Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
198-212
RECEIVED • STATE OF ALASKA JAN 0 5 2015 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG • CGCC`" la. Well Status: ❑Oil LI Gas ❑SPLUG ❑ Other.®Abandoned ❑Suspended 1b. Well Class 20AAC 25.105 20AAC 25 110 El Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG ❑WDSPL ❑Other No.of Completion Zero ® Development 0 Service 2. Operator Name: 5. Date Comp.,Susp., Aband.• • 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 12/10/20 4 198-212 - 314-280 3. Address: 6. Date Spudded: 13. API Number P.O. Box 196612,Anchorage,Alaska 99519-6612 11/22/1998 50-029-21144-01-00 4a. Location of Well(Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 11/27/1998 PBU U-09A 168' FNL, 1852' FEL, Sec. 19, T11N, R13E, UM 8. KB(ft above MSL): 76.2' 15. Field/Pool(s) Top of Productive Horizon: 4577' FNL, 1740' FWL, Sec.20,T11N, R13E, UM GL(ft above MSL): 47.38' Prudhoe Bay/Prudhoe Bay • Total Depth: 9. Plug Back Depth(MD+TVD) 4124' FNL, 3450' FWL, Sec. 20,T11N, R13E, UM • 11155' 8956' 4b. Location of Well(State Base Plane Coordinates,NAD. 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 632155 ' y- 5960416 - Zone- ASP4 . 12891' 9057' ADL 028283 TPI: x- 635840 y- 5956072 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 637541 y- 5956556 Zone- ASP4 None 18. Directional Surve 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): Y ❑Yes ® No N/A ft MSL 1900' (Approx.) (Submit electronic and printed information per 20 AAC 25.050) ( PP ) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD, GR, RES, RES/AIT, DT/BHC, CNL, LDL, GR, Caliper, SP, MRES 10863' • 8788' ' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20"x 30" Insulated Conductor_ 39' _ 119' 39' 119' 36" 8 cu yds Concrete 13-5/8" 72# L-80 38' 2704' 38' 2663' 17-1/4" 3255 cu ft Permafrost'E',465 cu ft PF II 9-5/8" 47# L-80 35' 10858' 35' 8784' 12-1/4" 2088 cu ft Class'G',230 cu ft Class'G',279 cu ft PF'C' 7" 26# L-80 10605'_ 10863' 8587' 8788' 8-1/2" 288 cu ft Class'G' 4-1/2" 12.6# L-80 10719' 12885' 8675' 9055' 6" 326 cu ft Class'G' 24. Open to production or injection'? 0 Yes ® No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ (MD+TVD of Top&Bottom;Perforation Size and Number): TVD) np 4-1/2", 12.6#, L-80 10721' 10501'/8508' DA-n-: j 26. ACID,FRACTURE,CEMENT SQUEEZE, ETC. I: illi OilLi ' i WAS HYDRAULIC FRACTURING USED DURING COMPLETION?D Yes ®No - _.___ d, DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED FEB 0 2015 11155' Set Whipstock 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired'? ❑Yes ® No , Sidewall Core(s)Acquired? 0 Yes ® No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips, photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 10/2012 k.-7--1„ ../G//5-- CONTINUED ON REVERSE S it ri nal Qnly,,s 29 GEOLOGIC MARKERS(List all formations an 'kers encounter 30. FORMATION TESTS NAME viii TVD Well Tested? v Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test results. Attach separate sheets to this form,if needed,and submit Permafrost Base detailed test information per 20 AAC 25.071. Sag River 10869' 8792' None Shublik 10903' 8818' Shublik B 10949' 8851' Shublik C 10991' 8878' Sadlerochit 11025' 8898' Formation at Total Depth: • 31.List of Attachment: Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Well Schematic Diagram 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact. Travis Boltz,564-5750 Email: Travis.BoltZ@bp.com Printed Name: Title: Drilling Technologist Joe Lastufka Signature. Phone 564-4091 Date: I /5/I5 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28 Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only U-09A, Well History (Pre-Rig Sidetrack) Date Summary 11/23/14 DRIFT W/3.80"CENT&2" SAMPLE BAILER. PASS THROUGH MILLED OUT XN-NIP @ 10,699'SLM (10,709' MD). W/O ANY ISSUES. DEVIATE OUT @ 11,302'SLM. NO SAMPLE. 11/24/14 T/I/0=120/550/0. Set 4" CIW H-TWC#291. Installed BOP test spool (TS#05). Torqued and Pt'd. Final T/I/O=TWC/550/0. RDMO. 12/01/14 T/I/O= SSV/573/4.Temp =SI. IA&OA FL's(Pre MIT IA&OA). No AL,flowline, wellhouse, scaffolding or swab platform handrails. IA FL @ 120' (6 bbls). OA FL= near surface. SV, WV=?. SSV= C. MV=0. IA, OA= OTG. 0940 hrs. 12/02/14 T/I/O =TWC/570/0. Temp= SI. MIT-IA PASSED to 3000 psi& MIT-OA to 2000 psi (pre rig). No AL, flowline, wellhouse, or scaffolding. IA FL @-120' (6 bbls) & OA FL near surface. Unable to obtain TP will proceed per WIE. Bled IAP to 166 psi in 25 minutes. Used 16.2 bbls of AMB DSL to pressure up IA to 3005 psi. IA lost 38 psi in the 1st 15 minutes& 12 psi in the 2nd 15 minutes for a total loss of 50 psi in 30. U Tube fluid from IA to OA increasing OAP to 1994 psi. SI OA increase and start bleeding IAP. 12/03/14 T/I/O =TWC/570/0. Temp= SI. MIT-IA PASSED to 3000 psi & MIT-OA FAILED to 2000 psi (pre rig). Continued bleeding IA to 431 psi. During IA bleed OA decreased to 89 psi. Pumped 7 bbls of AMB DSL down OA to reach 1376 psi before rapidly losing all pressure. Dug out snow from cellar to view surface casing. Pumped 1 bbls while watching surface casing. Unable to visualize fluid but also unable to gain pressure. Job complete. Hung tags&sign. Final WHP's=TWC/396/0. SV=?. WV= LOTO'ed. SSV= Closed. MV=Open. IA&OA= OTG. NOVP. 03:15. 12/03/14 T/I/O=TWC/426/0. Temp= SI. Bled IAP to 0 psi. (CTD). No flowline or AL. Bled IAP from 426 to 23 psi, returned -7.5 bbls fluid with slugs of gas. Heater hose staged and in cellar. Cellar has-15" of snow melt. Final WHPs=TWC/36/0. SV, WV, SSV, MV=C. IA, OA= OTG. 1630. NOVP. 12/04/14 T/I/O=SSV/62/0. Temp =SI. Bleed IAP& OAP to 0 psi. (Pre-Rig). IA FL= Near surface. Well house, Flow line& Scaffold removed, Cellar has-15"of standing water. ***NOTE***Called for Vac Truck to remove cellar water. Bled IAP for 5 hours (all Gas) SI for BUR, IAP increased 3 psi in 1 hour. Rig down as per WIE. Final WHP's= SSV/3/0. SV, WV&SSV=C. MV=0. IA&OA= OTG. NOVP. 15:30. 12/06/14 SSV/20/0. Temp= SI. WHPs (Post IA&OA bleed). No AL, flowline, scaffolding or wellhouse. IAP increased 17 psi. No change in OAP. SV=?. SSV=C. MV=O. IA, OA=OTG. NOVP. 02:10. 12/07/14 SSV/28/0. Temp=SI. WHPs (Post IA&OA bleed). No AL,flowline, scaffolding or wellhouse. IAP increased 8 psi overnight. No change in OAP. SV=?. WV=C. SSV=C. MV=O. IA, OA=OTG. NOVP. 1415. Page 1 of 1 North America-ALASKA-BP Page 1 01e2 Operation Summary Report Common Well Name:U-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2014 End Date: X3-015F2-C:(4.335,705.00) 1 Project:Prudhoe Bay Site:PB U Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/28/1984 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292114400 Active datum:Kelly Bushing/Rotary Table©76.20usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) i (usft) 12/7/2014 00:00 - 00:30 0.50 MOB i P ' PRE RIG DOWN,PREP TO MOVE OFF OF WELL. COMPLETE PRE-MOVE CHECKLISTS. 00:30 - 01:00 0.50 MOB P PRE PJSM ON RIG MOVING OFF OF WELL. 01:00 - 02:00 1.00 MOB P PRE JACK UP RIG. INSTALL GAUGE ON TOP OF TREE. MOVE RIG OFF OF WELL,DOWN PAD AND STAGE ON EDGE OF PAD TO WORK ON PROJECTS AND WAIT ON SECURITY WITH COMPLETION OF DOYON 16 RIG MOVE 02:00 - 09:00 7.00 MOB N WAIT PRE PREJOB AND SECURE PERMITS FOR PROJECT WORK ON RIG. WELD PAD-EYE ABOVE DRAW-WORKS FOR COIL INJECTOR PULL-BACK. !CUT SMALL SECTION OF TROUGH IN MUD PITS FOR ACCESS TO QUARTER TURN VALVE. I WAIT ON SECURITY DUE TO DOYON 16 RIG MOVE FROM-MILNE POINT TO DS-15. 09:00 - 16:30 7.50 MOB P PRE PJSM. MOVE SATELLITE CAMP TO U-PAD WITH i SECURITY ESCORT. START RIG MOVE DOWN ACCESS ROAD UNTIL SECURITY GOT BACK FROM SATELLITE CAMP MOVE. MOVE RIG FROM W-PAD TO U-PAD. 16:30 - 18:30 2.00 MOB P PRE PJSM. ' LINE UP RIG TO MOVE OVER WELL. 18:30 - 19:30 1.00 MOB P PRE CHECK PRESSURES ON IA(0 PSI),OA(50 PSI),OOA(0 PSI). GAUGE ON OA WAS 6000 PSI GAUGE. CHANGED GAUGE TO 500 PSI GAUGE AND IT i READ 0 PSI. MONITOR OA FOR 30 MINUTES TO ENSURE ' NO BUILDUP. ALL CLEAR TO MOVE RIG OVER WELL. 19:30 - 20:00 0.50 MOB P PRE MOVE RIG OVER WELL 20:00 - 21:00 1.00 MOB P i PRE MOVE STACK OVER IN CELLAR TO BE ABLE TO SET RIG DOWN. SET RIG DOWN,LEVELAND SHIM. RIG ACCEPT AT 21:00 HRS 12/07/2014 21:00 - 22:30 1.50 RIGU P PRE ,RIG UP OVER WELL. I. BURM UP CELLAR. INSTALL IA,OAAND OOA TRANSMITTERS AND GUARDS ON CASINGS. 22:30 - 23:30 1.00 RIGU P PRE LEAK TITE TEST SWAB VALVE ON TREE INSTALL TRANSMITTER ON WING VALVE AND i MONITOR WELL WITH TRANSMITTER. ' NIPPLE DOWN TREE CAP. 23:30 - 00:00 0.50 BOPSUR P PRE PJSM. ' NIPPLE UP BOP STACK TO TREE. 12/8/2014 00:00 - 01:30 1.50 BOPSUR P PRE NIPPLE UP BOP STACK ON TREE. 01:30 02:30 1.00 RIGU P PRE RIG UP RIG FLOOR. RIG UP SLING ON INJECTOR. ' I RIG UP HOT TUB DRAIN BACK TO PITS Printed 12/15/2014 3:11:50PM North America-ALASKA-BP Page 2,og-1 Operation Summary Report Common Well Name:U-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2014 End Date: X3-015F2-C:(4,335,705.00) Project:Prudhoe Bay Site:PB U Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/28/1984 12:00:00AM 'Rig Release: Rig Contractor.NORDIC CALISTA UW:500292114400 Active datum:Kelly Bushing/Rotary Table C76.20usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 102:30 - 05:00 2.50 RIGU P PRE PJSM. SLIP AND CUT 42.62'OF DRILL LINE. 05:00 - 05:30 0.50 RIGU P PRE PERFORM EVAC DRILL. NOTIFIED PAD OPERATOR OF DRILL. PERFORM H2S DRILL. PERFORM FIRE DRILL AAR ON ALL DRILLS. ALL HANDS RESPONDED WELL.NO SIGNIFICANT FINDINGS IN MR. 05:30 - 07:00 1.50 RIGU P PRE SPOT TRUCKS IN TO FILL PITS AND KILL WELL. CLEAR FLOOR,PICK UP TOOLS AND RIG UP TO TEST BOP. 07:00 - 07:30 0.50 DHB P PRE SET BOP TEST PLUG. 07:30 - 08:30 1.00 BOPSUR P PRE I HOLD PRE JOB SAFETY MEETING. FLUID PACK TREE AND PERFORM SHELL TEST ON BOP STACK 08:30 - 13:30 5.00 BOPSUR P PRE TEST BOP. 13:30 - 14:00 0.50 BOPSUR P PRE HOLD RIG EVACUATION DRILL FOR H2S. NOTIFIED PAD OPERATOR AND SECURITY OF DRILL. HOLD MR. FOUND WE SHOULD HAVE CALLED THE NOVEMBER PAD OPERATOR CONSIDERING THE CLOSE PROXIMITY OF N-PAD. 14:00 - 19:30 5.50 BOPSUR P PRE TEST BOP. -AOGCC REP JEFF JONES WAIVED WITNESS TO THIS TEST. -PERFORM BOP SHELL TEST TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. -TEST BOP COMPONENTS PER NORDIC TO 250 PSI LOW/3500 PSI HIGH -CONDUCT ACCUMULATOR DRAWDOWN !TEST FROM CTS CONSOLE ONE PASS/FAIL DURING THIS TEST. BLIND RAMS DID NOT HOLD DURING FIRST ATTEMPT TO TEST.OPENED RAMS AND CLOSED AGAIN.GOT PASSING TEST. 19:30 - 20:00 0.50 RIGU P PRE PULL TEST NEW PADEYE FOR COIL INJECTOR UNIT. DOCUMENT TEST FOR RECORDS. 20:00 - 22:00 2.00 BOPSUR P PRE PUMP 5 BBLS METHANOL FOLLOWED BY 5 BBLS FRESH WATER FOR TESTING. SET SEATS IN#1 MUD PUMP FROM REBUILD. TEST REEL HOUSE HARDLINE TO 250 PSI LOW/3500 PSI HIGH. 'FLUID PACK COIL WITH KCL. 22:00 - 22:30 0.50 BOPSUR P PRE 'TEST INNER REEL VALVES AND PACKOFFS TO 250 PSI LOW/3500 PSI HIGH. 22:30 - 00:00 1.50 BOPSUR P PRE RIG UP AND DISPLACE METHANOL IN COIL. RIG UP AND PUMP BACK E-LINE SLACK. BLOW BACK COIL WITH AIR. RIG UP TO CUT COIL 12/9/2014 00:00 - 01:15 1.25 RIGU P PRE CUT 300'OF COIL TUBING. 01:15 - 01:30 0.25 RIGU P PRE PULL TEST CTC TO 40K Printed 12/15/2014 3:11:50PM • North America-ALASKA-BP Page 3, 1V Operation Summary Report Common Well Name:U-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2014 End Date: X3-015F2-C:(4,335,705.00) j Project:Prudhoe Bay Site:PB U Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/28/1984 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292114400 Active datum:Kelly Bushing/Rotary Table©7620usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) J 01:30 - 02:30 1.00 RIGU P PRE MAKE UP NOZZLE AND PUMP ELINE SLACK FORWARD. BREAK OUT NOZZLE.290'OF ELINE SLACK WAS PUMPED FORWARD THRU BOTTOM HOLE IN NOZZLE. WILL HAVE TO CUT COIL AGAIN AFTER PUMPING SLACK BACK,THEN PUMP SLACK FORWARD AGAIN. 02:30 - 03:00 0.50 RIGU N HMAN PRE CUT 290'OF E-LINE. REBOOT E-LINE. 03:00 - 03:15 0.25 RIGU N HMAN PRE i PUMP SLACK BACK INTO COIL. 03:15 - 04:00 0.75 RIGU N HMAN PRE RIG UP COIL CUTTER AND CUT 300'OF COIL. 04:00 - 04:45 0.75 RIGU N HMAN PRE CUT END OF COIL AND INSTALL COIL TUBING CONNECTOR. 04:45 - 05:00 0.25 RIGU N HMAN PRE PULL TEST CTC TO 45K. 05:00 - 05:30 0.50 RIGU N HMAN PRE RIG UP SVIZZLE STICK AND PUMP SLACK I FORWARD. '- 05:30 05:30 - 05:45 0.25 RIGU P PRE 'BLOW BACK COIL. 05:45 - 06:00 0.25 RIGU P PRE NOTIFIED PAD OPERATOR OF EVACUATION DRILL. EVACUATION DRILL WITH RIG CREW. I H2S DRILL WITH RIG CREW. MR ON DRILLS. ALL HANDS RESPONDED WELL. L06:00 - 06:30 0.50 RIGU P PRE CREW CHANGE HOLD PJSM TO CHECK TREE BOLTS 06:30 - 07:25 0.92 RIGU P PRE GREASE CREW CHECKING TREE BOLTS 07:25 - 07:30 0.08 RIGU P PRE TREE BOLTS ARE GOOD HOLD PJSM TO PU THE INJECTOR,HEAD UP THE UQC,INSTALL DFCVS AND TEST 07:30 - 09:00 1.50 RIGU P PRE PU THE INJECTOR,HEAD UP THE UQC, INSTALL DFCVS AND TEST 09:00 - 10:10 1.17 RIGU P PRE TEST BHI DFCVS STOP TEST TO CIRC COIL TO KEEP FROM FREEZING RETEST FAILED MIGHT BE THERMOL COOLING AS THE WIND IS MAKING ITS WAY TO THE RIG FLOOR 10:10 - 11:20 1.17 RIGU P PRE I CAN NOT GET ATEST BEFORE WE HAVE TO CIRCULATE THE COIL.REMOVE THE DFCVS ' AND PUMP METHANOL IN THE END OF THE COIL TO GIVE US MORE TIME FOR STABILIZATION TO GET A TEST WITHOUT HAVING TO WORRY ABOUT FREEZING UP 11:20 - 12:00 0.67 RIGU P PRE END OF COIL IS FREEZE PROTECTED, INSTALL A NEW SET OF CHECKS AND RETEST 12:00 - 12:30 0.50 RIGU P 1PRE GOOD PT ON BHI DFCVS,RD TEST HOSE _ 'AND MOVE INJECTOR TO THE SIDE 12:30 - 13:00 0.50 RIGU P PRE PULL BOP TEST PLUG 13:00 - 13:10 0.17 RIGU P PRE PJSM WITH VALVE CREW TO LOAD LUBRICATOR&PULLING TOOLS ON THE RIG 13:10 - 13:30 0.33 RIGU P PRE LOAD TOOLS ON RIG 13:30 - 13:45 0.25 RIGU J P PRE HOLD PJSM TO PULL TWC Printed 12/15/2014 3:11:50PM North America-ALASKA-BP Page 41-' Operation Summary Report Common Well Name:U-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2014 End Date: X3-015F2-C:(4,335,705.00) Project:Prudhoe Bay Site:PB U Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/28/1984 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292114400 Active datum:Kelly Bushing/Rotary Table©76.20usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:45 - 15:45 2.00 RIGU P PRE RU PULLING TOOL STAB ON WELL PT LOW/HIGH PRESSURE GOOD PT,OPEN SWAB,SSV,&MASTER 0 PSI ON TREE,RETRIEVE TWC 110 PSI ON WELL PULL TWC ABOVE THE SWAB,CLOSE THE MASTER AND BLEED OFF PRESSURE TO THE TT PRESSURE BLED OFF,NO FLOW CLOSE THE SSV AND CHECK FOR FLOW NO FLOW,CLOSE THE SWAB AND RD LUBRICATOR 15:45 - 16:10 0.42 RIGU P PRE LOAD OUT VC TOOLS 16:10 - 17:15 1.08 BOPSUR P PRE CHECK TT LINE TO ENSURE ITS CLEAR LOOKS LIKE WE HAVE A LITTLE ICE PLUG AT THE CHICKSAN ON THE GROUND USE STEAM TO THAW BEFORE OPENING UP TO BULLHEAD KILL THE WELL 17:15 - 17:30 0.25 BOPSUR P PRE PJSM TO BH KILL THE WELL 17:30 - 17:50 0.33 BOPSUR P PRE PU THE INJECTOR,PT THE QTS AND PREP TO BH KILL WELL PT THE QTS 17:50 - 18:00 0.17 BOPSUR P PRE OPEN UP TO THE WELL,WHP=105 PSI,NO BH KILL HISTORY IN DIGITAL WELL FILE PUMP A FEW BBLS OF METHANOL TO SEE IF THE WELL WILL TAKE FLUID 18:00 - 18:30 0.50 BOPSUR P PRE ONLINE WITH METHANOL AT 3.5 BPM,WELL TAKING FLUID NIGHT CREWARRIVING WAIT TO START BH KILL AFTER CHANGE OUT 18:30 - 18:45 0.25 BOPSUR P PRE CREW CHANGE 18:45 - 19:40 0.92 BOPSUR P PRE START BH KILL ONLINE WITH 5 BBLS OF METHANOL FOLLOWED BY KCL 5.3 BPM AT 161 PSI 20 BBLS AWAY 30 BBLS AWAY WE ARE AT 3500 PSI AT 2.2 BPM 35 BBLS AWAY WE ARE AT 3500 PSI AT 1.2 BPM 38 BBLS AWAY 3500 PSI 0 BPM AND HOLDING LINE UP TO TAKE RETURNS TO THE TT BLEED OFF WHP AND CIRC COIL TO KEEP WARM WHILE CALLING WTL,DRLG SUPT& ODE HAVE APPROVAL FROM WTL TO RIH AND DO A BOTTOMS UP KILL CALLED DRLG SUPT AND DISCUSSED THE BOTTOMS UP KILL PLAN IN THE WELL PLAN CALLED ODE AND LET HIM KNOW WE WILL NEED TO DO A BOTTOMS UP KILL 19:40 - 21:00 1.33 BOPSUR P PRE SHUT WELL IN WHILE CIRCUALTING THE COIL TO THE TT SPOT METHANOL PUP TO FREEZE PROTECT THE TT LINE PUMP SLACK FORWARD WHILE COMING UP WITH A PLAN FORWARD TO RIH AND PUMP A BOTTOMS UP KILL 21:00 - 21:15 0.25 BOPSUR P PRE PJSM FOR MAKING UP NOZZLE BHAAND BOTTOM KILL. Printed 12/15/2014 3:11:50PM • North America-ALASKA-BP Page 5eI4t Operation Summary Report Common Well Name:U-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2014 End Date: X3-015F2-C:(4,335,705.00) Project:Prudhoe Bay Site:PB U Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/28/1984 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292114400 Active datum:Kelly Bushing/Rotary Table©76.20usft(above Mean Sea Level) Date From-To I Hrs Task j Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:15 - 21:45 0.50 BOPSUR P PRE MU NOZZLE BHA AND STAB ON INJECTOR. 21:45 - 22:00 0.25 BOPSUR P PRE TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. 22:00 - 00:00 2.00 BOPSUR P PRE BOTTOM KILL WELL. -OPEN WELL TO CLOSED CHOKE;50 PSI WHP. RIH AT 1.4 BPM IN,HOLDING WHP<250 PSI AND<150 PSI DOWNSTREAM OF CHOKE WITH 1/1 RETURNS. -NO RETURNS;GAS TO FLOWBACK TANK FROM 1400'TO 11,500'. 12/10/2014 00:00 - 02:00 2.00 BOPSUR P PRE 1BOTTOM KILL WELL. -CIRCULATE BOTTOMS UP AT MAX RATE AND GET 1/1 RETURNS BACK-5 BBLS INTO BOTTOMS UP. -OUT DENSITY STABILZE AT 8.3 PPG-110 BBLS INTO BOTTOMS UP. -COMPLETE BOTTOMS UP WITH 120 BBLS TO FLOWBACK TANKS AND SWAP TO MGS FOR SECOND BOTTOMS UP. -CIRCULATE 120 BBLS THROUGH MGS. 02:00 - 02:15 0.25 BOPSUR P PRE FLOW CHECK;STATIC. 02:15 - 03:15 1.00 BOPSUR P PRE DISPLACE KCL TO 9.5 PPG POWERVIS DRILLING MUD. _ 03:15 - 05:15 2.00 BOPSUR P PRE POH WITH NOZZLE BHA. -FLOW CHECK;STATIC. -POH AT 100 FPM. -PVT START=296 BBLS. IN/OUT RATE=2.8 /2.3 BPM. IN/OUT DENSITY=9.5/9.5 PPG. 05:15 - 05:30 0.25 BOPSUR P PRE PJSM FOR HANDLING BHA. -FLOW CHECK;STATIC. -PVT=240 BBLS;NO LOSSES. 05:30 - 06:15 0.75 STWHIP P WEXIT LD NOZZLE BHAAND MU BAKER WHIPSTOCK BHA. 06:15 - 06:45 0.50 STWHIP P WEXIT STAB ON INJECTOR AND PRESSURE TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. 06:45 - 09:15 2.50 STWHIP P WEXIT GOOD TEST,RIH 09:15 - 09:50 0.58 STWHIP P WEXIT LOG GAMMA TIE IN 09:50 - 09:55 0.08 STWHIP P WEXIT CORRECT DEPTH-10' PU TO 10900'AND LOG CCL DOWN TO 11300' 09:55 - 10:25 0.50 STWHIP P WEXIT ,SWAP TOOL TO LOG CCL THEN LOG DOWN ATO 11300' 10:25 - 10:35 0.17 STWHIP P WEXIT STOP AT LOGGING,WO CCL Printed 12/15/2014 3.11:50PM • • North America-ALASKA-BP Page 6-ear Operation Summary Report Common Well Name:U-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2014 End Date: X3-015F2-C:(4,335,705.00) li Project:Prudhoe Bay Site:PB U Pad -- Rig Name/No.:NORDIC 1 Spud Dateffime:7/28/1984 12:00:00AM Rig Release: Rig Contractor.NORDIC CALISTA UW:500292114400 Active datum:Kelly Bushing/Rotary Table @76.20usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 10:35 - 10:50 0.25 STWHIP P WEXIT WE ARE ON DEPTH WITH THE CCL IN THE WELL PLAN TOP COLLAR AT 11,151'BOTTOM COLLAR AT 11,191' PU AND GETUP WT,UP WT =42K RIH Wi= • 19K TOWS TO BULLNOSE =15.72' STOP AT 11,169.72-15.72=11,154'TOWS PU TO 38K AND STOP,CLOSE THE EDC AND SET WS ON DEPTH AT 30"LOHS ZERO WOB AND SET WS SETTING TOOL SHEARED AT 2900 PSI SET DOWN 5.42K NO MOVEMENT,MAX WOB FOR 2-7/8 XTREME MOTOR IS 4.72K PU AND WE ARE FREE 10:50 - 11:00 0.17 STWHIP P WEXIT FLOW CHECK WELL 11:00 - 13:10 2.17 STWHIP P WEXIT GOOD NO FLOW,POOH 7500'STOP TO CHECK PVT VOLUME,IN& OUT MICRO MOTIONS ARE DEAD ON FOR POOH VOLUMES,PVT IS SHOWING ALMOST NO DROP FOR THE LAST 1000' ALL PITS ARE EQUALIZED BUT PIT 1 IS HIGHER THAN THE REST AND VERY AIRED UP,ADD DEFOAMER. 