Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout198-151XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. ~/~" ~ / ~/ File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned by: Beverly Mildred Damtha Lowell Date.: [] TO RE-SCAN Notes: Re-Scanned by: Bevedy Mildred Daretha Nathan Lowell Date: Is/ ) STATE OF ALASKA ) ALASKA ulL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND ÇQG:' ~,~ ,.,\ ,:, 'co Zero Other 5. Date Comp., Susp., or Aband. 5/3/2005 6. Date Spudded 08/28/1998 7. Date T.D. Reached 09/01/1998 8. KB Elevation (ft): 74.57' 9. Plug Back Depth (MD+ TVD) 11580 + 9025 10. Total Depth (MD+ TVD) 11666 + 9023 11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/A MSL ""ni'"'5 'ì LUU 1b. Well Class: ., ,:H~.p$vè"lopriient '"" E1Expl:orátÒry o Stratigraphic ",0 Service 12. Permit to Drill Number 198-151 305-075 13. API Number 50- 029-21661-01-00 14. Well Name and Number: PBU G-26A 15. Field 1 Pool(s): Prudhoe Bay Field 1 Prudhoe Bay Pool 1a. Well Status: 0 Oil 0 Gas 0 Plugged H Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 21. Logs Run: MWD, GR, RES, NEU, DEN, ES lOLL, DT 1 BHC, CNL, LDL, GR, Caliper, SP, MRES, RFT CASING, LINER AND CEMENTING RECORD ""';:",'" ":""',1,,',, 'ii;", $~,Tn~,q",qf;~W,iHI'~I:)," ,,',$, ~lI",JN," '~, '~,'"Q, ""~p"~~"",:w,,,,, Q, ,, ,,',',"',H'~,'" '0,"1;;[;':1.""1 ' 'I, ';:'G~DE;'I':i ~;, "IO~":,; 'S0TlJibM'I:;, ',ltDl?~:', 'BOT'"rOM ,,'I;;",'iŠ;IZ~,¡'il: iI, Conductor Surface 110' Surface 110' 9 cu yds Concrete L-80 1 S-95 Surface 2689' Surface 2688' 17-1/2" 3258 cu ft PF 'E', 465 cu ft L-80 Surface 9658' Surface 8361' 12-1/4" 575 cu ft Class 'G' L-80 9382' 9690' 8151' 8385' 8-1/2" 403 cu ft Class 'G' L-80 9498' 11665' 8240' 9023' 6" 330 cu ft Class 'G' o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2583' SNL, 1974' WEL, SEC. 12, T11N, R13E, UM Top of Productive Horizon: 5102' SNL, 1130' EWL, SEC. 07, T11N, R14E, UM Total Depth: 284' SNL, 63' WEL, SEC. 13, T11N, R13E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 658253 y- 5969067 Zone- ASP4 TPI: x- 661410 y- 5966614 Zone- ASP4 Total Depth: x- 660226 y- 5966126 Zone- ASP4 18. Directional Survey 0 Yes 181 No 22. ',("ÅCI~G,: I, "~,'S!l',, ',",:"'," , ", :Z,E, ,1" ' 20" :""~,;~,f,';;.·Þ;~Ä."Þf.." Insulated 72# 47# 26# 12.6# 13-3/8" 9-518" 7" 4-1/2" 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): None MD TVD MD S~~NrŒD 'JUL 0 ? 2005 26. Date First Production: Not on Production Date of Test Hours Tested Ft Ft 16. Property Designation: ADL 028307 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) ",I;\Iy1PILJ~~: ,; , PULLED :24;:',/'" TUSlN<iRECORD DEPTH SET (MD) 9502' PACKER SET (MD) 9444' SIZE 3-1/2", 9.3#, L-80 TVD 2S.Aclb, FRACTU~E~CEIy1I;NT SQUEEZE, Erc: DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10100' Set Whipstock 10100' P&A wI 37.5 Bbls Class 'G' PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A Oll-Bsl PRODUCTION FOR TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + Oll-Bsl Press. 24-HoUR RATE GAs-McF W ATER-BSl CHOKE SIZE GAS-Oil RATIO GAs-McF WATER-Bsl Oil GRAVITY-API (CORR) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None Form 10-407 Revised 12/2003 RB[)~AS BFL JUL. 0 ;, 7005 CONTINUED ON REVERSE SIDE ¿F 28. ') 29. ) GEOLOGIC MARKERS FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag River 9685' 8382' None '1 ('\":' ,-' ¿UUJ Shublik 9735' 8419' Shublik "B' 9785' 8457' Shublik 'C' 9798' 8468' 8494' 8568' 8642' Top of Sadlerochit I Z4B Zone 4A 9828' 9909' Zone 3 9991' Zone 2C 10043' 8687' Zone 2B 10142' 8775' Zone 2A 10171' 8801' Zone 1 B 10359' 8954' Base of Sadlerochit 11013' 9044' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble /fÔ~. tl ~ ... Title Technical Assistant Date [)G:, ! -;J.;3/ Œ PBU G-26A 198-151 305-075 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Drilling Engineer: Sean McLaughlin, 564-4387 Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only ) ) Well: Field: API: Permit: G-26B Prudhoe Bay Unit 50-029-21661-02-00 205-048 Accep!:, Spud:" , Release: Rig: PRE-RIG WORK '10rJr ~þ L )'1 iJ 4:":} ,pq/1 0~p5 OSif2/d5 - 09/24/05 Nordic #1 04/14/05 CORRELATED TO SWS RESERVOIR SATURATION LOG DATED 17-JAN-2003. SET TOP OF WHIPSTOCK AT 10100'. TWO PIP TAGS AT 10107.35'. DO NOT SET DOWN MORE THEN 2K LBS UNTIL WHIPSTOCK HAS BEEN CEMENTED IN PLACE. 05/02105 KILL WELL WITH 1% KCL, RIH WI 2" BON. 05/03/05 RIH WI 2" BON, TAG TOP OF WHIPSTOCK AT 10103' CTD, CORRECT TO 10100' ELM. PUH TO 10095' FLAG PIPE. PUMP 37.5 BBLS 15.8# CLASS G CEMENT, SQUEEZE 13.5 BBLS BELOW WHIPSTOCK WITH 1000 PSI BUMP. LAY IN REMAINING CEMENT. TOTAL OF 16.5 BBLS CEMENT PAST WHIPSTOCK. FCO TO WHIPSTOCK WITH 1.5# BIOZAN AND SLlCKWATER HOLDING 500 PSI ON CHOKE,1:1 RETURNS. FREEZE PROTECT WELL TO 3000' WITH DIESEL. LOCK IN 500 PSI WHP ON TUBING. PIN HOLE IN CR16 COIL AT 1075'. 05/05/05 RIH WI 2.5" CENT AND S. BAILER. TAGGED CEMENT AT 10080' SLM. MIT-T TO 1000#. TAGGED CEMENT AT 10080' SLM. -') ') Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-26 G-26 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 BP EXPLORATION Operations Summary Repoft'\~i, " ~" ~ Ziì" nu·. , iJ-:- .J ,-) ,.?,I, v Page 1 .. ~': I , ! .,": ('I !:'" I Start: 5/1 ö/2bos Rig Release: 5/24/2005 Rig Number: 1 ~pyqD9-te: .lO/3111986 End: Date From - To Hours Task Code NPT Phase Description of Operations 5/1 0/2005 15:30 - 20:30 5.00 MOB P PRE Move rig to G-26B. Hold safety meeting prior to moving over well. Well dead. Prep Cellar. Move over well. 20:30 - 23:00 2.50 RIGU P PRE NO tree cap. NU BOPE Prep location. Prep rig flooor. Spot crane. ACCEPT RIG: 20:30 hrs 5/10/05 23:00 - 00:00 1.00 BOPSUP P PRE Test BOPE. - Grease tree and manifold. - Leaking door seal on 2" combi -- replaced. Pick 2-3/8" reel. Remove drive plates. 5/11/2005 00:00 - 06:00 6.00 BOPSUF P PRE Test BOPE. - Grease tree. Remove drive plates, install new. Pick 2" coil. Prep coil for use. 06:00 - 07:00 1.00 RIGU P PRE R/U hardline to inner reel valve. R/U horses head. 07:00 - 12:30 5.50 RIGU P PRE C/O injector head gripper blocks from 2-3/8" to 2". Stab CT stripper on well. R/U to stab CT. 12:30 - 12:45 0.25 RIGU P PRE Held PJSM & HAlHM for stabbing CT. 12:45 - 15:45 3.00 RIGU P PRE P/U injector head. C/O packoffs & M/U injector to stripper. Slip grapple into CT & pull test. Pull CT over pipe shed with winch & stab into injector. 15:45 - 16:45 1.00 RIGU P PRE GBR install SLB weld-on CTC. Pull test to 35k. Meanwhile fill pits with KCL-bio water. 16:45 - 17:00 0.25 RIGU P PRE M/U dart catcher. Pump 5bbls MeOH spacer. Close inner reel valve. P/test hardline to inner reel valve to 4500psi - OK. 17:00 - 18:00 1.00 RIGU P PRE Fill CT reel with bio-KCL water. Pressure up to 3000psi after 39bbls. Break dart catcher & observe debris & rock in CT. Excellent judgement by SLB Supervisor to flush CT reel 1 st before pumping dart to prevent stuck dart in CT (....awarded with a gift certificate). 18:00 - 19:30 1.50 RIGU P PRE Cut CT & re-install weld-on CTC. - Circulate coil, take 5 bbls MEOH to TT prior to welding operations. - Pull test and pressure test. 19:30 - 20:30 1.00 WHIP P WEXIT Load and launch dart. - 39 bbls. 20:30 - 21 :00 0.50 WHIP P WEXIT PU milling assembly. - 2.74 mills (pilot and string). 21 :00 - 23:00 2.00 WHIP P WEXIT RIH with milling assembly. - Take diesel FP to TT. 23:00 - 00:00 1.00 STWHIP P WEXIT Tag WS. Confirm pinch point at 10,105.4' MO at 1.4 bpm, 1900 psi free spin. Mill window maintaining motor work at no more than 400 psi and WOB betwee 1-3k Ibs. 5/12/2005 00:00 - 07:00 7.00 STWHIP P WEXIT Mill window maintaining motor work at no more than 400 psi and WOB betwee 1-3k Ibs. Time mill as per RP. - Suspect BOW at 10,110.6' MO, 5.2' window. - PU 26.5k -- SO 11k. - Free spin is 1900 psi. Printed: 5/31/2005 8:04:35 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ) ) Page 2 ~ BP EXPLORATION Operations Summary ReI)J~rt. G-26 G-26 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 f\ I; ~",' ':~\~ ~~Date: 10/31/1986 , '~:~~!;in~:':~'::~'~":: Start: 5/10/2005 Rig Release: 5/24/2005 Rig Number: 1 5/12/2005 00:00 . 07:00 From - To Hours Task Code NPT Phase Description of Operations Date 07:00 - 08:25 08:25 - 09:00 09:00·09:15 09:15 - 10:20 10:20 - 10:30 10:30 - 12:20 12:20 . 13:20 13:20 - 13:30 13:30 - 14:00 14:00 - 15:45 15:45 - 16:15 16: 15 - 16:45 16:45 - 17:00 17:00 - 18:30 18:30 - 19:15 19:15·20:00 20:00·22:15 22:15·22:30 22:30 . 00:00 5/13/2005 7.00 STWHIP P 1.42 STWHIP P 0.58 STWHIP P 0.25 DRILL P 1.08 DRILL P 0.17 DRILL P 1.83 DRILL P 1.00 DRILL P 0.17 DRILL P 0.50 DRILL P 1.75 DRILL P 0.50 DRILL N 0.50 DRILL N 0.25 DRILL N 1.50 DRILL N 0.75 DRILL N 0.75 DRILL N 2.25 DRILL N 0.25 1.50 DRILL P WEXIT Mill 10' of formation. - Geologist confirm sample. - Begin mud swap. WEXIT Paint EOP flag @ 9900' & POOH window milling BHA #1. WEXIT OOH. SIB injector. UD window milling BHA. DWM gauge 2.73" go/2.72" no go & DSR gauge 2.74" go/2.73" no go. PROD1 Held pre-spud safety/operations meeting. Reviewed well plan, potential hazards & drilling BHA M/U procedures. PROD1 M/U & lock tite drilling BHA #2 with a rebuild HCC DOSTRWD 2.7" x 3" bicenter bit, 1.1 deg BHI Xtreme motor, Sperry GR-DI R MWD, orienter & BKR MHA (OAL = 58.87'). Scribe tools. Mark orienter & M/U injector. PROD1 Function test orienter @ surface. Unstab injector & check orienter mark - got 1 for 1 clicks. M/U injector. PROD1 RIH drilling BHA #2. Correct -6' @ the flag. PROD1 Log down GR & tie-into formation marker @ 9823' - add 7' to CTD. PROD1 Continue RIH circ @ min rate. RIH dry clean thru window & tag TD @ 10117'. Bring on pumps. TF @ 35R. Freespin = 1.55bpm/3400psi. PVT = 328bbls. Up wt = 26.5k. Down wt = 14k. PROD1 Orient TF around to 25L. PROD1 Begin drilling build/turn section with 30L TF, 1.55/1.55bpm, 3400/3560psi, & 2k WOB. Drill to 10129' with occasional stalling. Observe MWD pulsing intermittently (off & on DFAL PROD1 POOH to check BHA. Observe MWD pulsing OK 500'. Decide to RBIH & reattempt to drill. DFAL PROD1 RIH to btm. DFAL PROD1 Troubleshoot MWD & observe Inter . ent pulses especially with motor stalls. Suspect the compensating piston seals may be locking up on the R er with increase in differential pressure. Will need to pulser. DFAL PROD1 POOH drilling BH . Paint EOP flag @ 9900'. DFAL PROD1 OOH. SIB inj or. Check motor - OK. Check bit - OK. C/O motor & D pulser. DFAL PROD1 M/U ock tite build section BHA #3 with same HC DOSTRWD x 3" bicenter bit, new 1.1 deg BHI Xtreme motor, Sperry GR-DIR MWD, orienter & BKR MHA. Scribe tools. PT CTC - OK. Function test orienter @ surface - OK. M/U injector. RIH drilling BHA #3. - SHT at 3300' MD. . Orient highside. RIH through window. PROD1 Tag and orient to 20 LOHS. PROD1 Drill ahead to 10,150' MD. . Free spin 3200 psi at 1.4 / 1.5 bpm. - Drilling at 3500 psi, 2-5k WOB. - ROP at 30 fpm PROD1 Tie in to GR and RA tag. - + 10.5' correction TOWS: 10,098.7' MD TOW: 10,100.8' MD BOW: 10,106.0' MD Printed: 5/31/2005 8:04:35 AM .@ ~. ir"".]. r;~ß.i ..\ .' :u.n.'. ? ¡...... :~ ,t i\.~~¡~. l! ~ 1.\ 'U'! I L, '\ '"'" , I 1" \ '~ ¡ i ; DW"i~ i i 'f' / I ,~ ¡! : ~i . i . . 1/ li'1 'II " '\ ¡ . flU ;~~I~\··! t\n ' ) '.'¡'ill' :1 r.,...i¡' Iii ¡!r' I ! i l' t.· . . " I ~ U ¡ j -; f1\'('-'" ¡: ! 1~1 :1 n '\ ; i ir'" \,,\'-" : I [': \ ~ ,." ,. .,' \ \.~ i l iJ-~ \ i¡:l ',~ )'ì ~:::J :~.. ~'u '~~: ) ~. FRANK H. MURKOWSKI, GOVERNOR A.I/A.~HA. OIL AIWD GAS CONSERVATION COMMISSION 333 W. pH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Sean McLaughlin CT Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay G-26A Sundry Number: 305-075 Dear Mr. McLaughlin: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a . ay or weekend. A person may not appeal a Commission decision to Superior urt unless rehearing has been requested. DATED this¡¿fday of March, 2005 Encl. :i..;;:(...;~ 't\.i. kiE"'"Y' Jj tIp í .; ?Q n;:-, UiJ:í"'tD'f1~~ J...v~. Jt -''i..£.. ,"0 1. Type of Request: /' II Abandon 0 Repair Well 0 Plug Perforations 0 Stimulate o Alter Casing 0 Pull Tubing 0 Perforate New Pool 0 Waiver o Change Approved Program 0 Operation Shutdown 0 Perforate 0 Re-Enter Suspended Well WG~ )ll~/2005 orS 3/25" /5 ) STATE OF ALASKA ) L¿. , '1 ALASKA OIL AND GAS CONSERVATION COMMISSION RECelVI!D APPLICATION FOR SUNDRY APPROVAL MAR 22 2005 20 AAC 25.280 . , · · Alaska Oil & Gas Conl~ CommaSSIOß Anchorege o Other o Time Extension 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Current Well Class: IBI Development 0 Exploratory o Stratigraphic 0 Service 5. Permit To Drill Number 198-151 /' 6. API Number: / / 50- 029-21661-01-00 99519-6612 74.57' 9. Well Name and Number: PBU G-26A / 10. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool PRESENT WELL CONDITION SUMMARY Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): 11580 9025 None MD TVD Burst 8. Property Designation: ADL 028307 11. Total Depth MD (ft): 11666 Casing Structural Conductor Surface Intermediate Production Liner Total Depth TVD (ft): 9023 Length Size Junk (measured): None Collapse Liner 110' 20" 110' 110' 2689' 13-3/8" 2689' 2688' 4930 2670 9658' 9-5/8" 9658' 8361' 6870 4760 308' 7" 9382' - 9690' 8151' - 8385' 7240 5410 2167' 4-1/2" 9498' - 11665' 8240' - 9023' 8430 7500 Perforation Depth MD (ft): Perforation Depth TVD (ft): 1 0341' - 11560' 8939' - 9025' Packers and SSSV Type: 7" x 3-1/2" Baker 'S-3' packer; 3-1/2" HES 'X' Nipple Tubing Size: 3-1/2",9.3# Tubing Grade: . L-80 Packers and SSSV MD (ft): 9444' 2194' Tubing MD (ft): 9502' 12. Attachments: IBI Description Summary of Proposal o Detailed Operations Program 14. Estimated Date for Commencing Operations: o BOP Sketch 13. Well Class after proposed work: ./ o Exploratory IBI Development 0 Service 16. Verbal Approval: Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Sean McLaughlin Title CT Drilling Engineer 5^" rJ ~ r-:.- April 15, 2005 Date: 15. Well Status after proposed work: DOil o Gas o WAG DGINJ o Plugged DWINJ IBI Abandoned o WDSPL Contact Sean McLaughlin, 564-4387 Signature Phone 564-4387 Commission Use Only Date ~ /2..2/05 Prepared By Name/Number: Terrie Hubble, 564-4628 Conditions of approval: Notify Commission so that a representative may witness I Sundry Number: 3c's-- 07Ç- o Plug Integrity o BOP Test o Mechanical Integrity Test o Location Clearance Other: Ay j) I\J J ê J F=o ý H' h vu: ¡J j L" ç,: clc {" C<.Li'- ~ 1/ C7 - 2 <;. B ' " COMMISSIONER RBDMS BFl MAR 2 9 2005 DateL~: APPROVED BY THE COMMISSION O r', ~ ,,""" r;~l'" i\ ¡') ¡ f\L. ) ) ~..~ ~ 1. .),',..., ~:J:J -. To: Winton Aubert Petroleum Engineer Alaska Oil & Gas Conservation Commission From: S.M. McLaughlin CTD Engineer Date: March 21, 2005 Re: P&A operations for well G-26A as part of the CTD sidetrack Well G-26A~' /" andidate for a through tubing sidetrack with the SLB/Nordic 1 Coiled Tubing Drilling rig. The......... sidetrack, G ", will exit the 4-1/2" liner off a whipstock and target Zone 1. The proposed kick off point is above the e íng perforations, which will be isolated by a cement plug. The following describes work planned for the P&A and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is ~ attached for reference. Pre CTD Summary 1) 0 MIT-OA 2) 0 MIT-IA 3) 0 AC-LDS/POT; AC-PPPOT -~; AC-PPPOT - T 4) E Set whipstock at 10100' (;~~ 5) C P&A parent well with 15.8 ppg cemen~71) The pre CTD work is slated to begin on 4/15/05. Sean McLaughlin CTD Drilling Engineer 564-4387 CC: Well File Sondra Stewmanrrerrie Hubble TREE = WELLHEAD = ÃCTûAfÓR;;; . ' . , , . ,. .,.." " . , , . . .., ' . " "'",. KB. ELEV = 'Bï=~ELEV; , KOP= Max Angle = .,...,................."..,..,..,.,.,,,...,,..,......,.. Datum MD = Datum TVD = 4-1/16" CrN FMC , ,,()!I? 74.57' 36,37' ... ...........,,,.. n.""""""".., 3200' 94 @ 11366' 10255' 8800' SS ) 13-3/8" CSG, 72#, L-80, ID= 12,347" 1-1 2691' Minimum ID = 2.750" @ 9431' 3-1/2" HES X NIPPLE I TOP OF 7" LNR 1-1 9-5/8" CSG, 47#, L-80, ID = 8.681" 1-1 I TOP OF 9-5/8" CSG 1-1 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 1-1 I TOP OF 7" LNR 1-1 I TOP OF 4-1/2" LNR 1-1 I 3-1/2" TBG, 9,3#, L-80, ,0087 bpf, ID = 2.992" 1-1 9-5/8" CSG, 47#, L-80, ID = 8,681" 1-1 I TOP OF WHIPSTOCK 1-1 3266' 4689' 4689' 9832' 9832' 9498' 9502' 9657' 9713' G-26A ~ : ,~ 1 ~ ~I 8 t ~ 1'---1. ~ ~ - L I ~ \~ nl . ; ~ I SA'} NOTES: 2194' 1-1 3-1/2" HES X NIP, ID = 2.750" 1 ~ ST MD TVD 4 3498 3487 3 5934 5491 2 7936 6985 1 9184 7998 GAS LIFT MANDRELS DEV TYPE VLV LATCH 18 MMG DMY RK 41 MMG DMY RK 37 MMG DMY RK 35 MMG DMY RK PORT DATE o 03/16/03 o 03/16/03 o 03/16/03 o 9431' 1-1 3-1/2" HES X NIP, ID = 2.750" 1 9444' 1-17" x 3-1/2" BAKER S-3 PROD A<R, ID = 3.875" 9469' 1-1 3-1/2" HES X NIP, ID = 2.750" 1 9490' 1-1 3-1/2" HES X NIP, ID = 2,750" 1 9502' 1-1 3-1/2" TUBING TAIL WLEG 1 9489' 1-1 ELMD TT LOGGED 11/29/98 9505' 1-1 7" x 4-1/2" ZXP LNR A<R & LNR HGR 7" LNR, 26#, L-80, ,0383 bpf, ID = 6,276" 1-1 10649' 1\ PERFORA TION SUMMARY REF LOG: SWS CNL ON 09/02/98 A NGLE AT TOP PERF: 48 @ 10342' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OPNISQZ DATE 2-1/2" 6 10342 - 10357 0 04/04/01 2-1/2" 6 10610-10640 0 11/28/98 2-1/2" 6 1 0740 - 10800 0 11/28/98 2-3/4" 4 10860 - 10980 0 09/09/98 2-3/4" 4 11080 - 11220 0 09/09/98 2-3/4" 4 11270 - 11390 0 09/09/98 2-3/4" 4 11510 - 11560 0 09/09/98 DATE 11/17/86 09/10/98 03/02/01 02/01/02 03/17/03 07/13/03 REV BY COMMENTS ORIGINAL COM PLETION SIDETRACK COM PLETION SIS-MD FINAL RNlTP CORRECTIONS JJ/TLH GL V C/O CMO/TLP MAX ANGLE CORRECTION 7" SIDETRACK WINDOW 9690' - 9719' I PBTD 1-1 11579' 1 4-1/2" LNR, 12,6#. L-80, ,0152 bpf, ID = 3.958" 1-1 11665' DATE REV BY COMMENTS PRUDHOE BA Y UNIT WELL: G-26A PERMIT No: 1981510 API No: 50-029-21661-01 SEC 12, T11 N, R13E. 2583' SNL & 1974' WEL BP Exploration (Alaska) Tì'tEE = WB..LHEAD = ACTUA TOR = KB. REV = BF. REV = KOP= Max Angle = Datum MD = DatumTVD= 4-1/16" crw FMC OTIS f' . 74.57' 36.37' 3200' 94 @ 11366' 10255' 8800' S5 ) 13-3/8" CSG, 72#, L-80, 10 = 12.347" 1-1 2691' Minimum ID = 2.750" @ 9431' 3-1/2" HES X NIPPLE I TOP OF 7" LNR 1-1 3266' 9-5/8" CSG, 47#, L-80, 10 = 8,681" 1-1 4689' I TOP OF 9-5/8" CSG 1-1 4689' 7" LNR, 26#, L-80. .0383 bpf. 10 = 6.276" 1-1 9832' I TOP OF 7" LNR 1-1 9832' I TOP OF 4-1/2" LNR 1-1 13-1/2" TBG, 9.3#, L-80, .0087 bpf. 10 = 2.992" I 9-5/8" CSG, 47#, L-80, 10 = 8.681" I TOP OF WHIPSTOCK 7" LNR, 26#, L-80, .0383 bpf. 10 = 6.276" 9498' ~ 9502' 9657' 9713' 10649' - 7" SIDETRACK WINDOW 9690' - 9719' ÆRFORA TION SUMrv1ARY REF LOG: SW5 CNL ON 09/02/98 ANGLEAT TOP ÆRF: 48 @ 10342' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OPN/SQZ DATE 2-1/2" 6 10342 - 10357 isolated proposed 2-1/2" 6 10610 - 10640 isolated proposed 2-1/2" 6 10740 - 10800 isolated proposed 2-3/4" 4 10860 - 10980 isolated proposed 2-3/4" 4 11 080 - 11220 isolated proposed 2-3/4" 4 11270 - 11390 isolated proposed 2-3/4" 4 11510 - 11560 isolated proposed I PBTD 1-1 11579' 4-1/2" LNR, 12.6#, L-80, .0152 bpf, 10 = 3,958" 1-1 11665' DATE 11/17186 09/10/98 03/02/01 02/01/02 03/17/03 07/13/03 REV BY COMMENTS ORIGINAL COM PLETION SIDETRACK COM PLETION SIS-MD FINAL RNffP CORRECTIONS JJITLH GL V C/O CMOITLP rv1AX ANGLE CORRECTION G-26B SAÆ )OTES: Proposed cro Sidetrack ~ - L I 8 I 8' t ~ 1-1 3-1/2" HES X NIP, ID = 2.750" 1 2194' ~ 5T MD TVD 4 3498 3487 3 5934 5491 2 7936 6985 1 9184 7998 GAS LIFT rv1ANDRELS DEV TYÆ VLV LATCH 18 MMG DMY RK 41 MMG DMY RK 37 MMG DMY RK 35 MMG DMY RK PORT DATE o 03/16/03 o 03/16/03 o 03/16/03 o 9431' 1-1 3-1/2" HES X NIP, ID = 2.750" 1 9444' 1-17" x 3-1/2" BAKER S-3 PROD PKR, 10 = 3.875" 9469' 1-1 3-1/2" HES X NIP, 10 = 2.750" 1 9490' 1-1 3-1/2" HES X NIP, ID = 2.750" 1 '~ 9502' 1-1 3-1/2" TUBING TAIL WLEG 1 !.. I 9489' 1-1 B..MD TT LOGGED 11/29/98 9505' 1-1 7" x 4-1/2" ZXP LNR PKR & LNR HGR ~ I ;fif ~ DATE REV BY ", COMMENTS 9900' - Top of 2-3/8" Liner 9900' - Top of Cement 2-3/8" cmt'ed and perfed I) 1-1 12350' c=::J--C:=::J I\I1echanical Whipstock 10100' ~ PRUDHOE BA Y UNIT WB..L: G-26A ÆRMIT No: 1981510 API No: 50-029-21661-01 SEe 12, T11N, R13E. 2583' SNL & 1974' WB.. BP Exploration (Alaska) MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Julie Heusser, Commissioner THRU' Tom Maunder, P. I. Supervisor FROM' Chuck Scheve; SUBJECT' Petroleum Inspector DATE: April 24, 2001 Safety Valve Tests Prudhoe Bay Unit G-Pad .Tu.esdav, April 24, 2001' I traveled to BPXs G Pad and witnessed the one-month retest of the safety valve systems. As the attached AOGCC Safety Valve System Test Report indicates ! witnessed the testing of 16 wells and 32 components with no failures. The surface safety valve on well G-03A closed rather slowly but passed its pressure test. The wing valve on wells G-16 and G-18A had very slow leaks but did not prohibit a valid test of the surface safety valve. Well G-21 which~failed the pre~ious rnonthstest~dueIo.