 7356.55 8800.00 42.074 308.514 7367.35 7430.78 8900.00 42.074 308.514 7441.58 7505.01 9000.00 42.074 308.514 7515.81 7579.24 9046.07 42.074 308.514 7550.00 7613.43 9100.00 42.074 308.514 7590.03 7653.46 9200.00 42.074 308.514 7664.26 7727.69 9288.56 42.074 308.514 7730.00 7793.43 9300.00 42.074 308.514 7738.49 7801.92 9400.00 42.074 308.514 7812.72 7876.15 9500.00 42.074 308.514 7886.94 7950.37 9600.00 42.074 308.514 7961.17 8024.60 9625.37 42.074 308.514 7980.00 8043.43 9700.00 42.074 308.514 8035.40 8098.83 9800.00 42.074 308.514 8109.63 8173.06 9813.98 42.074 308.514 8120.00 8183.43 9900.00 42,074 308,514 8183.85 8247.28 10000.00 42.074 308.514 8258.08 8321.51 10100.00 42.074 308.514 8332.31 8395,74 10150.78 42,074 308.514 8370.00 8433.43 10200.00 42.074 308.514 8406.54 8469.97 10300.00 42.074 308.514 8480.76 8544.19 10366.33 42.074 308.514 8530.00 8593.43 10400.00 42.074 308.514 8554.99 8618.42 10406.75 42.074 308.514 8560.00 8623.43 10460.64 42.074 308.514 8600.00 8663.43 10467.37 42.074 308.514 8605.00 8668.43 10494.32 42.074 308.514 8625.00 8688.43 10500.00 42.729 308.797 8629.20 8692.63 Sperry-Sun Drilling Services Proposal Report for S-24A Wp4 Local Coordinates Global Coordinates Nothings Eastings Nodhings Eastings (") (~) (~) (") 2452.08 N 1968.56W 5982275.45 N 617205.67 E 2493.81N 2020.99W 5982316.34 N 617152.59 E 2535.54 N 2073.42W 5982357.23 N 617099.50 E 2577.27 N 2125.85W 5982398.11N 617046.41E 2618.99 N 2178.28W 5982439.00 N 616993.32 E 2638.22 N 2202.44W 5982457.84 N 616968.86 E 2660.72 N 2230.72W 5982479.89 N 616940.23 E 2702.45 N 2283.15W 5982520.78 N 616887.14 E 2739.41 N 2329.58W 5982556.99 N 616840.12 E 2744.18 N 2335.58W 5982561.67 N 616834.05 E 2785.90 N 2388.01W 5982602.55 N 616780.96 E 2827.63 N 2440.44W 5982643.44 N 616727.87 E 2869.36 N 2492.88W 5982684.33 N 616674.78 E 2879.94 N 2506.18W 5982694.70 N 616661.32 E 2911.09 N 2545.31W 5982725.22 N 616621.70 E 2952.82 N 2597.74W 5982766.11 N 616568.61 E 2958.65 N 2605.07W 5982771.82 N 616561.19 E 2994.54 N 2650.17W 5982807.00 N 616515.52 E 3036.27 N 2702.60W 5982847.88 N 616462.43 E 3078.00 N 2755.03W 5982888.77 N 616409.34 E 3099.19 N 2781.66W 5982909.53 N 616382.38 E 3119.73 N 2807.47W 5982929.66 N 616356.25 E 3161.45 N 2859.90W 5982970.55 N 616303.16 E 3189.13 N 2894.68W 5982997.67 N 616267.95 E 3203.18 N 2912.33W 5983011.44 N 616250.07 E 3206.00 N 2915.87W 5983014.19 N 616246.49 E 3228.48 N 2944.12W 5983036.23 N 616217.88 E 3231.29 N 2947.65W 5983038.98 N 616214.30 E 3242.54 N 2961.78W 5983050.00 N 616200.00 E 3244.93 N 2964.77W 5983052.35 N 616196.97 E Dogleg Ve~ical Rate Section (°/~00,) (.) 0.000 3040.23 0.000 3099.65 0.000 3159.08 0.000 3218.50 0.000 3277.93 0.000 3305.30 0.000 3337.35 0.000 3396.78 0.000 3449.41 0.000 3456.20 0.000 3515.63 0.000 3575.05 0.000 3634.48 0.000 3649.55 0.000 3693.90 0.000 3753.33 0.000 3761.63 0.000 3812.75 0.000 3872.18 0.000 3931.60 0.000 3961.78 0.000 3991.03 0,000 4050.45 0.000 4089.87 0.000 4109.88 0.000 4113.89 0,000 4145.91 0.000 4149.91 0.000 4165.93 12.000 4169.33 Comment Top Kingak/TJI-VTJG TJF TJE TJD TJC TJB TJA Sag River 7" Liner Target: S-24A T1, Geological Alaska State Plane Zone 4 PBU_WOA S Pad Continued... 