13:10 - 13:25 0.25 STWHIP P WEXIT FLOW CHECK WELL HOLD PJSM TO LD THE WS SETTING BHA AND MU THE MILLING BHA '13:25 - 14:00 0.58 STWHIP P WEXIT TAG UP,REMOVE THE INJECTOR AND LD THE BHA 14:00 - 14:30 0.50 STWHIP P WEXIT BHAOOH,MU MILLING BHA 14:30 - 14:45 0.25 STWHIP P WEXIT PT THE QTS 14:45 - 16:40 1.92 STWHIP P WEXIT GOOD PT,RIH 16:40 - 16:55 0.25 STWHIP P WEXIT LOG TIE IN 16:55 - 17:00 0.08 STWHIP P WEXIT CORRECT DEPTH-11',CLOSE THE EDC AND RIH TO TAG THE PINCH POINT AND START MILLING THE WINDOW 17:00 - 17:20 0.33 STWHIP P WEXIT RIH,DRY TAG PINCH POINT AT 11156',PU AND START PUMP AND ZERO WOB 17:20 20:00 2.67 STWHIP P WEXIT 11,155.0'WE HAVE WOB AND MOTOR WORK 9a-04I PAINT FLAG ON PIPE AND START MILLING THE WINDOW V FREE SPIN=2530 PSI AT 2.79 BPM RATE IN=2.79 BPM RATE OUT=2.78 BPM MW IN=9.53 PPG MW OUT=9.54 PPG ECD =10.73 PPG ROP=1 FPH WOB=0.16 K CIRC PSI= 2556 PSI IAP=111 PSI OAP=0 PSI PVT=311 BBLS 20:00 - 22:00 2.00 STWHIP P WEXIT FREE SPIN=2530 PSI AT 2.79 BPM RATE IN=2.75 BPM RATE OUT=2.75 BPM MW IN=9.53 PPG MW OUT=9.54 PPG ECD =10.7 PPG ROP=1 FPH WOB=2.5K CIRC PSI=2600 PSI _ _._.. IAP=132 PSI OAP=0 PSI PVT=312 BBLS Printed 12/15/2014 3:11:50PM • • North America-ALASKA-BP Page 7 dad Operation Summary Report Common Well Name:U-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2014 End Date: X3-015F2-C:(4,335,705.00) Project:Prudhoe Bay Site:PB U Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/28/1984 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292114400 Active datum:Kelly Bushing/Rotary Table @76.20usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:00 - 00:00 2.00 STWHIP P WEXIT FREE SPIN=2530 PSI AT 2.79 BPM RATE IN=2.74 BPM RATE OUT=2.74 BPM MW IN=9.52 PPG MW OUT=9.51 PPG ECD 10.7 PPG ROP=1 FPH WOB=1.5 K CIRC PSI=2550 PSI IAP=140 PSI OAP=0 PSI PVT=312 BBLS 12/11/2014 00:00 - 02:00 2.00 STWHIP P WEXIT FREE SPIN=2530 PSI AT 2.79 BPM RATE IN=2.77 BPM RATE OUT=2.78 BPM MW IN=9.52 PPG MW OUT=9.50 PPG ECD 10.7 PPG 'ROP=1 FPH WOB=0.8 K CIRC PSI=2570 PSI IAP=151 PSI OAP=5 PSI PVT=311 BBLS 02:00 - 04:00 2.00 STWHIP P WEXIT FREE SPIN=2530 PSI AT 2.79 BPM RATE IN=2.77 BPM RATE OUT=2.78 BPM MW IN=9.52 PPG MW OUT=9.50 PPG ECD =10.7 PPG ROP=1 FPH WOB=1.4 K CIRC PSI=2660 PSI IAP=159 PSI OAP=5 PSI PVT=310 BBLS 04:00 - 05:15 1.25 STWHIP P WEXIT MILL WINDOW -MILL TO BOTTOM OF WINDOW AT 11,164' -CONTROL MILL+1.5'TO 11,165.5'TO REAM BOTTOM OF WINDOW -IN/OUT RATE=2.7 BPM. IN/OUT MW=9.5 /9.5 PPG. CIRC=2600 PSI. PVT=310 BBLS (NO LOSSES) 05:15 - 06:45 1.50 STWHIP P WEXIT MILL RATHOLE -INCREASE WOB TO 3-4 KAND MILL NEW FORMATION FROM 11,165.5' -IN/OUT RATE=2.8 BPM. IN/OUT MW=9.5 PPG. CIRC=2800 PSI 06:45 - 07:05 0.33 STWHIP P WEXIT MILLED 9'OF FORMATION,START HIGH VIS PILL 07:05 - 08:40 1.58 STWHIP P WEXIT 1DRILLED 10'OF RAT HOLE,START REAMING PASSES 08:40 - 08:50 0.17 STWHIP P WEXIT MADE 3 REAMING PASSES IN BOTH DIRECTIONS,DRY DRIFT WINDOW 08:50 - 09:00 0.17 STWHIP P WEXIT DRY DRIFT CLEAN IN BOTH DIRECTIONS FLOW CHECK WELL AND POOH 09:00 - 10:10 1.17 STWHIP P WEXIT GOOD NO FLOW,POOH 10:10 - 10:20 0.17 STWHIP P WEXIT WE ARE SEEING A+0.9 BBL DISCREPANCY BETWEEN THE IN&OUT MM AND PVT 10:20 - 10:30 0.17 STWHIP P WEXIT GOOD NO FLOW ONLINE WITH PUMP,IN&OUT RATES 1:1 AND DENSITY'S ARE BOTH 9.50 PPG POOH 1000'AND CHECK VOLUMES AGAIN 10:30 - 10:40 0.17 STWHIP P WEXIT VOLUMES ARE GOOD,CONTINUE POOH 10:40 - 10:50 0.17 STWHIP P WEXIT IN&OUT MM VOLUMS ARE GOOD BUT THE PVT IS SHOWING A 0.9 BBL GAIN THE OUT MM RATE ON THE CTDS GRAPH IS NOT AS STEADY AS THE IN RATE AND IT LOOKS LIKE IT MIGHT BE PACKED OFF WITH STEEL FROM CUTTING THE WINDOW WHICH IN TURN WOULD AIRIATE THE MUD AND CAUSING THE PVT TO BE OFF SHUT DOWN THE PUMP TO FLOW CHECK THE WELL AND BLOW DOWN THE OUT MM Printed 12/15/2014 3:11:50PM TREE= * QIN4-1/16" S> NOTES: WELL ANGLE>70" 11127' )/VELLI-EAD= 4"McEVOY U -09A_O9 ACTUATOR= BAKER C OKB.aEv= 84.18' BF.BEV= 49.08' I R D 10601' H9-5/8"X 4-1/2'BKR SAB-3 FK =3.875" KOP= 2092' Max Angle= 102°@ 12060' ' , 2020' -4-112"HES X NP,D=3.813" Datum MD= 10999' Datum IVD= 8800'SS pi GAS LFT MANDRELS 20"X 30"INSULATED CONDUCTOR,D= --{ —110 ST MD TVD DEV TYFE VLV LATCH PORT DATE 13-3/8°CSG,72#,L-80 BUTT,D=12.347' —I 2704' , 5 3185 3059'38 CAMCO DM' RK 0 04/15/99 4 4529 4084'38 CAMCO MAY RK 0 03/07/14 3 6769 5771'43 CAMOO OW RK 0 03/07/14 2 8793 7271'41 CAMCO DRAY RK 0 03/07/14 Minimum ID = 3.80" @ 10709' 1 10462 8474'42 CAMCO OW RK 0 03/07/14 4-1/2" HES XN NIPPLE I I 10490" H4-1/2"1 tz X NN',D=3.813" x 10501' —19-5/8"X 4-1/2'BKR S-3 PKR,D=3.875" ' ' 10526' H4-1/2"HES X NP,D=3.813" TOP OF 7"LNR H 10605' IIt ' ' 10709' H4-1/2'HES XN NP,?ALLIED TO 3.80"(04/10/14) TOP OF 4-1/2"LNR — 10719' 10719' H7'X 5'ZXP LTP w/I-NC HGR,D=4.437" 4-1/2"TBG,12.6#,L-80 6T,.0152 bpf,D=3.958' H 10721' 10721' I—4-1/2'WLEG,D=4.00" � j --SMD TT NOT LOGGED / iii 10733' H7"X 5'BKR HMC HGR,13=4.437" 10739' H5'X 4-1/2"XO,ID=3.937' 9-5/8"CSG,47#,L-80 BUTT,D=8.681" —{ 10858' I--• I. MLLOUT WINDOW (U-09A)10863'-10875' TOP OF WhI STOCK H 10863' 11054' H7"MARKER DONT 11155' -1 WHPSTOCK(12/10/14) 7"LAP,26#,L-80 U4S,.0383 bpf,D=6.276" * 11386' PERFORATION SUMMARY REF LOG: SWS BHC ON 11/29/98 r1�1�1�1�1�1�1�1 ? —{FISH 14'OF 2-7/8"TBG ANGLE AT TOP FERF:1000 @ 11844' 11111111111111111 111111111 A., Note:Refer to Roduction DB for historical perf data 11111111 SIZE SFF INTERVAL Opn/Sgz SHOT SQZ 111111111111111 k`\\\�.` 2-7/8" 4 11844-11894 0 02/21/02 11111111111111111 "��__ 2-7/8" 4 12128-12220 0 12/17/98 '141616.41616.611 .\\ v .y 2-7/8" 4 12234-12270 0 12/17/98 PBTD H 12799' 2-78" 4 12290-12318 0 12/17)98 2-78" 4 12348-12400 0 12/17/98 4-1/2"LNR,12.6#,L-80 EIT,.0152 bpf,D=3.953" —1 12885' 2-78" 4 12416-12516 0 12/17/98 2-78" 4 12540-12590 0 12/17/98 DALE REV BY COMMENTS DATE REV BY COMvu'ITS PRUDHOE BAY UNIT 08/14/84 ALAI 2 ORIGINAL COMPLETION 04/14/14 DM PJC MILL XN NIP(04/10/14) WELL: U-09A 12/21/98 N9E5 SDTRK COMPLETION RIG 9ES 04/28/14 PJC DRAWING CORRECTIONS FERMI'No:'1982120 12/16/11 SET/PJC SET PX PLUG(11/26/11) 05/01/14 PJC LNR,CSG CORRECTIONS AFI No: 50-029-21144-01 05/23/12 JMO/JMD TREE C/O(05/21/12) ' 11/25/14 PJC ADD MARKER JOINT FOR 7" SEC 19,T11N,R13E,168'FNL 8 1853'FEL 05/29/12 GJF/JM) FULLED FX FLOG(05/24/12) , 03/12/14 LEC/JMD GLV 0/0(03/07/14) BP Exploration(Alaska) Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: [] Other - Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS:. Scanned by: Beverly Mildred Daretha Lowell Date: ~//'~"/ /si ~__.,. [] TO RE-SCAN Notes: Re-Scanned by: Bevedy Mildred Damtha Nathan Lowell Date: /si • • Page 1 - )f 1 Regg, James B (DOA) From: Grimaldi, Louis R (DOA) P&t. 1.'c- Sent: Monday, November 28, 2011 8:31 AM � � 11 ` ((I l rl 0 21 z To: DOA AOGCC Prudhoe Bay �� ( I Cc: Schwartz, Guy L (DOA) Received call from Ken Bulloch who is sitting in for Tyler Noreen ( ?). Nordic One CTD on PBU U -09 was evacuated for 19PPM H2S this morning. Well has pipe in the hole and BOP's are closed, well secured using Hard Shut -in method. Containment seems adequate with no injuries or releases reported. Abbie Barker is company rep. I asked Ken to have us notified as soon as they get back in the rig and ascertain well status. Louis R. Grimaldi Petroleum Inspector Alaska Oil and Gas Conservation Commission North Slope Pager 907 - 659 -3607 Home 907 - 776 -5402 Cell 907-252-3409 11/28/2011 • y r t I 'F e r bp BP Exploration (Alaska) Inc. k �n Attn: Well Integrity Coordinator, PRB -20 ' Post Office Box 196612 Anchorage, Alaska 99519 -6612 410r'p ►E f Corr ', - $ncfl December 20, 2010 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7 Avenue Anchorage, Alaska 99501 o 911 Subject: Corrosion. Inhibitor Treatments of GPB U Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from U Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Jerry Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator 0 • BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) U -pad Date: 12/20/10 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft . bbls ft na gal U - 1920110 50029222440000 NA 0.8 NA 3.4 1/12/2010 U -02A 1p82390 50029211700100 NA 0.6 NA 1.7 1/12/2010 U -03 1841470 50029211730000 NA 0.4 NA 1.7 1/12/2010 U -05A 2090700 50029211920100 NA 0.6 NA 3.4 1/12/2010 U -068 ' 2050640 50029211170200 NA 1.9 NA 15.3 1/13/2010 U -07 1840900 50029211270000 NA 0.6 NA 5.1 1/13/2010 U -08A 1982020 50029211360100 NA 1.4 NA 8.5 1/13/2010 U-09 , 1982120 50029211440100 NA 0.2 NA 1.7 1/13/2010 U -10 1851970 50029214230000 NA 7.7 NA 57.8 12/28/2009 U -11B 1931080 50029214200200 NA 0.8 NA 5.1 1/13/2010 U -12A 2041470 50029214090100 NA 0.6 NA 3.4 1/12/2010 U -13 1781010 50029203550000 NA 0.1 NA 3.4 1/12/2010 U -14 1931000 50029223860000 NA 0.1 NA 1.7 1/13/2010 U -158 2011970 50029225650200 NA 1.4 NA 13.6 1/13/2010 RE: PBU U-09A Subject: RE: PBU U-09A Date: Thu, 23 Oct 2003 17:39:42 -0500 From: "NSU, ADW Well Integrity Engineer" <NSUADWWelllntegrityEngineer~BP.com> To: Jim Regg <jim_regg~admin.state.ak.us> "'~c~ ~o1~'3l O3 CC: Winton G Aubert <winton_aubert~admin.state.ak.us>, "NSU, ADW Well Integrity Engineer" <NSUADWWelllntegrityEngineer~BP.com> Hi Jim, The field report for the MITOA is shown below. 8/8/2003: T/I/0=300/1800/820. Temp=138* MIT-OA to 2400 psi PASSED (WC). OA FL @ 60' or 3.5 bbls. Bled OAP from 820 psi to 10 psi in 17 min. Pressure OA to 2400 psi. Start first test. OAP lost 0 psi in 1st 15 min and 0 psi in 2nd 15 min for a total of 0 psi in 30 min. Pumped 5.8 bbls of diesel. Bled OAP to 20 psi. Monitor for 30 min. OAP increased 60 psi. Final WHP's=300/1800/80. Please let me know if you would like me to fax you a copy of the pump report. Thanks, John Cubbon GPB Well Integrity Coordinator 1-907-659-5102 pgr. 659-5100, x. 1154 ..... Original Message ..... From: Jim Regg [mailto:jim regg@admin.state.ak.us] Sent: Thursday, October 23, 2003 2:11 PM To: NSU, ADW Well Integrity Engineer Cc: Winton G Aubert Subject: PBU U-09A Well currently has internal BP waiver to 2000 psi in OA; requires annual MITOA (waiver date was 9/15/02); please forward the results of most recent MITOA for our review. Jim Regg 1 ofl 10/23/2003 3:01 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _X Plugging _ Perforate _ ACID TREATMENT Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 5. Type of Well: Development __X Explorato~__ Stratigraphic__ Service__ 4. Location of well at surface 168' FNL, 1852' FEL, Sec. 19, T11N, R13E, UM At top of productive interval 4466' FNL, 3372' FEL, Sec. 20, T11N, R13E, UM At effective depth 4037' FNL, 1767' FEL, Sec. 20, T11N, R13E, UM At total depth 4001' FNL, 1675' FEL, Sec. 20, T11N, R13E, UM (asp's 632155, 5960416) (asp's 636007, 5956186) (asp's 637602, 5956644) (asp's 637693, 5956681) 12. Present well condition summary Total depth: measured true vertical 12891 feet Plugs (measured) 9047 feet 6. Datum elevation (DF or KB feet) RKB 76 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number U-09A 9' ~er ~ap(~r°~' n u~,~ir 10. APl number 50-029-21144-01 11. Field / Pool Prudhoe Bay Field / Prudhoe Bay Pool Effective depth: measured 12789 feet Junk (measured) true vertical 9017 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 110' 20" 72 cf Concrete 139' 139' 3720 cf Permafrost 'E' & Surface 2675' 13-3/8" 2704' 2662' PF II Production 10829' 9-5/8" 2088 cf 'G', 230 cf 'G', 10858' 8778' 279 cf PF 'C' Liner 258' 7" 288 cf Class 'G' 10605' - 10863' 8582' - 8782' 2166' 4-1/2" 326 cf Class 'G' 10719' - 12885' 8670' - 9045' Perforation depth: measured Open Perfs 11844'-11894', 12128'-12220', 12234'-12270', 12290'-12318', 12348'-12400', 12416'-12516', 12540'-12590' true vertical Open Perfs 8990'-8982', 8937'-8927', 8925'-8923', 8921'-8920', 8919'-8920', 8921'-8940', 8947'-8960' Tubing (size, grade, and measured depth) 4-1/2" 12.6# L-80 TBG @ 10721'. Packers & SSSV (type & measured depth) 9-5/8" x 4-1/2" BKR SAB-3 Packer @ 10501' MD. 4-1/2" HES SSSV X Nipple @ 2020' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation 06/11/02 Subsequent to operation 06/27/02 OiI-Bbl 310 Representative Daily Average Production or Iniection Data Gas-Mcf Water-Bbl 944 2651 478 1082 3856 Casing Pressure Tubing Pressure 208 192 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 16. Status of well classification as: Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ,~~~~ ,~~~ Title: Technical Assistant DeWayne R. Schnorr Form 10-404 Rev 06/15/88 · ORiGiixiAL Date June 28, 2002 SUBMIT IN DUPLICATE U-09A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 05/31/2002 ACID: AC-TIFL 06/08/2002 ACID: DRIFT/TAG 06/15/2002 ACID: ACID TREATMENT 06/16/2002 ACID: ACID TREATMENT 06/17/2002 ACID: ACID TREATMENT 06/18/2002 ACID: ACID TREATMENT EVENT SUMMARY 05/31/02 TIFL PASSED (PRE ACID STIMULATION). INITIAL IAP=1850 PSI, IA FL AT 10,462'. INITIAL TP =1550 PSI. BLED IA TO 710 PSI IN 3 HOURS AND 40 MIN. FINAL IA FL AT 10,462'. 06~08/02 RAN 3.50" DUMMY GUN TO 10883' SLM AND STOPPED DUE DEVAITION . SECURED WELL. NOTIFIED DSO OF WELL STATUS. WELL TO BE POP. 06/15/O2 CT STRADDLE ACID STIM- MIRU DS CTU #5- KILL WELL WITH FILTERED 2% KCL. RIH WITH MEM GR/CCL AND 3.5" NOZZLE. TAGGED AT 12579' CTD. LINED UP TO WASH DOWN WITH 12% HCL ACID. 06/16/02 CT STRADDLE ACID STIM- RIH AND TAGGED @ 12579' CTD, WASHED WITH 50 BBLS 12% ACID TO 12650'-12120'. MEM/GR/CCL LOG TO 12600', LOG UP TO 11400'. FLAG PIPE AT 11570' CTD. RIH WITH WFD STRADDLE PACKER. CONDUCT BLANK PIPE TEST. STIMULATE ZONES 12545'-12565' AND 12485'- 12505'. 06/17/O2 CT STRADDLE ACID STIM- CONTINUED FROM 06/16/2002 WSR --- STIMULATE INTERVALS 12445'-12465', 12360'-12380', 12240'-12260', 12170'-12190', 12140'- 12160'. GOOD RESPONSE TO ACID STIM. FINAL BLANK PIPE TEST INDICATES BOTTOM ELEMENT SETTING BUT NOT TOP. WELL ON VAC SETTING PACKER, DROP CIRC-SUB BALL. RIH 200' PUSHING PACKER. PUH PACKER FREE. 06/18/O2 ACID STIM COMPLETED. TAGGED UP ON SURFACE WITH ALL TOOLS. LOSE A "JET" FROM WFD STRADDLE PACKER BUT ELEMENTS LOOK GOOD. <<< PAD OPERATOR TO POP >>>. Fluids Pumped BBLS 1 PRESSURE TEST SURFACE PRESSURE CONTROL EQUIPMENT WITH DIESEL ( 1 TEST) 5 50/50 METHANOL WATER 580 2% KCL WATER 400 DIESEL WITH U-SS 75 L-47 75 12% HCL TITRATED TO 11.9%, IRON 22 PPM. 1136 TOTAL Page 1 SCANNED JUL ! 0 2002 MEMORANDUM TO: THRU: State of Alaska Alaska Oil and Gas Conservation Commission ~. ...~. Julie Heusser,~,,~Y.::, .,,,'~':,- DATE: April 17, 2001 Commissioner ~.~ Tom Maunder, P. I. Supervisor ¼\'~o ' % \ FROM: Lou Gdmaldi, SUBJECT: Petroleum Inspector SVS Tests BPX U-pad Prudhoe Bay Field Tuesday. April 17, 200.1; I witnessed the Semi-Annual SVS tests on BPX U pad in the Western Operating Area of the Prudhoe Bay Field. Merv Liddelow performed the SVS tests today. The test results (No Failures) are noted on the accompanied SVS test spreadsheet. All well houses were in "OK" condition. The pad was clean and in good condition. SUMMARY: I witnessed the SVS test on U pad in the Prudhoe Bay Field. 2 wells, 6 components, No failures. .Attachmen.t.s: SVS PBU U pad 4-1,01 LG.XLS NON-CONFIDENTIA.L SVS PBU U pad 4-17-01 LG Al~ska Oil and Gas Conservation CommiS~i-on Safety Valve System Test Report Operator: BPX Submitted By: Lou Grimaldi Date: 17-Apr Operator Rep: Merv Liddelow Field/Unit/Pad: ,Pruh0e' B..a.y Field, U p,ad AOGCC Rep: Lou Grimaldi Separator psi: LPS 159 HPS' i ...... i i i . .i i ~ i . i i i Well Permit Separ Set L/P Test Test Test Date oil, WAG, GINJ, Number Number PSI PSI Trip Code Code Code Passed GAS or CYCL~ U-02A 1982590 ' '159 125 115 P P " OIL U-06A 1990760 ...... U-07 1840900 U-08A 1982020 u-09A 1'982120 "159 125 100 P P OIL U-11B 1931080 159 125 90 P P oIL U-12 1851820 u-13 ' i7'8101b ~59 125~ i10 p p " o~L ,U-14 '19'31000 '" 159 125 100 P P " oil ilj-15A 1950970 Wells: 5 Components: 10 Failures: 0 Failure Rate: 0.00% [3 90 ~av Remarks: RJF 1/16/01 Page 1 ofl SVS PBUU pad 4-17-01LG Schlumberger NO. 12878 Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Tarn Pool Color Well Job # Log Description Date BL Sepia Print CD 1 E-36 DEPTH CONTROL MEMORY GR/CCL 991010 I 1 2C-10 PRODUCTION PROFILE W/PSP 991010 I 1 2G-11 PRODUCTION PROFILE W/PSP 991012 I 1 2N-325 L.~,¢ .... 99354 RST "~-'q'~5,'~ 990829 I 1 1 c SIGNED:'~I ~~ DATE: !)1":'~' 2 7 1999 AI~ 011 & Gas Cons. Commission Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thee 10/21/99 D F! I I--I--I I~ 13 SEI~IVICE S To: WELL LOG TRANSMrrrAL State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Loft Taylor 3001 Porcupine Drive Anchorage, Alaska 99501 q ~- ~ ( MWD Formation Evaluation Logs U-09A, Jtme 1, 1999 AK-MM-90011 U-09A: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-21144-01 2" x 5" TVD Resistivity & Cramma Ray Logs: 50-029-21144 Ol 1 Blueline 1 Rolled Sepia 1 Blueline 1 Rolled Sepia PLEASE ACKNOWLEDGE RECE1PT BY SIGNING AND RETURNING A COPY OF THE TRANSMITYAL LETYER TO THE A'UFENTION OF: · Sperry-Sun Drilling Services Atto: Yum Galvin 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 RECEIVED Date:JUN 0:3 1999 Al~ImOil&G~~,~n BP Exploration (Alaska) Inc. Petro-teehnieal Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company ra ICl I I_1_ I I~l CS S ~:: I:i~/I C ~ S To: State of Alasjta ~May 27,-1999 Alaska Oil 0nd Gas Conserv~n Corem Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD. Formation Evaluation Logs U-09A AK-MW-90011 1 LDWG forn~__~ Disc~vdth.vexifim~nlisting. APl#: 50-029-21144-01 PLEASE ACKNO~LEIN~E l~"CEIPf ]~¥- SIGNING A/q~RE-~THE.-_,¥1rF.~COPtES- OF THE TRANSM1TFAL LETTER TO THE ATTENTION OF: Sperry-Sun ~ Services Attn: Tun Galyi~ 5631 Silverado. Way, Suite G. Anchorage, Alaska 99518 RECEIVED Alaska 0ii & Gas Cons. Commission Anchorage xploratm (A aska). t.o. - Petm4echnical-Data Center,-MB3-3 .900_E Benson Birr[ Anchorage, Alaska 99519-6612 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company L~'~*.,'"h,l,, ,:~'~_,-~ J.. GeoQuest 3940 Arctic Bird Anchorage, AK 99503 All'N: Sherrie NO. 12324 Company Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 2/12/99 Field: Prudhoe Bay (Open Hole) LIS Well Job # Log Description Date BL Sepia Tape U-09A ~ ~'cl '"/~ 99037 PEX/BHC/HALS (PDC) 981129 1 U-09A 99037 PEX/HALS 981129 1 1 U-09A 99037 PEX/MCFL 981129 1 1 U-09A 99037 PEX/CNL 981129 1 1 U-09A 99037 PEX/3 DET DEN CNL 981129 1 1 U-09A 99037 PEX/BHC 981129 I 1 U-09A 99037 PEX/SSTVD 981129 1 1 R-17A ~ ~~ 99025 IMPULSE/GR/RES 980902 1 1 i Z-35 ~ ~'~ 99039 SLIM PEX/AIT (PDC) 980811 1 Z-35 99039 SLIM AlT 980811 1 1 Z-35 99039 SLIM CNL 980811 1 1 Z-35 99039 SLIM CNL/LDT 980811 1 1 Z-35 99039 SLIM SSTVD 980811 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO'-----~'~)' ~ ~'C.'~"~ BP Exploration (Alaska)Inc. ~cnlum~e~r ~eo~uest ~~ ~ *~.:.~ Petrotectnical Data Center MB3-3 3940 Arctic Blvd Anchorage, Alaska 99519-6612 Date Delivered: r.:'p, 18 1999 Gas Cons. Anchorage, AK ATTN: She%..,,,xV Receive~ STATE OF ALASKA r' i:,~!:? ~,¢ ,'' .......... ..¢ ?q'?~:t-,'~-'' ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND ..... 1. Status of Well Classification of Service Well [] Oil I--1 Gas [] Suspended E~ Abandoned E~] Service 2. Name of Operator ~.