~ frozen pilot, has the new style insulation box in place and functioned properly. Merv Liddelow performed the testing today; he demonstrated good test procedures and was a pleasure to work with. A walk through inspection of the well houses on this pad was performed during the SVS testing with no problems noted. Well G-t4A which was shut in at this time and not tested was found to have the new style insulation box on the pilot. This shOuld fix the problems found on previous tests. Summary' I witnessed the one-month retest of the safety valve systems at BPXs G-Pad. PBU G Pad, 16 wells, 32 components, 0 failures 22 wellhouse inspections Attachment: SVS PBU G Pad 4-24-01 CS X Unclassified Confidential (Unclassified if doc. removed ) Confidential SVS PBU G Pad 4-24-01 CS Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Chuck Scheve Submitted By: Chuck Scheve Field/Unit/Pad: Prudhoe / PBU / G Pad Separator psi: LPS 174 Date: 4/24/01 HPS 720 Well Permit Separ Set L/P Test Test Test Date oil, WAG, GIN& Number Number PSI PSI Tdp Code Code Code Passed GAS or CYCLE G-01A 1931710 720 550 530 P P P OIL G-02A 1950230 G-03A 1970700 174 125 100 P P P OIL G-04A 1951630 G-05 1780970 720 550 525 P P P OIL G-06 1790120 G-07 1790180 174 125 110 P P P OIL G208 1810480 G-09A 1982630 G-10A 1950390 · G-11A 1931600 720 550 540 P P P OIL G-12A 1961050 G-13 1810720 174 125 125 P P P OIL G-14A 1980530 G-15A 1981340 720 550 500 P P P OIL! G'16 1811220 720 550 500 P P P OIL G-17 1810940 G-18A 1990320 720 550 '550 P P P OIL G-19A 1991030 720 550 530' P P P OIL G-21 1951540 720 550 500 P P P OIL G-23A 1960200 720 5501 510 P P P OIL , G-24 18618301 G-25 18616201 720 550 510 P P P OIL , G-26A 1981510 720 550 500 P- P P OIL G-27 1861560 720 550 525 P P P OIL G-29 1861600 G-30A 1950760 G-31A 1980540 720 550 525 P P P OIL G-32A 1970010 r-~ 90 Day RJF 1/16/01 Page 1 of 2 SVS PBU G Pad 4-24-01 CS Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GINJ, Number Number PSI PSI Trip Code Code Code Passed CAS or CYCLE Wells: 16 Components: 32 Failures: 0 Failure Rate: 0.00% ~] 90 var Remarks: Good Test. Surface Safety Valve on Well G-03A closed slowly but passed its pressur test. The wing valve on wells G-16 and G-18A had very slow internal leaks and will repaired by the operator. RJF 1/16/01 Page 2 of 2 SVS PBU G Pad 4-24-01 CS -Weli Compliance Report File on Left side of folder 198-151-0 PRUDHOE BAY UNIT Roll #1: Start: Stop Roll #2: MD !_1666 TVD 09023 Completion Date: G-26A 50- 029-21661-01 Start Stop 9/10/98 Completed Status: 1-OIL BP EXPLORATION (ALASKA) lNG Current: Name D 8803 D 8839 L BHCS L NGP/DGR/EWR4-MD L NGP/DGR/EWR4-TVD L PEX-3DD/CN L PEX-CN L PEX-HALS L PEX-MCFL L PEX-SSTVD L RFT T 8964 1 Daily WellOps _ .- _ . Was the well cored? yes no Comments: Interval 2,3 SPERRY GR 2,3 SPERRY GR/EWR4 FINAL 9710-10965 FINAL 9720-11666 FINAL 9720-11666 FINAL 9710-11009 FINAL 9710-10994 FINAL 9710-11022 FINAL 9710-11022 FINAL 9710-11022 FINAL 9720-10956 SCHLUM PEX-HALS/BHC OH 12/9/98 12/8/98 OH 1/20/99 1/20/99 OH 1/19/99 1/21/99 OH 12/23/99 12/23/98 OH 12/23/99 12/23/98 OH 1/19/99 1/21/99 OH 1/19/99 1/21/99 OH 1/19/99 1/21/99 OH 1/19/99 1/21/99 OH 1/19/99 1/21/99 CH 5 9/23/98 9/24/98 OH 1/19/99 1/21/99 Sent Received T/C/D Are Dry Ditch Samples Required? yes~/ And Received? yes no Analysis Description Received? yes (~ Sample Set # Wednesday, November 08, 2000 Page 1 of 1 GeoQuest 3940 Arctic Blvd Anchorage, AK 99,503 ATI'N: Sherrie NO. 12246 Company Alaska Oil & Gas Cons Corem Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Open Hole) LIS Well Job # Log Description Date BL Sepia Tape G-26A '~ ~ (,~¢_~ 98646 PEX/BHC/HALS 980902 1 G-26A 98646 PE×-HALS 980902 1 1 G-26A 98646 PEX-MCFL 980902 ! 1 G-26A 98646 PEX-CNL 980902 1 1 G-26A 98646 PEX-3 DET.DEN.CNL 980902 1 1 G-26A 98646 BHC 980902 i 1 G-26A 98646 PEX-SSTVD 980902 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: 1/19/99 BP Exploration (Alaska)Inc. Petrotectnical Data Center MB3-3 900 E. Benson Bivd. RECEIVED Anchorage, Alaska 99519-6612 Date Delivered: JAN 21 1999 Alaska Oil & Gas Cons. Commission Schlumberger GeoQuest 3940 Arctic Blvd Anchorage, AK ATTN: Sherrie~ Received 0 !:11 I--I--I I~ G WELL LOG TRANSMITTAL To: State of Alaska January 20, 1999 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs G-26A ~-MW-80336 1 LDWG formatted Disc with verification listing. API#: 50-029-21661-01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE Al'FAC]tED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Ali Turker 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 RECEIVED Date: JAN 20 19~ A~aQB a Gas Cons. commisr~on BP Exploration (Alaska) Inc. Petro-teehnieal Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Si Note' This Data replaces all previous Digital Data for Well ( G-26A ). 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company ra I:i I L_I.. I IM G To: WELL LOG TRANSMITTAL State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Drive Anchorage, Alaska 99501 ~'"~- t ~-'~] MWD Formation Evaluation Logs G-26A, AK-MW-80336 December 23, 1998 G-26A: 2"x 5" MD Resistivity & Gamma Ray Logs: 50-029-21661-01 2" x 5" TVD Resistivity & Cramma Ray Logs: 50-029-21661-01 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATYACHED COPIES OF THE TRANSM1TrAL LETTER TO THE ATI'ENTION OF: Sperry-Sun Drilling Services Attn: Ali Turker 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 : : ,-..- .t'''t: ?.,.,a,, .,..~ : ~'~' -, BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. ~nchorage, Alaska 99519-6612 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company 0 ICt I I_1_ I IM [3 SEI:I~/I C m S WEI~I~ LOG TRANSM1TYAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs G-26A AK-MW-80336 December 9, 1998 1 LDWG formatted Disc with verification listing. API#: 50-029-21661-01 PLEASE ACKNOWLEDGE RECEIPt BY SIGNING AND RETURNING THE ATFACI~D COPH~S OF THE TRANSMITrAL LETTER TO THE ATFENTION OF: Sperry-Sun Drilling Services Attn: Ali Turker 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Sign 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company STATE OF ALASKA .. ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR REOOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 98-151 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21661-01 4. Location of well at surface ? .:- .~-~ '. ~: ,,~'.r:~ .: -~.-..'~, ....... 9. Unit or Lease Name 2583' SNL, 1974' WEb, SEC. 12, T11N, R13E, UM ...... ;,~:.,!'"¢;'; ¢¢~.~-~-~... , Prudhoe Bay Unit Atto,p, of productive interval ; ~;',i~,/ . ~ ~¢~i i/ 10. Well Number 5102 SNL, 1130' EWL, SEC. 07, T11N, R14E, uM C/ ~:t;: ~~~1'./ At total depth i ..... 11. Field and Pool 285' SNL, 63' WEb, SEC. 13, T11N, R~rE, UM L ........ '.~'~ Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. (,,4~ Pool KBE = 74.57'I ADb 0E890~ 2. '¢ 2. ~ >- 12. Date Spudded8/28/98 I 13' Date I'D' Reached I 14' Date C°mp" Susp" °r Aband'l 15' Water depth' if °fish°re I 16' N°' °f C°mpleti°ns9/1/98 9/10/98 N/A MSL One 17. Total Depth (MD+TVD)I18. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV set I21. Thickness of Permafrost 11666 9023 FTI 11580 9025 FTI ~]Yes [~No (Nipple) 2194' MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, RES, NEU, DEN, ES/Bbb, DT/BHC, CNL, LDL, GR, Caliper, SP, MRES, RFT 23. CASING, LINER AND CEMENTING RECORD CASING SE~-I-ING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO%I-OM SIZE CEMENTING RECORD AMOUNT PULLED 20" Insulated Conductor Surface 110' 9 cu yds Concrete 13-3/8" 72# L-80 / S-95 Surface 2689' 17-1/2" 3258 cuft PF 'E', 465 cu ft Permafrost 9-5/8" 47# L-80 Surface 9658' 12-1/4" 575 cu ft Class 'G' 7" 26# L-80 9382' 9690' 8-1/2" 403 cu ft Class 'G' 4-1/2" 12.6# L-80 9498' 11665' 6" 330 cu ft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-3/4" Gun Diameter, 4 spf 3-1/2", 9.3#, L-80 9502' 9444' MD TVD MD TVD 10860' - 10980' 9046' - 9044' 11080' - 11220' 9043' - 9038' 26. ACID, FRACTURE, CEMENT SQUEEZE, FTC. 11270' - 11390' 9037' - 9033' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11510' - 11560' 9028' - 9025' Freeze Protect with 150 Bbls of Diesel 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) September 17, 1998I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBb GAS-MCF WATER-BBb CHOKE SIZE I GAs-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBb GAS-MCF WATER-BBb OIL GRAWTY-API (CORR) Press. 24-HOUR RATE 28. CORE DATA porosity, fractures, apparent~il~ ar~6j~pl~e¢~) ~. gas or core Brief description of lithology, ~ . .. · . ,r~, ~ oil, water. Submit chips. . , , I ;' ~ .:.~-;~ ~, ~..~ ~ ~ Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Sag River 9685' 8382' Shublik 9735' 8419' Shublik "B' 9785' 8457' Shublik 'C' 9798' 8468' Top of Sadlerochit / Z4B 9828' 8494' Zone 4A 9909' 8568' Zone 3 9991' 8642' Zone 2C 10043' 8687' Zone 2B 10142' 8775' Zone 2A 10171' 8801' Zone 1 B 10359' 8954' Base of Sadlerochit 11013' 9044' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 132. I hereby certifyft,~at the foregoin~q is true and correct to the best of my knowledge Signed''" Oames'~"~m~ ~~- Title Senior Drilling Engineer Date G-26A 98-151 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. iNSTRUCTIONS GEUERA': This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28.' If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility Date/Time 13 Aug 98 14 Aug 98 15 Aug 98 16 Aug 98 17 Aug 98 PB G Pad 09:00-06:00 06:00-06:30 06:30-16:30 16:30-01:30 01:30-02:00 02:00-03:15 03:15-03:30 03:30-06:00 06:00-06:15 06:15-06:45 06:45-07:00 07:00-07:15 07:15-08:15 08:15-11:00 11:00-11:30 11:30-12:30 12:30-13:00 13:00-14:00 14:00-15:00 15:00-16:00 16:00-16:30 16:30-16:45 16:45-17:00 17:00-17:15 17:15-17:30 17:30-18:00 18:00-19:30 19:30-20:00 20:00-21:00 21:00-21:15 21:15-22:00 22:00-22:45 22:45-04:00 04:00-04:15 04:15-05:00 05:00-05:15 05:15-06:00 06:00-06:30 06:30-14:30 14:30-15:00 15:00-16:00 16:00-18:00 18:00-23:15 23:15-00:45 00:45-01:15 01:15-04:15 04:15-05:00 05:00-06:00 06:00-06:45 06:45-07:00 07:00-09:45 09:45-10:15 10:15-12:15 12:15-12:30 Duration 21hr 1/2 hr 10hr 9hr 1/2 hr 1-1/4 hr 1/4 hr 2-1/2 hr 1/4 hr 1/2 hr 1/4 hr 1/4 hr 1 hr 2-3/4 hr 1/2 hr 1 hr 1/2 hr 1 hr lhr lhr 1/2 hr 1/4 hr 1/4 hr 1/4 hr 1/4 hr 1/2 hr 1-1/2 hr 1/2 hr 1 hr 1/4 hr 3/4 hr 3/4 hr 5-1/4 hr 1/4hr 3/4 hr 1/4 hr 3/4 hr 1/2 hr 8 hr 1/2 hr 1 hr 2 hr 5-1/4 hr 1-1/2 hr 1/2 hr 3 hr 3/4 hr 1 hr 3/4 hr 1/4 hr 2-3/4 hr 1/2 hr 2 hr 1/4 hr Progress Report Well G-26A Page Rig (null) Date Activity Rig moved 90.00 % Rig moved 90.00 % (cont...) Rig moved 100.00 % Rigged up Drillfloor / Derrick Rigged up Chicksan lines Retrieved Hanger plug Held safety meeting Circulated at 10006.0 ft Rigged down Chicksan lines Installed Hanger plug Tested Hanger plug Held safety meeting Removed Xmas tree Installed BOP stack Tested Blind ram Retrieved Hanger plug Rigged up Drillstring handling equipment Retrieved Tubing hanger Rigged up Completion string handling equipment Laid down 175.0 ft of Tubing Rigged up Drillstring handling equipment Singled in drill pipe to 50.0 ft Set packer at 50.0 ft with 0.0 psi Pulled out of hole to 0.0 ft Tested Retrievable packer - Via annulus Retrieved Seal assembly Removed Tubing head spool Installed Seal assembly Installed Tubing head spool Tested Seal assembly Installed BOP stack Rigged up Kelly Tested BOP stack Ran Drillpipe to 50.0 ft (3-1/2in OD) Retrieved Retrievable packer Pulled out of hole to 0.0 ft Rigged down Drillstring handling equipment Serviced Drillfloor / Derrick Laid down 9278.0 ft of Tubing Installed Wear bushing Repaired Draw works Made up BHA no. 1 Singled in drill pipe to 9278.0 ft Fished at 9278.0 ft Circulated at 9278.0 ft Pulled out of hole to 7.0 ft Pulled BHA Made up BHA no. 2 Made up BHA no. 2 (cont...) Held safety meeting R.I.H. to 9278.0 ft Fished at 9268.0 ft Circulated at 9300.0 ft Flow check 1 23 September 98 Facility Date/Time 18 Aug 98 19 Aug 98 20 Aug 98 21 Aug 98 Progress Report PB G Pad Well G-26A Rig (null) Page 2 Date 23 September 98 12:30-15:30 15:30-17:00 17:00-17:30 17:30-19:30 19:30-20:30 20:30-21:15 21:15-22:45 22:45-01:45 01:45-02:15 02:15-02:45 02:45-06:00 06:00-06:15 06:15-06:30 Duration 3 hr 1-1/2 hr 1/2 hr 2hr 1 hr 3/4 hr 1-1/2 hr 3 hr 1/2 hr 1/2 hr 3-1/4 hr 1/4 hr 1/4 hr Activity Pulled out of hole to 850.0 ft Pulled BHA Made up BHA no. 3 R.I.H. to 6550.0 ft Serviced Block line R.I.H. to 9300.0 ft Fished at 9304.0 ft Pulled out of hole to 850.0 ft Pulled BHA Made up BHA no. 4 R.I.H. to 9300.0 ft Circulated at 9315.0 ft Flow check 06:30-08:30 08:30-09:00 09:00-09:30 09:30-12:00 12:00-13:15 13:15-13:30 13:30-15:30 15:30-16:00 16:00-18:00 18:00-20:00 20:00-21:00 21:00-21:30 21:30-22:00 22:00-03:15 03:15-04:30 04:30-04:45 04:45-06:00 06:00-07:30 07:30-08:30 08:30-09:00 09:00-10:45 10:45-11:00 11:00-12:30 12:30-13:45 13:45-14:45 14:45-15:30 15:30-18:00 18:00-18:15 18:15-21:00 21:00-21:15 21:15-21:45 21:45-01:00 01:00-05:00 05:00-06:00 06:00-08:30 08:30-09:00 09:00-10:00 10:00-13:00 13:00-14:00 14:00-00:00 00:00-01:30 2 hr 1/2 hr 1/2 hr 2-1/2 hr 1-1/4 hr 1/4 hr 2 hr 1/2 hr 2 hr 2hr lhr 1/2 hr 1/2 hr 5-1/4 hr 1-1/4 hr 1/4 hr 1-1/4 hr 1-1/2 hr 1 hr 1/2 hr 1-3/4 hr 1/4 hr 1-1/2 hr 1-1/4 hr 1 hr 3/4 hr 2-1/2 hr 1/4 hr 2-3/4 hr 1/4 hr 1/2 hr 3-1/4 hr 4 hr 1 hr 2-1/2 hr 1/2 hr lhr 3 hr lhr 10hr 1-1/2 hr Pulled out of hole to 825.0 ft Pulled BHA Made up BHA no. 5 R.I.H. to 9300.0 ft Fished at 9304.0 ft Flow check Pulled out of hole to 815.0 ft Pulled BHA Made up BHA no. 6 R.I.H. to 6500.0 ft Serviced Block line R.I.H. to 9300.0 ft Circulated at 9304.0 ft Milled Retrievable packer at 9304.0 ft Circulated at 9311.0 ft Flow check Pulled out of hole to 4000.0 ft Pulled out of hole to 1830.0 ft (cont...) Pulled BHA Made up BHA no. 7 R.I.H. to 3274.0 ft Worked toolstring at 3274.0 ft R.I.H. to 9300.0 ft Fished at 9311.0 ft Fished at 9311.0 ft Pulled out of hole to 8400.0 ft Repaired Draw works Serviced Drillfloor / Derrick Pulled out of hole to 850.0 ft Pulled BHA Made up BHA no. 8 R.I.H. to 9300.0 ft Milled Retrievable packer at 9311.0 ft Pulled out of hole to 4000.0 ft Pulled out of hole to 150.0 ft (cont...) Pulled BHA Made up BHA no. 9 ~.v R.I.H. to 9238.0 ft Serviced Block line , Milled Permanent packer at9312.0ft ;~'~" (i~'.~!~ ~:~"~'~- Circulated at 9312.0 ft . Facility Date/Time 22 Aug 98 23 Aug 98 24 Aug 98 25 Aug 98 Progress Report PB G Pad Well G-26A Page 3 Rig (null) Date 23 September 98 01:30-04:30 04:30-05:00 05:00-05:30 05:30-06:00 06:00-09:00 09:00-09:45 09:45-12:00 12:00-13:00 13:00-14:00 14:00-22:00 22:00-22:30 22:30-02:00 02:00-06:00 06:00-16:30 16:30-18:30 18:30-18:45 18:45-21:30 21:30-22:30 22:30-23:00 23:00-02:30 02:30-03:00 03:00-04:00 04:00-06:00 06:00-07:00 07:00-08:30 08:30-10:30 10:30-10:45 10:45-11:00 11:00-13:15 13:15-13:45 13:45-14:30 14:30-16:00 16:00-19:00 19:00-19:30 19:30-22:00 22:00-00:00 00:00-00:30 00:30-01:00 01:00-04:00 04:00-05:30 05:30-06:00 06:00-06:15 06:15-07:30 07:30-09:00 09:00-10:30 10:30-16:00 16:00-16:15 16:15-16:30 16:30-19:00 19:00-20:30 20:30-21:00 21:00-22:00 22:00-01:00 01:00-01:30 Duration 3 hr 1/2 hr 1/2 hr 1/2 hr 3 hr 3/4 hr 2-1/4 hr lhr 1 hr 8 hr 1/2 hr 3-1/2 hr 4 hr 10-1/2 hr 2 hr 1/4 hr 2-3/4 hr 1 hr 1/2 hr 3-1/2 hr 1/2 hr 1 hr 2 hr 1 hr 1-1/2 hr 2 hr 1/4 hr 1/4 hr 2-1/4 hr 1/2 hr 3/4 hr 1-1/2 hr 3hr 1/2 hr 2-1/2 hr 2 hr 1/2 hr 1/2 hr 3 hr 1-1/2 hr 1/2 hr 1/4 hr 1-1/4 hr 1-1/2 hr 1-1/2 hr 5-1/2 hr 1/4 hr 1/4 hr 2-1/2 hr 1-1/2 hr 1/2 hr 1 hr 3 hr 1/2 hr Activity Pulled out of hole to 1308.0 ft Pulled BHA Made up BHA no. 10 R.I.H. to 3000.0 ft R.I.H. to 9300.0 ft (cont...) Fished at 9312.0 ft Pulled out of hole to 850.0 ft Pulled BHA Test Slickline unit unit Conducted slickline operations on Slickline equipment - Retrival run Made up BHA no. 11 R.I.H. to 9300.0 ft Milled Tubing at 9312.0 ft Milled Tubing at 9319.0 ft (cont...) Circulated at 9319.0 ft Flow check Pulled out of hole to 855.0 ft Pulled BHA Installed Hanger plug Tested BOP stack Installed Wear bushing Made up BHA no. 12 R.I.H. to 6000.0 ft R.I.H. to 9304.0 ft (cont...) Fished at 9319.0 ft Conducted electric cable operations Fished at 9319.0 ft Flow check Pulled out of hole to 855.0 ft Pulled BHA Serviced Block line Made up BHA no. 13 R.I.H. to 9319.0 ft R.I.H. to 9946.0 ft Pulled out of hole to 639.0 ft Pulled BHA Rigged down Handling equipment Made up BHA no. 13 R.I.H. to 9300.0 ft Circulated at 9319.0 ft Fished at 9319.0 ft Held safety meeting Rigged up Logging/braided cable equipment Conducted electric cable operations Pulled out of hole to %s Fished at 9312.0 ft Rigged down Logging/braided cable equipment Flow check Pulled out of hole to 852.0 ft Pulled BHA Serviced Drillfloor / Derrick Made up BHA no. 14 R.I.H. to 9312.0 ft Fished at 9312.0 ft Facility Date/Time 26 Aug 98 27 Aug 98 28 Aug 98 29 Aug 98 30 Aug 98 PB G Pad Progress Report Well G-26A Rig (null) Duration Activity 01:30-02:00 02:00-04:00 04:00-06:00 06:00-07:30 07:30-08:45 08:45-11:00 11:00-17:30 17:30-17:45 17:45-21:00 21:00-22:00 22:00-01:00 01:00-02:00 02:00-02:30 02:30-03:30 03:30-04:00 04:00-05:00 05:00-06:00 06:00-07:00 07:00-08:30 08:30-08:45 08:45-09:00 09:00-10:00 10:00-10:15 10:15-12:45 12:45-13:30 13:30-14:45 14:45-15:00 15:00-17:30 17:30-17:45 17:45-18:15 18:15-18:30 18:30-21:00 21:00-03:30 03:30-05:15 05:15-06:00 06:00-13:30 13:30-15:00 15:00-17:45 17:45-19:00 19:00-20:30 20:30-00:00 00:00-00:30 00:30-06:00 06:00-06:00 06:00-05:00 05:00-05:30 05:30-05:45 05:45-06:00 06:00-09:30 09:30-10:30 10:30-10:45 10:45-11:00 11:00-14:15 14:15-14:30 1/2 hr 2 hr 2 hr 1-1/2 hr 1-1/4 hr 2-1/4 hr 6-1/2 hr 1/4 hr 3-1/4 hr lhr 3 hr 1 hr 1/2 hr 1 hr 1/2 hr 1 hr 1 hr 1 hr 1-1/2 hr 1/4hr 1/4 hr 1 hr 1/4 hr 2-1/2 hr 3/4 hr 1-1/4 hr 1/4 hr 2-1/2 hr 1/4 hr 1/2 hr 1/4 hr 2-1/2 hr 6-1/2 hr 1-3/4 hr 3/4 hr 7-1/2 hr 1-1/2 hr 2-3/4 hr 1-1/4 hr 1-1/2 hr 3-1/2 hr 1/2 hr 5-1/2 hr 24 hr 23 hr 1/2 hr 1/4 hr 1/4 hr 3-1/2 hr 1 hr 1/4 hr 1/4 hr 3-1/4 hr 1/4 hr Rigged up Logging/braided cable equipment Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Fished at 9319.0 ft Conducted electric cable operations Fished at 9819.0 ft Flow check Pulled out of hole to 859.0 ft Pulled out of hole to 0.0 ft Laid down fish Tested Pipe ram Installed Wear bushing Made up BHA no. 15 R.I.H. to 3210.0 ft Serviced Block line R.I.H. to 6000.0 ft R.I.H. to 9723.0 ft (cont...) Circulated at 9757.0 ft Flow check Pulled out of hole to 9300.0 ft Circulated at 9757.0 ft Flow check Pulled out of hole to 860.0 ft Pulled BHA Rigged up Logging/braided cable equipment Held safety meeting Conducted electric cable operations Rigged down Logging/braided cable equipment Tested High pressure lines Held safety meeting Made up BHA no. 16 R.I.H. to 9700.0 ft Circulated at 9713.0 ft Milled Casing cutter at 9690.0 ft Milled Casing cutter at 9719.0 ft (cont...) Circulated at 9719.0 ft Pulled out of hole to 910.0 ft Pulled BHA Made up BHA no. 17 R.I.H. to 9719.0 ft Reamed to 9719.0 ft Drilled to 9776.0 ft Drilled to 10040.0 ft (cont...) Drilled to 10700.0 ft (cont...) Circulated at 10700.0 ft Flow check Pulled out of hole to 11700.0 ft Pulled out of hole to 731.0 ft (cont...) Pulled BHA Retrieved Wear bushing Installed Hanger plug Tested BOP stack Retrieved Hanger plug Page Date 4 23 September 98 :. ii i Progress Report Facility PB G Pad Well G-26A Page 5 Rig (null) Date 23 September 98 Date/Time 31 Aug 98 01 Sep 98 02 Sep 98 03 Sep 98 04 Sep 98 14:30-14:45 14:45-18:00 18:00-21:00 21:00-22:00 22:00-22:30 22:30-23:00 23:00-01:30 01:30-06:00 06:00-06:00 06:00-17:00 17:00-19:45 19:45-20:00 20:00-00:45 00:45-01:00 01:00-01:15 01:15-02:00 02:00-04:30 04:30-04:45 04:45-06:00 06:00-09:30 09:30-10:45 10:45-11:30 11:30-11:45 11:45-13:00 13:00-18:30 18:30-18:45 18:45-20:15 20:15-20:45 20:45-02:00 02:00-03:00 03:00-06:00 06:00-08:00 08:00-08:15 08:15-09:00 09:00-10:00 10:00-14:45 14:45-15:45 15:45-17:00 17:00-18:00 18:00-19:00 19:00-20:00 20:00-20:30 20:30-20:45 20:45-00:00 00:00-00:30 00:30-01:00 O1:00-02:30 02:30-03:30 03:30-06:00 06:00-07:30 07:30-08:00 08:00-08:30 Duration 1/4 hr 3-1/4 hr 3 hr 1 hr 1/2 hr 1/2 hr 2-1/2 hr 4-1/2 hr 24 hr llhr 2-3/4 hr 1/4 hr 4-3/4 hr 1/4 hr 1/4 hr 3/4 hr 2-1/2 hr 1/4 hr 1-1/4 hr 3-1/2 hr 1-1/4 hr 3/4 hr 1/4 hr 1-1/4 hr 5-1/2 hr 1/4 hr 1-1/2 hr 1/2 hr 5-1/4 hr 1 hr 3hr 2 hr 1/4 hr 3/4 hr lhr 4-3/4 hr 1 hr 1-1/4 hr 1 hr 1 hr 1 hr 1/2 hr 1/4hr 3-1/4 hr 1/2 hr 1/2 hr 1-1/2 hr 1 hr 2-1/2 hr 1-1/2 hr 1/2 hr 1/2 hr Activity Installed Wear bushing Made up BHA no. 18 R.I.H. to 9630.0 ft Serviced Block line R.I.H. to 10150.0 ft Took MWD survey at 10150.0 ft Logged hole with LWD: Formation evaluation (FE) from 10489.0 fl to 10700.0 ft Drilled to 10786.0 ft Drilled to 11358.0 fl (cont...) Drilled to 11666.0 ft (cont...) Circulated at 11666.0 ft Flow check Logged hole with LWD: Formation evaluation (FE) from 11666.0 fl to 10487.0 ft Pulled out of hole to 9600.0 ft Flow check R.I.H. to 11666.0 ft Circulated at 11666.0 ft Flow check Pulled out of hole to 9000.0 ft Pulled out of hole to 90.0 ft (cont...) Downloaded MWD tool Pulled BHA Held safety meeting Rigged up sub-surface equipment - Formation logs R.I.H. to 9544.0 ft Held safety meeting Functioned Other sub-surface equipment Conducted electric cable operations Conducted electric cable operations Retrieved Formation logs Pulled out of hole to 2000.0 ft Pulled out of hole to 0.0 fl (cont...) Held safety meeting Rigged down sub-surface equipment - Formation logs Installed Formation logs R.I.H. to 9544.0 ft Functioned Other sub-surface equipment Retrieved Formation logs Serviced Formation logs Conducted electric cable operations Retrieved Formation logs Rigged down sub-surface equipment - Other sub-surface equipment Flow check Pulled out of hole to 0.0 fl Rigged down sub-surface equipment - Formation logs Made up BHA no. 19 R.I.H. to 3250.0 ft Serviced Block line R.I.H. to 10961.0 ft Circulated at 10961.0 ft Reamed to 11961.0 ft R.I.H. to 11666.0 fl Facility Date/Time 05 Sep 98 06 Sep 98 07 Sep 98 Progress Report PB G Pad Well G-26A Rig (null) Page 6 Date 23 September 98 08:30-11:30 11:30-11:45 11:45-15:30 15:30-15:45 15:45-16:00 16:00-17:00 17:00-21:00 21:00-21:30 21:30-23:15 23:15-04:30 04:30-05:00 05:00-06:00 06:00-06:15 06:15-09:00 09:00-09:30 09:30-10:15 10:15-10:45 10:45-11:00 11:00-11:15 11:15-11:30 11:30-16:00 16:00-17:30 17:30-18:00 18:00-05:00 05:00-06:00 06:00-07:00 