Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout198-192
" "
Pages NOT Scanned in this Well History File
XHVZE
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
(9ç¡ - 17;) File Number of Well History File
PAGES TO DELETE
Complete
RESCAN
o Color items - Pages:
Grayscale, halftones, pictures, graphs, charts -
Pages:
o Poor Quality Original - Pages:
o Other - Pages:
DIGITAL DATA
o Diskettes, No.
o Other, NolType
OVERSIZED
o
Logs of various kinds
o
Other
COMMENTS:
I Cs 1'-Q~
Scanned by: Beverty Mildred Daretha ath Lowell
Date: ,)./15 Is! ~
o TO RE-SCAN
Notes:
Re-Scanned by: Beverly Mildred Daretha Nathan Lowell
Date:
/5/
. STATE OF ALASKA .
ALAS~IL AND GAS CONSERVATION COM",,",SSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status:D Oil DGas D Plugged 1&1 Abandoned D Suspended DWAG 1 b. Well Class:
20AAC 25.105 20AAC 25.110 1&1 Development D Exploratory
DGINJ DWINJ D WDSPL No. of Completions Zero Other D Stratigraphic D Service
2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 3/31/2006 198-192 306-053
3. Address: 6. Date Spudded 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 09/27/1998 50- 029-22923-00-00
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number:
Surface: 10/19/1998 PBU P2-11
l' FSL, 1115' FWL, SEC. 11, T12N, R14E, UM 8. KB Elevation (ft): 15. Field 1 Pool(s):
Top of Productive Horizon:
1103' FNL, 317' FWL, SEC. 18, T12N, R15E, UM 49.8 Prudhoe Bay Field 1 Point McintyrE
Pool
Total Depth: 9. Plug Back Depth (MD+ TVD)
860' FNL, 651' FWL, SEC. 18, T12N, R15E, UM 15157 + 8983 Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation:
Surface: x- 681351 y- 5998580 Zone- ASP4 15203 + 8991 Ft ADL 034627
TPI: x- 691137 y- 5997719 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit:
Total Depth: x- 691465 y- 5997971 Zone- ASP4 N/A MD
18. Directional Survey 19. Water depth, if offshore 20. Thickness of Permafrost
DYes 181 No N/A MSL 1800' (Approx.)
21. Logs Run:
MWD, Gyro, LWD, GR 1 RES
22. .."ASiNG, LINER AND CEMENTING RECORD
··Fi····T~~J~~i.V.... ........ Å''- fi i)aryH~[j ···~ETTIN@·)E:f!'fti.1'\ÍQ f..ti"\ioc··i Ii ....:... . ,"-V.i'. .>i·/Ciii(!T;N;!'cd.i~
.i.<, \J\I+ O~!';F'¡'0' I·......··".,...~·i '.10 p... iI:S01'TOM ToP' Bo+r:OM SIZli··.·· . ...
20" 133# H-40 40' 118' 40' 118' 30" Driven
9-5/8" 40# L-80 38' 5742' 38' 4970' 12-1/4" 1295 sx PF 'E', 470 sx Class 'G'
7" 26# 1 29# L-80 113Cr 36' 14654' 36' 8937' 8-3/4 " 290 sx Class 'G'
4-1/2" 12.6# 13Cr 14412' 15199' 8827' 8991' 8-3/4" 120 sx Class 'G'
23. Perforations open to Production (MD + TVD of Top and 124;/x ..fi·... fF·· . if" ..... i ........(!. (xN..T...N!.iiX..f...i..·...·.·.·. .··.i····
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
None 3-1/2",9.2#,13Cr 14439' 14391'
MD TVD MD TVD
[~5r..i·x.·..·. f.CiC..i. .·.i ii ··..X·.f.X.;iiii! .i··.··
·i····i ....... .....;......7;.. .. 'ii.·X
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
~C~\J:'4EfJ ''';.1; 15077' Set Whipstock
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
Not on Production N/A
Date of Test Hours Tested PRODUCTION FOR OIL-BSL GAs-McF W A TER-BsL CHOKE SIZE GAS-OIL RATIO
TEST PERIOD ..
Flow Tubing Casing Pressure CALCULATED .. OIL-BSL GAs-McF W A TER-BsL OIL GRAVITY-API (CORR)
Press. 24-HoUR RATE
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None RBDMS BFL MA V 2 2 2006
....... . i, I 1\ ,
Form 10-407 Revised 12/2003 UKt \ r.L I
Î ED ON REVERSE SIDE
... .-
G
28.
GEOLOGIC MARKER
29.
ORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Kuparuk Zone LC3
14710'
8957'
None
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble -rô) Title Technical Assistant
Date 05/1 B/oCp
PBU P2-11
Well Number
198-192 306-053
Permit NO.1 Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
Prepared By Name/Number:
Drilling Engineer:
Terrie Hubble, 564-4628
Barbara Lasley, 564-5126
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
e
e
P2-11A
Prudhoe Bay Unit
50-029-22923-01
206-026
Accept:
Spud:
Release:
Ri:
PRE-RIG WORK
02127/06
MU BOT MHA WIPDM AND 2.70" MILL. DISPLACE 60/40 FROM COIL AT SURFACE AND RIH MILLING TO
15148' WITH NO MOTOR WORK, POOH INSPECT 2.70" MILL, LOOKS ALMOST NEW. MU BOT UR TO MHA,
RIH TO FLAG AND CONFIRM DEPTHS, OK. DISPLACED COIL AND START UR FROM 14,460' TO 14,610 AND
THEN DIVERT TO TANKS DUE TO PROBLEMS AT GC.
02128/06
GET WELL LINED OUT TO TANKS AND CONTINUE UNDER REAMING TO 15,125'. GET WELL LINED OUT TO
GC, CONTINUE UNDER REAMING TO 15,148' AND START TO SET DOWN. WORK INTERVAL ACROSS WS
SETTING DEPTH FROM 15,145' - 15,050' WHILE PUMPING 1 % XS KCL AND FLO PRO SWEEPS. PUMP
FINAL FLO PRO SWEEP OFF BOTTOM AT 15,144' CTM AND CIRCULATE OUT WHILE FLOWING THE WELL
ON AIL AND POOH. MU BOT 2.70" WS DRIFT AND RIH. START TAGGING COLLARS AT 14,708', -14,740',
14,784', -14,823' CTM. CAN WORK THROUGH UNTIL 14,938'. SI AIL AND WELL AND STILL CAN NOT GET
PAST 14,938' LOOKS LIKE FILL. CLEAN OUT TO 15,144' CTM WITH FLO PRO SWEEPS AND 1% XS KCL.
DID NOT HAVE ANY TROUBLE JETTING TO BOTTOM WITH FLO PRO SWEEPS AND DID NOT SEE
SIGNIFICANT FILL. PUMP FINAL SWEEP AND CHASE TO TT, HAVE MINOR PROBLEMS IN NIPPLES BUT
REDUCED PUMP RATE AND WORKED THROUGH. RE-DRIFT AT MIN RATE FROM 14,350' CTM. TO 15,144'
AND DID NOT SEE ANY PROBLEM.
03/01106
PUH AND GET HUNG UP AT GLM AT 14430' BUT GET THROUGH. TRY TO RBIH AND CANNOT WORK PAST
MANDREL. TRIED DIFFERENT SPEEDS, PUMPING AT HIGH AND MIN RATES WITHOUT SUCCESS. POOH
AND MAKE SHORT TRIP ACROSS MANDREL AT 13,304' CTM AND TAG UP ON FIRST ATTEMPT TO GO
DOWN PAST. MADE SECOND SHORT TRIP ACROSS MANDREL WITHOUT PROBLEM. SAW BOBBLE
COMING UP THROUGH GLM AT 9852', RBIH WITHOUT PROBLEM. CONTINUE POOH. AT SURFACE,
INSPECT TOOLS, NO OBVIOUS MARKS. CHANGE OUT NOZZLE TO 2.68" 00 AND RBIH TO 14,551' CTM, -
100' BELOW TT. POOH. BLOW DOWN IA TO GC, FP FLOWLINE, AND POP OFF WELL.
03/02106
FIND CRACK IN COIL AT DIMPLE IN CONNECTOR. CUT 100' OF PIPE, MU NEW CONNECTOR AND RIH
WIBOT TEL WIIBP. RIH TO 5564' AND START TO SEE DRAG. WHP TRACKING COIL MOVEMENTS. WORK
DOWN TO 5704' CTM AND PLUG APPEARS TO BE DRAGGING. POOH.
03/03/06
RDMO - RIG 7 ES MOVING ONTO ADJACENT WELL. JOB INCOMPLETE. NOTE: INSPECTION OF IBP
SHOWED SIGNIFICANT AMOUNTS OF METAL SHAVINGS. THESE SHAVINGS WERE STUCK TO THE TOOL
STRING AND COULD BE RESPONSIBLE FOR THE PROBLEMS ENCOUNTERED WHILE RIH.
03/05/06
DRIFTED WI 2.50 CENT AND SAMPLE BAILER, SAT DOWN AT 5057' AND 5945', BUT WAS ABLE TO CLEAN
UP AND DRIFTTHRU WIO ANY PROBLEMS, STOPPED DUE TO DEVIATION AT 14,699' SLM, SAMPLE OF
METAL SHAVINGS IN BAILER, OVER PULLED 400-500# FROM 5700' UP TO 5400', DRIFTED WI 2.50 DMY
GUN, UNABLE TO GET PAST 5789' SLM.
03/06/06
DRIFTED WI 2.50 CENT AND 10' 2.25 DO BAILER, SAT DOWN AT 5800' WORKED PAST, DRIFT OUT TT TO
14,500' SLM, BAILER FULL OF METAL SHAVINGS, BRUSH AND FLUSH TUBING WI 2.50 CENT AND 31/2"
BLB, DRIFTED WI 2.50 CENT AND 10' 2.25 D.DOWN BAILER (136" OAL) TO 14,600' SLM, NO PROBLEMS WI
DRIFT AFTER B/F. RDMO.
P2-11A, Pre-Sidetrack Work
Page 2
e
e
03/13/06
DEPTH CORRELATED TO TUBING SUMMARY DATED 26-0CT-1998. IBP SET AT 14,420'. SLACKED ONTO
IBP - GOOD. BOTTOM NOT TAGGED. WELL LEFT SI. BRIDGE PLUG IS BAKER 2.125" IBP, 2 SEALING
ELEMENTS, 1.375" 00 FISHING NECK, TOTAL LENGTH 11.05'
03/14/06
TIIIO = 680/230NAC. TEMP = SI. TBG AND IA FL (PRE MIT-T, CMIT-TXIA AND MIT-OA). TBG FL AT 225' (4
BBLS). IA FL AT 5838' (103 BBLS). OA FL NEAR SURFACE.
TIIIO= 680/225/0 TEMP= SI (PRE RWO) MIT T PASSED TO 3000 PSI. PUMPED 4 BBLS CRUDE TO
PRESSURE UP TO 3000 PSI. 2ND TEST RESULTS-1ST 15 MIN TEST LOST 50 PSI, 2ND 15 MIN TEST LOST
20 PSI. CMIT TXIA TO 3000 PSI.
03/15/06
T/IIO= 100/15010 TEMP= SI (PRE RWO) CMIT TXIA PASSED TO 3000 PSI. PRESSURED TBG/IA TO
3000/3100 PSI WITH 355 BBLS CRUDE. 1ST TEST FAILED. 2ND TEST RESULTS-1ST 15 MIN LOST 10 PSI
ON TBG, 10 PSI ON IA. 2ND 15 MIN LOST 20 PSI ON TBG, 30 PSI ON lA, TEST PASSED. MIT OA PASSED
TO 2000 PSI. LOST 20PSI1ST 15MIN, LOST 20PSI2ND 15 MIN, FOR A TOTAL OF 40PSI. BLED TO ZERO.
FWHP'S = 175/75/0
03/19/06
PULLING IBP AT14378' SLM.
03/20/06
CONTINUE PULLING IBP, IBP OUT OF HOLE. ELEMENTS PEELED BACK, BUT ALL RECOVERED W/ IBP.
RDMO. WELL LEFT SHUT IN - DSO NOTIFIED OF CONDITION.
,
BP EXPLORATION Page 1 ...
Operations Summary Report
Legal Well Name: P2-11
Common Well Name: P2-11 Spud Date:
Event Name: REENTER+COMPLETE Start: 3/28/2006 End: 4/24/2006
Contractor Name: NORDIC CALISTA Rig Release: 4/24/2006
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
3/28/2006 06:00 - 06:30 0.50 MOB P PRE Wait on crew change and security to begin move off of DS 7.
06:30 - 07:00 0.50 MOB P PRE Pre rig move safety meeting with rig crew, TP, TL, WSL and
security. Discuss route of move, proceedures, hazards and
mitigations.
07:00 - 07:15 0.25 MOB P PRE Jack up rig and prepare for move to PM2.
07:15 - 14:00 6.75 MOB P PRE Begin rig move. Depart DS 7 headed down oxbow road toward
Pt. Mac #2.
14:00 - 22:00 8.00 MOB P PRE Stage rig on PT Mac #2 pad. Wait for well to be loaded and
killed with LRS pumping unit. Injection rate at 3000 psi was 1.5
bpm. 220 bbls total were pumped during well kill. ISITP: 1650
psi. Final SITP: 220 psi.
22:00 - 23:00 1.00 MOB P PRE PJSM with crew and DSM. Shut in adjacent flowing wells.
Spot herculite and rig mats around tree. MI and spot rig over
well.
Accept rig at 2300 hrs on 3/28/2006
23:00 - 00:00 1.00 MOB P PRE Install berm around cellar. Seal cellar bottom. Spot cuttings
box and misc equipment. Spot camps.
3/29/2006 00:00 - 02:00 2.00 BOPSUF P PRE Complete prep work in cellar. NU BOPs and riser.
02:00 - 06:20 4.33 BOPSUF P PRE Test BOP equipment. Witness waived by AOGCC.
06:20 - 07:10 0.83 BOPSUF P PRE SD operations for crew change and pre tour meeting.
07:10 - 08:00 0.83 BOPSUF P PRE Continue with BOP test. Test completed ok at 08:00. Witness
waived by AOGCC, Jeff Jones.
08:00 - 08:45 0.75 CLEAN P WEXIT Rig up hydraulic control lines from rig ESD controls to adjacent
wells 10 and 12 with the assistance of pad operator and DSM.
Also check that our rig accumulator panel is capable of
5000-5500 psi to ensure that SSSV will remain open.
08:45 - 09:00 0.25 CLEAN P WEXIT PJSM Re: Stabbing pipe and reheading.
09:00 - 10:00 1.00 CLEAN P WEXIT Pull pipe over and stab in injector.
10:00 - 12:30 2.50 CLEAN P WEXIT Build BHI CTC and UQC. Meg line. Line failed insulation
check.
12:30 - 14:30 2.00 CLEAN N SFAL WEXIT Check out cable and associated eq. Found damaged jupiter
plug in reel house. Change out for replacement plug. Check
line again. Checks ok.
14:30 -15:45 1.25 CLEAN P WEXIT Pump 15 bbls methanol, follow by 9.6 ppg brine from pits.
Load coil with fluid. Taking returns to tiger tank. Pumping at a
low rate to avoid damaging cable umbilical.
15:45 - 17:00 1.25 CLEAN P WEXIT Pre spud meeting followed by weekly safety meeting.
Meetings held on tour while circulating to load coil with fluid,
and off the critical path.
17:00 - 17:10 0.17 CLEAN P WEXIT Continue circulating to the pits while blowing down the hardline
to the tiger tank.
17:10 - 17:30 0.33 CLEAN P WEXIT Rig up BHA #1 to RIH with a nozzle and killlcleanout well.
17:30 - 19:00 1.50 CLEAN P WEXIT RIH with BHA #1: 2.25" JSN-Stinger bar-XIO-UQC-CTC.
Taking gas cut returns to tiger tank.
19:00 - 20:00 1.00 CLEAN P WEXIT Hold TL mtg and weekly safety mtg in Ops cab while RIH.
20:00 - 21 :30 1.50 CLEAN P WEXIT COntinue to RIH. Shut in well and allow WHP to build.
21 :30 - 23:30 2.00 CLEAN P WEXIT Circ well at 1.98 bpm @ 3570 psi. Hold 250 psi WHP. Get
several btms up. Take gas bubbles outside.
23:30 - 00:00 0.50 CLEAN P WEXIT Begin displacement to 9.6 flo pro.
3/3012006 00:00 - 03:00 3.00 CLEAN P WEXIT Displace well to 9.6 flo pro while pulling out of hole.
03:00 - 04:00 1.00 CLEAN P WEXIT At surface. Get off well. Unstab coil. MU Baker dummy WS
e
Printed: 5/112006 1:31:22 PM
BP EXPLORATION Page 2 ..,
Operations Summary Report
Legal Well Name: P2-11
Common Well Name: P2-11 Spud Date:
Event Name: REENTER+COMPLETE Start: 3/28/2006 End: 4/24/2006
Contractor Name: NORDIC CALISTA Rig Release: 4/24/2006
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
3/30/2006 03:00 - 04:00 1.00 CLEAN P WEXIT on Inteq MWD tools.
Stab coil. Test mwd tools. Get on well.
04:00 - 06:00 2.00 CLEAN P WEXIT Run in hole.
06:00 - 07:35 1.58 CLEAN P WEXIT Crew changeout and pre tour TL meeting. Held on tour, but off
the critical path while we RIH.
07:35 - 09:45 2.17 CLEAN P WEXIT Pumps at 0.5 bpm. Log tie in pass over GR charecter at
14625', and down to 15156'. Started taking wt at 15156'. Note
- Service coil cleanout made to 15144', CTM. GR tie in ok, but
not great. Significant shift from PDC log due to the presence of
Barium scale.
09:45 - 10:30 0.75 CLEAN P WEXIT Pumps at 0.5 bpm. Log tie in pass down for CCL to confirm we
are on depth. Log from above tubing tail to 15156'. Set down
at 14123', picked up and fell right thru. This is probably the XN
nipple at 14127'.
10:30 - 12:30 2.00 CLEAN N SFAL WEXIT BHI CCL log is bad. and we can't confirm our tie in at the
tubing tail. There may be a problem with the GR log generated
previously. Take the time to attempt to sort out the problem. It
is very important, especially with the radioactive scale in this
well that we get a tie in log we can have confidence in. Allow
MWD and DD to sort out the problem.
12:30 - 14:55 2.42 CLEAN N SFAL WEXIT BHI MWD hand unable to resolve issue. Can not get a CCL
log, and have concerns about the validity of the GR log. MWD
hand suspects a software problem and needs to consult with
people in Houston. Yo-yo'd and circulated at max rate while
BHI figures out software. Went up and down 5 times thru XN
nipple while pumping at full rate. Didn't see any hang ups, but
did get a low but significant amount of additional fine material
out of the hole.
14:55 - 15:30 0.58 CLEAN N SFAL WEXIT BHI confirms problem is a software problem. CCL is definatly
bad. Suggests that GR should be ok due to its slower logging
speed. Make an additional logging repeat pass with GR to
confirm that it agrees with first log.
15:30 - 18:15 2.75 CLEAN P WEXIT The repeat logging pass confirms that the BHI GR data is
repeatable. POOH to pick up the whipstock.
18:15 - 19:00 0.75 CLEAN P WEXIT At surface. Flow check well. Hold TL mtg and PJSM to
discuss BHA. Get off well. Unstab coil. LD dummy WS.
19:00 - 19:45 0.75 STWHIP P WEXIT MU Baker WS on Inteq mwd tools. Stab coil. Test mwd.
19:45 - 23:00 3.25 STWHIP P WEXIT Get on well. Run in hole.
23:00 - 00:00 1.00 STWHIP P WEXIT Log gr tie in from 14550' to 14650'. Subtract 10'.
3/31/2006 00:00 - 00:30 0.50 STWHIP P WEXIT Log second down pass from 15080' to 15090'.
00:30 - 01:00 0.50 STWHIP P WEXIT RIH to 15089.1'. PU to up to 30k# string wt. Orient to low side
TF. Close EDC and pressure coil to 1500 psi. Pressure to
2000 psi. Press to 2500 psi. Tol sheared and coil pressure
dropped to 1650 psi.
WS top: 15077'. WS btm: 15089'.
01:00 - 03:45 2.75 STWHIP P WEXIT POOH circulating at min rate.
03:45 - 05:00 1.25 STWHIP P WEXIT Stop at 150'. Flow check. Get off well. Continue to POOH
and inspect coil for wear. LD BAker setting tool. MU window
milling assembly. Stab coil. Test mwd. Get on well.
05:00 - 06:15 1.25 STWHIP P WEXIT Run in hole.
06:15 - 08:15 2.00 STWHIP P WEXIT Crew change and pre tour technical limits meeting.
08:15 - 09:30 1.25 STWHIP P WEXIT Log tie in pass over GR charecter at 14600'. Make -22'
correction.
Printed: 51112006 1 :31 :22 PM
';¡
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
BP EXPLORATION
Operations Summary Report
Page 3 ..
P2-11
P2-11
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 3/28/2006
Rig Release: 4/24/2006
Rig Number:
Spud Date:
End: 4/24/2006
Description of Operations
3/31/2006
09:30 - 17:30
From - To Hours Task Code NPT Phase
8.00 STWHIP P
WEXIT Dry tag at top of whipstock. Pick up, kick pumps on tag at
15076.6'. Begin milling window. Apparently through casing.
WEXIT Drill 10' of rat hole. 4130 psi @ 1.32 in/out. Make two up and
down ream passes. Dry drift. Window smooth.
WEXIT Pull out of hole. Stop and try to get UTIM working. Concerned
about coil life management in chrome tbg. Unable to cut coil
due to length required for proposed TD. Stop at 100'. Get off
well. Inspect 100' coil above connector. Pipe weár is minimal.
WEXIT Unstab coil. LD BHA.
PROD1 Continue to LD milling BHA. Pick up orienter. Make up HYC
bi-center bit. Stab coil. Test mwd. Get on well.
Run in hole.
Log gr tie in from 14,580'. Subtract 34.5' correction.
Run in hole to window. Pass through window smoothly.
ril ahead rom 095'. psi sat 1. 5 bpm In .4 out.
Drill ahead from 15099'. PVT=402 bbls. Drilling at
1.40/1.26/3933 psi. IAP=454 psi, OAP=229 psi. WOB=
Ibs. BHP=5647 psi. Drilling slow at first, but improve fter
10'. Out micro motion is not reading correctly. 2 urs into the
tour PVT = 403 bbls. No fluid losses occurin
PROD1 Stop at 15150'. Make wiper up to window, en back to TD to
clean hole. POOH open EDC above w ow and POOH
pumping at full rate to clean hole. problems at the window.
PROD1 PJSM with rig hands, BHI, BHI . ItOrs and WSL. Discuss
hazards and plan forward fo HA swap.
PROD1 Break off injector at 100' OH inspecting coil visually and with
SWS UTIM. No pro ms found. Blow down BHA. Lay down
bit and motor. L aown MWD tool. Hook up rib steer motor
on catwalk a check it electrically. Pick up rib steer BHA.
PROD1 RIH with A #6, Rib Steer motor plus Res tool. Running a
log bit.
L e in pass down from 14580'.
xperiencing software problems with coil track. Reciprocate in
liner while working on problem.
Unable to work through window with ribsteer BHA. Make
several attempts at different speeds and circulating at min rate.
et down with the bit at 15085' each time.
Pul t of hole for orienter, string reamer, and window mill.
LD ribs r tools. MU 0.8 deg Inteq motor with orienter, string
reamer, an iamond speed mill. Stab coil. Test mwd. Get on
well.
DPRB PROD1 Run in hole.
DPRB PROD1 Log gr tie in from 14, '. Subtract 47' correction. Log RA tag
to verify depth.
DPRB PROD1 Hold pre tour TLM meeting
WSL.
DPRB PROD1 Begin reaming window. Plan to ma a reaming pass every 30
degrees completely around the clock.
17:30 - 19:45
19:45 - 23:45
4/1/2006
23:45 - 00:00
00:00 - 01 :00
01:00 - 04:15
04:15 - 04:45
04:45 - 05:00
12:05 - 14:30
14:30 - 17:45
17:45 - 19:00
19:00 - 20:15
20:15 - 20:45
4/212006
20:45 - 00:00
00:00 - 01:15
01:15 - 04:30
05:30 - 06:00
06:00 - 07:00
2.25 STWHIP P
4.00 STWHIP P
0.25 STWHIP P
1.00 DRILL P
3.25 DRILL P
0.50 DRILL P
0.25 DRILL P
3.42 DRILL P
P
P
3.25 DRILL
1.25 DRILL P
1.25 DRILL N
0.50 DRILL N
3.25 DRILL
1.25 DRILL
N
N
m initial
window milling. Rib steer BHA is 2.68" OD at the r rig 7'
behind the bid. The diameter as measured at the ribs s
2.71". The ribs have some sacraficial hard facing on the
Printed: 5/1/2006 1 :31 :22 PM
e
e
rm..n..I
IUI
\.::::...I
FRANK H. MURKOWSKI, GOVERNOR
AT,ASIiA. OIL AND GAS
CONSERVATION COMMISSION
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Barb Lasley
CT Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
\~l&~ ,qð"
Re: Prudhoe Bay Field, PBU P2-11
Sundry Number: 306-053
~ÇA~ffWE:l¡ r
.-
:j);
Dear Mr. Lasley:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
DATED thisd day of February, 2006
Encl.
I¡.J 4'" Zl /fl ZoOID
e STATE OF ALASKA ~1-14-¡)Þ RSCEJVED
ALASKA OIL AND GAS CONSERVATION COMMISSION 07"1 fltl4';
APPLICATION FOR SUNDRY APPROVAL 2006
20 AAC 25.280 ~8ska Oil & Gas Cons. Commission
Anchnrana
1. Type of Request: III Abandon / 0 Suspend 0 Operation Shutdown 0 Perforate 0 Other _______________
o Alter Casing 0 Repair Well 0 Plug Perforations 0 Stimulate 0 Re-Enter Suspended Well
o Change Approved Program 0 Pull Tubing 0 Perforate New Pool 0 Waiver 0 Time Extension
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska
7. KB Elevation (ft):
4. Current Well Class: <'
181 Development 0 Exploratory
o Stratigraphic 0 Service
5. Permit To Drill Number
198-192 ,/
6. API Number: /
50- 029-22923-00-00
99519-6612
11.
Total Depth MD (ft):
15203
Casing
9. Well Name and Number:
PBU P2·11 ,/
10. Field / Pool(s):
Prudhoe Bay Field / Point Mcintyre Pool
PRESENT WELL CONDITION SUMMARY
Total Depth TVD (ft): \ Effective Depth MD (ft): Effective Depth TVD (ft):
8991 15157 8983
Length Size MD / TVD
49.8
8. Property Designation:
ADL 034627
Plugs (measured):
None
Burst
Junk (measured):
None
Collapse
78' 20" 118' 118'
5704' 9-5/8" 5742' 4970' 5750 3090
14618' 7" 14654' 8937' 7240 5410
Liner 787' 4-1/2" 14412' - 15199' 8827' - 8991' 8430 7500
Perforation Depth MD (" I Perforation Depth TVD (ft): I
14915' - 15140' 8966' - 8979'
Packers and SSSV Type: 7" x 4-1/2" Baker 'S-3' Packer;
TRSSSV, HES Series 10
Tubing Size:
3-1/2",9.2#
/
Tubing Grade: I Tubing MD (ft):
13Cr 14439'
Packers and SSSV MD (ft): 14391'; ./
2195'
12. Attachments:
181 Description Summary of Proposal
o Detailed Operations Program
14. Estimated Date for
Commencing Operations:
o BOP Sketch
13. Well Class after proposed work: ,/
o Exploratory 181 Development 0 Service
16. Verbal Approval:
Commission· Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Na~ Barb Lasley Title CT Drilling Engineer
Signature !/ - /-..- tiJ1~t?.L Phone 564-5126
U C/ Commission Use Only
February 20, 2006
Date:
/
15. Well Status after proposed work:
o Oil o Gas
o WAG 0 GINJ
o Plugged
DWINJ
181 Abandoned
o WDSPL
Contact Barbara Lasley, 564-5126
,-,/"/
Date ''1' fl £I (.p
.
Prepared By Name/Number:
Terrie Hubble, 564-4628
Conditions of approval: Notify Commission so that a representative may witness
I Sundry Number: 30 ~ - 05 '3
o Plug Integrity
o BOP Test
o Mechanical Integrity Test
o Location Clearance
~:~",ndf;407.
(( J)'-4¿Á
Approved By -/1 /V Y I
Form 10-403 R ~ed om ~
n
Ie i
RBDMS 8Ft F E8! 5 7006
COMMISSIONER
APPROVED BY
THE COMMISSION
Date ~-/4-ð6
! ¡ r
Submit In Duplicate
e
e
To: Winton Aubert, Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Barbara M. Lasley, CTD Engineer
Date: February 8, 2006
Re: Prep P2-11A for CTD sidetrack
Obp
Sundry approval is requested to prepare P2-11A for a sidetrack. The proposed sidetrack for P2-11A is a ./
part of the overall development plan for the east area of Pt McIntyre.
P2-11, drilled in 1998, targeted a pinch-out on the eastern periphery of the field. Production declined, after
multiple attempts to add rate through adperfs, success was realized in 2000 with an adperf and scale
inhibition job. By 2001, the well had been shut-in until 2004 when it was returned to full-time production
as part of the Waterwheel project and is being produced to the LP system at GC 1.
The objective of the sidetrack is to improve sweep and increase recovery in the eastern periphery of the Pt.
McIntyre field. The well is expected to add new reserves since it will be located east of all current ~
Kuparuk production and injection wells in the area. The well will target a relatively thin oil column, and is
therefore designed as a long lateral drilled as close to the top of the Kuparuk as possible.
Pre- Hie Work Summary:
Note: Do not put the well back on production after coil cleanouts are made. The
well should remain SI until after the ST is completed.
1. AC-LDS; AC-PPPOT-IC, AC-PPPOT-T.
a. Note: All of the previous tests passed 2/11/05, problems are not anticipated.
2. Drift / Clean out tubing with 2.80" mill and motor to the top of the XN at 14427' ,/
a. Do not mill out XN. POH
b. Pick up a Baker 2-5/8" underreamer with 3.75" blades.
c. Underream liner to 15,150' POH.
d. Make up a dummy whipstock BHA and run to 15150' MD.