18 November, 1998- 15:04 -3- DrillQuest Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (~) (~) (~) 10521.97 45.267 309.825 8645.00 8708.43 10600.00 54.340 312,864 8695.32 8758.75 10700.00 66.053 315.882 8744.94 8808.37 10712.85 67,563 316,226 8750.00 8813.43 10751.28 72.081 317.211 8763.25 8826.68 10800.00 72,081 317.211 8778.24 8841.67 10900.00 72.081 317.211 8809.01 8872.44 11000.00 72.081 317.211 8839.78 8903.21 11090.72 72.081 317.211 8867.69 8931.12 11100.00 72.774 318.125 8870.49 8933.92 11200.00 80.460 327.606 8893.67 8957.10 11300.00 88.391 336.662 8903.39 8966.82 11392.85 95.795 345.000 8900.00 8963.43 11400.00 95.900 345,856 8899.27 8962.70 11500.00 97.225 357.862 8887.80 8951.23 11600.00 98.236 9.930 8874.30 8937.73 11617.26 98.375 12.018 8871.81 8935.24 11700.00 98.375 12.018 8859.76 8923.19 11800.00 98.375 12.018 8845.19 8908.62 11900.00 98.375 12.018 8830.63 8894.06 11936.41 98.375 12.018 8825.32 8888.75 12000.00 93.383 15,980 8818.81 8882.24 12100.00 85.510 22.150 8819.77 8883.20 12147.28 81.800 25.100 8825.00 8888.43 12200.00 76.550 25.588 8834.90 8898.33 12208.39 75.715 25.667 8836.91 8900.34 12300.00 75.715 25.667 8859.51 8922.94 12400.00 75,715 25.667 8884.19 8947.62 12402.24 75.715 25.667 8884.74 8948.17 12500.00 83.493 26.497 8902.37 8965.80 Sperry-Sun Drilling Services Proposal Report for S-24A Wp4 Local Coordinates Northings Eastings (ft) (ft) Global Coordinates Dogleg Northings Eastings Rate (fi) (fi) (°/100fi) Vertical Section Comment (ft) 3254.60 N 2976.58W 3294.00 N 3021.20W 3354.67 N 3083.01W 3363.17 N 3091.21W 3389.43 N 3115.93W 3423.44 N 3147.42W 3493.27 N 3212.05W 3563.10 N 3276.69W 3626.45 N 3335.33W 3632.98 N 3341.28W 3710.46 N 3399.79W 3798.31 N 3446.18W 3885.81N 3476.61W 3892.70 N 3478.40W 3990.85 N 3492.46W 4089.52 N 3485.75W 4106.29 N 3482,50W 4186.35 N 3465.45W 4283.12 N 3444.85W 4379.88 N 3424.25W 4415.11N 3416.75W 4476.46 N 3401.45W 4570.85 N 3368.83W 4613.89 N 3350.01W 4660.67 N 3327.85W 4668.01 N 3324.33W 4748.03 N 3285.88W 4835.38 N 3243.90W 4837.33 N 3242.96W 4923.63 N 3200.71W 5983061.83 N 616185.01 E 12.000 4182.96 5983100.51N 616139.77 E 12.000 4237.09 5983160.19 N 616077.00 E 12,000 4317.62 5983168.56 N 616068.67 E 12,000 4328.72 5983194.42 N 616043.53 E 12.000 4362.76 5983227.93 N 616011.51E 0.000 4406.63 5983296.72 N 615945.77 E 0.000 4496.69 5983365.51N 615880.03 E 0.000 4586.75 5983427.92 N 615820.39 E 0.000 4668.45 5983434.36 N 615814.33 E 12.000 4676.85 5983510.90 N 615754.60 E 12.000 4771.41 5983598.00 N 615706.82 E,, 12,000 4870.52 5983685.00 N 615675.00E/" 12.000 4962.84 5983691.86 N 615673.10 E 12.000 4969.86 5983789.77 N 615657.49 E 12.000 5065.26 5983888.54 N 615662.62 