~ Permit Number BP Exploration (Alaska)Inc.! ~'84-212 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21144-01 4. Location of well at surface i' :::~r'~'L ?:L' --- ~~~ 9. Unit or Lease Name 168'SNL, 1852'WEL, SEC. 19, T11N, R13E, UM i -",;ii::'::' ~ _~~ Prudhoe Bay Unit At top of productive interval !/~,/,j~,et,¢ i '.-iI~,l_,~_,,~_ i~ ii10' Well Number 4466' SNL, 1908' EWL, SEC. 20, T11N, R13E, UM At total depth ~ 11. Field and Pool 4000' SNL, 3619' EWL, SEC. 20, T11N, R13E, UM '- ~ L-; '-.~ Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE = 76.20'I ADL 028283 12. Date Spudded11/22/98 113' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'115' Water depth' if OffshOre 116' NO' Of COmpletiOns11 ~27~98 12118~98 N/A MSLI One 17. Total Depth (MD+TVD)I18. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 12891 9047 FTI 12799 9020 FTI [~Yes ~]No (Nipple) 2020' MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, RES, RES/AlT, DT/BHC, CNL, LDL, GR, Caliper, SP, MRES 23. CASlNG~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" X 30" Insulated Conductor Surface 110' 36" 8 cu yds concrete 13-3/8" 72# L-80 Surface 2704' 17-1/4" 3720 cu ft Permafrost 'E' and PF II 9-5/8" 47# L-80 Surface 10858' 12-1/4" 2088 cu ft 'G', 230 cu ft 'G', 279 cu ft PF 'C' 7" 26# L-80 10605' 10863' 8-1/2" 288 cuft Class 'G' 4-1/2" 12.6# L-80 10719' 12885' 6" 326 cuft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-7/8" Gun Diameter, 4 spf 4-1/2", 12.6#, L-80 10721' 10501' MD TVD MD TVD 12128' - 12220' 8937' - 8927' 12234' - 12270' 8925' - 8923' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 12290' - 12318' 8921' - 8920' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 12348' - 12400' 8919' - 8920' 12416' - 12516' 8921' - 8940' Freeze Protect with 150 Bbls of Diesel 12540' - 12590' 8947' - 8960' 27. PRODUCTION TEST 0Ri Sii',iAL Date First Production I Method of Operation (Flowing, gas lift, etc.) January 30, 1999 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAs-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure OALCULATED OIL-BBL GAS-MCF WATER-BBL OiL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Sag River 10869' 8786' Shublik 10903' 8812' Shublik 'B' 10949' 8845' Shublik 'C' 10991' 8871' Top of Sadlerochit 11025' 8891' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge / ~ Signed ~ ..,.-., ~--), ~ '""%'.( ¼i o~ ~, Dan Stone Title Senior Drilling Engineer Date U-0gA 84-212 Prepared By Name/Number; Terrie Hubble, 564-4628 Well Number Permit No./Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility PB U Pad Progress Report Well U-09A Page 1 Rig Nabors 9ES Date 15 January 99 Date/Time 03 Nov 98 04 Nov 98 05 Nov 98 06 Nov 98 07 Nov 98 08 Nov 98 09 Nov 98 10 Nov 98 06:00-18:00 18:00-21:00 21:00-06:00 06:00-06:30 06:30-12:00 12:00-19:00 19:00-06:00 06:00-18:00 18:00-06:00 06:00-12:00 12:00-14:00 14:00-18:00 18:00-00:00 00:00-02:00 02:00-04:00 04:00-06:00 06:00-06:30 06:30-10:30 10:30-11:00 11:00-17:00 17:00-17:30 17:30-18:00 18:00-18:30 18:30-22:00 22:00-00:00 00:00-04:30 04:30-05:00 05:00-06:00 06:00-11:00 11:00-11:30 11:30-13:30 13:30-14:00 14:00-14:30 14:30-15:30 15:30-16:30 16:30-17:30 17:30-19:00 19:00-21:00 21:00-22:30 22:30-23:30 23:30-00:00 00:00-02:00 02:00-03:00 03:00-04:30 04:30-06:00 06:00-07:00 07:00-10:00 10:00-11:00 11:00-12:30 12:30-17:00 17:00-06:00 06:00-12:00 12:00-15:30 15:30-19:00 Duration 12 hr 3 hr 9 hr 1/2 hr 5-1/2 hr 7hr llhr 12hr 12hr 6hr 2 hr 4 hr 6hr 2 hr 2hr 2 hr 1/2 hr 4hr 1/2 hr 6hr 1/2 hr 1/2 hr 1/2 hr 3-1/2 hr 2hr 4-1/2 hr 1/2 hr lhr 5hr 1/2 hr 2hr 1/2 hr 1/2 hr lhr lhr lhr 1-1/2 hr 2hr 1-1/2 hr lhr 1/2 hr 2 hr 1 hr 1-1/2 hr 1-1/2 hr lhr 3hr 1 hr 1-1/2 hr 4-1/2 hr 13hr 6hr 3-1/2 hr 3-1/2 hr Activity Rigged up Drillfloor / Derrick Rigged up Top drive Rigged up Mud pumps Rigged up Mud pumps (cont...) Rigged up Top drive Rigged up Kill manifold Tested High pressure lines Tested High pressure lines Serviced Mechanical brake Tested High pressure lines Tested Drillfloor / Derrick Rigged up Drillstring handling equipment Rigged up Top drive Serviced Block line Tested Crown block Commissioned Drillfloor / Derrick Serviced Hanger plug Serviced High pressure lines Held safety meeting Circulated at 10480.0 ft Serviced Hanger plug Tested Other sub-surface equipment - Via annulus Held safety meeting Removed Xmas tree Rigged up BOP stack Rigged up BOP stack Tested BOP stack Repaired HCR valve Repaired HCR valve (cont...) Tested BOP stack Investigated pressure change Tested Tubing hanger Rigged down Well control Removed Accessories Installed Accessories Tested Well control Retrieved Accessories Rigged up Top drive Rigged up Top drive Made up BHA no. 1 Fished at 30.0 ft Circulated at 10480.0 ft Pulled out of hole to 10450.0 ft Laid down 200.0 ft of Tubing Set Retrievable packer at 100.0 ft with 1000.0 psi Set Retrievable packer at 100.0 ft with 1000.0 psi Rigged down Seal assembly Repaired Seal assembly Installed Seal assembly Tested BOP stack Repaired Blind / Shear ram Repaired Blind / Shear ram Tested BOP stack Tested Tubing head spool Progress Report Facility PB U Pad Well U-09A Rig Nabors 9ES Page 2 Date 15 January 99 Date/Time 19:00-23:00 23:00-03:00 11 Nov 98 03:00-06:00 06:00-10:30 10:30-12:00 12:00-15:00 15:00-18:15 18:15-00:00 12 Nov 98 00:00-01:00 01:00-03:30 03:30-05:00 05:00-06:00 06:00-13:00 13:00-13:30 13:30-19:00 19:00-06:00 13 Nov 98 06:00-12:30 12:30-13:30 13:30-14:30 14:30-15:30 15:30-18:00 18:00-02:00 14 Nov 98 02:00-03:00 03:00-03:30 03:30-06:00 06:00-10:30 10:30-11:00 11:00-12:30 12:30-13:30 13:30-14:00 14:00-15:30 15:30-21:30 21:30-23:30 23:30-00:15 15 Nov 98 00:15-02:00 02:00-03:00 03:00-06:00 06:00-07:30 07:30-08:00 08:00-12:30 12:30-13:30 13:30-14:30 14:30-16:00 16:00-22:00 22:00-01:30 16 Nov 98 01:30-03:30 03:30-05:30 05:30-06:00 06:00-10:00 10:00-11:00 11:00-12:00 12:00-12:30 12:30-19:00 19:00-20:00 Duration 4hr 4hr 3 hr 4-1/2 hr 1-1/2 hr 3hr 3-1/4 hr 5-3/4 hr 1 hr 2-1/2 hr 1-1/2 hr lhr 7hr 1/2 hr 5-1/2 hr llhr 6-1/2 hr lhr 1 hr 1 hr 2-1/2 hr 8hr lhr 1/2 hr 2-1/2 hr 4-1/2 hr 1/2 hr 1-1/2 hr lhr 1/2 hr 1-1/2 hr 6hr 2 hr 3/4 hr 1-3/4 hr lhr 3hr 1-1/2 hr 1/2 hr 4-1/2 hr 1 hr lhr 1-1/2 hr 6hr 3-1/2 hr 2hr 2 hr 1/2 hr 4hr lhr lhr 1/2 hr 6-1/2 hr lhr Activity Removed Tubing head spool Installed Tubing head spool Tested BOP stack Tested BOP stack Installed Wear bushing Retrieved Retrievable packer Circulated at 10480.0 ft Laid down 2887.0 ft of Tubing Held safety meeting Laid down 1238.0 ft of Tubing Repaired Top drive blower Laid down 500.0 ft of Tubing Laid down 4140.0 ft of Tubing Held safety meeting Made up BHA no. 2 Singled in drill pipe to 6000.0 ft Singled in drill pipe to 10411.0 ft Held safety meeting Fished at 10471.0 ft Circulated at 10471.0 ft Serviced Top drive Pulled out of hole to 0.0 ft Laid down fish Held safety meeting R.I.H. to 1000.0 ft R.I.H. to 8000.0 ft Held safety meeting Serviced Service lines R.I.H. to 10476.0 ft Fished at 10506.0 ft Circulated at 10506.0 ft Pulled out of hole to 900.0 ft Laid down fish Held safety meeting Made up BHA no. 4 Serviced Top drive R.I.H. to 3000.0 ft R.I.H. to 10500.0 ft Fished at 10527.0 ft Milled Permanent packer at 10531.0 ft Circulated at 10570.0 ft Circulated closed in well at 10531.0 ft Circulated at 10531.0 ft Pulled out of hole to 1000.0 ft Pulled BHA Laid down fish Serviced Block line Made up BHA no. 5 Made up BHA no. 5 Serviced Draw works R.I.H. to 2000.0 ft Held safety meeting R.I.H. to 10500.0 ft Washed to 10711.0 ft Facility Date/Time 17 Nov 98 18 Nov 98 19 Nov 98 20 Nov 98 21 Nov 98 22 Nov 98 PB U Pad 20:00-21:00 21:00-03:00 03:00-03:30 03:30-06:00 06:00-09:00 09:00-10:00 10:00-12:30 12:30-13:00 13:00-15:00 15:00-20:00 20:00-21:00 21:00-23:00 23:00-02:00 02:00-03:00 03:00-06:00 06:00-07:00 07:00-07:30 07:30-16:30 16:30-19:00 19:00-19:30 19:30-20:00 22:00-03:00 03:00-06:00 06:00-06:30 06:30-07:00 07:00-08:00 08:00-11:30 11:30-14:00 14:00-16:00 16:00-18:00 18:00-20:30 20:30-05:30 05:30-06:00 06:00-08:30 08:30-09:00 09:00-11:00 11:00-12:30 12:30-13:00 13:00-22:00 22:00-23:30 23:30-06:00 06:00-08:00 08:00-09:00 09:00-10:00 10:00-12:00 12:00-13:00 13:00-14:00 14:00-19:30 19:30-20:30 20:30-02:00 02:00-04:00 04:00-04:30 04:30-06:00 06:00-19:30 Duration lhr 6 hr 1/2 hr 2-1/2 hr 3 hr lhr 2-1/2 hr 1/2 hr 2 hr 5hr lhr 2 hr 3hr 1 hr 3hr lhr 1/2 hr 9hr 2-1/2 hr 1/2 hr 1/2 hr 5 hr 3 hr 1/2 hr 1/2 hr lhr 3-1/2 hr 2-1/2 hr 2 hr 2hr 2-1/2 hr 9hr 1/2 hr 2-1/2 hr 1/2 hr 2 hr 1-1/2 hr 1/2 hr 9hr 1-1/2 hr 6-1/2 hr 2hr lhr lhr 2hr 1 hr 1 hr 5-1/2 hr lhr 5-1/2 hr 2hr 1/2 hr 1-1/2 hr 13-1/2 hr Progress Report Well U-09A Rig Nabors 9ES Activity Tested Casing - Via annulus and string Drilled cement to 10788.0 ft Flow check Pulled out of hole to 8500.0 ft Pulled out of hole to 2505.0 ft Serviced Top drive Pulled BHA Held safety meeting Made up BHA no. 6 R.I.H. to 10649.0 ft Washed to 10788.0 ft Circulated at 10788.0 ft Drilled cement to 10883.0 ft Backreamed to 10525.0 ft Circulated at 10883.0 ft Circulated at 10883.0 ft Tested Top drive Pulled out of hole to 1000.0 ft Pulled BHA Held safety meeting Retrieved Wear bushing Investigated pressure change Tested BOP stack Tested BOP stack Installed Wear bushing Serviced Top drive Made up BHA no. 7 Serviced Top drive pipe handler Pulled BHA Made up BHA no. 7 Rest hole at 0.0 ft R.I.H. to 10854.0 ft Circulated at 10854.0 ft Circulated at 10820.0 ft Held safety meeting Repaired Top drive Set tool face Set Permanent packer at 10883.0 ft with 0.0 psi Milled Casing at 10892.0 ft Circulated at 10892.0 ft Pulled out of hole to 1000.0 ft Pulled BHA Serviced Top drive Laid down 270.0 ft of 4-3/4in OD drill pipe Made up BHA no. 8 Held safety meeting Made up BHA no. 8 Singled in drill pipe to 2530.0 ft Serviced Top drive R.I.H. to 10750.0 ft Rest hole at 10750.0 ft R.I.H. to 10892.0 ft Drilled to 10912.0 ft Drilled to 11153.0 ft Page Date 3 15 January 99 Progress Report Facility PB U Pad Well U-09A Rig Nabors 9ES Page 4 Date 15 January 99 Date/Time 19:30-21:15 21:15-22:00 22:00-00:30 23 Nov 98 00:30-01:30 01:30-02:30 02:30-06:00 06:00-07:00 07:00-08:30 08:30-11:30 11:30-12:00 12:00-12:30 12:30-13:30 13:30-15:00 15:00-15:15 15:15-17:00 17:00-22:00 22:00-22:30 22:30-05:00 24 Nov 98 05:00-06:00 06:00-11:30 11:30-12:30 12:30-15:00 15:00-17:00 17:00-17:30 17:30-18:30 18:30-20:30 20:30-21:30 21:30-21:45 21:45-23:30 23:30-00:30 25 Nov 98 00:30-02:30 02:30-03:00 03:00-03:30 03:30-04:30 04:30-06:00 06:00-06:30 06:30-09:00 09:00-10:00 10:00-10:30 10:30-16:00 16:00-16:30 16:30-19:30 19:30-20:00 20:00-22:30 22:30-23:30 23:30-06:00 26 Nov 98 06:00-03:30 27 Nov 98 03:30-04:00 04:00-06:00 06:00-14:00 14:00-15:30 15:30-18:00 18:00-19:00 19:00-20:30 Duration 1-3/4 hr 3/4 hr 2-1/2 hr lhr lhr 3-1/2 hr lhr 1-1/2 hr 3 hr 1/2 hr 1/2 hr lhr 1-1/2 hr 1/4hr 1-3/4 hr 5hr 1/2 hr 6-1/2 hr 1 hr 5-1/2 hr 1 hr 2-1/2 hr 2hr 1/2 hr 1 hr 2hr 1 hr 1/4 hr 1-3/4 hr lhr 2hr 1/2 hr 1/2hr lhr 1-1/2 hr 1/2 hr 2-1/2 hr lhr 1/2hr 5-1/2 hr 1/2 hr 3hr 1/2 hr 2-1/2 hr lhr 6-1/2 hr 21-1/2 hr 1/2 hr 2hr 8hr 1-1/2 hr 2-1/2 hr 1 hr 1-1/2 hr Activity Circulated at 11153.0 ft Pulled out of hole to 10800.0 ft Pulled out of hole to 7000.0 ft Serviced Top drive Serviced Iron roughneck Pulled out of hole to 2500.0 ft Pulled out of hole to 646.0 ft Pulled BHA Made up BHA no. 9 Tested M.W.D. tool - Via annulus and string Held safety meeting Serviced Top drive R.I.H. to 3600.0 ft Circulated at 3600.0 ft Serviced Block line R.I.H. to 11130.0 ft Took MWD survey at 11130.0 ft Drilled to 11390.0 ft Repaired Top drive Drilled to 11630.0 ft Rest hole at 11630.0 ft Functioned Circulating sub Circulated at 11630.0 ft Rest hole at 11630.0 ft Pulled out of hole to 10763.0 ft Circulated at 10763.0 ft R.I.H. to 11630.0 ft Drilled to 11640.0 ft Rest hole at 11640.0 ft Circulated at 11640.0 ft Circulated at 11640.0 ft Pulled out of hole to 10813.0 ft Circulated at 10813.0 ft Circulated at 10813.0 ft Rest hole at 10813.0 ft R.I.H. to 11640.0 ft Drilled to 11709.0 ft Circulated at 11709.0 ft Pulled out of hole to 10790.0 ft Rest hole at 10790.0 ft R.I.H. to 11709.0 ft Circulated at 11709.0 ft Pulled out of hole to 11783.0 ft Circulated at 11783.0 ft R.I.H. to 11709.0 ft Drilled to 11855.0 ft Drilled to 12426.0 ft (cont...) Serviced Top drive Drilled to 12500.0 ft Drilled to 12891.0 ft (cont...) Circulated at 12891.0 ft Pulled out of hole to 11148.0 ft R.I.H. to 12891.0 ft Circulated at 12891.0 ft Progress Report Facility PB U Pad Well U-09A Page 5 Rig Nabors 9ES Date 15 January 99 Date/Time 28 Nov 98 29 Nov 98 30 Nov 98 01 Dec 98 02 Dec 98 20:30-00:00 00:00-00:30 00:30-06:00 06:00-08:00 08:00-11:30 11:30-18:00 18:00-19:00 19:00-19:30 19:30-20:00 20:00-20:30 20:30-21:30 21:30-22:00 22:00-22:45 22:45-00:00 00:00-00:15 00:15-01:30 01:30-06:00 06:00-08:30 08:30-10:30 10:30-11:00 11:00-13:00 13:00-14:30 14:30-19:00 19:00-22:00 22:00-01:00 01:00-03:00 03:00-04:00 04:00-05:30 06:00-07:00 07:00-12:30 12:30-14:00 14:00-15:00 15:00-15:30 15:30-16:00 16:00-20:30 20:30-21:00 21:00-21:30 21:30-22:00 22:00-05:30 05:30-06:00 06:00-08:00 08:00-12:30 12:30-14:00 14:00-16:00 16:00-23:00 23:00-00:00 00:00-00:30 00:30-01:00 01:00-04:00 04:00-04:30 04:30-06:00 06:00-08:00 08:00-08:30 08:30-09:00 Duration 3-1/2 hr 1/2 hr 5-1/2 hr 2 hr 3-1/2 hr 6-1/2 hr lhr 1/2 hr 1/2 hr 1/2 hr 1 hr 1/2 hr 3/4 hr 1-1/4 hr 1/4 hr 1-1/4 hr 4-1/2 hr 2-1/2 hr 2hr 1/2 hr 2 hr 1-1/2 hr 4-1/2 hr 3hr 3 hr 2hr lhr 1-1/2 hr 1 hr 5-1/2 hr 1-1/2 hr lhr 1/2 hr 1/2 hr 4-1/2 hr 1/2 hr 1/2 hr 1/2 hr 7-1/2 hr 1/2 hr 2hr 4-1/2 hr 1-1/2 hr 2hr 7 hr 1 hr 1/2 hr 1/2 hr 3hr 1/2 hr 1-1/2 hr 2hr 1/2 hr 1/2 hr Activity Pulled out of hole to 8500.0 ft Held safety meeting Pulled out of hole to 646.0 ft Pulled BHA Made up BHA no. 10 R.I.H. to 10753.0 ft Monitor pressures R.I.H. to 11620.0 ft Rigged up High pressure lines Mixed and pumped 20.000 bbl of treatment Displace treatment Circulated at 10620.0 ft R.I.H. to 12891.0 ft Circulated at 12891.0 ft Held safety meeting Circulated at 12891.0 ft Pulled out of hole to 6391.0 ft Pulled out of hole to 350.0 ft (cont...) Pulled BHA Held safety meeting Installed Formation logs Singled in drill pipe to 750.0 ft R.I.H. to 10783.0 ft Rigged down sub-surface equipment - Other sub-surface equipment Ran logs on tubulars Ran logs on tubulars Ran logs on tubulars Ran logs on tubulars Rigged up Logging/braided cable equipment Pulled out of hole to 123.0 ft Rigged down Wireline units Serviced Top drive Retrieved Wear bushing Installed BOP test plug assembly Tested BOP stack Retrieved BOP test plug assembly Installed Wear bushing Rigged up sub-surface equipment - Hole opener Ran Drillpipe in stands to 12891.0 ft Circulated at 12891.0 ft Circulated at 12891.0 ft (cont...) Circulated at 12891.0 ft Circulated at 12891.0 ft Pulled out of hole to 10783.0 ft Pulled out of hole to 0.0 ft Rigged up Casing handling equipment Held safety meeting Rigged up Casing handling equipment Ran Liner to 2145.0 ft (4-1/2in OD) Rigged up Tubing handling equipment Ran Tubing to 2-7/8in (500.0 ft OD) Ran Tubing to 2043.0 ft (2-7/8in OD) (cont...) Rigged up sub-surface equipment - Liner hanger Circulated at 2199.0 ft Progress Report Facility PB U Pad Well U-09A Rig Nabors 9ES Page 6 Date 15 January 99 Date/Time 09:00-17:00 17:00-18:00 18:00-18:30 18:30-20:00 20:00-00:30 03 Dec 98 00:30-01:30 01:30-02:00 02:00-02:15 02:15-02:45 02:45-03:00 03:00-06:00 06:00-10:30 10:30-12:00 12:00-22:00 22:00-03:00 04 Dec 98 03:00-04:30 04:30-05:00 05:00-06:00 06:00-08:00 08:00-09:00 09:00-10:30 10:30-11:00 11:00-11:30 11:30-15:00 15:00-15:30 15:30-16:00 16:00-18:00 18:00-23:00 23:00-06:00 05 Dec 98 06:00-13:00 13:00-13:15 13:15-14:00 14:00-15:00 15:00-15:30 15:30-16:30 16:30-17:00 17:00-17:30 17:30-00:00 06 Dec 98 00:00-01:00 01:00-01:30 01:30-02:00 02:00-03:00 03:00-06:00 06:00-06:30 06:30-07:30 07:30-08:00 08:00-12:00 12:00-13:30 13:30-14:30 14:30-15:30 15:30-16:30 16:30-23:00 23:00-00:00 07 Dec 98 00:00-00:30 Duration 8 hr lhr 1/2 hr 1-1/2 hr 4-1/2 hr 1 hr 1/2 hr 1/4 hr 1/2 hr 1/4 hr 3hr 4-1/2 hr 1-1/2 hr 10hr 5 hr 1-1/2 hr 1/2 hr 1 hr 2hr lhr 1-1/2 hr 1/2 hr 1/2 hr 3-1/2 hr 1/2 hr 1/2 hr 2 hr 5hr 7hr 7hr 1/4hr 3/4 hr 1 hr 1/2 hr lhr 1/2 hr 1/2 hr 6-1/2 hr 1 hr 1/2 hr 1/2 hr 1 hr 3 hr 1/2 hr lhr 1/2 hr 4 hr 1-1/2 hr lhr lhr lhr 6-1/2 hr 1 hr 1/2 hr Activity Ran Drillpipe to 10800.0 ft (4in OD) Circulated at 10800.0 ft Rigged up Cement head Ran Liner on landing string to 12891.0 ft Circulated at 12891.0 ft Batch mixed slurry - 57.000 bbl Pumped Water spacers - volume 20.000 bbl Mixed and pumped slurry - 57.000 bbl Displaced slurry - 117.600 bbl Functioned Liner hanger Circulated at 10714.0 ft Circulated at 10714.0 ft (cont...) Pulled Drillpipe in stands to 10905.0 ft Worked stuck pipe at 10905.0 ft Prepared & fired cutting charge at 10620.0 ft Pulled out of hole to 0.0 ft Rigged down Logging/braided cable equipment Pulled Drillpipe in stands to 9860.0 ft Pulled Drillpipe in stands to 5634.0 ft (cont...) Circulated at 5634.0 ft Pulled Drillpipe in stands to 1795.0 ft Rigged down sub-surface equipment - Setting tools Rigged up Tubing handling equipment Laid down 1795.0 ft of Tubing Held safety meeting Rigged up Drillstring handling equipment Made up BHA no. 12 R.I.H. to 10600.0 ft Fished at 10621.0 ft Fished at 10621.0 ft (cont...) Held safety meeting Rigged up Logging/braided cable equipment R.I.H. to 10867.0 ft Cut Tubing at 10867.0 ft Pulled out of hole to 0.0 ft Rigged up Logging/braided cable equipment Jarred stuck pipe at 10867.0 ft Pulled out of hole to 403.0 ft Laid down fish R.I.H. to 651.0 ft Laid down 651.0 ft of 3-1/2in OD drill pipe Made up BHA no. 13 Ran Tubing to 2-7/8in (2000.0 ft OD) Ran Tubing to 2099.0 ft (2-7/8in OD) (cont...) Made up BHA no. 13 Functioned Mud motor R.I.H. to 10500.0 ft Serviced Block line Circulated at 10500.0 ft R.I.H. to 10867.0 ft Jarred stuck pipe at 10867.0 ft Pulled out of hole to 2519.0 ft Pulled BHA Held safety meeting Progress Report Facility PB U Pad Well U-09A Rig Nabors 9ES Page 7 Date 15 January 99 Date/Time 00:30-02:00 02:00-04:00 04:00-04:30 04:30-05:30 05:30-06:00 06:00-11:00 11:00-12:00 12:00-16:00 16:00-17:00 17:00-18:00 18:00-18:30 18:30-21:30 21:30-02:00 08 Dec 98 02:00-06:00 06:00-06:15 06:15-08:00 08:00-13:30 13:30-17:00 17:00-18:30 18:30-19:30 19:30-01:00 09 Dec 98 01:00-01:45 01:45-04:00 04:00-06:00 06:00-09:30 09:30-10:00 10:00-16:00 16:00-21:00 21:00-22:00 22:00-00:30 10 Dec 98 00:30-02:30 02:30-03:30 03:30-03:45 03:45-06:00 06:00-17:30 17:30-18:30 18:30-20:00 20:00-01:00 11 Dec98 01:00-04:30 04:30-06:00 06:00-06:30 06:30-11:00 11:00-12:00 12:00-12:30 12:30-13:00 13:00-13:30 13:30-20:00 20:00-22:30 22:30-06:00 12 Dec 98 06:00-08:00 08:00-13:30 13:30-15:30 15:30-16:00 16:00-17:00 Duration 1-1/2 hr 2 hr 1/2 hr lhr 1/2 hr 5 hr lhr 4hr lhr lhr 1/2 hr 3hr 4-1/2 hr 4hr 1/4 hr 1-3/4 hr 5-1/2 hr 3-1/2 hr 1-1/2 hr lhr 5-1/2 hr 3/4 hr 2-1/4 hr 2 hr 3-1/2 hr 1/2 hr 6hr 5 hr lhr 2-1/2 hr 2 hr lhr 1/4hr 2-1/4 hr 11-1/2 hr 1 hr 1-1/2 hr 5hr 3-1/2 hr 1-1/2 hr 1/2 hr 4-1/2 hr lhr 1/2 hr 1/2 hr 1/2 hr 6-1/2 hr 2-1/2 hr 7-1/2 hr 2hr 5-1/2 hr 2hr 1/2 hr lhr Activity Pulled BHA Made up BHA no. 14 Serviced Mechanical brake Made up BHA no. 14 Serviced Mechanical brake R.I.H. to 10718.0 ft Washed to 10867.0 ft Worked toolstring at 10867.0 ft Serviced Draw works Jarred stuck pipe at 10867.0 ft Pulled out of hole to 10700.0 ft Circulated at 10700.0 ft Pulled