3. Set XN plug in nipple. If slickline cannot set the plug, set an ffiP just above XN using e-line. /
4. MIT-T, lA, and OA.
Do not proceed if the MIT -Tor IA fails. Further evaluation work mav have to be performed
5. Pull plug.
6. Install accumulator for TRSSSV.
7. Bleed gas lift and production flowlines down to zero and blind flange /
8. Remove wellhouse, level pad
The pre CTD work is slated to begin on February 20,2006.
. T~~ ~D - ¥ 3 ~ f t"<\-V A.-( .
Hie Work:
1. MIRU and test BOPE to 250 psi low and 3500 psi high.
2. Mill 2.74" window at 15,100' and 10' of openhole.
3. Swap the well to 9.6 ppg Ao-Pro.
4. Drill 3" OH with resistivity at minimum DLS. Target TD is 19,000' MD.
5. Run 2 3/8" 13Cr solid/slotted liner Banzai completion leaving TOL at 14,420' MD.
6. Pump primary cement job for Banzai completion to TOL, 21 bbl of 15.8 ppg expansive liner
cement is planned.
7. Cleanout run to mill baffle plate and float.
e
e
8. Conduct MCNUGR/CCL log
9. Test liner lap to 2000 psi.
10. Freeze protect well, RDMO
Post-Hie Work
1. Install well house. Hook up flow line.
2. Completion planned for -1000' of slotted liner.-
3. SBHPS post initial cleanup.
Barbara M. Lasley
CTD Drilling Engineer
564-5126
ðJ~y-
CC: Well File
Sondra Stewman/ferrie Hubble
e
1REE= 4-1/16' 5MCHROME
WB.U·EAO = FMC
ACTUATOR = BAKæC
KB. B.EV = 49.8'
BF. B.EV =
KOP=
Max An
Datum M) =
DatumTVO-
1381'
91 @ 14784'
14462'
8800' 55
9-518' CSG, 40#, L-80, D = 8.835'
Minimum ID = 2,75" 014427'
3-112" HES XN NIPPLE
7' CSG, 26#, L-80, D = 6.276' H 13662'
TOP OF 4-112' Ltfl
3-1I2'1BG, 9.2#, 13CR, .0087 bpf, D= 2.992'
e
P2-11 /
SAFElY NOTES: HOIIZONT AL WB.L
MCHROMECSG, LNR .. TBGM
.
2195' 1RSSSV,I-ESSERIES 10,10=2.81'
GAS LFT MANDRB.S
ST M) TVD DEV TYPE VLV LATCH PORT DATE
1 4262 4061 50 M\1G-5 RK
2 5838 5024 57 M\1G-5 RK
3 8047 6013 64 M\1G-5 AI<
4 9874 6824 64 M\1G-5 RK
5 11883 7709 62 M\1G-5 RK
6 13274 8318 64 M\1G-5 RK
7 14330 8790 63 M\1G-5 RK
14391'
7' X 4-1/2' BAKæ 5-3 R<A, D = 3_875'
14416'
3-112' I-ES X NIP, ID = 2.813'
14427'
3-112' HES XN NIP, D = 2_75'
14438' 3-112' WLEG, D = 3.000'
14425' H B.MHTLOGGED10130199 I
7' CSG, 29#, 13CR. D=6.184'
PIJIFORA TDN SUMMARY
REF LOG:SPffiRY LWO ON 10120198
ANGLE AT TOP PERF: 89 @ 14915'
Note: ReIer to Production DB lor historical perf data
SIZE SPF NTERl/AL nISqz DATE
2' 6 14915 - 14975 0 04117/00
2-314' 4 15000 - 15088 0 10125/98
2-1/2' 6 15000 - 15036 0 11105/99
2-1/2' 6 15036 - 15088 0 11104199
2' 6 15100 - 15140 0 05130100
4-1/2' LIIfI, 12.6#, 13CR. .0152 bpI, D= 3.958'
DATE
10/28/98
12/21/98
12/21/98
09/15101
10/18105
11105105
COMMENTS
OfIGINAL COMPLETION
MLL TlGt-rr COLLARS POST
RIG. (LAST RUN 2.805' ULL)
CORRECTIONS
P8'IF CORAECTONS
WH CORRECTDN
DATE
REV BY
FIIVTP
WRlPJC
CM'TLH
REV BY
~
POINT MCINTYRE UNrr
WB.L: P2-11
PERMIT No: ~ 981920
API No: 50-029-22923-00
sa:: 11 T12N R14E4147.16 Fa. 857.43 FIlL
BP Exploration (Alaaka)
PORT DAlE
Minimum ID ::::
3-112" HES XN
7" X 4-112" BAKER $-3 PKf1, II) ~ 3,875"
14416'
3-112" 1-£8 X NIP, II) ~ 2,813"
3-112"1-£8 XNNIP,II)~ 2.75"
3,1/2" TBG, 9.2#, 13CR, 0.0087 bpf, 1I)~2_992"
POINT M::INTY fIE UNIT
WB..L: 1'2-11
PERMIT No; 1981920
API No: 50-029-22923-00
SEe 11 T12NR14E4147.18 ÆL857.43 FNL
BP Exploration (Alaska)
a
I
PRUDHOE BAY, PTMCINiYRE OIL
PBUYT_MAC_P2
PRUDHOE BAY
100
50
10
5
0.5
0.1
1"2-11
Oil Rate (CD) (Mbbl/d )
- \/\later Rate (CD) ( Mbbl/d )
Gas Rate (CD) ( MMcf/d )
Cum Oil Prod (MMbbl )
Gas I Oil Ratio ( Mcf/bbl )
\/\IaterCut(%)
0.05
0.01
1998
99
2000
01
02
03
04
05
Date
10
o
1EO
:m
Qrn 01 At:d, M::ti
4ffJ
60J
EO
1axJ
"0
""
1$6OJ
Ô
!l.
.2!
It!
cr:
ð
100
A1ase
Case Nare
b
Dí
Q
ti
te
Erd Råe
Final Råe
Qm ROO . 481.371 M::ti
Qm Dåe . 12/31/an;
Reselves 100. 951 M::ti
8.R . 59:1322 M::ti
Fcrecast Erm:! ~ . Råe
Fcrecast Dåe
00:0
01
Case1
1
O.213æ3Ae.
1$ 7Q2 WId
1!D.D
Schlumberger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
10/07/03
NO. 2984
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Color
Well Job # Log Description Date Blueline Prints CD
P2- 1 I ss. TE,,P & PRESSURE SURVEY 10 03 07
:GNI-01~L~'_--~' -~.~~ TEMP & PRESS SURVEY 10/04/03
D.S. 13-27A,~[ I~- ,~.,_ LDL 10/01/07
D.S. 6-2tA .~}1~--~(''~} LDL
D.S. 14-32 1~<~2~,~'- Jc;~.j~ LDL 10/03/03
C-23B ~.(~'~-~ -(~)(_O~- MEM PPROF & IPROF LOG 09/01/03
F-13A Iq ~ '-Iz~--~ ~ MEM PPROF & IPROF LOG 09/08/03
F-IIA .~- ~'(~ c; MEM PPROF & IPROF LOG 09/09/03
MPS-20 .-'--'""---"~ 10569234 CH EDIT SCMT (PDC) 03103103
MRS'20 ~1~ ~I ~ ~ 0SS9234 SCMT 03~03~03
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
,'i.'~'".~ I~. ...... ,~'~ ~ i~% # [~ ~"~
Anchorage, Alaska 99508 ~,,~. i~,~ ~..~., ~ ~ ~
Date Delivered:
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
~.i STATE OF ALASKA '---~
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate _X Plugging _ Perforate_
Pull tubing _ Alter casing _ Repair well _ Other_
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet)
BP Exploration (Alaska), Inc. Development__X RKB 50 feet
3. Address Explorato~__ 7. Unit or Property name
P. O. Box 196612 Stratigraphic__
Anchorage, AK 99519-6612 Service__ Point Mclntyre Unit
4. Location of well at surface 8. Well number
5276' FNL, 4165' FEL, Sec. 11, T12N, R14E, UM (asp's 681351, 5998580) P2-11
At top of productive interval 9. Permit number / approval number
1098' FNL, 4481' FEL, Sec. 18, T12N, R15E, UM (asp's 691138, 5997727) 198-192
At effective depth 10. APl number
50-029-22923
At total depth 11. Field / Pool
857' FNL, 4147' FEU Sec. 18, T12N, R15E, UM (asp's 691465, 5997971) Point Mclntyre Oil Pool
12. Present well condition summary
Total depth: measured 15203 feet Plugs (measured) Tagged PBTD @ 15149' MD on 2/07/2001.
true vertical 8991 feet
Effective depth: measured 15149 feet Junk (measured)
true vertical 8981 feet
Casing Length Size Cemented Measured Depth True Vertical Depth
Conductor 118' 20" driven 1 18' 118'
Surface 5691' 9-5/8" 1468 Sx CS III & 400 Sx Class G 5741' 4970'
Intermediate 14604' 7" 290 Sx C~ass G 14654' 8937'
Liner 787' 4-1/2" 420 Sx C~ass G 15199' 8991'
Perforation depth: measured 14915'-14975'; 15000'- 15088'; 15100'-15140'.
true vertical 8966' - 8970'; 8872' - 8974'; 8974' - 8979'.
Tubing (size, grade, and measured depth) 3-1/2", 9.2#, 13CR Tbg @ 14438' MD.
Packers & SSSV (type & measured depth) 7" x 4-1/2" Baker S-3 Packer @ 14391' MD.
TRSSSV, HES SERIES 10 @ 2195' MD.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14. Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 324 267 509 - 774
Subsequent to operation 306 310 575 - 775
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run __
Daily Report of Well Operations ___X Oil __X Gas __ Suspended __ Service
17. I hereby ce.r~j~ that the fjx~going is true and correct to the best of my knowledge.
G°r o~'n Kidd(-'''''/ ~'/d
Prepared by Paul Rauf 564-5799
Form 10-404 Rev 06/15/88 ·
SUBMIT IN DUPLICATE
Well Compliance Report
File on Left side of folder
198-192-0 POINT MCINTYRE
Roll #1: Start: Stop Roll #2:
MD 15203 TVD 08991 Completion Date:
P2-11 50- 029-22923-00 BP EXPLORATION
(ALASKA) INC
Start Stop
10/28/98 Completed Status: 1-OIL Current:
Name
D 8816
D 8834
D 8854
L CDR-ME
L DGR/CNP/SLD-MD
L DGR/CNP/SLD-MD
L DGR/CNP/SLD-TVD
DGR/CNP/SLD-TVD
L DGR/EWR4-MD
L DGR/EWR4-MD
L DGR/EWR4-TVD
DGR/EWR4-TVD
R SRVY RPT
R SRVY RPT
Daily Well Ops __ -- --
Was the well cored? yes no
Comments:
Interval
1 SCHLUM USIT
2-5 SPERRY MPT/GR/EWR4/CNP/SLD OH
2,3 SPERRY MPT/GR/EWR4/CNP/SLD PB OH
FINAL BL(C) 14000-15100 CH
FINAL 5669-15203 OH
FINAL 5669-15064 PB1 OH
FINAL 4970-8991 OH
FINAL 4970-9116 PB1
FINAL 5669-15203
FINAL 5669-15064 PB1
FINAL 4970-8991
FINAL 4970-9116 PB1
SPERRY 14630.39-15203.
SPERRY 5442.-15066. PB1
Sent Received T/C/D
Are Dry Ditch Samples Required? yes
Analysis Description Received? yes no
CH 11/24/98 11/6/98
2/3/99 2/2/99
2/3/99 2/2/99
5 11/24/98 11/6/98 D
2/10/99 2/10/99
2/10/99 2/10/99
2/10/99 2/10/99
OH 2/10/992/10/99 )~
OH 2/10/992/10/99 (~
OH 2/10/992/10/99 ~~
OH 2/10/99 2/10/99
OH 2/10/99 2/10/99
OH 11/10/98 11/12/98
OH 11/10/98 11/12/98
no And Received? yes no
Sample Set #
Wednesday, November 08, 2000 Page 1 of 1
STATE OF ALASKA
ALASK~ OIL AND GAS CONSERVATION COMMIS~0N
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Per/orate _X
Pull tubing _ Alter casing _ Repair well _ Other_
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P. O. Box 100360
Anchorage, AK 99510-0360
4. Location of well at surface
5276' FNL, 4165' FEL, Sec. 11, T12N, R14E, UM
At top of productive jp,~erval
1098' FNL, 4481' FEL, Sec. 18, T12N, R15E, UM
At effective depth
At total depth ~
857' FNL, 4147' FEL, Sec. 18, T12N, R15E, UM
5. Type of Well:
Development__X
Explorato~
St ratig raph ic__
Service__
(asp's 681351,5998580)
(asp's 691138,5997727)
(asp's 691465, 5997971)
6. Datum elevation (DF or KB feet)
RKB 50 feet
7. Unit or Property name
Point Mclntyre Unit
8. Well number
P2-11
9. Permit number / approval number
198-192
10. APl number
50-029-22923
11. Field / Pool
Point Mclntyre Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Conductor 1 18'
Surface 5691'
Intermediate 14604'
Liner 787'
15203 feet Plugs (measured)
8991 feet
15148 feet Junk (measured)
8981 feet
Size Cemented
20" driven
9-5/8" 1468S..x..CS III & 400 Sx Class G
7" 290 sx ci~s.G
4-1/2" 120 Sx Class G ..
..
._
Tagged PBTD @ 15148' MD (5/30/2000)
Measured Depth True vertical Depth
118' 118'
5741' 4970'
14654' 8937'
15199' 8991'
Perforation depth:
measured 14915'-14975'; 15000'-15088'; 15100'-15140'.
true vertical 8966' - 8970'; 8872' - 8974'; 8974' - 8979'.
Tubing (size, grade, and measured depth) 3-1/2", 9.2#, 13CR-I-bg @ 14438' MD.
Packers & SSSV (type & measured depth) 7" x 4-1/2" Baker S-3 Packer @ 14391' MD.
TRSSSV, HES SERIES 10 @ 2195' MD.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
OiFBbl
316
1647
Representative Daily Average Production or Iniection Data
Gas-Mcr Water-Bbl
- 292
68O
Casing Pressure Tubing Pressure
- 757
738
15. Attachments
Copies of Logs and Surveys run __
Daily Report of Well Operations __X
16. Status of well classification as:
Oil __X Gas __ Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
SignedErin Oba ~~ ~1~ · ~ Title ARCO EngineeringSupervisor
Prepared by Paul Rauf 263-4990
Form 10-404 Rev 06/15/88 ·
SUBMIT IN DUPLICATE
P2-11
DESCRIPTION OF WORK COMPLETED
PERFORATING OPERATIONS
Date
Event Summary
4/17/2000:
5/30/2000:
MIRU CTU. PT'd equip to 3500 psi. RIH w/CT conveyed perf guns & tagged XN Nipple for tie-
in @ 14414' corrected to ELM. Shot 60' of add perforations @'
14915'- 14975' MD
Used 2" carriers and all shots at 6 SPF, 60° phasing, and random orientation. POOH w/guns.
ASF. FP'd well. RD CTU.
MIRU CTU. PT'd equip to 40500 psi. RIH w/CT conveyed peri= guns &tagged PBTD @ 15148'.
Logged f/15131' - 14277'. Shot 40' of add perforations as follows:
15100'- 15140' MD
Used 2" carriers and all shots at 6 SPF, 60° phasing, underbalanced press, and random
orientation. POOH w/guns. ASF. FP'd well. RD CTU.
Returned well to production & obtained a valid welltest.
H/L L LOG
TFIAIIISMITTAL
ProActive Diagnostic Services, Inc.
::- ~'.~ 0 5 2000
AJaska ~! & Gas C~s. ~mmission
To:
ARCO Alaska, Inc.
AOGCC Lori Taylor
3010 Porcupine Drive
Anchorage, Alaska 99501
RE' Distribution- Final Print[s)
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of
this transmittal letter to the attention of'
Robert Richey
PDS, Inc.
Mail Pouch 340112
Prudhoe Bay, AK 99734
LOG DIGITAL MYLAR / BLUE LINE REPORT
WELL DATE TYPE OR SEPIA PRINT(S) OR
CD-ROM FILM BLUE LINE
Open Hole I I 1
Res. Eval. CH I I 1
P2-11 5-29-00 Mech. CH 1
Caliper Survey 1
mr_mr \1 F- I~
-I~ i-k_.l v
Signed ·
Print Name:
Date' JUN 05 ~,000
Naska 0ii &-Gas Cons. Commission
Anchorage
ProActive Diagnostic Services, Inc., Pouch 340112, Prudhoe Bay, AK 99734
Phone:(907)659-2307 Fax:(907)659-2314 E-maih pdsprudho~NAS00.nct Websit¢: %%%~%v.mcmon4og.com
\~Big_boy\c - big.boyLMy Documents~Distribution_FormsLArco_ptmac_form.doc
..... STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X
Pull tubing _ Alter casing _ Repair well _ Other_
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet)
ARCO Alaska, Inc. Development__X RKB 50 feet
3. Address Explorato~.__ 7. Unit or Property name
P. O. Box 100360 Stratigraphic__
Anchorage, AK 99510-0360 Servi~ Point Mclntyre Unit
4. Location of well at surface 8. Well number
5276' FNL, 4165' FEL, Sec. 11, T12N, R14E, UM P2-11
At top of productive interval 9. Permit number / approval number
1098' FNL, 317' FWL, Sec. 18, T12N, R15E, UM 98-192
At effective depth 10. APl number
50-029-22923
At total depth 11. Field / Pool
857' FNL, 4147' FEL, Sec. 18, T12N, R15E, UM Point Mclntyre Oil Pool
12. Present well condition summary
Total depth: measured 15203 feet Plugs (measured) Tagged PBTD @ 15118' MD (11/04/1999)
true vertical 8991 feet
Effective depth: measured 15118 feet Junk (measured)
true vertical 8976 feet
Casing Length Size Cemented Measured Depth True vertical Depth
Conductor 118' 20" driven 118' 118'
Surface 5691' 9-5/8" 1468 Sx cs III & 40o Sx Class G 5741' 4970'
Intermediate 14604' 7" 290 sx c~ass G 14654' 8937'
Liner 787' 4-1/2" 12o Sx Class G 15199' 8991'
Perforation depth: measured 15000'- 15088'. O~/c/j/t~/
'true vertical 8872' - 8974'.
Tubing (size, grade, and measured depth) 3-1/2", 9.2#, 13CR Tbg @ 14438' MD. "' ' , '-
Packers & SSSV (type & measured depth) 7" x 4-1/2" Baker S-3 Packer @ 14391' MD. '~i~',¢/'.~.~. ':'t:~'~ 7.
TRSSSV, HES SERIES 10 @ 2195' MD. '
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14. Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 133 n/a 113 717
Subsequent to operation 1742 118 423 746
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run __
Daily Report of Well Operations ._X Oil __X Gas __ Suspended __ Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
SignedErin Oba ~~'~ '~--°''~ ~''4~)~'- Title ARCO Engineeringsupervis°r Date
Prepared by Paul Rauf 263-4990 ~ ·
Form 10-404 Rev 06/15/88 ·
SUBMIT IN DUPLICATE
P2-11
DESCRIPTION OF WORK COMPLETED
PERFORATING OPERATIONS
Date
Event Summary
10/30/1999:
11/4 - 5/1999:
RIH &tagged PBTD @ 15119' CTM.
MIRU CTU. PT'd equip to 3500 psi. RIH w/perf guns & tagged PBTD @ 15118' MD. Shot 88'
of reperforations @:
15000' - 15088' MD
Used 2-1/2" carriers and all shots at 6 SPF, 60° phasing, and random orientation. POOH w/
guns. ASF. RDMOL.
Returned well to production & obtained a valid welltest.
Alaska-Oil & Gas Cons. Commission
Anchorage
I-I I::t I I__1__ I IM G S I:= F! ~./I I-- E S
WELL LOG TRANSMITTAL
To: State of Alaska February 10, 1999
Alaska Oil and Gas Conservation Comm.
Attn.: Lori Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501
RE: MWD Formation Evaluation Logs P2-11 & P2-11 PB1, AK-MM-80391
The technical data listed below is being submitted herewith. Please address any problems or concerns
to the attention of.'
Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
P2-11:
2" x 5" MD Resistivity & Gamma Ray Logs:
50-029-22923-00
2" x 5" TVD Resistivity & Gamma Ray Logs:
50-029-22923-00
2" x 5" MD Neutron & Density Logs:
50-029-22923-00
2" x 5" MD Neutron & Density Logs:
50-029-22923-00
P2-11 PBI:
2" x 5" MD Resistivity & Gamma Ray Logs:
50-029-22923 -70
2"x 5" TVD Resistivity & Gamma Ray Logs:
50-029-22923 -70
2" x 5" MD Neutron & Density Logs:
50-029-22923 -70
2" x 5" MD Neutron & Density Logs:
50-029-22923-70
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
Blueline
Folded Sepia
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 .
A Halliburton Oompany
OIl:III_LING S I= I::! ~J I I~ I::: S
WELL LOG TRANSMITTAL
To: State of Alaska February 3, 1999
Alaska Oil and Gas Conservation Comm.
Attn.' Lori Taylor
3001 Porcupine Drive. ~~~-~>~
Anchorage, Alaska 99501 ~ L~
MWD Formation Evaluation Logs - P2-11 PB1, AK-MM-80391
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention off
Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
1 LDWG formatted Disc with verification listing.
API#: 50-029-22923-70
RECEIVED
.~das~a 0-,t & Gas Cons.
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535
A Halliburton Company
0 F! I 1--111M CS SEFt~JI C: ~ S
WELL LOG TRANSMITTAL
To: State of Alaska February 3, 1999
Alaska Oil and Gas Conservation Comm.
Attn.: Loft Taylor
3001 Porcupine Drive. ~
Anchorage, Alaska 99501 ~ ~' La~ ~2~
MWD Formation Evaluation Logs - P2-11, AK-MM-80391
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention off
Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
1 LDWG formatted Disc with verification listing.
API#: 50-029-22923-00
RECEdeD
FEB 0£ i999
AJaska 0il & Gas Cons.
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535
A Halliburton Company
~ . STATE OF ALASKA ,.~
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
i. Status of Well Classification of Service Well
[] Oil [~ Gas E~ Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
ARCO Alaska Inc. 98-192 398-278
2. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22923
4. Location of well at surface !'i,'i ~ 9. Unit or Lease Name
1'NSL, 1115'EWL, SEC. 11 T12N, R14E, UM, _~ ,,~1¼'~:~ ~T~~~ ,-- ~., PointMclntyre
At top of productive interval [~_x j',/~ ~ ~¢~*'~, ~._i
......... 'ii ~ ! 10. Well Number
1098' SNL, 317' EWE, SEC. 18, T12N, R15E, UM .;,~_-t'~
At total depth
; .... ,- : 11 Field and Pool
854' SNL, 651' EWL, SEC. 18, T12N, R15E, UM ~:'~'~'::;":-%~ :i¥:?:'¢ ' Point Mclntyre
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and ~
KBE = 49.8I ADL 034627
12. Date Spudded 113. Date T.D. Reached I 14. Date Comp., Susp., or Aband.tl 5. Water depth, if offshore I16. No. of Completions
9/27/98 10/19/98 10/28/98./ N/A MSLI One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) I19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost
15203' 8991 FT 15152 8982 FTI [~Yes []NoI 2195' MDI 1800' (Approx.)
22. Type Electric or Other Logs Run
MWD, Gyro, LWD, GR/RES
23. CASlNG~ LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 133# H-40 40' 118' 30" Driven
9-5/8" 40# L-80 38' 5742' 12-1/4" 1295 sx PF 'E', 470 sx Class 'G'
,,,
7" 26#/29# L-80/13CR 36' 14654' 8-3/4" 290 sx Class 'G'
4-1/2" 12.6 13CR 14412 15199' 8-3/4" 120 sx Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
2-3/4" Gun Diameter, 4 spf 3-1/2", 9.2#, 13CR 11439' 14391'
MD TVD MD TVD
15000' - 15088' 8972' - 8974'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
,,,
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
,,,
Freeze Protect with 200 bbls. Diesel
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
December 24, 1998I Gas Lift
Date of Test Hours Tested PRODUCTION FOR OIL-EEL IGAS-MCF WATER-BBL CHOKE SIZE ]GAs-OIL RATIO
TEST PERIOD
I
I
Flow Tubing Casing Pressure CALCULATED OIL-DEL IGAS-MCF WATER-DEL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
RECEIVED
ORIGINAL
1,5 1999
~Ng$~ 0il & 8a$ Cons. Commissior~
A.~chorage
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
Kuparuk Zone LC3 14710' 8956'
,.
31. List of Attachments
Summary of Daily Drilling Reports, Survey
32. I hereby certify tha..t~;he fore¢¢ng is true a~d correct to the best of my knowledge
Signed Lowell Cra~e'r. !+~-, ..... nrdhnn! i ,.~d3~lneenn' g Supervisor Date
( ~ 98-192 398-278 Prepared By Name/Number: Carol Withey, 564-4114
P2-1
1
Well Number~J Permit No. / Approval No.
! NSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 2?: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Facility
Date/Time
26 Sep 98
27 Sep 98
28 Sep 98
29 Sep 98
30 Sep 98
O1 Oct 98
02 Oct 98
Pt Mac 2
Progress Report
Well P2-11
Rig Nabors 33E
Page
Date
Duration
Activity
19:00-20:00
20:00-23:00
23:00-03:00
03:00-06:00
06:00-07:00
07:00-08:00
08:00-09:00
09:00-10:00
10:00-12:00
12:00-14:00
14:00-23:30
23:30-00:30
00:30-06:00
06:00-06:00
06:00-01:00
01:00-02:00
02:00-02:15
02:15-06:00
06:00-10:00
10:00-12:00
12:00-13:30
13:30-16:30
16:30-17:45
17:45-21:30
21:30-22:00
22:00-04:00
04:00-06:00
06:00-06:30
06:30-07:00
07:00-07:15
07:15-07:45
07:45-08:00
08:00-08:30
08:30-11:30
11:30-11:45
11:45-12:00
12:00-12:15
12:15-12:45
12:45-13:00
13:00-13:15
13:15-13:30
13:30-16:30
16:30-18:00
18:00-04:00
04:00-06:00
06:00-07:00
07:00-07:30
07:30-08:30
08:30-09:00
09:00-12:00
12:00-14:00
14:00-17:00
17:00-18:00
18:00-18:30
lhr
3hr
4hr
3hr
lhr
lhr
lhr
lhr
2hr
2hr
9-1/2 hr
lhr
5-1/2 hr
24 hr
19hr
lhr
1/4hr
3-3/4 hr
4hr
2hr
1-1/2 hr
3hr
1-1/4 hr
3-3/4 hr
1/2 hr
6hr
2hr
1/2 hr
1/2 hr
1/4 hr
1/2 hr
1/4 hr
1/2 hr
3hr
1/4 hr
1/4 hr
1/4 hr
1/2 hr
1/4hr
1/4 hr
1/4 hr
3hr
1-1/2 hr
10hr
2 hr
lhr
1/2 hr
lhr
1/2 hr
3hr
2hr
3hr
lhr
1/2 hr
Rig moved 100.00 %
Rigged up Bell nipple
Fill pits with Water based mud
Racked back HWDP
Held safety meeting
Made up BHA no. 1
Repaired SCR
Drilled to 218.0 ft
Made up BHA no. 1
Took Gyro survey at 150.0 ft
Drilled to 998.0 ft
Serviced Mud shakers
Drilled to 1278.0 ft
Drilled to 4205.0 ft (cont...)
Drilled to 5755.0 ft (cont...)
Circulated at 5755.0 ft
Flow check
Pulled out of hole to 2500.0 ft
Pulled out of hole to 2500.0 ft (cont...)
R.I.H. to 5755.0 ft
Circulated at 5755.0 ft
Pulled out of hole to 1000.0 ft
Laid down 660.0 ft of 5in OD drill pipe
Rigged up Casing handling equipment
Held safety meeting
Installed Casing
Circulated at 5755.0 ft
Held safety meeting
Tested High pressure lines
Pumped Water spacers - volume 40.000 bbl
Mixed and pumped slurry - 223.000 bbl
Mixed and pumped slurry - 93.000 bbl
Displaced slurry - 429.000 bbl
Circulated at 2020.0 ft
Held safety meeting
Tested High pressure lines
Pumped Water spacers - volume 30.000 bbl
Mixed and pumped slurry - 282.000 bbl
Displaced slurry - 142.000 bbl
Functioned DV collar
Functioned Float collar
Rigged down Cement head
Rigged down Bell nipple
Rigged up BOP stack
Tested BOP stack
Tested BOP stack (cont...)
Retrieved BOP test plug assembly
Installed Wear bushing
Held safety meeting
Made up BHA no. 2
Singled in drill pipe to 2020.0 ft
Drilled installed equipment - DV collar
Singled in drill pipe to 2750.0 ft
Repaired Drillstring handling equipment
1
18 November 98
Facility
Date/Time
03 Oct 98
04 Oct 98
05 Oct 98
06 Oct 98
07 Oct 98
08 Oct 98
09 Oct 98
Pt Mac 2
Progress Report
Well P2-11
Rig Nabors 33E
Duration
Activity
18:30-20:00
20:00-21:30
21:30-22:00
22:00-01:00
01:00-01:30
01:30-02:00
02:00-02:30
02:30-03:45
03:45-04:00
04:00-04:15
04:15-05:00
05:00-06:00
06:00-06:00
06:00-12:00
12:00-13:00
13:00-15:00
15:00-16:00
16:00-20:00
20:00-00:30
00:30-01:30
01:30-02:00
02:00-04:30
04:30-06:00
06:00-07:00
07:00-08:00
08:00-08:30
08:30-06:00
06:00-19:00
19:00-21:00
21:00-00:45
00:45-01:00
01:00-02:00
02:00-04:30
04:30-06:00
06:00-07:30
07:30-08:30
08:30-09:00
09:00-09:15
09:15-10:30
10:30-11:30
11:30-12:30
12:30-13:30
13:30-13:45
13:45-15:00
15:00-16:30
16:30-19:00
19:00-00:30
00:30-01:00
01:00-06:00
06:00-04:30
04:30-06:00
06:00-07:00
07:00-11:30
11:30-12:30
1-1/2 hr
1-1/2 hr
1/2 hr
3hr
1/2 hr
1/2 hr
1/2 hr
1-1/4 hr
1/4 hr
1/4 hr
3/4 hr
lhr
24 hr
6 hr
lhr
2hr
lhr
4hr
4-1/2 hr
lhr
1/2 hr
2-1/2 hr
1-1/2 hr
lhr
lhr
1/2 hr
21-1/2 hr
13hr
2hr
3-3/4 hr
1/4 hr
lhr
2-1/2 hr
1-1/2 hr
1-1/2 hr
lhr
1/2 hr
1/4 hr
1-1/4 hr
lhr
lhr
lhr
1/4 hr
1-1/4 hr
1-1/2 hr
2-1/2 hr
5-1/2 hr
1/2 hr
5 hr
22-1/2 hr
1-1/2 hr
lhr
4-1/2 hr
lhr
Singled in drill pipe to 5668.0 ft
Circulated at 5668.0 ft
Rigged up Logging/braided cable equipment
Conducted electric cable operations
Rigged down Logging/braided cable equipment
Tested Casing
Held drill (Kick (well kill))
Drilled cement to 5755.0 ft
Drilled to 5777.0 ft
Circulated at 5777.0 ft
Performed formation integrity test
Drilled to 5877.0 ft
Drilled to 8516.0 ft (cont...)