E 12.000 5152.71 5983905.36 N 615665.61 E 12,000 5166.71 5983985.68 N 615681.37 E 0.000 5232.95 5984082.76 N 615700.43 E 0.000 5313.01 5984179.84 N 615719.49 E 0.000 5393.07 5984215.19 N 615726.43 E 0.000 5422.22 5984276.77 N 615740.75 E 10,000 5472.06 5984371.67 N 615771.87 E 10.000 5545.07 5984415.00 N 615790.00 E 10.000 5576.76 5984462.13 N 615811.41 E 10.000 5610.52 5984469.53 N 615814.81 E 10,000 5615.79 5984550.15 N 615851.99 E 0.000 5673.30 5984638.15 N 615892.57 E 0.000 5736.07 5984640.12 N 615893.48 E 0,000 5737.48 5984727.08 N 615934.35 E 8.000 5799.18 Shublik Top Sadlerochtt/TZ~, Target: $-24A T2, Geological Target: S-24A T3, Geological Alaska State Plane Zone 4 PBU_WOA S Pad Continued... 18 November, 1998- 15:04 -4. DrillQuest Sperry-Sun Drilling Services Proposal Report for S-24A Wp4 Prudhoe Bay Unit Measured Sub-Sea Ve~ical Local Coordinates Depth Incl. Azim. Depth Depth Nothings Eastings (~) (~) (~) (~) (~) 12600.00 91.451 27.320 8906.78 8970.21 5012.64 N 3155.53W 12682.30 98.000 28.000 8900.00 8963.43 5085.25 N 3117.48W 12700.00 99.111 28.888 8897.37 8960.80 5100.64 N 3109.14W 12760.55 102.893 31.972 8885.81 8949.24 5151.88 N 3079.06W 12800.00 102.893 31.972 8877.01 8940.44 5184.50 N 3058.70W 12872.85 102.893 31.972 8860.75 8924.18 5244.74 N 3021.10W 12900.00 101.272 32.137 8855.07 8918.50 5267.24 N 3007.00W 13000.00 95.301 32.734 8840.66 8904.09 5350.72 N 2953.95W 13100.00 89.330 33.318 8836.62 8900.05 5434.45 N 2899.52W 13200.00 83.358 33.904 8843.00 8906.43 5517.53 N 2844.30W 13216.14 82.394 34.000 8845.00 8908.43 5530.82 N 2835.35W 13238.86 82.394 35.375 8848.01 8911.44 5549.33 N 2822.54W 13300.00 82.394 35.375 8856.10 8919.53 5598.74 N 2787.46W 13400.00 82.394 35.375 8869.33 8932.76 5679.56 N 2730.07W 13500.00 82.394 35.375 8882.57 8946.00 5760.39 N 2672.69W 13600.00 82.394 35.375 8895.80 8959.23 5841.21 N 2615.31W 13700.00 82.394 35.375 8909.04 8972.47 5922.03 N 2557.92W 13800.00 82.394 35.375 8922.27 8985.70 6002.85 N 2500.54W 13820.59 82.394 35.375 8925.00 8988.43 6019.49 N 2488.72W 13858.37 82.394 35.375 8930.00 8993.43 6050.02 N 2467.05W Global Coordinates Dogleg Nothings Eastings Rate (fl) (fl) (°/lOOff) 5984816.80 N 615978.11E 8.000 5984890.00 N 616015.00 E 8.000 5984905.52 N 616023.09 E 8.000 5984957.23 N 616052.36 E 8.000 5984990.17 N 616072.20 E 0.000 5985051.00 N 616108.83 E 0.000 5985073.73 N 616122.57 E 6.000 5985158.04 N 616174.28 E 6.000 5985242.63 N 616227.38 E 6.000 5985326.57 N 616281.27 E 6.000 5985340.00 N 616290.00 E 6.000 5985358.71N 616302.52 E 6.000 5985408.68 N 616336.81 E 0.000 5985490.41N 616392.90 E 0.000 5985572.13 N 616448.99 E 0.000 5985653.85 N 616505.08 E 0.000 5985735.58 N 616561.17 E 0.000 5985817.30 N 616617.26 E 0.000 5985834.13 N 616628.81E 0.000 5985865.00 N 616650.00 E/' 0.000 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Vedical Section Comment (fi) 5862.17 5913.07 Target:S-24A T4, Geological 5923.74 5958.35 