out of hole to 900.0 ft Pulled BHA Pulled BHA Made up BHA no. 15 Repaired Top drive R.I.H. to 10597.0 ft Serviced Block line Washed to 10867.0 ft Milled Tubing at 10919.0 ft Backreamed to 10650.0 ft Circulated at 10650.0 ft Pulled out of hole to 9500.0 ft Pulled BHA Serviced Top drive Made up BHA no. 16 R.I.H. to 10600.0 ft Reverse circulated at 10600.0 ft Circulated at 10700.0 ft R.I.H. to 11281.0 ft Circulated at 11281.0 ft R.I.H. to 11305.0 ft ; Milled Other sub-surface equipment at 11310.0 ft Milled Other sub-surface equipment at 11348.0 ft Backreamed to 10700.0 ft Circulated at 10700.0 ft Pulled out of hole to 2500.0 ft Pulled BHA Made up BHA no. 17 Made up BHA no. 17 R.I.H. to 10575.0 ft Washed to 11348.0 ft Fished at 11362.0 ft Pulled out of hole to 10879.0 ft R.I.H. to 11362.0 ft Pulled out of hole to 950.0 ft Pulled BHA Tested BOP stack Made up BHA no. 18 R.I.H. to 10700.0 ft Washed to 11348.0 ft Washed over string at 11579.0 ft Pumped out of hole to 10649.0 ft Progress Report Facility PB U Pad Well U-09A Rig Nabors 9ES Page 8 Date 15 January 99 Date/Time 17:00-18:30 18:30-23:00 23:00-01:00 13 Dec 98 01:00-04:00 04:00-06:00 06:00-07:30 07:30-11:30 11:30-13:00 13:00-16:30 16:30-19:30 19:30-20:15 20:15-21:30 21:30-23:00 23:00-00:00 14 Dec 98 00:00-06:00 06:00-10:00 10:00-13:00 13:00-17:30 17:30-22:30 22:30-23:30 23:30-06:00 15 Dec 98 06:00-13:30 13:30-14:30 14:30-15:45 15:45-19:00 19:00-20:30 20:30-21:00 21:00-21:15 21:15-22:15 22:15-22:45 22:45-01:00 16 Dec 98 01:00-01:30 01:30-06:00 06:00-06:30 06:30-08:30 08:30-16:00 16:00-16:30 16:30-19:00 19:00-22:00 22:00-00:00 17 Dec 98 00:00-06:00 06:00-12:00 12:00-12:30 12:30-15:30 15:30-19:30 19:30-22:00 22:00-22:45 22:45-23:30 23:30-02:00 18 Dec 98 02:00-03:00 03:00-04:00 04:00-06:00 06:00-08:30 08:30-10:00 Duration 1-1/2 hr 4-1/2 hr 2 hr 3 hr 2hr 1-1/2 hr 4 hr 1-1/2 hr 3-1/2 hr 3hr 3/4 hr 1-1/4 hr 1-1/2 hr 1 hr 6hr 4 hr 3 hr 4-1/2 hr 5hr lhr 6-1/2 hr 7-1/2 hr lhr 1-1/4 hr 3-1/4 hr 1-1/2 hr 1/2 hr 1/4 hr 1 hr 1/2 hr 2-1/4 hr 1/2 hr 4-1/2 hr 1/2 hr 2hr 7-1/2 hr 1/2 hr 2-1/2 hr 3hr 2hr 6hr 6hr 1/2 hr 3hr 4hr 2-1/2 hr 3/4 hr 3/4 hr 2-1/2 hr 1 hr lhr 2hr 2-1/2 hr 1-1/2 hr Activity Circulated at 10649.0 ft Pulled out of hole to 1000.0 ft Pulled BHA Made up BHA no. 19 Serviced Block line Serviced Block line R.I.H. to 10600.0 ft Washed to 11579.0 ft Washed over string at 12789.0 ft Circulated at 12789.0 ft Circulated at 12789.0 ft Pulled out of hole to 10570.0 ft Circulated at 10570.0 ft Tested Casing - Via annulus Pulled out of hole to 2400.0 ft Pulled BHA R.I.H. to 2104.0 ft Laid down 2104.0 ft of 2.700 Conducted electric cable operations Held safety meeting Ran Tubing to 2300.0 ft (2-7/8in OD) Ran Drillpipe to 11098.0 ft (4in OD) Functioned Circulating sub Ran Drillpipe in stands to 12604.0 ft Conducted electric cable operations Set packer at 10482.0 ft with 0.0 psi Held safety meeting Perforated from 12128.0 ft to 12590.0 ft Reverse circulated at 12590.0 ft Flow check Pulled out of hole to 10600.0 ft Held safety meeting Laid down 3220.0 ft of 4in OD drill pipe Laid down 450.0 ft of 4in OD drill pipe Serviced Top drive Laid down 3400.0 ft of 4in OD drill pipe Held safety meeting Laid down 450.0 ft of Tubing Laid down 2320.0 ft of 4in OD drill pipe Rigged up Completion string handling equipment Ran Tubing to 1940.0 ft (4-1/2in OD) Ran Tubing to 9910.0 ft (4-1/2in OD) Held safety meeting Ran Tubing to 10725.0 ft (4-1/2in OD) Reverse circulated at 10725.0 ft Space out tubulars Ran Tubing to 10725.0 ft (4-1/2in OD) Tested Tubing hanger Set packer at 10502.0 ft with 4000.0 psi Tested Permanent packer Installed Hanger plug Rigged down BOP stack Rigged up Xmas tree Rigged down Hanger plug in OD drill pipe Facility PB U Pad Progress Report Well U-09A Rig Nabors 9ES Page Date 9 15 January 99 Date/Time 10:00-15:00 15:00-17:00 Duration 5 hr 2 hr Activity Circulated at 2000.0 ft Installed Hanger plug MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Robert Christenson.~'~~ DATE: Chairman December 19, 1998 THRU: FILE NO: Blair Wondzell, ~ P. I. Supervisor FROM: Larry Wad e,~,~,~,f~ SUBJECT: Petroleum Ir/spectc¢ .DOC BOP Test Nabors 9ES PBU U-02 PTD 98-212 December 19,1998: I traveled to BPX's U-Pad to witness a BOP test on Nabor's newest rig, 9ES. The rig is laid out like 2ES but with some significant modifications. Among them some enviromental safeguards and an iron roughneck. The test was a little slow because of new crews and and a new rig. Even though the rig is working, they are still fixing some ancilliary equiipment. SUMMARY: Witnessed a BOP test on Nabors 9ES, 4 hours, 0 failures. Attachments: ai9glsfe.xls cc; NON-CONFIDENTIAL STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Drlg Contractor: Operator: Well Name: Casing Size: 9 5/8 Test: Initial X Workover: Nabors Rig No. 9ES PTD # SSD Rep.: U-O2A Rig Rep.: Set @ 9,608 Location: Sec. Weekly Other 98-212 DATE: Rig Ph.# Gavin KJ'dd 12/19/98 C/eve Coyne Umiat 18 T. 11N R. 8E Meridian Test Pressures 300~5000 MISC. INSPECTIONS: Location Gen.: Housekeeping: X (Gen) PTD On Location X Standing Order Posted X BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Well Sign X Drl. Rig X Hazard Sec. X Quan. Test Press. P/F 300/3500 P 300/5000 P 300/5000 P 300/5000 P 3Od/SOO0 P 300/5000 P 300/5000 MUD SYSTEM: Visual Alarm Trip Tank X X Pit Level Indicators X X Flow Indicator X X Meth Gas Detector X H2S Gas Detector X X FLOOR SAFETY VALVES: Upper Kelly/IBOP Lower Kelly/IBOP Ball Type Inside BOP Test Quan Pressure P/F 1 300/5000 P 300/5000 P 300/5000 P 300/5000 P CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes Test Pressure P/F 14 300/5000 P 43 300/5000 P Functioned Functioned ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained 2 Blind Switch Covers: Master: Nitgn. Btl's: 4 @ 2100 3,000 1,500 minutes 20 sec. minutes 20 sec. x Remote: x Psig. Number of Failures: 0 ,Test Time: 4.0 Hours. Number of valves tested 2o Repair or Replacement of Failed Equipment will be made within days. Notify the Inspector and follow with Written or Faxed verification to tl~e AOGCC Commission Office at: Fax NO. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Distribution: orig-Well File c- Oper./Rig c- Database c- Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: Larry Wade F1-021L (Rev.12/94) Ai9glsfe.xls 198-212-0 Roll #1: ..... PRUDHOE BAY UNIT U-09A Start: Stop Roll #2: Start 502 029-21i4420i BPE~L0~0N (ALASKA) INC Stop MD 12891 TVD 09047 Completion Date: 12/18/98 Completed Status: 1-OIL Current: T Name Interval D 9148 4,5 SPERRY GR/EWR4/SLD r~,L NGP/DGR/EWR4-MD FINAL 10875-12892 t,~L NGP/DGR/EWR4-TVD FINAL 8804-9047 ~-L PEX-3DD/CN ,...-L PEX-BHCS L PEX-CN ~-L PEX-MCFL ~, L PEX-MCFM /L PEX-SSTVD R SRVY RPT T 8979 FINAL 10860-12870 FINAL 10860-12870 FINAL 10860-12870 FINAL 10860-12870 FINAL 10860-12870 FINAL 10860-12870 SPERRY 10792.02-12891. 1 SCHLUM PEX-BHC/HALS Sent Received T/C/D OH 5/27/99 5/27/99 OH 6/1/99 6/3/99 OH 6/1/99 6/3/99 OH 2/12/99 2/18/99 OH 2/12/99 2/18/99 T OH 2/12/99 2/18/99 OH 2/12/99 2/18/99 OH 2/12/99 2/18/99 T OH 2/12/99 2/18/99 OH 2/7/99 2/8/99 OH 2/12/99 2/18/99 Wednesday, January24, 2001 Page 1 of 1 Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_WOA U Pad, Slot U-OgA u-OgA Job No. AKMMgO011, Surveyed: 27 November, 1998 i:{ECEtVED DEC O 9 1.998 BPXA SURVEY REPORT 2 December, 1998 I Your Ref: API-500292114401 KBE- 76.20' MWD Survey Instrument Surface Coordinates: 59604~6.00 N, 632155.00 E (70° 17'59.6693" N, 148° 55'46.7458" FV) DRILLING C;ERVII--E5 ORIGINAL Survey Reft svy4001 Sperry-Sun Drilling Services Survey Report for U-OgA Your Reft API-500292114401 Job No. AKMMgO011, Surveyed: 27 November, 1998 Prudhoe Bay Unit Measured Depth (ft) Incl. Sub-Sea Depth (ft) 10792.02 38.630 152.200 8650.15 10863.01 38.830 153.200 8705.53 10880.22 39.590 150.000 8718.87 10912.12 42.840 141.120 8742.88 10941.02 46.460 133.970 8763.45 10973.76 51.600 126.810 8784.93 11007.06 54.500 120.300 8804.95 11037.23 56.290 112.100 8822.11 11070.23 61.020 104.720 8839.29 11097.72 67.160 101.420 8851.29 11126.59 70.300 100.160 8861.77 11156.95 70.960 99.600 8871.84 11190.44 71.990 97.110 8882.48 11221.51 74.270 94.420 8891.50 11249.58 76.360 91.850 8898.61 11283.30 78.590 88.800 8905.93 11313.51 80.880 87.770 8911.31 11343.95 83.140 85.720 8915.54 11375.83 86.300 84.610 8918.47 11406.81 86.460 84.780 8920.43 11436.89 86.610 83.310 8922.25 11469.62 87.470 83.410 8923.94 11500.42 88.710 85.760 8924.96 11530.43 89.110 86.190 8925.54 11564.70 89.020 86.980 8926.09 Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) 8726.35 4179.96 S 3654.23 E 5956300.95 N 635882.18 E 8781.73 4219.43 S 3674.60 E 5956261.85 N 635903.24 E 8795.07 4228,99 S 3679.77 E 5956252.38 N 635908.58 E 8819.08 4246.26 S 3691.68 E 5956235.32 N 635920.79 E ,8839.65 4261.19 S 3705,40 E 5956220.63 N 635934.77 E 8861.13 4277.14 S 3724,24 E 5956205.02 N 635953.88 E 8881.15 4291.81S 3746.41 E 5956190.74 N 635976.31E 8898.31 4302.74 S 3768.66 E 5956180.20 N 635998.75 E 8915.49 4311.59 S 3795.38 E 5956171.83 N 636025.62 E 8927.49 4317.16 S 3819.46 E 5956166.68 N 636049.79 E 8937.97 4322.19 S 3845.88 E 5956162.12 N 636076,30 E 8948.04 4327.11S 3874.10 E 5956157.70 N 636104,60 E 8958.68 4331.72 S 3905.51 E 5956153.64 N 636136,09 E 8967.70 4334.70 S 3935.09 E 5956151.18 N 636165,72 E 8974.81 4336.18 S 3962.20 E 5956150.17 N 636192.85 E 8982.13 4336.36 S 3995.11E 5956150.57 N 636225.76 E ' 8987.51 4335.47 S 4024.82 E 5956151.98 N 636255.45 E 8991.74 4333.76 S 4054.91 E 5956154.22 N 636285.50 E 8994J67 4331.08 S 4086.54 E 5956157.46 N 636317.08 E 8996.63 4328.23 S 4117.33 E 5956160.86 N 636347.81E 8998.45 4325.11S 4147.19 E 5956164.50 N 636377.61 E 9000.14 4321.33 S 4179.65 E 5956168.85 N 636410.01E 9001.16 4318.43 S 4210.30 E 5956172.29 N 636440.59 E 9001.74 4316.32 S 4240.23 E 5956174.92 N 636470.48 E 9002.29 4314.28 S 4274.43 E 5956177.56 N 636504.65 E Alaska State Plane Zone 4 PBU WOA U Pad Dogleg Rate (°/100ft) Vertical Section (ft) Comment 0,925 12,555 20,961 21,415 22.768 17.880 23,136 23.868 24.805 11.612 2,785 7.691 11.067 11.570 11.031 8.289 9.980 10.501 0.753 4.903 2.645 8.623 1.957 2.320 3198.87 3215.02 3219.17 3229.21 3241.30 3258.37 3278.89 3299.89 3325.54 3348.91 3374.66 3402.21 3432.98 3462.08 3488.89 3521.60 3551.24 3581.35 3613.08 3644.00 3674.02 3706.71 3737.49 3767.47 3801,70 Tie-on Survey Continued... 2 December, 1998 - 14:01 - 2 - DrillQuest Sperry-Sun Drilling Services Survey Report for U-OgA Your Ref: API-50029211440'1 Job No. AKMMgO011, Surveyed: 27 November, ~998 Prudhoe Bay Unit Measured Depth (ft) Incl. Sub-Sea Depth (ft) 11592.65 88,060 87.010 8926.81 11621.95 86.700 86,510 8928.15 11654.11 86.700 85.650 8930.00 11684.41 88,400 82.400 8931.29 11716.83 91.420 79.910 8931.34 11748.97 95.120 78.440 8929.51 11778.77 98,650 75.900 8925.94 11809.90 101.190 72,180 8920.57 11842.47 100,500 69.340 8914.45 11872.86 99,430 66.810 8909.19 11902.45 99.560 64.920 8904.30 11934.71 100,710 62,750 8898.63 11966.16 101.810 61.780 8892.49 11996.36 101.970 62.370 8886.26 12028.25 102.610 61.700 8879.48 12059.75 102.070 62,320 8872.74 12091.38 99.670 62.090 8866.78 12122,48 98.060 62,140 8861.99 12154.01 98,090 61,830 8857.56 12185.32 96.380 61.820 8853.61 12216.94 94,500 62.220 8850.62 12247.01 94.410 62.240 8848.28 12277.42 93,940 61,620 8846.07 12308.60 93.760 61.470 8843.97 12339.59 91.630 60.710 8842.52 Vertical Local Coordinates Global Coordinates Depth Northings EaStings Northings Eastings (ft) (ft) (ft) (ft) (ft) 9003.01 4312.81S 4302.33 E 5956179.52 N 636532.52 E 9004.35 4311.16 S 4331.56 E 5956181.69 N 636561.71E 9006.20 4308.97 S 4363.59 E 5956184.44 N 636593.69 E 9007.49 4305.81S 4393.69 E 5956188.12 N 636623.74 E ,9007.54 4300.83 S 4425.72 E 5956193.67 N 636655.67 E 9005.71 4294.81S 4457.23 E 5956200.25 N 636687.07 E 9002.14 4288.24 S 4486.07 E 5956207.32 N 636715.79 E 8996.77 4279.81S 4515.54 E 5956216.26 N 636745.12 E 8990.65 4269.27 S 4545.74 E 5956227.33 N 636775.12 E 8985.39 4258.10 S 4573.51E 5956239.00 N 636802.69 E 8980.50 4246.17 S 4600.14 E 5956251.39 N 636829.10 E 8974.83 4232.16 S 4628.64 E 5956265.89 N 636857.35 E 8968.69 4217.81S 4655.94 E 5956280.73 N 636884.40 E 8962,46 4203.97 S 4682.05 E 5956295.02 N 636910.26 E 8955.68 4189.36 S 4709.57 E 5956310.12 N 636937.52 E 8948.94 4174.92 S 4736.74 E 5956325.03 N 636964.43 E '8942.98 4160.43 S 4764.22 E 5956340.00 N 636991.65 E 8938.19 4146.06 S 4791.38 E 5956354.84 N 637018.55 E 8933176 4131.40 S 4818.94 E 5956369.99 N 637045.85 E 8929.81 4116.73 S 4846.32 E 5956385.13 N 637072.97 E 8926.82 4101.97 S 4874.11 E 5956400.39 N 637100.50 E 8924.48 4088.00 S 4900.64 E 5956414.82 N 637126.78 E 8922.27 4073.73 S 4927.40 E 5956429.56 N 637153.29 E 8920.17 4058.91S 4954.75 E 5956444.86 N 637180.37 E 8918.72 4043.94 S 4981.85 E 5956460.30 N 637207.20 E Alaska State Plane Zone 4 PBU_WOA U Pad Dogleg Rate (°/100ft) Vertical Section (ft) Comment 3.436 4.945 2.670 12.096 12.073 12.384 14.557 14.322 8.822 8.923 6.315 7.520 4.624 1.984 2.871 2.576 7.621 5.179 0.978 5.462 6.077 0.307 2.554 0.751 7.297 3829.61 3858.84 3890.93 3921.20 3953.57 3985.54 4014.90 4045.10 4076.23 4105.00 4132.73 4162.54 4191.19 4218.60 4247.49 4276.02 43O4.85 4333.36 4362.30 4391.06 4420.24 4448.08 4476.18 4504.93 4533.44 Continued... DrillOuest 2 Decembe~ 1998-14:01 -3- Sperry-Sun Drilling Services Survey Report for u-OgA Your Ref: API-500292114401 Job No. AKMMgOOI1, Surveyed: 27 November, 1998 Prudhoe Bay Unit Measured Sub-Sea Depth Incl. Azim. Depth (ft) (ft) Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) 12369.99 88.950 60,440 8842.36 8918.56 4029.01 S 5008.33 E 5956475.70 N 637233.41 E 12402.12 86.240 61.520 8843.71 8919.91 4013.44 S 5036.39 E 5956491.76 N 637261.20 E 12432.24 82.410 63.310 8846.69 8922.89 3999.56 S 5062.95 E 5956506.10 N 637287.51 E 12463.30 78.530 66.180 8851.83 8928.03 3986.49 S 5090.65 E 5956519.66 N 637314.97 E 12496.14 75.810 66.720 8859.12 ,8935.32 3973.70 S 5120.00 E 5956532.96 N 637344.09 E 12527.13 74.840 66.860 8866.97 8943.17 3961.88 S 5147.55 E 5956545.26 N 637371.43 E 12556.88 74.120 66.880 8874,93 8951.13 3950.62 S 5173.91 E 5956556.98 N 637397.59 E 12588.57 73.870 67.090 8883.67 8959.87 3938.71 S 5201.95 E 5956569.38 N 637425.41 E 12621.22 73.790 67.830 8892.76 8968.96 3926.69 S 5230.91 E 5956581,91 N 637454.16 E 12651.52 73,650 68.840 8901.26 8977.46 3915.95 S 5257,94 E 5956593.12 N 637481.00 E 12683.60 73.400 68.240 8910.36 8986.56 3904.70 S 5286.57 E 5956604.88 N 637509.42 E 12714.32 72.990 68.420 8919.24 8995.44 3893.84 S 5313.90 E 5956616.22 N 637536.56 E 12745.19 73.840 68.210 8928.05 9004.25 3882.91 S 5341.39 E 5956627.63 N 637563.85 E 12777.47 73.500 67.680 8937.13 9013.33 3871.28 S 5370.10 E 5956639.77 N 637592.35 E . 12806.43 72.890 68.080 8945.50 9021.70 3860.84 S 5395.78 E 5956650.66 N 637617.85 E 12837.51 72.740 69.170 8954.68 9030.88 3850.02 S 5423.43 E 5956661.96 N 637645.30 E 12891.00 72.740 69.170 8970.55 ' 9046.75 3831.85 S 5471.18 E 5956680.96 N 637692.72 E All data is in feet unless otherwise stated. Directionsland coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 27.700° (08-Nov-98) The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 84.020° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12891.00ft., The Bottom Hole Displacement is 6679.58ft., in the Direction of 125.006° (True). Alaska State Plane Zone 4 PBU WOA U Pad Dogleg Rate (°/'~OOft) Vertical Section (ft) Comment 8,860 9.078 14.023 15.461 8.436 3.160 2.421 1.014 2.191 3.233 1,956 1,448 2,830 1.895 2.487 3.385 0.000 4561.32 4590.86 4618.72 4647.63 4678.15 4706.78 4734.17 4763,30 4793,36 4821,36 4851.00 4879.32 4907.80 4937.56 4964.19 4992.82 5042.20 Projected Survey Continued... 2 December, 1998 - 14:01 - 4 - DrillQuest Sperry-Sun Drilling Services Survey Report for u-OgA Your Ref: API-500292114401 Job No. AKMM90011, Surveyed: 27 November, 1998 Prudhoe Bay Unit Alaska State Plane Zone 4 PBU WOA U Pad Comments Measured Depth {ft) 10792.02 12891.00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 8726.35 4179.96 S 3654.23 E 9046.75 3831.85 S 5471.18 E Comment Tie-on Survey Projected Survey 2 December, 1998 - 14:01 - 5 - DrillQuest 7'ONY KNOWLES, GOVERNOR ~ASi~A OIL ~ GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 October 16, 1998 Dan M. Stone Drilling Engineer Supervisor BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bav Unit U-09A BP Exploration (Alaska) Inc. Permit No: 98-212 Sur Loc: 168'SNL. 1852avVEL, Sec. 19. T1 iN, R13E, UM Btmhole Loc. 1099'NSL, 1438'WEL. Sec. 20. TllN. R13E. UM Dear Mr. Stone: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by laxv from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prcvention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice ma.',' be given bx.' contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Chairman ~ BY ORDER OF THE COMMISSION dlffEnclosures C¢: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental ConserYation w/o encl. STATE OF ALASKA ALASKA iL AND GAS CONSERVATION CO,~.MISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI []Service [] Development Gas []Single Zone [] Multiple Zone 2. Name of Operator 15. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE = 75.9' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028283 4. Location of well at surface :7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 168' SNL, 1852' WEL, SEC. 19, T11N, R13E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 794' NSL, 2770' WEL, SEC. 20, T11 N, R13E, UM U-09A At total depth 9. Approximate spud date Amount $200,000.00 1099' NSL, 1438' WEL, SEC. 20, T11N, R13E, UM 10/21/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028288, 1099'I No Close Approach 2560 13110' MD / 8961' TVDss 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 10870' Maximum Hole Angle 99° Maximum surface 2477 psig, At total depth (TVD) 8800' / 3357 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 6" 4-1/2" 12.6# L-80 IBT-M 2390' 10720' 8667' 13110' 8960' 282 sx Class 'G' .... 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary £iF~" Total depth: measured 11385 feet Plugs (measured) ~ ~¢ ~ true vertical 9178 feet Effective depth: measured 11319 feet Junk(measured) Fill at 11319' MD (11/t[l~0ij&8aSOOllS. Oomffiissiol~ true vertical 9129 feet Casing Length Size Cemented MD TVD Structural Conductor 110' 20" x 30" 8 cu yds Concrete 110' 110' Surface 2669' 13-3/8" 3720 cu ft Permafrost 'E' & II 2704' 2664' Intermediate 10823' 9-5/8" 2318 cu ft Class 'G', 279 cu ft PF 'C' 10858' 8778' Production Liner 781' 7" 288 cu ft Class 'G' , 1,06,05'. - 11385' 8582' - 9178' OR!G NAL. Perforation depth: measured 10870' - 10905' (Sag River) 11014'-11065', 11075'-11084', 11094'-11110', 11120'-11166', 11176'-11190'(Ivishak) true vertical subsea 8705' - 8732' (Sag River), 8815' - 8949' (five Ivishak intervals) 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Bob Kaluza, 564-5344 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed o--~_ ~. ~ ' "~ ~ c~ ~. s'~e. Title ~^""~'~"'"'~ ~-,~,-,,r Date v ~,~1 l i %.~] i.~1 i1,11 i~. ,~11 ~! Commission Use Only Permit Number I APINumber ApprovaIDate --. I Seecoverletter · 84-44~ ~ [2 _ ~-I ~. 