Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
198-226
Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. / ~ ~"~-'~ ¢ File Number of Well History File PAGES TO DELETE Complete RESCAN Color items - Pages: Grayscale, halftones, pictures, graphs, charts Pages: Poor Quality Original'- Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned by(~ Mildred Daretha Nathan Lowell Date:c~.]~_~ Isl ~ [] TO RE-SCAN Notes: Re-Scanned by: Bevedy Mildred Damtha Nathan Lowell Date: Is/ 198-226-0 MILNE PT UNIT KR F-84 50- 029-22931-00 BP EXPLORATION (ALASKA) ~C Roll #1: Start: Stop Roll #2: Start Stop MD 12236 TVD 06956 Completion Date: 12/11/98 Completed Status: 1-OIL Current: P&A T Name Interval Sent Received T/C/D t~L CMT FINAL 10000-11100 CH 5 4/15/99 4/27/99 ~ IMP-CDR/GST-MD FINAL 250-12190 OH 2/17/99 2/24/99 ~,/L IMP-CDR/GST-TVD FINAL 250-4956 OH 2/17/99 2/24/99 ~R GYRO CONT MULTI GYRODATA 0-10100 OH 2/11/99 2/11/99 b/~ SRVY RPT SCHLUM 0-12236.28 OH 2/11/99 2/11/99 t//T 9000 1-4 SCHLUM CDR/GR/GST/IMP OH 2/17/99 2/24/99 Thursday, January 18, 2001 Page 1 of 1 OLUGGi2,- =' =~ LOC_%TION CLE:~_~_~CE REPORT We i ! Cpera:~r Review ~"~--e we~__~ ____== ~ o, and- c~-~.~: on ptuqcjing, well head s = !o=a ' 'i~-loc. c: .~~ ~!u=s ell - Locaci:n Cleara~cm: Signed Date STATE OF ALASKA ALASK,.- OIL AND GAS CONSERVATION COMk~i~SSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Plugged Back for Sidetrack 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended..-[].Aba?,~oned [] Service 2. Name of Operator : D,~'-,T;~ ~ ~ _ 7. Permit Number BP Exploration (Alaska) Inc. ! _L_2_~_/':..~.~_ 6: 198-226 300-105 3. Address~' ~}' '~"~"~"~ ~ ~ ~~ 8. APl Number 4. Location of well at surface ,""~' 9. Unit or Lease Name 2040' NSL, 2976' WEL, SEC. 06, T13N, R10E, UM Milne Point Unit At top of productive inte~al 0R[GINAL 2973' NSL, 303' WEL, SEC. 02, T13N, R09E, UM 10. Well Number At total depth MPF-84 3630' NSL, 958' WEL, SEC. 02, T13N, R09E, UM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool Milne Point Unit / Kuparuk River Sands KBE = 44.08' ADL 388235 12. Date Spudded11,21,98 113' Date T'D' Reached 114' Date c°mp'' Susp'' °r Aband'l W5/98 5/25/2000 115' Water depth' if °ffsh°reN/A MSL 116' N°' °f C°mpleti°nsZero 17. Total Depth (MD+TVD)~ 18. Plug Back Depth (MD+~D) ~19. Directional Su~ey ~ 20. Depth where SSSV set~ 21. Thickness of Permafrost 12236 6956 F;J 10865 6672 F~I D Yes ~ No~ N/A MDI 1800' (Approx.) 22. Type Electric or Other Logs Run MWD / LWD. Gyro 23. CASING, LINER AND CEMENTING RECORD CASING S~ING DEPTH HO~ SIZE WT. PER FT. GRADE TOP ao~ou S~ZE CEMENTING RECORD AMOUNT PULLED 20" 91.1 ~ H-40 Sudace 112' 24" 250 sx Arcticset I (Approx.) 9-5/8" 40~/47~ L-80 36' 5833' 12-1/4" 1300 sx PF 'E', 330 sx 'G', 170 sx PF 'C 7" 29ff L-80 33' 11252' 8-1/2" 165 sx Class 'G' 4-1/2" 12.6~ L-80 11297' 11550' 6" ~0 sx Class 'G' 24. Pedorations open to Production (MD+~D of Top and' 25. TUBING RECORD Bottom and inte~al, size and number) SIZE DEPTH SET (MD) PACKER S~ (MD) None None MD ~D :~ ~ .~ ,.,;MD_ .... ~D ~.;;~ ~ ~'~' %,, ~-,,? 26. ACID, F~CTURE, CEMENT SQUEEZE, ETC. ~:,.,-.~ DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED ~ ~ ,.c~ ~--~ "~ ~ ......... · 11112' - 11297' Milled up 4-1/2" Casing, for planned window 11252' P~ / Kick Off Plug with 25 Bbls Class 'G' ,-~.~: t.~ ~.~ ~..; ;~';~;;¥;, ~''''' ~';~'~;~' 10865' Set Whipstock on top of Bridge Plug 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Not on Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE ~ GAs-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCU~TED OIL-BBL GAS-MCF WATER-BBL O~L G~w~-API (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Top KC 1 11198' 6875' Kuparuk A3 11281' 6886' KA3L 11298' 6893' Kuparuk A2 11341' 6910' Kuparuk A1 11372' 6920' Miluveach 11629' 6959' A-:- :.'~' '" 31. List of Attachments: Summary of Daily Drilling Fleports 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubb,e ....~~,''/ ~ Title TechnicalAssistant Date O~)"~..~"Oo MPF-84 198-226 300-105 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. iNSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility Date/Time 12 May 00 13 May 00 M Pt F Pad 12:00-15:00 12:00-15:00 15:00 15:00-16:30 15:00-16:30 16:30 16:30-19:30 16:30-19:30 Duration 3hr 3 hr 1-1/2 hr 1-1/2 hr 3 hr 3hr 19:30 19:30-22:00 19:30-20:00 20:00 20:00-22:00 22:00 22:00-00:30 22:00-00:30 00:30 00:30-03:00 00:30-03:00 03:00 03:00-05:00 03:00-04:00 04:00 04:00-05:00 05:00 2-1/2 hr 1/2 hr 2hr 2-1/2 hr 2-1/2 hr 2-1/2 hr 2-1/2 hr 2hr 1 hr lhr Progress Report Well MPF-84A Page 1 Rig Nabors 4ES Date 30 May 00 Activity Fluid system Fill pits with Seawater Completed operations Wellhead work Removed Hanger plug Equipment work completed Fluid system Circulated at 11080.0 ft Check Pressure well Psi. O on each side & circ. freeze protection Hole displaced with Seawater - 100.00 % displaced Wellhead work Installed Hanger plug Equipment work completed Removed Xmas tree Equipment work completed Nipple up BOP stack Installed BOP stack Equipment work completed Test well control equipment Tested BOP stack Pressure test completed successfully - 3500.000 psi Test Waived by Lew Grimmaldi. with AOGC. Wellhead work Removed Hanger plug Equipment work completed Removed Tubing hanger ~ ~,?" Equipment work completed ~% ~'~:~ ~ 05:00-06:00 05:00-06:00 06:00 06:00-16:30 06:00-16:30 16:30 16:30-18:30 16:30-18:30 18:30 18:30-06:00 18:30-20:30 20:30 20:30-06:00 14 May 00 06:00 06:00-21:00 06:00-08:00 08:00 08:00-15:00 1 hr 1 hr 10-1/2 hr 10-1/2 hr 2hr 2 hr 11-1/2 hr 2hr 9-1/2 hr 15hr 2 hr 7hr Pull Tubing, 3-1/2in O.D. Laid down 250.0 ft of Tubing Stopped · To hold safety meeting Pull Tubing, 3-1/2in O.D. (cont...) Laid down 11080.0 ft of Tubing 350 joints laid out Wellhead work Installed B ore protector Set Wear ring & rilds & rig floor to run fta # 1 Equipment work completed BHA run no. 1 Made up BHA no. 1 Make up FTA #1 Wash over Shoe+3-ext. bowls+top sub+bumper sub+j ars+ 10-dc=367.04 BHA no. 1 made up Singled in drill pipe to 10550.0 ft single in drll pipe with fta #1 Stopped · To hold safety meeting BHA run no. 1 (cont...) Singled in drill pipe to 11079.0 ft tag tbg. stub @ 11079' & lay dn 1-jt. & mu 2-subs & kelly up On bottom Milled Permanent packer at 11080.0 ft Change over to Milling fluid & wash over stub & attempt to wash over pkr. (it got to the point that Progress Report Facility M Pt F Pad Well MPF-84A Page 2 Rig Nabors 4ES Date 30 May 00 Date/Time Duration Activity 15:00 15:00-21:00 21:00 21:00-06:00 21:00-23:00 15 May 00 23:00 23:00-03:00 03:00 03:00-06:00 06:00 06:00-23:30 06:00-10:00 10:00 10:00-11:30 11:30 11:30-17:00 17:00 17:00-18:00 18:00 18:00-23:30 23:30 23:30-06:00 23:30-03:30 16 May 00 03:30 03:30-04:00 04:00 04:00-06:00 06:00 06:00-10:30 06:00-10:30 10:30 10:30-06:00 10:30-14:30 14:30 14:30-06:00 6 hr 9hr 2hr 4hr 3hr 17-1/2 hr 4 hr 1-1/2 hr 5-1/2 hr lhr 5-1/2 hr 6-1/2 hr 4hr 1/2 hr 2 hr 4-1/2 hr 4-1/2 hr 19-1/2 hr 4 hr 15-1/2 hr Completed operations Pulled out of hole to 0.0 ft Pooh & Lay dn & investigate washover shoe & top sub & clean baskets . No recovery in boot baskets & washover shoe showed no wear. Stopped: To pick up/lay out tubulars BHA run no. 2 Made up BHA no. 2 FTA # 2 6" BN Packer Mill+3-boot baskets+bit sub+Bumper sub+Oil Jar+10-dc=345.68 BHA no. 2 made up R.I.H. to 11069.0 ft rih to 11069' 4es kb On bottom Milled Pup joint at 11072.0 ft Tag & kelly up & mill on tbg. 11069' to 11072' On bottom BHA run no. 2 (cont...) Milled Permanent packer at 11078.0 ft Mud pumps failed - Work string Serviced Mud pumps Equipment work completed Milled Permanent packer at 11082.0 ft Completed operations Circulated at 11082.0 ft mix & pump 20-bbl. barazan pill & spot. 20.000 bbl LCM pill spotted downhole, LCM content 0.0 lb/bbl Pulled out of hole to 0.0 ft pooh & lay dn FTA # 2 Stopped: To pick up/lay out tubulars BHA run no. 3 R.I.H. to 11082.0 ft MU FTA #3 Spear+Ext+Xo+Bumper jars+Jars+10-dc =342.38 On bottom Fished at 11082.0 ft pu kelly & sting into packer & pull 25k over to pull free. Latched fish Pulled out of hole to 10000.0 ft Stopped: To hold safety meeting BHA run no. 3 (cont...) Pulled out of hole to 0.0 ft pooh & lay dn packer & tailpipe assy. Fish at surface BHA run no. 4 R.I.H. to 11102.0 ft Make up FTA # 4 ** 6" Packer mill+3-boot baskets+bit sub+bumper sub+jars+10-dc=346.96 On bottom Milled Permanent packer at 11114.0 ft rih & tag 5 x 7 ZXP liner top packer & mill same total of 12' mill seem to be worn. Progress Report Facility M Pt F Pad Well MPF-84A Page 3 Rig Nabors 4ES Date 30 May 00 Date/Time 17 May 00 06:00 06:00-10:30 06:00-10:30 10:30 10:30-06:00 10:30-11:30 11:30 11:30-14:30 14:30 14:30-06:00 18 May 00 06:00 06:00-03:00 06:00-10:00 10:00 10:00-11:00 11:00 11:00-11:30 11:30 11:30-12:30 12:30 12:30-22:30 22:30 22:30-03:00 19 May 00 03:00 03:00-06:00 03:00-03:30 03:30 03:30-06:00 06:00 06:00-06:00 06:00-09:00 09:00 09:00-01:00 20May 00 01:00 01:00-03:30 Duration 4-1/2 hr 4-1/2 hr 19-1/2 hr 1 hr 3hr 15-1/2 hr 21hr 4hr lhr 1/2 hr lhr lOhr 4-1/2 hr 3hr 1/2 hr 2-1/2 hr 24 hr 3hr 16hr 2-1/2 hr Activity ROP dropped from 2.0 ft/hr to 3.0 fi/hr - Mill quit BHA run no. 4 (cont...) Pulled out of hole to 0.0 ft pooh & lay dn FTA #4 & inspect packer mill & clean baskets (packer mill 10 % wear) Stopped · To pick up/lay out tubulars BHA run no. 5 Made up BHA no. 5 FTA # 5 = 6" mill+3- boot baskets + bit sub+ bumper sub+jars+10- dc =347.16 BHA no. 5 made up R.I.H. to 11114.0 ft On bottom Milled Liner hanger at 11126.0 ft Mill on liner hanger at different rotary speeds & wts. Rec. 276# metal recovered last 24-hrs. total for liner pkr. & hanger =542# On bottom BHA run no. 5 (cont...) Milled Casing at 11152.0 ft mill 4.5" liner F/11126' to 11152' Rig equipment failed - Circulate Serviced Mud pumps Equipment work completed Milled Casing at 11153.0 ft mill 11152/11153/ Observed change in Cutting volumes Circulated at 11153.0 ft circ. & condition mud & equipment. Obtained req. fluid properties - 50.00 %, hole vol. Milled Casing at 11198.0 ft mil 4.5" 12.6# liner F/11153' to 11198' (milling liner was radical not all feet milled consistent ) ROP dropped from 4.0 ft/hr to 0.5 ft/hr - Mill quit Pulled out of hole to 0.0 ft pooh & lay dn FTA # 5 mill 85% worn out. Stopped · To pick up/lay out tubulars BHA run no. 6 Made up BHA no. 6 FTA # 6 5-7/8" mill + bit sub+cushion sub+4-dc+b. j ars+j ars+6-dc=346.65 BHA no. 6 made up R.I.H. to 3166.0 ft Stopped · To hold safety meeting BHA run no. 6 (cont...) R.I.H. to 11198.0 ft On bottom Milled Liner at 11283.0 ft Mill liner F/11198' to 11283' running sweeps etc. Observed 50.00 klb drag on connections Reamed to 11283.0 ft While making a connection well had drag & would packoff & stick pipe, work &jar pipe free & get :-'- position to Progress Report Facility M Pt F Pad Well MPF-84A Page 4 Rig Nabors 4ES Date 30 May 00 Date/Time 03:30 03:30-06:00 06:00 06:00-06:00 06:00-23:30 23:30 23:30-06:00 21 May 00 06:00 06:00-13:30 06:00-06:30 06:30 06:30-08:30 08:30 08:30-13:30 13:30 13:30-02:30 13:30-15:30 15:30 15:30-22:30 22:30 22:30-02:30 22 May 00 02:30 02:30-06:00 02:30-04:30 04:30 04:30-06:00 06:00 06:00-06:00 Duration 2-1/2 hr 24 hr 17-1/2 hr 6-1/2 hr 7-1/2 hr 1/2 hr 2 hr 5hr 13hr 2 hr 7 hr 4 hr 3-1/2 hr 2 hr 1-1/2 hr 24 hr Activity iron + shale + cement.. Observed 50.00 klb resistance Reamed to 11183.0 ft circ. & condition well bore Note: when mill is beginning to enter hole below shoe of 7" we are having to feather it with wt. or it will stall rotary & pressure up .& pack off. the shale coming out is rounded as if it is coming out of a washout. Stopped: To hold safety meeting BHA run no. 6 (cont...) Washed to 11284.0 ft wash & ream & condition well bore hole packing off & sticking tools at all different areas etc while raising mud wt. to 10.1 and well bore begin cleaning up after wt. passed 9.6 ppg. (tough Job) hydrostatic seem to be the right application. On bottom Milled Liner at 11293.0 ft mill liner F/11283' to 11293' (mill seems wore but should finish the job) On bottom BHA run no. 6 (cont...) Milled Liner at 11297.0 ft mill liner F/11293 to 11297' Completed operations Circulated at 11297.0 ft circ. & work pipe to prep for cmt. plug. Obtained clean returns - 150.00 % hole volume Pulled out of hole to 0.0 ft pooh & lay dn FTA # 6 Stopped: To pick up/lay out tubulars BHA run no. 7 Made up BHA no. 7 Make up BHA # 7 16-Jts. 2-3/8" & mule shoe + 497.58' BHA no. 7 made up R.I.H. to 11260.0 ft rih with bha # 7 Stinger to cmt. whhile working stinger dn into open hole it became evident from the signals that well bore was sending that well bore was not ready for a cmt. job. well bore was pressuring up etc. Observed loss of 25.00 klb string weight Pulled out of hole to 0.0 ft pooh & lay dn bha # 7 Stopped: To pick up/lay out tubulars BHA run no. 8 Made up BHA no. 8 BHA # 8 - 6" bit +bit sub+bumper sub+6-dc+jars+3-dc =303.57' BHA no. 8 made up R.I.H. to 2500.0 ft rih with bha # 8 to condition hole for plug. Stopped: To hold safety meeting BHA run no. 8 (cont...) Facility M Pt F Pad Progress Report Well MPF-84A Page 5 Rig Nabors 4ES Date 30 May 00 Date/Time 06:00-07:00 07:00 07:00-09:30 09:30 09:30-12:00 12:00 12:00-13:00 13:00 13:00-16:30 16:30 16:30-20:30 20:30 20:30-23:30 23:30 23:30-03:30 23 May 00 03:30 03:30-06:00 06:00 06:00-06:00 06:00-09:30 09:30 09:30-11:30 11:30 11:30-15:00 15:00 15:00-17:30 17:30 17:30-21:00 21:00 21:00-23:00 23:00 23:00-05:30 24 May O0 05:30 Duration lhr 2-1/2 hr 2-1/2 hr 1 hr 3-1/2 hr 4 hr 3hr 4 hr 2-1/2 hr 24 hr 3-1/2 hr 2 hr 3-1/2 hr 2-1/2 hr 3-1/2 hr 2hr 6-1/2 hr Activity Serviced Block line cut & slip drlg. line. Equipment work completed R.I.H. to 9700.0 ft Stopped: To service drilling equipment Cleared Flowline clean out flow line Equipment work completed R.I.H. to 10500.0 ft Observed 15.00 klb resistance Washed to 11110.0 ft Circ & wash dn F/11048 to 11110.0 Stopped: To service drilling equipment Cleared Flowline take flow line apart & clean of debri (NOTE: thought at first to be clays due to not running enough water. ) Equipment work completed Washed to 11113.0 ft wash F/11110.00 to 11146.00 Stopped: To service drilling equipment Cleared Flowline flow line plugged take apart & clean out. & condition mud. Equipment work completed Washed to 11177.0 ft circ. & wash dn slowly to 11177.00 conditioning mud. Stopped: To hold safety meeting BHA run no. 8 (cont...) Circulated at 11141.0 ft hook up flow line bypass & close bag & circulate 450 bbl. @ 2-bpm & increase to 4-bpm Stopped: Flowline plugged Cleared Flowline Equipment work completed Washed to 11265.0 ft rotate & wash F/11141' to 11265' Flowline plugging Stopped: Flowline plugged Serviced Flowline Equipment work completed Washed to 11303.0 ft continue to wash & rotate F/11265' to 11303' (4es kb) Stopped: To circulate Circulated at 11303.0 ft Recip & Rotate & Circ bottoms up @ 3.5 BPM w/1700 psi. & Mix hi vis Sweep Hole swept with slug - 125.00 % hole volume Washed to 11303.0 ft Make short trips back in to csg. & wash & ream back to 11303' have a few fight spots to work & pump sweeps (lots of shale coming coming back) Stopped: To circulate Progress Report Facility M Pt F Pad Well MPF-84A Page 6 Rig Nabors 4ES Date 30 May 00 Date/Time 05:30-06:00 06:00 06:00-13:30 06:00-12:00 12:00 12:00-13:30 13:30 13:30-01:00 13:30-20:00 20:00 20:00-01:00 25 May 00 01:00 01:00-06:00 01:00-04:00 04:00 04:00-06:00 06:00 06:00-20:00 06:00-20:00 20:00 20:00-21:00 20:00-21:00 21:00 21:00-06:00 21:00-22:00 22:00 22:00-01:00 26 May 00 01:00 01:00-06:00 06:00 Duration 1/2 hr 7-1/2 hr 6hr 1-1/2 hr 11-1/2 hr 6-1/2 hr 5hr 5hr 3 hr 2hr 14 hr 14 hr lhr lhr 9hr lhr 3hr 5hr Activity Circulated at 11303.0 ft Pumping weighted pill to spot in open hole & dry Job. to pooh for plug. setting. Stopped · To hold safety meeting :-~ ......... ~ ~ ~.~ BHA run no. 8 (cont...) Pulled out of hole to 0.0 ft ; ..., c, ~, ~ ~ ..... Pooh & lay dn BHA # 8 Stopped · To pick upflay out tubulars Serviced BOP stack Pick up kelly & extension with holes inside & wash metal out of bop stack. Equipment work completed BHA run no. 9 R.I.H. to 11272.0 fl Mu bha # 9 16-jts. 2-3/8" tbg. & rih & tag 11242' 4es kb bottom of csg & wash to 11272' well bore packing off & sticking tools, pulling free with 40 k over. Unable to re-enter hole Pulled out of hole to 0.0 ft pooh & lay dn 16-jts. of 2-3/8" stinger. Stopped: To pick up/lay out tubulars BHA run no. 10 R.I.H. to 11135.0 ft make up mule shoe on 3.5" dp & rih to 11135' & tag fill Observed 25.00 klb resistance Washed to 11190.0 ft kelly up & begin washing dn will not go dn with out rotary, getting shale heavy over shaker Stopped: To circulate BHA run no. 10 (cont...) Washed to 11300.0 ft Wash & work F/11190' to 11300' & pump sweeps High vis & low vis & weighted while doing this & continus rotation & working when on bottom & clean shale out. On bottom Cement: Kickoff plug Mixed and pumped slurry - 25.000 bbl Mix & pump & put in place 20-bbl. 3 % kcl water+25 bbl. cl. G. 17.0 ppg. + 5-H20 & displace with 63-bbl. mud. Cement pumped Pull Drillpipe, 3-1/2in O.D. Pulled Drillpipe in stands to 10820.0 ft Completed operations Reverse circulated at 10820.0 ft Reverse circ two drillpipe volumes & rec. approximately 5-8 bbl. cmt. & continue to displace mud out of well bore with seah20 Hole displaced with Seawater - 125.00 % displaced Laid down 6138.0 ft of 3-1/2in OD drill pipe Stopped: To hold safety meeting Facility M Pt F Pad Progress Report Well MPF-84A Page 7 Rig Nabors 4ES Date 30 May 00 Date/Time 06:00-13:30 06:00-09:00 09:00 09:00-10:30 10:30 10:30-11:30 11:30 11:30-13:30 13:30 13:30-14:00 13:30-14:00 14:00 14:00-14:30 14:00-14:30 14:30 14:30-17:30 14:30-17:30 17:30 17:30-06:00 17:30-20:00 20:00 20:00-21:00 21:00 Duration 7-1/2 hr 3hr 1-1/2 hr 1 hr 2 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 3hr 3 hr 12-1/2 hr 2-1/2 hr 1 hr Activity Pull Drillpipe, 3-1/2in O.D. (cont...) Laid down 8820.0 ft of 3-1/2in OD drill pipe Stopped: To circulate Tested Other sub-surface equipment - Via annulus and string Pressure test csg. to 3500 & psi. bleed back to 2700 psi. & hold psi. for 30-min and stable Test witnessed by Lew Grimaldi with AOGC & Passed by Steve Shultz with SSD Pressure test completed successfully - 2700.000 psi Circulated at 2000.0 ft Freeze Protect well with diesel to 2000 feet. Hole displaced with Diesel - 100.00 % displaced Laid down 2000.0 ft of 3-1/2in OD drill pipe 64 joints laid out Wellhead work Removed Wear bushing Equipment work completed Wellhead work Installed Tubing hanger Equipment work completed Nipple down BOP stack Removed BOP stack Equipment work completed Wellhead work Installed Xmas tree Nipple up adapter & tree. & test same to 5000 psi. Equipment work completed Installed Hanger plug Pull twc & set bpv. & clean cellar area Equipment work completed Re: Change in program for F-84i DecomplelJo, 'ES) . , Subject: Re: Change in program for F-84i Decompletion (4ES) Date: Thu, 04 May 2000 16"15:21 -0800 From: Tom Maunder <tom_maunder@admin.state.ak. us> To: "Shultz, Steve M (ARCO)" <ShultzSM@BP.com> Steve, Your message will suffice. What you propose changes the procedure you sent in with the sundry. Using either method (bridge plug or long 0ement plug) the abandonment of the lower wellbore will be accomplished. Main thing we need is a heads up that things are being changed. Thanks for the question and notice. Tom "Shultz, Steve M (ARCO)" wrote: Do we need anything from AOGCC in writting that this is acceptable. Thanks Steve From: Tom Maunder[SMTP:torn_maunder@admin. state, ak. us] Sent: Thursday, May 04, 2000 3:'!5 PM To: Shultz Steve M (ARCO) Subject: Re: Change in programfor F-84i Decompletion (4ES) <<File: tom maunder, vcf>> -- Steve, Thanks for the note... I agree that there islikely to be metal there. Your plan sounds good. Good luck. Tom "Shultz, Steve M (ARCO)" wrote: > Tom, > Bob Laule and myself have been discussing the F-84i decompletion portion of > the program that carls for a bridge plug to be sat at 'll,350'prior to > setting a cement plug. We were finding that with afl of the metal that will > be milled there might be the strong possibility that getting a bridgeplug > down into the 4 1/2" liner may prove difficult without a scraper run. > Therefore, vve would like to opt for not running the bridge plug prior to > milling the casing and instead run in with open-ended tubing after milling > operations are completed and then set a continuous kickoffplug from the 4 > 1/2" landing collar at 11,502' back to +/-11,050' which wouldplace the top > of the cement plug 200 feet up inside of the 7" intermediate casing. > Thanks > Steve ~ ..¢ o 5/5/00 8:30 AM Re: F-84Ai Subject: Re: F-84Ai Date: Thu, 20 Apr 2000 15:36:34 -0800 From: Tom Maunder <tom_maunder@admin.state.ak. us> To: "Shultz, Steve M (ARCO)" <ShultzSM@BP.com> Thanks Steve, I will be "verbally" approving the sundry and faxing it over shortly. As we discussed, the casing test after placing cement over the shoe now becomes a key operation. Good luck. Tom "Shultz. Steve M (ARCO)" wrote: As we spoke of earlier, the tubing in F-84i ~tes inadvertently cut yesterday prior to approval of the Sundry from AOGCC. We have taken steps to see that this does not happen again and request approval on this sundry so that further predrill preparations can be initiated. Thankyou Steve Shultz Ops Engineer for Milne Point 564-5491 TOmpetroleumMaunderEngineer<tOm ma u nderC, ad m in.state.ak, us> Alaska Oil and Gas Conservation Commission 5/5/00 8:38 AM ii i i MPU F-84i ~ FMC 11' x 7-1/16' SM, , ..... Orig. GL Elev. = 11.90' ~ w/~x 3~' ~C~.~. RTTo~.~=(N27E) ~ 3~ eue ~ ~ ~ b~ 20' 91.1 ppf, H~0 ,,. KOP ~ ~ to 4A~' ) 9 ~' ~w~ 'ES' Ho~on~l s~. 11,~'-1~36' 9 ~8', ~/47 ppf, L~0 B~. I 5,~, ~ 4,1~'-5,~' / 47~4,18~- ~' ~ 29 ~f, L~0, Hydfill 5~ ~ing ( d~ ID = 6.184', ~. = 0.0371 bpf ) 3.5' 9.3 ppf, L~0 NSCT tubing (~. = 0.~87 bpf, drift = 2.867') Two 7' x 20' sho~ joints at 10,613' to 10,653' ~ 7' I~at sh~ Ref log: CD~GST/IMP 11/21/98 Size ~.[ ~"~'~ ~) .... I" I 2-7/8' 4 11,298'-11,500' 6903'~,950' 15.2 gm Tubing conveyed (0.29' EHD, '~~ ~ [ 4'5' 12'6 POf;~E'60' BTC ' M~ Liner ~P = 20.57") 34J UJ RDX charges ~ 60 ;~ ~i ( drift ID = 3.958', ~p. = 0.0152 bp[ ) deg. phasing, [ ~ 4.5" landing Collar (PBTD) 11~502' md 4.5- lloat collar 4.5" float sh~ 11,550' md ,, . .. DATE REV. BY.. ~UM~TS MILNE POINT UNIT 1~11/98 MD© Cased hole & ESP ~mpletion 27E WELL No.: F-84i 03~0/99 M~ ~nveH Producer into a inj~tor 4es APl ' 50-029-22931 04118/00 SMS Prep for Sidetrack with 4ES .... BP EXPLORATION (AK) __ ~-- 3/29/99 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 Al'tN: Sherrie NO. 12474 Company Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Milne Point (Cased Hole) Well Job # Log Description Date BL Sepia LIS Tape MPF-84 ukt ~ CMT 990320 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center Anchorage, Alaska 995 Date Delivered: Alar~ka Oil & Gas ~,"i;o~s, Commis~iort Schlumberger GeoQuest 3940 Arctic Blvd Anchorage, AK 99,503 AlaN: Sherrie~ 4/15/99 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 ATTN: Sherrie NO. 12514 Company Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Milne Point (Cased Hole) Color Well Job # Log Description Date Print Sepia LIS Tape MPF-84 99163 CEMENT MAPPING TOOL 990318 1 · PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 (..,c. IVED Date Delivered: ~"~"~ 2 Y 1999 Alaska Oil & Gas Colin. Commission Schlumberger GeoQuest 3940 Arctic Blvd Anchorage, (AK' 99~ ........................... ATfN: Sherri~ "- / . /"~ Receive~. , STATE OF ALASKA ALASK/-=_~.__~IL AND GAS CONSERVATION COMi~,-'~,$SION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface ./ / 2040' NSL, 2976' WEL, SEC. 06, T13N, R10E, UM At top of productive interval 2973' NSL, 303' WEL, SEC. 02, T13N, R09E, UM At effective depth 3119' NSL, 433' WEL, SEC. 2, T13N, R9E, UM At total depth 3630' NSL, 958' WEL, SEC. 02, T13N, R09E, UM 5. Type of well: [] Development [] ExploratOry [] Stratigrap~c [] Service ~ 6. Datum Elevation (DF or KB) KBE = 44.08' 7. Unit or Property Name Milne Point Unit 8. Well Number MPF-84 9. Permit Number 198-226 / 10. APl Number 50- 029-22931-00 11. Field and Pool Milne Point Unit / Kuparuk River Sands 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner 12236 feet ~'/ 6956 feet ~'' 11502 feet 6951 feet Length Size 112' 20" 5797' 9-5/8" Plugs (measured) Junk (measured) Cemented 250 sx Arcticset I (Approx.) 1300 SX PF 'E'. 330 sx 'G'. 170 11219' 7" 165 sx Class 'G' 438' 4-1/2" 80 sx Class 'G' MD 'f'VD 112' 112' 5833' 4286' 11252' 6872' 11112'-11550' 6800'-6957' Perforation depth: measured true vertical 11298'-11500' 6893'-6950' ORIGINAL Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80, NSCT to 11119' Packers and SSSV (type and measured depth) 7" Baker S-3 packer at 11091' RECEIVED /?R 20 2000 ~ask~. Oil & Gas Cons, Commissio~ ~0rag..e 13. Attachments [] Description Summary of Proposal 4. Estimated date for commencing operation I15. May 1,2000 16. If proposal was verbally approved ~, ..... [ · _ Name of ap proverx~J--~C~'~-(,. Date Approved Contact Engineer Name/Number: Steve Shultz, 564-5491 [] Detailed Operations Program [] BOP Sketch Status of well classifications as: []Oil []Gas []Suspended Service Water & Gas Injector Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that th,~ fore~oi, jj3,g is trpc,~d correct to the best of my knowledge . / _ Signed Chuck MallaryC*'/~'~f" ~ Title Senior Drilling Engineer Date z./, / Conditions of Approval: Notify Commission so representative may witness Approval No. oo, Plug integrity ',~ BOP Test '.