07:00-08:15 08:15-11:00 11:00-11:30 11:30-11:45 11:45-12:15 12:15-15:30 15:30-15:45 15:45-16:00 16:00-19:30 19:30-20:30 20:30-21:15 21:15-01:00 01:00-01:15 01:15-06:00 06:00-06:45 06:45-07:15 07:15-07:30 07:30-10:30 10:30-11:00 11:00-11:15 11:15-14:30 14:30-14:45 14:45-15:00 15:00-19:30 19:30-20:45 20:45-21:45 21:45-22:00 22:00-00:45 Duration 3 hr 1/4 hr 3-3/4 hr 1/4 hr 1/4 hr 1 hr 4 hr 1/2 hr 1-3/4 hr 5-1/4 hr 1/2 hr 1 hr 1/4 hr 2-3/4 hr 1/2 hr 3/4 hr 1/2 hr 1/4 hr 1/4 hr 1/4 hr 4-1/2 hr 1-1/2 hr 1/2 hr llhr 1 hr 1 hr 1-1/4 hr 2-3/4 hr 1/2 hr 1/4 hr 1/2 hr 3-1/4 hr 1/4 hr 1/4 hr 3-1/2 hr 1 hr 3/4 hr 3-3/4 hr 1/4 hr 4-3/4 hr 3/4 hr 1/2 hr 1/4 hr 3hr 1/2 hr 1/4 hr 3-1/4 hr 1/4hr 1/4 hr 4-1/2 hr 1-1/4 hr 1 hr 1/4 hr 2-3/4 hr Activity Circulated at 11666.0 ft Flow check Pulled out of hole to 90.0 ft Pulled BHA Held safety meeting Installed Formation logs R.I.H. to 9460.0 ft Circulated at 9460.0 ft Functioned Other sub-surface equipment Conducted electric cable operations Pulled out of hole to 9460.0 ft Retrieved Other sub-surface equipment Retrieved Other sub-surface equipment (cont...) Pulled out of hole to 0.0 ft Rigged down sub-surface equipment - Formation logs Serviced Formation logs Installed Formation logs R.I.H. to 290.0 ft Pulled out of hole to 0.0 ft Installed Formation logs R.I.H. to 9450.0 ft Functioned Other sub-surface equipment R.I.H. to 10116.0 ft Conducted electric cable operations Pulled out of hole to 9450.0 ft Pulled out of hole to 9450.0 ft Retrieved Other sub-surface equipment Pulled out of hole to 0.0 ft Rigged down sub-surface equipment - Formation logs Held safety meeting Retrieved Wear bushing Tested BOP stack Installed Wear bushing Made up BHA no. 20 R.I.H. to 9640.0 ft Serviced Block line R.I.H. to 11666.0 ft Circulated at 11666.0 ft Flow check Pulled out of hole to 200.0 ft Pulled BHA Rigged up Casing handling equipment Held safety meeting Ran Liner to 2142.0 ft (4-1/2in OD) Rigged up Tubing handling equipment Held safety meeting Ran Tubing to 2046.0 ft (2-7/8in OD) Installed Liner hanger Rigged up Drillstring handling equipment Ran Drillpipe in stands to 9620.0 ft Circulated at 9620.0 ft Ran Drillpipe in stands to 11666.0 ft Installed Cement head Circulated at 11666.0 ft Facility Date/Time 08 Sep 98 09 Sep 98 10 Sep 98 Progress Report PB G Pad Well G-26A Rig (null) Page 7 Date 23 September 98 00:45-01:00 01:00-01:15 01:15-01:30 01:30-01:45 01:45-02:00 02:00-02:30 02:30-04:00 04:00-04:30 04:30-06:00 06:00-07:00 07:00-08:15 08:15-08:45 08:45-09:00 09:00-09:30 09:30-10:00 10:00-10:15 10:15-10:30 10:30-10:45 10:45-11:30 11:30-12:30 12:30-13:15 13:15-17:30 17:30-18:00 18:00-18:15 18:15-18:30 18:30-19:00 19:00-19:30 19:30-19:45 19:45-00:30 00:30-01:00 01:00-01:30 01:30-02:30 02:30-02:45 02:45-05:00 05:00-05:45 05:45-06:00 06:00-06:45 06:45-16:30 16:30-19:00 19:00-20:00 20:00-20:30 20:30-22:00 22:00-22:15 22:15-22:30 22:30-23:15 23:15-00:00 00:00-00:15 00:15-00:30 00:30-01:30 01:30-03:00 03:00-03:30 03:30-04:00 04:00-05:30 05:30-06:00 Duration 1/4 hr 1/4 hr 1/4 hr 1/4 hr 1/4 hr 1/2 hr 1-1/2 hr 1/2 hr 1-1/2 hr 1 hr 1-1/4 hr 1/2 hr 1/4 hr 1/2 hr 1/2 hr 1/4 hr 1/4 hr 1/4 hr 3/4 hr 1 hr 3/4 hr 4-1/4 hr 1/2 hr 1/4 hr 1/4 hr 1/2 hr 1/2 hr 1/4 hr 4-3/4 hr 1/2 hr 1/2 hr 1 hr 1/4 hr 2-1/4 hr 3/4 hr 1/4 hr 3/4 hr 9-3/4 hr 2-1/2 hr 1 hr 1/2 hr 1-1/2 hr 1/4 hr 1/4 hr 3/4 hr 3/4 hr 1/4 hr 1/4 hr 1 hr 1-1/2 hr 1/2 hr 1/2 hr 1-1/2 hr 1/2 hr Activity Held safety meeting Tested Chicksan lines Pumped Water based mud spacers - volume 70.000 bbl Mixed and pumped slurry - 59.000 bbl Displaced slurry - 79.000 bbl Functioned Liner hanger Circulated at 11566.0 ft Rigged down Cement pump Pulled Drillpipe in stands to 7000.0 ft Tested Tie back packer - Via annulus and string Pulled Drillpipe in stands to 2046.0 ft Retrieved Setting tools Rigged up Tubing handling equipment Pulled Tubing in stands to 556.0 ft Laid down 556.0 ft of Tubing Retrieved Wear bushing Rigged up Drillfloor / Derrick Held safety meeting Installed Gun assembly Ran Tubing in stands to 2187.0 ft Installed Retrievable packer Ran Drillpipe in stands to 11561.0 ft Functioned Retrievable packer Held safety meeting Perforated Reverse circulated at 9348.0 ft Functioned Retrievable packer Flow check Laid down 9350.0 ft of 3-1/2in OD drill pipe Retrieved Retrievable packer Rigged up Tubing handling equipment Laid down 1487.0 ft of Tubing Held safety meeting Retrieved Gun assembly Rigged down Tubing handling equipment Rigged up Completion string handling equipment Rigged up Completion string handling equipment (cont...) Ran Tubing to 9502.0 ft (3-1/2in OD) Space out tubulars Ran Tubing on landing string to 9502.0 ft Rigged up Circulating head Circulated at 9502.0 ft Rigged up Circulating head Set packer at 9443.0 ft with 2400.0 psi Tested Tubing Tested Casing Installed Hanger plug Tested Hanger plug Removed BOP stack Installed Xmas tree Tested Xmas tree Retrieved Hanger plug Freeze protect well - 150.000 bbl of Diesel Circulated at 2200.0 ft Facility Date/Time Progress Report PB G Pad Well G-26A Rig (null) Page Date 06:00-08:00 08:00-08:45 08:45-09:15 09:15-10:00 Duration 2hr 3/4 hr 1/2 hr 3/4 hr Activity Circulated at 2200.0 ft (cont...) Installed Hanger plug Tested Hanger plug Functioned Xmas tree 8 23 September 98 SEP i 7 1998 BPXA PDC Prudhoe Bay Unit Alaska State Plane Zone 4 PBU WOA G Pad G-26A SURVEY REPORT September, 1998 Your Ref: API-500292166101 Last Survey Date 02-September-98 Job# AKMWS0336 KBE- 74.57' DRILLING ¢; E RV I r" E ¢; Survey Reft svy3730 Sperry-Sun Drilling Services Survey Report for G-26A Your Ref: API-500292166101 Prudhoe Bay Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) (ft) 9652.17 40.550 141.110 8282.18 8356.75 2251.38 S 3019.36 E 5966879.79 N 661319.16 E -455.54 Tie-on Suwey 9690.00 40.920 141.110 8310.85 8385.42 2270.59 S 3034.86 E 5966860.90 N 661335.06 E 0.978 -452.34 WindowPoint 9716.66 43.400 137.000 8330.61 8405.18 2284.09 S 3046.59 E 5966847.65 N 661347.08 E 13.910 -450.67 9748.65 41.490 130.000 8354.23 8428.80 2298.95 S 3062.21E 5966833.13 N 661363.01E 15.921 -450.71 9779.99 36.220 126.000 8378.63 8453.20 2311.08 S 3077.67 E 5966821.33 N 661378.72 E 18.617 -452.61 9812.04 30.170 118.710 8405.45 8480.02 2320.53 S 3092.41E 5966812.20 N 661393.66 E 22.586 -455.95 9843.65 24.670 105.170 8433.52 8508.09 2326.08 S 3105.77 E 5966806.93 N 661407.13 E 26.207 -461.15 9875.31 23.080 100.930 8462.47 8537.04 2328.98 S 3118.24 E 5966804.29 N 661419.66 E 7.387 -467.66 9907.15 23.090 106.240 8491.77 8566.34 2331.91S 3130.37 E 5966801.61N 661431.84 E 6.537 -473.91 9939.07 24.050 121.780 8521.05 8595.62 2337.09 S 3141.92 E 5966796.68 N 661443.50 E 19.645 -478.14 9970.91 26.870 137.970 8549.83 8624.40 2345.87 S 3152.26 E 5966788.12 N 661454.03 E 23.501 -478.93 10003.08 29.910 152.510 8578.17 8652.74 2358.40 S 3160.85 E 5966775.77 N 661462.87 E 23.409 -475.79 10035.11 29.770 165.760 8605.98 8680.55 2373.21S 3166.49 E 5966761.09 N 861468.83 E 20.554 -468.97 10067.04 27.560 171.000 8634.00 8708.57 2388.19 S 3169.60 E 5966746.17 N 661472.25 E 10.477 -460.28 10098.99 26.970 171.680 8662.40 8736.97 2402.66 S 3171.80 E 5966731.75 N 661474.76 E 2.088 -451.33 10131.06 26.550 175.970 8691.04 8765.61 2417.01 S 3173.36 E 5966717.44 N 661476.62 E 6.163 -442.03 10162.91 26.430 187.600 8719.56 8794.13 2431.14 S 3172.92 E 5966703.30 N 661476.48 E 16.269 -431.50 10194.83 27.150 200.300 8748.08 8822.65 2445.03 S 3169.45 E 5966689.35 N 661473.31E 18.044 -419.06 10226.75 29.880 210.130 8776.14 8850.71 2458.75 S 3162.93 E 5966675.49 N 661467.07 E 16.983 -404.63 10258.87 35.490 219.080 8803.18 8877.75 2472.92 S 3153.02 E 5966661.11 N 661457.47 E 23.014 -387.53 10290.82 40.390 224.97.0_ 8828.38 8902.95 2487.46 S 3139.85 E 5966646.30 N 661444.60 E 19.056 -367.92 10322.91 44.040 228.650 8852.14 8926.71 2502.19 S 3124.12 E 5966631.24 N 661429.19 E 13.735 -346.41 10353.39 47.700 230.250 8873.36 8947.93 2516.40 S 3107.49 E 5966616.68 N 661412.86 E 12.584 -324.65 10385.42 52.330 233.720 8893.94 8968.51 2531.49 S 3088.15 E 5966601.19 N 661393.85 E 16.665 -300.38 10417.33 56.580 235.790 8912.49 8987.06 2546.46 S 3066.95 E 5966585.78 N 661372.96 E 14.325 -274.91 10449.28 62.930 238.680 8928.58 9003.15 2561.37 S 3043.74 E 5966570.38 N 661350.08 E 21.353 -248.11 10481.39 70.360 240.540 8941.30 9015.87 2576.26 S 3018.33 E 5966554.96 N 661324.98 E 23.741 -219.79 10513.35 76.310 241.720 8950.46 9025.03 2591.03 S 2991.52 E 5966539.63 N 661298.49 E 18.949 -190.60 10545.35 80.650 243.970 8956.85 9031.42 2605.33 S 2963.63 E 5966524.74 N 661270.91 E 15.212 -160.99 10577.39 83.640 243.500 8961.23 9035.80 2619.37 S 2935.17 E 5966510.10 N 661242.75 E 9.445 -131.19 Alaska State Plane Zone 4 PBU WOA G Pad Continued... 14 September, 1998 - 16:42 - 2 - DriflQuest Prudhoe Bay Unit Measured Sub-Sea Ve~ical Depth Incl. Azim. Depth Depth (~) (fi) 10609.36 88.890 243.050 8963.31 9037.88 10642.22 90,220 243.330 8963.57 9038.14 10667.10 87.900 246.300 8963.98 9038.55 10699.10 87,220 247.810 8965.34 9039.91 10731.00 85.890 247.140 8967.26 9041,83 10762.37 87.100 247.410 8969,17 9043.74 10794.51 88.670 247.090 8970.36 9044.93 10826.28 88.800 246.060 8971.06 9045.63 10857.85 89.970 246.680 8971.40 9045.97 10889.81, 90.590 248.530 8971.24 9045.81 10921.52 91.330 249.720 8970.71 9045.28 10953.51 91.920 251.550 8969.80 9044.37 10985.20 90,340 252.620 8969.18 9043.75 11017.38 89.880 252,410 8969.12 9043.69 11049.35 89.820 251.810 8969.20 9043.77 11081.34 91.570 251.540 8968.81 9043.38 11113.31 93.000 251.300 8967,54 9042.11 11145.49 92.930 251.600 8965.87 9040.44 11177.44 92,280 252.160 8964.42 9038.99 11209.24 91.510 252,390 8963.37 9037.94 11241.19 90.430 252.84~_ 8962.83 9037.40 11272.83 90.370 253,100 8962.61 9037.18 11304.49 90,960 252,440 8962.24 9036.81 11334.38 92.910 252.600 8961,23 9035.80 11366.09 93.610 252,290 8959.43 9034.00 11398.01 92.690 252.180 8957.68 9032.25 11429,43 91.600 252,980 8956.50 9031.07 11461.05 92,350 253,210 8955.41 9029.98 11492.62 92.320 252,530 8954.12 9028.69 11524.27 93,120 252,210 8952.62 9027.19 Sperry-Sun Drilling Services Survey Report for G-26A Your Ref: API-500292166101 Local Coordinates Nothings 2633.72 S 2648.54 S 2659.12 S 2671.58 S 2683.78 S 2695.88 S 2708.30 S 2720.92 S 2733.58 S 2745,75 S 2757.05 S 2767.65 S 2777.40 S 2787.07 S 2796.89 S 2806.95 S 2817.12 S 2827.35 S 2837.27 S 2846.95S 2856.49 S 2865.76 S 2875.14 S 2884.11S 2893.66 S 2903.38 S 2912.78 S 2921.97 S 2931.26 S 2940.84S Global Coordinates Dogleg Ve~ical Eastings Nothings Eastings Rate Section (fi) (fi) (fi) (°/100fi) (fi) 2906.69E 5966495.16N 661214.58E 16.482 -101.15 2877.36 E 5966479.72 N 661185.57 E 4.136 -70.18 2854.86 E 5966468.67 N 661163.29 E 15.146 -46.98 2825.42 E 5966455.59 N 661134.12 E 5.171 -17.64 2796.00 E 5966442.77 N 661104.97 E 4.667 11.49 2767.12 E 5966430.07 N 661076.35 E 3.952 40.17 2737.50 E 5966417.03 N 661047.00 E 4.985 69.61 2708.36 E 5966403.79 N 661018.13 E 3.267 98.86 2679.44 E 5966390.53 N 660989.48 E 4.194 127.98 2649.89 E 5966377.73 N 660960.20 E 6.105 157.19 2620.27 E 5966365.81N 660930.82 E 4.419 185.81 2590.10 E 5966354.58 N 660900.88 E 6.008 214.31 2559.96 E 5966344.20 N 660870.95 E 6.021 242.17 2529.26 E 5966333.88 N 660840.47 E 1.571 270.35 2498.84E 5966323.42 N 660810.26 E 1.886 298.46 2468.47 E 5966312.73 N 660780.11E 5.535 326.70 2438.20 E 5966301.91N 660750.06 E 4,535 354.96 2407,73 E 5966291.05 N 660719.81E - 0.956 383.39 2377.39 E 5966280.49 N 660689.69 E 2.684 411.52 2347.12 E 5966270.17 N 660659.63 E 2.527 439.42 2316.64 E 5966259.99 N 660629.35 E 3,662 467.37 2286.38 E 5966250.09 N 660599.30 E 0,843 494.96 2256.15 E 5966240.07 N 660569.27 E 2.796 522.61 2227.65 E 5966230.50 N 660540.97 E 6,546 548.77 2197.47 E 5966220.32 N 660511.00 E 2.414 576.52 2167.12 E 5966209.96 N 660480.86 E 2.903 604.51 2137.16 E 5966199.93 N 660451.11E 4.302 631.99 2106.93 E 5966190.10 N 660421.07 E 2.481 659.51 2076.78 E 5966180.18 N 660391.13 E 2.154 687.04 2046.65 E 5966169.97 N 660361.21 E 2.722 714.77 Comment Alaska State Plane Zone 4 PBU_WOA G Pad Continued... 14 September, 1998 - 16:42 - 3 - DrillQuest Sperry-Sun Drilling Services Survey Report for G-26A Your Ref: API-500292166101 Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 11556.10 92.620 253.220 8951.03 9025.60 11587.74 92.190 253.520 8949.70 9024.27 11610.79 90,770 253.400 8949.10 9023.67 11666.00 90.770 253.400 8948.36 9022.93 2950.28 S 2016,30 E 5966159.89 N 660331.06 E 3.537 742.56 2959.33 S 1986.01E 5966150.20 N 660300.97 E 1.657 770.01 2965,89 S 1963.92 E 5966143.18 N 660279.02 E 6.182 790.01 2981.66 S 1911.02 E 5966126.30 N 660226.46 E 0.000 837.94 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well, The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 223.657° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11666.00ft., The Bottom Hole Displacement is 3541.51ft., in the Direction of 147.343° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 9652.17 8356.75 2251.38 S 3019.36 E Tie-on Survey 9690.00 8385.42 -- 2270.59 S 3034.86 E Window Point 11666.00 9022.93 2981.66 S 1911.02 E Projected Survey Comment Projected Survey Alaska State Plane Zone 4 PBU WOA G Pad 14 September, 1998 - 16:42 - 4 - DrillQuest TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 August 10. 1998 Jamcs E. Smith Scnior Drilling Enginccr BP Exploration (Alaska) Inc. POBox 196612 Anchorage, AK 99519-6612 ac: Prudhoc Bay Unit G-26A BP Exploration (Alaska) Inc. Permit No. 98-151 Sur. Loc. 2583'SNL, 1974'WEL. Scc. 12. TI IN. R13E, UM Btmnholc Loc. 4984'NSL. 4543'WEL. Sec. 18, Ti IN. R14E, UM Dear Mr. Smith: Enclosed is thc approvcd application for permit to rcdrill the above referenced well. Thc permit to rcdrill docs not exempt you froTM obtaining additional permits required bv law from othcr governmental agencies, and does not authorize conducting drilling opcrations until all other required permitting dctcrminations arc made. Blowout prevention cquiplncnt (BOPE) must be tcstcd in accordancc with 20 AAC 25 035. Sufficicnt notice (approximatcly 24 hours) must be givcn to allow a ~:cpresentative of the Commission to witness a tcst of BOPE installcd prior to drilling ncw hole. Notice max; be given by contacting the Commission pctrolcum field inspector on thc North Slope pager at 659-3607. Chairman BY ORDER OF THE COMMISSION dlf/Enclosurcs cc; Dcpartmcnt of Fish & Game. Habitat Scction w/o cncl. Dcpartmcnt of Environmcntal Conservation w/o cncl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of w'ork [-1Drill I~Redrill llb. Typeofwell I-'lExploratory l--IStratigraphic Test I~Development Oil I-qRe-Entry E]DeepenI []Service r-lDevelopmen, tGas D Single Zone E] Mult.iple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE = 69.9' Prudhoe Bay Field / Prddhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028305 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 2583' SNL, 1974' WEL, SEC. 12, T11 N, R13E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 33' NSL, 3959' WEL, SEC. 07, T11N, R14E, UM G-26A , At total depth 9. Approximate spud date Amount $200,000.00 4984' NSL, 4543' WEL, SEC. 18, T11N, R14E, UM 08/12/98 12. Distance to nearest property line113. Distance to nearest well' 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028304, 296'I No Close Approach 2560 11267' MD / 8950' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 9700' MD Maximum Hole Angle 92° Maximum surface 2499 psig, At total depth (TVD) 8240' / 3323 psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of. Cement Hole Casing Weight Grade Coupling Length MD TVD MD 'TVD' (include stage data) 6" 4-1/2" 12.6# L-80 IBT-Mod 1568' 9550' 8260' 11267' 9020' 211 sx Class 'G' , , 19. To be completed for Redrill,Re-entry, and Deepen Operations. Present well condition summary /~:~',._~ (:} Total depth: measured 10650 feet Plugs (measured) true vertical 9129 feet Effective depth: measured 10570 feet Junk (measured) Fill at 10570' MD (06/89) /~aska 0il & Anchorage true vertical 9066 feet Casing Length Size Cemented MD 'I-VD Structural Conductor 110' 20" 9 cu yds concrete 145' 145' Surface 2654' 13-3/8" 3258 cu ft PF 'E', 465 cu ft PF 2689' 2689' Intermediate 9623' 9-5/8" 575 cu ft Class 'G' 9658' 8360' Production 1266' 7" 403 cu ft Class 'G' 9382' - 10648' 8150' - 9128' Liner Perforation depth: measured 10412' - 10417', 10460' - 10480', 10480' - 10500', 10500' - 10520', 10520' - 10536' true vertical subsea 8867' - 8968' (five intervals) , ,, 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements , ,, Contact Engineer NamelNumber: Bob Kaluza, 564-5344 Prepared By NarnelNurnben Terrie Hubble, 564-4628 ~17, hereby ce.~tify that the forgoing is true and correct to the best of my knowledge Signed 0~~t~i~ c"" ~ Title Senior Drillin~l En~lineer Date . '(~ Commission Use Only PermitNumber I APINumber I ApprovalDate ] Seecoverletter ~¢'-//,~/ 50-029-21661-01 t¢-~ -.- / ~ ~"O'O, for other requirements Conditions of Approval: Samples Required []Yes [~No Mud Log Required I-lYes [~No Hydrogen Sulfide Measures ]~]Yes l-]No Directional Survey Required .~'Yes I--INo Required Working Pressure for BOPE []2M; '~3M; []5M; [] 10M; [] 15M Other: ~,, ,9~i-~8.1 ~igi~UQ 15~j by order of Approved By DaVid W. Johflstori Commissioner the commission Date ............ "'* °~ Submit In Triplicate STATE OF ALASKA ALASKA L._ AND GAS CONSERVATION COM-,,:-c, SSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redriil lb. Type of well [] Exploratory I--I Stratigraphic Test i~ Development Oil [] Re-Entry [] Deepen []Service [] Development Gas 1-1Single Zone [-I Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE = 69.9' Prudhoe Bay Field / Prudhoe 3. Address i6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028305 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 2583' SNL, 1974' WEL, SEC. 12, T11N, R13E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 33' NSL, 3959' WEL, SEC. 07, T11 N, R14E, UM G-26A At total depth 9. Approximate spud date Amount $200,000.00 4984' NSL, 4543' WEL, SEC. 18, T11N, R14E, UM 08/12/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028304, 296'I No Close Approach 2560 11267' MD / 8950' TVD 16. TO be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} KickOff Depth 9700' MD Maximum HoleAngle 92° Maximum surface 2499 psig, At total depth (TVD) 8240'/3323 psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 6" 4-1/2" 12.6# L-80 IBT-Mod 1568' 9550' 8260' 11267' 9020' 211 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. ~' ~i G Present well condition summary /~. 3 Total depth: measured 10650 feet Plugs (measured) true vertical 9129 feet ~Jaska 0JJ & 888 CONS. CorrllTIjSSj(~ Effective depth: measured 10570 feet Junk (measured) Fill at 10570' MD (06/89) Anchorage true vertical 9066 feet Casing Length Size Cemented M D TVD Structural Conductor 110' 20" 9 cu yds concrete 145' 145' Surface 2654' 13-3/8" 3258 cuft PF 'E', 465 cu ft PF 2689' 2689' Intermediate 9623' 9-5/8" 575 cu ft Class 'G' 9658' 8360' Production 1266' 7" 403 cu ft Class 'G' 9382' - 10648' 8150' - 9128' Perforation depth: measured 10412' - 10417', 10460' - 10480', 10480' - 10500', 10500' - 10520', 10520' - 10536' true vertical subsea 8867' - 8968' (five intervals) , 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Bob Kaluza, 564-5344 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby ce~ify that the foregoing is true and correct to the best of my knowledge Signed j~ ~~ Title Senior Drilling Engineer Date Commission Use Only Permit Number APl Number I Approval Date See cover letter ~'-/,,~¢'" 50-029-21661-01I ~ "//~ '~ /¢ ~ for other requirements Conditions of Approval: Samples Required []Yes [] No Mud Log Required []Yes ~No Hydrogen Sulfide Measures J~Yes [] No Directional Survey Required ~Yes [--INo Required Working Pressure for BOPE ['-12M; 1~3M; [-I 5M; [] 10M; ['-I 15M Other: Approved By L)rlglR81 SigfluQ 5'~ by order of ~- '.: '..*..' '--..k~.-'_?.'