Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutColville River, Qannik - ConocoPhillips Alaska, Inc.State of Alaska AOGCC Production Files Year: 2018 Field &Pool: COLVILLE RIVER, QANNIK Operator: CONOCOPHILLIPS AK Field Name Qannik Well Cm p Field Prod Prod Tbg Press Daily Daily Daily Total OBI Total Total Number Api Number Type Code Method Days Average Oil Water Gas Water Gas CD2-463 501032057700 1 120180 8 0 0 0 0 0 0 0 0 CD2-464 501D32057400 1 120180 2 31 197 350 16 198 10843 499 6145 CD2-465 501032058300 1 120180 2 31 200 251 66 91 7789 2057 2820 CD2-468 501032058700 1 120180 2 16 200 340 71 191 5438 1134 3053 CD2-469 501032058000 1 120180 2 31 196 248 85 126 7694 2621 3921 CD2-470 501032058100 1 120180 2 31 200 196 47 122 6063 1447 3777 Sum: 37827 7758 19716 Field flame: Qannik Well Cmp, Field Inj Injection Tbg Press Tbg Press CSG Press CSG Press Daily Daily Number Api Number Type Code Method Days Maximum Average Maximum Average Liquid Gas CD2-404 501032053000 4 120180 6 31 1,647 1,518 400 302 683 0 CD2-466 501032057600 4 120180 6 31 1,566 1,501 647 585 693 0 CD2-467 501032057900 4 120180 6 31 1,652 1,546 951 677 697 0 Sum: Total Total Liquid Gas 21158 0 21477 D 21619 0 64254 0 CONFIDENTIAL pursuant to: AS 43.05230. AS 4025.100, AS 38.05.035 (a)(8), and AS 38.05-036 m. COr10C0 hi11ipS ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION AND INJECTION REPORT QANNIK PARTICIPATING AREA QANNIK (CD21 RECONCILIATION PRODUCTION MONTH Jan-18 TOTAL PIPELINE DELIVERIES FOR ALYESKA FROM ALPINE 2,056,218 LESS LOAD OIL 684 LESS OUTSIDE TRACT EXPLORATORY - ALPINE DELIVERIES (CD1, CO2, CD4. 3CD5) 1,285,214 FIORD-KUPARUK DELIVERIES (CD3) 23.014 FIORD-NECHELIK DELIVERIES (CO3) 190,983 NANUQ-KUPARUK DELIVERIES (C04) 456,089 NANUQ-NANUQ DELIVERIES (CD4) 36,409 QANNIK OELNERIES (CO2) 37.827 DEVELOPMENT (CRIB; C01-17) 12,66D DEVELOPMENT (CR17; C01-04) 12,748 DEVELOPMENT(CR24) 590 DEVELOPMENT (CR25) - DEVELOPMENT (CR28) ' DEVELOPMENT (CD5-316) ' NET PIPELINE DELIVERY PLUS LEASE USE CRUDE PLUS INJECTED SLP LESS NGLS TO PIPELINE 37.827 TOTAL NET ALLOCATED PRODUCTION QANNIK (CO2) 37.827 FORM 10-405 IHE YCERTIFY THAT H FOREG01 IG STAT NTS ARETRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. ��A �—__—Revenueand Regulatory Analyst Diane Hendrickson Printed Name of Signer Operator: ConocoPhillips Alaska Inc. Production Month: Feb - 2018 Well Ap i Number Cmp Field Prod Prod Tbg Press Daily Daily Daily Total Number Type Code Method Days Average Oil Water Gas Total Oil Water Field Name Qannik Revised 8/16/18 Total Gas Well Api Number Cmp, Field Prod Prod Tbg Press Daily Daily Daily Total Oil Total Total Number Type Code Method Days Average Oil Water Gas Water Gas CD2-463 501032057700 1 120180 8 0 0 0 0 CD2-464 501032057400 1 120180 2 28 200 331 12 CD2-465 501032058300 1 120180 2 28 203 226 59 CD2-468 501032058700 1 120180 2 2 200 216 53 CD2-469 501032058000 1 120180 2 28 199 213 71 CD2-470 501032058100 1 120180 2 25 205 132 37 0 0 0 0 239 9266 329 6689 156 6321 1659 4366 263 431 106 526 159 5957 1975 4450 141 3311 930 3523 Sum: 25286 4999 19554 Page 8 of 14 Operator: ConocoPhillips Alaska Inc. Production Month: Feb - 2018 Revised 8/16/18 Well Cmp Field Inj Injection Tbg Press Tbg Press CSG Press CSG Daily Daily Total Total Number Api Number Type Code Method Days Maximum Average Maximum Press Liquid Gas Liquid Gas Average Field Name: Qannik Well Cmp Field Inj Injection Tbg Press Tbg Press CSG Press CSG Daily Daily Total Total Number Api Number Type Code Method Days Maximum Average Maximum Press Liquid Gas Liquid Gas Average CD2-404 501032053000 4 120180 6 26 1,661 1,528 350 154 710 0 18459 CD2-466 501032057600 4 120180 6 28 1,570 1,557 603 577 685 0 19187 CD2-467 501032057900 4 120180 6 28 1,614 1,604 941 770 672 0 18814 Sum: 56460 0 0 0 0 Page 14 of 14 Field blame Qannik Well Ap i Number Cmp Field Prod Prod Tbg Press Daily Daily Daily Total Total Number Type Code Method Days Average Oil Water Gas Total Oil Water Gas CD2-463 501032057700 1 120180 8 0 0 0 0 0 0 CD2-464 501032057400 1 120180 2 28 200 319 13 234 8941 CD2-465 501032059300 1 120180 2 28 203 223 60 154 6254 CD2-468 501032058700 1 120180 2 2 200 209 43 104 417 CD2-469 501032058000 1 120180 2 28 199 248 84 177 6954 CD2-470 501032058100 1 120180 2 25 205 130 38 139 3255 Sum- 25821 014, Waft Ct r-� 0 0 360 6541 1666 4325 86 207 2339 4961 939 3474 5390 19508 Field Name: Qannik Well Api Number Cmp Field Inj Injection Tbg Press Tbg Press CSG Press CSG Daily Daily Total Total Number Type Code Method Days Maximum Average Maximum Press Liquid Gas Liquid Gas Average CD2-404 501032053000 4 120180 6 26 1,661 1,528 350 154 710 0 18459 0 CD2-466 501032057600 4 120180 6 28 1,570 1,557 603 577 685 0 19187 0 CD2-467 501032057900 4 120180 6 28 1,614 1,604 941 770 672 0 18814 0 Sum: 56460 0 i�� f/zd � - Operator: ConocoPhillips Alaska Inc. Production Month: Mar - 2018 Revised 8/16/18 Well Number Ap i Number Cmp Type Field Code Prod Method Prod Days Tbg Press Average Daily Oil Daily Water Daily Gas Total Oil Total Water Total Gas Field Name Qannik Well Cmp Field Prod Prod Tbg Press Daily Daily Daily Total Total Number Api Number Type Code Method Days Average Oil Water Gas Total Oil Water Gas CD2-463 501032057700 1 120180 8 0 0 0 0 0 0 0 0 CD2-464 501032057400 1 120180 2 31 201 298 8 279 9240 236 8636 CD2-465 501032058300 1 120180 2 31 203 205 50 203 6366 1562 6300 CD2-468 501032058700 1 120180 2 25 212 270 50 347 6758 1245 8678 CD2-469 501032058000 1 120180 2 31 199 225 76 240 6985 2367 7454 CD2-470 501032058100 1 120180 2 13 210 129 33 176 1673 434 2287 Sum: 31022 5844 33355 Page 8 of 14 Operator: ConocoPhillips Alaska Inc. Production Month: Mar - 2018 Revised 8/16/18 Well Cmp Field Inj Injection Tbg Press Tbg Press CSG Press CSG Daily Daily Total Total Number Api Number Type Code Method Days Maximum Average Maximum Press Liquid Gas Liquid Gas Average Field Name: Qannik Well Api Number Cmp Field Inj Injection Tbg Press Tbg Press CSG Press Press Daily Daily Total Total Number Type Code Method Days Maximum Average Maximum Average Liquid Gas Liquid Gas CD2-404 501032053000 4 120180 6 19 1,619 1,559 900 510 CD2-466 501032057600 4 120180 6 31 1,642 1,513 683 557 CD2-467 501032057900 4 120180 6 31 1,690 1,564 965 842 837 0 15895 725 0 22477 724 0 22445 Sum: 60817 0 0 0 0 Page 14 of 14 Field Name Qannik Well Number Api Number Cmp Type Field Code Prod Method Prod Days Tbg Press Average Daily Oil Daily Water Daily Gas Total Oil Total Water Total Gas CD2-463 501032057700 1 120180 8 0 0 0 0 0 0 0 0 CD2-464 501032057400 1 120180 2 31 201 298 8 277 9246 246 8577 CD2-465 501032058300 1 120180 2 31 203 204 50 201 6325 1559 6234 CD2-468 501032058700 1 120180 2 25 212 289 43 328 7223 1071 8206 CD2-469 501032058000 1 120180 2 31 199 223 78 236 6917 2407 7306 CD2-470 501032058100 1 120180 2 13 210 128 33 178 1665 429 2309 Sum: 31376 5712 32632 PH . ; .r' . Field Name: Qannik Well Api Number Cmp Field Inj Injection Tbg Press Tbg Press CSG Press press Daily Daily Number Type Code Method Days Maximum Average Maximum Liquid Gas Average CD2-404 501032053000 4 120180 6 19 1,619 1,559 900 510 837 0 CD2-466 501032057600 4 120180 6 31 1,642 1,513 683 557 725 0 CD2467 501032057900 4 120180 6 31 1,690 1,564 965 842 724 0 Sum: 06;L% AAA AS Total Total Liquid Gas 15895 22477 22445 60817 0 0 a a uu, A. a =.V30 M As), Ono As as.05.035 (t). COt'tc'aCOPI-�i1Gp5 ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION AND INJECTION REPORT OANNIK PARTICIPATING AREA QANNIK (CD2) RECONCILIATION PRODUCTION MONTH Mar.18 TOTAL PIPELINE DELIVERIES FOR ALYESKA FROM ALPINE 2,021,838 LESS LOAD OIL 4,438 LESS OUTSIDE TRACT EXPLORATORY ALPINE DELIVERIES (001. 002. G04, & COS) 1.266,018 FIORD-KUPARUK DELIVERIES (CD3) 12.717 FIORDWECHELIK DELIVERIES (CM) 199,369 NANUO-KUPARUK DELIVERIES (CD4) 444,211 NANUO-NANUO DELIVERIES (CD4) 30,489 CANNIK DELIVERIES (CD2) 31,37E DEVELOPMENT (CR16; C01-17) 11.363 DEVELOPMENT (CR17; C01.04) 14,838 DEVELOPMENT (CR24) 520 DEVELOPMENT (CR25) - DEVELOPMENT (CR25) - EXPLORATORY 7,537 NET PIPELINE DELIVERY PLUS LEASE USE CRUDE PLUS INJECTED SUP LESS NGLS TO PIPELINE TOTAL NET ALLOCATED PRODUCTION DANNIK (CD2) 31.376 31,376 FORM 10-405 I H R l�'P)�Fiy F TRAT T REGOIN T T- T/�R2� AND CORRECT TO THE BEST OF MY KNOWLEDGE. f�/J, /(J� % ! Revenue and RegWatoryAnOW Diane Hendrickson Printed Name OfSigner Operator: ConocoPhillips Alaska Inc. Production Month: Apr - 2018 Revised 8/16/18 Well Number Ap i Number Cmp Type Field Code Prod Method Prod Days Tbg Press Average Daily Oil Daily Water Daily Gas Total Oil Total Water Total Gas Field Name Qannik Well Api Number Cmp Field Prod Prod Tbg Press Daily Daily Daily Total Oil Total Total Number Type Code Method Days Average Oil Water Gas Water Gas CD2-463 501032057700 1 120180 2 23 223 