~. Location clearance __ I Mechanical IntegritY/Test __ Subsequent form required 10- ~pproved Copy Approved by order of the Commission ORIGINAL SIGNED-BY .R~+,,,..,3eci Commissioner Date Form 10-403 Rev. 06/15/88 Robert N Onns[enson ..~..~:~-~.~ Submit In Triplicate To' Blair Wonzell-AOGCC Date: April 18, 2000 From: Steve Shultz Subject: MPU-84Ai Application for Sundry Permit - P&A for Sidetrack Operations References: API #50-029-22931 Well MPF-84Ai is presently an injection well that has been shut in. The well was drilled in December of 1998. The Kuparuk was top set and upon drilling the horizontal section the well developed problems when a fault was encountered and hole conditions would not allow the well to be drilled to TD. Approximately 300 feet of the section was saved and a production liner was then set and cemented in place. Upon completion the well was placed on production and disappointing production rates were observed which led to the conversion of MPF-84 to an injector (MPF-84i). The well's injection rates initially were more then adequate but upon shutting the well in for diagnostic tests and then starting injection again, it was found that the well no longer would take water. The well is presently planned for a horizontal sidetrac'[-to a n"~w b~tom~ole'[ocation. Nabors 4ES is slated to do the work which should initiate around May 1st. Pre-Rig Work: *Notify the field AOGCC representative with intent to plan and abandon. 1. Pressure test annulus to 3000 psi to pressure test 7" casing for integrity 2. RU E-line. Cut 3 V2" L-80 tubing at +11,040' 3. Displace the well to clean seawater by circulating down the tubing through the tubing cut. Circulate until clean seawater returns to surface. Freeze protect top 2200' MD with diesel. 4. Test wellhead packoff to 5000 psi for 30 minutes 5. Bleed annulus and tubing to 0 psi pressure. Secure well. 6. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation cost on the handover form. Rig Operations: RECEIVED 1. MIRU Nabors 4ES, ND tree and NUB OPE '" 2 0 2000 2. Circulate out freeze protection and displace well to seawater 3. Pull 3 V2" L-80 tubing and LD same Ata~ka0~l & Gas Cons. Commi~ion 4. MU packer mill and mill out packer at 11,090', retrieve same Anehor~e 5. RU wireline and RIH with 4 lA" bridge plug and set in 4 V2" production liner at 11,350' 6. MU mill and milling BHA and RIH 7. Mill up the liner hanger at 11,112' and continue milling up the 4 V2" liner to +11,300' RIH with openended tubing and lay and cement abandonment/kickoff plug from +11,300' to 11,150' (17.0 ppg densified plug) 8. LD work string, pressure test casing to 1500 psi 9. RIH with 2200 feet of 3 ½" tubing and freeze protect with diesel 10. Install back pressure valve 11. RDMO Nabors 4ES Estimated Pre-rig Start Date: Estimated Spud Date: Steve Shultz Ops Drilling Engineer 564-5491 05/01/00 06/01/00 RECEIVED APR 20 ~000 Alaska Oil & Gas Cons. Cornrni~on Anchorage RECEIVED .. ': APR 2_0 2000 Alaska 0ii & Gas Cons. rso~m~s~o~ Anchorage Tree: Cameron 3 1/8", 5M MPU F'84i Orig' DF Elev' = 44'08' (N 27E) Wellhead: FMC 11" x 7-1/16" SM, ~ ~ Orig. GL Elev. = 11.90' Gen. 5a w/6"x 3.5"FMCTbg. Hnr. ~~ii~ KOP @ 400 to 4,200' i i- ~ I ) 9 5/8" Howco 'ES' Max. hole angle = 90 deg. ~ ! Cementer 60 - 64 deg. 4,300' - 11,300' ~ 2111' md Hole angle thru' perfs = 91 deg. i ' I~"1 3.5" HES X-Nipple ( 2.813" id)I 2,222' Horizontal sec. 11,300'-12,236' ~; ,1 9 5/8", 40/47 ppf, L-80 Btrc. I 5,833' 40# 4,186'-5,833' / 47#4,186'- 35' [i ~ 7" 29 ppf, L-80, Hydrill 563 casing i ~ ( drift ID: 6.184", cap.: 0.0371 bpf) i:ii , [: ! Tubing: 2200' methanol + source h2o. 3.5" 9.3 ppf, L-80 NSCT tubing ', ,..-*..~ ~ Annulus: 2000' diesel + sea water. (cap. = 0.0087 bpi, drift = 2.867") ' ~.i~ 3.5" HES X-Nipple ( 2.813" id ) 111,o41'1 I~1 ~: ~ 9.84' pup Two 7" x 20' short joints at ,~ ~ 10,613' to 10,653' md ~i ~ 31.5' pup (58 degrees) ~ ~, 6.10' pup 1 7'x 3.5" Baker S-3 Perm. pkr. I 11,090' , 3.5" HES XN-Nipple I 1 1, 1 05' 2.813"pkg. bore / 2.750" min. id I ~ ~ Baker"HMO"hyd. Linerhng. ,11,112'~ j ~. 7"fl°atc°llar 111,166'I 7" float shoe 11,252' Perforation Summary ~ Ref log: CDR/GST/IMP 11/21/98 Size spf Interval (TVD) 4.5" 12.6 ppf, L-80, BTC - Mod Liner 2-7/8 4 11,298'-11,500' 6,903'-6,950' ( drift ID = 3.958", cap. = 0.0152 bpf ) 15.2 gm Tubing conveyed (0.29" EHD, ~ deg. phasing, 4.5" Landing Collar (PBTD) 11,502' md ,~~~, 4.5" float collar 11,524' md 4.5" float shoe 11,550' md DATE REV. BY COMMENTS MILNE POINT UNIT 12/11/98 MDO Cased hole & ESP completion 27E WELL No.: F-84 03/20/99 MDO Convert Producer into a injector 4es APl ' 50-029-22931 BP EXPLORATION Tree; Cameron31/8", 5M MPU F'84i Orig. DFElev.= 44.08' (N 27E) W¢lhe~d; FMC 11" x 7-1/16" 5M, Orig. GL Elev. = 11.90' Gen. 5a w/6" x 3.5" FMC Tbg. Hnr. I RT To Tb.q. Spool = ('N 27E) w/3.5' eue threads top and btm. 3" CIW H BPV profile I ) 9 5/8" Howco 'ES' KOP @ 400 to 4,200' ' Cementer Max. hole angle = 90 deg. 1 21'11' I md i60- 64 deg. 4,300' - 11,300' I I Hole angle thru' perfs = 91 deg. Horizontal sec. 11,300'-12,236' 9 5/8", 40 / 47 ppf, L-80 Btrc. I 5,833' ~ 40# 4,186'-5,833' / 47#4,186'- 35' 7" 29 ppf, L-80, Hydrill 563 casing ( drift ID = 6.184", cap. = 0.0371 bpf ) 3.5" 9.3 ppf, L-80 NSCT tubing (cap. = 0.0087 bpf, drift = 2.867") i Two 7"x 20' short joints at 10,613' to 10,653' md ii / ,~ ~, 7"fl°ate°liar 111,166'I 7" float shoe 11,252' (60 degrees) Perforation Summary, Ref log: CDR/GST/IMP 11/21/98 Size spf Interval (TVD) I+/-11,300' 2-7/8 41 ,298'-11,500' 6.903'-6,950' L, ------i _=___-- 4.5" 12.6 ppf, L-80, BTC - Mod Liner 15.2 gm Tubing conveyed (0.29" EHD,__-- --=--- _--== ( drift ID = 3.958", cap. = 0.0152 bpf ) -[-Fp = 20.57") 34J UJ RDX charges @ 60 ~ ==- deg. phasing, 4.5" Landing Collar (PBTD) 11 ~502' md ~lillJilll~l~ ~ 4.5" float collar 11,524' md 4.5" float shoe 11,550' md DATE REV. BY COMMENTS MILNE POINT UNIT 12/11/98 MDO Cased hole & ESP completion 27E WELL No,: F-84i 03/20/99 MDO Convert Producer into a injector 4es APl · 50-029-22931 04/18/00 SMS Prep for Sidetrack with 4ES BP EXPLORATION IAK) RECEIVED APR 20 2000 !a,~ka Oil & Gas Cons. Oommis~iot; Anchor~e F~84Ai Subject: F-84Ai Date: Thu, 20 Apr 2000 18:06:31 -0500 From: "Shultz, Steve M (ARCO)" <ShultzSM@BP.com> To: "'tom_maunder@admin.state.ak. us'" <tom_maunder@admin.state.ak. us> Tom, As we spoke of earlier, the tubing in F-84i was inadvertently cut yesterday prior to approval of the Sundry from AOGCC. We have taken steps to see that this does not happen again and request approval on this sundry so that further predrill preparations can be initiated. Thankyou Steve Shultz Ops Engineer for Milne Point 564-5491 1 of 1 4/20/00 3:34 PM MPU F-84i status Subject: MPU F-84i status Date: Sun, 2 May 1999 22:04:52 -0400 From: "MPU, OI Compliance Advisor" <MPUOIComplianceAdvisor@BP.com> To: "'blair wondzell~admin.state.ak.us'" <blair wondzell~admin.state.ak.us> CC: "MPU, Well Operations Supervisor" <welloperationssupervisor~BP.com>, "MPU, Wells Ops Coord" <MPUWellsOpsCoord@BP.com>, "MPU, Field Lead Tech" <MPUFieldLeadTech~BP.com>, "Hill, Charles W" <HillCW@BP.com>, "Sorrentino, Angela M" <SorrenAM@BP.com> Blair, Just following up to our conversation about F-84i last week. As I suspected, the tree pack-off had already been tested (OK). The well is shut in with gauges hanging in the lower profile for two weeks while we perform a pressure fall-off test. If the fall-off test concludes that the well is a necessary and valuable injector, we will set a plug and perform a pressure test of the packer and 7" casing along with an inspector (if available). If the test demonstrates 7" integrity, we will then submit an application (10-403) for approval to continue injection at the discretion of the agency. F-84i presently has a "Do Not Operate" tag on the master valve and is not to be injected into without verbal or written approval from your office. If there is a more appropriate way to approach this situation, please advise us. Thanks for your time. Larry Niles MPU OI Compliance Advisor MPU IMT Coordinator E-mail: nilesle@bp.com Office/Room: (907) 659-6367 Fax: (907) 659-6390 Home: (907) 232-1336 1 of 1 5/3/99 8:22 AM STATE OF ALASKA ALASKA ,~-.~_ AND GAS CONSERVATION COM~ilSSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: I--I Operation Shutdown []Stimulate [] Plugging [] Perforate [] Pull Tubing I--IAIter Casing [-~ Repair Well [~ Other Change to Injector 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2040' NSL, 2976' WEL, SEC. 6, T13N, R10E, UM At top of productive interval 2973' NSL, 303' WEL, SEC. 2, T13N, R9E, UM At effective depth 3119' NSL, 433' WEL, SEC. 2, T13N, R9E, UM At total depth 3630' NSL, 958' WEL, SEC. 2, T13N, R9E, UM 5. Type of well: [] Development I--~ Exploratory [] Stratigraphic [~ Service 6. Datum Elevation (DF or KB) KBE = 44.08' 7. Unit or Property Name Milne Point Unit 8. Well Number MPF-84 9. Permit Number / Approval No. 98-226 399-033 10. APl Number 50-029-22931-00 11. Field and Pool Milne Point Unit / Kuparuk River Sands 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing 12236 feet Plugs (measured) 6956 feet 11502 feet Junk (measured) 6951 feet Length Size Cemented Structural Conductor 112' 20" 250 sx Arcticset I (Approx.) Surface 5797' 9-5/8" 1300 sx PF 'E', 330 sx 'G', 170 sx PF 'C' Intermediate Production 11219' 7" 165 sx Class 'G' Liner 438' 4-1/2" 80 sx Class 'G' MD TVD 112' 112' 5833' 4286' 11252' 6872' 11112'-11550' 6800'-6957' Perforation depth: measured 11298' - 11500' true vertical 6893' - 6950' Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80, NSCTto 11119' Packers and SSSV (type and measured depth) 7" Baker S-3 packer at 11091' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 0RI61NAL 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 5. Attachments [] Copies of Logs and Surveys run [] Daily Report of Well Operations 7. I hereby certify that the f~going is trio the best of my knowledge Signed Terrie Hubble w Title Technical Assistant III Prepared By Name/Number: I16. Status of well classifications as: [] Oil [] Gas [] Suspended Service Water & Gas Injector Date Terrie Hubble, 564-4628 Form 10-404 Rev. 06/15/88 Submit In Duplicate Facility Date/Time 16 Mar 99 17 Mar 99 18 Mar 99 19 Mar 99 20 Mar 99 Progress Report M Pt F Pad Well MPF-84 Page 1 Rig Nabors 4ES Date 14 April 99 18:00-04:00 04:00-06:00 06:00-08:00 08:00-08:30 08:30-09:30 09:30-12:30 12:30-13:30 13:30-15:30 15:30-18:00 18:00-20:00 20:00-21:00 21:00-06:00 06:00-08:00 08:00-16:00 16:00-21:00 21:00-06:00 06:00-06:30 06:30-07:30 07:30-12:00 12:00-17:00 17:00-18:00 18:00-20:30 20:30-02:30 02:30-04:00 04:00-05:30 05:30-06:00 06:00-07:00 07:00-09:30 09:30-10:00 10:00-12:30 12:30-17:00 17:00-19:00 19:00-20:00 20:00-21:00 Duration 10hr 2 hr 2 hr 1/2 hr 1 hr 3hr 1 hr 2 hr 2-1/2 hr 2 hr 1 hr 9 hr 2hr 8 hr 5 hr 9 hr 1/2 hr 1 hr 4-1/2 hr 5 hr 1 hr 2-1/2 hr 6 hr 1-1/2 hr 1-1/2 hr 1/2 hr 1 hr 2-1/2 hr 1/2 hr 2-1/2 hr 4-1/2 hr 2 hr 1 hr lhr Activity Rig moved 100.00 % Rigged up Fluid system Fill pits with Fresh water Removed Hanger plug Tested High pressure lines Circulated closed in well at 11000.0 ft Removed Xmas tree Rigged up BOP stack Tested BOP stack Removed Hanger plug Removed Tubing hanger Laid down 11000.0 ft of Tubing Rigged down sub-surface equipment - ESP Conducted slickline operations on Slickline equipment - Retrival run Conducted electric cable operations Ran Tubing to 11112.0 ft (3-1/2in OD) Ran Tubing to 11120.0 ft (3-1/2in OD) Serviced Block line Pulled Tubing in stands to 0.0 ft Ran Tubing in stands to 9625.0 ft Pulled Tubing in stands to 8967.0 ft Conducted slickline operations on Slickline equipment - Retrival run Conducted electric cable operations Ran Tubing in stands to 11118.0 ft Installed Tubing hanger Removed BOP stack Removed BOP stack Installed Xmas tree Retrieved BOP test plug assembly Freeze protect well - 75.000 bbl of Diesel Conducted slickline operations on Slickline equipment - Setting run Tested Tubing - Via string Tested Permanent packer - Via annulus Rigged down High pressure lines MEMORANDUM TO: State of Alaska Alaska Oil and Gas Conservation Commission / Robert Christenson~ DATE: March 17,1999 Chairman THRU: Blair Wondzell, P. I. Supervisor FROM: Lawrence M Wad~{~ SUBJECT: Petroleum Inspector FILE NO: akqgcqfg. DOC BOP Test Nabors 4S Milne Pt F-84i PTD 98-226 March 17,1999: I traveled to Milne Pt to witness a BOP test on Nabors 4S. This rig is working an approximate 2 on and 2 off schedule doing workovers and having a warm watch on their days off. The rig looks orderly but during the test we had trouble with the pop-off valve on the test pump. We also had the air driven koomey pump fail during the accumulator test. The koomey pump will be fixed before they pull tubing on the well. ,SUMMARY: Witness a BOP test on Nabors 4S, 1 failure, 3 hours. Attachments: akqcqfg.xls cc; NON-CONFIDENTIAL STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: Workover: X Drlg Contractor: Nabors Operator: BPX Well Name: F-$4i Casing Size: 4 1/2" Set @ Test: Initial X Weekly Rig No. 4S PTD# Rep.: Rig Rep.: 11,550 Location: Sec. Other DATE: March 17,1999 98-226 Rig Ph.# Larry Myers Gene Sweatt 2 T. 13N R. gE Meddian Umiat Test Pressures 250/3000 Test MISC. INSPECTIONS: Location Gen.: ok Housekeeping: ok (Gert) PTD On Location n/a Standing Order Posted X Well Sign X Drl. Rig X Hazard Sec. X FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Quan. Pressure P/F 250/3000 250/3000 250/3000 250/3000 BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. I 250/3000 1 250/3000 250/3000 1 250/3000 I 250/3000 2 250/3000 1 250/3000 P/F P P P P P P n/a MUD SYSTEM: Visual Alarm Trip Tank X X =it Level Indicators X X Flow Indicator X X Meth Gas Detector X X H2S Gas Detector X X CHOKE MANIFOLD: No. Valves 11 No. Flanges 22 Manual Chokes 1 Hydraulic Chokes 1 Test Pressure 250/3000 250/3000 Functioned Functioned P/F P P P ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: 17oo 3,000 1,800 minutes 33 sec. minutes 0 sec. X Remote: X Psig. Number of Failures: I ,Test Time: 3.0 Hours. Number of valves tested 15 Repair or Replacement of Failed Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 if your call is not returned by the inspector within 12 hours please contact the P. !. Supervisor at 279-1433 REMARKS: Air driven Koomey pump failed. Will be repaired before they pull tubing. Distribution: odg-Well File c - Oper./Rig c- Database c - Tdp Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: Larry Wade F1-021L (Rev. 12/94) akqgcqfg.xls OPER~TOR~I STATE OF ALASKA AI.A~ O11. AND GAS CONSERVATION COMMISSION lz,~m,.ai,~ ~ Te~ pf:;'¢'. ~?~ ,,:u:, , ,.,,,,.,- , ,.,,,:,: ??? F--' ?..~ / ,:,,,~:' z'-2$-?q r C.O~MENT,S: 'COMMENTS: COMMENTS: ! I I I t ,, / TBG. I1~. FLUID CODES F = FRESH WATER IN J, G = GA8 INJ. $ = SALT WATER INJ. N = NOT' INJECTING D~'ri~ orig - W~ File c-~ c - Data_4.s-e__ c - Trip RIX File TEST TYPE: M = ANNULUS IVtONffOF~NG P = GIrD ANNULUS PRESSUI~ R = INTERNAL RAD. TRACER SURVEY ^ = TEMPERATURE ANOMALY TEST D = DIFFERENTIAL T~'fURE MiTFRM1 ANNULAR RI, lID: DIESEL GLYCOL SALT WATER DRtLIJNG MUD OTHER ~r ' ~'! o. oo 0.00 0.00 , AOGCC REP 81GNATURE:~J/-~ t/.}~ Y ~ _ _ 4- Y~r INorbver Other (Rev 9/17/96) MNR lb 'WW 1W:2~HM ~M MILML ~UI~I ~UU~ ~.~ II I I ~ II1 Tmg:~-l/8"- 5M FMC Proposed MPU F-84i or;g. Wellhe~ 11" SM FMC ~n, 5 ~. -- ~. Orig, GL ~lav, ~ t 1.~ w/ 11"x~,~".FMO~g. Hng. ~ -- ~ ,I RTTO~,~ooI~(N~E) 20" '91.1 ,pr, H-a0 ~~ ~ ' KOP ~ ~0 to 4,~Off . Hole a~le ~ru' ~ed$ ~ 91 ~. ~ ~ ~ S/e" H~ 'ES' , 40a 4,186'.~,8~' / ~7~4,186'- ~' . I ( dri~ ID = B. 1M, cap.. 0,0371 b~ ) , ~. 9.2 P~, ~s light ~bing ~ · . ~"' · ..,, . eaker I0,&13' I~ 10,~3' ~d~..~ ......... · _ ' Baker "HMC" hyd, Uner i " i~ 15,2 gm Tubing conv~ed (0.~" EHD, '~' ~P. ~0.57') ~ UJ RDX ehar~s ~ 60 -.~ deg. ~h~ln~, '~ T 4,5~ ~nding Collar (PB~) 11,$02' md 4.~" floal shoe 11 ~0' md _ ~_., . DATE REV, aY ....... CO~ .MILNE POl~ UNiT 1~11/~a -MOO Cased ~ole &.~SP ~mplat;~ 27E - - WELL NO,: F~4i l/2~gg TC Pmpo;ed Come.Ion to I~e~ion · . · . :.~. ~. - ...... .. _ . , BP EXPLORATION ~AK)_ III RECEIVED MAR 1 5 !999 G~s Cons. Commission Anchorage STATE OF ALASKA ALASKA O~AND GAS CONSERVATION COMi~SSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Change to Injector 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 t5. Type of well: [] Development I--I Exploratory [] Stratigraphic [-~ Service 4. Location of well at surface 2040' NSL, 2976' WEL, SEC. 6, T13N, R10E, UM At top of productive interval 2973' NSL, 303' WEL, SEC. 2, T13N, R9E, UM At effective depth 3119' NSL, 433' WEL, SEC. 2, T13N, R9E, UM At total depth 3630' NSL, 958' WEL, SEC. 2, T13N, R9E, UM 6. Datum Elevation (DF or KB) KBE = 44.08' 7. Unit or Property Name Milne Point Unit 8. Well Number MPF-84 9. Permit Number 98-226 10. APl Number 50-029-22931-00 11. Field and Pool Milne Point Unit / Kuparuk River Sands 12. Present well condition summary Total depth: measured 12236 feet true vertical 6956 feet Effective depth: measured 11502 feet true vertical 6951 feet Casing Length Size Structural Conductor 112' 20" Surface 5797' 9-5/8" Intermediate Production 11219' 7" Liner 438' 4-1/2" Plugs (measured) Junk (measured) Cemented MD TVD 250 sx Arcticset I (Approx,) 112' 112' 1300 sx PF 'E', 330 sx 'G', 170 sx PF 'C' 5833' 4286' 165 sx Class 'G' 11252' 6872' 80 sx Class 'G' 11112' - 11550' 6800' - 6957' Perforation depth: measured 11298'- 11500' 0 R true vertical 6893' - 6950' Tubing (size, grade, and measured depth) 2-7/8", 6.5#, L-80 to 11031 Packers and SSSV (type and measured depth) None GINAL 13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch 14. Estimated date for commencing operation March 15, 1999 16. If proposal was verbally approved Name of approver Contact Engineer Name/Number: Robert Laule, 564-5195 Date approved 15. Status of well classifications as: [] Oil [] Gas [] Suspended Service Prepared By NamelNumben Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Robert Laule ~ .--- Title Operations Drilling Engineer Commission Use Only Conditions of Approval: Notify Commission so representative may witness Date I Approval d. L Plug integrity BOP Test v,'" Location clearance Mechanical Integrity Test v'/' Subsequent form required 10- Approved by order of the Commission ,,,. tGINAL SIGNED-BY Form 10-403 Rev. 06/15/88 :~-tubert N, Chfist'enson Approved .Copy ~P,D/;r~oner Date 5"~-~ Submit In Triplicate Pre Rig Scope of work Conduct Amerada survey Set PBV Rig Scope of work This scope of work covers the conversion of MP F-84 from a producer to an injector. 1.) MIRU Work Over Rig 2.) Pull BPV. Kill well. Set TWC. ND Tree, NU BOP and test. 3.) Retrieve existing ESP completion. Follow NORM handling and inspection procedures. 4.) Run bond log and GR/JB. 5.) Run 3-1/2" packer completion. 6.) Freeze protect annulus. Set packer and test. Test to be witnessed by AOGCC. 7.) RDMO Work Over Rig. February 17, 1999 GeoQuest Schlumberger GeoQuest 3940 Arctic Boulevard Anchorage, Alaska 99503 (907) 273-1700 (907) 561-8317 (Fax) TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center MB3-3 900 E. Benson Bivd. Anchorage, Alaska 99519-6612 The following data of the MD CDR/GST/IMP & TVD for well MPF-84, Job # 99070 was sent to: BP Exploration (Alaska)Inc. Petrotechnical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, AK 99519-6612 E-TRANS- 2/16/99 3 Bluelines each 1 Film each State of Alaska Alaska Oil & Gas Conservation Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 1 OH LIS Tape 1 Blueline each 1 Sepia each OXY USA, Inc. Attn: Darlene Fairly P.O. Box 50250 Midland, TX 79710 t OH LIS Tape 1 Blueline each 1 Sepia each Sent Certified Mail: P 067 695 535 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd Anchorage Alaska~t~1 Date Delivered: Schlumberger GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 AI-rN'. Sherrie Received ~~~~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 98-226 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22931-00 4. Location of well at surface :~'"~.;:>' '%_1 : '~ .~ ': ~ ' '~ ~~ ~ 9' Unit or Lease Name 2040' NSL, 2976' WEL, SEC. 6, T13N, R10E, UM i --".'~--~ ! &:'-: Milne Point Unit · ' :; " :r 10. Well Number At top of productive interval 2973' NSL, 303' WEL, SEC. 2, T13N, R9E, UMAt total depth '~ ~i:~ !i. ii' ,~~~:'-. ! M PF-84 3630' NSL, 958' WEL, SEC. 2, T13N, R9E, UM '~ ~: '-' ..... '::::'; 3! ! 11. Field and Pool Milne Point Unit / Kuparuk River 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Sands KBE = 44.08'I ADL 388235 12. Date Spudded 113. DateT. D. Reached I 14. Date Comp., Susp., or Aband.ll 5. Water depth, if offshore 16. No. of Completions 11/21/98I 12/5/98t 12/11/98I N/A MSL One 17. Total Depth (MD+TVD) I18. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 12236 6956 FTI 11502 6951 FTI []Yes [~]NoI N/A MDI 1800' (Approx.) 22. Type Electric or Other Logs Run MWD / LWD, Gyro 23. CASlNG~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO-FrOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.1# H-40 Surface 112' 24" 250 sx Arcticset I (Approx.) 9-5/8" 40#/47# L-80 36' 5833' 12-1/4" 1300 sx PF 'E', 330 sx 'G', 170 sx PF 'C' 7" 29# L-80 33' 11252' 8-1/2" 165 sx Class 'G' 4-1/2" 12.6# L-80 11112' 11550' 6" 80 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) 2-7/8" Gun Diameter, 4 spf 2-7/8", 6.5#, L-80 11031' N/A MD TVD MD TVD 11298' - 11500' 6893' - 6950' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 63 Bbls~ Dead Crude .-I', ¢", :. '..,_, .... "~,~',1,,., "" 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) January 17, 1999 Flowing Date of Test Hours Tested TEsTPRODUCTIONpERIOD FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE GA 1~0/?//]7_./,.%%~ Flow Tubing Casing Pressure CALCULATED OIL-DEL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Top KC1 11198' 6875' Kuparuk A3 11281' 6886' KA3L 11298' 6893' Kuparuk A2 11341' 6910' Kuparuk A1 11372' 6920' Miluveach 11629' 6959' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that th.e fo~g. oingisr~j~ and correct to the best of my knowledge __ I Signed ~ ,/~,,.r~,q,~ Title Senior Drilling Engineer Date Chuck Mallary MPF-84/-¢//~)~-226 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number \P~rmit No. / Approval NO. INSTRUCTIONS GENER,~L: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Performance Enquiry Report Operator BP Exploration Date 00:29, 11 Feb 99 Page 1 Formation Integrity Test for MPF-84 The analysis is from - 17:00, 25 Nov 98 - to - 17:00, 25 Nov 98 Programs in Result Table: MPF-84 Drill and Complete well Type Time From Time To Duration Description E.M.W.