Drilled to 9462.0 ft (cont...)
Circulated at 9462.0 ft
Pulled out of hole to 5742.0 ft
Serviced Top drive
Singled in drill pipe to 9462.0 ft
Drilled to 9871.0 ft
Repaired Top drive blower
Circulated at 9871.0 ft
Pulled out of hole to 5742.0 ft
Repaired Top drive blower
Repaired Top drive blower (cont...)
R.I.H. to 9832.0 ft
Washed to 9871.0 ft
Drilled to 12006.0 ft
Drilled to 13236.0 ft (cont...)
Circulated at 13236.0 ft
Pulled out of hole to 5742.0 ft
Flow check
Pulled out of hole to 475.0 ft
Pulled BHA
Made up BHA no. 3
Made up BHA no. 3 (cont...)
Singled in drill pipe to 1525.0 ft
R.I.H. to 3000.0 ft
Tested LWD tool - Via_string
R.I.H. to 5720.0 ft
Serviced Draw works
Serviced Top drive
R.I.H. to 7193.0 ft
Took MWD survey at 7193.0 ft
R.I.H. to 13236.0 ft
Circulated at 13236.0 ft
Circulated at 13236.0 ft
Drilled to 13335.0 ft
Circulated at 15535.0 ft
Drilled to 13737.0 fl
Drilled to 15066.0 fl (cont...)
Circulated at 15066.0 ft
Circulated at 15066.0 fl (cont...)
Pulled out of hole to 5710.0 ft
Serviced Drillslring handling equipment
Page
Date
2
18 November 98
Facility
Pt Mac 2
Progress Report
Well P2-11
Rig Nabors 33E
Page
Date
3
18 November 98
Date/Time
10 Oct 98
11 Oct 98
12 Oct 98
13 Oct 98
14 Oct 98
12:30-13:00
13:00-13:15
13:15-16:00
16:00-16:30
16:30-21:00
21:00-22:30
22:30-00:30
00:30-02:30
02:30-03:30
03:30-05:00
05:00-06:00
06:00-12:30
12:30-14:00
14:00-16:00
16:00-17:00
17:00-19:00
19:00-21:30
21:30-04:00
04:00-04:30
04:30-06:00
06:00-12:00
12:00-13:00
13:00-15:00
15:00-18:00
18:00-22:30
22:30-23:30
23:30-00:00
00:00-01:00
01:00-02:00
02:00-03:00
03:00-03:15
03:15-03:30
03:30-05:30
05:30-06:00
06:00-07:00
07:00-09:00
09:00-10:30
10:30-13:00
13:00-18:30
18:30-02:00
02:00-03:00
03:00-05:00
05:00-06:00
06:00-09:00
09:00-10:00
10:00-13:00
13:00-06:00
06:00-09:00
09:00-10:00
10:00-14:30
14:30-15:30
15:30-16:30
16:30-19:00
19:00-20:30
Duration
1/2 hr
1/4 hr
2-3/4 hr
1/2 hr
4-1/2 hr
1-1/2 hr
2hr
2 hr
lhr
1-1/2 hr
lhr
6-1/2 hr
1-1/2 hr
2hr
1 hr
2hr
2-1/2 hr
6-1/2 hr
1/2 hr
1-1/2 hr
6 hr
lhr
2hr
3hr
4-1/2 hr
lhr
1/2 hr
lhr
lhr
lhr
1/4 hr
1/4 hr
2hr
1/2 hr
lhr
2hr
1-1/2 hr
2-1/2 hr
5-1/2 hr
7-1/2 hr
lhr
2hr
lhr
3hr
lhr
3 hr
17hr
3hr
lhr
4-1/2 hr
lhr
lhr
2-1/2 hr
1-1/2 hr
Activity
R.I.H. to 5964.0 ft
Took MWD survey at 5964.0 ft
R.I.H. to 14900.0 ft
Reamed to 15066.0 ft
Repaired Kelly/top drive hose
Reamed to 15066.0 ft
Circulated at 15066.0 ft
Pulled out of hole to 13926.0 ft
R.I.H. to 15066.0 ft
Circulated at 15066.0 ft
Pulled out of hole to 14200.0 ft
Pulled out of hole to 500.0 ft (cont...)
Downloaded MWD tool
Pulled BHA
Serviced Draw works
Rigged up Top ram
Rigged up Casing handling equipment
Ran Casing to 5740.0 ft (7in OD)
Circulated at 5740.0 ft
Ran Casing to 7in (6500.0 ft OD)
Ran Casing to 12800.0 ft (7in OD) (cont...)
Circulated at 12800.0 ft
Ran Casing to 14600.0 ft (7in OD)
Circulated at 14600.0 ft
Circulated at 14655.0 ft
Pulled Casing in stands to 14535.0 ft
Rigged up Casing handling equipment
Ran Casing to 14655.0 ft (7in OD)
Rigged up Cement unit
Batch mixed slurry - 60.000 bbl
Held safety meeting
Tested High pressure lines
Displaced slurry - 550.000 bbl
Tested Casing
Rigged down Casing handling equipment
Installed Seal assembly
Removed BOP stack
Laid down 1000.0 ft of Drillpipe
Repaired Service lines
Laid out 5in drill pipe from derrick
Installed BOP stack
Serviced Top drive pipe handler
Rigged up BOP stack
Tested BOP stack
Installed Wear bushing
Made up BHA no. 4
Singled in drill pipe to 13000.0 ft
Singled in drill pipe to 14509.0 ft (cont...)
Drilled cement to 14587.0 ft
Circulated at 14550.0 ft
Drilled cement to 16642.0 ft
Circulated at 16642.0 ft
Reamed to 16676.0 ft
Circulated at 14642.0 ft
Facility
Date/Time
15 Oct 98
16 Oct 98
17 Oct 98
18 Oct 98
19 Oct 98
20 Oct 98
Pt Mac 2
Progress Report
Well P2-11
Rig Nabors 33E
Page
Date
Duration
Activity
20:30-01:30
01:30-02:30
02:30-04:00
04:00-06:00
06:00-08:00
08:00-09:30
09:30-13:00
13:00-15:00
15:00-15:30
15:30-17:00
17:00-18:00
18:00-23:00
23:00-00:00
00:00-02:30
02:30-06:00
06:00-07:00
07:00-09:00
09:00-10:30
10:30-12:30
12:30-14:00
14:00-15:00
15:00-15:30
15:30-18:30
18:30-19:30
19:30-20:00
20:00-00:00
00:00-06:00
06:00-07:30
07:30-09:30
09:30-12:00
12:00-13:00
13:00-16:30
16:30-17:30
17:30-22:30
22:30-23:30
23:30-00:00
00:00-01:30
01:30-06:00
06:00-06:00
06:00-18:30
18:30-19:30
19:30-01:30
01:30-03:00
03:00-03:30
03:30-06:00
06:00-08:30
08:30-10:00
10:00-10:30
10:30-13:00
13:00-13:30
13:30-14:00
14:00-17:00
17:00-21:30
21:30-22:30
5hr
1 hr
1-1/2 hr
2hr
2 hr
1-1/2 hr
3-1/2 hr
2hr
1/2 hr
1-1/2 hr
lhr
5hr
lhr
2-1/2 hr
3-1/2 hr
lhr
2hr
1-1/2 hr
2hr
1-1/2 hr
lhr
1/2 hr
3 hr
lhr
1/2 hr
4 hr
6hr
1-1/2 hr
2hr
2-1/2 hr
lhr
3-1/2 hr
lhr
5hr
lhr
1/2 hr
1-1/2 hr
4-1/2 hr
24 hr
12-1/2 hr
lhr
6 hr
1-1/2 hr
1/2 hr
2-1/2 hr
2-1/2 hr
1-1/2 hr
1/2 hr
2-1/2 hr
1/2 hr
1/2 hr
3hr
4-1/2 hr
lhr
Pulled out of hole to 406.0 ft
Pulled BHA
Made up BHA no. 5
R.I.H. to 4000.0 ft
Serviced Block line
R.I.H. to 7200.0 ft
Repaired Top drive
R.I.H. to 14600.0 ft
Circulated at 14600.0 ft
Reamed to 14676.0 ft
Circulated at 14600.0 ft
Pulled out of hole to 420.0 ft
Pulled BHA
Serviced Top drive pipe handler
Made up BHA no. 6
Made up BHA no. 6 (cont...)
Serviced Top drive pipe handler
R.I.H. to 3500.0 ft
Repaired Electromagnetic brake
R.I.H. to 14642.0 ft
Circulated at 14642.0 ft
Washed to 14676.0 ft
Drilled to 14690.0 ft
Circulated at 14690.0 ft
Drilled to 14696.0 ft
Circulated at 14696.0 ft
Pulled out of hole to 2000.0 ft
Pulled out of hole to 420.0 ft (cont...)
Pulled BHA
Made up BHA no. 7
Functioned Mud motor
Pulled BHA
Made up BHA no. 7
R.I.H. to 14642.0 ft
Circulated at 14642.0 ft
Performed formation integrity test
Washed to 14696.0 ft
Drilled to 14785.0 ft
Drilled to 15095.0 ft (cont...)
Drilled to 15203.0 ft (cont...)
Circulated at 15203.0 ft
Pulled out of hole to 220.0 ft
Pulled BHA
Made up BHA no. 8
R.I.H. to 4000.0 ft
R.I.H. to 14624.0 ft (cont...)
Circulated at 14624.0 ft
R.I.H. to 15203.0 ft
Circulated at 15203.0 ft
Pulled out of hole to 14243.0 ft
Circulated at 14243.0 ft
Circulated at 14243.0 ft
Pulled out of hole to 135.0 ft
Pulled BHA
4
18 November 98
Facility
Date/Time
21 Oct 98
22 Oct 98
23 Oct 98
24 Oct 98
25 Oct 98
26 Oct 98
Progress Report
Pt Mac 2
Well P2-11
Rig Nabors 33E
Page 5
Date 18 November 98
22:30-23:30
23:30-00:00
00:00-03:30
03:30-04:00
04:00-06:00
06:00-14:00
14:00-15:30
15:30-16:00
16:00-19:00
19:00-19:15
19:15-19:30
19:30-20:00
20:00-20:30
20:30-22:30
22:30-04:30
04:30-05:00
05:00-06:00
06:00-09:30
09:30-10:00
10:00-11:30
11:30-13:30
13:30-19:00
19:00-20:30
20:30-21:00
21:00-22:00
22:00-23:00
23:00-23:30
23:30-02:30
02:30-06:00
06:00-09:00
09:00-11:00
11:00-20:30
20:30-23:00
23:00-00:00
00:00-05:30
05:30-06:00
06:00-13:00
13:00-15:30
15:30-20:30
20:30-21:00
21:00-21:30
21:30-23:30
23:30-05:00
05:00-06:00
06:00-06:30
06:30-07:00
07:00-07:30
07:30-08:30
08:30-09:30
09:30-22:30
22:30-00:00
00:00-02:00
02:00-03:30
03:30-04:00
Duration
lhr
1/2 hr
3-1/2 hr
1/2 hr
2hr
8 hr
1-1/2 hr
1/2 hr
3 hr
1/4 hr
1/4 hr
1/2 hr
1/2 hr
2hr
6hr
1/2 hr
1 hr
3-1/2 hr
1/2 hr
1-1/2 hr
2hr
5-1/2 hr
1-1/2 hr
1/2 hr
lhr
lhr
1/2 hr
3hr
3-1/2 hr
3hr
2hr
9-1/2 hr
2-1/2 hr
lhr
5-1/2 hr
1/2 hr
7hr
2-1/2 hr
5hr
1/2 hr
1/2 hr
2hr
5-1/2 hr
lhr
1/2 hr
1/2 hr
1/2 hr
lhr
lhr
13hr
1-1/2 hr
2hr
1-1/2 hr
1/2 hr
Activity
Rigged up Tubing handling equipment
Held safety meeting
Ran Liner to 828.0 ft (4-1/2in OD)
Circulated at 823.0 ft
Ran Liner on landing string to 3000.0 ft
Ran Liner on landing string to 14624.0 ft (cont...)
Circulated at 14624.0 ft
Ran Liner on landing string to 15199.0 ft
Circulated at 15199.0 ft
Pumped Water based mud spacers - volume 25.000 bbl
Mixed and pumped slurry - 25.000 bbl
Displaced slurry - 162.000 bbl
Functioned Setting tools
Circulated at 14411.0 ft
Pulled Drillpipe in stands to 0.0 ft
Retrieved Wear bushing
Tested BOP stack
Tested BOP stack (cont...)
Installed Wear bushing
Laid out BHA from derrick
Made up BHA no. 9
R.I.H. to 14411.0 ft
Serviced Block line
R.I.H. to 15157.0 ft
Circulated at 15157.0 ft
Performed cement integrity test
Cleared Kelly/top drive hose
Circulated at 15157.0 ft
Pulled out of hole to 8000.0 ft
Pulled out of hole to 795.0 ft (cont...)
Pulled BHA
Ran logs on tubulars
Conducted electric cable operations
Ran logs on tubulars
Test Computer software unit
Ran logs on tubulars
Ran logs on tubulars (cont...)
Rigged down Logging/braided cable equipment
Pulled out of hole to 93.0 ft
Rigged down sub-surface equipment - Drilling tool / logs
Held safety meeting
Rigged up sub-surface equipment - TCP
Ran Drillpipe in stands to 15088.0 ft
Rigged up High pressure lines
Rigged up High pressure lines (cont...)
Held safety meeting
Perforated
Reverse circulated at 14250.0 ft
Rigged down High pressure lines
Pulled out of hole to 0.0 ft
Retrieved Wear bushing
Installed Top drive
Rigged up Tubing handling equipment
Held safety meeting
Facility
Pt Mac 2
Progress Report
Well P2-11 Page
Rig Nabors 33E Date
6
18 November 98
Date/Time
27 Oct 98
28 Oct 98
04:00-06:00
06:00-05:30
05:30-06:00
06:00-07:00
07:00-12:00
12:00-13:00
13:00-13:30
13:30-14:00
14:00-14:30
14:30-15:00
15:00-15:30
15:30-16:00
16:00-21:00
21:00-00:00
00:00-01:00
01:00-02:00
02:00-02:30
02:30-04:00
04:00-05:00
05:00
06:00-06:15
06:15-07:00
07:00-08:00
08:00-09:30
09:30-11:00
11:00-12:00
12:00-13:00
13:00-14:00
14:00-14:30
14:30-16:30
Duration
2hr
23-1/2 hr
1/2 hr
1 hr
5 hr
lhr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
5hr
3hr
lhr
lhr
1/2 hr
1-1/2 hr
lhr
1/4 hr
3/4 hr
lhr
1-1/2 hr
1-1/2 hr
lhr
lhr
lhr
1/2 hr
2 hr
Activity
Ran Tubing to 3-1/2in (300.0 ft OD)
Ran Tubing to 12225.0 ft (3-1/2in OD) (cont...)
Installed SCSSSV nipple assembly
Installed SCSSSV nipple assembly (cont...)
Ran Tubing to 14227.0 ft (3-1/2in OD)
Space out tubulars
Rigged up Tubing hanger
Rigged up sub-surface equipment - SCSSSV control line
Ran Tubing to 14439.0 ft (3-1/2in OD)
Rigged down Tubing handling equipment
Installed Hanger plug
Held safety meeting
Rigged down BOP stack
Installed Wellhead integral components
Rigged up High pressure lines
Retrieved Hanger plug
Held safety meeting
Circulated at 0.0 ft
Installed Permanent packer
Rigged up High pressure lines
Rigged up High pressure lines (cont...)
Tested Packer assembly - Via annulus
Functioned Gas lift mandrel assembly
Reverse circulated at 4261.0 ft
Freeze protect well - 200.000 bbl of Diesel
Removed Rig services
Installed Hanger plug
Rigged down Drillfloor / Derrick
Held safety meeting
Rig moved 100.00 %
Operator ARCO
Performance Enquiry Report
Date 20:34, 18 Nov 98
Page
The analysis is from - 05:00, 03 Oct 98 - to - 23:00, 22 Oct 98
Programs in Result Table: P2-11
Well Type
P2-11 Event
P2-11 Event
P2-11 Event
Time From Time To Duration DescriDtion E.M.W.(equivalent mud weight)
05:00, 03 Oct 98 05:00, 03 Oct 98 0 hr 0 min Obtained leak off 13.9
00:00, 18 Oct 98 00:00, 18 Oct 98 0 hr 0 min Obtained required level of integrity 11.6
23:00, 22 Oct 98 23:00, 22 Oct 98 0 hr 0 min Obtained required level of integrity 18.1
Hole Size MDR
8.340
7
Shared Services Drilling Alaska
Point Mclntrye
Alaska State Plane Zone 4
Point Mclntyre Pad 2
P2-11PBI
Job No. AKMMS0291, Surveyed: 9 October, 1998
S UR VEY REPORT
5 November, 1998
Your Reft API-500292292370
KBE- 49.80'
Surface Coordinates: 5998579.63 N, 681350.56 E (70° 24' 04.8250" N, 148° 31' 25.8684" W)
Sl:3er~r'v-sum
I:IR ILLIN{~ SERVICES
Survey Reft svy642
Sperry-Sun Drilling Services
Survey Report for P2-11PBI
Your Ref: API-500292292370
Job No. AKMMS0291, Surveyed: 9 October, ~998
Shared Services Drilling Alaska
Point Mclntrye
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
5442.00 52.410 89.000 4742.83 4792.63
5481.05 54.140 88.800 4766.18 4815.98
5576.58 53.850 87.860 4822.34 4872.14
5671.64 53.220 86.840 4878.84 4928.64
5704.23 53.560 88.570 4898.27 4948.07
5818,68 56.810 92.700 4963.63 5013.43
5912.64 56.590 91.170 5015.21 5065.01
6006.94 57.810 92.020 5066.30 5116.10
6100.46 58.560 94.570 5115.60 5165.40
6195.19 59.570 96.310 5164.30 5214.10
6288.00 61.230 96.740 5210.15 5259.95
6383.91 62.310 97.160 5255.51 5305.31
6479,13 62.630 97.180 5299.52 5349.32
6575.38 64.510 97.000 5342.36 5392.16
6668.88 65.590 94.890 5381.81 5431.61
6763.30 65.440 94.420 5420.94 5470.74
6859.21 65.200 94.790 5460.99 5510.79
6953.68 65.110 95.190 5500.68 5550.48
7048.54 65.660 96.350 5540.19 5589.99
7140.96 66.080 96.190 5577.97 5627.77
7235.27 65.990 95.720 5616.28 5666.08
7327.70 64.380 95.990 5655.07 5704.87
7423.07 65.220 97,730 5695.68 5745.48
7517.17 65.680 98.550 5734.78 5784.58
7613.23 64.540 96.960 5775.21 5825.01
304.72 S 1534.37 E 5998312.24 N 682891.87 E
304,12 S 1565.66 E 5998313.60 N 682923.14 E
301.87 S 1642.91E 5998317.72 N · 683000.31E
298.34 S 1719.27 E 5998323.11N 683076.57 E
297.29 S 1745.41E 5998324.79 N 683102.67 E
298.40 S 1839.32 E 5998325.96 N 683196.58 E
301.05 S 1917,81E 5998325.21 N 683275.11E
303.26 S 1997.04 E 5998324.93 N 683354.37 E
307.83 S 2076.36 E 5998322.28 N 683433.78 E
315.54 S 2157,25 E 5998316.53 N 683514.83 E
324.72 S 2237.42 E 5998309.31N 683595.20 E
334.94 S 2321,30 E 5998301.12 N 683679.30 E
345.48 S 2405.08 E 5998292.62 N 683763.31E
356.12 S 2490,60 E 5998284.06 N 683849.07 E
364.89 S 2574.91E 5998277.34 N 683933.57 E
371.86 S 2660.56 E 5998272.44 N 684019.36 E
378.86 S 2747.43 E 5998267.56 N 684106.37 E
386.32 S 2832.83 E 5998262.18 N 684191.93 E
394.99 S 2918.63 E 5998255.59 N 684277.91E
404.20 S 3002.47 E 5998248.42 N 684361.95 E
413.14 S 3088.18 E 5998241.56 N 684447.86 E
421.70 S 3171.64E 5998235.03 N 684531.50 E
432.01S 3257.31E 5998226.80 N 684617.39 E
444.13 S 3342.04 E 5998216.74 N 684702.39 E
455.89 S 3428.37 E 5998207.08 N 684788.99 E
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Dogleg
Rate
(°/100ft)
Vertical
Section
(ft)
Comment
4.449
0.852
1.088
4.387
4.103
1.381
1.499
2.452
1.902
1.833
1.190
0.337
1.960
2.350
0.480
0.431
0.396
1.254
0.481
0.465
1.762
1.871
0.931
1.914
1558,64
1589.67
1666.20
1741.70
1767.57
1861.02
1939.32
2018.31
2097.66
2178.90
2259.59
2344.09
2428.52
2514.70
2599.46
2685.35
2772.46
2858.16
2944,40
3028.74
3114.92
3198.81
3285.09
3370.64
3457.75
Tie-on Survey
Continued...
5 November, 1998 - 10:22 - 2 - DrillQuest
Shared Services Drilling Alaska
Point Mclntrye
Sperry-Sun Drilling Services
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
7708.50 64.170 96.250 5816.44 5866.24
7802.94 63.730 95.880 5857.92 5907.72
7897.29 64.140 94.890 5899.37 5949.17
7990.39 65.290 95.820 5939.14 5988.94
8085.58 64.410 95.430 5979.59 6029.39
8180.61 61.890 95.100 6022.51 6072.31
8274.99 62.090 95.350 6066.83 6116.63
8369.79 62.590 95.690 6110.84 6160.64
8463.08 62.900 96.010 6153.56 6203.36
8558.90 63.560 95.070 6196.72 6246.52
8653.57 64.520 94.880 6238.16 6287.96
8747.04 62.750 94.230 6279.67 6329.47
8839.13 63.360 94.170 6321.40 6371.20
8933.68 63.350 93.950 6363.80 6413.60
9028.33 64.160 93.400 6405.66 6455.46
9123.19 63.100 95.730 6447.79 6497.59
9218.74 63.870 96.030 6490.45 6540.25
9313.01 64.340 96.050 6531.62 6581.42
9408.97 64.860 96.290 6572.78 6622.58
9496.42 63.270 96.700 6611.03 6660.83
9592.24 63.930 96.490 6653.63 6703.43
9686.04 64.860 96.290 6694.17 6743.97
9778.92 65.390 95,870 6733.24 6783,04
9874.72 63.500 95.100 6774.56 6824.36
9969.69 64.170 96.160 6816.44 6866.24
Survey Report for P2-I IPB1
Your Ref: API.500292292370
Job No. AKMM8029f, Surveyed: 9 October, f998
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
465.77 S 3513.69 E 5998199.27 N
474.74 S 3598.06 E 5998192.35 N
482.69 S 3682.44 E 5998186.45 N '
490.55 S 3766.25 E 5998180.63 N
499.00 S 3852.00 E 5998174.27 N
506.78 S 3936.42 E 5998168.54N
514.37 S 4019.39 E 5998162.96 N
522.44 S 4102.97 E 5998156.92 N
530.90 S 4185.47 E 5998150.47 N
539.15 S 4270.62 E 5998144.28 N
546.53 S 4355.42 E 5998138.96 N
553.19 S 4438.89 E 5998134.33 N
559.20 S 4520.77 E 5998130.31 N
565.18 S 4605.06 E 5998126.37 N
570.62 S 4689.78 E 5998122.99 N
577.38 S 4774.49 E 5998118.29 N
586.14 S 4859.54E 5998111.60 N
595.06 S 4943.87 E 5998104.73 N
604.38 S 5030.06 E 5998097.50 N
613.27 S 5108.19 E 5998090.51N
623,13 S 5193.45 E 5998082.72 N
632.54S 5277.51E 5998075.35 N
641.47 S 5361.30 E 5998068.47 N
649.73 S 5447.33 E 5998062.29 N
658.10 S 5532.15 E 5998055.99 N
684874.52 E
684959.08 E
685043.63 E
685127.60 E
685213.53 E
685298.12 E
685381.25 E
685465.00 E
685547.68 E
685633.01E
685717.96 E
685801.57 E
685883,57 E
685967.98 E
686052.81E
686137.66 E
686222.89 E
686307.42 E
686393.80 E
686472.13 E
686557.60 E
686641.87 E
686725.85 E
686812.05 E
686897.05 E
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Dogleg
Rate
(°/'~00ft)
0.776
0.584
1.038
1.530
0.996
2.670
0.316
0.616
0.451
1.114
1.030
1.994
0.665
0.208
1.002
2.468
0.853
0.499
0.587
1.866
0.716
1.010
0.703
2.102
1.225
Vertical
Section
(ft)
Comment
3543.63
3628.48
3713.22
3797.38
3883.54
3968.30
4051.61
4135.57
4218.50
4304.04
4389.13
4472.83
4554.87
4639.31
4724.11
4809.05
4894.55
4979.35
5066.03
5144.67
523O.5O
5315.09
5399.35
5485.76
5570.99
Continued...
5 November, 1998 - 10:22 - 3 - DrillQuest
Sperry-Sun Drilling Services
Survey Report for P2-11PBI
Your Ref: API-500292292370
Job No. AKMMS0291, Surveyed: 9 October, 1998
Shared Services Drilling Alaska
Point Mclntrye
Measured Sub.Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
10063.63 64.530 95.070 6857.11 6906.91
10159.58 63.120 95.690 6899.43 6949.23
10253.08 63.890 96.250 6941.14 6990.94
10347.76 64.770 96.370 6982.16 7031.96
10441.95 64.790 96.960 7022.29 7072.09
10537.43 64.540 96.440 7063.15 7112.95
10632.49 64.430 95.270 7104.09 7153.89
10726.20 64.350 95.570 7144.60 7194.40
10820.81 64.400 94.120 7185.52 7235.32
10915.10 63.210 96.650 7227.15 7276.95
11012.39 62.890 96.100 7271.24 7321.04
11104.12 62.370 94.790 7313.41 7363.21
11201.62 62.170 94.470 7358.78 7408.58
11293.05 61.820 94.540 7401.71 7451.51
11388.28 62.530 94.930 7446.16 7495.96
11482.06 64.440 95.560 7488.03 7537.83
11576.35 64.280 94.840 7528.83 7578.63
11669.22 65.090 96.620 7568.54 7618.34
11764.14 65.020 .95.810 7608.57 7658.37
11859.30 65.010 95.810 7648.77 7698.57
11954.03 64.640 94.510 7689.06 7738.86
12047.43 64.460 94.640 7729.20 7779.00
12142.73 64.220 93.260 7770.47 7820.27
12237.20 64.220 95.400 7811.56 7861.36
12332.00 63.820 94.450 7853.09 7902.89
666.38 S 5616.43 E 5998049.75 N 686981.51E
674.45 S 5702.16 E 5998043.76 N 687067.40 E
683.16 $ 5785.38 E 5998037.08 N ' 687150.82 E
692.54 S 5870.20 E 5998029.76 N 687235.84 E
702.43 S 5954.83 E 5998021.93 N 687320.69 E
712.50 S 6040.54E 5998013.94 N 687406.61 E
721.25 $ 6125.88 E 5998007.27 N 687492.14 E
729.23 $ 6210.01E 5998001.33 N 687576.43 E
736.43 S 6295.00 E 5997996.19 N 687661.58 E
744.36 S 6379.23 E 5997990.31N 687745.97 E
753.99 S 6465.41E 5997982.77 N 687832.37 E
761.72 S 6546.50 E 5997977.01N 687913.62 E
768.69 S 6632.52 E 5997972.13 N 687999.79 E
775.03 S 6713.00 E 5997967.75 N 688080.39 E
781.98 S 6796.93 E 5997962.83 N 688164.47 E
789.66 S 6880.49 E 5997957.19 N 688248.19 E
797.36 S 6965.14 E 5997951.54N 688333.00 E
805.75 $ 7048.67 E 5997945.18 N 688416.71E
815.07 S 7134.23 E 5997937.95 N 688502.47 E
823.80 S 7220.04 E 5997931.30 N 688588.47 E
831.51 $ 7305.42 E 5997925.66 N 688674.01E
838.24 $ 7389.49 E 5997920.98 N 688758.22 E
844.16 S 7475.18 E 5997917.14 N 688844.03 E
850.58 $ 7560.00 E 5997912.78 N 688928.98 E
857.89 S 7644.91E 5997907.52 N 689014.03 E
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Dogleg
Rate
(°/'~OOft)
1.114
1.580
0.983
0.936
0.567
0.558
1.117
0.301
1.383
2.718
0.602
1.389
0.356
0.389
0.829
2.124
0.709
1.940
0.777
0.011
1.302
0.230
1.329
2.040
0.995
Vertical
Section
(ft)
Comment
5655.67
5741.76
5825.44
5910.77
5995.98
6082.28
6168.06
6252.55
6337.83
6422.41
6509.13
6590.58
6676.85
6757.53
6841.71
6925.61
7010.60
7094.54
7180.60
7266.85
7352.57
7436.86
7522.69
7607.69
7692.89
Continued...