5979.89 6019.67 6034.51 6089.25 6143.66 6197.15 6205.66 Target:S-24A T5, Geological 6217.37 6248.28 6298.83 6349.39 6399.94 6450.49 6501.04 6511.45 TZ3 6530.55 4 1/2" Liner Target:S-24A T6, Geological Alaska State Plane Zone 4 PBU_WOA S Pad The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 336.039° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13858.37ft., The Bottom Hole Displacement is 6533.69ft., in the Direction of 337.816° (True). Continued... 18 November, 1998- 15:04 -5- DrillQuest Prudhoe Bay Unit Formation Tops Measured Ve~ical Sub-Sea Depth Depth Depth Nothings (~) (~) (~) (~) 4653.36 4363.43 4300.00 771.65 N 5597.21 5053.43 4990.00 1199.09 N 5880.12 5263.43 5200.00 1317.14 N 7752.75 6653.43 6590.00 2098.54 N 7847.05 6723.43 6660.00 2137.90 N 7995.24 6833.43 6770.00 2199.73 N 9046.07 7613.43 7550.00 2638.22 N 9288.56 7793.43 7730.00 2739.41N 9625.37 8043.43 7980.00 2879.94 N 9813.98 8183.43 8120.00 2958.65 N 10150.78 8433.43 8370.00 3099.19 N 10366.33 8593.43 8530.00 3189.13 N 10406.75 8623.43 8560.00 3206.00 N 10460.64 8663.43 8600.00 3228.48 N 10521.97 8708.43 8645.00 3254.60 N 10712.85 8813.43 8750.00 3363.17 N 13820.59 8988.43 8925.00 6019.49 N Sperry-Sun Drilling Services Eastings Formation Name (fi) 81.62 E UG1/UgS 394.14W WS1/West Sak 542.48W CM3/K-12 1524.33W Kuparuk 1573.77W LCU 1651.47W Miluveach 2202.44W Top Kingak/TJH/TJG 2329.58W TJF 2506.18W TJE 2605.07W TJD 2781.66W TJC 2894.68W TJB 2915.87W TJA 2944.12W Sag River 2976.58W Shublik 3091.21W Top Sadlerochit/TZ4 2488.72W TZ3 Proposal Report for S-24A Wp4 Alaska State Plane Zone 4 PBU_WOA S Pad Continued... 18 November, 1998.15:04 -6- DrillQuest S-24 Wellhead: Nabors 7ES: 'X' Nipple @ 2200' 13-3/8", 72#, L-80 BF / NtSL = 37.05' KB / MSL = 63.43' 6 Gas Lift Mandrels 7", 26~ L-80 BTC-Mod Liner Top 9-5/8" Milled section from 3800' to 17# K~O. C~rnent Plug -~LUDdzontal Side~ AFE #4Pt200 30 Days $3,379 APl #50-029-22044-0t Zone 4 Development Injection Target 7" L-80 Intermediate Casing to TSag 4-1/2" L-80 Cemented Liner 4-1/2" L-80 NSCT Completion Designed for future CTU sidetrack 4-W2", 12.6~, L-80 NSCT Tubing 7" x 4.5" Baker Packer ~ 4-1/2", 12.6# L-80 IBT-Mod Production Liner Top 7" Shoe @ TSag ~ Shoe 9734~ Sqz'd Perforations: 9834' - 10,t32' DATE REV. BY 11/19/98 CMJ COMMENTS Proposed Completion PBTD 7" 26~ L-80 PJ~U~E. BAY~.UNIT BP Exploration ...hared ervices a rilling WELL NAME S-24Ai DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET IThe attached work cannot commence without obtaining the required signatures in the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: (only one category per cover sheet) ~'] DRILLING PERMIT SUNDRY NOTICE ['~ Permit Documentation Prepared: pODE: ~2.~~~'~ Date:X.