(equivalent mud weight) Depth MDR Hole Size MDR MPF-84 Event 17:00, 25 Nov 98 17:00, 25 Nov 98 0 hr 0 min Obtained required level of integrity 11.5 7260.0 8-1/2 Progress Report Facility M Pt F Pad Well MPF-84 Rig ~ ~k~-e~ ~'~' Page 1 Date 10 February 99 Date/Time 19 Nov 98 20 Nov 98 21 Nov 98 22 Nov 98 23 Nov 98 24 Nov 98 25 Nov 98 21:00-00:00 00:00-00:30 00:30-06:00 06:00-06:30 06:30-11:00 11:00-12:00 12:00-18:00 18:00-23:30 23:30-00:00 00:00-03:00 03:00-06:00 06:00-06:30 06:30-00:00 00:00-01:00 01:00-02:00 02:00-03:00 03:00-06:00 06:00-06:30 06:30-18:00 18:00-18:30 18:30-01:30 01:30-03:30 03:30-06:00 06:00-06:30 06:30-08:30 08:30-10:30 10:30-16:00 16:00-17:00 17:00-17:30 17:30-23:00 23:00-01:00 01:00-03:00 03:00-04:00 04:00-06:00 06:00-06:30 06:30-09:30 09:30-11:30 11:30-13:30 13:30-17:00 17:00-18:00 18:00-22:00 22:00-02:00 02:00-03:00 03:00-06:00 06:00-06:30 06:30-07:30 07:30-09:00 09:00-09:30 09:30-12:30 12:30-13:30 13:30-14:30 14:30-16:00 16:00-16:30 16:30-17:00 Duration 3 hr 1/2 hr 5-1/2 hr 1/2 hr 4-1/2 hr lhr 6 hr 5-1/2 hr 1/2 hr 3 hr 3 hr 1/2 hr 17-1/2 hr 1 hr 1 hr 1 hr 3 hr 1/2 hr 11-1/2 hr 1/2 hr 7 hr 2 hr 2-1/2 hr 1/2 hr 2 hr 2 hr 5-1/2 hr 1 hr 1/2 hr 5-1/2 hr 2hr 2 hr 1 hr 2 hr 1/2 hr 3 hr 2 hr 2 hr 3-1/2 hr 1 hr 4 hr 4 hr 1 hr 3 hr 1/2 hr 1 hr 1-1/2 hr 1/2 hr 3 hr 1 hr lhr 1-1/2 hr 1/2 hr 1/2 hr Activity Rigged down High pressure lines Held safety meeting Rig moved 25.00 % Held safety meeting Rig moved 100.00 % Held safety meeting Rigged up High pressure lines Rigged up Divertor Tested Divertor Made up BHA no. 1 Drilled to 310.0 ft Held safety meeting Drilled to 3015.0 ft Circulated at 3015.0 ft Pumped out of hole to 1500.0 ft R.I.H. to 3015.0 ft Drilled to 3485.0 ft Held safety meeting Drilled to 4983.0 ft Held safety meeting Drilled to 5850.0 ft Circulated at 5850.0 ft Pulled out of hole to 1200.0 ft Held safety meeting R.I.H. to 5850.0 ft Circulated at 5850.0 ft Pulled out of hole to 0.0 ft Rigged up Casing handling equipment Held safety meeting Ran Casing to 5833.0 ft (9-5/8in OD) Circulated at 5833.0 ft Mixed and pumped slurry - 245.000 bbl Circulated at 2110.0 ft Mixed and pumped slurry - 530.000 bbl Held safety meeting Serviced Casing handling equipment Rigged down Divertor Installed Casing head Rigged up BOP stack Installed BOP test plug assembly Repaired Pipe ram Tested BOP stack Installed Wear bushing Made up BHA no. 2 Held safety meeting R.I.H. to 2111.0 ft Drilled installed equipment - Cementing packer Tested Casing R.I.H. to 5750.0 ft Held drill (Kick (well kill)) Tested Casing Drilled installed equipment - Float shoe Circulated at 5770.0 ft Performed formation integrity test Progress Report Facility M Pt F Pad Well MPF-84 Rig (null) Page 2 Date 10 February 99 Date/Time 17:00-06:00 26 Nov 98 06:00-06:30 06:30-18:00 18:00-18:30 18:30-23:00 23:00-01:00 27 Nov 98 01:00-03:00 03:00-04:00 04:00-05:00 05:00-06:00 06:00-06:30 06:30-18:00 18:00-18:30 18:30-20:30 20:30-23:00 23:00-06:00 28 Nov 98 06:00-06:30 06:30-11:00 11:00-13:00 13:00-17:00 17:00-19:00 19:00-22:30 22:30-23:00 23:00-06:00 29 Nov 98 06:00-12:00 12:00-13:30 13:30-16:30 16:30-17:30 17:30-18:30 18:30-20:30 20:30-23:30 23:30-01:00 30 Nov 98 01:00-02:00 02:00-06:00 06:00-08:30 08:30-10:30 10:30-11:00 11:00-16:30 16:30-18:00 18:00-00:00 01 Dec 98 00:00-04:30 04:30-06:00 06:00-06:30 06:30-12:30 12:30-13:30 13:30-16:30 16:30-20:00 20:00-00:00 02 Dec 98 00:00-00:30 00:30-05:30 05:30-06:00 06:00-13:00 13:00-15:00 15:00-15:30 Duration 13 hr 1/2 hr 11-1/2 hr 1/2 hr 4-1/2 hr 2 hr 2 hr 1 hr 1 hr 1 hr 1/2 hr 11-1/2 hr 1/2 hr 2 hr 2-1/2 hr 7 hr 1/2 hr 4-1/2 hr 2 hr 4 hr 2 hr 3-1/2 hr 1/2 hr 7 hr 6 hr 1-1/2 hr 3hr 1 hr 1 hr 2 hr 3 hr 1-1/2 hr 1 hr 4 hr 2-1/2 hr 2 hr 1/2 hr 5-1/2 hr 1-1/2 hr 6 hr 4-1/2 hr 1-1/2 hr 1/2 hr 6 hr 1 hr 3hr 3-1/2 hr 4 hr 1/2 hr 5 hr 1/2 hr 7 hr 2 hr 1/2 hr Activity Drilled to 7260.0 ft Held safety meeting Drilled to 8575.0 ft Held safety meeting Drilled to 9043.0 ft Circulated at 9043.0 ft Pulled out of hole to 5800.0 ft R.I.H. to 9043.0 ft Circulated at 9043.0 ft Drilled to 9233.0 ft Held safety meeting Drilled to 10076.0 ft Held safety meeting Drilled to 10200.0 ft Circulated at 10200.0 ft Conducted electric cable operations Held safety meeting Pulled out of hole to 0.0 ft Made up BHA no. 3 R.I.H. to 10200.0 ft Circulated at 10200.0 ft Drilled to 10473.0 ft Serviced Top drive Drilled to 11038.0 ft Drilled to 11260.0 ft Circulated at 11260.0 ft Pulled out of hole to 5833.0 ft Serviced Block line Serviced Top drive R.I.H. to 11260.0 ft Circulated at 11260.0 ft Circulated at 11260.0 ft Pumped out of hole to 10379.0 ft Pulled out of hole to 5833.0 ft Pulled BHA Rigged up Casing handling equipment Held safety meeting Ran Casing to 5480.0 ft (7in OD) Circulated at 5480.0 ft Ran Casing to 11252.0 ft (7in OD) Circulated at 11252.0 ft Mixed and pumped slurry - 33.800 bbl Mixed and pumped slurry - 33.800 bbl Wait on cement Wait on cement Rigged down Casing handling equipment Rigged down BOP stack Rigged up BOP stack Tested Casing Laid out 5in drill pipe from derrick Racked back drill pipe Racked back drill pipe Worked on BOP - BOP stack Held safety meeting Progress Report Facility M Pt F Pad Well MPF-84 Rig (null) Page 3 Date 10 February 99 Date/Time 15:30-17:00 17:00-19:30 19:30-21:00 21:00-23:30 23:30-01:30 03 Dec 98 01:30-02:30 02:30-06:00 06:00-07:00 07:00-12:30 12:30-15:00 15:00-16:30 16:30-06:00 04 Dec 98 06:00-11:30 11:30-12:30 12:30-13:30 13:30-14:30 14:30-16:00 16:00-01:00 05 Dec 98 01:00-02:30 02:30-06:00 06:00-19:00 19:00-20:30 20:30-01:30 06 Dec 98 01:30-04:30 04:30-06:00 06:00-06:30 06:30-10:00 10:00-11:00 11:00-12:00 12:00-14:00 14:00-20:30 20:30-22:00 22:00-22:30 22:30-01:00 07 Dec 98 01:00-01:30 01:30-03:00 03:00-03:30 03:30-06:00 06:00-06:30 06:30-09:30 09:30-11:00 11:00-13:00 13:00-22:00 22:00-22:30 22:30-23:00 23:00-23:30 23:30-01:30 08 Dec 98 01:30-03:00 03:00-03:30 03:30-04:30 04:30-06:00 06:00-06:30 06:30-13:30 13:30-14:00 Duration 1-1/2 hr 2-1/2 hr 1-1/2 hr 2-1/2 hr 2 hr 1 hr 3-1/2 hr 1 hr 5-1/2 hr 2-1/2 hr 1-1/2 hr 13-1/2 hr 5-1/2 hr lhr 1 hr 1 hr 1-1/2 hr 9 hr 1-1/2 hr 3-1/2 hr 13hr 1-1/2 hr 5 hr 3 hr 1-1/2 hr 1/2 hr 3-1/2 hr 1 hr 1 hr 2hr 6-1/2 hr 1-1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 3 hr 1-1/2 hr 2 hr 9hr 1/2 hr 1/2 hr 1/2 hr 2 hr 1-1/2 hr 1/2 hr 1 hr 1-1/2 hr 1/2 hr 7 hr 1/2 hr Activity Worked on BOP - BOP stack Tested BOP stack Held safety meeting Tested BOP stack Made up BHA no. 4 Serviced Top drive R.I.H. to 5330.0 ft Circulated at 5330.0 ft R.I.H. to 11166.0 ft Drilled installed equipment - Float shoe Circulated at 11280.0 ft Drilled to 11818.0 ft Drilled to 11926.0 ft Circulated at 11926.0 ft Pulled out of hole to 11161.0 ft Serviced Top drive R.I.H. to 11926.0 ft Drilled to 12236.0 ft Circulated at 12236.0 ft Pulled out of hole to 11612.0 ft Jarred stuck pipe at 11612.0 ft Circulated at 11612.0 ft Backreamed to 11599.0 ft Backreamed to 11252.0 ft Circulated at 11252.0 ft Circulated at 11252.0 ft Pulled out of hole to 372.0 ft Pulled BHA Serviced Top drive Made up BHA no. 5 R.I.H. to 11252.0 ft Serviced Block line R.I.H. to 11543.0 ft Circulated at 11543.0 ft Pulled out of hole to 11252.0 ft Circulated at 11543.0 ft Pulled out of hole to 11252.0 ft Pulled out of hole to 5000.0 ft Held safety meeting Pulled BHA Rigged up Handling equipment Ran Liner to 437.0 ft (4-1/2in OD) Ran Drillpipe in stands to 11252.0 ft Circulated at 11252.0 ft Serviced Handling equipment Ran Drillpipe in stands to 11550.0 ft Circulated at 11550.0 ft Mixed and pumped slurry - 16.000 bbl Set Liner hanger at 11112.0 ft with 4200.0 psi Circulated at 11108.0 ft Circulated at 11110.0 ft Held safety meeting Pulled Drillpipe in stands to 0.0 ft Tested Casing DUPLI.CATE RECEIVED DEC 21 1998 B.P. EXPLORATION F PAD, WELL NO. MPF-84 MILNE POINT FIELD, ALASKA BPXA PDC Gyro Continuous Multishot Survey Inside 5" DRILLPIPE Survey date' 28 - NOVEMBER, 1998 Job number' AK1198GCE513 I CONTENTS JOB NUMBER: AK1198GCE513 1. DISCUSSION , SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. INRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT 1. DISCUSSION , SURVEY CERTIFICATION SHEET DISCUSSION JOB NUMBER' AK1198GCE513 Tool 639 was run in WELL# MPF-84 on SCHLUMBERGER 7/32" wireline inside 5" DRILLPIPE. The survey was completed without any problems. SURVEY CERTIFICATION SHEET JOB NUMBER: AK1198GCE513 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the wellsite. Checked by :- JACK E. MAY OPERATIONS MANAGER ta 2. SURVEY DETAILS SURVEY DETAILS JOB NUMBER: AK1198GCE513 CLIENT: B.P. EXPLORATION RIG: SCHLUMBERGER LOCATION: F PAD WELL: MPF-84 LATITUDE: 70.505 N LONGITUDE: 149.4 W SURVEY DATE: SURVEY TYPE : 28 - NOVEMBER, 1998 GYRO CONTINUOUS MULTISHOT DEPTH REFERENCE: ROTARY TABLE ELEVATION 44.08 MAX. SURVEY DEPTH: 101O0' SURVEY TIED ONTO: N/A SURVEY INTERVAL: 0-10100' AP! NUMBER: TARGET DIRECTION: 050-029-22931-00 269.49 GRID CORRECTION: N/A CALCULATION METHOD: MINIMUM CURVATURE SURVEYOR: TOM STODDARD 3. INRUN SURVEY LISTING A Gy r o d a t a D i r e c t i o na I S u rv e y for B.P. EXPLORATION WELL: MPF-84, 5" DP Location: F PAD, MILNE POINT FIELD, ALASKA 3ob Number: AKl198GCES13 Run Date: 28-Nov-98 01:00:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.505000 deg. N Sub-sea Correction from Vertical Reference: 44.08 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 269.490 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location HorizOntal Coordinates Calculated from Local Horizontal Reference A Gyro da t a D i r e c t i ona i Survey B.P. EXPLORATION HELL: MPF-84, 5" DP Location: F PAD, MILNE POINT FIELD, gob Number: AKl198GCE513 ALASKA Page MEASURED I N C L AZIMUTH DEPTH feet deg. deg. DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH deg./ feet feet feet feet deg. 100 ft. HORIZONTAL COORDINATES feet 0.0 0.00 0.00 100.0 .15 302.86 200.0 .25 26.29 300.0 .69 295.58 400.0 1.37 283.67 .00 .15 .27 .74 .71 0.0 -44.1 0.0 0.0 0.0 100.0 55.9 .1 .1 302.9 200.0 155.9 .1 ' .4 339.9 300.0 255.9 .6 1.0 324.1 400.0 355.9 2.3 2.6 300.3 0.0 N 0.0 E .1 N .1 W .3 N .1 W .8 N .6 W 1.3 N 2.3 W 500.0 1.67 283.43 600.0 2.08 282.84 700.0 4.28 278.07 800.0 6.61 277.46 900.0 8.88 274.17 .30 .41 .21 .33 .32 499.9 599.9 699.7 799.3 898.4 455 555 655 755 854 .9 .8 .7 .2 .3 4 8 13 22 36 .8 .0 .5 .9 .3 5.2 291.9 8.5 288.5 14.0 285.0 23.4 282.1 36.9 279.7 2.0 N 4.9 W 2.7 N 8.1 W 3.6 N 13.5 W 4.9 N 22.9 W 6.2 N 36.3 W 1000.0 10.22 278.37 1100.0 12.31 270.95 1150.0 ].3.58 271.33 1200.0 14.08 271.64 1250.0 15.41 271.91 .51 .54 .54 .03 .66 997.0 1095.0 1143.8 1192.3 1240.7 952 1051 1099 1148 1196 .9 .0 .7 .2 .6 52.7 72.2 83.4 95.3 108.0 53.4 278.7 72.9 277.5 84.0 276.7 95.9 276.0 108.6 275.5 8.1 N 52.8 W 9.5 N 72.2 W 9.8 N 83.4 W 10.1 N 95,4 W 10.5 N 108.1 W 1300.0 16.48 271.75 1350.0 17.99 270.46 1400.0 18.54 268.74 1450.0 19.02 267.60 1500.0 19.41 266.77 1550.0 20.66 265.93 1600.0 21.81 265.75 1650.0 23.34 266.29 1700.0 23.88 266.92 1750.0 24.45 267.53 2.14 3 .12 1.53 1.21 .96 2.56 2 .31 3 .11 1.18 1.24 1288.7 1336.5 1384.0 1431.3 147.8.5 1525.5 1572.1 1618.3 1664.1 1709.7 1244.7 1292.4 1339.9 1387.2 1434.5 1481.4 1528.0 1574.2 1620.0 1665.6 121 136 152 168 184 .7 .5 .2 .3 .7 201.8 219.9 239.1 259.1 279.5 122.3 275'.1 137.1 274.7 152.7 274.2 168.7 273.6 185.1 273.0 202.1 272.5 220.1 271.9 239.2 271.4 259.2 271.1 279.6 270.8 10.9 N 11.2 N 11.1 N 10.6 N 9.7 N 8.6 N 7.3 N 6.0 N 4.8 N 3.8 N 121.8 W 136.7 W~ 152.3 W 168.4 W 184.8 W 201.9 W 220.0 W' 239.1 W 259.1 W 279.6 W - A Gyro da t a D i r e c t i o na i Survey B.P. EXPLORATION WELL: MPF-84, 5" DP Location: F PAD, MILNE POINT FIELD, Job Number: AKl198GCES13 ALASKA Page MEASURED I N C L AZIMUTH DOGLEG DEPTH SEVERITY feet deg. deg. deg./ 100 ft. VERTICAL SUBSEA VERTICAL CLOSURE DEPTH DEPTH SECTION DIST. AZIMUTH feet feet feet feet deg.~' HORIZONTAL COORDINATES feet ].800.0 24.75 267.41 .62 1850.0 25.06 267.25 .63 1900.0 25.68 266.73 1.32 1950.0 26.69 265.89 2.15 2000.0 28.05 265.44 2.75 1755.2 1800.5 1845.7 1890.6 1935.0 1711 1756 1801 1846 1890 .1 .4 .6 .5 .9 300.3 321.4 342.8 364.8 387.7 300.4 270.6 321.4 270.3 342.8 270.1 364.8 269.9 387.7 269.7 2.9 N 300.4 W 1.9 N 321.4 W .8 N 342.8 W .6 S 364.8 W 2.4 S 387.7 W 2050.0 29.21 264.89 2.38 2100.0 30.01 264.91 1.59 2150.0 30.46 265.04 .92 2200.0 30.63 265.49 .57 2250.0 30.63 266.16 .69 1978.9 2022.3 2065.5 2108.6 2151.6 1934 1978 2021 2064 2107 .8 .3 .5 .5 .5 411.6 436.2 461.3 486.7 512.1 411.6 269.4 '436.3 269.1 461.4 268.9 486.7 268.7 512.2 268.6 4.4 S 411.6 W 6.6 S 436.2 W 8.8 S 461.3 W 10.9 S 486.6 W 12.7 S 512.0 W 2300.0 31.54, 267.69 2.40 2350.0 32.32 268.53 1.80 2400.0 34.03 269.19 3.50 2450.0 34.98 269.61 1.95 2500.0 36.56 270.01 3.19 2194.4 2236.9 2278.7 2319.9 2360.5 2150 2192 2234 2275 2316 .4 .8 537.9 564.3 591.7 620.0 649.2 538.0 268.5 564.4 268.5 591.8 268.5 620.1 268.5 649.3 268.6 14.1 S 537.8 W 15.0 S 564.2 W 15.5 S 591.6 W 15.8 S 619.9 W 15.9 S 649.1 W 2550.0 36.85 270.11 .60 2600.0 37.54 270.11 1.37 2650.0 37~87 269.78 .77 2700.0 38.25 269.39 .90 2750.0 38.58 268.67 1.11 2400.6 2440.4 2480.0 2519.3 2558.5 2356 2396 2435 2475 2514 .5 .3 .9 .2 .4 679.1 709.4 739.9 770.8 801.8 679.2 268.7 709.4 268.7 740.0 268.8 770.8 268.8 801.9 268.8 15.9 S 679.0 W 15.8 S 709.2 W 15.9 S 739.8 W ].6.1 S 770.6 W 16.6 S 801.7 W 2800.0 39.].1 268.].5 1.25 2850.0 39.22 267.37 1.01 2900.0 39.46 267.23 .51 2950.0 39.60 267.77 .73 3000.0 40.40 268.19 1.69 2597.5 2636.2 2674.9 2713.5 2751.8 2553.4 2592.1 2630.8 2669.4 2707.7 833.2 864.7 896.4 928.2 960.3 833.2 268.8 864.8 268.8 896.5 268.7 928.3 268.7 960.4 268.6 ].7.5 S 833.0 W 18.7 S 864.6 W 20.2 S 896.3 W 21.6 S 928.1 W 22.7 S 960.2 W - A Gyr oda t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: MPF-84, 5" DP Location: F PAD, MILNE POINT FIELD, Job Number: AKl198GCES13 ALASKA Page MEASURED I N C L AZIMUTH DOGLEG DEPTH SEVERITY feet deg. deg. deg./ 100 ft. VERTICAL SUBSEA VERTICAL CLOSURE DEPTH DEPTH SECTION DIST. AZIMUTH feet feet feet feet deg. HORIZONTAL COORDINATES feet 3050.0 40.68 268.91 1.10 3100.0 41.45 268.96 1.54 3150.0 42.45 269.54 2.13 3200.0 43.33 270.06 1.91 3250.0 44.01 270.33 1.40 2789.8 2827.5 2864.6 2901.3 2937.4 2745.7 992.8 992.9 268.6 2783.4 1025.7 1025.8 268.6 2820.6 1059.1 1059.2 268.7 2857.2 1093.1 1093.2 268.7 2893.4 1127.6 1127.7 268.8 23.6 S 992.7 W 24.2 S 1025.5 W 24.6 S 1058.9 W 24.7 S 1092.9 W 24.6 S 1127.5 W 3300.0 45.13 270.27 2.25 3350.0 45.91 270.07 1.58 3400.0 47.34 269.56 2.95 3450.0 48.05 269.07 1.60 3500.0 49.15 269.10 2.20 2973.1 3008.1 3042.4 3076.1 3109.1 2929.0 1162.7 1162.8 268.8 2964.0 1198.4 1198.5 268.8 2998.3 1234.7 1234.8 268.9 3032.0 1271.7 1271.8 268.9 3065.1 1309.2 1309.3 268.9 24.4 S 1162.6 W 24.3 S 1198.2 W 24.4 S 1234.6 W 24.9 S 1271.6 W 25.5 S 1309.1 W 3550.0 49.51 268.88 .78 3600.0 50.67 268.92 2.33 3650.0 51.26 268.73 1.22 3700.0 52.17 268.56 1.83 3750.0 52.77 268.44 1.22 3141.7 3173.8 3205.3 3236.3 3266.7 3097.7 1347.2 1347.2 268.9 3129.7 1385.5 1385.6 268.9 3161.2 1424.3 1424.4 268.9 3192.2 1463.6 1463.7 268.9 3222.7 1503.2 1503.3 268.9 26.1 S 1347.0 W 26.9 S 1385.3 W 27.7 S 1424.1 W 28.6 S 1463.4 W 29.6 S 1503.0 W 3800.0 53.55 268.37 1.56 3850.0 54.35 268.39 1.61 3900.0 54.86 268.52 1.04 3950.0 55.95 268.54 2.18 4000.0 56.65 268.65 1.39 3296.7 3326.1 3355.1 3383.5 3411.2 3252.6 1543.2 1543.3 268.9 3282.1 1583.7 1583.8 268.8 3311.0 1624.4 1624.5 268.8 3339.4 1665.6 1665.7 268.8 3367.1 1707.2 1707.3 268.8 30.8 S 1543.0 W 31.9 S 1583.4 W 33.0 S 1624.2 W 34.1 S 1665.3 W 35.1 S 1706.9 W 4050.0 57.13 268.76 .98 4100.0 57.63 268.99 1.08 4150.0 58.33 269.27 1.48 4200.0 58.81 269.60 1.12 4250.0 60.00 269.67 2.39 3438.5 3465.5 3492.0 3518.1 3543.5 3394.5 3421.4 3447.9 3474.0 3499.4 1749.0 1791.1 1833.5 1876.2 1919.2 1749.1 268.8 1791.3 268.8 1833.7 268.8 1876.3 268.8 1919.3 268.9 36.0 S 1748.8 W 36.9 S 1790.9 W' 37.5 S .1833.3 W 37.9 S 1875.9 W 38.2 S 1919.0 W A G y r o d a t a D i B.P. EXPLOP~ATION WELL: MPF-84, 5" DP Location: F PAD, MILNE POINT FIELD, Job Number: AKl198GCES13 ALASKA MEASURED I N C L AZIMUTH DEPTH feet deg. deg. DOGLEG SEVERITY deg. / 100 ft. VERTICAL DEPTH feet r e c t i o n a 1 Survey SUBSEA VERTICAL CLOSURE DEPTH SECTION DIST. AZIMUTH feet feet feet deg. Page HORIZONTAL COORDINATES feet 4300.0 60.32 269.70 4350.0 61.65 269.72 4400.0 61.87 269.75 4450.0 62.00 269.75 4500.0 61.91 269.71 4550.0 61.85 269.63 4600.0 61.74 269.79 4650.0 6]..80 269.85 4700.0 62.11 269.91 4750.0 61.40 270.34 4800.0 60.98 270.68 4850.0 60.66 270.87 4900.0 61.31 271.01 4950.0 61.63 271.23 5000.0 61.77 271.27 5050.0 61.74 271.11 5].00.0 62.76 271.09 5150.0 63.19 271.12 5200.0 63.11 271.32 5250.0 62.66 271.43 5300.0 62.79 271.46 5350.0 62.37 271.51 5400.0 62.45 271.39 5450.0 61.87 271.38 5500.0 61.84 271.49 .64 2.65 .45 .26 .19 .19 .36 .14 .65 1.62 1.02 .73 1.32 .76 .28 .3O 2.05 .85 .38 .93 .27 .85 .27 1.17 .21 3568.4 3592.7 3616.3 3639.8 3663.3 3686.9 3710.5 3734.2 3757.7 3781.4 3805.5 3829.8 3854.1 3878.0 3901.7 3925.3 3948.6 3971.3 3993.9 4016.7 4039.6 4062.6 4085.8 4109.1 4132.7 3524.3 3548.6 3572.2 3595.8 3619.3 3642.8 3666.5 3690.1 3713.6 3737~3 3761.4 3785.7 3810.0 3833.9 3857.6 3881.3 3904.5 3927.2 3949.8 3972.6 3995.5 4018.6 4041.7 4065.1 4088.7 1962.6 2006.3 2050.4 2094.5 2138.6 2182.7 2226.8 2270.8 2315.0 2359.0 2402.8 2446.5 2490.2 2534.1 2578.1 2622.1 2666.3 2710.9 2755.5 2799.9 2844 .3 2888.7 2933.0 2977.2 3021.2 1962.7 268.9 2006.4 268.9 2050.5 268.9 2094.6 268.9 2138.7 268.9 2182.8 269.0 2226.9 269.0 2270.9 269.0 2315.0 269.0 2359.1 269.0 2402.9 269.1 2446.5 269.1 2490.2 269.1 2534.1 269.2 2578.1 269.2 2622.1 269.2 2666.4 269.3 2710.9 269.3 2755.5 269.3 2799.9 269.4 2844.4 269.4 2888 .7 269.4 2933 .0 269.4' 2977.2 269.5 3021.2 269.5 38.4 S 1962.3 W 38.7 S 2006.1 W 38.9 S 2050.1 W 39.1 S 2094.2 W 39.3 S 2138.4 W 39.5 S 2182.5 W 39.7 S 2226.5 W 39.9 S 2270.6 W 40.0 S 2314.7'W 39.9 S 2358.8 W 39.5 S 2402.6 W 38.9 S 2446.2 W 38.2 S 2489.9 W 37.3 S 2533.8 W 36.3 S 2577.9 W 35.4 S 2621.9 W 34.6 S 2666.1 W 33.7 S 2710.7 W 32.8 S 2755.3 W 31.7 S 2799.8 W 30.6 S 2844.2 W 29.4 S 2888.6 W 28.3 S 2932.9 W 27.2 S 2977.1 W 26.1 S 3021.1 W A G y r o d a t a B.P. EXPLORATION WELL: MPF-84, 5" DP Location: F PAD, MILNE POINT FIELD, Job Number: AKl198GCE513 ALASKA MEASURED I N C L AZIMUTH DEPTH feet deg. deg. DOGLEG SEVERITY deg./ 100 ft. VERTICAL DEPTH feet 5550.0 62.15 271.63 5600.0 62.87 271.23 5650.0 62.97 270.03 5700.0 62.96 269.19 5750.0 62.97 269.21 .67 1.60 2.14 1.51 .04 4156.2 4179.3 4202.1 4224.8 4247.5 5800.0 62.72 269.06 5850.0 61.97 268.59 5900.0 62.23 268.35 5950.0 62.27 268.37 6000.0 61.91 268.29 .57 1.71 .67 .07 .73 4270.3 4293.5 4316.9 4340.2 4363.6 6050.0 62.25 269.27 6100.0 62.64 270.37 6150.0 62.56 270.38 6200.0 62.26 270.08 6250.0 61.98 269.96 1.86 2.11 .16 .80 .59 4387.0 4410.2 4433.2 4456.3 4479.7 6300.0 61.75 270.06 6350.0 63.03 270.04 6400.0 ' 63.32 269.97 6450.0 63.18 269.77 6500.0 62.70 269.50 .49 2.55 .60 .44 1.08 4503 .3 4526.4 4549.0 4571.5 4594.3 6550.0 62.26 269.28 6600.0 62.04 268.87 6650.0 61.64 268.52 6700.0 62.66 268.23 6750.0 63.49 267.77 .96 .85 1.01 2.11 1.84 4617.4 4640.7 4664.3 4687.7 4710.3 Direct i o n a 1 Survey Page SUBSEA VERTICAL CLOSURE DEPTH SECTION DIST. AZIMUTH feet feet feet deg. HORIZONTAL COORDINATES feet 4112.1 3065.4 3065.4 269.5 4135.2 3109.7 3109.7 269.6 4158.0 3154.2 3154.2 269.6 4180.7 3198.7 3198.7 269.6 4203.4 3243.3 3243.3 269.6 4226.2 4249.5 4272.8 4296.1 4319.5 4342.9 4366.1 4389.1 4412.2 4435.6 4459.2 4482.4 4504.9 4527.4 4550.2 3287.8 3332.0 3376.2 3420.5 3464.6 3508.8 3553.1 3597.5 3641.8 3686.0 3730.1 3774.4 3819.0 3863.7 3908.2 3287.8 269.6 3332.0 269.6 3376.2 269.5 3420.5 269.5 3464.6 269.5 3508.8 269.5 3553.1 269.5 3597.5 269.5 3641.8 269.5 3686.0 269.5 3730.1 269.5 3774.4 269.5 3819.0 269.5 3863.7 269.6 3908.2 269.6 4573.3 3952.6 3952.6 269.6 4596.6 3996.8 3996.8 269.5 4620.2 4040.8 4040.8 269.5 4643.6 4085.0 4085.0 269.5 4666.2 4129.6 4129.6 269.5 24.9 S 3065.3 W 23.8 S 3109.6 W 23.3 S 3154.1 W 23.7 S 3198 6 W 24.3 S 3243.2 W 24.9 S 3287.7 W 25.9 S 3331.9 W 27.0 S 3376.1 W 28.3 S 3420.3 W 29.6 S 3464.5 W 30.5 S 3508.7 W 30.7 S 3553.0 W 30.4 S 3597.4 W 30.2 S 3641.7 W 30.2 S 3685.9 W 30.2 S 3730.0 W 30.1 S 3774.3 W 30.1 S 3818.9 W 30.2 S 3863.6 W 30.5 S 3908.1 W 31.0 S 3952.4 W 31.7 S 3996.6 W 32.7 S 4040.7 W 33.9 S 4084.9 W 35.5 S 4129.5 W i o n a 1 S u rve y A Gyrodata Di ~.p. EXPLORATION ~ELL: MPF-84, 5" DP ~ocation: F PAD, MILNE POINT FIELD, lob Number: AKl198GCES13 ALASKA 4EASURED I N C L AZIMUTH DOGLEG DEPTH SEVERITY feet deg. deg. deg./ 100 ft. re ct 6800.0 63.40 267.55 .43 6850.0 62.65 267.43 1.51 6900.0 62.35 267.20 .73 6950.0 61.84 267.04 1.06 7000.0 62.91 267.24 2.16 VERTICAL SUBSEA VERTICAL CLOSURE DEPTH DEPTH SECTION DIST. AZIMUTH feet feet feet feet deg. 7050.0 63.26 267.29 .70 7100.0 62.87 267.03 .91 '7150.0 62.77 267.04 .19 7200.0 62.98 268.31 2.30 7250.0 63.44 268.68 1.13 4732.7 4755.3 4778.4 4801.8 4825.0 7300.0 63.04 268.50 .86 7350.0 62.85 268.23 .61 7400.0 62.57 268.03 .66 7450.0 62.23 267.72 .88 7500.0 62.11 267.58 .34 7550.0 62.06 268.32 1.31 7600.0 62.95 269.18 2.35 7650.0 62.48 269.02 .99 7700.0 62.05 268.76 .96 7750.0 61.91 268.49 .55 4847.7 4870.3 4893.2 4915.9 4938.5 4961.0 4983.7 5006.7 5029.8 5053.2 7800.0 61.44 268.52 .94 7850.0 62.31 269.28 2.19 7900.0 62.37 269.76 .87 7950.0 62.74 269.67 .76 8000.0 61.91 269.38 1.73 5076'.6 5099.7 5122.6 5145.8 5169.3 5193.1 .~5216.6 5239.8 5262.9 5286.1 Page HORIZONTAL COORDINATES feet 4688.6 4711.3 4734.4 4757.8 4780.9 4803.6 4826.2 4849.1 4871.9 4894.4 4916.9 4939.7 4962.6 4985.7 5009.1 5032.5 5055.6 5078.5 5101.8 5125.2 5149.0 5172.5 5195.8 5218.8 5242.0 4174.3 4218.8 4263.2 4307.3 4351.6 4396.1 4440.7 4485.1 4529.6 4574.2 4618.8 4663.4' 4707.8 4752.1 4796.3 4840.4 4884.8 4929.2 4973 .5 5017.6 5061.6 5105.7 5150.0 5194.4 5238.6 4174.3 269.5 4218.8 269.5 4263.2 269.4 4307.3 269.4 4351.6 269.4 4396.1 269.4 4440.7 269.4 4485.1 269.3 4529.6 269.3 4574.2 269.3 4618.9 269.3 4663.4 269.3 4707.8 269.3 4752.1 269.3 4796.3 269.3 4840.5 269.2 4884.8 269.2 4929.3 269.2 4973.5 269.2 5017.7 269.2 5061.7 269.2 5105.8 269.2 5150.]. 269.2 5194.4 269.2 5238.7 269.2 37.3 S 4174.1 W 39.3 S 4218.7 W 41.4 S 4263.0 W 43.6 S 4307.1 W 45.8 S 4351.3 W 47.9 S 4395.9 W 50.1 S 4440.4 W 52.4 S 4484.8 W 54.2 S 4529.3 W 55.4 S 4573.9 W 56.5 S 4618.5 W 57.8 S 4663.0 W 59.2 S 4707.4 W 60.9 S 4751.7 W 62.7 S 4795.9 W 64.3 S 4840.1 W 65.2 S 4884.4 W 65.9 S 4928.8 W 66.8 S 4973.1 W 67.8 S 5017.2 W 69.0 S 5061.2 W 69.8 S 5105.3 W 70.2 S .5149.6 W 70.4 S 5193.9 W 70.8 S 5238.2 W i.ona 1 Survey A Gyroda t a D i r e c t ~.p. EXPLORATION [ELL: MPF-84, 5" DP ,ocation: F PAD, MILNE POINT FIELD, 'ob Number: AKl198GCES13 ALASKA IEASURED I N C L AZIMUTH DEPTH feet deg. deg. DOGLEG SEVERITY deg./ 100 ft. VERTICAL DEPTH feet 8050.0 62.25 269.08 8100.0 61.56 269.07 8150.0 61.67 270.38 8200.0 61.19 270.34 8250.0 60.81 270.19 .87 1.39 2.33 .96 .80. 5309.5 5333.1 5356.8 5380.7 5405.0 8300.0 61.12 270.54 8350.0 62.78 271.48 8400.0 62.12 271.41 8450.0 61.64 271.33 8500.0 61.58 271.14 .88 3.71 1.34 .96 .36 5429 5452 5475 5499 5523 .2 .8 .9 .4 .2 8550.0 60.64 271.03 8600.0 62.09 272.11 8650.0 62.01 272.63 8700.0 62.07 272.68 8750.0 61.61 272.84 1.88 3 .46 ~92 .15 .96 5547 5571 5594 5618 5641 .4 .3 8800.0 63.92 272.82 8850.0 64,49 272.74 8900.0 64.27 272.44 8950.0 63.89 272.18 9000.0 63.41 271.89 9050.0 63.07 272.63 9100.0 62.64 274.22 9150.0 62.50 273.96 9200.0 62.08 273.63 9250.0 61.61 275.24 4.62 1.15 .70 .89 1.09 1.47 2.96 .54 1.03 2.99 5664.7 5686.5 5708.1 5729.9 5752.1 5774.6 5797.4 5820.5 5843.7 5867.3 SUBSEA VERTICAL CLOSURE DEPTH SECTION DIST. AZIMUTH feet feet feet deg. 5265.4 5282.8 5282.9 269.2 5289.0 5326.9 5327.0 269.2 5312.7 5370.9 5371.0 269.2 5336.7 5414.8 5414.9 269.2 5360.9 5458.6 5458.6 269.2 5385.2 5502.3 5502.3 269.3 5408.7 5546.4 5546.4 269.3 5431.8 5590.7 5590.7 269.3 5455.4 5634.8 5634.8 269.3 5479.1 5678.7 5678.7 269.3 5503.3 5722.5 5722.5 269.3 5527.3 5766.3 5766.4 269.3 5550.7 5810.4 5810.5 269.4 5574.1 5854.5 5854.6 269.4 5597.7 5898.6 5898.6 269.4 5620.6 5942.9 5942.9 269.4 5642.4 5987.9 5987.9 269.5 5664.0 6032.9 6032.9 269.5 5685.8 6077.8 6077.8 269.5 5708.0 6122.6 6122.6 269.5 5730.6 6167.2 6167.2 269.6 5753.4 6211.5 6211.6 269.6 5776.4 6255.8 6255.8 269.6 5799.6 6299.9 6299.9 269.6 5823.2 6343.8 6343.9 269.7 Page HORIZONTAL COORDINATES feet 71.4 S 5282.4 W 72.1 S 5326.5 W 72.3 S 5370.5 W 72.0 S 5414.4 W 71.8 S 5458.1 W 71.6 S 5501.8 W 70.8 S 5546.0 W 69.7 S 5590.3 W 68.6 S 5634.4 W 67.7 S 5678.3 W 66.8 S 5722.1 W 65.6 S 5766.0 W 63.8 S 5810.1 W 61.7 S 5854.2 W 59.6 S 5898.3 W 48.0 S 6167.0 W 45.4 S 6211.4 W 42.2 S 6255.7 W 39.3 S 6299.8 W 35.9 S 6343.8 W 57.4 S 5942.7 W 55.2 S 5987.6 W ~ 53.2 S 6032.7 W 51.4 S 6077.6 W 49.8 S 6122.4 W A Gyro da t a D i re c t i ona i Survey B.P. EXPLORATION WELL: MPF-84, 5" DP Location: F PAD, MILNE POINT FIELD, Job Number: AKl198GCE513 ALASKA MEASURED I N C L AZIMUTH DOGLEG DEPTH SEVERITY feet deg. deg. deg./ 100 ft. 9300.0 61.18 277.23 3.60 9350.0 61.16 277.29 .11 9400.0 60.94 277.10 .56 9450.0 60.15 279.60 4.64 9500.0 60.28 280.95 2.36 VERTICAL SUBSEA VERTICAL DEPTH DEPTH SECTION feet feet feet 5891.3 5847.2 5915.4 5871.3 5939.6 5895.5 5964.2 5920.1 5989.0 5944.9 9550.0 60.33 283.71 4.81 9600.0 60.14 284.52 1.45 9650.0 59.97 287.92 5.90 9700.0 60.03 289.08 2.01 9750.0 59.83 291.33 3.92 9800.0 59.80 294.42 5.34 9850.0 60.13 297.53 5.44 9900.0 60.33 300.32 4.85 9950.0 59.71 302.79 4.45 10000.0 59.85 304.49 2.95 6013.8 5969.7 6038.6 5994.5 6063.6 6019.5 6088.6 6044.5 6113.6 6069.5 6138.8 6094.7 6163.8 6119.7 6188.6 6144.5 6213.6 6169.5 6238.8 6194.7 10050.0 59.55 307.24 4.79 10100.0 59.71 308.28 1.81 6264.0 6219.9 6289.3 6245.2 Final Station Closure: Distance: 7029.59 ft Page CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 6387.4 6387.5 269.7 6430.8 6430.9 269.8 6474.2 6474.3 269.8 6517.2 6517.4 269.9 6559.8 6560.0 269.9 6602.2 6602.5 270.0 6644.2 6644.6 270.1 6685.6 6686.2 270.2 6726.6 6727.3 270.3 6767.1 6768.0 270.5 6806.7 6808.0 270.6 6845.5 6847.1 270.8 6883.2 6885.4 270.9 6919.9 6922.7 271.1 6955.7 6959.2 271.3 6990.5 6994.8 271.5 7024.3 7029.6 271.7 Az: 271.71 deg. 31.1 S 6387.4 W 25.6 S 6430.9 W 20.1 S 6474.3 W 13.8 S 6517.3 W 6.1 S 6560.0 W 3.2 N 6602.5 W 13.8 N 6644.5 W 25.9 N 6686.1 W 39.6 N 6727.2 W 54.6 N 6767.8 W 71.4 N 6807.6 W 90.3 N 6846.5 W 111.3 N 6884.5 W 134.0 N 6921.4 W 157.9 N 6957.4 W 183.2 N 209.6 N 6992.4 W 7026.5 W ~[ ~ A Gyro da t a D i r e c t i o na i Survey for B.P. EXPLORATION WELL: MPF-84, 5" DP Location: F PAD, MILNE POINT FIELD, ALASKA Job Number: AKl198GCE513SS Run Date: 28-Nov-98 01:00:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.505000 deg. N Sub-sea Correction from Vertical Reference: 44.08 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 269.490 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location l.