-.n Commissioner the commission Date ~ -/¢--~ ~ Form 10-401 Rev. 12-01-85 Dzvid '¢~ ns Submit In Triplicate Well Name: G-26A Well Plan Summary I Type of Well (producer or injector): ]Producer I Surface Location: 2583' FNL, 1974' FEL, Sec. 12, TI IN, R13E X = 658,253 Y = 5,969,067 Target Start: 33' FSL, 3959 ]rIEL, Sec. 7, T11N, R14E X - 6661,251 Y = 5,966,466 Z = 8,960' TVDss Intermediate Target End: 4984' FSL, 4543' FEL, Sec. 18, T1 IN, R14E X = 660,675 Y = 5,966,125 Z = 8,950' TVDss [AFE Number: 1 4P1072 Estimated Start Date: 1 08/12/98 I MD 111,267' [ I TVDss: 18,950' IWell Design (conventional, slim hole, etc.): [Rig: i Doyon 14 Operating days to [ 19 complete: IKBE: 169.9, IExtended Horizontal Sidetrack Objective: Sidetrack out of existing 7" liner into the Sag River formation, directionally drill 6" hole to (1) Z1 target; TD at 11,267' MD, run, cmt and test 4 1/2" solid liner, complete with 4 ½", L-80 tbg, (2) GLM's and WOA tail assy. Formation Markers Formation Tops MD' TVD(RKB) Begin sidetrack 9,700' 8,392' Sidetrack from Whipstock out of 7 "liner into Sag River formation. TShublik 9,724' 8,410' TSAD 9,827' 8,489' TZ3 9,993' 8,640' TZ2C 10,073' 8,715' Present GOC 10,325' 8,930' TZ1B 10,335' 8,937' 14N 10,347' 8,945' TD 11,267' 9,020' Inverted tail section 20' rise over 640' run Casing/Tubing Program: Hole Csg/ WUFt Grade Conn Length Top Btm Size Tbg MDfrVD MD/TVD O.D. 6" 4 1/2" 12.6# L-go IBT 1,568' 9,550'/8,260' 11,267'/9,020' liner Mod 4 V2" 12.6# L-80 IBT 9,460' 30'/30' 9,490'/8,208' compl. Mod Logging Program: I Open Hole Logs: Drilling section: MWD/GR from KOP (9,700') to horizontal at 10,600'. MWD/GRfRes/NeufDen to TD at 11,267' MD. MADD pass as per Geologist request. DPC GR/Res/Neu/Den/Sonic will be run if Neu not obtained. Sample catchers and rig site geologist on site before drill out of window. Mud Program: Mud Program: Special design considerations Drill from KOP to TD with Quickdriln Polymer system. [ The formulation of the brine phase will be 6% KCL. Density LSRV LSRV Viscosity Chlorides pH (ppg) (cps) yield point funnel 8.7 35-55,000 12-20 50-65 30,000 8.5-9.0 to to to to to to 8.9 35-55,000 12-20 50- 65 30,000 8.5-9.0 If difficulty sliding, treat system with 1%-2 % Lubetex by volume. Ensure good stocks of LCM on location. Directional: KOP: 1) 9,700' MD, drill out of 7" liner via whipstock window at 140° azimuth, 41 o inclination, build and turn angle to 90° inclination, 242° azimuth to Start target, hold azimuth and invert tail 20' to TD at 11,267' MD. Maximum Hole Angle: 92° in horizontal section Close Approach Well: Point to point separation There are no close approach wells to this wellbore. Cement Data: Casing/Liner Lead: Tail: Sxs/Wt~ield Comments Sxs/Wt~ield P&A of original well 68/15.8/1.15 "G" at 15.8 ppg 4 1/2", 12.6#, L-80 liner 211/15.7/1.19 Class "G", 50% via inner string excess OH Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. NO ANNULAR INJECTION IN THIS WELL. G-26A Class II drilling wastes will be disposed at CC-2A grind and inject facility. If Class I wastes are generated, they will be taken to Pad 3 disposal site. Bottom hole pressure is 3,323 psi at 8,240' TVDss (estimated) Maximum shut-in casing pressure is 2,499 psi (assumes 0.1 psi/ft gas gradient to surface). Drilling Discussion Well Objective To date, there have been no dedicated Zone 1 horizontal completions in the central G-Pad LPA (low pressure area). Well G-26A targets mouth bar sands in the lower Romeo (13P) and distributary channel sands in the upper Romeo (14P). Reserves in the 102 acre drainage area are estimated to be 0.82 MMSTB, and the NLOC is estimated to be 42 ft.. G-26A has proximity to and improved ability to drain the thickening LPA LOC to the Northeast. The G-Pad LPA is a difficult area to analyze. This well will provide an offtake point in the G-Pad Low Pressure Area, provide the opportunity to monitor GOC in Zone 2 by logging and measure initial pressure gradient between Zone 1 and Zone 2. Drilling Objective The objective is to cut and pull the existing 4 ½" completion tubing and pull the 7" TIW retrievable packer, mill window via whipstock thru the 7", 26# casing @ 9,700' MD, directionally drill and geosteer 6" hole following the Zone 1 trend to TD + 11,267'; run, cement and test 4 1/2" liner (liner top + 9,550', shoe + 11,265'). The target is structurally low risk. No large faults are predicted but small faults can occur with the potential for fluid loss. Fluid losses could also occur due to expected low reservoir pressure. The well will be completed as a Zone 1 producer with a 4 ½", L-80, 12.6# liner, (2) GLM's and WOA tailpipe assy. The GLM's will be run with depths determined after log evaluation. DRILLING HAZARDS AND CONTINGENCIES Always have two levels of tested isolation before NU/ND. SURFACE CLOSE APPROACH WELL SHUT-INS There are two wells which need to be shut in during the rig move. Well spacing of the adjacent well to the North (G-05) is 40' and to the South (G-25) is 35'. Careful coordination with any ongoing pad or facility operations or activities will be initiated prior to commencing the rig move. DRILLING CLOSE APPROACH WELL SHUT-INS No shut-ins identified on Sperry Sun directional well plans due to close approach requirements. PORE PRESSURE: The pore pressure in the Sag River (KOP) is expected to be near 7.6 ppg EMW and the Sadlerochit is expected to be near 7.4 ppg. Pore pressure could be as low as 5.2 ppg EMW in Zone lB due to offset well data in this LPA area. 8.7 - 8.8 ppg mud will be used drilling the Sag River, Shublik and Sadlerochit formations and will provide sufficient overbalance to the reservoir pressure. The mud weight will be lowered if fluid losses occur in Zone lB but kept high enough to sufficiently provide overbalance for the upper Sadlerochit zones. HOLE PROBLEMS Reservoir pressures as low as 2400 psi may be encountered in Zone 1 which could cause loss of drilling fluid. Althought no faults are predicted, small faults can occur with the potential for fluid loss. No major faults have been identified and no major hole problems are expected. Casing Shoe Kick Tolerance The smallest kick tolerance for the casing shoe is calculated as 27.5 bbls of influx assuming a swabbed gas influx at the Sag River formation along the planned directional path. Based on 8.7 ppg MW (TSAG 9,657' MD & 8,350' TVD 7.8 ppg reservoir pore pressure), and min. frac at shoe of 12.0 ppg. TREE: 4" CIW WELLHEAD: FMC ACTUATOR: OTIS G-26 80 BTRS 2691' FOC-- I 7" TIW LINER HANGER J 3266' 9 5/8" 47# L- I I 8o uscc 4689' 4 1/2" 12.6# L-80 TDS TUBING TUBING ID: 3.958" CAPACITY: 0.0152 BBL/FT KB. ELEV =. ..... 40' BF. ELEV = 36.70' SSSV LANDING NIPPLE (OTIS) ( 3.813" ID) I 2101' GAS LIFT MANDRELS ( CAMCO w/ RK LATCH) N°- MD(BKB) TVDss 1 3228' 3152' 4 1/2" SLIDING SLEEVE (OTIS "XA")(3.813" ID) I 5413' 7" 26# NT-80S NSCC TIEBACK KOP: 2800' MAX ANGLE: 43° @ 6800' 7" TIW TIEBACK J RECEPTACLE 9382' 4 1/2" SLIDING SLEEVE (OTIS "XA")(3.813" ID) LATCH 7" RET PACKER (TIW HBBP-R) (4.00" ID) 9208' 9307' 9308' 95/8"47#L' I 80 BTRS 9657' PERFORATION SUMMARY REF LOG: SWS - BHCS 1 INTERVAL C 0,407- 10,417' RFS BEHIND STR 10,445 - 10,536' -14- PEN/SQZ'D Vlaraseal Sqz ,DDLE OPEN 7" MARKER JOINT 4 1/2" SLIDING SLEEVE (OTIS "XA") (3.813" ID) 7" PERM PACKER (TIW HBBP) (3.875" ID) 4 1/2 .... SWS" NIPPLE (PARKER) (3.813" ID) 4 1/2 ....XN" NIPPLE )(3.725" ID) 4 1/2" WLEG ELMD 9680' I I 10386' I 0396-398 10410' 10431' 10440' 10447' 10451' 10443' TREE: 4" CIW WELLHEAD: FMC ACTUATOR: OTIS -26A KB. ELEV = BF. ELEV = 133/8"72# L-80 I BTRS 2691' FOC 7" TIW LINER HANGER I 3266' 9 5/8" 47# L-80 sco I 4689' I SSSV LANDING NIPPLE I (OTIS)( 3.813" ID) ! iGAS LIFT MANDRELS ( CAMCO w/ RK LATCH) 4 1/2" 12.6# L-80 TDS TUBING TUBING ID: 3.958" CAPACITY: 0.0152 BBL/FT 2101' 7" 26# NT-80S NSCC TIEBACK KOP: 2800' MAX ANGLE: 43° @ 6800' 7" TIW TIEBACK I RECEPTACLE 9382' I 4-1/2" X Nipple 7" Production Packer @ 9500' MD 4-1/2" X Nipple 4-1/2" XN Nipple 95/8"47#L- ] 80 BTRS 9657' 4-1/2" Liner Top @ 9550' MD Whipstock @ 9700' MD Tubing Cut @ 9720' MD PERFORATION SUMMARY REF LOG: SWS - BHCS 11-14- MPEN/SQZ'D araseal Sqz INTERVAL 0,407 - 10,417' RFS BEHIND STR, 10,445 - 10,536' 4-1/2" 12.6# L-80 IRT Liner TD @ 11,268' MD PBTD @ 11,188' MD Sh~ '! Services Drilling I DrillQue =roposal Data for G-26A WP8 I0~1 Vertical Notthlngs Earrings V~'tlcalDogleg 8.191.84 2278.86 S .1040.29 E-450.11 8421.07 2299_56 S 3058.06 E -447.4012.000 8569.99 2357.31 S 313237 E -456.9216.000 g638.20 2371.81 S 3152.70 E -460.4617,000 ~14.91 2399.98 5; 3164.25 E -44&06 13.000 8T/0.~6 2423.97 S 316&09 E -43335 0.000 9040.02 ~,g8.24 S 2920.29 E -71.09 17.000 ~019.91 2992.42 S 2359.43 E 536.16 0,004 Vv-e//. G-26A Wp8 Proposal Target Summary Target Name: 'I VDss: TVDrkb: Wellhead Off~ets: Global Coordinates: G-26A T4 8950.00 9019.91 2992.42 S, 2359.43 E 5966125.00 N,660675.00E SURFACE LOCATION PLOT DATE · 21-Jul-98 Hodzontal Coordinates: 5969067.00 N,658253.00 E 35.3o ~ R~ (EST) 34.61 ft Well (CBE) 69.91 ft RKB - AMSL NAD27 Alaska State Ptanes, Zone 4, US Foot ~OP' ° : 9~100--fi-~D~ ~-21.0--7f1 TV-D- Start Dir @ 12.000°/100ft: V--D-i'r ~ln~se-~"~ 6~/~700.~00~ MD, 8391.84, TVD  r Rate Increase @ 17.( ~ -- eorease-~43, Increase @ 17.000°/100ft · 9917.! 0Cu3°/100fi: 9990. n~d Dir, Sail @ 23.478° · 10073.42ft MD, __2~ Dir @ 17.000°/100ft: 10134.42ft IV 9ft MD, 8569.~99ft TVD . r'm ~r~ 8638.20~ 'D!D 8714.91fl TVD - D, 8770.86ft 'I-VD \~(3.(3~,.~. 4 1/2" Uner MD TVD ~(51~o 11267.27 --~ C, ~9019.91 ~ ~ ~ ' ~-~--A~--~--~ I I I -4O0 -200 0 200 lc. ale: 1inch = 20Oft Vertical Section I 4oo TSGR - 8375.91 TVD TSHU - 8409.91 TVD tsar- &ss.91 TV~ T'Z3 - 8639.91 TVD TZ2C - 8714.91 TVD 23N- 8792.9/TVD_ 24N- 8809.91 TVD 21N - 8897.91 TVD 14N** - 894,L91 TVD 14P** - 8969.91 TVD 13P** - 9022,91 HOT - 9039.91 TVD 9010.91 ~ I I 600 800 Section Azimuth: 223.657' (True North) o/~ared oerwces urllllng Well' G-26A Wp8 j DrillQuest" Proposal Data for G-26A WP8 ~c.~m~c~,: wea ~ Relerence: /~ ~u~: 223.557' V~ ~ ~n: 0.~ N.0.~ E ~ ~1, Az~. W~I N~J ~Jt~a V~ ~ ~ S~ ~te ~?C~}.Utl ~1944 141.111111391,84 2278.86 S ~.29E 4~11 97~.1~ 45.15.t 1.17.T358421.07 2~.~S ~58.~ E -aT.~ 12.~ Wl~.W 21.~1 II~.~ 899.~ ~5~.3l S 313~ ~ 4~92 16.~ ~,77 21.~ 143.~ ~38.20 2371.81 S 1~73.4223.478170.~2 8714.91 ~.98 S 31~.~ E -~&~ 13.~ 101M.42 21,478IT0.~2 8770.~ 2423.97 S 31~.~ B ~33.35 0.~ 1~.92 91.792241.530 ~.02 2~.~S 29~.29 E .31.~ 11267.2~91.819241.52~ ~19.91 ~2.42 S 235~.43 E ~.16 0.~ Proposal Target Summary Target Name: TVDss: T'VDrkb: Wellhead Offsets: Gh)bul Ctx)rdinatcs: G-26A T4 8950.00 9019.91 2992.42 S, 2359.43 E5966125.00 N,660675.00E SURFACE LOCATION 21-Jul-98 Horizontal Coordlnatee: 596~O~7.00 N,858253.00 E RKB Elevetlon: 35.30 It Rig (EST) 34.61 It Well (CBE) 69.91 It RKB- AMSL Coordinate Syltem: NAD27 ~Jllkl $11ll Planes, Zone 4, US Foot PLOT D/~ Created By: Checked By: -2300 - -2500 - ~0.2700 - -2900 - Scale: linch = 20Oft 22100 24j00 26j00 Eastings 28100 30100 32100 34100 KOP: Start Dlr @ 12.000°/100ft: 9700.00ft MD, 8391.84ft Dir Rate Increase @ 16.000°/100ft: 9740.00ft MD, 8421.07ft Dir Rate Increase @ 17.000°/100ft: 9917:99ft MD Dlr Rate Decrease @ 13.000°/100ft: 9990.77ft End Dir, Sail @ 23.478°: 10073.42ft MD, 8714.91ft Start DIr @ 17.000°/100ft: 10134.42ft MD, Dir Rate Decrease @ 0.004°/100ft· 10628.921 / .. OO.O0 4 1/2" Liner 11267.27 9019,91 TVD 9040.02ft TVD. '.78 - -2300 --2500 -- -2700 ~0 --2900 II Sperry-Sun Drifting Services Proposal Report for G-26A WP8 Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_WOA G Pad Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth N,, 0rthings Eastings Northings Eastings Rate Section Comment (ft) (fi) (fi) (fi) (ft) (fi) (fi) (°/100fi) (fi) 9700.00 40.944 141.118 8321.93 8391.84 2278.86 S 3040.29 E 5966852.76 N 661340.66 E -450.11 KOP: Start DIr @ 12.000°/100ft: 9700.00ft MD, 8391.84ft TVD 9724.40 43.500 138.991 8340.00 8409.91 2291.42 S 3050.82 E 5966840.42 N 661351.46 E 12.000 -448.29 TSHU 9740.00 45.153 137.735 8351.16 8421.07 2299.56 S 3058.06 E 5966832.43 N 661358.87 E 12.000 -447.40 Dir Rate Increase @ 16.000°/100ft: 9740.00ft MD, 8421.07ft TVD 9800.00 36.384 131.719 8396.57 8466.48 2327.21 S 3085.72 E 5966805.37 N 661387.10 E 16.000 -446.49 9827.21 32.537 128.114 8419.00 8488.91 2337.10 S 3097.50 E 5966795.73 N 661399.09 E 16.000 -447.47 TSAD 9900.00 23.037 113.429 8483.40 8553.31 2354.91 S 3126.07 E 5966778.53 N 661428.03 E 16.000 -454.31 9917.99 21.000 108.000 8500.08 8569.99 2357.31 S 3132.37 E 5966776.27-N 661434.38 E 16.000 -456.92 Dir Rate Increase @ 17.000°/100ft: 9917.99ft MD, 8569.99ff ']'VD 9990.77 21.000 143.000 8568.29 8638.20 2371.81 ,S 3152.70 E 5966762.20 N 661455.01 E 17.000 -460.46 Dir Rate Decrease @ 13.000°/100ff: 9990.77ft MD, 8638.20ft TVD 9992.60 21.001 143.665 8570.00 8639.91 2372.33 S 3153.09 E 5966761.68 N 661455.41 E 13.000 -460.35 TZ3 10000.00 21.033 146.346 8576.91 8646.82 2374.51 S 3154.61 E 5966759.54 N 661456.98 E 13.000 -459.83 10073.42 23.478 170.902 8645.00 8714.91 2399.98 S 3164.25 E 5966734.28 N 661467.15 E 13.000 -448.06 EndDir Sail @ 23.478°: 10073.42ft MD, 8714.91ft TVD TZ2C ' 10100.00 23.478 170.902 8669.38 8739.29 2410.43 S 3165.92 E 5966723.86 N 661469.04 E 0.000 -441.65 10134.42 23,478 170.902 8700.95 8770.86 2423.97 S 3168.09 E 5966710.37 N 661471.50 E 0.000 -433.35 Start DIr @ 17.000°/100ft: 10134.42ft MD, 8770.86ft TVD 10158.60 25.074 180.130 8723.00 8792.91 2433.86 S 3168.84 E 5966700.50 N 661472.46 E 17.000 -426.72 23N 10177.49 26.674 186.515 8740.00 8809.91 2442.07 S 3168.35 E 5966692.28 N 661472.14 E 17.000 -420.43 24N 10200.00 28.909 193.184 8759.92 8829.83 2452.39 S 3166.53 E 5966681.92 N 661470.54 E 17.000 -411.71 10282.01 39.022 210.579 8828.00 8897.91 2494.12 S 3148.79 E 5966639.82 N 661453.68 E 17.000 -369.27 21N 10300.00 41.503 213.348 8841.73 8911.64 2503.98 S 3142.63 E 5966629.84 N 661447.73 E 17.000 -357.89 10325.10 45.063 216.782 8860.00 8929.91 2518.05 S 3132.74 E 5966615.57 N 661438.14 E 17.000 -340.88 PGOC 10335.13 46.513 218.037 8867.00 8936.91 2523.77 S 3128.37 E 5966609.76 N 661433.89 E 17.000 -333.73 TZ1B 10346.95 48.236 219.438 8875.00 8944.91 1"7 10386.85 54.168 223.669 8900.00 8969.91 2530.64 S 3122.93 E 5966602.87 N 661428.59 E 17.000 -325.07 14N** 2553.77 S 3102.28 E 5966579.22 N 661408.44 E 17.000 -294.01 14P** 10400.00 56.152 224.923 8907.51 8977.42 25{~1.49 S 3094.74 E 5966571.34 N 661401.07 E 17.000 -283.22 10500.00 71.555 232.980 8951.50 9021.41 2619.88 S 3027.05 E 5966511.53 N 661334.62 E 17.000 -194.25 10600.00 87.240 239.672 8969.87 9039.78 2674.05 S 2945.47 E 5966455.65 N 661254.20 E 17.000 -98.74 10628.92 91.792 241.530 8970,11 904~).02 2688.24 S 2920.29 E 5966440.93 N 661229.32 E 17.000 -71,09 Dir Rate Decrease @ 0.004°/100ft: 10628.92ft MD, 9040.02ft TVD 10700.00 91.795 241.529 8967.89 9037.80 2722.11 S 2857.83 E 5966405.75 N 661167.60 E 0.004 -3.47 10800.00 91.799 241.529 8964.75 9034.66 2769.76 S 2769.97 E 5966356.26 N 661080.76 E 0.004 91.66 10900.00 91.803 241.528 8961.61 9031.52 2817.41 S 2682.11 E 5966306.77 N 660993.92 E 0.004 186.79 11000.00 91.807 241.527 8958.46 9028.37. 2865.06 S 2594.25 E 5966257.28 N 660907.08 E 0.004 281.92 Con#nued... 21 July, 1998.16:13 . I - DrlllQuest Sperry-Sun Drilling Services Proposal Report for G-26A WP8 Prudhoe Bay Unit Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth N,,o.rthings Eastings (ft) (ft) (ft) (ft) (ft) 11100.00 91.812 241.527 8955.30 9025.21 2912.71 S 2506.39 E 11200.00 91.816 241.526 8952.13 9022.04 2960.36 S 2418.53 E 11267.27 91.819 241.525 8950.00 9019.91 2992.42 $ 2359.43 E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (fi) (fi) (°/lOOft) (fi) 5966207.79 N 660820.25 E 0.004 377.04 5966158.29 N 660733.41 E 0.004 472.17 5966125.00 N 660675.00 E 0.004 536.16 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 223.657° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11267.27ft., The Bottom Hole Displacement is 3810.70ft., in the Direction of 141.745° (True). Comment Total Deoth: 11267.27ft MD 9019.91ft TVD 4 1/2' Liher ' Target: G-26A T4, Geological Alaska State Plane Zone 4 PBU_WOA G Pad 21 July, 1998- 16:13 -2- DrillQuest Sperry-Sun Drilling Services Proposal Report for G-26A WP8 Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_WOA G Pad Measured Vertical Depth Incl. Azim. Depth Northings Eastings (ft) (ft) (ft) (ft) 9700.00 40.944 141.118 8391.84 2278.66 S 3040.29 E 9740.00 45.153 137.735 8421.07 2299.56 S 3058.06 E 9917.99 21.000 108.000 8569.99 2357.31 S 3132.37 E 9990.77 21.000 143.000 8638.20 2371.81 S 3152.70 E 10073.42 23.478 170.902 8714.91 2399.98 S 3164.25 E 10134.42 23.478 170.902 8770.86 2423.97 S 3168.09 E 10628.92 91.792 241.530 9040.02 2688.24 S 2920.29 E 11267.27 91.819 241.525 9019.91 2992.42 S 2359.43 E Vertical Dogleg Section Rate (ft) (°/100ft) - -450.1'1 -447.40 12,000 -456.92 16.000 -460.46 17.000 -448.06 13.000 -433.35 0.000 ~71.09 17.000 536.16 0.004 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 223.657° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11267.27ft., The Bottom Hole Displacement is 3810.70ft., in the Direction of 141.745° (True). Comments Measured Station Coordinates Depth TVD Northings Eastlngs (ft) (ft) (ft) (ft) 9700.00 8391.84 2278.86 S 3040.29 E 9740.00 8421.07 2299.56 S 3058.06 E 9917.99 8569.99 2357.31 S 3132.37 E 9990.77 8638.20 2371.81 S 3152.70 E 10073.42 8714.91 2399.98 S 3164.25 E 10134.42 8770.86 2423.97 S 3168.09 E 10628.92 9040.02 2688.24 S 2920.29 E 11267.27 9019.91 2992.42 S 2359.43 E Comment KOP: Start Dir @ 12.000°/100ft: 9700.00ft MD, 8391.84ft 'I-VD Dir Rate Increase @ 16.000°/100ft: 9740.00ft MD, 8421.07ft TVD Dir Rate Increase @ 17.000°/100ft: 9917.99ft MD, 8569.99ft TVD Dir Rate Decrease @ 13,000°/100ft: 9990.77ft MD, 8638.20ft TVD End Dir, Sail @ 23.478°: 10073.42ft MD, 8714.91ft TVD Start Dir @ 17.000°/100ft: 10134.42ft MD, 8770.86ft TVD Dir Rate Decrease @ 0.004°/10Oft: 10628.92ft MD, 9040.02ft TVD Total Depth: 11267.27ft MD, 9019.91ft TVD Formation Tops Measured Vertical Sub-Sea Depth Depth Depth Northings Eastings Formation Name (ft) (fi) (ft) (f~) (ft) 9724.40 8409.91 8340,00 2291.42 S 3050.82 E TSHU 9827.21 8488.91 8419,00 2337.10 S 3097.50 E TSAD 9992.60 8639.91 8570,00 2372.33 S 3153.09 E TZ3 10073.42 8714.91 8645,00 2399.98 S · 3164.25 E TZ2C 10158.60 8792.91 '~ 8723,00 2433.86 S 3168.64 E 23N 10177.49 8809.91 8740.00 2442.07 S 3168.35 E 24N 10282.01 8897.91 8828.00 2494.12 S 3148.79 E 21N 10325.10 8929.91 8860,00 2518.05 S 3132.74 E PGOC 10335.13 8936.91 8867,00 2523.77 S 3128.37 E TZlB 10346.95 8944.91 8875,00 2530.54 S 3122.93 E 14N** 10386.85 8969.91 8900,00 2553.77 S 3102.28 E 14P** Casing details From Measured Vertical Depth Depth (ft) (f~) <Surface> <Surface:, To Measured Vertical Depth Depth (ft) (ft) <Run-TD> <Run-TD> Casing Detail 4 1/2' Liner Continued... Alaska hared · ervlces rilling WELL NAME G-26A I DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET The attached work cannot commence without obtaining the required signatures in the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: (only one category per cover sheet) DRILLING PERMIT FI Permit D~gmen~/~epared: ODE: ,A.- tz~. /\ ~.~, ~ Date:__ [~ Permit/~pplicatio~wed: SDEfES :~A_ ~ Date:~°/7~ ~, Permit ~pli~ati~n Su~ted: TA:~,~ ~_~_ Date:~l [--] SUNDRY NOTICE D Sundry Documentation Prepared: ODE: Date: ~ Sundry Application Reviewed: SDE/ES: Date: D Sundry Application Submitted: TA: Date: ['-] PRE-RIG WORK [-~ Pre-Rig Memo Reviewed: SDE/ES: Date: ['~ Pre-Rig Memo Sent to Slope: ODE: Date: ["-'] Pre-Rig Sundry Documentation Prepared: ODE: Date: /-~ Pre-Rig Sundry Application Reviewed: SDE/ES: Date: [~ Pre-Rig Sundry Application Submitted: TA: Date: NOTE: IF SUNDRY IS FOR PRE-RIG WORK, USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW Reason for Sundry (Check all that apply) Abandon Alter Casing Suspend Repair Well Plugging Pull Tubing Variance Other(Explain): Change Approved Program Operation Shutdown Re-enter Suspended Well Time Extension Perforate Stimulate i~ k~ ~ ~I V~ APPROVAL TO PROCEED Wel[Name: ] G-26A Well Plan Summary I Type of Well (producer or injector): I Producer Surface Location: 2583' FNL, 1974' FEL, Sec. 12, T1 IN, R13E X = 658,253 Y-- 5,969,067 Target Start: 33' FSL, 3959 FEL, Sec. 7, T1 IN, R14E X = 6661,251 Y = 5,966,466 Z = 8,960' TVDss Intermediate Target End: 4984' FSL, 4543' FEL, Sec. 18, T1 IN, R14E X = 660,675 Y = 5,966,125 Z = 8,950' TVDss ]AFE Number: 14P1072 I Estimated Start Date: I 08/12/98 ] I MD ]11,267' I ITVDss: 18,950, Well Design (conventional, slim hole, etc.): I Rig: I Doyon 14 IOperating days to complete: 19 [KBE: 169.9' IExtended Horizontal Sidetrack Objective: Sidetrack out of existing 7" liner into the Sag River formation, directionally drill 6" hole to (1) Z1 target; TD at 11,267' MD, run, cmt and test 4 1/2" solid liner, complete with 4 V2", L-80 tbg, (2) GLM's and WOA tail assy. Formation Markers Formation Tops MD TVD(RKB) Begin sidetrack 9,700' 8,392' Sidetrack from Whipstock out of 7 "liner into Sag River formation. TShublik 9,724' 8,410' TSAD 9,827' 8,489' TZ3 9,993' 8,640' TZ2C 10,073' 8,715' Present GOC 10,325' 8,930' TZ1B 10,335' 8,937' 14N 10,347' 8,945' TD 11,267' 9,020' Inverted tail section 20' rise over 640' run Casing/Tubing Program: Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbg MDfYVD MD/TVD O.D. 6" 4 1/2" 12.6# L-80 IBT 1,568' 9,550'/8,260' 11,267'/9,020' liner Mod 4 t/2" 12.6# L-80 IBT 9,460' 30'/30' 9,490'/8,208' compl. Mod Logging Program: I Open Hole Logs: Drilling section: MWD/GR from KOP (9,700') to horizontal at 10,600'. MWD/GR/Res/Neu/Den-to TD at 11,267' MD. M_ADD pass as per Geologist request. DPC GR/Res/Neu/Den/Sonic will be run if Neu not obtained. Sample catchers and rig site geologist on site before drill out of window. Mud Program: Mud Program: Special design Drill from KOP to TD with Quickdriln Polymer system. considerations The formulation of the brine phase will be 6% KCL. Density LSRV LSRV Viscosity Chlorides pH (ppg) (cps) yield point funnel 8.7 35-55,000 12-20 50-65 30,000 8.5-9.0 to to to to to to 8.9 35-55,000 12-20 50-65 30,000 8.5-9.0 If difficulty sliding, treat system with 1%-2 % Lubetex by volume. Ensure good stocks of LCM on location. 