50-029-21144-01 / O ---,/~, '-~'~" for other requirements Conditions of Approval: Samples Required []Yes [] No Mud Log Required []Yes [~]No Hydrogen Sulfide Measures [~Yes [] No Directional Survey Required []Yes []No Required Working Pressure for DOPE []2K; J~3K; []4K; [] 5K; [] 10K; [] 15K Other: Origina! Signed By by order of // Date/ Approved By David W. Johnston Commissioner the commission '1¢~-- ~"~ Form 10-401 Rev. 12-01-85 Submit In Triplicate Name: ] U-09A Well Plan Summary I Type of Well (producer or injector): I I Surface Location: 168' FNL, 1852' FEL, Sec. 19, T11N, R13E X = 632,155 Y= 5,960,416 Target Start: 794' FSL, 2770 FEL, Sec. 20, T1 iN, R13E X = 636,608 Y = 5,956,178 Z = 8,931' TVDss Intermediate 946' FSL, 2104 FEL, Sec. 20, T1 iN, R13E X = 637,271 Y = 5,956, 342 Z = 8,831' TVDss Target End: 1099' FSL, 1438' FEL, Sec. 20, T1 IN, R13E X = 637,933 Y = 5,956,507 Z = 8,961' TVDss I AFE Number: 14P 1181 Estimated Start Date: [ 10/21/98I IOperating days to complete: I I [ TVDss: I 8,961' I I Rig: I Nabors 9ES I I KBE: [75.9' I IWell Design (conventional, slim hole, etc.): Horizontal Sidetrack Objective: Sidetrack out of existing 7" liner into the Sag River formation, directionally drill 6" hole to (1) Z4 target, TD at 13,110' MD. Run, cmt and test 4 1/2" solid liner, complete with 4 ¥2", L-80 tbg, (5) GLM's and WOA tail assy. Formation Markers Formation Tops MD TVD(ss) Begin sidetrack 10,870' 8,710' Sidetrack from Whipstock out of 7" liner into Sag River formation. TShublik 10,899' 8,732' TSAD 11,012' 8,815' TZA 11,012' 8,815' HO/T 8,960' Maintain 25' standoff above the HO/T OOWC 8,993' TZ3 9,060' TD 13,110' 8,960' Casing/Tubing Program: Hole Csg/ WffFt Grade Conn Length Top Btm Size Tbg MDfrVD MD/TVD O.D. .,, 6" 4 1/2" 12.6# L-80 IBT 2,390' 10,720/8,667' 13,110'/8,960' liner Mod 4 V2" 12.6# L-80 IBT 10,620' 30'/30' 10,650'/8,610' compl. Mod Logging Program: Open Hole Logs: Drilling section: MWD/GR/Res from KOP (10,870') to horizontal to TD at 13,110'. MADD pass as per Geologist request. DPC Platform Express + Sonic will be run to TD. Sample catchers and rig site geologist on site before drill out of window. Mud Program: Mud Program: Special design I Drill from KOP to TD with Quickdriln Polymer system. I considerations The formulation of the brine phase will be 6% KCL. Density LSRV LSRV Viscosity Chlorides pH (ppg) (cps) yield point funnel 8.7 35-55,000 12-20 50-65 30,000 8.5-9.0 ,. to to to to to to 8.9 35-55,000 12-20 50-65 30,000 8.5-9.0 If difficulty sliding, treat system with 1%-2 % Lubetex by volume. Ensure good stocks of LCM on location. Directional: KOP: 1) 10,870' MD, drill out of 7 "liner via whipstock window at 154° azimuth, 40° inclination, build and turn angle to 90° inclination, 70° azimuth to Start target, hold azimuth to TD tag HO/T at heel @ 9,025' TVD, build to 8,909', drop to 9,039' TVD rkb at TD. Maximum Hole Angle: Close Approach Well: Point to point separation 99° building in the production section There are no close approach wells to this wellbore. Cement Data: Casing/Liner Lead: Tail: Sxs/Wt~ield Comments Sxs/Wt/Yield P&A of original well 132/15.8/1.15 "G" at 15.8 ppg 440' + 10 bbl 4 1/2", 12.6#, L-80 liner 282/15.7/1.19 Class "G", 50% via inner string excess OH Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. NO ANNULAR INJECTION IN THIS WELL. U-09A Class II drilling wastes will be disposed at CC-2A grind and inject facility. If Class I wastes are generated, they will be taken to Pad 3 disposal site. Bottom hole pressure is 3,357 psi at 8,800' TVDss (estimated) Maximum shut-in casing pressure is 2,477 psi (assumes 0.1 psi/ft gas gradient to surface). Drilling Discussion Well Objective Well U-09A targets the region SW of the H-31 that remains unswept by injectors U-09 and H-10, leaving remaining waterflood and MI reserves located within the southeastern most U Pad area. The well will be the southeastern most production well in the U-10ai pattern. The bulk of the remaining reserves are held within the upper Ivishak Zone 4B across the target polygon. The target and wellbore are positioned to provide maximum access to these reserves by undulating the wellbore across layers and cross-cut the stratigraphy of each layer twice (layers 46 and 44, and layers 45 and 43) along the length of the well. The average first year incremental oil rate is 1753 bopd at 46% WCUT and 760 scf/stb GOR. Drilling Objective The drilling objective is to pull the existing 4 V2" tubing and production packer, set a whipstock and mill through 7' liner casing into the Sag River formation, directionally drill this sidetrack to a single 1,785' horizontal target in Zone 4 above HO/T. Run 4 lA" liner and complete with 4 V2" tubing. The target is structurally low risk. No large faults are predicted but small faults can occur with the potential for fluid loss. Fluid losses could also occur due to expected low reservoir pressure. The well will be completed as a Zone 4 producer with a 4 ¥2", L-80, 12.6# tubing, (5) GLM's and WOA tailpipe assy. The GLM's will be run with depths determined after log evaluation. DRILLING HAZARDS AND CONTINGENCIES Always have two levels of tested isolation before NUfND. SURFACE CLOSE APPROACH WELL SHUT-INS There is one adjacent well that will need to be shut-in during the rig move on and off of the well.. Well spacing of the adjacent well to the South (U-10) is 35' and will therefore, need to be shut-in for rig moves. Careful coordination with any ongoing pad or facility operations or activities will be initiated prior to commencing the rig move. DRILLING CLOSE APPROACH WELL SHUT-INS No shut-ins identified on Sperry Sun directional well plans due to close approach requirements. PORE PRESSURE: The pore pressure in the Sag River (KOP) is expected to be near 7.6 ppg EMW and the Sadlerochit is expected to be near 7.5 ppg. 8.7 - 8.8 ppg mud will be used drilling the Sag River, Shublik and Sadlerochit formations and will provide sufficient overbalance to the reservoir pressure. The mud weight will be lowered if fluid losses occur in Zone lB but kept high enough to sufficiently provide overbalance for the upper Sadlerochit zones. HOLE PROBLEMS Several small, predominately down-to-the-southwest faults with throws of 20-35 feet are expected in the sidetrack. These small faults are not laterally extensive: fault lengths are 300-500 feet. There is a possibility for fluid loss due to the small faults. The original wellbore, U-09, did not experience lost circulation. Other wells in the intermediate vicinity have experienced minor lost circulation. No major faults have been identified and no major hole problems are expected. Casing Shoe Kick Tolerance The smallest kick tolerance for the casing shoe is calculated as infinite of influx assuming a swabbed gas influx at the Sag River formation along the planned directional path. Based on 8.7 ppg MW (TSAG 10,869' MD & 8,709' TVD 7.8 ppg reservoir pore pressure), and min. frac at shoe of 12.0 ppg. Pre-Rig Operations: 1. RU slickline and drift 4 ½" tbg. If cannot get to production packer, notify Operations Drilling Engineer. 2. P & A open perforations (open perfs 10,870 - 11,190'). Cement top MUST NOT be above 10,700' MD .(minimum per AOGCC = 10, 770' MD or 100' above uppermost squeezed perforation). Tag and test cement plugback. 3. Pressure test 9 5/8" to 3,000 psi. Contact AOGCC representative to witness test. Report results to ODE in Anchorage. 4. RU electric line and make a chemical cut tubing in the first full joint above production packer +10,480 MD. Circulate well to seawater through the cut. Freeze protect to + 2,200' MD. Note: use double anchor cutter, the 4 ½" tbg. is plastic coated. 5. Pressure test the 9 5/8" packoff. Carefully cycle LDS. 6. Set a BPV in preparation of the rig sidetrack. Rig Sidetrack Procedure 1. MIRU. ND tree, NU and test BOPE. Circulate well clean. 2. Pull the 4 ½" tubing completion. Tubing cut at + 10,480' MD. 3. Replace the leaking 9 5/8" packoff if necessary. 4. RIH w/4 ½" Overshot, retrieve SBR assy.. RIH retrieve K-anchor. 5. RIH w/EZSV/CCL. Set EZSV at + 10,880'.' 6. Set 9 5/8"whipstock on EZSV and mill window. 7. Kick-off and directionally drill 6" hole to 13,110' TD. 8. Run DPC log suite at TD. 9. Run and cement 4 ½", L-80 solid production liner. 10. Perforate DPC 11. Run 4 Va", L-80 tubing completion. 12. ND BOPE, NU and test tree. RDMO. TREE: CAMERON WELLHEAD: 4" MCEVOY ACTUATOR: OTIS U-09i 13-3/8", 72 #Iff, L-80, BTRS 2703 CMT'd KOP: 1800 MAX ANGLE: 45° 4-1/2", 12.6#/ft, L-80, IPC TUBING ID: 3.958" CAPACITY: .0152 BBL/FT TOP OF 7" LINER I 10604 9-5/8", 47#/ft, L-80, BTRS 10857 PERFORATION SUMMARY REF: BHCS 8/10/84 TIE IN: CBL 8/14/84 SIZE SPF INTERVAL OPEN/SQZ'D 3-3/8 6 10870-10905 OPEN 3-1/8 4 11014-11065 OPEN 3-1/8 4 11075-11084 OPEN , 3-1/8 4 11094-11110 OPEN 3-1/8 4 11120-11166 OPEN 3-1/8 4 11176-11190 OPEN PBTD I 11340 7", 26#/ft, L-80, IJ4S I 11385 I DATE REV. BY COMMENTS 8/14/84 R. Lemoine INITIAL COMPLETION 1/31/90 PRH PUT ON MAC 8/21/91 REVISED KB. ELEV = 84.18 BF. ELEV = 47.38 SSSV LANDING NIPPLE ( OTIS)(3.813" ID) NO SSSV 2012 SLIDING SLEEVE OTIS-XA (3.813" MIN. ID) BROWN SBR 9-5/8" PACKER (BOT-3H)(3.813"ID) 4-1/2" "X" NIPPLE (OTIS) (3.813" ID) 4-1/2" "XN" NIPPLE (OTIS) (3.725" ID) 4-1/2" TBG TAIL (BOT SOS) (ELMD) I 10456 10516 10540 10580 10612 10643 10642 MARKER JOINT 11055 ANGLE X PERFS: 40° PRUDHOE BAY UNIT WELL: U-9i (24-20-11-13) APl NO: 50-029-21144 SEC 19; T11N; R13E BP Exploration (Alaska) TREE: Camerron U -09a .. ~,~v__ ~.~, WELLHEAD: 4" McEVOY BF. ELEV=49.08' ACTUATOR: OTIS ...... 'X' NIPPLE 12ooo' I ~°° - ~ I o'-O--'-I L-80, BIRS , 4 12.8#/ft, L-80, 1/2" 41/2" "x" N~PPLE 110,660' I I -(OT,S) (3.813" ~D) ~ [~ O 5/8" BOT PACKERIlO,S?o' I I I 4 1/2" "X" NIPPLEI o, oo' I TOP OF I I (OTIS) (3.813" ID) 7" LINER, 10604', HI i I 4 1/2" "XN" NIPPLE ilo,71o, i (OTIS ) (3.725" ~D) .~._ 4 1/2" TBG TAIL I 10720' ,-.o,.~.s 11°8s7' I~/~ ~ <w,~, I Liner top 10720 MD Kickoff with .......... ::::::::::::::::::::::::::::::: :..:.: ..................................... ::. ....................................... .:..: PERFORATION SUMMARY ::::::::::::::::::::::::::: .................... All open perfs P & A'd .................................... .:..... :::.::. .................. :::::::::::::::::::::::: .... :.:.: .......................... :.:.::::::..: ........... _ .... '. 7", 29#/~, L-80, BTRS DATE R -'¥. BY COMMENTS PRUDHO£ BAY UNIT 8/24/98 BWS Proposed Completion W£LL:U-00a {24-20-11-13} APl NO: $0-020-21144-01 10/07/98 RMK SEC 19; TN 11N; RGE 13E BP Exploration (Alaska) SHARED SERVICES DRILLING ,4nadr'i 2 J S£h ]u¢ber'ger' U-O9A (P2A) PLAN VIEN i DECL fNAT ION.' +0.000 [E) I SCALE · f inch = 300 feet 1 BRANNo ' 26 Aug 1998 llil __. iiii , i _. I - ) ........... Harken Ident~ftc~Eion ND N/S E/~ A) ~IE-IN SURVEY t0794 4~78 S 3653 E B) TOP OF WHIPSTOCK 10870 4220 S 3675 E C) BOTTOM OF WHI~TOCK ~0885 4229 S 3679 E } ....... D) XOP/CURVE ~8/I00 10920 4250 S 36~ E E) END ~8/iO0 CURVE i1380 4371 S ~039 E F) CURVE ~2/I00 ii723 43i4 S 4377 E G) TARGET ~i 11724 43i4 S 4378 E 380) ...... ~END 12/i00 C~RVE i~784 4302 S 4436 E / I~ ~VE ~2/100 i2338 4~79 S ~959 E 4~62 S 5043 E K) TAR~E~2 i24~4 4~62 S 5043 E ~~ J) cu~ ~2/Ioo L) END 12/i~C~VE i25~0 4~4t S 5i36 E ) ~ H) TARGET ~3 ~ i3~0 40i8 S 5709 E ..... ......... .,_~ ,r, /M ~,~,L.'~,' ~L F~ ~S!B L~T~/ ............. 3~0 3750 ~:3900 ~050 4200 4358 4500 4650 4800 ~950 5 ~00 5250 5400 5550 5700 5650 6000 6'~50 6300 EAS~ -> CLOSURE ' 6977 feet at Azimuth 125.0§ SHARED SERVICES DRILLING xfnadrj 1] $ch]umberger Harker ~denLifica[ion ND BX8 SECTN A) fIE-IN SURVEY 10794 8729 ~633 B] TOP OF H'HIPSTOCK 10870 87Ek9 2645 C) 80710H OF HHIPSTOCK 10885 8800 2647 O) KOP/CURVE 18/100 10920 8826 <"55t E] END 18/100 CURVE i1380 9025 F] CUR~ ~2/100 11723 9009 3308 6] TARC-EF ~1 11724 9009 3309 H] END iR/lO0 CURVE 11784 9003 3369 [] CURVE 12/100 12338 89t5 '39~6 J] EURVE 12/100 124~4 8909 KI IARGEI ¢2 12414 8909 39c]1 L1 ENB 12/~00 CURVE 125i0 89~9 4087 BI IARGE~ ¢3 ~3110 §039 4674 ~1 70 13110 9039 4674 INCLN 3[3.85 38 85 4O 83 92 71 92 71 92 7~ ~9 It 99 t! ':JO OD 90.00 78.42 78.4~ 7~.42 u-OgA (PRA) VERTICAL SECTION V]:EW Section at: 77,15 TVD Scale,: 1 inch = 300 feet Oep Scale.: I inch = ~00 feet Ora~n ..... : 25 Aug ~ggB AN,ADP. iLL A K,--,-,..FC 96OO ~ ..... ~ - " ~ F'EA_S Bi L! I Y P]~_A~,, : I N( )T/' PPR "'" '"'-'-~ ~ PLA N ~ ) ......... ...................... '.~ .... ... H ~~ -~[,r - ~? ...................... ~C .... _~~ ...... ~ .......... ..... , ............... ,,, ............ " ~ 2JO0 2~0 2400 2550 2700 2850 3000 31~ 3300 3450 3600 3750 3go0 4050 4200 4350 4500 4550 4800 Section Departure z 3> :sD ill Anadr£11 Schlumbergar Alaska District 394G Arctic Blvd Anchorase, AK 99503 (907] 273-1700 Fax 273-8557 WELL PLaiN for SHAR~,D SERVICES DRILLING Yell ......... : U-09A <P2A} ~ield ........ : Prud_hoe Bay Co~puSaC£o~..: Minimum Curvature Units ........ : FEET Surface Lat..: 7D.29990814 N Surface b389.: 148.92965162 W Le<3al ~escripCion Surface ...... : $112 FSL 1853 FEL S19 Tie-in suryey: 933 FSL 3~95 FEL $20 Target 1 ..... : 394 FSL 2771 FEL 920 TllN R~3E Target 2 ..... : 946 FSL 2104 FEL S20 TklN R~3E BKL .......... : L099 FSL 1~39 FEL S20 LOCkT[ON9 - ALASKA Zone: 4 X-Coord Y-Ooord 632~55.00 5960416.00 63~880.78 5956303.29 636608.00 59~6178.00 637272.00 59563~1.5~ 637932,94 5956506,97 PROPOSED ~'~ELL PROFILE STATIOl{ MEASU/~ED ~NCLN DIRECTION IDE~VEIFICATIO~ DEPTH A~GLE AZIFUJT/{ TIE-IN SURVEY 10794.30 38,65 152.16 10800.00 38,67 L5~,25 ~0850.0U 38,80 [52.98 SAG RI~R 10865.75 38.84 153,25 l~P 0F ~rPS~CK 10870.00 38.85 ~53.27 VERTICAL-DEPTHS SECTION TVD StTB-SEA DEPART 6?29.42 8650.94 2632.90 8733.87 8655.39 2633.82 ~?72.87 8694.39 26(1,67 ~787.48 8709.00 8788.46 8709.98 2644,71 Prepared ..... : ~6 /u~g 1998 Vert sect az.: 77.15 ~B elevation.: 78.46 ft Magnetic Dcln: +0.0~0 (E) Scale ~actor.: 0-99991984 Conve~ence..: +1.0077~424 i ' PLAN ,J NOT APPROVED FOR -qUTION C00RDINATES-FRO[< ALASKA Zone 4 TOOL ~ELLHEAD X Y FACE ~00 4~77.~3 S 36~3.~ ~ 6358g0.78 595~3~3.29 ~SR <TIE 418I~g8 S 3654.83 E 635882.50 59563~0,17 75R 0.95 4208.85 S 3669.92 E 635897.38 5956272,66 74R 0.95 4219.33 S 3674.54 S 635902.87 5956262.27 74R 0.95 4220.04 S 3674.89 E 635903.~4 595626.1.57 44R 0.95 DOT'rOM OF ~HI~STOCK KO~/CLm'~ Z8/~OO LO885.00 4~,83 L56.14 8799.97 8721.~9 2646.78 L0898.,85' ~,83 156.14 68[0.48 8732.~0 26~8,51 10920.00 4~,83 156.14 8896.46 8747.98 2655.1~ 10950.00 ~2,28 ~48.~9 $8~8.92 8770~~4 2656,29 11000.00 ~5,79 L36,36 6884.92 8806.~ 2670,93 42~8.72 S 3678.99 E 635907.49 5956252.96 ~$ ZB.gO 4237.02 S 3682.66 E 635911-31 5956244.73 ~S 0.0fl 4249.65 S 3688.25 E 635917.L1 5956232.20 4267.22 S 3697.52 E 635926.70 5956214,80 71L 4294.55 S 3718.78 E 635948.~3 5956]87,85 63L 18.00 '['0~" SADLEROC/[IT ],L0/2.39 46,8b 133.64 8893,48 88L5.00 2675.70 ~300.,'J8 S 3'/2b.]'l E 635954.87 5956181,63 ]> Z (A~ach'Lll <c)98 U09AP2A 3.2C 9:19 AM P} FO U-O~A (P2A) STAT-IOW ]-DENT/FI CAT[ON MEASURED DEPTH ~GLE 11050.00 50.40 11100.00 55.81 11150.00 61.79 11200.00 68,18 11250.00 74.63 CURVE ll3DD.O0 81.66 11350.00 88.57 11379 . 85 92.71 11723.34 92.71 11723.35 92.71 TARGET ~ 1 ' ]]~D 12/1D0 CURVE ClfRVE 12/100 11723.85 92.76 11750.00 95.53 11983.91 99.11 [2338.0~ 99.11 12338.05 CURVE 12/100 TARDET ~2 12350.00 12~00.00 12413,96 12413,96 12450,00 12500 ,00 E~ 12/100 CURVE 12510,4~ TAR/~ET ~3 13109.73 TI) ~3109 ,73 HOT 97.68 91.68 90.00 85 68 79 68 78 42 78,~2 78,42 PROPOSED ~'ELL PROFILE ' DIRJ~CTION VERTICAL-OEPTI-{S AZf~TH TVD S13R-SEA 125.95 8918.36 8839.88 116.94 8948.~1 8869.93 109.07 89?4.33 8895,85 102.07 8995.48 8917.00 95.67 9011-35 8932.87 SECTION DEPART 2692.85 2721.48 2756.I5 2795-98 2840.00 B9.68 9021.54 8943.06 2887.12 B5.89 9025.80 8947.32 2936.19 80.46 9025.47 8946.99 2965.91 BS.46 9009.26 8930.78 3308.45 80.46 9009,26 8930.78 3398,45 80.43 9009.23 S930.75 78,95 9007.35 8928.87 77.00 9003.03 8924.55 77.00 8915.28- 8836.80 77.00 ~915.28 8836.80 3308.96 3335,0~ 3368,64 3918,77 3915.78 77,00 8913.54 8835.06 3927-60 77.00 8909.46 6830.98 3977.41 77,00 8909.26 8830,78 3991.37 77.00 8909.26 8830,78 3991.37 77.~6 8910.62 8832,14 4027.38 77.15 8916.99 8838.51 4076-95 77.17 8918.98 8840,B0 4087.21 77-17 9039.26 8960,78 ~674.29 77-17 9039-26 8960.78 4674.29 9038.~8 8960,00 26 Aug 1998 Page COORDINATES-FR0{{ ALASKA Zone 4 TOOL DL/ MELL~D X Y FACE 100 q318,88 S 3746.80 R 6]5976.87 5956164.02 561, 18.00 4339.60 S 3780.90 E 636011.32 5956143.91 501 ~8.00 4356.20 S 3820.23 E 636050.9~ 5956128,00 461 18.~0 4368.27 S 3863.84 E 636094.75 5956116,70 %3L 18-00 4375-53 S 3910.64 E 636141.67 5956110.27 %fL 18.00 4377.77 S 3959.49 ~ 636190.54 5956108.88 401 18.00 4374.97 S 4009.18 g 636240.17 5956~2.56 401 18.00 4370.90 S 4038.?4 ~ 636269.66 5956117.[4 ~ 18.00 4314.~2 S 4377.09 g 636606.93 5956179.97 HS 0.00 43~4.~2 S 4377.[0 ~ 636606.]4 5956179.97 281 0.00 4313.9~ S 4377.60 E 636607.43 S956180.06 4309.26 S 4403.25 g 636633.8~ 5956185.18 4302-26 S 4436.15 E 636665.76 5956192.76 4179-19 S 4969.26 E 637[96.58 5956325.17 4179.19 S' 4969.27 E 637L96.60 5956325.17 281 12.00 281 12.00 HS 12.00 LS 0.00 LS 12 . 0O 4176,53 S 4980.79 ~ 637208.07 5956328.03 LS 12.00 4~65,33 S 5029.32 E 637256.39 5956340.09 LS 12.00 4162,19 S 5042.92 ~ 637269,94 5956343.47 I79~ 12.00 4162.19 S 5042.92 E 637269.9~ 5956343.47 179R 12.00 4154.11 S 5078.01 E 637304.87 5956352-16 179R 12.00 4143.05 S 5126.33 E 637352,99 5956364.07 ~140.76 S 5136.34 E 637362.96 5956366.53 HS 12-00 4010.36 $ 5708.75 E 639932,94 5956506.97 O-gO 4010.36 S 5708.75 E 657932.94 E956506.97 0.aa .O Z I> 0OWC TZ3 ;tnach~£tl (c]98 U09AP2A 3,2C 9:19 AM PI 907t.48 8993.00 9138.48 9060.00 AN,'~.': D',x ~ L L AKA-DP C F'EAS[ I LITY PLAN NOT A ROVED FOR >( CUTION !' 7LAN Alaska hared ervices rilling WELL NAME U-09A COVER SHEET IThe attached work cannot commence without obtaining the required signatures in I the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. I "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: (only one category per cover sheet) DRILLING PERMIT Permit ~0cum~t~i~Prepared: ODE: /<_~-../z~,~%h.~_ Date:/°//~ Pe~t Application R~iewed: SDE~S:~ ~~ Date:l~j~h Pemtpli tion Su~tted' ~ · T~~~~ Date~[~ PRE-RIG WORK Pre-Rig Memo Reviewed: SDE/ES: Date: Pre-Rig Memo Sent to Slope: ODE: Date: Pre-Rig Sundry Documentation Prepared: ODE: Date: Pre-Rig Sundry Application Reviewed: SDEfES: Date: Pre-Rig Sundry Application Submitted: TA: Date: I[~ SUNDRY NOTICE ['~ Sundry Documentation Prepared: ODE: Date: r-I Sundry Application Reviewed: SDE/ES: Date: '--]Sundry Application Submitted: TA: Date: NOTE: IF SUNDRY IS FOR PRE-RIG WORK~ USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW Reason for Sundry (Check all that apply) Abandon Change Approved Program Alter Casing Operation Shutdown Suspend Re-enter Suspended Well Repair Well Time Extension Plugging Perforate Pull Tubing Stimulate Variance EIVED Other(Explain): 0c~T APPROVAL TO PROCEED Cons. ~mrniRsinn ~crmrage Approved AOGCC Permit/Sundry Received TA: Date: Approval to Commence Operations SDE/ES: Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATIC :~COMMISSION APPLICATION FOR SUNDRY ,~PPROVAL Type of Request: i;~:} Abandon l li Suspend ~ Plugging '~' Time Extension : ~ Perforate '.. Alter Casing j Repair Well ! ~ Pull Tubing ~-~'. Variance ~ Other · _i Change Approved Program i. ] Operation Shutdown {~ Re-Enter Suspended Well ~ Stimulate Plug Back for Sidetrack Name of Operator 15 Type of well: I 6. Datum Elevation (DF or BP Exploration (Alaska)Inc. i [] Development l KBE = 84.18' AMSL ~_~F~. Exploratory I 7. Unit or Property Name Address ~ Stratigraphic ~, Prudhoe Bay Unit P.O. Box 196612, Anchorage, Alaska 99519-6612 I !