5 November, 1998 - 10:22 - 4 - DrillQuest
Sperry-Sun Drilling Services
Survey Report for P2-11PB1
Your Ref: API-500292292370
Job No. AKMMS0291, Surveyed: 9 October, 1998
Shared Services Drilling Alaska
Point Mclntrye
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
12425.20 63.920 96.170 7894.14 7943.94
12518.59 64.660 97.990 7934.65 7984.45
12613.95 64.280 97.380 7975.75 8025.55
12707.84 63.660 96.690 8016.96 8066.76
12803.12 63.340 96.200 8059.47 8109.27
12897.57 63.040 95.830 8102.07 8151.87
12992.36 64.320 97.010 8144.10 8193.90
13088.45 64.060 96.460 8185.93 8235.73
13181.83 63.780 95.920 8226.99 8276.79
13252.57 63.840 93.440 8258.21 8308.01
13301.96 63.460 93.760 8280.13 8329.93
13395.09 63.140 91.940 8321.98 8371.78
13490.21 63.000 93.950 8365.07 8414.87
13583.55 62.720 98.970 8407.67 8457.47
13681.17 63.920 97.480 8451.50 8501.30
13774.16 63.290 96.800 8492.84 8542.64
13869.58 62.600 97.480 8536.24 8586.04
13964.04 64.300 96.420 8578.46 8628.26
14059.50 63.750 97.040 8620.27 8670.07
14153.42 63.230 96.600 8662.19 8711.99
14248.44 64.320 97.180 8704.18 8753.98
14343.46 63.370 97.650 8746.07 8795.87
14439.07 62.920 96.840 8789.26 8839.06
14535.79 62.360 96.170 8833.71 8883.51
14630.39 63.870 100.010 8876.50 8926.30
865.64S 7728.22 E 5997901.80 N 689097.51E
876.01S 7811.71 E 5997893.46 N 689181.23 E
887.52 S 7896.99 E 5997884.02 N ' 689266.76 E
897.85 S 7980.72 E 5997875.73 N 689350.72 E
907.43 S 8065.45 E 5997868.21N 689435.66 E
916.26 S 8149.28 E 5997861.42 N 689519.68 E
925.76 S 8233.71E 5997853.96 N 689604.31E
935.91S 8319.62 E 5997845.91N 689690.44 E
944.95 $ 8403.00 E 5997838.89 N 689774.02 E
950.13 S 8466.26 E 5997835.25 N 689837.38 E
952.91S 8510.43 E 5997833.54N 689881.61E
957.05 S 8593.52 E 5997831.42 N 689964.77 E
961.41S 8678.21E 5997829.12 N 690049.54E
970.74 $ 8760.70 E 5997821.79 N 690132.24 E
983.21S 8847.03 E 5997811.42 N 690218.85 E
993.57 S 8929.68 E 5997803.07 N 690301.72 E
1004.13 S 9014.00 E 5997794.56 N 690386.27 E
1014.35 S 9097.87 E 5997786.38 N 690470.37 E
1024.40 S 9183.10 E 5997778.40 N 690555.81E
1034.38 S 9266.54E 5997770.44 N 690639.48 E
1044.61S 9351.17 E 5997762.27 N 690724.32 E
1055.62 S 9435.74 E 5997753.32 N 690809.14 E
1066.38 S 9520.36 E 5997744.62 N 690893.99 E
1076.11S 9605.71E 5997736.96 N 690979.55 E
1088.00 $ 9689.21 E 5997727.10 N 691063.32 E
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Dogleg Vertical
Rate Section
(°/~OOft) (ft)
Comment
1.660 7776.54
1.926 7860.68
0.701 7946.70
0.934 8031.06
0.570 8116.33
0.472 8200.62
1.752 8285.58
0.582 8372.08
0.600 8455.96
3.147 8519.40
0.964 8563.61
1.779 8646.65
1.890 8731.30
4.795 8814.32
1.836 8901.50
0.942 8984.78
0.962 9069.75
2.061 9154.24
0.820 9240.06
0.694 9324.10
1.271 9409.33
1.094 9494.60
0.890 9579.89
0.845 9665.79
3.956 9750.10
Continued...
5 November, 1998 - 10:22 - 5 - DrillQuest
Sperry-Sun Drilling Services
Survey Report for P2-11PB1
Your Ref: API-500292292370
Job No. AKMMS0291, Surveyed: 9 October, ~998
Shared Services Drilling Alaska
Point Mclntrye
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
Local Coordinates Global Coordinates
Northings EastingS Northings Eastings
(ft) (ft) (ft) (ft)
14724.59 63.870 99.810 8917.98 8967.78 1102.55 S 9772.52 E 5997714.57 N 691146.96 E
14819.07 64.250 98.860 8959.31 9009.11 1116.33 S 9856.36 E 5997702.83 N 691231.11 E
14914.63 64.630 99.220 9000.54 9050.34 1129.88 S 9941.50 E 5997691.36 N 691316.55 E
15007.43 63.880 98.880 9040.85 9090.65 1143.03 S 10024.04 E 5997680.22 N 691399.39 E
15066.00 63.880 98.880 9066.64 9116.44 1151.14 S 10076.00 E 5997673.36 N 691451.53 E
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 28.044° (26-Sep-98)
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well and calculated along an Azimuth of 96.340° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 15066.00ft.,
The Bottom Hole Displacement is 10141.54ft., in the Direction of 96.518° (True).
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Dogleg
Rate
(o/100ft)
0.191
0.990
0.523
0.873
0.000
Vertical
Section
(ft)
Comment
9834.51
9919.35
1OOO5.47
10088.96
10141.50
Projected Survey
Continued...
5 November, 1998 - 10:22 - 6 - DrillQuest
Shared Services Drilling Alaska
Point Mclntrye
Sperry-Sun Drilling Services
Survey Report for P2-I 1PB1
Your Ref: API-500292292370
Job No. AKMM80291, Surveyed: 9 October, 1998
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comments
Measured Station Coordinates
Depth TVD Northings Eastings
(ft) (ft) (ft) (ft)
5442.00 4792.63 304.72 S 1534.37 E
15066.00 9116.44 1151.14 S 10076.00 E
Comment
Tie-on Survey
Projected Survey
5 November, 1998 - 10:22 - 7- DrillQuest
Shared Services Drilling Alaska
Point Mclntrye
Alaska State Plane Zone 4
Point Mclntyre Pad 2
P2-11
Job No. AKMMS0391, Surveyed: 19 October, 1998
NOV 1'2 1998
vas G,~}s. Co~missio~}
Anchorage:
SURVEY REPORT
5 November, 1998
ORIGINAL
Your Ref'. API-500292292300
KBE - 49.8'
Surface Coordinates: 5998579.63 N, 681350.56 E (70° 24' 04.8250" N, 148° 31'25.8684" W)
DRILL, lNG SERVICES
Survey Ref: svy648
Sperry-Sun Drilling Services
Survey Report for P2-1~
Your Ref: AP1-500292292300
Job No. AKMM80391, Surveyed: 19 October, 1998
Shared Services Drilling Alaska
Point Mclntrye
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
Dogleg
Rate
(o/~ooft)
Vertical
Section
(ft)
Comment
14630.39 63.870 100.010 8876.50 8926.30 1088.00 S 9689.21 E 5997727.10 N 691063.32 E
14642.00 63.870 99.990 8881.61 8931.41 1089.81 S 9699.48 E 5997725.54 N 691073.63 E
14656.68 65.880 99.090 8887.84 8937.64 1092.01 S 9712.59 E 5997723.66 N ' 691086.79 E
14690.09 69.310 97.160 8900.58 8950.38 1096.37 S 9743.16 E 5997720.04 N 691117.46 E
14722.58 77.080 99.030 8909.96 8959.76 1100.75 $ 9773.92 E 5997716.41 N 691148.32 E
14751.05 84.950 102.120 8914.41 8964.21 1105.92 S 9801.54 E 5997711.91 N 691176.05 E
14783.98 91.420 97.920 8915.45 8965.25 1111.64 $ 9833.93 E 5997706.98 N 691208.57 E
14818.60 90.400 87.920 8914.90 8964.70 1113.40 S 9868.45 E 5997706.06 N 691243.13 E
14847.32 89.540 81.520 8914.91 8964.71 1110.76 S 9897,04 E 5997709.39 N 691271.64 E
14881.89 89.750 72.970 8915.13 8964.93 1103.13 $ 9930.72 E 5997717.83 N 691305.13 E
14912.60 88.520 64.620 8915.59 8965.39 1092.04 S 9959.32 E 5997729.62 N 691333.45 E
14943.65 85.590 56.840 8917.19 8966.99 1076.89 $ 9986.35 E 5997745.42 N 691360.10 E
14976.34 84,490 48.050 8920.02 8969.82 1057.06 $ 10012.14 E 5997765.87 N 691385.41 E
15008.78 87.320 40.210 8922.34 8972.14 1033.85 $ 10034.65 E 5997789.61 N 691407.35 E
15044.21 89.570 32.130 8923.31 8973.11 1005.29 $ 10055.53 E 5997818.68 N 691427.53 E
15075.14 89.820 22.120 8923.47 8973.27 977.80 S 10069.62 E 5997846.50 N 691440.94 E
15106.60 84.170 16.970 8925.12 8974.92 948.21 $ 10080.12 E 5997876.33 N 691450.73 E
15132.95 81.350 11.860 8928.44 8978.24 922.91 $ 10086.63 E 5997901.79 N 691456.62 E
15153.32 78.760 7.340 8931.96 8981.76 903.13 S 10089.98 E 5997921.64 N 691459.49 E
15203.00 78.760 7.340 8941.65 8991.45 854.80 S 10096.21 E 5997970.10 N 691464.54 E
0.155
14.774
11.572
24.540
29.646
23.417
29.031
22.484
24.739
27.480
26.741
26.998
25.634
23.664
32.373
24.281
22.013
25.285
0.000
9746.96
9757.34
9770.59
9801.42
9832.45
9860.41
9893.17
9927.72
9955.97
9988.87
10016.41
10042.03
10066.01
10086.43
10104.77
10116.43
10124.35
10128.65
10130.28
10132.31
Tie-on Survey
Projected Survey
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 28.044° (26-Sep-98)
The Dogleg Severity is in Degrees per 100ft.
Vedical Section is from Well and calculated along an Azimuth of 94.950° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 15203.00ft.,
The Bottom Hole Displacement is 10132.33ft., in the Direction of 94.839° (True).
Continued...
5 November, 1998 - 14:10 - 2 - DrillQuest
Shared Services Drilling Alaska
Point Mclntrye
Sperry-Sun Drilling Services
Survey Report for P2-11
Your Ref: API-500292292300
Job No. AKMMS0391, Surveyed: 19 October, ~998
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comments
Measured Station Coordinates
Depth TVD Northings Eastings
(ft) (ft) (ft) (ft)
14630.39 8926.30 1088.00 S 9689.21 E
15203.00 8991.45 854.80 S 10096.21 E
Comment
Tie-on Survey
Projected Survey
5 November, 1998 - 14:10 - 3 - DrillQuest
0 I:i I I__/I I~1G S E l::t~JI 1-- E S
10-Nov-98
AOGCC
Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Re: Distribution of Survey Data for Well P2-11PB1
Dear Lori Taylor:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
5,442.00' MD
'MD
15,066.00' MD
(if applicable)
Please call me at 563-3256 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535
A Halliburton Company
n F:! I I_1_1 ~ G S I::: Ft ~J I r- E S
10-Nov-98
AOGCC
Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Re: Distribution of Survey Data for Well P2-11
Dear Lori Taylor:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
14,630.39' MD
'MD
15,203.00' MD
(if applicable)
Please call me at 563-3256 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535
A Halliburton Company
GeoQuest
3940 Arctic Blvd
Anchorage, AK 99503
AI'rN: Sherrie
NO. 12096
Compan~
Alaska Oil & Gas Cons Comm
Attn: Loft Taylor
3001 Porcupine Drive
Anchorage, AK 99501
11/24/98
Field: Point Mclntyre
Floppy LIS
Well Job # Log Description Date Sepia Disk Tape
',, ·
Please sign and return one copy of this transmifal to Sherfle at the above address or fax to (907) 562-6521: T~ank ~
-, :,
STATE OF ALASKA
'ALASKA OIL AND GAS CONSERVATION COMM~SSION
APPLICATION FOR SUNDRY APPROVAL
11. Type of Request: [] Abandon [] Alter Casing
[] Change Approved Program
2. Name of Operator ARCO Alaska Inc,
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
[]Suspend [] Plugging I--ITime Extension [] Perforate
[] Repair Well [~, Pull Tubing [] Vadance [] Other
[] Operation Shutdown [~ Re-Enter Suspended Well [] Itirnulate Sidetrack
5. Type of well: 6.
[] Development
[] Exploratory 7.
[] Stratigraphic
[--~Service
Plugs (measured)
Junk (measured)
4. Location of well at surface
1' NSL, 1115' EWL, SEC. 11, T12N, R14E, UM
At top of productive Interval
N/A
At effective depth
1091 SNL, 349' EWL, SEC. 18, T12N, R15E, UM
At total depth
1._150' SNL,_631 EWL, S. EC: 18, T12Nt R.l.15E, UM.__.
12. Present well condition summary
Total.depth: measured 15066 feet
true vertical 9116 feet
Effective depth: measured 14655 feet
true vertical 8937 feet
8,
9.
10.
11.
Datum Elevation (DF or KB)
Plan RTE = 49.0'
Unit or Property Name
Point Mclntyre
Well Number
P2-11
Permit Number
98-192
APl Number
50-029-22923
Field and Pool
Point Mclntyre
Casing Length Size
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth: measured N/A
Cemented MD TVD
69' 20" Driven 118' 118'
5704' 9-5/8" 1295 sx Coldset III, 470 sx Class 'G' 5742' 5355'
14619' 7" 290 sx Class 'G' 14655' 8937'
0RI$1NAL
Tubing (size, grade, and measured depth) N/A ~J88kSrhi' -..~.~,r~
Packers and SSSV (type and measured depth) 7" x ~1/2" 9CR HES TNT Packer at 14844' ; ~-1/2" BaI-O IRSSSV at 2000'
13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch
4, Estimated date for commencing operation
October 16, 1998
16. If proposal was verbally approved
Jack Hartz 10/16/98
Name of app rover D a.t.e~,..-/~ ~9_prove d.
Contact Engineer Name/Number: Justin Balkenbush, 564-5238~.-v~
17. I hereby cRrtify that th~ fp. re.~toing is true and correct to the best of my knowledge
Signed ~¢~..,~ ~'~
L~we, Cra,e_~ ~ ~ Z'Z~. g..~a~ Title Drilling~ngineering Supervisor
Commission Use Only
15. Status of well classifications as:
[] Oil [] Gas [] Suspended
Service
Prepared By Name/Number: Carol Withey, ~J64-4114
Conditions of Approval: Notify Commission so representative may~witness
Plug integrity BOPTest / Location clearance
Mechanical Integrity Test .~
Appr0v_ed by order of the Commission
Form 10-403 Rev. 06/15/88
I Approval N°. _~ ~-¢~ 76
Subsequent.., .. , form required 10-
.,~ ~ ~ ~, ~ i,'.'.,
David V~. jcl-tryster[
Commissioner
Submit In Trlplleate
Alaska
hared
ervices
rilling
To: Jack Hartz/Blair Wondzell, AOGCC
·
From: Greg Hobbs, Nabors 33 ODE, SSD
Date: 10/16/98
Re: Point Mclntyre Well P2-11 Completion Changes and. Forward Plans
Well P2-11 (Permit # 98-192) was drilled as a Iongstring producer at Pt. Mclntyre with the
reservoir target in the Kuparuk Sand.
The well was drilled to a TD of 15,066' MD (9116 TVD) without incident. The top Kuparuk
pick is at 14,692' MD (8904' TVD). Upon running the 7" longstring, a ledge was encountered
at 14,654' MD (8887' TVD). The decision was made to set'the Iongstring at this point as an
intermediate casing.
The current plan forward is to clean the original bore out to the TD of 15066'. Attempts to do
this with a rotating assembly and a hole opener (two separate runs) have failed. We are
currently attempting to recover the hole with an oriented assembly.
The first two clean-out attempts were thwarted by a ledge or cement at 14,676' MD driller's
depth (34' MD below the 7" shoe). With the third attempt, we will drill forward for ten feet
looking for the old bore. If we are not successful in this venture, we are planning to sidetrack
the well per the attached directional plan with a kick-off point at 14676' MD.
Should the ST be necessary, the new TD would be *.450' from the permitted TD of the
original bore. The target penetrations would be the same.
Please note the following attachments:
1. Wellbore Diagram if the Clean-out is Successful
2. The Sidetrack Directional Plan If it is required.
3. Wellbore Diagram for the Sidetracked Well.
Well P2-11 will have a 7" intermediate string top-setting the Kuparuk with a 6" productio~r~o
bore completed with a 4 Y~" solid cemented liner.
Please call me at 564-4191 or 688-4622 at home if more information is needed, or you have
any questions, A 403 and any other required paperwork will follow on Monday,
I I I I I I II I
WELLHEAD: 11" x 11" - 5M FMC GL-SL = 11.G'
/
I I ~ .o ~ TVO I Twe
~ 2 i '"~
i ' I /
IMax An~lfi: 94~ ~ 15.0p0:, I ~ I I 5 ~ SPM
/
~ 7 I ~o MD
~ ~ above
~ i pckr
4-1/2" 12,6~ 13Cr, NSCT
3.958" ID 0.0152 bb~ Capac~.
Top of 7" 29~ Chris, 13,9~' ~~ 7", 26 ~T, LB0, BTC-M
/
Hange~ --
Peffor~n Summa~
Ref Log; -
, (to ~ pmv~ by Asset)
' ~41~" 12,8~/FT, 130r,
I I I I
Date Rev, ,, ByComments
" Point Mcln~re
10/1 g~8 G H Proposed Completion
...... WELL: P2-11
[
.... Shared Services Drilling
[, I I
GAS LIFT MANDREI'S
31/2" X 11/2"
MD TVD [ Twe
1 TBD TBD 4 1/2" x
2 11/2
3 Camo
4 MBX
5 SPM
6
7 40' MD
above
pckr
Size Interval SPi~ Open/Sqz(~
·
"'i (ST)
TREE= 4 1/16" - 5M Chrome
WELLHEAD: 11" x 11" - 5M FMC GL-SL -- 11.6'
Gert
5
Type i ~, ~ ~ I
, ~ 3-1/~ B,,~-O I :~,Ooo' "j
..............
9 5/8", 40 #/fl, US0 BTC I 5,742' ],~ i~I~i~!!~! k 4 1/2" X 1"
I II MD ~D I T~e
~ 1 ~ ~D TBD 41/2" x 1
' 2 Camco
3 MBX
I KOP: ~oo; - I 4 SPM
I Max Angle: 94° ~ 15,000'I 5 I
6
' 7 = 40' MD
L ~ above
, ~ pckr
3-1/2" 9.2¢ 13Cr, NSCT ~ ,
3.068" ID 0.00914 bbl/ft Capacity
I
~ 7", 26 ~/~, L80, BTC-M
Top of 7" 29~ Chrome, 13,9~' m~
I ' [
~ ~ z"x.-~/~".Cr..~k~l",~"~'J
BAKER Tie Back Sleeve ~
BAKER HMC Hanger 4-1/2" XN Nipp~ (3.725" I ~
F14,~°4' I-- ' ~ 4-1/2" Mule Shoel 14,~73' !
',
i ,
!
;
Pedoration Summary
Ref Log:
(to be provided by Asset)
Size In{e~al' ~SPF Open/Sqzd
~;,::~;:~:~S;>:~:<8~:~:.~:.;~ ~,:~;~.:SSS::~;~2~:::~~ ~'~
Plug Back Depth ~~ I ~.364' !
,, -..~ .... ' I , i
NSCT ' ~?: I lS.409' I
(3.958" ID, 0.01522 bbl/ff)
I i i
Date Rev By Comments
Point Mclntyre
9/16/98 GH Proposed Completion
..... WELL: P2-11
......
- ' Shared Services Drilling
I
GAS LIFT MANDRELS
4 1/2" X 1"
MD TVD ~ Type
I TBD TBD ¢1/2" x 1
2 Camco
3 MBX
4 SPM
5
6
7 40' MD
above
pckr
Size Interval SPF Open/Sqzd
Shared Services Drilling Alaska
Point Mclnlrye
Alaska State Plane Zone~ ;i.=, = ~oo,...~
Point LVlclntyre Pad 2
P2-11 (0) Wps
Ea~ngs
t DrillQues£
10200 1030~
[ [ I.,
~SOOO
4 1/2' Uner- ~0~.07 MD.
l~a~ D~31h: 1~40gq~ MI). ~ TVn
-](
-1100
! I I I I I [
9709 9800 9900 10000 10100 10200 10~00 zO40o
,~le'- linch = 100ft E~O~IS Refe~ea~ is T~a North
,v-'
?"Ca¢~ ~ 14~4~0 MI~ 1'VD
1 ~ ~ ~ ~ 15.5~: 14~.~MD, ~ ~ T?~Q~: ~ ~D, ~.~
- ~ / / ~ ~~~?~~ tan,~s~ /
........ ~[~ ............................................................................................. JSLR~.I~t~,~ l.~ .
7. . " .............................. ~O~J - .
............................................. ~ .............................................................................................................................
"~ I !~ I I I i I '
g75 0 ~50 9950 100~0 I 0150 10~0 10350
S~I~ linch = 10~ Ve~ical S~tton S~ A~h: ~4.769
Sperry-Sun Drilling Services
Proposal Report for P2-11 (0) Wps - P2~11St Wp1
Revised'. 16 Oeteber, 1998
Shared Services Drilling Alaska
Point Mclntrye
Measured Sub-Sea Ymlicat
Del:dh ~nct AzUre. Depth i]~epth
Lo=al Coo~dlnate~ Global ¢oordlr~elea Dagr~E Vedlcal
No, things Eastl.gs NorthJn~s Earrings Rate Saetfon
Alaska State Plane Zone 4
Point Mclntyre Pad 2
15259.87 I~e. OtiO 55.t~00 t~3~,00 ~96B,40
~5409.07 96.000 55.009 S920.00 898B,48
'i094.§1 S 9729.78 E 5997721.17 N 691 ~04.l~1E $7'87,12
1110~9 S D~.62 E SDD~I 0.14 N ~295~ E 1G.0~ 6976.G1
1089.20 S I 0~2~ E ~7~451 N ~41B.~ E ~5.5~ 10099.~
1061.31 S 101~ E ~~E N ~14~.~6 E 15.5~ 101~.~
I~D.~S 1014~ E ~9~87.~ N ~151Z95 E 15.1~ ~O191.~
9.5254 $ 10263,07 E 5997676.45 N ~91633.7~ £ 0.OE0 1~j06.74
86~.51 $ 10395.95 E ,5997965.44 N E;91754~4,~ E D.i~D 10422.03
Air data 'is in feet unless othenvise s~ted. Oir~-tions and coordinates are reJative to True Nor,h.
Verlica~ depths are relative to Well Northings and Eastings are relative to Well.
Mag ne~i¢ Declina~on at Surface is 0.090' (15-0ct-98)
The Dogleg Severity is in Degrees per 100E.
VeStal Sectio~ is from We[I and calculated along an Azimuth ot 94.76~= (True).
t~ased upon Minimum Curvature type calculations, at a Measured Depth of 15409.07ft.,
The Bottom Hole Displacement is 10422.03~, in the'Direction of 94.769° (Tree).
co~uecl, , .
TONY KNOWLE$, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
September 25. 1998
Lowell Crane
Drilling Engineering Supervisor
ARCO Alaska, Inc.
PO Box 196612
Anchorage, AK 99519-6612
Re:
Point McIntvre P2-11
ARCO Alaska, Inc.
Permit No: 98-192
Sur Loc: I~SL, 1115'EWL. SEC 11. TI2N, RI4E. UM
Btmhole Loc. 4238'NSL. 935'EWL. SEC 18. T12N. RI5E, UM
Dear Mr. Crane:
Enclosed is thc approved application for permit to drill thc above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by laxv from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations arc made.
Your request for a waiver of divertcr has been approved.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
ssion petroleum field inspector on thc North Slope pager at 659-3607.
David W. jo ston
Chairman ~
BY ORDER OF THE COMMISSION
dlffEnclosures
cc~
Department of Fish & Game. Habitat Section w/o cncl.
Department of Environmental Conservation w/o cncl.
STATE OF ALASKA
ALASKA ~ AND GAS CONSERVATION COM~iSSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work [] Drill [] Redrill lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] Deepen []Service [] Development Gas []Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska Inc. Plan RTE = 49.0' Point Mclntyre
3. Address 6. Property Designation
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL034627
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
1' NSL, 1115' EWL, SEC. 11, T12N, R14E, UM Point Mclntyre
At top of productive interval 8. Well Number Number U-630610
4181' NSL, 349' EWL, SEC. 18, T12N, R15E, UM P2-11
At total depth 9. Approximate spud date Amount $200,000.00
4238' NSL, 935' EWL, SEC. 18, T12N, R15E, UM 09/25/98
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and 'I-VD)
ADL034624 by 935'I P2-10, 8.11' at 601' MD 2560 15391' MD /9162' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
KickOff Depth 2216' MD Maximum HoleAngle 71.34° Maximum surface 3467 psig, At total depth (1-VD) 8800'/4347 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
30" 20" 133# H-40 BTC 80' 36' 36' 116' 116' Driven
12-1/4" 9-5/8" 40# L-80 BTC-Mod 5174' 35' 35' 5739' 4948' 1630 sx Coldset III, 470 sx Class 'G'
8-3/4" 7" 26# L-80 BTCM 11297' 34' 34' 14470' 8850' 321 Class 'G'
8-3/4" 7" 29# 13CR BTCM 1985' 14470' 8850' 15392' 9162'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented MD TVD
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
measured
.~- r,~,no ,'~.r~qiSS~,0~~
true vertical ^lssk~ 0i! & ,~s ~u,,o
Anchorage
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Justin Balkenbush, 564-5238'-~ Prepared By Name/Number: Carol Withey, 564-4114
21. I hereby certify that the,~regoing is trye and correct to the best of my knowledge
Signed
LowellCrane'~/~"~ /~"~""~"~ Title Drilling Engineering Supervisor Date ?
¢/- Commission Use Only
Permit Number I APl Number I A~:~~~ See cover letter
¢7~'-//¢ 2-- 50- ~.~. ~' -- 2. ~ ¢ ~__..~ for other requirements
Conditions of Approval: Samples Required []Yes .~No Mud Log Required []Yes J~No
Hydrogen Sulfide Measures []Yes [] No Directional Survey Required I~Yes I-I No
Required Working Pressure for BOPE []2M; F-I3M; ~j~5M; F'I10M; []15M
Other: Original Signed By
0avid W. J0hnst0n by order of
Approved By Commissioner the commission Date
'~iicate
Form 10-401 Rev. 12-01-85 SL
I Well Name: I P2-11
I Type of Well (producer or injector)' I Producer
Surface Location: 1' FSU 1115' FWL, T 12N, R 14E, S 11
Target Location: 4181' FSU 349' FWU T 12N, R 15E, S 18
Bottom Hole
Location:
I AFENumber: 12C0129 I
I Estimated Start Date: 19/25/98
11 39 ' I
4238' FSL, 935' FWL, T 12N, R 15E, S 18
I Rig: I NABORS 33E
I Days to complete I 25
Well Design (conventional, slimhole, etc.): I Ultra-Slimhole 7" Longstring, 3-1/2" 13 Cr I
I
tb9
I
Formation Markers:
Formation Tops MD TVD
Base of 1789' 1783'
Permafrost
SV4 3800' 3718'
SV1 (T3) 5393' 4738'
9 5/8" Casing 5739' 4948' 9-5/8" csg shoe below SVl & above
Point K-15
K15 (Ugnu) 6122' 5168'
West Sak 10497' 6988' 9.5 ppg minimum mud weight
required.
HRZ/K-10 13737' 8528' K-10/HRZ same depth. 9.6-9.9 EMW
to this depth. 3% 10.5 ppg KCI GEM
System at 500' ABOVE K-10. 10.5 for
the 70 degrees in the HRZ.
Kalubik 14617' 8908'
Kuparuk 14770' 8963'
OWC 15251' 9117'
TD 15391' 9162' 140' Md Below the OWC.
Casing/Tubing Proc~ ram:
Hol~ Cs~/Tbg' Wt/Ft Grade Conn Length Top Btm
Size O.D. MD/TVD MD/TVD
30" 20" 133# H40 BTC 80' 36'/36' 116'/116'
12 1/4" 9 5/8" 40# L-80 BTC-Mod 5174' 35'/35' 5739'/4948'
8 3/4" 7' 26# L-80 BTCM 11297' 34'/34' 14470'/8850'
8 3/4" 7" 29# 13 Cr BTCM 1985' 14470'/8850' 15392'/9162'
.. Tubing 3 1/2" 12,6# 13 Cr NSTC 11498' 33'/33' 14670'/8929'
Mud Program:
~urrace n~uo ~-roper[les: ~pua I i~ ix. no~e ~e(;uun
Density (ppg) Funnel Vis Yield Point 10 sec gel 10 min gel pH Fluid Loss
8.7-9.5 100-300 30-70 20-60 40-80 9-10 15 - 25cc
LSND [8 3/4" hole section
Production
Mud
Properties:
Density(ppg)lFunnelVis YieldPoint 10secgel lOmingelI
8.8-9.9 40-55 18-22 5-15 < 30
pH Fluid Loss
9.0-9.5 4-6cc
Production Mud Properties: 3% KCL 18-3/4" hole section, GEM
Density (ppg) Plastic Vis Yield Point 10 sec [10 min
gel I gel
10.5 8-15 15-25 8-15 < 30
I
pH Fluid Loss
9.0-9.5 <5cc
Cement Data:
Casing First Stage: Second Stage: Comments
Sxs/Wt/Yield Sxs/Wt/Yield
9-5/8" surface Coldset II1: 979/12.2/1.92 Two stage iob:
casing 651/12.2/1.92 (assumes 200% First stage Coldset III lead
to 5739'. excess in from 2000'-4660' @ 50%
ES cementer Class G: permafrost) excess followed by Class
@ at 2000' 470/15.8/1.15 G tail from shoe to 4660'
MD. (750' TVD) @ 50% excess
+ 80' shoe.
Second stage Coldset III
circulated to surface.