{orizontal Coordinates calculated from Loca]. Horizontal. Reference A Gyro d a t a D i r e c t ional Survey B.P. EXPLORATION WELL: MPF-84, 5" DP Location: F PAD, MILNE POINT FIELD, Job Number: AKl198GCE513SS ALASKA Page SUBSEA I N C L AZIMUTH DOGLEG DEPTH SEVERITY feet deg. deg. deg./ 100 ft. VERTICAL VERTICAL CLOSURE DEPTH SECTION DIST. AZIMUTH feet feet feet deg. HORIZONTAL COORDINATES feet -44.1 0.00 0.00 0.00 0.0 .07 334.81 .07 100.0 .19 180.95 .20 200.0 .45 145.00 .48 300.0 .99 290.33 .73 0.0 44.1 144.1 244.1 344.1 0.0 .0 .1 .3 1.3 0.0 0.0 .1 334.8 .4 319.2 1.0 332.9 2.6 313.6 0.0 N 0.0 E .0 N .0 W .2 N .1 W .5 N .3 W 1.0 N 1.3 W 400.0 1.51 283.57 .53 500.0 1.85 283.17 .35 600.0 3.05 280.73 1.21 700.0 5.32 277.80 2.26 800.0 7.64 275.97 2.32 444.1 544.1 644.1 744.1 844.1 3.4 6.3 10.4 17.7 28.9 5.2 296.6 8.5 290.4 14.0 287.0 23.4 283.7 36~9 281.0 1.6 N 3.4 W 2.3 N 6.3 W 3.1 N 10.5 W 4.2 N 17.7 W 5.5 N 29.0 W 900.0 9.50 276.12 1.94 1000.0 11.22 274.81 2.00 1100.0 13.58 271.34 2.53 1200.0 15.49 27]..90 2.62 1300.0 18.08 270.19 2.87 944.1 1044.1 1144.1 1244.1 1344.1 43.9 62.1 83.4 109.0 139.1 53.4 279.2 72.9 278.1 95.9 276.7 122.3 275.5 152.7 274.6 7.1 N 44.0 W 8.8 N 62.1 W 9.8 N 83.5 W 10.5 N 109.1 W 11.2 N 139.2 W 1400.,0 19.12 267.37 ]..14 1500.0 21.11 265.86 2.46 1600.0 23.64 266.65 2.02 1700.0 24.68 267.44 .77 1800.0 25.66 266.75 1.29 ].900.0 28.29 265.33 2.67 2000.0 30.24 264.98 1~25 2100.0 30.63 266.04 .67 2200.0 32.62 268.64 2.09 2300.0 35.92 269.85 2.69 1444.1 1544.1' 1644.1 1744.1 1844.1 2044.1 2144.1 2244.1 2344.1 172.8 209.0 250.3 295.2 342.0 392.7 448.9 507.7 569.1 637.4 185.1 273.4 220.1 272.2 259.2 271.2 300.4 270.6 342.8 270.1 411.6 269.6 461.4 269.0 512.2 268.6 591.8 268.5 649.3 268.6 ].0.3 N 172.8 W 8.1 N 209.1 W 5.3 N 250.4 W 3.1 N 295.3 W .8 N 342.0 W 2.8 S 392.7 W 7.7 S 448.8 W 12.4 S 507.6 W 15.1 S 568.9 W 15.9 S 637.3 W A G y r o d a t a D i ~.p. EXPLORATION ;ELL: MPF-84, 5" DP Jocation: F PAD, MILNE POINT FIELD, rob Number: AKl198GCES13SS ALASKA r e c t i SUBSEA I N C L AZIMUTH DOGLEG VERTICAL VERTICAL DEPTH SEVERITY DEPTH SECTION feet deg. deg. deg./ feet feet 100,ft. 2444 2544 2644 2744 2844 .1 .1 .1 .1 .1 2400.0 37.57 270.08 1.32 2500.0 38.46 268.93 1.03 2600.0 39.27 267.34 .91 2700.0 40.24 268.10 1.50 2800.0 41.90 269.22 1.81 2944 3044 3144 3244 3344 .1 .1 .1 .1 .1 2900.0 44.22 270.32 1.56 3000.0 47.37 269.54 2.88 3100.0 49.59 268.89 .89 3200.0 52.32 268.53 1.68 3300.0 54.67 268.47 1.25 3444.1 3544.1 3644.1 3744.1 3844.1 3400.0 57.23 268.81 1.00 3500.0 60.01 269.67 2.35 3600.0 61.99 269.75 .25 3700.0 61.93 269.88 .36 3800.0 61.04 270.95 1.08 3944.1 4044.1 4144.1 4244.1 4344.1 3900.0 62.56 271.09 1.70 4000.0 62.71 271.47 .38 4100.0 61.99 271.56 .43 4200.0 62.97 269.20 .26 4300.0 62.21 268.35 .18 4444.1 4544.1 4644 .1 4744.1 4844.1 4400.0 62.42 270.24 .46 4500.0 63.26 269.99 1.03 4600.0 61.98 268.82 .88 4700.0 63.02 267.49 .97 4800.0 63.20 267.28 .94 712.2 790.4 871.2 953 .9 1040.6 1134.2 1236.6 1350.0 1473.7 1608.9 1757.7 1920.2 2102.5 2289.4 2472.1 2657.7 2852.9 3042.6 3236.6 3427.8 3618.4 3809.3 4003.1 4196.7 4389.1 o n a 1 Survey Page CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 740.0 268.7 801.9 268.8 896.5 268.7 960.4 268.6 1059.2 268.7 1162.8 268.8 1271.8 268.9 1385.6 268.9 1503.3 268.9 1624.5 268.8 1791.3 268.8 1962.7 268.9 2138.7 268.9 2315.0 269.0 2490.2 269.1 2666.4 269.3 2888.7 269.4 3065.4 269.5 3243.3 269.6 3464.6 269.5 3641.8 269.5 3819.0 269.5 4040.8 269.5 4218.8 269.5 4396.1 269.4 15.8 S 712.1 W 16.4 S 790.3 W 19.0 S 871.0 W 22.5 S 953.7 W 24.4 S 1040.4 W 24.6 S 1134.0 W 24.5 S 1236.4 W 26.2 S 1349.8 W 28.9 S 1473.5 W 32.6 S 1608.7 W 36.2 S 1757.4 W 38.2 S 1919.9 W 39.1 S 2102.2 W 39.9 S 2289.2 W 38.5 S 2471.9 W 34.8 S 2657.5 W 30.4 S 2852.8 W 25.6 S 3042.5 W 24.2 S 3236.5 W 28.5 S 3427.7 W 30.3 S 3618.3 W 30.1 S 3809.2 W 31.8 S 4002.9 W 38.3 S 4196.6 W 47.6 S 4388.8 W A Gyrodat a D i r e c t i o n a i Survey B.P. EXPLORATION WELL: MPF-84, 5" DP Location: F PAD, MILNE POINT FIELD, Job Number: AKl198GCES13SS ALASKA Page SUBSEA I N C L AZIMUTH DOGLEG DEPTH SEVERITY feet deg. deg. deg./ 100 ft. VERTICAL VERTICAL CLOSURE DEPTH SECTION DIST. AZIMUTH feet feet feet deg. HORIZONTAL COORDINATES feet 4900.0 63.34 268.64 1.07 5000.0 62.16 267.63 .55 5100.0 62.09 268.77 .97 5200.0 62.44 269.75 .85 5300.0 61.61 269.68 1.82 4944.1 4585.3 4618.9 269.3 5044.1 4779.1 4796.3 269.3 5144.1 4970.1 4973.5 269.2 5244.1 5158.2 5194.4 269.2 5344.1 5347.3 5371.0 269.2 55.7 S 4585.0 W 62.0 S 4778.7 W 66.7 S 4969.7 W 70.2 S 5157.7 W 72.2 S 5346.9 W 5400.0 62.17 271.13 2.66 5500.0 60.77 271.05 1.68 5600.0 61.84 272.84 1.32 5700.0 63.58 272.00 1.02 5800.0 62.07 273.66 1.06 5444.1 5530.1 5546.4 269.3 5544.1 5716.5 5722.5 269.3 5644.1 5902.9 5942.9 269.4 5744.1 6106.4 6122.6 269.5 5844.1 6300.6 6343,9 269.6 71.1 S 5529.7 W 66.9 S 5716.1 W 59.4 S 5902.7 W 50.4 S 6106.1 W 39.2 S 6300.5 W 5900.0 60.80 277.55 1.31 6000.0 60.10 285.26 2.43 6100.0 59.87 295.08 5.36 6200.0 59.78 305.06 3.33 6245.2 59.71 308.28 '1.81 5944.]. 6482.1 6517.4 269.8 6044.1 6653.3 6686.2 270.1 6144.1 6814.9 6847.1 270.6 6244.1 6963.0 6994.8 271.3 6289.3 7024.3 7029.6 271.7 19.0 S 6482.2 W 16.5 N 6653.7 W 75.4 N 6815.9 W 163.2 N 6964.7 W 209.6 N 7026.5 W Final Station Closure: Distance: 7029.59 ft Az: 271.71 deg. 4. QUALITY CONTROL QUALITY CONTROL REPORT JOB NUMBER: AK1198GCE513 TOOL NUMBER: 639 MAXIMUM GYRO TEMPERATURE: 79.89 C MAXIMUM AMBIENT TEMPERATURE: 42.6O C MAXIMUM INCLINATION: 64.49 AVERAGE AZIMUTH: 271.71 WIRELINE REZERO VALUE: ! REZERO ERROR / K: N/A CALIBRATION USED FOR FIELD SURVEY: 2692 CALIBRATION USED FOR FINAL SURVEY: 2692 PRE JOB MASS BALANCE OFFSET CHECK: .55 POST JOB MASS BALANCE OFFSET CHECW: USED O.O/N/A CONTINUOUS CONDITION OF SHOCK WATCHES .6O UPON ARRIVAL AT RIG: OK UPON COMPLETION OF SURVEY: OK UPON RETURN TO ATLAS: OK BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH TVD NORTHING EASTING MWD 10100 59.42 306.9 FINAL SURVEY 10100 59.71 308.28 6285.1 6289.3 164.5 209.6 -7040.9 -7026.5 FUNCTION TEST JOB NUMBER · AK1198GCE513 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 1100 12.31 12.31 12.31 12.31 12.31 AZIMUTH M.D. ft 1 2 3 4 5 1100 270.95 270.96 270.95 270.96 270.97 5. EQUIPMENT AND CHRONOLOGICAL REPORT EQUIPMENT REPORT JOB NUMBER: AK1198GCE513 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 639 GYRO SECTION DATA SECTION POWER SECTION COMPUTER A0236 POWER SUPPLY C0111 PRINTER C0083 INTERFACE A0433 A0085 A0079 A0143 BACKUP TOOL No. 638 GYRO SECTION DATA SECTION POWER SECTION COMPUTER A0235 POWER SUPPLY C0089 PRINTER C0086 INTERFACE A0467 A0107 A0029 A0055 WIRELINE COMPANY: SCHLUMBERGER CABLE SIZE: 7/32" RUNNING GEAR 2.25" HOUSING w/ ECCENTRIC BAR TOTAL LENGTH OF TOOL: 30' MAXIMUM O.D.: 2.25 INCHES TOTAL WEIGHT OF TOOL: 210 POUNDS · ! CHRONOLOGICAL REpoRT JOB NUMBER · AK1198GCE513 THURSDAY, 11/26/98 12:00 CHECK TOOLS, STANDBY FRIDAY, 11/27/98 20:00 TO LOCATION 21:30 MU TOOL 24:00 RU SCHLUMBERGER, WARM LIP TOOL SATURDAY, 1 01:00 03:15 05:00 06:00 07:30 09:00 09:30 11:00 13:00 1/28/98 PICK LIP GYRO RIH SURVEY IN TO 10100' SURVEY OUT LD TOOL, RD SCHLUMBERGER. TO ATLAS PROCESS SURVEY, CHECK TOOLS. TO MILNE POINT WITH RESULTS RETURN TO ATLAS. TO ANCHORAGE ANADRILL SCHLUMBERGER Survey report Client ................... : BP Exploration (Alaska) Inc. Field .................... : Milne Point Unit Well ..................... : MPF-84 API number ............... : 50-029-22931 Engineer ................. : J. Rathert o,!:g: ..................... : Nabors 27E ,,[.ate: ................... : Alaska Survey calculation methods Method for positions ..... : Minimum curvature Method for DLS ........... : Mason & Taylor Depth reference - Permanent datum .......... : Mean Sea Level Depth reference .......... : Drill Floor GL above permanent ....... : 10.90 ft KB above permanent ....... : 44.08 ft DF above permanent ....... : 44.08 ft Vertical section origin Latitude (+N/S-) ......... : Departure (+E/W-) ........ : 0.00 ft 0.00 ft Platform reference point- -~titude (+N/S-) ......... : -999.25 ft .~parture (+E/W-) ........ : -999.25 ft Azimuth from rotary table to target: 316.71 degrees 6-Dec-98 02:25:40 Page CEIVEO BPXA PDC 1 of 9 Spud date ................ : 21-Nov-98 Last survey date ......... : 05-Dec-98 Total accepted surveys...: 223 MD of first survey ....... : 0.00 ft MD of last survey ........ : 12236.28 ft Geomagnetic data Magnetic model ........... : BGGM version 1998 Magnetic date ............ : 21-Nov-1999 Magnetic field strength..: 1145.75 HCNT Magnetic dec (+E/W-) ..... : 27.37 degrees Magnetic dip ............. : 80.75 degrees MWD survey Reference Criteria - Reference G .............. : 1003.00 mGal Reference H .............. : 1145.00 HCNT Reference Dip ............ : 80.75 degrees Tolerance of G ........... : (+/-) 4.00 mGal Tolerance of H ........... : (+/-) 6.00 HCNT Tolerance of Dip ......... : (+/-) 0.30 degrees Corrections - -- Magnetic dec (+E/W-) ..... : 27.37 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-) .... : 27.37 degrees (Total az corr = magnetic dec - grid conv) Sag applied (Y/N) ........ : No degree: 0.00 [(c)1998 Anadrill IDEAL ID5 iA 12R] _ -- ANADRILL SCHLUMBERGER Survey Report 6-Dec-98 02:25:40 Page 2 of 9 Seq Measured Incl Azimuth Course % depth angle angle length - (ft) (deg) (deg) (ft) 1 0.00 0.00 0.0 2 100.00 0.15 302.9 3 200.00 0.25 26.3 4 300.00 0.69 295.6 5 400.00 1.37 283.7 6 500.00 1.67 283.4 .ii,,:: 7 600.00 2.08 282.8 8 700.00 4.28 278.1 9 800.00 6.61 277.5 10 900.00 8.88 274.2 11 1000.00 10.22 278.4 12 1100.00 12.31 271.0 13 1150.00 13.58 271.3 14 1200.00 14.08 271.6 15 1250.00 15.41 271.9 16 1300.00 16.48 271.8 17 1350.00 17.99 270.5 18 1400.00 18.54 268.7 19 1450.00 19.02 267.6 20 1500.00 19.41 266.8 21 1550.00 20.66 265.9 22 1600.00 21.81 265.8 "23 1650.00 23.34 266.3 24 1700.00 23.88 266.9 25 1750.00 24.45 267.5 26 1800.00 24.75 267.4 27 1850.00 25.06 267.3 28 1900.00 25.68 266.7 29 1950.00 26.69 265.9 30 2000.00 28.05 265.4 0.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 TVD Vertical Displ Displ Total At DLS Srvy Tool depth section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type 0.00 0.00 0.00 0.00 100.00 0.13 0.07 -0.11 200.00 0.33 0.34 -0.12 300.00 0.97 0.79 -0.57 399.98 2.53 1.34 -2.27 499.94 599.89 699.73 799.27 898.35 996.97 1095.04 1143.77 1192.32 1240.67 1288.75 1336.50 1383.98 1431.32 1478.53 1525.51 1572.11 1618.28 1664.09 1709.71 1755.17 1800.53 1845.70 1890.57 1934.97 4.75 1.96 -4.85 7.48 2.70 -8.04 11.90 3.63 -13.50 19.28 4.90 -22.91 29.43 6.22 -36.31 42.08 56.48 64.33 72.74 81.75 91.48 101.85 112.51 123.16 133.85 144.77 156.20 168.37 181.21 194.51 208.09 221.80 235.65 249.71 264.16 8.08 -52.79 9.56 -72.22 9.79 -83.42 10.09 -95.37 10.48 -108.09 10.93 -121.82 11.22 -136.63 11.10 -152.30 10.58 -168.39 9.78 -184.82 8.68 -201.91 7.37 -219.98 6.05 -239.13 4.86 -259.12 3.87 -279.56 2.94 -300.35 1.97 -321.39 0.84 -342.78 -0.58 -364.80 -2.33 -387.71 0.00 0.00 0.00 TIP 0.13 302.90 0.15 MWD M -- 0.36 339.97 0.28 MWD M -- 0.98 324.33 0.74 MWD M -- 2.64 300.45 0.71 MWD M -- 5.23 291.97 0.30 MWD M -- 8.48 288.55 0.41 MWD M -- 13.98 285.03 2.21 MWD M -- 23.43 282.08 2.33 MWD M 36.84 279.72 2.31 MWD M -- 53.40 278.70 1.51 MWD M 72.86 277.54 2.54 MWD M -- 84.00 276.69 2.54 MWD M 95.90 276.04 1.01 MWD M -- 108.60 275.54 2.66 MWD M 122.31 275.12 137.09 274.69 152.70 274.17 168.72 273.60 185.08 273.03 2.14 3.12 1.58 1.19 0.94 MWD M -- MWD M -- MWD M -- MWD M MWD M -- 202.10 272.46 2.57 MWD M -- 220.10 271.92 2.30 MWD M -- 239.20 271.45 3.08 MWD M -- 259.16 271.08 1.18 MWD M -- 279.59 270.79 1.24 MWD M 300.37 270.56 0.61 MWD M -- 321.39 270.35 0.63 MWD M -- 342.78 270.14 1.34 MWD M -- 364.80 269.91 2.14 MWD M 387.72 269.66 2.76 MWD M -- [(c) 1998 Anadrill IDEAL ID5 iA 12RI -- -- ANADRILL SCHLUMBERGER Survey Report 6-Dec-98 02:25:40 Page 3 of 9 Seq Measured Incl Azimuth Course % depth angle angle length - (ft) (deg) (deg) (ft) TVD Vertical Displ Displ Total At DLS Srvy Tool depth section +N/S- +E/W- displ Azim (deg/ tool qual {ft) (ft) (ft) (ft) (ft) (deg) I00f) type type 31 2050.00 29.21 264.9 50.00 1978.86 279.05 32 2100.00 30.01 264.9 50.00 2022.33 294.32 33 2150.00 30.46 265.0 50.00 2065.53 309.91 34 2200.00 30.63 265.5 50.00 2108.59 325.74 35 2250.00 30.63 266.2 50.00 2151.61 341.82 36 2300.00 31.54 267.7 50.00 2194.43 358.50 37 2350.00 32.32 268.5 50.00 2236.87 375.98 38 2400.00 34.03 269.2 50.00 2278.72 394.34 39 2450.00 34.98 269.6 50.00 2319.92 413.55 40 2500.00 36.56 270.0 50.00 2360.49 433.52 41 2550.00 36.85 270.1 50.00 2400.57 454.03 42 2600.00 37.54 270.1 50.00 2440.40 474.79 43 2650.00 37.87 269.8 50.00 2479.96 495.74 44 2700.00 38.25 269.4 50.00 2519.33 516.72 45 2750.00 38.58 268.7 50.00 2558.51 537.64 46 2800.00 39.11 268.2 50.00 2597.45 558.50 47 2850.00 39.22 267.4 50.00 2636.21 579.23 48 2900.00 39.46 267.2 50.00 2674.88 599.85 49 2950.00 39.60 267.8 50.00 2713.45 620.64 50 3000.00 40.40 268.2 50.00 2751.75 641.85 51 3050.00 40.68 268.9 50.00 2789.75 663.53 52 3100.00 41.45 269.0 50.00 2827.45 685.61 53 3150.00 42.45 269.5 50.00 2864.63 708.21 54 3200.00 43.33 270.1 50.00 2901.27 731.46 55 3250.00 44.01 270.3 50.00 2937.43 755.22 56 3300.00 45.13 270.3 50.00 2973.05 779.41 57 3350.00 45.91 270.1 50.00 3008.08 803.97 58 3400.00 47.34 269.6 50.00 3042.42 828.81 59 3450.00 48.05 269.1 50.00 3076.08 853.86 60 3500.00 49.15 269.1 50.00 3109.14 879.15 -4.36 -411.59 -6.55 -436.19 -8.77 -461.27 -10.87 -486.60 -12.72 -512.00 -14.08 -537.78 -14.96 -564.21 -15.50 -591.56 -15.80 -619.88 -15.90 -649.11 -15.87 -678.99 -15.82 -709.22 -15.85 -739.80 -16.06 -770.62 -16.58 -801.69 411.61 269.39 2.37 MWD M -- 436.24 269.14 1.60 MWD M -- 461.36 268.91 0.91 MWD M -- 486.72 268.72 0.61 MWD M -- 512.16 268.58 0.71 MWD M 537.96 268.50 564.41 268.48 591.77 268.50 620.09 268 . 54 649.30 268.60 679.18 268.66 709.40 268.72 739.97 268 . 77 770.79 268.81 801.86 268.82 -17.46 -833.03 833.22 -18.70 -864.59 864.79 -20.19 -896.25 896.48 -21.58 -928.04 928.29 -22.70 -960.16 960.43 -23.52 -992.65 992.93 -24.12 -1025.49 1025.77 -24.56 -1058.91 1059.19 -24.67 -1092.94 1093.22 -24.55 -1127.46 1127.73 -24.37 -1162.55 1162.81 -24.25 -1198.23 1198.47 -24.34 -1234.57 1234.81 -24.76 -1271.54 1271.78 -25.35 -1309.04 1309.29 268.80 268.76 268.71 268.67 268.65 268.64 268.65 268.67 268.71 268.75 268.80 268.84 268.87 268.88 268.89 2.39 1.77 3.50 1.95 3.19 0.59 1.38 0.76 0.91 1.09 1.30 0.91 0.54 0.81 1.68 1.07 1.55 2.11 1.94 1.39 2.24 1.59 2.95 1.60 2.20 MWD M -- MWD M -- MWD M -- MWD M -- MWD M MWD M -- MWD M -- MWD M -- MWD M MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- [ c)1998 Anadrill IDEAL ID5 iA 12R] -- -- ANADRILL SCHLUMBERGER Survey Report 6-Dec-98 02:25:40 Page 4 of 9 Seq Measured Incl Azimuth Course % depth angle angle length - (ft) (deg) (deg) (ft) 61 3550.00 49.51 268.9 62 3600.00 50.67 268.9 63 3650.00 51.26 268.7 64 3700.00 52.17 268.6 65 3750.00 52.77 268.4 66 3800.00 53.55 268 . 4 2 67 3850.00 54 . 35 268 . 4 68 3900.00 54.86 268.5 69 3950.00 55.95 268.5 70 4000.00 56.65 268.7 71 4050.00 57.13 268.8 72 4100.00 57.63 269.0 73 4150.00 58.33 269.3 74 4200.00 58.81 269.6 75 4250.00 60.00 269.7 76 4300.00 60.32 269.7 77 4350.00 61.65 269.7 78 4400.00 61.87 269.8 79 4450.00 62.00 269.8 80 4500.00 61.91 269.7 81 4550.00 61.85 269.6 ~,82 4600.00 61.74 269.8 · '83 4650.00 61.80 269.9 84 4700.00 62.11 269.9 85 4750.00 61.40 270.3 86 4800.00 60.98 270.7 87 4850.00 60.66 270.9 88 4900.00 61.31 271.0 89 4950.00 61.63 271.2 90 5000.00 61.77 271.3 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 TVD depth (ft) 3141.73 3173.80 3205.29 3236.27 3266.73 3296.71 3326.13 3355.09 3383.48 3411.23 3438.54 3465.49 3492.00 3518.07 3543.52 3568.40 3592.65 3616.31 3639.83 3663.34 3686.91 3710.54 3734.19 3757.70 3781.36 3805.46 3829.83 3854.09 3877.97 3901.67 Vertical Displ Displ Total At DLS Srvy Tool section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (deg) i00f) type type 904.66 930.42 956.45 982.69 1009.11 1035.72 1062.61 1089.74 1117.17 1144.92 1172.94 1201.22 1229.83 1258.79 1288.10 1317.68 1347.49 1377.56 1407.70 1437.81 1467.86 1497.90 1528.02 1558.23 1588.48 1618.80 1649.18 1679.68 1710.41 1741.29 -26.01 -1346.96 -26.75 -1385.31 -27.56 -1424.14 -28.49 -1463.37 -29.53 -1503.01 -30.65 -1543.01 -31.77 -1583.42 -32.88 -1624.16 -33.95 -1665.31 -35.01 -1706.89 -35.96 -1748.76 -36.76 -1790.87 -37.39 -1833.25 -37.80 -1875.92 -38.06 -1918.95 -38.29 -1962.32 -38.52 -2006.05 -38.71 -2050.10 -38.87 -2094.22 -39.06 -2138.34 -39.33 -2182.44 -39.56 -2226.50 -39.67 -2270.56 -39.75 -2314.69 -39.68 -2358.73 -39.29 -2402.54 -38.68 -2446.19 -37.96 -2489.91 -37.12 -2533.83 -36.16 -2577.84 1347.21 268.89 0.78 1385.57 268.89 2.32 1424.40 268.89 1.22 1463.65 268.88 1.83 1503.30 268.87 1.24 MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- 1543.31 268.86 1.56 MWD M 1583.74 268.85 1.60 MWD M -- 1624.50 268.84 1.03 MWD M -- 1665.65 268.83 2.18 MWD M 1707.25 268.83 1.41 MWD M -- 1749.13 268.82 1.02 1791.24 268.82 1.06 1833.64 268.83 1.49 1876.30 268.85 1.09 1919.33 268.86 2.39 1962.70 268.88 0.64 2006.42 268.90 2.66 2050.46 268.92 0.47 2094.58 268.94 0.26 2138.70 268.95 0.25 2182.80 268.97 0.21 2226.86 268.98 0.42 2270.90 269.00 0.21 2315.03 269.02 0.62 2359.07 269.04 1.59 2402.86 269.06 1.09 2446.50 269.09 0.73 2490.20 269.13 1.31 2534.10 269.16 0.73 2578.10 269.20 0.33 MWD M -- MWD M -- MWD M -- MWD M -- MWD M MWD M -- MWD M MWD M -- MWD M -- MWD M -- MWD M MWD M MWD M MWD M -- MWD M MWD M -- MWD M -- MWD M -- MWD M MWD M -- [(c)1998 Anadrill IDEAL ID5 iA 12R] __ -- ANADRILL SCHLUMBERGER Survey Report 6-Dec-98 02:25:40 Page 5 of 9 Seq Measured Incl Azimuth Course % depth angle angle length - (ft) (deg) (deg) (ft) 91 5050.00 61.74 271.1 92 5100.00 62.76 271.1 93 5150.00 63.19 271.1 94 5200.00 63.11 271.3 95 5250.00 62.66 271.4 96 5300.00 62.79 271.5 · ii~97 5350.00 62.37 271.5 98 5400.00 62.45 271.4 99 5450.00 61.87 271.4 100 5500.00 61.84 271.5 101 5550.00 62.15 271.6 102 5600.00 62.87 271.2 103 5650.00 62.97 270.0 104 5700.00 62.96 269.2 105 5750.00 62.97 269.2 106 5800.00 62.72 269.1 107 5850.00 61.97 268.6 108 5900.00 62.23 268.4 109 5950.00 62.27 268.4 110 6000.00 61.91 268.3 111 6050.00 62.25 269.3 12 6100.00 62.64 270.4 13 6150.00 62.56 270.4 114 6200.00 62.26 270.1 115 6250.00 61.98 270.0 116 6300.00 61.75 270.1 117 6350.00 63.03 270.0 118 6400.00 63.32 270.0 119 6450.00 63.18 269.8 120 6500.00 62.70 269.5 50.00 5O.O0 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 5O.O0 50.00 50.00 50.00 50.00 50.00 50.00 TVD depth (ft) 3925.33 3948.61 3971.33 3993.92 4016.70 4039.62 4062.64 4085.80 4109.15 4132.73 4156.21 4179.29 4202.05 4224.78 4247.51 4270.33 4293.54 4316.93 4340.21 4363.62 4387.03 4410.16 4433.17 4456.33 4479.71 4503.28 4526.46 4549.02 4571.52 4594.27 Vertical section (ft) 1772.16 1803.11 1834.27 1865.53 1896.80 1928.08 1959.35 1990.54 2021.64 2052.67 2083.80 2114.99 2145.85 2176.16 2206.25 2236.27 2265.98 2295.43 2324.86 2354.22 2383.83 2414.14 2444.81 2475.33 2505.67 2535.93 2566.34 2596.93 2627.49 2657.82 Displ Displ Total At DLS Srvy Tool +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (deg) 100f) type type -35.23 -2621.88 -34.38 -2666.12 -33.53 -2710.65 -32.59 -2755.25 -31.55 -2799.75 -30.42 -2844.17 -29.26 -2888.54 -28.14 -2932.84 -27.06 -2977.04 -25.94 -3021.11 -24.75 -3065.24 -23.66 -3109.58 -23.20 -3154.10 -23.51 -3198.63 -24.13 -3243.16 -24.79 -3287.65 -25.68 -3331.93 -26.84 -3376.10 -28.07 -3420.33 -29.34 -3464.50 -30.27 -3508.67 -30.38 -3552.99 -30.07 -3597.38 -29.88 -3641.70 -29.84 -3685.89 -29.80 -3729.99 -29.77 -3774.29 -29.77 -3818.91 -29.84 -3863.56 -30.11 -3908.08 2622.12 269.23 0.36 2666.34 269.26 2.04 2710.86 269.29 0.86 2755.45 269.32 0.39 2799.92 269.35 0.92 2844.33 269.39 2888.69 269.42 2932.97 269.45 2977.16 269.48 3021.22 269.51 0.31 0.84 0.24 1.16 0.19 3065.34 269.54 0.64 3109.67 269.56 1.61 3154.18 269.58 2.15 3198.72 269.58 1.43 3243.25 269.57 0.02 3287.74 269.57 0.53 3332.03 269.56 1.74 3376.21 269.54 0.63 3420.45 269.53 0.08 3464.62 269.51 0.74 3508.80 269.51 1.89 3553.12 269.51 2.10 3597.51 269.52 0.16 3641.82 269.53 0.80 3686.02 269.54 0.59 3730.11 269.54 3774.41 269.55 3819.03 269.55 3863.67 269.56 3908.20 269.56 0.49 2.57 0.58 0.45 1.10 MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- MWD M [(c)1998 Anadrill IDEAL ID5 iA 12RI -- _ ANADRILL SCHLUMBERGER Survey Report 6-Dec-98 02:25:40 Page 6 of 9 Seq Measured Incl Azimuth Course % depth angle angle length - (ft) (deg) (deg) (ft) TVD Vertical Displ Displ Total At DLS Srvy Tool depth section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (ft) (deg) i00f) type type 121 6550.00 62.26 269.3 50.00 4617.37 122 6600.00 62.04 268.9 50.00 4640.73 123 6650.00 61.64 268.5 50.00 4664.33 124 6700.00 62.66 268.2 50.00 4687.69 125 6750.00 63.49 267.8 50.00 4710.33 !26 6800.00 63.40 267.6 50.00 4732.68 '~27 6850.00 62.65 267.4 50.00 4755.36 '128 6900.00 62.35 267.2 50.00 4778.45 129 6950.00 61.84 267.0 50.00 4801.85 130 7000.00 62.91 267.2 50.00 4825.03 131 7050.00 63.26 267.3 50.00 4847.66 132 7100.00 62.87 267.0 50.00 4870.31 133 7150.00 62.77 267.0 50.00 4893.15 134 7200.00 62.98 268.3 50.00 4915.95 135 7250.00 63.44 268.7 50.00 4938.49 136 7300.00 63.04 268.5 50.00 4961.00 137 7350.00 62.85 268.2 50.00 4983.74 138 7400.00 62.57 268.0 50.00 5006.67 139 7450.00 62.23 267.7 50.00 5029.83 140 7500.00 62.11 267.6 50.00 5053.17 141 7550.00 62.06 268.3 50.00 5076.58 ~!42 7600.00 62.95 269.2 50.00 5099.67 ~43 7650.00 62.48 269.0 50.00 5122.59 144 7700.00 62.05 268.8 50.00 5145.85 145 7750.00 61.91 268.5 50.00 5169.34 50.00 50.00 50.00 50.00 50.00 146 7800.00 61.44 268.5 147 7850.00 62.31 269.3 148 7900.00 62.37 269.8 149 7950.00 62.74 269.7 150 8000.00 61.91 269.4 5193.07 5216.64 5239.85 5262.89 5286.12 2687.89 2717.69 2747.18 2776.56 2805.97 2835.28 2864.36 2893.22 2921.85 2950.56 2979.53 3008.45 3037.21 3066.37 3096.11 3125.92 3155.51 3184.89 3214.04 3243.02 3272.14 3301.84 3331.80 3361.52 3391.02 3420.35 3449.97 3480.08 3510.36 3540.47 -30.58 -3952.42 3952.54 269.56 -31.27 -3996.63 3996.75 269.55 -32.27 -4040.70 4040.83 269.54 -33.55 -4084.89 4085.03 269.53 -35.10 -4129.44 4129.59 269.51 -36.94 -4174.13 4174.29 269.49 -38.92 -4218.64 4218.82 269.47 -41.01 -4262.94 4263.14 269.45 -43.24 -4307.07 4307.29 269.42 -45.48 -4351.32 4351.55 269.40 -47.62 -4395.85 4396.11 269.38 -49.84 -4440.37 4440.65 269.36 -52.17 -4484.79 4485.09 269.33 -53.99 -4529.25 4529.57 269.32 -55.16 -4573.87 4574.20 269.31 -56.25 -4618.50 4618.84 269.30 -57.53 -4663.01 4663.36 269.29 -59.01 -4707.42 4707.79 269.28 -60.67 -4751.70 4752.08 269.27 -62.48 -4795.88 4796.28 269.25 -64.06 -4840.03 4840.45 269.24 -65.03 -4884.37 4884.80 269.24 -65.72 -4928.80 4929.24 269.24 -66.57 -4973.05 4973.50 269.23 -67.61 -5017.18 5017.63 269.23 -68.77 -5061.18 5061.64 269.22 -69.61 -5105.26 5105.74 269.22 -69.96 -5149.55 5150.02 269.22 -70.15 -5193.92 5194.39 269.23 -70.50 -5238.20 5238.67 269.23 0.95 0.83 1.07 2.11 1.81 0.57 1.51 0.70 1.08 2.17 0.72 0.95 0.20 2.35 1.16 0.88 0.66 0.66 0.86 0.30 1.24 2.39 1.00 0.93 0.60 0.94 2.24 0.89 0.76 1.74 MWD M MWD M MWD M i MWD M -- MWD M -- MWD M -- MWD M -- MWD M i MWD M I MWD M i MWD M I MWD M MWD M i MWD M i MWD M -- MWD M -- MWD M I MWD M -- MWD M I MWD M i MWD M MWD M i MWD M -- MWD M i MWD M I MWD M I MWD M i MWD M I MWD M I MWD M -- [(c)1998 Anadrill IDEAL ID5 IA 12RI -- I ANADRILL SCHLUMBERGER Survey Report 6-Dec-98 02:25:40 Page 7 of 9 Seq Measured Incl Azimuth Course % depth angle angle length - (ft) (deg) (deg) (ft) 151 8050.00 62.25 269.1 152 8100.00 61.56 269.1 153 8150.00 61.67 270.4 154 8200.00 61.19 270.3 155 8250.00 60.81 270.2 156 8300. O0 61.12 270.5 1357 8350. O0 62.78 271.5 "158 8400. O0 62.12 271.4 159 8450.00 61.64 271.3 160 8500.00 61.58 271.1 161 8550.00 60.64 271.0 162 8600.00 62.09 272.1 163 8650.00 62.01 272.6 164 8700.00 62.07 272.7 165 8750.00 61.61 272.8 166 8800.00 63.92 272.8 167 8850.00 64.49 272.7 168 8900.00 64.27 272.4 169 8950.00 63.89 272.2 170 9000.00 63.41 271.9 171 9050.00 63.07 272.6 ]_72 9100.00 62.64 274.2 ~73 9150.00 62.50 274.0 174 9200.00 62.08 273.6 175 9250.00 61.61 275.2 176 9300.00 61.18 277.2 177 9350.00 61.16 277.3 178 9400.00 60.94 277.1 179 9450.00 60.15 279.6 180 9500.00 60.28 281.0 50.00 5O.O0 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 TVD depth (ft) 5309.53 5333.08 5356.85 5380.76 5405.00 5429.26 5452.78 5475.90 5499.47 5523.24 5547.40 5571.36 5594.79 5618.24 5641.83 5664.71 5686.47 5708.09 5729.95 5752.14 5774.65 5797.47 5820.50 5843.75 5867.34 5891.28 5915.40 5939.60 5964.19 5989.03 Vertical Displ Displ section +N/S- +E/W- (ft) (ft) (ft) 3570.34 3600.08 3630.10 3660.41 3690.53 3720.70 3751.51 3782.72 3813.70 3844.53 3875.13 3906.07 3937.65 3969.38 4001.12 4033.14 4065.55 4097.89 4130.02 4161.88 4193.75 4226.12 4258.78 4291.20 4323.80 4357.17 4390.99 4424.75 4458.88 4493.80 -71.08 -5282.37 -71.77 -5326.48 -71.96 -5370.46 -71.70 -5414.37 -71.50 -5458.10 -71.24 -5501.82 -70.46 -5545.94 -69.34 -5590.25 -68.30 -5634.34 -67.38 -5678.31 -66.58 -5722.08 -65.39 -5765.95 -63.58 -5810.08 -61.54 -5854.20 -59.42 -5898.23 -57.25 -5942.63 -55.09 -5987.60 -53.08 -6032.63 -51.28 -6077.57 -49.68 -6122.34 -47.92 -6166.96 -45.29 -6211.37 -42.11 -6255.63 -39.18 -6299.80 -35.80 -6343.75 -31.06 -6387.39 -25.53 -6430.84 -20.05 -6474.25 -13.73 -6517.32 -5.97 -6560.01 Total At displ Azim (ft) (deg) DLS (deg/ iOOf) Srvy tool type 5282.85 269.23 0.86 MWD M -- 5326.96 269.23 1.38 MWD M -- 5370.94 269.23 2.30 MWD M 5414.85 269.24 0.98 MWD M -- 5458.57 269.25 0.78 MWD M -- 5502.28 269.26 0.81 MWD M -- 5546.38 269.27 3.76 MWD M 5590.68 269.29 1.33 MWD M -- 5634.75 269.31 0.98 MWD M -- 5678.71 269.32 0.37 MWD M -- 