~ Service 8. Well Number Location of well at surface 168' SNL, 1852' WEL, SEC. 19, T11N, R13E, UM At top of productive interval N/A - Water Injection Well At effective depth 631' NSL, 1964' EWL, SEC. 20, T11N, R13E, UM At total depth 596' NSL,-1983' EWL, SEC. 20, T11N, R13E, UM U-09i 9. Permit Number 84-112 10. APl Number 50-029-21144 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool !2. Present well condition summary Total depth: measured 11385 feet true vertical 9178 feet Effective depth: measured 11319 feet true vertical 9129 feet Casing Length Size Structural Conductor 110' Surface 2669' Intermediate 10823' Production Liner 781 ' Perforation depth: measured true vertical Plugs (measured) Junk (measured) Fill at 11319' MD (11/88) Cemented MD ........ TVD 20" x 30" 8 cu yds Concrete 110' 110' 13-3/8" 3720 cu ft Permafrost 'E' & II 2704' 2664' 9-5/8" 2318 cu ft Class 'G', 279 cu ft PF 'C' 10858' 8778' 7" 288 cu ft Class 'G' 10605'-11385' 8582'-9178' BUPL/CA'I"E 10870' - 10905' (Sag River) 11014' - 11065', 11075' - 11084', 11094' - 11110', 11120' - 11166', 11176' - 11190' (Ivishak) subsea 8705' - 8732' (Sag River), 8815' - 8949' (five Ivishak intervals) Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 10540' with 4-1/2" tailpipe to 10644' Packers and SSSV (type and measured depth) 9-5/8" BOT packer at 10540'; 4-1/2" BVN at 2012' 13. Attachments ~ Description summary of proposal [] Detailed operations program ~ BOP sketch 14. Estimated date for commencing operation October 14, 1998 16. If proposal was verbally approved Name of approver Date approved Contact Engineer Name/Number: Bob Kaluza, 564-5344 15. Status of well classifications as: ~ Oil ~ Gas ~ Suspended Service Water Injection Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~------"~._., ..-t-,~. ~ ~ pan ~. s'~b~E. Title Senior Drillinq Engineer Commission Use Only Date Conditions of Approval: Notify Commission so representative may witness Plug integrity ___ BOP Test __ Location clearance Mechanical Integrity Test ____ Subsequent form required 10- l Approval No.~,~fi~--~ "~1! Commissioner Date -- Submit In Triplicate DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET <,.~,~,TU CtlOgibYUk¢ .tO,..,. O0 1.00. O0 H~NDLiNg INST' S/H -FERRI HUBBLE X46~8 COMPANY · WELL PERMIT CHECKLIST :IELD & POOL __.~_ _~___...~_ J..~- C3 INIT CLASS ~ ~ t_.l WELL NAME ~) ~ LJ~ ~,~L- 0 ~1' ~ PROGRAM: exp [] dev,[~'redrll (~ serv I-I wellbore seg II ann. disposal para req [! ~_L.,- GEOL AREA ~ ? ~ UNIT# Il (..o ~"-E3 ON/OFF SHORE O/-"7 ......... ADMINISTRATION A~ DATE _ 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well Iocaled in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is we,bore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING ,GEOLOGY 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMl' vol adequate to circulate on conductor & surf csg ..... 17. CMl- vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B 8, permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do Ihey meet regulation ....... · ........ 26. BOPE press rating appropriate; test to :~~ ps~g. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. 30. Permit can be issued w/o hydrogen sulfide ~ .... 31. Data presented on potential ove~nes ...... 32. Seismic analysis of shallo~nes ..... '. ....... 33. Seabed condi~ (if off-shore) ............. 34. C~Iy progress reports ....... exploratory only] A[~ DA'rE ANNULAR DISPOSAL 35. APPR DATE N (~N Y N Y N Y N Y N Y N Y N Y N Y N With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ....... Y N (B) will not contaminale freshwater; or cause drilling waste... Y N to s~rface; (C) wii~ ni3t"impair..Q~echanical integrity of the well used for disposal; Y N (D) will not damage Producing formation or impair recovery from a Y N pool; and (E) will not cirC,umv,e, nt 20 .A..AC 25',252 or.20 .AAC 25.412. Y N GEOLOGY: ENGINEERING: UIC/Annu, lar '" coMulS~i°N: RPC_.~___ WM DWJ ~ ~ .J ..c CO BEW JDH ~ Comments/instructions: M.cheklisl ~ev 05129198 Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER . ............................ * ....... SCHLUMBERGER ....... * ' ~ ' * ............................ ~ ............................. ~k~ Oil & Gas ~s. ~~ ~or~e COMPANY NAME : BP EXPLORATION WELL NAME : U-O9A FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292114401 REFERENCE NO : 99037 LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: **** REEL HEADER **** SERVICE NAME : EDIT mATE ' 99/02/ 8 ORIGIN : FLIC REEL NAME : 99037 CONTINUATION # : PREVIOUS REEL : CONk4ENT · BP EXPLORATION, U-O9A, PRUDHOE BAY, API #50-029-21144-01 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 99/02/ 8 ORIGIN : FLIC TAPE NAME : 99037 CONTINUATION # : 1 PREVIOUS TAPE : CONk4ENT · BP EXPLORATION, U-O9A, PRUDHOE BAY, API #50-029-21144-01 TAPE HEADER PRUDHOE BAY OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL : FSL : FEL: FWL : ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING U-O9A 500292114401 BP EXPLORATION SCHLUMBERGER WELL SERVICES 8-FEB-99 RUN 1 99037 B . BOEHI4E CRAIG/HAYWO0 RUN 2 RUN 3 19 llN 13E 168 1852 76.20 76.20 47.38 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6. 000 7. 000 10863 . 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-FEB-i'bJ~ 11:15 3RD STRING PRODUCTION STRING REMARKS: CONTAINED HEREIN IS THE PEX/BHC/HALS DATA ACQUIRED ON BP EXPLORATION WELL U-O9A ON 29-NOV-98. NO DEPTH SHIFTS HAVE BEEN APPLIED TO THIS DATA AS IT IS THE PRIMARY DEPTH CONTROL DATA. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NYJMBER: 1 EDITED OPEN HOLE MAIN PASS All tool strings; Depth shifted and clipped curves; all runs merged; no cased hole data. DEPTH INCREMENT: 0.5000 FILE SUN~ZlARY LDWG TOOL CODE CNT SDN BCS DLL $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 12849.0 10863.0 12862.0 10863.0 12820.0 10863.0 12874.0 10876.0 BASELINE DEPTH $ MERGED DATA SOURCE LDWG TOOL CODE REMARKS: THIS FILE CONTAINS THE CLIPPED, OPEN HOLE MAIN PASS CNT/SDN/BCS/DLL DATA PRESENTED AT .5' SAMPLE RATE. NO DEPTH SHIFTS HAVE BEEN APPLIED TO THiS DATA AS IT IS THE PRIMARY DEPTH CONTROL DATA. $ .......... EQUIVALENT UNSHIFTED DEPTH .......... CNT SDN BCS DLL RUN NO. PASS NO. MERGE TOP MERGE BASE LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-FEB-i~' 11:15 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 104 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 9 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000 SP DLL MV O0 000 O0 0 1 1 1 4 68 0000000000 GR DLL GAPI O0 000 O0 0 1 1 1 4 68 0000000000 TENS DLL LB O0 000 O0 0 1 1 1 4 68 0000000000 TEND DLL LB O0 000 O0 0 1 1 1 4 68 0000000000 MRES DLL OH~ O0 000 O0 0 1 1 1 4 68 0000000000 MTEMDLL DEGF O0 000 O0 0 1 1 1 4 68 0000000000 DEV DLL DEG O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNT CPS O0 000 O0 0 ! 1 1 4 68 0000000000 CFTC CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNT CPS O0 000 O0 0 i 1 1 4 68 0000000000 CRAT CNT O0 000 O0 0 1 1 i 4 68 0000000000 NRAT CNT O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNT PU-S O0 000 O0 0 1 1 1 4 68 0000000000 CPHI CNT PU-S O0 000 O0 0 1 1 1 4 68 0000000000 DT BCS US/F O0 000 O0 0 1 1 1 4 68 0000000000 CALl SDN IN O0 000 O0 0 1 ! 1 4 68 0000000000 DRHO SDN G/C3 O0 000 O0 0 1 t 1 4 68 0000000000 PEF SDN BN/E O0 000 O0 0 1 1 1 4 68 0000000000 RHOB SDN G/C3 O0 000 O0 0 1 1 1 4 68 0000000000 MSFL SDN OH~M O0 000 O0 0 1 1 1 4 68 0000000000 MINV SDN 0t~4~ O0 000 O0 0 1 1 1 4 68 0000000000 ~!NOR SDN O~ O0 000 O0 0 1 i 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) LLD DLL OH~4 O0 000 O0 0 1 1 1 4 68 0000000000 LLS DLL OHF~I O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA DEPT. 12884.000 SP.DLL -999.250 GR.DLL -999.250 TENS.DLL TEND.DLL 546.979 ~4~ES.DLL -999.250 MTE~I. DLL -999.250 DEV. DLL CNTC. CNT -999.250 CFTC. CNT -999.250 FCNT. CNT -999.250 NCNT. CNT CRAT. CNT -999.250 NRAT. CNT -999.250 NPHI. CNT -999.250 CPHI.CNT DT.BCS -999.250 CAL1.SDN -999.250 DRHO. SDN -999.250 PEF. SDN RHOB.SDN -999.250 MSFL.SDN -999.250 MINV. SDN -999.250 IziNOR.SDN LLD.DLL -999.250 LLS.DLL -999.250 DEPT. 10863.000 SP.DLL 53.750 GR.DLL 104.234 TENS.DLL TEND.DLL 1132.392 MRES.DLL 0.078 MTEM. DLL 143.619 DEV. DLL CNTC. CNT 1922.715 CFTC. CNT 779.929 FCNT. CNT 716.906 NCNT. CNT CRAT. CNT 2.637 NRAT. CNT 2.820 NPHI. CNT 30.540 CPHI.CNT DT.BCS 60.527 CAL1.SDN 6.456 DRHO.SDN 0.570 PEF. SDN RHOB.SDN 3.789 MSFL.SDN 0.258 MINV. SDN 0.298 I~NOR.SDN LLD.DLL -999.250 LLS.DLL -999.250 2362.000 -999.250 -999.250 -999.250 -999.250 -999.250 1153.000 39.938 1929.775 27.967 10.000 0.198 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE · FLIC VERSION · O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · O01CO1 DATE · 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-FEB-~Vf9 11:15 PAGE: FILE lvTJMBER: 2 EDITED CASED HOLE Mi~IN P2LgS Depth shifted and clipped curves for open hole logs run into casing. PASS NUMBER: 1 DEPTH INCREMENT: O. 5000 FILE StC4MARY LDWG TOOL CODE START DEPTH CNT 10863.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) STOP DEPTH 10827.0 BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... CNT REMARKS: THIS FILE CONTAINS THE CLIPPED MAIN PASS CNTDATA RUN UP INTO CASING. ONLY CASED HOLE DATA IS PRESENTED IN THIS FILE. NO DEPTH SHIFTS HAVE BEEN APPLIED TO THIS DATA AS IT IS THE PRIMARY DEPTH CONTROL DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 48 4 56 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 21 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-FEB-i~' 11:15 PAGE: ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000 TENS DLL LB O0 000 O0 0 2 1 1 4 68 0000000000 TEND DLL LB O0 000 O0 0 2 t 1 4 68 0000000000 GRCH DLL GAPI O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNT O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNT O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNT PU-S O0 000 O0 0 2 1 1 4 68 0000000000 CPHI CNT PU-S O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 10863.000 TENS.DLL 1153.000 TEND.DLL 1132.392 GRCH.DLL CNTC. CNT 1922.715 CFTC. CNT 779.929 FCNT. CNT 716.906 NCNT. CNT CRAT. CNT 2.637 NRAT. CNT 2.820 NPHI.CNT 30.540 CPHI.CNT DEPT. 10827.000 TENS.DLL 1129.000 TEND.DLL 1128.836 GRCH.DLL CNTC. CNT 1105.356 CFTC. CNT 251.531 FCNT. CNT 270.371 NCNT. CNT CRAT. CNT 4.562 NRAT. CNT 4.953 NPHI.CNT 65.409 CPHI.CNT 104.234 1929.775 27.967 54.942 1042.200 61.740 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION · O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-FEB-i~ 11:15 PAGE: 7 FILE HEADER FILE NUMBER 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUPfiVARY VENDOR TOOL CODE START DEPTH STOP DEPTH PEX 12888.0 10863.0 BHC 12888.0 10863 . 0 HALS 12888.0 10863.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SONDE PEX PLATFORM EXPRESS HALS HIGH RES AZ LATEROLOG $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH : FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (0H394) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): 29-NOV-98 8Cl-205 200 29-NOV-98 1400 29-NOV-98 12891.0 12891.0 10860.0 12870.0 1800.0 TOOL NUMBER DSLT-FTB AMS- A H I L TB - FTB HALS-B 6. 000 10863.0 10863.0 FLOPRO ( WBM- KCL ) 8.75 55.0 8.5 190.0 0.131 65.0 O. 099 65.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-FEB-I~-~9~ 11:15 PAGE: MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : 0.108 65.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.0 REMARKS: DEPTH BASED ON DRILLERS PIPE TALLY. STANDOFFS RUN ON HALS AND BHC SONIC. TOOLS RUN DRILLPIPE CONVEYED. SANDSTONE MATRIX = 2. 65 G/C3 ~IDEN = 56 US DTM TOOL TURNERS RUN ON NEUTRON TOOL. NO SPEED CORRECTION APPLIED. WINDOW FROM 10863 '- 10878' . THIS FILE CONTAINS THE RAW MAIN PASS OPEN HOLE PEX/BHC/HALS DATA PRESENTED AT .5' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 140 4 66 i 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 7 12 68 13 66 0 14 65 FT 15 66 68 16 66 t 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-FEB-i~-~ 11:15 PAGE: ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE ~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 3 1 1 4 68- 0000000000 SP HALS MV O0 000 O0 0 3 1 1 4 68 0000000000 GR HALS GAPI O0 000 O0 0 3 1 1 4 68 0000000000 TENS HALS LB O0 000 O0 0 3 1 1 4 68 0000000000 HTENHALS LB O0 000 O0 0 3 1 1 4 68 0000000000 MRES HALS OH~Of O0 000 O0 0 3 1 1 4 68 0000000000 MTEMHALS DEGF O0 000 O0 0 3 ! 1 4 68 0000000000 GDEV HALS DEG O0 000 O0 0 3 1 1 4 68 0000000000 CNTC PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000 CFTC PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000 RCFT PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000 RCNT PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000 TNRA PEX O0 000 O0 0 3 1 1 4 68 0000000000 RTNR PEX O0 000 O0 0 3 1 1 4 68 0000000000 TNPH PEX PU O0 000 O0 0 3 ! 1 4 68 0000000000 NPHI PEX PU O0 000 O0 0 3 1 1 4 68 0000000000 NPOR PEX PU O0 000 O0 0 3 1 1 4 68 0000000000 DT BHC US/F O0 000 O0 0 3 1 1 4 68 0000000000 TT1 BHC US O0 000 O0 0 3 1 1 4 68 0000000000 TT2 BHC US O0 000 O0 0 3 1 i .4 68 0000000000 TT3 BHC US O0 000 O0 0 3 1 1 4 68 0000000000 TT4 BHC US O0 000 O0 0 3 1 1 4 68 0000000000 HCAL PEX IN O0 000 O0 0 3 1 1 4 68 0000000000 RHOZ PEX G/C3 O0 000 O0 0 3 1 1 4 68 0000000000 HDRA PEX G/C3 O0 000 O0 0 3 1 1 4 68 0000000000 PEFZ PEX O0 000 O0 0 3 I 1 4 68 0000000000 DPHZ PEX PU O0 000 O0 0 3 1 1 4 68 0000000000 H~IN PEX OH~/R4 O0 000 O0 0 3 1 1 4 68 0000000000 tOINOPEX OPRVk4 O0 000 O0 0 3 1 1 4 68 0000000000 RXOZ PEX OH~k4 O0 000 O0 0 3 ! 1 4 68 0000000000 RX08 PEX OH~OI O0 000 O0 0 3 1 1 4 68 0000000000 HLLD HALS OH~4 O0 000 O0 0 3 1 1 4 68 0000000000 HLLS HALS OtROI O0 000 O0 0 3 1 1 4 68 0000000000 HRLD HALS OH~ff4 O0 000 O0 0 3 1 1 4 68 0000000000 HRLS HALS OHNN O0 000 O0 0 3 t 1 4 68 0000000000 * * DA TA * * DEPT. 12888.000 SP.HALS HTEN.HALS -59.646 M~ES.HALS CNTC.PEX 3887.195 CFTC. PEX TNRA.PEX 2.120 RTAFR.PEX NPOR.PEX 22.332 DT. BHC TT3.BHC 583.281 TT4.BHC HDRA.PEX -999.250 PEFZ.PEX H~NO. PEX 4.622 R~OZ.PEX HLLS.HALS 10.848 HRLD.HALS 69.313 0.036 1860.387 2 185 92 090 393 984 -999 250 6 491 13 500 GR.HALS 47.480 TENS.~S MTEM. HALS 216.134 GDEV. HALS RCFT. PEX 1721.319 RCNT. PEX TNPH. PEX 22.574 NPHI.PEX TT1.BHC 589.688 TT2.BHC HCAL. PEX 5.978 RHOZ.PEX DPHZ. PEX 60721.211 5~4IN. PEX P~O8.PEX 6.491 HLLD.HALS ~LS.H_ALS 11.915 1365.000 -999.250 3785.963 23.224 410.625 -999.250 6.018 12.730 LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE 10 DEPT. 10863. 000 SP. HALS HTEN. HALS 1132. 392 ~!P~ES . HALS CNTC. PEX 1922. 715 CFTC. PEX TNRA. PEX 2. 637 RTNR. PEX NPOR. PEX 26. 626 DT. BHC TT3 . BHC 409 . 805 TT4 . BHC HDRA . PEX O . 570 PEFZ . PEX H~NO. PEX 0.198 RXOZ. PEX HLLS. HALS O. 149 HRLD. HALS 53.750 GR. HALS O. 078 MTEM. HALS 779. 929 RCFT. PEX 2. 820 TNPH. PEX 60.527 TT1. BHC 261. 680 HCAL. PEX 10. 000 DPHZ. PEX 0.258 RXOS.PEX O. 196 HRLS. HALS 104. 234 TENS. HALS 1153 143. 619 GDEV. HALS 39 716. 906 RCNT. PEX 1929 27.967 NPHI.PEX 30 380. 742 TT2 .BHC 269 6. 456 P~tOZ.PEX 3 -69. 004 H~IN. PEX 0 0 . 212 HLLD. HALS 0 O. 249 000 938 775 540 297 789 298 124 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE · FLIC VERSION · O01CO1 DATE · 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE ' FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 4 RAW OPEN HOLE ~IN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: O. 1 667 FILE SUMMARY VENDOR TOOL CODE START DEPTH PEX 12888.0 BHC 12888.0 HALS 12888.0 STOP DEPTH 10863.0 10863.0 10863.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: 11 LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SONDE PEX PLATFORM EXPRESS HALS HIGH RES AZ LATEROLOG $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TENPERATURE (DEGF) : RESISTIVITY (Oh?4N) AT TEMPERATURE (DEGF) '. MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) 29-NOV-98 8C1-205 200 29-NOV-98 1400 29-NOV-98 12891.0 12891.0 10860.0 12870.0 1800.0 REMARKS: TOOL NUMBER ........... DSL T- FTB HILTB- FTB HAL S - B 6. 000 10863.0 10863.0 FLOPRO (WBM-KCL) 8.75 55.0 8.5 190.0 THERM~AL SANDSTONE 2.65 DEPTH BASED ON DRILLERS PIPE TALLY. STANDOFFS RUN ONHALSANDBHC SONIC. TOOLS RUN DRILLPIPE CONVEYED. SANDSTONE MATRIX = 2.65 G/C3 ~4~EN = 56 US TOOL TURNERS RO~I ON NEUTRON TOOL. O. 131 65.0 0.099 65.0 O. 108 65.0 !.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-FEB-~9 11:15 PAGE: 12 NO SPEED CORRECTION APPLIED. WINDOW FROM 10863'- 10878'. THIS FILE CONTAINS THE RAW MAIN PASS OPEN HOLE PEX/BHC/HALS DATA ACQUIRED AT .1667' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 96 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 10 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NY]MB NUMB SiZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD ArUMB SAMP EL~ CODE (HEX) DEPT FT O0 000 O0 0 4 1 i 4 68 0000000000 RHOZ PEX G/C3 O0 000 O0 0 4 1 i 4 68 0000000000 . HDRA PEX G/C3 O0 000 O0 0 4 1 i 4 68 0000000000 PEFZ PEX O0 000 O0 0 4 1 1 4 68 0000000000 DPHZ PEX PU O0 000 O0 0 4 1 1 4 68 0000000000 HMIN PEX OH~k4 O0 000 O0 0 4 1 1 4 68 0000000000 HMNO PEX OHI~4 O0 000 O0 0 4 1 i 4 68 0000000000 RXOZ PEX OB?4~ O0 000 O0 0 4 i i 4 68 0000000000 RX08 PEX OH~k4 O0 000 O0 0 4 1 i 4 68 0000000000 HCNT PEX CPS O0 000 O0 0 4 ! 1 4 68 0000000000 HCFT PEX CPS O0 000 O0 0 4 1 1 4 68 0000000000 HGR PEX GAPI O0 000 O0 0 4 1 i 4 68 0000000000 RHFT PEX CPS O0 000 O0 0 4 1 1 4 68 0000000000 RHNT PEX CPS O0 000 O0 0 4 ! ! 4 68 0000000000 HTNP PEX PU O0 000 O0 0 4 1 1 4 68 0000000000 LIS T~P~~ Verification Listing Schlumberger Alaska Computing Center 9-FEB-lb~.. 11:15 PACE: 13 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) HNPO PEX PU O0 000 O0 0 4 1 1 4 68 0000000000 TT1 BHC US O0 000 O0 0 4 1 1 4 68 0000000000 TT2 BHC US O0 000 O0 0 4 ! 1 4 68 0000000000 TT3 BHC US O0 000 O0 0 4 1 1 4 68 0000000000 TT4 BHC US O0 000 O0 0 4 1 1 4 68 0000000000 HLLD HALS OHNk4 O0 000 O0 0 4 1 1 4 68 0000000000 HLLS HALS OHNk4 O0 000 O0 0 4 1 1 4 68 0000000000 HRLD HALS OH~ff4 O0 000 O0 0 4 1 1 4 68 0000000000 HRLS HALS OH~fl~ O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 12888.000 RHOZ.PEX -999.250 HDRA.PEX DPHZ.PEX 60721.211 H~IN. PEX 6.018 PiMNO.PEX RXO8.PEX 6.491 HCNT. PEX 3887.195 HCFT. PEX RHFT. PEX 1721.319 RHNT. PEX 3785.963 HTNP. PEX TT1.BHC 589.688 TT2.BHC 410.625 TT3.BHC HLLD.HALS 12.730 HLLS.HALS 10.848 HRLD.HALS -999 250 4 622 1860 387 22 574 583 281 13 500 PEFZ.PEX RXOZ.PEX HGR.PEX HNPO.PEX TT4.BHC HRLS.HALS -999.250 6.491 47.480 22.332 393.984 11.915 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION · O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE FILE HEADER FILE NUMBER 5 RAW OPEN HODEMAIN PASS LIS Ta~' Verification Listing Schlumberger Alaska Computing Center 9-FEB-i~ll:I$ PAGE: 14 Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: O. 0833 FILE SUSff4ARY VENDOR TOOL CODE START DEPTH PEX 12888.0 BHC 12888.0 HALS 12888.