Casin~l/Liner Lead:Sxs/VVt/Yield Tail:Sxs/W~ield Comments
7" none 321/15.8/1.19 Class "G". Volume based
on cement to 1000' above
the Kuparuk with 50%
excess + 80' shoe.
Logging Program:
I Open Hole Logs:
Cased Hole Logs:
12 1/4" MWD/multi-shots as needed for directional survey.
MWD/LWD GR/RES to 500' above K-10.
MWD/LWD GR/RES/DEN/NEU (Triple Combo) to TD. Gyro if
requested.
GR/CBT-CET (contingent on cmt job mechanics).
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
It is requested that the diverter be waived for this well. The diverter would point at Manifold
buildings or other wells with the design of N-33E. There has never been any surface gas
reported in any of the PM-2 drilling programs. All 1998 wells have been drilled with no issues.
BOPE and drilling fluid system schematics are on file with AOGCC.
Directional:
KOP:
Maximum Hole Angle:
Close Approach Wells:
71.34
P2-09
P2-10
P2-12
P2-13
P2-17,
degrees
25.56' Allowable Deviation at 500' MD (SI thru SSSV)
8.11' Allowable Deviation at 601 'MD (SI thru SSSV)
9.03' Allowable Deviation at 582'MD (SI thru SSSV)
27.69' Allowable Deviation at 702'MD (SI thru SSSV)
P2-36, P2-37, P2-40, P2-42 Risk Based Close Approach (SI).
Drillinq and Completion Scope
1. Move rig to P2-11. NU riser and flowlines.
2. Drill 12-1/4" surface hole to 5739' MD.
3. Run and cement 9 5/8" casing. Cement to surface.
4. RIH with 8-3/4" bit, MWD DIR/LWD GR/Res to float collar.
5. PT casing to 3000 psi for 30 min. Record on chart.
d. Drill out 20', perform LOT. Record on chart.
?. Drill 8-3/4" production hole to 500' MD above the K-10. Trip and swap to LWD triple combo
BHA. Swap to 10.5 PPG 3% KCI/GEM system on this trip.
8. Drill 8-3/4" production hole to 15391' MD. PDC bits will be used to drill this section.
P. Perform a Wiper Trip.
10. Circulate and Condition Mud, POOH to Run 7" Longstring.
! 1. Run/cement 7" long string.
12. Circulate well to kill weight filtered brine. Perforate via DPC guns.
]3. Kill well, Run 3 1/2" 13Cr tubing with 7"x4 1/2" packer w/XO's, 3 1/2" SSSV, and 3 1/2"x11/2"
GLMs.
14. Secure well, RDMO.
Drilling Hazards/Contingencies
· The original reservoir pressure is 4377 psi at 8800' ss. The expected reservoir pressure is
4347 psi at 8800' ss. Abnormally pressured formations are not expected in this well. The
10.5 ppg mud will overbalance the anticipated pressure by 458 psi.
· Tight hole has been experienced in the lower Sagavanirktok, below the surface casing shoe
which were set into the SV4 sand. This has caused stuck pipe incidents and bit/BHA bailing
Gumbo problems.
· Coal stringers/SV Sands in the lower Ugnu have caused stuck pipe.
· No major instances of lost circulation problems have occurred on Pt Mac 2 wells.
Disposal
· Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for
injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from
drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the
North Slope Borough.
SK 09/18/98
TREE: 4-1/16"-5M chrom
WELLHEAD: 11" X 11" - 5M FMC
Gen 5 Type
9-5/8", 40#/ft, L-80 I 5739' I
BTC
(top
glm)
P2-11
RT-GL = 36.2'
GL-SL - 12.8'
3-1/2"TRDP4 I 2000 I
RP Shear in top station.
KOP: 2216'
MAX ANGLE: 71° @ 14770' MD
3 1/2" 12.6# 13 Cr NSCT TUBING
TUBING ID: 3.068"
CAPACITY: 0.00914 BBL/FT
PERFORATION SUMMARY:
Ref Log:
ISize ] Interval SPF Open/Sqzd
tbd
7", 26 & 29 #Iff,
L-80 Mod BTC / 13CR NSCT
(J^,5 LIP I MAINDPIEL;:::5
(Camco 3-1/2x1~1/2")
N-° MD(BKB) TVDss
tbd
II
40' MD above
packer
OF CHROME 7" = 14470 '
7" shoe at I 15391'
7" Packer,9Cr
3-1/2" 'X' Nipple
3-1/2" 'XN' Nipple
3-1/2" WLEG
· 7" CHROME
14640
14650'
14660'
14670
MARKER JOINT (20') ABOVE
KUPARUK BUT BELOW TT.
k
DATE
REV. BY
COMMENTS
9/18/98 SK PLANNED COMPLETION
Point Mclntyre
WELL: P2-11
APl NO: 50-029-
Shared Services Drilling
FAX NO, 1o075635754 P, 04/1
~pc::,m -~1_11":1 BP EXPLORATION (ALASKA) INC_.. Dr
~--~".~,I,~,?~...,.~,~.~,Y.~''"'~ Well: P2-11 (0) Wp1
0 ~ ~ ProposM Dala (or PZ.I 1 (O)¥/~1
Start Oir ~ 1,O00°/lO0[t: 400.O01t MD, 400.0OJt TVD~ v,~o~:
I
......... Eh~' b'ii: '2'1'~ 'f ~il'~4~)' ~'1'7'~ '9'9'fl ¥,~6 ......................... ~,,, ? ..... afro.,'t. 178& 40 ;['VI) ]~]~ }~:r~
/ //Sled Oir e 1.500°/100ft:2216,151! MD, 2209.99fITVD i ¢~'~I ¢[~ '~'~ ]~z~'~ ~]~']~] ~-~;~[ ~'-'2 [?-'. '
2 lC0.00 ,,/Dir Rate Increase @ 2.000°/1001~: 261&15fl MD, 2609.26fl TVD I~W~I
2800 ....~;JO0.00 l~L/Dir Rale Incroa$o @ 2.500°/100[t: 3023.98Jl MD, 3.010.59fl TVD
~ 3200.00 ~,
~" \ //Oir Ra~e Increase ~ 4.000'/lO0ft; 3679.09ft MD, 3616.2tll TVD
............ '~, ................................................................................................................................. $V4 IE~/im,wr]. $?/~ 40 ?'VD
"~ 4030.00%/End DIr: 42e7.39ft V,D, 4055.61R TVD
,~ .......... ~'~;o"¢~ ....................................................................................................................... To~ ~,,,~ v~/,, z~ .... .¢,~¥.~. ~o Tvr~
'ff...42 00 -- ~- ~ ~ o
~.~ 4800.0"0~,,. ~ail @ .2,650 Incliner'on on 100,000° Azimuth
5,~00 0
', ....... ~.'."Z'.~.~. · · .'":~, ...... .9.5/8:.Casi~., 5738,99 MD,. 4.94.8..40.;V.D ....................................................
560~0 )~OIIt)l~l Stuck Pq c Znne 4tn45~ 40 TV/;
............................. s so~.~~. :4~;;d '63'&' btaab'o3{ 6bi/; Yd/i.'o'gli 'fii~,'~bbb'.bb'~f ~,)b ...............................................
6000 0
6400'0 ~800.~~
5600 - 7200.~
¢ I 0400.~
~. ~oo.o~,,,.
'-~ 0 0 0 .......................... West ~nk . 6988.40 7'VD
~,~ ................. Top Coh'ille [ £stimnte ] - 7151.29 TVD
1 I 1 t 600.
~ -' I '1 ' - | ' I ' ' I '
0 t 400 2800 4200 5600 7000
Scale: linch = 140Oft Vertical Section Section Azimuth: 95.694' (True North)
~ 1 ~'OO.00
DRAFT ONLY
FOP, PEP, MlWiNG ONLY
~. 7" Casing - 15391.51 MD, 9162.19 TVD
~300 -I '
[ ...... I '1 1' I I ....
7500 8100 8700 9300 9900 10500
Scale: linch = 600ft Vertical Section Section Azimuth: 95.694° (True North)
, ,, , ,
Shared Services Drilling
I DrillQuest'
Point Mclntrye
Alaska State Plane Zone 4
Point Mclntyre Pad 2
P2-11 (O) Wp1
0 u
0 ~
~ .5oo -
Scale: I inch = 500ft Eastings
? o?o
Start Oi, cC 1.000°/100fl: 400.00tl MD. 400.00It IVD
End Dir: 1356.151! MD, 1352.88ft TVD
Sail @ 8,000° Inclination on 220.000° Azimuth
Start Dir @ 1.000°/100It: 1386.15~1 MD, 1382.5811TVD
End Dir: 2186.15ft MD, 2179.99fI'I'VD
Sa~ @ 0.000° Inclination on 1.391° Azimuth
Stad Oir @ 1.500°/100ft: 2216.15~I MD, :2209.99[t TVD
Dir Rate Increase @ 2.000°/100fi: 2616.15f1 MD. 2609.26ft 'IVD
q.,,oo.~ ~----~ Dir Pale Increase @ 2,500°/10011: 3023,9811 MD, 3010.59ft TVD
~9 "~-..,.,,..~_------ Dir Pale Increase @ 4.000°/10Oft: 3679.09ft MD, 3616.21 ~t TVD
~q?<3* ~ ~*~-'-.~_.____-~- End Oir: 4267.39/1 MD, 4055.61ft TVD
' ,~tour ^9° _ ~ _ Sail @ 52.650° lnclinalion on 100.000° Az~mu
~ ~. ~.~_~ .~-~ .....
_ 9 5/8' Casina - 5738.99 MD. 4948.40q-VD j
I I / I
0 500 1000 1500
Sca[e: linch = $00ft
Eastings
Reference is True North
-0
~ 0
~z
-500 ~-.
o
ORAFT ONLY
FOR pERMITtING ONE~
-600 -
O=
z~
~-1800 -
Scale: linch = IZOOft
18100 30100 4500 54100
9 5/8" Casing - 5738.99 MD, 4948.40 TVD
Start Dir @ 2,000'/100ft: 5824.04ft MD. 5000.0Ot! TVD
~ ~ ~ Bt-lA Tendency @ 0.1S,~°/100tt: 6589.04ft MD 5377.90h TVD
Eastings
ee~oo
78001 9qO0 10:~00
P2-O - C-~clt
8965.40
/092.6~S, 97~5~IE eo~.~ 7
~ ~ ~ ~ ~ Sail ~ 71.3
~ ~/ ~'/ }.q,, ' ,
/ / Sail O 66.74~ Indi~lion ~ 87.30
/
/
' EndDir' 1415488~MO 8726~ItWD
! 't I I I I I I
1800 3000
Scale: '1 inch = 1 200f't
4200 5400 $600 7800
Eastings
9000 10200
Reference is True North
- -600
Casing - 15391.51 MD, 9162.19 TVD
tel Dopt~: 15391.51ft MD, 9162.19ft 1-VD
1° Inclination on 84.386~ Azimu[h
16ft MD, 8953.40;t -I-VD
620.85ft MD, 8910.00ft TV[.)
AzirnuU'~
- -1800
Shared Services Drilling
Point Mcintrye
Measured
Depth
(ft)
Incl. Azim.
Sub-Sea
Depth
(fi)
Vertical
Depth
(ft)
0.00 0.000 0.000 -48.40 0.00
400.00 0.000 0.000 351.60 400.00
500.00 1.000 180.000 451.59 499.99
600.00 2.000 180.000 551.56 599.96
700.00 3.000 180,000 651.46 699.86
800.00 4.000 160.000 751.28 799.68
900.00 4.481 191.901 851.00 899.40
1000.00 5.114 201.188 950.65 999.05
1100.00 5.850 208,295 1050.20 1098.60
1200.00 6.655 213.754 1149.60 1198.00
1300,00 7.507 218.011 1248.84 1297.24
1356.15 8.000 220.000 1304.48 1352.88
1371.15 8.000 220.000 1319.33 1367.73
1386.15 8.000 220.000 1334.18 1382.58
1400.00 7,861 220.000 1347.90 1396.30
1500.00 6.861 220.000 1447.08 1495,48
1600.00 5.861 220.000 1546.46 1594,86
1700.00 4.861 220.000 1646.02 1694.42
1789.25 3.969 220.000 1735.00 1783.40
1800.00 3.861 220,000 1745.73 1794.13
1900.00 2.861 220.000 1845.56 1893.96
2000.00 1.861 220.000 1945.47 1993.87
2100.00 0.861 220.000 2045.44 2093.84
2186.15 0.000 0.000 2131.59 2179.99
2201.15 0,000 0.000 2146.59 2194.99
2216.15 0.000 0.000 2161.59 2209.99
2300.00 1.258 130.000 2245.43 2293.83
2400.00 2.758 130.000 2345.37 2393.77
2500.00 4.258 130.000 2445.18 2493.58
2600,00 5.758 130.000 2544.79 2593.19
18 September, 1998 - 14:36
Sperry-Sun Drilling Services
Proposal Report for P2-11 (0) Wp I
Local Coordinates
Northings Eastings
(ft) (ft)
0.00 N 0.00 E
0.00 N 0.00 E
0.87 S 0.00 E
3.49 S 0.00 E
7.85 S 0.00 E
13.96 S 0.00 E
21.27 S 0.81 W
29.24 S 3.22 W
37.89 S 7.25 W
47,19 S 12.88 W
57.16 S 20.13 W
63.04 S 24.90 W
64.64 S 26.24 W
66.24 S 27.58 W
67.70 S 28.81 W
77.52 S 37.04 W
86.00 S 44.17 W
93.16 S 50.17 W
98.43 S 54.59 W
98.99 S 55.06 W
103.48 S 58.83 W
106.64 S 61.48 W
108.46 S 63,00 W
108.95 S 63.42 W
108.95 S 63.42 W
108.95 S 63.42 W
109.54 S 62.72 W
111.80 S 60.03 W
115,73 S 55.35 W
121.34 S 48.66 W
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (ft) (°/100ft) (ft)
5998579,63 N 681350.56 E 0.00
5998579.63 N 681350.56 E 0.000 0.00
5998578.76 N 681350.58 E 1.000 0.09
5998576.14 N 681350.64 E 1.000 0.35
5998571.78 N 681350.75 E 1.000 0.78
5998565.68 N 681350.90 E 1.000 1.38
5998558.35 N 681350.27 E 1.000 1.31
5998550.32 N 681348.05 E 1.000 -0.30
5998541.58 N 681344.23 E 1.000 -3.45
5998532.14 N 681338.83 E 1.000 -8.14
5998522.00 N 681331.83 E 1.000 -14.36
5998516.01 N 681327.20 E 1.000 -18.52
5998514,37 N 681325.90 E 0.000 -19.70
5998512.74 N 681324.60 E 0.000 -20.87
5998511.25 N 681323.40 E 1.000 -21.95
5998501.24 N 681315.41 E 1.000 -29.17
5998492.58 N 681308.49 E 1.000 -35.42
5998485.28 N 681302.66 E 1.000 -40.68
5998479.91 N 681298.38 E 1.000 -44.55
5998479.33 N 681297.92 E 1.000 -44.97
5998474.75 N 681294.26 E 1.000 -48,27
5998471.53 N 681291.69 E 1.000 -50.59
5998469.68 N 681290.21 E 1.000 -51.93
5998469.17 N 681289.80 E 1.000 -52.30
5998469.17 N 681289.80 E 0.000 -52.30
5998469.17 N 681289.80 E 0.000 -52.30
5998468.60 N 681290.52 E 1.500 -51.54
5998466.41 N 681293.26 E 1.500 -48.64
5998462.59 N 681298.04 E 1.500 -43.59
5998457.15 N 681304.86 E 1.500 -36.38
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comment
Start Dir @ 1.000°/100ft ' 400.00ft MD, 400.00ft TVD
End Dir' 1356.15ft MD, 1352.88ft TVD
Sail @ 8.000° Inclination on 220.000° Azimuth
Start Dir @ 1.000°/100ft ' 1386.15ft MD, 1382.58[t TVD
Base Permafrost
End Dir' 2186.15ft MD, 2179.99ft TVO
Sail @ 0.000° Inclination on 1.391° Azimuth
Stad Dir @ 1.500°/100ft ' 2216.15ft MD, 2209.99ft TVD
·
Continued...
DrillQuest
m
cz:)
z
Sperry-Sun Drilling Services
Proposal Report for P2-11 (0) Wp I
Shared Services Drilling
Point Mclntrye
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
2616.15 6.000 130.000 2560.86
2700.00 7.618 126.252 2644.11
2800.00 9.574 123.444 2742.99
2900.00 11.545 121.585 2841.29
3000.00 13.524 120,262 2938.90
3023.98 14.000 120.000 2962.19
3100.00 15.819 117.853 3035.65
3200,00 18.236 115.670 3131.26
3300.00 20.672 113.985 3225.54
3400,00 23.122 112.642 3318.32
3500.00 25.581 111.543 3409.42
3600.00 28.046 110.626 3498.66
3679.09 30.000 110,000 3567.81
3700.00 30.786 109.435 3585.85
3800.00 34.575 107.056 3670.01
3900.00 38.402 105.095 3750.40
4000.00 42.256 103.441 3826.62
4100.00 46.131 102.016 3898.30
4200.00 50.021 100.765 3965.11
4255,57 52.189 100.130 4000.00
4267.39 52.650 100.000 4007.21
4500.00 52.650 100.000 4148.33
5000,00 52.650 100.000 4451.67
5045.72 52.650 100.000 4479.40
5392.64 52.650 100.000 4690.00
5500.00 52.650 100.000 4755.01
5574.16 52,650 100.000 4800.00
5738.99 52.650 100.000 4900.00
5824.04 52.650 100.000 4951.60
5900.00 54.169 100.000 4996.88
Local Coordinates
Northings Eastings
(ft)
2609.26 122,4o S
2692.51 128.51 s
2791.39 137.Ol s
2889.69 146.84 S
2987.30 157.97 S
3OLO.59 16o.83 S
3084.05 17o.27 S
3179.66 183.42S
3273.94 197.38 s
3366.72 212.11 s
3457.82 227.60 S
3547,06 243,81 S
3616,21 257.13 S
3634.25 260.70 S
3718,41 277,54 S
3798.80 293.96 S
3875.02 309.87 S
3946.70 325.19 S
4013.51 339.86 S
4048.40 347.70 S
4055,61 349.33 S
4196.73. ~.i!c:?.~ 381.44S
4500,07 450.46 S
4527.80 456.78 S
4738.40 504.69 S
4803.41 519.48 S
4848.40 529.72 S
4948.40 552.47 S
5000.00 564.22 S
5045.28 574.81 S
47.39W
39.55W
27.27W
11.80W
6.82 E
11.76 E
28.88 E
55.04 E
85.28 E
119.53 E
157.74 E
199.83 E
235.81E
245.77 E
297.05 E
354.19 E
416.90 E
484.89 E
557.81E
600.35 E
609.57 E
791.67 E
1183.10 E
1218.89 E
1490.65 E
1574.54 E
1632.59 E
1761.63 E
1828.22 E
1888.28 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (ft) (°nOOft) (ft)
5998456,11 N 681306.15 E 1,500 -35.01
5998450,20 N 681314.14 E 2.000 -26.61
5998442.00 N 681326.63 E 2.000 -13.54
5998432.55 N 681342.33 E 2.000 2.82
5998421.87 N 681361.22 E 2,000 22.46
5998419.13 N 681366.22 E 2.000 27.66
5998410.11 N 681383.57 E 2.500 45.64
5998397.60 N 681410.04 E 2.500 72.97
5998384.38 N 681440.60 E 2.500 104.44
5998370.48 N 681475.20 E 2.500 139.98
5998355.92 N 681513.78 E 2.500 179.54
5998340.74 N 681556.25 E 2.500 223.03
5998328.30 N 681592.54 E 2.500 260.16
5998324.98 N 681602.59 E 4.000 270.42
5998309.38 N 681654.26 E 4.000 323.12
5998294.36 N 681711.78 E 4.000 381.61
5998279.g7 N 681774.86 E 4.000 445.59
5998266.30 N 681843.20 E 4.000 514.76
5998253.41 N 681916.46 E 4.000 588.78
5998246.60 N 681959.17 E 4.000 631.88
5998245.19 N 681968.43 E 4.000 641.22
5998217.5t N 682151.25 E 0.000 825.61
5998158.01 N 682544.25 E 0.000 1221.96
5998152.57 N 682580.18 E 0.000 1258.20
5998111.26 N 682853.02 E 0.000 1533.37
5998098.51 N 682937.24 E 0.000 1618.31
5998089.69 N 682995.53 E 0,000 1677.09
5998070.07 N 683125.08 E 0,000 1807.75
5998059.95 N 683191.93 E 0,000 1875.18
5998050.82 N 683252.23 E 2.000 1935.99
18 September, 1998- 14:35
Alaska State Plane Zone 4
Point Mcintyre Pad 2
Comment
Dir Rate Increase @ 2.000°/100ft' 2616.15fl MD, 2609.26ft TVD
Dir Rate Increase @ 2.500°/100ft' 3023.98ft M D, 3010.59ff TVD
Dir Rate Increase @ 4.000°/100ft · 3679.09tt MD, 3616.21ft TVD
SV4 [Estimate]
Top Stuck Pipe Zone
End Dir' 4267.39ft MD, 4055.61ft TVD
Sail @ 52.650° Inclination on 100.000° Azimuth
T-3 (TT6 / SV1)
Bottom Stuck Pipe Zone
9 5/8" Casing
Start Dir @ 2.000°/lOOft ' 5824.04ft MD, 5000.OOft TVD
Continue d...
DriilQuest
CZ)
Shared Services Drilling
Point Mclntrye
Measured
Depth
Incl. Azim.
6000.00 56.169
6100.00 58.169
6122.51 58.619
6200.00 60.169
6300.00 62,169
6400.00 64,169
6500.00 66.169
6589.04 - 67.950
6600.00 67.937
6700.00 67.817
6800.00 67.698
6900.00 67.579
7000.00 67.460
7100.00 67.341
7200.00 67.222
7300.00 67.104
7400.00 66.986
7500.00 66.867
7600.00 66.749
7700.00 66.631
7800.00 66.514
7900,00 66.396
8000.00 66.279
8100.00 66.162
8200.00 66.045
8300.00 65.928
8400.00 65.811
8500.00 65.695
8600.00 65.578
8700.00 65.462
Sub-Sea
Depth
(ft)
18 Septe/r~ber, 1998 - 14:3G
Sperry-Sun Drilling Services
Vertical Local Coordinates
Depth Northings Eastings
(ft) (ft) (ft)
100.000 5053.99 5102.39 589.06 S 1969.11 E
100.000 5108,20 5156.60 603.65 S 2051.86 E
100.000 5120,00 5!.68.40 606.98 S 2070.74 E
100.000 5159.45 5207.85 618.56 S 2136.42 E
100.000 5207,67 5256.07 633.77 S 2222.69 E
100.000 5252,80 5301.20 649.27 S 2310.56 E
100.000 5294.80 5343.20 665.02 S 2399.93 E
100.000 5329.50 5377.90 679~6 S 2480.68 E
99.983 5333.62 5382.02 681.02 S 2490.69 E
99.823 5371.28 5419.68 696.96 S 2581.94 E
99.663 5409.13 5457.53 712.62 S 2673.17 E
99.503 5447,17 5495.57 728.02 S 2764.36 E
99.343 5485,41 5533.81 743.15 S 2855.51 E
99.182 5523.84 5572.24 758.01 S 2946.63 E
99.022 5562.46 5610.86 772.60 S 3037.71 E
98.860 5601.27 5649.67 786.92 S 3128.75 E
98,699 5640.27 5688.67 800.98 S 3219.75 E
98.537 5679.46 5727,86 814.76 S 3310.71 E
98.375 5718.84 5767.24 828.28 S 3401.63 E
98.213 5758.41 5806.81 841.53 S 3492.51 E
98,051 5798.17 5846.57 854.51 S 3583.34 E
97.888 5838.12 5886.52 867.22 S 3674.13 E
97,725 5878.25 5926.65 879.66 S 3764.88 E
97.561 5918.58 5966.98 891.83 S 3855.57 E
97.397 5959.08 6007.48 903.73 S 3946.22 E
97.233 5999.78 6048.18 915.36 S 4036.83 E
97.069 6040.66 6089.06 926.72 S 4127.38 E
96.904 6081.73 6130.t3 937.81 S 4217.88 E
96.740 6122.98 6171.38 948.63 S 4308.33 E
96.574 6164.42 6212.82 959.18 S 4398.73 E
Proposal Report for P2-11 (0) Wp I
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (ft) (°/~OOrt) (ft)
5998038.53 N 683333.39 E 2.000 2017.84
5998025.96 N 683416.46 E 2.000 2101.62
5998023,09 N 683435,42 E 2.000 2120,74
5998013.10 N 683501.36 E 2.000 2187.25
5997999,99 N 683587.97 E 2.000 2274.60
5997986.63 N 683676.20 E 2.000 2363.58
5997973.05 N 683765.93 E 2.000 2454.07
5997960.77 N 683847,00 E 2.000 2535.84
5997959.25 N 683857.04 E 0.190 2545.96
5997945,54 N 683948.66 E 0.190 2638.35
5997932.10 N 684040.24 E 0.190 2730.68
5997918.92 N 68413t.77E 0.190 2822.95
5997906.00 N 684223.27 E 0.190 2915.15
5997893.36 N 684314.72 E 0.190 3007.29
5997880.98 N 684406.12 E 0.190 3099.37
5997868.87 N 684497.49 E 0.190 3191.39
5997857.03 N 684588.80 E 0.190 3283.33
5997845.46 N 684680.07 E 0.190 3375.21
5997834.15 N 684771.29 E 0.190 3467.03
5997823.11 N 684862.47 E 0.190 3558.77
5997812.34 N 684953.59 E 0.190 3650.44
5997801.84 N 685044.66 E 0.190 3742.05
5997791.60 N 685135.68 E 0.190 3833.58
5997781.64N 685226.64 E 0.190 3925.03
5997771,94 N 685317.56 E 0.190 4016.42
5997762.51 N 685408.41 E 0.190 4107.72
5997753.35 N 685499.21 E 0.190 4198.96
5997744.46 N 685589.96 E 0.190 4290.11
5997735.84 N 685680.64 E 0.190 4381.19
5997727.48 N 685771.27 E 0.190 4472.19
-3-
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comment
UG4A (K-15)
BHA Tendency @ 0.190°/100ft - 6589.04ft MD, 5377.90ft TVD
Con tinued...
Dr~I/Quest
X
Z
Shared Services Drilling
Point Mcintrye
Measured
Depth Incl. Azim.
(ft)
~,,
~,, 8800.00 65.346 96,409
8900.00 65,230 96,243
9000.00 65.115 96,077
9100.00 64,999 95,910
9200.00 64,884 95,744
9300,00 64.769 95.576
9400.00 64.654 95.409
9500.00 64.540 95.241
9600.00 64.425 95.073
9700.00 64.311 94,905
9800.00 64.197 94,736
9900.00 64,083 94,567
10000.00 63.969 94.398
10100.00 63,856 94.228
10200.00 63,743 94. 058
10300.00 63,629 93.888
10400.00 63.517 93,717
10497.00 63.407 93,551
,,,,, 10500.00 63.404 93,546
10600.00 63.291 93,375
10700.00 63.179 93.203
10800.00 63,067 93.031
10858.13 63,002 92,931
10900.00 62.955 92,859
11000.00 62,844 92,686
11100.00 62.732 92.513
11200.00 62,621 92,340
11300.00 62,510 92,166
11400.00 62,399 91.992
11500.00 62.288 91,817
Sub-Sea
Depth
(ft)
Vertical
Depth
(ft)
Sperry-Sun Drilling Services
Local Coordinates
Northings Eastings
(rt)
Proposal Report for P2-11 (0) Wp I
6206.04 6254.44 969.46 S 4489.07 E
6247.85 6296.25 979.47 S 4579.36 E
6289.83 6338.23 989.21 S 4669.59 E
6332.01 6380.41 996.68 S 4759.77 E
6374.36 6422.76 1007.88 S 4849.89 E
6416.90 6465.30 1016.80 S 4939.95 E
6459.61 6508.01 1025.46 S 5029.95 E
6502.51 6550.91 1033.84 S 5119.89 E
6545.59 6593.99 1041.95 S 5209.77 E
6588.85 6637.25 1049.79 S 5299.59 E
6632.29 6680.69 1057.36 S 5389,34 E
6675.90 6724.30 1064.66 S 5479.03 E
6719.70 6768.10 1071.69 S 5568.66 E
6763.68 6812.08 1078.44 S 5658.22 E
6807.83 6856.23 1084.92 S 5747.71 E
6852.16 6900.56 1091.13 S 5837.13 E
6896.66 6945.06 1097.07 S 5926.48 E
6940.00 6988.40 1102.57 S 6013.09 E
6941.3~ 6989.74 1102_74 S 6015.76 E
6986.20 7034.60 1108.14 S 6104.98 E
7031.23 7079.63 1113.26 S 6194.12 E
7076.44 7124.84 1118.11 S 6283.18 E
7102.80 7151.20 1120.80 S 6334.92 E
7121.82 7170.22 1122.69 S 6372.17 E
7167.38 7215.78 1126.99 S 6461.09 E
7213.11 7261.51 1131.03 S 6549.93 E
7259.01 7307.41 1134.79 S 6638.69 E
7305.08 7353.48 1138.28 S 6727.38 E
7351.33 7399.73 1141.49 S 6815.98 E
7397.75 7446.15 1144.44 S 6904.51 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (ft) (°/~00ft) (ft)
5997719.40 N
5997711.58 N
5997704.04 N
5997696,76 N
5997689.75 N
5997683.02 N '
5997676.55 N
5997670.35 N
5997664.42 N
5997658.76 N
5997653.37 N
5997648.26 N
5997643.41 N
5997638.83 N
5997634.52 N
5997630.48 N
5997626.71 N
5997623.31 N
5997623.21 N
5997619.98 N
5997617.03 N
5997614.34 N
5997612.90 N
5997611.92 N
5997609.77 N
5997607.90 N
5997606.29 N
5997604.96 N
5997603.89 N
5997603.10 N
685861.63 E 0.190 4563,10
685952.34 E 0.190 4653,94
686042.78 E 0,190 4744.69
686133.16 E 0,190 4835.37
686223.48 E 0.190 4925,95
686313.73 E 0,190 5016.46
686403.92 E 0,190 5106.87
686494,04 E 0.190 5197.20
686584.09 E 0.190 5287.44
686674.07 E 0.190 5377.60
686763,98 E 0,190 5467.66
686853.82 E 0,190 5557.63
686943.59 E 0.190 5647.51
687033.28 E 0,190 5737.29
687122.90 E 0,190 5826.99
687212.45 E 0,190 5916.58
687301.92 E 0,190 6006.09
687388.63 E 0,190 6092.81
687391.32 E 0,190 6095.49
687480.63 E 0.190 6184.80
687569.87 E 0,190 6274.00
687659.03 E 0.190 6363.11
687710.81 E 0,190 6414.86
687748,10 E 0.190 6452.12
687837.10 E 0,190 6541.02
687926.01 E 0.190 6629.83
688014.84 E 0.190 6718.52
688103.58 E 0.190 6807.12
688192.24 E 0.190 6895.61
688280.81 E 0.190 6983.99
Comment
West Sak
Top Colvi[le [Estimate]
Alaska State Plane Zone 4
Point Mclntyre Pad 2
18 Septen!b~,r, 1998 - 14:37
.-
-4-
Con tinued...