4 Directional: KOP: 1) 9,700' MD, drill out of 7 "liner via whipstock window at 140° azimuth, 41 o inclination, build and turn angle to 90° inclination, 242° azimuth to Start target, hold azimuth and invert tail 20' to TD at 11,267' MD. Maximum Hole Angle: 1 92° in horizontal section Close Approach Well:] There are no close approach wells to this Point to point separation wellbore. Cement Data: Casing/Liner Lead: Tail: Sxs/Wt/Yield Comments Sxs/Wt/Yield P&A of original well 68/15.8/1.15 "G" at 15.8 ppg 4 1/2", 12.6#, L-80 liner 211/15.7/1.19 Class "G", 50% via inner string excess OH Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. NO ANNULAR INJECTION IN THIS WELL. G-26A Class II drilling wastes will be disposed at CC-2A grind and inject facility. If Class I wastes are generated, they will be taken to Pad 3 disposal site. Bottom hole pressure is 3,323 psi at 8,240' TVDss (estimated) Maximum shut-in casing pressure is 2,499 psi (assumes 0.1 psi/ft gas gradient to surface). Drilling Discussion Well Objective To date, there have been no dedicated Zone 1 horizontal completions in the central G-Pad LPA (low pressure area). Well G-26A targets mouth bar sands in the lower Romeo (13P) and distributary channel sands in the upper Romeo (14P). Reserves in the 102 acre drainage area are estimated to be 0.82 MMSTB, and the NLOC is estimated to be 42 ft.. G-26A has proximity to and improved ability to drain the thickening LPA LOC to the Northeast. The G-Pad LPA is a difficult area to analyze. This well will provide an offtake point in the G-Pad Low Pressure Area, provide the opportunity to monitor GOC in Zone 2 by logging and measure initial pressure gradient between Zone 1 and Zone 2. Drilling Objective The objective is to cut and pull the existing 4 ¥2" completion tubing and pull the 7" TIW retrievable packer, mill window via whipstock thru the 7", 264/ casing @ 9,700' MD, directionally drill and geosteer 6" hole following the Zone 1 trend to TD + 11,267'; run, cement and test 4 1/2" liner (liner top + 9,550', shoe + 11,265'). The target is structurally low risk. No large faults are predicted but small faults can occur with the potential for fluid loss. Fluid losses could also occur due to expected low reservoir pressure. The well will be completed as a Zone 1 producer with a 4 V2", L-80, 12.6//liner, (2) GLM's and WOA tailpipe assy. The GLM's will be run with depths determined after log evaluation. DRILLING HAZARDS AND CONTINGENCIES Always have two levels of tested isolation before NU/ND. SURFACE CLOSE APPROACH WELL SHUT-INS There are two wells which need to be shut in during the rig move. Well spacing of the adjacent well to the North (G-05) is 40' and to the South (G-25) is 35'. Careful coordination with any ongoing pad or facility operations or activities will be initiated prior to commencing the rig move. DRILLING CLOSE APPROACH WELL SHUT-INS No shut-ins identified on Sperry Sun directional well plans due to close approach requirements. PORE PRESSURE: The pore pressure in the Sag River (KOP) is expected to be near 7.6 ppg EMW and the Sadlerochit is expected to be near 7.4 ppg. Pore pressure could be as low as 5.2 ppg EMW in Zone lB due to offset well data in this LPA area. 8.7 - 8.8 ppg mud will be used drilling the Sag River, Shublik and Sadlerochit formations and will provide sufficient overbalance to the reservoir pressure. The mud weight will be lowered if fluid losses occur in Zone lB but kept high enough to sufficiently provide overbalance for the upper Sadlerochit zones. HOLE PROBLEMS Reservoir pressures as low as 2400 psi may be encountered in Zone 1 which could cause loss of drilling fluid. Althought no faults are predicted, small faults can occur with the potential for fluid loss. No major faults have been identified and no major hole problems are expected. Casing Shoe Kick Tolerance The smallest kick tolerance for the casing shoe is calculated as 27.5 bbls of influx assuming a swabbed gas influx at the Sag River formation along the planned directional path. Based on 8.7 ppg MW (TSAG 9,657' MD & 8,350' TVD 7.8 ppg reservoir pore pressure), and min. frac at shoe of 12.0 ppg. TREE: 4" CIW WELLHEAD: FMC ACTUATOR: OTIS .G-26 80 BTRS 2691' ~ FOC-- / 7" TIW LINER HANGER I 3266' 9 5,8" 47# L- I 8o uscc 4689' 4 1/2" 12.6# L-80 TDS TUBING ,, TUBING ID: 3.958 CAPACITY: 0.0152 BBL/FT KB. ELEV '72.40' BF. ELEV .~ :.~6.70' SSSV LANDING NIPPLE (OTIS) ( 3.813" ID) I 2101' I GAS LIFT MANDRELS ( CAMCO w! RK LATCH) N°. MD(BKB) TVDss 1 3228' 3152' 41/2" SLIDING SLEEVE (OTIS "XA") (3.813" ID) I 5413' 7" 26# NT-80S NSCC TIEBACK KOP: 2800' MAX ANGLE: 43° @ 6800' 7" TIW TIEBACK RECEPTACLE I 9382' I 4 1/2" SLIDING SLEEVE (OTIS "XA")(3.813" ID) LATCH 7" RET PACKER (TIW HBBP-R) (4.00" ID) 9208' 9307' 9308' 95/8"47#L' I 80 BTRS 9657' PERFORATION SUMMARY REF LOG: SWS - BHCS 1 c 31/8"I 4 110,407-10,417' 33~8B VE4P 5B E. 1~l~5D36S,TR -14- PEN/SQZ'D Maraseal Sqz ~.DDLE OPEN 7" MARKER JOINT 4 1/2" SLIDING SLEEVE (OTIS "XA")(3.813" ID) 7" PERM PACKER (TIW HBBP) (3.875" ID) 4 1/2 .... SWS" NIPPLE (PARKER) (3.813" ID) 4 1/2 .... XN" NIPPLE (3.725" ID) 4 1/2" WLEG ELMD 9680' I 10386' 110396-398 I 10410' 10431' 10440' 10447' 10451' 10443' PBTD J 1 t~ R;CIR' J TREE: 4" CIW WE. LLHEAD: FMC ACTUATOR: OTIS 3-26A KB. ELEV BF. ELEV ..... 133/8" 72# L'80 I BTRS 2691' FCC-- 7" TIW LINER HANGER I 3266' 9 5/8" 47# L-80 NSCC ] 4689' I SSSV LANDING NIPPLE (OTIS) ( 3.813" ID) I 2101' I GAS LIFT MANDRELS ( CAMCO w/ RK LATCH) N° MD(EKE) TVDss 1 2 4 1/2" 12.6# L-80 TDS TUBING TUBING ID: 3.958" CAPACITY: 0.0152 BBL/FT 7" 26# NT-80S NSCC TIEBACK KOP: 2800' MAX ANGLE: 43° @ 6800' 7" TIW TIEBACK RECEPTACLE I 9382' I' 4-1/2" X Nipple 7" Production Packer @ 9500' MD 4-1/2" X Nipple 4-1/2" XN Nipple 95/8"47#L' I 80 BTRS 9657' 4-1/2" Liner Top @ 9550' MD Whipstock @ 9700' MD Tubing Cut @ 9720' MD PERFORATION SUMMARY REF LOG: SWS - BHCS 1 3 1/8"I 4 110,407- 10,417' 33~8B V%P 5BE_ H1~5D36S, TR -14- PEN/SQZ'D Maraseal Sqz ~DDLE OPEN PBTD I t N R;N~' I 4-1/2" 12.6# L-80 IRT Liner TD @ 11,268' MD PBTD @ 11,188' MD Oroposal Data for G-26A WP8 100~ Vertical Nmt~lng~ Ea~l~gs Veq'lJcal D~gleg 8391.84 2278.86 S 3040.29 E -450.11 8421.07 2299.56 S 3058.06 E -447.4012.000 S5~9.99 2357.31 S 3132.37 E -45~.92 g635.20 2371,81 S 3152.70 E -460.4~17.000 · /14.91 239~.95 S 3164.25 E -44&0~ 13.000 ~/'/0.~ 2423.97 S 3168.09 E -433.350.000 9040.02 2688.24 S 2920.29 E -71.09 17.000 ~019.91 2992.42 S 2359.43 E 536.16 0.004 Shared Services Drilling . .~'ell' G-26A Wp8 Proposal Target Summary DrillQue Target Name: G-26A T4 TVDss: TVDrkb: Wellhead Offsets: Global Coordinates: 8950.00 9o19.91 2992.42 $, 2359.43 E 5966125.00 N,660675.00E SURFACE LOCATION PLOT DATE · 21-Jul-98 Horizontal Coordinates: 5969(~7.00 N,658253.00 E RKB Elevation: 35.30 ft Rig (EST) 34.61 ft Well (CBE) 69.91 ft RKB - AMSL Coordinate System: NAD27 Naska State Planes, Zone 4, US Fool · Start Dir @ 12.000°/100ft: 9700.00 R-~-~I nc-"f~se--~'~ 6.'-~-'6°/1-0'E~: 9~ Rate Increase @ 17.000°/100ft: 9917. Y~e-Dec, rease@ ! 3.0000/100ff: 9990 ~LEnd D/r, Sail @ 23.478°: 10073.42ft MD Dir @ 17.000°/100ft: 10134.42ft IV rt MD, 8391.84ft TVD 00--f[-~ D~21.0-E?-~ ~ 19ft MD, 8569.,99ft 'I'VD 77.~ MD, 8~38.20ff ~./D 8714.91ff TVD - 9,8770.86ffTVD 4 1/2" Liner 11267.27 MD 19.91 TVD TSGR - 8375.91 TVD TSHU - 8409.91 TVD TSAD - 8488.91 TVD TZ3 - 8639.91 TVD TZ2C- 8714.91 TVD 23N- R792_91 TVD_ 24N- 8809.91 TVD 21N- 889Z91 TVD 14N** - 8944.91 TVD 14P** - 8969.91 TVD I I -400 -200 ~.ale: linch = 200ft G-26A WP8 "~ 6'-28,q/'4 9019.91 ~ 2992.42 $. ~3~9.~L°, £ I3P** - 9022.91 TVD HOT- 9039.91 TVD I 200 Vertical Section I I I 400 600 800 Section Azimuth: 223.657° (True North) Shared Services Drilling Well' G-26A Wp8 DrillQuesf Proposal Data for G-26A WP8 Vedicai C~gln: Well Well ~ Relel~tx:e: Tn.~ Norb~ , V~ ~u~: 223.657' , V~ ~ ~d~: W~ V~ ~ ~n: 0.~ N,O.~ E 97L~1.(}0 4~).944 i4 I. I I 8 8391.84 2278.86 S 3040.29 E -4~O. I I 9740.{~1 4.~.15.t 1.17.7358421.07 2299.~6 S 3058.06 E -447.40 9917.9921.00011)8.0008569.99 2.157.31 S 313237 E -456.9216.000 9990.772 I.(XX) 14,~.0008638,20 2371.81 S 3157.70 B -460.4617.000 1~J~73.42 23.478170.902 8714,91 2399.98 S 3164,25 E -448.0613.000 10134.42 23.478170.902 8770.86 2423.97 S 3168.09 E -433.350.0~0 11}628.92 91.792241.530 9040.02 2688.24 S 2920.29 E -71.09 17.000 11267.27 91.819241.52~ 9OI9.91 2992.42 S 2359.43 E 536.16 0.004 Proposal Target Summary Taxget Name: TVDss: TVDrkb: Wellhead OITscts: Gh)bal C(x)rdin:,te~: G-26A T4 8950.00 9019.91 2992.42 S, 2359.43 E 5966125.00 N,660675.(X)E SURFACE LOCATION 21-J ul-98 Horizontal Coordlnatea: 596~067.00 N,658253.00 E RKB Elevation: 35.30 It Rig (EST) 34.61It Well (CBE) 69.91 It RKB- AMSL Coordinate Syitam: NAD27 Alaska Slate Planes, Zone 4. US Foot PLOT D~ Created By: Checked By: Scale: linch = 20Oft Eastings 22~00 24~)0 26100 28?0 -2300 - -2500 - ~0.2700 - -2900 - II 30100 3¥o KOP' Start Dar @ 12.000°/100ft· 9700.00ft MD, 8391.84ft Dar Rate Increase @ 16.000°/100ft· 9740.00ft MD, 00.00 Dar Rate Increase @ 17.000°/100ft: 9917:99ft MD, o Dar Rate Decrease @ 13.000°/100ft: 9990.77ft MD, End Dir, Sail @ 23.478°. 10073.42ft MD, 8714.91ft Start Dir @ 17.000'°/100ft: 10134.42ft MD, 8770. Dar Rate Decrease @ 0.004°/100ft· 9040.02ft 4 1/2" Liner 11267.27 9019.91 TVD 3, o - -2300 - -2500 - -2700 ~0 - -2900 II Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth 9700.00 40.944 141.118 8321.93 8391.84 9724.40 43.500 138.991 8340.00 8409.91 9740.00 45.153 137.735 8351.16 8421.07 9800.00 36.384 131.719 8396.57 8466.48 9827.21 32.537 128.114 8419.00 8488.91 9900.00 23.037 113.429 8483.40 8553.31 9917.99 21.000 108.000 8500.08 8569.99 9990.77 21.000 143.000 8568.29 8638.20 9992.60 21.001 143.665 8570.00 8639.91 10000.00 21.033 146.346 8576.91 8646.82 10073.42 23.478 170.902 8645.00 8714.91 10100.00 23.478 170.902 8669.38 8739.29 10134.42 23.478 170.902 8700.95 8770.86 10158.60 25.074 180.130 8723.00 8792.91 10177.49 26.674 186.515 8740.00 8809.91 10200,00 28.909 193.184 8759.92 8829.83 10282.01 39.022 210.579 8828.00 8897.91 10300,00 41.503 213.348 8841.73 8911.64 10325.10 45.063 216.782 8860.00 8929.91 10335.13 46.513 218.037 8867.00 8936.91 10346.95 48.236 219.438 8875.00 8944.91 10386.85 54.168 223.669 8900.00 8969.91 10400.00 56.152 224.923 8907.51 8977.42 10500.00 71.555 232.980 8951.50 9021.41 10600.00 87.240 239.672 8969.87 9039.78 10628.92 91.792 241.530 8970.11 904~.02 10700.00 91.795 241.529 8967.89 9037.80 10800.00 91.799 241.529 8964.75 9034.66 10900.00 91.803 241.528 8961.61 9031.52 11000.00 91.807 241.527 8958.46 9028.37 Sperry-Sun Drilling Services Proposal Report for G-26A WP8 Alaska State Plane Zone 4 PBU_WOA G Pad Local Coordinates H0rthings Eastings (ft) (it) 2278.86 S 3040.29 E 2291.42 S 3050.82 E 2299.56 S 3058.06 E 2327.21S 3085.72 E 2337.10 S 3097.50 E 2354.91S 3126.07 E 2357.31S 3132.37 E 2371.81 ~ 3152.70 E 2372.33 S 3153.09 E 2374.51S 3154.61E 2399.98 $ 3164.25 E 2410.43S 3165.92 E 2423.97 S 3168.09 E 2433.86 S 3168.84 E 2442.07 S 3168.35 E 2452.39 S 3166.53 E 2494.12 S 3148.79 E 2503.98 S 3142,63 E 2518.05 S 3132.74 E 2523.77 S 3128.37 E 2530.54S 3122.93 E 2553.77 S 3102.28 E 2561.49 S 3094.74 E 2619.88 S 3027.05 E 2674.05 S 2945.47 E 2688.24 S 2920.29 E 2722.11 S 2857.83 E 2769.76 S 2769.97 E 2817.41 $ 2682.11E 2865.06 S 2594~25 E Global Coordinates Dogleg Northings Eastings Rate (fi) (fi) (°/100fi) 5966852.76 N 661340.66 E 5966840.42 N 661351.46 E 12.000 5966832.43 N 661358.87 E 12.000 5966805.37 N 661387.10 E 16.000 5966795.73 N 661399.09 E 16.000 5966778.53 N 661428.03 E 16.000 5966776.27-N 661434.38 E 16.000 5966762.20 N 661455.01E 17.000 5966761.68 N 661455.41E 13.000 5966759.54 N 661456.98 E 13.000 5966734.28 N 661467.15 E 13.000 5966723.86 N 661469.04 E 0.000 5966710.37 N 661471.50 E 0.000 5966700.50 N 661472.46 E 17.000 5966692.28 N 661472.14 E 17.000 5966681.92 N 661470.54 E 17.000 5966639.82 N 661453.68 E 17.000 5966629.84 N 661447.73 E 17.000 5966615.57 N 661438.14 E 17.000 5966609.76 N 661433.89 E 17.000 5966602.87 N 661428.59 E 17.000 5966579.22 N 661408.44 E 17.000 5966571.34 N 661401.07 E 17.000 5966511.53 N 661334.62 E 17.000 5966455.65 N 661254.20 E 17.000 5966440.93 N 661229.32 E 17.000 5966405.75 N 661167.60 E 0.004 5966356.26 N 661080.76 E 0.004 5966306.77 N 660993.92 E 0.004 5966257.28 N 660907.08 E 0.004 Vertical Section -450.11 -448.29 -447.40 -446.49 -447.47 -454.31 -456.92 -460.46 -460.35 -459,83 -448.06 -441.65 -433.35 -426.72 -420.43 -411.71 -369.27 -357.89 -340.88 -333.73 -325.07 -294.01 -283.22 -194.25 -98.74 -71.09 -3.47 91.66 186.79 281.92 Comment KOP: Start DIr @ 12.000°/100ft: 9700.00ft MD, 8391.84ft TVD TSHU Dir Rate Increase @ 16.000°/100ft: 9740.00ft MD, 8421.07ft TVD TSAD Dir Rate Increase @ 17.000°/100ft: 9917.99ft MD, 8569.99ft TVD DIr Rate Decrease @ 13.000°/100ft: 9990.77ft MD, 8638.20ft TVD TZ3 End Dir Sail @ 23.478°: 10073.42ft MD, 8714.91ft TVD 'rz2c ' Start DIr @ 17.000°/100ft: 10134.42ft M D, 8770.86ft TVD 23N 24N 21N PGOC TZ1B 14N** 14P** Dir Rate Decrease @ 0.004°/100ft: 10628.92ft MD, 9040.02ft TVD Continued... DrHIQuest 21 July, 1998-16:13 .1. Sperry-Sun Drilling Services Proposal Report for G-26A WP8 Prudhoe Bay Unit Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth N,,o.rthings Eastings (ft) (ft) (ft) (ft) (ft) 11100.00 91.812 241.527 8955.30 9025.21 2912.71 S 2506.39 E 11200.00 91.816 241.526 8952.13 9022.04 2960.36 S 2418.53 E 11267.27 91.819 241.525 8950.00 9019.91 2992.42 S 2359.43 E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) (°/lOOft) (ft) 5966207.79 N 660820.25 E 0.004 377.04 5966158.29 N 660733.41 E 0.004 472.17 5966125.00 N 660675.00 E 0.004 536.16 All data is in feet unless otherwise stated. Directions and coordinates are relatiVe to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Th'e Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 223.657° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11267.27ft., The Bottom Hole Displacement is 3810.70ft., in the Direction of 141.745° (True). Comment Total Depth: 11267.27ft MD, 9019.91ft TVD 4 1/2" Llher Target: G-26A T4, Geological Alaska State Plane Zone 4 PBU_WOA G Pad 21 July, 1998 - 16:13 - 2 - DrlllQuest Sperry-Sun Drillin g Services Proposal Report for G-26A WP8 Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_WOA G Pad Measured Vertical Depth Incl. Azim. Depth Northings Eastings (ft) (ft) (ft) (ft) Vertical Dogleg Section Rate (fl) (°/100ff) 9700.00 40.944 141.118 8391.84 2278.86 S 3040.29 E -450.1'1 9740.00 45.153 137,735 8421.07 2299.56 S 3058.06 E -447.40 12.000 9917.99 21.000 108.000 8569.99 2357.31 S 3132.37 E -456.92 16.000 9990.77 21.000 143.000 8638.20 2371.81 S 3152,70 E -460.46 17.000 10073.42 23.478 170.902 8714.91 2399.98 S 3164.25 E -448.06 13.000 10134.42 23.478 170,902 8770.86 2423.97 S 3168,09 E -433.35 0.000 10628.92 91.792 241.530 9040.02 2688.24 S 2920.29 E -71.09 17.000 11267.27 91.819 241.525 9019.91 2992.42 S 2359.43 E 536.16 0.004 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well, Northings and Eastings are relative to Well, The Dogleg Severity is in Degrees per 100ft, Vertical Section is from Well and calculated along an Azimuth of 223.657° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11267.27ft., The Bottom Hole Displacement is 3810.70ft., in the Direction of 141.745° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings (ft) (ft) (ft) (ft) 9700.00 8391.84 2278.86 S 3040,29 E 9740.00 8421.07 2299.56 S 3058,06 E 9917.99 8569,99 2357,31 S 3132,37 E 9990.77 8638.20 2371.81 S 3152.70 E 10073.42 8714.91 2399.98 S 3164.25 E 10134.42 8770,86 2423.97 S 3168,09 E 10628.92 9040,02 2688.24 S 2920.29 E 11267,27 9019.91 2992,42 S 2359,43 E Comment KOP: Stad Dir @ 12.000°/100ft: 9700.00ft MD, 8391.84ft TVD D~DRate Increase @ 16.000°/100ft: 9740.00ft MD, 8421.07ft Dir Rate Increase @ 17.000°/100ft: 9917.99ft MD, 8569.99ft TVD DT~lrDRate Decrease @ 13.0000/100ft: 9990.77ft MD, 8638.20ft End Dir, Sail @ 23.478°: 10073.42ft MD, 8714.91ft TVD Start Dir @ 17.000°/100ft: 10134.42ft MD, 8770.86ft TVD Dtr Rate Decrease @ 0.004°/10Oft: 10628.92ft MD, 9040.02ft TVD Total Depth: 11267.27ft MD, 9019.91ft TVD Formation Tops Measured Vertical Sub-Sea Depth Depth Depth Northings Eastings Formation Name (ft) (ft) (ft) (ft) (ft) 9724,40 8409.91 8340.00 2291,42 S ' 3050,82 E TSHU 9827,21 8488.91 8419.00 2337.10 S 3097,50 E TSAD 9992.60 8639.91 8570,00 2372.33 S 3153,09 E TZ3 10073,42 8714.91 8645,00 2399,98 S. 3164,25 E TZ2C 10158.60 8792.91 ;'-" 8723,00 2433.86 S 3168.84 E 23N 10177.49 8809.91 8740,00 2442.07 S 3168.35 E 24N 10282.01 8897.91 8828.00 2494.12 S 3148,79 E 21N 10325,10 8929,91 8860,00 2518,05 S 3132.74 E PGOC 10335,13 8936,91 8867.00 2523.77 S 3128.37 E TZ1B 10346,95 8944.91 8875,00 2530,64 S 3122.93 E 14N** 10386.85 8969,91 8900.00 2553.77 S 3102,28 E 14P*' Casing details From Measured Vertical Depth Depth (ft) (ft) <Sudace> <Surface> To Measured Vertical Depth Depth (ft) (ft) <Run-TD> <Run-TD> Casing Detail 4 1/2' Liner Continued... 21 July, 1998.16:13 - 1 - OrillQuest STATE OF ALASKA ALASKA O~-c'AND GAS CONSERVATION COMf~¢iSSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging E] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [~ Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. 'Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. [] Development KBE = 72.41' [ Exploratory 7. Unit or Property Name 3. Address [~Stratigraphic Prudhoe Bay Unit P.O. Box 196612, Anchorage, Alaska 99519-6612 []Service .... 4. Location of well at surface 8. Well Number G-26 2583' SNL, 1974' WEL, SEC. 12, T11N, R13E, UM 9. Permit Number At top of productive interval 86-171 355' NSL, 1119' EWL, SEC. 07, T11N, R14E, UM '10. APl Number At effective depth 50-029-21661 11' SNL, 1407' EWL, SEC. 18, T11N, R14E, UM 11. Field and Pool At total depth Prudhoe Bay Field / Prudhoe Bev 50' SNL, 1436' EWL, SEC. 18, T11N, R14E, UM Pool D [~ (" ~ I ~-/-1~' I\ L... '~.,, I- I 12. Present well condition summary Total depth: measured 10650 feet Plugs (measured)JUL 2 2: 998 true vertical 9129 feet Effective depth: measured 10570 feet Junk (measured) Fill at 10570' MD (06/89) true vertical 9066 feet &laska 0il & 6as Cons, Corn Anchorage Casing Length Size Cemented MD TVD Structural Conductor 110' 20" 9 cu yds concrete 145' 145' Surface 2654' 13-3/8" 3258 cu ft PF 'E', 465 cu ft PF 2689' 2689' Intermediate 9623' 9-5/8" 575 cu ft Class 'G' 9658' 8360' Production 1266' 7" 403 cuft Class 'G' 9382' - 10648' 8150' - 9128' Liner Perforation depth: measured 10412' - 10417', 10460' - 10480', 10480' - 10500', 10500' - 10520', 10520' ~ 10536' true vertical subsea 8867' - 8968' (five intervals) Tubing (size, grade, and measured depth) 4-1/2", L-80 to 9313' with 4-1/2" tailpipe to 9419' Packers and SSSV (type and measured depth) 9-5/8" TIW packer at 9313'; 4-1/2" SSSV at 2049' 13. Attachments [] Description summary of proposal ~] Detailed operations program [~ BOP sketch 14. Estimated date for commencing operation 15. Status of well classifications as: July 30, 1998 16. If proposal was verbally approved [] Oil E~ Gas [~ Suspended Service Name of approver Date approved Contact Engineer Name/Number: Bob Kaluza, 564-5344 Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is true and correct to the best' of my knowledge Signed Dan Stone Title Engineering Supervisor Date Commission Use Only Conditions of Approval: Notify Commission so representative may witness J Approval ~)~o,4e& Oo~ Plug integrity ~ BOP Test ~ Location clearance__ ,~,~~, · ~,pp¢~rder of the Commission navid W..Inhnqfn, Commissioner Date Pd~rm 1¢403 Rev. 06/15/88 ......... Submit In T~plic~te 9/23/98 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 AI-I'N: Sherrle NO. 11506 Company: Field: Alaska Oil & Gas Cons Corem Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Prudhoe Bay (Cased Hole) Well Job # Log Description Date BL RF Sepia LIS Tape G-21 PRODUCTION PROFILE 980 906 I 1 G-26A RFT 980905 1 1 J-22 STATIC SURVEYS 980 91 8 1 1 M-08 PRODUCTION PROFILE, GLS 980 83 0 1 1 M-08 GHOST/PSP 9 80831 I 1 M-08 PROD. PROFILE W/DEFT & GHOST 980831 I 1 M-08 DEFT IMAGES 980 831 1 I , , M- 34 PRODUCTION PROFILE 9 80819 I 1 M-34 DEFT 980819 I 1 N-9 N-9 980913 I 1 N- 14A PRODUCTION PROFILE 980826 1 1 W-03A INJECTION PROFILE 980904 1 1 X-01 '79. O 7- 5f PRODUCTION LOG,STATIC PRESS/TEMP 98091 0 I I ...... X-04 PRODUCTION LOG,STATIC PRESS/TEMP 980910 I 1 Z-08A GAS LIFT SURVEY 980919 1 1 Z-08A PRODUCTION PROFILE 980919 I I q'7. PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: RECEIVED SEP 24 1998 ~ncherage Schlumberger GeoQuest 500 W. International Airport Road Anchorage. Alaska 99618-1199 Received MEMORANDUM TO' State of Alaska Alaska Oil and Gas Conservation Commission David Johns~~ DATE: 9/14/98 Chairman ~' THRU' Blair Wondzell, ~ P. I. Supervisor ¢/c°Jge FROM' Larry Wad ~,e?~~ SUBJECT: Petroleum Ihspeclibr FILE NO' .DOC BOP Test Doyon 14 PBU G-26A PTD 98-151 September 6,1998: I traveled to PBU G pad to witness a BOP test on Doyon 14. The test went well with no suprises with the rig looking in good shape because of a lot of fresh paint. SUMMARY: I witnessed a BOP test on Doyon 14, 3.5 hrs,0 failures. Attachments: ahggiffe.xls cc; NON-CONFIDENTIAL STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Workover: Drlg Contractor: Doyon Operator: SSD Well Name: G-26A Casing Size: 7" Set @ Test: Initial Weekly Rig No. 14 PTD # Rep.: Rig Rep.: 10, 648 Location: Sec. X Other 98-151 DATE: 9/6/98 Rig Ph.# 659-45?0 Dennis A ckerman Mark Egholrn 12 T. 11N R. 13E Meridian Test Pressures 250/3000 TESTDATA i : i:; ::: MISC. INSPECTIONS: Location Gen.: ok Housekeeping: ok (Gen) PTD On Location X Standing Order Posted X BOP STACK: Quan. Annular Preventer Pipe Rams '/ Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves 2 Kill Line Valves Check Valve Well Sign Drl, Rig Hazard Sec. X X X Test Press. 