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH 10863.0 10863.0 10863.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SONDE PEX PLATFORM EXPRESS HALS HIGH RES AZ LATEROLOG $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): ~,L~XIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~4) AT T~4PERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT): MUD CAKE AT (MT): MUD CAKE AT (BHT) : 29-NOV-98 8Cl-205 200 29-NOV-98 1400 29-NOV-98 12891.0 12891.0 10860.0 12870.0 1800.0 TOOL NUMBER DSL T - FTB AMS-A HILTB-FTB 6. 000 10863.0 10863.0 FLOPRO (WBM-KCL) 8.75 55.0 8.5 190,0 0.131 65.0 O. 099 65.0 O. 108 65.0 LIS Ta~ Verification Listing Schlumberger Alaska Computing Center 9-FEB-i~911:15 PAGE: 15 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.0 REMARKS: DEPTH BASED ON DRILLERS PIPE TALLY. STANDOFFS RUN ON HALS AND BHC SONIC. TOOLS RUN DRILLPIPE CONVEYED. SANDSTONE MATRIX = 2. 65 G/C3 NiDEN = 56 US DTM TOOL TURNERS RUN ON NEUTRON TOOL. NO SPEED CORRECTION APPLIED. WINDOW FROM 10863'- 10878'. THIS FILE CONTAINS THE RAW MAIN PASS OPEN HOLE PFZ~/BHC/HALS DATA ACQUIRED AT .0833' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 i 5 66 6 73 7 65 8 68 0.083 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-FEB-h~g~9 11:15 PAGE: 16 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB ~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT O0 000 O0 0 5 1 1 4 68 0000000000 HCAL PEX IN O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 12888.000 HCAL.PEX 5.978 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUNk4ARY VENDOR TOOL CODE START DEPTH STOP DEPTH PEX 11087.0 10863.0 BHC 11087.0 10863.0 LIS T~p~e Verification Listing Schlumberger Alaska Computing Center 9-FEB-i~ll:15 PAGE: 17 HALS 11087.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): 10863.0 29-NOV-98 8Cl-205 200 29-NOV-98 1400 29-NOV-98 12891.0 12891.0 10860.0 12870.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SONDE PEX PLATFORM EXPRESS HALS HIGH RES AZ LATEROLOG $ TOOL NUMBER DSL T - FTB AMS - A HILTB-FTB HALS - B BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6. 000 10863.0 10863.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH : FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~4M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : FLOPRO (WBM-KCL) 8.75 55.0 8.5 190.0 O. 131 65.0 0.099 65.0 0.108 65.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): ~fATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): i.0 REMARKS: DEPTH BASED ON DRILLERS PIPE TALLY. STANDOFFS RUN ON HALS ~ BHC SONIC. TOOLS RUN DRILLPIPE CONVEYED. SANDSTONE MATRIX = 2.65 G/C3 ~4DEN = 56 US DTM LIS T~ Verification Listing Schlumberger Alaska Computing Center 9-FEB-i~9 11:15 PAGE: 18 TOOL TURNERS RUN ON NEUTRON TOOL. NO SPEED CORRECTION APPLIED. WINDOW FROM 10863'- 10878'. THIS FILE CONTAINS THE RAW, SHALLOW REPEAT PASS PEX/BHC/HALS DATA ACQUIRED AT .5' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 72 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 14 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (H~} DEPT FT O0 000 O0 0 6 i 1 4 68 0000000000 SP HALS MV O0 000 O0 0 6 1 1 4 68 0000000000 GR HALS GAPI O0 000 O0 0 6 t i 4 68 0000000000 TENS HALS LB O0 000 O0 0 6 1 1 4 68 0000000000 HTEN HALS LB O0 000 O0 0 6 i 1 4 68 0000000000 MRES HALS OI~4M O0 000 O0 0 6 i 1 4 68 0000000000 MTEMHALS DEGF O0 000 O0 0 6 i 1 4 68 0000000000 GDEV HALS DEG O0 000 O0 0 6 I 1 4 68 0000000000 CNTC PEX CPS O0 000 O0 0 6 ! 1 4 68 0000000000 CFTC PEX CPS O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PEX CPS O0 000 O0 0 6 1 1 4 68 0000000000 RCNT PEX CPS O0 000 O0 0 6 i 1 4 68 0000000000 TNRA PEX O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PEX O0 000 O0 0 6 I 1 4 68 0000000000 Schlumberger Alaska Computing Center 9-FEB-i~97/9 11:15 PAGE: 19 NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) TNPH PEX PU O0 000 O0 0 6 1 1 4 68 0000000000 NPHI PEX PU O0 000 O0 0 6 1 1 4 68 0000000000 NPOR PEX PU O0 000 O0 0 6 1 1 4 68 0000000000 DT BHC US/F O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 11087.000 SP.HALS 44.375 GR.HALS 63.307 TENS.HALS HTEN. HALS 1153.951 MRES.HALS 0.083 MTEM. HALS 141.981 GDEV. HALS CNTC. PEX 2946.090 CFTC. PEX 1394.855 RCFT. PEX 1299.456 RCNT. PEX TNRA.PEX 2.155 RTNR.PEX 2.221 TNPH. PEX 22.925 NPHI.PEX NPOR.PEX 22.603 DT. BHC 84.570 825.000 -999.250 2876.378 23.772 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : 001C01 DATE · 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION · O01CO1 DATE · 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, Cool string, and run in separate files. RUN NUMBER: i TOOL STRING NUMBER: i PASS NUMBER: 2 DEPTH INCR~4ENT: O. i 667 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-FEB-i~9 11:15 PAGE: 20 FILE SUtO~a~Y VENDOR TOOL CODE START DEPTH PEX 11087.0 BHC 11087.0 HALS 11087.0 $ LOG HEADER DATA STOP DEPTH .......... 10863.0 10863.0 10863.0 DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE ................ BHC AMS PEX HALS $ TOOL TYPE COMP. SONIC AUX. MEAS. SONDE PLATFORM EXPRESS HIGH RES AZ LATEROLOG BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) RESISTIVITY (0H3~4) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) MUD AT BOTTOM HOLE TEMPERATURE (BHT) MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : NEUTRON TOOL TOOL TYPE (EPITHERF~L OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 29-NOV-98 8Cl-205 200 29-NOV-98 1400 29-NOV-98 12891.0 12891.0 10860.0 12870.0 1800.O TOOL NUMBER DSLT- FTB AMS- A HIL TB - FTB 6.000 10863.0 10863.0 FLOPRO (WBM-KCL) 8.75 55.0 8.5 190.0 O. 131 65.0 O. 099 65.0 0.108 65. 0 THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): !. 0 LIS T~e Verification Listing Schlumberger Alaska Computing Center 9-FEB-i'~--~9 11:15 PAGE: 21 REMARKS: DEPTH BASED ON DRILLERS PIPE TALLY. STANDOFFS RUN ON HALS AND BHC SONIC. TOOLS RUN DRILLPIPE CONVEYED. SANDSTONE MATRIX = 2.65 G/C3 ~IDEN = 56 US DTM TOOL TURNERS RUN ON NEUTRON TOOL. NO SPEED CORRECTION APPLIED. WINDOW FROM 10863 '- 10878'. THIS FILE CONTAINS THE RAW, SHALLOW REPEAT PASS PEX/BHC/HALS DATA ACQUIRED AT .1667' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 96 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 10 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE Nt~4B NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 7 i i 4 68 0000000000 RHOZ PEX G/C3 O0 000 O0 0 7 I I 4 68 0000000000 HD~ PEX G/C3 O0 000 O0 0 7 t 1 4 68 0000000000 PEFZ PEX O0 000 O0 0 7 1 1 4 68 0000000000 DPHZ PEX PU O0 000 O0 0 7 1 1 4 68 0000000000 H~IN PEX OH~fl~ O0 000 O0 0 7 i 1 4 68 0000000000 HMNO PEX OHI~M O0 000 O0 0 7 i 1 4 68 0000000000 RXOZ PEX OH~I O0 000 O0 0 7 i 1 4 68 0000000000 RX08 PEX OH~4~ O0 000 O0 0 7 I ! 4 68 0000000000 LIS ~p~e Verification Listing Schlumberger Alaska Computing Center 9-FEB-i~ 11:15 PAGE: 22 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) HCNT PEX CPS O0 000 O0 0 7 1 1 4 68 0000000000 HCFT PEX CPS O0 000 O0 0 7 1 1 4 68 0000000000 HGR PEX GAPI O0 000 O0 0 7 1 1 4 68 0000000000 RHFT PEX CPS O0 000 O0 0 7 1 1 4 68 0000000000 RHNT PEX CPS O0 000 O0 0 7 1 1 4 68 0000000000 HTNP PEX PU O0 000 O0 0 7 1 1 4 68 0000000000 HNPO PEX PU O0 000 O0 0 7 1 1 4 68 0000000000 TT1 BHC US O0 000 O0 0 7 1 1 4 68 0000000000 TT2 BHC US O0 000 O0 0 7 1 1 4 68 0000000000 TT3 BHC US O0 000 O0 0 7 1 1 4 68 0000000000 TT4 BHC US O0 000 O0 0 7 1 1 4 68 0000000000 HLLD HALS OH~4~ O0 000 O0 0 7 1 1 4 68 0000000000 HLLS HALS OH~4 O0 000 O0 0 7 1 1 4 68 0000000000 HRLDHALS 0H~94 O0 000 O0 0 7 1 1 4 68 0000000000 HRLS HALS 0H~94 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 11087.000 RHOZ.PEX -999 250 HDRA.PEX -999.250 PEFZ.PEX -999.250 DPHZ.PEX 60721.211 HMIN. PEX 0 937 H~INO.P~ 1.467 RXOZ.PEX 5.853 RXO8.PEX 5.864 HCNT. PEX 2946 090 HCFT. PEX 1394.855 HGR.PEX 63.307 RHFT. PEX 1299.456 RHNT. PEX 2876 378 HTNP.PEX 22.925 HNPO.PEX 22.603 TT1.BHC 494.922 TT2.BHC 327 344 TT3.BHC 528.672 TT4.BHC 357.969 HLLD.HALS 6.683 HLLS.HALS 6 128 HRLD.HA~S 5.903 HRLS.HALS 5.848 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE · FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE · FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS 'T~pe Verification Listing Schlumberger Alaska Computing Center 9-FEBrUarY99 11:15 PAGE: 23 FILE HEADER FILENUMBER 8 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NTJMBER: 2 DEPTH INCREMENT: 0.0833 FILE S07vfl~ARY VENDOR TOOL CODE START DEPTH STOP DEPTH PEX 11087.0 10863.0 BHC 11087.0 10863.0 HALS 11087.0 10863.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SOk~E PEX PLATFORM EXPRESS HALS HIGH RES AZ LATEROLOG $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH : FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (0P2~4) AT TEMPERATO~E (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TE24PERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): 29-NOV-98 8Cl-205 200 29-NOV-98 1400 29-NOV-98 12891.0 12891.0 10860.0 12870.0 1800.0 TOOL NUMBER DSL T - FTB AMS - A HILTB - FTB HALS- B 6. 000 10863.0 10863.0 FLOPRO (WBM-KCL) 8.75 55.0 8.5 190.0 O. 131 65.0 O. 099 65.0 0.108 65.0 LIS'~TaPe Verification Listing Schlumberger Alaska Computing Center 9-FEB~-~9'99 11:15 PAGE: 24 MUD CAKE AT (BHT): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): i. 0 REMARKS: DEPTH BASED ON DRILLERS PIPE TALLY. STANDOFFS RUN ON HALS AND BHC SONIC. TOOLS RUN DRILLPIPE CONVEYED. SANDSTONE MATRIX = 2. 65 G/C3 ~iDEN = 56 US DTM TOOL TURNERS RUN ON NEUTRON TOOL. NO SPEED CORRECTION APPLIED. WINDOW FROM 10863'- 10878'. THIS FILE CONTAINS THE RAW, SHALLOW REPEAT PASS PEX/BHC/HALS DATA ACQUIRED AT .0833' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 1 $ 66 6 73 7 65 8 68 0.083 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-FEB~99 11:15 PAGE: 25 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT O0 000 O0 0 8 1 1 4 68 0000000000 HCAL PEX IN O0 000 O0 0 8 1 1 4 68 0000000000 ** DATA ** DEPT. 11087.000 HCAL.PEX 5.956 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION · O01CO1 DATE · 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .009 SERVICE · FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NU?4BER 9 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, nool string, and run in separate files. RUN N~4BER: 1 TOOL STRING ~FUMBER: 1 PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUFkZ~Y VENDOR TOOL CODE START DEPTH STOP DEPTH PEX 11518.0 11333.0 BHC 11518.0 11333.0 LIS T~pe Verification Listing Schlumberger Alaska Computing Center PAGE: 26 HALS LOG HEADER DATA 11518.0 11333.0 DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SONDE PEX PLATFORM EXPRESS HALS HIGH RES AZ LATEROLOG $ 29-NOV-98 8Cl-205 200 29-NOV-98 1400 29-NOV-98 12891.0 12891.0 10860.0 12870.0 1800.0 TOOL ~ER DSL T- FTB AMS - A HILTB-FTB HALS-B BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6. 000 10863.0 10863.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : FLOPRO (WBM-KCL) 8.75 55.0 8.5 190.0 O. 131 65.0 O. 099 65.0 O. 108 65.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SAArD STONE 2.65 TOOL STANDOFF (IN): 1.0 REMARKS: DEPTH BASED ON DRILLERS PIPE TALLY. STANDOFFS RUN ON HALS AND BHC SONIC. TOOLS R UNDRILLPIPE CONVEYED. SANDSTONE MATRIX = 2.65 G/C3 M~EN = 56 US DTM LIS ~a~e Verification Listing Schlumberger Alaska Computing Center PAGE: 27 TOOL TURNERS RUN ON NEUTRON TOOL. NO SPEED CORRECTION APPLIED. WINDOW FROM 10863'- 10878'. THIS FILE CONTAINS THE RAW DEEP REPEAT PASS PEX/BHC/HALS DATA ACQUIRED AT .5' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 72 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT ll 66 14 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 * * SET TYPE - CHAN * * NAME SERV UNIT SERVICE API API API API FILE NO~IB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NU~4B S~u~P EL~T4 CODE (HEX) DEPT FT O0 000 O0 0 9 i ! 4 68 0000000000 SP HALS RlW O0 000 O0 0 9 ! i 4 68 0000000000 GR HALS GAPI O0 000 O0 0 9 i t 4 68 0000000000 HALS HALS LB O0 000 O0 0 9 ! 1 4 68 0000000000 HALS HALS LB O0 000 O0 0 9 i 1 4 68 0000000000 HALS HALS Oh?~4 O0 000 O0 0 9 1 1 4 68 0000000000 HALS HALS DEGF O0 000 O0 0 9 i 1 4 68 0000000000 GDEVHALS DEG O0 000 O0 0 9 i 1 4 68 0000000000 CNTC PEX CPS O0 000 O0 0 9 t ! 4 68 0000000000 CFTC PEX CPS O0 000 O0 0 9 1 1 4 68 0000000000 RCFT PEX CPS O0 000 O0 0 9 ! 1 4 68 0000000000 RCNT PEX CPS O0 000 O0 0 9 1 i 4 68 0000000000 TNRA PEX O0 000 O0 0 9 Z 1 4 68 0000000000 RTNR PEX O0 000 O0 0 9 i 1 4 68 0000000000 LIS -~e Verification Listing Schlumberger Alaska Computing Center 9-FEB~I~99 11:15 PAGE: 28 NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) TNPH PEX PU O0 000 O0 0 9 1 1 4 68 0000000000 NPHI PEX PU O0 000 O0 0 9 1 1 4 68 0000000000 NPOR PEX PU O0 000 O0 0 9 1 1 4 68 0000000000 DT BHC US/F O0 000 O0 0 9 1 1 4 68 0000000000 ** DATA ** DEPT. 11518.000 SP.HALS 45.063 GR.HA~S 41.890 HALS.HALS HALS.HALS -1411.364 HALS.HALS 0.074 HALS.HALS 143.152 GDEV. HALS CNTC. PEX 3171.315 CFTC.PEX 1095.612 RCFT. PEX 1028.284 RCNT. PEX TNRA.PEX 2.939 RTNR.PEX 3.028 TNPH. PEX 35.126 NPHI.PEX NPOR.PEX 34.733 DT.BHC 84.043 DEPT. 11333.000 SP.HALS 42.813 GR.HALS 38.743 HALS.HALS HALS.HALS 563.800 HALS.HALS 0.083 ~S.~S 141.671 GDEV. HALS CNTC. PEX 3359.729 CFTC.PEX 1638.751 RCFT. PEX 1397.816 RCNT. PEX TNRA.PEX 2.095 RTNR.PEX 2.263 TNPH. PEX 21.931 NPHI.PEX NPOR.PEX 20.982 DT.BHC 85.254 707.000 -999.250 3094.060 36.392 1591.000 83.053 3086.980 22.778 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE · 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .0t0 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 10 RAW OPEN HOLE REPEAT PASSES LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-FEB'-~99 11:15 PAGE: 29 Curves a~d log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 3 DEPTH INCREMENT: 0.1667 FILE SUM~fARY VENDOR TOOL CODE START DEPTH PEX 11518.0 BHC 11518.0 HALS 11518.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH 11333.0 11333.0 11333.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AOX. MEAS. SONDE PEX PLATFORM EXPRESS HALS HIGH RES AZ LATEROLOG BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OHNk4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : NEUTRON TOOL 29-NOV-98 8Cl-205 200 29-NOV-98 1400 29-NOV-98 12891.0 12891.0 10860.0 12870.0 1800.0 TOOL NUMBER DSL T - FTB AMS- A HILTB - FTB HALS - B 6. 000 10863.0 10863.0 FLOPRO (WBM-KCL) 8.75 55.0 8.5 190.0 O. 131 65.0 0.099 65.0 O. 108 65.0 LIS ~ape Verification Listing Schlumberger Alaska Computing Center PAGE: 30 TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): 1.0 REMARKS: DEPTH BASED ON DRILLERS PIPE TALLY. STANDOFFS RUN ON HALS AND BHC SONIC. TOOLS RUN DRILLPIPE CONVEYED. SANDSTONE MATRIX = 2.65 G/C3 ~IDEN = 56 US DTM TOOL TURNERS RUN ON NEUTRON TOOL. NO SPEED CORRECTION APPLIED. WINDOW FROM 10863'- 10878'. THIS FILE CONTAINS THE RAW DEEP REPEAT PASS PEX/BHC/HALS DATA ACQUIRED AT .1667' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 96 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 10 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** N~'4E SERV UNIT SERVICE API API API API FILE ~FUM~ ~ItT~B SiZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~I4 CODE (HEX) DEPT FT O0 000 O0 0 10 1 i 4 68 0000000000 RHOZ PEX G/C3 O0 000 O0 0 10 1 1 4 68 0000000000 HDRA PEX G/C3 O0 000 O0 0 10 1 1 4 68 0000000000 LIS Tape verification Listing Schlumberger Alaska Computing Center 9-FEB-1999 11 ..15 PAGE: 31 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) PEFZ PEX O0 000 O0 0 10 1 1 4 68 0000000000 DPHZ PEX PU O0 000 O0 0 10 1 1 4 68 0000000000 HMIN PEX OH~k4 O0 000 O0 0 10 1 1 4 68 0000000000 H~INOPEX OHMM O0 000 O0 0 10 1 1 4 68 0000000000 RXOZ PEX OH~ff4 O0 000 O0 0 10 1 1 4 68 0000000000 R~08 PEX OI~V~ O0 000 O0 0 10 1 1 4 68 0000000000 HCNT PEX CPS O0 000 O0 0 10 1 1 4 68 0000000000 HCFT PEX CPS O0 000 O0 0 10 1 1 4 68 0000000000 HGR PEX GAPI O0 000 O0 0 10 1 1 4 68 0000000000 RHFT PEX CPS O0 000 O0 0 10 1 1 4 68 0000000000 RHNT PEX CPS O0 000 O0 0 10 ! 1 4 68 0000000000 HTNP PEX PU O0 000 O0 0 10 1 1 4 68 0000000000 HNPO PEX PU O0 000 O0 0 10 1 1 4 68 0000000000 TT1 BHC US O0 000 O0 0 10 1 1 4 68 0000000000 TT2 BHC US O0 000 O0 0 10 1 1 4 68 0000000000 TT3 BHC US O0 000 O0 0 10 1 1 4 68 0000000000 TT4 BHC US O0 000 O0 0 10 1 1 4 68 0000000000 HLLD HALS Oh?4M O0 000 O0 0 10 1 1 4 68 0000000000 HLLS HALS OH~4~ O0 000 O0 0 10 1 1 4 68 0000000000 HRLDHALS OH~I O0 000 O0 0 10 1 1 4 68 0000000000 HRLS HALS OP~4~I O0 000 O0 0 10 1 1 4 68 0000000000 ** DATA ** DEPT. 11518.000 RHOZ.PEX -999.250 HDRA.PEX -999.250 PEFZ.PEX -999.250 DPHZ.PEX 60721.211 HMIN. PEX 0.538 HMNO. PEX 0.493 RXOZ.PEX 0.590 RXO8.PEX 0.592 HCNT. PEX 3171.315 HCFT. PEX 1095.612 HGR.PEX 41.890 RHFT. PEX 1028.284 RHNT. PEX 3094.060 HTNP. PEX 35.126 HNPO. PEX 34.733 TT1.BHC 539.844 TT2.BHC 371.172 TT3.BHC 533.047 TT4.BHC 365.547 HLLD.HALS 7.150 HLLS.HALS 6.680 HRLD.HALS 6.450 HRLS.HALS 6.394 DEPT. 11333.334 RHOZ.PF~ 2 390 HDRA. PEX 0.004 PEFZ.PEX DPHZ.PEX 15.775 HMIN. PEX 1 556 H~INO. PEX 1.772 RXOZ.PEX RXO8.PEX 3.739 HCNT. PEX 3314 020 HCFT. PEX 1619.463 HGR.PEX RHFT. PEX 1333.765 RHNT.PEX 3036 150 HTNP. PEX 21.942 I~VPO.PEX TT1.BHC 516.484 TT2.BHC 346 914 TT3.BHC 517.891 TT4.BHC HLLD.HALS 6.519 HLLS.HALS 5 274 HRLD.HALS 3.961 HRLS.HALS 2.781 3.582 34.247 21.462 348.828 11.533 * * END OF DA TA * * LIS ~ape Verification Listing Schlumberger Alaska Computing Center 9-FEB-1999 11:15 PAGE: 32 **** FILE TRAILER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .011 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 11 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 3 DEPTH INCREME1TT: 0.0833 FILE SUA~fARY VENTDOR TOOL CODE START DEPTH PEX 11518.0 BHC 11518.0 HALS 11518.0 $ LOG HEADER DATA DATE LOGGED: SOFT,CARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): STOP DEPTH 11333.0 11333.0 11333.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SONDE 29-NOV-98 8Cl-205 200 29-NOV-98 1400 29-NOV-98 12891.0 12891.0 10860.0 12870.0 1800.0 TOOL NUMBER DSLT-FTB AMS - A LIS TaPe verification Listing Schlumberger Alaska Computing Center PAGE: 33 PEX HALS $ PLATFORM EXPRESS HIGH RES AZ LATEROLOG BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) MUD AT BOTTOM HOLE TEMPERATURE (BHT) ~ FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : HILTB-FTB HALS-B 6.000 10863.0 10863.0 FLOPRO (WBM-KCL) 8.75 55.0 8.5 190.0 O. 131 65.0 O. 099 65.0 O. 108 65.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN) : 1.0 REMARKS: DEPTH BASED ON DRILLERS PIPE TALLY. STANDOFFS RUN ON HALS AND BHC SONIC. TOOLS RUN DRILLPIPE CONVEYED. SANDSTONE MATRIX = 2. 65 G/C3 NDEN = 56 US DTM TOOL TURNERS RUN ON NEUTRON TOOL. NO SPEED CORRECTION APPLIED. WINDOW FROM 10863'~ 10878'. THIS FILE CONTAINS THE RAW DEEP REPEAT PASS PEX/BHC/HALS DATA ACQUIRED AT .0833' SAMPLE RATE. LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: 34 ** DATA FORMAT SPECIFICATION RECORD * * SET TYPE - 64LB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 1 5 66 6 73 7 65 8 68 0.083 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 ! ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CI~SS MOD iVUMB SAMP ELEM CODE (HEJ~) DEPT FT O0 000 O0 0 11 1 1 4 68 0000000000 HCAL PEX IN O0 000 O0 0 11 1 1 4 68 0000000000 ** DATA ** DEPT. 11518.000 HCAL.PEX 5.623 DEPT. 11333.084 HCAL.PEX 5.993 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .011 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-FEB-~9 11:15 PAGE: 35 **** FILE HEADER **** FILE NAME ~ EDIT .012 SERVICE · FLIC VERSION . O01CO1 DATE · 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 12 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 1 DEPTH INCREMENT: O. 5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH PEX 10863.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): STOP DEPTH .......... 10824.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE BHC AMS PEX HALS $ TOOL TYPE COMP. SONIC AUX. MEAS. SONDE PLATFORM EXPRESS HIGH RES AZ ~TEROLOG BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASIMG DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: 29-NOV-98 8Cl-205 200 29-NOV-98 1400 29-NOV-98 12891.0 12891.0 10860.0 12870.0 1800.0 TOOL NUMBER ........... DSLT-FTB AMS - A HILTB- FTB 6. 000 10863.0 10863.0 FLOPRO (WBM-KCL) 8.75 55.0 8.5 LIS Tap~e Verification Listing Schlumberger Alaska Computing Center 9-FEB-~'9 11:15 PAGE: 36 FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : 190.0 RESISTIVITY (OPL¢~t) AT Tt~4PERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 0.131 MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): O. 099 MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): O. 108 MUD CAKE AT (BHT) : 65.0 65.0 65.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SAND S TONE 2.65 TOOL STANDOFF (IN): 1.0 REMARKS: DEPTH BASED ON DRILLERS PIPE TALLY. STANDOFFS RUN ONHALSANDBHC SONIC. TOOLS RUN DRILLPIPE CONVEYED. SANDSTONE MATRIX = 2.65 G/C3 MDEN = 56 US TOOL TURNERS RUN ON NEUTRON TOOL. NO SPEED CORRECTION APPLIED. WINDOW FROM 10863'- 10878'. THIS FILE CONTAINS THE RAW MAIN PASS CASED HOLE PEX DATA ACQUIRED AT .5' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 2 66 0 2 66 0 3 73 52 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 2i 66 19 12 68 13 66 0 14 65 FT i5 66 68 i6 66 t LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-FEB-~9 11:15 PAGE: 37 TYPE REPR CODE VALUE 0 66 1 * * SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 12 1 1 4 68 0000000000 TENS HALS LB O0 000 O0 0 12 1 1 4 68 0000000000 HTENHALS LB O0 000 O0 0 12 1 1 4 68 0000000000 GR HALS GAPI O0 000 O0 0 12 i 1 4 68 0000000000 CNTC PEX CPS O0 000 O0 0 12 1 1 4 68 0000000000 CFTC PEX CPS O0 000 O0 0 12 1 1 4 68 0000000000 RCFT PEX CPS O0 000 O0 0 12 1 1 4 68 0000000000 RCNT PEX CPS O0 000 O0 0 12 1 1 4 68 0000000000 TNRA PEX O0 000 O0 0 12 1 1 4 68 0000000000 RTNR PEX O0 000 O0 0 12 i 1 4 68 0000000000 NPOR PEX PU O0 000 O0 0 12 1 1 4 68 0000000000 NPHI PEX PU O0 000 O0 0 12 1 1 4 68 0000000000 TNPH PEX PU O0 000 O0 0 12 1 1 4 68 0000000000 ** DATA ** DEPT. 10863.000 TENS.HALS 1153.000 HTEN. HA~S 1132.392 GR.HALS CNTC. PEX 1922.715 CFTC.PEX 779.929 RCFT. PEX 716.906 RCNT. PEX TNRA.PEX 2.637 RTNR.PEX 2.820 NPOR.PEX 26.626 NPHI.PEX TNPH. PEX 27.967 DEPT. 10824.500 TENS.HALS 1096.000 HTEN. HALS 1128.810 GR.HALS CNTC. PEX 1070.441 CFTC.PEX 252.183 RCFT. PEX 235.744 RCNT. PEX TNRA.PEX 4.519 RTNR.PEX 4.714 NPOR.PEX 49.861 NPHI. PEX TNPH. PEX 57.552 104.234 1929.775 30.540 56.233 1062.640 64.630 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION · O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: 38 **** FILE HEADER FILE NAME : EDIT .013 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 13 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 1 DEPTH INCREMENT: 0.1667 FILE SUNffZzARY VENDOR TOOL CODE START DEPTH PEX 10863.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): STOP DEPTH 10824.5 TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS . SONDE PEX PLATFORM EXPRESS HALS HIGH RES AZ LATEROLOG $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: 29-NOV-98 8Cl-205 200 29-NOV-98 1400 29-NOV-98 12891.0 12891.0 10860.0 12870.0 1800.O TOOL NOWBER DSL T- FTB AMS- A HILTB - FTB HA~ S - B 6. 000 10863.0 10863.0 FLOPRO (WBM-KCL) 8.75 55.0 8.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-FEB=~-J99 11:15 PAGE: 39 FLUID LOSS (C3): MAXIMUM RECORDED TEMPE~TURE (DEGF) : 190.0 RESISTIVITY (OH~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 0.131 MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): O. 099 MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): 0.108 MUD CAKE AT (BHT) : 65.0 65.0 65.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MA TRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAI~ SANDSTONE 2.65 TOOL STANDOFF (IN): 1.0 REMARKS: DEPTH BASED ON DRILLERS PIPE TALLY. STANDOFFS RUN ON HALS AND BHC SONIC. TOOLS RUN DRILLPIPE CONVEYED. SANDSTONE MATRIX = 2. 65 G/C3 MDEN = 56 US DTM TOOL TURNERS RUN ON NEUTRON TOOL. NO SPEED CORRECTION APPLIED. WINDOW FROM 10863'- 10878'. THIS FILE CONTAINS THE RAW MAIN PASS CASED HOLE PEX DATA ACQUIRED AT .1667' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 1i 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 LIS Ta~e Verification Listing Schlumberger Alaska Computing Center 9-FEBt~9 11:15 PAGE: 40 TYPE REPR CODE VALUE 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE ~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 13 1 1 4 68 0000000000 HCNT PEX CPS O0 000 O0 0 13 1 1 4 68 0000000000 HCFT PEX CPS O0 000 O0 0 13 1 1 4 68 0000000000 HGR PEX GAPI O0 000 O0 0 13 1 1 4 68 0000000000 RHFT PEX CPS O0 000 O0 0 13 1 1 4 68 0000000000 RHNT PEX CPS O0 000 O0 0 13 1 1 4 68 0000000000 HTNP PEX PU O0 000 O0 0 13 1 1 4 68 0000000000 HNPO PEX PU O0 000 O0 0 13 1 1 4 68 0000000000 ** DATA ** DEPT. 10863.000 HCNT. PEX 1921.082 HCFT. PEX RHFT. PEX 722.184 RHNT. PEX 1976.170 HTNP. PEX DEPT. 10824.834 HCNT. PEX 1063.602 HCFT. PEX RHFT. PEX 252.685 RHNT. PEX 984.356 HTNP. PEX 777.922 HGR.PEX 28.034 HNPO.PEX 232.831 HGR.PEX 67.175 HNPO.PEX 106. 536 25.837 55.04J 68.884 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .013 SERVICE · FLIC VERSION · O01CO1 DATE · 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .014 SERVICE · FLIC VERSION · O01CO1 DATE · 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS ~pe Verification Listing Schlumberger Alaska Computing Center 9-FEB-~=-_-~J9 11:15 PAGE: 41 FILE HEADER FILE NUMBER 14 RAW CASED HOLE REPEAT PASSES Curves and log header data for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE S~Y VENDOR TOOL CODE START DEPTH STOP DEPTH 10863.0 10774.0 PEX $ LOG HEADER DATA DATE LOGGED: 29-NOV- 98 SOF~¢ARE VERSION: 8Cl-205 TIME CIRCULATION ENDED: 200 29-NOV-98 TIME LOGGER ON BOTTOM: 1400 29-NOV-98 TD DRILLER (FT) : 12891.0 TD LOGGER (FT) : 12891.0 TOP LOG INTERVAL (FT) : 10860.0 BOTTOM LOG INTERVAL (FT) : 12870.0 LOGGING SPEED (FPHR): 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL ATOPI~ER BHC COMP. SONIC DSLT-FTB AMS AUX. MEAS. SONDE AMS-A PEX PLATFORM EXPRESS HILTB-FTB HALS HIGH RES AZLATEROLOG HALS-B $ BOREHOLE A3VD CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS bFUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): blAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (0H~24) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : 6. 000 10863.0 10863.0 FLOPRO (WBM-KCL) 8.75 55.0 8.5 190.0 0.131 65.0 0.099 65.0 O. 108 65.0 THERMAL, LIS T~pe Verification Listing Schlumberger Alaska Computing Center 9-FEB~'=~J9 11:15 PAGE: 42 MATRIX: SANDSTOiVE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): 1.0 REMARKS: DEPTH BASED ON DRILLERS PIPE TALLY. STANDOFFS RUN ON HALS AND BHC SONIC. TOOLS RUN DRILLPIPE CONVEYED. SANDSTONE MATRIX = 2. 65 G/C3 NiDEN = 56 US DTM TOOL TURNERS RUN ON NEUTRON TOOL. NO SPEED CORRECTION APPLIED. WINDOW FROM 10863'- 10878'. THIS FILE CONTAINS THE RAW SHALLOW REPEAT CASED HOLE PEX DATA ACQUIRED AT .5' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 52 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 19 12 68 13 66 0 14 65 FT 15 66 68 16 66 i 0 66 ! ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FiLE NDWB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NO~4B SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 14 1 1 4 68 0000000000 TENS HALS LB O0 000 O0 0 14 t 1 4 68 0000000000 HTEN HALS LB O0 000 O0 0 14 t 1 4 68 0000000000 GR HALS GAPI O0 000 O0 0 14 ! 1 4 68 0000000000 LIS ~e Verification Listing Schlumberger Alaska Computing Center 9-FEB==uJ9 11:15 PAGE: 43 NAME SERV UNIT SERVICE API API API API FILE NURiB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) CNTC PEX CPS O0 000 O0 0 14 1 1 4 68 0000000000 CFTC PEX CPS O0 000 O0 0 14 1 1 4 68 0000000000 RC?T PEX CPS O0 000 O0 0 14 1 1 4 68 0000000000 RCNT PEX CPS O0 000 O0 0 14 1 1 4 68 0000000000 TNRA PEX O0 000 O0 0 14 1 1 4 68 0000000000 RTNR PEX O0 000 O0 0 14 1 1 4 68 0000000000 NPOR PEX PU O0 000 O0 0 14 1 1 4 68 0000000000 NPHI PEX PU O0 000 O0 0 14 1 1 4 68 0000000000 TNPH PEX PU O0 000 O0 0 14 1 1 4 68 0000000000 ** DATA ** DEPT. 10863.000 TENS.HALS 1451.000 HTEN. HALS 1173.747 GR.HALS 108.956 CNTC. PEX 1933.425 CFTC. PEX 809.525 RCFT. PEX 805.221 RCNT. PEX 1984.608 TNRA.PEX 2.536 RTNR.PEX 2.760 NPOR.PEX 24.708 NPHI.PEX 29.033 TNPH. PEX 26.771 DEPT. 10774.000 TENS.HALS 1242.000 HTEN. HALS 1189.939 GR.HALS 61.167 CNTC. PEX 1196.991 CFTC. PEX 284.516 RCFT. PEX 307.096 RCNT.PEX 1157.317 TNRA.PEX 4.301 RTNR.PEX 5.077 NPOR.PEX 55. 668 NPHI.PEX 60.576 TNPH. PEX 56.593 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .014 SERVICE · FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .015 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS 'T~pe~ Verification Listing Schlumberger Alaska Computing Center 9-FEB -~_-~-~9 1! '.15 PAGE: 44 FILE HEADER FILE NUMBER 15 RAW CASED HOLE REPEAT PASSES Curves and log header data for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.1667 FILE SU~ARY VENDOR TOOL CODE START DEPTH PEX 10863.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): STOP DEPTH 10774.0 TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SONDE PEX PLATFORM EXPRESS HALS HIGH RES AZ LATEROLOG $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MOD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAS&IMUM RECORDED TEMPERATURE (DEGF) RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) MUD AT BOTTOM HOLE TEMPERATURE (BHT) MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (M~f) : MUD CAKE AT (BHT) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THE~) : 29-NOV-98 8C1-205 200 29-NOV-98 1400 29-NOV-98 12891.0 12891.0 10860.0 12870.0 1800.0 TOOL NUMBER DSL T - FTB AMS - A HIL TB - FTB HALS- B 6. 000 10863.0 10863.0 FLOPRO (WBM-KCL) 8.75 55.0 8.5 290.0 O. 131 65.0 O. 099 65.0 O. t08 65.0 THERMAL LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-FEB=~9 11:15 PACE: 46 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOC TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) RHFT PEX CPS O0 000 O0 0 15 1 1 4 68 0000000000 RHNT PEX CPS O0 000 O0 0 15 1 1 4 68 0000000000 HTNP PEX PU O0 000 O0 0 15 1 1 4 68 0000000000 HNPO PEX PU O0 000 O0 0 15 1 1 4 68 0000000000 ** DATA ** DEPT. 10863.000 HCNT. PEX 1933.029 HCFT. PEX 812.312 HCR.PEX RHFT. PEX 819.892 RHNT. PEX 1982.441 HTNP.PEX 26.636 HNPO.PEX DEPT. 10774.334 HCNT. PEX 1179.209 HCFT. PEX 287.077 HGR.PEX RHFT. PEX 237.245 RHNT. PEX 1110.163 HTNP.PEX 58.395 HNPO.PEX 99.534 24.609 61.845 58.441 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .015 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/ 8 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 99/02/ 8 ORIGIN : FLIC TAPE NAME : 99037 CONTINUATION # : 1 PREVIOUS TAPE : CO~4ENT : BP EXPLORATION, U-O9A, PRUDHOE BAY, API #50-029-21144-01 **** REEL TRAILER **** SERVICE NAME : EDIT DATE · 99/02/ 8 ORIGIN · FLIC REEL NAME · 99037 CONTINUATION # : PREVIOUS REEL : COFk4ENT · BP EXPLORATION, U-O9A, PRUDHOE BAY, APi #50-029-21144-01 Sperry-Sun Drilling Services LIS Scan Utility Tue May 25 10:18:17 1999 Reel Header Service name ............. LISTPE Date ..................... 99/05/25 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Tape Header Service name ............. LISTPE Date ..................... 99/05/25 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: MWD RUN 4 AK-MW-90011 C.ASUCHAK G. KIDD RECEIVED 1999 U- 0 9A ~,J~a 0ii& Gas Cons.Commission 5002 9211 ~ 01 Arl6,horage BP EXPLORATION (A3~ASKA), INC. SPERRY-SUN DRILLING SERVICES 25 -M_AY- 99 MWD RUN 5 AK-MW-90011 C. ASUCHAK G.W. CP~AIG 19 11 13E 168 1852 .00 76.20 47.40 WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 4.500 12891.0 6.000 12891.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 1,2,3 AND 6 CONTAIN NO VA_LID DATA AND ARE NOT PRESENTED. 3. MWD RUN 4 IS DIRECTIONAL WITH SCINTILLATION TYPE GAMMA RAY (NGP) . 4. MWD RUN 5 IS DIRECTIONAL WITH DUAL GAMMA R3kY (DGR) AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR-4) . 5. MWD DATA IS DEPTH SHIFTED/CORRECTED USING THE PEX/BHC/HALS PRINhXRY DEPTH CONTROL GAMMA P~AY LOGGED BY SCHLUMBERGER ON 29 NOVEMBER, 1998. 6. THIS WELL REACHED A TOTAL DEPTH OF 12892'MD, 9047'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA R3kY. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/05/25 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMM3LRY PBU TOOL CODE START DEPTH STOP DEPTH GR 10840.0 12846.0 ROP 10865 5 FET 11094 5 RPD 11094 5 RPM 11094 5 RPS 11094 5 RPX 11094 5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH GR 10840 0 10850 10843 5 10853 10848 0 10857 10854 5 10863 10857 0 10866 10858 0 10867 10859 5 10868 10862 0 10871 10865 0 10874 10868 0 10877 10890 0 10898 10894 5 10902 10896 5 10905 10897 5 10907 10899 0 10907 10901 0 10909 10903 0 10911 10905 0 10914 10908 0 10917 10910 0 10918 10912 0 10921 10915 0 10923 10916 5 10924 10922 5 10931 10923 5 10932 10927 0 10935 10933 0 10940 10937 0 10944 10940 0 10947 10944 0 10951 10946 0 10953 10948 5 10956 10961 5 10969 10964 0 10971 10972 5 10981 10974 0 10983 10977 5 10985 10980 0 10988 10983 5 10991 10985 5 10993 10990 0 10999 10993 5 11001 10998 0 11005 11002 0 11009 11004 5 11012 0 5 0 5 0 5 5 0 0 5 0 5 0 0 5 0 0 0 0 5 0 0 0 0 5 0 0 0 0 5 5 0 0 5 0 0 0 5 5 0 0 5 0 5 5 12884.5 12853.0 12853.0 12853.0 12853.0 12853.0 EQUIVALENT LTNSHIFTED DEPTH -- 11006 11009 11012 11017 11021 11029 11036 11040 11042 11047 11050 11057 11073 11076 11079 11086 11092 11094 11110 11143 11174 11177 11183 11291 11303 11499 11502 11504 11507 11508 11510 11513 11575 11580 11585 11625 11630 11634 11641 11647 11652 11662 11670 11676 11685 11709 11713 11722 11727 11764 11774 11780 11813 11823 11833 11837 11839 11014 11016 11019 11025 11029 11035 11044 11047 11049 11053 11056 11062 11079 11082 11085 11092 11097 11099 11117 11150 11182 11186 11189 11299 11309 11504 11508 11510 11514 11514 11516 11519 11582 11586 11591 11638 11643 11646 11652 11658 11665 11671 11681 11686 11696 11721 11723 11732 11737 11774 11780 11787 11820 11829 11845 11847 11850 11842 11849 11854 11858 11862 11869 11877 11894 11898 11899 11903 11904 11905 11910 11986 11990 11995 12000 12009 12037 12052 12060 12065 12110 12115 12121 12193 12216 12224 12225 12286 12292 12299 12311 12318 12339 12342 12389 12398 12407 12420 12427 12433 12435 12472 12476 12481 12508 12511 12514 12516 12524 12528 12533 12612 12615 12621 11853 11857 11862 11866 11869 11876 11884 11900 11903 11904 11907 11911 11912 11914 11995 11997 12001 12007 12017 12044 12062 12067 12071 12117 12123 12127 12200 12224 12229 12232 12299 12303 12310 12319 12325 12346 12349 12400 12407 12417 12429 12436 12442 12443 12478 12484 12488 12515 12518 12522 12525 12532 12536 12540 12621 12623 12629 12652 12657 12661 12707 12711 12721 12725 12728 12732 12734 12739 12748 12884 $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ REMARKS: 12660.5 12665.0 12668.0 12715 5 12718 5 12728 5 12732 5 12734 5 12740 0 12742 5 12747 5 12755 0 12891.5 BIT RUN NO MERGE TOP MERGE BASE 4 10875.0 11153.0 5 11153.0 12892.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 Name Min Max Mean DEPT 10840 12884.5 11862.2 ROP 4.9375 2009.48 90.9675 GR 20.213 739.883 64.5972 RPX 0.6379 22.9174 8.31286 RPS 0.7801 29.7792 9.74314 RPM 1.7829 29.7474 9.93069 RPD 1.8878 31.1807 10.5551 Nsam 4090 4039 4013 3518 3518 3518 3518 First Reading 10840 10865.5 10840 11094.5 11094.5 11094.5 11094.5 Last Reading 12884.5 12884.5 12846 12853 12853 12853 12853 FET 0.4105 29.7436 2.37679 3518 11094.5 12853 First Reading For Entire File .......... 10840 Last Reading For Entire File ........... 12884.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/05/25 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/05/25 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10850.0 11094.5 ROP 10875.0 11152.5 $ LOG HEADER DATA DATE LOGGED: 22-NOV-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 39.6 MAXIMUM ANGLE: 67.2 ISC 5.07 DEPII 2.22A, SP4 5.16,NGP 5.74 MEMORY 11153.0 10875.0 11153.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 TOOL NUMBER NGP SPC 194 6.000 6.0 FLOPRO 8.60 63.0 9.0 31000 16.0 .000 .000 .000 .000 46.9 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 4 API 4 1 68 4 2 ROP MWD 4 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10850 11152.5 11001.2 606 10850 GR 38.8087 739.883 152.623 490 10850 ROP 4.9375 1017.77 82.4773 556 10875 Last Reading 11152.5 11094.5 11152.5 First Reading For Entire File .......... 10850 Last Reading For Entire File ........... 11152.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/05/25 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/05/25 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 P_AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11095 0 12853.0 FET 11099 5 12860.0 RPD 11099 5 12860.0 RPM 11099 5 12860.0 RPS 11099 5 12860.0 RPX 11099 5 12860.0 ROP 11153 0 12891.5 $ LOG HEADER DATA DATE LOGGED: 27-NOV-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNHOLE SOFTWARE VERSION: DEPII 2.22A, SP4 5.16,NGP 5.74 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT) : 12892.0 TOP LOG INTERVAL (FT) : 11153.0 BOTTOM LOG INTERVAL (FT) : 12892.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPER3kTURE (DEGF) MUD AT MEASURED TEMPERATLrRE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTR3kTE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): REM_ARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 70.3 102.6 TOOL NI/MBER Pl130GR4 Pl130GR4 6.000 6.0 FLOPRO 8.80 49.0 8.5 29000 7.4 .140 .079 .160 .100 51.7 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 5 API 4 1 68 4 2 RPX MWD 5 OHMM 4 1 68 8 3 RPS MWD 5 OHMM 4 1 68 12 4 RPM MWD 5 OHMM 4 1 68 16 5 RPD MWD 5 OHMM 4 1 68 20 6 ROP MWD 5 FT/H 4 1 68 FET MWD 5 HOUR 4 1 68 24 7 28 8 Name Min Max Mean Nsam DEPT 11095 12891.5 11993.2 3594 GR 20.213 196.862 52.1816 3517 RPX 0.6379 22.9174 8.28041 3522 RPS 0.7801 29.7792 9.71625 3522 RPM 1.7487 29.7474 9.90294 3522 RPD 1.8082 31.1807 10.5284 3522 ROP 6.3013 2009.48 92.489 3478 FET 0.4105 29.7436 2.4548 3522 First Last Reading Reading 11095 12891.5 11095 12853 11099.5 12860 11099.5 12860 11099.5 12860 11099.5 12860 11153 12891.5 11099.5 12860 First Reading For Entire File .......... 11095 Last Reading For Entire File ........... 12891.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/05/25 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 99/05/25 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 99/05/25 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Physical EOF End Of LIS File