¢e~ ermitrA, pplication ~e~ewed: ~ SDE~S~W~ff ' I xl pe~~~}?n ~b~tted: TA: ~~~ Date: P~/~ ---i Sundry Documentation Prepared: ODE: Date: "--]Sundry Application Reviewed: SDE/ES: Date: [~] Sundry Application Submitted: TA: Date: NOTE: IF SUNDRY IS FOR PRE-RIG WORK, USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW PRE-RIG WORK [--~ Pre-Rig Memo Reviewed: SDE/ES: Date: [ [ Pre-Rig Memo Sent to Slope: ODE: Date: ]--"[ Pre-Rig Sundry Documentation Prepared: ODE: Date: ~ Pre-Rig Sundry Application Reviewed: SDE/ES: Date: ] [ Pre-Rig Sundry Application Submitted: TA: Date: Reason for Sundry (Check all that apply) Abandon Alter Casing Suspend Repair Well Plugging Pull Tubing Variance Change Approved Program Operation Shutdown Re-enter Suspended Well Time Extension Perforate Stimulate Other(Explain): APPROVAL TO PROCEED Approved AOGCC Permit/Sundry Received TA: Date: Approval to Commence Operations SDE/ES: Date~ _ hared ',, er.vices nlling WELL NAME S-24Ai DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET IThe attached work cannot commence without obtaining the required signatures in the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: (only one category per cover sheet) DRILLING PERMIT ,, Permit Documentation Prepared: ODE: ~.2.~ Date:'¢q/q~ ~Permit/~pplication J~e2fi.ewed: SDE/ES~-~ ~/' n~ Permi(/)p~, J~j~},on Submitted: IA: C-~ ~7,~'~- Date:/./~¢/~/( SUNDRY NOTICE [~] Sundry Documentation Prepared: ODE: Date: D Sundry Application Reviewed: SDE/ES: Date: D Sundry Application Submitted: TA: Date: NOTE: IF SUNDRY IS FOR PRE-RIG WORK, USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW PRE-RIG WORK Pre-Rig Memo Reviewed: SDE/ES: Date: Pre-Rig Memo Sent to Slope: ODE: Date: Pre-Rig Sundry Documentation Prepared: ODE: Date: Pre-Rig Sundry Application Reviewed: SDE/ES: Date: Pre-Rig Sundry Application Submitted: TA: Date: Reason for Sundry (Check all that apply) Abandon Alter Casing Suspend Repair Well Plugging Pull Tubing Variance Other(Explain): Change Approved Program Operation Shutdown Re-enter Suspended Well Time Extension Perforate Stimulate APPROVAL TO PROCEED Approved AOGCC Permit/Sundry Received TA: Date: Approval to Commence Operations SDE/ES: Date~ _ hared ......... .ry(ces Alask; nll ng WELL NAME S-24Ai DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET IThe attached work cannot commence without obtaining the required signatures in I the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. I "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: (only one category per cover sheet) DRILLING PERMIT [~] Permit Documentation Prepared: ODE: 0.2.~ Date:X,¢~ [~Permit/~pplic ati..o-n e~ewed: ~ SDE/ES~W~' ~ Date:///~~ I~l eermiC/~PruP}l~,on S~.ubmitted: TA: t_~ ~I~.