250/3000 250/3000 250/3000 250/3000 250/3000 250/3000 FLOOR SAFETY VALVES: Upper Kelly/IBOP Lower Kelly/IBOP Ball Type Inside BOP 250/3000 P/F P CHOKE MANIFOLD: P No. Valves P No. Flanges P Manual Chokes P Hydraulic Chokes P P Test Quart. Pressure P/F 1 250/3000 P I 250/3000 P 1 250/3000 P 1 250/3000 P Test Pressure P/F 13 250/3000 P 26 250/3000 P Func~oned Functioned ACCUMULATOR SYSTEM: System Pressure 3, 025 Pressure After Closure 1,800 MUD SYSTEM: Visual Alarm 200 psi Attained After Closure minutes 35 sec. Trip Tank X X System Pressure Attained 2 minutes 40 sec. Pit Level Indicators X .X' Blind Switch Covers: Master: x Remote: x Flow Indicator X X Nitgn. Btl's: 2400-2400-2400-2400 Meth Gas Detector X X Psig. H2S Gas Detector X' X' TEST'RESULTS ::' ::: Number of Failures: 0 ,Test Time: 3.5 Hours. NumDer of valves tested '/9 Repair or Replacement of Failed Equipment will be made within days. Notify the Inspector and follow with Written or Faxed verification to the AOGGC Commission office at: Fax NO. 276.7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Distribution: Grig-Well File c- Oper./Rig c- Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: Larry Wade FI-021L (Rev. 12/94) Ahggiffe.xls 06/03/c28 001387c24 VENDOR ........ C"tM ~,,~r,.f-t,.,~ ! .t ,w- t,,,J' DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET O&O 198 CKO&O 198F 100. O0 100. O0 HANDL NQ INST: S/H TERRIE HUBBL]~ X 4&28 rilE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. /~[~]~r--~l~ ~ .~ ,,"~,,'~ ,,'~,,',. ..... · WELL PERMIT CHECKLIST COMPANY WELL NAME ~ PROGRAM: exp [] dev'~/redrll~serv [] wellbore seg II ann. disposal para req II FIELD & POOL~ ADMINISTRATION II APPR DATE Dp, TE INIT CLASS~,~~~:2~ 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... GF:OLOGY 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. GEOL AREA ~"'~,~::> UNIT# ///)~/~'. ¢',¢2 Y N N N N N N N N N N N N N Conductor string provided ................... Surface casing protects all known USDWs ........... CMT vol adequate to circulate on conductor & surf csg ..... CMT vol adequate to tie-in long string to surf csg ........ CMT will cover all known productive horizons .......... Casing designs adequate for C, T, B & permafrost ....... Adequate tankage or reserve pit ................. If a re-drill, has a l~.~3_J.or__abandonment been approved... Adequate wellbore separation proposed ............. If diverter required, does it meet regulations .......... Drilling fluid program schematic & equip list adequate ..... 30. 31. 32. 33. 34. BOPEs, do they meet regulation .............. : - BOPE press rating appropriate; test to ,~~ ps~g. Choke manifold complies w/APl RP-53 (May 84) ........ Work will occur without operation shutdown ........... Is presence of H2S gas probable ................. Permit can be issued w/o hydrogen sulfide measures ..... Y Data presented on potential overpressure zones ....... Y/N' Seismic analysis of shallow gas zones ............. ,,Y"" N Seabed condition survey (if off-shore) ............. /" Y N Contact name/phone for weekly progress reports ....... ../ Y N [exploratory only] Y N (C) will not impair mechanical inte~.g.dl~fthe well used for d~sposal; Y N (D) will not damage pro~..d._u..cir~gd'brmation or impair recovery from a Y pool; and j ~p.Lc4rd. umvent 20 AAC 25.252 or 20 AAC 25.412. Y N ANNULAR DISPOSAL 35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ....... APPR DATE (B) will not contaminate freshwater; or cause drilling.wa~e... to sudace; .......... ON/OFF SHORE GEOLOGY: RPC bl~_ ,~¢NGINEE~RING: UIC/Annular COMMON:. . ' · RNC -------'~ co CO Comments/Instructions: V~:chel~list rev 05129198 dlf': C :\rnsoffico\wordiar~\diana\chockli,"q Well History File APPENDIX Information of detailed nature that is not padicularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER * ............................ * COMPANY NAME : BP EXPLORATION WELL NAME : G-2 6A FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292166101 REFERENCE NO : 9864 6 RECEIVED JAN 2 i 1999 Alaska Oil 8, (2as Cons. Commission An~orage LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-19~3~i 4 : 54 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 99/01/18 ORIGIN : FLIC REEL NAME : 98646 CONTINUATION # : PREVIOUS REEL : CO~4MENT : BP EXPLORATION, G-26A, PRUDHOE BAY, API #50-029-21661-01 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 99/01/18 ORIGIN : FLIC TAPE NAME : 98646 CONTINUATION # : 1 PREVIOUS TAPE : CO~k4ENT : BP EXPLORATION, G-26A, PRUDHOE BAY, API #50-029-21661-01 TAPE HEADER PR UDHOE BAY OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION RUN 1 98646 D. KIRKB Y HA YW O OD SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL : ELEVATION(FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING G-26A 500292166101 BP EXPLORATION SCHLUMBERGER WELL SERVICES 18-JAN-99 RUN 2 RUN 3 12 liN 13E 2583 1974 74.57 73.07 34.60 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.000 7.000 9702.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-19~'~14 : 54 3RD STRING PRODUCTION STRING REMARKS: CONTAINED HEREIN IS THE OPEN-HOLE PEX/BHC/HALS DATA ACQUIRED ON BP EXPLORATION WELL G-26A ON 2-SEP-98. NO DEPTH SHIFTS WERE APPLIED TO THIS DATA AS IT IS THE PRIMARY DEPTH CONTROL DATA AS PER TRACY LOVE 12-JAN-99. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE · 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE '. FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS Ail tool strings; Depth shifted and clipped curves; all runs merged; no cased hole data. DEPTH INCREMENT: O. 5000 FILE SUN~IARY LDWG TOOL CODE BCS CNT SDN DLL $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 10965.0 9710.0 10992.0 9710.0 11007.0 9710.0 11020.0 9710.0 BASELINE DEPTH $ MERGED DATA SOURCE LDWG TOOL CODE $ REMARKS: THIS FILE CONTAINS THE CLIPPED BCS/CNT/SDN/DLL DATA FOR THE MAIN PASS. ONLY VALID OPEN-HOLE DATA IS PRE- SENTED IN THIS FILE. NO DEPTH SHIFTS WERE APPLIED TO THIS DATA AS IT IS THE PRIMARY DEPTH CONTROL DATA. $ .......... EQUIVALENT UNSHIFTED DEPTH BCS CNT SDN DLL RUN NO. PASS NO. MERGE TOP MERGE BASE LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 18 -JAN-19~'~i 4: 54 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 100 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 10 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 6037491 O0 000 O0 0 ! 1 1 4 68 0000000000 GR CNT GAPI 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CNT LB 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 TEND CNT LB 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 MRES CNT O~ 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 MTEM CNT DEGF 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 DEV CNT DEG 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNT CPS 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNT CPS 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNT CPS 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNT CPS 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNT 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNT 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI C~T PU-S 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 CPHI CNT PU-S 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 DT BCS US/F 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 CALl SDN IN 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 DRHO SDN G/C3 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 PEF SDN BN/E 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 RHOB SDN G/C3 6037491 O0 000 O0 0 ! 1 1 4 68 0000000000 MSFL SDN OH~4M 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 MINV SDN OHP94 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 MNOR SDN OPH~I 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 LLD DLL OP~V~l6037491 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-19~-~i 4 : 54 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) LLS DLL OH~ff4 6037491 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 11030.000 GR.CNT -999.250 TENS. CNT 1936.000 TEND. CNT MRES.CNT -999.250 MTEM. CNT -999.250 DEV. CNT -999.250 CNTC. CNT CFTC. CNT -999. 250 FCNT. CNT -999. 250 NCNT. CNT -999. 250 CRAT. CNT NRAT. CNT -999. 250 NPHI. CNT -999. 250 CPHI. CNT -999. 250 DT. BCS CALl .SDN -999.250 DRHO.SDN -999.250 PEF. SDN -999.250 RHOB.SDN MSFL.SDN -999.250 MINV. SDN -999.250 MNOR.SDN -999.250 LLD.DLL LLS. DLL - 999.250 DEPT. 9710. 000 GR. CNT 82. 386 TENS. CNT MRES. CNT 0.030 MTEM. CNT 168.355 DEV. CNT CFTC. CNT 1068. 232 FCNT. CNT 994. 821 NCNT. CNT NRAT. CNT 2. 549 NPHI. CNT 28. 136 CPHI. CArT CAL1.SDN 5.878 DRHO.SDN 0.019 PEF. SDN MSFL.SDN 1.895 MINV. SDN 1.574 ~4NOR.SDN LLS. DLL 1 . 558 1167 000 43 265 2600 990 27 335 2 571 1 238 TEND. CNT CNTC. CNT CRAT. CNT DT. BCS RHOB. SDN LLD. DLL -1408.500 -999.250 -999.250 -999.250 -999.250 -999.250 960.984 2559.996 2.442 56.774 2.334 1.165 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE · FLIC VERSION : O01CO1 DATE . 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-19~ 4 : 54 PAGE: EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SU~E4ARY LDWG TOOL CODE START DEPTH CNT 9710.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) STOP DEPTH 9676.0 BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH CNT REMARKS: THIS FILE CONTAINS THE CLIPPED CNTDATA FOR THE MAIN PASS RUN UP INTO CASING. ONLY VALID CASED-HOLE DATA IS PRESENTED IN THIS FILE. NO DEPTH SHIFTS WERE APPLIED TO THIS DATA AS IT IS THE PRIMARY DEPTH CONTROL DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 48 4 66 1 $ 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 21 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-19~r~ 4 :54 PAGE .. ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (H~) DEPT FT 6037491 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CNT LB 6037491 O0 000 O0 0 2 1 1 4 68 0000000000 TEND CNT LB 6037491 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNT GAPI 6037491 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNT CPS 6037491 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNT CPS 6037491 O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNT CPS 6037491 O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNT CPS 6037491 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNT 6037491 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNT 6037491 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNT PU-S 6037491 O0 000 O0 0 2 1 1 4 68 0000000000 CPHI CNT PU-S 6037491 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 9710.000 TENS. CNT 1167.000 TEND.CNT 960.984 GRCH. CNT CNTC. CNT 2559.996 CFTC. CNT 1068.232 FCNT.CNT 994.821 NCNT. CNT CRAT. CNT 2.442 NRAT. CNT 2.549 NPHI.CNT 28.136 CPHI.CNT DEPT. 9676.000 TENS.CNT 1169.000 TEND.CNT 990.001 GRCH. CNT CNTC.CNT 1207.470 CFTC. CNT 321.648 FCNT. CNT 308.851 NCNT. CNT CRAT. CNT 3.800 NRAT. CNT 3.821 NPHI.CNT 51.542 CPHI.CNT 82.386 2600.990 27.335 95.412 1199.065 48.520 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION : O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE · FLIC VERSION · O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-19~ 4 : 54 PAGE: 7 FILE HEADER FILE NUMBER 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SU~gffARY VENDOR TOOL CODE START DEPTH BHC 11031.5 PEX 11031.5 HALS 11031.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH 9710.0 9710.0 9710.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SONDE PEX PLATFORM EXPRESS $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): ~IMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~M) AT TE~IPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : 2-SEP-98 8Cl-205 430 2-SEP-98 2200 2-SEP-98 11666.0 11032.0 9710.0 10965.0 1800.0 TOOL NUMBER DTC-H AMS-A HILTB-FTB 6. 000 9702.0 9710.0 QUIKDRIL-N 8.80 56.0 8.9 185.0 O. 120 74.0 O. 116 70.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: MUD CAKE AT (MT): MUD CAKE AT (BHT) : 0.122 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): O. 5 REMARKS: Depth is based on driller's pipe tally as per request of wellsite geologist Harry Haywood (these logs were not tied into any other logs as requested). Logs are 7 feet shallower than MWD logs. Logs are 2 feet shallower than BHC Sonic log of 14-Nov-86 on G-26 when comparing the Sag River. Down log data on sonic log only. Standoffs run on HALS and BHC Sonic. First run PEX-SONIC, Second run RFT~ Horizontal well - tools run on drill pipe with TLC gear. Down log stopped at 11030' due to high compressional forces. 3 stand repeat run below bottom of window. Bottom of window used as casing depth on header. THIS FILE CONTAINS THE RAWMAIN PASS OPEN HOLE PEX/BHC/HALS DATA PRESENTED AT 0.5' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 136 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 7 12 68 13 66 0 14 65 FT 15 66 68 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18- JAN- 19~'~-i 4: 54 PAGE: TYPE REPR CODE VALUE 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~I CODE (HEX) DEPT FT 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 GR PEX GAPI 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 TENS PEX LB 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 HTEN PEX LB 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 MRES PEX OH~4~I6037491 O0 000 O0 0 3 1 1 4 68 0000000000 MTEMPEX DEGF 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 GDEV PEX DEG 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC PEX CPS 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC PEX CPS 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 RCFT PEX CPS 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 RCNT PEX CPS 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 TNRA PEX 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 RTNR PEX 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 TNPH PEX PU 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 NPHI PEX PU 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 NPOR PEX PU 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 DT BHC US/F 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 TT1 BHC US 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 TT2 BHC US 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 TT3 BHC US 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 TT4 BHC US 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 HCAL PEX IN 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 RHOZ PEX G/C3 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 HDRA PEX G/C3 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 PEFZ PEX 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 DPHZ PEX PU 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 H~4INPEX OHdVk46037491 O0 000 O0 0 3 1 1 4 68 0000000000 HlviNO PEX OHMM 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 RXOZ PEX OH~ff46037491 O0 000 O0 0 3 1 1 4 68 0000000000 RX08 PEX Ott~I 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 HLLD HALS 0H~94 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 HLLS HALS OH~Zk46037491 O0 000 O0 0 3 1 1 4 68 0000000000 HRLDHALS OH~k4 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 HRLSHALS OH~4 6037491 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 11031.500 GR.PEX 128.871 TENS.PEX 1486.000 HTEN. PEX MRES.PEX 0.030 MTEM. PEX 185.119 GDEV. PEX -999.250 CNTC. PEX CFTC. PEX 960.209 RCFT. PEX 875.371 RCNT. PEX 2473.111 TNRA.PEX RTNR.PEX 2.836 TNPH. PEX 31.804 NPHI.PEX 33.567 NPOR.PEX -1408.500 2573.174 2. 734 31.306 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18 -JAN-19~14: 54 PAGE: 10 DT. BHC 98.066 TT1.BHC TT4.BHC 357.891 HCAL.PEX PEFZ.PEX -999.250 DPHZ.PEX RXOZ.PEX 1.108 RXO8.PEX HRLD.HALS 266.023 HRLS.HALS DEPT. 9710.000 GR.PEX MRES.PEX 0.030 MTE~.PEX CFTC. PEX 1068.232 RCFT. PEX RTNR.PEX 2.549 TNPH. PEX DT. BHC 56.774 TT1.BHC TT4.BHC 388.906 HCAL.PEX PEFZ.PEX 2.571 DPHZ.PEX RXOZ.PEX 1.895 RXO8.PEX HRLD.HALS 1.181 HRLS.HALS 561. 4. 60721. 1. 53700. 82. 168. 994. 27. 435. 5. 19. 1. 1. 016 TT2.BHC 335.859 TT3.BHC 771 RHOZ.PEX -999.250 HDRA. PEX 211 H~IN. PEX 0.143 H~fNO.PEX 114 HLLD.HALS 1654.781 HLLS.HALS 000 386 TENS. PEX 355 GDEV. PEX 821 RCNT. PEX 335 NPHI.PEX 625 TT2.BHC 878 RHOZ.PEX 126 H~IN. PEX 954 HLLD.~S 634 1167.000 HTEN. PEX 43.265 CNTC. PEX 2600.990 TArRA.PEX 28.136 NPOR.PEX 348.750 TT3.BHC 2.334 HDRA.PEX 1.574 H~INO.PEX 1.165 HLLS.HALS 525.000 -999.250 0.185 5070.590 960.984 2559.996 2.442 24.972 444.121 0.019 1.238 1.558 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE AtUMBER 4 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Eadler interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: O. 1667 FILE S~Y LIS Tape Verification Listing Schlumberger Alaska Computing Center 18 -JAN-19~14: 54 PAGE: 11 VENDOR TOOL CODE START DEPTH BHC 11031.5 PEX 11031.5 HALS 11031.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : STOP DEPTH 9710.0 9710.0 9710.0 TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SONDE PEX PLATFORM ED~PRESS $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3) MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THE~): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) 2-SEP-98 8Cl -205 430 2-SEP-98 2200 2-SEP-98 11666.0 11032.0 9710.0 10965.0 1800.0 TOOL NUMBER DTC-H AMS- A HILTB-FTB 6. 000 9702.0 9710.0 QUIKDRIL-N 8.80 56.0 8.9 185.0 0. 120 74.0 0.116 70.0 0.122 70.0 THE~ SANDSTONE 2.65 0.5 REMARKS: Depth is based on driller's pipe tally as per LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-199~14 : 54 PAGE: 12 request of wellsite geologist Harry Haywood (these logs were not tied into any other logs as requested). Logs are 7 feet shallower than MWD logs. Logs are 2 feet shallower than BHC Sonic log of 14-Nov-86 on G-26 when comparing the Sag River. Down log data on sonic log only. Standoffs run on HALS and BHC Sonic. First run PEX-SONIC, Second run RFT. Horizontal well - tools run on drill pipe with TLC gear. Down log stopped at 11030' due to high compressional forces. 3 stand repeat run below bottom of window. Bottom of window used as casing depth on header. THIS FILE CONTAINS THE RAW MAIN PASS OPEN HOLE PEX/BHC/HALS DATA ACQUIRED AT .1667' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 2 3 4 5 6 73 7 65 8 68 9 65 11 66 12 68 13 66 14 65 15 66 16 66 0 66 66 0 66 0 73 96 66 1 66 0.166 FT 10 0 FT 68 1 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 RHOZ PEX G/C3 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 HDRA PEX G/C3 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18 -JAN-19~9~"~ 4: 54 PAGE: 13 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) PEFZ PEX 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 DPHZ PEX PU 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 H~qIN PEX OH~q 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 HMNO PEX OH~ 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 RXOZ PEX OHl~q 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 RX08 PEX OHI4~ 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 HCNT PEX CPS 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 HCFT PEX CPS 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 HGR PEX GAPI 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 RHFT PEX CPS 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 RHNT PEX CPS 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 HTNP PEX PU 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 HNPO PEX PU 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 TT1 BHC US 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 TT2 BHC US 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 TT3 BHC US 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 TT4 BHC US 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 HLLD HALS OH~q 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 HLLS HALS OH~B~ 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 HRLD HALS OtP4~ 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 HRLS HALS OPY~q 6037491 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 11031.500 RHOZ.PEX -999.250 HDRA.P~ -999.250 PEFZ.PEX DPHZ.PEX 60721.211 HIqIN. PEX 0.143 H~INO.PEX 0.185 RXOZ.PEX RDCO8.PEX 1.114 HCNT. PEX 2573.174 HCFT. PEX 960.209 HGR.PEX RHFT. PEX 875.371 RHNT. PEX 2473.111 HTNP.PEX 31.804 HNPO.PEX TT1.BHC 561.016 TT2.BHC 335.859 TT3.BHC 525.000 TT4.BHC HLLD.HALS 1654.781 HLLS.HALS 5070.590 HRLD.HALS 266.023 HRLS.HALS -999.250 1.108 128.871 31.306 357.891 53700.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE · FLIC VERSION : O01CO1 DATE · 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 18 -JAN-19 ~14 : 5 4 PAGE: 14 **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE · FLIC VERSION : O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUNmlARY FILE HEADER FILE NUMBER 5 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 1 0.0833 VENDOR TOOL CODE START DEPTH STOP DEPTH BHC 11031.5 9710.0 PEX 11031.5 9710.0 HALS 11031.5 9710.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION EArDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SONDE PEX PLATFORM EXPRESS $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 2 -SEP-98 8Cl -205 430 2-SEP-98 2200 2-SEP-98 11666.0 11032.0 9710.0 10965.0 1800.0 TOOL NUMBER DTC-H AMS-A HIL TB - FTB 6.000 9702.0 9710.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-19~9~14 : 5 4 PAGE: 15 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) RESISTIVITY (OH~ff4) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) MUD AT BOTTOM HOLE TEMPERATURE (BHT) MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : QUIKDRIL-N 8.80 56.0 8.9 185.0 0.120 0.116 O. 122 74.0 70.0 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): O. 5 REMARKS: Depth is based on driller's pipe tally as per request of wellsite geologist Harry Haywood (these logs were not tied into any other logs as requested). Logs are 7 feet shallower than MWD logs. Logs are 2 feet shallower than BHC Sonic log of 14-Nov-86 on G-26 when comparing the Sag River. Do~m log data on sonic log only. Standoffs run on HALS and BHC Sonic. First run PEX-SONIC, Second run RFT. Horizontal well - tools run on drill pipe with TLC gear. Do~nu log stopped at 11030' due to high compressional forces. 