783 240 758 18010 5528 17429 CD2-464 501032057400 1 120180 2 30 204 293 9 292 8792 266 8751 CD2-465 501032058300 1 120180 2 30 208 196 48 267 5872 1433 7999 CD2-468 501032058700 1 120180 2 30 211 180 37 360 5404 1109 10792 CD2-469 501032058000 1 120180 2 30 203 225 64 277 6744 1921 8298 CD2-470 501032058100 1 120180 2 30 222 147 49 195 4423 1478 5847 Sum: 49245 11735 59116 Page 8 of 14 Operator: ConocoPhillips Alaska Inc. Production Month: Apr - 2018 Revised 8/16/18 Well Api Number Cmp Field Inj Injection Tbg Press Tbg Press CSG Press Press Daily Daily Total Total Number Type Code Method Days Maximum Average Maximum Average Liquid Gas Liquid Gas Field Name: Qannik Well Api Number Cmp Field Inj Injection Tbg Press Tbg Press CSG Press Press Daily Daily Total Total Number Type Code Method Days Maximum Average Maximum Liquid Gas Liquid Gas Average CD2-404 501032053000 4 120180 6 23 1,663 1,510 1000 619 CD2-466 501032057600 4 120180 6 30 1,687 1,536 674 577 CD2-467 501032057900 4 120180 6 30 1,684 1,542 895 745 861 0 19805 0 844 0 25331 0 701 0 21038 0 Sum: 66174 0 Page 14 of 14 Field Name Qannik Well Number Api Number Cmp Type Field Code Prod Method Prod Days Tbg Press Average Daily Oil Daily Water Daily Gas Total Oil Total Water Total Gas CO2-463 501032057700 1 120180 2 23 223 782 246 757 17996 5647 17419 CD2-464 501032057400 1 120180 2 30 204 293 9 291 8786 266 8736 CD2-465 501032058300 1 120180 2 30 208 196 48 267 5873 1433 7999 CD2-468 501032058700 1 120180 2 30 211 177 37 343 5296 1103 10299 CD2-469 501032058000 1 120180 2 30 203 225 64 276 6737 1916 8282 CD2-470 501032058100 1 120180 2 30 222 148 49 195 4431 1480 5853 Sum: 49119 11845 58588 Field Name: Qannik Well Api Number Cmp Field Inj Injection Tbg Press Tbg Press CSG Press Press Daily Daily Number Type Code Method Days Maximum Average Maximum Liquid Gas Average CD2-404 501032053000 4 120180 6 23 1,663 1,510 1000 619 861 0 002-466 501032057600 4 120180 6 30 1,687 1,536 674 577 844 0 CD2-467 501032057900 4 120180 6 30 1,684 1,542 895 745 701 0 Sum: Total Total Liquid Gas 19805 25331 21038 66174 0 0 0 0 Well AP i Number Cmp Field Prod Prod Tbg Press Daily Daily Daily Total Total Gas �vNumber Type Code Method Days Average Oil Water Gas Total Oil Water �I 1" Field Name Qannik Well Api Number Cmp Field Prod Prod Tbg Press Daily Daily Daily Total Oil Total Total Number Type Code Method Days Average Oil Water Gas Water Gas CD2-463 501032057700 1 120180 2 31 211 774 34 801 24007 1043 24836 CD2-464 501032057400 1 120180 2 31 204 282 13 273 8744 414 8458 CD2-465 501032058300 1 120180 2 31 210 184 46 197 5719 1420 6095 CD2-468 501032058700 1 120180 2 16 254 188 42 464 3008 675 7424 CD2-469 501032058000 1 120180 2 31 204 225 51 250 6969 1571 7735 CD2-470 501032058100 1 120180 2 31 215 119 37 195 3684 1148 6051 Sum: 52131 6271 60599 Well Api Number Cmp Field Inj Injection Tbg Press Tbg Press CSG Press Press Daily Daily Total Total Number Type Code Method Days Maximum Average Maximum Average Liquid Gas Liquid Gas Field Name: Qannik Well Api Number Cmp Field Inj Injection Tbg Press Tbg Press CSG Press CSG Press Daily Daily Total Total Number Type Code Method Days Maximum Average Maximum Liquid Gas Liquid Gas Average CD2-404 501032053000 4 120180 6 31 1,598 1,364 900 682 684 0 21197 0 CD2-466 501032057600 4 120180 6 31 1,558 1,513 693 574 811 0 25147 0 CD2-467 501032057900 4 120180 6 31 1,659 1,504 902 750 582 0 18038 0 Sum: 64382 0 ConOC-37i llips lu�.lne. ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION AND INJECTION REPORT QANNIK PARTICIPATING AREA QANNIK (CD21 RECONCILIATION PRODUCTION MONTH May-18 TOTAL PIPELINE OELNERIES FOR ALYESKA FROM ALPINE 2.037.371 LESS LOAD OIL 886 LESS GREATER MOOSES TOOTH 1.611 ALPINE DELIVERIES (CD1, CD2. CD4, 6 COS) 1,285,294 FIORD-KUPARUK DELIVERIES (CD3) 16,889 FIORD-NECHELIK DELIVERIES (CD3) IDZ573 NANUQ-KUPARUK DELIVERIES (CD4) 420,S31 NANUQ-NANUQ DELIVERIES (CD4) 43,443 QANNIK DELIVERIES (CD2) S%131 DEVELOPMENT (CR1S; CD1.17) 10.740 DEVELOPMENT (Cl CDI.04) IZ626 DEVELOPMENT (CR24) 686 DEVELOPMENT Cl 82 DEVELOPMENT (OR28) EXPLORATORY - NET PIPELINE DELIVERY PLUS LEASE USE CRUDE PLUS INJECTED SLP LESS NGLS TO PIPELINE 52,131 TOTAL NET ALLOCATED PRODUCTION QANNIK (CO2) 62,131 FORM 10.405 I HEREER-nFYrTHHAAT-TH F EGOINGSATEMENTS ARE TRUEAND CORRECT TO THE BEST OF MY KNOWLEDGE. Revenue and Regulatory Analyst -Dane Hendrickson P &rted