DrillOlxes t
Sperry-Sun Drilling Services
Proposal Report for P2-11 (0) Wp I
Shared Services Drilling
Point Mclntrye
Measured
Depth Incl.
11600.00 62.178
11700.00 62.068
11800.00 61.958
11900.00 61.848
12000.00 61.739
12100.00 61.630
12200.00 61.521
12300.00 61.412
12400.00 61.303
12500.00 61.195
12600.00 61.087
12700.00 60.979
12800.00 60.872
12900.00 60.764
13000.00 60.657
13100.00 60.550
13200.00 60.443
13300.00 60.337
13400.00 60.231
13500.00 60.125
13600.00 60.019
13700.00 59.914
13737.5¢ 59.874
13800.00 59.809
13900.00 59.704
13919.53 59.683
14000.00 62.097
14100.00 65.096
14154.88 66.742
14160.96 66.742
Azim.
Sub-Sea
Depth
(ft)
Vertical
Depth
Local Coordinates
Northings Eastings
(ft) eft)
91.643 7444.33 7492.73 1147.11 S
91.468 7491.09 7539.49 1149.51 S
91.292 7538.02 7586.42 1151.63S
91.116 7585.11 7633.51 1153.49 S
90.940 7632.38 7680.78 1155.07 S
90.763 7679.61 7728.21 1156.38 S
90.586 7727,41 7775.81 1157.41 S
90.409 7775.18 7823.58 1158.18 S
90_231 7823.11 7871.51 1158.67 S
90.053 7871.21 7919.61 1158.89 S
1';~:';' ~
89.875 7919.48 7967.~8 1158.83 S
89.696 7967.91 8016.31 1158.50 S
89.517 8016.50 8064.90 1157.90 S
89.337 8065.26 8113.66 1157.03 S
89.157 8114.19 8162.59 1155.88 S
88.977 8163.27
88.797 8212.52
88.615 8261.93
88.434 8311.50
88.252 8361.23
8211.67 .... v 1154.47 S
8260.9--~- L''- 1152.78S
8310.33 1150.81 S
8359.90 I148.58 S
8409.63 1146.07 S
88.070 8411.t2 8459.52 1143.29 S
87.887 8461.17 8509.57 1140.23 S
87.819 8480.00 8528.40---- 1139.02 S
87.704 8511.38 8559.78 1136.91 S
87.521 8561.75 8610.15 1133.31 S
87.485 8571.60 8620.00 1132.58 S
87.419 8610.75 8659.15 1129.45 S
87.341 8655.21 8703.61 1125.36 S
87.300 8677.60 8726.00 1123.01 S
87.300 86~0.00 8728.40 1122.75 S
6992.95 E
7081.32 E
7169.60 E
7257.79 E
7345.90 E
7433.93 E
7521.87 E
7609.72 E
7697.48 E
7785.15 E
7872,73 E
7960.22 E
8047.62 E
8134.92 E
8222.13 E
8309.24 E
8396.26 E
8483.18 E
8570.00 E
8656.72 E
8743.34 E
8829.86 E
8862.31E
8916.28 E
9002.59 E
9019.43 E
9089.67 E
9179.13 E
9229.18 E
9234.75 E
18 Septembe.C, 19.98- I4:37
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (ft) (°/lOOff) (ft)
5997602.57 N 688369.29 E 0.190 7072.26
5997602.32 N 688457.69 E 0.190 7160.43
5997602.34 N 688545.99 E 0,190 7248.48
5997602.62 N 688634.21 E 0.190 7336.43
5997603.18 N 688722.33 E 0.190 7424.26
5997604.01 N 688810.36 E 0.190 7511.98
5997605.11 N 688898.30 E 0.190 7599.59
5997606.48 N 688986.14 E 0.190 7687.08
5997608.12 N 689073.89 E 0.190 7774.46
5997610.03 N 689161.54 E 0.190 7861.72
5997612.21 N 689249.10 E 0.190 7948.86
5997614.66 N 689336.55 E 0.190 8035.88
5997617.38 N 689423.91 E 0.190 8122.79
5997620.37 N 689511.16 E 0.190 8209.58
5997623.63 N 689598.32 E 0.190 8296.24
5997627.16 N 689685.37 E 0.190 8382.78
5997630.96 N 689772.32 E 0.190 8469.20
5997635.04 N 689859.17 E 0.190 8555.50
5997639.38 N 689945.91 E 0.190 8641.67
5997643.99 N 690032.54 E 0.190 8727.71
5997648.87 N 690119.07 E 0.190 8813.63
5997654.03 N 690205.49 E 0.190 8899.42
5997656.03 N 690237.91 E 0.190 8931.59
5997659.45 N 690291.80 E 0.190 8985.08
5997665.14 N 690378.00 E 0.190 9070.61
5997666.28 N 690394.82 E 0.190 9087.30
5997671.11 N 690464.96 E 3.000 9156.88
5997677.38 N 690554.30 E 3.000 9245.49
5997680.93 N 690604.27 E 3.000 9295.06
5997681.33 N 690609.84 E 0.000 9300.58
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comment
CM3 (K-10)
Start Dir @ 3.000°/100ft · 13919.53ft MD, 8620.00ft TVD
End Dir - 14154.88rt MD, 8726.00ft TVD
THRZ
Continued...
DriflOuest
Sperry-Sun Drilling Services
Proposal Report for P2-11 (0) Wp1
Shared Services Drilling
Point Mclntrye
Measured
Depth Incl. Azim.
fit)
14387.86 66.742 87.300
14500.00 66.742 87.300
14616.80 66.742 87.300
14620.85 66.742 87.300
14700.00 69. I74 85.733
14770.16 71.341 84.386
14935.19 71.341 84.386
15000.00 71.341 84.386
15067.09 71.341 84.386
15100.23 71.341 84.386
15251.51 71.341 84.386
15391.51 - 71.341 84.386
Sub-Sea Vertical Local Coordinates
Depth Depth Northings Eastings
(ft) (ft) fit) (ft)
8769.60 8818.00 1112.93 S 9442.99 E
8813.88 8862.28 1108.08 S 9545.90 E
8860.00 8908.40 1103.02 S 9653.09 E
8861.60 8910.00 1102.85 S 9656.81 E
8891.30 8939.70 1098.38 S 9730.03 E
8915.00 8963.40 1092.69 S 9795.81E
8967.80 9016.20 1077.39 S 9951.42 E
8988.53 9036.93 1071.38 S 10012.53 E
9010.00 9058.40 1065.17 S 10075.79 E
9020.60 9069.00 1062.09 S 10107.03 E
9069.00 9117.40 1048.07 S 10249.67 E
9113.79 9162.19 1035.10 S 10381.68 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
fit) (ft) (°/100ft) (ft)
5997696.20 N
5997703.55 N
5997711.21N
5997711.47 N
5997717.71N
5997725.00 N
5997744.07 N
5997751.56 N
5997759.31N
5997763.14 N
5997780.62 N
5997796.79 N
Ali data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and East/rigs are relative to Well.
..,~' Dogleg Severity is in Degrees per 100ft.
Veal/cai Section is from Well and calculated along an Azimuth of 95.694° (True).
690817.78 E 0.000
690920.54 E 0.000
691027.58 E 0.000
691031.29 E 0.000
691104.38 E 3.579
691170.00 E 3.579
691325.19
691386.1~
691449.23
691480.39
691622.65
691754.30
~/_) ':'j ,:?
E 0.000
E 0.000
E 0.000
E 0.000
Based upon Minimum Curvature type calculations, at a Measured Depth of 15391.51ft.,
The Bottom Hole Displacement is 10433.15ft., in the Direction of 95.694° (True).
o.0oo
o.0o0
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comment
9506.82 Sail @ 66.742° Inclination on 87.300° Azimuth
9608.74
9714.90-. Kalubik
9718.58 Start Dir @ 3.579°/100ft: 14620.85ft MD, 8910.00ft TVD
9790.99
9855.89
10009.21
10069.42
10131.75
10162.54
End Dir- 14770.16ft MD, 8963.40ft TVD --
TKuparuk
argel: P2-O, 200.00 Radius., Geological
Sail @ 71.341 ° Inclination on 84.386° Azimuth
Miluveach
'T /2-
10303.08
10433.15
WOC
Tarqet: 15391.51fl MD, 9162.19ff 'rVD
Casing
t
/?
c
I8 SeptemOer, 199~t - 14:37
-6-
Continued...
[?r/I/Quest
IWell Name: I -11
I Type of Well (producer or injector):
IPr°ducer I
Surface Location: 1' FSL, 1115' FWU T 12N, R 14E, S 11
Target Location: 4181' FSU 349' FWU T 12N, R 15E, S 18
Bottom Hole 4238' FSU 935' FWU T 12N, R 15E, S 18
Location:
AFE Number: 1 2C0129 I
I Estimated Start Date: J 9/25/98 I
I Rig: I NABORS33E
I Days to complete
125
I RTE: 149,0
IWell Design (conventional, slimhole, etc.):
Ultra-Slimhole 7" Longstring, 3-1/2" 13 Cr
tbg
Formation Markers:
Formation Tops MD TVD
Base of 1789' 1783'
Permafrost
SV4 3800' 3718'
SVl (T3) 5393' 4738'
9 5/8" Casing 5739' 4948' 9-5/8" csg shoe below SVl & above
Point K-15
K15 (Ugnu) 6122' 5168'
West Sak 10497' 6988' 9.5 ppg minimum mud weight
required.
HRZ/K-IO 13737' 8528' K-IO/HRZ same depth. 9.6-9,9 EMW
to this depth, 3% 10.5 ppg KCI GEM
System at 500' ABOVE K-lO, 10.5 for
the 70 degrees in the HRZ.
Kalubik 14617' 8908'
Kuparuk 14770' 8963'
OWC 15251' 9117'
TD 15391' 9162' 140' Md Below the OWC.
Casing/Tubing Pro~ ram:
Hole Csg/Tbg Wt/Ft Grade Conn Length Top Btm
Size O.D. MD/TVD MD/TVD
30" 20" 133# H40 BTC 80' 36'/36' 116'/116'
12 1/4" 9 5/8" 40# L-80 BTC-Mod 5174' 35'/35' 5739'/4948'
8 3/4" 7" 26# L-80 BTCM 11297' 34'/34' 14470'/8850'
8 3/4" 7" 29# 13 Cr BTCM 1985' 14470'/8850' 15392'/9162'
Tubing 3 W' 12.6# 13 Cr NSTC 11498' 33'/33' 14670'/8929'
Mud Program:
Surface Mud Properties: Spud 112 1/4" hole section
Density (PPg) ~unnel Vis r Yield Point 10 sec gel I10 min gelj
8.7-9.5 ! 100-300 30-70 20-60 40-80
pH Fluid Loss
9-10 15 - 25cc
Production Mud Properties: LSND 18 3/4" hole section
Density(ppg) FunnelVis YieldPoint I10secgelll0mingell
8.8-9.9 40-55 18-22I I 15-15 < 30
Production Mud Properties: 3% KCL 18-3/4" hole section, GEM
Density (ppg) Plastic Vis Yield Point 10 sec 10 min
gel gel
10.5 8-15 15-25 8-15 < 30
pH Fluid Loss
9.0-9.5 4-6cc
pH
9.0-9.5
I
Fluid Loss
<5cc
Cement Data:
Casing First Stage: Second Stage: Comments
Sxs/Wt/Yield Sxs/Wt/Yield
9-5/8" surface Coldset II1: 979/12.2/1.92 Two stage job:
casing 651/12.2/1.92 (assumes 200% First stage Coldset III lead
to 5739'. excess in from 2000'-4660' @ 50%
Class G' permafrost) excess followed by Class
470/15.8/1.15 G tail from shoe to 4660'
(750' TVD) @ 50% excess
+ 80' shoe.
Second stage Coldset III
circulated to surface.
Casing/Liner Lead:Sxs/Wt/Yield Tail:Sxs/Wt/Yield Comments
7" none 321/15.8/1.19 Class "G" Volume based
on cement to 1000' above
the Kuparuk with 50%
excess + 80' shoe.
Logging Program:
I Open Hole Logs:
I Cased Hole Logs:
12 1/4" MWD/multi-shots as needed for directional survey.
MWD/LWD GR/RES to 500' above K-10.
MWD/LWD GR/RES/DEN/NEU (Triple Combo) to TD. Gyro if
requested.
GR/CBT-CET (contingent on cmt job mechanics).
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
It is requested that the diverter be waived for this well. The diverter would point at Manifold
buildings or other wells with the design of N-33E. There has never been any surface gas
reported in any of the PM-2 drilling programs. All 1998 wells have been drilled with no issues.
BOPE and drilling fluid system schematics are on file with AOGCC.
Directional:
KOP:
Maximum Hole Angle:
Close Approach Wells:
2216h.~-5' MD
71.34 degrees
P2-09 25.56' Allowable Deviation at 500' MD (SI thru SSSV)
P2-10 8.11' Allowable Deviation at 601'MD (SI thru SSSV)
P2-12 9.03' Allowable Deviation at 582'MD (SI thru SSSV)
P2-13 27.69' Allowable Deviation at 702'MD (SI thru SSSV)
P2-17, P2-36, P2-37, P2-40, P2-42 Risk Based Close Approach (SI).
Drilling and Completion Scope
1. Move rig to P2-11. NU riser and flowlines.
2. Drill 12-1/4" surface hole to 5739' MD.
3. Run and cement 9 5/8" casing. Cement to surface.
4. RIH with 8-3/4" bit, MWD DIR/LWD GR/Res to float collar.
5. PT casing to 3000 psi for 30 min. Record on chart.
d. Drill out 20', perform LOT. Record on chart.
?. Drill 8-3/4" production hole to 500' MD above the K-10. Trip and swap to LWD triple combo
BHA. Swap to 10.5 PPG 3% KCI/GEM system on this trip.
8. Drill 8-3/4" production hole to 15391' MD. PDC bits will be used to drill this section.
P. Perform a Wiper Trip.
10. Circulate and Condition Mud, POOH to Run 7" Longstring.
11. Run/cement 7" long string.
12. Circulate well to kill weight filtered brine. Perforate via DPC guns.
13. Kill well, Run 3 1/2" 13Cr tubing with 7"x4 1/2" packer w/XO's, 3 1/2" SSSV, and 3 1/2"x11/2"
GLMs.
14. Secure well, RDMO.
Drilling Hazards/Contingencies
· The original reservoir pressure is 4377 psi at 8800' ss. The expected reservoir pressure is
4347 psi at 8800' ss. Abnormally pressured formations are not expected in this well. The
10.5 ppg mud will overbalance the anticipated pressure by 458 psi.
· Tight hole has been experienced in the lower Sagavanirktok, below the surface casing shoe
which were set into the SV4 sand. This has caused stuck pipe incidents and bit/BHA bailing
Gumbo problems.
· Coal stringers/SV Sands in the lower Ugnu have caused stuck pipe.
· No major instances of lost circulation problems have occurred on Pt Mac 2 wells.
Disposal
· Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for
injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from
drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the
North Slope Borough.
SK 09/18/98
.................................. ~nn r~u, iouluuo;.,]~':JH K, Uq/lq
sJ:3mm~/-suI~I BP EXPLORATiON (ALASKA)/NC. DrillQuesf
~-""'~.".,.I,2~?.-".,~'~/~~'~ Well: P2-11 (0) Wp1
,,, , ,
0 -- I ~ Proposal Data for P2-11 (O)
Start Dir @ ~.000°/1001t: 400.00it MD, 400.00It WI:) v~o~4~: w,, --
I~e,'~,a~ C~;~h: Wo~l ,
4:)0.00 ~ M'~.~me~,r~:,'l, ,
~k~JI P. ol~oc~:~: True
--
v~,,.~.~ :s e~1 A ~rr~lh:
Ve.~,~c. al ~ [~ .x~'~ ~,~. weP
. End Dh': ~356.15ft MD 1352.88it TVD ['-- __ __ , .....
1 ~oo 00 :/Sail ~ 8.000° inclination on 220.000° Azimuth ~,~o o~ ~.~ ~ --;'-~,,~ ~.;,
:/- Start DIr @ 1,00O°/100ll: 1386.15[t MD 1382,58[t TVD ,<~.~ ~,~ ~oc~ ~,~.~ ~.%s ~¢~ ; ;: ~..-'~,
1 400 ~]~,.~$ i 0,33 2 ~.~x~ i3~ s~ ~.;~ .~
2616.l$ 60g13 I]~_O(X) ~.2~ 1~2 ~lO $ 41.)~ W -3~.,:; ! ~:~3
..................................................................... ~ri.¥¢ P¢~7~(Ifro~'l 178~4OTVI) 3o~.1~: 14z~x~ 12o. ooo ~lg.~ 1~3.I35 Ii
· './' , ' ~. 3~9 ~ ~o(3~o l&ooo 3~ ~1 ~s~ ~', s
End Dff ' 2186 1 §It MD 2179 ggft TVD t ..........
2[0000, / Sail @ 0.000° Indlnaton on 1,391° Azmuth s~o~ s~s0 (,o~ s~.~ ~.~.~
//Stall Dir @ 1 500/100fl · 2216 151! MD 2209 9g [TVD ~ ¢'~1 s~ ~t.s ~ ' °' '~' :'-' '~'"
2, 00.00 '1 / Dir Rate Increase @ 2.000°/100ti: 2616.15ft MD, 2609.26ft TVD J~:~'[~ ~:.~:J :l~r~ "~:~ :~.~ ~ ,}~}~.g} ~ ~}',[~.'~, ~:.~
I
2800 .~t00.00 VDir Rate Increase @ 2.500°/100Il: 3023.g8[I MD, 3010.5ell TVD
3200.00 l~k
............ ~- ................................................................................................................................ SW IEsfimm..J . $?~$ xO TVI)
................... ~ ...... O.~l~'.G~r~., S73~.~ ~I~.4048,40. T. VD .................................................... r.~ rrr~ / sw ~ .
.................. ~rm. n~a~ ......................................................................................................... Bt~tto~n Stuck Pi
: §400.0~
...... · ............ To/) Colvillc [£.~-t[~l~fl~ ] . ?J $ !.~9 TVD
I I 1 t
0 t 400 2800 4200 5600 7000
Scale: linch = 1400ft Medical Section section Azimuth: 95.694' (True North)
~1~00.00
12500.0012700.~
° FOR PERMITriNG ONLY
'~ VD
i700 .
~. 7" Casing - 15391.51 MD, 9162.19 TVD
~9300 -
~ ,,, , , ,
I" I I I I
7soo e.~ oo s7oo 9300 99oo '~ osao
Scale: linch = 60Oft Vertical Section section Azimuth: 95.694' (True North)
=,
Shared Services Drilling
} DrillQuest'
Point Mclntrye
Alaska State Plane Zone 4
Point Mclntyre Pad 2
P2-11 (O) Wp1
0 ~
Scale: linch = 500ft
Scale: linch = 500ft Eastin§s
/ Start Dir cc ~.000°/100fl: 400.00tlMD, 400.00ftTVD
// Encl DiF: ~ 356.1Stt MD, '1352.$8lt TVD
// Sail @ 8.000° Inclination on 220.000° Azimuth
~.~ S~art Dir @ 1.000°/10011: 138§.15fl MD, I382.58fl TVD
~ End Dir: 2186.15ft MD, 2179.99ft TVD
]~--~ Sail @ 0,000~ Inclination on 1.391° Azimuth
Start Dir @ 1.500°/100ff: 2216.15fl MO, 2209.9§~ TVD
Dir R~te Increase @ 2.000°/100ft: 2616.15fl MD, 2609.26ft'fVD
q.~,~.~'~,,,,~__-'~'-- Dir Rate lncma.se @ 2.500*/10011: 3023.98[t MD, 3010.5911TVD
~ ~ Dir R.~le Increase @ 4.000°/100ft: 3679.09ft MD, 3616.21[t TVD
~'~' ,cp.~ _~""""-.--~...~ End Dir: 4257.39[t MD, 4055.611t'TVD
- "~b~ ~'c~O c:? ~~"""'e'~"""'~ S~[I @ 52.650° Inclination on 100.000° Azimu
cO 5/$' Casi?o - ,,G7~1~1.90 MD, 494~.4Q*'rVD
I
i
0 500 1000 1500
_ ,, =~=as*in~,s Reference is True North
-0
-500 ~-
DRAFT ONLY
FOR pEPJ~i~ING
-600 -
~-1800 -
o
Scale: linch = 1200ft
18100 3Op0 4500 54~)0
9 5/8" Casing - 5738.99 MD, 4948.40 TVD
Star1 Dir @ 2.000°/100ft: 5824.04f! MD, 5000.00R TVD
~ / BHATendency @ 0.190°/100/1:6589.04ftMD, 5377.90flTVD
Eastings
66100
P2-O . C'~rctt
8965.40 TVD
1092.69 S, 97~5.81 E
?
/ Sail O 66.74~ Inclination on 87.30
/ EndOir 14154~8, MO 8726~11WD
I BO0 3000 4200 5400
Scale: linch = 1200ft
I
6600
Eastings
I
7800
I I
9000 10200
Referenceis True North
- -600
Casing - 15391.51 MD, 9162.19 TVE
.ia1 Oept~i: 15391.51 fl MD. 9162.19fi TVD
[1 ° Inc~nation on 84.386~ Azimuth
I6ff MD, 8953_40~ TVO
620.85ft MD, 8gl0.00ft TVD
,° Azimuth
- -1800
:><:
CZ)
Shared Services Drilling
Point Mclntrye
Measured
Depth
;~ (ft)
Incl. Azim.
Sub-Sea
Depth
(fi)
Sperry-Sun Drilling Services
Vertical Local Coordinates
Depth Northings Eastings
(ft) (ft) (ft)
0.00 0.000 0.000 -48.40 0.00
400.00 0.000 0.000 351.60 400.00
500.00 1.000 180.000 451.59 499,99
600.00 2.000 180.000 551.56 599.96
700.00 3.000 180.000 651.46 699.86
800.00 4.000 180.000 751.28 799.68
900.00 4,481 191.901 851.00 899.40
1000.00 5,114 201.188 950.65 999.05
1100.00 5.850 208,295 1050.20 1098.60
1200.00 6.655 213,754 1149.60 1198.00
1300.00 7.507 218.011 1248.84 1297.24
1356.15 8.000 220.000 1304.48 1352.88
1371.15 8.000 220.000 1319.33 1367.73
1386.15 8.000 220.000 1334.18 1382.58
1400.00 7.861 220.000 1347.90 1396.30
1500.00 6.861 220.000 1447.08 1495.48
ii 1600.00 5.861 220.000 1546.46 1594.86
..
1700.00 4.861 220.000 1646.02 1694-42
1789.25 3.969 220.000 1735.00 1783.40
1800.00 3.861 220.000 1745.73 1794.13
1900.00 2.861 220.000 1845.56 1893.96
2000.00 1.861 220.000 1945.47 1993.87
2100.00 0.861 220.000 2045.44 2093.84
2186.15 0.000 0.000 2131.59 2179.99
2201.15 0.000 0.000 2146.59 2194.99
2216.15 0.000 0.000 2161.59 2209.99
2300.00 1.258 130.000 2245.43 2293.83
2400.00 2.758 130.000 2345.37 2393.77
2500.00 4.258 130.000 2445.18 2493.58
2600.00 5.758 130.000 2544.79 2593.19
18 S~ptember, 1998 - 14:36
Proposal Report for P2-11 (0) Wp I
0.00 N 0.00 E
0.00 N 0.00 E
0.87 S 0.00 E
3.49 S 0.00 E
7.85 S 0.00 E
13.96 S 0.00 E
21.27 S 0.81 W
29.24 S 3.22 W
37.89 S 7.25 W
47.19 S 12.88 W
57.16 S 20.13 W
63.04 S 24.90 W
64.64 S 26.24 W
66.24 S 27.58 W
67.70 S 28.81 W
77.52 S 37.04 W
86.00 S 44.17 W
93.16 S 50.I7 W
98.43 S 54.59 W
98.99 S 55.06 W
103.48 S 58.83 W
106.64 S 61.48 W
108.46 S 63.00 W
108.95 S 63.42 W
I08.95 S 63.42 W
108.95 S 63.42 W
109.54 S 62.72 W
111.80 S 60.03 W
115.73 S 55.35 W
121.34 S 48.66 W
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (ft) (°/100ft) (ft)
5998579.63 N 681350.56 E 0.00
5998579.63 N 681350.56 E 0.000 0.00
5998578.76 N 681350.58 E 1.000 0.09
5996576.14 N $81350.64 E 1.000 0.35
5998571.78 N 681350,75 E 1.000 0.78
5998565.68 N 681350.90 E 1.000 1.38
5998558.35 N 681350.27 E 1.000 1.31
5998550.32 N 681348.05 E 1.000 -0.30
5998541.58 N 681344.23 E 1.000 -3.45
5998532.14 N 681338.83 E 1.000 -8.14
5998522.00 N 681331.83 E 1.000 -14.36
5998516.01 N 681327.20 E 1.000 -18.52
5998514.37 N 681325.90 E 0.000 -19.70
5998512.74 N 681324.60 E 0.000 -20.87
5998511.25 N 681323.40 E 1.000 -21.95
5998501.24 N 681315.41 E 1.000 -29.17
5998492.58 N 681308.49 E 1.000 -35.42
5998485.28 N 681302.66 E 1.000 -40.68
5998479.91 N 681298.38 E 1.000 -44.55
5998479.33 N 681297.92 E 1.000 -44.97
5998474.75 N 681294.26 E 1.000 -48.27
5998471.53 N 681291.69 E 1.000 -50.59
5998469.68 N 681290.21 E 1.000 -51.93
5998469.17 N 681289.80 E 1.000 -52.30
5998469.17 N 681289.80 E 0.000 -52.30
5998469.17 N 681289.80 E 0.000 -52.30
5998468.60 N 681290.52 E 1.500 -51.54
5998466.41 N 681293.26 E 1.500 -48.64
5998462.59 N 681298.04 E 1.500 -4.3.59
5998457.15 N 681304.86 E 1.500 -36.38
-1-
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comment
Start Dir @ 1.000°/100ft · 400.00ft MD, 400.00It TVD
End Dir: 1356.15ft MD, 1352.88ft TVD
Sail @ 8.000° Inclination on 220,000° Azimuth
Start Dir @ 1.000°/100ft - 1386.15ft MD, 1382.58[t TVD
Base Permafrost
End Dir' 2186.15ft MD, 2179.99ft TVD
Sail @ 0.000° Inclination on 1.391° Azimuth
Start Oir @ 1.500°/100ft- 2216.15fl MD, 2209.99ft TVD
·
Continued...
OrilfQuest
x
0
Shared Services Drilling
Point Mclntrye
Measured
Depth Incl. Azim.
~,, (~)
.Y
2616.15 6.000 130.000
2700.00 7.618 126.252
2800.00 9.574 123.444
2900.00 11,545 121.585
3000.00 13,524 120.262
Sub-Sea
Depth
(ft)
2560.86
2644.11
2742.99
2841.29
2938.90
Vertical
Depth
(ft)
2609.26
2692.51
2791.39
2889.69
2987.30
3023.98 14.000 120.000 2962.19 3010.59
3100.00 15.819 117.853 3035.65 3084.05
3200.00 18.236 115.670 3131.26 3179.66
3300.00 20.672 113.985 3225.54 3273.94
3400.00 23.122 112.642 3318.32 3366.72
3500.00 25.581 111.543 3409.42 3457.82
3600.00 28.046 110.626 3498.66 3547.06
3679.09 30.000 110.000 3567.81 3616.21
3700.00 30.786 109.435 3585.85 3634.25
3800.00 34.575 107,056 3670.01 3718.41
3900.00 38.402 105.095 3750.40 3798.80
~;4000.00 42.256 103.441 3826.62 3875.02
.,'
4100.00 46.131 102.016 3898.30 3946.70
4200.00 50.021 100.765 3965.11 4013.51
4255.57 52.189 100.130 4000.00 4048.40
4267.39 52.650 100.000 4007.21 4055.61
4500.00 52.650 100.000 4148.33 4196,73__..