~~ - Date:/.t/~¢'~/ PRE-RIG WORK Pre-Rig Memo Reviewed: SDE/ES: Date:~ Pre-Rig Memo Sent to Slope: ODE: Date:~ Pre-Rig Sundry Documentation Prepared: ODE: Date:~ Pre-Rig Sundry Application Reviewed: SDE/ES: Date: Pre-Rig Sundry Application Submitted: TA: Date:__ SUNDRY NOTICE D Sundry Documentation Prepared: ODE: Date: D Sundry Application Reviewed: SDE/ES: Date:~ ["~ Sundry Application Submitted: TA: Date: NOTE: IF SUNDRY IS FOR PRE-RIG WORK~ USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW Reason for Sundry (Check all that apply) Abandon Change Approved Program Alter Casing Operation Shutdown Suspend Re-enter Suspended Well Repair Well Time Extension Plugging Perforate Pull Tubing Stimulate Variance Other(Explain): I APPROVAL TO PROCEED I Approved AOGCC Permit/Sundry Received TA: Date: Approval to Commence Operations SDE/ES: Date: I DATE / [ CHECK"O. / VENDOR /~LASKAST 1 4 OO DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET O& 149c; CKO& 1499A 100. OC 100. OC HANDLING INST: S/k TERRI HUBBLI: X462B ~ THE ATrACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. ml[e]lE'llE -~ 100. O0 100. O0 BP EXPLORATION (ALASKA);:;:.I, NC.;. · i ";:i ' : "i AN;:i~F~iLIATE.~'F: .;;i:i', ..... ' RO."BOX: ;196612 !':,i!. i, ."': ;:: :';~, :' AN~:HoRAGEiALASKX'?'99519-6612 ~:::'~;:, ~'/ ':::::''~ ....":"::"'" ::~':'' :;.'::': ...... ~EEVEEANO, OR,'o .,,, . · :,;~:.:~., ~:,~ :~:' :;:,:,.: :';':: ': .:;~;~;]':~:389 :',;[ :,::', ,:'[.: :::.:., 412 No,. ,H 3:0 9:, 91 PAY ,,Ti]:' The!: :ORDER ' 0-~ ,' ;1, 53,0 cl ci,' ~:0 h ]. 80 ~,8 cl 5': 008 h H143098 09/21/e8 00i43068 VENDOR ALASKAST] 4 CT> DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS I DISCOUNT NET 09219B CKO92!9SE I00. O0I i00. O0 HANDLING INST' i i ¢ o. BP EXPLORATION (ALASKA), INC. P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 FIRST NATIONAL BANK OF ASHLAND AN AFFILIATE OF NATIONAL CITY BANK CLEVELAND, OHIO 56 -389 412 No. H 143068 CONSOLIDATED COMMERCIAL ACCOUNT 00143068 PAY To The O~'de~ O.~ ONE HUNDRED & ******************************************* US DOLLAR ALASKA STATE DEPI OF REVENUE 3OO1 PORCUPINE DR ANCHORAQE 99501-3120 DATE AMOUNT 09/2i/98 1 [ $10C).0C)I NOT VALID AFTER 120 DAYS WELL NAME/~/ ~"---~'"/~),~ PROGRAM: exp ann. disposal para req FIELD & POOL. ~ ~//~/~s",,'5 INIT CLASS /- ~ ~'~ ADMINISTRATION 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ D,~TE / 12. Permit can be issued without administrative approval ...... ~~"13. Can permit be approved before 15-day wait ........... ENGINEERING 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive hodzons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. '.: 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ DATE 26. BOPE press rating appropriate; test to ~ ~--.~30 psig.  27. Choke manifold complies w/APl RP-53 (May 84) 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. dev redrll ~ serv ~ wellbore seg GEOL AREA ~' ~;) UNIT# N N ,~ N 7~ ON/OFF SHORE Y N (~N (~)N (~ N Y N N GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N /,,/ 31. Data presented on potential overpressure zones ....... Y,,~,. ,~j ~/ 32. Seismic analysis of shallow gas zones ............. .,Y/' N /' / iv'/'/- / ,.~ 33. Seabed condition survey (if off-shore) ............. //Y N / - 34. Contact name/phone for weekly progress reports [exploratory ~]~ly] Y N ANNULAR DISPOSAL APPR DATE 35. With proper cementing records, th?