Name of8ignK Field Name Qannik Well Number Ap i Number Cmp Type Field Code Prod Method Prod Days Tbg Press Average Daily Oil Daily Water Daily Gas Total Oil Total Water Total Gas CD2-463 501032057700 1 120180 2 30 218 654 30 741 19624 893 22221 CD21464 501032057400 1 120180 2 30 205 270 14 268 8113 417 8026 CD2-465 501032058300 1 120180 2 30 214 213 55 190 6385 1648 5694 CD2-468 501032058700 1 120180 2 13 260 114 225 282 1485 2921 3409 CD2-469 501032058000 1 120180 2 30 209 222 98 282 6665 2942 8459 CD2-470 501032058100 1 120180 2 30 213 128 44 203 3841 1306 6089 Sum: 46113 10127 53898 Field Name: Qannik Well AP i Number CmP Field Inj Injection Tbg Press Tbg Press CSG Press CSG Daily Daily Total Total Number Type Code Method Days Maximum Average Maximum Press Liquid Gas Liquid Gas overage CD2-404 501032053000 4 120180 6 23 1,538 1,326 685 446 703 0 16173 0 CD2-466 501032057600 4 120180 6 30 1,584 1,548 863 721 967 0 29023 0 CD2-467 501032057900 4 120180 6 30 1,641 1,520 814 314 663 0 19880 0 Sum: 65076 0 Cor►ocoPhillips ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION AND INJECTION REPORT OANNIK PARTICIPATING AREA QANNIK (CD2) RECONCILIATION PRODUCTION MONTH Jun4s TOTAL PIPELINE DELIVERIES FOR ALYESKA FROM ALPINE 1,882.777 LESS LOAD OIL 468 LESS GREATER MOOSES TOOTH 3,168 ALPINE DELIVERIES (CD1, CO2, C04, 8 COS) 1,214,255 FIORD-KUPARUK DELIVERIES (CO3) 14,168 FIORD-NECHELIK DELIVERIES (CD3) 158,325 NANUQ-K JPARUK DELIVERIES (CD4) 385,088 NANUQ-NANUQ DELIVERIES (CO4) 38,034 CANNIK DELJVEFUES (CD2) 46,113 DEVELOPMENT (CRIB; CD1-17) 9.836 DEVELOPMENT (CR17; CDI-04) 12,698 DEVELOPMENT(CR24) 483 DEVELOPMENT(CR25) 144 DEVELOPMENT(CR28) - EXPLORATORY - NET PIPELINE DELIVERY PLUS LEASE USE CRUDE PLUS INJECTED SLP LESS NGLS TO PIPELINE 46,113 TOTAL NET ALLOCATED PRODUCTION QANNIK (01)2) 46,113 FORM 10-465 I HER Y�TEGOI•��EM/TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. Revenue and Regulatory Anoyet Diane Hendrickson Printed Name of Signer July 2018 Field Name Qannik Well Api Number Cmp Field Prod Prod Tbg Press Daily Daily Daily Total Oil Total Total Number Type Code Method Days Average Oil Water Gas Water Gas CD2-463 501032057700 1 120180 2 12 212 619 22 CD2-464 501032057400 1 120180 2 12 203 291 9 CD2-465 501032058300 1 120180 2 12 211 223 67 CD2-468 501032058700 1 120180 2 11 204 230 254 CD2-469 501032058000 1 120180 2 12 207 217 76 CD2-470 501032058100 1 120180 2 12 213 117 17 713 7426 273 3486 236 2674 375 2534 245 2609 216 1406 Sum: 20135 262 8552 106 3276 808 2835 2792 4130 912 2943 205 2591 5085 24327 July 2018 Field Name: Qannik Well Api Number Cmp Field Inj Injection Tbg Press Tbg Press CSG Press Press Daily Daily Total Total Number Type Code Method Days Maximum Average Maximum Liquid Gas Liquid Gas Average CD2-404 501032053000 4 120180 8 0 0 0 10 10 0 0 0 0 CD2-466 501032057600 4 120180 6 10 1,540 1,527 703 339 954 0 9544 0 CD2-467 501032057900 4 120180 6 12 1,618 1,522 453 157 645 0 7742 0 Sum: 17286 0 V Coo ncaPhillips ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION AND INJECTION REPORT QANNIK PARTICIPATING AREA OANNIK(CD2) RECONCILIATION PRODUCTION MONTH Jul-16 TOTAL PIPELINE DELIVERIES FOR ALYESKA FROM ALPINE 744,289 LESS LOAD OIL - LESS GREATER MOOSES TOOTH - ALPINE DELIVERJES (CD1. CDZ CO4, & C05) 475,130 FIORD-KUPARUK DELIVERIES (CD3) 5,335 FIORD-NECHELIK DELIVERIES (CD3) 86,738 NANUO-KUPARUK DELIVERIES (CD4) 163,109 NANUO-NANUO DELIVERIES (CD4) 15,742 OANNIK DELIVERIES (CO2) 2C,135 DEVELOPMENT (CR16-, CD1-17) 3,953 DEVELOPMENT (CR17; CDt-04) 4,D53 DEVELOPMENT(CR24) 196 DEVELOPMENT (CR25) - DEVELOPMENT (CR28) - E)CPLORATORY - NET PIPELINE DELIVERY PLUS LEASE USE CRUDE PLUS INJECTED SLP LESS NGLS TO PIPELINE 20,135 TOTAL NET ALLOCATED PRODUCTION OANNIK (CD2) 2D,135 FORM 10-405 1 HEREBY E/RR//TTT�jYIIyrF��yY THAAJT THE GOING ST TEMENTS E TRUE AND CORRECT TO THE HEST OF MY KNOWLEDGE. 