3 stand repeat run below bottom of window. Bottom of window used as casing depth on header. THIS FILE CONTAINS THE RAW MAIN PASS OPEN HOLE PEX/BHC/HALS DATA ACQUIRED AT .0833' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-199~ ~4: 54 PAGE: 16 TYPE REPR CODE VALUE 3 73 8 4 66 1 5 66 6 73 7 65 8 68 0.083 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUNi~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 6037491 O0 000 O0 0 5 1 1 4 68 0000000000 HCAL PEX IN 6037491 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 11031.500 HCAL.PEX 4.771 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION · O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-19~-~ ~ 4 : 54 PAGE: 17 **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE · FLIC VERSION : O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUPff4ARY VENDOR TOOL CODE START DEPTH BHC 9960.0 PEX 9960.0 HALS 9960.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SONDE PEX PLATFORM EXPRESS BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: STOP DEPTH 9710.0 9710.0 9710.0 2-SEP-98 8Cl-205 430 2-SEP-98 2200 2-SEP-98 11666.0 11032.0 9710.0 10965.0 1800.0 TOOL NUMBER DTC-H AMS-A HILTB - FTB 6.000 9702.0 9710.0 QUIKDRIL -N LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-195~ i4:54 PAGE: 18 MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S) : 56.0 MUD PH: 8.9 FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : 185.0 RESISTIVITY (OH~k4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 0.120 MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): 0.116 MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): O. 122 MUD CAKE AT (BHT) : 74.0 70.0 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.0 REMARKS: Depth is based on driller's pipe tally as per request of wellsite geologist Harry Haywood (these logs were not tied into any other logs as requested). Logs are 7 feet shallower than MWD logs. Logs are 2 feet shallower than BHC Sonic log of 14-Nov-86 on G-26 when comparing the Sag River. Down log data on sonic log only. Standoffs run on HALS and BHC Sonic. First run PEX-SONIC, Second run RFT. Horizontal well - tools run on drill pipe with TLC gear. Down log stopped at 11030' due to high compressional forces. 3 stand repeat run below bottom of window. Bottom of window used as casing depth on header. THIS FILE CONTAINS THE RAW REPEAT PASS OPEN HOLE PEX/BHC/HALS DATA ACQUIRED AT .5' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 68 4 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-199~ i4:54 PAGE: 19 TYPE REPR CODE VALUE 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 15 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NY3M~ SAMP ELEM CODE (HE~) DEPT FT 6037491 O0 000 O0 0 6 1 1 4 68 0000000000 GR PEX GAPI 6037491 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PEX LB 6037491 O0 000 O0 0 6 1 1 4 68 0000000000 HTEN PEX LB 6037491 O0 000 O0 0 6 1 1 4 68 0000000000 MRES PEX OHN~I 6037491 O0 000 O0 0 6 1 1 4 68 0000000000 MTEM PEX DEGF 6037491 O0 000 O0 0 6 1 1 4 68 0000000000 GDEV PEX DEG 6037491 O0 000 O0 0 6 t 1 4 68 0000000000 CNTC PEX CPS 6037491 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PEX CPS 6037491 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PEX CPS 6037491 O0 000 O0 0 6 1 1 4 68 0000000000 RCNT PEX CPS 6037491 O0 000 O0 0 6 1 1 4 68 0000000000 TNRA PEX 6037491 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PEX 6037491 O0 000 O0 0 6 1 1 4 68 0000000000 TNPH PEX PU 6037491 O0 000 O0 0 6 1 1 4 68 0000000000 NPHI PEX PU 6037491 O0 000 O0 0 6 1 1 4 68 0000000000 NPOR PEX PU 6037491 O0 000 O0 0 6 1 1 4 68 0000000000 DT BHC US/F 6037491 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 9960.000 GR,PEX 79.632 TENS.PEX 813.000 HTEN. PEX MRES.PEX 0.029 MTEM, PEX 168.440 GDEV. PEX -999.250 CNTC. PEX CFTC. PEX 1986.006 RCFT. PEX 1782.172 RCNT. PEX 3634.295 TNRA.PEX RTNR.PEX 2.016 TNPH. PF~ 19.884 NPHI.PEX 20.709 NPOR.PEX DT.BHC 87.891 807.079 3796.851 1.943 19.630 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-19~ 4 : 54 PAGE: 2O **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUMBER 7 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, a~d run in separate files. 1 1 2 0.1667 VENDOR TOOL CODE START DEPTH STOP DEPTH BHC 9960.0 9710.0 PEX 9960.0 9710.0 HALS 9960.0 9710.0 $ LOG HEADER DATA DATE LOGGED: SOF~gARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SONDE 2-SEP-98 8Cl -205 430 2-SEP-98 2200 2-SEP-98 11666.0 11032.0 9710.0 10965.0 1800.0 TOOL NIIMBER DTC-H AMS - A LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-19~-~i 4 : 54 PAGE: 21 PEX $ PLATFORM EXPRESS BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : HIL TB - FTB 6.000 9702.0 9710.0 BOREHOLE CONDITIONS MUD TYPE: QUIKDRIL-N MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S) : 56.0 MUD PH: 8.9 FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : 185.0 RESISTIVITY (OB?4M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): O. 120 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): 0.116 MIlD FILTRATE AT (BHT) : MUD CAKE AT (MT): O. 122 MUD CAKE AT (BHT) : 74.0 70.0 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THE~ SANDSTONE 2.65 TOOL STANDOFF (IN): 1.0 REMARKS: Depth is based on driller's pipe tally as per request of wellsite geologist Harry Haywood (these logs were not tied into any other logs as requested). Logs are 7 feet shallower than MWD logs. Logs are 2 feet shallower than BHC Sonic log of 14-Nov-86 on G-26 when comparing the Sag River. Down log data on sonic log only. Standoffs run on HALS and BHC Sonic. First run PEX-SONIC, Second run RFT. Horizontal well - tools run on drill pipe with TLC gear. Down log stopped at 11030' due to high compressional forces. 3 stand repeat run belo~J bottom of window. Bottom of window used as casing depth on header. THIS FILE CONTAINS THE RAW REPEAT PASS OPEN HOLE PEX/BHC/HALS DATA ACQUIRED AT .1667' SAMPLE RATE. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-19~14 : 54 PAGE: 22 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 96 4 66 1 5 66 6 73 7 65 8 68 O. 166 9 65 FT 11 66 10 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 RHOZ PEX G/C3 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 HDRA PEX G/C3 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 PEFZ PEX 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 DPHZ PEX PU 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 t4MINPEX OH~ff46037491 O0 000 O0 0 7 1 1 4 68 0000000000 H~4NOPEX OHMM 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 RXOZ PEX OPB¢~46037491 O0 000 O0 0 7 1 1 4 68 0000000000 R~08 PEX OP~ff46037491 O0 000 O0 0 7 1 1 4 68 0000000000 HCNT PEX CPS 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 HCFT PEX CPS 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 HGR PEX GAPI 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 RHFT PEX CPS 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 RHNT PEX CPS 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 HTNP PEX PU 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 HNPO PEX PU 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 TT1 BHC US 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 TT2 BHC US 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 TT3 BHC US 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 TT4 BHC US 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 HLLD HALS OHM~ 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 HLLS HALS OH~4M 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 HRLD HALS OHIdk46037491 O0 000 O0 0 7 1 1 4 68 0000000000 HRLS HALS 0H~94 6037491 O0 000 O0 0 7 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-19'~14 : 54 PAGE: 23 ** DATA ** DEPT. 9960.000 RHOZ.PEX -999.250 HDRA.PEX DPHZ.PEX 60721.211 HMIN. PEX 0.864 HMNO.PEX RXO8.PEX 1.807 HCNT. PEX 3796.852 HCFT. PEX RHFT. PEX 1782.172 RHNT. PEX 3634.295 HTNP.PEX TT1.BHC 558.359 TT2.BHC 384.219 TT3.BHC HLLD.HALS 60000.000 HLLS.HALS 60000.000 HRLD.HALS -999.250 PEFZ.PEX 0.583 RXOZ.PEX 1986.006 HGR.PEX 19.884 HNPO.PEX 533.281 TT4.BHC 45000.000 HRLS.HALS -999.250 1.811 79.632 19.630 355.859 19801.039 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION · O01CO1 DATE ' 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 8 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 2 DEPTH INCREMENT: O. 0833 FILE SUPmlARY VENDOR TOOL CODE START DEPTH BHC 9960.0 PEX 9960.0 PiA~S 9960.0 $ LOG HEADER DATA DATE LOGGED: STOP DEPTH 9710.0 9710.0 9710.0 2-SEP~98 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-199~ 4 : 54 PAGE: 24 SOFTWARE VERSION: TIME CIRCULATION ENDED TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) LOGGING SPEED (FPHR) : 8Cl -205 430 2200 11666.0 11032.0 9710.0 10965.0 1800.0 2-SEP-98 2-SEP-98 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SONDE PEX PLATFORM EXPRESS $ TOOL NUMBER ........... DTC-H AMS-A HILTB-FTB BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): 6. 000 9702.0 9710.0 BOREHOLE CONDITIONS MUD TYPE: QUIKDRIL-N MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S) : 56.0 MUD PH : 8.9 FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): 185.0 RESISTIVITY (OPH~4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 0.120 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): O. 116 MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): O. 122 MUD CAKE AT (BHT): 74.0 70.0 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.0 REMARKS: Depth is based on driller's pipe tally as per request of wellsite geologist Harry Hay~ood (these logs were not tied into any other logs as requested). Logs are 7 feet shallower than MWD logs. Logs are 2 feet shallower than BHC Sonic log of 14-Nov-86 on G-26 when comparing the Sag River. Do~m log data on sonic log only. Standoffs run on HALS and BHC Sonic. First run PEX-SONIC, Second ruun RFT. Horizontal well - tools run on drill pipe with LIS Ta~ 'Verification Listing Schlumberger Alaska Computing Center 18-JAN-199J' 14:54 PAGE: 25 TLC gear. Down log stopped at 11030' due to high compressional forces. 3 stand repeat run below bottom of window. Bottom of window used as casing depth on header. THIS FILE CONTAINS THE RAW REPEAT PASS OPEN HOLE PEX/BHC/HALS DATA ACQUIRED AT .0833' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 1 5 66 6 73 7 65 8 68 0.083 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 6037491 O0 000 O0 0 8 1 1 4 68 0000000000 HCAL PEX IN 6037491 O0 000 O0 0 8 1 1 4 68 0000000000 ** DATA ** DEPT. 9960.000 HCAL.PEX 5.817 ** END OF DATA ** LIS Tape~ Verification Listing Schlumberger Alaska Computing Center 18 -JAN-19~=Jl 4: 54 PAGE: 26 **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 9 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE S~Y VENDOR TOOL CODE START DEPTH STOP DEPTH BHC 9710.0 9601.0 PEX 9710.0 9601.0 HALS 9710.0 9601.0 $ LOG HEADER DATA DATE LOGGED: 2-SEP- 98 SOFTWARE VERSION: 8Cl-205 TIME CIRCULATION ENDED: 430 2-SEP-98 TIME LOGGER ON BOTTOM: 2200 2-SEP-98 TD DRILLER (FT) : 11666.0 TD LOGGER (FT) : 11032.0 TOP LOG INTERVAL (FT) : 9710.0 BOTTOM LOG INTERVAL (FT) : 10965.0 LOGGING SPEED (FPHR): 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER BHC COMP. SONIC DTC-H AMS AUX. MEAS. SONDE AMS-A PEX PLATFORM EXPRESS HILTB-FTB $ LIS Ta~p~Verification Listing Schlumberger Alaska Computing Center PAGE: 27 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6.000 9702.0 9710.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OHMS) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : QUIKDRIL-N 8.80 56.0 8.9 185.0 0.120 0.116 O. 122 74.0 70.0 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.0 REMARKS: Depth is based on driller's pipe tally as per request of wellsite geologist Harry Haywood (these logs were not tied into any other logs as requested). Logs are 7 feet shallower than MWD logs. Logs are 2 feet shallower than BHC Sonic log of 14-Nov-86 on G-26 when comparing the Sag River. Down log data on sonic log only. Standoffs run on HALS and BHC Sonic. First run PEX-SONIC, Second run RFT. Horizontal well - tools run on drill pipe with TLC gear. Do~m log stopped at 11030' due to high compressional forces. 3 stand repeat run below bottom of window. Bottom of window used as casing depth on header. THIS FILE CONTAINS THE RAW MAIN PASS CASED HOLE PEX DATA ACQUIRED AT .5' SAMPLE RATE. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 18 -JAN-i~"' 14: 54 PAGE: 28 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 66 66 73 66 66 73 65 0 0 52 1 0.5 FT 19 1 2 3 4 5 6 7 8 68 9 65 11 66 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 * * SET TYPE ~ CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 6037491 O0 000 O0 0 9 1 1 4 68 0000000000 TENS PEX LB 6037491 O0 000 O0 0 9 1 1 4 68 0000000000 HTEN PBX LB 6037491 O0 000 O0 0 9 1 1 4 68 0000000000 GR PEX GAPI 6037491 O0 000 O0 0 9 1 1 4 68 0000000000 CNTC PEX CPS 6037491 O0 000 O0 0 9 1 1 4 68 0000000000 CFTC PEX CPS 6037491 O0 000 O0 0 9 1 1 4 68 0000000000 RCFT PEX CPS 6037491 O0 000 O0 0 9 1 1 4 68 0000000000 RCNT PEX CPS 6037491 O0 000 O0 0 9 1 1 4 68 0000000000 TNRA PEX 6037491 O0 000 O0 0 9 1 1 4 68 0000000000 RTNR PEX 6037491 O0 000 O0 0 9 1 1 4 68 0000000000 NPOR PEX PU 6037491 O0 000 O0 0 9 1 1 4 68 0000000000 NPHI PEX PU 6037491 O0 000 O0 0 9 1 1 4 68 0000000000 TNPH PEX PU 6037491 O0 000 O0 0 9 1 1 4 68 0000000000 ** DATA ** DEPT. 9710.000 TENS.PEX 1167.000 HTEN. PEX 960.984 GR.PEX CNTC. PEX 2559.996 CFTC. PEX 1068.232 RCFT. PEX 994.821 RCNT. PEX TNRA.PEX 2.442 RTNR.PEX 2.549 NPOR.PEX 24.972 NPHI.PEX TNPH. PEX 27.335 82.386 2600.990 28.136 LIS T~P~' Verification Listing Schlumberger Alaska Computing Center 18-JAN-1~9'- 2 4 : 54 PAGE: 29 DEPT. 9600.500 TENS.PEX CNTC. PEX 1233.544 CFTC.PEX TNRA.PEX 3.804 RTNR.PEX TNPH. PEX 48.518 1260. 000 HTEN. PEX 328. 608 RCFT. PEX 4. 637 NPOR. PEX 973.537 CR.PEX 259.362 RCNT. PEX 45.257 NPHI.PEX 83. 352 1106. 785 51.616 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE FILE HEADER FILE~BER 10 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 1 DEPTH INCREMENT: 0.1667 FILE SUPH~ARY VENDOR TOOL CODE START DEPTH STOP DEPTH BHC 9710.0 9601.0 PEX 9710.0 9601.0 HALS 9710.0 9601.0 $ LOG HEADER DATA DATE LOGGED: 2-SEP- 98 SOFI~gARE VERSION: 8Cl-205 TIME CIRCULATION ENDED: 430 2-SEP-98 TIME LOGGER ON BOTTOM: 2200 2-SEP-98 TD DRILLER (FT) : 11666.0 TD LOGGER (FT) : 11032.0 TOP LOG INTERVAL (FT): 9710.0 LIS Tap~ Verification Listing Schlumberger Alaska Computing Center 18-JAN-19'~' 14:54 PAGE: 30 BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : 10965.0 1800.0 TOOL STRING (TOP TOBOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SONDE PEX PLATFORM EXPRESS $ TOOL NUMBER DTC-H AMS-A HIL TB - FTB BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6. 000 9702.0 9710.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TE3IPERATURE (DEGF): RESISTIVITY (OHFk4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : QUIKDRIL-N 8.80 56.0 8.9 185.0 0.120 0.116 0.122 74.0 70.0 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.0 REMARKS: Depth is based on driller's pipe tally as per request of wellsite geologist Harry Harwood (these logs were not tied into any other logs as requested). Logs are 7 feet shallower than MWD logs. Logs are 2 feet shallower than BHC Sonic log of 14-Nov-86 on G-26 when comparing the Sag River. Down log data on sonic log only. Standoffs run on HALS and BHC Sonic. First run PEX-SONIC, Second run RFT. Horizontal well - tools run on drill pipe with TLC gear. Down log stopped at 11030' due to high compressional forces. 3 stand repeat run below bottom of window. Bottom of window used as casing depth on header. THIS FILE CONTAINS THE RAW MAIN PASS CASED HOLE LIS T~p~~ Verification Listing Schlumberger Alaska Computing Center 18-JAN-l~9~9 '14 : 54 PAGE: 31 PEX DATA ACQUIRED AT .1667' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 O. 166 9 65 FT ll 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER #LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 6037491 O0 000 O0 0 10 1 1 4 68 0000000000 HCNT PEX CPS 6037491 O0 000 O0 0 10 I 1 4 68 0000000000 HCFT PEX CPS 6037491 O0 000 O0 0 10 1 1 4 68 0000000000 HGR PEX GAPI 6037491 O0 000 O0 0 10 1 1 4 68 0000000000 RHFT PEX CPS 6037491 O0 000 O0 0 10 1 1 4 68 0000000000 RHNT PEX CPS 6037491 O0 000 O0 0 10 1 1 4 68 0000000000 HTNP PEX PU 6037491 O0 000 O0 0 10 1 1 4 68 0000000000 HNPO PEX PU 6037491 O0 000 O0 0 10 1 1 4 68 0000000000 ** DATA ** DEPT. 9710.000 HCNT. PEX 2560.721 HCFT. PEX 1067.814 HGR.PEX RHFT. PEX 953.554 RHNT. PEX 2635.016 HTNP. PEX 27.360 HNPO. PEX 84.856 24.570 LIS Tap~ Verification Listing Schlumberger Alaska Computing Center 18-JAN-199~ 14:54 PAGE: 32 DEPT. 9600. 834 HCNT. PEX RHFT. PEX 259. 843 RHNT . PEX 1169.854 HCFT.PEX 1150.900 HT1VP.PEX 295.368 HGR.PEX 51.850 HNPO. PEX 79.468 56.438 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .010 SERVICE · FLIC VERSION · O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE ~ LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .011 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 11 RAW CASED HOLE REPEAT PASSES Curves and log header data for each pass in separate files. PASS NTJMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUP~4ARY VENDOR TOOL CODE START DEPTH STOP DEPTH BHC 971 O. 0 9591 . 0 PEX 9710.0 9591.0 HALS 9710.0 9591.0 $ LOG HEADER DATA DATE LOGGED '. SOF~gARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : 2-SEP-98 8Cl-205 430 2-SEP-98 2200 2-SEP-98 11666.0 11032.0 9710~0 10965.0 1800.0 LIS TapS'verification Listing Schlumberger Alaska Computing Center PAGE: 33 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SONDE PEX PLATFORM EXPRESS $ TOOL NUMBER DTC-H HIL TB ~ FTB BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6.000 9702.0 9710.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHbff4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT) : MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): QUIKDRIL-N 8.80 56.0 8.9 185.0 0.120 0.116 0.122 74.0 70.0 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 0.5 REMARKS: Depth is based on driller's pipe tally as per request of wellsite geologist Harry Haywood (these logs were not tied into any other logs as requested). Logs are 7 feet shallower than MWD logs. Logs are 2 feet shallower than BHC Sonic log of 14-Nov-86 on G-26 when comparing the Sag River. Do~zn log data on sonic log only. Standoffs run on HALS and BHC Sonic. First run PEX-SONIC, Second run RFT. Horizontal well - tools run on drill pipe with TLC gear. Do~m log stopped a¢ 11030' due to high compressional forces. 3 stand repeat run below bottom of window. Bottom of window used as casing depth on header. THIS FILE CONTAINS THE RAW REPEAT PASS CASED HOLE PEX DATA ACQUIRED AT .5' SAMPLE RATE. $ LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: 34 LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 52 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 19 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 6037491 O0 000 O0 0 11 1 1 4 68 0000000000 TENS PEX LB 6037491 O0 000 O0 0 11 1 1 4 68 0000000000 HTEN PEX LB 6037491 O0 000 O0 0 11 1 1 4 68 0000000000 GR PEX GAPI 6037491 O0 000 O0 0 !1 1 1 4 68 0000000000 CNTC PEX CPS 6037491 O0 000 O0 0 11 1 1 4 68 0000000000 CFTC PEX CPS 6037491 O0 000 O0 0 11 1 1 4 68 0000000000 RCFT PEX CPS 6037491 O0 000 O0 0 11 1 1 4 68 0000000000 RCNT PEX CPS 6037491 O0 000 O0 0 11 1 1 4 68 0000000000 TNRA PEX 6037491 O0 000 O0 0 11 1 1 4 68 0000000000 RTNR PEX 6037491 O0 000 O0 0 11 1 1 4 68 0000000000 NPOR PEX PU 6037491 O0 000 O0 0 11 1 1 4 68 0000000000 NPHI PEX PU 6037491 O0 000 O0 0 11 1 1 4 68 0000000000 TNPH PEX PU 6037491 O0 000 O0 0 11 1 1 4 68 0000000000 ** DATA ** · LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-JAN-19~9~ '14: 54 PAGE: 35 DEPT. 9710.000 TENS.PEX CNTC.PEX 2553.360 CFTC. PEX TNRA.PEX 2.370 RTNR.PEX TNPH. PEX 26.310 DEPT. 9591.000 TENS.PEX CNTC.PEX 1228.425 CFTC. PEX TNRA.PEX 3.682 RT1VR.PEX TNPH. PEX 45.650 1356. 000 HTEN. PEX 1095. 564 RCFT. PEX 2. 492 NPOR.PEJ~ 1466.000 HTEN. PEX 343.737 RCFT. PEX 4.379 NPOR.PEX 938.158 GR.PEX 1023.199 RCNT. PEX 24.534 NPHI.PEX 995.921 GR.PEX 280.596 RCNT. PEX 45.149 NPHI.PEX 86.859 2552.886 27.050 86.766 1141.009 49.387 ** END OF DATA ** **** FILE T~ILER **** FILE NAME : EDIT .011 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 12 MW CASED HOLE REPEAT PASSES Curves and log header data for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.1667 FILE SU~4MARY VENDOR TOOL CODE START DEPTH STOP DEPTH BHC 9710.0 9591.0 PEX 9710.0 9591.0 HALS 9710.0 9591.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: 2-SEP-98 8Cl-205 LIS Tape Verification Listing Schlumberger Alaska Computing Center la -JAN-1 ~9~"14 : 54 PAGE: 3 6 TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : 430 2200 11666.0 11032.0 9710.0 10965.0 1800.0 2-SEP-98 2-SEP-98 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC COMP. SONIC AMS AUX. MEAS. SONDE PEX PLATFORM EXPRESS $ TOOL NUMBER DTC-H HILTB-FTB BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) 6.000 9702.0 9710.