1.89 3.48 0.90 0.21 0.94 5722.47 269.33 5766.32 269.35 5810.43 269.37 5854.52 269.40 5898.53 269.42 MWD M -- MWD M -- MWD M -- MWD M MWD M -- 5942.91 269.45 4.62 MWD M 5987.85 269.47 1.15 MWD M -- 6032.87 269.50 0.70 MWD M -- 6077.79 269.52 0.84 MWD M -- 6122.55 269.54 1.10 MWD M -- 6167.14 269.55 1.42 MWD M -- 6211.53 269.58 2.97 MWD M -- 6255.77 269.61 0.45 MWD M -- 6299.92 269.64 1.10 MWD M -- 6343.85 269.68 2.97 MWD M -- 6387.46 269.72 6430.89 269.77 6474.28 269.82 6517.33 269.88 6560.02 269.95 3.62 0.18 0.56 4.63 2.44 MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- Tool qual type [(c)1998 Anadrill IDEAL ID5 IA 12R] _ -- ANADRILL SCHLUMBERGER Survey Report 6-Dec-98 02:25:40 Page 8 of 9 Seq Measured Incl Azimuth Course % depth angle angle length - (ft) (deg) (deg) (ft) TVD depth (ft) 181 9550.00 60.33 283.7 50.00 6013.80 182 9600.00 60.14 284.5 50.00 6038.62 183 9650.00 59.97 287.9 50.00 6063.58 184 9700.00 60.03 289.1 50.00 6088.58 185 9750.00 59.83 291.3 50.00 6113.64 .286 9800.00 59.80 294.4 50.00 6138.78 ~!87 9850.00 60.13 297.5 50.00 6163.81 i88 9900.00 60.33 300.3 50.00 6188.64 189 9950.00 59.71 302.8 50.00 6213.63 190 10000.00 59.85 304.5 50.00 6238.80 191 10050.00 59.55 307.2 192 10100.00 59.71 308.3 193 10196.60 59.52 313.4 194 10292.14 59.83 316.0 195 10385.12 59.98 315.9 196 10478.29 60.04 316.1 197 10572.91 60.39 315.6 198 10667.79 60.63 314.7 199 10761.58 60.06 314.9 200 10855.76 59.09 313.6 201 10950.22 58.67 313.5 202 11040.73 58.84 312.9 [03 11134.14 58.82 314.0 204 11165.97 58.82 313.4 205 11260.32 60.25 316.3 50.00 50.00 96.60 95.50 93.00 93.20 94.60 94.90 93.80 94.20 94.40 90.50 93.40 31.90 94.30 31.30 30.90 34.80 30.50 30.40 206 11291.56 63.67 315.5 207 11322.46 67.16 316.0 208 11357.32 70.91 318.2 209 11387.78 74.72 319.1 210 11418.16 76.54 319.6 6264.03 6289.31 6338.19 6386.42 6433.05 6479.64 6526.63 6573.35 6619.76 6667.46 6716.25 6763.19 6811.54 6828.05 6875.87 6890.58 6903.44 6915.89 6924.90 6932.44 Vertical Displ Displ Total At DLS Srvy Tool section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (deg) i00f) type type 4529.65 4566.21 4603.53 4641.69 4680.41 4719.93 4760.39 4801.71 4843.51 4885.59 4927.98 4970.59 5053.45 5135.82 5216.28 5296.99 5379.08 5461.66 5543.12 5624.27 5704.96 5782.19 5861.98 5889.23 5970.46 5998.07 6026.16 6058.65 6087.77 6117.18 3.32 -6602.44 13.89 -6644.53 25.97 -6686.13 39.71 -6727.19 54.65 -6767.80 71.43 -6807.62 90.37 -6846.53 111.34 -6884.52 134.00 -6921.43 157.94 -6957.39 183.22 -6992.38 209.63 -7026.49 264.10 -7089.49 322.08 -7148.07 379.91 -7204.02 437.93 -7260.14 496.79 -7317.38 555.35 -7375.64 612.79 -7433.48 669.47 -7491.66 725.15 -7550.23 778.12 -7606.63 833.07 -7664.65 851.93 -7684.38 909.25 -7741.98 929.09 -7761.21 949.21 -7780.81 973.02 -7802.92 994.89 -7822.17 1017.23 -7841.35 6602.44 270.03 4.69 6644.55 270.12 1.44 6686.18 270.22 5.90 6727.31 270.34 2.08 6768.02 270.46 3.83 MWD M -- MWD M -- MWD M -- MWD M -- MWD M -- 6807.99 270.60 5.36 MWD M -- 6847.13 270.76 5.41 MWD M -- 6885.42 270.93 4.88 MWD M -- 6922.72 271.11 4.50 MWD M -- 6959.18 271.30 2.95 MWD M 6994.78 271.50 4.70 MWD M -- 7029.61 271.71 1.92 MWD M -- 7094.41 272.13 4.56 MWD M -- 7155.33 272.58 2.37 MWD M 7214.03 273.02 0.19 MWD M -- 7273.34 273.45 0.11 7334.23 273.88 0.52 7396.52 274.31 0.86 7458.70 274.71 0.64 7521.51 275.11 1.57 7584.97 275.49 0.45 7646.33 275.84 0.60 7709.79 276.20 1.01 7731.46 276.33 1.61 7795.19 276.70 3.05 7816.62 276.83 11.16 7838.50 276.96 11.39 7863.35 277.11 12.29 7885.18 277.25 12.81 7907.05 277.39 6.20 MWD M MWD M -- MWD M -- MWD M -- MWD M MWD M MWD M -- MWD M -- MWD M -- MWD MWD MWD MWD MWD MWD 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis [(c)1998 Anadrill IDEAL ID5 iA 12R] ANADRILL SCHLUMBERGER Survey Report 6-Dec-98 02:25:40 Page 9 of 9 Seq Measured Incl Azimuth Course % depth angle angle length - (ft) (deg) (deg) (ft) 211 11451.83 76.62 319.9 212 11484.03 78.20 317.8 213 11514.31 80.88 318.8 214 11548.58 84.61 319.8 215 11580.15 88.12 319.6 216 11610.15 90.55 318.7 ~17 11705.27 90.48 314.7 ~18 11800.70 91.27 314.1 219 11895.71 90.89 311.7 220 11991.53 89.55 313.2 221 12087.24 89.83 312.2 222 12183.94 89.62 311.4 223 12236.28 89.62 311.4 33.60 32.20 30.30 34.30 31.50 30.10 95.10 95.40 95.00 95.80 95.70 96.70 52.40 TVD depth 6940.24 6947.26 6952.76 6957.09 6959.08 6959.43 6958.58 6957.12 6955.33 6954.96 6955.48 6955.95 6956.29 Vertical Displ Displ Total At DLS Srvy Tool section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (deg) I00f) type type 6149.82 6181.22 6211.00 6244.99 6276.38 6306.44 6401.52 6496.83 6591.60 6687.13 6782.59 6878.93 6931.11 1042.17 -7862.47 1065.83 -7883.14 1088.08 -7902.96 1113.87 -7925.15 1137.84 -7945.47 1160.61 -7965.16 1229.80 -8030.36 1296.54 -8098.52 1361.19 -8168.09 1425.85 -8238.77 1490.75 -8309.10 1555.20 -8381.19 1589.85 -8420.49 7931.23 277.55 0.90 7954.87 277.70 8.04 7977.51 277.84 9.42 8003.04 278.00 11.25 8026.53 278.15 11.16 8049.27 278.29 8.61 8123.99 278.71 4.21 8201.65 279.10 1.04 8280.73 279.46 2.56 8361.25 279.82 2.10 8441.77 280.17 1.09 8524.26 280.51 0.86 8569.27 280.69 0.00 MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD M -- 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis -- [(c)1998 Anadrill IDEAL ID5 iA 12RI -- -- Re,:-F-34i Gas Injection Subject: Re: F-84i Gas Injection Date: Men, 28 Jun 1999 15:55:53 -0800 From: Blair Wondzell <Blair_Wondzell~admin.state.ak.us> Organization: SOA-AOGCC To: "Cooper, Katrina N" <CooperKN@BP.com> Trina Cooper, I reviewed the approved 10-403 which requested approval to continue injection into this "Water & Gas Injector". Your request was approved, with some conditions on monitoring, but no restrictions on type of injection; therefore you have approval to inject water or gas into MPU F-84i. Blair Wondzell, 6/28/99 "Cooper, Katrina N" wrote: > > Mr. Wondzell, > > We recently received approval of a form 10-403 (approval number 399-088) > variance request to continue injecting into Milne Point Well F-84i. The > well has 7" casing integrity; however, it has a leak between the tubing and > inner annulus. The 10-403 classified the service of the well as a "water > and gas injector" Can you confirm that we have the approval to inject gas > into F-84i in addition to just using it as a water injector. > > Thank you, > Trina > > Trina Cooper > Milne Point Production Engineer > *cooperkn@bp. corn > *wk: 907-564-4212 > *hm: 907-373-2667 > *cell: 907-232-2652 1 of 1 6/28/99 3:56 PM STATE OF ALASKA ALAsKA'01L AND GAS CONSERVATION CO~fMISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: []Abandon [] Suspend [] Plugging []Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing ~r, Vadance [] Other [] Change Approved Program []Operation Shutdown [] Re-Enter Suspended Well [] Stimulate 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of well: [] Development I--1 Exploratory [] Stratigraphic [~Service 4. Location of well at surface 2040' NSL, 2976' WEL, SEC. 6, T13N, R10E, UM At top of productive interval 2973' NSL, 303' WEL, SEC. 2, T13N, R9E, UM At effective depth 3119' NSL, 433' WEL, SEC. 2, T13N, R9E, UM At total depth 3630' NSL, 958' WEL, SEC. 2, T13N, R9E, UM 6. Datum Elevation (DF or KB) KBE= 44.08' 7. Unit or Property Name Milne Point Unit 8. Well Number MPF-84 9. Permit Number 98-226 10. APl Number 50-029-22931-00 1. Field and Pool Milne Point Unit / Kuparuk River Sands 12. Present well condition summary Totaldepth: measured 12236' feet Plugs (measured) true vertical 6956 feet Effective depth: measured 11502 feet Junk(measured) true vertical 6951 feet Casing Length Size Cemented Structural Conductor 112' 20" 250 sx Arcticset I (Approx) Surface 5797 9-5/8" 1300 sx PF 'E;, 330 sx 'G', 170 sx PF Intermediate Production 11219' 7" 165 sx Class 'G' Liner 438' 4-1/2 80 sx Class 'G' MD TVD 112' 112' 5833' 4286' 11252' 6872' 11112'-11550' 6800'-6957' Perforation depth: measured 11298' -11500' true vertical 6893'-6950' Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80, NSCT to 11119' ORIGINAL Packers and SSSV (type and measured depth) 7' Baker S-3 packer @ 11091' 13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch 14. Estimated date for commencing operation 16. If proposal was verbally approved Blair Wondzell Name of al)prover Contact Engineer Name/Number. Katrina Cooper, 564-4212 5/17/99 Date approved 15. Status of well classifications as: [] Oil [] Gas [] Suspended Service Water & Gas Injector Prepared By Name/Number: Michael Williams, 564-4657 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed '~-~ ~/7~-~0 Title Production Engineer Kntrinn Cnnn~.r Commission Use Only Date Conditions of Approval: Notify Commission so representative may witness I Approval Plug integrity .__ BOP Test ~ Location clearance ~ Mechanical Integrity Test Subsequent form required 10- Z, ~fr'/t,t (Ts ¢,,tc[ ~t'~/ Original Signed By -~ ~ p¢~, David W. Johnston ..~,.,..,.v~a copy ~ Approved by order of the Commission .... .n~ Commissioner Date Form 10-403 Rev. 06115188 ~~ Submit In Triplicate _ MPF-84 Request for Variance Well MPF-84, a water and gas injection well, has a leak in the tubing based on an MIT performed on 5/13/99. The well tested good when the tubing and inner annulus were pressured up together. This confirms that the packer is holding and the well has 7" integrity. Pressuring up on just the tubing demonstrated that there is a leak between the tubing and the 3-1/2" x 7" inner annulus. The communication is a small leak of approximately 100 psi per hour. We believe that it will not be possible to effectively locate and repair such a small leak. It is requested that a variance be granted to allow the well to continue to be used as an injector. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test OPERATOR: BPX(A) FIELD / UNIT / PAD: Kuparuk/Milne Point/ DATE: 5/13/99 WELL: i I *s I ~1~ ANNULUS COMMENTS: pACKER TVD 11,090 ~ ~' cASING TBG TEST ii :~siZE!:WT/GRADE i SiZE 17./26#/L_80 [ :~I~I 0PRESS PRETEST csO PRESs ~00 1~0 START TIME TBG CSG .PRESS 3, 850 15 MIN TIME TBGI CSG ~ ~.~ss, 3, 700 400 500 520 30 MIN T~MEI TaG cSG .:.ESS 3, 670 Plug set in XN nipple at 11,105--pressure up 3.5 tubing and monitored annulus pressure F-84i COMMENTS: COMMENTS: 4,400 4,400 4,400 o &890 &890 &890 4,400 3,900 Pressure up on tubing and annulus and monitor both/Passed 7" casing and packer test. I~ I~ I °;-;' I I ,,~-~o I . 1'.'o I I J II COMMENTS: COMMENTS: II *TUBING INJECTION FLUID: P = PRODUCED WATER INJ. S = SALT WATER INJ M - MISCIBLE INJ. I= INJECTION N = NOT INJECTING Distribution: orig - Well File c - Operator c - Database c - Trip Rpt File c - Inspector ANNULAR FLUID: DIESEL GLYCOL SALT WATER DRILLING MUD OTHER P.P.G. Grad, 0.00 o. o0 0.00 0.00 AOGCC REP SIGNATURE OPERATOR REP SIGNATURE F-84i tubing integrity.xls WELL TEST: Initial 4 - Year Workover Other M O'Mafley Weft ops/RC Shipley OI Advisor FI-051 (Rev. 3/93) Tree: Cameron 3 1/8", 5M Wellhead: FMC 11" x 7-1/16" 5M, Gen. 5a w/6" x 3.5" FMC Tbg. Hnr. w/3.5' eue threads top and btm. 3" CIW H BPV profile ivlPU F-84i 20" 91.1 ppf, H-40 J .:112' KOP @ 400 to 4,200' Max. hole angle = 90 deg. 60 - 64 deg. 4,300' - 11,300" Hole angle thru' perfs =-91 deg. Horizontal sec. 11,300'-12,236' 9 5/8", 40 / 47 ppf, L-80 Btrc. I 40# 4,186'-5,833' / 47¢t-4,186'- 35' Orig. DF El6 .... .. 44.08' (N 27E) Orig. GL Elev. = 11.90' RT To Tbg. Spool = (N 27E) 9 5/8" Howco 'ES' Cementer 12111' md I 3.5" HES X-Nipple ( 2.813" id )! 2,222' I 7" 29 ppf, L-80, Hydrill 563 casing ( drift ID: 6.184", cap.: 0.0371 bpf) 3.5" 9.3 ppf, L-80 NSCT tubing (cap. = 0.0087 bpf, drift = 2.867") Two 7"x 20' short joints at 10,613' to 10,653' md 3.'5" HES X-Nipple ( 2.813" id ) ,041' 7'x 3.5" Baker S-3 Perm. pkr. I 11,090' Perforation Summary Ref log: CDR/GST/IMP 11/21/98 Sizel spfI Interval (TVD) 2-7/81 4 111,298'-11,500' 6,903'-6,950' 15.2 gm Tubing conveyed (0.29" EHD, TTP = 20.57") 34J UJ RDX charges @ 60 deg. phasing, -3.5" HES XN-Nipple I I 1 1, 1 O5' 2.813"pkg. bore / 2.750" min. id I I WLEG 111,118'1 7"x 5" Baker ZXP Liner pkr. 2' Baker"HMC" hyd. Liner hng. 111,11 ] 7" float collar 7":float shoe 11,166' 11,252' . . 4.5" 12.6 ppf, L-80, BTC - Mod Liner ( drift ID = 3.958", cap. = 0.0152 bpf) 4.5" Landing Collar (PBTD) 4.5" float collar 4.5" float shoe 11,502' md 11,524' md 11,550' md DATE 12/11/98 REV. BY MDO COMMENTS Cased hole & ESP completion 27E 03/20/99 MDO Convert Producer into a injector 4es MILNE POINT UNIT WELL No.' F-84 APl · 50-029-22931 BP. EXPLORATION · Alaska hared ervices rilling To: Blair Wondzell, AOGCC From: Justin Balkenbush, Operations Driiling Engineer Date: December 7, 1998 Subject: Modification of MP F-84 Well Plan, Permit 98-226 The following sequence of events caused a revision to the original well plan for well MP F-84: · , ! ! , While drilling the 6" horizontal section to the toe of the planned "heel--toe" completion, an unmapped fault was crossed at _+ 11,600' sending the BHA from the Kuparuk A1 sand into an unknown Shale section. An attempt to drill the well as planned through this unknown shale section was made-- total TD reached was 12,232' MD, but during a wiper trip the drill string became stuck near the start of the fault (11,630') and would not come free. After jarring for -- 15 hrs, the string came free and was POOH to the surface. At surface it was discovered the Inclination At Bit (lAB) sub and bit were left in the hole. SSD and the WNS asset reviewed options at this point and decided to forgo a fishing/sidetrack option and complete only the "heel" portion of the well. A wiper trip was run to planned TD of the well (11,520'), a high viscosity piti was spotted and the string was POOH. 6. Plan forward is to run a 4 Y2" liner to 11,520' perforate and complete the well. TONY KNOWLES, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 November 9, 1998 Chuck Mallarv Drilling Engineering Supervisor, Acting BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Rc: Milnc Point Unit MPF-84 BP Exploration (Alaska), Inc. Permit No: 98-226 Sur Loc: 2040'NSL. 2976'WEL, SEC 06, T13N. R10E. UM Btmholc Loc. 1019'NSL 3475'WEL. SEC 35. T14N. R09E. UM Dear Mr. Mallarx': Enclosed is the approved application for permit to drill the above referenced well. The pcrmit to drill docs not cxcmpt you from obtaining additional permits rcquircd by law from othcr governmcntal agencies, and docs not authorize conducting drilling operations until all other rcquircd permitting dctcrminations arc made. Blowout prevention cquipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficicnt notice (approximately' 24 hours) must be given to allow a rcprcscntativc of the Commission to witness a tcst of BOPE installed prior to drilling new hole. Notice may be given ~ ~ctrolcum field inspector on the North Slope pager at 659-3607. ~i drmWal~ Joh~ ~ BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish &Gamc, Habitat Section w/o cncl. Departmcnt of Environmcntal Conservation w/o encl. .... ' STATE OF ALASKA ALASKA ~JIL AND GAS CONSERVATION COk,,,.llSSlON PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] Deepen [] Service [] Development Gas []Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE = 43.8' Milne Point Unit / Kuparuk River 3. Address 6. Property Designation Sands P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 355018 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 2040' NSL, 2976' WEL, SEC. 6, T13N, R10E, UM Milne Point Unit At top of productive interval 8. Well Number Number 2S100302630-277 2936' NSL, 321' WEL, SEC. 2, T13N, R9E, UM MPF-84 At total depth 9. Approximate spud date Amount $200,000.00 1019' NSL, 3475' WEL, SEC. 35, T14N, R9E, UM 11/12/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 388235, 1019'I No Close Approach 5083 15852' MD / 6948' TVD 16. To be completed for deviated wells 17. Anticipated pressure [see 20 AAC 25.035 (e) (2)} Kick Off Depth 400' Maximum Hole Angle 9o° Maximum surface 1100 psig, At total depth (TVD) 6923' / 1793 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 24" 20" 91.1# H-40 Weld 80' 32' 32' 112' 112' _)50 sx Arcticset I (Approx.) ... 12-1/4" 9-5/8" 40# L-80 BOSS 6192' 31' 31' 6223' 4325' 1465 sx PF 'E', 340 sx 'G', 170 sx PF 'C' 8-1/2" 7" 26# L-80 Hydril 563 11166' 30' 30' 11196' 6868' 110 sx Class 'G' 6" 4-1/2" 12.6# L-80 Butt 4902' 10950' 6758' 15852' 6904' 375 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate ~irn°edrU cti° n RECEIVED ORIGINAL oCT 29 1998 Perforation depth: measured Aias.~ 0il & Gas Cons, true vertical Anshofacj-e 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Tom Maunder, 564-4429 Prepared By Name/Number: Kathy Campoamor, 564-5122 21. I hereby certify that the. fo.r~g is tru.¢ crc correct to the best of my knowledge Signed X// ~/' (/~/~ x f~/¢.,_ / / Chuck Mallary (~,..~..,.?,-I'~'---~¢~'' '~f Title Drilling Engineering Supervisor, Acting Date [0 ~ Commission Use Only Permit Number I APl Number''-~' I ADDrovallDate I See cover letter ¢~-, .~._.~' J 50-~ ~-- ~'- ~- .~- ~ c,~ / l'/JC) JC;)% for other requirements Conditions of Approval: Samples Required []Yes J~ No Mud Log Required ~ []Yes J~]No Hydrogen Sulfide Measures []Yes ~No Directional Survey Required ~Yes [] No Required Working Pressure for DOPE []2M; [~M; [~]5M; F"110M; I-] 15M Other: by order of Approved By Origina! SJgEBd J3y Oommissioner the commission Date i)licate Form 10-401 Rev. 12-01-85 0avid W, Johnston Submit STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.005 !la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI [] Service [] Development Gas []Single Zone [] Multiple Zone 2. Name of Operator !5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE = 43.8' Milne Point Unit / Kuparuk River 3. Address 6. Property Designation Sands P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 355018 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 2040' NSL, 2976' WEL, SEC. 6, T13N, R10E, UM Milne Point Unit At top of productive interval 8. Well Number Number 2St00302630-277 2936' NSL, 321' WEL, SEC. 2, T13N, R9E, UM MPF-84 At total depth 9. Approximate spud date Amount $200,000.00 1019' NSL, 3475' WEL, SEC. 35, T14N, R9E, UM 11/12/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 388235, 1019'I No Close Approach 5083 15852' MD / 6948' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 400' Maximum Hole Angle 90° Maximum surface 1100 psig, At total depth (TVD) 6923' / 1793 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 24" 20" 91.1# H-40 Weld 80' 32' 32' 112' 112' 250 sx Arcticset I (Approx.) 12-1/4" 9-5/8" 40# L-80 BOSS 6192' 31' 31' 6223' 4325' 1465 sx PF 'E', 340 sx 'G', 170 sx PF 'C' 8-1/2" 7" 26# L-80 Hydril 563 11166' 30' 30' 11196' 6868' 110 sx Class 'G' 6" 4-1/2" 12.6# L-80 Butt 4902' 10950' 6758' 15852' 6904' 375 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate Production Lin ar Perforation depth: measured true vertical 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Tom Maunder, 564-4429 Prepared By Name/Number: Kathy Campoamor, 564-5122 21' I herebycertifythat/~Tf°'r'egDiog is tru'c¢?d c°rrectt°the best °f mY kn°wledgesigned / ~' ~~ Ch,ck Ma,,a~y ~._../--~-(--' '- '"' --iJ Title Drilling Engineering Supervisor, Acting Date (~ Commission Use Only I Permit Number APl Number _ _ Apprqval~Da~ ~ I See cover letter 900-..~2.~ 50-0.~_.¢-- '~-'~- ¢'~/ ll-t~-~, forotherrequirements Conditions of Approval: Samples Required E]Yes ]~No Mud Log Required I--lYes r~No Hydrogen Sulfide Measures []Yes ~]No Directional Survey Required .~Yes []No Required Working Pressure for BOPE i--]2M; J~3M; I-ISM; E]10M; [~]15M Other: Approved By Shared Services Drilling Contact: I Well Name: Type of Well (producer or iniector): Tom Maunder IMP F-84 Well Plan Summary 564-4429 I Kuparuk Horizontal Producer Surface Location: 2040' NSL, 2976' WEL, Sec. 06, T13N ,R10E, UM., AK Target Kuparuk 2936' NSL, 321' WEL, Sec. 02, T13N, R09E, UM., AK Bottom Hole Location: 1019' NSL, 3475' WEL, Sec. 35, T14N, R09E, UM., AK I AFE Number: 1337145 Rig: I Nabors 27-E Estimated Start Date: I 12 Nov. 98 I I Operating days to complete: : I MD: ll 5,852' I I TVD: ] 6,948' Bkb I IKBE: 131 143.8' Well Design: Ultra Slim Hole Liner Horizontal Well I 9-5/8", 40# surface, 7", 26# Intermediate, 1 4-1/2", 12.6# Liner Formation Markers: Formation Tops MD TVD (ss) EMW Formation Pressure Base Permafrost 1902 1800 8.4 ppg 786 psi NA Top Schrader Bluff 5493 3910 8.4 ppg 1708 psi OB Base Schrader Bluff 6023 4180 8.4 ppg 1826 psi Top HRZ 10277 6365 8.4 ppg 2780 psi Base HRZ 10466 6460 8.4 ppg 2822 psi MK-19 10626 6540 8.4 ppg 2857 psi TKD 10926 6690 9.1 ppg 3165 psi TKB 11186 6820 5.0 ppg 1773 psi TKA 11216 6835 5.0 ppg 1777 psi TKA3/Target 11227 6840 5.0 ppg 1779 psi TKA2 11261 6855 5.0 ppg 1784 psi TKA1 11330 6880 5.0 ppg 1793 psi Miluveach Not Reached 6940 : NA NA Total Depth 15852+ 6904+ 5.0 ppg 1793 psi · *These are estimated maximum pressures and the actual pressures may be lower. Casing/Tub ing Program: Hole ~;ize Csg~ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/TVD MD/TVD 24" 20" 91.1# H-40 Weld 80 32/32 112/112 12 1/4" 9-5/8" 40# L-80 BOSS 6,192 31/31 6,223/4,325 8-1/2" 7" 26# L-80 Hyd ril 11,166 30/30 11,196/6,868 563 6" 4-1/2" 12.6# L-80 Butt 4,902 10,950/6,758 15,852/6,904 The internal /ield pressure of the 7" 29# casing is 8,160 psi. The deepest anticipated gas should occur no deeper than the oil water contact which is expected below the TKA1 at -+ 6,923 TVDbkb In this instance, this worst case surface pressure would occur with a full column of gas from the reservoir from a depth of _+6,923 TVDbkb. The maximum anticipated surface pressure in this case assuming a reservoir pressure of 1,793 psi is 1,100 psi using a 0.1 psi/ft gas gradient, well below the internal yield pressure rating of the 7" casing. PAGE 1 TEM 10/29/9811:26 AM Cementin¢ )rogram: Halliburton Cementin¢ Services Hole Casing Interval & Volume~ Spacer Type of Cement Propertiesz Cate~lory Size/Depth Excess Surface Lead4 Lead Lead Lead First Stage 9-5/8" @ 2,100-5,000' 480 sx 70 bbls Permafrost "E" Den 12.0 ppg 6,223' @ 15% 186 bbls Fresh water Yield 2.17 ft 3/sx excess Water 11.63 gps TT 4.0 hrs 5,000-6,223' Tail5 Tail Tail @ 0% 340 sx Premium Class "G" w/ Den 15.8 ppg excess 69 bbls 0.2 % CaCI, 0.15 #/sk Floceele Yield 1.15 ft 3/sx Water 4.9 gps TT 4.0 hrs Second Staqe Leadb Lead Lead Lead Stage collar° @ 0-1,950' 985 sx 75 bbls Permafrost"E" Den 12.0 ppg 2,100' @ 250% 381 bbls Fresh water Yield 2.17 ft 3/sx excess Water 11.63 gps TT 4.0 hrs Tail5 1,950'-2,100' 170 sx Tail Tail @ 250% 29 bbls Permafrost "C" Den 15.6 ppg excess Yield 0.96 ft 3/sx Water 3.65 gps TT 4.0 hrs Intermediate 7" @ 10,196- 110 sx 70 bbls. Premium Class "G' w/ Den 15.8 ppg First Stage 11,196' 11,196' 23 bbls NSCl Spacer 0.2 % CFR-3 Yield 1.15 ft 3/sx 0.1% HR-5 Water 5.0 gps 0.45% Halad 344 TT 3.5-4.5 hrs @140° F FL 50cc/30 men @140° F Liner 4-1/2" @ 10,950- 375 sx ~ 40 bbls. Premium Class "G" w/ Den 15.8 ppg 15,852' 15,852' 77 bbls NSCI Spacer 0.2 % CFR-3 Yield 1.15 ft 3/sx 0.1% HR-5 Water 5.0 gps 0.45% Halad 344 TT 3.5-4.5 hrs @ 140° F FL 50cc/30 men @140° F Volumes may be rounded. Ensure thickening times are adequate relative to pumping job requirement. Actual times should be based on job requirements and lab tests. Perform lab tests on mixed cements, spacers and mud's to ensure compatibility prior to pumping job. 3. A Type H ES Cementer will be installed in the 9-5/8" csg. 200' md below the base of the Permafrost at 2,100'MD+ 4. The calculated first stage lead is designed to fill from the 9-5/8* ES Cementer at 2.100' md to 5,000' md which is 500'+ above the shoe plus 15% Excess. 5. The calculated first stage tail cement volume is designed to fill from 500' md above the shoe to surface TD at 6,223' md (4,325 TVD bkb) plus 0% open hole excess and 80' 9-5/8", 40# casing shoe joint volume. 6. The surface hole Second Stage Lead Cement Volume covers the interval from 0-1.950' md The designed second stage lead cement volume includes 250% open hole excess.. 7. The surface hole Second Stage Tail Cement Volume covers the interval from 1,950-2,100' md The calculated second stage tail cement volume includes 250% open hole excess. 8. Install one(l) Bow Spring Centralizers per joint on the bottom 10 joints of 9-5/8" casing (required). 9. The intermediate hole cement is designed to cover the interval from 10,176' md (1000'+ above the shoe) to TD at 11,176' plus 30% open hole excess and the shoe joint volume of 80' md of 7", 26# casing. 10. Use 7" x 8-1/4" Straight Blade Rigid Centralizers and install one per joint from above the float collar to 500' above the shoe. Use two centralizers per joint on the shoe joints. 11. Install two 7" marker joints and position 350' above TD. 12. Place all centralizers in middle of joints using stop collars. 