4G/t,�fu �� Revenue and Regulatory Analyst Diane Hendrickson Pdrlted Name of Signer August2018 Well ACmp Field Prod Prod Tbg Press Daily Daily Number pi Number Type Code Method Days Average Oil Water Field Name Qannik Well Api Number Cmp Field Prod Prod Tbg Press Daily Daily Number Type Code Method Days Average Oil Water CD2-463 501032057700 1 120180 2 16 212 769 13 CD2-464 501032057400 1 120180 2 19 199 417 3 CD2-465 501032058300 1 120180 2 18 204 280 66 CD2-468 501032058700 1 120180 2 17 263 489 132 CD2-469 501032058000 1 120180 2 18 211 390 75 CD2-470 501032058100 1 120180 2 18 207 193 40 Daily Total Oil Total Total Gas Water Gas Daily Gas Total Oil Total Water Total Gas 593 12296 207 9494 240 7926 65 4562 113 5043 1195 2031 358 8313 2238 6089 228 7015 1352 4106 113 3470 725 2025 Sum: 44063 5782 28307 August 2018 Well Api Number Cmp Field Inj Injection Tbg Press Tbg Press CSG Press Press Daily Daily Total Total Number Type Code Method Days Maximum Average Maximum Average Liquid Gas Liquid Gas Field Name: Qannik Well Api Number Cmp Field Inj Injection Tbg Press Tbg Press CSG Press Press Daily Daily Total Total Number Type Code Method Days Maximum Average Maximum Liquid Gas Liquid Gas Average C1)2-404 501032053000 4 120180 6 15 1,640 1,408 1000 275 1,077 0 16162 0 CO2.466 501032057600 4 120180 6 10 1,577 1,478 1242 398 1,390 0 13897 0 CD2-467 501032057900 4 120180 6 18 1,610 1,496 1153 294 975 0 17545 0 Sum: 47604 0 Conoc4aPhiAi ps ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION AND INJECTION REPORT QANNIK PARTICIPATING AREA QANNIK (CO21 RECONCILIATION PRODUCTION MONTH Aug-19 TOTAL PIPELINE DELIVERIES FOR ALYESKA FROM ALPINE 1,293,858 LESS LOAD OIL 2,958 LESS GREATER MOOSES TOOTH 2,393 ALPINE DELIVERIES (001, OD2, C04, & CD5) 807.162 FiORDa(UPARUK DELIVERIES (CD3) FIORD-NECHELIK DELIVERIES (OD3) 123.323 NANUQ-KUPARUK DELIVERIES (CD4) 267,690 NANUO-NANUO DELIVERIES (CD4) 28,276 OANNIK DELIVERIES (CD2) 44.063 DEVELOPMENT (CR16, CD1-17) 10,004 DEVELOPMENT (CR17; =1-04) 7,614 DEVELOPMENT(CR24) 375 DEVELOPMENT(CR25) DEVELOPMENT(CR28) EXPLORATORY NET PIPELINE DELIVERY PLUS LEASE USE CRUDE PLUS INJECTED SLP LESS NGLS TO PIPELINE 44,063 TOTAL NET ALLOCATED PRODUCTION QANNIK (CO2) 44,063 FORM 10-405 I HERE FOREGO NG STAT AEM"5 ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. 4WAV,��// �xxJJ ° Revenue and Regulatory Analyst Diane Hendrickson __ _ Printed Name of Signer September 2018 Well Ap i Number Cmp Field Prod Prod Tbg Press Daily Daily Daily Total Number Type Code Method Days Average Oil Water Gas Total Oil Water Total Gas Field Name Qannik Well Ap i Number Cmp Field Prod Prod Tbg Press Daily Daily Daily Total Total Number Type Code Method Days Average Oil Water Gas Total Oil Water Gas CD2-463 501032057700 1 120180 2 30 208 722 29 613 21652 864 18376 CD2-464 501032057400 1 120180 2 30 202 387 5 230 11606 143 6901 CD2-465 501032058300 1 120180 2 30 204 265 45 125 7945 1360 3749 CD2-468 501032058700 1 120180 2 30 206 558 124 450 16754 3710 13504 CD2-469 501032058000 1 120180 2 30 203 293 82 169 8778 2463 5068 CD2-470 501032058100 1 120180 2 30 206 159 61 114 4767 1822 3412 Sum: 71502 10362 51010 Page 8 of 8 September 2018 Well Api Number Cmp Field Inj Injection Tbg Press Tbg Press CSG Press Press Daily Daily Total Total Number Type Code Method Days Maximum Average Maximum average Liquid Gas Liquid Gas Field Name: Qannik Well Cmp Field Inj Injection Tbg Press Tbg Press CSG Press CSG Daily Daily Total Total Number Api Number Type Code Method Days Maximum Average Maximum Press Liquid Gas Liquid Gas Average CD2-404 501032053000 4 120180 6 27 1,589 1,469 1050 CD2-466 501032057600 4 120180 6 30 1,579 1,539 767 CD2-467 501032057900 4 120180 6 30 1,619 1,504 511 Page 6 of 6 844 848 0 22900 0 620 1,154 0 34614 0 330 759 0 22778 0 Sum: 80292 0 Conoc Phillips Al-, Ins, ALYSKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION AND INJECTION REPORT QANNIK PARTICIPATING AREA OANNIK (CD2) RECONCILIATION PRODUCTION MONTH Sep-18 TOTAL PIPELINE DELIVERIES FOR ALYESKA FROM ALPINE 2,028,851 LESS LOAD OIL 455 LESS GREATER MOOSES TOOTH 1,458 ALPINE DELIVERIES (CD1, CD2, CD4, 6 COS) 1,282,749 FIORD-KUPARUK DELIVERIES (CD3) 8,012 FIORD•NECHEUK DELIVERIES (CD3) 187.172 NANUQ•KUPARUK DELIVERIES (CD4) 406,166 NANUQ-NANUQ DELIVERIES (CD4) 46,380 QANNIK DELIVERIES (CD2) 71,502 DEVELOPMENT (CR16: CD7-17) 11,431 DEVELOPMENT (CR17; C01-04) 12,874 DEVELOPMENT (CR24) 55p DEVELOPMENT (CR25) _ DEVELOPMENT(CR28) _ EXPLORATORY _ NET PIPELINE DELIVERY PLUS LEASE USE CRUDE PLUS INJECTED SLP LESS NGLS TO PIPELINE 71,502 TOTAL NET ALLOCATED PRODUCTION QANMK (CD2) 71,502 FORM 10-405 1 IHEREB71 %IFYr K.THAT THE %FgFF-GOOING SS TTEMENTS�AR�EE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. � Revenue and Regulatory Anatysf Diane Hendrickson Printed Name of Signer Well NumberApi NumberCmp TypeField CodeProd MethodProd DaysTbg Press AverageDaily