~af~ (A) will contain waste in a~suffaSle rece/iyifig zone; ..... ,.:... Y N (B) will not contamin~ate~freshwater~ cause drilling w_..as~l~:.. Y U to su~ace; ~ / _ ~A_ (C) will n~~f~el~ ~ed for disposal; Y N (D) will ~impai~ov~m a Y N po~; and (E) will not circumvent 20 ~C 25.252 or 20 ~C 25.412. Y N GEO~J~Y; ENGINEERING: UIC/An~f COMMISSION: JDH .-.:, RNC Comments/Instructions: , ,, c:~nsoffice\wordian\diana\checklist FIELD & POOL. __.~'~...~::~..~'<:~' WELL PERMIT CHECKLIST COMPANY WELl_ NAME AREA ADMINISTRATION 1. 2. 3 4 5. 6. 7. 8. 9. 10. 11. APPR A'I 12. ENGINEERING INIT CLASS ,/-' ~.,,./, ,~,,"7- ...':__- ..... lz Permit fee attached ....................... Lease number appropriate .................. Unique well name and number. ............... Well Iocaled in a defined pool ................ Well located proper dislance from drilling unit bot, ndmy .... Well located proper distance from other wells .......... Sufficient acreage available in drilling [Init ............ If deviated, is wellbore plat included ............... Operator only affected party ................... Operator has appropriate bond in force ............. Permit can be issued without conservation order ........ Permit can be issued without administrative approval ...... Can permit be approved before 15-day wait ........... DA'rE 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMl- vol adequate to circulate on conductor & surf csg ..... 17. CM I' vol adequate to tie-in long string to surf csg ........ 18. CM I' will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a ~10-403 for abandonmenl been approved... 22. Adequate wellbore separation proposed ............. 23. If diveder required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to__,A--O (3 ~ psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures ..... 31. Data presented on potential overpressure zones ....... 32. Seismic analysis of shallow gas zones ..... ' ........ 33 Seabed condition survey (if off-shore) ............. AJ~)R DATE,, 34. Contact name/phon.e_for weekly progress reports ....... ~_~___///~2_~//~_/~ [exploratory only] ANNULAR DISPOSAL 35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone!,.g/... APPF~ I)A'1'E (B) will not cont,aminale freshwater; or cause~g waste.. , Io .surface; (.,__..__ ~ ................................(C) will riOl impair mechanical int~,~jrffy o~TTi~m~ ulL~d for disposal; (D) will nol damage produci~pej~on'nation or impair rec~om a , , .......................... pool; and ,(E) will nol circ~ AAO 25.252 or 20 AAO 25.412. GEOL ~"-.,~- ,~7""~,~'" PROGRAM: exp ~J dev [] redrll~serv_~wellbore seg II ann. disposal para ~? 0 UNIT// ,~"'//~::::~__.__ ON/OFF SHORE ~::~..~__. N N N N ~::)N Y N M c, hekhsl ~*';v 05/2919[I G E _O__L,,~,,,QG Y: ENGINEERING: U I~'_r COMMISSION: co Cornmentsllnstructions: dll C \ru~nfh( r!~w¢~uliau\dul~ I; ,\r I," I' h' I