13. Liner cement volume based on gauge hole plus 20% XS and 200' of fill above TOL~ 14. Mix surface cement slurries on the fly. Mixing style for the intermediate and and liner slurries is being evaluated. PAGE 2 TEM 11:26 AM 10/29/98 Logging/Formation Evaluation Proqram: Anadrill Schlumberqer Surface-12-1/4" 1. MWD/LV~D D&I / GR / DWOB / DTQE from spud to TD of surface hole, real time & recorded 9-5/8"/7" Cased Hole 1. NA. No cased hole logs planned for side track Intermediate-8-1/2" 1. MWD/LWD D& I/C DR/G R/PWD/DWOB/DTQE All logs required from drill out of 9-5/8" to TD, real time and recorded. Production-6" 1. MWD/LWD D&l/Vision 475/DWOB/DTQE Mud Logging 1. Schlumberger IDEAL System in all hole sizes. SPIN Log: Record: GR, Depth, Surface Torque and DWOB/DTOQ, ROP, Hook Load, RPM, Pump Pressure, GPM (in and out) during all operations. Loq_qin.q Nomenclature M10 PowerPlus DWOB/DTQE: GR: CDR: ADN: ROP: PWD Directional Inclination and Azimuth' Downhole weight on bit and torque Gamma Ray Compensated Dual Resitivity Azimuthal Density Neutron (Density, Porosity, and Sonic Caliper) Rate of penetration Pressure While Drilling Mud Program: Baroid Drilling Fluids Inc. Surface Mud Properties: LSND Freshwater Mud Density Marsh Yield 10 sec 10 min pH Fluid Solids (PPG) Viscosity Point gel gel Loss % 8.6-9.6 50-150 15-35 8-15 10-30 9-10 8-15 <9 Intermediate Mud Properties to 7" TD LSND Freshwater Mud Density Marsh Yield 10 sec 10 min pH APl HTHP Solids (PPG) Viscosity Point gel gel Filtrate %LGS 8.6-9.6 35-45 6-20 3-10 7-20 8.5-9.5 6-12 NC <6 4-6 <10 HRZ Production Mud Properties from 7" Csg. QuikDriI-N (Solids Free) Pt. to TD. Density LSR LSR 10 sec 10 min pH APl HTHP Solids (PPG) Viscosity YP ~lel ~tel Filtrate %LGS 8.8 >30,000 8-16 8.5-9.0 NC <6 Well Control: Well control equipment consisting of 5000 psi working pressure pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. The diverter, BOPE and drilling fluid system schematics are on file with AOGCC. PAGE 3 TEM 11:26 AM 10/29/98 Directional: KOP1 Tangent Hole Angle Final Build to Land Well Maximum Hole Angle Close Approach Wells Survey Program 400' Start Variable @ 1.0°- 2.5°/100 to 59.42° inc. and 269.5° az. EOB @ 3,227' 59.42-60.0° from 3,227-11,206' md 10.0°/100 from 60° to 89.4° EOB 11,500' md 89-90° from 11,500-15,852'. All wells may remain flowing while drilling F-84 and no shut-ins are required. 1. Surface to 6,223' MWD surveys. 2. 6,223'-TD MWD surveys. Disposal: No "Drilling Wastes" will be injected or disposed into F-84 while drilling this well. Cuttinqs Handlinq: Cuttings should be hauled to the ball mill at CC-2A. The Milne Point reserve pit can be opened in emergencies by notifying Karen Thomas (564-4305) with request. Fluids Handlinq: All drilling wastes will be hauled off and disposed of in accordance with pertinent rules and regulations. GENERAL DISCUSSION Well Obiective: MPU F-84 is planned as a horizontal Kuparuk River A Sand producer tapping the fault block that L-28 originally targeted. The target section is generally southwest of F-Pad. The horizontal section is oriented SE to NW. TD is planned at 15,852' with a final departure of 10,604'. The well is designed with over 4600' of 6" horizontal hole. The surface casing will be set below the Schrader Bluff at 6,223' (4,325' TVD bkb). An 8-1/2" hole will be directionally drilled to land the 7" casing at 60° inc. above the Kuparuk B at 11,196' md. After setting 7" intermediate casing the angle will be increased to near horizontal through the Kuparuk A series. Geoloq¥ Well MPF-84 is planned as a horizontal producer in the updip portion of hydraulic unit 290. This well is proposed based on the reservoir information from L-28, L-39, and L-40 and interpretation of recently acquired seismic data of unit 290 and Tract 22. This new information gives confidence that additional reservoir volume exist further updip in the targeted fault block. Due to the problems encountered on L-28, the horizontal section of F-84 is intended to access the L-28 target as well as the additional reservoir area updip. DRILLING HAZARDS AND RISKS SUMMARY: Formation pressures are expected to be Iow in this partially drained fault block. Reservoir pressure is estimated at 1777 psi at 6878' tvd, (5.0 ppg EMW) in the Kuparuk formation. To provide isolation for the long Iow pressured reservoir section, a 7" intermediate casing string will be top set above the Kuparuk B. the central portion of the target may be faulted. Wellbore stability may be affected by any faulting. Close Approaches There are surface approaches associated with the drilling of MP F-84, however, tolerance lines will be carefully monitored and deviations from the proposed well path minimized. Water, Gas and WAG Iniection This is a partially depleted fault block with reservoir pressures estimated at 5.0 ppg EMW. Annular Injection Currently annular injection is not permitted on F-Pad. PAGE 4 TEM 11:26 AM 10/29/98 Lost Circulation: Lost circulation is prevalent while running casing and cementing in the surface but also occurs in the production hole. Losses are extremely probable while cementing the production casing. Losses have been experienced while drilling the 12-1/4" surface and while circulating to condition mud before, while and after running surface casing to bottom. Major losses have also occurred while cementing the production casing. In many instances, the losses were minimized by reducing swab and surge pressures, minimizing mud weight and conditioning the mud before cementing. Contingencies have been incorporated to well program remedy loses if encountered. Mud weights will be maintained between 9.1-9.4 ppg down to the D shale. With the Iow reservoir pressure expected, lost circulation is possible. This should be minimized due to the viscosity of the Quik-Dril N. The other lost circulation risk is when intra-reservoir faults are crossed. Stuck Pipe Potential: Differential sticking concerns can exist in the surface i~terval with the Schrader Bluff sands and others exposed. Normal precautions should be employed. Differential sticking concerns are reduced in the intermediate interval since the Schrader sands will be cased off. Although reduced, good practices should be followed to avoid sticking mishaps. Employ the PWD data to gauge hole cleaning effectiveness. The lower reservoir pressure of the production section can effect stuck pipe potential. Employing the drill in fluid chosen should help reduce sticking potential. Again, strict attention to the pipe movement parameters while drilling must be maintained. Formation Pressure: KUPARUK A1 SAND 6,923' TVDss 1,793 PSI 5.0 PPG EMW Formation pressures are expected to be Iow and the pore pressure is estimated at 5.0 ppg EMW. The deepest anticipated gas should occur no deeper than the oil water contact which is expected below the TKA1 at _+ 6,923' TVDss. In this instance, this worst case surface pressure would occur with a full column of gas from the reservoir from a depth of __.6,923' TVDbkb. The maximum anticipated surface pressure in this case assuming a reservoir pressure of 1,793 psi is 1,100 psi. See the updated Milne Point F-Pad Data Sheet prepared by Pete Van Dusen for information on F pad and review recent wells drilled on F Pad. PAGE 5 TEM 11:26 AM 10/29/98 MP F-84 Kuparuk Horizontal Producer Summary of Proposed Operations . . , 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. Drill and Set 20" Conductor. Weld an FMC landing ring for an FMC Gen 5 Well head on conductor as well as a nipple to aid in performing potential well head stability cement job. Prepare location for rig move. MIRU Nabors 27E drilling rig. NU and test 20" Diverter system. Ensure the diverter is as per AOGCC specifications and is approved by an AOGCC supervisor. Build Spud Mud. Drill a 12-1/4" surface hole as per directional plan. Run Directional MWD/LWD (GR/DIR/DWOB/DTOQ) from surface to 12-1/4" TD. Run 9-5/8" casing. Space out ES Type H Cementer to 2,100' md. Perform Two Stage Cement Job. Complete the surface casing cementing check list. ND 20" Diverter, NU and Test 13-5/8" BOP MU a PDC bit on an extended power section medium speed motor, with Directional MWD and LWD (GR/DIR/CDR/DWOB/DTOQ/PWD). RIH, Drill out Float Equipment and 20' of new formation. Perform the FIT as per Recommended Practices Manual. Record pressure versus cumulative volume during the LOT test for the well file. Drill 8.5" hole to 7" TD as per directional plan. Use PWD information to assess hole cleaning. Observe for losses as mud weight is increased for shale stability in the lower hole section. Condition hole, short trip to surface casing, and TOH for casing. Run 7" casing. · Perform Single Stage Cement Job. Complete the production casing cementing check list. Displace cement with mud. Bump the plug and test casing to 3500 psig for 5 minutes. Bleed off pressure and check floats. Break off BOPE, install 7" packoff and NU tubing spool. . --. NU BOPE including 11" x 13-5/8" DSA. Be aware of BOP height increase. Notify AOGCC inspector 24 hours in advance of BOP test. LD previous drilling assembly if necessary. PU 3-1/2" or 4" DP. MU drilling BHA. Tag float collar and pressure test casing to 3500 psi. Drill out float equipment, clean rat hole, and drill 20' of new formation. Pick up into casing, while continuing to circulate at drilling rate. Monitor well for any losses. This procedure will accomplish a drill out FIT. Displace old mud with fresh drill in fluid. When the displacement is finished, drill ahead per the directional plan. At TD, circulate and condition the well for the liner. PAGE 6 TEM 11:26 AM 10/29/98 24. 25. 26. 27. 28. 29. 30. 31. 32. NOTE: DETAILED COMPLETION PROCEDURE WILL BE SUBMITTED IN TER VA L S A RE SEL EC TED. TOH and LD BHA. PU and run 4-1/2" liner. Condition well on bottom and prepare for cementing. Reciprocate liner. Cement per program. Displace cement with perforating pill. Set liner hanger and liner top packer. Release from liner and clean up wellbore per liner procedure. Circulate well to treated sea water. TOH, LDDP, and tools. Freeze protect well from 2200' to surface with diesel. ND BOP and NU dry hole tree. Test tree to 5000 p, si. RDMO Nabors 27E. Freeze protect 9-5/8" x 7" annulus to 2200' with crude oil. THIS WELL MAY BE COMPLETED WITH 27E. THE WORI(OVER PROGRAM WITH A ONCE THE PERFORATION PAGE 7 TEM 11:26 AM 10/29/98 Anadrill Schlumberger Alaska District t940 Arctic Blvd. Anchorage, AK 99503 (907) 273~1700 Pax 561~8537 DIRECTIONAL WELL PLAN for SHARED SERVICES DRILLING ~eL1 ......... : MPF-84 (P2A) Field ........ : Milne Po£n~ Coc~utatioa..: Minimum Curvature Units ........ : Surface Lat..: 70.50788266 N Surface Long.: 149.65974678 W ts~al Description Surface ...... : 2040 FSL 2976 FEL S06 Targe~ Entry.: 2936 FSL 321 FEL Ta~fer~ MidPt: 4327 FSL 170L FEL S02 T13N Target ~xit..: 869 FSL 3342 FEL S37 T14N Rfl~E UM RHL .......... : 1019 FSL 3475 FEL S35 T14N RO~E LOCATIONS - ALASKA Zone: 4 X-Coord ¥-Coord 5¢1586.61 6035490.85 S33798.76 60363~7.19 532411.00 6037722.00 530761.00 60395A7.00 53062~.$$ 60~9~9S.94 STATrON MEASURED I~C'I.~ /OENT1FICATION DEPTH ANGLE KD 0,00 0.00 XO~ / BUILD 1/~00 400,00 0.00 500.00 1.00 IHIILO t,5/100 550:00 1.75 G00 O0 2.50 D~RECT~ON VE~TICAL-DEPTH,g AZ! M~TH TVD "S1/B - SEA ., 0.00 0.00 269.55 400.00 356.10 269,55 499.99 456,09 269.55 549.98 506.08 169.55 599.95 576,05 ~U~LO 2/~00 700 O0 750 O0 800.00 900.00 1000.00 6.50 269.55 699.75 655.85 5.50 269,55 749.5~ 705.66 6.50 269~SS 799.29 755,39 8.50 269,55 898.43 85~.53 I0.50 , 269.55 997.05 955.1~ 1100.00 12.50 269.55 1095.0{ 1051.14 DEPART 0.00 0.00 0.59 1.n.l 2.67 6.82 9.70 13.34 22,2~ 33.~4 46.99 Prepared ..... : 2B Sep 1998 Vert sect az.: 316.7~ KB elevation.: {3.90 ft Ma~netic Dcln: +27.369 Scale Factor.: 0.99990~96 Conver~ence..: +0.3~075~85 ! .~ K' ~ ;v.~iLL AKA-BPC ! ~ .'°1,1 ~.." %~ 11', j FEASt!.¢.!i.:_,!T¥ PLAN '. ,. i qoq" F,P : OVS. D E><ECIJTION ~RDI~AT~S-~H A~S~ ~ne ~ ~LLH~ X Y TOOL ~ACE mmm~ OL/ 0.00 N 0.00 E 543586.61 6035490.~$ 906 0.00 0.00 N 0.00 E 541586.61 6035490.~5 90L 0.00 0.Ol S 0.87 ~ 541585.$4 6035490.84 90L 0.02 S 2.07 W 541584.54 6055490.82 90L 0.03 S 3.93 W 541~82.68 6035490,80 90L 0.08 S 10.03 ~ $Q1776.58 6035490.72 906 2.00 0.1~ S 14.39 W ~41572.22 6035490.66 HS 2.00 0.15 S 19.6~ ~ 541~67.00 6035490.59 KS 2.00 0.25 S 32.67 ~ 541553.95 6035490-41 RS 2.00 0.38 S 49.17 ~ 541537.45 6035490.[9 HS 2.00 0.54 S 69.~0 ~ 5415i7.52 6035489.92 HS 2.00 Z 7 (Anadrtll (c)98 MPFB4P02 3.2C 3:55 PM P) ~ HPF-84 (F2A) 26 9ep i998 Page 2 PROPOSED HELL PROFILE STAT[ON MEASURED INCLI~ [DEigTIFICATION DEPTH ANGLE 1200.00 1¢.50 1300.00 ~6,50 1400.00 18,50 1500.00 20.50 1600.00 22.50 DIRECTXON VERT]iCAL- DE PT~{$ SECTION A~Z [MUTH TVD SUB -SEA DEPART 269.55 1192 .27 ~k48.37 62.87 269.55 1288 .63 ).244,73 Sl .04 ~69.55 1384 .O0 1340.).0 269.55 1478 .~6 1434.36 [24 .19 269 .55 L$71.29 159-7.39 ]49 .11 COORDX~AT~S-FRO~ AIJ%SKA Zone ~ TOOL DL/ ~ELL/{EAD X Y FACE 0.?~ S 92.45 W 54~494.~8 603548~.61 HS 2.00 0.93 $ 119.~7 W 54T467.46 6035489.25 KS ~.00 )..~6 S 149.~4 W $4).435.40 603~488.85 KS 2.00 [.42 S [8~.62 W 54).~04.02 6035485.40 HS 2.00 ~.71 S 219.26 ~ 54~6~,38 6035487.9~ HS ~.00 1900.00 24.50 ENTD 2/100 lBOO.O0 26.50 lB50.OO 27.50 ~U~LD 2.5/~00 Lg00.O0 27.50 P~E PEr. FROST 1901.98 27.50 269.55 L662.99 16L9.09 176.2~ 269.55 L753.25 1709.35 205.50 269.55 1797.80 L753.90 220.93 269,55 18~2.1~ ).798.25 236.63 269.55 18~3.90 LBO0,O0 23~.25 2.02 S 259.13 W 541327.52 6035487.38 HS 2.00 2.36 $ 302.18 W 541284.48 6O35486.BO HS 2.00 2.53 G 324.88 W 5~126~.78 6035486.50 H~ 2.00 2.7L $ 347.97 W 541135.70 6035486.19 HS 0.00 .. 1.72 S 348.$8 W 541237.79 6035486.18 H~ O.OO 2950.00 27..50 2O00.00 28.75 2100.00 31,25 2200.00 3~.75 2300.00 36.25 269.~5 1886.50 1842.60 252.33 269.55 1930.59 1886.69 268.36 269.55 2017.).9 1973.29 382.36 269.55 2101.52 20~7.62 338.89 269.55 2183.4~ 2139.53 377.90 2.89 $ 371.05 W $4L2L5.61 6035485.88 ~ 0.00 3.08 S 394.62 W 541192.05 6035%85.56 HS 2.50 3.~7 S 444.62 ~ $4).142.06 6035484.90 HS 2.50 3.89 S 498.3~ W 541088.35 6035484.18 HS 2.50 4.33 S ~55.69 ~ 541031.0~ 60354~.41 HS 2.50 2400.00 38.75 2500.00 41.25 2600.00 43.75 2700.00 46.25 2800.00 48.75 269.55 2262.$6 22L8.86 419.29 269.55 2339-.36 2295.46 463.00 269.55 24~3.08 1369.18 508.94 ~69.5~ 2483.78 2439.88 557.02 269.55 255~.34 2507.44 607.).5 4.8~ S 6~6.56 W 540970.~5 6035482.59 HS 2.50 5.3L S 680.83 W 540905.88 6035481.73 }tS 2.50 5,83 S 748.35 W 540838.34 6035480.83 HS 2.50 6.39 S 819.09 W 540767.65 6035479.88 HS 2.50 6,96 S 892,8[ W 540693.94 6035478.89 KS 2,50 2900.00 5L.25 3000.00 53.75 3100.00 56.25 3102.89 56.32 3200.00 58.75 3226.89 55.42 ~-s/8. cs<; PT <11> S49~.48 S9,42 SCH~U~DSR ~ 5492.48 59,42 (Anadrtll (C)98 [,]P!~84PO~ 3.2C 3:55 PM P 269.S5 2615.61 2571.7L 659.2~ 269.55 2676.48 2632.58 7L3.38 269.55 2?33.84 ~689.94 .~68.88 269.55 2735.44 2691.54 770.52 269.55 2787.56 2743.66 826.23 269'.55 2801,38 2757.48 841.92 269.55 3953.90 3910.00 2).68.33 ~69.55 3953.90 3910.00 2168.33 7.56 S 969.40 W 5406L7.36 6035477.87 HR 2.50 8.18 S 1048.73 W 540538.04 6035476.60 HR 2.50 8.81 $ 1130.64 W 540456.15 603547~.71 HS 2.5~ 8.83 S 1133.0¢ W 540453.75 6035~75.68 H$ 9.5~ 9.47 S 1214.97 W 548371.84 6O35474.58 HS 9.50 9.65 S 2.50 24.86 S 0.00 24.86 S 0.00 123~.03 ~ 540348.77 6035474.27 3188.5~ ~4 538398.60 6035448.15 3188.51 W 538398.60 6035448.~5 HS .A ~".i .'l :".";~ / CA ," ". I'% ', · ,,,. !.1. !.".'? ,~, c't :.:..:~ ' ..... : .... t3" V'E 1 A,'-D FOR E)< C i.J T tO N PROPOSED WELL PROPILR STATION ~EASURED [HCLI~ DIRECTION IDE~Tr?ICAT~ON DEPTH A/+GLE AZ/MUTH SCHRADER 60~3.2( 59.4~ 269.55 9046.99 59.42 269-55 CU~%~ 2.5/[00 9047.0~ 59.42 269.56 9100.00 59.13 251.37 9200.00 £~.64 274.83 9300.00 S8.25 ~98.32 9400.00 57.96 281,84 9500.00 57.76 285,37 9600.00 57.66 288.92 9700.00 57.66 292.47 9800.00 57.76 296,02 9900.00 57.96 299.55 [0000.00 58.25 303,07 [OlQ0,OO 59.64 306.56 ~02~0,00 59.13 310.02 TOP HRZ [0276,75 59.56 312.$5 ~0300,00 59.70 313.44 10346.09 60.00 S~,:[3 2.5/100 ~0346.~4 60,00 ~SE I{RZ 10466.29 60,00 3~5.00 MK-L9 106~6.29 60,00 3~5.00 10926/09 60,00 3~5.00 TKUD (k'I)P CAPROCK) 10926.29 60.00 3L5.00 7" CSG PT <~{> 11176.29 60.00 ~3P,a~RUK B 11186.29 60,00 3[5.00 11206 .09 60,00 315101] C UR~-E 10/100 11206.14 6(],0]. 31.5.8(I KUPAKUK A 11216.45 61,O4 3Z5.01 VERTICAL-DEPTHS TVD SUB-SEA mmmm~m=~ 4223.90 ~180.00 S762.11 5718.21 $762.13 5~18.23 5759-L9 57~$.29 5840.88 5796.98 SECTION COORD1NkTES-FRDM ALASKA Zone ¢ TOOL DL/ DEPART WEDI_~D X Y FACE 100 2479.07 28.42 S 3645.45 ~ 537941.74 60354%1.03 HS 0.00 4~49.36 48.7l S 6248.63 W 535338.96 6035407.16 101R 0.00 4249.39 48,72 S 6248.68 ~ 535338.99 6035407.~6 101R 3.00 4280.87 48.35 $ 6294.2~ ~ 535293.40 6035407.27 100R 3.00 43~2,84 43.73 $ 6379,67 W 535207.91 60354[1.42 95R 3.00 5893.22 ~849.32 4407,98 33.9B S 6464.30 W 59~6.07 590~.17 4476.09 19.L3 S 65~7.87 W 5999.29 $955.39 45~7.D~ 0.78 N 6630,15 W 6052.72 6008.82 4620.51 25.69 N 6710,9[ W 6306.23 6062.]3 4696.42 55.5~ N 6789,92 W 6~59.67 6L1~.77 6212.89 6L68.99 6265.74 622~.84 6318.08 627~.18 6369.76 6~25.86 6408.90 6365,00 6420.65 6376.75 6443.80 6399,90 6443.83 6399.93 6~03.90 6~60.00 6583.90 6540.00 6723.60 6689.90 6733.90 6690.00 6855.90 6815.00 6863.90 6820,00 (Anadrill (c398 MPFS~P02 3.2C 3:55 PM P) 6573.80 6829.90 6873.83 6829.93 6878.90 6835.00 535[23.23 6035420.69 97R 3.00 535039.59 6035435.07 95R 3.00 534957.21 603545~.52 93R 3.00 534576.32 603~¢78,98 9iR 3.00 534797.15 6035508.38 $9R 3,00 4374.52 90.25 N 6866.98 W 534719.91 6035542,65 8?R 3.00 4854.59 129.71 N 69%1.87 W 53464¢.81 6035581.69 85R 3.00 4936.43 173.82 N 7014.38 W £345?2,05 6035625,39 83R 3.00 5019.80 222.~7 ~ 7084.33 W 534501.85 60~5673.64 82R 3.00 5104.47 275.51 ~ 715[.51 W ~34434.38 6035726.30 80R 3.00 5170.20 319.11 N 720[.07 W 53~38~,$7 6035~69,62- 78R 3.00 5190.21 332.80 N 7215.73 ~ 53~369.84 6035783,22 ?SR 3.00 S230.03 360.59 N 7244.~9 N 534341,12 6035810.~5 RS 3.00 5230.07 360.63 N 7244.53 ~ 534341.09 6035810.59 HS 0.O0 S334.08 434,20 N 73k7.90 W 534267.L[ 6035884.04 HS 5479.58 532.18 N 74L5.88 W 534168.60 603598[.46 H~ 0.00 5732.10 715,77 N 7599.~7 W ~3984.00 6036164.00 H~ 0.00 5732.]7 7~5,89 N 7599.~9 ~ 533983.88 6~36164.12 HR 5948.68 868.99 N 7752.69 ~ 533829.94 6036316.34 H~ O.O0 S95$.34 875.1L H 7758.81 W 533823.79 6036322.43 HS 0.0O 5974.48 6974.52 5983,49 88~,24 N 7770.93 W 5338[[.60 6036334.48 1R 0.00 887.27 N 7770.9~ W 53381L.56 6036334.52 1R LD.00 893,6l N 7779.31 W 533805.18 6036340.83 1R 10.00 .) ,.".~;'. ~ ':. I" ? ', i.. A KA.[:~?.t-,1 Z H MPU-84 (P~A) 28 Sep 1998 Page ~ PROPOSED WELL PROFILE STATION ~d~ASURED INCLN IDENTrFZCAT[O~ DEl'TH ANGLE TARgeT ENTRY ~]~26.~$ 62.09 TKA3 11226.95 62.09 TKA2 11260.91 65.48 11300.00 69.39 TKAL 11330.6l 72.45 ~mmmmmm~ DIRECT[ON AZ ! MUTH 3[5.02 31fi.06 315.10 315.13 VERT[CA~-DEPT}{.9 TVD SUB-SEA 6883.90 6840.00 6683-90 6840.00 6898.9~ 6855.00 6~13.90 68~0,00 6923.90 688~.00 SECTION DEPART mmm~tmmn 6059.25 6055.16 COORDZNATES-FRO{~ A/3%$~C~ Zone ¢ T%70~ DL/ WELLHEAD ~ Y FACE 90~.14 N 7783.8& ~ 53379~,6~ 60~6347.3~ iR ~0.00 9~1.90 N 7805.36 ~ 533776.98 6036368.75 1R 947.26 N 7830,85 ~ 53375[.35 6036394.16 1R 10,00 967.75 N 7851.26 ~ 533730.83 6036414.5~ ~R 10.00 11400.00 39.39 ' 315,19 11500.00 39.39 3~5.27 11505.D0 89.89 335.28 11505.D5 89.89 315,28 13176.33 89.89 ~15,28 6940.77 6896.87 6155.40 6950.53 6906.63 6~54.79 6950,56 6906.66 6259-76 695~.56 6906,66 6259-81 6953,78 6909.88 7930.57 1015,44 N 7868.70 W 533653.1~ 6036461.96 HS 10.00 ~086,0~ N 7968.70 W 533612.74 603653~.5] HS 1~.00 ~089,$6 N 7972.21 ~ 533609.21 6036535.66 HS 10.00 1089,59 ~ 7972,25 W S33609.17 60365~5.69 HS O.0O 2277.05 N 9148,3L q 532426.66 60~7716.43 }-IS 0.00 CURVE o. s/xoo TARGET M[DPT 13176.3~ 89.89 13198.37 90.00 13198.49 90.00 13200.00 g0.00 13300.00 90.02 515,28 315,28 315,28 515,28 515.78 6953.78 6909.88 6953,80 6909.90 6953.80 6909.90 6953,80 6909.9U 6953,78 6909.88 7930.62 7952.60 7952.65 7954.23 805~.21 2277.08 N 9148.35 W S32426.56 60~7716.46 HS 0.50 9292.7~ N 9163.82 W ~324~1.00 6037?32.00 ~ 0.5O ~292.74 N 9163.86 W 532410.97 6037732,03 HS 0.00 9293.87 N 9164.97 W 532409.85 6037733,15 88R 0.50 ^ ,, 9365.23 N 9235.02 W 532339.41 6037804.1~ 88R 0.50 13400.00 90.0~ 13500.00 90.06 13600.00 90,88 13700.00 90.11 13800.00 90,]3 316 316 .28 .78 . ~8 ,78 6953.73 6909.83 ~15~.20 6953".63 6909.73 8254.20 6953.S0 6909.60 835~,20 6953,34 6909.4~ 845~,19 6953,13 6909.~3 8554.16 2{37.2I ~ 9304.44 W 532269.59 6037875.69 88R 0.50 2509.78 N 9373.23 W ~32200.40 6037947.85 88R 0.50 2582.96 N 944~.39 W ~32~31.84 6038020~66 88R 0.50 2656.~2 N 950~.9~ W ~32063.92 6038094.04 88R 0.50 2731.07 ~ 9575.78 W ~3[996,64 6038168.0~ 88~ 0.50 13835.85 90.13 ENID 0.S/lO0 13835.90 90.13 15651.79 90.13 TARGET SXIT 1565~.$4 90.13 TD 4-1/2" [./qR PT<II> 15851.79 90.]3 NIL U~E AC~ (Anadr[]l (c)98 MPP84P02 3 .2C 3:55 PM P) 328,46 318,46 3]8.46 318.46 3]8.46 6953,05 6909.I5 6953,05 6909.1~ 6948,80 6904.90 69~8.80 6904.90 69~8.33 6904.43 6983,90 8590,00 859a.o5 10~05.08 10405,13 10604,98 2757-87 N 9599.6D W 531992,67 6038194.67 KS 0.50 2757.9l N 9599-63 W 531972.64 6038194,71 KS O.OO 4117.18 N 10803.80 W 530761,00 6039547,00 KS 0.80 %117.1% N 10803.8] W 53~760.96 6039547.04 KS 0.00 4266.80 N 10936.49 W 538627.55 6039695,94 0.00 SR"AREB 'S Rv C'ES' B'C T"L"LzNG ' -- · I i i ~ ii i ii ii Anadr J ] ] Sch]umber'ger - ! . iii iiii , ii ii i NPF-B4 (PEA) VERTICAL SECTION VIEW Section aL: 259.55 TVD Scale.' ~ inch = 1500 feet : -- ' Oep Scs]e,' ~ inch t500 feet i F"~:""~-<-'"'~!.-.!iY PLA. N ~ = ~ -- , E) "~";"' - ',~:',,..~ !TION : ............. C- , ..................... : ............ ~ '. ....... L;...',.;._~ ....I B) XOP / BUILD I/JO0 400 400 -0 0.0 C) BUILD t.5/tSO 550 550 2 ~.7 ............... D) ~ZLD 2/tO0 758 75~ t4 5.5 ~-¢~r-t~4~~ E) END 2/~OO ~80a S753 308 26.5 F) ~ZLD ~,5/~9D tgO0 t842 348 27.5 ............. 6) ENO 2.5/t00 3]03 ~735 ~33 56.3 HI 9-5/8' 6S6 PI <11> 5492 3954 3~89 59. I] C~VE ~.5/~00 9947 5762 6249 59.4 d) E~ 2,5/t00 tO346 6444 224t 60,O '~ K) 7' CSG PT <ii> 11176 6~9 7746 60.0 .... ~ . . . ~~~ L] C~VE I0/]00 ~1206 6B7~ 776~ 60.0 ~] TAR6EI ENIRY 11227 6684 7~77 62.C ........ ~ END ~8/~00 ..~ J~5 695t 7964 Bg.E ~~_~._ OI CUEVE 0,5/t00 ]3176 6954 9t30 Bg.E ~"- Pi TA~EIHI~T ,3tg8 6954 9i46 ~ ...... ~ ................ t ......... ........... ~N g O RS , ,, ~ ..... ,, , , , ~ ' ,, _ .... ' 13 13 ~3 ........ SeC~ ~on, ~,e~,arture ................................................. '1 DRILLING ...... ii i ill MPF-84 (P2A) PLAN VIEW CLOSURE 11739 feet at Azimuth 29~,3~ 5O0 750 ~" ..... .: · :. /'",,A-.,,--:'"" ~' ISCALE ....... : ! inch = J500 feet - ' ....... · ..... ' ................ " IDRAWN ....... : 28 Sep 1998 .... ~ :" .:': ""...: :: :: :. ,. i ! I'( !-;!... ,~- !'-,~' - : ;: ,~. ., I i :', .. ~ ':'A,"'il, ,.'..%' m~ l-Y.;"',~, ' i ; ':"'"' " ' ' "'~"'/' ¥ ;-,{.-" ~ "~.,~'l · ! - - ' ................ .. i "'~" . · · .... ',' r,-?.-_ --, · I i' 7... : ~ i' [~ '"':"" 14arker lden~i¢ication .: ..... ": ...... ~.~'1 "t :' A) KB 0 0 N 0 E '- ! !..:, ..... L: .... " B) KOP / BUILD 1/100 4OD 0 N 0 E I I C) BUILD ].5/~00 550 0 $ 2 ..... ". ..... '~'."'.~" '.:-" ' D) BUILD 2/100 750 0 ......................... --..r-- ~- .:,.. E) END ~/~00 ~800 F) BUILD 2.5/'~00 ~@O0 B) END 2.5/i00 3~03 9 S ~J33 .......... H) 9-5/8' CS6 PT <11> 5492 25 S 3189 %,% I) CURVE 2.5/200 9047 49 S 52z9 Exit (~oint] J) ENB 2.5/100 i0346 361 N 7244 W K) 7" CSB , ............ L) CURVE ,O/,O0 ,,206 BBTN 777t, %~ TARBEI ENTRY ,,227 gOON 7784W ~ S) TD ~-1J2' LNR PT<J J> 15852 4267 N 10936 W .............................. t Entry (Point) ~ ...... .... , ........ ~ =. : ............... - ..~ ...... . .... ...... ............. 0 ...... ~ .............. I ...... t2750 12000 ~ t250 }0500 9750 9000 B~50 7500 6750 6000 5250 4~0 3750 3000 2250 ~50D 750 0 750 <- ~ESf ' E~ST -> z ]> ~)] (c)LH N~TB~02 3.~ 4:09 P~ PI SHARED SERVTCES-D'RTLL 'NG" ...... · _ 3: _ III I ~ ''1 '' III I I , II ' ' ~ - II I _ II I II __ I II I II I I ........ i,, i /nadri ]] Sch]umberger I , II NPF-B4 {P2A) VERTICAL SECTION VIEW Section at: 316.7] ] ~ inch : 600 feet IOeP Sca]e.: 1 inch 600 teet ..... r ............ ~Sl:~b lCkC i ii i ii ....... Marker Identification ND ' BKB SECfN [NCLI i~"'sL"kF~l~"-,~l A) g-5/B" CSG PT <Ii> 5492 3954 2168 59.4; B) CURVE 2.5/100 9047 5762 4249 59.,~ __ C) END 2.5/~00 ~0346 6444 5230 60.0 . D) 7' CSG PT <11> Jrt?6 6&59 5949 -- E) CURVE lO/'~O0 li2O6 6674 5975 50.0 F) IAAGEI ENTRY ~J227 6664 5993 52.0 G) E~ 10/100 ~J505 695t 6260 89.8 .. , .... ...._: ...,_ ...... i '...,.. · , AKA-:,;t. ,,' H) CL/t:tVE I).5/~00 !31?Ei 8954 793t 89.8 ,..',,,'. u '.,i.'; ,,: i i .'.. Z) TARGEI 1,tlrDPT ~3198 6954 7953 90.0 i :'! .... FCR ~ · ' ' , .. ....... L] TD 4-~/2' LNA PT<II> ~5852 6946 ~0605 90 I':4 '"'"' '''~' :""'"""-' ~ ~''i [': I,) ~ _.,. ~ L~[ ~ i',",-* '. '-.. ' __ ! , r':'.:.._.'_~".:¢"~, i'"T"~(':, ~j r,, ,..~t-..,.! ,¢!:. c · ~ .-') ....... .f, .. ,, ........... T~-~Z- T~ ~- ............. ~,t_%-'~ iz-"~¢0~' . ) ~~~;~';~l'i~~:'~'~r'--'- '~,'~)~,~ ~ ...... ' ~ ~F~'~t~p~ ~inH', ..... 