OilDaily Water Daily Gas Total Oil Total Water Total GasCD2-463501032057700 11201802 31 205 661 29 615 20490 910 19074CD2-464501032057400 11201802 31 201 373 4 212 11571 131 6559CD2-465501032058300 11201802 31 204 224 45 106 6945 1384 3273CD2-468501032058700 11201802 31 205 493 105 415 15282 3242 12865CD2-469501032058000 11201802 31 202 267 79 182 8286 2457 5635CD2-470501032058100 11201802 31 209 135 44 99 4171 1364 3060Sum: 66745 9488 50466Field Name Qannik Well Name ApiInj Compl Type Field Code Inj MethodInjection DaysTbg Press MaximumTbg Press AverageCSG Press MaximumCSG Press AverageDaily Liquid Daily GasTotal Liquid Total GasCD2-404501032053000 41201806 11 1,401 1,345 750 479 564 0 6200 0CD2-466501032057600 41201806 31 1,613 1,519 860 610 1085 0 33632 0CD2-467501032057900 41201806 31 1,637 1,549 750 279 668 0 20715 0Sum: 60547 0Field Name: Qannik            !"#$ ##% "$!"!"" !"&"#""" "&"#                                                                                                                    "0")  "0")       +3 +3 !"#$ ##"4 $ ##% "$-& ##"4 -& ##% "$!",/  !"&"#",/  "&"#                                                                            '    '       !                           ! "# #       "       $  #%"# #        #%"  #%      $%       !!    !& " !    & " $     !     "    $ "'  "     ""&#  #  # "#  (  "    "      ' ""& " )        #  )  * +  ,-,./,0.1 ,2/304567.03784 69.4,1 0:,5; 92.,6 REVISED Field Name Qannik Well Ap i Number Cmp Field Prod Prod Tbg Press Daily Daily Daily Total Total Number Type Code Method Days Average Oil Water Gas Total Oil Water Gas CD2-463 501032057700 1 120180 2 31 205 664 29 590 20598 910 18284 CD2-464 501032057400 1 120180 2 31 201 375 4 203 11629 131 6293 CD2-465 501032058300 1 120180 2 31 204 225 45 101 6978 1383 3145 CD2-468 501032058700 1 120180 2 31 205 495 105 398 15360 3241 12339 CD2-469 501032058000 1 120180 2 31 202 269 79 174 8326 2457 5404 CD2-470 501032058100 1 120180 2 31 209 135 44 95 4193 1364 2942 Sum: 67084 9486 48407 Page 8 of 8 REVISED Field Name: Qannik Well Ai Number p Cmp Field Inj Injection Tbg Press Tbg Press CSG Press Press Daily Daily Total Total Number Type Code Method Days Maximum Average Maximum Liquid Gas Liquid Gas Average CD2-404 501032053000 4 120180 6 11 1,401 1,345 750 479 564 0 6200 0 CD2-466 501032057600 4 120180 6 31 1,613 1,519 860 610 1,085 0 33632 0 CD2-467 501032057900 4 120180 6 31 1,637 1,549 750 279 668 0 20715 0 Sum: 60547 0 Page 6 of 6 Cc>nacoPl�illips ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION AND INJECTION REPORT QANNIK PARTICIPATING AREA QANNIK (CD21 RECONCILIATION PRODUCTION MONTH Oct•18 TOTAL PIPELINE DELIVERIES FOR ALYESKA FROM ALPINE 2,172.702 LESS LOAD OIL 2050 LESS GREATER MOOSES TOOTH 240:567 ALPINE DELIVERIES (CDt, CD2, CD4, & 005) 1,171,486 FIORD-KUPARUK DELIVERIES (CD3) 12,342 FIORD-NECHEUK DELIVERIES (CD3) 190,398 NANUQ-KUPARUK DELIVERIES (C04) 417,161 NANUO-NANUQ DELIVERIES (CD4) 45,744 OANNIIC DELIVERIES (CD2) 67,084 DEVELOPMENT (CR161 CD1-17) 11,658 DEVELOPMENT (CR17; CD1-04) 12.552 DEVELOPMENT(CR24) 661 DEVELOPMENT(CR25) _ DEVELOPMENT(CR28) - EXPLORATORY _ NET PIPELINE DELIVERY 67.084 PLUS LEASE USE CRUDE _ PLUS INJECTED SUP _ LESS NGLS TO PIPELINE _ TOTAL NET ALLOCATED PRODUCTION QANNIK (002) 67,084 FORM 10.406 I HEREBY C TIF� E FOFEGOING STATEMENTS ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. Revenue and Regulatory Analyst Diane Hendrickson Printed Name of Signer Field Name Qannik Well A i Number p Gmp Field Prod Prod Tbg Press Daily Daily Daily Total Total Number Type Code Method Days Average Oil Water _Gas Total Oil Water Gas CD2-463 501032057700 1 120180 2 31 205 664 29 579 20580 910 17946 CD2-464 501032057400 1 120180 2 31 201 375 4 199 11621 133 6174 CD2-465 501032058300 1 120180 2 31 204 219 44 95 6779 1358 2950 CD2-468 501032058700 1 12018C 2 31 205 495 105 391 15349 3240 12124 CD2-469 501032058000 1 120180 2 31 202 268 80 171 8310 2465 5290 CD2-470 501032053100 1 120180 2 31 209 130 46 89 4028 1420 2770 Sum. 66667 9526 47254 N,wt��`��SEUE� Field dame: Clannik Well Ai Humber Cmp Field Inj Injection Tbg Press Tbg Press CSG Press CSG Daily Daily Total Total Number p Type Code Method Days Maximum Average Maximum Press Liquid Gas Liquid Gas Average CD2-404 501032053000 4 120180 6 11 1,401 1,345 750 479 564 0 6200 0 CD2-466 501032057600 4 120180 6 31 1,613 1,519 860 610 1,085 0 33632 0 