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OHN2~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : QUIKDRIL-N 8.80 56.0 8.9 185.0 O. 120 0.116 0.122 74.0 70.0 70.0 NEUTRON TOOL TOOL TYPE (EPITHER2VAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAI~ SANDSTONE 2.65 TOOL STANDOFF (IN): 0.5 REMARKS: Depth is based on driller's pipe tally as per request of wellsite geologist Harry Haywood (these logs were not tied into any other logs as requested). Logs are 7 feet shallower than MWD logs. Logs are 2 feet shallower than BHC Sonic log of 14-Nov-86 on G-26 when comparing the Sag River. Down log data on sonic log only. Standoffs run on HALS and BHC Sonic. First run PEX-SONIC, Second run RFT. Horizontal well - tools run on drill pipe with TLC gear. LIS Tape "Verification Listing Schlumberger Alaska Computing Center 18-JAN-19-gP~'14 : 54 PAGE: 37 Down log stopped at 11030' due to high compressional forces. 3 stand repeat run below bottom of window. Bottom of window used as casing depth on header. THIS FILE CONTAINS THE RAW REPEAT PASS CASED HOLE PEX DATA ACQUIRED AT .1667' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT ll 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE N73M~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 6037491 O0 000 O0 0 12 ! 1 4 68 0000000000 HCNT PEX CPS 6037491 O0 000 O0 0 12 1 1 4 68 0000000000 HCFT PEX CPS 6037491 O0 000 O0 0 12 i 1 4 68 0000000000 HGR PEX GAPI 6037491 O0 000 O0 0 12 1 1 4 68 0000000000 RHFT PEX CPS 6037491 O0 000 O0 0 12 1 1 4 68 0000000000 RHNT PEX CPS 6037491 O0 000 O0 0 12 1 1 4 68 0000000000 HTNP PEX PU 6037491 O0 000 O0 0 12 1 1 4 68 0000000000 HNPO PEX PU 6037491 O0 000 O0 0 12 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: 38 DEPT. 9710.000 HCNT. PEX RHFT. PEX 1043.673 RHNT. PEX DEPT. 9591.334 HCNT. PEX RHFT. PEX 243.270 R3{NT. PEX 2554.974 HCFT. PEX 2657.739 HTNP.PEX 1193.083 HCFT. PEX 1070.233 HTNP. PEX 1096.203 HGR.PEX 26.312 HNPO. PEX 322.271 HGR.PEX 47.695 HNPO. PEX 83.664 23.238 91.706 45.114 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .012 SERVICE · FLIC VERSION · O01CO1 DATE · 99/01/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE · 99/01/18 ORIGIN · FLIC TAPE NAME · 98646 CONTINUATION # : 1 PREVIOUS TAPE : CO~4ENT : BP EXPLORATION, G-26A, PRUDHOE BAY, API #50-029-21661-01 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 99/01/18 ORIGIN · FLIC REEL NAME : 98646 CONTINUATION # : PREVIOUS REEL : COM~4ENT : BP EXPLORATION, G-26A, PRUDHOE BAY, API #50-029-21661-01 Sperry-Sun Drilling Services LIS Scan Utility wed Jan 13 15:18:45 1999 Reel HeRder Service name ............. LISTPE Date ..................... 99/01/13 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ............. - .... STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 99/01/13 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: MWD RUN 2 AK-MW-80336 S. LAITILA D. REID G-26A 500292166101 BP EXPLORATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 13-JAN-99 MWD RUN 3 AK-MW-80336 T. MCGUIRE D. AKERM3kN MWD RUN 3 AK-MW-80336 T. MCGUIRE D. AKERMAN 12 liN 13E 2583 1974 74.60 73.10 36.70 RECEIVED JAN 2.0 1999' Alaska Oil & Gas Cons. Commission WELL CASING RECORD 1ST STRING 2ND STRING 3RD-.STRING PRODUCTION STRING REMARKS: OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.000 9.625 9658.0 7.000 9702.0 11666.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL ONLY AND IS NOT PRESENTED. 3. MWD RUN 2 IS DIRECTIONAL WITH SCINTILLATION TYPE GAMMA RAY (NGP). 4. MWD RUN 3 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) AND ELECTROMAGNETIC WAVE RESISTIVITY PPIASE-4 (EWR-4) . 5. A CHANGE FROM SCINTILLATION TYPE GAMMA RAY (NGP) TO DUAL GAMMA RAY (DGR) OCCURED AT 10638'MD, 9038'TVD. 6. A MEASUREMENT AFTER DRILLING (MAD) PASS WAS PERFORMED WHILE TRIPPING OUT OF THE HOLE AFTER MWD RUN 3. THIS DATA IS PRESENTED AS A TAIL TO THIS LOG. 7. DEPTH SHIFING/CORRECTION OF MWD DATA IS WAIVED AS PER THE E-MAIL MESSAGE FROM TRACY LOVE OF BP EXPLORATION (ALASKA), INC. ON 02 NOVEMBER, 1998. 8. THIS WELL REACHED A TOTAL DEPTH (TD) OF 11666'MD, 9023'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SGRD = SMOOTHED GAMMA RAY. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME SRAT = SMOOTHED TOOL SPEED WHEN NOT DRILLING. CURVES WITH THE EXTENSION "M" ARE MEASURED AFTER DRILLING (MAD). $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/01/13 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SIIMMARY PBU TOOL CODE GR ROP FET RPD RPM RPS RPX $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH 9650.0 9712 5 10610 5 10610 5 10610 5 10610 5 10610 5 BASELINE DEPTH 9650.0 9679 5 9684 5 9686 0 9687 0 9691 5 9720 0 9723 5 9724 5 9725 0 9728 5 9730 0 9733.5 9735.0 9737 5 9739 0 9742 0 9744 5 9745 5 9760 0 9762 0 9763 0 9764 5 9767 0 9770 5 9772 0 9773 5 9775 0 9785 0 9786 5 9799 5 9802 0 9805 0 9807 5 9809 5 9811 5 GR 9656 5 9686 0 9691 0 9692 5 9693 0 9698 5 9728 0 9730 5 9731 5 9732 5 9735 5 9737 5 9741 0 9743 0 9745 0 9746 5 9749 5 9751 5 9753 0 9767 5 9770 0 9770 5 9771 5 9774 5 9776 5 9779 0 9779 5 9780 5 9789 5 9791 5 9805 0 9808 0 9809 5 9813 0 9815 5 9817 0 STOP DEPTH 11622 0 11660 5 11629 5 11629 5 11629 5 11629 5 11629 5 EQUIVALENT UNSHIFTED DEPTH 9812 5 9818 5 9820 0 9822 0 9825 5 9827 0 9830 5 9844 0 9846 0 9851 5 9855 5 9857 5 9890 5 9895 0 9897 5 9899 5 9937 5 9954 5 9956 5 9958 5 9967 5 9971 5 9973 5 9984 0 9986 0 9989 0 9990 5 9992 5 9998 5 10004 0 10134 0 10135 5 10154 5 10156 0 10157 0 10158 5 10162 5 10168 0 10169 5 10173 5 10175 0 10177 0 10179 0 10180 0 10181 5 10228 0 10231 0 10232 0 10233 0 10235 0 10237 0 10238 5 10257 0 10258 5 10263 5 10266 5 10348.5 9818.0 9825 0 9825 5 9827 5 9830 5 9832 5 9836 5 9850 5 9852 0 9859 0 9862 5 9864 5 9898 0 9901 5 9904 5 9905 0 9943 5 9961 0 9962 5 9965 5 9975 0 9978 5 9980 9990 9991 9995 9996 9998 10004 10009 10140 10141 10159 10160 10162 10163 10167 10173 10174 10179 10181 10182 10185 10186 10187 10234 10237 10238 10239 10241 10243 10245 10263 10264 10268 10272 10357 10354.0 10356 5 10360 0 10370 0 10372 0 10375 0 10378 0 10381 0 10382 5 10386 5 10389 5 10390 5 10392 5 10396 5 10397 5 10400 0 10404 0 10412 0 10416 5 10421 5 10424 5 10427 5 10430 0 10432 0 10433 5 10435 0 10437 5 10445 0 10447.0 10451 0 10455 0 10458 0 10459 5 10464 0 10466 5 10477.5 10482 0 10484 0 10487 0 10490 0 10495 0 10496 5 10498 5 10515 0 10516 5 10518 5 10522 0 10529 0 10534 5 10566 5 10572 5 10576 5 10580 0 10582 5 10823 0 10832 0 10857 5 10361.0 10363 5 10366 5 10377 5 10379 5 10381 5 10384 5 10387 5 10391 0 10394 0 10396 5 10398 5 10400 0 10403 5 10406 5 10409 0 10411 5 10420 0 10423 5 10425 5 10427 5 10430 0 10432 5 10436 0 10437 5 10439 5 10441 5 10450 5 10454 5 10456 5 10461 0 10464 5 10466 0 10469 5 10471 5 10482.5 10487 0 10488 5 10491 5 10494 5 10500 5 10502 0 10505 0 10523 5 10524 5 10526 0 10529 5 10536 5 10541 5 10573 0 10578 0 10582 0 10585 0 10588 0 10827 5 10837 0 10862 5 10897 5 10923 10925 10929 10931 10951 11660 $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ REMARKS: 10904 5 10927 5 10928 5 10935 0 10936 5 10956 5 11666 0 BIT RUN NO MERGE TOP MERGE BASE 2 9720.0 10701.0 3 10701.0 11666.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 Name Min Max DEPT 9650 11660.5 ROP 3.7478 4911.33 GR 21.8907 598.278 RPX 4.6854 19.4103 RPS 5.7721 20.5659 RPM 5.7778 22.6036 RPD 6.319 24.7162 FET 0.5368 24.22 Mean Nsam 10655.2 4022 52 5852 3897 62 4535 3945 10 4707 2039 12 6223 2039 13 1719 2039 13 6278 2039 3.12151 2039 First Reading 9650 9712.5 9650 10610.5 10610.5 10610.5 10610.5 10610.5 Last Reading 11660.5 11660.5 11622 11629.5 11629.5 11629.5 11629.5 11629.5 First Reading For Entire File .......... 9650 Last Reading For Entire File ........... 11660.5 File Trailer Service name ............. STSLIB.00t Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/01/13 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/01/13 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE FET RPD RPM RPS RPX GR P~AT $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKS: START DEPTH STOP DEPTH 10443.0 11634.5 10443.0 11634.5 10443.0 11634.5 10443.0 11634.5 10443.0 11634.5 10443.0 11626.5 10486.0 11668.0 MAD RUN NO. MAD PASS NO. MERGE TOP 3 10701.0 MERGED MAD PASS. $ MERGE BASE 11666.0 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 DEPT RAT GR RPX RPS RPM RPD FET Name Service Order Units Size Nsam Rep FT 4 1 68 MAD FT/H 4 1 68 MAD API 4 1 68 MAD OHMM 4 1 68 MAD OHMM 4 1 68 MAD OHMM 4 1 68 MAD OHMM 4 1 68 MAD HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean DEPT 10443 11668 11055.5 RAT 14.2167 1996.88 336.384 GR 21.3593 131.149 67.0838 RPX 2.7417 24.2759 8.17955 RPS 4.2475 28.4944 10.2681 RPM 4.347 55.9078 11.5993 RPD 5.1567 25.3766 13.3464 FET 3.5817 81.3678 35.3798 Nsam 2451 2365 2368 2384 2384 2384 2384 2384 First Readin9 10443 10486 10443 10443 10443 10443 10443 10443 Last Reading 11668 11668 11626.5 11634.5 11634.5 11634.5 11634.5 11634.5 First Reading For Entire File .......... 10443 Last Reading For Entire File ........... 11668 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/01/13 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/01/13 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9656.5 ROP 9720.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10638.5 10701.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: 30-AUG-98 INSITE 3.2 / ISC 5.07 NGP 5.74, PCD 3.01e MEMORY 10701.0 9720.0 10701.0 23.1 90.2 TOOL NUMBER PCG 61 6.000 6.0 QUICKDRIL-N 8.60 56.0 9.0 28000 6.0 .000 .000 .000 .000 104.0 .6 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 API 4 1 68 4 2 ROP MWD 2 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9656.5 10701 10178.8 2090 9656.5 GR 21.8907 598.278 56.8228 1965 9656.5 ROP 3.7478 223.886 40.6802 1962 9720.5 Last Reading 10701 10638.5 10701 First Reading For Entire File .......... 9656.5 Last Reading For Entire File ........... 10701 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/01/13 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/01/13 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH FET RPD RPM RPS RPX GR ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 10616 0 10616 0 10616 0 10616 0 10616 0 10635 0 10700 0 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11635.0 11635.0 11635.0 11635.0 11635.0 11627.5 11666.0 01-SEP-98 INSITE 3.2 / ISC 5.07 NGP 5.74, PCD 3.01e MEMORY 11666.0 10701.0 11666.0 85.9 93.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P1064GR4 P1064GR4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 6.0 BOREHOLE CONDITIONS MUD TYPE: FK/D DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: QUICKDRIL-N 8.70 54.0 9.0 27500 5.8 .160 .080 .200 .100 141.7 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STA/~DOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .6 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 GR MWD 3 API 4 1 68 RPX MWD 3 OHMM 4 1 68 RPS MWD 3 OHMM 4 1 68 RPM MWD 3 OHMM 4 1 68 RPD MWD 3 OHMM 4 1 68 FET MWD 3 HOUR 4 1 68 ROP MWD 3 FT/H 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean Nsam DEPT 10616 11666 11141 2101 GR 36.0205 117.649 67.5654 1986 RPX 4.6854 19.4103 10.4717 2039 RPS 5.7721 20.5659 12.6215 2039 RPM 5.7778 22.6036 13.1697 2039 RPD 6.319 24.7162 13.625 2039 FET 0.5368 24.22 3.12134 2039 ROP 7.4603 4911.33 64.9808 1933 First Reading 10616 10635 10616 10616 10616 10616 10616 10700 Last Reading 11666 11627.5 11635 11635 11635 11635 11635 11666 First Reading For Entire File .......... 10616 Last Reading For Entire File ........... 11666 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/01/13 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/01/13 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 3 MAD PASS NUMBER: FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 10448.5 11640.0 RPD 10448.5 11640.0 RPM 10448.5 11640.0 RPS 10448.5 11640.0 RPX 10448.5 11640.0 GR 10448.5 11632.0 RAT 10490.5 11673.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMARAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE ~ CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: 01-SEP-98 INSITE 3.2 / ISC 5.07 NGP 5.74, PCD 3.01e MEMORY 11666.0 10701.0 11666.0 85.9 93.6 TOOL NUMBER P1064GR4 P1064GR4 6.000 6.0 QUICKDRIL-N MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 8.70 54.0 9.0 27500 5.8 .160 .080 .200 .100 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MAD 3 API 4 1 68 4 2 RPX MAD 3 OHMM 4 1 68 8 3 RPS MAD 3 OHMM 4 1 68 12 4 RPM MAD 3 OHMM 4 1 68 16 5 RPD MAD 3 OHMM 4 1 68 20 6 FET MAD 3 HOUR 4 1 68 24 7 RAT MAD 3 FT/H 4 1 68 28 8 141.7 Name Min Max Mean Nsam DEPT 10448.5 11673.5 11061 2451 GR 21.3593 131.149 67.1422 2368 RPX 2.7417 24.2759 8.18686 2384 RPS 4.2475 28.4944 10.2748 2384 RPM 4.347 55.9078 11.6011 2384 RPD 5.1567 25.3766 13.3434 2384 FET 3.5817 81.3678 35.3754 2384 RAT 14.2167 1996.88 336.121 2367 First Reading 10448 5 10448 5 10448 5 10448 5 10448 5 10448 5 10448 5 10490 5 Last Reading 11673.5 11632 11640 11640 11640 11640 11640 11673.5 First Reading For Entire File .......... 10448.5 Last Reading For Entire File ........... 11673.5 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/01/13 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 99/01/13 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 99/01/13 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Physical EOF End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility Tue Dec 08 13:35:39 1998 Reel Header Service name ............. LISTPE Date ..................... 98/12/08 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Tape Header Service name ............. LISTPE Date ..................... 98/12/08 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments · STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FNL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: MWD RUN 2 AK-MW-80336 S. LAITILA D. REID G-26A 500292166101 BP EXPLOtLATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 08-DEC-98 'MWD RUN 3 MWD RUN 3 AK-MW- 80336 AK-MW- 80336 T. MCGUIRE T. MCGUIRE D. AKERMAN D. AKERMAN 12 liN 13E 2583 1974 74.60 73.10 36.70 DEC 08 1998 Oil & G~s Cons. ~c~omge WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.000 9.625 9658.0 7.000 9702.0 11666.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL ONLY AND IS NOT PRESENTED. 3. MWD RUN 2 IS DIRECTIONAL WITH SCINTILLATION TYPE GAMMA RAY (NGP) . 4. MWD RUN 3 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR-4) . 5. A CHANGE FROM SCINTILLATION TYPE GAMMA RAY (NGP) TO DUAL GAMMA RAY (DGR) OCCURED AT 10638'MD, 9038'TVD. 6. A MEASUREMENT AFTER DRILLING (MAD) PASS WAS PERFORMED WHILE TRIPPING OUT OF THE HOLE AFTER MWD RUN 3. THIS DATA IS PRESENTED AS A TAIL TO THIS LOG. 7. DEPTH SHIFING/CORRECTION OF MWD DATA IS WAIVED AS PER THE E-MAIL MESSAGE FROM TRACY LOVE OF BP EXPLOP~ATION (ALASKA), INC. ON 02 NOVEMBER, 1998. 8. THIS WELL REACHED A TOTAL DEPTH (TD) OF 11666'MD, 9023'TVD. SROP = SMOOTHED P~ATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SGRD = SMOOTHED GAMMA RAY. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (M~EDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME SRAT = SMOOTHED TOOL SPEED WHEN NOT DRILLING. CURVES WITH THE EXTENSION "M" ARE MEASURED AFTER DRILLING (MAD). $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/08 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 9656 5 ROP 9720 5 FET 10616 0 RPD 10616 0 RPM 10616 0 RPS 10616 0 RPX 10616 0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) STOP DEPTH 11627.5 11666.0 11635.0 11635.0 11635.0 11635.0 11635.0 BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ REMARKS: EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 2 9720.0 10701.0 3 10701.0 11666.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD API 4 1 68 4 2 ROP MWD FT/H 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPD MWD OHMM 4 1 68 16 5 RPX MWD OHMM 4 1 68 20 6 RPM MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Min Max Mean Nsam DEPT 9656.5 11666 10661.2 4020 GR 21.8907 598.278 62.2626 3943 ROP 3.7478 4911.33 52.7262 3892 RPS 5.7721 20.5659 12.6215 2039 RPD 6.319 24.7162 13.625 2039 RPX 4.6854 19.4103 10.4717 2039 RPM 5.7778 22.6036 13.1697 2039 FET 0.5368 24.22 3.12134 2039 Reading 9656.5 9656.5 9720.5 10616 10616 10616 10616 10616 Reading 11666 11627.5 11666 11635 11635 11635 11635 11635 First Reading For Entire File .......... 9656.5 Last Reading For Entire File ........... 11666 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/08 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER _ FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE FET RPD RPM RPS RPX GR P~AT $ MERGED DATA SOURCE PBU TOOL CODE START DEPTH 10448 5 10448 5 10448 5 10448 5 10448 5 10448 5 10490 5 STOP DEPTH 11640 0 11640 0 11640 0 11640 0 11640 0 11632 0 11673.5 MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE MWD $ REMARKS: MERGED MAD PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 10701.0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 RAT MAD FT/H 4 1 68 GR MAD API 4 1 68 RPX MAD OHMM 4 1 68 RPS MAD OHMM 4 1 68 RPM MAD OHMM 4 1 68 RPD MAD OHMM 4 1 68 FET MAD HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 11666.0 Name Min Max Mean Nsam DEPT 10448.5 11673.5 11061 2451 RAT 14.2167 1996.88 336.121 2367 GR 21.3593 131.149 67.1422 2368 RPX 2.7417 24.2759 8.18686 2384 RPS 4.2475 28.4944 10.2748 2384 RPM 4.347 55.9078 11.6011 2384 RPD 5.1567 25.3766 13.3434 2384 FET 3.5817 81.3678 35.3754 2384 First Reading 10448.5 10490.5 10448.5 10448.5 10448.5 10448.5 10448.5 10448.5 Last Reading 11673.5 11673.5 11632 11640 11640 11640 1]_640 11640 First Reading For Entire File .......... 10448.5 Last Reading For Entire File ........... 11673.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/08 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9656.5 ROP 9720.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: Mu~XIMUM ANGLE: STOP DEPTH 10638.5 10701.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ~ NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 30-AUG-98 INSITE 3.2 / ISC 5.07 NGP 5.74, PCD 3.01e MEMORY 10701.0 9720.0 10701.0 23.1 90.2 TOOL NUMBER PCG 61 6.000 6.0 QUICKDRIL-N 8.60 56.0 9.0 28000 6.0 .000 MUD AT MAX CIRCULATING TERMPER3LTURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .000 .000 .000 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 API 4 1 68 4 2 ROP MWD 2 FT/H 4 1 68 8 3 104.0 First Name Min Max Mean Nsam Reading DEPT 9656.5 10701 10178.8 2090 9656.5 GR 21.8907 598.278 56.8228 1965 9656.5 ROP 3.7478 223.886 40.6802 1962 9720.5 Last Reading 10701 10638.5 10_701 First Reading For Entire File .......... 9656.5 Last Reading For Entire File ........... 10701 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/08 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 R_AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH FET 10616.0 RPD 10616.0 RPM 10616.0 RPS 10616.0 RPX 10616.0 GR 10635.0 ROP 10700.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11635 0 11635 0 11635 0 11635 0 11635 0 11627 5 11666 0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA P~AY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : 01-SEP-98 INSITE 3.2 / ISC 5.07 NGP 5.74, PCD 3.01e MEMORY 11666.0 10701.0 11666.0 85.9 93.6 TOOL NUMBER P1064GR4 P1064GR4 6.000 6.0 QUICKDRIL-N 8.70 54.0 MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 9.0 27500 5.8 .160 .080 .200 .100 .6 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 GR MWD 3 API 4 1 68 RPX MWD 3 OHMM 4 1 68 RPS MWD 3 OHMM 4 1 68 RPM MWD 3 OHMM 4 1 68 RPD MWD 3 OHMM 4 1 68 FET MWD 3 HOUR 4 1 68 ROP MWD 3 FT/H 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 141.7 Name Min Max Mean DEPT 10616 11666 11141 GR 36.0205 117.649 67.5654 RPX 4.6854 19.4103 10.4717 RPS 5.7721 20.5659 12.6215 RPM 5.7778 22.6036 13.1697 RPD 6.319 24.7162 13.625 FET 0.5368 24.22 3.12134 ROP 7.4603 4911.33 64.9808 Ns am 2101 1986 2039 2039 2039 2039 2039 1933 First Reading 10616 10635 10616 10616 10616 10616 10616 10700 Last Reading 11666 11627.5 11635 11635 11635 11635 11635 11666 First Reading For Entire File .......... 10616 Last Reading For Entire File ........... 11666 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/08 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 3 NLAD PASS N-UMBER: FILE SUMMARY VENDOR TOOL CODE START DEPTH FET RPD RPM RPS GR RAT RPX $ LOG HEADER DATA DATE LOGGED: SOFTWARE 10448.5 10448 5 10448 5 10448 5 10448 5 10490 5 19448 5 SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: STOP DEPTH 11640.0 11640.0 11640.0 11640.0 ~11632.0 11673.5 11640.0 01-SEP-98 INSITE 3.2 / ISC 5.07 NGP 5.74, PCD 3.01e MEMORY 11666.0 10701.0 11666.0 85.9 M/kXIMLD4 A/qGLE: 93.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE A/qD CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 TOOL NUMBER P1064GR4 P1064GR4 6.000 6.0 QUICKDRIL-N 8.70 54.0 9.0 27500 5.8 .160 .080 .200 .100 141.7 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MAD 3 API 4 1 68 4 2 RPX MAD 3 OHMM 4 1 68 8 3 RPS MAD 3 OHMM 4 1 68 12 4 RPM MAD 3 OHMM 4 1 68 16 5 RPD MAD 3 OHMM 4 1 68 20 6 FET MAD 3 HOUR 4 1 68 24 7 RAT MAD 3 FT/H 4 1 68 28 8 Name Min Max Mean Nsam DEPT 10448.5 11673.5 11061 2451 GR 21.3593 131.149 67.1422 2368 RPX 2.7417 24.2759 8.18686 2384 RPS 4.2475 28.4944 10.2748 2384 RPM 4.347 55.9078 11.6011 2384 RPD 5.1567 25.3766 13.3434 2384 FET 3.5817 81.3678 35.3754 2384 P~AT 14.2167 1996.88 336.121 2367 First Last Reading Reading 10448.5 11673.5 10448.5 11632 10448.5 11640 10448.5 11640 10448.5 11640 10448.5 11640 10448.5 11640 10490.5 11673.5 First Reading For Entire File .......... 10448.5 Last Reading For Entire File ........... 11673.5 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/12/08 Origin ................... STS Tape Name ................ UNKI~OWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 98/12/08 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Physical EOF End Of LIS File