'MTL 0'V ~'~ i~'H ' '~ .......................... G I{ J K L 1 6600 5900 Shared Services Drilling Contact: I Well Name: Tom Maunder IMP F-84 Well Plan Summarv I Type of Well (producer or injector): 564-4429 I Kuparuk Horizontal Producer Surface Location: 2040' NSL, 2976' WEL, Sec. 06, T13N ,R10E, UM., AK Target Kuparuk 2936' NSL, 321' WEL, Sec. 02, T13N, R09E, UM., AK Bottom Hole Location: 1019' NSL, 3475' WEL, Sec. 35, T14N, R09E, UM., AK I AFE Number: 1337145 I Rig: I Nabors 27-E Estimated Start Date: I 12 Nov. 98 I I Operating days to complete: MD: 1'5,852' I I TVD.'16,948' Bkb I IKBE'' 131 143.8, IWell Design: Ultra Slim Hole Liner Horizontal Well I 9-5/8", 40# surface, 7", 26# Intermediate, 1 4-1/2", 12.6# Liner Formation Markers: Formation Tops MD TVD (ss) EMW Formation Pressure Base Permafrost 1902 1800 8.4 ppg 786 psi NA Top Schrader Bluff 5493 3910 8.4 ppg 1708 psi OB Base Schrader Bluff 6023 4180 8.4 ppg 1826 psi Top HRZ 10277 6365 8.4 ppg 2780 psi Base HRZ 10466 6460 8.4 ppg 2822 psi MK-19 10626 6540 8.4 ppg 2857 psi TKD 10926 6690 9.1 ppg 3165 psi TKB 11186 6820 5.0 ppg 1773 psi TKA 11216 6835 5.0 ppg 1777 psi TKA3FFarget 11227 6840 5.0 ppg 1779 psi TKA2 11261 6855 5.0 ppg 1784 psi TKA1 11330 6880 5.0 ppg 1793 psi Miluveach Not Reached 6940 NA NA Total Depth 15852_+ 6904_+ 5.0 ppg 1793 psi · *These are estimated maximum pressures and the actual pressures may be lower. Casing/Tubing Program: Hole ~ize ' Csg~ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/'rVD MDrrVD 24" 20" 91.1# H-40 Weld 80 32/32 112/112 12 1/4" 9-5/8" 40# L-80 BOSS 6,192 31/31 6,223/4,325 8-1/2" 7" 26# L-80 Hyd ril 11,166 30/30 11,1 96/6,868 563 6" 4-1/2" 12.6# L-80 Butt 4,902 10,950/6,758 15,852/6,904 The internal /ield pressure of the 7" 29# casing is 8,160 psi. The deepest anticipated gas should occur no deeper than the oil water contact which is expected below the TKA1 at _ 6,923 TVDbkb In this instance, this worst case surface pressure would occur with a full column of gas from the reservoir from a depth of __.6,923 TVDbkb. The maximum anticipated surface pressure in this case assuming a reservoir pressure of 1,793 psi is 1,100 psi using a 0.1 psi/ft gas gradient, well below the internal yield pressure rating of the 7" casing. PAGE I Cementinc ~rogram: Halliburton Cementinc Services Hole ~' ~'Casing Interval & V~)lume~ Spacer Type of Cement Propertiesz Cate~lory Size/Depth Excess Surface Lead~ Lead Lead Lead First Stage 9-5/8" @ 2,100-5,000' 480 sx 70 bbls Permafrost "E" Den 12.0 ppg 6,223' @ 15% 186 bbls Fresh water Yield 2.17 ft 3/sx excess Water 11.63 gps TT 4.0 hrs 5,000-6,223' Tail5 Tai~l Tail @ 0% 340 sx Premium Class "G" w/ Den 15.8 ppg excess 69 bbls 0.2 % CaCI, 0.15 #/sk FIoceele Yield 1.15 ft 3/sx Water 4.9 gps -I-i- 4.0 hrs Second Sta~je Lead~ Lead Lead Lead Stage collar° @ 0-1,950' 985 sx 75 bbls Permafrost"E" Den 12.0 ppg 2,100' @ 250% 381 bbls Fresh water Yield 2.17 ft 3/sx excess Water 11.63 gps TT 4.0 hrs Tails 1,950'-2,100' 170 sx Tail Tail @ 250% 29 bbls Permafrost"C" Den 15.6 ppg excess Yield 0.96 ft 3/sx Water 3.65 gps TT 4.0 hrs Intermediate 7" @ 10,196- 110 sx 70 bbls. Premium Class"G"w/ Den 15.8 ppg First Stage 11,196' 11,196' 23 bbls NSCI Spacer 0.2 % CFR-3 Yield 1.15 ft 3/sx 0.1% HR-5 Water 5.0 gps 0.45% Halad 344 TT 3.5-4.5 hrs @ 140° F FL 50cc/30 rain @140° F Liner 4-1/2" @ 10,950- 375 sx_~ 40 bbls. Premium Class "G" w/ Den 15.8 ppg 15,852' 15,852' 77 bbls NSCI Spacer 0.2 % CFR-3 Yield 1.15 ft 3/sx 0.1% HR-5 Water 5.0 gps 0.45% Halad 344 TT 3.5-4.5 hrs @140° F FL 50cc/30 min @140° F 1. Volumes may be rounded. 2. Ensure thickening times are adequate relative to pumping job requirement. Actual times should be based on job requirements and lab tests. Perform lab tests on mixed cements, spacers and mud's to ensure compatibility prior to pumping job. 3. A Type H ES Cementer will be installed in the 9-5/8" csg. 200' md below the base of the Permafrost at 2,100'MD__+ 4. The calculated first stage lead is designed to fill from the 9-5/8" ES Cementer at 2,100' md to 5,000' md which is 500'+ above the shoe plus 15% Excess. 5. The calculated first stage tail cement volume is designed to fill from 500' md above the shoe to surface TD at 6,223' md (4,325 TVD bkb) plus 0% open hole excess and 80' 9-5/8", 40# casing shoe joint volume. 6. The surface hole Second Stage Lead Cement Volume covers the interval from 0-1,950' md The designed second stage lead cement volume includes 250% open hole excess.. 7. The surface hole Second Stage Tail Cement Volume covers the interval from 1,950-2,100' md The calculated second stage tail cement volume includes 250% open hole excess. 8. Install one(l) Bow Spring Centralizers per joint on the bottom 10 joints of 9-5/8" casing (required). 9. The intermediate hole cement is designed to cover the interval from 10,176' md (1000'+ above the shoe) to TD at 11,176' plus 30% open hole excess and the shoe joint volume of 80' md of 7", 26# casing. 10. Use 7" x 8-1/4" Straight Blade Rigid Centralizers and install one per joint from above the float collar to 500' above the shoe. Use two centralizers per joint on the shoe joints. 11. Install two 7" marker joints and position 350' above TD. 12. Place all centralizers in middle of joints using stop collars. 13. Liner cement volume based on gauge hole plus 20% XS and 200' of fill above TOE 14. Mix surface cement slurries on the fly. Mixing style for the intermediate and and liner slurries is being evaluated. PAGE 2 TEM 11:26 AM 10/29/98 Loggin~l/Formation Evaluation Program: Anadrill Schlumberger Surface-12-1/4" 1. MWD/LWD 9-5/8"/7" Cased Hole Intermediate-8-1/2" Production-6" Mud Logging D&I / GR / DWOB / DTQE from spud to TD of surface hole, real time & recorded 1. NA. No cased hole logs planned for side track 1. MWD/LWD D&I/CDR/G R/PWD/DWOB/DTQE All logs required from drill out of 9-5/8" to TD, real time and recorded. 1. MWD/LWD D&l/Vision 475/DWOB/DTQE . Schlumberger IDEAL System in all hole sizes. SPIN Log: Record: GR, Depth, Surface Torque and DW©B/DTOQ, ROP, Hook Load, RPM, Pump Pressure, GPM (in and out) during all operations. Lo_q_q i n_q Nomenclature M10 PowerPlus DWOB/DTQE: GR: CDR: ADN: ROP: PWD Directional Inclination and Azimuth Downhole weight on bit and torque Gamma Ray Compensated Dual Resitivity Azimuthal Density Neutron (Density, Porosity, and Sonic Caliper) Rate of penetration Pressure While Drilling Mud Program' Baroid Drilling Fluids Inc. Surface Mud Properties: LSND Freshwater Mud Density Marsh Yield 10 sec 10 min pH Fluid Solids (PPG) Viscosity Point gel gel Loss % 8.6-9.6 50-150 15-35 8-15 10-30 9-10 8-15 <9 Intermediate Mud Properties to 7" TD LSND Freshwater Mud Density Marsh Yield 10 sec 10 min pH APl HTHP Solids (PPG) Viscosity Point gel gel Filtrate %LGS 8.6-9.6 35-45 6-20 3-10 7-20 8.5-9.5 6-12 NC <6 4-6 <10 HRZ Production Mud Properties from 7" Csg. QuikDriI-N (Solids Free) Pt. to TD. Density LSR LSR 10 sec 10 min pH APl HTHP Solids (PPG) Viscosity YP gel gel Filtrate %LGS 8.8 >30,000 8-16 8.5-9.0 NC <6 Well Control: Well control equipment consisting of 5000 psi working pressure pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. The diverter, BOPE and drilling fluid system schematics are on file with AOGCC. PAGE 3 TEM 11:26 AM 10/29/98 Directional: KOP1 400' Start Variable @ 1.0°- 2.5°/100 to 59.42° inc. and 269.5° az. EOB @ 3,227' Tangent Hole Angle 59.42-60.0° from 3,227-11,206' md Final Build to Land 10.0°/100 from 60° to 89.4° EOB 11,500' md Well 89-90° from 11,500-15,852'. Maximum Hole Angle Close Approach Wells Survey Program All wells may remain flowing while drilling F-84 and no shut-ins are required. 1. Surface to 6,223' MWD surveys. 2. 6,223'-TD MWD surveys. Disposal: No "Drilling Wastes" will be injected or disposed into F-84-'~hi~c ...r~.~ th:s ;,-~-'a~ll. Cuttings Handlin_cl: Cuttings should be hauled to the ball mill at CC-2A. The Milne Point reserve pit can be opened in emergencies by notifying Karen Thomas (564-4305) with request. Fluids Handling: All drilling wastes will be hauled off and disposed of in accordance with pertinent rules and regulations. GENERAL DISCUSSION Well Objective: MPU F-84 is planned as a horizontal Kuparuk River A Sand producer tapping the fault block that L-28 originally targeted. The target section is generally southwest of F-Pad. The horizontal section is oriented SE to NW. TD is planned at 15,852' with a final departure of 10,604'. The well is designed with over 4600' of 6" horizontal hole. The surface casing will be set below the Schrader Bluff at 6,223' (4,325' TVD bkb). An 8-1/2" hole will be directionally drilled to land the 7" casing at 60° inc. above the Kuparuk B at 11,196' md. After setting 7" intermediate casing the angle will be increased to near horizontal through the Kuparuk A series. Geolo_qv Well MPF-84 is planned as a horizontal producer in the updip portion of hydraulic unit 290. This well is proposed based on the reservoir information from L-28, L-39, and L-40 and interpretation of recently acquired seismic data of unit 290 and Tract 22. This new information gives confidence that additional reservoir volume exist further updip in the targeted fault block. Due to the problems encountered on L-28, the horizontal section of F-84 is intended to access the L-28 target as well as the additional reservoir area updip. DRILLING HAZARDS AND RISKS SUMMARY: Formation pressures are expected to be Iow in this partially drained fault block. Reservoir pressure is estimated at 1777 psi at 6878' tvd, (5.0 ppg EMW) in the Kuparuk formation. To provide isolation for the long Iow pressured reservoir section, a 7" intermediate casing string will be top set above the Kuparuk B. the central portion of the target may be faulted. Wellbore stability may be affected by any faulting. Close Approaches There are surface approaches associated with the drilling of MP F-84, however, tolerance lines will be carefully monitored and deviations from the proposed well path minimized. Water, Gas and WAG Iniection This is a partially depleted fault block with reservoir pressures estimated at 5.0 ppg EMW. Annular Iniection Currently annular injection is not permitted on F-Pad. PAGE 4 TEM 11:26 AM 10/29/98 Lost Circulation: Lost circulation is prevalent while running casing and cementing in the surface but also occurs in the production hole. Losses are extremely probable while cementing the production casing. Losses have been experienced while drilling the 12-1/4" surface and while circulating to condition mud before, while and after running surface casing to bottom. Major losses have also occurred while cementing the production casing. In many instances, the losses were minimized by reducing swab and surge pressures, minimizing mud weight and conditioning the mud before cementing. Contingencies have been incorporated to well program remedy loses if encountered. Mud weights will be maintained between 9.1-9.4 ppg down to the D shale. With the Iow reservoir pressure expected, lost circulation is possible. This should be minimized due to the viscosity of the Quik-Dril N. The other lost circulation risk is when intra~reservoir faults are crossed. Stuck Pipe Potential: Differential sticking concerns can exist in the surface interval with the Schrader Bluff sands and others exposed. Normal precautions should be employed. Differential sticking concerns are reduced in the intermediate interval since the Schrader sands will be cased off. Although reduced, good practices should be followed to avoid sticking mishaps. Employ the PWD data to gauge hole cleaning effectiveness. The lower reservoir pressure of the production section can effect stuck pipe potential. Employing the drill in fluid chosen should help reduce sticking potential. Again, strict attention to the pipe movement parameters while drilling must be maintained. Formation Pressure: KUPARUK A1 SAND 6,923' TVDss 1,793 PSI 5.0 PPG EMW Formation pressures are expected to be Iow and the pore pressure is estimated at 5.0 ppg EMW. The deepest anticipated gas should occur no deeper than the oil water contact which is expected below the TKA1 at ± 6,923' TVDss. In this instance, this worst case surface pressure would occur with a full column of gas from the reservoir from a depth of +_6,923' TVDbkb. The maximum anticipated surface pressure in this case assuming a reservoir pressure of 1,793 psi is 1,100 psi. See the updated Milne Point F-Pad Data Sheet prepared by Pete Van Dusen for information on F pad and review recent wells drilled on F Pad. PAGE 5 TEM 11:26 AM 10/29/98 MP F-84 Kuparuk Horizontal Producer Summary of Proposed Operations , . , 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. Drill and Set 20" Conductor. Weld an FMC landing ring for an FMC Gen 5 Well head on conductor as well as a nipple to aid in performing potential well head stability cement job. Prepare location for rig move. MIRU Nabors 27E drilling rig. NU and test 20" Diverter system. Ensure the diverter is as per AOGCC specifications and is approved by an AOGCC supervisor. Build Spud Mud. Drill a 12-1/4" surface hole as per directional plan. Run Directional MWD/LWD (GR/DIR/DWOB/DTOQ) from surface to 12-1/4" TD. Run 9-5/8" casing. Space out ES Type H Cementer to 2,100' md. Perform Two Stage Cement Job. Complete the surface casing cementing check list. ND 20" Diverter, NU and Test 13-5/8" BOP MU a PDC bit on an extended power section medium speed motor, with Directional MWD and LWD (GR/DIR/CDR/DWOB/DTOQ/PWD). RIH, Drill out Float Equipment and 20' of new formation. Perform the FIT as per Recommended Practices Manual. Record pressure versus cumulative volume during the LOT test for the well file. Drill 8.5" hole to 7" TD as per directional plan. Use PWD information to assess hole cleaning. Observe for losses as mud weight is increased for shale stability in the lower hole section. Condition hole, short trip to surface casing, and TOH for casing. Run 7" casing. Perform Single Stage Cement Job. Complete the production casing cementing check list. Displace cement with mud. Bump the plug and test casing to 3500 psig for 5 minutes. Bleed off pressure and check floats. Break off BOPE, install 7" packoff and NU tubing spool. NU BOPE including 11"x 13-5/8" DSA. Be aware of BOP height increase. Notify AOGCC inspector 24 hours in advance of BOP test. LD previous drilling assembly if necessary. PU 3-1/2" or 4" DP. MU drilling BHA. Tag float collar and pressure test casing to 3500 psi. Drill out float equipment, clean rat hole, and drill 20' of new formation. Pick up into casing, while continuing to circulate at drilling rate. Monitor well for any losses. This procedure will accomplish a drill out FIT. Displace old mud with fresh drill in fluid. When the displacement is finished, drill ahead per the directional plan. At TD, circulate and condition the well for the liner. PAGE 6 TEM 11:26 AM 10/29/98 24. 25. 26. 27. 28. 29. 30. 31. 32. NOTE: TOH and LD BHA. PU and run 4-1/2" liner. Condition well on bottom and prepare for cementing. Reciprocate liner. Cement per program. Displace cement with perforating pill. Set liner hanger and liner top packer. Release from liner and clean up wellbore per liner procedure. Circulate well to treated sea water. TOH, LDDP, and tools. Freeze protect well from 2200' to surface with diesel. ND 'BOP and NU dry hole tree. Test tree to 5000 psi. RDM© Nabors 27E. Freeze protect 9-5/8" x 7" annulus to 2200' with crude oil. THIS WELL MAY BE COMPLETED WITH 27E. THE WORKOVER PROGRAM WITH A DETAILED COMPLETION PROCEDURE WILL BE SUBMITTED ONCE THE PERFORATION INTERVALS ARE SELECTED. PAGE 7 TEM 11:26 AM 10/29/98 Anadriil Schlumberger Alaska Oistrlct 1940 Arctic Blvd. Anchorage, AK 99503 DIRECTIONAL WE~L PLAN for SHARED SERVICES DRILLING Wekl ......... : MPF-84 (P2A) Field ........ : MiLne Point Co~utation..: Minimum Curvature Units ........ : FERT Surface Lat..: 70.507~8266 Surface Losg.: 149.65974678 hesal Description Surface ...... : 2040 FSL 2976 FEL S06 T13N R~0E UM Targe~ Bntry.: 2936 FSL 321 FEL 802 T13N R09E~ Tas~ert MidPt: 4327 FSL 1701FEL S02 T13N R09E OM Target ~xit..: 869 FSL 3342 FEL S35 T14N R09E UM BHL .......... : 1019 FSL 3475 FEL S35 T14N R09E UM LOCATIONS - ALASKA Zone: 4 X-Coord Y-Coord 541586.61 6035490.85 533?98,76 6036347.19 532411.00 60]7?32.00 530761.00 60395~7.00 530627.S$ 6039695.94 STATr0~ MEASURED I~CI.~ IDENTIFICATION OEPTT{ ANGLE ~ 0.o0 0.00 KOP / SU]nO 1/100 400.O0 0.00 500.00 ~.00 ~U[LO ~.$/~00 550.00 1.55 600.00 AZIMUTH TVD mmmmmmmme mmmmmmmm mm~mmm{m 0,00 0.00 -43.90 2~9.55 400.00 3~6.10 269.55 499.99 456.09 269.55 ~49.95 S06.08 269.55 599.95 Prepared ..... : 28 Sep 1995 Vert sect az.: 316.71 KB eLevatio~.: 43.90 ft Ma§netic Dcln: +27.369 (E) Scale Factor.: 0,99990196 Co~¥ersence..: +0.32075985 .,?,.:,.:A D:,! il..L AKA-D,-'C ~ PLAN NOT., *--'.::r' P,O D , FOR '. E>-(ECUTION'" :,.,..,.,~,-~'- .~.,. .... .--. ....... , SECTION OOORDINATES-~OM DEPART ~HL~EAD 0.00 0,00 ~ 0.00 0.00 0.00 ~ 0.00 0-59 0,0~ ~ 0.87 ~.4~ 0.0~ ~ ~,07 2.67 0.03 S 3.93 ALASKA Zone ¢ Y 541586.6~ 6035490.~5 S41586.61 6035490.85 S41585.74 6035490.84 S41584.54 60~5490.82 541~82.68 6055490.80 BUILD 2/100 700.00 ¢.50 269.55 699,75 655.85 6.82 0,08 S 10.03 750.00 5.50 269.55 749.56 705.66 9.78 0.1~ S 14,39 800,00 ~.50 269~56 599.29 755.39 23.3~ 0.~S S 19.6~ 900,00 8.50 169.55 $98.43 85{.53 22.2~ 0.25 S 32.67 1000,00 10,50 ~ 269.55 997.05 955,15 33.4~ 0.38 S 49.~7 541576,58 6035490.72 541572,22 6035490.66 S41567.00 6035490.59 54~553.95 6035490.41 545537.45 6035490.~9 1100.00 12.50 269.55 L09B.0~ L051.54 ~6.99 0.54 S 69.10 H 541557,52 603S489,92 Iii! ~/ LO0 905 0.00 905 o.o0 90~ 1.O0 905 L.50 905 L.5~ 905 2.00 RS 2.00 KS 2.00 ~S 2.00 HS 2.00 HS 2.00 -U m (Anadrtll (c)98 MPFB4PO2 3.2C 3:55 PM P} ~j HPF-$4 (L::~2A) 28, .q,,,.p L998 Page 2 PROPOSED WELL PROFILE STATION IDEiNTIFICATION MEASURED INCLEN DEPTR ANGLE 12G0.00 14.50 1300.00 16.50 1400.00 18,50 1500.00 2a.50 1600.00 22.50 DIi~CTION VERTICAL-DEPTT[$ AZ IMDTH TVD SOB-SEA 269.55 1192.27 1148.37 269.55 1288.63 1244.73 269.55 1384.00 1340.10 269.55 1478.26 1434-36 269.55 1571.29 1527. ~9 SECTION COORDI~ATES-~ROM DEPART 62.87 0.72 9 92.45 81.0~ 0-93 S 119.17 101.49 124.19 ]49.11 1.71 S 2/~.26 tmmmm ALASKA Zone 4 TOOL DL/ X Y FACE lmm[=;;=: =Rmmmmmmmu ~==n mmmn 541494.]8 603~489.61 ~S 2,00 54146~.46 6035489.25 KS 2.00 54~437.40 6035488.85 KS 2.00 54~t04.02 6035488.40 H$ 2.00 541367,35 6035487.91 ~S 2.00 END 2/I00 BUILD 2.S/]00 SAS~ 1700.00 24.50 1800.00 26.50 1850.00 27.50 1900.00 27.50 3901.98 27.50 1950,00 27..,50 2000,00 28,75 2100.00 31,25 2200.00 33,95 2300-00 36.25 269.55 L662.99 16[9.09 176.22 269.55 /T53.25 1709.35 205.50 269,55 Z797.80 1753.90 220.93 269.55 18~2.1~ 1798.25 236.63 269.55 18~3.90 1800.00 23T.25 269-55 1886,50 1842.60 252.33 269.55 1930,59 ]886.69 268.36 269.55 2017.1~ 3973.29 302.36 269.55 2101.52 2057.62 338.89 269.55 2183.4~ 2139.53 377,S0 2.02 S 259.13 2.36 S 502.18 2.53 S 324,88 2.71 $ 347,97 .. 2.92 $ 348.88 2.89 S 3.08 S 3.47 S 3.89 S 4.33 S 541327.52 6035487.38 ~S 2.00 541284.48 6035486.80 HS 2.00 541261.78 603~486,50 HS 2,00 541236.70 6035486.19 HS 0.00 541237.79 6035~86.1~ HS 0.00 371.05 W S41215.61 6035~85.8B ~S O.O0 394.62 W S41192.05 6035~B5.56 HS 2.50 444.62 ~ $4~142.06 6015~84.90 HS 2.50 498.3~ W 541088.35 6035&84.18 HS 2.50 ~55.69 ~ 541031.0~ 6035483.41 HS 2.50 ~¢o 2.s/~oo 2400.00 38.75 2500.00 41.25 2600.00 43.75 2700.00 46.25 2800.00 48.75 2900.00 BL.25 3000.00 5~.25 3100.00 56.25 5102.89 56.32 3200.00 58.75 3226,89 59.42 SCHRADER NA 5492.48 59,42 (Anadrtll (c398 MPP84P02 3.2C 3:55 PM P) 269.55 2262.~6 22L8.86 419.29 4.8[ · 269,55 2339.36 2295.46 463.00 5.3/ 269,55 2413.08 1369.18 508.94 5.83 269,55 2483.T8 24~9.88 557.02 6.39 269,55 2551.34 2507,44 607.15 6,96 269.55 2615.61 2571.7L 659.2~ 269.55 2696.48 2632.58 713.38 269-55 2733.84 2689.94 .768-8B 269.55 2735,44 2691,54 770.52 269.55 278~,$6 2743.66 826.23 269.$5 2801.38 2757.48 841.92 269.55 3953.90 3910.00 2168.33 ~69.55 3953.90 3910.00 2168,33 7.56 8.61 8.83 9.¢7 9.65 S 24.86 S 24.86 S · ,, 616.56 W 5¢0970.L5 6035482.59 HS 2.50 6B0.83 W 54090S.88 60354B1.73 HS 2.S0 7~8.38 W 51083~-~4 6035480.83 }IS 2.50 819.09 W 540767.65 6035479,88 HS 2,5D 892.81 W 540693.94 6035478,89 ~S 2.50 969.40 W 540617.36 6035~7~.87 HS 2.50 1048.7~ W 5405~8.04 6035476.80 H8 2.50 1130.64 W 540456.15 6035475.7[ HS 2.50 1133.04 W 540453.75 6035475.68 HS 2.50 1214-97 W 540371.84 6035~74.58 HS 2.50 1238.03 ~ 540348.77 6035474.27 HS 2.50 3188-5] [~ S38398,60 6035448.15 RS 0.00 3188.51 W 538398.60 6035448.15 HS O.O0 ."',~"..:.., ·, {I. I_ AkA-~.,I.~ ! F.'U A q{:':'i: ........' ..... ~ .... r ,,.Y-~ Ix4 : · ,, r FOR: 1 E><ECI. jTION ~F-S4 (PZA~ 25 ~ep 1998 Pa~e 3 PROPOSED WE/~I, PROPILE STATION IOE~NTrFICATION SASE SCHRADER CURVE 2.5/100 MT~SU~LED [NCLN DIRECTION DEPTH A..h'GL~ AZIMUTH mmmmmmtm mm~t~ 6023.24 59.42 269.55 9046.99 59.42 269-55 9047.04 59.42 269.56 9100.00 59.13 271.37 9200.00 56.64 27~.83 mf~mmmmmm~mfiml~:~,~.~:u Mmmm~mmm SECTION D~PART 4223.90 4180.00 S762.11 5718.21 $762.13 5718.2~ ~7~9-~9 57~$.29 5840.88 5796-98 2479.07 4249.36 4249.39 4280.87 4342.84 C00RDINkTEE-FRO~ 28.42 S 3645.45 48.72 S 6248.63 48.72 S 6R48.68 ~8.35 S 6294.~ 43.73 $ 6379.67 ALASKA Zone 4 TOOL OL/ X Y FACE 100 537941.74 6035442.03 HS 0.00 535338.96 6035407.16 101R 0.00 5~5338.92 6035407.16 IO1R 3.00 535293.40 6035407.27 100R 3.00 535207.92 603~411.42 95R 3.00 9300-00 58.25 278.32 9400.00 57.96 281.84 9500.00 57.76 285.37 9600.00 57.66 288.92 9700.00 57.66 292.47 5893.22 5849.32 5946.07 $902.~7 5999-29 S955.39 6052.72 6000.82 6306.23 6062.33 4407.98 4476.09 4547.00 4620.51 4696.42 33.98 ~ 6464.30 19.L5 S 6547.87 0.78 N 6630.15 25.~9 N 67~0.9~ $5.5~ N 6789.92 535L23.23 6035420.69 97R 3.00 535039.59 6035435.07 95R 3.00 534957.21 6035454.52 93R 3.00 534~76.32 6035478.98 9LR 3.00 534797.15 6035508.38 $9R 3.00 9800.00 57.76 9900.00 57.96 L000O.O0 58.25 10ROO.O0 58.64 L02Q0.00 59.~3 TOP HRZ L0276.75 59.56 L0300.O0 59.70 10346.09 60.00 END 2.5/100 ~0346,L4 60,00 ~5.kSE HRZ 10466.29 60.00 MK-L9 10626.29 60.00 10926.09 60,00 TKUD (F/JP CAPROCK) 30926.29 60.00 7" CDG PT <~1> 1~176.29 60.00 KLrPARUK R ~1186.29 60,00 296.02 6~59.67 6L15.77 299.55 62:2.89 6L~8.99 303.07 6265.74 622~-84 306.56 6318.08 6274.18 310.02 6369.76 6~25.86 312.65 6408.90 636~.00 313.4~ 6420.65 6376.75 ,, 315.00 6443.80 63]~.90 315.00 6443.83 6~99.93 3L5.00 6503.90 6460~0~ 315.00 315.00 315.00 315.00 315.00 6~83.90 6540.00 6733.$0 6689.90 6733.90 6690.00 ~855.90 6815.00 6863.90 68~0.00 4774.52 4854.59 4936.43 5019.80 5104.47 5170.20 5190.21 5230.03 5230.07 5334.08 5479.58 5732.10 S732.27 5948-68 $957.34 90.25 N 6866-98 W 534719.91 129.71 N 6941-87 W 534644.81 173.82 N 7014.38 W S34572.05 222.{7 N 7084.33 W 534501.85 275.51 N 715~.5~ W S34434.38 332.80 N 7215.03 ~ 53~369.84 360.59 N 7244.99 ~ 534~41.~2 360.63 N 7244.~3 ~ 534341.09 434.20 N 7317.90 ~ 534267.11 6035542,65 87R 3.00 6035581.69 85R 3.00 6035625,39 83R 3.00 60~5673.64 82£ 3.00 6035726.30 8OR 3.00 6035769.62 78R 3.00 ~035783.22 78R 3.00 6035810.85 RS 3.00 6035810.89 HS O.0O 6035884.04 HS O.OQ 532.18 N 74LS.B8 715,77 N 7599.47 7~5,89 N 7599.59 868,99 N 7752.69 875.11 N 7758.81 534168.60 603598L.46 HS 0-00 $33984.00 6036164.00 HS 0.00 533983.88 6036164.12 ~ 0.00 533829.94 60363~6.34 ~ 0.00 533823.T9 6036322.43 ES O.OO 11206.09 60.00 CURVE 10/100 11206.L4 60.0L KUPARUK A 11216-45 61.04 (Anadrtll (c)98 MPF84PO2 3.2C 3:55 PM P) 3L510~3 315.00 315.01 6873.80 6829.90 6873.83 6829.93 6878.90 6835.00 5974.48 S974.52 5983,49 887.24 N 7770.93 W 5338LL.60 6036334.48 1R 0.00 887.27 ~ 7770.97 W 5338LL.56 6036334.52 1R /O.O0 893.61 N 7777.31 W 533805.18 6036340.83 lA 10.00 ·'"J_ ".. ':. I .... '" ' '".. AKA . [)p~. r --,. q:-'.::', I'""!.. "r:f p,, A N ~ .,,r ': .,.' · : ..- ~ ,, · :~ ,,",, · ..,.~ ," ""~ t'" £) Dl"h~/f..".' V'~ - · . , .,, FOP, , ",-'-, UTJON '0 "0 ]> 6') ITl MPW-84 (P7A) 28 Sep 1998 Page PROEOSED WELL PROFILE ........... STAT ION l DENT r? I CAT TARGET ENTRY TKA3 TKA [ M~ASURED DEPTH ~5226.95 11300.00 11330.6L INCLN AN~LE DIRECTIO~ AZIMUTH 62.09 62.09 65.48 69.59 72.45 315.02 315.02 315.06 VERT ICA~. - DEPT}{.5 TVD SUB-SEA 6883.90 6840.00 6&83-90 6840.00 f898.90 6855,00 69~3-90 6870,00 6923.90 6880.00 SECTION DEPART 5992,72 5992.72 6023.17 6059.25 6088.16 COORDINATES- FROM 900.]5 N 728].84 900.14 N ~783.8~ 92~.90 N 7805.36 947.26 N ~830.85 967.75 N 7851.26 ALASKA Zone ¢ 533798.62 6036347.3~ 5~3798.6~ 6036347.32 533776.98 60]6368.75 533751.35 6036394.16 533730.83 60364i4.54 TCX~U an/ 1R lO.O0 iR ~0.00 1R 10.00 1R 10.00 1R 10.00 END lo/[oo 11400.0~ 39.39 ' 315.19 6940,77 6896.87 6155.40 11500.00 89.39 515 ,27 6950.53 6906.63 6254.77 11505.00 89.89 315 .28 6950 ,56 6906.66 6259- 76 11505. D5 89.89 315.28 6950.56 6906.66 6~59- 81 13176.33 89.89 ~15,28 6953,78 ~909,88 7930.57 1015.44 N 7898.70 W 533683.13 603646L.96 HS 10.O0 1086.01 N ~968,70 W 5336~2.74 603~532.1~ HS 10.00 ~089,$6 N 7972.21 W 533609-21 6036535.66 HS 10.00 ~089.59 ~ 7972.25 W 533609.)7 6036535.69 ~S 0.00 2277,05 N 9148,3~ W 532426.60 60~77~6.43 ~IS 0-00 CURVE o. s/soo TARGET MIDPT 13176.38 89189 13198.37 90.00 13198.42 90-00 ~3200.00 90.00 13300.00 90.02 515.28 6953.78 5909,88 7930.62 2277.08 N 515,28 6953,80 6909.90 7952.60 2292.7~ N ~15.28 6953.80 6909.90 7952.65 2292.$4 N ~15.28 6953.80 6909.90 795~.23 ~293.8~ N ~15.78 6953.~8 6909.88 805~.21 2365.23 N 9148.35 W 532426.56 6037716,46 }tS 0.50 9163-8Z W 532411.00 6037732.00 HS 0.50 9163.86 W 5324~0.97 6037732,03 ~$ 0.00 9164,97 W 532409.85 6037733.15 BBR 0.50 9235.02 W 532339.41 6037804.12 88R 0.50 13400.00 90.04 13500.00 90.06 13600.00 90.08 13700.00 90.11 13800.00 90,13 316.28 6953.73 6909.83 8156.20 316.78 6953.63 6909,73 8254.20 317.