CD2-467 501032057900 4 120180 6 31 1,637 1,549 750 279 668 0 20715 0 Sum: 60547 0 -BED rs_l U P F, CanocoPhil[ips ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION AND INJECTION REPORT QANNIK PARTICIPATING AREA QANNIK (CD2) RECONCILIATION PRODUCTION MONTH Oct-18 TOTAL PIPELINE DELIVERIES FOR ALYESKA FROM ALPINE LESS LOAD OIL LESS GREATER MOOSES TOOTH ALPINE DELIVERIES (CD1, CD2. CD4, & C05) FIORD-KUPARUK DELIVERIES (CD3) FIORD-NECHELIK DELIVERIES (CD3) NANUO-KUPARUK DELIVERIES (CD4) NANUO-NANUO CELtVFRIES (CD4) QANNIK DELIVERIES (CD2) DEVELOPMENT (CR16; CD1-17) DEVELOPMENT (CR17; CD1-04) DEVELOPMENT(CR24) DEVELOPMENT(CR25) ➢EVELOPMENT(CR28) EXPLORATORY NET PIPELINE DELIVERY PLUS LEASE USE CRUDE PLUS INJECTED SLP LESS NGLS TO PIPELINE TOTAL NET ALLOCATED PRODUCTION QANNIK (CD2) 2,172,702 2,059 240,367 1,171,858 13,330 190,249 417,694 45,705 66,667 11,651 12.543 659 A 66,667 66,667 FORM 10--4005 11 HEREB ffFY T AT IN OREGOT TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE, ff��jjJJ44��66j V Revenue and Regulatory Analyst Diane Hendrickson Printed Name of Signer jorl i 7, EO            !"#$%&$'"%($#)!  0 * + + , ! - ,+.  .-   -  * -   ,  , * ,                                                                                                                CONOCOPHILLIPS ALASKA INCAlaska Oil And Gas Conservation CommissionMonthly Injection ReportOperator: ConocoPhillips Alaska Inc.Production Month: Nov - 2018 Form : 10-406Well NameApiInj Compl TypeField CodeInj MethodInjection DaysTbg Press MaximumTbg Press AverageCSG Press MaximumCSG Press AverageDaily LiquidDaily GasTotal LiquidTotal GasCD2-404501032053000 41201808 0 0 0 220 220 0 0 0 0CD2-466501032057600 41201806 30 1,585 1,441 910 523 957 0 28712 0CD2-467501032057900 41201806 30 1,627 1,457 1164 747 534 0 16031 0Sum: 44743 0Field Name: Qannik &212&23+,//,36$/$6.$,1&$ODVND2LO$QG*DV&RQVHUYDWLRQ&RPPLVVLRQ0RQWKO\,QMHFWLRQ5HSRUW)RUP2SHUDWRU&RQRFR3KLOOLSV$ODVND,QF3URGXFWLRQ0RQWK1RY)LHOG1DPH4DQQLN:HOO1XPEHU$SL1XPEHU&PS7\SH)LHOG&RGH,QM0HWKRG,QMHFWLRQ'D\V7EJ3UHVV0D[LPXP7EJ3UHVV$YHUDJH&6*3UHVV0D[LPXP&6*3UHVV$YHUDJH'DLO\/LTXLG'DLO\*DV7RWDO/LTXLG7RWDO*DV&'             &'             &'             6XP               (    (       !                       ! ! ! "! #  $ $     ! #  !     ! #  $%$ $     ! #  $%  $%     ! #%      ! #    ! &! #    ! &! #    ! #    ! #    ! #'       $&$$  $ ! $ $  (!            ( $&$  )!        $ ! !)  * +  ,-,./,0.1 ,2/304567.03784 69.4,1 0:,5; 92.,6            !"#$%&$'"%($#)!  0 * + + , ! - ,+.  .-   -  * -   ,  , * ,                                                                                                                CONOCOPHILLIPS ALASKA INCAlaska Oil And Gas Conservation CommissionMonthly Injection Report Form : 10-406Operator: ConocoPhillips Alaska Inc.Production Month: Nov - 2018Field Name: QannikWell NumberApi NumberCmp TypeField CodeInj MethodInjection DaysTbg Press MaximumTbg Press AverageCSG Press MaximumCSG Press AverageDaily LiquidDaily GasTotal LiquidTotal GasCD2-404 501032053000 4 120180 8 0 0 0 220 220 0 0 0 0CD2-466 501032057600 4 120180 6 30 1,585 1,441 910 523 957 0 28712 0CD2-467 501032057900 4 120180 6 30 1,627 1,457 1164 747 534 0 16031 0Sum: 44743 0             (    (       !                       ! ! ! "! #  $ $     ! #  !     ! #  $%$ $     ! #  $%  $%     ! #%      ! #    ! &! #    ! &! #    ! #    ! #    ! #'       $&$$  $ ! $ $  (!            ( $&$  )!        $ ! !)  * +  ,-,./,0.1 ,2/304567.03784 69.4,1 0:,5; 92.,6 Field Name Qannik Well Api Number Cmp Field Prod Prod Tbg Press Daily Daily Daily Total Total Number Type Code Method Days Average Oil Water Gas Total Oil Water Gas CD2-463 501032057700 1 120180 2 30 200 628 29 540 18854 861 16188 CD2-464 501032057400 1 120180 2 30 196 382 4 189 11459 128 5664 CD2-465 501032058300 1 120180 2 30 199 245 50 104 7337 1505 3127 CD2-468 501032058700 1 120180 2 30 200 453 92 327 13594 2749 9797 CD2-469 501032058000 1 120180 2 30 197 260 79 157 7809 2375 4706 CD2-470 501032058100 1 120180 2 30 201 148 34 70 4454 1023 2103 Sum: 63507 8641 41585 Page 8of8 Meld Name: Qannik Well Ap i Number Cmp Field Inj Injection Tbg Press Tbg Press CSG Press CSG Daily Daily Total Total Number Type Cade Method Days Maximum Average Maximum Press Liquid Gas Liquid Gas Average CD2-404 501032053000 4 120180 8 0 0 0 220 220 0 0 0 0 CD2-466 501032057600 4 120180 6 30 1,585 1,441 910 523 957 0 