5000.00 52.650 100.000 4451.67 4500.07
5045.72 52.650 100.000 4479.40 4,527.80
5392.84 52.650 100.000 4690.00 4738.40
5500.00 52.650 100.000 4755.01 4803.41
5574.16 52,650 100.000 4800.00 4848,40
5738.99 52.650 100.000 4900.00 4948.40
5824.04 52.650 100.000 4951.60 5000.00
5900.00 54,169 100.000 4996.88 5045.28
18 September, 1998 - 14:36
Sperry-Sun Drilling Services
Proposal Report for P2-11 (0) Wp I
Local Coordinates
Northings Eastings
(ft) (ft)
122.40 S 47.39W
128.51S 39.55W
137.01S 27.27W
146.84S 11.80W
157.97 S 6.82 E
160.83 S 11.76 E
170.27 S 28.88 E
183.42 S 55.04 E
197.38 S 85.28 E
212.11 S 119.53 E
227.60 S 157.74 E
243.81 S 199.83 E
257.13 S 235.81 E
260.70 S 245.77 E
277.54 S 297.05 E
293.96 S 354.19 E
309.87 S 416.90 E
325.19 S 484.89 E
339.86 S 557.81 E
347.70 S 600.35 E
349.33 S 609.57 E
381.44S 791.67 E
450.46 S 1183.10 E
456.78 S 1218.89 E
504.69 S 1490.65 E
519.48 S 1574.54 E
529.72 S 1632.59 E
552.47 S 1761.63 E
564.22 S 1828.22 E
574.81 S 1888.28 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (ft) (*/100ft) (ft)
5998456,11 N 681306.15 E 1.500 -35,01
5998450.20 N 681314.14 E 2.000 -26,61
5998442.00 N 681326.63 E 2,000 -13.54
5998432.55 N 681342.33 E 2,000 2.82
5998421.87 N 681361.22 E 2.000 22.46
5998419.13 N 681366.22 E 2.000 27.66
5998410.11 N 681383.57 E 2.500 45.64
5998397.60 N 681410.04 E 2.500 72.97
5998384.38 N 681440.60 E 2.500 104.44
5998370.48 N 681475.20 E 2.500 139.98
5998355.92 N 681513.78 E 2,500 179.54
5998340,74 N 681556.25 E 2.500 223.03
5998328.30 N 681592.54 E 2.500 260.16
5998324.98 N 681602.59 E 4.000 270.42
5998309.38 N 681654.26 E 4.000 323.12
5998294.36 N 681711.78 E 4.000 381.61
5998279.97 N 681774.86 E 4.000 445.59
5998266.30 N 681843.20 E 4.000 514.76
5998253.41 N 681916,46 E 4.000 588.78
5998246.60 N 681959.17 E 4.000 631.88
599824,5.19 N 681968.43 E 4.000 641.22
5998217.51N 682151.25 E 0.000 825.61
5998158.01N 682544.25 E 0.000 1221.96
5998152.57 N 682580.18 E 0.000 1258.20
5998111.26 N 682853.02 E 0.000 1533.37
5998098.51 N 682937.24 E 0.000 1618.31
5998089.69 N 682995.53 E 0,000 1677.09
5998070.07 N 683125.08 E 0.000 1807.75
5998059.95 N 683191.93 E 0.000 1875.18
5998050,82 N 683252.23 E 2.000 1935.99
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comment
Dir Rate Increase @ 2.000°/100ff' 2616.15ft MD, 2609.26ft TVD
Dir Rate Increase @ 2.500°/100ft' 3023.98ff MD, 3010.59ft TVD
Rate Increase @ 4.000°/100ft · 3679.09ft MD, 3616.21ft TVD
SV4 [Estimate]
Top Stuck Pipe Zone
End Dir' 4267.39ft MD, 4055.61ft 'I'VD
Sail @ 52.650° Inclination on 100.000° Azimuth
T-3 (TT6 / SV1)
Bottom Stuck Pipe Zone
9 5/8" Casing
Start Dir @ 2.000°/100ft ' 5824.04ft MD, 5000.00ft 'FVD
Continued...
DrillQuest
"-z-J
:::]:>
X
O
.
Shared Services Drilling
Point Mclntrye
Measured
Depth
(ft)
Incl. Azim.
6000.00 56.169
6100.00 58.169
6122.51 58.619
6200.00 60.169
6300.00 62.169
6400.00 64.169
6500.00 66.169
6589.04 - 67.950
6600.00 67.937
6700.00 67.817
6800.00 67.698
6900.00 67.579
7000.00 67.460
7100.00 67.341
7200.00 67.222
7300.00 67.104
~ 7400.00 66.986
.,'
7500.00 66.867
7600.00 66.749
7700.00 66.631
7800.00 66.514
7900,00 66.396
8000.00 66.279
8100.00 66.162
8200.00 66.045
8300.00 65.928
8400.00 65.811
8500.00 65.695
8600.00 65.578
8700.00 65.462
100.000
100.000
IO0.OO0
100.000
100.000
100.000
100.000
100.000
99.983
99.823
99.663
99.503
99.343
99.182
99.022
98.860
98.699
98.537
98.375
98.213
98.051
97.888
97.725
97.561
97.397
97.233
97.069
96.904
96.740
96.574
18 $~ptember, 1998 - 14:36
Sub-Sea
Depth
(ft)
5053.99
5108.20
5120.00
5159.45
5207.67
5252.80
5294.80
5329.50
5333.62
5371.28
5409.13
5447.17
5485.41
5523.84
5562.46
5601.27
5640.27
5679.46
5718.84
5758.41
5798.17
5838.12
5878.25
5918.58
5959.08
5999.78
6040.66
6081.73
6122.98
6164.42
Sperry-Sun Drilling Services
Vertical Local Coordinates
Depth Northings Eastings
(~) (fi) (~)
5102.39
5156.60
5!..68.40
5207,85
5256,07
5301.20
5343.20
5377,90
5382.02
5419,68
5457.53
5495,57
5533,81
5572.24
5610.86
5649.67
5688.67
5727.86
5767.24
5806.81
5846.57
5886.52
5926.65
5966.98
6007.48
6048.18
6089.06
6130.13
6171.38
6212.82
Proposal Report for P2-11 (0) Wp1
589.06 S 1969,11E
603.65 S 2051.86 E
606.98 S 2070.74 E
618.56 S 2136.42 E
633.77S 2222.69 E
649.27 S 2310.56 E
665.02 S 2399.93 E
679~6 S 2480.68 E
681.02 S 2490.69 E
696.96 S 2581.94 E
712.62 S 2673.17 E
728.02 S 2764.36 E
743.15 S 2855.51 E
758.01 S 2946.63 E
772.60 S 3037.71 E
786.92 S 3128.75 E
800.98 S 3219.75 E
814.76 S 3310.71 E
828.28 S 3401.63 E
841.53 S 3492.51 E
854.51 S 3583.34 E
867.22 S 3674.13 E
879.66 S 3764.88 E
891.83 S 3855.57 E
903.73 S 3946.22 E
915.36 S 4036.83 E
926.72 S 4127.38 E
937.81 S 4217.88 E
948.63 S 4308.33 E
959.18 S 4398.73 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (ft) (°/100ft) (ft)
5998038.53 N
5998025.96 N
5998023,09 N
5998013.10 N
5997999,99 N
5997986.63 N
5997973.05 N
5997960.77 N
5997959.25 N
5997945.54 N
5997932.10 N
5997918.92 N
5997906.00 N
5997893.36 N
5997880.98 N
5997868.87 N
5997857.03 N
5997845.46 N
5997834.15 N
5997823.11N
5997812.34 N
59978O1.84 N
5997791.60 N
5997781.64 N
5997771.94 N
5997762.51N
5997753.35 N
5997744.46 N
5997735.84 N
5997727.48 N
683333.39 E 2.000 2017,84
683416_46 E 2.000 2101.62
683435.42 E 2,000 2120.74
683501.36 E 2.000 2187.25
683587.97 E 2.000 2274.60
683676.20 E 2.000 2363.58
683765.93 E 2.000 2454.07
683847.00 E 2.000 2535.84
683857.04 E 0.190 2545.96
683948.66 E 0.190 2638.35
684040.24 E 0.190 2730.68
684131.77E 0.190 2822.95
684223.27 E 0.190 2915.15
684314.72 E 0.190 3007.29
684406.12 E 0.190 3099.37
684497.49 E 0.190 3191.39
684588.80 E 0.190 3283.33
684680.07 E 0.190 3375.21
684771.29 E 0.190 3467.03
684862.47E 0,190 3558,77
684953.59 E 0.190 3650.44
685044.66 E 0.190 3742.05
685135.68 E 0.190 3833.58
685226.64 E 0.190 3925.03
685317.56 E 0.190 4016.42
685408.41 E 0.190 4107.72
685499.21 E 0.190 4198.96
685589.96 E 0.190 4290.11
685680.64 E 0.190 4381.19
685771.27 E 0.190 4472.19
-3-
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comment
UG4A (K-15)
BHA Tendency @ 0.190°/100ft' 6589.04ft MD, 5377.90ff TVD
Continued...
Dri#Ouest
Z
Shared Services Drilling
Point Mclntrye
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
8800.00 65.346 96.409 6206.04. 6254.44.
8900.00 65.230 96.243 6247.85 6296.25
9000.00 65.115 96.077 6289.83 6338.23
9100.O0 64.999 95,910 6332.01 6380.41
9200.00 64.884 95,744 6374.36 6422.76
9300.00 64.769 95.576 6416.90 6465.30
9400,00 64.654 95,409 6459.61 6508.01
9500.00 64.540 95.241 6502.51 6550.91
9600.00 64.425 95.073 6545.59 6593.99
9700.00 64.311 94.905 6588.85 6637.25
9800.00 64.197 94.736 6632.29 6680.69
9900.00 64,083 94,567 6675,90 6724.30
10000.00 63.969 94,398 6719.70 6768.10
10100.00 63,856 94.228 6763.68 6812.08
10200.00 63.743 94.058 6807.83 6856.23
10300.00 63.629 93,888 6852.16 6900.56
it10400,00 63.517 93,717 6896.66 6945.06
'¢'10497.00 63.407 93.551 6940.00 6988.40.
10500.00 63.404 93.546 6941.34 6989.74
10600,00 63.291 93.375 6986.20 7034.60
10700.00 63.179 93,203 7031.23 7079.63
10800.00 63.067 93.031 7076.44 7124,84
10858.13 63.002 92.931 7102.80 7151.20
10900.00 62.955 92.859 7121.82 7170.22
11000.00 62.844 92. 686 7167,38 7215.78
11100.00 62.732 92,513 7213.11 7261.51
11200.00 62.621 92,340 7259.01 7307.41
11300.00 62.510 92.166 7305.08 7353.48
11400.00 62.399 91.992 7351.33 7399.73
11500.00 62.288 91,817 7397.75 7446.15
18 S~ptenz~ber, 1998 - 14:37
Sperry-Sun Drilling Services
Proposal Report for P2-11 (0) Wp I
Local Coordinates
Northings Eastings
(ft)
969.46 S 4489,07 E
979.47 S 4579.36 E
989.21 S 4669,59 E
998.68 S 4759,77 E
1007.88 S 4849.89 E
1016.80 S 4939.95 E
1025.46 S 5029.95 E
1033.84 S 5119.89 E
1041.95 S 5209.77 E
1049.79 S 5299.59 E
1057.36 S 5389.34 E
1064.66 S 5479.03 E
1071.69 S 5568.66 E
1078.44 S 5658.22 E
1084,92 S 5747,71 E
1091.13 S 5837,13 E
1097.07 S 5926.48 E
1102.57 S 601'3.09 E
1102.74 S 6015.76 E
1108.14 S 6104.98 E
1113.26 S 6194,12 E
1118.11 S 6283.18 E
1120.80 S 6334.92 E
1122.69 S 6372.17 E
1126.99 S 6461.09 E
1131.03 S 6549,93 E
1134.79 S 6638.69 E
1138.28 S 6727,38 E
1141.49 S 6815.98 E
1144.44 S 6904.51 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(fi) (fi) (°/100fi) (fi)
5997719.40 N 685861.63 E 0.190 4563,10
5997711.58 N 685952,34 E 0,190 4653,94
5997704,04 N 686042.78 E 0,190 4744.69
5997696,76 N 686133,16 E 0,190 4835.37
5997689,75 N 686223.48 E 0.190 4925.95
5997683.02 N ' 686313.73 E 0.190 5016.46
5997676.55 N 686403.92 E 0.190 5106.87
5997670.35 N 686494.04 E 0,190 5197.20
5997664.42 N 686584.09 E 0.190 5287.44
5997658.76 N 686674.07 E 0.190 5377.60
5997653.37 N 686763.98 E 0.190 5467.66
5997648.26 N 686853.82 E 0.190 5557.63
5997643.41 N 686943.59 E 0.190 5647.51
5997638.83 N 687033.28 E 0.190 5737.29
5997634.52 N 687122.90 E 0.190 5826.99
5997630.48 N 687212.45 E 0.190 5916.58
5997626.71 N 687301.92 E 0.190 6006.09
5997623.31 N 687388.63 E 0.190 6092.81
5997623.21 N 687391.32 E 0.190 6095.49
5997619.98 N 687480.63 E 0.190 6184.80
5997617.03 N 687569.87 E 0.190 6274.00
5997614.34 N 687659.03 E 0.190 6363.11
5997612.90 N 687710.81 E 0.190 6414,86
5997611.92 N 687748.10 E 0.190 6452.12
5997609.77 N 687837.10 E 0.190 6541.02
5997607.90 N 687926.01 E 0.190 6629.83
5997606.29 N 688014.84 E 0.190 6718.52
5997604.96 N 688103.58 E 0.190 6807.12
5997603.89 N 688192.24 E 0,190 6895.61
5997603.10 N 688280.81 E 0,190 6983.99
Comment
West Sak
Top Colville [Estimate]
-4-
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Continued...
DrillOuest
Shared Services Drilling
Point Mclntrye
Measu red
Depth
(ft)
Incl. Azim.
11600.00 62.178
11700.00 62.068
11800.00 61.958
11900.00 61.848
12000.00 61.739
12100.00 61.630
12200.00 61.521
12300.00 61.412
12400.00 61.303
12500.00 61.195
12600.00 61.087
12700.00 60.979
12800.00 60.872
12900.00 60.764
13000.00 60.657
13100.00 60.550
?'.3200.00 60.443
00.oo
13600.00 60.019
13700.00 59.914
13737.54 59.874
13800.00 59.809
13900.00 59.704
13919.53 59.683
14000.00 62.097
14100.00 65.096
14154.88 66.742
14160.96 66.742
Sub-Sea
Depth
(ft)
Sperry-Sun Drilling Services
Vertical Local Coordinates
Depth Northings Eastings
(ft) (ft) (it)
Proposal Report for P2-11 (0) Wp I
91.643 7444_33 7492.73 1147.11 S 6992.95 E
91,468 7491.09 7539.49 1149.51 S 7081,32 E
91.292 7538.02 7586.42 1151.63 S 7169.60 E
91.116 7585,11 7633.51 1153.49 S 7257.79 E
90.940 7632.38 7680.78 1155.07 S 7345.90 E
90.763 7679,81 7728.21 1156.38 S 7433.93 E
90.586 7727,41 7775.81 1157.41 S 7521,87 E
90.409 7775.18 7823.58 1158,18 S 7609,72 E
90.231 7823.11 7871.51 1158.67 S 7697.48 E
90.053 7871.21 7919.61 1158.89 S 7785.15 E
89.875 7919.48 7967.~8 1158.83 S 7872.73 E
89.696 7967.91 8016.31 1158.50 S 7960.22 E
89.517 8016.50 8064.90 1157.90 S 8047.62 E
89.337 8065.26 8113.66 1157.03 S 8134.92 E
89.157 8114.19 8162.59 1155.88 S 8222.13 E
88.977 8163.27 8211.67 ~ ,,',.. 1154.47 S 8309.24 E
88.797 8212.52 8260.9--~- 0"''~ 1152.78 S 8396.26 E
88.615 8261.93 8310.33 1150.81 S 8483.18 E
88.434 8311,50 8359.90 1148.58 S 8570.00 E
88.252 8361.23 8409.63 1146.07 S 8656.72 E
88.070 8411.12 8459.52 1143.29 S 8743.34 E
87.887 8461.17 8509.57 1140.23 S 8829.86 E
87.819 8480.00 8528.40.---- 1139.02 S 8862.31 E
87.704 8511.38 8559.78 1136.91 S 8916.28 E
87.521 8561.75 8610.15 1133.31 S 9002.59 E
87.485 8571.60 8620.00 1132.58 S 9019,43 E
87.419 8610.75 8659.15 1129.45 S 9089.67 E
87.341 8655.21 8703.61 1125.36 S 9179.13 E
87.300 8677.60 8726.00 1123.01 S 9229.18 E
87.300 8680.00 8728.40 1122.75 S 9234.75 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (ft) (°/lOOff) (ft)
5997602.57 N 688369.29 E 0.190 7072.26
5997602.32 N 688457.69 E 0.190 7160.43
5997602.34 N 688545.99 E 0.190 7248.48
5997602.62 N 688634.21 E 0.190 7336,43
5997603.18 N 688722.33 E 0.190 7424.26
5997604.01 N 688810.36 E 0.190 7511.98
5997605.11 N 688898.30 E 0.190 7599.59
5997606.48 N 688986.14 E 0.190 7687.08
5997608.12 N 689073.89 E 0.190 7774.46
5997610.03 N 689161.54 E 0.190 7861.72
5997612.21 N 689249.10 E 0.190 7948.86
5997614.66 N 689336.55 E 0.190 8035.88
5997617.38 N 689423.91 E 0.190 8122.79
5997620.37 N 689511.16 E 0.190 8209.58
5997623.63 N 689598.32 E 0.190 8296.24
5997627.16 N 689685.37 E 0.190 8382.78
5997630.96 N 689772.32 E 0.190 8469.20
5997635.04 N 689859.17 E 0.190 8555.50
5997639.38 N 689945.91 E 0.190 8641.67
5997643.99 N 690032.54 E 0.190 8727.71
5997648.87 N 690119.07 E 0.190 8813.63
5997654.03 N 690205.49 E 0.190 8899.42
5997656.03 N 690237.91 E 0.190 8931.59
5997659.45 N 690291.80 E 0.190 8985.08
5997665.14 N 690378.00 E 0.190 9070.61
5997666.28 N 690394.82 E 0.190 9087.30
5997671.11 N 690464.96 E 3.000 9156.88
5997677.38 N 690554.30 E 3.000 9245.49
5997680.93 N 690604.27 E 3.000 9295.06
5997681.33 N 690609.84 E 0.000 9300.58
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comment
CM3 (K-10)
Start Dir @ 3.000°/100ft ' 13919.53ft MD, 8620.00ft TVD
End Dir- 14154.88ft MD, 8726.00ft TVD
THRZ
x
18 S~'ptemC~er, 1998 - 14:37
-5-
Continued...
DrillQuest
Sperry-Sun Drilling Services
Proposal Report for P2-11 (0) Wp I
Shared Services Drilling
Point Mclntrye
Measured
Depth Incl. Az[m.
14387.8 6 66.742 87.300
14500.00 66.742 87.300
146t 6.80 66.742 87.300
14620.85 66.742 87.300
14700.00 69. I74 85.733
14770.16 71.341 84.386
Sub-Sea Vertical Local Coordinates
Depth Depth Northings Eastings
(ft) (ft) (ft) (ft)
8769.60 8818.00
8813.88 8862.28
8860.00 8908.40
8861.60 8910.00
8891.30 8939.70
1112.93 S 9442.99 E
1108.08 S 9545.90 E
1103.02 S 9653.09 E
1102.85 S 9656.81 E
1098.38 S 9730.03 E
8915.00 8963.40 1092.69
14935.19 71.341 84.386 8967.80 9016.20 1077.39
15000.00 71.341 84.386 8988.53 9036.93 1071.38
15067.09 71.341 84.386 9010.00 9058.40 1065.17
15100.23 71.341 84.386 9020.60 9069.00 1062.09
15251.51 71.341 84.386 9069.00 9117.40 1048.07
15391.51 - 71.341 84.386 9113.79 9162.19 1035.10
9795.81 E
7'~9, 5'7,
9951.42 E
10012.53 E
10075,79 E
10107.03 E
S 10249.67 E 5997780.62 N
S 10381.68 E 5997796.79 N
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vr ?al depths are relative to Well. Northings and Eastings are relative to Well.
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from We[I and calculated along an Azimuth of 95.694° (True).
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (ft) (°/100ft) (fi)
5997696.20 N 690817.78 E 0.000
5997703.55 N 690920.54 E 0.000
5997711.21 N 691027.58 E 0.000
5997711,47 N 691031.29 E 0.000
5997717.71 N 691104.38 E 3.579
5997725.00 N 691170.00 E 3.579
5997744.07 N 691325.19 E 0.000
5997751.56 N 691386.14 E 0,000
5997759.31 N 691449.23 E 0.000
5997763.14 N 691480.39 E 0.000
691622.65 E 0.000
691754.30 E 0.000
Based upon Minimum Curvature type calculations, at a Measured Depth of 15391.51ft.,
The Bottom Hole Displacement is 10433.15ft., in the Direction of 95.694° (True).
/
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comment
9506.82 Sail @ 66.742°Inclination on 87.300°Azimuth
9608.74
9714,90-. Kalubik
9718.58 S~d Dir @ 3.579¥100ff:14620.85ffMD, 8910.00fl TVD
9790.99
9855.89
10009.21
10069.42
10131,75
10162.54
10303.08
10433.15
End Dir: 14770.16ft MD, 8963.40fi TVD ~
TKaupar.u k.... _
rge~: ~z-u, 200.00 Radius., Geological
Sail @ 71.341 o Inclination on 84.386° Azimuth
Miluveach
?-
WOC
TarGet: 15391.51ff MD, 9162.19ff 'i'VD
7" Casing
7]:>
X
18 S&=ptem~-er, 1998 - 14:37
Cont/nued...
DrillQuest
140319
VENDOR A~ -ASKAST 14 OD
DATE INVOICE / CREDrr MEMO DESCRIPTION GROSS DISCOUNT ET
)70998 CKO70998H lO0. O0 100. O0
HANDL~INQ INST' s/h ca~'ol ~uitheyx 4114
FIELD & POOL
INIT CLASS
WELL. NAME ~.,'~/~'e_ /~-///, PROGRAM: exp [] dev'~.redr,l [] serv r'l wellbore segll ann. disposal para reqll
!ADMINISTRATION
_R DATE
1. Permit fee attached .......................
2. Lease number appropriate ...................
3. Unique well name and number ..................
4. Well located in a defined pool ..................
5. Well Iocaled proper dislance from drilling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficient acreage available in drilling uni! ............
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
ENGINEERING
APPR. DATE
GEOL AREA ~'~'C3 UNIT# /~'~ ON/OFF SHORE
N ._.
_
~N
GEOLOGY
14. Conductor string provided ................... ~ N __
15. Surface casing protects all known USDWs ........... ~,J N
16. CMT vol adequale to circulate on conductor & surf csg ..... N
17. CMr vol adequate to tie-in long string to surf csg ........ Y N
'18. CM'[' will cover all known productive horizons .......... [~ N
19. Casing designs adequate for C, T, B & permafrost ....... ~ N
20. Adequate tankage or reserve pit ................. ~ N
21. If a re-drill, has a ~0-403 for abandonment been approved...
22. Adequate wellbore separation proposed .............
23. If diveder required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequate .....
25. BOPEs, do they meet regulation ................
26. BOPE press rating appropriate; test to -5'00 ..~ psig.
27. Choke manifold complies w/APl RP-53 (May 84) ........
28. Work will occur without operation shutdown ...........
29. Is presence of H~S gas probable ................. Y (~
30. Permit can be issued wlo hydrogen sulfide measures ..... ~YY N/~); -~.-~
31. Data presenled on potential overpressure zones .......
32. Seismic analysis of shallow gas zones ..... ' ........
33. Seabed condition survey (if off-shore) .............
34. Contact nam. e/phone.for weekly progress reports ....... / Y N
[exploratory only]
ANNULAR DISPOSAL 35.
With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone; .......
(B) will not contaminate freshwater; or cause drilling waste...
to surface;
(C) wiii'~bt'impair.,_mechanical integrity of the well used for disposal;
(D) will not damage producing formation or impair recovery from a
pool; and
(E) will not circurnve, n,t 20 AA(; 25.252 or 20 AAC 25.412.
~ I:',~__~..-:; jBgHW~<)/~J' /A~ coMMISsIoN:
CO
Y N
Y N
Y N
Y N ............................................................................................................................................
Y N
APPR DATE
Commentsllnstructions:
Mcheklisl lev 05129198
rill C ~rlm()lfl( ~!~w~,(ti.ql~dtal)a¥ h.. l. h.t
Well HistorY File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
* ALASKA COMPUTING CENTER *
, ,
....... SCHLUAIBERGER .......
COMPANY NAM~ : ARCO ALASKA, INC.
WELL NAME : P2-11
FIELD NAFiE : POINT MCINTYRE
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUIViBER : 500292292300
REFERENCE NO : 98604
LIS Ta~T;erification Listing
Schlumberger Alaska Computing Center
23 -NOV- 19~'~J9:13
PAGE:
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 98/11/23
ORIGIN : FLIC
REEL NAME : 98604
CONTINUATION # :
PREVIOUS REEL :
COGENT : ARCO ALASKA, POINT MCINTYRE, P2-11, API #50-029-22923-00
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 98/11/23
ORIGIN : FLIC
TAPE NAME : 98604
CONTINUATION # : 1
PREVIOUS TAPE :
COMMENT : ARCO ALASKA, POINT MCINTYRE, P2-11, API #50-029-22923-00
TAPE HEADER
POINT MCINTYRE
CASED HOLE WIRELINE LOGS
WELL NAME: P2-11
API NUMBER: 500292292300
OPERATOR: ARCO ALASKA, INC.
LOGGING COMPANY: SCHLUMBERGER WELL SERVICES
TAPE CREATION DATE: 20-NOV-98
JOB NUMBER: 98604
LOGGING ENGINEER: D KIRKBY
OPERATOR WITNESS: C DIXON
SURFACE LOCATION
SECTION: 11
TOWNSHIP: 12N
RANGE: 14E
FNL:
FSL: 11
FEL:
FWL: 1115
ELEVATION(FT FROM MSL O)
KELLY BUSHING: 49.80
DERRICK FLOOR: 49.80
GROUND LEVEL: 11.40
WELL CASING RECORD
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING 6. 000 4. 500 15157.0
2ND STRING
3RD STRING
PRODUCTION STRING
CURVE SHIFT DATA - ALL PASSES TO STANDARD (f4~ASURED DEPTH)
LIS TaP~Jerification Listing
Schlumberger Alaska Computing Center
23-NOV-199~-~09:13
BASELINE CURVE FOR SHIFTS
LDWG TOOL CODE:
LDWG CURVE CODE:
RUN NUM~ER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
BASELINE DEPTH
..............
$
REd. ARKS:
.......... EQUIVALENT UNSHIFTED DEPTH ..........
THIS FILE CONTAINS THE LDWG FORMATTED CASED HOLE
USIT-GR DATA AQUIRED ON ARCO ALASKA'S P2-11 WELL.
LOG IS THE PRIMARY DEPTH CONTROL.
$
THIS
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/23
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 1
DEPTH INCREMENT: O. 5000
FILE SUM~iARY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 14898.0 14000.0
CET 14898.0 14000.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE:
PASS NUFiBER:
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
BASELINE DEPTH GRCH CET
$
RESfARKS: THIS FILE CONTAINS THE EDITED CASED HOLE DATA. THE
CURVES ARE CLIPPED OF INVALID COUNTS AT FIRSTLING
LIS Tap~--~'erification Listing
Schlumberger Alaska Computing Center
23 -NOV-19~o~09 :13
PA GE:
AND AT LAST READING. THE CURVES HAVE BEEN MERGED AT
14400'. THERE IS A ROUGHLY 30' SECTION OF NULL VALUES
AT THE SPLICE POINT WHERE THE TWO PASSES DID NOT
OVERLAP.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 20
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 51
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 6037499 O0 000 O0 0 1 1 1 4 68 0000000000
GRCH CET GAPI 6037499 O0 000 O0 0 1 1 1 4 68 0000000000
CCL CET 6037499 O0 000 O0 0 1 1 1 4 68 0000000000
TENS CET LB 6037499 O0 000 O0 0 1 1 1 4 68 0000000000
TEND CET LB 6037499 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT.
TEND.CET
14000.000
377.208
GRCH. CET 81 . 513 CCL . CET 4. 718 TENS . CBT
1404.000
LIS Tap~?~erification Listing
Schlumberger Alaska Computing Center
23 -NOV- 19~/09:13
PAGE:
DEPT. 14958. 000 GRCH. CET
TEND. CET 1359.116
-999.250 CCL. CET -999.250 TENS. CET 1857.000
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .00I
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/23
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE · FLIC
VERSION · O01CO1
DATE . 98/11/23
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 2
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 1
DEPTH INCREFIENT: 0.5000
FILE SUM~zARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
14958.5 14396.0
USIT
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
23-0CT-98
8Cl-205
15157.0
14000.0
14898.0
LIS Tape-.Verification Listing
Schlumberger Alaska Computing Center
23 -NOV- 19~09:13
PAGE:
VENDOR TOOL CODE TOOL TYPE
GR GAM~A RAY
USIT ULTRA SONIC IMAGER
$
TOOL NUFiBER
SGC- SA
USIT-A
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT) :
6.000
15157.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
BRINE
10.30
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS):
FAR COUNT RATE HIGH SCALE (CPS):
NEAR COUNT RATE LOW SCALE (CPS):
NEAR COUNT RATE HIGH SCALE (CPS):
TOOL STANDOFF (IN):
REMARKS: Primary depth control used. No depth corrections
were applied to the log.
Class"G" cement used (15.7 ppg). Cement job was completed
at 20:00 on 21-0ct-98.
Tools ran on drill pipe with TLC gear and 5 flex joints.
7" casing depth is 14642'. 4.5" liner starts at 14411'.
Hole size is 8.75" to 15066' and 6" to 15157'
USIT ran in measurement while going down.
Assumed DFVL = 170 us/ft and Zmud = 1.9 Mray
RIG: Nabors 33E
THIS FILE CONTAINS THE RAW DATA FOR PASS #1.
$
LIS FORMAT DATA
LIS Tap~Cerification Listing
Schlumberger Alaska Computing Center
23 -NOV- 19~'09:13
PAGE: 6
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 28
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 36
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELaM CODE (HEX)
DEPT FT 6037499 O0 000 O0 0 2 1 1 4 68 0000000000
TENS PS1 LB 6037499 O0 000 O0 0 2 1 1 4 68 0000000000
HTEN PS1 LB 6037499 O0 000 O0 0 2 1 1 4 68 0000000000
MRES PS1 0H~I6037499 O0 000 O0 0 2 t 1 4 68 0000000000
CCLU PS1 6037499 O0 000 O0 0 2 1 1 4 68 0000000000
MTE~PS1 DEGF 6037499 O0 000 O0 0 2 1 1 4 68 0000000000
GR PS1 GAPI 6037499 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT.