~8 6953.50 6909.60 8354,20 317,78 6953,34 6909,4~ 845~.19 338.28 6953.13 6909.~3 8554.16 2437.2[ N 9304.44 2509.78 N 9373.23 2S82.96 N 9441.39 2656.72 N 9508.9/ 2731.0~ N 9575.?~ 532269.59 6037875.69 BBR 0.50 ~32200.40 6037947.88 BeR 0.50 532131.84 6038020.66 BSR 0.50 S32063.92 603809~.04 flBR 0.50 $31996.64 603BI68.OL 88R 0.50 1383S.~5 90.13 END 0.5/100 13835.90 90.13 15651.79 90.13 TARGET EXIT 15651.84 90.13 TD 4-1/2" GI4R ET<II~ 15851.79 90.13 ~ I LtrV~ACH (Anadri]l (c)98 MPFS4P02 3 .2C 3:55 PM P) 338.46 318.46 318.46 318.46 318.46 6953,05 6909.I5 6953.05 6909.15 6948,80 6904.9~ 6948.80 6904.90 6948.33 6904.43 6983,90 6940.00 8590.00 8590.05 10~05.08 10405.13 1060A,98 2757.87 N 9599,60 W S31972,67 6038194.67 H8 0.50 2757.91 N 9599.63 W 531972.64 6038194,7/ HB 0.00 4117.10 N 10803.80 W 530761,00 6039547,00 H8 O.O0 i117.1~ N 10803.6] W 530760.96 6039547.04 H9 0.00 ~266.B0 N 10936.4~ W 530627.55 6039695.94 0.00 :KB> 75o SB' RED SE'RVlO'ES D'F{' LLIN' " Anadr J ] ] Schlumberger MPF-84 (P2A) VERTICAL SECTION VIEW ,. Section at: 269.55 TVD Scale ' ] inch : 1500 feet Dep Scale ' ] inch: 1500 feet ,,~.,,...l .!TIC ~ , ,, . ...... C-- ! ¢ Marker Identi~icatinn ~] BK8 SECTN ~NCL D '- ~ ~ ' · ....................................... ~ .... ¢.._: .... ~ B) IBP / BUILD ~/t88 ~N~ ........... D~ ~LD 2/t~¢ ~5~ ZS~ t4 5.~ E} END 2/~ tBO8 ~759 ~8 26.~ .......................... ~ ~r't141 F~ ~ILD ~.5/~ lgO8 18~2 348 27.~ I1 CffiVE 2.5/100 9D47 5762 6249 59.~ J) E~ 2.5/100 ~0346 644~ 7241 60.( ,,,. ~ .......... K) 7' CSB PT <1 I > ~ t 176 6~g 7746 60.( L) C~VE t0/~00 ~206 6B74 7764 60.( HI TARGEI ENTRY 1t227 6B~4 7777 52.( ......... . ,, , ~ END ~0/~00 _~ ~ , OI CUBVE 0,5/~00 ~3~76 695~ PI TA~El HI~T ]31B8 6954 9t46 BO.( '~ ~ ~' ~? ........... ~ ' .. ~) END 0.5/~00 J3B36 G953 ~78 90 ' ...... ~ ..... R) TAR~ET EXIT ~5652 G94B t077~ 90 ' S) TD 4-1/2" LNR Pr<Il > ~5B5~ 694B tO~3 90.: , , .I - ~ ," . ....... ........ := ....... ~¢i~.II, ,llIII:.IIIII IIlII, l,IIII, ,lIIIII~IIil IIII, ,lmiii1 ................... ~-~ .................. ~ O RS . ..... , .... . ..... , ................... t ....... ~ .............. [,.,,:__ 5O 32 ] O0 0 750 1500 2250 3000 3750 4500 5250 6000 6750 7500 8250 9000 9750 10500 i1250 i2800 ~2750 I ' ' S~Ct !On ,Departure ............................................... z 750 5250 22~ 9 750 i-- Z ,. E--- SHARED MPF-84 (P2A) PLAN VIEW CLOSURE ' 11739 feet at Azimuth 29~.31 .... I~ECLz -iL) ................ · " ' ISCALE ....... : ! inch : ~.500 feet ~ ";".".: . :. ,.~.~ K...\-".~--'-" ~ -- :..~ ....... ;.: . ..... ~ '-~,, .......~. ~ IBRAWN ....... : 28 Sep 1998 : ...- .. ~,, ,., ~)~ ~ . ,~ ~ . · ... ~ . ': .,.~ ~ .- ~-'~ I ,, ~ F'"': ' '~ "· .. ~ ~'~ ~"~ ~/~J ~ 7~'~ ~Z~, ' , ........ ................ -",.~-." Marker Identification ~ N/S E/VI ' ~.~ ~'.,"..':...:../~"J~'i~l ~ A) ~B o o N 0 E { '-' " : B) KOP /BUILD t/tOO 400 0 N 0 E {' , ,.,,"..)"' ,T/'~" ,~ ~ " ', i" I C} BUILD ].5/HO0 550 0 S 2 W ............. -'". .... .:.:=_,.=,.. ;u) BUILD U~O0 ZSO 0 S ~ ~ E) EN~ ei,O0 ~BOO ~ S ~Oe ~ F) BUILD 2.5/~00 Hgoo 3 S 34B W G) END 2.5/100 3'03 9 S '~33 W . , ,. ,. CUBVE ~.~/~00 gO~l ~ S ~g ~ Exit I) J) END 2.~/~00 ~03~B ~B~ N 72~ W 7" CSG PT <11 > 11376 B69 N 7753 W CURVE 10/~00 ~320B 887 N 7771 N TARBE3 ENTRY ~J227 900 N 7784 N TARGEI HIDPT .~ t3~gB ~293 N 9~64 W END tO/lO0 i1505 tOgO N 7972 W CURVE D.5/300 13376 2277 N gi4B W , t (Po'in[ R) FARGEI EXIT i5652 4117 N 10804 W S) TO 4-t/~' LNR PT<II> 1585~ 426Z N I0936 W .... ~ ......... , ........... _ , 3000 2250 ~500 750 0 750 <- I~ESf ' EAST -> 12750 12000 i 1250 :~0500 9750 9000 B250 7500 6750 6000 5250 ~500 3750 ' c U c( Z T V SHARED SERVICES BRI'LLING' I iii - _ _ I .- I Il I II I I I ,4nadn i 11 Schlu benger mi Ill _ MPF-84 (P2A) VERTICAL SECTION VIEW Section at: 316.71 ....... I TVD Scale.: :l inch = 600 feet IOep Scale.: ! inch : 600 feet ........ ~li;b ~'~' . ,. Marker Identlficatinn MD ' BKB SECfN [NCL ................. Y~'~M'-~ A) g-5/B~ CSG PT <Ii> 5492 3954 21~ B) CURVE 2.5/100 9047 5762 4249 59.z C) END 2.5/J00 ~0346 6444 5230 60. ' D) 7' CSG PT <l l> ~tt76 6~9 5949 60, -- E) CURVE t0/J00 ~1206 6B74 5975 F) IARGEI ENTRY ~J227 6B~ 5993 62.( .... G) E~ tO/lO0 ~505 6951 6260 ; .., .~., .: A~._,,~t :~~.~>,.. , B) C~VE O.5/J00 ~3176 6954 793t 89.~ l,..u..,,i.';,L:ii.L'm z) TARGET MEDPT ~3193 6954 7953 90.( , I [.*' '~ ." ,! [ , . ' K) TA~EI EXfT i5652 6949 ~0405 90.' ,. ~,- ~. ~?"' t -I'M [ ~t ,~-~ ' a EN, 0.5/~00 13836 6953 8590 90.' I I . i../ t .... ~.. '' ....... N ..... '""" '¢ "'"?d; ~',/[':[']) F( ~ L] TO 4-t/~' LNR PT<II> t585~ 6948 ]0605 90.' ~ =/ ~ ;' Y'F', . ,. g'.~.-.,1 > ~'¢ ~ .......... ~'~ ........ .Tm ~ > ..~-.~,' . .. } ....... ~ ,. ...... ' ........ ~z- - - 1 '" ..... ~¢~ A ~' ' .................. I LN :2 3 13 13 540o 5700 6000 6300 6600 6900 7200 7500 7800 St00 a400 8700 9000 9300 9600 9900 I0200 10500 !0600 Section Departure ~naOr'~l] [c]§B I,¢FB4P02 3,~ 3;57 FH ~) H 140326 r °^~ ! c.~o~.o. ~ VENDOR ALASKAST 14 OO DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NE~T ' - - 070998 'CK0709980 100. O0 100. O0 HANDLINQ INST' s/h kathg campoamo~ x THE AWACHED CHECK IS IN PAYME~ FOR ~MS DE~RIB~ ABOVE. F'lkt I, & r'Ool ~'.~, q~,~_D ~ GE_OI, AREA .... ~___~_ .................. tlNIlfl ADMINISTRATION 7 8. 9. 10 11. ENGINEERING COMPANY i._',~P:.~i."-:=.]::'' ......... WEI.I '~'ii";~Zi:~':--:"-~:~'. ............ PROGRAM: exp El (lev [] red~ll I] serv [.'1 wellbore segtl aim. disposal para I(~.¢t'; ..... ,Y'/"?2?_q~ ON/Or:r: SHORE . .O./~ Pelndt fee attached .......... I ease ~mnrber appropriate ....... Unique well name and rmmbel Well located in a defined pool ........... Well Iocaled proper distance flonr drilling unit botuMmy. Well located proper distance from other wells ..... Sufficienl acreage available in drilling trail If deviated, is wellbore plat included .......... Operator only affected pady ................ Operator has appropriate bond in force ............. Permil can be issued without conservation order ........ I-"e~r~fit can be issued wilhout administrative approval Can permit be approved before 15-day wait ........... 14. Condtlclor string provided ................ 15. Sulface casing protects all known USDWs ......... 16 CM I' vol adequate to circulate on conductor & surf csg .... 17 CMI vol adequate to tie-in long string to stu f csg ....... 18 CMI will cover all known productive horizons .......... 19 Casing designs adequate for C, T, B & permafrost ...... 20 Adc;qt~ate tankage or reserve pit ................ 21. If a re-drill, has a 10-403 for abandonment been approved. 22. 23. 24. 25. IIAPPI'~ '- DAlE 26. II '' 27'28. ...................... 29. JJGEOLOGY AJk',l,'~ ~ i')6 ii.:/ II/%_< .... (A) will contaJn waste in a suitable r..ce~iving zone; ...... Alq~l~ I)A'I [': (I:;) will ~lo con al ' ' ~e~; or cause ¢hilling wasle. to surface; /' ~ .......... (C) will llot im~l integrity of ti~e-~'-well used for disposal; ([')) will i~ot da~ producing formation or impair recovery from a pool; and ...... Lwi,_j ot =- d,'cumver,* 20 AAC 25.2 2 or 20 AAC Adequate wellbore separation proposed ............. ~ N ............................................................. If diveder required, does il meet regulations .......... ~ N Drilling fluid program schematic & equip Iisi adequale .... ~ N ......................................................... BOPE~s, do lhey' meet regulation .... ,~.._,, ~,,. ...... ,~ N - - BOPE press rating appropriate test to _~,6_~ O psig. '(Y~ N .............................................................. Choke manifold cornplies w/APl RP-53~(M~-8--~. "]-]'-."~-. . . ~ N Work will occur without operation shutdown .......... L~./'~ ........................ /s_pi.esenceof H2S gas probable. .... .:' . :_~_-,_-_.,'_.:._.:....:. --y--- .-(N')""~' ................................... -;"-'"'-- -----I ernfil can be issued w/o hydrogen sulfide rneasures Y /N,/ Data presented on potential overpressure zones ....... Y//~' ~--:'Jz~ S:islnic aha ys s of shallow gas zones ..... ' ........ ///5' N .... ../'....~:_7-1 , Sc, abed condition survey (if off-shore) ........... / Y N ....................................... (:ontacl name/phone for weekly progless ~e, porls ...... ¢;/ Y N . ' . . /'exploratory only] .......... Y N Y N Y N Y N Y N G E C)I ~)'¢~ Y' ,Iii (; \ul',,dh~ ,,I,%vf)J(Jl;IfJ\,h, lfi, t/, I,,,, Ih, t ENGINEERING: Ul~~.r C_O_.M_MM_.LS__S ! ..0. N: DW · JDI I.~ c o _, ~_¢.'_/.~/,~.~. ............ :...r.. -::z:~: .................................................................................... Commentsllnstrtictions: Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER * . ............................ . ....... SCHLUMBERGER . ............................ . COMPANY NAME : BP EXPLORATION WELL NAME : MPF-84 FIELD NAME : MILNE POINT BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292293100 REFERENCE NO : 99070 RECEIVED 1999 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-FEB-1999 11:29 PAGE **** REEL HEADER **** SERVICE NAME : EDIT DATE : 99/02/16 ORIGIN : FLIC REEL NAME : 99070 CONTINUATION # : PREVIOUS REEL : COGENT : BP EXPLORATION, MPF-84, MILNE POINT, API #50-029-22931-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 99/02/16 ORIGIN : FLIC TAPE NAME : 99070 CONTINUATION # : 1 PREVIOUS TAPE : CO~4ENT : BP EXPLORATION, MPF-84, MILNE POINT, API #50-029-22931-00 TAPE HEADER MILNE POINT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL : ELEVATION(FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: MPF-84 500292293100 BP EXPLORATION SCHLUMBERGER WELL SERVICES 16-FEB-99 WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING BIT RUN 1 BIT RUN 2 BIT RUN 3 6 13N lOB 2040 2976 44.08 11.90 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 24.000 20.000 112.0 12.250 9.675 5833.0 8.500 7.000 11252.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-FEB-1999 11:29 REMARKS: THIS FILE CONTAINS THE LDWG FORMATTED LWD CDR, GST, AND IMPULSE DATA AQUIRED ON BP EXPLORATION'S MPF-84 WELL IN FOUR BIT RUNS. DEPTH SHIFTING IS WAIVED PER KATIE NITZBURG. $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION · O01CO1 DATE : 99/02/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.5000 FILE SU~94ARY LDWG TOOL CODE START DEPTH STOP DEPTH MWD 12230.0 250.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE LDWG TOOL CODE $ REMARKS: THIS FILE CONTAINS THE EDITED LWD DATA. THE CURVES ARE MERGED AT THE DEPTHS SHOWN ABOVE. THE CALS AND CALA CURVES COULD NOT BE QRO PROCESSED BECAUSE THE HOLE RISES ABOVE 90 DEGREES. $ .......... EQUIVALENT UNSHIFTED DEPTH .......... BIT RUN NO. MERGE TOP MERGE BASE 1 250.0 5830.0 2 5830.0 10200.0 3 10200.0 11258.0 4 11258.0 12184.0 LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-FEB-1999 11:29 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 68 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 15 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 4000298 O0 000 O0 0 1 1 1 4 68 0000000000 FET MWD HR 4000298 O0 000 O0 0 1 1 1 4 68 0000000000 ROP MWD FPHR 4000298 O0 000 O0 0 1 1 1 4 68 0000000000 GR MWD GAPI 4000298 O0 000 O0 0 1 1 1 4 68 0000000000 RPD MWD OH3ff44000298 O0 000 O0 0 1 1 1 4 68 0000000000 RPM MWD 0H~944000298 O0 000 O0 0 1 1 1 4 68 0000000000 RPS MWD OPRVk44000298 O0 000 O0 0 1 1 1 4 68 0000000000 RPX MWD 0H3~4 4000298 O0 000 O0 0 i 1 1 4 68 0000000000 RPXXMWD 0H2~44000298 O0 000 O0 0 1 1 1 4 68 0000000000 RAD MWD 0H~44000298 O0 000 O0 0 1 1 1 4 68 0000000000 RAM MWD OH~4~4000298 O0 000 O0 0 1 1 1 4 68 0000000000 RAS ~qD Okff414 4000298 O0 000 O0 0 1 1 1 4 68 0000000000 RAX ~qD OtOff4 4000298 O0 000 O0 0 1 1 1 4 68 0000000000 CALS ~VD OH~ff4 4000298 O0 000 O0 0 1 1 1 4 68 0000000000 CALA MWD OIR~44000298 O0 000 O0 0 1 1 1 4 68 0000000000 RBITMWD 0t0~44000298 O0 000 O0 0 I 1 1 4 68 0000000000 RBS1 MWD OH~k44000298 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 16~FEB-1999 11:29 PAGE: DEPT. 12230.000 FET.MWD -999.250 ROP.MWD RPD.MWD -999.250 RPM. MWD -999.250 RPS.MWD RPXX.MWD -999.250 ~.MWD -999.250 ~.MWD RAX.MWD -999.250 CALS.MWD -999.250 CALA.MWD RBS1.MWD -999.250 DEPT. 250.000 FET.I4WD -999.250 ROP.MWD RPD.MWD -999.250 RPM. MWD -999.250 RPS.MWD RPXX.MWD -999.250 RAD.MWD -999.250 RAM. MWD RAX.MWD -999.250 CALS.MWD -999.250 CALA.~IWD RBS1.MWD -999.250 43.796 GR.MWD -999.250 RPX.MWD -999.250 RAS.MWD -999.250 RBIT.MWD -999.250 GR.MWD -999.250 RPX.MWD -999.250 P~AS.f~WD -999.250 RBIT.MWD -999.250 -999.250 -999.250 -999.250 53.763 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE · FLIC VERSION · O01CO1 DATE : 99/02/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION : O01CO1 DATE · 99/02/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NTJMBER 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: O. 5000 FILE SGW~4ARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 5850.0 25.0 $ LOG HEADER DATA DATE LOGGED: 05-DEC-98 SOFTWARE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-FEB-1999 11:29 PAGE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: 5. OC O1 _ 5.0 R~ - TItlE 12236.0 250.0 12236.0 0.0 63.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GA~k~A RAY CDR RESISTIVITY GR GST GEOSTEERING TOOL IMP RESISTIVITY $ TOOL NUMBER MiO CDR 7026 GST IMP 052 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): 12. 250 5850.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT); MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): LSND 9.00 NEUTRON TOOL MATRIX: ~TRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) EWR FREQUENCY (HZ) 20000 REMARKS: ************ 12.25 in Hole ******** Run 1: 80 ft to 5850 ft MDC 038 Software: MDC 5.0c IDEAL v50c O1 GR corrected for bit size and mud weight. Data in real time only. ************* 8.5 in Hole ********** Run 2:5850 ft to 10200 ft MDC 372, CDR 7026 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-FEB-1999 11:29 PAGE: Software: I4DC vS. Oc, CDR vS. Oc IDEAL v50c O1 GR corrected for bit size and mud weight. Data from downhole tool memory. ************* 8.5 in Hole ********** Run 3:10200 ft to 11260 ft ~4DC 152, CDR 7026, GST 2806 Software: MDC vS. Oc, CDR vS. Oc IDEAL v50c O1 GR corrected for bit size and mud weight. GST data in real time only. CDR data from downhole tool memory. ************* 6 in Hole ********** Run 3: 11260 ft to 12236 ft IMP 052 Software: IMP 5.53 IAB _ IDEAL v5 1 a 12 GR corrected for bit size and mud weight. Data from downhole tool memory. Thank you for using Schlumberger. THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 16 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center ~ l~ 16-FEB-1999 11:29 PAGE: ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE ~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CI~SS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 4000298 O0 000 O0 0 2 1 1 4 68 0000000000 GR GRRW GAPI 4000298 O0 000 O0 0 2 1 ! 4 68 0000000000 ROP5 LW1 F/HR 4000298 O0 000 O0 0 2 1 1 4 68 0000000000 GR GRIN GAPI 4000298 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 5850.000 GR.GRRW -999.250 ROPS.LW1 129.430 GR.GRIN DEPT. 25.000 GR.GRRW -999.250 ROPS.LW1 -999.250 GR.GRIN -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION : O01CO1 DATE : 99/02/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION · O01CO1 DATE : 99/02/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NTJMBER 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-FEB-1999 11:29 PAGE: MWD 903.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (bI~gORY or REAL-TIME) TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: 10200.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY CDR RESISTIVITY GR GST GEOSTEERING TOOL IMP RESISTIVITY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 05-DEC-98 5. OC O1 _ 5.0 MEMORY 12236.0 250.0 12236.0 59.7 64.5 TOOL NUMBER MiO CDR 7026 GST IMP 052 8.500 5850.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9. O0 MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OPH~4) AT T~gPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 2. 000 MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): ~gR FREQUENCY (HZ): ************ 12.25 in Hole ******** Run 1: 80 ft to 5850 ft NDC 038 Software: blDC 5.0c REMARKS: 20000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-FEB-1999 11:29 PAGE: IDEAL v50c O1 GR corrected for bit size and mud weight. Data in real time only. ************* 8.5 in Hole ********** Run 2:5850 ft to 10200 ft 14DC 372, CDR 7026 Software: f4DC vS.0c, CDR vS.0c IDEAL v50c O1 GR corrected for bit size and mud weight. Data from downhole tool memory. ************* 8.5 in Hole ********** Run 3:10200 ft to 11260 ft MDC 152, CDR 7026, GST 2806 Software: MDC vS.0c, CDR vS.0c IDEAL v50c O1 GR corrected for bit size and mud weight. GST data in real time only. CDR data from downhole tool memory. ************* 6 in Hole ********** Run 3:11260 ft to 12236 ft IMP 052 Software: IMP 5.53 IAB _ IDEAL v5 la 12 GR corrected for bit size and mud weight. Data from downhole tool memory. Thank you for using Schlumberger. THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-FEB-1999 11:29 PAGE: 10 TYPE REPR CODE VALUE 0 66 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 4000298 O0 000 O0 0 3 1 1 4 68 0000000000 TVDE LW2 FT 4000298 O0 000 O0 0 3 1 1 4 68 0000000000 ROP5 LW2 F/HR 4000298 O0 000 O0 0 3 1 1 4 68 0000000000 TABR LW2 4000298 O0 000 O0 0 3 1 1 4 68 0000000000 ATR LW2 OH~4~ 4000298 O0 000 O0 0 3 1 1 4 68 0000000000 PSR LW2 OH~4M4000298 O0 000 O0 0 3 1 1 4 68 0000000000 GR LW2 GAPI 4000298 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 903 . 000 TVDE. LW2 ATR . LW2 0.113 PSR . LW2 905.100 ROPS.LW2 9143.430 TABR.LW2 58. 744 GR. LW2 39.150 135.000 DEPT. 10200.000 TVDE.LW2 10200.000 ROP5.LW2 204.764 TABR.LW2 2084.188 A TR . LW2 3. 011 PSR . LW2 2. 751 GR. LW2 108. 834 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION · O01CO1 DATE : 99/02/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-FEB-1999 11:29 PAGE: 11 FILE HEADER FILE NUMBER 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUt~gARY VENDOR TOOL CODE START DEPTH MWD 939.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH .......... 11300.5 05 -DEC - 98 5. OC O1 _ 5.0 MEMORY 12236.0 250.0 12236.0 59.7 64.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAb~4A RAY CDR RESISTIVITY GR GST GEOSTEERING TOOL IMP RESISTIVITY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 8.500 5850.0 NEUTRON TOOL F~ATRIX: TOOL~ER ........... MiO CDR 7026 GST IMP 052 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.60 MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (ObIb94) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 2. 000 MUD AT MAX CIRCULATIONG TEMPERATURE ~JD FILTRATE AT (MT): MUD CAKE AT (MT): LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-FEB-1999 11:29 PAGE: 12 MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 REMARKS: ************ 12.25 in Hole ******** Run 1:80 ft to 5850 ft MDC 038 Software: MDC 5.0c IDEAL v50c O1 GR corrected for bit size and mud weight. Data in real time only. ************* 8.5 in Hole ********** Run 2:5850 ft to 10200 ft MDC 372, CDR 7026 Software: MDC v5.0c, CDR vS.0c IDEAL v50c O1 GR corrected for bit size and mud weight. Data from downhole tool memory. ************* 8.5 in Hole ********** Run 3:10200 ft to 11260 ft MDC 152, CDR 7026, GST 2806 Software: ~4DC vS. Oc, CDR vS. Oc IDEAL v50c O1 GR corrected for bit size and mud weight. GST data in real time only. CDR data from do~hole tool memory. ************* 6 in Hole ********** Run 3: 11260 ft to 12236 ft IMP 052 Software: IMP 5.53 IAB _ IDEAL v5 la 12 GR corrected for bit size and mud weight. Data from downhole tool memory. Thank you for using Schlumberger. THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #3. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 40 4 66 255 5 66 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-FEB-1999 11:29 PAGE: 13 TYPE REPR CODE VALUE 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 4000298 O0 000 O0 0 4 1 1 4 68 0000000000 TVDE LW3 FT 4000298 O0 000 O0 0 4 1 1 4 68 0000000000 ROP5 LW3 F/HR 4000298 O0 000 O0 0 4 1 1 4 68 0000000000 TABR LW3 4000298 O0 000 O0 0 4 1 1 4 68 0000000000 ATR LW3 OH~4 4000298 O0 000 O0 0 4 1 1 4 68 0000000000 PSR LW3 0H~44000298 O0 000 O0 0 4 1 1 4 68 0000000000 GR LW3 GAPI 4000298 O0 000 O0 0 4 1 1 4 68 0000000000 GR GST GAPI 4000298 O0 000 O0 0 4 1 1 4 68 0000000000 RBIT LW3 OHMM4000298 O0 000 O0 0 4 1 1 4 68 0000000000 RB1 LW3 OHMM4000298 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 939. 500 TVDE. LW3 939. 625 ROP5. LW3 3219. 580 TABR. LW3 A TR . LW3 O . 132 PSR . LW3 0 . 124 GR . LW3 38 . 587 GR. GST RBIT. LW3 -999. 250 RB1. LW3 -999. 250 DEPT. 11300. 500 TVDE.LW3 6896. 084 ROPS.LW3 720. 000 TABR.LW3 ATR. LW3 4 . 209 PSR. LW3 4 . 803 GR. LW3 120. 892 GR . GST RBIT. LW3 ~ 999. 250 RB1. LW3 -999. 250 21.000 -999.250 36823.578 -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-FEB-1999 11:29 PAGE: 14 **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION · O01CO1 DATE : 99/02/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LOG HEADER DATA FILE HEAl)ER FILE A~JMBER 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: 0. 5000 FILE SUNmE4RY VENDOR TOOL CODE START DEPTH STOP DEPTH 11149.5 12236.0 DATE LOGGED: 05-DEC- 98 SOFTWARE: SURFACE SOFTWARE VERSION: 5. OC O1 _ DOWNHOLE SOFTWARE VERSION: 5.0 DATA TYPE (MEMORY or REAL-TIME): MEMORY TD DRILLER (FT) : 12236.0 TOP LOG INTERVAL (FT) : 250.0 BOTTOM LOG INTERVAL (FT) : 12236.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM A~VGLE: 60.3 MAXIMUM ANGLE: 91.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL ~BER GR GANk~A RAY Mi O CDR RESISTIVITY GR CDR 7026 GST GEOSTEERING TOOL GST LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-FEB-1999 11:29 PAGE: 15 IMP $ RESISTIVITY IMP 052 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) 6. 000 11260.0 BOREHOLE CONDITIONS MUD TYPE: KCL MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OH~I) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 0.150 MUD AT MAX CIRCULATIONG TEMPERATURE MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 REMARKS ************ 12.25 in Hole ******** Run 1: 80 ft to 5850 ft NDC 038 Software: ~iDC 5.0c IDEAL v50c O1 GR corrected for bit size and mud weight. Data in real time only. ************* 8.5 in Hole ********** Run 2:5850 ft to 10200 ft I~DC 372, CDR 7026 Software: ~DC vS.0c, CDR vS.0c IDEAL v50c O1 GR corrected for bit size and mud weight. Data from downhole tool memory. ************* 8.5 in Hole ********** Run 3: 10200 ft to 11260 ft I~DC 152, CDR 7026, GST 2806 Software: NDC vS.0c, CDR vS.0c IDEAL v50c O1 GR correcEed for bit size and mud weight. GST data in real time only. CDR data from downhole tool memory. ************* 6 in Hole ********** Run 3: 11260 ft to 12236 ft IMP 052 Software: IMP 5.53 IAB _ IDEA~ v5 la 12 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-FEB-1999 11:29 PAGE: 16 GR corrected for bit size and mud weight. Da ta from downhol e tool memory. Thank you for using Schlumberger. THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #4. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 64 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NOY4B SAMP ELEM CODE (HEX) DEPT FT 4000298 O0 000 O0 0 5 1 t 4 68 0000000000 TAB LW4 S 4000298 O0 000 O0 0 $ 1 1 4 68 0000000000 TVDE LW4 FT 4000298 O0 000 O0 0 5 1 1 4 68 0000000000 ROP5 LW4 F/HR 4000298 O0 000 O0 0 5 1 ! 4 68 0000000000 TABR LW4 S 4000298 O0 000 O0 0 5 1 1 4 68 0000000000 AIOH LW4 OH2~M4000298 O0 000 O0 0 5 t t 4 68 0000000000 A16H LW4 OH~k44000298 O0 000 O0 0 5 1 i 4 68 0000000000 A22H LW4 OH~ffq4000298 O0 000 O0 0 5 1 1 4 68 0000000000 A28H LW4 0I~V~44000298 O0 000 O0 0 5 i 1 4 68 0000000000 A34H LW4 OH~M4000298 O0 000 O0 0 5 1 i 4 68 0000000000 PIOH LW4 OHNk44000298 O0 000 O0 0 5 1 1 4 68 0000000000 P16H LW4 0H~4000298 O0 000 O0 0 5 1 1 4 68 0000000000 P22H LW4 0IH~44000298 O0 000 O0 0 $ 1 1 4 68 0000000000 P28H LW4 0HN~I4000298 O0 000 O0 0 5 1 1 4 68 0000000000 P34H LW4 OPHir4000298 O0 000 O0 0 5 1 ! 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-FEB-1999 11:29 PAGE: 17 NAME SERV UNIT SERVICE API API API API FILE NUMB ~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) GR LW4 GAPI 4000298 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 11149. 500 TAB. LW4 O. 000 TVDE. LW4 6846.134 ROPS. LW4 TABR. LW4 O. 000 AiOH. LW4 O. 119 A16H. LW4 O. 100 A22H. LW4 A28H. LW4 9.067 A34H.LW4 300.000 PiOH. LW4 3.304 P16H. LW4 P22H. LW4 5. 804 P28H. LW4 1. 026 P34H. LW4 0. 214 GR. LW4 DEPT. 12236. 000 TAB. LW4 1 . 194 TVDE. LW4 6956. 292 ROPS. LW4 TABR. r,W4 3650.000 AiOH. LW4 3.201 A16H. LW4 3.337 A22H. LW4 A28H. LW4 3.706 A34H.LW4 3.923 PiOH. LW4 4.223 P16H. LW4 P22H. LW4 6. 055 P28H.LW4 7. 330 P34H. LW4 8. 875 GR. LW4 -999.250 0.100 4.714 59.600 40.362 3.490 5.066 98.553 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 99/02/1 6 ORIGIN · FLIC TAPE NAME : 99070 CONTINUATION # : 1 PREVIOUS TAPE : CO~4ENT : BP EXPLORATION, MPF-84, MILNE POINT, API #50-029-22931-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 99/02/16 ORIGIN : FLIC REEL NAME : 99070 CONTINUATION # : PREVIOUS REEL : CO~94ENT : BP EXPLORATION, MPF-84, MILNE POINT, API #50-029-22931-00