28712 0 CD2-467 501032057900 4 120180 6 30 1,627 1,457 1164 747 534 0 16031 0 Sum: 44743 0 Page 6 of 6 ConocaPhi[fips Nnnk'n, Inr., ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION AND INJECTION REPORT QANNIK PARTICIPATING AREA QANNIK (CD2) RECONCILIATION PRODUCTION MONTH Nov-18 TOTAL PIPELINE DELIVERIES FOR ALYESKA FROM ALPINE 2,074.718 LESS LOAD OIL _ LESS GREATER MOOSES TOOTH 264.185 ALPINE DELIVERIES (CD1, CO2. CD4, & COS) 1.103,275 FIORD-KUPARUK DELIVERIES (CD3) 9,788 FIORD-NECHEUK DELIVERIES (CD3) 176,807 NANUQ-KUPARUK DELIVERIES (CD4) 39B,669 NANUQ-NANUQ DELIVERIES (CD4) 47,861 OANNIK DELIVERIES (CD2) 63.507 DEVELOPMENT (CRt6; CD1-17) 7,952 DEVELOPMENT (OR17; CDi-04) 12.057 DEVELOPMENT (CR24) 617 DEVELOPMENT(CR25) _ DEVELOPMENT(CR28) _ EXPLORATORY _ NET PIPELINE DELIVERY PLUS LEASE USE CRUDE PLUS INJECTED SLP LESS NGLS TO PIPELINE 63,507 TOTAL NET ALLOCATED PRODUCTION QANNIK (CD2) 63,507 FORM 10-405 I f � YY C� ATy�� ING TATEME 5 ARE TRUE AND CORRECT TO THE BESTOF MY KNOWLEDGE. Revenue and Regulatory Analyst Diane Hendrickson Printed Name of Signer CONOCOPHILLIPS ALASKA INCAlaska Oil And Gas Conservation CommissionMonthly Production Report Form : 10-405Operator: ConocoPhillips Alaska Inc.Production Month: Dec - 2018Well NumberApi NumberCmp TypeField CodeProd MethodProd DaysTbg Press AverageDaily OilDaily Water Daily Gas Total Oil Total Water Total GasCD2-463501032057700 11201802 31 209 564 36 558 17497 1125 17310CD2-464501032057400 11201802 31 205 347 4 181 10767 130 5598CD2-465501032058300 11201802 31 208 217 46 89 6717 1417 2745CD2-468501032058700 11201802 31 208 415 81 335 12858 2500 10372CD2-469501032058000 11201802 31 206 243 72 137 7529 2226 4258CD2-470501032058100 11201802 31 215 141 32 55 4377 985 1695Sum: 59745 8383 41978Field Name Qannik CONOCOPHILLIPS ALASKA INCAlaska Oil And Gas Conservation CommissionMonthly Injection ReportOperator: ConocoPhillips Alaska Inc.Production Month: Dec - 2018 Form : 10-406Well NameApiInj Compl TypeField CodeInj MethodInjection DaysTbg Press MaximumTbg Press AverageCSG Press MaximumCSG Press AverageDaily LiquidDaily GasTotal LiquidTotal GasCD2-404501032053000 41201808 0 0 0 600 330 0 0 0 0CD2-466501032057600 41201806 31 1,577 1,509 826 555 1048 0 32480 0CD2-467501032057900 41201806 31 1,581 1,567 869 760 632 0 19602 0Sum: 52082 0Field Name: Qannik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ield Marne Qannik Well Cmp Field Prod Prod Tbg Press Daily Daily Daily Total Total Api Number Total Oil Number Type Code Method Days Average Oil Water Gas Water Gas CD2-463 501032057700 1 120180 2 31 209 569 36 559 17648 1116 17339 CD2-464 501032057400 1 120180 2 31 205 351 4 181 10867 130 5607 CD2-465 501032058300 1 120180 2 31 208 219 45 89 6780 1409 2746 CO2-468 501032058700 1 120180 2 31 208 419 80 335 12976 2486 10388 CD2-469 501032058000 1 120180 2 31 206 245 71 138 7599 2216 4267 CD2-470 501032058100 1 120180 2 31 215 143 32 55 4421 982 1695 Sum: 60291 8339 42042 Field Name: Qannik Well Cmp Field Inj Injection Tbg Press Tbg Press CSG Press Press Daily Daily Total Total Number Api Number Type Code Method Days Maximum Average Maximum Liquid Gas Liquid Gas Average CD2-404 501032053000 4 120180 8 0 0 0 600 330 0 0 0 0 CD2-466 501032057600 4 120180 6 31 1,577 1,509 826 555 1,048 0 32480 0 CD2-467 501032057900 4 120180 6 31 1,581 1,567 869 760 632 0 19602 0 Sum: 52082 0 Ganoc4Phil[i ps Atn»1:,a. liar. ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION AND INJECTION REPORT QANNIK PARTICIPATING AREA QANNIK (CD21 RECONCILIATION PRODUCTION MONTH Dec-18 TOTAL PIPELINE DELIVERIES FOR ALYESKA FROM ALPINE 2.105.469 LESS LOAD OIL 490 LESS GREATER MOOSES TOOTH 341.705 ALPINE DELIVERIES (001, CO2. CD4, & CD5) 1,098,536 FIORD-KUPARUK DELIVERIES (003) 5,611 FIORD-NECHEUK DELIVERIES (CD3) 158,913 NANUQ-KUPARUK DELIVERIES (004) 368,134 NANUQ-NANUQ DELIVERIES (C04) 43.495 QANNIK DELIVERIES (CD2) 60291 DEVELOPMENT (CRIB; CCI.17) 15.035 DEVELOPMENT (CR17; CD1-04) 12,711 DEVELOPMENT(CR24) 538 DEVELOPMENT(CR25) - DEVELOPMENT (CR28) - EXPLORATORY - NET PIPELINE DELIVERY PLUS LEASE USE CRUDE PLUS INJECTED SLP LESS NGL8 TO PIPELINE 60,291 TOTAL NET ALLOCATED PRODUCTION QANNIK (CO2) $0,291 FORM 10-405 1 HEREBY�C,/,�,RTIFY THAT THE EGOING ST TEMENT�,.A�R/AE T�R/U/E/ANO CORRECT TO THE BEST OF MY KNOWLEDGE "'.rie=,- �(� / Revenue and Regulatory Analyst Diane Hendrickson Printed Name of Signer