CCLU. PS1
14958.500 TENS.PSI 1637.000 HTEN. PS1 1206.065 FiRES.PSi
0.000 MTEM. PSl 172.717 GR.PS1 22.500
DEPT. 14396.000 TENS.PSI 2074.000 HTEN. PS1 409.824 MRES.PS1
CCLU. PS1 -0.080 MTE~I. PS1 162.656 GR.PS1 79.611
O. 018
O. 020
** END OF DATA **
LIS Tap=~t~erification Listing
Schlumberger Alaska Computing Center
23 -NOV-19~-'09 :13
PAGE:
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/23
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/23
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 3
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 2
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
USIT 14429.5
$
LOG HEADER DATA
STOP DEPTH
13997.0
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAMMA RAY
USIT ULTRA SONIC IMAGER
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
23-0CT-98
8Cl-205
15157.0
14000.0
14898.0
TOOL NUMBER
SGC-SA
USIT-A
6. 000
LIS Tap~-Verification Listing
Schlumberger Alaska Computing Center
PAGE:
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT) :
15157.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
BRINE
10.30
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS):
FAR COUNT RATE HIGH SCALE (CPS):
NEAR COUNT RATE LOW SCALE (CPS):
NEAR COUNT RATE HIGH SCALE (CPS):
TOOL STANDOFF (IN):
REMARKS: Primary depth control used. No depth corrections
were applied to the log.
Class"G" cement used (15.7 ppg). Cement job was completed
at 20:00 on 21-0ct-98.
Tools ran on drill pipe with TLC gear and 5 flex joints.
7" casing depth is 14642'. 4.5" liner starts at 14411'.
Hole size is 8.75" to 15066' and 6" to 15157'
USIT ran in measurement while going down.
Assumed DFVL = 170 us/ft and Zmud = 1.9 Mray
RIG: Nabors 33E
THIS FILE CONTAINS THE RAW DATA FOR PASS #2.
$
LIS FORMAT DATA
LIS Ta'pJ~ Verification Listing
Schlumberger Alaska Computing Center
23-NOV-1998 09:13
PAGE: 9
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 28
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 36
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUFiB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT 6037499 O0 000 O0 0 3 1 1 4 68 0000000000
TENS PS2 LB 6037499 O0 000 O0 0 3 1 1 4 68 0000000000
HTEN PS2 LB 6037499 O0 000 O0 0 3 1 1 4 68 0000000000
MRES PS2 OHFiM6037499 O0 000 O0 0 3 1 1 4 68 0000000000
CCLU PS2 6037499 O0 000 O0 0 3 1 1 4 68 0000000000
MTE~PS2 DEGF 6037499 O0 000 O0 0 3 1 1 4 68 0000000000
GR PS2 GAPI 6037499 O0 000 O0 0 3 1 i 4 68 0000000000
** DATA **
DEPT. 14429.500 TENS.PS2 1467.000 HTEN. PS2
CCLU. PS2 0.000 MTEM. PS2 164.968 GR. PS2
DEPT. 13997.000 TENS.PS2 1408.000 HTEN. PS2
CCLU. PS2 0.410 MTEM. PS2 156.663 GR. PS2
217.753 MRES. PS2
146.250
377.208 FiRES.PS2
79.362
O. 020
O. 020
** END OF DATA **
LIS Tape'~eftification Listing
Schlumberger Alaska Computing Center
23-NOV-1998"~9:13
PAGE: 10
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : 001C01
DATE : 98/11/23
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NA~E : EDIT
DATE : 98/11/23
ORIGIN : FLIC
TAPE NAME : 98604
CONTINUATION # : 1
PREVIOUS TAPE :
COMMENT : ARCO ALASKA, POINT MCINTYRE, P2-11, API #50-029-22923-00
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 98/11/23
ORIGIN : FLIC
REEL NAME : 98604
CONTINUATION # :
PREVIOUS REEL :
COGENT : ARCO ALASKA, POINT MCINTYRE, P2-i1, API #50-029-22923-00
Sperry-Sun Drilling Services
LIS Scan Utility
Thu Jan 28 15:57:31 1999
Reel Header
Service name ............. LISTPE
Date ..................... 99/01/28
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Tape Header
Service name ............. LISTPE
Date ..................... 99/01/28
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
POINT McINTYRE
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
MWD RUN 2
AK-MM-80391
M. HALL
K. WHITE
P2-11 PB1
500292292370
ARCO ALASKA, INC.
SPERRY-SUN DRILLING SERVICES
28-JAN-99
MWD RUN 3
AK-MM-80391
B. ZIEMKE
K. WHITE
11
12N
14E
1115
.00
49.80
11.40
RECEIVED
FEB 02 1999
Alaska Oil & Gas Cons. Commission
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
12.250 9.625 5740.0
8.750 15066.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. MWD RUN 1 IS DIRECTIONAL ONLY AND IS NOT PRESENTED.
3. MWD RUN 2 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR)
AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR-4).
4. MWD RUN 3 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR),
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR-4), COMPENSATED NEUTRON
POROSITY (CNP), AND
STABILIZED LITHO DENSITY (SLD).
5. THIS WELL REACHED A TOTAL DEPTH OF 15064'MD,
9066'SSTVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(SHALLOW SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY (SANDSTONE
MATRIX-FIXED
HOLE SIZE).
SNNA = SMOOTHED AVERAGE OF NEAR DETECTORS' COUNT RATES.
SNFA = SMOOTHED AVERAGE OF FAR DETECTORS' COUNT RATES.
SBD2 = SMOOTHED BULK DENSITY - COMPENSATED.
SC02 = SMOOTHED STAND OFF CORRECTION.
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR.
ENVIRONMENTAL PARAMETERS USED IN PROCESSING
NUCLEAR/NEUTRON LOG DATA:
HOLE SIZE =
MUD FILTRATE SALINITY =
MUD WEIGHT =
FORMATION WATER SALINITY =
FLUID DENSITY =
MATRIX DENSITY =
LITHOLOGY =
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
8.75"
20000 PPM
9.6 - 10.3 PPG
14545 PPM
1.0 G/cc
2.65 G/cc
SANDSTONE
Date of Generation ....... 99/01/28
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE
GR
ROP
FET
RPD
RPM
RPS
RPX
FCNT
NCNT
NPHI
PEF
DRHO
RHOB
$
BASELINE CURVE FOR SHIFTS:
.5000
START DEPTH
5614 0
5670 0
5741 0
5741 0
5741 0
5741 0
5741 0
13132 0
13132.0
13132.0
13166.0
13166.0
13166.0
CURVE SHIFT DATA (MEASD-RED DEPTH)
BASELINE DEPTH
5614.0
14014.5
14015.5
14020.5
14022.5
14029 0
14039 0
14051 5
14055 0
14060 5
14064 0
14067 5
14070 5
14073.0
14075.0
14079.0
14082.5
14096.5
14100.5
14104.0
14133.0
14149.0
14150.5
14173.0
STOP DEPTH
15003.0
15064.0
14983.0
14983.0
14983.0
14983.0
14983.0
14957.5
14957.5
14957.0
14992.0
14992.0
14992.0
......... EQUIVkLENT LTNSHIFTED DEPTH
GR
5613
14013
14015
14020
14023
14028
14038
14051
14054
14060
14063
14066
14070
14072
14075
14077
14081
14095
14099
14101
14131
14147.
14150.
14172.
0
5
5
5
0
0
5
5
0
5
5
5
0
5
0
5
5
5
5
5
0
5
0
5
14175
14186
14193
14196
14197
14201
14208
14213
14215
14220
14226
14228
14235
14241
14244
14247
14249
14252
14255
14260
14272
14277
14279
14283
14289
14293
14297
14325
14338
14342
14346
14350
14356
14404
14408
14421
14423
14425
14428
14431
14445
14449
14453
14458
14465
14470
14477
14480
14483
14495
14497
14500
14503
14507
14518
14535
14539
0
5
0
0
5
0
5
0
5
0
0
5
5
5
5
0
0
0
0
0
5
5
5
0
5
0
5
.0
.5
.5
.5
.0
.5
.5
.5
.0
.5
.5
.5
.0
5
5
0
0
5
5
5
0
.5
0
5
5
5
5
0
5
0
14175 0
14185 5
14190 0
14193 0
14196 0
14199 5
14205 5
14211 5
14214 0
14217 5
14223 5
14226 5
14234 5
14239 5
14242 0
14245 0
14247 0
14251 0
14254 5
14260 0
14271 5
14275 0
14276 5
14281 0
14289 5
14292 0
14297 0
14324 0
14337 0
14342 5
14345 5
14350 0
14356 5
14404 0
14406 5
14418 5
14422 0
14423 0
14427 5
14431 0
14446 5
14450 0
14452 0
14457 5
14463 0
14470 5
14477 5
14480 0
14482 5
14494 5
14497 5
14499 5
14503 5
14508 0
14519 0
14536 0
14541 0
14560
14562
14569
14578
14589
14592
14599
14603
14605
15064
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
$
REMARKS:
14560.5
14563.5
14571.0
14580.5
14588.0
14591.5
14597.5
14602.5
14605.0
15063.5
BIT RUN NO MERGE TOP MERGE BASE
2 5669.0 13233.0
3 13233.0 15064.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
ROP MWD FT/H 4 1 68
GR MWD API 4 1 68
RPX MWD OHMM 4 1 68
RPS MWD OHMM 4 1 68
RPM MWD OHMM 4 1 68
RPD MWD OHMM 4 1 68
FET MWD HOUR 4 1 68
NPHI MWD P.U. 4 1 68
NCNT MWD CNTS 4 1 68
FCNT MWD CNTS 4 1 68
RHOB MWD G/CC 4 1 68
DRHO MWD G/CC 4 1 68
PEF MWD BARN 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
32 9
36 10
40 11
44 12
48 13
52 14
Name Min Max
DEPT 5614 15064
ROP 0.35 2854.69
GR 7.54 466.83
RPX 0.61 1877.36
Mean Nsam
10339 18901
232.449 18789
94.6477 18779
3.77858 18485
First
Reading
5614
5670
5614
5741
Last
Reading
15064
15064
15003
14983
RPS 0.63 2000 4.25763 18485
RPM 0.61 1961.49 4.77094 18485
RPD 0.55 2000 5.21116 18485
FET 0.1067 25.6612 1.05296 18485
NPHI 18.62 59.12 35.1345 3651
NCNT 2184 3457 2692.75 3652
FCNT 476 1038 690.799 3652
RI{OB 1.63 3.09 2.43465 3653
DRHO -0.43 0.61 0.0269614 3653
PEF 1.95 12.48 4.47758 3653
5741
5741
5741
5741
13132
13132
13132
13166
13166
13166
14983
14983
14983
14983
14957
14957.5
14957.5
14992
14992
14992
First Readin9 For Entire File .......... 5614
Last Readin9 For Entire File ........... 15064
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/01/28
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/01/28
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
P~AW MWD
Curves and lo9 header data for each bit run in separate files.
BIT RUN NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
FET
RPD
RPM
RPS
RPX
$
2
.5000
START DEPTH
5613 0
5669 0
5740 0
5740 0
5740 0
5740 0
5740 0
STOP DEPTH
13176.5
13233.0
13169.5
13169.5
13169.5
13169.5
13169.5
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
06-0CT-98
5.07
5.46
MEMORY
13233.0
5669.0
13233.0
53.2
66.1
TOOL NUMBER
P1096CRGM6
P1096CRGM6
8.750
8.8
LSND
9.60
42.0
9.0
1600
4.2
2.000
1.012
1.500
3.000
62.8
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
GR MWD 2 API 4 1 68
RPX MWD 2 OHMM 4 1 68
RPS MWD 2 OHMM 4 1 68
RPM MWD 2 OHMM 4 1 68
RPD MWD 2 OHMM 4 1 68
ROP MWD 2 FT/H 4 1 68
FET MWD 2 HOUR 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
Name
DEPT
GR
RPX
RPS
RPM
RPD
ROP
FET
Min
5613
7 54
0 61
0 63
0 61
0 55
0 35
0.1067
Max
13233
162.09
1877.36
2000
1606.59
2000
2854.69
10.3756
Mean Nsam
9423 15241
83.1609 15128
3.3721 14860
3.65056 14860
3.66897 14860
4.44589 14860
257.108 15129
0.738472 14860
First
Reading
5613
5613
5740
5740
5740
5740
5669
5740
Last
Reading
13233
13176.5
13169.5
13169.5
13169.5
13169.5
13233
13169.5
First Reading For Entire File .......... 5613
Last Reading For Entire File ........... 13233
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/01/28
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/01/28
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
FCNT
NCNT
NPHI
FET
RPD
RPM
13131 0
13131 0
13131 0
13153 5
13153 5
13153 5
RPS 13153 5
RPX 13153 5
PEF 13165 0
DRHO 13165 0
RHOB 13165 0
GR 13174 5
ROP 13239 5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
CNP COMPENSATED NEUTRON
SLD STABILIZED LITHO DEN
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPER3kTURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
STOP DEPTH
14957.0
14957.0
14956.5
14982.5
14982.5
14982 5
14982 5
14982 5
14991 5
14991 5
14991 5
15002 5
15063 5
09-OCT-98
5.07
5.46
MEMORY
15064.0
13233.0
15064.0
62.6
64.6
TOOL NUMBER
P1098HRLGM6
P1098HRLGM6
P1098HRLGM6
P1098HRLGM6
8.750
8.8
GEM G P
10.30
49.0
8.8
20000
3.2
.410
.185
73.0
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN) :
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type.o.0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
GR MWD 3 API 4 1 68
RPX MWD 3 OHMM 4 1 68
RPS MWD 3 OHMM 4 1 68
RPM MWD 3 OHMM 4 1 68
RPD MWD 3 OHMM 4 1 68
NPHI MWD 3 P.U. 4 1 68
ROP MWD 3 FT/H 4 1 68
FET MWD 3 HOUR 4 1 68
R/ROB MWD 3 G/CC 4 1 68
DRHO MWD 3 G/CC 4 1 68
PEF MWD 3 BARN 4 1 68
FCNT MWD 3 CNTS 4 1 68
NCNT MWD 3 CNTS 4 1 68
.220
.560
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
32 9
36 10
40 11
44 12
48 13
52 14
Name Min
DEPT 13131
GR 31.53
RPX 1.22
RPS 1.15
RPM 0.92
RPD 0.95
NPHI 18.62
ROP 10.6
FET 0.3686
RHOB 1.63
DRHO -0.43
Max
15063.5
503 19
64 49
133 75
1961 49
1503 72
59 12
445 19
25.6;12
3.09
0.61
Mean
14097.2
141.987
5.42215
6.7243
9.24665
8.31436
35.1392
130.772
2.5394
2.43451
0.0269048
Nsam
3866
3657
3659
3659
3659
3659
3652
3649
3659
3654
3654
First
Reading
13131
13174.5
13153.5
13153.5
13153.5
13153.5
13131
13239.5
13153.5
13165
13165
Last
Reading
15063.5
15002.5
14982.5
14982.5
14982.5
14982.5
14956.5
15063.5
14982.5
14991.5
14991.5
PEF 1.95 12.48 4.47964 3654
FCNT 476 1038 690.49 3653
NCNT 2184 3457 2692.58 3653
13165 14991.5
13131 14957
13131 14957
First Reading For Entire File .......... 13131
Last Reading For Entire File ........... 15063.5
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/01/28
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 99/01/28
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writin9 Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 99/01/28
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writin9 Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File
Sperry-Sun Drilling Services
LIS Scan Utility
Tue Feb 02 13:30:29 1999
Reel Header
Service name ............. LISTPE
Date ..................... 99/02/02
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Tape Header
Service name ............. LISTPE
Date ..................... 99/02/02
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
POINT McINTYRE
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 2
AK-MM-80391
M. HALL
K. WHITE
P2-11
500292292300
ARCO ALASKA, INC.
SPERRY-SUN DRILLING SERVICES
02-FEB-99
MWD RUN 3 MWD RUN 4
AK-MM-80391 AK-MM-80391
B. ZIEMKE G.TOBIAS
K. WHITE C.DIXON
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
MWD RUN 5
AK-MM-80391
G.TOBIAS
C.DIXON
11
12N
14E
RECEIVED
FEB 02 1999
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1115
.00
49.80
11.40
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2N-D STRING 12.250 9.625 5740.0
3RD STRING 8.750 7.000 14642.0
PRODUCTION STRING 6.000 15203.0
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. MWD RUN 1 IS DIRECTIONAL ONLY 2~ND IS NOT PRESENTED.
3. MWD RUN 2 IS DIRECTIONAL WITH DUAL GAMMA ILAY (DGR)
AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR-4) .
4. MWD RUN 3 IS DIRECTIONAL WITH DUAL GAMMA P~AY (DGR),
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR-4), COMPENSATED NEUTRON
POROSITY (CNP), AAID
STABILIZED LITHO DENSITY (SLD) .
5. MWD RUNS 4 AND 5 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) AND
ELECTROMAGNETIC WAVE RESISTIVITY PtAASE-4 (EWR-4) .
6. THIS WELL REACHED A TOTAL DEPTH OF 15203'MD,
8941'SSTVD.
SROP = SMOOTHED ILATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(SHALLOW SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING).
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY (SANDSTONE
MATRIX-FIXED
HOLE SIZE).
SNNA = SMOOTHED AVER_AGE OF NEAR DETECTORS' COUNT RATES.
SNFA = SMOOTHED AVERAGE OF FAR DETECTORS' COUNT RATES.
SBD2 = SMOOTHED BULK DENSITY - COMPENSATED.
SC02 = SMOOTHED STAND OFF CORRECTION.
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR.
ENVIRONMENTAL PARAMETERS USED IN PROCESSING
NUCLEAR/NEUTRON LOG DATA:
HOLE SIZE = 8.75"
MUD FILTRATE SALINITY = 20000 PPM
MUD WEIGHT = 9.6 - 10.3 PPG
FORMATION WATER SALINITY =
FLUID DENSITY =
MATRIX DENSITY =
LITHOLOGY =
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/02/02
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
14545 PPM
1.0 s/cc
2.65 G/cc
SANDSTONE
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 5614.0
ROP 5670 0
FET 5741 0
RPD 5741 0
RPM 5741 0
RPS 5741 0
RPX 5741
FCNT 13132
NCNT 13132
NPHI 13132
PEF 13166
DRHO 13166
RHOB 13166
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
GR
5613 0
14013 5
14015 5
14020 5
14023 0
14028 0
14038 5
14051 5
14054 0
14060 5
14063 5
14066 5
14070 0
14072 5
14075 0
BASELINE DEPTH
5614.0
14014 5
14015
14020
14022
14029
14039
14051
14055
14060
14064
14067
14070
14073
14075
STOP DEPTH
15118.5
15202 5
15125 5
15125 5
15125 5
15125 5
15125 5
14631 0
14631 0
14631 0
14631 0
14631 0
14631 0
EQUIVALENT UNSHIFTED DEPTH --
14079
14082
14096
14100
14104
14133
14149
14150
14173
14175
14186
14193
14196
14197
14201
14208
14213
14215
14220
14226
14228
14235
14241
14244
14247
14249
14252
14255
14260
14272
14277
14279
14283
14289
14293
14297
14325
14338
14342
14346
14350
14356
14404
14408
14421
14423
14425
14428
14431
14445
14449
14453
14458
14465
14470
14477
14480
14077
14081
14095
14099
14101
14131
14147
14150
14172
14175
14185
14190
14193
14196
14199
14205
14211
14214
14217
14223
14226
14234
14239
14242
14245
14247
14251
14254
14260
14271
14275
14276
14281
14289
14292
14297
14324
14337
14342
14345
14350
14356
14404
14406
14418
14422
14423
14427
14431
14446
14450
14452
14457
14463
14470
14477
14480
14483 5
14495 0
14497 5
14500 5
14503 5
14507 5
14518 0
14535 5
14539 0
14560 0
14562 5
14569 0
14578 0
14589 0
14592 0
14599 0
14603 5
14605 5
14609 5
14619 0
14620 5
14630 5
14634 5
14637 5
14640 5
14643 0
14662 5
14664 0
14668 0
14672 5
14692 0
14700 5
14706 0
14708 5
14711 5
14717 0
15202 5
$
MERGED DATA
PBU TOOL
MWD
MWD
MWD
MWD
$
REMARKS:
SOURCE
CODE
14482.5
14494.5
14497 5
14499 5
14503 5
14508 0
14519 0
14536 0
14541 0
14560 5
14563 5
14571 0
14580 5
14588 0
14591 5
14597 5
14602 5
14605 0
14608 5
14623 0
14624 5
14641 5
14644 5
14648 0
14652 5
14654 0
14665 5
14669 5
14671 5
14675 5
14694 0
14700 5
14707 0
14710 5
14714 0
14718 0
15203 5
BIT RUN NO MERGE TOP MERGE BASE
2 5755.0 13233.0
3 13233.0 14642.0
4 14642.0 14700.0
5 14700.0 15203.0
MERGED MAIN
$
PASS.
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
ROP MWD FT/H 4 1 68
GR MWD API 4 1 68
RPX MWD OHMM 4 1 68
RPS MWD OHMM 4 1 68
RPM MWD OHMM 4 1 68
RPD MWD OHMM 4 1 68
FET MWD HOUR 4 1 68
NPHI MWD P.U. 4 1 68
NCNT MWD CNTS 4 1 68
FCNT MWD CNTS 4 1 68
RHOB MWD G/CC 4 1 68
DRHO MWD G/CC 4 1 68
PEF MWD BARN 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
32 9
36 10
40 11
44 12
48 13
52 14
Name Min Max Mean Nsam
DEPT 5614 15202.5 10408.2 19178
ROP 0.35 2854.69 225.091 19066
GR 7.54 466.83 93.2769 19010
RPX 0.3286 2000 4.63548 18770
RPS 0.3945 2000 5.32712 18770
RPM 0.5629 2000 6.96053 18770
RPD 0.55 2000 8.48844 18770
FET 0.1067 39.0736 1.46079 18770
NPHI 18.62 59.12 36.1895 2999
NCNT 2184 3457 2643.71 2999
FCNT 517 1038 692.695 2999
RHOB 1.63 3.07 2.44259 2931
DRHO -0.43 0.61 0.0263477 2931
PEF 2.44 12.48 4.66496 2931
First
Reading
5614
5670
5614
5741
5741
5741
5741
5741
13132
13132
13132
13166
13166
13166
Last
Reading
15202 5
15202 5
15118 5
15125 5
15125 5
15125 5
15125 5
15125 5
14631
14631
14631
14631
14631
14631
First Reading For Entire File .......... 5614
Last Reading For Entire File ........... 15202.5
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/02/02
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/02/02
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 5613 0 13176 5
ROP 5669 0 13233 0
FET 5740 0 13169 5
RPD 5740 0 13169 5
RPM 5740 0 13169 5
RPS 5740 0 13169 5
RPX 5740 0 13169 5
$
LOG HEADER DATA
DATE LOGGED: 06-0CT-98
SOFTWARE
SURFACE SOFTWARE VERSION: 5.07
DOWNHOLE SOFTWARE VERSION: 5.46
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT) : 13233.0
TOP LOG INTERVAL (FT) : 5755.0
BOTTOM LOG INTERVAL (FT) : 13233.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 53.2
MAXIMUM ANGLE: 66.1
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
TOOL NUMBER
P1096CRGM6
P1096CRGM6
8.750
8.8
LSND
9.60
42.0
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
9.0
1600
4.2
2.000
1.012
1.500
3.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 2 API 4 1 68 4 2
RPX MWD 2 OHMM 4 1 68 8 3
RPS MWD 2 OHMM 4 1 68 12 4
RPM MWD 2 OHMM 4 1 68 16 5
RPD MWD 2 OHMM 4 1 68 20 6
FET MWD 2 HOUR 4 1 68 24 7
ROP MWD 2 FT/H 4 1 68 28 8
62.8
First
Name Min Max Mean Nsam Reading
DEPT 5613 13233 9423 15241 5613
GR 7.54 162.09 83.1609 15128 5613
RPX 0.61 1877.36 3.3721 14860 5740
RPS 0.63 2000 3.65056 14860 5740
RPM 0.61 1606.59 3.66897 14860 5740
RPD 0.55 2000 4.44589 14860 5740
FET 0.1067 10.3756 0.738472 14860 5740
ROP 0.35 2854.69 257.108 15129 5669
Last
Reading
13233
13176 5
13169 5
13169 5
13169 5
13169 5
13169 5
13233
First Reading For Entire File .......... 5613
Last Reading For Entire File ........... 13233
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/02/02
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/02/02
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
VENDOR TOOL CODE
FCNT
NCNT
NPHI
FET
RPD
RPM
RPS
RPX
PEF
DRHO
RHOB
GR
ROP
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
3
.5000
ST~LRT DEPTH
13131 0
13131 0
13131 0
13153 5
13153 5
13153 5
13153 5
13153 5
13165 0
13165 0
13165 0
13174 5
13239 5
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
STOP DEPTH
14642 0
14642 0
14642 0
14642 0
14642 0
14642 0
14642 0
14642 0
14642 0
14642 0
14642 0
14642 0
14642 0
09-OCT-98
5.07
5.46
MEMORY
15066.0
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA P~AY
EWR4 ELECTROMAG. RESIS. 4
CNP COMPENSATED NEUTRON
SLD STABILIZED LITHO DEN
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMA~RKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
13233.0
15066.0
62.6
64.6
TOOL NUMBER
P1098HRLGM6
P1098HRLGM6
P1098HRLGM6
P1098HRLGM6
8.750
8.8
GEM G P
10.30
49.0
8.8
20000
3.2
.410
.185
.220
.560
73.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 3 API 4 1 68
RPX MWD 3 OHMM 4 1 68
RPS MWD 3 OHMM 4 1 68
RPM MWD 3 OHMM 4 1 68
RPD MWD 3 OHMM 4 1 68
FET MWD 3 HOUR 4 1 68
NPHI MWD 3 P.U. 4 1 68
NCNT MWD 3 CNTS 4 1 68
FCNT MWD 3 CNTS 4 1 68
ROP MWD 3 FT/H 4 1 68
RHOB MWD 3 G/CC 4 1 68
DRHO MWD 3 G/CC 4 1 68
PEF MWD 3 BARN 4 1 68
4
8
12
16
20
24
28
32
36
40
44
48
52
2
3
4
5
6
7
8
9
10
11
12
13
14
Name Min Max Mean
DEPT 13131 14642 13886.5
GR 43.47 503.19 157.882
RPX 1.22 14.06 3.85833
RPS 1.15 28.1 4.46248
RPM 0.92 1961.49 7.17314
RPD 0.95 1503.72 5.99448
FET 0.3686 25.6612 2.90926
NPHI 18.62 59.12 36.2918
NCNT 2184 3457 2641.35
FCNT 515 1038 691.256
ROP 10.6 445.19 126.499
RHOB 1.63 3.07 2.44278
DRHO -0.43 0.61 0.026423
PEF 2.44 12.48 4.66672
Ns am
3023
2936
2978
2978
2978
2978
2978
3023
3023
3023
2806
2955
2955
2955
First
Reading
13131
13174 5
13153 5
13153 5
13153 5
13153 5
13153 5
13131
13131
13131
13239.5
13165
13165
13165
Last
Reading
14642
14642
14642
14642
14642
14642
14642
14642
14642
14642
14642
14642
14642
14642
First Reading For Entire File .......... 13131
Last Reading For Entire File ........... 14642
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/02/02
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/02/02
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE N-UMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
FET 14642 5
RPD 14642 5
RPM 14642 5
RPS 14642 5
RPX 14642 5
GR 14642 5
ROP 14642 5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
STOP DEPTH
14660 5
14660 5
14660 5
14660 5
14660 5
14653 5
14700 0
17-0CT-98
5.07
5.46
MEMORY
14696.0
14671.0
14696.0
.0
.0
TOOL NUMBER
P01043GR4
P01043GR4
6.000
6.0
GEM GP
10.60
49.0
9.5
14000
3.0
.25O
.180
.200
71.4
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.28O
.0
Name Service Order
Units Size Nsam Rep
DEPT FT 4 1 68
GR MWD 4 API 4 1 68
RPX MWD 4 OHMM 4 1 68
RPS MWD 4 OHMM 4 1 68
RPM MWD 4 OHMM 4 1 68
RPD MWD 4 OHMM 4 1 68
FET MWD 4 HOUR 4 1 68
R0P MWD 4 FT/H 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
Name
DEPT
GR
RPX
RPS
RPM
RPD
FET
ROP
Min
14642.5
45 5386
0 3286
0 3945
0 5629
1 3848
4 2441
32.59
Max Mean Nsam
14700 14671.2 116
67.2166 56.6202 23
2000 54.5508 37
3.7328 0.677265 37
2000 545.792 37
2000 821.546 37
5.9036 4.99856 37
167.35 132.358 116
First
Reading
14642 5
14642 5
14642 5
14642 5
14642 5
14642 5
14642 5
14642 5
Last
Reading
14700
14653 5
14660 5
14660 5
14660 5
14660 5
14660 5
14700
First Reading For Entire File .......... 14642.5
Last Reading For Entire File ........... 14700
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/02/02
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/02/02
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NLIMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 14650.0
FET 14660.0
RPD 14660.0
RPM 14660.0
RPS 14660.0
RPX 14660.0
ROP 14700.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM A/qGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
STOP DEPTH
15119 5
15126 5
15126 5
15126 5
15126 5
15126 5
15203 5
19-0CT-98
5.07
5.46
MEMORY
15203.0
14696.0
15203.0
65.9
91.4
TOOL NUMBER
P01043GR4
P01043GR4
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
6.000
6.0
GEM GP
10.60
49.0
9.5
17000
2.2
.460
.175
.290
.560
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 5 API 4 1 68 4 2
RPX MWD 5 OHMM 4 1 68 8 3
RPS MWD 5 OHMM 4 1 68 12 4
RPM MWD 5 OHMM 4 1 68 16 5
RPD MWD 5 OHMM 4 1 68 20 6
ROP MWD 5 FT/H 4 1 68 24 7
FET MWD 5 HOUR 4 1 68 28 8
70.8
First
Name Min Max Mean Nsam Reading
DEPT 14650 15203.5 14926.8 1108 14650
GR 34.3211 143.564 55.5611 940 14650
RPX 0.8467 49.5222 25.0969 934 14660
Last
Reading
15203.5
15119.5
15126.5
RPS 1.0391 65.1478 34.8241 934
RPM 1.6623 86.7303 41.3661 934
RPD 2.337 167.744 48.9337 934
ROP 1.6364 585.324 30.2235 1007
FET 3.516 39.104 8.60056 934
14660
14660
14660
14700.5
14660
15126.5
15126.5
15126.5
15203.5
15126.5
First Reading For Entire File .......... 14650
Last Reading For Entire File ........... 15203.5
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/02/02
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 99/02/02
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 99/02/02
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File